Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP-FFGU - BP Exploration (Alaska), Inc.STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROnl1CFn roS nicpnQ1TinK1 1. Facility Number 2. Facility Name 0290000000 PBU CCP/FFGU Disposition 3. Field PBU - EOA Volume MCF 4. Operator . v v • • ... • 5. MonthNear of Disposition BP Janua -2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 596,089 Pool Name Pool Code Percent 7. Reinjected 223,435,552 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 157 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,361 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,169,623 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 230,236,782 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 230,236,782 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,152 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a Z r temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 wSTPI icTinNs nni DGVGDcc ClnC BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT January 2019 junplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT -& CAUSE See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/6/2019 0858-0903 135 Not required for events <= 1 hr 1/6/2019 2015-2020 14 1/8/2019 1537-1542 g TOTAL 157 Planned events greater than 1 hour DATE TIMc TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF INCIDENT See Attachments 0 TOTAL 0 0 157 0 35,361 0 35,518 ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr AC I [ON TAKEN TO E See Attachments ACTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr Ac i wN TAKEN TO ELIMINATE See Attachments Page 1 2/13/2019 12:55 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthNear of Disposition 02900000CI PBU CCP/FFGU PBU - EOA BP Februa -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 450,152 Total Volume. Pool Name Pool Code Percent 7. Reinjected 191,445,472 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,155 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 31,886 11. Assist Gas - 12. Fuel gas used in lease operations. 5,450,308 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: MCF 14. TOTAL VOLUME (ITEMS 6-12) 197,380,973 Safety 15. NGL Gas Equivalent Lease Use MCF 0 16. Purchased gas Conservation MCF 0 Waste: MCF 17. Transferred from: CGF & FS1 197,380,973 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,982 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify tha foregoing is true an correct to the best of my knowledge. Signature Title Head of Control BP Alas Printed Name David Knapp Phone (907) 564-5775 Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE (Unplanned events less than or equal to 1 hour BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT February 2019 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 2/10/2019 0130-0156 ACTION TAKEN TO ELIMINATE CAUSE 226 Not required for events <= 1 hr Not required for events <= 1 hr 2/14/2019 0855-0928 2,030 2/15/2019 0829-0844 420 2/15/2019 1139-1156 152 2/22/2019 1022-1027 109 2/22/2019 1352-1357 109 2/22/2019 1530-1535 109 TOTAL 3,155 Planned events greater than 1 hour See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 3,155 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 31,886 Assist 0 TOTAL FLARED VOLUME 35,041 ACTION TAKEN TO E See Attachments Page 1 3/12/2019 3:34 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROnuCEn [..d►S niSpnsiTinN 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition March-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 467,135 Pool Name Pool Code- Percent 7. Reinjected 201,071,439 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,151 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,661 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,169,171 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 207,743,557 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 207,743,557 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 737 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify th a foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 iNSTRi ir.TinNC nN RFVGRCG zinc: BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT March 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/13/2019 1846-1851 156 Not required for events <= 1 hr Not required for events <= 1 hr 3/13/2019 1859-1904 3 3/14/2019 0351-0356 77 3/14/2019 0415-0420 8 3/14/2019 0428-0433 77 3/14/2019 0458-0509 16 3/14/2019 1310-1315 8 TOTAL 345 events greater than 1 hour See Attachments TOTAL 0 See Attachments NATE 1131anned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/1/2019 0040-0045 156 Not required for events <= 1 hr Not required for events <= 1 hr 3/1/2019 0256-0301 11 3/1/2019 1303-1308 141 3/1/2019 1600-1605 45 3/4/2019 1045-1050 45 3/6/2019 0830-0845 758 3/7/2019 0927-0930 8 3/8/2019 1737-1742 80 3/9/2019 0206-0211 156 3/11/2019 0211-0224 406 TOTAL 1,806 Page 1 4/14/2019 3:00 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT March 2019 JPlanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 345 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 1,806 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,661 Assist 0 TOTAL FLARED VOLUME 35,812 Page 2 4/14/2019 3:00 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator 1BP 5. MonthNear of Disposition I Aril-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 464,252 Pool Name Pool Code Percent 7. Reinjected 207,999,138 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 2,183 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,569 