HomeMy WebLinkAbout194-071Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS:
Scanned by~
TO RE-SCAN
Dianna Vincent Nathan Lowell
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si
Page 1 of ~
'~-.
Maunder, Thomas E (DOA)
From: Jeff Gasch@xtoenergy.com
Sent: Tuesday, February 24, 2009 12:34 PM
To: Maunder, Thomas E (DOA)
Cc: Regg, James B(DOA); Paul_Figel@xtoenergy.com
Subject: RE: XTO Energy - Platform A Conductors
Tom,
I see the issue with the A22-14LS. The repairs should have been reported on the A22-14 (185-068). If needed I
can submit a corrected 404 form. Let me know how to proceed.
We have been saving the A42-14 welibore for a possible sidetrack although I don't have a timeframe on when that
might happen.
Thanks,
Jeff Gasch
Production Engineer
XTO Energy
Office # (432) 620-6742
Cell # (432) 638-7433
Fax # (432) 687-0862
"Maunder, Thomas E (DOA)"
<tom.mau n der@alaska.gov>
02/23/2009 07:05 PM
:.-~~~~~~.~~ ~~~(~~ _ 'a. ZQO~
To ~eff_Gasch@xtoenergy.com
cc ~~Regg, James B (DOA)" <jim.regg@alaska.gov>, Paul_Figel@xtoenergy.com
Subject RE: XTO Energy - Platform A Conductors
Jeff,
i have further examined information regarding the wells you have submitted canductor repair reparts for and have
some questions.
~ A22-14LS (194-071) - Yau have reported the work as having been done on A22-14LS, howe~er A22-14LS is a
segment drilled out of A22-14 (185-068). Since A22-14 has not been plugged, the report properly shauld be for
the motherbore rather than the laterai. You will likely not have to submit a revised 404 since it may be possible ta
make the correctiflns by hand. LeYs discuss further.
A42-14 (167-041) - Our production records show that this weli has anly praduced between 1 111197 - 9/30/98
since 11/21/94. Are there any pians far this wellbore?
Thanks in advance.
Tom Maunder, PE
AOGCC
•
Page 1 of 2
Maunder, Thomas E (DOA)
From: Maunder, Thomas E (DOA) ~ ~~' ~~
Sent: Friday, August 22, 2008 10:45 AM ~(a (~ ~ ,
To: 'Jeff_Gasch@xtoenergy.com' "~ ~,„~'
Cc: Scott_Griffith@xtoenergy.com; Paul_Figel@xtoenergy.com; DOA AOGCC Prudhoe Bay
Subject: RE: XTO Energy - Platform A Conductors
Jeff,
Jim Regg and I have examined the information you have provided and it will not be necessary to submit sundries
for the work. V1fe will treat. your message as equivalent. notification. You are requested to submit 404 sundry
reports for each well covering any examination work and the ultimate repair(s). In order to have a complete
record of the work, it would be helpful if you could submit before and after photos that document the condition of
the surface casings. It appears that with the exception of A44-11 that any damages are "shallow". Prior to
finalizing the repairs on A44-11, please have the platform contact the Inspectors so that. one might travel to the
platform and examine this well. 1 will place a copy of this message in the various well files. We will took for the
404s documenting the repairs.
A further question, has anything similar been noticed on Platform C? Call or message with any questions.
Tom Maunder, PE
AOGCC
From: Jeff_Gasch@xtoenergy.com [mailto:Jeff_Gasch@xtoenergy.com]
Sent: Thursday, August 21, 2008 7:49 AM
To: Maunder, Thomas E (DOA)
Cc: Scott Griffith@xtoenergy.com; Paul_Figel@xtoenergy.com
Subject: xT0 Energy - Platform A Conductors ~~~~~ AUG ~ ~ ~~~~
Tom,
Per our conversation Tuesday and your request here is a summary of what we have found. We are unsure if we
need to file a sundry notice to repair the surface casing. Please look this over at your earliest convenience and let
us know if we need to file a sundry. We would like to begin repairs ASAP. Please contact me with any questions.
In the summer of 2007 production personnel on the platform noticed a small area of bubbling paint and rust stains
on the conductor of A32-11 R. On July 16, 2007 an ultrasonic wall thickness inspection was performed on all
conductors on both platforms (A & C). Seven conductors on Platform A were identified as having possible
corrosion and flagged for further inspection. The remaining conductors on A and all conductors on C appear to
be in good condition.
The annular space between the outside of the surface casing and inside of the conductor pipe is filled with
grout/cement to the top of the conductor. Starting in June 2008 this grout/cement has been chipped out to
varying depths on the seven wells in question to determine if any corrosion exists on the surface casing. Below is
the summary of findings for each well:
(Conductor pipe is 24" OD w/ 0.500" - 0.520" nominal wall thickness)
A11-12 (166-044) -Ultrasonic Thickness (UT) showed hole in conductor 1.5" below top and other corrosion
(0.160" wall thickness remaining) was noted. Corrosion limited to top of conductor. Grout/cement was chipped
down to 20" to inspect surface casing. Plan to weld repair conductor and re-fill conductor with grout.
A11-13RD2 (181-060) - No visible exterior corrosion on conductor. Conductor UT readings showed corrosion
8/22/2008
Page 2 of 2
limited to top of conductor with minimum reading of 0.300" thickness remaining. Grout/cement was chipped
exposing an 8" band of corrosion ranging from 0.100" to 0.350" wall thickness remaining on the 10-3/4" surface
casing (nominal wall thickness 0.350"). Plan to repair area of corrosion and re-fill annulus with grout.
"'-~` A22-14LS (194-071 j - No visible exterior corrosion on conductor. Conductor UT readings revealed corrosion
(minimum of 0.300" wall thickness remaining) which is limited to the top of the conductor. Grout was chipped
down 6" and surface casing is ready to UT test. If UT test is good then plan to re-grout surface csg x conductor
annulus.
A31-14LW (194-044) - No visible exterior corrosion on conductor. Conductor UT readings showed scattered
corrosion extending from top to 44" down. Drilled holes in the thin spots of the conductor and found 3-4' void full
of water. Cut a 9" x 10" window in conductor approximately 54" from top. Surface casing looks good at this
depth. Void extends to approximately 5-6' from top of conductor. Chipped grout from top of conductor and found
1-1/4" x 8" hole in surface casing at 20" from top. Cut window in conductor in-line with surface casing corrosion to
get a better look at the corrosion and 7-5/8" intermediate casing. The 7-5/8" intermediate casing looks good.
Surface casing corrosion appears to be limited to the top of the void area. Plan to repair surface casing by
welding fabricated sleeve over area of corrosion then fill void with grout.
A32-11 R (193-092) - 3 small holes in conductor. UT readings showed corrosion limited to top 36" of conductor
with 0.160" minimum wall thickness remaining. Chipped grout down from surface of conductor and found small
holes through surface casing. Waiting on more UT numbers to determine extent of surface casing corrosion.
Plan to find extent of corrosion, weld repair surface casing and re-fill annulus with grout.
A42-14 (167-041) - No visible exterior corrosion on conductor. UT readings showed scattered corrosion near
top with minimum wall thickness reading of 0.300". Grout was chipped to 10" depth. UT readings on the surface
casing looked good with wall thickness readings ranging from 0.333"-0.350" (nominal wall thickness of 10-3/4"
surface casing is 0.350"). Plan to re-fill with grout.
A44-11 (167-035) -Two holes found in conductor 15" from top and 7" apart. UT readings show that corrosion
extends downward. At 36" from top minimum wall thickness is 0.100". Grout was chipped down and found small
holes in surface csg. Chipped down another 2 feet and found a void in the surface casing x conductor annulus
that extends down +/-35'. This void was filled w/ water. Cut window lower in conductor and drained water.
Surface casing looks good at this depth. Plan to weld repair surface casing and fill conductor with grout to
surface.
Thanks,
Jeff Gasch
Production Engineer
XTO Energy
Office # (432) 620-6742
Cell # (432) 638-7433
Fax # (432) 687-0862
8/22/2008
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown-- Stimulate Plugging-- Perforate.-
Pull tubing __ After casing Repair well__ Other X
2. Name of Operator
Cross Timbers 0peratinq Compan.y
3. Address
210 Park Ave.,Suite 2350 0kla. Cit~v, 0K.73142
5. Type of Well:
Development X
Exploratory __
Stratigraphic __
Service --
4. Location of well at surface
Leg 1,Cond. 6,1622'N&437'W of SE Cnr o¢ Sec.11,T8N,R13W
At top of productive interval
At effective depth
~10,150'HD. 2293'S&3087'W of SE Cnr of Sec.ll,T8,R13W,
At total depth
@12880' HD,4121'S&3703'W of SE Cnr.of Sec.11,T8N,R13W,SH
6. Datum elevation (DF or KB)
116' KB
7. Unit or Property name
Middle Ground Shoal
feet
8. Well number
A22-14LS
9. Permit number/approval number
194-071
10. APl number
50- 733-10085-62
1 1. Field/Pool
HGS "G" Pool
12~ Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
12,880' feet Plugs (measured)
9,901' feet
12,880' feet Junk (measured)
9,901' feet
Casing Length Size Cemented
Structural
Conductor
Surface 1997' 13-3/8" 1100 sx
Intermediate 7737' 9-5/8" 700 sx
Production 4108' 7" 1500 sx
Liner 2730' 4-1/2" SLOT. LINER
Perforation depth: measured
9,260' - 11,126'
true vertical
Measured depth True vertical depth
0-1997'
7737'
7424'-11532'
10150'-12880'
Tubing (size, grade, and measured depth)
3-1/2", 9.3¢f, 355/NS0/LS0 EUE @ 9,150'
Packers and SSSV (~pe and measured depth)
Baker FH packer @ 9,078'. Baker FY6 SSSV @ 282'
13. Stimulation or cement squeeze summary
Intervals treated (measured) 9,260' - 11,126'
Treatment description including volumes used and final pressure Clean out/treat with 3000/gal Xyl ene.
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
266 102 0 560
183 104 I 550
Tubing pressure
80
90
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations X
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the fo, r,e'Caing is true and correct to the best of my knowledge.
Signek~~Cv~'~~ Title Sr. Engineeri ng Tech
Date 05/14/01
SUBMIT IN DUPLICATE"~~
Form 10-404 Rev 06/15/88
- 44-
ORIGINAL
DAILY OPERATIONS REPORT
WESTERN DISTRICT
WELL NAME: MGS A22-14LS
AFE #: 100434
ACCOUNTING #: 62213
ESTIMATED TD:
PBTD:
COUNTY/STATE: Cook Inlet, AK
CLASSIFICATION: CTU CLEANOUT AND XYLENE SOAK
DESCRIPTION: SECTION
CONTRACTOR: CONTRACTOR: XTO PLATFORM C
OPERATOR: CROSS TIMBERS OPERATING COMPANY
04/07/01
04/08/0i
04/09/01
o4/io/oi
o4/ii/oi
o4/i2/oi
o4/i3/oi
FIRST REPORT. Objective: CTU Cleanout And Xylene Soak.
Date First Report: 04/07/01.
RU up CTU and pressure test all equipment and lines
to 3000#'s. Hold pre-job safety meeting. RUH with 1-
1/2" coil tubing with rotating Jet nozzle (2.212).
Pumped diesel at .3 BPM while running in hole.
Stopped at 10892'. Worked Coil for 1 hour. Could not
get any deeper. POOH with CTU. Put on motor and
tapered mill (2.50). RIH with CTU and stopped at
9300'. Started pumping diesel at .3 BPM. Stopped at
10892'. Milled for 40 feet at 1.6 BPM. Went through
bridge. RIH to 12880' at .6 BPM. Dropped .5 ball and
pumped 5 bbls of diesel and xylene. Pumped 3000gals
of Xylene while POOH from 12880' to 10150' at a rate
of 41 feet p/m and 1.1 BPM. POOH to 9866' and made
small pass to 9829'. POOH and made small pass from
9310' to 9260'° POOH with CTU and rig down CTU and
secure well.
DCC: $49,882 CCC: $52,882.00
GL. 197 BO, 1 BW, 128 MCF. Inject 857 MCF. TP 90#,
CP 560#.
No test.
GL 183 BO, 1 BW, 104 MCF. Inject 880 MCF. TP 90#, CP
550#.
No Test.
No Test.
GL 176 BO, 16 BW, 133 MCF. Inject 957 MCF. TP 100#,
CP 595#.
DAILY OPERATIONS REPORT
WESTERN DISTRICT
WELL NAME: MGS A22-14LS
AFE #: 100434
ESTINLATED TD:
PBTD:
COUNTY/STATE: Cook Inlet, AK
ACCOUNTING #: 62213
CLASSIFICATION: CTU CLEANOUT AND XYLENE SOAK
DESCRIPTION: SECTION
CONTRACTOR: CONTRACTOR: XTO PLATFORM C
OPERATOR: CROSS TIMBERS OPERATING COMPANY
04/14/01
GL 214 BO, 4 BW, 231 MCF. Inject 1055 MCF. TP 95#,
CP 620#.
04/15/01 No. Test.
04/i6/0i
GL 217 BO, 1 BW, 269 MCF. Inject 1124 MCF. TP 95#,
CP 625#.
04/17/01 No Test.
o4/i8/oi
GL 218 BO, 2 BW, 194 MCF. Inject 1178 MCF. TP 100#,
CP 640#.
TEMPORARILY DROP UNTIL FURTHER ACTIVITY
13:44 14852325778 CTOC OKC .,~.A*~¢.';~,, PAGI:_
STATE OF ALASKA O0'~
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ~ Suepen¢., Operation shutdown ~ , Re-enter suspended well ~
After ceeitlg __ Repair well~ Piugging Time extension __ Stimulate
Change approved program __ Pull tubing Variance __ Perforate Other-., X
2. Name of
3. Address
2350 PARK AVE, SUITE 2350
OKLA. CITY, OK, 73102
4. Location of well at surface
5, Type of Well:
Development .. ~(
EXploratory --
Stratlgraphfc., .
Service ~
,4./-/
"A",Leg 1,Cond. 6, 1622' N & 437'W of SE crn. Sec. ll,T8N,R13W,S.M.
At top of productive inte~al
~10,150'HD 2,293' $ & 3087' W of SE crn. Sec. 11,TaN,R13W,S.M.
At effective depth
At total depth
@12880' MD, 4121' S & 3703' W of SE crn. of Sec. 11,TaN,R13W,S.M,
12. Present well condition summary d
Total depth: measured 12,880' feet Plugs (measured)
true vertical 9,901' ~"Jfeet
Effective depth: measured 12,880' feet Junk (measured)
true radical 9,901' feet
6. Datum elevation (DF or KB)
11.6:. KB
7. Unit or Property name
Middle Ground Shoal
8. Well number
A22-14LS
9, Permit number /
194-071
10. APl number
5o- 733-10085-62
11. Field/Pool
MGS/"G" Pool
feet
Casing Length Size Cemented
Structural
Conductor
Surface 1997' 13-3/8" 1100 sx
Intermediate 7737' 9-5/8" 700 sx
Production 4108' 7" 1500 sx
Liner 2730' 4-112" SLO1-FED LINER
Pedoratlon depth: measured
9,260' - 11,126'
true vertical
Measured depth
0-1997'
7737'
7424-11532'
10150'-12880'
True vertical depth
RECEIVE
MAR 2 9 2001
Tubing (size, grade, and measured depth}
3-:I./2",9,3~,J55/NS0/L-80 RUE [~ 9.150'
Packers and 8SSV(tyP~e and measured depth)
__ BAKER "FH" PER la 9078'. BAKER FV6 SSSV 0 282'
Alaska Oit & Gas Cons. Oommi
Anchorage
13. Attachments Description summary of proposal
Detailed operations program X BOP sketch
14. Estimated date for commencing operation 15. Statue of well classification as;
04/02/2001
1 ~5, If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
t7' I h~cczt~ t~true and c°rrect t° the best of mY kn°wledge' BRENT ROBERSON
Signed ~::¢~'''"-" Title SR, ENGINEERING TECH
SUapended __
Oats 03/28/2001
FOR COMMISSION USE ONLY
Cendition~ 01' approval: Notify Commissio~n;o representative maywitness 'm.~)O0 9~I ~(~ ~l~.~a¢lr I^pprova, No. ~=~/ - ~) 7 ?
Plug Integrity BOP Test ~ Location clearance __
Mechanioal Integrity Test _, Subsequent farm required 10- 't,,~,~ ,~,~ ,
Approved by order of the Commission
Commissloher
[)
Form lO-403 RevOG/15/88
CONTACT CHARLES POPE@' '('405)' '319"32I 1
ORIGINAL
83/29/2881
13:44
14852325778 CTOC OKC
·
CROSS TIMBERS OPERATING COMPANY
MGS A22-14LS
COOK INLET, ALASIC4
WELL DATA
SURFACE CASING:
PRODUCTION CASING:
LINER:
LINER:
TUBING:
PERFORATIONS:
OBJECTIVE:
13 3/8" 61# K55. Set ~ 1997'. Crat w/1100 sx.
9 5/8 .... 43.5 & 47## NS0. Set at 7737'. Cmt wi 700
7"26#N80. TOL~0'. Set~ 11532'. Cmtw/1500sx. TOC7424'.
4 1/2" 11.6# NS0 BTC. TOL ~ 10150'. Set ~ 12880'. Slotted,
3 1/2" 9.3//I55/N80/LS0 8R EUE ~ 9150;.
GN 9260-9310'
OR 9829-9866'
HC 10224-10389'
HE 10492-10532'
HI 10628-10670' ' '
IffK 10692-107337, 10734-10754', 10750-10890'
HN 10910-10946', 10952-10984~ 11004-I 1026', 11040-I 1126'
Cleanout paraffin w/CTU and Xylene
RU CTU. NU BOPs and test to 3000 psi. Conhnue GL well while RIH w/jet tool on 1 ¼" CT while circ w/
diesel, Continue in hole to top of slotted liner at 10150~, Jet slots w/3000 gal ofxyleae. Displace CTU w/
diesel. POOH. KD CTU. Allow Xylene to soak for 6 hrs.
2. Put well in test and test for 3 days. Take hourly readings ofoil, wtr, gas, injection gas, TP and CP-
ORIGINAL
03./29/2001 13:44 141352325778 CTOC OKC
Cross Timbers )erating Company
Present Completion
MGS A22-14 LS
Cook Inlet, Alaska
Leg 1, Conductor 6
APl No.:733.10085-62
Spud: 6/8/94 (A22.14 Spud 613185,
P&A'd A32.14)
24" Conductor Csg @ 370'
Surf Csg: 13 3/8", 61 lb, !(55. Set
@ 1997'. Cmt'd w/1
Prod Csg: 9 5/8", 43.5 & 47 ib, N80 LTC.
Set @ 7737'. Cmt'd w/ 700 sx.
(47# @ 0-119'; 43.5# @ 119'-3713'; 47#
@ 3713'-7737')
cdp 3/20101
KB: '
Water Depth:
6/25/94 Tbg.' 3 1/2", 9,3#, J55/NS0/L80
EUE 8rd, (top to bottom 31 Jt.~ LB0, 15
Jts NS0, 242 Jts J85, 2 Jts LB0, 2 Jts
Baker "FV-6" TRSCSSV w/"X" Profile @ 28~'
GLM MD 'TVD PORT Ptro Psc
1 2032' 1883' 12 985 906 950
2 3487' 30Z4' 12 960 885 923
3 4879' 4121' 12 925 865 899
4 6144' 5126' 16 975 840 886
5 7168' 5983' 16 955 820 843
6 7830' 6483' 16 935 800 821
7 8429' 6984' 20 1015 775 806
8 8994' 7509' 5/16" Orifice
1 Jt LB0 tbg
Otis "X" Nipple @ 9039' (2.750" ID)
1 Jt LBO tbg
Baker "FH" packer @ 9078' w/40K# shear
1 Jt J,~8 tbg
Ods °XN" Nipple @ 9117' (2.635" ID)
1 Jt J58 tbg
Muleshoe Wlreline Re-entry Guide @ 9150'
Liner Csg: 7", 26 lb, N80, Set @ 7424-
11532'. Cmt w/1500 sx. TOC @ 742.4'
Liner; 4.5", 11.6#, N80 BTC
Slotted Liner @ 10150'-12880'
Bkr HMC hn§r
TD: 12880'
I
I
I
I
I
I
I
I
I
I
PBTD: 11444' (sand)
TD: 11532'
NAR 2 9 2001
10/22/94
GN: 9260-9310'
GR: 9829-66'
Baker Model "D" Pkr w.f Flew-thru Whipstock
(Window from 10241'-10259')
HC-HD: 10224'-10380'
HE-HF: 10492'~10532'
HI-HK: 10628'-10670'
HK-HN: 10692'-10890'
HN-HR: 10910'-10946'
HN-HR: 10952'-t0984'
HN-HR: 11004'-11026'
HN-HR: 11040'-11126'
HR-HZ: 11150'-11186'
HR-HZ: 11198'-112~;4'
Note: Window milled in csg between 10997'-11002'
ORIGINAL
THE MATERIAL UNDER THIS COVER HAS BEEN
MI'CROFILMED
ON OR BEFORE
JANUARY 03, 2001
M ATE IA L UNDER
TH IS M ARK ER
C:LOR_RMFILM.DOC
TONY KNOWLE$, GOVERNOR
ALAS~ OIL AND GAS
CONSERVATION COM~SSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
August 4, 1999
William Miller
Cross Timbers Operating Company
HC01 Box 485
Old Wik Road
Kenai, AK 99611-9704
Dear Mr. Miller,
Admimstrative Abandonment Action Middle Ground Shoal Wells
A33-11 Permit # 85-235 A22-14 Permit # 85-068 Al4-01 Permit # 67-079
Al2-01 Permit # 77-055 A31-11 Permit # 77-031
Al3-01 Permit # 66-015 A41-11 Permit # 85-174
This letter reflects the lateral well that replaced the original well by well number, permit number and APl number:
A12-01LN (permit # 94-120, API# 50-733-10081-62) permit was approved 9/29/94.
A13-01LN (permit # 94-105, API# 50-733-10079-61) permit was approved 8/05/94.
A14-O1LN (permit g 97.:_LI~ API# 50-733-20067-61) permit was approved 9/27/94.
A22-14LS (permit ~API # 50-733-10085-62) permit was approved 5/13/94.
A31-14LW (permit # 94-044, API# 50-733-20305-62) permit was approved 3/23/93.
A33-11LS (permit # 93-180, API# 50-733-20383-61) permit was approved 11/30/93.
A41-11LN (permit # 94-087, API# 50-733-20378-61) permit was approved 6/28/94.
