Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout194-059.
XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
/¢/g,/..~.~ File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures-, graphs, charts-
Pages:
Poor Quality Original - Pages:
D Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS:
Scanned by: Beverly Diann<~~ Nathan Lowell
Date:~///'~
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: ~si
"'-" STATE OF ALASKA "~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 194-059 303-049
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22470-00
4. Location of well at surface 9. Unit or Lease Name
551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM X = 681483, Y = 5998032 Point Mclntyre
At top of productive interval
3808' SNL, 444' EWL, SEC. 13, T12N, R14E, UM X = 686055, Y = 5994885 10. Well Number
At total depth P2-54
3954' SNL, 615' EWL, SEC. 13, T12N, R14E, UM X = 686230, Y = 5994743
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Point Mclntyre
KBE = 45.62' ADL 034624
12. Date Spudded 04/29/1994 113' Date T'D' Reached 114' Date C°mp" Susp"'~r Aband' 115' Water depth' if °ffshore 116' NO' of Completions 05/10/1994 3/7/2003 N/A MSL Zero
17. Total Depth (MD+'I'VD)118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
11180 9141 FTI 11080 9059 FTI [] Yes [] NoI N/A MDI 1750' (Approx.)
22. Type Electric or Other Logs Run
GR / NEU / DEN / RES / LWD
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 30' 110' 30" 260 SX Arctic Set (Approx.)
10-3/4" 45.5# NT80LHE 35' 3940' 13-1/2" 1166 sx CS III, 375 sx Class 'G'
7-5/8" 29.7# L-80 / 13Cr 31' 11164' 9-7/8" 590 sx Class 'G'
5-1/2" 17# L-80 5726' 10556' Scab 219 sx Class 'G'
24. Perforations open to Production (MD+'I'VD of Top and 25. TUBING RECORD
Bottom and interval, size .a. nd.n~.u~m_ber) .------ SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, 9Cr 5666
MD TVD MD TVD 3-1/2", 9.2#, 13Cr 10500' 5711' & 10500'
26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMO, IJ~I~ KIND OF MATERIAL USED
10680' P&A witH' 20 .l~ls of Class 'G' cement
2003
on topk-o~and( '~" plug of 4000# of 20/40
Carbolite.
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO
TEST PERIOD
I
FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core c~p.s.,~.
No core samples were taken.
Form 10-407 Rev. 07-01-80
ORIsiNAL
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered and
Marker Name
Depth Depth gravity, GOR, and time of each phase.
H RZ 10707' 8756'
Kalubik 10769' 8805'
Kuparuk 10789' 8821'
NEP NAY 6 2003
$]. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
82. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubb,e ~'~~ Title TechnicalAssistant Date ~S"aT'"O~
--
P2-54 194-059 303-049 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. D#l/ing Engineer: Mark Johnson, 564-5666
INSTRUCTIONS
GENE~AL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
IT£M 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Well: P2-54A Accept: 03/17/03
Field: Point Mclntyre Spud: 03/20/03
APl: 50-029-22470-01 Release: 03/27/03
Permit: 203-030 Rig: Nordic #1
Date : :::::~:: ..
PRE-RIG WORK
02/15/03
PPPOT-T PASSED TO 5000 PSI. (PRE-CTD) FMC CHECKED AND TORQUED ALL THE TUBING HANGER LDS
TO 650 FT-LBS.
02/17/03
T/I/O = 2040/60/20. MONITOR WHP'S AND OA FL. (PREP FOR MITOA). OA FL NEAR SURFACE.
02/22/03
T/I/O 2040/650/0. MIT - OA TO 2000 PSI PASSED. (PRE CTD). OA FL NEAR SURFACE. PRESSURED OA TO
2000 PSI WITH 6 BBLS OF DIESEL. STARTED 30 MIN TEST. OA LOST 300 PSI IN 15 MIN. RE-PRESSURED
OA TO 2000 PSI. OA LOST 30 PSI IN 15 MIN AND A TOTAL OF 40 PSI IN 30 MIN. BLED OA TO 0 PSI. FINAL
WHP'S = 2040/650/0.
02/23/03 ,5CANNED 8 2003
T/I/O- 2250/720/50. MONITOR WHP'S POST MIT-OA.
02/28103
WELL SI ON ARRIVAL. RAN FLAPPER CHECKER. VALVE PARTIALLY CLOSED @ 3500# CL PSI. STROKED
TRSV, CHECKED OUT OK @ 5000# CL. DRIFTED W/2.50" CENT. TO 10991' SLM - ((CORRECTED DEPTH =
11,015')) (SAMP BLR EMPTY). SET DOWN @ 10504' WLM BUT ABLE TO WORK FREE. LEFT WELL SI.
03/02/03
RIH W/JET BLASTER TO 10,700'. PUMP BEADS THROUGH JET BLASTER FROM 10,700' TAG DEPTH OF
11,039' MAKING 2 PASSES THROUGH INTERVAL. POOH @ 80%. FREEZE PROTECT TBG TO 2000' WITH
MEOH. FREEZE PROTECT FLOW LINE. UNABLE TO RIG DOWN DUE TO HIGH WINDS. DECIDE TO MILL XN
NIPPLE. RIH WITH WFD 2 3/8" PDM MOOR & 2.80" DIAMOND SPEED MILL. TAG X-NIPPLE (2.813") AND MILL
THROUGH (8 STALLS).
03/03/03
MILL X-NIPPLE @ 10478' W/2.80" DSM. RIH AND START MILLING XN NIPPLE, HAD ONE STALL TO 2400 PSI
AND DID NOT SEE ANY MORE MOTOR ACTION. RIH AND TAG 52' HIGH. APPEARS TO HAVE BACKED OFF
THE qT. POOH. HIT TIGHT SPOT - 10,500' (10K OVERPULLS). MILLED THROUGH THIS SECTION AND
SEEMED TO CLEAN UP (PACKER ID 2.78" W/2.8" MILL, "2.79" DRIFT"). POOH. MU PDS MEMORY GR/CCL.
RIH TAG HIGH AT 10807' CTMD, ATTEMPT TO WORK PAST WHILE PUMPING DOWN THE COIL WITH OUT
SUCCESS. LOG FROM 10807' CTMD TO 9000', POOH. CORRECT TAG IS 10,819' ELMD, INTERPRETATION
OF THE COLLAR LOG INDICATES THAT THE TAILPIPE SWIVELED OFF 10' BELOW THE PACKER. RIG
DOWN. WELL IS FREEZE PROTECTED TO 2000' WITH 60/40 MEOH. JOB COMPLETE.
O3/O4/O3
D&T WITH 2.77" CENT TO 10835, CALIPER LINER FROM 10800' TO 9546', PULLED SO GLV FROM STATION
#5, PULL LGLV FROM STATION #3.
03/05/03
SET DGLV'S AT STATIONS #1,3, 5, GLM'S. LOADED IA WITH 60/40 & CRUDE, MITIA PASSED TO 2500 PSI.
BLED IA TO 0 PSI. SHUT IN.
03/06/03
CHANGE PROGRAM AND ADD LOGGING RUN TO Tr. RIH W/LOGGING TOOLS.
P2-54A, Coil Tubing Drilling
Page 2
03/07/03
RIH W/LOGGING TOOLS. LOG FROM TOP OF TT @ 10,808' TO 10,400' CTMD. CORRECT DEPTH OF TOP
OF'l-r= 10,826'. RIH W/2.5 BALL DROP NOZZLE. LAY IN 4000 # OF 20/40 CARBO~D 13 BBLS OF
NEAT 17 PPG CEMENT AND 7 BBLS WITH 15 PPB AGGREGATE FOR A TOTAL ~LS. ACHIEVE 2
BBLS BEHIND PIPE.MAKE THREE PASSES WITH BIOZAN TO CLEAN HOLE FRO~00' TO 10660' (TOC).
POOH WASHING ALL GLM'S MANDRELS. WASH TREE AND BOP'S. FREEZE PROTECT TUBING WITH 40
BBLS 60/40 METHANOL. JOB COMPLETED.
03/12/03
RUN 2.5" CENT TAG CEMENT @ 10680'SLM. PT TBG TO 1000 PSI - GOOD TEST. TURN WELL OVER TO
DSO. WELL TO REMAIN SHUT IN FOR CTD.
03/13/03
VALVE SHOP TESTED THE MV, SV, AND WV TO 3500 PSI. OK.
03/14/03
TIO= 800/600/0 BLEED TBG & IA TO 0 PSI (PRE- CTD). BLED TP & lAP TO 0 PSI; ALL FLUID. FINAL WHPS=
0/0/0.
ARCO Page 1 ~
Operations Summary Report
Legal Well Name: P2-54
Common Well Name: P2-54 Spud Date: 4/18/1994
Event Name: REENTER+COMPLETE Start: 3/12/2003 End: 3~28~2003
Contractor Name: NORDIC CALISTA Rig Release: 3~27~2003
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
311712003 00:00 - 02:00 2.00 BOPSUR P PRE Accept rig at 00:00 on 311712003. NU BOP.
02:00 - 03:00 1.00 BOPSUR P , PRE Install ddp pan. MU 2" test joint. Take on fluid.
03:00 - 10:00 7.00 BOPSUR P PRE Test BOPE to 250 / 3,500 psi as per BP policy and AOGCC
regulations. Witness of test waived by Chuck Scheeve of
AOGCC. Top 2" combo rams not holding. Inspect rams and
verify deminsions. Switch rams to other cavity & re test OK.
Continue testing BOPE. Meanwhile R/U hard line to reel &
changeout injector gripper blocks for 2" CT.
10:00 - 11:00 1.00: S'I'WHIP P WEXlT P/U injector. M/U packoff. Prep to stab CT. Meanwhile BHI
MWD checking out their tools.
11:00 - 11:15 0.251 STWHIP P WEXlT Held PJSM for stabbing CT.
11:00 - 13:00 2.00! STWHIP P WEXIT Pull coil from reel across pipe shed roof. Install depth counter &
stab CT thru gooseneck & injector. DS tech building a depth
encoder connector for tieing BHI MWD depth encoder to the rig
depth tracking system -,. the one used on the last 2" CT job is
missing.
13:00 - 13:45 0.75 STWHIP P WEXlT Cut coil. GBR welder install DS weld-on CTC (ID = 0.996").
Round off weld to ensure no square edges catching on TT. Pull
test to 22k ~ OK.
13:45 - 14:45 1.00 STWHIP P WEXlT Press test hardline & inner reel valve to 3500psi ~ OK. Install
dart catcher. Load wiper dart. Launch & chase/fill CT with 3%
KCL. Dart hit @ 36bbls. Dart stuck @ CTC.
14:45 - 15:45 1.00 S'I'WHIP N MISC WEXIT Cut coil & weld-on another CTC (ID = 1.05"). Pull test to 22k ~
OK. Test CTC to 3500psi ~ OK. Baker confirms that dart for
cement job is slightly different from the one pumped. Will have
to pump another dart to confirm it can pass'thru the 1.05" ID
CTC before the cement job.
15:45 - 16:00 0.25 STWHIP P WEXlT !Open up well, bleed off WHP & monitor ~ obserVe 0psi WHP.
BHI hook up their MWD transducer to CT hardline.
16:00 - 16:30 0.50 S-I'WHIP P WEXlT Held pre-operations safety meeting. Reviewed well plan,
potential hazards & BHA M/U procedure. Emphasize strict
adherence to procedures.
16:30 - 18:00 1.50 STWHIP P WEXIT M/U cement milling BHA #1 with 2.74" HC D331 mill, 2-3/8"
motor with 1.75deg ABH, GR-DIR MV~.D,,j.'.30~d.e,g,~ orienter, 2 jts
of 2-1'16" t~~'
18:00 - 18:30 0.50 STWHIP P WEXlT Crew change & pre tour safety meeting.
18:30 - 22:30 4.00 STWHIP N WAIT WEXIT Wait on BHI to get depth encoder.
22:30 - 23:00 0.50 S'I-WHIP ~ WEXIT MU injector to BHA. RIH. Flow test MWD.
23:00 - 23:45 0.75 STWHIP N DFAL WEXIT MWD not reading pressure. Trouble shoot MWD. Change
3ressure transducer.
23:45 - 00:00 0.25 STWHIP ~ WEXlT Flow test MWD. RIH.
3/18/2003 00:00 - 01:30 1.50 STWHIP :) WEXlT RIH to 8,000'.
01:30 - 03:00 1.50 STWHIP :) WEXIT Calibrate MWD depth.
03:00 - 03:20 0.33 S'I'WHIP :) WEXIT RIH. Tag cement top at 10,677'.
03:20 - 05:00 1.67 STWHIP :~ WEXlT Pull up hole to 10,577'. Log down for tie in. Add 10'.
05:00 - 05:30 0.50 STWHIP :) WEXlT Orient TF to LS. Retag TOC @ 10687'.
05:30 - 05:35 0.08 STWHIP :~ WEXlT Start LS pilot hole. Mill cement to 10689' with 175R TF,
1.5/1.5bpm, 2760/3040psi, 2k WOB & 24fph ave ROP.
05:35 - 06:25 0.83 STWHIP :~ WEXlT Orient 2 clicks. Reorient to 180.
06:25 - 06:30 0.08 STWHIP :) WEXlT Mill cement to 10691' with 150R TF, 1.5/1.5bpm, 2800/3000psi,
2k WOB & 10fph ave ROP.
06:30 - 06:55 0.42 STWHIP :) WEXIT Orient 1 click & mill cement to 10697' with 180 TF, 1.5/1.5bpm,
2800/3000psi, 2k WOB & 14fph ave ROP. TF walking to the
Printed: 3/31/2003 11:01:32 AM
ARCO page 2 ~
OperatiOns summary ,Report
Legal Well Name: P2-54
Common Well Name: P2-54 Spud Date: 4/18/1994
!Event Name: REENTER+COMPLETE Start: 3/12/2003 End: 3~28~2003
Contractor Name: NORDIC CALISTA Rig Release: 3~27~2003
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Code NPT PhaSe DescriptiOn :of operations::
::
3/18/2003 06:30 - 06:55 0.42 STWHIP P WEXiT right.
06:55 - 08:15 1.33 STWHIP P WEXlT Orient 1 click & mill cement to 10716' with 150L-180 TF,
1.5/1.5bpm, 2800/3000psi, 2k WOB & 14fph ave ROP.
08:15 - 08:25 0.17 STWHIP N DEAL WEXlT MWD quit pulsing. Resync MVVD tool.
08:25 - 09:25 1.00 STWHIP P WEXlT Odent TF to 180. Meanwhile observe GRAX reading maxed out
ca 250APl ~ could be due to scale or tool failure. Decide to
retie-in to check if tool is still working OK.
:09:25 - 09:35 0.17 STWHIP P WEXlT PUH to 10570' & observe GR reading normal. Still decide to
retie-in to be absolutely sure of our depths.
09:35 - 11:00 1.42 STWHIP P WEXlT Log down @ 45fph & tie-into GR marker using SWS 03/07/03
GPJCCL correlation log. Had -1' correction. However GR is ca
20 APl hotter.
11:00 - 11:15 0.25 S'I'WHIP P WEXlT PUH intoTT @ 10421' ~ observe no restrictions. Resync MWD
tool & RBIH.
11:15-12:55 1.67 STWHIP P WEXlT Mill cement to 10750'with 150L-180 TF, 1.5/1.5bpm,
3000/3430psi, 2k WOB & 20fph ave ROP. GR reading normal
again. MWD tool pulsing intermittently. Decide to increase rate
& see if it can steady-up the tool. Freespin @ 1.8bpm =
3600psi
12:55 - 14:15 1.33 STWHIP P WEXlT Mill cement to 10770' with 150L-180 TF, 1.8/1.8bpm,
3600/3800psi, 2k WOB & 15fph ave ROP. Loosing fluid over
shakers. Meanwhile audit team carryout ISO 14001 EMS
maintenance audit on rig ~ once again passed with flying
colors.
14:15 - 14:30 0.25 STWHIP! N DFAL WEXlT MWD quit pulsing.-PJ, J._.H_~to__ 10600' to resync MWD tool.
Troubleshoot & try several flow ratesTchec, k transducer ~ no
luck.
14:30- 16:30 2.00 STWHIP N DEAL WEXlT POOH forMWD.
16:30 - 18:45 2.25 STWHIP N DFAL !WEXlT OOH. S/B injector. Flush BHA. Retrieve MWD probe & observe
pulser plugged with green tape & some debris. Function test
r~.D. probe& reinstall. M/U coil & injector.
2.25 STWHIP N DEAL WEXlT I~H~l~'~-I~R~/~j3~er~. 2_.~ro. irJSHT. RIH
18:45-21:00
21:00- 21:55 0.92 STWHIP N DFAL WEXlT Log tie-in------ '~'down fro~q~6~'-~)d~{~,~
21:55 - 22:10 0.25 STWHIP N DEAL WEXlT RIH and tag TD at 10770'
22:10 - 22:30 0.33 STWHIP N DEAL WEXlT Orient to Iow side from 150R
22:30 - 23:40 1.17 STWHIP P WEXlT Mill cement Iow side from 10770' 1.5/3500/180R 20-30'/hr 1-2k
WOB 100~ diff to 10799'
23:40 - 00:00 0.33 STWHIP P WEXlT PUH to 10680'. Orient to high side
311912003 00:00 - 01:30 1.50 STWHIP, P WEXlT Continue to orient to high side-weak odentor and slow BHI
detection of signal
01:30 - 02:00 0.50 STWHIPIP WEXlT Mill cement HS 10799-808' 1.5/3500/15L
02:00 - 03:20 1.33 STWHIP!P WEXlT POOH for window mill assy
03:20 - 04:05 0.75 STWHIP P WEXlT ~LD pilot mill and motor. MU window milling assy
04:05 - 06:20 2.25 STVVHIP P WEXlT RIH w/BHA #2 (2.74" WM, 2.5 deg motor)
06:20 - 06:35 0.25 STWHIP P WEXlT Corr +10' at 10600'. Chk TF 150L. Orient to 15L. S/D pump.
06:35 - 06:40 0.08 STWHIP P WEXlT RIH. Saw slight bobble @ top of pilot hole. Tag csg wall @
10808'.
06:40 - 06:50 0.17 STWHIP P WEXlT P/U 10'. Check TF ~ 60R. PUH to 10750'.
06:50 - 07:25 0.58 STWHIP :) WEXlT Orient TF around to 15L. S/D pump.
07:25 - 07:40 0.25 STWHIP :) WEXlT RBIH to 10804'. Bdng on pumps to 1.Tbpm/3550psi. Zero
WOB @ 11.2k down wt. TF @ 5L. Tag & see MW @ 10805'.
Correct to 10808'. Flag pipe & P/U 1'. TF @ 10L.
07:40 - 12:13 4.55 STWHIP :) WEXlT Start time milling window as per time schedule. Mill to 10808'
Printed: 3/31/2003 11:01:32 AM
ARCO Page 3 ~
Operations Summary"Report .........
Legal Well Name: P2-54
Common Well Name: P2-54 Spud Date: 4/18/1994
Event Name: REENTER+COMPLETE . Start: 3/12/2003 End: 3~28~2003
Contractor Name: NORDIC CALISTA ~t~~~~L~03
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
311912003 07:40 - 12:13 4.55 STWHIP P WEXlT with 10-5L TF, 1.6/1.6bprn, 3450psi, Ok WOB.
12:13 - 15:29 3.27 STWHIP P WEXlT Mill to 10808.1' with 5L TF, 1.6/1.6bpm, 3450psi, Ok WOB.
Stall lx @. P/U to string wt & get out of stall. Continue milling
to 10809' with 15L TF, 1.611.6bpm, 3450psi, 0-2k WOB.
15:29 - 17:12 1.72 STWHIP P WEXlT Mill to 10810' with 15-2L TF, 1.6/1.6bpm, 3750/3920psi, 0-2k
WOB. Seeing metal shavings on the shaker.
17:12 - 18:25 1.22 STWHIP P WEXlT Mill to 10810.8' with 2L TF, 1.611.6bpm, 3750/3920psi, 0-2k
WOB. Stall 2x. P/U & get out of stall. Looks like we're out.
18:25 - 20:40 2.25 STWHIP P WEXlT Drill open hole at 8'/hr to 10814.8' and stack 6k 1.4/3200/10R.
Wiper back thru window and resumed making hole, albeit slow.
Drill to 10820'. Window depths (for now) are 10808-811'
20:40 - 22:10 1.50 STWHIP P WEXlT Wiper back thru OH and window. POOH for tapered mill
22:10 - 23:00 0.83 STWHIP P WEXlT LD window milling assy. Mill was 2.73"+ and in real good
shape-little center wear. MU 2.72" tapered mill and used 1.75
deg motor
23:00 - 00:00 1.00 STWHIP P WEXIT RIH w/BHA #3
3~20~2003 00:00 - 00:45 0.75 STWHIP P WEXlT Continue RIH wi tapered mill assy
00:45 - 01:20 0.58 STWHIP P WEXlT Log tie-in down from 10600' 1.7/3690/25L Add 10.0'
01:20 - 04:45 3.42 STWHIP P WEXlT RIH at rain rate and tag at 10820'. See flag at 10818.5' (should
be at 10808'), muse muse. PUH and chk TF at 1.5/3150/30L
Backream above tag twice wi no motor work. Assume flag is
correcl; depth in relation to window, but did not correct. Start
pump and got good stall at 10819.6' @ 30L. Get a click and
dress from 10819.6' at 5L with about 8 stalls to 10821'. RIH
clean at 0.2'/min to tag at 10827.4'
04:45 - 06:10 1.42 S'I'WHIP P WEXIT Backream at 1.4/2770/15L to 10816', clean. RIH at min rate to
TD, get a click. Repeat at 5R, clean. Repeat at 20R, clean.
Repeat at 50R, clean. Repeat at 50R (missed the click), clean
06:10 - 08:00 1.83 STWHIP P WEXIT PUH and log down from 10590' 1.412750/80R. Tie-into Geology
PDC log (SWS CDN open hole log of 05/11/94) & subtracted
16' from CTD. Corrected depths are: TOW = 10798', BOW =
10802' & end of rat hole = 10811'. Paint EOP @ 10540'.
Decide to RBIH to confirm TD.
08:00 - 08:40 0.67 STWHIP N MlSC WEXIT RBIH & tag TD @ 10811'.
08:40 - 10:00 1.33 STWHIP P WEXIT POOH window dressing BHA.
10:00 - 11:15 1.25 STWHIP P WEXIT OOH. L/D window dressing BHA. Crayola guages 2.72" go /
2.71" no-go. Check MWD probe ~ OK.
11:15 - 12:00 0.75 DRILL P PROD1 M/U drilling BHA ~ with 2.69" x 3.0" DPI bicenter bit, 2-3/8"
motor with 2.12deg bend, GR-DIR MWD, new 30 degs orienter
& MHA (OAL = 50.79'). Scdbe tools.
12:00 - 13:20 1.33 DRILL P PROD1 Cut 115' of coil & weld-on a new CTC (ID = 1-1/16"). Pull test &
pressure test ~ OK.
13:20 - 14:15 0.92 DRILL P PROD1 Install dart catcher. Load wiper dart (same one for liner
cement). Launch & chase with 3% KCL. Dart hit @ 40.4bbls.
Retrieve dart easily.
14:15 - 16:10 1.92 DRILL p PROD1 RIH drilling BHA#4. Saw flag on depth. RIH to 10600'.
16:10 - 17:05 0.92 DRILL P PROD1 LOg GR & tie-into Geology PDC log. No correction to CTD.
17:05- 17:10 0.08 DRILL P PROD1 S/D pump, RIH &tagTD@ 10811'.
17:10 - 17:30 0.33 DRILL P PROD1 Check TF ~ 105R. Orient TF to 30R.
17:30 - 19:20 1.83 DRILL P PROD1 Start ddlling build section '. Ddll to 10830'~ '
1~350/350 _ ' . . . .. Meanwhile start
' .5ppg, flopro mud downhole.
19:20 - 20:40 1.33 ~ E,~-~~ 10850' 1.713150130R Hole displaced w/new mud. Start
Printed: 3/31/2003 11:01:32 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 45.62'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Point Mclntyre
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
8. Well Number
4. Location of well at surface P2-54 //
551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM X = 681483, Y = 5998032 9. Permit Numb. pr
At top of productive interval 194-059
3808' SNL, 444' EWL, SEC. 13, T12N, R14E, UM X = 686055, Y = 5994885 10. APl Number
At effective depth 50-029-22470-00
3917' SNL, 571' EWL, SEC. 13, T12N, R14E, UM X = 686186, Y = 5994779 11. Field and Pool
At total depth Point Mclntyre
3954' SNL, 615' EWL, SEC. 13, T12N, R14E, UM X = 686230, Y = 5994743
12. Present well condition summary
Total depth: measured 11180 feet Plugs (measured)
true vertical 9141 feet
Effective depth: measured 11080 feet Junk (measured)
true vertical 9059 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 20" 260 sx Arcticset (Approx.) 110' 110'
Surface 3905' 10-3/4" 1166 sx Coldset III, 375 sx Class 'G' 3940' 3721'
Intermediate
Production 11133' 7-5/8" 590 sx Class 'G' 11164' 9128'
Liner
Scab Liner 4830' 5-1/2" 219 sx Class 'G' 5726' - 10556' 5046' - 8639'
Perforation depth: measured 10794' - 10824', 10844' - 11008'
true vertical 8825' - 8850', 8866' - 9000'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 9Cr to 5666'; 3-1/2", 9.2#, 13Cr to 10701'
Packers and SSSV (type and measured depth) 4-1/2" Camco TRCP-4A SSSV at 2185'; 5-1/2" ZXP Mechanical Liner Top packer at
5711'; 3-1/2" Baker SABL-3 packer at 10500'
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch
14. Estimated date for commencing operation 15. Status of well classifications as:
February 23, 2003 ~ [] Oil [] Gas [] Suspended
16. If proposal was verbally approved
Service
Name of approver Date Approved
Contact Engineer Name/Number: Mark Johnson, 564.5666 Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is tru, e~and correct to the best of my knowledge ,
Sign ed Torde H ubb,, ~.,,¢.~,~_ ~j [~.~w~_.~itle CT Drilling Engineer Date
Conditions of Approval' Notify Commissior~-~ representative may.witness I
· v I /~pp~vv~ ~'~v. ~' ~
Plug integrity BOP Test ~ Location clearance I '
Mechanical lntegrity Test X Subsequentformrequiredl0-q~7
IApproved b¥ order of the Commission ORIel _N~.~ ~~¥r ~ .?~ !~ Commissioner Date .~...~..~/~
Form 10-403 Rev. 06/15/88 ,SC/~NNEC MAR [ ~
FEB 19 2003
Triplicate
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Mark O. Johnson
CTD Engineer
Date: February 13, 2002
Re: P&A operations for well P2-54 in prep for a CTD sidetrack
/
Well P2-54 is scheduled for a through tubing sidetrack with the SL~J~Nb/r~dic I Coiled Tubing Drilling rig. The
sidetrack, P2-54A, will kick off from a cement ramp window a,t/l'0~md. The P2-54A target is the Pt. Mac
formation. The following describes work planned to prep for ~acking and is submitted as an attachment to
Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference.
