Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GMPA) - BP Exploration (Alaska), Inc.STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT
OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
12. Facility Name
IPBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
5. MonthNear of Disposition
Disposition
Volume MCF
BP Janua -2019
20. For production from multiple pools, list contribution of each pool as a percent of
6.
Sold
109,903
Total Volume.
Pool Name
Pool Code
Percent
7.
Reinjected
10,656,000
Prudhoe Bay,Lisburne Oil
640144
61.7%
Prudhoe Bay,Niakuk Oil
640148
0.3%
8.
Flared or vented 1 hour or less
0
Prudhoe Bay,Pt Mcint re Oil
640180
33.7%
Prudhoe Bay,Prudhoe Oil
640150
2.9%
9.
Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bay,Raven Oil
640147
1.4%
Prudhoe Bay, W Beach Oil
640186
0.0%
10.
Pilot and Purge
12,001
Prudhoe Bay, N Prudhoe Bay
640152
0.0%
11.
Assist Gas
106,989
12.
Fuel gas used in lease operations.
875,450
13.
Other (see instructions)
2,490,995
Official Use Only
Authorization >1 hr:
MCF
14.
TOTAL VOLUME (ITEMS 6-12)
14,251,338
Safety
15.
NGL Gas Equivalent
109,903
Lease Use
MCF
16.
Purchased gas
Conservation
MCF
0
Waste:
MCF
17.
Transferred from:
1,901,373
18.
Transferred to: (Express as a negative #)
0
Commissioner Date
19.
Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe
= 1,901,373 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 18,272
I hereby certify that oregoing is true and c rect to the best of my knowledge.
Signature Title Head of Control BP Alaska Note: All volumes must be corrected
to pressure of 14.65 psia and to a
Printed Name David S. Kna temperature of 600 F. Authority 20
pp Phone (907) 564-4694 Date Z 9 n nr+)c noc
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSF cinF
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot
7,403
Continuous Assist
65,811
TOTAL FLARED
73,214
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,057
Continuous Assist 35,928
TOTAL FLARED 39,985
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 42
Continuous Assist 362
TOTALFLARED 404
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
VOLUME
DATE TIME
Total Flare <= 1 Hour
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot
167
Continuous Assist
1,494
TOTAL FLARED
1,661
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare —1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot
332
Continuous Assist
3,394
TOTAL FLARED
3,726
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 9, CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
0
Continuous Assist
0
TOTALFLARED
0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name
0290000009 PBU LISBURNE PROD GPMA
Disposition
3. Field
PBU - GPMA
Volume MCF
4. Operator 5. MonthNear of Disposition
BP I Februa -2019
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
120,911
Pool Name
Pool Code
Percent
7. Reinjected
9,992,020
Prudhoe BaV, Lisburne Oil
640144
58.9%
Prudhoe Bay,Niakuk Oil
640148
0.4%
8. Flared or vented 1 hour or less
371
Prudhoe Bay,Pt Mcint re Oil
640180
37.8%
Prudhoe Bay,Prudhoe Oil
640150
1.6%
9. Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bay,Raven Oil
640147
1.2%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
10,809
Prudhoe BaV, N Prudhoe PaL
640152
0.0%
11. Assist Gas
86,925
12. Fuel gas used in lease operations.
789,369
13. Other (see instructions)
1,784, 336
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,784,741
Lease Use
MCF
15. NGL Gas Equivalent
120,911
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
2,067,553
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,067,553 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent) = 14,871
f hereby certify tha foregoing is true and corre to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a
Printed Name David S. Knapp Phone (907) 564-5775 Date temperature of 60o F. Authority 20
AA
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
2/3/2019 07:07 - 08:00 229 Not required for events < 1 hour
Total Flare <= 1 Hour 229
Total Flare > 1 Hour 0
Volume Flared 229
Measured Safety Pilot
6,356
Continuous Assist
51,118
TOTAL FLARED
57,703
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Not required for events < 1 hour
VOLUME
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/3/2019 07:07 - 08:00 5 Not required for events < 1 hour U Not required for events < 1 hour
Total Flare <=1 Hour 5
Total Flare > 1 Hour
0
Volume Flared
5
Measured Safety Pilot
178
Continuous Assist
1,426
TOTAL FLARED
1,609
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
2/3/2019 07:07 - 08:00 131 Not required for events < 1 hour
Total Flare <=1 Hour 131
Total Flare > 1 Hour
Volume Flared 131
Measured Safety Pilot
4,102
Continuous Assist
32,986
TOTAL FLARED
37,219
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for events < 1 hour
VOLUME
DATE TIME (Ms
2/3/2019 07:07 - 08:00 1
Total Flare <=1 Hour 1
Total Flare > 1 Hour
0
Volume Flared
1
Measured Safety Pilot
40
Continuous Assist
321
TOTALFLARED
362
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
DESCRIPTION OF INCIDENTS & CAUSE
Not required for events < 1 hour
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U Not required for events < 1 hour
VOLUME
DATE TIME
2/3/2019 07:07 - 08:00
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
133
Continuous Assist
1,074
TOTAL FLARED
1,212
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-19
DESCRIPTION OF INCIDENTS & CAUSE
Not required for events < 1 hour
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Not required for events < 1 hour
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. Month/Year of Disposition
I March-2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
135,863
Pool Name
Pool Code
Percent
7. Reinjected
11,339,185
Prudhoe Bay,Lisburne Oil
640144
65.1 %
Prudhoe Bay,Niakuk Oil
640148
0.2%
8. Flared or vented 1 hour or less
0
Prudhoe Bay,Pt Mcint re Oil
640180
27.7%
Prudhoe Bay,Prudhoe Oil
640150
6.0%
9. Flared or vented more than 1 hour (see instr.)
15
Prudhoe Bay,Raven Oil
640147
1.0%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
11,867
Prudhoe Bay, N Prudhoe Bay
640152
0.0%
11. Assist Gas
111,488
12. Fuel gas used in lease operations.
882,487
13. Other see instructions
( )
1,882,559
Official Use Only
Authorization>1 hr.
