Re: Regulatory Cost Charges for Fiscal ) Other Order 203
Year 2024. ) December 5, 2023
IT APPEARING THAT:
1. On October 26, 2023, pursuant to 20 AAC 25.615 the Alaska Oil and Gas Conservation
Commission (AOGCC) gave written notice of proposed fiscal year 2024 regulatory cost
charges under AS 31.05.093 to operators subject to those charges.
2. Notice of public hearing on the proposed fiscal year 2024 regulatory cost charges was
published and notice was sent to all the parties who will be responsible for paying a portion
of the regulatory cost charge on October 26, 2023.
3. By email, persons subject to the regulatory cost charge were sent notice of the proposed
regulatory cost charges for fiscal year 2023. No comments were submitted and no revisions
to the proposed charges were requested.
4. A public hearing was held on November 30, 2023.
FINDINGS:
1. The appropriation made for the operating costs of the AOGCC for this fiscal year
is $8,393,300.00.
2. Federal receipts of $170,000.00 are allotted for the oversight of Class II wells under the
Safe Drinking Water Act Underground Injection Control Program and reduce the
regulatory cost charges for this fiscal year.
3. The lapsed amount of the fiscal year 2023 appropriation that is included to reduce the
regulatory cost charges in this fiscal year's appropriation under AS 31.05.093(d)
is $781,937.30.
4. The amounts constituting VOP under 20 AAC 25.605(a) for the operators subject to a fiscal
year 2024 regulatory cost charge are as follows:
OPERATOR VOP In Bbl
AIX Energy, LLC 206,856
Amaroq Resources, LLC 18,571
Bluecrest Alaska Operating, LLC 379,067
ConocoPhillips Alaska, Inc. 368,695,791
Cook Inlet Energy, LLC 2,254,172
Cook Inlet Natural Gas Storage Alaska, LLC 1,824,777
Eni US Operating Co. Inc. 44,507,645
Furie Operating Alaska, LLC 730,636
Hilcorp Alaska, LLC 324,024,369
Hilcorp North Slope, LLC 1,932,922,242
North Slope Borough 254,176
Vision Operating, LLC 189,180
Other Order 203
December 5, 2023
Page 2 of 2
CONCLUSIONS:
1. Using the formula set out in 20 AAC 25.605, the fiscal year 2024 regulatory cost
charges for the operators subject to those charges are as follows:
OPERATOR FINAL RCC
AIX Energy, LLC $575.22
Amaroq Resources, LLC $51.64
Bluecrest Alaska Operating, LLC $1,054.10
ConocoPhillips Alaska, Inc. $1,025,258.38
Cook Inlet Energy, LLC $6,268.34
Cook Inlet Natural Gas Storage Alaska, LLC $5,074.29
Eni US Operating Co. Inc. $123,765.55
Furie Operating Alaska, LLC $2,031.73
Hilcorp Alaska, LLC $901,037.41
Hilcorp North Slope, LLC $5,375,013.17
North Slope Borough $706.80
Vision Operating, LLC $526.07
2. Appropriate payment dates under 20 AAC 25.620 are December 30, 2023, February
10, 2024, and April 14, 2024. No later than each payment date, a person subject to a
regulatory cost charge shall pay one-third of the difference between the person’s
regulatory cost charge and any estimated regulatory cost charge previously paid for the
fiscal year, except that a regulatory cost charge may be prepaid, in part or in whole, at
any time.
NOW THEREFORE IT IS ORDERED that the operators listed in the Conclusion of this Order
shall pay their respective regulatory cost charges as required by this Order.
DONE at Anchorage, Alaska and dated December 5, 2023.
Jessie L. Chmielowski Gregory C. Wilson
Commissioner Commissioner
RECONSIDERATION AND APPEAL NOTICE
As provided in AS 31.05.080(a), within 20 days after written notice of the entry of this order or decision, or such further time as the AOGCC grants for good cause shown, a person affected by it
may file with the AOGCC an application for reconsideration of the matter determined by it. If the notice was mailed, then the period of time shall be 23 days. An application for reconsideration
must set out the respect in which the order or decision is believed to be erroneous.
The AOGCC shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed. Failure to act on it within 10-days is a denial of reconsideration. If the
AOGCC denies reconsideration, upon denial, this order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST be filed within 33
days after the date on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the order or decision denying reconsideration, UNLESS the denial is by inaction, in which case
the appeal MUST be filed within 40 days after the date on which the application for reconsideration was filed.
If the AOGCC grants an application for reconsideration, this order or decision does not become final. Rather, the order or decision on reconsideration will be the FINAL order or decision of the
AOGCC, and it may be appealed to superior court. That appeal MUST be filed within 33 days after the date on which the AOGCC mails, OR 30 days if the AOGCC otherwise distributes, the
order or decision on reconsideration.
In computing a period of time above, the date of the event or default after which the designated period begins to run is not included in the period; the last day of the period is included, unless it
falls on a weekend or state holiday, in which event the period runs until 5:00 p.m. on the next day that does not fall on a weekend or state holiday.
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2023.12.05 14:42:44
-09'00'
Gregory Wilson Digitally signed by Gregory
Wilson
Date: 2023.12.05 14:52:16 -09'00'