Pre CTD P&A Summary (expected to beqin 2/23103) 1. Slickline - Drift tubing and tag bottom.
2. Service coil - Scale blast tubing and casing. /
3. Slickline _ Drift tubing for caliper..,¢atil~er casing and tubing. DummyGLVs. MITIA/OA.
4. Service coil - P&A wellbor¢ with/24 ~ars of 17 ppg class G cement for cement ramp window. TOC
is planned for 10715' md. ¢ ~ /'
5. Other - WOC, PT wellbore to 1000 psi. P&A complete. If the cement were to fail the pressure/.
test, a second squeeze is not planned since this portion of the wellbore will be isolated by cement
during the primary cement job of the new sidetrack liner. Bleed flowlines to zero and ensure valves
hold. Remove wellhouse.
CTD Sidetrack Summary (expected to be,qin -315103) 1. MIRU CTD rig
2. Mill out 2.635'XN nipple and mill cement ramp window.
3. Drill 2.75"x 3' openhole to ~11840' TD with MWD/GR.
4. Run and cement 2 3/8" liner
5. RDMO.
Pre CTD P&A work is slated to begin on 2/23/03. Drilling coil is scheduled to mill the window and drill the
sidetrack ~3/5/03.
Mark O. Johnson/~/
CID Drilling Engineer
CC:
Well File
Sondra Stewman/Terrie Hubble
OANNtED MAR 1 0 2003
"'° P2 54 SAFEI'Y NOTES: 4-1/2" & 3-1/2" CHROME
~TIJATOR =,. ,.,~B~,,,K,~ ~ - -- TBG IN WELL. 7-5/8" CSG X'S OVER FROM
KB. ELEV = 46.95' L-80 TO 13CHROME @ 10039'.
~ax Angte = 43 @ 8493' f ~
i ~ I GAS LIFT MANDRELS
~ J I I ~ ST MD '[VD DEV TYPE VLV LTCH PORT DATE
r
ir
~ I 2 561o 4960 42 TMPOX DV BK! 0 01/05/01
Minimum
ID
2.635"
10679'
I I ~ = 3 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01
(~~==~'1 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01
3-1/2"
HES
XN
NIPPLE
I ! 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01
Ii!~ 6 9672 7972 42 KBG-2-9 DV INT 0 01/05/01
[7-5/8" MARKER JOINTS (2 JTS = 39') I'~ 10722' Mil 10715' I-~ ELMDWLOGGED04/09/01 [
PERFORATION SUMMARY
REF LOG: SPERRY RES/GR of 05/11/94
~ ANGLE AT TOP PEP, F: 36 @ 10794'
Note: Refer to Production DB for historical perf data
SIZE SPF INTI~VA L Opn/Sqz DATE
3-3/8" 6 10794 - 10824 O 07/22/94
3-3/8" 6 10844 - 10904 O 07/22/94
3-3/8., 6 10904-11008 0 07121/94
DA'ri REV BY C..OMMI~IT$ DATE REV BY COMMENTS POIN'r MCll~Ff RE UNIT
05/13/94 ORIGINAL COMPLE-['ION WELL: P2-54
04/19/00 RWO PERMIT No: 194-0590
11/28/00i SlS-lsl CONVERTED TO CANVAS APINo: 50-029-22470-00
02/21/01 SlS-LG REVISION SEC 14, T12N, R14E, 550' SNL & 1233' EWL
I ~ ~, ST MD -IYD DEV TYPE VLV LTCH PORT DATE
1 4331 4010 43 TMPDX DOME BK 16 01/05/01
2 5610 4960 42 TMPDX DV BK 0 01/05/01
3 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01
~ 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01
5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01
6 9672 7972 42 KBG-2-9 DV INT 0 01/05/01
7 10413 8529 40 KBG-2-9 DV INT 0 01/05/01
SIZE SPF INTI~VA L Opn/Sqz DATE
3-3/8" 6 10794 - 10824 O 07/22/94
3-3/8" 6 10844 - 10904 O 07/22/94
3-3/8" 6 10904 - 11008 O 07/21/94
TREE= 4-1/16" CIVV
ACTUATOR = BAKER C m TBG IN WELL 7-5/8" CSG X'S OVER FROM
KB. ELEV = 46.95' L-80 TO 13CHROME @ 10039'.
BF. ELEV = 14'
................................ KOP= "i'~)~'~; I 1
Max Angle: 43 1~ 8493' ~'~J~'~'l~'; ............... 'J (~8;1'~; ~K~05~ i '
t 2185' H 4-1/2" CAMCO TRCP-4A, TRSV, D = 3.812"
GAS LIFT MANDRELS
1 4331 4010 43 TMPDX DOMEi BK 16 01/05/01
~ 2 5610 4960 42 TMPDX DV BK 0 01/05/01
Minimum ID = 2.635" (~ t0579' / '~'-- 3 7216 6141 43 KBG-2-9 DOME INT 16 '01/05/01
m._
4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01
3'112" HE$ XN NIPPLE I 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01
6i 9672 7972 42 KBG-2-9 DV [ INT 0 01/05/01.
L
I
7 10413 8529 40 ! KBG-2-g) DV INT 0 ~01/05/01
×
×
×
I7-~8,, ~R~ER ~0,~ (2 ~ ~ ~9') ]~ I ~0~' I-'t E.~D ~ ~0~04/09/01 I T' Or-
ANGLEATTOPPERF: 36 @ 10794'
Note:RefertoP(oductionDBforhis,ricalperfdata 'cmtramp ~'
SIZE SPF INTERVAL Opn/Sqz DATE ;window
13-3/8" 6 10844- 10904 O 07/22/94
3-3/8" 6 10904 - 11008 O 07/21/94 I .... nted liner
11840'
13-CR, 0.045Obpf, ID=6.875" I 1
DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT
05/13/94 ORIGINAL COMPLETION 02/13103 moj ctd sidetrack proposed WELL: 1=2-54
04/19/00 , RWO PERMIT No: 194-0590
11/28/00 SIS-bi !CONVERTED TO CANVAS ARNo: 50-029-22470-00
02/21/01 SIS-LG REVISION SEC 14, T12N, R14E, 550' SNL & 1233'
10/08/01 CH/KAK !CORRECTIONS BP Exploration (Alaska)
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10794 - 10824 O 07122/94
3-3/8" 6 10844 - 10904 O 07/22/94
3-3/8" 6 10904 - 11008 O 07/21/94
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/13/94 ORIGINAL COMPLETION 02/13/03 moj ctd sidetrack proposed
04/19~00 RWO
11/28/00 SIS-bi ~CONVERTED TO CANVAS
02/21/01 SIS-LG REVISION
10/08/01 CH/KAK !CORRECTIONS
SUBJECT
ENGINEERING DATA
SHEET NO.__
OF__
BASED ON
ENGINEER
DEPT. APP'VL DATE
BUDGET/AFE NO.
FILE NO.
!
Io7/5 ET-~
~.~75
//~1o
AK 2337-1 (11/00)
2003
STATE OF ALASKA
ALASKA ~J~L AND GAS CONSERVATION COMM~O$1ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
ARCO Alaska Inc. [] Development KBE = 45.62'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Point Mclntyre
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM P2-54
At top of productive interval ~.~-~. '~ i~;:- ~r' -'-~ '~ ;7 ~' "i~/7~'~i~_ ~'~,' 9. Permit Number / Approval No.
~-.,.: ~.--- -,.~ , ~--, ;: 194-059
3806' SNL, 443' EWL, SEC. 13, T12N, R14E, UM '" '~:~; ..... '"'"' ....... ' ~' ~"~;/ 10. APl Number
At effective depth 50-029-22470-01
3909' SNL, 563' EWL, SEC. 13, T12N, R14E, UMN!^Y02 ~00~ 11. Fieldand Pool
At total depth Point Mclntyre
3953' SNL, 614' EWL, SEC. 13, T12N, R14E, UM,
12. Present well condition summary
Total depth: truemeasuredvertical 11180 feet9142 feet Plugs(measured)ORIGINAL
Effective depth: measured 11063 feet Junk (measured)
true vertical 9046 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 80' 20" 260 sx Arcticset (Approx.) 110' 110'
Surface 3905' 10-3/4" 1166 sx Coldset III, 375 sx Class 'G' 3940' 3721'
Intermediate
Production 11133' 7-5/8" 590 sx Class 'G' 11.164' 9129'
Liner
Scab Liner 4830' 5-1/2" 219 sx Class 'G' 5726' - 10556' 5046' - 8640'
Perforation depth: measured 10794' - 10824', 10844' - 11008'
true vertical 8826' - 8851', 8867' - 9001'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr to 5666'; 3-1/2", 9.2#, 13Cr to 10701'
Packers and SSSV (type and measured depth) 4-1/2" Camco TRCP-4A SSSV at 2185'; 5-1/2" ZXP Mechanical Liner Top packer at
5711'; 3-1/2" Baker SABL-3 packer at 10500'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
I-I Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations
17. I hereby certify that the fore, going is trqe and correct to the best of my knowledge
Signed TerrieHubble ~/~~(~~~ Title TechnicalAssistantlll Date'-'"'-~ '"'- "-'--~'(_.~/'(..~(..~ ·
Prepared By Name/Number: Terrie Hubble, 564-4628
Submit In Duplicate'-' ~
Form 10-404 Rev. 06/15/88
Progress Report
Facility Pt Mac 2
Well P2-54 Page 1
Rig Nabors 9ES Date 24 April 00
Date/Time
07 Apr O0
11:01-06:00
11:01-06:00
08 Apr 00 06:00-00:00
06:00-00:00
09 Apr 00 00:00
Duration
18-3/4 hr
18-3/4 hr
18hr
18hr
00:00-06:00
00:00-02:30
6hr
2-1/2 hr
02:30
02:30-04:00
04:00
1-1/2 hr
04:00-06:00 2 hr
06:00-13:30 7-1/2 hr
06:00-10:00 4 hr
10:00
10:00-10:30 1/2 hr
10:30
10:30-13:00 2-1/2 hr
13:00
13:00-13:30 1/2 hr
13:30
13:30-15:30 2 hr
13:30-14:00 1/2 hr
14:00
14:00-15:30 1-1/2 hr
15:30
NIAY 0 2 2000
Activity
Move rig
Rig moved 75.00 %
Move rig camp and shop to opposite side of DS 3.
Move off well at 1700 hrs, off DS 3 at 1800 hrs.
Arrive at PM ice road bypass at 0430 hrs. Drive out
onto rig mats. Shuttle mats around rig. Preparing
to make 2nd jump on mats. No problems/delays.
Move rig (cont...)
Rig moved 100.00 %
At well location - Slot
Move pits and sub across ice road, raise derrick
and spot rig over P2-54. Move camp and workshop to
P2-54. Spot Pit complex, workshop and camp. R/U Top
drive. Prepare rig for taking on fluid.
Wellhead work
Installed Accessories
Install secondary valve on live annulus and install
flowline while taking on 10.0 ppg brine.
Equipment work completed
Retrieved Hanger plug
Equipment work completed
Hook up lines to Xtree and test to 3500 psi.
Retrieve hanger plug with DSM. Tubing pressure @ 600 psi,
annulus @ 150 psi.
Circulated at 10165.0 ft
Commence circulating out Freeze Protect from well.
Wellhead work (cont...)
Circulated at 10165.0 ft
Stopped: To hold safety meeting
Recover 175 bbls contaminated crude & diesel from
tubing and annulus ( should be 84 bbls).
Held safety meeting
Completed operations
Hold H2S drill and conduct Pre-spud meeting with
Pad Operator and crews to discuss SIMOPS and ESD
systems.
Circulated at 10165.0 ft
Obtained bottoms up (100% annulus volume)
Circulate bottoms up with 10 ppg brine @ 3 BPM/150
psi. Loosing @ 20-25 bbls/hr.
Flow check
In 0.50 hr had 10.000 bbl Loss at wellhead
Flowcheck well- static losses of 15-20 bbls/hr.
Wellhead work
Installed Hanger plug
Equipment work completed
Install TWC and test from below to 200 psi ( unable
to get higher due to losses). TWC holding.
Removed Xmas tree
Equipment work completed
Remove Xtree and adaptor flange. Remove tree from
cellar for inspection. Pressure up on SSSV control
lines and tie off same around hanger neck. Inspect
hanger threads- good.
Progress Report
Facility Pt Mac 2
Well P2-54 Page 2
Rig Nabors 9ES Date 24 April 00
Date/Time
15:30-21:00
15:30-18:00
18:00
18:00-21:00
21:00
21:00-22:00
21:00-22:00
22:00
22:00-06:00
22:00-02:00
10Apr 00 02:00
02:00-06:00
06:00-16:30
06:00-06:30
06:30
06:30-15:30
15:30
15:30-16:30
16:30
16:30-06:00
16:30-18:00
18:00
18:00-19:30
19:30
19:30-03:30
llApr00 03:30
03:30-04:30
04:30
Duration
5-1/2 hr
2-1/2 hr
3hr
lhr
lhr
8hr
4hr
4hr
10-1/2 hr
1/2 hr
9hr
lhr
13-1/2 hr
1-1/2 hr
1-1/2 hr
8hr
MAY 02_ 2000
Activity
BOP/riser operations - BOP stack
Rigged up BOP stack
Equipment work completed
N/U BOPE and flowline pitcher and nipple. Hook onto
wellhead annulus and maintain hole fill- loosing @
24 bbls/hr.
Tested BOP stack
Pressure test completed successfully - 3500.000 psi
RfU and test BOPE to 250/3500 psi. John Crisp of
AOGCC waived witness.
Wellhead work
Removed Hanger plug
Equipment work completed
R/U DSM and pull TWC. Clear rigfloor.
Pull Gas lift completion, 4-1/2in O.D.
Retrieved Tubing hanger
Equipment work completed
M/U landing string to Hanger. BOLDS. Pull hanger to
rigfloor. R/U chrome handling equipment. L/O
landing joint and tubing hanger. While conducting these
operations flowcheck well- loosing @ 10-15 bbls
/hr.
Laid down 2200.0 ft of Tubing
POOH laying down 4.1/2" Chrome tubing. 52 joints @
report time, @ SSSV. Well looisng 15 bbls/hr.
Filling hole with 9.8 ppg brine.
Pull Gas lift completion, 4-1/2in O.D. (cont...)
Retrieved SCSSSV
Completed operations
L/D Camco SSSV and R/D control line pulling
equipment. SSSV transported to Camco shop for inspection.
Laid down 10165.0 ft of Tubing
Fish at surface
POOH laying down 4.1/2" Chrome, L-80 tubing.
Visually in very good shape. 253 joints recovered and 1 x
cut off @ 3.89 ft. 7 x GLM's.
Rigged down Completion string handling equipment
Equipment work completed
R/D Chrome Handling Equipment and clear rigfloor.
BHA run no. 1
Rigged up Drillstring handling equipment
Equipment work completed
Load pipe shed with DC's. Clean rig and prepare to
P/U BHA. Install wear ring.
Made up BHA no. 1
BHA no. 1 made up
M/U BHA #1 - Overshot assembly w/4.5" basket
grapple.
Singled in drill pipe to 10103.0 ft
240 joints picked up
Fished at 10148.0 ft
Fish came free
Up weight -- 195 klbs, down weight 150 klbs. Wash
over fish @ 2 BPM/200 psi. Engage fish @ 10,148'.
Facility
Date/Time
12 Apr 00
Progress Report
Pt Mac 2
Well P2-54
Rig Nabors 9ES
Page 3
Date 24 April 00
Duration
Activity
04:30-06:00
04:30-06:00
06:00-09:30
06:00-08:00
08:00
08:00-09:30
09:30
09:30-04:00
09:30-10:30
10:30
10:30-14:00
14:00
14:00-15:30
15:30
15:30-16:00
16:00
16:00-18:30
18:30
18:30-19:00
19:00
19:00-22:00
22:00
22:00-02:30
02:30
02:30-04:00
04:00
04:00-06:00
04:00-04:30
04:30
04:30-06:00
06:00-15:30
1-1/2 hr
1-1/2 hr
3-1/2 hr
2hr
1-1/2 hr
18-1/2 hr
lhr
3-1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
3hr
4-1/2 hr
1-1/2 hr
2hr
1/2 hr
1-1/2 hr
9-1/2 hr
Pulled out of hole to 9000.0 ft
Cccontinue POH w/BHA #1.
Pulled out of hole to 9000.0 ft
POOH.
Static losses @ 10 BPH.
BHA run no. 1 (cont...)
Pulled out of hole to 405.0 ft (cont...)
POOH.
Static losses @ 10 BPH.
AtBHA
Pulled BHA
Recovered 6.6' K-anchor latch and cut stub.
BHA Stood back
BHA run no. 2
Made up BHA no. 2
Clear rig floor, make up mill BHA #2.
BHA no. 2 made up
R.I.H. to 9740.0 ft
Stopped: To service drilling equipment
Serviced Block line
Service top drive, slip and cut drill line.
Line slipped and cut
R.I.H. to 10150.0 ft
At Top of packer: 10150.0 ft
Milled Permanent packer at 10150.0 ft
PUW 196, SOW 151, RW 175.
Record pressures and rates, Mill packer.
Completed operations
R.I.H. to 10484.0 ft
Monitor well, push packer/tailpipe fish to PBTD.
Top of fish: 10,484'.
On bottom
Circulated at 10484.0 ft
Break circulation, observe flow, shut in well.
SIDP = 0, SICP = 50 psi. Circ gas bubble from well
through choke at 3 bpm.
Influx At surface
Pulled out of hole to 465.0 ft
SICP = 0, open annular prevertor, observe well
static, POH.
At BHA
Pulled BHA
Mill 20% used. Clean cuttings from boot baskets.
BHA Laid out
BHA run no. 3
Made up BHA no. 3
MU spear catch assembly.
BHA no. 3 made up
R.I.H. to 5200.0 ft
Continue RIH with fishing spear
BHA run no. 3 (cont...)
Progress Report
Facility Pt Mac 2
Well P2-54 Page 4
Rig Nabors 9ES Date 24 April 00
Date/Time
06:00-07:30
07:30
07:30-08:00
08:00
08:00-09:30
09:30
09:30-14:00
14:00
14:00-15:30
15:30
15:30-05:30
15:30-17:00
17:00
17:00-21:00
21:00
21:00-22:00
22:00
22:00-03:30
13 Apr 00 03:30
03:30-05:30
05:30
05:30-06:00
05:30-06:00
06:00-13:00
06:00-13:00
13:00
13:00-06:00
13:00-15:30
Duration
1-1/2 hr
1-1/2 hr
4-1/2 hr
1-1/2 hr
14hr
1-1/2 hr
4hr
lhr
5-1/2 hr
2hr
1/2 hr
1/2 hr
7hr
7hr
17hr
2-1/2 hr
Activity
R.I.H. to 10400.0 ft (cont...)
Continue RIH with fishing spear
At Top of fish: 10484.0 ft
Fished at 10484.0 ft
Break circ. w/47 spm. @ 310 psi. PU 196 K. SO 153
K. Wash down and latch fissh. PU with 215 K.
Fish came free
Circulated at 10484.0 ft
CBU at 88 SPM & 1034 psi. Flow check 15 min. Well
Static
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 10484.0 ft
POOH with fish. Monitor well at top of DC. Well
Static.
Fish at surface
Laid down fish
Stand back DC. Release spear and LD packer and
tail pipe
Complete fish recovered
BHA run no. 4
Made up BHA no. 4
Clear floor and pick up tools for junk
basket/scraper run. MU BHA #4 and DC.
BHA no. 4 made up
R.I.H. to 10551.0 ft
RIH to top of junk.
On bottom
Washed to 10581.0 ft
Wash over junk from 10551 to 10571'. Wash sand to
10581 ft.
At Top of fill: 10581.0 ft
Pulled out of hole to 366.0 ft
Pump slug and POOH standing back 5000 ft. of 4" DP.
LD 5500' singles.
At BHA
Pulled BHA
LD BHA # 4. Recover 6# broken slips and packerbands
from RCJB and 12 # smaller junk from boot baskets.
packer.
Completed operations
Electric wireline work
Rigged up sub-surface equipment - Downhole measurement tools
RU Schlumberger for USIT
Electric wireline work
Conducted electric cable operations
RU Schlumberger for USIT log. RIH to 8000 ft. log
in combination mode at 6000 fph from 8000 ft. to
200ft. RIH to 4700 ft. and log from 4700 ft. to
3700
ft. in corosion mode at 1400 fph. POOH and RD
wireline.
Completed logging run with Acoustic log from 8000.0 ft to 200.0 ft
Perform integrity test
R.I.H. to 4000.0 ft
BTT *T~r'I*'~F'O --~1 ..... ~xT'~ ---A BTTT .~ .tnnn c,
)00
Progress Report
Facility Pt Mac 2
Well P2-54 Page 5
Rig Nabors 9ES Date 24 April 00
Date/Time
15:30
15:30-20:30
20:30
20:30-03:00
14Apr 00 03:00
03:00-04:30
04:30
04:30-04:45
04:45
04:45-05:00
05:00
05:00-05:30
05:30
05:30-05:45
05:45
05:45-06:00
06:00
06:00-13:00
06:00-10:00
10:00
10:00-13:00
13:00
13:00-15:30
13:00-15:30
15:30
15:30-05:30
15:30-16:00
16:00
16:00-22:30
Duration
5hr
6-1/2 hr
1-1/2 hr
1/4 hr
1/4 hr
1/2 hr
1/4 hr
1/4 hr
7hr
4hr
3hr
2-1/2 hr
2-1/2 hr
14 hr
1/2 hr
6-1/2 hr
At Setting depth · 4000.0 ft
Tested Casing MAY 22000
Set RTTS at 4000 ft. Close annular preventer and
test casing above to to 3000 psi. for 5 min.
with no leak off. Bleed pressure, open annular and
unseat R~S. Continue in hole and repeat test at
45]0, 5042, 5322, 5602 ft. NO leak.
Suspended pressure test on Casing, observed leak
R.I.H. to 10100.0 ff
Load and strap single DP into pipe shed. P/U
singles and ~.
At Setting depth' 10100.0 ft
Tested Casing
Set R~S at 10100 ~. and test casing to to 230 psi
. leaked off. Unseat and pull to ]0070 and
retest. Leaked off. Test DP side with 1500 psi. Lost 75
psi in 5 ~n. Unseat and monitor well.
Suspended pressure test on Casing, observed leak
Pulled out of hole to 9145.0 fl
POOH to 9145 ft.
At Setting depth · 9145.0 ft
Tested Casing
Test to 165 psi in 20 stks, bled to 0 in 3 minutes,
Suspended pressure test on Casing, observed leak
Pulled out of hole to 8213.0 ft
At Setting depth' 8213.0 ft
Tested Casing
Pressure to 250 psi in 30 stks, bled to 0 in 3
~nutes.
Suspended pressure test on Casing, observed leak
Pulled out of hole to 7750.0 fl
At Setting depth' 7750.0 h
Peffo~ inte~ity test (cont...)
Tested Casing
POOH &om 7746' to 6813' and test.. No leak. RIH
and test at 7281'. Leaked off. POOH and test at
7188'. NO leak. Tested casing above 7188' to 3000 psi
for 30 ~n. Lost 100 psi.
Pressure test completed successfully - 3000.000 psi
Pulled out of hole to 7188.0 ~
POOH and LD R~S. All packer rubber intact. Clear
floor.
At B~
Test well consol equipment
~gged up Bottom ram
Pull ~ abd run Test plug. Change bottom rams to 3
1/2 x 6 "VBR and test to 3500 PSI. Puli TP and
set ~.
Work completed - Bottom ram in position
Run Liner, 5-1/2in O.D.
~gged up Casing handling equipment
Work completed - Handling equipment in position
Ran Liner to 10555.0 h (5-1/2in OD)
Progress Report
Facility Pt Mac 2
Well P2-54 Page 6
Rig Nabors 9ES Date 24 April 00
Date/Time
22:30
22:30-23:00
23:00
23:00-03:30
15Apr 00 03:30
03:30-05:30
05:30
05:30-06:00
05:30-06:00
06:00-08:30
06:00-06:30
06:30
06:30-06:45
06:45
06:45-07:15
07:15
07:15-07:30
07:30
07:30-07:45
07:45
07:45-08:30
08:30
08:30-14:00
08:30-10:00
10:00
10:00-11:00
11:00
11:00-14:00
Duration
1/2 hr
4-1/2 hr
2hr
1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
1/4 hr
1/4 hr
1/4 hr
3/4 hr
5-1/2 hr
1-1/2 hr
lhr
3hr
Activity 17 #, L-80 M-BTS
At Top of liner · 4855.0 ft
Circulated at 4935.0 ft
Circ. liner volume. 112 bbl. at 83 spm. & 360 psi.
PU -- 109 K, SO = 100 K.
Hole displaced with Brine - 45.00 % displaced
Ran Liner in stands to 10566.0 ft
RIH on DP. Tag sand at 10566'.
On bottom
Circulated at 10555.0 ft
PU to 10555'. MU cementing head. Break circ. 17
spm @ 60 psi. Pump 20 bbl. LCM pill w/2.5 ppb
N-vis,
10 ppb OM seal, and 5 ppb Barofiber. Displace 250
bbl at 70 spm and 500 psi. and circ. past liner
top.
20.000 bbl LCM pill spotted downhole, LCM content 15.0 lb/bbl
Cement · Liner cement
Held safety meeting
Liner cementing and packer setting safty and
operational meeting.
Cement' Liner cement (cont...)