`�f'
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
14,363,464
Lease Use
MCF
15. NGL Gas Equivalent
135,863
Conservation
MCF
16. Purchased gas
0
Waste:
JMCF
17. Transferred from:
2,243,276
p q
Commissioner DAte
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,243,276 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas eugivalent) = 18,226
1 hereby certify that th foregoing is true a d collrect to the best of my knowledge.
1
Note: All volumes must be corrected
Signature Title Head of Control, BP Alaska to pressure of 14.65 psia and to a
Printed Name David S. Knapp Phone (907) 564-5775 Date temperature of 60o F. Authority 20AAC25.235.
Form 10-422 Rev. 5/2009 iNCTPI 1(`T1r)KM nni rnGVGocG cinC:
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
During phase 2 weather conditions at the LPC, the liquid pit pilots
3/22/2019 15:30 -21:30 11 became extinguished and there was cold venting of gas.
Total Flare > 1 Hour 11
Volume Flared 11
Measured Safety Pilot 7,738
Continuous Assist 72,796
TOTAL FLARED 80,545
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Isolate the liquid flare. Remove snow and
U put flare back in service.
VOLUME
DATE TIME
Total Flare <=1 Hour 0
3/22/2019 15:30 -21:30 3
Total Flare > 1 Hour 3
Volume Flared 3
Measured Safety Pilot
3,271
Continuous Assist
30,552
TOTAL FLARED
33,826
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
DESCRIPTION OF INCIDENTS & CAUSE
During phase 2 weather conditions at the LPC, the liquid pit pilots
became extinguished and there was cold venting of gas.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Isolate the liquid flare. Remove snow and
U put flare back in service.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
26
Continuous Assist
247
TOTALFLARED
273
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
118
Continuous Assist
1,108
TOTAL FLARED
1,226
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour
During phase 2 weather conditions at the LPC, the liquid pit pilots
3/22/2019 15:30 -21:30 1 became extinguished and there was cold venting of gas.
Total Flare > 1 Hour 1
Volume Flared 1
Measured Safety Pilot 714
Continuous Assist 6,785
TOTAL FLARED 7,500
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Isolate the liquid flare. Remove snow and
put flare back in service.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare —1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 12. Facility Name 3. Field
0290000009 PBU LISBURNE PROD GPMA PBU -GPMA 4. Operator 5. Month/Yearof Disposition
BP Aril-2019
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a er t f
6. Sold
126,460
p cen o
Total Volume.
7. Reinjected
9,843,765
Pool Name
Pool Code
Percent
Prudhoe Bay,Lisburne Oil
Prudhoe Bay,Niakuk Oil
Prudhoe Bay,Pt Mcint re Oil
640144
640148
640180
66.4%
0.4%
8. Flared or vented 1 hour or less
5
Prudhoe Bay,Prudhoe Oil
640150
26.9%
5.1
9. Flared or vented more than 1 hour (see instr.)
12,752
Prudhoe Bay,Raven Oil
Prudhoe Bay, W Beach Oil
Prudhoe Bay, Sag Riv Undef
640147
640186
0.5%
0.0%
10. Pilot and Purge
11,446
640165
0.8%
11. Assist Gas
134,068
12. Fuel gas used in lease operations.
837,612
13. Other (see instructions)
1,758,989
Official Use Only
Authorization >1 hr:
J((
Safety
752�
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,725,097
15. NGL Gas Equivalent
Lease Use
MCF
126,460
16. Purchased gas Conservation
0 Waste:
17. Transferred from: 1,356,401 y
18. Transferred to: (Express as a negative #) 0 Commissioner Date
19. Remarks: Block 13: Lift Gas Otf Field; Block 17: MI from Prudhoe = 1,356,401 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF (gas equivalent = 15,146
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Note: All volumes must be corrected
Title Head of Control BP Alaska to pressure of 14.65 psia and to a
Printed Name David S. Knapp Phone (907) 564-5775 Date „ temperature of 600 F. Authority 20
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSiF cinF
VOLUME
DATE TIME
4/18/2019 17:26-17:40 3
Total Flare <=1 Hour 3
4/8/2019 15:15-16:54 9,138
Total Flare> 1 Hour
9,138
Volume Flared
9,141
Measured Safety Pilot
7,615
Continuous Assist
89,061
TOTAL FLARED
205,817
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
DESCRIPTION OF INCIDENTS & CAUSE
1807 reinjection compressor shutdown on 2nd stage nozzles
not tracking set point. Battery charger is not working.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U
Field production cut to lower gas production
U until 1807 could be restarted.
VOLUME
DATE TIME (MS1
4/18/2019 17:26-17:40 2
Total Flare <= 1 Hour 2
4/8/2019 15:15 - 16:54 2,271
Total Flare > 1 Hour
2,271
Volume Flared
2,273
Measured Safety Pilot
3,060
Continuous Assist
36,002
TOTALFLARED
41,335
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
DESCRIPTION OF INCIDENTS & CAUSE
1807 reinjection compressor shutdown on 2nd stage nozzles not
tracking set point. Battery charger is not working.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U
Field production cut to lower gas production
U until 1807 could be restarted.
DATE TIME
Total Flare <=1 Hour
VOLUME
0
4/8/2019 15:15-16:54 57
Total Flare > 1 Hour 57
Volume Flared 57
Measured Safety Pilot 43
Continuous Assist S13
TOTALFLARED 613
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
DESCRIPTION OF INCIDENTS & CAUSE
1807 reinjection compressor shutdown on 2nd stage nozzles
not tracking set point. Battery charger is not working.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Field production cut to lower gas production
U until 1807 could be restarted.
VOLUME
DATE TIME
Total Flare <=1 Hour 0
4/8/2019 15:15 - 16:54 320
Total Flare > 1 Hour
320
Volume Flared
320
Measured Safety Pilot
145
Continuous Assist
1,704
TOTALFLARED
2,169
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
DESCRIPTION OF INCIDENTS & CAUSE
1807 reinjection compressor shutdown on 2nd stage nozzles not
tracking set point. Battery charger is not working.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Field production cut to lower gas production
until 1807 could be restarted.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
VOLUME
DATE TIME (MSCf) DESCRIPTION OF INCIDENTS & CAUSE
Total flare <=1 Hour
1807 reinjection compressor shutdown on 2nd stage nozzles not
4/8/2019 15:15 - 16:54 966 tracking set point. Battery charger is not working.
