Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-059. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /¢/g,/..~.~ File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures-, graphs, charts- Pages: Poor Quality Original - Pages: D Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Diann<~~ Nathan Lowell Date:~///'~ [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: ~si "'-" STATE OF ALASKA "~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 194-059 303-049 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22470-00 4. Location of well at surface 9. Unit or Lease Name 551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM X = 681483, Y = 5998032 Point Mclntyre At top of productive interval 3808' SNL, 444' EWL, SEC. 13, T12N, R14E, UM X = 686055, Y = 5994885 10. Well Number At total depth P2-54 3954' SNL, 615' EWL, SEC. 13, T12N, R14E, UM X = 686230, Y = 5994743 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Point Mclntyre KBE = 45.62' ADL 034624 12. Date Spudded 04/29/1994 113' Date T'D' Reached 114' Date C°mp" Susp"'~r Aband' 115' Water depth' if °ffshore 116' NO' of Completions 05/10/1994 3/7/2003 N/A MSL Zero 17. Total Depth (MD+'I'VD)118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 11180 9141 FTI 11080 9059 FTI [] Yes [] NoI N/A MDI 1750' (Approx.) 22. Type Electric or Other Logs Run GR / NEU / DEN / RES / LWD 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110' 30" 260 SX Arctic Set (Approx.) 10-3/4" 45.5# NT80LHE 35' 3940' 13-1/2" 1166 sx CS III, 375 sx Class 'G' 7-5/8" 29.7# L-80 / 13Cr 31' 11164' 9-7/8" 590 sx Class 'G' 5-1/2" 17# L-80 5726' 10556' Scab 219 sx Class 'G' 24. Perforations open to Production (MD+'I'VD of Top and 25. TUBING RECORD Bottom and interval, size .a. nd.n~.u~m_ber) .------ SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, 9Cr 5666 MD TVD MD TVD 3-1/2", 9.2#, 13Cr 10500' 5711' & 10500' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMO, IJ~I~ KIND OF MATERIAL USED 10680' P&A witH' 20 .l~ls of Class 'G' cement 2003 on topk-o~and( '~" plug of 4000# of 20/40 Carbolite. 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO TEST PERIOD I FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core c~p.s.,~. No core samples were taken. Form 10-407 Rev. 07-01-80 ORIsiNAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. H RZ 10707' 8756' Kalubik 10769' 8805' Kuparuk 10789' 8821' NEP NAY 6 2003 $]. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 82. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubb,e ~'~~ Title TechnicalAssistant Date ~S"aT'"O~ -- P2-54 194-059 303-049 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. D#l/ing Engineer: Mark Johnson, 564-5666 INSTRUCTIONS GENE~AL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IT£M 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: P2-54A Accept: 03/17/03 Field: Point Mclntyre Spud: 03/20/03 APl: 50-029-22470-01 Release: 03/27/03 Permit: 203-030 Rig: Nordic #1 Date : :::::~:: .. PRE-RIG WORK 02/15/03 PPPOT-T PASSED TO 5000 PSI. (PRE-CTD) FMC CHECKED AND TORQUED ALL THE TUBING HANGER LDS TO 650 FT-LBS. 02/17/03 T/I/O = 2040/60/20. MONITOR WHP'S AND OA FL. (PREP FOR MITOA). OA FL NEAR SURFACE. 02/22/03 T/I/O 2040/650/0. MIT - OA TO 2000 PSI PASSED. (PRE CTD). OA FL NEAR SURFACE. PRESSURED OA TO 2000 PSI WITH 6 BBLS OF DIESEL. STARTED 30 MIN TEST. OA LOST 300 PSI IN 15 MIN. RE-PRESSURED OA TO 2000 PSI. OA LOST 30 PSI IN 15 MIN AND A TOTAL OF 40 PSI IN 30 MIN. BLED OA TO 0 PSI. FINAL WHP'S = 2040/650/0. 02/23/03 ,5CANNED 8 2003 T/I/O- 2250/720/50. MONITOR WHP'S POST MIT-OA. 02/28103 WELL SI ON ARRIVAL. RAN FLAPPER CHECKER. VALVE PARTIALLY CLOSED @ 3500# CL PSI. STROKED TRSV, CHECKED OUT OK @ 5000# CL. DRIFTED W/2.50" CENT. TO 10991' SLM - ((CORRECTED DEPTH = 11,015')) (SAMP BLR EMPTY). SET DOWN @ 10504' WLM BUT ABLE TO WORK FREE. LEFT WELL SI. 03/02/03 RIH W/JET BLASTER TO 10,700'. PUMP BEADS THROUGH JET BLASTER FROM 10,700' TAG DEPTH OF 11,039' MAKING 2 PASSES THROUGH INTERVAL. POOH @ 80%. FREEZE PROTECT TBG TO 2000' WITH MEOH. FREEZE PROTECT FLOW LINE. UNABLE TO RIG DOWN DUE TO HIGH WINDS. DECIDE TO MILL XN NIPPLE. RIH WITH WFD 2 3/8" PDM MOOR & 2.80" DIAMOND SPEED MILL. TAG X-NIPPLE (2.813") AND MILL THROUGH (8 STALLS). 03/03/03 MILL X-NIPPLE @ 10478' W/2.80" DSM. RIH AND START MILLING XN NIPPLE, HAD ONE STALL TO 2400 PSI AND DID NOT SEE ANY MORE MOTOR ACTION. RIH AND TAG 52' HIGH. APPEARS TO HAVE BACKED OFF THE qT. POOH. HIT TIGHT SPOT - 10,500' (10K OVERPULLS). MILLED THROUGH THIS SECTION AND SEEMED TO CLEAN UP (PACKER ID 2.78" W/2.8" MILL, "2.79" DRIFT"). POOH. MU PDS MEMORY GR/CCL. RIH TAG HIGH AT 10807' CTMD, ATTEMPT TO WORK PAST WHILE PUMPING DOWN THE COIL WITH OUT SUCCESS. LOG FROM 10807' CTMD TO 9000', POOH. CORRECT TAG IS 10,819' ELMD, INTERPRETATION OF THE COLLAR LOG INDICATES THAT THE TAILPIPE SWIVELED OFF 10' BELOW THE PACKER. RIG DOWN. WELL IS FREEZE PROTECTED TO 2000' WITH 60/40 MEOH. JOB COMPLETE. O3/O4/O3 D&T WITH 2.77" CENT TO 10835, CALIPER LINER FROM 10800' TO 9546', PULLED SO GLV FROM STATION #5, PULL LGLV FROM STATION #3. 03/05/03 SET DGLV'S AT STATIONS #1,3, 5, GLM'S. LOADED IA WITH 60/40 & CRUDE, MITIA PASSED TO 2500 PSI. BLED IA TO 0 PSI. SHUT IN. 03/06/03 CHANGE PROGRAM AND ADD LOGGING RUN TO Tr. RIH W/LOGGING TOOLS. P2-54A, Coil Tubing Drilling Page 2 03/07/03 RIH W/LOGGING TOOLS. LOG FROM TOP OF TT @ 10,808' TO 10,400' CTMD. CORRECT DEPTH OF TOP OF'l-r= 10,826'. RIH W/2.5 BALL DROP NOZZLE. LAY IN 4000 # OF 20/40 CARBO~D 13 BBLS OF NEAT 17 PPG CEMENT AND 7 BBLS WITH 15 PPB AGGREGATE FOR A TOTAL ~LS. ACHIEVE 2 BBLS BEHIND PIPE.MAKE THREE PASSES WITH BIOZAN TO CLEAN HOLE FRO~00' TO 10660' (TOC). POOH WASHING ALL GLM'S MANDRELS. WASH TREE AND BOP'S. FREEZE PROTECT TUBING WITH 40 BBLS 60/40 METHANOL. JOB COMPLETED. 03/12/03 RUN 2.5" CENT TAG CEMENT @ 10680'SLM. PT TBG TO 1000 PSI - GOOD TEST. TURN WELL OVER TO DSO. WELL TO REMAIN SHUT IN FOR CTD. 03/13/03 VALVE SHOP TESTED THE MV, SV, AND WV TO 3500 PSI. OK. 03/14/03 TIO= 800/600/0 BLEED TBG & IA TO 0 PSI (PRE- CTD). BLED TP & lAP TO 0 PSI; ALL FLUID. FINAL WHPS= 0/0/0. ARCO Page 1 ~ Operations Summary Report Legal Well Name: P2-54 Common Well Name: P2-54 Spud Date: 4/18/1994 Event Name: REENTER+COMPLETE Start: 3/12/2003 End: 3~28~2003 Contractor Name: NORDIC CALISTA Rig Release: 3~27~2003 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 311712003 00:00 - 02:00 2.00 BOPSUR P PRE Accept rig at 00:00 on 311712003. NU BOP. 02:00 - 03:00 1.00 BOPSUR P , PRE Install ddp pan. MU 2" test joint. Take on fluid. 03:00 - 10:00 7.00 BOPSUR P PRE Test BOPE to 250 / 3,500 psi as per BP policy and AOGCC regulations. Witness of test waived by Chuck Scheeve of AOGCC. Top 2" combo rams not holding. Inspect rams and verify deminsions. Switch rams to other cavity & re test OK. Continue testing BOPE. Meanwhile R/U hard line to reel & changeout injector gripper blocks for 2" CT. 10:00 - 11:00 1.00: S'I'WHIP P WEXlT P/U injector. M/U packoff. Prep to stab CT. Meanwhile BHI MWD checking out their tools. 11:00 - 11:15 0.251 STWHIP P WEXlT Held PJSM for stabbing CT. 11:00 - 13:00 2.00! STWHIP P WEXIT Pull coil from reel across pipe shed roof. Install depth counter & stab CT thru gooseneck & injector. DS tech building a depth encoder connector for tieing BHI MWD depth encoder to the rig depth tracking system -,. the one used on the last 2" CT job is missing. 13:00 - 13:45 0.75 STWHIP P WEXlT Cut coil. GBR welder install DS weld-on CTC (ID = 0.996"). Round off weld to ensure no square edges catching on TT. Pull test to 22k ~ OK. 13:45 - 14:45 1.00 STWHIP P WEXlT Press test hardline & inner reel valve to 3500psi ~ OK. Install dart catcher. Load wiper dart. Launch & chase/fill CT with 3% KCL. Dart hit @ 36bbls. Dart stuck @ CTC. 14:45 - 15:45 1.00 S'I'WHIP N MISC WEXIT Cut coil & weld-on another CTC (ID = 1.05"). Pull test to 22k ~ OK. Test CTC to 3500psi ~ OK. Baker confirms that dart for cement job is slightly different from the one pumped. Will have to pump another dart to confirm it can pass'thru the 1.05" ID CTC before the cement job. 15:45 - 16:00 0.25 STWHIP P WEXlT !Open up well, bleed off WHP & monitor ~ obserVe 0psi WHP. BHI hook up their MWD transducer to CT hardline. 16:00 - 16:30 0.50 S-I'WHIP P WEXlT Held pre-operations safety meeting. Reviewed well plan, potential hazards & BHA M/U procedure. Emphasize strict adherence to procedures. 16:30 - 18:00 1.50 STWHIP P WEXIT M/U cement milling BHA #1 with 2.74" HC D331 mill, 2-3/8" motor with 1.75deg ABH, GR-DIR MV~.D,,j.'.30~d.e,g,~ orienter, 2 jts of 2-1'16" t~~' 18:00 - 18:30 0.50 STWHIP P WEXlT Crew change & pre tour safety meeting. 18:30 - 22:30 4.00 STWHIP N WAIT WEXIT Wait on BHI to get depth encoder. 22:30 - 23:00 0.50 S'I-WHIP ~ WEXIT MU injector to BHA. RIH. Flow test MWD. 23:00 - 23:45 0.75 STWHIP N DFAL WEXIT MWD not reading pressure. Trouble shoot MWD. Change 3ressure transducer. 23:45 - 00:00 0.25 STWHIP ~ WEXlT Flow test MWD. RIH. 3/18/2003 00:00 - 01:30 1.50 STWHIP :) WEXlT RIH to 8,000'. 01:30 - 03:00 1.50 STWHIP :) WEXIT Calibrate MWD depth. 03:00 - 03:20 0.33 S'I'WHIP :) WEXIT RIH. Tag cement top at 10,677'. 03:20 - 05:00 1.67 STWHIP :~ WEXlT Pull up hole to 10,577'. Log down for tie in. Add 10'. 05:00 - 05:30 0.50 STWHIP :) WEXlT Orient TF to LS. Retag TOC @ 10687'. 05:30 - 05:35 0.08 STWHIP :~ WEXlT Start LS pilot hole. Mill cement to 10689' with 175R TF, 1.5/1.5bpm, 2760/3040psi, 2k WOB & 24fph ave ROP. 05:35 - 06:25 0.83 STWHIP :~ WEXlT Orient 2 clicks. Reorient to 180. 06:25 - 06:30 0.08 STWHIP :) WEXlT Mill cement to 10691' with 150R TF, 1.5/1.5bpm, 2800/3000psi, 2k WOB & 10fph ave ROP. 06:30 - 06:55 0.42 STWHIP :) WEXIT Orient 1 click & mill cement to 10697' with 180 TF, 1.5/1.5bpm, 2800/3000psi, 2k WOB & 14fph ave ROP. TF walking to the Printed: 3/31/2003 11:01:32 AM ARCO page 2 ~ OperatiOns summary ,Report Legal Well Name: P2-54 Common Well Name: P2-54 Spud Date: 4/18/1994 !Event Name: REENTER+COMPLETE Start: 3/12/2003 End: 3~28~2003 Contractor Name: NORDIC CALISTA Rig Release: 3~27~2003 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT PhaSe DescriptiOn :of operations:: :: 3/18/2003 06:30 - 06:55 0.42 STWHIP P WEXiT right. 06:55 - 08:15 1.33 STWHIP P WEXlT Orient 1 click & mill cement to 10716' with 150L-180 TF, 1.5/1.5bpm, 2800/3000psi, 2k WOB & 14fph ave ROP. 08:15 - 08:25 0.17 STWHIP N DEAL WEXlT MWD quit pulsing. Resync MVVD tool. 08:25 - 09:25 1.00 STWHIP P WEXlT Odent TF to 180. Meanwhile observe GRAX reading maxed out ca 250APl ~ could be due to scale or tool failure. Decide to retie-in to check if tool is still working OK. :09:25 - 09:35 0.17 STWHIP P WEXlT PUH to 10570' & observe GR reading normal. Still decide to retie-in to be absolutely sure of our depths. 09:35 - 11:00 1.42 STWHIP P WEXlT Log down @ 45fph & tie-into GR marker using SWS 03/07/03 GPJCCL correlation log. Had -1' correction. However GR is ca 20 APl hotter. 11:00 - 11:15 0.25 S'I'WHIP P WEXlT PUH intoTT @ 10421' ~ observe no restrictions. Resync MWD tool & RBIH. 11:15-12:55 1.67 STWHIP P WEXlT Mill cement to 10750'with 150L-180 TF, 1.5/1.5bpm, 3000/3430psi, 2k WOB & 20fph ave ROP. GR reading normal again. MWD tool pulsing intermittently. Decide to increase rate & see if it can steady-up the tool. Freespin @ 1.8bpm = 3600psi 12:55 - 14:15 1.33 STWHIP P WEXlT Mill cement to 10770' with 150L-180 TF, 1.8/1.8bpm, 3600/3800psi, 2k WOB & 15fph ave ROP. Loosing fluid over shakers. Meanwhile audit team carryout ISO 14001 EMS maintenance audit on rig ~ once again passed with flying colors. 14:15 - 14:30 0.25 STWHIP! N DFAL WEXlT MWD quit pulsing.-PJ, J._.H_~to__ 10600' to resync MWD tool. Troubleshoot & try several flow ratesTchec, k transducer ~ no luck. 14:30- 16:30 2.00 STWHIP N DEAL WEXlT POOH forMWD. 16:30 - 18:45 2.25 STWHIP N DFAL !WEXlT OOH. S/B injector. Flush BHA. Retrieve MWD probe & observe pulser plugged with green tape & some debris. Function test r~.D. probe& reinstall. M/U coil & injector. 2.25 STWHIP N DEAL WEXlT I~H~l~'~-I~R~/~j3~er~. 2_.~ro. irJSHT. RIH 18:45-21:00 21:00- 21:55 0.92 STWHIP N DFAL WEXlT Log tie-in------ '~'down fro~q~6~'-~)d~{~,~ 21:55 - 22:10 0.25 STWHIP N DEAL WEXlT RIH and tag TD at 10770' 22:10 - 22:30 0.33 STWHIP N DEAL WEXlT Orient to Iow side from 150R 22:30 - 23:40 1.17 STWHIP P WEXlT Mill cement Iow side from 10770' 1.5/3500/180R 20-30'/hr 1-2k WOB 100~ diff to 10799' 23:40 - 00:00 0.33 STWHIP P WEXlT PUH to 10680'. Orient to high side 311912003 00:00 - 01:30 1.50 STWHIP, P WEXlT Continue to orient to high side-weak odentor and slow BHI detection of signal 01:30 - 02:00 0.50 STWHIPIP WEXlT Mill cement HS 10799-808' 1.5/3500/15L 02:00 - 03:20 1.33 STWHIP!P WEXlT POOH for window mill assy 03:20 - 04:05 0.75 STWHIP P WEXlT ~LD pilot mill and motor. MU window milling assy 04:05 - 06:20 2.25 STVVHIP P WEXlT RIH w/BHA #2 (2.74" WM, 2.5 deg motor) 06:20 - 06:35 0.25 STWHIP P WEXlT Corr +10' at 10600'. Chk TF 150L. Orient to 15L. S/D pump. 06:35 - 06:40 0.08 STWHIP P WEXlT RIH. Saw slight bobble @ top of pilot hole. Tag csg wall @ 10808'. 06:40 - 06:50 0.17 STWHIP P WEXlT P/U 10'. Check TF ~ 60R. PUH to 10750'. 06:50 - 07:25 0.58 STWHIP :) WEXlT Orient TF around to 15L. S/D pump. 07:25 - 07:40 0.25 STWHIP :) WEXlT RBIH to 10804'. Bdng on pumps to 1.Tbpm/3550psi. Zero WOB @ 11.2k down wt. TF @ 5L. Tag & see MW @ 10805'. Correct to 10808'. Flag pipe & P/U 1'. TF @ 10L. 07:40 - 12:13 4.55 STWHIP :) WEXlT Start time milling window as per time schedule. Mill to 10808' Printed: 3/31/2003 11:01:32 AM ARCO Page 3 ~ Operations Summary"Report ......... Legal Well Name: P2-54 Common Well Name: P2-54 Spud Date: 4/18/1994 Event Name: REENTER+COMPLETE . Start: 3/12/2003 End: 3~28~2003 Contractor Name: NORDIC CALISTA ~t~~~~L~03 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 311912003 07:40 - 12:13 4.55 STWHIP P WEXlT with 10-5L TF, 1.6/1.6bprn, 3450psi, Ok WOB. 12:13 - 15:29 3.27 STWHIP P WEXlT Mill to 10808.1' with 5L TF, 1.6/1.6bpm, 3450psi, Ok WOB. Stall lx @. P/U to string wt & get out of stall. Continue milling to 10809' with 15L TF, 1.611.6bpm, 3450psi, 0-2k WOB. 15:29 - 17:12 1.72 STWHIP P WEXlT Mill to 10810' with 15-2L TF, 1.6/1.6bpm, 3750/3920psi, 0-2k WOB. Seeing metal shavings on the shaker. 17:12 - 18:25 1.22 STWHIP P WEXlT Mill to 10810.8' with 2L TF, 1.611.6bpm, 3750/3920psi, 0-2k WOB. Stall 2x. P/U & get out of stall. Looks like we're out. 18:25 - 20:40 2.25 STWHIP P WEXlT Drill open hole at 8'/hr to 10814.8' and stack 6k 1.4/3200/10R. Wiper back thru window and resumed making hole, albeit slow. Drill to 10820'. Window depths (for now) are 10808-811' 20:40 - 22:10 1.50 STWHIP P WEXlT Wiper back thru OH and window. POOH for tapered mill 22:10 - 23:00 0.83 STWHIP P WEXlT LD window milling assy. Mill was 2.73"+ and in real good shape-little center wear. MU 2.72" tapered mill and used 1.75 deg motor 23:00 - 00:00 1.00 STWHIP P WEXIT RIH w/BHA #3 3~20~2003 00:00 - 00:45 0.75 STWHIP P WEXlT Continue RIH wi tapered mill assy 00:45 - 01:20 0.58 STWHIP P WEXlT Log tie-in down from 10600' 1.7/3690/25L Add 10.0' 01:20 - 04:45 3.42 STWHIP P WEXlT RIH at rain rate and tag at 10820'. See flag at 10818.5' (should be at 10808'), muse muse. PUH and chk TF at 1.5/3150/30L Backream above tag twice wi no motor work. Assume flag is correcl; depth in relation to window, but did not correct. Start pump and got good stall at 10819.6' @ 30L. Get a click and dress from 10819.6' at 5L with about 8 stalls to 10821'. RIH clean at 0.2'/min to tag at 10827.4' 04:45 - 06:10 1.42 S'I'WHIP P WEXIT Backream at 1.4/2770/15L to 10816', clean. RIH at min rate to TD, get a click. Repeat at 5R, clean. Repeat at 20R, clean. Repeat at 50R, clean. Repeat at 50R (missed the click), clean 06:10 - 08:00 1.83 STWHIP P WEXIT PUH and log down from 10590' 1.412750/80R. Tie-into Geology PDC log (SWS CDN open hole log of 05/11/94) & subtracted 16' from CTD. Corrected depths are: TOW = 10798', BOW = 10802' & end of rat hole = 10811'. Paint EOP @ 10540'. Decide to RBIH to confirm TD. 08:00 - 08:40 0.67 STWHIP N MlSC WEXIT RBIH & tag TD @ 10811'. 08:40 - 10:00 1.33 STWHIP P WEXIT POOH window dressing BHA. 10:00 - 11:15 1.25 STWHIP P WEXIT OOH. L/D window dressing BHA. Crayola guages 2.72" go / 2.71" no-go. Check MWD probe ~ OK. 11:15 - 12:00 0.75 DRILL P PROD1 M/U drilling BHA ~ with 2.69" x 3.0" DPI bicenter bit, 2-3/8" motor with 2.12deg bend, GR-DIR MWD, new 30 degs orienter & MHA (OAL = 50.79'). Scdbe tools. 12:00 - 13:20 1.33 DRILL P PROD1 Cut 115' of coil & weld-on a new CTC (ID = 1-1/16"). Pull test & pressure test ~ OK. 13:20 - 14:15 0.92 DRILL P PROD1 Install dart catcher. Load wiper dart (same one for liner cement). Launch & chase with 3% KCL. Dart hit @ 40.4bbls. Retrieve dart easily. 14:15 - 16:10 1.92 DRILL p PROD1 RIH drilling BHA#4. Saw flag on depth. RIH to 10600'. 16:10 - 17:05 0.92 DRILL P PROD1 LOg GR & tie-into Geology PDC log. No correction to CTD. 17:05- 17:10 0.08 DRILL P PROD1 S/D pump, RIH &tagTD@ 10811'. 17:10 - 17:30 0.33 DRILL P PROD1 Check TF ~ 105R. Orient TF to 30R. 17:30 - 19:20 1.83 DRILL P PROD1 Start ddlling build section '. Ddll to 10830'~ ' 1~350/350 _ ' . . . .. Meanwhile start ' .5ppg, flopro mud downhole. 19:20 - 20:40 1.33 ~ E,~-~~ 10850' 1.713150130R Hole displaced w/new mud. Start Printed: 3/31/2003 11:01:32 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 45.62' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Point Mclntyre P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 8. Well Number 4. Location of well at surface P2-54 // 551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM X = 681483, Y = 5998032 9. Permit Numb. pr At top of productive interval 194-059 3808' SNL, 444' EWL, SEC. 13, T12N, R14E, UM X = 686055, Y = 5994885 10. APl Number At effective depth 50-029-22470-00 3917' SNL, 571' EWL, SEC. 13, T12N, R14E, UM X = 686186, Y = 5994779 11. Field and Pool At total depth Point Mclntyre 3954' SNL, 615' EWL, SEC. 13, T12N, R14E, UM X = 686230, Y = 5994743 12. Present well condition summary Total depth: measured 11180 feet Plugs (measured) true vertical 9141 feet Effective depth: measured 11080 feet Junk (measured) true vertical 9059 feet Casing Length Size Cemented MD TVD Structural Conductor 80' 20" 260 sx Arcticset (Approx.) 