Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GMPA) - BP Exploration (Alaska), Inc.STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 12. Facility Name IPBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 5. MonthNear of Disposition Disposition Volume MCF BP Janua -2019 20. For production from multiple pools, list contribution of each pool as a percent of 6. Sold 109,903 Total Volume. Pool Name Pool Code Percent 7. Reinjected 10,656,000 Prudhoe Bay,Lisburne Oil 640144 61.7% Prudhoe Bay,Niakuk Oil 640148 0.3% 8. Flared or vented 1 hour or less 0 Prudhoe Bay,Pt Mcint re Oil 640180 33.7% Prudhoe Bay,Prudhoe Oil 640150 2.9% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bay,Raven Oil 640147 1.4% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 12,001 Prudhoe Bay, N Prudhoe Bay 640152 0.0% 11. Assist Gas 106,989 12. Fuel gas used in lease operations. 875,450 13. Other (see instructions) 2,490,995 Official Use Only Authorization >1 hr: MCF 14. TOTAL VOLUME (ITEMS 6-12) 14,251,338 Safety 15. NGL Gas Equivalent 109,903 Lease Use MCF 16. Purchased gas Conservation MCF 0 Waste: MCF 17. Transferred from: 1,901,373 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,901,373 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas equivalent) = 18,272 I hereby certify that oregoing is true and c rect to the best of my knowledge. Signature Title Head of Control BP Alaska Note: All volumes must be corrected to pressure of 14.65 psia and to a Printed Name David S. Kna temperature of 600 F. Authority 20 pp Phone (907) 564-4694 Date Z 9 n nr+)c noc Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSF cinF BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared Measured Safety Pilot 7,403 Continuous Assist 65,811 TOTAL FLARED 73,214 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 4,057 Continuous Assist 35,928 TOTAL FLARED 39,985 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 42 Continuous Assist 362 TOTALFLARED 404 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE VOLUME DATE TIME Total Flare <= 1 Hour Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 167 Continuous Assist 1,494 TOTAL FLARED 1,661 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare —1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 332 Continuous Assist 3,394 TOTAL FLARED 3,726 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 9, CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 0290000009 PBU LISBURNE PROD GPMA Disposition 3. Field PBU - GPMA Volume MCF 4. Operator 5. MonthNear of Disposition BP I Februa -2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 120,911 Pool Name Pool Code Percent 7. Reinjected 9,992,020 Prudhoe BaV, Lisburne Oil 640144 58.9% Prudhoe Bay,Niakuk Oil 640148 0.4% 8. Flared or vented 1 hour or less 371 Prudhoe Bay,Pt Mcint re Oil 640180 37.8% Prudhoe Bay,Prudhoe Oil 640150 1.6% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bay,Raven Oil 640147 1.2% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 10,809 Prudhoe BaV, N Prudhoe PaL 640152 0.0% 11. Assist Gas 86,925 12. Fuel gas used in lease operations. 789,369 13. Other (see instructions) 1,784, 336 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,784,741 Lease Use MCF 15. NGL Gas Equivalent 120,911 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 2,067,553 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,067,553 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas equivalent) = 14,871 f hereby certify tha foregoing is true and corre to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a Printed Name David S. Knapp Phone (907) 564-5775 Date temperature of 60o F. Authority 20 AA Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 2/3/2019 07:07 - 08:00 229 Not required for events < 1 hour Total Flare <= 1 Hour 229 Total Flare > 1 Hour 0 Volume Flared 229 Measured Safety Pilot 6,356 Continuous Assist 51,118 TOTAL FLARED 57,703 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U Not required for events < 1 hour VOLUME BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/3/2019 07:07 - 08:00 5 Not required for events < 1 hour U Not required for events < 1 hour Total Flare <=1 Hour 5 Total Flare > 1 Hour 0 Volume Flared 5 Measured Safety Pilot 178 Continuous Assist 1,426 TOTAL FLARED 1,609 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 2/3/2019 07:07 - 08:00 131 Not required for events < 1 hour Total Flare <=1 Hour 131 Total Flare > 1 Hour Volume Flared 131 Measured Safety Pilot 4,102 Continuous Assist 32,986 TOTAL FLARED 37,219 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for events < 1 hour VOLUME DATE TIME (Ms 2/3/2019 07:07 - 08:00 1 Total Flare <=1 Hour 1 Total Flare > 1 Hour 0 Volume Flared 1 Measured Safety Pilot 40 Continuous Assist 321 TOTALFLARED 362 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 DESCRIPTION OF INCIDENTS & CAUSE Not required for events < 1 hour PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U Not required for events < 1 hour VOLUME DATE TIME 2/3/2019 07:07 - 08:00 Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 133 Continuous Assist 1,074 TOTAL FLARED 1,212 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-19 DESCRIPTION OF INCIDENTS & CAUSE Not required for events < 1 hour PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Not required for events < 1 hour STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. Month/Year of Disposition I March-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 135,863 Pool Name Pool Code Percent 7. Reinjected 11,339,185 Prudhoe Bay,Lisburne Oil 640144 65.1 % Prudhoe Bay,Niakuk Oil 640148 0.2% 8. Flared or vented 1 hour or less 0 Prudhoe Bay,Pt Mcint re Oil 640180 27.7% Prudhoe Bay,Prudhoe Oil 640150 6.0% 9. Flared or vented more than 1 hour (see instr.) 