Total Flare > 1 Hour
966
Volume Flared
966
Measured Safety Pilot
S83
Continuous Assist
6,788
TOTALFLARED
8,337
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Field production cut to lower gas production
until 1807 could be restarted.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour p
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot p
Continuous Assist p
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour p
Total Flare > 1 Hour p
Volume Flared p
Measured Safety Pilot p
Continuous Assist p
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3 Field
0290000009
IPBU LISBURNE PROD GPMA
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
Ma
Disposition
Volume MCF
-2019
20. For production from multiple pools, list contribution of each pool as a percent Of
Total Volume.
6. Sold
127,680
Pool Name
Pool Code
Percent
7. Reinjected
9,325,585
Prudhoe Bay, Lisburne Oil
640144
57.6%
Prudhoe Bay, Niakuk Oil
640148
0.6%
8. Flared or vented 1 hour or less
3
Prudhoe Bay, Pt Mcint re Oil
640180
28.3%
Prudhoe Bay, Prudhoe Oil
640150
9.7%
9. Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bay, Raven Oil
640147
1.8%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
11,846
Prudhoe Bay, Sag Riv Undef
640165
2.0%
11. Assist Gas 147,839
12. Fuel gas used in lease operations. 821,594
13. Other (see instructions) 2,002,300 Official Use Only
Authorization >1 hr: MCF
Safety
14. TOTAL VOLUME (ITEMS 6-12) 12,436,847
Lease Use MCF
15. NGL Gas Equivalent 127,680
16. Purchased gas 0 Conservation MCF
Waste: MCF
17. Transferred from: 1,636,536
18. Transferred to: (Express as a negative #) 0 Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,636,536 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 11,969
hereby certify that th oing is true and correct to the best of my knowledge.
Note: All volumes must be corrected
Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a
) /', f�� temperature of 60o F. Authority 20
(
Printed Name David S. Knapp Phone 907 564 4694 Date I / AAC25.235.
—.. 1
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/28/2019 17:23-17:24
Total Flare <=1 Hour
Total Flare > 1 Hour 0
Volume Flared
Measured Safety Pilot 6,813
Continuous Assist 85,032
TOTAL FLARED 91,847
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/28/2019 17:23-17:24
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 3,349
Continuous Assist 41,795
TOTAL FLARED 45,145
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 68
Continuous Assist 849
TOTALFLARED 917
VOLUME
DATE TIME
Total Flare <= 1 Hour
Total Flare > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
456
Continuous Assist
5,691
TOTAL FLARED
6,147
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE
VOLUME
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 1,160
Continuous Assist 14,472
TOTAL FLARED 15,632
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-19
VOLUME DATE TIME PLANNED
(MSCF) DESCRIPTION OF INCIDENTS &CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTALFLARED 0
ALASKA OIL AND
FACILITY REPORT OF
1. Facility Number 2. Facility Name
0290000009 IPBU Lty Name PROD GPMA
STATE OF ALASKA
GAS CONSERVATION
PRODUCED
3. Field
PBU -GPMA
COMMISSION
GAS DISPOSITION
4. O erator
p 5. Month/Year of Disposition
BP June-2019
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Disposition
Volume MCF
6. Sold
100, 816
Pool Name
Pool Code
Percent
7. Reinjected
7,891,464
Prudhoe Bay, Niakuk Oil
640148
0.4%
Prudhoe Bay, Lisburne Oil
640144
63.6%
8. Flared or vented 1 hour or less
0
Prudhoe Bay, Pt Mcint re Oil
640180
22.8%
Prudhoe Bay, Prudhoe Oil
640150
10.4%
9. Flared or vented more than 1 hour (see instr.)
2,437
Prudhoe Bay, Raven Oil
640147
1.3%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
11,468
Prudhoe Bay, Sag Riv Undef
640165
1.6%
11. Assist Gas
133,254
12. Fuel gas used in lease operations.
737,397
13. Other (see instructions)
2,088,311
Official Use Only
Authorization >1 hr:
/o64
Safety
Y 2 7
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,965,147
15. NGL Gas Equivalent
100,816
Lease Use
MCF
Conservation
MCF0
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,900,158
n%
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,900,158
Pt McIntyre NGLs at CGF gas equivalent = 7,128
and Fuel Gas
from Prudhoe = 0
hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Note: All volumes must be corrected
Title Head of Control BP Alaska to pressure of 14.65 psia and to a
Printed Name David S. Knapp temperature of 60o F. Authority 20
Phone (907) 564-4694 Date AAC25.235.
Form 10-422 Rev. 5/2009
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
6/18/2019 11:10-13:55 328
6/29/2019 12:39-23:59 785
Total Flare > 1 Hour 1,113
Volume Flared 1,113
Measured Safety Pilot 7,099
Continuous Assist 84,723
TOTAL FLARED 92,935
STOP compressor shutdown due to regulator failure of X011
Repaired equipment malfunction, restarted
18## T/C and returned facility to normal
BESD Valve
U operation
Flaring was done because the plant had to
Had to SESD the plant due to shipping pump gas release and
SESD. Flaring stopped at times because the
fire.
U front end pressure was bled off to flare
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
6/18/2019 11:10-13:55 354
6/29/2019 12:39-23:59 849
Total Flare > 1 Hour 1,203
Volume Flared 1,203
Measured Safety Pilot 2,902
Continuous Assist 30,368
TOTAL FLARED 34,473
Repaired equipment malfunction, restarted
18## T/C and returned facility to normal
STOP compressor shutdown due to regulator failure of X011 U operation
Flaring was done because the plant had to
SESD. Flaring stopped at times because the
Had to SESD the plant due to shipping pump gas release and fi U front end pressure was bled off to flare
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
DATE TIME cf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
6/18/2019 11:10-13:55
6/29/2019 12:39-23:59
Total Flare > 1 Hour 6
Volume Flared 6
Measured Safety Pilot 46
Continuous Assist 563
TOTALFLARED 615
STOP compressor shutdown due to regulator failure of X011
BESD Valve
Had to SESD the plant due to shipping pump gas release and
fire.