Tested High pressure lines
Pumped 5 bbl water spacer. Tested lines to 5000
psi. Pumped 5 aditional bbl. water
Pressure test completed successfully - 5000.000 psi
Mixed and pumped slurry - 92.200 bbl
Mixed 14.0 ppg class G
Released Dart
Displaced slurry - 169.900 bbl
Displaced with 9.8 ppg brine. Recriprocated liner
until 20 bbl cement past shoe. Set liner at 10556'
and comtinued displacement. Did not see dart
latch. Bumped plug at calculated displacement.
Plug bumped
Functioned Hanger assembly
Set liner hanger with 3000 psi.
Equipment work completed
Functioned Packer assembly
Release pressure and check floats. Weight check
liner hang off w/50 K slack off. Set packer with
4250 psi.
Equipment work completed
Circulated at 5712.0 ft
Unseat running tool and circulate bottoms up.
Recovered -25 bbl lightly cement cut brine.
Obtained clean returns - 110.00 % hole volume
Pull Drillpipe, 4in O.D.
Pulled Drillpipe in stands to 4300.0 ft
Pulled stands to 4300'. LD cement head
Stopped · To service drilling equipment
Serviced Block line
Cut and slip drilling line. Service topdrive
Line slipped and cut
Laid down 4000.0 ft of Drillpipe
,,--1 ...... :-- ~1^~ ~1 ..... 12~-~ '
LUUI~,
MAY O;
Facility
Date]Time
Pt Mac 2
Duration
14:00
14:00-01:00 11 hr
14:00-15:30 1-1/2 hr
15:30
15:30-01:00 9-1/2 hr
16Apr00 01:00
01:00-02:00 1 hr
01:00-02:00 1 hr
02:00
02:00-06:00 4 hr
02:00-06:00 4 hr
02:00-06:00 4 hr
06:00-19:00 13 hr
06:00-06:30 1/2 hr
06:30
06:30-08:00 1-1/2 hr
08:00
08:00-11:00 3 hr
Progress Report
11:00
11:00-17:30 6-1/2 hr
Well P2-54 Page 7
Rig Nabors 9ES Date 24 April 00
17:30
17:30-19:00 1-1/2 hr
Activity
129 joints laid out
BHA run no. 6
Made up BHA no. 6
Make up 4.75" mill on 3 1/8" Navidrill motor. PU 3
1/2" DC and Jars·
BHA no. 6 made up
R.I.H. to 10293·0 ft
Surface test motor. PU 2 3/8" DP and RIH to TOL.
Break circ. RIH with 4" stands and tag soft cement at
10293'. PU=145 K. SO=120 K. Circ. at 950 psi @ 34
spm. Circ 20 min.
Stopped: To pressure test
Perform integrity test
Tested Liner
Test 5.5 "liner and 7·625 casing to 3000 psi for
30 min. Took 3·25 bbl to reach 3000 psi. Lost 50 psi
in 30 min.
Pressure test completed successfully - 3000.000 psi
BHA run no. 6
Drilled installed equipment - Float collar
Drilled thrugh float shoe and soft cement to top of
sand at 10566.
Drilled installed equipment - Float collar
Drill soft cement, landing collar, soft cement,
float collar, and soft cement to float shoe. Drilled
with 2000 psi. @ 120 gpm. WOB = 2-4 K. RPM = - 150.
BHA run no. 6 (cont.·.)
Drilled installed equipment - Float collar (cont...)
Drill soft cement, landing collar, soft cement,
float collar, and soft cement to float shoe· Drilled
with 2000 psi. @ 120 gpm. WOB = 2-4 K. RPM = N 150.
Completed operations
Washed to 10852.0 ft
Washed sand to 10666 ft and pumped 20 bbl. N-vis
sweep· Washed to 10758 and pumped 20 bbl. N vis sweep
· Washed to 10852 ft. Pipe plugged off on
connection.
Pressure changed from 2000.0 psi to 2800.0 psi in 0.25 hr - String
blocked
Worked toolstring at 10852.0 ft
Worked pipe and pumps to clear string· Pulled 5
stand and work pipe. Pulled 5 more and repeat with no
change pulled to 9919 ft. and dropped ball.
Attemped tonopen circ. sub. Sub did not shif.
Completed operations
Pulled out of hole to 225·0 ft
POOH· Found circ.sub ball in top box of 2 3/8 '
DP. sitting on top of curdled and floculated
N-vis.eck. Continued POOH with sporatic accumulations of
N-vis "pudding" in tool joint neck downs and clear
brine between· N-vis floculate will sink in brine
At BHA
Pulled BHA
LD drill collars. ,-,~---,r-~ ·
,.~.~c~ circ. sub. ~ a x,r_,
x.uuliu ~v~utor
Progress Report
Facility Pt Mac 2
Well P2-54 Page 8
Rig Nabors 9ES Date 24 April 00
Date/Time
19:00
19:00-21:30
19:00-21:30
21:30
21:30-06:00
21:30-22:30
22:30
22:30-05:00
17 Apr 00 05:00
05:00-06:00
05:00-06:00
06:00-01:00
06:00-07:30
07:30
07:30-13:30
13:30
13:30-23:30
23:30
23:30-01:00
18 Apr 00 01:00
01:00-06:00
01:00-03:00
03:00
03:00-06:00
06:00-00:30
06:00-00:30
Duration
2-1/2 hr
2-1/2 hr
8-1/2 hr
lhr
6-1/2 hr
lhr
lhr
19hr
1-1/2 hr
6hr
lOhr
1-1/2 hr
5hr
2hr
3hr
18-1/2 hr
18-1/2 hr
Activity and bit completely plugged with sand below float. LD
BHA Laid out
Test well control equipment
Tested BOP stack
Test BOP 250 psi. / 3500 psi. Witness waived by
Tom Maunder, AOGCC.
Pressure test completed successfully - 3500.000 psi
BHA run no. 7
Made up BHA no. 7
Mill clean out BHA without motor.
BHA no. 7 made up
R.I.H. to 10555.0 ft
Run in hole. Fill DP with 30 bbl. N-vis sweep.
At Setting depth: 10555.0 ft
Washed to 10900.0 ft
Wash to 10900'. Pump N-vis sweeps with heavy sand
returns at screens. Pumping 193 gpm at 3300 psi.
Washed to 10900.0 ft
Wash from 10900 ft. to 11063 ft. w/ 262 gpm @ 3050
psi. Pumped 20 bbl N-vis sweep every connection.
BHA run no. 7 (cont...)
Washed to 11063.0 ft (cont...)
Wash from 10900 ft. to 11063 ft. w/ 262 gpm @ 3050
psi. Pumped 20 bbl N-vis sweep every connection.
On bottom
Circulated at 11063.0 ft
CBU three times. Pumped three 40 bbl N-vis sweeps.
Heavy sand returns gradually cleaned up. Recovered
pieces of 7 5/8" wiper plug. Spotted 30 bbl. 9.8
ppg Nacl on bottom.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 200.0 ft
Pump Dry job and POOHlaying down DP. Pulled wet.
POOH to 10500'. Open circ sub and pump dry job #2.
POOH to BHA.
At BHA
Pulled BHA
LD BHA.
BHA Laid out
Run Gas lift completion, 4-1/2in O.D.
Rigged up Tubing handling equipment
RD drill string handling tools. Clear floor. Rig
up tubing handling tools. Held PJSM.
Work completed - Tubing handling equipment in position
Ran Tubing to 1200.0 ft (3-1/2in OD)
Run 3 1/2",9.2 #, 13 Cr. completion.P/U WLEG, XN
nipple, 5 jts. NSCT tubing, Baker SABL-3 packer,X
nipple, ljt. 3 1/2" FOX tbg., GLM # 1, 18 jts tbg.
Continuing to run tubing per plan.
Run Gas lift completion, 4-1/2in O.D. (cont...)
Ran Tubing to 10701.0 ft (4-1/2in OD)
Run 3.5" x 4.5" 13-CR completion: Wleg, XN nip., 5
jts 3.5", 9.2 #, 13-CR NSCT tbg, SABKL-3 pkr, X
nip., 5 GLM in 124jt. 3.5", 9.2#, 13-Cr,Fox
tbg.,XO 2 GLM and SSSV in142jt. 4.5", 12.6#, 13
Facility Pt Mac 2
Progress Report
Well P2-54 Page 9
Rig Nabors 9ES Date 24 April 00
Date/Time
19 Apr 00 00:30
00:30-05:00
00:30-05:00
05:00
05:00-06:00
05:00-06:00
Duration
4-1/2 hr
4-1/2 hr
lhr
lhr
Activity
Hanger landed
Land w/single control line under pressure, TWC
installed in hanger.
Nipple down BOP stack
Rigged down BOP stack
Test TWC and hanger seals via annulus to 500 psi.
Change bottom rams to 2 7/8 x 5", Clean sand from
BOP body, ND BOP.
Work completed, equipment laid out
Run Single completion, 4-1/2in O.D.
Installed Adapter spool
Test SSCV lines and NU adaptor spool.
e o i o
F' E R k~ iii T .C A T A T D A, T A.._F' L U S R IJ N
9L~ ..... 059 ~fURVE¥ R 0
9~.--~059 ~IJEVEY D FZNAL H~/D~ SF'EEEY~.SLIN
9a--059 ~ESS/TENP L 10670--i086~ '1
9a.--'059 ~HP REC L 10600'"10985 1
94~059 ~R,/CCL L 10050-11010 0~l¢1 1
9z~ .... 059 GET L 70 .... '10970 1
o/+ ._ 0 ~, 9 ~ 6 D 102 a/~ '"" 11 'i 81 ,", H /," D N 1
9a--'"059 ~,h! L 10288---'i 118i 'i
9/~ .... 059 ~RVEY R 0,
9a.-'--059 ~5 D 0'~'1 ii6~a. GCT
i
0/+/ i/,,-/96
DA'rE ...... RECVD
05 / i 3 / 9
(')5/,' / 3/
(')9/28/
09/' 29//9a.
09 / ":' 9 / q
~-~.. .,,. ~.
09/2 St ,/9 x~
12/06/94
1 2 / 0 6/9 a
I 1 / 30/' 9 a
I 1/30/9
,,Ar'e cir'y d'i'tci~ sampJes r'equ~'r'ed? yes ,__~)~And r"e,'~--"',,~:,"? ~,:, ~l~
Was the we'ii eot'ed? yes no Ana iys'i's & descr'~'pt-i:or'~ r'ece'i",/ed? yes
Ar'e we J 'i tes't;:s r'equ~ r'ed? yes no Rece'f ved? yes no
We J 'J ~'s ~'n comp'J ~'ance
I n ~' t ~' a 'i
CONHENTS
Date:
Subject:
From:
ARCO Alaska Inc.
Greater Point McIntyre Engineering
December 2, 1994
Transmittal Number
ARCO Alaska, Inc.
741
To:
Bob Crandall
AC)GCC
3001 Porcupine Drive
Anchorage, AK 99501
The following Greater Point McIntyre Area data are enclosed. This information is confidential
and your cooperation in maintaining confidentiality is appreciated:
Well
Name Data Description Run # Date Run
v/tY2-07
~,~-07
FINAL TAPE: DLL/ZDL/CN/GR LIS (LDW.G) I 5-26-94
Format -
FINAL LOG: Borehole Profile ~o. % (~/1. 5-26-94
FINAL LOG: SubSea VD (Multi-sho{'°do,,~, ~'~a' 1~" 5-26-94
P~-07 Directional Survey) ~'~..
:~.,B~,~. P~ FINAL LOG: Z-nensilo§/Comp ~ . ~'~'/o~,~ 5-26-94
~.~- Neutron/GR/Caliper
~(~')~!)~'" PC. or FINAL LOG: DualLaterolog/GR/SP '~O~ ~x'O10:d~"~;26-94
~7 FINAL LOG: Formation Multi-Tester/GR ~e~' c:~ 5-27-94
~i~--~iI a.. P2-24'/ FINAL LOG: Dual GR/EWR-Phase Comp 4/23/94
":!:i--'.!:I ~)b/ 4/F~rmation Exposure Time (TVD)
-'!~i? ~ ,M~-21 FINAL LOG: Dual GR/EWR-Phase Comp 4/23/94
: -'.~~. ~/Formation Exposu;e Time (MD) ..
· ~ FINAL LOG: Leak Detection Log and Static I 6-26-94
· ~ Temperature
._/" ~/P2-54 FINAL DISKETTE: CDN with LIS Verification I 5-11-94
~~, 0 ~Ok Listing (.TIF/~~)t(T,'
Company
Atlas Wireline
Atlas Wireline
Atlas Wireline
Atlas Wireline
Atlas Wireline
Atlas Wireline
Sperry Sun
Sperry Sun
Schlumberger
Schlumberger
Schlumberger
Transmittal Number: 741 Page: 1
Well
Name ,~ Data Description
fl' DTP* (Depth Corrected)
~2-54 ~)/skette: GCT Directional Survey (0' 11164'
WB-02
Please
Tubing Puncher Record ( 1 n/~6,, Tubing 1
Puncher)
· to:
s1 eturn
Run #
1
Date Run
10/27/94
Company
Schlumberger
7/6/94
Schlumberger
10/1/94 Schlumberger
GPMA Engr Aide, ATO-462
ARCO Alaska, Inc..
P.O. Box 100360
Anchorage, Alaska 99510-0360
Transmittal Number: 749 Page: 2
SUB- SURFACE
DIRECTIONAL
~ UIDANCE
~ ONTINUOUS
~ OOL
Company
ARCO ALASKA, INC.
Well Name P2-54 (551' FNL, 1233' FWL, SEC 14, TWN 12N, RNG 14E)
Field/Location POINT HCINTYRE, NORTH SLOPE, ALASKA
Job Reference No.
94250
Loqqed By:
WEST/JOHNSON
Date
SCHLUMBERGER
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
ARCO ALASKA, INC.
P2 - $4
POINT MCINTYRE
NORTH SLOPE, ALASKA
SURVEY DATE' 06-JUL-1994
ENGINEER' T. WEST
METHODS OF COMPUTATION
TOOL LOCATION: MINIMUM CURVATURE
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH $3 DEG $9 MIN EAST
COMPUTATION DATE' 7-JUL-94 PAGE I
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 06-JUL-1994
KELLY BUSHING ELEVATION' 47.00 FT
ENGINEER' T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTZCAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 oo
100 O0
200 O0
300 O0
400 oo
500 O0
600 O0
700 oo
800 O0
900 O0
0 oo
100 O0
200 O0
300 O0
399 99
499 99
599 98
699 96
799 88
899 77
-47 O0
53 O0
153 O0
253 O0
352 99
452 99
552 98
652 96
752 88
852 77
0 0 N 0 0 E
0 27 N 83 34 E
0 20 N 84 48 E
0 24 S 84 37 E
0 32 S 87 59 E
0 35 S 84 8 E
0 43 S 74 45 E
I 46 S 66 15 E
2 28 S 62 43 E
2 59 S 60 52 E
0 oo
0 17
0 64
I 16
I 83
2 69
3 68
5 65
9 44
14 08
0 O0
000
000
0 O0
0 O0
0 oo
o OO
0 O2
o O0
o O1
0 oo N
0 03 N
0 14 N
0 llN
0 07 N
0 02 S
0 22 S
0 95 S
2 68 S
4 89 S
0 O0 E
0 23 E
0 89 E
1 51 E
2 31 E
3 31E
4 39 E
6 29 E
9 72 E
13 85 E
0.00 N 0 0 E
0 23 N 83 19 E
0 90 N 81 7 E
1 52 N 85 56 E
2 31 N 88 21E
3 31 S 89 34 E
4 40 S 87 6 E
6.36 S 81 23 E
10.09 S 74 36 E
14.69 S 70 34 E
1000 O0
1100
1200
1300
1400
1500
1600
1700
1800
1900
999 57
O0 1099
O0 1198
O0 1297
O0 1397
O0 1495
O0 1594
O0 1692
952.57 4 17 S 56 7 E
22 1052.22 5 9 S 53 1 E
75 1151.75 6 23 S 48 43 E
95 1250.95 7 44 S 44 40 E
O1 1350.01 8 3 S 44 26 E
88 1448.88 9 32 S 49 35 E
24 1547.24 10 58 S 53 8 E
40 1645.40 11 2 S 52 47 E
S 51 23 E
S 50 40 E
O0 1790 57 1743.57 11 1
O0 1888 70 1841.70 11 10
20 35
28 71
38 43
50 85
64 37
79 19
97 18
116 30
135 34
154 55
o Ol
0 O0
0 O3
0 oo
0 oo
0 O2
0 oo
0 O0
0 O0
0 O0
8 20 S
13 09 S
19 16 S
27 88 S
37 65 S
47 99 S
59 10 S
70 56 S
82
94
19 19 E
25
33
42
52
63
77
92
33 S 107
42 S 122
20 87 S 66 51E
98 E 29
59 E 38
60 E 50
21E 64
03 E 79
18 E 97
48 E 116
48 E 135
44 E 154
O9 S 63 16 E
67 S 60 18 E
91 S 56 48 E
37 S 54 12 E
21 S 52 43 E
21 S 52 34 E
33 S 52 39 E
39 S 52 33 E
61 S 52 22 E
2000 O0 1986 77 1939 77 11 23
2100
2200
2300
2400
2500
2600
2700
2800
2900
O0 2084 76 2037
O0 2182.62 2135
O0 2279.53 2232
O0 2375.53 2328
O0 2471.20 2424
O0 2565.85 2518
O0 2659.54 2612
O0 2752.92 2705
O0 2845.94 2798
76 11 37
62 12 25
53 15 45
53 16 32
20 17 38
85 19 55
54 20 46
92 21 11
94 22 7
S 49 31 E
S 49 12 E
S 49 49 E
S 54 38 E
S 56 2O E
S 56 28 E
S 57 22 E
S 57 32 E
S 56 48 E
S 56 46 E
174 06
193 93
214 42
239 04
267 O1
296 09
328 29
363 16
398 90
435 56
0 oo
0 oo
0 O3
0 o2
0 oo
0 O3
0 O2
0 oo
0 01
0 O2
106 96 S 137 44 E 174 15 S 52 7 E
119
133
148
164
180
197
216
235
256
94 S 152
36 S 168
35 S 187
06 S 210
18 S 235
84 S 262
58 S 291
98 S 321
09 S 352
57 E 194
14 E 214
68 E 239
83 E 267
07 E 296
05 E 328
54 E 363
61E 398
32 E 435
07 S 51 50 E
61 S 51 35 E
23 S 51 41E
15 S 52 7 E
18 S 52 32 E
35 S 52 57 E
18 S 53 24 E
90 S 53 44 E
56 S 53 59 E
3000 O0 2937 94 2890 94 24 3
3100
3200
3300
3400
350O
3600
37OO
3800
3900
O0 3028
O0 3117
O0 3204
O0 3289
O0 3374
O0 3456
O0 3537
O0 3615
O0 3690
39 2981
15 3070
45 3157
73 3242
07 3327
95 3409
35 3490
10 3568
50 3643
39 26 37
15 27 57
45 30 26
73 32 8
07 32 56
95 35 0
35 37 50
10 40 12
50 41 29
S 57 2 E
S 57 1E
S 56 19 E
S 55 38 E
S 55 44 E
S 55 4O E
S 56 12 E
S 57 8 E
S 57 36 E
S 57 54 E
474 69
517 24
563 25
611 97
664 17
717 87
773 79
833 16
895 93
961 46
0 02
0 O2
0 01
0 02
0 01
0 02
0 02
0 O2
0 03
0 O0
277 52 S 385 12 E 474 70 S 54 13 E
3OO
325
353
382
413
444
477
510
545
66 S 420
97 S 459
32 S 499
74 S 542
03 S 587
41S 633
O5 S 683
96 S 736
97 S 791
91E 517
39 E 563
74 E 612
88 E 664
25 E 717
58 E 773
25 E 833
20 E 896
77 E 961
26 S 54 28 E
29 S 54 38 E
02 S 54 44 E
24 S 54 49 E
95 S 54 53 E
9O S 54 57 E
31 S 55 5 E
14 S 55 14 E
76 S 55 25 E
COMPUTATION DATE' 7-JUL-94 PAGE 2
ARCO ALASKA, INC.