The replacemem well incorporates a lateral with the existing well bore. The lateral along with the original hole will be
used for production of hydrocarbons. A review of both well files indicates administrative abandonment (SQZED, AOGCC
status) of the originating well bore is appropriate according to current AOGCC procedures for wells where additional
permitted laterals are drilled from an existing well bore. Production will be reported to the original API wellbore (-00. -01
or etc) and not to the lateral API wellbore (-60, -61 or etc).
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the
original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC databases require each conductor
have only one permit number and API number. Administrative abandonment of the original permit only eliminates
duplication in the databases. Information for the original well and its replacement will be maintained in their respective
files until plugged and abandoned according to 20 AAC 25.105.
Please notify other cognizant personnel in your organization so that the well will be correctly identified on subsequent
reports and applications submitted to the Commission.
Chairman
F' E R k'i I T
GeoJ og'i'ca'i J'4al::er"i:a'i s Ir"~ven'!::or'y
DATA 'T DAT.&_~P L U :S
9 4 '.-,- 0 7 I ~/'616 9
9~+,-'-' 0 7 1 ~?
10275'~"12673 DITE/LDT/CNGR
COI','IP DATE: 08/"02/'9/~.
05/27 .'~08/01/94
10365'~. 12880 kid
R 0~Y12880
L 10256'-.-'i2636 1
L 10200',~12880 " I
07/06/94
09/02/9/,
09/02/94
07/06/9a
09/02/94
07/06/9/~.
08/"03/9~
0 '7 / 06 / 9 a
Ape dr'y di'tch samples r'equ~'r'ed? yes ~'e~'ved?
Was t:he we1 'i eot'ed? yes ¢]~.~ys~'s ~: descr"i'pt~'or~ r'ece'i"~r".::,
Ar"e we'i'l tests r'equi'r'ed? yes~~-R~roeq'-ved";*
. yes no
ble'l'i ~'s ~'n comp'l
I n '¥ t '"i a 'i
C Oi,tkl E N 'T S
January 30,1995
Shell Western E&P Inc.
An affiliate of Shell Oil Company
P. O. Box 576
Houston, TX 77001
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Gentlemen:
SUBJECT: SUBMITTAL OF REPORT OF SUNDRY WELL OPERATIONS (FORM 10-404) for MIDDLE GROUND SHOAL A22-14LS
Enclosed in duplicate is the Report of Sundry Well Operations for MGS A22-14LS.
Perforation operations were completed October 22, 1994.
If you have any questions or wish to discuss, please call Marcus Winder at (713) 544-
3797 or Alan Foglesong at (907) 283-2509.
Sincerely,
~,~G. S. Nady
Manager - Asset Administration
Western Asset
Enclosures
MGS404.DOC- 1
RECEIVED
FEB ~-6 1995
Ai~ska Oil & Gas Cons. C0mmissio~
Anchora,;~
ORIGINAL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate
Pull tubing ~ After casing
Plugging Perforate X
Repair well ~ Other __
2. Name of Operator
Shell Western E&P linc.
3. Address
P.O. Box 576, Houston, TX
4. Location of well at surface
77001-0576
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
PLATF A, LEG 1, COND 6, 1622'N & 437'W OF SE COR SEC. 11
At top of productive interval 'cSN
e 10150'MD, 2293'S & 3087'W OF SE COR SEC. 11, TSN-R13W,s.~,
At effective depth
At total depth
~ 12880'MD, 4121'S & 3703'W OF SE COR SEC. 11, T8N-R13W~A~'
6. Datum elevation (DF or KB)
] ]6' DF feet
7. Unit or Property name
NIDDLE GROUND SHOAL
8. Well number
A22-14LS
10. APl
50- 733-10085z52
11. Field/Pool
NIDDLE GROUND SHOAL
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
12880 feet Plugs (measured)
9901 feet
12880 feet Junk(measured)
9901 feet
Casing Length
Structural
Conductor 324'
Surface 1997'
Intermediate 7737 '
Production 4108 '
Liner 2730'
Perforation depth: measured
9260' - 9866'
true vertical
7652' - 8249'
Size Cemented
24mm
13-3/8"
9-5/8"
7"
4-1/2"
(2 INTERVALS)
1100 SX
700 SX
1500 SX
SLOTTED
II G II
mm G I,
II G II
LNR
Measured depth
True vertical depth
324'
1997'
7737'
7424'-11532'
10150'-12880'
RECEIVED
Tubing (size, grade, and measured depth)
3-1/2" 9.3# ,].--55/N-80/L-80 EUE 8rd from 0' to 9150'
Packers and SSSV (type and measured depth)
BAKER "FH" PKR 0 9078'; BAKER "FV-6" TRSCSSV W/"X"
FEB -' 6 1995
¢,i~ska 0ii & Gas Cons. Commission
Anchora p
PROFILE @ 282'
13. Stimulation or cement squeeze summary
Intervals treated (measured) N/A
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
372 82 2 910
348 189 4 690
Tubing pressure
100
90
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ ~,LC.~'~ '~
Form 10-404 Rev 06/15/88
$. NADY Title MGR. - ASSET ADMIN.
Date 1/30/95
- 44 -
ORIGINAL
SUBMIT IN DUPLICATE
~ ~ILY ~EP~T
PLATF~H:~ A ~Lt; A2Z-16k~ 22-~%-9~ ~OR~MAN:
,
~F~: ~9~ ~ ~ ENGINEER: A.A. F~LESONG
AUTO: ~,~ ! S~1,91~.00 C~LATIVE: ~$,~.00 *
DAr YTO:.L.. 9 TR[ YTD:. J.. ~ DAYS & DAYS ESTA~TEO: OF
~E~s:~ NO ACCIDENTS REP ~TED FLUID TYP~: OIL ~IGNT:
SPILLS: ~O SP~LL$ RE~TEd RT TO TSG H~GER: ZS.~' TOF: *
~ ~ - 98~ - ~838~. (9') & 9~4~ - 9110'
~ R~ ~NLUMBER(ER - PREPAR~ TO MOVE ~IG TO A12-OILN
, ~1 ADOIT[ONA C;C)~IENTS; DRILL~, V[SZTORS, INSPECT~S ETC...
/
,i
I.
* + S~P! r~RVIS~ & LA6~: S~O.O0
* ~TR~T SERVI~ES~ MAT;RIALS:
* B..CATERING~,
* C.~FISHIING ~ ~,00
* E..STI~JLAT[ON, OTHER ~P S0.00
* F..PR~JCT]~ E~IP SERVIC S0.00
* G..PERF aATIgG
* ~..PAC~R, PLUG SETTI~ SO.00
* [..L~G~NGt OTHER ELECTRIC ~.00
' J..~]~LINE~ BRAIDED LA? $0.00
* K..~LLHE~O SErViCE ~.00
"SUI4KARY OF DAILY COST" *
*
A,.$~EPI PURCHASEO RIG ~UP
$..WORKOVER FLUIDS & AOOIT
C..PACKERS
D..BRIDCE PLUGS, RETAINERS
/..TUBING, PUPS, COUPLINGS
F..Cd~S LEFT MANDRELS & VAL
G..X- & XN NIPPLES
N..UELLNEAO EQUIPMENT
I..BOP~ KOOMY~ CHOKE PARTS
L..OTHER HATERIALS PLUS FU
TOTAL MATERgAL$
$0.00"
$0. O0 *
$0. O0 *
$0. O0 *
$0. O0 *
S0.00 "'
$0. O0 *
~,0 o O0"
%0. O0 *
~&38.00 w
S~3~. O0 *
$0.00 *'
'~.00 *
$0.00 *
SO.O0 *
* SO.OD
·
* TOOLS, SLIPS, ELEV RENTAL
* TRA~Ia()~TATIC)fl: ALL OTHER $O.0O OTHER RENTALS
RECEIVED
~:~.~.s~c-~ ()ii. & Gas Cons. Commissio~
Anchor~ ~
* DAILY REPOI~T
~ PLATFOR#: A WELL: A22-1&LS 21-0ct-94 FOREMA#: R.H. SgLTZ
· AUI~: ~.000 SO.O0 C~LAIIVE: $~3,49~.00
* Oll YTD: .... 1 T~I YTO: .... 1 DAYS & DAYS ESTIMATED: OF
* C~ENTS: NO ACCIDENTS REPORTED FLUID TYPE: OIL ~GHT:
* SPILLS: NO SPILLS R~P~TED RI TO TSG HA~GER: 38.90' TOF:
~ TINE l~O ~MARY OF ~ERATI~S: *
* 6.00 HAS - R/U SL~CKLINE UBIT g LUBRI~T~ - TEST LUSRICRI~ TO 1500 ~I
~ RIM - ~LL VAL~ e7 - FLUSH ~/~0 - SET S/lA~* ~IFICE - R/O SLIC~LI~E U~I
* RtU SC~L~e~e - lEST LUBRICRIffi 10 2000 PSi - al~ U/G~ RAY/COLLAR
~ TIE I~ USING DRESSER ATLAS B~D L~ DATED 8-~-g5. P~H - Riff ~/PERF.
t
t t
~ ADDITI~AL ~E~TS; DRILLS, VISII~S, INSPECTORS ETC...
Sb'EP! SLIp~RVISIOH & LABOI~: $0.00
CO~TRACT SERVICES:
A..C~4TRACT CR~ $ ~S&D $O.00
C..FISNENG $0.00
D..CEMENTING ~.00
E..STI~LA1I~, OTHER ~ $0.00
F..PR~UCTI~ E~tP SERViC $0.00
G..PERFORAT~HG $0.00
H..PACKER, PLUG SETTING $0.00
I..LOGGING~ OT~ER ELECTRIC ~.OO
J..SLICKLINE, 8RAIDEO L~E $0.00
K..~LLNE~ SERVICE
L..OTNER ~RVICE (~ ENGI
TOTAL ~TRACT SERVICES $0.00
TRANS~TAT~OM: FIXED COS[ $0.00
TRA~SP~TATI~: ALL O~R
TOTAL TRAMSPOR/ATIO~ COST $0.00
'*SLMMA~Y OF OAILY COST"
HATERIALS:
A..SgEP! ~JRCgASED RIG SUP
B..IdOR/OVER FLUIDS & ADOIT
C..PACKER$
D..$alOGE PLUGS, RETAINERS
E..TUSING, PUPS, COUPLINGS
F..GAS LIFT HA#BRELS & VAL
G..X- & X# NIPPLES
H..Id~LLHEAD E~UIPMENT
I..BOP, ~00N¥o CHOKE PARTS
L..OTNER MATERIALS PLUS FU
TOTAL MATERIALS
gO~K STRING RE~TAL
TOOLS, SLIPS, ELEV R~#TAL
SPECIAL TOOLS ETC REWTAL
TOTAL RENTALS
SO.00
I;0.00
$0.00
$0.00
~O.00
$0.00
$0.00
S0.00
$0.00
$0. O0
$0.00
SO.O0
SO.Q0
S0.00
F~: \123\A/.1 - 11 \NRPT
RECEIVIED
Gas,ConsI Commissio~
Anchor~' '1
I..O..-'IO'd I¥N3,",t Ol U tuJoj-l.e[d [Iaq5 NOel...4 L.JUr..GP:2.,O t::'66I-':E-OI
., i I DAILT REPORT
* PLATFORM: A WELL: A2~-I&~S 19-Oct-g& FOREMAN: SELTZ R.H. *
* AFE! 755;97 I ENGINEER: A. A. FOGLESONG
,* CO~I4E~TS KO ~CC[DENTS REIO~TED FLUID TYPE: O~L ~IGHT; *
NO S~[LLS REPUTED RT TO T8G HA~C/R: TOF:
~RY OF OPE~TI~S:
SET ~LI~LZNE UNiT - ~/U LUBRICATOR & TEST T0 1500 P~l - RIM U/2.20"
t
m
M~ELLS ~1 - (~ - R/O LUBRICAIOR & STICKLIKE UNIT
[N
[FI V&LVES t7 g ~WERE WASHEO ~l.
T IRE ~
* ~.00 ~
*NOTE; GAS L
* ~DIT~ON
,
I I
COMTRRCT/$ERV~CES:
ENTING
~tLAT~ON~ OTHER PL
)UCIlON E~UIP SER~
FO~AT!NG
~ER, pLUG SETTING
I OTHER ELECTF[C
~ING,i
:KLINE, BRAIDED t !NE
LHEAD' SEeVZCE
ER SERVICE (1~
~TRAC~ SERVICES
~TAT~: ALL OTHER
~S~TAT]~
"SUI~ARY O~ DAILY COST" *
$2,113.00
MATERIALS:
SO.gO A..SW(EPI PURCHASEO RIG SUP $0.00
$950.00 8..t~KOVER FLUIDS &ADDIT S0.00
$0.00 C..PACKER$ $0.00
$0.00 D..BRIDGE PLUGS, RETAINERS $0.00
$0.00 E..TUBING, PUPS, COUPLINGS SO.00
$0.00 F..GAS LIFT MANDRELS & VAL $0.00
$0.00 G..X- & XN NIPPLES S0.00
$0.00 N..I,~LLREAO E~JIPMENT $0.00
$0,00 T..~OP, KOOHY, CHOKE PARTS $0.00
S0.00 L..OTHER MATERIALS PLUS FU S1,260.00
$0.00 TOTAL MATERIALS S1,260.00
$0.00
S7,39Z.00 ~ORK STRING RENTAL $0.00
TOOLS, SLIPS, ELEV RENTAL $0.00
S0.00 SPECIAL TOOLS ETC RENTAL $0.00
S0.00 OTHER RENTALS $0.00
S0.00 TOTAL RENTALS ~0.00
TOTRL P. 01
Shell Westem E&P Inc.
130 Trading Bay, Suite 310
Kenai, Alaska 99611
(907) 283-3096
r · ["It'
October 13, 1994
Alaska Oil and Gas Conservation Commission
3001 Porcupiae Drive
Anchorage, AK 99501
SUBJECT: SUBMISSION OF FORM 10403 APPLICATION FOR SUNDRY APPROVAL
TO PERFORA~ MIDDLE GROUND SHOAL WELL NO. A22-14LS.
Eaclos~ in triplicate is the Application For Sundry. Approval to perforat~ the "E" and "F" Pools
throush tubing in MGS A22-14LS. Operations are expect~ to begin October 20, 1994.
If you lmve any questions or wish to discuss, please call me at (907)283-2509.
Sincerely,
Alan Fogies
Smior Produ~on En~neer
E.ciosums
A2214
OCT ~ ~ 1994
Alaska ~fl & Gas Cons. Commission
,, Ntchora~e
1~;/4'( :~1~1-1~ ! 14,t:.INH 1 HI~
-'-'STATE OF ALASKA
AL ~A OIL AND GAS CONSERVATION COMMI, 3N
APPLICATION FOR SUNDRY APPROVALS
1. Type cf Request: Abandon
Alter easing ---,
Ret~Jr Well
Cl'ange appr~ pre,mm __
Name of Operator Shell Weetem E&P Ire.
Plugging ~ Time extension
3. Address 130 Trading Bay SUite 310
Kanai, AK 996'il
5, Type of'Well:
Exploralgry
Stra~igramie
Platform "A", Leg 1, Conductor 6. 1622'N & 437'W of 8E corner of
Section 11, T8N,1=i13W, S.M.
@ 101ffr0'MD, 2293'$ & 308TW of SE comer of 8eot]on 11, TSN,
R13W, $.M.
4. Location of well at
surface
At top of productive
interval
At effective depth
At total depth
@ 12880'MD, 4121'5 & 3703'W of SE corner of Section 11, TSN,
R13W,
P, for x
6. Datum elevation (l~'j~ or KB~
116' DF r~t
/, Urll! or Property flame
M~d~ G~ 8h~l
'8. weft nu~r ' '~
~-1~
g. Pe~ nu~r
~ ~. ~ooi
12, Present well condition summary
Total depth: measured
true vertical
Effective clepth: measured
true vertical
12880 feet
9901 feet
12880 feet
9901 feet
Plugs (measured)
Junk (measured)
Casing Length
Structural
Conductor
Surface 1997
Intermediate 7737'
Production 4108'
Liner 2730'
Perforation depth:
Size
13-318", 61#, N-~0
g-5/8", 43.5-47#, N-80 Bid LT&C
T', 26~, N-80 LTC
4-1/2", 11.6#, N.Et] Slattll~
Cemented Measureel depth True vertical depth
Tubing (size, grade, and measured depth)
1100 IX "G" 1'997'
700 Ix "G" 173T
1500 eX "G*' 7424' - 11532'
elotted liner 10150' * 128a0'
RECEIVED
OCT 1 4 1994
measured $1otled liner- KOP to TD
true vertical Alaska 0ii & Gas Cons, Commi
Anchorage
3-1t2", 9.ff4t, d-SS/N-a0/I.-~0 EUE 8rd from 0' to a150' (MD)
Packers and SSSV (type, and measured depth) Baker "FH" packer @ 9078'
Baker "I=V'~" TRSC:SSV w/"X" Profile ~ 28,?.'
13. Attachments Desc~ption summary of proposal X__ Detailed operations program BOP sketch
_ ,
14. Estimated date for commencing operation 10/20/94
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas Suspended
17. i hereby cenily that the t~.~oregoi, ng iS true and correct to the best of my knowledge
Signed ~ ~;x~ Title Sr. ProduetlonEngineer
FOR COMMISSION USE ONLY
sion
Conditions of approval: Notify Commission so representative may witness
Plug integrity, BO_P Test Location oleara~x;e
Mec~aniEal InTegrity Teat~ --Subsequent form requi-~d 10-~
Date
Approved by order of the Commission
Original Signeo
David W. Johnston
Commissioner
Form 10-403 Rev 06/15/88
Approved Copy
Returned
SUBMIT IN TRIPLICATE
MIDDLE GROUND SHOAL No. A22-14LS
pERFORATE "E" & "F" POOLS {'GN-GO & GR-GS)
1. Continue to gas lift well to provide underbalanced perforating
conditions.
2. RU Schlumberger Electric Wireline Unit (EWLU) with 2 1/8" Retrievable
Strip Phased Enerjet perforating guns loaded at 6 SPF. Test lubricator
to 3500 psi. Perforate as follows.
RIH and correlate to Schlumberger's LDT/CNL/DITE/CAL/P,R Log dated
06/21/g4 (correlate with the GR portion of this log). Use color
coded markers to flag wireline depths as needed to aid depth
correlation during subsequent perforating operations.
b) Perforate the GR-GS ("F" Pool) from 9829'-g866' through tubing
while gas lifting. {NOTE: Reduce gas injection when guns mre at
or above the SSSV nipple to prevent surging guns into the
lubricator when RIH and POOH.)
c) Perforate the GN-GO ("E" Pool) from 9260'-9310' through tubing
while gas lifting. (NOTE: Reduce gas injection when guns are at
or above the SSSV nipple to prevent surging guns into the
lubricator when RIH and POOH.)
d) RD EWLU. Test well and report.
REE'EIVED
OCT 1 4 1994
Alaska Oil & Gas Cons. Commission
Anchora,,, ~
C: \F I LES\PROI~\A22140AP, PRG
()
/ \
TOL @ XX/ /XX
10150'MD / /PKR
4.5" ~.~#/ /
~-~o B~C / /
SLOTTED / /
LINER / /
////
I fi~I~1~1~1~~
I I
HGS A22- I4LS
CURRENT COMPLETION EQUIPMENT DETAIL - 10/13/94
.... BAKER "FV-6" TRSCSSV w/ "X" Profile @ 282'
24" Conductor Casing g 370'
13-3/8" 61# Surface Casing g 1997'
3-1/2" g.3# J-55/N-80/L-80 EUE 8rd Tubing
{top to bottom 31 its L-80, 15 jt$ N-80, 242
its J-55, 2 its L-80, 2 its J-55)
5
:X
<
TO = 11532'
· -.- GN -GO
: = GR-GS
GLM MD
elm
1 2032' 1883'
2 3487' 3O24'
3 4879' 4121'
4 6144' 5126'
5 7168' 5953'
6 7830' 6483'
7 8429' 6984'
8 8994'
TVD PORT Ptro
Psc Pso GAS
~ mm~m m~----
12 985 906 950
12 960 885 923
12 925 865 899
16 975 840 886
16 955 820 843
16 935 800 821
.,
20 1015 775 806
7509' 5/16" ORIFICE
Top of 7" Production Liner g 7424'
9--5/8" 43.5x47# N-80 LTC Casing @ 7737'
(47# e 0-119', 43.5# e 119-3713'; 47# e 3713-7737')
I jt 3-1/2" 9.3# L-80 EUE 8rd tbg
OTIS "X" Nipple e 9039' (2.750" ID)
1 jt 3-1/2" 9.3# L-80 EUE 8rd tbg
BAKER "FH" Packer @ 9078' w/ 40,000# shear
1 jt 3-1/2" 9.3# J-55 EUE 8rd tbg
OTIS "XN" Nipple e 9117' (2.635" ID)
1 jt 3-1/2" 9.3# J-55 EUE 8rd tbg
Muleshoe Wireline ReEntry Guide @ 0150'
9256' top (to be perforated later)
9840' top (to be perforated later)
= HC-HD 10224' - 10380'
< BAKER Model "D" w/Flow-thru Whipstock (Window from
= HE-HF 10492' - 10532' 10241'-59')
= HI-HK 10628' - 10670'
= HK-HN 10692' - 10890'
= HN-HR 10910' - 946', 952-984', 11004-026', 040-126'
= HR-HZ 11150' - 11186', 11198' - 11254'
NOTE: Window milled in casing between 10997' - 11002'
PBTD = 11444' (sand) ~
7" 26# N-80 Production Liner @ 11532'
12880' = Btm of 4-1/2" Liner
12880' = TD
C: \F ILES\PROG\A2214LS1. WBD
RECEIVED
OCT 1 4 1994
Alaska Oil & Gas Cons. Commission
Anchora.~ ~
()
XX <
/ \
xx/ /xx.=
/ /PER <
MGS A22-14LS
PROPOSED COMPLETION EQUIPMENT DETAIL - 10/13/94
< ....! Fk BAKER "FV-6" TRSCSSV w/ "X" Profile e 282' . 24" Conductor Casing @ 370'
13-3/8" 61~ Surface Casing P 1997'
3-1/2" 9.3# J-55/N-80/L-80 EUE 8rd Tubing
(top to bottom 31 its L-80, ]5 its N-80, 242
........... its J-55, 2 its L-80, 2 its J-55)
5
X
GLM MD TVD PORT Ptro Pst Pso GAS
mmm ----~ ~mm mmmm mmmm
1 2032' 1883' 12 985 906 950
2 3487' 3024' I2 960 885 923
3 4879' 4121' 12 925 865 899
4 6144' 5126' 16 975 840 886
5 7168' 5953' 16 955 820 843
6 7830' 6483' 16 935 800 821
7 8429' 6984' 20 1015 775 806
8 8994' 7509' 5/16" ORIFICE
Top of 7" Production Liner @ 7424'
9-5/8" 43.5x47# N-80 LTC Casing ~ 7737'
(47# @ 0-119', 43.5# @ 119-3713'; 47# @ 37]3-7737')
Ijt 3-1/2" 9.3~ L-80 EUE 8rd tbg
OTIS "X" Nipple @ 9039' (2.750" ID)
1 jt 3-1/2" 9.3# L-80 EUE 8rd tbg
BAKER "FH" Packer @ 9078' w/ 40,000# shear
1 jt 3-1/2" 9.3# J-SS EUE 8rd tbg
OTIS "XN" Nipple @ 9117' (2.635" ID)
1 jt 3-1/2" 9.3# J-55 £UE 8rd tbg
Mu!eshoe Wireline ReEntry Guide @ 9150'
GN-GO 9260' - 9310'
GR-GS 9829' - 9866'
TOLe
10150'MD
4.5" 11.6#/ / =
N-80 BTC / / =
SLOTTED / / :=
LINER / / :=
I iI
Ililltl!!ll//ll .......
