Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
194-040
Pages NOT Scanned in this Well History File · XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE RESCAN [] Color items. Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED Logs of various kinds [] Other Complete COMMENTS: Scanned by~ TO RE-SCAN Notes: Dianna Vincent Nathan Lowell Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: /si _ STATE OF ALASKA . ALASKAleILAND GAS CONSERVATION COM SION RECEI"ED WELL COMPLETION OR RECOMPLETION REPORT AND LOG " V ~. FES I 7 2006 1a. Well Status: D Oil DGas D Plugged 1m Abandoned D Suspended DWAG 11U88ki10ifaasGas ilì~ Coo- . . 20AAC25.105 20AAC 25.110 D DeveloP~h Exp(orâWiýSIOn DGINJ DWINJ D WDSPL No. of Completions Zero Other D S'ttatigra .rvice 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 11/12/2005 194-040 305-318 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 04/02/1994 50- 029-22459-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 04/14/1994 PBU 13-31 1579' FSL, 1423' FEL, SEC. 14, nON, R14E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 82.3' Prudhoe Bay Field I Prudhoe Bay 272' FSL, 3218' FEL, SEC. 15, T10N, R14E, UM Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 263' FSL, 3343' FEL, SEC. 15, T10N, R14E, UM 12062 + 9045 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+ TVD) 16. Property Designation: Surface: x- 685803 y- 5931612 Zone- ASP4 12150 + 9109 Ft ADL 028314 ~--------- ------------ ---------- 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 678764 y- 5930134 Zone- ASP4 --- ------- N/A MD Total Depth: x- 678638 y- 5930122 Zone- ASP4 ___________n ---- --- ____nn~n_n__n___ __ -- --- -------+--- 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 1m No NI A MSL 1900' (Approx.) 21. Logs Run: MWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING EPTH MD SETTING [ EPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE lOP tsoTTOM lOP tsoTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 32' 112' 32' 112' 30" 260 sx Arctic Set (Approx.) 9-5/8" 47# L-80 33' 3527' 33' 3244' 12-1/4" 880 sx CS III, 375 Sx 'G', 250 sx CS II 5-112" 17# L-80 32' 12137' 32' 9100' 8-1/2" 821 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ....,.".. " ".,." G 11866' P&A with 14.5 Bbls Class 'G' :1 ......- 11854' Set Whipstock 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + OIL -BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS 8Ft 2 ; 2006 or·<1 /\1 · It:.;: J ~,j" L Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE G 28. .. GEOLOGIC MARKERS- . FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 11830' 8876' None Shublik 11860' 8898' Sadlerochit 11966' 8975' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certi~ ~hat the foregoing is true and correct to the best of my knowledge. Signed so~ewman4^JW, \....1 ~ Title Technical Assistant PBU 13-31 194-040 305-318 Prepared By Name/Number: Well Number Permit No. I Approval No. Drilling Engineer: Date O'J.f{7/0<- Sondra Stewman, 564-4750 Bryan McLellan, 564-5516 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only e e Well: Field: API: Permit: PBU 13-31 A Prudhoe Bay Field I Prudhoe Bay Pool 50-029-22456-00-00 205-106 Accept: Spud: Release: Rig: 12/08/06 12/10106 12/25/06 Nabors 4ES & Nordic 1 PRE-RIG WORK 10/21/05 DRIFT WI BRUSH & 2.625 G-RING TO 8965' SLM, WORK THROUGH RESTRICTION @ 8298' SLM RAN 2.75 GAUGE RING TO XN NIPPLE. 10/22/05 SET 3.5" XXN PLUG WIO KEYS @ 8967' SLM, CMIT TO 4000 PSi.... FAILED 10/23/05 PULL 3.5 XXN PLUG FROM XN NIPPLE @ 8974' MD. SET 2 7/8 CAT STANDING VALVE IN XN NIPPLE @ 9003' MD. CMITTXIA TO 4000 PSI; FAILED. PULLED CAT STANDING VALVE @ 8990' SLM, RAN ANOTHER CSV, CMITTXIA TO 4000 PSI PASSED. 10/24/05 FINISH POOH WI 2.0 CENT, GRICCL LOGGING TOOL. 10/29/05 T/l/O = SI/OIO PPPOT-T PASSED TO 5000 PSI, PPPOT-IC PASSED TO 3000 PSI. PRESSURE TESTED PACKOFF TO 3000 PSI. PRESSURE WAS 2900 PSI AT 15 MIN. AND 2900 PSI AT 30 MIN TEST PASSED. ALL LOCKDOWN SCREWS WERE FUNCTIONED. TESTED FALSE BOWL TO 5000 PSI PRESSURE WAS 4900 PSI AT 15 MIN. AND 4900 PSI AT 30 MIN. TEST PASSED. ALL LOCKDOWN SCREWS WERE FUNCTIONED. 11/10/05 T/l/O=30/VAC/20. TEMP=SI. TBG & IA FL'S FOR COIL. TBG FL @ 630' (6 BBLS), IA FL NEAR SURFACE. 11/12/05 MOVE IN RU CTU #5 - JOB SCOPE: CEMENT SQUEEZE PERFORATIONS 11,974-12,060 - KILL WELL - RIH WITH 1.75" DJN - TAG TO AT 12050' UP CORRECT TO 12037' SLM -DIESEL ON BS FOR POS WHP - MIX I PUMP 14.5 BBLS CLASS G CEMENT. LAY IN FROM 12,037 TO 11,414, PULL UP TO SAFETY AND APPLY PRES. TO SQUEEZE. HELD SOLID @ 1050 WHP PUMP 40 BBLS BIOZAN CONTAMINATE CEMENT TO 11,940 AND CHASE OUT OF HOLE. 11/13/05 POH CHASING BIOZAN TO SURFACE @ 80% FP WI METH TO 2500' TRAP 600 PSI ON WELL. 11/14/05 DRIFTED WI 2.70 CENT & SIB TO XO @ 8968' SLM +7' CORR = 8975' MD (TIGHT SPOT @ 8301' SLM) DRIFTED WI 1.90 CENT & SIB TO TOC @ 11,489' SLM- 11,496' CORRECTED( APPROX 454' HIGH) 11/15/05 PRESSURED TESTED CEMENT TOP TO 2300#, RE TAG TOP OF CEMENT IN SAME SPOT @ 11,489' SLM - 11,496' CORRECTED, SAMPLE OF CEMENT IN BAILER. 11/16/005 RIH WI 2.65" JET CUTTER BUT COULD NOT GET PAST RESTRICTION AT 8300'. SWITCH TO CHC. RIH WITH STRING SHOT FIRED STRINGSHOT FROM 8950'-8962' WILL RETURN TO PERFORM TUBING PUNCH AND CHEMICAL CUT. 13-31 A Page 2 -- e 11/19/05 JOB OBJECTIVE WAS TO SHOOT A CHEMICAL CUTTER @ 8958' 1/TUBING PUNCHER WAS SHOT FROM 8900' TO 8902' TO EQUALIZE TUBING & IA 21 CHEMICAL CUTTER WAS RIH BUT CAME TO RESTRICTION IN WELL @ 8300' AND COULD NOT DESCEND PAST IT. MADE A COUPLE OF ATTEMPTS BUT DID NOT WANT TO WORK CHEM CUTTER TOO HARD. POOH. TEMPERATURE @ 19:30 FOUND TO BE -40DEG F AMBIENT, 11/21/06 RAN 2 318" DUMMY GUN AND 2.5" SWAGE AND SET DOWN @ 8269'SLM. RAN 2.5" SWAGE, 2' OF 17/8", 2.60 SWAG BOBBLED THRU, HAD TO OVER PULL TO GET BACK UP THRU RAN 2.6" SWAGE, 2' X 1 7/8", 2.725"SWAGE. 11/22/05 RAN 2.6" SWAGE, 2' X 17/8",2.725" SWAGE.BOBBLED THRU, HAD TO OVER PULL TO GET BACK UP THRU RAN 2.5 DUMMY GUN, SET DOWN @ 8282'SLM. UNABLE TO MAKE HOLE ATTEMPTED TO GET TO SHOOT DEPTH OF 8958' TO SHOOT 23/8" CHEMICAL CUTTER BUT COULD NOT DESCEND PAST RESTRICTION @ 8308', (PRE RWO) NEW TUBING CUT DEPTH GIVEN AT 15' ABOVE RESTRICTION RAN IN WITH STRING SHOT TO CLEAN TUBING AROUND CUT DEPTH STRING SHOT INTERVAL = 8289' - 8299' RAN IN WITH 2 3/8" CHEMICAL CUTTER, SAT DOWN AT RESTRICTION AND PULLED UP TO SHOOT DEPTH NO COLLARS OR JEWELERY TO TIE INTO DUE TO COILED TUBING COMPLETION CHEMICAL CUTTER CCL STOP DEPTH = 8281.8' CHEMICAL CUTTER SHOOT DEPTH = 8293' 11/23/05 T/l/O= 100/425/0 CIRC OUT. PUMPED 5BBLS METH, 289BBLS 1%KCL, 45BBLS DIESEL, DOWN TUBING, UP lA, DOWN 13-32'S FLOWLINE. U-TUBE FREEZE PROTECT. FREEZE PROTECT FLOWLINE W/86 BBLS DIESEL. FWHP'S = 01010 11/24/05 SET 4" CIW BPV API VALVESHOP 11/25/05 T/l/O = 01010 TESTED COIL TUBING HANGER TO 5000 PSI. PRESSURE WAS 5000 PSI AT 15 MIN. AND 5000 PSI AT 30 MINUTES. TEST PASSED. LOCKDOWN SCREWS WERE FUNCTIONED AND TORQUED TO 450 FT LBS. Page 1 of 5 BP EXPLORATION Operations Summary Report Start: 11/25/2005 Rig Release: 12/6/2005 Rig Number: 4ES Phase I Legal Well Name: 13-31 Common Well Name: 13-31 Event Name: WORKOVER Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 4ES ____~_at~._ _J_~~~~_~_~~i__HO~_~_S i _Task Code NPT 11/25/2005 10:00 - 12:00 2.00 MOB 12:00 - 00:00 12.00 MOB 11/26/2005 00:00 - 20:30 20.50 MOB 20:30 - 22:00 1.50 RIGU P P P P PRE PRE PRE PRE 22:00 - 00:00 2.00 KILL P DECOMP 11/27/2005 00:00 - 00:30 0.50 KILL P DECOMP 00:30 - 01 :00 0.50 KILL P DECOMP 01 :00 - 03:00 2.00 KILL P DECOMP 03:00 - 04:30 1.50 WHSUR P DECOMP 04:30 - 07:00 2.50 BOPSU P DECOMP 07:00 - 07:30 0.50 BOPSU P DECOMP 07:30 - 11 :30 4.00 BOPSU P DECOMP 11 :30 - 12:00 0.50 BOPSU P DECOMP 12:00 - 14:00 2.00 PULL P DECOMP 14:00 - 14:30 0.50 PULL P DECOMP 14:30 - 18:00 3.50 PULL P DECOMP 18:00 - 20:00 2.00 PULL P DECOMP 20:00 - 00:00 4.00 PULL P DECOMP 11/28/2005 00:00 - 06:00 6.00 PULL P DECOMP 06:00 - 06:30 0.50 PULL P DECOMP 06:30 - 11 :30 5.00 PULL P DECOMP 11 :30 - 12:30 1.00 PULL DECOMP P 12:30 - 13:00 13:00 - 14:00 0.50 FISH 1.00 FISH DECOMP DECOMP P P Spud Date: 4/2/1994 End: Description of Operations Scope and Lower Derrick Move Rig from MPH-18 to GPB DS-13-31 Continue with Rig move. Move on GPB - DS 13-31 MIRU Primary Unit. Raise and Scope Derrick. Accept rig at 22:00 hrs. RIU Tiger Tank and lines to tree. Install 2nd valve. Take on sea water. Pull BPV. Test Kill Lines to 3500 psi. Pre-Job Safety Meeting all personnel on Kill Well Procedure. Check Pressures: Tbg 0 psi and Csg. 0 psi. Circulate Hot 140 degree seawater at 3 bpm/300 psi 200 bbls. Returns clean. Monitor Well. Tbg 0 psi and Csg. 0 psi. Set TWC. Test same 1000 psi. NID Tree. NORM Tree and send to Valve Shop. NU BOPE. Rig-up Test Equipment. Test BOPE per BP/AOGCC requirements at 250/3,500 psi. Note BOP Stack and Pipe Rams tested at 250/4,000 psi. The State's right to witness Test was waived by C. Sheve. Rig down Test Equipment. Pick-up Lubricator. Pull TWC. Lay down same. Rig-up handling equipment and hydraulic cutters to pull, cut, and lay down 3 1/2" Coiled tubing. Hold special PJSM to discuss non-routine Operations. P/U Landing Joint made-up to Left-Hand Acme XO, BOLDS, stab and M/U into Hanger and pull 124K Ibs, 80% of CT yield, then pull to 134K, which is 80% yield plus Blocks. Slack oft and pull to 120K and Tubing came free, pull to Rig Floor wi 85K Ibs. Rehearse positions and actions of Floorhands and Driller to prepare to make the first cut below the Tubing Hanger. Make first cut and saw no surprises using the pre-established procedure. Mark Drilling Line for 17' cuts. The cut-ofts do not jump around when the shear is made. Continue POOH with no problems. Modify Dog Collar clamp. Clamp was causing damage to the bolts on the top plate of the Slip-type Eevators. Tapped out broken bolt. PJSM Rehearse positions for Driller and Floorhands pulling 3-1/2" Coiled Tubing cut into 17' sections. Continue POOH with no problems. Continue to pull and cut 3-1/2" Coiled Tubing in 17" sections. (Approx 5,100' recovered at Report time). Lub Rig. Inspect Derrick. Inspect Handling Equipment used for the 31/2" Coiled Tubing cutting operations. Finished POOH with 3 1/2" Coiled Tubing in 17' sections to the Chemical Cut made at 8,293' elmd. Made 471 cuts. The 6' chemical Cut Stub was normal OD. However, there was approx 1" of pipe wall still holding that we had to pull apart to free the String. Rig-down Hydraulic Cutter and Handling Equipment used to cut and lay down the 3 1/2" Coiled Tubing. Rig-up 2 7/8" Handling Equipment. Make-up BHA #1 as follows: ITCO Spear wlSpiral Grapple, Printed: 12/21/2005 1:56:07 PM BP EXPLORATION Operations Summary Report Page 2 of 5 legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 11/28/2005 11/29/2005 13-31 13-31 WORKOVER NABORS ALASKA DRilLING I NABORS 4ES Start: 11/25/2005 Rig Release: 12/6/2005 Rig Number: 4ES Phase I Spud Date: 4/211994 End: From - To ¡ Hours i [code , Task NPT .----.---.------ -.. ".- "..-...- --- 13:00 - 14:00 1.00 FISH P 14:00 - 19:30 5.50 FISH P 19:30 - 00:00 4.50 FISH P 00:00 - 02:00 2.00 FISH P 02:00 - 03:30 1.50 FISH P 03:30 - 04:00 0.50 FISH P 04:00 - 06:00 2.00 FISH P 06:00 - 06:30 0.50 FISH P 06:30 - 08:30 2.00 FISH P 08:30 - 09:30 1.00 FISH P 09:30 - 10:00 0,50 FISH P 10:00 - 11 :30 1.50 FISH P 11 :30 - 12:30 1.00 FISH P 12:30 - 13:00 0.50 FISH P 13:00 - 13:30 0.50 FISH P 13:30 - 17:00 3.50 FISH P 17:00 - 18:00 1.00 FISH P 18:00 - 21 :30 3.50 FISH P 21 :30 - 22:00 0.50 FISH P 22:00 - 23:00 1.00 CLEAN P Description of Operations .... .__ "__ ._n__________.__ DECOMP XO, Bumper Sub, Oil Jar, P~S, XO, 6 ea Drill collars. Start to load and tally 2 7/8" PAC Drill Pipe in Pipe Shed. DECOMP Tally 400 Jts of 2-7/8" 10.4 Ib/ft PAC Drill Pipe. Drill Pipe 10 = 2.151 "!Tool Joint 10 = 1,50" DECOMP Run In Hole BHA # 1 on 2-7/8" PAC Drill Pipe in singles. DECOMP Continue Run In Hole BHA #1 on 260 Jts of 2-7/8" PAC DP. Check parametors P/U Wt. 95K S/O Wt. 55K DECOMP M/U Jt. 261 with Circulating Hose. RIH Taged Fish at 8282' 4es KB. Attempt to Spear Fish several times (+). Saw no indication that Fish was engauged or pulled from Seal bore Receptacle. DECOMP Drop 3/4" Ball and pump open Drain Sub. DECOMP Start POOH with 2 7/8" PAC Drill Pipe standing back in Derrick and BHA #1. DECOMP Lub Rig. Inspect Derrick. DECOMP Finish POOH with 2 7/8" PAC Drill Pipe and BHA #1. DECOMP Lay down BHA #1. 31/2" Coiled Tubing Fish at surface. "Surprised we were"! DECOMP Rig-up to handle, cut, and lay down 31/2" Coiled Tubing in 17' sections. Expected remaining Fish = 693' of Coiled Tubing and Seal Assembly. DECOMP Cut and lay down remaining Coiled Tubing Fish complete. DECaMP Rig down 3 1/2" Coiled Tubing handling equipment. Clear and clean Rig Floor. DECOMP Rig-up to handling equipment for 27/8" PAC Drill Pipe. DECOMP Make-up BHA #2 as Follows: GS Spear, Bumper Sub, Oil Jar, XO, P~S, Drill Collars. DECOMP Trip in hole with BHA #2 and 2 7/8" PAC Drill Pipe. Note: Due to discovering a loose Joint on the TOOH. All Joint connections will be re-torqued on the TIH. DECOMP Tag up on fish @ 8976'. Work over fish & jar free. P/U Wt = 92K. S/O Wt = 56K. DECOMP POOH w/fish. DECOMP Break out & UD fish. Recovered XN lock, Seal Bore Recepticle, X-Over, 15' Pup, XN Nipple, 4' Pup & WLEG. TL = 32.72'. 100% recovery. Clear & clean rig floor. DECOMP P/U & M/U BHA #3 as follows: 43/4" Diamond Speed Mill, 4 3/4" Carbide Watermellon Mill, 2 7/8" Mud Motor, X-Over, 4 1/2" Stabilizer, X-Over, Circ. Valve, Bumper Sub, Oil Jars, X-Over, Pump Out Sub, 6' 2 7/8" PAC DCs. TL = 214.72'. RIH wI BHA #3 on 2 7/8" PAC DP. Con't to RIH wI BHA #3 on 2 7/8" PAC DP. 83 stands + 2 singles. Tag up @ 7992.5'. Prep to mill. Flush DP wI 36 bbls. 2 BPM @ 700 psi. Drop ball & close annular circulating valve. sheared @ 1900 psi. Establish milling parameters. Mill on SWS nipple @ 7992.5'. P/U Wt = 70K. S/O Wt = 50K. Off Bottom Press = 1500 psi. On Bottom Press = 2100 psi. Stalling @ 3000 psi. 400 RPMs, 43 SPM. Torq 700-800 Ft-LBs. DECOMP Finished Milling-out SWS Nipple to 4.750" 10. Made several wiper passes (dry) through Nipple. Nipple 10 is clean. DECOMP Continue in PAC Drill Pipe, down to the OTIS XN-Nipple at 8,976' elmd. Establish Milling prameters as follows: PUW = 23:00 - 00:00 1.00 CLEAN P DECOMP 11/30/2005 00:00 - 02:30 2.50 CLEAN P DECOMP 02:30 - 03:30 1.00 CLEAN P DECaMP 03:30 - 06:00 2.50 CLEAN P DECOMP 06:00 - 07:00 1.00 CLEAN P 07:00 - 10:30 3.50 CLEAN P Printed: 12/21/2005 1:56:07 PM Page 3 of 5 BP EXPLORATION Operations Summary Report Legal Well Name: 13-31 Common Well Name: 13-31 Event Name: WORKOVER Start: 11/25/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/6/2005 Rig Name: NABORS 4ES Rig Number: 4ES Date I From - To i HoursJ T_~_~~._:.~o_~~___~~~_I_~hase 11/30/2005 07:00 - 10:30 3.50 CLEAN P DECaMP 10:30 - 13:30 3.00 CLEAN N DFAL DECaMP 13:30 - 14:00 0.50 CLEAN N DFAL DECaMP 14:00 - 15:00 1.00 FISH N DFAL DECaMP 15:00 - 16:00 1.00 FISH N DFAL DECaMP 16:00 - 19:00 3.00 FISH N DFAL DECaMP 19:00 - 20:30 1.50 FISH N DFAL DECaMP 20:30 - 00:00 3.50 FISH N DECaMP 12/1/2005 00:00 - 00:30 0.50 FISH N DFAL DECaMP 00:30 - 01 :30 1.00 FISH N DFAL DECaMP 01 :30 - 02:30 1.00 FISH N DFAL DECaMP 02:30 - 05:00 2.50 FISH N DFAL DECaMP 05:00 - 06:00 1.00 CLEAN N DFAL DECaMP 06:00 - 06:30 0.50 CLEAN P DECaMP 06:30 - 10:00 3.50 CLEAN N DFAL DECaMP 10:00 - 10:30 0.50 CLEAN P DECaMP 10:30 - 12:30 2.00 CLEAN P DECaMP 12:30 - 14:30 2.00 CLEAN P DECaMP 14:30 - 16:30 2.00 CLEAN P DECaMP 16:30 - 17:00 0.50 CLEAN P DECaMP 17:00 - 21 :30 4.50 CLEAN P DECaMP 21 :30 - 22:00 0.50 CLEAN P DECaMP 22:00 - 23:00 1.00 CLEAN P DECaMP 23:00 - 00:00 1.00 CLEAN P DECaMP 12/2/2005 00:00 - 00:30 0.50 CLEAN P DECaMP Spud Date: 4/2/1994 End: Description of Operations 89K. sow = 57K. Pressure off bottom at 2.6 bpm/1950 psi. Pressure on bottom at 2.6 bpm/2,200 psi. Started Milling-out XN-Nipple. After -30 minutes of milling time, pressure dropped off abruptly for no expected reason? Pressure dropped off to 2.6 bpm/1 ,400 psi. Attempted to stall out Motor with 7K down weight. Tried to get Motor to "re-start". Unable to get Motor to "dig". Prep to POOH. POOH with 2 7/8" PAC Drill Pipe. Stand back in Derrick, BHA to surface. Discovered that the Oil Jars parted (??). Have 3.125" aD body of the remaining Oil Jar looking up. Order out Overshot and Grapple. Clear and clean Rig Floor. Wait on Overshot. Make-up BHA #4 as Follows: 4 1/8" Overshot w/3 1/8" Grapple, XO, Bumper Sub, Oil Jar, XO, P~S, Drill Collars. TIH with BHA #4 and 2 7/8" PAC Drill Pipe. Tag up on fish @ 8937'. P/U Wt = 92K, SIO Wt = 57K. Work down over fish & P/U wI No result. Rotate down over fish wI pump on. Pressure increased to 900 psi wI 20 SPM. Slacked off 10K, Have Fish. P/U wI 20K overpull & jar fish free. Cannot see additional weight on indicator - no drag from fish. LID circ equip. Prep to POOH. Drop ball & open Pump out sub. POOH wI BHA #4 on 2 7/8" PAC DP. Finish POOH wI BHA #4. Break out & LID BHA # 4 & Fish. Recovered 100%. Clear & clean rig floor. Service & maintain Rig. Wait on Baker tools. M/U BHA #5 as Follows: 33/4" Junk Mill, XO, 43/4" Watermelon Mill, Mud Motor, XO, Stabilizer, Xo, Circ Valve, Oil Jar, XO, P~S, Drill collars. Lub Rig. Inspect Derrick. TIH with BHA #5 and 2 7/8" PAC Drill Pipe. Note: SWS Nipple at 7,998' is clean. Passed through without a "bobble". Tag XN-Nipple at 8976' elmd. Drop Ball. Pump Ball down to shear close Annular Circulating Valve. Establish parameters as follows: PUW = 90K. SOW = 57K. Off bottom pressure = 2.5 bpm/1,600 psi. On bottom pressure = 2.25/2,200 pai. Stall pressure = 3,000 psi. Mill-out OTIS XN-Nipple to 4.750" ID. Made several wiper trips (dry). Nipple clean. Continue to RIH with singles from Pipe Shead. Looking for cement stringers and Top of Cement. Expected TOC = 11,940' ctmd. Tagged at 11,475' dd. Continue to WashlReam in Hole. 2.4 bpm/1 ,800 psi. Continue to find small stringers. Clean-out to 11,6857'. Hole sticky. Work stuck pipe. Pipe came free. Motor packed off. POOH wI BHA # 5 on 2 7/8" PAC DP. Break out & LID BHA #5. Clear & clean rig floor. Prep to RIH. Redress Annular Circulating Valve & Pump Out Sub. Change out Mud Motor & Oil Jars. Finish redressing Ann. Valve & Pump Out Sub. Printed: 12/21/2005 1:56:07 PM Page 4 of 5 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 13-31 13-31 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES From - To I Hours I Task , Phase ! t Code NPT __________ I 1.00 CLEAN P DECOMP 12/2/2005 00:30 - 01 :30 01 :30 - 04:30 3.00 CLEAN P 04:30 - 06:30 2.00 CLEAN P 06:30 - 07:00 0.50 CLEAN P 07:00 - 13:00 6.00 CLEAN P 13:00 - 13:30 0.50 CLEAN P 13:30 - 14:30 1.00 CLEAN P 14:30 - 16:00 1 .50 CLEAN P 16:00 - 17:00 1.00 CLEAN P 17:00 - 22:30 5.50 CLEAN P 22:30 - 00:00 1.50 CLEAN P DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP 12/3/2005 00:00 - 01 :30 1 .50 CLEAN P DECOMP 01 :30 - 02:30 1.00 CLEAN P DECOMP 02:30 - 05:00 2.50 CLEAN P DECOMP 05:00 - 06:00 1.00 EVAL P DECOMP 06:00 - 07:00 1.00 EVAL P DECOMP 07:00 - 08:00 1.00 EVAL P DECOMP 08:00 - 15:30 7.50 CLEAN P DECOMP 15:30 - 16:00 0.50 CLEAN P DECOMP 16:00 - 17:00 1.00 EVAL P DECOMP 17:00 - 19:30 2.50 EV AL P DECOMP 19:30 - 22:00 2.50 EVAL P DECOMP 22:00 - 23:00 1.00 EVAL P DECOMP 23:00 - 00:00 1.00 EVAL P DECOMP 12/4/2005 00:00 - 02:00 2.00 WHSUR P DECOMP 02:00 - 04:00 2.00 BOPSU P DECOMP 04:00 - 05:30 1.50 WHSUR P DECOMP 05:30 - 07:00 1.50 BOPSU P DECOMP 07:00 - 11 :00 4.00 BOPSU P DECOMP 11 :00 - 11 :30 0.50 BOPSU P DECOMP Start: 11/25/2005 Rig Release: 12/6/2005 Rig Number: 4ES Spud Date: 4/2/1994 End: Description of Operations M/U BHA #6 as follows: 5 Bladed MM Mill, Mud Motor, XO, Stab, XO, Float Sub, Ann. Circ. Sub, Jars, XO Pump Out Sub, 6' @ 7/8" DCs. TL= 215.47'. RIH wi BHA #6 on 2 7/8" PAC DP. M/U circulating head. Drop ball. P/U Wt = 135K, S/O Wt = 63K. Close Annular circulating Valve. Attempt to clean-out deeper. Plugged-off/packed-off. Work stuck pipe. Free. Unable to u-plug! Drop ball & pressure up to 4000 psi, could not open Pump out sub. POOH WET!!. Stand back 2 7/8" PAC DP. Break out & UD BHA #6. Plugged @ top of motor. Clear & clean rig floor. M/U BHA #7 as follows: 4 3/4" Bit, Casing Scraper, XO, XO, Bumper Sub, Oil Jars, XO, 627/8" PAC DCs. TL = 200.43'. Service rig. Cut & slip 84' of drilling line. Adjust brakes. RIH wi BHA # 7 on 2 7/8" PAC DP. Circulate bottoms up & continue pumping 20 Hi-Vis sweep around. Recovered small amounts of V. fine sand, pipe dope, small amount of course sand & black oily material. 