110' 110' Surface 3905' 10-3/4" 1166 sx Coldset III, 375 sx Class 'G' 3940' 3721' Intermediate Production 11133' 7-5/8" 590 sx Class 'G' 11164' 9128' Liner Scab Liner 4830' 5-1/2" 219 sx Class 'G' 5726' - 10556' 5046' - 8639' Perforation depth: measured 10794' - 10824', 10844' - 11008' true vertical 8825' - 8850', 8866' - 9000' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 9Cr to 5666'; 3-1/2", 9.2#, 13Cr to 10701' Packers and SSSV (type and measured depth) 4-1/2" Camco TRCP-4A SSSV at 2185'; 5-1/2" ZXP Mechanical Liner Top packer at 5711'; 3-1/2" Baker SABL-3 packer at 10500' 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation 15. Status of well classifications as: February 23, 2003 ~ [] Oil [] Gas [] Suspended 16. If proposal was verbally approved Service Name of approver Date Approved Contact Engineer Name/Number: Mark Johnson, 564.5666 Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is tru, e~and correct to the best of my knowledge , Sign ed Torde H ubb,, ~.,,¢.~,~_ ~j [~.~w~_.~itle CT Drilling Engineer Date Conditions of Approval' Notify Commissior~-~ representative may.witness I · v I /~pp~vv~ ~'~v. ~' ~ Plug integrity BOP Test ~ Location clearance I ' Mechanical lntegrity Test X Subsequentformrequiredl0-q~7 IApproved b¥ order of the Commission ORIel _N~.~ ~~¥r ~ .?~ !~ Commissioner Date .~...~..~/~ Form 10-403 Rev. 06/15/88 ,SC/~NNEC MAR [ ~ FEB 19 2003 Triplicate To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Mark O. Johnson CTD Engineer Date: February 13, 2002 Re: P&A operations for well P2-54 in prep for a CTD sidetrack / Well P2-54 is scheduled for a through tubing sidetrack with the SL~J~Nb/r~dic I Coiled Tubing Drilling rig. The sidetrack, P2-54A, will kick off from a cement ramp window a,t/l'0~md. The P2-54A target is the Pt. Mac formation. The following describes work planned to prep for ~acking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre CTD P&A Summary (expected to beqin 2/23103) 1. Slickline - Drift tubing and tag bottom. 2. Service coil - Scale blast tubing and casing. / 3. Slickline _ Drift tubing for caliper..,¢atil~er casing and tubing. DummyGLVs. MITIA/OA. 4. Service coil - P&A wellbor¢ with/24 ~ars of 17 ppg class G cement for cement ramp window. TOC is planned for 10715' md. ¢ ~ /' 5. Other - WOC, PT wellbore to 1000 psi. P&A complete. If the cement were to fail the pressure/. test, a second squeeze is not planned since this portion of the wellbore will be isolated by cement during the primary cement job of the new sidetrack liner. Bleed flowlines to zero and ensure valves hold. Remove wellhouse. CTD Sidetrack Summary (expected to be,qin -315103) 1. MIRU CTD rig 2. Mill out 2.635'XN nipple and mill cement ramp window. 3. Drill 2.75"x 3' openhole to ~11840' TD with MWD/GR. 4. Run and cement 2 3/8" liner 5. RDMO. Pre CTD P&A work is slated to begin on 2/23/03. Drilling coil is scheduled to mill the window and drill the sidetrack ~3/5/03. Mark O. Johnson/~/ CID Drilling Engineer CC: Well File Sondra Stewman/Terrie Hubble OANNtED MAR 1 0 2003 "'° P2 54 SAFEI'Y NOTES: 4-1/2" & 3-1/2" CHROME ~TIJATOR =,. ,.,~B~,,,K,~ ~ - -- TBG IN WELL. 7-5/8" CSG X'S OVER FROM KB. ELEV = 46.95' L-80 TO 13CHROME @ 10039'. ~ax Angte = 43 @ 8493' f ~ i ~ I GAS LIFT MANDRELS ~ J I I ~ ST MD '[VD DEV TYPE VLV LTCH PORT DATE r ir ~ I 2 561o 4960 42 TMPOX DV BK! 0 01/05/01 Minimum ID 2.635" 10679' I I ~ = 3 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01 (~~==~'1 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01 3-1/2" HES XN NIPPLE I ! 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01 Ii!~ 6 9672 7972 42 KBG-2-9 DV INT 0 01/05/01 [7-5/8" MARKER JOINTS (2 JTS = 39') I'~ 10722' Mil 10715' I-~ ELMDWLOGGED04/09/01 [ PERFORATION SUMMARY REF LOG: SPERRY RES/GR of 05/11/94 ~ ANGLE AT TOP PEP, F: 36 @ 10794' Note: Refer to Production DB for historical perf data SIZE SPF INTI~VA L Opn/Sqz DATE 3-3/8" 6 10794 - 10824 O 07/22/94 3-3/8" 6 10844 - 10904 O 07/22/94 3-3/8., 6 10904-11008 0 07121/94 DA'ri REV BY C..OMMI~IT$ DATE REV BY COMMENTS POIN'r MCll~Ff RE UNIT 05/13/94 ORIGINAL COMPLE-['ION WELL: P2-54 04/19/00 RWO PERMIT No: 194-0590 11/28/00i SlS-lsl CONVERTED TO CANVAS APINo: 50-029-22470-00 02/21/01 SlS-LG REVISION SEC 14, T12N, R14E, 550' SNL & 1233' EWL I ~ ~, ST MD -IYD DEV TYPE VLV LTCH PORT DATE 1 4331 4010 43 TMPDX DOME BK 16 01/05/01 2 5610 4960 42 TMPDX DV BK 0 01/05/01 3 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01 ~ 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01 6 9672 7972 42 KBG-2-9 DV INT 0 01/05/01 7 10413 8529 40 KBG-2-9 DV INT 0 01/05/01 SIZE SPF INTI~VA L Opn/Sqz DATE 3-3/8" 6 10794 - 10824 O 07/22/94 3-3/8" 6 10844 - 10904 O 07/22/94 3-3/8" 6 10904 - 11008 O 07/21/94 TREE= 4-1/16" CIVV ACTUATOR = BAKER C m TBG IN WELL 7-5/8" CSG X'S OVER FROM KB. ELEV = 46.95' L-80 TO 13CHROME @ 10039'. BF. ELEV = 14' ................................ KOP= "i'~)~'~; I 1 Max Angle: 43 1~ 8493' ~'~J~'~'l~'; ............... 'J (~8;1'~; ~K~05~ i ' t 2185' H 4-1/2" CAMCO TRCP-4A, TRSV, D = 3.812" GAS LIFT MANDRELS 1 4331 4010 43 TMPDX DOMEi BK 16 01/05/01 ~ 2 5610 4960 42 TMPDX DV BK 0 01/05/01 Minimum ID = 2.635" (~ t0579' / '~'-- 3 7216 6141 43 KBG-2-9 DOME INT 16 '01/05/01 m._ 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01 3'112" HE$ XN NIPPLE I 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01 6i 9672 7972 42 KBG-2-9 DV [ INT 0 01/05/01. L I 7 10413 8529 40 ! KBG-2-g) DV INT 0 ~01/05/01 × × × I7-~8,, ~R~ER ~0,~ (2 ~ ~ ~9') ]~ I ~0~' I-'t E.~D ~ ~0~04/09/01 I T' Or- ANGLEATTOPPERF: 36 @ 10794' Note:RefertoP(oductionDBforhis,ricalperfdata 'cmtramp ~' SIZE SPF INTERVAL Opn/Sqz DATE ;window 13-3/8" 6 10844- 10904 O 07/22/94 3-3/8" 6 10904 - 11008 O 07/21/94 I .... nted liner 11840' 13-CR, 0.045Obpf, ID=6.875" I 1 DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 05/13/94 ORIGINAL COMPLETION 02/13103 moj ctd sidetrack proposed WELL: 1=2-54 04/19/00 , RWO PERMIT No: 194-0590 11/28/00 SIS-bi !CONVERTED TO CANVAS ARNo: 50-029-22470-00 02/21/01 SIS-LG REVISION SEC 14, T12N, R14E, 550' SNL & 1233' 10/08/01 CH/KAK !CORRECTIONS BP Exploration (Alaska) SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10794 - 10824 O 07122/94 3-3/8" 6 10844 - 10904 O 07/22/94 3-3/8" 6 10904 - 11008 O 07/21/94 DATE REV BY COMMENTS DATE REV BY COMMENTS 05/13/94 ORIGINAL COMPLETION 02/13/03 moj ctd sidetrack proposed 04/19~00 RWO 11/28/00 SIS-bi ~CONVERTED TO CANVAS 02/21/01 SIS-LG REVISION 10/08/01 CH/KAK !CORRECTIONS SUBJECT ENGINEERING DATA SHEET NO.__ OF__ BASED ON ENGINEER DEPT. APP'VL DATE BUDGET/AFE NO. FILE NO. ! Io7/5 ET-~ ~.~75 //~1o AK 2337-1 (11/00) 2003 STATE OF ALASKA ALASKA ~J~L AND GAS CONSERVATION COMM~O$1ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) ARCO Alaska Inc. [] Development KBE = 45.62' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Point Mclntyre P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM P2-54 At top of productive interval ~.~-~. '~ i~;:- ~r' -'-~ '~ ;7 ~' "i~/7~'~i~_ ~'~,' 9. Permit Number / Approval No. ~-.,.: ~.--- -,.~ , ~--, ;: 194-059 3806' SNL, 443' EWL, SEC. 13, T12N, R14E, UM '" '~:~; ..... '"'"' ....... ' ~' ~"~;/ 10. APl Number At effective depth 50-029-22470-01 3909' SNL, 563' EWL, SEC. 13, T12N, R14E, UMN!^Y02 ~00~ 11. Fieldand Pool At total depth Point Mclntyre 3953' SNL, 614' EWL, SEC. 13, T12N, R14E, UM, 12. Present well condition summary Total depth: truemeasuredvertical 11180 feet9142 feet Plugs(measured)ORIGINAL Effective depth: measured 11063 feet Junk (measured) true vertical 9046 feet Casing Length Size Cemented M D TVD Structural Conductor 80' 20" 260 sx Arcticset (Approx.) 110' 110' Surface 3905' 10-3/4" 1166 sx Coldset III, 375 sx Class 'G' 3940' 3721' Intermediate Production 11133' 7-5/8" 590 sx Class 'G' 11.164' 9129' Liner Scab Liner 4830' 5-1/2" 219 sx Class 'G' 5726' - 10556' 5046' - 8640' Perforation depth: measured 10794' - 10824', 10844' - 11008' true vertical 8826' - 8851', 8867' - 9001' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr to 5666'; 3-1/2", 9.2#, 13Cr to 10701' Packers and SSSV (type and measured depth) 4-1/2" Camco TRCP-4A SSSV at 2185'; 5-1/2" ZXP Mechanical Liner Top packer at 5711'; 3-1/2" Baker SABL-3 packer at 10500' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: I-I Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations 17. I hereby certify that the fore, going is trqe and correct to the best of my knowledge Signed TerrieHubble ~/~~(~~~ Title TechnicalAssistantlll Date'-'"'-~ '"'- "-'--~'(_.~/'(..~(..~ · Prepared By Name/Number: Terrie Hubble, 564-4628 Submit In Duplicate'-' ~ Form 10-404 Rev. 06/15/88 Progress Report Facility Pt Mac 2 Well P2-54 Page 1 Rig Nabors 9ES Date 24 April 00 Date/Time 07 Apr O0 11:01-06:00 11:01-06:00 08 Apr 00 06:00-00:00 06:00-00:00 09 Apr 00 00:00 Duration 18-3/4 hr 18-3/4 hr 18hr 18hr 00:00-06:00 00:00-02:30 6hr 2-1/2 hr 02:30 02:30-04:00 04:00 1-1/2 hr 04:00-06:00 2 hr 06:00-13:30 7-1/2 hr 06:00-10:00 4 hr 10:00 10:00-10:30 1/2 hr 10:30 10:30-13:00 2-1/2 hr 13:00 13:00-13:30 1/2 hr 13:30 13:30-15:30 2 hr 13:30-14:00 1/2 hr 14:00 14:00-15:30 1-1/2 hr 15:30 NIAY 0 2 2000 Activity Move rig Rig moved 75.00 % Move rig camp and shop to opposite side of DS 3. Move off well at 1700 hrs, off DS 3 at 1800 hrs. Arrive at PM ice road bypass at 0430 hrs. Drive out onto rig mats. Shuttle mats around rig. Preparing to make 2nd jump on mats. No problems/delays. Move rig (cont...) Rig moved 100.00 % At well location - Slot Move pits and sub across ice road, raise derrick and spot rig over P2-54. Move camp and workshop to P2-54. Spot Pit complex, workshop and camp. R/U Top drive. Prepare rig for taking on fluid. Wellhead work Installed Accessories Install secondary valve on live annulus and install flowline while taking on 10.0 ppg brine. Equipment work completed Retrieved Hanger plug Equipment work completed Hook up lines to Xtree and test to 3500 psi. Retrieve hanger plug with DSM. Tubing pressure @ 600 psi, annulus @ 150 psi. Circulated at 10165.0 ft Commence circulating out Freeze Protect from well. Wellhead work (cont...) Circulated at 10165.0 ft Stopped: To hold safety meeting Recover 175 bbls contaminated crude & diesel from tubing and annulus ( should be 84 bbls). Held safety meeting Completed operations Hold H2S drill and conduct Pre-spud meeting with Pad Operator and crews to discuss SIMOPS and ESD systems. Circulated at 10165.0 ft Obtained bottoms up (100% annulus volume) Circulate bottoms up with 10 ppg brine @ 3 BPM/150 psi. Loosing @ 20-25 bbls/hr. Flow check In 0.50 hr had 10.000 bbl Loss at wellhead Flowcheck well- static losses of 15-20 bbls/hr. Wellhead work Installed Hanger plug Equipment work completed Install TWC and test from below to 200 psi ( unable to get higher due to losses). TWC holding. Removed Xmas tree Equipment work completed Remove Xtree and adaptor flange. Remove tree from cellar for inspection. Pressure up on SSSV control lines and tie off same around hanger neck. Inspect hanger threads- good. Progress Report Facility Pt Mac 2 Well P2-54 Page 2 Rig Nabors 9ES Date 24 April 00 Date/Time 15:30-21:00 15:30-18:00 18:00 18:00-21:00 21:00 21:00-22:00 21:00-22:00 22:00 22:00-06:00 22:00-02:00 10Apr 00 02:00 02:00-06:00 06:00-16:30 06:00-06:30 06:30 06:30-15:30 15:30 15:30-16:30 16:30 16:30-06:00 16:30-18:00 18:00 18:00-19:30 19:30 19:30-03:30 llApr00 03:30 03:30-04:30 04:30 Duration 5-1/2 hr 2-1/2 hr 3hr lhr lhr 8hr 4hr 4hr 10-1/2 hr 1/2 hr 9hr lhr 13-1/2 hr 1-1/2 hr 1-1/2 hr 8hr MAY 02_ 2000 Activity BOP/riser operations - BOP stack Rigged up BOP stack Equipment work completed N/U BOPE and flowline pitcher and nipple. Hook onto wellhead annulus and maintain hole fill- loosing @ 24 bbls/hr. Tested BOP stack Pressure test completed successfully - 3500.000 psi RfU and test BOPE to 250/3500 psi. John Crisp of AOGCC waived witness. Wellhead work Removed Hanger plug Equipment work completed R/U DSM and pull TWC. Clear rigfloor. Pull Gas lift completion, 4-1/2in O.D. Retrieved Tubing hanger Equipment work completed M/U landing string to Hanger. BOLDS. Pull hanger to rigfloor. R/U chrome handling equipment. L/O landing joint and tubing hanger. While conducting these operations flowcheck well- loosing @ 10-15 bbls /hr. Laid down 2200.0 ft of Tubing POOH laying down 4.1/2" Chrome tubing. 52 joints @ report time, @ SSSV. Well looisng 15 bbls/hr. Filling hole with 9.8 ppg brine. Pull Gas lift completion, 4-1/2in O.D. (cont...) Retrieved SCSSSV Completed operations L/D Camco SSSV and R/D control line pulling equipment. SSSV transported to Camco shop for inspection. Laid down 10165.0 ft of Tubing Fish at surface POOH laying down 4.1/2" Chrome, L-80 tubing. Visually in very good shape. 253 joints recovered and 1 x cut off @ 3.89 ft. 7 x GLM's. Rigged down Completion string handling equipment Equipment work completed R/D Chrome Handling Equipment and clear rigfloor. BHA run no. 1 Rigged up Drillstring handling equipment Equipment work completed Load pipe shed with DC's. Clean rig and prepare to P/U BHA. Install wear ring. Made up BHA no. 1 BHA no. 1 made up M/U BHA #1 - Overshot assembly w/4.5" basket grapple. Singled in drill pipe to 10103.0 ft 240 joints picked up Fished at 10148.0 ft Fish came free Up weight -- 195 klbs, down weight 150 klbs. Wash over fish @ 2 BPM/200 psi. Engage fish @ 10,148'. Facility Date/Time 12 Apr 00 Progress Report Pt Mac 2 Well P2-54 Rig Nabors 9ES Page 3 Date 24 April 00 Duration Activity 04:30-06:00 04:30-06:00 06:00-09:30 06:00-08:00 08:00 08:00-09:30 09:30 09:30-04:00 09:30-10:30 10:30 10:30-14:00 14:00 14:00-15:30 15:30 15:30-16:00 16:00 16:00-18:30 18:30 18:30-19:00 19:00 19:00-22:00 22:00 22:00-02:30 02:30 02:30-04:00 04:00 04:00-06:00 04:00-04:30 04:30 04:30-06:00 06:00-15:30 1-1/2 hr 1-1/2 hr 3-1/2 hr 2hr 1-1/2 hr 18-1/2 hr lhr 3-1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 3hr 4-1/2 hr 1-1/2 hr 2hr 1/2 hr 1-1/2 hr 9-1/2 hr Pulled out of hole to 9000.0 ft Cccontinue POH w/BHA #1. Pulled out of hole to 9000.0 ft POOH. Static losses @ 10 BPH. BHA run no. 1 (cont...) Pulled out of hole to 405.0 ft (cont...) POOH. Static losses @ 10 BPH. AtBHA Pulled BHA Recovered 6.6' K-anchor latch and cut stub. BHA Stood back BHA run no. 2 Made up BHA no. 2 Clear rig floor, make up mill BHA #2. BHA no. 2 made up R.I.H. to 9740.0 ft Stopped: To service drilling equipment Serviced Block line Service top drive, slip and cut drill line. Line slipped and cut R.I.H. to 10150.0 ft At Top of packer: 10150.0 ft Milled Permanent packer at 10150.0 ft PUW 196, SOW 151, RW 175. Record pressures and rates, Mill packer. Completed operations R.I.H. to 10484.0 ft Monitor well, push packer/tailpipe fish to PBTD. Top of fish: 10,484'. On bottom Circulated at 10484.0 ft Break circulation, observe flow, shut in well. SIDP = 0, SICP = 50 psi. Circ gas bubble from well through choke at 3 bpm. Influx At surface Pulled out of hole to 465.0 ft SICP = 0, open annular prevertor, observe well static, POH. At BHA Pulled BHA Mill 20% used. Clean cuttings from boot baskets. BHA Laid out BHA run no. 3 Made up BHA no. 3 MU spear catch assembly. BHA no. 3 made up R.I.H. to 5200.0 ft Continue RIH with fishing spear BHA run no. 3 (cont...) Progress Report Facility Pt Mac 2 Well P2-54 Page 4 Rig Nabors 9ES Date 24 April 00 Date/Time 06:00-07:30 07:30 07:30-08:00 08:00 08:00-09:30 09:30 09:30-14:00 14:00 14:00-15:30 15:30 15:30-05:30 15:30-17:00 17:00 17:00-21:00 21:00 21:00-22:00 22:00 22:00-03:30 13 Apr 00 03:30 03:30-05:30 05:30 05:30-06:00 05:30-06:00 06:00-13:00 06:00-13:00 13:00 13:00-06:00 13:00-15:30 Duration 1-1/2 hr 1-1/2 hr 4-1/2 hr 1-1/2 hr 14hr 1-1/2 hr 4hr lhr 5-1/2 hr 2hr 1/2 hr 1/2 hr 7hr 7hr 17hr 2-1/2 hr Activity R.I.H. to 10400.0 ft (cont...) Continue RIH with fishing spear At Top of fish: 10484.0 ft Fished at 10484.0 ft Break circ. w/47 spm. @ 310 psi. PU 196 K. SO 153 K. Wash down and latch fissh. PU with 215 K. Fish came free Circulated at 10484.0 ft CBU at 88 SPM & 1034 psi. Flow check 15 min. Well Static Obtained bottoms up (100% annulus volume) Pulled out of hole to 10484.0 ft POOH with fish. Monitor well at top of DC. Well Static. Fish at surface Laid down fish Stand back DC. Release spear and LD packer and tail pipe Complete fish recovered BHA run no. 4 Made up BHA no. 4 Clear floor and pick up tools for junk basket/scraper run. MU BHA #4 and DC. BHA no. 4 made up R.I.H. to 10551.0 ft RIH to top of junk. On bottom Washed to 10581.0 ft Wash over junk from 10551 to 10571'. Wash sand to 10581 ft. At Top of fill: 10581.0 ft Pulled out of hole to 366.0 ft Pump slug and POOH standing back 5000 ft. of 4" DP. LD 5500' singles. At BHA Pulled BHA LD BHA # 4. Recover 6# broken slips and packerbands from RCJB and 12 # smaller junk from boot baskets. packer. Completed operations Electric wireline work Rigged up sub-surface equipment - Downhole measurement tools RU Schlumberger for USIT Electric wireline work Conducted electric cable operations RU Schlumberger for USIT log. RIH to 8000 ft. log in combination mode at 6000 fph from 8000 ft. to 200ft. RIH to 4700 ft. and log from 4700 ft. to 3700 ft. in corosion mode at 1400 fph. POOH and RD wireline. Completed logging run with Acoustic log from 8000.0 ft to 200.0 ft Perform integrity test R.I.H. to 4000.0 ft BTT *T~r'I*'~F'O --~1 ..... ~xT'~ ---A BTTT .