P2 - 54
POINT MCZNTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 06-JUL-1994
KELLY BUSHING ELEVATION' 47.00 FT
ENGINEER' T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG MZN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MZN
4000 O0 3765 93 3718 93 40 49
4100 O0 3841
4200 O0 3914
4300 O0 3987
4400 O0 4061
4500 O0 4135
4600 O0 4209
4700 O0 4283
4800 O0 4357
4900 O0 4431
03 3794
55 3867
61 3940
16 4014
06 4088
18 4162
26 4236
59 4310
76 4384
03 42 3
55 43 10
61 42 50
16 42 27
06 42 15
18 42 9
26 41 58
59 42 2
76 42 8
S 57 16 E 1026 98
S 58 37 E 1092
S 58 44 E 1160
S 58 22 E 1228
S 57 52 E 1296
S 57 42 E 1363
S 57 33 E 1430
S 57 29 E 1497
S 57 33 E 1564
S 57 25 E 1631
88
42
48
O6
28
27
32
10
04
o Ol
0 O1
0 O1
0 O1
0 O1
0 O0
0 O0
0 O1
0 O0
0 O1
581 10 S 847 24 E 1027.37 S 55 33 E
616
651
687
723
758
794
831
867
9O3
43 S 903
62 S 960
23 S 1019
03 S 1076
97 S 1133
91S 1190
04 S 1247
Ol S 1303
03 S 1360
02 E 1093.36 S 55 41 E
94 E 1161.04 S 55 52 E
20 E 1229.25 S 56 1 E
73 E 1296.96 S 56 7 E
71E 1364.30 S 56 12 E
40 E 1431.41 S 56 16 E
03 E 1498.57 S 56 19 E
44 E 1565.46 S 56 22 E
02 E 1632.52 S 56 25 E
5000 O0 4505 96 4458 96 42 3
5100
5200
5300
5400
5500
5600
5700
5800
5900
O0 4580
O0 4654
O0 4729
O0 4803
O0 4877
O0 4952
O0 5026
O0 5100
O0 5174
24 4533
64 4607
01 4682
46 4756
85 4830
08 4905
32 4979
61 5053
99 5127
24 42 3
64 41 52
01 41 53
46 41 54
85 41 59
O8 42 4
32 42 0
61 42 5
99 41 47
S 57 32 E 1697 96
S 57 44 E 1764
S 57 7 E 1831
S 56 56 E 1898
S 56 44 E 1964
S 56 10 E 2031
S 55 40 E 2098
S 55 12 E 2165
S 54 31E 2232
S 54 7 E 2299
77
47
22
90
66
65
62
55
39
0 O0
000
0 O1
0 oo
0 O0
0 O1
0 O1
0 O0
0 O0
0 oo
939 15 S 1416 50 E 1699 55 S 56 27 E
974
1010
1047
1083
1120
1158
1196
1234
1273
94 S 1473
89 S 1529
29 S 1585
77 S 1641
69 S 1697
30 S 1752
29 S 1807
82 S 1862
84 S 1916
08 E 1766
41E 1833
47 E 1900
38 E 1966
08 E 2033
56 E 2100
74 E 2167
47 E 2234
74 E 2301
49 S 56 30 E
30 S 56 32 E
14 S 56 33 E
90 S 56 34 E
73 S 56 34 E
74 S 56 32 E
72 S 56 3O E
63 S 56 27 E
43 S 56 24 E
6000 O0 5249 52 5202 52 41 51
6100 O0 5323
6200 O0 5396
6300 O0 5470
6400 O0 5543
6500 O0 5616
6600 O0 5690
6700 O0 5763
6800.00 5836
6900.00 5909
51 5276
84 5349
08 5423
32 54.96
64 5569
O0 5643
23 5716
47 5789
79 5862
51 42 46
84 42 53
08 42 56
32 42 54
64 42 48
O0 42 51
23 42 53
47 42 49
79 42 55
S 54 10 E 2366 06
S 52 16 E 2433
S 51 41E 2501
S 51 8 E 2569
S 50 28 E 2637
S 49 53 E 2705
S 49 45 E 2772
S 49 18 E 2840
S 49 4 E 29O8
S 48 34 E 2976
32
27
29
27
11
90
78
63
35
o Ol
0 O1
0 O0
0 01
0 O1
0 O0
0 O1
0 O0
0 O0
0 O0
1312 95 S 1970 73 E 2368 04 S 56 20 E
1353
1395
1437
1480
1524
1568
1612
1656
1701
28 S 2024
19 S 2078
66 S 2131
69 S 2184
26 S 2236
08 S 2288
33 S 234O
81S 2391
63 S 2442
57 E 2435
12 E 2503
33 E 257O
10 E 2638
30 E 2706
24 E 2773
O0 E 2841
56 E 2909
7O E 2976
21 S 56 14 E
02 S 56 7 E
88 S 56 0 E
70 S 55 52 E
37 S 55 43 E
97 S 55 35 E
69 S 55 26 E
39 S 55 17 E
96 S 55 8 E
7000 O0 5982 93 5935 93 43 9
7100
7200
7300
7400
7500
7600
7700
7800
7900
O0 6055
O0 6129
O0 62O2
O0 6277
O0 6351
O0 6426
O0 6502
O0 6577
O0 6653
97 6008 97 42 40
50 6082 50 42 59
87 6155 87 42 12
22 6230 22 41 57
83 6304 83 41 26
79 6379.79 41 22
O1 6455.01 41 7
56 6530.56 40 46
85 6606.85 40 8
S 48 8 E 3O44 22
S 48 22 E 3112
S 48 6 E 3179
S 49 5 E 3247
S 49 28 E 3313
S 51 17 E 3380
S 51 14 E 3446
S 50 58 E 3512
S 51 3 E 3577
S 55 5 E 3642
18
61
21
87
30
41
23
65
28
0 O0
0 O1
0 O1
0 02
0 O0
0 O1
0 O0
0 O0
0 O2
0 O2
1746 98 S 2493 63 E 3044 69 S 54 59 E
1792
1837
1882
1926
1969
2010
2051
2093
2131
51S 2544
62 S 2595
87 S 2643
40 S 2696
10 S 2747
42 S 2799
82 S 2850
18 S 2901
54 E 3112
12 E 3179
81E 3247
57 E 3313
65 E 3380
36 E 3446
62 E 3512
44 E 3577
86 S 2953.22 E 3642
52 S 54 5O E
86 S 54 42 E
38 S 54 34 E
99 S 54 28 E
38 S 54 22 E
47 S 54 19 E
27 S 54 15 E
68 S 54 12 E
3O S 54 11E
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
COMPUTATION DATE: 7-JUL-94 PAGE 3
DATE OF SURVEY: 06-JUL-1994
KELLY BUSHING ELEVATION: 47.00 FT
ENGINEER: T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MZN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
8000 O0 6729 73 6682 73 41 7
8100
8200
8300
8400
8500
8600
8700
8800
8900
O0 6804
O0 6878
O0 6953
O0 7027
O0 7101
O0 7174
O0 7247
O0 7321
O0 7395
33 6757
72 6831
19 6906
68 6980
54 7054
61 7127
90 7200
44 7274
31 7348
33 42 1
72 41 52
19 41 53
68 41 49
54 42 50
61 43 5
90 42 46
44 42 38
31 42 14
S 55 42 E 3707 38
S 57 28 E 3773
S 57 8 E 3840
S 56 47 E 3907
S 56 39 E 3973
S 55 55 E 4041
S 54 56 E 4109
S 54 37 E 4177
S 54 35 E 4245
S 54 23 E 4312
88
6O
25
89
25
49
52
29
68
o 02
0 O1
0 O0
0 O0
0 O1
o O1
0 O1
0 O0
0 O0
0 O0
2168 99 S 3006 72 E 3707 41 S 54 12 E
2205
2241
2277
2314
2351
2390
2429
2469
2508
30 S 3062
40 S 3118
79 S 3174
36 S 3230
73 S 3286
53 S 3342
82 S 3398
13 S 3453
32 S 35O8
54 E 3773
78 E 3840
73 E 3907
54 E 3973
64 E 4041
80 E 4109
34 E 4177
55 E 4245
38 E 4312
92 S 54 15 E
66 S 54 18 E
33 S 54 20 E
99 S 54 23 E
36 S 54 25 E
62 S 54 26 E
65 S 54 26 E
42 S 54 26 E
82 S 54. 26 E
9000 O0 7469 42 7422 42 42 5
9100 O0 7543
9200 O0 7618
9300 O0 7693
9400 O0 7768
9500 O0 7844
9600 O0 7918
9700 O0 7992
9800 O0 8066
9900 O0 8141
77 7496
35 7571
20 7646
44 7721
03 7797
70 7871
80 7945
97 8019
32 8094
77 41 54
35 41 44
20 41 13
44 40 58
03 41 7
70 42 8
80 42 11
97 41 59
32 41 48
10000 O0 8216 12 8169 12 41 28
10100 O0 8291
10200 O0 8366
10300 O0 8442
10400 O0 8518
10500 O0 8595
10600 O0 8672
10700 O0 8750
10800 O0 8830
10900
20 8244
63 8319
50 8395
91 8471
67 8548
98 8625
60 8703
15 8783
O0 8911 45 8864
20 41 21
63 40 54
50 40 15
91 39 58
67 39 43
98 39 8
60 38 52
15 35 55
45 35 19
11000.00 8993 30 8946.30 34 55
11100.00 9075 31 9028.31 34 55
11164.00 9127 79 9080.79 34 55
S 54 37 E 4379 82
S 54 34 E 4446
S 54 17 E 4513
S 54 1E 4579
S 53 43 E 4645
S 53 26 E 4710
S 53 11E 4777
S 52 33 E 4844
S 52 20 E 4911
S 51 52 E 4978
69
3O
62
49
95
46
59
65
48
S 52 1E 5044 81
S 52 7 E 5110
S 52 4 E 5176
S 52 1E 5241
S 51 56 E 5306
S 51 51E 5370
S 51 54 E 5433
S 52 2 E 5496
S 49 4 E 5556
S 49 17 E 5614
83
44
55
O3
07
46
47
93
93
S 49 48 E 5672.19
S 49 48 E 5729.27
S 49 48 E 5765.80
0 O0
0 O0
0 O0
00l
o Ol
0 O2
0 O1
0 O0
0 O1
0 O1
0 O0
0 O1
0 O1
0 O2
0 O1
0 O1
0 O0
0 O2
0 O1
0 O1
O. O0
0.00
O. O0
2547 31S 3563 04 E 4379 96 S 54 26 E
2586 06 S 3617
2624 83 S 3671
2663 68 S 3725
2702 50 S 3778
2741 37 S 3831
2781 17 S 3884
2821 72 S 3938
2862 59 S 3991
2903 62 S 4044
53 E 4446
71E 4513
46 E 4579
68 E 4645
35 E 4711
63 E 4777
16 E 4844
36 E 4911
15 E 4978
83 S 54 26 E
45 S 54 26 E
76 S 54 26 E
63 S 54 26 E
O9 S 54 25 E
58 S 54 24 E
71 S 54 23 E
75 S 54 21E
57 S 54 19 E
2944 55 S 4096 41E 5044 89 S 54 17 E
2985.17 S 4148
3025.54 S 4200
3065 54 S 4251
3105 28 S 4302
3144 88 S 4352
3184 04 S 4402
3222 81S 4452
3261 26 S 4499
3299 52 S 4543
49 E 5110
26 E 5176
68 E 5241
50 E 5306
89 E 5370
79 E 5433
50 E 5496
31E 5556
19 E 5614
89 S 54 16 E
49 S 54 14 E
59 S 54 12 E
06 S 54 11E
O9 S 54 9 E
48 S 54 8 E
48 S 54 6 E
94 S 54 4 E
93 S 54 1E
3336.70 S 4586.95 E 5672.19 S 53 58 E
3373.65 S 4630.66 E 5729.27 S 53 55 E
3397.29 S 4658.64 E 5765.81 S 53 54 E
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
COMPUTATION DATE: 7-JUL-94
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0 O0
O0 999
O0 1986
O0 2937
O0 3765
O0 4505
O0 5249
O0 5982
O0 6729
O0 7469
PAGE 4
DATE OF SURVEY: 06-JUL-1994
KELLY BUSHING ELEVATION: 47.00 FT
ENGINEER: T. WEST
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPAR.TURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
1000
2000
3000
4000
5000
6000
7000
8000
9oo0
N 0 0 E
S 56 7 E 20
S 49 31E 174
S 57 2 E 474
S 57 16 E 1026
S 57 32 E 1697
S 54 10 E 2366
S 48 8 E 3044
S 55 42 E 3707
S 54 37 E 4379
0 0
57 4 17
77 11 23
94 24 3
93 40 49
96 42 3
52 41 51
93 43 9
73 41 7
42 42 5
-47 O0
57 952
77 1939
94 2890
93 3718
96 4458
52 5202
93 5935
73 6682
42 7422
0 O0
35
O6
69
98
96
O6
22
38
82
10000.00 8216.12 8169.12 41 28
11000.00 8993.30 8946.30 34 55
11164.00 9127.79 9080.79 34 55
S 52 1 E 5044.81
S 49 48 E 5672.19
S 49 48 E 5765.80
0 O0
0 O1
0 O0
0 O2
0 O1
0 O0
0 O1
0 O0
0 02
0 O0
0 O0 N
8
106
277
581
939
1312
1746
2168
2547
2O S 19
96 S 137
52 S 385
lO S 847
15 S 1416
95 S 1970
98 S 2493
99 S 3006
31S 3563
19 E 20
44 E 174
12 E 474
24 E 1027
50 E 1699
73 E 2368
63 E 3044
72 E 3707
04 E 4379
0 O0 E 0 O0 N 0 0 E
87 S 66 51E
15 S 52 7 E
7O S 54 13 E
37 S 55 33 E
55 S 56 27 E
04 S 56 20 E
69 S 54 59 E
41 S 54 12 E
96 S 54 26 E
0.00
0.00
0.00
2944.55 S 4096.41E 5044.89 S 54 17 E
3336.70 S 4586.95 E 5672.19 S 53 58 E
3397.29 S 4658.64 E 5765.81 S 53 54 E
COMPUTATION DATE' 7-JUL-94 PAGE 5
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 06-JUL-1994
KELLY BUSHING ELEVATION' 47.00 FT
ENGINEER' T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG MZN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
47 O0
147 O0
247 O0
347 01
447 01
547 02
647 03
747 07
847 16
0 oo
47 O0
147 O0
247 O0
347 O0
447 oo
547 O0
647 oo
747 O0
847 oo
-47 oo
0 O0
100 O0
200 O0
300 O0
400 O0
500 O0
600 oo
700 oo
800 O0
0 0 N 0 0 E
0 18 N 55 53 E
0 22 N 77 30 E
0 21 S 86 12 E
0 27 S 86 21E
0 35 S 83 S1E
0 38 S 80 11E
1 5 S 69 2 E
2 14 S 63 3 E
2 39 S 61 58 E
O. O0
0.00
0.42
0 85
1 46
2 23
3 13
4 38
7 28
11 53
0 oo
0 O0
0 O0
o O0
0 O0
o OO
0 O0
0 O1
0 O1
0 O0
0 oo N
0 O0 N
0 07 N
0 14 N
0 08 N
0 02 N
0 09 S
0 46 S
168 S
3 66 S
0 O0 E
0 O0 E
0 57 E
1 16 E
1 86 E
2 78 E
3 80 E
5 09 E
7 78 E
11 59 E
0 oo N 0 0 E
0
0
1
1
2
3
5
7
12
O0 N 0 0 E
57 N 82 37 E
17 N 83 1E
86 N 87 33 E
78 N 89 30 E
80 S 88 34 E
11 S 84 51E
96 S 77 49 E
lB S 72 29 E
947 30 947 O0
1047 58 1047
1147 98 1147
1248 60 1247
1349 50 1347
1450 51 1447
1551 91 1547
1653 75 1647
1755 62 1747
1857 50 1847
O0 1000
O0 1100
O0 1200
O0 1300
O0 1400
O0 1500
O0 1600
O0 1700
O0 1800
900 O0 3 34
O0 4 50
O0 S 29
O0 7 19
O0 7 52
O0 8 28
O0 10 29
O0 11 2
OO 10 S8
O0 11 6
S S8 7 E
S 54 16 E
S 51 46 E
S 45 31E
S 44 33 E
S 45 33 E
S S2 10 E
S 53 17 E
SSl 39 E
S 51 2 E
16 74
24 14
33 13
44 19
57 48
71 51
88 22
107 44
126 89
146 36
0 02
0 O1
0 O1
0 O1
0 O0
0 O1
0 02
0 oo
0 O0
0 O0
6 24 S
10 37 S
15 78 S
23 10 S
32 67 S
42 77 S
53 67 S
65 24 S
77
89
16 16 E
22
29
37
47
57
7O
85
06 S 100
24 S 116
30 E 24
49 E 33
83 E 44
31E 57
31E 71
06 E 88
41E 107
86 E 126
07 E 146
17 32 S 68 53 E
60 S 65 4 E
45 S 61 50 E
33 S 58 35 E
50 S 55 23 E
51 S 53 16 E
25 S 52 33 E
47 S 52 38 E
93 S 52 37 E
41 S 52 27 E
1959 44 1947 O0 1900 O0 11 18
2061 46 2047
2163
2266
2370
2474
2579
2686
2793
2901
57 2147
27 2247
25 2347
65 2447
96 2547
59 2647
65 2747
14 2847
O0 2000
O0 2100
O0 2200
O0 2300
O0 2400
O0 2500
O0 26OO
O0 2700
O0 2800
O0 11 31
O0 11 52
O0 14 56
O0 16 26
O0 17 8
O0 19 29
O0 20 43
O0 21 9
O0 22 9
S SO 2 E
S 49 23 E
S 49 12 E
S 53 16 E
S 56 17 E
S 56 24 E
S 57 2 E
S 57 32 E
S 56 49 E
S 56 45 E
166 10
186 23
206 81
230 10
258 57
288 52
321 51
358.42
396.61
435.98
0 O0
0 O0
0 01
0 O4
0 O0
0 01
0 03
0 O0
0 01
O. 02
101 80 S 131 35 E 166 18 S 52 13 E
114
128
143
159
175
194
214
234
256
90 S 146 71E 186
40 S 162 35 E 206
09 S 180 45 E 230
38 S 203 81 E 258
99 S 228 76 E 288
17 S 256 33 E 321
03 S 287.53 E 358
73 S 319.70 E 396
32 S 352.68 E 435
35 S 51 56 E
98 S S1 40 E
30 S 51 35 E
73 S 51 58 E
63 S 52 26 E
57 S 52 51E
44 S 53 20 E
61 S 53 43 E
98 S 53 59 E
3009.91 2947.00 2900 O0 24 16
3120 86 3047.00 3000 O0 27 4
3233
3349
3467
3587
3712
3842
3975
4108
89 3147.00 3100 O0 28 40
67 3247 O0 3200 O0 31 37
81 3347 O0 3300 O0 32 36
87 3447 O0 3400 O0 34 44
23 3547 O0 3500 O0 38 6
07 3647 O0 3600.00 41 4
O0 3747 O0 3700.00 40 46
06 3847 O0 3800.00 42 9
S 57 6 E
S 56 51E
S SS 58 E
S 55 45 E
S 55 4O E
S 56 7 E
S 57 13 E
S 57 49 E
S 57 27 E 1010
S 58 4O E 1098
478.71
526.65
579.30
637 58
700 46
766 85
840 65
923 29
68
27
O. 03
0 O2
0 03
0 02
0 O1
0 02
0 02
0 O1
0 O1
0 O1
279.71S 388 49 E 478.71 S 54 15 E
305.8O S 428
334.92 S 472
367 77 S 520
403 21S 572
440 54 S 627
481 12 S 689
525 61S 759
572 29 S 833
619 25 S 9O7
80 E 526.67 S 54 30 E
72 E 579.34 S 54 41 E
90 E 637.65 S 54 47 E
87 E 700.54 S 54 52 E
81E 766.96 S 54 57 E
55 E 840.81 S 55 6 E
38 E 923.54 S 55 19 E
49 E 1011.05 S 55 32 E
64 E 1098.76 S 55 42 E
COMPUTATION DATE' 7-JUL-94 PAGE 6
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 06-JUL-1994
KELLY BUSHING ELEVATION' 47.00 FT
ENGINEER' T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MZN DEG MZN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
4244 48 3947 O0 3900 O0 43 6
4380
4516
4651
4785
4920
5O55
5189
5324
5458
79 4047
12 4147
05 4247
74 4347
55 4447
25 4547
75 4647
16 4747
51 4847
O0 4000
O0 4100
O0 4200
O0 4300
O0 4400
O0 4500
O0 4600
O0 4700
O0 4800
O0 42 36
O0 42 13
O0 42 19
O0 42 3
O0 42 6
O0 42 1
O0 41 50
O0 41 53
O0 41 56
S 58 36 E 1190 74
S 57 59 E 1283
S 57 40 E 1374
S 57 27 E 1464
S 57 31E 1554
S 57 21E 1644
S 57 44 E 1734
S 57 9 E 1824
S 56 56 E 1914
S 56 26 E 2003
12
O9
51
57
8O
87
64
33
95
o O1
0 O1
0 O0
0 O1
0 O0
o O0
0 O0
0 O0
0 O0
0 oo
667 44 S 986 93 E 1191 43 S 55 56 E
716
764
813
861
910
958
1007
1086
1105
14 S 1065
76 S 1142
35 S 1219
88 S 1295
46 S 1371
94 S 1447
17 S 1523
09 S 1598
30 S 1674
73 E 1284
86 E 1375
32 E 1465
39 E 1555
63 E 1646
74 E 1736
66 E 1826
99 E 1916
O1E 2005
O0 S 56 6 E
13 S 56 13 E
70 S 56 18 E
91 S 56 22 E
30 S 56 25 E
52 S 56 29 E
45 S 56 32 E
27 S 56 33 E
99 S 56 34 E
5593 16 4947 O0 4900 O0 42 5
5727
5862
5996
6132
6268
6405
6541
6677
6814
82 5047
44 5147
61 5247
02 5347
48 5447
O2 5547
38 5647
84 5747
35 5847
O0 5000
O0 5100
O0 5200
O0 5300
O0 5400
O0 5500
O0 5600
O0 5700
O0 5800
O0 41 58
O0 41 54
O0 41 51
O0 42 5O
O0 42 57
O0 42 53
O0 42 48
O0 42 55
O0 42 48
S 55 42 E 2094 07
S 55 1E 2184 23
S 54 14 E 2274 34
S 54 9 E 2363 80
S 52 3 E 2455 O6
S 51 19 E 2547
S 50 26 E 2640
S 49 53 E 2733
S 49 2O E 2825
S 48 59 E 2918
84
68
15
74
35
00l
o O0
0 O1
0 O1
0 O0
o O1
0 O1
0 O0
o oo
o O0
1155 71S 1748 77 E 2096.16 S 56 32 E
1206
1259
1311
1366
1424
1482
1542
1602
1663
94 S 1823
18 S 1896
63 S 1968
63 S 2041
21S 2114
87 S 2186
38 S 2257
50 S 2328
21S 2398
O0 E 2186.33 S 56 30 E
43 E 2276.40 S 56 25 E
90 E 2365 79 S 56 20 E
75 E 2456 91 S 56 12 E
59 E 2549 48 S 56 2 E
73 E 2642 10 S 55 51E
79 E 2734 33 S 55 40 E
56 E 2826 69 S 55 28 E
91 E 2919 08 S 55 16 E
6950 83 5947 O0 5900 O0 42 59
7087
7223
7359
7493
7626
7759
7891
8022
8157
79 6047
93 6147
37 6247
56 6347
91 6447
63 6547
05 6647
99 6747
40 6847
O0 6000
O0 6100
O0 6200
O0 6300
O0 6400
O0 6500
O0 6600
O0 6700
O0 6800
O0 42 48
O0 42 59
O0 41 56
O0 41 26
O0 41 17
O0 40 52
O0 40 2
O0 41 30
O0 41 56
S 48 19 E 3010 82
S 48 19 E 3103
S 47 58 E 3195
S 49 26 E 3286
S 51 12 E 3376
S 51 8 E 3464
S 50 47 E 3551
S 54 58 E 3636
S 56 28 E 3722
S 57 18 E 3812
93
84
8O
04
16
30
52
55
2O
0 O0
0 O2
0 O1
0 O0
0 O1
0 O0
0 O1
0 02
0 O3
0 O1
1724 60 S 2468 60 E 3011 35 S 55 4 E
1787
1848
1908
1966
2021
2076
2128
2177
2225
O1S 2538
53 S 2607
74 S 2675
44 S 2744
56 S 2813
51S 2880
55 S 2948
46 S 3019
99 S 3094
35 E 3104
25 E 3196
93 E 3286
33 E 3376
20 E 3464
98 E 3551
50 E 3636
32 E 3722
88 E 3812
29 S 54 51E
06 S 54 4O E
93 S 54 3O E
12 S 54 23 E
21 S 54 18 E
33 S 54 13 E
54 S 54 10 E
58 S 54 12 E
25 S 54 16 E
8291 69 6947 O0 6900.00 41 53
8425
8562
8698
8834
8969
9104
9238
9371
9503
98 7047
16 7147
77 7247
70 7347
77 7447
33 7547
40 7647
56 7747
94 7847
O0 7000.00 42 5
O0 7100.00 43 9
O0 7200.00 42 46
O0 7300.00 42 26
O0 7400.00 42 9
O0 7500.00 41 54
O0 7600.00 41 41
O0 7700.00 41 13
O0 7800,00 41 10
S 56 47 E 3901.71
S 56 31 E 3991 24
S 55 13 E 4083
S 54 38 E 4176
S 54 29 E 4268
S 54 34 E 4359
S 54 34 E 4449
S 54 9 E 4538
S 53 54 E 4626
S 53 24 E 4713
63
68
74
54
58
86
81
55
0 O0
0 O2
0 O1
0 O0
0 O1
0 O0
0 O0
0 O1
0 O1
0 O1
2274.75 S 3170 09 E 3901.78 S 54 20 E
2323.92 S 3245
2375 72 S 3321
2429 34 S 3397
2482 74 S 3472
2535 56 S 3546
2587 74 S 3619
2639 78 S 3692
2691 46 S 3763
2742 91S 3833
03 E 3991.34 S 54 24 E
59 E 4083.75 S 54 26 E
65 E 4176.81 S 54 26 E
65 E 4268.88 S 54 26 E
51 E 4359.68 S 54 26 E
89 E 4449.72 S 54 26 E
44 E 4539.01 S 54 26 E
60 E 4626.95 S 54 26 E
44 E 4713.68 S 54 25 E
COMPUTATION DATE: 7-JUL-94 PAGE 7
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY: 06-JUL-1994
KELLY BUSHING ELEVATION: 47.00 FT
ENGINEER: T. WEST
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MZN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MZN
9638 19 7947 O0 7900 O0 42 14
9773
9907
10041
10174
10305
10436
10566
10695
10820
13 8047
61 8147
15 8247
07 8347
89 8447
63 8547
48 8647
37 8747
79 8847
O0 8000
O0 8100
O0 8200
O0 8300
O0 8400
O0 8500
O0 8600
O0 87OO
O0 8800
O0 42 1
O0 41 46
O0 41 14
O0 40 46
O0 40 11
O0 39 53
O0 39 17
OO 38 58
O0 35 46
S 52 59 E 4803 10
S 52 25 E 4893 68
S 51 52 E 4983 55
S 52 4 E 5071 99
S 52 7 E 5159 51
S 51 59 E 5245
S 51 47 E 5329
S 51 57 E 5412
S 52 5 E 5493
S 48 53 E 5569
35
52
29
57
06
0 O1
0 O1
0 01
0 O1
0 O2
0 02
0 O0
0 O1
0 02
0 O1
2796 58 S 3905 15 E 4803 23 S 54 24 E
2851
2906
2961
3015
3067
3119
3170
3221
3269
61S 3977
75 S 4048
28 S 4117
13 S 4186
88 S 4254
81S 4320
97 S 4386
02 S 4450
25 S 4508
12 E 4893
14 E 4983
84 E 5072
90 E 5159
68 E 5245
98 E 5329
ll E 5412
21E 5493
49 E 5569
79 S 54 22 E
63 S 54 19 E
06 S 54 17 E
56 S 54 14 E
39 S 54 12 E
55 S 54 lO E
31 S 54 8 E
58 S 54 6 E
06 S 54 3 E
10943.51 8947.00 8900.00 35 1
11065.48 9047.00 9000.00 34 55
11164.00 9127.79 9080.79 34 55
S 49 40 E 5639.93
S 49 48 E 5709.56
S 49 48 E 5765.80
0.01
0.00
0.00
3315.81 S 4562.26 E 5639.93 S 53 59 E
3360.90 S 4615.57 E 5709.57 S 53 56 E
3397.29 S 4658.64 E 5765.81 S 53 54 E
ARCO ALASKA, INC.
P2 - 54
POINT MCZNTYRE
NORTH SLOPE, ALASKA
MARKER
LAST READING GCT
TOTAL DEPTH
COMPUTATION DATE: 7-JUL-94
INTERPOLATED VALUES FOR CHOSEN HORIZONS
DATE OF SURVEY
KELLY BUSHING ELEVATION
ENQINEER
PAGE 8
06-JUL-1994
47.00 FT
T. WEST
SURFACE LOCATION = 551' FNL ~ 1233~ FWL, SEC14 T12N R14E
MEASURED DEPTH TVD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST
10970.20 8968.88 8921.88 3325.69 S 4573.93 E
11164.00 9127.79 9080.79 3397.29 S 4658.64 E
COMPUTATION DATE: ?-JUL-94 PAGE 9
ARCO ALASKA, INC.
P2 - 54
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY: 06-JUL-1994
KELLY BUSHING ELEVATION: 47.00 FT
ENGINEER: T. WEST
************ STRATIGRAPHIC SUMMARY ************
MARKER
SURFACE LOCATION = 551~ FNL ~ 1233~ FWL, SEC14 T12N R14E
MEASURED DEPTH TVD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST
LAST READING GCT
TOTAL DEPTH
10970.20 8968.88 8921.88 3325.69 S 4573.93 E
11164.00 9127.79 9080.79 3397.29 S 4658.64 E
FINAL WELL LOCATION AT TO:
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET DEG MIN
11164.00 9127.79 9080.79 5765.81 S 53 54 E
COMPANY
ARCO ALASKA, INC.
FIELD P2 - 54
WELL
POINT MCINTYRE
COUNTRY USA
RUN ONE
DATE LOGGED
06-JUL-1994
REFERENCE
94250
All interpretations are opinions based on inferences from electrical or other measurements and we cannot, and do not
guarantee the accuracy or correctness of any nterpretat OhS. and we shall not, except in the case of gross or wilfull
negligence on our part. be liable or responsible for any loss. costs, damacles or expenses incurred or sustained by
anyone resu ting from any interpretation made by any of our off cars. agents or employees. These interpretations are
also subject to our General Terms and Cond dons as set out in our current price Schedule.
_ _
HELL: P2- 5'4
(551' FNL, 1233' FWL, .SEC 14"--'..NN 12N, RNG 14E)
HORZZONTAL PROdECT~O~
3000
2O0O
1000
-1000
-2000
-3000
-4000
SOUTH - 5000
SCALE = 1 / 1000 ~N/~'r
~ .... ~ ?'~" '~ ...... ?"~ ..... !"?"!"! .... ?'~"~'i .... ~"T~" ,":"~"~'i '"!'i'? i "T"i'"! ~ '? ;'i' '! ...... !'"~' :"?"! '~ ! ....... ~ ~ .....
i"i'"~ ! ..... i'i'"i'"i ..... i'-i'":'-'~ ...... F'~"T': '"~'":'"~'"~ ..... i'"~'"~ :. "~'":"~"? !"~":'"i" ?'~'''~''':'' ~' ':' :'"!"': ''~'''!''': ............. :"? .... : ~ .......... :": ....... ' ....... :' '
: ' : : ' ~ ~ ~ . .i : i : ! i . . ~ : i : ; : : : : : : ! ' : - : : ' : :
i'-i~ !"~. ---'. "."-i'--:: ...... !'-'~-'?'-; ...... k"k-';'-'~ ...... ~" ~--'~'-: ..... ~'"??"~ ~' T'-!'"~ ..... ~"i' '~'"! ...... F-'i'":" ! .... i'-'~'"!'"i ..... !--'k"~'"!'" ~ : : : "~' ''! ...... ' ' '
!'-i ! !' ';'":"i'-i ...... !-"i"i---! ..... !'--i'-'i "i .... i'-i ':'": .... !'"!"i'-i ..... i-'i"i"i .... i"i ;"i- i -i---!-'i'-i- 'i' '!"i "~ ..... !"i'-i'"~ :'"'"'"": ~'"." ': .......... ~ ........
