Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-061CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Not Operable - MPS-26 (PTD# 2030610) - Failed MIT-IA Date:Wednesday, December 4, 2024 3:23:11 PM From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Wednesday, December 4, 2024 3:20 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: Not Operable - MPS-26 (PTD# 2030610) - Failed MIT-IA Mr. Wallace, On 12/2/24, PWI well MPS-26 (PTD# 2030610) had the IA pressure bled to 100 psi, the IA pressure returned to ~800 psi within a few hours, closely matching tubing injection pressure. On 12/4/24 we performed a failing MIT-IA to 1500 psi. The well has been re-classified as Not Operable. The well has been shut in and freeze protected and will remain offline until well barriers are restored. Please respond with any questions. Thank You, Ryan Thompson Milne / Islands / WNS Well Integrity Engineer 907-564-5005 From: Ryan Thompson Sent: Monday, December 2, 2024 4:08 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: Under Evaluation - MPS-26 (PTD# 2030610) - IA Pressure Increase Mr. Wallace, On 12/1/24, PWI well MPS-26 (PTD# 2030610) had an IA pressure increase from 450 to 800 psi with stable injection rates & pressures, wellhead pressures on this dual string injector are at ~830 & 840 psi. The well is now classified as Under Evaluation to determine the cause of the IA pressure increase. On 12/2/24 the well passed a PPPOT-T. Plan forward: 1. Bleed the IA pressure to re-establish tubing to IA differential, monitor for re- pressurization. 2. If re-pressurization is observed, perform MIT-IA. Attached is a WBS & 30 day TIO plot. Please respond with any questions or concerns, Thank You, Ryan Thompson Milne / Islands / WNS Well Integrity Engineer 907-564-5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Under Evaluation - MPS-26 (PTD# 2030610) - IA Pressure Increase Date:Monday, December 2, 2024 4:41:32 PM Attachments:MPS-26.pdf MPS-26 TIO.docx From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Monday, December 2, 2024 4:08 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: Under Evaluation - MPS-26 (PTD# 2030610) - IA Pressure Increase Mr. Wallace, On 12/1/24, PWI well MPS-26 (PTD# 2030610) had an IA pressure increase from 450 to 800 psi with stable injection rates & pressures, wellhead pressures on this dual string injector are at ~830 & 840 psi. The well is now classified as Under Evaluation to determine the cause of the IA pressure increase. On 12/2/24 the well passed a PPPOT-T. Plan forward: 1. Bleed the IA pressure to re-establish tubing to IA differential, monitor for re- pressurization. 2. If re-pressurization is observed, perform MIT-IA. Attached is a WBS & 30 day TIO plot. Please respond with any questions or concerns, Thank You, Ryan Thompson Milne / Islands / WNS Well Integrity Engineer 907-564-5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Size Spf Interval (TVD) KOP @ 300‘ Hole angle thru perfs = 54 DEG. Max. hole angle = 55 deg @ 3940‘ DATE REV. BY COMMENTS MILNE POINT UNIT WELL No.: S-26i API : 50-029-23150-00 BP EXPLORATION (AK) Orig. KB Elev. = 73.20 Orig. GL Elev. = 38.40 Perforation Summary MPU S-26iTree: Wellhead: 05/19/02 Drilled by Cased Doyon 141 20" x 34“ insulated, 215 #/ft A-53 112‘ 7“ Halliburton Float Collar PBTD 7“ Halliburton float shoe 7“ 26#, L-80, BTRC Casing (drift id = 6.151, cap.= .0383 bpf) Short String 2-3/8“ HES X-Nipple (1.875” pkg. bore) 2-3/8“ HES X-Nipple (1.875” pkg. bore) 2-3/8“ HES XN-Nipple (1.875” pkg. bore) No-Go 1.791” Long String 1.75“ ball. 7“ x 2-3/8” Baker “GT” Ret. dual pkr. 7“ x 2-3/8” Baker “FH” Ret. pkr. OA sands OB sands 2-3/8“, 4.7 #/ft L-80, IBT tubing (drift id = 1.901, cap.=.00387 bpf) MDO 2-3/8“ HES X-Nipple (1.875” pkg. bore) 2-3/8“ HES X-Nipple (1.875” pkg. bore) 2-3/8“ HES XN-Nipple (1.875” pkg. bore) No-Go 1.791”3 3/8“ 3 3/8“ 6 6 6 . 1.945“ ID. 2.41“ ID. ELMD CIW 2 1/16“ 5M Dual string 11“ x 2 3/8” 5M FMC dual string Hanger thread 2 3/8“ EUE top and IBT bottom 2” CIW-H BPV profile Tubing tail / WLEG XN x XN x x x 06/11/03 MDO Completion Rig Doyon 14 2-3/8“ Baker ‘E’ Hydro Trip Sub (2.00” pkg. bore) Guns : HSD, 3406PJ, HMX, 60 deg. phase WLEG 9-5/8“ 40 #/ft, L-80 BTC 5654‘ - 5674’ 4109‘ - 4,120’ 5684‘ - 5694’ 4,126‘ - 4132’ 5730‘ - 5760’ 4,153‘ -4171’ 2,934‘ 5,943‘ 5,859‘ 5,721‘ 5,716‘ 5,712‘ 5,700‘ 5,620‘ 5,577‘ 2,980‘2,981‘ 5,578‘ 5,620‘ 5,636‘ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, September 15, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC S-26 MILNE PT UNIT S-26 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2023 S-26 50-029-23150-00-00 203-061-0 W SPT 4089 2030610 1500 690 692 692 692 54 78 80 79 4YRTST P Austin McLeod 7/29/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT S-26 Inspection Date: Tubing OA Packer Depth 122 1723 1640 1623IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM230729182151 BBL Pumped:1.2 BBL Returned:1.1 Friday, September 15, 2023 Page 1 of 1           MEMORANDUM State of Alaska Alaska Oil and Cas Conservation Commission DATE: Wednesday, July 10, 2019 TO: Jim Regg %/1(I 9 P.1. Supervisor 1� SUBJECT: Mechanical Integrity Tests 111 _` Hilcorp Alaska LLC 5-26 FROM: Matt Herrera MILNE PT UNIT 5-26 Petroleum Inspector Sre: Inspector Well Name MILNE PT UNIT S-26 Insp Num: mitMFH190701172057 Rel Insp Num: NON -CONFIDENTIAL Reviewed By: P.I. Supry : i& Comm API Well Number 50-029-23150-00-00 Inspector Name: Matt Herrera Permit Number: 203-061-0 Inspection Date: 7/1/2019 ✓ Wednesday, July 10, 2019 Page I of I Packer Depth Pretest Initial I5 Min 30 Min 45 Min 60 Min s-z6 Type In' YP J w TVD �g 4os9 Tubin 9si I esn 978 - 9za �PTED;030610 � SPT Test SI p 1500 IA 665 GJ' 1686 16nped:4 - eYpe BBL BBL Pumped: Ret Uruetl: 0.7 OA 136 00 r 201 -- 192 Interval P/F P ✓ _ Notes: This well has a two tubing string completion, this report reflects results for the Long String. IA Pressure tested to 1700 PSI per Operator. Short String TBG pressures. Pre/ 5 , Initial 450, 15 min/450, 30 min/450 ✓ Wednesday, July 10, 2019 Page I of I • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission 913/1s- DATE: Thursday,September 03,2015 TO: Jim Regg 1 P.I.Supervisor SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC S-26 FROM: Jeff Jones (�� 't; MILNE PT UNIT SB S-26 Petroleum Inspector d,�+,IMED ,J�=>> k.: t-:µ"J Src: Inspector Reviewed By: P.I.Suprv.)13g NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB S-26 API Well Number 50-029-23150-00-00 Inspector Name: Jeff Jones Permit Number: 203-061-0 Inspection Date: 7/3/2015 Insp Num: mit2J150706103814 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well S-26 - Type Inj W -TVD 4089 Tubing 800 800 . 800 - 800 • I PTD 2030610 ' Type Test SPT Test psi 1500 - IA 116 1803 • 1752 - 1751 IntervalF4YRTST PAFP OA 100 200 - 200 200 ------ ----- Notes: 1 well inspected. Thursday,September 03,2015 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday,July 20,2015 TO: Jim Regg jg �/I / P.I.Supervisor 1.- 0-1g � fS SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC S-26 FROM: Jeff Jones MILNE PT UNIT SB S-26 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry Jgg-- NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB S-26 API Well Number 50-029-23150-00-00 Inspector Name: Jeff Jones Permit Number: 203-061-0 Inspection Date: 7/6/2015 Insp Num: mitJJ150706103814 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min 15-26 - W - ' 4089 j Tubin 800 - I 800 = 800 800 -T Well IType in! TVD g PTD 2030610 ' 1Type Test SPT Test psi; 1500 - IA iib . - Bo . 1752 -� 1751 t— 200 - Intervall4YRTST P/F P ✓ OA 100 200 - 1 200 - — I Notes: I well inspected SCOW) ,''\' , 1 tl Monday,July 20,2015 Page 1 of 1 · - Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 0"3 - 0 01 Well History File Identifier Organizing (done) ~wo-sided 11111111111 ""1111 ~escan Needed ""111111111111111 RE~AN 'Ç'C0lor Items: o Greyscale Items: DIGITAL DATA ~iskettes, No. '3 o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: o Other: OVERSIZED (Non-Scannable) o Logs of various kinds: NOTES: Date: ~ I :J.Ò} OS I I o Other:: BY: ~ 151 n1E- 11111111111111" III me Project Proofing Date: <¿ /:J-3/ O~5" , I () 0 + ~ I = TOTAL PAGES~ (Count does not include cover t) 151 151 BY: ~ Scanning Preparation BY: Production Scanning Stage 1 Page Count from Scanned File: j 1 ~ (Count does include cover sheet) Page Count Matches Number in Scanning Pr~paration: LÄES BY: ~ Date: ß/~3/05 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES 11111111111111 "III NO 151 V\1P NO BY: Maria Date: 151 11111111111111 ,,1/1 Scanning is complete at this point unless rescanning is required. ReScanned 11111111111111" III BY: Maria Date: 151 Comments about this file: Quality Checked "' 111111111111111I 1 0/6/2005 Well History File Cover Page.doc LH- 333 West Seventh Avenue C OVERNOR SEAN PARNELI, Anchorace, Alaska 99501 3572 Moro 90/ 279 1433 Alecia Wood Production Engineer 03 Q 1O BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Field, Schrader Bluff Oil Pool, SBL MPS-26 Sundry Number: 314-174 Dear Ms. Wood: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 2dday of March, 2014. Encl. • C V A EIC, 3.:',.l''',i .='''' D STATE OF ALASKA • M_ R 1 8 2, : ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS ACC 20 AAC 25.280 1.Type of Request: Abandon❑ Plug for Redrill❑ Perforate New Pool❑ Repair Well❑ Change Approved Program❑ Suspend❑ Plug Perforations❑ Perforate❑ Pull Tubing❑ Time Extension❑ Operations Shutdown❑ Re-enter Susp.Well❑ Stimulate 0. , Alter Casing❑ Other: ❑ 2.Operator Name: 4.Current Well Class: G'&wr/'/,'W''k 5.Permit to Drill Number. BP Exploration(Alaska),Inc. Exploratory ❑ Developrne'nt ❑ 203-061-0 ' 3.Address: Strati ra hic Service 6.API Number.- 9 P ❑ ❑ • So-019-a3I 0-00-00 P.O.Box 196612,Anchorage,AK 99519-6612 -50429-23.151:1-8140-- ,n 7.If perforating: 8.Well Name and Number. ?At' What Regulation or Conservation Order governs well spacing in this pool? . SBL MPS-269S- Will planned perforations require a spacing exception? Yes ❑ No ❑ 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0380109. MILNE POINT, SCHRADER BLFF OIL' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 5944 - 4280 5700 4136 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"91.5#H-40 35-115 35-115 Surface 2899 9-5/8"40#L-80 35-2934 35-2529.31 5750 3090 Intermediate None None None None None None Production 5910 7"26#L-80 33-5943 33-4279.64 7240 5410 Liner None None None None None None Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment, See Attachment 2-3/8"4.6#L-80 L-80 30-5636 Packers and SSSV Type: 2-3/8"Baker GT Dual Packer Packers and SSSV MD(ft)and ND(ft): 5620,4089.37 r 5-700 0413 No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal ❑ 13.Well Class after proposed work: Detailed Operations Program E. BOP Sketch ❑ Exploratory ❑ Development ❑ Service E- 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ ' GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Alecia Wood Email Alecia.WoodcBP.Com _ Printed Name Alecia Wood Title Production Engineer Signaturedk_ci Phone 564-5492 ate Prepared by Gany Catron 564-4424 f a-t00 Or( IIS 2/11 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. —6`14,-`I Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: RBDM MAY 10 2014 Spacing Exception Required? Yes ❑ No Subsequent Form Required: p--4.44, 4 /' ' APPROVED BY Approved by: `„ ✓-' COMMISSIONER THE COMMISSION Date: 3(2c)l C (VRriepilNoA egb 3/I S/l ,� 1i Form 10-403 Revised 10/2012 O a lid for 12 months from the date of p3""prbval. m t Form and Attachments in Duplicate VLF 3//9/) 4- Perforation Attachment ADL0380109 Well Date _ Perf Code MD Top MD Base TVD Top TVD Base MPS-26SS 6/11/03 PER 5654 _ 5674 4109 4121 MPS-26SS 6/11/03 PER 5684 5694 4127 4133 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK,CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF by 0 To: Mark O'Malley/Rob Handy Date: March 18, 2014 MPU Ops Team Leaders From: Alecia Wood, MPU Schrader Pad Engineer 907-564-5492 Subject: MPS-26SS Acid Sundry Post MBE Treatment Step Unit Operation 1 C Conduct coil cleanout of short string 2 C Acid contingence to regain injectivity OBJECTIVE Cleanout wellbore with coil tubing post (acid soluble) class G cement MBE treatment. Acidize as necessary to regain injectivity • Background MPS-26 is a dual completed injector with two strings of 2-3/8" tubing in the Schrader Bluff. This injector was completed in June 2003 to support MPS-23 and MPS-25. The watercut in offset producer MPS-23 began to increase early 2009, and an MBE was confirmed with a positive red dye test on 4/11/09 in the OA. A Marcit gel treatment was pumped in August 2009 with no apparent success, and Thermatek cement and H2Zero polymer job was pumped in August 2011 that was successful in remediating the MBE. To date there have been 6 positive Red dye tests in the OA, the most recent of which on 05/06/13 confirming that the last MBE treatment pumped in August 2011 has broken down. S-26SS exhibited zero injectivity after an acid soluble cement was pumped to treat the MBE to MPS-23. A CT FCO is required to regain injectivity into the wellbore. Due to the completion, it is likely that the CT will hit the long string before cleaning out the perforation interval in the short string and acid will be required. PROCEDURE Cleanout 1. RU, hold pre-job safety meeting, PT 2. RIH and cleanout wellbore with coil tubing to bottom perf (5694'MD) taking care not to damage the long string. 3. Perform injectivity test with KCL or PW Contingency if injectivity is not regained 4. Place up to 30bbls of HCL across perfs in stages, allow to soak then circulate out or flush to formation using 50bbls of PW or KCL if injectivity has been established. 5. Perform injectivity test with KCL or PW raising injection pressure to a max of 4000psi if necessary to regain injectivity. • • Ciw Tree: ad:2 v1 s"SM Dual string MPU P U S-2 6 i Brig.KB Elev.=7320 iMe161e3d:11'x 2 3i8"SM FMC dual string 'Y, V 3/8"EVE top and IBT T -GL Elev.= 38A0 Or' Hanger thread 2bottom � 2"CIW-H BPV profile 20"x 34"insulated,215 VI A-53 112' 9-5/8'40#ilt,L-80 BTC 2.934' Short String I Long String 2,981' 2-3/8"HES X-Nipple(1.875'pkg.bore; I I 2-3/8'HES X-N le(1.875"pkg.bore! 2,980' KOP t_. ri3l�' Max. hole angle=55 deg 4.3940' Hole angle thru pert =54 DEG. 7"26#,L-80,BTRC Casing (drill 1=6.151,cap.=.0383 bps') 2-3/8%4.7 tilt L-80,IBT tubing (drift id=1.901,cab.=5.103&7 bp() 5,578' 2-3/8'HES X-N fipple(1.875"pkg.bore ' n 2-308'HES x-Nipple(1.875'pkg.bore; 5,577' 7'x:2-3/8"Baker"GT'Ret.duat pkr. 5.620' • 1.945'ID, 5,620' 2-308'HES XN-t4ppte(1 875'pkg.bore) No-Go 1.791" 5,636' Tubing taut+WLEG Perforation Summary 7'x 2-318"Baker"FH"Ret pkr 5 7X Size SO Interval (TVD) OA sands 2-308"HES XN- are tipple(1.875"pkg.b ) 5,712 3 3/8" 6 5654'-5674' 41019'-4,120' No-Go 1.751" 6 5684'-5694' 4,12V-4132' _ 2-3/8"Baker'E'Hydro Trip Sub 5,716' OB sands _ (.2.00'pkg.bore) 33/8" 6573,-5760' 4,153'417• J4LEG 5,721' ELMO Guns:HSD.3406PJ.HNIX,60 deg.ptta5e 5,859' 7'Halliburton Float Collar PBTD :D 1 75'ball. 5,943' 7'Halliburton float shoe 1 k DATE REV.BY COMMENTS 05/19/02 MDU Drilled by Cased Doyon 141 MW L POINT UNIT WELL No.: 5-261 06/11/03 MDO Completion Rig Doyon 14 API: 50-029-23150-00 BP EXPLORATION (AK) RECEIVED ' � STATE OF ALASKA A OIL AND GAS CONSERVATION COMM.ON OCT 1 4 2 01 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well Plug Perforations U Perforate U OtherU MBE Treatment Performed: Alter Casing ❑ Pull Tubing ] Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development❑ Exploratory ❑ 203-061-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service El 6.API Number: Anchorage,AK 99519-6612 50-029-23150-80-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0380109 SBL MPS-26LS 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): MILNE POINT,SCHRADER BLFF OIL 11.Present Well Condition Summary: Total Depth measured 5944 feet Plugs measured None feet true vertical 4280.24 feet Junk measured None feet Effective Depth measured 5859 feet Packer measured See Attachment feet true vertical 4229.88 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 76 20"X 34"215.5#A53 36-112 36-112 Surface 2899 9-5/8"40#L-80 35-2934 35-2529.31 5750 3090 Intermediate None None None None None None Production 5910 7"26#L-80 33-5943 33-4279.64 7240 5410 Liner None None None None None None feet , Perforation depth True Measured depth Vertical depth 4153.75- 416701.4 feet CANNED '` 0 { 13 ZO Tubing(size,grade,measured and true vertical depth) 2-3/8"4.6#L-80 30-5721 30-4148.47 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 5730'-5760' Treatment descriptions including volumes used and final pressure: 5 Bbls 100 ppt HEC,442 psi;15 Bbls Class G Cement, 1030 psi;407 Bbls OrganaSeal Polymer, 1225 psi 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 599 736 Subsequent to operation: 219 838 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development❑ Service 0 Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas U WDSPI.0 GSTOR ❑ WINJ Q WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 313-288 Contact Garry Catron Email Garry.Catron( BP.Com Printed Name Garry Catron Title PDC PE Signature __ C A Phone 564-4424 Date 10/14/2013 V1/ r /e2rz RBDMS OCT 171 lo/77- Form 10-404 Revised 10/2012 Submit Original Only . • • Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS-26LS PACKER 5620 _ 4016.17 2-3/8" Baker GT Dual Packer MPS-26LS PACKER 5700 4062.95 7 X 2.375 Baker FH Ret Packer • 0 � c 0_ a) ai rn (T) ai O a)a� O Cl) -C C ° ,t 7 } 70 ° -1- a) c a) - _i- a)*° c o E U v a) N o ° Q Y rnEN rna) a- o ° D E ° * Y Q o a • c � U pc a) O ° .0 U d O a)) p)o O � (/)i ' UJ � N N Q L L O_ NU E -a O , DU L 0 �o c O _c c E O UD Q+., U - O to -O a) o S) Y C N c 00 N cn N CD o (0 O fA L.0 y � (D Q) U N S?Q U ,� U Q) V �' O)N (D .O _N LI_ O• U) t[) s_ 0 O , * U) (D N ZT ° U a) Q N C * ° -. = -° Lo a) d °. 0- U) C cu N co°v iii U) ' v iri a a) �- a) Y !� Q o E °° U o N ) C SZ ) O * p- 3 LL Qo ai '- oo .° i- Cl) � (tiw �° W E o -c E O• m a) a) c Cl) a) C _O tZ to 0 (0 0_ 3 Qi (0 2 c • -° _ a) 2U s) .Q a) ? O 't -' N > .«' °� J > co OE = wS OEooa) c>� o cJ U CCD� 'u) a) .0 a) p 2 .0 O cn •- Q-> a L o a) U Q Y a) E �c °-= O V U) Q 6 O V -0 — a. a) E Y o N 0 ° * °o n ._ °-w. Q 0 ° c (0 °..- 0 0 o cD °r) O it . - U) (n � o a) . cq N < 0)i • . - _a `DN � `t - � ° a) -c � "NOU) C < C > • J "° o CD o to a) Co O sZN 0 N sZ� i N a) E -- N a) O ~ ° m N a) cn to 0 n C) p -7 E O. E to a) 2 E _o O O U) p ° O� ° ° U) p Q▪ w w a) ° a cD J a ° U) a o O Q) +' II 2 f0 1) Ws c (D O -Q = O c Q N m \ p N +- O w O cD E U) E Lo sz E O E to v o_ E O O u) (%) CD CD 13 U) aC) _1 — e- a) (0 O) 0— .E `- (n o w * .E r- 0 w a) OC) a. E w Q a) 0- E0•CO .Q `- � ° E U � E � sz E U °o c - a o 2 a) co _a to 2 a>„ co)II- 0 > � 3 C LL E _ ,° .8 c E =Ili -0 t- E cam' ° (D � M tD � E C * o O ...j UMW m a. 3 v >> 1E a. 3 -- E O O a) 23 4k 0) 0)C0 �a .*x NN t 0 'c ate) -) a) C C ° '2 o C C °-o co E 3 (Dto c) O u°i C - cn O Q E E ° a) E E ° i� o o . ° a`) ate) c ° a) ° U) 0 0U U O ca L ° U U p U o Ci) E sZ J = o_ °-J _ C A Inc 3 � m0 � : j ▪ n ° a) a �o- O co �� co a�i to O o O (n «- .� CI 92 O -a ° 3 ca (0Oz :z a�i 3 cD ,n rn m 0_° 3 cc\i -0 a) 3 N c a) .0 a) «' U J G C +-' U J E C !Z O II +' to t� �' '' U) N ° O o E ° CD °)U O ° > a) t�U (D O Q> •> r = O _ v a) °- O 15 O LO 0 o f °-Y E °-Y tTU) E E -0 O� > a) ° a) Nt . t, > 3 .� C VLL ca▪ 1.0 N a)_cp O "a ° (A ` N c 3 C ` N (D c, ° c O ` t Y N `_ L + c O C CD (O co F- r 9— (D O F- r- 4 > O U O� I. o C a) L '_ ti ' (nwa) ° °) ) Ewa) ° ° ,- -oE ° aO wa) � ( ° wa) II (/) iQ m25 CO OmT N p) O a) 0Om (fl m EN — U) m EX OJ a) _a > 2 ° 7 > v .t g ° � — w 3t II 'n to > .W •c to 2 >, .cn II": tD � U) U) N > (0 _ U) N N .0 (/) QF- O .° : Q_a 2 °. * a__a F- N 3 co co co co „-co- ,-- r N O O O ON ON N N N N N U N N Cr) r r co O O O 2,3 c Tree: CIW 2 6"h ad:11 1x 2 358"M FM I string M P U S_26 Orig. KB Elev. =73.20 Wel + Hanger thread 2 3/8"EUE top and IBT bottom 1 Orig. GL Elev. = 38.40 2"CIW-H BPV profile 20"x 34"insulated,215#/ft A-53 112' 9-5/8"40#/ft,L-80 BTC 2,934' I Short String Long String y 2,981' 2-3/8"HES X-Nipple(1.875"pkg.bore) V 2-3/8"HES X-Nipple(1.875"pkg.bore) 2,980' KOP @ 300' Max. hole angle =55 deg @ 3940' Hole angle thru perfs=54 DEG. 7"26#,L-80,BTRC Casing (drift id=6.151,cap.=.0383 bpf) 2-3/8",4.7#/ft L-80,IBT tubing (drift id=1.901,cap.=.00387 bpf) '' 2-3/8"HES X-Nipple(1.875"pkg.bore) 5,577' 5,578' 2-3/8"HES X-Nipple(1.875"pkg.bore) 7"x 2-3/8"Baker"GT"Ret.dual pkr. 5,620' ao rrm� n 1.945"ID. 5,620' 2-3/8"HES XN-Nipple(1.875"pkg.bore) xN No-Go 1.791" 5,636' Tubing tail/WLEG Perforation Summary 7"x 2-3/8"Baker"FH"Ret.pkr. 5,700' 2.41"ID. Size Spf Interval (TVD) `�n„m XN 2-3/8”HES XN-Nipple(1.875"pkg.bore) 5,712' OA sands :V, No-Go 1.791" 3 3/8" 6 5654'-5674' 4109'-4,120' , 5684'-5694' 4,126'-4132' ,r'„ 5,716' 6 2-3/8"Baker'E'Hydro Trip Sub OB sands (2.00"pkg.bore) 3 3/8" 6 WLEG 5,721' 5730'-5760' 4,153'-4171' ELMD Guns:HSD,3406PJ,HMX,60 deg.phase ® 1.75"ball. 5,859' 7"Halliburton Float Collar PBTD 5,943' 7"Halliburton float shoe • DATE REV.BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL No.:S-26i 06/11/03 MDO Completion Rig Doyon 14 API : 50-029-23150-00 BP EXPLORATION (AK) . RECEIVED STATE OF ALASKA • AKA OIL AND GAS CONSERVATION COM ION OCT 11 2013 REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon LJ Repair Well U Plug Perforations U Perforate Li Other pi MBE Treatment Performed: Alter Casing ❑ Pull Tubing0 Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other IS Re-enter Suspended Welt] 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Developments Exploratory ❑ 203-0 -0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service El 6.API Number: Anchorage,AK 99519-6612 50- -23150-60.00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0380109 • SBL MP -26LS ' 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): MA.,ne_cs; l &aC g�..,S$t c . 11.Present Well Condition Summary: Total Depth measured 5944 feet Plugs measur.. None feet true vertical 4280.24 feet Junk mea, red None feet Effective Depth measured 5859 feet Packer easured See Attachment feet true vertical 4229.88 feet true vertical See Attachment feet Casing Length Size MD D Burst Collapse Structural None None None None None None Conductor 76 20"X 34"215.5#A53 36-112 TVD- Surface 2899 9-5/8"40#L-80 35-2934 ./ - 5750 3090 Intermediate None None None None None None Production 5910 7"26#L-80 33-5943 ', ' \A - \1 7240 5410 Liner None None None j None�i.\ None None Perforation depth Measured depth 5730-5760 feet 0\ v True Vertical depth 4153.75-4171.4 f 1\t&\ Tubing(size,grade,measured and true vertical depth) 2- ."4.6#L-80 30-5721 - Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: n s 32013 Intervals treated(measured): NNE � U`. 'A. 5730'-5760' Treatment descriptions including volumes used and f al pressure: 5 Bbls 100 ppt HEC,442 psi; 15 Bbls Class G Ce .-nt,1030 psi;407 Bbls OrganaSeal Polymer, 1225 psi 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 599 736 Subsequent to operatio . 219 838 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development❑ Service 0 • Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas ❑ WDSPLU GSTOR ❑ WINJ In . WAG ❑ GINJ ❑ SUSP ❑ SPLUG0 17.I hereby certify that the . -going is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 313-288 Contact Ga atron Email Garry.CatronL BP.Com Printed Name 'Garry Catron Title PDC PE Signature . 4,.9G Phone 564-4424 Date 10/11/2013 RBDMS OCT 14 4 /0. ,,//, Form 10-404 Revised 10/2012 Submit Original Only • • Packers and SSV's Attachment ADL0380109 SW Name Type MD TVD Depscription MPS-26LS PACKER 5620 4016.17 2-3/8" Baker GT Dual Packer MPS-26LS PACKER 5700 4062.95 7 X 2.375 Baker FH Ret Packer • • (I) c c a L (13 - c n ([) 45 1.- In o ° " o ° a) _ rn ti a) 3 c v m �. o 3 -a c .n o 0 _a) U 0 ac) f° ate) y a) O * voi -i (1)•-O o.. aa) u°i < ° N -c < a) a) Q co ° ° ° * as ° co (0 o ° C E 6' v ° C O ° cn U O m(t) LO N a) \° o Q O II cn 3 O J L �i (� '(p a) Q O - +' Q L N U u) O E ,n n. Y 5 C7 U ° _0 —° -0 .� ° O 'n - aa) E CO -a O N Y a-+ O V) to C ao -a N u) O E ° 11) ° Q.) Q� m U � U � a) (Oj 0)N N4O .- LL LO I- O o , * lin a 77 u) 11 QQu) C d Q. Q� F N N ' u) � O * fnO U d a) Y Q� O W O O QO Q . L W .c L C O O m CO > (- n O E Q 0) O H c 0 � a. LI) N U d = C ° o _0 = U) a O (0 CO cts W `- O c a) O C Q o U W �[) 2 � O � W a) zp `t N � > coo � U > c N —5 $ u) aa) Jo a0i o = .o a0i cn o c d ° 0 a) U a.Y a°i a) E mY Q= ° � U) Q � o ° �_ o � aY0 Eo cn_ o 0 (°r) * °o - o... ° ` Q � L •U) c' .-.� o aim pm � o � Lo o ., Q0 O . N- O) t_n U O a) . U) ° Q a) ° (y ° b o ++ i~ a) L -- u) Q U) i5 Q > • J i5 O f0 O Cr) a) Q o Q to O N �O Q in in N a) E °" N o "' ° C N m "' ° ° r- °c) O - - E o E - d 2',2 -C2 °o °Ocn o u' " = o 0 .0' w aa)) ° caa as � � � ° ° cUnn _a O CD N: --' sa 11 2 ca n 0 a) CO 2 U) _ = O CO °' o N M -- —O N CO LO c 06 In N (O m 2 L. * 'E N O W * C Q W p W E O E O U) E J CO 13 j Q E U 3 E OJ Q E U CO Qp 0 O a o 2 0 N ra ,a a) Y Lu M > � I- c'3W E _ � 0 c � � __ 0 E co * c6 U) 9- * 03 0 0r) u) m a3 v > Ea '3 EOO -ca) -0 c * N °'°° m * -El J O -0 c * ,, ° °- n3 c E E .O O)•- O o a) rn•- (n O• Q r 'c O J C C Q' ° C C fl' O O O In C 7 u) C — Q C = L a) a) O U) t, >, a) a) O _ +o 6 0 - Q a N Cl) CO Q N Q Q 3 tm E E ° o co O - E > Y u) c E O O U) a) a) `- (0 O ON- o - U N Q O C N m O M O — Q� QU U o L ° U U o ° o E o.._1 ._ Q L QJ -ate a) Qq .- ° Qa 0)0 A 11 -a c co mO "- E m (� �' Qa ° •-• CI- o JYX c c mY U) _ cu ° - = . U u) o o . u) . o U) o u' a) U) o cn jz,.� U) U of -0 ° --.§. aa Lo 0 Q a°i ---.. c—a u) 45 0.)0 c6 � _ Q° — N a) N c c U c �- U c ° p II u) cn N CS -Cu) O U QU Q� - aa)) QU N a) >}>-, ,_ = N V N o_ N O E QYo EQYrnc/) 0_ > 0 E -0 �- o E � co > � dt a) N p N -6 .� a) N O N > v � .a) c �L" 1.1)_ c- U 0II — O � O o O (OQ U) �_ C O .0 L (() CO p c O O + Y N L + C o .C- cn 2 W a) N a) u) EL a) 0 c o E O a 0 m a) o .c D w a) 1 L L L () m N y, X O _i a) � > 2 = � '> v 'E 2 = c n 3 `°E' 1 1 cn 2 > (O .c co 2 5,9) - ca ° u-) (/) * IT) -° N O a) * 70 -c--) cow ° a) —_ co .O * o o N O * Oh- FN �i U) * U) N > (O Q* (/) CV c _o U) n.F- o . * Q� 2 Cl. * a._a M M co co co C- p • O O O O O N N N N N N co N co 6) 6) T co ■ • Tree: CIW 2 1/16"5M Dual III �2 • Wellhead:11"x 2 3/8"5M FMC dual string M P U S-26i Orig. KB Elev. =73.20 Hanger thread 2 3/8"EUE top and IBT bottom Orig. GL Elev. = 38.40 2"CIW-H BPV profile 20"x 34"insulated,215#/ft A-53 112' 9-5/8"40#/ft,L-80 BTC 2,934' J1 Short String p,/, Long String 2,981' 2-3/8"HES X-Nipple(1.875"pkg.bore) 2-3/8"HES X-Nipple(1.875"pkg.bore) 2,980' KOP @ 300' Max. hole angle=55 deg @ 3940' Hole angle thru perfs=54 DEG. 7"26#,L-80,BTRC Casing (drift id=6.151,cap.=.0383 bpf) 2-3/8",4.7#/ft L-80,IBT tubing (drift id=1.901,cap.=.00387 bpf) 5,578' 2-3/8"HES X-Nipple(1.875"pkg.bore) 2-3/8"HES X-Nipple(1.875"pkg.bore) 5,577' 7°x 2-3/8"Baker"GT"Ret.dual pkr. 5,620'1 ✓J/A2."J1/.Y113Jf/..i,Y5'J:'.f//G/d//ITSr".,r"llff 1.945"ID. , r. 5,620' 2-3/8"HES XN-Nipple(1.875"pkg.bore) XN No-Go 1.791" II 5,636' Tubing tail/WLEG Perforation Summary �' 7"x 2-3/8"Baker"FH"Ret.pkr. 5,700' Size Spf Interval (TVD) 'i XN 2-3/8"HES XN-Nipple(1.875"pkg.bore) 5,712' OA sandg ,r, No-Go 1.791" 3 3/8" 6 5654'-5674' 4109`-4,120' 7 6 5684'-5694' 4,126' 4132' -/ 2-3/8"Baker`E'Hydro Trip Sub 5,716' OB sands f (2.00"pkg.bore) 3 3/8" 6 WLEG 5,721' 5730'-5760' 4,153'-4171' ELMD Guns:HSD,3406PJ,HMX,60 deg.phase H 1.75"ball. 5,859' 7"Halliburton Float Collar PBTD 5,943' 7"Halliburton float shoe DATE REV.BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL No.:S-26i 06/11/03 MDO Completion Rig Doyon 14 API : 50-029-23150-00 BP EXPLORATION (AK) . ir .—........... . • oF 7,,, ‘,4„, /,_ . THE STATE S and Gas „ALASKA 6:,,T.:ii;__1,-1,.____Itt,..____14:2 Conservation Commission �� GOVERNOR SEAN PARNELL 333 West Seventh Avenue r,� O ff, Q. Anchorage, Alaska 99501 -3572 ALAS" Main: 907.279.1433 Fax: 907.276.7542 Alecia Wood SCANN `����� Petroleum Engineer © � l BP Exploration (Alaska), Inc. J. 03 P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Oil Pool, SBL MPS -26SS Sundry Number: 313 -287 Dear Ms. Wood: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 1 / Daniel T. Seamount, Jr. t (i._ Commissioner DATED this lr �day of June, 2013. Encl. • t (� ' STATE OF ALASKA (0 • ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well El Change Approved Program ❑ Suspend ❑ Plug Perforations❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown El Re -enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Other. MBE Treatment al 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number. BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 203-061-0 3. Address: — Stratigraphic ❑ Service 0 . 6. API Number.SO - OZy _ z3 /So - oo -q P.O. Box 196612, Anchorage, AK 99519 - 6612 50429 -23160 01 00 7. If perforating: 8. Well Name and Number. ?L What Regulation or Conservation Order governs well spacing in this pool? AA447.05 SBL MPS -26SS Will planned perforations require a spacing exception? Yes ❑ No El 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0380109 . MILNE POINT, SCHRADER BLFF OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5944.. 4280. 5859 1. 4230 . None None Casing Length Size MD TVD Burst Collapse Structural Conductor 76 20" X 34" 215.5# A53 36 - 112 36 - 112 Surface 2899 9 -5/8" 40# L -80 35 - 2934 35 - 2529.31 5750 3090 Intermediate None None None None None None Production 5910 7" 26# L -80 33 - 5943 33 - 4279.64 7240 5410 Liner None None None None None None Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (It): • 5654 - 5674 4109.26 - 4120.94 2 -3/8" 4.6# L -80 L -80 30 - 5636 Packers and SSSV Type: See Attachment for Packer Types Packers and SSSV MD (ft) and ND (ft): See Attachment for Packer Depths No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program El BOP Sketch ❑ Exploratory ❑ Development ❑ Service Q ' 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/30/13 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ ig . GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR El SPLUG El 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Alecia Wood Email Alecia Printed Name Alecia Wood Title PE Signature 4:.12. '\ Phone Date ( �j a ` it% 564 -5492 6/5/2013 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number 3 ✓/ - 0( 0 Plug Integrity ❑ BOP Test El Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes El No i Subsequent Form Required: / _ 4e4-- AHERO S //,,f97/3 BY Approved by: COMMISSIONER THE COMMISSION ate: Tr / /2fj3 Form 10 -403 Revised 1/2010 Appr valid for 12 months from the date of approval. Submit in Duplicate 04 ,\ \> RtGt I i '.. _ RBDMS JUN 2 0 201 6\ • • • . bp To: Mark O'Malley /Rob Handy Date: June 04, 2013 MPU Ops Team Leaders From: Alecia Wood, MPU Schrader Pad Engineer 907 - 564 -5492 Subject: MPS -26SS MBE Treatment Step Unit Operation 1 F Shut in all offset producers. Bullhead water into MPS -26SS 2 F Bullhead treatment down MPS -26SS (OA sand). Keep well and offset producers and injectors shut in for the duration of the treatment and flow producers to a tank before returning to production if necessary. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a cement acting fluid and a rigid gel. Measure of success 1. Treatments are displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is observed. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant fluid per guidance from the Environmental Team. Background MPS -26 is a dual completed injector with two strings of 2 -3/8" tubing in the Schrader Bluff. This injector was completed in June 2003 to support MPS -23 and MPS -25. The watercut in offset producer MPS -23 began to increase early 2009, and an MBE was confirmed with a positive red dye test on 4/11/09 in the OA. A Marcit gel treatment was pumped in August 2009 with no apparent success, and Thermatek cement and H2Zero polymer job was pumped in August 2011 that was successful in remediating the MBE. To date there have been 6 positive Red dye tests in the OA, the most recent of which on 05/06/13 confirming that the last MBE treatment pumped in August 2011 has broken down. • • PROCEDURE Stage 1. Injection Test 1. RU, hold pre job safety meeting, PT surface lines 2. Ensure offset producers are SI. 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. Stage 2. Treatment 5. Ensure offset producers are offline 6. Pump produced water pre -flush followed by cement acting fluid treatment and diesel displacement. Allow setup time. 7. Pump produced water pre -flush followed by high volume gel treatment and diesel over flush. 8. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 9. Rig down all equipment and hold post -job assessment meeting to capture learnings to be incorporated into future jobs. 10. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. S • Tree: clW 2 1/16' SM Dual string Wellhead:11' x 2 3/8" WRAC dual string MPU S- 26i Orig. KB Elev. = 7320 larger !Need 23/8" EINE top and IBT bottom Orig. GL Elev. = 38.40 2'CW-18PVpflle L 20" x 34" insulated, 215 *Ift A-53 I 112' I 9-5/8' 40 #/ft, L-80 BTC 1 2 Short String long String I 2,981' I 2-3/8' HES X-Nipple (1.875' pkg. bore) 2 1IES X-Nipple (1.875' pkg. bore) 1 2,980' 1 KOP 300` Max. hole angle =55 deg @ 3940' Hole axle thni perts =54 DEG. 7' 26#, 1-80, BTRC Caskig (Mt id = 6.151, cap.= .0383 bpr, 2-3/0% 4.7 Mt 1-80, ET tubing (drift id = 1_901, cap.=-103137 2-3/8' HES X-Nile (1.875' pkg. bore) 1 5,577'1 I 5 2-3/8" HES X-Nipple (1.875 pkg. bore) x 7' x2-y8'8er'GVRe1dualplr . 1 5,620 I 1.945' ID. I 5,620' I 2-318' HES XN-Nipple (1.875' pkg.. bore) No-Go 1.791" I 5,636' I Tubing tat WLEG Perforation Summary 7' x 2-3/8' Baker *FH" Ret. pkr. I 5 . 7 E 0 '1 2_41' ID. Size Spit Interval (TVD) 2-348° HES Xpple (1.875" pkg. bore) I 5,717 I No-Go 1.791' 33/8' 6 5654 - 5674' 410 9" - 4,120' 6 5684'- 5694' 4,126' - 4137 2-3/8' Baker 'E Hy sko Trks Sub 5116' 08 s 11111 (21X)" pkg. bore) 3 318' 6 WLEG 5,721' 5730' - 5760' 4,1531-4171 7 ELNOD Guns : HSO. 34061 HMX, 60 deg. phase I 5,859' I 7' H4Iiixirkon Float Collar PBTD a 1.75" baN. I 5,943' I Halliburton float shoe - DATE REV. BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyan 141 WELL No.: S 06/11/03 MIX) Cornpietion Pig Doyon 14 API : 50 BP EXPLORATION (AK) • Packers and SSV's Attachment ADL0380109 Well Facility Type MD Top Description TVD Top MPS -26SS PACKER 5620 2 -3/8" Baker GT Dual Packer 4089 MPS -26SS PACKER 5700 7 X 2.375 Baker FH Ret Packer 4136 • V OF � • wP I 7, s THE STATE Alaska Oil frty �► , ®f Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue O ALAS i p. 5 3 Anchorage, Alaska 99501 -3572 , Main: 907.279.1433 Fax: 907.276.7542 Alecia Wood Petroleum Engineer / ' BP Exploration (Alaska), Inc. ao 3-0 10 P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Oil Pool, SBL MPS -26LS Sundry Number: 313 -288 Dear Ms. Wood: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, s Q1 1. 7 Daniel T. Seamount, Jr. Commissioner DATED this i° day of June, 2013. Encl. 0 0 iti(b STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS . .,1:' 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Other. MBE Treatment © • 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number. BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 203-061-0 3. Address: Stratigraphic ❑ Service 0 , 6. API Number. So _ 0 ),5 - 13 i Co - co -co P.O. Box 196612, Anchorage, AK 99519 -6612 3 7. If perforating: 8. Well Name and Number. G ic r ) l3 What Regulation or Conservation Order governs well spacing in this pool? AA447.05 SBL MPS -26LS • Will planned perforations require a spacing exception? Yes ❑ No ❑ 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0380109 MILNE POINT, SCHRADER BLFF OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5944 t • 4280 • 5859 • 4230 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 76 20" X 34" 215.5# A53 36 - 112 36 -112 Surface 2899 9 -5/8" 40# L -80 35 - 2934 35 - 2529.31 5750 3090 Intermediate None None None None None None Production 5910 7" 26# L -80 33 - 5943 33 - 4279.64 7240 5410 Liner None None None None None None Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 5730 - 5760 4153.75 - 4171.4 2 -3/8" 4.6# L -80 L-80 30 - 5721 Packers and SSSV Type: See Attachment for Packer Types Packers and SSSV MD (ft) and ND (ft): See Attachment for Packer Depths ' No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program 0 • BOP Sketch ❑ Exploratory ❑ Development ❑ Service 0 • 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/30/13 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ 12 ' GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Alecia Wood Email Alecia.Woodna BP.corrt Printed Name Alecia Wood Title PE Signature � Phone Date 0-(i..10 Z 564 -5492 6/5/2013 \ \\ COMMISSION USE ONLY ] Conditions of approval: Notify Commission so that a representative may witness Sundry Number 1 3 ,J Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes ❑ No li Subsequent Form Required: /C) 1- () 4 oil) APPROVED BY / r Approved by: % COMMISSIONER THE COMMISSION Date: f ✓ Form 10 -403 Revised 1/2010 Appr r t ' i s val for 1Y months from the date of approval. Sub Duplicate 1 0�4\ � c Q , RBDMS JUN 2 0 201 • • • bp To: Mark O'Malley /Rob Handy Date: May 8, 2013 MPU Ops Team Leaders From: Alecia Wood, MPU Schrader Pad Engineer 907 - 564 -5492 Subject: MPS -26LS MBE Treatment Step Unit Operation 1 F Shut in all offset producers. Bullhead water into MPS -26LS 2 F Bullhead treatment down MPS -26LS (OB sand). Keep well and offset producers and injectors shut in for the duration of the treatment and flow producers to a tank before returning to production if necessary. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a cement acting fluid and a rigid gel. Measure of success 1. Treatments are displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is observed. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant fluid per guidance from the Environmental Team. Background MPS -26 is a dual completed injector with two strings of 2 -3/8" tubing in the Schrader Bluff. This injector was completed in June 2003 to support MPS -23 and MPS -25. The injectivity of MPS -26LS began dramatically increasing in early 2009 and continued until the well was SI due to low injection pressure. The Matrix Bypass Event was confirmed with a red dye tracer survey pumped in 2009. This string was SI since December 2010 but brought back on injection in March 2011 for a red dye Epsom salt tracer survey to verify that the MBE is open and to help design this treatment. A Thermatek followed by H2Zero treatment was designed for this well. The thermatek stage of the design was pumped in August 2011, and the resultant post - thermatek injectivity test was unable to consistently inject into the well staying below 1700 psig. Roughly 1 bbl of un- Xlinked Kmax Gel and stringers of Thermatek was believed to be left in the casing during the treatment. A coil cleanout of the well was performed in September 2011, and the H2Zero portion of the MBE treatment was pumped soon afterward. The MBE treatment was considered a success, but it broke down sometime • • in mid -2012. There is currently an MBE from MPS -26LS and MPS -23 as confirmed by a positive red dye test in April 2013. PROCEDURE Stage 1. Injection Test 1. RU, hold pre -job safety meeting, PT surface lines 2. Ensure offset producers are SI. 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. Stage 2. Treatment 5. Ensure offset producers are offline 6. Pump produced water pre -flush followed by cement acting fluid treatment and diesel displacement. Allow setup time. 7. Pump produced water pre -flush followed by high volume gel treatment and diesel over flush. 8. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 9. Rig down all equipment and hold post job assessment meeting to capture learnings to be incorporated into future jobs. 10. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. . • • • Tree: cm 2 1116' 51, Dual string Weiheact11 x 2 318 SM RAC dual string MPU S-26i Orig. KB Elev. = 73.20 Hanger tweed 2 318" EUE top and IBT bottom Orig. GL Elev. = 38.40 2' C1W-H BPV profile I 20"x3 insufatecl, 2" 5 f.'t A-53 112 9-5/8' 40 tflft, L-80 BTC I 2 934 Short String '_ Long String I 2,981' I 2-318 FIES X-Ntpple (1.875 pkg. bore) ' X 4 2-3/8' HES X-tiippie (1.875' pkg. bore) I 2980' I KOP 300' Max. hole angle =55 deg @ 3940' Hole angle thrii pails =54 DEG_ r L-8O, BTRC Casing (drift id = 6.151, cap.= .0383 bpi"; 2-318', 4_7 a/ft L-80, IBT tubing (drift id = 1_9)1, cm).=.00387 Opt) I 1 2-3/8' HES X-Nipple .875' Pig bore" I 5,577'1 I 5.5 I 2-3/3" HES X-Nipple (1.875' Mtg. bore1 No■Imill x 2-3/8' Baker 'GT' Rat, dual pkr. 5,620' .945° la 5,62cr 1 2-318 HES XN-Nipple (1.575" pkg. Dora; No-Go 1.791" I 5,636' I Tubing tail ` Perforation Summary 7" x 2-318" Baker "PH' Flat_ pkr. I 5700 1 2.41 ID. Size Spf Interval (TVD) 2-318" HES XN-1"appie (1.875 pkg bore I 5,712' etiftulandx No-Go 1391' 3318' 6 5654' -5674' 4105 - 4,120' 6 5684' - 5694' 4,125 - 413Z 2-318" Baker '1E' Hydro Trip Sub 5.715 OB sands II. (ZOO" pkg. boie) 3318' 6 ViLEG 5 721' 5730' - 5760 4,1534-4171 aim G41113 :1 34064 MAX, 60 deg. rilase 1.75"b 5 859' I 7' Halliburtcn Float Collar PI3TD I 5,943' I 7 Hallibuiton float shoe DATE REV. BY COMMENTS MILNE POINT UNIT 0519102 MOO Of Sled by Cased Doyen 141 WELL No.: S-261 08111103 Completion Rig Doyon 14 API : 50 BP EXPLORATION (AK) ♦ • • • Packers and SSV's Attachment ADL0380109 Well Facility Type MD Top Description TVD Top MPS -26LS PACKER 5620 2 -3/8" Baker GT Dual Packer 4089 MPS -26LS PACKER 5700 7 X 2.375 Baker FH Ret Packer 4136 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 SLANNEDFEB 2 ?OIL December 30, 2011 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 0 „ ) 333 West 7 Avenue n 3 tU I Anchorage, Alaska 99501 M W Subject: Corrosion Inhibitor Treatments of MPS -Pad '� Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft Pal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 , 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS -09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 102 7/29/2011 MPS-17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS -20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 102 7/28/2011 MPS-25 2021030 50029230890000 Open Flutes - Treated •-•----�f MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS-29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7282011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7282011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7282011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/182011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/62011 MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other 0 MBE TREATMENT Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ ■ 203 -0610 3. Address: P.O. Box 196612 Stratigraphic❑ Service El 6. API Number: — Go - o Anchorage, AK 99519 -6612 . 50- 029 - 23150=8944. 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 380109 • MPS -26LS 10. Field /Pool(s): MILNE POINT FIELD / SCHRADER BLUFF POOL 11. Present Well Condition Summary: Total Depth measured 5944 feet Plugs (measured) None feet true vertical 4280.24 feet Junk (measured) None feet Effective Depth measured 5859 feet Packer (measured) 5620 5700 feet true vertical 4229.88 feet (true vertical) 4089 4136 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20 "X34" 215.5# A -53 36 - 112 36 - 112 Surface 2899' 9- 5/8 "40# L -80 35 - 2934 35 - 2529 5750 3090 Production 5910' 7" 26# L -80 33 - 5943 33 - 4280 7240 5410 Production Liner 9 f, Liner r C ! J 9 Ui • Perforation depth: Measured depth: 0 5730 - 5760 - }'� True Vertical depth: O 4153.75 - 4171.4 - _ _ Tubing: (size, grade, measured and true vertical depth) 2 -3/8" 4.6# L -80 30 - 5721 30 - 4148 Packers and SSSV (type, measured and true vertical depth) 2 -3/8" Baker GT Dual Packer 5620 4089 7 X 2.375 Baker FH Ret Packer 5700 4136 RECEIVED' 12. Stimulation or cement squeeze summary: SEP 0 7 211111 Intervals treated (measured): Aliens Oft & Gas Cams. Commission Treatment descriptions including volumes used and final pressure: Anngrtip 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 739 736 Subsequent to operation: 14. Attachments: 15. Well Class after work: A Copies of Logs and Surveys Run Exploratory Development ❑ Service El Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: „ Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ID WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 311 -183 Contact Joe Lastufka Printed Na - Joe Lastu i t& Title Petrotechnical Data Technologist • Signatu - , � Phone 564 -4091 Date 9/7/2011 NM 1' 77- RBDMS SEP 0 8 201 Form 10 -404 Revised 10/2010 g •� Submit Original Only • • MPS -26LS DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY J �.✓Y+�..F±x ' ` � ,..e:. V F .�' °'i,iyY�� ]i: �., '. :,, ", ', . <, r " a -3 'aE 9F A i g ww ,,r -',-5�"^` ^:mot "'s;'.���': ". �'S. ... `�" < "�':�``s <ia��,;.o.''�.. ... _<:,, ...,�.�.�`.`�?r -� . �... 8/10 /2011;"* *Thermatek Treatment on S- 26LS * ** T /IA/OA 470/0/0. Pre thermatek injection :test: Lead in with 2 bbl's diesel, 20 bbl's PW, 4.6 bbl's K -max gel. Pumped 22.8 bbl's when gel hit perfs, Pressure leveled off at 38 bbl's pumped, 15 bbl's into the MBE. Pump an additional 66 bbl's PW. Thermatek treatment: Lead in with 2 bbl's PW, 3 bbl's K -max gel, 15 bbl's Thermatek, 2 bbl's K -max gel, 4 bbl's Thermatek, 2 bbl's !non X linked K -max gel, 8 bbl's PW, 21.9 bbl's diesel. Stage treatment leaving 1 bbl K -max gel in the tubing. ** *Job complete * ** 8/11/2011; ** *Post Thermatek injection test MPS - 26LS * ** T /IA/OA 530/0/0 Attempted to break ;circulated, work pressure up to 1550 psi and bleeding back off to the return tank !through 1/2" hose without success. Rig up loop to by pass the the check valve on !the tree so we can bleed off quickly. Continue to rock pressure up to as high as 1680: psi, bleeding to zero, started to see some movement both in pressure breaks and :fluid flowed back. Worked for about 4 hours, estimate approx. 