3 BPM @ 1800 psi. Con't to circulate. Pumped 20 bbls Hi-Vis sweep. Recovered small amount of V. fine sand, pipe dope, debris & black oily material. PIU singles & tag up @ 11853'. 125 stans, + 8' of of jt 376. Wash down from 11853 to 11865'. could not get deeper. 3 BPM @ 1500 psi. Reverse circulate & pump 20 bbl sweep around. 3 BPM @ 1700 psi. Recovered cement & V. fine sand. Also recovered some metal shavings on Ditch Magnets. UD 1 single & pull 1 stand. R/U to test casing. Test 5 1/2" Casing at 4,000 psi/35 mins. Good Test. Record on Chart. Rig down Test Equipment. Run back in Hole with 1 Stand and 1 Single to confimr Clean-Out depth. Dry tag at 11,863' dd. Prep to POOH. POOH and single down 376 jt 2 7/8" PAC Drill Pipe. Lay down BHA #7...4 3/4" Bit and Scraper. Installl Shooting Flange on top of Hydril. PJSM with All. Rig-up SWS E-Line to run Depth Corrulation Log. Test lubricator to 500 psi, Ok. RIH wi CCUGR. Correlate to USIT log & check depth. E-line corrected depth = 11,864'. POOH. RID logging tools & equip. Remove shooting flange. Install TWC & test same. NID BOPE. Bleed off hanger void. NID & remove coil tubing hold down flange. N/U BOPE. RU lubricator & pull FMC BPV. RD lubricator. Set Test Plug. Rig-up Test Equipment for BOP Test. Test BOP to BP/AOGCC requirements at 250/3,500 psi. State's right to witness Test waived by J. Chrisp. Rig down Test Equipment. Pull Test Plug. Printed: 12/21/2005.1 :56:07 PM Page 5 of 5 BP EXPLORATION Operations Summary Report Legal Well Name: 13-31 Common Well Name: 13-31 Event Name: WORKOVER Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 4ES Date i From - To ; Hours I Task: Code NPT Phase i RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP 12/4/2005 11 :30 - 12:30 1.00 RUNCO 12:30 - 13:00 0.50 RUNCO 13:00 - 00:00 11.00 RUNCO 12/5/2005 00:00 - 06:00 6.00 RUNCO 06:00 - 07:00 1.00 RUNCO 07:00 - 07:30 0.50 RUNCO 07:30 - 10:00 2.50 RUNCO 10:00 - 11 :00 1.00 11 :00 - 12:00 1.00 12:00 - 13:00 1.00 13:00 - 14:30 1.50 RUNCO 14:30 - 15:00 0.50 WHSUR P RUNCMP 15:00 - 17:00 2.00 BOPSU P RUNCMP 17:00 - 20:00 3.00 WHSUR P RUNCMP 20:00 - 21 :00 1.00 WHSUR P RUNCMP 21 :00 - 00:00 3.00 WAIT RUNCMP 12/6/2005 00:00 - 06:00 6.00 WAIT RUNCMP 06:00 - 08:00 WAIT RUNCMP Start: 11/25/2005 Rig Release: 12/6/2005 Rig Number: 4ES Spud Date: 4/2/1994 End: Description of Operations ...........-.-.. ---- Rig-up handling equipment and Torque Turn Equipment to run 31/2" TCII Completion. Perform final Jewelry inspection. PJSM with All. M/U & Baker-Lok tail pipe assys & RIH. Con't to RIH w/3 1/2" , 9.3#, 1-80, TCII completion. Torque turn all connections to 2300 ft-Ibs. Con't to RIH w/3 1/2" 9.3#, L-80, TCII tubing. Torque turn all connections to 2300 ft-Ibs. Ran total of 370 jts. Make-up Tubing Hanger. Land Completion. P/U 103 K, S/O 60K. Rig up to Reverse Circulate. Test Lines. Reverse Circulate with - 145 bbls x 140 deg Sea Water at 2 bpm/225 psi. Continue to Reverse in with -145 bbls x 140 deg Sea Water w/Corrosion Inhibitor, mixed at 25 gals/100 bbls. Rig-up Lil' Red. Pressure test Line. Reverse in with 50 bbls Diesel at 2 bpm. Allow diesel to U-Tube to Freeze Protect Well. Drop Packer Setting Ball/Rod. Lil' Red pressure test line to 4,800 psi. Pressure up on Tubing with Diesel. Set Packer and test Tubing at 4,500 psi/30 min. Good. Record on Chart. Bleed Tubing down to 1,500 psi and close in. Pressure up on Annulus with Diesel and test Casing at 4,000 psi/30 min. Good. Record on Chart. Bleed Tubing/Casing to 0 psi. State's right to witness test, waived by J. Chrisp. Rig down Lil' Red. R/D test equip. Drain stack. Install TWC & test. N/D BOPE. N/U tree & adapter flange. Test tree & void to 5000 psi, Ok. P/U lubricator & pull TWC. Install BPV. UD lubricator. Secure tree & cellar. Wait on weather for Kuparuk River Bridge restrictions. Clkean paint & maintain rig. Con't to wait on weather for bridge restrictions. Con't to paint, clean & maintain rig. Temps in the Kuparuk area -40 degs. Kuparuk Road and Pads Dept continues to monitor. Restrictions on crossing the Kuparuk River Bridge have been released. Rig Released at 08:00 hrs. Printed: 12/21/2005 1:56:07 PM Page 1 .., BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 13-31 13-31 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 4ES Hours Task Code NPT Phase 12/8/2005 00:00 - 04:30 4.50 RIGU N WAIT PRE 04:30 - 05:00 0.50 RIGU P PRE 05:00 - 07:45 2.75 BOPSU P PRE 07:45 - 08:00 0.25 RIGU P PRE 08:00 - 12:00 4.00 RIGU P PRE 12:00 - 20:30 8.50 BOPSU P PRE 20:30 - 00:00 3.50 RIGU P PRE 12/9/2005 00:00 - 01 :30 1.50 RIGU P PRE 01 :30 - 01 :45 0.25 WHIP Ip WEXIT 01 :45 - 02:50 1.08 WHIP P WEXIT 02:50 - 05:30 2.67 WHIP P WEXIT 05:30 - 06:00 0.50 WHIP P WEXIT 06:00 - 06:40 0.67 WHIP P WEXIT 06:40 - 08:30 1.83 WHIP P WEXIT 08:30 - 10:15 1.75 WHIP P WEXIT 10:15 - 12:30 2.25 WHIP P WEXIT 12:30 - 18:00 5.50 STWHIP P WEXIT 18:00 - 20:00 2.00 STWHIP P WEXIT 20:00 - 23:00 3.00 STWHIP P WEXIT 23:00 - 00:00 1.00 STWHIP P WEXIT 12/10/2005 00:00 - 01 :00 1.00 STWHIP P WEXIT Start: 11/18/2005 Rig Release: 12/6/2005 Rig Number: 4ES Spud Date: 4/2/1994 End: 12/25/2005 Description of Operations Wait on completion of wireline work. Ran 2.72" by 8' long drift to 11,869', Drifted thru tailpipe with 2.733" drift. PJSM and move rig over well. ACCEPT RIG AT 0500 HRS. 12/08/05. NU BOP. Continue installation of traction motor on injector power pack. PJSM for coil swap. Swap reel and complete installation of traction motor on injector power pack. Test BOPE. Witnessing of BOP test waived by Jeff Jones AOGCC. Pull coil to injector head and stab coil. M/U coil packoff. Weld on 2" CTC. Pull test CTC with 45K. Prep to pump 5 bbls MEOH ahead of KCL water. Fill coil with 5 bbl MEOH and 40 bbl KCL water. Pump dart. Dart landed at 40.3 bbls. Press test inner reel valve. SAFETY MEETING. Review procedure, hazards and mitigation for M/U BOT whipstock and Sperry BHA. M/U BHA #1, BOT 3-1/2 x 5-1/2" Whipstock, Setting tool, FAIV, Sperry MWD, orienter and BOT MHA. BHA OAL = 73.9'. RIH with Whipstock BHA. Circ KCL water at 0.3 bpm. Take retums to tiger tank. Check orienter at 2700', OK, RIH at 90 fpm. RIH clean thru packer and nipples. Log GR tie-in with CMT/GR of 05/02194. Log up. Added 5' to CTD. RIH with whipstock. Up wt = 38K, Dwn wt = 19K. Tag PBTD at 11,866'. Pick up 2 ft off bottom to 11,864'. Whipstock TF at 155R. Increase rate to 1.9 bpm, 3700 psi, Hold rate for 4 minutes. Stop pump for 4 minutes. Pump 0.2 bpm, increasing press, setting tool sheared at 1800 psi, circ at 1 bpm, Whipstock top set at 11,851' BKB. TF at 160L. POH. LD WS setting tool and PU window milling assy. RIH. Swapping to 2# bio. Up wt 38K, DN wt 17K, Tag and correct 11853.8. Pinch point 2.8 below Top of WS. Mill window, 1.54/1.57 bpm @ 2150 psi 1900 psi FS. Mill to 11857 start losing returns as high as .5 bpm. 15-20 bph. Mill window, 1.6/1.2 bpm, 2000/2080 psi, 1 fph, Still losing .4 bpm. Time Milled to 11,859'. Mill window, 1.6/1.2 bpm, 2000/2080 psi, 1 fph, Still losing .4 bpm. Stalled 2 times at 11860' at bottom of window. Ream window. Clean window. Time mill at 1 fph to 11862'. Window at 11854-11860'. Mill formation, 10 fph, 1.6/1.2 bpm, 2130 psi, 1 K WOB, Swap well over to rebuilt FloPro system while milling formation. Have 1 bpm fluid loss with used FloPro at window. Did not heal up. Ream window area 4 times up and down while circ well to used FloPro. Printed; 12/27/2005 8;36;13 AM I « Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 12/10/2005 00:00 - 01 :00 01 :00 - 03:00 03:00 - 03:30 03:30 - 04:00 04:00 - 06:45 06:45 - 09:00 09:00 - 09:40 09:40 - 11 :30 11 :30 - 12:30 12:30 - 14:30 14:30 - 15:00 15:00 - 1 :30 19:30 - 21 :00 21 :00 - 22:30 22:30 - 23:30 12/11/2005 00:00 - 01 :30 23:30 - 00:00 Page2~ BP EXPLORATION Operations Summary 13-31 13-31 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 4ES Hours Task Code NPT Phase 1.00 STWHIP P 2.00 STWHIP P 0.50 STWHIP P 0.50 DRILL P 2.75 DRILL P 2.25 DRILL P 0.67 DRILL N 1.83 DRILL N 1.00 DRILL INN 2.00 DRILL 0.50 DRILL P 4.50 DRILL P 1.50 DRILL P 1.50 DRILL P 1.00 DRILL P 0.50 DRILL P 1.50 DRILL P WEXIT WEXIT WEXIT PROD1 PROD1 PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Start: 11/18/2005 Rig Release: 12/6/2005 Rig Number: 4ES Spud Date: 4/2/1994 End: 12/25/2005 Description of Operations Fluid loss of 1 bpm with FloPro at window. 1.6/0.6 bpm. Stop pump and went thru window OK. Window is clean. Flag coil at 11,700' EOP. POH with 2.74" wiindow milling BHA. UO milling BHA. Mills drifted at 2.74/2.73 go 1 no-go. PRE-SPUD MEETING, Reviewed well plan, hazards and mitigation with crew. M/U build BHA#3 with 2.8 deg extreme motor and re-build HC bi-center bit. OAL = 60.2'. RIH .Tie in to flag No correction. RIH to 11834 attempt to orientate. 1.71 1.2 bpm 3200 psi FS. Attempt to orient. Pulser failure. POH. POH for MWD pulser failure. POH to 6618. ' Lost one pump assignment incorrect i.e so second pump not accessible. Change assignments. Continue to POH. Change out MWD pulser. RIH. Shallow hole test orienter OK. Continue to RIH. Orient 145R. Directionally drill 1.71/.66 bpm at 3330 psi FS - 3230 psi. Loss rate gradually diminishing to .6 bpm after 18 ft of new hole. Then losses increased back to 1.2 bpm. Slow drilling in ale. 10-15 fph. Drilling build section with 1.1 bpm fluid loss. 1.7. .5 bpm, 3150 psi, 5K WOB, 10-15 FPH. Drilled to 31'. Drilling build section with 1.0 bpm fluid I s. 1.7/0.7 bpm, 3250 psi, 5KWOB, 10-15 FPH. D' to 11950' Orient around to 80R. Had to up above window to get clicks. Drilling build section wi .9 bpm fluid loss. 1.61 0.7 bpm, 3250 psi, 5KWO Q-15FPH.Drilledt011955'. Drilled build s on in Zone 4. Had 0.9 bpm losses to 11,994'. Lost full r ns at 11,994'. Drilling indicated a fault at this depth ailed motor and GR spike. Drill ahead with 1.7/0.1 b ,60 deg incl. Drilled to 12050'. iper trip to window. Clean trip. RIH clean. No overpulls or weight loss due to cuttings. Drilled build section in Zone 4. Full losses. 1.6 bpm, 3100 psi, 2 K WOB, End build section at 12,100'. Estimate 90 deg incl at bit. Log up to window at 10 fpm. No returns. Clean hole up to window. Log GR tie-in at window. POH for lateral BHA. Dial down motor to .9 degree. Swap bits. RIH 11895 to log up to tie in. Tie -in zero correction.. RIH and tag TO at 12103' Orient to 6R Directionally drill 1.77 1.06 bpm at 2911 psi ,FS = 2700 psi. Drilled to 12250'. Wiper to window. Clean trip. No over pulls or packoff's. Directionally drill 1.85 1 .11 bpm at 3200 psi ,FS = 3000 psi. WOB 2-3K,ROP 100+. 01:30 - 02:15 02:15 - 03:30 03:30 - 04:00 04:00 - 06:00 06:00 - 08:00 08:00 - 10:00 10:00 - 10:30 10:30 - 10:40 10:40-11:1 11:10 - .10 0.75 DRILL P 1.25 DRILL P 0.50 DRILL ILL DRILL 0.17 DRILL 0.50 DRILL 3.00 DRILL 0.33 DRILL P 2.25 DRILL P PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Printed: 12/27/2005 8:36:13 AM ) ) C'-'~~,1 ",~'11 '11=' 'C 'I :, : ~,=r::J :l' II i I' I \ ~ '. ,.=.:::;:J :"'-..::1 iI:¡ "I ·,·r:::) I :,,=J / / / I' FRANK H. MURKOWSKI, GOVERNOR ALASIiA. OIL AlWD GAS CONSERVATION COJDIISSION 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Bryan Mclellan Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 \,Ol\'..oLfD Re: PBD 13-31 Sundry Number: 305-318 ~ANNEtJ NO~Q 0 8 2005 Dear Mclellan: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this.ßtay of October, 2005 Enc!. rAt IO'i3<OC; . \tJ(d\R~1\ftt5 ') STATE OF ALASKA P vj Y /3/ S . ALASKA OIL AND GAS CONSERVATION COMMISSION OCT 1 2 Z005 APPLICATION FOR SU N DRY APPROV Þll!.ka Oil & Gas Cons. Commission 20 MC 25.280 AnchOfage 1. Type of Request: II Abandon [J Suspend [J Operation Shutdown [J Perforate [J Other [J Alter Casing [J Repair Well [J Plug Perforations [J Stimulate [J Re-Enter Suspended Well [J Change Approved Program II Pull Tubing [J Perforate New Pool [J Waiver [J Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: o Development 0 Exploratory o Stratigraphic iii Service /' 5. Permit To ~iII Number 194-040 6. API Number: 50- 029-22459-00-00 -----'.." 99519-6612 82.3' 9. Well Name and Number: PBU 13-31 ADL 028314 10. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool , ',ÞR~SENJ'iWELGCÖNQtrION::SlJMMÂR~:I".,,·,,:I':,i','·:·· i,.:.':','"":""..,.,"",·,,,,,,',..··:,·I,·.'!¡,:,:",' Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12062 9045 None None 8. Property Designation: 1f.· Total Depth MD (ft): Total Depth TVD (ft): 12150 9109 Léngt~ Structural Conductor 80' 20" 112' 112' 1490 470 Surface 3494' 9-5/8" 3527' 3244' 6870 4760 Intermediate Production 12105' 5-1/2" 12137' 9100' 7740 6280 Liner Perforation Depth MD (ft): 11974' - 12060' Packers and SSSV Type: None Perforation Depth TVD (ft): 8981' - 9044' Tubing Size: 3-1/2" x 2-7/8" Tubing Grade: Coil Tubing Packers and SSSV MD (ft): NIA Tubing MD (ft): 9009' 12. Attachments: 181 Description Summary of Proposal o Detailed Operations Program 14. Estimated Date for Commencing Operations: o BOP Sketch 13. Well Class after proposed work: ~/ o Exploratory 0 Development iii Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Bryan McLellan Title Drilling Engineer Signature ~ /Yl Phone 564-5516 Commission Use Only October 20,2005 Date: 15. Well Status after proposed work: o Oil 0 Gas o WAG 0 GINJ o Plugged DWINJ iii Abandoned o WDSPL Contact Bryan McLellan, 564-5516 Date Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness ~IUg Integrity mBOP Test 0 Mechanical Integrity Test 0 Location Clearance Sundry Number: 3 D 5- 31 S Oth -r-, :L er: \ ~. -;, \; +t" (,10 ¡:J ç( ~ . RBDMS 8Ft 0 (T J 4 2005 . , .cOMMISSIONER APPROVED BY THE COMMISSION Date ~~¿i£ ~ORt6, NAL .-"'"'-...---- . ') ') GER ,&féJ.1l3l~, 13-31 proposed Ri~ Workover Procedure Note: This RWO is in preparation for a CTD sidetrack. The sidetracked well, 13-31A, will be a ./ WAG injector wI a KOP of -11,855' md. The CTD group will submit the Permit To Drill application at a later date. 1. MIRU Service Coil Tubing Unit. P&A existing perfs from current TD (-12,000' md) to,..........-· 11950' (above all existing perfs). RDMO. 2. Tag cement top wI slickline and pressure test cement plug to 2200 Psi. --- 3. MIRU workover rig. NU and test BOPE to 4000 psi. Circulate out freeze protection fluid with clean seawater through tubing cut. 4. Pull and lay down 3-1/2" coiled tubing completion to the cut @ +1-8960' md. 5. Pull tubing stub and seal assembly from SBR. 6. Pull SBR and tubing tail from XN nipple @ 8976' md. 7. RIH wi mill and scraper to mill out Nipples @ 7998' and 8976' md to 4.75" ID. 8. RIH wi RTTS to 11,750' md and test casing to 4000 psi for 30 minutes. / 9. Run 3-1/2" L-80 TC-II premium connection completion with packer and standard tailpipe for CTD. Set packer @ +1-11,625' md. 10. Displace IA to packer fluid, freeze protect tbg & lA, and set the packer. 11. Test tubing to 4000 psi. Test Inner Annulus (IA) to 4000 psi. /' 12. Set BPV. ND BOPE. NU and test tree. RDMO. 13. MIRU CTD Rig and drill CT Sidetrack (PTD application to be sent at a later date). / TREE = ? .. WELLH~D= C~ 'Ä"C-rUÄTOR;;' ."" . n,,, "" 's'Ä'km' c ............"....".".. ................. .. "n..·.. KS. ELEV = 82' "..".".."....."""""""""".. ....- SF. ELEV = KOP= 'Mïiïx·Ä'rÏ'gle";,'··'·· .".....,..,..,..."""..".......""""... .. Datum MD = 'OatumfVÖ'; .. ) .13-31. EXisting Completion ) 1449' "·······"'s3'@'·6233i ....... "...."...""....."". """".... 11838' .. .,....,.,.".....,................. 8800' SS I) 3095' 1-13-1/2" CAM DS SSSV NIP, ID = 2.812" 1 I 9-5/8" CSG, 40#, NT-80, ID = 8.835" 1-1 3527' r----J ~ . . 