Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-077 RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 12 2015 WELL COMPLETION OR RECOMPLETION REPORT AND LOGor,n , 1a. Well Status: El Oil ❑Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended lb. Well Class ' 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic ❑GINJ 0 WINJ ❑WAG 0 WDSPL 0 Other No.of Completions Zero ' - ® Development 0 Service 2. Operator Name: 5. Date Comp., Susp.,qr Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 1/19/2015 194-077 - 314-474/314-685 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage, Alaska 99519-6612 5/22/1994 50-029-22484-00-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 6/11/1994 PBU 11-30 ' 1185' FSL, 383' FEL, Sec.28, T11N, R15E, UM - 8. KB(ft above MSL): 62.4' 15. Field/Pool(s) Top of Productive Horizon: 1899' FSL, 3816' FEL, Sec. 21,T11N, R15E, UM GL(ft above MSL): 27.2' Prudhoe Bay/Prudhoe Bay . Total Depth: 9. Plug Back Depth(MD+TVD) 3083' FSL, 312' FEL, Sec. 20, T11N, R15E, UM 11508' . 8379' 4b. Location of Well(State Base Plane Coordinates, NAD. 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 707135 • y- 5952899' Zone- ASP4 13719' • 8759' - ADL 028325, 028322&028321 TPI: x- 703525 y- 7958797 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 701715 Y- 5959932 Zone- ASP4 None 18. Directional Surve Y: ❑Yes ® No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: DEN/NEU/RES N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED See Attached 24. Open to production or injection? 0 Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Size Perforatione and Number): 746 4-1/2", 12.6#, 13Cr85; 11030' 10471'/7814' - 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. / ` / 19115 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No --,-..7 ,11'" .. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED . MAa 1 2 2015 sows) 11615' Set Posiset Plug P M�"�_ 11596' -20'Cement 11508' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each), and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None i Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Su it Original Only ✓G I/71-• //0/i 5'- '' 3%0 fid L RBDMS FEB 2 3 2015 29. GEOLC`'3IC MARKERS(List all formations a' irkers encounter 30. FORMATION TESTS NAME TVD Well Tested', , ]Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit 11446' 8346' None Zone 3 11636' 8446' Base of Sadlerochit 12747' 8783' Formation at Total Depth: 31 List of Attachment: Summary of Pre-Workover,Summary of Daily Workover Reports,Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram,Cement Report 32 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Zach Browning,564-4220 Email: Zachary.Browning@bp.Com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Phone 5644091 Date: 2112116 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26 (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only • WELL NAME: 11-30 23. Attachment-Casing, Liner and Cementing Record Casing Setting Depth MD Setting Depth ND Hole Size Wt. Per Ft. Grade Top Bottom Top Bottom Size Cementing Record 20" 91 5# H-40 36' 114' 36' 114' 30" 260 sx Arctic Set(Approx) 13-3/8" 68# NT-80 35' 3982' 35' 3723' 16" 1561 sx CS III, 375 sx Class'G' 9-5/8" 47# NT-80S 2465' 11393' 2420' 8317' 12-1/4" 775 sx Class'G' 7" 26# L-80 32' 11168' 32' 8192' Scab 825 sx Class'G' 4-1/2" 12.6# L-80/13CR80 11148' 11322' 8181' 8278' Scab Uncemented 7" 29#/26# NT-80 11232' 12825' 8228' 8785' 8-1/2" 285 sx Class'G' 4-1/2" 12.6# L-80/13CR80 12663' 13719' 8778' 8759' 6" Uncemented Slotted Liner 11 -30, Well History (Pre-Rig Workover) Date Summary 08/22/14 DRIFTED TBG W/20'x 2.70" DUMMY WHIPSTOCK DOWN TO 11,650'SLM, SAW NO RESTRICTIONS. RAN 10'x 3-3/8" DUMMY GUN DOWN TO 3,247' SLM, UNABLE TO PASS RESTRICTION. DRIFTED TBG W/12'x 3" BAILER TO 11,650'SLM (no issues). 08/24/14 T/I/O=SSV/1,760/100,Temp: SI, PPPOT-T(PASS), PPPOT-IC (PASS) Drilling Screening. PPPOT-T: Stung into test void, (250 psi) bled void to 0 psi. Functioned LDS, all moved freely.Torqued LDS to 350 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 100 psi in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (0+ psi) bled void to 0 psi. Functioned LDS, all moved freely.Torqued LDS to 350 ft/lbs. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 0 psi in 30 minute test. (PASS) Bled void to 0 psi. 09/18/14 T/I/O=2220/1860/140. Temp=SI.Tbg & IA FL. (E-line request).ALP= 1680 psi,AL SI @ casing valve. Tbg FL @ 10,024' (152 bbls). IA FL @ 4070'(Sta#4, SO(218 bbls)). SV, WV, SSV= C. MV=O. IA, OA =OTG. NOVP. 16:45 hrs. 09/19/14 T/I/O=2210/1855/163 Temp=S/I (Obj. Drilling Screening). Pumped 3 bbls Neat McOH followed by 90 bbls 1% KCI and 15 bbls Dead Crude down IA to load. 09/20/14 Pumped an additional 118 bbls Dead Crude down IA for a total of 133 bbls to load. Pumped 265 bbls 1% KCI and 38 bbls Dead Crude down TBG to load.Well S/I notified DSO upon departure.Thermal expantion tags hung on IA, Master, and Wing.AFE sign hung on Master. FWHP =523/602/248. SV/WV =C. SSV/M =O. IA/OA= OTG. 09/22/14 INITIAL T/I/O= 150/500/0. RUN#1 -RIH W/PBMS/PILS FOR CROSSFLOW AND FLUID CHECK. CONFIRM NO FLOW AND ALSO CONFIRMED WATER IN SETTING AREA FOR PLUG RUN#2- RIH W/SLB POSISET PLUG. --SET TOP OF PLUG @ 11615' IN 7" LINER(GOOD INDICATION OF SETTING). RUN#3- RIH W/1ST 30'X 2.125" DUMP BAILER FILLED W/CEMENT& DUMPED ON TOP OF PLUG @ 11615'. RUN#4-RIH W/2ND 30'X 2.125" DUMP BAILER FILLED W/ CEMENT& DUMPED ON TOP OF PLUG. CURRENTLY PULLING OUT OF THE HOLE AFTER 2ND CEMENT BAILER DUMP. 09/23/14 INITIAL T/I/O = 150/500/0 PSI. CONTINUE POOH WITH RUN 2 BAILER. RUN#5- RIH W/RUN 3RD 30'X 2.125" DUMP BAILER FILLED W/CEMENT&DUMPED ON TOP OF PLUG, POOH. RUN#6- RIH W/RUN 4TH 30'X 2.125" DUMP BAILER FILLED W/CEMENT& DUMPED ON TOP OF PLUG, POOH AND RIG DOWN. TOP OF PLUG TAGGED AT 11615', DUMPED 10'OF SLB ULTRA SHEAR CEMENT. ESTIMATED TOC = 11605'. CEMENT NEEDS 24 HRS MINIMUM CURE TIME FROM LAST DUMP TIME PRIOR TO TESTING. WELL SI AND SECURE. HAND OVER TO DSO. FINAL T/I/0 = 150/500/0 PSI. 09/24/14 T/I/O=202/288/0 Temp=S/I ***(CMIT-TxIA, MIT-0/A)***Pumped 111 bbls of crude down IA to obtain a LLR @ .17 Job postponed due to confined space entry in cellar to rig up to the OA FWHP's=609/450/0 WV,SV,SSV=C MV=O CV's=0 DSO notified of well status upon LRS departure. 09/26/14 T/I/O=SSV/396/20. Temp= SI. MIT x OA failed to 2000 psi (Drilling Screening).AL SI @ casing valve (1940 psi). Initial OA FL= near surface. Pressured up the OA to 2000 psi w/3 bbls DSL. The OA lost 234 psi in 4 minutes.Attempted to re-pressure to 2000 psi, OAP increased to 1960 psi and started dropping. Established a LLR @ 1000 psi of.19 BPM (see log tab for details). Bled OAP(—.5 bbls, all fluid).The OAP increased 83 psi during the RD (45 min). Job complete.Tags hung on the OA/wing,fluid packed annulus sign hung from previous job. FWP's= SSV/394/100. SV, WV, SSV= C. MV=O. IA, OA=OTG. 1600 hrs. Page 1 of 3 11 -30, Well History (Pre-Rig Workover) Date Summary 09/27/14 T/I/O=470/402/155 TEMP=SI (DRLG SCREEN (MAINT))***CMIT TxIA***(FAIL). Pumped 30 bbls down IA and failed to achive CMIT TxIA test pressure of 2500 psi. pumped an additional 180 bbls to establish an estimated LLR @ 2.07 bbls min. Caution tags and AFE sings hung. Notified PE, Pad-OP, FWHP= 424/247/595.Well SI upon departure. 09/29/14 INITIAL T/I/O=400/150/100. HAVING TROUBLE WITH THE WIRELINE ACQUISITION SYSTEM. TROUBLESHOOTING WHY THE SOFTWARE WILL NOT COMMUNICATE WITH THE ACQUISITION SYSTEM. RIH.TOOLSTRING: HEAD/WEIGHTS/PBMS/INLINE SPINNER/PFCS. LENGTH =31'; WEIGHT=300 LBS; MAX OD=2.125". SPINNER AND CALIPER NOT READING ANTICIPATED VALUES DOWNHOLE. BP AND SLB DECIDE TO POOH AND INVESTIGATE THE ISSUE. JOB MAY BE POSTPONED DUE TO TIME CONTRAINTS. AT SURFACE. BP WELLSITE LEADER DECIDES TO POSTPONE JOB UNTIL THE MORNING. SLB CREW TROUBLESHOOTING TOOL PROBLEMS. LAY DOWN LUBRICATOR AND LEAVE FOR THE NIGHT. FINAL T/I/O=400/ 150/100. 09/29/14 T/I/O=298/99/124 Temp= SI Assist E-Line W/LDL(DRLG SCREEN Maint) Rigged up to IA. EL tool not working. Job postponed. FWHPS=300/100/125. 09/30/14 T/I/0=300/100/130 Temp=S/I (Assist E-Line with LDL) Pumped 5 bbls meth followed by 286 bbls of 110* crude down IA while EL logged. EL in control of well upon departure. Tag hung on IA&WV,AFE sign hung on Master valve. FWHPS=100/100/500. 09/30/14 INITIAL T/I/O =400/150/100. RIH.TOOLSTRING: HEAD/GR-CCL-PRESS-TEMP/ILS/FBS. LENGTH =32'; MAX OD=2.125"; WEIGHT=300 LBS; FN = 1.38". PERFORMED A STATION PASS WHILE LRS PUMPING UP TUBING. 860 PSI ON TUBING WHEN THE PLUG BEGAN TO LEAK. PERFORM A 10 MINUTE STATION LOG AT BOTTOM AND THEN PERFORM DYNAMIC PASS UP WHILE PUMPING 2 BPM OF CRUDE. BP ENGINEER DECIDES TO HAVE US RIG DOWN AND SET AN IBP TOMORROW. FINAL T/I/O=300/0/250. 10/01/14 INITIAL T/I/O =250/0/100. TOOLSTRING: HEAD/CCL/BAKER 4.5" IBP; LENGTH =44 FT;WEIGHT= 375 LBS; MAX OD=3.0". COULD NOT GET PAST 11260 FT WITH PLUG ON FIRST ATTEMPT. GOING TO TIE IN ABOVE TUBING TAIL. SETTING DEPTH = 11212'; CCL TO MID ELEMENT=23.7 FT; CCL STOP DEPTH = 11188.3'. RIG DOWN COMPLETE. FINAL T/I/O =250/0/100. 10/01/14 T/1/0=212/0/150 CMIT Tx IA to 3000 psi**PASS**(2nd Attempt) Pumped 18 bbls Crude down IA to achieve test pressure TBG/IA lost 24/22 psi 1st 15 min and 17/17 psi 2nd 15 min for total loss of 41/39 over 30 min test Bleed TBG/IA pressure to 0 psi—9 bbls SV, SSV,WV=Closed MV=Open IA/OA= OTG's FWHP's=300/300100 Caution Tags hung on IA&MV AFE sign already on MV DSO notified upon departure. 10/05/14 PULL BAKER 3.00" IBP FROM 11,186' SLM(all intact, no issues). 11/25/14 INITIAL T/I/O=200/100/100 PSI. RIH AND TAG TOC @ 11606'WITH FIRST BAILER. RAN A TOTAL OF 4 RUNS OF CEMENT DUMP BAILERS FOR APPROXIMATELY 10'OF ADDITIONAL CEMENT. (ESTIMATED TOC OF NEW CEMENT= 11,596' ELM). CURRENTLY POOH TO RIG DOWN. 11/26/14 RIGGED DOWN ELINE EQUIPMENT.WELL SHUT IN ON DEPARTURE DSO NOTIFIED. FINAL T/I/O = 130/100/100 PSI. 11/26/14 Rig up and pressure test surface equipment. Page 2 of 3 11 -30, Well History (Pre-Rig Workover) Date Summary 11/27/14 T/I/O 131/76/131 Temp=SI CMIT-TxIA(pre CTD) CMIT-TxIA FAILED to 3000 psi. Pump 4 bbls crude down tubing to achieve 500 psi at 2 bpm. Pressure fell off rapidly when came off pump with no psi change on IA. Pump 30 bbls crude down IA at 1.5 bpm to achieve 470/780 psi. Pressure fell off rapidly when came off pump. DHD shot a fluid level after fluids pumped and both tubing and IA levels were at surface. FWHP 70/70/114 SV,WV,SSV=closed, MV=open, IA and OA=OTG. Tags hung on IA and master,AFE sign hun on master. 11/27/14 T/I/O =80/80/110.Temp=SI.Tbg& IA FL(fullbore request).AL SI @ casing valve. Tbg & IA FL© surface. Fullbore in control of valves upon departure. 12/02/14 INITIAL T/1/O=0/100/100. MIRU. NOTICE SPOTS ON SIDE OF HEATER. NOTIFY WSL. CONTINUE RIG UP. PT. RIH WITH 5' MEDIUM PUNCHER. PULL INTO SHOTTING POSITION. CCL STOP DEPTH = 11116.33', CCL TO TOP SHOT=5.67', PUNCHED INTERVAL= 11122'- 11127'. PUNCHED CONFIMED WITH 100 PSI GAIN ON THE TUBING. POOH. BREAK DOWN PUNCHER. MAKE UP RCT. RIH WITH RCT. DID NOT STICK PULLING OFF. CCL STOP DEPTH = 11,135', CCL TO CUT=9.33', TUBING CUT AT 11,145'. POOH. RDMO. WELL HANDED OVER TO DSO ON DEPARTURE. PERMIT CLOSED. FINIAL T/I/O=60/0/100. 12/02/14 T/I/0=Temp=S/I Circ out(RWO)Job in progress Standby for Eline and Hardline crew. 12/03/14 T/I/O=46/-6/129 TEMP= SI Circ out(RWO) Pumped 10 bbls meth down F/L to confirm flowpath and work F/L ice plug. Speared into tbg with 18 bbls meth, circ'd well out with 1159 bbls 1%kcl taking returns up IA to F/L of well 23, Pumped 2 bbls meth and 170 bbls 90*diesel down tbg and U-tubed to IA. Pumped a 10 bbl meth spear and 180 bbls crude Have IGV closed and pressured F/L to 1500 psi with 2 bbls meth. SV,WV, SSV=C MV=0 FWHP's=0/0/120 DSO notified of well status. 01/19/14 T/I/0=Vac/0/100 Set BPV# 141 © 125" RDMO. Final T/I/O= BPV/0/100. 12/21/14 T/I/O=TWC/0/140 Installed second 2-1/16"temp, IA& OA valves onto existng IA&OA valves. FWP=TWC/0/140. Page 3 of 3 North America-ALASKA-BP Page 1 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/21/2014 113:00 - 15:00 2.00 ' MOB P PRE PJSM,MOVE OFF OF WELL 15-24 -BRIDLE UP BLOCKS,R/D RIG FLOOR -EMPTY CUTTING TANK 15:00 - 16:00 1.00 MOB P PRE PJSM,LOWER DERRICK AND SECURE ON DERRICK STAND -PREP RIG FOR MOVE OFF WELL -FUNCTION MOVING SYSTEM,TEST ESD 16:00 - 17:30 1.50 MOB P PRE PJSM,JACK RIG UP,REMOVE SHIMS -PULL OFF OF WELL DS15-24 STAGE ON PAD FOR BOP REMOVAL 17:30 18:00 0.50 MOB P PRE REMOVE BOP FROM CELLAR AND SECURE ON BOP STAND FOR TRANSPORT 18:00 - 18:30 0.50 MOB P PRE INSTALL REAR BOOSTER WHEELS IN CELLAR -CONNECT HYD LINES AND FUNCTION TEST 18:30 - 00:00 5.50 . MOB P PRE MOVE RIG FROM DS15,DOWN OXBOW ROAD TO GUARD SHAKY" 12/22/2014 00:00 - 01:30 1.50 MOB P PRE !PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -INSPECT MOVING SYSTEM BEFORE PROCEEDING WITH RIG MOVE I-COMPLETE CELLAR WELDING PROJECT 01:30 - 04:00 2.50 MOB • P PRE MOVE RIG FROM GUARD SHACK"Y"NEAR MCC TO DS11 -PULL ON PAD AND POSITION ON PAD FOR BOOSTER WHEEL REMOVAL 104:00 - 06:00 2.00 MOB P PRE IPJSM,REMOVE REAR BOOSTER WHEELS -INSTALL BOP ON STAND IN CELLAR 06:00 - 10:00 4.00 MOB P PRE PJSM.NOTIFY DRILL SITE OPERATOR OF INTENT AND SPOT RIG OVER WELL. -SHIM RIG,SPOT CUTTINGS BOX AND SECURE STAIR WAYS. -PJSM.RAISE DERRICK AND PIN,RIG UP • FLOOR. -RIG ACCEPTED @ 10:00 HRS,12/22/2014. 10:00 - 15:30 5.50 KILLW P DECOMP PJSM.RIG UP CELLAR. -BRIDLE DOWN AND RIG UP LINES IN CELLAR. -INSTALL FLANGE ON WING VALVE ON TREE W/1502 UNION. -CONTINUE RIGGING UP LINES TO KILL WELL AND TAKE ON 8.5 PPG HEATED SEAWATER. 15:30 16:30 1.00 KILLW P DECOMP HOLD A RIG EVACUATION DRILL,(H2S !RELEASE ON RIG FLOOR). -MUSTER AREA WELL SITE LEADER SHACK, ALL SERVICE HAND AND TRUCK DRIVERS NOTIFIED. -HEAD COUNT IS 100%,DRILL SITE OPERATOR AND FLOW 2 NOTIFIED. -AAR HELD,SECONDARY MUSTER AREA IDENTIFIED AND GOOD DISCUSSION. 16:30 - 17:00 0.50 KILLW P DECOMP PJSM,TEST ALL CIRCULATING LINES AND CELLAR WELL KILL MANIFOLD -250/3500 PSI,5 MIN,CHART 17:00 - 19:00 2.00 WHSUR P DECOMP PJSM,M/U DSM LUBRICATOR,TEST,250/ 3500 PSI,CHART -PULL BPV,TUBING AND IA ARE AN AVACUUM,L/D LUBRICATOR Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 2 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 00:00 5.00 KILLW P DECOMP PJSM,WITH ALL CREW FOR WELL KILL OPERATIONS -REVIEW PRESSURE CROSS CHECK LIST. -TUBING AND IAARE ON A VACUUM PUMP 175 BBLS OF 120 DEGREE 8.5 PPG SEA WATER DOWN TUBING,TAKE RETURNS THRU CHOKE TO FLOW BACK TANK(FBT) -STAGE PUMPS UP FROM 4 BPM TO 7 BPM= 575 PSI,FLUID RETURNS AT 51 BBLS PUMPED, DIESEL RETURNS=46 BBLS,THEN SEA WATER RETURNS -CLOSE CHOKE,BULLHEAD 20 BBLS DOWN TUBING,4 BPM=1510 PSI -STOP PUMPS,PRESSURE FELL OFF QUICKLY -PUMP ATOTAL OF 922 BBLS 8.5 PPG SEA WATER DOWN TUBING,7 BPM=660 PSITAKING RETURNS THRU CHOKE TO FBT -TOTAL LOSS TO WELL DURING CIRCULATIION=164 BBLS 8.5 PPG SEA WATER -SUCK OUT FLOW BACK TANK AS NEEDED 12/23/2014 00:00 - 02:00 2.00 KILLW P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -MONITOR WELL,FLOW CHECK STATIC LOSS RATE=24 BPH. 02:00 - 05:30 3.50 WHSUR P DECOMP PJSM,R/D CELLAR CIRC LINES -R/U DSM LUBRICATOR,TEST 250/3,500 PSI, 5 MIN,CHART. -TEST TWC.PERFORM ROLLING TEST FROM UNDERNEATH BY PUMPING INTO I/A. -TEST @ 1,000 PSI F/5 MIN,OK. -TEST TWC FROM ABOVE @ 250/3,500 PSI FOR 5 CHARTED MINS EACH. 05:30 - 08:00 2.50 WHSUR P DECOMP PJSM.CLEAR CELLAR. -N/D TREE AND ADAPTER FLANGE.CLEAN AND INSPECT HANGER THREADS. -CHECK THREADS W/4 1/2"NSCT X/O,6 1/2 TURNS,OK. 08:00 - 14:00 6.00 BOPSUR P DECOMP PJSM.CLEAR CELLAR OF ANY OBSTACLES. -NIPPLE UP 13 5/8"X 5M BOPE.N/U SPACER SPOOL. -RIG UP KOOMEY HOSES AND TURN BUCKLES. -NIPPLE UP STACK LOSSES TO WELL LAST (12)HRS=324 BBLS OF 8.5 PPG SEAWATER. 14:00 - 19:00 5.00 BOPSUR P DECOMP PJSM.RIG UP TEST EQUIPMENT. -CONDUCT FULL TEST ON BOPE,BOB NOBLE WITH AOGCC WAIVED STATES RIGHT TO WITNESS. -UTILIZE 4"AND 4 1/2"TEST JTS, CONTINUOUS HOLE FILL THROUGHOUT TESTING OPERATIONS. -LOSS RATE IS 28 BPH. -BLOW DOWN LINES. -VOID BOP STACK OF FLUID. -RIG DOWN BOPE TEST EQUIPMENT. Printed 1/2612015 1:41:51 PM North America-ALASKA-BP Page 3 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project.Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 DHB P r DECOMP PJSM WITH RIG AND DSM CREW. RETRIEVE TWC. -R/U DUTCH RISER AND DSM LUBRICATOR. -TEST DSM LUBRICATOR AND DUTCH RISER TO 250/3,500 FOR 5 CHARTED MINS EACH. TEST PASS. -RETRIEVE TWC WITH TESTED LUBRICATOR. -R/D AND L/D DSM LUBRICATOR AND DUTCH RISER. 21:00 - 22:00 1.00 PULL P DECOMP PJSM WITH RIG CREWAND FMC REPS. PULL TUBING HANGER FREE TO RIG FLOOR. -M/U LANDING JT WITH X-OVER TO TUBING HANGER. -VERIFY ZERO PRESSURE ON IA. IA ON VACUUM. 1-FMC REPS,BOLDS. *LDS OUT=4-3/4", LDS IN=3-3/4" -PULL TUBING HANGER FREE TO RIG FLOOR. TUBING HANGER PULLED FREE WITH 165K ON WT INDICATOR.(3K OVER PULL) PUW=150K, SOW=125K 22:00 - 00:00 2.00 PULL P DECOMP PJSM WITH REVIEW OF PRESSURE CROSSCHECK. CIRCULATE BOTTOMS UP THROUGH MUD GAS SEPARATOR. -FILL TBG AND WELLBORE. 34 BBLS -CLOSE ANNULAR PREVENTER. -CIRC B/U THRU MGS AT 6 BPM WITH 240 PSI. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 330 BBLS/±27 BPH 12/24/2014 00:00 - 01:30 1.50 PULL P DECOMP CIRCULATE. -CIRC B/U THRU MGS AT 6 BPM WITH 240 PSI. *ICP=240 PSI, FCP=240 PSI -OBTAIN SPR's. 4 BPM WITH 60 PSI, 5 BPM WITH 100 PSI. -10 MIN FLOW CHECK. WELL ON VACUUM. WELL TAKING±25 BPH. *CONTINUOUSLY MONITOR AND FILL WELLBORE AT±25 BPH. -VERIFY NO PRESSURE AND OPEN ANNULAR PREVENTER. -L/D TUBING HANGER AND LANDING JT. -M/U X-OVER FOR WELL CONTROL EQUIPMENT. Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 4 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 12:00 10.50 PULL P DECOMP PJSM.PULL OUT OF HOLE,LAYING DOWN 4-1/2"COMPLETION. -POOH,L/D 4-1/2"12.6#13CR-80 VAM ACE COMPLETION,F/RCT CUT AT 11,143'ELM. 1-ESTABLISH PARAMETERS. '*PUW= 60K, SOW=60K.(ALL WT CHECKS INCLUDE 40K TOP DRIVE.) COLLAPSE ON BOTTOM OF JT 76 AT COLLAR,3242'. 1 45K OVER PULL,(PULLED THROUGH TIGHT SPOT),ON JT 89+20'OUT OF HOLE,115K UP WT. -THIS WOULD PUT THE END OF THE CUT© APPROXIMATELY 7338'. 30K OVER PULL AND PULLED THROUGH,JT 144+20'OUT,95K UP WT,5086'END OF CUT. -30K OVERPULL AND PULLED THROUGH JT# 182+20',UP WT=75K. 3356'END OF CUT. -NOTIFY ODE OF TIGHT SPOT IN 9-5/8"CSG AND DISCUSSED PLAN FORWARD. *CONTINUOUSLY MONITOR AND FILL WELLBORE AT±25 BPH. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 348 BBLS 12:00 - 12:30 0.50 PULL P DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 'OPEN OA TO FLOWBACKTANKAT 12:00 HRS AND CONTINUOUSLY MONITOR,IN PREPARATION FOR REPLACING 9-5/8"ICP. 12:30 - 14:00 1.50 ' PULL P DECOMP PJSM.PULL OUT OF HOLE,LAYING DOWN 4-1/2"COMPLETION. -POOH,L/D 4-1/2"12.6#13CR-80 VAM ACE COMPLETION,F/1,607'T/SURFACE. RECOVERED= 261 JTS OF 4-1/2"TBG,1-X NIPPLE,5-GLM AND 1-CUT JT OF 4-1/2"TBG (17'LONG). 14:00 - 15:00 1.00 PULL P DECOMP PJSM. CLEAN RIG FLOOR. -CLEAN AND CLEAR RIG FLOOR OF POWER TONGS AND 4-1/2"HANDLING EQUIPMENT. 15:00 - 15:30 0.50 WHSUR P DECOMP PJSM.INSTALL WEAR BUSHING. -R/U AND INSTALL WEAR BUSHING. *WEAR BUSHING ID=9" Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 5 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 23:00 7.50 CLEAN I C DECOMP PJSM. LOAD AND TALLY 4"HT-38 DRILL PIPE. -LOAD AND TALLY 4"HT-38 DP IN PIPE SHED. -ASSEMBLE COMPONENTS FOR 9-5/8" CLEAN-OUT BHA. -MOBILIZE 4"HT-38 DP F/DS-15 T/DS-11. *SIMOPS: RIG CREW WORKING ON DDI MP2's, BETWEEN WAITING ON LOADS OF 4"HT-38 DP F/DS-15. -P/U,M/U AND STAND BACK 2-STDS OF 6-1/4"DRILL COLLARS. *CONTINUOUSLY MONITOR AND FILL WELLBORE AT±25 BPH. *SHUT-IN OA AT 16:00 HRS. 23:00 - 00:00 1.00 CLEAN C DECOMP PJSM WITH BAKER REP. MAKE UP 9-5/8" CLEAN-OUT BHA#1. -MOBILIZE CLEAN-OUT BHA COMPONENTS TO RIG FLOOR. -P/U,M/U AND RIH WITH 9-5/8"CLEAN-OUT 'BHA,AS PER BAKER REP. *CONTINUOUSLY MONITOR AND FILL WELLBORE AT±25 BPH. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 305 BBLS 12/25/2014 00:00 - 00:30 0.50 CLEAN C DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-So AND BLOCKS. INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- 'GOOD. *CONTINUOUSLY MONITOR AND FILL WELLBORE AT±25 BPH. *OA PRESSURE AT 00:00 HRS=220 PSI 00:30 - 02:00 1.50 CLEAN C DECOMP PJSM WITH BAKER REP. CONTINUE MAKING UP 9-5/8"CLEAN-OUT BHA#1. -P/U,M/U,AND RIH WITH 9-5/8"CLEAN-OUT BHA T/256'. 02:00 - 06:00 4.00 CLEAN C DECOMP RUN IN HOLE WITH 9-5/8"CLEAN-OUT BHA#1. -RIH WITH 9-5/8"CLEAN-OUT BHA,P/U 4" HT-38 DP FROM PIPE SHED F/255'AND TAG OBSTRUCTION AT 3,257'(BULLNOSE DEPTH). Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 6 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 'X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 CLEAN C DECOMP PJSM WITH BAKER REP. ATTEMPT TO WORK PAST OBSTRUCTION IN 9-5/8"CASING. -ACQUIRE SLOW PUMP RATES. 3 BPM WITH 40 PSI,4 BPM WITH 100 PSI. ESTABLISH PARAMETERS. PUW=102K, SOW=99K, RTW=100K(ALL WT CHECKS INCLUDE 40K TOP DRIVE),RPM= 60 WITH 3-4K FREE TORQUE,PUMP RATE=5 BPM WITH 240 PSI -WASH AND REAM THRU OBSTRUCTION F/ 3,257'T/3,277'. 1-2K WOM WITH 5-8K TORQUE, PUMP RATE 5 BPM WITH 240 PSI. -WASH,REAM AND ATTEMPT TO WORK PAST OBSTRUCTION AT 3,277'WITH 5-10K WOM AND NO INCREASE IN TORQUE;NO SUCCESS. -PUH AND STOP ROTATING,RBIH AND TAG AT 3,277'WITH 10K DOWN. I-CONSULTAND DISCUSS PLAN FORWARD WITH ODE AND RWO SUPERINTENDENT. DECISION MADE TO POOH AND INSPECT CLEAN-OUT BHA WEAR PATTERN. 08:30 - 10:30 2.00 CLEAN C DECOMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 9-5/8"CLEAN-OUT BHA#1. -BLOW DOWN TOP DRIVE. -POOH WITH CLEAN-OUT BHA,STANDING BACK 4"DP F/3,277'T/3,019'AND OBSERVED 50K OVERPULL. -SET DOWN AND TAKING WT WITH NO MOVEMENT.PICK UP AND HIT DOWN WI BUMPER SUB. -STRING FREE,M/U TOP DRIVE,BRING ON PUMP AT 7 BPM WITH 420 PSI. -PUMP 30 BBLS HI-VIS SWEEP AROUND. -BACK REAM UP SLOWLY OBSERVING FREQUENT STALLS ROTATING WITH 8K FT/LBS OF TORQUE. -WORK STRING FREE AND POOH F/3,019'TI 3,004'WITH NO OVERPULL. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 275 BBLS `AVERAGE LOSS RATE LAST 12 HRS=23 BPH 10:30 - 14:30 4.00 CLEAN C DECOMP SHUT DOWN FOR CHRISTMAS,CREWS RELAX AND CALL HOME. -TOOLPUSHER,ROUSTABOUT PUSHER AND PIT WATCHER REMAIN ON RIG. 'TOP DRIVE MADE UP AND WELL SECURE. 'CONTINUOUSLY MONITOR AND FILL WELLBORE AT±20 BPH. *OA PRESSURE AT 12:00 HRS=180 PSI 14:30 - 17:30 3.00 CLEAN C DECOMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 9-5/8"CLEAN-OUT BHA#1. -BACKREAM 1-STD F/3,004'T/2,910'. *PUMP RATE=7 BPM WITH 420 PSI,RPM=60 WITH 3-4K TORQUE -BLOW DOWN TOP DRIVE. POOH WITH CLEAN-OUT BHA,STANDING BACK 4"DP F/2,910'T/256'. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 7 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 20:30 3.00 CLEAN C DECOMP PJSM WITH BAKER REP. INSPECT AND LAY DOWN 9-5/8"CLEAN-OUT BHA#1. -10 MIN FLOW CHECK,BEFORE PULLING NON-SHEARABLES THRU BOP STACK WELL TAKING±20 BPH. -POOH,INSPECT AND UD CLEAN-OUT BHA. RECOVERED:2 GAL OF METAL SHAVINGS FROM STRING MAGNETS,2-LARGE PIECES OF METAL(3"x 3"x 1.5")FROM BETWEEN 8-1/2"STRING MILL BLADES. OBSERVED BOTTOM TAPER OF 8-1/2" STRING MILL BLADES WORN OFF AND GROOVED,CREATING A SQUARE SHOULDER. -CONSULT AND DISCUSS PLAN FORWARD WITH ODE AND RWO SUPERINTENDENT. -DECISION MADE TO RUN THE CLEAN-OUT BHA AGAIN,LEAVING THE UPPER 8-1/2" STRING MILL OUT. 20:30 - 21:30 1.00 CLEAN C DECOMP PJSM WITH BAKER REP. MAKE UP 9-5/8" CLEAN-OUT BHA#2. -P/U,M/U,AND RIH WITH 9-5/8"CLEAN-OUT BHA T/250'. 21:30 - 23:00 1.50 CLEAN C DECOMP RUN IN HOLE WITH 9-5/8"CLEAN-OUT BHA#2. -RIH WITH 9-5/8"CLEAN-OUT BHA,ON 4" HT-38 DP FROM DERRICK F/250'AND TAG OBSTRUCTION AT 3,285'(BULLNOSE DEPTH). 23:00 - 00:00 1.00 CLEAN C DECOMP ATTEMPT TO WORK PAST OBSTRUCTION IN 9-5/8"CASING. -ACQUIRE SLOW PUMP RATES. 3 BPM WITH 40 PSI,4 BPM WITH 100 PSI. -ESTABLISH PARAMETERS. PUW=100K, SOW=95K, RTW=100K(ALL WT CHECKS INCLUDE 40K TOP DRIVE),RPM= 60 WITH 2-3K FREE TORQUE,PUMP RATE=5 BPM WITH 220 PSI WASH,REAM AND WORK THRU OBSTRUCTION WITH 2-7K WOM(TORQUE= 5-7K)F/3,285'T/3,286'. FLUID LOSS FROM 12:00 HRS-00:00 HRS= 272 BBLS Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 8 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/26/2014 00:00 01:30 1.50 CLEAN C DECOMP PJSM WITH BAKER REP. ATTEMPT TO WORK PAST OBSTRUCTION IN 9-5/8"CASING. -ACQUIRE SLOW PUMP RATES. I*3 BPM WITH 50 PSI,4 BPM WITH 80 PSI. -ESTABLISH PARAMETERS. *PUW=100K, SOW=95K, RTW=100K(ALL WT CHECKS INCLUDE 40K TOP DRIVE),RPM= 60 WITH 2-3K FREE TORQUE,PUMP RATE=5 BPM WITH 220 PSI -WASH,REAM AND WORK THRU OBSTRUCTION WITH 2-7K WOM(TORQUE= 5-7K)F/3,286'T/3,287'(BULLNOSE DEPTH). *CLEARED OBSTRUCTION. '-WASH AND REAM THRU OBSTRUCTED AREA SEVERAL TIMES F/3,285'T/3,314'. -WORK THRU OBSTRUCTED AREA 3 TIMES, WITH NO ROTATION F/3,285'T/3,314'. *2K WT DOWN F/3,284'T/3,287' -WORK THRU OBSTRUCTED AREA 2 TIMES, WITH NO ROTATION OR CIRC F/3,285 TI 3,314'. 1*2K WT DOWN F/3,284'T/3,287' 01:30 02:30 1.00 CLEAN ' C DECOMP 1H2S/RIG EVACUATION DRILL. -TABLE TOP,WALK THROUGH H2S RIG EVAC DRILL. *DISCUSSED RESPONSIBILITIES,EVAC ROUTES,WIND DIRECTION AND NOTIFICATIONS. -PJSM WITH BAKER REP ON RIH WITH CLEAN-OUT BHA#2,P/U 4"HT-38 DP FROM PIPE SHED. 02:30 - 10:00 7.50 CLEAN C DECOMP RUN IN HOLE WITH 9-5/8"CLEAN-OUT BHA#2. -RIH WITH 9-5/8"CLEAN-OUT BHA,P/U 4" HT-38 DP FROM PIPE SHED F/3,314'AND TAG OBSTRUCTION AT 3,359'.(BULLNOSE DEPTH). -WASH,REAM AND WORK THRU OBSTRUCTION WITH 5-7K WOM(TORQUE= 5-7K)F/3,359'T/3,367'(BULLNOSE DEPTH). *CLEARED OBSTRUCTION. -WASH AND REAM THRU OBSTRUCTED AREA SEVERAL TIMES F/3,359'T/3,367'. -WORK THRU OBSTRUCTED AREA 3 TIMES, WITH NO ROTATION F/3,359'T/3,367'. 4K WT DOWN F/3,359'T/3,367'. -WORK THRU OBSTRUCTED AREA 2 TIMES, WITH NO ROTATION OR CIRC F/3,359'T/ 3,367'. 4K WT DOWN F/3,359'T/3,367'. -RIH WITH 9-5/8"CLEAN-OUT BHA,P/U 4" HT-38 DP FROM PIPE SHED F/3,367'T/5,837'. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 9 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 12:00 2.00 CLEAN C DECOMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 9-5/8"CLEAN-OUT BHA#2. -ESTABLISH PARAMETERS. *PUW=135K, SOW=115K -ACQUIRE SLOW PUMP RATES. *3 BPM WITH 50 PSI,4 BPM WITH 80 PSI. -POOH WITH 9-5/8"CLEAN-OUT BHA F/5,837' T/2,145'. *OBSERVED 2-3K OVERPULLAT 3,347'AND 3,324' *CONTINUOUSLY MONITOR AND KEEP WELLBORE FULL AT±20 BPH. •FLUID LOSS FROM 00:00 HRS-12:00 HRS= 222 BBLS *AVERAGE LOSS RATE LAST 12 HRS=18.5 BPH 12:00 - 12:30 0.50 CLEAN C DECOMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 9-5/8"CLEAN-OUT BHA#2. -POOH WITH 9-5/8"CLEAN-OUT BHA F/2,145' IT/344'. *OA PRESSURE AT 12:00 HRS=180 PSI 12:30 - 17:30 5.00 CLEAN ! C DECOMP PJSM WITH BAKER REP. LAY DOWN 9-5/8" CLEAN-OUT BHA#2. -10 MIN FLOW CHECK BEFORE PULLING NON-SHEARABLE THRU BOPE STACK. WELL ON VACUUM,TAKING±20 BPH. -POOH F/344',INSPECT AND L/D 9-5/8" 'CLEAN-OUT BHA. *RECOVERED 3-GALS OF METAL SHAVINGS j FROM STRING MAGNETS. *OBSERVED UPPER TAPER OF 8-1/2"STRING MILL BLADES WORN OFF. CLEAN AND CLEAR RIG FLOOR OF 9-5/8" CLEAN-OUT BHA. 17:30 - 20:30 3.00 CLEAN C DECOMP PJSM WITH HES REP. RUN IN HOLE WITH HES 9-5/8"RBP. -P/U,M/U AND RIH WITH 9-5/8"RBP,ON 4"DP FROM DERRICK T/4,200'. -ESTABLISH PARAMETERS. *PUW=100K, SOW=96K Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 10 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 CLEAN C DECOMP PJSM WITH HES REP. SET HES 9-5/8"RBP AND ATTEMPT TO PRESSURE TEST 9-5/8" CASING TO 3,000 PSI. -WASH ACROSS 9-5/8"RBP SETTING AREA, RECIPROCATING STRING 60'AND PUMPING 4.5 BPM WITH 110 PSI. SET 9-5/8"RBP,AS PER HES REP AT 4,200' (COE). *SET DOWN 25K TO ENSURE GOOD SET. R/U TEST EQUIPMENT. PURGE LINES AND CLOSE UPPER PIPE RAMS. -ATTEMPT TO PRESSURE TEST 9-5/8"CSG TO 3,000 PSI,WHILE MONITORING OA ON GAUGE. *INITIAL OA PRESSURE=180 PSI -PRESSURE UP ON 9-5/8"CSG TO 800 PSI AND OA PRESSURE INCREASED TO 960 PSI. !PRESSURE TEST FAILED. *3.2 BBLS TO PRESSURE UP TO 800 PSI. SHUT DOWN PUMP AND HOLD PRESSURE FOR 5 MINS. NO PRESSURE LOSS. BLED OFF ALL PRESSURE. .-VERIFY NO PRESSURE AND OPEN UPPER •PIPE RAMS. -BLOW DOWN TOP DRIVE AND LINES. R/D TEST EQUIPMENT. 22:00 - 00:00 2.00 DHB C ' DECOMP PJSM WITH HES REP. RUN IN HOLE WITH 9-5/8"RBP. i-UNSET 9-5/8"RBP,AS PER HES REP. *ALLOW ELEMENTS TO RELAX AND RIH PAST SETTING DEPTH TO ENSURE RBP UNSET. -RIH WITH 9-5/8"RBP,ON 4"DP FROM DERRICK F/4,200'T/5,610'. -RIH WITH 9-5/8"RBP,P/U 4"DP FROM PIPE SHED F/5,610'T/6,052'. PUW=125K, SOW=110K *CONTINUOUSLY MONITOR AND KEEP WELLBORE FULL AT±20 BPH. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 194 BBLS *AVERAGE LOSS RATE LAST 12 HRS=16 BPH *OA PRESSURE AT 00:00 HRS=180 PSI 12/27/2014 00:00 - 00:30 0.50 DHB C DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. *OA PRESSURE AT 00:00 HRS=220 PSI 00:30 - 07:30 7.00 DHB C DECOMP PJSM WITH HES REP. RUN IN HOLE WITH 9-5/8"RBP. -RIH WITH 9-5/8"RBP,P/U 4"DP FROM PIPE SHED F/6,052'T/10,946'. *CONTINUOUSLY MONITOR AND KEEP WELLBORE FULLAT±20 BPH. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 11 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 07:30 - 10:00 2.50 DHB C DECOMP PJSM WITH HES REP. SET HES 9-5/8"RBP. -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. 1*2 BPM WITH 70 PSI, 3 BPM WITH 200 PSI ESTABLISH PARAMETERS. *PUW=190K, SOW=133K.-ALL WT CHECKS INCLUDE 40K TOP DRIVE. -ATTEMPT TO SET 9-5/8"RBP AT 10,947'(346 JTS),AS PER HES REP SEVERAL TIMES, USING VARIED TECHNIQUES.-NO SUCCESS. -WASH AROUND 9-5/8"RBP AT 6.5 BPM WITH 700 PSI. -CONSULT TOWN AND DISCUSS PLAN FORWARD. *OPT TO TAG TOP OF TUBING STUB AND VERIFY BRIDGE PLUG IS STILL ATTACHED. -P/U JT#347,RIH 1'TO 10,947'AND 9-5/8" RBP SET W/20K DOWN. *VERIFY SET WITH(2)OVER PULLS. -RELEASE RUNNING TOOL FROM 9-5/8"RBP. *9-5/8"RBP SET AT 10,947'. 10:00 - 12:00 2.00 DHB C DECOMP PJSM.PULL OUT OF HOLE WITH 9-5/8"RBP RUNNING TOOL. -BLOW DOWN TOP DRIVE AND UD 1-JT OF 4" DP. -10 MIN FLOW CHECK. WELL STABLE. -POOH WITH 9-5/8"RBP RUNNING TOOL, STANDING BACK 4"DP F/10,947'T/9,021'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 199 BBLS *AVERAGE LOSS RATE LAST 12 HRS=16.5 BPH *OA PRESSURE AT 12:00 HRS=190 PSI 12:00 - 12:30 0.50 DHB C DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 12:30 - 17:30 5.00 DHB C DECOMP PJSM.PULL OUT OF HOLE WITH 9-5/8"RBP RUNNING TOOL. -POOH WITH 9-5/8"RBP RUNNING TOOL, STANDING BACK 4"DP F/9,021'T/190'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -10 MIN FLOW CHECK,BEFORE PULLING NON-SHEARABLES THRU BOP STACK WELL STABLE. -L/D 2-STDS OF 6-1/4"DRILL COLLARS AND 9-5/8"RBP RUNNING TOOL. 17:30 - 18:00 0.50 EVAL C DECOMP PJSM WITH RIG AND SLB E-LINE CREW,ON E-LINE OPERATIONS AND REVIEW DDI SOP. RIG UP SLB E-LINE UNIT AND EQUIPMENT. -POSITION AND R/U E-LINE UNIT AND SUPPORT EQUIPMENT. **TABLE TOP WELL CONTROL DRILL WITH E-LINE IN THE HOLE.** Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 12 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UW:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 EVAL C DECOMP RUN MAIN PASS LOG WITH SLB USIT LOGGING TOOL STRING. -P/U,M/U AND SURFACE TEST SLB USIT LOGGING TOOL STRING.