1 bbl worked past the - perfs but unable to establish injection. Bleed the tubing to zero and shut in the well. T /IA/OA 530/0/0 ** *Job complete for now * ** 8/12/2011; ** *Post Thermatek injectivity test MPS - 26LS * ** Continue attempting to establish injection. Pressure up to 1500 psi, bleeding off to tank then repressure, getting some !pressure breaks but unable to establish an injection rate. ** *Job complete for now, will re- attempt post S -20 H2Zero treatment * ** 8/13/2011: ** *Post Thermatek injection test on MPS - 26LS * ** Able to establish injection at 0.5 bpm, 1190 psi, bled well back to return tank and ran pressure up numerous times. ! Injection rate worsened until it plugged off again. It appears that there is only one 'pert hole we are injecting into which continues to plug off and hold pressure, need CTU to jet across the perfs before attempting the H2Zero treatment. ** *Job Complete * ** 3 • • FLUIDS PUMPED BBLS 50 DIESEL 130 PW 11.6 K -MAX GEL 19 THERMATEK 210.6 TOTAL • • Tree: CIW 2 1/16" 5M Dual string M PU S - 26� j 1 „,..,,..,,, Wellhead:11" x 2 3/88" 5M FMC dual string Orig. KB Elev. = 73.20 :f : Hanger thread 2 3/8" EUE top and IBT bottom Orig. GL Elev. = 38.40 2" CIW -H BPV profile 20" x 34" insulated, 215 #/ft A -53 1 112' 1 i „,,.... ..„ 4.,„..... p..„, , „. ... ,, ,,,,,.., ..,,,.. ., 4,. .... ... , „.,.. 9 -5/8” 40 # /ft, L -80 BTC 1 2,934' I «. Short String Long String x 2,981'1 2 -3/8" HES X- Nipple (1.875" pkg. bore) x 2 -3/8" HES X- Nipple (1.875" pkg. bore) 1 2,980` I F l KOP @ 300' Max. hole angle = 55 deg @ 3940' ` Hole angle thru perfs = 54 DEG. ' r..; mo" ; r j 7" 26 #, L -80, BTRC Casing iiTA rat, (drift id = 6.151, cap.= .0383 bpf) 2 -3/8 ", 4.7 #/ft L -80, IBT tubing (drift id = 1.901, cap. = .00387 bpf) ;ille A x 2 -3/8" HES X- Nipple (1.875" pkg. bore) I 6,677'1 1 5,578' 12 -3/8" HES X- Nipple (1.875" pkg. bore) x Err- 7" x 2 -3/8" Baker "GT" Ret. dual pkr. 1 5,620' I 1.945" ID. 5,620'1 2 -3/8" HES XN- Nipple (1.875" pkg. bore) xN No -Go 1.791" 1 5,636' I Tubing tail / WLEG . C `- A Perforation Summary 7" x 2 -3/8" Baker "FH" Ret. pkr. 1 5,700` 2.41" ID. Size Spf Interval (TVD) A XN 2 -3/8" HES XN- Nipple (1.875" pkg. bore) 1 5,712` I OA sands P'fi, No -Go 1.791" 3 3/8" 6 5654` - 5674' 4109' - 4,120' -. -' 6 5684' - 5694' 4,126' - 4132' 2 -3/8" Baker 'E' Hydro Trip Sub I 5,716' 1 OB sands (2.00" pkg. bore) 3 3/8" 6 WLEG 5,721' 5730' - 5760' 4,153' -4171' ELMD i I Guns : HSD, 3406PJ, HMX, 60 deg. phase II I I Q B 5,859' I 7" Halliburton Float Collar PBTD 0 1.75" ball. 1 5,943' I 7" Halliburton float shoe DATE REV. BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL No.: S -26i 06/11/03 MDO Completion Rig Doyon 14 API : 50 -029- 23150 -00 BP EXPLORATION (AK) STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMIS1ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other Ei MBE TREATMENT Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waived] Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ • 203 -0610 3. Address: P.O. Box 196612 Stratigraphic❑ Service El 6. API Number: 00— — Anchorage, AK 99519 -6612 • 50- 029 - 23150- '81•90 8. Property Designation (Lease Number) : ,. 9. Well Name and Number: ADLO- 380109 . MPS -26SS 10. Field /Pool(s): MILNE POINT FIELD / SCHRADER BLUFF POOL 11. Present Well Condition Summary: Total Depth measured 5944 feet Plugs (measured) None feet true vertical 4280.24 feet Junk (measured) None feet Effective Depth measured 5859 feet Packer (measured) 5620 5700 feet true vertical 4229.88 feet (true vertical) 4089 4136 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20 "X34" 215.5# A -53 36 - 112 36 - 112 Surface 2899' 9 -5/8" 40# L -80 35 - 2934 35 - 2529 5750 3090 Production 5910' 7" 26# L -80 33 - 5943 33 - 4280 7240 5410 Production tf1� Liner S F 9 ZO1 Liner Perforation depth: Measured depth: 0 5654 - 5674 0 5684 - 5694 _ True Vertical depth: 0 4109.26 - 4120.94 0 4126.79 - 4132.64 - - Tubing: (size, grade, measured and true vertical depth) 2 -3/8" 4.6# L -80 30 - 5636 30 - 4099 Packers and SSSV (type, measured and true vertical depth) 2 -3/8" Baker GT Dual Packer 5620 4089 7 X 2.375 Baker FH Ret Packer 5700 4136 RECEIVE)* 12. Stimulation or cement squeeze summary: SEN 0 7 2011 Intervals treated (measured): basks Oil & Gas Cos. 6Qrm issron Treatment descriptions including volumes used and final pressure: Anthesrss 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 644 526 Subsequent to operation: 435 792 14. Attachments: 15. Well Class after work: e Copies of Logs and Surveys Run Exploratory Development ❑ Service 0 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ 0' WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: r 311 -184 Contact Joe Lastufka Printed Name oe Lastu - Title Petrotechnical Data Technologist Signatu e Phone 564 -4091 Date 9/7/2011 RBDMS SEP 0 8 ZQi� tm /�/ Form 10 -404 Revised 10/2010 c l q • �• � � Submit Original Only • • MPS -26SS DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 91 ry 1 �,M�"'►��„ „ „ v2 3 ,, 1 Y1'..., ' s ..r..'.. „ . ; . r .., .. .. . .. , ^; . : `� ... , , wa' . , a .,, ., .: ak r '4 % ..' , '� y , . 8/9/2011 { ** *Thermatek Treatment on MPS- 16SS * ** T /IA/OA 400/0/0. Pre thermatek injection . 'test: Lead in with 2 bbl's diesel, 13bbI's PW, 5 bbl's K -max gel, 18.2 bbl's PW when i ;gel hit perfs, pump an additional 66 bbl's PW. Thermatek treatment: Lead in with 2 bbl's PW, 3 bbl's K -max gel, 6 bbl's Thermatek, 2 bbl's K -max gel, 6 bbl's Thermatek, 32 bbl's K -max gel, 4 bbl's Thermatek. 2 bbl's non -X- linked K -max gel, 8 bbl's PW, .21.7 bbl's diesel. Stage treatment leaving 1 bbl K -max gel in the tubing. ** *Job complete * ** 8/14 /2011' ** *Injectivity test post Thermatek MPS - 26SS * ** Able to get the well to start taking injection at 0.32 bpm 1340 psi. Will work on cleaning up the perfs better after pumping the H2zero treatment on S -16LS. ** *Complete for now * ** 3 { 8/14/2011 i ** *Injectivity test post Thermatek S- 26SS * ** Pump_15bbl's diesel at 0.7 bpm.a1211_ psi. Injection good, order out H2zero ** *Job Continued on 8/15/11 * ** 8/15/2011: * * *H2Zero treatment on MPS - 26SS * ** Lead in with 5 bbl's diesel, pump 415 bbl's ' H2Zero at 0.60 bpm, 1000 pst, displace with —43 bbl's diesel, Note: There was 50 bbl's on the diesel tanker but the pump truck was not able to hold a prime so BBL ;count was off and and estimated the volume from tank straps. ** *Job Complete * ** 3 ' i , • • FLUIDS PUMPED BBLS 80 DIESEL 108 PW 14 K -MAX GEL 14 THERMATEK 415 H2ZERO 631 TOTAL • • • Tree: CIW 2 1/16" 5M Dual string Wellhead:11" x 2 3/8" 5M FMC dual string M P U S-26i Orig. KB Elev. = 73.20 Hanger thread 2 3/8" EUE top and IBT bottom Orig. GL Elev. = 38.40 2" CIW -H BPV profile f 's =.. „:„; I.7; i J: /„.., 20” x 34" insulated, 215 #/ ft A-53 112' „1„,,,,,,, : 2 r f 9 -5/8" 40 # /ft, L -80 BTC 12,934' Short String , { a Long String I " � 2 -3/8" HES X-Nipple (1.875" pkg. bore) 2,980' 2,981` I 2 - 3/8" HES X- Nipple (1.875" pkg. bore) PP ( P 9 ) ;r iii' l�l %/ KOP @ 300' A. Max. hole angle = 55 deg @ 3940` Hole angle thru perfs = 54 DEG. 1 / Z sf r 7" 26 #, L -80, BTRC Casing e (drift id = 6.151, cap.= .0383 bpf) �; � 2 -3/8 ", 4.7 # /ft L -80, IBT tubing r y (drift id = 1.901, cap. = .00387 bpf) , 2 -3/8" HES X- Nipple (1.875" pkg. bore) I 5,577 1 5,578' I 2 -3/8" HES X- Nipple (1.875" pkg. bore) , s f,, A �f A 7" x 2 -3/8" Baker "GT" Ret. dual pkr. I 5,620' uron , , ,,, rr mrrru rrui� 1.945" ID. I 5,620'I 2 -3/8" HES XN- Nipple (1.875" pkg. bore) xN No -Go 1.791" I 5,636' I Tubing tail / WLEG i o ff Perforation Summary r ° 7" x 2 -3/8" Baker "FH" Ret. pkr. I 5,700` Dili io moimoi Size Spf Interval (TVD) OA sands XN 2 -3/8" HES XN- Nipple (1.875" pkg. bore) 1 5,712' I ®� No -Go 1.791" 3 3/8" 6 5654' - 5674' 4109' - 4,120' 6 5684` - 5694' 4,126' - 4132 ,%S 2 -3/8" Baker `E' Hydro Trip Sub I 5,7161 OB sands (2.00" pkg. bore) 3 3/8" 6 WLEG 5,721' 5730' - 5760' 4,153' -4171' ELMD Guns : HSD, 3406PJ, HMX, 60 deg. phase O4 1.75" ball. 1 5,859' I 7" Halliburton Float Collar PBTD 1 5,943' I 7" Halliburton float shoe 1 DATE REV. BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL No.: S -261 06/11/03 MDO Completion Rig Doyon 14 API : 50 -029- 23150 -00 BP EXPLORATION (AK) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Wednesday, July 13, 2011 Jim Regg '7 P.I. Supervisor KQ l 7 / 1 41 f( SUBJECT: Mechanical Integrity Tests l BP EXPLORATION (ALASKA) INC S -26 FROM: Bob Noble MILNE PT UNIT SB S -26 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry J NON - CONFIDENTIAL Comm Well Name: MILNE PT UNIT SB S - 26 API Well Number: 50 029 - 23150 - 00 - 00 Inspector Name: Bob Noble lnsp Num: mitRCN110708144507 Permit Number: 203 - 061 - Inspection Date: 7/7/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well S -26 ' Type Inj. W ' TVD 4089 - 1 IA 40 1940 - 1880 1875 , P.T.Di 2030610 'TypeTest SPT Test psi 1940 ' OA 325 510 510 510 , Interval 4YRTST p/F P ' Tubing i 550 550 550 550 Notes: Pti,N, relCi -C e)4 Ic f„' :< " %! ' 1 JUL 1 Pt 201'1 Wednesday, July 13, 2011 Page 1 of 1 • • j SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION / ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Keith Lopez Petroleum Engineer Obi BP Exploration (Alaska), Inc. a D3` a b / P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Pool, MPS -26SS Sundry Number: 311 -184 w JUN 0 3 2D Dear Mr. Lopez: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. -`' Chair DATED this 3 day of June, 2011. Encl. „ COVED STATE OF ALASKA ” ' . (� -�7 ' . ALASKA AND GAS CONSERVATION COMMISSIO4 ''411 1 ?U1 _ , APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 AIsaka Oil & Cas Cor. G mmissjo 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool Repair Well ❑ ChOnitteredli Program ❑ Suspend ❑ Plug Perforations ❑ Perforate❑ Pull Tubing ❑ Time Extension ❑ Operation Shutdown ❑ Re -enter Susp. Well ❑ Stimulate❑ Alter Casing ❑ Other: MBE TREATMENT ( G k/ 0 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 203 -0610 - 3. Address: P.O. Box 196612 Stratigraphic ❑ Service 0 _ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23150 - (3}00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: - Spacing Exception Required? Yes ❑ No ❑ MPS - 26SS 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 380109 - MILNE POINT Field / SCHRADER BLUFF Pool - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5944 - 4280.24 - 5859 - 4229.88 - NONE NONE Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20 "X34" 215.5# A -53 36 112 36 112 Surface 2899' 9 -5/8" 40# L -80 35 2934 35 2529 5750 3090 Production 5910' 7" 26# L -80 33 5943 33 4280 7240 5410 Liner Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): SEE ATTACHED - - 2 -3/8" 4.6# L -80 30 5636 Packers and SSSV Tvoe: 2 -3/8" Baker GT Dual Packer Packers and SSSV MD and TVD (ft): 5620 4089 7 X 2.375 Baker FH Ret Packer 5700 4136 12. Attachments: Description Summary of Proposal 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service El - 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/11/2011 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ 0 - GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Keith Lopez Printed Name Keith Lopez Title PE Signature _ Phone Date v 564 -5718 5/28/2011 Prepared by Joe Lastufka 564 -4091 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 31 "' lt4 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Subsequent Form Required: ii0 - zip y APPROVED BY Approved by a / COMMISSIONER THE COMMISSION Date: j 7.3/1/ = s JUN 03 201 RIGIA �'� '1��`4 1 Form 10 -403 Revised 1/2010 Submit in Duplicate MPS -26SS _ 203 -061 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS -26SS 6/11/03 PER 5,654. 5,674. 4,109.26 4,120.94 MPS -26SS 6/11/03 PER 5,684. 5,694. 4,126.79 4,132.64 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN • OH OPEN HOLE • bp • • To: Mark O'Malley /Rob Handy Date: May 26, 2011 MPU Ops Team Leaders From: Keith Lopez, MPU Schrader Pad Engineer 907 - 564 -5718 Subject: NIPS-26SS MBE Treatment Step Unit Operation 1 F Shut in all offset producers. Bullhead water into MPS -26SS. 2 F Bullhead treatment down MPS -26SS (OA sand). Keep well and offset producers and injectors shut in for minimum of 2 days and flow producers to a tank before returning to production. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a cement acting fluid and a rigid gel. Measure of success 1. Treatments are fully displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is seen. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant fluid per guidance from the Environmental Team. • PROCEDURE Stage 1. Injection Test 1. RU, hold pre job safety meeting, PT surface lines 2. Ensure offset producers are SI. 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. • i Stage 2. Treatment 5. Ensure offset producers are offline 6. Pump produced water pre -flush followed by cement acting fluid treatment and diesel displacement. Allow setup time. 7. Pump produced water pre -flush followed by high volume gel treatment and diesel over flush. 8. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 9. Rig down all equipment and hold post job assessment meeting to capture learnings to be incorporated into future jobs. 10. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. . • . • 411 Tree: CIW 2 1/18" 5M Dual string Wellhead:))' x 2 318' 5M FMC dual string M P U S -26 i Orig. KB Elev. = 73.20 Hanger thread 2 3/8" EUE top and IBT bottom Orig. GL Elev. = 38.40 2' CIW -H BPV profile lk I 20" x 34' insulated, 215 Nit A -53 I 1* 2' 9 -5/8' 40 *Mt L -80 BTC 2,934' Short Solna I Iona String 2,981' I 2 -3/8' HES X- Nipple (1.875" pkg. bore) I I 2 -378' I-ES X- Nipple ±'.875' pkg. bore) 12,988C' KOP @ 300' Max. hole angle = 55 deg @ 3940' Hole angle thro perfs = 54 DEG. 7' 28#, L -80, BTRC Casing (drift id = 8.151, cap. .0383 bpi) 2 -3/8', 4.7 #15 L-80, IBT tubing (drift id = 1.901, cap. = .00387 bpf) 1 5,578' I 2 -3/8° HES X- Nipple (1.875" pkg. bore) I 2 -3, 8' HES X- Nipple (1.675' pkg. bore) I 5.577 7' x 2 -3/8" Baker'GT Ret dual pkr. 1 5,820' I 1.945" ID. I 5,820' I 2 -3/8' HES XN- Nipple (1.875" pkg. bore) No-Go 1.791 - CA 1 5,636' I Tubing tail/ WLEG Perforation Summary I 1 uni■N 7' x 2 -3/8" Baker'FH" Ret. pkr. I 5.700' I 2.41' ID. Size Spf Interval (TVD) M. nA sand` 2 - 3/8' HES XN- Nipple (1.875" pkg. bore) 1 5,712' I No-Go 1.791° 3 3/8" 8 5654' - 5874' 4109' - 4,120' 8 5684' - 5694' 4,128' - 4132 2 -318° Baker 'E' Hydro Trip Sub I 5,718' OR sands (2.00" pkg. bore) 33/8° 6 WLEG 5,721' 5730' - 5780' 4,153' -4171' E1.MD Guns : HSD, 3408PJ, HMX, 60 deg. phase 1 5,859' I 7' Halliburton Float Collar PBTD d 1.75' ball. 1 5.943' I 7' Halliburton float shoe A 11 ' DATE REV. BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL Na.: S 26i 08/11/03 MDO Completion Rig Doyon 14 API : 50- 029 - 23150 -00 BP EXPLORATION (AK) • • I 7 ;, ,. , JJ SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Keith Lopez Petroleum Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 0 (01 Anchorage, AK 99519 -6612 D 3 Re: Milne Point Field, Schrader Bluff Pool, MPS -26LS Sundry Number: 311 -183 Dear Mr. Lopez: JUN 0 3 Z 011 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, � % /- Iv Daniel T. Seamount, Jr. Chair �✓ DATED this 3 day of June, 2011. Encl. • a STATE OF ALASKA i� ALASKA AND GAS CONSERVATION COMMISglOill. OrA'Y 1 1 ? ��� APPLICATION FOR SUNDRY APPROVALS 6 -/ - !! 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool Repair Well ❑ a ghiSilf•OMPANiiiiNka Suspend ❑ Plug Perforations ❑ Perforate Pull Tubing .71'''1iitetxtension Operation Shutdown ❑ Re -enter Susp. Well ❑ stimulate El Alter Casing ❑ Other: MBE TREATMENT C(>6) 151 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 203 -0610 - 3. Address: P.O. Box 196612 Stratigraphic ❑ Service 0 6. API Number: Anchorage, AK 99519 -6612 50- 029- 23150-J -00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ❑ No ❑ MPS -26LS 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 380109 - MILNE POINT Field / SCHRADER BLUFF Pool - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5944 • 4280.24 - 5859 - 4229.88- NONE NONE Casing Length Size MD TVD Burst Collapse Structural Conductor 76' 20 "X34" 215.5# A -53 36 112 36 112 Surface 2899' 9 -5/8" 40# L -80 35 2934 35 2529 5750 3090 Production 5910' 7" 26# L -80 33 5943 33 4280 7240 5410 Liner Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): SEE ATTACHED - - 2 -3/8" 4.6# L -80 30 5721 Packers and SSSV Type: 2 -3/8" Baker GT Dual Packer Packers and SSSV MD and TVD (ft): 5620 4089 7 X 2.375 Baker FH Ret Packer 5700 4136 12. Attachments: Description Summary of Proposal El 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service - El 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/11/2011 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ 0 • GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Keith Lopez Printed Name Keith Lopez Title PE Signature V .-7/ Phone Date "1/565/ 564 -5718 COMMISSION USE ONLY 5/28/2011 Prepared by Joe Lastufka 564-4091 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 1 1 \ " t SS r 6 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Subsequent Form Required: /6-4/04/ APPROVED BY /� Approved by: ' COMMISSIONER THE COMMISSION Date: d3/0( / . � l�DMS JUN 0 3 SIT G C Z' « 0 R 1 G 1 4 evsd 1/2010 ' \j A L MPS -26LS 203 -061 - PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS -26LS 6/11/03 PER 5,730. 5,760. 4,153.75 4,171.4 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • 411 bp To: Mark O'Malley /Rob Handy Date: May 26, 2011 MPU Ops Team Leaders From: Keith Lopez, MPU Schrader Pad Engineer 907 - 564 -5718 Subject: MPS -26LS MBE Treatment Step Unit Operation 1 F Shut in all offset producers. Bullhead water into MPS -26LS. 2 F Bullhead treatment down MPS -26LS (OB sand). Keep well and offset producers and injectors shut in for minimum of 2 days and flow producers to a tank before returning to production. OBJECTIVE 1. Divert water by sealing the preferential path of injection with a cement acting fluid and a rigid gel. Measure of success 1. Treatments are fully displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. 3. Decrease of watercut over time in offset producers is seen. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient. • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant fluid per guidance from the Environmental Team. PROCEDURE Stage 1. Injection Test 1. RU, hold pre -job safety meeting, PT surface lines 2. Ensure offset producers are SI. 3. Spear in with Methanol, followed by produced water. Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure /rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate /pressure continue with remainder of program. • • Stage 2. Treatment 5. Ensure offset producers are offline 6. Pump produced water pre -flush followed by cement acting fluid treatment and diesel displacement. Allow setup time. 7. Pump produced water pre -flush followed by high volume gel treatment and diesel over flush. 8. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 9. Rig down all equipment and hold post -job assessment meeting to capture [earnings to be incorporated into future jobs. 10. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. • • • Tree: CIW 2 1/16' 5M Dual string G Wellhead:11' x 2 3/8' 5M FMC dual string M P U S -26 i prig. KB Elev. = 73.20 Hanger thread 2 3/8' EUE top and IBT bottom Orig. GL Elev. = 38.40 2' CIW -H BPV profile 20' x 34' insulated, 215 4/ft A -53 1 112' 9 -5/8' 40 #/ft, L-80 BTC 1 2,934' Short String I nna String 2,981' 2 -3/8' HES X- Nipple (1.875' pkg. bore) I I 2 -3/8' HES X- Nipple 0.875' pkg. bore) 1 2,98E KOP @ 300' Max. hole angle = 55 deg P. 3940' Hole angle thou pert?, = 54 DEG. T 284, L -80, BTRC Casing (drift id = 6.151, cap.= .0383 bpf) 2 -3/8', 4.7 4/ft 1-80, IBT tubing (drift id = 1.901. cap =.00387 bpf) 1 5,578' I 2 -318' HES X- Nipple (1.875' pkg. bore) ( 2 -3/8' HES X- Nipple (1.875" pkg. bore) I 5,577 7' x 2 -3/8' Baker °GT' Ret dual pkr. 1 5,620' I 1,945° ID. I 5,820'1 2 -3/8' HES XN- Nipple (1.875' pkg. bore) 7""'" No-Go 1.791" 5,636' I Tubing tail / WLEG Perforation Summary 7' x 2 -3/8' Baker 'FM" Ret pkr. I 5,700' I 2.41' ID. Size Spf Interval (TVD) na saw i� 2-3/8' HES XN- Nipple (1.875' pkg. bore) 1 5.712' I No-Go 1.791" 33/8" 6 5654' -5674' 4109' - 4,120' 6 5684' - 5694' 4,126' - 4132' 2- 318° Baker 'E' Hydro Trip Sub I 5,716' OR saner (2.00' pkg. bore) 3 3/8" 6 WLEG 5,721' 5730' - 5760' 4,153' -4171' ELMD Guns : HSD, 3406PJ, HMX, 60 deg. phase '5 *1J0 1.75' ball. 1 5.859' ( T Halliburton Float Collar PBTD I 5.943' J T Halliburton float shoe 4 1 • DATE REV. BY COMMENTS MILNE POINT UNIT 05/19/02 MDO Drilled by Cased Doyon 141 WELL No.: S -26i 06/11 /03 MDO Completion Rig Doyon 14 API : 50 -029- 23150 -00 BP EXPLORATION (AK) • Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, June 02, 2011 4:19 PM To: 'Lopez, Keith' Subject: RE: MPS -26 MBE (PTD 203 -061) Thanks for the explanation... as I mentioned please include a brief summary outlining the well issues for MBE treatments in the future. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Lopez, Keith [mailto:lopek3 @BP.com] Sent: Thursday, June 02, 2011 3:24 PM To: Schwartz, Guy L (DOA) Cc: Lastufka, Joseph N (SAIC); McEntyre, Scott R; Igbokwe, Chidiebere; Lopez, Keith Subject: RE: MPS -26 MBE (PTD 203 -061) Guy, You will be receiving a total of 4 sundry requests for MBE treatments this summer. Here is some more details on the need for these jobs. MPS -26SS - Is an OA injector supporting MPS -23 & MPS -25. This well has shown a steady increase in injectivity since '03 and currently has very high injectivity for the Schrader Bluff (1060 bwpd @ 459 psig). An MBE was confirmed with MPS -23 via a red dye tracer in '09. A successful treatment will decrease the injectivity of the well and lower the water cut in MPS -23 (currently 80 -90 %). MPS -26LS - Is an OB injector supporting MPS -23 and MPS -25. The injectivity of this string showed a dramatic increase in '09 until it was SI due to low injection pressure. A red dye test confirmed that this string had developed an MBE with MPS -23 also. A successful treatment will decrease injectivity of the well to allow for bringing it back on injection and lower the water cut in MPS -23 (currently 80 -90 %). MPS -16LS - Is an OA injection string supporting MPH -08, MPS -19A, and MPS -17. This string also showed a dramatic increase in injectivity in '09 that continued until it was SI due to low injection pressure (1000 bwpd @ 610 psig). Subsequent red dye tests showed the string to have an MBE with both MPS -19A and MPS -17. A successful treatment will decrease the injectivity of the string to allow for bringing it back on injection and lower the WC of MPS -19A (98 %) and of MPS -17 (93 %). MPS -20SS - Is an OA injection string supporting MPH -08 and MPS -17. This well also has extremely high injectivity and can not inject without the help of a downhole choke to reduce the injection rate and supply back pressure. An MBE between it and MPS -17 was confirmed with a red dye tracer. It is believed that this well may also have an MBE to MPS -19A in this zone but this has not been tested. A successful treatment would decrease the injectivity to not need the downhole choke to keep online and decrease the WC in MPS -17 (and potentially MPS -19A). Let me know if you need any additional info. 6/2/2011 Page 2 of 2 Keith Lopez Wells & Subsurface Engineer Milne Point - Alaska BP Exploration Alaska, Inc. Office (907)- 564 -5718 Cell (907) - 903 -5432 From: Schwartz, Guy L (DOA) { mailto:guy.schwartz @alaska.gov] Sent: Thursday, June 02, 2011 1:19 PM To: Lopez, Keith Subject: MPS -26 MBE (PTD 203 -061) Keith, Can you elaborate on the MBE operation planned for this MPS -26 ?? I see you are pumping into both SS and LS .... Is there an MBE in both sands ( 08 and OA) ?? Which producers are affected ... etc. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 6/2/2011 ~~ ..: f ~,,, ~ ~--~ ~ ,.: ~ a ` i I 4 ~ 4°: ~ ,r ~~~ ~ ~ ~ ~~~.~ ~ ~ P~~ ~ ~¢~' ~~ ~ '~ ~~a~ ~ ~~, ~ ~ ~ ~ ~f ~ ~ ~ ~` ~ ~ ~ ~`°" p ~ ` ~ ~ ~ &~ ~ ~ ~ ~ ~ ~ SEAN PARNELL, GOVERNOR ~~,~ ~~ ~ ~~ e.~ ~~ ~~.a } ~ ~ ~ ~~~~ ~,.~~ a~a ~ ~ ~; ~ ~, ~ ~ ~- ~ ALASS-A OIL A1~TD G~5 ~ CO1~T3ERQATIOl~T COMDIISSIOI~T ~ 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 ~ PHONE (907) 279-1433 FAX (907) 276-7542 October 20, 2009 Mr. Harry Engel Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 ~~~,,,t~~~~~~ ~,~:~, ~ ~ ~~~~ Anchorage, AL 99519-6612 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPS-02, MPS-09, MPS- l0A and MPS-26 203-127, 202-020, 205-125 and 203-061 BP Exploration (Alaska) Inc. ~ Dear Mr. Engel: Enclosed are the work descriptions for subsurface well treatments in the listed wells that were erroneously submitted containing information and operational details proprietary to BP. These work descriptions have been replaced vuith the edited documents you supplied. Sincerely, ~.~ Thomas E. Maunder, PE Sr. Petroleum Engineer Enclosures (4) ~p c.0 pi~ S c~~,t rc- /~" ~ ~~~ • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF ~SUNDRY WELL OPERATIONS ., ,~< ~ ,;~~ ~ ~ ~, ~,.~ ~ ~ .: ~ r~' i~ ~ ;` ~.~ j`t 1. Operations Abandon ~ Repair Well Plug Perforations ~ Stimulate~ ~:%pt~er` ,~ ~~` ~~'~ '' Performed: Alter Casing ~ Pull Tubing ~ ~'erforate New Pool ~ Waiver~ Time Extension ~; Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Weil [] 2. Operator BP Exploration (Alaska), Inc. 4. Current Weil Class: 5. Pertnit to Drill Number: Name: Development ~ Exptoratory ~ 203-0610 , 3. Address: P.O. Box 196612 Stratigraphic r S~C2 ~ 6. API Number: Anchorage, AK 99519-6612 50-029-23150-00-00 , 7. KB Etevation (ft): 9. Well Name and Number: 73.2 KB MPS-26 SHORT STRING ~ 8. Property Designation: 10. Field/Pool(s): ADLO-380109 Mitne Point Unit Field/ Schrader Btuff Pool ~ 11. Present Well Condition Summary: Total Depth measured 5944 feet ~ Plugs (measured) No~e ~ true vertical 4280.24 feet Junk (measured) None Effective Depth measured 5859 feet / true vertical 4229.88 feet Casing Length Size MD ND _. _.-. Burst Collapse Conductor 112 20" 215# A-53 Surface - 112 SurFace - 112 Surface 2934 9-5/8" 40# L-80 35 - 2934 35 - 2529 5750 3090 Production 5943 7" 26# L-80 33 - 5943 33 - 4280 7240 5410 , ~ °~1 3 ~, . ri.l~,> , . L, u,.ua _ ,•. . Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 2-3/8" 4.6# short string L-80 SURFACE - 5636' 2-3/8" 4.7# LONG STRING L-80 SURFACE - 5721' 7" 20' ~"d"` ThZS`~~~ ~ " baker gt ret dual pkr 56 Packers and SSSV (type and measured depth) x2-3/8 1 _ 7"x2-3/8" baker fi ret pkr 5700' b~--cQ ~~c~ ~~C1~ 0 0 ~~`5 `- _ 0 0 ~~ ~ 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 761 735 Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run EXp101"dtOry r Development (- Service ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil r Gas r WAG ~ GINJ I~ WINJ 1~ WDSPL I~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 309-218 Contact Paige Sloan Printed Name Paige Sloan Title Production Engineer Signature Phone 564-4278 Date 9/1/2009 Form 10-404 Revised 04/2006 ~ ~~~~ J~~ 4f ~ Z~~g ~~Iy~ ;~ ;;"~SnbLmit Original Only ~.y °Z'~ M PS-26 203-061 srnr w7'TwnuwIC61T • Sw Name Operation Date Pert Operation Code Meas Depth Top Meas Depth Base Tvd Depth To Tvd Depth Bas MPS-26 6/11/03 PER 5,654. 5,674. 4,109.26 4,120.94 MPS-26 6/11/03 PER 5,684. 5,694. 4,126.79 4,132.64 MPS-26 6/11/03 PER 5,730. 5,760. 4,153.75 4,171.4 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PWG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVE SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • ~ ~ MPS-26SS DESCRIPTION OF WORK COMPLETED NRWO OPERATIOS EVENT SUMMARY ACTIVITY DATE ~ _ ~~ 06/Aug/2009 Gel Treatme~t, RU SLB batch mixer and pump van. Pump injectivity test. Pump gel stage with cross link additive. Half way through job discover that additive pump was not addinq cross link. Confer with town engineers and decide to pump stage over with new additive um . Job cont' on 8/7/09. 07/Aug/2009 Gel Treatment Cont' from 8/6/09 WSR. Pump gel with cross link per program and freeze protect well with methanol. Notify pad operator of well status. RD and move pumping operations to MPS- 09. *"*Job Com lete*** FWIDS PUMPED BBL5 10 Methanol 530 Gel 108 Produced Water • • Maundsr, Thomas ~ (UC?P-} From: Engel, Harry R [Harry.Engel@bp.com] Sent: Wednesday, August 12, 2009 7:49 AM To: Maunder, Thomas E (DOA) Subject: Revised Procedures for AOGCC re: MPU gel treatments Attachments: MPS-02 Gel Treatment.doc; MPS-09LS Gel Treatment.doc; MPS-10LS Gel Treatment.doc; MPS-26SS Gel Treatment.doc ~-~03-~ CQ ~ ~~ ~ ~ ~~ ~~ MPS-02 Cef MPS-09L5 Gel MPS-~QLS Gel MPS-26SS Gel reatment.doe (110 .('reatment.d~ (il..~reatment,doc (10..fre~tmer~t.doc (85.. Good morning Tom- Enclosed are the procedures I propose for the Milne Pt. Sundries. Please review and let me know if these meet your needs. If so, I recommend we substitute these for what was previously submitted. Thanks for your assistance in this matter. Harry Engel Engineering Team Leader Alaska Drilling & Wells ~~~l~E~~ NQ ~J ~ ~ 200~ ~~ To: From Subject: • Mark O'Malley/Jerry Sharp MPU Well Operations Supervisor Paige Smith, MPU Schrader-S Pad Engineer MPS-26 SS Gel Job ~~7~ - ~ ~Q ` • Date: June 22, 2009 Step Unit Operation 1 O Shut in all offset producers and offset injector. Bullhead 10 bbl gel into MPS-26 SS. 2 O Bullhead ~500 bbl gel down MPS-26 SS. Keep well and offset producers and injectors shut in for minimum of 7 days and flow producers to a tank before returnin to production. OBJECTIVE 1. Divert water from its preferential path. Measure of success 1. Gel treatments are fully displaced into formation. • 2. Post injection is adequate to achieve injection rate target at below target pressure. CRITICAL ISSUES Ensure pumping pressure is not above the fracture gradient (~800 psi for MPS- 26SS). Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant gel per guidance from the Environmental Team. PROCEDURE Stage1. Injection Test 1. RU, hold pre-job safety meeting, PT surface lines 2. Ensure offset injectors and producers are SI 3. Spear in with 1-2 barrels of Methanol, pump 50 bbls produced water preflush, 10 bbls gel and 50 bbls produced water over flush. Pump at 1 bpm with a max pressure 1000 psi (frac pressure + estimated friction). Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure/rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate/pressure continue with remainder of program. • ~ Stage 2. High Volume Gel Treatmenf 5. Ensure offset injectors and producers are offline 6. Pump 35 bbls produced water preflush, ~500 bbls gel and 40 bbls produced water over flush followed by 10 bbls freeze protect. Pump at 1 bpm or a max pressure 1000 psi WHIP (frac pressure + estimated friction). However, injection pressure limits may be exceeded as necessary to avoid trashing the wellbore by leaving gel in the tubing or liner. 7. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 8. Rig down all equipment and hold post-job assessment meeting to capture learnings to be incorporated into future jobs. 9. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. ~ ! T~e: CIW 2 11t8" 5M oual strinA We~ead:1 r x 2 3/8' 5M FMC dual strinp Har~er tt~read 2 3J8° EUE top and 18T boftc 7 CIW-H BPV profile 2d" x 34" ~sulaEed, 215 ~t A-63 112' M P U S~2 V ~ Orig. KB Elev. = 73.20 Orig. GL Elev. = 38.40 6-5J$' 40 #nt, L-8U BTC 2.934' , Short Strina 2,981' Z~fB" ~EES X-Nipple (1.875' pkg. bore) KOP ~ 300` Ntax. ho{e tngle = 55 deg ~ 394D~ Hole ~~e thru perfs = 54 DEG. 7` 28~', L-S6, 6TRC Casing {drif# ed = 8.151, cap = .0383 bpf¢ 23f8", 4.7 #Ht L-BD, IBT luba~e (drift id = 9.6E11, cap =.00387 bpF} 5,578' 2-3i8° HES 7C-Nipple {1.875' pkg. 6orea 5.6~' 2-3J8` HES XN-NiPpfe (1.875' pkg_ bori No-C,o 1.791' 5.636' Tubing tai ! 1N~EG Pertaration Summary Size Spf Infervel {NDj 3 3/8" 8 na U.~.~~ 5954' - 5874' 4108' - 4, 920' g 58$4' - 5664' 4.128' - 4132' 3 3f8" 8 bg sap~ 5T30' - 5788' 4.153' ~t71' Gun~s : HSD. 349SPJ, HMX. 80 deg. phase 5,859' 7` }~~yu~ Ftoat Collar PBTD ~ 5,843' 7" Hall~uton ibet shoe DATE REV. BY CAMN4ENTS ~5119f02 M~O Drilied by Cased Qoyon 141 OBl11I03 MDO Completian Rig Dayon 14 L~a Strina 2A3' l8" HES X-Nipple (1.875' pkg, bore) 2,98U' 2-J' IB" HES %-N~Pfe (1.875' pkg. bore) 5.577' T x 2~'8' Baker "GT R$t du~ pkr. 5,82[I' 1.945" ID_ T x 2-318" Baker'FH' Ret. pkr. 5,700' 2.41' ID. 2-3J8` HES XN-NiPpFe (1.875' pkg. bore} 5.792' No~'ao 1.791' 2-3J8" Beker E' Hydro Trip Sub 5.718' (2-00" Pk9- bore) WLEG 5.721' ELMD 1.75` b~l. MILNE POINT UNIT WEL.~ D10.' 5-261 API : 50-429-23150-00 BP EXPL~RATIfJN ~AK) STATE OF ALASKA ' r~J~~~ i~~ ALA~ O!L AND GAS CONSERVATION COMMI~ON ~.~ ~J APPLICATION FOR SUNDRY APPROVALS ~ ~- ~n aar: ~~ ~Rn ~~~ ~~~~~~ ,~ ~ ~~ ~J ~ ~ 5 2~09 ~ ~;~: ~~~ d'~; ~ 3;~~ ~ar~sd ~omm~s~io~ 1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Waiver Othe Aiter casing ~ Repair well ^~ Plug Perforations ^ Stimulate [] Time E~ension ~ POLYMER JOB. • Change approved program ~ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well ~ ~~` 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ~ Exploratory ~ 203-0610 ° 3. Address: P.O. Box 196612 Stratigraphic ~ Service ~ 6. API Number: Anchorage,AK 99519-6612 50-029-23150-00-00 • 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ^ No ^ MPS-26 ° 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADLO-380109 73.2 KB Milne Point Unit Field / Schrader Bluff Pool 12• PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5944 . 4280.24 5859 4229.88 NONE NONE Casing Length Size MD ND Burst Collapse Structural 112 20" 215# A-53 SurFace 112 SurFace 112 Conductor 2934 9-5/8"40# L-80 35 2934 35 2529 5750 3090 Surface 5943 7" 26# L-80 33 5943 33 4280 7240 5410 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): SEE ATTACHED - - 2-3/8" 4.6# SHORT L-80 Surface - 5636' 2-3/8" 4.7# LONG L-80 Surface - 5721' Packers and SSSV Type: 7"x2-3/8" baker FH ret pkr Packers and SSSV MD (ft): 5700' 7"x2-3/8" baker gt ret dual pkr 5620' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detailed Operations Program ~ BOP Sketch ~ Exploratory ^ Development ~ Service Q' 15. Estimated Date for 16. Well Status after proposed work: Commencing Operations: 7/8/2009 Oil ^ Gas ^ Plugged ^ Abandoned [] 17. Verbal Approvai: Date: WAG ^ GINJ ^ WINJ Q, WDSPL [] Commission Representative: Prepared by Gary Preble 564-4944 18. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Paige Smith Printed Name pai ith Title Production Engineer Signature ~ Phone Date 564-4728 6/24/2009 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~~ Plug Integrity ^ BOP Test ~ Mechanical Integrity Test ^ Location Clearance ^ Other: ~~.r~`~~~~~~s; sU~ ~ ~' ZOq~ ~~ ~S`~ T~SV\~5 ~i 1`l)l~~ ` ~ ' ~ e11 l S~ n."~\ ~1Q.h°~ `l Sub i t F R ~~~~ ~~`{ 5~~~~ ~ ~ d sequen orm equ re : ~j2 ti t~c-~V~~~ APPROVED BY / Approved by: COMMISSIONER THE COMMISSION Date: ~/ v i 2Q~9 ~~~~U~~~ k; Form 10-403 Revised 06/2006 ~l r ~ ~ `..+` ~ ~ ~ ~~ ~-- ~~ ~ ~~z.~:~ Submit in t2 ~~~f M PS-26 203-061 PERF ATTACHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth To Tvd Depth Bas MPS-26 6/11/03 PER 5,654. 5,674. 4,109.26 4,120.94 MPS-26 6/11/03 PER 5,684. 5,694. 4,126.79 ' 4,132.64 MPS-26 6/11/03 PER 5,730. 5,760. 4,153.75 4,171.4 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVE SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • , ,~ , ~ ~ Tree: Gw z v19- sAA Dual shvg c We~Ip,ed:11' x 2 3/8' 5M FMC d~l stinp M P U S~~ V ~ Harqr thread 2 3J8" EUE top and 18T baUom Z' CIW-H BPV proile Orig. KB Elev. = 73_20 Orig. GL Elev. = 38_40 20' x 34' ins~Aated, 275 NHt A-63 117 B-5f8' 40 iilR. L-80 BTC 2.934' , Short Strina 2,887' 2-3f8' HES X-Nipple (7.875' pkg. bore) 1.~.aiWQQ 2~/8' HES X-Nippla (1.873' pkg. bae) 2.980' K~P ~ 300` Mex. hole angle = 55 deg ~ 39~W' Flole angle thru perfs = S4 DEG. Y 2BAt. L-8U. BTRC Cas~g (drift id = B_151, cep.= .D383 bpf) 2~B'. 4_7 ~lfft L-90. IBT hibi~g (drift id = 7 _801. cap =_00387 bp~ 5,578' Z~lB' HES XJ~ipple (1.875' plag. bore) 5,82D' 2-3f8' HES XN-Nipple (1.875' pil~ bore) No-Co 1791' 5,838' Tubi~ tai ! YYLEG Pertoration Summary Siae Spf Interval (TVD) 3 3l8" 8 ns ~..,d~ 5854' - 5874' 41 dD' - 4.120' e 5884' - 5994' 4.128' - 4132' 3 318' 8 ~~i90di 5730' - 5790' 4.153' ~4771' Guns : HS~. 34UBPJ. HI`OC, 80 deg phase 5,859' T HaG6urEon Flost Cdlr P9TD ~ 5.043' T Haihb~rEa~ floet shoe DATE REW. BY CQARulENTS 05M9N2 MOO DriUed by C~ed Doyon /41 oar~ ~roa e~o ~«w~+ ~ ~ra+ 1a 23l8' HES X-Nipple (1.875' pkg. bare) 5.577' T x 2~1' l8' Beker'GT Ret dual pkr. 5.82U' 1.945' ID. T x 2~18' Baker'FH' Ret pkr. 5,700' 2.41' D. 2~J8' HES XN-Nipple (1.875' plr~. bore) 5,717 IJo-(3o 1.791' 2~f8' Baker ~' Hydro Trip S~ 5.718' (2.U0' pky. bore} WLEG 5,721' Q~ 1.75' beH_ MILNE POINT UNIT VYELI. No: S,26i API : 50-029-7_3150-00 BP EXPLORATION (AK) ~ ~ • , REVISION #2 ~~ BP Exploration Alaska Milne Point To: Jerry Sharp/Mark O'Malley Date: 5/13/2009 MPU Well Operations Supervisor From: Paige Smith IOR: . Schrader Bluff Production Engineer AFE: MSA,P~DWL10 COST: ~cz. ~ ~ S-- Ca-~ Su~ect: MPS-10(LS) IBP and Patch set with 1.5" CTU OBJECTIVES: Set a 1-11/16" Inflatable bridge plug in the liner of well MPS-10i to isolate the lower OB perforations which may have a Matrix Bypass Event (MBE) and set a tubing patch across a leak in the lower part of the long string tubing. PROPOSED STEPS: Category Step Description S 1 Pull flow regulator (XX Plug with hole in end cap) @ 2994' MD C 2 Pull 2-3/8" PXN plug & WFRV carrier from tailpipe C~ 6062' MD Set 1-11/16 Baker Inflatable Bridge Plug (IBP) @ 7500' MD Place 50' of calcium carbonate sluggits above IBP Inject ~3 tubing/liner volumes (150 bbls) down long string. Set 20' Weatherford 2-3/8" patch over a leak in the long string tubing atch element settin de ths: 5940' - 5960' MD Status: Schrader dual injector - currently SI Historic injection: 900 bwpd @ 0-400 psi 5~~' ~~~~~~9~~~',) ~~~C~ ~J ~i ~ 2Q09 Max Deviation: 93.5° AT 6,565'MD, >80° from 5,950'MD Min. ID: 1.791" in 2-3/8" HES XN nipple @ 6,062 MD Last TD tag: PBTD w/rig C~ 8828' MD Last Downhole Ops: SL set PXN plug & WFRV carrier on 12/7/08 Latest H2S level: N/A -Schrader injectors see minimal H2S <2ppm SBHPS: <1750 psi @ 4000'TVDss 2/1/09 BACKGROUND MPS-10 was drilled in June 2002 as a Schrader Bluff injector. In October of 2005 it was sidetracked to a new location and completed as a dual injector with two 2-3/8" tubing strings injecting separately into the OA and OB sands. • ! !~ REVISION #2 Memory gauges run into both the LS and SS tubing strings of MPS-10i on 7/12/06 have indicated pressure communication between the two strings. On 12/15/06 an E-line leak detection log found three separate leaks between from the long string to the straddled OA interval (short string) at 5855', 5887' and 5950' MD. All of the leaks occurred at tubing joints and a follow-up caliper survey indicated the internal tubing wall to have no significant corrosion. A follow-up injection profile survey found nearly 100% of injection down MPS-10i was being diverted into the OB regardless of which string was on injection. In June 2007 a plug was set in the tailpipe XN nipple of the long string to divert injection to the OA interval. However, by August 2007, this lack of OB injection is thought to be responsible for a lack on support and subsequent high GOR production from MPS-17. Injection was re-established into the OB interval and the MBE was found to be unhealed. After reviewing the OB injection support needs and likely MBE paths in the area it was decided to attempt an isolation of the lower OB perforation with a mechanical plug. Job Planninq • Because the well was completed with a 2-3/8" tubing tail and 4-1/2" liner, a conventional 4-1/2" retrievable plug will not pass thru the tubing tail. Instead, an IBP will have to be run. • With a minimum ID restriction of 1.791" thru the XN nipple at 6062' only the smallest of the commercially available IBP's will pass. The Baker 1-11/16" IBP has an OD of 1.69" and is rated to 2400 psi inside of 4.5" liner. • With such a low BHP (the well takes 900 bwpd on a near vacuum) care should be taken when pumping down the coil to avoid inflating the IBP in the wrong location. Past experience has shown that fluid inertia and overbalance can slam the IBP setting tool and prematurely inflate the IBP (This happened on L4-10). To minimize this, recommend pumping at ~1/4 bpm once the ball is over the gooseneck. This will minimize the slamming effect of a full column of water once the ball falls on seat. • Slickline has experienced trouble recovering plugs from the long string tubing tailpipe in times past due to high wellbore deviation. If slickline is unsuccessful in recovering the PXN plug & WFRV carrier coil may be required to pull the plug before the IBP set can be attempted. UPDATE: Due to the high deviation of the well SL was not been able to get past 6013'MD during pre coil work on 05/13/2009. • Please contact John Milne or Alan Holloway with Baker (659-2367) prior to the job to discuss the details of the IBP setup. Slickline 1. RU slickline unit to the Lonq Strinq on MPS-10i and recover the flow regulator (2 3/8" XX Plug with 7/32" hole in end cap) @ 2994' MD • • REVISION #2 2. Drift Dummy 2 3/8" Weatherford Patch as deep as possible (target depth of 6000' MD). Drift at the same speed that e-line would run a patch (i.e. no faster than 100 fpm so the spangs do not inadvertently overrun and tap the patch through an obstruction). 3. Perform static pressure survey with dual gauge carrier. Making one 2 hour stop @ 6000' MD and one 30 minute stop @ 5600' MD. CTU -1.5" Coil set IBP, iniectivitv test and tubinq patch set 4. MIRU 1.5" CTU to the Lonq Strinq of MPS-10i. 5. RIH and recover the PXN plug & WFRV carrier from XN nipple @ 6062' MD. (SL was unable to retrieve due to well deviation) 6. MU BHA with HDC and a 1.7" JSN nozzle. Note: tolerances are very tight, the BHA must pass through a 1.791" restriction, keep the BHA as slick as possible. 7. RIH with 1.7" JSN nozzle. 8. When JSN passes thru the tubing tail swap over to jet at max rate down the coil and wash liner down to 7600' pushing fluids into formation. Reciprocate several times across interval 7400'-7600' jetting at max rate to clean area where IBP will be set. Freeze protect down the backside with 50/50 meth water and POOH. 9. MU BHA with flush profile 1.5" coil head, DCV, HDC, 1-11/16" IBP settinq tool and 1-11/16" Baker IBP. Note: tolerances are very tight, the BHA must pass through a 1.791" restriction, keep the BHA as slick as possible. • Be sure to confirm the min ID thru the coil head and make sure the IBP setting tool requires a ball with a smaller diameter. • Pressure test lubricator down the backside only as per Baker procedure to avoid inadvertently inflating the IBP in the lubricator. 10.RIH with 1-11/16" IBP. 11. Run 1-11/16" IBP into lower 4-1/2" liner and set at 7500' MD following Baker Oil Tools setting recommendations. The exact setting depth is not important (no tie-in log required) as long as the IBP is set confidently between the two sets of OB perforations. Review the job planning section above for discussion about low reservoir pressure and how to avoid prematurely setting the IBP. Because the reservoir temperature is low (only 82°F), recommend pumping 100°F KCI and allowing inflation liquid to cool downhole after ball on seat ~ • REVISION #2 before completing inflation. This reduces the chance of having the IBP shrink in size (and pressure rating) as inflation fluid cools and shrinks after setting. Set down weight on plug and verify good set. 12. POOH with IBP setting tools. 13. MU BHA with HDC and a 1.7" big hole nozzle. 14. RIH and place 50' of calcium carbonate sluggits as close to the top of IBP as possible. Note: tolerances are very tight, the BHA must pass through a 1.791" restriction, keep the BHA as slick as possible. 15. POOH and if 2-3/8" tubing patch & running tools are available continue CT program with Step 16. Otherwise RDMO CT Unit. 16. Without rigging down the CTU initiate injection down MPS-10iLS. Please inject a minimum of 150 bbls water (3x liner&tubing volume) at a minimum of 1 bpm (1440 bpwd) without exceeding a maximum surface injection pressure of 1200 psi. If the IBP has successfully isolated the MBE in the lower OB perforations then a dramatic drop in injectivity should be quickly apparent. Make note if wellhead injection pressure exceeds 700 psi @ 1 bpm on a sustained basis by the end of the 150 bbl injection test. 17. MU BHA with memory GR/CCL. RIH to TD and log up to 100' above patch setting depth (approximately 5840'). Flag pipe. 18. POOH and download tie-in log and make depth correction for Patch set (ref. Composite WFL / Leak Detect Log Up Pass 40fpm Injecting SS run 15- Dec-2006 for Tie-in) 19. RIH with 20' tubing patch, correct depth at flag and set patch @ 5940' MD (top of upper patch sealing element). The patch is set to straddle the collar at 5950' MD. 20. POOH, RDMO CTU and turn the well over to operations. POINTS OF CONTACT: Jennifer Julian at 907-240-8037 (cell) or 907-274-0929 (home) or Paige Smith 907-564-4278 (W) or 907-222-3929 (H) or 301-580-2571 (M) MPU Wells Operation Supervisor: Jerry Sharp & Mark O'Malley Office:659-6333 Fax:659-6390 ~ . • • • - ~ ~ REVISION #2 • • ~_ ': ~-.._ .` ~,: t~ ~~ , MICROFILMED 03/01/2008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_Inserts\Microfilm_Max~er.doc . MEMORANDUM State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg (Î2J,,' 71'1.:-/lì 7 P.I. Supervisor ~f1' . - ' DATE: Monday, July 16,2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC S-26 MILNE PT UNIT SB S-26 Src: Inspector 8-03- 0 (p I Reviewed By: P.I. Suprv :.f§L Comm FROM: Lou Grimaldi Petroleum Inspector NON-CONFIDENTIAL Well Name: MILNE PT UNIT SB S-26 Insp Num: mitLG070714182138 Rei Insp Num: API Well Number: 50-029-23150-00-00 Permit Number: 203-061-0 Inspector Name: Lou Grimaldi Inspection Date: 7/14/2007 ; ,----- Well I S-26 ,Type Inj. I W TVD ! 4136 P.T.D! 2030610 iTypeTest I SPT Test psi I 1620 Interval 4YRTST ,~~ P/~ _~ _ Notes: ,6 barrels pumped, Good test I · IA L~ i OA ' Tubing ! 750 Initial 15 Min. 30 Min. 45 Min. 60 Min. 1620 T 1580 I 1570 i t I : ! I 350 I 350 ! 350 I I 700 ! 700 I 700 i I ~.~~~_-----.---..:.~~ ,"- Packer Depth Pretest 250 -- 700 Rt-tcbz-i'- ~~<-\ 4¿30 I occcor¡;{t.j .1::0 to -ita 7 do~k¿l 7 (lll~ 3. Jk;1?11 sCANNED JUL 2 0 ZOO? Monday, July 16, 2007 Page 1 of 1 ) WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 D¡e, ~O?>-cL \ February 16,2006 L3,4--\ RE: MWD Formation Evaluation Logs MPS-26, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPS-26: LAS Data & Digital Log Images: 50-029-23150-00 1 CD Rom , .: r t' IÏI\ tjnOR ,~ç^~~NEl> WU,\R ~~ ¿Qi (.. -l ".,; ~ (?1991oio lJJ~~ ~~~~ DATA SUBMITTAL COMPLIANCE REPORT 7/6/2005 Permit to Drill 2030610 Well Name/No. MILNE PT UNIT SB S-26 Operator BP EXPLORATION (ALASKA) INC MD 5944- TVD 4280 .-- Completion Date 6/12/2003""- Completion Status 1WINJ REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES/AIT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRRES, I Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name Rpt Directional Survey Rpt Directional Survey Rpt Directional Survey ED C Lis 11954 Induction/Resistivity Rpt 11954 LIS Verification Log Cement Evaluation ED C Pds 12842 Caliper log Log Log Run Scale Media No Final Final Final 1,2 1,2 5 Col 1 Log ~ Caliper log Blu Log 2 Blu .~ Induction/Resistivity Log Blu Induction/Resistivity 2 Current Status 1WINJ Spa¿ Ii ~ ~3. API No. 50-029-23150-00-00 0[Cn~..~ '-- Directional Survey Yes --- --- --" ------- ---- (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH ~- Received Comments -------- 0 5944 Open 6/2/2003 0 59./4 Open 6/2/2003 1~~ 0 ~ Open 6/2/2003 69 5944 Open 6/2/2003 69- 5944 Open 6/2/2003 0 5849 Case 12/12/2003 2791 5944 2931 5898 2931 5931 2931 5931 MWD Gyro GR, EWR4, ROP Slim Cement Bond Log - SCMT-BB & Primary Depth Control BOREHOLE PROFILE LOG,PLATFORM EXPRESSITVDfTRI PLE COMBO/MAX TEMP 90F BOREHOLE PROFILE LOG,PLATFORM EXPRESSITVDfTRIPLE COMBO/MAX TEMP 90F/DSN 12842 BOREHOLE PROFILE LOG,PLA TFORM EXPRESSITVDfTRIPLE COMBO/MAX TEMP 90F/DSN 12842 PLATFORM EXPRESSfTRIPLE COMBO/MAX TEMP 90/GRlCAUNEUTRON/RH 02 ------ -------~- Permit to Drill 2030610 MD 5944 NO 4280 DATA SUBMITTAL COMPLIANCE REPORT 7/6/2005 Well Name/No. MILNE PT UNIT SB S-26 Operator BP EXPLORATION (ALASKA) INC Well Cores/Samples Information: Completion Date 6/12/2003 Completion Status 1WINJ Name ADDITIONAL INFORMATION Well Cored? (J 1 N Chips Received? Y I~ '@N Analysis Received? Comments : Compliance Reviewed By: Interval Start Stop Sent Received \'~-L ~"'-~\. <~~ Daily History Received? Formation Tops ~ Current Status 1WINJ Sample Set Number Comments ~N tVN Date: API No. 50-029-23150-00-00 UIC Y --~_.~--- -- --------- - "--- ) .tl~. _ ~-------- - - 'J~r MECHANICAL INTEGRITY RE~ORT' , WEll NUMBER - ~V k', \",,- ?ð,~~ ~\>S-dCo\ ~dOs-O~\) :. I G R E L S}... S ~: - 5/\'-.,ò~ c..o~\Q. ~~ C:? I \ ~ -0 ~ OPER & FIELD :?UD DA:E: : ~~~LL DATA TD: &;<t4'-\.HD.. ~d~ TVD; ?BTD: S<6$S HJ? L··\,~~UTVD Casing: ~ Shoe: 5<;t.;'S HD TVD i DV: \-.J ~:HD ~. ~ ·T\i'D :":":1e!:": ~ ~ Shoe: \:) ~ till ~~ TVD j :-OP: ~ ~ l·m ~'~ ::"'¡D __ . . . ~ I . . 'c'è)-Ù S <0 ~ <0 _ ·.JD~:::;g : &)0. d '&"P 2.cke!. f5 :tD(}~.l) T\TD i Set. ê. t: .~'l ~ \ _::.ole S _.; ....", e c.. \J"'L \., ~ P r S~S-,-\ 5~ ~ '-\ ?." Àt. o q- a.n aNµ" e:r I .s ,«;<.0 C6 ""\ t 0 .C:;~ <;, '-\ .'\. "-' S")~o S~~O ~\S :-:ECr..Þl~IC;'.L INTEGRITY - P _lŒ.T f 1 Annulus Press Test: ~p ~Se>O ; 15 Iilin~'-\ìÇ; 30 min d'i")Ç". C omae. n t s: 'P. \\ ~ \ ~~~~ '-Þ...., C. "'.:, c \.::.... ~!<:.. '"\ I ~C -Ç;¡ "::, .,.,- . ¡ i i I I I I ; ¡ ; . ~ ~ . " MECRANIC.AL INTEGRITY - PART 42 \ "'> SG. 'o~\~ Cement Volumes :". .Amt. Line.r ~~ i Csg d'15'S'f: i DV ~~ . . Cï:üt: -"01 to cove:!:." perfs 'N"J ~()~ 'k.~ d~ ~~\!..&-c..~~\-- S;,",~\\,-'\c~~ -k:. Cf)~Q.:r~\> ~~"'SðO' . Theoretical TOC \4<Jd--~ ~~~ 0,", ~O'-O 't~ (~<;,ò\.)~ \"0 \.-. ~O,-\\.·\ 'oc.:~<"<'~ h~\A Ç. ~ \C)""c~'\ \t)9-\ J '.J Cement Bond Log (Yes or No) ~€'> ; In AOGCC File ~~'> CBL Evaluation, ::~ne. a.bove. pe.r:!ft\ \)" \ \" <...$ f>;IJ-a~\ ..)(,.'ISOOC0 C4.N\q.f\.~ \~\<'n..~ Proåu~tion Log: Typ~ Evaluation CONCLUSIONS: . ? art tl: ~ \"r ~<lIf'l©~~\Öv~ \ ? a.rê: :2: ""T: ~"?- \~tc'ß. ~ \'¢ f\.... -C 7:> , . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner DATE: July 20, 2003 C I ~ 1l1"")\tSUBJECT: Mechanical Integrity Test '(¿1't BPX MPU S Pad THRU: "Fern Maunder P.I. Supervisor FROM: Chuck Scheve Petroleum Inspector NON· CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. Well MPU 8-09 Type Inj. 8 TV.D. 4310 Tubing 1425 1425 1425 1425 Interval I P.TD. 202-020 Type test P Test psi 1078 Casing 600 2000 1975 1975 P/F f Notes: Initial test Well MPU 8-10 Type Inj. 8 TV.D. 4109 Tubing 1500 1500 1500 1500 Interval I P.TD. 203-067 Type test P Test psi 1027 Casing 650 2000 1900 1900 P/F f Notes: Initial test Well MPU 8-16 Type Inj. 8 TV.D. 4070 Tubing 1250 1250 1250 1250 Interval I P.T.D. 203-065 Type test P T est psi 1018 Casi ng 950 2025 1950 1950 P/F f Notes: Initial test Well MPU 8-18 Type Inj. 8 TV.D. 4238 Tubing 1450 1450 1450 1450 Interval I P.T.D. 202-242 Type test P Test psi 1060 Casing 850 2000 1975 1975 P/F f Notes: Initial test Well MPU 8-26 Type Inj. 8 TV.D. 4089 Tubing 1450 1450 1450 1450 Interval I P.TD. 203-061 Type test P Test psi 1022 Casing 1400 2500 2475 2475 P/F f Notes: I nitial test Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALTWATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover 0= Differential Temperature Test 0= Other (describe in notes) /' v/ 1/' ¡.// ¡/ Test's Details I traveled to BPXs S Pad in the Mime Point Unit and witnessed the initial MIT on the above listed 5 wells that were recently placed on injection. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed with all wells demonstrating good mechanical integrity. M.I.T.'s pertormed: §. Attachments: Number ot Failures: º Total Time during tests: 4 hours ~ MIT report form 5/12/00 L.G. 2003-0720 _M IT _MPU _ S-26 _ cS.xls 7/23/2003 ~. ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 07/17/03, Start Injection 1. Status of Well o Oil 0 Gas 0 Suspended 0 Abandoned 1m Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3281' NSL, 296' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 1269' NSL, 2988' WEL, SEC. 12, T12N, R10E, UM X = 563041. Y = 5997913 10. Well Number At total depth 1145' NSL, 3194' WEL, SEC. 12, T12N, R10E, UM X = 562836. Y = 5997787 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 73.2' ADL 380109 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 5/14/2003 5/18/2003 6/12/2003 17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 5944' 4280 FT 5859 4230 FT 0 Yes 1m No 22. Type Electric or Other Logs Run MWD, GR, RES I AIT, DT I BHC, CNL, LDL, GR, Caliper, SP, MRES, IFRlCASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE 20" 92# H-40 Surface 112' 42" 9-5/8" 40# L-80 35' 2934' 12-1/4" 7" 26# L -80 33' 5943' 8-1/2" Classification of Service Well Water Injection 7. Permit Number 203-061 8. API Number 50- 029-23150-00 9. Unit or Lease Name X = 565714, Y = 5999947 Milne Point Unit TUBING RECORD SIZE DEPTH SET (MD) 2-3/8", 4.6#, L-80 (Short) 5636' 2-3/8",4.7#, L-80 (Long) 5721' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 58 Bbls of Diesel 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 3-3/8" Gun Diameter, 6 SPF MD TVD MD TVD OA Sands OA Sands 25. 5654' - 5674' 4109' - 4121' 5684' - 5694' 4127' - 4133' NB Sands NB Sands 5730' - 5760' 4154' - 4171' 27. Date First Production 07/11/03 Date of Test Hours Tested MPS-26i 15. Water depth, if offshore 16. No. of Completions N/A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) CEMENTING RECORD ~60 sx Arctic Set (Approx.) 648 sx PF 'L', 250 sx Class 'G' 275 sx Class 'G' AMOUNT PULLED PACKER SET (MD) 5620' 5700' PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Water Injection PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL TEST PERIOD Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL GAs-McF CHOKE SIZE GAS-OIL RATIO WATER-BBL OIL GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SUbmij~~:f~::«!P:'tf::';:' , , ,', '.' \'. ~'''''J,' .' ~, .. " '¡ See Attachmed Core Summary Reports. ?8. _1Ft Jut 2 G 100~ JUt. ] ~i Form 10-407 Rev. 07-01-80 ORIGINAI,._ Submit In Duplicate RBDMS 8Ft JUl 2 ¿ 700.1 29. Geologic Markers Marker Name Measured Depth 5072' 5410' 5414' 5434' 5442' 5449' 5466' 5492' 5499' 5510' 5590' 5646' 5687' 5723' 5764' Top of Ugnu Zone B SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB SBA5 31. List of Attachments: True Vertical Depth 3765' 3965' 3967' 3979' 3984' 3988' 3998' 4014' 4018' 4024' 4072' 4105' 4129' 4150' 4174' ;( 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 32. I ~erebY certify that th~ f~~ping~Orrect to the best of my knowledge Signed sondr~wman ~lr:.....- Titl~ Technical Assistant Date Dt -ll-O~ MPS-26i 203-061 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 OR\G\NAL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ( (' JUL .~ -~~. ")°03 ( I_i . .. ,'.' ~\ r "t ,_"I.'.\.J .\ 1. Status of Well o Oil 0 Gas 0 Suspended 0 Abandoned DI Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3281' NSL, 296' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 1269' NSL, 2988' WEL, SEC. 12, T12N, R10E, UM X = 563041, Y = 5997913 10. Well Number At total depth 1145' NSL, 3194' WEL, SEC. 12, T12N, R10E, UM X = 562836, Y = 5997787 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit 1 Schrader Bluff KBE = 73.21 ADL 380109 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 5/14/2003 5/18/2003 6/12/2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 59441 4280 FT 5859 4230 FT DI Yes 0 No 22. Type Electric or Other Logs Run MWD, GR, RES I AIT, DT I BHC, CNL, LDL, GR, Caliper, SP, MRES, IFR/CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE 20" 92# H-40 Surface 1121 42" 9-5/8" 40# L-80 35' 2934' 12-1/4" 7" 26# L -80 33' 5943' 8-1/2" Classification of Servíêe WëH'" ,:-' Water Injection 7. Permit Number 203-061 8. API Number 50- 029-23150-00 9. Unit or Lease Name X = 565714, Y = 5999947 Milne Point Unit MPS-26i 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) CEMENTING RECORD ~60 sx Arctic Set (Approx.) 648 sx PF 'LI, 250 sx Class 'GI 275 sx Class IG' AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 3-3/8" Gun Diameter, 6 SPF MD TVD MD TVD OA Sands OA Sands 25. TUSING RECORD SIZE DEPTH SET (MD) 2-3/8",4.6#, L-80 (Short) 5636' 2-3/8",4.7#, L-80 (Long) 5721' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 58 Bbls of Diesel PACKER SET (MD) 5620' 5700' 5654' - 5674' 4109' - 4121' 5684' - 5694' 4127' - 4133' NB Sands NB Sands 5730' - 5760' 4154' - 4171' 27. Date First Production Not on Injection Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) N/A PRODUCTION FOR OIL-BsL TEST PERIOD GAs-McF WATER-BsL CHOKE SIZE GAS-Oil RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL -BSl GAs-McF WATER-Bsl OIL GRAVITY-API (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, app_~!~nt dips and presence of oil, gas or water. Submit core chips. ~6:~ :~":¡-;~;;i: i'=\~;r¡ ~ :.i ;':~:;: ~ ~. ~:!:~~:~~ '~\ßJ ~ '" ,.~:: ~ :,,;P:;;;:;,,~ [~tl{])[~v@ k;M;;;t ~F JJJl!~P See Attachmed Core Summary Reports. Form 10-407 Rev. 07-01-80 UH'bNA'~ Submit In Duplicate ( 29. Geologic Markers Marker Name Measured Depth 5072' 5410' 5414' 5434' 5442' 5449' 5466' 5492' 5499' 5510' 5590' 5646' 5687' 5723' 5764' Top of Ugnu Zone B SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB SBA5 True Vertical Depth 3765' 3965' 3967' 3979' 3984' 3988' 3998' 4014' 4018' 4024' 4072' 4105' 4129' 4150' 4174' 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Summary of Daily Drilling Reports, Surveys, Sidewall Coring Analysis Summary Reports and a Leak-Off Integrity Test Summary. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Son~~ . Title Technical Assistant Date 01-' D -~ MPS-26i 203-061 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit No. I Approval No. Drilling Engineer: Steve Campbell, 564-4401 31. List of Attachments: INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ( (' BP EXPLORATION Operations Summary Report Page 1 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-26 MPS-26 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/14/2003 Rig Release: 6/12/2003 Rig Number: 14 Spud Date: 5/14/2003 End: 5/19/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/14/2003 04:00 - 05:00 1.00 MOB P PRE Slide rig floor to move position 05:00 - 06:00 1.00 MOB P PRE Move rig off well MPS-04 - Spot over well MPS-26i 06:00 - 07:00 1.00 MOB P PRE Slide rig floor to drill position 07:00 - 08:00 1.00 MOB P PRE Rig up floor - Take on water 08:00 - 09:30 1.50 RIGU P PRE Accept rig @ 08:00 hrs - Nipple up divertor system 09:30 - 11 :30 2.00 RIGU P PRE Pick up HWT - Flex dc's - 4" dp - rack in derrick 11 :30 - 13:00 1.50 DRILL P SURF Pick up BHA to rig floor - Pick up MWD - stabilizers - walk through rig inspection 13:00 - 14:00 1.00 DRILL P SURF PJSM - Make up bit - set motor to 1.5 deg - make up MWD - MWD connection problem 14:00 - 16:00 2.00 DRILL N SFAL SURF Lay down MWD - check out MWD connection problem - (adapter tip was 1/2" too long - removing tip - pass through connect fell out - MWD operator replaced connector and adapter tip - made up subs - Con't make up BHA - MWD operator requested to break out connection to reconfirm continuity - it was confirmed connector was wrong type - tool damaged - replaced mounting head - reloaded - continue operation). 16:00 - 17:30 1.50 DRILL P SURF Continue make up BHA - Program MWD - make up Top Drive to stand of HWt 17:30 - 18:00 0.50 DRILL P SURF Function test divertor system - Preform accumulator test - witness of test waived by Jeff Jones of AOGCC 18:00 - 18:30 0.50 DRILL P SURF Pre spud meeting with all drilling personnel 18:30 - 19:00 0.50 DRILL P SURF Fill hole with mud - circ through circulating system - check for surface leaks 19:00 - 20:30 1.50 DRILL P SURF Spud in well MPS-26i @ 19:00 hrs - Drilling from 112' to 290'- WOB 10 to 15k - RPM 60 - TQ 1K - GPM 380 - PP 1050 20:30 - 21 :00 0.50 DRILL P SURF POH to pick up monel DC's 21 :00 - 22:00 1.00 DRILL P SURF Make up monel DC's for BHA 22:00 - 00:00 2.00 DRILL P SURF Directional Drill from 290' to 453' - WOB 25K - RPM 60 - TQ on btm 2 to 5K - TQ off btm 1 K - GPM 425 - PP on btm 1200 - PP off btm 1080 - PU 82K - SO 78K - ROT 82K 5/15/2003 00:00 - 20:00 20.00 DRILL P SURF Directional Drill from 453' to 9 5/8" casing point at 2941' - WOB 30 to 40K - RPM 80 - TQ on btm 8K - TQ off btm 4K - GPM 450 - PP on btm 2250 - PP off btm 2000 - PU 113K - SO 91 K- ROT - 105K 20:00 - 22:00 2.00 CASE P SURF Circulate hole clean 3 x btms up - 458 GPM - PP 2000 - 100 RPM - TQ 4K - PU 113K - SO 92K - ROT 105K 22:00 - 23:30 1.50 CASE P SURF Pump out from 2941' to HWT @ 815' - Full drlg rate 450 GPM- Hole in good shape - 23:30 - 00:00 0.50 CASE P SURF RIH from 815' to 2941' - No problems - hole good shape 5/16/2003 00:00 - 02:00 2.00 CASE P SURF Circulate hole clean 3 X BU - 500 GPM - PP 2050 02:00 - 03:00 1.00 CASE P SURF Pump out from 2941' to HWT @ 815' - Pump rate same as drilling rate 450 GPM - Hole in good condition 03:00 - 03:30 0.50 CASE P SURF Stand back 5" HWT - Flex Dc's 03:30 - 05:00 1.50 CASE P SURF Flush BHA with water - Lay down BHA - 05:00 - 05:30 0.50 CASE P SURF Clear rig floor 05:30 - 07:00 1.50 CASE P SURF Rig up to run casg - PJSM running 9 5/8" casg 07:00 - 07:30 0.50 CASE P SURF Make up float equipment - check floats 07:30 - 10:00 2.50 CASE P SURF Run 70 jts of 9 5/8" L-80 Btc 40# casg - PU 150K - SO 105K - 7 centralizers - 2 stop rings 10:00 - 10:30 0.50 CASE P SURF Make up hanger - Landing joint - Land casing - Lay down Franks fill up tool - Make up Halliburton cement head - Shoe Printed: 6/16/2003 2:06: 54 PM (" BP EXPLORATION Operations Summary Report Page 2 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PS-26 MPS-26 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/14/2003 Rig Release: 6/12/2003 Rig Number: 14 Spud Date: 5/14/2003 End: 5/19/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/16/2003 10:00 - 10:30 0.50 CASE P SURF depth 2934' - Float collar depth 2847' 10:30 - 11 :30 1.00 CASE P SURF Circulate / Condition mud for cement job - 360 GPM - 350 psi 11 :30 - 14:30 3.00 CASE P SURF Cement Job - Pump 10 bbls water - Test lines to 3500 psi - Pump 10 bbls water - Mix and pump 50 bbls Alpha spacer mixed @ 10.2 ppg (two gals dye first 5 bbls of spacer slurry) Drop btm plug last 5 bbls on the fly - Mix and pump 10.7 ppg Lead slurry to surface 648 sxs Class 'L' - yeild 4.15 cf/sx - 480 bbls - Mix and pump 15.8 ppg Class 'G' cement yeild 1.15 cf/sx - 250 sxs - 51 bbls - pumping rate 61/2 BPM @ 600 psi - Kick out top plug with 30 bbls of water with Halliburton - displace with mud using rig - 186 bbls - rate 8 BPM @ 800 psi - bump plug wiith 1800 psi - floats held - efficiency rate on rig pump 95.3% - CIP @ 14:07 hrs - 216 bbls cement to surface 14:30 - 16:00 1.50 CASE P SURF Remove cement head - Flush divertor - Back out / lay down landing joint 16:00 - 17:00 1.00 CASE P SURF Nipple down divertor system 17:00 - 18:00 1.00 CASE P SURF Nipple up FMC 12" metal to metal speed head - test seal to 1000 psi for 10 mins - test good 18:00 - 19:30 1.50 CASE P SURF Nipple up BOP's 19:30 - 20:00 0.50 CASE P SURF Rig up to test BOP's 20:00 - 23:30 3.50 CASE P SURF Test BOP's - Annular 250 low - 2500 high 5 min each test - Top pipe rams - Bottom pipe rams - Blind rams - Choke Manifold - Hyd Kill / Choke valves - Manual Kill / Choke valves - Upper / Lower (BOP valves - Floor safety valves - 250 Low 3500 High - 5 min each test - test good - Accumulator test preformed - John Crisp with AGOCC waived witness of BOP test. 23:30 - 00:00 0.50 CASE P SURF Rig down testing equipment - Pull test plug - Install wear ring - lay down test joint - close annulus valves 5/17/2003 00:00 - 00:30 0.50 CASE P SURF Safety School - Proper handling of rig tongs - Conducted by Doyon HSE Rep Terry Barr 00:30 - 02:30 2.00 CASE P SURF Pick up BHA # 2 - Bit - Motor set 1.22 deg - Pick up MWD - Make up same - Orient - Pulse test - Load RA sources Bit to Gamma = 37.68' Bit to Res = 45.32' Bit to DM = 74.52' Bit to SLD = 56.64' Bit to ACAL = 106.46' 02:30 - 03:30 1.00 CASE P SURF RIH from 758' to 2769' 03:30 - 04:30 1.00 CASE P SURF Cut Drlg Line - Service Top Drive 04:30 - 05:00 0.50 CASE P SURF Test 9 5/8" casing to 2500 psi - hold for 30 mins - record on chart - test good 05:00 - 06:00 1.00 CASE P SURF RIH tag plug @ 2944' - Drill plugs - Float collar - Cement- Shoe @ 2934 - 20' new hole rom 2941 to 2961' 06:00 - 07:00 1.00 CASE P SURF Circulate condition mud for FIT - Preform FIT - Mud weight 9 ppg - TVD 2529' - Pressure 340 = 11.5 EMW 07:00 - 00:00 17.00 DRILL P INT1 Drill from 2961 to 5770 - WOB 20k to 35k - RPM 120 - TO on btm 9K - off btm 8K - GPM 400 - PP on btm 2400 - off btm 2180 - PU 166k - SO 95K - Rot 121K (CONTROL DRILL FROM 4400' AT 250 FPH OR LESS FOR LOGGING) "OB" Base @ 5764' 5/18/2003 00:00 - 01 :00 1.00 DRILL P INT1 Directional Drill from 5770' to 5944' TD of 8.5" hole - WOB 20k to 35K - RPM 120 - TO on btm 9K - off btm 8K - GPM 400 - PP Printed: 6/16/2003 2:06:54 PM ( ( BP EXPLORATION Operations Summary Report Page 3 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-26 MPS-26 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/14/2003 Rig Release: 6/12/2003 Rig Number: 14 Spud Date: 5/14/2003 End: 5/19/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/18/2003 00:00 - 01 :00 1.00 DRILL P INT1 on btm 2400 - off btm 2200 - PU 166K - SO 95K - ROT 122K 01 :00 - 03:00 2.00 CASE P INT1 Circulate hole clean for short trip - 3 X BU - GPM 400 - RPM 120 - PP 2250 03:00 - 05:30 2.50 CASE P INT1 Flow check well - Well static - Pump out to shoe 2930' - Pump rate same as drilling rate 400 GPM - Tight 5670' 30K over - Work twice no go - Slight pack off - Back ream from 5682' to 5670' ream down to 5682' - Pull without reaming to 5669' no problem - Tight 4360' 15K over - 3900' 20K over - 3770' 15K over - 3690' 15K over - Work through all spots without rotating - No problems from 3690' to 2930' - Flow check well - Well static 05:30 - 06:00 0.50 CASE P INT1 RIH from 2930 to 5944' - Hole in good shape 06:00 - 08:00 2.00 CASE P INT1 Circulate hole clean 3 x BU - GPM 400 - PP 2150 - Flow check well - Well static - Pump dry job 08:00 - 10:00 2.00 CASE P INT1 POH for E-Line logging and SWC - from 5944' to BHA to 758' - Hole in good shape 10:00 - 11 :30 1.50 CASE P INT1 BHA - Remove RA sources - Lay down MWD - Logging tools - Flush and Lay down motor 11 :30 - 12:00 0.50 CASE P INT1 Clear floor - PJSM - Rig Schlumberger 12:00 - 16:00 4.00 EVAL P INT1 RIH with MSFLlPEX Sonic log to 5942' - Logging from 5942' to 2933' - POH 16:00 - 17:00 1.00 EVAL P INT1 Change out logging tools - Lay down MSFLlPEX Sonic - Pick up SWC 17:00 - 20:00 3.00 EVAL P INT1 RIH to 5734' - Start run with core tool - 45 procussions all fired - POH - 45 bullets recovered - 44 out of 45 samples taken recovered - 20:00 - 21 :00 1.00 EVAL P INT1 Rig down Schlumberger tools / equipment - clear floor 21 :00 - 22:00 1.00 CASE P INT1 Make up BHA for clean out run 22:00 - 00:00 2.00 CASE P INT1 RIH to 2900' - Fill pipe - Continue RIH to 5944' - Hole in good shape 5/19/2003 00:00 - 01 :30 1.50 CASE P INT1 Circulate 3 X BU - gpm 400 - PP 1700 psi - 120 rpm - TQ 8K - Flow check - well static - Pump dry job 01 :30 - 03:00 1.50 CASE P INT1 POH to Run 7" casing from 5944 to 1700' - Hole in good shape 03:00 - 04:30 1.50 CASE P INT1 Lay down 11 stands of 4" dp - 5" HWT - Stand back flex DC's with stabilizers made up 04:30 - 06:00 1.50 CASE P INT1 Pull wear ring - Install test plug - Change top rams to 7" - Body test to 1500 psi - Pull test plug 06:00 - 07:00 1.00 CASE P INT1 Rig up Franks fill up tool - casing bails with 200 ton elevators - power tongs - PJSM running 7" casing 07:00 - 09:00 2.00 CASE P INT1 Run 7" to casing shoe to 2930' 09:00 - 09:30 0.50 CASE P INT1 Circulate at shoe @ 6 BPM - 400 psi 09:30 - 11 :30 2.00 CASE P INT1 Con't RIH with 7" casing - Ran 143 Joints + marker Joint of 7" 26# L-80 BTC casing - Shoe @ 5934.39' - Float Collar at 5859.33' - Top of marker 5636.77' - Ran 64 centralizers + 32 stop collars on Jts 1 # thru # 20 - Jts # 39 thru # 51 - 11 :30 - 12:00 0.50 CASE P INT1 Circulate mud for cement job - 6 BPM - 650 PSI 12:00 - 12:30 0.50 CASE P INT1 Install Howco cement head - Cementing Lines 12:30 - 13:30 1.00 CASE P INT1 Con't circulate / condition mud - GPM 250 - 440 psi - PU 180K - SO 105K 13:30 - 15:00 1.50 CEMT P INT1 Cementing - Halliburton pump 5 bbl water - Test lines to 3500 psi - Pump 15 bbls water - Pump 20 bbls 10.2 ppg Alpha spacer - Drop btm plug - Pump 59 bbls 275 sxs Class 'G' 15.6 ppg slurry cement with 3% KCL - 1 % Cal Seal - .5% LAP - pumping rate 5 BPM - 300 psi - Flush cementing lines - Drop Printed: 6/16/2003 2:06: 54 PM ( t: BP EXPLORATION Operations Summary Report Page 4 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-26 M PS-26 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/14/2003 Rig Release: 6/12/2003 Rig Number: 14 Spud Date: 5/14/2003 End: 5/19/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/19/2003 13:30 - 15:00 1.50 CEMT P INT1 top plug - Displace with 225 bbls 9.7 Brine - BPM 5 - 400 psi - Bump plug with 900 psi 15:00 - 15:30 0.50 CEMT P INT1 Check floats - Floats held - Rig down Howco cementing head -Lines 15:30 - 16:00 0.50 CASE P INT1 Drain stack - Break casing head and tubing head apart - Lift stack 16:00 - 16:30 0.50 CASE P INT1 Set casing slips with 125K - 16:30 - 17:00 0.50 CASE P INT1 Void brine from 7" casing 60' below ground level - Cut off 7" casing - Dress stub per FMC specification 17:00 - 18:00 1.00 RIGD P COMP Install pack off - Nipple up tubing spool - Test pack off to 70% of collapse @ 3800 psi for 10 minutes 18:00 - 19:30 1.50 RIGD P COMP Change top rams from 7" to 2 7/8" X 5" variables - Nipple down BOP's and stand back on stump 19:30 - 20:30 1.00 RIGD P COMP Install FMC 11" X 4 1/2" tubing hanger - Nipple up FMC 11" X 4 1/16" adapter - test pack off to 5K for 10 mins - Nipple up 4 1/16" 5K master valve with tree cap 20:30 - 21 :00 0.50 RIGD P COMP Freeze protect 9 5/8" X 7" annulus with 60 bbls of diesel with HB&R - pump rate 2 bpm @ 1000 psi 21 :00 - 22:00 1.00 RIGD P COMP Clean cellar - Secure well - Pick up rig - Change 4" saver sub on Top drive - 6/10/2003 16:00 - 17:30 1.50 MOB P COMP Skid rig floor to move position - Move rock washer 17:30 - 18:30 1.00 MOB P COMP Back rig off well 16i - Move rig over well 26i - Skid rig floor to drlg position 18:30 - 19:00 0.50 MOB P COMP Make up choke - Pump - Service lines - Accept rig @ 19:00 hrs 6/10/2003 19:00 - 20:00 1.00 RIGU P COMP Make up adapter flange to tree - Nipple down tree - Pull hanger 20:00 - 20:30 0.50 RIGU P COMP Dummy run with tubing hangers - measure RKB - RKB to GL 33.62 - RKB to ULD 29.83 - RKB to LLD 32.06 20:30 - 21 :30 1.00 RIGU P COMP Nipple up BOPs 21 :30 - 22:30 1.00 RIGU P COMP Fill hole - 60' of void area with 9.7 Brine - Rig up test equipment 22:30 - 00:00 1.50 RIGU P COMP Test BOPs - 250 low - 3500 high - 5 mins each test -Test Annular - TIW - IBOP - Blowout stack with air - Line up Dual Rams to test 6/11/2003 00:00 - 02:00 2.00 RIGU P COMP Con't Test BOPs - Test Top Dual Rams - Choke manifold - Second TIW - IBOP to 250 low 3500 high for 5 mins each test - Preform Accumulator test - Witness of BOP test waived by Chuck Scheve with AOGCC - Pull Dual Test joint - Close Blind rams test to 250 low 3500 psi high for 5 mins each test - Pull test plug - Fill stack with 9.7 Brine - 02:00 - 02:30 0.50 RIGU P COMP Close Blinds - test 7" casing to 3500 psi for 30 mins - ok - PJSM - (Rig up Schlumberger E-line equipment - Make up guns - Arm system) - Running safe fire system 02:30 - 08:30 6.00 PERF P COMP RIH with Schlumberger guns - 3.375" HSD - 3406 Powerjet - HMX - 6 shotlft - 60 degree phase - To perforate bottom perfs @ 5730' to 5760' - Correlate guns on depth with CCLlGR - Perforate 1 st run 5730' to 5760' - Pull 1 00' up - Stop monitor well - well lost .4 bbl in 10 mins - POH with guns - All shots fired - Change guns - RIH with 2nd run - Correlate 2nd shot from 5684' to 5694' - Perforate from 5684' to 5694' - Pull up 100' monitor well - POH with 2nd run - All shots fired - Change Guns - RIH with 3rd run - Correlate 3rd shot from 5654 to 5674 - Perforate from 5654' to 5674' - Pull up 100' monitor well - POH with 3rd run - All shots fired - Run #4 RIH with gauge ring Printed: 6/16/2003 2:06:54 PM .( BP EXPLORATION Operations Summary Report Page 5 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 6/11/2003 6/12/2003 MPS-26 MPS-26 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/14/2003 Rig Release: 6/12/2003 Rig Number: 14 Spud Date: 5/14/2003 End: 5/19/2003 From - To Hours Task Code NPT Phase Description of Operations 02:30 - 08:30 6.00 PERF P COMP / junk basket to 5720' - POH with gauge ring / junk basket - Rig down Schlumberger tools 08:30 - 09:00 0.50 RUNCO~ COMP PJSM to run 2 3/8" Dual completion - Rig up Completion tools 09:00 - 09:30 0.50 RUNCO~ COMP Make up completion tail pipe and packers 09:30 - 12:00 2.50 RUNCO~ COMP Running Dual Completion to 2600' - 2 3/8" IBT L-80 4.6# Tubing 12:00 - 12:30 0.50 RUNCO~ COMP Rig Service 12:30 - 16:30 4.00 RUNCO~ COMP Con't running 2 3/8" Dual Completion from 2600' to 5690' - 2 3/8" L-80 IBT 4.6# Tubing 16:30 - 17:00 0.50 RUNCO~ COMP Rig up Schlumberger E-Line for correlation packer setting depth 17:00 - 19:00 2.00 RUNCO~ COMP Run correlation on E-Line - Rig down Schlumberger tools 19:00 - 20:00 1.00 RUNCO~ COMP Space out - Make up hangers - Install TWC - Land Tubing - PU 92K - SO 72K - Blocks 50K 20:00 - 21 :00 1.00 RUNCO~ COMP Torque up Lock down screws - Test TWC to 1000 psi - Rig down Dual completion equipment 21 :00 - 22:00 1.00 RUNCO~ COMP PJSM - Nipple down BOP's 22:00 - 23:30 1.50 RUNCO~ COMP Nipple up Dual Completion tree - test adapter flange to 5K for 10 mins - Test tree (both sides) to 5K for 10 mins 23:30 - 00:00 0.50 RUNCO~ COMP Rig up lines to circulate - set packers - test tubing / packers 00:00 - 01 :00 1.00 RUNCO~ COMP Pull TWC's 01 :00 - 02:30 1.50 RUNCO~ COMP Pump 200 bbls 9.7 Brine treated with corexit down annulus followed by 58 bbls diesel for freeze protection - 3 bpm @ 380 psi 02:30 - 04:30 2.00 RUNCO~ COMP Drop ball on long string - Chase ball with 9.2 brine with rig pump - 4 spm @! 1100 psi - Pumped 38.4 bbls to get ball on seat - Set packer with 2000 psi rig pump - Bleed off pressure - Tie in HB&R - Test Lines to 4200 psi - Pressure up to 3000 psi on packer - Ball sheared out - Pressure dropped from 3000 psi to 600 - Attempt to pressure up 800 psi pumping away - shut down 04:30 - 05:30 1.00 RUNCO~ COMP Test annulus to 2000 psi - for 30 min - good test - bleed off psi 05:30 - 07:00 1.50 RUNCO~ COMP Dropped 29/32" ball on string and pumped down with 9.2 ppg brine. No flow on annulus or long string. Displaced ball at 1.5 bpm at 1500 psi then slowed rate to 1 bpm at 900 psi before bumping ball on seat. Pressured up to 3000 psi for 30 minutes on chart. Good test. Sheared RHC plug with 3900 psi. 07:00 - 08:00 1.00 RUNCO~ COMP Dry rod in BPV in upper and lower string. Break down lines. Removed extra valve from annulus. Secure tree. RELEASED RIG AT 0800 HRS 6-12-2003. Printed: 6/16/2003 2:06: 54 PM Legal Name: Common Name: TesfDate 5/17/2003 MPS-26 MPS-26 Te!;fTYþe FIT ""~~tPØp~l1(l'M[) 2,961.0 (ft) BPEXPLORATION L..eêll<..ºffT~$t..5ul11mary T9$tpepth(TVD) 2,529.0 (ft) AMW 9.00 (ppg) Surface Pressure Leak Off Pressure (BHP) 340 (psi) 1,522 (psi) Page 1 of '1 - EMW 11.59 (ppg) .~"3,. ~....., Printed: 611612003 2:06:47 PM 28-May-03 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-26 Gyro Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD (if applicable) 0.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager :)..() B -D l.o , RECEIVED Attachment(s) JUN 0 2 2003 AJaaka Oit & Gas Cons. CommieeiÐn AndIorage ~L4-- 0· ~q Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-26 Gyro Job No. AKF00002435668, Surveyed: 18 May, 2003 Survey Report 27 May, 2003 Your Ref: API 500292315000 Surface Coordinates: 5999947.48 N, 565714.45 E (70° 24' 37.0833" N, 149027' 53.6615" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999947.48 N, 65714.45 E (Grid) Surface Coordinates relative to Structure: 21.97 S, 630.77 W (True) Kelly Bushing: 73.20ft above Mean Sea Level Elevation relative to Project V Reference: 73.20ft Elevation relative to Structure: 73.20ft spef"""1""'Y-!5UI! DRILL.ING SERVICES A Halliburton Company DEFINIT\VE < -. Survey Ref: svy1181 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 Gyro Your Ref: AP/500292315000 Job No. AKF00002435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -73.20 0.00 0.00 N 0.00 E 5999947.48 N 565714.45 E 0.00 Tolerable Gyro 115.00 0.600 187.000 41.80 115.00 0.60 S 0.07W 5999946.88 N 565714.38 E 0.522 0.42 235.86 0.740 164.540 162.65 235.85 1.98 S 0.06E 5999945.50 N 565714.52 E 0.244 1.13 305.73 1.350 173.130 232.51 305.71 3.23 S 0.28 E 5999944.25 N 565714.75 E 0.899 1.71 368.00 1.950 174.000 294.75 367.95 5.01 S 0.47 E 5999942.4 7 N 565714.97 E 0.964 2.61 BPXA - All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 233.360° (True). Magnetic Declination at Surface is 25.503°(14-May-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 368.00ft., . The Bottom Hole Displacement is 5.03ft., in the Direction of 174.589° (True). Survey too/program for MPS-26 Gvro From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) ~ 0.00 0.00 368.00 367.95 Tolerable Gyro --~----~-------- 27 May, 2003 - 16:14 Page 2 of 2 DrillQuest 3.03.02.005 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ( 28-May-03 Re: Distribution of Survey Data for Well MPS-26 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,944.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ;¿D3-Dlol RECEIVED JUN 02 2003 AJaIka on & Gu (;;ooij. ~ w= 0. ~ Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-26 Job No. AKZZ0002435668, Surveyed: 18 May, 2003 Survey Report 27 May, 2003 Your Ref: API 500292315000 Surface Coordinates: 5999947.48 N, 565714.45 E (70024' 37.0833" N, 149027'53.6615" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999947.48 N, 65714.45 E (Grid) Surface Coordinates relative to Structure: 21.97 S, 630.77 W (True) Kelly Bushing: 73.20ft above Mean Sea Level Elevation relative to Project V Reference: 73.20ft Elevation relative to Structure: 73.20ft s,.,..........,y-suFl DRILLING SERVices A Halliburton Company DEFINITIVE Survey Ref: svy1210 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 Your Ref: APlSOO29231S000 Job No. AKZZOO02435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) /NC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 368.00 1.950 174.000 294.75 367.95 5.01 S 0.47 E 5999942.47 N 565714.97 E 2.61 AK-6 BP IFR-AK 483.85 2.960 181.780 410.49 483.69 9.968 0.59 E 5999937.52 N 565715.13 E 0.916 5.47 573.96 4.470 192.210 500.41 573.61 15.728 0.23W 5999931.76 N 565714.36 E 1.829 9.56 665.92 6.630 202.900 591.94 665.14 24.11 S 3.05W 5999923.34 N 565711.61 E 2.594 16.84 756.53 9.330 206.860 681.66 754.86 35.49 8 8.41 W 5999911.92 N 565706.36 E 3.039 27.92 853.22 11.740 212.480 776.72 849.92 50.78 8 17.23 W 5999896.55 N 565697.67 E 2.707 44.13 949.50 15.130 212.670 870.35 943.55 69.63 8 29.28 W 5999877.60 N 565685.79 E 3.521 65.04 1045.98 19.510 209.560 962.44 1035.64 94.25 8 44.03 W 5999852.85 N 565671.25 E 4.639 91.58 1139.67 20.830 209.180 1050.38 1123.58 122.408 59.87 W 5999824.55 N 565655.66 E 1.416 121.09 1235.92 22.310 210.670 1139.89 1213.09 153.06 S 77.53 W 5999793.74 N 565638.27 E 1.639 153.56 1332.24 25.560 212.240 1227.91 1301.11 186.378 97.95 W 5999760.25 N 565618.14 E 3.438 189.82 1427.95 29.560 213.290 1312.75 1385.95 223.58 8 121.93 W 5999722.83 N 565594.49 E 4.210 231.27 1523.03 29.240 214.910 1395.58 1468.78 262.23 S 148.10 W 5999683.95 N 565568.67 E 0.902 275.33 1619.33 30.060 214.710 1479.27 1552.47 301.35 8 175.29 W 5999644.60 N 565541.82 E 0.858 320.49 1713.46 28.600 215.600 1561.33 1634.53 339.05 S 201.83 W 5999606.67 N 565515.61 E 1.619 364.29 1809.56 28.450 215.990 1645.77 1718.97 376.27 8 228.67 W 5999569.21 N 565489.10 E 0.249 408.04 1905.95 29.780 221.530 1729.99 1803.19 412.78 S 258.04 W 5999532.45 N 565460.05 E 3.117 453.39 2001.95 29.840 222.320 1813.29 1886.49 448.28 8 289.93 W - 5999496.66 N 565428.48 E 0.414 500.17 2097.21 33.190 224.540 1894.49 1967.69 484.40 8 324.18 W 5999460.24 N 565394.54 E 3.721 549.21 2191.89 36.180 227.130 1972.34 2045.54 521.908 362.85 W 5999422.41 N 565356.20 E 3.520 602.61 2288.42 40.500 229.600 2048.04 2121.24 561.62 S 407.63 W 5999382.30 N 565311.78 E 4.748 662.25 2384.46 45.280 232.430 2118.39 2191.59 602.66 8 458.46 W 5999340.81 N 565261.31 E 5.365 727.53 ~ 2479.10 49.000 234.240 2182.76 2255.96 644.05 S 514.11W 5999298.93 N 565206.03 E 4.173 796.88 2577.57 51.390 235.150 2245.79 2318.99 687.768 575.85 W 5999254.68 N 565144.68 E 2.529 872.50 2672.75 54.150 236.560 2303.37 2376.57 730.27 8 638.57 W 5999211.62 N 565082.33 E 3.130 948.20 2767.75 54.120 236.610 2359.03 2432.23 772.67 8 702.83 W 5999168.65 N 565018.45 E 0.053 1025.07 2864.11 54.270 236.630 2415.41 2488.61 815.67 8 768.09 W 5999125.09 N 564953.57 E 0.157 1103.09 2979.98 54.630 237.620 2482.77 2555.97 866.84 8 847.26 W 5999073.22 N 564874.85 E 0.761 1197.16 3076.71 54.290 236.950 2539.00 2612.20 909.388 913.48 W 5999030.10 N 564809.00 E 0.664 1275.68 3172.96 54.120 237.640 2595.30 2668.50 951.56 S 979.18 W 5998987.34 N 564743.68 E 0.608 1353.57 3268.72 54.360 237.300 2651.26 2724.46 993.34 8 1044.69 W 5998944.98 N 564678.54 E 0.382 1431.07 3365.30 54.250 237.900 2707.61 2780.81 1035.37 8 -1110.92 W 5998902.37 N 564612.69 E 0.517 1509.30 3460.01 54.430 237.440 2762.82 2836.02 1076.53 8 1175.94 W 5998860.65 N 564548.03 E 0.438 1586.03 3557.27 54.350 237.860 2819.46 2892.66 1118.84 S 1242.74 W 5998817.75 N 564481.60 E 0.361 1664.88 3653.24 54.920 237.610 2875.00 2948.20 1160.628 1308.91 W 5998775.39 N 564415.80 E 0.631 1742.91 ----------------- --_.------------ 27 May, 2003 - 16:14 Page 20f4 DrillQtJP-st 3.03.02.005 DrillQuest 3.03.02.005 Page 30f4 27 May, 2003 - 16:14 ------------ ------------ -~--- Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 Your Ref: AP/S00292315000 Job No. AKZZOO02435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3746.03 54.970 237.550 2928.30 3001.50 1201.34 S 1373.03 W 5998734.11 N 564352.04 E 0.076 1818.66 3840.92 55.230 237.490 2982.59 3055.79 1243.13 S 1438.68 W 5998691.74 N 564286.76 E 0.279 1896.28 3937.19 55.500 238.400 3037.30 3110.50 1285.17 S 1505.82 W 5998649.11 N 564220.00 E 0.827 1975.24 4033.85 55.300 237.710 3092.19 3165.39 1327.26 S 1573.33 W 5998606.42 N 564152.86 E 0.623 2054.53 4130.35 55.140 238.580 3147.24 3220.44 1369.10 S 1640.65 W 5998564.00 N 564085.91 E 0.759 2133.52 4226.48 55.110 238.460 3202.20 3275.40 1410.28 S 1707.91 W 5998522.23 N 564019.01 E 0.107 2212.06 4323.06 54.730 238.530 3257.71 3330.91 1451.58 S 1775.30 W 5998480.33 N 563951.99 E 0.398 2290.78 4416.18 54.960 238.070 3311.33 3384.53 1491.59 S 1840.07 W 5998439.76 N 563887.57 E 0.473 2366.63 4512.18 54.980 237.780 3366.43 3439.63 1533.33 S 1906.68 W 5998397.43 N 563821.33 E 0.248 2444.99 4606.55 54.540 238.030 3420.88 3494.08 1574.28 S 1971.98 W 5998355.91 N 563756.40 E 0.514 2521.83 4703.35 54.440 238.170 3477.11 3550.31 1615.92 S 2038.87 W 5998313.68 N 563689.87 E 0.157 2600.35 4799.70 54.640 238.510 3533.01 3606.21 1657.12 S 2105.67 W 5998271.90 N 563623.44 E 0.355 2678.54 4893.83 54.440 238.660 3587.61 3660.81 1697.08 S 2171.11 W 5998231.36 N 563558.36 E 0.249 2754.89 4990.94 54.290 238.140 3644.19 3717.39 1738.43 S 2238.33 W 5998189.42 N 563491.50 E 0.462 2833.51 5087.52 54.030 238.190 3700.74 3773.94 1779.73 S 2304.84 W 5998147.54 N 563425.35 E 0.272 2911.53 5183.53 54.020 238.220 3757.14 3830.34 1820.67 S 2370.88 W 5998106.02 N 563359.68 E 0.027 2988.95 5278.17 53.310 239.070 3813.22 3886.42 1860.34 S 2435.98 W 5998065.78 N 563294.93 E 1.042 3064.86 5376.21 53.540 239.400 3871.64 3944.84 1900.61 S 2503.64 W 5998024.91 N 563227.63 E 0.358 3143.18 5472.69 53.370 239.490 3929.09 4002.29 1940.02 S 2570.39 W 5997984.92 N 563161.23 E 0.191 3220.25 5567.39 53.890 239.120 3985.24 4058.44 1978.94 S 2635.95 W 5997945.42 N 563096.01 E 0.633 3296.10 5663.47 54.290 239.170 4041.59 4114.79 2018.85 S 2702.76 W 5997904.92 N 563029.56 E 0.418 3373.52 5760.01 53.900 239.550 4098.21 4171.41 2058.71 S 2770.04 W 5997864.48 N 562962.63 E 0.515 3451.29 5868.46 53.670 238.910 4162.28 4235.48 2103.47 S 2845.22 W 5997819.06 N 562887.85 E 0.521 3538.33 5944.00 53.670 238.910 4207.04 4280.24 2134.89 S 2897.33 W - 5997787.18 N 562836.01 E 0.000 3598.90 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 233.360° (True). Magnetic Declination at Surface is 25.502°(14-May-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5944.00ft., The Bottom Hole Displacement is 3598.93ft., in the Direction of 233.615° (True). Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 Your Ref: AP/500292315000 Job No. AKZZ0002435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) INC. Mifne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 5944.00 4280.24 2134.89 S 2897.33 W Projected Survey Survey tool program for MPS-26 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 368.00 0.00 367.95 368.00 5944.00 367.95 Tolerable Gyro (MPS-26 Gyro) 4280.24 AK-6 BP _IFR-AK (MPS-26) -, ---.-------- 27 May, 2003 - 16:14 Page 4 0'4 DrillQuest 3.03.02.005 (' AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ;Ii '~ 28-May-03 Re: Distribution of Survey Data for Well MPS-26 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 5,944.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~o 3 - b £0 I RECEIVED JUN 0 2 2003 AlasKa 0tI & Gas Cons. CoRlf11ieeion ~~,~ Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-26 MWD ~..-=-~ Job No. AKMW0002435668, Surveyed: 18 May, 2003 Survey Report 27 May, 2003 Your Ref: AP/500292315000 Surface Coordinates: 5999947.48 N, 565714.45 E (70024' 37.0833" N, 149027' 53.6615" W) Grid. Coordinate System: NAD27 Alaska State Planes, Zone 4 ~-. Surface Coordinates relative to Project H Reference: 999947.48 N, 65714.45 E (Grid) Surface Coordinates relative to Structure: 21.97 S, 630.77 W (True) Kelly Bushing: 73.20ft above Mean Sea Level Elevation relative to Project V Reference: 73.20ft Elevation relative to Structure: 73.20ft Spe'-''-'Y-5UI! CRILLING SeRVIc:es A Halliburton Company Survey Ref: svy1211 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 MWD Your Ref: API 500292315000 Job No. AKMW0002435668. Surveyed: 18 May. 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 368.00 1.950 174.000 294.75 367.95 5.01 S 0.47 E 5999942.47 N 565714.97 E 2.61 MWD Magnetic 483.85 2.960 182.090 410.49 483.69 9.96 S 0.57 E 5999937.52 N 565715.11 E 0.920 5.49 573.96 4.470 192.550 500.41 573.61 15.71 S 0.28W 5999931.76 N 565714.31 E 1.830 9.60 665.92 6.630 203.730 591.94 665.14 24.07 S 3.19W 5999923.38 N 565711.47 E 2.616 16.93 756.53 9.330 208.400 681.66 754.86 35.33 S 8.79W 5999912.08 N 565705.97 E 3.062 28.14 ----'. 853.22 11 .740 213.320 776.72 849.92 50.44 S 17.92 W 5999896.88 N 565696.97 E 2.658 44.49 949.50 15.130 213.020 870.35 943.55 69.17 S 30.16 W 5999878.05 N 565684.90 E 3.522 65.47 1045.98 19.510 209.330 962.44 1035.64 93.78 S 44.92 W 5999853.30 N 565670.36 E 4.678 92.01 1139.67 20.830 209.050 1050.38 1123.58 121.99 S 60.67 W 5999824.96 N 565654.86 E 1.413 121.48 1235.92 22.310 210.390 1139.89 1213.09 152.71 S 78.22 W 5999794.09 N 565637.58 E 1.621 153.90 1332.24 25.560 211.770 1227.91 1301.11 186.15 S 98.42 W 5999760.47 N 565617.68 E 3.424 190.06 1427.95 29.560 213.420 1312.75 1385.95 223.43 S 122.30 W 5999722.99 N 565594.12 E 4.254 231.47 1523.03 29.240 214.260 1395.58 1468.78 262.20 S 148.29 W 5999683.99 N 565568.4 7 E 0.549 275.46 1619.33 30.060 215.160 1479.27 1552.47 301.35 S 175.42 W 5999644.59 N 565541.69 E 0.969 320.60 1713.46 28.600 215.280 1561.33 1634.53 339.02 S 202.01 W 5999606.69 N 565515.43 E 1.552 364.42 1809.56 28.450 215.760 1645.77 1718.97 376.37 S 228.67 W 5999569.11 N 565489.10 E 0.285 408.10 1905.95 29.780 221.590 1729.99 1803.19 412.92 S 257.99 W 5999532.31 N 565460.11 E 3.249 453.43 2001.95 29.840 222.660 1813.29 1886.49 448.31 S 290.00 W 5999496.64 N 565428.41 E 0.558 500.24 2097.21 33.190 225.110 1894.49 1967.69 484.15 S 324.54 W 5999460.49 N 565394.18 E 3.764 549.35 2191.89 36.180 227.760 1972.34 2045.54 521.24 S 363.60 W 5999423.06 N 565355.45 E 3.536 602.82 2288.42 40.500 229.710 2048.04 2121.24 560.68 S 408.63 W 5999383.22 N 565310.77 E 4.647 662.49 2384.46 45.280 233.070 2118.39 2191.59 601.38 S 459.73 W 5999342.08 N 565260.03 E 5.516 727.78 ~~-"'-, 2479.10 49.000 234.430 2182.76 2255.96 642.37 S 515.67 W 5999300.60 N 565204.45 E 4.069 797.13 2577.57 51.390 235.910 2245.80 2319.00 685.56 S 577.77W 5999256.87 N 565142.73 E 2.688 872.73 2672.75 54.150 237.210 2303.38 2376.58 727.30 S 641.01 W 5999214.57 N 565079.86 E 3.097 948.39 2767.75 54.120 237.120 2359.04 2432.24 769.04 S 705.70 W 5999172.26 N 565015.55 E 0.083 1025.21 2864.11 54.270 237.040 2415.41 2488.61 811.52 S 771.30 W 5999129.21 N 564950.32 E 0.170 1103.19 2979.98 54.630 237.330 2482.78 2555.98 862.60 S 850.53 W 5999077.43 N 564871.54 E 0.371 1197.25 3076.71 54.290 236.660 2539.00 2612.20 905.48 S 916.54 W 5999033.97 N 564805.92 E 0.664 1275.80 3172.96 54.120 237.340 2595.30 2668.50 948.00 S 982.01 W 5998990.88 N 564740.82 E 0.600 1353.72 3268.72 54.360 236.890 2651.26 2724.46 990.19 S 1047.26 W 5998948.12 N 564675.94 E 0.456 1431.26 3365.30 54.250 237.210 2707.61 2780.81 1032.85 S 1113.08 W 5998904.88 N 564610.50 E 0.292 1509.53 3460.01 54.430 236.680 2762.83 2836.03 1074.82 S 1177.58 W 5998862.34 N 564546.37 E 0.493 1586.33 3557.27 54.350 237.280 2819.46 2892.66 1117.91 S 1243.88 W 5998818.67 N 564480.46 E 0.508 1665.24 3653.24 54.920 237.190 2875.00 2948.20 1160.27 S 1309.69 W 5998775.74 N 564415.02 E 0.599 1743.33 --------------------- -. -.-.------------ --- 27 May, 2003 - 16:16 Page 2 of4 DríllQlIest .1.03.02.005 DrillQuest 3.03.02.005 Page 30(4 27 May, 2003 - 16:16 ~----_.