~ .tnnn c, )00 Progress Report Facility Pt Mac 2 Well P2-54 Page 5 Rig Nabors 9ES Date 24 April 00 Date/Time 15:30 15:30-20:30 20:30 20:30-03:00 14Apr 00 03:00 03:00-04:30 04:30 04:30-04:45 04:45 04:45-05:00 05:00 05:00-05:30 05:30 05:30-05:45 05:45 05:45-06:00 06:00 06:00-13:00 06:00-10:00 10:00 10:00-13:00 13:00 13:00-15:30 13:00-15:30 15:30 15:30-05:30 15:30-16:00 16:00 16:00-22:30 Duration 5hr 6-1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 1/4 hr 7hr 4hr 3hr 2-1/2 hr 2-1/2 hr 14 hr 1/2 hr 6-1/2 hr At Setting depth · 4000.0 ft Tested Casing MAY 22000 Set RTTS at 4000 ft. Close annular preventer and test casing above to to 3000 psi. for 5 min. with no leak off. Bleed pressure, open annular and unseat R~S. Continue in hole and repeat test at 45]0, 5042, 5322, 5602 ft. NO leak. Suspended pressure test on Casing, observed leak R.I.H. to 10100.0 ff Load and strap single DP into pipe shed. P/U singles and ~. At Setting depth' 10100.0 ft Tested Casing Set R~S at 10100 ~. and test casing to to 230 psi . leaked off. Unseat and pull to ]0070 and retest. Leaked off. Test DP side with 1500 psi. Lost 75 psi in 5 ~n. Unseat and monitor well. Suspended pressure test on Casing, observed leak Pulled out of hole to 9145.0 fl POOH to 9145 ft. At Setting depth · 9145.0 ft Tested Casing Test to 165 psi in 20 stks, bled to 0 in 3 minutes, Suspended pressure test on Casing, observed leak Pulled out of hole to 8213.0 ft At Setting depth' 8213.0 ft Tested Casing Pressure to 250 psi in 30 stks, bled to 0 in 3 ~nutes. Suspended pressure test on Casing, observed leak Pulled out of hole to 7750.0 fl At Setting depth' 7750.0 h Peffo~ inte~ity test (cont...) Tested Casing POOH &om 7746' to 6813' and test.. No leak. RIH and test at 7281'. Leaked off. POOH and test at 7188'. NO leak. Tested casing above 7188' to 3000 psi for 30 ~n. Lost 100 psi. Pressure test completed successfully - 3000.000 psi Pulled out of hole to 7188.0 ~ POOH and LD R~S. All packer rubber intact. Clear floor. At B~ Test well consol equipment ~gged up Bottom ram Pull ~ abd run Test plug. Change bottom rams to 3 1/2 x 6 "VBR and test to 3500 PSI. Puli TP and set ~. Work completed - Bottom ram in position Run Liner, 5-1/2in O.D. ~gged up Casing handling equipment Work completed - Handling equipment in position Ran Liner to 10555.0 h (5-1/2in OD) Progress Report Facility Pt Mac 2 Well P2-54 Page 6 Rig Nabors 9ES Date 24 April 00 Date/Time 22:30 22:30-23:00 23:00 23:00-03:30 15Apr 00 03:30 03:30-05:30 05:30 05:30-06:00 05:30-06:00 06:00-08:30 06:00-06:30 06:30 06:30-06:45 06:45 06:45-07:15 07:15 07:15-07:30 07:30 07:30-07:45 07:45 07:45-08:30 08:30 08:30-14:00 08:30-10:00 10:00 10:00-11:00 11:00 11:00-14:00 Duration 1/2 hr 4-1/2 hr 2hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/4 hr 1/4 hr 1/4 hr 3/4 hr 5-1/2 hr 1-1/2 hr lhr 3hr Activity 17 #, L-80 M-BTS At Top of liner · 4855.0 ft Circulated at 4935.0 ft Circ. liner volume. 112 bbl. at 83 spm. & 360 psi. PU -- 109 K, SO = 100 K. Hole displaced with Brine - 45.00 % displaced Ran Liner in stands to 10566.0 ft RIH on DP. Tag sand at 10566'. On bottom Circulated at 10555.0 ft PU to 10555'. MU cementing head. Break circ. 17 spm @ 60 psi. Pump 20 bbl. LCM pill w/2.5 ppb N-vis, 10 ppb OM seal, and 5 ppb Barofiber. Displace 250 bbl at 70 spm and 500 psi. and circ. past liner top. 20.000 bbl LCM pill spotted downhole, LCM content 15.0 lb/bbl Cement · Liner cement Held safety meeting Liner cementing and packer setting safty and operational meeting. Cement' Liner cement (cont...) Tested High pressure lines Pumped 5 bbl water spacer. Tested lines to 5000 psi. Pumped 5 aditional bbl. water Pressure test completed successfully - 5000.000 psi Mixed and pumped slurry - 92.200 bbl Mixed 14.0 ppg class G Released Dart Displaced slurry - 169.900 bbl Displaced with 9.8 ppg brine. Recriprocated liner until 20 bbl cement past shoe. Set liner at 10556' and comtinued displacement. Did not see dart latch. Bumped plug at calculated displacement. Plug bumped Functioned Hanger assembly Set liner hanger with 3000 psi. Equipment work completed Functioned Packer assembly Release pressure and check floats. Weight check liner hang off w/50 K slack off. Set packer with 4250 psi. Equipment work completed Circulated at 5712.0 ft Unseat running tool and circulate bottoms up. Recovered -25 bbl lightly cement cut brine. Obtained clean returns - 110.00 % hole volume Pull Drillpipe, 4in O.D. Pulled Drillpipe in stands to 4300.0 ft Pulled stands to 4300'. LD cement head Stopped · To service drilling equipment Serviced Block line Cut and slip drilling line. Service topdrive Line slipped and cut Laid down 4000.0 ft of Drillpipe ,,--1 ...... :-- ~1^~ ~1 ..... 12~-~ ' LUUI~, MAY O; Facility Date]Time Pt Mac 2 Duration 14:00 14:00-01:00 11 hr 14:00-15:30 1-1/2 hr 15:30 15:30-01:00 9-1/2 hr 16Apr00 01:00 01:00-02:00 1 hr 01:00-02:00 1 hr 02:00 02:00-06:00 4 hr 02:00-06:00 4 hr 02:00-06:00 4 hr 06:00-19:00 13 hr 06:00-06:30 1/2 hr 06:30 06:30-08:00 1-1/2 hr 08:00 08:00-11:00 3 hr Progress Report 11:00 11:00-17:30 6-1/2 hr Well P2-54 Page 7 Rig Nabors 9ES Date 24 April 00 17:30 17:30-19:00 1-1/2 hr Activity 129 joints laid out BHA run no. 6 Made up BHA no. 6 Make up 4.75" mill on 3 1/8" Navidrill motor. PU 3 1/2" DC and Jars· BHA no. 6 made up R.I.H. to 10293·0 ft Surface test motor. PU 2 3/8" DP and RIH to TOL. Break circ. RIH with 4" stands and tag soft cement at 10293'. PU=145 K. SO=120 K. Circ. at 950 psi @ 34 spm. Circ 20 min. Stopped: To pressure test Perform integrity test Tested Liner Test 5.5 "liner and 7·625 casing to 3000 psi for 30 min. Took 3·25 bbl to reach 3000 psi. Lost 50 psi in 30 min. Pressure test completed successfully - 3000.000 psi BHA run no. 6 Drilled installed equipment - Float collar Drilled thrugh float shoe and soft cement to top of sand at 10566. Drilled installed equipment - Float collar Drill soft cement, landing collar, soft cement, float collar, and soft cement to float shoe. Drilled with 2000 psi. @ 120 gpm. WOB = 2-4 K. RPM = - 150. BHA run no. 6 (cont.·.) Drilled installed equipment - Float collar (cont...) Drill soft cement, landing collar, soft cement, float collar, and soft cement to float shoe· Drilled with 2000 psi. @ 120 gpm. WOB = 2-4 K. RPM = N 150. Completed operations Washed to 10852.0 ft Washed sand to 10666 ft and pumped 20 bbl. N-vis sweep· Washed to 10758 and pumped 20 bbl. N vis sweep · Washed to 10852 ft. Pipe plugged off on connection. Pressure changed from 2000.0 psi to 2800.0 psi in 0.25 hr - String blocked Worked toolstring at 10852.0 ft Worked pipe and pumps to clear string· Pulled 5 stand and work pipe. Pulled 5 more and repeat with no change pulled to 9919 ft. and dropped ball. Attemped tonopen circ. sub. Sub did not shif. Completed operations Pulled out of hole to 225·0 ft POOH· Found circ.sub ball in top box of 2 3/8 ' DP. sitting on top of curdled and floculated N-vis.eck. Continued POOH with sporatic accumulations of N-vis "pudding" in tool joint neck downs and clear brine between· N-vis floculate will sink in brine At BHA Pulled BHA LD drill collars. ,-,~---,r-~ · ,.~.~c~ circ. sub. ~ a x,r_, x.uuliu ~v~utor Progress Report Facility Pt Mac 2 Well P2-54 Page 8 Rig Nabors 9ES Date 24 April 00 Date/Time 19:00 19:00-21:30 19:00-21:30 21:30 21:30-06:00 21:30-22:30 22:30 22:30-05:00 17 Apr 00 05:00 05:00-06:00 05:00-06:00 06:00-01:00 06:00-07:30 07:30 07:30-13:30 13:30 13:30-23:30 23:30 23:30-01:00 18 Apr 00 01:00 01:00-06:00 01:00-03:00 03:00 03:00-06:00 06:00-00:30 06:00-00:30 Duration 2-1/2 hr 2-1/2 hr 8-1/2 hr lhr 6-1/2 hr lhr lhr 19hr 1-1/2 hr 6hr lOhr 1-1/2 hr 5hr 2hr 3hr 18-1/2 hr 18-1/2 hr Activity and bit completely plugged with sand below float. LD BHA Laid out Test well control equipment Tested BOP stack Test BOP 250 psi. / 3500 psi. Witness waived by Tom Maunder, AOGCC. Pressure test completed successfully - 3500.000 psi BHA run no. 7 Made up BHA no. 7 Mill clean out BHA without motor. BHA no. 7 made up R.I.H. to 10555.0 ft Run in hole. Fill DP with 30 bbl. N-vis sweep. At Setting depth: 10555.0 ft Washed to 10900.0 ft Wash to 10900'. Pump N-vis sweeps with heavy sand returns at screens. Pumping 193 gpm at 3300 psi. Washed to 10900.0 ft Wash from 10900 ft. to 11063 ft. w/ 262 gpm @ 3050 psi. Pumped 20 bbl N-vis sweep every connection. BHA run no. 7 (cont...) Washed to 11063.0 ft (cont...) Wash from 10900 ft. to 11063 ft. w/ 262 gpm @ 3050 psi. Pumped 20 bbl N-vis sweep every connection. On bottom Circulated at 11063.0 ft CBU three times. Pumped three 40 bbl N-vis sweeps. Heavy sand returns gradually cleaned up. Recovered pieces of 7 5/8" wiper plug. Spotted 30 bbl. 9.8 ppg Nacl on bottom. Obtained clean returns - 300.00 % hole volume Pulled out of hole to 200.0 ft Pump Dry job and POOHlaying down DP. Pulled wet. POOH to 10500'. Open circ sub and pump dry job #2. POOH to BHA. At BHA Pulled BHA LD BHA. BHA Laid out Run Gas lift completion, 4-1/2in O.D. Rigged up Tubing handling equipment RD drill string handling tools. Clear floor. Rig up tubing handling tools. Held PJSM. Work completed - Tubing handling equipment in position Ran Tubing to 1200.0 ft (3-1/2in OD) Run 3 1/2",9.2 #, 13 Cr. completion.P/U WLEG, XN nipple, 5 jts. NSCT tubing, Baker SABL-3 packer,X nipple, ljt. 3 1/2" FOX tbg., GLM # 1, 18 jts tbg. Continuing to run tubing per plan. Run Gas lift completion, 4-1/2in O.D. (cont...) Ran Tubing to 10701.0 ft (4-1/2in OD) Run 3.5" x 4.5" 13-CR completion: Wleg, XN nip., 5 jts 3.5", 9.2 #, 13-CR NSCT tbg, SABKL-3 pkr, X nip., 5 GLM in 124jt. 3.5", 9.2#, 13-Cr,Fox tbg.,XO 2 GLM and SSSV in142jt. 4.5", 12.6#, 13 Facility Pt Mac 2 Progress Report Well P2-54 Page 9 Rig Nabors 9ES Date 24 April 00 Date/Time 19 Apr 00 00:30 00:30-05:00 00:30-05:00 05:00 05:00-06:00 05:00-06:00 Duration 4-1/2 hr 4-1/2 hr lhr lhr Activity Hanger landed Land w/single control line under pressure, TWC installed in hanger. Nipple down BOP stack Rigged down BOP stack Test TWC and hanger seals via annulus to 500 psi. Change bottom rams to 2 7/8 x 5", Clean sand from BOP body, ND BOP. Work completed, equipment laid out Run Single completion, 4-1/2in O.D. Installed Adapter spool Test SSCV lines and NU adaptor spool. e o i o F' E R k~ iii T .C A T A T D A, T A.._F' L U S R IJ N 9L~ ..... 059 ~fURVE¥ R 0 9~.--~059 ~IJEVEY D FZNAL H~/D~ SF'EEEY~.SLIN 9a--059 ~ESS/TENP L 10670--i086~ '1 9a.--'059 ~HP REC L 10600'"10985 1 94~059 ~R,/CCL L 10050-11010 0~l¢1 1 9z~ .... 059 GET L 70 .... '10970 1 o/+ ._ 0 ~, 9 ~ 6 D 102 a/~ '"" 11 'i 81 ,", H /," D N 1 9a--'"059 ~,h! L 10288---'i 118i 'i 9/~ .... 059 ~RVEY R 0, 9a.-'--059 ~5 D 0'~'1 ii6~a. GCT i 0/+/ i/,,-/96 DA'rE ...... RECVD 05 / i 3 / 9 (')5/,' / 3/ (')9/28/ 09/' 29//9a. 09 / ":' 9 / q ~-~.. .,,. ~. 09/2 St ,/9 x~ 12/06/94 1 2 / 0 6/9 a I 1 / 30/' 9 a I 1/30/9 ,,Ar'e cir'y d'i'tci~ sampJes r'equ~'r'ed? yes ,__~)~And r"e,'~--"',,~:,"? ~,:, ~l~ Was the we'ii eot'ed? yes no Ana iys'i's & descr'~'pt-i:or'~ r'ece'i",/ed? yes Ar'e we J 'i tes't;:s r'equ~ r'ed? yes no Rece'f ved? yes no We J 'J ~'s ~'n comp'J ~'ance I n ~' t ~' a 'i CONHENTS Date: Subject: From: ARCO Alaska Inc. Greater Point McIntyre Engineering December 2, 1994 Transmittal Number ARCO Alaska, Inc. 741 To: Bob Crandall AC)GCC 3001 Porcupine Drive Anchorage, AK 99501 The following Greater Point McIntyre Area data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated: Well Name Data Description Run # Date Run v/tY2-07 ~,~-07 FINAL TAPE: DLL/ZDL/CN/GR LIS (LDW.G) I 5-26-94 Format - FINAL LOG: Borehole Profile ~o. % (~/1. 5-26-94 FINAL LOG: SubSea VD (Multi-sho{'°do,,~, ~'~a' 1~" 5-26-94  P~-07 Directional Survey) ~'~.. :~.,B~,~. P~ FINAL LOG: Z-nensilo§/Comp ~ . ~'~'/o~,~ 5-26-94 ~.~- Neutron/GR/Caliper ~(~')~!)~'" PC. or FINAL LOG: DualLaterolog/GR/SP '~O~ ~x'O10:d~"~;26-94 ~7 FINAL LOG: Formation Multi-Tester/GR ~e~' c:~ 5-27-94 ~i~--~iI a.. P2-24'/ FINAL LOG: Dual GR/EWR-Phase Comp 4/23/94 ":!:i--'.!:I ~)b/ 4/F~rmation Exposure Time (TVD) -'!~i? ~ ,M~-21 FINAL LOG: Dual GR/EWR-Phase Comp 4/23/94 : -'.~~. ~/Formation Exposu;e Time (MD) .. · ~ FINAL LOG: Leak Detection Log and Static I 6-26-94 · ~ Temperature ._/" ~/P2-54 FINAL DISKETTE: CDN with LIS Verification I 5-11-94 ~~, 0 ~Ok Listing (.TIF/~~)t(T,' Company Atlas Wireline Atlas Wireline Atlas Wireline Atlas Wireline Atlas Wireline Atlas Wireline Sperry Sun Sperry Sun Schlumberger Schlumberger Schlumberger Transmittal Number: 741 Page: 1 Well Name ,~ Data Description fl' DTP* (Depth Corrected) ~2-54 ~)/skette: GCT Directional Survey (0' 11164' WB-02 Please Tubing Puncher Record ( 1 n/~6,, Tubing 1 Puncher) · to: s1 eturn Run # 1 Date Run 10/27/94 Company Schlumberger 7/6/94 Schlumberger 10/1/94 Schlumberger GPMA Engr Aide, ATO-462 ARCO Alaska, Inc.. P.O. Box 100360 Anchorage, Alaska 99510-0360 Transmittal Number: 749 Page: 2 SUB- SURFACE DIRECTIONAL ~ UIDANCE ~ ONTINUOUS ~ OOL Company ARCO ALASKA, INC. Well Name P2-54 (551' FNL, 1233' FWL, SEC 14, TWN 12N, RNG 14E) Field/Location POINT HCINTYRE, NORTH SLOPE, ALASKA Job Reference No. 94250 Loqqed By: WEST/JOHNSON Date SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. P2 - $4 POINT MCINTYRE NORTH SLOPE, ALASKA SURVEY DATE' 06-JUL-1994 ENGINEER' T. WEST METHODS OF COMPUTATION TOOL LOCATION: MINIMUM CURVATURE INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH $3 DEG $9 MIN EAST COMPUTATION DATE' 7-JUL-94 PAGE I ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 06-JUL-1994 KELLY BUSHING ELEVATION' 47.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTZCAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 oo 100 O0 200 O0 300 O0 400 oo 500 O0 600 O0 700 oo 800 O0 900 O0 0 oo 100 O0 200 O0 300 O0 399 99 499 99 599 98 699 96 799 88 899 77 -47 O0 53 O0 153 O0 253 O0 352 99 452 99 552 98 652 96 752 88 852 77 0 0 N 0 0 E 0 27 N 83 34 E 0 20 N 84 48 E 0 24 S 84 37 E 0 32 S 87 59 E 0 35 S 84 8 E 0 43 S 74 45 E I 46 S 66 15 E 2 28 S 62 43 E 2 59 S 60 52 E 0 oo 0 17 0 64 I 16 I 83 2 69 3 68 5 65 9 44 14 08 0 O0 000 000 0 O0 0 O0 0 oo o OO 0 O2 o O0 o O1 0 oo N 0 03 N 0 14 N 0 llN 0 07 N 0 02 S 0 22 S 0 95 S 2 68 S 4 89 S 0 O0 E 0 23 E 0 89 E 1 51 E 2 31 E 3 31E 4 39 E 6 29 E 9 72 E 13 85 E 0.00 N 0 0 E 0 23 N 83 19 E 0 90 N 81 7 E 1 52 N 85 56 E 2 31 N 88 21E 3 31 S 89 34 E 4 40 S 87 6 E 6.36 S 81 23 E 10.09 S 74 36 E 14.69 S 70 34 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 999 57 O0 1099 O0 1198 O0 1297 O0 1397 O0 1495 O0 1594 O0 1692 952.57 4 17 S 56 7 E 22 1052.22 5 9 S 53 1 E 75 1151.75 6 23 S 48 43 E 95 1250.95 7 44 S 44 40 E O1 1350.01 8 3 S 44 26 E 88 1448.88 9 32 S 49 35 E 24 1547.24 10 58 S 53 8 E 40 1645.40 11 2 S 52 47 E S 51 23 E S 50 40 E O0 1790 57 1743.57 11 1 O0 1888 70 1841.70 11 10 20 35 28 71 38 43 50 85 64 37 79 19 97 18 116 30 135 34 154 55 o Ol 0 O0 0 O3 0 oo 0 oo 0 O2 0 oo 0 O0 0 O0 0 O0 8 20 S 13 09 S 19 16 S 27 88 S 37 65 S 47 99 S 59 10 S 70 56 S 82 94 19 19 E 25 33 42 52 63 77 92 33 S 107 42 S 122 20 87 S 66 51E 98 E 29 59 E 38 60 E 50 21E 64 03 E 79 18 E 97 48 E 116 48 E 135 44 E 154 O9 S 63 16 E 67 S 60 18 E 91 S 56 48 E 37 S 54 12 E 21 S 52 43 E 21 S 52 34 E 33 S 52 39 E 39 S 52 33 E 61 S 52 22 E 2000 O0 1986 77 1939 77 11 23 2100 2200 2300 2400 2500 2600 2700 2800 2900 O0 2084 76 2037 O0 2182.62 2135 O0 2279.53 2232 O0 2375.53 2328 O0 2471.20 2424 O0 2565.85 2518 O0 2659.54 2612 O0 2752.92 2705 O0 2845.94 2798 76 11 37 62 12 25 53 15 45 53 16 32 20 17 38 85 19 55 54 20 46 92 21 11 94 22 7 S 49 31 E S 49 12 E S 49 49 E S 54 38 E S 56 2O E S 56 28 E S 57 22 E S 57 32 E S 56 48 E S 56 46 E 174 06 193 93 214 42 239 04 267 O1 296 09 328 29 363 16 398 90 435 56 0 oo 0 oo 0 O3 0 o2 0 oo 0 O3 0 O2 0 oo 0 01 0 O2 106 96 S 137 44 E 174 15 S 52 7 E 119 133 148 164 180 197 216 235 256 94 S 152 36 S 168 35 S 187 06 S 210 18 S 235 84 S 262 58 S 291 98 S 321 09 S 352 57 E 194 14 E 214 68 E 239 83 E 267 07 E 296 05 E 328 54 E 363 61E 398 32 E 435 07 S 51 50 E 61 S 51 35 E 23 S 51 41E 15 S 52 7 E 18 S 52 32 E 35 S 52 57 E 18 S 53 24 E 90 S 53 44 E 56 S 53 59 E 3000 O0 2937 94 2890 94 24 3 3100 3200 3300 3400 350O 3600 37OO 3800 3900 O0 3028 O0 3117 O0 3204 O0 3289 O0 3374 O0 3456 O0 3537 O0 3615 O0 3690 39 2981 15 3070 45 3157 73 3242 07 3327 95 3409 35 3490 10 3568 50 3643 39 26 37 15 27 57 45 30 26 73 32 8 07 32 56 95 35 0 35 37 50 10 40 12 50 41 29 S 57 2 E S 57 1E S 56 19 E S 55 38 E S 55 44 E S 55 4O E S 56 12 E S 57 8 E S 57 36 E S 57 54 E 474 69 517 24 563 25 611 97 664 17 717 87 773 79 833 16 895 93 961 46 0 02 0 O2 0 01 0 02 0 01 0 02 0 02 0 O2 0 03 0 O0 277 52 S 385 12 E 474 70 S 54 13 E 3OO 325 353 382 413 444 477 510 545 66 S 420 97 S 459 32 S 499 74 S 542 03 S 587 41S 633 O5 S 683 96 S 736 97 S 791 91E 517 39 E 563 74 E 612 88 E 664 25 E 717 58 E 773 25 E 833 20 E 896 77 E 961 26 S 54 28 E 29 S 54 38 E 02 S 54 44 E 24 S 54 49 E 95 S 54 53 E 9O S 54 57 E 31 S 55 5 E 14 S 55 14 E 76 S 55 25 E COMPUTATION DATE' 7-JUL-94 PAGE 2 ARCO ALASKA, INC. P2 - 54 POINT MCZNTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 06-JUL-1994 KELLY BUSHING ELEVATION' 47.