-i ....... i ......... i.-.~...i..-i.-i.-.i-..~.--i-..~ ...... ~ .............................. ~ ...... ~.-., .......... - .............. ~..-~ .............. i--.~ ....... ~-..~--.~ ............ i .............. ~...L.~...i ..... ~ ..... '-..i . .L..~ ............ ...... ~ ......
.... !' ~ 'i'"~'"~."T--!'"'"-r"!'-'F"! ..... :'-'~'"!-'-! ..... ~ ": "~ .......... ?' F";-"-: ...... ~-'-;'"~'"~ ...... F";' '?"~ ..... :-"F": ; '"~'"i--'!TM .... ~'":-"!'"; ...... i" !'"' ': .... :'": ................. : . ' '.' .
- ~.--~--.i--; .... ~ .-i---i ....... i-.-i---:---i---~ ---:.---~---~---~ ...... ~.--~-.-; ......... ~---~ ~ ...... ~-- ;---:---~ .... ~---¥.-~ ' ---;---~.--~---~ ...... ~.--~-.-i --.~-.-~---~..-~ ...... ~-.-~...~.-.~ .... ~'--i.. ~ ....... ~' '- ....... : .... ?
· :~..ii .: i--+--~ ...... ;;; ......................... L..~ ..... !-i'"!"-: .... i-'?'-'~--'~ ......................... -"~ ......... ' : : !~
. · .................. . : - . : . . . --~"'~ ............. ~..¥..?..~ ................... ~ .............................. : .....
?.i-- ! .... ~---i--+--i ...... ~---~---i-- i ..... i--!--i-- ~ .... ~---i .......... !---i---! ...... ~--!--.?.-.i · · .! ........ ~ ..... !---~ ~ :- ?--~---~---~ ......... !--.!--.i · -: ...... ~ .- -: ....... : ....
: : ~ : ~ : ' ! '. i . :. I ~ ~ ~ : ! i~ ' ' : : ~ - : ~ : .....
· , ; · :.4..;..; .... i..+..i...; ...... :...: ..... ~ ...... ~ ........ ~·~ .: · .~ ~ : :--.-.; ~ ...... : .: ........... ..... . .... :..,~...i ....... ~ ......... : ..: ..... .. .......
' ;'"!' i ' !-' !'"!'"! ..... !'";'--~-"; ...... :'"?"? ......... ~--: ' :-': '-'~'":' ~ ...... ?'"!"-' ' > .... ~" ;' : :' ':'"? ~ .... :" ~ ":" : ..... ?'"?'":"; ...... . ....... : ....... '" .". ....... ~' . ....... ' ....
':, ~ ~ .... :...i--.i.-!...i--.i...i---! i . :...i...?...~...i i ..... '...i...i...: . i..~..~, i .... ~.:. ..... : ..:..: .... : .... :...;..i.: .... : ~..i ....... ,..:...:..~ ... i.: ............... -.i
~. :: i. ;. ,. L i..:,..L.[...::...i...L./. ..... :....i../....i ..... i..: ~ ....... :... i..: ~ ..... :. ::. i .... :. ...... : ..... :- -:--: - : :-~. -~-. i.-.i ......... ~ -:...:- ...... .... : ....
· : :~:~ ':~'i~ i::' : :i: ~::: : : '!:: :i!. ! . .
:..:: .... i...L.;...,...I...~.._:....;.._:..i...i...i...i...i. ,.:...L.: ..... :...i..~ ......... :...~..: ......... ~..~. i...~ ......... i..: ......... ~..i ....... : ....... :....: ....... : ........ :~..: ..... '.'. ............ : : .
::: ...... : -! ...... !-'-i'"i ........ ;":': ...... :'6'n'h61 ' ': ............. ! ..... i ': '" !"i' '!': ..............................
: i: :: : :: ~ 3,~: 2oot3.,, - ....
: !'.i:: :~:: i!:' . i:i ~'s,,:]~ooo:i :: i ii ......
........ ~'?T": "~"-~-":'" .......... 5': :' -,-,': ' -i-~: -'"'",,j~ '?': - f ; '" ~ i ........ ;"?': ..... :": ' [ i .... ~ '
: ; : ; : .... : .... :':'" : : : : : ' :-: :~i.i.~::: : ; ' ' ' : ' ' ': : ; :': : '
..i.;...! . . ! i---i---i ...... !.-.i.-.i---i...L-:--.i.-.i..-: :.; ..... i.-i-~ ..... ~-: ----:~--..:~ i.-~ooo-~- .............. ;. ..... ~.--:.--~-: ......... ~ ..... :
::!:.:i.:::::: ::::::::::::::::::::::::::::::::::::::::::::::
.-;': .::'i:::;:-: ::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ': :::' '.:'!X :,:o';;::: ....... :"::'":."::::.:
......... : ................... :...:..L ...... i...:...~...: ....... ~ ......... i : .............. : .................................. ~ ........................ : . ..: ...................
· :
'' ' ] "' ~ ....... ! ...... ! ...... ~ ...... ] ........ ' ...............................
I
!
1
-2000 -1000 0 1000 2000 3000 4000 5000 6000
VVE s"'r EAST
WELL' P2-54 -
(551' FNL, 1233' FI~L, SEC 14, TWI'( 12N, RNG 14E)
VERTICAL PROJECTION
306.0
- 1000 0 0 1000 2000 3000 4000 5000 6000
7000
128.0
PROJECTION ON VERTICAL PLANE 306.0 - 1260 SCALED IN VERTICAL DEPTHS HO~IZ SCALE = I / 1000 IN/FT
Well
Name ~ Data Description
d~,_ Static BHP Survey-Press/Temp/GR/CCL 1
Perforation Record 3-3/8" HSD 4lB H-JII 6 SPF 1
t/P2-23 Static BHP'S~rvey-Press/Temp/GR 1
v ~-, Perforation Record 3- /8 HSD 4lB
~29 Static B~ Su~-Press/ emp/
,/. Perforation ~~3- /o HSD41B~H6SPF
P2-31~ Static Pr~ure Su~ey
~-42 Dual Burst TDT-P Log (Borax ~jection Log)
~~ ~t~-/~w Log (~T-P-GR-CCL) 1
~-~ ~jection P~le Log (Press-Temp-SP:-GR) 1
P~4 GR:C~ewel~ Log 1
~4' Sta{ic Pr~ure Su~ey -Press-Temp
Please sign ~/// ~~d return to:
Run #
Date Run
7/24/94
Company
Schlumberger
7/18/94 Schlumberger
7/19/94 Schlumberger
7/18/94 Schlumberger
1 7//~& Schlumberger
-'
I ~~ ,,. Schlumberger
I 8/26/94 Schlumberger
9/13/94 Schlumberger
9/13/94 Schlumberger
7/6/94 Schlumberger
7/6/94 Schlumberger
7/21/94 Schlumberger
7/22/94 Schlumberger
GPMA Engr Aide, ATO-462
ARCO Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Transmittal Number: 745 Page: 2
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] StJSPENDED [] ,NgAN~ED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 94-59
3. Address 8. APl Number
P. 0. Box 196612, Anchorage, Alaska 99519-6612 $0- 029-22470
4. Location of well at surface ~-~-,.~..~..,.._~ .... 9. Unit or Lease Name
551' SNL, 1233' EWL, SEC. 14, T12N, R14E ~~_ , ~':~'~.~. Point Mclntyre
At Top Producing Interval ~,~--.~,-~ I ..... :;~,~ .-.. 10. Well Number
' .... '~ .... [' P2-54
3946'SNL, 617'EWL, SEC. 13, T12N, R14E
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 45.62' I ADL 34624
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
4/29/94 5/10/94 7/22/94I N/A feet MSL I One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey IO. Depth where 888V set 121 i Th'c~ness of Permafrost
11180'MD/9145' TVD 11081'MD/9063'-l'VD ~ [] ~ [] 2074' feet MD 750'(Approx.)
22. Type Electric or Other Logs Run
GR/NEU/DEN/RES/L WD
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 30' 110 30" 260 sx Arcticset (Approx.)
10-3/4" 45.5# NT8OLHE 35' 3940' 13-1/2" 1166 sx CS 111/375 sx "G"
7-5/8" 29. 7# L-80/13CR 31' 11164' 9-7/8" 590 sx Class "G'
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MD)
Gun Diameter 3-3/8" 6 spf 4-1/2", 13CR 10254' 10172'
MD TVD (ss)
10794'-10824' 8780'-8804'
10844'-11008' 8821 '-8958' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.}
7/24/94 I FIowing
Date of Test Hours Tested PROOUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKES IZE IGAS-OIL RATIO
I
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence ot oil, gas or water. Submit core chips.
RECEIVED
L
Aiask~ 0il & Gas Cons. Commission
Anch0ra~o
Submit in duplicate
Form 10-407
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
30.
GEOLOC-~ MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
HRZ 10707' 8711'
Kalubik 10769' 8760'
Kuparuk 10789' 8776'
RECEIVED
-5
Alaska 0ii & Gas Cons. ~,om_mjscbn
31. LIST OF A'I-I'ACHMENTS Anchora~.~c
32. I hereby certify t.hat the foregoing is true and correct to the best of my knowledge
Signed -~~-~~ TitleOrJllJn~_En~_ineerSuoerv[sor Date ~/~'/~ L~-
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: P2-54
BOROUGH: NORTH SLOPE
UNIT: POINT MCINTYRE
FIELD: POINT MCINTYRE
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 04/29/94 05:00
SPUD: 04/29/94 12:30
RELEASE:
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: NABORS 2ES
04/29/94 ( 1)
TD: 110' ( 110)
04/30/94 ( 2)
TD: 745' ( 635)
05/01/94 ( 3)
TD: 3150' (2405)
05/02/94 ( 4)
TD: 3955'( 805)
05/03/94 (5)
TD: 4100' ( 145)
RU 20" DIVERTER
MW: 0.0 VIS: 0
TURNKEY RIG MOVE F/P2-21 T/P2-54. TAKE ON WATER, BUILD
CONTAINMENT F/CUTTINGS PIT. SET ON 20" DIVERTER.
W/O TRUCKS
MW: 8.7 VIS:220
NU DIVERTER & MIX MUD. HELD SFTY MTG. SLIP & CUT DL 59.5'
TEST DVRTR W/AOGCC ON LOCATION. OK. PU BHA #1. FILL HOLE &
CHK. F/LEAKS. C/O 20" CNDCTR T/ll0'. DRLG 13.5 HOL T/352.
CUTTINGS BOX FULL. ALL TRKS LOADED. POOH PU BHA #2 9-5/8"
DYNA DRILL & MWD, RIH. DRLG T/582. DUMP VALVE NOT WORKING.
POOH CHANGE VALVE & RIH. DRLG T/745. W/O GUZZLERS T/CATCH
UP/ALL TRKS FULL.
DRILLING
MW: 9.2 VIS:130
DRLG T/943. W/O GUZZLERS. DRLG T/2491. CBU. SHORT TRIP
T/HWDP. HOLE OK. DRLG T/3150.
RUNNING 10.75 CASG
MW: 9.3 VlS:120
DRILL T/3950. CBU. SHORT TRIP T/2979. SWABBING. RIH REAM &
WASH T/CLEAN OFF BALL. CIRC & COND HOLE. WIPER TRIP T/HWDP.
HOLE OK ON TRIP IN. CBU & ROTATE PIPE/RECIP. T/REMOVE BALL.
POOH T/BHA. LD BHA & CLEAR FLOOR. RU T/RUN 10.75, 45.5#,
NT80LHE BTC CASG. 50 OF 99 JTS RUN BY 6:00AM.
DRILLING
MW: 8.9 VIS: 33
RUN 10.75 45.5# NT80LHE BTC CASG. 99 JTS TOTAL. SHOE @
3940. FC @ 3861. LAND CASG. CIRC & RU BJ. PUMP 50 BBLS
FRESH WATER AHEAD/TEST LINES T/3000. MIX & PUMP 1166 SX
COLD SET @ 12.3 PPG. DROPPED BTTM PLUG/TAIL SLURRY/354 SX
"G" @ 15.7PPG. DROP TOP PLUG & KO W/5BBLS WATER, DISPLACED
W/366 BBLS MUD. CIP @ 12:10 HRS. ON 5/2/94.BUMP PLUG
W/2000. FLOATS HELD OK. FULL CIRC THROUGHOUT JOB. CMT
T/SURFACE 20 BB'S. NO TOP JOB. LD LNDG JT. HOLD SFTY MTG.
ND DVRTD STCK/INSTALL FMC SSH/ NU BOP & FLOW LINE. 30 MIN.
SFTY MTG. TEST BOP 250/5000. WITNESS: B. FOSTER AOGCC. PU
BHA #2. ORIENT MWD. RIH T/3860 CBU. TEST 10.75 CASG T/3000
F/30 MIN. OK. DRLG OUT CMT & SHOE @ 3940. DRILL 10' NEW
HOLE T/3965. LOT TEST T/EMW 12.PPG. DRILL T/4100.
Gas Cons. Commission
Anchora,~e
WELL : P2-54
OPERATION:
RIG : DOYON 14
PAGE: 2
05/04/94 ( 6)
TD: 6813' (2713)
05/05/94 ( 7)
TD: 7700' ( 887)
05/06/94 (8)
TD: 8551' ( 851)
05/07/94 ( 9)
TD: 9842' (1291)
05/08/94 (10)
TD:10570' ( 728)
05/09/94 (11)
TD:10706' ( 136)
05/10/94 (12)
TD:lll80' ( 474)
05/11/94 (13)
TD:lll80' ( 0)
CBU F/BIT TRIP
MW: 9.4 VIS: 46
DRLG F/4100 T/4817. CBU F/SHORT TRIP T/10.75" CASG SHOE
@3940. HOLE OK. DRLG F/4817 T/5811. CBU F/SHORT TRIP, LIGHT
SWABBING IN TIGHT AREAS. DRLG F/5811 T/6811. CBU & CLEAN
HOLE F/BIT TRIP.
DRILLING
MW: 9.3 VIS: 57
DROP SURV & POOH. TIGHT & SWABBING T/SHOE, FILL HOLE THRU
DP. CBU @ SHOE. POOH RETREIVE SURV. STND BACK BHA/READ
MWD/CHANGE BIT. SERV. WEAR RING. MU BHA & RIH T/SHOE. CUT
DL SFTY CHK. BRAKES & INSPECT DL. WASH & REAM BRIDGES
F/4750 T/6813. DRLG & SURV. F/6813 T/7700.
RIH W/ NB MW: 9.5 VIS: 71
CBU. 10 STAND WIPER TRIP. DRLG AND SURVEY F/ 7700-8551'
CBU. POH F/ NEW BIT AND BHA. CHANGE BHA-ORIENT &
CALIBRATE MWD - CHANGE BITS. RIH W/ NB.
DRLG & SURVEYS MW: 9.8 VIS: 71
RIH, TIGHT @ 811 - MAD PASS F/ 8182-8551' DRLG AND
SURVEYS F/ 8551-9406' CBU. 10 STAND WIPER TRIP, NO TIGHT
HOLE. DRLG AND SURVEYS F/ 9406-9842'.
DRLG & SURVEYS MW: 9.9 VIS: 67
DRLG & SURVEYS F/ 9843-10216'. CBU. WIPER TRIP TO SHOE,
TIGHT HOLE F/ 8370-6600' CUT DRLG. LINE. RIH, HOLE
CLEAN. DRLG ANS SURVEYS F/ 10216-10570'.
CLN #1 PIT AFTER DISPLACE MW: 9.8 VIS: 68
DRLG F/ 10570-10706'. CIRC HOLE CLEAN. POH - RETRIEVE MWD
DATA - CHANGE BHA. SERVICE WEAR RING. INSTALL SOURCE IN
ANADRILL & RIH. SERVICE RIG & SAFETY MEETING. RIH. CBU.
PUMP 50 BBL H20 & CHEMICAL SPACER FOLLOWED BY 100 BBL
XANVIS SPACER, DISPLACED W/ KCL MUD.
TD CBU MW: 9.8 VIS: 54
CLEAN MUD PITS #1 & 2. CHANGE OVER TO KCL MUD. DRLG AND
SURVEYS F/ 10706-11180'
LAYING DOWN BHA MW:10.0 VIS: 61
CIRC HOLE CLEAN. WIPER TRIP TO 10363'. MAD PASS F/ BIT
DEPTH 10372-10730' RIH, TIGHT @ 10860'. CIRC HOLE CLEAN.
POH 15 STANDS - PUMP DRY JOB & LAY DOWN DRILL PIPE. LAY
DOWN ALL BHA - REMOVE INFO F/ ANADRILL TOOLS AND SPERRY SUN
TOOLS.
WELL ' P2-54
OPERATION:
RIG : DOYON 14
PAGE: 3
05/12/94 (14)
TD:lll80' ( 0)
05/13/94 (15)
TD:lll80
PB:ll081
05/14/94 (16)
TD:lll80
PB:ll081
05/15/94 (17)
TD:lll80
PB:ll081
LD LANDING JOINT MW: 8.5 VIS: 26
CONTINUE TO CHANGE RAM TO 7 5/8" AND TEST DOOR SEAL. R/U
AND RUN 27 JTS 29.7# 13 CR NSCC AND 244 JTS 7 5/8" 29.7#
NT95LHE NSCC CASING. M/U LANDING JT, TIGHT HOLE. CIRC AND
WORK PIPE DOWN THE LAST 40'. CIRC AND CONDITION MUD, R/U
BJ MATCH MIX CMT. PUMP 20 BBLS 2% KCL WATER. TEST LINES.
L/D LANDING JOINT AND CSG TOOLS.
LAND 4.5" COMP. STRING
MW: 0.0 Seawater
LD CASG EQUIP & CLEAR FLOOR. INSTALL FMC 7-5/8" PACK OFF &
TEST T/5000. OK. CLEAN & STRAP 4.5" 12.6# 13CR NSCR TBG.
RUN 4.5 TBG W/JEWELRY. MU SSSV & CL TEST T/5000 PSI. OK.
CON'T RUNNING TBG. MU FMC TBG HNGR & TEST CL T/5000. OK.
RIG RELEASED
MW: 8.5 Seawater
LAND TBG. TOTAL JTS = 253. 4.5" 12.6#. 13 CR NSCT. TAIL @
10254. XN 610222 X NIPPLES @ 10205,10150. PKR @ 10172, SET
SSSV @ 2074 W/2-WAY CK IN PLACE. RUN IN LDS. CHANGE PIPE
RAMS F/7-5/7" T/4.5 & 7" ND BOP. NU ADAPTER FLNG. TEST
T/5000/ OK. NU TREE/TEST T/5000. RU DRILL SITE MAINT.
LUBCTR. & PULL 2-WAY CHK. RU LITTLE RED'S & PUMP 156 BBLS +
57 BBLS F/FRZ PROTECT. DOWN TBG. DROP BALL ROD. PUMP 87
BBLS DIESEL DOWN ANNULUS (10.75 X 7-5/8) COVER 2200' ANNUL.
PUMP DOWN TBG. SET PKR W/4000. HOLD 30 MIN. BLEED BACK
T/500. PUMP DWN ANNUL. T/3500/HOLD 30 MIN. OK. BLEED T/0 &
SET BPV. CLOSE SSSV. PUMP OUT CELLAR & PITS - SECURE WELL &
RELEASE @ 19:00 HOURS ON 5/13/94.
MW: 8.5 Seawater
SIGNATURE:
)
(dri~ng superintendent
DATE:
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
'COURS
INCLN
DG MN
0 .00 -46.95
313 312.99 266.04
402 401.99 355.04
493 492.99 446.04
580 579.98 533.03
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
670 669.96 623.01
762 761.92 714.97
852 851.84 804.89
939 938.89 891.94
1031 1030.78 983.83
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
1123 1122.98 1076.03
1213 1211.86 1164.91
1306 1304.43 1257.48
1400 1397.22 1350.27
1491 1486.79 1439.84
0 0 N .00 E .00 .00N .00E
0 27 N 28.81 E .15 1.10N .61E
0 22 N 61.27 E .28 1.56N 1.04E
0 35 S 88.83 E .35 1.69N 1.77E
1 4 S 79.01 E .58 1.53N 3.02E
1588 1582.54 1535.59
1682 1674.44 1627.49
1775 1765.97 1719.02
1870 1859.82 1812.87
1965 1952.20 1905.25
1 8 S 68.39 E .24 1.03N 4.69E
2 10 S 65.89 E 1.12 .01S 7.13E
2 41 S 65.32 E .58 1.59S 10.60E
3 42 S 60.45 E 1.21 3.84S 14.92E
5 7 S 58.42 E 1.55 7.47S 21.02E
2056 2042.04 1995.09
2151 2134.66 2087.71
2245 2226.19 2179.24
2336 2313.97 2267.02
2427 2401.69 2354.74
2523 2493.44 2446.49
2619 2583.21 2536.26
2712 2670.73 2623.78
2805 2757.76 2710.81
2897 2842.30 2795.35
5 11 S 52.23 E .60 12.20S 27.86E
6 54 S 44.82 E 2.10 18.48S 34.84E
7 49 S 46.08 E 1.01 26.87S 43.37E
8 6 S 42.73 E .57 36.15S 52.44E
9 25 S 50.23 E 1.93 45.59S 62.48E
2994 2930.71 2883.76
3087 3014.59 2967.64
3182 3098.42 3051.47
3276 3180.93 3133.98
3369 3260.58 3213.63
11 8 S 54.07 E 1.89 56.20S 76.23E
11 22 S 53.84 E .25 66.97S 91.01E
10 39 S 51.06 E .95 77.81S 105.14E
11 4 S 50.01 E .49 89.27S 119.05E
11 13 S 50.36 E .18 100.93S 133.05E
11 28 S 48.37 E .51 112.68S 146.73E
11 38 S 47.96 E .20 125.32S 160.85E
14 16 S 51.85 E 2.95 138.83S 177.01E
16 21 S 57.03 E 2.73 152.74S 196.59E
16 30 S 55.77 E .42 167.06S 218.14E
18 31 S 55.63 E 2.10 183.39S 242.07E
20 32 S 58.07 E 2.29 200.78S 268.76E
20 55 S 55.79 E .95 218.86S 296.51E
21 8 S 56.21 E .29 237.57S 324.25E
23 8 S 54.90 E 2.27 257.04S 352.62E
VERT.
SECT.
.00
-.16
-.08
.44
1.55
3.18
5.77
9.51
14.32
21.39
29.70
39.04
50.88
63.67
77.35
94.70
112.99
130.80
148.79
166.96
25 15 S 55.38 E 2.19 279.75S 385.23E
27 10 S 56.27 E 2.10 302.94S 419.41E
27 37 S 55.41 E .63 327.35S 455.37E
29 55 S 54.97 E 2.44 353.22S 492.57E
32 15 S 56.62 E 2.67 380.19S 532.29E
184.94
203.80
224.81
248.83
274.69
303.64
335.45
368.53
401.97
436.36
476.09
517.38
560.81
606.12
654.10
RECEIVED
AUG -5 i994
Oil & Gas Cons. Commission
Anchor~.j~
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
3461 3338.81 3291.86
3550 3413.09 3366.14
3645 3490.11 3443.16
3738 3563.70 3516.75
3830 3633.60 3586.65
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
32 16 S 55.10 E .88 407.90S 573.16E
34 20 S 54.82 E 2.35 435.93S 613.12E
36 54 S 55.29 E 2.71 467.54S 658.37E
39 4 S 55.98 E 2.38 499.97S 705.81E
41 30 S 59.03 E 3.41 531.77S 755.80E
FT.
VERT.
SECT.