/ / TO = 11532'
12880' = Btm of 4-1/2" Liner
12880' = TD
C:\F I LES\PROG\AZZl4LSZ.WBD
HC-HD 10224' - 10380'
BAKER Model "D" w/Flow-thru Whipstock (Window from
HE-HF 10492' - 10532' 10241'-59')
HI-HK 10628' - 10670'
HK-HN 10692' - 10890'
HN-HR 10910~ - 946', 952-984', 11004-026', 040-126'
HR-HZ 11150' - 11186', ]]]98' - 11254'
NOTE: Window milled in casing between 10997' - 11002'
PBTD = 11444' (sand)
7" 26# N-80 Production Liner @ 11532'
REEEIVED
OCT 1 4 1994
Alaska Oil & Gas Cons. Commission
Anchora.9
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: RIGGING UP
PROG. DEPTH 11076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 4
NLTA LTH/YTD / 1 EST. DAY 43
LTA LTH/YTD ___/___ DAYS +/-
DAYS SINCE LAST LTA 420
LAST BOP TEST LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @
PP2 @ KILL SPEED @
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 SET BEAVER SLIDE & CAT WALK - SET 10" FLOW LINE MANIFOLD IN PLACE -
TERMINATE ELECTRIC CABLES TO "J" BOX IN PUMP ROOM - REMOVE DRILLING
LINE SPOOL ~[[_[!~_[[~[_£_~[[6E_[[~[_~[_~L~_~E~_~_~ANIFOLD
PARTS - R/U 2" STEEL LINES TO A22-14LS (TBG & ANNULUS) & BLEED GAS OFF
WELL - R/U 2" STEEL LINES OFF INJECTION WELL TO A22-14LS TBG & LOAD
WELL W/FIW (PUMPED E~_~L_E!~_Ig_~EI_EEIUE~ PUMPED TOTAL OF 736 BBL
FIW - CAPACITY OF WELL AROUND PACKER IS 637 BBL) SHUT DOWN FIW & LET
WELL (TBG & ANNULUS) VENT TO ONDECK TANK - WORK ON 10I' FLOW LINE -
HANG 6" CHOKE LINE MANIFOLD - TERMINATE AC POWER CABLES FOR RIG -
ROUTE CABLES FOR #7 CAT - INSTALL WINDWALL BETWEEN PUMP ROOM & CAMP -
RE-POSITION NORTH SIDE PIPE RACK STAIRS - OFF LOAD BOAT (TUBULARS &
MISC EQUIP) - WORK ON RIG FLOOR DRAINS & DRIP PAN - CLEAN DECK OVER
WHR #4 - SMOKE TEST DRAWWORKS~ TOP DRIVE~ ROTARY, & MUD PUMPS -
TIME (HRS)
CUM. ROT. HRS
ROTAT I NG
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NiP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT I NG
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
24.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL. A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: RIGGING UP
PROG. DEPTH 11076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE 05/28/94
DIST. KB TO BHF 41.0. DAY 5
NLTA LTH/YTD ___/__~ EST. DAY 43
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 421
LAST BOP TEST LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @
PP2 @ KILL SPEED @
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 PLUMB STEAM & WATER LINES TO RIG - HOOK UP PRODUCTION SAFETY AIR -
INSTALL DERRICK ESCAPE LADDER ON EAST SIDE OF DOG HOUSE - WORK ON AIR
LEAK AT SWACO CHOKE - WORK ON 6" CHOKE & WATER RETURN LINES - PLUMB
DEGASSER VENT LINE - HOOK UP MUD LINE TO PUMPS - UN-BUNDLE & LAY OUT
3 lj2" DRILL PiPE - PREPARE DERRICK/RIG FLOOR FOR DERRICK LEVELING -
LEVEL DERRICK - RE-CONNECT STD PIP~z STEAM HEATERS~_~ DEGASSER VENT
LINE - WORK ON IRON ROUGHNECK - HANG BRACKETS ALONG PUMP ROOM & PITS
FOR LINES - INSPECT & SERVICE FLUID ENDS OF MUD PUMPS - WORK ON GAS
ALARMS - MONITOR WELL ANNULUS PRESSURE (ITS ON A VACCUM).
NOTIFIED AOGCC (BLAIR WONZELL) 0800 ~ 5-27-94 OF UPCOMING BOP TEST
STATE DECLINED WITNESS
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
COR I N G
24.00
RIG NAME PLATFORM
FIELD
LEASE PLATFORM
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SEITZ R H
PRESENT ACTIVITY: RIGGING UP
MIDDLE GROUND SHOAL
SWEPI ALASKA DAILY DRILLING REPORT
PROG. DEPTH 11076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 SET BEAVER SLIDE & CAT WALK - SET 10" FLOW LINE MANIFOLD IN PLACE -
PAGE 1 OF 1
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 4
NLTA LTH/YTD / 1 EST. DAY _~
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 420
LAST BOP TEST LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @
PP2 @ KILL SPEED @
TERMINATE ELECTRIC CABLES TO "J" BOX IN PUMP ROOM - REMOVE DRILLING
LINE SPOOL OFF RIG FLOOR - CLEAR FLOOR OF SLINGS~_~~_& MANIFOLD
PARTS - ~ 2" STEEL LINES TO A22-14LS (TBG & ANNULUS) & BLEED GAs OFF
WELL - ~[U 2" STEEL LINES OFF INJECTION WELL TO A22-14LS TBG & LOAD
WELL W/FIW (PUMPED 450 BBL FIW TO GET RETURN~ PUMPED TOTAL OF 736 BBL
Fig - CAPACITY OF WELL AROUND PACKER IS 637 BBL) SHUT DOWN FIW & LET
WELL (TBG & ANNULUS) VENT TO ONDECK TANK - WORK ON 10" FLOW LINE -
HANG 6" CHOKE LINE MANIFOLD - TERMINATE AC POWER CABLES FOR RIG -
ROUTE CABLES FOR #7 CAT - INSTALL WINDWALL BETWEEN PUMP ROOM & CAMP -
RE-POSITION NORTH SIDE PIPE RACK STAIRS - OFF LOAD BOAT (TUBULARS &
MISC EQUIP) - WORK ON RIG FLOOR DRAINS & DRIP PAN - CLEAN DECK OVER
WHR #4 - SMOKE TEST DRAWWORKS, TOP DRI~ ROTARY~_~ MUD PUMPS -
TIM~_~RS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
24.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: RIGGING UP
PROG. DEPTH 11076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE 05/28/94
DIST. KB TO BHF 41.0. DAY 5
NLTA LTH/YTD ___/__~ EST. DAY 43
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 421
LAST BOP TEST LAST CSG TEST ~31/~
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @
___
PP2 @ KILL SPEED @
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 PLUMB STEAM & WATER LINES TO RIG - HOOK UP PRODUCTION SAFETY AIR -
INSTALL DERRICK ESCAPE LADDER ON EAST SIDE OF DOG HOUSE - WORK ON AIR
LEAK AT SWACO CHOKE - WORK ON 6" CHOKE & WATER RETURN LINES - PLUMB
DEGASSER VENT LINE - HOOK UP MUD LINE TO PUMPS - UN-BUNDLE & LAY OUT
~_~2" DRILL PIPE - PREPARE DERRICK/RIG FLOOR FOR DERRICK LEVELING -
LEVEL DERRICK - RE-CONNECT STD PIPE~ STEAM HEATERS~ & DEGASSER VENT
lINE - WORK ON IRON ROUGHNECK - HANG BRACKETS ALONG PUMP ROOM & PITS
FOR LINES - INSPECT & SERVICE FLUID ENDS OF MUD PUMPS - WORK ON GAS
ALARMS - MONITOR WELL ANNULUS PRESSURE (ITS ON A VACCUM).
NOTIFIED AOGCC (BLAIR WONZELL) 0800 H~ 5-27-94 OF UPCOMING BOP TEST
STATE DECLINED WITNESS
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAM I NG
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
(]OR I NG
24.00
PI ALASKA DAILY DRILLING REPORT
-~.~,
PAGE 10~ 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRIllING FOREMAN: SELTZ R H
PROG. DEPTH 11076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: ~ZU 5" DRILL PIPE
ELEVAT. KB TO MSL 116.0 DATE 05/31/~
DIST. KB TO BHF 41.0 DAY 8
NLTA LTH/YTD / 1 EST. DAY 43
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST 1TA 424
LAST BOP TEST 05/29/94 LAST CSG TEST 07/31/85
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @
PP2 @ KILL SPEED @
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 CUT 2 7/8" TBG IN THE MIDDLE OF JT ABOVE GUIBERSON PACKER (9500~)
8.50 POOH LAYING DOWN 2 7L8" TBG & TOOLS
2.50 ~/U TEST PLUG & SET - CHANGE 2 7/8" RAMS TO VARIABLE - M/U 5" TEST JT
1.5o likk_~I6£E_:_IEAI_~!~E_R6U~ BLIND RA~_~9~R VALVEL & DART VALVE TO
~L~O00 PSI
.50 ULU_~_~ZE'Z_g~EE~!~_~B~_& (6) 4 3/4" DC'S
1.50 RIH W/22 STNDS 3 1/2" DP - sZEBR~_RE!L!~_~_RZU_~!Ag' 3 l/Z,, DP
1.00 CHANGE TOP DRIVE SAVER SUB TO 4
3.00 CONTINUE TO P/U 3 1/2" DP
NOTEz_~_~2" DRILL PIPE & TOOL RENTAL PACKAGE STARTS 5-30-94
NOTEI THERE IS AN ALIGNED INTEREST JOINT MEETING FOR MANAGEMENTz TECH-
N]CALL & IMPLMENTATtON TEAMS SCHEDULE FOR WED 6-1-94 ON PLATFORM
A ~ONTACT LEE DEWEES @ M-I DRILLING IF YOU H~g~ NOT RECEIVED
AN AGENDA. PLEASE CONTACT RICK SELTZ ON PLATFORM A (ASAP) IF
__
:': . ~b~,~' --
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 1 .50
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING 2.00
NIP UP/DOWN /BOP/WH
TESTING BOP /WH 1.50
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS 15.50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 3.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 13076
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: TRIPPING OUT OF HOLE
ELEVAT. KB TO MSL 116.0 DATE 06/01/94
DIST. KB TO BHF 41.0 DAY 9
NLTA lTH/YTD / 1 EST. DAY 43
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA 425
LAST BOP TEST 05/29/94 LAST CSG TEST 07/31/85
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 180 @ 30
PP2 @ KILL SPEED 260 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
5.50 P/U 5" DRILL PIPE (HELD PRE-JOB SAFETY MEETING) - TAG OBSTRUCTION
2.00 M/U TIP DRIVE & WORK OVER FISH (THOUGHT WE TAGGED UP @ 9392'- AFTER
CHECKING PIPE TALLEY FOUND WE TAGGED @ 9488')
3.50 POOH - NO FISH
.50 LZD_~_~E_OVERSHOT (APPPEARED FISH HAD BEEN IN GRAPPLE)
.50 INSTALL WEAR BUSHING
1.50 SERVICE RIG WHILE WAITING ON XO'S TO RUN STRING MILL & OVERSHOT
.50 M/U BHA
3.00 TIH - RUN SLOW IN 7" LINER - TAGGED TIGHT SPOT @ 8986'
4.50 M/U TOP DRIVE - CLEAN UP TIGHT SPOTS IN 7" CASING @
9315' TAG FISH @ 9497' - WORKOVER FISH - JAR UP ON FISH & BREAK
LOOSE DOWN - WORK FISH UP THROUGH TIGHT SPOT
2.50 POOH
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 9.00
C & C
REAMING 4 .50
SURVEYS
JET
REPAIRS
FISHING 2.00
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT I NG
PICKUP/LAY DOWN DS 6.50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
E VAL UA T I ON
CORING
SWEPI ALASKA DAILY DRILLING REPORT
PAGE I OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 13076
PRESENT DEPTH 10300
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: SLIPPING DRILLING LINE
ELEVAT. KB TO MSL 116.0 DATE ~Z~Z~
DIST. KB TO BHF 41.0 DAY 10
NLTA LTH/YTD / 1 EST. DAY 51
___
LTA LTH/YTD / DAYS +/- +0.0
DAYS SINCE LAST LTA 426
LAST BOP TEST 05/29/94 LAST CSG TEST ~Z/31/85
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @ 30
PP2 @ KIlL SPEED @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 TOOH W/FISH
2.50 L/D FISH (15' 2 7/8" TBGL GUIBERSON PACKERL (1)'JT
(1) JT ~.& SHEAR OUT SUB) & FISHING TOOLS
4.00 ~ZU_RR BI!_~_~_~_!ZS" STRING MILL - TIH - TAG BAD SPOT @ 9499'
1.O0 M/U TOP DRIVE & REAM 9499' TO 9509'
1.00 P~U SINGLES - REAM TIGHT SPOTS @ 9677' - 9683' - 9790'
1.50 PULL (6) STDS &.~![6~_~E![!~_~_~ZU, (18) JTS 5" DP
2.50 M/U TOP DRIVE - CLEAN OUT TIGHT SPOT @ 9790' TO 9803~ - 9894~ - 9914'
TO 9920' - 9937'_:_!~2' - RIH T0_1~.300'
5.00 POOH - L/D STRING MILL
4.50 M/U 7" SCRAPER - TIH - M/U 9 5/8" SRAPER - TIH - TAG TOP OF LINER~ BIT
DEPTH 10~288'
NOTEi I WOULD LIKE TO THANK ALL THE ALIGNED INTEREST TEAM MEMBERS
FOR TAKING TIME OUT OF THEIR WORK DAY TO ATTEND THE JOINT AIT
MEETING & RIG TOUR (RV WELLS FOR COMING OUT ON HIS DAYS OFF)
GOOD MEETING GUYS!
THANKS SHEP (ONSHORE TERMINAL OPERATOR) FOR FINDING SURPLUS
VALVES IN THE WHAREHOUSE FOR OUR SLOP TANK PROJECT (INSTEAD
OF BUYING NEW)
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 15.50
C & C
REAMING 3.50
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/gH
TESTING BOP /WH
RUNNING CASING
CEMENT I NG
PICKUP/LAY DOWN DS 5.00
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
COR I NG
OTHERS
SUEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
~ELL A22-14LS
~ORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: TOOH
ELEVAT. KB TO MSL 116.0 DATE 06/03/~
DIST. KB TO BHF 41.0 DAY 11
NLTA LTH/YTD / 1 EST. DAY 51
_I_
LTA LTH/YTD ___/___ DAYS +/- +0.0
DAYS SINCE LAST LTA 427
LAST BOP TEST ~~ LAST CSG TEST ~~
PROG. DEPTH 13076
PRESENT DEPTH 10300
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.00 CUT & SLIP DRLG LINE
50 SERVICE RIG
O0 TIH TO 8715'
50 ~IE6~_DE!L!~_~_~u REMAINDER OF 5" DP
O0 ~I~_~U~_~_~i~_U.IGH VISC SUEEP (DID NOT GET ANYTHING OUT)
50 TOOH W/SCRAPERS
50 L/D SCRAPERS - STD BACK COLLARS
O0 M/U RTTS - TIH TO 7414' - SET RTTS - TEST CSG TO 1500 PSI FOR 10 MIN
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED
PP2 @ KILL SPEED
TIME (HRS)
O0 TOOH
@ 30
@ 50
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING 14.50
c&c 4.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS 4.00
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 13076
PRESENT DEPTH 10240
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: TRIPPING OUT W/STARTER MILL
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 12
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +0.0
DAYS SINCE LAST LTA 428
LAST BOP TEST 05/29L~~ LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @ 30
PP2 @ KILL SPEED @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
3.50 R/U SCHLUMBERGER -.~L~_[~_~]~L_~£[:~]" GUAGE RING/JUNK BSKT
2.50 M/U BAKER MODEL "D" PACKER - RIH - SET PACKER '*TOP']_~_!~z270' - POOH
W/gl & RUNNING TOOL
.50 R/D SCHLUMBERGER
2.00 BHA - M/U MONEL/MWD/WHIPSTOCK ASSEMBLY
1.00 RIH (5) STDS & TEST MWD
7.00 RIH W/WHIPSTOCK ASSEMBLY (SLOW THROUGH 7")
1.50 M/U TOP DRIVE - BREAK CIRC. - ORIENT WHIPSTOCK - TAG PACKER @ 10L263~
SET WHIPSTOCK 37 DEG RIGHT HIGH SIDE
1.50 MILL RUNNING LUG & START WINDOW
4.00 CIRC. - DISPLACE FIg W/FRESH WATER GEL - HAD TO GET FRESH WATER FROM
BOAT - PUMP FIg RETURNS DOWN DISPOSAL
.50 TOOH W/RUNNING TOOL/STARTER MILL
NOTEL RAW MINERAL OIL SPILL @ OSK DOCK FRIDAY - ORDERED 100 BBL TANK
FROM HALLIBURTON. TANK HAD BEEN USED ON ACID JOB & HAD TO BE
CLEANED. AFTER CLE6~1~_~6~z THE HATC~ COVER BOLTS WERE NOT
TIGHTENED. WEAVER BROS DELIVERED OIL BY TANKER TRUCK TO OSK
& FILLED 100 BBL TANK. PEAK TRUCK WENT TO MOVE TANK TO STAG-
GING AREAL AS TANK WAS BEING LOADED APPROX. 10 GAL OF OIL
SPILLED TO ASPHALT. OIL WAS CLEANED UP & SPILL REPORTED TO
DEC
TIME (HRS)
CUM. ROT. HRS 1.50
ROTATING 1.50
MUD MOTOR
TRIPPING 7.50
C & c 4.00
REAMING
SURVEYS 1.50
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS 2.00
INSPECT BHA
RIG UP/TEAR DOWN
~AIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 7.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: TRIPPING
PROG. DEPTH 13076
PRESENT DEPTH 10259
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
7.50 POOH W/STARTER MILL & RUNNING TOOL
1.00 P/U 6 1/8" WINDOW MILL~ FLOAT SUB W/FLOAT
DC,S
4.00 TIH
ELEVAT. KB TO MSL 116.0 DATE 06/05/94
DIST. KB TO BHF 41.0 DAY 13
NLTA lTH/YTD / 1 EST. DAY 51
LTA 1TH/YTD / DAYS +/- +0.0
DAYS SINCE LAST LTA 429
LAST BOP TEST 05/29/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 480 @ 30
PP2 @ KILL SPEED 620 @ 50
TIME (HRS)
CUM. ROT. HRS 9.50
5.50 MILL CASING FROM 10~241' TO 10~254'
2.50 MILL FORMATION FROM 10~254~ TO 10~259'
1.50
NOTE~ CAN NOT ADD MUD (GEL/BAR) COSTS TO REPORT~ DUE TO NO DELIVERY
TICKET FOR FRESH WATER GEL AND BARITE FROM MUD COMPANY.
, NEW WOBBL~ ~!~ ~ ~}! ~_3/~'f ROTATING 8.00
TRIPPING 13.00
· c & c 1.50
REAMING
CIRC. BOTTOMS UP .'~ ~.,J'~ ~\~URVEYS
~-PI LL
TO~.
JET
~' ~'~" REPAIRS
...... T~,'~ --~--
NU/~ RECIEVED VERBAL APPROVAL FROM BLAIR WONZELL (AOG~£:~)~ON ~A.~._~~ FISHING
6]~-94 TO DELAY BOP TEST UNTIL MONDAY (6-6-9~g:~:~ .... DELA~¥EST NiP UP/DOWN /BOP/WH
UNTIL AFTER MILLING OPERATIONS ARE COMPLETED. TESTING BOP /WH
1.50
1.50
NOTEL HOLE TAKING APPROX. 2.5 BBL/HR
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: TESTING BOPS
'EPI ALASKA DAILY DRILLING REPORT
PROG. DEPTH 1'3076
PRESENT DEPTH 10259
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PAGE 1 OF I
ELEVAT. KB TO MSL 116.0 DATE ~/_.~O~Z~
DIST. KB TO BHF 41.0 DAY 14
NLTA LTH/YTD ___/__! EST. DAY 51
LTA LTH/YTD / DAYS +/- +0.0
DAYS SINCE LAST LTA 430
LAST BOP TEST 06/06/94 LAST CSG TEST ~L~
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 480 @ 30
___
PP2 @ KILL SPEED 620 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.00 TOOH .~Z~_!£~_WINDOW MILL
.50 L/D BHA - P/U NEW BHA (WINDOW .ULLL~_~IEL~_~/LL~ WATERMELLON MILL)
3.00 TIH TO 6400' - M[U TOP
.50 FILL PIPE
1.00 TIH TO 9091~ - TAG TIGHT SPOT
4.50 E[6U_l!g~!_~g!~_!~_~8~!~g_:_~g~!l~_~!~l~!~!l~g~i~!~l~f~gi~
1.O0 FILL TRIP TANK - MIX & PUMP DRY JOB
6.50 TOOH
.50 L/D BHA - GUAGE BHA - TOOLS SLIGHTLY UNDER FULL GUAGE
2.50
NOTE£ HOLE TAKING APPROX. 2 BBL/HR
NOTE[ FIRE ALARM SOUNDED @ 1308 HRS - SECURED WELL IN 2 MIN. - ALL
REPORTED TO REC ROOM & WERE ACCOUNTED FOR - FALSE ALARM
NOT~i GOOD JOB DONE ON SLOP WATER TANK/PIPING PROJECT~ JEROME DODGE
....... £!~LEI_~L!_[g~_~E6~!~g_U~_~L6~ JERRY JOHNSON (INLET) FOR GET
TING STEEL @ DISCOUNTED PRICE & FOR BIDDING TANK FAB. IN TOWN~_
JIM YORK & SPIKE GRUBB FOR INSTALLATION~ g PRODUCTION FOR USE
OF SURPLUS GOULDS PUMP.