7998' 1-15-1/2" PARKER SWS NIP, ID = 4.562" 1 Minimum ID = 2.25" @ 9003' I I I 8974' 1-13-1/2" OTIS XN NIP, ID = 2.75" 1 2-7/8" OTIS XN NIPPLE ~ 8975' 1-13-1/2" x 2-7/8" XO, ID = 2.44" 1 ~ \ 8976' 1- 5-1/2" OTIS XN NIP, ID = 4.455" WITH XN LOCK MANDREL 8978' 1-1 TOP OF SSE, ID = 3.0" 1 I 8985' 1-12-7/8" MULESHOE, ID = 2,375" 1 '\ / -I 8988' 1-13-1/2" x 2-7/8" XO, ID = 2.44" 1 12-718" TBG, 6.5#, L-80, .0056 bpf, ID= 2.441" H 9009' ~ , PERFORA TION SUMMARY REF LOG: MWD ON 04/14/94 ANGLEATTOPÆRF: 43 @ 11974' Note: Refer to Production DS for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2-1/8" 4 11974-11986 0 09/02/99 2-1/8" 4 11990 - 12002 0 09/02/99 2-1/8" 4 12006 - 12014 0 09/02/99 2-1/8" 4 12022 - 12034 0 09/02/99 I 3-3/8" 6 12040 - 12060 0 09/02/99 9003' 1-12-7/8" OTIS XN NIP, ID = 2.25" 1 9009' 1-12-7/8" MULESHOEWLEG, ID = 2.44" 1-1 ELMD TT NOT LOGGED 1 I I I PBTD 1-1 12060' ~ 15-1/2" CSG, 17#, L80, ID = 4.892" 1-1 12137' DATE REV SY COMMENTS DATE REV SY COMMENTS 04/17/94 ORIGINAL COM PLETION OS/24/01 RNI1P CORRECTIONS 02/11/03 JP/tlh wArvrn SAFElY NOTE 01/11/04 TJPTLP wArvrn SAFElY NOTE 07/26/05 RPHlPJC WArvER CANCELLED PRUDHOE SA Y UNIT WELL: 13-31 ÆRMIT No: "'1940400 API No: 50-029-22459-00 SEC 14, T10N, R14E, 3341.52' FEL & 5014.3' FNL BP Exploration (Alaska) TREE = "'WELLHEAD= ACTUATOR; ...... KS. ELEV = SF. ELEV = KOP= 'M~ixÄágle;"" ' Datum MD = bãtumiYb; ? CrN .... ·BÄKrnc 82' -) 1449' ""§3"@'623à" 11838' 8800' SS I 9-5/8" CSG, 40#, NT-80, ID = 8.835" 1-1 3527' ~ 13 -31 Proposed Pre~fiQ P&A I> . . ') 3095' 1-13-1/2" CAM DS SSSV NIP, ID = 2.812" 1 ~ 7998' 1-15-1/2" PARKER SWS NIP, ID = 4.562" 1 Minimum ID = 2.25" @ 9003' I I I 8974' 1-13-1/2" OTIS XN NIP, ID = 2.75" 1 2-7/8" OTIS XN NIPPLE ~ 8975' 1-13-1/2" x 2-7/8" XO, ID = 2.44" 1 \ \ 8976' 1- 5-1/2" OTIS XN NIP, ID = 4.455" wrrH XN LOCK MANDREL 8978' 1-1 TOP OF SBE, ID = 3.0" 1 8985' 1-12-7/8" MULES HOE, ID = 2.375" 1 \. / 8988' 1-13-1/2" x 2-7/8" XO, ID = 2.44" 1 , I 2-7/8" lBG, 6.5#, L-80, .0056 bpI, ID = 2.441" H 9009' ~ I ÆRFORA TION SUMMARY REF LOG: MWD ON 04/14/94 ANGLEATTOPÆRF: 43 @ 11974' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 11974 - 11986 0 09/02/99 2-1/8" 4 11990 - 12002 0 09/02/99 2-1/8" 4 12006 - 12014 0 09/02/99 2-1/8" 4 12022 - 12034 0 09/02/99 3-3/8" 6 12040 - 12060 0 09/02/99 I PBTD 1-1 12060' I 5-1/2" CSG, 17#, L80, ID = 4.892" l-i 12137' ~ ~ 9003' 1-12-7/8" OTIS XN NIP, ID = 2.25" 1 9009' 1-12-7/8" MULESHOE WLEG, ID = 2.44" 1-1 ELMD TT NOT LOGGED 11,950' 1-1 Proposed TOC TREE = "WELLHEAD= ACTUATOR";' KB:äBï = BF. ELEV = k6Þ;' . MaxÄngïe;' . baiÚmMÖ; DatumìVD= ) 1 -31 ) ? FMC ... . . BAkrnc 82' Proposed RWO f449ï ,,···,·,·,·.5~,,~:~?~.~~ 11838' ... ...... .. ."."".."...",,,....,,..,.. 8800' SS I 9-5/8" CSG, 40#, NT-80, ID = 8.835" 1-1 ~ 3527' . . 3-1/2"TBG,9,3#,L-80,ID=2,992" l-t 11750' 1 ÆRFORA TION SUMMARY REF LOG: MWD ON 04/14/94 ANGLEATTOPÆRF: 43 @ 11974' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 2-1/8" 4 11974-11986 isolated proposed 2-1/8" 4 11990 -12002 isolated proposed 2-1/8" 4 12006 - 12014 í:solated proposed 2-1/8" 4 12022 - 12034 isolated proposed 3-3/8" 6 12040 - 12060 ìsolðted proposed 3095' 1-i3-1/2" OTIS X NIP, ID = 2.813" ~ . 7998' 1- 5-1/2" PARKER SWS NIP, MILLED OUT TO 4.75" ID I---- 1-15-1/2" OTIS XN NIP, MILLED OUT I I TO 4.75" ID 8976' ~ I / 11610' l-t 3-1/2" OTIS X NIP, ID = 2.813" 1 11625' l-t 3-1/2" X 5-1/2" BKR SABL-3 PKR, ID = 2.79" 11640' 1--i3-1/2" HES 'BPX' X NIP, ID = 2.75" I 11650' l-i 3-1/2" HES 'BPX' X NIP, ID = 2.75" ~ 11750' l-t 3-1/2" WLEG I I 11950' l-i DESIRED TOC 1 * Mclt~~~l e¿,LM-~ Þ ~~ ý)/t;t.u,J þ. , V\ '\ (.) t.\¡b <,.( 1.. ~t u tU trC{L.~_ , l ì VL-t-V ~~S ~,tGl t ~tt-~· /I ¡¿~ \\ i~"S . W6,~ to I rs I &0 oS- I ... . " ';''':< :,;.:<:~> ·j<~";'.':':.:,f.~ /':':',_ ~ I PBTD 1---1 12060' 15-1/2" CSG, 17#, L80, ID = 4.892" 1---1 12137' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/17/94 ORIGINAL COM PLETlON OS/24/01 RNlTP CORRECTIONS 02/11/03 JP/tlh WAN ER SAFElY NOTE 01/11/04 TJPTLP WANER SAFElY NOTE 07/26/05 RPl-VPJC WANER CANCELLED 10/07/05 BJM PROPOSED RWO PRUDHOE BA Y UNIT WELL: 13-31 ÆRMIT No: tl'1940400 API No: 50-029-22459-00 SEC 14, T10N, R14E, 3341.52' FEL & 5014.3' FNL BP Exploration (Alaska) ) ) bp BP Exploration (Alaska) Inc. Attn: Well Integrity Engineer, PRB-24 Post Office Box 196612 Anchorage, Alaska 99519-6612 July 26, 2005 Mr. Winton Aubert, P.E. Alaska Oil & Gas Conservation Commission 333 W. 7th Ave. Anchorage, Alaska 99501 Subject: 13-31 (PTD 1940400) Application for Cancellation of Sundry #300-188 RECEIVED JUL 2 9 2005 Ala$ka QiI & GIS Cons. Commht$~on Anchorage Dear Mr. Aubert: Attached is Application for Sundry Cancellation form 10-404 to cancel sundry number 300-188. The sundry was for continued water injection with rapid TxlA communication. The well will remain shut-in while being evaluated for rig workover. With the cancellation of the sundry, the well will be removed from the Monthly Injection Report. If you require any additional information, please contact Anna Dube or Joe Anders at (907) 659-5102. Sincerely, sx!~Cflk Anna Dube Well Integrity Coordinator SCANNED AUG G 2 2005 Attachments Application for Sundry Cancellation form 10-404 ) ) RECEIVED STATE OF ALASKA JUL 9 Z005 ALASKA OIL AND GAS CONSERVATION COMMISSION 2 REPORT OF SUNDRY WELL OPERATleNS1 &Gas Cons. Commission . ^nchorag.e 1. Operations Performed: Abandon 0 Repair Well 0 Plug PerforationsD Stimulate 0 OtherlX) Cancel Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time Extension 0 10-403 Change Approved ProgramD Operation Shutdown 0 Perforate 0 Re-enter Suspended Well 0 2. Operator Name: 3. Address: 4. Current Well Class: Development 0 ExploratoryD BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): StratigraphicO ServiceŒ) 9. Well Name and Number: 13-31 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool 82.30 8. Property Designation: ADL-028314 11. Present Well Condition Summary: Total Depth measured 12150 feet true vertical 9109.3 feet Effective Depth measured 12060 feet true vertical 9043.8 feet Plugs (measured) Junk (measured) Casing CONDUCTOR SURFACE PRODUCTION Length 80 3496 12107 TVD 32.0 112.0 31.0 - 3243.7 30.0 - 9099.9 Size 20" 91.5# H-40 9-5/8" 47# NT-80 5-1/2" 17# L-80 MD 32 112 31 - 3527 30 - 12137 Perforation depth: Measured depth: 11974 -11986,11990 -12002,12006 -12014,12022 -12034,12040 -12060 True vertical depth: 8981.17 - 8989.91, 8992.82 - 9001.56, 9004.47 - 9010.29, 9016.12 - 9024.86, 9029.23 - 9043.79 Tubing ( size, grade, and measured depth): 3-1/2" 7# QT-800 Coiled TBG 2-7/8" 6.16# L-80 2-7/8" 6.5# L-80 @ 28 @ 8975 @ 8988 8975 8985 9009 Packers & SSSV (type & measured depth): No Packer 3-1/2" Cameo DS SSV Nipple @ 3095 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 5. Permit to Drill Number: 194-0400 6. API Number 50-029-22459-00-00 None None Burst 1490 6870 7740 Collapse 470 4760 6280 Oil-Bbl Representative Dailv AveraQe Production or Injection Data Gas-Mef Water-Bbl Casing Pressure Tubing Pressure WAG D GINJD WINJŒ) WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174. Sundry Number or N/A if C.O. Exempt: 300-188 13 Prior to well operation: Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilD GasD Copies of Logs and Surveys run _ Daily Report of Well Operations _ ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Joe Anders I Anna Dube IAnnaDube (~n n (. ~)~ J Title Well Integrity Coordinator Phone 659-5102 Date 7/26/05 Signature Form 10-404 Revised 4/2004 DevelopmentD Service 00 13-31 (PTD # 1940400) Internal Waiver Cancellation ) ) Subject: 13-31 (PTD #1940400) Internal Waiver Cancellation to5 From: "Dube, Anna T" <Anna.Dube@BP.com> 5f!;J- 1l2.1 . Date: Tue, 26 Jul2005 15:38:44-0800 To: "AOGCC - Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us>. j im .;.. regg@admin. state.ak. us CC: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>, "Holt, Ryan P (VECO)" <Ryan.Holt@BP.com> Winton and Jim, The internal BP waiver for rapid TxlA communication on well 13-31 (PTO #1940400) has been cancelled. The well will remain shut-in and classified as a trouble well while it is being evaluated for a rig workover. The application for cancellation of sundry #300-188 has also been sent by mail. Please let us know if it is not received in the next couple of days. Well 13-31 will also be removed from the Monthly Injection Report given the cancelled sundry and waiver. Please let me know if you have any questions. Thank you, }{nna {])u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659..5102 Pager: (907) 659-5100 x1154 SC/\N~\jEO II4UG 0 9 2005 1 of 1 7/27/20059:51 AM "' ._-- '~~.Inu. iUuu,çOITeCI... All, Please find enclosed the MIT form with corrected date of 05/10/04 for 13-31 (PTD #1940400), (Sundry #300-188) . If there is any questions please call. Clark Olsen for Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: (907) 659-5102 Mobile: (907) 943-1154 Pager: (907) 659-5100, xl154 Email: NSUADWWellIntegri!yEngineer@bp.com «MIT PBU 13-31 05-10-04.xls» ---.... _.. ..--. ---.- - .-- -----..- -- -. -.---.---- - --..----.. . . . .......- Content-Description: MIT PBU 13-31 05-10-04.xls . MIT PBU 13-31 05-10-04.xls Content-Type: application/vnd.ms-excel Content-Encoding: base64 1 of I 5/14/20043:09 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test I I ~t'. 5' ¡4-D4-- Email to: Winton_Aubert@admin.state.ak.us; Bob]Jeckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay / PBU / OS-13 05/10/04 Clark Olsen Chuck Sheve declined to witness well13-31 I Type Inj. Is P.T.D. 1940400 Type test P Notes: 2 Year CMIT TxlA to 3000 psi Packer Depth Pretest Initial 15 Min. 30 Min. TVD 6,915' TUbing 3001 3,0001 2,9501 2,95011nterval Test psi 3,000 Casing 700 3,400 3,300 3,300 P/F a P / weill Type (nj. I TVD TUb~ng Interval P.T.D. Type test Test psi Casing P/F Notes: weill Type ,nj. I TVD I TUb~ngl ,nterva, P.T.D. Type test Test psi Casing P/F Notes: weill Type 'nj. I TVD I TUb~ngl Iinterva, P.T.D. Type test Test psi Casing P/F Notes: weill Type ,nj'l I TVD I TUb~ng I'nterva' P.T.D. Type test Test psi Casing P/F Notes: : Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes 1= Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover 0 = Other (describe in notes) MIT Report Form Revised: 06/19/02 MIT PBU 13-31 05-10-04.xls ON OP. BEFOP E Phillips Alaska Inc, Post Office Box 10-0360 Anchorage, Alaska 99510-0360 Telephone (907) 276-1215 PHILLIPS Alaska, Inc. A Subsidiary of PHILLIPS PETROLEUM COMPANY July 15, 2000 Mr. Tom Maunder Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Subject: DS 13-31 (PTD 194-040) Sundry Notice Variance Request Dear Mr. Maunder: Attached is an Application for Sundry Approval 10-403 variance request for well 13-31 (PTD 194-040). The request is for approval to continue produced water injection with known tubing by production casing communication. Attached is a proposed Action Plan,. wellbore schematic, and MIT form. If you require any additional information or clarification, please feel free to contact either Joe Anders or me at (907) 659-5102. Sincerely, Jerry Dethlefs Problem Well Specialist Attachments RECEIVED i82000 Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ~' · ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type'~f 'r~u'est: AbandOn_ Suspend_ "Operational shutdown'_ Re-enter ~t]~nded well_ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance X Perforate _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) Phillips Alaska, Inc. Development__ RKB 82 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 100360 Stratigraphic_ Anchorage, AK 99510-0360 Service__X Prudhoe Bay Unit 4. Location of well at surface 8. Well number 3698' FNL, 1421' FEL, Sec: 14, T10N, R14E, UM (asp's 685803, 5931611) 13-31i At top of productive interval 9. Permit number / approval number 4969' FNL, 3192' FEL, Sec. 15, T10N, R14E, UM (asp's 678787.5, 5930173) 194-040 At effective depth 10. APl number 50-029-22459 At total depth 11. Field / Pool 5014' FNL, 3342' FEL, Sec. 15, T10N, R14E, UM (asp's 678639, 5930121) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12150 feet Plugs (measured) Tagged PBTD @ 12030' on 4/01/2000. true vertical 9109 feet Effective depth: measured 12030 feet Junk (measured) true vertical 9022 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 112' 20" 260 Sx Arcticset 112' 112' Surface 3445' 9-5/8" 880 Sx CS III, 250 Sx CS II, & 37,' 3527' 3244' Sx Class G Production 12055' 5-1/2" 821 Sx e 12137' 9100' 0RI61NAL Perforation depth: measured 11974'- 11986'; 11990'- 12002'; 12006'- 12014'; 12022'- 12034'; 12040'- 12060'. RECEIVED true vertical 8981' - 8990'; 8993' - 9002'; 9004' - 9010'; 9016' - 9025'; 9029' - 9044'. i8 2000 !Tubing (size, grade, and measured depth ,3-1/2", CT @ 8988' MD; 2-7/8", CT @ 9O09' MD. Alaska 0il & Gas Cons. Commission Packers & SSSV (type & measured depth) 2-7/8" Locater Seal @ 8977' MD (6916' TVD) Anchorage 5-1/2" CAMCO BAL-O SSSV @ 2164' MD. 13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __ 14. Estimated date for commencing operation 15. Status of well classification as: July 15, 2000 16. If proposal was verbally approved Oil __ Gas __ Suspended __ Name of approver Date approved Service WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Joe Anders/Jerry Dethlefs @ 659-5102 Signed ~/~'~---~-~.~ (~ (~'~~ Title: PRB Problem Wells Specialist Date Jerr~ Ocf~lefs FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness I Approval no. Plug integrity __ BO P Test Location clearance --I ..~O"/~1~ Mechanical Integrity Test _~ '~ ["~-~.~,~O\~ Subsequent form required ~ ~ ~.~-~\..1 ~ ~b~"~' ~,.~--~- ORIGINAL SIGNED BY .... Approved by order of t,he Commission ~ Tevlqr ~R;~rmqllnt Commissioner Date Approved Copy Returned _ _ Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE DS 13-31 Sundry Request SUNDRY DISCUSSION AND PROPOSED ACTION PLAN July 15, 2000 DISCUSSION Well 13-31 is a WAG injector exhibiting 3-1/2" tubing x 5-1/2" production casing pressure communication. An MITIA was performed on 6/3/00 which failed with a leak rate of 2 bpm @ 2300 psi. The AGOCC was notified on 6/4/00. A Leak Detect Log (LDL) on 6/17/00 found a large leak in the coiled tubing completion @ 8309' and a small leak near the tubing hanger. A tubing tail plug was set and the well passed a Combination MIT T x casing (CMIT T x IA) @ 3000 psi on 6/23/00 (attached). Engineering is evaluating the long-term repair options for this well. This sundry request is to continue water (only) injection into the well, based on the following information: · A combination MIT (3-1/2" tubing x 5-1/2" casing) passed 6/23/00 @ 3000 psi, demonstrating mechanical integrity of the casing and injection is into the approved zone; · The Leak Detect Log on 6/17/00 identified the leak points in the tubing; ° Normal wellhead injection pressure is 1200-1500 psi on produced water injection service. ° Continue water injection (only) into the well; -'1 ° Perform 2-year combination MIT 3-1/2" tubing x 5-1/2" casing against a tubing plug; x~. ~ Monitor'wellhead pressures dailY; ~ · Report monthly the daily injection rate, tubing pressure and annulus pressure; ~ ~,~ Shut-in and secure the well should MIT's or wellhead pressures indicate problems and notify // ~ the AOGCC~.~.~ ~ RECEIVED ,. UL i 8 2000 Alaska Oil & Gas Cons. Commission Anchorage ARCO ALASKA, INC. Tubing-Coiled Casing SSSVNIP ............................... Casing NIP 8956' Tight spot noted i..(~!~.~) ........................................................... NIP XO i..~.~.~/i~q~iiq.-i-5-.~--~.i§~B-~ ............ i (2-7/8" Locator Seal ::. ~!.0.it) ............................ i :/ NIP ..-..~' Tubing-Coiled TTL Prudhoe Bay APl: 500292245900 Orig Compltn: 4/16/94 SSSV Type: Last W/O: 4/17/94 Annular Fluid: Diesel 6.8/8.6 SW Ref Log Date: 1/1/60 Reference Log: RKB: 82 ft LastTag: 1675 TD: 12150 ftKB Last Tag Date: 1/22/98 Max Hole 53 deg @ 6233 Angle: Well Type: INJ Angle @ TS: 43 deg @ 11966 Depth Comment 8956 8956' Tight spot noted (WLM) 8976 8976' MIN ID = 2.375" (2-7/8" Locator Seal Unit) 9003 9003' MIN ID: 2.250" (2-7/8" Otis XN Nip) Date Note 6/16/00 Tight spot @ 8294; unable to drift for 3-1/2" plug TTL ELM @ 0: ELM W/L Re-entry Guide (Not Logged) Daterun: 1994-04-16 Depth TVD Type Description 3095 2930 SSSVNIP 3-1/2"Camco DS SSSV N~pple 7998 6242 NIP 5-1/2" Parker SWS Nipple (Behind CT) 8974 6914 NIP 3-1/2" Otis XN Nipple (Can't drift tbg for plug) 8975 6915 XO Crossover 3-1/2" x 2-7/8" 8976 6915 NIP 5-1/2" Otis XN Nipple D=4.455" w/XN Lock Mandrel (Behind CT) 8977 6916 LS 2-7/8" Locator Seal Unit 8987 6923 TTL 2-7/8" Indexing Muleshoe W/L Re-entry Guide 9003 6933 NIP 2-7/8" Otis XN Nipple Prior to setting plug see well file dated 07/04/94 9008 6936 TTL 2-7/8" Muleshoe W/L Re-entry Guide Size Weight Grade 9.625 40.00 NT-80 5.500 17.00 L-80 Size Weight Grade 3.500 0.00 2.875 0.00 Interval TVD 11490 - 12002 11974-11986 12006-12014 12022-12034 12040-12060 Top Btm Feet Description 0 3527 3527 Casing 0 12137 12137 Casing Top Btm Feet Description 0 8988 8988 Tubing-Coiled 8975 9009 34 Tubing-Coiled Zone Status FeetSPF Date Type 8639-9002 SAG,ZONE O 512 4 9/3/99 APERF 4,GOC 8981 - 8990 ZONE 4 O 12 4 9/3/99 APERF 9004 - 9010 ZONE 4 O 8 4 9/3/99 APERF 9016- 9025 ZONE 4 O 12 4 9/3/99 APERF 9029- 9044 ZONE 4 O 20 6 6/9/94 IPERF 13-31 Angle @ TDi 43 deg @ 12150 Rev Reason: Gen Note-kak Last Update: 6/28/00 ID 2.812 4.562 2.750 2.441 3.115 2.375 0.000 2.250 0.000 Comment MiN'iD = 2;25~~ NIP TTL REC = VED t"jL i 8 ?.300 Alaska 0it & Gas Cons. Comn~ss'~n AnOaom~e Testh g Annular Communication Mechanical Integrity Test DATE: 6/23/00 TYPE CMIT Tbg X IA to 3000 psi WELL: 13-31 MIT: PASS Well Status: Shut In TBG: 50 CONTROL: 5000 INITIAL PRESSURE DATA TYPE: MI IA: 130 OA: 0 BALANCE: 500 PRE-TEST PREPARATIONS BLED TBG FROM 50 SI T 0+ PSI HRS TYPE OF FLUID AND VOLUME BLED: gas TBG and IA FL 480' 30 surface MIN TEST PRESSURES TIME TBG IA OA COMMENTS 9:20 0+ 120 0 START PUMPING TIME 9:50 1810 2020 0 START TEST 10:05 1740 70 1950 70 0 10:10 2800 3010 0 START TEST 10:25 2730 70 2940 70 0 10:40 2690 40 2900 40 0 START TEST 0 0 0 0 START TEST 0 0 0 0 TOTAL VOLUME PUMPED: 6 BBLs of diesel down the IA FINAL PRESSURES TBG: 20 IA: 200 OA: 0 OBSERVATIONS / COMMENTS FINAL STEPS MUST BE COMPLETED AND CHECKED OFF!!! - FLAG THE CASING vALvE WITH LOAD AND TEST INFORMATION - FLAG THE WING VALvE IF SI AT TIME OF LOADING AND TESTING. - NOTIFY DRILL SITE OPERATOR OF TEST RESULTS, VOLUMES PUMPED AND STATUS OF WELL. Witness: Kenny Morse~°land Johnson Well 13-31 Failed MITIA (PTD 194-040) Subject: Well 13-31 Failed MITIA (PTI) 194-040) Date: Sun, 4 Jun 2000 08:36:27 -0900 From: "PRB Problem Wells" <P 1041~ppco.com> To: blair_wondzell@admin, state.ak.us, tom_maunder~admin.state.ak.us CC: john_spaulding~admin.state.ak.us Hello Blair and Tom. Well 13-31 (PTD 194-040) failed an MIT-IA today (6/3/00). Leak rate was 2 BPM 2325 psi. 13-31 is currently injecting produced water, approximately 3000 bwpd 850 psi. Leak location is unknown. It is completed with 3-1/2" coiled tubing inside 5-1/2" production casing. We are planning to leave the well online and running a leak detect log to locate the leak point. Call if you have any questions. Joe Anders, PE Problem Well Specialist Phillips Alaska, Inc. (907) 659-5102 pl041@ppco.com 1 of 1 6/5/00 8:33 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development__ RKB 82 feet 3. Address Explorato~.