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,986,432 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 214,486,574 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 214,486,574 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 6,792 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify th foregoing is true and orrect to the best of my knowledge. ` Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-4694 Date AAC25.235. Form 10-422 Rev. 5/2009 INRTRI Ir.TIr)NC C1N RF\/FRCP cinF BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT April 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 1131anned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/2/2019 2254-2330 15 Not required for events <= 1 hr Not required for events <= 1 hr 4/20/2019 0031-0036 156 4/20/2019 0125-0130 135 4/20/2019 0229-0234 135 4/20/2019 0254-0259 8 4/20/2019 0404-0409 45 4/20/2019 0524-0529 8 4/20/2019 1252-1257 156 4/20/2019 1442-1447 11 4/20/2019 2106-2111 8 4/20/2019 2228-2233 8 4/20/2019 2328-2333 135 4/21/2019 0131-0136 8 4/21/2019 1543-1548 156 4/21/2019 1736-1741 8 4/21/2019 2036-2041 8 4/22/2019 0326-0331 8 4/22/2019 1334-1339 135 4/22/2019 1542-1547 14 4/22/2019 2238-2243 8 4/23/2019 0010-0015 135 4/23/2019 0023-0028 8 4/23/2019 0206-0211 8 4/23/2019 0445-0450 8 4/23/2019 0541-0546 135 4/23/2019 0740-0745 14 4/23/2019 2133-2138 45 Page 1 5/11 /2019 11:54 AM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT April 2019 4/23/2019 2348-2353 8 4/24/2019 0137-0142 135 4/24/2019 0316-0321 51 4/24/2019 2141-2146 45 4/24/2019 2259-2304 8 4/25/2019 0046-0056 135 4/25/2019 0258-0303 51 4/25/2019 1928-1933 8 4/25/2019 1943-1948 14 4/26/2019 0311-0316 135 4/26/2019 0514-0519 14 4/26/2019 2239-2244 45 4/27/2019 0004-0009 8 4/27/2019 0133-0138 8 TOTAL 2,183 LPlanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 2,183 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,569 Assist 0 TOTAL FLARED VOLUME 36,752 5/11 /2019 11:54 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP I 5. MonthNear of Disposition Ma -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 429,014 Pool Name Pool Code Percent 7. Reinjected 205,853,632 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,754 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,849 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,074,814 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 212,395,063 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 212,395,063 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 12,719 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify tha a foregoing is true a d correct to the best of my knowledge. Signature TNote: All volumes must be corrected Title Head of Control. BP Alaska to pressure of 14.65 psia and to a Printed Name David Knapp Phone (907) 564-4694 Date temperature of 60o F. Authority 20AAC25.235. Form 10-422 Rev. 5/2009 INSTRI Ir.TIrINS rlN RF\/FROG zinc BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT May 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/29/2019 0140-0150 1,448 Not required for events <= 1 hr Not required for events <= 1 hr 5/31/2019 2040-2100 242 5/31/2019 2100-2110 64 TOTAL 1,754 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 1,754 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,849 Assist 0 TOTAL FLARED VOLUME 37,603 Page 1 6/10/2019 4:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name 1PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition I June-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 395,920 Pool Name Pool Code Percent 7. Reinjected 183,897,776 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,068 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,667 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,722,103 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 190,051,534 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 190,051,534 Commissioner Date 18. Transferred to: (Express as a negative #) 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true nd correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control. BP Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-4694 Date 7 lAAC25.235. Form 10-422 Rev. 5/2009 wsTPI irTinniQ nni DC\/CDQC 01MI BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT June 2019 (Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/1/2019 0216-0223 3 Not required for events <= 1 hr Not required for events <= 1 hr 6/30/2019 2321-2341 1,065 TOTAL 1,068 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 1,068 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,667 Assist 0 TOTAL FLARED VOLUME 35,735 Page 1 7/15/2019 1:49 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Jul -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 388,371 Pool Name Pool Code Percent 7. Reinjected 165,448, 068 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 4,996 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 36,107 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,467,505 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 171,345,047 Lease Use MCF 15, NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 171,345,047 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,122 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to he best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date rS o q/% c AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSF SinF BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT Page 1 GAS FLARING AND VENTING INCIDENT REPORT July 2019 Manned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE 7/16/2019 1318-1351 3,508 Not required for events <= 1 hr ACTION TAKEN fo ELIMINATE CAUSE 7/22/2019 1503-1522 1,280 Not required for events <= 1 hr TOTAL 4,788 Manned events greater than 1 hour """` DESCRIPTION OF INCIDENT 8, CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUS See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME 7/19/2019 2020-2025 VOLUME DESCRIPTION OF INCIDENT & CAUSE 135 Not required for events ACTION TAKEN TO ELIMINATE CAUSI 7/19/2019 2330-2335 <= 1 hr 14 Not required for events <= 1 hr 7/27/2019 1333-1338 45 7/27/2019 1455-1500 6 7/27/2019 1740-1745 g TOTAL 208 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments TOTAL 0 Unplanned Events < 1 Hour TOTAL 4, 788 Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not exceeding 5,000 MCF 208 Planned Events > 1 hour or exceeding 5,000 MCF 0 Pilot Purge 36,107 Assist 0 TOTAL FLARED VOLUME 41,103 8/13/2019 3:14 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROnI)CFn roS niSpnsiTinti 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator •15- BP MonthNear of Disposition Au ust-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 390,517 Pool Name Pool Code .Percent 7. Reinjected 161,649,050 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 8,908 9. Flared or vented more than 1 hour (see instr.) 12,515 10. Pilot and Purge 36,143 11, Assist Gas 0 12. Fuel gas used in lease operations. 4,875,224 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: j �� i� /�' 17 Safety (2—/ �` J MCF 14. TOTAL VOLUME (ITEMS 6-12) 166,972,357 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 166,972,357 1��-123' 1-7 Date 18. Transferred to: (Express as a negative #) 01Commissioner 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,793 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and cor ct to the b t my knowledge. / Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure Of 14.65 psis and to a Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20 r 1,7, Z-c� AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE �mF BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT August 2019 (Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/7/2019 2100-2120 2,983 Not required for events <= 1 hr Not required for events <= 1 hr 8/7/2019 2100-2105 408 8/8/2019 0907-0947 4,953 8/8/2019 0918-0923 141 8/24/2019 1415-1420 135 8/27/2019 1505-1510 141 TOTAL 8,761 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/29/2019 1016-1130 12,515 See Attachments See Attachments TOTAL 12,515 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/9/2019 2006-2011 45 Not required for events <= 1 hr Not required for events <= 1 hr 8/9/2019 2026-2031 77 8/9/2019 2227-2232 11 8/11/2019 0316-0321 14 TOTAL 147 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 8,761 Unplanned Events> 1 Hour 12,515 Planned Events < 1 hour and not 147 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 36,143 Assist 0 TOTAL FLARED VOLUME 57,566 Page 1 9/13/2019 10:26 AM M N le CV N L (7 ❑ m O N 0 o c0 E 0 y 0 0 y a d M � a r+ Gf to W O � d d O. E f0 IC ) 7 LL LL Z I N 0 U w Of CD a m 0 Z O Z O Z E r E m 0 0 0 Cl) E m O O O m O N W N 0 0 0 3 0 m N O 0 0 r N m M� N m a STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DiSPnSiTinN 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator v • BP 5. Month/Year of Disposition Se tember-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 388,075 Pool Name Pool Code Percent 7. Reinjected 175,667,935 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 541 9. Flared or vented more than 1 hour (see instr.) 19,580 10. Pilot and Purge 34,947 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,267,741 13. Other (see instructions) 0Official Use Only Authorization >1 hr: j i` Safety I � V MCF 14. TOTAL VOLUME (ITEMS 6-12) 181,378,819 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 181,378,819 n Commissioner l Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 5,316 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and co ect to the best of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date p e ' f. AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSF SinF BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT September 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/18/2019 0314-0319 141 Not required for events <= 1 hr Not required for events <= 1 hr 9/18/2019 1430-1435 8 9/23/2019 0915-0920 135 TOTAL 284 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME 9/1/2019 2245-2250 VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 77 Not required for events <= 1 hr Not required for events <= 1 hr 9/3/2019 1630-1635 45 9/6/2019 1434-1439 135 TOTAL 257 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/6/2019 1402-1638 19,580 See Attachments See Attachments TOTAL 19,580 TOTAL Unplanned Events < 1 Hour 284 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 257 exceeding 5,000 MCF Planned Events > 1 hour or 19,580 exceeding 5,000 MCF Pilot Purge 34,947 Assist 0 TOTAL FLARED VOLUME 55,068 Page 1 10/15/2019 10:03 AM N a7 E N O > LL � tU m tf O E m 0 > 0 c O O ~ a a) Y O E cn Y U fa m c CD L d c O 91 O � O L 0 _m Ll. m d E V ~ V o d E 1- tf ate+ a) 0 rn rn N N o o0O M E .O+ O N a) o 0 N t O fn W 0 d m m o. E 16 to cr 7 ii LL Z 0 F 0 z a a m I o 0 v N N ai N a N O Z a U U N o 0 0 o > z _c a E > 0 N `m E O c O -o co M c V p, U c E 3 a o o p o n N N j O N � � W N O > N O Q 0 c o Q) 3 o U o 3 U U o N m N N � o U p Op G U - Y N @ C � 0000 O N N M rn 0 0 rn 0 m m a STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3. Field 4. Operator 5. MonthNear of Disposition 0290000000 PBU CCP/FFGU PBU - EOA BP October-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 422,452 Total Volume. Pool Name Pool Code Percent 7. Reinjected 192,233,968 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 3,760 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 36,083 11. Assist Gas 0 12. Fuel gas used in lease operations. 