NOTEI SENT MILLS TO TOWN TO BE TURNED DOWN TO 6" - WILL ATTEMPT TO
CLEAN OUT CASING & DRILL W/6" TOOLS.
TIME (HRS)
CUM. ROT. HRS 14.00
ROTATING 4.50
MUD MOTOR
TRIPPING 14.50
C & C 1.00
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH 2.5~
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS 1.O0
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
~ORING
OTHERS .50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE I OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: PREP FOR DISPLACING W/LV2000 MUD
PROGo DEPTH 13076 ELEVAT. KB TO MSL 116.0 DATE ~L~7/94
PRESENT DEPTH 10259 DIST. KB TO BHF 41.0 DAY 15
FOOTAGE DRILLED NLTA LTH/YTD / 1 EST. DAY 51
SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- +0.0
DEP. OF LAST CSG 11532 DAYS SINCE LAST LTA 431
WATER DEPTH 80 LAST BOP TEST 06/06/94 LAST CSG TEST 06/03/94
/ BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 480 @ 30
PP2 @ KILL SPEED 620 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
5.50 FINISHED WEEKLY BOPE TEST. INSTALLED WEAR BUSHING.
7.50 U6EI_U~_6'Z_ELg~Q6!!g~_U!LL_6~UI~ TIH.
2.00 ELONGATE CSG WINDOW W/MILL ASSMY #4 F/~241' T/10~259~.
9.00 PREP PITS FL[LU!~_~U6~[_g%~E~_~L[6~_~!I~ INJECT FRESH WATER GEL MUD
DOWN DISPOSAL WELL. CLEANED DRAINS/DRIP PANS/PIPE RACK DRAINS AND TRIP
TANK. FILLED PIT #2 W/100 BBLS FIW/ZANVIS PILL F/SPACER.
WELL HAS TAKEN 45 BBLS TODAY. (2 BBLS HOUR RATE)
TODAYS MUD COST REFLECTS GEL/BAR ADDED SEVERAL DAYS AGO AS WELL AS
COST TO CHANGE OVER TO tV2000 MUD.
NOTEi THANKS TO CYNTHIA VELEZ (HOUSTON) FOR
INVOICE GETS PROCESSED IN THE NET 7 DAYS TO GET THE 2% DIS-
COUNT (APPROX. $6300~MONTH) - GOOD JOB
TIME (HRS)
CUM. ROTo HRS 16.00
ROTATING 2.00
MUD MOTOR
TRIPPING 7.50
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH 5.50
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING'
~'~T Ll~ O C n n~
:PI ALASKA DAILY DRILLING REPORT
PACE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: TIH W/BIT #-1 ON MUD MOTOR ASSMY
PROG. DEPTH
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
13076 ELEVAT. KB TO MSL 116.0 DATE
~ DIST. KB TO BHF 41.0 DAY 16
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +0.0
DAYS SINCE LAST LTA 432
LAST BOP TEST 06/06/94 LAST CSG TEST ~Lg3/9~
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @ 30
PP2 @ KILL SPEED @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
16.00 PUMP ZANVI~_~6~_~6CED GEL MUD WITH LV2000 MUD. WITH OIl MUD
AROUNDI SHUT DOWN AND CLEANED POSSUM BELLIE~z AND SAND TRAP. CIRC AND
AND CONDITION T/PROPER RHEOLOGY.
8.00 PUMP DRY J~_~gH U/6" MILL ASSMY #4 AND LAYED IT DOWN. MAKE uP_~!ZE1~
~_~L~']~_~ MOTOR ASS~z ORIENT AND CHECKED OUT MWDz OK. TIM AT RPT
TIME.
NOTE: MILL WEARz WINDOW MILL OUT 1/8" STRING MILL OUT 1/16" AND THE
WATERMELON MILL WAS OUT 1/32"
NOTE: TORQUE READINGS WITH WATER/GEL MUD
AT 80_~~_~.IGHT WAS 210K. DRAG UP WAS 85K~ DOWN WAS 50K
WITH OIL BASED MUD: TORQUE WAS 10~500 FT/L~z 215K W~_6~_~_~~ DRAG
UP WAS 60K AND DOWN WAS 4OK. AL1 ABOVE WAS AT 10242~ T/10259' DEPTH.
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /NH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
16.00
8.00
16.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 10546
FOOTAGE DRILLED 287
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: ALTERNATLY SLIDING/ROTARY DRLG
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.00 FINISH TRIP IN HOLE T/WINDOW AT 10251'
2.00 BREAK CIRC. WORK THRU WINDOW AND ORIENT.
ELEVAT. KB TO MSL 116.0 DATE 06/09/94
DIST. KB TO BHF 41.0 DAY 17
NITA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +1.8
DAYS SINCE LAST LTA 433
LAST BOP TEST ~~ LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 700 @ 30
PP2 @ KILL SPEED 1050 @ 50
16.00 ALTERNATLY SLIDE/ROTATE/SURVEY F/10259~ T/10546' W/BIT #1.
ROTAZ~_~_~_~IDE 6 HRS AND SURVEYS/CONNECTIONS 5 HRS.
HOLE HAS NOT TAKEN ANY FLUID SINCE CHANGE OVER T/LV2000 MUD SYSTEM.
--
TIME (HRS)
CUM. ROT. HRS 27.00
ROTATING 5.00
MUD MOTOR 6.00
TRIPPING 6.00
C & C
REAMING
SURVEYS 7.00
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT ING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
COR [NG
~THFRS
'~WEPI ALASKA DAILY DRILLING REPORT ~..~x= PAGE 1 OF I
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 10741
FOOTAGE DRILLED 195
SIZE OF lAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: DRILLING AHEAD W/BIT #2
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
8.50 ALTERNATLY SLI~L~6~L~URVEY F/10546~ T/10674~
12.00 PUMP DRY .~_~_~_DRY JOB NO GOOD) LAYED DOWN I MONEL ,~_~_
UP 1 JT MONEL HWDP. MOVED 4 STDS 3 ~L~" FROM DERRICK TO BOTTOM OF THE
STRING. (WE MOVE DP AROUND EACH TRIP TO REDUCE WEAR) MAKE UP.~_~_
ELEVATo KB TO MSL __!!A=g DATE
DIST. KB TO BHF 41.0 DAY 18
NLTA LTH/YTD / I EST. DAY 51
LTA LTH/YTD / DAYS +/- +2.8
DAYS SINCE LAST LTA 434
LAST BOP TEST 06/06/94 LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 700 @ 30
PP2 @ KILL SPEED 1200 @ 50
TEST
.50
3.00 ALTERNATLY SLIDE/ROTAT~Z§URVEY F/10674' T/10741' AT RPT TIME.
BIT #1 COND: 2-3-ER-A-E-I-NO-HRS
ROTA~_~_~E~z SLID[_~_~E~z SURVEY/CONNS 2.5 HRS
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
"EVALUATION
CORING
OTHERS
36.00
4.00
5.00
12.00
1.00
2.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF I
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
lEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076 ELEVAT. KB TO MSL 116,0 DATE 06/11/94
PRESENT DEPTH 11160 DIST. KB TO BHF 41,0 DAY 19
FOOTAGE DRILLED 419 NLTA LTH/YTD / 1 EST. DAY 51
SIZE OF LAST CSG 7.000 1TA LTH/YTD / DAYS +/- +5.8
DEP. OF LAST CSG 11532 DAYS SINCE LAST LTA 435
WATER DEPTH 80 LAST BOP TEST 06/06/94 LAST CSG TEST 06/03/94
/ BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: DRILLING AHEAD W/BIT #2
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
24.00 ALTERNATLY SLIDING/ROTATING/SURVEY F/10741' T/ll160~ W/BIT #2.
ROTATE 7.0 HRS~ SLIDE 10.5 HRS~ SURVEY/CONNS 6.5 HRS.
PP1 @ KILL SPEED
PP2 @ KILL SPEED
750 @ 30
1200 @ 50
~__
TIME (HRS)
CUM. ROT. HRS
ROTAT I NG
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
53.50
7.00
10.50
6.50
£PI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: SERVICING RIG
PROG. DEPTH 13076
PRESENT DEPTH 11174
FOOTAGE DRILLED 14
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 20
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +4.8
DAYS SINCE LAST LTA 436
LAST BOP TEST 06/06/94 LAST CSG TEST
BNA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 750 @ 30
PP2 @ KILL SPEED 1200 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.50 ALTERNATELY SLIDING/ROTATING/SURVEYING F/11160' T/11174' W/BIT #2.
BECAME BIT STUCK AT 11174~. SUPECT "HR" COAL. (CAN STILL ROTATE)
3.00 JAR AND WORK DRILL STRING~ CAME FREE.
1.00 POH T/~9~_~9_Z~_~9~_~gL[_~_~99~_~9~ ........
5.50 ~_~[~_~9~_~9~ .....................................
2.00 LAY DOWN MONELS~ MWD. CHANGED OUT JARS. MAKE UP NEW BHA.
3.50 TIH T/TOP OF LINE~_~Z_Z~QQL~_~L~Q_~ BIT JETS PLUGGED.
2.50 POH T/2333' W/WET_~_Z~~_6~_~L~_~Q_9~Z_QF DP. SECURED
W/FL~Q~_~6~E, RAN HOSE T/TRIP TANK TO LET AIR BELCH OUT. TRY T/PULL
ANOT~_~, SAME THING HAPPENES EACH TIME MOVE PIPE. INSTALLED
FLOOR ~ LEFT IN OPEN POSITION W/HOSE T/TRIP TANK.
5.00 CLEAN UP MESS ON AND AROUND RIG. SERVICE RIG. WAIT ON DIA-LOG TO PERF
HOLES ABOVE DC'S TO CIRC OUT TRAPPED AIR. MUD IS SO THICK AIR DOES NOT
MIGRATE UNTIL PIPE IS MOVED THEN IT BELCHES OUT.
__
BIT #2 COND: 3-4-BT-A-E-1/8-ER-BHA
NOTE: HELD WEEKLY DRILL "INTRUDER" SCENARIO~ REVIEWED ERP W/HANDS.
BOTH CREWS HAD TRIP DRILLS.
TIME (HRS)
CUM. ROT. HRS 54.50
ROTATING .50
MUD MOTOR .50
TRIPPING 14.50
C & C
REAMING
SURVEYS .50
JET
REPAIRS
FISHING 3.00
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
k/AIT ON WEATHER/MAT
EVALUAT I ON
CORING
OTHERS 5.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 11196
FOOTAGE DRILLED 22
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE 06/13/94
DIST. KB TO BHF 41.0 DAY 21
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD .... / .... DAYS +/- +4.0
DAYS SINCE LAST lTA 437
LAST BOP TEST 06/06/9~ LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PRESENT ACTIVITY: MAKE UP MOTOR BHA
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
2.00 PREVENTIVE MAINTENANCE ON RIG WHILE WAIT ON DIA-LOG.
PP1 @ KILL SPEED
PP2 @ KILL SPEED
3.00 RIG UP DIA-Lq~ RUN IN HOLE W/TBG PUNC~ 5 SHOT GUN. PRESSURE UP TO
300 P~z MADE S~ PRESSURE FELL OFF. POH RIG DOWN DIA-LOG. GUN FIRED
2.00 POH W/BIT_~z CLEANED 1/2 GALLON OF SCALE OUT OF BIT AND BIT SUB.
CHANGED JETS T/3-14'S.
6.0~ TIH T/11016' W/BIT #3~ FILLED PIPE AT 400~_Z~_.10215~_~!~,.
1.50 REAMED F/llO16' T/lll~ 750 UNITS GAS FROM BOTTOM.
3.00 DRILL AND WORK THRU 8' COAL SEAM~ F/11174' T/11182' DRILL ON T/11196'
1.50 CIRC BOTTOMS UP TO ASSURE ALL COAL SEAM WAS DRIl[[~ WAS. WENT DOWN/UP
THRU COAL SEAM W/PUMP OFF AND NOT ROTATIN~_NO PROBLEM ....
5.00 POH W/BIT #3R~ TIGHT SPOTS AT 10893' AND 10482'. lAY DOWN CLEAN OUT
ASSMY AND MAKING UP MOTOR ASSMY AT RPT TIME.
BIT #3RR COND: 1-1-N-A-E-I-NO-BHA-._~
390 @ 30
670 @ 50
TIME (HRS)
CUM. ROT. HRS 57.50
ROTATING 3.00
MUD MOTOR
TRIPPING 13.00
c & c 1.50
REAMING 1 .50
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT 2.00
EVALUATION
CORING
"~'~'~EPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 11453
FOOTAGE DRILLED 257
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: DRILLING AHEAD ~L~IT #4
ELEVAT. KB TO MSL 116.0 DATE 06/14/94
DIST. KB TO BHF 41.0 DAY 22
NLTA LTH/YTD / 1 EST. DAY _~}
LTA LTH/YTD / DAYS +/- +5.5
DAYS SINCE LAST LTA 438
LAST BOP TEST 06/06/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILl SPEED 660 @ 30
PP2 @ KIlL SPEED 1240 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
5.50 MAKE UP MOTO~_B~U], ORIENT MWD~_~_~L!~_~_~_~K. CONT. TIH
1.00 ~CUT DRILLING LINE 100' AT 10170~
1.00 FILL PIR[~_I[~I_~_~g~K THRU WINDOW.
1.00 FINISHED T!~_ZZ!!!~gL~_~AKE UP TQ~_R[~[~ BREAK CIRC.
~5.50 ORIENT MOTg[~_B[[~[~B[~Z_~IDE.ROTATE/SURVEY F/11196' T/11453'
BOTTOMS UP GAS 480 UNITS.
HAD FIRE D~LL~ ALL RESPONDED PROPERLY.
ROTATE 4.5._~[~_SLIDE 8.0 HRS~_~URVEY 3.0 HRS
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
70.00
4.50
8.00
6.50
3.00
2.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 11691
FOOTAGE DRILLED 238
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: TESTING BOPE (AOGCC WITNESSING)
ELEVAT. KB TO MSL 116.0 DATE ~Z!~Z~E
DIST. KB TO BHF 41.0 DAY 23
NLTA LTH/YTD ___/_ 1 EST. DAY 51
LTA LTH/YTD ___/ .... DAYS +/- +6.8
DAYS SINCE LAST LTA 439
LAST BOP TEST 06/15/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 740 @ 30
PP2 @ KILL SPEED 1130 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
15.00 ALTERNATLY SLIDE/ROTATE/SURVEY F/11453~ T/l1691~ W/BIT #4
8.50 CHECK EZELg~_NgN[=_RoH T/WZ~Rg~ SNUG SPOT AT 11185. DROP BALL TO
SHIFT SLEEVE IN PUMP OUT S~_PRESSURED UP T/4600 PSI. DID NOT SHIFT.
RgU~_kBZ_R9~_U~D-
.50 PULLED WEAR BUSHIN~_~[~_WEEKLY BOPE TESTING. MR. LOU GRIMALDI OF
THE ALASKA OIL AND GAS CONSERVATION COMMISSION HERE WITNESSING TEST.
SLIDE 6.5 ~_~U~XEYS 3.5
TIME (HRS)
CUM. ROT. HRS 79.50
ROTATING 3.00
MUD MOTOR 6.50
TRIPPING 8.50
C & C
REAMING
SURVEYS 3.50
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH .50
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
.WEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 11779
FOOTAGE DRILLED 88
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: DRILLING AHEAD W/BIT #3RR
ELEVAT. KB TO MSL 116.0 DATE ~Z16/94
DIST. KB TO BHF 41.0 DAY 24
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD ___/___ DAYS +/- +6.2
DAYS SINCE LAST LTA 440
LAST BOP TEST ~~ LAST CSG TEST ~3/94
BHA INSPECTION (CUM. ROT HRS)
PPl@ KILL SPEED 800 @ 30
PP2 @ KILl SPEED 1200 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
4.00 FINISHED WEEKLY BOPE TESTING. OK. INSTALLED WEAR BUSHING.
2.50 PICKED UP/SLM/DRIFT 57 JTS OF 3 1/2" S-135 DRILL PIPE.
.50 MAKE UP TOP DRIVE AND CIRC HARD THRU DRILL PIPEL PUMPED A HAIR BALL
PILL THRU TO REMOVE SCALE.
1.50 POH W/3 1/2" DRILL PIPE.
6.50 MAK~_~_~6~_Z~_~~ OK. TIH W/BIT #3RR, ROLLED OFF A LEDGE AT 10256
.50 MAKE UP TOP DRIVE~ BREAK CIRC AT 11670'
8.50 ALTERNATLY SLIDE/ROTATE/SURVEY F/11691' T/11779~ W/BIT fl3RR.
SLIDE 6.0 HRSL SURVEY 1.5 HRS
BIT #4 COND: 3-4-LT-H-F-I-ER-HRS *NUMBER 2 CONE JOURNAL BEARING FAILED
********NOTE THIS CORRECTED "PRESENT DEPTH" MORNING REPORT************
TIME (HRS)
CUM. ROT. HRS 25.00
ROTATING 1.00
MUD MOTOR 6.00
TRIPPING 8.00
c & C 1.00
REAMING
SURVEYS 1.50
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH 4.00
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS 2.50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 12006
FOOTAGE DRILLED 227
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: CHANGING BHA TO ROTARY ASSMY
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 25
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +7.8
DAYS SINCE LAST LTA 441
LAST BOP TEST 06/15/94 LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 780 @ 30
PP2 @ KILL SPEED 1160 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
18.00 ALTERNATLY SLIDE/ROTATE/SURVEY F/11779' T/12006~ W/BIT #3RR.
6.00 CHECK F.FLOW~ NONE. POH T/WINDO~_D~_~ PUMP DRY JO~ POH. LAY
DOWN MOTOR ASSMY AND MAKING UP ROTARY ASSMY AT RPT TIME.
BIT #3RR COND: 4-5-BT-M/H-E-I-LT/ER-HRS/BHA**DIRECTIONAL WORK WAS DONE
ROTATE 4.0 HRS~_~L~DE_~=~_~ SURVEY/CONNS/REAMING 5.5 HRS
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAM I NG
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
99.00
4.00
8.50
6.00
2.00
3.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
UELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: DRILLING AHEAD
PROG. DEPTH 13076
PRESENT DEPTH 12243
FOOTAGE DRILLED 237
SIZE OF LAST CSG 7.000
DEP. OF"LAST CSG 11532
WATER DEPTH 80
/
ELEVATo KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 26
NLTA LTH/YTD ___/__~ EST. DAY 51
1TA LTH/YTD / DAYS +/- +9.1
DAYS SINCE LAST LTA 442
LAST BOP TEST ~L]5/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 700 @ 30
PP2 @ KILL SPEED 1220 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.50 TIH W/BIT #5.
3.00 REAM F/11246 THRU TIGHT SPOTS T/12006~
14.50 DRLG F/12006' TL 12243' W/BIT #5.
TIME (NRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TEST ING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
14.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE I OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 12395
FOOTAGE DRILLED 152
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: DRILLING AHEAD W/BIT #6
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 27
NLTA LTH/YTD / I EST. DAY 51
LTA LTH/YTD / DAYS +/- +9.3
DAYS SINCE LAST LTA 443
LAST BOP TEST 06/15/94 LAST CSG TEST ~03/9~
BHA INSPECTION (CUM° ROT HRS)
PP1 @ KILL SPEED 740 @ 30
PP2 @ KILl SPEED 1160 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
7.50 DRLG F/12243~ T/12385' W/BIT #5.
16.00 £UE~E_fLfLDN~ NONE. POH T/WtNDOW~_§LU~_~I~[, POH. CHANGED BHA TO LOCK
6~ TIH. TIGHT SPOTS AT 11782', 11487~ AND 10741 ON TRIP OUT.
TAG LED~ZDg[_~Z_~ZZ~_~DZ~_Z~_Z~_~[~_~D[_UP TOP DRIVE AND
CLEANED .~[_[Z11778' T/11806'. (HAS BEEN A TROUBLESOME SPOT BEFORE)
NOTED AS THE "HKI". TOOK ABOUT AN HOUR TO WORK THE STIFF ASSMY THRU
THE WINDOW BUT AFTER THE BIT WENT THRU THE ASSMY FOLLOWED OK.
.50 D~L~_fZ12385, T/11395' w/BIT #6.
BIT #5 COND: 4-5-8T-H-E-I-ER/SD#1-HRS
RECOGNITION FOR A JOB WELL DONE~ AND THEN SOME~ DUE JIM OLIVER AND
ERIC BROWN OF ANADRILL. JIM RAN THE "SLIM 1" TOOL WITH "ZERO DEFECTS"
KUDOS TO DAVE AND JERONE WHO WERE HERE TOO. AND THEN ERICI ERIC HAS
MORE HOURS ON ERIC THAN THE LONGEST BIT RUN .... HE IS THERE THROUGH OUT
THE MOTOR RUNS AND THERE DURING THE BHA CHANGES. ERIC HAS DONE A VERY
OUTSTANDING JOB. HE PUTS IN MANY LONG HOURS TO ASSURE THE DESIRED
RESULTS OF THE WELL PLAN ARE MET.