Repaired equipment malfunction, restarted
18## T/C and returned facility to normal
U operation
Flaring was done because the plant had to
SESD. Flaring stopped at times because the
U front end pressure was bled off to flare
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED AC71ON TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
STOP compressor shutdown due to regulator failure of X011
6/18/2019 11:10-13:55 12 BESD Valve
6/29/2019 12:39-23:59 28 Had to SESD the plant due to shipping pump gas release and
fire.
Total Flare > 1 Hour
40
Volume Flared
40
Measured Safety Pilot
311
Continuous Assist
3,773
TOTAL FLARED
4,124
Repaired equipment malfunction, restarted
18## T/C and returned facility to normal
operation
Flaring was done because the plant had to
SESD. Flaring stopped at times because the
front end pressure was bled off to flare
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare - I Hour
STV/IP compressor shutdown due to regulator failure of X011 Repaired equipment malfunction, restarted
6/18/2019 11:10-13:55 22 BESD Valve 184t# T/C and returned facility to normal
U operation
Had to SESD the plant due to shippin Flaring was done because the plant had to
6/29/2019 12:39-23:59 53 fire. i Pump gas release and
SESD. Flaring stopped at times because the
U front end pressure was bled Off to flare
Total Flare > 1 Hour 75
Volume Flared 7S
Measured Safety Pilot 11110
Continuous Assist 13,827
TOTAL FLARED 1012
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED
TO
Total Flare <=1 Hour O
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-19
VOLUME
DATE TIME (MSCF
) DESCRIPTION OF INCIDENTS &CAUSE PLANNED
w1YmcU ACTION TAKEN TO ELIMINATE
Total Flare c=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
IPBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
IBP
5. MonthNear of Disposition
Jul -2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
43,049
Pool Name
Pool Code
Percent
7. Reinjected
7,269,103
Prudhoe Bay, Lisburne Oil
640144
69.6%
Prudhoe Bay, Niakuk Oil
640148
0.7%
8. Flared or vented 1 hour or less
5,444
Prudhoe Bay, Pt Mcint re Oil
640180
17.1 %
Prudhoe Bay, Prudhoe Oil
640150
10.9%
9. Flared or vented more than 1 hour (see instr.)
12
Prudhoe Bay, Raven Oil
640147
1.0%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
11,680
Prudhoe Bay, Sag Riv Undef
640165
0.8%
11. Assist Gas
86,517
12. Fuel gas used in lease operations.
560,265
13. Other (see instructions)
1,121, 830
Official Use Only
Authorization >1 hr:
q�Z�g
Safety
(
MCF
14. TOTAL VOLUME (ITEMS 6-12)
9,097,900
Lease Use
MCF
15. NGL Gas Equivalent
43,049
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,603,102
y `
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,603,102 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 7,716
I hereby certify:th:atthe foregoing is true a corre t 4he best of my knowledge.
Manager - Production, Royalty and Tax Note: All volumes must be corrected
Signature Title Compliance Alaska to pressure of 14.65 psia and to a
Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20
/ '? AAC25.235.
Form 10-422 Rev. 5/2009 INCTRI Ir TIr1NC r)K1 RCVC0cC cinr
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/3/2019
12:49-13:29
185 P
7/6/2019
14:53-14:54
23 P
7/7/2019
15:09-15:41
7 P
7/16/2019
10:29-10:30
0 U
7/16/2019
14:25-14:26
0 U
7/20/2019
13:54-14:22
548 U
7/20/2019
13:56-14:23
12 U
7/20/2019
21:33-21:37
18 U
7/20/2019
21:45-21:47
11 U
7/20/2019
22:14-22:45
82 U
7/21/2019
12:02-12:16
3 U
7/21/2019
17:04-17:06
12 U
7/22/2019
3:24-3:25
0 U
Total Flare <=1 Hour
901
7/9/2019
13:19-14:20
2 Low Pressure FG shut us down. U
Total Flare > 1 Hour 2
Volume Flared 903
Measured Safety Pilot 1,869
Continuous Assist 10,501
TOTAL FLARED 13,273
Completed troubleshooting, reloaded 1800
T/C and stablized facility process and
operation
VOLUME
DATE TIME
7/3/2019 12:49-13:29 805
7/6/2019 14:53-14:54 100
7/7/2019 15:09-15:41 32
7/16/2019 10:29-10:30 1
7/16/2019 14:25-14:26 1
7/20/2019 13:54-14:22 2,387
7/20/2019 13:56-14:23 50
7/20/2019 21:33-21:37 81
7/20/2019 21:45-21:47 47
7/20/2019 22:14-22:45 358
7/21/2019 12:02-12:16 12
7/21/2019 17:04-17:06 54
7/22/2019 3:24-3:25 1
Total Flare <=1 Hour 3,929
7/9/2019 13:19-14:20 9
Total Flare > 1 Hour 9
Volume Flared
3,938
Measured Safety Pilot
7,990
Continuous Assist
62,066
TOTAL FLARED
73,994
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
PLANNED
DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
P
P
P
U
U
U
U
U
U
U
U
U
U
Completed troubleshooting, reloaded 1800
T/C and stablized facility process and
Low Pressure FG shut us down. U operation
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE
7/3/2019
12:49-13:29
104 P
7/6/2019
14:53-14:54
13 P
7/7/2019
15:09-15:41
4 P
7/16/2019
10:29-10:30
0 U
7/16/2019
14:25-14:26
0 U
7/20/2019
13:54-14:22
309 U
7/20/2019
13:56-14:23
7 U
7/20/2019
21:33-21:37
10 U
7/20/2019
21:45-21:47
6 U
7/20/2019
22:14-22:45
46 U
7/21/2019
12:02-12:16
1 U
7/21/2019
17:04-17:06
7 U
7/22/2019
3:24-3:25
0 U
Total Flare <=1 Hour
507
7/9/2019 13:19-14:20 1
Total Flare > 1 Hour
Volume Flared 508
Measured Safety Pilot
1,596
Continuous Assist
11,916
TOTAL FLARED
14,020
Low Pressure FG shut us down.