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MZN 4000 O0 3765 93 3718 93 40 49 4100 O0 3841 4200 O0 3914 4300 O0 3987 4400 O0 4061 4500 O0 4135 4600 O0 4209 4700 O0 4283 4800 O0 4357 4900 O0 4431 03 3794 55 3867 61 3940 16 4014 06 4088 18 4162 26 4236 59 4310 76 4384 03 42 3 55 43 10 61 42 50 16 42 27 06 42 15 18 42 9 26 41 58 59 42 2 76 42 8 S 57 16 E 1026 98 S 58 37 E 1092 S 58 44 E 1160 S 58 22 E 1228 S 57 52 E 1296 S 57 42 E 1363 S 57 33 E 1430 S 57 29 E 1497 S 57 33 E 1564 S 57 25 E 1631 88 42 48 O6 28 27 32 10 04 o Ol 0 O1 0 O1 0 O1 0 O1 0 O0 0 O0 0 O1 0 O0 0 O1 581 10 S 847 24 E 1027.37 S 55 33 E 616 651 687 723 758 794 831 867 9O3 43 S 903 62 S 960 23 S 1019 03 S 1076 97 S 1133 91S 1190 04 S 1247 Ol S 1303 03 S 1360 02 E 1093.36 S 55 41 E 94 E 1161.04 S 55 52 E 20 E 1229.25 S 56 1 E 73 E 1296.96 S 56 7 E 71E 1364.30 S 56 12 E 40 E 1431.41 S 56 16 E 03 E 1498.57 S 56 19 E 44 E 1565.46 S 56 22 E 02 E 1632.52 S 56 25 E 5000 O0 4505 96 4458 96 42 3 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 4580 O0 4654 O0 4729 O0 4803 O0 4877 O0 4952 O0 5026 O0 5100 O0 5174 24 4533 64 4607 01 4682 46 4756 85 4830 08 4905 32 4979 61 5053 99 5127 24 42 3 64 41 52 01 41 53 46 41 54 85 41 59 O8 42 4 32 42 0 61 42 5 99 41 47 S 57 32 E 1697 96 S 57 44 E 1764 S 57 7 E 1831 S 56 56 E 1898 S 56 44 E 1964 S 56 10 E 2031 S 55 40 E 2098 S 55 12 E 2165 S 54 31E 2232 S 54 7 E 2299 77 47 22 90 66 65 62 55 39 0 O0 000 0 O1 0 oo 0 O0 0 O1 0 O1 0 O0 0 O0 0 oo 939 15 S 1416 50 E 1699 55 S 56 27 E 974 1010 1047 1083 1120 1158 1196 1234 1273 94 S 1473 89 S 1529 29 S 1585 77 S 1641 69 S 1697 30 S 1752 29 S 1807 82 S 1862 84 S 1916 08 E 1766 41E 1833 47 E 1900 38 E 1966 08 E 2033 56 E 2100 74 E 2167 47 E 2234 74 E 2301 49 S 56 30 E 30 S 56 32 E 14 S 56 33 E 90 S 56 34 E 73 S 56 34 E 74 S 56 32 E 72 S 56 3O E 63 S 56 27 E 43 S 56 24 E 6000 O0 5249 52 5202 52 41 51 6100 O0 5323 6200 O0 5396 6300 O0 5470 6400 O0 5543 6500 O0 5616 6600 O0 5690 6700 O0 5763 6800.00 5836 6900.00 5909 51 5276 84 5349 08 5423 32 54.96 64 5569 O0 5643 23 5716 47 5789 79 5862 51 42 46 84 42 53 08 42 56 32 42 54 64 42 48 O0 42 51 23 42 53 47 42 49 79 42 55 S 54 10 E 2366 06 S 52 16 E 2433 S 51 41E 2501 S 51 8 E 2569 S 50 28 E 2637 S 49 53 E 2705 S 49 45 E 2772 S 49 18 E 2840 S 49 4 E 29O8 S 48 34 E 2976 32 27 29 27 11 90 78 63 35 o Ol 0 O1 0 O0 0 01 0 O1 0 O0 0 O1 0 O0 0 O0 0 O0 1312 95 S 1970 73 E 2368 04 S 56 20 E 1353 1395 1437 1480 1524 1568 1612 1656 1701 28 S 2024 19 S 2078 66 S 2131 69 S 2184 26 S 2236 08 S 2288 33 S 234O 81S 2391 63 S 2442 57 E 2435 12 E 2503 33 E 257O 10 E 2638 30 E 2706 24 E 2773 O0 E 2841 56 E 2909 7O E 2976 21 S 56 14 E 02 S 56 7 E 88 S 56 0 E 70 S 55 52 E 37 S 55 43 E 97 S 55 35 E 69 S 55 26 E 39 S 55 17 E 96 S 55 8 E 7000 O0 5982 93 5935 93 43 9 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 6055 O0 6129 O0 62O2 O0 6277 O0 6351 O0 6426 O0 6502 O0 6577 O0 6653 97 6008 97 42 40 50 6082 50 42 59 87 6155 87 42 12 22 6230 22 41 57 83 6304 83 41 26 79 6379.79 41 22 O1 6455.01 41 7 56 6530.56 40 46 85 6606.85 40 8 S 48 8 E 3O44 22 S 48 22 E 3112 S 48 6 E 3179 S 49 5 E 3247 S 49 28 E 3313 S 51 17 E 3380 S 51 14 E 3446 S 50 58 E 3512 S 51 3 E 3577 S 55 5 E 3642 18 61 21 87 30 41 23 65 28 0 O0 0 O1 0 O1 0 02 0 O0 0 O1 0 O0 0 O0 0 O2 0 O2 1746 98 S 2493 63 E 3044 69 S 54 59 E 1792 1837 1882 1926 1969 2010 2051 2093 2131 51S 2544 62 S 2595 87 S 2643 40 S 2696 10 S 2747 42 S 2799 82 S 2850 18 S 2901 54 E 3112 12 E 3179 81E 3247 57 E 3313 65 E 3380 36 E 3446 62 E 3512 44 E 3577 86 S 2953.22 E 3642 52 S 54 5O E 86 S 54 42 E 38 S 54 34 E 99 S 54 28 E 38 S 54 22 E 47 S 54 19 E 27 S 54 15 E 68 S 54 12 E 3O S 54 11E ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 7-JUL-94 PAGE 3 DATE OF SURVEY: 06-JUL-1994 KELLY BUSHING ELEVATION: 47.00 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 6729 73 6682 73 41 7 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 6804 O0 6878 O0 6953 O0 7027 O0 7101 O0 7174 O0 7247 O0 7321 O0 7395 33 6757 72 6831 19 6906 68 6980 54 7054 61 7127 90 7200 44 7274 31 7348 33 42 1 72 41 52 19 41 53 68 41 49 54 42 50 61 43 5 90 42 46 44 42 38 31 42 14 S 55 42 E 3707 38 S 57 28 E 3773 S 57 8 E 3840 S 56 47 E 3907 S 56 39 E 3973 S 55 55 E 4041 S 54 56 E 4109 S 54 37 E 4177 S 54 35 E 4245 S 54 23 E 4312 88 6O 25 89 25 49 52 29 68 o 02 0 O1 0 O0 0 O0 0 O1 o O1 0 O1 0 O0 0 O0 0 O0 2168 99 S 3006 72 E 3707 41 S 54 12 E 2205 2241 2277 2314 2351 2390 2429 2469 2508 30 S 3062 40 S 3118 79 S 3174 36 S 3230 73 S 3286 53 S 3342 82 S 3398 13 S 3453 32 S 35O8 54 E 3773 78 E 3840 73 E 3907 54 E 3973 64 E 4041 80 E 4109 34 E 4177 55 E 4245 38 E 4312 92 S 54 15 E 66 S 54 18 E 33 S 54 20 E 99 S 54 23 E 36 S 54 25 E 62 S 54 26 E 65 S 54 26 E 42 S 54 26 E 82 S 54. 26 E 9000 O0 7469 42 7422 42 42 5 9100 O0 7543 9200 O0 7618 9300 O0 7693 9400 O0 7768 9500 O0 7844 9600 O0 7918 9700 O0 7992 9800 O0 8066 9900 O0 8141 77 7496 35 7571 20 7646 44 7721 03 7797 70 7871 80 7945 97 8019 32 8094 77 41 54 35 41 44 20 41 13 44 40 58 03 41 7 70 42 8 80 42 11 97 41 59 32 41 48 10000 O0 8216 12 8169 12 41 28 10100 O0 8291 10200 O0 8366 10300 O0 8442 10400 O0 8518 10500 O0 8595 10600 O0 8672 10700 O0 8750 10800 O0 8830 10900 20 8244 63 8319 50 8395 91 8471 67 8548 98 8625 60 8703 15 8783 O0 8911 45 8864 20 41 21 63 40 54 50 40 15 91 39 58 67 39 43 98 39 8 60 38 52 15 35 55 45 35 19 11000.00 8993 30 8946.30 34 55 11100.00 9075 31 9028.31 34 55 11164.00 9127 79 9080.79 34 55 S 54 37 E 4379 82 S 54 34 E 4446 S 54 17 E 4513 S 54 1E 4579 S 53 43 E 4645 S 53 26 E 4710 S 53 11E 4777 S 52 33 E 4844 S 52 20 E 4911 S 51 52 E 4978 69 3O 62 49 95 46 59 65 48 S 52 1E 5044 81 S 52 7 E 5110 S 52 4 E 5176 S 52 1E 5241 S 51 56 E 5306 S 51 51E 5370 S 51 54 E 5433 S 52 2 E 5496 S 49 4 E 5556 S 49 17 E 5614 83 44 55 O3 07 46 47 93 93 S 49 48 E 5672.19 S 49 48 E 5729.27 S 49 48 E 5765.80 0 O0 0 O0 0 O0 00l o Ol 0 O2 0 O1 0 O0 0 O1 0 O1 0 O0 0 O1 0 O1 0 O2 0 O1 0 O1 0 O0 0 O2 0 O1 0 O1 O. O0 0.00 O. O0 2547 31S 3563 04 E 4379 96 S 54 26 E 2586 06 S 3617 2624 83 S 3671 2663 68 S 3725 2702 50 S 3778 2741 37 S 3831 2781 17 S 3884 2821 72 S 3938 2862 59 S 3991 2903 62 S 4044 53 E 4446 71E 4513 46 E 4579 68 E 4645 35 E 4711 63 E 4777 16 E 4844 36 E 4911 15 E 4978 83 S 54 26 E 45 S 54 26 E 76 S 54 26 E 63 S 54 26 E O9 S 54 25 E 58 S 54 24 E 71 S 54 23 E 75 S 54 21E 57 S 54 19 E 2944 55 S 4096 41E 5044 89 S 54 17 E 2985.17 S 4148 3025.54 S 4200 3065 54 S 4251 3105 28 S 4302 3144 88 S 4352 3184 04 S 4402 3222 81S 4452 3261 26 S 4499 3299 52 S 4543 49 E 5110 26 E 5176 68 E 5241 50 E 5306 89 E 5370 79 E 5433 50 E 5496 31E 5556 19 E 5614 89 S 54 16 E 49 S 54 14 E 59 S 54 12 E 06 S 54 11E O9 S 54 9 E 48 S 54 8 E 48 S 54 6 E 94 S 54 4 E 93 S 54 1E 3336.70 S 4586.95 E 5672.19 S 53 58 E 3373.65 S 4630.66 E 5729.27 S 53 55 E 3397.29 S 4658.64 E 5765.81 S 53 54 E ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 7-JUL-94 TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0 O0 O0 999 O0 1986 O0 2937 O0 3765 O0 4505 O0 5249 O0 5982 O0 6729 O0 7469 PAGE 4 DATE OF SURVEY: 06-JUL-1994 KELLY BUSHING ELEVATION: 47.00 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPAR.TURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 9oo0 N 0 0 E S 56 7 E 20 S 49 31E 174 S 57 2 E 474 S 57 16 E 1026 S 57 32 E 1697 S 54 10 E 2366 S 48 8 E 3044 S 55 42 E 3707 S 54 37 E 4379 0 0 57 4 17 77 11 23 94 24 3 93 40 49 96 42 3 52 41 51 93 43 9 73 41 7 42 42 5 -47 O0 57 952 77 1939 94 2890 93 3718 96 4458 52 5202 93 5935 73 6682 42 7422 0 O0 35 O6 69 98 96 O6 22 38 82 10000.00 8216.12 8169.12 41 28 11000.00 8993.30 8946.30 34 55 11164.00 9127.79 9080.79 34 55 S 52 1 E 5044.81 S 49 48 E 5672.19 S 49 48 E 5765.80 0 O0 0 O1 0 O0 0 O2 0 O1 0 O0 0 O1 0 O0 0 02 0 O0 0 O0 N 8 106 277 581 939 1312 1746 2168 2547 2O S 19 96 S 137 52 S 385 lO S 847 15 S 1416 95 S 1970 98 S 2493 99 S 3006 31S 3563 19 E 20 44 E 174 12 E 474 24 E 1027 50 E 1699 73 E 2368 63 E 3044 72 E 3707 04 E 4379 0 O0 E 0 O0 N 0 0 E 87 S 66 51E 15 S 52 7 E 7O S 54 13 E 37 S 55 33 E 55 S 56 27 E 04 S 56 20 E 69 S 54 59 E 41 S 54 12 E 96 S 54 26 E 0.00 0.00 0.00 2944.55 S 4096.41E 5044.89 S 54 17 E 3336.70 S 4586.95 E 5672.19 S 53 58 E 3397.29 S 4658.64 E 5765.81 S 53 54 E COMPUTATION DATE' 7-JUL-94 PAGE 5 ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 06-JUL-1994 KELLY BUSHING ELEVATION' 47.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 47 O0 147 O0 247 O0 347 01 447 01 547 02 647 03 747 07 847 16 0 oo 47 O0 147 O0 247 O0 347 O0 447 oo 547 O0 647 oo 747 O0 847 oo -47 oo 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 oo 700 oo 800 O0 0 0 N 0 0 E 0 18 N 55 53 E 0 22 N 77 30 E 0 21 S 86 12 E 0 27 S 86 21E 0 35 S 83 S1E 0 38 S 80 11E 1 5 S 69 2 E 2 14 S 63 3 E 2 39 S 61 58 E O. O0 0.00 0.42 0 85 1 46 2 23 3 13 4 38 7 28 11 53 0 oo 0 O0 0 O0 o O0 0 O0 o OO 0 O0 0 O1 0 O1 0 O0 0 oo N 0 O0 N 0 07 N 0 14 N 0 08 N 0 02 N 0 09 S 0 46 S 168 S 3 66 S 0 O0 E 0 O0 E 0 57 E 1 16 E 1 86 E 2 78 E 3 80 E 5 09 E 7 78 E 11 59 E 0 oo N 0 0 E 0 0 1 1 2 3 5 7 12 O0 N 0 0 E 57 N 82 37 E 17 N 83 1E 86 N 87 33 E 78 N 89 30 E 80 S 88 34 E 11 S 84 51E 96 S 77 49 E lB S 72 29 E 947 30 947 O0 1047 58 1047 1147 98 1147 1248 60 1247 1349 50 1347 1450 51 1447 1551 91 1547 1653 75 1647 1755 62 1747 1857 50 1847 O0 1000 O0 1100 O0 1200 O0 1300 O0 1400 O0 1500 O0 1600 O0 1700 O0 1800 900 O0 3 34 O0 4 50 O0 S 29 O0 7 19 O0 7 52 O0 8 28 O0 10 29 O0 11 2 OO 10 S8 O0 11 6 S S8 7 E S 54 16 E S 51 46 E S 45 31E S 44 33 E S 45 33 E S S2 10 E S 53 17 E SSl 39 E S 51 2 E 16 74 24 14 33 13 44 19 57 48 71 51 88 22 107 44 126 89 146 36 0 02 0 O1 0 O1 0 O1 0 O0 0 O1 0 02 0 oo 0 O0 0 O0 6 24 S 10 37 S 15 78 S 23 10 S 32 67 S 42 77 S 53 67 S 65 24 S 77 89 16 16 E 22 29 37 47 57 7O 85 06 S 100 24 S 116 30 E 24 49 E 33 83 E 44 31E 57 31E 71 06 E 88 41E 107 86 E 126 07 E 146 17 32 S 68 53 E 60 S 65 4 E 45 S 61 50 E 33 S 58 35 E 50 S 55 23 E 51 S 53 16 E 25 S 52 33 E 47 S 52 38 E 93 S 52 37 E 41 S 52 27 E 1959 44 1947 O0 1900 O0 11 18 2061 46 2047 2163 2266 2370 2474 2579 2686 2793 2901 57 2147 27 2247 25 2347 65 2447 96 2547 59 2647 65 2747 14 2847 O0 2000 O0 2100 O0 2200 O0 2300 O0 2400 O0 2500 O0 26OO O0 2700 O0 2800 O0 11 31 O0 11 52 O0 14 56 O0 16 26 O0 17 8 O0 19 29 O0 20 43 O0 21 9 O0 22 9 S SO 2 E S 49 23 E S 49 12 E S 53 16 E S 56 17 E S 56 24 E S 57 2 E S 57 32 E S 56 49 E S 56 45 E 166 10 186 23 206 81 230 10 258 57 288 52 321 51 358.42 396.61 435.98 0 O0 0 O0 0 01 0 O4 0 O0 0 01 0 03 0 O0 0 01 O. 02 101 80 S 131 35 E 166 18 S 52 13 E 114 128 143 159 175 194 214 234 256 90 S 146 71E 186 40 S 162 35 E 206 09 S 180 45 E 230 38 S 203 81 E 258 99 S 228 76 E 288 17 S 256 33 E 321 03 S 287.53 E 358 73 S 319.70 E 396 32 S 352.68 E 435 35 S 51 56 E 98 S S1 40 E 30 S 51 35 E 73 S 51 58 E 63 S 52 26 E 57 S 52 51E 44 S 53 20 E 61 S 53 43 E 98 S 53 59 E 3009.91 2947.00 2900 O0 24 16 3120 86 3047.00 3000 O0 27 4 3233 3349 3467 3587 3712 3842 3975 4108 89 3147.00 3100 O0 28 40 67 3247 O0 3200 O0 31 37 81 3347 O0 3300 O0 32 36 87 3447 O0 3400 O0 34 44 23 3547 O0 3500 O0 38 6 07 3647 O0 3600.00 41 4 O0 3747 O0 3700.00 40 46 06 3847 O0 3800.00 42 9 S 57 6 E S 56 51E S SS 58 E S 55 45 E S 55 4O E S 56 7 E S 57 13 E S 57 49 E S 57 27 E 1010 S 58 4O E 1098 478.71 526.65 579.30 637 58 700 46 766 85 840 65 923 29 68 27 O. 03 0 O2 0 03 0 02 0 O1 0 02 0 02 0 O1 0 O1 0 O1 279.71S 388 49 E 478.71 S 54 15 E 305.8O S 428 334.92 S 472 367 77 S 520 403 21S 572 440 54 S 627 481 12 S 689 525 61S 759 572 29 S 833 619 25 S 9O7 80 E 526.67 S 54 30 E 72 E 579.34 S 54 41 E 90 E 637.65 S 54 47 E 87 E 700.54 S 54 52 E 81E 766.96 S 54 57 E 55 E 840.81 S 55 6 E 38 E 923.54 S 55 19 E 49 E 1011.05 S 55 32 E 64 E 1098.76 S 55 42 E COMPUTATION DATE' 7-JUL-94 PAGE 6 ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 06-JUL-1994 KELLY BUSHING ELEVATION' 47.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MZN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4244 48 3947 O0 3900 O0 43 6 4380 4516 4651 4785 4920 5O55 5189 5324 5458 79 4047 12 4147 05 4247 74 4347 55 4447 25 4547 75 4647 16 4747 51 4847 O0 4000 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 O0 4700 O0 4800 O0 42 36 O0 42 13 O0 42 19 O0 42 3 O0 42 6 O0 42 1 O0 41 50 O0 41 53 O0 41 56 S 58 36 E 1190 74 S 57 59 E 1283 S 57 40 E 1374 S 57 27 E 1464 S 57 31E 1554 S 57 21E 1644 S 57 44 E 1734 S 57 9 E 1824 S 56 56 E 1914 S 56 26 E 2003 12 O9 51 57 8O 87 64 33 95 o O1 0 O1 0 O0 0 O1 0 O0 o O0 0 O0 0 O0 0 O0 0 oo 667 44 S 986 93 E 1191 43 S 55 56 E 716 764 813 861 910 958 1007 1086 1105 14 S 1065 76 S 1142 35 S 1219 88 S 1295 46 S 1371 94 S 1447 17 S 1523 09 S 1598 30 S 1674 73 E 1284 86 E 1375 32 E 1465 39 E 1555 63 E 1646 74 E 1736 66 E 1826 99 E 1916 O1E 2005 O0 S 56 6 E 13 S 56 13 E 70 S 56 18 E 91 S 56 22 E 30 S 56 25 E 52 S 56 29 E 45 S 56 32 E 27 S 56 33 E 99 S 56 34 E 5593 16 4947 O0 4900 O0 42 5 5727 5862 5996 6132 6268 6405 6541 6677 6814 82 5047 44 5147 61 5247 02 5347 48 5447 O2 5547 38 5647 84 5747 35 5847 O0 5000 O0 5100 O0 5200 O0 5300 O0 5400 O0 5500 O0 5600 O0 5700 O0 5800 O0 41 58 O0 41 54 O0 41 51 O0 42 5O O0 42 57 O0 42 53 O0 42 48 O0 42 55 O0 42 48 S 55 42 E 2094 07 S 55 1E 2184 23 S 54 14 E 2274 34 S 54 9 E 2363 80 S 52 3 E 2455 O6 S 51 19 E 2547 S 50 26 E 2640 S 49 53 E 2733 S 49 2O E 2825 S 48 59 E 2918 84 68 15 74 35 00l o O0 0 O1 0 O1 0 O0 o O1 0 O1 0 O0 o oo o O0 1155 71S 1748 77 E 2096.16 S 56 32 E 1206 1259 1311 1366 1424 1482 1542 1602 1663 94 S 1823 18 S 1896 63 S 1968 63 S 2041 21S 2114 87 S 2186 38 S 2257 50 S 2328 21S 2398 O0 E 2186.33 S 56 30 E 43 E 2276.40 S 56 25 E 90 E 2365 79 S 56 20 E 75 E 2456 91 S 56 12 E 59 E 2549 48 S 56 2 E 73 E 2642 10 S 55 51E 79 E 2734 33 S 55 40 E 56 E 2826 69 S 55 28 E 91 E 2919 08 S 55 16 E 6950 83 5947 O0 5900 O0 42 59 7087 7223 7359 7493 7626 7759 7891 8022 8157 79 6047 93 6147 37 6247 56 6347 91 6447 63 6547 05 6647 99 6747 40 6847 O0 6000 O0 6100 O0 6200 O0 6300 O0 6400 O0 6500 O0 6600 O0 6700 O0 6800 O0 42 48 O0 42 59 O0 41 56 O0 41 26 O0 41 17 O0 40 52 O0 40 2 O0 41 30 O0 41 56 S 48 19 E 3010 82 S 48 19 E 3103 S 47 58 E 3195 S 49 26 E 3286 S 51 12 E 3376 S 51 8 E 3464 S 50 47 E 3551 S 54 58 E 3636 S 56 28 E 3722 S 57 18 E 3812 93 84 8O 04 16 30 52 55 2O 0 O0 0 O2 0 O1 0 O0 0 O1 0 O0 0 O1 0 02 0 O3 0 O1 1724 60 S 2468 60 E 3011 35 S 55 4 E 1787 1848 1908 1966 2021 2076 2128 2177 2225 O1S 2538 53 S 2607 74 S 2675 44 S 2744 56 S 2813 51S 2880 55 S 2948 46 S 3019 99 S 3094 35 E 3104 25 E 3196 93 E 3286 33 E 3376 20 E 3464 98 E 3551 50 E 3636 32 E 3722 88 E 3812 29 S 54 51E 06 S 54 4O E 93 S 54 3O E 12 S 54 23 E 21 S 54 18 E 33 S 54 13 E 54 S 54 10 E 58 S 54 12 E 25 S 54 16 E 8291 69 6947 O0 6900.00 41 53 8425 8562 8698 8834 8969 9104 9238 9371 9503 98 7047 16 7147 77 7247 70 7347 77 7447 33 7547 40 7647 56 7747 94 7847 O0 7000.00 42 5 O0 7100.00 43 9 O0 7200.00 42 46 O0 7300.00 42 26 O0 7400.00 42 9 O0 7500.00 41 54 O0 7600.00 41 41 O0 7700.00 41 13 O0 7800,00 41 10 S 56 47 E 3901.71 S 56 31 E 3991 24 S 55 13 E 4083 S 54 38 E 4176 S 54 29 E 4268 S 54 34 E 4359 S 54 34 E 4449 S 54 9 E 4538 S 53 54 E 4626 S 53 24 E 4713 63 68 74 54 58 86 81 55 0 O0 0 O2 0 O1 0 O0 0 O1 0 O0 0 O0 0 O1 0 O1 0 O1 2274.75 S 3170 09 E 3901.78 S 54 20 E 2323.92 S 3245 2375 72 S 3321 2429 34 S 3397 2482 74 S 3472 2535 56 S 3546 2587 74 S 3619 2639 78 S 3692 2691 46 S 3763 2742 91S 3833 03 E 3991.34 S 54 24 E 59 E 4083.75 S 54 26 E 65 E 4176.81 S 54 26 E 65 E 4268.88 S 54 26 E 51 E 4359.68 S 54 26 E 89 E 4449.72 S 54 26 E 44 E 4539.01 S 54 26 E 60 E 4626.95 S 54 26 E 44 E 4713.68 S 54 25 E COMPUTATION DATE: 7-JUL-94 PAGE 7 ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 06-JUL-1994 KELLY BUSHING ELEVATION: 47.00 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MZN 9638 19 7947 O0 7900 O0 42 14 9773 9907 10041 10174 10305 10436 10566 10695 10820 13 8047 61 8147 15 8247 07 8347 89 8447 63 8547 48 8647 37 8747 79 8847 O0 8000 O0 8100 O0 8200 O0 8300 O0 8400 O0 8500 O0 8600 O0 87OO O0 8800 O0 42 1 O0 41 46 O0 41 14 O0 40 46 O0 40 11 O0 39 53 O0 39 17 OO 38 58 O0 35 46 S 52 59 E 4803 10 S 52 25 E 4893 68 S 51 52 E 4983 55 S 52 4 E 5071 99 S 52 7 E 5159 51 S 51 59 E 5245 S 51 47 E 5329 S 51 57 E 5412 S 52 5 E 5493 S 48 53 E 5569 35 52 29 57 06 0 O1 0 O1 0 01 0 O1 0 O2 0 02 0 O0 0 O1 0 02 0 O1 2796 58 S 3905 15 E 4803 23 S 54 24 E 2851 2906 2961 3015 3067 3119 3170 3221 3269 61S 3977 75 S 4048 28 S 4117 13 S 4186 88 S 4254 81S 4320 97 S 4386 02 S 4450 25 S 4508 12 E 4893 14 E 4983 84 E 5072 90 E 5159 68 E 5245 98 E 5329 ll E 5412 21E 5493 49 E 5569 79 S 54 22 E 63 S 54 19 E 06 S 54 17 E 56 S 54 14 E 39 S 54 12 E 55 S 54 lO E 31 S 54 8 E 58 S 54 6 E 06 S 54 3 E 10943.51 8947.00 8900.00 35 1 11065.48 9047.00 9000.00 34 55 11164.00 9127.79 9080.79 34 55 S 49 40 E 5639.93 S 49 48 E 5709.56 S 49 48 E 5765.80 0.01 0.00 0.00 3315.81 S 4562.26 E 5639.93 S 53 59 E 3360.90 S 4615.57 E 5709.57 S 53 56 E 3397.29 S 4658.64 E 5765.81 S 53 54 E ARCO ALASKA, INC. P2 - 54 POINT MCZNTYRE NORTH SLOPE, ALASKA MARKER LAST READING GCT TOTAL DEPTH COMPUTATION DATE: 7-JUL-94 INTERPOLATED VALUES FOR CHOSEN HORIZONS DATE OF SURVEY KELLY BUSHING ELEVATION ENQINEER PAGE 8 06-JUL-1994 47.00 FT T. WEST SURFACE LOCATION = 551' FNL ~ 1233~ FWL, SEC14 T12N R14E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 10970.20 8968.88 8921.88 3325.69 S 4573.93 E 11164.00 9127.79 9080.79 3397.29 S 4658.64 E COMPUTATION DATE: ?-JUL-94 PAGE 9 ARCO ALASKA, INC. P2 - 54 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 06-JUL-1994 KELLY BUSHING ELEVATION: 47.00 FT ENGINEER: T. WEST ************ STRATIGRAPHIC SUMMARY ************ MARKER SURFACE LOCATION = 551~ FNL ~ 1233~ FWL, SEC14 T12N R14E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST LAST READING GCT TOTAL DEPTH 10970.20 8968.88 8921.88 3325.69 S 4573.93 E 11164.00 9127.79 9080.79 3397.29 S 4658.64 E FINAL WELL LOCATION AT TO: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 11164.00 9127.79 9080.79 5765.81 S 53 54 E COMPANY ARCO ALASKA, INC. FIELD P2 - 54 WELL POINT MCINTYRE COUNTRY USA RUN ONE DATE LOGGED 06-JUL-1994 REFERENCE 94250 All interpretations are opinions based on inferences from electrical or other measurements and we cannot, and do not guarantee the accuracy or correctness of any nterpretat OhS. and we shall not, except in the case of gross or wilfull negligence on our part. be liable or responsible for any loss. costs, damacles or expenses incurred or sustained by anyone resu ting from any interpretation made by any of our off cars. agents or employees. These interpretations are also subject to our General Terms and Cond dons as set out in our current price Schedule. _ _ HELL: P2- 5'4 (551' FNL, 1233' FWL, .SEC 14"--'..NN 12N, RNG 14E) HORZZONTAL PROdECT~O~ 3000 2O0O 1000 -1000 -2000 -3000 -4000 SOUTH - 5000 SCALE = 1 / 1000 ~N/~'r ~ .... ~ ?'~" '~ ...... ?"~ ..... !"?"!"! .... ?'~"~'i .... ~"T~" ,":"~"~'i '"!'i'? i "T"i'"! ~ '? ;'i' '! ...... !'"~' :"?"! '~ ! ....... ~ ~ ..... i"i'"~ ! ..... i'i'"i'"i ..... i'-i'":'-'~ ...... F'~"T': '"~'":'"~'"~ ..... i'"~'"~ :. "~'":"~"? !"~":'"i" ?'~'''~''':'' ~' ':' :'"!"': ''~'''!''': ............. :"? .... : ~ .......... :": ....... ' ....... :' ' : ' : : ' ~ ~ ~ . .i : i : ! i . . ~ : i : ; : : : : : : ! ' : - : : ' : : i'-i~ !"~. ---'. "."-i'--:: ...... !'-'~-'?'-; ...... k"k-';'-'~ ...... ~" ~--'~'-: ..... ~'"??"~ ~' T'-!'"~ ..... ~"i' '~'"! ...... F-'i'":" ! .... i'-'~'"!'"i ..... !--'k"~'"!'" ~ : : : "~' ''! ...... ' ' ' !'-i ! !' ';'":"i'-i ...... !-"i"i---! ..... !'--i'-'i "i .... i'-i ':'": .... !'"!"i'-i ..... i-'i"i"i .... i"i ;"i- i -i---!-'i'-i- 'i' '!"i "~ ..... !"i'-i'"~ :'"'"'"": ~'"." ': .......... ~ ........ -i ....... i ......... i.-.~...i..-i.-i.-.i-..~.--i-..~ ...... ~ .............................. ~ ...... ~.-., .......... - .............. ~..-~ .............. i--.~ ....... ~-..~--.~ ............ i .............. ~...L.~...i ..... ~ ..... '-..i . .L..~ ............ ...... ~ ...... .... !' ~ 'i'"~'"~."T--!'"'"-r"!'-'F"! ..... :'-'~'"!-'-! ..... ~ ": "~ .......... ?' F";-"-: ...... ~-'-;'"~'"~ ...... F";' '?"~ ..... :-"F": ; '"~'"i--'!TM .... ~'":-"!'"; ...... i" !'"' ': .... :'": ................. : . ' '.' . - ~.