__ 7. Unit or Property name P. O. Box 100360 Stratigraphic_ Anchorage, AK 99510-0360 service__x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 3698' FNL, 1421' FEL, Sec. 14, T10N, R14E, UM 13-31i At top of productive interval 9. Permit number / approval number 309' FSL, 3192' FEL, Sec. 15, T10N, R14E, UM 94-40 At effective depth 10. APl number 50-029-22459 At total depth 11. Field / Pool 5014' FNL, 3342' FEL, Sec. 15, T10N, R14E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12150 feet Plugs (measured) Tagged PBTD @ 12060' MD (8/27/1999) true vertical 9109 feet Effective depth: measured 12060 feet Junk (measured) true vertical 9044 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 112' 20" 260 sx Arcticset 112' 112' Surface 3445' 9-5/8" 880 Sx CS III, 250 Sx CS II, & 37~ 3527' 3244' Sx Class G Production 12055' 5-1/2" 824 Sx G 12137' 9100' Perforation depth: measured 11974'- 11986'; 11990'- 12002'; 12006'- 12014'; 12022'- 12034'; 12040'- 1206(~i~.~,,. true vertical 8981' - 8990'; 8993' - 9002'; 9004' - 9010'; 9016' - 9025'; 9029' - 9044'. Tubing (size, grade, and measured depth)3-1/2", CT @ 8988' MD; 2-7/8", CT @ 9009' MD. ~k'E~IV~D Packers & SSSV (type & measured depth) No Packer. 3-1/2"CamooDSSSSVNippIe @ 3095'MD. SEP 1 3 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) ~aska 0]1 & Gas Cons. Commission Treatment description including volumes used and final pressure Anchora~ 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1730 1450 Subsequent to operation 6201 1312 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __X Oil__ Gas__ Suspended__ Service ~ .~l~i~r.3 U' 17. I hereby certify that the foregoing is tr~u,e and correct to the best of my knowledge. SigneEdrino~a /~~~~,¢~Title Arco EngineeringSupervisor Date '~,/~,~ Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 13-31i DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 8/27/1999: 9/02/1999: RIH & tagged PBTD @ 12060' MD. MIRU ELU. PT'd equip. RIH & shot 44' of Add Perforation located @: 11974' - 11986' MD (Zone 4) Ref Log: MWD 4/14/1998. 11990'- 12002' MD (Zone 4) 12006' - 12014' MD (Zone 4) 12022' - 12034' MD (Zone 4) Used 2-1/8" carriers and all shots @ 4 SPF, '0° phasing, 0° orientation, & balanced press. POOH w/guns. ASF. Returned well to water injection service & obtained valid injection data. STATE OF ALASKA A~ASKA OIL AND GAS CONSERVATION COMMISS REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate__~X Plugging _ Perforate __ Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_ 82' RKB 3. Address: Exploratory _ 7. Unit or Property: P.O. Box 100360 Stratagrapic_ Anchorage~ AK 99510-0360 Service _x Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 1579' NSL, 1423' WEL, Sec 14, T11N, R14E, UM. 13-31 At top of productive interval: 9. Permit number/approval number: 309' NSL, 3192' WEL, Sec 15, T11N, R14E, UM. 94-40 At effective depth: 10. APl number: 50-029-22459 At total depth: 11. Field/Pool: i266' NSL, 3342' WEL, Sec 15, TION, R14E, UM. Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 12150 feet Plugs (measured) PBTD Tagged @ 12068' MD (5/20/97). true vertical 9109 feet Effective Depth: measured 12068 feet Junk (measured) true vertical 8887 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 260 Sx Arcticset 112' 112' Surface 3494' 9-5/8" 880 Sx CS III, 375 G, 3527' 3244' & 250 Sx CS II Production 12105' 5-1/2" 821 Sx Class G 12137' 9100' Perforation Depth truemeasured 12040- 12060'vertical 9029 - 9044'ORIGINAL Tubing (size, grade, and measured depth) 3-1/2", Coil Tubing @ 8988' MD; 2-7/8", Coil Tubing @ 9009' MD. Gas Corem Packers and SSSV (type and measured depth) No Packer; XN Nipple @ 8976' MD w/XN Lock Mandrel; Camco DS Nipple @ 3095' MD, 13. Stimulation or cement squeeze summary Intervals treated (measured) see attached Intervals treated (measured) 14. Reoresentitive Daily Average Production or injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation - - 2155 1597 Subsequent to operation 15769 - - 3049 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ X Oil __ Gas _ Suspended _ Service X V~',~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~~ "~o ~'~L/ Title: Engineerin~l Supervisor Date ~,- 5 - Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 13-31i DESCRIPTION OF WORK COMPLETED FULLBORE STIMULATION TREATMENT 5/19/97: A Fullbore Acid Stimulation to improve injection rate was performed as follows: MIRU & PT equipment. Pumped treatment fluids through the open perforation interval at: 12040 - 12060' MD (Z4) Pumped: a) 10 bbls Seawater, followed by b) 82 bbls 12% HCI w/10% Xylene @ 2.75 bpm, followed by c) 145 bbls Seawater Displacement, followed by d) Shutdown. Rigged down. 5/20/97: RIH &tagged PBTD at 12068' MD. Returned well to miscible gas injection & obtained a valid injection rate. ri F:t I I_/I N CS SEFIVI I-- E ~: WELL LOG TRANSMITTAL To: State of Alaska June 28, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - DS 13-3 lI AK-RB-940310 The technic~ data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted magnetic tape with LIS listing. RECEIVED JUN 2 8 199~o Alaska Oil & Gas Cons. Commission Anchorage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company PERMIT DATA 9/+-0/+0 ~/DGR/EWR/FXE 9fl-0/¢0 (.//DGR/EWR/FXE / 9/+-0/+0 b~'.3IT (CEMENT) 9/+-0~0 ~ERF 9/+~0~0 ~AT 9~-'0~0 ~7 9~-0~0 ~,P 9~'-0~0 ~VEY VEV '"">., AOGCC Indi vi' dua '1 ~, eological Materia'ls T DATA._P L IJ S L 1181~'-12150~ L 8898'~9'1/+/+~ L 3/+80-1200~ L 10993-12061 L 117/+2-12010 MWD , MD MWD , TVD R COMP DATE: 06/2/,/9/+ R 0/+/02-06/2/+/9/+ R 0-11973 SPERRY R 0,00-12150 GCT SUN SHLIJMBERGR Page: '1 Date: 0/+/'10/96 RUN DATE .... RECVD 1 05/2/+/'9/+ 1 '1 05/27/'9/+ 1 07/11/9,q. 1 11/1/+/'9/+ 10/28/9/4. 10/28/9t~. 10/28,/'9/4. 10/28/9/+ Ar'e dry ditch samples Was the well cored? Are wei'l We'li is COMMENTS required? yes yes tests r'equi'r'ed? n comp'l iance Ini ti' al r'ecei v ed %_._--y¢'~--- no ~..A4a~lysis & descr'ip.t~on recei'ved? yes ~/R~ceived? ~ ye s no ALASKA OiL STATE OF ALASKA ' ~ AND GAS CONSERVATION C ISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENI~D [] ABANDONED [] SERVICE I~ WAG Iniector . 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 94-40 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 $0- 029-22459 4. Location of well at sudace 9. Unit or Lease Name 1579' NSL, 1423' WEL, SEC. 14, TION, R14E i;~3¢-Al'K)i~ Prudhoe Bay Unit At Top Producing Interval i: YEIi~ 10. Well Number 309' NSL, 3192' WEL, SEC. 15, TION, R14E E9 i ~m 13-31 i 11. Field and Pool At Total Depth "~.~~i~ Prudhoe Bay Field/Prudhoe Bay Pool 266' NSL, 3342' WEL, SEC. 15, TION, R14E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and SeriaJ No. KBE = 82.3' I ADL 28314 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 4/2/94 4/14/94 6/24/94I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey ~20. Depth where SSSV set ~21. Thickness of Permalros t / 12150' MD/9109' TVD 12062' MD/9045' TVD YES r~ NO [] 3095' feet MD ! 1900' (Approx.) 22. Type Electric or Other Logs Run MWD 23. CASING, LINER AND CEMENTING RECORD SETI'ING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOll'OM HOLE SIZE CEMB'~IT~ FIECORD AMOUNT PULLED 20" 91.5# H-40 32' 112' 30" 260 sx Arcticset (Approx.) 9-5/8" 47# L-80 33' 3527' 12-1/4" ~OsxCS #~3756x"G'/2~OsxCS # 5-1/2" 17# L-80 32' 12137' 8-1/2" 821 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and ;)5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter3-3~8" 6 spf 3-1/2"x 2-7/8" 9008' XN Nipple ~ 8976' MD TVD 12040'- 12060' 9029'-9044' Coiled tubing 0 R I Gl r~jAL 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 10/23/94 I Injector Date of Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED DIL-BBL GAS-MCF INATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED OCT 2 8 1994 Alaska Oil & Gas Cons. Commission Anchora,~e Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE =1. _ , 30. GEOLOC. dC MARKERS MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, IDEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB Sag River 11828' 8875' Shublik 11859' 8897' Sadlerochit 11966' 89 75' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Y/~/ ! ~~ TitleOrillino_Eno_ineerSuoervisor Date /~ -Z~"~ ~ ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". R E C E IV E D Form 10-407 OCT 2 8 1994 Aiask~ Oil & Gas Cons. Commission Anch0rc,~e BP/AAI SHARED SERVICE DAILY OPERATIONS~' PAGE: 1 WELL: 13-31I BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 04/02/94 03:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 04/02/94 ( 1) TD: 0'( 0) 04/03/94 (2) TD: 1105' (1105) 04/04/94 ( 3) TD: 3400' (2295) 04/05/94 ( 4) TD: 3550' ( 150) PU BHA TO RIG FLOOR MW: 0.0 VIS: 0 MOVE RIG FROM DS 13-35 TO DS 13-31. MU RISER, FLOW LINE AND FLOW LINE JETS. TAKE ON WATER @0300 HRS. PU 12 1/4" BHA TO RIG FLOOR. DRILLING MW: 8.9 VIS:300 MAKE UP 12 1/4" BHA. FUNCTION TEST DIVERTER SYSTEM. INSTALL MWD AND ORIENT. LOAD HOLE W/ MUD AND CHECK FOR LEAKS. DRILLING F/ 112-380'. FLOWLINE JETS PLUGGED, CLEAN OUT. DRILLING F/ 427-612'. TRIP TO UNPLUG JET NOZZLE, CHANGE OUT MOTOR STABILIZER SLEEVE. DRILLING F/ 612-671'. BALL MILL SHUT DOWN, CIRCULATE WAITING ON REPAIRS. DRILLING F/ 671-1105'. DRILLING MW: 9.3 VIS:250 DRILLING F/ 1105-1136'. BALL MILL DOWN, CIRCULATE WAITING FOR REPAIRS. DRILLING F/ 1136-1168'. BALL MILL DOWN, CIRCULATE WAITING FOR REPAIRS. DRILLING F/ 1168-1899'. BALL MILL DOWN, CIRCULATE WAITING FOR REPAIRS. DRILLING F/ 1899-2503'. CIRCULATE BOTTOMS UP AND SHORT TRIP FROM 2503-838'. DRILLING FROM 2503-3400'. NU SPLIT SPEED HEAD MW: 9.2 VIS: 41 DRILLING FROM 3400-3550'. CIRCULATE HOLE CLEAN. SHORT TRIP TO HWDP, SLM W/ NO CORRECTION. SHORT TRIP TO HWDP, SLM W/ NO CORRECTION. CIRCULATE HOLE TO CLEAN UP SHAKERS, DROP TOTOCO SURVEY. POH, TIGHT SPOT @2430', PU KELLY AND REAM OUT, CONTINUE TO POH, LD 12 1/4" BHA AND BREAK KELLY. RU AND RUN 84 JTS 9 5/8" - 40# CASING, HIT BRIDGE, CONTINUE IN HOLE LANDING CASING W/ SHOE @3527' CIRCULATE AND CONDITION HOLE, RECIPROCATE CASING TH~U JOB. CEMENT 9 5/8" CASING. DISPLACE W/ RIG PUMPS @10.5 BPM. BUMPED PLUG. RELEASE PRESSURE AND CHECK FLOATS. GOOD CIRCULATION AND LIFT PRESSURES THRU OUT JOB, NO CEMENT TO SURFACE. RU AND PUMP TOP JOB, GOOD CEMENT TO SURFACE. LD 1" AND CEMENT HEAD, BACK OUT AND LD LANDING JOINT. ND RISER AND DIVERTER. NU SPLIT SPEED HEAD. RECEIVED OCT 2 8 1994 A~ska Oil & Gas Cons. Commission A~hora,,e WELL : 13-31I OPERATION: RIG : NABORS 28E PAGE: 2 04/06/94 ( 5) TD: 4750'(1200) 04/07/94 ( 6) TD: 6338'(1588) 04/08/94 ( 7) TD: 7680'(1342) 04/09/94 (8) TD: 8878' (1198) 04/10/94 ( 9) TD: 9361' ( 483) 04/11/94 (10) TD:10070' ( 709) 04/12/94 (11) TD:10725' ( 655) DRILLING MW: 9.5 VIS: 44 FINISH Nil SPLIT SPEED HEAD AND BOPE. CHANGE OUT SWIVELS. PRESSURE TEST BOPE. INSTALL MODIFIED WEAR BUSHING. PU 8 1/2" BHA, ORIENT SAME AND RIH. TAG CEMENT @3438'. CIRCULATE AND CONDITION MUD. PRESSURE TEST CASING. DRILL PLUGS. FLOATS, CEMENT AND 10' OF NEW HOLE TO 3560'. CIRCULATE AND CONDITION MUD, SHUT IN AND PERFORM LOT. DRILLING FROM 3560-4511'. SHORT TRIP FROM 4511-3520' W/ NO PROBLEMS. DRILLING FROM 4511-4750'. DRILLING MW: 9.6 VIS: 45 DRILL FROM 4750-5863'. CIRCULATE SWEEP. PUMP DRY JOB. TRIP OUT OF HOLE. NO PROBLEMS. SERVICE WEAR BUSHING. CHANGE BIT. TRIP IN HOLE WITH BIT #3 TO 9 5/8" CASG SHOE. CUT AND SLIP DRILLING LINE. TRIP IN HOLE. WORKED THROUGH BRIDGE @3864'. PRECAUTIONARY REAM 60' TO BOTTOM. DRILL FROM 5863-6338'. DRILLING MW: 9.6 VIS: 43 DRILL FROM 6338-6870'. CIRCULATE SWEEP. PUMP DRY JOB. TRIP OUT OF HOLE FOR BIT. NO PROBLEMS. TRIP IN HOLE WITH BIT #4. NO PROBLEMS. PRECAUTIONARY REAM 70' TO BOTTOM. DRILL FROM 6870-7680'. CIRCULATE SWEEP MW: 9.6 VIS: 44 DRILL FROM 7680-7841'. SHORT TRIP TO 6850'. NO PROBLEMS. DRILL FROM 7841-8878'. CIRCULATE SWEEP. PUMP DRY JOB MW: 9.6 VIS: 44 CIRCULATE SWEEP. DROP SURVEY & PUMP DRY JOB. TRIP OUT OF HOLE FOR BIT. CHANGE BIT, DYNA DRILL & NM DRILL COLLAR. ORIENT. TRIP IN HOLE. PRECAUTIONARY REAM 90' TO BOTTOM. DRILL FROM 8878-9361'. FINISH CIRCULATING SWEEP OUT. PUMP DRY JOB. DRILLING MW: 9.6 VIS: 45 TRIP OUT OF HOLE FOR BIT. NO PROBLEMS. CHANGE BIT & DYDNADRILL. ORIENT MWD. TRIP IN HOLE. CUT & SLIP DRILLING LINE. TRIP IN HOLE. PRECAUTIONARY REAM 90' TO BOTTOM. NO PROBLEMS. DRILL FROM 9361-10070'. DRILLING MW: 9.6 VIS: 45 DRILL FROM 10070-10725'. TOO MANY HARD STREAKS FOR PDC BIT RUN ON THIS PAD. RECEIVED OCT 2 8 1994 u~l & Gas Cons. Commission Anchorc,..~e WELL : 13-31I OPERATION: RIG : NABORS 28E PAGE: 3 04/13/94 (12) TD:11365' ( 640) 04/14/94 (13) TD:l1814' ( 449) 04/15/94 (14) TD:12150' ( 336) 04/16/94 (15) TD:12150' ( 0) 04/17/94 (16) TD:12150 PB: 0 DRILLING MW: 9.6 VIS: 44 CIRCULATE SWEEP, PUMP DRY JOB. TRIP OUT OF HOLE FOR BIT. TIGHT @10445-10295'. PULL WEAR BUSHING. RIG UP AND TEST BOPE. INSTALL WEAR BUSHING. CHANGE OUT JARS, DYNADRILL AND MWD. ORIENT. TRIP IN HOLE WITH BIT #7. TIGHT @9806-10089'. PRECAUTIONARY REAM FROM 10600-10725'. DRILL FROM 10725-11365'. DRILLING MW: 9.6 VIS: 46 DRLG F/11365 T/11814. ADT=7.75, AST=2 HRS. CBU. PUMP DRY JOB, DROP SURV. TOOH F/NEW BIT & RLL TOOL. SLM. TIGHT 11039 T/10563. CHNG BHA/PU & TEST SPERRY SUN RLL TOOL. ORIENT BHA. TIH, CUT & SLIP DL. HIT BRIDGE@ 10740. PU KELLY -WORK THRU BRIDGE. HOLE PK'D OFF. WORKED PIPE, EST. CIRC & CLEAN UP HOLE. TIH -PRECAUTIONARY REAM F/11714 T/11814. LD DP MW: 9.6 VIS: 42 HOLE PKG OFF CIRC & COND MUD MUD WT CUT T/8.5PPG. DRLG F/11814 T/12150. HOLE TAKING FLUID @ 12130/2 BPM/ 235 BBL LOSS. SHORT TRIP 16 STNDS T/10595. BROKE CIRC. SPOT 100BBL LCM PILL/ FLUID LOSS 67 BBL. PULLED 15 STNDS PUMP DRY JOB. TOOH LD 5" DP. 485 TOTAL MUD LOSS. FRZ PROTECT CASG MW: 8.5 VIS: 0 TOOH LD 5" DP & BHA. RU & RUN 282 JTS. 5.5 CASG. MU HNGR & LAND CASG. LOST 153 BBLS MUD WHILE RUNNING CASG. CIRC & COND. MUD ADDING LCM @ 5BPM. BATCH MIX TAIL CMT. 190 BBLS MUD LOST. TEST CMT LINE. PUMP 20 BBLS H20, 70 BBLS MCS-4 SPACER, 342 BBLS LEAD & 52 BBLS TAIL CMT. DISPLACE W/279.7 BBLS OF SEAH20. @10BPH. BUMPED PLUG. CIP @ 02:50. 50 BBLS MUD LOST. PRESS. TEST CASG T/3500 F/30 MIN. LD CMT HEAD, LANDING JT & CASG TOOLS. SET 7-5/8 PACKOFF & TEST T/5000 F/10 MIN. PU 2-7/8 DP T/FRZ PROT. 5.5 CASG T/2000'. RIG RELEASED MW: 8.5 Seawater FRZ PROTECT 5.5 CASG @2200' W/DIESEL. LD 2-7/8 DP. PULL SHORT BOWL PROT.INSTALL 12" FALSE BOWL. W/BPV IN PLACE. PRESS TEST T/1000. ND BOPE & SET BACK. NU HOLD DOWN FLANGE & PRESS TEST T/5000. OK. NU 4-1/16 TEMP. ABAND. TREE. FINISH CLEANING PITS. SECURE WELL & RELEASE RIG. OUTER ANNUL. WILL BE FRZ PROT. W/60/40 METHANOL. SIGNATURE: (drilling superintendent) DATE: OCT 2 8 1994 A~BskB. Oil & Gas Cons. Commissioo. Anchor~,..,e 13-31i DESCRIPTION OF WORK COMPLETED COILED TUBING COMPLETION INSTALLATION 6/6/94: RIH & tagged PBTD at 12005' MD. 6/7/94: RIH w/underreamer & reamed 4.7" hole down to 12112' MD, in preparation for perforating. Circulated the wellbore clean w/biozan & seawater POOH w/underreamer. Rigged down. 6/8/94: RIH & tagged PBTD at 12061' MD. 6/9/94: RIH w/perforation gun & tagged PBTD at 12085' MD. PU gun & shot initial perforations at: 12040 - 12060' MD (Z4) Ref Log: SWS USIT 5/2/94. POOH w/perf gun. Rigged down. 6/14/94: MIRU & PT equipment. RIH w/4.5" gauge ring & drifted down to 8954' MD. POOH w/ring, then RIH w/Seal Bore & Tubing Tail assembly, consisting of 5.5" XN Lock Mandrel w/No-Go Sub, 3" ID x 10' long Sealbore Extension w/XO to 2-7/8", w/2-7/8" x 15' long M8R Pup Joint, w/2-7/8" XN Nipple (2.25" ID), & 2-7/8" WLEG w/beveled Mule Shoe. Set assembly w/2-7/8" Tubing Tail at 9009' MD. POOH w/setting tool, then RIH w/2-7/8" XXN Plug. Set plug at 8981' MD. POOH w/running tool, then pumped 6 bbls Diesel down tubing & PT to 1550 psi for 30 minutes; good test. RIH & pulled XXN plug, then RIH w/brush & brushed nipple at 8980' MD. POOH w/brush, then RIH & set a 2-7/8" DXXN Plug w/check valve at 8980' MD. POOH. Rigged down. 6/19/94 - 6/21/94: MIRU 3-1/2" CTU & PT equipment. MU & RIH w/a Seal Assembly consisting of an Indexing Muleshoe, 2 Seal Units, Seal Spacer Tube, Locator Seal Unit, 3-1/2" AB Box x 2-7/8" EUE Pin, 2.813" XN Nipple, Coil Connector, 5869' of 3-1/2" Coiled Tubing, followed by Coil Connector, 3103' of 3-1/2" Coiled Tubing, Flow Coupling, Camco DS Nipple, Flow Coupling, Coil Connector, 3.68' of 3-1/2" Coiled Tubing, Coil Connector, & Tubing Hanger w/1.75" Pup (8987' total assembly length; see schematic attached). Landed in sealbore receptacle (above) & landed tubing hanger. PT annulus to 1500 psi; tested good. Rigged down. 6/24/94: RIH & pulled the 2-7/8" DXXN Plug (listed above), then RIH & tagged PBTD at 12062' MD. RECEIVED OCT 2 8 1994 Alaska Oil & Gas Cons. Commission Anchom.,e SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA pAGE PRUDHOE BAY DRILLING PBU/D. S. 13-3 lI 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 DATE OF SURVEY: 041494 MWD SURVEY JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -80.10 134 134.00 53.90 242 242.00 161.90 333 332.99 252.89 423 422.99 342.89 0 0 0 24 0 24 0 12 0 18 N .00 E .00 .00N .00E S 55.40 E .30 .275 .39E S 43.60 E .08 .755 .96E S 88.60 E .32 ..995 1.33E 5 56.30 E .19 1.125 1.69E .0O -.33 -.81 -1.14 -1.46 513 512.99 432.89 602 601.99 521.89 692 691.98 611.88 782 781.96 701.86 876 875.85 795.75 0 18 0 42 0 30 1 47 3 30 S 22.00 E .20 1.475 1.97E 5 58.90 E .56 1.975 2.52E 5 1.90 W .70 2.645 2.98E S 59.10 W 1.76 3.765 1.76E 5 72.80 W 1.92 5.375 2.25W -1.68 -2.13 -2.47 -1.06 3.17 972 971.62 891.52 1067 1066.32 986.22 1163 1161.91 1081.81 1257 1255.19 1175.09 1353 1350.00 1269.90 4 18 4 48 5 48 8 11 9 48 S 74.80 W .85 7.185 8.52W S 77.10 W .56 9.005 15.84W S 79.50 W 1.07 10.785 24.52W S 78.00 W 2.56 13.045 35.75W S 76.70 W 1.68'- 16.345 50.40W 9.66 17.18 26.04 37.49 52.49 1449 1444.52 1364.42 1543 1536.95 1456.85 1639 1631.18 1551.08 1734 1724.22 1644.12 1830 1818.07 1737.97 10 18 10 41 11 18 12 0 12 18 S 77.90 W .56 20.025 66.74W 5 77.10 W .45 23.735 83.46W S 79.10 W .74 27.505 101.38W S 82.00 W .96 30.635 120.30W S 87.10 W 1.16 32.545 140.40W 69.23 86.35 104.65 123.83 143.94 1925 1910.55 1830.45 2021 2002.89 1922.79 2116 2092.57 2012.47 2212 2181.35 2101.25 2308 2268.13 2188.03 14 6 17 36 20 53 23 47 26 47 5 87.40 W 1.90 33.585 162.06W 5 86.30 W 3.66 35.045 188.24W S 84.60 W 3.52 37.575 219.45W S 82.10 W 3.18 41.845 255.69W 5 80.30 W 3.23 48.155 296.22W 165.45 191.47 222.63 259.06 300.06 2403 2352.31 2272.21 2498 2435.44 2355.34 2594 2518.31 2438.21 2690 2599.85 2519.75 2785 2679.61 2599.51 28 23 29 30 31 6 32 35 33 12 S 77.60 W 2.14 56.615 339.40W S 77.70 W 1.16 66.455 384.31W S 81.30 W 2.52 75.235 431.92W S 83.00 W 1.82 82.135 482.09W 5 80.90 W 1.36 89.375 533.18W 344.06 390.01 438.41 489.02 540.57 2881 2759.29 2679.19 2976 2837.01 2756.91 3072 2913.57 2833.47 3167 2986.02 2905.92 3261 3055.71 2975.61 34 35 35 35 38 35 42 0 42 17 S 80.00 W 1.55 98.265 585.97W S 77.70 W 1.75 108.835 639.55W S 77.70 W 3.13 121.165 696.12W S 80.00 W 3.91 133.005 756.40W S 79.10 W .72 144.445 818.43W 594.11 648.71 706.58 767.99 831.07 RECEIVED OCT 2 8 '~994 Oil & Gas Cons. Commission Anchor~.,~ sPERRy-suN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D. S. 13-3 lI 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN DATE OF SURVEY: 041494 MWD SURVEY JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3357 3126.26 3046.16 3453 3194.84 3114.74 3583 3285.64 3205.54 3678 3351.63 3271.53 3774 3416.72 3336.62 43 5 S 77.40 W 1.46 157.71S 882.16W 45 42 S 76.70 W 2.76 172.77S 947.61W 45 42 S 77.60 W .50 193.46S 1038.32W 46 17 S 77.20 W .70 208.37S l105.01W 48 17 S 77.90 W 2.15 223.57S 1173.89W 896.14 963.23 1056.17 1124.44 1194.93 3869 3479.73 3399.63 3964 3542.68 3462.58 4060 3606.67 3526.57 4155 3670.24 3590.14 4251 3734.47 3654.37 48 35 S 75.80 W 1.68 239.74S 1243.11W 48 24 S 76.50 W .59 256.77S 1312.19W 48 0 S 78.80 W 1.83 272.08S 1382.08W 48 0 S 75.40 W 2.66 287.84S 1450.87W 48 0 S 75.80 W .31 305.58S 1519.97W 1265.92 1336.92 1408.42 1478.91 1550.07 4347 3799.14 3719.04 4441 3863.07 3782.97 4536 3928.28 3848.18 4631 3993.13 3913.03 4726 4057.25 3977.15 47 17 S 75.80 W .73 322.98S 1588.75W 47 0 S 76.00 W .36 339.77S 1655.59W 46 17 S 73.70 W 1.91 357.81S 1722.25W 47 35 S 75.80 W 2.12 376.06S 1789.22W 47 30 S 76.70 W .71' 392.72S 1857.31W 1620.84 1689.60 1758.41 1827.55 1897.51 4821 4121.55 4041.45 4915 4185.54 4105.44 5011 4251.44 4171.34 5105 4316.44 4236.34 5200 4382.43 4302.33 47 17 S 74.70 W 1.56 409.99S 1925.06W 46 54 S 76.10 W 1.17 427.34S 1991.69W 46 24 S 74.20 W 1.53 445.23S 2059.16W 46 5 S 76.70 W 1.95 462.29S 2124.86W 45 54 S 77.40 W .57 477.60S 2191.46W 1967.25 2035.90 2105.47 2173.16 2241.42 5299 4451.08 4370.98 5392 4514.63 4434.53 5487 4578.52 4498.42 5583 4642.38 456.2.28 5677 4704.79 4624.69 46 17 S 77.40 W .40 493.16S 2261.08W 47 30 S 80.70 W 2.89 506.04S 2327.73W 48 0 S 84.60 W 3.08 515.02S 2397.45W 48 35 S 86.00 W 1.26 520.89S 2468.88W 48 12 S 85.30 W .70 526.22S 2538.97W 2312.69 2380.57 2450.78 2522.12 2592.04 5771 4767.81 4687.71 5867 4832.35 4752.25 5962 4895.98 4815.88 6057 4958.04 4877.94 6153 5018.21 4938.11 47 35 S 86.30 W 1.02 531.33S 2608.52W 47 54 S 87.00 W .62 535.48S 2679.46W 48 0 S 86.10 W .71 539.73S 2749.87W 50 24 S 86.50 W 2.55 544.36S 2821.62W 52 0 S 83.00 W 3.29 551.23S 2896.10W 2661.40 2731.95 2802.00 2873.43 2947.95 6248 5076.83 4996.73 6342 5135.09 5054.99 6438 5195.17 5115.07 6533 5255.73 5175.63 6628 5316.79 5236.69 51 47 S 81.90 W .93 561.05S 2970.21W 51 35 S 80.90 W .86 572.08S 3043.14W 50 54 S 81.60 W .92 583.47S 3117.14W 49 54 S 80.00 W 1.67 595.17S 3189.39W 50 5 S 80.90 W .76 607.24S 3261.15W 3022.62 3096.36 3171.20 3244.38 3317.15 sPERRy-suN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 6723 5377.92 5297.82 6819 5440.14 5360.04 6915 5503.99 5423.89 7010 5568.60 5488.50 7106 5634.25 5554.15 DATE OF SURVEY: 041494 MWD SURVEY JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 49 47 S 79.10 W 1.48 619.87S 3332.76W 49 24 S 80.20 W .97 633.00S 3404.67W 47 12 S 80.20 W 2.29 645.20S 3475.29W 47 5 S 78.40 W 1.39 658.13S 3543.72W 46 35 S 77.00 W 1.18 673.04S 3612.15W VERT. SECT. 3389.86 3462.96 3534.62 3604.26 3674.25 7201 5699.70 5619.60 7296 5765'.52 5685.42 7390 5830.99 5750.89 7486 5898.28 5818.18 7581 5965.34 5885.24 46 17 S 76.70 W .39 688.71S 3679.19W 46 0 S 77.30 W .55 704.12S 3745.95W 45 42 S 74.20 W 2.39 720.71S 3811.29W 45 17 S 73.00 W .98 740.04S 3876.98W 44 54 S 73.00 W .42 759.71S 3941.33W 3743.01 3811.44 3878.69'~ 3946.76 4013.58 7677 6033.63 5953.53 7771 6100.79 6020.69 7864 6167.54 6087.44 7958 6235.10 6155.00 8054 6304.04 6223.94 44 24 S 70.20 W 2.11 781.00S 4005.33W 44 24 S 70.00 W .15 803.38S 4067.17W 43 54 S 74.70 W 3.56 823.02S 4128.86W 44 12 S 77.20 W 1.88 838.88S 4192.25W 44 0 S 77.70 W .42' 853.40S 4257.46W 4080.34 4145.17 4209.36 4274.56 4341.31 8148 6371.26 6291.16 8243 6438.19 6358.09 8337 6503.84 6423.74 8432 6569.96 6489.86 8526 6634.60 6554.50 44 42 S 77.50 W .76 867.51S 4321.63W 45 42 S 78.10 W 1.14 881.75S 4387.52W 45 42 S 79.30 W .91 894.93S 4453.48W 46 5 S 78.60 W .68 908.01S 4520.44W 47 0 S 79.80 W 1.33 920.79S 4587.47W 4406.97 4474.33 4541.59 4609.81 4678.04 8621 6699.63 6619.53 8712 6762.16 6682.06 8808 6827.44 6747.34 8899 6888.70 6808.60 8995 6952.81 6872.71 46 35 S 81.00 W 1.01 932.34S 4655.74W 46 35 S 81.40 W .32 942.46S 4721.08W 47 42 S 78.80 W 2.29 954.57S 4'790.39W 47 42 S 82.60 W 3.09 965.44S 4856.79W 48 30 S 83.30 W .99 974.21S 4927.70W 4747.28 4813.38 4883.74 4951.01 5022.35 9089 7015.22 6935.12 9183 7078.48 6998.38 9278 7143.27 7063.17 9374 7209.41 7129.31 9469 7275.87 7195.77 48 17 S 82.60 W .60 982.83S 4997.46W 47 5 S 82.00 W 1.36 992.15S 5066.36W 46 54 S 81.40 W .51 1002.18S 5135.11W 46 0 S 79.60 W 1.65 1013.65S 5203.72W 45 12 S 80.20 W .96 1025.55S 5270.54W 5092.54 5161.99 5231.43 5300.99 5368.87 9563 7342.17 7262.07 9657 7407.05 7326.95 9752 7471.48 7391.38 9847 7536.21 7456.11 9941 7600.49 7520.39 45 5 S 80.20 W .11 1036.90S 5336.21W 47 35 S 83.30 W 3.57 1046.62S 5403.51W 47 0 S 83.00 W .67 1054.94S 5472.82W 47 5 S 80.00 W 2.31 1065.22S 5541.57W 46 35 S 79.80 W .55 1077.24S 5609.09W 5435.51 5503.46 5573.16 5642.64 5711.21 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/9 DATE OF SURVEY: 041494 MWD SURVEY JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10034 7665.04 7584.94 45 30 S 80.50 W 1.30 1088.70S 5675.05W 5778.16 10129 7732.67 7652.57 43 42 S 81.60 W 2.06 1099.09S 5740.93W 5844.84 10223 7801.36 7721.26 42 24 S 79.60 W 2.01 1109.55S 5804.23W 5908.99 10317 7869.70 7789.60 44 17 S 81.60 W 2.49 1120.07S 5867.87W 5973.49 10413 7937.64 7857.54 45 35 S 81.40 W 1.36 1130.09S 5934.94W 6041.28 10508 8003.51 7923.41 46 35 S 82.80 W 1.50 1139.49S 6002.74W 6109.67 10602 8068.45 7988.35 46 0 S 80.90 W 1.59 1149.12S 6070.00W 6177.57 10699 8135.71 8055.61 46 12 S 81.90 W .77 1159.57S 6139.11W 6247.43 10794 8202.29 8122.19 44 47 S 83.00 W 1.69 1168.48S 6206.27W 6315.11 10894 8272.32 8192.22 46 17 S 84.70 W 1.93 1176.11S 6277.23W 6386.30 10984 8332.78 8252.68 49 17 S 80.50 W 4.80 1184.75S 6343.31W 6452.86 11080 8395.57 8315.47 49 0 S 83.00 W 1.99 1195.17S 6415.15W 6525.42 11175 8457.90 8377.80 49 0 S 80.20 W 2.22 1205.64S 6486.06W 6597.06 11271 8521.50 8441.41 48 0 S 79.60 W 1.14 1218.25S 6556.84W 6668.96 11367 8586.42 8506.32 46 54 S 82.50 W 2.50' 1229.26S 6626.68W 6739.64 11462 8651.87 8571.77 46 0 S 82.30 W .96 1238.37S 6694.92W 6808.42 11558 8718.01 8637.91 46 54 S 85.30 W 2.45 1245.87S 6764.07W 6877.80 11652 8782.72 8702.62 46 5 S 83.90 W 1.38 1252.28S 6831.95W 6945.73 11748 8850.24 8770.14 44 30 S 85.40 W 2.00 1258.65S 6899.87W 7013.71 11878 8944.06 8863.96 43 5 S 85.70 W 1.09 1265.64S 6989.57W 7103.23 11973 9013.54 8933.44 42 54 S 85.70 W .21 1270.49S 7054.18W 7167.68 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 7167.68 FEET AT SOUTH 79 DEG. 47 MIN. WEST AT MD = 11973 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 259.79 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 DATE OF SURVEY: 041494 JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -80.10 .00 N .00 E 1000 999.55 919.45 7.73 S 10.55 W 2000 1982.83 1902.73 34.65 S 182.03 W 3000 2856.43 2776.33 111.83 S 653.32 W 4000 3566.58 3486.48 263.06 S 1338.37 W .O0 .45 .45 17.17 16.72 143.57 126.40 433.42 289.85 5000 4243.85 4163.75 443.06 S 2051.49 W 6000 4921.41 4841.31 541.65 S 2778.05 W 7000 5561.79 5481.69 656.66 S 3536.54 W 8000 6265.21 6185.11 845.37 S 4220.80 W 9000 6956.12 6876.02 974.65 S 4931.42 W 756.15 322.73 1078.59 322.44 1438.21 359.62 1734.79 296.58 2043.88 309.09 10000 7641.21 7561.11 1084.70 S 5651.13 W 11000 8343.21 8263.11 1186.76 S 6355.27 W 11973 9013.54 8933.44 1270.49 S 7054.18'W 2358.79 314.92 2656.79 297.99 2959.46 302.67 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 DATE OF SURVEY: 041494 JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -80.10 80 80.10 .00 180 180.10 100.00 280 280.10 200.00 380 380.10 300.00 .00 N .00 E .05 S .08 E .45 S .65 E .95 S 1.14 E 1.00 S 1.50 E .00 .00 .00 .00 .00 .01 .00 .01 .00 480 480.10 400.00 580 580.10 500.00 680 680.10 600.00 780 780.10 700.00 880 880.10 800.00 1.31 S 1.91 E 1.83 S 2.29 E 2.54 S 2.98 E 3.73 S 1.81 E 5.45 S 2.5O W .01 .00 .01 .00 .02 .01 .04 .02 .16 .12 980 980.10 900.00 1080 1080.10 1000.00 1181 1180.10 1100.00 1282 1280.10 1200.00 1383 1380.10 1300.00 7.35 S 9.14 W 9.26 S 16.96 W 11.12 S 26.34'W 13.79 S 39.26 W 17.54 S 55.46 W .40 .24 .72 .32 1.18 .46 2.07 .88 3.45 1.38 1485 1480.10 1400.00 1586 1580.10 1500.00 1688 1680.10 1600.00 1791 1780.10 1700.00 1893 1880.10 1800.00 21.38 S 73.07 W 25.54 S 91.45 W 29.30 S 111.07 W 32.11 S 132.14 W 33.23 S 154.42 W 5.06 1.61 6.82 1.76 8.80 1.98 11.03 2.24 13.50 2.47 1997 1980.10 1900.00 2102 2080.10 2000.00 2210 2180.10 2100.00 2321 2280.10 2200.00 2434 2380.10 2300.00 34.61 S 181.23 W 37.14 S 214.78 W 41.78 S 255.17 W 49.17 S 302.18 W 59.84 S 354.07 W 17.05 3.55 22.58 5.53 30.55 7.97 41.31 10.76 54.49 13.18 2549 2480.10 2400.00 2666 2580.10 2500.00 2785 2680.10 2600.00 2906 2780.10 2700.00 3029 2880.10 2800.00 71.66 S 409.25 W 80.59 S 469.55 W 89.42 S 533.49 W 100.75 S 600.11 W 115.61 S 670.66 W 69.32 14.83 86.45 17.13 105.48 19.03 126.18 20.70 149.48 23.30 3159 2980.10 2900.00 3293 3080.10 3000.00 3432 3180.10 3100.00 3575 3280.10 3200.00 3719 3380.10 3300.00 132.07 S 751.19 W 148.64 S 840.22 W 169.36 S 933.08 W 192.24 S 1032.78 W 214.97 S 1134.06 W 178.96 29.48 213.88 34.92 251.92 38.04 294.97 43.05 339.11 44.14 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 DATE OF SURVEY: 041494 JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASDVERTICALVERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3869 3480.10 3400.00 4020 3580.10 3500.00 4169 3680.10 3600.00 4318 3780.10 3700.00 4465 3880.10 3800.00 239.84 S' 1243.51 W 266.35 S 1353.14 W 290.60 S 1461.47 W 317.92 S 1568.74 W 344.19 S 1673.31 W 389.46 50.35 440.20 50.74 489.64 49.45 538.82 49.18 585.87 47.05 4611 3980.10 3900.00 4759 4080.10 4000.00 4907 4180.10 4100.00 5052 4280.10 4200.00 5196 4380.10 4300.00 372.56 S 1775.39 W 398.45 S 1881.58 W 425.95 S 1986.05 W 453.38 S 2088.12 W 477.08 S 2189.11 W 631.58 45.71 679.73 48.15 726.94 47.21 772.46 45.52 816.55 44.09 5341 4480.10 4400.00 5489 4580.10 4500.00 5639 4680.10 4600.00 5789 4780.10 4700.00 5938 4880.10 4800.00 499.45 S 2291.08 W 515.18 S 2399.20 W 523.96 S 2511.45'W 532.20 S 2621.96 W 538.53 S 2732.27 W 861.11 44.56 909.26 48.15 959.86 50.59 1009.13 49.27 1058.16 49.03 6091 4980.10 4900.00 6253 5080.10 5000.00 6414 5180.10 5100.00 6570 5280.10 5200.00 6726 5380.10 5300.00 546.34 S 2848.50 W 561.64 S 2974.33 W 580.77 S 3098.79 W 600.20 S 3217.89 W 620.35 S 3335.29 W 1111.73 53.56 1173.1'9 61.47 1234.00 60.81 1290.7~ 56.74 1346.28 55.54 6879 5480.10 5400.00 7026 5580.10 5500.00 7172 5680.10 5600.00 7316 5780.10 5700~00 7460 5880.10 5800.00 640.81 S 3449.87 W 660.62 S 3555.85 W 683.99 S 3659.23 W 707.44 S 3760.68 W 734.67 S 3859.41 W 1399.74 53.46 1446.80 47.06 1492.52 45.72 1536.89 44.37 1580.05 43.16 7601 5980.10 5900.00 7742 6080.10 6000.00 7881 6180.10 6100.00 8020 6280.10 6200.00 8160 6380.10 6300.00 764.02 S 3955.40 W 796.45 S 4048.13 W 826.21 S 4140.52 W 848.47 S 4234.87 W 869.40 S 4330.18 W 1621.74 41.69 1661.94 40.20 1701.33 39.39 1740.62 39.29 1780.34 39.72 8303 6480.10 6400.00 8446 6580.10 6500.00 8592 6680.10 6600.00 8738 6780.10 6700.00 8886 6880.10 6800.00 890.42 S 4429.57 W 910.09 S 4530.77 W 929.11 S 4635.34 W 945~30 S 4739.85 W 964.16 S 4847.43 W 1822.90 42.56 1866.53 43.63 1912.47 45.94 1958.02 45.54 2006.13 48.11 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/D.S.13-31I 500292245900 NORTH SLOPE COMPUTATION DATE: 4/18/94 DATE OF SURVEY: 041494 JOB NUMBER: AK-MW-40032 KELLY BUSHING ELEV. = 80.10 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9036 6980.10 6900.00 977.81 S 4958.34 W 2056.09 49.96 9185 7080.10 7000.00 992.39 S 5068.09 W 2105.28 49.20 9331 7180.10 7100.00 1008.22 S 5173.81 W 2151.67 46.39 9474 7280.10 7200.00 1026.28 S 5274.74 W 2194.90 43.23 9617 7380.10 7300.00 1042.91 S 5374.79 W 2237.34 42.44 9764 7480.10 7400.00 1056.07 S 5482.00 W 2284.54 47.20 9911 7580.10 7500.00 1073.42 S 5587.86 W 2331.22 46.68 10055 7680.10 7600.00 1091.23 S 5690.17 W 2375.39 44.17 10194 7780.10 7700.00 1106.05 S 5785.13 W 2414.11 38.72 10331 7880.10 7800.00 1121.55 S 5877.91 W 2451.43 37.31 10473 7980.10 7900.00 1136.39 S 5978.18 W 2493.83 42.40 10618 8080.10 8000.00 1151.03 S 6081.91 W 2538.67 44.84 10762 8180.10 8100.00 1165.79 S 6184.40'W 2582.62 43.96 10905 8280.10 8200.00 1176.94 S 6285.42 W 2625.23 42.61 11056 8380.10 8300.00 1193.00 S 6397.49 W 2676.32 51.09 11208 8480.10 8400.00 1209.99 S 6511.23 W 2728.75 52.42 11357 85S0.10 8500.00 1228.38 S 6619.98 W 2777.65 48.90 11502 86S0.10 8600.00 1242.24 S 6723.92 W 2822.56 44.91 11648 8780.10 8700.00 1251.99 S 6829.24 W 2868.13 45.57 11789 8880.10 8800.00 1261.01 S 6929.12 W 2909.77 41.64 11927 8980.10 8900.00 1268.16 S 7023.18 W 2947.24 37.47 11973 9013.54 8933.44 1270.49 S 7054.18 W 2959.46 12.22 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS $ UB-$ URFA CE DIRECTIONAL SURVEY r~ UIDANCE F~ONTINUOUS r-~ OOL ORIOlNAL RECEIVED OCT 2 8 1994 Aiask,3 Oil & Gas Cons. Commission Anchor;.? Company ,.. ARCO ALASKA, INC. Well Name D.S. 13-31 (1579' FSL, 1423' FEL, SEC 14~ TION. R14E) Field/Location PRUOHOE BAY, NORTH SLOPE, ALASKA Job Reference No. 94181 Loa~ed By: ~ARNER Date 2-HAY-1994 Computed By; KRU~IELL * SCHLUMBERGER * GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALAS)CA SURVEY DATE: 2-MAY-94 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: ENGINEER: D. WARNER MINIMUM CURVATURE LINEAR HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 83 DEG 0 MIN WEST COMPUTATION DATE: 16-MAY-94 PAGE ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASK~A DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: 2-MAY-g4 82.30 FT D. WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA. COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -82.30 0 0 N 00 100.00 100.00 17.70 0 11 S 82 18 200.00 200.00 117.70 0 14 S 48 55 300.00 300.00 217.70 0 15 S 66 49 400.00 400.00 317.70 0 14 S 71 57 500.00 500.00 417.70 0 23 S 47 35 600.00 599.99 517.69 0 25 S 44 43 700.00 699.99 617.69 0 23 S 8 43 800.00 799.97 717.67 2 7 S 59 36 900.00 899.83 817.53 3 39 S 70 12 VERTICAL SECTION FEET 0.00 -0.17 -0.45 -0.77 -1.15 -1.55 -1.99 -2.35 -0.86 4.23 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 N 0.00 E 0.00 N 0 0 E 0.00 0.01 N 0.17 E 0.17 N 87 57 E 0.00 0.16 S 0.48 E 0.50 S 71 19 E 0.00 0.45 S 0.84 E 0.95 S 61 55 E 0.00 0.59 S 1.23 E 1.37 S 64 18 E 0.00 0.89 S 1.67 E 1.89 S 62 0 E 0.01 1.39 S 2.18 E 2.58 S 57 21 E 0.00 1.91 S 2.61 E 3.23 S 53 47 E 0.02 3.13 S 1.25 E 3.37 S 21 49 E 0.02 5.22 S 3.62 W 6.35 S 34 42 W 1000.00 999.59 917.29 4 13 S 73 2 1100.00 1099.27 1016.97 4 57 S 76 5 1200.00 1198.81 1116.51 6 26 S 79 31 1300.00 1297.88 1215.58 8 52 S 77 6 1400.00 1396.57 1314.27 9 46 S 76 46 1500.00 1495.01 1412.71 10 31 S 77 6 1600.00 1593.24 1510.94 11 6 S 78 21 1700.00 1691.30 1609.00 '11 32 S 82 24 1800.00 1789.16 1706.86 12 18 S 85 14 1900.00 1886.73 1804.43 13 19 S 86 9 W 11.01 W 18.82 W 28.37 W 41.85 W 57.90 W 75.38 W 94.01 W 113.58 W 134.16 W 156.04 0.01 7.41 S 10.18 W 12.59 S 53 57 W 0.01 9.54 S 17.79 W 20.19 S 61 47 W 0.01 11.47 S 27.18 W 29.50 S 67 7 W 0.02 14.35 S 40.40 W 42.87 S 70 27 W 0.01 18.03 S 56.12 W 58.94 S 72 12 W 0.01 22.05 S 73.24 W 76.49 S 73 15 W 0.01 26.10 S 91.51 W 95.16 S 74 5 W 0.01 29.43 S 110.82 W 114.66 S 75 8 W 0.01 31.61 S 131.29 W 135.04 S 76 28 W 0.01 33.29 S 153.12 W 156.70 S 77 44 W 2000.00 1983.34 1901.04 16 48 S 85 25 2100.00 2078.04 1995.74 20 23 S 82 40 2200.00 2170.86 2088.56 23 28 S 80 28 2300.00 2261.38 2179.08 26 45 S 79 9 2400.00 2349.84 2267.54 28 42 S 76 45 2500.00 2437.12 2354.82 29 47 S 77 29 2600.00 2523.19 2440.89 31 33 S 80 16 2700.00 2607.80 2525.50 32 45 S 80 20 2800.00 2691.50 2609.20 33 37 S 78 58 2900.00 2774.15 2691.85 35 1 S 78 21 W 181.77 W 213.83 W 250.99 W 293.38 W 339.82 W 388.34 W 439.10 w 492.36 W 546.98 W 603.10 0.02 35.09 S 178.83 W 182.24 S 78 54 W 0.03 38.40 S 210.73 W 214.20 S 79 40 W 0.03 43.93 S 247.48 W 251.35 S 79 56 W 0.03 51.39 S 289.27 W 293.80 S 79 56 W 0.01 61.05 S 334.87 W 340.39 S 79 40 W 0.01 72.16 S 382.40 W 389.15 S 79 lg W 0.01 82.06 S 432.32 W 440.04 S 79 15 W 0.02 90.75 S 484.92 W 493.33 S 79 24 W 0.02 100.69 S 538.72 W 548.05 S 79 25 W 0.01 111.70 S 593.92 W 604.33 S 79 21 W 3000.00 2855.33 2773.03 36 31 S 77 13 3100.00 2933.91 2851.61 40 0 S 77 26 3200.00 3008.76 2926.46 42 36 S 79 7 3300.00 3082.40 3000.10 42 39 S 77 43 3400.00 3155.14 3072.84 44 11 S 76 21 3500.00 3225.10 3142.80 46 41 S 76 54 3600.00 3294.33 3212.03 45 43 S 77 23 3700.00 3363.68 3281.38 46 49 S 76 31 3800.00 3430.93 3348.63 48 48 S 76 0 3900.00 3496.73 3414.43 48 44 S 75 40 W 661.24 W 722.73 W 788.82 W 856.27 W 924.49 W 995.46 W 1067.25 W 1138.89 W 1212.39 W 1287.09 0.01 124.12 S 650.96 W 662.69 S 79 12 W 0.02 137.85 S 711.24 W 724.47 S 79 2 W 0.03 151.06 S 776.20 W 790.76 S 78 59 W 0.02 164.62 S 842.49 W 858.42 S 78 57 W 0.02 180.21 S 909.30 W 926.99 S 78 47 W 0.02 196.92 S 978.76 W 998.37 S 78 37 W 0.02 212.86 S 1049.13 W 1070.51 S 78 32 W 0.02 229.16 S 1119.30 W 1142.52 S 78 26 W 0.01 246.66 S 1191.21 W 1216.48 S 78 18 W 0.01 265.14 S 1264.20 W 1291.71 S 78 9 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-g4 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA. COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 4000.00 3562.86 3480.56 48 26 S 75 38 W 4100.00 3629.38 3547.08 48 13 S 75 32 W 4200.00 3696.05 3613.75 48 5 S 75 23 W 4300.00 3763.17 3680.87 47 54 S 75 29 W 4400.00 3830.58 3748.28 47 19 S 75 29 W 4500.00 3898.81 3816.51 46 42 S 74 38 W 4600.00 3967.34 3885.04 47 7 S 75 3 W 4700.00 4034.74 3952.44 47 44 S 75 40 W 4800.00 4102.08 4019.78 47 32 S 75 44 W 4900.00 4169.81 4087.51 47 15 S 75 51 W 5000.00 4237.98 4155.68 46 47 S 75 44 W 5100.00 4306.65 4224.35 46 24 S 77 4 W 5200.00 4375.82 4293.52 46 8 S 77 53 W 5300.00 4444.88 4362.58 47 i S 80 10 W 5400.00 4512.50 4430.20 47 54 S 83 29 W 5500.00 4579.40 4497.10 48 32 S 85 57 W 5600.00 4645.09 4562.79 49 0 S 86 38 W 5700.00 4711.20 4628.90 '48 22 S 86 49 W 5800.00 4778.07 4695.77 47 43 S 87 5 W 5900.00 4844.61 4762.31 49 5 S 85 45 W 6000.00 4910.27 4827.97 49 33 S 87 24 W 6100.00 4973.62 4891.32 51 20 S 84 56 W 6200.00 5035.07 4952.77 52 19 S 83 12 W 6300.00 5096.20 5013.90 52 14 S 83 15 W 6400.00 5158.04 5075.74 51 40 S 81 20 W 6500.00 5220.80 5138.50 50 31 S 81 5 W 6600.00 5284.48 5202.18 50 33 S 81 26 W 6700.00 5347.90 5265.60 50 38 S 81 28 W 6800.00 5412.31 5330.01 49 37 S 79 38 W 6900.00 5477.54 5395.24 48 25 S 79 20 W ENGINEER: PAGE 2 2-MAY-94 82.30 FT D. WARNER 7000.00 5544.98 5462.68 47 31 S 77 53 W 7100.00 5612.85 5530.55 46 58 S 76 56 W 7200.00 5681.22 5598.92 46 46 S 76 49 W 7300.00 5749.94 5667.64 46 23 S 75 42 W 7400.00 5819.04 5736.74 46 9 S 73 23 W 7500.00 5888.64 5806.34 45 28 S 71 30 W 7600.00 5958.94 5876.64 44 55 S 71 12 W 7700.00 6029.79 5947.49 44 31 S 70 38 W 7800.00 6101.09 6018.79 44 36 S 73 21 W 7900.00 6172.40 6090.10 44 13 S 76 39 W VERTICAL SECTION FEET 1361.49 1435.53 1509.41 1582.90 1656.13 1728.53 1800.60 1873.82 1947.16 2020.14 2092.72 2164.89 2236.78 2308.90 2382.55 2456.83 2532.09 2606.97 2681.15 2755.63 2830.93 2908.16 2987.04 3066.18 3144.75 3222.56 3299.62 3376.91 3453.30 3528.98 3602.55 3675.64 3748.20 3820.38 3891.85 3962.42 4032.05 4101.08 4169.83 4239.22 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.01 283.76 S 1336.87 W 1366.66 S 78 1 W 0.00 302.33 S 1409.19 W 1441.26 S 77 53 W 0.00 321.05 S 1481.33 W 1515.72 S 77 46 W 0.01 339.71 S 1553.08 W 1589.79 S 77 40 W 0.01 358.17 S 1624.59 W 1663.61 S 77 34 W 0.01 377.08 S 1695.21 W 1736.64 S 77 28 W 0.01 396.24 S 1765.47 W 1809.39 S 77 21 W 0.01 414.86 S 1836.96 W 1883.22 S 77 16 W 0.01 433.09 S 1908.60 W 1957.12 S 77 13 W 0.01 451.18 S 1979.91 W 2030.67 S 77 10 W 0.00 469.15 S 2050.83 W 2103.81 S 77 7 W 0.01 486.56 S 2121.41 W 2176.49 S 77 5 W 0.01 502.11 S 2191.93 W 2248.70 S 77 6 W 0.01 516.25 S 2262.85 W 2320.99 S 77 9 W 0.02 526.27 S 2335.82 W 2394.38 S 77 18 W 0.02 533.22 S 2409.81W 2468.10 S 77 31W 0.02 537.90 S 2485.06 W 2542.61 S 77 47 W 0.01 542.26 S 2559.96 W 2616.76 S 78 2 W 0.01 546,17 S 2634.22 W 2690.24 S 78 17 W 0.01 550.62 S 2708.72 W 2764.12 S 78 31 W 0.01 555.40 S 2783.99 W 2838.85 S 78 43 W 0.01 560.39 S 2861.19 W 2915.56 S 78 55 W 0.01 569.02 S 2939.61 W 2994.17 S 79 3 W 0.01 578.28 S 3018.20 W 3073.10 S 79 9 W 0.01 589.33 S 3096.01 W 3151.60 S 79 13 W 0.01 601.07 S 3172.96 W 3229.39 S 79 16 W 0.01 613.06 S 3249.13 W 3306.46 S 79 19 W 0.01 624.33 S 3325.62 W 3383.71 S 79 22 W 0.01 637.43 S 3400.97 W 3460.19 S 79 23 W 0.01 650.83 S 3475.57 W 3535.98 S 79 24 W 0.02 665.93 S 3547.84 W 3609.79 S 79 22 W 0.02 681.92 S 3619.51 W 3683.19 S 79 20 W 0.01 698.51 S 3690.58 W 3756.10 S 79 17 W 0.01 715.50 S 3761.21 W 3828.66 S 79 14 W 0.01 734.94 S 3830.83 W 3900.70 S 79 8 W 0.01 756.63 S 3899.28 W 3972.01 S 79 1 W 0.01 779.50 S 3966.62 W 4042.48 S 78 53 W 0.01 802.45 S 4033.35 W 4112.40 S 78 45 W 0.01 824.41 S 4099.92 W 4181.99 S 78 38 W 0.02 842.77 S 4167.57 W 4251.93 S 78 34 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA. COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 8000.00 6243.87 6161.57 44 34 S 78 40 W 8100.00 6315.25 6232.95 44 30 S 78 16 W 8200.00 6386.02 6303.72 45 26 S 78 58 W 8300.00 6455.53 6373.23 45 58 S 79 25 W 8400.00 6524.96 6442.66 45 55 S 79 19 W 8500.00 6593.80 6511.50 46 58 S 79 49 W 8600.00 6661.67 6579.37 47 18 S 80 40 W 8700.00 6730.02 6647.72 47 9 S 81 8 W 8800.00 6797.66 6715.36 47 51 S 81 3 W 8900.00 6864.44 6782.14 47 56 S 82 18 W 9000.00 6931.17 6848.87 48 34 S 82 49 W 9100.00 6997.13 6914.83 48 37 S 81 25 W 9200.00 7064.16 6981.86 47 12 S 81 28 W 9300.00 7132.38 7050.08 47 4 S 80 40 W 9400.00 7201.01 7118.71 46 9 S 80 20 W 9500.00 7270.68 7188.38 45 27 S 80 16 W 9600.00 7340.29 7257.99 46 57 S 81 9 W 9700.00 7407.74 7325.44 '47 30 S 82 6 W 9800.00 7475.63 7393.33 46 56 S 81 59 W 9900.00 7543.39 7461.09 47 24 S 81 16 W 10000.00 7611.62 7529.32 46 26 S 81 3 W 10100.00 7681.70 7599.40 44 34 S 80 47 W 10200.00 7754.43 7672.13 42 26 S 79 50 W 10300.00 7828.12 7745.82 43 23 S 79 29 W 10400.00 7898.81 7816.51 45 37 S 79 47 W 10500.00 7968.09 7885.79 46 36 S 80 36'W 10600.00 8036.42 7954.12 46 47 S 80 33 W 10700.00 8105.54 8023.24 46 13 S 80 51 W 10800.00 8175.38 8093.08 45 5 S 82 29 W 10900.00 8245.65 8163.35 46 46 S 82 6 W ENGINEER: PAGE 3 2-MAY-94 82.30 FT D. WARNER 11000.00 8311.95 8229.65 49 20 S 79 38 W 11100.00 8377.14 8294.84 49 i S 80 27 W 11200.00 8442.52 8360.22 48 59 S 78 22 W 11300.00 8508.81 8426.51 47 58 S 79 12 W 11400.00 8576.53 8494.23 46 49 S 81 15 W 11500.00 8645.58 8563.28 45 58 S 83 18 W 11600.00 8714.50 8632.20 46 33 S 83 45 W 11700.00 8783.79 8701.49 45 27 S 83 10 W 11800.00 8854.86 8772.56 44 2 S 84 42 W 11900.00 8927.29 8844.99 43 22 S 85 46 W VERTICAL SECTION FEET DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 4308.88 0.02 857.40 S 4235.97 W 4321.87 S 78 33 W 4378.70 0.01 871.37 S 4304.59 W 4391.90 S 78 33 W 4449.14 0.01 885.30 S 4373.85 W 4462.54 S 78 33 W 4520.87 0.01 898.81 S 4444.46 W 4534.43 S 78 34 W 4592.69 0.01 912.09 S 4515.19 W 4606.40 S 78 35 W 4665.09 0.01 925.29 S 4586.51 W 4678.92 S 78 36 W 4738.44 0.01 937.82 S 4658.87 W 4752.33 S 78 37 W 4811.39 0.01 949.19 S 4730.97 W 4825.26 S 78 39 W 4884.gg 0.01 960.71 S 4803.72 W 4898.85 S 78 41 W 4959.40 0.01 971.75 S 4877.33 W 4973.19 S 78 44 W 5033.88 5109.03 5183.20 5256.28 5328.94 5400.59 5472.31 5546.12 5619.53 5693.05 5766.12 5837.40 5905.96 5973.41 6044.00 6116.02 6188.97 6261.18 6332.72 6403.86 6478.66 6554.37 6629.91 6704.55 6778.04 6850.35 6922.81 6994.91 7065.24 7134.12 0.01 981.06 S 4951.23 W 5047.49 S 78 48 W 0.01 991.29 S 5025.68 W 5122.51 S 78 51 W 0.01 1002.59 S 5099.02 W 5196.65 S 78 53 W 0.01 1013.75 S 5171.28 W 5269.71 S 78 55 W 0.01 1025.92 S 5242.99 W 5342.42 S 78 56 W 0.01 1037.97 S 5313.70 W 5414.13 S 78 57 W 0.01 1049.76 S 5384.51 W 5485.89 S 78 58 W 0.01 1060.36 S 5457.57 W 5559.63 S 79 0 W 0.01 1070.48 S 5530.30 W 5632.95 S 79 3 W 0.01 1081.15 S 5603.06 W 5706.41 S 79 5 W 0.01 1092.32 S 5675.30 W 5779.47 S 79 6 W 0.01 1103.46 S 5745.75 W 5850.75 S 79 8 W 0.02 1115.03 S 5813.40 W 5919.37 S 79 9 W 0.01 1127.57 S 5879.82 W 5986.96 S 79 g W 0.01 1140.20 S 5949.39 W 6057.67 S 79 9 W 0.02 1152.55 S 6020.44 W 6129.77 S 79 10 W 0.01 1164.48 S 6092.47 W 6202.76 S 79 11 W 0.01 1176.23 S 6163.78 W 6275.00 S 79 12 W 0.01 1186.64 S 6234.57 W 6346.50 S 79 13 W 0.02 1195.69 S 6305.14 W 6417.51 S 79 16 W 0.02 1207.21 S 6379.09 W 6492.31 S 79 17 W 0.02 1220.70 S 6453.71 W 6568.14 S 79 17 W 0.02 1234.02 S 6528.18 W 6643.79 S 79 18 W 0.01 1248.88 S 6601.56 W 6718.65 S 79 17 W 0.02 1261.50 S 6674.05 W 6792.22 S 79 18 W 0.02 1271.19 S 6745.71 W 6864.44 S 79 20 W 0.02 1279.49 S 6817.69 W 6936.72 S 79 22 W 0.01 1287.72 S 6889.32 W 7008.64 S 79 25 W 0.01 1295.23 S 6959.26 W 7078.77 S 79 27 W 0.02 1300.72 S 7027.99 W 7147.34 S 79 31 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN PAGE 4 2-MAY-g4 82.30 FT ENGINEER: D. WARNER 12000.00 9000.11 8917.81 43 16 S 86 6 W 12100.00 9072.93 8990.63 43 16 S 86 6 W 12150.00 9109.34 9027.04 43 16 S 86 6 W SECTION FEET 7202.57 7271.01 7305.23 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.00 1305.58 S 7096.35 W 7215.45 S 79 35 W 0.00 1310.26 S 7164.73 W 7283.55 S 79 38 W 0.00 1312.59 S 7198.92 W 7317.61 S 79 40 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA. COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -82.30 0 0 N 0 0 E 1000.00 999.59 917.29 4 13 S 73 2 W 2000.00 1983.34 1901.04 16 48 S 85 25 W 3000.00 2855.33 2773.03 36 31 S 77 13 W 4000.00 3562.86 3480.56 48 26 S 75 38 W 5000.00 4237.98 4155.68 46 47 S 75 44 W 6000.00 4910.27 4827.97 49 33 S 87 24 W 7000.00 5544.98 5462.68 47 31 S 77 53 W 8000.00 6243.87 6161.57 44 34 S 78 40 W 9000.00 6931.17 6848.87 48 34 S 82 49 W ENGINEER: PAGE 5 2-MAY-g4 82.30 FT D. WARNER 10000.00 7611.62 7529.32 46 26 S 81 3 W 11000.00 8311.95 8229.65 49 20 S 79 38 W 12000.00 9000.11 8917.81 43 16 S 86 6 W 12150.00 9109.34 9027.04 43 16 S 86 6 W VERTICAL SECTION FEET 0.00 11.01 181.77 661.24 1361.49 2092.72 2830.93 3602.55 4308.88 5033.88 5766.12 6478.66 7202.57 7305.23 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 N 0.00 E 0.00 N 0 0 E 0.01 7.41 S 10.18 W 12.59 S 53 57 W 0.02 35.09 S 178.83 W 182.24 S 78 54 W 0.01 124.12 S 650.96 W 662.69 S 79 12 W 0.01 283.76 S 1336.87 W 1366.66 S 78 1 W 0.00 469.15 S 2050.83 W 2103.81 S 77 7 W 0.01 555.40 S 2783.99 W 2838.85 S 78 43 W 0.02 665.93 S 3547.84 W 3609.79 S 79 22 W 0.02 857.40 S 4235.97 W 4321.87 S 78 33 W 0.01 981.06 S 4951.23 W 5047.49 S 78 48 W 0.01 1092.32 S 5675.30 W 5779.47 S 79 6 W 0.02 1207.21 S 6379.09 W 6492.31 S 79 17 W 0.00 1305.58 S 7096.35 W 7215.45 S 79 35 W 0.00 1312.59 S 7198.92 W 7317.61 S 79 40 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA. COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTN DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -82.30 0 0 N 00 E 82.30 82.30 0.00 0 10 N 89 17 E 182.30 182.30 100.00 0 13 S 50 21 E 282.30 282.30 200.00 0 16 S 60 41 E 382.30 382.30 300.00 0 14 S 71 6 E 482.30 482.30 400.00 0 22 S 47 42 E 582.31 582.30 500.00 0 25 S 44 47 E 682.31 682.30 600.00 0 21 S 33 24 E 782.32 782.30 700.00 1 37 S 56 21 W 882.44 882.30 800.00 3 32 S 69 29 W 982.67 982.30 900.00 4 6 S 72 7 W 1082.97 1082.30 1000.00 4 43 S 75 I W 1183.39 1182.30 1100.00 6 0 S 79 32 W 1284.24 1282.30 1200.00 8 34 S 77 11 W 1385.52 1382.30 1300.00 9 37 S 76 46 W 1487.08 1482.30 1400.00 10 25 S 76 57 W 1588.85 1582.30 1500.00 11 2 S 78 4 W 1690.81 1682.30 1600.00 '11 29 S 81 59 W 1792.98 1782.30 1700.00 12 15 S 85 4 W 1895.45 1882.30 1800.00 13 14 S 86 5 W 1998.92 1982.30 1900.00 16 46 S 85 27 W 2104.55 2082.30 2000.00 20 31 S 82 32 W 2212.51 2182.30 2100.00 23 54 S 80 19 W 2323.49 2282.30 2200.00 27 18 S 78 43 W 2437.06 2382.30 2300.00 29 3 S 76 30 W 2552.26 2482.30 2400.00 30 35 S 78 45 W 2669.73 2582.30 2500.00 32 27 S 80 45 W 2788.95 2682.30 2600.00 33 31 S 78 58 W 2909.97 2782.30 2700.00 35 9 S 78 17 W 3033.76 2882.30 2800.00 37 28 S 77 5 W ENGINEER: PAGE 6 2-MAY-g4 82.30 FT D. WARNER 3164.21 2982.30 2900.00 42 2 S 78 53 W 3299.87 3082.30 3000.00 42 39 S 77 43 W 3438.26 3182.30 3100.00 45 21 S 76 19 W 3582.76 3282.30 3200.00 45 49 S 77 25 W 3727.27 3382.30 3300.00 47 5 S 76 31 W 3878.09 3482.30 3400.00 48 50 S 75 44 W 4029.28 3582.30 3500.00 48 21 S 75 38 W 4179.40 3682.30 3600.00 48 13 S 75 25 W 4328.50 3782.30 3700.00 47 47 S 75 32 W 4475.90 3882.30 3800.00 46 48 S 74 43 W VERTICAL SECTION FEET 0.00 -0.11 -0.41 -0.71 -1.09 -1.48 -1.91 -2.33 -1.39 3.15 9.77 17.39 26.58 39.48 55.47 73.05 91.87 111.75 132.68 155.01 181.47 215.41 256.04 304.04 357.60 414.52 476.07 540.87 608.82 681.44 764.79 856.18 951.24 1054.96 1158.68 1270.74 1383.20 1494.21 1603.84 1711.16 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 N 0.00 E 0.00 N 0 0 E 0.01 0.01 N 0.11 E 0.11 N 85 6 E 0.00 0.12 S 0.42 E 0.44 S 74 41 E 0.00 0.41 S 0.76 E 0.87 S 61 43 E 0.00 0.57 S 1.17 E 1.30 S 63 54 E 0.00 0.81 S 1.59 E 1.78 S 62 54 E 0.01 1.30 S 2.09 E 2.46 S 58 0 E 0.00 1.81 S 2.57 E 3.14 S 54 50 E 0.01 2.83 S 1.74 E 3.32 S 31 41 E 0.02 4.84 S 2.58 W 5.49 S 28 4 W 0.01 7.03 S 8.98 W 11.41 S 51 56 W 0.01 9.18 S 16.40 W 18.79 S 60 45 W 0.01 11.15 S 25.41 W 27.75 S 66 19 W 0.02 13.82 S 38.08 W 40.50 S 70 3 W 0.01 17.47 S 53.75 W 56.51 S 72 0 W 0.01 21.52 S 70.96 W 74.15 S 73 8 W 0.01 25.66 S 89.41 W 93.02 S 73 59 W 0.01 29.17 S 109.01 W 112.85 S 75 1 W 0.01 31.48 S 129.81 W 133.57 S 76 22 W 0.01 33.22 S 152.10 W 155.68 S 77 41 W 0.02 35.06 S 178.53 W 181.94 S 78 53 W 0.03 38.60 S 212.29 W 215.77 S 79 42 W 0.03 44.77 S 252.46 W 256.40 S 79 57 W 0.03 53.45 S 299.76 W 304.49 S 79 53 W 0.01 65.19 S 352.28 W 358.26 S 79 31 W 0.01 77.57 S 408.11 W 415.41 S 79 14 W 0.02 88.06 S 468.83 W 477.03 S 79 22 W 0.02 99.51 S 532.71 W 541.92 S 79 25 W 0.01 112.87 S 599.54 W 610.07 S 79 20 W 0.02 128.64 S 670.76 W 682.99 S 79 9 W 0.02 146.46 S 752.55 W 766.67 S 78 59 W 0.02 164.60 S 842.40 W 858.33 S 78 57 W 0.02 186.58 S 935.48 W 953.90 S 78 43 W 0.02 210.17 S 1037.08 W 1058.16 S 78 33 W 0.02 233.81 S 1138.68 W 1162.43 S 78 24 W 0.01 261.07 S 1248.23 W 1275.24 S 78 11 W 0.01 289.20 S 1358.08 W 1388.53 S 77 59 W 0.00 317.18 S 1466.49 W 1500.40 S 77 48 W 0.01 344.99 S 1573.52 W 1610.90 S 77 38 W 0.01 372.44 S 1678.28 W 1719.11 S 77 29 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 4622.05 3982.30 3900.00 47 30 S 75 15 W 4770.67 4082.30 4000.00 47 41 S 75 46 W 4918.39 4182.30 4100.00 47 8 S 75 52 W 5064.61 4282.30 4200.00 46 38 S 76 12 W 5209.35 4382.30 4300.00 46 3 S 77 58 W 5355.13 4482.30 4400.00 47 26 S 82 43 W 5504.39 4582.30 4500.00 48 36 S 86 I W 5656.42 4682.30 4600.00 48 32 S 86 39 W 5806.29 4782.30 4700.00 47 43 S 87 6 W 5957.24 4882.30 4800.00 48 49 S 86 17 W 6114.00 4982.30 4900.00 5.140 S 84 28 W 6277.32 5082.30 5000.00 52 11 S 83 21 W 6438.95 5182.30 5100.00 51 17 S 81 25 W 6596.56 5282.30 5200.00 50 32 S 81 24 W 6753.67 5382.30 5300.00 49 39 S 79 40 W 6907.14 5482.30 5400.00 48 10 S 79 0 W 7055.13 5582.30 5500.00 47 15 S 77 22 W 7201.57 5682.30 5600.00 46 46 S 76 49 W 7346.89 5782.30 5700.00 46 20 S 74 21 W 7490.95 5882.30 5800.00 45 35 S 71 37 W 7633.03 5982.30 5900.00 45 4 S 71 6 W 7773.66 6082.30 6000.00 44 20 S 72 40 W 7913.81 6182.30 6100.00 44 8 S 77 9 W 8053.89 6282.30 6200.00 44 22 S 78 29 W 8194.69 6382.30 6300.00 45 27 S 78 56 W 8338.60 6482.30 6400.00 46 15 S 79 21 W 8483.20 6582.30 6500.00 46 39 S 79 43 W 8630.35 6682.30 6600.00 46 55 S 81 2 W 8777.12 6782.30 6700.00 47 46 S 81 0 W 8926.71 6882.30 6800.00 48 11 S 82 41 W ENGINEER: PAGE 7 2-MAY-g4 82.30 FT D. WARNER 9077.57 6982.30 6900.00 48 32 S 81 44 W 9226.59 7082.30 7000.00 46 42 S 81 31 W 9372.93 7182.30 7100.00 46 23 S 80 19 W 9516.57 7282.30 7200.00 45 30 S 80 14 W 9662.20 7382.30 7300.00 47 51 S 81 56 W 9809.80 7482.30 7400.00 46 55 S 81 56 W 9957.31 7582.30 7500.00 46 50 S 81 17 W 10100.83 7682.30 7600.00 44 33 S 80 47 W 10237.73 7782.30 7700.00 42 17 S 79 9 W 10376.39 7882.30 7800.00 45 39 S 79 50 W VERTICAL SECTION FEET 1816.64 1925.67 2033.53 2139.37 2243.49 2349.37 2460.13 2574.42 2685.79 2798.65 2919.15 3048.26 3175.20 3296.97 3418.07 3534.29 3642.95 3749.34 3853.99 3956.08 4054.90 4151.66 4248.79 4346.55 4445.37 4548.62 4652.86 4760.69 4868.05 4979.26 5092.21 5202.64 5309.39 5412.38 5518.16 5626.71 5735.12 5837.99 5931.34 6027.15 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.01 400.40 S 1781.12 W 1825.57 S 77 20 W 0.01 427.75 S 1887.61 W 1935.47 S 77 14 W 0.00 454.48 S 1993.00 W 2044.17 S 77 9 W 0.00 480.62 S 2096.43 W 2150.82 S 77 5 W 0.01 503.52 S 2198.52 W 2255.44 S 77 6 W 0.02 522.31 S 2302.88 W 2361.37 S 77 13 W 0.02 533.44 S 2413.11 W 2471.36 S 77 32 W 0.02 540.40 S 2527.40 W 2584.53 S 77 56 W 0.01 546.41 S 2638.86 W 2694.84 S 78 18 W 0.01 553.59 S 2751.70 W 2806.83 S 78 38 W 0.01 561.46 S 2872.13 W 2926.49 S 78 56 W 0.01 576.18 S 3000.41 W 3055.23 S 79 8 W 0.01 593.90 S 3126.12 W 3182.04 S 79 15 W 0.01 612.66 S 3246.50 W 3303.80 S 79 lg W 0.01 631.05 S 3366.26 W 3424.g0 S 79 23 W 0.01 651.84 S 3480.79 W 3541.30 S 79 24 W 0.02 674.58 S 3587.48 W 3650.35 S 79 21 W 0.01 698.77 S 3691.70 W 3757.25 S 79 17 W 0.01 724.23 S 3794.01 W 3862.51 S 79 12 W 0.01 754.59 S 3893.14 W 3965.60 S 79 2 W 0.01 787.05 S 3988.72 W 4065.62 S 78 50 W 0.01 819.03 S 4082.28 W 4163.63 S 78 39 W 0.02 844.96 S 4176.95 W 4261.55 S 78 34 W 0.02 864.87 S 4273.00 W 4359.65 S 78 33 W 0.01 884.58 S 4370.14 W 4458.76 S 78 33 W 0.01 903.93 S 4471.79 W 4562.23 S 78 34 W 0.01 923.11 S 4574.46 W 4666.67 S 78 35 W 0.01 941.38 S 4680.85 W 4774.57 S 78 38 W 0.01 958.06 S 4786.97 W 4881.90 S 78 41 W 0.01 974.35 S 4897.02 W 4993.01 S 78 45 W 0.02 988.82 S 5009.04 W 5105.71 S 78 50 W 0.02 1005.47 S 5118.25 W 5216.08 S 78 53 W 0.01 1022.63 S 5223.70 W 5322.86 S 78 55 W 0.01 1039.97 S 5325.34 W 5425.93 S 78 57 W 0.01 1056.47 S 5429.88 W 5531.70 S 78 59 W 0.01 1071.48 S 5537.41 W 5640.12 S 79 3 W 0.01 1087.57 S 5644.65 W 5748.47 S 79 6 W 0.01 1103.55 S 5746.33 W 5851.34 S 79 8 W 0.02 1119.69 S 5838.40 W 5944.80 S 79 9 W 0.01 1137.21 S 5932.78 W 6040.79 S 79 9 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 DATE OF SURVEY: KELLY BUSHING ELEVATION: INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 10520.75 7982.30 7900.00 46 55 S 80 37 W 10666.51 8082.30 8000.00 45 53 S 80 37 W 10809.79 8182.30 8100.00 44 59 S 82 40 W 10954.65 8282.30 8200.00 48 51 S 81 13 W 11107.88 8382.30 8300.00 49 2 S 80 32 W 11260.24 8482.30 8400.00 48 23 S 78 36 W 11408.42 8582.30 8500.00 46 45 S 81 25 W 11553.10 8682.30 8600.00 46 39 S 83 19 W 11697.87 8782.30 8700.00 45 29 S 83 9 W 11838.03 8882.30 8800.00 43 38 S 85 29 W ENGINEER: PAGE 8 2-MAY-94 82.30 FT D. WARNER 11975.53 8982.30 8900.00 43 16 S 86 4 W 12112.86 9082.30 9000.00 43 16 S 86 6 W 12150.00 9109.34 9027.04 43 16 S 86 6 W VERTICAL SECTION FEET 6131.14 6237.08 6339.65 6444.38 6560.32 6675.00 6784.17 6888.71 6993.38 7091.55 7185.81 7279.81 7305.23 DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEG/IO0 FEET FEET FEET DEG MIN 0.02 1155.02 S 6035.37 W 6144.89 S 79 10 W 0.01 1172.34 S 6139.98 W 6250.90 S 79 11 W 0.01 1187.54 S 6241.44 W 6353.42 S 79 14 W 0.02 1201.58 S 6345.24 W 6458.01 S 79 17 W 0.02 1221.68 S 6459.58 W 6574.09 S 79 17 W 0.02 1243.16 S 6572.49 W 6689.02 S 79 17 W 0.02 1262.41 S 6680.11 W 6798.35 S 79 18 W 0.02 1275.62 S 6783.82 W 6902.71 S 79 21 W 0.01 1287.54 S 6887.81 W 7007.12 S 79 25 W 0.01 1297.47 S 6985.50 W 7104.97 S 79 29 W 0.01 1304.41 S 7079.61 W 7198.78 S 79 34 W 0.00 1310.86 S 7173.53 W 7292.32 S 79 39 W 0.00 1312.59 S 7198.92 W 7317.61 S 79 40 W ARCO ALASICA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 16-MAY-94 MARKER LAST READING GCT TD INTERPOLATED VALUES FOR CHOSEN HORIZONS DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: PAGE 9 2-MAY-g4 82.30 FT D. WARNER SURFACE LOCATION = 1579' FSL & 1423' FEL, SEC14 TION R14E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 11980.03 8985.58 8903.28 1304.63 S 7082.69 W 12150.00 9109.34 9027.04 1312.59 S 7198.92 W ARCO ALASKA, INC. D.S. 13 - 31 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER LAST READING GCT TD COMPUTATION DATE: 16-MAY-94 STRATIGRAPHIC SUMMARY MEASURED DEPTH BELOW KB 11980.03 12150.00 DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: SURFACE LOCATION : 1579' FSL & 1423' FEL, SEC14 TION R14E TVD RECTANGULAR COORDINATES FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 8985.58 8903.28 1304.63 S 7082.69 W 9109.34 9027.04 1312.59 S 7198.92 W PAGE 10 2-MAY-94 82.30 FT D. WARNER FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 12150.00 9109.34 902'7.04 7317.61 S 79 40 W COMPANY ARCO ALASKA, INC. FIELD D.S. 13 - 31 WELL PRUDHOE BAY COUNTRY USA DATE LOGGED 2-MAY-94 REFERENCE 94181 gm a altee tle acc(ir~tc¥ or co~rect~ ~e~ ot any interpfelalions, and w~ U]atl no[ except In ~ c~e gf Uros~ 9r w~l~ull ,~e~l gencu o~ o~ part, be li~le or ~esponable for any Io~, coa~. dam~ee ~ ex~n~e ~curre~ ~ a~3~ Dy arc,one ~esulti~ ,g from a~ ,y i~[erp~etafioq ~ade by ~r~ ol 9~r officers, .age~ or e~nptoy~. I ~e~ ~ot~rpre~t~s are ~so subject to o[.~r ~erleral/erms al'lQ uonal~ons ~ ~[ OUt In our curren[ pnce ~aUle. .............. , WELL' D.S. 13-31 (1579' FSL, 1423' FEL, SEC 14, TION, R14E) HORIZONTAL PROdECTION NORTH 8000 6OOO 4000 2OO0 -2000 -4000 -6000 SOUTH -8000 REF 94181 SCALE = I / 2000 IN/FT -10000 -8000 -6000 -4000 -2000 0 2000 4000 6000 WEST EAST I~ELL: D.S. 13-31 (1579' FSL, 1423' FEL, SEC 14, TION, R14E) VERTICAL PROdECTION $3.0 -4000 -2000 0 0 2000 4000 6000 8000 10000 12000 2~s .o PROJECTION ON VERTICAL PLANE 83.0 - 263.0 SCALED IN VERTICAL DEPTHS HORIZ ~CALE = 1 / 2000 IN/FT '4 ARCO Alaska, Inc. Date: September 20, 1994 P.O. Box 10036( t\nchorage, AK Transmittal #: 94111 99610~ ~, Subject: From/Location: Telephone: To/Location: ARCO Static Pressure Survey's Karla Zuspan/ATO-1529 . (907) 263-4310 Distribution Number ~ (M-D-Y) . 04-19 ~ 05-23-94t Pressure Survey ! I SCH 04-45i ! 07-05-94 ! Pressure Survey/ [ 1 SCH 11-29i f 07'08'94 ! Pressure Survey{ 1 $CH 11-36 $ 06-09-941 PressureSurve¥ ! 1 SCH 12-07A i 06-06-94 ! Pressure Survey/ i 1 $CH 12-10A i 06-07-94t Pressure Survey 12-12 i 06-08-94i Pressure Survey i 1 SCH 12-16A $ 07-07-94 1 Pressure Survey i 1 $CH 12-26 $ 06-08-94t Pressure Survey i 1 SCH 13-31 J 06-09-94t PressureSurve¥{: 1 SCH .... 13-35 i 06-09-94 i Pressure Survey { 1 t SCH ~,'c~ j 18-01 j06-04-94j Pressure Survey i 1 SCH 18-08 i 06-10-94~, Pressure Survey i ! I SCH Number of Records: 13 Karla Zuspan Distribution: Central Files BPX State of Alaska Mobil Please edge receipt By Phillips Exxon D&M Date: ismi ARCO AlasKa, inc. Is a S,e,sldlary of AllanlleRl¢ltflMdCompmty , ARCO Alaska, inc. Date: Subject: From/Location: Telephone: To/Location: June 21, 1994 ARCO Cased Hole ~Finais John E. DeGrey/ATO- 1529 (907) 263-4310 Distribution Well i Log Datei Tool Type i R un,i Number. (M-D-Y) i Scale 1-05ST i 6-13-94 Dual Burst I 1, 5" 1-06.i 6-13-94 f Dual Burst i. 1, 5" 1-11 i 6-14-94 1' Perf Record ! 1, 5" 1-25 ! 6-10-94 / Perf Record i 1, 5" 1-29 { 6-14-94 / Dual Burst i 1,5" 1-30 ! 6-08-94 / CNL i 1, 5" · Tubing Cutter ! 1, 5" Perf Record { 1, 5" Perf Record i 1, 5" 11 3-02 ! 6-07-94 3-19 ! 6-05-94 4-36 i 6-11-94 4-41 I 6-12-94 5-11 I 6-11-94 9-15 !6-13-94 ! 9-25 { 6-i4-94 11-35 i 6-11-94 '-/Cutter Record i 1 5" ~' Dual Burst i 1 5" / Ini Prof i 1 5" / Inj Prof i 1 /' inj Prof I I / Perf Record l I 11-36 I 6-07-94 /Perf Record i 1 5" 13-31 f 6-09-94 '"' Perf Record i 1 5" 13-35 I 6-09-94I Perf Record i 1 5" 14-03 i 6-15-94 j ~- Prod Log ! 1 5" 14-03 , 6-15-94 I~ DualBurst j 1 5" 16-23 i . 6-13-94 Leak Detection 1, 5" 16-23 ! 6-10-94 Tubir i 1,5" 17-02 i 6-6-94 ~ Prod Pmf 1, 1"&5" I 18-02 6-12-94 ~ PerfRecord f 1,5" 18-04 f 6-12-94 ," Dual Burst 1, 5" 18-19 j 6-10-94 --'Leak Detection ~ 1, 1" & 5" Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch * The correct APl # for 1-05ST is 50-029-20076-00 Number of Records: E. DeGrey Distribution: Central Files ANO-8 Geology Exxon Mobil Phillips BPX State of Alaska- ARCO AlaslcK Inc. Is a SUl~$1dlary o! AtlantlcRIchfieidCompany ARCO Alaska, Inc. Date: May 24, 1994 P.O. Box 100360, horage, AK Transmittal #: 94040 99510~g~ ~ ,,/ J Subject: From/Location: Telephone: To/Location: ARCO Cased Hole Finals John E. DeGrey/ATO- 1529 (907i 263-4310 Distribution iWell i'LOg DateNumber (M-D-Y) T°°l Type i RUn'scale C°ntract°r ! ~©"' ~L;5~ OWDW-sw 4-29-94 ,/// PITS I 1, 5" SCH ~"-- 53 1-9A 5-14-94 ,,/"~/Perf Rec i 1, 5" scH t~.--i I~o i 1-20 5-7-94 v/ Perf Rec I 1, 5" SCH tO--- t T ',/! 2-4 5-11-94 v/ Prod Prof ! 1, 5" SCH 'kj 2-4 5-11-94 ,/'. CNL 1, 5" SCH ~0- ~ ,,'/! 2-5 5-7-94 !v-" Prod Pmf I 1, 5" SCH \ 2-5 5-7-94 v/ CNL ~ 1, 5" SCH )0-[X(~ 2-18 ,5,-8-94 ~/~ Prod Pmf . 1, 5" SCH 1,).---I~c~ //,2-20 i 4-30-94 ~/Prod Prof 1, 5" SCH t ~i 2-20I 5-13-94 ,./ CNL 1, 5" SCH ~- ~7..l 3-19~{ 4-4-94 ~/..~/i Bridge Plug 1,5" SCH c{.--['~ I 3-29 5-3-94 Bridge Plu~ ! 1, 5" SCH l(~'" i~[ '/I 3-32A I 5-9-94 vUSIT (Cem& Con') ! 1, 5" SCH ~' i<~-'/l 4-5A ~ 5-17-944 vx Perf Rec ~ 1, 5" SCH k~-4-5A 5-17-94 ~ USIT i 1,.5", SCH -'~c~.-~50 5-6 4-30-94 ,/ Prod Pmf 1, 5" SCH ;[~-! (~ 5-35 5-3-94 ,/ TDT-P , 1, 5" SCH · 5" SCH ir~-'' ~ 6-10 4-5-94 v/ Leak Detect 1~ .c[~ [~O' 6-11 5-14-94 -',-Packer Set Rec 1, 5" SCH '5---~j~ 6-22A 5-14-94 v" Perf Rec 1, 5" SCH !~).~.= It ~ . 7-3 i 5-8-94 i,/' "Prod Prof . 1~.5" SCH .~. 7-3 5-7-04 !v"~, Perf Rec 1, 5" SCH [t{~ 7-23 5-10-94 !vOeweirySetRec i, 1, 5' SCH 7-2,3 5-15-94 v/Completion Rec , 1, 5" SCH ~-- 0~) .,9-13 5;16-94 v/Bridge Plug 1, 5" SCH ~-' '5~. 9-26 4-6-94 v/ Perf Rec. 1, 5" SCH O- ~;Z 9-42 5-15-94 ~ Leak Detect 1, 1" 2" 5" ,. SCH '0-~1~(¢ 9-47 5-16-94 V PackerSet Rec 1, 5" SCH ,q'- L~ 11-36 5-18-g4 ,,/ USIT , 1, 5" SCH ~/- [{~'?' 12-8B 5-4-94 ,,," Prod Pmf 1, 1" 5" SCH ~1 -~q~ 13-8 5-2-94 v'~ Inj Pmf i 1, 5" SCH ~q- i z-/o 13-31 i 5-2-94 v/ USIT ! 1, 5" SCH · ~¥--iq/ , ,,13-35 I 5-10-94 ,/'" USIT , ,! 1, 5" SCH "(~-;L~(¢' , i 14-7 I 5-13-94 ,/Tubincj Patch Reci 1, 5" SCH ~l- ! ,~r-/' ........ 14-15 ~ 5-17-94 ~ CNL i 1,5" SCH ~_- i?~ 14-41 i 5-8-94 /Dual BurSt TDT-P i 1, 5" SCH ',i.- !¢~' 16-26 l 5-6-94' ~ Perf Rec i 1, 5" SCH r2..-i/11 17-19 5-12-94 v" "Perf Rec 1, 5" SCH ~L,..i~ 18-1 5-16-94 v" Perf Rec 1, 5" SCH ARCO AlasKA, Int. Is a Subsidiary of AtlantlcRIr..hfleldComl3mrly ARCO Alaska, Inc. Date: Apr 22, 1994 P.O. Box 100360,.~'~horage, AK Transmittal #: 94035 99S10~ ~, Subject- From/Location: ARCO Open Hole Finals John E. DeGrey/ATO- 1529 Telephone: (907) 263-4310 To/Location: Distribution Well Number .- 01-09A Log Date (M-D-Y) 03-17-94 01-09A 03-17-94 01-09A 03-17-94 01-09A 04-45 04-45 ~.~.0I 9-34A 9-34A * ~ 9-34A .-.---ii 12-13A ~t~-G~/ i 12-13A '~i 12-13A \i 12-13A Tool Type Dual Lateroio~ SSTVD 1/ BHCA/GR 03-17-94 I/,. CNL/GR 03-18-94 t 'MWD/TVD:DGR, 1. EWR-P4 03-18-94 i/MWD/MD:DGR, I EWR-P4 03-30-94 i ¢I'vlWD/MD:GRC, i EWR,FXE 03-30-94i j~lWDFI'VD:G RC, ! / EWR.FXE 04-19-94 i,/ Slimhole ' 03-31-94 i¢ MWD: SSTVD 03-31-9~i,¢/ BHCA/GR ' · 03-31-94 i~/ CNL/GR : 03-31-94 i,,/ Dual Lareroio9 , Run, Scale 1. 2"&5" 1, 1"&2" 1. 2"&5" 1. 2"&5" 1. 2"&5" 1. 2"&5" 1-7~ 2"&5" 1-7, 2"&5" 1, 2" 1. 1"&2" 1. 2"&5" 1. 2"&5" 1. 2"&5" 13-31 04-14-94 ,/MWD/MD:GRC 1 2"&5" Contractor Atlas Atlas Atlas Atlas Sperry Sperry Sperry Sperry Sperry Atlas Atlas Atlas , Atlas i I EWR,FXE i t i,4vlWDfTVD:GRC, 1, 2"&5" Sperry 13-31 i. 04'14'94I EWR,FXE i 13-35 [ 03-31-94ivfvlWD/MD:GRC, ' 1, 2"&5" Sperry i i EWR,FXE i 13-35 i 03-31-94 V~MWD/TVD:GRC, i 1, 2"&5" Sperry ~ EWR,FXE ~ 03- -94 i¢' S,mho e i 1, Spe r 15-33 i 03'29-94 tvMWD/'I'VD: DGR, I 1-9, 2"&5" Sperry 15-33 03-29-94 I ~MWD/'I'V~: D~R, i 1-20 2"&5" Sperry i ]-- EWR,FXE i ; 1-20 2"&5"I Sperry i o3- s- 4 , ; EWR,FXE { * v'lncludes spiral notebook and disk ** DS#15 logs are Pilot Hole Number of Records: 22 Johann E. DoG re~~ ARCO Alaska, inc. Is a Sub$1dlaW of AtlantlcRIchf~leldCompany MEMORANDU TO: State o aska Alaska Oil and Gas Conservation Commission David J o h.~:~s~ Chairma~ _~ 0.~ THRU: Blair Wondzel~~'(~. '"' FILE NO: P. I. Supervisor~a/o DATE: April 2, 199~ FROM: Lou Grimaldi, ~-~ ~-.~ ?'Y SUBJECT: Petroleum Inspector EFRJDBBD.doc Diverter Inspection Nabors 28-E Arco well # 13-31 Prudhoe Bay Field PTD #94-4O Saturday, April 2,1994: I traveled to Arco's drill site 13-31 in the Prudhoe Bay Field to witness the DiVerter function test on Nabors 28-E. When I arrived the crew was just finishing nippling up the Diverter line, this line terminated within fifty feet of the rig and at my request the snow that had blown in the end of the 16 "vent line was removed and a layer of visqueen was placed over the end. The annular preventer was a 20" Hydril type GK with a single 16" vent line. When functioned, the diverter completed it's cycle in 28 seconds which is a good time for this size assembly. The vent lines Knife valve was quick and simultaneous. I made a tour of the rig and found it to be in good shape. The rig was passed to drill surface hole at this point. Summary: I witnessed the Diverter function test on Nabors 28-E. Attachment:EFRJDBBD.XLS Drlg Contractor: Operator: Well Name: Location: Sec. ~'""'~ STATE OF ALASKA ~',,,~ ALASKA 0"' AND GAS CONSERVATION COMM,,,~ION Diverter Systems Inspection Report NABORS ARCO DS 13-31 14 T. 10N R. Date: Operation: Development XXX Exploratory: Rig No. 28E PTD # 94-40 Rig Ph. # Oper. Rep.: Georcde Ramse)/ Rig Rep.: Mike Downey 14E Merdian UMIAT 4/2/94 659-4863 TEST DATA MlSC, INSPECTIONS: Location Gen.' OK Housekeeping: OK Reserve Pit: NA Well Sign: OK (Gen.) Drlg. Rig: OK Flare Pit: NA DIVERTER SYSTEM INSPECTION: Diverter Size: Divert Valve(s) Full Opening: Valve(s) Auto & Simultaneous: Vent Line(s) Size: Vent Line(s) Length: Line(s) Bifumated: Line(s) Down Wind: Line(s) Anchored: Turns Targeted / Long Radius: 2O YES YES 16 7O NA YES YES NA in. in. ACCUMULATOR SYSTEM: Systems Pressure: Pressure After Closure: 200 psi Attained After Closure: Systems Pressure Attained: Nitrogen Bottles: 3000 psig 1800 psig min. 25 sec. min. 20 sec. 8EA.@ 2000 psig MUD SYSTEM INSPECTION: Trip Tank: Mud Pits: Flow Monitor: Light Alarm OK OK OK OK OK OK GAS DETECTORS: Methane Hydrogen Sulfide: Light Alarm OK OK OK OK DIVERTER SCHEMATIC ,, Wind Direction J Pit Skid I 16" ~ill opening I knife valve NORTH Non Compliance Items Remarks: 0 Repair Items Within 0 Day (s) And contact the Inspector @ 659-3607 Dislribulion orig. - Well File c- Oper/Rep c - Dalabase c F~'0gL:~j.le/'/93 c-Inspector AOGCC REP.: EBRJDBBD.XLS OPERATOR REP,: Louis R Grirnaldi ~7'-'"1 STATE OF ALASKA ~' ~ A~oKA OIL AND GAS CONSERVATION COMMIS,5.~jI APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. 3. Address Abandon Suspend ~ Operation Shutdown ~ Alter casing' ~ Repair well ~ Plugging ~ Change approved program X Pull tubing ~ Variance~ 5. Type of Well: Development , Exploratory Stratigraphic Service X P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1579'NSL, 1423' WEL, SEC. 14, TION, R14E At top of productive interval 5013' SNL, 3208' WEL, SEC. 15, TION, R14E At effective depth At total depth 5059' SNL, 3423' WEL, SEC. 15, TION, R14E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Re-enter suspended well~ Time extension Stimulate __ Perforate ~ Other ~ 6. Datum elevation (DF or KB) KBE , 80.1 7. Unit or Property name Prudhoe Bay Unit 8. Well number 13-31 9. Permit number 94-40 10. APl number 50- 029-22459 11. Field/Pool Prudhoe Bay Field~Oil Pool feet Plugs (measured) feet feet Junk (measured) feet feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured Length true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size Cemented Measured depth True vertical depth MAR ~ 1 1994 At~ska Ou & Gas Cons, Oommissio, Anchorage 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation 4/3/94 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Service WAG Injector Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sic~ned ~f'~~ TitleDrillin~En~lineerSupervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Original Signed By Approved by order of the Commission David W. J0hnst0n_, . Approve(] Copy Returned . Form 10-403 Rev 06/15/88 Commissioner Date~-.~ I.- (~ Iq I App ova No. ? O 2 Date c//~/,//~_ y SUBMIT IN TRIPLICATE DS 13-31 Sundry application Change in program In accordance with the attached letter regarding surface casing. It is proposed that this program include the 9-5/8" 40# L-80 surface casing to the same depth as approved in the permit. RECEIVED ~AR S 1 1994 A~ska u~ & Gas Cons. Commissio~ Anchorage BP EXPLORATION ARCO Alaska, Inc. To: Mr. David W. Johnson Chairman Alaska Oil & Gas Conservation Comm{ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Prudhoe Bay Unit 9-5/8" Surface Casing Design Date: March 31, 1994 Dear Commissioner Johnson; This letter follows a telephone conversation and verbal approval from Jack Hartz to proceed with 9-5/8" 401b/ft, L-80, BTC casing for surface casing in the Prudhoe Bay Unit. Prudhoe Bay Drilling has just completed the desigr~ and performance analysis for this application, and in ail cases the casing exceeded the mi~knum casing design safety factors for tension, burst, and collapse as outlined in the BPX Casing Design manual. Three different wellbore, geometry's and five load scenarios were checked, (attachments 1 through 3). The casing shoe setting depth was assumed to be 5000' TVD since this is the maximum setting depth per the PBU Field Rules. A hole angle of 0° 30° 60°was built at a 3°/100 build rates with a 6o100' dogleg at 2100' TVD were evaluated. The maximum anticipated surface pressure used was 3500 psi which corresponds to a maximum BHP of 4380 psi ~ 8800' SS assumirtg a 0.1 psi gas gradient to' surface. The basic load scenarios and ballooning, force formula were taken from the BPX Casing Design Manual. The bending force, biaxial burst, and triaxial burst formulas were taken from the ARCO Drilling Manual. The pipe body yield strength, internal yield pressure, and the collapse method and calculations were taken from APl Bul 5C3. Based upon a discussion between Greg Walz, ARCO SR. Drilllng Engineer and Blair Wonzell with the AOGCC, permafrost conditions will not be an issue for this pipe because it is L-80 casing. Past permafrost casing strain evaluations have shown the L-80 grade or less will be sufficient in the permafrost and qualification modeling will not be necessary. BaSed on our analysis we have found that performance safety factors are equal to or exceed 1.3 for all load scenarios tried. Therefore, Prudhoe Bay Drilling believes 9-5/8", 40#, L-80, BTC casing is acceptable for surface casing for use in the Prudhoe Bay Unit. T. W. Burton Drilling Engineer Attachments cc: Sam Lynch Adrian Clark Terry Jordan Kirk White Mike Zanghi RECEIVED ~AR ~ 1 1994 Alaska Oil & Gas Cons. Commissior' Anchorage BU Surface casing D;sign Sc~rios Attachment I 3/31/94 8:52 AM Casing: 9-5/8", 40#, L-80, BTC Wellbore Geometries Wellbore #1 Wellbore #1 Wellbore #1 Wellbore #1 Wellbore #1 Shoe TVD 5,000' 5,000' 5,000' 5,000' 5,000' KOP n/a n/a n/a n/a n/a Build Rate 0°/100' 0°/100' 0°/100' 0°/100' 0°/100' Max Hole Angle 0~ 0~ 0~ 0= 0= Max Dogleg @ 2100' TVD (deg/100') 0°/100. 0~/100' 0°/100, 0°/100' 0°/100' Load Variables Running Casing Cementing Casing Pressure Test 70 bbl Gas Kick Lost Circulation (Tension) (Tension, Burst, Collapse) (Tension & Burst) (Tension & Burst) (Tension & Collapse) Casing Setting Mud Weight 0.0 9.5 9.5 9.5 9.5 Internal Fluid Weight #1 (ppg) 0.0 9.5 9.5 0.0 0.0 Internal Fluid Weight #2 (ppg) 0.0 9.5 9.5 11.0 0.0 External Fluid Weight #1 (ppg) 0.0 12.0 8.7 8.7 9.5 External Fluid Weight #2 (ppg) 0.0 15.8 8.7 8.7 9.5 Plug Bump Pressure (psi) 0 3,500 ' 0 0 0 Plug Bump Internal Fluid Weight (ppg) 0.0 9.5 0.0 0.0 0.0 Additional / Balloon Pressure (psi) 0 0 3,500 3,500 0 Casing .Overpull (lbs)' 100,000 100,000 100,000 100,000 100,000 . Safety Factors Tension Top 3.1 1.9 1.9 1.9 3.4 Tension Bottom 10 + 4.9 1 0 + 1 0 + 10 + Burst Top (Biaxial/Triaxial) N/A 1.8 / 1.8 1.8 / 1.8 1.8 / 1.8 N/A Burst Bottom (Biaxial /Triaxial) N/A 3.0 / 3.1 1.5 / 1.5 1.7 I 1.8 N/A Collapse Top N / A 10 + N / A N / A 1 0 + Collapse Bottom N/A 1.9 N/A N/A 1.3 RECEIVED ~AR $1 199~ A.t~$ka~ Uti & Gas Cons. Commission Anchorage clU Surface Casing Design Sc~-'~rios Casing: 9-5/8", 40#, L-80, BTC Attachment ~ 3/31/94 8:52 AM Wellbore Geometries Wellbore #2 Wellbore #2 Wellbore #2 Wellbore ~ Wellbore #2 Shoe TVD 5,000' 5,000' 5,000' 5,000' 5,000' KOP 1,500' 1,500' 1,500' 1,500' 1,500' Build Rate 3°/100' '30/100' 30/100' 30/100' 3~/100' Max Hole Angle 30° 30o 30o 30Q 30o Max Dogleg @ 2100' TVD (deg/lO0') 6~/100' 6o/100' 6Q/100' 6a/100' 6"/100' Load Variables Running Casing Cementing Casing Pressure Test 70 bbl Gas Kick Lost Circulation (Tension) (Tension, Bursl, Collapse) (Tension & Burst) (Tension & Burst) (Tension & Collapse) Casing Setting Mud Weight 0.0 9.5 9,5 9,5 9,5 Internal Fluid Weight #1 (ppg) 0.0 9.5 9.5 0.0 0.0 Internal Fluid Weight #2 (ppg) 0.0 9.5 9.5 11.0 0.0 External Fluid Weight #1 (ppg) 0.0 12.0 8.7 8,7 9,5 External Fluid Weight #2 (ppg) 0.0 15.8 8.7 8,7 9.5 Plug Bump Pressure (psi) 0 3,500 0 0 0 Plug Bump Internal Fluid Weight (ppg) 0.0 9.5 0,0 0.0 0,0 Additional / Balloon Pressure (psi) 0 0 3,500 3,500 0 Casing Overpull (lbs) 100,000 100,000 100,000 100,000 . 100,000 Safety Factors Tension Top 2.9 1.8 1.8 1.8 3.2 Tension Bottom 10+ 4.9 1 0+ 10+ 10+ Burst Top (Biaxial/Triaxial) N/A 1.8 / 1.8 1.8 / 1.8 1.8 / 1.8 N/A Burst Bottom (Biaxial/Triaxial) N/A 3.0 / 3.1 1.5 / 1.5 1.7 / 1.8 N/A Collapse Top N/A 1 0+ N/A NIA 10+ Collapse Bottom N/A 1.9 N/A N/A 1.3 REC£1V£D MAR 5'l 1994 0il & Gas Cons. Commission Anchorage -~U Surface Casing Design Sc( i ios Attachment 3~ 3/31/94 8:52 AM Casing: 9-5/8", 40#, L-80, BTC Wellbore Geometries Wellbore #3 Wellbore #3 Wellbore #3 Wellbore #3 Wellbore #3 Shoe TVD 5,000' 5,000' 5,000' 5,000' 5,000' KOP 500' 500' 500' 500' 500' Build Rate 3a/100' 3°/100' 3°/100. 3°/100. 3°/100' Max Hole Angle 600 600 600 600 600 Max Dogleg @ 2100' TVD (deg/100') 6°/100, 6°/100. 6°/100' 6°/100. 6~/100' Load Variables Running Casing Cementing Casing Pressure Test 70 bbl Gas Kick Lost Circulation (Tension) (Tension, Burst, Collapse) (Tension & Burst) (Tension & Burst) (Tension & Collapse) Casing Setting Mud Weight 0.0 9.5 9.5 9.5 9.5 Internal Fluid Weight #1 (ppg) 0.0 9.5 9.5 0.0 0.0 Internal Fluid Weight #2 (ppg) 0.0 9.5 9.5 11.0 0.0 External Fluid Weight #1 (ppg) 0.0 12.0 8.7 8.7 9.5 External Fluid Weight ~2 (ppg) 0.0 15.8 8.7 8.7 9.5 Plug Bump Pressure (psi) 0 3,500 0 0 0 Plug Bump Internal Fluid Weight (ppg) 0.0 9.5 0.0 0.0 0.0 Additional/Balloon Pressure (psi) 0 0 3,500 3,500 0 Casing Overpull (lbs) 100,000 100,000 100,000 100,000 100,000 .. Safety Factors Tension Top 2.6 1.7 1.7 1.8 2.8 Tension Bottom 10+ 4.9 1 0+ 1 0+ 1 0+ Burst Top (Biaxial/Triaxial) N/A 1.9 / 1.9 1.8 / 1.8 1.8 / 1.8 N/A Burst Bottom (Biaxial/Triaxial) N/A 3.0 / 3.1 1.5 I 1.5 1.7 / 1.8 N/A Collapse Top N/A 1 0+ N/A N/A 10+ Collapse Bottom N/A 1.9 N / A N / A 1.3 M/XR 5 1 1994 Gas Cons, Commissior', Anchorage CONSERVATION COMMISSION ALASKA OIL AND GAS 3~ PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 March 18, 1994 Terry Jordan Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit DS 13-31 ARCO Alaska, Inc. Permit No. 94-40 Sur. Loc 1579'NSL, 1423'WEL, Sec. 14, T10N, R14E, UM Btmhole Loc. 5059'SNL, 3423'WEL, Sec. 15, T10N, R14E Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Commis s ioner , BY ORDER OF THE COMMISSION dlf/Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~.t~ pri,,ted on recycled pape, b y C [17. ,/'~,~ STATE OF ALASKA ,' ' ALASKA'L,,.,L AND GAS CONSERVATION cO,,,~MISSlON PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill 171 RedrillCIIlb. Type of Well. Exploratoryl-I Stratigraphic Test I-I Development Oill-I Re-Entry [] DeepenF'II · Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool .ARCO Alaska, Inc. KBE = 80.1 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property DesignatiOn Bay Pool P. 0. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28314 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1579' NSI., 1423' WEL, SEC. 14, TION, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 5013'SNL, 3208' WEL, SEC. 15, TION, R14E 13-31 U-630610 At total depth 9. Approximate spud dat® Amount 5059°SNL, 3423' WEL, SEC. 15, TION, R14E 4/3/94 $200,000.00 12. Distance to n~arest' 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 28315-3423 feet No close approach feet 2560 12235' MD/9131' 7'VD feet !16. 'To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth soo feet Maximum hole an~ie4z. 4s o Maximum surface 3330 ~'sig At total depth (TVD) ~'00'//4390 psl~l 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 32' 32' 112' 112' 260 sx Arcticset (Approx.) 12-1/4" 9-5/8" 4 7# L-80 NSCC 3524' 31' 31' 3555' 3265' a7o sx CS 111/375 sx "G"/250 sx. CS II 8,1/2" 5-1/2" 17# L80/N80 BTC/LTC 12204' 30, 30' 12234' 9131' 573 sx Class "G" !1'9. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) 'true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate MJ~F~ 1 5 1994 Production Liner Ai~Sk~ 0ii & Gas Cons. Commission PerforatiOn depth: measured Anchorage true vertical 20. Attachments Filing fee [[] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drillinc,] fluid program [] Time vs depth plot [] Refraction analysis I-! Seabed report[] 20 AAC 25.050 requirementsr-I 21 I herebY certify that the foregoing is true and correct to the best of my knowledge Signed ~)[ ~ Title Drillin£ En~lineerSupervisor Date J~ ' Commission Use Only Permi.~ Number '"" JAPI number JApp_roval date~.. ISee cover letter .. ..~'..~/'- cZ,'~ 150. c~ z.-f'- 2_ ~ G,'~<~ I ~ - / o° 'g ~/s Ifor other requirements uon61itions of approval Samples required [] Yes ~ No Mud log required 6 Y '[~ No Hydrogen sulfide measures [] Yes J~3 No Directional survey requ~rea ~ Yes I-I No Required working pressure for BOPE 1-12M; l'-13M; ,~5M; []10M; F'115M; Other: by order of Approved by UR~fJ~AL SIGNED BY' Commissioner tne commission Date :~//'/~//.5"/¥ :'orm 10-401 Rev. 1 Submit ir plicate I Well Name: IDS13-31i [ Well Plan Summary I Type of Well (producer or injector): ] WAG INJECTOR ] Surface Location: 1579' FSL 1423' FEL S14 T10N R14E UM Target Location: 5013 FNL 3208'FEL S15 T10N R14E UM Bottom Hole Location: 5059 FNL 3423'FELS15 T10N R14E UM I AFE Number: 14J0254 ] I Estimated Start Date: [ 4/3/94 ] IMD: ! 12,235' I ITVD: ["Well Design (conventional, slimhole, etc.): I Rig: I Nabors 28E OPerating days to complete: I 15 9131' I i I 80,1 [ Ultra-Slimhole LOngstring Formation Markers: Formation Tops TVD (brt) MD (brt) ' ' ' K-12 6470 8297 K- 10 6998 9078 K-5 8i03 10713 LCU/SAG RIVER 8836 11797 SHUBLIK 8857 11829 TSAD 8930 11937 OOWC 9030 12085 Top HOT 9035 12092 Zone 4A/X-Ray 9056 12123 " ' 'iD ' 9131 12235 " ' Casing/Tubing t'rogram: Wt/Ft Hole Size Csg/ - WtTFt Grade Conn Length Top Btm Tb, g O.D. MD/TVD MD/TVD 30" 20" 91.5// H-40 Weld 80 32/32 112/112 12-1/4/' ,9-5/8" , 47// L-80 NSCC 3524 31/31 3555~265 ,,, 8.5" 5-1/2" 17# , L80/i~180 BTC/LTC 12204 30/30 12234/9131 N/A 3-1/2" Coil 0.203" LC0 Equiv N/A (+/-) 7071 29/29 (+/-) 8000/6393 Tubing Well Plan Summary RECEIVED MAR I 5 1994 Alaska 0il & Gas Cons. Commission ~ Anchoring. Page 1 Logging Pro [Open H°ie LOgs: [ Cased Hole Logs: ram: GR/BHCS/DIL from TD to 200' above TSAD CBL from TD to 500' above the TSAD Mud Program: [ Specifil design considerations ]None. Surface Mud Properties: Density Marsh Yield 10 see 10 min pH Fluid , (PPG) Viscosity Point, gel gel Loss 8.5 200 30 30 40 9 15 tO tO tO tO I tO tO tO 9.2 300 60 60 80 10 25 , Intermediate Mud Properties: [ Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss N/A N/A , N/A , ,, Production Mud Properties: [ Density Marsh Yield 10 sec · 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 25 8 3 7 8 4 to to to to to to to · 9.8 50 13 10 15 10 10 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annRlay_p_re_ve~nter will be installed and is capable of handling maximum potential surface pressures. [~ C ~ [ ~/~ D · DiVerter, BOPE and drilling fluid system schematics on file with AOGCC. ~;,~/~.,F~ ~ ~. i994 Directional: I KOP: ! 800'@ 1.0 de~100' Maximum HOle Angle: } 47.48 DEG 'CloSe APproach Well: [No close-approach wells. The above listed wells will be Secured during the close approach. Well Plan Summary Page 2 , . , . . o , . 10. 11. 12. Notes: a. bo C. Operations Summary DS 13-31i MIRU drilling rig. N/U diverter and function test same. Drill 12-1/4" hole to surface casing point. Run and cement 9-5/8" surface casing. Nipple up BOPE and function test same to 5000/250 PSI. PU 8.5" BHA and RIH. Test casing to 3000 psi for 30 minutes. Drill 10' new hole and perform leak-off test. Drill 8.5" hole to TD. Wiper trip, log with GR/BHCS/DIL from 200' above TSAD to the base of Zone 4. Run and cement 5-1/2" production casing-- Bump plug with filtered Seawater. Test casing to 3500 psi for 30 minutes. Back out Landing Joint, Run & test packoff to 5000 psig. RIH w/2-7/8 .... DP to 2000' and Displace filtered sea water w/diesel for freeze protection. POOH L/D 2-7/8"" drill pipe. Freeze protect top 2000' of 5-1/2" x 9-'5/8" annunlus with 60/40 methanol water mixture. ND BOP's, NU tree and test same. Release rig. MIRU wireline unit run cement bond log to 500' above TSAD. wireline unit. MIRU Coil Tubing Unit and perform coil tubing completion. Anticipated BHP: Maximum Anticipated BHP: Surface Pressure: Planned Completion FlUid: RDMO 3650 psi @ 8800 sstvd 3750 psi @ 8800 sstvd 2870 psi 8.6 ppg Sea Water The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). Based on previous logs at Drill Site 13, no potential productive zones are anticipated above 8819' TVD (TSAD). ;.!:, t~.:~~ ~;,,(?i\'i:, ti't);''''''''~''-''~'''~'' DS13-31i CEMENT PLAN - BJ Casing Size: Circ. Temp.: Spacer: Lead Cement: Tail Cement : 9-5/8" SURFACE CASING 9- 5/8', 47# 38°F 50 bbls fresh water ahead of lead slurry Coldset III Additives: Retarder Weight: 12.2 ppg Yield: 1.92 cuft/sx Class G Additives: Weight: Yield: Volume (sacks): 870 Mix Water: 10.5 gps Thickening Time: > 4 hrs @ 50°F Volume (sacks): 375 2% A-7, FP-6L lghs 15.8 ppg Mix Water: 5.0 gps 1.15 cuft/sx Thickening Time: >3-1/2 hrs @ 50°F Top Job: Coldset II Additive: Weight: Yield: Cement Volume Summary: (1) Lead slurry to surface w/100% excess Retarder 15.6 ppg 0.95 cuft/sx Volume (sacks): 250 Mix. Water: 3.7 gps Thickening Time: >2 hrs @ 50°F (2) Tail slurry volume: 375 sx, (to cover at least 500' of casing shoe w/100% excess + 80' shoe vol.). (31. Top job volume 250 sx (fixed volume) 5-1/2 .... LONGSTRINGCASING Casing Size: Circ. Temp.: Spacer: 5o 1/2", 17# 1400F 70 bbls of MCSo4 Spacer weighted 1 ppg above current mud weight Lead Cement: . Tail Cement: class G Additives: Weight':" Yield: Fluid Loss: Class G Additives: Weight: Yield: Fluid Loss: Volume (sacks): 354 A-2: 3%, 'FL-52: 0.4%, CD-32: 0.5%, FP-6L: l ghs 11.0 ppg Mix Water: 20.92 gps 3.31. cuft/sx Thickening Time: >5hrs@ 140°F 150-250 cc Free Water: 0.0 cc £CEIVED volume (sacks): 2~9 ~IA~'~ 7 ~ lo. 94 A-2: 0.1%, FL-52: 0.3%, CD-32: 0.5°/°, FP-6L: lghb~.?~!-~ O:/i ~ (,~.~ 15.8 ppg Mix Water: 4.85 gps A~e~',C~ ......' 1.14 cufFsx Thickening ~me: 3.5 - 4.5 hfs ~ 140°F .... ~;~ 100-150 cc Free Water: 0.0 CC Cement Volume Summary: (1) Lead Slurry to 500' MD above top of production packer at 8000' MD BRT with 30% excess (2) Tail Slurry to 500' MD above Top of Sadlerochit (top of SAD @ 11'937 MD) with 30% excess plus 80' of 5-1/2", 17# capacity for float joints TWB, 3/12/94 ~'*"' '9'4 16'5~ No 016 P 02 15" I. DATE OF SURVEY: MARCH OB, 1994. 2. REFERENCE FIE..{ g PB 94-08 PR.~. .1. ALASKA S'IA}E PLAN~ ODOI~DINA'ILS ARE ZONE 4. ALASKA, NAD 4. PA0 BCAt.~ FAC1OR IS ~, ~, ~ AND ~? A~.-BU~L1 (~, AS'-ST^KE WELLS 'm EXI~IlNG ~T,L.I $ L0,qATEp W, THIN PROIRACTED SEC. 14, T. '~0 N., R, 14 F.~ U.M.u AK. ~'j-J A..K.~ J PLAN) J N'~. / COORDIN^TES ]COOF(O,NATCS ?,,i×~~: ~,";~,~-"~,:'~ I-~~~-- 685,1:hB.62 J W, 285.11 148'30'g3,428"j N/A i~t,,' 1¥' ~,6':~f,m~o. e4 I s. looo, s2 70'13'0.5.277"1 ,' ....r'I~'"~'~T'I:'~'L--J L-f.." Ix,- ¢n:,,nr,,s.,o 1....w_...2~.4.._(.4.... !4.~F_,Lo'o~.~sz') "/^ I.).~by...r.L!. ORIGINAL AS-STAKE ISS'U[ _VICINITY MAP N, T,,C..,, RECEIVED DATE MAR 7 4 1994 AJaska Oil & fias Cor~s. Commission Anchorage o4rA'':'~g~'A;; ----- i F, R. BELL 84 ASSOCIATES ARCO Alaska Inc. DRILL SITE 13 WELLS 31 & 55 AS-STAKED CONDUCTORS I _ I ,.t/r~/¢~4 I RARN~AR~ /f LNllL J j j~, r, tr~,,- ....... ~ r'-.T ~ t- _~ 1"=500' I l DRAWN CHECK D$13AB IF,. ..... j._c~ ',/ J__ / Prudhoe Prudhoe Drill Site Well' DS Well Bay Dritlino Bay Unit, Alaska 13 Plan 'DS 13-31i WP2 HALLIBURTON DRILLING SYST£NS HORIZOI~"rAL VIE'~: (TRUE NORTH) SCAi,E 1000 ft. /, DlVlSION TV0 9OOO 7000 6000 5000 4000 3000 ZOO0 1000 ~1500 WERTICAL VIEW SCALE 500 ft. ~ DMSION T~ REF; RKB VERTICAL SECTION REF: ~.~0' ~ . 0 O.OG' ~ 800 MD .00' 900 Mg ,00' ~ 1000 ND 3,00' ~Il00 400'~1~00 ND START 5.50' E1300 ~D 7.~?E1400 ~ 63 l~,DO* E1700 22.00° ,00' ~ 8400 CRITICAL POINT DATA MD Inc Az). TVD N/S TIE IN O O,DD' O.DD' O 0 N D KDP / START 800 O.DO' O,OO* 800 0 N 0 DF BUILD ~ i.DO*/lOD ~ START DF BUILD 1200 4.00' 260.00' 1200 ~ S 14 ~ 1.50'7100 Ft START DF 1600 lO.OD' ~GO.DO* 1597 11S 6~ CURVE ~ ~.OO'/lOO F~ END DF CURVE 3474 47.48' 259.46' 3~I0 171 Ves~ S~k 7877 47.48' ~59,46' 6!86 ~65 S 41~ K-i~ 8~97 47.48' 259.~6' 6470 B21 K-la 9078 47.48' ~59,46' 6998 9~6 K-5 10713 47,48' 259.46' 8103 1147 B~SE HRZ 10808 47.48' ~59.46' 8167 1160 S 6~46 DGDC 11530 47.48' 259.46' 8655 I~57 SAG RIVER 11798 47.48' 259.46' 8836 1~93 SHUBLIK 118~9 47.48' ~59.46° 8857 1~97 t=rget i / 11937 47.48' 259.46' 8930 1312 S 7064 TOP SAD OOVC / POVC 12085 47.48' 259.46' 9030 133~ S 7171 HOT 1~0~ 47.48' 259,46' 9035 1333 X-RAY 12!~3 47,48' 259,46' 9056 1337 3Pi0 -- 85C0 -- 2600 E 280° ND toroet 1 8930 1312 S 7064 V 678773 5930129 ' ............ ~B~ - .~47,48' E 11530 MD OOOC /~ 4 e llTq lV~R 7~s-- - -- ~ ~47,48' ~ 1~35 MD I i I -500 0 500 1000 1500 VERTICAL SECTION PLANE: ~59.48 ~000 8500 3000 3500 400~ 4500 5000 5500 $000 6500 7000 7500 BO00 PROPOSED BHL TVD 9131.4f] MD 12234.55 VS 74 04.52 N/S 135~.89 S E/W 7280.06 W Date Plotted Checked Approved Date IAI_ L_ IBUR 1'[~ 3/10/94 IOlB an HI3RIZONTAL VIEW (TRUE NORTH) SCALE 500 rt. / DIVISION SURVEY REF: WELLHEAD 134 0o Upa I I I I 7.500 7000 6500 6030 I31,5 I 45OO 500 TroveLling CyLinder - Normal PLane Re?erence ~,lelL- 13-311 Wp~ MD'. 0 - 10344 ft, Intervo[, 50 Ct, AIL Direc%ions Re[ ~o True North 330° 0o 6OO 550 300 HALLiBLJRTgN 3/10/94 9:28 300° ~50 400 350 3O0 250 200 60° ~70° 90° : 20° 151D~ ~ 50.00 5D.~ 14~.46 ~g7 ~.~ ~ ~'..~ 1 ~.~ 47.~ O~ 0.~ 1 ~.78 ~3.~ 17~.~ ~.~ ~.~ l &~.~ '. 5-~.5167.~ ~.~4 167.12 ~.~ B~ 52 167.~ O,~ O.~ i 150° ? ..... Nome TVD Grid X 5ei~ v 'J target 1 8930 678773 5933129 } CRITICAL PDiNT DATA ND ]nc Azl. TVD TIE IN 0 0.00° 0.07 9 C N O KiP / STPRT 800 0.00° O.OO [iF BJILD e i.OOo/iO0 START OF ~JILD 1200 4.0g° ~.60.00° !L>OO 2 S !4 ~ 1.50o/!00 {'1; ST~T D- 1~ I0.~ ~,0~ I~7 11 S ~ 2,~/I~ Fm KND ~ C~VE 3474 47.4~ Vesl ~k 7877 47.4~ 2~.46° 6185 765 ~ 4122 K-12 B~7 47.48° 2~.46° 6470 8~1 S 4427 K-lO 9378 47.48~ ~,46° 6~8 K-5 ~07~3 47.48° ~.46 ~SE ~Z 10838 47.48o ~ 1~5~ 47.4~ ~.46 SAG R!~R 11798 47.48* ~.46~ 8836 1~3 S 6~3 ~BL~ 118~ 47.48° ~.46° 8~37 I~7 S 6~ · ~_1 / 1~g37 47.48° ~.46 ~ / ~C 1~5 47.48° ~.46° 90~ 133~ S 7171 ~T ~ 47.48° ~.46° ~35 1333 S 7177 X-RAY IRIS3 47.4~ PP~SED ]~ ~3~.48 VS 7404.5~ N/S 1351.89 S E/W 7280.06W I)axe PLot"ced Cr'ecite~ By Checked By App~ovec~ By D~"ce Pm. olhoe Bey Dm iLLin9 ' ' -Pruolhoe Bey Uni%, ALeske Well: DS Well Plen :DS WP8 T~o, veLlin9 CyLinde~ - Normc~L PLane ReCerence g/ell - 13-311 Wp8 HD: 0 - 10344 Ct, Interval, 50 ALL Dir ection s Rel to True Nor th 330° 0o · I 600 550 HALLIBURTON' ~ SYSTEMS 3/10/94 30° 300° 45O 400 350 3O0 ~50 2O0 60° 270° 90° 840o 120° 210° 150° 13-01 130~ 13-0~ 130~ t ~303 13~ 13-07 1~ 13-~ 1310 13-t0 1311 13-ll 1312 13-12 1313 13-13 1314 13-14 1315 13-15 1316 13-16 1318 13-18 1319 13-~g 1~ 13-~ l~l 13-~1 ~ 13-~ 1~3 13-~ 1~ 13-~ 1 ~4 13-~4 t~ 13-~ 1~ 13-~ 1~7 13-27 13-~ ]~s~nceI)i~ec't;on Ref ND Re/' TVD 1510.~ ,.~ ~,~ ~.~ 4~.~ 14~.~ ', ~.~ ~.~ ~9.~ 14~.~ ~Ol ~.~ ~.~ 14~,~ 1~,~ 87.~ ~,~ ~.~ 1449.40 1~.07 91 .~ ~ ~,~ 14~.~ ~.~ 1~.~ 0.~ 0.~ 17~.~ ~.~ 151.~ 0.~ 0.~ ~.~ ~1.~ 148.~ 0.~ 0,~ ~3.~ 4~.~ 143.~ 0.~ 0.~ ~.~ ~.~ ~.40 t6~.~ I~5.67~.~ ~0~9.~ ~7.~ 4~.~ 4~,~ 3~4.~ 1~.~ 47.~ 0.~ 0.~ ~191 .~ 1 ~0.6 t~.~ ~ ~.~ ~0.~ 1612.~ ~.49 ~.~ ~.~ 272.~ 1~,78 ~.~ 17~,~ 1743.~ ~.~ ~.~ ~.~ 1~,~ ~.51 ~1.43 ~.~ 17~,~ 16~.67 41.70 ~.6g ~1.61 1~.~ I 1~,~ ~.~ ~.~ 167.1~ ~.~ ~.~ ~5.~ 4~,36 ~7.~ 0.~ 0.~ ~.~ ~,13 1~.~ ~.~ 8.~ 169.74 ~,24 1 ~.~ 1 ~9.0718.~ ~.~ ~.7~ 1~.~ 14~.~ 61.70 1791.07 ~.~ ~.~ ~.~ 17~.~ ~.~ 1~.~ 0.~ 0.~ ~.~ RECEIVED /WAR 74 1994 Alaska Oil & Gas Cons. Commission :Anchorage 180° ITap,qet Nome TVD G~id X Grad Y ge-t; 1 8930 678773 5930129 CRITICAL PDINT DATA ND Inc Azi. TVD N/S E/~/ TIE IN 0 0.00° 0.00° 0 0 N 0 KEP / START 800 0.00° 0.00° 800 0 N 0 DF BUILD ~ 1,00°/100 Pt START OF BUILD1L:q]O 4.00° 26(100° 12(]0 2 S 14 ~ 1,50°/100 START OF 1600 lO,OD° 260,0D° 1597 11 S 62. CURVE ~ 2,0D°/IOD END OF CURVE 3474 47,48° 259,46° 3210 171 S 932. West S~k 7877 47.48° ;359,46°6186 765 S 4122 K-12 8E:~)7 47,48° 259,46° 6470 821 S 4427 K-lO 9078 47,48° L:~o9,46o 6998 926 S 4993 K-5 10713 47,48° 259,46° 8103 1147 S6178 BASE PRZ 10808 47,48° 259,46° 8167 1160 S6~46 ~ 11530 47,48° 259,46° 8655 1257 S6769 SAG RIVER 11798 47,48° E~og,46°8836 1293 S6963 SHUBLIK 118~9 47,48° 259,46° 8857 lpg7 S6986 t~g_e_~_l / 11937 47,48° L::~¢:2,46° 8930 1312 S7064 FrlWC / ~ 12085 47,48° 259,46° 9030 133E S7171 FI3T 12092 47.48° 259,46° 9035 1333 S7177 X-RAY 12123 47,480 259,46° 9056 1337 S7:199 I PROPOSED BHL TVD 9131.48 MD 12234.55 VS 7404,5~ N/S 1351.89 E/~ 7280.06 D~te Pto~ed Cce~ed By Checked By Apppoved 3y D~e ¢j4] WELL PERMIT CHECKLIST COYmANY /W/~ INIT CLASS UNIT# PROGRAM: exp [] der [] redrll [] serv ~ ON/OFF O ADMINISTRATION APPR DATE 1. Permit fee attached .................. i~/~-~5 ) N 2. Lease number appropriate ............... N 3, Unique well name and number .............. ~. N 4 Well located in a defined pool ............. .~. ~ N 5. Well located proper distance from drlg unit boundary. '~I N 6 Well located proper distance from other wells ..... ~.' N 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ ~ N 9. Operator only affected party .............. ~ N 10. Operator has appropriate bond in force ......... ~ N 11. Permit can be issued without conservation order .... ~ N 12. Permit can be issued without administrative approval..~ N 13. Can permit be approved before 15-day wait ....... ~ N ENGINEERING APPR DATE GEOLOGY 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg..~ N 17. CMT vol adequate to tie-in surf csg to next string .... Y ~ 18. CMTwill cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved, rY~ 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate .......... ~ N 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate .................... '~ N 26. BOPE press rating adequate~ test to ~-~(~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N 30. 31. 32. 33. APPR D, 34. Permit can be issued w/o hydrogen sulfide measures .... Y .,~ Data presented on potentiam overpressure zones ..... Y /--~ ) Seismic analysis of shallow gas zones .......... Y/ N ~[,w'~ Seabed condition survey (if off-shore) ......... ~ N Con~act name/phone for weekly progress reports .... ~ Y N [explorator~ only] ~ GEOLOGY: ENGINEERING: COMMISSION: DWJ Coa~ents/Instructions: Z Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. Tape Subfile 2 is *type~ LIS TAPE HEADER PRUDHOE BaY I/NIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 8 6700.00 GABEL/FRENCH J. CARLILE D.S. 13-31 500292245900 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 24-JUN-96 14 10N 14E 1579 1423 80.10 78.60 45.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 8.500 REMARKS: 9.625 3525.0 12150.0 MWD - EWR4/GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. MWD RUNS 1 - 7 WERE DIRECTIONAL ONLY. MWD RUN 8 WAS DIRECTIONAL, DUAL GAMMA RAY (DGR), & ELECTROMAGNETIC 4-PHASE RESISTIVITY (EWR4). ._ RECEIVED ,JUN 2 8 1996 Alaska Oil & Gas Cons, Commission Anchorage FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 11772.0 RP 11788.0 $ BASELINE CURVE FOR SHIFTS: UNKNOWN CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 11772.5 11770.0 11810.5 11808.0 11815.0 11813.5 11830.5 11828.5 11836.0 11834.0 11857.5 11855.0 11865.5 11865.5 11869.5 11869.5 11878.0 11878.0 11891.0 11891.0 11892.5 11893.0 11900.0 11900.0 11907.0 11908.0 11910.0 11910.5 11912.5 11913.5 11916.5 11917.0 11924 . 0 11924 . 5 11931.5 11931.5 11935.5 11936.0 11937.5 11937.5 11948.5 11949.0 11960.0 11961.0 11965.5 11965.5 12150 . 0 12150 . 0 $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: all bit runs merged. STOP DEPTH 12104.0 12114.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 8 11814.0 12150.0 EDITED PASS. ALL MWD CURVES WERE SHIFTED WITH GR. /? ?SHIFT. OUT $ CN : ARCO ALASKA, WN : D.S. 13-31 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA INC. * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 810 01 1 4 90 180 01 1 28 * DATA RECORD (TYPE# 0 ) 998 BYTES * Total Data Records: 25 Tape File Start Depth = 12150.000000 Tape File End Depth = 11770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6089 datums Tape Subfile: 2 128 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11770.0 EWR4 11775.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIM UMANGLE: MAXIM UMANGLE: STOP DEPTH 12104.0 12114.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 15-APR-94 MWD 1.98 3.93 MEMORY 12150.0 11814.0 12150.0 0 .0 .0 TOOL NUMBER P0251CGR6 P0251CGR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): 8.500 3525.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 9.60 46.0 9.3 500 5.0 1.900 .850 1.500 2.900 78.0 183.0 78.0 78.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 8. $ : ARCO ALASKA, INC. : D.S. 13-31 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 810 01 1 4 90 180 01 1 28 * DATA RECORD (TYPE# 0 ) 998 BYTES * Total Data Records: 25 Tape File Start Depth = 12150.000000 Tape File End Depth = 11770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6089 datums Tape Subfile: 3 90 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 4 is type: LIS 96/ 6/25 01 **** REEL TRAILER **** 96/ 6/25 01 Tape Subfile: 4 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes End of execution: Tue 25 JUN 96 2:15p Elapsed execution time = 0.71 seconds. SYSTEM RETURN CODE = 0