15 Prudhoe Bay,Raven Oil 640147 1.0% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 11,867 Prudhoe Bay, N Prudhoe Bay 640152 0.0% 11. Assist Gas 111,488 12. Fuel gas used in lease operations. 882,487 13. Other see instructions ( ) 1,882,559 Official Use Only Authorization>1 hr. `�f' Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 14,363,464 Lease Use MCF 15. NGL Gas Equivalent 135,863 Conservation MCF 16. Purchased gas 0 Waste: JMCF 17. Transferred from: 2,243,276 p q Commissioner DAte 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,243,276 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas eugivalent) = 18,226 1 hereby certify that th foregoing is true a d collrect to the best of my knowledge. 1 Note: All volumes must be corrected Signature Title Head of Control, BP Alaska to pressure of 14.65 psia and to a Printed Name David S. Knapp Phone (907) 564-5775 Date temperature of 60o F. Authority 20AAC25.235. Form 10-422 Rev. 5/2009 iNCTPI 1(`T1r)KM nni rnGVGocG cinC: BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 During phase 2 weather conditions at the LPC, the liquid pit pilots 3/22/2019 15:30 -21:30 11 became extinguished and there was cold venting of gas. Total Flare > 1 Hour 11 Volume Flared 11 Measured Safety Pilot 7,738 Continuous Assist 72,796 TOTAL FLARED 80,545 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Isolate the liquid flare. Remove snow and U put flare back in service. VOLUME DATE TIME Total Flare <=1 Hour 0 3/22/2019 15:30 -21:30 3 Total Flare > 1 Hour 3 Volume Flared 3 Measured Safety Pilot 3,271 Continuous Assist 30,552 TOTAL FLARED 33,826 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 DESCRIPTION OF INCIDENTS & CAUSE During phase 2 weather conditions at the LPC, the liquid pit pilots became extinguished and there was cold venting of gas. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Isolate the liquid flare. Remove snow and U put flare back in service. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 26 Continuous Assist 247 TOTALFLARED 273 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 118 Continuous Assist 1,108 TOTAL FLARED 1,226 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <= 1 Hour During phase 2 weather conditions at the LPC, the liquid pit pilots 3/22/2019 15:30 -21:30 1 became extinguished and there was cold venting of gas. Total Flare > 1 Hour 1 Volume Flared 1 Measured Safety Pilot 714 Continuous Assist 6,785 TOTAL FLARED 7,500 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Isolate the liquid flare. Remove snow and put flare back in service. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare —1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 12. Facility Name 3. Field 0290000009 PBU LISBURNE PROD GPMA PBU -GPMA 4. Operator 5. Month/Yearof Disposition BP Aril-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a er t f 6. Sold 126,460 p cen o Total Volume. 7. Reinjected 9,843,765 Pool Name Pool Code Percent Prudhoe Bay,Lisburne Oil Prudhoe Bay,Niakuk Oil Prudhoe Bay,Pt Mcint re Oil 640144 640148 640180 66.4% 0.4% 8. Flared or vented 1 hour or less 5 Prudhoe Bay,Prudhoe Oil 640150 26.9% 5.1 9. Flared or vented more than 1 hour (see instr.) 12,752 Prudhoe Bay,Raven Oil Prudhoe Bay, W Beach Oil Prudhoe Bay, Sag Riv Undef 640147 640186 0.5% 0.0% 10. Pilot and Purge 11,446 640165 0.8% 11. Assist Gas 134,068 12. Fuel gas used in lease operations. 837,612 13. Other (see instructions) 1,758,989 Official Use Only Authorization >1 hr: J(( Safety 752� MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,725,097 15. NGL Gas Equivalent Lease Use MCF 126,460 16. Purchased gas Conservation 0 Waste: 17. Transferred from: 1,356,401 y 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Otf Field; Block 17: MI from Prudhoe = 1,356,401 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF (gas equivalent = 15,146 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Note: All volumes must be corrected Title Head of Control BP Alaska to pressure of 14.65 psia and to a Printed Name David S. Knapp Phone (907) 564-5775 Date „ temperature of 600 F. Authority 20 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON RFVFRSiF cinF VOLUME DATE TIME 4/18/2019 17:26-17:40 3 Total Flare <=1 Hour 3 4/8/2019 15:15-16:54 9,138 Total Flare> 1 Hour 9,138 Volume Flared 9,141 Measured Safety Pilot 7,615 Continuous Assist 89,061 TOTAL FLARED 205,817 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 DESCRIPTION OF INCIDENTS & CAUSE 1807 reinjection compressor shutdown on 2nd stage nozzles not tracking set point. Battery charger is not working. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U Field production cut to lower gas production U until 1807 could be restarted. VOLUME DATE TIME (MS1 4/18/2019 17:26-17:40 2 Total Flare <= 1 Hour 2 4/8/2019 15:15 - 16:54 2,271 Total Flare > 1 Hour 2,271 Volume Flared 2,273 Measured Safety Pilot 3,060 Continuous Assist 36,002 TOTALFLARED 41,335 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 DESCRIPTION OF INCIDENTS & CAUSE 1807 reinjection compressor shutdown on 2nd stage nozzles not tracking set point. Battery charger is not working. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U Field production cut to lower gas production U until 1807 could be restarted. DATE TIME Total Flare <=1 Hour VOLUME 0 4/8/2019 15:15-16:54 57 Total Flare > 1 Hour 57 Volume Flared 57 Measured Safety Pilot 43 Continuous Assist S13 TOTALFLARED 613 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 DESCRIPTION OF INCIDENTS & CAUSE 1807 reinjection compressor shutdown on 2nd stage nozzles not tracking set point. Battery charger is not working. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Field production cut to lower gas production U until 1807 could be restarted. VOLUME DATE TIME Total Flare <=1 Hour 0 4/8/2019 15:15 - 16:54 320 Total Flare > 1 Hour 320 Volume Flared 320 Measured Safety Pilot 145 Continuous Assist 1,704 TOTALFLARED 2,169 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 DESCRIPTION OF INCIDENTS & CAUSE 1807 reinjection compressor shutdown on 2nd stage nozzles not tracking set point. Battery charger is not working. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Field production cut to lower gas production until 1807 could be restarted. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 VOLUME DATE TIME (MSCf) DESCRIPTION OF INCIDENTS & CAUSE Total flare <=1 Hour 1807 reinjection compressor shutdown on 2nd stage nozzles not 4/8/2019 15:15 - 16:54 966 tracking set point. Battery charger is not working. Total Flare > 1 Hour 966 Volume Flared 966 Measured Safety Pilot S83 Continuous Assist 6,788 TOTALFLARED 8,337 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Field production cut to lower gas production until 1807 could be restarted. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour p Total Flare > 1 Hour Volume Flared Measured Safety Pilot p Continuous Assist p TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour p Total Flare > 1 Hour p Volume Flared p Measured Safety Pilot p Continuous Assist p TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3 Field 0290000009 IPBU LISBURNE PROD GPMA PBU - GPMA 4. Operator BP 5. MonthNear of Disposition Ma Disposition Volume MCF -2019 20. For production from multiple pools, list contribution of each pool as a percent Of Total Volume. 6. Sold 127,680 Pool Name Pool Code Percent 7. Reinjected 9,325,585 Prudhoe Bay, Lisburne Oil 640144 57.6% Prudhoe Bay, Niakuk Oil 640148 0.6% 8. Flared or vented 1 hour or less 3 Prudhoe Bay, Pt Mcint re Oil 640180 28.3% Prudhoe Bay, Prudhoe Oil 640150 9.7% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bay, Raven Oil 640147 1.8% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 11,846 Prudhoe Bay, Sag Riv Undef 640165 2.0% 11. Assist Gas 147,839 12. Fuel gas used in lease operations. 821,594 13. Other (see instructions) 2,002,300 Official Use Only Authorization >1 hr: MCF Safety 14. TOTAL VOLUME (ITEMS 6-12) 12,436,847 Lease Use MCF 15. NGL Gas Equivalent 127,680 16. Purchased gas 0 Conservation MCF Waste: MCF 17. Transferred from: 1,636,536 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,636,536 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF gas equivalent = 11,969 hereby certify that th oing is true and correct to the best of my knowledge. Note: All volumes must be corrected Signature Title Head of Control BP Alaska to pressure of 14.65 psia and to a ) /', f�� temperature of 60o F. Authority 20 ( Printed Name David S. Knapp Phone 907 564 4694 Date I / AAC25.235. —.. 1 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/28/2019 17:23-17:24 Total Flare <=1 Hour Total Flare > 1 Hour 0 Volume Flared Measured Safety Pilot 6,813 Continuous Assist 85,032 TOTAL FLARED 91,847 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/28/2019 17:23-17:24 Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 3,349 Continuous Assist 41,795 TOTAL FLARED 45,145 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 68 Continuous Assist 849 TOTALFLARED 917 VOLUME DATE TIME Total Flare <= 1 Hour Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 456 Continuous Assist 5,691 TOTAL FLARED 6,147 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE VOLUME BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 1,160 Continuous Assist 14,472 TOTAL FLARED 15,632 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-19 VOLUME DATE TIME PLANNED (MSCF) DESCRIPTION OF INCIDENTS &CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTALFLARED 0 ALASKA OIL AND FACILITY REPORT OF 1. Facility Number 2. Facility Name 0290000009 IPBU Lty Name PROD GPMA STATE OF ALASKA GAS CONSERVATION PRODUCED 3. Field PBU -GPMA COMMISSION GAS DISPOSITION 4. O erator p 5. Month/Year of Disposition BP June-2019 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. Disposition Volume MCF 6. Sold 100, 816 Pool Name Pool Code Percent 7. Reinjected 7,891,464 Prudhoe Bay, Niakuk Oil 640148 0.4% Prudhoe Bay, Lisburne Oil 640144 63.6% 8. Flared or vented 1 hour or less 0 Prudhoe Bay, Pt Mcint re Oil 640180 22.8% Prudhoe Bay, Prudhoe Oil 640150 10.4% 9. Flared or vented more than 1 hour (see instr.) 2,437 Prudhoe Bay, Raven Oil 640147 1.3% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 11,468 Prudhoe Bay, Sag Riv Undef 640165 1.6% 11. Assist Gas 133,254 12. Fuel gas used in lease operations. 737,397 13. Other (see instructions) 2,088,311 Official Use Only Authorization >1 hr: /o64 Safety Y 2 7 MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,965,147 15. NGL Gas Equivalent 100,816 Lease Use MCF Conservation MCF0 16. Purchased gas Waste: MCF 17. Transferred from: 1,900,158 n% Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,900,158 Pt McIntyre NGLs at CGF gas equivalent = 7,128 and Fuel Gas from Prudhoe = 0 hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Note: All volumes must be corrected Title Head of Control BP Alaska to pressure of 14.65 psia and to a Printed Name David S. Knapp temperature of 60o F. Authority 20 Phone (907) 564-4694 Date AAC25.235. Form 10-422 Rev. 5/2009 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 6/18/2019 11:10-13:55 328 6/29/2019 12:39-23:59 785 Total Flare > 1 Hour 1,113 Volume Flared 1,113 Measured Safety Pilot 7,099 Continuous Assist 84,723 TOTAL FLARED 92,935 STOP compressor shutdown due to regulator failure of X011 Repaired equipment malfunction, restarted 18## T/C and returned facility to normal BESD Valve U operation Flaring was done because the plant had to Had to SESD the plant due to shipping pump gas release and SESD. Flaring stopped at times because the fire. U front end pressure was bled off to flare BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 6/18/2019 11:10-13:55 354 6/29/2019 12:39-23:59 849 Total Flare > 1 Hour 1,203 Volume Flared 1,203 Measured Safety Pilot 2,902 Continuous Assist 30,368 TOTAL FLARED 34,473 Repaired equipment malfunction, restarted 18## T/C and returned facility to normal STOP compressor shutdown due to regulator failure of X011 U operation Flaring was done because the plant had to SESD. Flaring stopped at times because the Had to SESD the plant due to shipping pump gas release and fi U front end pressure was bled off to flare BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME DATE TIME cf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 6/18/2019 11:10-13:55 6/29/2019 12:39-23:59 Total Flare > 1 Hour 6 Volume Flared 6 Measured Safety Pilot 46 Continuous Assist 563 TOTALFLARED 615 STOP compressor shutdown due to regulator failure of X011 BESD Valve Had to SESD the plant due to shipping pump gas release and fire. Repaired equipment malfunction, restarted 18## T/C and returned facility to normal U operation Flaring was done because the plant had to SESD. Flaring stopped at times because the U front end pressure was bled off to flare BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED AC71ON TAKEN TO ELIMINATE CAUSE Total Flare c= 1 Hour 0 STOP compressor shutdown due to regulator failure of X011 6/18/2019 11:10-13:55 12 BESD Valve 6/29/2019 12:39-23:59 28 Had to SESD the plant due to shipping pump gas release and fire. Total Flare > 1 Hour 40 Volume Flared 40 Measured Safety Pilot 311 Continuous Assist 3,773 TOTAL FLARED 4,124 Repaired equipment malfunction, restarted 18## T/C and returned facility to normal operation Flaring was done because the plant had to SESD. Flaring stopped at times because the front end pressure was bled off to flare BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare - I Hour STV/IP compressor shutdown due to regulator failure of X011 Repaired equipment malfunction, restarted 6/18/2019 11:10-13:55 22 BESD Valve 184t# T/C and returned facility to normal U operation Had to SESD the plant due to shippin Flaring was done because the plant had to 6/29/2019 12:39-23:59 53 fire. i Pump gas release and SESD. Flaring stopped at times because the U front end pressure was bled Off to flare Total Flare > 1 Hour 75 Volume Flared 7S Measured Safety Pilot 11110 Continuous Assist 13,827 TOTAL FLARED 1012 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED TO Total Flare <=1 Hour O Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-19 VOLUME DATE TIME (MSCF ) DESCRIPTION OF INCIDENTS &CAUSE PLANNED w1YmcU ACTION TAKEN TO ELIMINATE Total Flare c=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name IPBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator IBP 5. MonthNear of Disposition Jul -2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 43,049 Pool Name Pool Code Percent 7. Reinjected 7,269,103 Prudhoe Bay, Lisburne Oil 640144 69.6% Prudhoe Bay, Niakuk Oil 640148 0.7% 8. Flared or vented 1 hour or less 5,444 Prudhoe Bay, Pt Mcint re Oil 640180 17.1 % Prudhoe Bay, Prudhoe Oil 640150 10.9% 9. Flared or vented more than 1 hour (see instr.) 12 Prudhoe Bay, Raven Oil 640147 1.0% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 11,680 Prudhoe Bay, Sag Riv Undef 640165 0.8% 11. Assist Gas 86,517 12. Fuel gas used in lease operations. 560,265 13. Other (see instructions) 1,121, 830 Official Use Only Authorization >1 hr: q�Z�g Safety ( MCF 14. TOTAL VOLUME (ITEMS 6-12) 9,097,900 Lease Use MCF 15. NGL Gas Equivalent 43,049 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,603,102 y ` Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,603,102 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF gas equivalent = 7,716 I hereby certify:th:atthe foregoing is true a corre t 4he best of my knowledge. Manager - Production, Royalty and Tax Note: All volumes must be corrected Signature Title Compliance Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20 / '? AAC25.235. Form 10-422 Rev. 5/2009 INCTRI Ir TIr1NC r)K1 RCVC0cC cinr BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/3/2019 12:49-13:29 185 P 7/6/2019 14:53-14:54 23 P 7/7/2019 15:09-15:41 7 P 7/16/2019 10:29-10:30 0 U 7/16/2019 14:25-14:26 0 U 7/20/2019 13:54-14:22 548 U 7/20/2019 13:56-14:23 12 U 7/20/2019 21:33-21:37 18 U 7/20/2019 21:45-21:47 11 U 7/20/2019 22:14-22:45 82 U 7/21/2019 12:02-12:16 3 U 7/21/2019 17:04-17:06 12 U 7/22/2019 3:24-3:25 0 U Total Flare <=1 Hour 901 7/9/2019 13:19-14:20 2 Low Pressure FG shut us down. U Total Flare > 1 Hour 2 Volume Flared 903 Measured Safety Pilot 1,869 Continuous Assist 10,501 TOTAL FLARED 13,273 Completed troubleshooting, reloaded 1800 T/C and stablized facility process and operation VOLUME DATE TIME 7/3/2019 12:49-13:29 805 7/6/2019 14:53-14:54 100 7/7/2019 15:09-15:41 32 7/16/2019 10:29-10:30 1 7/16/2019 14:25-14:26 1 7/20/2019 13:54-14:22 2,387 7/20/2019 13:56-14:23 50 7/20/2019 21:33-21:37 81 7/20/2019 21:45-21:47 47 7/20/2019 22:14-22:45 358 7/21/2019 12:02-12:16 12 7/21/2019 17:04-17:06 54 7/22/2019 3:24-3:25 1 Total Flare <=1 Hour 3,929 7/9/2019 13:19-14:20 9 Total Flare > 1 Hour 9 Volume Flared 3,938 Measured Safety Pilot 7,990 Continuous Assist 62,066 TOTAL FLARED 73,994 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE P P P U U U U U U U U U U Completed troubleshooting, reloaded 1800 T/C and stablized facility process and Low Pressure FG shut us down. U operation BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE 7/3/2019 12:49-13:29 104 P 7/6/2019 14:53-14:54 13 P 7/7/2019 15:09-15:41 4 P 7/16/2019 10:29-10:30 0 U 7/16/2019 14:25-14:26 0 U 7/20/2019 13:54-14:22 309 U 7/20/2019 13:56-14:23 7 U 7/20/2019 21:33-21:37 10 U 7/20/2019 21:45-21:47 6 U 7/20/2019 22:14-22:45 46 U 7/21/2019 12:02-12:16 1 U 7/21/2019 17:04-17:06 7 U 7/22/2019 3:24-3:25 0 U Total Flare <=1 Hour 507 7/9/2019 13:19-14:20 1 Total Flare > 1 Hour Volume Flared 508 Measured Safety Pilot 1,596 Continuous Assist 11,916 TOTAL FLARED 14,020 Low Pressure FG shut us down. Completed troubleshooting, reloaded 1800 T/C and stablized facility process and U operation BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare —1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED 0 VOLUME DATE TIME 7/3/2019 12:49-13:29 8 7/6/2019 14:53-14:54 1 7/7/2019 15:09-15:41 0 7/16/2019 10:29-10:30 0 7/16/2019 14:25-14:26 0 7/20/2019 13:54-14:22 24 7/20/2019 13:56-14:23 1 7/20/2019 21:33-21:37 1 7/20/2019 21:45-21:47 0 7/20/2019 22:14-22:45 4 7/21/2019 12:02-12:16 0 7/21/2019 17:04-17:06 1 7/22/2019 3:24-3:25 0 Total Flare <=1 Hour 40 7/9/2019 13:19-14:20 0 Total Flare > 1 Hour 0 Volume Flared 40 Measured Safety Pilot 65 Continuous Assist 515 TOTAL FLARED 620 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 DESCRIPTION OF INCIDENTS & CAUSE Low Pressure FG shut us down. PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE P P P U U U U U U U U U U Completed troubleshooting, reloaded 1800 T/C and stablized facility process and U operation VOLUME DATE TIME 7/3/2019 12:49-13:29 14 7/6/2019 14:53-14:54 1 7/7/2019 15:09-15:41 1 7/16/2019 10:29-10:30 0 7/16/2019 14:25-14:26 0 7/20/2019 13:54-14:22 41 7/20/2019 13:56-14:23 1 7/20/2019 21:33-21:37 1 7/20/2019 21:45-21:47 1 7/20/2019 22:14-22:45 6 7/21/2019 12:02-12:16 0 7/21/2019 17:04-17:06 1 7/22/2019 3:24-3:25 0 Total Flare <=1 Hour 67 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-19 DESCRIPTION OF INCIDENTS & CAUSE 7/9/2019 13:19-14:20 0 Low Pressure FG shut us down. Total Flare > 1 Hour 0 Volume Flared 67 Measured Safety Pilot 160 Continuous Assist 1,519 TOTAL FLARED 1,746 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE P P P U U U U U U U U U U Completed troubleshooting, reloaded 1800 T/C and stablized facility process and U operation STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name IPBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator 1BP 5. MonthNear of Disposition I Au ust-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 84,696 Pool Name Pool Code Percent 7. Reinjected 7,925,444 Prudhoe Bay, Lisburne Oil 640144 50.8% Prudhoe Bay, Niakuk Oil 640148 0.2% 8. Flared or vented 1 hour or less 1,052 Prudhoe Bay, Pt Mcint re Oil 640180 36.8% Prudhoe Bay, Prudhoe Oil 640150 10.9% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bay, Raven Oil 640147 0.6% Prudhoe Bay, W Beach Oil 640186 0.0% 10. Pilot and Purge 11,591 Prudhoe Bay, W Bch Tr Un 640187 0.0% 11. Assist Gas 89,894 12. Fuel gas used in lease operations. 641,196 13. Other (see instructions) 1,330,074 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,083,947 Lease Use MCF 15. NGL Gas Equivalent 84,696 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,178,533 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,178,533 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF gas equivalent = 5,579 I hereby certify that the foregoing is true and correct to the best of my knowledge. Manager - Production, Royalty and Tax Note: All volumes must be corrected Signature Title Compliance Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield Phone (907) 564-5775 Date temperature of 60o F. Authority 20AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE c„ti ;. ;., r,....u,,. - BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/24/2019 3:11-3:15 47 8/24/2019 7:25-7:26 2 8/24/2019 8:48-8:49 2 8/24/2019 8:49-8:50 2 8/24/2019 20:44-20:51 17 8/25/2019 3:07-3:26 76 8/27/2019 12:03-12:16 44 8/27/2019 5:24-5:25 4 Total Flare <= 1 Hour 194 Total Flare > 1 Hour 0 Volume Flared 194 Measured Safety Pilot 1,442 Continuous Assist 11,904 TOTAL FLARED 13,540 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8, CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/24/2019 3:11-3:15 112 8/24/2019 7:25-7:26 5 8/24/2019 8:48-8:49 5 8/24/2019 8:49-8:50 5 8/24/2019 20:44-20:51 41 8/25/2019 3:07-3:26 180 8/27/2019 12:03-12:16 104 8/27/2019 5:24-5:25 10 Total Flare <= I Hour 462 Total Flare > 1 Hour Volume Flared 462 Measured Safety Pilot 5,713 Continuous Assist 43,500 TOTAL FLARED 49,675 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/24/2019 3:11-3:15 94 p 8/24/2019 7:25-7:26 4 p 8/24/2019 8:48-8:49 4 p 8/24/2019 8:49-8:50 4 p 8/24/2019 20:44-20:51 35 p 8/25/2019 3:07-3:26 152 p 8/27/2019 12:03-12:16 87 p 8/27/2019 5:24-5:25 8 p Total Flare <=1 Hour 388 Total Flare > 1 Hour 0 Volume Flared 388 Measured Safety Pilot 4,280 Continuous Assist 33,348 TOTAL FLARED 38,016 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/24/2019 3:11-3:15 8/24/2019 7:25-7:26 8/24/2019 8:48-8:49 8/24/2019 8:49-8:50 8/24/2019 20:44-20:51 8/25/2019 3:07-3:26 8/27/2019 12:03-12:16 8/27/2019 5:24-5:25 Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared 1 Measured Safety Pilot 24 Continuous Assist 166 TOTALFLARED 191 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME DATE TIME (Mstf) DESCRIPTION OF INCIDENTS &CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/24/2019 3:11-3:15 2 8/24/2019 7:25-7:26 0 P 8/24/2019 8:48-8:49 0 P 8/24/2019 8:49-8:50 0 P 8/24/2019 20:44-20:51 1 P 8/25/2019 3:07-3:26 2 P 8/27/2019 12:03-12:16 2 P 8/27/2019 5:24-5:25 0 P P Total Flare <= 1 Hour 7 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 132 Continuous Assist 976 TOTAL FLARED 1,115 SP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED u ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS &CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Fiore c=1 Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name 1PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator IBP 5. MonthNear of Disposition I Se tember-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume, 6. Sold 104,576 Pool Name Pool Code Percent 7. Reinjected 7,968,041 Prudhoe Bay, Lisburne Oil 640144 63.4% Prudhoe Bay, Niakuk Oil 640148 0.2% 8. Flared or vented 1 hour or less 938 Prudhoe Bay, Pt MCint re Oil 640180 25.0% Prudhoe Bay, Prudhoe Oil 640150 10.2% 9. Flared or vented more than 1 hour (see instr.) 20,470 Prudhoe Bay, Raven Oil 640147 0.5% Prudhoe Bay, W Bch Tr Un 640187 0.0% 10. Pilot and Purge 11,313 Prudhoe Bay, W Beach Oil 640186 0.0% 11. Assist Gas 95,352 12. Fuel gas used in lease operations. 649,002 13. Other (see instructions) 1,641,762 Official Use Only Authorization >1 hr: Safety 2 y 7CJ MCF 14. TOTAL VOLUME (ITEMS 6-12) 10,491,454 Lease Use MCF 15. NGL Gas Equivalent 104,576 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 1,128,102 tt Z3 Commissioner D to 18. Transferred to (Express as a negative #) O 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,128,102 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF gas equivalent = 6,479 1 hereby certify that the foregoing is true an orrec;Ao �he best of my knowledge. Manager - Production, Royalty and Tax Note: All volumes must be corrected Signature Title Compliance Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date Q Zc% 5 AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Dunlicato BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2019 15:26-15:27 19 9/1/2019 17:40-17:43 25 P 9/2/2019 18:08-18:09 58 P 9/3/2019 14:17-14:20 180 U 9/21/2019 13:40-13:41 0 U 9/25/2019 15:40-16:25 199 P P Total Flare <=1 Hour 481 9/10/2019 18:10-22:28 15,810 9/24/2019 22:57-23:59 107 9/25/2019 00:01-2:38 505 Total Flare > 1 Hour 16,422 Volume Flared 16,903 Measured Safety Pilot 6,998 Continuous Assist 59,233 TOTALFLARED 83,134 1807 Reinjection compressor shutdown because of control/instrumentation The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the PSV) I HIS IS d 4UrItI1IUdtl UII UI yeSlerUdy S Ildre eVerll... Same event, IL just rolled past midnight. The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the PSV) Field production was cut to lower gas U production until 1807 T/C restarted Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE 9/1/2019 15:26-15:27 3 9/1/2019 17:40-17:43 4 9/2/2019 18:08-18:09 9 9/3/2019 14:17-14:20 30 9/21/2019 13:40-13:41 0 9/25/2019 15:40-16:25 33 Total Flare <=1 Hour 79 1807 Reinjection compressor shutdown because of 09/10/19 18:10-22:28 2,604 control/instrumentation The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the 09/24/19 22:57-23:59 17 flare valve opened (not the PSV) 11ID O d can Ll WdHun ui yeb Lewdy ] IIdre even L... Jdrlle even L, it just rolled past midnight. The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise 09/25/19 00:01-2:38 83 until it reached the point that the flare valve opened (not the Total Flare > 1 Hour 2,704 Volume Flared 21783 Measured Safety Pilot 2,890 Continuous Assist 24,162 TOTALFLARED 29,835 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE P P U U P P Field production was cut to lower gas U production until 1807 T/C restarted Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2019 15:26-15:27 0 9/1/2019 17:40-17:43 0 P 9/2/2019 18:08-18:09 0 P 9/3/2019 14:17-14:20 1 U 9/21/2019 13:40-13:41 0 U 9/25/2019 15:40-16:25 1 P P Total Flare <=1 Hour 2 09/10/19 18:10-22:28 51 09/24/19 22:57-23:59 0 09/25/19 00:01-2:38 2 Total Flare > 1 Hour 53 Volume Flared 55 Measured Safety Pilot 20 Continuous Assist 174 TOTAL FLARED 249 1807 Reinjection compressor shutdown because of control/instrumentation The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the PSV) I Il1b q d WrlUnUdLIUn UI yebLeWdy 5 IIdre even L... DdrrIe eVeIIL, it just rolled past midnight. The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the Field production was cut to lower gas U production until 1807 T/C restarted Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/l/2019 15:26-15:27 1 9/1/2019 17:40-17:43 1 P 9/2/2019 18:08-18:09 1 P 9/3/2019 14:17-14:20 3 U 9/21/2019 13:40-13:41 0 U 9/25/2019 15:40-16:25 4 P P Total Fiore <=1 Hour 10 09/10/19 18:10-22:28 322 09/24/19 22:57-23:59 2 09/25/19 00:01-2:38 10 Total Flare> 1 Hour 334 Volume Flared 344 Measured Safety Pilot 134 Continuous Assist 1,132 TOTAL FLARED 1,610 1807 Reinjection compressor shutdown because of control/instrumentation The gas out valve (P001) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the PSV) 111O IS a CUm riudoun u, yebWfUdy b Ildle evefl L...Salile event, it just rolled past midnight. The gas out valve (Pool) failed and went closed, causing the pressure in the drum to rise until it reached the point that the flare valve opened (not the Field production was cut to lower gas U production until 1807 T/C restarted Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 229 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/1/2019 15:26-15:27 1 9/1/2019 17:40-17:43 2 P 9/2/2019 18:08-18:09 5 P 9/3/2019 14:17-14:20 14 U 9/21/2019 13:40-13:41 0 U 9/25/2019 15:40-16:25 16 P P Total Flare <=1 Hour 38 09/10/19 18:10-22:28 1807 Reinjection compressor shutdown because of 1,238 control/instrutmentaon The gas out valve (P001) failed and went closed, causing the 09/24/19 22:57-23:59 pressure in the drum to rise until it reached the point that the 8 flare valve opened (not the P5V) I nlb Ib d LUrIU11UdL1UII UI yebLefUdy b