703.45
752.25
807.43
864.88
924.01
3887 3676.51 3629.56
4012 3770.68 3723.73
4105 3840.40 3793.45
4195 3906.36 3859.41
4288 3973.66 3926.71
41 32 S 59.32 E .35 551.23S 788.43E
40 50 S 55.65 E 2.01 595.51S 857.92E
42 5 S 58.20 E 2.25 629.11S 909.55E
43 31 S 59.84 E 2.02 660.55S 961.93E
42 52 S 58.38 E 1.30 692.99S 1016.17E
961.84
1044.09
1105.60
1166.45
1229.39
4382 4043.34 3996.39
4477 4113.38 4066.43
4571 4183.00 4136.05
4664 4251.51 4204.56
4757 4320.73 4273.78
42 22 S 57.33 E .91 727.11S 1070.47E
42 16 S 58.59 E .90 760.95S 1124.54E
42 13 S 58.23 E .26 794.08S 1178.41E
42 7 S 57.49 E .55 827.10S 1230.97E
42 9 S 56.61 E .63 861.17S 1283.53E
1293.37
1357.01
1420.06
1481.98
1544.52
4851 4390.58 4343.63
4945 4459.78 4412.83
5038 4528.97 4482.02
5130 4598.08 4551.13
5222 4666.04 4619.09
42 9 S 58.43 E 1.30 895.13S 1336.88E
42 2 S 58.18 E .22 927.99S 1390.09E
41 56 S 58.82 E .48 960.53S 1443.19E
41 49 S 57.81 E .74 993.08S 1495.93E
41 59 S 58.76 E .72 1025.15S 1547.83E
1607.64
1670.00
1732.09
1793.88
1854.71
5315 4735.56 4688.61
5408 4805.10 4758.15
5503 4875.57 4828.62
5599 4946.93 4899.98
5690 5014.77 4967.82
41 42 S 58.00 E .63 1057.79S 1600.84E
41 47 S 57.55 E .34 1090.88S 1653.34E
41 59 S 57.32 E .26 1124.91S 1706.62E
42 4 S 57.06 E .20 1159.77S 1760.69E
42 4 S 56.21 E .62 1193.45S 1811.84E
1916.78
1978.70
2041.80
2106.03
2167.22
5783 5083.44 5036.49
5876 5153.03 5106.08
5970 5222.72 5175.77
6062 5291.09 5244.14
6155 5359.33 5312.38
41 58 S 55.93 E .23 1228.01S 1863.21E
41 39 S 55.06 E .71 1263.27S 1914.51E
41 46 S 56.61 E 1.11 1298.16S 1965.92E
43 0 S 52.62 E 3.19 1334.30S 2016.76E
42 55 S 52.28 E .26 1373.04S 2067.15E
2229.08
2291.31
2353.41
2415.78
2479.31
6249 5427.97 5381.02
6342 5495.75 5448.80
6435 5564.05 5517.10
6530 5633.80 5586.85
6623 5701.73 5654.78
43 1 S 52.22 E .11 1412.19S 2117.71E
42 49 S 50.85 E 1.03 1451.39S 2167.06E
42 50 S 46.22 E 3.38 1493.29S 2214.47E
42 51 S 47.28 E .76 1537.62S 2261.60E
42 39 S 48.50 E .92 1579.74S 2308.20E
2543.24
2606.20
2669.20
2733.39
2795.85
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
6716 5770.41 5723.46
6810 5839.42 5792.47
6903 5907.52 5860.57
6998 5976.92 5929.96
7091 6045.54 5998.59
COURS
INCLN
DG MN
42 50
42 52
43 1
42 15
43 1
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
S 48.66 E .22 1621.75S 2355.81E
S 49.16 E .36 1663.83S 2404.07E
S 47.47 E 1.25 1705.98S 2451.40E
S 48.17 E .95 1748.88S 2498.75E
S 47.94 E .83 1791.12S 2545.75E
2859.07
2922.84
2985.92
3049.45
3112.31
7185 6114.75 6067.80 41 52
7278 6184.01 6137.06 41 45
7372 6254.34 6207.39 41 12
7462 6322.18 6275.23 41 26
7555 6392.10 6345.15 40 57
S 50.62 E 2.28 1832.42S 2593.70E
S 49.75 E .64 1872.10S 2641.29E
S 50.76 E .92 1911.85S 2689.09E
S 50.75 E .27 1949.58S 2735.28E
S 50.39 E .59 1988.45S 2782.55E
3175.38
3237.21
3299.24
3358.79
3419.89
7650 6463.93 6416.98
7741 6532.91 6485.96
7836 6605.69 6558.74
7929 6675.98 6629.03
8022 6745.40 6698.45
40 56
40 7
40 40
41 30
41 49
S 49.06 E .92 2028.73S 2830.09E
S 54.70 E 4.14 2065.12S 2876.43E
S 55.56 E .82 2100.53S 2927.26E
S 58.45 E 2.22 2133.90S 2978.67E
S 57.65 E .66 2166.59S 3031.09E
3482.03
3540.91
3602.85
3664.05
3725.66
8114 6813.54 6766.59
8208 6884.17 6837.22
8304 6955.29 6908.34
8398 7024.66 6977.71
8493 7094.16 7047.21
41 42
41 45
41 43
43 3
43 19
S 58.37 E .54 2198.82S 3082.68E
S 57.39 E .69 2232.31S 3136.03E
S 58.32 E .65 2266.07S 3189.75E
S 56.86 E 1.76 2300.02S 3243.21E
S 55.56 E .98 2336.31S 3297.43E
3786.34
3849.18
3912.48
3975.69
4040.88
8585 7161.58 7114.63
8679 7230.84 7183.89
8769 7297.21 7250.26
8862 7365.88 7318.93
8954 7434.37 7387.42
9047 7504.01 7457.06
9141 7573.98 7527.03
9235 7644.28 7597.33
9320 7708.42 7661.47
9422 7785.52 7738.57
42 38
42 34
42 8
42 8
41 58
41 49
41 34
41 22
41 10
40 46
S 56.64 E 1.09 2371.36S 3349.59E
S 55.27 E .99 2407.01S 3402.36E
S 55.53 E .52 2441.37S 3452.16E
S 56.98 E 1.05 2475.89S 3503.83E
S 57.03 E .19 2509.54S 3555.65E
S 55.67 E .98 2544.16S 3607.66E
S 55.73 E .28 2579.29S 3659.17E
S 53.49 E 1.60 2615.26S 3709.80E
S 54.13 E .55 2648.50S 3755.23E
S 51.00 E 2.05 2689.17S 3808.38E
4103.68
4167.33
4227.81
4289.89
4351.60
4414.02
4476.34
4538.45
4594.74
4661.65
9515 7855.60 7808.65
9609 7925.87 7878.92
9702 7994.45 7947.50
9797 8065.57 8018.62
9888 8133.57 8086.62
41 10
42 3
42 3
41 46
41 49
S 52.81 E 1.35 2726.71S 3856.27E
S 49.22 E 2.71 2765.97S 3904.75E
S 49.38 E .12 2806.33S 3951.67E
S 49.95 E .50 2847.66S 4000.35E
S 51.16 E .89 2886.29S 4047.30E
4722.45
4784.76
4846.44
4910.12
4970.81
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
9981 8202.91 8155.96 41 31 S 51.59 E .45 2924.82S 4095.53E
10075 8272.97 8226.02 41 17 S 50.79 E .62 2963.54S 4143.66E
10166 8342.00 8295.05 40 49 S 51.66 E .81 3001.19S 4190.54E
10261 8414.15 8367.20 40 20 S 51.45 E '.52 3039.62S 4238.94E
10353 8484.56 8437.61 39 52 S 50.76 E .71 3076.86S 4285.10E
VERT.
SECT.
5032.48
5094.18
5154.24
5215.99
5275.22
10446 8555.54 8508.59 39 55' S 50.45 E .22 3114.52S 4330.96E
10539 8627.14 8580.19 39 13 S 51.70 E 1.14 3151.72S 4377.01E
10615 8686.31 8639.36 39 6 S 50.52 E .99 3181.98S 4414.53E
10729 8775.77 8728.82 37 59 S 49.70 E 1.08 3227.69S 4469.23E
10822 8849.60 8802.65 35 49 S 49.58 E 2.35 3263.60S 4511.48E
5334.47
5393.58
5441.73
5512.86
5568.14
10916 8926.35 8879.40 35 7 S 48.74 E .90 3299.36S 4552.86E
11010 9003.36 8956.41 34 27 S 50.58 E 1.33 3334.00S 4593.63E
11101 9079.53 9032.58 32 55 S 48.56 E 2.08 3366.91S 4632.30E
11180 9145.14 9098.19 32 55 S 48.56 E .00 3395.03S 4664.14E
5622.64
5676.00
5726.63
5768.92
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5768.92 FEET
AT SOUTH 53 DEG. 56 MIN. EAST AT MD = 11180
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 126.05 DEG.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -46.95 .00 N .00 E
1000 999.54 952.59 6.00 S 18.63 E
2000 1986.53 1939.58 105.28 S 138.29 E
3000 2936.01 2889.06 281.17 S 387.28 E
4000 3760.90 3713.95 590.74 S 850.94 E
.00
.46 .46
13.47 13.01
63.99 50.53
239.10 175.11
5000 4500.61 4453.66 947.34 S 1421.40 E
6000 5244.91 5197.96 1309.34 S 1982.46 E
7000 5978.28 5931.33 1749.71 S 2499.67 E
8000 6728.34 6681.39 2158.42 S 3018.19 E
9000 7468.28 7421.33 2526.13 S 3581.24 E
499.39 260.28
755.09 255.70
1021.72 266.63
1271.66 249.95
1531.72 260.06
10000 8216.57 8169.62 2932.34 S 4105.00 E
11000 8994.88 8947.93 3330.31 S 4589.14 E
11180 9145.14 9098.19 3395.03 S 4664.14 E
1783.43 251.71
2005.12 221.69
2034.86 29.74
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM-94 0416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
0 .00 -46.95 .00 N .00 E .00
46 46.95 .00 .00 N .00 E .00
146 146.95 100.00 .01 N .00 E .00
246 246.95 200.00 .64 N .35 E .00
346 346.95 300.00 1.34 N .74 E .01
VERTICAL
CORRECTION
.00
.00
.00
.00
446 446.95 400.00 1.68 N 1.32 E .01
546 546.95 500.00 1.64 N 2.41 E .02
646 646.95 600.00 1.20 N 4.26 E .03
747 746.95 700.00 .22 N 6.61 E .07
847 846.95 800.00 1.50 S 10.39 E .16
.O0
.01
.02
.04
.09
947 946.95 900.00 4.10 S 15.37 E .32
1047 1046.95 1000.00 8.23 S 22.26 E .65
1148 1146.95 1100.00 13.53 S 29.58 E 1.06
1248 1246.95 1200.00 21.50 S 37.83 E 1.72
1349 1346.95 1300.00 30.96 S 47.57 E 2.64
.16
.33
.41
.66
.92
1450 1446.95 1400.00 41.36 S 57.48 E 3.67
1552 1546.95 1500.00 52.09 S 70.55 E 5.10
1653 1646.95 1600.00 63.70 S 86.55 E 7.03
1755 1746.95 1700.00 75.56 S 102.36 E 8.97
1857 1846.95 1800.00 87.65 S 117.12 E 10.77
1.03
1.43
1.94
1.94
1.81
1959 1946.95 1900.00 100.26 S 132.24 E 12.69
2061 2046.95 2000.00 113.34 S 147.48 E 14.69
2163 2146.95 2100.00 127.04 S 162.79 E 16.78
2266 2246.95 2200.00 142.10 S 181.16 E 19.57
2370 2346.95 2300.00 158.01 S 204.72 E 23.55
1.92
2.00
2.09
2.79
3.98
2474 2446.95 2400.00 174.68 S 229.33 E 27.88
2580 2546.95 2500.00 193.59 S 257.22 E 33.41
2687 2646.95 2600.00 213.75 S 289.00 E 40.26
2794 2746.95 2700.00 235.24 S 320.78 E 47.37
2902 2846.95 2800.00 258.18 S 354.24 E 55.30
4.33
5.53
6.85
7.11
7.93
3012 2946.95 2900.00 284.10 S 391.53 E 65.15
3124 3046.95 3000.00 312.18 S 433.23 E 77.09
3237 3146.95 3100.00 342.04 S 476.61 E 90.11
3353 3246.95 3200.00 375.46 S 525.11 E 106.20
3471 3346.95 3300.00 410.85 S 577.38 E 124.45
9.85
11.94
13.02
16.08
18.25
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MClNTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM- 940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
3591 3446.95 3400.00
3717 3546.95 3500.00
3848 3646.95 3600.00
3981 3746.95 3700.00
4114 3846.95 3800.00
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
449.52 S 632.48 E 145.03 20.57
492.36 S 694.54 E 170.30 25.27
537.84 S 765.93 E 201.33 31.04
583.93 S 840.98 E 234.61 33.28
632.23 S 914.58 E 267.86 33.25
4251 3946.95 3900.00
4387 4046.95 4000.00
4523 4146.95 4100%00
4658 4246.95 4200.00
4792 4346.95 4300.00
680.00 S 995.04 E
728.89 S 1073.24 E
776.87 S 1150.59 E
824.88 S 1227.49 E
874.23 S 1303.35 E
304.82 36.96
340.87 36.04
376.09 35.23
411.07 34.98
445.95 34.88
4927 4446.95 4400.00
5062 4546.95 4500.00
5196 4646.95 4600.00
5330 4746.95 4700.00
5464 4846.95 4800.00
921.88 S 1380.26 E
968.90 S 1457.02 E
1016.24 S 1533.13 E
1063.16 S 1609.44 E
1111.00 S 1684.94 E
480.80 34.85
515.34 34.55
549.64 34.29
583.90 34.26
618.02 34.12
5599 4946.95 4900.00
5734 5046.95 5000.00
5868 5146.95 5100.00
6002 5246.95 5200.00
6139 5346.95 5300.00
1159.78 S 1760.70 E
1209.62 S 1835.99 E
1260.18 S 1910.08 E
1310.40 S 1983.97 E
1365.99 S 2058.04 E
652.63 34.61
687.36 34.73
721.69 34.34
755.80 34.11
792.10 36.30
6275 5446.95 5400.00
6412 5546.95 5500.00
6548 5646.95 5600.00
6684 5746.95 5700.00
6821 5846.95 5800.00
1423.04 S 2131.71 E
1482.46 S 2202.90 E
1545.90 S 2270.57 E
1607.38 S 2339.48 E
1668.40 S 2409.35 E
828.78 36.68
865.18 36.39
901.58 36.40
937.70 36.12
974.11 36.41
6957 5946.95 5900.00
7093 6046.95 6000.00
7228 6146.95 6100.00
7362 6246.95 6200.00
7495 6346.95 6300.00
1730.70 S 2478.45 E
1792.01 S 2546.72 E
1850.76 S 2615.99 E
1907.75 S 2684.08 E
1963.41 S 2752.22 E
1010.70 36.59
1046.42 35.72
1081.53 35.11
1115.27 33.74
1148.46 33.19
7627 6446.95 6400.00
7759 6546.95 6500.00
7891 6646.95 6600.00
8024 6746.95 6700.00
8158 6846.95 6800.00
2019.08 S 2818.97 E
2071.96 S 2886.09 E
2120.43 S 2956.83 E
2167.33 S 3032.25 E
2214.43 S 3108.03 E
1180.96 32.50
1212.53 31.57
1244.27 31.74
1278.02 33.75
1312.04 34.02
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING DATE OF SURVEY: 051094
PT. MCINTYRE/P2-54
500292247000 JOB NUMBER: AK-MM-940416
NORTH SLOPE KELLY BUSHING ELEV. = 46.95 FT.
COMPUTATION DATE: 5/11/94 OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8293 6946.95 6900.00 2262.16 S 3183.42 E 1346.06 34.02
8428 7046.95 7000.00 2311.40 S 3260.65 E 1381.68 35.62
8565 7146.95 7100.00 2363.95 S 3338.33 E 1418.79 37.10
8701 7246.95 7200.00 2415.45 S 3414.52 E 1454.65 35.86
8836 7346.95 7300.00 2466.55 S 3489.47 E 1489.67 35.02
8971 7446.95 7400.00 2515.69 S 3565.15 E 1524.36 34.69
9105 7546.95 7500.00 2565.79 S 3639.35 E 1558.58 34.23
9239 7646.95 7600%00 2616.66 S 3711.70 E 1592.09 33.51
9371 7746.95 7700.00 2668.35 S 3782.40 E 1625.03 32.93
9504 7846.95 7800.00 2722.14 S 3850.24 E 1657.31 32.28
9638 7946.95 7900.00 2778.40 S 3919.16 E 1691.19 33.88
9772 8046.95 8000.00 2836.95 S 3987.61 E 1725.78 34.59
9906 8146.95 8100.00 2893.80 S 4056.63 E 1759.93 34.15
10040 8246.95 8200.00 2949.09 S 4125.96 E 1793.58 33.65
10173 8346.95 8300.00 3003.84 S 4193.89 E 1826.30 32.71
10304 8446.95 8400.00 3056.98 S 4260.69 E 1857.78 31.48
10435 8546.95 8500.00 3109.95 S 4325.42 E 1888.14 30.37
10564 8646.95 8600.00 3161.75 S 4389.70 E 1917.82 29.67
10693 8746.95 8700.00 3213.13 S 4452.06 E 1946.39 28.58
10818 8846.95 8800.00 3262.36 S 4510.02 E 1972.04 25.65
10941 8946.95 8900.00 3308.92 S 4563.75 E 1994.74 22.70
11063 9046.95 9000.-'00 3352.95 S 4616.48 E 2016.07 21.33
11180 9145.14 9098.19 3395.03 S 4664.14 E 2034.86 18.78
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
Date:
Subject:
From:
To'
ARCO Alaska Inc.
Greater Point McIntyre Engineering
May 13, 1994
Transmittal Number
ARCO Alaska, Inc.
Bob Crandall
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
724
The following Greater Point McIntyre Area data are enclosed. This information is confidential
and vour cooveration in maintaining confidentiality is appreciated:
P1-03 ~FINAL LOG: Perforation Record (2 1/8" Enerjet) I 4-15-94 Schlumberger
P2-21 v/FINAL DISKETTE: MWD Sub-Surface
v/Directional Survey
P2-31 ,/'-FINAL TAPE: DLL/ZDL/CN/GR 7099 - 9806
w/LIS (LDWG) Vet
P2-54 .WFINAL DISKETTE: MWD Sub-Surface -dDirectional Survey
4-25-94 Sperry Sun
I 4-10-94 Atlas Wireline
5-10-94 Sperry Sun
Please sign _~~ __ _~.~ ...... and return
to:
Elizabeth R. Barker, ATO-415
ARCO Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
0 .00 -46.95 0 0
313 312.99 266.04 0 27
402 401.99 355.04 0 22
493 492.99 446.04 0 35
580 579.98 533.03 1 4
N .00 E .00 .00N .00E
N 28.81 E .15 1.10N .61E
N 61.27 E .28 1.56N 1.04E
S 88.83 E .35 1.69N 1.77E
S 79.01 E .58 1.53N 3.02E
.0O
-.16
-.08
.44
1.55
670 669.96 623.01 1 8
762 761.92 714.97 2 10
852 851.84 804.89 2 41
939 938.89 891.94 3 42
1031 1030.78 983.83 5 7
S 68.39 E .24 1.03N 4.69E
S 65.89 E 1.12 .01S 7.13E
S 65.32 E .58 1.59S 10.60E
S 60.45 E 1.21 3.84S 14.92E
S 58.42 E 1.55 7.47S 21.02E
3.18
5.77
9.51
14.32
21.39
1123 1122.98 1076.03 5 11
1213 1211.86 1164.91 6 54
1306 1304.43 1257.48 7 49
1400 1397.22 1350.27 8 6
1491 1486.79 1439.84 9 25
S 52.23 E .60 12.20S 27.86E
S 44.82 E 2.10 18.48S 34.84E
S 46.08 E 1.01 26.87S 43.37E
S 42.73 E .57 36.15S 52.44E
S 50.23 E 1.93 45.59S 62.48E
29.70
39.04
50.88
63.67
77.35
1588 1582.54 1535.59 11 8
1682 1674.44 1627.49 11 22
1775 1765.97 1719.02 10 39
1870 1859.82 1812.87 11 4
1965 1952.20 1905.25 11 13
S 54.07 E 1.89 56.20S 76.23E
S 53.84 E .25 66.97S 91.01E
S 51.06 E .95 77.81S 105.14E
S 50.01 E .49 89.27S 119.05E
S 50.36 E .18 100.93S 133.05E
94.70
112.99
130.80
148.79
166.96
2056 2042.04 1995.09 11 28
2151 2134.66 2087.71 11 38
2245 2226.19 2179.24 14 16
2336 2313.97 2267.02 16 21
2427 2401.69 2354.74 16 30
S 48.37 E .51 112.68S 146.73E
S 47.96 E .20 125.32S 160.85E
S 51.85 E 2.95 138.83S 177.01E
S 57.03 E 2.73 152.74S 196.59E
S 55.77 E .42 167.06S 218.14E
184.94
203.80
224.81
248.83
274.69
2523 2493.44 2446.49 18 31
2619 2583.21 2536.26 20 32
2712 2670.73 2623.78 20 55
2805 2757.76 2710.81 21 8
2897 2842.30 2795.35 23 8
S 55.63 E 2.10 183.39S 242.07E
S 58.07 E 2.29 200.78S 268.76E
S 55.79 E .95 218.86S 296.51E
S 56.21 E .29 237.57S 324.25E
S 54.90 E 2.27 257.04S 352.62E
303.64
335.45
368.53
401.97
436.36
2994 2930.71 2883.76 25 15
3087 3014.59 2967.64 27 1'0
3182 3098.42 3051.47 27 37
3276 3180.93 3133.98 29 55
3369 3260.58 3213.63 32 15
S 55.38 E 2.19 279.75S 385.23E
S 56.27 E 2.10 302.94S 419.41E
S 55.41 E .63 327.35S 455.37E
S 54.97 E 2.44 353.22S 492.57E
S 56.62 E 2.67 380.19S 532.29E
476.09
517.38
560.81
606.12
654.10
RECEIVED
Alaska Oil & ~.s"
bO_DS, i" n~ ¢,' '~'~
t!nchorage
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
3461 3338.81 3291.86
3550 3413.09 3366.14
3645 3490.11 3443.16
3738 3563.70 3516.75
3830 3633.60 3586.65
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
32 16 S 55.10 E .88 407.90S 573.16E
34 20 S 54.82 E 2.35 435.93S 613.12E
36 54 S 55.29 E 2.71 467.54S 658.37E
39 4 S 55.98 E 2.38 499.97S 705.81E
41 30 S 59.03 E 3.41 531.77S 755.80E
VERT.
SECT.
703.45
752.25
807.43
864.88
924.01
3887 3676.51 3629.56
4012 3770.68 3723.73
4105 3840.40 3793.45
4195 3906.36 3859.41
4288 3973.66 3926.71
4382 4043.34 3996.39
4477 4113.38 4066.43
4571 4183.00 4136.05
4664 4251.51 4204.56
4757 4320.73 4273.78
41 32 S 59.32 E .35 551.23S 788.43E
40 50 S 55.65 E 2.01 595.51S 857.92E
42 5 S 58.20 E 2.25 629.11S 909.55E
43 31 S 59.84 E 2.02 660.55S 961.93E
42 52 S 58.38 E 1.30 692.99S 1016.17E
42 22 S 57.33 E .91 727.11S 1070.47E
42 16 S 58.59 E .90 760.95S 1124.54E
42 13 S 58.23 E .26 794.08S 1178.41E
42 7 S 57.49 E .55 827.10S 1230.97E
42 9 S 56.61 E .63 861.17S 1283.53E
961.84
1044.09
1105.60
1166.45
1229.39
1293.37
1357.01
1420.06
1481.98
1544.52
4851 4390.58 4343.63
4945 4459.78 4412.83
5038 4528.97 4482.02
5130 4598.08 4551.13
5222 4666.04 4619.09
42 9 S 58.43 E 1.30 895.13S 1336.88E
42 2 S 58.18 E .22 927.99S 1390.09E
41 56 S 58.82 E .48 960.53S 1443.19E
41 49 S 57.81 E .74 993.08S 1495.93E
41 59 S 58.76 E .72 1025.15S 1547.83E
1607.64
1670.00
1732.09
1793.88
1854.71
5315 4735.56 4688.61
5408 4805.10 4758.15
'5503 4875.57 4828.62
5599 4946.93 4899.98
5690 5014.77 4967.82
41 42 S 58.00 E .63 1057.79S 1600.84E
41 47 S 57.55 E .34 1090.88S 1653.34E
41 59 S 57.32 E .26 1124.91S 1706.62E
42 4 S 57.06 E .20 1159.77S 1760.69E
42 4 S 56.21 E .62 1193.45S 1811.84E
1916.78
1978.70
2041.80
2106.03
2167.22
5783 5083.44 5036.49
5876 5153.03 5106.08
5970 5222.72 5175.77
6062 5291.09 5244.14
6155 5359.33 5312.38
41 58 S 55.93 E .23 1228.01S 1863.21E
41 39 S 55.06 E .71 1263.27S 1914.51E
41 46 S 56.61 E 1.11 1298.16S 1965.92E
43 0 S 52.62 E 3.19 1334.30S 2016.76E
42 55 S 52.28 E .26 1373.04S 2067.15E
2229.08
2291.31
2353.41
2415.78
2479.31
6249 5427.97 5381.02
6342 5495.75 5448.80
6435 5564.05 5517.10
6530 5633.80 5586.85
6623 5701.73 5654.78
43 1 S 52.22 E .11 1412.19S 2117.71E
42 49 S 50.85 E 1.03 1451.39S 2167.06E
42 50 S 46.22 E 3.38 1493.29S 2214.47E
42 51 S 47.28 E .76 1537.62S 2261.60E
42 39 S 48.50 E .92 1579.74S 2308.20E
2543.24
2606.20
2669.20
2733.39
2795.85
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/9
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6716 5770.41 5723.46
6810 5839.42 5792.47
6903 5907.52 5860.57
6998 5976.92 5929.96
7091 6045.54 5998.59
42 50 S 48.66 E .22 1621.75S 2355.81E
42 52 S 49.16 E .36 1663.83S 2404.07E
43 1 S 47.47 E 1.25 1705.98S 2451.40E
42 15 S 48.17 E .95 1748.88S 2498.75E
43 1 S 47.94 E .83 1791.12S 2545.75E
2859.07
2922.84
2985.92
3049.45
3112.31
7185 6114.75 6067.80
7278 6184.01 6137.06
7372 6254.34 6207.39
7462 6322.18 6275.23
7555 6392.10 6345.15
41 52 S 50.62 E 2.28 1832.42S 2593.70E
41 45 S 49.75 E .64 1872.10S 2641.29E
41 12 S 50.76 E .92 1911.85S 2689.09E
41 26 S 50.75 E .27 1949.58S 2735.28E
40 57 S 50.39 E .59 1988.45S 2782.55E
3175.38
3237.21
3299.24
3358.79
3419.89
7650 6463.93 6416.98
7741 6532.91 6485.96
7836 6605.69 6558.74
7929 6675.98 6629.03
8022 6745.40 6698.45
40 56 S 49.06 E .92 2028.73S 2830.09E
40 7 S 54.70 E 4.14 2065.12S 2876.43E
40 40 S 55.56 E .82 2100.53S 2927.26E
41 30 S 58.45 E 2.22 2133.90S 2978.67E
41 49 S 57.65 E .66 2166.59S 3031.09E
3482.03
3540.91
3602.85
3664.05
3725.66
8114 6813.54 6766.59
8208 6884.17 6837.22
8304 6955.29 6908.34
8398 7024.66 6977.71
8493 7094.16 7047.21
41 42 S 58.37 E .54 2198.82S 3082.68E
41 45 S 57.39 E .69 2232.31S 3136.03E
41 43 S 58.32 E .65 2266.07S 3189.75E
43 3 S 56.86 E 1.76 2300.02S 3243.21E
43 19 S 55.56 E .98 2336.31S 3297.43E
3786.34
3849.18
3912.48
3975.69
4040.88
8585 7161.58 7114.63
8679 7230.84 7183.89
8769 7297.21 7250.26
8862 7365.88 7318.93
8954 7434.37 7387.42
42 38 S 56.64 E 1.09 2371.36S 3349.59E
42 34 S 55.27 E .99 2407.01S 3402.36E
42 8 S 55.53 E .52 2441.37S 3452.16E
42 8 S 56.98 E 1.05 2475.89S 3503.83E
41 58 S 57.03 E .19 2509.54S 3555.65E
4103.68
4167.33
4227.81
4289.89
4351.60
9047 7504.01 7457.06
9141 7573.98 7527.03
9235 7644.28 7597.33
9320 7708.42 7661.47
9422 7785.52 7738.57
41 49 S 55.67 E .98 2544.16S 3607.66E
41 34 S 55.73 E .28 2579.29S 3659.17E
41 22 S 53.49 E 1.60 2615.26S 3709.80E
41 10 S 54.13 E .55 2648.50S 3755.23E
40 46 S 51.00 E 2.05 2689.17S 3808.38E
4414.02
4476.34
4538.45
4594.74
4661.65
9515 7855.60 7808.65
9609 7925.87 7878.92
9702 7994.45 7947.50
9797 8065.57 8018.62
9888 8133.57 8086.62
41 10 S 52.81 E 1.35 2726.71S 3856.27E
42 3 S 49.22 E 2.71 2765.97S 3904.75E
42 3 S 49.38 E .12 2806.33S 3951.67E
41 46 S 49.95 E .50 2847.66S 4000.35E
41 49 S 51.16 E .89 2886.29S 4047.30E
4722.45
4784.76
4846.44
4910.12
4970.81
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/9
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
DATE OF SURVEY: 051094
MWD SURVEY
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
9981 8202.91 8155.96 41 31 S 51.59 E .45 2924.82S 4095.53E
10075 8272.97 8226.02 41 17 S 50.79 E .62 2963.54S 4143.66E
10166 8342.00 8295.05 40 49 S 51.66 E .81 3001.19S 4190.54E
10261 8414.15 8367.20 40 20 S 51.45 E .52 3039.62S 4238.94E
10353 8484.56 8437.61 39 52 S 50.76 E .71 3076.86S 4285.10E
VERT.
SECT.
5032.48
5094.18
5154.24
5215.99
5275.22
10446 8555.54 8508.59 39 55 S 50.45 E .22 3114.52S 4330.96E
10539 8627.14 8580.19 39 13 S 51.70 E 1.14 3151.72S 4377.01E
10615 8686.31 8639.36 39 6 S 50.52 E .99 3181.98S 4414.53E
10729 8775.77 8728.82 37 59 S 49.70 E 1.08 3227.69S 4469.23E
10822 8849.60 8802'.65 35 49 S 49.58 E 2.35 3263.60S 4511.48E
5334.47
5393.58
5441.73
5512.86
5568.14
10916 8926.35 8879.40 35 7 S 48.74 E .90 3299.36S 4552.86E
11010 9003.36 8956.41 34 27 S 50.58 E 1.33 3334.00S 4593.63E
11101 9079.53 9032.58 32 55 S 48.56 E 2.08 3366.91S 4632.30E
11180 9145.14 9098.19 32 55 S 48.56 E .00 3395.03S 4664.14E
5622.64
5676.00
5726.63
5768.92
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5768.92 FEET
AT SOUTH 53 DEG. 56 MIN. EAST AT MD = 11180
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 126.05 DEG.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -46.95 .00 N .00 E
1000 999.54 952.59 6.00 S 18.63 E
2000 1986.53 1939.58 105.28 S 138.29 E
3000 2936.01 2889.06 281.17 S 387.28 E
4000 3760.90 3713.95 590.74 S 850.94 E
.00
.46 .46
13.47 13.01
63.99 50.53
239.10 175.11
5000 4500.61 4453.66 947.34 S 1421.40 E
6000 5244.91 5197.96 1309.34 S 1982.46 E
7000 5978.28 5931.33 1749.71 S 2499.67 E
8000 6728.34 6681.39 2158.42 S 3018.19 E
9000 7468.28 7421.33 2526.13 S 3581.24 E
499.39 260.28
755.09 255.70
1021.72 266.63
1271.66 249.95
1531.72 260.06
10000 8216.57 8169.62 2932.34 S 4105.00 E
11000 8994.88 8947.93 3330.31 S 4589.14 E
11180 9145.14 9098.19 3395.03 S 4664.14 E
1783.43 251.71
2005.12 221.69
2034.86 29.74
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
FT.
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
0 .00 -46.95 .00 N .00 E .00
46 46.95 .00 .00 N .00 E .00
146 146.95 100.00 .01 N .00 E .00
246 246.95 200.00 .64 N .35 E .00
346 346.95 300.00 1.34 N .74 E .01
VERTICAL
CORRECTION
.00
.00
.00
.00
446 446.95 400.00 1.68 N 1.32 E .01
546 546.95 500.00 1.64 N 2.41 E .02
646 646.95 600.00 1.20 N 4.26 E .03
747 746.95 700.00 .22 N 6.61 E .07
847 846.95 800.00 1.50 S 10.39 E .16
.00
.01
.02
.04
.09
947 946.95 900.00 4.10 S 15.37 E .32
1047 1046.95 1000.00 8.23 S 22.26 E .65
1148 1146.95 1100.00 13.53 S 29.58 E 1.06
1248 1246.95 1200.00 21.50 S 37.83 E 1.72
1349 1346.95 1300.00 30.96 S 47.57 E 2.64
.16
.33
.41
.66
.92
1450 1446.95 1400.00 41.36 S 57.48 E 3.67
1552 1546.95 1500.00 52.09 S 70.55 E 5.10
1653 1646.95 1600.00 63.70 S 86.55 E 7.03
1755 1746.95 1700.00 75.56 S 102.36 E 8.97
1857 1846.95 1800.00 87.65 S 117.12 E 10.77
1.03
1.43
1.94
1.94
1.81
1959 1946.95 1900.00 100.26 S 132.24 E ,12.69
2061 2046.95 2000.00 113.34 S 147.48 E 14.69
2163 2146.95 2100.00 127.04 S 162.79 E 16.78
2266 2246.95 2200.00 142.10 S 181.16 E 19.57
2370 2346.95 2300.00 158.01 S 204.72 E 23.55
1.92
2.00
2.09
2.79
3.98
2474 2446.95 2400.00 174.68 S 229.33 E 27.88
2580 2546.95 2500.00 193.59 S 257.22 E 33.41
2687 2646.95 2600.00 213.75 S 289.00 E 40.26
2794 2746.95 2700.00 235.24 S 320.78 E 47.37
2902 2846.95 2800.00 258.18 S 354.24 E 55.30
4.33
5.53
6.85
7.11
7.93
3012 2946.95 2900.00 284.10 S 391.53 E 65.15
3124 3046.95 3000.00 312.18 S 433.23 E 77.09
3237 3146.95 3100.00 342.04 S 476.61 E 90.11
3353 3246.95 3200.00 375.46 S 525.11 E 106.20
3471 3346.95 3300.00 410.85 S 577.38 E 124.45
9.85
11.94
13.02
16.08
18.25
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PT. MCINTYRE/P2-54
500292247000
NORTH SLOPE
COMPUTATION DATE: 5/11/94
INTERPOLATED VALUES
DATE OF SURVEY: 051094
JOB NUMBER: AK-MM-940416
KELLY BUSHING ELEV. = 46.95 FT.
OPERATOR: ARCO ALASKA INC
FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
3591 3446.95 3400.00
3717 3546.95 3500.00
3848 3646.95 3600.00
3981 3746.95 3700.00
4114 3846.95 3800.00
4251 3946.95 3900.00
4387 4046.95 4000.00
4523 4146.95 4100%00
4658 4246.95 4200.00
4792 4346.95 4300.00
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
449.52 S 632.48 E 145.03 20.57
492.36 S 694.54 E 170.30 25.27
537.84 S 765.93 E 201.33 31.04
583.93 S 840.98 E 234.61 33.28
632.23 S 914.58 E 267.86 33.25
680.00 S 995.04 E
728.89 S 1073.24 E
776.87 S 1150.59 E
824.88 S 1227.49 E
874.23 S 1303.35 E
304.82 36.96
340.87 36.04
376.09 35.23
411.07 34.98
445.95 34.88
4927 4446.95
5062 4546.95
5196 4646.95
5330 4746.95
5464 4846.95
4400
4500
4600
4700
4800
.00
.00
.00
.00
.00
921.88 S 1380.26 E
968.90 S 1457.02 E
1016.24 S 1533.13 E
1063.16 S 1609.44 E
1111.00 S 1684.94 E
480.80 34.85
515.34 34.55
549.64 34.29
583.90 34.26
618.02 34.12
5599 4946.95
5734 5046.95
5868 5146.95
6002 5246.95
6139 5346.95
4900
5000
5100
5200
5300
.00
.00
.00
.00
.00
1159.78 S 1760.70 E
1209.62 S 1835.99 E
1260.18 S 1910.08 E
1310.40 S 1983.97 E
1365.99 S 2058.04 E
652.63 34.61
687.36 34.73
721.69 34.34
755.80 34.11
792.10 36.30
6275 5446.95
6412 5546.95
6548 5646.95
6684 5746.95
6821 5846.95
5400
5500
5600
5700
5800
.00
.00
.00
.00
.00
1423.04 S 2131.71 E
1482.46 S 2202.90 E
1545.90 S 2270.57 E
1607.38 S 2339.48 E
1668.40 S 2409.35 E
828.78 36.68
865.18 36.39
901.58 36.40
937.70 36.12
974.11 36.41
6957 5946.95
7093 6046.95
7228 6146.95
7362 6246.95
7495 6346.95
7627 6446.95
7759 6546.95
7891 6646.95
8024 6746.95
8158 6846.95
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
1730.70 S 2478.45 E
1792.01 S 2546.72 E
1850.76 S 2615.99 E
1907.75 S 2684.08 E
1963.41 S 2752.22 E
2019.08 S 2818.97 E
2071.96 S 2886.09 E
2120.43 S 2956.83 E
2167.33 S 3032.25 E
2214.43 S 3108.03 E
1010.70 36.59
1046.42 35.72
1081.53 35.11
1115.27 33.74
1148.46 33.19
1180.96 32.50
1212.53 31.57
1244.27 31.74
1278.02 33.75
1312.04 34.02
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING DATE OF SURVEY: 051094
PT. MCINTYRE/P2-54
500292247000 JOB NUMBER: AK-MM-940416
NORTH SLOPE KELLY BUSHING ELEV. = 46.95 FT.
COMPUTATION DATE: 5/11/94 OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8293 6946.95 6900.00 2262.16 S 3183.42 E 1346.06 34.02
8428 7046.95 7000.00 2311.40 S 3260.65 E 1381.68 35.62
8565 7146.95 7100.00 2363.95 S 3338.33 E 1418.79 37.10
8701 7246.95 7200.00 2415.45 S 3414.52 E 1454.65 35.86
8836 7346.95 7300.00 2466.55 S 3489.47 E 1489.67 35.02
8971 7446.95 7400.00 2515.69 S 3565.15 E 1524.36 34.69
9105 7546.95 7500.00 2565.79 S 3639.35 E 1558.58 34.23
9239 7646.95 7600%00 2616.66 S 3711.70 E 1592.09 33.51
9371 7746.95 7700.00 2668.35 S 3782.40 E 1625.03 32.93
9504 7846.95 7800.00 2722.14 S 3850.24 E 1657.31 32.28
9638 7946.95 7900.00 2778.40 S 3919.16 E 1691.19 33.88
9772 8046.95 8000.00 2836.95 S 3987.61 E 1725.78 34.59
9906 8146.95 8100.00 2893.80 S 4056.63 E 1759.93 34.15
10040 8246.95 8200.00 2949.09 S 4125.96 E 1793.58 33.65
10173 8346.95 8300.00 3003.84 S 4193.89 E 1826.30 32.71
10304 8446.95 8400.00 3056.98 S 4260.69 E 1857.78 31.48
10435 8546.95 8500.00 3109.95 S 4325.42 E 1888.14 30.37
10564 8646.95 8600.00 3161.75 S 4389.70 E 1917.82 29.67
10693 8746.95 8700.00 3213.13 S 4452.06 E 1946.39 28.58
10818 8846.95 8800.00 3262.36 S 4510.02 E 1972.04 25.65
10941 8946.95 8900.00 3308.92 S 4563.75 E 1994.74 22.70
11063 9046.95 9000.'00 3352.95 S 4616.48 E 2016.07 21.33
11180 9145.14 9098.19 3395.03 S 4664.14 E 2034.86 18.78
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
EMORANDUI
TO:
THRU:
State of .-Jaska
Alaska Oil and Gas Conservation Commission
ChairnY0~
Blair Wondzell,'~~~,~'''
P. !. Supervisor t~~-'x-/
FROM: Bobby Foste~~'' SUBJECT:
Petroleum Inspector
DATE: May 2, 1994
FILE NO: A2GIEBBD.doc
BOPE Test - Doyon 14
ARCO - PBU - P2-54
Point Mc Intyre Field
Monday,. May 2., 1.9.94: ! traveled this date to ARCO's Point Mc Intyre field and
witnessed the BOPE test on Doyon rig 14.
As the attached AOGCC BOPE Test Report shows there were no failures of the
equipment tested.
The location was fairly clear of equipment, only because of a lot of construction
work, but good access to all areas of the rig and related equipmment. The rig was
being cleaned up after the rig move and all equipment seemed to be in good
working order.
Summa~: I witnessed the BOPE Test on Doyon 14, drilling ARCO's P2-54 - test
time 2.5 hours - no failures.
Attachment: A2GIEBBD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size:
Test: Initial
X Workover:
DOYON Rig No. 14 PTD #
ARCO Rep.:
P2-59 Rig Rep.:
10.75 Set @ 3,940 Location: Sec.
X Weekly Other
94-59
DATE: 5/2/94
Rig Ph.# 65g - 4510
DON WESTER
MORT HEA VIRLAND
14 T. 12N R. 14E Meridian U
,
Test
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: 'OK (Gen)
Reserve Pit ~ lA
FLOOR SAFETY VALVES: Ouan.
Well Sign OK Upper Kelly / IBOP 1
Dd. Rig OK Lower Kelly / IBOP ' '1 500t5000
Ball Type I 500t5000
Inside BOP I 500~5000
BOP STACK: Quan.
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves 3
HCR Valves 2
Kill Line Valves 3
Check Valve
Test
Pressure
500/3000
f 500~
f 500~5000
500t5000
500t5000
500~5000
500t5000
Pressure P/F
500t5000 P
MUD SYSTEM: Visual Alarm
Tdp Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Gas Detectors "/~0 TE OK
P
P
P/F Test
P CHOKE MANIFOLD: Pressure P/F
P No. Valves 14 500~5000 P
P No. Flanges 30 500~5000 P
P Manual Chokes I P
P Hydraulic Chokes P
1
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: 4 ~ 2100
3,000
1,350
P
P
minutes 26 sec.
minutes 52 sec.
YES Remote: YES
, .
Psig.
Number of Failures: 0 ,Test Time: 2.5 Hours. Number of valves tested 26 . Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
III I I I I I III I I Ir
REMARKS: GOOD TEST
Distribution:
orig-Well File
c - Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNE~S REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
W~nessed By:
BOBBY D. FOSTER
FI-021L (Rev. 7/t9) A2GIEBBD.XLS
MEMORANDb d
TO:
THRU:
FROM:
David John~,
Chairmaff~
Blair Wondzell, ~
P. I. Supervisor
Jerry Herring, ~~
Petroleum Inspector
State o, Alaska
Alaska Oil and Gas Conservation Commission
DATE: May 1, 1994
FILE NO: e2gkd3bd.doc
SUBJECT:
Diverter Test, Doyon 14
ARCO, P2-54
PTD # 94-59
Friday. April 29, 1994: ! traveled to ARCO's Pt. Mclntyre field to witness a diverter
function test on Doyon 14 drilling well P2-54. The Diverter System Inspection
Report is attached.
No problems were encountered during the function test. I found the rig and pad to
be in good condition. All equipment functioned properly.
Summa....ry: ! witnessed a successful diverter function test on Doyon 14.
Attachment: e2gkd3bd.xls
..... , STATE OF ALASKA
ALASKA ~..._ AND GAS CONSERVATION COl.
Diverter Systems Inspection Report
Operation:
Drig Contractor: DOYON DRILLING Rig No.
Operator: ARCO Oper. Rep.:
Well Name: P2-54 Rig Rep.:
Location: Sec. 14 T. 12 N. R. 14 E.
,,
~SSlON
Development
14 PTD #
Date: 4/29/94
X Exploratory:
94-59 Rig Ph. # 659-4510
DON WESTER
MORT HEAVERLAND
Merdian UMIAT
MISC. INSPECTIONS:
Location Gen.: OK Well Sign: OK
Housekeeping: OK (Gen.) Drlg. Rig: OK
=- Reserve Pit: N/A Flare Pit: N/A
DIVERTER SYSTEM INSPECTION:
Diverter Size: 20 in.
Divert VaNe(s) Full Opening: Yes
VaNe(s) Auto & Simultaneous: Yes
Vent Line(s) Size: 16 in.
Vent Line(s) Length: 40 f.
Line(s) Bifurcated: No
Line(s) Down VVind: Yes
Line(s) Anchored: Yes
Turns Targeted / Long Radius: N/A
ACCUMULATOR SYSTEM:
Systems Pressure: 3,000 psig
Pressure After Closure: 1,700 psig
200 psi Affained-Affer Closure: - - 0 ..... min: ...... 29 ..... sec:*-
Systems Pressure Attained: 2 min. 52 sec.
Nitrogen Bottles: (4;) BOTTLES
2150 (AVE.) psig
MUD SYSTEM INSPECTION: Light Alarm
Trip Tank: OK OK
Mud Pits: OK OK
Flow Monitor: OK OK
GAS DETECTORS: Light Alarm
Methane OK OK
Hydrogen Sulfide: OK OK
NORTH
Prevailing Wind Direction
Northeast to Southwest
16" Hydraulically Operated
Full Opening Knife Valve
Motor, Pits, Pipe Shed
Complex
20" Annular Preventer
16" Vent Line !
Rig & Sub Base
- ,
Non Compliance Items None Repair Items W'rthir
Remarks:
N/A
Day (s) And contact the Inspector @ 659-3607
Distribution
orig. - Well File
c - Oper/Rep
c - Database
c - Trip Rpt File
c- Inspector
AOGCC REP.:
E2GKD3BD.XLS
ALASKA OIL AND GAS
CONSERVATION COMMISSION
.WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
April 13, 1994
Adrian Cl'ark
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Point McIntyre P2-54
ARCO Alaska, Inc.
Permit No: 94-59
Sur. Loc. 550'SNL, 1233'EWL, Sec. 14, T12N, R14E, UM
Btmhole Loc. 1228'NSL, 875'EWL, Sec. 13, T12N, R14E, UM
Dear Mr. Clark:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill dOes not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE
test performed before drilling below the surface casing shoe must be
given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field
inspector on the North Slope pager at 659-3607.
David W.
Chairman
BY ORDER OF THE
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.OO5
ila. Type of work Drill [] RedrillFlllb. Type of well. Exploratoryr-] Stratigraphic Test [] Development Oil[]
Re-Entry [] Deepenr"l! Service [] Development Gas [] Single Zone [] Multiple Zone []
:2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE = 46.05 feet Point Mclntyre
3. Address 6. Property Designation
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 34624
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
550' SNL, 1233' EW/_, SEC. 14, T12N, R14E Point Mc/ntyre
At top of productive interval 8. Well number Number
1462' NS/_, 546' EWL, SEC. 13, T12N, R14E P2-54 U-630610
At total depth 9. Approximate spud date Amount
1228'NSL, 875' EWL, SEC. 13, T12N, R14E 5/2/94 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa,dWD)
line
prop L 365548-4050' feet P2-55-13'@ 650'MD feet 2560 11416'MD/9227' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 2o ,,,Ac 25.035 (e)(2))
Kickoff depth 3oo feet Maximum hole angle,m¢~ o Ua×~mum surf,ce 3330 psig At total depth (TVD) 8~0~)'/4~0 psi~
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 260 sx Arcticset
13-1/2" 10-3/4" 45.5# J-55 BTC 3872' 46' 46' 3918' 3700' 1136sxCSIIl/354sx"G"/250sxCSII
9- 7/8" 7-5/8" 29. 7# NT95HS NS CC ~ 104 74' 44' 44' 10518' 8565'
9-7/8" 7-5/8" 29.7# 13CR80 NSCC 750' 10518' 8565' 11416' 9227' 590 SX Class "G"
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor
RECEIVED
Intermediate
'Production A~3[-~ 3 ~1 'i99/~
Liner
Perforation depth: measured /,:¥,oi~a 0:,l & Gas Cons. Cornmissio~
true vertical Anchorage
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid progra~ Tirrje vs depth plot F"I.-, R~fraction analysis l-! Seabed report[] 20 AAC 25.050 requirements~
21. I hereby '¢e~/~h~tlthei foregoind i~ tru¢/sC~d J:brrect to the best of my knowledge ~
Title Drillin9 Engineer Supervisor' J ' '~'/ ' ('~
Commission Use Only
Permit Number IAPI number IApproval date ISee letter
- Ifor other requirements
Conditions'of approval Samples required [] Yes [] No Mud log required []Yes [] No
Hydrogen sulfide measures [] Yes 1~ No Directional survey required [] Yes [] No
Required working pressure for BOPE [] 2M; 1-13M; I~5M; r"'I10M; []15M;
Other:
Original Signed By by order of
_Approved by David W. Johnston Commissioner tne commission Date,/,/~
Form 10-401 Rev. 12-1-85
Submit in iflicate
Well
Name'.
P2-54/L7
Well Plan Summary
Type of Well (producer or
injector):
PRODUCER
Surface 550' FNL, 1233' FWL, SEC 14, T12N, R14E
Location:
Target Location: 1462' FSL, 546' FWL, SEC 13, T12N, R14E
Bottom Hole 1228' FSL, 875' FWL, SEC 13, T12N, R14E
Location:
AFE 2C0066
Number:
Rig: DOYON RIG #14
Estimated Start
Date:
02MAY94
Operating days to
complete:
IMD: 1 11416' I ]TVD: ] 9227' I
17
II~E: 146'05' I
Well Design (conventional,
slimhole, etc.):
SLIMHOLE LONGSTRING
Formation Markers:
Formation TopsMD TVD (KB) Comments
T-8 3947 3721
WEST SAK 8207 6861
K-12 8396 7001
K-10 10316 8416
K-5 10479 8536
HRZ 10750 8736
KALUBIK 10797 8771
KUPARUK 10818 8786
MILUVEACH 11182 9054
~ID 11416 9227
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 1
Anchorage
Casin[/Tubing Program:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD
30" 20" 91.5g H-40 WLD 80' GL 110/110
13-1/2" 10-3/4" 45.5~ J-55 BTC 3872' 46' 3918/3700
9-7/8" 7-5/8" 29.7# NT- N9~ 750' 10518' 11416'/9227
13CR80 /8565' ,
9-7/8" 7-5/8" 29.7# NT-95HS N93C 10474' 44' 10518'
/8565'
'I'BG 4-1/2" 12.6# 13CR-80 N,.~T 10526' 42' 10568'
Logging Program:
IOpen Hole Logs:
SURFACE
PRODUCTION
Cased Hole Logs:
GR/Resistivity/Neutron/Density (From top of K-10 to TD)
Gyro (After Rig Release)
Mud Program-.
ISpecial design I Fresh water dispersed mud to top of Kuparuk (3% KCL I
considerations I through Kuparuk)
I
Surface Mud Properties: I SPUD
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.7 300 40-60 30-60 60-80 9-10 15-25
Intermediate Mud Properties: I Fresh / lightly dispersed
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.5 50 20-40 15-20 20-30 9-10 10-20
Production Mud Properties: I 3% KCL with HTHP < 15
Density PV Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.5 8-15 15-30 5-15 10-20 9-10 5-8 APl
10.0 15-30 15-30 8-12 <25 9-9.5 5-8 APl
HTHP < 15
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 2
RECEIVED
Gas Cons. Commission
Anchorage
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular
preventer will be install~ and is capable of handling maximum potential surface
pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
I KOP: ] 300' M~
Maximum Hole
Angle:
Close Approach
Well:
42.51°
P2-55 (DRILLED/CASED. NO
COMPLETION OR PERFS)
The above listed wells will be secured during the close approach.
Disposal:
Cuttings Handling: CC2A
Fluid Handling: Haul to CC2A
Annular Injection: ANNULAR INJECTION IS NOT ALLOWED AT PT MC INTYRE AT THIS TIME.
AREA WELL PREV VOL PERMITTED PERMITTED DATES
INJECTED VOL
(aBES) (aBES)
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 4
Anchorage
P2-54/L7: .J-3/4" SURFACE CASING CEMENT PR,..,,.~RAM-BJ SERVICES
CIRC. TEMP 50OF
LEAD CEMENT TYPE: COLD SET III
WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx
APPROX #SACKS: 1166 sks (2239 cuff)
TAIL CEMENT TYPE: CLASS G
MIX WATER: 10.53 gps (50-65°F)Fresh
THICKENING TIME: 4:30 hrs
MIX WATER' 4.95 gps (50-65°F)Fresh
THICKENING TIME: 4 hrs
MIX WATER: 3.89 gps
ADDITIVES: 2 % A-7 Calcium Chloride, .5 GHS FP-12L surfactant
WEIGHT: 15.8 ppg YIELD:1.15 ft3/sx
APPROX #SACKS: 354sx (407 cuft)
TOP JOB CEMENT TYPE: Cold Set II
WEIGHT: 14.5 ppg YIELD:0.96 ft3/sx
APPROX #SACKS: 250 (235 cuff)
SPACER: 50 bbls fresh water ahead of lead slurry.
CEMENT VOLUME:
1. Lead slurry from 500' above shoe to surface w/80% excess.
2. Tail slurry volume 354 sx (500' + 100% excess + shoe volume).
3. Top job volume 250 sx.
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 5
RECEIVED
>,., ,,, i994
.,:,.,:,,:,;:a o;! & Oas Cons. Commission
Anchorage
P2-b-,,L7: 7-5/8" CASING CEMENT PROGRA...-BJ SERVICES
CIRC. TEMP 135° F
SPACERS:
Pump 20 bbls 2% KCL water, followed by 70 bbls MCS-4 with 2% KCL at 1 ppg over
mudweight. Follow the spacers with cement.
CEMENT TYPE: Class "G" + 2% KCL
ADDITIVES:
0.85% BA-10, 0.65% FL-33 fluid loss additive, 0.2% CD-32 dispersant, 0.3% A-2,
0.3% R-1 retarder, .5 ghs FP-12L surfactant
WEIGHT:15.7 ppg YIELD: 1.1 9 ft3/sx
MIX WATER: 5.12 gps fresh water
APPROX #SACKS: 590 sx (702 CU FT)
THICKENING TIME: 4 hrs
OTHER CONSIDERATIONS:
Perform lab tests on mixed cemenVspacedmud program and ensure
compatibility prior to pumping job. Ensure thickening times are adequate
relative to pumping job requirement. Displace at maximum rate (12-
15 bpm).
CEMENT VOLUME:
Order the cement volume based on the following'
.
500' above the top of SISS (Stump Island Sandstone), or 1000' above the top of Kuparuk if
not present.
Calculate gauge hole plus 90% excess (excess factor = 1.9)
Add 32 cuff for the 80' of 7-5/8" shoe joint.
Add 30 cuff for cement left in the batch mixer and lines.
SISS is
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 6
?,ECEIVED
/'..'~-:i'--~ "1, 'i ~r~c. ~,,, ,;.
Oas Oozes. Commission
Anchorage
.
.
.
.
.
.
.
.
10.
P2-54/L7 Operations Summary
MIRU drilling rig.
Spud well and drill 13-1/2" hole. Kick off at 300' MD and build hole angle to 42.51°, 125.41 o
azimuth. Continue drilling to 3918' md / 3700' tvd.
Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test
same to 5000 psi.
Pick up 9-7/8" BHA and drill 10' of new hole and perform leakoff test. Drill 9-7/8" hole to TD of
11416' md/9227' tvd. (PU LWD - real time gamma ray/resistivity and recorded CDN - logs before
reach top of Kuparuk.) Short trip then POOH and LDDP.
RIH with 7-5/8" 13CR x L-80 casing and cement same, displacing with 8.6 ppg seawater. Test casing
to 4000 psi for 30 minutes.
RIH with 4-1/2", 13CR-80 completion assembly.
ND BOPE and NU tree assembly. Test tree assembly to 5000 psi.
Pump tubing full of diesel plus enough more to freeze protect the annulus to 2200' tvd.
Set packer. Test tubing. Test annulus. Notify STATE for witnessing of annulus test.
Secure well. Release rig.
POST RIG WORK
1. Run gyro.
PT MC INTYRE
P2-54/L7 DRLG PERMIT
April 6, 1994 4:53 PM
Page 7
RECEIVED
r_";,xs Cons. Commission
Anchorage
~/I 5/94 gOg ~m
TV3 REF: WELLHE'~D
VER71C~2 2EETIF~N REF; '~'ELLHEAD
TiE LN
33o
". 593
2182
· 5,141
t
i
!
1
I
~ 37~ ~ ~ ~
~ ":-"lq,,
-5O0 3- 533 :'::CO :533
VF__R%C~ SEC~.-!ON PL&gE: 125.41°
'~_'2~..iZ.P,~NITA.'_ 'v]E'W (TRLE~ NC~,TH)
SD'CE 5O3 ¢~. / DIViSIF!N
,v~
SJRVEY REF: ~'EI~LHEAD
..J
, ~4%o,.., ,-- ~?-~"
% '<",'d~ 4? .--,? , ~-
~ ,~ ,
,%
~D irc '~z,. TVD N/S E/-'
:~ iN - 0.CO° SD? 3 3N C E
~ / START ~ O.~ ~.~'~ -~u C N C
?~T C~ ~JILD 7CO 2.~ 1~.41° 733 4 S 6
D~ ~ 3Jl~ '-~ '-',.~ '.~.4:° '.~93 63 S ~
ST~T ~ ~iLD ~ 11.~ 1~.41o ~1~ !~ S ~
ST~T ~ ~ ~7.~ ~4~o ~570 ~ S 85J
~ ~ CURVE 3976 4~.57 I~ 4~o 3~ 549 S 773
T-8 ~7 4E.5:~ :~.4~o 37E~ 577 S 9:~
K-t5 ~ %73 4~.5:~ t~4:o 5~4~ ~33~ S 2873
~EST ~ SA~ 8~7 4~.5:~ :~.47 6~ E~45 S 3t~
' l? 4P~'o ~.4~o
K-~O :03~G 42.5~o 2~.4~o 8416 ~7~ S 4~
~ ~O~D 42.5:~ ~.4~o 8735 3241 S 4~
T~-~% / I~18 42.5!° 1~.41° 8785 3267 S 45~
~U~ II!B~ ~2.5'.° I~.41o ~4 3410 S ~7~
59c/'878 I
RECEIVED
APR 1'i i994
I CASiN~ ~q' DATA
, I0 3/z ;n 3918 "2.5:° !25.47 37'33 56,5 S 79-3
.=~.~:zP. Ds~_"zzI ~--L
I:v 1
, HD 11415.80
I V2 6043.03 .
N/S 2501.39 S I
[ E/k~ 4925.29 E
Oil & Gas Cons. Commiss
Anchorage
C~ eo-ted By
Checked By
Date
_/
J
:Z:;' ~ - '-,, /_,!. ,, i.~ 4
i : ._; , Wp_; 5
~4D 0- ':4'6. f':. [n';er'vm, ,_,v~ 95.
353
183°
3/~ 5/94 9 86 om
~LL!3URT[3N
I_.212°
~ST ~,~q'S
j ~7 wsl ~.61 343.9~ O.~ ~.~ 3~.~
~5.67 349.~ O.~ O.~ 37~.~
~-21 ~1 ~.~ E.E4 0.~ 0.~ ~i 17.~
i ~-~ ~.~ ~.34 O.~ 0.~ 4E~.70
~.t6 5.61 O.~ 0.~ I ~.~O
~ ~5 ~.!6 5.6! 0.~ 0,~ ~77~.~0
~-~c 4~9.~ 2E.~ 0.~ O.~ 7~.70
~ ~-~ ~'d ~.73
~ ~.~ 22.37 ~.~ ~.~ 8~. lO
~-31 ~ 374.~ ~.~
[ -~ 'd~ 3~4,~ ~.~ 0.~ 0.~ ~ ~778.~0
~-~4 ~ ~.~ EE.~ 0.~ 0.~ ~.~
~ MdD t49.37 ~.45 I~.~ I~.~ 49.~
~ 117:~ 19.67 ~.~ 7~.~ 17,10
74.91
I ~-~ ~9~ ~.~ 653.~ ~9,~ 240
i ~-57~!0 i~'7~ ~5,37 ~.~ ~.74 6.~0
1 ~ a~.37 ~.~ ~.~ t
~ ~_~ ~.~7 ~7~.~ om o.w ~7~,~
~.~4
RECEIVED
APR 11 1994
u:l & Gas Cons. Commission
Anchorage
C'~!TICAL PD!NT DATA
,~.O ins Az;. TV2 N/S
RE ~ o 0900 C.,~ " O N 0 E
~ / ST~T ~ 0.~ 0,~
ST~T ~ ~ 7~ ~.~ 1~.41° 7~ 4 S 6 E
~D ~ ~ ~ 1~.~ :~.4!° I~3 63 S ~ E
ST~T ~ BJ!LD ;~ tt.~ 1~.47 ElBE ~ S I~ E
~ ~ ~ 3876 42.51° t~.4t° 3~8 549 S 773 E
7-8 3~47 4a.5:° ~.4]o 37~ 577 S 8~ E
K-t5 ~ ~73 4~.57 ~.4~~ 5~42 t33: S ~873 E
~ST ~ SA~ ~7 4~.5:° ]~.47 6~ ~45 S 3J~ E
K-~ 8~7 4E.5]° ;~.47 7~ ~319 S ~ E
K-~O ]~5 48.5:° ]~.4t° 84~6 ~7t S z~ E
K-5 ~0479 4E.57 ~.4~
K~ I07~ 48.51° 1~.4~° 8771 ~ S 4~ E
T=-~ / t~8 4E,57 ~,4~° 87~ ~7 S 4~ E
~~ ~l~BE 4E.57 ~.4~° ~4 34~0 S 47~ E
[Tc~.qe'~ N~-,e TV~ NS EW C¢;o X Cfid Y
To.,"De'~ 8786 3267 S 4,5,9~ E ¢:436~F58 59::24878
TVD
ND 11415.89
VS 6O4.3.03
N/S 350!.3~
E/~ 4G25.L:~
E~i:e Plo't-:ed
Cr, ea'ted By
Checked By
Ao?oved By
WELL PERMIT CHECKLIST
COMPANY ./~.W
INIT CLASS
~--.q~ PROGRAM: axp [] der [] redrll [] serv []
uN~T# t1~0 ON,OFF S~O~ ~
ADMINISTRATION
APPR D
ENGINEERING
APPR DATE
GEOLOGY
APPR D
1. Permit fee attached ...................
2. Lease number appropriate ..... ...........
3. Unique well name and number ..............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6.
Well located proper distance from other wells .....
' 7. Sufficient acreage available in drilling unit .....
8. If deviated, is wellbore plat included ........
· 9. Operator only affected party .............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order ....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15-day wait .......
14. Conductor string provided ............... ~ N
15. Surface casing protects all known USDWs ........ ~ N
16. CMT vol adequate to circulate on conductor & surf csg. '9 N
17. CMT vol adequate to tie-in long string to surf csg . .~~
18. CMT will cover all known productive horizons ...... ~ N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............. Y~ N
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed .......... ~ N
23. If diverter required, is it adequate .......... ~ N
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate .....................
26. BOPE press rating adequate; test to ~ psig.~ N t.-
27. Choke manifold complies w/API RP-53 (May 84) ....... ~7~/~
28. Work will occur without operation shutdown ....... ~ N
29. Is presence of H2S gas probable ............. Y
30.
Permit
can be issued w/o hydrogen sulfide measures ....
31. Data presented on potential overpressure zones .....
32. Seismic analysis 9f shallow gas zones ......... /Y N
33. Seabed condition survey (if off-shore) ....... / . Y N
34. Contact name/phone for weekly progress reports . ./ . . Y N
[exploratory only]
GEOLOGY:
ENGINEERING: COMMISSION:
BEW D~
Comments/Instructions:
HOW~o - A:~FORMS~cheldist rev 03/94
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER
.
******************************
.
* ....... SCHLUMBERGER .......
.
******************************
RECEIVEO
JUL 1 1 1997
Oil & Gas ~on~. Gon~on
An~orage
COMPANY NAME : ARCO ALASKA, INC.
WELL NAME : 2A-18
FIELD NAME : KUPARUK RIVER UNIT
BOROUGH · NORTH SLOPE
STATE : ALASKA
API NUMBER : 50-103-20220-00
REFERENCE NO : 97284
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/07/ 1
ORIGIN : FLIC
REEL NAME : 97284
CONTINUATION # :
PREVIOUS REEL :
COMPiF2VT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/07/ 1
ORIGIN : FLIC
TAPE NAME : 97284
CONTINUATION # : 1
PREVIOUS TAPE :
CONkS_irT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
BIT RUN 1
97284
SECTION:
TOWNSHIP:
RANGE:
FNL :
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
2A-18
501032022000
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
1 -JUL-97
BIT RUN 2 BIT RUN 3
13
liN
8E
736
227
135.00
135.00
94.30
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 16.000 121.0
9.625 3004.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
3RD STRING
PRODUCTION STRING
THIS IS A DEPTH CORRECTED MWD GR. THE GAk~4A RAY (GR)
AND RATE OF PENETRATION (ROP) WERE INTERPOLATED TO FILL
DATA GAPS.
NOTE: THE MWD GR AND ROP DATA WAS ACQUIRED ON 15-MAY-95.
THE BASE GA~VIA RAY (GRCH. CET) WAS ACQUIRED ON
15-0CT-95 AND WAS DIGITIZED FROM FIELD PRINTS
ON 27-JUN-97.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE ' FLIC
VERSION ' O01CO1
DATE · 97/07/ 1
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUMBER: 1
EDITED MERGEDMWD
Depth shifted, clipped, & interpolated curves; 1 bit run.
DEPTH INCREMENT: O. 5000
FILE SUN~4ARY
LDWG TOOL CODE
SLWD
$
BASELINE CURVE FOR SHIFTS: GRCH
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
6190.0 2994.0
BASELINE DEPTH
88888.0
6121.5
6106.0
6103.0
6100.0
6094.0
6091.0
6089.0
6086.0
6084.0
6083.0
6079.5
6066.5
6063.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
MWD
88884.0
6117.5
6102.0
6099.5
6096.0
6086.0
6084.5
6082.0
6079.0
6077.0
6076.0
6072.5
6059.5
6056.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
6060.0
6056.0
6054.0
6051.0
6047.5
6045.0
6043.0
6041.0
6033.0
6024.0
6022.0
6015.0
6001.0
5998.0
5995.5
5991.0
5979.0
5974.0
5970.5
5960.0
5955.5
5951.0
5947.0
5937.0
593 O. 0
5902.0
5891.0
5889.0
5887.0
5869.0
5849.0
5839.0
5822.0
100.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
SLWD
$
RE~KS:
6053.0
6049 0
6047 0
6042 5
6040 5
6038 0
6036 5
6034.0
6026.0
6017.0
6015.0
6006.5
5993.0
5990.5
5987.5
5981.5
5971.0
5967.0
5962.5
5950.5
5945.5
5943.0
5940.5
5929.5
5923 5
5894 5
5884 0
5882 0
5880 5
5863 0
5841.5
5831.0
5815.0
93.0
BIT RUN NO. MERGE TOP MERGE BASE
1 2994.0 6190.0
THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRIN.MWD (FROM
15-MAY-95) TO GRCH. CET (FROM 15-0CT-95). THE RATE OF
PENETRATION (ROP) WAS CARRIED WITH THE GRIN SHIFT.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 20
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 51
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NA~E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
GRRWMWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000
GRIN MWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CET GAPI O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 6658.000 GRRW. MWD -999.250 GRIN. MWD -999.250 ROP.MWD
GRCH. CET 46.201
DEPT. 2994.000 GRRW. MWD 51.400 GRIN. MWD 51.400 ROP.MWD
GRCH. CET -999.250
-999.250
223.400
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/07/ 1
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE . 97/07/ 1
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE StC~ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
6194.0 3001.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
BOREHOLE AND CASING DATA
15-MAY-95
MEMORY
6194.0
3001.0
6194.0
TOOL NUMBER
...........
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
8.500
121.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
1 snd
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: GAPS IN MWD GR DATA ARE CAUSED BY HIGH ROP.
THIS IS THE RAW MWD GR AND ROPE DATA FOR BIT
RUN #1.
$
LIS FO.~AT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 16
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 64
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
TYPE REPR CODE VALUE
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
GRRW RW1 AAPI O0 000 O0 0 2 1 1 4 68 0000000000
GRIN RW1 AAPI O0 000 O0 0 2 1 1 4 68 0000000000
ROPE RW1 FPHR O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 6194. 000 GRRW. RW1 -999. 250 GRIN. RW1 -999. 250 ROPE. RW1
DEPT. 3001. 000 GRRW. RW1 51 . 400 GRIN. RW1 51 . 400 ROPE.RW1
-999.250
223.400
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/07/ 1
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/07/ 1
ORIGIN : FLIC
TAPE NAM~ : 97284
CONTINUATION # : 1
PREVIOUS TAPE :
COMI4ENT ' ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1-JUL-1997 15:07
PAGE:
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/07/ 1
ORIGIN : FLIC
REEL NAME · 97284
CONTINUATION # :
PREVIOUS REEL :
COM~iENT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00
· ALASKA COMPUTZNG CENTER *
· SCHLUMBERGER *
COMPANY NAME : ARCO ALASKA, ZNC.
WELL NAME : P2-54
FZELD NAME : POZNT MCZNTYRE
BOROUGH : NORTH SLOPE
STATE : ALASKA
APZ NUMBER : 50-029-22470-00
REFERENCE NO : 94190
LTS Tape Verification List, lng
Schlumberger Alaska Comput, ing Cent, er
6-JUN-1994 13'52
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 94/06/ 6
ORIGIN : FLIC
REEL NAME : 94190
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-54,50-029-22470-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 94/06/ 6
ORIGIN : FLZC
TAPE NAME : 94190
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, INC.,POINT MCINTYRE, 2P-54,$0-029-22470-00
TAPE HEADER
POINT MCINTYRE
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
P2-54
500292247000
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
3-JUN-94
BIT RUN 1 BIT RUN 2 BIT RUN 3
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
94190
ST. AMOUR
1ST STRING
2ND STRING
14
12N
14E
55O
1233
46.95
45.95
11.20
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 10.750 3940.0
PAGE'
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3RD STRING
PRODUCTION STRING
REMARKS:
6-JUN-1994 13:52
FIELD REMARKS
DEN TO BIT: 106.90' NEUT TO BIT: 113.84'
DRLLING INTERVAL: 10706' TD 11181'
WASHDOWN INTERVAL: 10268' TO 10705'
--
GR PROVIDED BY SPERRY-SUN LOGGING TOOL
--
MAXIMUM DEV.: 43.33 DEG ~ 8493.5 FT
TIME WELL TO: 06:0S lO-MAY-94
LIS FORMAT DATA
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : 001C01
DATE : 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
PAGE:
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CDN 10244.0 11181.0
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA [MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
MERGED DATA SOURCE
LDWG TOOL CODE
BIT RUN NO. MERGE TOP
MERGE BASE
CDN
CDN
$
1 10244.0 10706.0
2 10705,0 11181.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
6-JUN-1994 13'52
REMARKS: NO DEPTH SHIFTING WAS DONE BECAUSE, AS PER JAMES DEAL, NO
CASED HOLE LOGS WERE PLANNED TO TIE INTO. MERGED DATA WAS
AN INITIAL UPHOLE MAD PASS AND A DRILLING PASS.
OR PROVIDED BY SPERRY-SUN LOGGING TOOL.
LAST DATA FOR CON TOOL AT 11074', GAMMA RAY RUN DEEPER.
LIS FORMAT DATA
PAGE'
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
I 66 0
2 66 0
3 73 40
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 25
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE' APZ APZ APZ APZ FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 599443 O0 000 O0 O' 1 1 1 4 68 0000000000
RHOB MWD G/C3 5994.4,3 O0 000 O0 0 1 1 1 4 68 0000000000
DRHO MWD G/C3 599443 O0 000 O0 0 I I 1 4 68 0000000000
PEF MWD BN/E 599443 O0 000 O0 0 1 1 I 4 68 0000000000
CAEN MWD ZN 599443 O0 000 O0 0 I I I 4 68 0000000000
NPHI MWD PU-S 599443 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR 599443 O0 000 O0 0 1 I I 4 68 0000000000
GR MWD GAPI 599443 O0 000 O0 0 1 1 I 4 68 0000000000
NCNT MWD CPS 599443 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT MWD CPS 599443 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verifica%ion Lis%lng
Schlumberger Alaska Compu%ing Cen%er
** DATA
DEPT. 11181.000 RHOB.MWD
CALN.MWD -999.250 NPHI.MWD
NCNT.MWD -999.250 FCNT.MWD
DEPT. 11000.000 RHOB.MWD
CALN.MWD 9.131 NPHI.MWD
NCNT.MWD 256.125 FCNT.MWD
DEPT. 10244.000 RHOB.MWD
CALN.MWD -999.250 NPHI.MWD
NCNT.MWD -999.250 FCNT.MWD
6-JUN-1994 13:52
-999.250 DRHO.MWD
-999.250 ROP.MWD
-999.250
2.713 DRHO.MWD
24.100 ROP.MWD
6.333
-999.250 DRHO.MWD
-999.250 ROP.MWD
-999.250
-999.250
20.471
-0.029
46.896
-999.250
-999.250
PEF.MWD
GR.MWD
PEF.MWD
GR.MWD
PEF.MWD
GR.MWD
PAGE:
-999.250
-999.250
3.892
35.023
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE - 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE · 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 2
RAW MAD
Curves and log header da%a for each bi% run in separa%e
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CDN
$
LOG HEADER DATA
10244.0 10734.0
files.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
6-JUN-1994 13:52
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BO]TOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
11-MAY-94
FAST 2.3D
MEMORY
11181.0
10268.0
11181.0
43 . 3
TOOL NUMBER
CDN
$
NEUTRON/POROSITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
NDSO55
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
9.875
3940.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
9.80
155.0
2. 420
I . 960
76.0
69.0
REMARKS:
SANDSTONE
2.65
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
I. 688
************ RUN I *************
MAD PASS 10244~ - 10734~
CDN/GR ONLY
GR PROVIDED BY SPERRY-SUN LOGGING TOOL
SPERRY-SUN GAMMA RAY RECORDED WITH INDEPENDENT
DEPTH SYSTEM
BIT TO DEN: 106.90; BIT TO NEUT: 113.84
MAXIMUM DEV: 43.3 DEG AT 8493.5 FT
TD WELL 06:05 lO-MAY-94
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
LIS FORMAT DATA
6-JUN-1994 13'52
PAOE'
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
i 66 0
2 66 0
3 73 48
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 21
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 599443 O0 000 O0 0 2 1 1 4 68 0000000000
RHOB LW1 G/C3 599443 O0 000 O0 0 2 1 1 4 68 0000000000
DPHI bWl PU 599443 O0 000 O0 0 2 1 1 4 68 0000000000
DRHO LWl G/C3 599443 '00 000 O0 0 2 I I 4 58 0000000000
PEF LW1 BN/E 599443 O0 000 O0 0 2 1 I 4 68 0000000000
DCAL LW1 IN 599443 O0 000' O0 0 2 1 1 4 68 0000000000
TNPH bWl PU 599443 O0 000 O0 0 ' 2 1 1 4 68 0000000000
ROPE LW1 F/HR 59944-3 O0 000 O0 0 2 1 1 4. 68 0000000000
GR bWl GAPI 599443 O0 000 O0 0 2 1 1 4 68 0000000000
HENA LW1 CPS 599443 O0 000 O0 0 2 1 1 4 68 0000000000
HEFA LW1 CPS 599443 O0 000 O0 0 2 1 1 4 68 0000000000
TABD LW1 HR 599443 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
DEPT. 10734.000 RHOB.LW1
PEF.LW1 -999.250 DCAL.LW1
GR.LW1 -999.250 HENA.LW1
6-JUN-1994 13'52
-999.250 DPHZ.LWl
-999.250 TNPH.LW1
-999.250 HEFA.LW1
-999.250 DRHO.LWl
-999.250 ROPE.LWl
-999.250 TABD.LW1
PAGE'
-999.250 71.145
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : 001C01
DATE : 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 3
RAW MAD
Curves and log header data for each bit run in separate
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CDN 10593.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
11181.0
11-MAY-94
FAST 2.3D
MEMORY
11181.0
10268.0
11181.0
files.
LIS Tape Verification Listing
Schlumberger Alaska Compu%ing Center
6-JUN-1994 13'52
MINIMUM ANGLE'
MAXIMUM ANGLE'
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
43.3
TOOL NUMBER
CDN
$
NEUTRON/POROSITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)'
DRILLERS CASING DEPTH (FT)'
NOS055
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
9.875
3940.0
NEUTRON TOOL
MATRIX'
MATRIX DENSITY'
HOLE CORRECTION (IN)'
9.80
155.0
2. 420
1. 960
76.0
69.0
REMARKS ·
SANDSTONE
2.65
TOOL STANDOFF (IN)'
EWR FREQUENCY (HZ)'
1. 688
************ RUN 2 *************
DRILLED INTERVAL 10706' - 11181~
WASHDOWN INTERVAL 10268' TO 10706'
CDN/GR RUN ONLY
GR PROVIDED BY SPERRY-SUN LOGGING TOOL
SPERRY-SUN GAMMA RAY RECORDED WITH INDEPENDENT
DEPTH SYSTEM.
BlT TO DEN: 106.90; BlT TO NEUT: 113.84,
MAXIMUM DEV: 43.3 DEG AT 84,93.5 FT
TD WELL 06:05 lO-MAY-94
$
LIS FORMAT DATA
PAGE'
LIS Tape Verifica%ion Lis%lng
Schlumberger Alaska Compu%ing Cen%er
6-JUN-1994 13:52
** DATA FORMAT SPECIFICATION RECORD
SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 48
4 66 1
5 66
6 73
7 65
8 68 o.s
9 65 FT
11 66 21
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
PAGE:
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 599443 O0 000 O0 0 3 1 1 4 68 0000000000
RHOB LW2 G/C3 599443 O0 000 O0 0 3 1 1 4 68 0000000000
DPHI LW2 PU 599443 O0 000 O0 0 3 1 1 4 68 0000000000
DRHO LW2 G/C3 599443 O0 000 O0 0 3 1 I 4 68 0000000000
PEF LW2 BN/E 599443 O0 ,, 000 O0 0 3 1 1 4 68 0000000000
DCAL LW2 IN 599443 O0 000 O0 0 3 1 I 4 68 0000000000
TNPH LW2 PU 599443 O0 000 O0 0 3 1 1 4 68 0000000000
ROPE LW2 F/HR 599443 O0 000 O0 0 3 1 1 4 68 0000000000
GR LW2 GAPZ 599443 O0 000 O0 0 3 I I 4 68 0000000000
HENA LW2 CPS 599443 '00 000 O0 0 3 I I 4 68 0000000000
HEFA LW2 CPS 599443 O0 000 O0 0 3 i I 4 68 0000000000
TABD LW2 HR 599443 O0 000' O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 11181.000 RHOB.LW2
PEF.LW2 -999.250 DCAL.LW2
GR.LW2 -999.250 HENA.LW2
DEPT. 11000.000 RHOB.LW2
PEF.LW2 3.892 DCAL.LW2
GR.LW2 35.023 HENA.LW2
-999.250 DPHI.LW2
-999.250 TNPH.LW2
-999.250 HEFA.LW2
2.713 DPHI.LW2
0.631 TNPH.LW2
256.125 HEFA.LW2
-999.250 DRHO.LW2
-999.250 ROPE.LW2
-999.250 TABD.LW2
-3.800 DRHO.LW2
24.100 ROPE.LW2
6.333 TABD.LW2
-999.250 20.471
-999.250
-0.029
46.896
5.646
LIS Tape Verifica%ion List, ing
Schlumberger Alaska Comput, ing Cen%er
6-JUN-1994 13'52
PAGE'
10
DEPT. 10593.000 RHOB.LW2
PEF.LW2 -999.250 DCAL.LW2
GR.LW2 90.768 HENA.LW2
-999.250 DPHI.LW2
-999.250 TNPH.LW2
-999.2S0 HEFA.LW2
-999.2S0 DRHO.LW2
-999.250 ROPE.LW2
5.113 TABD.LW2
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 94/06/ 6
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 94/06/ 6
ORIGIN : FLZC
TAPE NAME : 94190
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-54,$0-029-22470-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 94/06/ 6
ORIGIN : FLIC
REEL NAME : 94190
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-S4,50-029-22470-00