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
121,50
8.00
16.00
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PROG. DEPTH 13076
PRESENT DEPTH 12700
FOOTAGE DRILLED 305
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: POH W/BIT #6 F/TLC LOGS
ELEVAT. KB TO MSL 116.0 DATE ~L20/94
DIST. KB TO 8HF 41.0 DAY 28
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +11.4
DAYS SINCE LAST LTA 444
LAST BOP TEST g~L!~L~ LAST CSG TEST
BHA INSPECTION (CUM. ROT HRS)
PPl@ KILL SPEED 700 .@ 30
PP2 @ KILL SPEED 980 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
18.50 DRLG F/12395t T~12700' W/BIT #6.
5.50 CHECK FL~g~_~g~=_~_~_~9~=_6~_~~ BIT A-T RPT TIME.
BIT #6 COND: 5-7-BT-MH-E-1-LT/JD-HRS
SNUG SPOTS AT 11~_!~Z~_.10683 (20-30K OVER)
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAM I NG
SURVEYS
JET
REPAIRS
FISHING
NiP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT l NG
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
140.00
18.50
5.50
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: WELLS R V
PRESENT ACTIVITY: LOGGING
PROG. DEPTH
PRESENT DEPTH
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
13076 ELEVAT. KB TO MSL 116.0 DATE 06/21/94
12700 DIST. KB TO BHF 41.0 DAY 29
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD ___/___ DAYS +/- +11.5
DAYS SINCE LAST LTA 445
LAST BOP TEST 06/15/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 700 @ 30
PP2 @ KILL SPEED 980 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.O0 CUT & SLIP DRLG. LINE
2.00 SERVICE RIG/CLEAN RIG FLOOR
3.00 MOVE DCtS TO LEFT SIDE OF PIPE RACK - PREPARE TO RUN DRILL PIPE CON-
VEYED LOGS - M/U LOGGING TOOLS & WET CONNECT - CHECK TOOLS
3.00 TIH TO 4475'
.50 CIRC & CONDITION MUD FOR LOGS
2.00 TIH TO 7381~
.50 CIRC & CONDITION MUD
1.50 TIH TO.~200'
.50 CIRC & CONDITION MUD - HOLD PRE-LOGGING SAFETY MEETING
__
3.00 R/U SIDE ENTRY SUB - HANG SHELVE FROM CROWN & V DOOR - RIH W/WIRELINE
(WET CONNECT) & LATCH-UP DOCKING HEAD - CHECK SIGNAL (OK) - M/U CLAMP
ON ENTRY SUB FOR WIRELINE
3.00 TIH LOGGING.~_!~6BO' - TOOH LOGGING
2.00 EVALUATE LOGS - R/D SIDE ENTRY SUB - POOH W/WIRELINE
NOT~i RECEIVED VERBAL FROM HOUSTON TO DRILL 200' - WILL TD @ APPROX.
@ 12~880'
TIME (HRS)
CUM. ROT. HRS
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
140.00
18.00
JEPI ALASKA DAILY DRILLING REPORT ~,~.,,~,
PAGE I OF 1
RIG NAME PLATFORM
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: DRILLING
PROG. DEPTH 13076
PRESENT DEPTH 12872
FOOTAGE DRILLED 172
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
ELEVAT. KB TO MSL 116.0 DATE ~L[~/94
DIST. KB TO BHF 41.0 DAY 30
NLTA LTH/YTD / 1 EST. DAY 51
~TA LTH/YTD / DAYS +/- +12.0
DAYS SINCE LAST LTA 446
LAST BOP TEST 06/15L~~ LAST CSG TEST ~L~
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 640 @ 30
PP2 @ KILL SPEED 920 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
3.50 PUMP PILL - TOO~_~ZLOGGING TOOLS
1.50 L/D LOGGING TOOLS - R~ SHEEVES
1.00 ~/U BIT #7 & BHA
6.00 TIH - FILL PIPE
12.00 DRLG FROM
NOTEi RECEIVED VERBAL APPROVAL FROM BLAIR gONZELL (AOGCC) TO POST
PONE WEEKLY BOP TEST DUE TO BEING @ TD.
NOTE./ TD WILL BE
NOTEi HIGH DailY COST DUE TOi WHIPSTOCK INVOICE_~]Z~]~_Lg~G
L ....... ~g~_~~g~_~D BECAUSE THE MORNING REPORT GENERATED FOR
THE 21ST WAS CREATED LATE IN THE EVENINGz COSTS ARE REFLECTED
ON TODAYS REPORT.
TIME (HRS)
CUM. ROT. HRS 152.00
ROTATING 12.00
MUD MOTOR
TRIPPING 9.50
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DO~JN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENT I NG
PICKUP/LAY DOWN DS 2.50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON UEATHER/MAT
EVALUAT I ON
CORING
OTHERS
SWEPI ALASKA DALLY DRILLING REPORT
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 13076
PRESENT DEPTH 12880
FOOTAGE DRILLED 8
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: RUNNING 4 1/2" LINER
PAGE 1 OF 1
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 31
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- __~
DAYS SINCE LAST LTA 447
LAST BOP TEST 06/15/94 LAST CSG TEST ~L~3/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 640 @ 30
PP2 @ KILL SPEED 920 @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
5o DRLG FRR~_~SF2' TO 12~880'
3 00 CIRC. & CONDITION MUD - (RAN CENTRIFUGE)
2 O0 TOOH TO WINDOW - HAD SEVERAL TIGHT SPOTS
1 50 TIH - TAG BOTTOM
1 50 TOOH TO WINDOW - MUCH BETTER
50 PUMP PILL
5 50 TOOH TO RUN LINER
I 50 CLEAN RIG FLOOR & PREPARE TO RUN LINER - HOLD PRE-JOB SAFETY MEETING
3 50 P/U & RUN 67 JTS 4 1/2" 11.6# N80 BTC SLOTTED LINER - M/U BAKER LINER
HANGER & RUNNING TOOL
3.00 TIH W/DRILL PiPE TO WINDOU
1.00 ClRC DRILL PiPE VOLUME
· 50 TIH W/DRILL PIPE
IADC DULL GRADE BIT fl7 3-3-WT-H-E-I-BT-TD
--
TIME (HRS)
CUM. ROT. HRS 152.50
ROTATING .50
MUD MOTOR
TRIPPING 14.00
C & C 4.50
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING 3.50
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/M'AT
EVALUAT I ON
CORING
_ - _
SWEPI ALASKA DAILY DRILLING REPORT
PAGE 1 OF 1
RIG NAME PLATFORM "A,
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: CIRC. FIW
PROG. DEPTH 13076
PRESENT DEPTH 12880
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
.50 TIH W/LINER
ELEVAT. KB TO MSL 116.0 DATE
DIST. KB TO BHF 41.0 DAY 32
NLTA LTH/YTD / 1 EST. DAY 51
1TA 1TH/YTD ___/___ DAYS +/- +13.0
DAYS SINCE LAST LTA 448
LAST BOP TEST g6/15/94 LAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED 160 @ 30
PP2 @ KILL SPEED 330 @ 50
------
1.00 M/U TOP DRIVE - BREAK CIRC - TAG BOTTOM - CIRC (1) DP VOLUME
.50 DROP BALL & PUMP DOWN - PRESSURE UP TO 1500 PSI - SET & GET OFF LINER
LINER TOP_~_~!~L__
9.00 DISPLACE MINERAL OIL MUD U/FIW - CLOSE RAMS & REVERSE OUT @ 3 BBL/MIN
@ 500 PSI - PUMP MINERAL OIL MUD TO STORAGE .~6~§~_~LEAN PITS & TRIP
TANK
4.50 TOOH W/LINER SETTING TOOL
.50 L/D BHA OUT OF DERRICK
4.50 M/U BIT & SCRAPER - TIH TO 9195~
3.50 CIRC & CONDITION FIW - PUMP (1) CIRC @ 300 GPM IN CLOSED SYSTEM - DISP
LACE HOLE W/CLEAN FIW - PUMP RETURNS DOWN DISPOSAL
NOTEZ TOP OF 4 1/2" LINER @ 1.~150'
NOTEZ RECEIVED FROM BOAT 25~978 GAL DIESEL FUEL
SWEPI ALASKA DAILY DRILLING REPORT
TIME (HRS)
CUM. ROT. HRS 152.50
ROTATING
MUD MOTOR
TRIPPING 9.50
C & C 13.50
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS .50
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS .50
PAGE 1 OF 1
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM "A"
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PROG. DEPTH 13076
PRESENT DEPTH 12880
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PRESENT ACTIVITY: RUNNING SLICKLINE
ELEVAT. KB TO MSL 116.0 DATE ~Z~L~
DIST. KB TO BHF 41.0 DAY 33
NLTA LTH/YTD / 1 EST. DAY 51
LTA LTH/YTD / DAYS +/- +13.5
DAYS SINCE LAST LTA 449
LAST BOP TEST 06/15/94 lAST CSG TEST 06/03/94
BHA INSPECTION (CUM. ROT HRS)
PP1 @ KILL SPEED @ 30
PP2 @ KILL SPEED @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.00 CIRC. W/FIW
3.50 TOOH W/ 7" CASING SCRAPER
.50 L/D BHA - PULL WEAR BUSHING
1.00 R/U TO RUN 3 1/2" COMPLETION STRING
12.50 HOLD PRE-JOB SAFETY MEETING - P/U & RUN 3 1/2" COMPLETION STRING
.50 CIRC. (2) TBG VOLUMES IN ATTEMPT TO CLEAN ANY EXCESS DOPE OUT OF TBG
CONN
1.00 DRAIN STACK - LAND TBG HANGER - RUN IN LOCKING PINS
4.00 R/U SLICKLINE & LUBRICATOR - RIH & SET PLUG BODY - POOH - RIH & SET
PRONG
NOTEi WL/REG @ 9150'~ BAKER MODEL FHL PACKER @ 9078_'_z GLM //8 @ 8995'_
//7 @ 8429' ~__~6__8__78_3_0L~ //5 @ 7!68'_~ //4 @_6!~4_1~ //3 @ 4879'~ ....
//2 @ 3487'_.~ //1 @ 2032~_x BAKER FV6 SSSV @ 282~
RAN 292 JTS OF 3 1/2" TBG (33 JTS NEW L80~ 244 JTS J55~ 15 JTS
N80) ALL 8RD EUE.
TIME (HRS)
CUM. ROT. HRS 152.50
ROTATING
MUD MOTOR
TRIPPING 3.50
c & c 1.50
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING 14.50
CEMENTING
PICKUP/LAY DOWN DS .50
INSPECT BHA
.....
RIG UP/TEAR DOWN
WAiT ON WEATHER/MAT
EVALUATION
SWEPI ALASKA DAILY DRILLING REPORT
RIG NAME PLATFORM "A"
FIELD MIDDLE GROUND SHOAL
LEASE PLATFORM
WELL A22-14LS
WORK ORDER 263850
SIDE TRACK
DRILLING FOREMAN: SELTZ R H
PRESENT ACTIVITY: RIG RELEASED
PROG. DEPTH 13076
PRESENT DEPTH 12880
FOOTAGE DRILLED
SIZE OF LAST CSG 7.000
DEP. OF LAST CSG 11532
WATER DEPTH 80
/
PAGE 1 OF 1
ELEVAT. KB TO MSL 116.0 DATE 9~L~6/94
DIST. KB TO BHF 41.0 DAY 34
NLTA LTH/YTD ___/__~ EST. DAY 51
LTA 1TH/YTD / DAYS +/- +15.0
DAYS SINCE LAST LTA 450
LAST BOP TEST 06/15/94 LAST CSG TEST 06/03/94
BHA INSPECT[ON (CUM. ROT HRS)
PP1 @ KILL SPEED @ 30
PP2 @ KILL SPEED @ 50
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
1.00 R/U TEST PUMP - PRESSURE UP ON TBG TO 2000 PSI - SET PACKER - PRESSURE
UP & TEST TBG TO 3500 PSI - BLEED TBG PRESSURE TO 1400 PSI - TEST
~_~/8" CSG TO lO00 PSI
2.00 ~_~ZPRONG - RIH - POOH W/PLUG - R/D LUBRICATOR & SLICKLINE UNIT
21.00 CLOSE SSSV - ~LD BOPS - PULL RISER - SET TREE - R/U WING VALVES &
FLOW LINE - R~ ALL 2" LINES (FIW & BACKSIDE TO ONDECK TANK) - CLEAN
WHR #1 - CLEAN ALL DRIP PANS & CELLAR AREA OF MINERAL OIL MUD - START
PREPARING RIG FOR MOVE
RIG RELEASED FROM A22-14LS @ 0600 HRS 06-25-94
NOTE2 DUE TO MAINTENACE BEING DONE IN ~~z THERE WILL NOT BE ANY
COMPUTOR GENERATED MORNING REPORTS UNTIL WED. 06-29-94
NOTEZ THANKS TO JESSE CRYER (SCHLUMBERGER) FOR WORKING WITH US ON
GETTING LOGGING TOOLS TO THE BEACH (ITS BEEN A NIGHTMARE).
THANKS TO JOE ROUSWELL (HALLIBURTON) FOR WORKING WITH US ON
500 BBL TANK RENTAL.
THANKS TO "ALL" ALIGNED INTEREST TEAM MEMBERS FOR A JOB WELL
DONE ON A22-14LS. KEEP UP THE GOOD WORKz IT IS NOT EASY!
TIME (HRS)
CUM. ROT. HRS 152.50
ROTATING
MUD MOTOR
TRIPPING
C & C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NIP UP/DOWN /BOP/WH 8.00
TESTING BOP /WH
RUNNING CASING
CEMENTING
PICKUP/LAY DOWN DS
INSPECT BHA
RIG UP/TEAR DOWN
WAIT ON WEATHER/MAT
EVALUATION
CORING
OTHERS 16.00
Mmln
SWEPI A~KA DALLY DRILLING REPORT ---- PAGE 1 OF 1
RIG NAME PLATFORH "A"
FIELD MIDDLE GROUNP ~HOAL
LEASE PLATFORM "A",
WELL A22-i4LS
WORK ORDER 2638~0
SIDE TRACK
ORILLING FOREMAN: ~ELTZ R H
PRESENT ACTIVITY: RIGGING UP CTU
PROG, DEPTH 12076
PRESENT DEPTH 12880
FOOTAGE DRILLED
SIZE OF LAST CSG Z,O00
OEP, OF LAST CSG 1!S22
WATER uErTH 80
/
ELEVAT. KB TO MSL !16,0 DATE
DIST. KB TO BHF _,, 41,0 DAY
NLTA LTH/YTD __1___1 EST, DAY 51
LTA LTH/YTD / DAYS +/-
DAYS SINCE LAST LTA
LAST BOP TEST 06/1S/74 LAST CSG TEST 0~/03/~ BHA INSPECTION (CUM, ROT HRS)
PP1 @ KILL SPEED
PP2 @ KILL SPEED
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
6.0~ MOUE CTU & MiSC EQUIP TO LOgER DECK - MOUE 250 BBL DIESEL TANK - FiLL
250 BBL TANK W/DIESEL - ADD FR!C!iON REDUCER & CIR~ TANK - PUMP 400
BBL DIESEL TO 500 BBL TANK - R/U ALL HIGH PRESSURE 2~ LINES FROH RIG,
I~ LEG ~! (CHOKE & FEED LINE TO CTU)
TIME (HRS). ._
CUM, ROT. HRS _ !52,50
ROTATING
MUD MOTOR
TRIPPING
C&C
REAMING
SURVEYS
JET
REPAIRS
FISHING
NiP UP/DOWN
TESTING BOP /~H
RUNNING CASING
CEHENTING
PiCKUP/LAY DOW~ DS
iNSPECT 8HA
Rig UP/TEAR DOWN
~!AiT ON WEATHER/MAT
EVALUATION
CORING
OTHERS
SUEPi ALASKA DAILY DRiLLiNG REPORT
PAGE t OF 1
RIG NAME P~TFORM "A"
FtELO N!DDLE GROUND SHOA~
LEASE PLATFORM,"A"
UELL ~22-!4LS
WORK ORDER ~
SIOE TRACK
DRILLING FOREMAN: SELTZ ~ H
PRESENT ACTIVITY: RIG RELEASED
PROG, DEPTH
PRESENT DEPTH 12800
FOOTAGE DRILLED
'0~
SIZE OF LAST C._,G 7,000
OEP, OF LAST CSG 1!_532
WATER DEPTH on
/
ELEVAT, KB l'O HSL t16,0 DATE 08t02/94.
D!ST, KB TO BHF _ 41,~ DAY 36
NLTA LTH/YTD / i EST. DAY
LTA LTH/YTD / DAYS +/-
OATS SINCE LAST LTA
LAST BOP TEST 06/!5/94 LAST CSG TEST ~6/~3/?q 8HA INSPECTION (CUH, ROT HRS)
PPi @ KILL SPEED ~
PP2 ~ ~-~
~ ,,I.L SPEED @ ._~
SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) :
~ FINISH RIGGING UP CTU & TANKS - R/U BOPS & RISER - TEST BOPS - RIH W/
CT TO 200' - PRESSURE UP ANNULUS TO ?00 PSi TO OPEN SSSV -BLEEO
PRESSURE - GOT GAS & OiL AT SHAKER - SHUT WELL IN (300 PSI CASING) -
RIH U/ COIL PUMPING~ ~ BBL/HiN FILI. .(GKTTTWR_.,, .,,~ OiL RKTII~i°~,.,..,,.,~, - NOTE:
..... ~L] -
1t,000 HAD TO CHOKE WELL U/700 PRY ,,,iF TO GAS TN THE PITS
t0,140' STARTED PUMPING DIESEL - WASH TO 80TTOM PUMPING 2 88L/WIN -.
CHECK UP UT EVERY i00' AT BOTT~ - COULD ONLY GET TO !2,800' W/ CO1;_
DUE TO PULLING 80% ~32 ^nn~ - PU~p 15 o~ V~.qe ....
, ,wv, ............. Y!LL FOLLOQED 8T_DiES~
W/FRICTION REDUCER ~ 1,5 TO 2,0 BGL/MiN - REEL COl! UP WHILE C!RC OWL_
PiLL - RiH TO 12,000' - DIESEL RETURNS VERY CLEAN - OPEN PROD, HEADER
ESTART GAS LiFTiNG - ~F~ £OiL UP ~ on~y~u ~,.
........ ~ ...... & PUMPING i im 88L
STOP PUMPING ~ 10~' - POOH W/COiL -
~TE - DID NOT GET GA£ LiFT GOing EARLY ENOUGH - ONLY HAD ~X 600~
ZOO,°°~ .ON_GAS LIFT, ~ELL ,,...,,.~.6PPKG~FO TO. CLEA~ UP RFA~..
TIME (HRS)
I CUM. ROT, HRS
I ROTATtNG
MUD MOTOR
I TRiPPiNG
IC&C
I REAMING
~ SURVEYS
JET
I REPAIRS
FiSHiNG
NIP UP/OOWN /BOP/WH
TESTING BOP /WH
RUNNING CASING
~ CEMENTING
' PTr~,'!tP/I 6Y O~(J~'i OS
drill Schlumberger
~].ient .... : SHELL WESTERN E & P
ield ..... : MIDDLE GROUND. SHOAL
11 ...... : A22-14LS
ection at: 209.63
~ineer..: ERIC BROWN
ts ..... : FEET
INC
o7/ol/94
Computation...: MINIMUM CURVATURE
Survey Date...: 06/23/94
KB Elevation..: 116.00 ft
Reference ..... : 34890
Magnetic Dcln.: 22.500 E
RECORD OF SURVEY
Pg: 1
MEAS INCLN DIRECTION VERTICAL-DEPTHS SECTION RELATIVE-COORDINATES
DEPTH ANGLE AZIMUTH BKB SUB - SEA D I STNCE FROM-WELL-HEAD
--.
/7 0 0.00 0.00 0.0 -116.0 -0.0 0.0 N 0.0 E
100 0.40 269.65 100.0 -16.0 0.2 0.0 S 0.3 W
200 0.22 267.02 200.0 84.0 0.5 0.0 S 0.9 W
i 300 0.50 330.04 300.0 184.0 0.3 0.4 N 1.3 W
400 1.61 263.80 400.0 284.0 0.9 0.6 N 2.9 W
CLOSURE
DISTNCE AZIMUTH
D
/lOO
0.0 0.00 0.00
0.3 269.65 0.40
0.9 269.09 0.18
1.3 285.34 0.45
3.0 281.33 1.48
500 3.01 235.69 499.9 383.9 4.1 1.1 S 6.5 W
600 6.33 215.92 599.6 483.6 12.0 7.0 S 11.9 W
700 8.91 217.75 698.7 582.7 25.1 17.6 S 19.9 W
800 11.35 217.90 797.1. 681.1 42.5 31.5 S 30.6 W
900 13.85 218.67 894.7 778.7 64.1 48.6 S 44.2 W
1000 15.88 218.07 991.3 875.3 89.4 68.7 S 60.1 W
1100 18.70 217.59 1086.8 970.8 118.8 92.2 S 78.3 W
1200 21.33 218.49 1180.8 1064.8 152.7 119.1 S 99.4 W
1300 23.91 217.80 1273.1 1157.1 190.7 149.4 S 123.1 W
1400 27.07 217.47 1363.3 1247.3 233.3 183.5 S 149.4 W
6.6 260.77
13.8 239.48
26.5 228.46
43.9 224.23
65.7 222.27
'91.3 221.17
121.0 220.34
155.2 219.84
193.6 219.50
236.6 219.16
1.77
3.64
2~59
2..44
2.50
·
2.0,~
2.
2.6~-
2.60
3.16
7 ].500 29.81 216.61 1451.2 1335.2 280.6 221.5 S 178.1 W
7 i600 32.54 216.67 1536.8 1420.8 331.9 263.0 S 209.0 W
'7 1700 35.74 215.64 1619.5 1503.5 387.7 308.3 S 242.1 W
7 1800 38.12 215.51 1699.5 1583.5 447.5 357.2 S 277.0 W
7 1900 37.81 215.38 1778.3 1662.3 508.6 407.3 S 312.7 W
284.2 218.80
335.9 218.47
392.0 218.13
452.0 217.79
513 [5 217.51
2.77
2.73
3.24
2.38
0.32
^Suation Types: 7/GYRO
***Grid and magnetic corrections have been applied to these surveys***
(Anadril (c)94 A2214LSD B1.52 12:38 PM 2)
A22-14LS Page 2 07/01/94
RECORD OF SURVEY
S HEAS INCLN DIRECTION
C DEPTH ANGLE AZIMUTH
7 2000 36.97 215.00
7 2100 37.17 214.75
7 2200 36.75 214.25
7 2300 36.86 213.79
7 2400 35.60 213.64
VERTICAL-DEPTHS
BKB SUB-SEA
SECTION
DISTNCE
1857.8 1741.8 569.1
1937.6 1821.6 629.1
2017.5 1901.5 689.0
2097.5 1981.5 748.7
2178.2 2062.2 807.7
RELATIVE-COORDINATES
FROM-WELL-HEAD
456.9 S 347.7 W
506.4 S 382.1 W
555.9 S 416.2 W
605.6 S 449.7 W
654.8 S 482.5 W
7 2500 36.28 213.47 2259.2 2143.2 866.3
7 2600 37.47 213.42 2339.2 2223.2 926.1
7 2700 38.66 213.02 2417.9 2301.9 987.7
7 2800 39.37 213.27 2495.6 2379.6 1050.5
7 2900 40.50 213.52 2572.3 2456.3 1114.6
CLOSURE
DISTNCE AZIMUTH
7 3000 40.33 213.69 2648.4 2532.4 1179.2
7 3100 40.05 213.03 2724.8 2608.8 1243.6
7 3200 40.20 212.13 2801.2 2685.2 1308.0
7 3300 39.14 211.60 2878.2 2762.2 1371.8
7 3400 38.95 211.81 2955.9 2839.9 1434.7
574.2
634 .4
694.5
754.3
813.3
7 3500 37.83 211.85 3034.2 2918.2 1496.8
7 3600 37.77 212.23 3113.3 2997.3 1558.0
7 3700 37.27 212.04 3192.6 3076.6 1618.9
7 3800 36.83 211.70 3272.4 3156.4 1679.1
7 3900 37.68 211.17 3352.0 3236.0 1739.6
703.7 S 515.0 W 872.0
753.8 S 548.0 W 931.9
805.3 S 581.8 W 993.5
858.0 S 616.2 W 1056.4
911.6 S 651.6 W 1120.5
7 4000 37.92 210.31 3431.0 3315.0 1800.9
7 4100 38.25 210.16 3509.7 3393.7 1862.5
7 4200 38.91 210.82 3587.9 3471.9 1924.9
7 4300 38.63 210.99 3665.9 3549.9 1987.5
7 4400 38.38 210.79 3744.1 3628.1 2049.7
965.6 S 687.5 W 1185.3
1019.5 S 722.9 W 1249.8
1073.8 S 757.7 W 1314.2
1128.0 S 791.4 W 1377.9
1181.6 S 824.5 W 1440.8
7 4500 38.17 211.06 3822.6 3706.6 2111.7
7 4600 38.21 211.03 3901.2 3785.2 2173.5
7 4700 38.13 211.35 3979.8 3863.8 2235.3
1234.4 S 857.2 W 1502.9
1286.4 S 889.7 W 1564.1
1337.9 S 922.1 W 1624.9
1389.1 S 954.0 W 1685.1
1440.7 S 985.5 W 1745.6
^Station Types: 7/GYRO
***Grid and magnetic corrections have been applied to
{hr (," ).~1~ ~ .~9 ~
these
1493.4 S 1016.8 W 1806.7
1546.7 S 1047.9 W 1868.3
1600.4 S 1079.5 W 1930.5
1654.2 S 1111.7 W 1993.0
1707.6 S 1143.7 W 2055.2
1760.7 S 1175.5 W 2117.1
1813.7 S 1207.4 W 2178.8
1866.6 S 1239.4 W 2240.6
surveys***
217.27
217.04
216.82
216.60
216.39
216.20
216.02
215.85
215.69
215.56
215.45
215.34
215.21
215.05
214.90
214.78
214.67
214.58
214.48
214.37
214 .25
214. 12
214.00
213.90
213.81
213.73
213.65
213.58
DL
/loo
0.87
0.25
0.51
0.30
1.26
0.6~
1.19
1.21
0.73
1.14
0.20
0.51
0.60
1.11
0.24
1.12
0.24
0.52
0.419[
0 9
0.58
0.34
0.78
0.30
0.28
0.27
0.04
0.21
22-14LS
RECORD OF SURVEY
-m
MEAS INCLN DIRECTION VERTICAL-DEPTHS SECTION
DEPTH ANGLE AZIMUTH BKB SUB-SEA DISTNCE
RELATIVE-COORDINATES
FROM-WELL-HEAD
4800 37.78 210.67 4058.7 3942.7 2296.7 1919.3 S 1271.1
4900 37.58 210.23 4137.8 4021.8 2357.9 1972.0 S 1302.1
5000 36.98 210.12 4217.4 4101.4 2418.4 2024.4 S 1332.5
5i00 36.98 210.73 4297.3 41,81.3 2478..6 2076.2 S 1363.0
5200 37.01 210.44 4377.1 4261.1 2538.7 2128.0 S 1393.6
5300 37.11 210.32 4456.9 4340.9 2599.0 2180.0 S 1424.1 W
5400 38.14 210.42 4536.1 4420.1 2660.0 2232.7 S 1454.9 W
5500 38.26 210.57 4614.7 4498.7 2721.9 2286.0 S 1486.3 W
5600 38.11 210.65 4693.3 4577.3 2783.7 2339.2 S 1517.8 W
5700 37.91 210.61 4772~1 4656.1 2845.2 2392.2 S 1549..2 W
5800 37.58 2T0.39 4851.2 4735.2 2906.5 2444.9 S 1580.2 W
5900 37.11 210.38 4930.7 4814.7 2967.1 2497.2 S 1610.9 W
6000 36.81 210.40 5010.6 4894.6 3027.2 2549.1 S 1641.3 W
6100 36.75 210.20 5090.7 4974.7 3087.1 2600.8 S 1671.5 W
6200 37.15 210.60 5170.6 5054.6 3147.2 2652.6 S 1702.0 W
6300 37.33 210.75 5250.2 5134.2 3207.7 2704.7 S 1732.8 W
6400 37.31 211.38 5329.7 5213.7 3268.3 2756.6 S 1764.1 W
6500 36.36 214.24 5409.8 5293.8 3328.2 2807.0 S 1796.6 W
6600 35.07 219.11 5491.0 5375.0 3386.1 2853.8 S 1831.4 W
6700 34.64 222.26 5573.1 5457.1 3442.1 2897.1 S 1868.6 W
6800 34.81 223.22 5655.3 5539.3 3497.6 2939.0 S 1907.3 W
6900 35.56 223.05 5737.0 5621.0 3553.6 2981.0 S 1946.7 W
7000 35.93 223.06 5818.1 5702.1 3610.5 3023.7 S 1986.6 W
7100 36.23 222.83 5899.0 5783.0 3667.8 3066.8 S 2026.7 W
7200 36.47 222.80 5979.5 5863.5 3725.5 3110.3 S 2067.0 W
7300 36.54 223.17 6059.9 5943.9 3783.4 3153.8 S 2107.5.W
/400 36.84 223.44 6140.1 6024.1 3841.4 3197.3 S 2148.5 W
7500 37.21 223.83 6219.9 6103.9 3899.8 3240.9 S 2190.i W
Station Types: 7/GYRO
',,~*Grid and magnetic corrections have been applied to these surveys***
(Anadril (c)94 A2214LSD B1.52 12:38 PM 2)
Page 3 07/01/94
CLOSURE
DISTNCE AZIMUTH
2302.0 213.52
2363.1 213.44
2423.5 213.35
2483.6 213.28
2543.7 213.22
2603.9 213.15
2664.9 213.09
2726.7 213.03
2788.4 212.98
2850.0 212.93
2911.1 212.88
2971.7 212.83
3031.8 212.78
3091.6 212.73
3151.7 212.68
3212.2 212.65
3272.8 212.62
3332.7 212.62
3390.9 212.69
3447.5 212.82
3503.6 212.98
3560.4 213.15
3617.9 213.30
3676.0 213.46
3734.5 213.61
3793.~ 213.75
3852.1 213.90
3911.5 214.05
DL
/lOO
0.54
0.34
0.60
0.36
0,18
1.03
0.15
0.15
0.21
0,36
0.47
0.31
0.13
· 0.47
0.20
0 .'38
1.96
3.."
0.58
0.76
0.36
0.33
0.24
0.23
0.34
0.43
A22-14LS Page 4 07/01/94
S MEAS INCLN DIRECTION
C DEPTH ANGLE AZIMUTH
7 7600 37.12 223.70
7 7700 36.75 224.00
7 7800 36.89 224.91
7 7900 36.67 224.13
7 8000 35.18 223.09
7 8100 33.5
7 8200 32.0
7 8300 31.0
7 8400 29.2
7 8500 26.5
RECORD OF SURVEY
7 8600 23.9
7 8700 21.7
7 8800 19.5
7 8900 17.3
7 9000 15.2
VERTICAL-DEPTHS
BKB SUB-SEA
7 9100 13.1
7 9200 11.8
7 9300 10.9
7 9400 9.2
7 9500 8.0
7 9600 8.5
7 9700 8.8
7 9800 10.3
7 9900 12.2
7 10000 14.8
7 10100 16.5
7 10200 17.2
N 1023U 17.6
^Station Types:
***Grid and
SECTION
DISTNCE
6299.6 6183.6 3958.4
6379.5 6263.5 4016.7
6459.6 6343.6 4074.6
6539.7 6423.7 4132.5
6620.7 6504.7 4189.4
4 224.16 6703.2 6587.2 4244.2
8 224.70 6787.2 6671.2 4296.6
9 225.08 6872.4 6756.4 4347.1
5 225.42 6958.9 6842.9 4395.5
1 226.47 7047.3 6931.3 4440.4
3 228.21 7137.7 7021.7 4480.9
1 228.72 7229.9 7113.9 4517.7
3 227.96 7323.5 7207.5 4551.0
8 225.72 7418.3 7302.3 4581.2
9 220.47 7514.3 7398.3 4608.5
RELATIVE-COORDINATES
FROM-WELL-HEAD
3284.5 S
3327.8 S
3370.6 S
3413 . 3 S
3455.8 S
2231.9 W
2273.5 W
2315.5 W
2357.4 W
2397.9 W
2436.8 W
2474.8 W
2511.7 W
2547.4 W
2581.0 W
3496.6 S
3535.3 S
3572.4 S
3607.8 S
3640.4 S
3669.2 S 2612.3 W
3695.0 S 2641.3 W
3718.4 S 2667.6 W
3740.0 S 2690.8 W
3760.4 S 2710.0 W
7 215.27 7611.2 7495.2 4632.8
8 207.41 7708.9 7592.9 4654.4
5 201.29 7806.9 7690.9 4674.1
1 190.65 7905.3 7789.3 4691.1
4 178.33 8004.2 7888.2 4704.6
3779.8 S 2725.1 W
3798.2 S 2736.5 W
3816.2 S 2744.6 W
3832.9 S 2749.6 W
3847.8 S 2750.8 W
2 164.83 8103.2 7987.2 4715.9
9 142.58 8202.1 8086.1 4724.1
4 123.48 8300.7 8184.7 4727.7
3 113.81 8398.8 8282.8 4727.3
3 107.53 8496.0 8380.0 4723.5
3861.9 S 2748.7 W
3875.2 S 2742.1 W
3886.3 S' 2729.9 W
3895.5 S 2712.7 W
3903.7 S 2690.8 W
3911.3 S 2664.9 W
3918.9 S 2636.8 W
3921.3 S 2628.1 W
3 105.27 8592.3 8476.3 4717.3
8 105.20 8687.9 8571.9 4710.1
9 105.24 8716.5 8600.5 4707.8
7/GYRO N/INTERPOLATED
netic corrections have been applied to these surveys***
CLOSURE
DISTNCE AZIMUTH
3971.0 214.20
4030.3 214.34
4089.3 214.49
4148.3 214.63
4206.2 214.76
4262.0 214.87
4315.4 214.99
4367.0 215.11
4416.5 215.23
4462.5 215.34
DL
/lOO
0.12
0.41
0.56
0.52
1.61(~
1.74
1.49
1.01
1.84
2.79
4504.2 215.45 2.68
4542.0 215.56 2.22
4576.3 215.66 2.20
4607.4 215.73 2.26
4635.2 215.78 2.56
4659.7 215.79
4681.3 215.77
4700.7 215.72
4717.1 215.65
4729.9 215.56
4740.2 215.44
4747.2 215.28
4749.3 215.09
4747.0 214.85
4741.2 214.58
4732.8 214.27
4723.4 213.93
472u.5 213.83
2.47
2.13
1.53
2.18
2.00
3.37
3 .49
2.67
2.98
1.81
0.75
1.34
~22-14LS
RECORD OF SURVEY
MEAS
DEPTH
INCLN DIRECTION VERTICAL-DEPTHS SECTION
ANGLE AZIMUTH' BKB SUB-SEA DISTNCE
10259 19.20 113.3'0 8744.1 8628.1 4706.2
10315 22.90 125.50 8796,3 8680.3 4706.3
10419 31.10 140.20 8889.0 8773.0 4717.8
10494 36.80 144.90 8951.2 88.35.2 4734,.3
10600 43.80 149.40 9032.0 8916.0 4766.1
RELATIVE-COORDINATES
FROM-WELL-HEAD
Page 5 07/01/94
10674 48.31 151.21 9083.4 8967.4 4793.3
10687 49.10 151.50 9092.0 8976.0 4798.4
10781 55.50 152.90 9149.4 9033.4 4838.5
L0878 59.40 157.80 9201.6 9085.6 4886.2
.i. 0976 62.10 162.70 9249.5 9133.5 4941.9
CLOSURE
DISTNCE AZ
]1.080 64.20 1~1.20 9296.6 9180.6 5010.1
11174 61.46 177.69 9339.5 9223.5 5078.3
].1191 61.00 178.90 9347.7 9231.7 5091.1
11196 61.06 179.08 9350.1 9234.1 5094.8
11271 62.00 181.70 9385.9 9269.9 5152.3
3924.3 S 2619.5 W 4718.2
3934.3 S 2602.1 W 4717.0
3966.8 S 2568.4 W 4725.7
4000.1 S 2543.0 W 4740.0
4057.7 S 2506.1 W 4769.2
11349 62.40 186.60 9422.3 9306.3 5214.6
11428 64.90 192.10 9457.4 9341.4 5281.0
11519 66.50 200.70 9494.9 9378.9 5361.6
11600 65.40 205.60 9527.9 9411.9 5435.1
11675 65.00 209.10 9559.4 9443.4 5503.1
4104.0 S 2479.7 W 4794.9
4112.5 S 2475.0 W 4799.9
4178.3 S 2440.4 W 4838.8
4252.6 S 2406.4 W 4886.2
4333.1 S 2377.5 W 4942.5
1.1691 64.85 210.28 9566.1 9450.1 5517.6
11748 64.40 214.50 9590.6 9474.6 5569.0
11819 64.40 220.40 9621.3 9505.3 5632.4
].1900 66.70 227.00 9654.8 9538.8 5703.9
i2023 69.60 228.10 9700.6 9584.6 5812.5
4423.3 S 2356.7 W 5012.0
4506.5 S 2348.5 W 5081.7
4521.4 S 2348.1 W 5094.8
4525.8 S 2348.0 W 5098.6
4591.7 S 2348.5 W 5157.4
4660.5 S 2353.5 W 5221.0
4730.3 S 2365.0 W 5288.5
4809.7 S 2388.4 W 5370.1
4877.7 S 2417.5 W 5443.9
4938.2 S 2448.7 W 5512.0
4950.8 S 2455.9 W 5526.4
4994.2 S 2483.5 W 5577.7
5045.0 S 2522.4 W 5640.5
5098.3 S 2573.3 W 5710.9
5175.3 S 2657.6 W 5817.8
]2073 71.00 228.40 9717.4 9601.4 5857.1 5206.7 S
12121 72.30 228.10 9732.6 9616.6 5900.3 5237.0 S
12166 73.60 227.40 9745.8 9629.8 5941.1 5265.9 S
2692.7 W
2726.7 W
2758.5 W
,ration Types: 3/MWD N/INTERPOLATED
~**Grid and magnetic corrections have been applied to these surveys***
IMUTH /100
213.72 10.22
213.48 10.21
212.92 10.11
212.45 8.36
211.70 7.~
211.14 6.34
211.04 6.34
210.29 6.91
209.50 5.85
208.75 5.16
208.05 7.56
207.53 6.80
207.44 6.80
207.42 3.32
207.09 3.32
206.79 5.58
206.56 6 ..99
206.41 8.7q
206.36 5.
206.38 4.2'7
5861~7.
5904.3
5944.7
206.38 6.74
206.44 6.74
206.56 7.49
206.78 7.94
207.18 2.50
207.35 2.86
207.50 2.77
207.65 3.25
(At,.,~lT'i] (r')')4 A22141,.NF) 1~1.",2 ]2:'~,t{ I'M 2)
t22-14LS Page 6 07/01/94
RECORD OF SURVEY
MEAS INCLN
DEPTH ANGLE
12213 74.40
12307 76.80
12355 78.00
12880 78.00
DIRECTION VERTICAL-DEPTHS SECTION
AZIMUTH BKB SUB-SEA DISTNCE
RELATIVE-COORDINATES
FROM-WELL-HEAD
227.40 9758.7 9642.7 5984.2 5296.5 S 2791.8 W
226.70 9782.1 9666.1 6071.0 5358.5 S 2858.4 W
226.70 9792.6 9676.6 6115.8 5390.7 S 2892.5 W
226.70 9901.7 9785.7 6606.7 5742.9 S 3266.2 W
'Station Types: 3/MWD X/EXTRAPOLATED
~**Grid and magnetic corrections have been applied to these surveys***
CLOSURE
DISTNCE AZIMUTH
5987.2 207.79
6073.3 208.08
6117.7 208.22
6606.7 209.63
DL
/ oo
1.70
2.65
2.50
0.00
L.
'"SHELL
V~ESTERN E g
P iNC
A22-:[4LS
VERT I CAL SE C T I ON
Section at: 209.63
TVD Scale.: 1 inch = 1200 feet
Dep Scale.: ~ inch = ~200 feet
Drawn ..... : 07/01/94
VIEW
Anadri l ] Schlumberger
Marker Identification MD BKB SECTN INCLN
Al KB 0 0 0 0.00
B) TD t2880 gg02 6607 78.00
B
10800
0 600 1200 1800
2400 3000 3600 4200 4800
Section Departure
,,
~nadril! {c)93 A2214LSD 81.52 12:48 PM 2]
5400 6000 6600 7200 780~
SHELL-..~ESTERN
Marker Identification MD N/S
A) KB 0 0
8} TD i2880 5743
E/W
3266
E & -P,.ZNC
SCALE ·
DRAWN ·
A22-14LS
PLAN VIEW
CLOSURE · 6607 feet at Azimuth 209.63
DECLINATION.' 22.500 E
1 inch : 900 feet
07/0t/94
·
Xnadrj ]] Schlumberger
5850 5400 4950 4500 4050 360n 3i50 2700 2250 1800 '~350 )00 450 0 450
. <- WEST ' EAST ->
~ (Anadrill (f. .'714LSI] 81.52 12. ~.?, '~N ,'.:
June 30, 1994
Shell Western E&P Inc.
An affaliate of Shell Oil Company
P. O. Box 576
Houston, TX 77001
Mr. Larry Grant
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Grant:
SUBJECT:
FORMATION TOPS PICKS FOR THE SWEPI MGS A-22-14LS,
MIDDLE GROUND SHOAL FIELD, KENAI BOROUGH, ALASKA
Here is a list of formation tops encountered in the SWEPI MGS A-22-14LS (APl# 50-733-10085-62), as
required by the AOGCC. Please note that this well was drilled through the overturned limb of the Middle
Ground Shoal anticline, so the Hemlock formation tops were encountered in reverse order.
KB = 116'
Approximate
Formation Top MD TVD Subsea
HD (normal) 10,365' 8,840' -8,724'
HE 10,480' 8,939' -8,823'
HF 10,522' 8,972' -8,856'
HI 10,607' 9,036' -8,920'
IlK 10,660' 9,073' -8,957'
HN 10,883' 9,203' -9,087'
HR 11,173' 9,338' -9,222'
HR (overturned) 11,785' 9,605' -9,489'
HN 12,132' 9,733' -9,617'
IlK 12,442' 9,819' -9,703'
HI 12,505' 9,836' -9,720'
I-IF 12,620' 9,867' -9,751'
HE 12,700' 9,889' -9,773'
HD 12,760' 9,905' -9,789'
HC 12,870' 9,935' -9,819'
TD 12,880' 9,937' -9,821'
If you have any questions, I can be reached at (713) 544-2389.
Very truly yours,
Maria A. Balzarini
Senior Geologist
RECEIVED
Alaska 0il & ~;as Cons. Cornmissiort
A~chorage
June 30, 1994
Shell Western E&P Inc.
An affiliat~ of 8hdl O~ Company
P. O. Box 576
Houston, TX 77001
Mr. Larry Grant
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Grant:
SUBJECT:
LOG DATA FROM SWEPI MGS A-22-14LS, MIDDLE GROUND
SHOAL FIELD, COOK INLET, ALASKA
Enclosed please find the following log data from the SWEPI MGS A-22-14LS well in
Middle Ground Shoal Field, Kenai Borough, Alaska (API# 50-733-10085-62):
BLP Phasor Induction - Gamma Ray log
BLP Compensated Neutron - Lithodensity log
Sepia Phasor Induction - Gamma Ray log
Sepia Compensated Neutron- Lithodensity log
LIS Tape of DITE/LDT/CNL/GR
DITE/LDT/CNL/GR tape listing
List of Formation Tops
Please sign one copy of this letter and return to me at the above address.
Very truly yours,
Maria A. Balzarini
Senior Geologist
RECEIVED
Alaska Oil & Gas Cons. CornrniS~[Q~,
Anchorage
Date:
MEMORANDbM
State or Alaska
Alaska Oil and Gas Conservation Commission
TO: .
THRU:
FROM:
David Johnst~
Chairma~
Blair Wondzell,
P. I. Supervisor
~L~'~'u Grimaldi,
Petroleum Inspector
DATE: June 15, 1994
FILE NO:
SUBJECT:
AV3JFOBD.DOC
BOP Test Shell "A" rig
Shell well # A22-14 LS
Middle~ Shoal Field
Tuesday. June 14,.1994: I traveled to Shells "A" platform in the Middle Ground Shoal
field of Cook Inlet to witness the weekly BOP test on their rig.
Wednesday, June i15, 19.94: The test was started this morning and went very well. All
components were subjected to a proper function test and a Iow/high test of 250/5000
PSI. Jerome Dodge (Inlet Drilling Toolpusher) did a outstanding job of insuring a proper
BOP test was accomplished, this included testing the variable rams and annular
preventer with both sizes of their tapered string. There were no failures observed.
Summary: I witnessed the weekly BOP test on Shells "A" platform. Test time 2.5
hours, no failures.
Attachment: AV3JFOBD.XLS
cc: Gary Blackburn (Area Manager)
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X
Drlg Contractor: Inlet Ddlling
Operator: SWEPI
Well Name: A 22-41 LS
Casing Size:
Test: Initial
Workover: DATE: 6/15/94
Rig No. "A" PTD # 94-71 Rig Ph.# 776-5241
Rep.: R. V. Wells
Rig Rep.: Jerome Dodge
Set ~ Location: Sec. 11 T. 8N R. 13W Meridian Seward
Weekly X Other
TEST DATA
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
Reserve Pit N/A I
Well Sign OK
Drl. Rig OK
BOP STACK: Quan.
Annular Preventer 1
Pipe Rams
Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves 1
Check Valve
Test
Pressure P/F
250/3500 P
I 250/5000 P
N/A 250/5000 N/A
I 250/5000 P
I 250/5000 P
I 250/5000 P
250~5000
P 250/5000
P
MUD SYSTEM: Visual
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Gas Detectors P
Alarm
P
P
P
P
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Test
Quan. Pressure P/F
I 250~5000 P
I 25015000 P
2 250~5000 P
2 250/5000 P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
11
Test
Pressure P/F
250/5000 P
38 250/5000 P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: Four Bottles
2600 Average
2,900 ! P
1,650 P
minutes sec.
minutes 53 sec.
Remote: X
Psig.
Number of Failures:
TEST RESULTS
0 ,Test Time: 2 1/2 Hours. Number of valves tested
24 Repair or Replacement of Failed"
Equipment will be made within N/A days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Outstanding test, Good test procedure.
Distribution:
orig-Well File
c- Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
FI-021L (Rev. 2/93)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
AV3JFOBD.XLS
Louis R Grimaldi
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
May 13, 1994
A. J. Durrani
Tech Mgr - Asset Admin
Shell Western E&P Inc.
P O Box 576
Houston, TX 77001
Re:
Middle Ground Shoal A22-14LS
Shell Western E&P Inc.
Permit No. 94-71
Sur. Loc. Platf A, Leg 1, Cond 6, 1622' N & 437' W fr SE Crn
Sec. 11, T8N, R13W, SM
Btmnhole Loc. 13076'MD, 4199' S & 3777' W of SE Crn, 10016'TVD
Sec 11
Dear Mr. Durrani:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission at 279-1433.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA C.'""'" AND GAS CONSERVATION CC'-~VIISSION
PERMIT TO DRILL'
2O AAC 25.005
la. Type of work Drill [] Redrill [Z]! lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil
Re-Entry E] Deepenq Service [] Developement Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
SHELL WESTERN' E&P INC. 116' KB feet
3. Address 77001 6.P_roP,~'t~_~_Oesignati°n "G" POOL
P. O. BOX 576 (WCK 5237), HOUSTON., TX ~, ADL 18756
4. Location of well at surface PLATF A, LEG 1, C.0~D 6 7. Unit or property Name 11. Type Bondcsee'2oAxc25.0251
top of productive interval 8. Well nurpber Number
10,230~.HD., 2299' S & 3065' W-OF .SE CORNER .A22-14LS 400 HM 7522
~,~t(~' d~ 'SEC. 11 9. Approximate spud date Amount
1~.,,,~, ,.,~,,!. 4.199' S & 377.7' W OF SE CORNER
]n:nl6' TVn _~F£. ]] June 1, 19'94 $200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed,d(~P~th(Mo,,~ rvm
property line 13,076 MD
4436 feet 600 feet 3746 10,016' TVD feet
16. To be"completed for deviated wells 17. Anticipated pressure ~,,, 2o ^^c 25.035
Kickoff depth 10.23 0 feet Maximum hole angle 72 0 Maximum surface 918 ..,~ ^, ,o,.,.o,. ¢vo~ 4557
18. Casing f~rogram Setting Depth
size Specifications "Top Bottom Quantity of cement
H'01e Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
6" 4-'1/2" 11.6# K-55 BTC 2896' .10:,180 8669' 13,076' 10~016 N/A (SLOTTED LNR)
19. To be completed for Redrill, Re-entry, and Deepen dPerations. REF. WELL NO. A22-14, API# 50-733-10085-0101
Present well condition summary
Total depth: measured 11,532 feet Plugs (measured)
true vertical 9905 feet
Effective depth: measured 11,444 feet Junk (measured) K
true vertical 9829 feet
Casing Length Size Cemented Mea~ ~i~J994 True Vertical depth
Structural Alaska Oil & Gas Cons. Commission
Conductor Anchorage
Surface 1997' 13-3/8" 1100 SX 1997' 1855'
Intermediate 7737' 9-5/8" 700 SX 7737' 6409'
Production 4108' 7" 1500 SX 7424- 11,532' 6159- 9905'
Liner
Perforation depth: measured 10,224' - 11,254'
true vertical 8711' - 9662'
20. Attachments Filin_,.g fee iX']. Property plat [~ BOP Sketch ~ Diverter Sketch [] Drilling program [~'
Drilling fluid program L~ Time Ys depth plot [] Refraction analysis ~ Seabed report [] 20 AAC 25.050 requirements
21. I hereby certify that the foregoing is true a'nd correct to the best of my knowledge
Signed ¢.[~O.~.~.. L.~.~.,, ~ A.. J. DURRANI Title TECH. MGR. - ASSET /~.DrlIN. DateS/3/94
' // ' Commission Use Only
Permit Number I APlnumber ' I Appr.o...valdate ISeecoverletter
~'_ 7/,/ 50-- 7.~',~-//'c:~4:::~ <~>',.,4'-' ~'~ ,~ /,.,~ , ~' ~;/ for other requirements
, ,
Conditions of approval Samples required [] Yes ;~ No Mud log required ~ Yes /1~ No
Hydrogen sulfide measures E] Yes ,,~ No Directional survey required /~ Yes [] No
Required working pressure for BOPE 02M; ~ 3M; ~ 5M; E] 1OM; ~ 15M
Other: Original Signed By by order of
Approved by David W. Johnston Commissioner the commission Date .~-/~-~/
Form 10-401 Rev. 12-1-85 - Submit in triolicate
MIDDLE GROUND SHOAL WELL NOo A22-14LS
WELL PROGRAM
Middle Ground Shoal (MGS) A22-14LS will be a redrill of
existing well A22-14. The objective is the Hemlock reservoir in
the West Flank of the field.
The well will be drilled directional out of the 7" liner, through
the Hemlock to a TVD of 10,016'. The well will be completed with
a 4 1/2" slotted liner across the Hemlock reservoir.
The existing perforations will be left open. A retrievable
whipstock used for directional kickoff will be set above the
existing perforations. The whipstock equipment is set up such
that the whipstock can be produced through from the lower
intervals.
R£ £1VED
MA y _ 4 1994
,~laska Oil & Gas Cons. Commission
AnChorage
WELL:
LOCATION:
OBJECTIVE:
EVALUATION
A22-14LS
PLATFORM A, LEG 1, CONDUCTOR 6
1,622' FSL 437' FEL Sll TOBN R13W SM
HEMLOCK
GEOLOGY
SUMMARY OF PROPOSAL
FIELD:
KB:
MIDDLE GROUND SHOAL
116'
DRILLING
LOGS
DRILLPIPE
CONVEYED
LOGS
AMS
GR
CNL
LDT
DITE
MUD SIGNIFICANT
LOGGERS FORMATIONS
III
II
-~1
I
I
I
MUDLOGGERS
FROM KOP
TO TD
HEMLOCK HC
HEMLOCK HR
h
--'1
I
I
1
h
HEMLOCK HR2
HEMLOCK HN2
HEMLOCK HK2
HEMLOCK HI2
HEMLOCK HF2
HEMLOCK HE2
HEMLOCK HD2
HEMLOCK HC2
TD
MD
(TVD)
Ill
II
325 ' I I_
I
I
1,997' L
(1,855')
7,424'
(6,159')
10,180'
(8,669')
o~s. Comm'mkion
13,076' L
(10,016')
HOLE
SIZE
6mI
HOLE
CASING
MUD DIRECTIONAL
PROGRAM PROGRAM
20"
13 3/8"
9 5/8"
7,1
KOP
@
10,230'
ANGLE
BUILD
&
TURN
TO
72 DEG
S46W
4 1/2"
SLOTTED
LINER
MINERAL
OIL
BASE
MUD
EXPECTED
MUD
WEIGHT
9.4 PPG
DESCRIPTION SUMMARY OF PROPOSAL
MIDDLE GROUND SHOAL
A22-14LS
1. Move to A22-14 (leg 1, conductor 6) and rig up.
2. Nipple up 5,000 psi. BOP stack and test.
3. Pull tubing and packer.
4 ' GIH with 6" bit and scraper and clean out to TD. Displace
to mud system.
5. Set whipstock at 10,230'MD and sidetrack. (Equipment will
be set up to produce existing perforation production
through whipstock.)
6. Directional drill to 13,076'MD-KB using a 6" hole.
7. Log.
8. Run a 4 1/2" slotted liner and hang off at 10,180'MD.
9. Run a packer and tubing. (Packer at approximately
10,000'MD.) Nipple down well.
MIDDLE GROUND SHOAL A22-14LS
DRILLING FLUID PROGRAM
The 6" hole will be drilled using a mineral oil base mud. The
anticipated mud weight is 9.4 ppg.
EXPECTED PRESSURES
The expected pressure gradient is 0.455 ~si/ft. The expected
maximum bottom hole pressure is 4,557 psi at 10,016'TVD.
The expected maximum surface pressure with an oil fluid column
and the well shut in is 918 psi.
CASING PROGRAM
A 6" hole will be drilled out of the existing 7" liner to TD. A
4 1/2" ll.6#/ft K55 BTC slotted liner will be run to TD and hung
at 10,180'MD. The slots wil be 0.03" in width° No cementing
operations are planned.
RECEIVED
MAY -4 1994
Alaska Uil & Gas Cons. Commission
Anchorage
~ Anadril 1 Schlu.~berge r
~ Alaska Diszric
~ ~ ~. 1111 East 80th Avenue
~ ~ ~ Anchorage AK 99518
~ ~ ~ {907) 349-4511 F~x 349-2487
~ ~ DIRECTIONAL WELL PLAN for SHELL WESTERN E & P INC
Well ......... : A22-14LS Pl) ~'
Field ........ : MIDDLE GR(-UND S~AL
Computation..: MINI~4UM CI~VATU~E
Units ...... ..: FEET
Surface Lat..: 60.79577560 N
Surface Long.: 151.49590246 W
LOCATIONS - ALASKA Zone: 4
Legal D~scription X-Coord Y-Co.rd
Surface ...... : 1622 FSL 437. FEL Sll T08N R13W SM 239-779.74 248583:.99
Tie-in/KOP...: 2980 FSL 2067 FEL S14 T08N R13W SM 230063.00 248197:.71
Target ....... : 1080 I~SL 2780 FSL S14 T08N R13W SM 229308.28 248009,-.66
BHL .......... : 1080 FSL 3780 F~L S14 T08N R13W SM 229308.28 248009~ .66
PROPOSED WELL PROFILE
Prepared ..... : 04/22/94
Section at...: 226.35
KB elevaDion.: 116.00 ft
Magnetic Dcln: 22.500 ~
Scale Factor.: 0.99998~25
Convergence..: -1.3058'
STATION
IDENTIFICATION
TIE-IN/KOP 7.5/100
~,~EA~ INELN DIRECTION VERT-DEPTHS SECT RE~J~TIVE-COORDINATES
DEPIH AN~LE AZIMUTH BKB SUB - S DIST fROM- THE- WELLHEAD
10230 17.69
103D0 23.98
104D0 25.76
105D0 35.19
10630 39.96
STATE- PLAN: TOOL DL/
X Y FACE 10
105.24 8717 8601 4608 3~.21.26 S 2628.12 W 230063.00 2481.~79.71 57R <TIE
117.63 8783 8667 4599 3!29.87 S 2606.74 W 230084.17 2481.=70.61 45R 7.50
129.56 8874 8758 4590 3.~52.55 S 2573.47 W 230116.91 2481-~47.18 35R 7 ¢0
137.33 8961 8845 4588 3.~87.06 S 2537.59. W 230152.07 2481.~11. 86 28R
142.77 9041 8925 4592 4(32.82 S 9-499.48 W 230189.05 2481~65.24 23R 7,50
107D0 45.92
10830 5~. 00
109] 0 6l. 14
END OF 7.5/100 CRV~i 109~1 65.51
START 7.5/100 CRV#2 109~4 65.51
146.85 9114 8998 4602 4~89.05 S 2460.03 W 230227.22 2481~08.14 20R 7.50
150.08 9177 9061 4619 4]54.77 S 2419.82 W 230265.92 2481~41.51 18R 7.50
152.77 9231 9115 4641 4.~28.87 S 2379.55 N 230304.48 2481~66.51 17R 7.50
154.23 9258 9142 4657 4~-77.~7 S 2355.34 W 230327.58 248t~17.38 7.50
].54.23 9259 9143 4658 4~9.91 S 2354.16 W 230328.70 2481~14.91 101R 0.00
110)0 65.04
111)0 6[.05
11210 6~.53
11300 6~.50
157.18 9274 9158 4668 4~9.91 S 2340.62 W 230341.56 2481584.61 99R 7.50
165.42 9318 9202 4707 4~5.33 S 2311.68 W 230368.55 2481498.56 96R 7.50
173.76 9362 9246 4756 4~3.46 S 2295.46 W 230382.75 2481410.08 92R 7.50
182.14 9406 9290 4815 ~2.79 S 2292.26 W 230383.92 2481-~-20.70 88R 7.50
A22- 14LS (Pi) 04/22/94 Page 2
PROPOSED $~LL PROFILE
STATION
IDE~TIIFICATION
;4EAS INCLN DIRECTION VERT-DEPTHS SECT RELATIVE-.COORDINATES
DEPTH ANGLE AZIMUTH BKB SUB-S DIST FROM-THE-WELLHEAD
11400 63.96
11500 64.99
11600 66.27
11700 68.06
11800 70.21
STATE-PLA~;E
X Y
TCK)L DL/
FACE 100
·
190.49 9451 9335 4884 4661.81 S 2302.12 I~ 230372.03 2481231.93 85R 7.50
198.74 9494 9378 4960 4748.98 S 2324.87 W 230347.30 2481145.31 81R 7.50
206,84 9535 9419 5044 4832.81 S 2360.13 W 230310.14 2481062.30 78R 7.50
214.74 9574 9458 5132 4911.88 S 2407.29 W 230261.19 2480984.33 75R 7.50
222.43 9610 9494 5225 4984.82 S 2465.55 W 230201.29 2480912.74 72R 7.50
END OF 7.5/100 CRV~2 11852 71.47
TARGET 13076 71.47
TI) 13076 71.47
226.35 9627 9511 5274 5020.00 S 2500.00 W 230166.04 2480878.35
226.35 10016 9900 6434 5821.05 S 3339.74 W 229308.28 2480096.66
226.35 10016 9900 6434 5821.05 S 3539.74 W 229308.28 2480096.66
7 '50
0.00
- SHELb--WESTERN E & P~N~ ........
~, i i ._ ii, . ~! ,,
A22-14LS (P:t)
VERTICAL SECTION VIEW
_ , , . ~ ~ .
' I Section 8(: 226.35
, ~ : TVD Scale.' 1 incl~ = 1200 feet
:
, ...... : _ . 0ap Scale.' 1 5nch = 1200 feet
!,, Oraxn ' 04/22/94
~ ,
; ' Sch]u~b£rger
,, Anad~ J l l
...... ~5 ........ I Narker Identification gO BK8 SECTN INCLN
A) IlE-IN/KOP 7.5/100 10230 8717 4608 17.69
~ B) ENO ~ 7.5/100 CRV~I 10961 9258 ~657 65.51
'" I C) START 7.5/100 CRV~2 1096~ 9259 4658 65.51
j , D) END ~ 7.5/i00 CRV~2 1~852 9627 5274 7t,47
', ~ ~ E) TARGET 13076 10016 6434 71.t7
, J F) TO 13076 10016 6434 71.47
. ,
,,,, ~ ~
_ .. ~.~ . · ...... . ..........
:
....... '"'
I
....... ~ -- .... , .... ~ ......
'
,~ ...... ~ i ~/~~~
.... } .....
-1~00
-600 0 600 1200 J800 2400 3000 3600 4200 4800 5400 6000 6600 7200
Sect ion Departure
.
,~arker Id~n~Jcal~on ~0 N/S
B) ENO OF 7.5/~00 CRV~I 10961 427? 2355
C) START ?.5/~00 CRV~2 log64 4280 2354
O) END OF 7.5/100 CRV~2 11852 5020 2500
E) TARGET ~3076 5821 3340
F) TO t3076 5821 3340
m, j_
S'HELL!--~'ESTERN ' E'"~' p '~NC" ' '".
A22-~4LS (P~)
PLAN ViE~
~ . 1,! ,
CLOSURE · 67~I feel at Azimuth 209.84
DECLINATION · 22.500 E
SCALE ' ~ inch = ~0o0 feet
DRAWN ' 04/22/94
,4nadr'i ll S£hlu~be/"ger'
///
...
~, ~' '
.
6500 6000 5500 5000 4500 4000 3500 3000 2500 2000 ~500 1000 500 0 500
<- ~ST' EAST.->
, ...;~
_ _
-. ~: ..
,
O0 ~'
1000
" LWEEL:'.LOCAT'ON PLAT
..,
: '..i'MIDDLE GROUND SHOAL FIELD
:' A-pLATFORM COOK INLET, ALASKA
'A22-14LS
1622 FSL 4.37 FEL
S."':C 11 TOSN R i3W SFWARD
KBE 116' MSL
14
-~x-~..~ A- 22-1
TIE-IN/KOP
10230 .MD 8717 TVD '~ I '
2980 FSL 3067 FFI ~ l
S14 TOSN R13W SM ' ~ J
I
A22-14LSP / I
~07~ MD 10Ol~ IV~
~O~O FSL 378~ FEL
S14 TOSN R13W SM
/
,-14G
I
/
iI
A-34-14G
¢ - 1 eR 1 ST(;-
A-I'I:~i0! $
/A'c!G
A-?.5-O
,
:~44-u2G
/
I t
t
1RDr. S3
I
-0lC
s~ Gl 708N RlJW
SEV.,/AR!) . M ERID'AN
12
2-12G
A-:5--'20
A-23-12G
"--.,~ A 1 J .. 1ZKUG
A" 13F~10
12
42-14G
I
1
,
~D,-'~ffI,.,I ISd. 000~ .g/g-g!
~DR'~L:I IS~ O00g ..g/g-gl
2NTI dQ 'T'IIS
ii
~ooua ~omH~a ao aot
I
HOVZS ISd 0009 2qOH
,,9
SI-IELL WESTERN E&P INC.
MIDDI_E GROUND SHOAL FIELD
I, 3' 5 KSI LINES
;.;, CIIOSS 3' X 3' X 3' X 3' 5 KSI
CIIOSS 3' X 3' X 3' X 3' X 3" 5 KSI
4. 3' 5 KSI GATE VALVE
5, ADJUSTABLE MANUAL CHOKE - 3' 5 KS/
~ fL---MOTE OPERATED CHOKE o
2-9/16' 10KSI i--/YDFIAULIC ADJUSTABLE,
PI:IESSIJFIE GAGE
]. 4" LINES
]. MI/D/GAS SEPAtlATOFI
3. 6' I. INE
PLATFORM "A"
CHOKE MANIFOLD
INL
VENTED A i- CFIOW
./
Sand Trap
Derrick
Shakers
Derrick
Shakers
1
Mutumps
Shell Western E&P Inc
Platform "A"
Solids Control/Mud System
Desilter 1 6
To De~a
sser
To
To
To Mu~oumps
De~asser
-~=
IDegasser
Mixers
SHELL MINIMUM AUXILIARY EL .PMENTREQUIREMENTS
Master control with Hvdril pressure regulating valve.
.1, unit remote control
Hyclraullc BOP operating unit. See Oelow for detail.
. Kelly cocks [] UDDer ?~ Lower
- Kelly saver sub with Drotector rubber.
Pressure Rat(nd 5,000
~ Ins~cle BOP. surface type. for each size drill pipe.
- Full opening ball valve for each size drill 01De in use.
Labelled crossover suOs for each different connection ~n drill
OPTIONAL AUXl LIARY EQUIPMENT
- - inside BOP - Orop or downnole type. ~.~' Cup or plug type E~OP tester with spare seals.
SHELL MINIMUM HYDRAULIC OPERATING UNIT SPECIFICATIONS
Accumulator volume -- must clehver ].5 times the volume to make position change on all hydraul- ically operated units ancl retain I200 Psi (200 Psi above prechargeI without Dumps.
Pump caOaciw to obtain 200 ps, aoove accumulator precnarge pressure in two (2) amuses or less.
while closing annular preventer and ooenmg choke line valve. See Section 4.31.
Power for pumos -- 2 sourc=s required -- Air-Electric or All Air (rig air plus seoarate air tankl -- 2
' Dumps reau~red.
Lines from operating unit to BOP units
5.000 DS( Minimum Yield '~ Seamless steel lines
.90" minimum i.D. [] Seamless steel lines with Chiksan iD(nfs.
[] Hose per. Section 4.32
Operatincj unit fluids: Hydraulic o,I or soluble oil.
All controls shall be clearly marked to show unit ooerated. Blind Ram control to nave easily removed
latch or c~uard.
Sufficient bottled nitrogen or otl~er back-up storage system to equal accumulator capacity, manifolded
to by-pass accumulator and close BOP directly.
Alarm, or visual indicator to show w~en accumulator is shut off from preventers.
SHELL MINIMUM MUD SYSTEM REQUIREMENTS
Pump stroke counters each Dump.
Deo~asser.
Pit volume recorcler with alarm.
Flow line monitor.
~ OPTIONAL MUD SYSTEM EQUIPMENT
Trip tank (with 6th mini
Flow line gas seoarator.
MISCELLANEOUS EQUIPMENT SPECIFICATIONS ANO INSTALLATION INSTRUCTIONS
1 All connections shill be vv~ded, studded, flanged or Cameron clamp of comoer~Oia rating.
2. All flang(-i shall b~ APl 68 or 68X and ring g~skatl sl31il be APl star4 RX or BX. Do not r~u~ 8X r~n~. Alsys use
3. ~illi~ ;~ll eatl N to~ or for~ i~ ~t~. PiN ~t not
4. ~OP track shall ~ br~ to ~se De tui~le lu~l DY lurn~kl~ lin~
5. All ~[e vll~ Iflall bi ~l~ ~th hl~l. Rims sh~ld h~e ~n~ltv ~t~ ~r~ I~klnq extensions
(e~tend~ b~o~ su~) re~v for u~.
6. For land rl~ the ~st~ Con~r~ $tatson a~ O~ratlng unit shill be I~(~ at gr~ I~ a m~n~mum of 50' from
ment~ tn S~tton 4.32 in the 5hell Well Control ~nual.
7. H~s~ng and hel~i~ Ih~id be pr~;d~ for ~umulltor. bio--ut prwentlfs, choke Nnilold where cona~ttont ~rrant.
~ntr~t~ shill rake no conn~t~on to ~si~ h~ llde ~tletl txc~ by ~de~ of Shell.
9. One s~re Set Of ram bl~ks for the drdl DiN In Uti IhlJl bl keOt on r~.
10. Any m~tegn~nt of r~9 should be c~rK;~ [o IvoId undue ~ of
11. Four way vll~ ~;11 N k~t ~n o; clm~. not in n~tml O~lton.
'Nor &oolicaOle rD welt ~rviciag wlo~our drill ~i~.
4.28.12
SHELL MINIMUM BOP
STACK REQUIREMENTS
Min. Min.