Completed troubleshooting, reloaded 1800
T/C and stablized facility process and
U operation
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare —1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
VOLUME
DATE TIME
7/3/2019 12:49-13:29 8
7/6/2019 14:53-14:54 1
7/7/2019 15:09-15:41 0
7/16/2019 10:29-10:30 0
7/16/2019 14:25-14:26 0
7/20/2019 13:54-14:22 24
7/20/2019 13:56-14:23 1
7/20/2019 21:33-21:37 1
7/20/2019 21:45-21:47 0
7/20/2019 22:14-22:45 4
7/21/2019 12:02-12:16 0
7/21/2019 17:04-17:06 1
7/22/2019 3:24-3:25 0
Total Flare <=1 Hour 40
7/9/2019 13:19-14:20 0
Total Flare > 1 Hour 0
Volume Flared
40
Measured Safety Pilot
65
Continuous Assist
515
TOTAL FLARED
620
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
DESCRIPTION OF INCIDENTS & CAUSE
Low Pressure FG shut us down.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
P
P
P
U
U
U
U
U
U
U
U
U
U
Completed troubleshooting, reloaded 1800
T/C and stablized facility process and
U operation
VOLUME
DATE TIME
7/3/2019 12:49-13:29 14
7/6/2019 14:53-14:54 1
7/7/2019 15:09-15:41 1
7/16/2019 10:29-10:30 0
7/16/2019 14:25-14:26 0
7/20/2019 13:54-14:22 41
7/20/2019 13:56-14:23 1
7/20/2019 21:33-21:37 1
7/20/2019 21:45-21:47 1
7/20/2019 22:14-22:45 6
7/21/2019 12:02-12:16 0
7/21/2019 17:04-17:06 1
7/22/2019 3:24-3:25 0
Total Flare <=1 Hour 67
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-19
DESCRIPTION OF INCIDENTS & CAUSE
7/9/2019 13:19-14:20 0 Low Pressure FG shut us down.
Total Flare > 1 Hour 0
Volume Flared
67
Measured Safety Pilot
160
Continuous Assist
1,519
TOTAL FLARED
1,746
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE
P
P
P
U
U
U
U
U
U
U
U
U
U
Completed troubleshooting, reloaded 1800
T/C and stablized facility process and
U operation
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
IPBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
1BP
5. MonthNear of Disposition
I Au ust-2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
84,696
Pool Name
Pool Code
Percent
7. Reinjected
7,925,444
Prudhoe Bay, Lisburne Oil
640144
50.8%
Prudhoe Bay, Niakuk Oil
640148
0.2%
8. Flared or vented 1 hour or less
1,052
Prudhoe Bay, Pt Mcint re Oil
640180
36.8%
Prudhoe Bay, Prudhoe Oil
640150
10.9%
9. Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bay, Raven Oil
640147
0.6%
Prudhoe Bay, W Beach Oil
640186
0.0%
10. Pilot and Purge
11,591
Prudhoe Bay, W Bch Tr Un
640187
0.0%
11. Assist Gas
89,894
12. Fuel gas used in lease operations.
641,196
13. Other (see instructions)
1,330,074
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,083,947
Lease Use
MCF
15. NGL Gas Equivalent
84,696
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,178,533
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,178,533 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 5,579
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Manager - Production, Royalty and Tax Note: All volumes must be corrected
Signature Title Compliance Alaska to pressure of 14.65 psia and to a
Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE c„ti ;. ;., r,....u,,. -
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/24/2019
3:11-3:15
47
8/24/2019
7:25-7:26
2
8/24/2019
8:48-8:49
2
8/24/2019
8:49-8:50
2
8/24/2019
20:44-20:51
17
8/25/2019
3:07-3:26
76
8/27/2019
12:03-12:16
44
8/27/2019
5:24-5:25
4
Total Flare <= 1 Hour 194
Total Flare > 1 Hour
0
Volume Flared
194
Measured Safety Pilot
1,442
Continuous Assist
11,904
TOTAL FLARED
13,540
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/24/2019
3:11-3:15
112
8/24/2019
7:25-7:26
5
8/24/2019
8:48-8:49
5
8/24/2019
8:49-8:50
5
8/24/2019
20:44-20:51
41
8/25/2019
3:07-3:26
180
8/27/2019
12:03-12:16
104
8/27/2019
5:24-5:25
10
Total Flare <= I Hour 462
Total Flare > 1 Hour
Volume Flared 462
Measured Safety Pilot 5,713
Continuous Assist 43,500
TOTAL FLARED 49,675
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/24/2019
3:11-3:15
94 p
8/24/2019
7:25-7:26
4 p
8/24/2019
8:48-8:49
4 p
8/24/2019
8:49-8:50
4 p
8/24/2019
20:44-20:51
35 p
8/25/2019
3:07-3:26
152 p
8/27/2019
12:03-12:16
87 p
8/27/2019
5:24-5:25
8 p
Total Flare <=1 Hour 388
Total Flare > 1 Hour 0
Volume Flared 388
Measured Safety Pilot 4,280
Continuous Assist 33,348
TOTAL FLARED 38,016
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/24/2019
3:11-3:15
8/24/2019
7:25-7:26
8/24/2019
8:48-8:49
8/24/2019
8:49-8:50
8/24/2019
20:44-20:51
8/25/2019
3:07-3:26
8/27/2019
12:03-12:16
8/27/2019
5:24-5:25
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared 1
Measured Safety Pilot 24
Continuous Assist 166
TOTALFLARED 191
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME
DATE TIME
(Mstf) DESCRIPTION OF INCIDENTS &CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/24/2019 3:11-3:15
2
8/24/2019 7:25-7:26
0
P
8/24/2019 8:48-8:49
0
P
8/24/2019 8:49-8:50
0
P
8/24/2019 20:44-20:51
1
P
8/25/2019 3:07-3:26
2
P
8/27/2019 12:03-12:16
2
P
8/27/2019 5:24-5:25
0
P
P
Total Flare <= 1 Hour
7
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 132
Continuous Assist 976
TOTAL FLARED 1,115
SP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED
u
ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Fiore c=1 Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
1PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
IBP
5. MonthNear of Disposition
I Se tember-2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume,
6. Sold
104,576
Pool Name
Pool Code
Percent
7. Reinjected
7,968,041
Prudhoe Bay, Lisburne Oil
640144
63.4%
Prudhoe Bay, Niakuk Oil
640148
0.2%
8. Flared or vented 1 hour or less
938
Prudhoe Bay, Pt MCint re Oil
640180
25.0%
Prudhoe Bay, Prudhoe Oil
640150
10.2%
9. Flared or vented more than 1 hour (see instr.)
20,470
Prudhoe Bay, Raven Oil
640147
0.5%
Prudhoe Bay, W Bch Tr Un
640187
0.0%
10. Pilot and Purge
11,313
Prudhoe Bay, W Beach Oil
640186
0.0%
11. Assist Gas
95,352
12. Fuel gas used in lease operations.
649,002
13. Other (see instructions)
1,641,762
Official Use Only
Authorization >1 hr:
Safety
2 y 7CJ
MCF
14. TOTAL VOLUME (ITEMS 6-12)
10,491,454
Lease Use
MCF
15. NGL Gas Equivalent
104,576
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,128,102
tt Z3
Commissioner D to
18. Transferred to (Express as a negative #)
O
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,128,102 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 6,479
1 hereby certify that the foregoing is true an orrec;Ao �he best of my knowledge.
Manager - Production, Royalty and Tax Note: All volumes must be corrected
Signature Title Compliance Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mark Littlefield Phone (907) 564-5775 Date Q Zc% 5 AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Dunlicato
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE
TIME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2019
15:26-15:27
19
9/1/2019
17:40-17:43
25
P
9/2/2019
18:08-18:09
58
P
9/3/2019
14:17-14:20
180
U
9/21/2019
13:40-13:41
0
U
9/25/2019
15:40-16:25
199
P
P
Total Flare <=1 Hour 481
9/10/2019 18:10-22:28 15,810
9/24/2019 22:57-23:59 107
9/25/2019 00:01-2:38 505
Total Flare > 1 Hour
16,422
Volume Flared
16,903
Measured Safety Pilot
6,998
Continuous Assist
59,233
TOTALFLARED
83,134
1807 Reinjection compressor shutdown because of
control/instrumentation
The gas out valve (P001) failed and went closed, causing the
pressure in the drum to rise until it reached the point that the
flare valve opened (not the PSV)
I HIS IS d 4UrItI1IUdtl UII UI yeSlerUdy S Ildre eVerll... Same event, IL
just rolled past midnight. The gas out valve (P001) failed and
went closed, causing the pressure in the drum to rise until it
reached the point that the flare valve opened (not the PSV)
Field production was cut to lower gas
U production until 1807 T/C restarted
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
9/1/2019 15:26-15:27 3
9/1/2019 17:40-17:43 4
9/2/2019 18:08-18:09 9
9/3/2019 14:17-14:20 30
9/21/2019 13:40-13:41 0
9/25/2019 15:40-16:25 33
Total Flare <=1 Hour 79
1807 Reinjection compressor shutdown because of
09/10/19 18:10-22:28 2,604 control/instrumentation
The gas out valve (P001) failed and went closed, causing the
pressure in the drum to rise until it reached the point that the
09/24/19 22:57-23:59 17 flare valve opened (not the PSV)
11ID O d can Ll WdHun ui yeb Lewdy ] IIdre even L... Jdrlle even L,
it just rolled past midnight. The gas out valve (P001) failed
and went closed, causing the pressure in the drum to rise
09/25/19 00:01-2:38 83 until it reached the point that the flare valve opened (not the
Total Flare > 1 Hour
2,704
Volume Flared
21783
Measured Safety Pilot
2,890
Continuous Assist
24,162
TOTALFLARED
29,835
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE
P
P
U
U
P
P
Field production was cut to lower gas
U production until 1807 T/C restarted
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE
TIME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2019
15:26-15:27
0
9/1/2019
17:40-17:43
0
P
9/2/2019
18:08-18:09
0
P
9/3/2019
14:17-14:20
1
U
9/21/2019
13:40-13:41
0
U
9/25/2019
15:40-16:25
1
P
P
Total Flare <=1 Hour 2
09/10/19 18:10-22:28 51
09/24/19 22:57-23:59 0
09/25/19 00:01-2:38 2
Total Flare > 1 Hour 53
Volume Flared 55
Measured Safety Pilot 20
Continuous Assist 174
TOTAL FLARED 249
1807 Reinjection compressor shutdown because of
control/instrumentation
The gas out valve (P001) failed and went closed, causing the
pressure in the drum to rise until it reached the point that the
flare valve opened (not the PSV)
I Il1b q d WrlUnUdLIUn UI yebLeWdy 5 IIdre even L... DdrrIe eVeIIL,
it just rolled past midnight. The gas out valve (P001) failed
and went closed, causing the pressure in the drum to rise
until it reached the point that the flare valve opened (not the
Field production was cut to lower gas
U production until 1807 T/C restarted
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE
TIME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/l/2019
15:26-15:27
1
9/1/2019
17:40-17:43
1
P
9/2/2019
18:08-18:09
1
P
9/3/2019
14:17-14:20
3
U
9/21/2019
13:40-13:41
0
U
9/25/2019
15:40-16:25
4
P
P
Total Fiore <=1 Hour 10
09/10/19 18:10-22:28 322
09/24/19 22:57-23:59 2
09/25/19 00:01-2:38 10
Total Flare> 1 Hour 334
Volume Flared 344
Measured Safety Pilot 134
Continuous Assist 1,132
TOTAL FLARED 1,610
1807 Reinjection compressor shutdown because of
control/instrumentation
The gas out valve (P001) failed and went closed, causing the
pressure in the drum to rise until it reached the point that the
flare valve opened (not the PSV)
111O IS a CUm riudoun u, yebWfUdy b Ildle evefl L...Salile event,
it just rolled past midnight. The gas out valve (Pool) failed
and went closed, causing the pressure in the drum to rise
until it reached the point that the flare valve opened (not the
Field production was cut to lower gas
U production until 1807 T/C restarted
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 229
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE
TIME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1/2019
15:26-15:27
1
9/1/2019
17:40-17:43
2
P
9/2/2019
18:08-18:09
5
P
9/3/2019
14:17-14:20
14
U
9/21/2019
13:40-13:41
0
U
9/25/2019
15:40-16:25
16
P
P
Total Flare <=1 Hour
38
09/10/19 18:10-22:28
1807 Reinjection compressor shutdown because of
1,238
control/instrutmentaon
The gas out valve (P001) failed and went closed, causing the
09/24/19 22:57-23:59
pressure in the drum to rise until it reached the point that the
8 flare valve opened (not the P5V)
I nlb Ib d LUrIU11UdL1UII UI yebLefUdy b Ildre eVeflt... bdlne eVeDL, IL
just rolled past midnight. The gas out valve (P001) failed and
09/25/19 00:01-2:38
went closed, causing the pressure in the drum to rise until it
39
reached the point that the flare valve opened (not the PSV)
Total Flare > 1 Hour 1,285
Volume Flared 1,323
Measured Safety Pilot 1,271
Continuous Assist 10,651
TOTAL FLARED 13,245
Field production was cut to lower gas
U production until 1807 T/C restarted
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
Inst techs were called out and they got the
valve opening. Valve will be fully repaired
U tomorrow.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS CAUSE PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= I Hour p
Total Flare > I Hour
Volume Flared U
Measured Safety Pilot p
Continuous Assist p
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED
UNPLANNcn Ar-r,—..