- --- ----------->--- Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 MWD Your Ref: API 500292315000 Job No. AKMW0002435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 3746.03 54.970 237.160 2928.30 3001.50 1201.44 S 1373.52 W 5998734.00 N 564351.56 E 0.060 1819.11 3840.92 55.230 236.960 2982.59 3055.79 1243.76 S 1438.83 W 5998691.11 N 564286.62 E 0.324 1896.78 3937.19 55.500 238.220 3037.31 3110.51 1286.21 S 1505.70 W 5998648.07 N 564220.12 E 1.113 1975.77 4033.85 55.300 237.790 3092.19 3165.39 1328.37 S 1573.18 W 5998605.32 N 564153.02 E 0.421 2055.07 4130.35 55.140 238.670 3147.24 3220.44 1370.10 S 1640.56 W 5998563.00 N 564086.01 E 0.767 2134.04 ~ 4226.48 55.110 238.680 3202.21 3275.41 1411.10 S 1707.93 W 5998521.41 N 564019.00 E 0.032 2212.57 4323.06 54.730 238.720 3257.71 3330.91 1452.16 S 1775.46 W 5998479.75 N 563951.83 E 0.395 2291.26 4416.18 54.960 238.290 3311.33 3384.53 1491.94 S 1840.38 W 5998439.41 N 563887.26 E 0.451 2367.09 4512.18 54.980 237.880 3366.44 3439.64 1533.49 S 1907.11 W 5998397.27 N 563820.91 E 0.350 2445.43 4606.55 54.540 238.170 3420.89 3494.09 1574.31 S 1972.49 W 5998355.88 N 563755.89 E 0.530 2522.25 4703.35 54.440 238.380 3477.11 3550.31 1615.74 S 2039.51 W 5998313.85 N 563689.23 E 0.205 2600.76 4799.70 54.640 238.680 3533.01 3606.21 1656.71 S 2106.45 W 5998272.30 N 563622.66 E 0.328 2678.92 4893.83 54.440 239.000 3587.62 3660.82 1696.39 S 2172.06 W 5998232.05 N 563557.40 E 0.349 2755.24 4990.94 54.290 238.330 3644.20 3717.40 1737.43 S 2239.47 W 5998190.41 N 563490.35 E 0.582 2833.83 5087.52 54.030 238.620 3700.75 3773.95 1778.37 S 2306.21 W 5998148.89 N 563423.98 E 0.363 2911.81 5183.53 54.020 238.680 3757.14 3830.34 1818.79 S 2372.56 W 5998107.89 N 563357.98 E 0.052 2989.18 5278.17 53.310 239.710 3813.22 3886.42 1857.83 S 2438.04 W 5998068.27 N 563292.85 E 1.154 3065.02 5376.21 53.540 240.950 3871.64 3944.84 1896.81 S 2506.45 W 5998028.69 N 563224.78 E 1.042 3143.17 5472.69 53.370 240.390 3929.09 4002.29 1934.77 S 2574.03 W 5997990.13 N 563157.55 E 0.498 3220.05 5567.39 53.890 240.260 3985.25 4058.45 1972.52 S 2640.28 W 5997951.80 N 563091.63 E 0.560 3295.74 5663.47 54.290 239.660 4041.60 4114.80 2011.48 S 2707.64 W 5997912.25 N 563024.61 E 0.655 3373.04 5760.01 53.900 240.050 4098.22 4171.42 2050.75 S 2775.26 W 5997872.39 N 562957.34 E 0.520 3450.73 ~~~, 5868.46 53.670 239.590 4162.29 4235.49 2094.74 S 2850.90 W 5997827.74 N 562882.09 E 0.403 3537.68 5944.00 53.670 239.590 4207.04 4280.24 2125.54 S 2903.39 W 5997796.47 N 562829.88 E 0.000 3598.17 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 233.360° (True). Magnetic Declination at Surface is 25.502°(14-May-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 5944.00ft., The Bottom Hole Displacement is 3598.27ft., in the Direction of 233.792° (True). Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-26 MWD Your Ref: API 500292315000 Job No. AKMW0002435668, Surveyed: 18 May, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment ~"'-~"'- 5944.00 4280.24 2125.54 S 2903.39 W Projected Survey Survey tool program for MPS-26 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 368.00 0.00 367.95 368.00 5944.00 367.95 Tolerable Gyro (MPS-26 Gyro) 4280.24 MWD Magnetic (MPS-26 MWD) ~'=.. ____ -_____-0---- ___._______ 27 May, 2003 - 16:16 Page 4 of 4 DrillQllest 3.03.02.005 .~~ _~c"~ 1 4584.0 2063.1 33.7 37.5 55.4 0.68 92.9 2.64 Sd dk brn vf-fgr sslty dk stn vdor flu os 2 4586.1 1735.4 36.0 50.9 46.0 1.10 96.9 2.64 Sd dk brn vf-fgr sslty dk stn vdor flu os 3 4816.1 530.9 33.8 51.5 37.1 1.39 88.6 2.64 Sd dk brn vfgr sslty dk stn vdor flu os 4 4824.1 4560.1 40.3 53.0 35.0 1.51 88.0 2.61 Sd dk brn vf-fgr sslty dk stn vdor flu os 5 4864.0 1775.8 39.9 54.1 35.0 1.55 89.1 2.62 Sd dk brn vfgr sslty cly strk dk stn vdor flu os 6 4868.1 1809.1 41.5 42.7 42.1 1.01 84.8 2.61 Sd dk brn vfgr sslty dk stn vdor flu os 7 4874.1 1568.2 42.7 40.8 43.7 0.93 84.5 2.61 Sd dk brn vfgr sslty dk stn vdor flu os 8 4960.1 151.0 35.9 52.2 39.1 1.33 91.3 2.65 Sd dk brn vfgr slty dk stn vdor flu os 9 4981 .0 38.4 34.8 43.4 47.7 0.91 91.0 2.66 Sd dk brn vfgr vslty scly dk stn vdor flu os 10 4988.1 220.7 35.2 55.5 40.0 1.39 95.5 2.64 Sd dk brn vfgr slty dk stn vdor flu os 11 5023.1 273.2 33.4 57.7 39.4 1.46 97.1 2.63 Sd dk brn vfgr slty cly strks dk stn vdor flu os 12 5025.1 231.3 34.5 49.2 45.3 1.09 94.6 2.64 Sd dk brn vfgr slty dk stn vdor flu os 13 5048.0 102.3 35.3 50.3 43.1 1.17 93.4 2.65 Sd dk brn vfgr slty dk stn vdor flu os 14 5052.0 89.5 35.2 50.1 47.4 1.06 97.5 2.65 Sd dk brn vfgr vslty dk stn vdor flu os 15 5067.1 25.7 34.4 39.9 47.9 0.83 87.8 2.66 Sd dk brn vfgr vslty dk stn vdor flu os 16 5076.1 106.7 30.3 59.8 35.5 1.68 95.3 2.64 Sd dk brn vfgr slty cly strks dk stn vdor flu os 17 5079.0 366.4 31.0 62.5 34.5 1.81 97.0 2.63 Sd dk brn vfgr slty cly strk sk stn vdor flu os 18 5096.0 1449.7 35.2 43.6 49.1 0.89 92.7 2.60 Sd dk brn vf-fgr sslty dk stn vdor flu os 19 5105.1 181.3 32.5 49.7 45.5 1.09 95.1 2.62 Sd dk brn vf-fgr slty scly dk stn vdor flu os 20 5144.0 52.5 33.4 43.8 50.6 0.87 94.4 2.65 Sd brn vfgr vslty dk stn vdor flu os 21 5153.1 349.9 31.5 58.7 37.6 1.56 96.3 2.64 Sd dk brn vfgr slty cly strks dk stn vdor flu os 22 5155.1 411.9 33.6 53.2 40.5 1.32 93.7 2.64 Sd dk brn vfgr sslty cly incl dk stn vdor flu os 23 5185.1 147.3 32.1 49.9 47.9 1.04 97.8 2.62 Sd dk brn vfgr slty scly carb lam dk stn vdor fh os 24 5214.0 359.0 32.6 53.5 45.4 1.18 98.9 2.64 Sd dk brn vfgr slty scly dk stn vdor flu os 25 5223.9 881.9 33.8 44.7 44.0 1.02 88.8 2.62 Sd dk brn vf-fgr slty scly dk stn vdor flu os 26 5227.1 1468.1 33.6 41.5 56.5 0.73 98.1 2.57 Sd dk brn vfgr sslty carb cht incl dk stn vdor fh os 27 5246.2 1766.2 35.5 48.3 43.9 1.10 92.1 2.61 Sd dk brn vf-fgr sslty dk stn vdor flu os 28 5260.1 572.8 34.3 49.8 47.4 1.05 97.2 2.63 Sd dk brn vf-fgr slty scly dk stn vdor flu os 29 5266.0 394.0 32.7 52.5 46.3 1.13 98.8 2.63 Sd dk brn vf-fgr slty scly dk stn vdor flu os 30 5276.1 396.5 32.2 53.1 45.9 1.16 99.1 2.63 Sd dk brn vf-fgr slty scly dk stn vdor flu DS 31 5297.2 723.7 30.9 57.7 42.1 1.37 99.8 2.69 Sd dk brn vfgr sslty scly calc cht incl dk stn vd os 32 5302.0 4.8 25.7 12.8 81.7 0.16 94.5 2.68 Sd brn-gry vfgr vslty vcly dstrk stn vdor flu os Method -S~J!1p1!~rtE9~B!-It---}~'-lS!!m~~~r~~'.~i!f~\~~~=~;¡~~~~!tir~tiøJi$.n@t~~¡t~2~:t~~ìl~~~~~-r.;G.-:t.'tiJrE'=:-D,sCription t ~ ~ ___~n___ -~------~---~--~ ~ ~ - ~ - -------------------------- ----------------------- -------------- ------- - -- - - -- - - ----- . - ... ----- - --- --- --- - - - - ---- - -- - - -- -- - --- -- - --- - -- - _ C~ _::-0_-_-___ 0 __ _ -:.__ -_ _ -~_-==----, __-_- ~".~-=--~=~--_ :__ ~ ~-~----='_~-~_- -_~_ ----=c--o~ ~------=o=--'- -=-= - _~-"=",- -~=__ -:----'-----"------= -_----"-----_ __~_~- _ _. =-__ __.=_- o--~. _:--_-. _~--_ ~_~ -_o-__~_.. - c-/:NcQ.__ -~~ ~--jG~¡~~-~~~·-1~\rtJ~/i!fkiiI~~;~~~~-t;fA}_im rD1n~~1!~ f~¥l.~: ~.c-~I'~g~~Æ-tL~1~ty- -- SIDEWALL CORE ANALYSIS RESULTS CL File Number: 57111-103054' Location: API Number: . BP Alaska - MPS 261 .... .... .. .." Milne Point CøI1! lab ~' Date Samples Received : 6/4/2003 Seating Pressure (psig) : (Depth - 100) Confining Pressure (psig) : 250 Methods DS : DS - Dean Stark, toluene extraction, helium porosity, measured perm., measured grain density. DS/B : DS/S - Dean Stark, toluene extraction, Hg bulk, calc. porosity, measured grain density, estimated perm. NAR : No Sample Recovered 51.4 0.94 99.5 2.67 Sd brn vfgr vslty cly dk stn vdor flu No Sample Recovered 51.2 0.95 99.9 2.64 Sd brn vfgr slty cly dk stn vdor flu 44.3 1.25 99.7 2.69 Sd brn vfgr slty scly dk stn vdor flu 46.7 1.08 97.4 2.67 Sd brn vfgr slty scly dk stn vdor flu 65.5 0.46 95.6 2.65 Sd dk vf-fgr slty dk stn vdor flu 73.0 0.21 88.3 2.76 Sd brn vfgr vslty cly pyr incl m stn vdor flu 68.3 0.35 92.3 2.69 Sd It brn vfgr vslty scly m stn vdor flu 61.6 0.49 91.7 2.66 Sd brn vfgr vslty dk stn vdor flu 64.7 0.43 92.5 2.70 Sd brn vfgr vslty cly dk stn vdor flu 73.6 0.27 93.5 2.71 Sd tan vfgr vslty cly calc m stn dor flu 68.1 0.35 91.8 2.69 Sd It brn vfgr vslty cly m stn dor flu - - --- --~- ------- -- - - - --- - ------ -- - --- ---..... _ -..~.-.--..-.. ---. ----......~...... ...... .. ---..- ~..- --.~...-.- - ... . ... ....... -- -- __. --.-..- -Sattll·jtiQi1s--~Ü-cI~2:: i~g"tol-at~$Lc ~f?~~tªjn~~i,:a~,§Eij>t!gij~:'~~I~1jz~~r5 -¿ ~.~_~c:o- - ~ ~~_= -__ ~-);~~Mitfj:id;i :li~W~er4~o~_:m-~_-:~~1~~¡it~ ~~~W~~i i ~~-y;~~~~_~-~-~~~~~-~___~ ~~ c_=_~;_c/=-~~ c~:~n =~n~~- - -cx=~-~=- - OS NAR OS OS ~ OS OS OS OS OS os OS os Sample Depth Perm. Porosity No. Kair __on It md % %~ 33 5307.1 99.0 32.5 48.1 5338.0 34 5341 .0 129.0 32.5 48.7 35 5356.0 174.5 33.5 55.4 36 5358.1 120.5 34.5 50.7 37 5454.1 328.3 33.1 30.2 38 5512.0 10.8 28.1 15.3 39 5521.1 11.5 30.3 24.1 40 5662.0 52.0 32.9 30.0 41 5676.9 19.4 32.4 27.7 42 5726.2 11.8 30.9 19.9 43 5733.1 17.0 32.5 23.7 SIDEWALL CORE ANALYSIS RESULTS CL File Number: 57111-103054 Location: API Number: .. BP Alaska MPS 261 . Milne Point Cœe Lab · Ct:we Lab Sample Depth 4584.0 4586.1 4816.1 4824.1 4864.0 4868.1 4874.1 4960,1 4981.0 4988.1 5023.1 5025.1 5048.0 5052.0 BP Alaska MPS 261 Milne Point Gravel Component Percentages Sand vcgr cgr I mgr I fgr vfgr 0.00 Sieve and Laser Particle Size Analysis (Weight °k) C.L. File #: 57111-103054 - - - - -- - -- -- - - --- - - ___ - - - _. __ __n ___ _ _ _ '~-;¥~~Sj~~~;f'~mC!:Dt!f!~ m _ - - _ -=-=----~~SO:ft!I!SfStäíistiC§ (EOIk) --------- - - ---------- - - - - -------- ----- --- --- ----- - - --- ---. - - ----- 0.25 17.56 56.01 9.56 4.19 9.31 3.12 0.728 0.610 0.539 0.473 0.402 0.363 0.242 0.122 0.036 0.008 ~ ~ ~ ~ ~ ~ ~ ~ . . 0.00 0.00 1.57 62.25 15.62 5.25 11.17 4.14 0.469 0.430 0.399 0.367 0.323 0.296 0.185 0.073 0.020 0.005 mgr mgr mgr mgr mgr mgr fgr vfgr silt silt 0.00 0.00 2.21 37.92 22.68 13.56 18.86 4.78 0.469 0.414 0.369 0.320 0.252 0.206 0.070 0.031 0.012 0.004 mgr mgr mgr mgr mgr fgr vfgr silt silt silt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.25 44.66 36.35 6.04 0.15 4.19 56.57 14.26 18.26 7.61 3.09 0.457 0.401 0.361 0.320 0.271 0.244 0.174 0.126 fgr fgr fgr 0.056 0.009 silt silt 0.00 4.74 61.34 15.50 13.86 mgr mgr mgr mgr mgr 0.00 6.57 0.249 0.228 0.212 0.193 0.168 fgr 0.152 0.066 0.021 0.008 0.003 silt clay fgr fgr fgr fgr fgr vfgr silt 4.56 0.250 0.228 mgr fgr 0.211 fgr 0.194 0.172 fgr fgr 0.158 fgr 0.103 vfgr 0.049 0.016 0.004 silt silt 4.89 59.25 15.55 15.56 4.75 mgr 0.00 0.00 6.86 40.94 40.00 12.20 0.140 0.125 0.113 0.099 0.078 0.059 0.011 fgr fgr vfgr vfgr vfgr silt silt 0.006 0.003 0.001 silt clay clay 0.251 0.229 0.211 fgr fgr 0.193 fgr 0.170 fgr 0.156 0.094 fgr vfgr 0.037 0.012 0.004 0.00 0.00 9.17 42.00 39.18 9.65 0.118 0.104 0.083 0.066 0.016 0.008 0.004 0.002 vfgr vfgr vfgr vfgr silt silt silt clay 0.00 0.00 3.10 32.23 53.45 11.22 0.123 0.106 0.092 0.078 0.058 0.042 0.011 vfgr vfgr vfgr vfgr silt silt silt 0.006 0.003 0.001 silt clay clay 0.22 3.85 20.29 36.46 31.37 silt silt 0.147 0.131 fgr fgr 7.81 0.236 0.186 fgr fgr 0.157 0.132 0.103 0.086 0.027 0.011 fgr fgr vfgr vfgr silt silt 0.005 0.002 silt clay 0.00 0.77 15.44 31.25 19.90 26.39 6.25 0.361 0.298 0.253 0.208 0.155 0.126 0.037 0.015 0.007 0.003 mgr mgr mgr fgr fgr fgr silt silt silt clay 0.00 0.00 0.31 7.14 29.10 29.38 26.42 7.65 0.280 0.230 0.196 0.163 0.126 0.105 0.030 0.012 0.006 0.002 mgr fgr silt 0.00 0.00 0.00 fgr fgr fgr vfgr silt silt 0.00 0.00 0.00 3.51 36.72 47.56 12.21 0.127 0.112 0.100 0.085 0.065 0.048 0.011 0.006 0.003 0.001 silt silt 0.156 fgr 0.066 vfgr 0.042 silt 0.086 vfgr 0.126 fgr clay 0.105 vfgr 0.059 silt 0.048 0.363 mgr 0.296 mgr 0.206 fgr 0.244 fgr 0.152 fgr 0.158 fgr 0.107 vfgr 0.039 silt 0.029 silt 0.053 silt 0.078 vfgr 0.062 silt 0.033 silt 0.030 0.288 mgr 0.205 fgr 0.133 fgr 0.223 fgr 0.087 vfgr 0.118 vfgr 1.411 Poor 1.529 Poor 1.959 Poor 1.966 Poor 1.983 Poor 2.078 v. Poor 2.082 v. Poor 2.114 v. Poor 2.048 1.527 Poor 0.580 str. fine 1.607 Poor 0.721 str. fine 1.934 Poor 0.593 str. fine 1.225 Poor 0.463 str. fine 1.835 Poor 0.749 str. fine 0.691 str. fine 0.712 str. fine 0.611 str. fine 0.473 str. fine 0.558 str. fine 0.534 str. fine 0.576 str. fine 0.597 str. fine 0.532 2.772 v. lepto. - 2.714 v. lepto. 1.282 lepokurtic 2.595 v. lepto. 1.728 v.lepto. 2.630 v.lepto. 2.337 v.lepto. 0.976 mesokurtic '"-"' 0.950 mesokurtic 1.205 lepokurtic 1.142 lepokurtic 1.173 lepokurtic 0.870 platykurtic 0.920 A Core LaI:Ï Sample Depth Gravel 5067.1 BP Alaska MPS 261 Milne Point C.L. File #: 57111·103054 Sieve and Laser Particle Size Analysis (Weight %) ~-- _7 _~__ _-0 _ _ _ _---.- _ __._ Component Percentages -~'~::;~Rjm'ntiJiS~~~,=-~~ - .~=_.. ~__.-_~.~__ _.' ._ ?~:t~ç1~piij-~~tjti§tiCi~IEOJJt~~__- Sand Fil18S·cc- o-£¿.~3-i'fJçre:m_~~ID=am\~-~-Q'~~1~gicfz~¥~"81~U~.ki1ß &~l'B E~irtf~~~ ~iiW1ie~;~!JrtO$t$~ vcgr I cgr I mgr I fgr I vfgr silt-I-Cclay~_c~ '§~l~'Ií'--~-ID1~~;t2~r;t~~4t4~{--c~~,qt~-~iMI~t-~;~~U;mE: iro~j} ~{m~.p~f ~>,,~~5J--c. fgr vfgr vfgr vfgr vfgr silt silt silt clay clay silt silt V. Poor str. fine mesokurtic - 0.00 0.00 0.00 0.00 3.68 38.31 45.78 12.23 0.128 0.113 0.101 0.087 0.067 0.051 0.011 0.006 0.003 0.001 0.051 0.030 2.060 0.561 0.918 -- ) . On! løtÌ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 4584.0 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 ~ 0 ..,j J: 21.0 "#. c:Ð 60 ~ ~ c: .~ CI) ;::, ftš tr -; 40 14.0 J: E ;::, (,) 20 7.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 Partlch~ SlzQ' QI$tHbutiori 1'1 1/,1':": 1,,:1:' ;,' ': I' '"I; I""'~,!"I ':,:.-:: i rus Meshl' .,': D~~~~~,r,I""'r~~J,I":,¡ :''''I'r''~hl'':'':'' 'JI~·~~~~'~~[tm':~ II' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.25 0.25 . ····..·····..·..········2·Ö········..·Ö:Ö331·······ö:ä4ÖÖ·....... ·Ö:25····-·..··Ö·:66··········Ö:SÖ····· Coarse 25 0.0280 0.7100 0.50 3.46 4.36 Sand 30 0.0232 0.5900 0.75 4.57 8.93 35 0.0197 0.5000 1.00 8.88 17.81 ··············..·······..4·Ö· ·········ö:ö1"6s······Ö:42ÖÖ·········1·:25····-··..14·.7'1···..····32:51"..· Medium 45 0.0138 0.3500 1.50 17.68 50.19 Sand 50 0.0118 0.3000 1.75 14.75 64.94 60 0.0098 0.2500 2.00 8.88 73.82 ........................ ·fö·..·····..Ö :ÖÖŠ3..·..·Ö ::¿·1ÖÖ·..·.... ·2:25.... -... ..2.6f3·....··· 76:47"'·' Fine 80 0.0070 0.1770 2.50 3.29 79.76 Sand 100 0.0059 0.1490 2.75 2.01 81.78 120 0.0049 0.1250 3.00 1.61 83.38 ............ ·········..'14·ö....······Ö:ÖÖ41..·....ö:·1ö5ö······ ···3:25····_·..·'1·.'2·6·······..·84:64..·· v. Fine 170 0.0035 0.0880 3.50 1.09 85.73 Sand 200 0.0029 0.0740 3.75 1.04 86.77 230 0.0025 0.0625 4.00 0.80 87.57 270 0.0021 0.0530 4.25 0.81 88.39 325 0.0017 0.0440 4.50 0.38 88.76 Silt 400 0.0015 0.0370 4.75 0.73 89.50 450 0.0012 0.0310 5.00 0.72 90.22 500 0.0010 0.0250 5.25 0.95 91.17 635 0.0008 0.0200 5.50 0.66 91.83 0.0006 0.0156 6.00 1.07 92.90 0.0003 0.0078 7.00 2.30 95.20 0.0002 0.0039 8.00 1.67 96.88 0.0001 0.0020 9.00 1.22 98.10 0.0000 0.0010 10.00 1.04 99.14 Clay 0.0000 0.0005 11.00 0.68 99.82 0.0000 0.0002 12.00 0.18 100.00 0.0000 0.0001 13.00 0.00 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 "'):,1. "..:,. ",1.,.",.,,1.'::.'.: .. ,:::'."'.:'.!.I'..$.·..o..:..':'.',tt...·.lln, A. '. is, t~t. ,I,~t, lei. ....,!~F:þ. ~k. ). '. ¡,.I",.:,.II.'.:,','..!.,.I. .,".!".::"'. ",:,:1',':,,'::11'1" 1'1,,1""""'1'1 "1',1, I ,'" '1''1'" 1'1,1111",1, I 'I: ,,,",",' "1>11, :1"1" 1','1. '" I,:, "ll\'åram'ète~ ',I I. ,II :t~.ä (' ',1 "jnm~" "',I' II,' !Folk'l'" Median (In) (mm) Medium sand sized o 01J3 O.ùIJ3 001-13 0.3628 0.3628 0.3628 Mean,¡i ',I, II '¡,Medlumsårid,slied',¡ (In) 0.01407 0.01011 0.01134 (mm) 0.3575 0.2568 0.2881 Sol'tllig, Skewness Kul'tosls I Poor, , 0.477 1.527 1.399 Strongly fine skewed 0.932 2.124 0.580 Very leptokul'tic 0.202 2.063 2.772 Component Percentages Gravel I Sand I Slit I Clay I Silt + Clay 0.00 87.57 9.31 3.12 12.43 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] [phi] 0.02865 0.72765 0.02401 0.60985 0.02121 0.53878 0.01863 0.47318 0.01584 0.40233 0.01429 0.36284 0.00952 0.24182 0.00482 0.12238 0.00142 0.03598 0.00031 0.00777 0.46 0.71 0.89 1.08 1.31 1.46 2.05 3.03 4.80 7.01 ) .. Cøte Lab BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 4586.1 Sieve and Laser Particle Size Analvsis 100 40.0 80 32.0 ~ 0 ::ë 24.0 ~ C) 60 ~ ~ c ~ ( ) =' :¡:¡ cr ca 40 160 e -; E . LL. =' (.) 20 8.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 , i ' 'ÞåttlcléSi;¡!el¡ølstrlbOtlOI' '~"~¡' I ,.1'1, "i",' 1.';',11,1,"", / " ': ,I ":';'" ¡I.",'.,.. : I,' .... D 'a~éter, .,' ¡i",I,"'I¡' \,.., .i"'I".'I,I',', .' i'" 'WØ Aht'~~'i:,¡" " :"""', hJS'Me$hli ',,' rirdl I'" ,'.":.rmml", ,~,'.,:J"l'i:,II'I:';tlhçl!i":,,,'III, 'r(1urri:] Ii 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 . ................. ·······2Ö····· ······Ö."Ö331·····..ö:ä4öö···..····Ö:25····-·..··Ö:ö·ö········..·Ö:ÖÖ·..·· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 1.57 1.57 ....................... ..¡Ö··..··...· Ö." Ö1 f35·..··· Ö :42ÖÖ..·.... "1': 25'" .-... ..:;:5:;···..··.. '9: ·14····· Medium 45 0.0138 0.3500 1.50 17.42 26.56 Sand 50 0.0118 0.3000 1.75 21.28 47.84 60 0.0098 0.2500 2.00 15.98 63.82 ............ ·..··········:;ö·········..Ö."ÖÖä3······Ö:21ÖÖ..··....·2:25·..·_····4·:9·5·········68:77···· Fine 80 0.0070 0.1770 2.50 5.57 74.34 Sand 100 0.0059 0.1490 2.75 2.91 77.25 120 0.0049 0.1250 3.00 2.19 79.44 ....................... ·1·4·Ö········ ·Ö."ÖÖ¡1···..·· Ö: ·1Ö5Ö·..·.... ·3:25.... -..···1".'78··........ 81 :22..·· V. Fine 170 0.0035 0.0880 3.50 1.23 82.45 Sand 200 0.0029 0.0740 3.75 1.21 83.66 230 0.0025 0.0625 4.00 1.03 84.69 270 0.0021 0.0530 4.25 1.03 85.72 325 0.0017 0.0440 4.50 0.45 86.17 Silt 400 0.0015 0.0370 4.75 0.75 86.92 450 0.0012 0.0310 5.00 0.92 87.84 500 0.0010 0.0250 5.25 1.09 88.93 635 0.0008 0.0200 5.50 0.82 89.75 0.0006 0.0156 6.00 1.25 91.00 0.0003 0.0078 7.00 2.75 93.75 0.0002 0.0039 8.00 2.11 95.86 0.0001 0.0020 9.00 1.57 97.43 0.0000 0.0010 10.00 1.39 98.82 Clay 0.0000 0.0005 11.00 0.80 99.62 0.0000 0.0002 12.00 0.37 99.99 0.0000 0.0001 13.00 0.01 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ,·..i.··: .,' Sol"tinR'statlstICS~Q,lk) '.'1:. I ;.; ',,'" "1',. ,. ',II, "'1' ·'·"·1"'·'·····",' .' ..........'111.. 'I" ""111'1 I "'11" I" ,'II'" 1"1 ,1:, :,' 1:.",1:1 ," ''!¡I' I,' I,ll, " I III, ','1,,1,1' 'I ""'1 ',' 1", 111,11'. :" I" 'i.': 1 ' I' I, I', I.' 'I'll ,I, " ,i\"P'aråmeter, \ "'I,,!,¡f~äsk' 1 i"'.ih:lmåi1" ,.' r=611(: '.', MeOlin!I'!:"!',::'I":':::":"I'!':'I'I:',':,'::":":ii'!:'iIlllØi:t,I,u:IÔ:~âl!1~18Izöd,,<'i':':!'.,"i' (In) 0.0116 0.0116 0.0116 (mm) 0.2955 0.2955 0.2955 Mean, "", I Fine sand sized (In) 0 01085 0.00671 0 00806 (mm) 0.2756 0.1705 0.2048 Sorting Skewness " Kurtosis 1.409 ~oor 0.427 1.607 I' StronglY fine skewed 0.880 2.126 0.721 Very leptokurtic 0.222 1.669 2.714 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 84.69 11.17 4.14 15.31 Percentile [Weight, %] Particle Diameter [In.] [mm] [phi] 5 10 16 25 40 50 75 84 90 95 0.01847 0.46911 0.01693 0.43014 0.01572 0.39929 0.01443 0.36664 0.01273 0.32335 0.01163 0.29551 0.00727 0.18460 0.00287 0.07280 0.00079 0.02019 0.00020 0.00499 1.09 1.22 1.32 1.45 1.63 1.76 2.44 3.78 5.63 7.65 ) .. føel.8tÏ BP Alaska M PS 261 Milne Point ') C.L. File #: 57111-103054 Sample ID : 4816.1 Sieve and Laser Particle Size Analvsis 100 80 ~ 0 :ë 0) 60 ~ ~ :;:¡ C'O 40 :; E :::s (,) 20 o 4.0000 IUIIII,i' ,illllllll:1111 'III~IIIIIII 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 0.2500 "';'Ii"'. . ',". '.. ,'. ,\:. 1.',< "':'I,'~'~IC j'~~~eill;~I,$trlbü~lðn:il"I: "i·il'··' ,,"" "':':1':1,,'1:';',',"" i'I.I':,:'¡::'i'!':" '.~ I" . , l11ete "I "I "1 'I I' 1"'1 ·1' ,·r"· 'n"'LW·'I,,;~Q....j:·,n, .,.h,.,.....t'rZC,·o.l '.i"m'..·'....'1:,]:,'1"'" " rUSIVIÐshl', ~:11111:r', r':r~¡j,1i',)' :,,:,}~{;,,' ... I I'~ ~ 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ····..····..·············2Ö···········Ö:Ö331···....Ö:ä4öö···..····Ö:2S·..·-·....Ö.2¡..···· ····Ö:24····· Coarse 25 0.0280 0.7100 0.50 0.00 0.24 Sand 30 0.0232 0.5900 0.75 0.04 0.28 35 0.0197 0.5000 1.00 1.94 2.21 ···..··..··········..···¡Ö···..·· ···Ö:Ö1·S5······Ö:42ÖÖ······..·1·:2S····_·..··Š·:Š2·····.......7::;:3""... Medium 45 0.0138 0.3500 1.50 9.31 17.04 Sand 50 0.0118 0.3000 1.75 11.68 28.72 60 0.0098 0.2500 2.00 11.41 40.13 ................... ·····"7Ö···········Ö:ööä3"··..·Ö:2·1ÖÖ·..·..·..2:2S....-..··'4·.9'4..········4Š:Ö:;···· Fine 80 0.0070 0.1770 2.50 7.86 52.93 Sand 100 0.0059 0.1490 2.75 5.63 58.56 120 0.0049 0.1250 3.00 4.25 62.81 ..................... ...1¡Ö....... "'Ö:ÖÖ¡1"" .....Ö: '1 öšö........· 3: 2S...· -.... 'ff{3f ........ 66:ŠÖ.... V. Fine 170 0.0035 0.0880 3.50 3.57 70.07 Sand 200 0.0029 0.0740 3.75 3.36 73.43 230 0.0025 0.0625 4.00 2.93 76.37 270 0.0021 0.0530 4.25 2.43 78.80 325 0.0017 0.0440 4.50 1.04 79.84 Silt 400 0.0015 0.0370 4.75 1.80 81.63 450 0.0012 0.0310 5.00 1.57 83.20 500 0.0010 0.0250 5.25 2.12 85.32 635 0.0008 0.0200 5.50 1.23 86.55 0.0006 0.0156 6.00 2.11 88.67 0.0003 0.0078 7.00 4.04 92.71 0.0002 0.0039 8.00 2.51 95.22 0.0001 0.0020 9.00 1.79 97.01 0.0000 0.0010 10.00 1.38 98.38 Clay 0.0000 0.0005 11.00 0.89 99.27 0.0000 0.0002 12.00 0.51 99.78 0.0000 0.0001 13.00 0.19 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 25.0 20.0 15.0 ?fl. ~ c CD :::s 10.0 1 5.0 0.0010 0.0 0.0001 0.0002 ':".:.:¡'.:I./I"'I!'...il. ";.,.1:.1 ill:~. O.,,,~...I,ijq,.·.'::s.. tä. ,·t.I.lt.IÞ$.··i'fF.O. ·.I.k~."i':! :. I!.,,:, ,. le'II.'.: !\:', I',': <, i:','ïl;'\'" 'II:\\-i'.,"~; ,:; ¡: I,;; I": .': I'l",', '11'::",01"::. ',Ii);,>: ,", ,1:1,,' ..';.,,:,' :,1, ",/ ":',: ;1' \ i', ",1,11':':, II' I'"~ ,Pårameteri I"': "',"fr¡usk"· ,1'II1o,an'l! ,'. ,Folk;,'. M¡!:Ilenl:;:I:I!:';!!!!!';i!!!"II!I::!,I:!,'!'I'I:!I:I'I'!:;:!I'::II'I!!';:!'lil!: ··: iIIlñe':ii¡nClI'slze~"':¡:"!::II"::.il:',:i": (In) 0.0081 0.0081 0.0081 (mm) 0.2063 0.2063 0.2063 Mear¡, i 1"li;" ;."".¡' 'I,,¡ ','" 1 "flhesand,.lzed (In) 0.00767 0.00419 0.00523 (mm) 0.1949 0.1065 0.1328 Sorting Sk8\\vnes. Kurtosis I Poor 0.289 1.934 2.135 Stro'hgly fine skewed 0.726 1.250 0.593 Lepokurtlc 0.310 0.910 1.282 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 76.37 18.86 4.78 23.63 Percentile [Weight, %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.01845 0.46864 0.01630 0.41408 0.01453 0.36913 0.01259 0.31969 0.00993 0.25214 0.00812 0.20629 0.00276 0.07014 0.00121 0.03075 0.00047 0.01193 0.00016 0.00407 1.09 1.27 1.44 1.65 1.99 2.28 3.83 5.02 6.39 7.94 ') .. DJre ... BP Alaska M PS 261 Milne Point ) C.L. File # : 57111-103054 Sample ID : 4824.1 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 ~ 0 :ë 21.0 ';fl. 0'1 60 ~ ~ c .~ G) ~ 1õ C' :; 40 14.0 £ E ~ 0 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ... ~attlçlelSl2ø :QI$trlbutløn '. ".1' '" ".", I.".~~~" \. ',' "1.'.". '. ":"."".','.' 'DI'am~tR~ '. "', .1 'I; ··'1;:.···:' ....,./.' "I': ",' ::~$lght'~Iø~ ;:', .... I:'!I,·'¡' I' 1,~,':rU'$i'M'esh'f>, I 111",rln~lT":';"",.~:I,rh1'ffi1:':¡'>,I,:;-:':":r:':~I:1': " ,',~""IÎrI'~I.l:!:",':):I,',raû'riI'~1"'I' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ...................... ...2·Ò...·..... "Ö:Ö33 r·...· Ö :ä4ÖÖ'........ ö :25" ..-. ...·ò·:ò·ò...........ö: öö"'" Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 2.25 2.25 . ·..···..············..·'4ò· ·..·,··..·Ö:Ö1·SŠ··..··Ö:42ÖÖ·········1·:25·..·_··..'4.Tg········'··6:44'·'.. Medium 45 0.0138 0.3500 1.50 9.25 15.69 Sand 50 0.0118 0.3000 1.75 14.21 29.90 60 0.0098 0.2500 2.00 17.01 46.91 ..,..,.,..." '··'··'·..'·7Ö'·'··'··'··ö:ööä3'·..·'Ö:2·1ÖÖ·..·'·'·'2:25·..,-....ä·.4·1·'·'·'··'·ŠŠ:32·'.. Fine 80 0.0070 0.1770 2.50 14.18 69.50 Sand 100 0.0059 0.1490 2.75 9.12 78.62 120 0.0049 0.1250 3.00 4.64 83.26 ,......·...............T¡Ö........·Ö:ÖÖ¡r·...·Ö·:1ÖSÖ'.......'3:2Š...'-.....2':2S.........äS:Š2·..· V. Fine 170 0.0035 0.0880 3.50 1.46 86.98 Sand 200 0.0029 0.0740 3.75 1.29 88.27 230 0.0025 0.0625 4.00 1.03 89.30 270 0.0021 0.0530 4.25 0.90 90.20 325 0.0017 0.0440 4.50 0.37 90.57 Silt 400 0.0015 0.0370 4.75 0.59 91.16 450 0.0012 0.0310 5.00 0.64 91.80 500 0.0010 0.0250 5.25 0.74 92.54 635 0.0008 0.0200 5.50 0.58 93.12 0.0006 0.0156 6.00 0.75 93.87 0.0003 0.0078 7.00 1.74 95.61 0.0002 0.0039 8.00 1.30 96.91 0.0001 0.0020 9.00 1.04 97.95 0.0000 0.0010 10.00 1.05 99.00 Clay 0.0000 0.0005 11.00 0.68 99.68 0.0000 0.0002 12.00 0.31 99.99 0.0000 0.0001 13.00 0.01 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ",..,."1".":",;:",,;,,,:, I:Se:ttlna·IStåtlstl.CS:'(Fqlkl:III,,! 1""11,: .,..:'....::.",..:' .... ·...·I".·'~~~~~~t~~,,:,I:!..'··'I,":T~~~i~:·.·.'I.:1"I'~~~.~.:'.·".."".';"":~~ '~I::' 'Meetlan" "':'1'::1\;',: " ,:'1,1'" ;.',";"I'! : ,': 'Pine' .~~tI'äl:ted ',I (In) 0.0096 0.0096 0.0096 (mm) 0.2435 0.2435 0.2435 Meani,.,·.: .1,', .·....I;·.···Flne, sand. sized (In) 0.00972 0.00841 0.00878 (mm) 0.2470 0.2135 0.2231 Sorth,g Skewness Kurtosis 1.358 I~ö()r' ' 0.592 1.225 Strongly.fine skewed 0.969 2.495 0.463 Very leptokurtic 0.213 2.696 2.595 Component Percentages Gravel I Sand I Silt I. Clay I Slit + Clay 0.00 89.30 7.61 3.09 10.70 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] [phi] 0.01800 0.45708 0.01577 0.40051 0.01420 0.36061 0.01261 0.32029 0.01066 0.27069 0.00959 0.24352 0.00684 0.17368 0.00498 0.12641 0.00220 0.05588 0.00037 0.00949 1.13 1.32 1.47 1.64 1.89 2.04 2.53 2.98 4.16 6.72 ') .. Care lab BP Alaska MPS 261 Milne Point ) C.L. File # : 57111-103054 Sample ID : 4864.0 Sieve and Laser Particle Size Analvsis 100 40,0 80 32.0 ~ 0 ..: .c 24.0 "#. 0) 60 ~ >; CJ C .~ Q) ::J 'tó 0- '3 40 16.0 .t E ::J 0 20 8.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) . ·..,,:',"~:'I', ,.:,:i':¡,lli ".".'.'.'..... Pätt¡.ØI.i'~SIZø'D¡'~r¡.,b.···.~ti~.n, '. I!. ~I,,::".::,i::d,(.'!:.·.'¡,.::¡'.:::·::I:¡,:lil'i:I'· I . .... '.,"':,JU~:~~$hr. .,'~,~~~t~~:.'I"~~tr",·:',."I,:"i~~,:~: ,'::illl:'",i"~ ~~~~~le~'6~~'i1): 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ...................... ...2"ö......... ..ö: Ö331"...... ö·.ä4öö·..... "'Ö:25'" .-. ...·ö.Ts...·...... ö: '15"... Coarse 25 0.0280 0.7100 0.50 0.00 0.15 Sand 30 0.0232 0.5900 0.75 0.00 0.15 35 0.0197 0.5000 1.00 0.00 0.15 ...,.,.".,..,......,.,. '4·ó'·'·..·'·' ·ö:ö 1·6S'·.... Ö:42ÖÖ··'·,·.. ·1':25"·· -.., ..ó·:ö·ö··...'··'·' ö: 15''',· Medium 45 0.0138 0.3500 1.50 0.00 0.15 Sand 50 0.0118 0.3000 1.75 0.11 0.26 60 0.0098 0.2500 2.00 4.08 4.34 ...................... ...fö..·.......Ö :ÖÖä3'..... Ö::2"1 öö.... .....2:25...·_.. ..·Š·:Ö3..........' 9: 3ä..'" Fine 80 0.0070 0.1770 2.50 16.44 25.81 Sand 100 0.0059 0.1490 2.75 19.47 45.28 120 0.0049 0.1250 3.00 15.63 60.91 ..,..,.,."..,..,..,." ·14Ö.."'·.. ·Ö:ÖÖ41..·'... Ö:'1 ÖSÖ··'·.... ·3:25..··-'.. ·ä":63..·"··'· 69:54.... v. Fine 170 0.0035 0.0880 3.50 3.12 72.65 Sand 200 0.0029 0.0740 3.75 1.20 73.85 230 0.0025 0.0625 4.00 1.32 75.17 270 0.0021 0.0530 4.25 1.63 76.79 325 0.0017 0.0440 4.50 0.83 77.62 Silt 400 0.0015 0.0370 4.75 1.54 79.16 450 0.0012 0.0310 5.00 1.37 80.53 500 0.0010 0.0250 5.25 1.98 82.51 635 0.0008 0.0200 5.50 1.23 83.73 0.0006 0.0156 6.00 2.14 85.87 0.0003 0.0078 7.00 4.39 90.26 0.0002 0.0039 8.00 3.17 93.43 0.0001 0.0020 9.00 2.51 95.94 0.0000 0.0010 10.00 1.99 97.92 Clay 0.0000 0.0005 11.00 1.20 99.12 0.0000 0.0002 12.00 0.62 99.74 0.0000 0.0001 13.00 0.23 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 1"\:·'·!:i"'i',',~'!¡'.:I;",~~~i,~g:l~tå~I~~I~·I'(~QIk)' ,':,""",':" ::Ii i!l, '1':,1,: I '",'. P""':'II'~" ':"""1/,'1: 'I,ll. ",:i' J,I'li:""I' ',,"il. .,1'· I II ' "'..II' l I' , ,: \ia..amqdJ~"." ""I Trasl\' "', nman" I r",y K Mtd¡ä~::"I'1 ,:",,':" "("",I':·'II""I'.'II!,i l'I¡:"f:'¡h8åå¡i ,~rslzèd: '·~,I.",i···'·· (In) 0.0060 0.0060 0.0060 (mm) 0.1520 0.1520 0.1520 M.Gan 'ill!"'\ "t, "(q'IVery'inesai:lcfsized (In) 0.00509 0.00260 0.00344 (mm) 0.1294 0.0661 0.0873 sorting,:"·' Skewness Kurtosis I Poor 0.312 1.715 1.835 Strongly fine skewed 0.741 1.531 0.749 Veryleptokurtlc 0.289 0.954 1.728 comrnent Percentages Gravel I Sand . Silt I Clay I Silt + Clay 0.00 75.17 18.26 6.57 24.83 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] (phn 0.00979 0.24870 0.00898 0.22799 0.00834 0.21184 0.00760 0.19307 0.00661 0.16787 0.00598 0.15195 0.00258 0.06564 0.00081 0.02064 0.00030 0.00758 0.00010 0.00263 2.01 2.13 2.24 2.37 2.57 2.72 3.93 5.60 7.04 8.57 .. Core I.fJb ) BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 4868.1 Sieve and Laser Particle Size Analvsis 100 40.0 80 32.0 '#. :ë 24.0 '#. æ 60 ~ >; CJ C .~ CI) ~ ñi 0" "5 40 16.0 £ E ~ (.) 20 8.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 " .! ,'.,', .':'.'1';'\,. ",'....,.."".' '.'. " . 'D'I'::~a~rte'· ti~~e..~ ~e:,~I~~'~~~i~~'I::··. :1,"1:: ;·;'I"<:~~I·~~;'~il;~'III"II':~ , I" 1'1 II·" ", ,~!~ .... I I",' '1""11'·:" , 1'.,".:, ,.1 ,I, ':1""" ',' ""I :". I""'''' .~~" 11'1', kil,'.".' i". '.. ':,.~USMe$hl·" "',tih:t,ll' 1,.',I',rmmrl.' r"dll"'·I!innèl;l','i,,"(Um:l' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....................... ..:2Ö·........ ..Ö:Ö331....... ö:ä4öö·..·...·· Ö :25.... -... ..ò·:ò·ö.......... ö: öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ....................... ..4·Ö........ "ö:ö 1"65.....· Ö:42ÖÖ........ T 25·... -... ..ò·:ò·ò.......·...ö: ÖÖ·.... Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 4.74 4.74 ..................... ··..7õ··········ö:ööär..·..Ö:21ÖÖ··....···2:25....-..··¡:f2·····..····9:46..··· Fine 80 0.0070 0.1770 2.50 17.06 26.52 Sand 100 0.0059 0.1490 2.75 22.60 49.12 120 0.0049 0.1250 3.00 16.96 66.08 ...................... ..14·Ö······.. ·Ö:Öö41··..··· Ö:"1 ÖSÖ····.... '~r 25.... -.... ·f.4fi····..··· 73:57···· v. Fine 170 0.0035 0.0880 3.50 3.18 76.75 Sand 200 0.0029 0.0740 3.75 2.58 79.33 230 0.0025 0.0625 4.00 2.25 81.58 270 0.0021 0.0530 4.25 1.71 83.29 325 0.0017 0.0440 4.50 0.73 84.02 Silt 400 0.0015 0.0370 4.75 1.31 85.33 450 0.0012 0.0310 5.00 1.22 86.55 500 0.0010 0.0250 5.25 1.38 87.93 635 0.0008 0.0200 5.50 1.07 89.00 0.0006 0.0156 6.00 1.26 90.26 0.0003 0.0078 7.00 2.98 93.24 0.0002 0.0039 8.00 2.20 95.44 0.0001 0.0020 9.00 1.62 97.06 0.0000 0.0010 10.00 1.41 98.47 Clay 0.0000 0.0005 11.00 0.88 99.35 0.0000 0.0002 12.00 0.52 99.87 0.0000 0.0001 13.00 0.13 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 '::'I:'.ili".I."III!¡:'"II',I.li:"SOl1iriØ$tatlstiu:(F<Jlk\I·:":ii,,,!I.·,!I,!i:!ii't: ", ,'.'., I· "".1 ...:, I. I, '.'" ", .1"" ,,'I: 1':,1' . ""':.'."', "I ,,', ..' " J..¡ '" . :"" ," I' , ".'IIII,I":ÎI'IIIII~III:I'I""",I"."I, "I'i".~."'I':' 11,IIII""ll!II'"'I I' I'I:'II",.",I",.. ,:",I,,.";:"1,,1'1'1',',1 ,"i", Páramijter, ,,:, LI'I'II,fask;',ilnmån,i!'·I.;. f=olk',· MêCllål:i'··.·, ",;i':',!:'; :111""1;'1;':, '1"I·.'lli:'IIIF'I'Ii~ls'åndsl~¡d. ':'.:.,.' 'II .·.··.1 (In) 0.0062 0.0062 0.0062 (mm) 0.1583 0.1583 0.1583 "'.an I Very fine sand sized (In) 0 00584 000400 000-164 (mm) 0.1484 0.1016 0.1178 sorting'" Skewness KurtoSis ,,,oar' 1.371 0.482 1.411 StfOnglY.fhïe skèwed 0.893 2.144 0.691 Very leptokurtlc 0.214 1.772 2.630 Component Percentages Gravel I Sand·1 . Slit I Clay I Silt + Clay 0.00 81.58 13.86 4.56 18.42 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] (mm] (phi] 0.00986 0.25035 0.00898 0.22816 0.00830 0.21080 0.00762 0.19367 0.00677 0.17184 0.00623 0.15831 0.00406 0.10311 0.00193 0.04898 0.00064 0.01628 0.00017 0.00438 2.00 2.13 2.25 2.37 2.54 2.66 3.28 4.35 5.94 7.83 ') . OnLllb BP Alaska MPS 261 Milne Point ) C.L. File # : 57111·103054 Sample ID : 4874.1 Sieve and Laser Particle Size Analvsis 100 40.0 80 32.0 ~ 0 1: 24.0 '#. OJ 60 ~ >; to) c ~ CD ~ :¡; r::r cu 40 160 e "3 E . u. ~ " 20 8.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) "',, ,,',,' ':p.. å.,litl.cle, ~SlzAD, ..I$trlbtiti. ^".I..;"I' ,; .·.·.i'. ':"....:..'.'...,:;:,'~~.' ";,~I'" '.....,\ "," \ ~J "'( 1 \ !! l . 'II '. ~IJ. ,', '~,il,a.rmIL~t.~,~:,.',. "i. ','r'J1;:I'.·'···,··,"I':. ';':":."r'I.,I~',l: I:. ,.,,1 ·.:'::r: .'1" I'!'II' 1,.,,~g, ~tr:J,¡¡°Û'¿:1' ¡ :rus', Mi:lshl :'" ,.,..;, ,I "'I"" ", ,...-11""'1"" '..u ', I, .': , "" . nc . ", ',", ,"" III~ I' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ..........,............ ..2Ö...'...... ·Ö:Ö3'3'1...·... ö:ä4öö.........ö :25....-.. ...ö:o·ö.......... ö: öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ....................... ..4·Ö..·.... "'ö:ö 1'65'".... Ö:42ÖÖ·......' "1":25.... -.. ...0·:0·0·....... "'ö :ÖÖ..... Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 4.89 4.89 ...................,... ..7"0........ ...ö:ööä3'...... ö: 2'1 öö....... ..2:25...· - ...·"4·.'7·2...·......' 9: 61".... Fine 80 0.0070 0.1770 2.50 16.54 26.15 Sand 100 0.0059 0.1490 2.75 21.48 47.63 120 0.0049 0.1250 3.00 16.51 64.14 .,...,..,.,............ '1"4'Ö·'·····' ·Ö:ÖÒ41·..·'·' Ö:·1ÖSÖ··'·..·,· 3:25..·' -.... ·7":7"9'··'·'·,.. 71 :93.... v. Fine 170 0.0035 0.0880 3.50 3.31 75.24 Sand 200 0.0029 0.0740 3.75 2.40 77.64 230 0.0025 0.0625 4.00 2.05 79.69 270 0.0021 0.0530 4.25 1.58 81.27 325 0.0017 0.0440 4.50 0.71 81.98 Silt 400 0.0015 0.0370 4.75 1.32 83.30 450 0.0012 0.0310 5.00 1.23 84.53 500 0.0010 0.0250 5.25 1.57 86.10 635 0.0008 0.0200 5.50 1.04 87.14 0.0006 0.0156 6.00 1.74 88.88 0.0003 0.0078 7.00 3.79 92.67 0.0002 0.0039 8.00 2.58 95.25 0.0001 0.0020 9.00 1.73 96.98 0.0000 0.0010 10.00 1.50 98.48 Clay 0.0000 0.0005 11.00 0.97 99.45 0.0000 0.0002 12.00 0.46 99.91 0.0000 0.0001 13.00 0.09 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 1.'I,i: "I: I 'Sörth;,p,StatlstlØ$(Fblk),::,'i,'" ~ .', I'I,,'~" ,:, 'I~:',"i :",' I :'" :", ~:"II'I'I' ,,' I, .,' ,:,,",;',: I ,'I : l'li I I';'" I "I, I",'" ,; II ',:," 'II. 'I :,1, , ':Þ$~~n1ðt~r'¡ : Ii:' ,1,"'H~$k"I,' I, 'l'ninári,,:,'::::1 :'Þðlk ·l\IIe618""il",I:"",II!,I:,: ':"'1'1: I' '."1:,"':': ,)'IFI'n'e';!8'ândllslzed ! :'.'.:' .',:",','." , (In) 0.0061 0.0061 0.0061 (mm) 0.1561 0.1561 0.1561 Mean I Very fine sand sized (In, 000565 0.00347 000420 (mm) 0.1436 0.0881 0.1066 S~rtlng,¡ . " , I ¡Poor 0.418 1.529 1.434 Skewné" Strongly flne.kewed 0.863 1.813 0.712 KurtoSis Veryleptokurtlc 0.229 1.358 2.337 comrnent Percentages Gravel I Sand Slit I Clay I Slit + Clay 0.00 79.69 15.56 4.75 20.31 Percentile Particle Diameter [Weight, %1 [In.] [mm] [phi] 5 0.00988 0.25105 1.99 10 0.00900 0.22856 2.13 16 0.00830 0.21091 2.25 25 0.00761 0.19322 2.37 40 0.00671 0.17035 2.55 50 0.00614 0.15606 2.68 75 0.00370 0.09390 3.41 84 0.00145 0.03684 4.76 90 0.00048 0.01208 6.37 95 0.00016 0.00410 7.93 ') .. røsLatÏ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111·103054 Sample ID : 4960.1 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 ~ 15.0 ?fl. C) 60 ~ ~ c CI) CI) .~ j ñi 0" :¡ 40 10.0 Æ E j (J 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ". Pal1i(:le$'lze'DistrlbutiÓn;, ,','.iI. , , .... '~I .' ..,.'" "'" "D'~. ~e. te. r ".':" ". " ,. ". it; ,t, 1":'1',1,1 ,';I·r, ,.. '~,:;",' ,WejgtltO/~'i,I" , rus Meshl ,··,·.'tl'"i1.1"''';''l~ml,,',:,'r~~/,;Þ,' rln'cl.1'I,'tCüm~l' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 .".....,..,..,..,."... '2'Ö"""'" ·Ö:Ö331·'..... Ö:ä4ÖÖ·......,· Ö:25.... -..., ·Ö·.ÖÖ..·..'·····Ö: ÖÖ....· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ..,..., "..,... '·'·'··'·¡Ö·'·'··' "··Ö:Ö1'SŠ··'·..Ö:42ÖÖ·'·..'·..1·:25...._·'..Õ:Ö·Ö·,·..,··,··Ö:ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ....................··...fö·..'......·ö:ööä3......Ö:2·1ÖÖ..·......2:25...·-·....Ö:ÖÖ.........'Ö:ÖÖ....· Fine 80 0.0070 0.1770 2.50 0.17 0.17 Sand 100 0.0059 0.1490 2.75 2.27 2.44 120 0.0049 0.1250 3.00 6.73 9.17 ..,... ,." """""""1'¡Ö"'" '·'··Ö:ÖÖ41·'..·'·Ö:·1ÖSÖ·'·..·..·:f25'·..-·'·'1·1".'öf·..'··'·2Ö:24···· V. Fine 170 0.0035 0.0880 3.50 12.65 32.89 Sand 200 0.0029 0.0740 3.75 10.90 43.79 230 0.0025 0.0625 4.00 7.38 51.17 270 0.0021 0.0530 4.25 4.49 55.66 325 0.0017 0.0440 4.50 1.68 57.34 Silt 400 0.0015 0.0370 4.75 3.00 60.34 450 0.0012 0.0310 5.00 2.98 63.32 500 0.0010 0.0250 5.25 4.53 67.85 635 0.0008 0.0200 5.50 2.81 70.66 0.0006 0.0156 6.00 5.05 75.71 0.0003 0.0078 7.00 9.14 84.85 0.0002 0.0039 8.00 5.50 90.35 0.0001 0.0020 9.00 3.79 94.14 0.0000 0.0010 10.00 2.74 96.88 Clay 0.0000 0.0005 11.00 1.71 98.59 0.0000 0.0002 12.00 0.97 99.56 0.0000 0.0001 13.00 0.39 99.95 0.0000 0.0001 14.00 0.05 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ,:·,~!I,",·,,:,'·'I~.."..'.~:i:·,,'tll,'Sôi1 ng¡Statl'stlcsi'.fF'þlkl,",:::":'I'..·..·'.1 :..·'·,.··.,.1::,:.··: ' ",." " '''I :,', '., .,' ,', . ·1' ,,', .""", I'" ,·"r, .,." 1'1" " " '""' 11'1' 1."'.,11,1111,'.' I "I'I'l"1 "I"l., ...,.ill"111 1:1111".1'11.1":".,,1111,,,,'11.:11,"11"" I". ,..'1,,'."'1,' "',' "',' Ra"åm'etei' '""'l1task",,, .',I"m$"":,, Fblk;,'i pJledls.,;i'I",'" ' "i '.' "" ,',':',:~erY"flnê,8andsizêd (In) 0.0026 0.0026 0.0026 (mm) 0.0664 0.0664 0.0664 11/I811"' ""':"';1:",',,, . ,I: ..',' :$iltsized,'r ," (In) 0.00235 0.00120 0.00155 (mm) 0.0597 0.0304 0.0395 Sorting SkeWness Kurtosis 2.563 POOI:"" 0.257 1.959 Strongly fine skewed 0.609 1.068 0.611 Mesokurtic 0.346 0.650 0.976 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 51.17 39.18 9.65 48.83 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phi] 0.00577 0.00516 0.00466 0.00408 0.00325 0.00261 0.00062 0.00031 0.00016 0.00007 0.14654 0.13112 0.11838 0.10363 0.08251 0.06640 0.01577 0.00783 0.00400 0.00166 2.77 2.93 3.08 3.27 3.60 3.91 5.99 7.00 7.96 9.24 A n:.e I.i!IIb 80 ~ 0 :ë C) 60 ~ ~ co 40 "5 E = 0 20 ) BP Alaska M PS 261 Milne Point ") C.L. File #: 57111-103054 Sample ID : 4981.0 Sieve and Laser Particle Size Analvsis 100 : ,':: .i I';i !I:i, ::1 o " 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I,i I ,.", ,...I'Påij:iÓléSlze'Dlstribu~ ()h't"" '...." : I, I,., ,\::1,'1'1"'.'" :1, , . ...., ."¡''::'"'' '.", III' DI~m~~~1 'I :"':i' . I" I' ..'\.. ,,' '. "I,,}I: ¡. I I We,gþ¡ ~II.· . . '. , , ,.! rus, Me$:hl' :::,~I', nn¡J:'I", ,'::',I,'ir",ffil" :',I¡,"f,cb':J'I':!i':¡.I'liiid~c ll'i" '11:,rCtlnÙ',:: 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 .. ..... .......... ... ·····2·Ö···..·····Ö:Ö331·······ö:ä4ÖÖ···....··Ö:25....-....·ö·.ÕÖ·..··..····Ö:ÖÖ....· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ ¡Ö···..··· "Ö:Ö 1f3S····· ·Ö:42ÖÖ·······..1": 25.... -.... "ö."ö·ö......··· 'ö: ÖÖ····· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ....................... ..7"Ö..... ......ö:ööä3"..·.. ö: 2'1 öö......... 2:25.... -. ...·ö:öT...·.. ....ö: Ö:¡..... Fine 80 0.0070 0.1770 2.50 0.09 0.10 Sand 100 0.0059 0.1490 2.75 0.69 0.79 120 0.0049 0.1250 3.00 2.31 3.10 ....................... ·1'4·Ö·..······ ·Ö:Öö41..·.... Ö:'1 ÖSÖ..·..·.. ·3:25···· -.. ...Š·:Ö1·········.. ä::¡:¡....· V. Fine 170 0.0035 0.0880 3.50 7.93 16.04 Sand 200 0.0029 0.0740 3.75 9.74 25.78 230 0.0025 0.0625 4.00 9.55 35.33 270 0.0021 0.0530 4.25 7.70 43.03 325 0.0017 0.0440 4.50 3.00 46.03 Silt 400 0.0015 0.0370 4.75 4.72 50.75 450 0.0012 0.0310 5.00 3.83 54.58 500 0.0010 0.0250 5.25 5.28 59.86 635 0.0008 0.0200 5.50 3.30 63.16 0.0006 0.0156 6.00 6.48 69.64 0.0003 0.0078 7.00 12.27 81.91 0.0002 0.0039 8.00 6.87 88.78 0.0001 0.0020 9.00 4.38 93.16 0.0000 0.0010 10.00 3.09 96.25 Clay 0.0000 0.0005 11.00 2.00 98.25 0.0000 0.0002 12.00 1.20 99.45 0.0000 0.0001 13.00 0.48 99.93 0.0000 0.0001 14.00 0.07 100.00 . Distribution precludes calculation of these statistical parameters 25.0 20.0 15.0 ';!.. :>; (,) c Q) = C" 10 0 ~ . u. 5.0 0.0010 0.0 0.0001 0.0002 :. t' ,,,,'II"~'"~ 1,~qr1:lrU:I'Stå~lstlcs(FQlkr", '. i,1 i :,'I~r,",y:II','''\, :,0."'(I"""::",:1I,.,,jl', "i':"",I','II" :."':','1 Ii "11,·,',',1', " I '..":':'!!" I,l,: ,,!,I''¡'I '''~ ':,,"!. 1'."'1' ,.,:,'1,' I~II'."'" ,'I' ,':',~I"(.'I'" I, /1.,,1 ::' ,!.".:III."." I " II.~I'I I I, I" :"I:,'I.III ,IIII '"~ '~arârtiiéter. 1 .:',, 'ITrask ",! I InMan 1:,1· ,,: .·Folkl' . "'!tal'll""" ''i,I;!,I;,,'I'I,'I'.,:'1 "111',: ':'1 ,:!,I"":',:';I:', "',I}$lIf'illîiêl"li,..' ":I'i"':: ." (In) 0.0017 0.0017 0.0017 (mm) 0.0420 0.0420 0.0420 Meåri:'·;; ....'1';,,·., ':1·:1·:;·.;' ::.' ¡' .,!,:: '1..::Snt.$lzed, .:..i,,::,.:'·.'., (In) 0.00176 0.00093 0.00113 (mm) 0.0447 0.0237 0.0287 Sorting .... ,', I ' I" Poor" 0.257 1.966 2.643 Skewness, Strongly fine skewed 0.703 0.869 0.473 Kurtosis Mesokurtlc 0.327 0.657 0.950 . Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 35.33 53.45 11.22 64.67 Percentile Particle Diameter [Weight, %] [In.] [mm] [phO 5 0.00483 0.12263 3.03 10 0.00417 0.10585 3.24 16 0.00364 0.09248 3.43 25 0.00308 0.07817 3.68 40 0.00228 0.05785 4.11 50 0.00166 0.04205 4.57 75 0.00044 0.01119 6.48 84 0.00024 0.00609 7.36 90 0.00013 0.00329 8.25 95 0.00005 0.00136 9.53 ) .. DJreI.atÌ BP Alaska MPS 261 Milne Point ") C.L. File #: 57111-103054 Sample ID : 4988.1 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 'if!. :ë 15.0 'if!. 0) 60 ~ ~ c .~ ( ) :s 1ã C" :i 40 10.0 at E :s 0 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I I Palitlcle SI~elli)lsttlþtitlô" \ I I I I I II I " 1.1' '" ':':"'" .,1, '1,1.'" I !tlatn~tèf " I I~ 11II1 'III'} I WØ}ght ~>~' 'i ,rOSIMes"l'I,1 I 'I, rlnn', I II rmri11': I ',I'hb"~ 1':"'1:, nhlçl.1', 'I rCttm:1 I 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ 2"ö....· .....Ö:Ö331"...... ö:ä4öö·..·.. ...Ö:2S·... - .....ö:òš..·......· Ö :Ö5..... Coarse 25 0.0280 0.7100 0.50 0.02 0.07 Sand 30 0.0232 0.5900 0.75 0.05 0.12 35 0.0197 0.5000 1.00 0.10 0.22 ........................ '4Ò···········Ö:Ö1·6S····..Ö:42ÖÖ···· ·····1·:2S····-·····Ö:2S·....·····Ö:5Ö·.... Medium 45 0.0138 0.3500 1.50 0.61 1.11 Sand 50 0.0118 0.3000 1.75 1.11 2.22 60 0.0098 0.2500 2.00 1.85 4.07 ........................ ·:;Ö..····.. ..Ö:ÖÖã3..... ·Ö: 21ÖÖ··...... ·2:25.... -.. ..·1·:3·Ò.....··...· 5:37..··· Fine 80 0.0070 0.1770 2.50 3.78 9.15 Sand 100 0.0059 0.1490 2.75 6.14 15.29 120 0.0049 0.1250 3.00 9.07 24.36 ..................... ...14·Ò·..·... ...Ö:ÖÖ41......· Ö:'1 Ö5Ö·.......· 3: 2S....··... rröè......... 35:45.... v. Fine 170 0.0035 0.0880 3.50 10.87 46.32 Sand 200 0.0029 0.0740 3.75 8.62 54.94 230 0.0025 0.0625 4.00 5.88 60.82 270 0.0021 0.0530 4.25 3.92 64.74 325 0.0017 0.0440 4.50 1.57 66.31 Silt 400 0.0015 0.0370 4.75 2.81 69.12 450 0.0012 0.0310 5.00 2.60 71.72 500 0.0010 0.0250 5.25 3.60 75.32 635 0.0008 0.0200 5.50 2.11 77.43 0.0006 0.0156 6.00 3.68 81.11 0.0003 0.0078 7.00 6.82 87.93 0.0002 0.0039 8.00 4.26 92.19 0.0001 0.0020 9.00 2.99 95.18 0.0000 0.0010 10.00 2.22 97.40 Clay 0.0000 0.0005 11.00 1.41 98.81 0.0000 0.0002 12.00 0.82 99.63 0.0000 0.0001 13.00 0.33 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ~I,'(,',;: l'II'II\'I:,I'Sortli1g:iStatls~C$'(foUdill :,111 ,.~ I i,i' ;:'," ',;":"1': ;:!',!: ;.:,:' :1;,:,: }:'I!, ~Ii:,i,':; "I:¡:I' ,':I;,'I,~;,'!;I'i'.;,.':;,:::,!i'",~,:;·,·:::,",', Ii',',: ,I "';"1 ,i:,~,i:'i ",':",'" :,I:;III~":.',',,, I,;:,' ,:¡,I 1"11 Patämeter:11 "....1,:' :,.tråS (,',1 ,',In,nån"i,,:,' ,I,.... '::Folk,}" MCRI.lln::::I,I:llill!I·,I.',!IIIII"!!i'il I: i'.',I:,1.li:!lli!·'I!I~I'lil .!i,:I·I~':II:I.·,·.II.I\\,llflni!isåni:J!",Jz.al·.I·,i'II!:I..I!'·'I!:II' '!i; (In) 0.0034 0.0034 0.0034 (mm) 0.0861 0.0861 0.0861 Møari'" ,ii', "1":':1'1 '¡;" Silt sized (In) 0.00311 0.00165 o 00210 (mm) 0.0791 0.0420 0.0533 Sol'tll1g, ' ~Qór 2.228 0.267 1.983 Skewness Kurtosis . Strongly flneskøwed 0.687 1.021 0.558 Lepokurtlc 0.291 0.785 1.205 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 60.82 31.37 7.81 39.18 Percentile [Weight, ·"1 5 10 16 25 40 50 75 84 90 95 Particle Diameter [1n.] [mm] [phI} 0.00929 0.23590 0.00733 0.18622 0.00619 0.15721 0.00518 0.13163 0.00406 0.10303 0.00339 0.08605 0.00104 0.02652 0.00044 0.01121 0.00021 0.00541 0.00008 0.00212 2.08 2.42 2.67 2.93 3.28 3.54 5.24 6.48 7.53 8.88 ) .& CøtelBb BP Alaska M PS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5023.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ::::e 0 ::ë 12.0 ';fl. 0) 60 ~ ~ c (\) (\) .~ ::s 1ã 0- 40 8.0 e "5 I.L E ::s 0 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I .. :.. ..',:: P~rtlcl~:SizeIIID~strlþutlðn 'I·· ,I .,. ,., .'. ',' I .:" i'i :" ,., 1..1" ','1," ',:1 ." 'ID ~me~ ';"I.·. '1" :" Iii "., ':"1"11"'.";"<:'11', '.., i.,}: I': .\,W,~ght,~ ,'II', "'I.' " , fl:lSMest11 I.·, ':nn~l' ., .',' 'rmm1"II' ··::1:'(: di,:,~i::I, ;"'; nn'~ .l',:,I:ircunul 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ '2·0··....··.. ·Ö:Ö331'·..··· Ö:ä4ÖÖ·····.... Ö :25'" .-... ..ò·:ò'5....··..·· ö: ös....· Coarse 25 0.0280 0.7100 0.50 0.04 0.09 Sand 30 0.0232 0.5900 0.75 0.15 0.24 35 0.0197 0.5000 1.00 0.53 0.77 ........................ '4·0........ ...ö:ö 1'65...·.. Ö:42ÖÖ·..· .....1·:25·..· _.....1"."4 r......... '2: l' ä..... Medium 45 0.0138 0.3500 1.50 2.75 4.93 Sand 50 0.0118 0.3000 1.75 4.59 9.52 60 0.0098 0.2500 2.00 6.69 16.21 ····......·....···......·7"Ö··· ·..····Ö:ÖÖŠ3·..···Ö:21ÖÖ··..···..2:25····_····'4·.Õ3···..··..·2Ö:24···· Fine 80 0.0070 0.1770 2.50 8.96 29.20 Sand 100 0.0059 0.1490 2.75 9.38 38.58 120 0.0049 0.1250 3.00 8.88 47.46 ....................... ·1'4·Ò···...... ·Ö:Öö41·····.. Ö :'1 ÖSÖ..·....· ·3:25·..· -... ..7'.'4·6·..······· 54:92···· v. Fine 170 0.0035 0.0880 3.50 5.54 60.46 Sand 200 0.0029 0.0740 3.75 3.91 64.37 230 0.0025 0.0625 4.00 2.99 67.36 270 0.0021 0.0530 4.25 2.61 69.97 325 0.0017 0.0440 4.50 1.25 71.22 Silt 400 0.0015 0.0370 4.75 2.40 73.62 450 0.0012 0.0310 5.00 2.28 75.90 500 0.0010 0.0250 5.25 3.14 79.04 635 0.0008 0.0200 5.50 1.82 80.86 0.0006 0.0156 6.00 3.20 84.06 0.0003 0.0078 7.00 6.09 90.15 0.0002 0.0039 8.00 3.60 93.75 0.0001 0.0020 9.00 2.36 96.11 0.0000 0.0010 10.00 1.74 97.85 Clay 0.0000 0.0005 11.00 1.15 99.00 0.0000 0.0002 12.00 0.68 99.68 0.0000 0.0001 13.00 0.28 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 , ..:I~0l1ln~Statl8tlc$:tFblkl,' .·.:1 I:'·: ,'1'1'1 ": :"f: 'i·, '~"I I!II: ',' ,I, I, ":."11 ~"I,'III'.·.II' ':". ;.:111., '\,'/,, 1.1'1' 11:'i·~ II :':' ;'1':':' ,'I'" q' 1(111\'1 ", ;" I': I '1,1 ;;,: :,1 ,:.' I' ,.Paramète,-.:",:'.',!":rtaäk:, :'1 '.llnmåri .':"', ::Folk '." M~llin':' '":"."",,,1" ',1',".':"':" "I:;¡;"lriê:saht'lsIZêd'i,d',I:r··' (In) 0.0049 0.0049 0.0049 (mm) 0.1256 0.1256 0.1256 Mean I Very fine sand sized (In) 0 00.182 0.00243 0.00308 (mm) 0.1223 0.0617 0.0782 .SOrtll'llll' . , , ,'I, .. V.Poor 2.387 0.244 2.078 Skewness Strongly·fine$kewed 0.694 0.971 0.534 Kurtosis Lepokurtic 0.295 0.719 1.142 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 67.36 26.39 6.25 32.64 Percentile Particle Diameter [Weight, %] [In.] [mm] [phi] 5 0.01421 0.36101 1.47 10 0.01172 0.29773 1.75 16 0.00996 0.25296 1.98 25 0.00819 0.20809 2.26 40 0.00611 0.15525 2.69 50 0.00494 0.12556 2.99 75 0.00144 0.03651 4.78 84 0.00059 0.01507 6.05 90 0.00029 0.00738 7.08 95 0.00011 0.00283 8.47 ) . Cbn!LIIIÌ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5025.1 Sieve and Laser Particle Size Analysis 100 25.0 80 20.0 ~ 0 ::: 15.0 ';fl. C) 60 ~ ~ c ~ II) :J :¡:; 0- «I 40 10.0 ~ "S E :J 0 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) . i.,'" ",';"" :";II~I,""'Päl(t(clij;Slzø[jlätrlbutl~ri'!",il",,··;"'I. '1'1" I :'I~:Ç' . : :,'1';, ~"I :. ,I,' "'I" .' i ", ~iatnØter'l i'l' ~;~.i,I,.,'I.,I: 1."1> "',,:,:',,; i ." ...'11........:, '.WlitIA.l:lt 0/,. ,,1)'.1.' Ii,' 'i'IL:JSMesI111' '11.lnnll,·'·,,'!,rmmtll" I' 1'·i¡f,dI'JI ',,' I:' nnctl·I.',.;" rtum:l 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ '2·ö...........Ö :Ö3'3'1·..·..·Ö :ä4ÖÖ......... ö: 25...· -.... ö·:öå......·...· ö: öä ..... Coarse 25 0.0280 0.7100 0.50 0.06 0.14 Sand 30 0.0232 0.5900 0.75 0.10 0.24 35 0.0197 0.5000 1.00 0.07 0.31 ........................ '4Ö·..... .....ö:ö 1'65...... Ö:42ÖÖ........ '1":25' ...·.....Ö:31...... .....ö: 62·.... Medium 45 0.0138 0.3500 1.50 0.93 1.55 Sand 50 0.0118 0.3000 1.75 2.11 3.66 60 0.0098 0.2500 2.00 3.79 7.45 ····················..···fö····· ·..···Ö:ööä3'····..Ö:2·1ÖÖ···.....·2:25..··-····'2·.64····..··..1Ö:Ö9···· Fine 80 0.0070 0.1770 2.50 6.91 17.00 Sand 100 0.0059 0.1490 2.75 9.02 26.02 120 0.0049 0.1250 3.00 10.53 36.55 ....................... '14Õ ........ ·Ö:ÖÖ41......· Ö:'1ö5Ö'" ......3:25·... -.. ..fö:š·t...·.. "'~r;: 12.... V. Fine 170 0.0035 0.0880 3.50 8.82 55.94 Sand 200 0.0029 0.0740 3.75 6.14 62.08 230 0.0025 0.0625 4.00 3.85 65.93 270 0.0021 0.0530 4.25 2.57 68.50 325 0.0017 0.0440 4.50 1.08 69.58 Silt 400 0.0015 0.0370 4.75 2.04 71.62 450 0.0012 0.0310 5.00 2.00 73.62 500 0.0010 0.0250 5.25 2.92 76.54 635 0.0008 0.0200 5.50 1.75 78.29 0.0006 0.0156 6.00 3.26 81.55 0.0003 0.0078 7.00 6.55 88.10 0.0002 0.0039 8.00 4.25 92.35 0.0001 0.0020 9.00 2.98 95.33 0.0000 0.0010 10.00 2.18 97.51 Clay 0.0000 0.0005 11.00 1.36 98.87 0.0000 0.0002 12.00 0.78 99.65 0.0000 0.0001 13.00 0.31 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 :,11 :,',,1,,:.; IISofthu:i!;St!ltlstlcs¡i~FQlk), d",;',','I,:11 '11',,1:':, :,1":', ':"":"I:,:,,:,,:,:,;:":I:I::I:":'::"';I '~i"~;..,,'./,,':I('i":"":""~:;'I)I::': I',·i I": ,I,,"':" I I :,: :!::,I:j~.t.m'et~~:,III:;:¡\::,;; :, ,,;," Xt¡å.'k?,::::!I:,: :,~::III~'rtI'allr'll ::': "::"::',,,:Fdlk!';'" ~ ,: I IIiI'Cllio' i!i..:.I,li:!:!..li,:, I!.li:lii,!!!.:!':ij·l¡:11:¡lllil,i'I,I:'!:!··.·.·.··,··,:\{.~I'.fini..·,âmtlll'¡¡¡' ze~:'~!I·:':.,:I..~:!·:':'i!··I,!·.·!·,I. (in) 0.0041 0.0041 0.0041 (mm) 0.1050 0.1050 0.1050 MÖäi1i. 1;"1,, 'i"" ·'1 ' i'I,.!',' ,Sn~'8I:11:td I' "I ,'I, ,',. (In) 0.00379 0.00187 0.00244 (mm) 0.0964 0.0476 0.0620 Sqrtll'lg,'·.··, Skewness Kurtosis '···V.póor" 2.333 0.242 2.082 , '1 Strongly fine skewed. 0.665 1.017 0.576 Lepokurtlc: 0.295 0.711 1.173 comrnent. Percentages Gravel I Sand Slit I Clay I Slit + Clay 0.00 65.93 26.42 7.65 34.07 Percentile [Weight, 'Iv] PartIcle Diameter [In.] [mm] [phn 5 10 16 25 40 50 75 84 90 95 0.01104 0.28048 0.00907 0.23042 0.00773 0.19632 0.00641 0.16282 0.00495 0.12561 0.00413 0.10497 0.00118 0.02992 0.00045 0.01154 0.00022 0.00553 0.00009 0.00220 1.83 2.12 2.35 2.62 2.99 3.25 5.06 6.44 7.50 8.83 ) . Cure I.ëIb BP Alaska MPS 261 Milne Point ') C.L. File #: 57111-103054 Sample ID : 5048.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 - ~ 15.0 "#. C) 60 ~ ~ c Q) Q) .~ ::J 1; cr :i 40 10.0 .t E ::J '" 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 'Pâi1lcl.SI:a:e~Dlstrl,6utlól"l~ \"/',; '," :1';1;::,;';' I::'"~ '~'!, 1~,,'DI~~Øt,,, ,r,:,:,,":,' ",I;;I':,:i"r,' ',' Ii :1,: "I,:" ",I,;i,I,'r"""',:,':'Wlèig, ~" t'~o'lli""!',"li, ,"II ',' I 'nnJ" : 1 ;,"rmm1: ' '""" " tlll'l,' ,':;;' ,'Incl. f[é, ",lrOum.l' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ '2·Ö........ ..Ö:Ö331....... ö:ä¡öö..·...... Ö :25·...-·... ·ö:ö·ö·..........ö: öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ...................... ...¡ò·....... ...Ö:ö1"6'5.....· Ö:¡2ÖÖ...... "'1' :25.... - .....ö·:ö·ö .......... Ö :ÖÖ..... Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ·....········..···....···fò· ······..··Ö:ööä3"·····Ö:21ÖÖ····..···2:25··..-·····Ö:Ö·Ö··········Ö:ÖÖ····· Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 1.29 1.29 120 0.0049 0.1250 3.00 5.57 6.86 ....................... ·14·Ö..........Ö :öö¡T...... Ö:'1 ÖSÖ......... 3:25·... - ...Tö:š4.......·:¡- 7 :¡Ö.... V. Fine 170 0.0035 0.0880 3.50 12.54 29.94 Sand 200 0.0029 0.0740 3.75 10.78 40.72 230 0.0025 0.0625 4.00 7.08 47.80 270 0.0021 0.0530 4.25 3.93 51.73 325 0.0017 0.0440 4.50 1.36 53.09 Silt 400 0.0015 0.0370 4.75 2.45 55.54 450 0.0012 0.0310 5.00 2.57 58.11 500 0.0010 0.0250 5.25 4.21 62.32 635 0.0008 0.0200 5.50 2.76 65.08 0.0006 0.0156 6.00 5.21 70.29 0.0003 0.0078 7.00 10.56 80.85 0.0002 0.0039 8.00 6.95 87.80 0.0001 0.0020 9.00 4.91 92.71 0.0000 0.0010 10.00 3.47 96.18 Clay 0.0000 0.0005 11.00 2.09 98.27 0.0000 0.0002 12.00 1.19 99.46 0.0000 0.0001 13.00 0.47 99.93 0.0000 0.0001 14.00 0.07 100.00 . Distribution prec!udes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 "'VI'" ',i: '1,,1 :I':,$oHih\J;!Statlstlcs (Folk),';' i" ,', ,'" "1"",1 ,1""1"'1'11'" , ',,' """1'""", ',1':"'1 ""","" I I,' 1.".1",,"1, '1'" "I'i',I, 1.,1 ( !, II : I, :11,,1, " ,1'1'" "I.:, I ,I 11':1" ,I' "'1" "1 ',I, ."11,, I I 'fl', 'i ,11'( I:,' ;,:' 'Påtåmetèr, , ,'It[rask,,',I,'h:unan /; ': : ',fblk, Mèdlân", ,'!";'II';I """,1,: I,'II'.',,':I;:',"::,!,;''''I'' $llt:~izêd ",1,111';: ',' ":1 "" , r (In) 0.0023 0.0023 0.0023 (mm) 0.0587 0.0587 0.0587 Mel¡!l'Ii, "''¡i,l'i' .'1,'";:<,, '¡$Hts,iz~d'l,i' (In) 0.00217 0.00098 0.00131 (mm) 0.0552 0.0250 0.0332 Sorting: Skewness, Kurtosis 3.010 y.,Poor 0.220 2.114 StronglY fine skewed 0.562 0.974 0.597 Platykurtlc 0.361 0.547 0.870 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 47.80 40.00 12.20 52.20 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phij 0.00550 0.13978 0.00494 0.12543 0.00447 0.11344 0.00391 0.09935 0.00307 0.07808 0.00231 0.05873 0.00043 0.01096 0.00022 0.00551 0.00012 0.00297 0.00005 0.00130 2.84 3.00 3.14 3.33 3.68 4.09 6.51 7.51 8.40 9.59 .. r.are1.al:Ï ) BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5052.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 .. .c 15.0 "#. æ 60 ~ ~ c ~ CD ~ 0" C'CI 40 10.0 £ "'5 E ~ (.) 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) [:pa,' rticle',SlzÐD, I' stdbcitlo,' ni~\ I ., ';',' '. \, '1'''' ~",.·~"II~I,' ", ",:" ;'\'1 ,.',.,., .". I . "I~!~rm ~~l~e",,; .'·~m·""I:·l" ,':', 'I' "',llr':""cII·:".~~III:'I";II, ;J"'Ii.:!filll'II'~'~~r'~t~W::l:,i.. 1 " l'I~US:'Me8hl; ,I" I, II.,," ,I m' I," ':,1, , ',1, ",' I'''" nlO. "",,1:, ,'""""" 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....................... ..iõ........ ..Ö:Ö331..... "Ö: ä4ÖÖ.........ö :25.... -... ·ö·:ò·ö.......... ö: öö··... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ 4·Ö·.....· ...ö:ö 1'6'5'" ...Ö:42ÖÖ........· r 25.... -.... 'ò':ò'ò'" ........ ö: ÖÖ..... Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ...................... ...7"Ò......... "ö:ööä3"" ...Ö:21ÖÖ..·.....· 2:25·... -.....ò·:öö·........· ö: ÖÖ..... Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.51 0.51 120 0.0049 0.1250 3.00 3.00 3.51 ··..······..···......···14·Ò·····..···ö:öö41·······Ö:·1ÖSÖ..··..···:3:25·..·-·..·"£3."9Ò···.... ..·:¡Ö:4:¡···· V. Fine 170 0.0035 0.0880 3.50 9.91 20.32 Sand 200 0.0029 0.0740 3.75 10.69 31.01 230 0.0025 0.0625 4.00 9.22 40.23 270 0.0021 0.0530 4.25 6.70 46.93 325 0.0017 0.0440 4.50 2.52 49.45 Silt 400 0.0015 0.0370 4.75 4.02 53.47 450 0.0012 0.0310 5.00 3.37 56.84 500 0.0010 0.0250 5.25 4.72 61.56 635 0.0008 0.0200 5.50 3.00 64.56 0.0006 0.0156 6.00 5.70 70.26 0.0003 0.0078 7.00 10.64 80.90 0.0002 0.0039 8.00 6.89 87.79 0.0001 0.0020 9.00 4.92 92.71 0.0000 0.0010 10.00 3.43 96.14 Clay 0.0000 0.0005 11.00 2.08 98.22 0.0000 0.0002 12.00 1.22 99.44 0.0000 0.0001 13.00 0.49 99.93 0.0000 0.0001 14.00 0.07 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ;',,, :.,;I,:",SóH:lng:Statlstics~Folk) I" . Î:' :"'..."I'·p~'r~~è*~~":':· .·I":.~~å~~,..· .... ,:,.:.IÏ1ni~~'I·', Medlån":'II!I:III',':':'II::li:II,',~III·,II';I,':¡'I; :'I;:'I"I:III~:."" ' 'S'Îltlslzêdi'I" (In) 0.0019 0.0019 0.0019 (mm) 0.0478 0.0478 0.0478 Meån II' ··',t,¡,'"Sl\t$lze~ (In) 0.00190 0.00092 0.00117 (mm) 0.0482 0.0234 0.0297 SotJ;lhg I V.POOI' 0.235 2.048 2.781 Skewness Strongly fh'l8skewed 0.643 0.909 0.532 Kurtosis Mesokurtlc 0.341 0.586 0.920 Component Percentages Gravel } Sand I Slit I, Clay I Slit + Clay 0.00 40.23 47.56 12.21 59.77 Percentile Particle Diameter [Weight, %] [In.] [mm] [phi] 5 0.00501 0.12723 2.97 10 0.00441 0.11197 3.16 16 0.00393 0.09971 3.33 25 0.00336 0.08543 3.55 40 0.00254 0.06453 3.95 50 0.00188 0.04776 4.39 75 0.00043 0.01104 6.50 84 0.00022 0.00551 7.50 90 0.00012 0.00297 8.40 95 0.00005 0.00129 9.60 ) .. CorE!lBIÏ BP Alaska MPS 261 Milne Point ) C.L. File # : 57111-103054 Sample ID : 5067.1 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 ::ë 15.0 ';f. æ 60 ~ ~ 0 c .~ CD ::I 1ã 0- :; 40 10 0 ~ E . U. ::I 0 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 'P8, ,,~I,~,I,ti,'S, It,,',,' ",D. ,I$,'~"r,', ,I"b, :"~, ,.t,I"Ø, ,', n" ",',",..,","',;,'11,',;':.', ),',,',i,',~..¡,!"', !U:,',I, : ":,,',','," "',,"';', ',', I' ",i "', "" . ',ill' I., "'I' ,',," IDI,.In,e~e~' ,1:i,;111 ".1 ;,,', "'I;,,:;,:,:,,'~:"I,¡j ,"'~'~Øhtl~¡;¡!I" '",,', "i"i, ~U6IMe$hl' : "" ,,,,',[,In;1: I :,: ,"Ihnml",. "', I ""II[,'cb:;'11,11':I,lil,I:',rihCIJ1:',!"",:,IFC¡,h"d"'I 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 .... ... ·....·············2·Ö··········Ö~Ö33r·····ö·.ä4öõ..······Ö:215····_··..·Ö:ÖÖ····..·..·Ö:ÖÖ..·.. Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 .............. ........ ··4Ò·········..Ö~Ör65·..···Ö:42ÖÖ..·..····1·:215····_··..·Ò·:ÖÒ····...····Ö:ÖÖ··..· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ........................ 7Ó·..··..··..ö~ööä3······Ö:21ÖÕ..······2:215····_···..Ò·.ÕÖ·..·..·..·Ö:ÖÖ····· Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.53 0.53 120 0.0049 0.1250 3.00 3.15 3.68 ........................ 1"4'Ò..·...·· "Ö~ÖÖ4' r..... Ö: ·1ösõ..·..... 3:215.... -.. ...7"."2·9.........1 ö: 97...· V. Fine 170 0.0035 0.0880 3.50 10.51 21.48 Sand 200 0.0029 0.0740 3.75 11.18 32.66 230 0.0025 0.0625 4.00 9.33 41.99 270 0.0021 0.0530 4.25 6.50 48.49 325 0.0017 0.0440 4.50 2.39 50.88 Silt 400 0.0015 0.0370 4.75 3.79 54.67 450 0.0012 0.0310 5.00 3.20 57.87 500 0.0010 0.0250 5.25 4.53 62.40 635 0.0008 0.0200 5.50 2.83 65.23 0.0006 0.0156 6.00 5.26 70.49 0.0003 0.0078 7.00 10.45 80.94 0.0002 0.0039 8.00 6.83 87.77 0.0001 0.0020 9.00 4.81 92.58 0.0000 0.0010 10.00 3.46 96.04 Clay 0.0000 0.0005 11.00 2.16 98.20 0.0000 0.0002 12.00 1.24 99.44 0.0000 0.0001 13.00 0.49 99.93 0.0000 0.0001 14.00 0.07 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ',":' ,:,1,1','1: 1,11" ' 1':'SºrtIM!;S«ltlistl~:'(~ºII() "\':,,',, ;'1, ,¡',: ';",:" ,'I~~~~~~t~f:,!",I:,I::,:',ii~~~~!:!;',~:::'I¡I~~~n':,1",lli::',"'.F~Î~'"",,::,, IMèØI~r:I,:III'I,..,"".:,'I,;I,'III,I.I:,,!I.,','I',11lil!,I'I':,II",:,,:.I"',":'I::,11 ':,I.:::SUt",slnl:t",'"II:',,";:I'I'i,i.i',i,'!"I:'I, (In) 0.0020 0.0020 0.0020 (mm) 0.0506 0.0506 0.0506 M,an' I , 'i,' I" "fr'.::'!" I'" I,SUt,sižëd' !I'i', (In) 0.00194 0.00093 0.00120 (mm) 0.0493 0.0236 0.0305 SOrting: Skewness Kurto$ls ' ',',I,t", ' ,,,iV.POOr' 2.808 0.234 2.060 I, 'Strongly fi¡'é s,kewed' 0.616 0.951 0.561 Mesoku~lc 0.346 0.591 0.918 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 41.99 45.78 12.23 58.01 Percentile [Weight, %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 2.96 3.14 3.31 3.52 3.90 4.31 6.50 7.50 8.41 9.64 0.00505 0.12815 0.00446 0.11334 0.00398 0.10115 0.00344 0.08742 0.00264 0.06702 0.00199 0.05057 0.00044 0.01108 0.00022 0.00552 0.00012 0.00294 0.00005 0.00126 ) .. Care t.ab BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5076.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ 0 ~ 12.0 ';/!. 0'1 60 ~ ~ (,) c .~ Q) ::s «1 0- '3 40 8.0 ~ E u. ::s U 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) . I., ~'~å\H:I~IØ Slz.:Dlst~lbotiön"",::, ',:,""....'{,,".':: . /,1 ( ,',. 'I'" " .' ,'. ',': Dla~'tf, " ':,: ·,'.1';;: ,:',:1. .,.1,,;,.'.', ';"", ,'I',,' I",', ,,','1' t',' ~~ g~t~.. ,",' ,.",'tUSM~$hl ' ·!'fln:l' ,," .,' :rmml,',:,';"~ ,dl1"'" ·'II"cl.1,1 );lrCu!ri;t 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....... ................ ..2'Ö.....·.....ö: Ö33r.....· Ö:Š4ÖÖ·..·..... ö :;g.... -.... ·Ö·:ÖÖ........... Ö: ÖÖ..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.19 0.19 35 0.0197 0.5000 1.00 1.90 2.09 ........................ :ïö·......... ö:ö 1'65...... Ö:42ÖÖ.......· T 25.... -·...::ï.'74.......·... ë :Š3..... Medium 45 0.0138 0.3500 1.50 7.65 14.48 Sand 50 0.0118 0.3000 1.75 9.50 23.98 60 0.0098 0.2500 2.00 9.07 33.05 .......... ··..····..·····fö··········ö:ööä3···..·Ö:21ÖÖ·..······2:25··.._··..·3.f3"S·....·····3ë:71·..· Fine 80 0.0070 0.1770 2.50 5.00 41.71 Sand 100 0.0059 0.1490 2.75 2.79 44.50 120 0.0049 0.1250 3.00 2.84 47.34 ······..············..··14·Ö·········Ö:ÖÖ41·..····Ö:·1ÖSÖ····..···3:25..··_··..4:7"9"·.....·..S2:13···· V. Fine 170 0.0035 0.0880 3.50 6.58 58.71 Sand 200 0.0029 0.0740 3.75 6.26 64.97 230 0.0025 0.0625 4.00 4.49 69.46 270 0.0021 0.0530 4.25 2.96 72.42 325 0.0017 0.0440 4.50 1.18 73.60 Silt 400 0.0015 0.0370 4.75 2.10 75.70 450 0.0012 0.0310 5.00 1.93 77.63 500 0.0010 0.0250 5.25 2.60 80.23 635 0.0008 0.0200 5.50 1.50 81.73 0.0006 0.0156 6.00 2.71 84.44 0.0003 0.0078 7.00 5.50 89.94 0.0002 0.0039 8.00 3.56 93.50 0.0001 0.0020 9.00 2.49 95.99 0.0000 0.0010 10.00 1.82 97.81 Clay 0.0000 0.0005 11.00 1.18 98.99 0.0000 0.0002 12.00 0.69 99.68 0.0000 0.0001 13.00 0.28 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ':'::'::",":'I:::';S~~II1J'~~tl~~~~:I~~I~)'. . , ,:',' ~.t~~~~~f;tl::::I,i::;t~ij~k':.,',:'I: 'ó'rri~:~,,:,.:: ,'I IF~lk I' M8~'lèh'I,··:;I:":;'·,·I'II:..:l : .',I':I"'I'I:i"',,'I'Veiý'tlrie ·'.I~( )IiI:IEe(J':,:,""·' " (In) 0.0047 0.0047 0.0047 (mm) 0.1193 0.1193 0.1193 Me_ij I '< '. I ~ ;,li"1 Sentlng: .Skewne.. Kurtoåls (In) (mm) 1 ,".,:,Ve!'Y"flne ""(tilzed " . 0.00668 0.00294 0.00344 0.1698 0.0747 0.0873 , '."11 'I V.~Oor'" 0.212 2.242 2.613 . Strongly fine. skewed 0.950 0.787 0.388 Me80kurtlc 0.322 0.661 1.098 Component Percentages Gravel I Sand I Slit I. Clay I Slit + Clay 0.00 69.46 24.04 6.50 30.54 Percentile [Weight. %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.01818 0.46187 0.01575 0.39998 0.01385 0.35177 0.01166 0.29617 0.00812 0.20615 0.00470 0.11926 0.00171 0.04338 0.00063 0.01588 0.00028 0.00715 0.00011 0.00269 1.11 1.32 1.51 1.76 2.28 3.07 4.53 5.98 7.13 8.54 ) . CørelBb BP Alaska M PS 261 Milne Point ') C.L. File #: 57111·103054 Sample ID : 5079.0 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 ~ 0 :: 18.0 '#. œ 60 "CD ~ 3: (,) c .~ CD ::J ¡; 0- "5 40 12.0 .t E ::J (,) 20 6.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) .,·,i;,':;!:::'·';I·.:;,I,:I.'.;" ¡Ii ':!!:'I!:,i:.'I:"i'iIPåt1¡(:,I!Î:.~li¡!!iþl~tt\Usû.IQni''" ¡"',',.", ',.,.,:,!,: !¡,~;\,IIII, ;'¡'::'!'~.¡:I;!I,'.';!',I:!!,',:"'!:!',II, ¡',I!,::',' .,:' ",! ,." ,',' ,:,1'1: ',I , I'!' ',I" :.Ç)la~~t(l~'I:"" ", .,:.:,;"'1; ':,' ,,1""'" I i:" '!, 'vv:e'Q~!t% 1','" , " ,,' "I,I,rUSMeshl', I,! I ',;"nlll;vll'II,I!lrltiml" ": ,,!".,"f"!dli'l, I" :"'nnld:1." 1!:'!llltc::um'JII, 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2·Ö" u.. ....Ö:Ö331......· ö :ä4öö...... ...Ö:25·... -... ..ò·:ò·Ô·.......·.. ö: öö ..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.14 0.14 35 0.0197 0.5000 1.00 2.08 2.22 ........................ '4Ö....... ...ö:ö 1·65...... Ö:42ÖÖ........ '1' :25·... -.... s·."6ä...·..·... 7: 9Ö..... Medium 45 0.0138 0.3500 1.50 9.75 17.65 Sand 50 0.0118 0.3000 1.75 12.86 30.51 60 0.0098 0.2500 2.00 13.32 43.83 ....................... ufô·...·...· ..Ö:ÖÖä3..... 'ö: 21 ÖÖ......... 2: 2~f"'-'" ..s·.ä"9........· 49: 7~r" Fine 80 0.0070 0.1770 2.50 9.02 58.74 Sand 100 0.0059 0.1490 2.75 5.22 63.96 120 0.0049 0.1250 3.00 2.60 66.56 ......·.........·.......14·Ò..·......·ö:öö4r·...·Ö:1ÖSÖ·.......·3:25...·-.....f.äT.........Šä:37...· V. Fine 170 0.0035 0.0880 3.50 2.35 70.72 Sand 200 0.0029 0.0740 3.75 2.95 73.67 230 0.0025 0.0625 4.00 2.95 76.62 270 0.0021 0.0530 4.25 2.45 79.07 325 0.0017 0.0440 4.50 0.99 80.06 Silt 400 0.0015 0.0370 4.75 1.64 81.70 450 0.0012 0.0310 5.00 1.38 83.08 500 0.0010 0.0250 5.25 1.89 84.97 635 0.0008 0.0200 5.50 1.12 86.09 0.0006 0.0156 6.00 1.96 88.05 0.0003 0.0078 7.00 4.05 92.10 0.0002 0.0039 8.00 2.74 94.84 0.0001 0.0020 9.00 1.98 96.82 0.0000 0.0010 10.00 1.49 98.31 Clay 0.0000 0.0005 11.00 0.93 99.24 0.0000 0.0002 12.00 0.53 99.77 0.0000 0.0001 13.00 0.20 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 '"I' ~'!""!i,II",; 1,.,'~øriinr;j:Statlstics' ~FQlkl' '!" 'I,:. ".1",,;,; ;' 1.1\ '1,. ,'I', 'I, "I ~ I',".i' I :- ,I' " I" "1"" "'I' I :"'.' ,'" ,": I',' .', I, ' I' ",' " ,'I' ~ I I', I' ,I " ' I I I" II' ,', ':' ,', ' ,1,1' I , , I . I " I",', "',""""I,¡,,'· I'III.I" "",II"":' 'II'WI II'''I,.I,."I",:":",..,,I 1:.,"1,"'1' :dll'"I"':I"I'I,·.'I,II'1 ""II,. Iii' .:P!åtaméterv:" ,: .'. !lråslC!,i, ',', ,,~Inmâri:'!': "".",Føik",;i" "1I/I_Cllan!ii' ·"1'1. I':I,+I':::!', 'III lil!"·I';I..II:',III':lilli,:!~i~ê'.I..ntll'~lzed:"'!1,:~illl,111 I (In) 0.0090 0.0090 0.0090 (mm) 0.2286 0.2286 0.2286 M.ean ;',1 )!i '",!,!II" '¡ '"I ',l;'ll1esal:idsIUdll"." (In) 0.00781 0.00415 0.00537 (mm) 0.1983 0.1054 0.1365 SQrting ¡ i, I Poør,1 0.283 1.972 2.139 Skewness strongly fine skewed 0.666 1.352 0.658 Kurtosis I Lepokurtlc 0.314 0.923 1.309 Component Percentages Gravel I Sand 'I Slit I Clay I Slit + Clay 0.00 76.62 18.22 5.16 23.38 Percentile Particle Diameter [Weight, %] [In.] [mm] [phil 5 0.01851 0.47005 1.09 10 0.01639 0.41629 1.26 16 0.01467 0.37270 1.42 25 0.01282 0.32554 1.62 40 0.01046 0.26565 1.91 50 0.00900 0.22855 2.13 75 0.00280 0.07116 3.81 84 0.00117 0.02983 5.07 90 0.00042 0.01065 6.55 95 0.00014 0.00366 8.10 ) .& Carl:! lBb BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5096.0 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 ~ 0 :ë 21.0 i!- Q') 60 ~ ~ c .~ C ) :s 1ã 0" :; 40 140 e E . u. :s 0 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) "',!",I:."I:",!" ,:!,; !,padi¢I','S, ',liltJ!:ÐI$, t¡'~bU, tJ, øni' i¡",' ',' i ,::i':";"",,',;:,,,,':':I,,' i ,,"';"',',,' ',', ,,"I' "".,I,Dla':""....·e~I',',' ":,,:,'.,I'!',,'i,'.',', 1',',",,':, ',I' ,"'," I WAlnWt~QI , '" I' " , ",.'I¡J,~ 'I" ," 'I' " 'I '" '"'' I "'1"'1';' "i~I;~",,/ll,r';~"':':'I~' ",Ii", 'l'rUSMè$hl' "ll¡rln:l"i"''f.....rn1,'::'"fcbl,'','I'i r nct, ," urn.I' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 .....,................ ...2·Ö..........Ö: Ö331.......Ö :š¡öö...... ...Ö:25...· _... ..Ö:Õ·Õ·.....·'... Ö: ÖÖ....· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 2.63 2.63 ,....".,..,..,..,....,. '4·Ó··..·'·'·' 'ö:ö 1·65'·'..· Ö:¡2ÖÖ......'· ·1":25·'.. -.... 'iää.....'·..·, 6: 51'·"· Medium 45 0.0138 0.3500 1.50 8.20 14.71 Sand 50 0.0118 0.3000 1.75 13.35 28.06 60 0.0098 0.2500 2.00 16.65 44.71 ....................... ..7Ö·.......· ..Ö:ÖÖä3...'.. Ö:2·1ÖÖ......... 2:25.... -... ·ä'.T 1....... "'52 :Š2..'· Fine 80 0.0070 0.1770 2.50 12.72 65.54 Sand 100 0.0059 0.1490 2.75 7.08 72.62 120 0.0049 0.1250 3.00 3.48 76.10 ..,.."..,.."....,..,. ·1'4·Ö'·'·'·.. 'Ö:ÖÖ41..'·'·' Ö: '1 ÖSÖ'·'....·' :3:25'..· -". ·"2".23....'·..· :¡Š:33·"· V. Fine 170 0.0035 0.0880 3.50 1.61 79.94 Sand 200 0.0029 0.0740 3.75 1.21 81.15 230 0.0025 0.0625 4.00 1.11 82.26 270 0.0021 0.0530 4.25 1.06 83.32 325 0.0017 0.0440 4.50 0.42 83.74 Silt 400 0.0015 0.0370 4.75 0.77 84.51 450 0.0012 0.0310 5.00 0.91 85.42 500 0.0010 0.0250 5.25 1.01 86.43 635 0.0008 0.0200 5.50 0.90 87.33 0.0006 0.0156 6.00 1.40 88.73 0.0003 0.0078 7.00 3.39 92.12 0.0002 0.0039 8.00 2.64 94.76 0.0001 0.0020 9.00 1.95 96.71 0.0000 0.0010 10.00 1.75 98.46 Clay 0.0000 0.0005 11.00 1.02 99.48 0.0000 0.0002 12.00 0.50 99.98 0.0000 0.0001 13.00 0.02 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 :' i:I'II'ii', "'," ,'I'; '''1,1 "SQ'iitinn Ståtlsflc¡(Flk\';, ',I, 'I ,,', ,',,","1 ,1',1:": ,,',., ',' ,";:'",'.',,'1 ";1 "'"I,',, ',I,I<,I~:,I' I,~,'~ ,) ":'I,"',.~,~i,:",;",,:., ':,., :,',: ,', ";',, I,:;' ,i ,I 'I~~ ",I~ 1,',',1: "II' ,", :,' : I ~ ':" ',.:'1 ',I :' I I :"!' II,',' '1,1-1: ,1'1'1,'''1''1" II:"~,I":~I,:,,,,:',II, " ,II,I,I,I:,~ I 1 I, \11'111',1', I,"III~I'", 1',1'1, ,11,11 :"1,,:,,:1(," ,,' ,~ :1; ! I," ,I', I,,' I ~ .,".,,' 'På'rameter;,,1 i !" !"íTråsk ,'I. . Inman :,'.' ""II.I"'Ôlk .' II ' . Midlan"',!:hl" '1·.I"",:::.I·"III"·i:!:!"i'I:"iil!II'II~:'!I'I'I';~ln')¡Iltlnâilz8i:i'!I!!,".I",:·".'·.¡":'" (In) 0.0093 0.0093 0.0093 (mm) 0.2373 0.2373 0.2373 Nleari,,::,.,;;, ',Iii,'· i'·"Fll'le:~åndslzed· (In) 0.00898 0.00502 0.00618 (mm) 0.2282 0.1276 0.1569 Sof'th,g Skewness Kurtosis 'PoOr' 0.359 1.802 1.484 Strongly 6neskewed 0.891 1.724 0.666 Very leþtokurtlc 0.222 1.373 2.524 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 82.26 12.50 5.24 17.74 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In,] [mm] [phi] 0.01816 0.46125 0.01562 0.39672 0.01399 0.35537 0.01236 0.31387 0.01043 0.26486 0.00934 0.23728 0.00561 0.14249 0.00180 0.04578 0.00045 0.01138 0.00014 0.00357 1.12 1.33 1.49 1.67 1.92 2.08 2.81 4.45 6.46 8.13 A CÞtI! I..Bb ) BP Alaska MPS 261 Milne Point ) C.L. File # : 57111-103054 Sample ID : 5105.1 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 ~ :'.'¡:i::II!"I!!' 0 I':' :111 :ë ::;' :1',11 18.0 '#- 0) 60 ~ I' ~ U C .~ Q) :s '1ã 0" :; 40 12.0 .t E :s 0 20 6.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ,':,:',', ',': i,., :':,I"",,:i:',' I"~ :, ',". '" ':,", "J,", P",ä, rt,' i, ,c:, lê,', ,s, ",I" 6' ,ø, ,,',IS,"~, ,",t""I"b" ',U,,'.',t, "I, O~:,',',,','''',:}:;,·.', ',',',"::"":~~,':',','~, ",",",',:,:','."', II:, li'",:",:":",,,,: i:,,1 "," I" ,'.'".i ':' ',I,' ,Dlaniete~,"1 ,:"':',"1'" 1,''','1'', ",",:,,',} '1:1': :, 'I' ,I, ,'I ""eldhtl~fiii:;:',1 'rOSI Me$hl {, 'i . il";rInll ,: ",i': ";rmml""'i '",."'Idi 11'1,1': ":lInC:l. [li'¡:"irdum~1" 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....................... ..2·Ó.......... 'Ö:Ö33 r..·... Ö:ä4ÖÖ......... Ö :25 ....-.... ·ó·:ó·ó.....·..... ö: öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ···········..··..·······"4ö····..····Ö:Ö1·65··· ···Ö:42ÖÖ·..···..T25··..-·····Ó·:ÖÖ·..·.....·Ö:ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.32 0.32 60 0.0098 0.2500 2.00 3.54 3.86 ...................... ...7"Ó..·....... ·ö:ööä3"..·.. ö: 21 öö......... 2 :25·..·-· ..."4:óT.......·..:; :Š:;..... Fine 80 0.0070 0.1770 2.50 12.29 20.16 Sand 100 0.0059 0.1490 2.75 14.55 34.71 120 0.0049 0.1250 3.00 12.07 46.78 ....................... ·14Ö········· ·Ö:Öö41··..··· Ö:1 ÖŠÖ·......·· :3:25.... -... ..7":33·..·····.. 54:"1"1..·· V. Fine 170 0.0035 0.0880 3.50 3.55 57.66 Sand 200 0.0029 0.0740 3.75 2.07 59.73 230 0.0025 0.0625 4.00 1.91 61.64 270 0.0021 0.0530 4.25 1.94 63.58 325 0.0017 0.0440 4.50 0.95 64.53 Silt 400 0.0015 0.0370 4.75 1.80 66.33 450 0.0012 0.0310 5.00 1.72 68.05 500 0.0010 0.0250 5.25 2.66 70.71 635 0.0008 0.0200 5.50 1.75 72.46 0.0006 0.0156 6.00 3.30 75.76 0.0003 0.0078 7.00 7.04 82.80 0.0002 0.0039 8.00 5.23 88.03 0.0001 0.0020 9.00 4.37 92.40 0.0000 0.0010 10.00 3.75 96.15 Clay 0.0000 0.0005 11.00 2.29 98.44 0.0000 0.0002 12.00 1.12 99.56 0.0000 0.0001 13.00 0.39 99.95 0.0000 0.0001 14.00 0.05 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 i"il" ',',i:' ,'I",illi',,":\\,iiS~~inp"$ijltlstlcsli(Fql\(),"':,,':¡"1'·1' li."""I'i "',' "I' ' ,:,,' ," :" :""" II"',,: "'I"·"'" ,',:" '," ,,'" ,',I":' I ,: ,I' ,..' , ",',', ", I,' 'I' " .' I, ,"i: "'pà't~ffietet'I(I~:", I:,~~.ik ,,'i ,lri~è'ri"!¡:i",:'I'~~lkl:':: M~lån'I'!i.lIIIII,.,·'.',,¡I,",:I,II'I:I:,I:I:"¡I:''''',¡I:,'::I,',,''''~',fl¡lj'lään~llsl2!eClJII; I'i '" ¡I (In) 0.0049 0.0049 0.0049 (mm) 0.1243 0.1243 0.1243 Mean'" " Sortino'; Skewness Kurtosis ",i", "Ii,:'" ,:"::<'" ,'; ,$IIHJli'd,' (In) 0.00387 0.00140 (mm) 0.0983 0.0357 Ii 1':,:<1",1''', ," I'II:',!,';I,'I 0.00213 0.0541 3.331 'V.'Poor" 0.176 2.407 'Strongly f!I1,8skewed , 0.436 1.127 0.730 Platykurtlc 0.375 0.519 0.899 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 61.64 26.39 11.97 38.36 Percentile [Weight, %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.00966 0.24534 0.00874 0.22203 0.00798 0.20273 0.00710 0.18041 0.00584 0.14838 0.00489 0.12426 0.00064 0.01626 0.00025 0.00628 0.00011 0.00291 0.00005 0.00125 2.03 2.17 2.30 2.47 2.75 3.01 5.94 7.32 8.42 9.64 . CÞreLatÎ ) BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5144.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 ~ .s::. 15.0 ~ æ 60 .¡ ~ 3: u c CI) CI) > :J ~ tr 'S 40 10.0 ~ E :J (.) 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) , ',:, l~älitic eiIISlzeIDI8t~IÞuttøn 1::lil,:III'I,": : ",,! ,'1;' '! 'I" ,. "','1"",:",,: I,r'u', "'~""",M:i:':;$"h:'l'"'' ~1,an1è~r,' 'I:'::'! ":1,1",1,: ""II·I":'II":'¥V~'g~t:~~::":,;1 ,.' 0.. :" I ! nn.ll ',": I,' 'rmm1"",II' ,"I'rill!,]':,I:, "II:':,llrlncl!l,I'I,'I" ,'rCumil' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 . ................ ········2Ö··········Ö.'Ö33r..····ö·.ä4ÖÖ····..···Ö:25....-··..·ö:3S·......···Ö:3S····· Coarse 25 0.0280 0.7100 0.50 0.25 0.61 Sand 30 0.0232 0.5900 0.75 0.31 0.92 35 0.0197 0.5000 1.00 0.04 0.96 .............. ······..··"ð;Ö..···....·Ö.'Ö1"65······Ö:42ÖÖ······· ··:¡:25··..-···..Õ·.22.'·······..·"1:"1ä....· Medium 45 0.0138 0.3500 1.50 0.27 1.45 Sand 50 0.0118 0.3000 1.75 0.23 1.68 60 0.0098 0.2500 2.00 0.33 2.01 .......... ............ ...7"Õ........· "Ö.'ÖÖŠ3"'·" Ö:2'1 ÖÖ......... 2: 25....-.. ...Ö:36·.....·...· 2: 37....· Fine 80 0.0070 0.1770 2.50 1.83 4.20 Sand 100 0.0059 0.1490 2.75 4.57 8.77 120 0.0049 0.1250 3.00 8.18 16.95 ············..····..····1·;,;Ö···· '·"'Ö.'ÖÖ41' ······Ö:"1öSÖ····....·3:25····_····1Ö·:Šg······..27:äö·..· v. Fine 170 0.0035 0.0880 3.50 10.96 38.76 Sand 200 0.0029 0.0740 3.75 8.76 47.52 230 0.0025 0.0625 4.00 5.95 53.47 270 0.0021 0.0530 4.25 3.97 57.44 325 0.0017 0.0440 4.50 1.61 59.05 Silt 400 0.0015 0.0370 4.75 2.90 61.95 450 0.0012 0.0310 5.00 2.78 64.73 500 0.0010 0.0250 5.25 4.02 68.75 635 0.0008 0.0200 5.50 2.41 71.16 0.0006 0.0156 6.00 4.18 75.34 0.0003 0.0078 7.00 8.28 83.62 0.0002 0.0039 8.00 5.63 89.25 0.0001 0.0020 9.00 4.12 93.37 0.0000 0.0010 10.00 3.11 96.48 Clay 0.0000 0.0005 11.00 1.94 98.42 0.0000 0.0002 12.00 1.09 99.51 0.0000 0.0001 13.00 0.43 99.94 0.0000 0.0001 14.00 0.06 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 "."""""'1""',"1"','" "";""""":..6'..... ",'.,15't' "6'" tl.....' ,~~ L;:\'I'" :1""" I"",: I"" 'I"" i::., '! !~,I 'I', i II;':: I';;i .I! I': :!~ I.,,:, '; I ,"1 i'''~ll u,' ,n r I' at: 8 ~:!, r:,u I\~ ,:'1:, ¡, .', I' I:, I"~ ,:': , I :' I'l" ;', '...1 .'11:::' :"'~ I "I:~ I ~I\;~,,:', ;';):/!'I: :~\~I:':';:,'::I,;,I:I'I:,',',',' ':11;(::':' :,I,,;,::,:::I~:::.,' ": ",ii,':;,.',,'·, :~:::: I ,;'.,:,;,:I~'¡I,I:'"'~,',,,,:I ':';~::', ;'~,::'i:;'I',;~" :,,':1 ,;,:',' ","I,'P:~lrärtlétër.'I; 'I, : I'Tr:as~,I, '¡'",I Inmål'll"'",I;1 ,I' "r:,ólk:': 11,1 ! 1I.:I.n:,:::.,::,!:I,:il!!. 'I'!:.·.·.!I ,!",I;;!li,l:'!I:,I!:II:I.'III¡'I'i';¡I:.I'i:'i.:I'¡i¡':!:Me~!,f nl;liïmd;I,8 *8d;,II!I:,!!i,¡!I.'!:I:I,,·.,:i..!, (In) 0.0028 0.0028 0.0028 (mm) 0.0720 0.0720 0.0720 ,Meani,"':'!:,,,!:,,:, I (In) 0.00259 (mm) 0.0658 Sortll'lD Skewne.s . Kurtosis Silt sized 000121 000161 0.0307 0.0408 ,·V'.Poc:it 2.743 0.226 2.134 , I ' .Stronglyflneskewed 0.588 1.003 0.593 Mesokurtlc 0.332 0.635 0.987 Component Percentages Gravel I Sand I' Slit I Clay I Slit + Clay 0.00 53.47 35.78 10.75 46.53 Perçentlle [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phn 0.00725 0.18423 0.00610 0.15488 0.00534 0.13566 0.00457 0.11613 0.00356 0.09030 0.00283 0.07197 0.00061 0.01543 0.00027 0.00695 0.00014 0.00345 0.00006 0.00143 2.44 2.69 2.88 3.11 3.47 3.80 6.02 7.17 8.18 9.45 '\ } . [þre lBb BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5153.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 :::e 0 :ë 12.0 '#- C) 60 ~ >; u c Q) Q) .~ ::J 1û 0" '3 40 8.0 e E LL. ::J 0 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) .'~' , ..' ':..1" ",':':I';fI!å~lcleSI!Zö¡;ÞU~t"ibijtibn'; ..' ..:"":ll'I!'I~:.,."'I!I'11 I ,,' "',,' ',; Diameter ",I ,"',' ., :'," :""',, '."'.,'1 "i,,:,, .1 '. ""I 'we~~h~% I, "... ." .'. ,.:,' · 'rusMéshl," 'rI";l' "11':' I rmm~.II.,lrll"r"~I; ",,', ""!nn'çl;l!':' 1:,II,::.rcuh:.la",: 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ..................... ····2·Ö·····..···Ö:Ö331·······Ö:ä4öÖ···....··Ö:25····-··..·ö:rg····..·..· 'Ö:'19"'" Coarse 25 0.0280 0.7100 0.50 0.40 0.59 Sand 30 0.0232 0.5900 0.75 1.73 2.32 35 0.0197 0.5000 1.00 3.06 5.38 ................. """'"4'Ò"""""'Ö:Ö1'65"""Ö:42ÖÖ""""'1':25"..-··..·;,,·.äS·..·······'1Ö:23··.. Medium 45 0.0138 0.3500 1.50 6.66 16.89 Sand 50 0.0118 0.3000 1.75 7.84 24.73 60 0.0098 0.2500 2.00 8.47 33.20 ........................ ·fö·..···..· 'Ö:ÖÖä3''''''Ö :2'1ÖÖ"""'" 2: 25"" -... ..;,,·:36·..··..·· ·37:56.... Fine 80 0.0070 0.1770 2.50 8.79 46.35 Sand 100 0.0059 0.1490 2.75 8.35 54.70 120 0.0049 0.1250 3.00 7.10 61.80 ....................... '1"4'Ö""'" "Ö:ÖÖ41"""'Ö: '1Ö5Ö"""" '3:25"" -... ··5·."2·8·..··..··· 67: öä"" V. Fine 170 0.0035 0.0880 3.50 3.66 70.74 Sand 200 0.0029 0.0740 3.75 2.76 73.50 230 0.0025 0.0625 4.00 2.51 76.01 270 0.0021 0.0530 4.25 2.49 78.50 325 0.0017 0.0440 4.50 1.20 79.70 Silt 400 0.0015 0.0370 4.75 2.23 81.93 450 0.0012 0.0310 5.00 1.92 83.85 500 0.0010 0.0250 5.25 2.34 86.19 635 0.0008 0.0200 5.50 1.24 87.43 0.0006 0.0156 6.00 2.08 89.51 0.0003 0.0078 7.00 3.62 93.13 0.0002 0.0039 8.00 2.27 95.40 0.0001 0.0020 9.00 1.67 97.07 0.0000 0.0010 10.00 1.31 98.38 Clay 0.0000 0.0005 11.00 0.88 99.26 0.0000 0.0002 12.00 0.51 99.77 0.0000 0.0001 13.00 0.20 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 .".;,I."',II":I·'iii""',!"!:So~lh~!Stiltl$tl$'~Fôlkl"'" "'1.. ;i, :,"i"i' 1:,'1. ,':"" 1,,1," ",,' ,I" I, II"' :'1·' ""',,, \ ,'" i" 111,11.': II, ',I "1,1,'·'1 " I I I 1,li:, ~~~~~t~F,I:'I,II:i~ä~'~",'!.lri~¡¡'h".I,1 I'I Folk I, ,M.alfjnli¡'!'?II¡I,I;:"I:!I)¡'::'!I'i:!:':::'!'I¡II"!'Ijllli:':i:¡':i!¡I':",lli!::FI'ne'såñlsl'zea'!!!'li::1".li::¡j'::1 (In) 0.0070 0.0070 0.0070 (mm) 0.1772 0.1772 0.1772 M,a." I'" ,1'.1', f1'ii'te,s8r'1dsized I,,' (In) 0.00727 0.00438 0.00512 (mm) 0.1846 0.1113 0.1300 SortlÄg Skewness Kurtosis ,I ·ppor'. 0.300 1.920 2.083 Strol'lgly'fll'leskewed 0.813 1.086 0.465 Lepokurtic 0.272 0.999 1.343 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 76.01 19.39 4.60 23.99 Percentile [Weight. %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] [phi] 0.02095 0.53203 0.01724 0.43800 0.01460 0.37082 0.01182 0.30011 0.00861 0.21861 0.00698 0.17722 0.00272 0.06915 0.00132 0.03342 0.00054 0.01365 0.00017 0.00433 0.91 1.19 1.43 1.74 2.19 2.50 3.85 4.90 6.19 7.85 ) .. Cure I.Bb BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5155.1 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 ..; s:. 15.0 ?ft. œ 60 iii >; ~ 0 c Q) Q) > ;:, ~ C" 'S 40 100 ! E . LL ;:, (.) 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) "1,1,1 Partlc e"Slze Dlstrlbutl0nl,I;II'" ,';'" '" ,'III',. ," 11':'/,1 "'I' ,' ',,': '. I. .' ,Dlamoter, ,."',',.,,¡. ',i'.. ';:',.'",,1 ",I, I., ',' Wèlght,~1o ',i, " "I.' ,ruS:Meshli II,,"! ,rlnl;1'1 ",I:rmnHIII",'llrlibl"il,I" I; (lncl;l" , ". 'rCumïlll 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ...................... ...2·Ò·...·...·..Ö :Ö331""·.... Ö:ä4ÖÖ'" ...... ö: 25.... -.. ...ö:2·å..·....·... Ö: 2Š·.... Coarse 25 0.0280 0.7100 0.50 0.87 1.15 Sand 30 0.0232 0.5900 0.75 1.64 2.79 35 0.0197 0.5000 1.00 2.36 5.15 . ........... ..... ·······¡Ö··· ·······Ö:ö1"sŠ·....·Ö·.42ÖÖ..·······1·:25·..·_···..3:Š4....··....ä:69····· Medium 45 0.0138 0.3500 1.50 4.70 13.39 Sand 50 0.0118 0.3000 1.75 5.73 19.12 60 0.0098 0.2500 2.00 6.98 26.10 ...................... ...7"Ò...·· ......Ò·.·ÖÖä3.....· Ö::¿·1ÖÖ.........2 :25.... -. "':ròã" ....... 3Ö :"iä...· Fine 80 0.0070 0.1770 2.50 9.21 39.39 Sand 100 0.0059 0.1490 2.75 9.90 49.29 120 0.0049 0.1250 3.00 9.10 58.40 ...................... ..14·Ö...... "'ö:öö4 1""..... Ö:'1 Ö5Ö......... 3:25·..· - .....7':Ò6·......... 65:46·... v. Fine 170 0.0035 0.0880 3.50 4.76 70.22 Sand 200 0.0029 0.0740 3.75 3.19 73.41 230 0.0025 0.0625 4.00 2.46 75.87 270 0.0021 0.0530 4.25 2.14 78.01 325 0.0017 0.0440 4.50 0.99 79.00 Silt 400 0.0015 0.0370 4.75 1.80 80.80 450 0.0012 0.0310 5.00 1.60 82.40 500 0.0010 0.0250 5.25 2.13 84.53 635 0.0008 0.0200 5.50 1.24 85.77 0.0006 0.0156 6.00 2.15 87.92 0.0003 0.0078 7.00 4.10 92.02 0.0002 0.0039 8.00 2.61 94.64 0.0001 0.0020 9.00 1.90 96.54 0.0000 0.0010 10.00 1.56 98.10 Clay 0.0000 0.0005 11.00 1.05 99.14 0.0000 0.0002 12.00 0.60 99.74 0.0000 0.0001 13.00 0.23 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 1.¡:i,II.'I"·"'i ,.:.",I¡i:II'II ".$~~ln~'Statl$tlës;fFQI~}i,,"';I';"¡i..,,;.:,.,'.!::¡','·'I::' :':,"I:~'I: ::,:" 1;".'::::'1::'::': :¡';':.~:::::: ~',,:'::': :1:'1::'1':: 1',:' ',:I"I",::':',I~';" ',;:' 'pi 1:,,':,:'; ",:'" :":'.:"':1;"':;,"'1:;"';': I',I',~':''',;','~ II' :,,;':I:,I,~":i'::I."':';: ,:,: I" .,'~aramête"I"'. ,.'. "!''1irrask' I;' ,I, ,·.Inman' ., '·",,'1, Folk:," Medliri!I:,i!i, ;lil':,;I!,,::II,i!I:,II::,!,IIIII';I:1'111;1,'I.:'I"iil¡,I"II,iF:l:n8isåntf,lšIZijd'I!,I.:I'::,111'·!.!.:I;'IIII'·!i" (In) 0.0062 0.0062 0.0062 (mm) 0.1575 0.1575 0.1575 Mean,· '·1':' 'i"èrÿ,flriøsåndislzlild"<'· (In) 0.00645 0.00378 0.00446 (mm) 0.1637 0.0961 0.1133 Sorting' Skewness Kurtosis I Poor' 0.289 1.995 1.940 I' Stn:.nglY flne,sl<ewed 0.847 1.057 0.460 ,I Veryleptokurtlc 0.237 1.031 1.557 Component Percentages Gravel I Sand I Slit I, Clay I Slit + Clay 0.00 75.87 18.77 5.36 24.13 Percentile l.Welght, %] Particle Diameter [In.] (mm] (phI] 5 10 16 25 40 50 75 84 90 95 0.02074 0.52688 0.01623 0.41216 0.01307 0.33196 0.01019 0.25876 0.00746 0.18939 0.00620 0.15750 0.00271 0.06872 0.00109 0.02780 0.00042 0.01057 0.00013 0.00342 0.92 1.28 1.59 1.95 2.40 2.67 3.86 5.17 6.56 8.19 ) .. Cbh:!LaIii BP Alaska M PS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5185.1 Sieve and Laser Particle Size Analysis 100 20.0 80 16.0 ~ 0 ..,;- s: 12.0 '#. m 60 .¡ ~ ;: u s:: CI) CI) > ;::, ¡ 0- "S 40 8.0 e E LL ;::, () 20 4.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 , " """,1, ,:,'I,.~""\""" ,,'.",",' , ,:1' O'~!'!ma~le~~~il'~I~~:I:,~i~t T~b~,,; ~~~":"'I' :\'i':'~I~"'II·~ht, Ol '" I', 'I i i",' '''I:', ~",,¡. I I '," """ ,""~, "':'''''",',',1 I II"I~I',:", "',",'":,1",,,,,,",',',.,:,:I',',:I"',I"",','~I'I,,I',' ',,',', :,'¡",J : II,"~I, ",,', ""', " ,', ,1,fO, I. ";'II' ::J,: '. '[USIM~stlll ' " , , rlh.l' I ',",'rrn'rn1'1,'1 ,,'[lcb1:1' i"nncl:'~I,'tS:unM': 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 ' 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 .............. ····....···2ò'·..·····..ö:ö3'3'1""·····ö:ä¡öö·········Ö:25···· -·····Ö:ÖÖ·....·..··Ö:ÖÖ····· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.01 0.01 .......·.....·.........·¡·Ö.........·Ö:Ö1"6S......Ö:¡2ÖÖ.........r25·...-·...·Õ·.61..........·Ö:62..... Medium 45 0.0138 0.3500 1.50 2.21 2.83 Sand 50 0.0118 0.3000 1.75 4.60 7.43 60 0.0098 0.2500 2.00 7.17 14.60 ..................... ....7'Õ..... ......ö:ööä3'.....· Ö:21ÖÖ........· 2: 25...· -.... ¡·:32...·.....·1 ä:92"" Fine 80 0.0070 0.1770 2.50 9.19 28.11 Sand 100 0.0059 0.1490 2.75 8.69 36.80 120 0.0049 0.1250 3.00 7.20 44.00 ...................... ..14·Õ........ ..ö:öö41""..... Ö:·1 ÖSÖ......... 3: 25·... -.... ·5.46......... 49:46.... v. Fine 170 0.0035 0.0880 3.50 4.04 53.50 Sand 200 0.0029 0.0740 3.75 3.11 56.61 230 0.0025 0.0625 4.00 2.56 59.17 270 0.0021 0.0530 4.25 2.31 61.48 325 0.0017 0.0440 4.50 1.13 62.61 Silt 400 0.0015 0.0370 4.75 2.26 64.87 450 0.0012 0.0310 5.00 2.27 67.14 500 0.0010 0.0250 5.25 3.43 70.57 635 0.0008 0.0200 5.50 2.23 72.80 0.0006 0.0156 6.00 4.38 77.18 0.0003 0.0078 7.00 8.65 85.83 0.0002 0.0039 8.00 5.28 91.11 0.0001 0.0020 9.00 3.55 94.66 0.0000 0.0010 10.00 2.49 97.15 Clay 0.0000 0.0005 11.00 1.54 98.69 0.0000 0.0002 12.00 0.90 99.59 0.0000 0.0001 13.00 0.36 99.95 0.0000 0.0001 14.00 0.05 100.00 . Distribution precJudes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ':Sb'ttln~!Ståtl'åtl~JFolkl' ,:I~, ,1,1," ,,' I' I" ", 'I" I :" :"". ';1' "1,,1:, ,11.',1 "':1' I " : ,I' '" I, 'II"', I 'I" I:: ': II :",;",', '."1'1' " ,,"1,' \~","I: :' I ·1 I::::<.:'.:~:,; p~~ij~lijt~tll: ,:::.i~: :.::' :::'!/':T~ä!i,~ ::1 :1.:: ':,1'.:' i'II~~~I~'. :.'JII:)I, I.: ': I:'·~~'I~~:, ",\' :;11 Mlialän'I"I"I,!"'¡L:I'II"I!i':I,~ ¡I¡:'I'ill::I".'!II,;V"êlVflnês~"ðl'slzjt:li'II"!.I,' i,'11 (In) 0.0043 0.0043 0.0043 (mm) 0.1084 0.1084 0.1084 Mean 'I!", .,'11 "I i;[III,,' I" 1,,:,¡'I¡,'I$lItlsl;i;.d:/i 'I,,;,i "¡:,I. (In) 0.00436 0.00181 0.00241 (mm) 0.1108 0.0459 0.0611 Sorting' , I y;,pobr"., 0.188 2.338 3.375 $keWrlè88, Strongly fine skewed 0.557 0.884 0.543 Kurtosis PlatYkurtlc 0.336 0.546 0.872 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 59.17 31.94 8.89 40.83 Percentile Particle Diameter [Weight, %] [In.] [mm] [phi] 5 0.01293 0.32839 1.61 10 0.01108 0.28135 1.83 16 0.00962 0.24447 2.03 25 0.00802 0.20372 2.30 40 0.00582 0.14793 2.76 50 0.00427 0.10845 3.20 75 0.00070 0.01788 5.81 84 0.00034 0.00861 6.86 90 0.00017 0.00444 7.81 95 0.00007 0.00186 9.07 -) .. DJte lI!ItÎ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5214.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 .; .c 15.0 "#. 0) 60 ëj) ~ 3: (J c .~ CD ::::J -; tr "3 40 10.0 æ E ::::J 0 20 5.0 o 4.0000 1.0000 0.2500 ;:::,;1 : :', :il":,;I",1 1:/;;",..',,:':: ,',,', ,I{",'''' I'" :;"':1 1':l!Iiå'"'i'cle':'Slzl:Ii mll"'t.:lilbl'it"lðn"'I,,;'j"'I'I:""""':""":'::':'I,'I':""i"''''':I'',''I';I',''''::::I,:'''';''",::'I''II'I"~ ',',:, ',(' '{I,:i",,',:",.:,,":,:',r,,",:'.,D""'~¡,,¡, I: Itt , ',,','~: .,'~,',,' .~i,.,.~,:'".f!,' ~"I, '~,""'" ,'J","í"".·..'" 1,1"'W':" ,,'" 'I' ~,';,~:~,",·'.·,:",'I,·.,~',";I 1',:11 I,' ;""'. ,·1.',1,',", ;"1' ,;"1,1 1,lc...~e ~rl"I" ,:II"I,.I'",.;I",I'II,III,: I.,,:d, IIII:",:,~II:"'III .1,1 '1""·",1.:,' I ,e Q~I'~~"" P", '11'/1., I; I, ;'(U$M~$hl:" I':" ,I'rhtr' :,','rn1in¡"I'II""'II"'~'illlll'lli::"'fI"bU"': :,·r t¡'rnll" 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2·Ó...····..· ·Ö:Ö331·····.. ö: ä4ÖÖ·..······ ö: 25···· -... ..ó·:ó"ó··..····..· ö: öö·..·· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.02 0.02 35 0.0197 0.5000 1.00 1.27 1.29 ....... ·················"4Ó· ········..Ö:Ö1·gg······Ö:42ÖÖ·········1·:25··..-····I·79···..·····s:öä····· Medium 45 0.0138 0.3500 1.50 6.96 12.04 Sand 50 0.0118 0.3000 1.75 9.95 21.99 60 0.0098 0.2500 2.00 11.60 33.59 ........................ ·7Ó..·...·.. ..Ö:ÖÖŠ3..... 'ö: 2'1 ÖÖ......... 2:25 ....-... ..S:Š1...·..·... 39: 4Ö.... Fine 80 0.0070 0.1770 2.50 10.40 49.80 Sand 100 0.0059 0.1490 2.75 7.96 57.76 120 0.0049 0.1250 3.00 5.46 63.22 ..................... ...1'4Ö·...... "ö:öö41'''' "'Ö:'1 ÖSÖ·........ 3:25 ....-... ..3".65.........· 6frä:;...· V. Fine 170 0.0035 0.0880 3.50 2.68 69.55 Sand 200 0.0029 0.0740 3.75 2.19 71.74 230 0.0025 0.0625 4.00 1.84 73.58 270 0.0021 0.0530 4.25 1.60 75.18 325 0.0017 0.0440 4.50 0.74 75.92 Silt 400 0.0015 0.0370 4.75 1.42 77.34 450 0.0012 0.0310 5.00 1.41 78.75 500 0.0010 0.0250 5.25 2.12 80.87 635 0.0008 0.0200 5.50 1.32 82.19 0.0006 0.0156 6.00 2.53 84.72 0.0003 0.0078 7.00 5.36 90.08 0.0002 0.0039 8.00 3.51 93.59 0.0001 0.0020 9.00 2.45 96.04 0.0000 0.0010 10.00 1.81 97.85 Clay 0.0000 0.0005 11.00 1.16 99.01 0.0000 0.0002 12.00 0.68 99.69 0.0000 0.0001 13.00 0.27 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 l'i:\I;:,:;,:,I,:,;,",,;I": '~ol1iI19'$t.tl$tl~'~F:QlkF I, ',,' ,1"11:1'1, I': ,: : ' :' I, ',~ " ." ,,'ll':' ,II· Î , , :, I,' ,:"" " III 'I 'II , " , : I '.:,,.1,' "", ,: "I'~ ", " " , ,I" ',; ',I, I,' '), "·1' ", I.' : ,'I I I. I I' 1II",I'il.II~III';II~'I'IIII,I"II~'I' 'I 1,'111 "I: II' ,I:, ,1'1,1'" I'II:~I,I"~I "II,;,; II ,.",' ,I' ',; I 1\111,',1 ,1,,11' :,IIII"I~','I' '1'1.1. 1",;1 ,', '.'''''åiram~tlr' ,,,,:. "II :frâs (III"I,lnmån,1 ~,'~',II'II'lfd k.',· " ~~al~~':"I~I;"',"'!'I'~~I:I':I'I':I.I'I'I'i .·,",I'il:"!I"II::,.'..Fln'e':.s'anCl,slzeij'I"':II::111:1 .'I¡'ili; (In) 0.0075 0.0075 0.0075 (mm) 0.1907 0.1907 0.1907 II,hiåij··, Ii:: <."..'....'¡' I·'¡.~il". ·'··'1., .,,',;,,',1 I,: Very'fln.lianCi,,:.lzed..i,..!·,,·:; (In) 0.00675 0.00293 0.00401 (mm) 0.1713 0.0744 0.1019 Sorting Sk.~Î'lø8S Kurtosis 2295 V.Poor o 222 2 194 ·IStrol"lgly fine skewed 0.658 1.135 0.649 Lepokurtlc 0.313 0.685 1.251 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 73.58 20.01 6.41 26.42 Percentile [Weight, %] Particle Diameter [In.] [mm] [phi] 5 10 16 25 40 50 75 84 90 95 0.01716 0.43586 0.01497 0.38019 0.01320 0.33526 0.01134 0.28796 0.00896 0.22747 0.00751 0.19066 0.00215 0.05469 0.00065 0.01653 0.00029 0.00731 0.00011 0.00274 1.20 1.40 1.58 1.80 2.14 2.39 4.19 5.92 7.10 8.51 ) . Carl!! .... BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5223.9 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 '#. :ë 21.0 '#. æ 60 ~ ~ c .~ (\) ~ êã D" :; 40 140 e E . 1.1. ~ (,) 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) :1,.',,),'1 ",',',1'11, ',",., "',::,¡'I'~,!':':'I,;:;I, ":1, :, :III'I,',';I","~,.~, .:a"'riIC,,, I' ~, II,'S, ",'2, ij,"¡:,Ð".'I~,',·, tr,I~,',4,'t,I~, ", :I,?,!I!".I,'í:,:'I;li,',',il¡,"'11,:",,1,', ':,~,",!',I,I,'I,'i,"I,.,I,i, li,II,!I"":II",,:;:.'.11 ,: ,',.' ',!! ",'," .'.. ,:1"" ".,', ,1',',¡~,IDlal1:le~'r,i"" r",!!:"\I'I" ',"11 !,,', ,":! .',.., ¡I 11111¡",w'~ia~~I%\, I," ,,' ",.' .,,". I 1""rl:lS,Meshll'i"'" '1'1' nn~l' """",'rrri'm~', "'i'II'I,I~'iblll"i"1 11"tloc 1''I,' II'raílm~11 II 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 . ·..··..················"2ö····..·····Ö:Ö331··..···ö:ä4öö··......·Ö:25·..·-..···Ö:Ö·Ö·..········Ö:ÖÖ····· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 2.30 2.30 ........................ ·4Ö········· ·Ö: Ö 1"65····.. Ö:4"2ÖÖ·....··..1: 25··.. -... ..7:45·..·..·..· 9: 7S....· Medium 45 0.0138 0.3500 1.50 13.11 22.86 Sand 50 0.0118 0.3000 1.75 16.20 39.06 60 0.0098 0.2500 2.00 14.87 53.93 ..............·..·.....··.,·Ö...........Ö:ÖÖä3..·...Ö:"2·1ÖÖ........·2:2S....-·...·5·:å'f.........S9:74.... Fine 80 0.0070 0.1770 2.50 7.82 67.56 Sand 100 0.0059 0.1490 2.75 4.07 71.63 120 0.0049 0.1250 3.00 2.32 73.95 ..................... ...14Ö...·.....Ö: ÖÖ41".....· Ö :'1 ÖSÖ·........3: 25...· -.. ..T.ä·.,......... 7 ~rä2"" V. Fine 170 0.0035 0.0880 3.50 1.88 77.70 Sand 200 0.0029 0.0740 3.75 1.70 79.40 230 0.0025 0.0625 4.00 1.41 80.81 270 0.0021 0.0530 4.25 1.19 82.00 325 0.0017 0.0440 4.50 0.55 82.55 Silt 400 0.0015 0.0370 4.75 1.06 83.61 450 0.0012 0.0310 5.00 1.04 84.65 500 0.0010 0.0250 5.25 1.53 86.18 635 0.0008 0.0200 5.50 0.96 87.14 0.0006 0.0156 6.00 1.74 88.88 0.0003 0.0078 7.00 3.40 92.28 0.0002 0.0039 8.00 2.44 94.72 0.0001 0.0020 9.00 1.94 96.66 0.0000 0.0010 10.00 1.59 98.25 Clay 0.0000 0.0005 11.00 0.99 99.24 0.0000 0.0002 12.00 0.54 99.78 0.0000 0.0001 13.00 0.19 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ,1,,1\ ,;lli,I;";",' ':'I,$b'iitl"Q¡!StatI8tl~I,'F~I (ll"'.;'" "I,,' 1..I,::I.,:"",'i',o",,\'I"I, I:,~',,"': Irl","'~' I"I,,:,':',:Y"'I,I,:":I,'I, ',:1"":,1,;:11 :.,::, I J,I,:'ï~":"'·":i'\ I ','p'~äffi.tðë",il.,',:I;lfr~.~,II; "I:',ill'li,'.n~~i:il,'. ':,:: 'FQlk;'",,' Median ' Medium sand sized (In) 0.010-1 00104 00104 (mm) 0.2650 0.2650 0.2650 ,Mi.o!':,;, '·"li,1 'I!I> ,I,:.::, 1;!;:·,'I:.F;I,,_:,sånd:ijlzei::ll; '.i' :i' (In) 0.00933 0.00483 0.00624 (mm) 0.2370 0.1226 0.1585 rSotth,g" :: Skewness '. Kurtoals "Floot' '.. 1.715 0.310 1.919 I i.· Strongly fine skewed 0.778 1.594 0.709 , Very leptokurtic 0.277 1.101 1.868 Component Percentages Gravel I Sand I Silt I Clay I Silt + Clay 0.00 80.81 13.91 5.28 19.19 Percentile !.Weight. %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.01887 0.47938 0.01704 0.43282 0.01556 0.39512 0.01392 0.35363 0.01176 0.29867 0.01043 0.26502 0.00474 0.12028 0.00150 0.03806 0.00047 0.01188 0.00014 0.00351 1.06 1.21 1.34 1.50 1.74 1.92 3.06 4.72 6.40 8.15 ) .. CDn!Lab BP Alaska MPS 261 Milne Point ) C.L. File # : 57111-103054 Sample ID: 5227.1 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 '#. :ë 21.0 '*' œ 60 ~ >; () c g! G) :;:, :¡:; 0" co 40 140 e "3 E . u. :;:, 0 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) "!'I"';'i,';\,':','.¡"¡""'~~:'""i. I~',',i,i""i!.,:!',~" ',.,' , i¡tI,',C,""lê,J, $', " %,8,','" ¡,!,,:ø, ,I~,',",' t~lb, tI, i"t, 1"I,O,h, " · ,I ',',' ,,'i ,'1'1 I",',', ¡,~.'<;i'}\,·,C¡I.,¡¡,.",¡",', ":~'.,'i,I;lli¡,',il"','"i """i' 'I! '1,1",,', 'I', ",' D~am,'~'r'I' " :"','I(,,i,III,' 'I",!" "i,'11 I',' ',,' ~~lghJ"~'i!1 ,'I ,'" :'!';~Us, Mesht,', "I' ,I,tln.1, I ,",',rm'm~::'1 "",', [IIIi'l, I '"rj"çl¡1"I,,!rCU'n1~1 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ '2Ö........ "ö:ö3'3T ...... Ö:ä4ÖÖ......... Ö :25.... -.... ·ö:ö·ö·.....·.... Ö: öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.65 0.65 35 0.0197 0.5000 1.00 4.22 4.87 . .......... ... ··········4·Ö··..·......Ö:Ö1·SS···..·Ö:42ÖÖ····..···1·:25·...-·..··ffs2:....·····14:39...· Medium 45 0.0138 0.3500 1.50 14.35 28.74 Sand 50 0.0118 0.3000 1.75 16.19 44.93 60 0.0098 0.2500 2.00 13.55 58.48 ...................... ...7"Ö·..... .....Ö:öös3'.....· Ö:21 ÖÖ.........2:25·... -. ...¡.1i:2.........· 63 :¡Ö...· Fine 80 0.0070 0.1770 2.50 6.21 69.61 Sand 100 0.0059 0.1490 2.75 3.17 72.78 120 0.0049 0.1250 3.00 2.05 74.83 ....................... ·14·Ö········ ·Ö:ÖÖ41"····.. Ö:·1ÖSÖ·........ 3:25..·· -.... T,Yi:2·····.... ·76:75..·· v. Fine 170 0.0035 0,0880 3.50 2.00 78.75 Sand 200 0.0029 0.0740 3.75 1.77 80.52 230 0.0025 0.0625 4.00 1.48 82.00 270 0.0021 0.0530 4.25 1.31 83.31 325 0.0017 0.0440 4.50 0.62 83.93 Silt 400 0.0015 0.0370 4.75 1.19 85.12 450 0.0012 0.0310 5.00 1.12 86.24 500 0.0010 0.0250 5.25 1.61 87.85 635 0.0008 0.0200 5.50 1.02 88.87 0.0006 0.0156 6.00 1.85 90.72 0.0003 0.0078 7.00 3.34 94.06 0.0002 0.0039 8.00 2.08 96.14 0.0001 0.0020 9.00 1.43 97.57 0.0000 0.0010 10.00 1.07 98.64 Clay 0.0000 0.0005 11.00 0.72 99.36 0.0000 0.0002 12.00 0.44 99.80 0.0000 0.0001 13.00 0.18 99.98 0.0000 0.0001 14.00 0.02 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ,'(':1;" )i', "~I ",'I~ortJnÐISt'tlstICs,~~olk)', ",' , ,,", , , " , "', ," I ", ,,::, 'i,',' " "I'" ",! """ " ,i,' ,: ,i'., ,,'," ,", I"" ",' ',' i " 'I 'I';il'" i"li' ",1""""""""<""',"'1;:""';'" :,','~""",";i""',,'i;:I ""',""I,,,.',,.,",', Ii 'I' "¡,,,IIIllCl, '11"'III:i,,': ,', ,"Patåmeter,I,;," "" ",rask,' ',,', , 'nl11an,", ,1""q,FQlk,,',, Mëa'liñ'iili.i1i il!lili,!I;,I;!i!:':'¡'II',I'i!:II!!!'I!¡ill'I:!'i!"I::ili"¡~ì~I~l:Hiäria!i, d~l!Ia".,!:'I'¡'!,:'I"!I;, (In) 0.0112 0.0112 0.0112 (mm) 0.2837 0.2837 0.2837 Meaoi! '1.:',lil,,'i,i 'il'., , ,"""',' ',¡:;ll'Ie'så¡)d.lzed"i(".ii' (In) 0.01004 0.00565 0.00709 (mm) 0.2549 0.1434 0.1800 Sorting, S~8wness, Kurtosis ,I poór 0.337 1.701 1.777 StrOl:\gly fine sk.wed 0.785 1.533 0.680 Very leptokurtlc 0.275 1.090 1.752 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 82.00 14.14 3.86 18.00 Percentile [Weight. %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phi] 0.02046 0.51974 0.01842 0.46795 0.01674 0.42530 0.01492 0.37892 0.01258 0.31945 0.01117 0.28366 0.00515 0.13093 0.00190 0.04835 0.00068 0.01732 0.00022 0.00553 0.94 1.10 1.23 1.40 1.65 1.82 2.93 4.37 5.85 7.50 ) .. Cø1!1.øÞ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5246.2 Sieve and Laser Particle Size Analvsis 100 40.0 80 32.0 "#. :ë 24.0 '#. C) 60 ~ ~ c CI) CI) .~ ::s 1ã C' :; 40 16.0 £ E ::I 0 20 8.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0,0042 Particle Diameter (mm) "~I!', ,':1,," ".: ','; 1 ',:' ;'11 ,i:'Þan ble,S!z."Dlst~ þutlOr'l!\ ,,', .~:I",I ¡'Iti/li~ ",,::,111";,,: ",','1" ''',','',',' """', ","', ',','," .,',',','Dla.n,"'e~~", r:,' , I",""',I'I,'.":,"},','""',', ",,','.,",' ",':,.",,', "';'1, · ,"11,,',' W, ...,1:, ..., ..., "~o"".,,.' ,I':,,' ",,'11'1, "," 1,,',1 "1.1'", ,I ~ ,I, , .,11, ,!.,~"II~, 1"',1 11:11" I", ,,','" I I,' I'.' '1";1.' 111:"'1 ",'.:, ,,"," ' I,~I~~I" I 70";!1111 'I 'i ' :: ¡'"',, rus: Meshl' :1: ',), nn~l' ,,'. ,I,.' ',I 'rMHlt:1 "', 1 I ':I'fll~,'~'" '1,.'11 rI,.'':1;1 , '"" cumll;'" 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ...................... .."2·Ö·..···.... ·Ö:Ö331····.. ·ö:ä¡öö····....·ö :25.... - ·...·Ö·.Ö·Ö·....····.. ö :öö····· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 1.08 1.08 ......... ················4Ö···..·····Ö:Ö1"6Š·..···Ö:¡2ÖÖ·······..1·:25····_···..6:54···..·..··7:62··..· Medium 45 0.0138 0.3500 1.50 15.92 23.54 Sand 50 0.0118 0.3000 1.75 20.71 44.25 60 0.0098 0.2500 2.00 15.63 59.88 ........................ ·]'Ö..······· ·Ö:ÖÖä3····· 'Ö:2'1 ÖÖ··...... ·2:25.... -.... 4.ä·ö···..·.... s:ܧз··· Fine 80 0.0070 0.1770 2.50 5.86 70.54 Sand 100 0.0059 0.1490 2.75 3.72 74.26 120 0.0049 0.1250 3.00 2.74 77.00 .... ····················14Ö··..·····Ö:ÖÖ41··..·..Ö:·1ÖŠÖ·..······:f2Š····_·····2·:ÖS··..··..·79:Ö6·..· V. Fine 170 0.0035 0.0880 3.50 1.62 80.68 Sand 200 0.0029 0.0740 3.75 1.50 82.18 230 0.0025 0.0625 4.00 1.21 83.39 270 0.0021 0.0530 4.25 1.09 84.48 325 0.0017 0.0440 4.50 0.43 84.91 Silt 400 0.0015 0.0370 4.75 0.92 85.83 450 0.0012 0.0310 5.00 0.98 86.81 500 0.0010 0.0250 5.25 1.18 87.99 635 0.0008 0.0200 5.50 0.96 88.95 0.0006 0.0156 6.00 1.42 90.37 0.0003 0.0078 7.00 3.16 93.53 0.0002 0.0039 8.00 2.31 95.84 0.0001 0.0020 9.00 1.54 97.38 0.0000 0.0010 10.00 1.34 98.72 Clay 0.0000 0.0005 11.00 0.86 99.58 0.0000 0.0002 12.00 0.40 99.98 0.0000 0.0001 13.00 0.02 100.00 0.0000 0.0001 14.00 0.00 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ::...'::,1,1'.,1,.,',:",',;.;,:,:,II,·,..:,"".",:, :"1,1:,.',:',;1:1,:1':;',',1,., ø,',. "',~, " In,',~,'," :;,', t" å", tl,'S, '1,,1",',',,:(, 'ft. Q,'I, k, )",;:.',"',1,',\.;;,",".;.',",',",',',1,1";:.1,',;1',',:.' I~, 'I'~' 11,1.' I, ,II ~ ii'III' I~I:~ I' ""'::11;11'1'1:,"', "I"" "",':111'" '..""~::"II'i" ,' ',i;,I, I; II ~':II\"''''''' ~ I, I"d,' '."'1 "",01.";'" ¡' I "'I" ,'P~t'ffl'~i~'.!!'.\ ,.I,Ttè$It,II:".'::'lri~a'n, 'il!;' 'I I'i" 'Fðlk.J I·· MØdllnl'¡!.".I'I'!I,illl!'il::!':illi;i,!I'!I':;i·,!'1"II:IIII!,!il'·:¡I'.!ilii!"'II,'!!~I!:·i'lI/ ldt~m!¡II '¡iit:'¡¡Jztlld!'I'!III::iii"I,"II'ili:I'¡'ll (In) 0.0112 0.0112 0.0112 (mm) 0.2848 0.2848 0.2848 ~Mean I Fine sand sized (In) 0.01004 00059..\ 000734 (mm) 0.2551 0.1509 0.1865 Sorting." ·"",';'·1. .1,POOr' 0.386 1.531 1.679 Skewness I ' StronglY fine skeWed 0.820 1.884 0.728 KurtoSis Very ,Ieptokurtlc 0.253 1.388 2.184 comrnent Percentages Gravel I Sand' ',Slit I Clay I Slit + Clay 0.00 83.39 12.45 4.16 16.61 Percentile Particle Diameter [Weight. %] [In.] [mm] [ph I] 5 0.01810 0.45982 1.12 10 0.01658 0.42122 1.25 16 0.01538 0.39069 1.36 25 0.01408 0.35767 1.48 40 0.01235 0.31367 1.67 50 0.01121 0.28478 1.81 75 0.00600 0.15253 2.71 84 0.00230 0.05831 4.10 90 0.00065 0.01652 5.92 95 0.00019 0.00490 7.67 ) . CÞre t.øb BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5260.1 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 ~ 0 :ë 18.0 ';/!. æ 60 ~ >; CJ C ~ G) :s ;; I:T ca 40 120 e '5 E . LL :s () 20 6.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ":¡:,,:'I, :",!"'!¡",'i",i,:i:,',~".~::',: ':!i'I;',I','ii" :'b,":i~~::~~'ii~~~~','i~ll~t~t~u, ~Ó~'I""!,:,I,::,!¡":,,ii,:,,":!II:,:,,,~~,'~~,!:'~~i,!~','i!"'::illi,i,I',,!,: ',I':';' ,,', "~I, rUSIMeshf, ,:I,n"~1'I' 'i,':!¡,',IFtn'AAf:,I':'!"'¡'i li"':{,~'l'¡II"i'II:I'.:tÎ"'~I': t:,I"i,lil r~ti~ll:i: 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ···················..··..2·Ö····..· ····Ö:Ö331· .·..·..Ö:ä4ÖÖ·········Ö:25··..-·····Ö·:Ö·Ö..···..····Ö:ÖÖ..·· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.65 0.65 ....................... ·4·Ö····..····Ö:Ö1·6S···· ··Ö:42ÖÖ..·······1·:25····_····4·:14·······....4:79····· Medium 45 0.0138 0.3500 1.50 9.46 14.25 Sand 50 0.0118 0.3000 1.75 13.75 28.00 60 0.0098 0.2500 2.00 14.88 42.88 .... ···············..····fö·..·······ö:ööä3····..Ö·.2·1ÖÖ··...·..·2:25····_··..·6:61..······..49:4g···· Fine 80 0.0070 0.1770 2.50 9.98 59.47 Sand 100 0.0059 0.1490 2.75 5.70 65.17 120 0.0049 0.1250 3.00 2.89 68.06 ...................... ..14·Ö....... "'ö:öö4 r...·.. Ö :'1 ÖŠÖ........· 3: 25...· -.....1"."8·3""........ 69:äg.... V. Fine 170 0.0035 0.0880 3.50 1.75 71.64 Sand 200 0.0029 0.0740 3.75 1.77 73.41 230 0.0025 0.0625 4.00 1.60 75.01 270 0.0021 0.0530 4.25 1.41 76.42 325 0.0017 0.0440 4.50 0.65 77.07 Silt 400 0.0015 0.0370 4.75 1.29 78.36 450 0.0012 0.0310 5.00 1.30 79.66 500 0.0010 0.0250 5.25 2.02 81.68 635 0.0008 0.0200 5.50 1.29 82.97 0.0006 0.0156 6.00 2.45 85.42 0.0003 0.0078 7.00 5.07 90.49 0.0002 0.0039 8.00 3.38 93.87 0.0001 0.0020 9.00 2.36 96.23 0.0000 0.0010 10.00 1.70 97.93 Clay 0.0000 0.0005 11.00 1.10 99.03 0.0000 0.0002 12.00 0.66 99.69 0.0000 0.0001 13.00 0.27 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ,I " I I I' ""l SQrtin~I'$ta.i~t cs,~FOlk}I' ~I'I I 'I !! I II I I I I II I I I I I " "...11' ,!" ,1"'1 'I! ' WI" " "', ", I "'1'" " ~aramete¡:' 1;rask Inman I , r:olk 'NltilÐlli!î",'IIII:"!:"I! 'I:":!: 1'.""'!'!llil!':"¡.!"ii:'I':I',!::II·':'!:"!II:""!:!II'!'!':II,'i"::1!IF :lile"'s'tia'!~lzid',':"I,':!,,!'::',':'" ""'1:1:" (In) 0.0090 0.0090 0.0090 (rom) 0.2278 0.2278 0.2278 Meal') "I 'ii,',:' ,III,i:,,,: .'" ':I"'i,i,I,,,,\{.I'Y!fIQ',s.n&i!$lze~,,'!,.! ,I'i.',·.,:1 ' ", (In) 0.00744 0.00318 0.00449 (mm) 0.1890 0.0808 0.1142 So~lng " 'I '~.Poor'::'; , 2.209 0.229 2.157 Skewness "I' Strongly fine skewed 0.623 1.259 0.723 Kurtosis Lepokurtlc 0.327 0.694 1.293 comrnent Percentages Gravel I Sand Slit I Clay I Slit + Clay 0.00 75.01 18.86 6.13 24.99 Percentile Particle Diameter [Weight. %] [In.] [mm] [phi] 5 0.01703 0.43247 1.21 10 0.01533 0.38941 1.36 16 0.01392 0.35359 1.50 25 0.01235 0.31370 1.67 40 0.01028 0.26101 1.94 50 0.00897 0.22784 2.13 75 0.00253 0.06428 3.96 84 0.00073 0.01847 5.76 90 0.00031 0.00782 7.00 95 0.00011 0.00292 8.42 ) . CÞre1BtÏ BP Alaska M PS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5266.0 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 ~ 0 :ë 18.0 '#. 0) 60 ~ ~ (,) s:: ~ Q) ::I :¡:¡ CT co 40 12.0 £ "3 E ::I (,) 20 6.0 o 4.0000 1.0000 0.2500 , :li,~I' " ,', ,',~art~clø' ~1~~,ÞlstrlbQtJo~,""':'II'I"":II,,il::II'i,':II'I''::', :" ,,", '. ",:1,,1\ , '" ".',' b)atnet~r I ",I,~~"II,II,I,I""': 111,1' " '",11 >"'I~I'I I, }i .1~~)p,ltt~I/"i111'" I' ' I, I: ,ruSIMe$111 I "II' ,r n~] ".,':",', "hnml,I, II,', ',l;.'I~I,"I',I,llln'è !11:'IIII' !1'FCUn1' "" 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ................... ······Ž·Ò···········Ö:Ö331·······Ö:ä4öÖ····....·Ö:2Š·..._....·Ò·:Ò·Ò·....······Ö:ÖÖ..··· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.45 0.45 ........... ·············¡Ò···········Ö:Ö1·SS··..··Ö:¡2ÖÖ·········1·:2Š·..·_·..··3'."ê·3····..···..¡:öä···.. Medium 45 0.0138 0.3500 1.50 8.94 13.02 Sand 50 0.0118 0.3000 1.75 13.40 26.42 60 0.0098 0.2500 2.00 14.68 41.10 ........... ... ···········7Ò····..·····Ö:ÖÖŠ3······Ö:21ÖÖ·····....2:2Š····-..··'if57·· ·..····¡7:67..·· Fine 80 0.0070 0.1770 2.50 10.07 57.74 Sand 100 0.0059 0.1490 2.75 5.99 63.73 120 0.0049 0.1250 3.00 3.35 67.08 ........................ 1'4·Ò......... ·ö:öö¡ r..... ö:·1ösö..·...·..?f 25.... -" .."2·:34.......·.. 69:42.... v. Fine 170 0.0035 0.0880 3.50 2.23 71.65 Sand 200 0.0029 0.0740 3.75 2.14 73.79 230 0.0025 0.0625 4.00 1.90 75.69 270 0.0021 0.0530 4.25 1.67 77.36 325 0.0017 0.0440 4.50 0.76 78.12 Silt 400 0.0015 0.0370 4.75 1.48 79.60 450 0.0012 0.0310 5.00 1.46 81.06 500 0.0010 0.0250 5.25 2.17 83.23 635 0.0008 0.0200 5.50 1.34 84.57 0.0006 0.0156 6.00 2.43 87.00 0.0003 0.0078 7.00 4.67 91.67 0.0002 0.0039 8.00 2.94 94.61 0.0001 0.0020 9.00 2.02 96.63 0.0000 0.0010 10.00 1.49 98.12 Clay 0.0000 0.0005 11.00 0.99 99.11 0.0000 0.0002 12.00 0.61 99.72 0.0000 0.0001 13.00 0.25 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ,i,ll: Ii I II: 'lilSårth'Q IStatls'tlcj, {FOlk),:'''' 'I,' 'I': I':"' '" I' I", ',I·"'", ' : I I,', ',' 'I ''''''1111111'' 'I.' I"" .;", ',I:",;, I· ',', I ,:' I , ' " ", 'I <', I :1,: I';'" I ,'I ,:, II 'i 11,1' \' ,:"""",.:1 'I ' I 1'.' "",i II"'} :,,1'11" "'1,' "I' '1,' I,¡ , :' ,,': JI'j,:I,'" ,II , "~¡':, 1 " I:, II', :11.",:, 1'1,"'" lilll·~I, I 1'1' I',::, 11,1 ," .'·I:I~a~ameterllll'! :,1 '1iråSK.;I'. .': nmaol" II ,.."lit",',:, Meetl_li!:': III:" '1'1:":,:,,1,,: "I'II"<"!'!,:;I'I!' d'IIIIFlhelhlnd';:klzid,II' , (In) 0.0087 0.0087 0.0087 (mm) 0.2214 0.2214 0.2214 Meäri ,'.' . I' ,IVery *ine åand sl:zed (In) 000741 0.Oü35.1 000.1 78 (mm) 0.1882 0.0900 0.1215 Sortllilg .":".,; $kewnéss KurtoSis "1 .: Vd~OOr:,I" 2.114 0.259 2.027 Strongly fine skewed 0.657 1.300 0.698 Lepokurtlc 0.320 0.784 1.318 comr' nent Percentages Gravel I Sand Slit I, Clay I Slit + Clay 0.00 75.69 18.92 5.39 24.31 Percentile [Weight. %] Particle Diameter [In.] [mm] [phi] 5 10 16 25 40 50 75 84 90 95 0.01674 0.01505 0.01367 0.01211 0.01005 0.00871 0.00271 0.00092 0.00038 0.00014 1.23 1.39 1.53 1.70 1.97 2.18 3.86 5.42 6.70 8.18 0.42526 0.38237 0.34716 0.30756 0.25520 0.22135 0.06879 0.02333 0.00960 0.00344 ) .. røe l8IÌ BP Alaska MPS 261 Milne Point C.L. File #: 57111-103054 Sample ID : 5276.1 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 "¡fl. :: 18.0 "¡fl. t» 60 ~ ~ (J c .~ Q) ::J '; 0- :i 40 12.0 £ E ::J (.) 20 6.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 ., '", ,~,:. "';'I.Pånl¢le'ISIz.ø!:~hstdbUti~""" ":;~!'" t':'¡~'<'¡ ,,':¡;~~"":"I:' " ':, ¡II' ,; Ii:. . \: '.." ,i i"! ,IDlluIiØ~er: ' , , "";i,;':,.,;. ;'.:,:ii","~, ¡ ,.:".\!V~lghÍi'O¡f'. ',', ,':' ·",'ruSMesh1··· ,·.',:.";,nn/I, I'" :.,r¡nml";','I,'r,dI~':":I":'I"'n~'çl;l'::",,"rcOm.~ 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2·Ö····....· ·Ö:Ö331"....·· Ö: ä4öö·..···..·ö: 25····-··.. ·Ö:öõ··..·...... ö: öö··..· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 1.52 1.52 ....................... ..4'Ö.......... Ö:Ö 1"65" ....Ö·.4'2ÖÖ·... .....1· :25·... -.... ·5:Ö4"......· "6: 56..... Medium 45 0.0138 0.3500 1.50 9.41 15.97 Sand 50 0.0118 0.3000 1.75 12.80 28.77 60 0.0098 0.2500 2.00 13.44 42.21 ........................ ·:;õ..···....· ·Ö:ÖÖå3..···· ö: '2'1 öö····.... ·2:25·..· -.... ·g.'iiš·····..· ":¡ä :19···· Fine 80 0.0070 0.1770 2.50 9.33 57.52 Sand 100 0.0059 0.1490 2.75 5.77 63.29 120 0.0049 0.1250 3.00 3.28 66.57 ··········..···..·······14Õ········ ··Ö:Öö4'1··..···Ö:·1ÖSÖ..·..··..3:25··..-···..:2":1·4'·········6ä:71···· v. Fine 170 0.0035 0.0880 3.50 1.88 70.59 Sand 200 0.0029 0.0740 3.75 1.80 72.39 230 0.0025 0.0625 4.00 1.68 74.07 270 0.0021 0.0530 4.25 1.56 75.63 325 0.0017 0.0440 4.50 0.73 76.36 Silt 400 0.0015 0.0370 4.75 1.46 77.82 450 0.0012 0.0310 5.00 1.47 79.29 500 0.0010 0.0250 5.25 2.22 81.51 635 0.0008 0.0200 5.50 1.40 82.91 0.0006 0.0156 6.00 2.81 85.72 0.0003 0.0078 7.00 5.56 91.28 0.0002 0.0039 8.00 3.27 94.55 0.0001 0.0020 9.00 2.11 96.66 0.0000 0.0010 10.00 1.46 98.12 Clay 0.0000 0.0005 11.00 0.98 99.10 0.0000 0.0002 12.00 0.61 99.71 0.0000 0.0001 13.00 0.25 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ''', :".., i,., .:,·,',i',:',',')~,·,¡,.i,',,:,,;:¡':, ., :',,~S, , ',ø,'., '1',,',.,I;,p~,~S, '" t.""tl, S.", '.tl, '~.",':,~"'~,",O,;',.I, k,,),','::,:,i','¡,:,',', .',':':,',I!.';,", '"....".,','. '",::"", I ' , I, I I ' ," I I ,,' " 'I " , 'II ' ' , ,', ", : I, I I, ~ II '.' I ", I' "I I I' I I ' ; 'I , I' , I I I' ,," I ' I I' II' ,. I I " , I I" , ." I ' I I ',, I II,I/,,~::I'I'I"I' 1",1 ''II, 'lid' .,' I' 'I;" I ":'1 'I: "'''~,~ I'",': ',;1"1' 111,:'1'11',' '," ,I ,', I' 1'1,,1, " I,; ,,1,':.'11 'I~ 'II', "I :II":Pa'ramèter:' ,'!' ,:' 'ITrás (', ~:I·,' 'Intna'n",I.,', " ,Folk,!'·.,. 'Mødlal,:I,I";:I,ill!I,'::":'!':I,,'I",I:':II''''''.''.'1""i",:I'I:!I":I",li"'I'i'/",'¡J'ênijl.slz~Ö' :,1"'"'.:;": ,:1""1' (In) 0.0088 0.0088 0.0088 (mm) 0.2226 0.2226 0.2226 Meal'! I, Very,tlne sand'size,d'!'I,' (In) 0.00740 0.00324 0.00451 (mm) 0.1879 0.0822 0.1146 SortI1;l9i;' '.". ,"1:' SkewnEls8 KurtòSls 2.348 V;Póor I 0.227 2.139 StronglY fine skewed 0.608 1.167 0.690 Lepokurtlc 0.330 0.650 1.174 comrnent Percentages Gravel I Sand Slit I Clay .I Slit + Clay 0.00 74.07 20.48 5.45 25.93 Percentile [Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] (phI] 0.01793 0.45538 0.01588 0.40330 0.01425 0.36194 0.01252 0.31802 0.01022 0.25960 0.00877 0.22263 0.00227 0.05768 0.00073 0.01866 0.00034 0.00875 0.00013 0.00342 1.13 1.31 1.47 1.65 1.95 2.17 4.12 5.74 6.84 8.19 ') .. CøreLab BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5297.2 Sieve and Laser Particle Size Analvsis 100 35.0 80 28.0 ~ 0 ~ 21.0 '#- 0) 60 ~ ~ c ~ CI) ::s ¡ C" "5 40 140 e E . LL. ::s (,) 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) "I 1,','i.'III¡,:, 11(,'i,',:!":', ¡III,':"',., i, :,:'¡,:ill"'I, p1~,ttl,êlit, .,181"2:,, ~"\,'IÐ"., 1,$,','~,',.II),qt.I,\ø,n,"":',",I",'I,11'llil, ',",11,1"" ¡i,I'~'I;'::';'I',¡i'~',il,'I¡'i;,i¡¡'I':¡1l!i",',I',', !ili,.' :",:"",,',:"""".",,,' , ,I,·,'.,' "" ' ',',,',., 'b1arn$ter'" .,.'" "",::11' "'I' ", ,I, "'..., ""," ','" 4\1 'Qh~I~'~1 ':rU$IMø~hl"','.:: ,.1' ,."·,,:""rJn:ll,,,III,:.I,':,,',rhi:rrll ,,!,,:.I:'I'::'I;r:b'11:li,.:;': 'I',,':,IM~ ;l"I"I'IIIIi,':~6ij~ll~.,i:' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2·Ö...·... "'Ö:Ö3"3"1"'" "'ö: ä4öö·........ ö :2if'" -... ..0·:0·0...·......· Ö: ÖÖ..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.16 0.16 35 0.0197 0.5000 1.00 1.97 2.13 ·..···············....·..¡Ö······..··Ö:ö1"sS..····Ö·.42ÖÖ·········1':21r..·-···..S::;:;-····· ···..i:9Ö····· Medium 45 0.0138 0.3500 1.50 10.52 18.42 Sand 50 0.0118 0.3000 1.75 13.97 32.39 60 0.0098 0.2500 2.00 13.84 46.23 ...................... ...7"Ö......... ·ö:ööä3"..... Ö:21ÖÖ......... 2:25·... - .....5·:7å.......... 52:Ö 1'.... Fine 80 0.0070 0.1770 2.50 8.32 60.33 Sand 100 0.0059 0.1490 2.75 4.84 65.17 120 0.0049 0.1250 3.00 3.09 68.26 . ................. .... ··14·0·······..·Ö:ÖÖ¡1..·····Ö:·1ÖSÖ·........3:25..··_·····2·:så·······..·:¡Ö:ä4·..· V. Fine 170 0.0035 0.0880 3.50 2.48 73.32 Sand 200 0.0029 0.0740 3.75 2.26 75.58 230 0.0025 0.0625 4.00 2.04 77.62 270 0.0021 0.0530 4.25 1.87 79.49 325 0.0017 0.0440 4.50 0.87 80.36 Silt 400 0.0015 0.0370 4.75 1.63 81.99 450 0.0012 0.0310 5.00 1.53 83.52 500 0.0010 0.0250 5.25 2.17 85.69 635 0.0008 0.0200 5.50 1.27 86.96 0.0006 0.0156 6.00 2.15 89.11 0.0003 0.0078 7.00 4.02 93.13 0.0002 0.0039 8.00 2.41 95.54 0.0001 0.0020 9.00 1.61 97.15 0.0000 0.0010 10.00 1.23 98.38 Clay 0.0000 0.0005 11.00 0.85 99.23 0.0000 0.0002 12.00 0.53 99.76 0.0000 0.0001 13.00 0.21 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 " '1",1 "':";'1'1,," '" """"",;, "~;¡'¡'d' 1"'''''''St.~I'' 'tl"'¡'¡II'~I!!'" 'I~)"'" "I" .'''', """" ¡"',,' "i,::,"I¡,,:i'II',I:,:,'I,,:~II,',',:.II,~1'1:~,:I::~'i¡I","I',llli"!'~W, " ,'I~I',' H;:: ',"',~,' ,& i,-, 'i:',',f\,',iQ ,'~ :,I:I",,,:,,!I',I, ,!II;II::I,\,",',');IIII:;:,'I~,~,;',',"j 1 ' . I ' 1 I'",,, I~' , I ~ . I ' ", "I 101 ',' ,,' I I,I.. , . "I ,I , '.' I' 'I " : ' , 'I, I' , " ,,' "I" 'I, ': ' II :,: ",,,: I I,: ' " ~ ,;1,.1", ',','i' ""lk~:I'r,:lr ",~"" ,1:"""1 ~"":'"I"""I" 1 1<I'I'i' I" "",i' ""':i" ,', "', , " ,'I', ~""L,""':I,"" , ',I": 'IPari:lllHete~II",", ,,"\I,wrasK'<II"! nnul. \ .,'l' , " . ,, ":()Ik' ,I" ',MfII'li~'III:I!I':,II'i·II':II"I!:!:!:'!'::';i~~II!!:'il..I:II!li,':!I~rll:'IIII,I:I::I!:':'.':'II,!r!!ln¡I'iibij:.sli¡:il!i,!:.'.·,! !,:."1·'II:I'!;.:li:'I...,' (In) 0.0093 0.0093 0.0093 (mm) 0.2373 0.2373 0.2373 l\fte~i'ì'i,r,I'.: ,I ::!:¡I.:.:'I"i,'FII'1.sånij,~lz'd, (In) 0.00811 0.00432 0.00559 (mm) 0.2061 0.1098 0.1419 Sc)Ì:'tli1g. 'I" '., 'I" Skewness KuH:osls 2.024 Paoli" 0.292 1.905 I,; ."Strønglyflne skewed 0.690 1.334 0.666 Lepokul1lc 0.310 0.887 1.351 Component Percentages Gravel 1 Sand I Slit ,I, Clay I Slit + Clay 0.00 77.62 17.92 4.46 22.38 Percentile [Weight, %] Particle Diameter [In.] [mm] [phi] 5 10 16 25 40 50 75 84 90 95 0.01846 0.46892 0.01643 0.41741 0.01482 0.37637 0.01304 0.33133 0.01079 0.27403 0.00934 0.23728 0.00318 0.08089 0.00126 0.03203 0.00051 0.01286 0.00018 0.00449 1.09 1.26 1.41 1.59 1.87 2.08 3.63 4.96 6.28 7.80 )  :E~i~:t ) C.L. File #: 57111·103054 Sample ID : 5302.0 Sieve and Laser Particle Size Analvsis 100 15.0 80 12.0 *' 1: ~ m 60 9.0 0 ~ ~ (,) c: .~ Q) ::J -; D" :¡ 40 6.0 e E LL. ::J 0 20 3.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I',. ,'. :., I: ',.,. .', ~ 'I: ",.~ ~':.' ,I' ,~', "',: ," .", ~ '.,~; "" .",~: P~rtlc!p~,$lfe,I)I.tt:lbÍ ~öni'.: ~".' \''" :i~,','i. I~ ,'~I ,I.:.' '" i¡i',I"',11 \ ,,; I, ;I:';II,';!",¡,:, ., '1",' , ,', I '1'" ..' Ii ,,' .' ,ºI'a"':~terl:,',: II:,I,{ ,1~1¡':"'i:i II""!';',""I i"""'.' 1,'~lg~t¡~/Q'I'i"I"" ',';", ,,"i'rUS Msshl,'¡' ,I ,1:'F I1~ll' ,;"'II" ,~"rlnm~:'II"'I':I't,"¡bI~"":, ;Ii' II ,'1111:: ¡~I,'II':"I:rctim';1.' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....................... ··2·Ö···..· ····Ö:Ö331····..·ö:ä4ÖÖ······..·Ö:25·..···....Ö·:öö····..····Ö:ÖÖ····· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ '4Ö·.......... Ö: ö 1·65..... ·Ö·.42ÖÖ·..... "'1': 25...· -. ...·ö:öò........·.. ö: ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.15 0.15 Sand 50 0.0118 0.3000 1.75 0.88 1.03 60 0.0098 0.2500 2.00 2.15 3.18 ........................ ·:;Ö··....·.. ·Ö:ÖÖä3....·· Ö:2'1 öö....···.. 2 :25··.. -.... ·1·.sä·..······.. 4: 76··..· Fine 80 0.0070 0.1770 2.50 4.05 8.81 Sand 100 0.0059 0.1490 2.75 4.77 13.58 120 0.0049 0.1250 3.00 4.83 18.41 ....... ...... ···········1'4Ö···..·····Ö:ÖÖ41····..·Ö:·1ÕŠÖ·········:3:25····-····'4·:39····...·..22:äö·..· V. Fine 170 0.0035 0.0880 3.50 3.80 26.60 Sand 200 0.0029 0.0740 3.75 3.36 29.96 230 0.0025 0.0625 4.00 3.12 33.08 270 0.0021 0.0530 4.25 3.11 36.19 325 0.0017 0.0440 4.50 1.61 37.80 Silt 400 0.0015 0.0370 4.75 3.43 41.23 450 0.0012 0.0310 5.00 3.80 45.03 500 0.0010 0.0250 5.25 6.28 51.31 635 0.0008 0.0200 5.50 4.08 55.39 0.0006 0.0156 6.00 7.64 63.03 0.0003 0.0078 7.00 14.78 77.81 0.0002 0.0039 8.00 8.56 86.37 0.0001 0.0020 9.00 5.47 91.84 0.0000 0.0010 10.00 3.74 95.58 Clay 0.0000 0.0005 11.00 2.35 97.93 0.0000 0.0002 12.00 1.41 99.34 0.0000 0.0001 13.00 0.58 99.92 0.0000 0.0001 14.00 0.08 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 Il'll:il:i"i,i,'I:II:',,¡~::'iill)'I¡,.;,!i,:,II$d~ln~i$tå~ltlÇ$!i(f\'~lk~I:,~:ili;:ii'II,~,':iii¡":"li,:·i ":1" 1,'",1', ""'i~" , I' ~:'~I :"'I""I"~,I' I',' I,~i "::""I'(",,,,,,,"~'" ,;' ,1'1 ,',,' ,,"1,,'1:',:,1:," ,¡I, ",", ':1:' 1"11 !',', "",~I, i 'lim'~l..:"I,"'""," ,'1",."," \1;,( ';i,"". '1'1',111"" :trI,I"".,I,/'"II'::','I.,.,'i"I'·F"", Ili~!1 ,: I,' ,),,, "', l"'Iår nJeU;tr,,"" 11..1' ",: l,rg8 \I., "I '.' n anl,'/ " I '"', ,o~"," (In) 0.0011 0.0011 (mm) 0.0274 0.0274 0.0274 Mean"':,,"::i, I;il\;" ,i, ,,'i\Sllf,.lz'j:j.¡,I,' (In) 0.00214 0.00103 0.00104 (mm) 0.0543 0.0261 0.0265 'Sorting 'I, " 'I ,I'" 'v;PÓOr,i 3.434 0.179 2.403 Skewness", " '"I Finely skewed 1.065 0.314 0.115 Kurtosis Platykurtlc 0.254 0.544 0.883 Component Percéntages Gravel I Sand I Slit l Clay I Slit + Clay 0.00 33.08 53.29 13.63 66.92 Percentile [Weight. %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] [phi] 0.00894 0.22715 0.00720 0.18292 0.00574 0.14585 0.00394 0.10006 0.00171 0.04343 0.00108 0.02735 0.00033 0.00849 0.00018 0.00467 0.00010 0.00260 0.00004 0.00112 2.14 2.45 2.78 3.32 4.53 5.19 6.88 7.74 8.59 9.80 ') .. Ctnllll:Î BP Alaska M PS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5307.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ 0 ...; ..c 12.0 ?fl- m 60 ~ ~ c ~ CI) ~ ~ 0- "S 40 8.0 e E LL ~ 0 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I' .ii ii' :.i :'1: I:'~ ,~aH:lclè',SI:ai.'Oi$tl"ibütlØh" 1!:I:'I::'\",'III,:iï"i' I :',,': ,! ,I"',I I il".:,',,'. 't¿~I~~~h'l,.,:,·:"I'I~:~rr~f1t~~II:'·il,~~~il,,:'il,,:1,,::I:',"ltlll~'ll::',il":lt,riG~'~~~~~b~~j:" I 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ 2.·Ò·..··.... "Ö:Ö33 r·..... ö :ä4öö..··....·ö: 25..·····.. ö·:öò······....·ö: öö····· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ ¡·ò.......... ·Ö:Ö 1 Ë55'" ·..Ö:42ÖÖ....·... '1":25 ....- .....Ö:Ó·9..·...... ·ö: mf'" Medium 45 0.0138 0.3500 1.50 1.57 1.66 Sand 50 0.0118 0.3000 1.75 5.05 6.71 60 0.0098 0.2500 2.00 9.14 15.85 ........................ ·7·Ò......... ..Ö:ÖÖä3...·.. ö :2'1 ÖÖ........·2: 25·...-·..· 5·.62...·...... 21:47"'" Fine 80 0.0070 0.1770 2.50 11.47 32.94 Sand 100 0.0059 0.1490 2.75 9.44 42.38 120 0.0049 0.1250 3.00 6.30 48.68 ....................... ·1¡·Ó........ "ö:öö4r'" ...ö: '1ÖSÖ" .......?f25·..· -.. ...3"."79......... 52:4:;·... v. Fine 170 0.0035 0.0880 3.50 2.58 55.05 Sand 200 0.0029 0.0740 3.75 2.25 57.30 230 0.0025 0.0625 4.00 2.09 59.39 270 0.0021 0.0530 4.25 1.91 61.30 325 0.0017 0.0440 4.50 0.88 62.18 Silt 400 0.0015 0.0370 4.75 1.70 63.88 450 0.0012 0.0310 5.00 1.72 65.60 500 0.0010 0.0250 5.25 2.86 68.46 635 0.0008 0.0200 5.50 1.92 70.38 0.0006 0.0156 6.00 3.64 74.02 0.0003 0.0078 7.00 8.93 82.95 0.0002 0.0039 8.00 6.20 89.15 0.0001 0.0020 9.00 4.35 93.50 0.0000 0.0010 10.00 3.10 96.60 Clay 0.0000 0.0005 11.00 1.87 98.47 0.0000 0.0002 12.00 1.06 99.53 0.0000 0.0001 13.00 0.41 99.94 0.0000 0.0001 14.00 0.06 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 '.',"¡'II'::"',I~'i',,'I.,""i.,;,I,'~Qnl~g:~taqsti~:'~~olk~,'·II: :1",';:,' , I , 'I,' " II, I '," 1,1,,,, I" I,', "1'1" I,'" II" ',',,1'1' d,' ',.1 ",' ,".,1 II ,"'1 "II,,,,, ,I·'i', I Î ~: I ,:;,::::';;P.tèfu¡~~~! '!":'!:,:'i::. ,:'I"I',(Jr~~;~il' ~ ~::;'II'I::II;'I:ri:h1'ri:,' :,::; ',:~I!'!":';!I;:"¡~,~II~:~,', : : Nledlan,";': : 'i1:::'I'II:: I:i":'~;"'il'li;,::,I·. ~1'lil:"'I""Flnè',så.,'alsl:zed:·'.' "".'.", '" (In) 0.0050 0.0050 0.0050 (mm) 0.1258 0.1258 0.1258 ,"'..01,1":" ', J",' 'i' $ilhl;.I:t.,:;'I,,' (In) 0.00455 0.00160 0.00233 (mm) 0.1156 0.0406 0.0592 Sorting:," / SkijWne8. . Kurtosis 3.981 V.,póor 0.162 2.489 Strongly. fine skewed , 0.434 0.965 0.638 Platykurtlc 0.367 0.473 0.796 ,Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 59.39 29.76 10.85 40.61 Percentile [Weight. %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [in.] [mm] [phi] 0.01251 0.31784 0.01105 0.28078 0.00988 0.25098 0.00857 0.21757 0.00661 0.16788 0.00495 0.12583 0.00054 0.01373 0.00026 0.00655 0.00014 0.00344 0.00006 0.00148 1.65 1.83 1.99 2.20 2.57 2.99 6.19 7.25 8.18 9.40 ) .. D:Jre I.øb BP Alaska MPS 261 Milne Point ') C.L. File #: 57111-103054 Sample ID : 5341.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 :::..e 0 .... .c 15.0 '#. æ 60 ~ ~ CJ C ~ ( ) :J .. C' ca 40 10.0 £ "3 E :J 0 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ", """", ", "" "" ", I,',' '''' ",':I''''':':P,'', :,ad,.",I,C,',', lA,", ',S, '12, 8,ID, , , I'~, ',' ,Iþbti, Þ"n,',',;;¡,',,¡'¡II','1 i",",'I,', 1",,/:,,1 ",.,;!I',I,i"'::,I':'I:,,::':,i',;I,i:,,,,:,'::!:,:,':,'I,:,' ':::,,1',<':,:,:,;,,":': ,'" ,Q)a~e~~~ I:": i"): ,II,:,. '~~I:"'\!"'!:'I' "'i",:, Welph~% "1', " ,,' ;',,' 'rUSMe$h~ "," rh1~1 :i'l','. ",rmml"',:II'!1 ': IrICb'JII,llii"flri'cl;i I',', rbom:i!I,: 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2Ö··..··..· ·Ö:Ö331..·..·· ö:ä4öö·......·· Ö:25···· -.... ·ó·:ó·ó····..··..· ö: ÖÖ··..· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ········..··············¡Ö········· ·Ö:Ö1·6S······Ö:42ÖÖ·..····..r25····-··..·Ó·:Ó·Ó·····..····Ö:ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.74 0.74 Sand 50 0.0118 0.3000 1.75 4.83 5.57 60 0.0098 0.2500 2.00 10.73 16.30 ........................ ·fö·....··· ..Ö:ÖÖå3·..··· Ö:2'1 ÖÖ·..······ 2:25·..· -.... "ff8"7··..·..·.. 23: rr'" Fine 80 0.0070 0.1770 2.50 13.96 37.13 Sand 100 0.0059 0.1490 2.75 10.87 48.00 120 0.0049 0.1250 3.00 6.32 54.32 ...... ··········..······14·Ó··..···..·Ö:ÖÖ41·······Ö:·1ÖSÖ··..··..·3:25····_···..3".·1·2··..······57:44···· v. Fine 170 0.0035 0.0880 3.50 2.08 59.52 Sand 200 0.0029 0.0740 3.75 2.25 61.77 230 0.0025 0.0625 4.00 2.50 64.27 270 0.0021 0.0530 4.25 2.47 66.74 325 0.0017 0.0440 4.50 1.17 67.91 Silt 400 0.0015 0.0370 4.75 2.22 70.13 450 0.0012 0.0310 5.00 2.18 72.31 500 0.0010 0.0250 5.25 3.26 75.57 635 0.0008 0.0200 5.50 1.98 77.55 0.0006 0.0156 6.00 3.64 81.19 0.0003 0.0078 7.00 7.51 88.70 0.0002 0.0039 8.00 4.38 93.08 0.0001 0.0020 9.00 2.74 95.82 0.0000 0.0010 10.00 1.87 97.69 Clay 0.0000 0.0005 11.00 1.21 98.90 0.0000 0.0002 12.00 0.75 99.65 0.0000 0.0001 13.00 0.31 99.96 0.0000 0.0001 14.00 0.04 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 "':i",,ir:,III, "I,,',""S, ,Örtl~g, $tâ, tl, 5t,',I~, "I, Fi'Olkriil:"I:,", ,,:,1,1:, I' I """'IIIII'~: :"'1,11 I' ,11:"'11""','1' I,' ,,'I "II',","I, '. ",,1,' I., II', "'I~" 'I' ,I ',,',,' I 1,:1" , ,I '",1, I 1""";1:1.:;.",""'.,';"1,1,,,':,,',", "":..0"1,,, ,:' ;'jl:;' ,""', ,,( , '""I'II"IIli,::;",:I',':'1 '1'1 II,," ,"arame¡ef',', ':1, ,II,ra,",, ,I, ' ,: l'lnman ",':", 'r:olk' I, ," , l.eølli:f:'II:I"I,'."~I.'II",.,',II:'I','.'II;,'I":···,'.··IIFlne'181~ñè:li8Ized"'::I:;I': :::··'1' , (In) 0.0060 0.0060 0.0060 (mm) 0.1520 0.1520 0.1520 ,Nlean, I I'·: "'II: . il· ,Vël\rflQesãndsized ... ',i. (In) 0.00496 0.00213 0.00301 (mm) 0.1259 0.0541 0.0763 SortlI'lQ¡ . Skewhëss Kurtosis ·'1', 2.876 V.poor 0.214 2.160 Strongly fine skewed 0.514 1.099 0.689 Mesokurtlc 0.364 0.555 0.930 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 64.27 28.81 6.92 35.73 Percentile [Weight, %1 Particle Diameter [in.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.01209 0.30710 0.01091 0.27721 0.00995 0.25276 0.00884 0.22456 0.00722 0.18343 0.00599 0.15204 0.00107 0.02715 0.00046 0.01157 0.00024 0.00612 0.00010 0.00254 1.70 1.85 1.98 2.15 2.45 2.72 5.20 6.43 7.35 8.62 ) .. QlreLøtÌ BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5356.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 *' :ë 15.0 *' m 60 ~ ~ c .~ CD :J 1ã 0" :; 40 10.0 ~ E :J 0 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) , ' . ", '.:,' . '1",1' , I ' ",i';IPål:1lcle~ Slze¡:DI$trU) !J~~i1 i.', ',: } "', ,,'I: 1.'il"." ,"iJ,II"i.:I(1 " ,'" ,,' ,II ,I:' "., ,;'1," .'.'..' ,:',: " DI~meterl,": ii¡'li,ll}iil:~I i":I.\I" ,,',': 'We)Qhtl~II", ,.,"~ :" ,.'I'II~OSMe$lll,I':, ','.'. 'I nn;1' ',I, ,"I il:rtn'm1 '1'li'",'lifl,4iI:'1,I,," ~'," nr..~1!1I':I:I;¡,llrcuAA;i':", 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ....................... ..2·0......... ..Ö:Ö33T...... ö:ä4öö......... ö :25...· -.....0·.'1'1'.........· ö: 11..... Coarse 25 0.0280 0.7100 0.50 0.08 0.19 Sand 30 0.0232 0.5900 0.75 0.06 0.25 35 0.0197 0.5000 1.00 0.10 0.35 ........................ ·¡ö·..... ...·ö:ö 1·65·..... Ö·.42·ÓÖ.....·...1: 25.... -... ..ö:6ä...... .....r Ö3....· Medium 45 0.0138 0.3500 1.50 1.83 2.86 Sand 50 0.0118 0.3000 1.75 3.50 6.36 60 0.0098 0.2500 2.00 5.06 11.42 ....................... ..fo.......·.. ·Ö:ÖÖä3" ....Ö:2·1 ÖÖ·...·...· 2:25.... -. ...2·:ä3..........1 ¡: 25·... Fine 80 0.0070 0.1770 2.50 5.74 19.99 Sand 100 0.0059 0.1490 2.75 6.20 26.19 120 0.0049 0.1250 3.00 7.80 33.99 .... ........ ··..·····...14Ö..·······Ö:Öö4'1..·····Ö:·1ÖSÖ·....·..·:f25····-·..··~f55····..·..·¡3:54···· V. Fine 170 0.0035 0.0880 3.50 9.60 53.14 Sand 200 0.0029 0.0740 3.75 7.46 60.60 230 0.0025 0.0625 4.00 4.60 65.20 270 0.0021 0.0530 4.25 2.67 67.87 325 0.0017 0.0440 4.50 1.00 68.87 Silt 400 0.0015 0.0370 4.75 1.81 70.68 450 0.0012 0.0310 5.00 1.78 72.46 500 0.0010 0.0250 5.25 2.70 75.16 635 0.0008 0.0200 5.50 1.67 76.83 0.0006 0.0156 6.00 3.13 79.96 0.0003 0.0078 7.00 7.26 87.22 0.0002 0.0039 8.00 4.70 91.92 0.0001 0.0020 9.00 3.11 95.03 0.0000 0.0010 10.00 2.19 97.22 Clay 0.0000 0.0005 11.00 1.45 98.67 0.0000 0.0002 12.00 0.90 99.57 0.0000 0.0001 13.00 0.38 99.95 0.0000 0.0001 14.00 0.05 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 'il~,II',li.,i:,"i::';;i/ili'l,i.!~,I~$QHilnâ:,Stftlltl:C$i.(FåIIU1d::"!(i"'i'i'I"""lilll,:.,'I',;;:(I',\ 1', I " I ,I I ' , " I I' I ' ' " , I' , .. I 'I" I' II I I ' , ',' I, I ": ' .. ' ,', I' .:';, I, I , ,I I I ,I, 'I I' " ' , , I ' : I,;, " "I: ,: :' I ",' I I' I , :', ,~', I I " !/' 'II ,111.'1:1' ,':,1: I,I',' :~I~~,II~~ "III";III,'I','~,I'II, I:,'~''''II~",,!,I,,; ,':~I¡::,:: 1",',1,( "",: I': ,,::..: "': I' :'1\ III,'; ,,: ':,~I "'I"~! .'li':' 1"',',1"1: 'I: ,',,I¡:, :parameter,:,'", :il', ,I,I¡:a$K' '!I'·' ,,'.Inmiln-,',"" ;'¡I,.',Fb'K' ,.,.' IM.Ci:Ii( :t'!:¡:I:li,II'::'ill!i1i'I!'::lil:!III::II"I¡1ill,'I!li:I!'I'il!:li·'li:li:I:II:I:'il:!"I"I'I~.ry,:,,~e':läâ'~:i:I!!:81'3!edil!:':·:!II':I"':,!;II"':·:!:.:'1'1 (In) 0.0039 0.0039 0.0039 (mm) 0.0983 0.0983 0.0983 Meat\'11 ,.'i, Iii' ,..,"'!',':",.'. ISUtislz~~' ii: . 'ii' (In) 0.00377 0.00184 0.00236 (mm) 0.0957 0.0469 0.0600 Sôrtlng,' ,,: 'I I, Skewness' Kurtosis 2.507 WPóór 0.215 2.214 Strongly fin_skewed '. 0.670 0.877 0.507 Lepokurtlc 0.268 0.649 1.129 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 65.20 26.72 8.08 34.80 Percentile [Weight. Ofo] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phi] 0.01266 0.32167 0.01041 0.26431 0.00856 0.21744 0.00650 0.16516 0.00466 0.11845 0.00387 0.09834 0.00103 0.02627 0.00040 0.01010 0.00020 0.00508 0.00008 0.00204 1.64 1.92 2.20 2.60 3.08 3.35 5.25 6.63 7.62 8.94 ) . Care I.IIb BP Alaska MPS 261 Milne Point ') C.L. File # : 57111·103054 Sample ID : 5358.1 Sieve and Laser Particle Size Analvsis 100 30.0 80 24.0 ~ 0 ..; .J: 18.0 '#- m 60 'd') ~ !: c CD CD > :J ¡ 0" "S 40 12.0 .t E :J 0 20 6.0 0, 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I, ',' r "<',1' ',' ',' ',:,i" ""pärtl¿leiSIZeDIStrlblitied,','il,'"I,I,"'"", 'i:'",'i,,',.I'~' ',",'" ,,:iii,: " I \, ..,1 I ,II ,,', I' "'I',' "PI .' :ð."ft'" ,,'1., 1",:1"'11.,,, ,":, ,I'I' ':" ",'~I ,,', ,', I II ,j., 'I' kt,OJ :.11,:, ~I "I~ ',) "', : ,,' :':"1,1' I '~I~ ['II'" "'i/,I, , ,amV"",rl"" "',:,, ,.I:I,',"':~ 'il,,1 ":,"'1"",1""1':":' ':1"" ',: 'I" 1'1!~P"" '" ~~', "1'1' " ""': i,'rus, M8$h1i', ",',',:, : ,nn¡11',I,I,rrnm,I' ',"~iIIlr'i" l,i'flnc :1', i'll" rClim.l' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ........................ ·2,·6·...···.. ..Ö:Ö331·....·· ö:ä4öö········· Ö :25..·· -.... ·6·."2·1..······..· ö: 21..... Coarse 25 0.0280 0.7100 0.50 0.21 0.42 Sand 30 0.0232 0.5900 0.75 0.37 0.79 35 0.0197 0.5000 1.00 0.22 1.01 ........................ '46...·...... 'ö:ö 1"65.....· Ö:42ÖÖ...... ...1":25·... -.. ...Ö:3S....... ...1:3¡r...· Medium 45 0.0138 0.3500 1.50 0.42 1.78 Sand 50 0.0118 0.3000 1.75 0.47 2.25 60 0.0098 0.2500 2.00 0.77 3.02 ...................... ...7"6...·..... ..Ö:ÖÖŠ3...·.. Ö:2'1 öö......... 2:25·... -... "Ö:S2," ......... 3:64·.... Fine 80 0.0070 0.1770 2.50 2.29 5.93 Sand 100 0.0059 0.1490 2.75 5.08 11.01 120 0.0049 0.1250 3.00 9.14 20.15 ................... .....14·6...... ....Ö:ÖÖ¡1'"....· Ö:'1 ÖSÖ....... ..3:25·... -... ·1"2·.'41'"·...·.. 32:56.... v. Fine 170 0.0035 0.0880 3.50 12.60 45.16 Sand 200 0.0029 0.0740 3.75 9.61 54.77 230 0.0025 0.0625 4.00 5.72 60.49 270 0.0021 0.0530 4.25 3.16 63.65 325 0.0017 0.0440 4.50 1.17 64.82 Silt 400 0.0015 0.0370 4.75 2.21 67.03 450 0.0012 0.0310 5.00 2.30 69.33 500 0.0010 0.0250 5.25 3.44 72.77 635 0.0008 0.0200 5.50 2.04 74.81 0.0006 0.0156 6.00 3.85 78.66 0.0003 0.0078 7.00 8.12 86.78 0.0002 0.0039 8.00 4.92 91.70 0.0001 0.0020 9.00 3.20 94.90 0.0000 0.0010 10.00 2.24 97.14 Clay 0.0000 0.0005 11.00 1.49 98.63 0.0000 0.0002 12.00 0.93 99.56 0.0000 0.0001 13.00 0.39 99.95 0.0000 0.0001 14.00 0.05 100.00 . Distribution predudes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 i""',, '.," 'i 'i:, ,Sbrtlhg: Stltl.tl¡:S fFt:) (~ "1,';'1" ",i ,\',1,' ','" "'I""~"'''''' :"", ,""'"',,,' ~:I"""""""""'I""" I ""ii' : ,", ,,: ",I :,' ""'"1'1''' /," , ,;;:'."'::'·:':;~è~~Wî~t¿~;~,::':,,~,;,:,::, '"::I:',,i~~'$'It:,'~,:, ::::!I;l; ::,:!II~~~ril',:::!,',',i:,:'~I;: 'I.':::::':~~I~:;',II,~I ' I N!eCllâ¡:j ¡""", . ""1'1 :,I"i,; .,' '" :)feiiY,:flri8,'_â/'i'd,8Ized : ;;'.'" ':',' ' (In) 0.0033 0.0033 0.0033 (mm) 0.0851 0.0851 0.0851 Mean I SUt sized (In) 000285 0001..\5 000192 (mm) 0.0724 0.0368 0.0487 Sðlilna: Skewness i Kurtosiis . poor 2.417 0.257 1.994 , I 'Strongly fine skewed 0.601 1.065 0.620 Mesokurtic 0.320 0.708 1.077 Component, Percentages Gravel I Sand I Slit I. Clay I Slit + Clay 0.00 60.49 31.21 8.30 39.51 Percentile [Weight, %] Particle Diameter [In.] [mm] [phi] 5 10 16 25 40 50 75 84 90 95 0.00802 0.20373 0.00648 0.16468 0.00564 0.14332 0.00486 0.12357 0.00393 0.09987 0.00335 0.08506 0.00083 0.02115 0.00037 0.00947 0.00019 0.00488 0.00008 0.00197 2.30 2.60 2.80 3.02 3.32 3.56 5.56 6.72 7.68 8.99 ) . Care I.eb BP Alaska MPS 261 Milne Point ) C.L. File #: 57111·103054 Sample ID : 5454.0 Sieve and Laser Particle Size Analysis 100 35.0 80 28.0 ~ 0 E 21.0 '#- C) 60 ~ ~ c .~ CI) ~ -; 0- '3 40 14.0 .t E ~ 0 20 7.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ',,' ': .',.. ',;:t' I':' ',I" I,' I' I ""Plilril¿le"~'t~"nlstrl~utlQn""'" "": ,; "",' "'1""":'1' i,'." ,'", ",': "':',:,,",:,',"',1" ',""'", "',I\,~ ~' , ,.~rr";:-1 :"'1':" """""'1'" ""W'I"'i. I'" ""t':,"",,: "", ",': ""'~' ,':":"1,,.',,,,' "', "0..,, , ètFr , "'I,'i',':',i:,I""' ,'I'I'I,":"I'I~",II':i, I"~',' ,I, ", ",:":,~,~p~,~'r lII.:"",I',::.,,,,: "')' '" JUS Me$h1 :"',,I:"n~1',: I '., Irmm1 "I''',: ,','; Ildl1',1 .,'1,. "',,r nçla':,':',"r~dtri~l 'I 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.36 0.36 Sand 18 0.0394 1.0000 0.00 0.24 0.59 ,.."..."..,.,......,. ..2·0·'·...... ..Ö:Ö331"·'·..· ö :ä4öö..·....· ·Ö:25'·'· -.... ö': 1':2.....,..... ö: 71""· Coarse 25 0.0280 0.7100 0.50 0.00 0.71 Sand 30 0.0232 0.5900 0.75 0.00 0.71 35 0.0197 0.5000 1.00 1.22 1.93 ..,.",.,.,.,.,........ ..4·0·'·..·'·'· 'ö:ö 1"65·..·'· Ö :42ÖÖ··'..·.. '1' :25'·.. -..,. 4'.69'····..·'·' 6: 62'···· Medium 45 0.0138 0.3500 1.50 9.40 16.02 Sand 50 0.0118 0.3000 1.75 13.32 29.35 60 0.0098 0.2500 2.00 14.50 43.84 .............,........ ...fö·........ 'Ö:ÖÖä3.....· ö: 2'1 öö........· 2: 25.... -.. ...6.64·........ sö :49·..· Fine 80 0.0070 0.1770 2.50 10.56 61.05 Sand 100 0.0059 0.1490 2.75 6.65 67.70 120 0.0049 0.1250 3.00 3.64 71.35 ...................... ..14'Ö........ 'Ö:ÖÖ41"'" ...Ö:·1ÖSÖ·..·..... 3:25·... -.. ..·:2".ö·§·........ 73:43·... v. Fine 170 0.0035 0.0880 3.50 1.66 75.09 Sand 200 0.0029 0.0740 3.75 1.56 76.65 230 0.0025 0.0625 4.00 1.44 78.09 270 0.0021 0.0530 4.25 1.31 79.40 325 0.0017 0.0440 4.50 0.61 80.00 Silt 400 0.0015 0.0370 4.75 1.19 81.19 450 0.0012 0.0310 5.00 1.21 82.41 500 0.0010 0.0250 5.25 1.87 84.27 635 0.0008 0.0200 5.50 1.17 85.44 0.0006 0.0156 6.00 2.26 87.71 0.0003 0.0078 7.00 4.77 92.47 0.0002 0.0039 8.00 2.91 95.38 0.0001 0.0020 9.00 1.83 97.21 0.0000 0.0010 10.00 1.22 98.43 Clay 0.0000 0.0005 11.00 0.80 99.24 0.0000 0.0002 12.00 0.52 99.75 0.0000 0.0001 13.00 0.22 99.97 0.0000 0.0001 14.00 0.03 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 I: ,'I'::"" "':¡I<I::Sð'~IO'~,$tåtl:stl~:U;c)lk), ,,::',:' \1: :'1,":" ':,. ""', ,',l,'.'::,' ':; il,;I.~ .I': ": ',;,: ,":",: 1';:'1,:·:,1.'11' ":1,,1:+ :1, I'll, ,;,' : I 'I ",~ 1'1,' ',( ,", ~' 1:':\." :,',1"",::, ,1,",1,:; ~,I'''II:: }', :i !:',::I:,,~á'j:åh1étè~/:,,::"I: :':::,::!i:~äè~:"'::'i:'!I~'~~I1!.:,!,:,"I,:,~, ¡:ðllC :,',: ._lln"I!""'" "'1',.'11,1,:",;:,1,;1:,1':'1,::",::",:,:::,":1::,1,PI:tI.':·sla~'dlijl~ld~I""I:"I¡¡'",'I,' I (In) 0.0091 0.0091 0.0091 (mm) 0.2313 0.2313 0.2313 M,jlri I:~' 'i' :,~, (In) (mm) I', ";,¡:,::FlnijlsånClijlzed",r,· 'I: 0.00813 0.00389 0.00516 0.2065 0.0988 0.1311 SOl'tlng,I¡' " , : ','I,:,' , " 1.850 ',PQ()r:' 0.273 1.962 Skewness " ','I Strongly floe skewed 0.747 1.278 0.682 Kurtosis Very leptokurtlc 0.288 0.803 1.561 Component Percentages Gravel I Sar'ld I Slit I Clay I Slit + Clay 0.00 78.09 17.30 4.62 21.91 Percentile Particle Diameter [Weight. %1 pn.] [mm] [phi] 5 0.01801 0.45747 1.13 10 0.01588 0.40340 1.31 16 0.01426 0.36224 1.46 25 0.01258 0.31963 1.65 40 0.01041 0.26440 1.92 50 0.00911 0.23127 2.11 75 0.00368 0.09336 3.42 84 0.00106 0.02692 5.22 90 0.00042 0.01073 6.54 95 0.00017 0.00422 7.89 ) .. Q1œ lBI:i BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5512.0 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ ø :ë 12.0 ?ft. C) 60 '(ji ~ !: c ~ CD ~ :g 0" "S 40 8.0 e E 11- ~ 0 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) ,¡,"~ ',lil!:i,li'I!~¡III!"I"'I;li':!:<'!,':':':i," \ ;11)",', ¡1!:a'IPf~,': ,!î, "'rle,',':"',,I,~:~zlll,el ,1,10, ".II~t",:~.,',I",i!)""",~~,,~ø,,:,'"II'~i:]I,II!, ":I(:":':'I'~',tl~~i~',ii~:~',I¡i'~,~,";1~i!'¡~Clli~;::,li'I!:I:IIII,' I 1,:,: I I,I~;I' !I,I: ''i,'I'':;1 " I' ":''.;:,'::;, ,',1,1:: I I'.,' n~,~,~, ::.',:1 'I, :""',1":' ",',:' ~\, :,~,:"I,' ¡'i I:,:,: ,.1';:';'11": '.; ; ", ,', ,: I' 'rr"I:':~~~I~'¡:~~III~C :,'",:1...1';:'"1, II I ,li¡,[IJS;Methl !'I' """rht.ll"I""" Ii" 'I rmml'I'I'1 ,i rdll~( III, 1,li,tlijç ¡ll!1 '1,'II,I,I"r ' um;",,1 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ................ ........ ·2·Ö·........ ..Ö.'Ö331......· ö:ä4öö..... .... Ö::i5'''' -.... ·Ö·:ÖÖ..·...·.... Ö: ÖÖ·...· Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ ·¡Ö·..···..·· Ö.' Ö1 f35..··· ·Ö·.42ÖÖ·····..··:¡: 25.... -.... ·Ö.'ÖÖ·....·.... Ö: ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 ....... ··..·····..·······rÖ··..······Ö.'ÖÖä3······Ö:21ÖÖ····..···2:25...·-···..Ö:ÖÖ·....······Ö:ÖÖ..··· Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.00 0.00 120 0.0049 0.1250 3.00 0.00 0.00 ....................... T¡ö..·····.. ·Ö.'ÖÖ¡1······· Ö:'1 ÖSÖ·..·.... '3:25'" .-.... ·ö·:ö·ö···....··· 'ö: öö····· V. Fine 170 0.0035 0.0880 3.50 0.00 0.00 Sand 200 0.0029 0.0740 3.75 0.90 0.90 230 0.0025 0.0625 4.00 3.84 4.74 270 0.0021 0.0530 4.25 6.82 11.56 325 0.0017 0.0440 4.50 3.89 15.45 Silt 400 0.0015 0.0370 4.75 7.83 23.28 450 0.0012 0.0310 5.00 7.31 30.59 500 0.0010 0.0250 5.25 9.41 40.00 635 0.0008 0.0200 5.50 5.33 45.33 0.0006 0.0156 6.00 9.69 55.02 0.0003 0.0078 7.00 17.90 72.92 0.0002 0.0039 8.00 10.59 83.51 0.0001 0.0020 9.00 6.89 90.40 0.0000 0.0010 10.00 4.48 94.88 Clay 0.0000 0.0005 11.00 2.71 97.59 0.0000 0.0002 12.00 1.63 99.22 0.0000 0.0001 13.00 0.68 99.90 0.0000 0.0001 14.00 0.10 100.00 . Distribution precJudes calculation of these statistical parameters 0.0010 0.0002 0.0 0.0001 ,:'I~,:,il....,...;{;(;III';'I,II'I,;SQ~· Il'Iå,iStatI8~1~,~Ólk)I,'1 i,', '1'1,;11 " ~ 'I,: 1,1:·llr:~'I·,; 1:,,1'1 ,:.:1: I : ~" II:.;;,' ..:'I~ 11,;11,;1',:, ~.I::; ,1'/1: '~::': r ~,:¡I;~',,:, !';: :,'~ d":',':! ,; ::.:: I'::: i,:',I"1 ,}::.I.' :'::' I' ':: : ': '~ : II"'.':':~' , ,'" ~, ,,:,:,: I, i I'; ;I,:~ I I; ., ' I d :1' .""';I!I,pålfømétèfI1i'I:II; ""'I'IIT~å'kl,i'III.·.! "llninån,i,:,'I," ,,','Fd i(; 1.,.·1", 1l1iI;I.fii.lll;iil"!¡II!li'¡!li;::!'lili,I'III:li.;li,11,liiil',;III"'!:li!:,:I':!!"I,I:'I!I!i,I'I:;ilil;"¡;.i:ill·iIISill*¡:ljlft~II;'II¡I:II:I;I:!!!I,I',I:!llli'i!i:!II'·!!I'I!.,'I,.il,; (In) 0.0007 0.0007 0.0007 (mm) 0.0181 0.0181 0.0181 l\IIe.n,,:; I Silt sized (In) 0,00090 000052 ° 00058 (mm) 0.0228 0.0133 0.0148 '8011:1"g,/; ,! ;' .1" , ':PoÓ~;' 2.458 0.276 1.848 Skewness' :. Kurtosis I "Ströngl,yfineskewed 0.879 0.657 0.319 Mesokurtlc 0.304 0.636 0.959 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 4.74 78.77 16.49 95.26 Percentile [Weight, %] Particle Diameter [In.] [mm] [phI] 5 10 16 25 40 50 75 84 90 95 0.00251 0.06374 0.00219 0.05570 0.00190 0.04826 0.00154 0.03909 0.00102 0.02583 0.00071 0.01809 0.00025 0.00647 0.00015 0.00368 0.00008 0.00212 0.00004 0.00095 3.97 4.17 4.37 4.68 5.27 5.79 7.27 8.08 8.88 10.04 ) . Care Løti BP Alaska MPS 261 Milne Point ") C.L. File #: 57111-103054 Sample ID : 5521.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ 0 ~ .r: 12.0 ?fl. Q 60 ~ ~ u c ~ G) ::¡ ¡ 0" "S 40 8.0 e E LL. ::¡ 0 20 4.0 o 4.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 1.0000 ".,,' ;,."."..',",'";',"',:,:,.,,'~,',',",,'; "',",1.,,, " , "', " ',' " "~.,",',, '"." ",I,L,',',":,Ftårt,' i, CI, ~,", S, liZ, 8" ~D, ,lst"r,lb~,~,IO"h, ",,':,"',~,"I': I',',',;":;":': ',!',',"I~,;,~",',,"~.,',~,:;',I~,'~I,~I:',I,;,I',II,"',' :'.,11," 1..,larnøter. ';1<1',';::':'; i' ,':, ;',' !,,',"I,I,'.',;Wè "!1tNI:i"I"I" Ii" ;:I:,'rUSMesI11, " , "";irl"!¡11 ','I";,;; :'rml'Pl",' ".1, ,:'l',ldi!,n"'I"'!! ',1, 'irll1tl¡1~ ~n 'ulnA;, 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ."....,.,.,.....,..,.. ..2·Ó··..·"·'· ·Ö:Ö331··'·'·, ö:š¡öö'·,·....·ö :25.... -.... ·Ö:ÖÖ·'·..·'·.. ö: öö·.... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ...........,..........., ¡Ö..·..'... 'ö:ö 1 Ë5'5·..... ö:¡'2öö.........1': 25...· -.... 'ó':ó'ö' ......... ö: ÖÖ..... Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 .........,............. ..7"ó'...·... ..·Ö:ÖÖä3...·.. Ö:'2'1ÖÖ'" ·.....2:25·... -.. ...Ö:ÖÖ.........' ö: ÖÖ..... Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.17 0.17 120 0.0049 0.1250 3.00 0.87 1.04 .,.,.....,.....,..,.., ·"1·4'Ö..'··..· ·Ö:ÖÖ41'·'··'· Ö :·1ÖSÖ·......'· 3:25'" .-.,. ..2::3'9·....'··,· ·3:43'·..· v. Fine 170 0.0035 0.0880 3.50 4.59 8.02 Sand 200 0.0029 0.0740 3.75 6.86 14.88 230 0.0025 0.0625 4.00 8.31 23.19 270 0.0021 0.0530 4.25 8.36 31.55 325 0.0017 0.0440 4.50 3.82 35.37 Silt 400 0.0015 0.0370 4.75 6.59 41.96 450 0.0012 0.0310 5.00 5.46 47.42 500 0.0010 0.0250 5.25 6.93 54.35 635 0.0008 0.0200 5.50 3.91 58.26 0.0006 0.0156 6.00 6.69 64.95 0.0003 0.0078 7.00 12.85 77.80 0.0002 0.0039 8.00 8.08 85.88 0.0001 0.0020 9.00 5.55 91.43 0.0000 0.0010 10.00 3.95 95.38 Clay 0.0000 0.0005 11.00 2.49 97.87 0.0000 0.0002 12.00 1.46 99.33 0.0000 0.0001 13.00 0.59 99.92 0.0000 0.0001 14.00 0.08 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ,,;,,:,,;,;';::,II"I:iSo"ln~:Stàtl ¡tlC$(F:C)II(l:I':':::,1'i'" ',i',",,: . "I'li"'""""", '1:I:r!'iI1,:,il,,"",I,I.I':'I,;,'i ~!",;!:,'il.l:"'1,'11'" ,;, ¡I,I,·I'; ';,' 'i I ;1': ',I, ":.L :' Ii ;,11 '>'Påtårneter;:I,,"',I,taSIt:,I:lnman';,. '"',,",,,,;',:FÓhl:,',," N~tI 'b'I,;II:'.,I'I::!II:I.': Iii "I~;'I"I';',II' ,: 'I¡.'I',!,': ;1,1 ",,:,.,'I"ISUt'.IZö!:l':;' '.',.,11',';' '1,":: 'II (In) 0.0012 0.0012 0.0012 (mm) 0.0308 0.0308 0.0308 Miijij',,:, I",'" ¡',;i '; I,:;;,:';; , ' ,'.'.", ,; . 'Slit slüal',:"I::', (In) 0.00139 0.00072 0.00086 (mm) 0.0352 0.0184 0.0219 $Oñl,ng Skewness Kurtosis I !,¡~. Poor' 2.677 0.245 2.016 Strongly fh'leskewed 0.749 0.767 0.419 Mesokurtic 0.313 0.626 0.952 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 23.19 62.69 14.12 76.81 Percentile [Weight, %] Particle Diameter nn.] rmm] [phI] 5 10 16 25 40 50 75 84 90 95 0.00407 0.10329 0.00344 0.08739 0.00296 0.07517 0.00243 0.06183 0.00170 0.04315 0.00121 0.03083 0.00034 0.00863 0.00018 0.00451 0.00010 0.00245 0.00004 0.00106 3.28 3.52 3.73 4.02 4.53 5.02 6.86 7.79 8.67 9.88 ') A Care LIII:I BP Alaska MPS 261 Milne Point ) C.l. File #: 57111-103054 Sample ID : 5662.0 Sieve and Laser Particle Size Analvsis 100 25.0 80 20.0 ~ 0 .; .c 15.0 '#. 0'1 60 ~ ~ c CI) CI) > j :; C" :; 40 10.0 .t E j CJ 20 5.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) , " I .' :.:" '\",' .~.{ ,···'~"I,:,.II; p¡å~IC:Îe SI~,DI~t~lb~tl~~ :":!111 :,",,:.1 ;,1,1 ,~';'';':''I''~'' ,~I'~.::/ "',I.',.,., ',I .'. I.. ,II.". ,ID'~rn4il.rl\,',":"I.." ":,.".'I'!"'!I'"'",,',..,,, '.Welghtl~)~IJ,"" 1 ,',., ",.: ",'rOSM$shf, ,'. :'1 nn;l:' II" II,rmm1.,'II" '111!'lf,cIII1' ,,' II ,'tj.,tl¡l !,"'.rt~ml:1'1: 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ·'·..·'·..·'·'·'·..·'··..2·Ö "·'·'··'·Ö:Ö331'·'·..·ö:ä4öö·'·..·'·'Ö:25·'..-'··'·Ò·.'2'.:¡.,.". "·'Ö:2:;....· Coarse 25 0.0280 0.7100 0.50 0.24 0.51 Sand 30 0.0232 0.5900 0.75 0.43 0.94 35 0.0197 0.5000 1.00 0.21 1.15 ..,......, """""""'4'Ö"""""Ö:Ö16S"'" 'Ö:42ÖÖ..·'·'..·1·:25··'·-·..·'Ö:2·3'·'·'·....:¡:3ä'·"· Medium 45 0.0138 0.3500 1.50 0.19 1.57 Sand 50 0.0118 0.3000 1.75 0.13 1.70 60 0.0098 0.2500 2.00 0.50 2.20 ·...·....·.....·..·.....·.:¡Ò·...'......Ö:ÖÖä3......Ö:2"1ÖÖ·...·...'2:25...·-.....Ò·:.:¡6·...·......2:96....' Fine 80 0.0070 0.1770 2.50 3.69 6.65 Sand 100 0.0059 0.1490 2.75 8.11 14.76 120 0.0049 0.1250 3.00 12.44 27.20 ··'·..·'·'·..'·..·'··'··1'4'Ö·'·'·'·..Ö:ÖÖ41·....' 'Ö:"1ösÖ'·..'··'·3:25··'·-·..·1·fi'S4··'·'·'·'4Ö:74·'.. v, Fine 170 0.0035 0.0880 3.50 10.47 51.21 Sand 200 0.0029 0.0740 3.75 5.89 57.10 230 0.0025 0.0625 4.00 2.88 59.98 270 0.0021 0.0530 4.25 1.91 61.89 325 0.0017 0.0440 4.50 0.96 62.85 Silt 400 0.0015 0.0370 4.75 2.07 64.92 450 0.0012 0.0310 5.00 2.22 67.14 500 0.0010 0.0250 5.25 3.41 70.55 635 0.0008 0.0200 5.50 2.13 72.68 0.0006 0.0156 6.00 4.01 76.69 0.0003 0.0078 7.00 8.72 85.41 0.0002 0.0039 8.00 5.49 90.90 0.0001 0.0020 9.00 3.51 94.41 0.0000 0.0010 10.00 2.40 96.81 Clay 0.0000 0.0005 11.00 1.64 98.45 0.0000 0.0002 12.00 1.04 99.49 0.0000 0.0001 13.00 0.45 99.94 0.0000 0.0001 14.00 0.06 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 "',.:'11'.' .~",:" .~IIII·.. ,::".I:S~'~i~~ S~t'S~I~"(fqlk~,I.111 ,1,'1, ..,1"'..1,..',,1 1,;,1' "I ~: ',I; 1.11 'I', :" ',I, II' :1.. ~:"I :; ,', : :II:~: I, ,II 'I ~I:I " i, '''';',:'': "I :<,1· .,:,' I "", 'I:" (, ":" .;{: I '; 11:' :1' ..1"1,;,1 ',,' I : '1,1;: : I' .',,': , I,I~ :"Aararn~ter 11'IIIII""I:J:rä'I<:"'I·Ii"lnman.II'¡,I,!!I'I.Folkr.!,: ~M8CI~ån!I!I:,I¡i:·:!I!lii:,!!li.,III!¡;,:.I..:I!i;¡:li'iliil:I¡i!i!!!I¡:'I!i!i'I'II.i¡¡:¡IIII!IIIV¡¡~lfln~I!_í.nIIii!il ZÎ~I:llil.'::·ii,.'I'i¡..i!i.,,¡i:i'·' (In) 0.0037 0.0037 0.0037 (mm) 0.0947 0.0947 0.0947 ".86,·i "'II!\,I . r ,', i,' ISUtsli.tI'.i;' ,','.',.: II.i (In) 0.00304 0.00141 0.00195 (mm) 0.0773 0.0359 0.0496 Sorting Skewnêss Kurtosis ·,·'·'·'1; ",'. Wpoor','. 2.807 0.229 2.105 Strongly fine skewed 0.516 1.097 0.668 Mesokurtic 0.350 0.620 0.947 Component Percentages Gravel I Sand I Slit I Clay I Slit + Clay 0.00 59.98 30.92 9.10 40.02 Percentile (Weight, %] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phI] 0.00805 0.20452 0.00690 0.17521 0.00617 0.15660 0.00540 0.13721 0.00441 0.11204 0.00373 0.09469 0.00069 0.01741 0.00032 0.00824 0.00017 0.00431 0.00007 0.00173 2.29 2.51 2.67 2.87 3.16 3.40 5.84 6.92 7.86 9.17 ) .. CDrIi!! 1Bti BP Alaska MPS 261 Milne Point ) C.L. File #: 57111-103054 Sample ID : 5676.9 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ :ë 12.0 ~ Q) 60 ~ ~ c ~ II) :J ¡ 0" :¡ 40 8.0 e E LL :J (J 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) 'I:,', ",.""", ,', ':! "':""I"::ÞåI1fÄløl$lze::DI.~rlbütlån.,'t' ilillli';,:,,'ilil,i',::,I,';;', :I,"!I'",":,!"", I ' ,·""~'~:'S';'~.e'·. S'" 1'1',11'.' ,,;", Di~R1~ter "I'" .:",1"",",1, 1',,1 i' ,"""',1:';"""'·,'",,..1: ,i,II'I~"':' ,',,, "'I,,~e!pt:lf,~lqi"II',':":"! 1\11 ~'"lnn,l': \":",!rmm11',:llrl"'~"ill "'i Jlncl¡1'I,I,I",'lrCUM11' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 V Crse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ..... ................. ...2·Ö........ ...Ö:Ö3'3'1...·... Ö:ä4ÖÖ......... ö: 25·... -... ..Ö:23·.........· Ö:23..... Coarse 25 0.0280 0.7100 0.50 0.20 0.43 Sand 30 0.0232 0.5900 0.75 0.28 0.71 35 0.0197 0.5000 1.00 0.04 0.75 ........................ ¡·Ö..·...·.. 'Ö:Ö1 Ë~5"''''Ö :4:¿ÖÖ'" ......1·:25....-.... ·ö·:öä·......... 'ö:ä '1..... Medium 45 0.0138 0.3500 1.50 0.09 0.90 Sand 50 0.0118 0.3000 1.75 0.24 1.14 60 0.0098 0.2500 2.00 0.50 1.64 ........................ ·]"ö···..··..· ·ö:ööä3'·..··· ö::¿'1 ÖÖ········ ·2:25..·· _.... ·ö·:3'4..·..···.. '1: gä..··· Fine 80 0.0070 0.1770 2.50 0.79 2.77 Sand 100 0.0059 0.1490 2.75 1.37 4.14 120 0.0049 0.1250 3.00 3.11 7.25 .... ··..·...··..········1·¡·Ö······· ··Ö:ÖÖ41·..··..ö:·1öšö..· ···..·3:25····_·····6.Ö·]"··..·····'13:32···· V. Fine 170 0.0035 0.0880 3.50 8.96 22.28 Sand 200 0.0029 0.0740 3.75 9.88 32.16 230 0.0025 0.0625 4.00 8.41 40.57 270 0.0021 0.0530 4.25 5.97 46.54 325 0.0017 0.0440 4.50 2.21 48.75 Silt 400 0.0015 0.0370 4.75 3.48 52.23 450 0.0012 0.0310 5.00 2.98 55.21 500 0.0010 0.0250 5.25 4.34 59.55 635 0.0008 0.0200 5.50 2.69 62.24 0.0006 0.0156 6.00 5.10 67.34 0.0003 0.0078 7.00 11.76 79.10 0.0002 0.0039 8.00 7.75 86.85 0.0001 0.0020 9.00 5.24 92.09 0.0000 0.0010 10.00 3.63 95.72 Clay 0.0000 0.0005 11.00 2.28 98.00 0.0000 0.0002 12.00 1.36 99.36 0.0000 0.0001 13.00 0.56 99.92 0.0000 0.0001 14.00 0.08 100.00 . Distribution precludes calculation of these statistical parameters 0.0002 0.0 0.0001 "',i"'';'''''' !"II 1,':!':'Sö~I~~:,'Statlstlcl,f¡::Olk\,'II:i, I' ''''','1/'''''','1'''''' ,'",I:i"'i',""""',1 ,'J~il,,",1,',I" "",I":"i'" ,:,."','i,I,"I,","I,,",,:'>'" ',i, ",,:!I,:!,P.tåmeté~I'" " 1"'lifM$k;,I',:;I'nmårf:,,I,,:.' 'i . Föll< " N eal~6i'::;::I':I';I:,,::",",:I: ;,: 'i,:"!"i", ,,:,i: '$ IH¡iz~d ;'I"il ", ",' I (In) 0.0018 0.0018 0.0018 (mm) 0.0460 0.0460 0.0460 Me'i!lrf"i 1'," 1;;,1"1,', (In) 0.00192 (mm) 0.0487 $ortlng' " Skewness' Kurtosis "iISUtsized:' 000089 0.0227 1"1':',',1 " , V;Poör"" 0.217 I) 00113 0.0287 II'i',,'!I'" 2.165 I StronglY fine skewed 0.627 0.818 0.488 Platykurtlc 0.332 0.592 0.893 5 10 16 25 40 50 75 84 90 95 0.00591 0.00477 0.00412 0.00347 0.00256 0.00181 0.00037 0.00019 0.00011 0.00005 0.15001 0.12106 0.10472 0.08802 0.06509 0.04598 0.00943 0.00493 0.00271 0.00116 3.054 Component Percentages Gravel , Sand I Slit I Clay I Slit + Clay 0.00 40.57 46.28 13.15 59.43 Percentile [Weight. %] Particle Diameter [In.] [mm] [phi] 2.74 3.05 3.26 3.51 3.94 4.44 6.73 7.66 8.53 9.76 ) . r.oœlllb BP Alaska MPS 261 Milne Point ') C.L. File # : 57111-103054 Sample ID : 5726.2 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ 0 :ë 12.0 *' 0') 60 ~ ~ (,) c .~ G) = ëã tr' "5 40 8.0 e E LL. = 0 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) I'i,,;;' ; , )"'Ii, I"~ i'~',"','P~rl, IF,,' le';S,I, 2:,'"e,· !D, ,IS, ttl, b" , uUa," :I,',~.',I;',.";"."\,"",'" ¡':,",';',I~,',""~,il:l: I' "ii',i, "¡~,I,"",".;, ,,' ,", 1'1'1' ;"'t" " ,,', l'Olåm~ter;'" , '11'1"1; I I' II';'" ,I,i,.',;::,1 ',II "I,i','I, ,.' 'I;We,p~~,,'/I/I!:,'1 ' "1111,' ~ :nJSMesh1' ,I , :',i', r 'n'.1"I','" .','rmlm1'"""',;ri',~llill!,,lli !"!::'nn'cil.l~I,,:,,'lreum;1" II 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ................. ........2·Ö·........ ..Ö:Ö3'3'1......· Ö:ä4ÖÖ...... ...Ö:25.... -.. ..ö·:öö........... Ö:ÖÖ..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ·..··..············..···¡Ö···········Ö:Ö1·S5······Ö:42ÖÖ..·····..1·:25..··-....·Ö·:Ö·Ö·...·· ····Ö:ÖÖ··..· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 .................. .......7"Ö.....·... ·Ö:ööš3'...... Ö: 21ÖÖ·.......· 2:25.... - .....ö:ö·ö.......·... ö: ÖÖ....' Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.38 0.38 120 0.0049 0.1250 3.00 2.56 2.94 ....................... ·14·Ö····..·· ·Ö:öö"41"····.. Ö:·1ÖSÖ··....... 3:25..·· -.... ·s:öö....··...·· ä: 94..··· V. Fine 170 0.0035 0.0880 3.50 8.54 17.48 Sand 200 0.0029 0.0740 3.75 9.14 26.62 230 0.0025 0.0625 4.00 8.09 34.71 270 0.0021 0.0530 4.25 6.40 41.11 325 0.0017 0.0440 4.50 2.62 43.73 Silt 400 0.0015 0.0370 4.75 4.44 48.17 450 0.0012 0.0310 5.00 3.80 51.97 500 0.0010 0.0250 5.25 5.17 57.14 635 0.0008 0.0200 5.50 3.07 60.21 0.0006 0.0156 6.00 5.64 65.85 0.0003 0.0078 7.00 12.22 78.07 0.0002 0.0039 8.00 8.05 86.12 0.0001 0.0020 9.00 5.44 91.56 0.0000 0.0010 10.00 3.77 95.33 Clay 0.0000 0.0005 11.00 2.45 97.78 0.0000 0.0002 12.00 1.50 99.28 0.0000 0.0001 13.00 0.63 99.91 0.0000 0.0001 14.00 0.09 100.00 . Distribution precludes calculation of these statistical parameters 0.0010 0.0 0.0001 0.0002 ;;:"!':;i,'I',it', ;,.p,,'!¡I~ônlnâ'StåtlstICl¡~Fblk):,i ,'",;"";,,,':1' '.::"'" i";:'I"" ".,',;., p"',, 'I 'i' '1,,1' "'I" "I"" 1','," ""1"11,1"',;"""", ," ",i, I :', "III" "", I',' '" ",':',1;1,:,' ,j,' I ',: I';":; .\;:', '::II·~I':I'I, ", li",,:~:'1 ",1<, I, .1,1,' '1','.'. ,1',,1:., 'l:"' 'k" '.I'.; I ., d ,I " :1 :1,.,;,~JII:l¡ ' I' (' I;'." '" "I" ",111," ":',:' ':, "',: ",.I"',Þarameter,':," '; '~ra$ ,', ,,'Inm'," ,;",",' I: FbllC;;' ',:, "8~h¡ij' !"I 'II'!;:¡"¡I! ',' ~". . ',' II. '. ,,1;".':.1 ,I '," ¡". I,'. ,'" "$llt '.I~ätl';,; :,'1, ¡"'~. ¡'llit.' ,i' "1'. (In) 0.0015 0.0015 0.0015 (mm) 0.0374 0.0374 0.0374 Måån",'!" 'I" . 'Sutsizecf' '. (In) 00017.1 000082 0.00100 (mm) 0.0442 0.0209 0.0254 Sonlnå " ','1 V.poor· 0.220 2.135 3.008 Skewness , ".Strongly fh,eskewed 0.708 0.782 0.440 Kurtosis Platykurtlc 0.335 0.572 0.887 Component Percentages Gravel } Sand I, Slit I Clay ) Slit + Clay 0.00 34.71 51.41 13.88 65.29 Percentile Particle Diameter [Weight. %] [In.] [mm] [phi] 5 0.00488 0.12387 3.01 10 0.00427 0.10834 3.21 16 0.00375 0.09531 3.39 25 0.00314 0.07965 3.65 40 0.00218 0.05540 4.17 50 0.00147 0.03739 4.74 75 0.00035 0.00880 6.83 84 0.00018 0.00460 7.76 90 0.00010 0.00251 8.64 95 0.00004 0.00106 9.89 ) ~,...., .& Iin! lIItì BP Alaska M PS 261 Milne Point ') C.L. File #: 57111-103054 Sample ID : 5733.1 Sieve and Laser Particle Size Analvsis 100 20.0 80 16.0 ~ 0 :ë 12.0 '#. 0) 60 ~ ~ (.) c ~ CI) ::::I :¡:¡ 0- CIS 40 8.0 e '3 E u. ::::I CJ 20 4.0 o 4.0000 1.0000 0.2500 0.0630 0.0150 0.0042 Particle Diameter (mm) , ',,1,1"\ '~i~ "i", , ' " ,; ,: :.\.', I,,',,',', Pattie, l,e,',,',;,I~Iä:, ~,',!,P" " "I.,'~,~, ,I,b,,', u",', ", 0,.,'";,1,1,'1,:':,1, '~',', ',',¡¡,I';,:'~':!I,',;,"'~,',",',I,lt',:II'il"';:,I"II',:.:I, ,::""",.,::, ",:", ,11"1:,", ",'I, 'DJai:r!èter:'\ "',,,1":"'1"': ',''''.:~r .""'I',!',,i' :,,!,~;'I"I"Welah~'I%I';"';' , 1'1,'1' fUS Mè~h1!:' 1;'1' :"nri;~: ;':':' l'i,lrmtri1i':, , :,',tl~I~'t,!:, '1I"'d~I~Ih,'I'~('I:';'rOú'~~1,11' 5 0.1575 4.0000 -2.00 0.00 0.00 Granule 7 0.1114 2.8300 -1.50 0.00 0.00 10 0.0787 2.0000 -1.00 0.00 0.00 VCrse 14 0.0555 1.4100 -0.50 0.00 0.00 Sand 18 0.0394 1.0000 0.00 0.00 0.00 ......................... 2·Ö......... ·Ö:Ö331....... ö:ä4öö·........ Ö :25...· - .....õ·:õ·õ........... ö :öö..... Coarse 25 0.0280 0.7100 0.50 0.00 0.00 Sand 30 0.0232 0.5900 0.75 0.00 0.00 35 0.0197 0.5000 1.00 0.00 0.00 ........................ '4õ··..······ 'ö:ö 1·65..·..· Ö:42ÖÖ········ '1' :25.... -.... ·õ·:õ·õ····..··..· ö: ÖÖ....· Medium 45 0.0138 0.3500 1.50 0.00 0.00 Sand 50 0.0118 0.3000 1.75 0.00 0.00 60 0.0098 0.2500 2.00 0.00 0.00 .. .................... ...7·Õ..........·Ö :ööä3"·...· Ö:2'1 öö......... 2: 25....-.. ...õ·:õ·Ö.........·ö: ÖÖ....· Fine 80 0.0070 0.1770 2.50 0.00 0.00 Sand 100 0.0059 0.1490 2.75 0.11 0.11 120 0.0049 0.1250 3.00 1.61 1.72 . ....·····..············1"4·Õ··· ·······Ö:ÖÖ¡1····..·Ö:"1öSÖ·····....:f25····-·····¡:fä··..··....6:5Ö····· V. Fine 170 0.0035 0.0880 3.50 7.82 14.32 Sand 200 0.0029 0.0740 3.75 9.27 23.59 230 0.0025 0.0625 4.00 8.77 32.36 270 0.0021 0.0530 4.25 7.00 39.36 325 0.0017 0.0440 4.50 2.77 42.13 Silt 400 0.0015 0.0370 4.75 4.47 46.60 450 0.0012 0.0310 5.00 3.78 50.38 500 0.0010 0.0250 5.25 5.49 55.87 635 0.0008 0.0200 5.50 3.50 59.37 0.0006 0.0156 6.00 6.55 65.92 0.0003 0.0078 7.00 12.97 78.89 0.0002 0.0039 8.00 8.32 87.21 0.0001 0.0020 9.00 5.39 92.60 0.0000 0.0010 10.00 3.34 95.94 Clay 0.0000 0.0005 11.00 2.07 98.01 0.0000 0.0002 12.00 1.33 99.34 0.0000 0.0001 13.00 0.58 99.92 0.0000 0.0001 14.00 0.08 100.00 . Distribution precludes calculation of these statistical parameters 0.0002 0.0 0.0001 I':: ",I::', ;::ISQr;th'l:IiStåtlstlcafF:tdk)I':";"""'~' il. ;",' " I~, II'i'l: :';'I'j· (,:1',1 'I" 1',,',::": ',,";:'1 I' I'I:~,~":~I:,': :'11'; ,:,;, ':,1',; 'i,I',I,":: ": ':':'1,.'1 :i',1 :"i>'I(~'r " ,'::: I,;: I' :1':,:,;, ,,"i'II:':, I~I/~ 'I, ,',i: ' :,1" ,', ":'.11'";''' 't' 11.ill'" ' '~iI:.' ',' ;'" I, ,,",.' I.J "¡J~S;I,:" :." i "·1' ,'~iL" ';1, ",'"" ",II!, :"'I~ II' ~ '" !,I !', "',,, ' ' ""',1"8 iIIImet",r"..",,'I ""I,rc;lal( ,:, II" ,nmliln" " ,1"1",1,,.-01(, ,,' IVIW'I~~I:!;',:;:I,'lllillll,:!I'I,':JI:'II;'II;",":il:''!'III"",I:'::!;!!I','!¡"':"" 'II ISllt:I'IZêt:t"II"'J:.r ! "',i:I:II::"::I,,!,.':'!'1 : (In) 0.0014 0.0014 0.0014 (mm) 0.0346 0.0346 0.0346 Miâl);'I.",· ""1.,;";,,, ".: :1, ",>!' ";";'!"::"',,':$llt'.lzed::¡' " ,;",!""" (In) 0.00166 0.00083 0.00098 (mm) 0.0421 0.0211 0.0249 SOi'tll:'lgl.!I,1 " ",.1"" ",' '; " ,v.pbor·, 2.861 0.236 2.032 skeWh.S8 . Kurtœls . 'Strbnglytlneskewèd 0.757 0.731 0.403 Platykurtlc 0.333 0.573 0.884 Component Percentages Gravel I, Sand I 'Silt I Clay I Slit + Clay 0.00 32.36 54.85 12.79 67.64 Percentile [Weight, °4] 5 10 16 25 40 50 75 84 90 95 Particle Diameter [In.] [mm] [phil 0.00458 0.11642 0.00400 0.10150 0.00352 0.08945 0.00295 0.07494 0.00206 0.05243 0.00136 0.03460 0.00036 0.00916 0.00020 0.00500 0.00011 0.00287 0.00005 0.00125 3.10 3.30 3.48 3.74 4.25 4.85 6.77 7.64 8.44 9.65 ) ) WELL LOG TRANSMITTAL * I \q5~ 803~O(Q\ To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 May 30, 2003 RE: MWD Formation Evaluation Logs MPS-26, AK-MW-2435668 1 LIS formatted Disc with verification listing. API#: 50-029-23150-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-SunDrilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 RECE'VED BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 DatdUN 02 2003 Alatka Oil & Gas Cons. Corm\iMion And10rag8 ~O 3 -t'Co I Sjgned~F)~ ~~,,~ ~~ ~ fY\"s ~~!Æ~E ~ ) F !Æ ~!Æ~ ~~~ FRANK H. MURKOWSKIJ GOVERNOR ~ AI/A.SKA. OIL AND GAS CONSERVATION COMMISSION 333 W. ]TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)27~7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 i\nchorage,AJ( 99519 Re: Milne point Unit MPS-26i BP Exploration (Alaska), Inc. Permit No: 203-061 Surface Location: 3281' NSL, 296' WEL, Sec. 12, TI2N, RI0E, UM Bottomhole Location: 1139' NSL, 3174' WEL, Sec. 12, TI2N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced development welL This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmen.tal agencies, and does not authorize conducting drilling operations until all other, required perinits and approvals have' been issued. In addition, the Commission reserves, the right to withdraw'thè permit 'in the'~vel1t it was erroneously issued. ' Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of ·AS 31.05, Title 20, Chapter 25· of the Alaska Administrative Code, or a Commission order, or the tenris and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~./) ~ Randy Rue~rich Commissioner BY ORDER OF mE COMMISSION DATED this 2./ day of April, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section Hole 42" 12-1/4" 8-112" .) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test 0 Development Oil III Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 72' Milne Point Unit I Schrader 6. Property Designation Bluff ADL 380109 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-26i 9. Approximate spud date April 27, 2003 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 5933' MD / 4272' TVD 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 540 Maximum surface 1314 psig, Attotal depth (TV D) 4161'/1731 psig Setting Depth Top Bottom MD TVD MD TVD Surface Surface 112' 112' Surface Surface 2757' 2422' Surface Surface 5933' 4272' ftlt<:t: 1 a. Type of work III Drill 0 Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 565714, Y = 5999947 3281' NSL, 296' WEL, SEC. 12, T12N, R10E, UM At top of productive interval x = 562986, Y = 5997866 1222' NSL, 3043' WEL, SEC. 12, T12N, R10E, UM At total depth x = 562855, Y = 5997782 1139' NSL, 3174' WEL, SEC. 12, T12N, R10E, UM 11. Type Bond (See 20 AAC 25.025) Number 2S 100302630-277 12. Distance to nearest property line 13. Distance to nearest well ADL 025637,922' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 400' MD Maximum Hole Angle 18. Casing ~rogram Specifications Size Casinç¡ WeiQht Grade CouDlina 20" 92# H-40 Welded 9-5/8" 40# L-80 BTC 7" 26# L -80 BTC LenQth 80' 2757' 5933' Quantity of Cement (include staç¡e data) 260 sx Arctic Set (Approx.) 534 sx PF 'L', 334 sx Class 'G' 54 sx PF 'E', 157 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Structural Conductor Su rface Intermediate Production Liner Length Size Cemented MD TVD RECEIVED APR 1 0 2003 Alaska Oil & Gas Cons. Commission Anchorage Perforation depth: measured true vertical 20. Attachments III Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch III Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Sondra Stewman, 564-4750 21. I hereby certify that the foregoing is tl}le and correct to the best of my ~nOWI~~ge . J ~ . / Signed Pat Archey f 3> CL ~7' ...Ti:le, Senior Dnlhn~ Engineer Date S'/ I ~ / ð,3 ". !:CO~lsslonlJ$.On~~i' Permit Number API Number 3 5( -,,#~ro I Date See cover letter 2-0 ~- C::i:::.l 50- D2-9 - 2. / Ó" CD 7"/ 2.( ()~ for other reauirements Conditions of Approval: Samples Required 0 Yes J8fNo Mud Log equired 0 Yes ~o Hydrogen Sulfide Measures 0 Yes ISãNo Directional Survey Required ~ tJ No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K ~5K psi ~ Other: ~ \\ * '-~~"-\ ~\..)~\~\-l \.c~ ¡) KJ / ..1 by order of I-t' /" 1:< Approved By Il.G-....Á I ~ '-I- COmrTliSsiqnrN A -he commission Date II 'IV ~ 'l Form 10-401 Rev. 12-01-85 ) U ~'\ \ lJ i_Submit Triplicate ') ) Schrader Blun S..Pad Proaram MPS..26i Permit IWell Name: I MPS-26i Drill and Complete Program Summary I Type of Well (service I producer I injector): Injector Surface Location: 19981 FNL, (3281' FSL), 2961 FEL, (4983' FWL), SEC. 12, T12N, R10E X=565714.59 Y=5999947.90 Target Start Location: 40561 FNL, (12221 FSL), 30431 FEL, (2236' FWL), SEC.12, T12N, R10E "OB" X=562985.67 Y=5997865.82 Z=4161 TVDrkb Bottom Hole Location: 41391 FNL, (1139' FSL), 31741 FEL, (2104' FWL), SEC.12, T12N, R10E X=562854.94 Y=5997781.87 Z = 4,272 TVDrkb I AFE Number: 1 TBD I Ria: I Doyon 14 I Estimated Start Date: I April 27, 20031 I Operating days to complete: 111.0 I MD: 15933 I I TVD: 14,272 I 1 Max Inc: 154 I I KOP: 1400 I I KBE: 172.0 I Well Desian (conventional, slim hole, etc.): I Conventional Grass Roots Water Injector I Objective: 1 Schrader "OA", "OB" Mud Program 12.25-in Surface Hole Mud Properties: Density (pPQ) Funnel visc YP HTHP 8.8 - 9.2 75 - 150 25 - 60 N/A Spud - LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.5 < 8 < 6.5 8.5-in Intermediate Hole Mud Properties: Density (pPQ) PV YP HTH P 8.9-9.2 10-20 20-28 N/A LCM Restrictions: None Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS..4 or Phillips KRU 1 R. LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.0 < 8 < 6.5 1 ) Schrader Bluff S."'¿d Proqram MPS·26i Permit Cement Pro~ram Casing 9.625-in 40-lb/ft L-80 BTC surface casing Size Basis 2500/0 excess over gauge hole in permafrost interval. 400/0 excess over gauge hole below permafrost. Top of tail cement 500-ft MD above casinQ shoe. Total Cement Wash 20-bbl Water Spacer Vol: 455-bbl Spacer 50-bbl 10.3-lb/Qal un-viscosified Alpha spacer Lead 395-bbl, 534-sx 10.7-lb/gal Permafrost L - 4.15 fe/sx (cement to surface) Tail 68-bbl, 334-sx 15.8-lb/gal Premium G - 1.15 fe/sx to of tail at 1 ,923-ft M D Temp I BHST ~ 55°F from SOR, BHCT 60°F estimated by Halliburton Casing Size Basis 7.0-in 26-lb/ft L-80 BTC intermediate casing Top of lead cement 500-ft above top of Ugnu-sand. 00/0 excess over gauge. Top of tail cement 500-ft MD above top of N-sand. 400/0 excess over gauge. Total Cement Wash 20-bbl Water Vol: 70-bbl Spacer 30-bbI10.3-lb/Qal un-viscosified Alpha Spacer Lead 21-bbl, 54sx 12.0-lb/gal Permafrost E - 2.17 ft::S/sx (top of lead at 3974-ft MD) Tail 32-bbl, 157-sx 15.8-lb/gal Premium G - 1.15 fe/sx to of tail at 4,911-ft MD Temp BHST ~ 80°F from SOR, BHCT 70°F estimated by Halliburton Evaluation Program 12.25-in Hole Section: Open Hole: MWD/GRlRES IFRlCASANDRA Cased Hole: None 9.875-in Hole Section: Open Hole: MWD/GRlRES IFRlCASANDRA Cased Hole: SCMT 2 ) Formation Markers Formation Tops Base Permafrost TUZC NA NB NC NF Top OA Base OA Top OB Base OB * Based on SS depths MDrkb (ft) 1923 4474 5411 5454 5502 5598 5658 5701 5742 5773 TVDrkb (ft) 1822 3422 3968 3993 4021 4077 4112 4137 4161 4179 ) Schrader Bluff S;';ì-'ad Pro~ram MPS-26i Permit Pore Pressure (psi) Estimated EMW (Ib/gal)* 1539 1784 1796 1808 1833 1710 1720 1730 1738 8.65 8.65 8.65 8.65 8.65 8.0 8.0 8.0 8.0 CasinqlTubinfl Pro~ram Hole Size Csg/ WtlFt Grade Conn Length Top Bottom Tbg C.D. MD / TVDrkb MD / TVDrkb 42-in 20-in* 92# H-40 Welded 80' 0' 112' / 112' 12.25 9.625 40# L-80 BTC 2,757' 0' 2,757' / 2,422' 8.5-in 7.0-in 26# L-80 BTC 5933' 0' 5933' / 4,272' * The 20-in conductors are insulated! Recommended Bit Program BHA Hole Size Depth (MD) Bit Type 1 2 12.25-in 0' - 2,757' 8.5-in 2,757' - TD Smith FGXI Smith FGS+ Nozzle/Flow rate 3-15 & 1 -1 0 3-15 & 1-1 0 3 ) ): Schrader Bluff S';i-'ad ProQram MPS-26i Permit Well Control: Surface hole will be drilled with a diverter. Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: · Kick tolerance: 1 ,731-psi @ 4161-ft TVDrkb - Top of "DB" 1,314-psi @ surface (Based on BHP and a full column of gas from TO @ 0.1-psi/ft) 3,500-psi. An FIT to 11.5-lb/gal will be made on the 9-5/B-in casing shoe. 83.7-bbl with 9.2-lb/gal mud and FIT of 11.5-lb/gal @ 9.625-in casing shoe. 9.7-lb/gal brine · Planned BOP test pressure: · Integrity test: · Planned completion fluid: Drilling Hazards & Contingencies: Hydrates · Hydrates have not yet been seen on S pad, but have been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the permafrost (+/- 1 ,800-ft TVDss) but may be present in shallower SV sands and also as deep as 3,OOO-ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. · Watch out for deeper gravels below the permafrost or gravels that calve off within the permafrost and tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past, several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. We do not expect losses while drilling this well. · MPS-27: Lost returns cementing 7.0-in casing at approx. 800-ft MD. SuccessfuI1.0-in top job. · MPS-21: Lost returns cementing 7.0-in casing. Used TAM port collar at 1 ,OOO-ft with still no returns. SuccessfuI1.0-in top job. · H-06 (1995): Lost 100-bbl running 9-5/8" casing, good returns during cementing except no returns for last 20-bbl, contaminated cement to surface, cement 12 ft down, no top job. · H-05 (1995): Lost returns drilling at 5,360-ft (3,700-ft TVD), 40-bph to keep full, treated wi LCM pills for two days, total losses 838-bbl, made hole opener run with some continued losses. · H-05 (1995): Ran 9-5/8" casing, lost 46-bbl conditioning mud. · H-07 (1995): Lost 50-bbl running 9-5/8" casing. · E-24 (1998): Made hole opener run, worked tight spots 1965, 2620, 3465, 5900 and 6000, lost 72-bbl while circulating. 4 ) } Schrader Bluff S-Pad Proaram MPS-26i Permit · H-08A (1997): Had some minor losses while running 4-1/2" liner. · Follow the LOST CIRCULATION DECISION MATRIX in the well program if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 to 9.2-lb/gal mud. · Flow-check the well when the reservoir is entered. Pad Data Sheet · Please read the MPU S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Free Gas may be encountered below the Upper Ugnu. Faults · A 35-ft down to SE fault will be crossed in the Ugnu formation at 3,950-ft TVDss. · Well is being drilled into a complex structural area. The area is at the edge of both the Milne and NW Eileen surveys, causing poor seismic resolution. The well is placed at the southwestern edge of the graben to maximize the distance between S-26i and S-19A. · There is a region SW of the landing point where there appears to be a 20-ft D to the NE fault. However, the exact location of this fault is difficult to identify. It does not appear that this fault is in communication with any existing wells. There is a D to the NW northeast striking fault southeast of the landing point which is also planned to be crossed by MPS-19A. It is difficult to predict if this will provide a fluid conduit from S-26i into S-19A. · There is a 40-ft fault just NE of MPH-08B that may provide a fluid boundary between S-26i and H-08B. Again, due to poor seismic imaging, it is difficult to tell the continuity of this fault system. Hydrogen Sulfide · Milne Point S-Pad is not designated as an H2S Pad. Anti-collision Issues · None, except for consideration of planned wells. 5 ') ) Schrader Bluff S-Pad ProQram MPS-26i Permit DRILL & COMPLETION PROCEDURE Drillinq 1. MIRU Doyon 14, NU diverter. 2. Drill 12.25-in hole to surface casing point as per directional plan. 3. Rig up and run 9.625-in 40-lb/ft, L-80, BT&C casing and cement in place. 4. ND diverter. NU BOPE. 5. Drill 9.875-in hole to TD as per directional plan. 6. Sidewall core run. 7. Rig up and run 7.0-in 26-lb/ft, L-80, BT&C casing and cement in place. 8. RDMO Doyon 14. Completion 9. Run SCMT log. 10. MIRU Doyon 14, NU BOPE. 11. Test casing to 3,500-psi 12. Perforate well in NB and OA sands. 13. Run 2.375-in dual completion. 14. Test packer to 3500-psi 15. Install tubing head and Christmas tree. 16. RDMO Doyon 14. Spinner survey to be done after rig moves off location. 6 Plan: MPS-26 "1'02 (Plan MPS-26IPlan MPS-26 Created By: Ken Allen Date: 003 Checked: Date: Reviewed: Date: WELL DETAILS Noohing EasIing 5999947.90 565714. SURVEY PROGRAM o.pth Fro [)"pili To SUIY<)'iPlan Tool 33.00 900.00 Planœd: MPS-26 \\-¡-ß2 V5 CB-GYRO-SS 900.00 933.70 PIanœd: MPS-26 \\-¡-ß2 V5 MWD---IFR~MS NaIœ ~N'-S .fl-W Plan MPS-26 -2450 -630. latituœ LoogiOlœ Slot 70"24·37.087N 149"27'53.657W N'A Eastiog Shap< 563042.00 Cirel< (RMius: (50) TARGET DETAILS Næœ IVD .Ni-S ·fl-W Northing MPS-26 II 4113.00 -202250 -2690.74 5997902.00 SECTION DETAILS TVD +N/-S +EI-W DLeg TFace VSec Target 33.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 433.31 -2.33 0.00 1.50 180.00 1.39 1440.60 -238.57 -125.61 2.50 32.01 243.16 1774.81 -392.44 -234.28 1.50 63.07 422.18 1872.00 -437.17 -271.82 0.00 0.00 479.00 2350.14 -712.Q3 -610.12 4.00 34.3 7 914.48 4113.00 -2022.50 -2690.74 0.00 0.00 3366.05 MPS-26 TI 4185.00 -2076.02 -2775.72 0.00 0.00 3466.18 4272.40 -2140.99 -2878.87 0.00 0.00 3587.72 Azi 0.00 0.00 180.00 210.00 220.00 220.00 237.80 237.80 237.80 237.80 Inc 0.00 0.00 2.00 28.00 31.00 31.00 54.36 54.36 54.36 54.36 MD 33.00 300.00 433.33 1484.75 1868.56 1981.94 2634.57 5660.13 5783.70 5933.70 Sec I 2 3 4 5 6 7 8 9 10 Ö ('O~tI'ANY DE IAILS REFERENCE INFORMATION HI'Anlo'lol:() Co-ordinal< (NE¡ R<f<ren«: W<ll C"'lIre: Plan MPS-26. T"", North V""k31 (1\'0) Ref"""",,: S·Pa<! D<\' 72.00 ClIkuLtllo.m M.:II....'II.t. Mmm1U1II Cw\jJIlL"C &'''';00 (VSj Ref<rene<: SIn<· (O.OON.O.OOE) Error S)'sL.·m: IS("WSA Measured D<plb Refereoc<: S-Pa<! o.\' 72.00 Scan M.:lho.--",l ha..' Cyll(").1.'T r-.:1.}l'1h Caku1ation M~dxrl: Minimum Cu[\"atur~ hwr Surrac~: Elliptio;.al - Casing WamiTIjI: MCI!-,.,xf: Ruk.... UaSt.."d CASING DETAILS No. TVD MD Name Size 0- A 2422.00 2757.91 95/8" 9.625 4272.39 5933.69 7" 7.000 Sian Dir 1.51100' : 300' MD, 300'TVD FORMA nON TOP DETAILS -~/' No. TVDPath MDPath Formation SIan Dir 2.51100': 433.33' MD, 433.3I'TVD /' I 1822.00 1923.61 BPRF __~J_ . 2 3422.00 4474.18 TUZC - - 3 3968.00 5411.27 SBF2-NA - - 4 3993.00 5454.18 SBFI-NB 700 -go 5 4021.00 5502.23 SBE4-NC 6 4077.00 5598.34 SBEI-NF - r 7 4112.00 5658.41 TSBD-OA ¡ 8 4137.00 5701.32 TSBC 9 4161.00 5742.51 TSBB-OB .\60 10 4179.00 5773.40 TSBA5 (base OB) I -îJOC ~ - ~~ ## ;-. #' #' , ø wp02 SBF2-NA / SBE4-NC ~/ TSB t· TSBB-OB SBHH~'F I ' ---~ lrsB.c' / ~-~ I MPS-26 T¡Dl5-4JaSeOD. 7' 59BÜ' Mol 4272.4' -V,) I ! ! I I I I I I I 3500 All TVD depths are ssTVD plus 72'for RKBE. 1.51100': 1484.75' MD, 1440.6'TVD End Dir : 1868.56' MD, 1774.81' TVD 1981.94' MD, 1872'TVD 2634.57' MD, 2350.14' TVD --- ----- --- ------ ------- -- n : ···~t ~~~- ---- -r 4200-- -.- 1400 '2 2 o Ë .c g. 2100 o "'§ 'E ~ '" ::J ¡:: 2800 3500 - olal [ep h I , 2800 I ! I 400 2100 Vertical Section at 233.360 [700ftlin] -f---t-----j i .t----+-+--++-----1--++ I I I I I I I I I I I 700 I , -! I Plan: MPS-26 \\"p02 (Plan MPS-26lPlan MPS-26 Üe3ted By: Ken AJlen Date: Checked: Date: Date: SURVEY PROGRAM Depth Fm Dopth To SUTveyPlan Tool 33.00 900.00 PIannOO: MPS-26 "pOl V5 CB-GYRO-SS 900.00 5933.70 Planoed: MPS-26 "]>02 V5 MW"D'-IFR-MS REFERENCE l/o.'FORMA nON Well Centre: Plan MPS-26. True NoI11 S·Pad De\" 72.00 Slot - (O.ooN,O.ooEI S-Pad De\" 72.00 Minimum Cur~ctlure Co-ordinal:: (N"EI Reference: V'-'ftk.'al InTI) Rer~: Sð:tion (VS) R.efeœnce: ~kasured D<p!h Reference; Ca"'u!atien Method: bp o WEll DETAIlS !'lame -N'-S -E:-W NortIUog Easting: latimœ Longitude Slot Plan MPS-26 -2450 -630.71 5999947.90 56571459 70"24·37.087N l49"27'53.657W N'A TARGET DETAILS Nan» WD +~-S +E/-W Northing Ea5tiog Shape MPS-26 Tl 4113.00 -202250 -2690.74 5997902.00 563042.00 CÍ!\;1e (Radius; 150) SECTION DETAILS See MD Ine Azi TVD +NI-S +E/-W DLeg TFaee VSee Targe I 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 3 433.33 2.00 180.00 433.31 -2.33 0.00 1.50 180.00 1.39 4 1484.75 28.00 210.00 1440.60 -238.57 -125.61 2.50 32.01 243.16 5 1868.56 31.00 220.00 1774.81 -392.44 -234.28 1.50 63.07 422.18 6 1981.94 31.00 220.00 1872.00 -437.17 -271.82 0.00 0.00 479.00 7 2634.57 54.36 237.80 2350.14 -712.03 -610.12 4.00 34.37 914.48 8 5660.13 54.36 237.80 4113.00 -2022.50 -2690.74 0.00 0.00 3366.05 MPS-26 TI .~/ 9 5783.70 54.36 237.80 4185.00 -2076.02 -2775.72 0.00 0.00 3466.18 10 5933.70 54.36 237.80 4272.40 -2140.99 -2878.87 0.00 0.00 3587.72 Size 9.625 7.000 BPRF TUZC SBF2-NA SBFI-NB SBE4-NC SBEI-NF TSBD-OA TSBC TSBB-OB TSBA5 (base OB) CASING DETAILS MD Name FORMATION TOP DETAILS TVDPath MDPath Formation 1822.00 3422.00 3968.00 3993.00 4021.00 4077.00 4112.00 4137.00 4161.00 4179.00 95/8' 7" 1923.61 4474.18 5411.27 5454.18 5502.23 5598.34 5658.41 5701.32 5742.51 5773.40 2757.91 5933.69 TVD 2422.00 4272.39 I 2 3 4 5 6 7 8 9 10 No. No. ("akubtlllll ~kth.,d: Mmllnum CUf'\ ;:¡Iur~ tn:~r il~~~~~ ~~~~~'~rk1:r North ErTl)f' Surfa..:~; Ellipti¡;:'1 - (":\Sing Wðmi~ t.h1h.."t Rul..-s na'il..-d All TVD depths are ssTVD plus 72'jòr RKBE. Start Dir 1.5/1 00' : 300' MD, 300'TVD Start Dir 2.5/100' : 433.33' MD, 433.31 'TVD )ir 1.5/100' : 1484.75' MD, 1440.6'TVD , :::nd D* 1868.56' MD, 1774.81' TVD Stut"JÏÞ 4 100' : 1981.94' MD, 1872'TVD Enl" Dir : 253~.5TyHJ, 2350.14' TVD o ---.. .-f'"' ~ "Y~ ~ -# . y~ ....;11 .Q,' /' ~~ I 1200 I 600 o -600 i -I ___ ~ _1- I 1200 W est( - )fEast( +) [600ft/in] 800 -I TVrh I I --- t--- --L...- ---l---t I ----·1------- -r - ---- ---~ ---l=- --- -+- _ _ _ __~L>S~T .-.:-otal....")e JIh.:.S933_'" MD,A¡212 ___.J I I I I I -2400 - - - ~-+t' ---- - T~!- , ~ -- -·-\l~ - -- -\1PS-26 \\~O..j ~- _.-.1- -- -- ¡ I -3000 ~~- ---- - -- -- --- - -600 200 800 -2400 ~ ;:: o ~ ~ 1:: o ¡ o C/J BP KW A Planning Report MAP ') ') Company: Field: Site: Well: WelIpath: BP Amoco Milne Point M Pt S Pad Plan MPS-26 Plan MPS-26 . Date: 3/12/2003 Time: 14:25:55 Page: Co..ordinate(NE}Rderence: Well: Plan MPS-26, True North Vertical (TVD) Reference: S-Pad Dev 72.0 Seetion(VS)R.eference: Well (0.00N,O.00E,233.36Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: M Pt S Pad Site Position: Northing: 5999978.00 ft Latitude: 70 24 37.329 N From: Map Easting: 566345.00 ft Longitude: 149 27 35.171 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.51 deg Well: Plan MPS-26 Slot Name: Well Position: +N/-S -24.50 ft Northing: 5999947.90 ft Latitude: 70 24 37.087 N +E/-W -630.71 ft Easting : 565714.59 ft Longitude: 149 27 53.657 W Position Uncertainty: 0.00 ft WelIpath: Plan MPS-26 Plan: MPS-26 wp02 Date Composed: Version: Tied-to: Well Ref. Point 0.00 ft Mean Sea Level 26.28 deg 80.78 deg Direction deg 233.36 3/6/2003 5 From Well Ref. Point +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 6/29/2001 57460 nT Depth From (TVD) ft 0.00 Height 72.00 ft Principal: Yes Casing Points MD TVD Diameter Hole Size Name ft ft in in 2757.91 2422.00 9.625 12.250 95/8" 5933.69 4272.39 7.000 8.500 7" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 1923.61 1822.00 BPRF 0.00 0.00 4474.18 3422.00 TUZC 0.00 0.00 5411.27 3968.00 SBF2-NA 0.00 0.00 5454.18 3993.00 SBF1-NB 0.00 0.00 5502.23 4021.00 SBE4-NC 0.00 0.00 5598.34 4077.00 SBE1-NF 0.00 0.00 5658.41 4112.00 TSBD-OA 0.00 0.00 5701.32 4137.00 TSBC 0.00 0.00 5742.51 4161.00 TSBB-OB 0.00 0.00 5773.40 4179.00 TSBA5 (base OB) 0.00 0.00 Targets Map Map <- Latitude -> <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min See Dip. Dir. ft ft ft ft ft MPS-26 T1 4113.00 -2022.50 -2690.74 5997902.00 563042.00 70 24 17.192 N 149 29 12.503 W -Circle (Radius: 150) -Plan hit target '> ) ) BP KW A Planning Report MAP Company: BP Amoco Date: "3/12/2003 Time: 14:25:55 Page: 2 Field: Milne Point Co,.ordinåte(NE) Reference: Well: Plan MPS..26, True North Site: M Pt SPad Vertical (TVI» Reference: S..Pad Dev 72.0 Well: Plan MPS-26 Sec:tion(VS) Reference: Well (0.00N,0.00E,233.36Azi) Wellpath: Plan MPS-26 Survey Calculation Method: Minimum Curvature Db: Oracle Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ff deg deg ft ft ft deg/10OO deg/100ft degl100ft deg 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 433.33 2.00 180.00 433.31 -2.33 0.00 1.50 1.50 0.00 180.00 1484.75 28.00 210.00 1440.60 -238.57 -125.61 2.50 2.47 2.85 32.01 1868.56 31.00 220.00 1774.81 -392.44 -234.28 1.50 0.78 2.61 63.07 1981.94 31.00 220.00 1872.00 -437.17 -271.82 0.00 0.00 0.00 0.00 2634.57 54.36 237.80 2350.14 -712.03 -610.12 4.00 3.58 2.73 34.37 5660.13 54.36 237.80 4113.00 -2022.50 -2690.74 0.00 0.00 0.00 0.00 MPS-26 T1 5783.70 54.36 237.80 4185.00 -2076.02 -2775.72 0.00 0.00 0.00 0.00 5933.70 54.36 237.80 4272.40 -2140.99 -2878.87 0.00 0.00 0.00 0.00 Survey MD Inel Azim TVD Sys TVD MapN MapE VS DLS TFO TooVComment ft deg deg ft ft ft ft ft deg/100ft deg 33.00 0.00 0.00 33.00 -39.00 5999947.90 565714.59 0.00 0.00 0.00 CB-GYRO-SS 100.00 0.00 0.00 100.00 28.00 5999947.90 565714.59 0.00 0.00 0.00 CB-GYRO-SS 200.00 0.00 0.00 200.00 128.00 5999947.90 565714.59 0.00 0.00 0.00 CB-GYRO-SS 300.00 0.00 0.00 300.00 228.00 5999947.90 565714.59 0.00 0.00 0.00 CB-GYRO-SS 400.00 1.50 180.00 399.99 327.99 5999946.59 565714.60 0.78 1.50 0.00 CB-GYRO-SS 433.33 2.00 180.00 433.31 361.31 5999945.57 565714.61 1.39 1.50 0.00 CB-GYRO-SS 500.00 3.53 194.52 499.89 427.89 5999942.42 565714.12 3.68 2.50 32.01 CB-GYRO-SS 600.00 5.96 201.78 599.55 527.55 5999934.60 565711.50 10.50 2.50 17.51 CB-GYRO-SS 700.00 8.43 204.82 698.75 626.75 5999923.09 565706.59 21.36 2.50 10.27 CB-GYRO-SS 800.00 10.91 206.49 797.32 725.32 5999907.90 565699.43 36.24 2.50 7.25 CB-GYRO-SS 900.00 13.40 207.54 895.07 823.07 5999889.06 565690.01 55.12 2.50 5.61 MWD+IFR+MS 1000.00 15.90 208.27 991.81 919.81 5999866.62 565678.36 77.96 2.50 4.58 MWD+IFR+MS 1100.00 18.39 208.80 1087.36 1015.36 5999840.61 565664.50 104.72 2.50 3.87 MWD+IFR+MS 1200.00 20.89 209.22 1181.54 1109.54 5999811.08 565648.46 135.34 2.50 3.36 MWD+IFR+MS 1300.00 23.39 209.54 1274.16 1202.16 5999778.09 565630.26 169.77 2.50 2.97 MWD+IFR+MS 1400.00 25.88 209.81 1365.05 1293.05 5999741.70 565609.94 207.94 2.50 2.67 MWD+IFR+MS 1484.75 28.00 210.00 1440.60 1368.60 5999708.26 565591.09 243.16 2.50 2.43 MWD+IFR+MS 1500.00 28.10 210.43 1454.05 1382.05 5999702.03 565587.54 249.76 1.50 63.07 MWD+IFR+MS 1600.00 28.82 213.20 1541.97 1469.97 5999661.33 565562.77 294.08 1.50 62.69 MWD+IFR+MS 1700.00 29.59 215.84 1629.26 1557.26 5999620.91 565535.4 7 340.25 1.50 60.26 MWD+IFR+MS 1800.00 30.41 218.35 1715.87 1643.87 5999580.78 565505.66 388.25 1.50 57.96 MWD+IFR+MS 1868.56 31.00 220.00 1774.81 1702.81 5999553.45 565483.79 422.18 1.50 55.78 MWD+IFR+MS 1900.00 31.00 220.00 1801.76 1729.76 5999540.96 565473.49 437.94 0.00 0.00 MWD+IFR+MS 1923.61 31.00 220.00 1822.00 1750.00 5999531.58 565465.76 449.77 0.00 0.00 BPRF 1981.94 31.00 220.00 1872.00 1800.00 5999508.39 565446.65 479.00 0.00 0.00 MWD+IFR+MS 2000.00 31.60 220.78 1887.43 1815.43 5999501.20 565440.64 488.14 4.00 34.37 MWD+IFR+MS 2100.00 34.99 224.65 1971.02 1899.02 5999460.62 565403.72 542.07 4.00 33.70 MWD+IFR+MS 2200.00 38.48 227.91 2051.15 1979.15 5999418.97 565360.83 601.41 4.00 30.46 MWD+IFR+MS 2300.00 42.06 230.70 2127.44 2055.44 5999376.46 565312.19 665.87 4.00 27.85 MWD+IFR+MS 2400.00 45.69 233.12 2199.53 2127.53 5999333.28 565258.01 735.13 4.00 25.72 MWD+IFR+MS 2500.00 49.36 235.26 2267.05 2195.05 5999289.65 565198.58 808.85 4.00 23.97 MWD+IFR+MS 2600.00 53.07 237.18 2329.68 2257.68 5999245.78 565134.18 886.69 4.00 22.53 MWD+IFR+MS 2634.57 54.36 237.80 2350.14 2278.14 5999230.60 565110.81 914.48 4.00 21.33 MWD+IFR+MS 2700.00 54.36 237.80 2388.26 2316.26 5999201.87 565066.07 967.50 0.00 180.00 MWD+IFR+MS 2800.00 54.36 237.80 2446.53 2374.53 5999157.96 564997.70 1048.53 0.00 180.00 MWD+IFR+MS 2900.00 54.36 237.80 2504.79 2432.79 5999114.04 564929.32 1129.56 0.00 180.00 MWD+IFR+MS 3000.00 54.36 237.80 2563.06 2491.06 5999070.13 564860.94 1210.59 0.00 180.00 MWD+IFR+MS 3100.00 54.36 237.80 2621.32 2549.32 5999026.22 564792.56 1291.61 0.00 180.00 MWD+IFR+MS 3200.00 54.36 237.80 2679.59 2607.59 5998982.31 564 724.18 1372.64 0.00 180.00 MWD+IFR+MS 3300.00 54.36 237.80 2737.85 2665.85 5998938.39 564655.81 1453.67 0.00 180.00 MWD+IFR+MS ) } BP KW A Planning Report MAP Company: BP Amoco Date: 3/12/2003 Time: 14:25:55 ,Page: 3 Field: Milne, Point Co-:ordinate(NE}Reference: Well:, Plan MPS-26, True North Site: M'PtSPad Vertic,al (TVD) Reference: S7Pad Dev 72.0 Well: Plan'MPS-26 Section (VS) :Reference: Well (0.OON,O.00E,233.36Azi) Wellpath: Plan MPS-26 Survey Calcµlation, Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD MapN MapE VS DLS TFO Tool/Comment ft deg deg ft ft ft ft ft degl1 000 " deg 3400.00 54.36 237.80 2796.12 2724.12 5998894.48 564587.43 1534.70 0.00 180.00 MWD+IFR+MS 3500.00 54.36 237.80 2854.39 2782.39 5998850.57 564519.05 1615.73 0.00 180.00 MWD+IFR+MS 3600.00 54.36 237.80 2912.65 2840.65 5998806.66 564450.67 1696.76 0.00 180.00 MWD+IFR+MS 3700.00 54.36 237.80 2970.92 2898.92 5998762.74 564382.29 1777.79 0.00 180.00 MWD+IFR+MS 3800.00 54.36 237.80 3029.18 2957.18 5998718.83 564313.92 1858.81 0.00 180.00 MWD+IFR+MS 3900.00 54.36 237.80 3087.45 3015.45 5998674.92 564245.54 1939.84 0.00 180.00 MWD+IFR+MS 4000.00 54.36 237.80 3145.71 3073.71 5998631.00 564177.16 2020.87 0.00 180.00 MWD+IFR+MS 4100.00 54.36 237.80 3203.98 3131.98 5998587.09 564108.78 2101.90 0.00 180.00 MWD+IFR+MS 4200.00 54.36 237.80 3262.25 3190.25 5998543.18 564040.41 2182.93 0.00 180.00 MWD+IFR+MS 4300.00 54.36 237.80 3320.51 3248.51 5998499.27 563972.03 2263.96 0.00 180.00 MWD+IFR+MS 4400.00 54.36 237.80 3378.78 3306.78 5998455.35 563903.65 2344.99 0.00 180.00 MWD+IFR+MS 4474.18 54.36 237.80 3422.00 3350.00 5998422.78 563852.93 2405.10 0.00 180.00 TUZC 4500.00 54.36 237.80 3437.04 3365.04 5998411.44 563835.27 2426.02 0.00 180.00 MWD+IFR+MS 4600.00 54.36 237.80 3495.31 3423.31 5998367.53 563766.89 2507.04 0.00 180.00 MWD+IFR+MS 4700.00 54.36 237.80 3553.57 3481.57 5998323.62 563698.52 2588.07 0.00 180.00 MWD+IFR+MS 4800.00 54.36 237.80 3611.84 3539.84 5998279.70 563630.14 2669.10 0.00 180.00 MWD+IFR+MS 4900.00 54.36 237.80 3670.11 3598.11 5998235.79 563561.76 2750.13 0.00 180.00 MWD+IFR+MS 5000.00 54.36 237.80 3728.37 3656.37 5998191.88 563493.38 2831.16 0.00 180.00 MWD+IFR+MS 5100.00 54.36 237.80 3786.64 3714.64 5998147.97 563425.00 2912.19 0.00 180.00 MWD+IFR+MS 5200.00 54.36 237.80 3844.90 3772.90 5998104.05 563356.63 2993.22 0.00 180.00 MWD+IFR+MS 5300.00 54.36 237.80 3903.17 3831.17 5998060.14 563288.25 3074.24 0.00 180.00 MWD+IFR+MS 5400.00 54.36 237.80 3961.43 3889.43 5998016.23 563219.87 3155.27 0.00 180.00 MWD+IFR+MS 5411.27 54.36 237.80 3968.00 3896.00 5998011.28 563212.17 3164.40 0.00 180.00 SBF2-NA 5454.18 54.36 237.80 3993.00 3921.00 5997992.44 563182.83 3199.17 0.00 180.00 SBF1-NB 5500.00 54.36 237.80 4019.70 3947.70 5997972.32 563151.49 3236.30 0.00 180.00 MWD+IFR+MS 5502.23 54.36 237.80 4021.00 3949.00 5997971.34 563149.97 3238.11 0.00 180.00 SBE4-NC 5598.34 54.36 237.80 4077.00 4005.00 5997929.13 563084.25 3315.99 0.00 180.00 SBE1-NF 5600.00 54.36 237.80 4077.97 4005.97 5997928.40 563083.12 3317.33 0.00 180.00 MWD+IFR+MS 5658.41 54.36 237.80 4112.00 4040.00 5997902.75 563043.17 3364.66 0.00 180.00 TSBD-OA 5660.13 54.36 237.80 4113.00 4041.00 5997902.00 563042.00 3366.05 0.00 180.00 MPS-26 T1 5700.00 54.36 237.80 4136.23 4064.23 5997884.49 563014.74 3398.36 0.00 180.00 MWD+IFR+MS 5701.32 54.36 237.80 4137.00 4065.00 5997883.91 563013.84 3399.43 0.00 180.00 TSBC 5742.51 54.36 237.80 4161.00 4089.00 5997865.82 562985.67 3432.80 0.00 180.00 TSBB-OB 5773.40 54.36 237.80 4179.00 4107.00 5997852.26 562964.55 3457.84 0.00 180.00 TSBA5 (base OB) 5783.70 54.36 237.80 4185.00 4113.00 599784 7.74 562957.51 3466.18 0.00 180.00 MWD+IFR+MS 5800.00 54.36 237.80 4194.50 4122.50 5997840.58 562946.36 3479.39 0.00 180.00 MWD+IFR+MS 5900.00 54.36 237.80 4252.76 4180.76 5997796.67 562877.98 3560.42 0.00 180.00 MWD+IFR+MS 5933.70 54.36 237.80 4272.40 4200.40 5997781.87 562854.94 3587.72 0.00 180.00 MWD+IFR+MS )) Proposed MPS-26i dual string completiol Proposed OA Perfs 5658 - 5700' ~ ;'!¡i .~ ,~~~' ";. ,,;j"I, ",",', ","~, t !i~ ~' 'It,/ ,i,:; ','" I,:, t, ,:::;~ "I ~ ',I t¡ ");I~ ii' :,1: :','1:' I ,":/~ ,:<¡;~ ,. (f .)"I':,¡,' :i ';::;:, II... ", -"'"T ,,),1, :;::1 I !I;:~ !~ l~ ,:,I:I~ ......... '1 - ;i,', ,::1:, 1:,< 'I ~ ~ Proposed OB Perfs 5742 - 5773 ~- 20" 92# H-40 WELDED CONDUCTOR @ 112' MDITVD 2-3/8" 'X' nipples (set at - 3000' MD) ,. Freeze protect w/60 bbls diesel to 2,000' MD 2-3/8" 4.7# L80 IBT tubing strings ~ 9-5/8" 40# 1-80 BT&C @ 2757' MD/2422' TVD. Cmt W / (534 sxs/395 bbls) Artic light, 4.160 cuftlsx, Tail cmt: (334 sxs/68 bbl) Class "G", 1.150 cuftlsx. TOC at surface with full rtn. FIT = 11.5 EMW TOC @ 3,974' MD 2-3/8" "X" nipples (set 2 jts above GT packer) 7" x 2-3/8" Baker GT dual packer (set at - 5608' MD) 2-3/8" 4.7# L80 IBT pup jt (-10') 2-3/8" 'XN' nipple with 1.875" no-go 2-3/8" 4.7# L80 IBT pup jt (-10') Re-entry guide 7" x 2-3/8" Baker FH packer (set at -5720' MD) 2-3/8" 4.7# L80 IBT pup jt (-10') 2-3/8" 'XN' nipple with 1.875" no-go 2-3/8" 4.7# L80 IBT pup jt (-10') Re-entry guide with Model "E" Hydrotrip 7" 26# L-80 BT&C @ 5,933' MD;4272' TVD, (54 sxs/21 bbl) class E 2.170 cuftlsx, Tail (157 sxs/32 bbl) class "G" 1.15 cuftlsx TOC @ 3974' MD 2-3/8 Dual Strings with dedicated OA and 08 injection. I I I r I I I-. I I ! Î I I ~ --I I l I I I r I I r I I <:) I ø A.~~ J / ({/j'Q, .-- _T_ _ _ _T_ _ _ _T_ _ - _T_ ~ , ~ / *1 .34 .33 .32 .31i .30 MPS-28i29i MPS-26 27 25 .24i .23 .21i .20 .19i .18 i~gi .14 .13i = 11~ .10 . 9· .81 .7i -- ·.6 ii -- .2 .1 ") 21 I I ..j I I J I I I 1 I I ~ I I J .l Stcr - - -.1.- ---.. Sifr ~~ ~1<~. F?1Qt:- II r7<N ~ . F?77t '. I. I I -1 I -z--. I 28 PLANT J 15'00'00" GRIO- 35 3r~32 33 '. ~ 1 6 5 4 K-PA'D "~ ~PROJECT3 S-~AD 4 Js:tr=\ 12 ~ \ 8 9 10 MPU S-PAD 11 Ww 13 ~:: 18 a::: a::: LEGEND 16 15 17 14 ..- . AS-BUILT CONDUCTOR EXISTING CONDUCTOR VICINITY MAP N.T.S. NOTES: 1. DATE OF SURVEY: FEBRUARY 8. 2003. 2. REFERENCE FIELD BOOK: MP03-01 PAGES 28-29. 3. COORDINATES ARE ALASKA STATE PLANE, ZONE-4 NAD-27. 4. GEODETIC COORDINATES ARE NAD-27. 5. MPU S-PAD AVERAGE SCALE FACTOR IS: 0.999904923. 6. HORIZONTAL CONTROL IS BASED ON MPU CFP MONUMENT CFP-3 AND MPU H-PAD MONUMENT H-1. 7. ELEVATIONS ARE BPX MEAN SEA LEVEL BASED ON MILNE POINT PIPELINE VERTICAL CONTROL. SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF FEBRUARY 8. 2003. LOCATED WITHIN PROTRACTED SEC. 12, T. 12 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC GROUND SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS MPS-26 y=5,999,947.48 N= 2,236.64 70°24'37.083" 70.4103008° 38.4' 3,281' FSL X= 565,714.45 E= 6,583.75 149°27'53.662" 149.4649061° 296' FEL MPS-28 Y=5,999,940.28 N= 2,237.10 70°24'37.015" 70.4102819° 38.5' 3,274' FSL X= 565,685.79 E= 6,554.20 149°27'54.503" 149.4651397" 325' FEL o 2/08/03 Issum FOR INFORNAl1ON NO. DATE RE'-'SlON .¡.¡c KVIH BY CHK F. RObell 1. -- 1]__ --. i ffJ~[l)[bo ENCNmtS NC) 1.AND ~'t('I'OA'$ 1101 '!CST JW:tIaD LAN[ M04QRAOE. ALA$I(A De03 DRAWN: Obp COTTON CHECKED: O'HANLEY DATE: 2/09/03 DRAWING: FRB03 MPS 06-00 JOB NO: 1-= 160' MILNE POINT UNIT S-P AD AS-BUILT CONDUCTOR WELLS MPS-26 & MPS-28 1 OF 1 SHEET: SCALE: ';.' 1¡~r~'!~*/'1~~! Operat( X"PI:ORA TIO~ We MPS-20 / Fie: MILNE POI~ '<",:;;';>;;iy!'~D'bT" , Depth MD: 7,190.0 (ft) Est. TVD: 4,344.0 (ft) Progress: (ft) Auth Depth: 7,120.0 (ft) Hole Size: 8.500 (in) DOUDFS/Target: 6.75/6.00/11.10 Geologist: Vendi Engineer: Campbell Supervisor: Dixon / Willoughby ^ ~.;':, "),.., \" Current Status: 24hr Summary: 24hr Forecast: Comments: ) , , ~~~~ ) t.) ~" \~:....I'C\t. ~ ']:"0 (" Jlr~~ (,j~ '" f... V ~~w. , ',_ ,:~:':di:':<¿' r <', ~<;;B':EX~IZ.~~!1\I~N; :,::' . 'Dail, mlPeF_:t.i~~Á$10R~po'l1; ; Rig: DOYON 14 14 Event: DRILL+COMPLETE Well Type: DEVELOPMENT ;!ßurréfit,Welt:$.tatusj);§:'::;:;:!., ' Casing Size: 7.000 (in) Costs in: USD Casing (MD): 7,188.0 (ft) Daily Mud: 9,075 Next Casing Size: (in) Cum. Mud: 41,565 Next Casing (MD): 7,020.0 (ft) Daily Well: 224,640 Next Casing (TVD):4,298.0 (ft) Cum. Well: 1,087,011 ~:+.:~y;/ y. ';, '+";":-:>:P/':~" ' . ",;:".. Report: 7 Date: 2/15/2003 Rig Accept: 16:002/9/2003 Rig Release: Spud Date: 2/9/2003 WX Date: Elev Ref: SEA LEVEL Program: Weather: KB Elev: 72.00 (ft) Tot. Personnel: 43 Cost Ahead 200,000 USD, Days Ahead 1.25 -28 Wind 3 mph NE CF:-28 Installing well house on MPS-19a POH,rig run esg, circ,cement,set slips,nipple down, nipple up tree,move rig off well Rig up well house,move on to MPS-18,piek up pipe, spud well NO ACCIDENTS, NO INCIDENTS, NO SPillS, No MaC HSE & Well Control' All Free Days: 6 8/14/2001 Days Sinee last DAFWC: 410 last Csg Test Press.: 2,500 (psi) last BOP Press. Test: 2/12/2003 Next BOP Press. Test: 2/19/2003 last Divertor Drill (D3): 2/10/2003 No. Stop Cards: FIRE: FIT TVD: FIT EMW: MAASSP: T est Pressure: Kick Tolerance: Kick Volume: ROP Daily: Rap Cum.: WOB (min): WOB (max): RPM Min.: RPM DH: Torq. on Bottom: T orq. off Bottom: last Envir. Incident: last Safety Meeting: 2/15/2003 2/13/2003 Last Spill Drill: 2/13/2003 Regulatory Agency Insp: N KICK WHilE DRilL (D2)2/13/2003 Pump Slow Pump Rates (Circ) Stroke Rate PressureO Bits I Type I Serial # I Nozzles DS70FNPV 201573 11/11/11/11/11/111 Daily Hrs I Cum Hrs I Cum Rap BAA 3,000.0 Bha Weight: 7,190.0 WtBelowJars: ----Jts·-CengthCUmlength aD ID Blade aD Bend Angle (ft) (ft) (in) (in) (in) (0) 1.00 1.00 8.500 3.000 25.04 26.04 7.000 4.498 1.81 27.85 6.750 2.875 22.98 50.83 6.750 2.000 9.13 59.96 6.750 2.000 9.95 69.91 6.750 2.000 5.62 75.53 6.750 2.875 8.250 61.95 137.48 6.560 2.875 5.60 143.08 6.750 2.875 8.250 31.09 174.171 6.780 2.875 5.44 179.61 I 6.890 2.810 8.250 271.56 451.17 I 5.000 3.000 2,528.0 (ft) 11.51 (ppg) 330 (psi) 330 (psi) (ppg) (bbl) Rotating Weight: Pick Up Wt.: Slack Off Wt.: Circ. Rate Riser: Circ. Rate Hole: Circ. Off Bottom: Circ. On Bottom: Jar Hrs since Inspect: Bit Run # IRe-Run I Size (in) I Manuf. 2 8.500 Hycalog Cum Prog(ft) I RPM ~in/Max ¡WOB ~in/Maxl Non-compliance Issued: N Slow Pump Rates (Choke) Stroke Rate PressureO Slow Pump Rates (Kill) Stroke Rate PressureO _"_"_'_~~'W__"___~ -----..---.--.------- Operational Parameters Daily Bit Hrs: (hr) Daily Sliding Hrs:O.OO (hr) Cum. Bit Hrs: . Pump Status - Drilling and Riser Pump Type Eff. Strokes Liner Size Circ. Rate o 0 0 0 Ann. Vel. Riser: (Wmin) Ann. Vel. DC: (Wmin) Ann. Vel. DP: (Wmin) (hr) TFA (in2) IDepth In (ft) Depth Out (ft) 0.557 3,000.0 7,190.0 Condition A I X Bha No: 2 Depth In: Bha Type: DRILLING Depth Out: Component Component Detail BIT MOTOR SUB MWD MWD SUB STAB COLLAR STAB COLLAR STAB HWDP BIT MUD MOTOR FLOAT SUB MWD MWD HANG OFF SUB STRING STAB FLEX DRILL COLLAR STRING STAB FLEX DRILL COLLAR NM STRING STAB HWDP Connection Size (in) Type P/B 1 1 1 1 1 1 1 2 1 1 1 9 1.22 IF IF IF IF IF IF IF IF IF IF IF Printed: 2/16/2003 6:05:01 AM Operator: BP EXPLORATION Well: MPS-20 Field: MILNE POINT .. I,' ) ) :'<:: .."..,'! ~P{E}(R,~Ø~~I:~$,.,'." 'F<';;,;',.' E)ªiI"y"c!þp~·rå~i~m~rjRepom R~: DOYON 1414 Event: DRILL +COMPLETE Well Type: DEVELOPMENT \;BH~ .', hi : 3,000.0 Bha Weight: 7,190.0 Wt Below Jars: Jts Length Cum Length 00 10 Blade 00 Bend Angle (ft) (ft) (in) (in) (in) (0) 32.44 483.61 6.500 2.250 327.08 810.69 5.000 3.000 4.70 815.39 6.750 3.000 8.430 2.53 817.92 5.000 2.500 : Drming Fluid 2 (lb/100fF) Ca: 3 (lb/100fF) K+: 6.3 (cc/30min) CaCI2: (OF) NaCI: (cc/30min) CI-: 2 (/32") Sand: 12.50 (ppb) HGS: (ppb) LGS: 0.01 (mL) Pf/Mf: P'~$è,;:2 ô,f 3 Report: 7 Date: 2115/2003 22:30-23:00 0.50 INT1 DEMOB 7,190 -23:00-00:0Ö-- -1.oõ-- -r~n1 ï5rMOB---R[:f--------p~--------- Clean cellar, secureprpein-derrick~rem-õveffõW line,blowdowñ-ng--- 7,190 floor,PJSM Bha No: 2 Depth In: Bha Type: DRILLING Depth Out: Component Component Detail JAR HWDP STAB SUB JAR HWDP NM STRING STAB XO Type: Time/Loc: Depth: Temp: Density: Funnel Visc.: ECD: PV: YP: pH: LSND 15:00/PIT 7,190.0 (ft) 84 (OF) 9.15 (ppg) 40 (s/qt) (ppg) 8 ( cp ) 4 (lb/100fF) 8.1 10 sec gels: 10 min gels: Fluid Loss: HTHP Temp: HTHP WL: Cake: MBT: Lime: PM: From-To Hrs Phase Task Activity Op. Depth (hr) 00:00-02:00 2.00 INT1 CASE BHPULD 7,190 02:00-03:30 1.50 INT1 CASE TSTPRS 7,190 03:30-05:00 1.50 INT1 CASE RU 7,190 05:00-11 :00 6.00 INT1 CASE PU 7,190 11 :00-11 :30 0.50 INT1 CASE RD 7,190 11 :30-14:30 3.00 INT1 CASE CIR 7,190 14:30-16:00 1.50 INT1 REMCM CMT 7,190 16:00-16:30 0.50 INT1 REMCM 7,190 16:30-18:00 1.50 I NT1 BOPSU 7,190 18:00-19:30 1.50 INT1 BOPSU 7,190 19:30:20:30- --;COO- -TNTT-13oPsU-- 7,190 20:30-22:30 2.00 INT1 BOPSU 7,190 CMT NO NO NU NO RD 1 11 1 1 Connection Size (in) Type IF IF IF HT -38 P/B (mg/L) (mg/L) (%) (%) 200 (mg/L) 0.33 (%) (ppb) 56.70 (ppb) 0.01/0.6 (mL/mL) ES: Solids: Oil: Water: Oil/Water: Daily Cuttings: Cum. Cuttings: Lost Downhole: Lost Surface: (mV) 5.30 (%) (%) (%) / (bbl) (bbl) 362.0 (bbl) (bbl) Operations SUmmary Code NPT Operation P Finish laying down BHA, down load MWD tool P Pull wear ring, change top rams to 4.5 X 7, test door seals to 1,500 P Rig up to run csg, 200 ton elevators, 7" hand slips, franks fillup tool, PJSM Picking up 7" 26# L-80 BTC-Mod. csg to 7,190' P/U 210K S/O 95K, Total Jts 175, shoe @ 7,188', float 7,104' Rig down Franks tool and rig up cement head P P P Circ and reciprocate csg, with 5 bbls min 500 psi, PJSM on cementing P Cement with Hallihllrton, PU~~ãfër;lëSt'111l\es 3,500 15 bbls wat~.30 bbls Alpha sp e~ixøtl @ 10.2#, drop b m plug-o fly, pumpe~xs class E ·xed42.0#, 38 bbls, tail ith 175 sxs 38 bbls class G mixed @ 15.è#, w .....~.~es, d~~p.JoPþlu isplace Wi!y 272 bbls 9.7 brine displace @ 6 bbls ñiìrcfuTI return thu ou Job, bump plug with 1500#, check floats, Reciprocate 20 ft strokes until 1 0 bbls before plug was bump Rig down cement head P P Broke tubing head, and csg head, raise BOPS, and set slips with 125,000 # string wt. Rig up blow down nipple and 90 ft. of one in. pipe, displace csg of brine @ 90 ft.,rought cut csg, LID cut jt., final cut and dress csg at 7.5" Install 7" pack off, N/Utï)g-spoOï~¡est packoff 3,800 psi for 15 ----- min.(70% of csg collapse) Change top rams to 27/8 x 5" NID bops & set back,install false bowl (with no BPV), install 11 " x 7 1/16 adapter with master valve, test packoffto 5,000 psi for 10 min. Rig up HB&R Freeze protect 7' by 9 5/8 annulus with 60 bbls diesel P ------~----"-~--,.- P P P Printed: 2/16/2003 6:05:01 AM , 't ) ) Operator: SP EXPLORATION Well: MPS-20 Field: MILNE POINT From-To Hrs Phase Task Activity Op. Depth (hr) 00:00-01 :30 1.50 INT1 DEMOS RD 7,190 01 :30-03:30 2.00 INT1 DEMOS RD 7,190 03:30-06:00 2.50 INT1 DEMOS WOP 7,190 '. '" ',,' ",:':Bp::E~P~Þ~~'ON::,'l";:·i::,\'\;'" ::^,Ð~J:lY',~,p~rétiø"J$:R@;pqi~:: Rig: DOYON 14 14 Event: DRILL+COMPLETE Well Type: DEVELOPMENT " '06:ØO 'Up,däte:!',,; , Code NPT Operation PagEr:3,':9f,f3 Report: 7 Date: 2/15/2003 P Skid rig floor back, prepare for move P Move rig off MPS-20 to in front of MPS-17 P Wait on Production to install Flow lines and well house on MPS-19a Company No. 2 5 2 Personnel Company No. Hours SP 0 M-I DRILLING FLUIDS 2 SPERRY-SUN 2 Cumulative Phase Breakdown Planned Change of Scope NPT % Total WOW % Total Prod % Total NPT % Total DOYON PEAK OILFIELD SERVICES Hours Company No. 28 2 Hours SP DOYON SPERRY-SUN 0.00 0.0% 0.00 0.0% 0.00 Remarks 0.0% 0.00 0.0% 0.00 Total Hours 75.50 7.00 76.50 159.00 Total Cost USD 352,889.00 Phase SURF PRE INT1 TOTALS Prod % Total 75.50 100.0% 7.00 100.0% 76.50 100.0% 159.00 100.0% WOW % Total 0.0% 734,122.00 1,087,011.0 Printed: 2/1612003 6:05:01 AM ~ 0.4/17/2003 14: 25 FAX 907 564 4264 'f- BP EX~_LORATION -...,~:--,--",---,----.-.----,- .....~ @J 008 ) Legal Well Name: MPS-30 Common Well Name: MPS-30 Event Name: DRILL +COMPLETE Report #: Start: 2 2/1/2003 Spud Date: 2/2/2003 Report Date: ' 2/8/2003 End: 2/13/2003 Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 7,458.0 (ft) SO TMD: (ft) TMD Set: Top Set: (ft) Date Set: 2/8/2003 SO Date: Date Set: BTM set: (ft) Csg Type: PRODUCTION CASIN SO Type: Csg Type: Plug Date: Csg Size: 7.000 (in) SO TMD: Plug Type: SO Date: Drilled Out: Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: HALLIBURTON ;~:"\'!:;.)·!:::,::));)V,t· ~;.;;,;:r\;::;;i;.:i;:':f¡:,;>~:::;',·:E.:\:>,~~,!:,\?;;~.{/ij;·~¡~~~f~t~ji¡i:j¡i,;;;!~';f:~,;J:::,~~(i;!¡::j;¡::::~?!':~~i;):jjF':~þ"; à,!iti;::~i!:S~~.,,::··;:j Rot Time Start:: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Ree Time Start:19:00 Time End: 23:45 SPM: Stroke Length: 20.0 (ft) Drag Up: 250 (Ib) Drag Down: 75 (lb) r"I,"'~~~' ':,.'. ""I.,:,,'t;I.1I;~i~7f·1Jri~i t'~III~I'· "1 1,11'i.:,·,\.II~!; 1'/ ~;," If,. I1ro..; 11'1 ',E"' ,,~ ,,":, "'I :,~' "'-'1' I'i'.... IJ;: ''''111,'';'' ~·lt'rr..~r'\,~f,1:'1I'I"'~f"V~"WH'~"¡"~' il,;'1 '1,1 - ...,: ' "I.u¡,·' t .1., '~',¡..r.... ~',,:, "r~, " .,¡. 'rf"·I,, 1i ¡".;, ~,I.':I·, 11, ~ I i'''I~ :'il,í;rlt~"'~·'I!I.II: l >..1::; ','-';:)1 r':":':"I"':I~> ,<.,>:i, ,:,,'1: ~ I, :'; , ; :".~I' 'r ,~'. :"" 'i','::' ,:: ;":,, '::i 1~~,,:l\;,~>J;I:~F>'1 ~1~t~~.~i:¡¿i&~t¡¡~~ ~;¡!:¡I::;,\ .!':,:·:;~iI::i~ '~Li',"i", I'hY'I :~j¡','it;i;'il;¡;~,I¡'¡:'!~~: I;"~i::i;r~" ;~/:li¡~I;,.~ilr(~·;';'d:,:¡),1:":1·{;,lri:~~;;"'! 1 ::~ I'I'~',:,,; ',,' ;';i;,:,:',L~,:::','_,'.~t,\!~:;;.::j;': :::~; ~ !;:~:":,~:::;;"I:, ;:,';!;'.:: J'~:,';:.',: ;,':,: ~:::' :',I~::: ,;:: ";,; ':,.:;,:: ; ':;'~',;' ;!,~~,~":,~ ï,;:~'>¡~}i~~~~~:~;~~E~1':I':~J~,¡i~~{i!t.::I.i<;S:~~.';i';¡,:,:,):'i Lt~~',: :¡'¡~';¡~~.i:;}"~'~:~i!i:;',;:",':'!C:;~:'~ ~:j i:ii {,:,~':i::¡,.'i~1 !,i;';:~ ;'~:i ~~!;:ti;~ <':f:~ ~~:;;:\ Type: PRIMARY CEMENT Volume ,Excess %: 40.00 Meas. From: EST. GAUGE HOLE Time Circ Prior To Cementing: 2.00 Mud Circ Rate: 294 (gpm) Mud Circ Press: 600 (psi) Start Mix Cmt: 22:10 Start Slurry Displ: 22:00 Start Displ: 23:00 End Pumping: 23:50 End Pump Date: 2/8/2003 Top Plug: Y Bottom Plug: Y Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Floa~ Held: 6.00 (bbl/min) 7.00 (bbl/min) Y (ft) 1,500 (psi) 5 (min) Y Returns: FULL Total Mud Lost (bbl) Cmt Vol to Surf: (bbl) Ann Flow After: N Mixing Method: ON-THE-FL Y Density Meas By: DENSOMETER ,. r., "'~'.'~i. '. 'I r ',' "11' ~~';~~ f(' j,;.-' ~J "'j ju':f t~JI" 1 ~., .,.:·,'r.~. ~'~ ¡.::,. ,I ....,. ·1~lil., i 1:,'·1,.,', . ~.' Itir, ~': .~;~,.L,. ~'J".,, ¡~i~: !...l . j"f~ 'I r!J'-dI~ .;!111~, r~ìl'l ;1~(î'J~lpoI~nr~j,I.llrt'tlll -:.1,' .'~ r\ ."ìl~ .!JI .:' I "I ···.Ir.:~ .Jq I ~I:': :.,' ':" III', : -t. ~, f;!J.;:....'~' ,'.;:;,~ ; .~.,;,:' r,1 ;" ·W. '~~~' I.~;'·' ,Jf, '.. 'J;r: 1" ,;.. ': ' ,",I ,'...Ii;, ',~I:'; I"'·~..II'~ 'i~I"I'," .';, I ,", .'''1'''' , : :'.1' "'1:" ì ~,..,," ~': ,.",¡.,...; , : II.'''!·'~~I;I'~J¡ ~~~~I"I ~ "B"'I"HJI~ r"'IP I¡'íP,"'r' I{:':·II""'·':,ill~,I:~~1I1~~ 'r:~,~ '-¡II" J,~;¡',',:. "- ,' ~:' ";':"'('J r'J1:"'!I" '¡I':~"I,,:rll¡~ ;¡~"¡""I' Type: LSND Density: 9.30 (ppg) Visc: 50 (s/qt) Bottom Hole Circulating Temperature:60 (OF) Displacement Fluid Type:BRINE PVIYP: 13 (ep)/8 (1b/100ft2) Gels 10 see: 3 (lb/100ft2) Gels 10 min: 12 (lb/100ft2) Bottom Hole Static Temperature: 80 (OF) Density: 9.70 (ppg) Volume: 285.00 (bbl) [ ; ...1;I~oI :~:, ~I.'~:( ~ ':,. Il:{\:>' ~',J11: ~',;~ ì',~ ~ ~ :I;~? : :,"". r.', ~~' :: '", I. ~ ,:. <. '. ~~ :': . ~: 1:1' t\ ' "¡ I,;~ 'I~ I:~,f :~:.. ~~!t.rr-~~/~~\;:.: 'i~~ I 'l:¡:.~I ;U~'{~ .J'1~ ~~~~~ J ,r;;. lI~r, ~~': : '1.:11: ',::;'~L,.:I :'1 ',-(,.M.: .~~;~,r~r:. ~:r ,"'¡ f'~,:¡.; : ~:I; I..~;.. r~,,;, "rr; I~ ~ 1;:"I~"j¿:,I,.~;:'1 \;":1: "F"q , ~ I,. ,-r" ''''1., ". "1,.':'11 II',. ',';: ~ I ,.",/.1". ':"I_"".:i 'I' "1M' , :',,' ,I," 'I." " '., ,/1,",~"If" I f" "",.,1' ;;¡ \'1'b'j'.I ~'I~ It~ ÑI!~¡¡'/:J;,I""..jf.i !'o',,,r'l,' ",.;" ',-111,' ,¡" ", " "".:;1; I '. ~ ' "I ;, ".. 1'1" ," '''1, t,,·, ,.,11, .'" :i ',:"/!;,;~::,:~~'::!!:f:f:!:~>~'!:> :':.;I:;~:,I":: V ::;~:'I~;\'~:'~ii;'::,:" ~;~~', :,,':::I~,:~ ',::,t:,;'~ : "':;:<"',, ;i::~:'i ~~~~~~J~~i~~,~~~:~~~:i~~~~~~R;':;~!I.~~~~~,:i:,;',) :), 1:\:!~~:Pf:r.\t/:;;:',:j,!'í:..;,~/ ; ~;:~}:r)!~j, ::, :~t:;:'!>;,n~"\~;;:;':~,: :' '·i":'i Slurry Data Fluid Type: SPACER Slurry Interval: (ft) To: (ft) Water Source: lAKE Description: SPACER WATER Cmt Vol: (sk) Density: 8.30 (ppg) Slurry VoI:20.0 (bbl) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: (bbl) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Time Compressive Strength 1: Compressive Strength 2: Temperature: (OF) Temperature: (OF) Temperature: (OF) Purpose: SPACER Mix Water: () Foam Job: N Temp eF) rF) Pressure (psi) (psi) Printed: 2J2612Oro 11 :09:44 AM ì 04/17/2003 14:35 FAX 907 564 4264 -,-.-- ) BP ~;XPLORATIO_N ) @ 001/001 1:;;;,\X;::';;:\¡:;';¡P0~jj~;i~::!j0.\¡i~~~:¡,;;:~;:Zt'::~;!:;ritJ~f;,\t+~¡i:'!;ii:pi:~~~i1::~t1~~]iJM¡i~1~r~!:ti;zf~~;i¡J¡~~;ft~!:¡Ii~t~f~ . , ,! .',. , ".' ", "I I~~,rt.' lþ'" ,1/"/,,,'/1. 'nO;, ,"1"/.",,, ..1. , I I",'" ,. ". ' 'd'~¡"'" " ' /.' ,W"".;j"í" i.""', 'y¡ ,\t.,~. { ""/,\ ..' -'I"~,", , '1,1 .' ,'r,', ~'.-,' .,"',' 10''',1 ) J., ':', ',/' .'" '....¡./.,.., 1;::,/ ,;""",","," ".'j'l,." ,I ~' ,'" 'I" ",' (~ii;':~~,i~t2¡;~{?~f~r%\~t¡1J:t;j1:;~t:;~~::~10!¡;!;~r.~f\.~I{~~~'i~¡~.;!W;Í,f;;è:~j~~¡~ft;¡~~ì~~~~;;~~t1~1;!~îi~;~iJl;~ Legal Well Name: MPSw30 Common Well Name: MPS-30 Event Name: DRILL +COMPLETE Report #: Start: 2 2/1/2003 Spud Date: 2/2/2003 Report Date: 2/8/2003 End: 2/13/2003 " ",' , , '., I, ", ': '1,. ~:¡, ',t ~,I " ',' .:~ . ""'.:Y:'",.' I·;" " ' ':1" ".'" :' . :~" I",I~ r·:;'ê::"~ð.é:I;N' ô": 11'~.sjl)I' '~"*-I ..' U' ""Q~f4! ,1 '. :,. I,...,.! ~ 'Ir.': , "1,',~ ,., 'I !''íJ''" l ~~",,,",'.t'""~' .."I.., . i, ;J',. A .. .,11.,:.. .¡ ;'.",,' , ': ~'~',! .::. ;'::::~~: ~',:' :,' ; ':'¡;,~:~?:~/-r~::~'~,!J/:i,:::,~:~:';~ ,~.,,::.~.!;:~:,~;:': }', l ',~:, :t;,: ~: :.; ,:::;:t:i\: !('~/~~'1:~.' ;;;::~;;: 'r;¡,;j>.'I:;::;;"i<:r:7~.~~,;\ ~:~!~U;~::, :.': .,::~!,,¿r'::~ ')·~;'.:~:'??~:~~';?l': ;:'~;?>",:' '.T,:tl::'·)<\~·i~,!,:·"'i!;!,I:I'~' :t:';:~;i~,,~!t:: ':.<...~:i,~t :':'~':')i~ Slurry Data Fluid Type: SPACER Slurry Interval: ·(ft) To: (ft) Water Source: LAKE Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure:, ("F) Description: SPACER WEIGHTED Cmt Vol: (sk) Density: 10.20 (ppg) Slurry Vol:30,O (bbl) Water Vol: 37 .00 (bbl) Class: SPACER Yield: (ft"/sk) Other Vol: (bbl) Temp (OF) (OF) Purpose: SPACER Mix Water: 0 Foam Job: N Pressure (psi) (psi) C;,::,::..:::~:,:;:ii;:\;i;;:i'~;;;i;!~~i';:;i:i;~i;~::;!~,i;LT{;\'!Y!':;?i~!~¡¡~~~~~~¡~;:i~#{,~¡~~~1J~:iit}!,ï~¡1~~¡0ì~~:¡;~;~lr!;;,;;:f;i;¡;1::Jl}~:i:~~1;::~?~~}"¡ Slurry Data Fluid Type: CEMENT Slurry Interval: 4,900.0 (ft) To: Water Source: LAKE Test Data Thickening Time: 6.00 Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: eF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) 6,198.0 (ft) ....., Description: J,..EAE)'"Sr:URRY Class: E-CLASS Purpose: FILLER SLUR Cmt Vøl~~ (sk) Density: 12.00 (ppg) Yield: 2.170 (fts/sk) M~~.r-+1'.63 () Slur{~~~~9.0 (bbl) Water Vol: 21.00 (bbl) . ~~~er "~~~:.~bb.9""",,,,,,,,,,,,,,,,"'''·"'Foam Job: Y -~~.......-.~. ....~. ., ....._.--"~.._-.,,,.,..,.........................-~..._..."..,.......~....,, ....... . Description: TAil SLURRY 7,459.0 (ft) Cmt Vol: 188 (sk) Density: 15.80 (ppg) Slurry Vol:41 ,0 (bbl) Water Vol: 25.00 (bbl) Class: G-CLASS Yield: 1.150 (fts/sk) Other Vol: (bbl) Temperature: 80 (OF) Temperature: 80 (OF) Temperature: 80 (OF) Time Compressive Strength 1: Compressive Strength 2: Temperature: eF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Pressure '(psi) (psi) <':;:,,~;;/;:,;f(;r;¡iif;;~':~@!;;:;~;;t(~:~;::;~(};';:E;};:{(;~'/;:t~~~~~~:~!~¡:~~~~~w~~~~~f:~:~:(~Ì~¡~!~~!,J~;:~~tti1~~~~ik!¡~:~;~;:1;j:\¡:,!~~~;!~j1¡ Slurry Data Fluid Type: CEMENT Slurry Interval: 6,198.0 (ft) To: Water Source: LAKE Test Data Thickening Time: 4.35 Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: 80 (OF) Temp eF) (OF) Purpose: PRODUCTIO Mix Water: 5.00 0 ' Foam Job: N Pressure (psi) (psi) Prinl~: 2/2612003 11 :09:44 AM '..--..,--..---."-,.-.- , 04/17/2003 14:28 FAX 907 564 4264 BP EXPLORATION ')---;-'-'---"-'--:- , .',' , ,,' '¡, ..--"-..--..- ) f41009 ;," >,::" " ;~-:/"'r' ':':,\: :':;¿; ~j,1 ~~'I::;,~', :1,,:,', ','i:::' ;' :': :,'"'' ',:,1:, :,I\~::;': ~'i'~~::~,<, :',>,:: ~I ,:~~":'~~:r~ '::;:il:~fl',~?r{;~:i; :':,.:/"::'>: I;, 1!:'.:,i:I'~!;!:':i;:~;'I~r:"'~~:~f'~i¡~~~~~!i~~7;~~::I<'!.>~:..,y,~:':) ,:~,;.:,: ; ~,:.; ::i ;'::·;:::':~i~~:ç;;\",)·~,ç;~~;t',~f!:~;~:~:!i~;J~:\~'t~ j?.",:1;"~: 'f!J;,!::?::: Legal Well Name: MPS-30 Common Well Name: MPS-30 Event Name: DRILL +COMPLETE Report #: Start: 2 2/1/2003 Spud Date: 2/2/2003 Report Date: 2/8/2003 End: 2/13/2003 ,,;/,:'.. t.' n'," ~I ;;::'.'''~ ' "r~"g'<'"I"~~ "",,; :',,' ;' , , ":.:'."',':: .,'I.j'o,~,!, ;r'" :,~;b~r!,I{~~~~:';"'ì"I'¡," /,~':~ i'''',I ~é':r'¡'I'I'i~!I,;;''i:'' I' ;,~" ',I~; :, ,,:".'''~ 'iW~~·f:I~ ,'.fi ..!~,,~~~~~,,¡:I";,A~'r::":I~·r' ·:!~'W.'I:"''':':l,'':'1' ,;,:~ J."~.::"'''''·'¡''·''·'''I,''.!i.r.;..'·I!,I', .,7." .,',1111 ,"'.",il..111:·'.'I,lrl:'·I~III· ~:F' .,'1+:11, "·'1~;' 'I..... ~I:I....,. rlt"' I ·r".JH,.r"~"¡I''''I.t".'''.!;'·1 'r,I' :'11,.,," I,.,.,,'I;'II~~:",:.~:I')' ~ I L.tI,¡r,....", ·1..." ',",'.:I , :I ~, Test Press: (psi) For: (min) Cement Found between Shoe and Collar: Pressure: (ppge) Tool: Open Hole: (ft) Hrs Before Test: Liner lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: Tool: Tool: : ~..\~' ,I;: ." ~ ":> ~ í,; ~.~~ ~¡·:i~·r~,\'I:. .:: ~~/'~ :':i:~:,: I'; ',..~,~: "',\ \., >!,I~I,\ ../: '~I.\· ,':': \: ':.";~ I:: ~ ,II ~i;:I'I;:r I :;;;:,i:;! ~:/r;,~ ·":::.\"¡:I.I\;~;:;11:/~! ~!;~7;!.I',r~:·~·;~I;:~;:;:: './'1:; ;~,¡/t~;"~ 'rr~::.~ I. :'.~, ~í ,r .',,",.' !,'j". :, ,~,"~'; i II,_I~; ~.~·\:"~~I.~;{~~t~.:, ~~,:'~J:,~'~:,::\ff~ I ~\I ¡:~; ~lþr ' ~1 :I~. .:r'~I.l·;, :~,l .~~,f~ :' "', :', '. ,;,i.';b":g"·Î.süki;'~\i';'EVå'i'LI~'t'ilQ''': ~:^,",',' '" ~ ",'.I; ::, ":'¡:;:' ,;,'.i,:, ,I,:, 1,,::-,'.'1, I:,}:¡:¿,; ,~'I¡', "',¡·:i:I'~·!'I~ðtp~~~øtå~i~~.i';$iJl!û'r.¡:{~.~~",l.i,':~:'!'."::,"~' ,) 11",,~,,;j, rl~,':~.'I.'I::: .':, ';,:<'j:' ': ~. ii >' <'.' :':':;,'."',';':l::,'.,;! " :';:/j;" ': ,:,!/",~. ; '''','' " ',,;: :' i: ,::', ':',': .. ,~.'~,:,~,',':',~'·:",\':::"·,:: :J',''j,:,,:,:t¡:'":::';i ~//'.';'~~:.I,:,:",¡,,~,:~:::::, t .',·,f~/i~::~i,,~i,j';'; ~ii:': :,'o;;¡;. :,:,!:' : ::..':/: .. ;, ,,:.' ,.,',';' ~r~,'::\:;::;·:::¡~'~i~.\~;~I:':i;::t~:,,~;;, :~:;,~~~;';~,¡,i~~;:,~:,'i:::;;'~'<:, ':! eBl Run: Under Pressure: (psi) Bond Quality: Cet Run: Bond Quality: Temp Survey: Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: Job Rating: If Unsuccessful Detection Indicator; Remedial Cementing Required: Number of Remedial Squeezes: ;;,{{;';;!tij.f;~};!f:':t;~;i~);'i::f<\:,i,;!t;~j:¡:~~::%io't~::i;j)!{~j;;¡J~:'i~~~(iIjl~iJi~:i;'tì;!:,i:f;;:::i~~~¡;~;;f:!\;t;1ijt~ti!I!;!i~{~r~~4i~fii:~\1r!f:~~;ii~ Full Returns29.3 bbls of 12 ppg lead slurry tail 43 bbls of 15.8 tail· Displace with 285 bbls of 9.6 ppg kcl - bump plug t01000 psi over final displacement pressure, Floats held, full returns thu out job Printed: 212612003 11 :09:44 AM 0__4/17 /2.003~4~~_FA~.,~7 56~,,~264 ) _ID'_EXPLORATION ) I4J010 Legal Wen Name: MPS-30 Common ;Well Name: MPS-30 Event Name: DRILL +COMPlETE Report #: Start: 2 2/1/2003 Spud Date:, 2/2/2003 Report Date: 2/8/2003 End: 2/13/2003 ~J?;~::[i~'~)Jf~¡~J~~!~~?tt!t;!1¡:~{K~'"';i:::~~li~I!JIt);;;t!~.¡~~;~~{~~lf~~~ft~Ê!¡~I:ri\~¡~11~~~~~I~~~~~f:¡ Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 7,458.0 (ft) sa TMD: (ft) TMD Set: Top Set: (ft) Date Set: ,2/8/2003 sa Date: Date Set: BTM set: (ft) Csg Type: PRODUCTION CASIN sa Type: Csg Type: Plug Date: Csg Size: 7.000 (in) sa TMD: Plug Type: sa Date: Drilled Out: Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: HALLIBURTON >J(t:;ir;?j;;'i.;¡!:ÄP/~);;;:~ij~~::':~:,;i,;::(i:':!;:!:,/;,~:;:;':,:/}:i'X}!i;~·:fIi¡ii~~I~~;W:{ff;::!td;~if~:1'::ii;f~~;~;J~{~~~~~;:Wf';t:;:,9i:g:!K¡,:]iii:;~;';\~;~ Rot Time Start: : RecTime Start:19:00 Time End: Time End: 23:45 Init Torque: (ft-Ibf) Stroke length: 20.0 (ft) RPM: SPM: Avg Torque: (ft-Ibf) Drag Up: 250 (Ib) Max Torque: (ft-Ibf) Drag Down: 75 (Ib) ~[^:;;:;;i}rryl;!\:¡i;:i:j~?;;i:i~l;;:,":;;~;;:~i:;?~L;;:;,;,~:~;,¡;;:;;~:!,:D~~~{g;~;;i~~~j i~~~~1!.~¡Ý~:;i~~k,~!~ti&;!f~¡!;~~1f,![~)¡~jf¡[~;1fj;1f!f:~\;:,i¡j~;i1t)f~¡!!;~ Type: PRIMARY CEMENT Volume Excess %: 40.00 Meas. From: EST. GAUGE HOLE Time Circ Prior To Cementing: 2.00 Mud Circ Rate: 294 (gpm) Mud Circ Press: 600 (psi) Start Mix Cmt: 22:10 Start Slurry Displ: 22:00 Start Dlspl: 23:00 End Pumping: 23:50 End Pump Date: 2/6/2003 Top Plug: Y . Bottom Plug: Y Disp Avg Rate: Disp Max Rate: Bump Plug: Press Prior: Press Bumped: Press Held: Float Held: 6,00 (bbllmin) 7.00 (bbl/mln) y (ft) 1,500 (psi) 5 (min) Y Returns: FULL Total Mud Lost: (bbl) Cmt Vol to Surf: (bbl) Ann Flow After: N Mixing Method: ON-THE-FL Y Density Mess By: DENSOMETER ~;b!D~!:~;>~~:!&;ji}:~~~f¡~~:,i\r;:;!!::;!~?:,iÇ::::\::;:'}.~;~'~~Y!i<n;~{!'~~'i!~~fi~J~:¡:~!,if¡~;q;:f~;~"(:;~(~:ffriti¡i~~~[i~{f!);Y'i:~¡i!';;~~~~0~:~~:(~i!;~::~ Type: LSND Density: 9.30 (ppg) Vise: 50 (s/qt) Bottom Hole Circulating Temperature:60 (OF) Displacement Fluid Type:BRINE PVIYP: 13 (cp)/8 (lb/100ft2) Gels 10 see: 3 (lb/100ftz) Gels 10 min: 12 (lb/100ft2) Bottom Hole Static Temperature: 80 (OF) Density: 9.70 (PP9) Volume: 285.00 (bbl) . ~:< ,j: J;':~\. II~:;I· I:~t,r,' ~,;,::" 'I~;k ~:"~.:.r I~':~ } ~;)~.~...; 1 d : ,';11; ,': :' Û ·~:~I": jl, i I .;~·.1~,:i.... .,~:~i:;;;¡r.~: .,::~.r:1 1~!!'~I.t;;~;~,I;~r~~~¡iJ~1~~.~!~~;~:.'~~ }nlt.t~l:r:~:: :.... ,~ ,:":;~ .::~',~~~'::~ i', ~:.i~.'j.;[¡:;I:':,1':1 '!'~~:~: .; }:~\) ~'~,' ,~t.l rr :"I·:P:';~~: :..~.!'i~~'," ~ I;'~ {! " ,', ',' ~ !', ,;' :"! ,...·.'¡I~:i'~"I1!·':·' 'I'- ~r", ". " ':1.. I,;" ~: I' ': ' ,~;~,;~ >¡ ,.," ,: :' "':, 'ii!,;;,~~~"lt, t:.ìf(iiirl~tl~..~~~r~~~,:I:ß¡f~,,\("j' .' ' I.I!.,.,':,'I,.: "!.4 ""c' ,',I, "1 ~ß~¡i"'"-. i~' :;¡ " i'·' .;:::,' ,, ,~".I~ ï ' I'¿¡" ~'::~1i': ~:' :'~::',,:;:::'/;":~,'. ; ~ ::','~!:i!!:;\:'~;:::":,t::;;,::?<;;~~~ ":::;, ;,:, ;,',; ~ :,' '., '.! :" ~~ : :'I;~,':: :"';', ;::~ ;~: ,~,:.' :\"·::f:~~~JI".';;[!'Jil:l~~b: r.rj'~:~'~i~~:~!;;qrS~1;~~I~ j:; ,':':,,{; :i,1;,::\,j,~:~~~;;r,H~':::,>i:';~::i:;,~;:' I~!::;": ;'~'I~ ':';;~;i:'~',,>~I[~:!i,:~'~i~\ t\ii¡~¡:.~ ~; 't:'J';, Slurry Data Fluid Type: SPACER Slurry Interval: (ft) To: (ft) Water Source: LAKE Description: SPACER WATER Cmt Vol: (sk) Density: 8.30 (ppg) Slurry Vol:20.0 (bbl) Water Vol: (bbl) Class: Yield: (ft'/sk) Other Vol: (bbl) Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Purpose: SPACER Mix Water: () Foam Job: N Temp (OF) (OF) Pressure (psi) (psi) Printed: 212612003 11 :09:44 AM 04/17/2003 14:20 FAX 907 564 4264 f ) BP EXPLORATION ') ~005 -' 'J ',--/ ¡ ~I" ,."," > " ·,1 ,:',. I' .: I ',:,.; .....<'~~~;~~tr~;~~~~~i .......... .... I ,1 I,ll.', I. ¡I"'.'I',:'I ;J , ,. 1:,.',',,\,' ,I':,',: ":.,";",',); '111·,;1:, 1.:, :. :;;: ,'.:,:,," Legal '4Iell Na l1e: MPS-33 Spud Date: 10/26/2002 Commîn Well Name: MPS-33 Report #: 2 Report Date: 10/31/2002 Even~ame: DRILL+CÖMPLETE Start: 10/24/2002 End: .=-.. ·l.~pr:~å~;: ··.···..i;i·· .....:':.:.·.··l~.t~::£:t.+~ß~i~~i;~:t:fe~:~... ...... ·.·.·.··.···'··¿i· ... ··.·~;Ug····.· ... ... ....._ Hole Sizþ: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 5,275.0 (ft) sa TMD: (ft) TMD Set: Top Set: (ft) Date Set: 11/1/2002 sa Date: Date Set: BTM set: (ft) I Csg Typ¡e: PR01DUCTION CAS IN SO Type: Csg Type: Plug Date: Csg Siz¢: 7.000 (in) SO TMD: Plug Type: i sa Date: Drilled Out: ?mtd, ?¡sg: OPEN HOLE _~td. Csg:_.~.__Gmtd. Csg:______. Gmtd. Csg: _.___ CementICo:~~UBUR!ON" ._ , .", "'__~_ "", .~. mlj{"j":' ......,........ ... ·..····i ... i.__:ziip,~~'o4imèt<.. . ...' .... .,............ ...........~...~............~~. Rot TimfStart:: Time End:: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-lbf) Max Torque: (ft-Ibf) RecTirrye Start:04:00 Time End: 07:00 SPM: 1 Stroke Length: 20.0 (ft) Drag Up: 145 (lbs) Drag Down: 115 (lbs) :~ . .'. 'f' ..' ... :;",,__ ,,:\. .. ,[-·.,"i",,':'::.[:};~~'~;~~:·~i~!+!."·:,,·.~· ...,-¿ ... . ... . ~ --'- .___._ ,. . , ' ,;:. '{.~::!/ ,i ~~ " , Type: PRII\tARY CEMENT Start Mix Gmt: 06:00 Disp Avg Rate: 5.00 (bbl/min) Volume Excess %: 40.00 Start Slurry Displ: 06:00 Disp Max Rate: 5.50 (bbl/min) Meas. ~rom: EST. GAUGE HOLE Start Displ: 06:15 Bump Plug: Y Time Circ Prior End Pumping: 07:00 Press Prior: (ft) To Cementing: 2.00 End Pump Date: 11/1/2002 Press Bumped: 1,500 (psi) Ann Flow After: N Mud CifC Rate: 210 (gpm) Top Plug: Y Press Held: 5 (min) Mixing Method: ON-THE-FLY Mud Circ Press: 400 (psi) Bottom Plug: Y Float Held: Y Density Meas By: DENSOMETER ~..·····i~~ .... ....~.. . .~i.~UdD~~,;"·..···.·:!ii,:ii;i.':,·'-·.'·;"· Type: 4SND De1sity: 9.30 (ppg) Vise: 43 (s/qt) PV/YP: 13 (cp)/8 (lb/100ft2) Gels 10 see: 3 (lb/1 00ft2) Gels 10 min: 12 (lb/100ft2) Bottom Hole Circulating Temperature:60 (OF) Bottom Hole Static Temperature: 80 (OF) Displacement F uid Type:BRINE Density: 10.00 (ppg) Volume: 238.00 (bbl) """""---:'~:¡~;'; i ';J: :~, ,1;)\ ,/^::', ;;/1, ""'I'I'·.i~:· ¡:' Ji '"i' I:~S¡-:!" I,i Ii .¡i'li'·'" . \,: ~"_'\ i' 1.'\': li."!·I: I~ \',' :::,~:::: "'I~r.ll! -:<:;i.",:·('?i:: :;,i" '." . I,' 'St~ge:;~¡'o,-:':1:r $lu~¡'Y,':No: ---:-....~I "', ""';~I:·. : ::;:'( ~)I\.::..,:,.,: " .,ii>:~....:..-:~._, Returns: FULL Total Mud Lost: Cmt Vol to Surf: (bbl) (bbl) .-- '",:~ '," ::::'};::(,::;::::1 -._-----..'." _~'.. ~..,d Slurry Data Fluid T~pe: SPACER Slurry ¡nterval: (ft) I Water Source:..AKE Test Dlta ThiCkefing Time: Free vyater: (%) Fluid Lbss: (cc) Fluid ~oss Pressure: (OF) _.-- --r-- I ¡ I I I I I To: (ft) Description: SPACER WATER Cmt Vol: (sk) Density: 8.30 (ppg) Slurry Vo120.0 (bbl) Water Vol: (bbl) Class: Yield: (ft3/sk) Other Vol: (bbl) Purpose: SPACER Mix Water: 0 Foam Job: N Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) --'---- -'---' Printed: 11/112002 11:27:41 AM '04/17/2003 14:22 FAX 907 564 4264 _·_·-L·___I__~·_·_·__·_ r·-··- i .,; .......-/ ~~!.PLORATION ·"-.i ) I4J 006 .i.:.,.,.;,.;;¡;,H.~~¡,~;:~~'~ ¡..·:~~Ä~~'I;.~~~~åi ;:',:::,I:¡ ,'>'.::,\~':,'.~,"./' ::'.:,':>:;> I :,:~;.':. ,' ,'I,::,\::,:~~"'::":;"';"'(I>': ';""': Legal 'o/ell Name: MPS-33 Spud Date: 10/26/2002 Comm<l>n Well Name: MPS~33 Report #: 2 Report Date: 10/31/2002 Event ~ame: DRILL+COMPLETE Start: 10/24/2002 End: ~~"""I, '·"'I,·.P",·;,i'::~,·",:"':~,:,,),:,·',:,.;'~"'"",'I"',:,::,:,: I ¡d ,1'11,1<:1 r . rl 1,.:,:.:;:.;,,',,':·.,<"·::.,'::,.,'.,' ,:, ,','","">.:1' . "::' ;, :,:'::. "'1.1';.'" ,," L4§~"~ ~,h~~ta~~fitQ~ 1.~lu~o/. !IIp:':B ~f~..c.....:~c. 2~S Slurry qata Fluid Ty~e: SPACER Description: SPACER WEIGHTED Class: SPACER Purpose: SPACER Slurry Interval: (ft) To: (ft) Cmt Vol: (sk) Density: 10.00 (ppg) Yield: (ft3/sk) Mix Water: () Water sþurce: LAKE Slurry Vol:50.0 (bbl) Water Vol: 37.00 (bbl) Other Vol: (bbl) Foam Job: N ! Test Data I Thickeníng Time: Temperature: (OF) I Free W,ter: (%) Temperature: eF) Fluid L0!=is: (cc) Temperature: (OF) Fluid LOþs Pressure: CF) ~)';¡:!n::2:~·'· ·,,~,·..:<,i·~t~g;¡~~;:;i~,~i~1~¿;,'~i~~4!, . ....... ,..... ". . ..~.. . Slurry 9ata Fluid T~pe: CEMENT Slurry I~terval: 4,300.0 (ft) To: I Water Source: LAKE Time Compressive Strength 1: Compressive Strength 2: Temp (OF) CF) ,....-------,.._'-"-_.._-_........".".................". .._'''".....,......,..,..' '"..."..."-""'....".,,,,,,,.._,,. . '. " '.. ~escriPtion: LEAD SLURRY Class: E-CLASS''''- J 5,140. (ft) Cmt Vol: 50 (sk) Density: 12.00 (ppg) Yield: 2.170 (ft3/~ ~,~rry VO':19:~~~.~~?__..".~~.~,.~~·a...60 (bbl) uther Vol: (bbl) Temperature: (OF) Temperature: eF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: ,~~~>',,:.;::',í!"'.~ ";:,,,.',"" i, ,~~ ,'St~g':NO,~,:1:,;ß''7I'rry::Nø::.:,4,:of,,4. ,",. ' ,., .'I'··I'''".I,~~..;.'II:.·.'.I..,'..I,I. Temp (OF) (OF) ... . ~" "" -, - ~ . -~. ~.........-.,.._-- Description: TAILßLURRY'" Cla·šš:-··G-:~LASS ì 5,275.0 (ft) Cmt Vol: J00'(sk) Density: 15.80 (ppg) Yield: 1.150 (ft3/sk) Slurry \.féÎ:32.0 (bbl) Water Vol: 19.00 (bbl.L..9th~LVol.;·(bbl)''' ,... ---..,.... ",........."~...,,. Temperature: 80 ("F) Temperature: 80 (OF) Temperature: 80 (OF) Time Compressive Strength 1: Compressive Strength 2: ""'. ,Stage No: 1 Slurry, No: 4 of 4 - Additives "-- --- ---Iype DISPERSANT FLUID LOSS _ Concentration ~~~- Temp (OF) ("F) liquid _9onc. 0.20% 0.35% ::1 .lJ Pressure (psi) (psi) I ,"-:---;-:-:-;--_.,'-,- Test D,ta Thicke~ing Time: 6.00 Free W~ter: (%) Fluid Lclss: (co) Fluid _~5S Pressu~:: (OF) TIlliDI";i,'1,'!,!,¡i¡';";':i:'.' .... .'.r ¡':i. ,ii':''':,;;,'', .ii.' Slurry r.ata Fluid T~pe: CEMENT Slurry I terval: 5,140.0 (ft) To: Water . ource: LAKE Test D1ta Thicke;ing Time: 4.35 Fre¡vv,ater: (%) Fluid L 55: 85.0 (cc) ~i~L,S~;r~j~;7;·i~O('~). '. [:",';12:' '.,:,' ;~'~ad~"Ñ~nié.'·< CFR-3 HALAD 344 ~i- I I I , r::' , ' ~'_~~I Purpose: FILLER SLUR Mix Water: 11.63 () Foam Job: N Pressure (psi) (psi) ., , " :1,'" I~ ".. I Purpose: PRODUCTIO Mix Water: 5.00 () Foam Job: N Pressure (psi) (psi) -- ----- Units __I -'- Printed: 11/112002 11:27:41 AM '04/17/2003 14:23 FAX 907 5611 4264 ------1-------- --q- r--~ I BP EXPLORATION ) I4J 007 \.J '--/ ·i,;'... ..!.:'~~~::.;'(?;,i, ....<;... . ,',',~:'(f;,ém:,etitIÎiÏil;h~,:iRij!':;Ø'F:t': , : "~:;:;' I:,,::,',' ','u':"':-!,,:;~:':', ':':'r!i,:'~\':" : , . ' , Legal Well Name: MPS-33 Spud Date: 10/26/2002 Comm~n Well Name: MPS-33 Report#: 2 Report Date: 10/31/2002 Event fiJame: DRILL +COMPLETE Start: 10/24/2002 End: ~.:2d.é~~iii~TJ~Z>'·'" ..·.·.·.·...·,..·....j£s~~~,t;~·....·.,i\'i·.··.·....:S]:',.:.,:....'.:.'. ··'·.·..··.,'·.·.~~cit:+9~i~~~···.~__ ······.··..·.:.··l Test Pre~s: (psi) Pressure: (ppge) Liner lap: For: ! (min) Tool: Pos Test: (ppge) Tool: Cement Þ-ound between Open Hole: (ft) Neg Test: (ppge) Tool: I Shoe an~ Collar: Hrs Before Test: Hrs Before Test: L Cement Found on Tool: þ)':i'....·..¡~.~~~ÏJrVë}'E~~¡~~h~~..·.·.}·....···...·..·..·.._!.';·i·"i).;,0·J~~~~fli~~SÙ~~~~'· .............:.'... .....'..:..... ~. ~..·'l eBl Run: Cement Top: (ft) Under p!ressure: (psi) How Determined: Bond Qiliality: TOC Sufficient: Get Run!: Job Rating: Bond Q~ality: If Unsuccessful Detection Indicator: Temp Survey: Remedial Cementing Required: Hrs pridr to Log: Number of Remedial Squeezes: ~i~~~:-~ " ;',".11":'1:" I,Y",I,.""". '" .' ',Ii''', '" ','" ""',,' . ,I", ' , 'Rem~r,ßs" " ,,' ~4~"<' ' ':i"" ",:,,',':.:' , ,::~'~'~;::¿;.d2X~¿'~~:~,~·l~' Fun Returns, 19 bbls of 12 ppg lead slurry tail 32 bbls of 15.8 tail· Displace with 69 bbls of warm 6.8 ppg diesel +130 bbls of 10 ppg kcl - bump þlUg t01000 psi over final displacement pressure, Floats held - Centralizer from 5100 - 4300' Printed: 11/112002 11:27:41 AM NOT VALlp..~f.!.~!3J~~..~X~·........., K:'; ;...;;;..:......: ....:.: .... .:·~Ù '; :'\:. ::~..:. :':" ". .:>.:. :::"(P=' ::" ···:S"::,'·;·::: ::;.::/:.\':":-'. ......;.:::.~~ .... ......'\0"... ...... .....' ..., :'.:. ::N~P ,....:..:. ::'., ::'.' ~'.' ':".: . ~):\.::;;.}:::~. .:1::::¡:{\):;;:~:{::¡~}~Ù:{B . . *******$100.00******* AMOUNT CONSOLIDATED COMMERCIAL ACCOUNT 56-389 412 No. P 055039 H NET VENDOR DISCOUNT CHECK NO, 055039 DATE 3/12/2003 1110550 :3 ~III .:0 L. ¡. 20:38 ~ 51: 0 ¡. 2 78 ~ bill DATE March 12,2003 u~.; ..,.......... ,.m:r(~~ltt.(:) j::J1 - ,:Ati¡t.. ·,:~m' IIW'.·,,,..,, ....,~. no" NATIONAL CITY BANK Ashland. Ohio PERMIT TO DRILL GROSS ___-_-.- -_.u, _ __ h_ _....._ _ _..u.-._ _. _ __.__ _. ALASKA QIL &.PGÆS C()NSEIR\{:A\.TIONCQMMISSION 333 W 7TH A\tENkJE SUITE 100 .. P... .p _ ANCHORAGE,AK 9$501-3539 8. TO THE ORDER OF: PAY: BP EXPLORATION, (ALASKA) INC. PRUDHOE BAY UNIT PO BOX 196612 ANCHORAGE, AK99519-6612 TOTAL ~ THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. -hl R:~ - L(p i -- DESCRIPTION INVOICE I CREDIT MEMO 3/12/2003 INV# CK030603L ,/ DATE P 055039 ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMtTT AL LETTER WELL NAME ø¡:? ~-2¿'¿ PTD# 203-00 I cµ~\,-\t ~(t \\ CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) paOT (PH) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to, be reported as a function' of the original API number stated above. HOLE In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/1 0/02 C\jody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sam pIe intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WElL'·.PERM IT.CHECKlISr· Company _~e...EXP.LQH8I!QJ~ -<AL8SJ~8>-I~Ç.._.____.___.__.__.___ Well Name: MILNEJ:~ºJKT_UHLT_S.B__S-=-2_6L_,__._._.__ PTD#: 203061 0 Field & Pool Ml1.~.E POINT. SCHRAQI;..R BI"FF Q~_525140 Initial Class/Type -.S.~R /1WINJ GeoArea .890 Administration 11 P~rmit.fee attact)e_d. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . 12 .Leas~.number .appropriat~. . .. ....... . . . . ,. . . Y~s . . . . . . . . . . 13 .u.ni.que well.n.alll~.al1d ou.mber . . . . . Y~s ....... 14 .Well JQC9t~d i.n.a. d.efjne.d .ppol. . . . . _ . . . . . . . . . . . . . . . . _ . . . . . Yes. . . . . . . . . . . . . . 5 .Well JQcat~d prpper .di.stal1ce. from driJling unit.b.oundø'Y. . . . . . . . . . _ Y~s . . . . . . . . 6 Well JQcat~d pr.oper .di.stance. f(om. other wells. . . . . . _ . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .................. 7 .S.ufficient .acreage.ayaili3ble in.drilJiog unit. . . . . . . . . . . . . . . . . . _ Y~s . . . .. . Each .d(imng.uni.t i.s.a.quarter-quart~r-qu.arter_gpvernmentaJ sectiQn. . . . . . . . . . . _ . . . . . 8 Jf.d~viated. .is. weJlbQre plaUncluped . . . . . . . . . . _ . . . .. . . . _ . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . 9 .Qpe~ator only affected party. . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . _ . . _ . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 .Qpe~ator bas.apprppriate.b.ond inJorce. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . _ . 11 Permit. call be i.ssu.ep withQut conserva.tion order. . . . . . . . . . . . . . . . . . . . . . Y~s . . . . . . . . . . . . . . .. .................................................... Appr Date 12 p~(fTJit. can be i.ssu.ep withQut admil1ist(ati\(e.apprpvaJ . . . . . . . . . . . . . . . . . ... . . . . Y~s . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . _ . _ . . . . . . . . . . . SFD 4/15/2003 13 .C.ao pennitÞe i3PPJQved before .15-pay. wajt. . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . Yes. . . . . . . . . . . . . . . . . . - . . _ . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 .WeIlJQcat~d wtthin area and.strata øuthori.zed byJojectipo Ord~r # (PuUO# in.cpmm~ots).(For. Y~s . . _ . . . . AIO. tOB. . . . . . . . . _ . . . . . . . . . . . . . _ . . _ . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . 15 .AJI wells. within .1 (4. llJite.are.a.ofreyiew id~otified (Fp( serv.i~ welJ 9111YL . . . . . . . . . _ . . . . Y~s . . . . . . . Affe.cted wells.are. MI?U $:17. 1.7.L 1 ,.2Pi. 24, ~Oi. anp .33L . . . . . . . _ . . . . . . . _ . . . . _ . . . . . . . . . . 16 Pre-prpdu.cedil1jector; duri3tiQn.ofpre-productipl)l~$s.tt1é::¡n.3montt)s.(For_ser:vi.ceweRQnJy). _ NA..... _.. _.. _.. _ ,....... _.......... _. _....................................... 17 ACMP. F.inding _of Con.si.stel1cy.h.as bee.n jssuedJpr.tbis prpject. _ _ _ . _ . . _ . . _ . _ _ _ . . _ . NA _ . _ . _ . _ . . . . . . . _ . _ . . . . . . . . . . . . _ . . . . _ _ . _ . . . . . . . . . . . . . . . . . . . . . . . . _ . . . 18 .C.oodu.ctor string_prQvided . . . . . . . . . . . . . . . _ . . . . . . . _ . . _ _ . _ _ _ . _ _ . _ _ . . . Yes _ . . _ . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . _ . _ . _ . . _ . . . . . . . . . . . . . . . . . . . . . _ . _ . . . _ . . . . . . 19 .S.lJr:fac~.casing_prQte~tsall_known.USOWs... _........ _....... _. _.. _. _ _.. NA...... _AII.USOWsex.empt.edbyEPA..40.cfR.1~7..1Q2_(b).(3)............... _. _ _ _ _. _ _............ 20 .CMT.v.otadequ_ate.to circ.IJtate.ol1.cpnd.IJctpr.& surf.q)g . . . . _ _ _ . _ . _ . . . . . . _ _ . _ . . _ Yes _ . . _ . _ . . . . _ . . . _ _ . . . . . . . . . . . . . . . . . . . . . . _ _ . . . . . . . . . . . . . . . . . _ _ _ _ . _ . . . . _ _ . . . . . . 21 .CMT. v.ot adequ.ate.to tie-i.nJQng .stri[1g to_s!Jrf çsg_ . . _ _ _ _ _ . . . . . . . . . . . _ _ . _ _ _ _ . . No. . _ _ . . . . . . . . . . . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . _ . . _ _ _ _ _ . . _ . _ . _ _ 22 .CMT.wiH Goyer_aU !<oown.pro.duGtiye bQri;ZQn.s. . . . . _ .. .... _ . . . _ . _ . . _ . _ _ _ . _ . Yes. _ . . . . . _ _ . _ _ . . . . . . . . . . . . . . . . . . _ . . . .. . . . . .. . . . . . . . . . . . . . _ _ _ . . . . . .' . . . . . . . . _ . _ 23 .C_asiog de.signs ad.equate fp( C..T~ 13 .&. permafrpst. . . _ . . _ . _ . . _ . . . . . . . . . . . . _ . _ Yes. . . _ _ . . _ . _ . . . . . . . . . . . . _ . . .. . . . . . . . . _ . _ _ _ . _ . . . . . . . . . _ . _ . . . _ . _ . . . . 24 Adequøt.eJan.kage.or re.serye pit. . . . . . _ . . _ _ _ . _ _ _ . . _ _ . . . . . . . . . . . . . . . . . .Yes . _ . . . . . Rig is.e.quippe.dwitb steel.pits.. No. rese.r\(e.p.it.pl.anoe.d. All waste to.G&.I.. . . . . ,. . _ _ _ . . . . . . . . . . . . . . . 25 Jf.a.re-prill.. bas.a. 1.0.:-4.03 for i3banponment b.eeo approved. . . . . . . . . . . . . . . . . . . . . . NA . . . . . . . . . _ . . . . . . _ . . . . . _ _ . _ . _ . _ _ _ _ _ . . . . . . _ . . . . _ . _ . _ . _ . . . . . . _ . . _ _ _ .., ... _ . . . . 26 .Adequatewellb.ore. separation .Proposep. . . . . . . . _ _ . _ . _ _ . _ _ . _ . _ . . . . _ _ _ _ . .. . Yes _ _ _ _ _ . . ~Q clos.e.approach Js.sues.ide.ntifiep w.itb existing well$._ . . . . . . . . . . . . . _ _ _ _ . . . . ., . . . . . . . . . _ _ . 27 Jf.dive(terJeq.IJire.d. dQes .it meet. reguJa.tipns. . . . . . . . .. . . . _ _ . _ _ _ _ . . _ _ _ _ _ _ . _ _ _ .Yes _ _ _ _ _ . _ . . . . _ . _ _ . . . . . _ . . . . . . . . . . . . . . . _ _ _ _ . . . . . . . . _ . . _ _ . _ . _ . . . . . . _ . _. . . . . _ _ . . 28 .D.rilliOgfJujd.prQgram $~hemati.c.& aq.uipJist.apequi3te. . _ . _ _ _ _ _ . _ . _ . . .. _ . . . . . . . .Yes. _ . . . . . I:Qrmati.on pressura es.ti01ated at8..35.EMW.. Pløonep JT!.uP w~igbt.9..1. -.9..2.. _ _ . _ _ . .,. .. . . . _ _ _ 29 .BOPEs,.dp .they JTI.eøt reguJa.tion . . . . . . . . . . . . . . . . . . . . _ _ _ . . _ _ _ . . _ _ _ _ . . . Yes. . _ _ . . . _ . _ . . . . . . _ _ . . . _ . . . . . . . . _ . . . . _ _ _ . . . . . . ,. . . . _ . _ . . . . . . . _ . . . _ _ . . . _ . 30 .BOPE.pre.ss ra.tiog appropriate; .testto .(pu.t p~ig in .comments). . . . . _ . _ . . . _ _ . . . . _ . _ .Yes _ . _ _ _ _ _ MAS!? est @ 134.1 psi.. ep .normally- tests to.3ßOQ psj.. . . . . . . . . .. . _ . . _ . . . . . . . . . _ . . . . . . . . . . . 31 ..c.hpke.llJanifold CQmpJies. w/AI?I.R~-53 (May 84). . . . . . . . . _ _ . _ _ . . _ . _ _ . . _ _ _ _ _ _ .Yes. _ . . _ _ . _ _ _ _ . _ . . .. . . . . . . . . . . . . . . . . . . . . _ _ _ . . . _ . . . . _ . _ _ . . _ . . . . . . . _ _ _ _ 32 .WQrk will pCC.IJr withput.operation .sbutdown. .' . . . _ _ _ _ . _ .. .. . _ _ . . . . _ . . . . . . . . .Yes. _ . . . . _ . . _ _ . . _ _ . ., . .. . . . . . . . . . . . . . ., . _ . .. _ _ . _ _ . . . . . . . . . . . . . . . . . _ . . . 33 .Is presence. Qf H2$ gas. prQb.ablø. . . . . . _ . . . . . . . . . _ . _ . _ _ . _ . _ . . . . _ . _ . . . . No. . . _ _ _ . . _ _ . . . _ _ . _ . _ . . ., . . . . . . . . . ,. . . . . . _ . _ _ . . . . . . . . . . . _ _ . . . . . . _ . '. _ ,. . . . 34 Meçt)a.ni.cal.cpodjtionpt we.lIs wi.thin AOR yerified. (for.s_ervice welJ onJy). . ., . . . . . . . . . . . .Yes. . _ . . . . $8 .interval came.nt jobs. axamtned tor all.except $-24 wbich. is stJII.d.rilJiog. . No.iotegrity. prob. Î.dølJti.fiect.., . . . . . . ---.---- ,.----- 35 Permit c.ao Þe i.ssu.ed w/o t)yp~ogen_ s.utfide OleaS!Jres _ _ ., _ _ . . _ . . .. . . . . . . .Yes. . . _ _ . . . _ _ . . . _ _ ., _ . _ . ., . . . . ,. . . . . . . . . . . _ _ . . . . _ . . . _ . . . _ . _ . . . . . . . _ . . _ _ . ,. . . . . . . . . 36 _D.ata.praselJted Qn. pote.ntial pverpres.sure .;zone$. . . . . . . _ _ _ _ . . . . . . . . _ _ . . _ . . _ . .Yes _ . _ . . . _ Res~(Voir pre~s.ure.expe.ctep.tQ b.e. &.35. ppg _EMW.. Re.seI'Yoi( wilJ ba drjJlect with. 9.. 1.-9.2 ppg. mud.. ,. . . _ . ,. . . _ . Date 37 .Sei.smic.analysJs. Qf shallow gas.zpoas. _ . . _ . . . . . _ _ _ _ . . _ _ . . . . . .. . . . . . . . . . . NA . . . . . . . CoaJ se.arn.s .are_ c.omm.o[l .in. tba area. . Sh.aUQIJ\/. gas haz,ard. add~essep .in. Drilli.ng Hi3;zaJcts.npti~e, 4/15/2003 38 .Seç¡b.ed .cpndjtipo survey.(if off-shpre) . . . . . . . . . _ . . . _ _ _ _ _ . . . _ . . _ . . . . NA _ . . . . . _ . _ _ . . _ ., . . . . . . . . . . . . . . . . . . . . _ _ _ _ . . . . . . . . . . . . _ . . . . '. . . . _ . .. . . . . 39 . CQntact narne(phone.for.weekly progress. reports [exploratpry _only). . . _ _ . . . . . _ . . _ _ . . NA _ ., _ . ., . _ _ . _ . . . . .. . . . . . . . . . _ . . _ _ _ . . . . . . . . . . . . _ . . . . . ,. _ _ . . . . . . . . . Engineering Appr Date TEM 4/18/2003 f!J,.~ '-\( \.c;,--ð"7 Geology Appr SFD Geologic Commissioner: Program .S.E.8.___,._ Unit J.1328 On/Off Shore .on [] D Well bore seg Annular Disposal - - - - - - - - " - - " - - - - - - - . - - - - - . - - - . - - - - - - .. - - - - . - - . - - - - - - - - - - - . - . - - - - - - - - - - - - - - - - ( ( - - - - - - - - - Date: Engineering Commissioner: Date Public Commissioner {õ Date ý/ /y/ ) ) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Pennilling Process but is part of the history file. To improve the 'readability of the Well History file and to sinl,plify finding infomlation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ), , Sperry-Sun Drl~~lng Servlces LIS Scan Utility ) $Revision: 3 $ LisLib $Revision: 4 $ Wed May 28 13:42:51 2003 ;}..03 - C) i£., I C""~ ,,-) \ -:iF, \~5~ Reel Header Service name.... . . . . . . . . .LISTPE Date.................... .03/05/28 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .03/05/28 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-26 500292315000 BP Exploration Sperry-Sun Drilling Services 28-MAY-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002435668 T. MCGUIRE C. DIXON MWD RUN 2 MW0002435668 T. MCGUIRE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3281 296 MSL 0) .00 73.20 38.40 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 20.000 112.0 8.500 9.625 2931.0 # K~~\Y\~ REMARKS: ') ) 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) , UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. MWD DATA ARE CONSIDERED PDC PER E-MAIL FROM DEWAYNE SCHNORR, BP EXPLORATION (ALASKA), DATED 5/27/03. 6. MWD RUNS 1 AND 2 REPRESENT WELL MPS-26 WITH API#: 50-029-23150-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 5944'MD/4280'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP RESISTIVITY) . SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS $ File Header Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record..65535 F i 1 e Type..... . . . . . . . . . . . LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPD RPM RPS RPX FET $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 69.0 112.5 2925.5 2925.5 2925.5 2925.5 2925.5 STOP DEPTH 5906.5 5944.0 5898.5 5898.5 5898.5 5898.5 5898.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) - - - - - - - -'- ) EQUIVALENT UNSHIFTED DEPTH --- ) BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ BIT RUN NO 1 2 MERGE TOP 69.0 2941.0 MERGE BASE 2941.0 5944.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . .Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69 5944 3006.5 11751 69 5944 ROP MWD FT/H 1.96 1765.04 290.792 11664 112.5 5944 GR MWD API 6.3 134.42 70.0951 11676 69 5906.5 RPX MWD OHMM 0.39 155.95 14.6828 5947 2925.5 5898.5 RPS MWD OHMM 0.31 2000 15.8025 5947 2925.5 5898.5 RPM MWD OHMM 0.27 2000 15.7975 5947 2925.5 5898.5 RPD MWD OHMM 0.25 2000 23.0364 5947 2925.5 5898.5 FET MWD HOUR 0.06 35.15 0.475478 5947 2925.5 5898.5 First Reading For Entire File......... .69 Last Reading For Entire File.......... .5944 File Trailer Service name............ .STSLIB.001 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record. .65535 File Type........... . . . . .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 ') Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record. .65535 File Type....... . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 ) header data for each bit run in separate files. 1 .5000 START DEPTH 69.0 112.5 STOP DEPTH 2897.0 2941.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAX I MUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # 15-MAY-03 Insite 66.37 Memory 2941.0 112.0 2941.0 .6 54.4 TOOL NUMBER 142827 12.250 112.0 Water Based 8.90 185.0 9.3 700 12.8 .000 64.400 .000 .000 .0 71.6 .0 .0 · f·, ) d Data Format Specl lcatlon Ré~or Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . .Down optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) Name Service Order DEPT Rap MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69 2941 1505 5745 69 2941 Rap MWD010 FT/H 1.96 1386.03 231.628 5658 112.5 2941 GR MWD010 API 20.58 124.33 67.438 5657 69 2897 First Reading For Entire File........ ..69 Last Reading For Entire File.......... .2941 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record. .65535 File Type............... .LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record. .65535 File Type....... . . . . . . . . . La Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET 3 header data for each bit run in separate files. 2 .5000 START DEPTH 2897.5 2925.5 2925.5 2925.5 2925.5 2925.5 STOP DEPTH 5906.5 5898.5 5898.5 5898.5 5898.5 5898.5 ROP $ ) J 5944.0 2941.!J # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . .Down Optical log depth units... ....... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 18-MAY-03 Insite 66.37 Memory 5944.0 2941.0 5944.0 53.3 55.5 TOOL NUMBER 132477 102982 8.500 2931.0 Water Based 9.30 53.0 8.8 700 5.4 7.000 5.140 4.500 4.500 68.0 95.0 68.0 68.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 \ ) RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2897.5 5944 4420.75 6094 2897.5 5944 ROP MWD020 FT/H 16.56 1765.04 346.528 6006 2941.5 5944 GR MWD020 API 6.3 134.42 72.5924 6019 2897.5 5906.5 RPX MWD020 OHMM 0.39 155.95 14.6828 5947 2925.5 5898.5 RPS MWD020 OHMM 0.31 2000 15.8025 5947 2925.5 5898.5 RPM MWD020 OHMM 0.27 2000 15.7975 5947 2925.5 5898.5 RPD MWD020 OHMM 0.25 2000 23.0364 5947 2925.5 5898.5 FET MWD020 HOUR 0.06 35.15 0.475478 5947 2925.5 5898.5 First Reading For Entire File......... .2897.5 Last Reading For Entire File.......... .5944 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/05/28 Maximum Physical Record. .65535 File Type....... . . . . . . . . . LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . .. . . . . . . . . . . . . . . .03/05/28 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . " . . . . . . . . . . . . . . .03/05/28 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.. . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File