--~--.i--; .... ~ .-i---i ....... i-.-i---:---i---~ ---:.---~---~---~ ...... ~.--~-.-; ......... ~---~ ~ ...... ~-- ;---:---~ .... ~---¥.-~ ' ---;---~.--~---~ ...... ~.--~-.-i --.~-.-~---~..-~ ...... ~-.-~...~.-.~ .... ~'--i.. ~ ....... ~' '- ....... : .... ? · :~..ii .: i--+--~ ...... ;;; ......................... L..~ ..... !-i'"!"-: .... i-'?'-'~--'~ ......................... -"~ ......... ' : : !~ . · .................. . : - . : . . . --~"'~ ............. ~..¥..?..~ ................... ~ .............................. : ..... ?.i-- ! .... ~---i--+--i ...... ~---~---i-- i ..... i--!--i-- ~ .... ~---i .......... !---i---! ...... ~--!--.?.-.i · · .! ........ ~ ..... !---~ ~ :- ?--~---~---~ ......... !--.!--.i · -: ...... ~ .- -: ....... : .... : : ~ : ~ : ' ! '. i . :. I ~ ~ ~ : ! i~ ' ' : : ~ - : ~ : ..... · , ; · :.4..;..; .... i..+..i...; ...... :...: ..... ~ ...... ~ ........ ~·~ .: · .~ ~ : :--.-.; ~ ...... : .: ........... ..... . .... :..,~...i ....... ~ ......... : ..: ..... .. ....... ' ;'"!' i ' !-' !'"!'"! ..... !'";'--~-"; ...... :'"?"? ......... ~--: ' :-': '-'~'":' ~ ...... ?'"!"-' ' > .... ~" ;' : :' ':'"? ~ .... :" ~ ":" : ..... ?'"?'":"; ...... . ....... : ....... '" .". ....... ~' . ....... ' .... ':, ~ ~ .... :...i--.i.-!...i--.i...i---! i . :...i...?...~...i i ..... '...i...i...: . i..~..~, i .... ~.:. ..... : ..:..: .... : .... :...;..i.: .... : ~..i ....... ,..:...:..~ ... i.: ............... -.i ~. :: i. ;. ,. L i..:,..L.[...::...i...L./. ..... :....i../....i ..... i..: ~ ....... :... i..: ~ ..... :. ::. i .... :. ...... : ..... :- -:--: - : :-~. -~-. i.-.i ......... ~ -:...:- ...... .... : .... · : :~:~ ':~'i~ i::' : :i: ~::: : : '!:: :i!. ! . . :..:: .... i...L.;...,...I...~.._:....;.._:..i...i...i...i...i. ,.:...L.: ..... :...i..~ ......... :...~..: ......... ~..~. i...~ ......... i..: ......... ~..i ....... : ....... :....: ....... : ........ :~..: ..... '.'. ............ : : . ::: ...... : -! ...... !-'-i'"i ........ ;":': ...... :'6'n'h61 ' ': ............. ! ..... i ': '" !"i' '!': .............................. : i: :: : :: ~ 3,~: 2oot3.,, - .... : !'.i:: :~:: i!:' . i:i ~'s,,:]~ooo:i :: i ii ...... ........ ~'?T": "~"-~-":'" .......... 5': :' -,-,': ' -i-~: -'"'",,j~ '?': - f ; '" ~ i ........ ;"?': ..... :": ' [ i .... ~ ' : ; : ; : .... : .... :':'" : : : : : ' :-: :~i.i.~::: : ; ' ' ' : ' ' ': : ; :': : ' ..i.;...! . . ! i---i---i ...... !.-.i.-.i---i...L-:--.i.-.i..-: :.; ..... i.-i-~ ..... ~-: ----:~--..:~ i.-~ooo-~- .............. ;. ..... ~.--:.--~-: ......... ~ ..... : ::!:.:i.:::::: :::::::::::::::::::::::::::::::::::::::::::::: .-;': .::'i:::;:-: ::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ': :::' '.:'!X :,:o';;::: ....... :"::'":."::::.: ......... : ................... :...:..L ...... i...:...~...: ....... ~ ......... i : .............. : .................................. ~ ........................ : . ..: ................... · : '' ' ] "' ~ ....... ! ...... ! ...... ~ ...... ] ........ ' ............................... I ! 1 -2000 -1000 0 1000 2000 3000 4000 5000 6000 VVE s"'r EAST WELL' P2-54 - (551' FNL, 1233' FI~L, SEC 14, TWI'( 12N, RNG 14E) VERTICAL PROJECTION 306.0 - 1000 0 0 1000 2000 3000 4000 5000 6000 7000 128.0 PROJECTION ON VERTICAL PLANE 306.0 - 1260 SCALED IN VERTICAL DEPTHS HO~IZ SCALE = I / 1000 IN/FT Well Name ~ Data Description  d~,_ Static BHP Survey-Press/Temp/GR/CCL 1 Perforation Record 3-3/8" HSD 4lB H-JII 6 SPF 1 t/P2-23 Static BHP'S~rvey-Press/Temp/GR 1 v ~-, Perforation Record 3- /8 HSD 4lB ~29 Static B~ Su~-Press/ emp/ ,/. Perforation ~~3- /o HSD41B~H6SPF P2-31~ Static Pr~ure Su~ey ~-42 Dual Burst TDT-P Log (Borax ~jection Log) ~~ ~t~-/~w Log (~T-P-GR-CCL) 1 ~-~ ~jection P~le Log (Press-Temp-SP:-GR) 1 P~4 GR:C~ewel~ Log 1 ~4' Sta{ic Pr~ure Su~ey -Press-Temp Please sign ~/// ~~d return to: Run # Date Run 7/24/94 Company Schlumberger 7/18/94 Schlumberger 7/19/94 Schlumberger 7/18/94 Schlumberger 1 7//~& Schlumberger -' I ~~ ,,. Schlumberger I 8/26/94 Schlumberger 9/13/94 Schlumberger 9/13/94 Schlumberger 7/6/94 Schlumberger 7/6/94 Schlumberger 7/21/94 Schlumberger 7/22/94 Schlumberger GPMA Engr Aide, ATO-462 ARCO Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Transmittal Number: 745 Page: 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] StJSPENDED [] ,NgAN~ED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 94-59 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 $0- 029-22470 4. Location of well at surface ~-~-,.~..~..,.._~ .... 9. Unit or Lease Name 551' SNL, 1233' EWL, SEC. 14, T12N, R14E ~~_ , ~':~'~.~. Point Mclntyre At Top Producing Interval ~,~--.~,-~ I ..... :;~,~ .-.. 10. Well Number ' .... '~ .... [' P2-54 3946'SNL, 617'EWL, SEC. 13, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 45.62' I ADL 34624 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 4/29/94 5/10/94 7/22/94I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey IO. Depth where 888V set 121 i Th'c~ness of Permafrost 11180'MD/9145' TVD 11081'MD/9063'-l'VD ~ [] ~ [] 2074' feet MD 750'(Approx.) 22. Type Electric or Other Logs Run GR/NEU/DEN/RES/L WD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110 30" 260 sx Arcticset (Approx.) 10-3/4" 45.5# NT8OLHE 35' 3940' 13-1/2" 1166 sx CS 111/375 sx "G" 7-5/8" 29. 7# L-80/13CR 31' 11164' 9-7/8" 590 sx Class "G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MD) Gun Diameter 3-3/8" 6 spf 4-1/2", 13CR 10254' 10172' MD TVD (ss) 10794'-10824' 8780'-8804' 10844'-11008' 8821 '-8958' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.} 7/24/94 I FIowing Date of Test Hours Tested PROOUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKES IZE IGAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence ot oil, gas or water. Submit core chips. RECEIVED L Aiask~ 0il & Gas Cons. Commission Anch0ra~o Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOC-~ MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea HRZ 10707' 8711' Kalubik 10769' 8760' Kuparuk 10789' 8776' RECEIVED -5 Alaska 0ii & Gas Cons. ~,om_mjscbn 31. LIST OF A'I-I'ACHMENTS Anchora~.~c 32. I hereby certify t.hat the foregoing is true and correct to the best of my knowledge Signed -~~-~~ TitleOrJllJn~_En~_ineerSuoerv[sor Date ~/~'/~ L~- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-54 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 04/29/94 05:00 SPUD: 04/29/94 12:30 RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: NABORS 2ES 04/29/94 ( 1) TD: 110' ( 110) 04/30/94 ( 2) TD: 745' ( 635) 05/01/94 ( 3) TD: 3150' (2405) 05/02/94 ( 4) TD: 3955'( 805) 05/03/94 (5) TD: 4100' ( 145) RU 20" DIVERTER MW: 0.0 VIS: 0 TURNKEY RIG MOVE F/P2-21 T/P2-54. TAKE ON WATER, BUILD CONTAINMENT F/CUTTINGS PIT. SET ON 20" DIVERTER. W/O TRUCKS MW: 8.7 VIS:220 NU DIVERTER & MIX MUD. HELD SFTY MTG. SLIP & CUT DL 59.5' TEST DVRTR W/AOGCC ON LOCATION. OK. PU BHA #1. FILL HOLE & CHK. F/LEAKS. C/O 20" CNDCTR T/ll0'. DRLG 13.5 HOL T/352. CUTTINGS BOX FULL. ALL TRKS LOADED. POOH PU BHA #2 9-5/8" DYNA DRILL & MWD, RIH. DRLG T/582. DUMP VALVE NOT WORKING. POOH CHANGE VALVE & RIH. DRLG T/745. W/O GUZZLERS T/CATCH UP/ALL TRKS FULL. DRILLING MW: 9.2 VIS:130 DRLG T/943. W/O GUZZLERS. DRLG T/2491. CBU. SHORT TRIP T/HWDP. HOLE OK. DRLG T/3150. RUNNING 10.75 CASG MW: 9.3 VlS:120 DRILL T/3950. CBU. SHORT TRIP T/2979. SWABBING. RIH REAM & WASH T/CLEAN OFF BALL. CIRC & COND HOLE. WIPER TRIP T/HWDP. HOLE OK ON TRIP IN. CBU & ROTATE PIPE/RECIP. T/REMOVE BALL. POOH T/BHA. LD BHA & CLEAR FLOOR. RU T/RUN 10.75, 45.5#, NT80LHE BTC CASG. 50 OF 99 JTS RUN BY 6:00AM. DRILLING MW: 8.9 VIS: 33 RUN 10.75 45.5# NT80LHE BTC CASG. 99 JTS TOTAL. SHOE @ 3940. FC @ 3861. LAND CASG. CIRC & RU BJ. PUMP 50 BBLS FRESH WATER AHEAD/TEST LINES T/3000. MIX & PUMP 1166 SX COLD SET @ 12.3 PPG. DROPPED BTTM PLUG/TAIL SLURRY/354 SX "G" @ 15.7PPG. DROP TOP PLUG & KO W/5BBLS WATER, DISPLACED W/366 BBLS MUD. CIP @ 12:10 HRS. ON 5/2/94.BUMP PLUG W/2000. FLOATS HELD OK. FULL CIRC THROUGHOUT JOB. CMT T/SURFACE 20 BB'S. NO TOP JOB. LD LNDG JT. HOLD SFTY MTG. ND DVRTD STCK/INSTALL FMC SSH/ NU BOP & FLOW LINE. 30 MIN. SFTY MTG. TEST BOP 250/5000. WITNESS: B. FOSTER AOGCC. PU BHA #2. ORIENT MWD. RIH T/3860 CBU. TEST 10.75 CASG T/3000 F/30 MIN. OK. DRLG OUT CMT & SHOE @ 3940. DRILL 10' NEW HOLE T/3965. LOT TEST T/EMW 12.PPG. DRILL T/4100. Gas Cons. Commission Anchora,~e WELL : P2-54 OPERATION: RIG : DOYON 14 PAGE: 2 05/04/94 ( 6) TD: 6813' (2713) 05/05/94 ( 7) TD: 7700' ( 887) 05/06/94 (8) TD: 8551' ( 851) 05/07/94 ( 9) TD: 9842' (1291) 05/08/94 (10) TD:10570' ( 728) 05/09/94 (11) TD:10706' ( 136) 05/10/94 (12) TD:lll80' ( 474) 05/11/94 (13) TD:lll80' ( 0) CBU F/BIT TRIP MW: 9.4 VIS: 46 DRLG F/4100 T/4817. CBU F/SHORT TRIP T/10.75" CASG SHOE @3940. HOLE OK. DRLG F/4817 T/5811. CBU F/SHORT TRIP, LIGHT SWABBING IN TIGHT AREAS. DRLG F/5811 T/6811. CBU & CLEAN HOLE F/BIT TRIP. DRILLING MW: 9.3 VIS: 57 DROP SURV & POOH. TIGHT & SWABBING T/SHOE, FILL HOLE THRU DP. CBU @ SHOE. POOH RETREIVE SURV. STND BACK BHA/READ MWD/CHANGE BIT. SERV. WEAR RING. MU BHA & RIH T/SHOE. CUT DL SFTY CHK. BRAKES & INSPECT DL. WASH & REAM BRIDGES F/4750 T/6813. DRLG & SURV. F/6813 T/7700. RIH W/ NB MW: 9.5 VIS: 71 CBU. 10 STAND WIPER TRIP. DRLG AND SURVEY F/ 7700-8551' CBU. POH F/ NEW BIT AND BHA. CHANGE BHA-ORIENT & CALIBRATE MWD - CHANGE BITS. RIH W/ NB. DRLG & SURVEYS MW: 9.8 VIS: 71 RIH, TIGHT @ 811 - MAD PASS F/ 8182-8551' DRLG AND SURVEYS F/ 8551-9406' CBU. 10 STAND WIPER TRIP, NO TIGHT HOLE. DRLG AND SURVEYS F/ 9406-9842'. DRLG & SURVEYS MW: 9.9 VIS: 67 DRLG & SURVEYS F/ 9843-10216'. CBU. WIPER TRIP TO SHOE, TIGHT HOLE F/ 8370-6600' CUT DRLG. LINE. RIH, HOLE CLEAN. DRLG ANS SURVEYS F/ 10216-10570'. CLN #1 PIT AFTER DISPLACE MW: 9.8 VIS: 68 DRLG F/ 10570-10706'. CIRC HOLE CLEAN. POH - RETRIEVE MWD DATA - CHANGE BHA. SERVICE WEAR RING. INSTALL SOURCE IN ANADRILL & RIH. SERVICE RIG & SAFETY MEETING. RIH. CBU. PUMP 50 BBL H20 & CHEMICAL SPACER FOLLOWED BY 100 BBL XANVIS SPACER, DISPLACED W/ KCL MUD. TD CBU MW: 9.8 VIS: 54 CLEAN MUD PITS #1 & 2. CHANGE OVER TO KCL MUD. DRLG AND SURVEYS F/ 10706-11180' LAYING DOWN BHA MW:10.0 VIS: 61 CIRC HOLE CLEAN. WIPER TRIP TO 10363'. MAD PASS F/ BIT DEPTH 10372-10730' RIH, TIGHT @ 10860'. CIRC HOLE CLEAN. POH 15 STANDS - PUMP DRY JOB & LAY DOWN DRILL PIPE. LAY DOWN ALL BHA - REMOVE INFO F/ ANADRILL TOOLS AND SPERRY SUN TOOLS. WELL ' P2-54 OPERATION: RIG : DOYON 14 PAGE: 3 05/12/94 (14) TD:lll80' ( 0) 05/13/94 (15) TD:lll80 PB:ll081 05/14/94 (16) TD:lll80 PB:ll081 05/15/94 (17) TD:lll80 PB:ll081 LD LANDING JOINT MW: 8.5 VIS: 26 CONTINUE TO CHANGE RAM TO 7 5/8" AND TEST DOOR SEAL. R/U AND RUN 27 JTS 29.7# 13 CR NSCC AND 244 JTS 7 5/8" 29.7# NT95LHE NSCC CASING. M/U LANDING JT, TIGHT HOLE. CIRC AND WORK PIPE DOWN THE LAST 40'. CIRC AND CONDITION MUD, R/U BJ MATCH MIX CMT. PUMP 20 BBLS 2% KCL WATER. TEST LINES. L/D LANDING JOINT AND CSG TOOLS. LAND 4.5" COMP. STRING MW: 0.0 Seawater LD CASG EQUIP & CLEAR FLOOR. INSTALL FMC 7-5/8" PACK OFF & TEST T/5000. OK. CLEAN & STRAP 4.5" 12.6# 13CR NSCR TBG. RUN 4.5 TBG W/JEWELRY. MU SSSV & CL TEST T/5000 PSI. OK. CON'T RUNNING TBG. MU FMC TBG HNGR & TEST CL T/5000. OK. RIG RELEASED MW: 8.5 Seawater LAND TBG. TOTAL JTS = 253. 4.5" 12.6#. 13 CR NSCT. TAIL @ 10254. XN 610222 X NIPPLES @ 10205,10150. PKR @ 10172, SET SSSV @ 2074 W/2-WAY CK IN PLACE. RUN IN LDS. CHANGE PIPE RAMS F/7-5/7" T/4.5 & 7" ND BOP. NU ADAPTER FLNG. TEST T/5000/ OK. NU TREE/TEST T/5000. RU DRILL SITE MAINT. LUBCTR. & PULL 2-WAY CHK. RU LITTLE RED'S & PUMP 156 BBLS + 57 BBLS F/FRZ PROTECT. DOWN TBG. DROP BALL ROD. PUMP 87 BBLS DIESEL DOWN ANNULUS (10.75 X 7-5/8) COVER 2200' ANNUL. PUMP DOWN TBG. SET PKR W/4000. HOLD 30 MIN. BLEED BACK T/500. PUMP DWN ANNUL. T/3500/HOLD 30 MIN. OK. BLEED T/0 & SET BPV. CLOSE SSSV. PUMP OUT CELLAR & PITS - SECURE WELL & RELEASE @ 19:00 HOURS ON 5/13/94. MW: 8.5 Seawater SIGNATURE: ) (dri~ng superintendent DATE: SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 'COURS INCLN DG MN 0 .00 -46.95 313 312.99 266.04 402 401.99 355.04 493 492.99 446.04 580 579.98 533.03 DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC 670 669.96 623.01 762 761.92 714.97 852 851.84 804.89 939 938.89 891.94 1031 1030.78 983.83 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 1123 1122.98 1076.03 1213 1211.86 1164.91 1306 1304.43 1257.48 1400 1397.22 1350.27 1491 1486.79 1439.84 0 0 N .00 E .00 .00N .00E 0 27 N 28.81 E .15 1.10N .61E 0 22 N 61.27 E .28 1.56N 1.04E 0 35 S 88.83 E .35 1.69N 1.77E 1 4 S 79.01 E .58 1.53N 3.02E 1588 1582.54 1535.59 1682 1674.44 1627.49 1775 1765.97 1719.02 1870 1859.82 1812.87 1965 1952.20 1905.25 1 8 S 68.39 E .24 1.03N 4.69E 2 10 S 65.89 E 1.12 .01S 7.13E 2 41 S 65.32 E .58 1.59S 10.60E 3 42 S 60.45 E 1.21 3.84S 14.92E 5 7 S 58.42 E 1.55 7.47S 21.02E 2056 2042.04 1995.09 2151 2134.66 2087.71 2245 2226.19 2179.24 2336 2313.97 2267.02 2427 2401.69 2354.74 2523 2493.44 2446.49 2619 2583.21 2536.26 2712 2670.73 2623.78 2805 2757.76 2710.81 2897 2842.30 2795.35 5 11 S 52.23 E .60 12.20S 27.86E 6 54 S 44.82 E 2.10 18.48S 34.84E 7 49 S 46.08 E 1.01 26.87S 43.37E 8 6 S 42.73 E .57 36.15S 52.44E 9 25 S 50.23 E 1.93 45.59S 62.48E 2994 2930.71 2883.76 3087 3014.59 2967.64 3182 3098.42 3051.47 3276 3180.93 3133.98 3369 3260.58 3213.63 11 8 S 54.07 E 1.89 56.20S 76.23E 11 22 S 53.84 E .25 66.97S 91.01E 10 39 S 51.06 E .95 77.81S 105.14E 11 4 S 50.01 E .49 89.27S 119.05E 11 13 S 50.36 E .18 100.93S 133.05E 11 28 S 48.37 E .51 112.68S 146.73E 11 38 S 47.96 E .20 125.32S 160.85E 14 16 S 51.85 E 2.95 138.83S 177.01E 16 21 S 57.03 E 2.73 152.74S 196.59E 16 30 S 55.77 E .42 167.06S 218.14E 18 31 S 55.63 E 2.10 183.39S 242.07E 20 32 S 58.07 E 2.29 200.78S 268.76E 20 55 S 55.79 E .95 218.86S 296.51E 21 8 S 56.21 E .29 237.57S 324.25E 23 8 S 54.90 E 2.27 257.04S 352.62E VERT. SECT. .00 -.16 -.08 .44 1.55 3.18 5.77 9.51 14.32 21.39 29.70 39.04 50.88 63.67 77.35 94.70 112.99 130.80 148.79 166.96 25 15 S 55.38 E 2.19 279.75S 385.23E 27 10 S 56.27 E 2.10 302.94S 419.41E 27 37 S 55.41 E .63 327.35S 455.37E 29 55 S 54.97 E 2.44 353.22S 492.57E 32 15 S 56.62 E 2.67 380.19S 532.29E 184.94 203.80 224.81 248.83 274.69 303.64 335.45 368.53 401.97 436.36 476.09 517.38 560.81 606.12 654.10 RECEIVED AUG -5 i994 Oil & Gas Cons. Commission Anchor~.j~ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN 3461 3338.81 3291.86 3550 3413.09 3366.14 3645 3490.11 3443.16 3738 3563.70 3516.75 3830 3633.60 3586.65 DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 32 16 S 55.10 E .88 407.90S 573.16E 34 20 S 54.82 E 2.35 435.93S 613.12E 36 54 S 55.29 E 2.71 467.54S 658.37E 39 4 S 55.98 E 2.38 499.97S 705.81E 41 30 S 59.03 E 3.41 531.77S 755.80E FT. VERT. SECT. 703.45 752.25 807.43 864.88 924.01 3887 3676.51 3629.56 4012 3770.68 3723.73 4105 3840.40 3793.45 4195 3906.36 3859.41 4288 3973.66 3926.71 41 32 S 59.32 E .35 551.23S 788.43E 40 50 S 55.65 E 2.01 595.51S 857.92E 42 5 S 58.20 E 2.25 629.11S 909.55E 43 31 S 59.84 E 2.02 660.55S 961.93E 42 52 S 58.38 E 1.30 692.99S 1016.17E 961.84 1044.09 1105.60 1166.45 1229.39 4382 4043.34 3996.39 4477 4113.38 4066.43 4571 4183.00 4136.05 4664 4251.51 4204.56 4757 4320.73 4273.78 42 22 S 57.33 E .91 727.11S 1070.47E 42 16 S 58.59 E .90 760.95S 1124.54E 42 13 S 58.23 E .26 794.08S 1178.41E 42 7 S 57.49 E .55 827.10S 1230.97E 42 9 S 56.61 E .63 861.17S 1283.53E 1293.37 1357.01 1420.06 1481.98 1544.52 4851 4390.58 4343.63 4945 4459.78 4412.83 5038 4528.97 4482.02 5130 4598.08 4551.13 5222 4666.04 4619.09 42 9 S 58.43 E 1.30 895.13S 1336.88E 42 2 S 58.18 E .22 927.99S 1390.09E 41 56 S 58.82 E .48 960.53S 1443.19E 41 49 S 57.81 E .74 993.08S 1495.93E 41 59 S 58.76 E .72 1025.15S 1547.83E 1607.64 1670.00 1732.09 1793.88 1854.71 5315 4735.56 4688.61 5408 4805.10 4758.15 5503 4875.57 4828.62 5599 4946.93 4899.98 5690 5014.77 4967.82 41 42 S 58.00 E .63 1057.79S 1600.84E 41 47 S 57.55 E .34 1090.88S 1653.34E 41 59 S 57.32 E .26 1124.91S 1706.62E 42 4 S 57.06 E .20 1159.77S 1760.69E 42 4 S 56.21 E .62 1193.45S 1811.84E 1916.78 1978.70 2041.80 2106.03 2167.22 5783 5083.44 5036.49 5876 5153.03 5106.08 5970 5222.72 5175.77 6062 5291.09 5244.14 6155 5359.33 5312.38 41 58 S 55.93 E .23 1228.01S 1863.21E 41 39 S 55.06 E .71 1263.27S 1914.51E 41 46 S 56.61 E 1.11 1298.16S 1965.92E 43 0 S 52.62 E 3.19 1334.30S 2016.76E 42 55 S 52.28 E .26 1373.04S 2067.15E 2229.08 2291.31 2353.41 2415.78 2479.31 6249 5427.97 5381.02 6342 5495.75 5448.80 6435 5564.05 5517.10 6530 5633.80 5586.85 6623 5701.73 5654.78 43 1 S 52.22 E .11 1412.19S 2117.71E 42 49 S 50.85 E 1.03 1451.39S 2167.06E 42 50 S 46.22 E 3.38 1493.29S 2214.47E 42 51 S 47.28 E .76 1537.62S 2261.60E 42 39 S 48.50 E .92 1579.74S 2308.20E 2543.24 2606.20 2669.20 2733.39 2795.85 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 6716 5770.41 5723.46 6810 5839.42 5792.47 6903 5907.52 5860.57 6998 5976.92 5929.96 7091 6045.54 5998.59 COURS INCLN DG MN 42 50 42 52 43 1 42 15 43 1 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. S 48.66 E .22 1621.75S 2355.81E S 49.16 E .36 1663.83S 2404.07E S 47.47 E 1.25 1705.98S 2451.40E S 48.17 E .95 1748.88S 2498.75E S 47.94 E .83 1791.12S 2545.75E 2859.07 2922.84 2985.92 3049.45 3112.31 7185 6114.75 6067.80 41 52 7278 6184.01 6137.06 41 45 7372 6254.34 6207.39 41 12 7462 6322.18 6275.23 41 26 7555 6392.10 6345.15 40 57 S 50.62 E 2.28 1832.42S 2593.70E S 49.75 E .64 1872.10S 2641.29E S 50.76 E .92 1911.85S 2689.09E S 50.75 E .27 1949.58S 2735.28E S 50.39 E .59 1988.45S 2782.55E 3175.38 3237.21 3299.24 3358.79 3419.89 7650 6463.93 6416.98 7741 6532.91 6485.96 7836 6605.69 6558.74 7929 6675.98 6629.03 8022 6745.40 6698.45 40 56 40 7 40 40 41 30 41 49 S 49.06 E .92 2028.73S 2830.09E S 54.70 E 4.14 2065.12S 2876.43E S 55.56 E .82 2100.53S 2927.26E S 58.45 E 2.22 2133.90S 2978.67E S 57.65 E .66 2166.59S 3031.09E 3482.03 3540.91 3602.85 3664.05 3725.66 8114 6813.54 6766.59 8208 6884.17 6837.22 8304 6955.29 6908.34 8398 7024.66 6977.71 8493 7094.16 7047.21 41 42 41 45 41 43 43 3 43 19 S 58.37 E .54 2198.82S 3082.68E S 57.39 E .69 2232.31S 3136.03E S 58.32 E .65 2266.07S 3189.75E S 56.86 E 1.76 2300.02S 3243.21E S 55.56 E .98 2336.31S 3297.43E 3786.34 3849.18 3912.48 3975.69 4040.88 8585 7161.58 7114.63 8679 7230.84 7183.89 8769 7297.21 7250.26 8862 7365.88 7318.93 8954 7434.37 7387.42 9047 7504.01 7457.06 9141 7573.98 7527.03 9235 7644.28 7597.33 9320 7708.42 7661.47 9422 7785.52 7738.57 42 38 42 34 42 8 42 8 41 58 41 49 41 34 41 22 41 10 40 46 S 56.64 E 1.09 2371.36S 3349.59E S 55.27 E .99 2407.01S 3402.36E S 55.53 E .52 2441.37S 3452.16E S 56.98 E 1.05 2475.89S 3503.83E S 57.03 E .19 2509.54S 3555.65E S 55.67 E .98 2544.16S 3607.66E S 55.73 E .28 2579.29S 3659.17E S 53.49 E 1.60 2615.26S 3709.80E S 54.13 E .55 2648.50S 3755.23E S 51.00 E 2.05 2689.17S 3808.38E 4103.68 4167.33 4227.81 4289.89 4351.60 4414.02 4476.34 4538.45 4594.74 4661.65 9515 7855.60 7808.65 9609 7925.87 7878.92 9702 7994.45 7947.50 9797 8065.57 8018.62 9888 8133.57 8086.62 41 10 42 3 42 3 41 46 41 49 S 52.81 E 1.35 2726.71S 3856.27E S 49.22 E 2.71 2765.97S 3904.75E S 49.38 E .12 2806.33S 3951.67E S 49.95 E .50 2847.66S 4000.35E S 51.16 E .89 2886.29S 4047.30E 4722.45 4784.76 4846.44 4910.12 4970.81 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 9981 8202.91 8155.96 41 31 S 51.59 E .45 2924.82S 4095.53E 10075 8272.97 8226.02 41 17 S 50.79 E .62 2963.54S 4143.66E 10166 8342.00 8295.05 40 49 S 51.66 E .81 3001.19S 4190.54E 10261 8414.15 8367.20 40 20 S 51.45 E '.52 3039.62S 4238.94E 10353 8484.56 8437.61 39 52 S 50.76 E .71 3076.86S 4285.10E VERT. SECT. 5032.48 5094.18 5154.24 5215.99 5275.22 10446 8555.54 8508.59 39 55' S 50.45 E .22 3114.52S 4330.96E 10539 8627.14 8580.19 39 13 S 51.70 E 1.14 3151.72S 4377.01E 10615 8686.31 8639.36 39 6 S 50.52 E .99 3181.98S 4414.53E 10729 8775.77 8728.82 37 59 S 49.70 E 1.08 3227.69S 4469.23E 10822 8849.60 8802.65 35 49 S 49.58 E 2.35 3263.60S 4511.48E 5334.47 5393.58 5441.73 5512.86 5568.14 10916 8926.35 8879.40 35 7 S 48.74 E .90 3299.36S 4552.86E 11010 9003.36 8956.41 34 27 S 50.58 E 1.33 3334.00S 4593.63E 11101 9079.53 9032.58 32 55 S 48.56 E 2.08 3366.91S 4632.30E 11180 9145.14 9098.19 32 55 S 48.56 E .00 3395.03S 4664.14E 5622.64 5676.00 5726.63 5768.92 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5768.92 FEET AT SOUTH 53 DEG. 56 MIN. EAST AT MD = 11180 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 126.05 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -46.95 .00 N .00 E 1000 999.54 952.59 6.00 S 18.63 E 2000 1986.53 1939.58 105.28 S 138.29 E 3000 2936.01 2889.06 281.17 S 387.28 E 4000 3760.90 3713.95 590.74 S 850.94 E .00 .46 .46 13.47 13.01 63.99 50.53 239.10 175.11 5000 4500.61 4453.66 947.34 S 1421.40 E 6000 5244.91 5197.96 1309.34 S 1982.46 E 7000 5978.28 5931.33 1749.71 S 2499.67 E 8000 6728.34 6681.39 2158.42 S 3018.19 E 9000 7468.28 7421.33 2526.13 S 3581.24 E 499.39 260.28 755.09 255.70 1021.72 266.63 1271.66 249.95 1531.72 260.06 10000 8216.57 8169.62 2932.34 S 4105.00 E 11000 8994.88 8947.93 3330.31 S 4589.14 E 11180 9145.14 9098.19 3395.03 S 4664.14 E 1783.43 251.71 2005.12 221.69 2034.86 29.74 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 JOB NUMBER: AK-MM-94 0416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 0 .00 -46.95 .00 N .00 E .00 46 46.95 .00 .00 N .00 E .00 146 146.95 100.00 .01 N .00 E .00 246 246.95 200.00 .64 N .35 E .00 346 346.95 300.00 1.34 N .74 E .01 VERTICAL CORRECTION .00 .00 .00 .00 446 446.95 400.00 1.68 N 1.32 E .01 546 546.95 500.00 1.64 N 2.41 E .02 646 646.95 600.00 1.20 N 4.26 E .03 747 746.95 700.00 .22 N 6.61 E .07 847 846.95 800.00 1.50 S 10.39 E .16 .O0 .01 .02 .04 .09 947 946.95 900.00 4.10 S 15.37 E .32 1047 1046.95 1000.00 8.23 S 22.26 E .65 1148 1146.95 1100.00 13.53 S 29.58 E 1.06 1248 1246.95 1200.00 21.50 S 37.83 E 1.72 1349 1346.95 1300.00 30.96 S 47.57 E 2.64 .16 .33 .41 .66 .92 1450 1446.95 1400.00 41.36 S 57.48 E 3.67 1552 1546.95 1500.00 52.09 S 70.55 E 5.10 1653 1646.95 1600.00 63.70 S 86.55 E 7.03 1755 1746.95 1700.00 75.56 S 102.36 E 8.97 1857 1846.95 1800.00 87.65 S 117.12 E 10.77 1.03 1.43 1.94 1.94 1.81 1959 1946.95 1900.00 100.26 S 132.24 E 12.69 2061 2046.95 2000.00 113.34 S 147.48 E 14.69 2163 2146.95 2100.00 127.04 S 162.79 E 16.78 2266 2246.95 2200.00 142.10 S 181.16 E 19.57 2370 2346.95 2300.00 158.01 S 204.72 E 23.55 1.92 2.00 2.09 2.79 3.98 2474 2446.95 2400.00 174.68 S 229.33 E 27.88 2580 2546.95 2500.00 193.59 S 257.22 E 33.41 2687 2646.95 2600.00 213.75 S 289.00 E 40.26 2794 2746.95 2700.00 235.24 S 320.78 E 47.37 2902 2846.95 2800.00 258.18 S 354.24 E 55.30 4.33 5.53 6.85 7.11 7.93 3012 2946.95 2900.00 284.10 S 391.53 E 65.15 3124 3046.95 3000.00 312.18 S 433.23 E 77.09 3237 3146.95 3100.00 342.04 S 476.61 E 90.11 3353 3246.95 3200.00 375.46 S 525.11 E 106.20 3471 3346.95 3300.00 410.85 S 577.38 E 124.45 9.85 11.94 13.02 16.08 18.25 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MClNTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 JOB NUMBER: AK-MM- 940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3591 3446.95 3400.00 3717 3546.95 3500.00 3848 3646.95 3600.00 3981 3746.95 3700.00 4114 3846.95 3800.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 449.52 S 632.48 E 145.03 20.57 492.36 S 694.54 E 170.30 25.27 537.84 S 765.93 E 201.33 31.04 583.93 S 840.98 E 234.61 33.28 632.23 S 914.58 E 267.86 33.25 4251 3946.95 3900.00 4387 4046.95 4000.00 4523 4146.95 4100%00 4658 4246.95 4200.00 4792 4346.95 4300.00 680.00 S 995.04 E 728.89 S 1073.24 E 776.87 S 1150.59 E 824.88 S 1227.49 E 874.23 S 1303.35 E 304.82 36.96 340.87 36.04 376.09 35.23 411.07 34.98 445.95 34.88 4927 4446.95 4400.00 5062 4546.95 4500.00 5196 4646.95 4600.00 5330 4746.95 4700.00 5464 4846.95 4800.00 921.88 S 1380.26 E 968.90 S 1457.02 E 1016.24 S 1533.13 E 1063.16 S 1609.44 E 1111.00 S 1684.94 E 480.80 34.85 515.34 34.55 549.64 34.29 583.90 34.26 618.02 34.12 5599 4946.95 4900.00 5734 5046.95 5000.00 5868 5146.95 5100.00 6002 5246.95 5200.00 6139 5346.95 5300.00 1159.78 S 1760.70 E 1209.62 S 1835.99 E 1260.18 S 1910.08 E 1310.40 S 1983.97 E 1365.99 S 2058.04 E 652.63 34.61 687.36 34.73 721.69 34.34 755.80 34.11 792.10 36.30 6275 5446.95 5400.00 6412 5546.95 5500.00 6548 5646.95 5600.00 6684 5746.95 5700.00 6821 5846.95 5800.00 1423.04 S 2131.71 E 1482.46 S 2202.90 E 1545.90 S 2270.57 E 1607.38 S 2339.48 E 1668.40 S 2409.35 E 828.78 36.68 865.18 36.39 901.58 36.40 937.70 36.12 974.11 36.41 6957 5946.95 5900.00 7093 6046.95 6000.00 7228 6146.95 6100.00 7362 6246.95 6200.00 7495 6346.95 6300.00 1730.70 S 2478.45 E 1792.01 S 2546.72 E 1850.76 S 2615.99 E 1907.75 S 2684.08 E 1963.41 S 2752.22 E 1010.70 36.59 1046.42 35.72 1081.53 35.11 1115.27 33.74 1148.46 33.19 7627 6446.95 6400.00 7759 6546.95 6500.00 7891 6646.95 6600.00 8024 6746.95 6700.00 8158 6846.95 6800.00 2019.08 S 2818.97 E 2071.96 S 2886.09 E 2120.43 S 2956.83 E 2167.33 S 3032.25 E 2214.43 S 3108.03 E 1180.96 32.50 1212.53 31.57 1244.27 31.74 1278.02 33.75 1312.04 34.02 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING DATE OF SURVEY: 051094 PT. MCINTYRE/P2-54 500292247000 JOB NUMBER: AK-MM-940416 NORTH SLOPE KELLY BUSHING ELEV. = 46.95 FT. COMPUTATION DATE: 5/11/94 OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8293 6946.95 6900.00 2262.16 S 3183.42 E 1346.06 34.02 8428 7046.95 7000.00 2311.40 S 3260.65 E 1381.68 35.62 8565 7146.95 7100.00 2363.95 S 3338.33 E 1418.79 37.10 8701 7246.95 7200.00 2415.45 S 3414.52 E 1454.65 35.86 8836 7346.95 7300.00 2466.55 S 3489.47 E 1489.67 35.02 8971 7446.95 7400.00 2515.69 S 3565.15 E 1524.36 34.69 9105 7546.95 7500.00 2565.79 S 3639.35 E 1558.58 34.23 9239 7646.95 7600%00 2616.66 S 3711.70 E 1592.09 33.51 9371 7746.95 7700.00 2668.35 S 3782.40 E 1625.03 32.93 9504 7846.95 7800.00 2722.14 S 3850.24 E 1657.31 32.28 9638 7946.95 7900.00 2778.40 S 3919.16 E 1691.19 33.88 9772 8046.95 8000.00 2836.95 S 3987.61 E 1725.78 34.59 9906 8146.95 8100.00 2893.80 S 4056.63 E 1759.93 34.15 10040 8246.95 8200.00 2949.09 S 4125.96 E 1793.58 33.65 10173 8346.95 8300.00 3003.84 S 4193.89 E 1826.30 32.71 10304 8446.95 8400.00 3056.98 S 4260.69 E 1857.78 31.48 10435 8546.95 8500.00 3109.95 S 4325.42 E 1888.14 30.37 10564 8646.95 8600.00 3161.75 S 4389.70 E 1917.82 29.67 10693 8746.95 8700.00 3213.13 S 4452.06 E 1946.39 28.58 10818 8846.95 8800.00 3262.36 S 4510.02 E 1972.04 25.65 10941 8946.95 8900.00 3308.92 S 4563.75 E 1994.74 22.70 11063 9046.95 9000.-'00 3352.95 S 4616.48 E 2016.07 21.33 11180 9145.14 9098.19 3395.03 S 4664.14 E 2034.86 18.78 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS Date: Subject: From: To' ARCO Alaska Inc. Greater Point McIntyre Engineering May 13, 1994 Transmittal Number ARCO Alaska, Inc. Bob Crandall AOGCC 3001 Porcupine Drive Anchorage, AK 99501 724 The following Greater Point McIntyre Area data are enclosed. This information is confidential and vour cooveration in maintaining confidentiality is appreciated: P1-03 ~FINAL LOG: Perforation Record (2 1/8" Enerjet) I 4-15-94 Schlumberger P2-21 v/FINAL DISKETTE: MWD Sub-Surface v/Directional Survey P2-31 ,/'-FINAL TAPE: DLL/ZDL/CN/GR 7099 - 9806 w/LIS (LDWG) Vet P2-54 .WFINAL DISKETTE: MWD Sub-Surface -dDirectional Survey 4-25-94 Sperry Sun I 4-10-94 Atlas Wireline 5-10-94 Sperry Sun Please sign _~~ __ _~.~ ...... and return to: Elizabeth R. Barker, ATO-415 ARCO Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -46.95 0 0 313 312.99 266.04 0 27 402 401.99 355.04 0 22 493 492.99 446.04 0 35 580 579.98 533.03 1 4 N .00 E .00 .00N .00E N 28.81 E .15 1.10N .61E N 61.27 E .28 1.56N 1.04E S 88.83 E .35 1.69N 1.77E S 79.01 E .58 1.53N 3.02E .0O -.16 -.08 .44 1.55 670 669.96 623.01 1 8 762 761.92 714.97 2 10 852 851.84 804.89 2 41 939 938.89 891.94 3 42 1031 1030.78 983.83 5 7 S 68.39 E .24 1.03N 4.69E S 65.89 E 1.12 .01S 7.13E S 65.32 E .58 1.59S 10.60E S 60.45 E 1.21 3.84S 14.92E S 58.42 E 1.55 7.47S 21.02E 3.18 5.77 9.51 14.32 21.39 1123 1122.98 1076.03 5 11 1213 1211.86 1164.91 6 54 1306 1304.43 1257.48 7 49 1400 1397.22 1350.27 8 6 1491 1486.79 1439.84 9 25 S 52.23 E .60 12.20S 27.86E S 44.82 E 2.10 18.48S 34.84E S 46.08 E 1.01 26.87S 43.37E S 42.73 E .57 36.15S 52.44E S 50.23 E 1.93 45.59S 62.48E 29.70 39.04 50.88 63.67 77.35 1588 1582.54 1535.59 11 8 1682 1674.44 1627.49 11 22 1775 1765.97 1719.02 10 39 1870 1859.82 1812.87 11 4 1965 1952.20 1905.25 11 13 S 54.07 E 1.89 56.20S 76.23E S 53.84 E .25 66.97S 91.01E S 51.06 E .95 77.81S 105.14E S 50.01 E .49 89.27S 119.05E S 50.36 E .18 100.93S 133.05E 94.70 112.99 130.80 148.79 166.96 2056 2042.04 1995.09 11 28 2151 2134.66 2087.71 11 38 2245 2226.19 2179.24 14 16 2336 2313.97 2267.02 16 21 2427 2401.69 2354.74 16 30 S 48.37 E .51 112.68S 146.73E S 47.96 E .20 125.32S 160.85E S 51.85 E 2.95 138.83S 177.01E S 57.03 E 2.73 152.74S 196.59E S 55.77 E .42 167.06S 218.14E 184.94 203.80 224.81 248.83 274.69 2523 2493.44 2446.49 18 31 2619 2583.21 2536.26 20 32 2712 2670.73 2623.78 20 55 2805 2757.76 2710.81 21 8 2897 2842.30 2795.35 23 8 S 55.63 E 2.10 183.39S 242.07E S 58.07 E 2.29 200.78S 268.76E S 55.79 E .95 218.86S 296.51E S 56.21 E .29 237.57S 324.25E S 54.90 E 2.27 257.04S 352.62E 303.64 335.45 368.53 401.97 436.36 2994 2930.71 2883.76 25 15 3087 3014.59 2967.64 27 1'0 3182 3098.42 3051.47 27 37 3276 3180.93 3133.98 29 55 3369 3260.58 3213.63 32 15 S 55.38 E 2.19 279.75S 385.23E S 56.27 E 2.10 302.94S 419.41E S 55.41 E .63 327.35S 455.37E S 54.97 E 2.44 353.22S 492.57E S 56.62 E 2.67 380.19S 532.29E 476.09 517.38 560.81 606.12 654.10 RECEIVED Alaska Oil & ~.s" bO_DS, i" n~ ¢,' '~'~ t!nchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 3461 3338.81 3291.86 3550 3413.09 3366.14 3645 3490.11 3443.16 3738 3563.70 3516.75 3830 3633.60 3586.65 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 32 16 S 55.10 E .88 407.90S 573.16E 34 20 S 54.82 E 2.35 435.93S 613.12E 36 54 S 55.29 E 2.71 467.54S 658.37E 39 4 S 55.98 E 2.38 499.97S 705.81E 41 30 S 59.03 E 3.41 531.77S 755.80E VERT. SECT. 703.45 752.25 807.43 864.88 924.01 3887 3676.51 3629.56 4012 3770.68 3723.73 4105 3840.40 3793.45 4195 3906.36 3859.41 4288 3973.66 3926.71 4382 4043.34 3996.39 4477 4113.38 4066.43 4571 4183.00 4136.05 4664 4251.51 4204.56 4757 4320.73 4273.78 41 32 S 59.32 E .35 551.23S 788.43E 40 50 S 55.65 E 2.01 595.51S 857.92E 42 5 S 58.20 E 2.25 629.11S 909.55E 43 31 S 59.84 E 2.02 660.55S 961.93E 42 52 S 58.38 E 1.30 692.99S 1016.17E 42 22 S 57.33 E .91 727.11S 1070.47E 42 16 S 58.59 E .90 760.95S 1124.54E 42 13 S 58.23 E .26 794.08S 1178.41E 42 7 S 57.49 E .55 827.10S 1230.97E 42 9 S 56.61 E .63 861.17S 1283.53E 961.84 1044.09 1105.60 1166.45 1229.39 1293.37 1357.01 1420.06 1481.98 1544.52 4851 4390.58 4343.63 4945 4459.78 4412.83 5038 4528.97 4482.02 5130 4598.08 4551.13 5222 4666.04 4619.09 42 9 S 58.43 E 1.30 895.13S 1336.88E 42 2 S 58.18 E .22 927.99S 1390.09E 41 56 S 58.82 E .48 960.53S 1443.19E 41 49 S 57.81 E .74 993.08S 1495.93E 41 59 S 58.76 E .72 1025.15S 1547.83E 1607.64 1670.00 1732.09 1793.88 1854.71 5315 4735.56 4688.61 5408 4805.10 4758.15 '5503 4875.57 4828.62 5599 4946.93 4899.98 5690 5014.77 4967.82 41 42 S 58.00 E .63 1057.79S 1600.84E 41 47 S 57.55 E .34 1090.88S 1653.34E 41 59 S 57.32 E .26 1124.91S 1706.62E 42 4 S 57.06 E .20 1159.77S 1760.69E 42 4 S 56.21 E .62 1193.45S 1811.84E 1916.78 1978.70 2041.80 2106.03 2167.22 5783 5083.44 5036.49 5876 5153.03 5106.08 5970 5222.72 5175.77 6062 5291.09 5244.14 6155 5359.33 5312.38 41 58 S 55.93 E .23 1228.01S 1863.21E 41 39 S 55.06 E .71 1263.27S 1914.51E 41 46 S 56.61 E 1.11 1298.16S 1965.92E 43 0 S 52.62 E 3.19 1334.30S 2016.76E 42 55 S 52.28 E .26 1373.04S 2067.15E 2229.08 2291.31 2353.41 2415.78 2479.31 6249 5427.97 5381.02 6342 5495.75 5448.80 6435 5564.05 5517.10 6530 5633.80 5586.85 6623 5701.73 5654.78 43 1 S 52.22 E .11 1412.19S 2117.71E 42 49 S 50.85 E 1.03 1451.39S 2167.06E 42 50 S 46.22 E 3.38 1493.29S 2214.47E 42 51 S 47.28 E .76 1537.62S 2261.60E 42 39 S 48.50 E .92 1579.74S 2308.20E 2543.24 2606.20 2669.20 2733.39 2795.85 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/9 DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6716 5770.41 5723.46 6810 5839.42 5792.47 6903 5907.52 5860.57 6998 5976.92 5929.96 7091 6045.54 5998.59 42 50 S 48.66 E .22 1621.75S 2355.81E 42 52 S 49.16 E .36 1663.83S 2404.07E 43 1 S 47.47 E 1.25 1705.98S 2451.40E 42 15 S 48.17 E .95 1748.88S 2498.75E 43 1 S 47.94 E .83 1791.12S 2545.75E 2859.07 2922.84 2985.92 3049.45 3112.31 7185 6114.75 6067.80 7278 6184.01 6137.06 7372 6254.34 6207.39 7462 6322.18 6275.23 7555 6392.10 6345.15 41 52 S 50.62 E 2.28 1832.42S 2593.70E 41 45 S 49.75 E .64 1872.10S 2641.29E 41 12 S 50.76 E .92 1911.85S 2689.09E 41 26 S 50.75 E .27 1949.58S 2735.28E 40 57 S 50.39 E .59 1988.45S 2782.55E 3175.38 3237.21 3299.24 3358.79 3419.89 7650 6463.93 6416.98 7741 6532.91 6485.96 7836 6605.69 6558.74 7929 6675.98 6629.03 8022 6745.40 6698.45 40 56 S 49.06 E .92 2028.73S 2830.09E 40 7 S 54.70 E 4.14 2065.12S 2876.43E 40 40 S 55.56 E .82 2100.53S 2927.26E 41 30 S 58.45 E 2.22 2133.90S 2978.67E 41 49 S 57.65 E .66 2166.59S 3031.09E 3482.03 3540.91 3602.85 3664.05 3725.66 8114 6813.54 6766.59 8208 6884.17 6837.22 8304 6955.29 6908.34 8398 7024.66 6977.71 8493 7094.16 7047.21 41 42 S 58.37 E .54 2198.82S 3082.68E 41 45 S 57.39 E .69 2232.31S 3136.03E 41 43 S 58.32 E .65 2266.07S 3189.75E 43 3 S 56.86 E 1.76 2300.02S 3243.21E 43 19 S 55.56 E .98 2336.31S 3297.43E 3786.34 3849.18 3912.48 3975.69 4040.88 8585 7161.58 7114.63 8679 7230.84 7183.89 8769 7297.21 7250.26 8862 7365.88 7318.93 8954 7434.37 7387.42 42 38 S 56.64 E 1.09 2371.36S 3349.59E 42 34 S 55.27 E .99 2407.01S 3402.36E 42 8 S 55.53 E .52 2441.37S 3452.16E 42 8 S 56.98 E 1.05 2475.89S 3503.83E 41 58 S 57.03 E .19 2509.54S 3555.65E 4103.68 4167.33 4227.81 4289.89 4351.60 9047 7504.01 7457.06 9141 7573.98 7527.03 9235 7644.28 7597.33 9320 7708.42 7661.47 9422 7785.52 7738.57 41 49 S 55.67 E .98 2544.16S 3607.66E 41 34 S 55.73 E .28 2579.29S 3659.17E 41 22 S 53.49 E 1.60 2615.26S 3709.80E 41 10 S 54.13 E .55 2648.50S 3755.23E 40 46 S 51.00 E 2.05 2689.17S 3808.38E 4414.02 4476.34 4538.45 4594.74 4661.65 9515 7855.60 7808.65 9609 7925.87 7878.92 9702 7994.45 7947.50 9797 8065.57 8018.62 9888 8133.57 8086.62 41 10 S 52.81 E 1.35 2726.71S 3856.27E 42 3 S 49.22 E 2.71 2765.97S 3904.75E 42 3 S 49.38 E .12 2806.33S 3951.67E 41 46 S 49.95 E .50 2847.66S 4000.35E 41 49 S 51.16 E .89 2886.29S 4047.30E 4722.45 4784.76 4846.44 4910.12 4970.81 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/9 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN DATE OF SURVEY: 051094 MWD SURVEY JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 9981 8202.91 8155.96 41 31 S 51.59 E .45 2924.82S 4095.53E 10075 8272.97 8226.02 41 17 S 50.79 E .62 2963.54S 4143.66E 10166 8342.00 8295.05 40 49 S 51.66 E .81 3001.19S 4190.54E 10261 8414.15 8367.20 40 20 S 51.45 E .52 3039.62S 4238.94E 10353 8484.56 8437.61 39 52 S 50.76 E .71 3076.86S 4285.10E VERT. SECT. 5032.48 5094.18 5154.24 5215.99 5275.22 10446 8555.54 8508.59 39 55 S 50.45 E .22 3114.52S 4330.96E 10539 8627.14 8580.19 39 13 S 51.70 E 1.14 3151.72S 4377.01E 10615 8686.31 8639.36 39 6 S 50.52 E .99 3181.98S 4414.53E 10729 8775.77 8728.82 37 59 S 49.70 E 1.08 3227.69S 4469.23E 10822 8849.60 8802'.65 35 49 S 49.58 E 2.35 3263.60S 4511.48E 5334.47 5393.58 5441.73 5512.86 5568.14 10916 8926.35 8879.40 35 7 S 48.74 E .90 3299.36S 4552.86E 11010 9003.36 8956.41 34 27 S 50.58 E 1.33 3334.00S 4593.63E 11101 9079.53 9032.58 32 55 S 48.56 E 2.08 3366.91S 4632.30E 11180 9145.14 9098.19 32 55 S 48.56 E .00 3395.03S 4664.14E 5622.64 5676.00 5726.63 5768.92 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5768.92 FEET AT SOUTH 53 DEG. 56 MIN. EAST AT MD = 11180 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 126.05 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -46.95 .00 N .00 E 1000 999.54 952.59 6.00 S 18.63 E 2000 1986.53 1939.58 105.28 S 138.29 E 3000 2936.01 2889.06 281.17 S 387.28 E 4000 3760.90 3713.95 590.74 S 850.94 E .00 .46 .46 13.47 13.01 63.99 50.53 239.10 175.11 5000 4500.61 4453.66 947.34 S 1421.40 E 6000 5244.91 5197.96 1309.34 S 1982.46 E 7000 5978.28 5931.33 1749.71 S 2499.67 E 8000 6728.34 6681.39 2158.42 S 3018.19 E 9000 7468.28 7421.33 2526.13 S 3581.24 E 499.39 260.28 755.09 255.70 1021.72 266.63 1271.66 249.95 1531.72 260.06 10000 8216.57 8169.62 2932.34 S 4105.00 E 11000 8994.88 8947.93 3330.31 S 4589.14 E 11180 9145.14 9098.19 3395.03 S 4664.14 E 1783.43 251.71 2005.12 221.69 2034.86 29.74 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 DATE OF SURVEY: 051094 JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH FT. TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 0 .00 -46.95 .00 N .00 E .00 46 46.95 .00 .00 N .00 E .00 146 146.95 100.00 .01 N .00 E .00 246 246.95 200.00 .64 N .35 E .00 346 346.95 300.00 1.34 N .74 E .01 VERTICAL CORRECTION .00 .00 .00 .00 446 446.95 400.00 1.68 N 1.32 E .01 546 546.95 500.00 1.64 N 2.41 E .02 646 646.95 600.00 1.20 N 4.26 E .03 747 746.95 700.00 .22 N 6.61 E .07 847 846.95 800.00 1.50 S 10.39 E .16 .00 .01 .02 .04 .09 947 946.95 900.00 4.10 S 15.37 E .32 1047 1046.95 1000.00 8.23 S 22.26 E .65 1148 1146.95 1100.00 13.53 S 29.58 E 1.06 1248 1246.95 1200.00 21.50 S 37.83 E 1.72 1349 1346.95 1300.00 30.96 S 47.57 E 2.64 .16 .33 .41 .66 .92 1450 1446.95 1400.00 41.36 S 57.48 E 3.67 1552 1546.95 1500.00 52.09 S 70.55 E 5.10 1653 1646.95 1600.00 63.70 S 86.55 E 7.03 1755 1746.95 1700.00 75.56 S 102.36 E 8.97 1857 1846.95 1800.00 87.65 S 117.12 E 10.77 1.03 1.43 1.94 1.94 1.81 1959 1946.95 1900.00 100.26 S 132.24 E ,12.69 2061 2046.95 2000.00 113.34 S 147.48 E 14.69 2163 2146.95 2100.00 127.04 S 162.79 E 16.78 2266 2246.95 2200.00 142.10 S 181.16 E 19.57 2370 2346.95 2300.00 158.01 S 204.72 E 23.55 1.92 2.00 2.09 2.79 3.98 2474 2446.95 2400.00 174.68 S 229.33 E 27.88 2580 2546.95 2500.00 193.59 S 257.22 E 33.41 2687 2646.95 2600.00 213.75 S 289.00 E 40.26 2794 2746.95 2700.00 235.24 S 320.78 E 47.37 2902 2846.95 2800.00 258.18 S 354.24 E 55.30 4.33 5.53 6.85 7.11 7.93 3012 2946.95 2900.00 284.10 S 391.53 E 65.15 3124 3046.95 3000.00 312.18 S 433.23 E 77.09 3237 3146.95 3100.00 342.04 S 476.61 E 90.11 3353 3246.95 3200.00 375.46 S 525.11 E 106.20 3471 3346.95 3300.00 410.85 S 577.38 E 124.45 9.85 11.94 13.02 16.08 18.25 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-54 500292247000 NORTH SLOPE COMPUTATION DATE: 5/11/94 INTERPOLATED VALUES DATE OF SURVEY: 051094 JOB NUMBER: AK-MM-940416 KELLY BUSHING ELEV. = 46.95 FT. OPERATOR: ARCO ALASKA INC FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3591 3446.95 3400.00 3717 3546.95 3500.00 3848 3646.95 3600.00 3981 3746.95 3700.00 4114 3846.95 3800.00 4251 3946.95 3900.00 4387 4046.95 4000.00 4523 4146.95 4100%00 4658 4246.95 4200.00 4792 4346.95 4300.