�CLimiNATE CAUSE
Total Flare - I Hour 0
Total Flare > 1 Hour
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 2. Facility Name 3 Field 4 O
0290000009
PBU LISBURNE PROD GPMA
PBU -GPMA
Volume MCF
Aerator 5. Near of Disposition
BP October-2019
20. For production from multiple pools, list contribution of each pool as a percent of
Disposition
6. Sold
110,187
Total Volume.
Pool Name
Pool Code Percent
7. Reinjected
8,868,786
Prudhoe Bay, Lisburne Oil
640144
64.0%
Prudhoe Bay, Niakuk Oil
640148
0.2%
8. Flared or vented 1 hour or less
595
Prudhoe Bay, Pt Mcint re Oil
640180
26.0%
Prudhoe Bay, Prudhoe Oil
640150
8.5%
9. Flared or vented more than 1 hour (see instr.)
558
Prudhoe Bay, Raven Oil
640147
0.6%
Prudhoe Bay, W Bch Tr Un
640187
0.0%
10. Pilot and Purge
11,830
Prudhoe Bay, W Beach Oil
640186
0.0%
11. Assist Gas
100,300
12. Fuel gas used in lease operations.
777,486
13. Other (see instructions)
1,779,329
Official Use Only
Authorization >1 hr:
Safety
���
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,649,071
Lease Use
MCF
15. NGL Gas Equivalent
110,187
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,290,395
`
18. Transferred to: (Express as a negative #)
0
Commissioner
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,290,395 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 7,646
hereby certify that the foregoing is tr a and correct to the best of my knowledge.
Signature
Manager - Production, Royalty and Tax Note: All volumes must be corrected
w Title Compliance Alaska
to pressure of 14.65 psia and to a
Printed Name Mark Littlefield temperature of 60o F. Authority 20
Phone (907) 564.5775 Date // E3 Zr AAC25.235
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME
PLANNED
DATE
TIME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/21/2019
4:09-4:13
156
10/21/2019
7:37-8:09
224
U
10/22/2019
2:45-3:34
13
U
U
Total Flare <=1 Hour 393
1808 Reinjection compressor shutdown because of Repaired equipment malfunction, restarted
control/instrumentation failure associated with P024 FG 1808 T/C and returned facility to normal
10/20/2019 7:17-16:33 346 Control Value. U operations
Plant shutdown because of field wide power outage.
Operations shutdown facility in response. This was the amount Flare valves closed after plant shutdown was
10/21/2019 7:39-13:16 22 flared through the LP Flare U complete
Total Flare > 1 Hour 368
Volume Flared 761
Measured Safety Pilot
7,605
Continuous Assist
64,517
TOTALFLARED
72,883
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME
PLANNED
DATE
TIME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/21/2019
4:09-4:13
57
10/21/2019
7:37-8:09
82
U
10/22/2019
2:45-3:34
5
U
U
Total Flare <=1 Hour 144
10/20/2019 7:17-16:33 125
10/21/2019 7:39-13:16 8
Total Flare > 1 Hour 133
Volume Flared 277
Measured Safety Pilot
3,036
Continuous Assist
25,724
TOTAL FLARED
29,037
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with P024 FG
Control Value.
Plant shutdown because of field wide power outage.
Operations shutdown facility in response. This was the
amount flared through the LP Flare
Repaired equipment malfunction, restarted
1808 T/C and returned facility to normal
U operations
Flare valves closed after plant shutdown was
U complete
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME
PLANNED
DATE
TIME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/21/2019
4:09-4:13
0
10/21/2019
7:37-8:09
0
U
10/22/2019
2:45-3:34
0
U
U
Total Flare c=1 Hour 0
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with P024 FG
10/20/2019 7:17-16:33 1 Control Value.
Plant shutdown because of field wide power outage.
Operations shutdown facility in response. This was the
10/21/2019 7:39-13:16 0 amount flared through the LP Flare
Total Flare > 1 Hour 1
Volume Flared 1
Measured Safety Pilot
28
Continuous Assist
238
TOTAL FLARED
267
Repaired equipment malfunction, restarted
1808 T/C and returned facility to normal
U operations
Flare valves closed after plant shutdown was
U complete
VOLUME
DATE
TIME
(Ms
10/21/2019
4:09-4:13
4
10/21/2019
7:37-8:09
5
10/22/2019
2:45-3:34
0
Total Flare <=1 Hour 9
10/20/2019 7:17-16:33 8
10/21/2019 7:39-13:16 1
Total Flare > 1 Hour
9
Volume Flared
18
Measured Safety Pilot
152
Continuous Assist
1,285
TOTAL FLARED
1,455
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
L15BURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Ott-19
DESCRIPTION OF INCIDENTS & CAUSE
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with P024 FG
Control Value.
Plant shutdown because of field wide power outage.
Operations shutdown facility in response. This was the
amount flared through the LP Flare
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
U
U
U
Repaired equipment malfunction, restarted
1808 T/C and returned facility to normal
U operations
Flare valves closed after plant shutdown was
U complete
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME
PLANNED
DATE
TIME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/21/2019
4:09-4:13
19
10/21/2019
7:37-8:09
29
U
10/22/2019
2:45-3:34
1
U
U
Total Flare <=1 Hour 49
1808 Reinjection compressor shutdown because of
control/instrumentation failure associated with P024 FG
10/20/2019 7:17-16:33 44 Control Value.
Plant shutdown because of field wide power outage.
Operations shutdown facility in response. This was the amount
10/21/2019 7:39-13:16 3 flared through the LP Flare
Total Flare > 1 Hour 47
Volume Flared 96
Measured Safety Pilot
1,009
Continuous Assist
8,536
TOTAL FLARED
9,641
Repaired equipment malfunction, restarted
1808 T/C and returned facility to normal
U operations
Flare valves closed after plant shutdown was
U complete
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO.219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME
DATE rl✓ .-cu
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare> 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour p
Total Flare > 1 Hour
Volume Flared p
Measured Safety Pilot p
Continuous Assist p
TOTALFLARED 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator .5.
BP
Month/Year of Disposition
I November-2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
132,363
Pool Name
Pool Code
Percent
7. Reinjected
8,875,104
Prudhoe Bay,Lisburne Oil
640144
72.0%
Prudhoe Bay,Niakuk Oil
640148
0.2%
8. Flared or vented 1 hour or less
0
Prudhoe Bay,Pt Mcint re Oil
640180
18.4%
Prudhoe Bay,Prudhoe Oil
640150
8.2%
9. Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bav, Raven Oil
640147
0.6%
Prudhoe Bay, W Bch Tr Un
640187
0.0%
10. Pilot and Purge
11,495
Prudhoe Bay, W Beach Oil
640186
0.0%
11, Assist Gas
95,255
12. Fuel gas used in lease operations.
799,246
13. Other (see instructions)
2,066,164
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
11,979,627
Lease Use
MCF
15. NGL Gas Equivalent
132,363
Conservation
MCF
16. Purchased gas
Waste:
MCF
17. Transferred from:
1,017,964
Commissioner Date
18. Transferred to: (Express as a negative #)
0
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = L017,964 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true and rect t th est of my knowledge.
Note: All volumes must be corrected
Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a
temperature of 60o F. Authority 20
Printed Name Phone (907) 564-5775 Date 1 -ve, AAC25.235.
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVFRSF ,,InF
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 966
Continuous Assist 8,048
TOTAL FLARED 9,014
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
28
Continuous Assist
228
TOTALFLARED
256
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Fiore > 1 Hour
0
Volume Flared
0
Measured Safety Pilot
2,108
Continuous Assist
17,496
TOTAL FLARED
19,604
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared
0
Measured Safety Pilot
135
Continuous Assist
1,120
TOTAL FLARED
1,255
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <= 1 Hour p
Total Flare > 1 Hour p
Volume Flared
U
Measured Safety Pilot
8,258
Continuous Assist
68,363
TOTALFLARED
76,621
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (MSCF
DESCRIPTION OF INCIDENTS & CAUSE
Total flare <=1 Hour 0
Total Flare> 1 Hour 0
Volume Flared
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD GPMA
3. Field
PBU - GPMA
4. Operator
BP
5. MonthNear of Disposition
I December-2019
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
146,069
Pool Name
Pool Code
Percent
7. Reinjected
9,832,386
Prudhoe Bay,Lisburne Oil
640144
70.5%
Prudhoe Bay,Niakuk Oil
640148
0.3%
8. Flared or vented 1 hour or less
0
Prudhoe Bay,Pt Mcint re Oil
640180
23.6%
Prudhoe Bay,Prudhoe Oil
640150
4.8%
9. Flared or vented more than 1 hour (see instr.)
0
Prudhoe Bay,Raven Oil
640147
0.3%
Prudhoe Bay, W Bch Tr Un
640187
0.0%
10. Pilot and Purge
11,899
Prudhoe Bay, W Beach Oil
640186
0.0%
11. Assist Gas
106,485
12. Fuel gas used in lease operations.
851,352
13. Other (see instructions)
2,026,525
Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-12)
12,974,716
Lease Use
MCF
15. NGL Gas Equivalent
146,069
Conservation
MCF
16. Purchased gas
0
Waste:
MCF
17. Transferred from:
1,443,803
18. Transferred to: (Express as a negative #)
0
Commissioner Date
19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,443,803 and Fuel Gas from Prudhoe = 0
1 hereby certify that the foregoing is true an correct �q/he best of my knowledge.
Note: All volumes must be corrected
Signature Title Manaqer Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
Printed Name Mark Littlefield Phone (907) 564-5775 Date / ,—zow"' AAC25.235.
Form 10-422 Rev. 5/2009 INSTRt1CTIONS nN RFVFRSF .oinF c„h—if ;., n,, r
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 8,389
Continuous Assist 74,946
TOTAL FLARED 83,335
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <=1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 36
Continuous Assist 326
TOTAL FLARED 362
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME
PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot 2,799
Continuous Assist 25,186
TOTAL FLARED 27,985
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 107
Continuous Assist 955
TOTAL FLARED 1,062
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare c=1 Hour 0
Total Flare > I Hour 0
Volume Flared 0
Measured Safety Pilot 568
Continuous Assist 5,072
TOTAL FLARED 5,640
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
DATE TIME VOLUME
(MSCF
DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour 0
Total Flare> 1 Hour 0
Volume Flared -
0
Measured Safety Pilot 0
Continuous Assist 0
TOTALFLARED
0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-19
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
Total Flare <=1 Hour p
Total Flare > 1 Hour p
Volume Flared 0
Measured Safety Pilot D
Continuous Assist U
TOTALFLARED D
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE