Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-061 I 0RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION TAC-30 201b WELL COMPLETION OR RECOMPLETION REPORT. G la.Well Status: Oil❑ Gas❑ SPLUG❑ Other ❑ Abandoned ❑ '' Suspended ❑ lb.Well-Vete ass: 20AAC 25.105 20AAC 25.110 Development ❑ • Exploratory ❑ GINJ ❑ WINJ❑ WAGE WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 6. Date Comp.,Susp.,or 14.Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.: 10/30/2016 ' 194-061/316-416/ ` 3.Address: 7. Date Spudded: 15.API Number: P.O. Box 100360 Anchorage,AK 99510-0360 4/21/1994 50-029-22472-00 ,. 4a.Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 500'FNL,292'FEL,Sec 9,T11 N, R10E, UM 4/28/1994 KRU 1B-18 . Top of Productive Interval: 9. Ref Elevations: KB:102 17. Field/Pool(s): N/A GL: 61 BF:41 Kuparuk River Field/Kuparuk River Oil Pool ' Total Depth: 10.Plug Back Depth MD/TVD: 18.Property Designation: 2090'FSL,603'FEL,Sec 9,T11 N„ R10E, UM 7722/6858 ADL 25648 4b. Location of Well(State Base Plane Coordinates,NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 550147 y- 5969648 Zone- 4 7824/6941 ALK 466 TPI: x- N/A y- N/A Zone- 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 549860 y- 5966956 Zone- 4 N/A 1602/1602 5. Directional or Inclination Survey: Yes ❑ (attached) No 0 13.Water Depth, if Offshore: 21. Re-drill/Later p Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL)1:-,>_ N'"~A 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary l N/A S�°`�0.0 lA .L 4I 23. CASING, LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH NAMOUNT D HOLE SIZE CEMENTING RECORD CASING GRADE FT TOP BOTTOM TOP BOTTOM PULLED 16 62.5 H-40 43 121 43 121 24 200 sx ASI 7 5/8 29.7 L-80 41 4256 41 4148 9.875 650 sx ASIII,300 sx G 5 X 5.5 17/18 L-80 26 7809 26 6930 6.75 210 sx G 24.Open to production or injection? Yes ❑ No 2 25.TUBING RECORD If Yes, list each interval open(MD/TVD of Top and Bottom;Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 3 1/2 7061 6934 MD/6244 ND Perls cement squeezed prior to CTD operations A(3f}n]VONG17 7526-7539 MD/6699-6709 ND 26.ACID, FRACTURE,CEMENT SQUEEZE, ETC. 7548-7575 MD/6716-6736 ND Was hydraulic fracturing used during completion? Yes❑ No 0 ID 13°illy Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED LI- 7050'-7541'(Squeeze perfs) 50 bbls 14.5#Class G(30 bbls with 2ppb CEMNET) OA cemented to SF 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): N/A PLUGGED BACK Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �4 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate Form 10 37 j 9vised 11/2015 1/TL Z`6,�``7 CONTINUED ON PAGE 2 RBDMS t;k- JAN 1 8 2017 Submit ORIGINIAL onl • • 28.CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No 2 If Yes,list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No 2 Permafrost-Top Surface Surface If yes, list intervals and formations tested,briefly summarizing test results. Permafrost-Base 1602 1602 Attach separate pages to this form,if needed,and submit detailed test Top of Productive Interval N/A N/A information, including reports,per 20 AAC 25.071. Formation at total depth: N/A 31. List of Attachments: Daily Operations Summary,Schematic Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report.production or well test results.Der 20 AAC 25.070. 32. I hereby certify that i e foregoing is tr - and correct to the best of my knowledge. Contact: Jeff Con F • 263-4112 , Email: jell.s.connellyaconocophillips.com Printed Name: G.Eller %WIWI & Title: Principal CTD Engineer Signature: ,` Phone: 263-4172 Date: \-2_.--?_A—\b INSTRUCTIONS General: This form and the req attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item lb: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation:Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results,including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only r► 1 B-18 DTTMSTA JOBTYP SUMMARYOPS 10/29/16 DRILLING Rig up on CDR2. Perform slack management, trim 105 ft coil to reacquire wire. Re SIDETRACK Head and pressure test 4000 psi, pull test 50k. Perform Initial BOPE test(witness waived by Jeff Jones) Micro Motion callibrated by Dave Smith. MU window milling BHA#1 as of midnight. 10/30/16 DRILLING RIH with BHA#1. Minus 4.0 ft correction at K1. Dry tag pinch point at 7,506 ft. Mill SIDETRACK window from 7,505.3 ft to 7,506.6 ft motor stalled /chuncked, rubber across shaker. POOH. LD BHA#1, motor locked up. MU/RIH with window milling BHA#2. Minus 4.5 ft correction at K1. Mill window from 7,506.6 ft, bottom of window at 7,511 ft, rathole to 7,527 ft. Back ream window 330R, 300R and HS. Dry drift window, clean. POOH, at 2,000 ft as of midnight. 10/31/16 DRILLING Continue POOH. PUD BHA#2. MU/PD/RIH with drilling BHA#3, 2.3-°AKO motor SIDETRACK and RR HCC bit. Minus 4.5 ft correction at K1. Circulate hole to new 8.7 ppg FloPro (6% KCI). Drill build 7,527 ft to 7,533 ft, tools lost communication. POOH. PUD BHA #3 (Lower QC short) MU/PD/RIH with 2nd build BHA#4. Minus 3.0 ft correction at K1. Drill build 7,533 ft to 7,664 ft. Surveys dirty, troubleshoot. POOH. tag up at surface as of midnight. 11/1/16 DRILLING PUD BHA#4. MU/PD/RIH with 3rd build BHA#5. Minus 3.5 f correction at K1. Drill SIDETRACK build from 7,664 ft to section TD at 7855 ft. POOH. Jog tubing tail. Continue POOH. PUD BHA#5. PD BHA#6 with 0.5° AKO Weatherford motor and RB HYC bit. RIH. 11/2/16 DRILLING RBIH to 7855 ft. Continue drilling ahead to wiper trip depth of 825 ft. PUH into 5" SIDETRACK casing and jog BHA. RBIH, continue drilling ahead to 8725 ft. Unable to get a clean survey after 8630 ft. Made decision to POOH and reconfigure BHA. POOH. Begin PUD BHA#6. 11/3/16 DRILLING PD BHA#7 with 0.5°AKO motor and a RR HCC bit. RIH, tie in for a -2.5 ft correction. SIDETRACK Stacked out in build section. Work BHA through trouble area. Take survey checkshots in open hole. Drill ahead from 8725 ft to midnight depth of 9453 ft. 11/4/16 DRILLING SIDETF Crosscut down through section to called TD of 9500 ft. Pump sweeps, Wiper up to the swabs. RBIH, tie-in for a -.2.5 ft correction. Clean up build section. Continue to RIH. Could not work BHA past 9252 ft. Perform second wiper to the window. RBIH. Could not work past 9269 ft. POOH pumping liner running pill followed by completion 11/5/16 DRILLING Finish LD BHA#7. Function test BOPE. RU and run 29 joints of slotted liner and OH SIDETRACK anchored billet. Set down off bottom at 8315 ft. Could not work liner in either direction. Pump off billet and POOH. Flow check at surface. Static. LD BHA#8. PU WS assembly BHA#9. RIH, tie-in for a -2.5 ft correction. Position WS on depth and set per BOT. Top of WS at 7392 ft. POOH and LD running tools over a dead well. PU BHA#10 with 0.6° AKO motor and HCC DSM. RIH and tie-in for-4 ft correction. Continue RIH. 11/6/16 DRILLING Finish displacing well to FloPro drilling fluid. RIH and dry tag top of WS at 7395 ft. Mill SIDETRACK window and rathole to 7417 ft per procedure. Dry drift clean. POOH and PUD BHA #10. PD build BHA#11 with 1.7° AKO motor and RB HCC bit. RIH with BHA#11. 11/7/16 DRILLING Drill 28° DLS section of build interval to -7562 ft. Pump sweeps. POOH, PUD build SIDETRACK BHA#11. PD build BHA#12 with 2.3°AKO motor and RR HCC bit. RIH, tie-in for-3 ft correction. Continue drilling build section to midnight depth of 7693 ft.. 11/8/16 DRILLING TD build section at 7800 ft. Pump sweeps, POOH. PUD BHA#12. PD lateral BHA SIDETRACK #13 and RIH.Log K1 for a -2.5' correction. Continue drilling AL3 lateral tomidnight depth of 8,218'. 11/9/16 DRILLING Drill in AL3 Lateral from 8,218 ft to a midnight depth of 8,574 ft. SIDETRACK 11/10/16 DRILLING Drilled in AL3 Lateral from 8,218 ft to 8,685 ft and then POOH due to low ROP and SIDETRACK change to a .5° Weatherford motor and a new SR3208M-C1 Hycalog Bit. RBIH and drilled from 8,685 ft to a midnight depth of 8,853 ft. • • 0 Operations Summary (with Timelog Depths) 1B-18 Co€iocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 10/28/2016 10/28/2016 1.00 MIRU MOVE RURD P Complete pre move check list. 0.0 0.0 12:00 13:00 10/28/2016 10/28/2016 4.00 MIRU MOVE MOB P Trucks on location, PJSM,stage pits 0.0 0.0 13:00 17:00 on pad,pull sub off 2B-02,hook up jeeps,move rig to 2C pad access road. 10/28/2016 10/28/2016 1.00 MIRU MOVE WAIT T Wait at 2C pad access for CPF2 crew 0.0 0.0 17:00 18:00 change out. 10/28/2016 10/28/2016 3.00 MIRU MOVE MOB P Move rig from 2C pad to 1B-pad. 0.0 0.0 18:00 21:00 10/28/2016 10/28/2016 0.50 MIRU MOVE MOB P Remove jeeps,prep 1B-18,set 0.0 0.0 21:00 21:30 herculite and mat. 10/28/2016 10/28/2016 1.25 MIRU MOVE MOB P Spot sub over 1B-18,lay mats and set 0.0 0.0 21:30 22:45 down. 10/28/2016 10/29/2016 1.25 MIRU MOVE MOB P Spot pits,lay mays and set down 0.0 0.0 22:45 00:00 10/29/2016 10/29/2016 1.00 MIRU MOVE RURD P Release trucks,lower BOPE's,work 0.0 0.0 00:00 01:00 on post rig move check list. 10/29/2016 10/29/2016 3.00 MIRU MOVE RURD P Start rig up checklist.Hook up steam. 0.0 0.0 01:00 04:00 berm celler.Hook up PUTZ interconnect.RU flowline. 10/29/2016 10/29/2016 2.00 MIRU WHDBOP NUND P NU BOPE. Install choke hose and 0.0 0.0 04:00 06:00 annular hydraulics.Check tree bolts, all tight(40 minutes). Grease choke valves and BOP valves. 10/29/2016 10/29/2016 3.00 MIRU WHDBOP CTOP P Perform Slack Management,trim 105 0.0 0.0 06:00 09:00 ft of coil to find wire,install CTC,pull tested to 52 k,re-headed BHI upper quick(sim-ops), 10/29/2016 10/29/2016 8.00 MIRU WHDBOP BOPE P Start BOP testing,test witness waived 0.0 0.0 09:00 17:00 per state tester Jeff Jones,3,500 psi high/250 psi low/2,500 annular preventor.Stab INJH test inner reel valve,stripper,and tiger tank line. 10/29/2016 10/29/2016 2.50 MIRU WHDBOP PRTS P Pressure test CTC 4,000 psi,good. 0.0 0.0 17:00 19:30 Post BOPE grease choke and BOPE valves. RD testing equipment,freeze protect test pump,store test joint back onto rack in pipe shed.SimOps- Calibrate MM with Dave Smith. 10/29/2016 10/29/2016 2.50 MIRU WHDBOP MPSP P PJSM,Load BPV equipment,MU and 0.0 0.0 19:30 22:00 lubricate out BPV,tubing 230 psi, bleed tubing to zero,still flowing,RD BPV equipment,off load same while performing valve alignment check list, blow down TT line. 10/29/2016 10/30/2016 2.00 PROD1 WHPST PULD P PJSM-Install checks,MU milling BHA 0.0 74.3 22:00 00:00 #1,0.6°motor with 2.79"string reamer and 2.79"no-go window mill,MU to CoilTrak,surface test 10/30/2016 10/30/2016 1.85 PROD1 WHPST TRIP P RIH with window milling BHA#1 74.3 6,930.0 00:00 01:51 10/30/2016 10/30/2016 0.45 PROD1 WHPST DLOG P Tie in to K1 for minus 4.0 ft correction, 6,930.0 6,995.0 01:51 02:18 continue to log HRZ 10/30/2016 10/30/2016 0.70 PROD1 WHPST TRIP P RIH,dry tag pinch point at 7,506 ft, 6,995.0 7,506.0 02:18 03:00 PUW 34k,set milling parameters. Page 1/37 Report Printed: 12/29/2016 • • Operations Summary (with Timelog Depths) 0.2 1B-18 ConocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(ftKB) 10/30/2016 10/30/2016 1.10 PROD1 WHPST WPST P 7505.3 ft.Milling 1.53 bpm at 3,769 7,506.0 7,506.7 03:00 04:06 psi FS per recomended practice,WHP 0, IA 400,OA 3,getting crude stringers back,take 5 bbls out,adjust WHP to 200 psi,pumping 7 bph away 10/30/2016 10/30/2016 0.60 PROD1 WHPST WPST T 7,506.7 ft. Stall motor,PU,set 7,506.7 7,506.7 04:06 04:42 parameters,free spin higher,attempt to restart milling and stalled,chunked motor suspect,unable to pump through bit,Open EDC. 10/30/2016 10/30/2016 2.00 PROD1 WHPST TRIP T POOH for new motor 7,506.7 74.3 04:42 06:42 10/30/2016 10/30/2016 1.50 PROD1 WHPST PULD T PJSM,undeploy failed milling BHA#1, 74.3 0.0 06:42 08:12 WHP dropped to zero,check well for flow(no-flow)LD motor 10/30/2016 10/30/2016 1.25 PROD1 WHPST PULD T PU/MU BHA#2 with new motor and 0.0 74.3 08:12 09:27 mills. 10/30/2016 10/30/2016 1.75 PROD1 WHPST TRIP T Tag up set counters,RIH 74.3 6,960.0 09:27 11:12 10/30/2016 10/30/2016 0.50 PROD1 WHPST DLOG T Log the K1 correction of minus 4.5', 6,960.0 7,506.0 11:12 11:42 continue RIH to pinch point. ****Note:NPT 7.0 hrs Baker Hughes. 10/30/2016 10/30/2016 8.60 PROD1 WHPST MILL P Dry tag pinch point at 7,506',PUW 32 7,506.0 7,527.0 11:42 20:18 k, 1.45 bpm at 3735 psi FS,BHP 3,597,open choke,IA 357,OA 3, holding 1:1 returns. Once bit outside casing,slowly bring ECD up to 11.8 at window, 1.44 bpm at 4,120 psi,BHP 4,025 psi,WHP 433, 1.30 bpm rate out,-8 bph losses. 10/30/2016 10/30/2016 2.30 PROD1 WHPST REAM P 7,527 ft. TD rathole.back ream 7,527.0 7,527.0 20:18 22:36 window area,330R,300R and HS,dry drift window,clean,open EDC 10/30/2016 10/31/2016 1.40 PROD1 WHPST TRIP P POOH for drilling BHA maintaining 7,527.0 2,000.0 22:36 00:00 11.8 tripping schedule. 10/31/2016 10/31/2016 0.75 PROD1 WHPST TRIP P POOH for drilling BHA maintaining 2,000.0 74.3 00:00 00:45 11.8 tripping schedule. 10/31/2016 10/31/2016 1.35 PROD1 WHPST PULD P PUD/LD BHA#2 74.3 0.0 00:45 02:06 10/31/2016 10/31/2016 1.60 PROD1 DRILL PULD P PJSM-MU/PD drilling BHA#3, MU to 0.0 72.2 02:06 03:42 CoilTrak,surface test. 10/31/2016 10/31/2016 1.65 PROD1 DRILL TRIP P RIH with BHA#3,2.3-°AKO motor 72.2 6,950.0 03:42 05:21 and HCC RR 1-1 Bi-center bit,sat down at 4,239 ft(GLM#2 at 4,223 ft) PUW 24k,orientate TF 180°,RIH clean past suspect GLM. 10/31/2016 10/31/2016 0.30 PROD1 DRILL DLOG P Tie in at K1 for minus 4.5 ft correction 6,950.0 6,976.0 05:21 05:39 10/31/2016 10/31/2016 1.00 PROD1 DRILL TRIP P RIH,displacing well to new mud,close 6,976.0 7,527.0 05:39 06:39 EDC,PUW 29 k,continue RIHTB 10/31/2016 10/31/2016 0.85 PROD1 DRILL DRLG P OBD 1.43 bpm at 4,200 psi,BHP 7,527.0 7,533.0 06:39 07:30 4,344,WHP 530, IA 0,OA 6 10/31/2016 10/31/2016 1.75'PROD1 DRILL TRIP T PUH,Bill tools lost power, 7,533.0 74.3 07:30 09:15 troubleshoot from surface,(issue pointing down hole via troubleshooting flowchart. p Page 2/37 Re ort Printed: 12/29/2016 • • 0 Operations Summary (with Timelog Depths) ri 1B-18 tConoc oPhiliips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 10/31/2016 10/31/2016 2.00 PROD1 DRILL PULD T PJSM,PUD build section BHA with a 74.3 0.0 09:15 11:15 2.3°bend motor successfully,inspect upper quick and flowsub, 10/31/2016 10/31/2016 1.75 PROD1 DRILL PULD T PD,build section BHA#4(pre-loaded) 0.0 72.2 11:15 13:00 Stab INJH,surface test tools(good test) 10/31/2016 10/31/2016 1.55 PROD1 DRILL TRIP T RIH with build section BHA#4 72.2 6,950.0 13:00 14:33 10/31/2016 10/31/2016 0.25 PROD1 DRILL DLOG T Log the K1 correction of minus 3.0' 6,950.0 6,972.0 14:33 14:48 "*Note: NPT for failed drilling tools 7.0 hrs. 10/31/2016 10/31/2016 0.50 PROD1 DRILL TRIP T RIH,PUW above window 29k,Close 6,972.0 7,533.0 14:48 15:18 EDC 10/31/2016 10/31/2016 6.65 PROD1 DRILL DRLG P OBD 1.45 bpm at 4093 psi,BHP 7,533.0 7,664.0 15:18 21:57 4101,WHP 594, IA 353,OA 7,slow drilling thru Anchorite,getting dirty surveys,not solar or environmental disruption,troubleshoot,suspect DGS. 10/31/2016 11/1/2016 2.05 PROD1 DRILL TRIP T POOH for new BHA 7,664.0 72.2 21:57 00:00 ***Note:NPT for failed drilling tools 2.0 hrs. 11/1/2016 11/1/2016 1.35 PROD1 DRILL PULD T PJSM-PUD BHA#4,bit condition 2-2- 72.2 0.0 00:00 01:21 BT-A-X-I-NO-DTF 11/1/2016 11/1/2016 1.55 PROD1 DRILL PULD T PJSM-MU/PD 3rd build BHA#5,2.3-° 0.0 72.2 01:21 02:54 AKO motor and RR HCC bit,MU to Coil Trak,surface test.(Sim-Ops) 11/1/2016 11/1/2016 1.55 PROD1 DRILL TRIP T RIH with 3rd build BHA#5 72.2 6,950.0 02:54 04:27 11/1/2016 11/1/2016 0.25 PROD1 DRILL DLOG T Tie in to K1 for a minus 3.5 ft 6,950.0 6,973.0 04:27 04:42 correction 11/1/2016 11/1/2016 0.30 PROD1 DRILL TRIP T RIH,PUW above window 29k,close 6,973.0 7,520.0 04:42 05:00 EDC,clean thru window. 11/1/2016 11/1/2016 0.25 PROD1 DRILL DLOG T Log RA at 7,509.5 ft,TOWS at 7,502 7,520.0 7,657.0 05:00 05:15 ft.Continue RIH. ***Note: NPT for failed drilling tools 5 hrs. 11/1/2016 11/1/2016 1.50 PROD1 DRILL DRLG P Stack weight,PUH,dragging minus 7,657.0 7,664.0 05:15 06:45 3.0 k to minus 5.0 k DHWOB,lower pump rate work pipe to bottom,back reaming area from 7,657'up to 7,520' 11/1/2016 11/1/2016 8.25 PROD1 DRILL DRLG P 7,664 ft. OBD 1.40 bpm at 4,100 psi, 7,664.0 7,855.0 06:45 15:00 BHP 4,138,WHP 539,IA 533,OA 11 11/1/2016 11/1/2016 0.50 PROD1 DRILL TRIP P TD build section(EOB),wiper up hole, 7,855.0 7,816.0 15:00 15:30 seems to be dragging 7,816' 11/1/2016 11/1/2016 2.00 PROD1 DRILL TRIP P Continue wiper up hole,cleaning open 7,816.0 7,060.0 15:30 17:30 hole. Jog tubing tail area.Significant cuttings observed over the shaker at bottoms up. 11/1/2016 11/1/2016 2.50 PROD1 DRILL TRIP P Open EDC,continue POOH.Tag up 7,060.0 66.0 17:30 20:00 and space out at surface. Page 3/37 Report Printed: 12/29/2016 • • 0 Operations Summary (with Timelog Depths) A 1B-18 Horn t ! tiilliips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/1/2016 11/1/2016 1.00 PROD1 DRILL PULD P PJSM.PUD build BHA#5. Bit graded 66.0 0.0 20:00 21:00 1-1. 11/1/2016 11/1/2016 1.25 PROD1 DRILL PULD P PJSM,PD lateral BHA#6 with 0.5° 0.0 74.0 21:00 22:15 Weatherford motor and RB HYC bit. 11/1/2016 11/2/2016 1.75 PROD1 DRILL TRIP P RIH with BHA#6.Tie in to K1 for a- 74.0 6,984.0 22:15 00:00 3.5 ft correction. 11/2/2016 11/2/2016 0.75 PROD1 DRILL TRIP P Continue running in the hole.Tie in to 6,984.0 7,855.0 00:00 00:45 the K1 for a-3.5 ft correction.Close EDC at the window.PUW=29KIbs. Continue in the hole to bottom. No issues. 11/2/2016 11/2/2016 3.00 PROD1 DRILL DRLG P BOBD. 1.40 bpm at 4,500 psi, BHP 7,855.0 8,104.0 00:45 03:45 4,145 psi,ROP 20-120 fph. 11/2/2016 11/2/2016 1.75 PROD1 DRILL DRLG P Motor stall at 8104 ft.PU and restart. 8,104.0 8,255.0 03:45 05:30 Stall a second time.PU and restart, continue drilling ahead. PUW 31 Klbs. 11/2/2016 11/2/2016 1.00 PROD1 DRILL WPRT P PUH for wiper trip.PUW=32,pulled 8,255.0 7,080.0 05:30 06:30 heavy negaitive DHWOB,CTSW=35 k,work area(clean),continue wiper up hole. 11/2/2016 11/2/2016 0.75 PROD1 DRILL WPRT P Jog/clean the 5" 7,080.0 7,500.0 06:30 07:15 11/2/2016 11/2/2016 0.85 PROD1 DRILL WPRT P Wiper back in hole RIW 10 k 7,500.0 8,255.0 07:15 08:06 11/2/2016 11/2/2016 3.50 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4,397 psi, BHP 8,255.0 8,543.0 08:06 11:36 4125,WHP 352,IA 238,OA 6 11/2/2016 11/2/2016 2.25 PROD1 DRILL WPRT T Unable to retrieve clean survey, 8,543.0 8,543.0 11:36 13:51 Perform DD wiper up hole to 7,997', perform 6 check shots up hole,PUW 32 k,RBIH to bottom,approved to drill another 30'per TE 11/2/2016 11/2/2016 1.00 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4,130 psi, BHP 8,543.0 8,655.0 13:51 14:51 4,142,WHP 352, IA 279,OA 6 11/2/2016 11/2/2016 0.75 PROD1 DRILL WPRT P Wiper up hole 7,550'for a tie in.PUW 8,655.0 7,550.0 14:51 15:36 32 k 11/2/2016 11/2/2016 0.25 PROD1 DRILL DLOG P Log the RA marker correction of plus 7,550.0 7,615.0 15:36 15:51 3.0' 11/2/2016 11/2/2016 0.50 PROD1 DRILL WPRT P Wiper back in hole 7,615.0 8,655.0 15:51 16:21 11/2/2016 11/2/2016 1.00 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4330 psi,BHP 8,655.0 8,667.0 16:21 17:21 4125,WHP 217, IA 219,OA 7 11/2/2016 11/2/2016 1.40 PROD1 DRILL WPRT T DD wiper up hole,PUW 29 k unable to 8,667.0 8,667.0 17:21 18:45 get a clean survey,discuss with town team,approved to drill to 8725 ft(95 ft past last clean survey at 8630 ft.) 11/2/2016 11/2/2016 0.50 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4530 psi,BHP 8,667.0 8,725.0 18:45 19:15 4125,WOB 1.7 Klbs,ROP 90-120 fph. Unable to obtain clean survey. Discuss with town.POOH to reconfigure BHA. 11/2/2016 11/2/2016 1.25 PROD1 DRILL TRIP T POOH with BHA#6.PUW=30 Klbs. 8,725.0 7,500.0 19:15 20:30 Pulled heavy at 7672 ft,7665 ft,7660 ft,7643 ft and 7611 ft.(-)7Klbs WOB. Worked BHA up into 5"casing. 11/2/2016 11/2/2016 0.75 PROD1 DRILL CIRC P Jog 5"casing. 7,500.0 7,060.0 20:30 21:15 Page 4/37 Report Printed: 12/29/2016 • 0 0 Operations Summary (with Timelog Depths) 1B-18 Goroc�ot'hillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/2/2016 11/3/2016 2.75 PROD1 DRILL TRIP P Continue POOH with BHA#6. Bump 7,060.0 74.0 21:15 00:00 up at surface and space out.Begin PUD BHA#6. 11/3/2016 11/3/2016 0.75 PROD1 DRILL PULD T Finish PUD BHA#6. Bit grade 3-3 74.0 0.0 00:00 00:45 11/3/2016 11/3/2016 0.75 PROD1 DRILL PULD T PD BHA#7 with a 0.5-°AKO motor 0.0 72.0 00:45 01:30 and RR BCC bit. 11/3/2016 11/3/2016 2.00 PROD1 DRILL TRIP T RBIH with BHA#7.Tie in to the K1 for 72.0 7,554.0 01:30 03:30 a-2.5 ft correction. 11/3/2016 11/3/2016 0.50 PROD1 DRILL TRIP T Stacked out at 7554 ft while RIH. 7,554.0 7,554.0 03:30 04:00 PUH. PUW=30 Klbs.Attempt to RBIH. Stack out at 7562 ft.Vary parameters to try and work through build section. 11/3/2016 11/3/2016 1.75 PROD1 DRILL TRIP T Continue RIH,obtaining check shot 7,554.0 8,725.0 04:00 05:45 surveys and resurvey 11/3/2016 11/3/2016 7.75 PROD1 DRILL DRLG T OBD 1.5 bpm at 4,080 psi,BHP 4276, 8,725.0 9,125.0 05:45 13:30 IA 155,OA 7 Mud swap,with new 8.6 ppg flopro mud at the bit at 9067 ft. 11/3/2016 11/3/2016 0.50 PROD1 DRILL WPRT T Wiper up hole PUW 27 k 9,125.0 8,125.0 13:30 14:00 11/3/2016 11/3/2016 0.50 PROD1 DRILL WPRT T Wiper back in hole.RIW 8 k 8,125.0 9,125.0 14:00 14:30 11/3/2016 11/3/2016 5.25 PROD1 DRILL DRLG T BOBD 1.5 bpm at 3,913 psi,BHP 9,125.0 9,254.0 14:30 19:45 4,233,WHP 623, IA 7,OA 10 11/3/2016 11/3/2016 0.25 PROD1 DRILL WPRT T BHA wiper.PUW=28 Klbs,SOW= 9,254.0 9,254.0 19:45 20:00 11.8 Klbs. 11/3/2016 11/4/2016 4.00 PROD1 DRILL DRLG T BOBD 1.5 bpm at 4100 psi,BHP 9,254.0 9,453.0 20:00 00:00 4,250,WHP 615, IA 7,OA 10 11/4/2016 11/4/2016 2.50 PROD1 DRILL DRLG T Continue crosscutting down through 9,453.0 9,500.0 00:00 02:30 section. 1.5 bpm at 4200 psi,BHP 4,200 Geologist called TD at 9500 feet. Pump TD sweeps. 11/4/2016 11/4/2016 2.75 PROD1 DRILL TRIP T POOH with BHA#7.PUW 29KIbs. 9,500.0 7,070.0 02:30 05:15 11/4/2016 11/4/2016 0.25 PROD1 DRILL WPRT T Jog the 5",pull tight at the tubing tail, 7,070.0 7,215.0 05:15 05:30 RBIH stacked out and stalled motor, jog again 11/4/2016 11/4/2016 2.25 PROD1 DRILL WPRT T Continue wiper to the swab valves. 7,215.0 72.0 05:30 07:45 11/4/2016 11/4/2016 1.75 PROD1 DRILL TRIP T Tag up at surface,reset counters,RIH 72.0 6,950.0 07:45 09:30 11/4/2016 11/4/2016 0.25 PROD1 DRILL DLOG T Log the K1 correction of minus 2.5' 6,950.0 6,975.0 09:30 09:45 11/4/2016 11/4/2016 1.00 PROD1 DRILL WPRT T Continue RIH to the EOB,POOH 6,975.0 7,855.0 09:45 10:45 11/4/2016 11/4/2016 1.25 PROD1 DRILL WPRT T PUH,cleaning build section,perform 7,855.0 7,070.0 10:45 12:00 jog above window,open EDC, jetting the 5" 11/4/2016 11/4/2016 0.25 PROD1 DRILL TRIP T Close EDC,wiper back in hole RIW 15 7,070.0 7,655.0 12:00 12:15 k,pull back up hole log RA. 11/4/2016 11/4/2016 0.25 PROD1 DRILL DLOG T Log the RA for no correction. 7,655.0 7,679.0 12:15 12:30 11/4/2016 11/4/2016 4.00 PROD1 DRILL TRIP T RBIH.Tag up at 9210 ft. Multiple 7,679.0 9,252.0 12:30 16:30 stalls.Work BHA down.Could not get deeper than 9252 ft. Page 5/37 Report Printed: 12/29/2016 0 • o 0 Operations Summary (with Timelog Depths) 1B-18 C� mitlips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time:,- End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/4/2016 11/4/2016 1.50 PROD1 DRILL TRIP T PUH to the window.Pulling heavy in 9,252.0 7,515.0 16:30 18:00 the build section.Work BHA up towards window. Tie in to the RA for a+5 ft correction. 11/4/2016 11/4/2016 0.75 PROD1 DRILL TRIP T RBIH.Could not work past 9269 ft. 7,515.0 9,269.0 18:00 18:45 11/4/2016 11/4/2016 3.75 PROD1 DRILL DISP T POOH pumping liner running pill. 9,269.0 72.0 18:45 22:30 Clean trip through build section. Paint window flag at 6472 ft. 11/4/2016 11/4/2016 0.50 PROD1 DRILL OWFF T Flow check at surface.Static. 72.0 72.0 22:30 23:00 11/4/2016 11/5/2016 1.00 PROD1 DRILL PULD T PJSM. LD BHA#7. 72.0 0.0 23:00 00:00 11/5/2016 11/5/2016 0.25 PROD1 DRILL DRLG T Finish LD BHA#7.Bit grade 1-2. 0.0 0.0 00:00 00:15 11/5/2016 11/5/2016 0.75 PROD1 DRILL BOPE T Function test BOPE. 0.0 0.0 00:15 01:00 11/5/2016 11/5/2016 4.50 COMPZ1 CASING PUTB T Prep floor to run liner.PU 29 joints 2- 0.0 0.0 01:00 05:30 3/8"slotted liner.PU/MU anchored billet assembly.MU CoilTrak tools. Stab injector. 11/5/2016 11/5/2016 1.50 COMPZ1 CASING RUNL T Bump up and reset counters.RIH with 0.0 7,369.0 05:30 07:00 liner on CT. 11/5/2016 11/5/2016 0.25 COMPZ1 CASING RUNL T Correct to the EOP flag at 6,400', 7,369.0 7,369.0 07:00 07:15 minus 5.2' 11/5/2016 11/5/2016 1.00 COMPZ1 CASING RUNL T Close EDC, PUW 29 k,continue RIH 7,369.0 8,315.0 07:15 08:15 to bottom 11/5/2016 11/5/2016 1.50 COMPZ1 CASING RUNL T Set down plus 7 k, DHWOB,PUH 8,315.0 8,315.0 08:15 09:45 minus 8 k,discuss with town,pull up to max with out initiating further setting,or damage to tools string. CTSW-45 k, DHWOB-minus 18 k, RBIH to neutral wieght 11/5/2016 11/5/2016 1.00 COMPZ1 CASING RUNL T WOO 8,315.0 8,315.0 09:45 10:45 11/5/2016 11/5/2016 2.00 COMPZ1 CASING TRIP T Bring pump up to shear 3,600 psi, 8,315.0 72.5 10:45 12:45 PUW 28 k,TOB at 7,412'.POOH 11/5/2016 11/5/2016 0.50 COMPZ1 CASING SFTY T Check well for flow,PJSM 72.5 0.0 12:45 13:15 11/5/2016 11/5/2016 0.75 COMPZ1 CASING PULD T LD,liner setting tools, 0.0 0.0 13:15 14:00 11/5/2016 11/5/2016 1.00 PROD1 RPEQPT PULD T Load WS into pipe shed,MU and 0.0 0.0 14:00 15:00 scibe tools,inspect Top Drive 11/5/2016 11/5/2016 1.00 PROD1 RPEQPT PULD T PU/MU/WS BHA#9 0.0 75.3 15:00 16:00 11/5/2016 11/5/2016 1.50 PROD1 RPEQPT TRIP T RIH,with WS,pumping min rate 0.3 75.3 6,950.0 16:00 17:30 bpm 11/5/2016 11/5/2016 0.25 PROD1 RPEQPT DLOG T log the K1 correction of-2.5 ft. 6,950.0 6,983.0 17:30 17:45 11/5/2016 11/5/2016 0.25 PROD1 RPEQPT TRIP T Position WS on depth.PUW=28 6,983.0 9,405.0 17:45 18:00 Klbs. 11/5/2016 11/5/2016 0.25 PROD1 RPEQPT WPST T Close EDC. Bring up pumps and set 9,405.0 9,405.0 18:00 18:15 anchors.Set down 5KIbs WOB to confirm set.Top of WS set at 7392 ft, oriented HS. 11/5/2016 11/5/2016 1.25 PROD1 RPEQPT TRIP T POOH with WS running tools. 9,405.0 73.0 18:15 19:30 11/5/2016 11/5/2016 0.50 PROD1 RPEQPT OWFF T Flow check at surface.Static. 73.0 73.0 19:30 20:00 Page 6/37 Report Printed: 12/29/2016 • • 04 Operations Summary (with Timelog Depths) 1B-18 CorxxoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/5/2016 11/5/2016 0.75 PROD1 RPEQPT PULD T PJSM, LD BHA#9. 73.0 0.0 20:00 20:45 11/5/2016 11/5/2016 1.25 PROD1 WHPST PULD T PJSM.PU BHA#10 with 0.6°AKO 0.0 75.0 20:45 22:00 motor and HCC DSM. 11/5/2016 11/5/2016 1.50 PROD1 WHPST TRIP T RIH with BHA#10. 75.0 6,950.0 22:00 23:30 11/5/2016 11/5/2016 0.25 PROD1 WHPST DLOG T Tie in to the K1 for a-4 correction 6,950.0 7,000.0 23:30 23:45 11/5/2016 11/6/2016 0.25 PROD1 WHPST TRIP T Continue to RIH with BHA#10. Begin 7,000.0 7,371.0 23:45 00:00 displacing well to drilling fluid. 11/6/2016 11/6/2016 1.25 PROD1 WHPST CIRC T Displace well from completion fluid to 7,371.0 7,371.0 00:00 01:15 FloPro drilling fluid. **Adjust for daylight savings time*** 11/6/2016 11/6/2016 0.25 PROD1 WHPST WPST T RIH and dry tag WS at 7395 ft(TOWS 7,371.0 7,392.0 01:15 01:30 7392 ft).Begin milling window per procedure. 11/6/2016 11/6/2016 7.00 PROD1 WHPST WPST T Begin milling window per procedure. 7,392.0 7,401.0 01:30 08:30 11/6/2016 11/6/2016 1.50 PROD1 WHPST WPST T Continue milling with string reamer @ 7,401.0 7,403.0 08:30 10:00 1.4 fph, 11/6/2016 11/6/2016 4.00 PROD1 WHPST WPST T Drill rathole towards TD 7417', 1.45 7,403.0 7,417.0 10:00 14:00 bpm at 3840 psi,BHP 4023,WHP 403,IA 61,OA 9 11/6/2016 11/6/2016 1.50 PROD1 WHPST WPST T Back Ream window 0°,30°ROHS, 7,417.0 7,292.0 14:00 15:30 30°LOHS,and 0° 11/6/2016 11/6/2016 0.25 PROD1 WHPST WPST T PUH,and dry drift window area. 7,292.0 7,417.0 15:30 15:45 11/6/2016 11/6/2016 2.00 PROD1 WHPST WPST T POOH,pumping 1.45 bpm at 3,900 7,417.0 70.0 15:45 17:45 psi,BHP 4,029,WHP 417, IA 97,OA 0 11/6/2016 11/6/2016 1.50 PROD1 WHPST PULD T PJSM.PUD BHA#10.Crew change. 70.0 0.0 17:45 19:15 Finish PUD. Mill gauge 2.79"no-go. 11/6/2016 11/6/2016 2.00 PROD1 DRILL PULD T PJSM,PD Build BHA#11 with 1.7° 0.0 74.0 19:15 21:15 AKO motor and HCC bit. 11/6/2016 11/7/2016 2.75 PROD1 DRILL TRIP T Bump up and reset counters.RIH with 74.0 7,437.0 21:15 00:00 BHA#11.Log the K1 for a-3 ft correction.Close EDC.PUW at the window=37 Klbs. 11/7/2016 11/7/2016 6.75 PROD1 DRILL DRLG T BOBD.Pumping 1.45 bpm at 4200 7,437.0 7,562.0 00:00 06:45 psi.WOB=2-3 Klbs.CTW=12.5 Klbs,BHP=4140 psi.ROP=5-80 fph. Some stalls observed while drilling this interval. 11/7/2016 11/7/2016 2.75 PROD1 DRILL TRIP T POOH,perform jog in the 5"with open 7,562.0 72.2 06:45 09:30 EDC 11/7/2016 11/7/2016 1.25 PROD1 DRILL PULD T OOH,PJSM,PUD and LD build 72.2 0.0 09:30 10:45 section BHA#11 11/7/2016 11/7/2016 1.00 PROD1 DRILL SVRG T Service INJH,change oil in TOP 0.0 0.0 10:45 11:45 Drive. 11/7/2016 11/7/2016 1.25 PROD1 DRILL PULD T PJSM,PD second build section BHA# 0.0 72.2 11:45 13:00 12 with 2.3°motor and RR HCC bi- center bit. 11/7/2016 11/7/2016 2.00 PROD1 DRILL TRIP T RIH,slowing down 20 fpm pass 72.2 6,950.0 13:00 15:00 jewlery. Page 7/37 Report Printed: 12/29/2016 • • 0 ..' , w Operations Summary (with Timelog Depths) 1B-18 Com:m*11i110s Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time 'End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/7/2016 11/7/2016 0.45 PROD1 DRILL DLOG T Log the K1 marker correction of minus 6,950.0 6,977.0 15:00 15:27 3.0',continue RIH to log RA marker. 11/7/2016 11/7/2016 0.30 PROD1 DRILL DLOG T Log the RA no correction 6,977.0 7,432.0 15:27 15:45 TOWS=7,392.15' BOW=7,401' RA=7399.5' 11/7/2016 11/7/2016 0.30 PROD1 DRILL TRIP T Continue RIH to bottom 7,432.0 7,562.0 15:45 16:03 11/7/2016 11/7/2016 5.25 PROD1 DRILL DRLG T OBD 1.45 bpm at 4035 psi FS,BHP 7,562.0 7,599.0 16:03 21:18 4108,WHP 380, IA 0,OA 7 11/7/2016 11/7/2016 0.25 PROD1 DRILL WPRT T Wiper up hole PUW 29 k 7,599.0 7,476.0 21:18 21:33 11/7/2016 11/7/2016 0.25 PROD1 DRILL WPRT T Wiper back in hole,RIW 15 k 7,476.0 7,599.0 21:33 21:48 11/7/2016 11/8/2016 2.20 PROD1 DRILL DRLG T BOBD 1.45 bpm at 3950 psi,BHP 7,599.0 7,693.0 21:48 00:00 4141,WHP 437,IA 220,OA 10 11/8/2016 11/8/2016 2.00 PROD1 DRILL DRLG T BOBD 1.45 bpm at 3950 psi,BHP 7,693.0 7,800.0 00:00 02:00 4150,WHP 437,IA 220,OA 10 End of build at 7800 ft. 11/8/2016 11/8/2016 2.00 PROD1 DRILL TRIP T POOH with BHA#12.PUW=30KIbs. 7,800.0 70.0 02:00 04:00 11/8/2016 11/8/2016 1.50 PROD1 DRILL PULD T PUD and LD BHA#12. 70.0 0.0 04:00 05:30 11/8/2016 11/8/2016 1.50 PROD1 DRILL PULD T PD BHA#13 with 0.46°AKO motor 0.0 72.0 05:30 07:00 and new HYC bit. 11/8/2016 11/8/2016 2.75 PROD1 DRILL TRIP T RIH with BHA#13. 72.0 6,950.0 07:00 09:45 11/8/2016 11/8/2016 0.25 PROD1 DRILL DLOG T Log K1 for a-2.5 ft correction. 6,950.0 7,000.0 09:45 10:00 11/8/2016 11/8/2016 0.75 PROD1 DRILL TRIP T Continue running in the hole to 7,000.0 7,800.0 10:00 10:45 bottom.PUW at the window=27Klbs, Close EDC.Clean trip through window and open hole. 11/8/2016 11/8/2016 10.14 PROD1 DRILL DRLG T BOBD.Pumping 1.4 bpm at 4230 psi. 7,800.0 8,210.0 10:45 20:53 WOB=1.5Klbs.CTW=13.5KIbs. BHP=4190 psi. 11/8/2016 11/8/2016 0.55 PROD1 DRILL WPRT T Wiper Trip Uphole.PUW=25k 8,210.0 7,000.0 20:53 21:26 Pumped a 5/5 pill sweep before PUH made several jogs in 5"casing 11/8/2016 11/8/2016 0.27 PROD1 DRILL TRIP T Trip back in hole 7,000.0 7,385.0 21:26 21:42 11/8/2016 11/8/2016 0.30 PROD1 DRILL DLOG T Log the RA Tag at 7,400'and make a 7,420.0 7,420.0 21:42 22:00 correction of+2' 11/8/2016 11/8/2016 0.45 PROD1 DRILL TRIP T Trip back in hole 7,420.0 8,210.0 22:00 22:27 11/8/2016 11/9/2016 1.54 PROD1 DRILL DRLG T BOBD. Pumping 1.4 bpm at 4251 psi. 8,210.0 8,218.0 22:27 00:00 WOB=2.25Klbs.CTW=10.5Klbs. BHP=4210 psi.ROP=4.7 to 6.5 fph 11/9/2016 11/9/2016 2.00 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4321 psi. 8,218.0 8,236.0 00:00 02:00 WOB=2.32Klbs.CTW=11.4KIbs. BHP=4220 psi.ROP=4.0 FPH 11/9/2016 11/9/2016 6.50 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4379 psi. 8,236.0 8,323.0 02:00 08:30 WOB= 1.32Klbs.CTW=10.8 Klbs. BHP=4230 psi.ROP=7.5 to 30 FPH Page 8/37 Report Printed: 12/29/2016 zillil • • Operations Summary (with Timelog Depths) 0 1B-18 ConocoP'hillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftK8) End Depth(ftKB) 11/9/2016 11/9/2016 0.25 PROD1 DRILL WPRT T Short wiper. PUW=28k 8,323.0 8,200.0 08:30 08:45 11/9/2016 11/9/2016 0.25 PROD1 DRILL WPRT T RBIH.SOW=12k 8,200.0 8,323.0 08:45 09:00 Clean trip in and out. 11/9/2016 11/9/2016 9.00 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4379 psi. 8,323.0 8,426.0 09:00 18:00 WOB=1.32Klbs.CTW=10.8 Klbs. BHP=4230 psi.ROP=7.5 to 30 FPH 11/9/2016 11/9/2016 3.00 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4364 psi. 8,426.0 8,503.0 18:00 21:00 WOB=1.39Klbs.CTW=13.5 Klbs. BHP=4254 psi.ROP=20 to 30 FPH 11/9/2016 11/10/2016 3.00 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4457 psi. 8,503.0 8,574.0 21:00 00:00 WOB=2.10KIbs.CTW=10.5 Klbs. BHP=4260 psi.ROP=20 to 44 FPH 11/10/2016 11/10/2016 1.19 PROD1 DRILL DRLG T OBD.Pumping 1.4 bpm at 4257 psi. 8,574.0 8,590.0 00:00 01:11 WOB=1.63KIbs.CTW=8.8 Klbs. BHP=4320 psi.ROP=07 to 18 FPH Pump a 5 x 5 Hi/Lo Vis Pill prior to beginning wiper trip 11/10/2016 11/10/2016 0.38 PROD1 DRILL DRLG T Wiper trip up hole. Initiate a 1,000 ft 8,590.0 7,598.0 01:11 01:34 wiper trip 20 ft earlier than planned due to very low ROP(<10 fph) PUW =25K 11/10/2016 11/10/2016 0.48 PROD1 DRILL DRLG T Trip back in hole. RIW=9.3K 7,598.0 8,590.0 01:34 02:03 11/10/2016 11/10/2016 4.45 PROD1 DRILL DRLG T BOBD. Pumping 1.4 bpm at 4209 psi. 8,590.0 8,630.0 02:03 06:30 WOB=2.03KIbs.CTW=9.3 Klbs. BHP=4282 psi.ROP=6 to 16 FPH Initiate swapping to a new mud system....switching from FlowVis to 8.7 ppbPowerPro w/3%KlaStop and 6%KCL New mud at the bit at 8,596'@ 0242 hrs 11/10/2016 11/10/2016 0.25 PROD1 DRILL WPRT T BHA Wiper.PUW=27 Klbs 8,630.0 8,467.0 06:30 06:45 11/10/2016 11/10/2016 0.25 PROD1 DRILL WPRT T RBIH.SOW 13 Klbs. 8,467.0 8,630.0 06:45 07:00 11/10/2016 11/10/2016 2.25 PROD1 DRILL DRLG T BOBD. Pumping 1.67 bpm at 4300 8,630.0 8,685.0 07:00 09:15 psi.WOB=1.7Klbs.CTW=13 Klbs. BHP=4280 psi.ROP=10 to 25 FPH 11/10/2016 11/10/2016 2.75 PROD1 DRILL TRIP T Discuss with town.Made decision to 8,685.0 72.0 09:15 12:00 POOH and c/o bit and BHA. POOH.PUW=26 Klbs. Clean trip out of the hole. 11/10/2016 11/10/2016 1.75 PROD1 DRILL PULD T PJSM.PUD BHA#13.Bit grade 2-2. 72.0 0.0 12:00 13:45 11/10/2016 11/10/2016 1.50 PROD1 DRILL CTOP T Change out UQC.Test e-line. 0.0 0.0 13:45 15:15 11/10/2016 11/10/2016 0.25 PROD1 DRILL CTOP T Change out stripper pack off. 0.0 0.0 15:15 15:30 11/10/2016 11/10/2016 1.68 PROD1 DRILL PULD T PD BHA#14 with 0.5°AJO 0.0 72.0 15:30 17:10 Weatehrford motor and new HYC bit. Resistivity moved below the DGS. Page 9/37 Report Printed: 12/29/2016 tz„,,,,, • • 0 Operations Summary (with Timelog Depths) ,e.,,, ...... 1B-18 ilIi Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time-. End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/10/2016 11/10/2016 1.88 PROD1 DRILL TRIP T RBIH with open EDC pumping at 72.0 6,959.0 17:10 19:03 minimum rate. SOW=7.9 K 11/10/2016 11/10/2016 0.36 PROD1 DRILL DLOG T Log for K1 Marker and make 6,959.0 7,000.0 19:03 19:25 correction of+6.5 FT. Close EDC 11/10/2016 11/10/2016 0.87 PROD1 DRILL TRIP T Resume RIH 7,000.0 8,685.0 19:25 20:17 WT CK @ 7,350'=25K Slow down to 28 fpm while in build section 11/10/2016 11/11/2016 3.71 PROD1 DRILL DRLG T BOBD.Pumping 1.28 bpm at 4272 8,685.0 8,853.0 20:17 00:00 psi.WOB=1.2Klbs.CTW=12.4 Klbs. BHP=4180 psi.ROP=40 to 51 FPH **Perform a BHA wiper trip right before midnight to help clean out hole having difficulty getting the bit to turn. 11/11/2016 11/11/2016 1.00 PROD1 DRILL DRLG T BOBD. Pumping 1.28 bpm at 4272 8,853.0 8,886.6 00:00 01:00 psi.WOB=2.2Klbs.CTW=12.4 Klbs. BHP=4180 psi.ROP=40 to 51 FPH **Perform a BHA wiper trip right before midnight to help clean out hole having difficulty getting the bit to turn.Now having to stack considerable WOB to help facilitate turning Geo's can work with what we're getting 11/11/2016 11/11/2016 0.94 PROD1 DRILL WPRT T PUH slowly and confer with town 8,886.6 8,540.0 01:00 01:56 engineer and town GEO having difficulty getting the bit to turn up with trying numerous options not getting sufficent enough turn to facilitate making our next target which is critical. Waiting for town to decide on course of action,so still PUH slowly PUW=27.3K 11/11/2016 11/11/2016 0.20 PROD1 DRILL TRIP T Recieved word from town engineer to 8,540.0 8,886.0 01:56 02:08 proceed forward and"aggressively try and make next target at 6,645".Start RBIH SOW=11.5 11/11/2016 11/11/2016 2.86 PROD1 DRILL DRLG T BOBD.Pumping 1.18 bpm at 4072 8,886.0 8,986.0 02:08 05:00 psi.WOB=3.1 Klbs.CTW=-1.2 Klbs. BHP=4140 psi.ROP=40 to 54 FPH 11/11/2016 11/11/2016 4.00 PROD1 DRILL DRLG T OBD.Pumping 1.14 bpm at 3962 psi. 8,986.0 9,080.0 05:00 09:00 WOB=2.3Klbs.CTW=-3.5 Klbs. BHP=4299 psi.ROP=40 fph 11/11/2016 11/11/2016 1.50 PROD1 DRILL DRLG T OBD.Pumping 1.14 bpm at 3962 psi. 9,080.0 9,098.0 09:00 10:30 WOB=2.3Klbs.CTW=-3.5 Klbs. BHP=4300 psi.ROP decreasing to <5fph. Multiple pick ups and restarts to try and improve ROP. Page 10/37 Report Printed: 12/29/2016 '=' Operations Summary (with Timelog Depths) O 1B-18 C n coPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code. Time P-T-X Operation (ftKB) End Depth(ftKB) 11/11/2016 11/11/2016 3.00 PROD1 DRILL TRIP T After discussion with town.Decision 9,098.0 68.0 10:30 13:30 made to POOH.PUW=29 Klbs. Jog 5"window area.Open EDC. Continue out of the hole. 11/11/2016 11/11/2016 2.00 PROD1 DRILL PULD T PJSM.PUD BHA#14. 68.0 0.0 13:30 15:30 11/11/2016 11/11/2016 2.25 PROD1 STK PULD T PJSM. PD BHA#15,Anchored billet 0.0 72.0 15:30 17:45 assembly. 11/11/2016 11/11/2016 1.82 PROD1 STK TRIP T RIH with Anchored Billet 72.0 6,959.0 17:45 19:34 Assembly 11/11/2016 11/11/2016 0.22 PROD1 STK DLOG T Logging for K1 Marker and make 6,959.0 7,086.0 19:34 19:47 correction of-3 ft correction. 11/11/2016 11/11/2016 0.17 PROD1 STK TRIP T Continue RIH with Anchored Billett 7,086.0 7,350.0 19:47 19:57 11/11/2016 11/11/2016 0.06 PROD1 STK TRIP T Stop here.Offline with pump.Close 7,350.0 7,350.0 19:57 20:01 EDC. WT CK=27k 11/11/2016 11/11/2016 0.20 PROD1 STK TRIP T Continue RIH with Anchored Billett 7,350.0 7,480.0 20:01 20:13 11/11/2016 11/11/2016 0.68 PROD1 STK TRIP T Starting to get some noticable weight 7,480.0 7,480.0 20:13 20:54 bobbles after 7,456 ft.and eventually setting down too much weight at 7,480 ft.Tried jogging through area and other different options,but ultimately could not get past 7,480 ft.Did not want to get western with the billet due to proximity to the window and distance from target set depth.Confer with town engineer and he agreed we should POOH and do a clean up run. Once OOH,we will do the BOP Test before the clean up run. 11/11/2016 11/11/2016 0.90 PROD1 STK TRIP T Start to POOH and dragging too much 7,480.0 7,383.0 20:54 21:48 weight hopefully the dogs are not sticking out work the billet up and down slowly and are eventually able to start POOH albeit slowly 11/11/2016 11/11/2016 0.12 PROD1 STK TRIP T Stop here to open EDC and bring 7,383.0 7,383.0 21:48 21:55 pump online at.75 bpm 11/11/2016 11/12/2016 2.08 PROD1 STK TRIP T Resume POOH pumping at.75 bpm, 7,383.0 72.3 21:55 00:00 CP=2,442 PUW=28k WHP=841 BHP=3,805 11/12/2016 11/12/2016 1.75 PROD1 STK PULD T At surface.PUD and LD BHA#15. 68.2 0.0 00:00 01:45 11/12/2016 11/12/2016 1.50 PROD1 STK PULD T Pull floats,MU nozzle.Stab on 0.0 0.0 01:45 03:15 lubricator.Flush stack. 11/12/2016 11/12/2016 0.75 PROD1 STK BOPE T Pressure test inner reel valve and 0.0 0.0 03:15 04:00 pack off. 11/12/2016 11/12/2016 2.00 PROD1 STK SVRG T Change out bales on TD.Grease 0.0 0.0 04:00 06:00 stack and choke manifold.Change out 4 foot riser. 11/12/2016 11/12/2016 10.50 PROD1 STK BOPE T Perform BOP Test after PJSM and 0.0 06:00 16:30 after tree is serviced,stack flushed out,coil displaced with water. Restest master after greasing. 11/12/2016 11/12/2016 2.27 PROD1 STK BOPE T BOP Test complete.P/U BHA#16 0.0 62.3 16:30 18:46 w/2.80"Ridge Set Mill 11/12/2016 11/12/2016 2.00 PROD1 STK PULD T Pressure Deploy BHA#16 62.3 62.3 18:46 20:46 Page 11/37 Report Printed: 12/29/2016 1110 • 0. 0 Operations Summary (with Timelog Depths) 1B-18 Conoco Phillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/12/2016 11/12/2016 1.93 PROD1 STK TRIP T RIH pumping at.5 bpm with open 62.3 6,943.0 20:46 22:42 EDC First 5 x 5 Gel sweep pumped 11/12/2016 11/12/2016 0.40 PROD1 STK DLOG T Log for K1 Marker and make 6,943.0 6,974.0 22:42 23:06 correction of-2 ft 11/12/2016 11/12/2016 0.08 PROD1 STK TRIP T Continue RIH for clean out run 6,972.0 7,522.0 23:06 23:10 Second 5 x 5 gel pill launched Close EDC at 7,380 ft Reciprocate pipe through 5"to clean area while first pill is exiting coil First sweep back to shakers brought cuttings to surface. 11/12/2016 11/13/2016 0.82 PROD1 STK REAM T Hit hard tag at 7,522 ft. Reciprocate 7,522.0 7,546.0 23:10 00:00 pipe through this area trying to break through pass 7,522 ft only to tag up at 7,533 ft PUH and RBIH pump third sweep getting about 2 feet deeper with each bite very slow going PUWs are between 25 and 35k 11/13/2016 11/13/2016 1.82 PROD1 STK REAM T Still cleaning cuttings out of build 7,546.0 8,561.0 00:00 01:49 section by taking 50'bites after breaking through last fill tag at 7,548 ft. 11/13/2016 11/13/2016 1.13 PROD1 STK REAM T Tag something at 8,565.0 ft. 8,561.0 8,589.0 01:49 02:57 Slowly work past this depth and continue RIH to 8,589 ft and unable to go any further.PUW exceeded 50k and-15k on WOB ID of hole seems to have swollen doesn't act like fill.Confer with town engineer or setting billet higher than 8,650 ft. Waiting on return call with plan forward. 11/13/2016 11/13/2016 3.05 PROD1 STK TRIP T Engineer called back and said billet 8,589.0 62.0 02:57 06:00 would be set higher,but currently has not decided on a depth yet.Continue POOH chasing returns to surface as planned(pumping sweeps,jogging through 5"and again at surface). Begin POOH. PUW=27K Make several jogs through 5" 11/13/2016 11/13/2016 1.75 PROD1 STK PULD T PUD and LD BHA#16.Packed clay 62.0 0.0 06:00 07:45 and cuttings observed in the mill junk slot area. 11/13/2016 11/13/2016 1.75 PROD1 STK PULD T PJSM.PD BHA#17,anchored billet 0.0 72.0 07:45 09:30 assembly. 11/13/2016 11/13/2016 1.75 PROD1 STK TRIP T RIH with BHA#17. 72.0 6,960.0 09:30 11:15 11/13/2016 11/13/2016 0.25 PROD1 STK DLOG T Log K1 for a-1.5 ft correction. 6,960.0 6,985.0 11:15 11:30 11/13/2016 11/13/2016 1.00 PROD1 STK TRIP T Continue RIH with anchored billet. 6,985.0 8,462.0 11:30 12:30 Weight check at the window=28Klbs PUW. Page 12/37 Report Printed: 12/29/2016 Operations Summary (with Timelog Depths) a 1B-18 ConocoPhitrps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/13/2016 11/13/2016 0.25 PROD1 STK WPST T Position billet on depth(TOB=8450 8,462.0 8,462.0 12:30 12:45 ft,oriented 25°LOHS).Bring pump up.Setting tool sheared at 4600 psi. Set 5klbs down and confirmed set. 11/13/2016 11/13/2016 1.25 PROD1 STK TRIP T POOH with BHA#17. 8,462.0 72.0 12:45 14:00 11/13/2016 11/13/2016 1.80 PROD1 STK PULD T PJSM.PUD BHA#17. 72.0 0.0 14:00 15:48 11/13/2016 11/13/2016 1.35 PROD1 DRILL PULD T PJSM, PD BHA#18 with 0.85°AKO 0.0 72.0 15:48 17:09 motor and RB HCC bit. 11/13/2016 11/13/2016 1.68 PROD1 DRILL TRIP T RIH with EDC open pumping minimum 72.0 6,952.0 17:09 18:49 rate 11/13/2016 11/13/2016 0.21 PROD1 DRILL DLOG T Log for K1 Marker and make 6,952.0 6,980.0 18:49 19:02 correction of-2 ft 11/13/2016 11/13/2016 0.88 PROD1 DRILL TRIP T Resume RIH pumping at minimum 6,980.0 8,450.2 19:02 19:55 rate RIW= 14.5K 11/13/2016 11/13/2016 1.97 PROD1 DRILL KOST T Tag top of billet PUH and 8,450.2 8,450.2 19:55 21:53 perform a 100'wiper trip to ensure clean BHA RBIH and lightly set down on top of billet to begin milling having major wieght transfer issues 7 stalls so far still trying different tactics too much friction and too many stalls 11/13/2016 11/13/2016 0.35 PROD1 DRILL WPRT T Perform a wiper trip to the window and 8,450.2 7,444.0 21:53 22:14 mix a lube pill to pump so as to be back on bottom when pill comes out 11/13/2016 11/13/2016 0.40 PROD1 DRILL TRIP T RBIH 7,444.0 8,449.2 22:14 22:38 11/13/2016 11/14/2016 1.36 PROD1 STK KOST T BOBM.Still having weight transfer 8,449.2 8,449.2 22:38 00:00 issues and trying different tactics such as different pump rates,backreaming passes,wiper trips,different speeds, changing tool face,etc.with no luck. Still getting stalls. Have tried pumping a 20 bbl lube pill which seems to be helping somewhat 11/14/2016 11/14/2016 3.58 PROD1 STK KOST T Continuing to try and kick off billet at 8,449.2 8,449.2 00:00 03:34 8,450 ft.Still working with lube pill and trying different tactics.Have tried backreaming,moving the tool face orietation,different pump rates, speeds and tried 3 different drillers. Having weight transfer issues.Have now pumped beads to help with weight transfer Page 13/37 Report Printed: 12/29/2016 Operations Summary (with Timelog Depths) 0 1B-18 hitrps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/14/2016 11/14/2016 3.92 PROD1 STK KOST T After the first 7 bbls of beads are out, 8,449.2 8,457.0 03:34 07:30 we start to get some weight transfer able to gently tag billet and start milling starting to lose weight again PUH for a short wiper and RBIH and try again impossible to get weight transfer without beads continue drilling,but periodically lose WOB Multiple pick ups and restarts. Rate=1.41 bpm,Circ Press=3,541, WHP=608, IA=38,OA=07, CTW= 13.9K, WOB=.08 to.46 k 11/14/2016 11/14/2016 2.50 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.5 8,457.0 8,508.0 07:30 10:00 bpm at 4000 psi.BHP=4280 psi, WOB=0.5-0.8Klbs ROP 10-30 fph. 11/14/2016 11/14/2016 0.25 PROD1 DRILL WPRT T PUH and dry drift kick off area.PUW= 8,508.0 8,450.0 10:00 10:15 26Klbs. Dry drift clean. 11/14/2016 11/14/2016 3.25 PROD1 DRILL WPRT T Continue to PUH into 5"casing and 8,450.0 7,050.0 10:15 13:30 jog area.Choke B plugging up with cuttings and aluminum. Clean and clear both Choke B and choke A. Significant amount of aluminum observed over the shakers. 11/14/2016 11/14/2016 1.00 PROD1 DRILL WPRT T RBIH.Clean trip through window and 7,050.0 8,508.0 13:30 14:30 open hole. 11/14/2016 11/14/2016 1.00 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.45 8,508.0 8,574.0 14:30 15:30 bpm at 4300 psi.BHP=4290 psi, WOB= 1.0KIbs ROP 50-80 fph. 11/14/2016 11/14/2016 0.25 PROD1 DRILL WPRT T PUH for short wiper to 8500,PUW= 8,574.0 8,574.0 15:30 15:45 27KIbs. 11/14/2016 11/14/2016 2.00 PROD1 DRILL DRLG T Continue drilling ahead.Pumping 1.6 8,574.0 8,810.0 15:45 17:45 bpm at 4300 psi.BHP=4290 psi, WOB=1.9KIbs ROP 20-50 fph. 11/14/2016 11/14/2016 2.75 PROD1 DRILL WPRT T PUH for planned wiper trip. PUW= 8,810.0 7,808.0 17:45 20:30 27KIbs 11/14/2016 11/14/2016 0.50 PROD1 DRILL WPRT T RBIH.SOW 11 Klbs. 7,808.0 8,809.0 20:30 21:00 11/14/2016 11/15/2016 3.00 PROD1 DRILL DRLG T Continue drilling ahead.Pumping 1.6 8,809.0 8,910.0 21:00 00:00 bpm at 4300 psi.BHP=4290 psi, WOB=1.9KIbs ROP 20-50 fph. 11/15/2016 11/15/2016 5.10 PROD1 DRILL DRLG T Continue drilling ahead.Pumping 1.6 8,910.0 9,110.0 00:00 05:06 bpm at 4289 psi. BHP=4320 psi, WOB=1.8KIbs ROP 20-80 fph. Launch 5 x 5 Sweep pill prior to PUH for wiper trip 11/15/2016 11/15/2016 1.77 PROD1 DRILL WPRT T Perform wiper trip to 5"TT and 9,110.0 7,069.0 05:06 06:52 perform several jogs in 5"casing 11/15/2016 11/15/2016 1.22 PROD1 DRILL TRIP T Trip back in hole 7,069.0 9,110.0 06:52 08:05 11/15/2016 11/15/2016 5.98 PROD1 DRILL DRLG T BOB drilling ahead.Pumping 1.5 bpm 9,110.0 9,374.8 08:05 14:04 at 4272 psi.BHP=4294 psi,WOB= 1.2KIbs ROP 20-80 fph. Page 14/37 Report Printed: 12/29/2016 • I ~' Operations Summary (with Timelog Depths) 0 1B-18 Conoce Phillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/15/2016 11/15/2016 0.65 PROD1 DRILL WPRT T Perform 1,000 ft wiper trip a little 9,374.8 8,360.0 14:04 14:43 earlier than planned due to losing push ability pumped a sweep pill pill brought back sticky clay and some shale 11/15/2016 11/15/2016 0.66 PROD1 DRILL WPRT T Trip back in hole 8,360.0 9,374.8 14:43 15:22 **Note:Town engineer called and would like us to keep an eye on two hot spots and make note in WSR if any issue noticed 8,950 ft and 9,163 ft. Notified the day driller Greg also. 11/15/2016 11/15/2016 5.62 PROD1 DRILL DRLG T BOB drilling ahead.Pumping 1.65 9,374.9 9,469.0 15:22 21:00 bpm at 4172 psi. BHP=4344 psi, WOB=1.0KIbs ROP 20-30 fph. Swapping to new mud system(#4)at 9,389 ft.Around 1,500 ft on System#3 with.8%DS. 11/15/2016 11/15/2016 2.00 PROD1 DRILL DRLG T OBD 1.65 bpm at 3,993 psi FS,BHP 9,469.0 9,500.0 21:00 23:00 4,355 psi,CWT-7k,WOB.9k,ROP 7, weight transfer issue,high gama sinse 9,340 ft,confer with town,pumped 25 bbl Drill Zone pill,little help,make up and pump staggered beaded pills. 11/15/2016 11/16/2016 1.00 PROD1 DRILL DRLG P 9,500 ft OBD 1.65 bpm at 3,993 psi 9,500.0 9,516.0 23:00 00:00 FS,BHP 4,367 psi,WOB.8, ROP 20- 30 "Note:off trouble time 11/16/2016 11/16/2016 4.60 PROD1 DRILL DRLG P OBD 1.65 bpm at 3,993 psi FS, BHP 9,516.0 9,582.0 00:00 04:36 4,368 psi,CWT-4.5k,WOB.8k, continue staggered beaded pill sweeps,several restarts,BHA wipers, PUW's consistant 28k to 29k,pump 5x5 sweep 11/16/2016 11/16/2016 1.25 PROD1 DRILL WPRT P Early wiper to window,PUW 29k, 9,582.0 7,069.0 04:36 05:51 Make several jogs in 5" 11/16/2016 11/16/2016 0.25 PROD1 DRILL WPRT P Wiper back in hole 7,069.0 7,410.0 05:51 06:06 11/16/2016 11/16/2016 0.20 PROD1 DRILL DLOG P Log for RA Tag and make correction 7,410.0 7,428.0 06:06 06:18 of+5 ft. 11/16/2016 11/16/2016 1.20 PROD1 DRILL WPRT P Continue RBIH 7,428.0 8,889.0 06:18 07:30 11/16/2016 11/16/2016 1.30 PROD1 DRILL WPRT P Having to work through tight spot from 8,889.0 8,956.0 07:30 08:48 8,889 to 8,946 ft changing tool face and pump rates seemed to help. Appeared to be more hole geometry and swollen clays than cuttings until we hit 8,946 ft where it looks like we have a bed of cuttings had a 12k overpull here town called and said to work down throough area and work back up cleaning up this tight spot Page 15/37 Report Printed: 12/29/2016 0 0Operations Summary (with Timelog Depths) 1B-18 Conocc hitlips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/16/2016 11/16/2016 0.70 PROD1 DRILL WPRT P Town called back and said since we 8,956.0 9,582.0 08:48 09:30 made it through this tight area to head to bottom and continue drilling until they call back heading to bottom 11/16/2016 11/16/2016 8.50 PROD1 DRILL DRLG P BOBD 1.60 bpm at 4,027 psi FS, BHP 9,582.0 9,701.0 09:30 18:00 4,325 psi,CWT-3.5k,WOB.5k, continue staggered beaded pill sweeps,several restarts,BHA wipers, PUW's consistant 29k to 30k. Avg ROP=14 fph 11/16/2016 11/17/2016 6.00 PROD1 DRILL DRLG P OBD 1.6 bpm at 4,190 psi FS, BHP 9,701.0 9,819.0 18:00 00:00 4,268 psi,CWT-9.8k,WOB.5k,ROP 18,continue beaded pills, PUW's 26k to 28k,added 1%LoTorc lube to system,seeing better CWT.0k,WOB 1.1k to 1.5k,ROP 19 11/17/2016 11/17/2016 4.00 PROD1 DRILL DRLG P Continue drilling ahead 1.6 bpm at 9,819.0 9,980.0 00:00 04:00 4,450 psi FS,BHP 4,370 psi, CWT.0k,WOB 1.1k 11/17/2016 11/17/2016 0.40 PROD1 DRILL WPRT P Wiper trip up hole 900 ft,PUW 26k 9,982.0 9,082.0 04:00 04:24 11/17/2016 11/17/2016 0.55 PROD1 DRILL WPRT P Wiper trip back in hole,slow speed to 9,082.0 9,982.0 04:24 04:57 30 fpm at.8 bpm to work past 9,465 ft to 9,485 ft,continue in hole. 11/17/2016 11/17/2016 14.95 PROD1 DRILL DRLG P BOBD 1.61 bpm at 4,417 psi FS,BHP 9,982.0 10,200.0 04:57 19:54 4,306 psi,CWT 3k,WOB.7k,ROP 10 to 30 11/17/2016 11/17/2016 1.20 PROD1 DRILL CIRC P 10,200 ft.TD called,reciprocate pipe, 10,200.0 10,200.0 19:54 21:06 PUW 26k while pumping last of beaded pill,build Hi/Lo vis sweeps, pump 10x10 Lo/Hi sweep. 11/17/2016 11/17/2016 1.80 PROD1 DRILL WPRT P Chase sweeps to window,PUW 25k, 10,200.0 7,070.0 21:06 22:54 slow thru window 6 fpm at,5 bpm. 11/17/2016 11/17/2016 0.95 PROD1 DRILL WPRT P Jet/jog 5"7,370 ft to 7,070 ft 2 times, 7,070.0 7,370.0 22:54 23:51 wait for heavy returns to clean up over shaker,pump 10x10. 11/17/2016 11/18/2016 0.15 PROD1 DRILL WPRT P RBIH to 7,575 ft. 7,370.0 7,575.0 23:51 00:00 11/18/2016 11/18/2016 2.85 PROD1 DRILL WPRT P Continue RIH from 7,575 ft to 8,005 ft, 7,575.0 72.2 00:00 02:51 chase 10x10 sweeps to 5"and Jet/jog 5"7,370 ft to 7,070 ft 2 times,wait for returns to clean up,continue wiper to swab,200 ft jog at surface. 11/18/2016 11/18/2016 1.90 PROD1 DRILL TRIP P Bump up,reset counters,RBIH to 72.2 6,940.0 02:51 04:45 confirm TD, DS pillow block overheating,slow RIH speed to troubleshoot. 11/18/2016 11/18/2016 0.20 PROD1 DRILL DLOG P Tie in to K1 for minus 1.5 ft correction. 6,940.0 6,978.0 04:45 04:57 Pump 10x10 sweep 11/18/2016 11/18/2016 0.72 PROD1 DRILL TRIP P Continue RIH to EOB 6,978.0 7,896.0 04:57 05:40 11/18/2016 11/18/2016 0.92 PROD1 DRILL WPRT P At EOB.chase sweep to window and 7,896.0 7,086.0 05:40 06:35 make several jogs in 5" Page 16/37 Report Printed: 12/29/2016 0 0 Operations Summary (with Timelog Depths) 1B-18 ConocoPh'ithps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/18/2016 11/18/2016 1.33 PROD1 DRILL TRIP P RBIH to confirm TD 7,086.0 10,200.0 06:35 07:55 At 9,009'we tagged up, PUH reduce pump rate to.5 and went through area without a weight bobble no other issues seen to TD depth. PUWs were are all in normal range 26k until we got to 10,180' and then we had a 12k overpull looks like TD is at 10,200.0 11/18/2016 11/18/2016 0.35 PROD1 DRILL TRIP P On bottom and just started pumping 10,200.0 10,130.0 07:55 08:16 the liner running pill and waiting for pill to reach bit 11/18/2016 11/18/2016 2.97 PROD1 DRILL TRIP P POOH laying in beaded liner pill to 10,130.0 92.0 08:16 11:14 surface and completion fluid(11.8 ppg). 50 fpm and PUW=25K Paint flags at 8,372 ft and at 5,572 ft. 11/18/2016 11/18/2016 0.64 PROD1 DRILL OWFF P At surface. Perform Flow Check. 92.0 92.0 11:14 11:52 Hold PJSM for laying down BHA#18. Passing Flow Check 11/18/2016 11/18/2016 0.85 PROD1 DRILL PULD P L/D BHA#18 92.0 0.0 11:52 12:43 11/18/2016 11/18/2016 1.45 COMPZ1 'CASING EQRP P Swap out bails after PJSM. 0.0 0.0 12:43 14:10 11/18/2016 11/18/2016 2.60 COMPZ1 CASING PUTB P Start making up 55 joints 2 3/8" 0.0 1,694.0 14:10 16:46 Slotted Liner Note:Well Flowing BOP Drill performed. 11/18/2016 11/18/2016 1.45 COMPZ1 CASING PULD P MU AL1 liner assembly to BHA#19, 1,694.0 1,738.2 16:46 18:13 MU to CoilTrak,surface test 11/18/2016 11/18/2016 2.00 COMPZ1 CASING RUNL P RIH with BHA#19,Tie in at flag for 1,738.2 8,519.0 18:13 20:13 minus 7 ft correction,PUW 28k,RBIH, clean thru window and build section. 11/18/2016 11/19/2016 3.77 COMPZ1 CASING RUNL P Start stacking,begin working liner 8,519.0 10,092.0 20:13 00:00 assembly down,breakover 35k,broke free from 9,450 ft to 10,020 ft,work liner hard,confer with town. 11/19/2016 11/19/2016 0.25 COMPZ1 CASING RUNL P Continue working liner,unable to get 10,092.0 8,398.0 00:00 00:15 deeper than 10,092 ft,confer with town,PUW 38k,WOB-4.8k.Release off liner assembly at 1.2 bpm,PUW 32k,WOB-0.5k.reset counters.TOL 8,398 ft. 11/19/2016 11/19/2016 1.95 COMPZ1 CASING TRIP P POOH pumping across the top. 8,398.0 44.2 00:15 02:12 11/19/2016 11/19/2016 0.55 COMPZ1 CASING OWFF P On surface,flow check,good. PJSM- 44.2 44.2 02:12 02:45 LD BHA over dead well. 11/19/2016 11/19/2016 0.75 COMPZ1 CASING PULD P LD BHA#19. 44.2 0.0 02:45 03:30 11/19/2016 11/19/2016 0.50 COMPZ1 CASING BOPE P PJSM-Function test BOPE. 0.0 0.0 03:30 04:00 11/19/2016 11/19/2016 1.00 COMPZ1 CASING PULD P PJSM-MU OH Anchored billet to BHA 0.0 73.0 04:00 05:00 #20,MU to CoilTrak,surface test, DPS malfuntioning,unstab to change out CoilTrak tools. Page 17/37 Report Printed: 12/29/2016 ,:i. 0 0 Operations Summary (with Timelog Depths) ...4 , s • ._ . - , , 1B-18 ConocoPtsiiii ps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (MKS) End Depth(ftKB) 11/19/2016 11/19/2016 0.93 COMPZ1 CASING PULD T Swap CoilTrak tools. 73.0 73.0 05:00 05:55 11/19/2016 11/19/2016 2.50 COMPZ1 CASING RUNL P RIH with BHA#20,EDC open. 73.0 6,956.0 05:55 08:25 11/19/2016 11/19/2016 0.29 COMPZ1 CASING DLOG P Log for K1 Marker and make 6,956.0 6,982.0 08:25 08:43 correction of minus 1.5 ft 11/19/2016 11/19/2016 0.16 COMPZ1 CASING RUNL P Continue RIH with anchored billet 6,982.0 7,374.0 08:43 08:52 11/19/2016 11/19/2016 0.15 COMPZ1 CASING RUNL P Stop here and close EDC and perform 7,374.0 7,374.0 08:52 09:01 a weight check WT CK=26k 11/19/2016 11/19/2016 0.50 COMPZ1 CASING RUNL P Continue RIH with anchored billet 7,374.0 7,418.0 09:01 09:31 11/19/2016 11/19/2016 0.64 COMPZ1 CASING RUNL T Tag hard at 7,918 ft with 7,918.0 7,918.0 09:31 10:10 billet set down 3k and could not get string weight back.Tried PUH 50 ft and RBIH with no luck tried several other options to no avail.Last PUW was at 32k Confer with town engineer and decision made to POOH and put on a 1.5 degree motor and 2.80"Ridge Set Mill and clean out the hole and tag TOL to determine exact depth. 11/19/2016 11/19/2016 1.84 COMPZ1 CASING TRIP T POOH with anchored billet after 7,918.0 80.6 10:10 12:00 opening EDC and bringing pumps online at.7 bpm 11/19/2016 11/19/2016 0.68 COMPZ1 CASING OWFF T At surface.Perform flow check. 80.6 80.6 12:00 12:41 11/19/2016 11/19/2016 0.40 COMPZ1 CASING PULD T L/D BHA#20 BHA came back with 80.6 0.0 12:41 13:05 some sticky clay-like substance on it 11/19/2016 11/19/2016 0.50 COMPZ1 CASING PULD T P/U BHA#21 w/1.5 degree motor and 0.0 67.3 13:05 13:35 2.80"Ridge Set Mill 11/19/2016 11/19/2016 1.20 COMPZ1 CASING TRIP T RIH with EDC open pumping at.5 67.3 6,953.0 13:35 14:47 bpm 11/19/2016 11/19/2016 0.26 COMPZ1 CASING DLOG T Log for K1 Marker and make 6,953.0 6,972.0 14:47 15:03 correction of minus 1.5 ft 11/19/2016 11/19/2016 0.12 COMPZ1 CASING TRIP T Continue RIH 6,792.0 7,297.0 15:03 15:10 11/19/2016 11/19/2016 0.09 COMPZ1 CASING TRIP T Stop here and close EDC and perform 7,297.0 7,297.0 15:10 15:15 a weight check WT CK=28k 11/19/2016 11/19/2016 0.31 COMPZ1 CASING TRIP T Continue RIH 7,297.0 7,918.0 15:15 15:34 11/19/2016 11/19/2016 0.43 COMPZ1 CASING REAM T Have passed where we were hung up 7,918.0 8,399.0 15:34 16:00 with the billet earlier saw only the slightest weight bobble continuing creeping in hole at 20 fpm offline with pump and continue RIH to dry tag TOL at 8,399 ft 11/19/2016 11/19/2016 0.85 COMPZ1 CASING DISP T PUH slowly and bring pump online to 8,399.0 8,380.0 16:00 16:51 displace KWF with 8.8 Power-Pro before pumping sweeps and cleaning hole Page 18/37 Report Printed: 12/29/2016 0 • • Operations Summary (with Timelog Depths) 04 1B-18 oPhiilips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/19/2016 11/19/2016 2.65 COMPZ1 CASING REAM T Start PUH now that KWF has been 8,380.0 7,370.0 16:51 19:30 displace and begin hole cleaning operations,work area 7,955 ft to 7,840 ft,pump 5x5,RBIH,chase sweep to window,pump 2nd 5x5,jet/jog 5"- 7,370 ft to 7,070 ft,wait for sweeps to come over shaker. 11/19/2016 11/19/2016 1.60 COMPZ1 CASING TRIP T POOH,200 ft jog at surface.PJSM- 7,370.0 62.3 19:30 21:06 PUD BHA 11/19/2016 11/19/2016 1.85 COMPZ1 CASING PULD T On surafce,Attempt to PUD,unable to 62.3 62.3 21:06 22:57 bleed down,lower checks not holding, PJSM-scope change,close Annular and EDC,open bleed to pump,WHP drops 1,170 psi to 800 psi, troubleshoot,upper checks not holding also,confer with town,PD BHA#21 and RIH to kill well. 11/19/2016 11/19/2016 0.65 COMPZ1 CASING TRIP T RBIH with BHA#21, EDC open, 62.3 62.3 22:57 23:36 attempt flush upper floats 1.7 bpm while RIH,decided to stop at 350 ft, shut in well,bleed off to pumps,upper QC's holding,POOH 11/19/2016 11/20/2016 0.40 COMPZ1 CASING PULD T Bump up,space out,bleed back 62.3 62.3 23:36 00:00 pump,upper checks holding,PJSM- PUD BHA#21 under 1st contingency, close Annular,EDC closed. Note:BHI 3.5 hrs down time. 11/20/2016 11/20/2016 3.35 COMPZ1 CASING PULD T PUD BHA#21,close Annular,EDC 62.3 0.0 00:00 03:21 closed.LD mill and motor,LD upper half,check connection torques,open EDC,load PDL and MU anchored billet. 11/20/2016 11/20/2016 1.50 COMPZ1 CASING PULD T PJSM-PD OH Anchored billet BHA 0.0 72.9 03:21 04:51 #22,replace UQC floats,MU to CoilTrak,surface test. 11/20/2016 11/20/2016 1.66 COMPZ1 CASING TRIP T RIH with OH Anchored Billet(Shears 72.9 6,954.0 04:51 06:30 screws checked,pinned heavy, 16,960#,23-28k shear) 11/20/2016 11/20/2016 0.20 COMPZ1 CASING DLOG T Log for K1 Marker and make 6,954.0 6,980.0 06:30 06:42 correction of minus 1.0 ft. 11/20/2016 11/20/2016 0.15 COMPZ1 CASING TRIP T Continue RIH with Anchored Billet with 6,980.0 7,372.0 06:42 06:51 open EDC pumping at minimum rate 11/20/2016 11/20/2016 0.55 COMPZ1 CASING TRIP T Continue RIH with anchored 7,372.0 8,399.0 06:51 07:24 billet Note;Passed the problem area around 7,918 ft with only a slight weight bobble smooth sailing down to TOL 11/20/2016 11/20/2016 0.28 COMPZ1 CASING TRIP P Tag TOL with billet at 8,399 ft set 8,399.0 8,387.2 07:24 07:41 down 3k PUH to 24 k bring pump online and pump off of billet TOB at 8,387.25 ft, 150 degrees ROHS 11/20/2016 11/20/2016 1.80 COMPZ1 CASING TRIP P POOH pumping at 1.2 bpm 8,387.2 67.8 07:41 09:29 11/20/2016 11/20/2016 0.80 COMPZ1 CASING PULD P At surface.Pressure Undeploy BHA 67.8 67.8 09:29 10:17 #22 after PJSM. Page 19/37 Report Printed: 12/29/2016 0 0Operations Summary (with Timelog Depths) 1B-18 illi Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (fiKB) End Depth(ftKB) 11/20/2016 11/20/2016 0.40 COMPZ1 CASING PULD P Lay down BHA#22 67.8 0.0 10:17 10:41 11/20/2016 11/20/2016 0.55 PROD2 STK PULD P P/U BHA#23 w/AKO.8° motor and 0.0 72.1 10:41 11:14 HCC 2.7X3.0"bit 11/20/2016 11/20/2016 0.85 PROD2 STK PULD P Pressure Deploy BHA#23 72.1 72.1 11:14 12:05 11/20/2016 11/20/2016 1.10 PROD2 RIGMNT SVRG P Service Rig Service Choke B, 72.1 72.1 12:05 13:11 Rotate Top Drive,Change out Locking Pin hose on ram. 11/20/2016 11/20/2016 1.33 PROD2 STK TRIP P RIH with open EDC pumping at.5 72.1 6,954.0 13:11 14:31 bpm 11/20/2016 11/20/2016 0.18 PROD2 STK DLOG P Log for K1 Marker and make 6,954.0 6,997.0 14:31 14:42 correction of minus 1.5 ft 11/20/2016 11/20/2016 0.14 PROD2 STK TRIP P Continue RIH 6,997.0 7,381.0 14:42 14:50 11/20/2016 11/20/2016 0.15 PROD2 STK TRIP P Stop here and close EDC and perform 7,381.0 7,381.0 14:50 14:59 a weight check..WT CK=26k 11/20/2016 11/20/2016 0.30 PROD2 STK TRIP P Continue RIH to billet 7,381.0 8,387.6 14:59 15:17 11/20/2016 11/20/2016 1.50 PROD2 STK KOST P Tag TOB at 8,387.64 ft PUH and 8,387.6 8,387.0 15:17 16:47 start creeping back in hole 1.5 bpm CP=3,797 WHP=510 BHP =4,272 CTW=13.87 K WOB=.34 K 11/20/2016 11/21/2016 7.21 PROD2 STK KOST P OBD 1.59 bpm Circ Press= 8,387.0 8,387.0 16:47 00:00 4,084 WHP=510 BHP=4,252 CTW=24K WOB=.54 K Having some weight transfer issues have pumped a Hi-Lo Vis pill and a beaded pill to help BHA wipers,beads,varying speeds,rates and trenching,engauged at 8,386.6 ft, aluminum across shaker. 11/21/2016 11/21/2016 3.15 PROD2 STK KOST P Kick off billet using beads,frequent 8,387.0 8,395.0 00:00 03:09 stalls due to stick slipping after starting, 1.53 bpm at 3,800 psi FS, BHP 4,250 psi,WHP 495,IA 134,OA 0 11/21/2016 11/21/2016 0.50 PROD2 DRILL DRLG P OBD 1.55 bpm at 3,800 psi FS,BHP 8,395.0 8,430.0 03:09 03:39 4,257 psi,CWT 13.8k,WOB0.8k, ROP 53 11/21/2016 11/21/2016 0.25 PROD2 DRILL WPRT P Wiper up hole above billet to 8,300 ft, 8,430.0 8,430.0 03:39 03:54 PUW 26k, RBIH,dry drift billet area clean. 11/21/2016 11/21/2016 6.80 PROD2 DRILL DRLG P BOBD 1.61 bpm at 3,998 psi FS, BHP 8,430.0 8,750.0 03:54 10:42 4,268 psi,CWT 11.8k,WOB 1.0k, ROP 40 to 80 fph Page 20/37 Report Printed: 12/29/2016 ,. Operations Summary (with Timelog Depths) .,.:, • •..,0L 1B-18 Phillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth MKS) 11/21/2016 11/21/2016 1.45 PROD2 DRILL WPRT P Once 5 x 5 sweep is out of bit,PUH 8,750.0 8,750.0 10:42 12:09 for a wiper trip to the 5" make several jogs in 5" Town is also looking at the DLS data to determine if we need to POOH and change to a lesser degree motor doglegs are coming in at 16 degrees instead of 12 degrees Jeff calls back and town has decided to keep what we have on for now DLS is trending downward 11/21/2016 11/21/2016 7.53 PROD2 DRILL DRLG P BOBD 1.63 bpm at 4,359 psi FS,BHP 8,750.0 9,008.0 12:09 19:40 4,323 psi,CWT 10.8k,WOB 1.0k, ROP 20 to 40 fph Note:The two dog legs right before 1730hrs were both 16.4 and 18 degrees 11/21/2016 11/21/2016 2.00 PROD2 DRILL WPRT P At 9,008 ft and having weight transfer 9,008.0 9,008.0 19:40 21:40 issues current mud system has around 1,400 ft and.8 DS will try and do a 1,000 ft wiper trip to see if that helps before doing a mud swap wiper trip did not help start pumping a beaded pill 11/21/2016 11/22/2016 2.32 PROD2 DRILL DRLG P BOBD 1.53 bpm at 4,357 psi FS,BHP 9,008.0 9,101.0 21:40 00:00 4,337 psi,CWT 6.3k,WOB 1.4k,ROP 20 to 50 fph Note:We got weight transfer back before the beaded pill exited the nozzle still on System#4 11/22/2016 11/22/2016 8.50 PROD2 DRILL DRLG P OBD 1.5 bpm at 3,981 psi FS,BHP 9,101.0 9,410.0 00:00 08:30 4,292 psi,CWT-0.7k,WOB 2.0k, ROP 30,WHP 478,IA 440,OA 0 Note:Mud swap with new mud out bit at 9,242 ft. 11/22/2016 11/22/2016 2.00 PROD2 DRILL WPRT P Wiper trip to window, PUW 25k,hole 9,410.0 7,070.0 08:30 10:30 loading up,200 ft jog at EOB,Pulling heavy thru build from 7,820 ft,clean thru window,Jet/Jog 5",wait for shaker to clean up,RBIH 11/22/2016 11/22/2016 0.15 PROD2 DRILL DLOG P Log RA fora plus 4.0 ft correction. 7,070.0 7,429.0 10:30 10:39 11/22/2016 11/22/2016 0.75 PROD2 DRILL WPRT P Wiper back in hole,clean thru build 7,429.0 9,410.0 10:39 11:24 and hole appears clean. 11/22/2016 11/22/2016 1.30 PROD2 DRILL DRLG P BOBD 1.52 bpm at 4,055 psi FS,BHP 9,410.0 9,432.0 11:24 12:42 4,348 psi,CWT 6k,WOB 1.1k,ROP 80.Lost all returns at 9,424 ft,PUW 28k,RBIH,restart 1.52 bpm at 4,055 FS,BHP 4,338 psi,CWT 6k,WOB 1.1k,ROP 99,healing starting at 9,445 ft. Page 21/37 Report Printed: 12/29/2016 • • 0:, 0 `' Operations Summary (with Timelog Depths) 1B-18 Conoccehi lips Micsk:.a Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/22/2016 11/22/2016 5.50 PROD2 DRILL DRLG P OBD 1.52 bpm at 4,055 psi FS, BHP 9,432.0 9,561.0 12:42 18:12 4,338 psi,CWT-8k,WOB 1.4k, ROP 3,hit Anchorite,slow drilling 11/22/2016 11/22/2016 1.30 PROD2 DRILL DRLG P OBD 1.52 bpm at 4055 psi FS, BHP 9,561.0 9,629.0 18:12 19:30 4331,WHP 375, IA 367,OA 0 11/22/2016 11/22/2016 0.25 PROD2 DRILL WPRT P 200'wiper up hole,PUW 9,629.0 9,429.0 19:30 19:45 11/22/2016 11/22/2016 0.25 PROD2 DRILL WPRT P Wiper back in hole,RIW 5 k 9,429.0 9,629.0 19:45 20:00 11/22/2016 11/23/2016 4.00 PROD2 DRILL DRLG P BOBD 1.52 bpm at 4055 psi FS,BHP 9,629.0 9,779.0 20:00 00:00 4350,WHP 373,IA 368,OA 6 11/23/2016 11/23/2016 0.75 PROD2 DRILL DRLG P OBD 1.52 bpm at 4055 psi FS, BHP 9,779.0 9,810.0 00:00 00:45 4431,WHP 375, IA 368,OA 6 11/23/2016 11/23/2016 0.35 PROD2 DRILL WPRT P Wiper up hole 1000', PUW 28 k 9,810.0 8,800.0 00:45 01:06 11/23/2016 11/23/2016 0.50 PROD2 DRILL WPRT P Wiper back in hole,RIW 9 k 8,800.0 9,810.0 01:06 01:36 11/23/2016 11/23/2016 7.95 PROD2 DRILL DRLG P BOBD 1.52 bpm at 3860 psi FS,BHP 9,810.0 9,989.0 01:36 09:33 4326,WHP 359, IA 375,OA 0 11/23/2016 11/23/2016 2.00 PROD2 DRILL WPRT P Wiper trip to window, PUW 27k,hole 9,989.0 7,070.0 09:33 11:33 loading up,200 ft jog at FOB,Pulling heavy 31k thru build from 7,820 ft, clean thru window,Jet/Jog 5",wait for shaker to clean up,RBIH 11/23/2016 11/23/2016 0.25 PROD2 DRILL DLOG P Log RA for a plus 4.5 ft correction. 7,070.0 7,430.0 11:33 11:48 11/23/2016 11/23/2016 0.95 PROD2 DRILL WPRT P Wiper back in hole,clean thru build, 7,430.0 9,989.0 11:48 12:45 past billet and hole appears clean RIW. 11/23/2016 11/23/2016 5.25 PROD2 DRILL DRLG P BOBD 1.55 bpm at 4,100 psi FS,BHP 9,989.0 10,106.0 12:45 18:00 4,366 psi,CWT-3.7k,WOB, 1.2k, WHP 373, IA 400,OA 0,BHA wiper at 9,949' 11/23/2016 11/24/2016 6.00 PROD2 DRILL DRLG P Continue drilling ahead 1.52 bpm at 10,106.0 10,246.0 18:00 00:00 4,100 FS,BHP 4384,WHP 344, IA 461,OA 0, BHA wiper at 10,120', 10,165', 10,192',pumping beaded pills 11/24/2016 11/24/2016 3.25 PROD2 DRILL DRLG P Continue drilling ahead on bottom, 1.4 10,246.0 10,299.0 00:00 03:15 bpm at 4200 psi,BHP 4371,WHP 366,IA 466,OA 0 11/24/2016 11/24/2016 0.50 PROD2 DRILL WPRT P 1000'Wiper up hole PUW 25 k 10,299.0 9,300.0 03:15 03:45 11/24/2016 11/24/2016 0.35 PROD2 DRILL WPRT P Wiper back in hole. RIW 2 k 9,300.0 10,299.0 03:45 04:06 11/24/2016 11/24/2016 12.25 PROD2 DRILL DRLG P BOBD 1.4 bpm at 3921 psi FS,BHP 10,299.0 10,688.0 04:06 16:21 4374,WHP 370, IA 436,OA 0,lots of pick ups and beads,PUW's 25k to 27k and clean.pump 10x10 11/24/2016 11/24/2016 2.50 PROD2 DRILL WPRT P Wiper trip to window,PUW 25k,pull 10,688.0 7,410.0 16:21 18:51 up thru window jog the 5 inch up to 7,410' 11/24/2016 11/24/2016 0.25 PROD2 DRILL DLOG P RIH,log the RA marker correction of 7,410.0 7,430.0 18:51 19:06 plus 5.5' 11/24/2016 11/24/2016 1.25 PROD2 DRILL WPRT P Wiper back in hole RIW 1.5 k 7,430.0 10,688.0 19:06 20:21 11/24/2016 11/25/2016 3.65 PROD2 DRILL DRLG P BOBD 1.35 bpm at 4060 psi FS,BHP 10,688.0 10,770.0 20:21 00:00 4470,WHP 408, IA 372,OA 0 Page 22/37 Report Printed: 12/29/2016 • • ,i, ..' Operations Summary (with Timelog Depths) p 1B-18 C€nocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hi) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(WE) 11/25/2016 11/25/2016 9.95 PROD2 DRILL DRLG P OBD 1.35 bpm at 4,060 psi FS,BHP 10,770.0 10,900.0 00:00 09:57 4395,WHP 363, IA 367,OA 0,Lo-vis sweeps folowed by lots of beads and numerous pick ups,PUW's 28k to 31k, pumped last of beaded pill,MU Hi-vis sweep 11/25/2016 11/25/2016 0.75 PROD2 DRILL CIRC P TD called,reciprocate pipe,PUW 28k 10,900.0 10,900.0 09:57 10:42 while pumping last of beaded pill,build Hi/Lo vis sweeps,pump 10x10 Lo/Hi sweep. 11/25/2016 11/25/2016 2.10 PROD2 DRILL WPRT P Chase sweeps to window,PUW 28k, 10,900.0 7,070.0 10:42 12:48 Jog at EOB,slow thru window 6 fpm at 0.5 bpm. 11/25/2016 11/25/2016 1.15 PROD2 DRILL WPRT P Jet/jog 5"from 7,370 ft to 7,070 ft 2 7,070.0 7,370.0 12:48 13:57 times,wait for returns to clean up over shaker,pump 10x10. 11/25/2016 11/25/2016 0.55 PROD2 DRILL WPRT P RBIH to 8,250 ft. 7,370.0 8,250.0 13:57 14:30 11/25/2016 11/25/2016 2.40 PROD2 DRILL WPRT P Chase 10x10 sweeps to 5"and Jet/jog 8,250.0 72.2 14:30 16:54 5"fromm 7,370 ft to 7,070 ft,wait for returns to clean up,continue wiper to swab,250 ft jog at surface. 11/25/2016 11/25/2016 1.60 PROD2 DRILL TRIP P Bump up,reset counters, RBIH to 72.2 6,940.0 16:54 18:30 confirm TD 11/25/2016 11/25/2016 0.25 PROD2 DRILL DLOG P Tie in to K1 for minus 1.0 ft correction. 6,940.0 6,980.0 18:30 18:45 Pump 10x10 sweep,jogged the build section,jetted the 5 inch, 11/25/2016 11/25/2016 2.50 PROD2 DRILL TRIP P Continue RIH,bobble at 10299',TF 6,980.0 10,900.0 18:45 21:15 stops rotated,PUH,RBIH clean with drilled TF,confirmed TD 10,900'. 11/25/2016 11/26/2016 2.75 PROD2 DRILL DISP P POOH laying in12.0 ppg liner running 10,900.0 4,167.0 21:15 00:00 pill with beads,painting EOP flags at 9,800'and 6,200' 11/26/2016 11/26/2016 1.00 PROD2 DRILL TRIP P Continue POOH 4,167.0 72.1 00:00 01:00 11/26/2016 11/26/2016 0.75 PROD2 DRILL OWFF P PJSM,check well for flow 72.1 72.1 01:00 01:45 11/26/2016 11/26/2016 1.00 PROD2 DRILL PULD P LD drilling BHA#23 72.1 0.0 01:45 02:45 11/26/2016 11/26/2016 0.30 COMPZ2 CASING PUTB P Prep rig floor to run liner. 0.0 0.0 02:45 03:03 11/26/2016 11/26/2016 0.25 COMPZ2 CASING SFTY P PJSM,to MU lower AL3-01 liner 0.0 0.0 03:03 03:18 section *"**Note:Bit grade 8-6-LM-NX-I-BT- TD,pictures are on the s:drive 11/26/2016 11/26/2016 2.95 COMPZ2 CASING PUTB P MU Ported bullnose,32 jts of slotted 0.0 1,044.7 03:18 06:15 liner and shorty to BHA#24,change out checks,surface test. 11/26/2016 11/26/2016 2.00 COMPZ2 CASING RUNL P RIH with AL3-01 lower liner assembly, 1,044.7 8,450.0 06:15 08:15 minus 6.0 ft at flag,continue RIH. Page 23/37 Report Printed: 12/29/2016 0 0 Operations Summary (with Timelog Depths) 0 ® 1B-18 ConocoPhilgps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(5KB) 11/26/2016 11/26/2016 3.00 COMPZ2 CASING RUNL T Stacking 8,450 ft to 8,500 ft,PUW 8,450.0 9,910.0 08:15 11:15 30k,continue RIH,stacking at 9,800 ft,attempt to work down,loosing ground to 9,669 ft,pump.4 bpm,work to 9,775 ft, PU 225 ft,RIH 55 fpm to 9,910 ft, PUW 35k,loosing ground getting back to 9,900 ft, PUH,RBIH to 9,906 ft,unable to work deeper, loosing ground to 9,880 ft,confer with town. 11/26/2016 11/26/2016 2.50 COMPZ2 CASING TRIP T POOH for BOPE test and plan 9,910.0 1,044.7 11:15 13:45 forward, PUW 36k. 11/26/2016 11/26/2016 0.50 COMPZ2 CASING OWFF T On surface,monitor well for flow, 1,044.7 1,044.7 13:45 14:15 PJSM-LD BHA over dead well. 11/26/2016 11/26/2016 0.75 COMPZ2 CASING PULD T LD BHA#24,prep floors. 1,044.7 1,000.2 14:15 15:00 11/26/2016 11/26/2016 3.00 COMPZ2 CASING PULL T PJSM-LD shorty,32 jts slotted and 1,000.2 0.0 15:00 18:00 bullnose. 11/26/2016 11/26/2016 2.00 COMPZ2 CASING CTOP T Flush surface lines and displace coil to 0.0 0.0 18:00 20:00 fresh water,grease choke manifold 11/26/2016 11/27/2016 4.00 COMPZ2 WHDBOP BOPE P Start BOP testing,test witness waived 0.0 0.0 20:00 00:00 per state tester Lou Grimadli,3,500 psi high/250 psi low/2,500 annular preventor.Stab INJH test inner reel valve,stripper 11/27/2016 11/27/2016 5.00 COMPZ2 WHDBOP BOPE T Continue BOP testing,test witness 0.0 0.0 00:00 05:00 waived per state tester Lou Grimaldi, 3,500 psi high/250 psi low/2,500 annular preventor flowing BOP check list. 11/27/2016 11/27/2016 3.00 COMPZ2 CASING CTOP T RD test equipment,flush surface lines 0.0 0.0 05:00 08:00 and displace coil to 12.0 ppg completion fluid,grease choke manifold and stack 11/27/2016 11/27/2016 1.35 COMPZ2 CASING PULD T PJSM,MU Cleanout BHA#25 with a 0.0 62.4 08:00 09:21 0.8°ako motor and D331 GEB,2.79" no/go,MU to CoilTrak,surface test. 11/27/2016 11/27/2016 1.40 COMPZ2 CASING TRIP T RIH with clean out BHA#25 62.4 6,940.0 09:21 10:45 11/27/2016 11/27/2016 0.20 COMPZ2 CASING DLOG T Tie in to K1 for minus 1.5 ft correction. 6,940.0 6,973.0 10:45 10:57 11/27/2016 11/27/2016 1.65 COMPZ2 CASING TRIP T Continue RIH,close EDC,PUW 6,973.0 10,900.0 10:57 12:36 above window 27k,clean thru build, some drag just past billet,clean past 9,910 ft,(15k CWT)confirm TD again at 10,900 ft(10k CWT) 11/27/2016 11/27/2016 0.25 COMPZ2 CASING SFTY T Confirm TD again at 10,900 ft(10k 10,900.0 10,900.0 12:36 12:51 CWT)confer with town,change of scope,will not clean out,pump new bedaded completion fluid to surface. PJSM-change of scope. 11/27/2016 11/27/2016 5.50 COMPZ2 CASING CIRC T Reciprocate pipe,PUW 29k,while 10,900.0 10,900.0 12:51 18:21 making up 100 bbl of 12.0 ppg beaded liner pill,2ppb beads,3%Safe Lube, and pumping to mill,pulled 34.5k at 9,905 11/27/2016 11/27/2016 3.00 COMPZ2 CASING TRIP T Discuss plan forward,POOH from 10,900.0 62.4 18:21 21:21 10,570'displacing wellbore to beads, beads to surface,continue POOH pumping pipe displacement. Page 24/37 Report Printed: 12/29/2016 • • :.,,...,. 0 ., , Operations Summary (with Timelog Depths) ,,,...a r„ 1B-18 ConocoPhinips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(EKE) 11/27/2016 11/27/2016 0.50 COMPZ2 CASING OWFF T Tag up at surface,PJSM,check well 62.4 62.4 21:21 21:51 for flow 11/27/2016 11/27/2016 0.65 COMPZ2 CASING PULD T LD Cleanout BHA 62.4 0.0 21:51 22:30 11/27/2016 11/27/2016 0.50 COMPZ2 CASING SFTY T Tools OOH,Prep to MU liner 0.0 0.0 22:30 23:00 assembly 11/27/2016 11/27/2016 0.75 COMPZ2 CASING PUTB T MU 16 joints of slotted liner 0.0 505.6 23:00 23:45 11/27/2016 11/28/2016 0.25 COMPZ2 CASING PULD T PU/MU BHI Coiltrak tools,w/agitator 505.6 505.6 23:45 00:00 11/28/2016 11/28/2016 1.00 COMPZ2 CASING PULD T Continue MU Coiltrak tools,surface 505.6 557.1 00:00 01:00 test 11/28/2016 11/28/2016 1.50 COMPZ2 CASING RUNL T RIH,with AL3-01 liner running BHA# 557.1 7,364.0 01:00 02:30 26 with agitator 11/28/2016 11/28/2016 0.25 COMPZ2 CASING RUNL T Correct to the 6,700'EOP flag, 7,364.0 7,450.0 02:30 02:45 continue IH 11/28/2016 11/28/2016 0.25 COMPZ2 CASING DLOG T Log the K1 correction of plus 5.0' 7,450.0 7,450.0 02:45 03:00 11/28/2016 11/28/2016 0.55 COMPZ2 CASING RUNL T Continue RIH to bottom,no pumps,35 7,450.0 9,110.0 03:00 03:33 fpm,BHP 4 450 psi,annular increasing 11/28/2016 11/28/2016 1.30 COMPZ2 CASING RUNL P Continue RIH to bottom(off trouble 9,110.0 10,900.0 03:33 04:51 time)on depth at 10,900 ft,release off liner at 1.1 bpm at 5,000 psi BHA, PUW 25k,liner appears to be off, reset depths. 11/28/2016 11/28/2016 3.65 COMPZ2 CASING TRIP P POOH,paint flags at 8,000 ft and 10,393.0 50.3 04:51 08:30 5,000 ft 11/28/2016 11/28/2016 0.50 COMPZ2 CASING OWFF P On surface,monitor well for flow. 50.3 50.3 08:30 09:00 PJSM-LD BHA over dead well 11/28/2016 11/28/2016 0.75 COMPZ2 CASING PULD P LD BHA#26,remove agitator from 50.3 0.0 09:00 09:45 BHA,lower liner in hole. 11/28/2016 11/28/2016 0.50 COMPZ2 CASING RURD P Prep floors for liner run. 0.0 0.0 09:45 10:15 11/28/2016 11/28/2016 1.40 COMPZ2 CASING PUTB P PJSM-MU ported bullnose,38 jts 0.0 1,191.9 10:15 11:39 slotted,Shorty. 11/28/2016 11/28/2016 0.85 COMPZ2 CASING PULD P PJSM-MU lower liner assembly to 1,191.9 1,236.1 11:39 12:30 CoilTrak tools,surface test. 11/28/2016 11/28/2016 3.10 COMPZ2 CASING RUNL P RIH with 1,192 ft AL3-01 lower middle 1,236.1 8,130.0 12:30 15:36 liner BHA#27,correct to flag minus 3.5 ft,continue RIH, PUW 25k at 7,000 ft.continue RIH 11/28/2016 11/28/2016 0.15 COMPZ2 CASING DLOG P Log K1 for plus 1.5 ft, 8,130.0 8,160.0 15:36 15:45 11/28/2016 11/28/2016 0.95 COMPZ2 CASING RUNL P Continue RIH,35 fpm at-350 psi over 8,160.0 10,145.0 15:45 16:42 BHP,pumps off. 11/28/2016 11/28/2016 0.65 COMPZ2 CASING RUNL P Stacking at 10,145 ft,PUW 30k,work 10,145.0 10,392.0 16:42 17:21 liner to 10,392 ft,PUW 30k,release off liner at 1.1 bpm at 4,711 psi, BHP 4,882 psi,775 psi Diff. PUW 22k. reset counters. 11/28/2016 11/28/2016 3.15 COMPZ2 CASING TRIP P POOH pumping beaded completion 9,200.0 44.2 17:21 20:30 fluid paint EOP flags at 8,000 ft and 6,200 ft. 11/28/2016 11/28/2016 0.50 COMPZ2 CASING OWFF P On surface,monitor well for flow. 44.2 44.2 20:30 21:00 PJSM-LD BHA over dead well 11/28/2016 11/28/2016 0.50 COMPZ2 CASING PULD P LD BHA#27 44.2 0.0 21:00 21:30 Page 25/37 Report Printed: 12/29/2016 • • 0 Operations Summary (with Timelog Depths) 1B-18 C hinhps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Cur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/28/2016 11/28/2016 0.25 COMPZ2 CASING RURD P Prep floors for liner run 0.0 0.0' 21:30 21:45 11/28/2016 11/28/2016 1.50 COMPZ2 CASING PUTB P PJSM-MU ported bullnose,35 jts 0.0 1,090.3 21:45 23:15 slotted, 10 ft solid pup jt and Shorty. 11/28/2016 11/29/2016 0.75 COMPZ2 CASING PULD P PJSM-MU number 3 liner assembly to 1,090.3 1,134.5 23:15 00:00 BHA#28,MU to CoilTrak tools 11/29/2016 11/29/2016 0.25 COMPZ2 CASING PULD P continue to MU number 3 liner 1,134.5 1,134.5 00:00 00:15 assembly to CoilTrak tools,surface test. 11/29/2016 11/29/2016 2.00 COMPZ2 CASING RUNL P RIH with 1,092 ft AL3-01 middle liner 1,134.5 7,334.5 00:15 02:15 BHA#27 11/29/2016 11/29/2016 0.25 COMPZ2 CASING RUNL P Correct to the EOP flag,continue IH 7,334.5 8,762.0 02:15 02:30 11/29/2016 11/29/2016 1.00 COMPZ2 CASING RUNL P Set down minus 10 k CTSW,minus 8,762.0 9,201.0 02:30 03:30 1.9 k DHWOB,PUW 28 k, RBIH,at 45 fpm, 11/29/2016 11/29/2016 2.00 COMPZ2 CASING TRIP P Remove liner length from BHA,POOH 9,201.0 55.1 03:30 05:30 11/29/2016 11/29/2016 0.50 COMPZ2 CASING PULD P Check well for flow,PJSM for laying 55.1 55.1 05:30 06:00 down settting BHA 11/29/2016 11/29/2016 1.00 COMPZ2 CASING PULD P LD BHA#28,liner setting tools 55.1 0.0 06:00 07:00 11/29/2016 11/29/2016 0.75 COMPZ2 CASING PULD P PU/MU OH anchored billet 0.0 0.0 07:00 07:45 11/29/2016 11/29/2016 0.50 COMPZ2 CASING PULD P Discuss with town team concerns of 0.0 0.0 07:45 08:15 current fluid in hole,w/running an OH Anchored Billet. 11/29/2016 11/29/2016 1.25 COMPZ2 CASING PULD P PJSM,LD billet,MU cleanout BHA 0.0 62.4 08:15 09:30 with a D331. 11/29/2016 11/29/2016 3.00 COMPZ2 CASING TRIP P Tag up,reset counters,surface test 62.4 6,947.0 09:30 12:30 BHI Coiltrak tools.RIH,slowly keeping annular below 350 psi over pressure schedule,switching to 8.8 ppg drilling fluid,at.15 bpm,BHP 4,600 psi 11/29/2016 11/29/2016 0.25 COMPZ2 CASING DLOG P log the K1 correction of minus 2.0' 6,947.0 6,970.0 12:30 12:45 11/29/2016 11/29/2016 1.25 COMPZ2 CASING TRIP P Continue RIH 6,970.0 8,090.0 12:45 14:00 11/29/2016 11/29/2016 5.50 COMPZ2 CASING DISP P Jog from 8,090'to 7,150',increasing 8,090.0 8,090.0 14:00 19:30 pump rate to 0.4 bpm,BHP 4,590 psi displacing well to 8.8 ppg used flopro. 11/29/2016 11/29/2016 2.00 COMPZ2 CASING TRIP P POOH,jogging before build and inside 8,090.0 500.0 19:30 21:30 5".Chase sweep out of the hole. 11/29/2016 11/29/2016 0.50 COMPZ2 CASING TRIP P Open EDC,continue POOH.Tag up 500.0 56.0 21:30 22:00 and space out. 11/29/2016 11/29/2016 1.25 COMPZ2 CASING PULD P PUD BHA#29. 56.0 0.0 22:00 23:15 11/29/2016 11/30/2016 0.75 COMPZ2 CASING PULD P PU and PD BHA#30,anchored billet 0.0 0.0 23:15 00:00 assembly. 11/30/2016 11/30/2016 1.00 COMPZ2 CASING PULD P Continue to PD BHA#30.Anchored 0.0 72.0 00:00 01:00 billet assembly. 11/30/2016 11/30/2016 1.75 COMPZ2 CASING TRIP P RIH with anchored billet.SOW= 72.0 6,950.0 01:00 02:45 15KIbs 11/30/2016 11/30/2016 0.25 COMPZ2 CASING DLOG P Log the K1 for a-2 ft correction. 6,950.0 6,982.0 02:45 03:00 Page 26/37 Report Printed: 12/29/2016 • s `= Operations Summary (with Timelog Depths) 0 1B-18 ConocoI nilips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/30/2016 11/30/2016 0.75 COMPZ2 CASING TRIP P Close EDC at the window.Continue 6,982.0 8,105.0 03:00 03:45 running in the hole with BHA#30.Tag up at 8105 ft.PU and repeat tag at 8105 ft. Bring up pump and set billet at 4700 psi,anchor oriented low side.Top of billet at 8,094 ft. 11/30/2016 11/30/2016 2.25 COMPZ2 CASING TRIP P POOH with BHA#30. 8,105.0 61.0 03:45 06:00 11/30/2016 11/30/2016 2.00 COMPZ2 CASING PULD P PJSM,PUD, BHA#30 61.0 0.0 06:00 08:00 11/30/2016 11/30/2016 3.00 PROD3 DRILL SVRG P Install MM parts,simops repair 0.0 0.0 08:00 11:00 hydraulic seal in cellar. 11/30/2016 11/30/2016 1.50 PROD3 DRILL PULD P PJSM, PD kickoff/drilling BHA 0.0 72.1 11:00 12:30 11/30/2016 11/30/2016 1.50 PROD3 DRILL TRIP P RIH w/AL3 kickoff/drilling BHA#31, 72.1 6,947.0 12:30 14:00 0.8 ako motor and RB HYC bi-center bit 11/30/2016 11/30/2016 0.25 PROD3 DRILL DLOG P Log the K1 marker correction minus 6,947.0 6,957.0 14:00 14:15 1.5' 11/30/2016 11/30/2016 0.25 PROD3 DRILL TRIP P Continue RIH to bottom 6,957.0 8,094.0 14:15 14:30 11/30/2016 11/30/2016 5.50 PROD3 STK KOST P Dry tag TOB at 8093.8',PUW 28 k 8,094.0 8,115.0 14:30 20:00 Begin milling billet.Stacking CT weight.Pump beads to assist kicking off.Drill off billet to 8115ft PUH,clean dry drift through billet area. 11/30/2016 12/1/2016 4.00 PROD3 DRILL 'DRLG P Continue drilling ahead,pumping 1.5 8,115.0 8,320.0 20:00 00:00 BPM,at 3860 psi.BHP=4200 psi, WHP=498 psi.WOB 1.5-2 Klbs,ROP =20-70 FPH. 12/1/2016 12/1/2016 3.25 PROD3 DRILL DRLG P Continue drilling ahead,pumping 1.5 8,320.0 8,490.0 00:00 03:15 BPM,at 3900 psi.BHP=4200 psi, WHP=498 psi.WOB 1.5-2 Klbs,ROP =20-70 FPH. 12/1/2016 12/1/2016 0.25 PROD3 DRILL WPRT P PUH for planned wiper trip.PUW= 8,490.0 8,110.0 03:15 03:30 26KIbs. 12/1/2016 12/1/2016 0.25 PROD3 DRILL WPRT P RBIH.SOW=13.5 Klbs 8,110.0 8,490.0 03:30 03:45 12/1/2016 12/1/2016 5.00 PROD3 DRILL DRLG P BOBD, 1.4 bpm at 3,598 psi,BHP 8,490.0 8,805.0 03:45 08:45 4283,WHP 644 12/1/2016 12/1/2016 1.50 PROD3 DRILL WPRT P Wiper up hole,PUW 25 k,jog the 5 8,805.0 7,393.0 08:45 10:15 inch 12/1/2016 12/1/2016 0.25 PROD3 DRILL DLOG P RBIH,log the RA marker correction of 7,393.0 7,431.0 10:15 10:30 plus 3.0'. 12/1/2016 12/1/2016 0.75 PROD3 DRILL WPRT P Wiper back in hole,RIW 11 k 7,431.0 8,805.0 10:30 11:15 12/1/2016 12/1/2016 6.75 PROD3 DRILL DRLG P BOBD, 1.53 bpm at 3,712 psi,BHP 8,805.0 9,045.0 11:15 18:00 4,396,WHP 663,IA 200,OA 0 12/1/2016 12/2/2016 6.00 PROD3 DRILL DRLG P Continue drilling ahead pumping 1.55 9,045.0 9,164.0 18:00 00:00 BPM at 4250 psi.BHP 4310 psi. IA 252,OA 0. Beginning to have weight transfer issues.Prepare pill pit for beaded pills. Page 27/37 Report Printed: 12/29/2016 ' Operations Summary (with Timelog Depths) 0 1B-18 ConocoPhithps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/2/2016 12/2/2016 5.00 PROD3 DRILL DRLG P Continue drilling ahead pumping 1.55 9,164.0 9,245.0 00:00 05:00 BPM at 4150 psi. BHP 4430 psi. IA 265,OA 0. Beginning to have weight transfer issues.Begin pumping alternating 20bbI beaded pills,followed by 20bbI mud from the active. BHA wipers as required to maintain weight transfer. 12/2/2016 12/2/2016 1.25 PROD3 DRILL WPRT P Wiper up hole into the 5 inch.PUW 25 9,245.0 7,393.0 05:00 06:15 12/2/2016 12/2/2016 0.25 PROD3 DRILL WPRT P RIH,to log RA 7,393.0 7,404.0 06:15 06:30 12/2/2016 12/2/2016 0.25 PROD3 DRILL DLOG P Log the RA marker correction of plus 7,404.0 7,431.0 06:30 06:45 3.5' 12/2/2016 12/2/2016 0.75 PROD3 DRILL WPRT P Wiper back in hole,RIW 14 k 7,431.0 9,245.0 06:45 07:30 12/2/2016 12/2/2016 6.00 PROD3 DRILL DRLG P BOBD 1.4 bpm at 4,029 psi FS,BHP 9,245.0 9,322.0 07:30 13:30 4272,WHP 405,IA 289,OA 0, pumping beads,mix up 45 bbl of lubed pill(2%of each)no advantage seen,continue pumping beaded pills, 12/2/2016 12/2/2016 3.00 PROD3 DRILL DRLG P OBD 1.4 bpm at 4,025psi, BHP 4,284, 9,322.0 9,358.0 13:30 16:30 WHP 465,IA 357,OA 0 12/2/2016 12/2/2016 2.00 PROD3 DRILL DRLG P OBD with beaded pills,40/20 beads, 9,358.0 9,384.0 16:30 18:30 22 fph, 1 k-DHWOB,0 k-CTSW 1.4 bpm at 4,313 psi,BHP 385,WHP 414, IA 358,OA 0 12/2/2016 12/2/2016 4.25 PROD3 DRILL DRLG P Continue drilling pumping 40bbI 9,384.0 9,437.0 18:30 22:45 beaded pills followed by 20 bbls of mud from the active. CTW=-5KIbs,WOB=0.8-1.0KIbs BHP 4350 psi.Multiple BHA wipers required to maintain weight transfer. 12/2/2016 12/3/2016 1.25 PROD3 DRILL WPRT P PUH for early wiper trip.Troubleshoot 9,437.0 9,223.0 22:45 00:00 mud pump#2. 12/3/2016 12/3/2016 1.50 PROD3 DRILL WPRT P Continue wiper trip to the window. 9,223.0 7,220.0 00:00 01:30 Troubleshoot MP#1 and MP#2 while pulling to the window. 12/3/2016 12/3/2016 1.50 PROD3 DRILL WPRT P Jog the 5 inch,while troubleshooting 7,220.0 7,380.0 01:30 03:00 pump issues. 12/3/2016 12/3/2016 4.00 PROD3 DRILL SVRG T PJSM,fill out proper permits,Tear 7,380.0 7,380.0 03:00 07:00 down pump#2 and replace failed seal,clear suction screen on pump# 1,and clear suction line, 12/3/2016 12/3/2016 0.25 PROD3 DRILL DLOG P RIH, Log the RA marker correction of 7,380.0 7,430.0 07:00 07:15 plus 4.0',7,410'-7,430' 12/3/2016 12/3/2016 1.25 PROD3 DRILL TRIP P Wiper back in hole,RIW 14 k 7,430.0 9,430.0 07:15 08:30 12/3/2016 12/3/2016 2.00 PROD3 DRILL WPRT P Clean hole from 9,420'up to 9,210', 9,430.0 9,437.0 08:30 10:30 lowering pump rate to 0.3 bpm to RIH, up to 1.3 bpm PUH,RIH to drill ahead. 12/3/2016 12/3/2016 5.00 PROD3 DRILL DRLG P OBD, 1.3 bpm at 3,558 psi,BHP 9,437.0 9,440.0 10:30 15:30 4245,WHP 355,IA 229,OA 0, pumping beaded pills,pumping new mud pills,Multiple BHA wipers and PU's to help improve weight transfer. Page 28/37 Report Printed: 12/29/2016 0 0 `'rli Operations Summary (with Timelog Depths) P,�4 Y 1B-18 C coPhimps , Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase. Op Code Activity Code Time P-T-X Operation (ftKB) End.Depth(ftKB) 12/3/2016 12/3/2016 4.00 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi,BHP 9,440.0 9,461.0 15:30 19:30 4300,WHP 500, IA 195,OA 0, continue to pump beaded pills, Multiple BHA wipers and PU's to help improve weight transfer. 12/3/2016 12/3/2016 0.75 PROD3 DRILL WPRT P PUH for BHA wiper to try and improve 9,461.0 9,461.0 19:30 20:15 weight transfer.Slight overpull at 9210 ft. 12/3/2016 12/4/2016 3.75 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi,BHP 9,461.0 9,495.0 20:15 00:00 4310,WHP 570,IA 195,OA 0, Multiple BHA wipers and PU's to help improve weight transfer. Swap mud.New mud at the bit at 9470 ft.New mud at surface at 9478 ft. 12/4/2016 12/4/2016 7.75 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi, BHP 9,495.0 9,555.0 00:00 07:45 4340,WHP 550, IA 227,OA 0, Multiple BHA wipers and PU's to help improve weight transfer. 12/4/2016 12/4/2016 0.25 PROD3 DRILL WPRT P Short wiper up hole,PUW 30 k 9,555.0 9,300.0 07:45 08:00 12/4/2016 12/4/2016 0.25 PROD3 DRILL WPRT P Wiper back in hole RIW 8 k 9,300.0 9,555.0 08:00 08:15 12/4/2016 12/4/2016 2.00 PROD3 DRILL DRLG P BOBD 1.3 bpm at 4,100 psi,BHP 9,555.0 9,565.0 08:15 10:15 4,334,WHP 589, IA 278,OA 0 12/4/2016 12/4/2016 2.00 PROD3 DRILL DRLG P OBD 1.3 bpm at 4,092 psi,BHP 9,565.0 9,577.0 10:15 12:15 4,366,WHP 611, IA 286,OA 0, pumping beaded pills again to assist with weight transfer. 12/4/2016 12/4/2016 1.00 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,113 psi,BHP 9,577.0 9,581.0 12:15 13:15 4379,WHP 608, IA 290,OA 0, pumping 40 bbl beaded pill followed by 20 bead-free mud. 12/4/2016 12/4/2016 1.10 PROD3 DRILL WPRT P Wiper up hole,PUW 30 k,jog the 5 9,581.0 7,050.0 13:15 14:21 inch,7,050'-7390'. 12/4/2016 12/4/2016 1.75 PROD3 DRILL TRIP 'P Discuss with town plan forward,due to 7,050.0 72.1 14:21 16:06 slow ROP,and weight transfer,POOH for agitator. 12/4/2016 12/4/2016 2.40 PROD3 DRILL PULD P Tag surface,PJSM,PUD drilling 72.1 0.0 16:06 18:30 BHA#31. Crew change.Prepare to function test BOPE. Bit grade 1-1-BU-A-X-I-BHA 12/4/2016 12/4/2016 1.00 PROD3 DRILL BOPE P Function test BOPE.Perform post test 0.0 0.0 18:30 19:30 greasing on stack and choke valves. 12/4/2016 12/4/2016 0.75 PROD3 DRILL SVRG P Service reel and injector. 0.0 0.0 19:30 20:15 12/4/2016 12/4/2016 2.25 PROD3 DRILL PULD P PJSM.PU and PD BHA#32 with 0.7° 0.0 0.0 20:15 22:30 AKO motor,agitator and RB HYC bit. 12/4/2016 12/5/2016 1.50 PROD3 DRILL TRIP P Bump up,reset counters,RIH.Close 0.0 4,827.0 22:30 00:00 EDC and shallow test agitator.Good test.Continue in the hole. 12/5/2016 12/5/2016 0.50 PROD3 DRILL TRIP P Continue to RIH with BHA#32. 4,827.0 6,955.0 00:00 00:30 12/5/2016 12/5/2016 0.25 PROD3 DRILL DLOG P Tie-in to the K1 for no correction. 6,955.0 7,000.0 00:30 00:45 12/5/2016 12/5/2016 1.00 PROD3 DRILL WPRT P Continue to RIH to bottom with BHA 7,000.0 9,581.0 00:45 01:45 #32. Page 29/37 Report Printed: 12/29/2016 I- ' Operations Summary (with Timelog Depths) 0 1B-18 conocopholips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/5/2016 12/5/2016 2.75 PROD3 DRILL DRLG P BOBD. Pumping 1.3 bpm at 4400 psi. 9,581.0 9,600.0 01:45 04:30 BHP=4320 psi.WOB=0.6 Klbs. ROP 5-8 fph. 12/5/2016 12/5/2016 8.25 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,254 psi, BHP 9,600.0 9,653.0 04:30 12:45 4,382,WHP 573, IA 355,OA 0 12/5/2016 12/5/2016 0.25 PROD3 DRILL WPRT P Short 100'BHA wiper up hole,PUW 9,653.0 9,653.0 12:45 13:00 25 k 12/5/2016 12/5/2016 2.50 PROD3 DRILL DRLG P BOBD, 1.3 bpm at 4,370 psi, BHP 9,653.0 9,680.0 13:00 15:30 4,379,WHP 583,IA 334,OA 0 12/5/2016 12/5/2016 0.25 PROD3 DRILL WPRT P Wiper up hole to 8,700', PUW 26 k 9,680.0 8,700.0 15:30 15:45 12/5/2016 12/5/2016 0.50 PROD3 DRILL WPRT P Wiper back in hole RIW 12 k 8,700.0 9,680.0 15:45 16:15 12/5/2016 12/5/2016 1.75 PROD3 DRILL DRLG P BOBD 1.3 bpm at 4,330 psi,BHP 9,680.0 9,687.0 16:15 18:00 4,390,WHP 587,IA 323,OA 0 12/5/2016 12/5/2016 0.50 PROD3 DRILL WPRT P BHA Wiper. Difficulty getting back to 9,687.0 9,687.0 18:00 18:30 bottom. 12/5/2016 12/5/2016 2.00 PROD3 DRILL DRLG P BOBD. 1.3 bpm at 4285 psi.BHP= 9,687.0 9,702.0 18:30 20:30 4360 psi.WOB 0-1.4 Klbs.ROP <10fph. IA 348 psi OA=0. 12/5/2016 12/5/2016 1.75 PROD3 DRILL WPRT P PUH for wiper to the window.Pulled 0,702.0 7,400.0 20:30 22:15 heavy at 9367 ft and 9220 ft.Jog 5" casing 2x. 12/5/2016 12/5/2016 0.25 PROD3 DRILL DLOG P RBIH. Log RA for a+4 ft correction. 7,400.0 7,420.0 22:15 22:30 12/5/2016 12/5/2016 1.00 PROD3 DRILL WPRT P Continue RIH.Took weight at 9207 ft, 7,420.0 9,702.0 22:30 23:30 9226 ft and 9406 ft. 12/5/2016 12/6/2016 0.50 PROD3 DRILL DRLG P BOBD. 1.25 bpm at 4350 psi.BHP= 9,702.0 9,708.0 23:30 00:00 4360 psi.WOB 1.2 Klbs.ROP 15fph. IA 348 psi OA=0. 12/6/2016 12/6/2016 9.75 PROD3 DRILL DRLG P Continue drilling ahead pumping 1.25 9,708.0 9,790.0 00:00 09:45 bpm at 4280 psi.BHP=4340. IA 346psi,OA Opsi. Begin pumping 20bbls beaded pills followed by 20bbls mud from the active. BHA wipers as required to help maintain weight transfer. 12/6/2016 12/6/2016 2.50 PROD3 DRILL CIRC P TD called at 9790'. Wiper up hole and 9,790.0 8,870.0 09:45 12:15 circulate beaded pill out. Clean hole. Build Hi/Lo vis sweeps. 12/6/2016 12/6/2016 1.00 PROD3 DRILL WPRT P RBIH to TD at 9790'. Pump 10x10 8,870.0 9,790.0 12:15 13:15 Hi/Lo sweeps at 1.2 BPM and 4300 psi. IA 371 psi,OA 0 psi. 12/6/2016 12/6/2016 0.75 PROD3 DRILL WPRT P Chase 10x10 sweep to 7060'. 9,790.0 7,060.0 13:15 14:00 Decrease rate to.5BPM through window at 7400'. Increase rate back to 1.3 BPM up to 7060'. 12/6/2016 12/6/2016 0.75 PROD3 DRILL WPRT P RBIH past EOB to 7970'. Pump 7,060.0 7,970.0 14:00 14:45 10x10 sweep at 1.3 BPM and 4300 psi. 12/6/2016 12/6/2016 2.37 PROD3 DRILL WPRT P PUH and chase sweep to window. 7,970.0 69.4 14:45 17:07 Decrease rate to.5BPM through window at 7400'. Continue wiper to swab. 12/6/2016 12/6/2016 1.64 PROD3 DRILL TRIP P RBIH to confirm TD. 69.4 6,944.0 17:07 18:45 12/6/2016 12/6/2016 0.24 PROD3 DRILL DLOG P Log for K1 Marker and make 6,944.0 6,980.2 18:45 19:00 correction of+.5 ft. Page 30/37 Report Printed: 12/29/2016 Operations Summary (with Timelog Depths) 0 a 1B-18 Conoc }hilli ps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/6/2016 12/6/2016 1.22 PROD3 DRILL TRIP P Continue RIH to confirm 6,980.2 9,788.0 19:00 20:13 TD slight tag at 9,226 ft and 9,476 ft confirmed TD is at 9,788 ft. 12/6/2016 12/7/2016 3.78 PROD3 DRILL DISP P Start PUH and laying in liner running 9,788.0 78.1 20:13 00:00 pill which is 12 ppg Potassium Formate with 2 ppg beads after pill reaches the bit Paint flags at window and KWF with beads is being laid in while POOH 12/7/2016 12/7/2016 1.20 PROD3 DRILL OWFF P At surface.Prep for flow check and 78.1 78.1 00:00 01:12 then perform a 30 minute flow check. 12/7/2016 12/7/2016 0.64 PROD3 DRILL PULD P L/D BHA#32. 78.1 0.0 01:12 01:50 Note:Bit Graded Out at 1 -1 -bu-a- x-i-ct-td 12/7/2016 12/7/2016 3.83 COMPZ3 CASING PULD P PJSM and begin M/U 49 jts of liner. 0.0 1,545.6 01:50 05:40 P/U BHA#33 w/liner running assembly. 12/7/2016 12/7/2016 2.00 COMPZ3 CASING RUNL P RIH with BHA#33 and 49 jts of slotted 1,545.6 8,100.0 05:40 07:40 liner w/non=ported bullnose.Tie in to at flag for-5'correction. PUW 26K. Continue RIH clean through window and build section. 12/7/2016 12/7/2016 2.00 COMPZ3 CASING RUNL P Start stacking weight at 8410',begin 8,100.0 9,787.0 07:40 09:40 working liner assembly down. Work liner by varying speeds and pump rates through tight spots at 8410', 8456',8704',8798',8934',&8976'. Heavy PU weights throughout. Work liner down to TD at 9787.4'pumping min rate. PUW 30K. Stack down WOB-8.5K. Release lower liner assembly at 9785'pumping 1.2 BPM, PUW 25K. Reset counter. TOL at 8284'. 12/7/2016 12/7/2016 2.90 COMPZ3 CASING TRIP P POOH and paint window flag at 6644'. 9,787.0 43.9 09:40 12:34 Continue POOH pumping across top. 12/7/2016 12/7/2016 0.60 COMPZ3 CASING OWFF P At surface. Prep for flow check and 43.9 0.0 12:34 13:10 then perform a 30 minute flow check. Good. 12/7/2016 12/7/2016 2.50 COMPZ3 CASING PULD P L/D BHA#33 over dead well. PJSM 0.0 705.8 13:10 15:40 and begin M/U 21 jts of liner.P/U BHA #34 w/liner running assembly. 12/7/2016 12/7/2016 1.88 COMPZ3 CASING RUNL P RIH w/BHA#34 and 21 jts slotted liner 705.8 8,284.0 15:40 17:33 w/ported bullnose. 12/7/2016 12/7/2016 0.33 COMPZ3 CASING RUNL P Tag top of liner at 8,284 ft.PUH for a 8,284.0 7,620.0 17:33 17:52 weight check and then tag again. Bring pump online and release off of upper liner assembly.Top of liner now at 7,620 ft. 12/7/2016 12/7/2016 5.70 COMPZ3 CASING TRIP P PUH slowly and start to displace well 7,620.0 33.5 17:52 23:34 with 8.7 drilling fluid through the GS pumping slow due to annular pressure after well has been swapped over to drilling fluid,pump a Hi/Lo sweep and chase up to the 5"and make several jogs and then chase sweep to surface Page 31/37 Report Printed: 12/29/2016 "' Operations Summary (with Timelog Depths) i► 1B-18 :le �fr� Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/7/2016 12/8/2016 0.42 COMPZ3 CASING TRIP P At surface.PJSM and then begin 33.5 33.5 23:34 00:00 Pressure Undeploy Operations. 12/8/2016 12/8/2016 0.80 COMPZ3 CASING PULD P Pressure undeploy BHA#34. 33.5 33.5 00:00 00:48 12/8/2016 12/8/2016 0.19 COMPZ3 CASING PULD P L/D BHA#34. 33.5 0.0 00:48 00:59 12/8/2016 12/8/2016 0.30 COMPZ3 CASING PULD P P/U BHA#35 w/Anchored Billet 0.0 72.9 00:59 01:17 12/8/2016 12/8/2016 1.35 COMPZ3 CASING PULD P Pressure deploy BHA#35. 72.9 72.9 01:17 02:38 12/8/2016 12/8/2016 1.70 COMPZ3 CASING TRIP P RIH w/anchored billet 72.9 6,950.0 02:38 04:20 12/8/2016 12/8/2016 0.19 COMPZ3 CASING DLOG P Log K1 Marker and make a correction 6,950.0 6,980.0 04:20 04:31 of-1 ft 12/8/2016 12/8/2016 0.20 COMPZ3 CASING TRIP P Continue RIH w/Anchored Billet 6,980.0 7,620.6 04:31 04:43 12/8/2016 12/8/2016 0.39 COMPZ3 CASING TRIP P Tag top of liner at 7,620.6 6,620.6 6,609.6 04:43 05:07 ft release off of billet with no issues TOB is at 7,608.6 ft. 12/8/2016 12/8/2016 1.50 COMPZ3 CASING TRIP P 'POOH 6,609.6 72.9 05:07 06:37 12/8/2016 12/8/2016 1.00 COMPZ3 CASING PULD P PJSM and PUD BHA#35. 72.9 72.9 06:37 07:37 12/8/2016 12/8/2016 0.75 COMPZ3 CASING PULD P LID BHA#35 72.9 0.0 07:37 08:22 12/8/2016 12/8/2016 0.75 COMPZ3 CASING PULD P P/U BHA#36 0.0 0.0 08:22 09:07 12/8/2016 12/8/2016 1.00 PROD4 DRILL PULD P PJSM,PD kickoff/drilling BHA#36 0.0 72.2 09:07 10:07 12/8/2016 12/8/2016 1.55 PROD4 DRILL TRIP P RIH w/AL2 kickoff/drilling BHA#36, 72.2 6,949.0 10:07 11:40 2.0 AKO motor and RB HCC bi-center bit 12/8/2016 12/8/2016 0.23 PROD4 DRILL DLOG P Log K1 marker for-1 ft.correction. 6,949.0 6,976.0 11:40 11:54 12/8/2016 12/8/2016 0.50 PROD4 DRILL TRIP P Continue RIH. 6,976.0 7,610.0 11:54 12:24 12/8/2016 12/8/2016 1.10 PROD4 STK KOST P Dry tag TOB at 7610',PUW 27K. 7,610.0 7,640.0 12:24 13:30 Begin milling billet,drill off billet to 7640'. PUH to 7582'. Dry drift clean past billet area. No issues. 12/8/2016 12/8/2016 5.83 PROD4 DRILL DRLG P Continue drilling ahead,pumping 1.3 7,640.0 7,981.0 13:30 19:19 BPM,at 3900 psi.BHP=4200 psi, WHP=430 psi.WOB-1-1.5 Klbs, ROP-50-80 FPH 12/8/2016 12/8/2016 1.59 PROD4 DRILL WPRT P Having weight transfer 7,981.6 7,981.6 19:19 20:55 issues pump a 5 x 5 sweep and chase up hole to 5" jog this area several times to clean up and then RBIH Note: Increased amount of cuttings seen across shaker after wiper 12/8/2016 12/9/2016 3.08 PROD4 DRILL DRLG P BOBD,pumping 1.4 BPM,at 4036 psi. 7,981.6 7,999.0 20:55 00:00 BHP=4100 psi,WHP=366 psi. WOB-1-2.4 Klbs,ROP-8 to 10 FPH Page 32/37 Report Printed: 12/29/2016 1. Operations Summary (with Timelog Depths) 0 1B-18 Conoccehillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/9/2016 12/9/2016 8.30 PROD4 DRILL DRLG P Drilling ahead in 1B-18 AL2 Build 7,999.0 8,054.0 00:00 08:18 section,pumping 1.4 BPM,at 4142 psi.BHP=4100 psi,WHP=500 psi. WOB-2-2.9 Klbs, ROP-8 to 10 FPH Note:Got back confirmed samples of Ankorite at 01:15hrs 12/9/2016 12/9/2016 3.40 PROD4 DRILL DRLG P Pump 5x5 sweep. PUW 26K. 8,054.0 8,085.0 08:18 11:42 Continue drilling ahead in build section. ROP picking up to-10- 20FPH, 1.3 BPM,at 4000 psi,BHP 4200,WHP 415,WOB 2.5 Klbs. 12/9/2016 12/9/2016 0.10 PROD4 DRILL SRVY P PU for geo survey. PUW 26K. Lower 8,085.0 8,068.0 11:42 11:48 pump rate to 1 BPM. Obtain clean geo survey. 12/9/2016 12/9/2016 3.50 PROD4 DRILL DRLG P BOBD, 1.3 BPM,4100 psi,WHP 420, 8,068.0 8,090.0 11:48 15:18 BHP 4200,WOB 1.2Klbs,ROP-10 FPH,IA 383,OA 0. Pumping 5x5 sweeps and pick ups as needed. 12/9/2016 12/9/2016 0.50 PROD4 DRILL DRLG P Drilled ahead to EOB at 8102.58 ft. 8,090.0 8,102.6 15:18 15:48 12/9/2016 12/9/2016 1.50 PROD4 DRILL WPRT P Pumped final 10x10 sweep. Chased 8,102.6 72.9 15:48 17:18 to 7060. Decrease rate to.3 BPM through window. RBIH and jog 5" casing from 7040'-8090'.Continue chase sweep out of hole. 12/9/2016 12/9/2016 1.68 PROD4 DRILL PULD P PJSM and begin pressure undeploy 72.9 72.9 17:18 18:58 BHA#36 12/9/2016 12/9/2016 1.00 PROD4 DRILL PULD P L/D BHA#36 72.9 0.0 18:58 19:58 12/9/2016 12/9/2016 2.02 PROD4 WHDBOP BOPE P Prep(Stab back on well with nozzle 0.0 0.0 19:58 22:00 and jet on stack several times,grease stack,etc.) for BOPE test. 12/9/2016 12/10/2016 2.00 PROD4 WHDBOP BOPE P Start full bi-weekly BOPE test. Test 0.0 0.0 22:00 00:00 wiitness waived by Jeff Jones, AOGCC. 12/10/2016 12/10/2016 5.00 PROD4 WHDBOP BOPE P Complete full bi-weekly BOPE test 0.0 0.0 00:00 05:00 250 psi/3500 psi including inner reel valve(6 hour test). No test failures. 12/10/2016 12/10/2016 1.12 PROD4 DRILL CTOP P PJSM and prep to cut coil and perform 0.0 0.0 05:00 06:07 slack management. Remove CTC, boot end of wire to seal for slack management. 12/10/2016 12/10/2016 6.78 PROD4 DRILL CTOP P Cut 1,600'of coil and 1,612'of eline. 0.0 0.0 06:07 12:54 Install boot end of wire and heat shrink wrap. Perform slack management. Cut an additional 100'of coil(Cut 1,700'total of coil and 1,612'total of eline). 12/10/2016 12/10/2016 4.50 PROD4 DRILL CTOP P Prep coil and re-head CTC,pull test 0.0 0.0 12:54 17:24 50k,re-head,install UQC,P/T 4,500 psi,displace coil to drilling fluid. 12/10/2016 12/10/2016 2.60 PROD4 DRILL PULD P P/U BHA#37(AL2 Lateral Drilling 0.0 72.8 17:24 20:00 BHA)and presure deploy Page 33/37 Report Printed: 12/29/2016 .. 0 • 0 Operations Summary (with Timelog Depths) 1B-18 Conoc 'hitllps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Star Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKS.) 12/10/2016 12/10/2016 1.00 PROD4 DRILL EQRP T After pressure deploying and ready to 72.8 72.8 20:00 21:00 RIH,lost power to tools pressure undeploy, troubleshoot,repair and pressure deploy again. Note:Problem was 1/4"of the eline at the UQC was found to have been scrapped bare and was shorting out. Wire cut and reheaded. 12/10/2016 12/10/2016 1.40 PROD4 DRILL TRIP P RIH with EDC open pumping at 1 bpm 72.8 6,950.0 21:00 22:24 to facilitate pushing slack forward. 12/10/2016 12/10/2016 0.22 PROD4 DRILL DLOG P Log for K1 Marker and make 6,950.0 6,973.0 22:24 22:37 correction of minus 2 ft. 12/10/2016 12/10/2016 0.61 PROD4 DRILL TRIP P Continue RIH (closed the EDC at 6,973.0 8,102.0 22:37 23:13 7,350 ft) 12/10/2016 12/11/2016 0.77 PROD4 DRILL DRLG P BOBD.Pumping at 1.4 bpm Circ 8,102.0 8,172.0 23:13 00:00 Press 4,077 WHP 379 BHP 4,223 WOB 1.6 klb ROP 64 to 88 fph 12/11/2016 12/11/2016 4.00 PROD4 DRILL DRLG P BOBD.Pumping at 1.4 bpm Circ 8,172.0 8,326.7 00:00 04:00 Press 4,077 WHP 379 BHP 4,223 WOB 1.6 klb ROP 64 to 88 fph Note: Around 8,320 ft ROP slowed drastically Geo thinks it's the fault 12/11/2016 12/11/2016 0.38 PROD4 DRILL WPRT P Perform a 300 ft wiper trip to help 8,326.7 8,326.7 04:00 04:22 alliviate weight transfer issues we are either in ankorite or at the fault or both we have pumped several sweeps prior to PUH 12/11/2016 12/11/2016 4.41 PROD4 DRILL DRLG P BOBD.Pumping at 1.5 bpm Circ 8,326.7 8,332.0 04:22 08:47 Press 4,215 WHP 437 BHP 4,259 WOB 1.0 klb ROP 1 to 2 FPH. PU's as needed. 12/11/2016 12/11/2016 5.39 PROD4 DRILL DRLG P ROP averaging 2-4 FPH. Drilling 8,332.0 8,347.1 08:47 14:10 ahead, 1.5 BPM,Circ 4100 psi,WHP 342 psi,BHP 4210 psi,WOB 1.5-2 klbs. 12/11/2016 12/12/2016 9.82 PROD4 DRILL DRLG P Continue drilling ahead at 3-5 FPH, 8,347.1 8,378.4 14:10 00:00 1.4 BPM,Circ 4115 PSI,WHP 250 psi, BHP 4149 psi,WOB 1-3 klbs. 12/12/2016 12/12/2016 8.00 PROD4 DRILL DRLG P Continue drilling ahead at 3-5 FPH, 8,378.4 8,400.0 00:00 08:00 1.4 BPM,Circ 4115 PSI,WHP 250 psi, BHP 4149 psi,WOB 1-3 klbs. PU's and restarts as needed. 12/12/2016 12/12/2016 0.90 PROD4 DRILL DRLG P Swap to mud system#8(8.65 ppg 8,400.0 8,400.0 08:00 08:54 PowerPro SF)with new mud at the bit at 8,400 ft and continue drilling ahead. 12/12/2016 12/12/2016 6.30 PROD4 DRILL DRLG P Continue drilling ahead 3-5 FPH, 1.5 8,400.0 8,414.0 08:54 15:12 BPM,Circ 3950 psi,WHP 505,BHP 4140 psi,WOB 2-3 Klbs. PU's and restarts as needed.Adjust trip schedule holding 11.8 ppg at window to help with losses Geo samples continue to show—15%ankorite. Page 34/37 Report Printed: 12/29/2016 V;$. Operations Summary (with Timelog Depths) 1B-18 £. ConocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/12/2016 12/12/2016 4.28 PROD4 DRILL DRLG P Continue drilling ahead-2-4 FPH, 1.5 8,414.0 8,421.2 15:12 19:28 BPM,Circ 4000 psi,WHP 500,BHP 4140 psi,WOB 2-3 Klbs. PU's and restarts as needed. 12/12/2016 12/12/2016 0.40 PROD4 DRILL TRIP P Discuss with town and decision made 8,421.2 8,200.0 19:28 19:52 to POOH for new motor and bit. PUW 26K. 12/12/2016 12/12/2016 2.00 PROD4 DRILL TRIP P Pump 5x5 sweep and chase to 8,200.0 71.6 19:52 21:52 window at 7,393',Jog 5"casing from 7,060'to 7,373'. POOH w/open EDC. 12/12/2016 12/12/2016 1.00 PROD4 DRILL PULD P PJSM,PUD BHA#37. 71.6 71.6 21:52 22:52 Bit grade 7-5-bt-a-x-i-ct-pr 12/12/2016 12/12/2016 0.60 PROD4 DRILL PULD P M/U BHA#38 w/Weatherford.5°AKO 71.6 71.6 22:52 23:28 motor and a SRFE3408MB7 HYC bit. 12/12/2016 12/13/2016 0.52 PROD4 DRILL PULD P PJSM and start PD BHA#38. 71.6 71.6 23:28 00:00 12/13/2016 12/13/2016 0.40 PROD4 DRILL PULD P Completed pressure deploying 71.6 71.6 00:00 00:24 BHA#38 w/.5°AKO Weathford motor and a SRFE3408MB7 HYC bit. 12/13/2016 12/13/2016 1.40 PROD4 DRILL TRIP P RIH with open EDC pumping at 71.6 6,945.0 00:24 01:48 minimum rate 12/13/2016 12/13/2016 0.27 PROD4 DRILL DLOG P Log K1 Marker and make correction of 6,945.0 6,973.0 01:48 02:04 minus 2 ft 12/13/2016 12/13/2016 0.49 PROD4 DRILL TRIP P Continue RIH with now closed EDC 6,973.0 8,422.0 02:04 02:33 pumping minimum rate. 12/13/2016 12/13/2016 1.55 PROD4 DRILL DRLG P BOBD. Pumping at 1.41 bpm Circ= 8,422.0 8,446.0 02:33 04:06 4,248 WHP=562 CTW=13.66 ROP=7 fph WOB=2.24 klb Note:Experiencing some severe vibration issues once on bottom drilling Note:Aftyer 10 minutes on bottom drilling,computer screens for DD goes pink,,,,,,,,,,PUH and re-boot computers RBIH and continue drilling....5 minute delay. 12/13/2016 12/13/2016 3.27 PROD4 DRILL DRLG P Pumping at 1.39 bpm Circ=4,078 8,446.0 8,510.0 04:06 07:22 WHP=560 CTW=6.30 ROP=24 to 75 fph WOB=2.24 klb Note:We seemed to have broke through after 8,440 ft.This is wher we had our last stall and now the ROP is increasing 12/13/2016 12/13/2016 1.80 PROD4 'DRILL WPRT P After 0700 hr morning meeting 8,568.0 7,080.0 07:22 09:10 engineer called and due to faulting into the Miluveach Formation,pump a 10 x 10 sweep and chase up hole(jog 5"several times)and hopefully by that time twon will have a decision on a way forward(plug back or run liner). PUH and pump a 10 x 10 sweep and chase up hole once out of bit. PUW= 27 k Having issue with choke periodically clogging more clay coming across shaker now make several jogs in 5" Page 35/37 Report Printed: 12/29/2016 Operations Summary (with Timelog Depths) 0 1B-18 ConocoPhitli ps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/13/2016 12/13/2016 1.10 PROD4 DRILL TRIP P Another call from town and instructed 7,080.0 8,542.0 09:10 10:16 once completing jogs in 5",RBIH and pump another sweep and chase up hole again as above whilst meetings are being held on AL2 Lateral's status 12/13/2016 12/13/2016 3.34 PROD4 DRILL TRIP P BOB. After 5 x 5 exits bit plus a few 8,542.0 72.8 10:16 13:37 bbls,chase up hole,jog through 5" again and chase to surface. Note:Town called again and decision made to run liner. 12/13/2016 12/13/2016 1.38 PROD4 DRILL TRIP P At surface,RBIH to called TD to start 72.8 6,948.0 13:37 15:00 laying in liner running pill and then KWF 12/13/2016 12/13/2016 0.23 PROD4 DRILL DLOG P Log the K1 Marker and make a 6,948.0 6,992.0 15:00 15:13 correction of minus 2 ft 12/13/2016 12/13/2016 0.92 PROD4 DRILL TRIP P Continue RIH to 8,230 ft 6,992.0 8,230.0 15:13 16:09 12/13/2016 12/13/2016 2.35 PROD4 DRILL DISP P After liner running pill gets to the bit 8,230.0 72.8 16:09 18:30 and above,start PUH and laying in pill and then KWF. Paint flags at 6,900 ft and 6,000 ft,continue laying in beaded liner pill to surface. 12/13/2016 12/13/2016 0.50 PROD4 DRILL OWFF P On surface,monitor well for flow, 72.8 72.8 18:30 19:00 PJSM-LD BHA over open hole. 12/13/2016 12/13/2016 0.85 PROD4 DRILL PULD P LD BHA#38 72.8 0.0 19:00 19:51 12/13/2016 12/13/2016 0.65 COMPZ4 CASING PUTB P Prep floors for liner run. PJSM- 0.0 0.0 19:51 20:30 running liner 12/13/2016 12/13/2016 1.95 COMPZ4 CASING PUTB P MU AL2 liner assembly-bullnose,21 0.0 1,202.2 20:30 22:27 jts slotted,Halliburton swell packer, 17 jts solids,6 ft SBR deployment sleeve. BOP drill.Clean floors. 12/13/2016 12/13/2016 0.90 COMPZ4 CASING PUTB P PJSM-MU AL2 liner assembly to BHA 1,202.2 1,246.4 22:27 23:21 #39, MU to CoilTrac tools,surface test. 12/13/2016 12/14/2016 0.65 COMPZ4 CASING RUNL P RIH with AL2 liner assembly 1,246.4 3,990.0 23:21 00:00 12/14/2016 12/14/2016 1.40 COMPZ4 CASING RUNL P Continue RIH,tie in at flag for minus 3,990.0 8,196.0 00:00 01:24 3.04 ft, PUW 26k,continue RIH,stack at 8,058 ft,work liner down to 8,196 ft, PUW 28k,WOB-2.7k, 12/14/2016 12/14/2016 0.20 COMPZ4 CASING RUNL P Release off liner at 1.3 bpm,PUW 8,196.0 6,994.0 01:24 01:36 23k,WOB 2.6k,reset counters to bit depth.Mid element of swell packer at 7,535 ft,TOP of SBR at 6,994 ft. 12/14/2016 12/14/2016 2.20 COMPZ4 CASING DISP P Displace well to seawater,LRS on 6,994.0 6,994.0 01:36 03:48 site,PJSM with LRS 12/14/2016 12/14/2016 1.00 COMPZ4 CASING TRIP P POOH pumping seawater to 2,500 ft. 6,994.0 2,500.0 03:48 04:48 LRS P/T lines and equipment. 12/14/2016 12/14/2016 1.20 COMPZ4 CASING FRZP P 2,500 ft.LRS pump 30 bbls diesel, 2,500.0 500.0 04:48 06:00 RDMO LRS. Open EDC at 500 ft 12/14/2016 12/14/2016 0.25 COMPZ4 CASING TRIP P Continue POOH 500.0 42.8 06:00 06:15 12/14/2016 12/14/2016 1.40 COMPZ4 CASING PULD P At surface,tagged up.Pressure 42.8 42.8 06:15 07:39 Undeploy after PJSM. 12/14/2016 12/14/2016 0.35 COMPZ4 CASING PULD P L/D BHA#39. 42.8 0.0 07:39 08:00 Page 36/37 Report Printed: 12/29/2016 • ! ` Operations Summary (with Timelog Depths) : ,, llama # &Mail 1B-18 C.onocoPhiiiips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/14/2016 12/14/2016 1.00 DEMOB WHDBOP MPSP P Prep for BPV installment. 0.0 0.0 08:00 09:00 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP MPSP P Valve Crew shows up and installs 0.0 0.0 09:00 11:00 BPV 12/14/2016 12/14/2016 5.00 DEMOB WHDBOP DISP P Pump corrosion Inhibitor through coil 0.0 0.0 11:00 16:00 and then blow down coil. 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP RURD P Start rig move check list,blow down 0.0 0.0 16:00 18:00 steam lines,disconnect PUTZ, remove mouse holes,etc.... 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP NUND P ND BOPE,torque checked,remove 0.0 0.0 18:00 20:00 kill and deployment lines. "`Rig released at 20:00 on 12/14/2016. Page 37/37 Report Printed: 12/29/2016 • S C, co co Q co ^ Q rn O ZD Yv2o 2 o � � ,2 h- woo- krCD `�NE o taCE0 Q°'‘c2O I �0 T z`' al oCCOCOQ c w co2mor)i 4� Y1-J 7oQ '2oo c> Y C J y` 00 N o pj OQ c ?Q I YF-_I II co I c'7 a,Q J O II olo I I c o Y O Q 4, co 3 ��o II I Lo cOOQ.= co o , HA II 11 N N c0 MN UN MOU V (0OQ � � � II 11U 2 .t T II///n m_ N it �/1-0 a N E II_. _ c. (oc. cor E cn II //a �, -0 © .. (,) co (pp ,,,, a o II II // _ 0 05 II II // C Q �co f\00 II II Q Q g N O N K7 Jm @ O 13 4) O \II �� ���c co O co - NriN f0 �- C // " O<9 in JU ON N _ NQ OM2aco M �� �, oY 11 /� II ��� coN O 0 a) N U` MY11. co a.0 N " A /, II Q EO o- Qars U � Q N % �Q % YAYcrs if) 0 Y 3 o ��� � it II c1mc U co coo X mmmm in N � 2 G a06N = % �\ IL II i49C- \\ JI // 11c0 % % // S II �/ N ��� lelLA `° 1 t /l cn hs ) a L I o U 1 as as 75 I O �cr 2 N � Q 0Q CO (Da UN O co in O) r co 20) Q ti as N co Ca O - Jr ,- C -o ' O Q al C - Ali r tC,V UQUON UO f`N �` / N CO N CO N - to Q r.- 00 _ Q � � CO 0 CO , 6: .11 dti U LI_ X Zs 4 J @in O Nr4t X Yc') U `- N- 0 M H to 1 r c L O )0v, ~ LJ E> z - _Do L ' c ` 4 - vs � N Y O• t CO v E v wwa'w ° . . . . . . . .- - r - uo +� o v 11 Doo v a a ai C >._ O o w m + ca •� -a �VIm u c -a a .I a tt ~ Y O L U E O- m QO i t0 .0 CO CO 0 X. t0 CO f0 (O CO (p N L O L _1 U E 4- r -a u — _ 0 0 0 U U U U U c) u u u > L a +, S- „,, N c < X 0 0 0 0 0 0 0 0 0 0 0 2 ,.= c L - c w N M a CO r Orn o o CO co N C Z I-- N N N N N N N M M M r- u -c f4 p +' Z Q v j EJ Q O C L • a, -10 , u c 0 o 0 0 0 0 0 0 0 0 0 c L a, p g a J J J J J J J J J J J J - C 4= 0 WWWWWLIJWWWWWW in a C 3 H LL LL LL LL LL LL LL LL LL LL LL LL O " Q J J J J J J J J J J J J Q L > C a) K" F- Q Q Q Q Q Q Q Q Q Q Q Q N .n i Ci Q% . Z Z ZZZ Z ZZZZZZ UU L 0 W . �' "�' LL LL LL LL. LL LL LL LL U. L. LL LL K L c > rI. To .U+ > - v ++ C Q1 } L O L E v u v t- v, a a) u O r' Z C _O oA 0 co w.. �+ - m' 4, u L C .-r [ a o cn > U N + C O G k (C a ° C E roz: N ..NC = < ) aa V a ` u 03 wi- LL ) C) 0 U , m v) d G u -63) 45' J 06 w U m d a rim m 0 TD Q F a ccs a) L" -) CM ro os -.co• GO LC ..., c z c9 G coin w O W .1 1OJU d J J J J J J J O J J J J ' Q ; '0: 2333333 3 t 3333 Z R co ,w V1 cu E Wo AV 1 IIC Ce W Ce CC CL a a a Ce a a a Ill w w w w w w w w w w w L" > > > > > > > > > > > > Q' creca' a ce w d' a' a' Q' 2 z Y Y Y Y Y Y Y Y Y Y Y Y ciDMDDDDDMMDD _, CYCLCLCCWCCCLCGCLCCC‘ Ce 11 2 tri W Q Q Q Q Q Q Q Q Q Q Q Q 01 y„ a a a 0. a a a LL a a Cl. a = 0 > > > > > > > > > > D Y Y Y Y Y Y Y Y Y Y Y Y 0. c L u j Z. - op O Q w in N co r t0 r N 0) 0 N X In .0 N K o 0 0 0 0 0 o M o 0 0 o E 0 0 0 0 o O O o 0 0 o O w `d't 0 000000000000 IA O C U 4. 00 0 U U LL LL Y LL LL LL ti ea > 0 co co co co F- H F F H 0 1- 7cc, 0 0 0 0 o 0 cso 0 0 0 0 > c w O aa a a .- o a a a a a a +' O 0 cc 8 n 0 0 0 a a a o a a a a a Q RI. V' M •O' r 0 cr N CO N M N Uf) ... • 0 O M 0 0 CO 0 N 0) (0 N �.. = O- IM\ N 0) N r M N Cr M .- N O E '- N N N N N N N N N N N N N L E c) o) o) o) o) C) o) o) o) d) o) r) c • a 0 N N N N N N N N N N N O (00 01 0 0 0 0 0 0 0 0 0 0 0 ti. o u 46 0 0 0 0 0 0 0 0 0 0 0 4+ •' c 0 C u) u) u) in u) u) III in u) v) u) In p. d O CO L Ujgg to U 0) u • 01 _� w Y Ce vl E E tiAll f" 6! y'14 .i �n )n Q CO r O N M N c Y ti . Z pp r 0 N O O +'• E N 0 0 = 2 V^ I� r Il x J m Y Q 6 Q E in MINN d Q N N N r N N H z in p p F m a, E E O Via Q H a a H Fa ' AF T • • �w&y\\1/// s THE STATE Alaska Oil and Gas of L JSKA Conservation Comm1ss1on 333 West Seventh Avenue ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 +' "'` Main: 907.279.1433 AF ALAS'" Fax: 907.276.7542 www.aogcc.alaska.gov Jason Burke CTD Coordinator KANNELI ui-u 4 2 4 2117 ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1B-18 Permit to Drill Number: 194-061 Sundry Number: 316-416 Dear Mr. Burke: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /°;1-ea/t- Cathy . Foerster �,r _ Chair DATED this /eray of August, 2016. RBDMS V- AUG 2 5 2016 • STATE 0 RECEIVED OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION AUG 1 0 2015 APPLICATION FOR SUNDRY APPROVALS Ors(' '?if2 r� 20 AAC 25.280 OGC 1.Type of Request: Abandon ❑ Plug Perforations Q . Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑� • Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: ConocoPhillips Alaska Inc Exploratory ❑ Development ❑✓ . 194-061 3.Address: ❑ 6.API Number: Stratigraphic ❑ Service PO Box 100360,Anchorage AK 99510 50-029-22472-00 • 7.If perforating: .Tr77�1 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? NR ❑ KRU 1B-18" Will planned perforations require a spacing exception? Yes 111 No 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 25648 AU'466- Kuparuk River Field/Kuparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 7824' , 6941' - 7722' -' 6858' 3216 psi N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor 121' 16" 121' 121' 1640 psi 630 psi Surface 4255' 7-5/8" 4255' 4147' 7740 psi 6390 psi Intermediate Production 5273' 5-1/2" 7044' 6328' 6890 psi 4790 psi Liner 765' 5" 7809' 6929' 10500 psi 10140 psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 7131'-7575' t 6400'-6741' 3-1/2" L-80 6903' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): Packer:Baker FA-1 45A36 Packer , Packer:6933'MD&6254'TVD 12.Attachments: Proposal Summary Q Wellbore schematic ❑I 13.Well Class after proposed work: Detailed Operations Program ❑✓ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development LI • Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: k7/1 //4 OIL ❑ WINJ LiWDSPL ❑ Suspended k L' 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned r 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Jason Burke Email jason.burketa�cop.com Printed Name Jason Burke Title CTD Coordinator Signature ' Phone 659-6097 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: S\ .t.- `-( lie Plug Integrity ❑ BOP Test MV. Mechanical Integrity Test ❑ Location Clearance ❑ Other: /3 0 p re-5 t 7,-0 4 26b /75► /9-✓ 0t.,Iow" preyekilt- tis Z5 UO Ps 'Y l4ce�„ (k, �- appro ✓e-d pc 20 4-4c ZS. I r- j /`llt�k't„are f71�5 p Post Initial Injection MIT Req'd? Yes ❑ No [tr.' k"ks1 c Ink Spacing Exception Required? Yes ❑ Nod Subsequent Form Required: /d - 4 a 7 1 APPROVED BY RBDMS IA'.AUG 2 5 2016 Approved by:A, / , - COMMISSIONER THE COMMISSION Date: g_79__( - TL7-7- - W l. . Submit Form and Form 10-403 evised 1142D115 , r2I o p e ti i vfor 12 months from the date of approval. Attachments in Duplicate cr' 8 %I A/P. I (7 I alid d�;o/% 41110 •� • ,_ I ConocoPhillips AUG I 0 2016 Alaska P.O. BOX 100360 C ANCHORAGE,ALASKA 99510-0360 August 2, 2016 Commissioner-State of Alaska Alaska Oil &Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications to abandon the KRU 1B-18 by cementing up the perforations of both the A and C sands in order to set up to for CTD operations to drill a tri-lateral out of the KRU 1B-18 using the coiled tubing drilling rig, Nabors CDR2-AC./ A sundry application is attached to plug the KRU 1B-18 (194-061) perfs to allow these laterals to be drilled. As detailed in the attachments, ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A/C-sand perfs in 1B-18. Attached to this application are the following documents: — 10-403 Sundry Application to Abandon KRU 1B-18 (194-061) — Operations Summary in support of the 10-403 sundry application — Proposed CTD Schematic — Current Well Bore Schematic If you have any questions or require additional information, please contact me at 907-265-6097. Sincerely, Jason Burke ConocoPhillips Alaska Coiled Tubing Drilling Engineer • KRU 1B-18 CTD Summary for Plugging Sundry (10-403) Summary of Operations: KRU well 1B-18 is a Kuparuk NC-sand producer equipped with 3-1/2" tubing and 5" production casing. The CTD sidetrack will utilize three laterals to target the A4 sand to the northeast, east and west of the 1B-18.,/The laterals will access stranded resources. Prior to CTD operations the existing NC-sand perforations will be squeezed with cement. ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A/C-sand perforations in this manner. Following the cement squeeze Nabors CDR2-AC will exit the casing at 7505' & 7460' MD via a mechanical whip-stock. The laterals will be completed with 2-3/8" slotted liner from TD; 2 of the 3 laterals liners will be ran back into the mother bore. Using the maximum formation pressure in the area of 3880 psi in 1 B-08, the maximum potential surface pressure, assuming a gas gradient of 0.1 psi/ft, would be 3216 psi. CTD Drill and Complete 1B-18 Laterals: November 2016 Pre-CTD Work 1. RU Slickline: Dummy off gas lift mandrels, tag PBTD, obtain SBHP 2. RU Pumping: Swap hole over to diesel and perform injectivity test 3. RU Service Coil: Lay in cement plug and squeeze off the NC-sand perforations. Let cement harden, pressure test cement and under-ream cement down to 7525' MD. 4. RU E-line: Set whip-stock at 7505' MD �5 5. Prep site for Nabors CDR2-AC and set BPV. 1 Rig Work vc(\' 1. MIRU Nabors CDR2-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 1B-18A Sidetrack (A4 sand - Northeast) a. Mill 2.80" window at 7505' MD. b. Drill 3" bi-center lateral to TD of 11400' MD. c. Run 2%" slotted liner with an aluminum billet to 8900' MD 3. 1 B-18AL1 Sidetrack (A4 sand - East) a. KO billet at 8900' MD b. Drill 3" bi-center lateral to TD of 11300' MD. c. Run 2%" slotted liner with deployment sleeve back into mother bore 4. 1 B-18AL2 Sidetrack (A4 sand -West) a. Mill 2.80" window at 7460' MD. b. Drill 3" bi-center lateral to TD of 9575' MD. c. Run 2%" slotted liner with a deployment sleeve back into mother bore 5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD2-AC. Concv✓'. wel( 0.1'4' .& co/1*w tvr'T'► #0,*/ 4e.- .464 /:Iro eX/Sf we(l fort and revs cup /c of C4 jn'rn f reserves Cvrre,'r1/ fabs jroe/ d 6y "'y Tint%Fore, ,ip ref avd review ,s mcesfoi,, 8��6 Page 1 of 2 8/8/2016 • Post-Rig Work 1. PuII BPV 2. Obtain SBHP 3. Install gas lift design 4. Return to production Page 2 of 2 8/8/2016 • • Loepp, Victoria T (DOA) From: Burke,Jason <Jason.Burke@conocophillips.com> Sent: Tuesday,August 16, 2016 2:29 PM To: Loepp,Victoria T(DOA) Subject: BOP test pressures 1H-06&1B-18 1B-18:4200 psi 1H-06:3500 psi ConochiIIips Jason Burke Coiled?ubing Drilling Coordinator (0) 907-265-6097 (Si) 907-2314568 1 • I MP 11 0 ,, 11 1• .. a) .1 i) 0 I, '1 '. co g ., ;. 0 ., 0 0 ttoo in I, ., � i i m rn rn C) ., .. 2 '. U2 Lo to 0 2 '' .1 11 in rn CI.,,r „ ho M N CO C7 _ I-O . 1. 0 ,. Lo 1--I N a) 0 N ,, „ .r..- 2 ,1 J N- O CD V T CO Q 2 . .. v O ,. co<v O O m CO O CoWCOEa A J '• ,' p.V co W '. mO >. If) 0 N Cl)-.75O m 0 ., •' Q 3 Ili ,1 '-I— a c top a . I, O d ' . � n py . I' 05 n_ I y N� m- C .. .. m .• E I— V U)o mc�i °� a o n v N- ,' o E co E o c°'o u„o Cl)o .. .. .. o W p i) _© aim '' ,. .. '0 w O - Jct Cm en Y ,:p,A, ,, 1, ,, lJ ., i C 0o co p •N d N N Q- '. .,1 s. OM J U tON =NN n Ol ., ,1\I\ .. (A) ,, da) 6) E -' mr'm< Et 'I `Is\ '. m N O) 0 CD N O r Y LL CI w i `� ,, C ii N N N 2"I I )Y Y Y CO , • 1 1 •, mO 7 •c- to co m (o - 11 ,1 0 C') C')(O X mmmm toe) ;, Ii 1 \, I1 1 1\ ,1 I 1, 11 ,, 11 11 I I Ai'1 1' 1' 1, ' I 1, W 1, •• Ir I, I, in _Ali tu E I t L. 1 ../Iii Al c., " k, ... 'Tr I o ao❑ � to M rL p d. 2 °° •rn a r• i aa)to co 00 v� v _ c_' 0-r.- 0- CO _� N- t�ri� CO m c- N— N a, N t� U f p,n, N Lo N O O T- co VO a) 2U) Qf` -0O O i0 O`O o D CO N h N to a J J V N O U- X t6\_- 0M I—tt)To • • Cooti co co (.0 C) W Vin 0 LO C.0 ,-.1M rn - 0 CNI N CO M SS' M O mo co > co V N Q N CO E 0 >. v >- O 0 N AJ—L O - ,- rn Ud u)m E I- //��`� (0 N �1 0) V C V h LF _N 7 a) (0- c 0 cO O- -O CO o6N NO C1� G cco E `p C 0 N co U O O LLl 0 U L v X N 0 =LU ci) - ��U �tJ ,� O 0) O -J m co U O— W Q N O..N CO (O CO J O M U (0 N N- N C) N 01 4t E 6) INI'- N c 03 0 co co 03 m s-m Q 0)-O O N 0) 0 U N (3 C,', t C Q U II N N N fl-II 4) N (L) d) Cl)N E0C0 'E0 Y 0-- O M MCO X 03(003(0 to(`M .473 V i G co r i iiiii / , a / I1 l,0 N IT, I O CL Op Ca I y cr 0 a NJ 0 J 0 c D aoog fir, Q� 'C � 20 o� Jim rn c CU v°° c0 c Ni- , � in N M o IIrk N0 N� nlJ C�� Cl)N U�r CO O Co Q N 0 O O 2 T 0 COL 09 L 0_J H) N N _J N# N.- CO CO F-(n(n 'r-' KUP PROD 1B-18 ConocoPhillips Q Well Attributes Max Angle&MD TD Alaska.Inc. Wellbore APOLIWI Field Name Wellbore Status not(°) MD(ftKB) Act Atm(kKB) conoci'p {6 500292247200 KUPARUK RIVER UNIT PROD 43.20 6,897.51 7,824.0 ••• Comment H2S(ppm) Date Annotation End Data KB-Gnd(k) Rlg Release Date 113-19,12/62015459.13 PM SSSV:WRDP 160 11/8/2014 Last WO: 8/21/2012 40.81 4/30/1994 • Vertical schematic(actual) Annotation Depth(988) End Date Annotation Last Mod By End Date Last Tag:SLM 7477.0 12/17/2014 Rev Reason:REPLACE WRDP/SLIPSTOP pproven 12/6/2015 HANGER;25.3 -_.•. -.--:-.- 77--- Casing Strings Casing Denorlptlon 00(In) ID(In) Top(kKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread . ., iii--- ��'7L. CONDUCTOR 16 15.063 430 121.0 121.0 62.50 H-40 WELDED t, h 1 ,f Casing Description OD(in) ID(in) Top(1KB) Set Depth(898) Set Depth(TVD)...Wt/Len(I...Grade Top Thread - 551 L5, SURFACE 75/8 6.875 41.3 4.255.6 4,147.7 29.70 L-80 LTC C :e Casing Desorption OD(in) 'ID(In) Top(t9KO) Set Depth(988) Set Depth(TVD)...Wt/Len(I...Grade Top Thread 1 1 PRODUCTION TIE- 51/2 4.892 26.3 1.771.5 1,771.4 17.00 L-80 TC-II BACK CONDUCTOR;43.0-121.0 4 ;Casing Deserlption OD(In) ID(in) Top(kKB) Set Depth(SNB) Set Depth(TVD)...WULen(1...Grade Top Thread PRODUCT)ON 5.5/15"@ 5 1/2 4.766 1,771.5 7.809.4 6,929.5 17.00 L-80 LTC MOD 7044' Tubing Strings Tubing Description String Ma...ID tin) Top MB) Set Depth(ft..Set Depth(TVD)(...WI(16/11) Grade Top Connection PRODUCTION TIE-BACK,26.3- ' TUBING WO 3 1/21 2.9921 25.31 6.930.31 6.251.41 9.201L-80 IIBT-M 1.771.5 Completion Details TBG STOP.1.949.7 INON Nominal ID WHOP.1.950.7 ,4 I Top(kKB) Top(TVD)(MOB) Top 10011°) Item Des Com lin) NIPPLE:1.950.7 �C t 25.3 25.3 0.01 HANGER FMC GEN IV TUBING HANGER 3.500 11 11,950.7 1,950.7 0.79 NIPPLE CAMCO BP-6I LANDING NIPPLE 2.812 6,894.9 6,225.5 43.19 NIPPLE HES X NIPPLE 2.812 6,918.1 6,242.5 43.06 LOCATOR BAKER LOCATOR SUB 3,000 GAS LIFT.2.629.7 ILA 6,919.0 6,243.2 43.05 SEAL ASSY BAKER GBH-22 SEAL ASSEMBLY 3.000 Tubing Description (String Ma,..1 ID(In) 1Top(6KB) 1 Set Depth(k..1 Set Depth(1VD))...IWt(Ib/k) Grade I Top Connection SEAL ASSY 3 112 2.992 6.920.0 7.046.6 6,337.2 9.30 L-80 EUEBR0 Completion Details Nominal ID Top(rtKB) Top(TVD)(kKB) Top Ind(*) Item Des Corn (In) 6,920.0 6,243.9 43.04 PBR BAKER POLISHED BORE RECEPTACLE 3.000 GAS LIFT,4.223.6illt! 6,933.3 6,253.6 42.95 SEAL ASSY KBH-22 ANCHOR SEAL ASSEMBLY 3.000 6,253.9 42.95 PACKER BAKER FA-1 45A36 PACKER 3.020 7,034.0 6,327.8 42.24 LOCATOR BAKER LOCATOR 2.990 7,034.8 6,328.4 42.23 SEAL ASSY BAKER GBH-22 SEAL ASSEMBLY W/O SEALS - 2990 SURFACE;413-4255.6 4 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(TVD) Top Incl I6,933.7 Top(fWKB) (1160) (°) Des Com Run Date ID(In) UGAS FT 5498.0 1,949.7 1,949.6 0.79 TBG STOP 3.5"TUBING STOP 12/5/2015 I I 1.950.7 1.950.6 0.79 WRDP 3.5"WRDP(S/N:C25-0318)ON 2.81"B-7 LOCK 12/5/2015 1.520 (OAL=65") Perforations&Slots GAS LIFT.6 335 6 e Shot I 1 Dens Top(TVD) Bim(TVD) (shotaR Top(11K6) Bim(MB) Top (kKB) Zone Date t) Type Corn 7,131.0 7,161.0 6,400.2 6,422.7 C-4,C3,18- 11/5/1994 6.0 RPERF 21/8"Enerjet,90 deg 18 phase,45 deg GAS LIF1.6 862 3 orientation 7,166.0, 7.176.0 6,426.5 6,434.0 C-2,tB-18 11/5/1994 6.0 RPERF 21/8"Enerjet,90 deg phase,45 deg orientation NIPPLE.6,894.9 ar a� 7,182.0 7.194.0 6,438.5 6,447.6 C-2.1B-18 11/5/1994 6.0 RPERF 2 1/8"Enerjet.90 deg phase,45 deg orientation LOCATOR:6816.1 1 7.246.0 7.273.0 6,486.9 6,507.4 C-1.1B-18 2/4/1995 6.0 RPERF 2 1/8"Enerjet.90 deg phase,45 deg r SELL ASSY;6,818.0 47-7= j orientation PBR;6,920.0 2256.0 7.539.0 6,494.5 6,712.8 A-4,10-18 6/9/1994 4.0 (PERF 3 3/8"HSD CSG guns. SEAL ASSY;6,9313 (-- Oriented t ilk 1 7.548.0 7.575.0 6.719.9 6,741.2 A.4,18-18 6/9/1994 4.0 IPERF 3 3/8"HSD CSG guns, PACKER.6.933.6 r Oriented i Cement Squeezes Top(TVD) etc(TVD( -- Top(008) Blot(11148) ((MB) (kKB) Des l Start Date Com 263 1.771.5 26.3 1,771.4 CSG CMT 8/8/2012 PRODUCTION TIEBACK CEMENT LOCATOR,7.034.0 Lam• Mandrel Inserts SEAL ASSY;7,034.8 • ' St - Top(TVD) Valve Latch Port Size TRO Run N Top(kKB) (kKB) Make Modal OD(in) Sem Type Type (In) (psi) Run Date Com 1 2,629.7 2,629.6 CAMCO KBG-2- 1 GAS LIFT GLV INT 0.156 1,246.0 9/3/2012 9 2 4,223.6 4,120.9 CAMCO KBG-2- 1 GAS LIFT GLV INT 0.156 1,249.0 9/2/2012 RPERF;7,131.0-7.161.0 9 3 5,498.0 5,120.9 CAMCO KBG-2- 1 GAS LIFT GLV INT 0.188 1.283.0 9/2/2012 - 9 RPERF:7.166.07,176.0 4 6,335.6 5,805.5 CAMCO KBG-2- I GAS LIFT GLV INT 0.188 1,276.0 9/2/2012 9 RPERF;7,162.07,184.0 5 6,862.3 6,201.8 CAMCO KBG-2- 1 GAS LIFT OV INT 0.250 0.0 9/2/2012 • 9 Notes:General&Safety End Date Annotation RPERF;7,216.0 _ _7.273.0 8/912010 NOTE:View Schematic w/Alaska Schematic9.0 IPERF:7,256.07.539.0 1PERF;7,548.0-7,575.0 I PRODUCTION 5.5545"8 7044'; 1.752.6-7.809.4 ♦ • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist in the upper left corner of Form 10-403 is checked. If the"Abandon"or / "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work)the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query in RBDMS to ensure that all of the Plug for Redrill wells have been Geologist handled properly. At this same time, they will also review the list of suspended wells for accuracy. ../......./S." • • oei cu o a) a.) ,..4., , cf) co 0.) (r 0 4 (4): .. i..) aj CD X CO a. - c 05 '5 0 o Cal k... ill _C _ C .1- a- C`.1 ,_ 0 ft Cr (13 0 CO W.7 uj _Y CU E • 0 , ,..... c •- 0 cv Z a wc 2 0 -6 75 0•••-wz -1 0 CO CD -, 03 >. CL < <7- -, (1) t .'i , ,..., cv cz .. _ , c C c a, E 4- co *c , IL , , .- 0 -- 0Q) C0 > < N CNI C as CD 0 0 -0 E 0 >. c.) U w (...) .1--, 2 .. . 4-- co = OS 01 cd w —J —I C s— +-. ‘— s— CL >- .--• F— LI LI 7. UE Li) 0 '6_ 2 0 CU 4-, CO C - vs = ... .,..-+ E 11) a) ° "- 0 ( CD 10:2) 1C1.1/ . = ..WC CIC1)-) Lt2 0 pa P s•—• z 52 .:i; Ci. It » C 'LC G 0 11 R c ro 0 a) CC) 0 742. s' tj IX tx tr) w w L.LJ N4 E L. c:) Z E-, 0 $.). = ••• 1.4 U CD CO ii Ca tv Z w0 I— P Z i< C9) tell ig til w cu ILI LL ?_4 LU > > a) 2 e‘ E 4 ..0 < E z = 0 0 C:1 CI CL W w < < ,..., c 4-. Cs1D >- 0- iyi in r., U *MO c c LU 4.1 0 0 f,' cci,' CD 770 u 0 0 LLJ (...) C-) VI LS C CO gr x a c S CO 00 v) N. 4:,t Cr N On E v) o N N in N 4 On 6 00 I. 7,- 0 cn I. 8 8 in cCI 0 a) CO c t. 0 as ce 0-1 CLI r0 Q, 01 E u -5 ()_, Cr% al W CC C C co w he < • c° To a) z a_ ...-. E z (1) no .-I & '-'' C .N' Ca vl .--1 u CD c U ro & XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED Logs of various kinds [] Other COMMENTS: · scanned by: Bevedy Dianna~~athan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: ~si STATE OF ALASKA RECEIVED • ALP, OIL AND GAS CONSERVATION COMMON `_ 9. 4 2O REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon r Repair well 170 Plug Perforations f Perforate r C C Alter Casing J Pull Tubing 1 Stimulate - Frac f Waiver r Time Extension r Change Approved Ftogram r Operat. Shutdow n r Stimulate - Other f Re -enter Suspended Well r 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development r Exploratory r 194 - 061 3. Address: 6. API Number: Stratigraphic r Service " P. O. Box 100360, Anchorage, Alaska 99510 50 029 - 22472 - 00 7. Property Designation (Lease Number): 8. Well Name and Number: _ ADL 25648 1B-18 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): .. none Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 7824 feet Plugs (measured) None true vertical 6941 feet Junk (measured) 26 Effective Depth measured 7722 feet Packer (measured) 6934 true vertical 6858 feet (true vertucal) 6254 Casing Length Size MD TVD Burst Collapse CONDUCTOR 78 16 121 121 SURFACE 4214 7.625 4256 4148 PRODUCTION 7775 5.5 x 5 7809 6930 TIE -BACK 1746 5.5 1772 1771 S C S E J P 2 8 ZIJIa Perforation depth: Measured depth: 7131 -7161, 7166 -7176, 7182 -7194, 7246 -7539, 7548 -7575 True Vertical Depth: 6402 -6426, 6429 -6437, 6441 -6450, 6488 -6711, 6718 -6740 Tubing (size, grade, MD, and TVD) 3.5, L -80, 6920 MD, 6244 TVD Packers & SSSV (type, MD, and TVD) PACKER - FA -1 PACKER @ 6934 MD and 6254 TVD NIPPLE - CAMCO BP -6 LANDING NIPPLE @ 1940 MD and 1940 TVD 12. Stimulation or cement squeeze summary: Intervals treated (measured): not applicable Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil - Bbl Gas - Mcf Water - Bbl Casing Pressure Tubing Pressure Prior to well operation shut - Subsequent to operation 68 190 1815 -- 135 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run Exploratory r Development ° Service r Stratigraphic r 16. Well Status after work: Oil' Gas > WDSPL r Daily Report of Well Operations XXX GSTOR r WINJ r WAG r GINJ SUSP `" SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 312 -246 Contact Ian Toomey (a, 263 -4773 Printed Name Ian Toomey Title Wells Engineer Signature __ Phone: 263-4773 i Date 9 - /y - /,Z S 1Z P G 1 Form 10 4 ® Is 1 t /0� OR\ � ' �� al Oy nl J KU P 1 1 B -18 ` rte. ConocoPhillips " Well Attributes Max Angle & MD TD Alaska, Inc , .r.: , .. Wellbore API/UWI Field Name Well Status Inc! ( °) MD (ftKB) Act Btm(1816B) "„ 500292247200 KUPARUK RIVER UNIT PROD 43.20 6,897.51 7,824.0 Comment H2S (ppm) Date Annotation End Date KB (ft) Rig Release Date °' SSSV: WRDP 150 9/26/2011 Last WO: 8/21/2012 40.81 4/30/1994 Well Goalie - 113-18, 9/8/2012 12:29:23 PM schematic - Actual Annotation Depth (ftKB) End Date Annotation Last Mod ... End Date Last Tag: SLM 7,485.0 9/3/2012 Rev Reason: ADD CEMENT ninam 9/8/2012 Casing Strings HANGER, 15 � tom- Casing Description String 0... String ID ... Top (ftKB) Set Depth (1... Set Depth (TVD) ... String Wt... String ... String Top Thrd CONDUCTOR 16 15.063 43.0 121.0 121.0 62.50 H WELDED I Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd SURFACE 75/8 6.875 41.3 4,255.6 4,147.6 29.70 L - 80 LTC Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd TIE - BACK 51/2 4.892 26.3 1,771.5 1,771.4 17.00 L - 80 TC J91 ; ' ; IF Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd PRODUCTION 5 1/2 4.766 34.7 7,809.4 6,929.5 17.00 L -80 LTC MOD 5 5 "x5" @ 7044' Tubing Strings CONDUCTOR, Tubing Description String 0... String ID ... Top (ftKB) Set Depth (1... Set Depth (TVD) ... String Wt... String ... String Top Thrd 43 TUBING 31/2 2.992 15.0 6,920.0 6,243.9 9.20 L - 80 IBT - M CEMENT, 28 Completion Details t Top Depth (TVD) Top Intl Noml... CEMENT, 28 Top (ftKB) (ftKB) (') Item Description Comment - ID (in) TIE - BACK, 15.0 15.0 - 0.11 HANGER FMC GEN IV TUBING HANGER 3.500 261,772 TBG STOP, `� 1,940.4 1,940.3 0.87 NIPPLE CAMCO BP LANDING NIPPLE 2.812 1,939 WRDP, 1,94 6,884.6 6218.0 43.29 NIPPLE HES X NIPPLE 2.812 0 , NIPPLE, 1,940 ' �, ' ■ 6,907.7 6,234.9 43.13 LOCATOR BAKER LOCATOR SUB 3.000 6,908.7 6,235.6 43.12 SEAL ASSY BAKER GBH -22 SEAL ASSEMBLY 3.000 Tubing Description String 0... 'String ID ... Top (MB) Set Depth (f... Depth (TVD) ... String Wt... ing ... String Top Thrd SEAL ASSY 1 3 1/2 Str 2.992 I 6,920.0 I 7,046.6 I Set D 6,338.0 I 9.30 I Str I -80 I EUE8RD "s .26 19 Completion Details 6 Top Depth (TVD) Top Incl Nomi... T (ftKB) (ftKB) ( ") Item Description Comment ID (In) 6,920.0 6,243.9 43.04 PBR 2.850 6,933.3 6,253.6 42.95 SEAL ASSY ANCHOR SEAL ASSEMBLY 2.850 6,933.7 6,253.9 42.95 FA- 145A36PACKER 3.020 OAS LIFT. 6,936.9 6,256.3' 42.92 XO Reducing CROSSOVER 4.5" x 3.5" 1500 4,213 7,034.0 6,328.5 42.24 LOCATOR BAKER LOCATOR 2.990 7,034.8 6,329.1 42.23 SEAL ASSY GBH -22 SEAL ASSEMBLY W/O SEALS 2.990 SURFACE, J 1 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) 41 -4,258 Top Depth _ (TVD) Top Incl Top (fIKB) (ftKB) (") Description Comment Run Date ID (in) GAS LIFT, 26 26.3 -0.10 CEMENT PUMP 8.5 BBLS CEMENT, TOC JUST BELOW THE OA 8/8/2012 4.892 5.488 VALVE 1,939 1,938.9 0.87 TBG STOP 3.5" TUBING STOP 9/3/2012 II 1,940 1,940.3 0.87 WRDP 2.812" B -7 LOCK & 3.5" WRDP (S /N: HCS -49, OAL =65 ") 9/3/2012 1.520 amn GAS .1 T. __ _ Perforations & Slots 65 = I Top (ND) Btm (TV Shot D) Dens Top (ftKB) Bbn (ftKB) (ftKB) (ftKB) Zone Date (ah.. Type Comment 7,131 7,161 6,4022 6,425.7 C-4, C-3, 18-18 11/5✓1994 6.0 RPERF 218" Enerjet, 90 deg phase, 45 deg orientation GAS LIFT, 6,852 7,166 7,176 6,429.4 6,436.7 C -2, 16-18 11/5/1994 6.0 RPERF 21/8" Enerjet, 90 deg phase, 45 deg - orientation 7,182 7,194 6,441.1 6,449.9 C -2, 1B -18 11/5/1994 6.0 RPERF 21/8" Enerjet, 90 deg phase, 45 deg NIPPLE, 8,885 - orientation lit 7,246 7,273 6,488.3 6,508.4 C 113 2/4/1995 6.0 RPERF 2 1/8" Enerjet, 90 deg phase, 45 deg LOCATOR, =IF orientation 8,908 SEAL ASSY, t - 7,256 7,539 6,495.8 6,710.7 A -4, 16-18 6/9/1994 4.0 !PERE 33/8" HSD CSG guns, Oriented 6,909 7,548 7,575 6,718.0 6,739.9 A-4, 16-18 6/9/1994 4.0 IPERF 3 3/8" HSD CSG guns, Oriented PBR, 8,920 MI SEAL ASSY, 8,933 ;�; Notes: General & Safety End Date Annotation PACKER, 6,934 ,""=" 8/9/2010 ( NOTE: View Schematic w/ Alaska Schematic9.0 I LOCATOR, 7,034 SEAL ASSY. 7,035 RPERF, 7.131 - 7,181= RPERF, 7,188 -7,178 _.. Mandrel Details Top Depth Top Port RPERF, (TVD) Intl OD Valve Latch Stze TRO Run 7,182.7,194 Stn Top (ftKB), (ftKB) ( ") Make Model (in) Sew Type Type On) (psi) Run Date Com... 1 2,619.4 2,619.2 1.19 CAMCO KBG-2 -9 1 GAS LIFT GLV INT 0.156 1,246.0 9/3/2012 2 4,213.3 4,112.3 33.46 CAMCO KBG -2 -9 1 GAS LIFT GLV INT 0.156 1,249.0 9/2/2012 7,246.7273 3 5,487.6 5,118.0 43.18 CAMCO KBG-2 -9 1 GAS LIFT GLV INT 0.188 1,283.0 9/2/2012 IPERF = 4 6,325.3 5,797.3 38.68 CAMCO KBG -2 -9 1 GAS LIFT GLV INT 0.188 1,276.0 9/2/2012 7,258 - 7,539 5 6,852.0 6,194.4 43.52 CAMCO KBG-2 -9 1 GAS LIFT OV INT 0.250 0.0 9/2/2012 PERF, 7,548-7,575 PRODUCTION 55'x5 " 7044'. 1.753 -] 809 TD. 7.824 1I410Workover Summary • DATE SUMMARY 6/26/12 (PRE RWO) : POT -T PASSED, PPPOT -T PASSED, POT -IC PASSED, PPPOT -IC PASSED, FUNCTIONED TESTED LDS'S (ALL GOOD). 7/10/12 PULLED TBG STOP @ 1911' RKB, PULLED WRDP @ 1912' RKB. BRUSHED & GAUGED TBG TO D NIPPLE @ 7040' RKB. IN PROGRESS. 7/11/12 SET CATCHER @ 7040' RKB. PULLED DV @ 6997' RKB (POCKET OPEN). PULLED OV @ 5633' & GLV @ 4236' RKB; SET DVs @ SAME. IN PROGRESS. 7/12/12 PULLED GLV @ 2523' RKB, SET DV @ SAME. PULLED CAT SV @ 7040' RKB. READY TO DISPLACE WELL. 7/21/12 Displace & Freeze - Protect Well. Complete. 7/30/12 Rig down, blow down and disconnect service lines. Split modules apart and prep to move. 7/31/12 Move rig off 3F -13A. Move rig f/ 3F -13A t/ 1 B -18. Spot sub and modules. Rig up, rig accepted @ 20:00 hours. Take on 580 bbls of seawater. Rig up to circulate well. 8/1/12 Attempt to circulate diesel and inhibited brine out of wellbore. Pumped 170 bbls w/ 26 bbls returned. Bullhead 1 -1/2 times annular and tubing volume. Set BPV, N/D tree and N/U BOPE. Test BOPE t/ 250/3000 PSI, Jeff Jones waived witness of test. Make landing joint up and attempt to pull hanger. Pulled 150K and 160K, hanger would not pull. Call E -Line to make RCT cut. Lost a total of 666 bbls of seawater in 24 hrs. 8/1/12 PERFORMED TUBING CUT MID -JOINT ABOVE LOWEST GLM AT 6980' USING AN RCT - 1688 -200 WITH EMA. TUBING CUT VERIFIED BY DOYON 141. 8/2/12 RIH w/ RCT, attempt to cut @ 7006' MD. Pull 160K on tubing, hanger would not pull free. RIH w/ RCT and cut tubing @ 6980' MD. Pull hanger to rig floor, hanger pulled free @ 87K. L/D 6921' 3 -1/2" tubing. Left 5 SS bands in hole. Test lower pipe rams w/ 3 -1/2" test joint. P/U BHA # 1 , 5 -1/2" casing scraper and RIH. 8/3/12 RIH w/ scraper t/ 6864' MD. Spot HiVis pill and POOH. R/U HES E -Line and RIH w/ RBP on E -Line. Unable to get past 3130' MD after two attempts. Rig down E -Line. RIH w/ Baker RC jet basket, break circulation at 2346', 4689' and 6963'. Spot HiVis pill and POOH> 8/3/12 ATTEMPTED TO SET BAKER HUGHES 45A4 RBP AT 6880. RAN INTO OBSTRUCTION AT 3100. POOH FOR CLEAN OUT TRIP. 8/4/12 POOH w/ RC junk basket, recovered two SS bands. M/U RBP on 3 -1/2" PH6 and RIH. Set RBP @ 6940' MD and test to 3000 PSI. POOH and R/U E -Line. Run cement bond log on E- Lirie. TOC @ 1900' MO w/ stringers up t/ —1825' MD. RIH on E -Line and shoot string shot Cad 1770' MD. 8/4/12 RIG IN HOLE WITH CAST M CEMENT BOND LOGGING TOOLS AND LOG FROM 6900' ABOVE PLUG TO SURFACE / RIG IN HOLE AND SHOOT A SHOT ROD ACROSS THE COLLAR AT 1770' / RIG BACK IN HOLE WITH BAKER WIRELINE RETRIEVABLE PLUG AND SET AT 2400' / TOP OF CEMENT WAS EST. @ 1900' 8/5/12 Make string shot w/ E -Line @ 1770' MD. Set RBP on E -Line @ 2400' MD. RIH on PH6 pipe and dump 30' of sand on top of RBP. Nipple down and remove tubing head, pull 50K on casing and re -set slips. N/U BOPE. RIH and cut 5 -1/2" casing @ 1751' MD. POOH. 8/6/12 Circualted out arctic pack w/ warm diesel and seawater. N/D BOPE and pull emergency slips. N/U BOPE and lay down 1746.58' of 5 -1/2 "casing. Perform full weekly test to 250 PSI /3000 PSI. M/U clean out BHA and RIH. Tagged up on something @ 773' MD. Work past tight spot and cont. t/ RIH. 8/7/12 Continue RIH w/ casing scraper t/ 1715' tag casing stub, Circ. 170 bbls heated sea water @ 210 gpm 160 psi, observe well for flow static, POOH M/U spear, RIH t/ 1757' engauge dutchman back off free in 15 turns, circ. shakers clean, POOH L/D spear & dutchman, I/d 4" dp 54 jts, R/U casing equip, Run 5.5 TC2 T, 1771' M/U jt 17 turns, torque up, R/U cement head & lines, r�essure test casing t/ 2500 psi f/ 5 min, open ES cementer t/ 3600 psi, flush casing w/ 100 bbls heated sea water, pump cement, lost returns through bleeder when rams were shut, no cement to surface, bump plug @ 360 stks, pressure up t/ 2325 psi t/ close ES cementer hold pressure f/ 5 min. Wait on cement Rig up for top job. 8/8/12 R/U & perform top job, pump 8.5 bbls, flush lines rig down, set slips cut casing, Nipple down stack & drilling spool, install pa test t/ 3000 f/ 10 min., nipple up tubing 1 & stack, R/U test equip. test breaks on sand tubing head t/ 250 low 3000 high, fu on test all rams, set wear ring M/U drillout BHA, RIH t/ 1695 test casing t/ 3000 psi f/ 10 min. drill HES cementer & plug, 5- 15 wob, 80 rpm 1600 tq, 84 gpm 225 psi, RIH t/ 2368' 8/9/12 Test casing t/ 3000 psi f/ 10 min, grind on junk t/ 2373', POOH L/D BHA, P/U BHA Rev. Circ. Junk Basket, RIH t/ 2373', POOH, clean baskets, M/U Junk Mill, RIH mill junk t/ 2379', POOH UD BHA, P/U REV. Basket, Wash t/ 2382' POOH 8/10/12 Milling on junk, reverse junk basket run, retrieve RBP _ @2400' POOH M/U 2nd retrieval tool RIH t/ 6085' 8/11/12 RIH t/ 6936' pull RBP, Loss rate of 100 BPH, Spot Hi Vis pill on bottom losses slowed t/ 70 BPH, POOH, RIH, Cut & Slip drill line, Latch dutchman, Jarring operations, no movement, POOH 8/12/12 Pooh & L/D Overshot, RIH open ended t/ 6924', R/U wireline, R/U Eline, RIH w/ RCT <Attempt cut @ 7044' POOH w/ Eline R/D POOH w/ Work string, M/U Overshot RIH Attempt t/ pull fish, engage fish, still stuck, fire jars unable to pull free 8/12/12 PERFORMED TUBING CUT AT 7043.6' USING RCT- 2000 -200 DEPLOYED WITH EMA ANCHOR. HOLE FILL SHUT OFF FOR 15 MINUTES PRIOR TO FIRING CUTTER TO ALLOW FLUID LEVEL TO STABILIZE. RIG TO VERIFY TUBING CUT. 8/13/12 Continue jarring on fish @ 6965', No success, release from fish, POOH, R/U & test bop 250 low 3000 high, P/U wash pipe BHA, t/ 6963', Slack off t/ 6981' w/ rotary take 5k weight. 8/14/12 R/U Eline & RIH w/ IBP t/ 6965' unable to get down, POOH, RIH w/ RCT Cutter t/ 7043' Make cut, POOH, R/D Eline, POOH w/ Wash pipe 8/14/12 ATTEMPT TO RUN BAKER 2 -1/8" IBP, UNABLE TO WORK IBP PAST TUBING STUB AT 6958'. POOH. RAN RCT 2000 -200 W/ EMA ANCHORS. CUT TUBING AT 7043.6', CORRELATED TO 12 AUG 2012 TUBING CUT. POOH AND RIG DOWN. 8/15/12 RIH w/ overshot engage fish, jar free, POOH, lay down 63' of fish RIH w/ wash pipe wash over tubing stub, POOH, 8/15/12 Stand -by for rig. Verified tubing cut was successful. De -mob equip. 8/16/12 M/U Overshot RIH 7026' engage fish, POOH, L/D BHA + fish, Run 3.5 completion as per detail. 8/17/12 RIH w/ 3.5 completion, tag up on @ 7047' static losses continued, attepmt to engage PBR w/ seals taking weight, set 20K on locator seals not holding, POOH L/D jewelry and rack back tubing, RIH w/ packer and seal assembly, tag locator @ 7047' set packer, cut & slip drill line 8/18/12 Pooh w/ packer running tool, R/U & RIH w/ 3.5 completion t/ 1733' PBR hanging up in HES cementer, POOH w/ 3.5 completion, ship tools to baker for machine work, RIH w/ Rev. Junk Basket t/ 6933', POOH 3 quater size peices of junk, R/U & run 3.5 completion t/ 1875' 8/19/12 Run completion t/ 6933' set & shear anchor, circ. inhibited sea water, space out, attempt t/ test IA, test failed unable to hold pressure, POOH, inspect seals no damage, 5 SS bands lost in hole 4 recoverd in wellhead. RIH w/ rev circ basket. 8/20/12 Contiune RIH w/ reverse circ. baskett/ 6919', POOH, UD BHA, RIH w/ test packer testing casing @ 1737', 2432', 6933' all test good, POOH w/ packer, RIH w/ 3.5 completion testing GLM's, SOV leaking, RIH w/ 3.5 completion, space out. 8/21/12 Space & land tubing on hanger, test casing t/ 3000 psi f/ 30 min. displace well w/ 140 bbls inhibited sea water, install BPV test in direction of flow t/ 500 psi, Clean cement out of BOP cavities, Nipple down bop nipple up tree & test, freeze protect well, UD drill pipe 8/22/12 Conitnue UD 3.5 dp, rig released @ 0500 hrs move rig t/ 1J pad for maintenance 9/2/12 PULLED 2.812" ISO SLEEVE @ 1940' RKB, SET 3" PULLING TOOL CATCHER SUB ASSEMBLY ON BALL & ROD @ 6870' SLM, PULL 1" SOV @ 6852' RKB VLV WAS SHEARD, SET OV @ SAME, PULLED DV's @ 6325' , 5488' & 4213' RKB, INSTALLED NEW LGLV's @ SAME. IN PROGRESS. 9/3/12 PULLED 1" DV @ 2619' RKB, SET 1" LGLV @ SAME. MIT TBG 2500 PSI PASS, BAILED SCALE FROM CATCHER ASSEMBLY @ 6870' SLM, PULLED CATCHER SUB & BALL & ROD @ SAME, PULLED 2.81 RHC PLUG BODY @ 6884' RKB, TAGGED BOTTOM @ 7485' SLM / 7491' RKB, MEASURED BHP @ 7444' SLM: 2643 PSI. SET 2.81 B -7 LOCK & 3 1/2 WRDP -1 @ 1940' RKB (S /N:HCS -49), SET 3 1/2 TBG STOP ON TOP WRDP @ 1940' RKB. GOOD CLOSURE TEST. COMPLETE. • zt`rZc WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 15, 2012 Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Tubing Cut Record: 1B -18 Run Date: 8/14/2012 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Klinton Wood, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1B -18 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50- 029 - 22472 -00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 klinton.wood@halliburton.com l� Date: 0 I \flt+2. Signed: aha �.1�� • 9 o c t WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 10, 2012 Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Tubing Cut Record: 1B -18 Run Date: 8/2/2012 The technical data listed below is bein g submitted herewith. Please address any problems or concerns to the attention of: Klinton Wood, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1B -18 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50- 029 - 22472 -00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 klinton.wood@halliburton.com Date: \ 0 7v2--/ �2 Signed: 71/611/4---- WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 6, 2012 Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Circumferential Acoustic Scanning Tool /Plug Setting Record: 1B -18 Run Date: 8/4/2012 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Klinton Wood, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1B -18 Data in LAS /DLIS format, Digital Log Image files 1 CD Rom 50- 029 - 22472 -00 CASE Log 1 Color Log 50- 029 - 22472 -00 �' ::cY�tz is 7 p ' U1: ACE Log 1 Color Log 50- 029 - 22472 -00 CAST -M Field print 1 Color Log 50- 029 - 22472 -00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Klinton Wood 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 klinton.wood @halliburton.com Date: \ l V 2 Signed: )4/ • • s SEAN PARNELL, GOVERNOR ALASKA OIL AND G A.S 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Ian Toomey Wells Engineer (1 o (e f ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, 1B -18 Sundry Number: 312 -246 Dear Mr. Toomey: ' JUL 281 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, at y P Foe ter Chair DATED this I 10 day of July, 2012. Encl. r i • • ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510 -0360 R a.D July 3, 2012 L C A) 0 5 2012 Commissioner Dan Seamount State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7 Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner Seamount: ConocoPhillips Alaska, Inc. hereby applies for an Application for Sundry Approval to workover the Kuparuk Well 1B-18 (PTD 194 -061). Well 1B-18 was drilled in April 1994 and completed as an A &C sand single completion producer in June 1994. It produced continually until 2000 when it was shut in for high water cut and flood management. When it was brought back on line in 2002 the water cut was much lower. It produced from 2002 until 4/23/11 when the well failed an MIT -OA. Diagnostic casing tests, indicate a leak in the 7 -5/8" surface casing at 99 feet. On 11/1/11 the well passed a CMIT -TxIA and on 11/2/11 the well passed a MIT -T. The well was then tested to see if it could produce with out lift gas, but was unable to flow fluids to surface. The surface casing leak is too deep to • remediate from the surface and requires a RWO to repair. The proposed workover is to pull the existing tubing, cut & pull the 5 -1/2" casing above the TOC • in the 5 -1/2" x 7 -5/8" annulus, re- install new 5 -1/2" casing and circulate cement into the 5 -1/2" x 7- 5/8" annulus; which will ultimately plug the leak in the 7 -5/8" casing. Then run a new 3 -1/2" gas lift completion. If you have any questions or require any further information, please contact me at 263 -4773. Sincerely, / Ian o• Wells Engineer CPAI Drilling and Wells ' ' STATE OF ALASKA rte,,, A AL OIL AND GAS CONSERVATION COM T� b , t APPLICATION FOR SUNDRY APPROVALS 4' 20 AAC 25.280 1. Type of Request: Abandon r Flug for Redrill r Perforate New Pool r Repair well rv"; - Change Approved Program r Suspend r Plug Perforations r Perforate r Pull Tubing wi - Time Extension r Operational Shutdow n r Re -enter Susp. Well f Stimulate Alter casing g r4.7 Other: r 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development i✓ 4 Exploratory r 194 - 061 • 3. Address: Stratigraphic r Service 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50 029 - 22472 - 00 • 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line 8. Well Name and Number: where ownership or landownership changes: Spacing Exception Required? Yes r No 17 1B-18 9. Property Designation (Lease Number): 10. Field / Pool(s): ADL 25648 ' Kuparuk River Field / Kuparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 7824 ` 6941 . 7722' 6858' Casing Length Size MD TVD Burst Collapse CONDUCTOR 78 16 121' 121' SURFACE 4214 7.625 4256' 4148' RECEIVED PRODUCTION 7775 5.5 x 5 7809' 6930' JUL fl `fl Perforation Depth MD ( 7131 - 7161, 7166 - 7176, Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 7182 - 7194, 7246 - 7539, 7548 - 7575 6402 - 6426, 6429 - 6437, 6441 - 6450, 6488 - 6711, 6718 - 6740 3.5 x 2.875 L -80 7062 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft) no Packer SSSV - CAMCO BP -61 HYD LANDING NIPPLE TD =1912 TVD =1912 12. Attachments: Description Summary of Proposal izi 13. Well Class after proposed work: Detailed Operations Program r BOP Sketch Exploratory Development Service r 14. Estimated Date for Commencing Operations: 15. Well Status after proposed work: 8/1/2012 Oil f• • Gas r WDSPL r Suspended fl 16. Verbal Approval: Date: WINJ r GINJ r WAG r Abandoned r Commission Representative: GSTOR r SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ian Toomey @ 263 -4773 Printed Name Ian Toomey Title: Wells Engineer Signature --i- Phone: 263 -4773 Date 7 -3 - /2 Commission Use Only Sundry Number M lAi i Conditions of approval: Notify Commiss ion so that a representative may witness / U / '� Plug Integrity r BOP Test V Mechanical Integrity Test r Location Clearance r r Other: /J //�� ( P t 6 r t2 3 0 d� l7 5 c Subsequent Form Required: x '67 ,_. APPROVED BY // Approved by: COMMISSIONER THE COMMISSION Date: 7- b -/ Z - R 1 61N : DMS J UL 172 %� 0 - ' Form 10 -403 Revised 1/2010 � �u•�. i n Dup licate � - ,,E t/ 2f ( � .�� • • 1B-18 Capital Rig Workover (PTD #: 194 -061) Current Status 1B-18 is currently shut -in awaiting a workover. The well failed an MIT -OA on 4/23/11. Diagnostic casing tests indicate a leak in the 7 -5/8" surface casing at 99 feet. On 11/1/11 the well passed a CMIT -TxIA and on 11/2/11 the well passed a MIT -T. The well was then tested to see if it could produce with out lift gas, but was unable to flow fluids to surface. The surface casing leak is too deep to remediate from the surface Scope of Work Pull the existing tubing, cut & pull the 5 -1/2" casing above the TOC in the 5 -1/2" x 7 -5/8" annulus, re- install new 5 -1/2" casing and circulate cement into the 5 -1/2" x 7 -5/8" annulus; which will ultimately plug the leak in the 7 -5/8" casing. Then run a new 3 -1/2" gas lift completion. General Well info MASP: 1957 psi (utilizing 0.1 psi /ft gas gradient and SBHP listed below) Reservoir pressure/TVD: 2614 psi at 7350' MD (6566' TVD) SBHP taken on May 14, 2012 7 5 /n- Wellhead type /pressure rating: FMC Gen IV, 11" 3K btm x 7- 1/16" 5K top flange •% G'" BOP configuration: Annular / Pipe Rams / Blind Rams / Mud Cross / Pipe Rams MIT results: CMIT -TxIA - passed on November 1, 2011 MIT -T — passed on November 2, 2011 V MIT -OA - failed on April 23, 2011 ,/ Well Type: Producer Estimated Start Date: August 1, 2012 Production Engineer: Dana Glessner / David Lagerlef Workover Engineer: Ian Toomey (263 - 4773 / lan.A.Toomey@conocophillips.com) Pre -Rig Work Request 1. RU HES slickline a. Dummy off GLM # 1 -3. Pull DV in GLM #4 and leave open. 2. RDMO HES slickline. 3. Displace IA and tbg with 8.6 ppg corrosion inhibited seawater. 4. PT tubing and casing packoffs, FT LDS. � � 5. Set BPV. Proposed Procedure ig ) 1. MIRU Doyon 141. 3 ° t 2. Pull BPV, verify well is dead. If not, reverse circulate 8.6 ppg seawater. Verify well is dead. Set BPV, ND tree, NU 13 -5/8" 5K BOP. Pressure test BOP including annular to 250/3549-psi. t //7 ./ e 3. Pull blanking plug and BPV. Attempt to pull tubing from SBE. , . 2 r eft, ,- 4 ? y hi-, 1/? 4 "t`l ''��`' a. If unable to pull free, set tubing in the slips. b. RU E -line, RIH and cut the tubing in the middle of first full joint above the SBE. 4. POOH laying down tubing. ,/ 5. Run 5 -1/2" scraper assembly to top of tubing stub. Circulate well clean. 6. RU E -Line. Run casing evaluation logs including CBL in the 7" casing. Based on cement top, determine depth of 5 -1/2" collar to back -off following casing cut. RIH and fire string shot across that . , � collar. RD E -Line. �X °� t d" 7. Set RBP #1 above the tubing stub. Pressure test to 2500 psi and drawdown test to 0 psi. • • -- Proposed RWO Procedure Continued- - 8. Set RBP #2 below top of cement. Pressure test to 2500 psi and drawdown test to 0 psi. Dump sand on top of RBP. 9. ND BOP stack, ND tubing head. Spear 5 -1/2" csg and pull in tension and re -land in slips. Cut off 5- 1/2" casing growth. Tack weld slips to casing. 10. NU 13 -5/8" 5M BOP on 11" 3M casing head. (Cannot test break due to leak in the surface casing, BOP stack will be considered a diverter, there are 2 barriers in the well at this point.) 11. Cut 5 -1/2" casing above TOC. Circulate Arctic Pack from the 7 -5/8" x 5 -1/2" annulus with w/ heated diesel followed by heated seawater. 12. Spear 5 -1/2" casing and POOH sideways. 13. Set test plug in the casing head and PT to 250/3000 psi (test pressure limited by 11" 3M casing head). 14. Run 7 -5/8" casing scraper to top of 5 -1/2" stub. Circulate clean. 15. Run back off tool and back off casing stub. 16. Run tandem string mills to gauge the 7 -5/8" csg for the ES cementer. 17. Spear and recover backed off 5 -1/2" casing stub. 18. RIH with new 5 -1/2" casing and Halliburton ES cementer. Screw into top of 5 -1/2" casing. Pressure test casing. 19. Open ES cementer and pump cement into 7 -5/8" x 5 -1/2" annulus to surface (see attached cement detail). Close cementer. 20. WOC. ND BOP, pull casing in tension and land in slips. Cut 5 -1/2" casing, install packoff. NU new tubing head. , p. t✓ 21. NU 13 -5/8" 5M BOP and test break to 250.., .'. � 22. Drill out cement. Pressure test casing to 2500 psi and record on test chart. Continue down until tag up on top of sand, dry drill to break up debris. Circulate well clean. 23. RIH with wash shoe, boot baskets, magnets, etc. and circulate out sand on top of RBP #2. 24. RIH w/ RBP retrieving tool on work string. Release RBP #2 and POOH. 25. RIH w/ RBP retrieving tool on work string. Release RBP #1 and POOH. a. RIH w/ overshot and pull tubing stub from SBE if necessary. 26. RIH with new 3 -1/2" single completion to top of SBE at 7044' RKB. Load the tubing and IA with 8.6 ppg corrosion inhibited seawater. 27. Space out and land the hanger. RILDS. 28. Drop ball and rod. 29. Pressure test tubing and IA to 2500 psi (record on test chart). 30. Bleed IA to 0 psi followed by tbg pressure to 0 psi. Ramp up IA pressure to 2000 psi to shear SOV. Bleed tbg and IA to 0 psi. 31. Set BPV. ND BOP. NU tree, pull BPV, set tree test plug and test. 32. Pull tree test plug. Freeze protect well. Set BPV. 33. Pressure up on the IA to 1000 psi to test the BPV from below. Bleed IA to 0 psi. 34. RDMO Doyon 141. Post -Rig Work request: 1. Pull BPV. 2. RU HES Slickline: a. Pull ball and rod b. Pull SOV from GLM #4 c. Run DV in GLM #4 d. Pull RHC plug body e. Install WRDP and slipstop in BP -61 nipple and function test 3. RDMO HES Slickline. 4. Return well to production. • • 1 B -18 Cementing Plan: Cement the 7 -5/8" x 5 -1/2" annulus above previous TOC in the same annulus. Cement Required: 15.7 ppg ARCTICSET 1 0.93ft /sk Estimated existing TOC is 1800' MD 30 bbl volume 1. Cement pump schedule (exact volumes will be adjusted according to actual TOC): a. 5 bbls freshwater b. 27 bbls neat 15.7 ppg ARCTICSET 1 c. Launch closing plug d. Displace with 3 bbls neat 15.7 ppg ARCTICSET 1 e. 5 bbls freshwater f. XX bbls heated seawater ( -90 °F) to bump plug tom. KU P • 1 B -18 ConOCOf 111��IpS ,t,1,.. : Well Attributes Max Angie & MD TD „ ;° ` '. Wellbore API /UWI Field Name Well Status Inc! (°) MD (1565) Act Btm (ftKB) car „ 500292247200 KUPARUK RIVER UNIT PROD 43.20 6,897.51 7,824.0 oP Comment H2S (ppm) Date Annotation End Date KB-Grd (ft) Rig Release Date "' SSSV: WRDP 150 9/26/2011 Last WO: 40.81 4/30/1994 Well ConeO'. -1 B-18, 511A 1 Annotation De :1329 PM $them8 5 1 -Actual End Date Annotation Last Mod ... End Date - .- /Depth (ftKB) ) Last Tag SLM 7,514.0 5/13/2012 Rev Reason: TAG, RESET WRDP & TBG STOP ninam 5/16/2012 ---- - -- ---- - Casing Strings Casing Description String 0... String ID ... Top (ftKB) Set Depth (T... Set Depth (TVD) ... String Wt... String ... String Top Thrd _ ,? . _ CONDUCTOR 16 15.063 43.0 121.0 121.0 62.50 H WELDED HANGER, 40 Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd ' SURFACE 75/8 6.875 41.3 4255.6 4,147.6 29.70 L LTC / Casing Description String 0... String ID ... Top (ftKB) Set Depth (f... Set Depth (TVD) ... String Wt... String ... String Top Thrd i \ , PRODUCTION 5 1/2 4.766 34.7 7,809.4 6,929.5 17.00 L -80 LTC MOD 5.5 "x5" @ 7044' Tubing Strings Tubing Description Sling 0... String ID ... Top (ftKB) Set Depth (1... Set Depth (TVD)... String Wt... String .. String Top Thrd 1111 TUBING 3.5'x2 875' I 3 1/2 2.992 I 39.7 7,061.5 I 6,349.3 9.20 I L-80 I BTC -MOD Completion Details CONDUCTOR, Top Depth 43-121 (TVD) Top Inc' NOmi... Top (ft65) (ftKB) ( °) Item Description Comment ID (In) SLIPSTOP, 39.7 39.7 - 0.09 HANGER FMC GEN IV HANGER 3.500 1,877 ammir 1,911.9 1,911.8 0.86 NIPPLE CAMCO BP-61 HYD LANDING NIPPLE 2.812 I 7,040.0 6,333.0 42.20 NIPPLE CAMCO D -15 NIPPLE NO GO 2.312 NIPPLE, 1 WRDP, 1,911 ,912 • 7,048.8 6,339.7 42.13 LOCATOR BAKER GBH 22 LOCATOR 3.000 ` " 7,049.7 6,340.3 42.13 SEAL ASSY BAKER SEAL ASSEMBLY 3.000 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top Depth (TVD) Top loci Top (ftKB) (ftKB) (°) Description Comment Run Date ID (in) 1,877 1,876.9 0.84 SLIPSTOP 3.5 TUBING STOP 5/14 /2012 W GAS LIFT, �� , 1,911 1,910.9 0.85 WRDP BAKER BDWE -S (S/N: 659238) 5/14/2012 2,524 r.- =, v Perforations & Slots Shot Top (TVD) Btm (TVD) Dens I Top MKS) Btm (ftKB) (ftKB) (ftKB) Zone Date (ah..• Type Comment 7,131 7,161 6,402.2 6,425.7 C-4, C -3, 1B-18 11/5/1994 6.0 RPERF 21/8" Enerjet, 90 deg phase, 45 deg orientation 7,166 7,176 6,429.4 6,436.7 C -2, 1B-18 11/5/1994 6.0 RPERF 2 1/8" Enerjet, 90 deg phase, 45 deg t orientation GAS LIFT, - s 4,236 - I C 7,182 7,194 6,441.1 6,449.9 C -2, 1B -18 11/5/1994 6.0 RPERF 2 1/8" Enerjet, 90 deg phase, 45 deg orientation I 7, 246 7,273 6,488.3 6,508.4 C -1, 1B -18 2/4/1995 6.0 RPERF 21/8" Enerjet, 90 deg phase, 45 deg SURFACE, • J orientation 41 -4,258 6--7 7,256 7,539 6,495.8 6,710.7 A-4, 1B -18 6/9/1994 4.0 IPERF 33/8" HSD CSG guns, Oriented H 7548 7,575 6,718.0 6,739.9 A -4, 1B -18 6/9/1994 4.0 IPERF 3 3/8" HSD CSG guns, Oriented Notes: General & Safety GAS LIFT, r -J. End Date Annotation 5,633 8/9/2010 NOTE: View Schematic w/ Alaska Schematic9.0 r GAS LIFT, now 6,997 Iti MI NIPPLE, 7,040 -- a LOCATOR, 7,049 SEAL ASSV, 7,050 , ) RPERF, 7,131 -7,161 RPERF, - 7,166 -7,176 RPERF, 7,182-7,194 Mandrel Details Top Depth Top Port (TVD) Inc! OD Valve Latch Size TRO Run Stn Top (ftKB) (ftKB) ( °) Make Model (in) Sery Type Type (in) (psi) Run Date Com... RPERF, 1 2,523.7 2,523.6 1.15 McMu... FMHO 1 GAS LIFT GLV BK 0.125 1,236.0 2/24/2011 7,246 - 7,273 2 4,236.3 4,131.5 33.50 McMu... FMHO 1 GAS LIFT GLV BTM 0.188 1,308.0 3/18/2008 7,256 3 5,633.2 5,225.9 38.44 McMu... FMHO 1 GAS LIFT OV BK 0.250 0.0 11/2/2011 4 6,996.9 6,300.8 42.50 McMu... FMHO 1 GAS LIFT DMY BK 0.000 0.0 11/17/2003 IPERF, 7,548-7,575 I PRODUCTION 5.5'85" 7044', 35 -7,809 TD, 7,824 • 1 • 111P/.. ,Surface Casing Leak —99' MD NNW I . ConocaPhilli S �c Pack •:: E 1 B -18 121' MD, 16" 62.5 #, H -40 ] I I Type H `ES' Cementer Estimated TOC 1800' MD BP -61 Nipple, 2.812" DS profile Cement 4256' MD, 7 -5/8" 29.7 #, L -80 Existing Proposed The completion will be the same just new 3 -1/2" 9.3# L -80 IBTM w /SCC tubing, GLM GLM's and nipples 5 -1/2" 17 #, L -80 ► [] ii 2.813" `X' Nipple - i 7044' MD, SBE • I. r i Seal Assembly • ■ 5" 18 #, L -80 I Perforations I C7 Conoc ~ ' ' oPhi~f~ps Alaska P.O. BOX 100360 ANCHORAGE, AIASKA 99510-0360 August 17, 2008 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 ~ ~~,~~ AUG ~ X008 Dear Mr. Maunder: • RECEI VE® AUK 2 5 2008 Alaska Oi! & Gas Cons, Anchor~ga C°rn''~`~'sior~ tq~ i Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRIS. Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The corrosion inhibitor/sealant was pumped August 2-17, 2008. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Perry Klein at 907-659-7043, if you have any questions. Sincerely, Perry Kle ~ ~ Z ~~1~ ~ ConocoPhillips Well Integrity Projects Supervisor • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) ./ r1a+a Kuparuk Field -- tsl9 /ILUUS Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date 2H-05 185-168 ft SF bbls ft al 2H-17 200-019 6" N/A SF " N/A 5.10 8/2/2007 2K-27 201-169 10" N/A 6 " N/A 1.27 8/2/2007 2M-03 191-141 16" N/A 10 " N!A 8.92 8/2/2007 1 B-14 194-030 SF N/A 16 N/A 2.13 8/2/2007 16-18 1 B-19 194-061 194-064 9" SF N/A N/A SF 9" N/A N/A 1.70 8.07 8/13/2008 8/13/2008 1 B-20 203-115 21" N/A SF " N/A 5.10 8/13/2008 1 B-101 203-133 3" N/A 21 " N/A 5.95 8/13/2008 1 B-102 203-122 4" N/A 3 " N/A 1.00 8/17/2008 1Y-05 183-087 6" N/A 4 " N/A 1.00 8/17/2008 1Y-07 183-068 6" N/A 6 " N/A 1.27 8/13/2008 1Y-17 1Y-22 1Y-26a 193-068 193-070 188-116 SF SF SF N/A N/A N/A 6 SF SF N/A N/A N/A 1.27 1.27 2.12 8/13/2008 8/13/2008 8/13/2008 1Y-30 188-090 SF N/A SF N/A 3.83 8/13/2008 1 E-112 204-091 14" N/A SF " N/A 3.83 8/13/2008 1 E-119 1 E-121 1 E-123 204-031 204-246 204-074 14" 6" 5" N/A NIA N/A 14 14" 6" " N/A N/A N/A 5.95 4.67 1.00 8/17/2008 8/17/2008 8!17/2008 N/A 5 N/A 1.00 8/1712008 07/24/06 SchlmBbepglP NO. 3887 Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 A TTN: Beth !,-.: ,r. 3CAN!it.~ Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 I Cf4 -00/ Field: Kuparuk Well Job# Log Description Date BL Color CD ,,,",,\vI -:-) 1 E-1 92 11211600 INJECTION PROFILE 06/23/06 1 1Y-12 (REVISED) 11235362 INJECTION PROFILE OS/20/06 1 1E-HI5L1 11213766 INJECTION PROFILE 06/20/06 1 1B-18 N/A PRODUCTION LOG W/DEFT 06/25/06 1 1J-164 11213765 INJECTION PROFILE 06/19/06 1 1 C-25 1102601 SCMT 06/24/06 1 3M-22 11213770 PRODUCTION PROFILE W/DEFT 06/26/06 1 2M-12 11213771 PRODUCTION PROFILE W/DEFT 06/27/06 1 1Q-12 11285929 MEMORY INJECTION PROFILE 06/24/06 1 1Y-07 11285928 MEMORY INJECTION PROFILE 06/23/06 1 1D-125A 11213778 INJECTION PROFILE 07/17/06 1 2K-14 11213777 PRODUCTION PROFILE W/DEFT 07/16/06 1 1C-20 11213775 FBHP SURVEY 07/14/06 1 1J-156 11216308 USIT 07/10/06 1 2K-06 11213773 INJECTION PROFILE 07/12/06 1 2K-22 11249925 LDL 06/06/06 1 1 F-15 11249910 INJECTION PROFILE 06/05/06 1 1 E-36 11235375 PRODUCTION PROFILE 07/13/06 1 2K-17 11249923 PRODUCTION PROFILE/DEFT 07/04106 1 1 H-04' 11320991 INJECTION PROFILE 07/03/06 1 1D-1O'1 N/A INJECTION PROFILE 06/27/06 1 2Z-13- 11249930 LDL 07/11/06 1 1D-106 N/A INJECTION PROFILE 06/26/06 1 2M-21 11320987 PRODUCTION PROFILE 06/29/06 1 2W-01 11320985 PRODUCTION PROFILE/DEFT 06/14/06 1 1 E-28 11320986 PRODUCTION LOG 06/28/06 1 1J-101 40012836 MD & TVD VISION RESISTIVITY 12/20/05 2 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. e e TI-W. MATERIAL UNDER THIS COVER HAS .BEEN MICROFILMED ON OR BEFORE JANUARY 03, 2 001 M PL A T E E IA L U N u W I: T H IS M ARK E R C:LORILM~ILM.DOC AF'e dr'y ditch Was the we'ii Are we i'i Well T DA'FA_PLUS L 6200-~'?'? 00 L 6200-'~' 7676 L 4254~'~-7 '7 54 L. 4254'.~7778 L 4254~,7754 C O bi Bi E N T S T 4.200--'7780~ C,H'--'DTE/L. DTD samp i es co r"e d ? tests r'equir'ed?~'.~ ~-cei've~e,,~ 4~o n comp I iance -.--T~ - Ini t i a 'i r'equir'ed? yes (~¢,nd r'eceive~~ no yes (~_~-~,a'iysi:s & ciescr'i:pti'on I"e~"," y c E~ iq o STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown __ Pull tubing Alter casing Stimulate .. Plugging .. Perforate X Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X. Exploratory _ Stratigraphic _ Service 4. Location of well at surface 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM At top of productive interval 2519' FNL, 532' FEL, Sec. 9, T11N, R10E, UM At effective depth 2149' FNL, 591' FEL, Sec. 9, T11N, R10E, UM At total depth 2090' FNL, 603' FEL, Sec. 9, T11N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical 6. Datum elevation (DF or KB) RKB 1 7. Unit or Property name Kuparuk River Unit 8. Well number 1B-18 feet 9. Permit number/approval number .94-61 10. APl number 50-029-22472 11. Field/Pool Kuparuk River Field/Oil Pool 7824 feet Plugs (measured) None 6941 feet Effective depth: measured 7722 feet Junk (measured) None true vertical 6858 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 8 0' 1 6" 200 Sx AS I 1 21 ' 1 21 ' Surface 421 5' 7 - 5 / 8" 650 Sx AS III & 4 2 5 6' 41 4 8' Intermediate 300 Sx Class G Production 7768' 5-1/2" & 5" 210 Sx Class G 7809' 6928' Liner Perforation depth: measured 71 31'-7161',7166'-7176',7182'-7194',7526'-7539',7548'-7575',7246'-7273' true vertical 6620'.-6647.',6651 '-6660',6665'-6676',6699'-6709',6716'-6736', Tubing (size, grade, and measured depth) 3.5", 9.3#/ft. L-80 & 2-7/8" 6.5#/ft L-80 @ 7062',6481'-6501' Packers and SSSV (type and measured depth) ' ' PKR: Baker Seal Bore @ 7040'; SSSV: Camco WRDP-1 @ 1912' 13. Stimulation or cement squeeze summary _ Perforate 'C1' Sand w/6 SPF 90° phasing Intervals treated (measured) 7246'-7273' Treatment description including volumes used and final pressure .... ~ I,I,7~ Alaska Oil & Gas Cons. Commissior Anchor~, .~ 14. Prior to well operation Subsequent to operation Re0resentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 1350 112 990 16 900 Tubing Pressure 130 130 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~Y~~~ Title Wells Superintendent Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ARCO Alaska, Inc. Subsidiary of Atlantic Richfield Company WELL lB-18 DATE 2/4/95 DAY 2 DESCRIPTION OF WORK Perforate 'C 1' S ands CONTRACTOR / KEY PERSON Schlumberger / Gerard Johnson PBTD (RKB) [LAST TAG (RKB) - DATE 7722' I 7480' on 2/4/95 I HELD COST EST. $10,840 ~SSSV TYPE / STATUS WRDP / Removed KUPARUK RIVER UNIT WELL SERVICE REPORT AFC/CC# - SCA# 998318 / 11223 ACCUMULATED COST $13,724 TIME LOG ENTRY Initial: WHP=1350 IA=1350 OA--O 1330 MIRU SWS 1440 P.T. BOP/Lub to 2500, RIH w/FN/1-6' x 1 11/16" wt. bar/CCL/MPD/2 1/8" Enerjet gun 27' 6 SPF 90 deg. V Phasing. 1530 Tie-in with SWS CET dated 5/15/94. 1550 1555 1630 WHP=1350, opened well and bled down to 800#, position gun. CCL depth 7241.5', Interval=7246'-7273', fire gun. POOH. On Surface. All shots fired. RDMO. Summary Perforated 'CI' sand interval with 2 1/8" Enerjet III / DP, RDX 6-SPF 90 deg. 'V' phasing, -+45 degl orientation. 7246'-7273' (27') CHECK THIS BLOCK IF SUMMARY IS CONTINUED ON BACK Weather ITemp. Chill Factor [Visibility Wind Vel. [Signed Report miles mphI COMPLETE Randy Smith K.33 INCOMPLETE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. C:erations Performed: Operation Shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. ~',~me of Operator ARCO Alaska, Inc. 3. A.:dress P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM At top of productive interval 2519' FNL, 532' FEL, Sec. 9, TllN, R10E, UM At effective depth 2149' FNL, 591' FEL, Sec. 9, TllN, R10E, UM .zt total depth 2090' FNL, 603' FEL, Sec. 9, TllN. R10E,' UM 12. Present well condition summary ,3tal Depth: measured true vertical 7824 6941 feet feet 6. Datum elevation (DF or KB) RKB 1 02 feet 7. Unit or Property name Kuparuk River Unit 8. Well number 1B-18 9. Permit number/approval number 94-61 10. APl number 50-029-22472 11. Field/Pool Kuparuk River Field/Oil Pool Plugs (measured) None Effective depth: meaSured 7722 true vertical 6858 feet feet Junk (measured) None Casing L e n g t h Structural Conductor 8 0' Surface 4 21 5' Intermediate Production 7768' Liner Perforation depth: 13. Stimulation or cement squeeze summary Size Cemented 1 6" 200 Sx AS I 7-5/8" 650SxAS III & 300 Sx Class G 5-1/2" & 5" 210 Sx Class G Measured depth 121' 4256' 7809' True vertical depth 121' 4148' 6928' measured 7131' - 7161', 7166' - 7176', 7182' - 7194', 7526' - 7539', 7548' - 7575' true vertical 6620' - 6647', 6651' - 6660', 6665' - 6676', 6699' - 6709', 6716' - 6736' Tubing (size, grade, and measured depth) 3.5", 9.3#/ft.(type L-80measured & 2-7/8"depth)6.5#/ft L-80 @ 7062', Packers and SSSV and PKR: Baker Seal Bore @ 7040'; SSSV: Camco WRDP-1 @ 1912' ' C" Sand stimulation w/acid & N2 Intervals treated (measured) 7131' - 7161', 7166' - 7176', 71 82' - 7194', Treatment description including volumes used and final pressure Pump 10 BBL HCL w/50,000 SCF N2. Max WHTP = 6628 PSI. Gas Cons. commission Artcbor~. '" 14. Re0resentative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 1370 140 · Subsequent to operation 0 0 0 750 140 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ 3ally Report of Well Operations X Oil^v Gas Sus~bended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service Form 10-404 Rev 06/15/88 Title Wells Superintendent Date ~/Sf~"'~'- SUBMIT IN DUPLICATE ARCO Alaska, Inc. KUPARUK RIVER UNIT WELL SERVICE REPORT WELL DATE DAY / ,TIME 1t4.,5' DESCRIPTION OF WORK OPERATION Ar REPORT TIME FIEm EST: ~ COMPL~E ~ INCOMPL~E $ ~ 4, AFC/CC 9 9~3 / ~ ' ACCUMULATED COST ~/CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK /Wbather [Temp. Reloort OF AR3B-7031 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown Stimulate __ Plugging_ Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Loca[ion of well at surface 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM At top of productive interval 2519' FNL, 532' FEL, Sec. 9, T11N, R10E, UM At effective depth 2149' FNL, 591' FEL, Sec. 9, T11N, R10E, UM At total depth 2090' FNL, 603' FEL, Sec. 9, T11N, Ri0E, UM 12. Present well condition summary Total Depth: measured true vertical 7824 feet 694 1 feet 6. Datum elevation (DF or KB) RKB 102 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1B-18 9. Permit number/approval number 94-61 10. APl number ¢ 0-029-22472 11. Field/Pool Kuparuk River Field/Oil Pool Plugs (measured) None Effective depth: measured 7722 feet true vertical 685 8 feet Junk (measured) None Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth 80' 1 6" 200 SX AS I 12 1 ' 1 21 ' 421 5' 7-5/8" 650SxAS III & 4256' 41 48' 300 Sx Class G 7768' 5-1/2" & 5" 210SxClassG 7809' 6928' measured 71 31' 7161', 71 66' - 7176', 71 82' - 7194', 7526' - 7539', 7548' - 7575' true vertical 6620' 6647', 6651' 6660', 6665' - 6676', 6699' - 6709', 6716' - 6736' Tubing (size, grade, and measured depth) 3.5", 9.3#/ft. L-80 & 2-7/8" 6.5#/ft L-80 @ 7062', Packers and SSSV (type and measured depth) PKR: Baker Seal Bore @ 7040'; SSSV: Camco WRDP-1 @ 1912' RECEIVED 13. Stimulation or cement squeeze summary Perforate 'C' Sands w/6 SPF 90° phasing Intervals treated (measured) 7131' 7161', 7166' - 7176', 7182' - 7194', Treatment description including volumes used and final pressure 7 i99 Gas Cons. C0mmissior Anchor: 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 0 0 0 1350 0 0 1450 Tubing Pressure 130 130 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sigr~ .~/~~ ~ ¢¢t.~_, ~"(~ Title Wells S Form 10-404 Rev 06/15/88 uperintendent SUBMIT IN DUPLICATE AIi(~O Alaska. Inc. Subsidiary. of Atlantic Richfield Company WELL DESCRIP~'ION OF WORK KUPARUK RIVER UNIT WELL SERVICE REPORT lB-18 D~,T~ 1115/94 DAY TIME 0800 0930 1000 1045 PBTD (RKB) 7722' C SAND PERFORATING CONTRACTOR / KEY PERSON S CHL UMB ERGER/RAT HERT LAST TA? (RKB) - DATE 7722 - 06/10/94 LOG ENTRY - [AFC/CC# - SCA# - , , ] 998318 IFIELD COST EST. IAccuMULATED COST I $22,292 ! $22,292 [SSSV TYPE/STATUS" [CAMCO BP-Gl/REMOVED t 100 1130 1200 1230 1250 1330 1345 1415 1445 1515 MIRU SWS/VECO. HELD SAFETY MEETING. SITP - 1020 #, IA - 1400 #, OA - 0# PRESSURE TEST LUBRICATOR TO 3000 PSIG. TEST OK. RIH W/PERF GUN#1 - 6' WGT., CCL, MPD, 2-1/8" ENERJET III @ 6 SPF, 90 DEG PHASING AND 45 DEGREE ORIENTATION GUN TO PERF 7166' - 7176' & 7182 - 7194' ON BOTTOM AND TIED-IN USING CET DATED 5/15/94. IN POSITION @ 7161' TO SHOOT 7166' -7176' & 7182' - 7194'. FIRED GUNS. POH. AT SURFACE W/GUN # 1. INSPECT GUNS; ALL SHOTS FIRED. PRESSURE TEST LUBRICATOR TO 3000 PSIG. TEST OK. RIH W/PERF GUN#2 - 6' WGT., CCL, MPD, 2-1/8" ENERJET III @ 6 SPF, 90 DEG PHASING AND 45 DEGREE ORIENTATION GUN TO PERF 7131' - 7161' COMPLETED TIE-IN TO SHOOT 7131' - 7161'. IN POSITION @ 7126' TO SHOOT 7131' - 7161'. FIRED GUNS. POH. AT SURFACE W/GUN#2. INSPECT GUNS; ALL SHOTS FIRED. RD. COMPLETE RD. MO. SITP - 1050 #, IA - t400 #, OA - 0# SUMMARY: PERFORATE C SAND @ 7131'- 7161', 7166' - 7176', & 7182' - 7194' }CHECK TInS BLOCK IF SUMMARY IS CONTINUED ON BACK Weather Report ]Teml~. jChill Factor } [ COMPLETE] ] INC'OMPLETE Visibility I Wind Vel. I Signed , milesI mPhl ,~.. LC ~,. ~--~ ' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown Stimulate X Plugging Pull tubing Alter casing ~ Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service Location of well at surface 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM At top of productive interval 2519' FNL, 532' FEL, Sec. 9, T11N, R10E, UM At effective depth 2149' FNL, 591' FEL, Sec. 9, T11N, R10E, UM At total depth 2090' FNL, 603' FEL, Sec. 9, T11N, R10E, UM Present well condition summary Total Depth: measured true vertical 7824 6941 Effective depth: measured 7 7 2 2 true vertical 6858 12. 6. Datum elevation (DF or KB) RKB 102 feet 7. Unit or Property name Kuparuk River Unit 8. Well number 1B-18 9. Permit number/approval number 94-61 10. APl number 50-029-22472 11. Field/Pool Kuparuk River Field/Oil Pool feet feet feet feet Plugs (measured) None Junk (measured) None ORIG NAL Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 80' 4215' 7768' I 6" 200 Sx AS I 7-5/8" 650 Sx AS III & 300 Sx Class G 5-1/2" & 5" 210 Sx Class G measured 7526' - 7539', 7548' - 7575' true vertical 6699' - 6709', 6716' - 6736' Tubing (size, grade, and measured depth) 3.5", 9.3#/ft. L-80 & 2-7/8" 6.5#/ft L-80 @ 7062', Packers and SSSV (type and measured depth) PKR: Baker Seal Bore @ 7040'; SSSV: Camco WRDP-1 @ 1912' Measured depth True vertical depth 121' 121' 4256' 4148' 7809' 6928' 13. Stimulation or cement squeeze summary 14. Fracture Stimulate 'A' Sands Intervals treated (measured) iX)t,5~ 0~1 & GaS 60flS. 60~tSS't0f~ 7526' - 7539', 7548' - 7575' · 'Af~ch0rt Treatment description including volumes used and final pressure 36.7 Mlbs 20/40 & 114.3 Mlbs 12/18 ceramic proppant. Final WHTP 7500 psi. Representative Daily Average Production or In!ection D~ta OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 0 300 Subsequent to operation 0 0 0 1000 800 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations ..X 16. Status of well classification as: Oil X Gas Suspended Service 17'. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Title Wells Superintendent Date ,/','/,/~ ~'~ ..~-' SUBMIT IN DUPLICATE ARCO Alaska, Inc. KUPARUK RIVER UNIT WELL SERVICE REPORT WELL DATE DAY TIME osa, q t~oo DESCRIPTION OF WORK A CONTRACTOR/KEY PERSON OPERATION AT REPORT TIME COMPLETE [] INCOMPLETE FIELD EST: LOG ENTRY AFC/CC ACCUMULATED COST PAGE 1 OF t~ c~/~ D vD ~ E~ CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Weather I Temp. Chill Factor Visibility Wind Vel. I °F °F miles knots Signed Report AR3B-7031 ARCO Alaska, Inc. Date: July 5, 1994 Transmittal #: 9116 RETURN TO: ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Operations File Clerk ATe- 1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. and return one signed copy of this transmittal. 3H-26 1B-18 Receipt Acknowledged: LIS Tape and Listing: HLDT LIS Tape and Listing: 06-03-94 DITE, LDTD, CNTG, GR Depth Shifted Tape DISTRIBUTION: Bob Ocanas Please acknowledge receipt ! 05-23-94 94162 94194 Date: State of Alaska ARCO Alaska, Inc. Date: July 1, 1994 Transmittal #: 9111 RETURN TO: ARCO Alaska, inc. Attn: Sarah Bowen Kuparuk Ol:[erations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK '- 99510-0360 Transmitted below are the following open hole items. receipt and return one signed copy of this transmittal. Please acknowledge f 18-15 18-14 18-14 18-14 18-16 18-16 | 18-16 / 18-14 1B-14 1B-15 1B-15 1B-13 1B-13 16-13 18-17 18-17 '-""~'~,L~ - ~.q 3H-26 ! / 18't8-~ / P h'a s0 P m :eSsed) o~q_~\ (1B~181~ /compen's'a~ed ~ Neutron~ Lith01isg'~D~-hi~i~.;(RaW Data) \18~18 .'¥ ,/Compensated Neutron; ~, HLDT 05-02-94 6650-7300 HLDT 04-05-94 7250-6730 HLDT 03-30-94 9640-9200 CDR 03-18-94 5650-9980 CDR Enhancement 03-18-94 8900-9970 CNT'-G 04-05-94 6670-7350 CDR 03-24-94 4370-7450 CDR Enhancement 03-24-94 6440-7430 TDTP 03-28-94 6640-7340 TDTP 03-25-94 9200-9770 CNT-G 03-30-94 9200-9770 CNT-G 05-02-94 6650-7260 CDR Enhancement 04-14-94 6450-7440 CDR 04-14-94 4100-7450 CDR Enhancement 04-20-94 6800-7890 CDR 04-20-94 4420-7890 CDN 04-20-94 4420-7890 CDR ' 03-29-94 4160-6640 CDR Enhancement 03-29-94 4240-6640 HLD~ ~.¢~) 04-05-94- 6102~450 Dual [ndUCtion,SFL, GR 04,29,94'. 4254~_ .77.78~ Lithology D.e, nsity~ (5 ~'; Porosity)7 Acknowledged: _~ ~/~~ 04,29-94 04-29'94'.! Date: 4254:'~754:;' .. 4254;7754' ] ECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL i~ GAS [] SUSPENDED r~ ABANDONED ["-] SERVICE r~ 2N f ' ameo uperator 7 Permit Number ARCO Alaska, Inc 94-61 3 Address 8 APl Number _ . ~' ~ ~ ~ 50-22472 4 Location of well at sudace ..... '~ ;¥' ~ ~ ~ ' 9 Unit or Lease Name 500 FNL 292 FEL Sec9 T11N R10E UMw; .. ", ~ ~ KUPARUKRIVER AtTop Producing Inte~al ~ ~'"-/_,, j 10 Well Number 2519' FSL, 532' FEL, Sec 9, T11N, R10E, UM ? V~:~..~f~'~ 1B-18 ~.~~ , ~ ~ 11 FieidandPoo, At Total Dep~ 2090' FSL, 603' FEL, Sec 9, T11 N, R10E, UM ~~ KUPARUK RIVER 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. 102' rkb 61' pad ADL 25648 ALK 466 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 15 Water Dep~, if offshore 16 No. of Completions 04/21/94 04/28/94 6/10/94(Comp) NA feet MSL 1 7824' mO, ~41' ~d 7722' md, ~858' ~d Y~8 ~ ~0 ~ ~ ~ ~' leet MD ~700' ~80X ~ Ty~o filoctdc or O~or k~s Bun DISFL, CNL, CBT, CET 23 CASING, LINER AND CEMENTING RECORD SE~ING DEPTH MD CASING SIZE ~ GRADE TOP ~ HOLE SIZE C~~ 16. 62.5~ H-40 SURF 121' 24" 200 SXS ASI LEAD 7.625 29.7ff L-80 SURF 4256' 9.875" 650 sxs ASIII LEAD, 300 sxs G TAIL TOP JOB W/26 BBLS ASI 5.5 X 5. 17ff/18~ L-80 SURF 7809' 6.75" 210 sxs G TAIL 24 Pedorations open to Production (MD+~D of Top and BoEom and 25 TUBING RECORD inte~al, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2" 9.2~/9.3~ L-80 7062' 7050'(Baker Seal Assy) 7526'-7539' ~ 4 spf 6699'-6709' Nd 7548'-7575' ~ 4 spf 6716'-6736' ~d 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27 PRODUCTION TEST Date First Pr~uction ~Me~ of Opera~on (FIo~ng, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD FIowTubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28 CORE DATA Brief description of li~olo~, porosi~, fra~ures, apparent dips and presence of oil, gas or water. Submit core chips. NA Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ARCO ALASKA INC. .,-. DAILY OPERATION. PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT: APPROVAL: lB-18 NORTH SLOPE BOROUGH KUPARUK RIVER KUPARUK RIVER ADL 25648 ALK 466 50-029-22472 94-61 ACCEPT: 04/21/94 03:30 SPUD: 04/21/94 10:30 RELEASE: 06/10/94 07:30 OPERATION: DRLG RIG: PARKER 245 WO/C RIG: NORDIC 1 04/22/94 ( 1) PARKER 245 TD: 840'( o) DRILL & MWD SURVEY 16"@ 121' MW: 9.6 VIS:102 04/23/94 ( 2) PARKER 245 TD: 4030' (3190) MOVE RIG F/lB-13 TO lB-18. NU 20" DIVERTER SYSTEM. FUNCTION TEST DIVERTER. CHECK F/LEAKS. DOUG AMOS W/AOGCC WAIVED WITNESSING TEST. PU 4" DP & HWDP. PU NAVI-DRILL, MU BIT, MU ON ONE STAND HWDP. SPUD @ 2230 HRS. DRILL TO 285' CIRC & CLEAN HOLE @ 285'_ POOH, SET BACK 3 STDS HWDP, PU BHA, RIH, WASH & REAM 30' & DRILL MWD SURV TO 840'. DRILL & MWD SURV 16"@ 121' MW:10.0 VIS: 55 DRILL & MWD SURVEY TO 4030' 04/24/94 ( 3) PARKER 245 TD: 4270' ( 240) 04/25/94 ( 4) PARKER 245 TD: 6165' (1895) 04/26/94 ( 5) PARKER 245 TD: 6957' ( 792) 04/27/94 ( 6) PARKER 245 TD: 7490' ( 533) TEST BOPE 7-5/8"@ 4255' MW:10.1 VIS: 49 DRILL & MWD SURV F/4030'-4270' CBU. SHORT TRIP. CIRC & COND MUD. POOH. CHANGE OUT JARS. LD MWD, MONEL & MOTOR. RUN 94 JTS 7-5/8" , 29.7#, LTC CSG & FLUTED HGR. SHOE @ 4256'. CIRC & COND MUD. RU DOWELL & CMT W/650 SX LEAD CMT FOLLOWED BY 300 SX CLASS G CMT. BMP PLUG, FLOATS HELD. CIP @ 2400 HRS 04/23/94. WASH OUT DIVERTOR. ND, RUN 1" PIPE IN 16" X 7-5/8" ANN, PERFORM TOP JOB W/26 BBLS ASI, INSTALL PACKOFF. MU FMC SPEED HEAD & TORQUE TO 20,000 FT/LBS. NU BOP & PREP TO TEST. DRILL & MWD SURVEY 7-5/8"@ 4255' MW: 8.8 VIS: 37 TEST BOPE TO 300/3000 PSI. SET WEAR RING & LD TEST EQUIP. MU 6-3/4" BHA, ORIENT & TEST MWD. TIH. TEST 7-5/8" CSG TO 2500 PSI F/30 MIN. DRILL FC, CMT, FS, & 10' NEW FORMATION TO 4280'. RUN LOT W/8.9 PPG MUD. DID NOT BREAK DOWN W/810 PSI. EMW=12.6 PPG. DRILL 6-3/4" HOLE & SURV W/MWD F/4280'-6165'. WT UP MUD SYSTEM 7-5/8"@ 4255' MW:10.8 VIS: 51 DRILL 6-3/4" HOLE & SURV W/MWD F/6165'-6957'. STARTED LOSING MUD W/10.3 PPG MUD. CUT STROKES F/70 TO 60 & MAINTAINED VOLUME OF MUD. CBU. MONITOR WELL & PUMP SLUG. POOH. LD MWD & MOTOR. MU BHA %3 & TIH. CIRC & COND MUD. ADD 30% PER BBL LCM & GRAD BRING MUD WT TO 11.6 PPG. PRESENT WT 11.3 PPG. DRILLING 7-5/8"@ 4255' MW:ll.6 VIS: 47 CIRC & COND MUD, INCREASE MUD WT TO 11.6 PPG. DRILL 6-3/~" HOLE F/6957'-7150'. CBU. NO GAS. DRILL F/7:~O'r~,~4~, ~.[~ WELL: lB-18 Ami: 50-029-22472 PERMIT: 94-61 PAGE: 2 04/28/94 ( 7) PARKER 245 TD: 7704' ( 214) 04/29/94 ( 8) PARKER 245 TD: 7824' ( 120) 04/30/94 ( 9) PARKER 245 TD: 7824'( 0) 05/01/94 (10) PARKER 245 TD: 7824'( 0) 05/14/94 (11) DOWELL TD: 7824 DRILLING 7-5/8"@ 4255' MW:ll.6 VIS: 46 DRILL F/7490'-7550' MONITOR HOLE, GAINED 20 BBLS, DROP SURV. PMP 6 STD OUT OF HOLE, MONITOR HOLE, PUMP PILL, POH, RETRIEVE SURV. CHANGE BIT, TOTAL LOSS OF 13 BBLS. RIH TO 7-5/8" SHOE. SERVICE TOP DRIVE, FILL PIPE. CUT 90' DRILL LINE. RIH TO 7500'. FILL PIPE, PRECAUTIONARY REAM TO 7550' DRILL F/7550'-7704' WIPER TRIP F/LOGS 7-5/8"@ 4255' MW:ll.6 VIS: 47 DRILL F/7704'-7824'. MONITOR WELL, FLOWING, DROP SURV, PMP SLUG. POH F/LOGS, HOLE SLICK. RU SCHLUMBERGER. LOG W/TRIPPLE COMBO(DITE,LDT,CNTG/GR), UNABLE TO GET PAST 7314', POH & RD SWS. MU BHA & RIH F/WIPER TRIP, FILL PIPE @ 3000' & 6000' BRIDGE @ 7320', WORK THROUGH HARDER BRIDGE @ 7380' WIPER TRIP F/LOGS 5"@ 7809' MW:ll.6 VIS: 46 CIRC & COND MUD, MUD GAS CUT TO 10.3 PPG. ROTATE & PMP OUT STDS F/7824'-7102' MONITOR FLOW, PMP SLUG. POOH TO LOG. RU SCHLUMBERGER, LOG W/TRIPLE COMBO(DITE/LDT/CNTG/GR) . RD SWS. LD BHA, STABS, SHORT DC. PULL WEAR BUSHING, SET TEST PLUG, CHANGE OUT TOP PIPE RAMS, TEST DOORS TO 300 & 3000#. PULL TEST PLUG & LD TEST TOOLS. RU TO RUN CSG. HOLD SAFETY MEETING. RUN 5" & 5-1/2" CSG. BREAK CIRC @ SHOE, PARTIAL RETURNS, WELL FLOWING AFTER CIRC. CONT RIH W/CSG SLOWLY. RIG RELEASED 5"@ 7809' MW: 0.0 VIS: 0 FIN RIH W/CSG. MU CMT HEAD. CIRC & RECIP CSG, PARTIAL RETURNS, PMP @ 3.5 BPM. PMP 20 BBLS H20, TEST LINES, PMP 15 BBLS PREFLUSH, 70 BBLS SPACER, 210 SX CLASS G CMT. WASH LINES, DROP TOP PLUG. DISPLACE W/ll.6 BRINE, BMP PLUG W/176 BBLS, CHECK FLOATS, RD CMT HEAD. MONITOR WELL, ANN FLOWING. FLUSH STACK, CHANGE OUT TOP PIPE RAMS TO 4" MAKE FINAL CUT & DRESS, INSTALL PACKOFF. INSTALL TREE & TEST, INJ FINAL WELL FLUIDS & RELEASE RIG F/ MOVE @ 1900 HRS 04/30/94. 5"@ 7809' PERFORMED ARCTIC PACK 06/09/94 (12) NORDIC 1 TD: 7824 mB: 7722 PERF A-SAND 5"@ 7809' MW:ll.5 NaCl MOVE RIG F/lB-19 TO lB-18. ACCEPT RIG @ 0230 HRS 06/09/94. ND MASTER VALVE. NU 7-1/16" BOP STACK. TEST BLIND RAMS & 5-1/2" CSG TO 3500 PSI F/30 MIN-OK. RU SCHLUMBERGER WL. TEST LUB TO 1000 PSI. RIH W/20' OF 3-3/8" mERE GUNS. mERE A-SAND F/7555'-7575' @ 4 SPF. CORRELATED TO CET DATED 06/15/94. POOH W/WL. WELL: lB-18 API: 50-029-22472 PERMIT: 94-61 PAGE: 3 06/10/94 (13) NORDIC 1 TD: 7824 PB: 7722 NU FMC 3-1/8" TREE 5"@ 7809' MW:ll.6 NaCl FIN PERF A-SAND F/7526'-7539'/7548'-7575' W/3-3/8" BH CSG GUNS @ 4 SPF 180 DEG PHASING. NU FLOW LINE. RU FLOOR TO RUN TBG. RIH W/3-1/2" SLIMHOLE COMPLETION W/2-7/8" GLM. MU CAMCO 3-1/2" BP-61 HYDRAULIC LANDING NIPPLE. TEST CONTROL LINE TO 5000 PSI. CONT RIH W/3-1/2" BTC SPECIAL CLEARANCE TBG. STAB INTO SBE AND VERIFY W/500 PSI. SPACE OUT & MU FMC 6 X 3-1/2" TBG HGR. TEST CONTROL LINE TO 5000 PSI. LAND TBG. RU OTIS SL UNIT. RIH, PULL PACK-OFF FROM BP NIPPLE. RIH & SET STANDING VALVE IN "D" NIPPLE @ 6984' WLM. RIH & SET PACK-OFF IN BP NIPPLE. ATTEMPT TO BREAK CIRC DN ANN THRU 3/8" CIRC VALVE BEFORE ANN TEST. COULD NOT CIRC THROUGH CIRC VALVE. ATTEMPT TO TEST TBG TO 3000 PSI. INJ INTO FORMATION 2 BPM @ 2000 PSI-STANDING VALVE NOT HOLDING PRESS. RIH W/SL, PULL PACK-OFF F/BP NIPPLE. RIH, PULL STANDING VALVE. RIH, PULL 3/8" CIRC VALVE F/BTM GLM. CIRC 5 BBLS OF DIESEL DN ANN FOR FREEZE PROTECTION. RIH W/"i" DUMMY VALVE & SET IN BTM GLM. TEST ANN TO 3000 PSI F/15 MIN-TEST OK. RIH & SET PACK-OFF IN BP LANDING NIPPLE. TEST CONTROL LINE TO 5000 PSI. RD OTIS WL UNIT. SET BPV. SET BACK BOP STACK. NU FMC GEN IV 3-1/8" 5000# TREE. 06/11/94 (14) NORDIC 1 TD: 7824 PB: 7722 RIG RELEASED 5"@ 7809' MW:ll.6 NaC1 FIN NU OF FMC GEN IV 3-1/8" 5000 PSI TREE. TEST PACK-OFF TO 5000 PSI. TEST OPEN BODY OF TREE TO 250/5000 PSI-OK. BULLHEAD 4 BBLS DIESEL DOWN TBG @ 1300 PSI F/FREEZE PROTECTION. DRAIN LINES-SECURE WELL. RIG RELEASED 0730 HRS 06/10/94. SIGNATURE: DATE: [~K~'ANY AE~OALASKA~ INC. ~LL NAME 1B-t8 LOC. ATIlt 1 Kt$'AR~', LOCATION 2 ALASKA MAG)~STIC DECLINATI~I 28,92 DATEr 28-A~-94 WELL ~]MBER 0 WELL HEAD LOCATION: LAT(N/-S) O,r~j AZI~]TH FROM ROT~Y ?ABL~ TO TARGET IS TIE IN POINT(TIP) : MEASURED DEPTH 121,00 TRUE ~:'I DI:F"I'H 121.00 INCLINA?ION AZIMUTH 213,5~ LATi?UD£(N/-S) 0,00 D£PART~(E/-W) 0,00 D~'(E/-W) 0,00 M~SLFr~ED IN%RVA~ V~TIC~L D~PTH 1~1~00 0~0 1~1~ ~.?.67 ~.,7 46~.67 931.?1 1851,~ 458,7 1851,28 ************* ~'~gRILL ************** S~VEY ~LCULATI~E; .**.*** RADIUS OF CUR~TUF~ METHOD*****-*** T~ET ~ATION AZIMU~ LATITOD£ SECTION I~LN, N/-S ft deg deg ft O,¢.,b 0,00 213,58 0,,~ O J3 0,~ 213,58 -0,68 4,~ 0,66 191,~4 -4,13 8,66 0,~. ~1 ..,~. 12,~- 0,72 222,18 ~B-16 D~F'AF,~JR£ DISF'LACEMEN? at £/-W ft ft 0,00 -0.45 0.82 -1,89 4.54 -3,74 9.0? -6,77 13,74 AZIMUTH deo 0.00 213,56 204,53 204,31 2¢y?,50 DLS deo/ l~)ft 0.00 0.08 0.09 0.07 0.05 ~19,02 467.7 2318,~0 2778,8? 459,9 2778,67 2870,36 91.5 2870,!3 2965,97 95,6 2965,66 ~_,64 89,9 19.04 1,05 2sJ6,69 -17,86 28,16 1,27 185,24 -26,76 ~,12 1.19 164,08 -28+72 oz,~ 2,23 I69,87 -3i,56 5~.',35 6,35 169,55 -~,17 -10,83 20.90 211,19 -13,37 29.92 2~,54 0,11 -13,53 31,74 205,2~ 0,09 -13,38 34.26 202,97 1,17 -12,16 40,07 1~7,69 4,56 3149,,,¢~ 93,7 3147,97 3240.64 91,1 3332,74 92.1 3326,72 3423.34 ~,6 34!3,98 3515,37 92,0 3501,70 52,~ 10,63 175,74 -5i.89 -10,41 52,92 191,34 4.66 70,64 12.42 177.(FJ -70,04 -9,25 70,65 187.53 1,99 91.~ 14,73 !75.33 -91,60 -7,81 91.93 164.87 115,89 16,47 179,07 -115.93 -6,62 116.12 183,27 2,22 143,59 16,73 183,82 -143,73 -7,32 143,9l 182,92 2,91 ~E4)?.90 94.5 3702,16 92,3 3674,69 3793,52 91,4 3756,71 3884.89 91,4 3836,82 3977,~. 92,5 3915,43 176,71 22.~ 184.~ -176,78 213,76 25.05 1~,21 -213,66 253.96 27,20 166,12 -253,57 297,68_. 30.26 188,07 -2~7,05 346,56 33,26 185,57 -345,23 -?,87 177,06 1~3.20 3,83 -13,49 214,01 163,61 -18,50 254,25 184,17 2,53 -24,69 298.08 164.75 3.35. -31,73 346.66 185.25 3.28 4068.85 91,5 399t,82 4181,?? 113,1 4086.20 SLIM 1SL~:~YS 4402,10 220.1 4269,54 4.~1,60 279,5 4492.4? 4862,60 181,0 4629.61 ~k6.P..6 23,50 190.14 -394,91 459,15 23,40 1~,.~. -456,42 580.87 33,80 169.20 -576,72 749.14 40.~D 186,40 -743.~. &57.28 41.20 186,40 -860.87 -39.91 396,92 185,77 0,97 -50,17 459,17 166.27 0.64 -69,28 580.87 166.85 0.20 -92,12 749,15 167.06 2,40 -105.29 867,29 186,97 0,50 5045,10 182,5 4768.26 5320,20 275,1 4981,91 %~00,60 2.~D,4 5200,26 5787,80 187,2 5350.79 5976,00 190,2 5511,90 985.90 ~.90 189,20 -978,41 1159,12 ~.20 187,70 -1149.83 1[<~,98 ~'.50 188,00 -1324,06 1446,14 23~40 186.40 -1434o35 1547,20 30,80 187,FX~ -1534.72 -121,37 985,91 1~7,07 -146,85 1159.17 187.28 -170.88 1335.04 167.35 -164,81 1446.21 187,34 -196,60 1547,26 167.30 1,23 0,71 0,47 3,30 1 6063,60 85,6 5584,88 6156,~ 94,4 5.~f,3,46 6366,00 210,0 5830,35 6527.70 159.7 5952,76 6710.40 182,7 6089,92 1591,92 32,20 185.70 -1579,I7 1644.21 35.10 I69.?0 -1630.96 1.77.1,31 37.60 179.40 -1757,75 1673.08 4C..5~, 18~[~.10 17~3,11 42,40 181,50 -1980,98 -201,55 1591,98 187,27 -205.65 1644.27 167.2~ -218.96 1771,34 167.10 -215,51 1873,09 166,70 -220,19 1993,18 166.34 1,62 3,94 3.71 0,52 1,26 E897,50 187,1 6227.20 SINGLE SMOT SUF~EYS 7423,0,3 525.5 6621,62 7722,~D 2??.0 6858,(~ TF£ LAST ~VE¥ IS PROJECTED 7824.00 102,0 6~40,52 211~,.,~ 43,20 lEE),60 -2108.07 2466,18 39,50 !91,92 -,45z.,1 2648,47 36, O~D 191,92 -2631,59 2708,19 ~.00 191.92 -2690,25 -2~2,75 211?,81 186,03 0,50 -261,14 24E4.,37 lg6,08 -298,74 ~' ~ ~ . ~.~1 164,46 -311.32 27~.20 166.60 1,56. 1,17 0.00 ARCO Alaska, Inc. Date: May 27, 1994 Transmittal #: 9100 RETURN TO: ARCO Alaska, Inc. ATTN: Sarah Bowen Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following Cased Hole items. receipt and return one signed copy of this transmittal. B-18 ~A'0t~''/'~l B-i 9 B-19 ement Evaluation Log CBT ment Bond Log CET v,Cement Evaluation Log CET ~Cement Bond Log CBT Please acknowledge 05-15-94 6200-7676 05-15-94 6200-7700 05-16-94 7150-8596 05-16-94 7150-8620 Receipt Acknowledge: DISTRIBUTION: Drilling State of Aiaska(+sepia) ALASKA OIL AND GAS · CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR ~.. 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 19, 1994 A W McBride Area Drilling Engineer ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit lB-18 ARCO Alaska, Inc. Permit No: 94-61 Sur. Loc. 500'FNL, 292'FEL, Sec. 9, TllN, R10E, UM Btmhole Loc. 2163'FSL, 604'FEL, Sec. 9, TllN, R10E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman~ BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ~ AI..A~- ~ OIL AND GAS CONSERVATION COMMIS;.,.,.)N PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill ri lb Type of Well Exploratory J-'J Stratigraphic Test [] Development Oil X Re-Entry D Deepen r'~ Service ~] Development Gas r~ Single Zone X Multiple Zone [] '2.. Name of Operator 5. Datum Elevation (DF or KB) 1 0. Reid and Pool ARCO Alaska, Inc. RKB 41', Pad 61' feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360t Anchorage, AK 99510-0360 ADL 25648, ALK 466 4. Location of well at surface 7. Unit or property Name 1 1. Type Bond (see 20 AAC 25.025) 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 2575' FSL, 555' FEL, Sec. 9, T11N, R10E, UM 1B-18 #U-630610 At total dep{h 9. Approximate spud date Amount 2163' FSL, 604' FEL, Sec. 9, T11N, R10E, UM 4/22/94 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 1B-07 7767' MD 604' @ TD feet 30' ~ 500' MD feet 2560 6888' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 2950' feet Maximum hole angle 38.93o Maxirnumsudace 2457 psig At total depth (TV•) 3735 psig 18. Casing program Setting Depth size Specifications Top , Bottom Quantit~ of cement Hole Casin~l Weic, lht Grade Couplin~l Len~lth MD TVD MD TVD (include sta~le dataI 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' _+_200 CF 9.875" 7.625" 29.7# L-80 LTC 4207' 41' 41' 4248' 4150' 630 Sx Arcticset III & HF-ERW 280 Sx Class G 6.75" 5.5" 17.0# L-80 LTCMOC 7005' 41' 41' 7046' 6327' 210 Sx ClassG HF-ERW Top 500' above Kuparuk 6.75" 5" 18.0# L-80 LTC 721' 7046' 6327' 7767' 6888' HF-ERW 1 9. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural sCu°r~:cU:t°r ~ ~ C ~IV Intermediate Production . Liner 1'"~, ¥' ~ '~ ~) Perforation depth: measured - ;~ ;, true vertical ,:,~? %,',~ d:i (~. 0,-3S O0J'IS. 0orfl,~iSS~,0~ Anchorage 20. Attachments Filing fee X Property plat ~ BOPSketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot 8 Refraction analysis r"'J Seabed report [] 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~/~~ Title Area Drilling Engineer Date ¢/ Commission Use Only J J See cover letter for Permit(:~,~ -~'//Number 50-APl numbero2..?_ ,;~..~_/~'".~,2_ Approval datec:~ -- / ~ -" ~'~--7~ other recluirements Conditions of approval Samples required ~ Yes [] No Mud log required [-'] Yes [] No Hydrogen sulfidemeasures ~--~ Yes [] No Directional survey required ]~] Yes [--~ No Required working pressure for BOPE r'~ 2M ~ 3M D 5M [~] 10U ~ 15M Other: Original Signed By by order of Approved by David W. Johnston Commissioner the commission Date // Form 10-401 Rev. 7-24-89 Subr lit in triolicate DRILLING FLUID PROGRAM Well 1B-18 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 7-5/8" surface casing 9.0-10.0 15-25 15-35 50-80* 5-15 15-40 10-12 9.5-10 +10% Drill out to wei~]ht up 8.4-9.6 5-15 5-8 30-40 2-4 4-8 8-10 9.5-10 4-7% Drilling Fluid System' Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes' Weight up to TD 11.6 10-18 8-12 35-50 2-4 4-8 4-5 thru Kuparuk 9.5-10 <12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ff. This shows that formation breakdown would occur before a surface pressure of 2,457 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest well to 1 B-18 is 1B-07. As designed, the minimum distance between the two wells would be 30' @ 500' MD. The wells would diverge from that point. Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well or will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 225 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 50-80 sec/qt to drill gravel beds. RECEIYED Anchorage I · · 1 0 · · . g, 10. 11. 12. 13. 14. 15. 16. 17. GENERAL DRILUNG PROCEDURE KUPARUK RIVER FIELD 1B-18 Move in and rig up Parker #245. Install diverter system. Drill 9-7/8" hole to 7-5/8" surface casing point (4248') according to directional plan· Run and cement 7-5/8" casing· Install and test BOPE. Test casing to 2000 psi. Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 6-3/4" hole to total depth (7767') according to directional plan. Run open hole logs as directed. Run and cement 5-1/2" x 5" casing. (If significant hydrocarbon zones are present above the Kuparuk, sufficient cement will be pumped for isolation in accordance with Rule 20 AAC 25·030. Alternatively, if significant hydrocarbon zones occur within 200' TVD of the surface casing shoe, cement will be down squeezed in the annular space between the surface and production casing after the primary cement job is completed.) ND BOPE. NU tubinghead & full opening valve for cased hole logging. Secure well and release rig. Run cased hole cement evaluation. ND full opening valve & NU tree assembly. Move in and rig up Nordic #1. Install and test BOPE. Test casing to 3500 psi. Perforate and run completion assembly. Test tubing x casing annulus. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. RECEIVED ARC 0 ALASKA, Inc.' Structure : Pad lB Well : 1El i I I V 250 _ - 0 - _ 250_ - 750_ 1250. 2000. _ 2750_ _ 37502 4250. ~7~. _ I I I I I 2~ 0 Scale ~ : 125.00 RKB EI.EVA'rto~: 102' Field : Kuparuk River Unit Location : North Slope, Alaska !Created by : jones For: D PETRASH iDote plotted ' 7-Apr-94 JPIot Reference is 18 Version #5. jCoordinates are in feet reference slot #18. iTrue Vertical Depths are reference wellhead. ,! --- Baker Hughes INTEQ --- ESTIMATED SURFACE LOCATION: .500' FNL, 292' FEL SEC. 9. TllN, R10£ <-- West .... 450 .3O0 150 O 150 I I ~ I I I I I B/ PERMAFROST Tv'D=1677 6.8 DEG W (TO TARGa, T) /oUGNU SNDS TVD=2917 P TVD=2950 TMD=2950 DEP=O 6.00 BUILD .3 DEG / 100' 12.00 18.00 T/ W SAK SNDSTVD=3552 TMD=3562 DEP=97 24.00 30.00 B/ W SAK SNDS WD=3950 TMD=4002 DEP=283 36 aa 7 ¢/'~"  6. EOC / CASING PT TVD=4150 IUD=4248 OEP=424 K-IO TVD=4344 TbtD=4497 DEP=581 -,, · K-5 TVD=5216 TMD=5618 DEP=1285 ITARGET LOCATION: I 2575' FSL, 555' F-EL SEC. 9, T11N, R10£ TARGET TVD=6374 TMD=7107 DEP=2221 SOUTH 2205 WEST 263 AVERAGE ANGLE 38.93 DEG I I I I i i I 500 750 IOiX) 1250 0 150 45,0 75,0 _ _ o1~ J,500 o 1950 _ .2100 _ .2250 _ _24010 _ _ _2700 ~ TD LOCATION: '~ 216.3' FSL, 6041 FEL  SEC. 9, T~I!?~., RIOE. ~. TARGET - T/ ~ONE D TVD=6S?4 T~D=?JO? DEP=222! ~ ~ X,~ZONE c '[VD=6405 TMD=7, 46 DEP=2246 ~ x~ X,,~/ ZONE A TVD=6629 TMD=7434 DEP=2427 _.-- '% ~ X~B/,KUPSNDS TVD=S732TMD=7567DEP-2510 RFEE ~ ~ TD TVD=6888 134D=7'767 DEP=2635 ' .... I I i I ;50 I i I t I ~! I \ 1750 20~O 2 25C~ 2'750 Vertical Section on 186.80 azimuth wlth reference 0.00 N, 0.0O E from slot ill8 I I V IVED ~, ~.~ ~::;a (.iii & Gas Cons. CornmJssJon Anchurage OL~- OgL- OgL- O~:L- O~- Og- 0~'- 0 - O<Z- Og · oui 'WISVqV 03~ ~-~ OOgL ~.=J 006 t OOL~/~ OOL 00~ I ~~ II I I I I I I I 06 09 0~' 0 OE' 09 06 0;: L O§ L OS L 0 I. ~ 00'0~2' I, altoS Casing Design / Cement Calculations 12-Apr-94 Surface Csg MD: Surface Csg TVD: Production Csg MD: Production Csg TVD: Top of West Sak, TMD: Top of Target, TMD: Top of Target, TVD: Estimated Pressure: Surface Casing Choice: Production Csg Choice: Production Casing Frac. Pressure 4,248 ft 4,150 ft 7,767 ft 6,888 ft 3,562 ft 7,107 ft 6,374 ft 3735 psi ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ** .............. ~-~'r'F~l~r ...... '.'.'.' ....... '-',',','-,',-.'.'.'.."'. 3,500 ps~ Maximum anticipated surface pressure TVD surface shoe = 4,150 ft {(13.5'0.052)-0.11}*TVDshoe =1 2,457 psiJ Estimated BH pressure at top of target zone Estimated Pressure= Top of Target, TVD = Overbalance, psi= Anticipated Mud Weight =1 3,735 psi 6,374 ft 100 psi Surface lead: Top West Sak, TMD = 3,562 ft Design lead bottom 500 ft above the Top of West Sak = 3,062 ft Annular area = 0.2148 cf/If Lead length * Annulus area = 742 cf Excess factor = 65% Cement volume required = 1,224 cf Yield for Permafrost Cmt = 1.94 Cement volume required =1 630 sxI Surface tail: TMD shoe = 4,248 ft (surface TD - 500' above West Sak) * (Annulus area) = 255 cf Length of cmt inside csg = 85 ft Internal csg volume = 0.2578 cf/If Cmt required in casing = 22 cf Total cmt = 277 cf Excess factor = 15% Cement volume required = 318 cf Yield for Class G cmt = 1.15 Cement volume required =[ 280 sxI RECEIVED Casing Design / Cement Calculations 12-Apr-94 Production tail: TMD = 7,767 ft Top of Target, TMD = 7,107 ft TOC 500' above top of Kuparuk = 6,607 ft 5" casing x 6-3/4" annulus = 0.1122 cf/If 5" annular volume = 81 cf 5-1/2" casing x 6-3/4" annulus = 0.0835 cf/If 5-1/2" annular volume to 500' above top Kuparuk) = 33 cf Length of cmt in csg = 85 ft Internal csg volume = 0.0997 Cmt required in casing = 8 cf Total cmt = 123 cf Excess factor = 100% Cement volume required = 246 cf Yield for Class G cmt = 1.19 Cement volume required =[ 210 sxJ TENSION - Minimum Design Factors are: T(pb)=l.5 and T(jS)=I.8 Surface (Pipe Body): Casing Rated For: Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (WEft) Buoyancy = Weight of displaced mud Length Casing Wt (Ib/ft) Dead Wt in Air Buoyancy = Tension (Pipe Body) Design Factor Surface (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (WEft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =[ Production (Pipe Body): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (WEft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Pipe Body) = Design Factor =l Production (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (WEft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =[ 683000 lb 4,248 ft 29.70 Ib/ft 126165.6 lb 21323.5 lb 104842.1 lb 6.5] 566000 lb 4,248 ft 29.70 Ib/ft 126165.6 lb 21323.5 lb 104842.1 lb 5.41 397000 lb 7,767 ft 17.00 Ib/ft 132039.0 lb 22651.7 lb 109387.3 lb 3380OO lb 7,767 ft 17.00 Ib/ft 132039.0 lb 22651.7 lb 109387.3 lb 3.11 Casing Design / Cement Calculations BURST - Minimum Desiqn Factor = 1.1 Surface Casing: Burst = Maximum surface pressure Casing Rated For: Max Shut-in Pres = Design Factor =[ 5-1/2" Production Csg: 1. Design Case- Tubing leak while well is $1 Inside pres=Csg Frac pres(3500 psi)+Mud Wt*.052*TVD Outside Pres=Backup Gradient (8.9ppg *0.052*TVD) Net Pressure = Pressure inside-Pressure outside Design Factor = Rating / Net Pressure Casing Rated For: Inside pressure = Outside Pressure = Net Pressure = Design Factor =[ COLLAPSE- Minimum Design Factor = 1.0 -- Surface Casing 1. Design Case - Lost circulation and Fluid level drops to 2000' TVD with 9.0 # Mud 2. Ext. Pres=Mud Wt*0.052*TVD-(2000'TVD of 9# Mud) Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =[ 5-1/2" Production Csg 1. Worst Case - Full evacuation of casing 2. Mud weight on outside = Mud Wt * 0.052 * TVD Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =[ **Calculations are based upon 5-1/2" casing as it has lower burst & collapse than the 5". 12-Apr-94 6890 psi 2456.8 psi 2.8J 7740 psi 7552 psi 3188 psi 4365 ps!, 1 ,Si 4790 psi 0.588 Ib/ft 1506 psi 3.21 6290 psi 0.588 Ib/ft 4052 psi 1.6J Casing Design / Cement Calculations 12-Apr-94 Surface Casing Choices OD ID Ib/ft Grade Metal X-Section Jt Strength 7.625 6.875 29.7 L-80 8.5412 sq. in. 566000 lb Body Strength 683OOO lb Collapse 4790 psi Burst 6890 psi Production Casing Choices OD ID Ib/ft Grade Metal X-Section Jt Strength 5.500 4.892 17 L-80 4.9624 sq. in. 338000 lb 5.000 4.276 18 L-80 5.2746 sq. in. 376000 lb Body Strength 397000 lb 422OOO lb Collapse 6290 psi 10490 psi Burst 7740 psi 10140 psi [eECE]VED , ' dPARUK RIVER UNI', 20" DIVERTER SCHEMATIC I 3 , © , DO NOT SHUT IN DIVERTER AND VALVES AT SAME TIME UNDER ANY CIRCUMSTANCES. MAINTENANCE & OPERATION . UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD 3. DIVERTER ASSEMBLY WITH ONE 2-1/16"- 2000 PSI BALL VALVE 4. 20" - 2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20" - 2000 PSI ANNULAR PREVENTER EDF 3/10/92 ,6 , 13 5/8" 5000 PS. BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3(XX) PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. 5 BOP STACK TEST 4 . 2 , 1. FILL BOP STACK AND MANIFOLD WITH WATER. 2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILLAND CHOKE LINE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. 7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. CONTINUE TESTING ALL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3000 PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JTAND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16' - 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5(XX) PSI SPACER SPOOL 4. 13-5/8" - 5000 PSI PIPE RAMS 5. 13-,.5/8" -5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5(X)O PSI ANNULAR WELL PERMIT CHECKLIST ADMINISTRATION 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary.. 6. Well located proper distance from other wells ..... · 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... ~ 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval... 13. Can permit be approved before 15-day wait ....... ENGINEERING 14. Conductor string provided ............... 15. Surface casing, protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............ 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed ......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ~~ psig.~ 27. Choke manifold complies w/API RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y~ 31. Data presented on potential overpressure zones ..... V N 32. Seismic analysis 9f shallow gas zones ......... ~ N 33. Seabed condition survey (if off-shore) ....... /. Y N 34. Contact name/phone for weekly progress reports . . ~.. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: z o HOW/jo - A:~FORMS~cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIx. No special 'effort has been made to chronologically organize this category of information. 'DNI '~'I~ ODS~ t 3~N XN~d~OD ~mmmmmmmmmm~m~mmmmmmmmmm~mmmm~ ~mmmmmmmmmmmmm~m~mmmmmmmmmmm~ , , ~3~N3D DNI&AdWOD V~g~q~ , IS TaDe Verliication Listing chlumberger AlasKa Computln~ Center 3-JON-1994 10:14 **** REEl, HEADER **** SERVICE NAME : EDIT DATE : ga/06/ 2 ORICIM : FLIC REEL NAME : 93429 CONTINUATION # PREVIOUS REEL COM"ENT : ARCO ALASKA INC,, KUPARUK RIVER, IY-31, 500292238100 **** TAPE HEADER **** SMRVICE NAMM : EDIT DATE : 94/06/ 2 ORIGIN : FLIC TAPE NAME : 93429 CONTINUATION # : 1 pREVIOUS TAPE : CO~EMT : ARC[] ALASKA INC., KUPARUK RIVER, 1Y-]I, 500292238100 TAPE MEADER KUPARUK RIVER UNIT OPEN HOLE WIRELINE LOGS WELL NA~E: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE; JOB DATA JOB NU~BER~ LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSb: FEb: FwL: ELEVATION(FT FRO~ MSL O) KELLY BUSHING: D~RRICK FLOOR: GROUND LEVEL: ~ELb CASING RECORD STRING STRING 1B-IB 5002922472 ~RCO ALASKA INC SC~LUMBERGE~ WEb~ SERVICES 1 -JU~q-94 RU~ 1 94194 SIMMONS B. CHIVVIS RUN 2 RUN 3 ~m ~m~ 9 5O0 292 102,00 61.20 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) O0 ~,625 4256 -o O0 O0 Tape VerlflcatioD Listing chlumberger Alaska Computing Center 3-JUN-1994 10:14 3RD STRING O0 O0 PRODUCTION STRINC REMARKS: THE PHASOR INDUCTION, bDT, CNTG, AND GR ~ERE RUN IN COMBINATION. $ $ **** FILE ~EADER **** FILE NAME : EOIT SERVICE : FLIC VERSION : O0ICO1 DATE : 94/06/ MAX AEC SIZE = 1.024 FILE TYPE = LO L~ST FILE : PAGEI FILE HEADER FILE NUgBER: 1 EDITED OPEN HOLE MAIN PASS ~11 tool strlngs; Depth s~ffted and clipped curves; all runs'merged; no cased hole data, DEPTH INCREMENT: 0.5000 # FILM SUMMARY LDWG TOOL CODE START DEPTH ~TE . 0. SDN 7754.0 CNTG 7735.0 '"~ ~ II BASELINE CURVE FOR SHI~TS, GR CURVE SHIFT DATA (~EASURED DEPTH) BASELINE DEPTH M~RGED DATA SOURCE LDWG TOOL CODE RUN NO. $ REMARKS: STOP DEPTH 4254,0 4~54,0 4~54,0 PASS ~ERGE TOP m~mm~mmmmm # LIS FORgAT DATA. DUE TO THE FACT THAT THE TOOLS ERE RUN IN COmBINATIOn{, NO O~PI{'~ SHIFTS WERE REOUI~ED, $ ----------EOUIVALENT UNSHIFTED DEPTH--------~- DTE SDN CNTG IS Tape Verification Listing ChlUmberger AlasKa Computing Center 3-JON-lggg 10:14 PAGE~ DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB TYPE REPR CODE VAbUE ! 66 -o 2 66 0 3 73 152 4 66 1 5 66 6 73 7 65 9 65 11 66 6 1~ 6a 13 66 0 14 65 FT ~5 66 68 16 66 1 0 66 0 mmmmmmmmmmmmmmmmmmmmmmmmmmmmmm ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 API AP1 APl FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CDASS MOD NUMB SA~P ESE~ CODE .(HEX) DEPT FT 645252 O0 000 O0 0 1 I 1 4 68 IDPM DTE OHMM 645252 O0 000 O0 0 1 1 I 4 68 IMP~ DTE OHMM 645252 O0 000 O0 0 1 ~ I 4 68 ILD D~E OHMM 645252 O0 000 O0 0 1 1 1 4 68 IbM DTE OHM~ 645252 O0 000 O0 0 I 1 ! 4 68 SFL DTE 645252 O0 000 00 0 1 ! i 4 68 SP DTE MV 645252 O0 000 O0 0 1 1 1 4 68 GR DTE GAPI 645252 O0 000 O0 0 1 1 1 4 68 TENS DTE 58 645252 O0 000 O0 0 1 1 1 4 68 TEND DTE ~8 645252 O0 000 O0 0 1 1 ~ 4 68 ~TEM DTE DEGF 645252 O0 000 O0 0 ! 1 1 4 68 MAES DTE OHMM 645252 O0 000 O0 0 1 1 I 4 68 RHOB SDM G/C] 645252 O0 000 O0 0 I ! ! 4 68 D~HO SDN G/C3 645252 O0 000 O0 0 I I 1 4 68 PEF SDN BN/E 645252 O0 000 O0 0 1 ! i 4 68 CAb~ SON IN 645252 O0 000 O0 0 1 1 1 4 68 GR SDN GAPi 645252 O0 000 O0 0 i I 1 4 68 TENS SDN LB 645252 O0 000 O0 0 1 ! 1 4 68 TEND SON LB 645252 O0 000 O0 O 1 ! 1 4 68 ~TEM SON DEGF 645252 O0 000 O0 0 1 1 1 4 68 MAES SDN OHMM 645252 O0 000 O0 0 i I, 1 4 68 NPH~ CNTG PU-S 645252 O0 000 O0 0 i 1 1 4 68 ENPH CNTG PU-S 645252 O0 000 O0 0 1 I I 4 68 CPH! C~TG PU-S 645252 O0 000 O0 0 1 I 1 4 68 FCNT CtiTG CPS 645252 O0 000 O0 0 1 1 1 4 68 NCNT CNTG CPS 645252 O0 000 O0 0 i 1 ~. 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 IS Tape Verlf LIS Tape Yeriflcatlon Listlnq chlumberger A Scblumberqer AlasKa Co.nputin~ Center 3-jUN-1994 10:14 PAGE= DEPT. IL~.DTE TENS.DTE RHO~.SDN M~ES.$DN FCNT.CNTG ENRA.CNTG CNEC.CNTG MTEM.CNTG DEPT. IDM.DTE TENS.DTE RHOB.SON ENR~ NTG CNEC.CNTG MTE~.CNTG ** END OF ~ **** FIb} SERVICE VERSION DATE MAX REC SIZ} FILE TYPE LAST FILE **** Fib} SERVIC~ VERSION DATE MAX REC SIZ~ FILE TY~E FIb~ HEADER FILM NUMBER RAW O~EN MO! Curves a~ Sadleroc~ API PI AP F E B N B SIZE REPR PROCESS ID O~DER # bOG TYPE CLASS MOD NUMB SAMP EhEM CODE (HEX) CRAT CNTG 645252 O0 00001!0 0 1 4 68 0000000000 NRAT CNTG 6~5252 O0 000 O0 0 1 I ! 4 68 ENRA CNTG 645252 O0 000 O0 0 I 1 1 4 68 CFTC CNTG CPS 645252 O0 000 O0 0 1 1 I 4 68 CNTC CNTG CPS 645252 O0 000 O0 0 1 1 1 4 68 CFEC Ci~TG CPS 645252 O0 OOO O0 0 1 1 I 4 68 CNEC CNTG CPS 645252 O0 000 O0 0 1 1 1 4 68 GR CNTG GAPI 645252 O0 000 O0 0 1 1 1 4 68 TENS CNTG LB 645252 O0 000 O0 0 1 ! ~ 4 68 TEND CNTG LB 645252 O0 000 O0 0 1 I 1 4 68 MTE~ C~TG DEGF 645252 O0 000 O0 0 1 1 1 4 68 MRAS CNTG OHM~ 645252 O0 000 O0 0 1 1 ! 4 68 mmm~#mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm#m.m.mmm.mm#mmmmmm.mmmmm...m..mmmm! 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 mmm...~mmmm..mm! ** DAT~ ** DEPT. 7780.000 IDPH.DT5 -999.250 IMPH.OTE 1.858 ILD.DTE IL~.DTE 1.864 SFb. DTE -999.250 SP.DTg -999.250 GR DTE TENS.DTE 3875.000 TEND.DTE 839.61] MTEiq.DT~ -999.250 MRES~DTE RHOB.SOM -999.250 DRHO.$DN -999.~50 PEF.$DN -999.250 CALl.SON G~.SDN -999.250 TEN$.SDN 3875.000 TEND.SON 839.613 STEM.SON MRE$.SDN -999.25U ~PHI.CNTG -999.250 ENPH.CNTG -999o250 CPMI.CNTG FCNT.CNTG -999.250 NCNT.CNTG -999.250 CRAT.CNTG -999..250 NRAT.CNTG ENRA.C~TG -999.250 CFTC.CNT~ -999.~50 CNTC.CNTG -999.250 CFECiCNTG CNEC.CNTG. -999.250 GR.CNTG -999.250 TENS,CNTG 3875.000 TEND.CNTG MTE~.CNTG -999.250 MRAS.CN~G -999.250 D~PT. 7000.000 IDPM.DTE 1.445 IMPH.DTE T:Ns. DIL~E TE ! .477 SFL.DTE 1.395 SP.DTE .DT~ 3395.000 T~CND. DTE 872.698 ~TEbi.OT~ RHOB,SON 2.285 DRHO.$DN 0.006 PEF.SDN G~ SON 114.698 TENS SD~ ~395.000 TEND.$DN MRES:SON 0.963 ~:'~PHI: ~. ~ . C..~ G 5~ 237 ENPH.CNTG FCNT CNTG 477.060 NCNT.CNTG 1787.6~7 CRAT.CNTG ENRA:C~TG 5.64.7 CFTC.CNTG 485.574 C~TC.CNTG CNEC.CNTG 2749.408 GR.CNTG 114.698 TENS.CNTG MT~2~.CNTG 135.i64 MRA$.CN~fG 0.9~3 DEPT. 6000.000 IOPM.DTE 1.977 IMPH.DTE ILM.DTE 1.956 SFL.DTE 2.364 SP.DTE TENS.DTE 32~5.000 TEND.DTE 924.442 MTE~.OTE RHO~.$DN 2.342 DR~O.SD~ 0.011 PEF.$DN G~.$DN 152.538 TEN&.SDm 3215.0~0 TEND.SON MRES.SDN 1.051 NPHI.CNTG 41.694 ENPH.CNTG FCNT.CNTG 6i2.134 NCNT.CNTG 2075.713 CRAT.CNTG ENRa.CNTG 4.975 CFTC.CNTG 6q9.4~6 CNTC.CNTG CN~C..CNTG 294!.109 GR.CNTG 15~.538 TEN~.CNTG MTE~.CNTG 1~0.690 MRA$.CNTG 1.0Si 1 465 -15 188 115 1~4 4~777 872 698 41 779 3 899 !832 528 ]395 000 2,036 3 '17.~4o 120'714 34 041 3i320 2133 646 3215.000 ILD.DTE GR.DTE MRES,DTE CALl.SON MTEM,SDN CPHI.CNTG NRAT.CNTG CFEC,CNTG TMND,CNTG !LD.DTE GR.DTE MRES.DTE CALl.SON STEM.SON CPHI.CNTG NRAT.CNTG CFEC.CNTG TEND.CNTG '999,250 '999,250 '999.~50 '999 250 ~999 -9'99 250 -999 250 -999 250 839 613 114 0,963 b 284 4,132 486,,$55 872 698 151 949 538 i 051 7 t,4 120 69~ 40 345 3,2.88 '166 IS Tape Verlflcation Listing chlumberger AlasKa Computln~ Center 3-JUN-1994 10:14 PAGE: interval) followed Dy files for other main pass tool strings per run, RUN NU~BE~: TOOL STRING pASS NUMBER: 2 DEPTH INCREMENT: 0,5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DITE''' ............. '~=:~ .... LDT 7~ii ,0 CNTG 7 .0 S LOG HEADER DATA DATE LOGGED; SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: · O DRILLER (FT): TO 50GGER(FT): TOP LOG INTERVAL (FT): BOTTOM bOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL COOE TOOL TYPE A~$-A AUX SEAS MECH SONDE A~S-A AUX ~EAS ELEC SONDE SGT-L GAMMA RAY CARTRIDGE CNT-G COMP NEUTRON CART CMT-G NEUTRON SOURCE LDT-D NUCLEAR SERVICE CART LDT-D DENSITY $ONDE bDT-D POWERED GAMMA DETECTOR LDT-D GAMMA RAY SOURCE DIT-E DUAL INDUCTION CART OIT-E DUAL INDUCTION SONDE $ BOREHOGE ANO CASING DATA OPEN HOLE BIT SIZE CIN): DRILLERS CASING DEPTH EFT): LOGGERS CASING DEPTH EFT): STOP DEPTH 4189,5' 4189,5 4189,5 BOREHOLE CONDITIONS MUD TYPE; ~UD DENSITY (LB/G): MUD VISCOSITY MUD FL~ID bOSS (C3): MAXiMU~ RECORDED TEMPERATURE (DEGF): RESISTIVITY (08~M) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 2g-APR-g4 5C0-423 800 ~415 7824,0 425 0 777 0 9oo.6 29-APR-94 29-APR-94 TOOL NUMBER AMS-AA 712 AME-AA 712 SGC-SA 60 CNC-GA 125 NSR-F 2290 NSC-E 775 DRS-C 4950 PGD-G ]764 GSR-J 19~2 DIC-EB 3 7 DIS-HB 379 4254,0 WT, DISPERSED .0 9,5 144.0 2,140 71.0 IS Tape Verification Listing chlumberger AlasKa Computing Center 3-JUN-19g4 lO:t4 MUD AT OOTTO~ HOtE TEMPERATURE FIf, TRATE AT (MT): FILTRATE AT CAKE AT (MT): CAKE AT (BHT): MEI]TROM TOOL TOOt, TYPE (EP!THERMAL UR THERMAL): MATRIX~ MATRIX DENSITY: HOLE CORRECTION (IN): 1,020 2,2t0 71.0 71.0 EPITHERMAb SANDSTONE 2.65 # TO06 STANDOFF (IN): 0.5 # ~ENARKS: .75 IN RUBBER STANDOFFS AND 2' HOLE FINDER USED ON DIL. MATRIXmSANDSTONE,'MDEN:2,65 G/CC. HOgE CORRECTION : CALIPER, 36 OF FILL ON BOTTOM BRIDGED AT 7314' ON FIRST ATTEMPT DOWNHOLE. LIS FOR~T DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - ~4EB ** TYPE REP~ CODE VALUE  66 0 66 0 3 73 2~4 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 3 13 66 0 i4 65 FT 15 66 68 16 66 0 66 IS ?ape verification Listing chlumberger AlasKa Computino Center 3-JUN-1994 10:14 PAGE{ ** SET TYPE - CHAN ** NAME V U I E R OCE ID ORDER # bOG TYPE CbAMS MOD NUMB SA~P ELEM CODE (HEX) DEP? FT 645252 O0 000 O0 0 2 ! 1 4 6B IIRD DTM MMHO 645252 O0 000 O0 0 ~ 1 I 4 6B IIXD DTE MMHO 645252 O0 000 O0 0 ~ 1 I 4 ~$ IIR~ DTE M~HO 645252 O0 000 O0 0 2 1 1 4 68 IIX~ DTE MMHO 645252 O0 000 O0 0 2 1 1 4 68 CIDP DTE MMHO 645252 O0 000 O0 0 2 ! 1 4 68 IDPH DTE OHMM 645252 O0 000 O0 0 2 1 1 4 6B CIMP DTE M~HO 645252 O0 000 O0 0 2 ! I 4 6B IMPH D~E OHMM 645252 O0 000 O0 0 2 i I 4 68 IDQF DTE 645252 O0 000 O0 0 2 1 1 4 68 IMQ? DTE 645252 O0 000 O0 0 2 1 1 4 68 CILD D~E ~HO 645252 O0 000 O0 0 2 ! i 4 68 ILD DTE OH~ 645252 O0 000 O0 0 2 ! ! 4 68 CIL~ DTE AMMO 645252 O0 000 O0 0 2 i 1 4 68 ILM DTE OH~ 645252 O0 000 O0 0 2 ! I 4 68 SFLU D~E OHMM 645252 O0 000 O0 0 2 i 1 4 68 SP DTE MV 645252 O0 000 O0 0 2 ! 1 4 68 TENS DTE ~B 645252 O0 000 O0 0 2 ! i 4 6B HTEN DTE LB 645252 O0 000 O0 0 2 1 X 4 68 ~RE$ DTE OHMM 645252 O0 000 O0 0 2 ! 1 4 68 ~TEM DTE DEGF 645252 O0 000 O0 0 2 I 1 4 68 GR DTE GAPI 645252 O0 000 O0 0 2 1 1 4 68 TENS CNT LB 645252 O0 000 O0 0 2 1 I 4 68 HTEN CNT LB 645252 O0 000 O0 0 2 ! I 4 68 ~RES CNT OH~M 645252 O0 000 O0 0 ~ ! i 4 68 MTE~ CNT DEGF 645252 O0 000 O0 0 ~ 1 ! 4 ~8 CALI CNT IN 645252 O0 000 O0 0 2 ~ I 4 68 RTNR CNT 645252 O0 000 O0 0 2 ! ! 4 68 ENRA CNT 645292 O0 000 00 0 2 1 1 4 68 RCNT CNT CPS 645252 O0 000 O0 0 2 ! 1 4 68 RCFT CNT CPS 645252 O0 000 O0 0 2 ! I 4 68 RCEN CNT CPS 645252 O0 000 O0 0 2 1 I 4 6B RCEF CNT CPS 645252 O0 000 O0 0 2 1 i 4 68 TNRA CNT 6~5252 O0 000 O0 0 2 1 i 4 6B CNTC CNT CPS 645252 O0 000 O0 0 2 I ! 4 68 CFTC CNT CPS 645252 O0 000 O0 0 2 I i 4 68 CNEC CNT CPS 645252 O0 000 O0 0 2 ! 1 4 68 CFEC CNT CPS 645252 OO 000 O0 0 2 I I 4 68 TNpH CNT PU 645252 O0 000 O0 0 ~ ! ! 4 68 ENPH CNT PU 645252 O0 000 O0 0 2 ! 1 4 68 NPH! CNT PU 645252 O0 000 O0 0 2 ! i 4 68 NPOR CNT PU 645252 O0 000 O0 0 2 1 1 4 68 GR CNT GAPI 645252 O0 000 00 0 2 i I 4 68 TENS GDT 6B 645252 O0 000 O0 0 2 i I 4 68 HTEM LOT LB 645252 O0 000 O0 0 2 i 1 4 68 ~RES LDT OHM~ 645252 O0 000 O0 0 2 ! i 4 68 MTE~ LDT DEGF 645252 O0 000 O0 0 2 1 i 4 68 DRHO LDT G/C3 6~5252 O0 000 O0 0 2 1 1 4 68 LSRH LDT G/C3 645252 O0 000 O0 0 2 1 1 4 68 LURH LDT G/C3 645252 O0 000 O0 0 2 i 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 IS Tape Verlflcat~.on Listing chlumberger AlasKa Computlnd Center 3-JUN-1994 10:14 PAGEs NAMF SER U SEPVICE AP E EPR PR CESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) PEP bDT 645 52 0 0 01.8 LDT 645252 O0 GSS bDT 645252 O0 000 RHOB LUT G/C3 645252 O0 000 $1RH LDT G/C3 645252 O0 000 LSHv bDT V 645252 O0 000 $SRV bDT V 645252 O0 000 LL bDT CPS 645252 O0 000 Li] bDT CPS 645252 O0 OOb LS LDT CPS 645252 O0 000 LITH LOT CPS 645252 O0 000 SSi LDT CPS 645252 O0 000 SS2 bDT CPS 645252 O0 000 C~bT LOT IN 645252 O0 000 DPH! LOT PU 645252 O0 000 GR L~T GAPI 645252 O0 000 O0 0 2 1 ! 4 68 0000000000 O0 0 2 I i 4 68 0000000000 O0 0 2 1 I 4 68 0000000000 O0 0 2 I 1 4 68 0000000000 O0 0 2 ! 1 4 68 0000000000 O0 0 2 1 1 4 68 0000000000 O0 0 2 I 1 4 68 0000000000 O0 0 2 I 1 4 68 0000000000 O0 0 2 ! ! 4 68 0000000000 O0 0 2 1 I 4 68 0000000000 O0 0 2 1 I 4 68 0000000000 O0 0 2 1 I 4 68 0000000000 O0 0 2 1 I 4 68 0000000000 O0 0 2 I 1 4 68 0000000000 O0 0 2 1 1 4 68 0000000000 O0 0 2 1 1 4 68 0000000000 DE~T 7809.000 IIRD'DTE II ~[DTE 40.349 ClDP.DTE I~PH.DTE 1.947 IDOF~DTE ILD DTE 1.910 CIL~,DTE SP:DTE -20,000 TENS.DTE MTE~.DTE 143,787 GR'DTE MRES,CNT 0-944 ~TEM,CNT ENRA RCNT. T 734.107 TNRA.CNT CNEC.CNT 3165.121 CFEC.CNT NPH~.CNT 35.43i NPOR,CNT HTE~{.LOT -114.271 ~RE$..LDT LSRH.LOT 2-162 LURH.~DT Q$S bDT 0.030 RHOB.LDT $SHV~LDT 1214.535 Lb. LDT LIT~.LOT 66.949 SS1.LDT DPHI.LDT 30.409 GR.LDT DEPT. 7000.000 IIRD.DTE IIX~.DTE 67.364 CIDP.DTE INPH,DTE 1.465 IDQF.DTE I5D DTE ~,4~3 CIL~.DTE SP~DTE -1~. 188 TENS.DTE MTE~.DTE 135.i64 GR.DTE MR~s,CMT 0.963 MTEM.CNT RCEF NT 489.743 TNRA.CNT CNEC.~NT 2749,408 CFEC'CNT NPHI.CNT 5~.237 NPOR.CNT BTEN.LDT 872.698 ~RES.LDT 6 IIXD.DTE 0.000 IMOF,DTE 512,827 ILM.DTE 1450-000 HTEN,DTB 101,746 TENS,CNT 143,787 CALt-CNT 2239:475 RCFT,~T 2.902 CNTC. T 736.730 TNPH,CNT 34.244 GR.CNT 0.944 MTEM~bDT 2,150 PEF~bDT 2,148 $1RH.hDT 255,241 LU,~DT 264.239 SS2,LDT 101.746 535.400 IIXD.DTE 692.203 IDPH.OTE 0.000 IMOF,OTE 676.993 ILM,DTE 3395.000 HTEN,DTE 114,698 TENS,CNT 3.899 CNTC NT 4~6.855 TNPH.CNT 50,604 GR,CNT 0,963 MTE~,LDT 87 425 ~910 000 11~9 0 734 107 22O4,942 34 244 10~.7~6 14 787 7~183 2 198 52O 943 364.429 125.487 ~.445 0 000 1 477 872 698 339~:000284 477.060 1832,528 48,435 114.698 135.164 IlR~ DTE 472.420 CI~P!DTE 5!5,724 ClbD DTE 523,508 SFLU'DTE 2,000 ~RES.DTE 0'944 HTEN,CNT -1i4,27i RTNR.CNT $,000 RCEN.CNT CFTC.CNT 766,666 ENPH,CNT 27,838 TENS,bDT 1450e000 DRHO,bDT -0'009 OLS,LDT '0,~132 LSHViLOT 1!60'076 · L$.LDT 515,713 CAbI.L~T 5'886 IIR~.DTE 617,145 DTE 702, 23 ~RES,DTE 0 63 HTEN,CNT 872 CFTC.CNT 48 . ' ENPH.CNT 41.,779 TENS,bDT 3395,0'00 DRHO.bDT 0,006 Tape Verification Listing chlumberger AlasKa Computtn~ Center LSRH.LDT 2.283 LURH,LDT 2 O$$.LDT 0.042 RHOS.LDT 2 SSHV.LDT 1215.656 Lb. LDT 226 bITH.LOT 91.665 SSi.bDT 266 DPHI.LDT 22.119 GR.LDT 114 DEPT. 6000.000 IIRD.DTE IIX~.DTE 32.918 CIDP.DTE IMPH.DTE 2.036 IDOF.DTE ILD.DTE 1,949 CILM.DTE SP.DTE -17.813 TEN$.DTE MTE~.DTE 120.690 GR.DTE MRES.CNT 1.051 MTEM.CNT E~R~.CNT 4,975 RCNT.CNT RCEF.CNT 619 594 TNRA.CNT CNEC.CNT 2941:~09 CFEC.CNT NPHT.CNT 41.694 NPOR.CNT HTEN.LDT 924.442 ~RE$,~DT LSR~.LDT 2,336 LURH.bDT OSS.LDT 0.059 RHOB,LDT SSHV.LDT 1214.012 Lh,LDT LIT~.LDT 83.502 SSi.LOT DPHI,LDT 18.692 GR.LDT I~Pg:DTE 2,470 IDQF,DTE ILD.DTE 2,453 CILM,DTE SP.DTE -15,563 TENS'DTE MTE~.DTE 10~.270 GR.QTE MRES.CNT 1.225 MTEM CNT ~CEF:~NT 675,353 TNRA.CNT CNEC NT 30~3,894 CFEC,CNT NPHI,CNT 40,606 NPOR,CNT HTEN,LDT 912,474 LSRH,LDT 2,294 bURH.bDT OSS.LOT 0'041 RMOB,LDT SS~.LDT 1212..19~ ....bDT 106'067 DPHI.LDT 21.552 GR,bDT I~pM DTE 1950.000 IDQF,DTE IbP DTE !5.447 C~LM,DTE SP DTE -19.813 TEN$.DTE MTEM DTE 94.873 GR,DTE MRES.CNT 1.427 MTEM.CNT EMR~.CNT 6.265 RCMT.CNT RCEF, CNT 424.198 TNRA.CNT CNEC,CNT 25 2 700 CF£C,CNT NPHI,CNT 54,034 NPOR,CNT HTEN.LDT 855 053 ~RES.LDT RH.LDT 2:671 LURH.L~T 3-JUN-1994 10114 416 505 0 511 3215 152 120 2075 3 591 42 1 2 2 204 266 152 .296 PEK.hOT .285 SiRH.LDT .0~5 bO.bDT .790 SS2.LDT .698 IIXD.DTE .217 ILM.DT£ .000 HTEN,DTE .538 TENS.CNT .690 CALI,CNT .713 RCFT~CNT .320 CNTC,CNT ~66 TNPH.CNT ~373 GR,CNT .051 ~TE~.UDT 348 PEF'SDT :342 S1RH,~DT .788 LU.LDT 31 $$2,bOT . 334.565 IIXD.DTE 406'463 IDPH,DTE 0.000 IM~F,DTE 409,155 ILM'DTE 2870 000 HTEN,DTE 86 198 TEN$,CNT 106 270 CALI,CNT 2578,141 RCFT,CNT 3.238 CNTC,CNT TNPH,CNT 666,182 39'600 GR~CNT 1,225 ~TEM*bDT 2 ~05 PEF.hDT 2:94 S1RH,~DT 225.605 LU,~DT 2~5,765 86,198 65 73 0 -226 2530 49 94 1351 3 411 50 1 2 .196 IIXD.DTE ,804 IDP?i'DTg .000 IMGF.OTE ,5~5 ILM,DTE 000 HTEN.DTE 15Z9 .873 CAI.,I,CNT .855 RCFT-CNT .976 CNTC,CNT .781 TNPM.CNT .821 GR.CMT ,427 MTEM,hOT .714 PEF'LDT 4.777 2.259 401.968 353.424 77 5 .95 7.142 6~2,1~4 2133,646 40.345 152,538 120.690 4olt4 36 168 341;840 60 50~ 2 4.6 0 000 2 444 912.474 2870~:000 6,763 761..923 2558 606 39 239 86.198 I06,270 3.~715 2 ~71 395 902 351 839 '~:757 549 0,000 1950,000 855;053 2530,000 6 847 366 826 ~425 787 48 964 28 586 QbS.LDT bSHV.LDT LS.bDT CALl.bDT IIRM.DTE ILD DTE MRE$.DTE ~TEN.CNT RTNR.CNT RCEN.CNT CFTC.C~T ENPH.CNT TENS.LDT DRHO.LDT ~LS,LOT LSH¥.LDT LS.LDT CA~I.LDT IIRM.DTE ClNP..DTE ClLD.DTE MFLU,DTE MRE$,DTE HTEN'CNT RTNR.CNT RCEN.CNT ENPH. tT TENS.LOT DRHO,LOT QLS,LDT LSMV,LDT .LS.LDT CALI.LDT DTE CI~D,DTE SF~U,DTE MRES,DTE HTEN,CNT RTNR,CNT RCEN.CNT CFTC,CNT ENPH.CNT TENS,LOT DRHO,LDT QL$.LDT PAGE1 I0 -0.029 116 42~'501 .,070 6,.284 470,986 491,202 513,151 2,364 924.442 3,288 2802,771 649.486 34.041 321~,000 o0 115~,823 388,872 7,142 379.464 404.922 1,225 912,474 ,86'5 ,00 -0:018 1155 468 423,556 6,763 9700,000 1,427 ,053 3'76 962. 48 993 2530 000 '-0 70 ":0 0~3 Tape Verification Listing chlumberger AlasKa Computing Center 3'ddN-19g4 i0~ PAGE~ 11 OSS,LOT -0,132 RHOB.bDT 5SHV.LDT 1213,535 Lb.bDT LITHoLDT 22,680 SSI,hDT DPHI.LDT 43.177 GR.LDT 1.938 $1RH,LDT !13.490 LU,LDT 84,027 SS2.LDT 49.529 4,240 hSHV,LDT 221.314 ES,LOT 139,140 CALI,LDT 1155,239 224.147 6.847 END OF DATA **** FILE TRAILER **** FILE NA~E : EDIT SERVICE : FLIC VERSION : OO1CO! DATE : 94/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO hAST FiLE **** FILE HEADER FILE NAME : EDTT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 94/06/ 2 ~AX REC SIZE : i024 FIL~ TYPE : LO hAST FILE FILE HEADER FILE NUMBER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool string #1 fo Sadlerochlt run presented first (primary depth control'string used to depth shift the Sadler interval) followed ~¥ files for other ma~n pass tool. strings per run, RUN NUMBER: 1 TOOL STRING NUMBER~ 1 PASS NUMBER: 2 D~PTH INCREMENT: 0.0833 ~IL~ S{JMMARY VENDOR TOO[, CODE START DEPTH LDT 7~09.0 $ NOG HEADER DATA DATE 50GGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TI~E LOGGER ON BOTTOM: TD DRILLER STOP DEPTH 4189,7 29-APR-94 5C0-423 800 29-APR-94 !41.5 29-APR-94 7824.0 Tape Verification blstino chlumberger AlasKa Cosputlng Center 3-JUN-1994 10:14 12 TD LOGGER(FT): TOP LOG INTERVAL BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AM$-A AUX ~EAS MECH SONDE A~S-A AUX SEAS ELEC SONDE SGT-L GAMMA RAY CARTRIDGE CNT-G COMP NEUTRON CART CNT-G NEUTRON SOURCE bDT-D NUCLEAR SERVICE CART LDT-D DENSITY SONDE bDT-D POWERED GAMMA DETECTOR ~DT-D GAMMA RAY SOURCE OIT-E DUAL INDUCTION CART DIT-E DUAL INDUCTION SONDE BOREHOLE CONDITIONS MUD TYPE: ~UD DENSITY ~LB/G)I MUD VISCOSIT ~UD PM: FLUID LOSS (C3): ~AXIMUM RECORDED TE,PERATURE (DEGF): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF)~ MUD AT MEASURED TEMPERATURE MUD AT BOTTO. HOL~ TEMPERATURE (BHT)~ ~UD FILTRATE AT (~T): ~UD FILTRAT~ AT (~HT)~ ~UD CAKE AT (~T) 7788.0 4~54 0 900.0 TOOL NUMBER AMM-AA AME-AA 712 SGC-SA 60 CNC GA 0 NSC-E 775 DRS-C 4950 PGD-G 3764 C$R-J ~932 DIC-EB 377 DIS-MB 379 6 750 o 4 s42o DISPERSED 60 144.0 2,140 71.0 1,620 71.0 2.210 71.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL Or THERMAL)~ MATRIX: ~ATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): ~EMARKS: EPITHERMAL SANDSTONE 2,65 0,5 THIS FILE CONTAINS THE HI'RESOLUTION DATA FOR THE bDT, ~AIN PASS. ,75 IN RUBBER STANDOFFS AND 2' MOLE FINDER USED ON DIb, MATRIX:SANDSTOnE, ~)DEN=2 65 G/CC, HOLE CORRECTIOi~ = CALIPEr, 36' OF FILL ON BOTTOM IS Tape Veriflcat].om 5istlnq chlumberger AlasKa Computing Center 3-JUN-1994 10:14 BRIDGED AT 7314' ON FIRST ATTEMPT DOWNHOLE, $ # LIS FORMAT DATA PAGE~ 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB TYPE REPR CODE VALUE ! 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0~083 9 65 F~ l! 66 19 12 68 13 66 0 14 65 ~T 15 66 68 16 66 0 66 mmmmmmmmmmmmmmmmmm~mmmm#mm##mm ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API AP1 AP1 AP1 FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CLASS MOD NUmB SAMP EbEM CODE (HEX) DEPT FT 645252 00 000 00 0 3 i I 4 68 HPHN LDT PU 645252 O0 000 00 0 3 1 i 4 68 HDRH LOT . G/C3 6~5252 00 00O O0 0 3 1 1 4 68 HPEF LOT 645252 00 000 00 0 3 I I 4 68 HRHO LDT G/C3 45252 00 000 00 0 3 1 4 68 HNRH LDT G/C3 645252 00 000 00 0 3 ~ 4 68 HLL LOT CPS 645252 00 000 00 0 3 ! 1 4 68 HLU LOT CPS 645252 00 000 00 0 3 1 1 4 68 HLS LOT CPS 645252 00 0OO O0 0 3 1 i 4 68 HLIT LOT CPS 6~5252 00 000 O0 0 3 I I 4 68 H$$1 LOT CPS 645252 00 000 00 0 3 1 I 4 68 HDPH LOT PU 645252 00 000 O0 0 3 i i 4 68 HS$~ LOT CPS 645252 00 000 O0 0 3 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** IS Tape Verification bisting chlumberger AlasKa Computing Center DEPT. 7809.000 HPHN.LDT HRHO.LDT 2.148 HNRH.bDT HLS,[..DT 515.713 HLIT.LDT HSS2.LDT 364.429 DEPT 7000.000 HPHt'~.LDT HRHO:bDT 2,243 HNRH.LDT NbS.LOT 471.345 HLIT.~DT HSS?.LDT 368.478 DEPT. 6000.OOU HPHN.LDT HRHO bDT 2,340 HNRH,LDT HL$:LDT 387.14~ HLIT,~DT HSS~.LDT 342.~50 DEPT. 5000,000 HPHN.LD~ HRHO.LDT 2.284 HNRH.LDT ~LS,LDT 433,132 H~IT.LDT HSS2.LDT 349,788 DEPT. 41~9.667 NPHN.bDT HRHO.LDT 1.898 HNRH,LDT NbS.bDT 235,04] HLIT.LDT H$S2.LDT 142.935 END OF DATA **** FILE TRAILER ~$~ FILE NA~E : EDIT ,003 SERVICE : FDIC VERSION : 00~C0! D~TE : 94/06/ 2 MAX REC SIZE : I024 FIL~ TYPE : LO **** FILE HEADER F~LE NAME : EDIT ,004 SERVICE : FDiC VERSI~ : O0~CO! D~TE : 94/06/ 2 M~.X RFC SIZE : ~024 FILE TYPE : LO bAST FIL~ FILF ~{EADER FILE NOgBER 4 3-JUN-1994 10:14 30.409 MDRH.LDT 2.148 MDb.bDT b6.9~9 HS$1.bDT 25.573 HORS.bDT 2.~28 HLL.LDT 96.008 HSS1.LDT 20.133 HDRH.bDT 2.318 HLb. LDT 81.990 22.661 HDRM.DDT 2.276 HDb. LDT 113.738 HSSI~DDT 46.040 HDRH.LDT 1.890 Hbb.~OT 25.673 HSSI.LDT -0.009 255,241 264,2~9 0,021 250.391 279.727 0,007 205,992 263.338 O06 266,554 '0.738 . 1 HPEF.LDT HDU.LDT HDPH.LDT HPEF.LDT HhU.LDT HDPH.DDT HPEF.LDT HLU.LDT HDPH.LOT HPEF.LDT HLU.LDT HDPH.LDT HPEF.LDT HLU.LDT HDPH,LDT PAGEI 14 5 796 520~943 30,409 ¸78 5'~06 441, 24,642 4.821 362,308 18.768 22 04 21,760 237,440 45,566 IS Tape Verification Listing chlUm ergerb AlasKa Computing Center 3-JUN-1994 10:1~ PAGE~ 15 RAW OPEN HOLE MAIN PASS Curves and log header data for each run amd tool string in separate files; Tooi String_#l fo Sadlerochit run presented first (primary depth control'string used to depth sh ft the sadler interval) followed by files for other ma~n pass tool strings per run, RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: 2 DEPTH INCREMENT: 0,1667 FIbF SUPMARY VENDOR TOOL CODE START DEPTH CNTG 7809,0 $ ~OG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOG~ER ON BOTTOM: TD DRILLER (FT): TO LOGGER(FT)~ TOP LOG INTERVAL (FT): BOTTO~ LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH TOOL STRING (TOP TO BOTTOM) VENDOR TO05 CODE TOOL TYPE A~S-A AMS-A SGT-L CNT'G CNT~G LDT'D hDT-D LDT-O LDT-D DIT-E D!T-E $ AUX ~EA MECH SONDE AUX SEAS ELEC SONDE GAM~A R~Y CARTRIDGE COMP NEUTRON CART NEUTRON SOURCE NUCLEAR SERVICE CART DENSITY SONDE POWERED GAMMA DETECTOR GAMMA RAY SOURCE DUAL INDUCTION CART DUAL INDUCTION S~NDE BOREHOLE AND CASING DATA OPEN HOLE MIT SIZE (IN): DRILLERS CASING DEPTH LOGGERS CASING DEPTH ROREHObE CONDITIONS MUD TYPE: DENSITY (LB/G): VISCOSITY MUD PH: FLUID LOSS MAXIMUM RECORDED TE~PERATUR~ (DEGF): RESISTIVITY (OHMS) AT TEHPERATORE (DEGF): 29-APR-94 5C0-423 800 29-APR-94 1415 29-APR-94 7824,0 7788.0 4254.0 7778 0 oo.6 TOOL NUMBER AMM-.AA 712 AME-AA 712 SGC-SA 60 CNC-GA NSR-~ 229 NSC-E 775 DRS-C 4950 PGD-G ~764 GSR-J DIC-EB ~77 DIS-H5 379 6.750 4256.0 4254.0 WT, DISPERSED ~ 60 4~.0 9.5 144.0 I$ Ta~e Verification I, isting chlumberger AlasKa Computin~ Center 3-JON-1994 10:14 AT MEASURED TEMPERATURE (MT): AT BOTTOM HOLE TEMPERATURE FXLTRATE AT FILTRATE AT CAKE AT (MT) CAKE AT 2.140 1,620 2.210 71.0 71,0 71.0 ~EUTRON TOOb TOOL TYPE (EPITHERMAL OR THERMAL): MATR~X~ ~ATRIX DENSITY: HOSE CORRECTION (IN): EPITHERMAL SANDSTONE 2.65 # TOO[, STANDOFF (IN): 0.5 RE~ARKS: T~IS FILE CONTAINS T~E HI-RESOLUTION DATA FOR THE CNTG, MAIN PASS .7§ IN RUBBER STANDOFFS AND 2' HOLE FINDER USED ON DIL. MATRIX:SANDSTONE. MDEN:2,65 G/CC. HO~E CORRECTION = CALIPER. 36' OF FILL ON BOTTOM BRIDGED AT 73~4' ON FIRST ATTEMPT DOWNHOLE. $ LIS FORMAT DATA PAGE~ 16 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB *~ TYP~ REPR CODE V~bUE 1 66 0 2 66 0 3 73 28 4 66 5 66 '6 7 65 8 68 0 166 9 65 F~ 11 66 36 1~ 68 1] 66 0 14 65 FT 15 66 68 16 66 0 66 1 · IS Tame Verification Listing chlumberger AlasKa Computing Center 3-JUN-1994 10114 PAGE1 17 ** SET TYPE - CHAN ** NAMF SERV NiT SERV CE AP AP1 F E NUMB NUMB SIZE REPR PROCESS TD ORDER # LOG TYPE CLASS MOD NU"B SAMP ELEM CODE (HEX) ..................-.............,...,,....,.-.-.......-.....................-.......... DEPT FT 645252 OO 0 0 4 I 1 4 68 0000000000 RHNT CNT CPS 645252 O0 000 O0 0 4 1 1 4 68 0000000000 RHFT CNT CPS 645252 O0 000 O0 0 4 1 I 4 68 0000000000 HCNT CNT CPS 645252 O0 000 O0 0 4 I I 4 68 0000000000 HCFT CNT .CPS 645252 O0 000 O0 0 4 I i 4 68 0000000000 HTNP CNT PU 645252 O0 000 O0 0 4 1 I 4 68 0000000000 HNpO CNT PU 645252 O0 000 O0 0 4 1 1 4 68 0000000000 DATA D~PT. HCFT.CNT 7809.000 RHNT.CNT 766.104 HTNP,CNT DEPT. HCFT,CNT 7000.000 RHNT.CNT 478.740 HTNP,CNT DEPT, HCFT.CNT 6000.000 RHNT.CNT 654.091 HTNP,CNT D~PT, HCFT,CNT 5000.000 RHNT.CNT 809.100 HTNP,CNT DEPT, HCFT.CNT 4189.167 RHNT'CNT 376,797 HTNP.CNT END OF DATA 2239.475 RHFT.CNT 34.277 HNPO-CNT 1805.625 RHFT.CNT 48.687 HNPO.CNT 1997.204 RHFT,CNT 40.16] HNPQ,CNT 6 3 CNT 24~.9~8 RHFT. . HNPO~CNT 1580.450 RHFT,.CNT 48.989 HNPO.CNT 733 S68 HCNT,CNT 478 ~94 HCNT.CNT 49:774 585.840 HCNT.CNT 44:232 96 HCNT.CNT 293.697 HCNT.CNT 53.356 2204,942 1814.2,]1 2141.273 2572.732 1425.835 **** FILE TNAILER FILE NA~E : EDIT .004 SERVICE : FLIC VERSION : O0~CO1 DATE : 94/06/ 2 MAX REC $~ZE : 1024 FILE TYPE : LAST FILE IS Tape Verification Llstlnq chlumberger AlasKa Computinq Center 3-jUN-1994 10:14 PAGE: 18 **** FILE HEADER FILE NA~E : EDIT .005 SERVICE : FblC VERSIG~ : OOlCOi DATE : 94/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO FILE HEAOER FILE NUMBER 5 RA~ OPEN HOLE REPEAT PASS Curves and log header data for each run and tool string in separate files; Tool String Sadlerochit run presented first (~rimar¥ depth control string used to depth shift the Sadler interval) followed Dy files for o~her main pass tool strings~per run, RUN NUMBER: TOO[, STRING NUMBER; PASS NUMBER: 1 DEPTH INCREMEMT: 0,5000 FILE SUM~ARY VENDOR TOO[, CODE START DEPTH DI E LDT 7803,5 CNTG 7803.5 ~OG HEADER DATA DATE bOGGED: bO"LING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOO5 COOE TOOL TYPE A~$-A A~S-A SGT-L CNT-G C~T'G LDT-D LDT-D bDT-[). LDT-D OIT-E STOP DEPTH 6943.5 29-APR-94 5C0-42] 800 29-APR-94 I4~5 29-APR-94 788.0 4254,0 7778.0 900,0 AUX MEAS MECH SONDE AUX SEAS EbEC SONDE GAMMA RAY CARTRIDGE COMP NEUTRON CART NEUTRON SOURCE NUCLEAR SERVICE CART DENSITY SONDE POWERED GAMMA DETECTOR GAM~A RAY SOURCE DUAL INDUCTION CART TOOL NUMBER NE-AA 71 SGC~SA 60 CNC-GA 125 NSR F 2~ - 90 N$C-E 7 5 DRS-C 4950 PGD-G 3764 R-J 1932 ~C-~B 377 IS Tape Verification Listino chlumberger AlasKa Computing Center 3-JUN-1994 10:14 DIT-E $ DiIAL INDUCTION SONDE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH BOREHObE CONDITIONS MUD TYPE: MUO DENSITY (LB/G): MUD VISCOSITY CS): MUD FLUID LOSS MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): ~UD AT MEASURED TEMPERATURE (~T): MUD AT BOTTO~ HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT) MUD ~ILTRATE AT MUD CAKE AT MUD CAKE AT CENT): DIS-HB 379 6.750 4256.0 4254.0 WT,' DISPERSED !1,60 48,0 9,5 144,0 2,140 71.0 1.620 71,0 2,210 71,0 NEUTRON TOOL TOOL TYPE (EPITHER~AL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: SANDSTONE 2.65 O.S ,75 IN RUBBER STANDOFFS AND 2' HOLE FINDER USED ON LIt,, MATRIXmSAMDSTONE. MDEN=2~65 G/CC. HOLE CORRECTION = CALIPER, 36' OF FILL ON BOTTOM BRIDGED AT 7314' ON FIRST ATTEMPT DOWNHOLE. $ ~LIS FOR~T DATA 19 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE ! 66 0 2 66 0 3 73 264 4 66 1 5 66 6 73 I$ Tape Verification Llstlng chlumberger AlasKa Computing Center 3-jUN-1994 I0:14 PAGE: 2O mmmmmmmmmmmmmmmmmmmmmmmmmmmmm# TYPE REPR CODE VALUE 7 65 8 68 0,5 9 65 FT 11 66 3 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 mmmmmmmmm#mmmmmmmmmmmmmmmmmm#m SET TYPE - CHAN ,""',,'"'"'"'"'"'"'"'""""""'" ICE iPI AP1 APl API FILE NUMB ~ '''SIZE ~ PROCESS DEPT FT 645252 O0 000 O0 0 5 I 1 4 68 IIRD DTR NMHO 645252 O0 000 O0 0 5 I I 4 68 IIXD DYR MMHO 645252 O0 000 O0 0 5 1 I 4 68 IIR~ DTR MMHO 645252 O0 000 O0 0 5 ! 1 4 68 IIX~ DTR ~HO 645252 O0 000 O0 0 5 1 1 4 68 CIDP DTR MMHO 645252 O0 000 O0 0 5 I i 4 68 IDPH DTR OH~M 645252 O0 000 O0 0 5 1 I 4 68 ClMP DTR MNHO 645252 O0 000 O0 0 5 1 1 4 68 IMPH DTR OHM~ 645252 O0 000 O0 0 5 I I 4 68 IDQF DTR 645252 O0 000 O0 0 5 1 1 4 68 IMOF DTR 64525~ O0 000 O0 0 5 I I 4 68 ClSO DTR M~HO 64525 O0 000 O0 0 5 ! ! 4 68 ILD DTR OHM~ 645252 O0 000 O0 0 5 1 I 4 68 CIb~ DTR ~MHO 645252 O0 000 O0 0 5 I 1 4 68 ILM DTR OHMM 645252 O0 000 O0 0 5 ! ! 4 68 SFbU DTR OH~ 645252 OO 000 O0 0 5 ! I 4 68 SP DTR ~V 645252 O0 000 O0 0 5 1 I 4 68 TENS DTR LB 645252 O0 000 O0 0 5 I I 4 68 HTEN DTR LB 645252 O0 000 O0 0 5 1 1 4 68 MRES DTR OHM~ 645252 O0 000 O0 0 5 1 1 4 68 NTE~ DTR DEGF 645252 O0 000 O0 0 5 ! ! 4 68 GR DTR GAPI 645252 O0 000 O0 0 5 1 i ,4 68 TENS CNR LB 645252 O0 000 O0 0 5 1 1 4 68 HTEN CNR LB 645252 O0 000 O0 0 5 I t 4 68 MRES CNR OHMM 6~5252 O0 000 O0 0 5 I 1 4 68 ~TE~ CN~ DEGF 645252 O0 000 O0 0 5 1 I 4 68 CALl CNR IN 645252 O0 000 O0 ¢) 5 1 I 4 68 RTNR CNR 6~5252 O0 000 O0 0 5 ! 1 4 68 E~R~ CNR 645252 O0 000 O0 0 5 1 1 4 68 RCNT CNR CPS 645252 O0 000 O0 0 5 ! i 4 68 RCFT CaR CPS 645252 O0 000 O0 0 5 ! t 4 68 RCEN CNR CPS 645252 O0 000 O0 0 5 i t 4 68 RCEF CNR CPS 645252 O0 O00 O0 0 5 1 i 4 68 TNRA CNR 645252 O0 000 O0 0 5 i ! 4 68 CNTC CNR CPS 645252 O0 000 O0 0 5 ! i 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0§00000000 0 00000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 Tape Verification bisting 3-JUN-1994 10:14 chlumberqer AlasKa Computing Center PAGE: 21 CFTC CNEC CFEC NPHI GR TENS HTEN MTE~ DRHO LSRH RHOB $~RH bb SSi $$2 DPHI '~Z.~ ~.v ,,,""'"'"'"'"'"'"'"'" ~o. ~s~s~ oo ooo oo o ~D. ~/c~ s4s~s~ oo ooo oo o I.DR G/C3 645252 O0 000 O0 0 ~R c.s ~s~ oo ooo oo o ~=R c.~ ~4s~s~ oo ooo ooo up. c~s s~szs~ oo ooo ooo ~. c~s ~2s~ oo ooo ooo LDR IN 645252 O0 000 O00 ~ Pu ~s~s~ oo ooo ooo DATA IIXM:DTR 31.015 C .DTR 5.20.105 IDPH,DTR I~PH DTR 1.989 IDQF.DTR 0 000 IMQF,DTR XLD:DTR 1.909 CILM,DTR 501~974 IL~,DTR SP DTR '20.000 TEN$.DTR 1440-000 HTEN.DTR MTE~]DTR 141.450 GR,DTR 128,52~ TEN$.CNR MRES.CNR 0.961 ~TEM,CNR 14~.456 CALI,CNR ENRA.CNR 5.160 RCNT.CNR 2367.365 RCFT,CNR RCEF.CNR 610,799 TNRA.CNR 3.064 CNTC.CNR CN~C.CNR 3163.i21 CFEC.CNR 612.982 TNPH,CNR NPHI.CNR 3~.029 NPOR.CNR 36.802 GR.CNR HTEN.LDR 'i27.784 ~RE$,LDR 0.961 ~TEM.LDR LSR~ LDR 2.383 LURH.LDR 2.454 PEF.LDR OSS:I, DR 0.100 RHOB.LDR 2.456 SIRH.LDR SSHV.LDR 1213,014 5B.LDR 199,265 LU,LDR o 1 992 127~784 ~440,000 6 209 734 107 2330 861 36 802 128.521 141,456 20,570 2,214 308,605 E PROCESS' ~....!"~x) 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ....~~oooo IIR~.D~R CIM .DTR ,DTR MRES.DTR HTEN.CNR RTNR CNR RCEN]CN~ CFTC.CNR ENPH,CNR TENS.LDR DRHO.LDR QLS,LDR LSHV.LDR LS.LDR 462,746 502.'832 523.795 2,035 . 0,,96~ 1:27,~84 3,.~67 766,666 36'403 1440'000 0.078 0.t10 ~157.201 353.568 IS Tape Verification Listing chlu~berger AlasKa Computing Center LIT".LDR 62.334 SS1.LDR DP[{T.[.DR 11.75~ GR.LDR DEPT. 7000.000 IIRD.OTR IIXU.DTR 68,964 CIDP.OTR IMPH.DTR 1.463 IDOF.DTR ILD.DTR 1 425 CILM.DTR SP.DTR -27:063 TENS.DTR MTEM.DTR 133.599 GR.DTR MRES.CNR 0,975 MTEM.CNR ENRR.CNR 5.447 RCMT.CNR RCEF.CNR 507.884 TNRA.CNR CNEC.CNR 2672.264 CFEC.CNR NPHI.CNR 51.570 NPOR.CNR HTEM.LDR 890,983 MRE$.LDR LSRH.LDR 2.226 LURH,LDR O$S.LDR 0.050 RHOB.LDR $SHV.LOR 1215.190 LL.LDR LITH.LDR 107,325 SSi LDR DPHI.LDR 25-249 GR:LDR I X~DTR IMPN,DTR ILD.DTR SP DTR MTEM DTR ENRA CNR RCEF CNR CN C CNR NP~!CNR HTEN LDR SS}iv LDR blT~.LOR DPH!,LDR 6943.500 IIRD.DTR 36.i14 CIDP.OTR 1.478 IOQF,DTR 1,571 CILM,DTR -30,375 TEN$,DTR 132,437 GR.DTR 0.957 ~TEM.CNR 5.744 RCNT.CNR 433.129 TNRA.CNR ,72~ NPOR*C~R 881,521 MRE$,LDR 2,206 L~RH'LDR 0,074 RHOB,LDR 1214.410 LL,L~R 87.829 SSi,LDR 25.547 GR.bDR ** EMD OF DATA **** FILE FILE N~Mg SERVICE VERSION DATF MAX REC SIZE FILE TYPE LAST FILE TRAILER **** : EDIT ,005 : FblC : O01CO1 : 94/06/ 2 : ~024 : bO 3-JUN-1994 10:14 286.635 SS2.LDR 128.521 534.786 IIXD.DTR 690.681 IDPH.DTR 0.000 IMQF.OTR 672.591 ILM.DTR 3400.000 NTEN.DTR 116.166 TENS.CNR 133.599 CALI.CNR 1823.798 RCFT,CNR 3.804 CNTC,CNR 490.600 TNPH,CNR 47.363 GR,CNR 0.975 MTEM,~DR 2.236 PEF,LDR 2.233 $1RH.LDR 252.164 LO.LDR 275.697 SSI.LDR 116.166 333.042 IIXD.DTR 692.030 IDPH,DTR 0 000 IMQF.DTR 634 442 ILM,DTR 3470 000 HTEN.DTR ~204 380 TENS'CNR 132 437 CALI,CNR 1705.869 ~CFT~.CNR ].940 CNTC,CNR 432.603 TNPH'CNR 48.774 GR'CNR 0,957 MTEM~DR 2.212 PEF,bDR !i~ 8 SlRH,~DR 25 69 LU~bDR 341.417 124.289 1.448 0.000 ,o :ooo 224 453.375 1786.228 47.638 116,i~6 133.599 4.456 2,177 446,799 365.565 75.348 1.445 0.000 1 576 88t 521 3470 000 6 536 418 435 i828 014 47 947 204.380 13~ 437 183 2.125 464,553 365°359 CALI.LDR IIRM.DTR CIMP.DTR CILD.DTR SFLU.DTR MREM.DTR HTEN.CNR RTNR.CNR RCEN.CNR CFTC.CNR ENPH.CNR TENS.LDR DRHO.LDR QLS.LDR LMHV,LDR L$.LDR CALI.LDR IIRM.DTR CIMP.DTR CILD.DTR SFLU,DTR MRE$,DTR HTEN'.CNR RTNR.CNR RCEN.CNR CFTC,CNR ENPH.CNR TENS.LDR DRHO,LDR OLS*LDR LSHV,LDR bS.LDR CALI.LDR PAGE: 22 6,209 613.303 68 1.366 o 975 ~508 2O6 479 604 39 528 3400,0O0 o o12 -0 036 1161.717 475.563 6.224 357.897 676,538 636.472 3.242 0,957 88t,52! 4,226 2330,7!1 459,372 42.~88 3470*000 4 145 IS Tape Verlflcatfon Listing chlumberqer AlasKa Computing Center 3-JUN-1994 10:14 PAGE: 23 FILF ~E : EDIT ,006 VER~t::d : O01CO1 DAT~ ~ 9~/06/ 2 ~AX REC SIZ~ : 1024 FILE TYPE : LO L~$T FILE ~ FILF HEADER FILE NUMBER 6 R~ OPEN HOLE REPEAT PASS Curves and log header data for each run and tool string in separate files; Tool String Wl fo Sadlerochit run presented first (primary.depth control string used to depth shift the Sadler ~nterval) followed by files for other main pass tool strings per run, RUN NtIMBER~ 1 TOOL STRING NUMBER: 1 PASS NUMBER: DEPTH INCREMENT: 0.0833 ~Ib~ SUmmARY VENDOR TOOL CODE START DEPTH LDT 7803.5 $ L..,.G HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER TD LOGGER(FT), TOP bOG INTERVA~ (FT): BOTTOM LOG INTERVAL (FT)~ LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE A~$-A A~S-A CMT-G CNT-G LDT-~ LDT-D LOT-D LDT-D DIT-E DIT-E $ STOP DEPTH 694~,7 29-APR-94 5C0-423 800 29-APR-g4 14t5 29-APR-94 7824.0 7788.0 4254,0 7778.0 900,0 NEUTRON ~OORCE TOOL NUMBER AMS-AA 712 AME'AA 712 SGC-SA 60 C,C-GA 125 NSR-F 2290 NSC-E 775 DRS-C 4950 PGD-G 3764 GSR-J t932 DIC-EB 377 DIS-MB 379 IS Tape Verification I, isting chlumberger AlasKa Computing Center 3-JUN-1994 10114 PAGE~ 24 80REHOLE AND CASING DATA OPEN HOLE BIT SIZE [)~ILLERS CASING DEPTH~eT): LOGGERS CASING DEPTH ROREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S)~ MUD FLUID LOSS (C3): MAXiaUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~M) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT~ MUD AT BOTTOM HOLE TEMPERATURE ~UD FILTRATE AT (MT): MUD FILTRATE AT (BHT): ~UD CAKE AT (MT) ~UD CAKE AT NEUTRON TO0~ TOOL TYPE (EPITHERMAL OR THERMAL): ~ATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 4 56.°0 4254,0 WT, DISPERSED 11.60 4~,0 9,5 144.0 2,140 71,0 1,620 71,0 2.210 71.0 EPITHER~AL SANDSTONE ~,65 # TOOL STANDOFF (IN)! 0.5 # RE~ARKS: THIS FILE CONTAINS THE HI-RESOLUTION DATA FOR THE bDT, REPEAT PASS" ,75 IN RUBBER &TANDO~FS AND 2' HOLE FINDER USED ON DIL, MATRIX=SANDSTONE, MDEN=~.65 G/CC MOLE CORRECTION = CALIPER..~ ' 36' OF FILL ON BOTTOM BRIDGED AT 73~4' ON FIRST ATTEMPT DOWNHOLE. $ LIS FOR~T DATA DATA FORMAT SPECIFICATION RECORD SET TYPE - 64gE ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 chlumberg,r AlasKa Computin~ Center 3-JUN-1994 I0:14 PAGE~ 25 ##mm#mmmmmmmmmmmmmmmmmmmmmmmm! TYPE REPR CODE VALUE 7 65 9 65 ~1 66 19 12 68 13 66 0 14 65 FT 15 66 68 ~6 66 0 66 I mmmm#mmmmmmmmmmmmmmmmmmmmmmmmm SET TYPE - CHAN ~ CE A I ~P ORDER # DEPT FT 645252 HPHN LDR PU 645252 HDRH LDR G/C3 645252 HPEF LOR 645252 HRHO LDR G/C3 645252 HNRH LD~ G/C3 645252 HLL LDR CPS 645252 HLU LDR CPS 645252 HLS LDR CPS 645252 HLIT LDR CPS 645252 HSS1 LDR CPS 645252 HDP~ LDR PU 645252 HS$2 LDR CPS 645252 O0 000 O0 0 6 ! O0 000 O0 0 6 1 O0 000 O0 0 6 I 1 O0 000 O0 0 6 1 1 O0 000 O0 0 6 1 O0 000 O0 0 6 1 1 O0 000 O0 0 6 1 O0 000 O0 0 6 1' 1 O0 000 O0 0 6 1 O0 000 O0 0 6 1 I O0 000 O0 0 6 i O0 000 O0 0 6 I 1 O0 000 O0 0 6 1 PI~ FILE NUMB NUMB SIZE REPR C OD NUMB SAMP ELEM CODE (HEX) 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 DEPT 7803.500 HPH~.bDR 11.756 HDRH.bDR HRHO:LDR 2.456 H'NR..LDR 2.456 HLS.LDR 353.565 HbIT.bDR 62.334 HS$2.LDR 341.417 DEPT. 7000.000 HPHN.bDR 24.981 HDRH.bDR HRHO.LDR 2.247 HNRH'LDR 2.238 HLb.bDR HLS.bDR 472.190 HbIT.LDR 108,521 HSSI'~DR HS$2.LDR 365.41,1 DEPT. 6943.667 HPHN.LDR 24.787 HDRH,LDR HRHO.LDR 2.234 HNRH.LDR 2.241 HLb.bDR HbS.LDR 488.791 HblT.LDR 94.477 HSSI.LDR HSS2.LDR 368.923 0,.078 HPEF,bDR 199 ~65 HbU,bDR 286~ 35 HDPH.LDR 0.021 HPEF [,.DR 248~195 HbU:LDR 2791556 HDPH..LDR 0.043 HPEF.LDR 258.516 HbU.LDR 289..501 HDPH.LDR 21,259 308,605 11'756 4.47, 24.. 5.897 460'552 25'2! 3 IS Tare Verification Listing chlumberger AlasKa Computing Center 3-,1UN-1994 i0:14 PAGES 26 ** END OF DATA **** FILE TRAILER FILE NA~E : EDIT .006 SERVICE : FLIC VERSION : OOICO1 DATE : 94/06/ 2 MAX REC SIZE : 102i FILE TYPE ~ LO *~ FILE HEADER ~*~ FILE NA~E : EDIT ,007 SERVICE : FLIC VERSION : OOICO1 DATE : 94/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO hAST FILE : FILE }{EADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASS Curves and log header data for each_run and tool string in separate files; Tool String #! fo Sadlerochit run presented first (primary_depth control string used to depth sh!ft the Sadler interval) followed bY files for other main pass tool strings per run, RUN NUMBER~ 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0,1667 ~I~E SUMMARY VENDOR TOOL CODE START DEPTH CNTG'''''''''''''''' ''''~''''780 $ ~OG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TiME CIRCULATION ENDED: TIME LOGGER ON 8OTTOM~ TO DRILLER eFT): TO LOGGER(FT): TOP LOG INTERVA~ (FT): BOTTOM hOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 6943,2 29'APR'94 5C0'423 800 29'APR'94 i415 29-APR-94 7824 0 7788i0 4254 0 7778 0 9oo.6 IS Tame Yer~ficatlon Listing chlumberger AlasKa Computinq Center 3-JUN-1994 10:t4 PAGE: 27 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE AMS-A SGT-b CNT-G CNT-G bDT-O bDT-D bDT-D bDT-D DIT-E DIT-E $ mmmmmmmmm AUX ~AS MECH SONDE AUX MEAS EbEC SONDE GAMMA RAY CARTRIDGE COMP NEUTRON CART NEUTRON SOURCE NUCLEAR SERVICE CART DENSITY SONDE POWERED GAMMA DETECTOR GAMMA RAY SOURCE DUAL INDUCTION CART DUAL INDUCTION SONDE BO~EMOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH LOGGERS CASING DEPTH (FT): # BOREHObE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY PH: FLUID LOSS NEUTRON TOOU TOOL TYPE (EPITHERMA5 OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECT~ON (IN): TOOL NUMBER mom~mm~m AMS-AA 7~2 AME-AA 7~2 SGC-$A 60 CNC-GA NSR-F ~290 ~SC-E 775 DRS-C 4950 PGD-G 3764 GMR-J 1932 DIC-EB 377 DIS-HE 379 6,750 4256.0 4~54.0 WT, DISPERSED ~1,60 9,5 ~44,0 2,140 71.0 1,620 71.0 2'210 7~.0 EPITHERMAb SANDSTONE 2,65 TOOL STANDOFF (IN): 0.5 # REMARKS: THIS FiLE CONTAINS THE HI-RESOLUTION DATA FOR THE CNTG, REPEAT PASS. .75 IN RUBBER STANDOFFS AND 2' MOLE FINDER USED ON DI5, MATRIX=SANDSTOhE~~ ~ ~MDEM=2 ~$ G/CC HOLE CORRECTION ~A~IPE~. 36' OF FILL ON BOTTOM BRIDGED AT 7314' ON FIRST ATTEMPT DOWNMOLE, $ LIS FORMAT DATA IS Tape Verification Listing Chlumberger AlasKa Computing Center 3-JUN-1994 10:!4 PAGE: 28 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE YAbUE I 66 0 2 66 0 3 73 28 4 66 5 66 ~ 73 7 65 8 68 0.166 9 65 Fi 11 66 36 1~ 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 I ** SET TYPE - CMAN ** NAME SERV UNIT SERVICE AP1 API AP1 AP1 FILE NUMB NUMB SIZE REPR P~OCES~ ID ORDER # ~OG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) .............,,-...-....-.--..-.........-.----...-.,-----,---.-...--.-...---...----.... DEPT 645252 O0 000 O0 0 7 4 68 0000000000 RHNT CNR CPS 645252 O0 000 00 0 7 1 1 4 68 0000000000 R~FT CNR CPS 645252 00 000 00 0 7 i i 4 68 0000000000 HCNT CNR CPS 645252 O0 000 00 0 ? 1 1 4 68 0000000000 HCFT CNR CPS 645252 O0 000 O0 0 7 1 I 4 68 0000000000 HTNP CNR PU 645252 O0 000 00 0 7 I I 4 68 0000000000 HNPO CNR Pi] 645252 O0 000 00 0 7 1 1 4 68 0000000000 ** DAT~ ** DEPT. 7803,500 RHNT~CNR HCFT.CNR 766.i04 HTNP.CNR D~PT 7000,000 RHNT.CMR HCFT:CNR 476,454 ~TNP.CNR DEPT. 6943.167 RHMT.CMR HCFT.CNR ~59.090 HTNP.CNR 2367.365 RHFT,CNR 36.837 HNPO,CNR 029 · HNPO,CNR 1771.062 RHFT.CNR 47.958 HNPO.CNR 733.558 HCNT,CNR 36.837 427 679 HCNT,CNR 47:775 427,.679 HCNT.CNg 51,530 2330,861 1786,108 1826,7 39 ** END OF DATA ** IS TaDe Verification Listing chlumberger AlasKa Computing Center 3-JU~'-1994 10:14 PAGE: 29 ~ FILE TRAILER ~ FIb~ N~ME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATF : 94/06/ 2 ~X REC SIZ~ : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER SERVICE NAME ~ EDIT DATF : 94/06/ 2 ApE NA~E : 93429 CONTINUATION # : ! PREVIOUS TAPE : COMMENT : ARCO ALASKA INC., KUPARUK RIVER, IY-31, 500292238100 **** REEL TRAILER SERVICE NAME : EDIT DATE ! 94/06/ 2 ORIGIN : W6IC REEL NAME : 93429 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC., KUPARUK RIVER, lY-31, 500292238100