-SURFACE TEST GOOD. RIH WITH USIT LOG TOOL STRING T/4,200'. -LOG UP F/4,200'T/SURFACE. *CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 00:00 HRS=180 PSI 12/28/2014 00:00 - 02:30 2.50 EVAL C DECOMP RUN REPEAT PASS LOG WITH SLB USIT LOGGING TOOL STRING. -SURFACE TEST SLB USIT LOGGING TOOL STRING.-SURFACE TEST GOOD. -RIH WITH USIT LOG TOOL STRING T/4,200'. -LOG UP F/4,200'T/SURFACE. 1*CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. 02:30 03:00 0.50 EVAL I C DECOMP PJSM WITH RIG AND SLB E-LINE CREW. RIG DOWN SLB E-LINE UNIT AND EQUIPMENT. -L/D USIT TOOL STRING AND E-LINE EQUIPMENT. -CLEAN AND CLEAR RIG FLOOR OF E-LINE EQUIPMENT. i-R/D SLB E-LINE UNIT AND SUPPORT EQUIPMENT. 03:00 - 06:30 3.50 EVAL C DECOMP PJSM WITH RIG CREWAND HES REP. RUN IN HOLE AND SET HES 9-5/8"RTTS. -P/U,M/U AND RIH WITH 9-5/8"RTTS T/3,800'. -ESTABLISH PARAMETERS. *PUW=94K, SOW=91K -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *2 BPM WITH 50 PSI,3 BPM WITH 70 PSI,4 BPM WITH 110 PSI -SET 9-5/8"RTTS AT 3,800',AS PER HES REP. *SET 20K DOWN ON 9-5/8"RTTS,TO CONFIRM SET. 06:30 - 08:30 2.00 EVAL C DECOMP PJSM WITH RIG CREW AND HES REP WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES.PRESSURE TEST 9-5/8"CASING AND 9-5/8"RBP SET AT 10,947', BELOW 9-5/8"RTTS TO 3,200 PSI. -R/U TEST EQUIPMENT AND PURGE LINES. -PRESSURE TEST 9-5/8"CASING AND 9-5/8" RBP SET AT 10,947'TO 250 PSI FOR 5 CHARTED MINS AND 3,200 PSI FOR 30 CHARTED MINS. TEST PASS. *6.2 BBLS TO ACHIEVE 3,200 PSI. *0 PSI BLEED OFF IN 30 MINUTES. NO PRESSURE INCREASE ON OUTER ANNULUS THROUGHOUT TEST. -BLEED OFF ALL PRESSURE. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 13 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.4ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 09:00 0.50 EVAL C DECOMP PJSM RIG CREWAND HES REP. UN-SET 9-5/8"RTTS. -UN-SET 9-5/8"RTTS,AS PER HES REP. -ENSURE 9-5/8"RTTS RELEASED BY RIH PAST SETTING DEPTH. -10 MIN FLOW CHECK. WELL STABLE. -EVALUATE USIT LOG DATAAND DISCUSS 'PLAN FORWARD WITH WTL,ODE AND RWO I SUPERINTENDENT. *USIT LOG INDICATED 9-5/8"CSG FREE OF CEMENT F/2,500'T/SURFACE AND PARTED/ COLLAPSED 9-5/8"CSG AT 3,260'-3,270'AND 3,340'-3,350'. 09:00 - 10:00 1.00 EVAL C DECOMP PJSM AND REVIEW OF DDI SOP FOR SLIP AND CUT DRILL LINE. SLIP AND CUT DRILLING LINE. -SLIP AND CUT 70'OF DRILL LINE. *INSPECT BRAKES AND FUNCTION TEST CROWN-O-MATIC.TEST PASS. 10:00 - 12:00 2.00 EVAL C DECOMP PJSM WITH RIG CREW AND HES REP. PULL OUT OF HOLE WITH HES 9-5/8"RTTS. -POOH WITH 9-5/8"RTTS,STANDING BACK 4" DP F/3,800'T/1,057'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=180 PSI 12:00 - 12:30 0.50 EVAL C DECOMP I SERVICE RIG. LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 12:30 - 13:00 0.50 EVAL C DECOMP PJSM WITH RIG CREWAND HES REP. PULL OUT OF HOLE AND LAY DOWN HES 9-5/8" RTTS. -POOH WITH 9-5/8"RTTS,STANDING BACK 4" DP F/1,057'T/SURFACE. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -L/D 9-5/8"RTTS. -CLEAN AND CLEAR RIG FLOOR. 13:00 - 00:00 11.00 EVAL X WAIT DECOMP EVALUATE WELL REMEDIATION OPTIONS. -RIG ON STANDBY WITH FULL CREWS, WAITING ON ORDERS. -RIG CREW WORKING ON HOUSEKEEPING AND DDI MP2's. *CONTINUOUSLY MONITOR WELL. WELL STABLE. FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=180 PSI Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 14 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date.1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/29/2014 00:00 - 09:30 9.50 EVAL X WAIT DECOMP EVALUATE WELL REMEDIATION OPTIONS. -RIG ON STANDBY WITH FULL CREWS, WAITING ON ORDERS. -RIG CREW WORKING ON HOUSEKEEPING AND DDI MP2's. **FIRE DRILL FOLLOWED BYAAR.** *CONTINUOUSLY MONITOR WELL. WELL STABLE. 09:30 - 12:00 2.50 DHB C DECOMP PJSM WITH RIG CREW AND HES REP. RUN IN HOLE AND SET 9-5/8"RBP. -P/U,M/U AND RIH WITH 9-5/8"RBP TO 3,454'. ESTABLISH PARAMETERS. PUW=91K, SOW=89K '-ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *2 BPM WITH 40 PSI,6 BPM WITH 180 PSI -SET 9-5/8"TOP OF RBP AT 3,449'(COE AT 3,454'),AS PER HES REP. *SET 20K DOWN ON 9-5/8"RBP,TO CONFIRM SET. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=180 PSI 12:00 - 14:00 2.00 DHB C DECOMP PJSM WITH RIG CREWAND HES REP. PULL OUT OF HOLE WITH 9-5/8"RBP RUNNING TOOL. -POOH AND L/D 9-5/8"RBP RUNNING TOOL F/ 3,449'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. 14:00 - 17:00 3.00 DHB C DECOMP PJSM WITH RIG CREW AND HES REP. RUN IN HOLE AND SET HES 9-5/8"RTTS. -P/U,M/U AND RIH WITH 9-5/8"RTTS T/3,400'. -ESTABLISH PARAMETERS. *PUW=91K, SOW=89K -M/U TOP DRIVE. -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. 3 BPM WITH 70 PSI,4 BPM WITH 90 PSI WASH ACROSS 9-5/8"SETTING DEPTH AT 5 BPM WITH 160 PSI. -SET 9-5/8"RTTS AT 3,400',AS PER HES REP. 'SET 20K DOWN ON 9-5/8"RTTS,TO CONFIRM SET. 17:00 - 19:00 2.00 DHB C DECOMP PJSM WITH RIG CREWAND HES REP WITH PRESSURE CROSS CHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES.PRESSURE TEST 9-5/8"RBP SET AT 3,449'TO 3,200 PSI. -R/U TEST EQUIPMENT AND PURGE LINES. -PRESSURE TEST 9-5/8"RBP SET AT 3,449' TO 250/3,000 PSI FOR 5 CHARTED MINS. TEST PASS. -BLEED OFF ALL PRESSURE. -UN-SET 9-5/8"RTTS,AS PER HES REP. Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 15 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 22:00 3.00 DHB C DECOMP PJSM WITH RIG CREWAND HES REP. PLACE 50'OF 20/40 RIVER SAND ON TOP OF 9-5/8" RBP,SET AT 3,449'. -R/U SAND HOPPER WITH WATER LINE. -PLACE 50'/2,200 LBS/44 SACKS OF 20/40 RIVER SAND ON TOP OF 9-5/8"RBP. R/D SAND HOPPER. POOH F/3,449'T/3,332'. -M/U TOP DRIVE AND PUMP 40 BBLS OF SEAWATER DOWN DP TO ENSURE WORKSTRING IS FREE AND CLEAR OF RIVER SAND. 22:00 00:00 2.00 DHB C DECOMP PJSM WITH RIG CREWAND HES REP. PULL OUT OF HOLE WITH HES 9-5/8"RTTS. -BLOW DOWN TOP DRIVE AND LINES. POOH WITH 9-5/8"RTTS,STANDING BACK 4" DP F/3,400'T/962'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. *CONTINUOUSLY MONITOR WELL. WELL STABLE. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= I 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=180 PSI 12/30/2014 00:00 - 00:30 0.50 DHB C DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 00:30 - 02:00 1.50 DHB C DECOMP PJSM WITH RIG CREWAND HES REP. PULL OUT OF HOLE WITH HES 9-5/8"RTTS. -POOH WITH 9-5/8"RTTS,STANDING BACK 4" DP F/962'T/112'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -10 MIN FLOW CHECK. WELL STABLE. -POOH AND L/D 9-5/8"RTTS F/112'. -CLEAN AND CLEAR RIG FLOOR. 02:00 - 04:00 2.00 DHB C DECOMP PJSM WITH RIG CREWAND HES REP WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. CIRCULATE 13-3/8"x 9-5/8"ANNULUS CLEAN OF DEAD CRUDE FREEZE PROTECT. -CLOSE BLIND/SHEAR RAMS. -R/U LINES AND EQUIPMENT. -CIRC 13-3/8"x 9-5/8"ANNULUS CLEAN OF DEAD CRUDE FREEZE PROTECT;PUMPING DOWN 9-5/8"CSG,TAKING RETURNS THRU THE OA,OUT TO THE FLOWBACK TANK PUMP 40 BBL DEEP CLEAN PILL AND CIRC SAME OUT,UNTIL RETURNS CLEAN UP AT 8.5 BPM WITH 700 PSI. *485 BBLS TOTAL PUMPED. -10 MIN FLOW CHECK. WELL STABLE. -BLOW DOWN AND RIG DOWN CIRCULATING LINES. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 16 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 08:00 4.00 BOPSUR C DECOMP PJSM. CHANGE UPPER PIPE RAMS FROM 2-7/8"x 5"VBR's TO 9-5/8"SOLID BODY RAMS. -VERIFY NO PRESSURE AND OPEN BLIND/SHEAR RAMS. R/U AND RETRIEVE WEAR BUSHING. -INSTALL TEST PLUG. CLOSE BLIND/SHEAR RAMS. -PRESSURE TEST BLIND/SHEAR RAMS AND TEST PLUG TO 250/3,500 PSI FOR 5 CHARTED MIN EACH.TEST PASS. -VOID BOP STACK OF FLUID. -CHANGE UPPER PIPE RAMS F/2-7/8"X 5" VBR TO 9-5/8"SOLID BODY RAMS. *BARRIERS IN PLACE:TESTED 9-5/8"RBP's AT '10,947'AND 3,449',TEST PLUG,CLOSED AND TESTED BLIND/SHEAR RAMS. 08:00 - 09:00 1.00 BOPSUR C DECOMP PJSM. RIG UP TO TEST BOPE. -VERIFY NO PRESSURE AND OPEN BLIND/SHEAR RAMS. -RIG UP ALL FLOOR VALVES,CROSSOVERS, AND BOPE TEST EQUIPMENT. 09:00 - 14:00 5.00 BOPSUR C DECOMP PJSM ON TESTING BOPE,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES.PRESSURE TEST 13-5/8"5M BOPE,AS PER DDI SOP. -FILL STACK AND CHOKE MANIFOLD TO MGS. **WELL KILL DRILL.** *8 BBLS TO FILL GAS BUSTER. -SHELL TEST BOPE WITH ANNULAR PREVENTER SHUT ON 4"TEST JT,TO 250/ 3,500 PSI. TEST PASS. PRESSURE TEST BOPE WITH 4",4-1/2"AND 19-5/8"TEST JTS TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -PRESSURE TEST ANNULAR PREVENTER WITH 4"TEST JT TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -PERFORM ACCUMULATOR DRAW DOWN TEST. TEST PASS. *LOU GRIMALDI WITH AOGCC,WITNESS BOPE TESTING. FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=40 PSI 14:00 - 15:00 1.00 BOPSUR C DECOMP PJSM. RIG DOWN BOPE TEST EQUIPMENT. -R/D BOPE TEST ASSEMBLY AND EQUIPMENT. -BLOW DOWN CHOKE MANIFOLD AND LINES. -RETRIEVE TEST PLUG. -INSTALL WEAR BUSHING. *ID=9" 15:00 - 16:00 1.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. MAKE UP 8-1/4" MULTI-STRING CUTTER BHA#3. -MOBILIZE 8-1/4"MULTI-STRING CUTTER BHA TO RIG FLOOR. -P/U,M/U AND RIH WITH 8-1/4"MULTI-STRING CUTTER BHA T/11'. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 17 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.4ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 TIEBAC C OTHCMP RUN IN HOLE WITH 8-1/4"MULTI-STRING CUTTER BHA#3. -RIH WITH 8-1/4"MULTI-STRING CUTTER BHA F/11'T/3,344'. -ESTABLISH PARAMETERS. PUW=88K, SOW=86K, RTW=88K,RPM=70 WITH 3-5K FREE TORQUE 18:00 - 20:00 2.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. CUT 9-5/8"CASING AT 3,365'. -LOCATE COLLAR WITH KNIVES AT 3,389'. PUH 25'F/3,389'T/3,365'. 1-SET KNIVES AND CUT 9-5/8"CSG AT 3,365'. I"RPM=70 WITH 3-7K TORQUE, PUMP RATE= 14-5 BPM WITH 500-600 PSI 1"PHASE 2 WEATHER CONDITIONS IN GPB." 20:00 - 20:30 0.50 TIEBAC C ' OTHCMP 1 PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 8-1/4"MULTI-STRING CUTTER BHA#3. 1-POOH WITH 8-1/4"MULTI-STRING CUTTER BHA F/3,365'T/2,475'. MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -ESTABLISH PARAMETERS. PUW=77K, SOW=77K, RTW=77K,RPM=70 WITH 3-5K FREE TORQUE 20:30 - 22:00 1.50 TIEBAC C OTHCMP PJSM WITH BAKER REP. CUT 9-5/8"CASING AT 2,463'. 1-LOCATE COLLAR WITH KNIVES AT 2,488'. -PUH 25'F/2,488'T/2,463'. -SET KNIVES AND CUT 9-5/8"CSG AT 2,463'. RPM=70 WITH 3-7K TORQUE, PUMP RATE= 4-5 BPM WITH 500-600 PSI 22:00 - 23:00 1.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 8-1/4"MULTI-STRING CUTTER BHA#3. -10 MIN FLOW CHECK. WELL STABLE. POOH WITH 8-1/4"MULTI-STRING CUTTER BHA F/2,463'T/BHA. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. 23:00 - 00:00 1.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. LAY DOWN 8-1/4" MULTI-STRING CUTTER BHA#3. I-L/D 8-1/4"MULTI-STRING CUTTER BHA. •KNIVES INDICATE GOOD CUT. -CLEAN AND CLEAR RIG FLOOR. "FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS `AVERAGE LOSS RATE LAST 12 HRS=0 BPH 'OA PRESSURE AT 12:00 HRS=0 PSI "PHASE 2 WEATHER CONDITIONS IN GPB." Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 18 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UW:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/31/2014 00:00 - 01:00 1.00 TIEBAC C OTHCMP RETRIEVE WEAR BUSHING AND SERVICE RIG. -R/U AND RETRIEVE WEAR BUSHING. SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. CROWN-O-MATIC AND SPCC CHECKS- GOOD. "PHASE 2 WEATHER CONDITIONS IN GPB.** 01:00 - 03:00 2.00 TIEBAC C OTHCMP PJSM. RIG UP TO PULL AND LAY DOWN 9-5/8" CASING. -MOBILIZE POWER TONGS AND 9-5/8" HANDLING EQUIPMENT TO RIG FLOOR. -R/U POWER TONGS AND 9-5/8"HANDLING EQUIPMENT. 03:00 - 03:30 0.50 TIEBAC C OTHCMP PJSM WITH BAKER REP. MAKE UP 8-1/4" ITCO SPEAR BHA#4. -P/U,M/U AND RIH WITH 8-1/4"ITCO SPEAR BHA T/13'. 03:30 - 06:00 2.50 TIEBAC C OTHCMP PJSM WITH BAKER AND FMC REPS. PULL 9-5/8"CASING HANGER FREE TO RIG FLOOR. ENGAGE SPEAR INTO 9-5/8"CSG. -M/U X-OVER FOR WELL CONTROL. -FMC REPS,VERIFY NO PRESSURE ON OA AND BOLDS. -PULL 9-5/8"HANGER FREE WITH 20K OVER PULL.(165K ON WT INDICATOR) PUW=140K -RELEASE SPEAR AND UD SPEAR BHA. -L/D MANDREL CSG HANGER. 06:00 - 12:00 6.00 TIEBAC C OTHCMP PJSM. PULL OUT OF HOLE,LAYING DOWN 9-5/8"47#NT-80S NS-CC CASING FROM CUT AT 2,463'. -POOH,LAYING DOWN 9-5/8"CSG F/CUT AT 2,463'T/263'. FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS `AVERAGE LOSS RATE LAST 12 FIRS=0 BPH *OA PRESSURE AT 12:00 HRS=0 PSI 12:00 - 12:30 0.50 TIEBAC C OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. "PHASE 2 WEATHER CONDITIONS IN GPB." 12:30 - 13:00 0.50 TIEBAC C OTHCMP PJSM. PULL OUT OF HOLE,LAYING DOWN 9-5/8"47#NT-80S NS-CC CASING. -POOH,LAYING DOWN 9-5/8"CSG F/263'T/ SURFACE. `TOTAL RECOVERED: 59 JTS OF 9-5/8"CSG AND 1-CUT JT OF 9-5/8"CSG 18.54'LONG. 13:00 - 14:30 1.50 TIEBAC C OTHCMP PJSM. RIG DOWN 9-5/8"CASING EQUIPMENT. -R/D POWER TONGS AND 9-5/8"HANDLING EQUIPMENT. -CLEAN AND CLEAR RIG FLOOR. Printed 1/26/2015 1:41:51PM • North America-ALASKA-BP Page 19 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:30 1.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. MAKE UP 8-1/4" ITCO SPEAR BHA#5. -P/U,M/U AND RIH WITH 8-1/4"ITCO SPEAR BHA T/227. 15:30 - 18:00 • 2.50 TIEBAC C OTHCMP PJSM WITH BAKER REP. RUN IN HOLE 8.1/4" ITCO SPEAR BHA#5. -RIH WITH 8-1/4"ITCO SPEAR BHA,ON 4"DP FROM DERRICK F/227 T/2,404'. Printed 1/26/2015 1:41:51 PM North America-ALASKA-BP Page 20 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 TIEBAC X DPRB OTHCMP PJSM WITH BAKER REP. ENGAGE SPEAR AND ATTEMPT TO JAR/PULL 9-5/8"CSG FREE FROM CUT AT 3,365'. -ESTABLISH PARAMETERS. PUW=89K, SOW=81K -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. 3 BPM WITH 60 PSI,4 BPM WITH 100 PSI -RIH WITH 8-1/4"ITCO SPEAR BHAAND ENGAGE 9-5/8"CSG STUB AT 2,464'WITH 10K DOWN. *BULLNOSE AT 2,475'. -CONDUCT PRE-JARRING DERRICK INSPECTION,AS PER DDI SOP.-PASS. *STRING WT+WT OF 9-5/8"CSG FISH=120K -ATTEMPT TO JAR 9-5/8"CSG FREE,FIRING JARS F/175K-250KAND OVER PULLING F/ 55K-155K(WT INDICATOR=225K-275K) -NO SUCCESS. FIRE JARS 5 TIMES -CONDUCT DERRICK INSPECTION.-PASS. -ATTEMPT TO JAR 9-5/8"CSG FREE,CIRC AT 5 BPM WITH 170 PSI,FIRING JARS AT 250K AND OVER PULLING F/155K-180K(WT INDICATOR=275K-300K) -NO SUCCESS. FIRE JARS 5 TIMES -CONTINUE TO CIRC,WHILE CONDUCT DERRICK INSPECTION.-PASS. -ATTEMPT TO JAR 9-5/8"CSG FREE,CIRC AT B BPM WITH 450 PSI,FIRING JARS AT 275K AND OVER PULLING F/180K-230K(WT INDICATOR=300K-350K) -NO SUCCESS. •FIRE JARS 5 TIMES -CONTINUE TO CIRC CONDUCT DERRICK INSPECTION.-PASS. 'OBSERVED FINE CEMENT MIXED WITH DEAD CRUDE COME ACROSS THE SHAKERS. -DISCUSS PLAN FORWARD WITH ODE. -ATTEMPT TO JAR 9-5/8"CSG FREE,CIRC AT B BPM WITH 450 PSI,FIRING JARS AT 285K AND OVER PULLING 230K(WT INDICATOR= 350K) -NO SUCCESS. FIRE JARS 5 TIMES -CONTINUE TO CIRC CONDUCT DERRICK INSPECTION.-PASS. -ATTEMPT TO JAR 9-5/8"CSG FREE,CIRC AT 8 BPM WITH 450 PSI,FIRING JARS AT 285K AND OVER PULLING 230K(WT INDICATOR= 350K) -NO SUCCESS. 'FIRE JARS 5 TIMES -CONTINUE TO CIRC CONDUCT DERRICK INSPECTION.-PASS. -RELEASE 8-1/4"ITCO SPEAR F/9-5/8"CSG, AS PER BAKER REP. -BLOW DOWN TOP DRIVE. FLUID LOSS FROM 12:00 HRS-00:00 HRS= 0 BBLS Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 21 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 1 (hr) (usft) *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 00:00 HRS=0 PSI "PHASE 2 WEATHER CONDITIONS IN GPB.** 1/1/2015 00:00 - 01:00 1.00 I TIEBAC C OTHCMP !SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. '-CLEAN AND CLEAR RIG FLOOR. 01:00 - 02:00 1.00 TIEBAC C OTHCMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 8-1/4"ITCO SPEAR BHA#5. -POOH WITH 8-1/4"ITCO SPEAR BHA, STANDING BACK 4"DP IN DERRICK F/2,464' T/270'. 02:00 - 03:30 1.50 TIEBAC C OTHCMP PJSM WITH BAKER REP. LAY DOWN 8-1/4" ITCO SPEAR BHA#5. -10 MIN FLOW CHECK BEFORE PULLING NON-SHEARABLES THRU THE BOP STACK WELL STABLE. -POOH AND UD 8-1/4"ITCO SPEAR BHA F/ .270'T/SURFACE. CLEAN AND CLEAR RIG FLOOR. 03:30 - 07:30 4.00 BOPSUR P OTHCMP PJSM. CHANGE UPPER PIPE RAMS FROM 9-5/8"SOLID BODY RAMS TO 7"SOLID BODY RAMS. -R/U AND RETRIEVE WEAR BUSHING. -INSTALL TEST PLUG. -CLOSE BLIND/SHEAR RAMS. -PRESSURE TEST BLIND/SHEAR RAMS AND TEST PLUG TO 250/3,500 PSI FOR 5 CHARTED MIN EACH.TEST PASS. -VOID BOP STACK OF FLUID. -CHANGE UPPER PIPE RAMS F/9-5/8"SOLID BODY RAMS T/7"SOLID BODY RAMS. `BARRIERS IN PLACE:TESTED 9-5/8"RBP'sAT 10,947'AND 3,449',TEST PLUG,CLOSED AND TESTED BLIND/SHEAR RAMS. 07:30 - 11:00 3.50 BOPSUR P OTHCMP PJSM ON TESTING BOPE,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES.PRESSURE TEST 7"UPPER PIPE RAMS,AS PER DDI SOP. -R/U TEST EQUIPMENT AND 7"TEST ASSEMBLY. -PURGE LINES. -PRESSURE TEST UPPER PIPE RAMS, DRESSED WITH 7"SOLID BODY RAMS TO 250 /3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -R/D TEST EQUIPMENT AND 7"TEST ASSEMBLY. -BLOW DOWN LINES AND VOID BOP STACK OF FLUID. INSPECT MGS AND CHECK STEAM LINE FOR VENT PIPE. -R/U AND RETRIEVE TEST PLUG. -INSTALL WEAR BUSHING. *WEAR BUSHING ID=12-3/8" Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 22 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 DHB P OTHCMP PJSM WITH HES REP. MAKE UP AND RUN IN HOLE WITH 9-5/8"RBP RETRIEVAL TOOL. -P/U,M/U AND RIH WITH 9-5/8"RBP RETRIEVAL TOOL T/1,626'. 12:00 - 12:30 0.50 DHB P OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 12:00 HRS=0 PSI 12:30 - 14:00 1.50 DHB N DPRB OTHCMP PJSM WITH HES REP. RUN IN HOLE WITH 9-5/8"RBP RETRIEVAL TOOL. -RIH WITH 9-5/8"RBP RETRIEVAL TOOL F/ ,1,626'AND TAG 9-5/8"CSG STUB AT 2,463'. -ESTABLISH PARAMETERS,NO PUMP OPERATION *PUW=74K, SOW=75K -MADE SEVERAL ATTEMPTS TO WORK 9-5/8" RBP RETRIEVAL TOOL PAST 9-5/8"CSG STUB, WITH NO SUCCESS. 14:00 - 15:30 1.50 DHB N DPRB OTHCMP PJSM WITH HES REP. PULL OUT OF HOLE WITH 9-5/8"RBP RETRIEVAL TOOL. -10 MIN FLOW CHECK. WELL STABLE. -POOH WITH 9-5/8"RBP RETRIEVAL TOOL F/ 2,463'T/SURFACE. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -CHANGE 9-5/8"RBP RETRIEVAL TOOL TO 9-5/8"RBP MULE SHOE RETRIEVAL TOOL. 15:30 - 18:00 2.50 DHB P OTHCMP PJSM WITH HES REP. RUN IN HOLE WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL. -RIH WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL T/2,450'. -ESTABLISH PARAMETERS,NO PUMP OPERATION *PUW=76K, SOW=75K, -RIH WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL F/2,450'AND TAG 9-5/8" CSG STUB AT 2,463'. -WORK 9-5/8"RBP MULE SHOE RETRIEVAL TOOL PAST 9-5/8"CSG STUB AT 2,463'AND TAG TOP OF SAND AT 3,384'. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 23 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 DHB P OTHCMP PJSM WITH HES REP. WASH,CLEAN AND CLEAR SAND FROM ON TOP OF 9-5/8"RBP. ESTABLISH PARAMETERS. *PUW=88K, SOW=88K, PUMP RATE=8.5 • BPM WITH 400 PSI -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *3 BPM WITH 90 PSI,4 BPM WITH 110 PSI -PUMP 20 BBL HI-VIS SWEEP AT 6 BPM WITH 240 PSI. WASH,CLEAN AND CLEAR SAND FROM ON • TOP OF 9-5/8"RBP F/3,384'AND TAG 9-5/8" • RBP AT 3,449'W/15K DOWN. *PUMP RATE=8.5 BPM WITH 400 PSI. -PUMP 20 BBL HI-VIS SWEEP AROUND AT 8.5 BPM WITH 420 PSI. 20:00 - 21:30 1.50 DHB P OTHCMP RETRIEVE 9-5/8"RBP AT 3,449'. • -ATTEMPT TO LATCH 9-5/8"RBP SEVERAL TIMES,WITH NO SUCCESS. *SET DOWN 15K-30K • *INDICATIONS OF SAND/DEBRIS PREVENTING RETRIEVAL TOOL TO LATCH. PUH AND WASH DOWN,LATCH AND •RETRIEVE 9-5/8"RBP AT 3,449'. •TOOK SEVERAL ATTEMPTS WASHING DOWN AT 8.5 BPM WITH 420 PSI. 21:30 - 00:00 2.50 DHB P OTHCMP PJSM WITH HES REP. PULL OUT OF HOLE AND LAY DOWN 9-5/8"RBP. -10 MIN FLOW CHECK WHILE ALLOW 9-5/8" RBP ELEMENTS TO RELAX. WELL STABLE. -POOH AND UD 9-5/8"RBP F/3,449'T/ SURFACE. *MONITOR TRIP ON TRIP TANK-CORRECT • HOLE FILL OBSERVED. '30K-60K OVER PULLS FOR FIRST(3)STDS, INDICATING SAND/DEBRIS PREVENTING RBP SLIPS FROM RETRACTING. *2K OVER PULL WITH 9-5/8"RBP PASSING THRU 9-5/8"CSG STUB AT 2,463'. -INSPECT 9-5/8"RBP. *OBSERVED RBP ELEMENT PARTIALLY ROLLED.RECOVERED:(2)SMALL PIECES CEMENT DEBRIS AND SAND IN CIRCULATING • PORTS/SLIPS OF RBP. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH *OA PRESSURE AT 00:00 HRS=0 PSI Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 24 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/2/2015 00:00 - 04:30 4.50 DHB P OTHCMP PJSM WITH HES REP. RUN IN HOLE WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL. -RIH WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL T/2,450'. ESTABLISH PARAMETERS,NO PUMP OPERATION *PUW=76K, SOW=75K -RIH WITH 9-5/8"RBP MULE SHOE RETRIEVAL TOOL F/2,450'AND TAG 9-5/8" CSG STUB AT 2,463'. WORK 9-5/8"RBP MULE SHOE RETRIEVAL TOOL PAST 9-5/8"CSG STUB AT 2,463'T/ 10,939' 04:30 - 05:30 1.00 DHB P OTHCMP PJSM WITH HES REP. RETRIEVE 9-5/8"RBP AT 10,942'. -ESTABLISH PARAMETERS. *PUW=190K, SOW=131K -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *3 BPM WITH 160 PSI -WASH DOWN F/10,939'AND LATCH 9-5/8" RBP AT 10,942'. *SET DOWN 20K -RETRIEVE 9-5/8"RBP AT 10,942'. 35K OVER PULL TO RELEASE RBP -RIH WITH 9-5/8"RBP,PAST SETTING DEPTH TO 10,947'. 05:30 - 07:00 1.50 DHB P OTHCMP BULLHEAD 30 BBLS OF 8.5 PPG SEAWATER. -CLOSE ANNULAR PREVENTER. -BULLHEAD 30 BBLS OF 8.5 PPG SEAWATER AT 8 BPM WITH 800 PSI. *ICP=800 PSI, FCP=2,230 PSI -MONITOR WELL. -VERIFY NO PRESSURE AND OPEN ANNULAR PREVENTER. -POOH WITH 9-5/8"RBP F/10,947'T/10,850'. *WELL ON VACUUM. ESTABLISH LOSS RATE AT 30 BPH. 07:00 - 10:30 3.50 DHB P OTHCMP PJSM. PULL OUT OF HOLE WITH 9-5/8"RBP. -POOH WITH 9-5/8"RBP F/10,850'T/6,080'. MONITOR TRIP ON TRIP TANK-LOSS RATE FLUCTUATION OBSERVED. 10 MIN FLOW CHECK. 10:30 - 13:30 3.00 DHB P OTHCMP CIRCULATE BOTTOMS UP THROUGH MUD GAS SEPARATOR. -M/U TOP DRIVE. -CLOSE ANNULAR PREVENTER. -CIRC B/U THRU MGS AT 6 BPM WITH 390 PSI. ICP=390 PSI, FCP=340 PSI LOSS 30 BBLS OF 8.5 PPG SEAWATER DURING B/U CIRC -BULLHEAD 25 BBLS OF 8.5 PPG SEAWATER AT 2 BPM WITH 870 PSI. -VERIFY NO PRESSURE AND OPEN ANNULAR PREVENTER. -10 MIN FLOW CHECK. WELL ON VACUUM. *CONTINUOUSLY MONITOR WELLAND KEEP HOLE FULL AT 6 BPH. -BLOW DOWN CHOKE AND CIRC LINES. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 25 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 13:30 - 18:30 5.00 DHB P OTHCMP PJSM WITH HES AND BAKER REPS. PULL OUT OF HOLE AND LAY DOWN 9-5/8"RBP. -POOH AND L/D 9-5/8"RBP F/6,080'. -CLEAN AND CLEAR RIG FLOOR. MOBILIZE 9-5/8"DRESS-OFF BHA#6 COMPONENTS TO RIG FLOOR. 18:30 - 20:00 1.50 CLEAN P OTHCMP PJSM WITH BAKER REP. MAKE UP 9-5/8" DRESS-OFF BHA#6. -P/U,M/U AND RIH WITH 9-5/8"DRESS-OFF BHA T/232'. 20:00 - 21:30 1.50 CLEAN P OTHCMP RUN IN HOLE WITH 9-5/8"DRESS-OFF BHA#6. -RIH WITH 9-5/8"DRESS-OFF BHA,ON 4"DP FROM DERRICK F/232'T/2,400' -ESTABLISH PARAMETERS. *PUW=89K, SOW=89K, RTW=89K, RPM= 70 WITH 2-3K FREE TORQUE, PUMP RATE=5 BPM WITH 120 PSI. -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. '3 BPM WITH 60 PSI, 4 BPM WITH 90 PSI 21:30 - 22:00 0.50 CLEAN P OTHCMP PJSM WITH BAKER REP. DRESS-OFF 9-5/8" CSG STUB. -RIH WITH 9-5/8"DRESS-OFF BHA F/2,400' AND TAG TOP OF 9-5/8"STUB AT 2,463'. -DRESS-OFF 9-5/8"CSG STUB F/2,463'T/ 2,464'. *RPM=70 WITH 3-4K TORQUE, WOM=2-3K PUMP RATE=5 BPM WITH 120 PSI. -SHUT DOWN PUMP AND ROTATION AND WORK THROUGH 9-5/8"CSG STUB. NO ISSUES. *NEW TOP OF 9-5/8"CSG STUB AT 2,464'. 22:00 - 23:00 1.00 CLEAN P OTHCMP CIRCULATE HI-VIS SWEEP AROUND. -PUH F/2,464'T/2,405'. -PUMP 20 BBL HI-VIS SWEEP AROUND AT 8 BPM WITH 90 PSI. -10 MIN FLOW CHECK. WELL ON VACUUM. •CONTINUOUSLY MONITOR WELLAND KEEP HOLE FULL AT 6 BPH. 23:00 - 00:00 1.00 CLEAN P OTHCMP PJSM AND REVIEW OF DDI SOP FOR SLIP AND CUT DRILL LINE. PREPARE TO SLIP AND CUT DRILLING LINE. -HANG BLOCKS. -VOID RIG FLOOR SUMP OF FLUID. -CLEAN CLEAR AND PREP RIG FLOOR TO SLIP AND CUT DRILL LINE. *CONTINUOUSLY MONITOR WELLAND KEEP WELLBORE FULL AT t6 BPH. •FLUID LOSS FROM 00:00 HRS-12:00 HRS= 55 BBLS *AVERAGE LOSS RATE LAST 12 HRS=5 BPH 'OA PRESSURE AT 12:00 HRS=0 PSI 1/3/2015 00:00 - 01:30 1.50 CLEAN P OTHCMP PJSM AND REVIEW OF DDI SOP FOR SLIP AND CUT DRILL LINE. SLIP AND CUT DRILLING LINE. -SLIP AND CUT 60'OF DRILL LINE. 'INSPECT BRAKES AND FUNCTION TEST CROWN-O-MATIC.TEST PASS. ,-------••--•Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 26 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:00 2.50 CLEAN P OTHCMP PJSM WITH BAKER REP. PULL OUT OF HOLE AND LAY DOWN 9-5/8"DRESS-OFF BHA#6. -POOH WITH 9-5/8"DRESS-OFF BHA F/2,405' T/232'. !*MONITOR TRIP ON TRIP TANK-CORRECT j HOLE FILL OBSERVED. -10 MIN FLOW CHECK FOR j NON-SHEARABLES ACROSS BOP STACK WELL ON VACUUM. CONTINUOUSLY MONITOR WELLAND KEEP HOLE FULL AT 6 BPH. -POOH AND L/D 9-5/8"DRESS-OFF BHA F/ 232'. CLEAN STRING MAGNETS. RECOVERED:7 LBS OF METAL SHAVINGS. -CLEAN AND CLEAR RIG FLOOR. 04:00 - 06:00 2.00 CLEAN P OTHCMP PJSM WITH BAKER REP. MAKE UP 4-1/2" DRESS-OFF BHA#7. -P/U,M/U AND RIH WITH 4-1/2"DRESS-OFF BHA T/246'. 06:00 - 12:00 6.00 CLEAN P OTHCMP PJSM WITH BAKER REP. RUN IN HOLE WITH 4-1/2"DRESS-OFF BHA#7. -RIH WITH 4-1/2"DRESS-OFF BHA,ON 4"DP FROM DERRICK F/246'T/2,426'. -ESTABLISH PARAMETERS. *PUW=89K, SOW=89K, RTW=89K,RPM=20 WITH 2K FREE TORQUE -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *2 BPM WITH 10 PSI, 3 BPM WITH 20 PSI -RIH WITH 4-1/2"DRESS-OFF BHA F/2,426' AND TAG TOP OF 9-5/8"CSG STUB AT 2,464' WITH 2K DOWN. -WORK 4-1/2"DRESS-OFF SHOE PAST 9-5/8" CSG STUB AT 2,464'. (2)RIGHT HAND TURNS,(1)1/2 LEFT HAND TURN AND 4-1/2"DRESS-OFF SHOE WENT IN 9-5/8"CSG. RIH WITH 4-1/2"DRESS-OFF BHA F/2,464'T/ 8,775'. *PUW=180K, SOW=126K *CONTINUOUSLY MONITOR WELL AND KEEP WELLBORE FULL AT±3 BPH. *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 25 BBLS *AVERAGE LOSS RATE LAST 12 HRS=2 BPH `OA PRESSURE AT 12:00 HRS=0 PSI 12:00 - 12:30 0.50 CLEAN P OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 27 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 14:00 1.50 CLEAN P OTHCMP PJSM WITH BAKER REP. RUN IN HOLE WITH 4-1/2"DRESS-OFF BHA#7. -RIH WITH 4-1/2"DRESS-OFF BHA,ON 4"DP FROM DERRICK F/8,775'T/11,113'. -ESTABLISH PARAMETERS. *PUW=210K, SOW=134K, RTW=167K, RPM=60 WITH 7-8K FREE TORQUE, PUMP RATE=5 BPM WITH 380 PSI 14,00 - 15:00 1.00 CLEAN P OTHCMP PJSM WITH BAKER REP. DRESS-OFF 4-1/2" TBG STUB. -RIH WITH 4-1/2"DRESS-OFF BHA F/11,113' AND TAG TOP OF 4-1/2"TBG STUB AT 11,148'. -DRESS-OFF 4-1/2"TBG STUB,AS PER BAKER REP F/11,148'T/11,163' *RPM=60, WOB=2-3K WITH 7-9K TORQUE, PUMP RATE=5 BPM WITH 380 PSI *TOP OF TBG STUB AT 11,148'. -ENSURE 4-1/2"TBG STUB DRESSED CLEAN, BY WORKING DRESS-OFF SHOE OVER TBG STUB WITH NO PUMP OR ROTATION. NO ISSUES. 15:00 - 17'30 2.50 CLEAN P OTHCMP CIRCULATE HI-VIS SWEEP AROUND. -PUH TO 11,145'. ESTABLISH PARAMETERS. 'PUW=210K, SOW=134K -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *3 BPM WITH 160 PSI, 4 BPM WITH 250 PSI -PUMP 40 BBL HI-VIS SWEEP AROUND AT 8 BPM WITH 880 PSI. -10 MIN FLOW CHECK. WELL ON VACUUM. *CONTINUOUSLY MONITOR WELLAND KEEP WELLBORE FULL AT±5 BPH. 17:30 - 22:30 5.00 CLEAN P OTHCMP PJSM WITH BAKER REP. PULL OUT OF HOLE WITH 4-1/2"DRESS-OFF BHA#7. -POOH WITH 4-1/2"DRESS-OFF BHA F/ 11,145'T/246' MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -10 MIN FLOW CHECK BEFORE PULLING NON-SHEARABLES THRU BOP STACK WELL ON VACUUM. *CONTINUOUSLY MONITOR WELLAND KEEP WELLBORE FULLAT±5 BPH. 22:30 - 00:00 1.50 CLEAN P OTHCMP PJSM WITH BAKER REP. LAY DOWN 4-1/2" DRESS-OFF BHA#7. -POOH AND UD 4-1/2"DRESS-OFF BHA F/ 246'. FLUID LOSS FROM 12:00 HRS-00:00 HRS= 50 BBLS *AVERAGE LOSS RATE LAST 12 HRS=4 BPH *OA PRESSURE AT 12:00 HRS=0 PSI 1/4/2015 00:00 - 00:30 0.50 CLEAN P OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATICAND SPCC CHECKS- GOOD. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 28 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UW:500292248400 Active datum:Kelly Bushing/Rotary Table @62.4ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:00 1.50 CLEAN P OTHCMP PJSM WITH BAKER REP. LAY DOWN 4-1/2" DRESS-OFF BHA#7. -POOH AND L/D 4-1/2"DRESS-OFF BHA F/ 246'. -CLEAN AND INSPECT WASHOVER BOOT BASKET AND STRING MAGNETS. RECOVERED:1-LARGE PIECE OF CSG 5-1/2"LONG x 3"WIDE x.10"THICK)AND±17 LBS OF METAL SHAVINGS FROM STRING MAGNET,±10 LBS OF SMALL PIECES OF CSG AND METAL SHAVINGS FROM WASHOVER BOOT BASKET. WEAR ON DRESS-OFF SHOE INDICATES CLEAN 4-1/2"TBG STUB. CONTINUOUSLY MONITOR WELLAND KEEP HOLE FULL AT±5 BPH. 02:00 - 03:30 1.50 TIEBAC P OTHCMP PJSM WITH BAKER AND DOYON CASING REPS. RIG UP TO RUN 7"SCAB LINER. CLEAN AND CLEAR RIG FLOOR. -MOBILIZE POWER TONGS AND 7"HANDLING 'EQUIPMENT TO RIG FLOOR. -R/U POWER TONGS AND 7"HANDLING EQUIPMENT. 03:30 - 06:30 3.00 TIEBAC P OTHCMP PJSM WITH BAKER AND DOYON CASING REPS. MAKE UP 7"26#L-80 VAMTOP HC SCAB LINER ASSEMBLY AND SET 7"WLSRBP. -P/U,M/U AND RIH WITH 9-5/8"x 4-1/2" UNIQUE MACHINE OVERSHOT ASSY,4-1/2"x 7"X-OVER PUP JT AND 1-JT OF 7"26#L-80 VAMTOP HC. -P/U,M/U AND RIH WITH 7"WLSRBP ON 2- JTS OF 4"DP TO 50'BELOW 7"CSG COLLAR. -DROP 7"WLSRBP SETTING BALL. -R/U LINES AND EQUIPMENT TO SET 7" WLSRBP. -PRESSURE UP ON DP TO 3,800 PSI AND OBSERVED 7"WLSRBP SET. -POOH AND L/D 7"WLSRBP SETTING TOOL. 06:30 - 07:00 0.50 TIEBAC P OTHCMP PJSM WITH BAKER DOYON CASING REPS. RIG UP AND ATTEMPT TO TEST 7"WLSRBP. -R/U AND PURGE LINES AND TEST EQUIPMENT. '-ATTEMPT TO FILL 7"CSG WITH FLUID AND OBSERVED FLUID LEAKING BY 7"WLSRBP, INDICATING 7"WLSRBP DID NOT SET PROPERLY. 07:00 - 08:00 1.00 TIEBAC N DFAL OTHCMP PJSM WITH BAKER DOYON CASING REPS. BREAK DOWN AND LAY DOWN 7"SCAB LINER ASSEMBLY. -STEAM,BREAK OUT AND L/D 1-JT OF 7"26# L-80 VAMTOP HC,4-1/2"x 7"X-OVER PUP JT AND 9-5/8"x 4-1/2"UNIQUE MACHINE OVERSHOT ASSY. STEAM,CLEAN AND INSPECT BAKER LOK'ED CONNECTIONS.-CONNECTIONS OK. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 29 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 4.00 TIEBAC N WSEQ OTHCMP WAIT ON 4-1/2"x 7"X-OVER PUP JT ASSEMBLY AND NEW 7"WLSRBP ASSEMBLY. -RIG ON STAND-BY WITH FULL CREWS, WHILE WAITING ON 4-1/2"x 7"X-OVER PUP JT ASSY AND NEW 7"WLSRBP ASSY. -RIG CREWS WORKING ON DDI MP2's, HOUSEKEEPING AND GENERAL RIG MAINTENANCE. "FIRE DRILL FOLLOWED BY AAR." 'CONTINUOUSLY MONITOR WELL AND KEEP 1 WELLBORE FULLAT±3 BPH. FLUID LOSS FROM 00:00 HRS-12:00 HRS= 36 BBLS 'AVERAGE LOSS RATE LAST 12 HRS=3 BPH 'OA PRESSURE AT 12:00 HRS=0 PSI 12:00 - 13:30 1.50 TIEBAC N WSEQ OTHCMP PJSM WITH BAKER AND DOYON CASING REPS. MAKE UP 7"26#L-80 VAMTOP HC SCAB LINER ASSEMBLY AND SET 7"WLSRBP. -P/U,M/U AND RIH WITH NEW 9-5/8"x 4-1/2" UNIQUE MACHINE OVERSHOT ASSY,NEW 4-1/2"x 7"X-OVER PUP JT AND 1-JT OF 7"26# L-80 VAMTOP HC. -P/U,M/U AND RIH WITH 7"WLSRBP ON 1- JTS OF 4"DP AND 15'LONG 4"DP PUP JT,TO 50'BELOW 7"CSG COLLAR. -DROP 7"WLSRBP SETTING BALL. -M/U TOP DRIVE. -R/U TO SET 7"WLSRBP. -SET 7"WLSRBP,AS PER BAKER REP. *PRESSURE UP ON DP TO 3,800 PSI AND OBSERVED 7"WLSRBP SET. -POOH AND L/D 7"WLSRBP SETTING TOOL. *ALL CONNECTIONS BAKER LOK'ED. 'VAMTOP HC CONNECTIONS TORQUE= 11,950 FT/LBS 13:30 - 15:00 1.50 TIEBAC N WSEQ OTHCMP PJSM WITH BAKER DOYON CASING REPS. RIG UP AND TEST 7"WLSRBP. -R/U AND PURGE LINES AND TEST EQUIPMENT. -PRESSURE TEST 7"WLSRBP TO 250/3,000 PSI FOR 5 CHARTED MINS EACH.-TEST PASS. -R/D LINES AND TEST EQUIPMENT. 15:00 18:00 3.00 TIEBAC P OTHCMP PJSM WITH BAKER AND DOYON CASING REPS. PLACE 35'OF SAND ON TOP OF 7" WLSRBP AND MAKE UP 9-5/8"x 7"BAKER FLEXLOCK IV LINER HANGER/"HRD-E"ZXPN LINER TOP PACKER ASSEMBLY. -PLACE 35'/15 SKS/750 LBS OF 20/40 RIVER SAND ON TOP OF 7"WLSRBP. -P/U AND M/U 9-5/8"x 7"BAKER FLEXLOCK IV LINER HANGER/"HRD-E"ZXPN LINER TOP PACKER ASSY. 'BOTTOM CONNECTION OF LINER HANGER/ TOP PACKER ASSY,BAKER LOK'ED. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 30 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 TIEBAC P OTHCMP PJSM WITH BAKER REP. RUN 7"SCAB LINER ASSEMBLY ON 4"DRILL PIPE. -RIH WITH 7"SCAB LNR ASSY,FILLING DP EVERY 10-STDS,AT 60 FT/MIN F/121'T/ 2,400'. -ESTABLISH PARAMETERS. *PUW=76K, SOW=75K *NO SPR's DUE TO 7"WLSRBP SET IN 7" SCAB LINER. -RIH WITH 7"SCAB LNR ASSY,AT 60 FT/MIN F/2,400'AND TAG TOP OF 9-5/8"CSG STUB AT 2,464'WITH 2K DOWN. -WORK 7"SCAB LINER ASSY INTO 9-5/8"CSG WITH 3/4 OFA TURN TO THE RIGHT. -RIH WITH 7"SCAB LNR ASSY,FILLING DP EVERY 10-STDS,AT 60 FT/MIN F/2,464'T/ 6,769'. *PUW=136K, SOW=112K *CONTINUOUSLY MONITOR WELLAND KEEP HOLE FULL AT±3 BPH. *FLUID LOSS FROM 12:00 HRS-00:00 HRS= 25 BBLS *AVERAGE LOSS RATE LAST 12 HRS=2 BPH *OA PRESSURE AT 12:00 HRS=0 PSI 1/5/2015 00:00 - 00:30 0.50 TIEBAC P ' OTHCMP SERVICE RIG. 1 -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 00:30 04:30 4.00 TIEBAC P OTHCMP PJSM WITH BAKER REP. RUN 7"SCAB LINER ASSEMBLY ON 4"DRILL PIPE. -RIH WITH 7"SCAB LNR ASSY,FILLING DP EVERY 10-STDS,AT 60 FT/MIN F/6,769'T/ 11,100'. -ESTABLISH PARAMETERS. *PUW=200K, SOW=131K *NO PUMP OPERATIONS,DUE TO 7" WLSRBP,SET IN 7"SCAB LINER ASSY. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 31 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 06:00 1.50 TIEBAC P OTHCMP PJSM WITH RIG CREW AND BAKER REP WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. SET 9-5/8"x 7" BAKER FLEXLOCK IV LINER HANGER/ "HRDE"ZXPN LINER TOP PACKER. -RIH WITH 7"SCAB LNR ASSY Fl ENGAGE 4-1/2"STUB AT 11,148'AND NO-GO WITH END OF UNIQUE MACHINE OVERSHOT 'AT 11,163'WITH 20K DOWN. *OBSERVED BOTH SETS OF SHEAR PINS SHEAR WITH 9K. -PUH 1'OFF NO-GO.-END OF UNIQUE MACHINE OVERSHOT AT 11,162'. -SET LINER HANGER AND PACKER,AS PER BAKER REP. -PRESSURE UP ON DP TO 1,800 PSI AND SET DOWN 65K TO SET LINER HANGER. -PRESSURE UP F/1,800 T/3,750 PSI AND OBSERVED PUSHER TOOL NEUTRALIZE. PRESSURE UP F/3,750 PSI T/4,200 PSI AND HELD FOR 2 MINS. '-BLEED PRESSURE TO 0 PSI. P/U TO AND RELEASE RUNNING TOOL. *P/U 4'AND OBSERVED DOG OUT AFTER P/U 4'AT 207K PUW. -SET 65K DOWN ON LINER TOP PACKER TO ENSURE SET. -P/U 5',ROTATE AT 10 RPM WITH 4 K TORQUE AND TAG LINER TOP PACKER WITH 65K DOWN. *TOP OF 9-5/8"x 7"ZXPN LINER TOP PACKER SET AT 11,039'. *BOTTOM OF UM OVERSHOT SET AT 11,067. *7"WLSRBP SET AT 11,115'. *TOP OF SAND AT 11,080'. *SUBMITTED 24 HR NOTICE OF INTENT TO CONDUCT WEEKLY BOPE TEST ON 1/5/15 AT 05:29 HRS. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 32 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 TIEBAC P OTHCMP PJSM WITH RIG CREWAND BAKER REP. PULL OUT OF HOLE WITH 7"SCAB LINER RUNNING TOOL. ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. *2 BPM WITH 40 PSI, 3 BPM WITH 80 PSI -10 MIN FLOW CHECK. WELL ON VACUUM. 1*CONTINUOUSLY MONITOR WELLAND KEEP WELLBORE FULL AT±3 BPH. -PUMP 10 BBL DRY JOB. -BLOW DOWN TOP DRIVE. -L/D 2-SINGLES OF 4"DP. POOH WITH 7"SCAB LINER RUNNING TOOL F/11,039'T/3,046'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. *PUW=85K, SOW=85K *FLUID LOSS FROM 00:00 HRS-12:00 HRS= 46 BELS *AVERAGE LOSS RATE LAST 12 HRS=±4 BPH *OA PRESSURE AT 12:00 HRS=0 PSI 12:00 - 12:30 0.50 TIEBAC P OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 12:30 - 15:30 3.00 TIEBAC P OTHCMP PJSM WITH RIG CREW AND BAKER REP. PULL OUT OF HOLE WITH 7"SCAB LINER RUNNING TOOL. -POOH AND L/D 7"SCAB LINER RUNNING TOOL F/3,046'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. CLEAN AND CLEAR RIG FLOOR OF 7"SCAB LINER RUNNING TOOL AND HANDLING EQUIPMENT. -MOBILIZE 9-5/8"RTTS TO RIG FLOOR. 15:30 - 18:30 3.00 TIEBAC P OTHCMP PJSM WITH RIG CREWAND HES REP. RUN IN HOLE WITH 9-5/8"RTTS. -P/U,M/U AND RIH WITH 9-5/8"RTTS TO 3,800'. -ESTABLISH PARAMETERS. *PUW=95K, SOW=92K -ACQUIRE SLOW PUMP RATES WITH 8.5 PPG SEAWATER. •2 BPM WITH 40 PSI, 3 BPM WITH 80 PSI Printed 1/26/2015 1.41:51PM North America-ALASKA-BP Page 33 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. 1UW:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 19:30 1.00 TIEBAC P OTHCMP PJSM WITH RIG CREWAND BAKER REP WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. SET 9-5/8"RTTS AND PRESSURE TEST 9-5/8"CSG,7"SCAB LINER AND 7"WLSRBP. -SET 9-5/8"RTTS,AS PER BAKER REP AT 3,800'. -PRESSURE TEST 9-5/8"CSG,7"SCAB LINER AND 7"WLSRBP,BELOW 9-5/8"RTTS TO 250/ 3,000 PSI FOR 5 CHARTED MINS EACH.- TEST PASS. UN-SET 9-5/8"RTTS,AS PER HES REP. 19:30 - 21:00 1.50 TIEBAC P OTHCMP PJSM AND REVIEW OF DDI SOP FOR SLIP AND CUT DRILL LINE. SLIP AND CUT I DRILLING LINE. -HANG BLOCKS. -CLEAN CLEAR AND PREP RIG FLOOR TO SLIP AND CUT DRILL LINE. -SLIP AND CUT 60'OF DRILL LINE. '*INSPECT BRAKES AND FUNCTION TEST CROWN-O-MATIC.-TEST PASS. 21:00 - 23:00 2.00 TIEBAC P OTHCMP PJSM WITH RIG CREW AND HES REP. PULL OUT OF HOLE AND LAY DOWN 9-5/8"RTTS. -POOH AND UD 9-5/8"RTTS F/3,800'T/ SURFACE. -CLEAN AND CLEAR RIG FLOOR. 23:00 - 00:00 1.00 WHSUR P OTHCMP PJSM. RETRIEVE WEAR BUSHING AND FLUSH/WASH BOPS. -R/U AND RETRIEVE WEAR BUSHING. -FLUSH/WASH BOPE AS PER DDI SOP. M/U STACK WASHER AND FLUSH/WASH BOPE AND SURFACE LINES. -FUNCTION TEST BOPE COMPONENTS,TO ENSURE CLEAR OF ANY DEBRIS.-FUNCTION TEST PASS. -R/D STACK WASHER. `CONTINUOUSLY MONITOR WELL.-WELL STABLE. FLUID LOSS FROM 12:00 HRS-00:00 HRS= 0 BBLS *AVERAGE LOSS RATE LAST 12 HRS=0 BPH `OA PRESSURE AT 12:00 HRS=0 PSI 1/6/2015 00:00 - 02:00 2.00 BOPSUR P DECOMP PJSM WITH RIG CREW. R/U BOPE LINES AND TESTING EQUIPMENT. -VOID BOP STACK OF FLUID. -R/U AND M/U ALL FLOOR VALVES, CROSSOVERS,AND EQUIPMENT TO TEST BOPE. -R/U 4"TEST ASSY AND INSTALL TEST PLUG. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 34 of 4 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 06:30 4.50 BOPSUR P DECOMP PJSM WITH RIG CREW ON TESTING BOPE, WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES.PRESSURE TEST 13-5/8"5M BOPE. -PRESSURE TEST BOPE AS PER DDI SOP. -PRESSURE TEST BOPE WITH 4",4-1/2"AND 7"TEST JTS TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. -PRESSURE TEST ANNULAR PREVENTER WITH 4"TEST JT TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. -PERFORM ACCUMULATOR DRAW DOWN TEST. *MATT HERRERA WITH AOGCC,WAIVED WITNESS ON 1/5/2015 AT 16:30 HRS. 06:30 - 07:30 1.00 BOPSUR P DECOMP RIG DOWN BOPE TEST EQUIPMENT. -R/D BOPE TEST ASSEMBLY AND EQUIPMENT. -BLOW DOWN CHOKE AND KILLS LINES. -M/U FOSV ON SAFETY JOINT. 07:30 - 10:30 3.00 TIEBAC P OTHCMP PJSM WITH RIG CREW,BAKER AND DOYON CASING REP FOR VOLANT RIG UP -MOBILIZE POWER TONGS TO RIG FLOOR. -MOBILIZE CENTRALIZER'S,BALE EXTENSIONS,VOLANT TOOL,TORQUE-TURN AND HANDLING EQUIPMENT TO RIG FLOOR. -R/U VOLANT TOOL,TORQUE TURN,BALE EXTENSIONS AND 7"HANDLING EQUIPMENT. 10.30 - 12:00 1.50 TIEBAC P OTHCMP PJSM WITH RIG CREW,DOYON CASING AND BAKER REPS. RUN 7"26#L-80 VAMTOP HC SCAB LINER TIE-BACK ASSEMBLY. -P/U,M/U AND RIH WITH 7-1/2"PORTED SEAL STEM ASSY,7"26#L-80 PORTED FLOAT COLLAR JT AND 7"X-OVER JT T/112'. ALL ASSEMBLIES BAKER LOCKED. ALL VAMTOP HC CONNECTIONS TORQUE TURN TO 11,950 FT/LBS -7"LINER AND ASSEMBLIES DRIFTED TO 6.51" -1)FREE FLOATING SOLID BODY STRAIGHT VAIN CENTRALIZER INSTALLED PER JT. 12:00 - 12:30 0.50 TIEBAC P OTHCMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROVVN-O-MATIC AND SPCC CHECKS- GOOD. Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 35 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 I End Date:1/13/2015 IX3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor.DOYON DRILLING INC. l UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 00:00 11.50 TIEBAC P OTHCMP I M WITH RIG CREW,DOYON CASING AND BAKER REPS. RUN 7"26#L-80 VAMTOP HC SCAB LINER TIE-BACK ASSEMBLY. -RIH WITH 7"SCAB LINER TIE-BACK ASSEMBLY,UTILIZING VOLANT TOOL F/112' T/4233'MD -RUN 1 FREE FLOATING STRAIGHT VANE CENTRALIZER PER JOINT TO 4500' -ENTER 9 5/8"CASING STUB AT 2464',NO ISSUES -FILL AND BREAK CIRC EVERY 10 JOINTS -PUWT=133K,SOW=130K -24 HOUR FLUID LOSS=0 BBPS 8.5 PPG SEA WATER 1/7/2015 00:00 - 00:30 0.50 TIEBAC P OTHCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND-INSPECT PIPE SKATE AND RIG FLOOR EQUIPMENT 00:30 - 12:00 11.50 TIEBAC P OTHCMP CONTINUE RUN 7"26#L-80 VAMTOP HC SCAB LINER TIE-BACK ASSEMBLY,UTILIZING VOLANT TOOL -F/4233'T/9040'MD,PUWT=225K,SOWT= 183K -FILL AND BREAK CIRC EVERY 10 JOINTS 12.00 - 12:30 0.50 TIEBAC P OTHCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND INSPECT PIPE SKATE AND RIG FLOOR EQUIPMEN 12:30 - 16:30 4.00 TIEBAC P OTHCMP CONTINUE RUN 7"26#L-80 VAMTOP HC SCAB LINER TIE-BACK ASSEMBLY.UTILIZING VOLANT TOOL -F/9040'T/11000'MD,PUWT=267K,SOWT= 195K -FILLAND BREAK CIRC EVERY 10 JOINTS 16'30 - 17:00 0.50 TIEBAC P OTHCMP ENGAGE VOLANT TOOL PACK-OFF TO 7" CASING STRING -ESTABLISH CIRC,1 BPM=70 PSI -ENGAGE SEAL ASSY,SLACK OFF TO NO-GO AT 11048'MD,OBSERVE PRESSURE INCREASE TO 200 PSI 17:00 - 19:30 2.50 TIEBAC P OTHCMP PICK UP 7.5'OVER PUWT-EXPOSE PORTS, CIRCULATE 3 BPM=70 PSI -MIRU SCHLUMBERGER CEMENTERS, MOBILIZE CH2 TRUCKS 19'30 - 20:00 0.50 TIEBAC P i OTHCMP PJSM WITH ALL CREW,CEMENTERS,TRUCK PUSHER,TOUR PUSHER,WSL -THOROUGH DISCUSSION OF JOB STEPS, HAZARDS AND SPILL POTENTIAL REVIEW PRESSURE CROSS CHECK 20.00 - 21:00 1.00 TIEBAC P OTHCMP R/D VOLANT TOOL -WSL WITNESS 7"WIPER PLUG LOAD -R/U CEMENT HEAD AND CEMENT LINE Printed 1/26/2015 1 41 51 PM North America-ALASKA-BP Page 36 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 'X3-0164Y-C:(2,500,000.00) Project Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 00:00 3.00 TIEBAC P OTHCMP PUMP 5 BBLS H2O,TEST SLB HARD LINES TO CEMENT HEAD,250/4500 PSI 5 MIN -TEST SLB TRIPS AT 2800 PSI,BLOW DOWN SLB HARD LINE -RIG PUMP 40 BBL HI-VIS SWEEP,3 BPM= 100 PSI -RIG PUMP 100 BBLS DIESEL,5 BPM=470 PSI -RIG PUMP 197 BBLS 9.8 PPG BRINE,(BATCH MIX CEMENT) -SLB PUMP 5 BBL H2O SPACER -SLB PUMP 172 BBLS 15.8 PPG CLASS G CEMENT -LAUNCH T'CASING WIPER PLUG,WSL OBSERVE TADDLE TALE DROP -SLB PUMP 10 BBLS H2O BEHIND PLUG -RIG PUMP 412 BBLS 8.5 PPG SEA WATER,8 BPM -24 HOUR FLUID LOSS=0 BPS 8.5 PPG SEA WATER 1/8/2015 00:00 - 01:00 1.00 TIEBAC P OTHCMP CONTINUE TO DISPLACE CEMENT WITH 412 BBLS 8.5 PPG SEA WATER OBSERVE DIESEL RETURNS TO SURFACE -GRADUALLY SLOW PUMPS TO 1 BPM=1740 PSI, BUMP PLUG AT 4870 STROKES -PRESSURE UP TO 2200 PSI -BLEED OFF PRESSURE AND SLACK DOWN TO NO-GO ASAP -P/U TO 50K OVER SLACK OFF STRING WEIGHT TO 245K -CEMENT IN PLACE AT 00:40 AM,1-08-15 01:00 - 01:30 0.50 TIEBAC P OTHCMP CHECK FLOATS=GOOD -R/D CEMENT HEAD,BLOW DOWN ALL LINES,DRAIN BOP STACK 01:30 - 02:30 1.00 WHSUR P OTHCMP PJSM,R/D TURN BUCKLES AND RISER -SPLIT CASING AND TUBING SPOOL,RAISE BOP STACK 02:30 - 04:00 1.50 WHSUR P OTHCMP PJSM,FMC REP INSTALL 7"E-SLIPS WITH 50K DOWN WEIGHT -R/U WACHS CUTTER AND CUT 7"CASING AT WELL HEAD -L/D CUT JOINT 04:00 - 07:00 3.00 WHSUR P OTHCMP C/O TUBING SPOOL -INSTALL 7"PACK OFF IN CASING SPOOL, RILDS -TEST PACK OFF,250/5000 PSI 30 MIN 07:00 - 08:30 1.50 WHSUR P OTHCMP FMC REP TEST CASING PACK-OFF -250/3500 PSI,30 MIN 08:30 - 10:00 1.50 BOPSUR P OTHCMP PJSM,N/U BOPE,C/O RISER BOOTS 10:00 - 12:00 2.00 BOPSUR P OTHCMP INSTALL TEST PLUG -TEST BODY AND TUBING SPOOL FLANGE BREAKS 1 -250/3500 PSI,5 MIN,CHART -MOBILIZE BAKER DRILL OUT BHA TO RIG FLOOR Printed 1/26/2015 1:41:51 PM • North America-ALASKA-BP Page 37 of 41 Operation Summary Report Common Well Name: 11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date: 1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 15:30 3.50 BOPSUR P OTHCMP PJSM,C/O UPPER PIPE RAMS TO 2 7/8"X 5" VBR -TEST WITH 4"AND 4 1/2"TEST JOINTS,250/ 3500 PSI,5 MIN,CHART -PULL TEST PLUG,INSTALL WEAR BUSHING =9"ID -R/D TEST EQUIPMENT 15:30 - 18:00 2.50 CLEAN P DECOMP 'PJSM,M/U BAKER DRILL OUT BHA#8 -6 1/8"BIT,6 1/8"STRING MILL,BOOT BASKETS,BUMPER SUB,JARS,POS, COLLARS 18:00 - 23:00 5.00 CLEAN P DECOMP RIH W/DP FROM DERRICK -F/238'T/10853'MD,TAG CEMENT STRINGERS -PUWT=225K,SOWT=125K,ROTW=160K, 60 RPM=10K FREE TQ WASH DOWN CEMENT STRINGERS,3 BPM= 710 PSI -TAG SOLID/NO ROTARY WITH 10K WOB AT 10937 MD -POH TO 10907'MD 23:00 - 00:00 1.00 CLEAN P DECOMP CIRCULATE SURFACE TO SURFACE(STS) -8.5 BPM=1480 PSI OA=0PSI -24 HOUR FLUID LOSS=0 BPM 8.5 PPG SEA WATER 1/9/2015 00:00 - 00:30 0.50 CLEAN, P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND INSPECT PIPE SKATE AND RIG FLOOR EQUIPMENT -COMPLETE CIRCULATION,BLOW DOWN — —_ TOP DRIVE 00:30 - 02:00 1.50 CASING P DECOMP R/U TEST EQUIPMENT,MIT 7"CASING -250/3000 PSI,30 MIN,CHART -NOTIFY WTL, RECEIVE AUTHORIZATION TO PROCEED -R/D TEST EQUIPMENT 02:00 - 05:30 3.50 CLEAN I P DECOMP M/U TOP DRIVE,DRILL CEMENT PUWT=220K,SOWT=127K,ROTW=160K, 160 RPM=12K FREE TQ I-TAG HARD CEMENT AT 10937'MD -EST PLUG TAG AT 10985'MD,OBSERVE RUBBER BACK AT SHAKERS -DRILL CEMENT F/10937'T/11080'MD -TAG SAND AT 11080'MD,P/U OFF SAND 05:30 - 06:30 1.00 CLEAN P DECOMP PUMP 40 BBL HI-VIS SWEEP STS,ROTATE AND RECIPROCATE PIPE ;-8 BPM=1540 PSI 06:30 - 07:00 0.50 CLEAN P DECOMP WASH SAND DOWN F/11080 T/11100'MD 07:00 - 08:00 1.00 CLEAN P DECOMP PUMP 40 BBL HI-VIS SWEEP STS,ROTATE AND RECIPROCATE PIP -8BPM=1600PSI -PUMP 10 BBL DRY JOB,MONITOR WELL 10 MIN 08:00 - 13:30 5.50 CLEAN P DECOMP POOH F/11100'T/238'MD -MONITOR WELL BEFORE PULLING BHA THRU BOP 13:30 - 14:30 1.00 CLEAN P DECOMP STAND BACK DRILL COLLARS -UD BAKER BHA#8 Printed 1/26/2015 1:41:51 PM • North America-ALASKA-BP Page 38 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: 1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI.500292248400 Active datum:Kelly Bushing/Rotary Table(62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 CLEAN P DECOMP CLEAN OUT BOOT BASKETS -CLEAR/CLEAN RIG FLOOR -MOBILIZE REVERSE BASKET TO RIG FLOOR 16:00 - 18:00 2.00 CLEAN P DECOMP PJSM,M/U BAKER BHA#9 -REVERSE CIRC JUNK BASKET,4)BOOT BASKETS,BUMPER SUB,OIL JAR,COLLARS 18:00 - 22:00 4.00 CLEAN P DECOMP RIH F/BHA 330'T/11040'MD -PUWT=222K,SOWT=124K 22:00 - 00:00 2.00 CLEAN P DECOMP PJSM,SLIP AND CUT 60'OF 1.25"DRILLING LINE -INSPECT DRAW WORKS AND ADJUST BRAKES -OA=0 PSI -24 HOUR FLUID LOSS=0 BPM 8.5 PPG SEA WATER 1/10/2015 00:00 - 01:00 1.00 CLEAN P DECOMP PJSM,TAG TOP OF SAND AT 11104'MD WITH NO PUMPS -DRY DRILL ON TOP OF SAND -WASH/REV JET DOWN F/11104'T/11109' MD -PUWT=222K,SOWT=124K,ROTW=160K, 30 RPM=11K FREE TQ 01:00 - 03:00 2.00 CLEAN P DECOMP PUMP HI-VIS SWEEPS STS -SAND AND RUBBER BACK AT SHAKERS -8 BPM=2180 PSI,RECIPROCATE PIPE -MONITOR WELL,PUMP 10 BPM DRY JOB, BLOW DOWN TD 03:00 - 07:00 4.00 CLEAN P DECOMP POOH F/11104' T/236'BHA -MONITOR WELLAT BHA 07:00 - 09:30 2.50 CLEAN P DECOMP LAY DOWN DRILL COLLARS -L/D BAKER BHA#9 09:30 - 10:00 0.50 CLEAN P DECOMP CLEAN OUT BOOT BASKETS -CLEAR/CLEAN RIG FLOOR 10:00 - 12:00 2.00 CASING P DECOMP I PJSM,M/U RBP RETRIEVAL TOOL -RIH F/SURFACE T/3328'MD -PUWT=86K,SOWT=85K 12:00 - 12:30 0.50 CASING P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS '-LUBRICATE AND INSPECT PIPE SKATE AND RIG FLOOR EQUIPMENT 12:30 - 16:30 4.00 CASING P DECOMP RIH WITH RBP RETRIEVAL TOOL -RIH F/3328'MD T/11100'MD -PUWT=222K,SOWT=85K 16:30 - 17:30 1.00 CASING P DECOMP !,PUMP HI-VIS SWEEP STS -M/U TOP DRIVE -EST CIRCULATING RATES -WASH DOWNF/11100'TOTOP OFRBP AT 11112'MD -PUMP HI-VIS SWEEP AT 8.5 BPM=1200 PSI 17:30 - 18:00 0.50 CASING P DECOMP RIH F/11112'T/11115'MD -SET DOWN 10K ON RBP,PULL 20K AND RELEASE RBP -WORK PIPE UP AND DOWN PAST SET DEPTH=GOOD Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 39 of 41 Operation Summary Report Common Well Name: 11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date: 1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 CASING P DECOMP CLOSE BAG AND BULLHEAD 40 BBLS -ICP AT 4.5 BPM=2310 PSI,FCP AT 3 BPM= 2720 PSI -MONITOR WELL 10 MIN -9 BPH LOSS RATE _-PUMP DRY JOB,BLOW DOWN TOP DRIVE_ 20:00 - 21:00 1.00 CASING P DECOMP PJSM,POOH,LAY DOWN DP -F/11115'T/10657'MD -MONITOR WELL 10 MIN,HOLE FILL IS NOW STATIC 21:00 - 22:00 1.00 CASING P DECOMP M/U TOP DRIVE,CLOSE ANNULAR -CBU 1X THRU GAS BUSTER,6 BPM=1200 PSI -7 BBL LOSS ON CIRCULATION -MONITOR WELL,1 BPH LOSS RATE _ 22:00 - 00:00 2.00 CASING P DECOMP CONT POOH,LAY DOWN DP -F/10657'T/9614'MD -OA=0 PSI -LOSS RATE=1 BPH -24 HOUR FLUID LOSS=27 BPM 8.5 PPG SEA WATER 1/11/2015 00:00 - 00:30 0.50 CASING P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND INSPECT PIPE SKATE AND RIG FLOOR EQUIPMENT 00:30 - 10:30 10.00 CASING P DECOMP CONT POOH,LAY DOWN DP -F/9614' T/SURFACE -L/D BAKER RBP AND RUNNING TOOL 10:30 - 12:00 1.50 CASING P DECOMP CLEAR/CLEAN RIG FLOOR -PULL WEAR BUSHING,M/U LANDING JOINT -M/U FLOOR VALVE FOR TUBING RUN MOB HANGER TO RIG FLOOR 12:00 - 12:30 0.50 RUNCOM P RUNCMP j PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND INSPECT PIPE SKATE AND RIG FLOOR EQUIPMENT 12:30 - 13:30 1.00 RUNCOM P RUNCMP R/U 4 1/2'TUBING POWER TONGS AND TORQUE TURN EQUIPMENT 13:30 - 16:00 2.50 RUNCOM P RUNCMP PJSM TO RUN 4 1/2"VAMTOP COMPLETION WITH CREW,SERVICE REPS,WSL -M/U PACKER AND TAILPIPE ASSY PER RUNNING TALLY T/646'MD -BAKER LOC ALL CONNECTIONS BELOW PACKER -USE JET LUBE SEAL GUARD 16:00 - 20:00 4.00 RUNCOM P RUNCMP RUN 4 1/2"12.6#,13CR-85 VAMTOP TUBING i COMPLETION -F/646'T/2249'MD -USE JET LUBE SEAL GUARD,TORQUE TO 4400 FT/# 20:00 - 20:30 0.50 RUNCOM P RUNCMP BREAK CIRCULATION,4 BPM=220 PSI Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 40 of 41 Operation Summary Report Common Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date: 1/13/2015 X3-0164Y-C.(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud DateTme:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 RUNCOM P RUNCMP CONT.RUN 4 1/2"12.6#,13CR-85 VAMTOP TUBING COMPLETION -F/2249'T/5103'MD,PUWT=94K,SOWT= 86K -OA=OPSI -LOSS RATE=—1 BPH -24 HOUR FLUID LOSS=17 BPM 8.5 PPG SEA WATER 1/12/2015 00:00 - 00:30 0.50 RUNCOM P RUNCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -LUBRICATE AND INSPECT DRAW WORKAND EQUIPMENT 00:30 - 09:30 9.00 RUNCOM P RUNCMP PJSM,HAZARD ASSESMENT OF RUNNING COMPLETION -CONT.RUN 4 1/2"12.6#,13CR-85 VAMTOP TUBING COMPLETION -F/5103'T/11000'MD 09:30 - 11:00 1.50 RUNCOM P RUNCMP DRAIN BOP STACK,M/U LANDING JOINT AND HANGER -LAND TUBING HANGER IN WELL HEAD ON DEPTH,WLEG AT 11024'MD -FINAL PUWT=165K,SOWT=110K FMC REP RUN IN LDS 11:00_ 12:00 1.00 RUNCOM P. RUNCMP R/U CIRCULATING LINES FOR COMPLETION DISPLACEMENT -TEST LINES,250/3500 PSI,5 MIN,CHART -R/D TEST EQUIP 12:00 - 12:30 0.50 RUNCOM P RUNCMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS 12:30 - 14:30 2.00 RUNCOM P RUNCMP REVERSE CIRCULATE 125 BBLS 120 DEGREE 8.5 PPG SEA WATER -CHASE WITH 210 BBLS 8.5 PPG SEA WATER W/KI-3869 CORROSION INHIBITOR,4 BPM= 550 PSI 14:30 - 17:00 2.50 RUNCOM P RUNCMP DROP ROLLER BALL AND ROD TO SET PACKER -SET PACKER AND TEST TUBING,3000 PSI, 30 MIN,CHART BLEED TUBING TO 2000 PSI -TEST 7"X 4 1/2"IA,250/3000 PSI,30 MIN, CHART i-BLEED TUBING DOWN AND SHEAR DCK VALVE -CIRCULATE BOTH WAYS THRU DCK VALVE, 3 BPM=1070 PSI 17:00 - 17:30 0.50 RUNCOM P RUNCMP BLOW DOWN-R/D CIRC LINES 17:30 - 21:00 3.50 • RUNCOM P RUNCMP PJSM,R/U LRS HOT OIL,TEST LINES,250/ 3500 PSI,5 MIN -REVERSE CIRC 90 BBLS DIESEL FREEZE PROTECT DOWN IA -FCP=1 BPM=364 PSI 21:00 - 22:00 1.00 RUNCOM P RUNCMP U-TUBE FREEZE PROTECT THRU DCK VALVE -FREEZE PROTECTION TO 2670'MD 22:00 - 23:30 1.50 WHSUR P RUNCMP PJSM,FMC REP DRY ROD/SET TWC • -LRS TEST BELOW TWC,250/3000 PSI,5 MIN,CHART -TEST ABOVE TWC 250/3500 PSI Printed 1/26/2015 1:41:51PM North America-ALASKA-BP Page 41 of 41 Operation Summary Report - - - - - - --Common Well Well Name:11-30 AFE No Event Type:WORKOVER(WO) Start Date:12/21/2014 End Date:1/13/2015 X3-0164Y-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:DOYON 16 Spud Date/Time:5/22/1994 12:00:00AM Rig Release:1/13/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 RUNCOM P RUNCMP BLOW DOWN ALL CIRCULATION LINES -R/D HOT OIL LINES AND CIRC MANIFOLD OA=0PSI -24 HOUR FLUID LOSS=4 BPM 8.5 PPG SEA WATER 1/13/2015 00:00 - 02:00 2.00 BOPSUR P POST PJSM,PERFORM SPCC AND EQUIPMENT CHECKS -FLUSH BOP STACK,CHOKE MANIFOLD,TOP DRIVE,AND MUD LINES WITH FRESH WATER -BLOW DOWN ALL LINES AND TD,DRAIN STACK 02:00 - 04:30 2.50 BOPSUR P POST C/O TOP AND BOTTOM RAMS INSTALL 9 5/8"BLOCK RAMS IN TOP RAM ACVITY -INSTALL 3 1/2"X 6"VBR'S IN THE BOTTOM RAM CAVITY 04:30 05:30 1.00 BOPSUR P POST PJSM,N/D BOPE,REMOVE KOOMEY LINES 05:30 - 09:00 3.50 BOPSUR P POST FMC PREP WELL HEAD -N/U ADAPTER FLANGE AND DRY HOLE TREE -TEST HANGER VOID,250/5000 PSI,30 MIN, CHART -TEST TREE,250/3500 PSI,5 MIN -SECURE CELLAR,PREP TO MOVE OFF WELL -RELEASE RIG OFF WELL 11-30 AT 09:00, 1/13/15 Printed 1/26/2015 1:41:51PM 11 -30, Well History (Pre-Rig Sidetrack) Date Summary 01/13/15 T/I/O=TWC/0/0. Made change-out with day crew. Ptd tree and pulled 4" CIW H-TWC#427. Removed Piggy back annulus valves (temp valve#92 IA and temp valve#73 OA) and installed tapped blind flanges. Torqued and Pt'd flanges. 01/14/15 PULLED BALL AND ROD FROM RHC PLUG BODY @ 10,501' MD. PULLED BK-DCK SHEAR VALVE FROM ST#5 © 3,947' MD. PULLED RHC PLUG BODY FROM X-NIP© 10,501' MD. VERIFIED SLIDING SLEEVES @ 10,612' MD AND 10,839' MD WERE IN THE OPEN POSITION RAN 20'x 3.70" DUMMY WHIPSTOCK DOWN TO RESTRICTION @ 11,134' SLM. 01/14/15 T/I/0=105/50/vac Temp=S/I MIT-IA to 3000 psi *""PASSED***(Assist Slickline/Post RWO) Pumped 1.9 bbls of diesel down IA down to achieve MIT-IA test pressure of 3000 psi. IA lost 50 psi in 1st 15 min and 11 psi in 2nd 15 min for a total pressure loss of 61 psi in 30 min test. Bled IA pressure down to 100 psi, bled back-1.5 bbls. IA,OA=otg. FWHP=100/100/vac. MIT tags hung on WV and IA. Fluid packed annulus sign hung on MV. 01/15/15 RAN 20'x 3.625" MAX OD BAKER DRIFT DOWN TO 11,241' SLM (possible restriction). 01/16/15 T/I/O=TWC/65/vac. Bleed IAP to 0 psi (Pre CTD).Wellhouse and flowline removed. IA FL @ surface. Bled IAP to 0 psi in 30 min, held open bleed for 1 hr. No change in IAP during 1 hr monitor. Installed 3000 psi gauge on OA. Job complete. Final WHPs=TWC/ONac. SV, WV, SSV= C. MV=0. IA, OA= OTG. 14:30 hrs. Page 1 of 1 North America-ALASKA-BP Page 1 o Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud DateTme:5/22/1994 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table@62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/16/2015 12:00 - 13:00 1.00 MOB P PRE FINISH RIG MOVE PREPARATIONS -HOLD PJSM FOR RIG MOVE -PULL OFF WELL; SWAB/SSV/MASTER/ IA/OA CLOSED 13:00 - 18:00 5.00 MOB P PRE MOVE RIG. 18:00 - 19:00 1.00 MOB P PRE CREW CHANGE -HOLD PJSM FOR RIG MOVE -DRILLER&TOOL PUSHER CONDUCT ROUTE ASSESSMENT 19:00 - 00:00 5.00 MOB P PRE CONTINUE RIG MOVE TO 11 -NOTIFICATION SENT TO AOGCC FOR REQUEST TO WITNESS BOP TEST AT MIDNIGHT 1/17/2015 00:00 - 06:00 6.00 MOB P PRE CONTINUE RIG MOVE TO DS 11 06:00 - 07:30 1.50 MOB P PRE MOVE PAST FS 2 TO DS 11. STAGE RIG AT EDGE OF PAD. -AOGCC REP WAIVES WITNESS TO BOP TEST AT 0630,HRS 07:30 -• 08:30 1.00 MOB P PRE LAY IN T-MATS AT WELL,INSPECT WELL GAUGES AND VALVE ALIGNMENT. NO PRESSURE ON IA,OA. PJSM FOR MOVING .OVER WELL. TEST ESD. PULL RIG OVER DS 11-30. RIG ACCEPT 0830 HRS. 08:30 - 11:00 2.50 MOB P PRE PREP RIG FOR OPERATIONS -CLOSE IN CELLAR,MAKE SENSOR CONNECTIONS,INSTALL GUARDS AND GROUND STRAP -STAGE SUPPORT EQUIPMENT -CYCLE TREE VALVES,PRESSURE TEST TREE CAP,ND CAP 11:00 •- 14:00 3.00 BOPSUR P PRE NU BOP,RECORD STACK MEASUREMENTS. INSTALL"HOT TUB". RIG UP SLING FOR INJECTOR. TEST ALL AUDIBLE AND VISUAL ALARMS. 14:00 - 15:00 1.00 BOPSUR P PRE FLUID PACK STACK,PREPARE EQUIPMENT FOR BOP TEST. 15:00 - 18:30 3.50 BOPSUR P PRE BEGIN BOP TEST. AOGCC REP WAIVED WITNESS. NORDIC FIELD SUPERINTENDENT AND BP WSL ON LOCATION TO WITNESS TEST. FUNCTION ALL RAMS AND ANNULAR FROM CTS REMOTE CONSOLE. -CONDUCT H2S RIG EVACUATION DRILL. CONDUCT AAR TO DISCUSS HAZARDS, REACTIONS OF PERSONNEL ON RIG. 18:30 - 22:45 4.25 BOPSUR I P PRE TEST BOP -CREW CHANGE/POST RIG-MOVE WALK AROUNDS AND RIG-UP VERIFICATIONS -HOLD PJSM AND DISCUSS PRESSURE CROSSCHECK WITH ONCOMING CREW -CONTINUE TESTING BOP TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES 22:45 - 00:00 1.25 BOPSUR P PRE HOLD PJSM,FILL COIL,STAB ON INJECTOR AND TEST IRV/PACK-OFF TO 250 PSI LOW/ I 3500 PSI HIGH FOR 5 MINUTES 1/18/2015 00:00 - 01:30 1.50 BOPSUR P PRE PERFORM SLACK MANAGEMENT,CUT 225' OF COIL. MU COIL CONNECTOR,PT AND PULL TEST CONNECTOR TO 35K. Printed 1/27/2015 10.19:46AM • • North America-ALASKA-BP Page 2 efQS� Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UW:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:00 0.50 BOPSUR P PRE STAB ON INJECTOR,PUMP SLACK FORWARD AND VERIFY TORQUE ON TREE BOLTS. 02:00 - 02:30 0.50 BOPSUR P PRE HOLD H2S/MAN DOWN/RIG EVACUATION DRILL AND AAR. 02:30 - 03:15 0.75 BOPSUR P PRE POP OFF INJECTOR AND HEAD UP BHI. PULL BACK INJECTOR. 03:15 - 04:00 0.75 BOPSUR P PRE PRESSURE TEST BHA CHECK VALVES TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 04:00 - 04:45 0.75 DHB P PRE MOBILIZE DSM LUBRICATOR TO RIG FLOOR AND RU TO SLB LUBRICATOR(7"X 9"OTIS CROSSOVER). 04:45 - 05:45 1.00 DHB P PRE HOLD PJSM AND PT DSM LUBRICATOR 250 PSI LOW/3500 PSI HIGH. PULL TWC ON FIRST ATTEMPT. OPEN UP TO CLOSED CHOKE AND READ 35 PSI ON TUBING. BLEED OFF,SHUT-IN AND PRESSURE BUILDS BACK TO 35 PSI. 05:45 - 06:15 0.50 CLEAN P PRE HOLD PJSM FOR BULLHEAD KILL,LINE UP DOWN COIL AND BACKSIDE. 06:15 - 07:45 1.50 CLEAN P PRE BULLHEAD KILL AT 4.5 BPM,STARTING WHP 2475 PSI WHILE PUMPING. REACH KILL RATE OF 4.5 BPM AT 4 BBLS AWAY AND START KILL VOLUME. PUMPING DOWN COIL AND BACKSIDE. 07:45 - 08:00 0.25 CLEAN P PRE BULLHEADED 270 BBLS OF 1%KCLAT4.5 BPM,FINAL CIRCULATING WELLHEAD PRESSURE OF 1975 PSI. OPEN CHOKE AND MONITOR FOR FLOW. WELLHEAD PRESSURE AT ZERO. 08:00 - 08:30 0.50 CLEAN P PRE BEGIN 30 MIN FLOW CHECK,PVT=245 BBLS 08:30 - 08:45 0.25 CLEAN C - PRE NO FLOW CONFIRMED,PVT=245 BBLS. HOLD PJSM FOR MAKING UP MILLING/DRIFT BHA. FILL HOLE. 08:45 - 09:45 1.00 CLEAN C WEXIT MU MILL BHA#1 -MILL GAUGE 3.81 GO/3.80 NO-GO,REAMER GAUGE 3.80 GO/3.79 NO-GO -STAB ON INJECTOR AND TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES -WELL LOSING 10 BPH AFTER KILL 09:45 - 12:00 2.25 CLEAN C WEXIT RIH WITH BHA#1 -RIH AT 100 FPM -CIRCULATE WITH EDC OPEN AT TAKING RETURNS TO THE PITS -IN/OUT RATE WHILE RIH=3.02/3.37 BPM, PVT=249 BBLS,10 BPH STATIC AND CIRCULATING LOSSES AFTER WELL KILL. LOSSES INCREASED TO 14 BPH DURING RUN IN. Printed 1/27/2015 10 19:46AM • • • North America-ALASKA-BP Page 3 o Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date. X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 CLEAN C WEXIT RECORD SLOW PUMP RATES. PUW 45K AT 11,050'. SOW WHILE RIH 20K. MOVE DOWN PUMPING AT MIN RATE. NO INDICATION OF I OBSTRUCTION OR DEBRIS IN THE AREA OF 11,134'. MOVE PAST EASILY. CONTINUE TO MOVE DOWN WITH NO ISSUES,SLIGHT TAG AT 11,271'. PICKUP,BRING ON PUMPS AND BEGIN CLEANOUT MILLING RUN. -BEGIN MILL OPERATIONS FROM 11,260'AT 2.75 BPM,1560 PSI. CONTACT AT 11,264' WITH INCREASE IN PRESSURE OF 250 PSI. MOTORWORK DOWN TO 11,269'. CLEAN OPERATIONS BELOW 11,270'. -CONTINUE TO RUN DOWN AT 2.73 BPM,1560 PSI,WITH SLIGHT BOBBLES IN MOTORWORK. CLEAR TAG AT 11,334'WITH MOTORWORK INCREASE TO 1990 PSI. CLEAN UP THROUGH 11,336'. NO FURTHER MOTORWORK SEEN ON RUN FROM 11,336' i TO BOTTOM TAG OF 11,605'. LOG TIE-IN WHILE RUNNING TO BOTTOM WITH-8'CORRECTION. ATTEMPT TO TAG CEMENT PLUG AT-11,605'. SEEMS TO BE MILLING INTO GREEN CEMENT. DOWN ON PUMPS TO MIN RATE,TAKE WEIGHT AT 11,616'. PICK UP ABOVE GREEN CEMENT. -AVERAGE OF 10-12 BPH LOSSES DURING THIS OPERATION;MW IN 8.36 PPG,MW OUT 8.38 PPG 14:30 - 15:15 0.75 CLEAN P WEXIT PICK UP TO 11,560',PUW 46K. PARK AT 11,560'AND PUMP REST OF HI-VIS PILL OUT OF COIL IN ATTEMPT TO SETTLE INTO FORMATION TO SLOW LOSSES. CIRCULATE AT.65 BPM,350 PSI,MW IN 8.33 PPG,MW OUT 8.38 PPG. -FLOW CHECK OFF BOTTOM WITH PILL OUT OF COIL. NO FLOW. 15:15 - 15:45 0.50 CLEAN P WEXIT PICKUP HOLE AT MIN RATE TO DRIFT TUBING. DRIFT FROM 11,560'TO 10,390',NO ISSUES ON UP PASS. -MW IN 8.32 PPG,MW OUT 8.38 PPG. LOSS RATE HAS SLOWED TO-6 BPH. 15:45 - 16:30 0.75 CLEAN P WEXIT LOG CCL FROM 10,400'TO 11,605'WHILE CONDUCTING DRY DRIFT DOWN TO CEMENT PLUG. DRY DRIFT GOOD UP TO 11,131'. STOP LOGGING CCL,PU AND CLEAN UP AREA. Printed 1/27/2015 10:19:46AM • • North America-ALASKA-BP Page 4 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:15 1.75 CLEAN P WEXIT BRING PUMPS UP TO 2.7 BPM,1780 PSI. BEGIN DOWN PASS WITH 15K SOW. LOSSES PICKED UP AGAIN WITH INCREASED PUMP RATE. MILL DOWN FROM 11,120'. MOTORWORK INCREASED 90 PSI AT 11,129'BUT NOT TAKING ANY WEIGHT. INCREASED TO 230 PSI AT 11,131'. DROP DOWN TO FREE SPIN BUT PICKED BACK UP. MOTORWORK RANGING FROM 50-90 PSI. PICK UP FROM 11,135'AND MAKE SECOND PASS. SIMILAR MOTORWORK WHILE WORKING THROUGH 11,128'TO 11,135'. PICK UP TO 11,125'AND MAKE THIRD PASS DOWN WITH SIMILAR MOTORWORK. MAKE FOURTH PASS AT A MUCH SLOWER RATE WITH 40-100 PSI MOTORWORK. PICKUPS AFTER THIRD AND FOURTH PASSES CLEAN,PUW 45K. DRY DRIFT THROUGH 11,125'TO 11,135'AND IT LOOKS GOOD. -MW IN 8.36 PPG,MW OUT 8.39 PPG, LOSSES AT 6 BPH 18:15 - 21:00 2.75 CLEAN P WEXIT BEGIN LOGGING CCL DOWN FROM CURRENT DEPTH OF 11,135'. ENCOUNTER MOTORWORK AGAIN AT 11,259'(SAME AREA OF CLEANUP EARLIER IN OPERATION). 80 PSI OF MOTORWORK FROM 11,259'TO 11,265'. PU AND MAKE CLEAN PASS DOWN 50'PAST PLANNED WHIPSTOCK SETTING DEPTH(11,550'). PU TO 11,250',MAINTAIN PUMP RATE FOR BU,AND CONTINUE CCL FROM 11,240'TO 11,600'. 21:00 - 22:15 1.25 CLEAN P WEXIT CCL UNABLE TO CAPTURE 7"COUPLING DATA. PU AND RE-ATTEMPT AT SLOWER TRIP SPEED AND REDUCED PUMP RATE WITH NO SUCCESS. POH FOR WHIPSTOCK ASSEMBLY AND ALTERNATE MWD TOOL. 22:15 - 00:00 1.75 CLEAN P WEXIT POH WITH CLEANOUT/MILLING BHA#1 -FLOW CHECK;NO FLOW -POH AT 100 FPM IN/OUT RATE=3.2/2.6 BPM 1/19/2015 00:00 - 01:45 1.75 CLEAN C WEXIT LD CLEANOUT/MILL BHA(BHA#1) -HOLD PJSM FOR LD BHA -LD MILL,REAMER AND MOTOR(UNABLE TO BREAK MILL) -REAMER GAUGE:3.75 GO/3.74 NO-GO -MU WHIPSTOCK BHA(BHA#2) -STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 01:45 - 05:00 3.25 STWHIP C WEXIT RIH WITH WHIPSTOCK BHA(BHA#2) -OPEN EDC AND RIH AT 80 FPM -IN/OUT RATE WHILE RIH=1.4/1.8 BBLS, PVT START=145 BBLS -MW IN 8.33 PPG,MW OUT 8.39 PPG, LOSSES AT 4 BPH -WT CHECK AT 11,100'=48K,RIH WT=17K -TIE IN TO PDC LOG WITH-7'CORRECTION ON GR • Printed 1/27/2015 10:19:46AM North America-ALASKA-BP Page 5.0015 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: X3-0164Y-C:(3,536,317.00) • Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 05:00 - 06:30 1.50 STWHIP C WEXIT RE-LOG CCL PASS FROM 11,000'TO 11,600'AT 15 FPM. DATA FROM CCL INCONCLUSIVE ON COLLAR LOCATION. CORRELATE 7"CASING SUMMARY FROM ORIGINAL SUMMARY OF CASING RUN IN 1994 TO GEO PDC LOG TO ENSURE GOOD SET POINT. 06:30 - 07:00 0.50 STWHIP C WEXIT PICK UP TO POSITION WHIPSTOCK PICK UP WEIGHT 48K,SOW 21K POSITION TOP OF WHIPSTOCK AT 11,500'. BRING ON PUMPS TO .40 BPM,POSITIVE INDICATION OF SHEAR AT 2900 PSI. PICK UP,SET DOWN 5K TO CONFIRM SET. SET DOWN LOWER THAN EXPECTED BUT WHIPSTOCK DID TAKE 6K DOWN WEIGHT. 07:00 - 08:45 1.75 STWHIP C WEXIT PICK UP WITH SLIGHT OVERPULL AND INCREASE IN RETURN WEIGHT TO INDICATE RUNNING TOOL IS CLEAR OF WHIPSTOCK PUW 48K PARK ABOVE WHIPSTOCK AND BEGIN DISPLACEMENT TO 9.5 PPG POWERPRO MUD SYSTEM. -MW BEFORE DISPLACEMENT:MW IN 8.32 PPG,MW OUT 8.39 PPG,LOSS RATE OF-3 BPH 08:45 - 09:15 0.50 STWHIP C WEXIT WELLAND COIL DISPLACED TO 9.5 PPG MUD. PERFORM FLOW CHECK 09:15 - 11:15 2.00 STWHIP C WEXIT COMPLETE MUD SWAP IN PITS. POH AT 100 FPM. STARTING PVT 100 BBLS. MW IN/OUT =9.41/9.50 PPG •11:15 - 11:30 0.25 STWHIP C WEXIT FLOW CHECK. HOLD PJSM FOR LAYING DOWN BHA#2,AND PICKING UP BHA#3. PVT FINAL=40 BBLS 11:30 - 12:00 0.50 STWHIP C WEXIT LAY DOWN BHA#2 12:00 - 13:00 1.00 1 STMILL P WEXIT MAKE UP BHA#3,WINDOW MILLING ASSEMBLY. STAB ON,PRESSURE TEST QUICK TEST SUB. 13:00 - 15:30 2.50 STMILL P WEXIT RIH WITH MILLING BHA. -MW IN 9.35 PPG,MW OUT 9.50 PPG,3-4 BPH LOSSES DURING TRIP IN. 15:30 - 16:00 0.50 STMILL P WEXIT DOWN ON PUMPS. MOVE DOWN TO ENGAGE WHIPSTOCK TRAY. MOVE DOWN TO 11,495',CORRECT-4'TO DEPTH OF 11,491'. SOW OF 18.5K ENGAGE PINCH POINT OF TRAY. TAKE WEIGHT AT 11,513' CORRECTED DEPTH;PINCH POINT 4.6' • I DOWN MAKES CALCULATED TOP OF WHIPSTOCK AT 11,508.4'.PICK UP WITH BREAKOVER AT 47K -RECORD SLOW PUMP RATES 16:00 - 18:00 2.00 STMILL • P WEXIT BEGIN MILLING FROM 11,512'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.45 PPG,MW OUT 9.46 PPG 1 -IN/OUT RATE WHILE MILLING=2.6/2.6 L 1BPM -LOSSES HAVE SLOWED TO LESS THAN 1 BPH WHILE MILLING -SET DOWN-1.7 K WOB/150-200 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF Printed 1/27/2015 10:19:46AM • North America-ALASKA-BP Page 6 ages Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,513'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.45 PPG,MW OUT 9.46 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE-1 BPH -SET DOWN-1.7 K WOB/200 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 20:00 - 22:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,515'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.44 PPG,MW OUT 9.45 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM LOSS RATE-1 BPH -SET DOWN-2.4 K WOB/250-300 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 22:00 - 00:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,517'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.44 PPG,MW OUT 9.45 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE-1 BPH -SET DOWN-2.4 K WOB/300 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 1/20/2015 00:00 - 01:45 1.75 STMILL P WEXIT CONTINUE MILLING FROM 11,517'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.44 PPG,MW OUT 9.45 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING-1 BPH -SET DOWN-2.4 K WOB/300 PSI DIFFERENTIAL BOTTOM OF WINDOWAT 11,520';CONTROL MILL TO 11,521'AND ALLOW REAMER TO CLEAN BOTTOM OF WINDOW;INCREASE ROP-5 FPH IN NEW FORMATION 01:45 - 03:15 1.50 STMILL P WEXIT MILL RATHOLE -MW IN 9.44 PPG,MW OUT 9.44 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING 1 BPH -MILL RATHOLE AT 5 FPH,2-3 K WOB,350 PSI DIFFERENTIAL -TAKE SAMPLES FROM 11,520'AND 11,525' 03:15 - 06:30 3.25 STMILL P WEXIT CONTINUE MILLING RATHOLE TO 11,530' -MW IN 9.44 PPG,MW OUT 9.44 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING 1 BPH -MILL RATHOLE AT 2 FPH;4 K WOB AND 450 PSI DIFFERENTIAL 06:30 - 08:45 2.25 STMILL P WEXIT CONDUCT REAM PASSES AND ALL LOOKS GOOD. DRY DRIFT AND WINDOW LOOKS GOOD. FLOW CHECK WELL,NO FLOW. PUMP DOWN HI-VIS PILL TO BOTTOM TO CLEAN UP RATHOLE,GET AROUND AND BEGIN SAMPLE UP HOLE. Printed 1/27/2015 10:19:46AM 0)L. L. a) \ o cNs § - ig 2 g / $ _ \ cp co \ k 7 \ § CO 0 \ ` x o o x $ t \ 2 ; f \ ) \ .- 3 } ) / \ { CO \ ƒ § } k 0 0 0 0 0 o _ k ii ) ) —6) > ) f m \ co : a) d e _ 3 § A u ) \ ) \ . / f § o \ / $ ) 2 \ ) ) k oal § - § f - -, o « § .0 § � / / ( •\ ,— ' , \ » / / I j §al fa' 2 > .. } 0 o et § ° — m I_J @ $ _ ® > \ c \ / r \ a \ - \ j j \ ± 3 \ k O ) f k 2 E E c § < ■ ) $ . & @ « ¥ U . Zf \ ) 2 •;a--- 0 / ) / { \ _ § § _ § \ 7 / CI » a § 6 k g \ ) k co _ a E -0 § P \ \ \ \ ° d _ _ i. < § E k E I . Hj \\ » \k iii e 3 2 \ /To 0 0 < Wct \ O ( UJ± § k Z e u LU < c u_ ct § k ] ( & co csi § ± ) - d u z > e » / e •-- \ \ <7.7 \ » ) k co / \ ƒ m G -• § g o CL & § CO J > _ c ± § , Z coo °° ° co ® m os UJ \ \ \ \ \ ct a c { \ / ` a cv 4 2 .. \ / $ / G •• i E Li •• \ § _ 2 E ! k .. 2 &L7L El. * ( ƒ t E. \ # k § \ / \ } e \ / » 2 k [ o z/ G e .0 A o \ » I P. 2 $ ] o ) o 8 6 6 6 NU_ 0 d o -R E a) C LL Q L .O-. 0) Q m fa 0_ N N TOJ ^ Si d Q FO O - = E N 2 Co r.- .2 .2 O N as E (n m D -z z a U 0 0 m `g r- a) U d 0 a F en o 0 o CD o - m F F 1 O) O CD N N N Co H ~ ry Co a) E d N > co en p O Z , 1. m 'E LL F o a 7. F v c a z t o d .. y m a 1 1c m o v fn y O z (0 O c a j W o C J a) o. LL N) ea 'fn Q X (n a aa)) m Jo -O (n a m � £ z z en ` _ ` .4 w• O) a ^ £ u) O N 'o d l0 O_ O. - 7 i e- N m -y >- j 'O Z VJ o N (.7 a) 3.3_ = 4. C C. o G .. CU a o fa O CoU a) N nN d E a N 'O L �a til � 0 PN 70 nE Fet c c a Q 2 _ s '5 Nati N 0- Ce Ce U E= > t N Fd6 3 II N w Q am ( N a) ali c N NC @ .. .- f o N z m Z .E X ~ J 2 c d Z F U Fp N O) N N E E CC ma a E. 0 in •-• a, m o c r 41) 4 c 10 m o 0 0 D aE) o U N o m > U) U 2 F- --) = CC 2 O F- LL o Z N ). Co a) o T N Lc; N Y m 2 a c 0 p Ow .N F- (n z E E Q I a ' coa o E U 2 0 E. g z .3i N O a) Z > d 0 U rn ¢ U EE . is 2.M j N 7 R t "E 7 OI (n O) .2 O J o D co O O EO 6 a a) U' F' = m mfes/) O x LL' Z 0 .. C N 7 2 a .o o O. 7 _ O N LL F- O x w o o C M a o o) a: E v F � o ' ` � � N en Q z 1 N 7 v W V Q o ro N ^ N C E E c.`,.m f0 7 a — ^ ^ = iii z a w z Q z z O O 0 d = 03 T = I- >Z c[ ~ oo i� ~ a E M 1 QJ W 2 C L N N 0 _1of c . o o O co Un u) U a) Z o E• co > v n Nz o OK F N Q 0 Tu 70 • j m 7 C dryE2 ti 7 p m T J cW T `O 0 W 7 O O F- N O H N LL a0 0 2 E i u] Q 7 7 aCaC 7 d3 j QN O o y to a LL6 av v° > o ` wU a W U D (n li E ` Ei c o w o g 2 N H H U 0 D 03 U CO F- _ TREE= a CNV .•D= • 1 -30 S"�rz"CHROME E TBG***...., BG'ANtaLE>700 12134'. ACTUATOR= BAKER C BF. EfF!= 624' y�� Id BF.ELEV_ 2224' —14-112"FES X 1�,D=3.813" 7 KOP 1253' —"CONDUCTOR, Max Angle= 93"@ 13333' _#, • GAS LFT MANDRELS Datum MD_ NA �. ST MD TVD DEV TYPE VLV LATCH PORT GATE 03tumTVD= 8800 SS D ►, 5 3953 3702 r 41 KBG-2 DMY BK 0 01/14/15 4 6976 5674 ' 51 KBG-2 DMY BK 0 01/09/15 9-5/8-CSG STUB/TOC(12/30/14) --I —2466' 3 8836 6894 IF 49 KBG-2 DMY BK 0 01/12/15 9-5/8"DAMAGED CSG(12/27/14) —I—3260'-—3342' - I -- 2 9703 7411 ' 57 KBG-2 MAY BK 0 01/12/15 1 10362 7757 Pr 58 KBG-2 DMY BK 0 01/12/15 133/8"CSG,6811,NT 80 BTC,D=12.415' 3982' b,+ TOC(01/08/15) — 4500' .#: *: 10440' —14-1/2"HES X NP,D=3.813" w r. Minimum ID = 3.813" @ 2224' "; 4-1/2" HES X NIPPLE *' ►'��" 10471' —{7"X4-1/2"FES INT PKR,D=3.856" SEALBORE SUB,ID=3.810" }— 10737 4, 10508' —�4 112"FSS X NP,D=3.813" SEA LBORE SUB,ID=3.810' 10959' �M ' ; 10618' -J4-11I2"XOSLD SLV,D=3.813(OPEN 119/15) 4-12 TBG,12.6#,13C11-85 VAM TOP, —I 11030' � I I ; 0152 bpf,D=3.958" (BTM 10'PERFORATED) 105' -14-1/2"XD SLD SLV,D=3.813(OPEN 1/9/15) 9-5/8"X 7"FRD-E ZXPN LW — 11045' J ' w/FLEXLOCK HGR,D=6.210 11030' 4-1/2"WLEG,D=3.958" 7"SCAB LNR 26#,L-80 VAM TOP HC, —{ 11055' 11168' H 9-5/8"X 4-1/2'UNKDUE OVERSHOT .0383 bpf,D=6.276" 11182'_H4-1/2"I- SXNIP,D=3.813" 4-1/2'TBG STUB(01/03/15) —r 11148' liMI 11203' H9-5/8"X 4-1/2"BKR S-3 FKR,D=3.875" 9-5/8"X 7"TESK,TNV LTP &LPN?HGR,D=? — 11232' 11228' --{4112"I-ES X NP,ID=3.813" 4-1/2"TBG,12.6#,13CR-80 VAM ACE --I 11249' = lc D .0152 bpf, =3.958" " Il 11253' H7"X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(06/18/03) --{ 11247' 11276' —17"X 4-1/2"BKR SABL-3 PLR,D=3.94" r ,.,, 4-1/2"TBG,12.6#,L-80 TDS, —I 11322' 11310' H4-1/2"OTIS X NP,D=3.813" .0152 bpf,ID=3.958" 11322' H 4-1/2"WLEG,D=3.958" 9-5/8'CSG,47#,NT-80S NS(O;,ID=8.681" H 11393' , 11336' H ELMD TT LOGGED 12/16/94 7"LNR,29#,NT-80 NS(X;,.0371 bpi,D=6.181" H 11415' — 11508' —7"WFPSTOCK(01/19/15) LNR HOLES(PROF 04/14/09) 11665'& 12180' 11596'ELMC}—I TOC(11/25/14) RESTRICTIONS,PLED —112180', 12504'-12540'{`\ �.. 11615' _7"POSISET PLUG(09/22/14) TO 3 25"(07!07/14) TOP C 4-1/2"LNR 12663' 1265TFSH-BOT DISCO,CRC SIU,MOTOR, 7"LNR,26#,NT-80 NSOC,.0383 bpf,ID=6.276" —I 12825' 13.25"PALL(02/09/14) 12663' -jr'X 4-12"TIVV SS HIGH PERFORATioN SUMMARY ANGLE HGR PKR D=4.00" REEF LOG:M )POROSITY ON 06/04/94 •#• 12751' -�4-12"FORT®JONT{41.49') ANGLE AT TOP PERF:88°@ 12720' I j 12766' —FISH-HES OBSIDIAN Note:Refer to Roduction DB for historical pert data I O CSP, SIZE INTERVAL INTERVAL Opn/Sgz SHOT SQ14..1_133&PUSHED DH(02/09/14) 3-3/8' 6 12400-12412 S 03/31/98 06/08/10 I - - - - - - CLAW 13714' —FISH-SAFETY ADE3-318" 6 12432-12458 S 03/31/98 06/08/10 - - - " - - FROM DOG COLLAR 3-3/8" 4 12500-12550 S 05/10/96 06/08/10 - - - - - - 3-3/8" 4 12602-12638 S 05/10/96 06/08/10 41/2"LNR 12.6#, — 13719' - - 3-3/8" 5 12720-12792 C 06/13/94 4-12" SLOT 12792- 13696 SLID 06/14/94 L-80/13CR NSCT, .0152 bpf,ID=3.958' DATE REV BY COMNENTS DATE REV BY COMMENTS PRLDHOE BAY UNIT 06/16/94 N28E INITIAL COMPLETION 01/20/15 CK/JMD FINAL ODE APPROVAL WCL: 11-30 06/26103 N4ES RRVO 01/21/15 CK/JMD UPDATES PER SHFTED RVVO TALLES PERAK No:'1940770 01/13/15 D-16 RWO API Na: 50-029-22484-00 01/15/15 JIVD DREG HO ACTIONS SFC 28,T11 N,R15E,1185'FSL&383'Fa 01/19/15 PJC/JMD ORLG HO CORRECTIONS 0120/15 MCIJMD GLV C/O(01/14/15) BP Exploration(Alaska) Imo'`-- T" a _ c� v ba V ro co /_N(J V U co c u a t Q n i CI) O O - a) C s c L70 w H T ro O @ L Yo CC (IV O ~ a1 O O '6 LL O co a.) ro >. 0_ Q O Q 0-0 u a o) Q E C m J 0 R Z �' a) o yN., y to Q �~.. O mW ' V, C C C co CD 2 2 ¢cs . 0 v v v in e4 c 1 > Ln 0 2 C7 u u u c m a) Q a) ZQ 0 O u m m o o > M t0 00 00 T r0 1-- ~Q a- N., N e- N Z T L 7 ci- • r0 a) V CO C O v E Q ) co C y C C -0 N V pW. 0000000 vca O 0 ) >. W- W W W W W W 5 `'--- N r •--. 1- LL LL LL LL LL LL LL O y Q) -C G Q O J J J J J J J , a > '"' ,.. L.... Q Q Q Q Q Q Q �= O p O GO o Z 2 Z 2 2 2 2 E a ai 4- .-+ o : LL LL LL LL LL LL LL C o 0 C v an a) a) a-, • G O v. .. .., IL- C CO N N 2a --. li. < a) C V > u m C. •"` \ CO a� � w W u co ; 0 �61_ 2— o E.- W W IL IL ra al m '16m co Mom= 0rnrn Z _ V e LLJ _ Inom/ L-+ nS o za a172 } cc N J J J J O J J o W 3 3 "' a) n. CI C..1 m m uir 11J C >' C= V• a N . x N 0 '� u Ltd Q Q Q Q Q Q Q Lu o mm m m CO CO CO C E Cr) UJxxxxxxx '� ^ Lu 0 0 0 0 0 0 0 a LAU J_ Lu DD = DMMM C GI Q' d' red' receR' r6 m CL a a a a a a c o fp u U O N CZ C N C) 0 0 r^ C O N O O N O C < tJ .w 0 0 0 0 0 0 0 OD 5 LL 0 0 0 9 0 0 9 .Lo- 'j O; NNLLNLLO r 0 C .,... 0 0 0 U O O 0 •v o L C CC re L' W Llt W V 5 O Y EA 8 O CO V Y Q '' ,�: Z._ O N O M O M O f0 a) 7 n , e m ar J cc N qp ^ M y +�:.-I. O r 0 N �= cc i iilic 7 E Z cud a a co Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items ~ Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA Diskettes, No. [] Other, No/Type OVERSIZED · ' ..~,.. Logs of various kinds [] Other COMMENTS: Date: TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si UNSCANNED, OVERSIZED MATERIALS AVAILABLE: l~j ~ D ~~~ FILE # l //yt C~ ~n ~- To request any/all of the above information, please contact: Alaska Oil & Gas Conservation Commission X333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279-1433 ~ Fax (907) 276-7542 04/28/11 Sctdumberger /10.5729 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description .r� Date BL Color CD 15 -09A BBKA -00096 PRODUCTION PROFILE / io ' 77 03/14/11 1 o`T(O 1 17 -06 BBKA -00094 INJECTION PROFILE ()Me / h ,- _ 03/10/11 1 � "t 1 C -12B BAUJ-00064 MEM PRODUCTION PROFILE _.46 i 1tGi�r_ ' ' 1 + • lii 1 BLPO -00079 MEM PRODUCTION PROFILE ' '®' 00/ it� —IMII.M1 r.. BJGT- 00022 ®MIT _ 0FA `. -- 02 -189 BLPO -00087 L'1al5[Nclllliezalfsa . - " P!M O -- BJGT -00023 rS4r "T' Iellk- ' :71 1,11'10 -_ L -210 BLPO -00086 MEM INJECTION PROFILE ' • 03/23/11 �F!� V -105 BLPO -00091 MEM INJECTION PROFILE _ r 03/29/11 Ir • V -220 BBSK -00065 INJECTION PROFILEIWFL at"ra ♦ • 0�' al�� -- V -212 BD88 -00096 MEM INJECTION PROFILE T m, �7 ' ' O l� 0� perigll� L -214A BCRJ -00073 INJECTION PROFILE i .,271. 03/18/11 O�O -- V -223 BAUJ -00071 MEM INJECTION PROFILE „♦ i ' 03/19/11 0� 1M 0 —_ BAUD -00077 hia'_,elxy_L_ > � « L4"lf/.f:7 70:_nil 0�� 3- 05/0 -29 BG4H -00043 ;T Ki ' ' 0 �� IIIMMI_- 1- 47A/M -20 BLP0 -00092 MEM PRODUCTION PROFILE =rTrnellm ' ' oe!'�: mIIIIM-- 1-25A/K-22 BBSK -00057 [I/ MIIIIIIIG271ffo C IKSEEEIMPTiTskl!MldMIO11=1111E∎ BCUE -00113 y �[ '-- .�1 U FT 9088.00097 GC�I!'.li3C �eeQ��e$T.L'C�l?INIMMOMMIIIIIMINI 04 -11A AWJI -00134 INJECTION PROFILE UZ D '' 03/24/11 1 t`' 1 P2 -41 BG4H -00044 PRODUCTION PROFILE - _.-a " 03/22/11 1 M wee �Ii� 1 D-2613 BMSA -00009 �'�Z.. IF�7MWE�0 -- 02 -18B BLPO.00087 MEM PRODUCTION PROFILE � ✓ ,(. •41r *7•-• Z-20 BPSG -00010 f ; • 03/29/11 1 4 x 1 -- Y-29A BCUE -00122 MEM LDL I i .0 03/20/11 1 0/5 ,MM. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd Anchorage, AK 99503 -2838 111 STATE OF ALASKA ALASKA APAND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other Ei CEMENT SQUEEZE Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 112 Exploratory ❑ 194 -0770 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 - 50- 029 - 22484 -00 -00 8. Property Designation (Lease Number) : -,:. 9. Well Name and Number: ADLO- 028321 „ 11 -30 10. Field /Pool(s): _ PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13719 feet Plugs (measured) 12690 feet true vertical 8759.48 feet Junk (measured) 13714 feet Effective Depth measured 13719 feet Packer (measured) 11203 11276 12663 feet true vertical 8759.48 feet (true vertical) 8212 8252 8778 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 36 - 116 36 - 116 Surface 3947' 13- 3/8 "68# NT -80 35 - 3982 35 - 3723 5020 2260 Production 11361' 9 -5/8" 47# NT80S 32 - 11393 32 - 8317 6870 4760 Liner 195' 7" 29# NT -80 11220 - 11415 8221 - 8329 8160 7020 Liner 1410' 7" 26# NT -80 11415 - 12825 8329 - 8785 Liner 1071' 4 -1/2" 12.6# L -80 12648 - 13719 8776 - 8759 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ - True Vertical depth: • Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13CR80 29 - 11262 29 - 8245 4 -1/2" 12.6# L -80 11263 - 11322 8245 - 8278 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" BKR S -3 PKR 11203 8212 4-1/2" BKR SABL-3 PKR 4 -1/2" TIW SS HIGH ANGLE HGR PKR 12®63 b.� 12. Stimulation or cement squeeze summary: Intervals treated (measured): ;110,; MA' 1 0 01, (, ii6ska Oil &. G Ca, Gviiimission Treatment descriptions including volumes used and final pressure: • k I menage 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 105 25,204 1,355 741 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 ,- Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil 0 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSPD SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka_ Printed N +me J. Lastu - Title Petrotechnical Data Technologist Signat e BJj \Q- \ Phone 564 -4091 Date 5/4/2011 S•9 •(l Form 10-404 Revised 10/2010 ROOMS MAY Q.� �� Submit Original Only 11 -30 194 -077 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 11 -30 6/13/94 PER 12,720. 12,820. 8,782.22 8,784.5 11 -30 6/14/94 SL 12,792. 13,696. 8,784.09 8,760.24 11 -30 5/10/96 APF 12,500. 12,523. 8,758.12 8,760.43 11 -30 5/10/96 APF 12,523. 12,527. 8,760.43 8,760.85 11 -30 5/10/96 APF 12,527. 12,550. 8,760.85 8,763.42 11 -30 5/10/96 APF 12,602. 12,622. 8,770.16 8,772.87 11 -30 5/10/96 APF 12,622. 12,638. 8,772.87 8,775.07 11 -30 3/31/98 APF 12,432. 12,458. 8,751.22 8,754.12 11 -30 3/31/98 APF 12,400. 12,412. 8,746.59 8,748.47 11 -30 3/22/03 SPS 11,700. 13,696. 8,478.61 8,760.24 11 -30 7/1/03 SPR 11,700. 12,510. 8,478.61 8,759.1 11 -30 8/1/06 OH 12,180. 12,182. 8,691.23 8,691.84 411 11 -30 8/1/06 SPR 12,510. 13,696. 8,759.1 8,760.24 11 -30 4/15/09 BPS 12,701. 12,705. 8,781.31 8,781.53 11 -30 4/17/09 BPP 12,701. 12,705. 8,781.31 8,781.53 11 -30 6/7/10 BPS 12,690. 13,696. 8,780.63 8,760.24 11 -30 6/8/10 SQZ 11,665_ 12,690. 8,461.15 8,780.63 11 -30 4/19/11 SQZ ,665. IMMIllilala 8,461.15 8,780.63 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER ✓ BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN • OH OPEN HOLE • • 11 -30 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 4/12/20111T/1/0=2250/2300/0 Assist S -line w /load & MIT- IA PASSED to 3000 psi (Cement ;Squeeze) Pump 5 bbls neat meth 250 bbls crude down IA to load. pump 5.7 bbls crude down IA to reach test pressure IAP lost 80 psi 1st 15 min, 40 psi 2nd 15 min. FW HP's= 2550/500/0 S -line in control of well at departure. IA, OA =OTG Tags hung, DSO notified. s E 4/12/2011 ` ** *WELL S/I ON ARRIVAL"* *(pre sqz) _ ._.. SET SS- CATCHER SUB @ 4142' SLM I i PULL L -GLVS FROM STA #5 & #4. ;SET DUMMY GLV IN STA #5 & LRS LOAD IA WITH 250 BLLS OF CRUDE !SET DUMMY GLV IN STA #4. LRS MIT -IA TO 3000# (PASS) PULL EMPTY SS- CATCHER SUB FROM 4142' SLM ** *WELL S/I ON DEPARTUREW, DSO NOTIFIED * ** 4/17/2011CTU # 9 w / 1.75" ct : (Job scope Drift & IPROF & Cement squeeze) MIRU Prefrom weekly BOP test. RIH w/ 2.25" JSN / drift assembly, tag CBP @ !12678' ctm, flag pipe @ 12628', POOH. ** *Continued on 4/18/11*** 4/18/2011; CTU #9, 1.75" coil, 0.134" wall (Job Scope: drift, IPROF, cement squeeze) ** *Continued from 4-17-11*** ;Continue POOH. RIH w/ SLB IPROF logging toolstring, Log up & down passes @ 40 !/ 60 / 80 fpm. Preform stop counts and warm back passes.POOH. Download !memory data, log indicates previously squeezed liner holes (ai 11665' & 12180' are :leaking, plug (a7 12690' holding. ** *Continued on 4-19-11*** 4/19/2011'CTU #9, 1.75" coil, 0.134" wall (Job Scope: CEMENT SQUEEZE) ** *Continued ;from 4- 18 -11 * ** RIH w/ 2.50" DJN, cementing BHA. Pump 65 bbls of LARC squeeze cement. Held squeeze pressure of 3000 psi for 45 mins 13 bbls behind pipe. Clean out to 12690 ;top of plug .Freeze protect well w / 38 bbls of 60/40 Methanol. Left 530 psi on well «« Job complete »» • • • FLUIDS PUMPED BBLS 1238 2 %KCL 98 60/40 METH 100 BIOZAN 212 1% XS KCL 65 LARC SQUEEZE CEMENT TOTAL TREE= FMC ill SAFETY Nit: WELL ANGLE > 70* fri! 12134'. WELLHEAD = GIW ACTUATOR = BKR C : 1 1 -30 . '4-12" 1 ME MG' KB. _ 62.3' BT. db.( = _ K0P= 1253 Max A = _ 93 @ 13333' 1 1 ri -14-1/2" HES X NIP, ID = 3.813" . 1 Datum MD = 12975" Datum TVD = 8800' SS GAS LFT MANDRELS 1 13-3/8" CSG, 68#, NT-80, ID = 12.415" 11 3982' I--A ST MD 1VD DEV TYPE VLV LATCH PORT DATE 4 I-1 5 3076 2983 26 MMG DOME RK 16 04/24/111 4 4070 3790 r 41 IVAAG SO RK 20 04/24/11 3 7202 5819 ' 50 KBG-2 DMY BK 0 07/07/09 2 9494 7293 ' 55 KBG-2 DMY 91< 0 06/25/03 Minimum ID = 3.813" @ 2132' 1 11113 8162 56 KBG-2 DMY _ BK 0 06/25/03 4-112" HES X NIPPLE 1 1 1 11182' H41/2" HES X NIP, ID = 3.813" 1 11203' H9-5/8" X 4-1/2" BKR S-3 PKR 1 TOP OF 7" LNR H 11232' i 1 1 1 11228' 1-14-1/2" HES X NIP, ID = 3.813" 1 1 11249' 1-17" X 4-1/2" UNIQUE OVERSHOT 1 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" 11249' EC CI 11276' 1-1r X 4-1/2" BKR SA BL-3 PKR 1 1 1 11310' H4-1/2" OTLS X NP, ID = 3.813" 1 1 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 11 11322' I I 11322' H4-1/2" VVLEG, ID = 3.958" 1 1 9-5/8" CSG, 47#, NT-80S, ID = 8.681" H 11393' I--4 • L11336' H ELMD TT LOGGED 12/16/94 1 12663' HT X 4-1/2" T1W SS HIGH ANGLE HGR PKR I 12690' H41/7' HES OBSIDLAN BP (06/07/10) 1 000 1 1 4-1/2" LNR, 12.64, L-80, .0152 bpf, ID = 3.958" H nr2751 1-14-1/2" PORTED JOINT (41.49') 12792' I — 1 1 1 7" LNR, 26#, NT .0383 bpf, ID = 6.276" H 12825' I --A . , PERFORATION SUMMARY . . . REF LOG: MAD POROSITY ON 06/04/94 . . . . ANGLE AT TOP PERF: 88° "% (g 12797 . . . . Note: Refer to Production DB for historical perf data , . SEE SFf ' INTERVAL Opn/Sqz DATE . . 3-3/8" 6 12400 - 12412 ..' S 03/31/98 . , MEM - SA FEY CLAMP DIE 3-3/8" 6 12432 - 12458 S 03/31/98 FROM DOG COLLAR 3-3/8" 4 12500 - 12550 S 05/10/96 3-3/8" 4 12602 - 12638 S 05/10/96 3-3/8" 5 12720 - 12792 C 06/13/94 4-1/2" _ 32 12792 - 13696 SLOT 06/14/94 .... I 1 4-1/7' LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I 13719' j DATE REV BY' CONVENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/16/94 ORIGINAL COMPLETION 11/14/10 MJC/A GR GLV C/O (11/02/2010) WELL: 11-30 06/26/03 PH/KAK RWO 04/22/11 GJF/PJC GLV C/O (04/12/11) PERMIT No: r 1940770 06/27/03 CA 0/KK GLV C/O 04/27/11 MCM/PJC GLV C/O (04/24/11) API No: 50-029-22484-00 '12/15/04 MLH/TLH SAND PLUG REMOVED 7/2003 SEC 28, TI 1 N, R15E, 310.73' FEL & 2194.93' FNL 07/15/09 GJF/SV GLV C/O (07/07/09) 06/13/10 JKD/SV SET PLUG/GMT SQZ (06/07/10) i BP Exploration (Alaska) OPERABLE: Producer 11 -30 (PTD #1940770) Sustained IA Casing Pressure Above MOASP Page 1 of 2 • Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator @bp.com]�� • I11 Sent: Tuesday, March 15, 2011 3:13 PM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 DS Operators; AK, OPS PCC EOC TL; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; Cismoski, Doug A; Engel, Harry R; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Bommarito, Olivia 0; Daniel, Ryan Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Quy, Tiffany; Walker, Greg (D &C) Subject: OPERABLE: Producer 11 -30 (PTD #1940770) Sustained IA Casing Pressure Above MOASP All, Producer 11 -30 (PTD #1940770) passed a TIFI Qn 3/14/2011. The passing test confirms the presence of 2 barriers in the wellbore. The well is reclassified as Operable. Please call if you have any questions. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659 -5102 o) MAR 1 8 Zul' Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Sunday, March 13, 2011 6;05 PM To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 DS Operators; AK, OPS PCC EOC TL; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; Cismoski, Doug A; Engel, Harry R; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Bommarito, Olivia 0; Daniel, Ryan Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Quy, Tiffany; Walker, Greg (D &C) Subject: Producer 11 -30 (PTD #1940770) Sustained IA Casing Pressure Above MOASP All, Producer 11 -30 (PTD #1940770) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to SSV/2O4DTvac on 3711/2011. The well has been reclassified as Under Evaluation. The well may remain` online while work is conducted to attempt to restore integrity. Plan forward: 1. DHD: TIFL 2. WIE: Evaluate gas lift valve change out depending on results of TIFL. A TIO plot and wellbore schematic have been included for reference. Please call if you have questions or concerns. 3/15/2011 OPERABLE: Producer 11 -30 (PTD #1940770) Sustained IA Casing Pressure Above MOASP Page 2 of 2 • Thank you, • Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 3/15/2011 PBU 11 -30 PTD #1940770 3/13/2011 TIO Pressures Plot Well:11 -30 3,i i nn • -# Tbg —C IA 00A 000A On 1,000 01/15/11 01/22/11 01/29/11 02/05/11 02/12/11 02/19/11 02/26/11 03/05/11 03/12/11 • TREE= FMC WELLHEAD = • SAFETY NO1070 @ 12134' and 90° c• 12894'. WV I 1 30 ACTUATOR = BKR C - ***4-112 " CHROME 'TRW* KB. B_EV = 62.3' BF. ELEV = _ KOP = 1253' Max Angle = 93 @ 13333 I MEM 4-1/2" HES X NIP, ID = 3.813 Datum MD ; 12975"' Datum TV 0 = 8800' SS 13-318" CSG, 6 1 ST MD :- , NT-80, ID = 12.415" H 3982' 1 A GAS LIFT MANDRELS TV D DEV 'TYPE V LV LATCH PORT DATE 5 3076 2983' 26 NMG DOME RK 16 11/02/10 4 4070 3790 IF 41 IVIMG SO RK 20 11/02/10 3 7202 5819 ' 50 KBG-2 DMY BK 0 07/07/09 _ 2 9494 7293 '55 KBG-2 DAY BK 0 06/25/03 Minimum ID = 3.813" ( 2132' 1 11113, 8162 '56 KBG-2 DMY BK 0 06/25/03 4-1/2" HES X NIPPLE I 11182' H4-1/2" HES X NIP, ID = 3.813" i Z ■::: 11203' H9-5/8- X 4-1/2" BKR S-3 PKR I 11228' 4-1/2'' HES X NIP, ID = 3 813" 1 I H ITOP OF 7" LNR Ft 11232' I 1 11249' HUNIQUE OVERSHOT I 1 4-l/7' TBG, 12.6#, 13-CR, .0152 bpf, ID = 3,958" 11249' S * 11276' Hr X 4-1 BAKER SA BL-3 PKR I I i1310' H41/2" OT1S X NIP, ID = 3.813" I I 4-1/2" TBG, 12 6#, L-80, .0152 bpf, ID = 3.958" . 1 - 1 11322' I 1 11322' H4-112" TUBING TA L WLEG I I9-5/8" CSG, 47/ 8.681 11393' 1 • 11336' ELMD TT LOGGED 12/16/94 12663' HT X 4-1/2" TM/ SS I-IGH ANGLE HGR PKR 1 12690' I-14-1/2" HES OBSIDAN BP (06/07/10) I .... _....._ „„„-.....„.„, ... 12751' 4-1/2" PORTED Jouvr (41.49') I I 4-1/2" LNR, 12.6#, L-80, 0152 bpf, ID = 3.958" F-1 12792' — ITOP OF 4-1/2" LNR - SLTD H 12792' I 1 1 1 1 7" LNR, 26#, NT-80, .0383 bpf, ID = 6.276" 12825' .1, • PERFORATION SUMMA RY ' S , s REF LOG: MID POROSITY ON 06/04/94 • • ' ANGLE AT TOP PERF: 88° (II 12797 ' , ' , , Note: , Refer to Production DB for historical perf data , • • • SIZE SPF INTERVAL Opn/Sqz DATE , , 3-3/8" 6 12400 - 12412 S 03/31/98 • 13714' SAFETY CLAMP DIE 3-3/8" 6 12432 - 12458 S 03/31/98 BTM OF 4-1/2" --I 13696' s FROM DOG COLLAR 3-3/8" 4 12500 - 12550 S 05/10/96 13-CR LNR 3-3/8" 4 12602 - 12638 S 05/10/96 . TOP OF 4-1/2" LNR 13696' 3-3/8" 5 12720 - 12792 C 06/13/94 4-1/2" 32 _ 12792 - 13696 SLOT 06/14/94 1 4-112 ' LNR, 12 6#, L-80, .0152 bpf, ID = 3.958" I-1 13719' DATE 'REV BY' COMMENTS DATE - REV BY COMMENTS PRUDHOE BAY UNIT 06/16/94 ORIGtNAL COMPLETION 11/14/10 MJC/AGR GLV CJO (11/02/2010) WELL: 11-30 06/26/03 PHIKAK RWO PERMIT No: 1940770 06/27/03 CAO/KK GLV 0/0 API No: 50-029-22484-00 12/15/04 MLI-VTLH SAND PLUG REMOVED 7/2003 SEC 28, T11N, RISE, 310.73' FEL & 2194.93' FM 07/15/09 GJF/SV GLV 0/0 (07/07/09) 06/13/10 JKD/SV SET PLUG/CMT SQZ (06/07/10) . :• • Exploration (Alaska) STATE OF ALASKA ALASK~L AND GAS CONSERVATION COMMIS N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other 0 CEMENT Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ SQUEEZE Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter~Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: . Permit to Drill Number: Name: Development Q Exploratory ^ 194-0770 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-22484-00-00 8. Property Designation (Lease Number) : 9. Well Name and Number ADLO-028321 PBU 11-30 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 13719 feet Plugs (measured) None feet true vertical 8759.48 feet Junk (measured) 13714 feet Effective Depth measured 13719 feet Packer (measured) 11203 11276 true vertical 8759.48 feet (true vertical) 8212 8252 Casing Length Size MD TVD Burst Collapse Structural Conductor 76 20" SURFACE - 110 SURFACE - 110 Surface 3947 13-3/8" 68# NT-80 SURFACE - 3982 SURFACE - 3723 5020 2270 Intermediate 11361 9-5/8" 47# NT-80S SURFACE - 11393 SURFACE - 8317 6870 4760 Production Liner 1593 7" 26# NT-80 11232 - 12825 8228 - 8785 7240 7020 Liner 1066 4-1/2" 12.6# L-80 12653 - 13719 8777 - 8759 8430 7500 Perforation depth: Measured depth: 12720 - 12820 12720 - 12792 _ True Vertical depth: 8782.22 - 8784.5 8782.22 - 8784.09 Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13-CR SURFACE - 11253 SURFACE - 8240 4-1/2" 12.6# L-80 11247 - 11322 8236 - 8278 Packers and SSSV (type, measured and true vertical depth) 9-5/8"X4-1/2" BKR S-3 PKR 11203 8212 7"X4-1/2" BAKER SABL SA-3 PKR 11276 8252 Q~/!~1 V L~.D 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~UN 2 ~' ~O~Q Treatment descriptions including volumes used and final pressure, d~,j, ~~:~{ ~ ~~ ~` A,Iaska lei ~ a~ ~~~' ~~~ISSIOtI 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 6/28/2010 r Vllll IV-YVY IIGVpGV //LVVJ N fA v"• ~I~! 11-30 194-077 PERF OTTA['_HMFNT • LJ Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 11-30 6/13/94 PER 12,720. 12,820. 8,782.22 8,784.5 11-30 6/14/94 SL 12,792. 13,696. 8,784.09 8,760.24 11-30 5/10/96 APF 12,500. 12,523. 8,758.12 8,760.43 11-30 5/10/96 APF 12,523. 12,527. 8,760.43 8,760.85 11-30 5/10/96 APF 12,527. 12,550. 8,760.85 8,763.42 11-30 5/10/96 APF 12,602. 12,622. 8,770.16 8,772.87 11-30 5/10/96 APF 12,622. 12,638. 8,772.87 8,775.07 11-30 3/31/98 APF 12,432. 12,458. 8,751.22 8,754.12 11-30 3/31/98 APF 12,400. 12,412. 8,746.59 8,748.47 11-30 3/22/03 SPS 11,700. 13,696. 8,478.61 8,760.24 11-30 7/1/03 SPR 11,700. 12,510. 8,478.61 8,759.1 11-30 8/1/06 OH 12,180. 12,182. 8,691.23 8,691.84 11-30 8/1/06 SPR 12,510. 13,696. 8,759.1 8,760.24 11-30 4/15/09 BPS 12,701. 12,705. 8,781.31 8,781.53 11-30 4/17/09 BPP 12,701. 12,705. 8,781.31 8,781.53 11-30 6/8/10 SQZ 12,690. 13,696. 8,780.63 8,760.24 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 11-30 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 6/6/2010 CTU #9 w/ 1.75" CT: Job Scope: Cement Squeeze for GSO: MIRU CTU & perform weekly BOP Test. MU and RIH with 3.80" crayola mill milling BHA to tubing stub and mill damaged tubing. Taa tubina stub at 11.263' ctmd and !,start milling. Milled obstruction clean and dry drifted 5 passes clean. RIH to 12,800' to drift for Composite Plug. crayola mill no-go'ed at 2.75", go at 2.76". MU and RIH with SLB memory GR/CCL for coil flag. **"Job Continued on 07 June 10*** *""Witnessed BOP Test*** 6/7/2010; CTU #9 w/ 1.75" CT: Job Scope: Cement Squeeze for GSO: Continued from '06 June 10. Continue RIH with memory GR/CCL. Sat down in 4 1/2" liner at 12729'. Lo from 12729' to 12000' ctmd. OOH w/ good data, correct depth +10'. MU HES Composite Plug and RIH. At flag correct depth to "top of plug" and RIH to setting depth. Ball landed on seat at 33 bbls and sheared at 2584psi. PU and tagged plug w/ 2k down and POOH. OOH tools shifted and Iball recovered. Cut pipe for chrome management. MU cementing BHA and prepare for cement squeeze. *"*Job Continued on 08 June 10*** 6/8/2010 CTU #9 w/ 1.75" CT: Job Scope: Cement Squeeze for GSO: Continued from 07 June 10. Displaced well with KCL, top with diesel to achieve --100psi WHP. Taa composite I{~ug and corrected depth to top of plus at 1269Q'. neat), lay in cement, 20 bbls behind pipe, leaving 2.7 bbls to hesitate with before losing cement past top hole in casinca at 11.665'. Discussed hesitation with APE before trying to achieve 1000 psi squeeze pressure. Not able to achieve squeeze pressure after hesitation, dropped ball and cleaned out wtf' CMT to formation but infectivity to tight. Established 1:1 returns, FCO to surface and POOH. FP well from 2500' with 38 Bbls 50/50 McOH. RDMO coiled tubing unit. ***Job Complete*** FLUIDS PUMPED BBLS 15.8 LARC CEMENT 100 B I OZAN 150 FRESH 100 DIESEL 580 1 %KCL 310 1 % XS KCL 173 50/50 MEOH 1428.8 Total i K~ , - rmv WELLHEAD = CNV ~ ACTUATOR = BKR C KB. ELEV = 62.3' BF. ELEV = KOP = 1253' Max Angle = 93 @ 13333' Datum MD = 12975' Datum TV D = 8800' SS SAFETY N : 70° @ 12134' and 90° @ 12894'. ~,' O ***4-1/2" CHROMETBG"** ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3076 2983 26 MMG DMY RK 0 07/07/09 4 4070 3790 41 MMG DMY RK 0 07/07/09 3 7202 5819 50 KBG-2 DMY BK 0 07/07/09 2 9494 7293 55 KBG-2 DMY BK 0 06/25/03 1 11113 8162 56 KBG-2 DMY BK 0 06/25/03 11336' ELMD TT LOGGED 12/16/94 I I LIYI ~, GVK, IY I-V V, .VJVJ V~.ll, IU ~ V.G(V I -' ILVLJ I ~ I PERFORATION SUMMARY ~ . ~ ` , , REF LOG: MWD POROSITY ON 06/04/94 ` ~ ` ANGLE AT TOP PERF: 88° @ 12792' ~ . ~ Note: Refer to Production DB for historical perf data ~ ~ ` ~ , SIZE SPF INTERVAL Opn/Sqz DATE ` ` ~ 3-318" 6 12400 - 12412 S 03/31 /98 ,,, ` 3-318" 6 12432-12458 S 03/31/98 BTN10F4-1/2" 13696' 3-3(8" 4 12500 - 12550 S 05/10/96 13-CR LNR 3-3/8" 4 12602 - 12638 S 05/10/96 TOP OF 4-1 /2" LNR 13696' 3-3/8" 5 12720 - 12792 C 06/13/94 4-1/2" 32 12792 - 13696 SLOT 06/14/94 ~ 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I 4~-jSAFEN CLAMP DIE I FROM DOG COLLAR I 13719' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 06/16194 ORIGINAL COMPLETION 06126/03 PWKAK RWO 06/27/03 CAO/KK GLV C/O 12!15/04 MLIiiTLli SAND PLUG REMOVED 7/2003 07/15!09 GJF/SV GLV C/0 (07/07/09) 06/13/10 JKD/SV SET PLUG/CMT SOZ (06107!10) PRUDHOE BAY UNIT WELL: 11-3p PERMIT No: 1940770 API No: 50-029-22484-00 SEC 28, T11 N, R15E, 310.73' FEL & 2194.93' FNL BP Exploration (Alaska) osiosios r~ ~~ S~b~q~epge~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Bivd. Job # ~, ~ ~ ~IUN ~. ~ 203 r~s i~ (~s Gay. t~~mtnissio~ ~C9~`1t-f(~~S Log Description o ' ~a '1~v b ' ~' iw..r ~`' .i C7 ~ l1 i1 ~ NO.5271 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 04/14/09 Schl~umber~er Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth . ; . ~i. ~3,~i ,-...Wl ~ ~.