5,667,878 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 198,364,141 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 198,364,141 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,471 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true anorcorrec�to the best of my Signature ` Printed Name Mark Littlefield Phone (907) 564-5775 Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Form 10-422 Rev. 5/2009 iKicTDI irrinnic n�, —"rn r BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT- CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT October 2019 events less than or equal to 1 hour 10/21/2019 0734-0740 vvLUrviC UtSLKIPTION OF INCIDENT & CAUSE 1,671 Not required for events <= 1 hr 10/21/2019 2220-2225 77 10/21/2019 2251-2256 77 10/22/2019 0220-0225 109 TOTAL 1,934 Inplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSI See Attachments TOTAL 0 lanned events less than or equal to 1 hour DATE 10/23/2019 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 0220-0225 135 Not required for events <= 1 hr 10/23/2019 0403-0408 8 10/23/2019 2120-2125 77 10/25/2019 1133-1138 135 10/25/2019 1343-1348 8 10/25/2019 1413-1418 6 10/25/2019 1945-1950 135 10/25/2019 2111-2116 135 10/25/2019 2343-2350 14 10/26/2019 0054-0059 156 10/26/2019 0805-0810 135 10/26/2019 1249-1254 11 10/26/2019 2046-2049 45 10/26/2019 2200-2205 135 10/27/2019 0004-0009 8 10/27/2019 0028-0033 5 10/27/2019 0344-0349 77 10/27/2019 1023-1028 135 10/27/2019 2024-2029 45 10/27/2019 2031-2036 8 10/27/2019 2058-2103 77 Not required for events <= 1 hr AL-FION TAKEN TO E See Attachments HwRlN IAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr Page 1 11/17/2019 1:15 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT October 2019 10/28/2019 0127-0132 156 10/28/2019 0330-0335 8 10/28/2019 1213-1218 g 10/28/2019 1445-1450 156 10/28/2019 1701-1706 g TOTAL 1,826 Planned events greater than 1 hour uex.rciFFION OF INCIDENT See Attachments TOTAL 0 TOTAL1,934 Unplanned Events < 1 Hour Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not exceeding 5,000 MCF 1,826 Planned Events > 1 hour or exceeding 5,000 MCF 0 Pilot Purge 36,083 Assist 0 TOTAL FLARED VOLUME 39,843 See Attachments Page 2 11/17/2019 1:15 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000000 PBU CCP/FFGU 3. Field 4. Operator 5. Month/Year of Disposition PBU - EOA BP Disposition November -2019 Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 479,647 Total Volume. Pool Name Pool Code 7. Reinjected PRUDHOE Percent 210,130, 853 640150 100.00% 8. Flared or vented 1 hour or less 569 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 34,831 11. Assist Gas 0 12. Fuel gas used in lease operations. E4 5,995,649 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: MCF Safety 14. TOTAL VOLUME (ITEMS 6-12) 216,641,549 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: CGF & FS1 216,641,549 Commissioner 18. Transferred to: (Express as a negative #) 0 Date 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, 18: Fuel Gas to Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel LPC = 0 mscf Gas = 9,079 mscf; Block I hereby certify that the foregoing is true and#rrect -to Vrfhe best of my Signature Printed Name Mark Littlefield Phone (907) 564-5775 Date Note: All volumes must be corrected E2Rka to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 7 I nnrI)c nnc Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVGpcc cin, BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT November 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/25/2019 0316-0321 420 Not required for events <= 1 hr Not required for events <= 1 hr 11/25/2019 1320-1325 135 11/25/2019 1530-1535 14 TOTAL 569 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 569 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,831 Assist 0 TOTAL FLARED VOLUME 35,400 Page 1 12/14/2019 3:48 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DiSpnSiTinN 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator • BP 5. MonthNear of Disposition December-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 596,901 Pool Name Pool Code Percent 7. Reinjected 1 216,759,385 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 102 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 35,988 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,415,195 13. Other (see instructions) 0Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 223,807,571 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: CGF & FS1 223,807,571 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,544 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and c rect to h� st of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20 / L ©'t-, AAC25.235. Form 10-422 Rev. 5/2009 iN.RTRi ir.Tir)Nc nti PFVGpcc cinc: BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT December 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/3/2019 0426-0431 51 Not required for events <= 1 hr Not required for events <= 1 hr 12/3/2019 0527-0531 51 TOTAL 102 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 102 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,988 Assist 0 TOTAL FLARED VOLUME 36,090 Page 1 1 / 15/2020 2:45 PM