Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 3 - BP Exploration (Alaska), Inc.STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I Janua -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 6,736 10. Pilot and Purge 23,435 11. Assist Gas 0 12. Fuel gas used in lease operations. 534,845 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: /G! ��` �� Safety ` C / MCF 14. TOTAL VOLUME (ITEMS 6-12) 565,016 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 / Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,507,420 14 19. Remarks: I hereby certify th oregomg is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control, BP Alaska to pressure of 14.65 psia and to a Printed Name David Knapp Phone (907) 564-5775 Datemperature of 60o F. Authority 20 te Z �� AAC25.235. Form 10-422 Rev. 5/2009 INCTRI Ir TIr1NC ON] RF\/FRCG crow BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT January 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/15/2019 1014-1151 6,736 See Attachments See Attachments TOTAL 6,736 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 6,736 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 23,435 Assist 0 TOTAL FLARED VOLUME 30,171 Page 8 2/13/2019 12:55 PM Flare Start Date 01/01/2019 Flare End Date 01/31/2019 GC3 Flare Report Total Volume (MSCF) 6736 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume riare Keuer 01/15/2019 10:14:00 am 11:51:00 am 97 min Yes No No BP1\MARTINJE 6736 Determination Cause High gas transit line pressure caused by CGF compressor problems due to power failure. Action Taken _ PCC shut in wells and reduced chokes on wells to reduce rate here on WOA side of the field until CGF power was re -stored and ,- Total Volume (MSCF) 6736 jenerated 02/06/2019 9:23:02AM Page 8 of 8 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODIMM ro-qnicpnQ1TinK1 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. Month/Year of Disposition BP Februa -2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 26,574 11. Assist Gas 0 12. Fuel gas used in lease operations. 482,072 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 508,646 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -21,528,097 19. Remarks: I hereby certify thA.14e foregoing is trVp a correct to the best of my knowledge. Note: All volumes must be corrected SignatureA Title Head of Control BP Alaska to pressure of 14.65 psia and to a Printed Name David Knapptemperature of 60o F. Authority 20 Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev, 5/2009 INSTRUCTIONS ON REVERSE SIDE events less than or equal to 1 hour nned events neo events DATE nned events TOTAL Ater than 1— hour TOTAL in or equal to 1 hour TOTAL IMM-SROR--ho than 1 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT February 2019 Not required for events <= 1 hr 3- See Attachments 0 uca'-KIFU1ON OF INCIDENT— g,- CAVM Not required for events <= 1 hr 0 See Attachments 0 TOTAL 0 0 0 0 26,574 0 26,574 Not required for events <= 1 hr See Attachments "J ranwINATE CAUSE Not required for events <= 1 hr See Attachments Page 8 3/12/2019 `-IA n.. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I March-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 680 10. Pilot and Purge 28,401 11. Assist Gas 0 12. Fuel gas used in lease operations. 532,754 13. Other (see instructions) p Official Use Only Authorization >1 hr: _/ G / /� Safety � MCF 14. TOTAL VOLUME (ITEMS 6-12) 561,835 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 6 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -24,030,566 19. Remarks: I hereby certify tha foregoing is true and correit to the best of my knowledge. Note: All volumes must be corrected SignatureTitle Head of Control BP Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRI1CTInNC nKJ RF\/FRCP Ring BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT March 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr Page 9 TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/12/2019 0400-0545 680 See Attachments See Attachments TOTAL 680 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 680 exceeding 5,000 MCF Pilot Purge 28,401 Assist 0 TOTAL FLARED VOLUME 29,081 4/14/2019 3:00 PM Flare Start Date 03/01/2019 Flare End Date 03/31/2019 GC3 Flare Report Total Volume (MSCF) 680 Report Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 19-57 Flare Relief 03/12/2019 4:00:00 am 5:45:00 am 105 min Yes No Yes BP1\MARTINJE 680 Determination Cause Shutdown HP production to repair a leak in skid-4. Action Taken Repair completed. Total Volume (MSCF) 680 Generated 04/02/2019 10:10:59AM Page 5 of 5 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROM mim [,oS n1cpnc1T1nK1 1. Facility Number 2. Facility Name PBU GC 3 Disposition - - -- - - Id PBU WOA Volume MCF --- -- -- - - _-...�@v BPperator MonthNear of Disposition0290000033 5Aril-2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 120 9. Flared or vented more than 1 hour (see instr.) 1,800 10. Pilot and Purge 25,090 11. Assist Gas 0 12. Fuel gas used in lease operations. 434,444 13. Other (see instructions) 0Official Use Only Authorization >1 hr: ///�(� Safety � 0 r MCF 14. TOTAL VOLUME (ITEMS 6-12) 461,454 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -23,734,548 19. Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. ` Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a Printed Name David Knapp Phone (907) 564-4694 Date temperature of 60o F. Authority 20A 2 2 35. Form 10-422 Rev. 5/2009 INSTRUCTinNs nKi RFVFRRF sing BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT April 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/29/2019 1727-1800 120 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 120 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 9 TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/3/2019 1325-1657 1,800 See Attachments See Attachments TOTAL 1,800 TOTAL Unplanned Events < 1 Hour 120 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 1,800 exceeding 5,000 MCF Pilot Purge 25,090 Assist 0 TOTAL FLARED VOLUME 27,010 5/11 /2019 11:54 AM Flare Start Date 04/01/2019 Flare End Date 04/30/2019 Report GC3 Flare Report Total Volume (MSCF) 1920 Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 19-75 Flare Relief 04/03/2019 1:25:00 pm 4:57:00 pm 212 min No No Yes BP1\MARTINJE 1800 Determination Cause Spin to cool turbine for water wash Action Taken Completed cool down Daily Volume (MSCF) 1800 Total Volume (MSCF) 1920 Generated 05/05/2019 2:12:32PM Page 12 of 12 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I Ma -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 27,797 11. Assist Gas 0 12. Fuel gas used in lease operations. 531,541 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 559,338 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -25,444,106 19. Remarks: I hereby certify that a foregoing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control. BP Alaska to pressure of 14.65 psia and to a Printed Name David Knapp Phone (907) 564-4694 Date temperature of 60o F. Authority 20 AAC25.235. Form 10-422 Rev. 5/2009 INRTRI IrtTIr)NS r)KI RFVCI7CC cinr- BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT May 2019 nplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr ACTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr TOTAL p Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 nned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF IN; See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 27,797 Assist 0 TOTAL FLARED VOLUME 27,797 CAUSE ACTION TAKEN TO ELIMINATE See Attachments Page 8 6/10/2019 4:30 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITI(W 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition June-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 23,186 11. Assist Gas 0 12. Fuel gas used in lease operations. 501,978 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 525,164 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: jMCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -24,301,116 19. Remarks: I hereby certify oregoing Is true and orrect to the best of my knowledge. �---� Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name David Knapp Phone (907) 564-4694 Date t 8 AA 2 .23 . Form 10-422 Rev. 5/2009 INRTRI 1r.TinKj.q r1N RFVFacG cinr nplanned events less than or equal to 1 hour DATE TIME VOLUME nplanned events TOTAL Iter than 1 our TIME TOTAL anned events less than or equal to 1 hour DATE TIME v ned events DATE TOTAL mnmw—m-w� r than 1 hour MNMMNw=wMMMwTIME TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT June 2019 utx KIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr 0 E DESCRIPTION OF INCIDENT & CAUSE See Attachments 0 E DESCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr 0 VOLUME DESCRIPTION OF INI See Attachments 0 TOTAL 0 0 0 0 23,186 0 23,186 AL ION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr ACTION TAKEN TO E See Attachments ACTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr Ht I ION TAKEN TOE See Attachments Page 8 7/15/2019 1:49 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODL]CEn rAS ni.gPrnsiTinN 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. MonthNear of Disposition I Jul -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 22,030 11. Assist Gas 12. Fuel gas used in lease operations. 493,084 13. Other (see instructions) 0Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 515,114 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: Ex ress as a negative # CGF (Express 9 ) -19,498,462 19. Remarks: I hereby certify that the foregoing is true and rect to t best of my knowledge. ��G, Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a Q temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date Olt AAC25.235. Form 10-422 Rev. 5/2009 a icTPJ irTinnic nni owCoec -- BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT July 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr Page 8 TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 22,030 Assist 0 TOTAL FLARED VOLUME 22,030 8/13/2019 3:14 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROni im=n rec n1cDnc1r1nK1 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. MonthNear of Disposition BP Au ust-2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 15,611 10. Pilot and Purge 21,301 11. Assist Gas 0 12. Fuel gas used in lease operations. 434,163 13. Other (see instructions) Official Use Only Authorization>1 hr: 7 r 110,'Z��/�� % safety j v 2—( � MCF 14. TOTAL VOLUME (ITEMS 6-12) 471,075 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 6 Commissioner Dater 18. Transferred to: (Express as a negative #) CGF -20,949,897 19. Remarks: I hereby certify that the foregoing is true and c rrect to e e of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date 9— 7 -Z,11 f AAC25.235. Form 10-422 Rev. 5/2009 inicroi irrin is — --- -,-- Unplanned events less than or equal to 1 hour DATE TIME Vol 1 TOTAL Unplanned events greater than 1 hour DATE TIME 8/1/2019 1000-1558 8/5/2019 0845-1822 TOTAL Planned events less than or equal to 1 hour DATE TIME lanned events DATE 8/24/2019 TOTAL ter than 1 hour TIME 0131-0430 TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT August 2019 DESCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr t7 Mt DESCRIPTION OF INCIDENT & 1,100 See Attachments 10,160 11,260 DESCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr 1 ME DESCRIPTION OF INCIDENT & CAUSE 4,351 See Attachments 4,351 TOTAL 0 11,260 0 4,351 21,301 0 36,912 ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr ACTION TAKEN TO ELIMINATE See Attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr ACTION TAKEN TO E See Attachments Page 9 9/13/2019 10:26 AM Flare StartDate 08/01/2019 Flare End Date 08/31/2019 GC3 Flare Report Report Total Volume (MSCF) 15611 Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 19-224 Flare Relief 08/01/2019 10:00:00 am 3:58:00 pm 358 min Yes No No BPIIMOORDV 1100 Determination Cause Shut in "C" pad so depressuring lines to plant Action Taken No response taken as this was deemed to be of short duration. 19-227 Flare Relief 08/05/2019 8:45:00 am 6:22:00 pm 577 min Yes NO No BPIIMOORDV 10160 Determination Cause Pressure testing "C" pad after S/D Action Taken After pressure test was completed flare valve on "A" S/C put back to normal. 19-261 Flare Relief 08/24/2019 1:31:00 am 4:30:00 am 179 min No --------------- No Yes BP1\MARTINJE 4351 Determination Cause Taking advantage of TAPS shutdown we de -pressured HP separator for maintenance and work. Action Taken Completed de -pressuring HP. Total Volume (MSCF) 15611 Generated 09/06/2019 9:55:18AM Page 12 of 12 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY RFPnRT n1= PPnni InCr% f%— A 0 Form 10-422 Rev. 5/2009 INSTRI IrTir'%nfc nni nplanned events less than or equal to 1 hour DATE TIME VOLUME TOTAL Unplanned events greater than 1 hour DATE TIME 9/26/2019 1359-1800 TOTAL Planned events less than or equal to 1 hour DATE TIME u TOTAL anned events greater than 1 DATE TO MR M,.M TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT September 2019 ut,SCRIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr C DESCRIPTION OF INi 60 See Attachments 60 utsCKIPTION OF INCIDENT & CAUSE Not required for events <= 1 hr n E DESCRIPTION OF INCIDENT See Attachments I Unplanned Events < 1 Hour TOTAL0 Unplanned Events > 1 Hour 60 Planned Events < 1 hour and not exceeding 5,000 MCF 0 Planned Events > 1 hour or exceeding 5,000 MCF 0 Pilot Purge 21,293 Assist 0 TOTAL FLARED VOLUME 21,353 ACTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSI Not required for events <= 1 hr ACTION TAKEN TO ELIMINATE See Attachments Page 9 10/15/2019 10:03 AM Flare StartDate 09/01/2019 Flare End Date 09/30/2019 GC3 Flare Report Report Total Volume (MSCF) 60 Numbe System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported B 19-311 Flare Relief 09/26/2019 1:59:00 m 6:00:00 P p y Volume P m 241 min Yes Determination Cause HP separator "D" bank blow down for safe out. No No BPIIMOORDV 60 Action Taken Stopped after psi reached 0 psi. Generated 10/08/2019 3:17:38PM Page 9 of 9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PROM M.Fn [,oS nicancrrinKi 1. Facility Number 2. Facility Name 0290000033 PBU GC 3 Disposition 3. Field PBU - WOA Volume MCF 4. Operator 5. Month/Year of Disposition BP October-2019 20. Forproduction from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 25,137 11. Assist Gas 0 12. Fuel gas used in lease operations. 518,521 13. Other (see instructions) Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 543,658 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -21,639,205 19. Remarks: I hereby certify that the foregoing is true and Korrect to he st of my knowledge. Note: All volumes must be corrected Signature �/ Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield temperature of 60o F. Authority 20 Phone (907) 564-5775 Date / 4J 2 G j AAC25.235_ Form 10-422 Rev. 5/2009 wcTPI 1rT1nn1c nni owcocc —, BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT October 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 25,137 Assist 0 TOTAL FLARED VOLUME 25,137 Page 10 11 /17/2019 1:15 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 15. Month/Year of Disposition I November-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 19,412 11. Assist Gas 0 12. Fuel gas used in lease operations. 546,171 13. Other (see instructions) 0Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 565,583 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -27,121,742 19. Remarks: I hereby certify that the foregoing is true and corre o the best f m knowledge. Note: All volumes must be corrected Signature G < Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20 AA 2 .2 35, Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSF SinF BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT November 2019 Page 8 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 19,412 Assist 0 TOTAL FLARED VOLUME 19,412 12/14/2019 3:48 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA 4. Operator BP 15. Month/Year of Disposition I December-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code Percent 7. Reinjected 0 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 18,603 11. Assist Gas 0 12. Fuel gas used in lease operations. 582,130 13. Other (see instructions) 0 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 600,733 Lease Use MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: JMCF 17. Transferred from: 0 Commissioner Date 18. Transferred to: (Express as a negative #) CGF -29,634,225 19. Remarks: I hereby certify that the foregoing is true and correctto the bes) of my knowledge. i� Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS nN RFVFRSF CIr1F BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING AND VENTING INCIDENT REPORT December 2019 jUnplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 18,603 Assist 0 TOTAL FLARED VOLUME 18,603 Page 9 1 /15/2020 2:45 PM