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 449.52 S 632.48 E 145.03 20.57 492.36 S 694.54 E 170.30 25.27 537.84 S 765.93 E 201.33 31.04 583.93 S 840.98 E 234.61 33.28 632.23 S 914.58 E 267.86 33.25 680.00 S 995.04 E 728.89 S 1073.24 E 776.87 S 1150.59 E 824.88 S 1227.49 E 874.23 S 1303.35 E 304.82 36.96 340.87 36.04 376.09 35.23 411.07 34.98 445.95 34.88 4927 4446.95 5062 4546.95 5196 4646.95 5330 4746.95 5464 4846.95 4400 4500 4600 4700 4800 .00 .00 .00 .00 .00 921.88 S 1380.26 E 968.90 S 1457.02 E 1016.24 S 1533.13 E 1063.16 S 1609.44 E 1111.00 S 1684.94 E 480.80 34.85 515.34 34.55 549.64 34.29 583.90 34.26 618.02 34.12 5599 4946.95 5734 5046.95 5868 5146.95 6002 5246.95 6139 5346.95 4900 5000 5100 5200 5300 .00 .00 .00 .00 .00 1159.78 S 1760.70 E 1209.62 S 1835.99 E 1260.18 S 1910.08 E 1310.40 S 1983.97 E 1365.99 S 2058.04 E 652.63 34.61 687.36 34.73 721.69 34.34 755.80 34.11 792.10 36.30 6275 5446.95 6412 5546.95 6548 5646.95 6684 5746.95 6821 5846.95 5400 5500 5600 5700 5800 .00 .00 .00 .00 .00 1423.04 S 2131.71 E 1482.46 S 2202.90 E 1545.90 S 2270.57 E 1607.38 S 2339.48 E 1668.40 S 2409.35 E 828.78 36.68 865.18 36.39 901.58 36.40 937.70 36.12 974.11 36.41 6957 5946.95 7093 6046.95 7228 6146.95 7362 6246.95 7495 6346.95 7627 6446.95 7759 6546.95 7891 6646.95 8024 6746.95 8158 6846.95 5900 6000 6100 6200 6300 6400 6500 6600 6700 6800 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 1730.70 S 2478.45 E 1792.01 S 2546.72 E 1850.76 S 2615.99 E 1907.75 S 2684.08 E 1963.41 S 2752.22 E 2019.08 S 2818.97 E 2071.96 S 2886.09 E 2120.43 S 2956.83 E 2167.33 S 3032.25 E 2214.43 S 3108.03 E 1010.70 36.59 1046.42 35.72 1081.53 35.11 1115.27 33.74 1148.46 33.19 1180.96 32.50 1212.53 31.57 1244.27 31.74 1278.02 33.75 1312.04 34.02 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING DATE OF SURVEY: 051094 PT. MCINTYRE/P2-54 500292247000 JOB NUMBER: AK-MM-940416 NORTH SLOPE KELLY BUSHING ELEV. = 46.95 FT. COMPUTATION DATE: 5/11/94 OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8293 6946.95 6900.00 2262.16 S 3183.42 E 1346.06 34.02 8428 7046.95 7000.00 2311.40 S 3260.65 E 1381.68 35.62 8565 7146.95 7100.00 2363.95 S 3338.33 E 1418.79 37.10 8701 7246.95 7200.00 2415.45 S 3414.52 E 1454.65 35.86 8836 7346.95 7300.00 2466.55 S 3489.47 E 1489.67 35.02 8971 7446.95 7400.00 2515.69 S 3565.15 E 1524.36 34.69 9105 7546.95 7500.00 2565.79 S 3639.35 E 1558.58 34.23 9239 7646.95 7600%00 2616.66 S 3711.70 E 1592.09 33.51 9371 7746.95 7700.00 2668.35 S 3782.40 E 1625.03 32.93 9504 7846.95 7800.00 2722.14 S 3850.24 E 1657.31 32.28 9638 7946.95 7900.00 2778.40 S 3919.16 E 1691.19 33.88 9772 8046.95 8000.00 2836.95 S 3987.61 E 1725.78 34.59 9906 8146.95 8100.00 2893.80 S 4056.63 E 1759.93 34.15 10040 8246.95 8200.00 2949.09 S 4125.96 E 1793.58 33.65 10173 8346.95 8300.00 3003.84 S 4193.89 E 1826.30 32.71 10304 8446.95 8400.00 3056.98 S 4260.69 E 1857.78 31.48 10435 8546.95 8500.00 3109.95 S 4325.42 E 1888.14 30.37 10564 8646.95 8600.00 3161.75 S 4389.70 E 1917.82 29.67 10693 8746.95 8700.00 3213.13 S 4452.06 E 1946.39 28.58 10818 8846.95 8800.00 3262.36 S 4510.02 E 1972.04 25.65 10941 8946.95 8900.00 3308.92 S 4563.75 E 1994.74 22.70 11063 9046.95 9000.'00 3352.95 S 4616.48 E 2016.07 21.33 11180 9145.14 9098.19 3395.03 S 4664.14 E 2034.86 18.78 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS EMORANDUI TO: THRU: State of .-Jaska Alaska Oil and Gas Conservation Commission ChairnY0~ Blair Wondzell,'~~~,~''' P. !. Supervisor t~~-'x-/ FROM: Bobby Foste~~'' SUBJECT: Petroleum Inspector DATE: May 2, 1994 FILE NO: A2GIEBBD.doc BOPE Test - Doyon 14 ARCO - PBU - P2-54 Point Mc Intyre Field Monday,. May 2., 1.9.94: ! traveled this date to ARCO's Point Mc Intyre field and witnessed the BOPE test on Doyon rig 14. As the attached AOGCC BOPE Test Report shows there were no failures of the equipment tested. The location was fairly clear of equipment, only because of a lot of construction work, but good access to all areas of the rig and related equipmment. The rig was being cleaned up after the rig move and all equipment seemed to be in good working order. Summa~: I witnessed the BOPE Test on Doyon 14, drilling ARCO's P2-54 - test time 2.5 hours - no failures. Attachment: A2GIEBBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DOYON Rig No. 14 PTD # ARCO Rep.: P2-59 Rig Rep.: 10.75 Set @ 3,940 Location: Sec. X Weekly Other 94-59 DATE: 5/2/94 Rig Ph.# 65g - 4510 DON WESTER MORT HEA VIRLAND 14 T. 12N R. 14E Meridian U , Test MISC. INSPECTIONS: Location Gen.: OK Housekeeping: 'OK (Gen) Reserve Pit ~ lA FLOOR SAFETY VALVES: Ouan. Well Sign OK Upper Kelly / IBOP 1 Dd. Rig OK Lower Kelly / IBOP ' '1 500t5000 Ball Type I 500t5000 Inside BOP I 500~5000 BOP STACK: Quan. Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves 3 HCR Valves 2 Kill Line Valves 3 Check Valve Test Pressure 500/3000 f 500~ f 500~5000 500t5000 500t5000 500~5000 500t5000 Pressure P/F 500t5000 P MUD SYSTEM: Visual Alarm Tdp Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Gas Detectors "/~0 TE OK P P P/F Test P CHOKE MANIFOLD: Pressure P/F P No. Valves 14 500~5000 P P No. Flanges 30 500~5000 P P Manual Chokes I P P Hydraulic Chokes P 1 ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: 4 ~ 2100 3,000 1,350 P P minutes 26 sec. minutes 52 sec. YES Remote: YES , . Psig. Number of Failures: 0 ,Test Time: 2.5 Hours. Number of valves tested 26 . Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 III I I I I I III I I Ir REMARKS: GOOD TEST Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNE~S REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: W~nessed By: BOBBY D. FOSTER FI-021L (Rev. 7/t9) A2GIEBBD.XLS MEMORANDb d TO: THRU: FROM: David John~, Chairmaff~ Blair Wondzell, ~ P. I. Supervisor Jerry Herring, ~~ Petroleum Inspector State o, Alaska Alaska Oil and Gas Conservation Commission DATE: May 1, 1994 FILE NO: e2gkd3bd.doc SUBJECT: Diverter Test, Doyon 14 ARCO, P2-54 PTD # 94-59 Friday. April 29, 1994: ! traveled to ARCO's Pt. Mclntyre field to witness a diverter function test on Doyon 14 drilling well P2-54. The Diverter System Inspection Report is attached. No problems were encountered during the function test. I found the rig and pad to be in good condition. All equipment functioned properly. Summa....ry: ! witnessed a successful diverter function test on Doyon 14. Attachment: e2gkd3bd.xls ..... , STATE OF ALASKA ALASKA ~..._ AND GAS CONSERVATION COl. Diverter Systems Inspection Report Operation: Drig Contractor: DOYON DRILLING Rig No. Operator: ARCO Oper. Rep.: Well Name: P2-54 Rig Rep.: Location: Sec. 14 T. 12 N. R. 14 E. ,, ~SSlON Development 14 PTD # Date: 4/29/94 X Exploratory: 94-59 Rig Ph. # 659-4510 DON WESTER MORT HEAVERLAND Merdian UMIAT MISC. INSPECTIONS: Location Gen.: OK Well Sign: OK Housekeeping: OK (Gen.) Drlg. Rig: OK =- Reserve Pit: N/A Flare Pit: N/A DIVERTER SYSTEM INSPECTION: Diverter Size: 20 in. Divert VaNe(s) Full Opening: Yes VaNe(s) Auto & Simultaneous: Yes Vent Line(s) Size: 16 in. Vent Line(s) Length: 40 f. Line(s) Bifurcated: No Line(s) Down VVind: Yes Line(s) Anchored: Yes Turns Targeted / Long Radius: N/A ACCUMULATOR SYSTEM: Systems Pressure: 3,000 psig Pressure After Closure: 1,700 psig 200 psi Affained-Affer Closure: - - 0 ..... min: ...... 29 ..... sec:*- Systems Pressure Attained: 2 min. 52 sec. Nitrogen Bottles: (4;) BOTTLES 2150 (AVE.) psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: OK OK Mud Pits: OK OK Flow Monitor: OK OK GAS DETECTORS: Light Alarm Methane OK OK Hydrogen Sulfide: OK OK NORTH Prevailing Wind Direction Northeast to Southwest 16" Hydraulically Operated Full Opening Knife Valve Motor, Pits, Pipe Shed Complex 20" Annular Preventer 16" Vent Line ! Rig & Sub Base - , Non Compliance Items None Repair Items W'rthir Remarks: N/A Day (s) And contact the Inspector @ 659-3607 Distribution orig. - Well File c - Oper/Rep c - Database c - Trip Rpt File c- Inspector AOGCC REP.: E2GKD3BD.XLS ALASKA OIL AND GAS CONSERVATION COMMISSION .WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 13, 1994 Adrian Cl'ark Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point McIntyre P2-54 ARCO Alaska, Inc. Permit No: 94-59 Sur. Loc. 550'SNL, 1233'EWL, Sec. 14, T12N, R14E, UM Btmhole Loc. 1228'NSL, 875'EWL, Sec. 13, T12N, R14E, UM Dear Mr. Clark: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill dOes not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. Chairman BY ORDER OF THE dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 ila. Type of work Drill [] RedrillFlllb. Type of well. Exploratoryr-] Stratigraphic Test [] Development Oil[] Re-Entry [] Deepenr"l! Service [] Development Gas [] Single Zone [] Multiple Zone [] :2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE = 46.05 feet Point Mclntyre 3. Address 6. Property Designation P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 34624 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 550' SNL, 1233' EW/_, SEC. 14, T12N, R14E Point Mc/ntyre At top of productive interval 8. Well number Number 1462' NS/_, 546' EWL, SEC. 13, T12N, R14E P2-54 U-630610 At total depth 9. Approximate spud date Amount 1228'NSL, 875' EWL, SEC. 13, T12N, R14E 5/2/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa,dWD)  line prop L 365548-4050' feet P2-55-13'@ 650'MD feet 2560 11416'MD/9227' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 2o ,,,Ac 25.035 (e)(2)) Kickoff depth 3oo feet Maximum hole angle,m¢~ o Ua×~mum surf,ce 3330 psig At total depth (TVD) 8~0~)'/4~0 psi~ 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 260 sx Arcticset 13-1/2" 10-3/4" 45.5# J-55 BTC 3872' 46' 46' 3918' 3700' 1136sxCSIIl/354sx"G"/250sxCSII 9- 7/8" 7-5/8" 29. 7# NT95HS NS CC ~ 104 74' 44' 44' 10518' 8565' 9-7/8" 7-5/8" 29.7# 13CR80 NSCC 750' 10518' 8565' 11416' 9227' 590 SX Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Intermediate 'Production A~3[-~ 3 ~1 'i99/~ Liner Perforation depth: measured /,:¥,oi~a 0:,l & Gas Cons. Cornmissio~ true vertical Anchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid progra~ Tirrje vs depth plot F"I.-, R~fraction analysis l-! Seabed report[] 20 AAC 25.050 requirements~ 21. I hereby '¢e~/~h~tlthei foregoind i~ tru¢/sC~d J:brrect to the best of my knowledge ~ Title Drillin9 Engineer Supervisor' J ' '~'/ ' ('~ Commission Use Only Permit Number IAPI number IApproval date ISee letter - Ifor other requirements Conditions'of approval Samples required [] Yes [] No Mud log required []Yes [] No Hydrogen sulfide measures [] Yes 1~ No Directional survey required [] Yes [] No Required working pressure for BOPE [] 2M; 1-13M; I~5M; r"'I10M; []15M; Other: Original Signed By by order of _Approved by David W. Johnston Commissioner tne commission Date,/,/~ Form 10-401 Rev. 12-1-85 Submit in iflicate Well Name'. P2-54/L7 Well Plan Summary Type of Well (producer or injector): PRODUCER Surface 550' FNL, 1233' FWL, SEC 14, T12N, R14E Location: Target Location: 1462' FSL, 546' FWL, SEC 13, T12N, R14E Bottom Hole 1228' FSL, 875' FWL, SEC 13, T12N, R14E Location: AFE 2C0066 Number: Rig: DOYON RIG #14 Estimated Start Date: 02MAY94 Operating days to complete: IMD: 1 11416' I ]TVD: ] 9227' I 17 II~E: 146'05' I Well Design (conventional, slimhole, etc.): SLIMHOLE LONGSTRING Formation Markers: Formation TopsMD TVD (KB) Comments T-8 3947 3721 WEST SAK 8207 6861 K-12 8396 7001 K-10 10316 8416 K-5 10479 8536 HRZ 10750 8736 KALUBIK 10797 8771 KUPARUK 10818 8786 MILUVEACH 11182 9054 ~ID 11416 9227 PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 1 Anchorage Casin[/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5g H-40 WLD 80' GL 110/110 13-1/2" 10-3/4" 45.5~ J-55 BTC 3872' 46' 3918/3700 9-7/8" 7-5/8" 29.7# NT- N9~ 750' 10518' 11416'/9227 13CR80 /8565' , 9-7/8" 7-5/8" 29.7# NT-95HS N93C 10474' 44' 10518' /8565' 'I'BG 4-1/2" 12.6# 13CR-80 N,.~T 10526' 42' 10568' Logging Program: IOpen Hole Logs: SURFACE PRODUCTION Cased Hole Logs: GR/Resistivity/Neutron/Density (From top of K-10 to TD) Gyro (After Rig Release) Mud Program-. ISpecial design I Fresh water dispersed mud to top of Kuparuk (3% KCL I considerations I through Kuparuk) I Surface Mud Properties: I SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 Intermediate Mud Properties: I Fresh / lightly dispersed Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 50 20-40 15-20 20-30 9-10 10-20 Production Mud Properties: I 3% KCL with HTHP < 15 Density PV Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 8-15 15-30 5-15 10-20 9-10 5-8 APl 10.0 15-30 15-30 8-12 <25 9-9.5 5-8 APl HTHP < 15 PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 2 RECEIVED Gas Cons. Commission Anchorage Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be install~ and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KOP: ] 300' M~ Maximum Hole Angle: Close Approach Well: 42.51° P2-55 (DRILLED/CASED. NO COMPLETION OR PERFS) The above listed wells will be secured during the close approach. Disposal: Cuttings Handling: CC2A Fluid Handling: Haul to CC2A Annular Injection: ANNULAR INJECTION IS NOT ALLOWED AT PT MC INTYRE AT THIS TIME. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 4 Anchorage P2-54/L7: .J-3/4" SURFACE CASING CEMENT PR,..,,.~RAM-BJ SERVICES CIRC. TEMP 50OF LEAD CEMENT TYPE: COLD SET III WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX #SACKS: 1166 sks (2239 cuff) TAIL CEMENT TYPE: CLASS G MIX WATER: 10.53 gps (50-65°F)Fresh THICKENING TIME: 4:30 hrs MIX WATER' 4.95 gps (50-65°F)Fresh THICKENING TIME: 4 hrs MIX WATER: 3.89 gps ADDITIVES: 2 % A-7 Calcium Chloride, .5 GHS FP-12L surfactant WEIGHT: 15.8 ppg YIELD:1.15 ft3/sx APPROX #SACKS: 354sx (407 cuft) TOP JOB CEMENT TYPE: Cold Set II WEIGHT: 14.5 ppg YIELD:0.96 ft3/sx APPROX #SACKS: 250 (235 cuff) SPACER: 50 bbls fresh water ahead of lead slurry. CEMENT VOLUME: 1. Lead slurry from 500' above shoe to surface w/80% excess. 2. Tail slurry volume 354 sx (500' + 100% excess + shoe volume). 3. Top job volume 250 sx. PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 5 RECEIVED >,., ,,, i994 .,:,.,:,,:,;:a o;! & Oas Cons. Commission Anchorage P2-b-,,L7: 7-5/8" CASING CEMENT PROGRA...-BJ SERVICES CIRC. TEMP 135° F SPACERS: Pump 20 bbls 2% KCL water, followed by 70 bbls MCS-4 with 2% KCL at 1 ppg over mudweight. Follow the spacers with cement. CEMENT TYPE: Class "G" + 2% KCL ADDITIVES: 0.85% BA-10, 0.65% FL-33 fluid loss additive, 0.2% CD-32 dispersant, 0.3% A-2, 0.3% R-1 retarder, .5 ghs FP-12L surfactant WEIGHT:15.7 ppg YIELD: 1.1 9 ft3/sx MIX WATER: 5.12 gps fresh water APPROX #SACKS: 590 sx (702 CU FT) THICKENING TIME: 4 hrs OTHER CONSIDERATIONS: Perform lab tests on mixed cemenVspacedmud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at maximum rate (12- 15 bpm). CEMENT VOLUME: Order the cement volume based on the following' . 500' above the top of SISS (Stump Island Sandstone), or 1000' above the top of Kuparuk if not present. Calculate gauge hole plus 90% excess (excess factor = 1.9) Add 32 cuff for the 80' of 7-5/8" shoe joint. Add 30 cuff for cement left in the batch mixer and lines. SISS is PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 6 ?,ECEIVED /'..'~-:i'--~ "1, 'i ~r~c. ~,,, ,;. Oas Oozes. Commission Anchorage . . . . . . . . 10. P2-54/L7 Operations Summary MIRU drilling rig. Spud well and drill 13-1/2" hole. Kick off at 300' MD and build hole angle to 42.51°, 125.41 o azimuth. Continue drilling to 3918' md / 3700' tvd. Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 9-7/8" BHA and drill 10' of new hole and perform leakoff test. Drill 9-7/8" hole to TD of 11416' md/9227' tvd. (PU LWD - real time gamma ray/resistivity and recorded CDN - logs before reach top of Kuparuk.) Short trip then POOH and LDDP. RIH with 7-5/8" 13CR x L-80 casing and cement same, displacing with 8.6 ppg seawater. Test casing to 4000 psi for 30 minutes. RIH with 4-1/2", 13CR-80 completion assembly. ND BOPE and NU tree assembly. Test tree assembly to 5000 psi. Pump tubing full of diesel plus enough more to freeze protect the annulus to 2200' tvd. Set packer. Test tubing. Test annulus. Notify STATE for witnessing of annulus test. Secure well. Release rig. POST RIG WORK 1. Run gyro. PT MC INTYRE P2-54/L7 DRLG PERMIT April 6, 1994 4:53 PM Page 7 RECEIVED r_";,xs Cons. Commission Anchorage ~/I 5/94 gOg ~m TV3 REF: WELLHE'~D VER71C~2 2EETIF~N REF; '~'ELLHEAD TiE LN 33o ". 593 2182 · 5,141 t i ! 1 I ~ 37~ ~ ~ ~ ~ ":-"lq,, -5O0 3- 533 :'::CO :533 VF__R%C~ SEC~.-!ON PL&gE: 125.41° '~_'2~..iZ.P,~NITA.'_ 'v]E'W (TRLE~ NC~,TH) SD'CE 5O3 ¢~. / DIViSIF!N ,v~ SJRVEY REF: ~'EI~LHEAD ..J , ~4%o,.., ,-- ~?-~" % '<",'d~ 4? .--,? , ~- ~ ,~ , ,% ~D irc '~z,. TVD N/S E/-' :~ iN - 0.CO° SD? 3 3N C E ~ / START ~ O.~ ~.~'~ -~u C N C ?~T C~ ~JILD 7CO 2.~ 1~.41° 733 4 S 6 D~ ~ 3Jl~ '-~ '-',.~ '.~.4:° '.~93 63 S ~ ST~T ~ ~iLD ~ 11.~ 1~.41o ~1~ !~ S ~ ST~T ~ ~ ~7.~ ~4~o ~570 ~ S 85J ~ ~ CURVE 3976 4~.57 I~ 4~o 3~ 549 S 773 T-8 ~7 4E.5:~ :~.4~o 37E~ 577 S 9:~ K-t5 ~ %73 4~.5:~ t~4:o 5~4~ ~33~ S 2873 ~EST ~ SA~ 8~7 4~.5:~ :~.47 6~ E~45 S 3t~ ' l? 4P~'o ~.4~o K-~O :03~G 42.5~o 2~.4~o 8416 ~7~ S 4~ ~ ~O~D 42.5:~ ~.4~o 8735 3241 S 4~ T~-~% / I~18 42.5!° 1~.41° 8785 3267 S 45~ ~U~ II!B~ ~2.5'.° I~.41o ~4 3410 S ~7~ 59c/'878 I RECEIVED APR 1'i i994 I CASiN~ ~q' DATA , I0 3/z ;n 3918 "2.5:° !25.47 37'33 56,5 S 79-3 .=~.~:zP. Ds~_"zzI ~--L I:v 1 , HD 11415.80 I V2 6043.03 . N/S 2501.39 S I [ E/k~ 4925.29 E Oil & Gas Cons. Commiss Anchorage C~ eo-ted By Checked By Date _/ J :Z:;' ~ - '-,, /_,!. ,, i.~ 4 i : ._; , Wp_; 5 ~4D 0- ':4'6. f':. [n';er'vm, ,_,v~ 95. 353 183° 3/~ 5/94 9 86 om ~LL!3URT[3N I_.212° ~ST ~,~q'S j ~7 wsl ~.61 343.9~ O.~ ~.~ 3~.~ ~5.67 349.~ O.~ O.~ 37~.~ ~-21 ~1 ~.~ E.E4 0.~ 0.~ ~i 17.~ i ~-~ ~.~ ~.34 O.~ 0.~ 4E~.70 ~.t6 5.61 O.~ 0.~ I ~.~O ~ ~5 ~.!6 5.6! 0.~ 0,~ ~77~.~0 ~-~c 4~9.~ 2E.~ 0.~ O.~ 7~.70 ~ ~-~ ~'d ~.73 ~ ~.~ 22.37 ~.~ ~.~ 8~. lO ~-31 ~ 374.~ ~.~ [ -~ 'd~ 3~4,~ ~.~ 0.~ 0.~ ~ ~778.~0 ~-~4 ~ ~.~ EE.~ 0.~ 0.~ ~.~ ~ MdD t49.37 ~.45 I~.~ I~.~ 49.~ ~ 117:~ 19.67 ~.~ 7~.~ 17,10 74.91 I ~-~ ~9~ ~.~ 653.~ ~9,~ 240 i ~-57~!0 i~'7~ ~5,37 ~.~ ~.74 6.~0 1 ~ a~.37 ~.~ ~.~ t ~ ~_~ ~.~7 ~7~.~ om o.w ~7~,~ ~.~4 RECEIVED APR 11 1994 u:l & Gas Cons. Commission Anchorage C'~!TICAL PD!NT DATA ,~.O ins Az;. TV2 N/S RE ~ o 0900 C.,~ " O N 0 E ~ / ST~T ~ 0.~ 0,~ ST~T ~ ~ 7~ ~.~ 1~.41° 7~ 4 S 6 E ~D ~ ~ ~ 1~.~ :~.4!° I~3 63 S ~ E ST~T ~ BJ!LD ;~ tt.~ 1~.47 ElBE ~ S I~ E ~ ~ ~ 3876 42.51° t~.4t° 3~8 549 S 773 E 7-8 3~47 4a.5:° ~.4]o 37~ 577 S 8~ E K-t5 ~ ~73 4~.57 ~.4~~ 5~42 t33: S ~873 E ~ST ~ SA~ ~7 4~.5:° ]~.47 6~ ~45 S 3J~ E K-~ 8~7 4E.5]° ;~.47 7~ ~319 S ~ E K-~O ]~5 48.5:° ]~.4t° 84~6 ~7t S z~ E K-5 ~0479 4E.57 ~.4~ K~ I07~ 48.51° 1~.4~° 8771 ~ S 4~ E T=-~ / t~8 4E,57 ~,4~° 87~ ~7 S 4~ E ~~ ~l~BE 4E.57 ~.4~° ~4 34~0 S 47~ E [Tc~.qe'~ N~-,e TV~ NS EW C¢;o X Cfid Y To.,"De'~ 8786 3267 S 4,5,9~ E ¢:436~F58 59::24878 TVD ND 11415.89 VS 6O4.3.03 N/S 350!.3~ E/~ 4G25.L:~ E~i:e Plo't-:ed Cr, ea'ted By Checked By Ao?oved By WELL PERMIT CHECKLIST COMPANY ./~.W INIT CLASS ~--.q~ PROGRAM: axp [] der [] redrll [] serv [] uN~T# t1~0 ON,OFF S~O~ ~ ADMINISTRATION APPR D ENGINEERING APPR DATE GEOLOGY APPR D 1. Permit fee attached ................... 2. Lease number appropriate ..... ........... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... ' 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ · 9. Operator only affected party ............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg. '9 N 17. CMT vol adequate to tie-in long string to surf csg . .~~ 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. Y~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate .......... ~ N 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ~ psig.~ N t.- 27. Choke manifold complies w/API RP-53 (May 84) ....... ~7~/~ 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............. Y 30. Permit can be issued w/o hydrogen sulfide measures .... 31. Data presented on potential overpressure zones ..... 32. Seismic analysis 9f shallow gas zones ......... /Y N 33. Seabed condition survey (if off-shore) ....... / . Y N 34. Contact name/phone for weekly progress reports . ./ . . Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: BEW D~ Comments/Instructions: HOW~o - A:~FORMS~cheldist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . * ....... SCHLUMBERGER ....... . ****************************** RECEIVEO JUL 1 1 1997 Oil & Gas ~on~. Gon~on An~orage COMPANY NAME : ARCO ALASKA, INC. WELL NAME : 2A-18 FIELD NAME : KUPARUK RIVER UNIT BOROUGH · NORTH SLOPE STATE : ALASKA API NUMBER : 50-103-20220-00 REFERENCE NO : 97284 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/07/ 1 ORIGIN : FLIC REEL NAME : 97284 CONTINUATION # : PREVIOUS REEL : COMPiF2VT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/07/ 1 ORIGIN : FLIC TAPE NAME : 97284 CONTINUATION # : 1 PREVIOUS TAPE : CONkS_irT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00 TAPE HEADER KUPARUK RIVER UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION BIT RUN 1 97284 SECTION: TOWNSHIP: RANGE: FNL : FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 2A-18 501032022000 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 1 -JUL-97 BIT RUN 2 BIT RUN 3 13 liN 8E 736 227 135.00 135.00 94.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 16.000 121.0 9.625 3004.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 3RD STRING PRODUCTION STRING THIS IS A DEPTH CORRECTED MWD GR. THE GAk~4A RAY (GR) AND RATE OF PENETRATION (ROP) WERE INTERPOLATED TO FILL DATA GAPS. NOTE: THE MWD GR AND ROP DATA WAS ACQUIRED ON 15-MAY-95. THE BASE GA~VIA RAY (GRCH. CET) WAS ACQUIRED ON 15-0CT-95 AND WAS DIGITIZED FROM FIELD PRINTS ON 27-JUN-97. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE ' FLIC VERSION ' O01CO1 DATE · 97/07/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 1 EDITED MERGEDMWD Depth shifted, clipped, & interpolated curves; 1 bit run. DEPTH INCREMENT: O. 5000 FILE SUN~4ARY LDWG TOOL CODE SLWD $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 6190.0 2994.0 BASELINE DEPTH 88888.0 6121.5 6106.0 6103.0 6100.0 6094.0 6091.0 6089.0 6086.0 6084.0 6083.0 6079.5 6066.5 6063.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... MWD 88884.0 6117.5 6102.0 6099.5 6096.0 6086.0 6084.5 6082.0 6079.0 6077.0 6076.0 6072.5 6059.5 6056.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: 6060.0 6056.0 6054.0 6051.0 6047.5 6045.0 6043.0 6041.0 6033.0 6024.0 6022.0 6015.0 6001.0 5998.0 5995.5 5991.0 5979.0 5974.0 5970.5 5960.0 5955.5 5951.0 5947.0 5937.0 593 O. 0 5902.0 5891.0 5889.0 5887.0 5869.0 5849.0 5839.0 5822.0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE SLWD $ RE~KS: 6053.0 6049 0 6047 0 6042 5 6040 5 6038 0 6036 5 6034.0 6026.0 6017.0 6015.0 6006.5 5993.0 5990.5 5987.5 5981.5 5971.0 5967.0 5962.5 5950.5 5945.5 5943.0 5940.5 5929.5 5923 5 5894 5 5884 0 5882 0 5880 5 5863 0 5841.5 5831.0 5815.0 93.0 BIT RUN NO. MERGE TOP MERGE BASE 1 2994.0 6190.0 THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRIN.MWD (FROM 15-MAY-95) TO GRCH. CET (FROM 15-0CT-95). THE RATE OF PENETRATION (ROP) WAS CARRIED WITH THE GRIN SHIFT. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~E SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRRWMWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000 GRIN MWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CET GAPI O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 6658.000 GRRW. MWD -999.250 GRIN. MWD -999.250 ROP.MWD GRCH. CET 46.201 DEPT. 2994.000 GRRW. MWD 51.400 GRIN. MWD 51.400 ROP.MWD GRCH. CET -999.250 -999.250 223.400 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 97/07/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE . 97/07/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE StC~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 6194.0 3001.0 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ BOREHOLE AND CASING DATA 15-MAY-95 MEMORY 6194.0 3001.0 6194.0 TOOL NUMBER ........... LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 121.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 1 snd NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: GAPS IN MWD GR DATA ARE CAUSED BY HIGH ROP. THIS IS THE RAW MWD GR AND ROPE DATA FOR BIT RUN #1. $ LIS FO.~AT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRRW RW1 AAPI O0 000 O0 0 2 1 1 4 68 0000000000 GRIN RW1 AAPI O0 000 O0 0 2 1 1 4 68 0000000000 ROPE RW1 FPHR O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 6194. 000 GRRW. RW1 -999. 250 GRIN. RW1 -999. 250 ROPE. RW1 DEPT. 3001. 000 GRRW. RW1 51 . 400 GRIN. RW1 51 . 400 ROPE.RW1 -999.250 223.400 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/07/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/07/ 1 ORIGIN : FLIC TAPE NAM~ : 97284 CONTINUATION # : 1 PREVIOUS TAPE : COMI4ENT ' ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-JUL-1997 15:07 PAGE: **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/07/ 1 ORIGIN : FLIC REEL NAME · 97284 CONTINUATION # : PREVIOUS REEL : COM~iENT : ARCO ALASKA INC., KUPARUK 2A-18, API #50-103-20220-00 · ALASKA COMPUTZNG CENTER * · SCHLUMBERGER * COMPANY NAME : ARCO ALASKA, ZNC. WELL NAME : P2-54 FZELD NAME : POZNT MCZNTYRE BOROUGH : NORTH SLOPE STATE : ALASKA APZ NUMBER : 50-029-22470-00 REFERENCE NO : 94190 LTS Tape Verification List, lng Schlumberger Alaska Comput, ing Cent, er 6-JUN-1994 13'52 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 94/06/ 6 ORIGIN : FLIC REEL NAME : 94190 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-54,50-029-22470-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 94/06/ 6 ORIGIN : FLZC TAPE NAME : 94190 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC.,POINT MCINTYRE, 2P-54,$0-029-22470-00 TAPE HEADER POINT MCINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA P2-54 500292247000 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 3-JUN-94 BIT RUN 1 BIT RUN 2 BIT RUN 3 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 94190 ST. AMOUR 1ST STRING 2ND STRING 14 12N 14E 55O 1233 46.95 45.95 11.20 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 10.750 3940.0 PAGE' LIS Tape Verification Listing Schlumberger Alaska Computing Center 3RD STRING PRODUCTION STRING REMARKS: 6-JUN-1994 13:52 FIELD REMARKS DEN TO BIT: 106.90' NEUT TO BIT: 113.84' DRLLING INTERVAL: 10706' TD 11181' WASHDOWN INTERVAL: 10268' TO 10705' -- GR PROVIDED BY SPERRY-SUN LOGGING TOOL -- MAXIMUM DEV.: 43.33 DEG ~ 8493.5 FT TIME WELL TO: 06:0S lO-MAY-94 LIS FORMAT DATA **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 001C01 DATE : 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : PAGE: FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH CDN 10244.0 11181.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA [MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH MERGED DATA SOURCE LDWG TOOL CODE BIT RUN NO. MERGE TOP MERGE BASE CDN CDN $ 1 10244.0 10706.0 2 10705,0 11181.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 6-JUN-1994 13'52 REMARKS: NO DEPTH SHIFTING WAS DONE BECAUSE, AS PER JAMES DEAL, NO CASED HOLE LOGS WERE PLANNED TO TIE INTO. MERGED DATA WAS AN INITIAL UPHOLE MAD PASS AND A DRILLING PASS. OR PROVIDED BY SPERRY-SUN LOGGING TOOL. LAST DATA FOR CON TOOL AT 11074', GAMMA RAY RUN DEEPER. LIS FORMAT DATA PAGE' ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE' APZ APZ APZ APZ FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 599443 O0 000 O0 O' 1 1 1 4 68 0000000000 RHOB MWD G/C3 5994.4,3 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO MWD G/C3 599443 O0 000 O0 0 I I 1 4 68 0000000000 PEF MWD BN/E 599443 O0 000 O0 0 1 1 I 4 68 0000000000 CAEN MWD ZN 599443 O0 000 O0 0 I I I 4 68 0000000000 NPHI MWD PU-S 599443 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR 599443 O0 000 O0 0 1 I I 4 68 0000000000 GR MWD GAPI 599443 O0 000 O0 0 1 1 I 4 68 0000000000 NCNT MWD CPS 599443 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT MWD CPS 599443 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verifica%ion Lis%lng Schlumberger Alaska Compu%ing Cen%er ** DATA DEPT. 11181.000 RHOB.MWD CALN.MWD -999.250 NPHI.MWD NCNT.MWD -999.250 FCNT.MWD DEPT. 11000.000 RHOB.MWD CALN.MWD 9.131 NPHI.MWD NCNT.MWD 256.125 FCNT.MWD DEPT. 10244.000 RHOB.MWD CALN.MWD -999.250 NPHI.MWD NCNT.MWD -999.250 FCNT.MWD 6-JUN-1994 13:52 -999.250 DRHO.MWD -999.250 ROP.MWD -999.250 2.713 DRHO.MWD 24.100 ROP.MWD 6.333 -999.250 DRHO.MWD -999.250 ROP.MWD -999.250 -999.250 20.471 -0.029 46.896 -999.250 -999.250 PEF.MWD GR.MWD PEF.MWD GR.MWD PEF.MWD GR.MWD PAGE: -999.250 -999.250 3.892 35.023 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE - 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MAD Curves and log header da%a for each bi% run in separa%e BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH CDN $ LOG HEADER DATA 10244.0 10734.0 files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 6-JUN-1994 13:52 DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BO]TOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 11-MAY-94 FAST 2.3D MEMORY 11181.0 10268.0 11181.0 43 . 3 TOOL NUMBER CDN $ NEUTRON/POROSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): NDSO55 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 9.875 3940.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 9.80 155.0 2. 420 I . 960 76.0 69.0 REMARKS: SANDSTONE 2.65 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): I. 688 ************ RUN I ************* MAD PASS 10244~ - 10734~ CDN/GR ONLY GR PROVIDED BY SPERRY-SUN LOGGING TOOL SPERRY-SUN GAMMA RAY RECORDED WITH INDEPENDENT DEPTH SYSTEM BIT TO DEN: 106.90; BIT TO NEUT: 113.84 MAXIMUM DEV: 43.3 DEG AT 8493.5 FT TD WELL 06:05 lO-MAY-94 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center LIS FORMAT DATA 6-JUN-1994 13'52 PAOE' ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 599443 O0 000 O0 0 2 1 1 4 68 0000000000 RHOB LW1 G/C3 599443 O0 000 O0 0 2 1 1 4 68 0000000000 DPHI bWl PU 599443 O0 000 O0 0 2 1 1 4 68 0000000000 DRHO LWl G/C3 599443 '00 000 O0 0 2 I I 4 58 0000000000 PEF LW1 BN/E 599443 O0 000 O0 0 2 1 I 4 68 0000000000 DCAL LW1 IN 599443 O0 000' O0 0 2 1 1 4 68 0000000000 TNPH bWl PU 599443 O0 000 O0 0 ' 2 1 1 4 68 0000000000 ROPE LW1 F/HR 59944-3 O0 000 O0 0 2 1 1 4. 68 0000000000 GR bWl GAPI 599443 O0 000 O0 0 2 1 1 4 68 0000000000 HENA LW1 CPS 599443 O0 000 O0 0 2 1 1 4 68 0000000000 HEFA LW1 CPS 599443 O0 000 O0 0 2 1 1 4 68 0000000000 TABD LW1 HR 599443 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center DEPT. 10734.000 RHOB.LW1 PEF.LW1 -999.250 DCAL.LW1 GR.LW1 -999.250 HENA.LW1 6-JUN-1994 13'52 -999.250 DPHZ.LWl -999.250 TNPH.LW1 -999.250 HEFA.LW1 -999.250 DRHO.LWl -999.250 ROPE.LWl -999.250 TABD.LW1 PAGE' -999.250 71.145 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 001C01 DATE : 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MAD Curves and log header data for each bit run in separate BIT RUN NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH CDN 10593.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) 11181.0 11-MAY-94 FAST 2.3D MEMORY 11181.0 10268.0 11181.0 files. LIS Tape Verification Listing Schlumberger Alaska Compu%ing Center 6-JUN-1994 13'52 MINIMUM ANGLE' MAXIMUM ANGLE' TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 43.3 TOOL NUMBER CDN $ NEUTRON/POROSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)' DRILLERS CASING DEPTH (FT)' NOS055 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 9.875 3940.0 NEUTRON TOOL MATRIX' MATRIX DENSITY' HOLE CORRECTION (IN)' 9.80 155.0 2. 420 1. 960 76.0 69.0 REMARKS · SANDSTONE 2.65 TOOL STANDOFF (IN)' EWR FREQUENCY (HZ)' 1. 688 ************ RUN 2 ************* DRILLED INTERVAL 10706' - 11181~ WASHDOWN INTERVAL 10268' TO 10706' CDN/GR RUN ONLY GR PROVIDED BY SPERRY-SUN LOGGING TOOL SPERRY-SUN GAMMA RAY RECORDED WITH INDEPENDENT DEPTH SYSTEM. BlT TO DEN: 106.90; BlT TO NEUT: 113.84, MAXIMUM DEV: 43.3 DEG AT 84,93.5 FT TD WELL 06:05 lO-MAY-94 $ LIS FORMAT DATA PAGE' LIS Tape Verifica%ion Lis%lng Schlumberger Alaska Compu%ing Cen%er 6-JUN-1994 13:52 ** DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 o.s 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 599443 O0 000 O0 0 3 1 1 4 68 0000000000 RHOB LW2 G/C3 599443 O0 000 O0 0 3 1 1 4 68 0000000000 DPHI LW2 PU 599443 O0 000 O0 0 3 1 1 4 68 0000000000 DRHO LW2 G/C3 599443 O0 000 O0 0 3 1 I 4 68 0000000000 PEF LW2 BN/E 599443 O0 ,, 000 O0 0 3 1 1 4 68 0000000000 DCAL LW2 IN 599443 O0 000 O0 0 3 1 I 4 68 0000000000 TNPH LW2 PU 599443 O0 000 O0 0 3 1 1 4 68 0000000000 ROPE LW2 F/HR 599443 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPZ 599443 O0 000 O0 0 3 I I 4 68 0000000000 HENA LW2 CPS 599443 '00 000 O0 0 3 I I 4 68 0000000000 HEFA LW2 CPS 599443 O0 000 O0 0 3 i I 4 68 0000000000 TABD LW2 HR 599443 O0 000' O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 11181.000 RHOB.LW2 PEF.LW2 -999.250 DCAL.LW2 GR.LW2 -999.250 HENA.LW2 DEPT. 11000.000 RHOB.LW2 PEF.LW2 3.892 DCAL.LW2 GR.LW2 35.023 HENA.LW2 -999.250 DPHI.LW2 -999.250 TNPH.LW2 -999.250 HEFA.LW2 2.713 DPHI.LW2 0.631 TNPH.LW2 256.125 HEFA.LW2 -999.250 DRHO.LW2 -999.250 ROPE.LW2 -999.250 TABD.LW2 -3.800 DRHO.LW2 24.100 ROPE.LW2 6.333 TABD.LW2 -999.250 20.471 -999.250 -0.029 46.896 5.646 LIS Tape Verifica%ion List, ing Schlumberger Alaska Comput, ing Cen%er 6-JUN-1994 13'52 PAGE' 10 DEPT. 10593.000 RHOB.LW2 PEF.LW2 -999.250 DCAL.LW2 GR.LW2 90.768 HENA.LW2 -999.250 DPHI.LW2 -999.250 TNPH.LW2 -999.2S0 HEFA.LW2 -999.2S0 DRHO.LW2 -999.250 ROPE.LW2 5.113 TABD.LW2 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 94/06/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 94/06/ 6 ORIGIN : FLZC TAPE NAME : 94190 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-54,$0-029-22470-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 94/06/ 6 ORIGIN : FLIC REEL NAME : 94190 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, INC.,POINT MCZNTYRE, 2P-S4,50-029-22470-00