~' ~ ens U U N0.5188 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wnll I..h x ;~... _ d,';r:s ,~~h~s W-18 11968978 RST -~ ware 12/22/08 na_ 1 GOIOr GD 1 07-02B AXED-00013 MCNL 02/12/09 1 1 K-05C AWJB-00016 MCNL 12/30/08 1 1 F-18A AYLF-00020 CEMENT IMAGE LOG ~ J ~- 03/19/09 1 1 J-09A AP3O-00024 STP CROSS FLOW CHECK c ~ ~ ~ 03/25/09 1 1 X-05 AYTO-00014 PFCS CALIPER LOG) _ t 04/09/09 1 1 0-04A AYTU-00023 _ LDL & PLUG SET j~5 _ ~ 04/02/09 1 1 04-40 AYTU-00025 USIT g ~- 04/10/09 1 1 06-14B AVYO-00021 SCMT _ 04/01/09 1 1 Z-01 B AVYO-00025 INJECTION PROFILE - /p "~}~ 04/11/09 1 1 L3-15 AYTU-00023 ~ _ . PRODUCTION PROFILE ~ 04/06/09 1 1 ti-30 AXBD-00021 MEM PROD PROFILE I c _ ~. ~ 04/14/09 1 1 3-03/J-33 AZ4D-00013 RST W/INJ PROFILE - / - ~ a 04/05/09 1 1 3-17F/K-30 BIJJ-00006 MEM INJECTION PROFILE - (~ / 04/03/09 1 1 3-49A/M-40 AXBD-00019 MEM INJECTION PROFILE: 04/07/09 1 1 V-114A ~L~iU ~~- ~ AVY500032 INJECTION PROFILE ~ 1~-~~b -- 04/02/09 1 1 L - -- i U I -~. THESE 2 WELLS WERE DELIVERED SEPARETLY TO MEET COMPLIANCE TRANS # 5185 E-36A AYTU-00006 OH MWD/LWD EDIT (IFLEX) j _~- ~-~9 01/14/09 1 1 MPS-43 AXML-00020 OH LDWG EDIT 12/29/08 2 1 PLEASE ACKNOWLEDGE RE CEIPT Rv clr:nl wn enln oc~rnon~u~n nw~~ cnmv ~,,..~. r.._ BP Exploration (Alaska) Inc. __ • -`"°~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 838 ATTN: Beth Received by: 1 ~J Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth 11/11/03 NO. 3039 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job # Log Description Date Blueline Color Prints CD D.S. 7-06A ~(~_~-jq ~ 10564479 SCMT 06/06/03 ,-o~~q~~~~,-.~~ ~o.~.~ ~,us,~ ~o,~,o~ D.S. 11-30 ~ 0559806 USlT 06123/03 ~-~ ~z~ ,o--- s~ o~,o~,o~ F-26A 40568459 SCMT 06/07/03 D.S. 15-23A ~ ~ ~ ~'~ 10559821 SCMT 07/26/03 ..'.,~.~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: .. BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Dar&' EJ~ii~ered:' ' RECEIVE NOV 24 Z00~ Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth {" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 62.4' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 1185' NSL, 383' WEL, SEC. 28, T11N, R15E, UM X = 707135, Y = 5952899 11-30 At top of productive interval 9. Permit Number / Approval No. 194-077 2026' NSL, 3915' WEL, SEC. 21, T11N, R15E, UM X = 703422, Y = 5958920 10. APl Number At effective depth 50-029-22484-00 2557' NSL, 4474' WEL, SEC. 21, T11N, R15E, UM X = 702848, Y = 5959437 11. Field and Pool At total depth Prudhoe Bay Field / Prudhoe Bay 3083' NSL, 312' WEL, SEC. 20, T11N, R15E, UM X = 701715, Y = 5959932 Pool 12. Present well condition summary Total depth: measured 13719 feet Plugs (measured) Sand Plug cleaned out to 12480' (07/03) true vertical 8759 feet Effective depth: measured 12480 feet Junk (measured) true vertical 8756 feet Casing Length Size Cemented MD TVD Structural Conductor 76' 20" 260 sx Arcticset (Approx.) 110' 110' Surface 3947' 13-3/8" 1561 sx CS III, 375 sx Class 'G' 3982' 3723' Intermediate 11361' 9-5/8" 775 sx Class 'G' 11393' 8317' Production Liner 1593' 7" 285 sx Class 'G' 11232' - 12825' 8228' - 8785' Liner 1066' 4-1/2" Uncemented Slotted Liner 12653'- 13719' 8777'- 8759' Perforation depth: measured 12400'- 12412', 12432'- 12458', 12500'- 12550', 12602'- 12638', 12720'- 12792' Slotted Section: 12792' - 13696' true vertical 8747' - 8748', 8751' - 8754', 8758' - 8763', 8770' - 8775', 8782' - 8784' Slotted Section: 8784'- 8760' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr80 to 11253'; 4-1/2", 12.6#, L-80 11247'- 11322' Packers and SSSV (type and measured depth) 4-1/2" Baker 'SABL-3' packer at 11276'; 4-1/2" Baker 'S-3' packer at.11203'; 4-1/2" HES 'X' Nipple at 2132' ~'"'~i,~ ~,' ...... ~?',.~ ~r-,-~ r.~ '~1' ~f ~ I~' ~ ="i'3. Stimulation or cement squeeze summary ~'~ ~' '~'~ '''~'~' ~'' ,~, "' '~" Intervals treated (measured) JUL ~;t ~'~ ..~ ,~, ~ ~.003 Treatment description including volumes used and final pressure ~,, ~ ~, .. ' ...... ~ ~., .., · · 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1,505 45,007 238 Subsequent to operation: 617 27,538 1,303 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ~, Title Technical Assistant Date - . . - " Prepared By Name/Number: Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 BFL Submit In Duplicate Well: 11-30 RWO Accept: 06/20/03 Field: Prudhoe Bay Unit Spud: N/A APl: 50-029-22484-00 Release: 06/25/03 Permit: 194-077 Rig: Nabors 4ES Date PRE-RIG WORK 05/24/03 T/I/O = SI/2000/0 PPPOT-T PASSED PRESSURE TEST VOID TO 5000 PSI, LOST 100 PSI IN 30 MINS - GOOD TEST. ALL LDS FUNCTIONED. PPPOT-IC PASSED PRESSURE TEST VOID TO 3200 PSI, LOST 100 PSI IN 30 MINS - GOOD TEST. ALL LDS FUNCTIONED. 06/06/03 TIO = 2160/2240/VAC OA FL PRE RIG. OA FL NEAR SURFACE. 06/09/03 T/I/O= 2150/2000/300. (PREP FOR CMIT). IA FL @ 9686' (STA Ct 4). TBG FL @ 9498'. WELL AND AL SI. T/I/O=2200/2140/0. MITOA FAILED TO 2000 PSI. (PREP FOR RWO). PRESSURED OA TO 2000 PSI WITH 9 BBLS OF CRUDE. OA LOST 200 PSI IN FIRST 15 MINUTES. REPEATED TEST 5 MORE TIMES WITH SAME RESULTS. COULD NOT ESTABLISH LLRT. THE LEAK IS TO SMALL FOR PUMP TRUCK. BLED OA BACK TO 0 PSI. FINAL WHP'S=220/2140/0. 06/13/O3 ATTEMPT TO CHEMICAL CUT TUBING AT 11247' - DEPTH REFERENCED TO TUBING TALLY. DID NOT TAG. SHOT 2 - 40 GRAIN STRAND STRING SHOT FROM 11236'-11248' PRIOR TO RIH W/ 3.625" CHEM CUT. UNABLE TO GET CHEMICAL CUTTER BELOW X NIPPLE AT 11185'. POOH. ON SURFACE FIND CHEMICAL CUTTER WITH GEMCO CENTRALIZER SLID DOWN ON CHEMICAL CYLINDER. RIG BACK FOR THE NIGHT AND PAD OPERATOR NOTIFIED WELL LEFT SHUT IN. WILL BE BACK IN MORNING TO TRY A 3-3/8" SEVERING HEAD. 06/14/03 ATTEMPT TO CHEMICAL CUT TUBING AT 11247'- DEPTH REFERENCED TO TUBING TALLY. UNABLE TO GET 3-3/8" CHEMICAL CUTTER THROUGHT THE X NIPPLE AT 11215'. TEMPORARILY STUCK, BUT ABLE TO WORK FREE. RIG DOWN. CHEMICAL CUTTER SEVERING HEAD MARKED UP, MORE ON THE UP SIDE. PAD OPERATOR NOTIFIED WELL LEFT SHUT IN. 06/15~O3 DRIFTED W/3.70 CENT, 4 1/2" BRUSH, SAMPLE BAILER, SAT DOWN @ 11229' SLM, WORK TO 11,259' SLM, BAILER -- CAME BACK W/SAND, BRUSH HAD PLASTIC DEBRIS IN BRISTLES (LOOKED LIKE OILY WASTE BAG PIECES). RAN 4 PRONG WIRE GRAB W/CENTER SPEAR, W/ 3.625 CENT, SAT DOWN @ 11267' SLM, WORKED TO 11304' SLM. CAME BACK W/NOTHING. LEFT WELL SHUT IN. 06/16/O3 ATTEMPT 3.375" CHEMICAL CUT TUBING AT 11247" - IN MIDDLE OF FIRST FULL JOINT ABOVE PACKER. DEPTH REFERENCED TO TUBING TALLY. STRINGSHOT FROM 11236'-11248' FIRED ON 6/13/2003. CHEMICAL CUTTER EXPLOSIVES FIRED APPARENTLY LOW ORDER. RIG BACK FOR THE NIGHT, PAD OPERATOR NOTIFIED WELL LEFT SHUT IN. 11-30 Rig Workover Page 2 06/17/03 T/I/O=2200/2280/240 TBG FL @ 10060'. IA FL @ 9990' (BETWEEN ST. #4 & #5). FOR E/L. ATTEMPT 3.375" CHEMICAL CUT TUBING AT 11247" - IN MIDDLE OF FIRST FULL JOINT ABOVE PACKER. DEPTH REFERENCED TO TUBING TALLY. STRINGSHOT FROM 11236'-11248' FIRED ON 6/13/2003. CHEMICAL CUTTER RUN WITH TWO GEMCOS ON CHEMICAL CYLINDERS, BOWSPRING CENT BELOW SEVERING HEAD. ELINE JARS RUN, CUT IN SEA WATER. CHEMICAL CUTTER EXPLOSIVES FIRED APPARENTLY LOW ORDER. RIG BACK FOR THE NIGHT, PAD OPERATOR NOTIFIED WELL LEFT SHUT IN. 06/18/03 T/I/O=920/1840/280 TBG FL AT SURFACE. IA FL AT 7200' (BETWEEN ST. #1 & #2). FOR E/L. 3.375" CHEMICAL CUT TUBING AT 11247"- IN MIDDLE OF FIRST FULL JOINT ABOVE PACKER. DEPTH REFERENCED TO TUBING TALLY. STRINGSHOT FROM 11236'-11248' FIRED ON 6/13/2003. CHEMICAL CUTTER RUN WITH TWO GEMCOS ON CHEMICAL CYLINDERS, BOWSPRING CENT BELOW SEVERING HEAD. ELINE JARS RUN, CUT IN SEA WATER. PAD OPERATOR NOTIFIED WELL LEFT SHUT IN. WELL CIRC-OUT, T/I/O=1950/1800/200 PUMPED 5 BBLS NEAT AND 200 BBLS 1%KCL, LET GAS SWAP FOR 1 HR, PUMP 204 BBLS 1% KCL LET GAS SWAP FOR 1 HRS. 06/19~O3 CIRC OUT WELL. PUMP 625 BBLS 1%KCL DOWN TBG TAKING RETURNS UP IA, U-TUBE 180 BBLS DIESEL TBG TO IA, FREEZE PROTECT FLOWLINE W/4 BBLS DIESEL, FINAL WHP-0/0/300. DRIFT TO 2019' W/3.84 G-RING.( SSSV NIPPLE). SET HOLD OPEN SLEEVE @ 2019' SLM (72" LONG, 4-1/2" G-FISH NECK, 3.85" NO-GO, 3.638" BARREL, 3.095" ID, 1/4" SLIT IN PIPE OVER THE TOTAL LENGTH). LEFT WELL SHUT IN. BP EXPLORATION Page I of 3 Operations Summary Report Legal Well Name: 11-30 Common Well Name: 11-30 Spud Date: 5/22/1994 Event Name: WORKOVER Start: 6/20/2003 End: 6/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations 6~20~2003 06:00 - 07:00 1.00 MOB P PRE Scope down & lower derrick. 07:00 - 07:30 0.50 MOB P PRE Move rig back off well.. Clean location. 07:30 - 13:30 6.00 MOB P PRE Move rig from F pad to DS 11. 23 mile move. 13:30 - 16:00 2.50 RIGU P PRE Spot in sub over well # 30. spot in pits & pipe shed. Spot rig camp. 16:00 - 17:00 1.00 RIGU P PRE Raise & scope derrick. 17:00 - 18:30 1.50 RIGU P DECOMP Accept Rig @ 1700 Hrs, 6/20/2003. R/U lines to tiger tank & x-mas tree. Take on seawater. 18:30 - 19:00 0.50 WHSUR P DECOMP M/U lubricator & pull BPV. LID lubricator. 19:00 - 19:30 0.50 WHSUR P DECOMP Pressure test lines to tree to 3500 psi, OK. 19:30 - 20:00 0.50 KILL P DECOMP Hold Pre-spud & PJSM. 20:00 - 23:00 3.00 KILL P DECOMP SITP 50#, SICP 10#. Open well & circulate out diesel. 6 BPM @ 500 psi. Well taking fluid (sand plug), took 34 bbls to begin getting returns. Circulated entire well volume 775 bbls. Small amont of gas. Recovered 180 bbls diesel. Diesel was strung out, indicating holes in tbg. Observe well. 23:00 - 23:30 0.50 WHSUR P DECOMP Blow down lines. Set TWC & test to 900 psi, OK. 23:30 - 00:00 0.50 WHSUR P DECOMP N/D X-mas tree & adapter flange. 6/21/2003 00:00 - 00:30 0.50 WHSUR P DECOMP Finish N/D X-mas tree & adapter flange. 00:30 - 01:00 0.50 WHSUR P . DECOMP Clean hanger threads. Check x-over threads, run in 5 turns into hanger, OK. Cut & cap control lines. 01:00 - 02:30 1.50 BOPSUF.P DECOMP N/U BOPE. 02:30 - 03:00 0.50 BOPSUF.P I DECOMP Clear & clean cellar area. R/U to test BOPE. 03:00 - 06:00 3.00 BOPSUF.P DE[COMP Pressure test BOPE[. Test Rams, valves, choke manifold, annular & kelly, LP 250#, HP 3500#. Test koomey. Right to witness waived by AOGCC... J. Spaulding. 06:00- 07:00 1.00 WHSUR P DECOMP PJSM. PU lubricator. Pull TWC. LD same. 07:00 - 07:30 0.50 PULL P DE[COMP PU Landing Jt and XO. MU in Tbg Hanger. BOLDS. 07:30 - 08:00 0.50 PULL P DECOMP Pull Hanger to floor. Hanger broke free at 145K. Hanger pulling free at 124K string weight. LD Hanger and Landing ,It. 08:00 - 10:00 2.00 PULL P DECOMP Finish RU SWS/Camco Spooling Unit. Start POOH 4 1/2" L-80 Completion and Controll line to SSSV. 10:00 - 10:30 0.50 PULL P DI=COMP LD SSSV. Recovered all 56 bands. RD Spooling Unit. 10:30 - 16:30 6.00 PULL P DECOMP Finish POOH with 4 1/2" Completion as follows: 288 Jts and a 21.21' Cut-Off Jt. Also recovered SSSV and Flow Couplings, 6 GLMs, and 1 X-Nipple. Clemical Cut was clean cut...inside of cut was smooth. Condition of Tbg from Jt #178 to the Cut-off Jt had small holes in almost every joint. 16:30 - 18:00 1.50 PULL P DECOMP RD 4 1/2" handling equipment. C&C Floor. 18:00 - 19:00 1.00 CLEAN P DECOMP M/U & install wear bushing. Strap DCs. Hold PJSM. 19:00-20:30 1.50 CLEAN P DECOMP P/U BHA#1. Mill/DressingAssy& RIH. Mill, 1 DC, Csg Scraper, 2 Junk Baskets, Bumper sub, Jars & 6 DCs. 20:30 - 00:00 3.50 CLEAN P Dr:COMP P/U 3 1/2" DP lxl & RIH. RIH w/180 Jts @ midnight. 6/22/2003 00:00 - 03:30 3.50 CLEAN P DECOMP Con't to P/U 3 1/2" DP lxl & run in hole. Ran 345 jts. 03:30 - 04:30 1.00 CLEAN P DECOMP P/U kelly & break circulation. Tag up on top of tbg stub (~ 11251'. Did not see TOL. Rotate & mill down to 11258'. Work up & down, polish stub. P/U 164K, S/O 115K ROT 136K. 210 Stks, PP 1100 psi, Torq 5K, WOB 0-2K, 40 Rpms. Did not see increase in pump pressure. Csg Scraper @ 11216'. 04:30 - 05:00 0.50 CLEAN P DECOMP Mix sweep & Dirt Magnet. R/U to reverse circ. 05:00 - 06:00 1.00 CLEAN P DECOMP Reverse circulate as follows: Pump 25 Bbl Hi-Vis sweep, followed by 50 Bbls of Dirt Magnet & 25 Bbl Hi-vis sweep. Start to displace hole w/Clean seawater. Crew change. Printed: 6/30/2003 1:52:46 PM BP EXPLORATION Page 2 of 3 Operations Summary Report Legal Well Name: 11-30 Common Well Name: 11-30 Spud Date: 5/22/1994 Event Name: WORKOVER Start: 6/20/2003 End: 6/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From- To Hours Task Code NPT Phase DescriptiOn of Operations 6/22/2003 06:00 - 09:30 3.50 CLEAN P DECOMP PJSM. Continue to reversed circulate 750 bbls at 5 bpm/1100 ~si. Returns clean. 09:30- 10:00 0.50 CLEAN P DECOMP Set back Kelly. Blow down lines. 10:00- 14:00 4.00 CLEAN P DECOMP TOH with 3 1/2" Drill Pipe (345 Jts). Stand back in Derrick. 14:00- 15:30 1.50 CLEAN P DECOMP LID BHA#1 15:30 - 17:00 1.50 CLEAN , P DECOMP Clean out boot baskets. Clear & clean rig floor. 17:00 - 17:30 0.50 EVAL P DECOMP :P/U RTTS to test casing. 17:30 - 21:00 3.50 EVAL P DECOMP RIH w/RTTS on 3 1/2" DP. P/U additional 7 singles. 21:00 - 23:00 2.00 EVAL P DECOMP Set RTTS @ 11215'. Test lines to 3500#, OK. Close rams & pressure up annulus to 3500 psi & test casing. Hold pressure for 30 min, tested good. Recored entire test. 23:00 - 00:00 1.00 EVAL P DECOMP Bleed off pressure. P/U & unset packer. Packer tight. Open by-pass. Pull on packerin 5k increments to 170K. (23K overpull) Packer came free. Still dragging. Work pipe. 6/23/2003 00:00 - 02:00 2.00 EVAL P DECOMP Work pipe & lock by-pass open. Pull 2 singles, no dragging or swabbing. Pull 5 more singles slowly & insure proper fill. now have normal P/U weight. 02:00- 06:00 4.00 EVAL P DECOMP POOH & LID 3 1/2" DP. LID 226 Jts. Crew change. 06:00 - 08:00 2.00 EVAL P DECOMP PJSM. Finish TOH and stand back 42 stds of 3 1/2" Drill Pipe. Total Jts = 352. 08:00 - 08:30 0.50 EVAL P DECOMP LD RTTS Pkr. Small amount of rubber missing from lower element. 08:30- 10:00 1.50 EVAL P DECOMP C&C Floor. RU SWS. PJSM. 10:00- 17:30 7.50 EVAL P DECOMP Run Schlumberger USITIog from 11220to4000'. Load &tally 4 1/2" completion string. Discuss Log results with Anchorage Engineering. 17:30 - 18:30 1.00 EVAL P DECOMP R/D E-line equip. Clear rig floor. 18:30 - 22:00 3.50 CLEAN P DECOMP M/U muleshoe & 3 1/2" DP & RIH w/remaining 42 stands. POOH & L/D all 3 1/2" DP. 22:00 - 22:30 0.50 RUNCOI~P COMP Pull & L/D wear bushing. 22:30 - 23:30 1.00 RUNCOr~' COMP Clear & clean rig floor. R/U torque turn & tubing running equip. 23:30 - 00:00 0.50 RUNCOr~ COMP Hold PJSM. 6/24/2003 00:00 - 06:00 6.00 RUNCOI~ COMP Start RIH w/completion tail pipe assy. P/U & RIH w/4 1/2" 12.6#, 13Cr 80, Vam Ace tubing. 06:00 - 15:00 9.00 RUNCOI~ COMP Continue in hole w/4 1/2" completion string, torquing all connections to 3620 ft / lbs. 262 jts run. 117K up wt, 91K down wt. 15:00 - 16:30 1.50 RUNCOI~ COMP Space out:While pumping 2 bpm @ 100 psi.Take weight, (3-4K), 23' in on #263 & stack outw/15K, 29' in on #263. No significant pressure increase. Do it again while pumping 3 bpm / 100 psi. See 50 psi pressure increase 23' in, (top of stub) Locate out w/no further pressure increase. LID # 263 & #262 & add (1) space out pup, (2.15'), & bury under jt # 262. M/U hanger & landing jt. 16:30 - 21:30 5.00 RUNCOI~' COMP Reverse circulate @ 3 bpm / 100 psi, 250 bbls clean seawater followed by 600 bbls heated seawater w/corrosion inhibitor. 21:30 - 22:00 0.50 RUNCOI~ COMP Land tubing string. RILDS. L/D landing Jt. 22:00 - 22:30 0.50 RUNCOI~ COMP Drop ball/rod. Pressure test lines to set packer. 22:30 - 00:00 1.50 RUNCOI~ COMP Pressure up to 3500 psi & set packer. Hold pressure for 30 min, tested OK. Bled off tbg pressure to 1500 psi. Pressure up annulus to 3500 psi & test tbg/csg annulus for 30 min, tested OK. Bled off tbg pressure & shear RP valve. Good shear indication. Equalize & bleed off all pressures to 0. Charted Printed: 6/30/2003 1:52:,46 PM BP EXPLORATION Page 3 of 3 Operations Summary Report Legal Well Name: 11-30 Common Well Name: 11-30 Spud Date: 5/22/1994 Event Name: WORKOVER Start: 6/20/2003 End: 6/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations 6~24~2003 22:30 - 00:00 1.50 RUNCO~ P COMP complete test. 6~25~2003 00:00 - 00:30 0.50 WHSUR P COMP Install TWC & test same to 1000 psi. Blow down lines. 00:30 - 02:00 1.50 BOPSUF P COMP N/D BOPE. 02:00 - 03:30 1.50 WHSUR P COMP N/U adapter flange & X-mas tree.. Test to 5000 psi, OK. 03:30 - 04:30 1.00 WHSUR P COMP Clean cellar area. R/U lines to tree & test. 04:30 - 06:00 1.50 WHSUR P COMP Freeze protect well w/150 Bbls diesel, pumping 3 bpm @ 450 psi. 06:00 - 08:00 2.00 WHSUR P COMP U-tube diesel, set BPV, secure well. Rig released @ 08:00 hrs. Printed: 613012003 1:52:46 PM Well: 11-30 RWO Accept: 06/20/03 Field: Prudhoe Bay Unit Spud: N/A APl: 50-029-22484-00 Re lease: 06/25/03 Permit: 194-077 Rig: Nabors 4ES Date POST RIG WORK 06/27/03 PULL BALL AND ROD. PULL STA 3, 1" DGLV, BK. SET STA 3, 1" OGLV. PULL STA 5, I 1/2 DCR SHEAR VLV. PULL STA #4 @ 4053' SLM. SET I 1/2" DGLV @ 3062' SLM. (STA #5). INSTALL GENERICS IN STA #3,4. PULL 4 1/2" RHC PLUG @ 11,210' SLM. DRIFT W/3.65" CENT W/TEL & SAMPLE BAILER. 06/28/03 DRIFT TBG W/3.65" CENT W/TEL & SAMPLE BAILER. S/D @ 11,237' SLM. WORK TO 11,241' SLM. 3.45 CENT WOULD NOT PASS THROUGH 11241' . BUT 2.805" CENT WENT TO 11252'. RAN 3.7 LIB TO 11241'. HALF ROUND CUT ON LIB INDICATES OVERSHOT DID NOT GET OVER CUT TBG. RAN 3.25 CENTRALIZER, SAMPLE BAILERTO 11257'. NOT SEEING SPANGS. NOTHING IN BAILER. RAN 2.9 SWAGE TO 11253'. RAN 2.045 CENT TO 11253'. RAN 2.5" LIB. WOULD NOT PASS RESTRICTION @ 11,241' SLM. SHORTEN TOOL STRING & RUN 2.045" CENT W/SAMPLE BAILER TO 11,612' SLM. BAILER CAME BACK EMPTY. RDMO. WELL LEFT SHUT IN. 07/01/03 OPEN WELL AND RIH. UNABLE TO GET THROUGH RESTRICTION @ 11,270'. POOH AND CHANGE BHA TO 1.75" NOZZLE AND 142" ON 1.75" STINGER. RIH AND TAG TOP OF SAND AT 11705' CTMD, REVERSE OUT TO TOP OF PERFS AT 12,400', LOSSES APPROACHING 50%. SWAP TO THE LONG WAY, CLEAN OUT TO 12480', LOSSES -10%. CHASE UP TO TAIL PIPE. BIOZAN NOT CARRYING SAND TO SURFACE. POOH AT 80% JETTING ACROSS THE MANDRALS. LEFT ~ 23 BBLS OF SAND IN TUBING. NOTIFIED FS20TL ON TAKING BACK SAND TO PLANT. NOTIFIED DSO TO POP WELL. JOB COMPLETED. .~- STATE OF ALASKA ..... At. ,A OIL AND GAS CONSERVATION COMMISSIC.. REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown_ Stirnulate__ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_Z 62' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic _ Anchorage, AK 99510-0360 Service_ Prudhoe Bay Unit 4. Location of well at surface: ,8. Well number: 1185' NSL, 383' WEL, Sec 28, T11N, R15E, UM 11-30 At top of productive interval: 9. Permit number/approval number: 1902' NSL, 3830' WEL, Sec 21, T11N, R15E, UM 94-77 At effective depth: 10. APl number: 50-029-22484 At total depth: 11. Field/Pool: 3085' NSL, 328' WEL, Sec 20, T11 N, R15E, UM Prudhoe Bay' Oil Pool 12. Present well condition summary Total Depth: measured 13719 feet Plugs (measured) true vertical 8759 feet Effective Depth: measured 13719 feet Junk (measured) true vedical 8759 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 76' 20" 260 Sx Arcticset 110' 110' Surface 3947' 13-3/8" 1561 Sx CS III & 3982' 3723' 375 Sx Class G Production 11361' 9-5/8" 775 Sx Class G 11393' 8317' Liner 1593' 7" 285 Sx Class G 12825' 8784' Slotted Liner 1066' 4-1/2" Uncemented 13719' 8759' Perforation Depth measured 12400'- 12412'; 12432'- 12458'; 12500'- 12550'; 12602'- 12638'; 12720'- 13696'; Slotted Liner: 12792' - 13696' true vertical 8747' - 8747'; 8751' - 8754'; 8758'- 8764'; 8769'- 8775'; 8782'- 8783'; Slotted Liner: 8783'- 8760' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, Tbg @ 11322' MD. Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 11276' MD; TIW SS High Angle Hanger Packer @ 12663' MD; 4-1/2" Camco TRDP sssv 13. Stimulation or cement squeeze summary ORIGINAL Intervals treated (measured) J U L. Intervals treated (measured) n~,,,,t,,~ rill ~, P~n~ f;nn~ NnmITliSSi '14. ReDresentitive Daily Averaae Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1524 32143 0 854 Subsequent to operation 2608 38027 0 989 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ X Oil _X Gas _ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .~/ .-- Title: Engineering Supervisor Date "'~- ,,?,.,,~ - ¢~' ~r,n Oba/_~'~ ~ · Prepared by Paul Rau[ 263-4.990 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 11-30 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 3/27/98: RIH w/dummy gun to 12260' MD. 3/30/98 - 3/31/98: MIRU & PT equipment to 3500 psi. Loaded well w/Crude. RIH w/perforating guns & shot 38' of Add perforations as follows: 12400' - 12412' MD (Zl B) 12432' - 12458' MD (Z1B) Ref. Log: PDK-100 1/18/97. Used a 3-3/8" carriers and shot 6 SPF, random orientation, at 60 degree phasing, & at balanced pressure. Noted guns fired. POOH w/per[ gun. RD. Returned the well to production & obtained a valid well test. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10246 Company: Alaska Oil & Gas Cons Comm Attn: Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 6/18/96 Field: Prudhoe Bay Anadrill Anadm'ill Floppy Well Job # l. og Description Date BL RF Sepia Survey Program Disk Calculation SIGNED' · /v~ DA'I-E: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. D.S. 4-3~ ST 961 56 CNT-[) D.S. 5-25 961 37 TDT-P D.S. 1-9A PERFC)R/~ 'Dis 1-22A TM PRODUC D.S. 2-'!8A ~-' TDT-P B( D.S. 7-'13A j PERFOR~ D.S. 9-10 PERFORJ D.S. 9-35 (,.Y~.) -' PERFORi D.S. 11-30 ~,' PERFORI .,, D.S. 12-31 -/ INJECTIO · D.S. 13-16 '/ INJECT10 DiS. 14-13 INJECTIO g.s. 14-16 /'' LEAK DE D.S. 14-27 ~/ INJECTIC , . ~ ,, .......... ~/ 7/~(~" 960510 .............................. -~- _.~#-' ? I "~? ....... 960.425 . .. 1 ,'['iON RECORD 960529 1 1 i'iON & GAS ENTRY LOG 960529 1 1 ~RAX 960603 I 1 ,;['iON RECORD 960602 1 1 ,T]ON RECORD 960523 1 1 ,TION RECORD 960526 1 1 FIr'ION RECORD 960509 I 1 N PROFILE 960525 1 1 N PROFILE 960527 1 1 N PROFILE 960527 1 1 'I'ECTION LOG 960523 1 1 , N PROFILE 960527 1 1 .... -- -- ,. GeoQuest .500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10228 Company: Alaska Oil & Gas Cons Corem Attn: Howard Oakland 3001 Porcupine [)rive Anchorage, AK 99501 6/6/96 Field: Prudhoe Bay Anadrill Ai]adrill Anadrill Floppy Well Job # Log l)escription Date BL RF Sepia Survey Program Pedormanc~: Disk Calculation Letter , D_~S. 11-13A~ ?1,}~ 96144 CNT-D 960506 1 D~.S. 3-33 # ')1~ 9605'6 "' icNT-D 960214 1 D,S. 1-15A ---"' PROD PROFILE 960515 I 1 D,S. 1-17A ~"~ TEMPERATURE 960505 I 1 D,S. 1-19 '-~ PROD PROFILE 960425 I 1 D:S. 2-2 ---~' PERF RECORD ~96051 I 1 1 D~S. 2-4 c--~' PERFRECORD 960507 I 1 D.S. 2-10 '--'"~ PERFRECORD 960507 I 1 D.S. 2-25 '---~"~-, PROD PROFILE 960427 1 I : DiS, 3-12 --'~ iNJECPROFiLE 960501 I 1 ., .... , .... D.S. 3-17 ----~' iNJECPROFiLE 960501 I I ~' ..... D:S. 4-30 ST ~ CNT-D 96051 0 I 1 ........... D.S. 5-16A ~ TBG PATCH & POGLM 960426 I 1 ...... D.S. 5-25 ---"~ DUAL BURSTTDT-P 960425 I 1 D.S. 6-08A ----'/ PROD PROFILE 960424 I 1 D.S. 6-23 ~ PROD PROFILE 960424 I 1 ........ D.S. 11-13A,-~- CNT-D 960506 I 1 D.S. 11-23A ,---'~ LEAK DE'IECTION 960506 1 1 :D.S. 11-30 --~ PERFRECORD 960510 I I .,, , D.S. 15-39 -~ PROD PROFILE 960430 I 1 D.S. 16-5 ,--'~ PERFRECORD 960504 I I ..... ,,, ;~ .... ..~ ~;-' ~ .'~ ,~ ~ ;-~._~ ~ ¢.,.. D.S. 1 8-01A ,--"'" PERF IrIECOI:.~D ;960501 I I ~' ';(. ~!' ~,~,~.' ";:~-~"'" !~ "' ''~ _. D.S. 18-34 ,../ PROD PR()FILE [960427 1 1 · .., ~--~'~ .. /' .' ' ., ,~ ;"~ -/" SIGNED: ---:' ,Z~"_'A,_ ,-? ..___ .:'_ DATE: ' ':tr. ,. i ". ~ ~'!..:' ("'""~':\'~: '':'~'; ''~ 'i',,.. ~', :, :h,':)'.';-;,;'-:',': Please sign and r~tbrn or,e copy of this ~ra~,s,nittal to Sherrie at the above address. Thank you. ...... STATE OF ALASKA ALASKA ...,- AND GAS CONSERVATION CO~viivllSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1185' NSL, 383' WEL, Sec 28, T11 N, R15E, UM. At top of productive interval 1902' NSL, 3830' WEL, Sec 21, T11 N, R15E, UM. At effective depth At total depth 3085' NSL, 328' WEL, Sec 20, T11N, R15E, UM. 5. Type of Well Development Exploratory StratigraphJo Servioe 0RI61NAL 6. Datum of elevation(DF or KB) 62' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 11-30 9. Permit number/approval number 94-77 10. APl number 50 - 029-22484 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 13719 feet Plugs(measured) 8759 feet Effective depth: measured 13719 feet true vertical 8759 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 76' 20" 260 Sx Arcticset 110' 110' Surface 3947' 13-3/8" 1561 Sx CS III & 375 Sx CIG 3982' 3723' Production 11361' 9-5/8" 775 Sx CIG 11393' 8317' Liner 1593' 7" 285 Sx CIG 12825' 8784' Slotted Liner 1066' 4-1/2" Uncemented 13719' 8759' Perforation depth: measured 12500 - 12550'; 12602 - 12638'; 12720 12792'; Slotted Liner: 12792 - 13696' true vertical 8758 - 8764'; 8769 - 8775'; 8782 - 8783'; Slotted Liner: 8783 - 8760' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 11322' MD. Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 11276' MD; Camco TRDP SSSV @ 2037' MD. D F.C ~ I ~IF. 13 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure JUN o 4 1996 Alaska 011 & ~a~ Oon~. C0mmi~ion An. choraoe 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1407 16866 33 -- 4918 18837 167 Tubing Pressure 334 5O9 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~.~,~ ~,'/. ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 11-30 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 5/9/96: MIRU & PT equipment. RIH w/perforating guns & shot 36' of add perforations as follows: Added perforations: 12602 - 12638' MD (ZlA) Ref. Log: MWD Porosity 6/4/94. Used 3-3/8" carriers & shot perfs at 4 spf at 180 degree phasing at underbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. 5/1 0/96: MIRU & PT equipment. Added perforations: RIH w/perforating guns & shot 50' of add perforations as follows: 12500 - 12550' MD (ZlB) Ref. Log: MWD Porosity 6/4/94. Used 3-3/8" carriers & shot perfs at 4 spf at 180 degree phasing at underbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to production & obtained a valid welltest. RECEIVED ,JUN 0 4 1996 Alaska 011 & Gas Cons. 6ommissiof~ Anchorage A'$3C~"C Inc!i'vi:ciuai L,./ei I P E [-;: H I T D A 'r A T D A T A_.P t LIS 1 ~.4-S 0 -,~ 13720 14.80 ....'13720: '1 z~ 80,- 13720 COL OR L 8329~'8759~ klWD, TVD L '11~16'-137i9, ktWD~ L 8329-'8759~ NWD~ TVD L 11/~'16'w13719~ ktWD~ND L 11~-~16~-.13353 L 8329-8759 TVD L 8329'--8759 TVD R VISUAL LZTHC, LOGY ~0-*-12560 SPERRY S!JN ,::C, kIF' DATE: 06/12/9t~ t.~ 05/22'-'06/17/94. 100-12100 Page; 'i [}atp:~ 0~/0~5,. / RUN DA'f'E ..... RECVr.) 0'?/'i 1/9/~ 07/i i/9/t o '? 1 i 11 9 ~ 1-'-6 07/'i 'i/98. 1 ..... 6 07/'I'i/9q. 1--.6 07/ i 'i/' 9z~ 1---6 07/ I 'i/' 9~ 1 .... 6 09/02/'9~ '1-6 09/02/9z~ I .... 6 09/C)2/9~. 07/i i/9a- 09/27/94 09/27/9a 09/27/9~t I 0 I / I 0,/95 Ar'e dr'y (:l 'i: 't: c h samples r'ecluSr'ed? yes (~__~nd r'ece'ived? ~ no ',,,,l,::~s the well cor'ed? yes ~aiys'fs & descr'i~ti'nn r'ec~ yes Ar-e we'l 'i ltes'l;s r'equi'red{' yes ~ece:l'ved'? ~,~ Ro - Wei I i':s i'n compi'i'ance ~ I n 'i t 5 a '1 C C, I~t kl E N T S 0 I:t I I--I--I ~ G S E I::l~J I r' E S To: State of Alaska Attn: Larry Grant, AOGCC 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 11-30 December 29, 1995 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS lis~g. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9183 Company: 1/1 O/95 Alaska Oil & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 3-7 -7 ~ ~_6 _~_~.~ STATIC BH PRESS SURVEY (12-11-94) I 1 D.S. 3-14 - STATIC SE PRESS SURVEY (12-11-94) I 1 D.S. 4-27 ~--~ ~ STATIC aH PRESS SURVEY (12-14-94) I 1 D.S. 4-28 ~ ~ ~~ STATIC BE PRESS SURVEY (12-14-94) I 1 O.S. 4-44 b"l;O DUAL BURST TDT-P (12-13-94) I 1 D.S. 4-45 q ~ ~ ~ DUAL BURST TDT-P (12-12-94) I 1 D.S. 5-16A ~i~ TUBG PUNCHER & POGLM SE~ING RECORD (12-13-94) I 1 ~D.~ 9-32 ~~,J J~ INJEC PROFILE (12-12-94) / I 1 D.S. 11-32 ~ ~/~ STATIC BE PRESS SURVEY (12-12-94) ~ I 1 D.S. 15-40 ~ ~ ~.~ PDC (12-11-94) 1 1 D.S. 3-13 ~ ~ ~ O ~. STATIC PRESS SURVEY (12-19-94) 1 1 D.S. 4-20 ~ ~ _ t~ STATIC PRESS SURVEY (12-14-94) 1 1 D.S. 4-20 ~ ~ ~ m [ INJEC PROFILE (12-14-94) 1 1 )D.S. 5-33 ~,)~ ~_~ PERF RECORD (12-19-94) 1 1 D.S. 11-30~.~ ~ ~ STATIC PRESS SURVEY (12-16-94) 1 1 :D.S. 12-27 ~': ~ IlNJEC PROFILE (12-21-94) I 1 D.S. 16-21 3 ~ } ~ INFLATABLE BRIDGE PLUG SET RECORD (12-20-94) I .D I SI G N E D _~_~L~~ Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. .... ,.. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SLJSPEh,EE.D [] ABANDONED I-'1 SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, inc. 94-77 3. Address B. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22484 4. Location of well at sudace 9. Unit or Lease Name At Top Producing Interval ' i-', .,';,h~ ~ . 10. Well Number ~ .i~ Prudhoe Bay Field/Prudhoe Bay Pool At Total Depth .,~ ' 3085' NSL, 328' WEL, SEC. 20, T11N, R15E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 62.4' I A DL 28321 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ll 5. Water Depth, it offshore 116. No. of Completions I 5/22/94 6/11/94 6/12/94 N/A feet MSL J One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey ~20. Depth where SSSV set ~1. Thickness of Permafrost / 13719'MD/8759' TVD 13719'MD/8759' TVD YES [] NO [] 2037' feet MD ! 1900'(Approx.) 22. Type Electric or Olher Logs Run DEN/NEU/RES 23. CASING, LINER AND CEMENTING RECORD SE'FI'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTI',~ RECORD AMOUNT PULLED 20" 91.5# H-40 34' 110' 30" 260 sx Arcticset (Approx.) 13-3/8" 68# NT-80 35' 3982' 16" 1561 sx CS 111/375 sx "G" 9-5/8" 47# NT-80S 32' 11393' 12-1/4" 775 sx Class "G" 7" 26/29# NT-80/13CR 11232' 12825' 8-1/2" 285 SX Class "G" 4-1/2" 12.6# 13CR 12653' 13719' 6" Uncemented slotted liner 24. Pedorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD1 PACKER SE-I' (MD) Gun Diameter 4-1/2" 5 spf 4-1/2", L-80 11322' 11276' MD TVD (SS) 12720'-12820' 8676'-8692' 26. ACID, FRACTURE, CEMENT SQUFF7F. ETC. S/otted Liner 12820'- 13696' MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODL~TION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 8/26/94 I FIowing Date of Test Hours Tesled PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL ICHOKE~ IGAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED 31L-BBL GAS-MCF WATER-BBL ~IL GRAVITY-APl (corr) / Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED SEP 2_. 7 1994 Ai~ska Uti & Gas Cons. Commission Anch0r~.~.~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ,~ ~. 30. '~'~-.~ GEOL~ MARKERS FORMATION TESTS NAME Include interval lasted, pressure data, all fluids recovered and gravily, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea Top Sadlerochit 11449' 8285' Zone 3 11641' 8387' Base Sadlerochit 12319' 8651' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~(.~ Title DrillingEnoineerSuoervi$or Date F-~'['''~L~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". R E C [ IV E ~ Form 10-407 ANNULAR INJECTION DATA ENTRY SCREEN Asset .EO~ ........................................... Legal Desc ....................................................................................................................... Research Rig Name ..................................................... · ....................................................................................................................... C~rzP,,c:[ed..c.Q~3¥..,s e~..t~..AQG C.(;..3.:.;I.Z.:~Z ............... , Inj Well Name .;L.1.=3.0 ...................................... Permit Start ....... ;[./..;1../..9..~ ...... Permit End.....l.2~.3..l.~.9..4.... ' ......................................................................................................... Sur Csg Dep .3.9.&2 .............. · ............................................................. Cumulative Data Daily Data 12 DS 11-30 i ,518 2,029 5 4,552 ~n June 10 through July 20, 1994 B.8__~J:~¢~ .... 2,000 554 .%517 ............... 15 4~ 08~__ P..~,.....!..!..:2.~.8, ..¢..Z.Lg..~..L~.¢.....~..~.~ ..................................................................................................................................................................................................................... !.~.~ ...................... DS 11-23A 07/02/94 205 80 285 .DS 11-23A 07/03/94 659 659 DS 11-23A 07/04/94 880 216 1~096 DS 11-23A 07/05/94 96 96 - .~.~....~..~..:~.~, .9.Z.LgZ.L~.,~ ........................................ ~.9.9 ............................................................................................................................................................... ~.g.9 ............................................................................................................................................................................................................................... DS 11-23A 07/08/94 77 ~77 DS 11-23A 07/09/94 118 1~382 1~500 DS 11-23A'07/10/94 80 80 DS 11-33 07/1 2/94 55 55 P S 112~.~..... ~_~/..~.~J~_~_ .~_~ ....................................................................................................... ............ 939 ........................................................................................................................................................................................ DS 11-33 07/13/94 25 25 DS 11-33 07/14/94 ;30 30 DS 11-33 07/15/94 140 50 190 DS 11-33 07/16/94 40 40 DS 11-33.....- .~.Z~1_7_/~_~ ........................... ~.~ ......................................................................................................... DS 11-33 07/18/94 80 80 DS 11-33 07/20/94 600 250 850 DS11 23A 80 80 DS 11-33 07/19/94 120 30 150 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 11-30 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 05/21/94 11:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 05/22/94 ( 1) TD: 140' ( 140) 05/23/94 ( 2) TD: 1780' (1640) DRILLING MW: 0.0 VIS: 0 MOVED RIG F/ 11-35 TO 11-30. RIG UP FLOOR. N/U RISER, FLOWLINE AND JET LINES. TAKE ON H20 IN PITS. P/U BHA. ORIENT MWD. FUNCTION TEST DIVERTER. DRLG F/ 110-145'. DRILLING DRLD AND SURVEY F/ 140-1780'. MW: 9.3 VIS:275 05/24/94 ( 3) TD: 3334' (1554) 05/25/94 ( 4) TD: 4000' ( 666) 05/26/94 (5) TD: 4365' ( 365) DRILLING MW: 9.6 VIS:310 DRILLING AND SURVEYING F/ 1780-2638'. SHORT TRIP T/ HWDP. NO HOLE PROBLEMS. DRLG F/ 2638-2670'. L/D 5 JTS OF DP AND REAM 7 DEG DOGLEG. DRILLING AND SURVEYING F/ 2670-2995'. L/D 4 JTS OF DP AND REAM 6 DEG DOGLEG. DRILLING AND SURVEYING F/ 2995-3334' CMT 13 3/8" CSG MW: 9.5 VIS:154 DRLD AND SURVEY F/ 3334-4000' SHORT TRIP TO HWDP. SLM, NO CORRECTION. NO HOLE PROBLEMS. CIRC AND COND MUD. DROP SINGLE SHOT AND PUMP DRY JOB. POH F/ CASING. BREAK STABS AND L/D MOTOR. R/U AND RAN 97 JTS 13 3/8" 68# NT-80 BTC CASING + FLOAT EQ., FS @3892' AND FC @3893' CIRC AND COND MUD. PRESS TEST CMT LINES. PUMP 50 BBLS H~0. MIX AND PMP LEAD CMT. DRILLING MW: 9.1 VIS: 39 FINISH MIX AND PMP 1561 SX COLDSET III LEAD CMT @12.2 PPG. DROP BTM PLUG. MIX AND PMP 375 SX CLASS "G" CMT + ADDITIVES @15.8 PPG. DROP TOP PLUG. DISPLACED CMT W/ 583 BBLS MUD. RECIPROCATED CASING W/ GOOD RETURNS THROUGHOUT JOB. NO CMT RETURNS TO SURFACE. B~ED PLUG TO 2000 PSI F/ CSG TEST. FLOATS HELD OK. PERFORMED TOP JOB. HAD GOOD CMT TO SURFACE. L/D LANDING JT AND CLEAR FLOOR OF CASING TOOLS. N/D DIVERTER, FLOWLINE AND RISER. N/U UNIVERSAL BIG BORE 13 5/8" SPLIT UNIHEAD. N/U BOPE. TESTED PIPE RAMS, BLIND RAMS, CHOKE AND KILL LINE VALVES, HCR VALVE, FLOOR SAFETY VALVES AND CHOKE MANIFOLD. TESTED ANNULAR. FUNCTION TESTED ACCUMULATOR. BOP TEST. RAN WEAR RING. P/U AND ORIENT BHA. RIH. TAGGED FC @3889' TEST 13 5/8" CASING. DRILLED FLOAT EQUIPMENT, CMT AND 1~' NEW HOLE TO 4010'. CIRC AND BALANCE MUD. PERFORMED LEAKOFF TEST. DRLD AND SURVEY F/ 4010-4365'. RECEIVED · '-..~:~K~. ~m & Gas ~ons. Go~lTlission .Anchor: :;~ WELL ' DS 11-30 OPERATION: RIG : NABORS 28E PAGE: 2 05/27/94 ( 6) TD: 6350'(1985) 05/28/94 ( 7) TD: 7421' (1071) 05/29/94 ( 8) TD: 8350' ( 929) 05/30/94 ( 9) TD: 9528' (1178) 05/31/94 (10) TD: 10257' ( 729) 06/01/94 (11) TD:ll040' ( 783) DRILLING MW: 9.6 VIS: 44 DRLD AND SURVEY F/ 4365-5081' SHORT TRIP TO CSG SHOE. NO HOLE PROBLEMS. DRLD AND SURVEY F/ 5081-6064' SHORT TRIP TO 4900'. NO HOLE PROBLEMS. DRLD AND SURVEY F/ 6064-6350'. RIH MW: 9.9 VIS: 42 DRLD AND SURVEY F/ 6350-7051'. SHORT TRIP T/ 5695'. NO HOLE PROBLEMS. CIRC SWEEP. TOH 25 STDS. SWABBING. RIH. CIRC AND WT UP MUD. PMP DRY JOB. TOH F/ BIT #3. CHANGE BIT AND MWD PROBE. RIH. SLIP AND CUT DRLG LINE. DRILLING MW: 9.9 VIS: 46 SLIP AND CUT DRLG LINE. FINISH RIH. PRECAUTIONARY REAM F/ 7330-7421' DRLD F/ 7421-8067'. POH, WET LOOKING FOR WASHOUT. DUMP VALVE ON MUD MOTOR WASHED OUT. NO HOLE PROBLEMS. RIH. PRECAUTIONARY REAM F/ 8000-8067' NO HOLE PROBLEMS. DRLD F/ 8067-8350' DRILLING MW: 9.8 VIS: 46 DRLD F/ 8350-9119' SHORT TRIP 10 STDS. NO HOLE PROBLEMS. REPAIR WASHOUT IN MUD PUMP MANIFOLD PIPING. DRLD F/ 9119-9528'. DRILLING MW: 9.8 VIS: 44 DRLD F/ 9528-10218' CIRC B/U SWEEP. POH AND P/U BIT #5. RIH. NO HOLE PROBLEMS. DRLD F/ 10218-10257'. DRILLING DRLD F/ 10257-11040' MW: 9.8 VIS: 46 06/02/94 (12) TD:l1416' ( 376) 06/03/94 (13) TD:l1416' ( 0) LD BHA MW: 9.8 VIS: 44 DRLG T/11416. CBU. 20 STND TRIP. TIGHT 9829 T/9610. OK ON TIH. CBU F/9-5/8" CASG. DROP SURV. & PUMP DRY JOB. TOOH T/RUN CASG. TIGHT @9760 & 9570. TEST BOPE MW: 9.9 VIS: 44 LD BHA. PULL WEAR BUSHING CHANGE TOP RAMS T/9-5/8". TEST SEALS T/3000. RU T/RUN CASG. HELD SFTY MTG. RUN 276 JTS CASG. MU LNDG JT & CMT HEAD. CIRC & COND MUD @ 12BPM. CAN'T RECIP. TEST CMT LINE T/3500. PUMP 20 BBLS WATER 70 BBLS MCS-4 @llPPG. 500 SX LEAD & 275 SX TAIL CMT. DROP PLUG W/5BBLS H20, DSPLC W/823 BBLS MUD @ 12BPM. BUMP PLUG W/3000. CIP @22:30. RD CMT HEAD & LNDG JT. SET PACKOFF. CHANGE TOP PIPE RAMS T/3.5 X 6-1/5". ATTEMPT T/TEST PACKOFF. NO GOOD. PULL & INSPECT. LOCK DOWN SCREW DAMAGE. LOWER JUNK RING. DRESS STBLZRS W/8.5" SLEEVES INSTALL NEW PACKOFF TEST T/5000/10 MIN. PUMP DOWN ANNUL. WILL INJECT 250 BBLS MUD. RU T/TEST BOPE. RECEIVED WELL ' DS 11-30 OPERATION: RIG : NABORS 28E PAGE: 3 06/04/94 (14) TD:1t724' ( 308) 06/05/94 (15) TD:12020' ( 296) 06/06/94 (16) TD:12345' ( 325) 06/07/94 (17) TD: 12829' ( 484) 06/08/94 (18) TD: 12829' ( 0) 06/09/94 (19) TD:12835' ( 6) DRILLING MW: 9.1 VIS: 47 TEST BOPE. MAKE UP BHA #6. SLIP NEW DRILL LINE OVER CROWN AND CUT OLD. INSTALL WEAR BUSHING. ORIENT BHA ANS LOAD LOGGING TOOLS. TRIP IN HOLE TO 11310' PRESSURE TEST 9 5/8" CASING. DRILL FLOAT EQUIPMENT AND CEMENT. CLEAN OUT HOLE TO 11416' CIRCULATE AND CONDITION MUD. DRILL FROM 11416-11478' UNABLE TO ROTATE DUE TO INCREASING TORQUE. PULL INTO CASING SHOE AND TREAT MUD WITH EP MUD LUBE. DRILL FROM 11478-11724' DRILLING MW: 9.1 VIS: 48 CIRCULATE SWEEP. TRIP OUT OF HOLE FOR BIT. LAY DOWN 64 JTS GRADE 'G' DP & 3-MDC. MAKE UP BHA #7. TRIP IN HOLE. WIPED OUT BRIDGE @11476'. WASHED FROM 11476-11634' PRECAUTIONARY REAMED FROM 11634-11724' DRILL FROM 11724-12020' DRILLING MW: 9.1 VIS: 44 DRILL FROM 12020-12034' TRIP OUT OF HOLE FOR BIT. NO HOLE PROBLEMS. BHA. SERVICE SPERRY SUN TOOLS. CHANGE MOTOR SLEEVE. LOAD SPERRY SUN. ORIENT. TRIP IN HOLE. PRECAUTIONARY REAM 80' TO BOTTOM. NO HOLE PROBLEMS. DRILL AND SURVEY FROM 12034-12231'. REPEAT LOGS FROM 12100-12231' DRILL AND SURVEY FROM 12231-12345'. LOG MW: 9.1 VIS: 47 DRILL AND SURVEY FROM 12345-12482' SHORT TRIP TO 9 5/8" CASING @11393'. NO PROBLEMS. DRILL FROM 12482-12829'. CIRCULATE SWEEP. SHORT TRIP 20 STANDS. NO PROBLEMS. CIRCULATE SWEEP. TRIP OUT OF HOLE TO 10900' WILL LOG WITH GAMMARAY FROM 10900 TO 11300' CIRC LINER ON BTM MW: 9.1 VIS: 46 LOG DOWN WITH GR FROM 10900-11300' CIRCULATE SWEEP. PUMP DRY JOB AND DROP RABBIT. TRIP OUT OF HOLE AND LAY DOWN BHA. HOLE IN GOOD CONDITION. CHANGE TOP RAMS TO 7". BODY TEST. RIG UP TO RUN 7" LINER. RUN 42 JTS 7" LINER. MAKE UP CEMENT HEAD AND CIRCULATE LINER VOLUME @ 9 5/8" CASG SHOE. NO PROBLEMS IN OPEN HOLE. CIRCULATE AND RECIPROCATE 30' STROKES @ BOTTOM. DISPLACE W/ FLO-PRO MW: 9.0 VIS: 79 CIRCULATE AND BATCH MIX CEMENT. TEST CEMENT LINE. REVERSE CIRCULATE 1 1/2 BBL CEMENT TO SURFACE. TRIP OUT OF HOLE AND LY DOWN RUNNING TOOL. CUT DRILL LINE. LAY DOWN 12 STANDS EXCESS 5" DRILL PIPE. CHANGE RAMS AND FULL BOPE TEST. PICK UP AND MAKE UP BHA #9. TRIP IN HOLE. TAG CEMENT STRINGERS @12613'. DRILL CEMENT STRINGERS FROM 12613' TO LANDING COLLAR @12745'. PRESSURE TEST CASING/LINER. DRILL LANDING COLLAR AND HARD CEMENT TO THE SHOE + 10' NEW HOLE. DISPLACE WITH FLO-PRO MUD. ECEIVED WELL : DS 11-30 OPERATION: RIG · NABORS 28E PAGE: 4 06/10/94 (20) TD:13354' ( 519) 06/11/94 (21) TD:13354' ( 0) 06/12/94 (22) TD:13719' ( 365) 06/13/94 (23) TD:13719' ( 0) 06/14/94 (24) TD:13719' ( 0) TRIP OUT OF HOLE W/ FISH MW: 9.1 VIS: 53 DISPLACE HOLE WITH FLO-FRO DRILLING FLUID. DRILL FROM 12835-13354' WHILE WORKING TORQUE DOWN HOLE TO TURN TOOL FACE FOR SLIDE THE DRILL STRING PARTED LEAVING 105,000# STRING WT. MADE BACK UP IN TO FISH AND TRIP OUT OF HOLE. TRIP IN HOLE MW: 9.1 VIS: 54 TRIP OUT OF HOLE. DID NOT FIND BACK OFF PINT. HOLE IN GOOD CONDITION. CHANGE BIT AND TRIP IN HOLE CHECKING ALL CONNECTIONS FOR TORQUE AND MAKE UP. FOUND BACK OFF POINT @ 36 STANDS & 1 SINGLE FROM SURFACE. CHANGED OUT 2 JOINTS OF 5" DP. MAD PASS LOG FROM 12770-12830' TRIP IN HOLE. BREAK CIRCULATION. NO DATA FROM MWD TOOLS. ATTEMPT TO CHANGE DATA RATE ON MWD. FAILED. MIX AND PUMP DRY JOB. TRIP OUT OF HOLE. FOUND WASH OUT IN 3 1/2" NO MAG HWDP. TRIP IN HOLE. TRIP OUT OF HOLE MW: 9.1 VIS: 55 TRIP IN HOLE. NO PROBLEMS. DRILL FROM 13354-13719' CIRCULATED BOTTOM UP. HOLE STARTED TAKING FLUID. SHORT TRIP TO 7" CASING SHOE. NO PROBLEMS. NO NOTICABLE FLUID LOSS WHILE MAKING SHORT TRIP. CIRCULATE SWEEP. LOOSING 5 BPH WHILE CIRCULATING. SPOTTED 40 BBL LOW FLOW FLUID LOSS PILL WITH 1 PPB XANVIS AND 2 PPB FL-7 IN OPEN HOLE. TRIP OUT OF HOLE TO PICK UP DRILL PIPE CONVEYED PERF GUNS. HOLE OPENER MW: 9.1 VIS: 56 TRIP OUT OF HOLE TO PICK UP DRILL PIPE CONVEYED PERF GUNS. CUT DRILLING LINE. TRIP OUT OF HOLE. LAY DOWN MOTOR AND MWD. STRAIGHTED UP RIG FLOOR. MAKE UP DP CONVEYED PERF ASSEMBLY. TRIP IN HOLE WITH PERF ASSEMBLY. SET HEC CHAMP PACKER AND PERFORATE 7" LINER LAP FROM 12820-12720' 5 SPF. OBSERVE WELL. PUMP DRY JOB. TRIP OUT OF HOLE. LAY DOWN PERF ASSEMBLY. SERVICE WEAR BUSHING. TRIP IN HOLE W/ 6" HOLE OPENER AND 7" SCRAPER. L/D 30 JTS OF DP. REAM HOLE WITH 6" HOLE OPENER FROM 12667' DROP LINER SETTING BALL MW: 9.1 VIS: 59 HOLE OPENER AND CASING SCRAPER RUN TO 13179' CIRCULATE SWEEP. SPOT 45 BBL LCM PILL IN OPEN HOLE. TRIP OUT OF HOLE TO 7" SHOE. NO PROBLEMS. OBSERVE HOLE. LOOSING 4 BPH. PUMP DRY JOB AND DROP RABBIT. TRIP OUT OF HOLE TO RUN 4 1/2" SLOTTED LINER. RUN 2 1/16" CS HYDRILL INSIDE 4.5" SLOTTED LINER. M/U HANGER/PACKER. TRIP IN HOLE WITH LINER ON 3.5 X 5" DRILL PIPE. DROP SETTING BALL AND M/U CIRC HEAD. PUMP BALL DOWN TO LINER HANGER. RECEIVED WELL : DS 11-30 OPERATION: RIG : NABORS 28E PAGE: 5 06/15/94 (25) TD:13719' ( 0) 06/16/94 (26) TD:13719' ( 0) 06/17/94 (27) TD:13719 PB: 8759 RIH W/ 7" MAGNET MW: 8.5 VIS: 0 PRESSURE UP 3000 PSI AND SET HANGER/PACKER. BALL SEAT SHEARED WHILE INCREASING PRESSURE TO 3500 PSI. RELEASE FROM LINER. DISPLACE WITH 100 BBL SEA WATER WITH 3 PPB XANVIS FOLLOWED BY 1100 BBL SEA WATER. PULLED OUT OF PACK OFF AND SPOT 35 BBL OF LITHIUM HYPCHLORITE INSIDE LINER. TRIP OUT TO TOP OF 4 1/2" LINER. DISPLACE WELL WITH SEA WATER WITH 25 GAL/100 BBL CORREXIT 7726. OBSERVE WELL. TAKING 4 BPH. PUMP DRY JOB. TRIP OUT OF HOLE LAYING DOWN DRILL PIPE. LOST DIE OUT OF TRI-STATE DOG COLLAR WHILE LAYING DOWN 2 1/16" CS HYDRIL TUBING. LINE UP AND WAIT FOR OTIS SLICK LINE UNIT TO ARRIVE ON LOCATION. RIG UP OTIS SLICK LINE AND RIH WITH TRI-STATE 7" O.D. MAGNET. N/U TREE MW: 8.5 VIS: 0 RINISH RUN 7" MAGNET TO 7" LINER TOP. DID NOT RECOVER DIE. RIH W/ 6.00" GAUGE RING/JUN BASKET TO 11600' NO PROBLEMS. PULL WEAR RING. RUN 4 1/2" 12.6# L-80 TDS COMPLETION ASSEMBLY. R/U CAMCO AND M/U CONTROL LINE. TEST. FINISH RUN 4 1/2" TBG. TAGGED UP @ 11349' L/D 2 JTS TBG AND P/U TBG HGR AND LANDING JT. TEST CONTROL LINE. LAND TBG AND DROPPED BALL ASSEMBLY. RILDS. PRESSURE TBG AND SET PKR @ 11275'. PRESSURE TEST. PERFORMED PRELIMINARY PKR TEST. PKR AND CSG HELD OK. SET 2-WAY CHECK VALVE. N/D BOP'S. N/U TUBING ADAPTOR AND 4" CAMERON 5000 FLS TREE. RELEASED RIG MW: 0.0 FINISH N/U 4" 5000 CAMERON CARBON STEEL TREE. TEST. R/U LUBRICATOR AND PULL 2-WAY CHECK VALVE. PRESS TEST PACKER AND 9 5/8" CSG, OK. PRESS TEST TBG. SHEARED RP VALVE. PUMP 146 BBLS DIESEL FREEZE PROTECTION DOWN ANNULUS. SET BPV. U-TUBE DIESEL INTO TBG FOR FREEZE PROTECT. INJECTER 25 BBLS DIESEL FREEZE PROTECTION INTO SURFACE CSG ANNULUS. SECURED WELL. RELEASE RIG @1300 HRS ON 06/16/94. SIGNATURE: (drilling superintendent) DATE: RECEIVED S EP 2 7 !99 . ;'~.~;ka ~;Li & Gas CONS, Commission Anchor~ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 0 .00 -61.70 145 145.00 83.30 238 238.00 176.30 328 327.99 266.29 418 417.99 356.29 DATE OF SURVEY: 061294 MWD SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 0 0 N .00 E .00 .00N .00E 0 18 S 83.40 E .21 .04S .38E 0 24 S 65.90 E .16 .20S .92E 0 42 S 36.10 E .45 .78S 1.53E 0 42 S 29.10 E .09 1.70S 2.12E VERT. SECT. .0O -.26 -.70 -1.52 -2.62 508 507.98 446.28 598 597.90 536.20 688 687.54 625.84 778 776.96 715.26 872 870.35 808.65 0 36 N 4.60 E 1.38 1.71S 2.42E 3 47 N 7.40 W 3.57 1.72N 2.08E 6 11 N 8.50 W 2.67 9.48N .97E 6 48 N 8.50 W .67 19.56N .53W 6 18 N 9.90 W .56 30.14N 2.24W -2.81 .17 7.11 16.15 25.72 967 964.76 903.06 1063 1060.13 998.43 1158 1154.32 1092.62 1253 1248.11 1186.41 1348 1341.56 1279.86 6 24 N 14.50 W .55 40.40N 4.46W 6 48 N 14.40 W .42 51.09N 7.22W 8 6 N 13.50 W 1.37 63.04N 10.18W 10 6 N 10.00 W 2.18 77.75N 13.19W 10 36 N 16.50 W 1.34 94.33N 17.11W 35.34 45.60 57.02 70.70 86.43 1444 1435.88 1374.18 1538 1528.15 1466.45 1634 1622.19 1560.49 1729 1714.78 1653.08 1825 1807.99 1746.29 10 53 N 22.70 W 1.24 lll.17N 23.13W 11 6 N 17.80 W 1.02 127.99N 29.32W 12 6 N 18.60 W 1.05 146.32N 35.36W 13 41 N 14.90 W 1.89 166.63N 41.42W 14 0 N 14.60 W .32 188.86N 47.27W 103.59 120.85 139.23 159.24 180.67 1920 1900.08 1838.38 2015 1991.93 1930.23 2110 2083.19 2021.49 2206 2174.85 2113.15 2301 2265.35 2203.65 14 23 N 13.00 W .59 211.49N 52.83W 15 11 N 14.60 W .95 235.05N 58.62W 17 0 N 14.80 W 1.90 260.53N 65.31W 17 36 N 15.30 W .64 288.,09N 72.73W 17 47 N 15.70 W .25 315.93N 80.45W 202.25 224.73 249.29 275.96 303.03 2396 2355.57 2293.87 2491 2444.46 2382.76 2587 2533.93 2472.23 2681 2622.14 2560.44 2777 2711.45 2649.75 18 42 N 19.00 W 1.44 344.30N 89.33W 22 36 N 25.70 W 4.79 375.17N 102.21W 19 53 N 24.80 W 2.83 406.63N 117.07W 20 30 N 21.60 W 1.34 436.45N 129.84W 22 30 N 18.50 W 2.40 469.50N 141.85W 331.22 363.77 397.96 429.61 463.42 2872 2798.16 2736.46 2967 2884.08 2822.38 3062 2970.15 2908.45 3157 3055.15 2993.45 3253 3139.10 3077.40 25 42 N 14.90 W 3.71 506.66N 152.92W 24 47 N 12.80 W 1.34 545.99N 162.63W 25 17 N 14.90 W 1.07 585.04N 172.27W 27 42 N 14.20 W 2.55 626.06N 182.90W 30 17 N 13.90 W 2.71 671.21N 194.20W 500.00 537.55 574.82 614.28 657.47 ORIGINAL RECEIVED SEP 2'f 199 k,!~ L)g & Gas Cons. Commission Anchor~. ,? SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 MWD SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3348 3220.22 3158.52 3444 3300.54 3238.84 3539 3378.45 3316.75 3634 3454.91 3393.21 3730 3530.81 3469~11 32 24 N 15.80 W 2.44 718.96N 206.88W 34 0 N 17.10 W 1.82 769.36N 221.78W 35 47 N 17.80 W 1.94 821.21N 238.08W 37 0 N 20.20 W 1.96 874.49N 256.45W 38 30 N 22.20 W 2.02 929.27N 277.71W 703.58 753.13 804.68 858.60 915.44 3824 3603.59 3541.89 3917 3674.20 3612.50 4051 3775.10 3713.40 4147 3847.06 3785.36 4242 3916.75 3855.05 40 0 N 23.40 W 1.79 984.08N 300.77W 41 12 N 26.00 W 2.23 1039.04N 326.06W 41 5 N 26.40 W .21 1118.16N 364.99W 41 47 N 29.60 W 2.32 1174.24N 394.83W' 43 47 N 29.70 W 2.11 1230.33N 426.75W 973.35 1032.70 1119.61 1182.53 1246.68 4338 3984.68 3922.98 4433 4049.70 3988.00 4529 4113.81 4052.11 4623 4174.79 4113.09 4719 4235.47 4173.77 46 5 N 29.90 W 2.40 1289.17N 460.46W 47 30 N 32.20 W 2.30 1348.47N 496.18W 48 42 N 31.90 W 1.27 1409.03N 534.09W 50 24 N 29.60 W 2.60 1470.50N 570.64W 51 12 N 29.60 W .83 1535.18N 607.38W 1314.10 1383.08 1454.37 1525.58 1599.52 4814 4295.89 4234.19 4909 4357.96 4296.26 5004 4420.55 4358.85 5100 4482.89 4421.19 5195 4543.64 4481.94 5290 4604.26 4542.56 5386 4665.38 4603.68 5481 4725.49 4663.79 5575 4785.09 4723.39 5671 4846.92 4785.22 49 47 N 27.80 W 2.08 1599.46N 642.59W 48 35 N 25.30 W 2.36 1663.77N 674.74W 49 0 N 28.70 W 2.73 1727.44N 707.19W 50 0 N 28.40 W 1.07 1791.56N 742.07W 50 30 N 29.00 W .72 1855.62N 777.15W 50 12 N 27.50 W 1.26 1920.05N 811.77W 50 42 N 27.50 W .52 1985.71N 845.95W 50 47 N 26.80 W .58 2051.17N 879.52W 50 30 N 26.90 W .33 2116.~02N 912.35W 49 17 N 27.60 W 1.37 2181.30N 945.96W 1672.23 1743.17 1813.76 1886.15 1958.61 2031.10 2104.32 2177.02 2248.80 2321.39 5767 4909.72 4848.02 5861 4971.38 4909.68 5955 5032.49 4970.79 6051 5093.36 5031.66 6147 5153.12 5091.42 49 0 N 27.10 W .50 2245.80N 979.33W 49 0 N 26.80 W .24 2309.04N 1011.48W 49 54 N 26.20 W 1.07 2372.95N 1043.34W 51 24 N 27.50 W 1.88 2439.17N 1076.88W 51 35 N 28.00 W .46 2505.66N 1111.86W 2393.19 2463.27 2533.72 2607.02 2681.38 6243 5212.49 5150.79 6337 5270.74 5209.04 6433 5330.96 5269.26 6529 5391.83 5330.13 6624 5451.81 5390.11 52 0 N 27.30 W .71 2572.49N 1146.87W 51 24 N 27.10 W .66 2638.10N 1180.59W 50 54 N 27.60 W .66 2704.50N 1214.93W 50 24 N 29.00 W 1.24 2769.86N 1250.12W 51 17 N 28.70 W .98 2834.39N 1285.67W 2756.04 2828.95 2902.88 2976.45 3049.56 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 MWD SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6720 5511.70 5450.00 6815 5571.48 5509.78 6910 5632.04 5570.34 7006 5693.17 5631.47 7102 5754.17 5692.47 51 30 N 28.20 W .46 2900.35N 1321.41W 50 30 N 27.10 W 1.38 2965.74N 1355.67W 50 17 N 27.10 W .21 3030.90N 1389.02W 50 35 N 25.20 W 1.56 3097.34N 1421.63W 50 30 N 26.40 W .97 3164.08N 1453.89W 3123.95 3197.00 3269.33 3342.27 3415.24 7196 5814.33 5752.63 7293 5877.65 5815.95 7389 5941.32 5879.62 7484 6003.96 5942.26 7579 6065.84 6004.14 49 54 N 28.50 W 1.83 3228.16N 1487.17W 48 35 N 28.70 W 1.35 3292.67N 1522.35W 48 17 N 30.30 W 1.29 3355.20N 1557.72W 49 12 N 28.30 W 1.84 3417.48N 1592.66W' 49 30 N 28.90 W .57 3480.76N 1627.16W 3486.66 3559.53 3630.92 3701.85 3773.34 7675 6128.82 6067.12 7770 6191.71 6130.01 7866 6254.82 6193.12 7961 6317.02 6255.32 8056 6379.41 6317.71 48 30 N 30.10 W 1.41 3543.81N 1662.83W 48 35 N 29.20 W .72 3605.69N 1698.05W 49 12 N 28.70 W .74 3669.00N 1733.07W 49 0 N 28.80 W .23 3731.95N 1767.61W 48 54 N 31.50 W 2.15 3793.88N 1803.58W 3845.33 3916.11 3987.91 4059.15 4130.41 8151 6441.73 6380.03 8246 6503.74 6442.04 8341 6565.76 6504.06 8437 6629.11 6567.41 8533 6693.10 6631.40 49 5 N 30.40 W .90 3855.37N 1840.45W 49 24 N 30.40 W .32 3917.44N 1876.87W 49 5 N 30.40 W .32 3979.52N 1913.29W 48 17 N 29.60 W 1.04 4041.97N 1949.35W 48 5 N 30.10 W .44 4104.04N 1984.97W 4201.84 4273.47 4345.10 4416.84 4488.00 8628 6756.36 6694.66 8723 6819.18 6757.48 8817 6880.92 6819.21 8911 6941.90 6880.20 9006 7002.52 6940.82 48 24 N 30.10 W .32 4165.36N 2020.51W 48 47 N 30.10 W .42 4227.01N 2056.25W 49 5 N 29.40 W .65 4288.56N 2091.43W 50 0 N 32.40 W 2.61 4349~91N 2128.16W 50 42 N 34.50 W 1.85 4410.92N 2168.47W 4558.51 4629.40 4699.88 4771.11 4844.17 9099 7060.47 6998.77 9193 7117.31 7055.61 9288 7173.41 7111.71 9381 7227.55 7165.85 9476 7282.38 7220.68 52 12 N 33.60 W 1.78 4471.18N 2209.19W 53 24 N 36.60 W 2.84 4532.41N 2252.24W 54 12 N 37.70 W 1.26 4593.51N 2298.54W 54 35 N 37.50 W .46 4653.42N 2344.68W 54 54 N 39.60 W 1.83 4714.08N 2393.02W 4916.86 4991.71 5068.34 5143.93 5221.42 9571 7336.67 7274.97 9665 7389.65 7327.95 9758 7440.56 7378.86 9851 7489.85 7428.15 9944 7538.51 7476.81 55 24 N 38.40 W 1.16 4774.67N 2442.08W 56 0 N 41.70 W 2.97 4834.09N 2492.04W 57 35 N 41.70 W 1.72 4892.19N 2543.80W 58 24 N 40.30 W 1.54 4951.71N 2595.54W 58 30 N 37.70 W 2.38 5013.29N 2645.40W 5299.26 5376.70 5454.11 5532.66 5611.78 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/9 DATE OF SURVEY: 061294 MWD SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 10039 7588.07 7526.37 10134 7637.57 7575.87 10228 7686.41 7624.71 10323 7735.83 7674.13 10419 7786.27 7724.57 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 58 35 N 39.80 W 1.89 5076.48N 2696.12W 58 35 N 40.10 W .27 5138.64N 2748.18W 58 47 N 39.10 W .93 5200.53N 2799.38W 58 30 N 40.30 W 1.12 5262.94N 2851.20W 58 5 N 40.30 W .42 5325.24N 2904.03W VERT. SECT. 5692.71 5773.60 5853.75 5934.70 6016.14 10514 7836.62 7774.92 10608 7886.71 7825.01 10703 7937.68 7875.98 10797 7988.39 7926.69 10891 8039.38 7977.68 57 54 N 39.80 W .49 5386.91N 2955.87W 57 42 N 38.70 W 1.01 5448.50N 3006.19W 57 24 N 39.20 W .55 5510.85N 3056.59W 57 17 N 38.80 W .37 5572.35N 3106.39W' 57 0 N 38.39 W .49 5634.07N 3155.66W 6096.50 6175.90 6255.96 6334.99 6413.87 10985 8090.79 8029.09 11079 8142.67 8080.97 11173 8194.82 8133.12 11268 8247.53 8185.83 11333 8283.60 8221.90 56 42 N 39.40 W .95 5695.32N 3205.07W 56 17 N 38.70 W .75 5756.20N 3254.45W 56 17 N 38.90 W .18 5817.14N 3303.45W 56 17 N 39.80 W .79 5878.26N 3353.57W 56 17 N 38.40 W 1.79 5920.22N 3387.67W 6492.46 6570.73 6648.84 6727.73 6781.72 11463 8354.63 8292.93 11528 8389.48 8327.78 11622 8438.85 8377.15 11723 8489.52 8427.82 11755 8505.05 8443.35 57 27 N 37.09 W 1.22 6006.31N 3454.30W 57 43 N 38.49 W 1.86 6049.66N 3487.92W 58 54 N 38.68 W 1.28 6112.19N 3537.81W 60 50 N 39.92 W 2.19 6179.77N 3593.14W 61 5 N 40.18 W 1.05 6201.19N 3611.14W 6890.52 6945.36 7025.26 7112.45 7140.36 11786 8520.10 8458.40 11818 8535.79 8474.09 11850 8551.62 8489.92 11882 8567.54 8505.84 11913 8582.98 8521.28 60 49 N 39.28 W 2.69 6222.03N 3628.46W 60 27 N 40.13 W 2.59 6243.49N 3646.28W 60 16 N 39.86 W .92 6264.80N 3664.16W 60 1 N 40.49 W 1.88 6286.00N 3682.06W 60 16 N 40.62 W .88 6306.43N 3699.54W 7167.40 7195.23 7222.97 7250.65 7277.45 11937 8594.72 8533.02 11952 8601.92 8540.22 11982 8615.86 8554.16 12014 8630.11 8568.41 12045 8643.37 8581.67 61 6 N 41.93 W 5.91 6322.16N 3713.35W 61 34 N 40.65 W 8.09 6332.04N 3722.03W 63 3 N 41.51 W 5.58 6352.07N 3739.49W 64 1 N 42.42 W 3.96 6373.37N 3758.64W 65 20 N 43.45 W 5.18 6393.88N 3777.73W 7298.28 7311.39 7337.84 7366.33 7394.14 12077 8656.13 8594.43 12108 8667.41 8605.71 12134 8676.26 8614.56 12166 8686.56 8624.86 12198 8696.16 8634.46 67 39 N 45.46 W 9.26 6414.82N 3798.28W 69 38 N 46.69 W 7.38 6434.84N 3819.07W 70 33 N 48.17 W 6.39 6451.38N 3837.08W 71 54 N 48.64 W 4.47 6471.49N 3859.73W 73 9 N 48.18 W 4.11 6491.75N 3882.56W 7423.16 7451.57 7475.52 7505.10 7534.90 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/9 DATE OF SURVEY: 061294 MWD SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 12229 8705.01 8643.31 12261 8713.85 8652.15 12292 8722.12 8660.42 12324 8730.25 8668.55 12354 8737.26 8675.56 73 41 N 49.21 W 3.65 6511.36N 3904.88W 74 12 N 52.54 W 10.13 6530.76N 3928.74W 74 51 N 51.85 W 3.00 6549.08N 3952.34W 75 41 N 52.92 W 4.17 6567.97N 3976.86W 77 15 N 54.31 W 6.88 6585.27N 4000.33W 7563.88 7593.59 7622.27 7651.95 7679.73 12386 8743.76 8682.06 12402 8746.53 8684.83 12416 8748.66 8686.96 12448 8752.68 8690.98 12479 8755.75 8694.05 79 19 N 56.17 W 8.62 6603.13N 4026.08W 80 43 N 56.53 W 9.03 6611.86N 4039.19W 81 41 N 57.14 W 8.16 6619.43N 4050.77W . 83 51 N 57.21 W 6.75 6636.63N 4077.45W 84 47 N 60.40 W 10.67 6652.61N 4103.83W 7709.30 7724.07 7736.99 7766.57 7794.99 12512 8758.90 8697.20 12543 8762.21 8700.51 12573 8765.90 8704.20 12612 8771.11 8709.41 12635 8774.26 8712.56 84 15 N 63.30 W 8.90 6668.10N 4132.79W 83 29 N 65.40 W 7.17 6681.44N 4160.57W 82 24 N 66.59 W 5.33 6693.56N 4187.77W 82 13 N 66.68 W .54 6708.88N 4223.25W 82 3 N 66.91 W 1.21 6717.86N 4244.19W 7824.53 7851.63 7877.40 7910.63 7930.19 12667 8778.18 8716.48 12699 8780.80 8719.10 12732 8782.24 8720.54 12833 8784.23 8722.53 12862 8784.40 8722.70 83 52 N 66.07 W 6.23 6730.53N 4273.31W 86 43 N 66.00 W 8.94 6743.48N 4302.45W 88 15 N 66.45 W 4.80 6756.77N 4332.61W 89 30 N 66.45 W 1.24 6797.12N 4425.18W 89 48 N 66.45 W 1.03 6808.70N 4451.76W 7957.53 7985.11 8013.58 8100.56 8125.54 12894 8784.29 8722.59 12926 8783.85 8722.15 12957 8783.25 8721.55 12989 8782.46 8720.76 13020 8781.56 8719.86 90 34 N 66.49 W 2.41 6821.63N 4481.46W 91 0 N 66.40 W 1.38 6834.32N 4510.57W 91 13 N 66.30 W .74 6846.85N 4539.17W 91 35 N 65.19 W 3.62 6860..10N 4568.59W 91 43 N 65.40 W .80 6873.09N 4596.80W 8153.44 8180.79 8207.72 8235.71 8262.78 13052 8780.78 8719.08 13082 8780.14 8718.44 13115 8779.08 8717.38 13147 8777.68 8715.98 13179 8776.46 8714.76 91 5 N 66.00 W 2.74 6886.04N 4625.50W 91 17 N 65.50 W 1.74 6898.65N 4653.50W 92 28 N 64.70 W 4.46 6912.19N 4682.65W 92 24 N 64.90 W .65 6926.18N 4712.38W 92 0 N 64.50 W 1.77 6939.81N 4741.22W 8290.11 8316.75 8344.81 8373.59 8401.54 13210 8775.35 8713.65 13241 8774.28 8712.58 13272 8773.25 8711.55 13304 8772.01 8710.31 13333 8770.75 8709.05 92 5 N 64.30 W .72 6953.23N 4769.23W 91 54 N 63.90 W 1.47 6966.53N 4796.63W 91 54 N 63.50 W 1.29 6980.29N 4824.46W 92 30 N 62.30 W 4.13 6995.06N 4853.34W 92 35 N 63.50 W 4.25 7007.95N 4878.51W 8428.85 8455.70 8483.17 8512.07 8537.28 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 MIND SURVEY JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 13365 8769.48 8707.78 91 54 N 63.70 W 2.25 7022.30N 4907.42W 8565.86 13397 8768.42 8706.72 91 54 N 63.50 W .62 7036.52N 4936.07W 8594.18 13429 8767.27 8705.57 92 18 N 63.00 W 2.04 7050.64N 4964.09W 8622.06 13460 8766.05 8704.35 92 5 N 62.40 W 1.99 7065.17N 4992.23W 8650.34 13492 8765.15 8703.45 91 11 N 63.90 W 5.59 7079.30N 5020.15W 8678.16 13523 8764.60 8702.90 90 48 N 64.40 W 2.03 7093.07N 5048.58W 8706.00 13554 8764.15 8702.45 90 54 N 64.10 W 1.03 7106.38N 5076.16W 8732.96 13586 8763.47 8701.77 91 30 N 64.20 W 1.90 7120.35N 5104.99W 8761.18 13617 8762.51 8700.81 92 0 N 63.60 W 2.47 7134.23N 5133.33W' 8789.05 13649 8761.42 8699.72 92 0 N 63.80 W .64 7148.11N 5161.42W 8816.78 13680 8760.35 8698.65 91 54 N 63.60 W .71 7162.03N 5189.58W 8844.57 THE CALCULATION PROCEDURES ARE BASED ON THE USE THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8844.57 FEET AT NORTH 35 DEG. 55 MIN. WEST AT MD = 13680 OF VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 324.07 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -61.70 .00 N .00 E 1000 997.56 935.86 43.96 N 5.38 W 2000 1977.45 1915.'75 231.24 N 57.63 W 3000 2914.04 2852.34 559.49 N 165.70 W 4000 3736.67 3674.97 1088.13 N 350.09 W .00 2.44 2.44 22.55 20.10 85.96 63.41 263.33 177.37 5000 4417.92 4356.22 1724.79 N 705.74 W 6000 5061.48 4999.78 2403.84 N 1058.54 W 7000 5689.36 5627.66 3093.15 N 1419.66 W 8000 6342.60 6280.90 3757.74 N 1781.79 W 9000 6998.72 6937.02 4407.09 N 2165.84 W 582.08 318.75 938.52 356.44 1310.64 372.12 1657.40 346.75 2001.28 343.89 10000 7567.75 7506.05 5050.90 N 2674.81 W 11000 8099.02 8037.32 5705.01 N 3213.03 W 12000 8623.98 8562.28 6364.07 N 3750.15 W 13000 8782.17 8720.47 6864.44 N 4577.97 W 13680 8760.35 8698.65 7162.03 N 5189.58 W 2432.25 430.96 2900.98 468.73 3376.02 475.04 4217.83 841.81 4920.27 702.44 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 8 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 0 .00 -61.70 .00 N .00 E .00 61 61.70 .00 .00 S .00 E .00 161 161.70 100~00 .05 S .46 E .00 261 261.70 200.00 .27 S 1.07 E .00 361 361.70 300.00 1.11 S 1.77 E .01 VERTICAL CORRECTION .00 .00 .00 .01 461 461.70 400.00 2.14 S 2.37 E .02 561 561.70 500.00 .25 S 2.32 E .04 662 661.70 600.00 6.70 N 1.39 E .31 762 761.70 700.00 17.76 N .26 W .93 863 861.70 800.00 29.20 N 2.08 W 1.60 .01 .02 .27 .62 .67 963 961.70 900.00 40.07 N 4.38 W 2.22 1064 1061.70 1000.00 51.27 N 7.26 W 2.88 1165 1161.70 1100.00 64.06 N 10.42 W 3.76 1266 1261.70 1200.00 80.14 N 13.61 W 5.11 1368 1361.70 1300.00 97.95 N 18.19 W 6.79 .62 .67 .87 1.35 1.68 1470 1461.70 1400.00 115.76 N 25.04 W 8.60 1572 1561.70 1500.00 134.26 N 31.33 W 10.49 1674 1661.70 1600.00 154.35 N 38.06 W 12.71 1777 1761.70 1700.00 177.70 N 44.37 W 15.60 1880 1861.70 1800.00 201.88 N 50.61 W 18.67 1.81 1.89 2.22 2.89 3.07 1983 1961.70 1900.00 227.10 N 56.55 W 21.97 2087 2061.70 2000.00 254.17 N 63.63 W 25.83 2192 2161.70 2100.00 284.07 N 71.63 W 30.51 2297 2261.70 2200.00 314.80 N 80.13 W 35.47 2402 2361.70 2300.00 346.29 N 90.04 W 40.78 3.30 3.85 4.68 4.96 5.32 2509 2461.70 2400.00 381.53 N 105.26 W 47.93 2616 2561.70 2500.00 415.75 N 121.29 W 54.84 2723 2661.70 2600.00 450.28 N 135.27 W 61.55 2831 2761.70 2700.00 490.30 N 148.35 W 70.07 2942 2861.70 2800.00 535.91 N 160.34 W 80.64 7.15 6.91 6.72 8.52 10.57 3052 2961.70 2900.00 581.18 N 171.24 W 90.96 3164 3061.70 3000.00 629.43 N 183.75 W 102.72 3279 3161.70 3100.00 684.03 N 197.37 W 117.47 3397 3261.70 3200.00 744.39 N 214.12 W 135.49 3518 3361.70 3300.00 809.71 N 234.39 W 156.65 10.31 11.76 14.75 18.02 21.16 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 9 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 INTERPOLATED VALUES FOR EVEN 100 DATE OF SURVEY: 061294 JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3642 3461.70 3400.00 3769 3561.70 3500.00 3900 3661.70 3600,00 4033 3761.70 3700.00 4166 3861.70 3800.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 879.29 N 258.22 W 952.05 N 287.03 W 1029.21 N 321.27 W 1107.69 N 359.79 W 1185.63 N 401.29 W MD-TVD VERTICAL DIFFERENCE CORRECTION 180.81 24.15 207.81 27.00 238.69 30.88 271.52 32.83 304.94 33.43 4304 3961.70 3900.00 4450 4061.70 4000.00 4602 4161.70 4100.00 4760 4261.70 4200.00 4914 4361.70 4300.00 1268.47 N 448.55 W 1359.55 N 503.15 W 1456.74 N 562.82 W 1563.54 N 623.48 W 1667.60 N 676.57 W 343.16 38.22 389.06 45.89 440.76 51.71 499.15 58.39 552.96 53.81 5067 4461.70 4400.00 5223 4561.70 4500.00 5380 4661.70 4600.00 5538 4761.70 4700.00 5693 4861.70 4800.00 1769.34 N 730.06 W 1874.79 N 787.77 W 1981.71 N 843.87 W 2090.71 N 899.51 W 2196.52 N 953.92 W 605.33 52.37 661.70 56.36 718.48 56.79 776.52 58.04 831.96 55.44 5846 4961.70 4900.00 6000 5061.70 5000.00 6160 5161.70 5100.00 6322 5261.70 5200.00 6481 5361.70 5300.00 2299.09 N 1006.45 W 2404.08 N 1058.67 W 2515.22 N 1116.94 W 2628.01 N 1175.42 W 2737.99 N 1232.47 W 884.54 52.58 938.65 54.11 999.12 60.46 1060.80 61.69 1120.02 59.22 6639 5461.70 5400.00 6799 5561.70 5500.00 6956 5661.70 5600.00 7113 5761.70 5700.00 7268 5861.70 5800.00 2845.22 N 1291.60 W 2955.18 N 1350.26 W 3062.74 N 1405.26 W 3172.27 N 1457.96 W 3276.80 N 1513.66 W 1178.12 58.10 1237.92 59.80 1294.75 56.83 1352.15 57.40 1407.18 55.04 7419 5961.70 5900.00 7572 6061.70 6000.00 7724 6161.70 6100.00 7876 6261.70 6200.00 8029 6361.70 6300.00 3374.94 N 1569.26 W 3476.51 N 1624.82 W 3575.99 N 1681.43 W 3675.99 N 1736.90 W 3776.58 N 1792.97 W 1457.93 50.75 1510.92 52.99 1562.92 52.00 1614.83 51.91 1667.37 52.53 8181 6461.70 6400.00 8334 6561.70 6500.00 8485 6661.70 6600.00 8636 6761.70 6700.00 8787 6861.70 6800.00 3875.25 N 1852.12 W 3975.48 N 1910.92 W 4073.74 N 1967.43 W 4170.56 N 2023.53 W 4269.23 N 2080.54 W 1719.80 52.43 1773.11 53.31 1824.27 51.16 1874.34 50.08 1925.95 51.61 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 10 PRUDHOE BAY DRILLING PBU/ll-30 500292248400 NORTH SLOPE COMPUTATION DATE: 6/13/94 DATE OF SURVEY: 061294 JOB NUMBER: AK-MW-40050 KELLY BUSHING ELEV. = 61.70 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8941 6961.70 6900.00 4369.83 N 2140.81 W 1980.11 54.15 9101 7061.70 7000.00 4472.50 N 2210.07 W 2039.31 59.21 9267 7161.70 7100~00 4580.66 N 2288.61 W 2106.27 66.96 9440 7261.70 7200.00 4691.41 N 2374.26 W 2178.33 72.06 9615 7361.70 7300.00 4802.93 N 2465.14 W 2253.54 75.21 9797 7461.70 7400.00 4917.06 N 2565.96 W 2335.74 82.20 9988 7561.70 7500.00 5043.17 N 2668.64 W 2426.70 90.95 10180 7661.70 7600.00 5168.88 N 2773.65 W 2518.61 91.92 10372 7761.70 7700.00 5295.08 N 2878.46 W 2610.75 92.13 10561 7861.70 7800.00 5417.63 N 2981.44 W 2699.49 88.75 10747 7961.70 7900.00 5539.96 N 3080.30 W 2785.87 86.38 10931 8061.70 8000.00 5660.99 N 3177.00 W 2870.27 84.39 11113 8161.70 8100.00 5778.47 N 3272.30 W 2951.60 81.34 11293 8261.70 8200.00 5894.58 N 3367.16 W 3031.83 80.23 11476 8361.70 8300.00 6015.13 N 3460.98 W 3114.43 82.60 11666 8461.70 8400.00 6141.86 N 3561.62 W 3204.69 90.26 11870 8561.70 8500.00 6278.26 N 3675.49 W 3308.58 103.89 12092 8661.70 8600.00 6424.56 N 3808.31 W 3430.35 121.77 12538 8761.70 8700.00 6679.52 N 4156.42 W 3776.70 346.35 12560 8764.18 8702.48 6688.44 N 4175.94 W 3795.82 19.12 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) ,POINTS ARCO Alaska, Inc. Date' Subject: From/Location- Telephone: To/Location- August 31, 1994 ARCO Open Hole Finals Karla Zuspan/ATO- 1529 (907) 263-4310 Distribution P.O. Box 100360, .-.:~chorage, AK Transmittal #: 94102 99510,~ ~. Well Number 11-30 Log Date (M-D-Y) 6-12-94 Tool Type Run, Scale MWD/MD: DGR, 1-6, 2" & 5" EWR-P4, FXE Contractor Sperry 11-30 6-12-94 ~ MWD/TVD: DGR, 1-6, 2" & 5" Sperry ! i CN, SFD, CAL 11-30 6-12-94 ! MWD/TVD' DGR, i 1-6, 2" & 5" Sperry ~ ~ EWR-P4, FXE Number of Records: 3 Note- Neutron and Density TVD Logs have been re-plotted due to a 2' discrepancy in TVD on the original distribution. Karla Zuspan Distribution- Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska Mobil D & M PB Well Files Please a~ge re~?~)hsigning and returning a copy,.,.. ~ bf (trafCi,,s~.,jttal.,, .~ ,,,~- ~ .... .,. By: //q,-,, ~"O/7o -"~.T/nr. '". ARCO Alaska, Inc. Is a Subsidiary of AtlanflcRIchfleldCompany ARCO Alaska, Inc. Date: Subject: From/Location: Telephone: To/Location- P.O. Box 100360, ,.,nchorage, AK July 6, 1994 Transmittal #: ARCO Open Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution 94053 99510~ ~. Well Log Date Number (M-D-Y) 5-10A 6-17-94 5-10A "/'6-17-94 %." ,-'5-10A 11-30 11-30 11-3O t 1-30 11-30 ,/15-37 5-37 1/5-37 i Tool Type i Run, Scale iv/ CN/GR ~ 1,2"(~r5'' I/z-DEN/CN/GR ! 1,2 6--17--94 i / SSTVD i 1,2"&5" 6--12--94 I MWD, MD: I 1--6, 2"&5" DGIR/CNP/SFD/ i i~ CAL 6-12-94 iD/GRfCNP/SFD/iMWD'TVD: f 1-6,2"&5" I/' CAL ' DGR/EWR/FXE ~ 1' ,DGR, EWR,FXE : 6-24-94 ,,/' BOREHOLE i 1 6-24-94 1 SSTVD ! 1,2"&5" 6-24-94 i/ DLL/GR/SP i 1,2"&5" Z-DEN/ i 1,2 &5 ~t CN/GR/CAL Contractor ATLAS ATLAS ATLAS SPERRY SPERRY SPERRY SPERRY SPERRY ATLAS ATLAS ATLAS ATLAS Number of Records: John E. DeGrey Distribution: Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska Mobil D & M PB Well Files Please ackn°w.~e ~signing and returning a copy of transm ittal.~c~,.~(,.L/~(4,///,,,~, By: Date: ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany SPERRY-SUN DRILLING SERVICES LOGGING SYSTEMS Anchorage, Alaska FINAL END OF WELL LOGS and DATA ARCO ALASKA, INC Well 11-30, Nabor$ 28E Prudhoe Bay Unit, Alaska June 1994 CONFIDENTIAL PREPARED FOR: ARCO Alaska, Inc. PREPARED BY: W.A. Shepherd Sperry-Sun Drilling Services Logging Systems Anchorage, Alaska The following information was derived from in house evaluations of well cuttings caught at the Nabors 28E rig site during the drilling of well 11-30. The lithological evaluation was performed for the Horizontal / Slimhole section. The Engineer and Sample Catcher on location performed their duties on a twelve hour tour basis. The method of lag calculations used for depth tagging is considered crude, but fairly effective with limited operational means. Sample evaluations were performed by W.A. Shepherd, Sperry-Sun Drilling Services' Geologist/Logging Engineer, inhouse at our Anchorage lab. W.A. was able to give an interpretive analysis of lithology by utilizing FE/MWD data recorded from the wellsite. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing __ Repair well__ Plugging __ 'lqme extension __ Stimulate __ Change approved program X Pull tubing __ Variance __ Perforate __ Other__ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory __ Stratigraphic __ Service 4. Location of well at surface 1185' NSL, 383' WEL, SEC. 28, T11N, R15E At top of productive interval 2689' NSI~ 4870' WEL, SEC. 21, T11N, R15E At effective depth At total depth 2903' NSL, 45' WEL, SEC. 20, T11N, R15E 6. Datum elevation (DF or KB) KBE = 60 7. Unit or Property name Prudhoe Bay Unit 8. Well number 11-30 9. Permit number 94-77 10. APl number 50- 029-22484 11. Field/Pool Prudhoe Bay Field/Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 13354 feet 8770 feet feet feet Casing Length Size Structural Conductor 76' 20" Surface 3947' 13-3/8" Intermediate Production 11361' 9-5/8" Liner Perforation depth: measured None true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None Plugs (measured) Junk (measured) Cemented 260 sx Arcticset (Approx.) 1561 sx CS 111/375sx 'G" 775 sx Class "G" Measured depth True vertical depth 110' 110' 3982' 3722' 11393' 8318' Gas Cons. Commissi¢ Anchorage 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 6/11/94 16. If proposal was verbally approved Name of approver B. Wondze// 6/10/94 Date approved 15. Status of well classification as: Oil x Gas Suspended __ Service ify~, ~/;nd correct 17. I hereby cert the foregoing is to the best of my knowledge. Signed ~:~.t ~ ~'~ ~' TitleDrillingEngineerSupervisor FOR COMMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity__ BOP Test~ Location clearance ~ Mechanical Integrity Test__ Subsequent form required 10- ~;O' 7 Original Signea Approved by order of the Commission David W, Johnstor, [Approval No~;;~/..7,/._/,5'"--5'--- / Commissioner Date Form 10-403 Rev 06/15/88 Approved Copy Returned SUBMIT IN TRIPLICATE DS 11-30 Well Plan Revision 1. Drill 6" hole to TD as per onsite geologist. POOH. ' 2. PU 100' of Atlas dp-conveyed perforating guns (5 spf). TIH. Set Baker packer & perforate from 12,820'-12,720' (5' f/btm of 7" liner). Guns should fire with annulus pressure of 1500-2000 psi. 3. Make hole opener/casing scraper run as per recommended practices. 4. Follow well plan as planned. Drilling Engineer Approved by: Adr~n Clark Dr'Ming Engineer Supervisor RECEIVED JUN 1 3 1994 (Jil & 6as Cons. Commission Anchorage VHH June 10, 1994 MEMORANDUM State et Alaska Alaska Oil and Gas Conservation Commission TO: David Johann, Chairrn~~ DATE: June 3, 1994 THRU: Blair Wondzell, .4~J~u.3,- FILE NO: P. !. Supervisor FROM: Doug Amos, 'D~ ~ SUBJECT: Petroleum Inspector afrhfcbd.doc BOPE Test Nabors 28E Arco PBU DS11-30 Prudhoe ~ PTD No. Thursday, ,June 2, 1994: I traveled to Arco' s PBU DS11-30 well to witness the BOPE test on Nabors Rig No. 28E. Friday, June 3, 1994: The test was delayed until 6:00 AM due to casing pack off problems. As the attached AOGCC BOPE Test Report indicates, there were no failures. However the H2S Detection System was due for calibration. I was contacted on 6/4/94 and informed that the system had been calibrated. I found the rig equipment and location in good' condition. Sumrnarv: I witnessed the BOPE test at Arco's PBU DS11-30 well on Nabors 28E. Test time 2 hours, no failures, 23 valves tested. Attachment AFRHFCBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Ddg: X Workover:~ Drlg Contractor: Nabors Ddlling Rig No. Operator: Arco Alaska Inc. Well Name: PBU DS11-30 Casing Size: 9 5/8" Set @ 11,393 Test: Initial Weekly X Other , 28E PTD # Rep..' Rig Rep.: Location: Sec. DATE: 6/3/94 94-77 Rig Ph.# 059-4863 James Carlile Mike Downey 28 T. 11N R. 15E Meridian Umiat Test MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) Reserve Pit N/A , Well Sign OK Drl. Rig OK BOP STACK: Quan. Annular Preventer 1 , , Pipe Rams '1 Lower Pipe Rams Blind Rams Choke Ln. Valves 1 HCR Valves 2 Kill Line Valves Check Valve 0 Test Pressure P/F 300/3,000 P , , 500/5,000 P P 500/5,000 500/5,000 500/5,000 N/A /V/A MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK , , , Flow Indicator OK OK Meth Gas Detector OK ' OK H2S Gas Detector See Remaks OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure P/F I 500/5,000 P 1 500/5,000 500/5,000 500/5,000 P P Test CHOKE MANIFOLD: Pressure P/F No. Valves 17 I 500/5,000 P No. Flanges 42I 500/5,000 P Manual Chokes 2 Functioned P. Hydraulic Chokes 1'. Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 8 ~ 2,000 3,000 J P 1,5oo ' P minutes 19 sec. minutes 3g sec. Yes Remote: Yes Psig. Number of Failures: I ,Test Time: 2.0 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within f days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7,542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433 I I I I I , I I II I I REMARKS: H2S det~. ors, were due for calibration, but functioned properly. Good Test Rig in good shape!/. 6/4/94 H2S Detect~)rs were calibrated. Distribution: odg-Well File c - OperJRig c - Database c - Tdp Rpt File c - Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO II Waived By: Witnessed By: Doug Amos FI-021L (Rev. 7/19) AFRHFCBD.XLS ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 May 20, 1994 Terry Jordan, Drlg Engr Spvr ARCO Alaska Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Company Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit 11-30 ARCO Alaska Inc 94-77 1185'NSL, 383'WEL, Sec 28, T11N, R15E, UM 2903'NSL, 45'WEL, Sec 20, TllN, R15E, UM Dear Mr Jordan' Enclosed is the approved application for permit to ddll the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W Johns't~n Chairman BY ORDER OF THE COMMISSION jo/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-]llb. Type of well. ExploratoryF'l Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen[]1 Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) I10. Field and Pool ARCO Alaska, Inc. KBE = 60' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28321 4. Location of well at surface 7. Unit or property Name 11. Type Bond(~,,e 20 Mc 25.025} 1185' NSI_, 383' WEL, SEC. 28, T11N, R15E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2689' NSL, 4870' WEL, SEC. 21, T11N, R15E 11-30 U-630610 At total depth 9. Approximate spud date Amount 2903' NSL, 45' WEL, SEC. 20, T11N, R15E 5/21/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth(MDa, dTVD) property line ADL 28322-45' feet No close approach feet 2560 13260' MD/8747' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure Kickoff depth 5oo feet Maximum hole an91e92.~5 o Maximum surface 3330 psig At total depth (TVD} 8800'/4,,"~'¢0 psi~ 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole -Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 76' 34' 34' 110' 110' 260 sx Arcticset (Approx.) 16" 13-3/8" 68# L-80 BTC 3962' 33' 33' 3995' 3700' 1561 sx CS III/375 sx "G"/250 sx CS II 12-1/4" 9-5/8" 47# L-80 NSCC 11805' 32' 32' 11387' 8283' 718 sx Class "G" 8-1/2" 7" 26#/29# !NT-80/CR NSCT 1403' 11237' 8203' 12640' 8771' 418 sx Class "G" 6" 4-1/2" 12. 6 13CR NSCT 721' 12520' 8771' 13241' 8745' Uncemented slotted I/ner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production MAY 1 9 1994 Liner Ai~$ka 0il & Gas Cons. Commission Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby cert. ify that..thec.,foregoing is true and correct to the best of my knowledge S~gnecl Title Ori!lin~7 Engineer Supervisor Date Only Commission U~,~ppr~o/vaI c~ate Permit Number v IAPI number See cover letter ¢¢_//_ ~p.~.p j50-0 .~_~_. ~__ :~_./--~;:"/--~ , j &/Zo/?~. for other requirements Conditions of approval Samples required [] Yes [~ No Mud Icg requireZd [] Yes ~ No Hydrogen sulfide measures [] Yes ~ No' Directional survey requ~rea !~ Yes [] NO Required working pressure for BOPE' [.32M; 1-13M. I~5M; []10M; []15M' Other: Original Signed' By by order of Appro~'ed by David W. Johnston Commissioner me commission Date Form 10-401 Rev. 12-1-85 Submit in triplicate I Well Name: IDS 11-30 Well Plan Summary I Type of Well (producer or injector): I Producer Surface Location: [l185FSL 383FEL S28 TllN R15E UM Tar§et Location:1 2689 FSL 4870 FEL S21 T11N R15E UM Bottom Hole Location: 2903 FSL 45 FEL S20 TllN R15E UM I AFE Number: 14J0265 I Estimated Start Date: I 5/21/94 I Rig: I Nabors 28E I Operating days to complete: I 32 I MD: 1~3,2~0 I I TVD: 18,74.~ I I RTE: 160.0 I Well Design (conventional, slimhole, etc.): Formation Markers: [ Conventional Horizontal Formation Tops TVD (brt) MD (brt) K-15 4870 5733 K-10 7175 9289 K-5 7745 10368 LCU 8200 11230 SAG RIVER 8230 11287 Truncated SHUBLIK 8273 11368 TSAD, ZONE 4B 8333 (+/-) 20 11524 ZONE 4/X-RAY 8396 11603 ZONE 3 8448 11732 MAY ] 9 ]994 ZONE 2C 8510 11819 ZONE 2BFFANGO 8560 11914 '"'~°"" '~" & Cons. Commission ZONE 2A 8655 12102 Upper Romeo ZONE lB 8694 12243 Lower Romeo BASE SAD 8780 (+/-) 20 N/A Horizontal Well in Zone 1 TD 8747 13260 Casing/Tubin l'rogram: Wt/l Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tb§ O.D. MD/TVD MD/TVD 30" 20" 91.5/t H40 WELD 84 34/34 110/110 16" 13 3/8" 68# L80 BIG 3962 33/33 3995/3700 12 1/4" 9 5/8" 47# L80 NSCC 11805 32/32 11387/8283 8 1/2" 7" 26/29# NT80/ NSCT 1403 11237/8203 12640/8771 6" 4 1/2" 12.6~ 13Cr NSCT 721 12520/8771 13241/8745 NA 4 1/2" 12.6~ L80 NSCT 11235 sudace 11235/ Well Plan Summary Page 1 Logging Program: Open Hole Logs: Cased HoleLogs: 8 1/2" MWD Dir/LWD GR+4 Phase Resistivity/Neutron/Density and sample catchers (Sperry Sun) from the 9 5/8" casing point to TD of the 8 1/2' hole section. 6" MWD Dir/GR and sample catchers (Sperry. Sun). None Mud Program: Special design I MI Flow Pro ® Polymer system in 6" horizontal hole section. considerations I Surface Mud Properties: [ 16" hole section Density Funnel Yield 10 sec 10 min pH Fluid {PPG} Viscosity Point gel gel Loss 8.5 100 20 15 20 8.0 15 to to to to to to to 9.2 300 60 40 80 10 25 Intermediate Mud Properties: [ 12 1/4" hole section Density Funnel Yield 10 sec 10 min pH Fluid [PPG} Viscosity Point gel gel Loss 9.2 30 10 3 10 8.5 15 to to to to to to to 10.5 50 25 10 50 10 6 Intermediate {2) Mud Properties: [8 1/2" hole section Density Funnel Yield 10 sec 10 min pH Fluid {PPG~ Viscosity Point s~el gel Loss 8.9 30 15 5 10 9 <6 to to to to to to to 9.0 50 20 10 20 10 <7 Production Mud Properties: [ 6" hole section Density Funnel Yield 10 sec 10 min pH Fluid (PPG} Viscosity Point gel gel Loss 8.9 45 35 20 25 8.5 <6 to to to to to to to 9.0 65 45 25 35 9.5 <7 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface press~e~ C E ~ V ED Diverter, BOPE and drilling fluid system schematics on file with AOGCC. MAY ] 9 1994 Directional: I KOP: 1500' ] Maximum Hole An§le: [92.65 0il & Gas Cons. Commission Anchorage I Well Plan Summary Page 2 Directional'. [KOP: 1500' I Maximum Hole Angle: 92.65 Close Approach Well: No drilling close approach The above listed wells will be secured during the close approach. M/X¥ q 9 1994 · .~,ta,~K'. -.'' a 0[[ & Gas Cons. Commission Anchorage Well Plan Summary Page 3 . , . . . . 10. 11 t2 13. 14. Notes: a. bo Operations Summary DS11-30 MIRU drilling rig. N/U diverter and function test same. Drill 16" hole with MWD to surface casing point. Run and cement sudace casing. N/D diverter and N/U BOPE and function test same to 5000/250 PSI. PU 12-1/4" BHA and RIH. Test casing to 3000 psi for 30 minutes. Drill 10' of new hole and perform a leak off test. Drill 12-1/4" h°le With MWD to intermediate casing point in the Schublik. Change Pipe Rams tO 9-5/8". Run and cement 9-5/8" production casing. BUmp the plug with 2000 psi. Check floats. Install 5" or variable rams. Test intermediate casing to 3500 psi for 30 minutes. Drill 10' of new hole and perform a leak off test.. Drill 8-1/2" hole with MWD and GR/Resistivity to horizontality and second intermediate casing point at the base of Zone 1. POH Run and cement 7" liner. Bump the plug with 2500 psi to set liner-hanger, pressure to 3500 psi to set liner-top packer Check floats. RIH with 6" bit, 4-3/4" BHA and 3-1/2" DP. Clean-out to landing collar, test liner to 3500 psi. Drill 10' of new hole, displace the well to a Xanvis system for drilling the horizontal reservoir section. Drill 6" horizontal hole with MWD and GR/ROP to TD. POH RIH with 4-1/2" slotted liner and polished riser with 2-1/16" circulating string on 3-1/2" DP, drop the dart and set slotted liner top packer with 3500 psi. Test the backside (packer) to 3500 psi. Displace the Xanvis system with sea water thru the circulating string. Spot polymer breaker in the slotted liner section. POH. RIH with scoop-top assembly overshot and set same across polished riser P/U the tubing tail, a 7-5/8" x 4-1/2" production packer, assorted GLM's, and SCSSV, and RIH to desired depth on 4-1/2" Chromium Tubing. Set the production packer and test tubing integrity. N/D BOP's, N/U the production tree and test the same. Freeze-protect the tubing and production annulus with diesel thru the shear valve located in the top GLM station. Freeze-protect the 13-1/2" X 9-7/8" annulus by bullheading dry crude. Release the Rig. Anticipated BH P: Maximum Anticipated BHP: Surface Pressure' Planned Completion Fluid' 3600 psi @ 8800 sstvd 3600 psi @ 8800 sstvd 2720 psi 8.6 ppg filtered sea water 1994 A~f,s~.4~ Ui[ & Gas Cons. C0mmissi0D · A ch0rage The drilling fluid program and surface system will conform to the regulations set for[n in 20AAC25.003. Maximum sudace pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). Based on previous logs on Drill Site 11, no potential productive zones are anticipated above 8273' TVD SS (TSAD). TWB, May 16, 1994 13-3/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 13-3/8" CIRC. TEMP 38°F PREFLUSH: 50 bbls fresh water ahead of lead slurry. SPACER: None LEAD CEMENT TYPE: Coldset III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROXIMATE SACKS: 1561 YIELD:1.92 ft3/sx MIX WATER: 10.5 gps THICKENING TIME: Greater than 4 hrs @ 50°F TAIL CEMENT TYPE- Class G ADDITIVES: 2% A-7, CaCI, FP-6L l ghs WEIGHT: 15.8 ppg YIELD:1.15 ft3/sx MIX WATER: 5.0 gps APPROXIMATE SACKS: 375 THICKENING TIME: Greater than 3 1/2 hrs @ 50°F TOP JOB CEMENT TYPE: ADDITIVES: Retarder WEIGHT: 15.6 ppg APPROXIMATE SACKS: 250 Coldset II YIELD:0.95ft3/sx MIX WATER' 3.7 gps CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry to sudace w/100% excess. 2. Tail slurry volume 375 sx 3. Top job volume 250 sx. MAY ] 9 ' 994 0il & Gas Gons. Commission Anchorage 9-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ Services CIRCULATING. TEMP: 140°F P R E F L U S H: 20 bbl fresh water S PA C E R: 70 bbls MCS-4, weighted 1 ppg above current mud weight. LEAD CEMENT TYPE: Class G ADDITIVES: A-2: 3%, FL-52: 0.4%, CD-32: 0.5%, WEIGHT: 11.0 ppg APPROXIMATE SACKS: 485 FLUID LOSS: 150-250 cc FP-12L: lghs YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps THICKENING TIME: >5 hrs @ 140°F FREE WATER: 0.0 cc TAIL CEMENT TYPE: Class G ADDITIVES: FL-52: 0.2%, WEIGHT: 15.8ppg APPROXIMATE SACKS: 233 FLUID LOSS: 100 to 150 cc/30 min CD-32: 0.5%, A2: 1%, FP-6L: lghs YIELD: 1.14ft3/sx MIX WATER' 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0.0 cc CENTRALIZER PLACEMENT: Two each 9-3/4" x 12" turbulators per joint from TD to 500'MD above TSag (SAG River is truncated) on 9-5/8" casing 11388'- 10787" MD), (28 required ). One each 9-3/4" x 12"centralizer per joint (one piece, straight blade) from 300' MD below Cretaceous to 300' MD above Cretaceous, (8443' - 6824' MD), (38 required ). One each 9-3/4" x 12" centralizer (one piece, straight blade) on first 2 joints inside 13-1/2" sudace casing shoe, (2 required). CEMENT VOLUME: 1. Lead Slurry to 500' MD above top of Produced Water Disposal zone (Cretaceous)(top PWDZ is @ 7124' MD) with 30% excess. 2. Tail Slurry to 500' MD above Top of Sag river (Sag River is truncated), (top of SAG @ 11,287' MD) with 30% excess. Gas Cons. Commissior~ Anchorage 7" INTERMEDIATE LINER CEMENT PROGRAM- BJ Services CIRC. TEMP 140° F BHST 220 deg F at 8800' TVDSS. PREFLUSH: 20 bbls Fresh water (unweighted, no additives) SPACER: 70 bbls MCS-4 per BJ specifications weighted 1.0 ppg above mud weight. CEMENT TYPE: PREMIUM ADDITIVES: BA-10: 0.8%, FL-32: 0.6%, R-1:0.35%, FP-6L: 2 ghs. WEIGHT: 15.7 ppg YIELD:1.18 ft3/sx MIX WATER: 5.03 gps APPROX #SACKS: 418 THICKENING TIME: 45 min @ surface + 3 to 4 hrs at 140 deg F. FLUID LOSS: Less than 50cc/30 min @ 140 deg F. FREE WATER: 0 mi at 45° angle Note: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencys ( if any ) of slurry when consistometer is re-started after shutdown period - additional retarder may be required - consult w/cementer. CD-30: 0.2%, A-2: 0.3%, CENTRALIZER PLACEMENT: Run 2 right hand turbolators per joint in open hole, 1 per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Pedorm fluid loss test on the batch mixed slurry. Fluid loss should be 50cc/30 min or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: . . Open hole (8-1/2" X 7") + 30% excess (adjust if a caliper Icg is run and it indicates severe washouts). 7" 26~ casing capacity below landing collar. 150' liner lap (9-5/8" x 7") 150' of cement on top of the liner in the 9-5/8" casing. R£Crcl /£F -' -~," 0[[ & Gas Cons. Commission Anchorage __, 54HI'I HLHbKH .. ,oe Bay . r" udhoe' Bo, y Un i i:: ~miLL Si.-l;e ~ 1 ! i-30 A~-bui L-t & 1-30 ~,,./p i I Pm eli mi n o.m y HHLLI~UKIUil "i P,'ALL.TBURTE]N VERTI£AL VIEW TVD R~F: WE_LWE&'~ VERTICAL SECTION REP WELLWEAD HB~IZEi, NTAL VIEW (TRUE Nni~TH) SCALE 50'3 ¢~, / I)IVfSIF,'N · SUqVEY R-5c', WELLHEAI) 2603 --! 7142 7~ 6033 4 t!lY~l_ _,. ~O 60SO ~15905033 452~3 ~3 3533 226G _PS:)2_~CE3 iF:~2 .=O~ ,I(]6)3 Z. ~ 550 RECEIVED MAY 1 9 1994 A!aska 0il & Gas Cons. Commission Anchorage 509 V'~TiCAL SECT~W PLANE' 32t,00~ -."~.,c~ P-J~T 'r.~T.A tE'3J 7.(T~ 3430~ I!~ 41 N Il v C~e..'xied By : C;~ed<ed Sy TvD 8745.CC ,~:P I43B5 !7 VS g4~B. 6¢ '4/2 7225.C3 N J -"/:,J 5931.C3 W __,~y Dciiling .,.,,--,ill ,..%i"t:e 1 ~ .L--~O A~-.buil-t i i-30 ",,.,/p i ,t Pr" eil mi n o, my Plan T~o. veUma Cytino,'~r - Nopno,[ Pkme HD. 0 - :4385 F¢. !n-t;er, vdt, 53 f"~, Alt .'~tper--l;iOt~S Re[ 1;0 Tr,~e No¢~h O~ 53D E7'~ ..... 300° 4OO 353 ! 93'3 ½ALLIBURTEN $/:9Ig4 8 _=9 on 60~ { ~ 11-37 I110 !tll 11-11 ,l-ia 1370 L3-R~ RECEIVED vlA'l' 1 9 1994 ;:,~ska Oii& Gas Cons. Commission , Anchorage J,~ITIZ-'i. ~Dm,rT DA'L ~D g CJ~V~ ~65 /,E.~o ~qO~ 3~ l~'O N 5t~ $~ ~cd / i L5~4 59,150 ; / Z~u ~ ~ ~ ' 7~ ~ Zcr,~ / ~F~T ~ t~4! ~.1~o ~3, t5o ~ ~,:~ /!~ C~ ~qvg ~ E~2-2 , .~ ~.~; ~.4~ 9745 Sc~e Ptsd:':ed : 5/: gm/gl jC-e:,.:ed Bi DOte : FRDPDSED -qH- TVD ~745,9:D I-!g : c355,17 , VS 94~. 5.CgI N4' 73~_5 C3 ~ g/%' 5931.03 ;,' WELL PERMIT CHECKLIST COMPANY //'30 UNIT# PROGRAM: exp [] dev~ redrll [] aery [] ADMINISTRATION 1. 2. 3. 4. 5. 6. x 7. 8. 9. 10. 11. 12. 13. Permit fee attached ................... Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool ............. Well located proper distance from drlg unit boundary. Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ........ Operator only affected party .............. Operator has appropriate bond in force ......... Permit can be issued without conservation order .... Permit can be issued without administrative approval. Can permit be approved before 15-day wait ....... ENGINEERIN~ APPR 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26'. 27. 28. 29. Conductor string provided ............... Surface casing protects all known USDWs ........ CMT vol adequate to circulate on conductor & surf CM~ vol adequate to tie-in long string to surf csg CMT will cover all known productive horizons ....... Casing designs adequate for C, T, B & permafrost .... Adequate tankage or reserve pit ............. If a re-drill, has a 10-403 for abndnmnt been approved. Adequate wellbore separation proposed .......... If diverter required, is it adequate .......... Drilling fluid program schematic & equip list adequate BOPEs adequate .................... BOPE press rating adequate; test to ~d~ psig.~ N Choke manifold complies w/API RP-53 (M~y 84) ...... Work will occur without operation shutdown ....... Is presence of H2S gas probable ............. GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y ~/ 31. Data presented on potential overpressure zones ..... Y /N/~/~ 32. Seismic analysis 9f shallow gas zones .......... y N .~/~,/ / , 33. Seabed condition survey (if off-shore) ......... / N ' - ' 34. Contact name/phone for weekly progress reports .... / Y N [exploratory only] ~ GEOLOGY: ENGINEERING: COMMISS ION: Comments/Instructions: Z, HOW~o - A:~FORMS~cheldist rev 03/94 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 11-30 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292248400 REFERENCE NO : 99083 RECEIVED ~',,!P,R 0 3 1999 ,davka Oit & Gas Cons. Commission An. chorage LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: **** REEL HEADER **** SERVICE NAIVE : EDIT DATE : 99/02/25 ORIGIN : FLIC REEL NA~E : 99083 CONTINUATION # : PREVIOUS REEL : CO~flViENT · ARCO ALASKA, PRUDHOE BAY, DS 11-30, API #50-029-22484-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/02/25 ORIGIN : FLIC TAPE NAME : 99083 CONTINUATION # : 1 PREVIOUS TAPE : CO~ff4ENT : ARCO ALASKA, PRUDHOE BAY, DS 11-30, API #50-029-22484-00 TAPE H~ER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NANiE : DS 11-30 API NUMBER: 5002922484 O0 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER ~ELL SERVICES TAPE CREATION DATE: 25-FEB- 99 JOB NUMBER: 99083 LOGGING ENGINEER: C. YON OPERATOR WITNESS: J. MENKE SURFACE LOCATION SECTION: 28 TOWNSHIP: 1 iN RANGE: 15E FNL: FSL: 1185 FEL: 383 FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: 61.70 DERRICK FLOOR: 60.20 GROUND LEVEL: 27.20 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 4 . 500 13696.0 12.60 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUFZBER : PASS NUMBER: DATE LOGGED .. LOGGING COMPANY: SPERRY-SUN BASELINE DEPTH .............. 88888.0 13478.0 13305.0 13269.5 13224.5 13202.5 13033.0 13021.0 12963.5 12912.5 12897.5 12854.5 12828.0 12774.0 12750.0 12736.0 12699.0 12671.5 12646.0 12603.5 12566.5 12550.0 12544.0 12528.0 12468 0 12403 5 12392 0 12319 5 12314 5 12305 5 12295 5 12287.5 12274.5 12270.0 12247.5 12227.0 12223.0 12207.0 12192.5 12185.5 12181.0 12132.5 12118.0 12104.5 12099.5 25-FEB-1999 14:36 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH ....... 88882.5 13472.5 13296.5 13261.0 13223.5 13201.0 13037.5 13025.5 12957.0 12906.5 12891.0 12852.0 12822.5 12775.0 12751.5 12736.0 12699.0 12672.5 12647.0 12604.5 12567.5 12550.0 12542.5 12526.5 12473.0 12408.0 12396.5 12324.0 12318.0 12309.0 12298.0 12290.5 12278.5 12273.5 12249.5 12230.0 12225.0 12210.5 12195.5 12188.5 12184.5 12135.5 12119.0 12107.0 12102.0 MCNL 88882 5 13472 5 13296 5 13261 0 13223 5 13201 0 13037.5 13025.5 12957.0 12906.5 12891.0 12852.0 12822.5 12775.0 12751.5 12736.0 12699.0 12672.5 12647.0 12604.5 12567.5 12550.0 12542.5 12526.5 12473.0 12408.0 12396.5 12324 0 12318 0 12309 0 12298 0 12290 5 12278 5 12273.5 12249.5 12230.0 12225.0 12210.5 12195.5 12188.5 12184.5 12135.5 12119.0 12107.0 12102.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 100.0 $ 102.5 102.5 CONTAINED HEREIN IS THE MCNL DATA ACQUIRED ON ARCO ALASKA, INC. WELL DS 11-30 ON 15-FEB-99. THE DEPTH SHIFTS SHOWN ABOVEREFLECT MCNL PASS #1 GRCH TO THE BASELINE GAMMA RAY PROVIDED BY THE CLIENT (GR.MWD); AND MCNL PASS #1 NRAT TO GR.MWD. ALL OTHER MCNL CURVES WERE CARRIED WITH THE NRAT SHIFT. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT ~001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SURmUh~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 13630.0 12082.0 MCNL 13638.0 12100.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH MCNL REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR MCNL PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 4 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6017308 O0 000 O0 0 ! 1 1 4 68 0000000000 GRCH CNT GAPI 6017308 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS 6017308 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS 6017308 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT 6017308 O0 000 O0 0 ! 1 1 4 68 0000000000 CCL CNT V 6017308 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 6017308 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 13671.000 GRCH. CNT -999.250 NCNT. CNT -999.250 FCNT. CNT -999.250 NRAT. CNT -999.250 CCL.CNT -999.250 GR.MWD 52.270 DEPT. 11266.500 GRCH. CNT -999.250 NCNT. CNT -999.250 FCNT. CNT -999.250 ArRAT. CNT -999.250 CCL.CNT -999.250 GR.MWD 107.269 END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 13638.0 12085.0 MCNL 13646.0 12102.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH MCNL 88888.0 88888.5 88884.0 13622.5 13623.0 13618.5 13618.0 13614.5 13606.5 13602.5 13602.0 13594.5 13595.0 13590.0 13592.0 13584.5 13585.5 13582.5 13554.5 13550.0 13542.0 13537.5 13536.5 13531.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 13527 13523 13502 13494 13480 5 13480 0 13472 0 13459 5 13436.5 13415 5 13413 0 13397 0 13394 5 13390 0 13371 0 13369 0 13348 5 13336.0 13318.5 13285.5 13284.0 13266.0 13259.0 13256.0 13242.0 13237.5 13235.0 13216.5 13204.5 13188.0 13178.0 13174.5 13167.5 13157.5 13152.0 13136.0 13104.5 13099.5 13089.5 13075.0 13066. 0 13063.0 13026.5 13023.5 13003.0 12994.5 12988.0 12983.5 12949.5 12925.0 12921.5 12915.0 12910.0 12899.0 12888.5 0 13521.5 5 0 13497.5 5 13476.0 13470.0 13436.5 13413.0 13394.5 13388.5 13367.5 13336.5 13317.0 13287.0 13269.5 13256.0 13239.5 13231.0 13199.5 13186.0 13174.5 13156.5 13149.5 13106.5 13093.0 13076.5 13068.5 13026.0 12987.0 12891.0 13520.0 13491.5 13476.0 13455.0 13414.0 13394.0 13369.5 13347.5 13284.5 13259.0 13236.0 13216.0 13178.5 13167.5 13136.5 131 O1.5 13064.0 13026.0 13007.0 12997.0 12981.0 12949.0 12924.5 12920.5 12915.5 12907.0 12896.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 12873.0 12856.5 12853.0 12846.0 12831.0 12827.0 12824.0 12817.0 12810.5 12807 5 12792 5 12778 0 12769 5 12766 0 12753 5 12753.0 12739.0 12735.5 12730.0 12724.0 12703.0 12684.0 12683.5 12670.5 12668.0 12644.5 12635.5 12613.0 12603.5 12595.0 12591.0 12574.5 12566.5 12560.0 12556.0 12547.0 12530.0 12523.5 12519.0 12505.5 12499 0 12492 0 12473 0 12469 0 12459 0 12450 5 12445 5 12444 0 12431.5 12426.0 12425.0 12418.0 12392.0 12391.0 12387.0 12852.0 12822.5 12808.0 12769.0 12754.5 12736.0 12687.0 12672.5 12647.0 12605.0 12597.5 12574.5 12567.5 12559.0 12550.5 12528.0 12473.0 12450.5 12429.5 12396.5 12869.0 12854.0 12843.0 12829.0 12820.5 12815.0 12807.5 12794.0 12781.0 12769.5 12757.0 12742.0 12732.0 12725.0 12705.0 12686.0 12669.5 12636.0 12614.5 12592.0 12561.0 12531.5 12519.0 12508.0 12501.0 12493.5 12478.0 12465.5 12454.0 12445.0 12434.0 12428.0 12421.0 12395.5 12392.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 12375 12369 12360 12357 12355 12347 12336. 12314.0 12312.0 12308.5 12307.0 12304.5 12301.5 12291.5 12286.5 12280.5 12268.0 12265.5 12257.0 12246.0 12243.5 12241.5 12233.5 12228.0 12211.5 12204.0 12203.0 12196.0 12186.0 12176.0 12169.0 12164.5 12159.5 12151.0 12149.0 12138.5 12132.5 12129.0 12118.0 12111.5 12099.5 12093.0 12086.0 100.0 $ 12358.5 12318.5 12311.0 12290.5 12274.0 12249.0 12245.5 12230.0 12207.0 12188.5 12163.0 12152.0 12135.5 12102.0 12096.0 12088.5 102.5 12380.5 12375.0 12365.5 12360.5 12354.0 12339.0 12315.0 12309.0 12304.0 12302.5 12292.0 12282.0 12264.5 12257.5 12244.5 12237.0 12215.0 12208.5 12200.0 12180.5 12172.5 12168.0 12155.0 12141.5 12132.0 12119.5 12114.0 102.5 REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR MCNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NRAT TO PASS #1 NRAT. ALLOTHER MCNL CURVES WERE CARRIED WITH THE NRAT SHIFT. $ # LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNT V 6017308 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 13642.000 GRCH. CNT -999.250 NRAT. CNT 17.876 CCL. CNT -999.250 DEPT. 12087.500 GRCH. CNT 182.849 NRAT. CNT -999.250 CCL.CNT 85.000 NCNT. CNT 6133. 729 FCNT. CNT 320.934 NCNT. CNT -999.250 FCNT. CNT -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 10 **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 0 O1 CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUFIBER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, MCNL $ REMARKS: THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 11 TYPE REPR CODE VALUE .............................. 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6017308 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNT GAPI 6017308 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNAV CPS 6017308 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNAV CPS 6017308 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNAV 6017308 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 13632.500 GRCH. CNT -999.250 NCNT. CNAV 6011.022 FCNT. CNAV 318.558 NURAT. CNAV 15.790 DEPT. 12084.500 GRCH. CNT NRAT. CNAV -999.250 64.754 NCNT. CNAV -999.250 FCNT. CNAV -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 12 **** FILE HEADER FILE NA~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : MCNL LOG HEADER DATA FILE HEADER FILE NTJM~ER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCP~ENT: 0.1000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 13658.65 12079.05 DATE LOGGED: 15-FEB-99 SOFTWARE VERSION: 0035E TIME LOGGER ON BOTTOM: 1634 15-FEB-99 TD DRILLER (FT) : 13719.0 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : 12100.0 BOTTOM LOG INTERVAL (FT) : 13650. 0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY MCNL COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : TOOL NUMBER GR MCNL 13696.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 13 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): THERMAL BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -110 FAR COUNT RATE HIGH SCALE (CPS): 2090 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 32500 TOOL STANDOFF (IN): REMARKS: THIS LOG WAS DEPTH REFERENCED TO A SWS PRES/TEMP LOG DATED 16-DEC-94. ALL DEPTH CORRELATION MATERIAL AND LOGGING PROCEDURE PROVIDED BY CO. REP. LOGGING PROCEDURE IS AS FOLLOWS: WELL WAS FLOWING WHILE WE MADE SPIN/TEMP/PRESS PASSES IN 13700'-12100' INTERVAL FOR GAS DETERMINATION. PASS 1 WAS DOWN PASS AT 60 FPM. PASS 2 WAS UP PASS AT 60 FPM. WELL CONDITIONS WHILE LOGGING WERE: OIL: 1665 STBOPD TOTAL GAS: 32645 MSCF/D WATER: SBWPD GOR: 19610 SCF/B WATER CUT: O¢ WELL WAS THEN SHUT-IN AND KILLED FOR CNL PASSES. KILLED WITH 250 BBL KCL. CNL PASS #1 WAS UP PASS @ 30 FPM WHILE PUMPING KCL AT 1.5 BPD. CNL PASS #2 WAS UP PASS @ 30 FPM WHILE PUMPING CRUDE AT 1.0 BPD. TOTAL FLUIDS PUMPED FOR CNL LOGGING WERE 375 BBL KCL AND 250 BBLS CRUDE. INTERVAL LOGGED WAS 13650'-12100'. THIS FILE CONTAINS THE RAW MCNL DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 14 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 CVEL FL1 F/HR 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 GR FL1 GAPI 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT FL1 CPS 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT FL1 CPS 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT FL1 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 CCLD FL1 V 6017308 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 13658.650 CVEL.FL1 -999.250 GR.FL1 -999.250 NCNT. FL1 FCNT.FL1 -999.250 NRAT. FL1 -999.250 CCLD.FL1 -999.250 DEPT. 12079.051 CVEL.FL1 -999.250 GR.FL1 -999.250 NCNT. FL1 FCNT. FL1 -999.250 NRAT. FL1 -999.250 CCLD.FL1 84.793 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 15 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE · 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE · 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.1000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 13664.62 12081.82 MCNL LOG HEADER DATA DATE LOGGED: 15-FEB- 99 SOFTWARE VERSION: 0035E TIME LOGGER ON BOTTOM: 1634 15-FEB-99 TD DRILLER (FT) : 13719.0 TD LOGGER (FT) : TOP LOG INTERVAL (FT) : 12100.0 BOTTOM LOG INTERVAL (FT) : 13650.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAM~VA RAY MCNL COMP. NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER GR MCNL LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 16 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 13696.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -110 FAR COUNT RATE HIGH SCALE (CPS): 2090 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 32500 TOOL STANDOFF (IN): REMARKS: THIS LOG WAS DEPTH REFERENCED TO A SWS PRES/TEMP LOG DATED 16-DEC-94. ALL DEPTH CORRELATION MATERIAL AND LOGGING PROCEDURE PROVIDED BY CO. REP. LOGGING PROCEDURE IS AS FOLLOWS: WELL WAS FLOWING WHILE WE MADE SPIN/TEMP/PRESS PASSES IN 13700'-12100' INTERVAL FOR GAS DETERMINATION. PASS 1 WAS DOWN PASS AT 60 FPM. PASS 2 WAS UP PASS AT 60 FPM. WELL CONDITIONS WHILE LOGGING WERE: OIL: 1665 STBOPD TOTAL GAS: 32645 MSCF/D WATER: SBWPD GOR: 19610 SCF/B WATER CUT: WELL WAS THEN SHUT-IN AND KILLED FOR CNL PASSES. KILLED WITH 250 BBL KCL. CNL PASS #1 WAS UP PASS @ 30 FPM WHILE PUMPING KCL AT 1.5 BPD. CNL PASS #2 WAS UP PASS @ 30 FPM WHILE PUMPING CRUDE AT 1.0 BPD. TOTAL FLUIDS PUMPED FOR CNL LOGGING WERE 375 BBL KCL AND 250 BBLS CRUDE. INTERVAL LOGGED WAS 13650'-12100'. LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 17 THIS FILE CONTAINS THE RAW MCNL DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG _TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 CVEL FL2 F/HR 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 GR FL2 GAPI 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 NCNTFL2 CPS 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 FCNTFL2 CPS 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 NRAT FL2 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 CCLDFL2 V 6017308 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 13664.617 CVEL.FL2 -999.250 GR.FL2 -999.250 NCNT. FL2 FCNT. FL2 -999.250 NNAT. FL2 -999.250 CCLD. FL2 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-FEB-1999 14:36 PAGE: 18 DEPT. 12081.816 CVEL.FL2 -999.250 GR.FL2 FCNT. FL2 -999.250 NRAT. FL2 -999.250 CCLD.FL2 -999.250 NCNT. FL2 85.000 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/02/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/02/25 ORIGIN · FLIC TAPE NAME : 99083 CONTINUATION # : 1 PREVIOUS TAPE : COICkrlENT : ARCO ALASKA, PRUDHOE BAY, DS 11-30, API #50-029-22484-00 **** REEL TRAILER **** SERVICE NA~E : EDIT DATE : 99/02/25 ORIGIN : FLIC REEL NA~E : 99083 CONTINUATION # : PREVIOUS REEL : CO~4~ENT · ARCO ALASKA, PRUDHOE BAY, DS 11-30, API #50-029-22484-00 q. oq"'/ * ALASKA COMPUTING CENTER * * . ****************************** * ............................ . * ....... SCHLUMBERGER ' * * ............................ * ****************************** COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 05-18A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292196001 REFERENCE NO : 98636 RECEIVED JAN i 5 1999 Alaska Oil & Gas Cons. Commission :..) LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 98/12/28 ORIGIN : FLIC REEL NA~E : 98636 CONTINUATION # : PREVIOUS REEL .. CO~!ENT : ARCO ALASKA, PRUDHOE BAY, DS 05-18A, API #50-029-21960-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/12/28 ORIGIN : FLIC TAPE NAME : 98636 CONTINUATION # : 1 PREVIOUS TAPE '. COMMENT : ARCO ALASKA, PRUDHOE BAY, DS 05-18A, API #50-029-21960-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS 05-18A API NUMBER: 500292196001 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 28-DEC-98 JOB NUMBER: 98636 LOGGING ENGINEER .. HERRMANN OPERATOR WITNESS: D. REEM SURFACE LOCATION SECTION: 32 TO~FNSHIP: 1 iN RANGE: 1SE FNL : FSL: 2946 FEL: FWL: 1133 ELEVATION(FT FROM MSL O) KELLY BUSHING: 68. O0 DERRICK FLOOR: 67. O0 GROUND LEVEL: 36. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 3. 500 8827.0 9.30 2ND STRING 2. 375 9593.0 4.43 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS ArUMBER : DATE LOGGED: 1 -AUG- 89 LOGGING COMPANY: WESTERN ATLAS .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH MCNL 88888.0 88888.5 88888.5 8884.0 8884.5 8884.5 100.0 100.5 100.5 $ REMARKS: CONTAINED HEREIN IS THE MCNL DATA ACQUIRED ON ARCO ALASKA, INC. WELL DS 05-18A ON 5-NOV-98. THE DEPTH SHIFTS SHOWN ABOVE REFLECT MCNL PASS #1 GRCH TO THE BASELINE GAMMA RAY PROVIDED BY THE CLIENT (GR.BCS) ; AND MCNL PASS #1 NRAT TO GR.BCS. ALL OTHER MCNL CURVES WERE CARRIED WITH THE NRAT SHIFT. NO SHIFTS WERE APPLIED BELOW THE KICK-OFF POINT OF 8890'. *NOTE: ONLY PASSES #1 AND #3 ARE PRESENTED ON THE BLUE- LINE. ACCORDING TO THE LOGGER, THEY WERE NOT PUMPING DURING THE SECOND LOGGING PASS, AND WITH THE LINER LEAK THE PASSES DID NOT OVERLAY. SO PASS #2 DATA WAS NOT PRESENTED ON THE BLUELINE. NOR WAS IT FURNISHED FOR THIS EDIT. FOR THE PURPOSES OF THIS EDIT, THE DATA ACQUIRD DURING PASS #3 WILL BE CONSIDERED PASS #2. $ PAGE: **** FILE HEADER **** FILE NAt4E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 1 DEPTH INCREMENT: 0.5000 FILE SUFk~a~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9514.0 8515.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: MCNL 9522.0 8515.0 $ CURVE SHIFT DATA - PASS TO PASS (~ASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH MCNL .............. REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR MCNL PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNT GAPI 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) FCNT CNT CPS 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CArT 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNT V 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 0000000 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9522.500 GRCH. CNT -999.250 NCNT. CNT 5545.472 FCNT. CNT NILAT. CNT 25.292 CCL. CN~f -999.250 GR.BCS -999.250 DEPT. 8515.500 GRCH. CNT 104.250 NCNT. CNT 1784.061 FCNT. CNT iV-RAT. CNT 46.804 CCL.CNT 85.000 GR.BCS -999.250 234.210 49.269 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE · 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUl~BER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCRE~tE1VT: 0.5000 FILE SU~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: GRCH 9510.0 8520.0 MCNL 9518.0 8520.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9511.0 9499.0 9496.5 9480.5 9476.5 9474.0 9468 0 9466 0 9450 5 9448 5 9444 0 9424 5 9409 5 9409 0 9399.5 9388.5 9374.5 9373.5 9370.0 9366.0 9356.5 9347.5 9338.0 9331.0 9319.5 9305.5 9291.5 9282.5 9273.0 9257.0 9256.5 9254.0 9248.0 9243.0 9241.0 9190.0 9166.0 9163.5 9131.5 9095.5 9079.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH MCNL 88890.5 88890.5 9499.0 9483.0 9476.0 9470.0 9452.5 9445.5 9425.5 9410.0 9387.0 9371.5 93 68.5 9335.5 9317.0 9302.5 9270.5 9253.5 9245.5 9240.0 9187.5 9163.0 9513.5 9501.5 9479.0 9468.5 9450.0 9408.5 9398.5 9387.0 9372.5 93 64.0 9353.5 9346.0 9328.5 9303.0 9288.5 9280.5 9254.0 9252.0 9238.5 9187.5 9161.5 9129.0 9093.5 9077.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 9061 9059 9026. 8994 8982 8971 8970 8961 8953 8943 8937 8935 8922 8921 8909 8894 8890 8867 8862 8859 8855 8847 8828 8822 8804 8794 8784 5 8761 5 8761 0 8752 5 8733 5 8696 0 8670.0 8662.5 8649.5 8634.5 8633.5 8627.5 8604.5 8599.5 8592.5 8589.0 8582.0 8579.0 8575.0 8572.5 8569.0 8568.5 8560.0 8555.0 8549.0 8542.0 8541.5 8532.5 8525.5 · 0 9059.0 · 0 9057.5 0 9025.5 5 8994.0 5 8982.0 0 8970.5 0 8970.0 5 8961.5 0 8955.0 0 8943.5 0 8937.5 0 8935.5 5 8922.5 5 8922.0 5 8911.5 0 8895.0 5 8891.5 0 8868.0 0 8864.0 0 8860.5 0 8856.0 0 8849.0 5 8830.0 5 8824.0 8824.5 5 8806.0 0 8795.5 8763.0 8754.5 8672.5 8652.5 8636.0 8607.0 8595.5 8592.0 8581.5 8578.0 8575.0 8571.5 8562· 5 8544.5 8535.5 8786.5 8765.5 8734.5 8698.0 8666.0 8635.0 8629.0 8602.5 8585.0 8571.0 8557.5 8550.5 8543.0 8526.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 8525.0 8528.0 8523.5 8526.0 100.0 102.5 $ 101.0 REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA FOR MCNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NRAT TO PASS #1 NRAT. ALL OTHER MCNL CURVES WERE CARRIED WITH THE ArRAT SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ................................ p ...................................................... NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 0000000 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI 0000000 O0 000 O0 0 2 1 i 4 68 0000000000 NCNT CNT CPS 0000000 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 0000000 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 0000000 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNT V 0000000 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: ** DATA ** DEPT. 9520.500 GRCH. CNT -999.250 NRAT. CNT 23.479 CCL.CNT -999.250 DEPT. 8521.000 GRCH. CNT -999.250 NRAT. CNT 48.475 CCL.CNT -999.250 NCNT. CNT NCNT. CNT 5638. 495 1835.119 FCNT. CNT FCNT. CNT 252.448 47. 972 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, MCNL THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 9 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 0000000 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNT GAPI 0000000 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNAV CPS 0000000 O0 000 O0 0 3 1 1 4 68 0000000000 FCNTCNAV CPS 0000000 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNAV 0000000 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9520. 500 GRCH. CNT -999.250 NCNT. CNAV 5719. 822 FCNT. CNAV 259. 575 NRAT. CNAV 22. 421 DEPT. 8515.500 GRCH. CNT 104.250 NCNT. CNAV -999.250 FCNT. CNAV -999.250 NRAT. CNAV -999. 250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 10 **** FILE TRAILER **** FILE NAIVE : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREM?2v~f: 0.1000 FILE SU~ff4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9531.5 8498.5 MCNL $ LOG HEADER DATA DATE LOGGED: 5 -NOV- 98 SOFTWARE VERSION: 0035D TIME LOGGER ON BOTTOM: 2041 5-NOV-98 TD DRILLER (FT) : 9593.0 TD LOGGER (FT) : 9530.0 TOP LOG INTERVAL (FT) : 8501.0 BOTTOM LOG INTERVAL (FT) : 9527.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL sTRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY MCNL COMP. NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER GR MCNL LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 11 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 8827.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THER. MAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 800 NEAR COUNT RATE HIGH SCALE (CPS): 33200 TOOL STANDOFF (IN): REMARKS: CORRELATED TO BAKER HUGHS GR DATED OCT 26, 1998. WELLBORE ABOVE LINER FILLED WITH CRUDE AND LINER FILLED WITH SEA WATER FROM RIG LEAK AT LINER TOP. PO~IPED BACKSIDE KCL TO PURGE CRUDE AND FLUID PACK THE WELLBORE. RIH TO BOTTOM (9530'). CIRCULATE DOWN COIL KCL TO PURGE LINER LOGGED INTERVAL WHILE PUMPING 1 BPM DOWN COIL GOC CONTACT @ 9206' PASS ONE AND THREE DEPTH OFFSET POSSIBLE RESULT OF HORSEHEAD DEPTH SYSTEM SKIPS. ON THE SECOND PASS THEY WERE NOT PUMPING. WITH THE LINER LEAK, THE PASSES DID NOT OVERLAY SO I DID NOT PRESENT THAT PASS. THIS FILE CONTAINS THE RAW MCNL DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 0000000 O0 000 O0 0 4 1 1 CVEL PS1 F/HR 0000000 O0 000 O0 0 4 1 1 CR PS1 GAPI 0000000 O0 000 O0 0 4 1 1 NCNTPS1 CPS 0000000 O0 000 O0 0 4 1 1 FCNT PS1 CPS 0000000 O0 000 O0 0 4 1 1 NRAT PS! 0000000 O0 000 O0 0 4 1 1 CCLD PSI V 0000000 O0 000 O0 0 4 1 ! 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 ** DATA ** DEPT. 9531.500 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT. PS1 FCNT. PS1 -999.250 NRAT. PS1 -999.250 CCLD. PS1 -999.250 DEPT. 8498.500 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT. PS1 FCNT. PS1 -999.250 N-RAT. PSI -999.250 CCLD. PS1 85.000 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 13 **** FILE TRAILER **** FILE NAFiE : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NI3Y4~ER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NIIM~ER: 2 DEPTH INCREMENT: 0.1000 # FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 9530.5 8500.5 MCNL $ # LOG HEADER DATA DATE LOGGED: 5 -NOV- 98 SOFTWARE VERSION: 0035D TIME LOGGER ON BOTTOM: 2041 TD DRILLER (FT) : 9593.0 TD LOGGER (FT) : 9530.0 TOP LOG INTERVAL (FT): 8501.0 BOTTOM LOG INTERVAL (FT) : 9527.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO) : NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY MCNL COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 5-NOV-98 TOOL NUMBER GR MCNL LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 14 DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) .' BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 8827.0 THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2200 NEAR COUNT RATE LOW SCALE (CPS): 800 NEAR COUNT RATE HIGH SCALE (CPS): 33200 TOOL STANDOFF (IN): REMARKS: CORRELATED TO BAKER HUGHS GR DATED OCT 26, 1998. WELLBORE ABOVE LINER FILLED WITH CRUDE AND LINER FILLED WITH SEA WATER FROM RIG LEAK AT LINER TOP. PO?4PED BACKSIDE KCL TO PURGE CRUDE AND FLUID PACK THE WELLBORE. RIH TO BOTTOM (9530'). CIRCULATE DOWN COIL KCL TO PURGE LINER LOGGED INTERVAL WHILE PUMPING 1 BPM DOr/~ COIL GOC CONTACT ~ 9206' PASS ONE AND THREE DEPTH OFFSET POSSIBLE RESULT OF HORSEHEAD DEPTH SYSTEM SKIPS. ON THE SECOND PASS THEY WERE NOT PUMPING. WITH THE LINER LEAK, THE PASSES DID NOT OVERLAY SO I DID NOT PRESENT THAT PASS. THIS FILE CONTAINS THE RAW MCNL DATA FOR PASS #2. (SEE TAPE HEADER CO~94ENT). $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 15 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE Nt~B NXff~B SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 CVEL PS2 F/HR 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS2 GAPI 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 NCNT PS2 CPS 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 FCNT PS2 CPS 0000000 O0 000 O0 0 5 ! 1 4 68 0000000000 i¥RAT PS2 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD PS2 V 0000000 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 9530.500 CVEL.PS2 FCNT. PS2 -999.250 NRAT. PS2 DEPT. 8500.500 CVEL.PS2 FCNT. PS2 -999.250 NRAT. PS2 -999.250 GR.PS2 -999.250 NCNT. PS2 -999.250 -999.250 CCLD.PS2 -999.250 -999.250 GR.PS2 -999.250 NCNT.PS2 -999.250 -999.250 CCLD. PS2 85.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-DEC-1998 13:52 PAGE: 16 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION . O01CO1 DATE : 98/12/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : * * * * TAPE TRAILER * * * * SERVICE NAME : EDIT DATE : 98/12/28 ORIGIN : FLIC TAPE NAME : 98636 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : ARCO ALASKA, PRUDHOE BAY, DS 05-18A, API #50-029-21960-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/12/28 ORIGIN : FLIC REEL NAME : 98636 CONTINUATION # : PREVIOUS REEL COM~F2VT : ARCO AlaSKA, PRUDHOE BAY, DS 05-18A, API #50-029-21960-01 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6552.00 HANIK/BROWN J. CARLILE 500292248400 ARCO ALASKA INC. SPERRY-SUN DRILLING SERVICES 27-DEC-95 MWD RUN 7 MWD RUN 8 HANIK/BROWN J. CARLILE HANIK/BROWN J. CARLILE MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD JACKSON/JAHN J. CARLILE MAD RUN 10 JACKSON / JAHN J. CARLILE 28 liN 15E 1185 383 61.70 60.20 27.20 MWD RUN 11 JACKSON/JAHN J. CARLILE RECEIVED OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 8.500 PRODUCTION STRING 6.000 REMARKS: 9.625 11391.0 7.000 12829.0 4.500 13719.0 MWD - GR/EWR4/CNP/SFD. ALL DEPTHS ARE MEASURED BIT DEPTHS. DATA ABOVE CASING POINT AT 11391' MD WAS LOGGED BEHIND CASING. MWD RUNS 1 - 5 WERE DIRECTIONAL ONLY. MWD RUNS 6 - 8 WERE DIRECTIONAL WITH DGR, EWR4, CNP, & SFD. MWD RUNS 9 & 11 WERE DIRECTIONAL & GAMMA RAY (NGP). NO FOOTAGE WAS DRILLED DURING MWD RUN 10. A MAD PASS WAS LOGGED AS POOH, GAMMA RAY (NGP) ONLY. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR NPHI RHOB $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 11266.0 13671.0 11222.0 12758.0 11230.0 12765.0 11243.0 12772.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: ......... EQUIVALENT UNSHIFTED DEPTH - BIT RUN NO MERGE TOP MERGE BASE 6 11391.0 11724.0 7 11724.0 12034.0 8 12034.0 12829.0 9 12829.0 13353.0 11 13353.0 13719.0 MERGED MAIN PASS. GAMMA RAY FROM MAD RUN 10 WAS USED FROM 12779 - 12790' MD. CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units GR MWD 68 i AAPI RPX MWD 68 1 OHMM RPS MWD 68 i OHMM RPM MWD 68 i OHMM RPD MWD 68 1 OHMM API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 6 NPHI MWD 68 1 PU-S 4 7 FCNT MWD 68 1 CPS 4 8 NCNT MWD 68 1 CPS 4 9 RHOB MWD 68 1 G/C3 4 10 ROP MWD 68 1 FPHR 4 11 FET MWD 68 1 HR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 239 4 90 890 01 4 90 334 31 4 90 334 30 4 90 350 01 4 90 810 01 4 90 180 01 44 Tape File Start Depth = 13720.000000 Tape File End Depth = 11220.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60013 datums Tape Subfile: 2 334 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR $ MERGED DATA SOURCE PBU TOOL CODE MAD $ REMARKS: CN WN FN COUN STAT .5000 START DEPTH 12723.0 STOP DEPTH 12790.0 MAD RUN NO. MAD PASS NO. MERGE TOP 10 1 12723.0 MERGE BASE 12790.0 MAD RUN 10. NO FOOTAGE DRILLED DURING THIS RUN. RECORDED. $ : ARCO ALASKA INC. : D.S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA ONLY GAMMA RAY WAS * FORMAT RECORD (TYPE# 64) ~ ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR MAD 68 1 AAPI 4 4 95 310 01 * DATA RECORD (TYPE# O) 1022 BYTES * Total Data Records: Tape File Start Depth = 12795.000000 Tape File End Depth = 12720.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 Minimum record length: Maximum record length: 303 datums 27 records... 62 bytes 1022 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 11266.0 EWR4 11222.0 CNP 11230.0 SFD 11243.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11670.0 11648.0 11657.0 11664.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SFD FORMATION DENSITY DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 04-JUN-94 MWD 2.16A 3.93 MEMORY 11724.0 11391.0 11724.0 0 .0 .0 TOOL NUMBER P0276CRNDG6 P0276CRNDG6 P0276CRNDG6 P0276CRNDG6 8.500 11391.0 LSND 9.10 47.0 9.8 500 6.1 1.600 .760 1.200 2.400 68.0 153.0 68.0 68.0 SANDSTONE 2.65 HOLE CORRECTION (IN) : . 000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 RPX MWD 68 1 OPIMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OPIMM 5 RPD MWD 68 1 OHMM 6 NPHI MWD 68 1 PU-S 7 FCNT MWD 68 1 CPS 8 NCNT MWD 68 1 CPS 9 RHOB MWD 68 1 G/C3 10 ROP MWD 68 1 FPHR 11 FET MWD 68 1 HR 4 4 90 310 01 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 890 01 1 4 4 90 334 31 1 4 4 90 334 30 1 4 4 90 350 O1 1 4 4 90 810 01 1 4 4 90 180 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 49 Tape File Start Depth = 11725.000000 Tape File End Depth = 11220.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 72146 datums Tape Subfile: 4 118 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 11670.0 EWR4 11648.0 CNP 11656.0 SFD 11664.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SFD FORMATION DENSITY DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: STOP DEPTH 11990.0 11968.0 11976.0 11983.0 05-JUN-94 MWD 2.16A 3.93 MEMORY 12034.0 11724.0 12034.0 0 .0 .0 TOOL NUMBER P0276CRNDG6 P0276CRNDG6 P0276CRNDG6 P0276CRNDG6 8.500 11391.0 LSND 9.10 48.0 9.4 5OO 5.8 1.800 1.000 1.350 2.700 74.0 140.0 74.0 74.0 SANDSTONE 2.65 HOLE CORRECTION (IN): .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 7. $ CN WN FN COUN STAT : ARCO ALASKA INC. : D.S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 2 RPX MWD 68 1 OHMM 3 RPS MWD 68 1 OHMM 4 RPM MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 NPHI MWD 68 1 PU-S 7 FCNTMWD 68 1 CPS 8 NCNT MWD 68 1 CPS 9 RHOB MWD 68 1 G/C3 10 ROP MWD 68 1 FPHR 11 FET MWD 68 1 HR 4 4 90 310 01 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 120 46 1 4 4 90 890 01 1 4 4 90 334 31 1 4 4 90 334 30 1 4 4 90 350 01 1 4 4 90 810 O1 4 4 90 180 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 Tape File Start Depth = 12040.000000 Tape File End Depth = 11645.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9796 datums Tape Subfile: 5 107 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 11986.0 EWR4 11964.0 CNP 11971.0 SFD 11979.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12779.0 12758.0 12765.0 12772.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SFD FORMATION DENSITY DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 07-JUN-94 MWD 2.16A 3.93 MEMORY 12829.0 12034.0 12829.0 0 .0 .0 TOOL NUMBER P0275CRNDG6 P0275CRNDG6 P0275CRNDG6 P0275CRNDG6 8.500 11391.0 LSND 9.10 47.0 9.1 5OO 5.6 1.800 1.000 1.350 1.350 74.0 145.0 74.0 74.0 SANDSTONE 2.65 sa~Xg ~0~ :g~BuaI pzosa2 ~n~xeN sa~Xg :9 :g~BuaI pzooaz ~n~u~ · ..spaooa~ ~gI 9 :sI~qns ade~ smn$~p 6~0E6 89 :apoD :Xa~unans 6uTpooap apOO uoT$~uassadaa SI~ ~a& = s~TuD q~daG aIT~ 00000~'0 = 6u~o~ds ISaS~ sIT~ 000000'096II = ~$dsG PuH sI~ ~d~A :spaoosH wSwG IW$OZ I0 08I 06 I0 018 06 I0 0~Z 06 0£ ~ZZ 06 ~ IZ ~ZZ 06 ~ I0 068 06 9 9~ 0ET 06 ~ 99 0ET 06 ~ 99 0EI 06 ~ 9~ 0EI 06 ~ I0 0IZ 06 ~ mmmmmmm pon sIO dXA dA~ AaO nad s~Tu~ saIdmes spoD IOO~ amen :S~AanD II & :aI qsd~p sdw~ Had HAaHG HNO (99 #H6X~) (/HODHH ~%UAHO~ ~ 0 0' ~DIS~ : H60~S H~HON : A~ HOHG/1H~ : 0E-II 'S'G : '3NI kQISkrl~ OOH%f : Z~AS NnoD N~ NM '8 N/1H (]MR :S~H : (zH) xoN~nO.w~ ~ : (NI) .~,~OGN~,~,S qO0,1, 000' :(NI) NOI~OMMMOO a~OH Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 12790.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13303.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 9. 10-JUN-94 MWD 2.16A 3.93 MEMORY 13353.0 12829.0 13353.0 0 .0 .0 TOOL NUMBER NGP #058 6.000 12829.0 XANVIS 9.10 12.0 9.3 41000 5.6 .000 .000 .000 .000 .0 129.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT ARCO ALASKA INC. D.S. 11-30 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 14 Tape File Start Depth = 13360.000000 Tape File End Depth = 12785.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13250 datums Tape Subfile: 7 77 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 13290.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13671.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 11. 12-JUN-94 MWD 2.16A 3.93 MEMORY 13719.0 13353.0 13719.0 0 .0 .0 TOOL NUMBER NGP #069 6.000 12829.0 XANVIS 9.10 12.0 9.1 42000 5.6 .000 .000 .000 .000 .0 133.2 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : ARCO ALASKA INC. : D.. S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR * DATA RECORD (TYPE# 0) Total Data Records: 11 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 1014 BYTES * Tape File Start Depth = 13720.000000 Tape File End Depth = 13285.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 95653 datums Tape Subfile: 8 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 10 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 12723.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): STOP DEPTH 12790.0 il-JUN-94 MWD 2.16A 3.93 MEMORY 13353.0 12723.0 12790.0 0 .0 .0 TOOL NUMBER NGP #058 6.000 12829.0 XANVIS 9.10 12.0 9.3 41000 5.6 .000 .000 .000 .000 .0 129.0 .0 .0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MAD PASS LOGGED AFTER ATTEMPTING MWD RUN 10. NO FOOTAGE WAS DRILLED. ONLY GAMMA RAY WAS RECORDED. $ : ARCO ALASKA INC. : D.S. 11-30 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F Curves: Name Tool Code Samples Units GR MAD 68 1 AAPI API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 95 310 01 1 * DATA RECORD (TYPE# 0) 1022 BYTES * Total Data Records: Tape File Start Depth = 12795.000000 Tape File End Depth = 12720.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13553 datums Tape Subfile: 9 67 records... Minimum record length: 62 bytes Maximum record length: 1022 bytes Tape Subfile 10 is type: LIS 95/12/27 01 **** REEL TRAILER **** 95/12/28 01 Tape Subfile: 10 2 records... Minimum record length: 132 bytes Maximum record length:. 132 bytes End of-execution: Thu 28 DEC 95 11:22a Elapsed execution time = 2.31 seconds. SYSTEM RETURN CODE = 0