No. Item I.D. Nominal
1 Flowline 7"
._~2_ Fill up Line ...... 2"
3 Drilling Nipple
4 Annular Pr'eventer ..........
.~ Two si~gi; Or"one dual h~/drualically
operated rams
§ Drilling spool with 2" and 3" min.
outlets
7 Gate Valve 3 1/8"
"'§ Gate Valve Power Operated 3. i/8" -
~ 'L'i~e to choke m,~nifold ...... 3"
10 Gate Valve 2-1/16"
1 Check Valve ....... ~. 1 / 16" -
'ii 'Casing Sp6'~l ........
14 Valves Gale 1.13/16"
~5 cOmpoUnd PresSUre"'Gaucje connecioi i,
--
16 Control plucJ or valve ....... 1.13/16"
17 Kill line to rig mud pump manifold 2"
2"x 2" X,2'_' ...............
'NOTE: Additional ~ecilicalions for Ail/Gas Service are given in SI,vii
Well Control Manual, Appendix 618.
A totaling head $13/11 be ptovlclecl on Aif/(;a$ Service
OPTIONAL
~~~1 1 Wear_~llange or bo~e protector
i~- Gate valve __
Line to roadside connection
Rotating blowout preventer
-
2_..~2 [Gate valve power operated
DRAWING & CHECK LIST 104A
SHELL CLASS 5M
SU_I;#ACE INSTALLATIONS NORMAL
AIR/GAS'
FOR AIR/GAS DRILLING
,g ..............
ANNULARPREVENTER
BLIND RAM
PIPE RAM
ALASKA OIL AND GAS
· CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
May 4, 1994
ADMINISTRATIVE APPROVAL NO. 44. F
Re:
The application of Shell Western E&P Inc. to drill, complete and
produce the Middle Ground Shoal No. A22-14LS well in the Middle
Ground Shoal Field.
A. J. Durrani
Technical Manager
Alaska Engineering/Asset Administration
Shell Western E&P Inc.
601 West Fifth Avenue, Suite 800
Anchorage, Alaska 99501
Dear Mr. Durrani:
The referenced application was received on May 4, 1994. The Middle
Ground Shoal No. A22-14LS well is to be drilled to the steeply dipping
west flank of the reservoir. Structural complexities in this portion of
the field require producers to be drilled at less than 80-acre spacing to
insure adequate drainage. The subject well will be the third producer
in the southwest quarter of Section 14, T8N, R13W SM..
The Alaska Oil and Gas Conservation Commission has reviewed the
evidence available and hereby authorizes the drilling, completion and
production of the referenced well pursuant to Rule 6 of Conservation
Order No. 44.
Sincerely,
Russell A. Douglass
Commissioner
BY ORDER OF THE COMMISSION
Shell Western E&P Inc.
An affiliate of Shell Oil Company
P. O. Box 576
Houston, TX 77001
May 3, 1994
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Gentlemen:
SUBJECT:
SUBMISSION OF FORM 10-401 -APPLICATION FOR PERMIT TO
DRILL MIDDLE GROUND SHOAL LATERAL DRAINHOLE
WELL NO. A22-14LS
Enclosed, in triplicate, is the Application For Permit to Drill a lateral drainhole from
Middle Ground Shoal Well No. A22-14 (APl No.10085-01). The lateral drainhole will be
nailqed/r~:l==t~,L-~. Operations are scheduled to begin June 1, 1994.
Note that the lateral will place an additional oil completion in the southwest
governmental quarter section of Section 14, T8N, R13W. SWEPI, hereby, requests a
variance from Rule l(b) of Conservation Order #44 by way of Administrative Approval
(Rule 6).
If you have any questions or wish to discuss, please call Jeff Wahleithner at (713) 544-
3344 or Paul Huckabee (907) 263-9646.
Sincerely,
',~f. J. Durrani
Technical Manager
Alaska Engineering/Asset Administration
Western Asset
RECEIVED
JMW:MB
Enclosures
MAY -4 1994
Alaska 0il & Gas Cons. Commission
Anchorage
MB412301.DOC- 1
WELL PERMIT CHECKLIST
F OG ; [] dev redrll3 serv []
FIELD & POOL
ON/OFF SHORE
ADMINISTRATION
1. Permit fee attached ................... (Y~ N
2. Lease number appropriate ................ ~~ N
3. Unique well name and number .............. N
4. Well located in a defined pool ............. N
5. Well located proper distance from drlg unit boundary.. N
6. Well located proper distance from other wells ..... N
7. Sufficient acreage available in drilling unit ...... r~,Y--~
8. If deviated, is wellbore plat included ........ ~ N
9. Operator only affected party .............. ~ N
10. Operator has appropriate bond in force ......... ~ N
11. Permit can be issuedWithout conservation order .... ~~N _~
12. Permit can be issued without administrative approval..,--~'Y~N~
13. Can permit be approved before 15-day wait ....... ~
N
ENGINEERING
APPR
14. Conductor string provided ................
15. Surface casing protects all known USDWs .........
16. CMT vol adequate to circulate on conductor & surf csg.
17. CMT vol adequate to tie-in long string to surf csg . .
19. Casing designs adequate for C, T, B & permafrost ....
20. Adequate tankage or reserve pit .............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ..........
24. Drilling fluid program schematic & equip list adequate
25. BOPEs adequate .....................
26. BOPE press rating adequate; test to ~C~ pslg.~
27. Choke manifold complies w/API RP-53 (May 84) ......
28. Work will occur without operation shutdown .......
29. Is presence of H2S gas probable .............
GEOLOGY
/
30. Permit can be issued w/o hydrogen sulfide measures .... Y
31. Data presented on potential overpressure zones .....
32. Seismic analysis 9f shallow gas zones ..........
33. Seabed condition survey (if off-shore) ........ /Y N
34. Contact name/phone for weekly progress reports .... /. Y N
[exploratory only]
GEOLOGY:
ENGINEERING: COMMISSION:
BEW DWJ ~
Comments/Instructions:
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
*w** DLIS SCAN
Scan information fr'om - /dev/rmt/tape625~
Well number is - 37
LIS TAPE
File sequence number~ I
Frame information
FRAME ID IIiDEX-'TYPE DIRECTION SPACING INDEX-MIN(FT) FIRST FRAME
TNDEX.-MAX(FT) LAST FRAME
[15,,~,!] BOI~EHOLE DEPTH Increasi~ 66. 1~275.5~ 1
(.lIN) 12671.5~ 4793
Numb<<~:r of Channels 173
CHA~',~HFZ[]}~ UNITS DIMENSION NUMBER OF ELEMENTS
I N
S
MS
S
F/HR
F
LBF
F
IN
IN
F3
F3
V
V
CPS
CPS
CPS
CPS
CPS
CPS
CPS
CPS
CPS .
CPS
C?S
CPS
CPS
CPS
CPS
CPS
CPS
CPS
CPS 1
CPS 1
I
1
1
1
1
1
G/C3 1
G/C3 i
G/.r,,: 3 1
/ ,.,,~ 1
G/C 3 i
G/C3 1
G/C 3 1
V/V 1
t
1
CPS 1
C PS !
1
CPS 1
CPS 1
V/V 1
V/V 1
VlV t
IqMtM I
M f",t t ~4 1
1",'1 ~,'l / PI 1
N H / ;4 1
M M / H 1
H H I :q
N;4 tiq 1
M N ,,"' ;4 1
Ni~I/'~¥] 1
~,I ~,11 :',! 1
~ 7t I ?4 1
I'1 ~,'1 / :,'; 1
I',,'1~,1I:',1 1
M ;,I I :"l !
N Pi / ?4 1
l,'iM / i',I
MH/:4 !
I
1
1
HV
HV 1
MV
NA
MA
MA
Miq/M
1
MA
MA !
MA 1
V 1
V
V i
V 1
· MV 1
MV 1
MV 1 1
DEGF 1
V 1 1
V 1
V 1 1
V 1 1
t 1
1 1
1 I
! 1
1 ].
1 1
1 1
1 1
1 1
I
1 1
1 I
1 1
1 I
1 1
1 1
.11 I
i 1
1 1
!,
MM/H I 1
MH/M 1 1
OHHM 1 1
OHHH 1 1
M,,i ,f~,, 1 1
H H / H I 1
H M / M 1 1
HM /H
0 H H :','; 1 1
i,i M ,/M i ].
0 H M'",i
C, i'-il ~'"::
.
MA ~ i
M V 1 1
MA 1
0 H H ',: ! !
0 H l,'; M ~ 1
DC6- 1
G / C 3 1
GAF ~
GAP i
.,
1
L. gF
0 ',-~ ;',';; ' !
-
Dc'~ F
D C .' ' ~ I
D Z n :: I
,.
1
!
].
1
I
I
TOH , ,f~l 1
548524
LOC-,,
CSU
4,FJ'. 2
T O H
2i JUN 1994 (LST), Nf~r:NN:D'D',~',gO
548524
1
5~-733- 1 ~T85- 62
HGS A-22--] 4LW
HIDDLE GROUND SHOAL
44. N
SHELL WESTERN E & P, INC.
L~.S
F'~ '~3 sequ~-~nce numb~,r
Pa-sine'Let information
STAT PUhlI TUNI VALUE
B LAC
LB/G 9.
B 0 'T' l-I
ATT E
S 15.
1
ALL
32767
F, IEL
F t 27~,~.
F 1 fS254.
1
F 5
I.. S ~-:V :: ['.:,,'::, L, v V 1427. 356
S ::,-', ;.,)V Lilt: ::,,L V V 1373 .¢'27
B [1 r? ¢..: :,J [' A L .:ff
~"1~') E ::.:U FL,%L g/C3 G/C3 ~. 5:
, .., NMIZ 5/t. 39738
UNAL MH/F'i MN.IH !
U fq A L M M / M H N / ?~ ~.;. 3 c, 2371
U N A L ,.. ,.,"* ". (';; D ..... :: ¢:' .6' ~ 497 .,. TM 8
L' N .a, L E~ E t D F G '- ,{:7. '] ! (-;.{' 4
L; ;',[,..% LO E (;; [': < 'i
-:*"~/M Ni']/H i :/5 2;,' ..
;vii ~'. ~ / H N M ..; H
%'//' M ;"~ N .." M fl Z',.
U N A k t, 2~.0' F *:. S 2
U N.,% k .,'.:~. 9'.: ~ s 2 5
U N A L ]...¢~r E 't 566
U r'f A L
U P,~,& L H 0 N E
U K A L 0 ;.~ M M 0 i,.~ M H I
[..( H/'~,L 9EG DEG
U N A L R X (:; T
~ ':: ;":1A L n E M R
U f~,A, t. 3 1
L; N.& L 4 7
U ['{ A L 4 7
U ?(A L H 4 ! 2
L.' ?{ A L
L; 7 A t
;..~ );,?,, L D L ;:' "F
;'< A L R
~..l N A L
L; [',~ A L C fi: ;:' Y
U ?'.:AL GAPI GAP!
L: N,'*, L 'f' E ',"i P
U;';AL DE(,; ~ DEGF 45
U '. A L D E G F D E (:: F 16
1~,: ,.. F' F .
U h .% L 'l' L C
ALLO S _S
AL LO AUTO
U~';AL 7/5?
A: L 0 F F 1 7 1
,':',L L 0 S S
',..: ,'! ~. :":: Z [< H Z I 2'.8'
.....
,. z. ~
.,-
. . ?.
:,: ,, r
. .
.'; .,,
.,ilL:;, L
N.% L
.
,, :.,, ".:
F-:. ! .6
iE! ;'
.
.'. '~: -
"'; '.t :"
~' ' ...~' L
i.~ '
,,-.
. _
,,,~; ', ...
..
. ,-.,
. ',, .
:- , ..-. ,~
....
.
:'i C. X :~ ' x .',. L
'T '.,' .... '.L
'7C "
.~
. ,L
-'/%-
DR~:LL.F::iPE MEASUREMENTS USED FOR DEPTH
BITE --- LBT/CHL RUN IN COMBINATION
i',iO SI:"' F},jr:.}: TO OIL-BASED MUD
~',;0 f.;F:L 9UE TO OIL BASEl:.) MUD
,75' ,S;r,q;',!DOFF.S RUN ON BITE
F HASOR INDUCTION-GR
TLC LOGGING SYSTEM
M G F,
LEG I. CO['.:;~UCTOR
S!-;.-L._ '.~CS'I'EEN E & P, INC.
;'di )": E fiROC~',:L' ..,HOA~
K [-::''
: /
~ ' :.?'.t' ~ / 2.(7
CU:,iI :.7'.'::', 1S9(.
ALASKA
HS L
LL!T/CML
5~'- 733- 1,6N85- 52
it I
I3 b?
/ A
STATE
f r',. C L'
?. 3 ?
F F ! ~
·
F F !, J:' 2
F F
~ F IZ,q,
F F 115.
F F -..'.; '-'.' ",=', r
·., .: . .
F F' - :: ." 7'~"-'
.= F .1. :d 7.':7:'.
LB/F LB/F G f.
F F .... ~ _.
F F
l- .. :~ ,'T'~" .~'¢~'
7 F "'5 :"' "'
L t~/F LB/F ,!.7.
TOH
4.
5
'-.
- ,~
'. ?
F[~."i'~c' '" ',2 ~ :".!~"" ~" 'r' ======== ......
-. ~_:.¢--'?v'?K -;':'.E..TIO;'~ ~PAC!NG !NDEX-HIN(FT) FIRST FRAr4E
i'NOEX-MAX(FT) ~ '"-
..A.-: ~ FRAME
L 8 F
V
V
C PS
CPS:
C P S
C P
C P S:
C F~ fq
C PS
C PS
CPS
C P .:~.
CPS
Cp<,
":
V
V
CPS
....
C P S
C ~ :;
G/C3
G I ~:.' :2
G/C 3
G ./C ~
G /C ~
(.~ lq3
G / C q
V/'
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
!
1
1
1
I
I
1
1
1
1
1
1
1
1
1
I
1
1
1
1
1
1
1
!
1
I
!
1
!
i
!
.I.
!
i
t t
!
!
1
].
I 1
1
I
1
1 1
1
I
1 t
!
.[
1 !
~ I
1 1
1
I !
1 1
PRODUCT CSU
VER:g ~ ON ,¢,9'. 2
F' F!, OGf~ AI4S TOH
Ct:'!. I:!AT ! ::.)[I -T I ME 21 JUN 1994 (LST), ~:~:~,,~
F r iLL [.'i-.~'~,~t4.iE r,:'l): DDLE GROUNB SHOAL
C,'. :i Ail'/ SHELL WESTER~I E & P, INC.
N,?.,?.i !f .,-::.; i" 2~, (: F. V [:', R ~:~ I 0 N
r , ,:-.... ~:;.~ClU~nce number;
U I'!,,:':. L. MAG E
:..' ii,,';:, L B LAC
, ~' ' t. !.. i,~: ,,'cL ri?: / G '.9. ·
~:; ,,"-.L D :[AG
'~.. ~ .:Li L.'".,OT I,~,~
~: i",,."', ! A'['TE
..
!f :,~:, t AL L
· '", L F I E L
,a.i [ ' F' F iff,
..:. ;.; , IF F' .t..fi: 2 ,r,, ~t.
; "" '. i ).6
f.,[, I i"t t- I" "; ~'
...... ,., o
,,'.: i
Z :' ?,: i:: U !: > L ~ H Z K H Z 2.
M 5 E ~ L: :':,:~ L M H / M H H / M .-. :1 9 3,4. Z 8 6 -
~'.!)( :':' L: :..::~L H':,,'lfl HH/'H '- 1:
bit.:, .: L v,>~.L :':;d/M ;,:'< / M
DS:-. ,t Fi:.(/M MM/F: 7 G::~ 7
3 :::: ,,, ; :F / Ft M;:: .,: ~"l ,t [~ S
.... ~ h; ~ L~, ~,~ ~,;
C,i~' ~' ,,:,.L:7..o,,L SSS DEG --2
b, ; L';',:AL :~SG DEG .-.(T..;": > 1393
-': ,' :'" "?:,~:", L S: (": D tZ :: F~. ,~ '~ 1 7 S: ~': '3 B
':'~.: '.: t.;":,:"~L :.' S:T: DES "' ! .: '-"; .'. 1:3
:'::?, ~ /'::/N ~fi~.'.l M 13T..i :':' ,,
FiSL, :,'. :i:'~!H HX/M 3 2 :~/;:.
,'i5-..: i'i~'//M :ii,;/M 68.-~
NGF 4, UHAL ,1. , .0'5 t ! 43
DGcT. UhlAL /~ q9 ;i 0.: ~:~7
D G F: ~ U N A L. ;( . F~/,; ~'I 7/!. 4
D C A :'5; U ~': A L F F 1 .¢ Z 5.4..
,r'"
r) :( C: :' U 5~ A L 4. 7
"~: ~;. O .,, "'; 'P L P HAS
C ?,~ ' :5 L ;",?,, L N P r., I
~':C,) "i' ; h;AL ("Rr'
¢" o m. , - - ~ .
,:...:, ';. ,'~~: ,S L g A r, ~ g A = ! ;i. 6 5
., -. .... ,,,
' ~'~ U ;',:/',, L D ":' 6 ir g :' G F I c, L ,
,, ,. ~, ~,,
'f"~:: ' A~. LO AU'tO
E. C ... A.. L O F F 1 7 ].
'r ~; ,,.~ "r- A L L O S :Si ). F'.
t- 75 7'i ~..; 5: A L .:' ~:'
~ 7..L'" L' 75 A L
,,.,
i. 7/',; '.: L
,
L US. '5 L
T3 L. ('~ C ":'.: ;S k.
L O 7, '. L' [.' A, U
~ G ~ ?' L; 7:,c',. L
L q ? :':i ' .",,o,. L
'/J ~. ':,' ,; H A L f',; O ;' :.:.
.,, L .,...'. ~_ ~ E 5: T
5! H';, ',,: ' :' '-' ~ F '" ~:' '
. , , ~
7' F U tLS L L O ~"~ ~
;.:,:.; UF, : I N ! N 5. '! :; :,
",~.¢ 'J"'.', .;. O:'~:,"ID OIIHM ] .
: / S 'J /.'.. O F E
.,, .. ~
Y Z ,-~'. ;'.;. ':. ',. ;_ 5-:~
1 F~I':~ sequence ::vmt:,er: 2
t3};T:..' !..DT/CI~L RUN .~l',l COf.'tBINA'I',',;ON
~',iO Si:"' !3::: 'FO OIL--BASED MUD
NO :!~t:~ '-UE TO O.~;L. ~AS'ED HUD
S~"/.,:'DOFFS FLUN 0il ;}(TE
P ~ASOR .1: N DUCT][ON-GR
FLC LOGG}:NG SYSTEM
LEG ]., CONDUCTOR 6
PLATFOP,~q
R.V. WELLS
V:RSACLEAN
SI4ELi.. '"/,!ESTERN E & P~
NZDDLF. GROUND SHOAL
,/). CXYER
R/A
h;/,&
'? t: ::r.;7 512 ~
nU?:~! ::/:?', 1994
K ::
I;iS L
L [)T/C :': L
.'(NC.
1
F LEX
F
F
F
F
F
F
F
F
F
F
LB/F
F.
F
F
F
F
Lg/F
F
F
F
L !~ / -':
F
:
L ".iF
F
!.
F
DRS-C 3957
h!SC-E ??:~8
ChlC.,., l.iA
S6C--SA 294
TCC--,g !2"7
AMt, i,~-AA S
" C ~,~-. .c' ~ 54.4
N/A
"FAT
0 R O
,5/'8'
,( ::.:, .:, .D ....
t 'Z '7.6',(".
-- 5.8'Y"'/ ':J
47,
.- 5 Y'.f? .' ". ~'
....
.? / ..-~ / .
, [j .:vf;
, ~...
- 57'" .3,
--- 5 .';7, ,,'
-- ~ ./'/', , -.,
--[3.. '
..... · . .. '.. I'OH ,.619
:- .... ~': "T-~' ' :''~'
-- . '-"' ::: ' ?'-:' ~'.,E;~
:'. _: ":-l::; ': ,. 1 9
::' · -'-" .' ;:": HEAD
':':..)::': ": CS U
:.g. ~
;': .:K....'-.' ~S TOH
C! :::/ : ";'~--~ tiF: 21 ,'U,, I994 (LST),
':', ;.::.=~ :-, ......... ,',' 549524.
'
? " :. L ;'::';k]. 1
',',,". ;- :,,. :'i:: MaR A
' ' " :',A,I',':K HIDDLF: GROUND SHOAL
SHELL WESTERN E & P,
L IS
INC.
H?,lii: ;',~ '! ?,, F i; U:::; ~ F [.~ ~',I .il VALUE
BLAC
B O T
ATTE
I5~
1
AL!.
32767
F ~ E I..
12672.
?.
!
75.
N 0 K H
.Z~
C i_ 0 S
c: L OS
WA T"
r G' d
37'
.- .....
s 'r
- .'~-' ,.!Z8
r:/C3 ~:/C3
~3'T' r"
.g
N 0
i".! 0
SOON
:,;/:t T t!
I N Z,
P P M "' ~:i
D E g
DF/F
F
0 l-i ~','! M
DEG
1177
F 2 ;ilTZ
-193.4185
.... 81 ~ 2~2.g 7
-:{~t, 8GE58
"~4,5,774Z8
- 14.39!]22
2,1 ~
G2,67892
2I .,Er5299
5 ~ 24.5'5 fi 6
5 4.3 9 73 8
1 6.
5 ,, 36,2:371
7 ~ 3 7.
i843.
.-.0'. 4978864
-2,45'2543
--,6'. :7'.::. 7 ! 363
~7.,.g i i 75Jg38
.,-1, !Z~73
32
I ,)fi"
~'.9$ :5257
' D'.75
6.6,
FOE OEFIO SHIFTED FOr( PRESENTATION
LDT - CNL - GE
i~.,C., LOGGING SYSTEM
tfi~S A.'-2Z~' t 4LS
LEe 'i ~ CONDUCTOR 6
P LA"FF (:,?.H A
-r C C f< E N ~;, 0 D
V E' E f;,6, ¢': L E' A N
SHELl ~t'::.ST'ERN E & p,
M~!')D~ E (;~:OUND SHOAL
?,~/A
21.-J'..!~' ....I994
INC.
1
O.~. C-'L S /.7
Cr~L;.,C.; 3957
S fi' C --' {i,: ."-'., 2 S
fCC-':
TCt,I--A~ 544
S,~H'- C 963
...... 7 ::-',
NiA
STATE
?? c. ,. ,.
:7 3 ," ::'"
TOH
2
3
5
6
]7
15'
TO H
,c~!,r~,e on thie storage unit are:
u~,... ~r:
F ~ ~,,~ id : TOH
F~ '-?: id : TOH
:'- 'lc; id : TON
./:51 2 -