Ildre eVeflt... bdlne eVeDL, IL just rolled past midnight. The gas out valve (P001) failed and 09/25/19 00:01-2:38 went closed, causing the pressure in the drum to rise until it 39 reached the point that the flare valve opened (not the PSV) Total Flare > 1 Hour 1,285 Volume Flared 1,323 Measured Safety Pilot 1,271 Continuous Assist 10,651 TOTAL FLARED 13,245 Field production was cut to lower gas U production until 1807 T/C restarted Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. Inst techs were called out and they got the valve opening. Valve will be fully repaired U tomorrow. BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= I Hour p Total Flare > I Hour Volume Flared U Measured Safety Pilot p Continuous Assist p TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNcn Ar-r,—.. �CLimiNATE CAUSE Total Flare - I Hour 0 Total Flare > 1 Hour Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 2. Facility Name 3 Field 4 O 0290000009 PBU LISBURNE PROD GPMA PBU -GPMA Volume MCF Aerator 5. Near of Disposition BP October-2019 20. For production from multiple pools, list contribution of each pool as a percent of Disposition 6. Sold 110,187 Total Volume. Pool Name Pool Code Percent 7. Reinjected 8,868,786 Prudhoe Bay, Lisburne Oil 640144 64.0% Prudhoe Bay, Niakuk Oil 640148 0.2% 8. Flared or vented 1 hour or less 595 Prudhoe Bay, Pt Mcint re Oil 640180 26.0% Prudhoe Bay, Prudhoe Oil 640150 8.5% 9. Flared or vented more than 1 hour (see instr.) 558 Prudhoe Bay, Raven Oil 640147 0.6% Prudhoe Bay, W Bch Tr Un 640187 0.0% 10. Pilot and Purge 11,830 Prudhoe Bay, W Beach Oil 640186 0.0% 11. Assist Gas 100,300 12. Fuel gas used in lease operations. 777,486 13. Other (see instructions) 1,779,329 Official Use Only Authorization >1 hr: Safety ��� MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,649,071 Lease Use MCF 15. NGL Gas Equivalent 110,187 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,290,395 ` 18. Transferred to: (Express as a negative #) 0 Commissioner 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,290,395 and Fuel Gas from Prudhoe = 0 Pt McIntyre NGLs at CGF gas equivalent = 7,646 hereby certify that the foregoing is tr a and correct to the best of my knowledge. Signature Manager - Production, Royalty and Tax Note: All volumes must be corrected w Title Compliance Alaska to pressure of 14.65 psia and to a Printed Name Mark Littlefield temperature of 60o F. Authority 20 Phone (907) 564.5775 Date // E3 Zr AAC25.235 Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/21/2019 4:09-4:13 156 10/21/2019 7:37-8:09 224 U 10/22/2019 2:45-3:34 13 U U Total Flare <=1 Hour 393 1808 Reinjection compressor shutdown because of Repaired equipment malfunction, restarted control/instrumentation failure associated with P024 FG 1808 T/C and returned facility to normal 10/20/2019 7:17-16:33 346 Control Value. U operations Plant shutdown because of field wide power outage. Operations shutdown facility in response. This was the amount Flare valves closed after plant shutdown was 10/21/2019 7:39-13:16 22 flared through the LP Flare U complete Total Flare > 1 Hour 368 Volume Flared 761 Measured Safety Pilot 7,605 Continuous Assist 64,517 TOTALFLARED 72,883 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/21/2019 4:09-4:13 57 10/21/2019 7:37-8:09 82 U 10/22/2019 2:45-3:34 5 U U Total Flare <=1 Hour 144 10/20/2019 7:17-16:33 125 10/21/2019 7:39-13:16 8 Total Flare > 1 Hour 133 Volume Flared 277 Measured Safety Pilot 3,036 Continuous Assist 25,724 TOTAL FLARED 29,037 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with P024 FG Control Value. Plant shutdown because of field wide power outage. Operations shutdown facility in response. This was the amount flared through the LP Flare Repaired equipment malfunction, restarted 1808 T/C and returned facility to normal U operations Flare valves closed after plant shutdown was U complete BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/21/2019 4:09-4:13 0 10/21/2019 7:37-8:09 0 U 10/22/2019 2:45-3:34 0 U U Total Flare c=1 Hour 0 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with P024 FG 10/20/2019 7:17-16:33 1 Control Value. Plant shutdown because of field wide power outage. Operations shutdown facility in response. This was the 10/21/2019 7:39-13:16 0 amount flared through the LP Flare Total Flare > 1 Hour 1 Volume Flared 1 Measured Safety Pilot 28 Continuous Assist 238 TOTAL FLARED 267 Repaired equipment malfunction, restarted 1808 T/C and returned facility to normal U operations Flare valves closed after plant shutdown was U complete VOLUME DATE TIME (Ms 10/21/2019 4:09-4:13 4 10/21/2019 7:37-8:09 5 10/22/2019 2:45-3:34 0 Total Flare <=1 Hour 9 10/20/2019 7:17-16:33 8 10/21/2019 7:39-13:16 1 Total Flare > 1 Hour 9 Volume Flared 18 Measured Safety Pilot 152 Continuous Assist 1,285 TOTAL FLARED 1,455 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN L15BURNE PRODUCTION CENTER GAS FLARING INCIDENTS Ott-19 DESCRIPTION OF INCIDENTS & CAUSE 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with P024 FG Control Value. Plant shutdown because of field wide power outage. Operations shutdown facility in response. This was the amount flared through the LP Flare PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE U U U Repaired equipment malfunction, restarted 1808 T/C and returned facility to normal U operations Flare valves closed after plant shutdown was U complete BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/21/2019 4:09-4:13 19 10/21/2019 7:37-8:09 29 U 10/22/2019 2:45-3:34 1 U U Total Flare <=1 Hour 49 1808 Reinjection compressor shutdown because of control/instrumentation failure associated with P024 FG 10/20/2019 7:17-16:33 44 Control Value. Plant shutdown because of field wide power outage. Operations shutdown facility in response. This was the amount 10/21/2019 7:39-13:16 3 flared through the LP Flare Total Flare > 1 Hour 47 Volume Flared 96 Measured Safety Pilot 1,009 Continuous Assist 8,536 TOTAL FLARED 9,641 Repaired equipment malfunction, restarted 1808 T/C and returned facility to normal U operations Flare valves closed after plant shutdown was U complete BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME DATE rl✓ .-cu TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare> 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour p Total Flare > 1 Hour Volume Flared p Measured Safety Pilot p Continuous Assist p TOTALFLARED 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator .5. BP Month/Year of Disposition I November-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 132,363 Pool Name Pool Code Percent 7. Reinjected 8,875,104 Prudhoe Bay,Lisburne Oil 640144 72.0% Prudhoe Bay,Niakuk Oil 640148 0.2% 8. Flared or vented 1 hour or less 0 Prudhoe Bay,Pt Mcint re Oil 640180 18.4% Prudhoe Bay,Prudhoe Oil 640150 8.2% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bav, Raven Oil 640147 0.6% Prudhoe Bay, W Bch Tr Un 640187 0.0% 10. Pilot and Purge 11,495 Prudhoe Bay, W Beach Oil 640186 0.0% 11, Assist Gas 95,255 12. Fuel gas used in lease operations. 799,246 13. Other (see instructions) 2,066,164 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 11,979,627 Lease Use MCF 15. NGL Gas Equivalent 132,363 Conservation MCF 16. Purchased gas Waste: MCF 17. Transferred from: 1,017,964 Commissioner Date 18. Transferred to: (Express as a negative #) 0 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = L017,964 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true and rect t th est of my knowledge. Note: All volumes must be corrected Signature Title Manager Production Taxes and Royalties Alaska to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 Printed Name Phone (907) 564-5775 Date 1 -ve, AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVFRSF ,,InF BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 966 Continuous Assist 8,048 TOTAL FLARED 9,014 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 28 Continuous Assist 228 TOTALFLARED 256 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Fiore > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 2,108 Continuous Assist 17,496 TOTAL FLARED 19,604 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (Mstf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 135 Continuous Assist 1,120 TOTAL FLARED 1,255 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <= 1 Hour p Total Flare > 1 Hour p Volume Flared U Measured Safety Pilot 8,258 Continuous Assist 68,363 TOTALFLARED 76,621 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (MSCF DESCRIPTION OF INCIDENTS & CAUSE Total flare <=1 Hour 0 Total Flare> 1 Hour 0 Volume Flared Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Nov-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000009 2. Facility Name PBU LISBURNE PROD GPMA 3. Field PBU - GPMA 4. Operator BP 5. MonthNear of Disposition I December-2019 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 146,069 Pool Name Pool Code Percent 7. Reinjected 9,832,386 Prudhoe Bay,Lisburne Oil 640144 70.5% Prudhoe Bay,Niakuk Oil 640148 0.3% 8. Flared or vented 1 hour or less 0 Prudhoe Bay,Pt Mcint re Oil 640180 23.6% Prudhoe Bay,Prudhoe Oil 640150 4.8% 9. Flared or vented more than 1 hour (see instr.) 0 Prudhoe Bay,Raven Oil 640147 0.3% Prudhoe Bay, W Bch Tr Un 640187 0.0% 10. Pilot and Purge 11,899 Prudhoe Bay, W Beach Oil 640186 0.0% 11. Assist Gas 106,485 12. Fuel gas used in lease operations. 851,352 13. Other (see instructions) 2,026,525 Official Use Only Authorization >1 hr: Safety MCF 14. TOTAL VOLUME (ITEMS 6-12) 12,974,716 Lease Use MCF 15. NGL Gas Equivalent 146,069 Conservation MCF 16. Purchased gas 0 Waste: MCF 17. Transferred from: 1,443,803 18. Transferred to: (Express as a negative #) 0 Commissioner Date 19. Remarks: Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,443,803 and Fuel Gas from Prudhoe = 0 1 hereby certify that the foregoing is true an correct �q/he best of my knowledge. Note: All volumes must be corrected Signature Title Manaqer Production Taxes and Royalties Alaska to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Mark Littlefield Phone (907) 564-5775 Date / ,—zow"' AAC25.235. Form 10-422 Rev. 5/2009 INSTRt1CTIONS nN RFVFRSF .oinF c„h—if ;., n,, r BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 8,389 Continuous Assist 74,946 TOTAL FLARED 83,335 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <=1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 36 Continuous Assist 326 TOTAL FLARED 362 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot 2,799 Continuous Assist 25,186 TOTAL FLARED 27,985 BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 107 Continuous Assist 955 TOTAL FLARED 1,062 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE Total Flare c=1 Hour 0 Total Flare > I Hour 0 Volume Flared 0 Measured Safety Pilot 568 Continuous Assist 5,072 TOTAL FLARED 5,640 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 DATE TIME VOLUME (MSCF DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour 0 Total Flare> 1 Hour 0 Volume Flared - 0 Measured Safety Pilot 0 Continuous Assist 0 TOTALFLARED 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE BP EXPLORATION ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-19 VOLUME DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE Total Flare <=1 Hour p Total Flare > 1 Hour p Volume Flared 0 Measured Safety Pilot D Continuous Assist U TOTALFLARED D PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE