Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout215-1341. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 24,986 NA Casing Collapse Conductor NA Surface 2,260psi Intermediate 3,090psi Slotted Liner NA Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng NIKAITCHUQ SLXP Liner Hanger Packer, 9 oil swell packers, and NA 16,221' MD/3,591' TVD, see schematic for swell packers, and NA NA 24,615' Slotted Liner 907-777-8438 keith.lopez@hilcorp.com Operations Manager December 15, 2024 4-1/2" Perforation Depth MD (ft): Slotted Liner 160' 20" 13-3/8" 9-5/8" 2,788' 5-1/2"8,253' 16,552' 5,020psi 5,750psi 2,452' 3,615' 3,568' 2,788' 16,552' 160' 160' 12.25# / L-80 TVD Burst 14,106' MD NA NA Hilcorp Alaska, LLC Length Size Proposed Pools: 3,552 24,615 3,568 1,040 SCHRADER BLUFF OIL SCHRADER BLUFF OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0388572, ADL0388574, ADL0388575, ADL0388583, ADL0391283 215-134 C.O. 639 NIKAITCHUQ SP28-NW3 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-629-23556-00-00 PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Keith Lopez Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 4:19 pm, Nov 22, 2024 Digitally signed by Sara Hannegan (2519) DN: cn=Sara Hannegan (2519) Date: 2024.11.22 16:12:59 - 09'00' Sara Hannegan (2519) 324-668 MGR26NOV24 DSR-12/20/24A.Dewhurst 26NOV24 * BOPE test to 3500 psi. Annular to 2500 psi. 10-404 MEUIRUMOF Gregory C. Wilson Digitally signed by Gregory C. Wilson Date: 2024.12.23 13:53:40 -09'00'12/23/24 RBDMS JSB 122424 Well: SP-28 PTD: 215-134 API: 50-629-23556-00-00 Well Name:SP-28 API Number:50-629-23556-00-00 Current Status:Producer Rig:Doyon 15 Estimated Start Date:12/25/2024 Estimated Duration:9 days Regulatory Contact:Darci Horner Permit to Drill Number:215-134 First Call Engineer:Keith Lopez (907) 777-8438 (O) (907) 903-5432 (M) Second Call Engineer:Sara Hannegan (907) 564-4624 (O) (907) 309-1196 (M) Current Bottom Hole Pressure: 1,400 psi @ 3,598’ TVD |7.5 PPGE Max Potential Surface Pressure: 1,040 psi Gas Column Gradient (0.1 psi/ft) Max Angle: 88° Sail Angle from 3,945’ MD to ESP setting depth of 14,100’ MD Brief Well Summary: SP28 was drilled and completed in August 2015 as a Schrader Bluff OA producer with an ESP completion. The current ESP ran for 3.5 years before grounding out on 9/20/2024. Objectives: Pull ESP completion, run VAC tool to remove sand from ESP setting depth and 1,800’ into liner top, run new ESP completion. Pre-Rig Procedure (Non Sundried Work) Operations: 1. Bleed off gas cap from IA before the rig move to the well Brief RWO Procedure (Begin Sundried Work) 1. MIRU Doyon 15 WO Rig, ancillary equipment, and lines. 2. Displace corrosion inhibitor from capillary line prior to pulling ESP. 3. Kill well by bullheading the tubing string and the IA. a. Pump 130% tubing volume (273 bbls) of injection water inhibited with biocide. b. Pump 130% annulus volume (1,185 bbls) of injection water inhibited with biocide. c. Monitor OA annulus during kill. 4. Flow check for 30 min to ensure the well is killed. 5. Install BPV inside tubing hanger as per Vault. 6. Nipple down X-mas tree. 7. Make up blanking plug on top of tubing hanger as per Vault procedure. 8. Nipple up BOP. 9. Run 4-1/2”, and 2-7/8” test joint and engage tubing hanger blanking plug. a. Perform full BOP pressure test to 250/3,500 psi (notify AOGCC 48 hours prior to BOP test). Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 10. Pull 4-1/2” test joint with blanking plug. 11. Pull BPV from the tubing hanger per Vault procedure. 12. Call out Centrilift to pull ESP and pull tubing hanger. Lubricate BPV if risk of pressure below. - mgr Well: SP-28 PTD: 215-134 API: 50-629-23556-00-00 13. RU tubing handling equipment. 14. Pump approximately 10 bbl/hour (+ pipe displacement while pulling pipe) of 8.6 ppg 3% KCl/NaCl brine down the annulus throughout the operations to maintain well fill. 15. POOH with 4-1/2” ESP completion standing back tubing and laying down ESP. Record number of clamps recovered. 16. PU 4-1/2” work string (tubing pulled from SP33) and RIH with Cleanout/VACS assembly as outlined below: 17. RIH to 50’ above the top of liner and mark pipe. RIH to top of liner at 30 fpm (roughly 1 min per joint) using VACS tool. 18. POOH and lay down cleanout/VACS BHA a. Break down BHA capturing sand in containment. Report amount of sand captured in daily report. Inspect and empty washpipe and VACS tool. 19. PU and RIH with 5-1/2” liner cleanout assembly as outlined below: Well: SP-28 PTD: 215-134 API: 50-629-23556-00-00 20. RIH until BHA is approximately 30’ above liner top. Break circulation and record working parameters of VACS. 21. Slowly wash down into liner top and while maintaining operating parameters of the VACS. Wash down till snorkel pipe is 1,800’ into the liner. 22. POOH with VACS cleanout BHA laying down 2-7/8” snorkel pipe and 4-1/2” work string. a. Break down BHA capturing sand in containment. Report amount of sand captured in daily report. Inspect and empty washpipe and VACS tool. 23. Call Operations Engineer after each cleanout run to discuss sand returns. 24. RIH with 4-1/2” 12.25# L-80 TK-15XT and ESP completion to +/- 14,025’ with duel encapsulated capillary strings. a. Check electrical continuity every 1000’. b. Note PU and SO weights on tally. c. Install ESP clamps per Baker, and cross coupling clamps every other joint 25. Land tubing hanger. Use extra caution to not damage cable. 26. Lay down landing joint. 27. Set BPV. 28. ND BOPE and NU tree. 29. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV. 30. RDMO Doyon 15. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOPE Schematic 4-½” 12.6 ppf L80 TK-15XT(Internally Coated) Hydril 563Production TubingHAL 5-½” Oil SwellPackerSP28-NW3Dual Lateral Producerwith ESP LiftNikaitchuq Field –Spy IslandAs Completed03/26/2021 16,221' MD, 3,591 TVD– L1 - Baker SLXP LinerHanger/Packer16,318'-16,363' MD,3,598-3,601' TVDCasing Exit Window4-½” x-cplg cable clamps, for ESP PowerCable, (1) 3/8" Chem Inj Line with 2500#Check Valve on the Motor Centralizer+/-14,025' MD,3322' TVD - Discharge Gauge Sub+/-14,102' MD, 3335' TVD, 79º Inc – Bottom of MotorCentralizer Centrilift, ESP, 66 stages 538PMSXDFlex47 + 20stages Ginpsh, 513 GSB3 Seals,250HP XP562 Motor.+/- 14,106' MD -7" 23# Shroud Assembly withcable and chemical injection line feed-thru.Surf. Casing13-3/8", 68 # 2,788' MD,2,452' TVD55º Inc.Interm. Casing9-5/8", 40#16,552' MD, 3,615' TVD87º Inc.16,362' MD, 3,601' TVDBaker MLXP LinerHanger/PackerTD 8 3/4”24,986' MD,3,552' TVD 93º Inc.5-½” 15.5 ppf L80 Blank Liner18,430-18,984' MD,20,859-21,050' MD,24,181'-24,591 MDWater Zone CoverageSilver Bullet Ecc. Nose Guide Shoe 24,615' MD, 3,568' TVD, 93º Inc.Silver Bullet Ecc. NoseGuide Closed Shoe 23,156 MD, 3,584' TVD,90º Inc.TD 8 3/4”23,200' MD,3,584' TVD90º Inc.5-½” 15.5/17 ppfL80 Slotted LinerSealbore Receptacle4.75" ID16,307' MD RAM Hanger5.960" Lateral Drift ID3.688" Mainbore Drift ID4-½” x 9-5/8" RAMSeal Bore Diverterw/ 3.68" Seal BoreBottom of SealAssembly4 ½” Lateral EntryModule (LEM) w/ 3.68Seal BoreDate Activity10/15/2015Drill and Complete withconventional ESP3/22/2017Pull failed ESP and replacewith conventional ESP3/26/2021Pull ESP due to tubing leakand replace with coatedtubing and new conventionalESPWell History 4-½” 12.6#TK-15XT Production TubingHAL 5-½” Oil SwellPackerSP28-NW3Dual Lateral Producerwith ESP LiftNikaitchuq Field –Spy IslandProposed Nov 2024 16,221' MD, 3,591 TVD– L1 - Baker SLXP LinerHanger/Packer16,318'-16,363' MD,3,598-3,601' TVDCasing Exit Window4-½” x-cplg cable clamps, for ESP PowerCable, (2) 3/8" Chem Inj Line with 2500#Check Valve on the Motor Centralizer~14,025' MD, ~3322' TVD - Discharge Gauge Sub~14,102' MD, ~3335' TVD, 79º Inc – Bottom of MotorCentralizer Centrilift, ESP~14,106' MD -7" 23# Shroud Assembly withcable and chemical injection line feed-thru.Surf. Casing13-3/8", 68 # 2,788' MD,2,452' TVD55º Inc.Interm. Casing9-5/8", 40#16,552' MD, 3,615' TVD87º Inc.16,362' MD, 3,601' TVDBaker MLXP LinerHanger/PackerTD 8 3/4”24,986' MD,3,552' TVD 93º Inc.5-½” 15.5 ppf L80 Blank Liner18,430-18,984' MD,20,859-21,050' MD,24,181'-24,591 MDWater Zone CoverageSilver Bullet Ecc. Nose Guide Shoe 24,615' MD, 3,568' TVD, 93º Inc.Silver Bullet Ecc. NoseGuide Closed Shoe 23,156 MD, 3,584' TVD,90º Inc.TD 8 3/4”23,200' MD,3,584' TVD90º Inc.5-½” 15.5/17 ppfL80 Slotted LinerSealbore Receptacle4.75" ID16,307' MD RAM Hanger5.960" Lateral Drift ID3.688" Mainbore Drift ID4-½” x 9-5/8" RAMSeal Bore Diverterw/ 3.68" Seal BoreBottom of SealAssembly4 ½” Lateral EntryModule (LEM) w/ 3.68Seal BoreDate Activity10/15/2015Drill and Complete withconventional ESP3/22/2017Pull failed ESP and replacewith conventional ESP3/26/2021Pull ESP due to tubing leakand replace with coatedtubing and new conventionalESPWell History 1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: ESP change out Eni US Operating Co. Inc. Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number):8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 24,615 feet N/A feet true vertical 3,568 feet N/A feet Effective Depth measured 24,615 feet N/A feet true vertical 3,568 feet N/A feet Perforation depth Measured depth 16,552-24,615 feet True Vertical depth 3,615-3,568 feet Tubing (size, grade, measured and true vertical depth)4.5 L-80 14,025 3322 Packers and SSSV (type, measured and true vertical depth)N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Contact Name: Authorized Title: Contact Email: 4/19/2021 Contact Phone: Senior Engineer:Senior Res. Engineer: Slotted Collapse 0 2480 4790 0 Burst 0 5210 6890 0 160 2452 3615 0 3568 Slotted 13.375" 9.625" 0 5.5" 16552 0 24615 Authorized Signature with date: Authorized Name: Liner Length 160 2788 16552 0 8253 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 321-068 134 Size Conductor Surface Intermediate Production measuredPlugs Junk measured N/A Casing Structural 20" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 214-067 50--629-23556-00-00 N/A 5. Permit to Drill Number: Schrader Bluff Oil Pool 2. Operator Name 4. Well Class Before Work: 180 Representative Daily Average Production or Injection Data 125820 Casing Pressure Tubing Pressure 388572, 388574, 388575, 388583, 391283 133 measured true vertical Packer 3700 Centerpoint Dr. Ste 500, Anchorage, AK, 99503 3. Address: SP28-NW3 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 260 Gas-Mcf MD 160 2788 520 0146 TVD Stefano Pierfelici Well Operations Project Manager Amjad Chaudhry amjad.chaudhry@eni.com 907-865-3379 N/A WINJ WAG 97 Water-BblOil-Bbl t Fra O 214 6. A G L PG , R t Form 10-404 Revised 3/2020 Submit Within 30 days of Operations By Samantha Carlisle at 4:35 pm, Apr 19, 2021 Digitally signed by: Stefano Pierfelici DN: CN = Stefano Pierfelici C = AD Date: 2021.04.19 16:16:53 -08'00' Stefano Pierfelic i DSR-4/20/21VTL 5/5/21 3,552 SFD 4/20/2021 215-134 24,986 SFD 4/20/2021 RBDMS HEW 4/20/2021 4-½” 12.25ppfL80TK-15XT(Internally Coated) Hydril 563Production TubingHAL 5-½” Oil Swell PackerSP28-NW3Dual Lateral Producerwith ESP LiftNikaitchuq Field–Spy IslandAsCo pleted03/26/2021 16,221' MD, 3,591 TVD– L1 - Baker SLXP LinerHanger/Packer16,318'-16,363' MD,3,598-3,601' TVDCasing Exit Window4-½” x-cplg cable clamps, for ESP PowerCable, (1) 3/8" Chem Inj Line with 2500#Check Valve on the Motor Centralizer14,025' MD,3322' TVD - Discharge Gauge Sub14,102'MD,3335' TVD, 79º Inc–Bottom of Motor Centralizer Centrilift, ESP, 66stages 538PMSXD Flex47 + 20stages Ginpsh, 513 GSB3 Seals, 250HP XP562 Motor.14,106' MD -7" 23# Shroud Assembly with cable and chemical injection line feed-thru.Surf. Casing13-3/8", 68 # 2,788' MD,2,452' TVD55º Inc.Interm. Casing9-5/8", 40#16,552' MD, 3,615' TVD87º Inc.16,362' MD, 3,601' TVDBaker MLXP LinerHanger/PackerTD 8 3/4” 24,986' MD,3,552' TVD 93º Inc.5-½” 15.5 ppf L80 Blank Liner18,430-18,984' MD,20,859-21,050' MD,24,181'-24,591 MDWater Zone CoverageSilver Bullet Ecc. Nose Guide Shoe24,615' MD, 3,568' TVD, 93º Inc.Silver Bullet Ecc. NoseGuide Closed Shoe23,156 MD, 3,584' TVD,90º Inc.TD 8 3/4” 23,200' MD,3,584' TVD90º Inc.5-½” 15.5/17 ppfL80 Slotted LinerSealbore Receptacle4.75" ID16,307' MD RAM Hanger5.960" Lateral Drift ID3.688" Mainbore Drift ID4-½” x 9-5/8" RAMSeal Bore Diverterw/ 3.68" Seal BoreBottom of SealAssembly4½” Lateral Entry Module (LEM) w/ 3.68Seal Bore :HOO1DPH631:25 :HOOERUH1DPH631: :HOO&RGH -RE:25.29(5 :&(,/(9(/ 'DLO\5HSRUW 'DWH 5HSRUW 3DJHRI :HOO+HDGHU 3HUPLW&RQFHVVLRQ1ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±5LJGRZQFXWWLQJER[FKXWHDQGURFNZDVKHUEORZGRZQVWHDPWRSLWPRGXOHDQGURFNZDVKHU&RQWLQXHZRUNRQ  LQWHUFRQQHFWVRQVXEDQGSLWPRGXOHV5HPRYHFXWWLQJER[IURPURFNZDVKHU&UDQHSUHSDQGUHPRYH+DOOLEXUWRQPXGORJJHU  VKDFNIURPLQIURQWRIULJ0RYHPXGHQJLQHHUVKDFNDQGURFNZDVKHUIURPSLWPRGXOH6SUHDGKHUFXOLWHDQGPDWWLQJERDUGV  IRUPRYH     02% $  3 3-60±3LFNXSVKLPVGXQQDJHFRQWLQXHVSUHDGLQJKHUFXOLWHDQGOD\LQJPDWWLQJERDUGVIRUPRYHWR631:6ZLWFKULJ  VKRSSRZHUWRFROGVWDUWJHQHUDWRU-DFNXSSLWPRGXOHUHPRYHVKLPVSXOODZD\IURPVXEPRGXOHDQGPRYHWR63  VWDJLQJDUHD-DFNXSVXEPRGXOHDQGUHPRYHVKLPGXQQDJH  1RWH1RWLILHG$2*&&#KUVRIXSFRPLQJ%23WHVWIRU63RQ#KUV*X\&RRNUHVSRQGHG#  KUVZDLYHGXQOHVVFRQWDFWHGE\DQRWKHULQVSHFWRU     02% $  3 3-60±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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±&RPSOHWHVSRWWLQJDQGVKLPPLQJSLWPRGXOHWRVXEPRGXOH6NLGULJIORRULQWRGULOOLQJSRVLWLRQDQGVHFXUH,QVWDOO  KDQGUDLOVJUDWLQJDQGURRIFRYHUV      02% $  3 3-60±,QVWDOOLQWHUFRQQHFWOLQHVXQGHUULJIORRU6WDUWEHUPLQJDURXQGULJ6HWVXLWFDVHVHFWLRQIURPYDOYHKRXVHDQGFRQQHFW  VHUYLFHOLQHV6SRWPXGSXPSPXGHQJLQHHUVKDFNE\SLWPRGXOH+RRNXSIORZOLQHWRSLWPRGXOH3OXJLQWRSGULYHWR  9)'KRXVH     02% $  3 3-60±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±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±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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±%ORZGRZQOLQHVDQGULJGRZQKLJKSUHVVXUHIURPWXELQJVLGH5LJXSKROHILOOOLQHRQ$DQQXOXVWRILOOZLWKSSJ  .&/1D&OEULQH9DXOWUHSSXOOHGWUHHFDSDQGLQVWDOOHG%39UHLQVWDOOHGWUHHFDSSUHSWRQLSSOHGRZQ     :2 &  3 3-60±1LSSOHGRZQWUHHUHPRYH*UD\ORFNFRQQHFWLRQDQGSXOOWUHHLQWRFHOODU,QVSHFWWXELQJKDQJHUDQGUHPRYHDQGFDS  WKHFDSLOODU\OLQHIURPZHOOKHDG,QVWDOOSODWHWRSXOOIDOVHERZODQGLQVWDOOWHVWGDUWLQWXELQJKDQJHU3XPSLQJ%3+RI  SSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWR$DQQXOXV     :2 &  3 3-60±,QVWDOOKLJKSUHVVXUHULVHUDQG%23VWDFNRQZHOOKHDG,QVWDOOFKRNHNLOOOLQHPDQXDO+&5YDOYHVRQVWDFNFRQQHFW  KLJKSUHVVXUHKRVHVWRVDPHWRUTXHEROWVWRVSHF&RQWLQXHSXPSLQJ%3+RISSJ.&/1D&OEULQHWUHDWHGZLWK  ELRFLGHLQWR$DQQXOXV     :2 &  3 3-601LSSOHXSORZSUHVVXUHULVHUDQGIORZOLQHWRSLWVRQDQQXODULQVWDOODLUERRWVDQGVXSSO\DLUOLQHV&RQQHFWGUDLQOLQHV  IURPGULSSDQWRVORSWDQN,QVWDOO%23DFFXPXODWRUKRVHVWRVWDFNFRPSRQHQWVSUHVVXUHXSV\VWHPDQGYHULI\IXQFWLRQVRI  DQQXODUDOOUDPVDQG+&5YDOYHV6HFXUH%23VWDFN3XPS%3+RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWR  $DQQXOXV     :2 &  3 3-60±,QVWDOO´WHVWMRLQWRQWRWHVWEODQNLQJSOXJSUH9DXOWUHS)OXLGSDFN%23VWDFNDQGFRPSRQHQWVSXUJHDLUDQG  SHUIRUPVKHOOWHVWWRSVL JRRGWHVW &RQWLQXHDGGLQJ%3+RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWR$  DQQXOXV     :2 &  3 3-607HVW%23(FRPSRQHQWVORZKLJKIRUPLQXWHLQWHUYDOVIRUHDFKDQQXODUDQGYDULDEOHUDPVZLWK´DQG  ´WHVWVMRLQWLQVHTXHQFHWHVWHGFKRNHPDQLIROGFKRNHNLOODQG+&5YDOYHV3HUIRUPEOLQGUDPWHVWDQGERWK$%FKRNHVWR  SVLZLWKREVHUYHGSUHVVXUHEOHHGV7HVWHGDOO+6DQG/(/JDVVHQVRUVDQGDODUPOLJKWVIORZVHQVRUDQG397DODUPV  3HUIRUPDFFXPXODWRUGUDZGRZQWHVWVWDUWLQJSUHVVXUHRI36,DIWHUIXQFWLRQSUHVVXUH36,36,UHFRYHU\  VHFRQGVIXOOUHFRYHU\VHFRQGV1EDFNXSERWWOHDYHUDJH36,&RQWLQXHDGGLQJ%3+RI33*  .&/1D&OZLWKELRFLGHGRZQ$DQQXOXVGXULQJWHVWSURFHVV 127($OO7HVWV3DVVHG     :2 &  3 5LJGRZQWHVWHTXLSPHQWDQGSXOO¶´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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±5LJGRZQWHVWHTXLSPHQWDQGEORZGRZQOLQHV3XWSSJ.&/1D&OEULQHELRFLGHWUHDWHGLQ$DQQXOXV     :2 0  3 3-60±0RELOL]HGHQYLURQPHQWKRVHWRULJDQGLQVWDOOHGRQ(63FDEOHVKHDYHLQGHUULFN58%DNHU&HQWULOLIWDQG*%5  HTXLSPHQW0RELOL]HWKUHDGSURWHFWRUVWRULJIORRU      :2 &  3 3-60±9DXOWUHSSXOOHG%39LQVWDOOHGODQGLQJMRLQWLQWXELQJKDQJHUDQGPDNHXSWRSGULYH9DXOWUHSEDFNRXWORFNGRZQ  SLQVIURPWXELQJKDQJHU      :2 /  3 3-60±3XOOKDQJHUIUHHZRUNLQJZHLJKWXSIURP.WR.ILUVWSXOOWR.KDQJHUIUHH&RQWLQXHSXOOWXELQJKDQJHUWR  ULJIORRUZLWKIUHHWUDYHOXSZHLJKWRI.UHPRYHFDSLOODU\OLQHDQG(63SHQHWUDWRUFDEOHIURPWXELQJKDQJHU/'  KDQJHUSXSMRLQWDQGODQGLQJMRLQW$WWDFKHGDQGVHFXUH(63FDEOHDQGFDSLOODU\WRURSHIURPVSRROLQJXQLW6ZLWFKWRWULSWDQN DQGSXPSHG%3+RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRKROH     :2 /  3 3-60±3XOORXWOD\GRZQ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURP¶WR¶8SZW .  3XPS%3+ SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV      :2 /  3 3XPSWXELQJYROXPHRIEEOV#¶ZLWK,&3ESP#SVLDQG)&3#ESP#SVL%ORZGRZQPXGOLQH  DQGIXHO*%5XQLWLQVLGHWKHH[FOXVLRQ]RQH     :2 /  3 3-60±&RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURP¶WR¶8SZW .  3XPS%3+ SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV      :2 /  3 3XPSWXELQJYROXPHRIEEOV#¶ZLWKESP#SVL EEOVWRILOOSLSH %ORZGRZQPXGOLQH     :2 /  3 &RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURP¶WR¶8SZW .3XPS  %3+ SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV      :2 /  3 %DNHU&HQWULOLIWUHPRYHG3)7PHFKDQLFDOVSOLFHIURP(63FDEOHSHUIRUPHGFULPSVSOLFHDVSHUSURFHGXUH     :2 /  3 &RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURP¶WR¶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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±&RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURPWR¶8SZW .3XPS  %3+ SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV     :2 /  3 3-60±3XPSWXELQJYROXPHRIEEOV#¶ZLWKESP#SVL%ORZGRZQPXGOLQH     :2 /  3 &RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURPWR¶8SZW .3XPS%3+  SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV     :2 /  3 3-60±3XPSWXELQJYROXPHRIEEOV#¶ZLWKESP#SVL%ORZGRZQPXGOLQH     :2 /  3 &RQWLQXHSXOOLQJ´WXELQJ SSI/+<' DQG(63DVVHPEO\IURPWR¶8SZW .3XPS%3+  SOXVSLSHGLVSODFHPHQW RISSJ.&/1D&OEULQHWUHDWHGZLWKELRFLGHLQWRDQQXOXV      :2 /  3 3-60/D\GRZQ(63DVVHPEO\SXPSVWDQGHPVHDOVPRWRU0*8VHQVRUFHQWUDOL]HUDQGVKURXG&RQWLQXHDGGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 0  3 3-606WUDSDQGWDOO\´FRPSOHWLRQWXELQJ3UHSQHZ(63DVVHPEO\SXPSLQSLSHVKHGDVSHU%DNHU&HQWULOLIW&RQWLQXH  DGGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 0  3 3-60±&OHDUDQGFOHDQULJIORRURI(63FRPSRQHQWVFODPSVDQGXQVWULQJ(63FDEOHDQGFDSLOODU\OLQHIURPGHUULFNVKHDYHV  UHPRYHROGWXELQJKDQJHU0RELOL]HQHZFODPSV%DNHUSXPSWRWHWXELQJKDQJHUDQGIDVWVZLYHOSXSVWRULJIORRU5HPRYH  HQYLURQPHQWKRVHIURP(63VKHDYHLQGHUULFN6ZDSRXWFDSLOODU\UHHOV&RQWLQXHDGGLQJ%3+RISSJ.&/1D&O  ZLWKELRFLGHLQWRDQQXOXV      :2 0  3 3-60±&RQWLQXHWRFKDQJHRXWFDSLOODU\DQG(63FDEOHUHHOVLQVSRROLQJXQLW3UHS*%5WRQJVDQGSHUIRUPGXPSWHVWRQ  WXELQJ JRRGWHVW %DNHU&HQWULOLIWSXPSHGWKURXJKFDSLOODU\OLQHWRFRQILUPFOHDUDQGWHVWWRSVLDQGSVL JRRG  WHVW      :2 .  3 3-603LFNXS´PRWRUVKURXGDQGKDQJHUSXS*%5WRUTXHWRVSHF%DNHU&HQWULOLIWPDNHXSPRWRUDVVHPEO\±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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU 2YHUFDVW 7HPSHUDWXUH ƒ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´WXELQJDVSHUSURFHGXUH 2SHUDWLRQDW 5XQ,Q+ROH:(63&RPSOHWLRQ# 7LPH/RJ 6WDUW 7LPH (QG 7LPH 'XU KU &XP'XU KU 3KDVH 2SU $FW 3ODQ 2SHU'HVFU     :2 .  3 3-60%DNHU&HQWULOLIWPDGHXS(63FRPSOHWLRQDVVHPEO\SHUSURFHGXUHDQGWDOO\)UHHURWDWLRQRQDOOFRPSRQHQWVVHUYLQJ  PRWRUDQGWDQGHPVHDOVZLWKRLODQGSOXJVUHLQVWDOOHGYHULI\SDUWVHULDOQXPEHURIFRPSRQHQWV ZLWQHVVE\(1,UHS $GGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-603LFNXS(63DVVHPEO\DQGLQVWDOO´FHQWUDOL]HUFKHFNYDOYHDQGFDSLOODU\OLQHDQG=HQLWK7(&OLQHORZHULQJ  LQWR´VKURXGDQGLQVWDOO0/(LQWRPRWRUSRWKHDG&RQWLQXHORZHULQJDVVHPEO\DQGLQVWDOOLQJSURWHFWRUVDQGFODPSVDV  SHU%DNHU&HQWULOLIWDQGSURFHGXUH$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-606WULQJ(63FDEOHDQGFDSLOODU\OLQHWKURXJKVKHDYHVLQGHUULFNIURPVSRROLQJKRXVHWRULJIORRU$GGLQJ%3+RI  SSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60±3HUIRUPHGFRQWLQXLW\WHVWDQGJDXJHFKHFNVRQ0/(%DNHUVSOLFHG(63FDEOHWR0/( ZLWQHVVE\(1,HOHFWULFLDQ   $IWHUVSOLFHSUHIRUPHGFRQWLQXLW\WHVWRQ(63FDEOHDQGUHFRUGLQVSRROLQJXQLW3HUIRUPWHVWRQFDSLOODU\ó´[´FRQQHFWLRQ  WRSVLIRUPLQHV GU\JRRGWHVW &RQWLQXHWRSUHVVXUHXSDQGREVHUYHGFKHFNYDOYHRSHQLQJ#SVL  FRQWLQXLQJWRSXPSWKURXJKIRUPLQ6WRSSXPSLQJDQGREVHUYHGFKHFNYDOYHFORVLQJ#SVL%OHHGFDSLOODU\OLQHWR  SVLIRUPRQLWRULQJZKLOH5,+$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶WR  ¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQDOO  FRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶DQGPRQLWRUFDSLOODU\OLQHZLWKSVL$GGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60±3XPSWXELQJYROXPHZLWKUDWHRIESP#SVLWRWDORIEEOV%ORZGRZQPXGOLQH     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶  WR¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQ  DOOFRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶DQGPRQLWRUFDSLOODU\OLQHZLWKSVL$GGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-60±3XPSWXELQJYROXPHZLWKUDWHRIESP#SVLWRWDORIEEOV%ORZGRZQPXGOLQH     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶  WR¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQ  DOOFRQQHFWLRQ$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV  1RWHKUORVV EEOVSSJRI.&/1D&OEULQHZLWKELRFLGH7RWDOORVV EEOV *DV5HDGLQJV $YJ%DFNJURXQG*DV   0D[%DFNJURXQG*DV   $YJ&RQQHFWLRQ*DV   0D[&RQQHFWLRQ*DV   $YJ'ULOO*DV   0D['ULOO*DV   $YJ7ULS*DV   0D[7ULS*DV   :HOO1DPH631:25 :HOOERUH1DPH631: :HOO&RGH -RE:25.29(5 :&(,/(9(/ 'DLO\5HSRUW 'DWH 5HSRUW 3DJHRI 'DLO\0XG9ROXPHV 7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPH EEO +ROH +ROH  /RVV +ROH  7DQN $FWLYH  &XPXODWLYH0XG9ROXPHV $FWLYH9ROXPH EEO  +ROH9ROXPH EEO  $GGLWLRQV EEO  &XP$GGLWLRQV EEO  /RVVHV EEO  &XP/RVVHV EEO  'DLO\&RQWDFWV 3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH (QLUHSUHVHQWDWLYH $QWRQ*UHVV $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP  (QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP  (QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP  6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP  7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP  7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP  6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP  6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP  3HUVRQQHO/RJ 32% &RPSDQ\ 6HUY7\SH :RUN+ KU 6WDQGE\+ KU &RXQW 1RWH . 0 (5'   6&+/80%(5*(5 &HPHQW   6&+/80%(5*(5 0:'   6&+/80%(5*(5 ''   536 *HRORJLVW   $65&(QHUJ\6HUYLFHV 5LJFOHUN   $65&(QHUJ\6HUYLFHV 62$   $65&(QHUJ\6HUYLFHV /LIW$GYLVRU   %($&21 +6(   &203(7(17,$ )XHOHU   +$//,%85721 0XG/RJJHUV   6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU   9DXOW :HOOKHDG   $65&(QHUJ\6HUYLFHV &RPSDQ\PDQ   ([SUR )ORZEDFN6HUYLFH   *%5 &DVLQJ6HUYLFH   %DNHU+XJKHV %DNHU+XJKHV   6&+/80%(5*(5 6/%0,6ZDFR 0XGSODQW   6&+/80%(5*(5 6/%:,)   :25/(< 5LJ6XSSRUW   '2<21 2QVKRUH5LJ   %236WDFN &RPSRQHQWV 'HVFULSWLRQ %236WDFN 6WDUW'DWH  /DVW&HUWLILFDWLRQ'DWH  3UHVVXUH5DWLQJ SVL  7\SH 0DNH 0RGHO ,'1RP LQ 35DQJH SVL /DVW&HUW'DWH $QQXODU +\GULO *.    ;9%5 V +\GULO 03/    %OLQG6KHDU5DP +\GULO 03/    [9%5V +\GULO 03/    6ORZ&LUFXODWLRQ5DWHV 3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR 6WDUW'DWH (QG'DWH /LQHU6L]H LQ 9ROXPH3HU6WURNH2YHUULGH EEOVWN 0D[3UHVVXUH SVL 'DWH 'HSWK IW.% 6ORZ6SG 6WURNHV VSP 3 SVL (II  4)ORZ JSP 3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR 6WDUW'DWH (QG'DWH /LQHU6L]H LQ 9ROXPH3HU6WURNH2YHUULGH EEOVWN 0D[3UHVVXUH SVL 'DWH 'HSWK IW.% 6ORZ6SG 6WURNHV VSP 3 SVL (II  4)ORZ JSP 3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3 6WDUW'DWH (QG'DWH /LQHU6L]H LQ 9ROXPH3HU6WURNH2YHUULGH EEOVWN 0D[3UHVVXUH SVL 'DWH 'HSWK IW.% 6ORZ6SG 6WURNHV VSP 3 SVL (II  4)ORZ JSP 'DLO\%XON 6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH 'DWH  &RQVXPHG  5HFHLYHG  5HWXUQHG &XP&RQVXPHG  &XP5HFHLYHG  &XP5HWXUQHG  &XP2Q/RF  1RWH 6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH 'DWH  &RQVXPHG  5HFHLYHG  5HWXUQHG &XP&RQVXPHG  &XP5HFHLYHG  &XP5HWXUQHG  &XP2Q/RF  1RWH 6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH 'DWH  &RQVXPHG  5HFHLYHG  5HWXUQHG &XP&RQVXPHG  &XP5HFHLYHG  &XP5HWXUQHG  &XP2Q/RF  1RWH 6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH 'DWH  &RQVXPHG  5HFHLYHG  5HWXUQHG &XP&RQVXPHG  &XP5HFHLYHG  &XP5HWXUQHG  &XP2Q/RF  1RWH 6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH 'DWH  &RQVXPHG  5HFHLYHG  5HWXUQHG &XP&RQVXPHG  &XP5HFHLYHG  &XP5HWXUQHG  &XP2Q/RF  1RWH /DVW$XWKRULW\9LVLW 'DWH  7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW $2*&&*X\&RRN:DLYHG:LWQHVVWR%23(7HVW1H[W7HVWGXH 6723&DUGV6XEPLWWHG &RPSDQ\ 5SWV &RP 'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ :HOO1DPH631:25 :HOOERUH1DPH631: :HOO&RGH -RE:25.29(5 :&(,/(9(/ 'DLO\5HSRUW 'DWH 5HSRUW 3DJHRI 6723&DUGV6XEPLWWHG &RPSDQ\ 5SWV &RP 'R\RQ'ULOOLQJ,QF 6WRS:RUN 'R\RQ'ULOOLQJ,QF3-60 V 'R\RQ'ULOOLQJ,QF +D]DUG,' ([SUR 2EVHUYDWLRQ ([SUR 6WRS:RUN ([SUR +D]DUG,' 0,6ZDFR 6WRS:RUN 0,6ZDFR 2EVHUYDWLRQ :RUOH\(QYLURQPHQW :RUOH\ 2EVHUYDWLRQ :RUOH\ 6WRS:RUN *HQHUDO1RWHV &RPPHQW :HOO1DPH631:25 :HOOERUH1DPH631: :HOO&RGH -RE:25.29(5 :&(,/(9(/ 'DLO\5HSRUW 'DWH 5HSRUW 3DJHRI :HOO+HDGHU 3HUPLW&RQFHVVLRQ1ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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´WXELQJSHUWDOO\ZLWK(63FRPSOHWLRQDVVHPEO\SHUSURFHGXUH 2SHUDWLRQDW 5XQ,Q+ROH:(63&RPSOHWLRQ# 7LPH/RJ 6WDUW 7LPH (QG 7LPH 'XU KU &XP'XU KU 3KDVH 2SU $FW 3ODQ 2SHU'HVFU     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶  WR¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQ  DOOFRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶DQGPRQLWRUFDSLOODU\OLQHZLWKSVL$GGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-60±&KDQJHRXW(63FDEOHUHHOVLQVSRROLQJXQLW     :2 .  3 3-60±%DNHU&HQWULOLIWVSOLFHG(63FDEOHLQVSRROLQJXQLW$IWHUVSOLFHSUHIRUPHGFRQWLQXLW\WHVWRQ(63FDEOHDQGUHFRUGLQ  VSRROLQJXQLW ZLWQHVVE\(1,HOHFWULFLDQ 0RQLWRUSVLRQFDSLOODU\OLQH$GGLQJ%3+RISSJ.&/1D&OZLWK  ELRFLGHLQWRDQQXOXV      :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶  WR¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQ  DOOFRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶0RQLWRUSVLRQFDSLOODU\OLQH$GGLQJ  %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-60±3XPSWXELQJYROXPHZLWKUDWHRIESP#SVLWRWDORIEEOV%ORZGRZQPXGOLQH0RELOL]HGQHZFURVV  FROODUFODPSVWRULJIORRU      :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP¶  WR¶'QZW N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSV  RQDOOFRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶0RQLWRUSVLRQFDSLOODU\OLQH$GGLQJ %3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-60±3XPSWXELQJYROXPHZLWKUDWHRIESP#SVLWRWDORIEEOV%ORZGRZQPXGOLQH     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP  ¶WR¶'QZW NVWDUWHGORVLQJVWDFNRIIZHLJKW7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULV  UHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQDOOFRQQHFWLRQ$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWR  DQQXOXV    :2 .  3 8QDEOHWRUXQLQKROHSDVV¶GXHWRORVVRIVODFNRIIZHLJKW3LFNXSWRRQVWULQJDWWHPSWHGRQHWLPH8SZW  N'QZW N&RQVXOWZLWKWRZQ±ORFDWHGVKRUW;2WRPDNHXS´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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±3HUIRUP3DVVSRUWWHVW K6XPPDU\ &RPSOHWHUXQDQGODQGRI(63FRPSOHWLRQDVVHPEO\SHUSURFHGXUH1LSSOHGRZQ%23 2SHUDWLRQDW ;0DV7UHH3DVVSRUW7HVWLQJ 7LPH/RJ 6WDUW 7LPH (QG 7LPH 'XU KU &XP'XU KU 3KDVH 2SU $FW 3ODQ 2SHU'HVFU     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP  ¶WR¶0DNHXSWRWRSGULYHZLWK;2VXERQ´WXELQJWRDVVLVW(63FRPSOHWLRQDVVHPEO\LQKROHZLWK.  'QZW N WRSGULYHZHLJKW 7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODU  FODPSVRQDOOFRQQHFWLRQ7HVW(63FDEOHIRUFRQWLQXLW\DQGJDXJHUHDGLQJHYHU\¶DQGPRQLWRUFDSLOODU\OLQHZLWK  SVL$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 .  3 3-60±3XPSEEOVRISSJ.&/1D&OZLWKELRFLGHDQGVDIHOXEHGRZQWXELQJUDWHRIESP#SVLVSRW  EEOVLQDQQXOXV     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP  ¶WR¶6FUHZWRSGULYHLQWR´WXELQJZLWK;2WRSXVK(63FRPSOHWLRQDVVHPEO\LQKROHZLWK.'QZW  N7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQDOOFRQQHFWLRQ  0RQLWRUSVLRQFDSLOODU\OLQH$GG%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60±3LFNXS´ /+<'7.;7LQWHUQDOFRDWLQJ WXELQJZLWK(63FRPSOHWLRQDVVHPEO\IURP  ¶WR¶'QZW N&RQWLQXHWRVFUHZLQWRWRSGULYHWRSXVK(63FRPSOHWLRQDVVHPEO\ZKLOHSXPSLQJESP#  SVL7RUTXHWXUQDOOFRQQHFWLRQZLWK*%5 ZLWQHVVE\7HQDULVUHS ,QVWDOOHGFDQQRQFURVVFROODUFODPSVRQDOOFRQQHFWLRQ  0RQLWRUSVLRQFDSLOODU\OLQH$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60±%ORZGRZQWRSGULYH±0DNHXS;2WR´,%7[´77WRODQGLQJMRLQW08ORZHUIDVWVZLYHOWRMRLQW38  ODQGLQJMRLQWDQGWXELQJKDQJHURULHQWDWHKDQJHUSHU9DXOWUHS&RQQHFWLRQWRUTXHWXUQHGE\*%5 :LWQHVVHGE\7HQDULVUHS  WRIWOEV YHULI\JDSPP 5XQLQWR¶WRGUHVVWXELQJKDQJHU$GGLQJ%3+RISSJ.&/1D&OZLWK  ELRFLGHLQWRDQQXOXV     :2 .  3 3-60±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±/DQGWXELQJKDQJHUZLWKERWWRPRIVKURXGDW¶8SZW N'QZW N&RQGXFWILQDOHOHFWULFDOFKHFNV  WKURXJKXPELOLFDO JRRGWHVW 9DXOWUDQLQORFNGRZQVFUHZVDQGWHVWWXELQJKDQJHUERG\VHDOVYRLGWRSVLIRU  PLQXWHV JRRGWHVWZLWQHVVE\(1,UHS $GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV     :2 .  3 3-60%DFNRXWODQGLQJMRLQWRIWRSGULYHDQGWXELQJKDQJHU/'WRSLSHVKHG8QVWULQJ(63FDEOHDQGFDSLOODU\OLQHIURP  GHUULFNVKHDYHVWRVSRROLQJXQLW&OHDUDQGFOHDQ%DNHU&HQWULOLIWHTXLSPHQWDQGFRPSRQHQWVIURPULJIORRU5'*%5OLQHVIRU  ULJPRYH$GGLQJ%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV  :HOO1DPH631:25 :HOOERUH1DPH631: :HOO&RGH -RE:25.29(5 :&(,/(9(/ 'DLO\5HSRUW 'DWH 5HSRUW 3DJHRI 7LPH/RJ 6WDUW 7LPH (QG 7LPH 'XU KU &XP'XU KU 3KDVH 2SU $FW 3ODQ 2SHU'HVFU     :2 &  3 3-60±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ƒ $'/ 2SHUDWRU (1,3(752/(80 6XEVLGLDU\ (1,3HWUROHXP&R,QF ,QLWLDO/DKHH&RGH '(9(/230(17:(// 5RWDU\7DEOH(OHYDWLRQ IW  *URXQG/HYHO IW  )LUVW)ODQJH IW  5.%%DVH)ODQJH IW  5.%7XELQJ6SRRO IW  5LJV 5LJ1DPH 5,* &RQWUDFWRU '2<21 5LJ7\SH /$1'5,* 5LJ1XP  5LJ6WDUW'DWH  5LJ5HOHDVH'DWH  'DLO\,QIRUPDWLRQ :HDWKHU &OHDU:& 7HPSHUDWXUH ƒ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±&RQWLQXH1'%23±3LFNXSVHWVWDFNEDFNRQSHGHVWDODQGUHPRYH´KLJKSUHVVXUHULVHUIURPZHOOKHDG  9DXOWLQVWDOOó´FDSLOODU\OLQHVWKURXJKZHOOKHDGDQGVHWWUHHERQQHW±LQVWDOOFODPSDQGWRUTXHWRVSHF7HVWHGKDQJHUERQQHW  VHDOWR36,IRUPLQ%DNHUUHSSHUIRUPHGILQDOHOHFWULFDOFRQGXFWLYLW\DQGJDXJHUHDGVRQSHQHWUDWRU JRRGWHVW   5HPRYH%39DQGLQVWDOO7:&$GG%3+RISSJ.&/1D&OZLWKELRFLGHLQWRDQQXOXV      :2 &  3 3-605LJXSDQGSHUIRUPHG3DVVSRUWWHVWRQWUHHSHUSURFHGXUH&OHDQSLWVGLVFRQQHFWLQWHUFRQQHFWXQGHUULJIORRUDQG  SUHSPXGSXPSIRUPRYH5LJGRZQWHVWHTXLSPHQWDQGVHFXUHZHOO$GG%3+RISSJ.&/1D&OZLWKELRFLGH  LQWRDQQXOXV     :2 0  3 3-60±&RQWLQXHFOHDQLQJSLWV0RYHPXGSXPS+DOOLEXUWRQPXGORJJHUVPXGPDQVKDFNVDQGDFFXPXODWRUKRXVH  URWDU\RQWUDLOHUZLWKFUDQH 3RZHUGRZQ9)'KRXVHXQSOXJDQGVHFXUHHOHFWULFDOFDEOHVXQGHUULJIORRU6HFXUHWRSGULYHWR  UDLOVIRUPRYH3HUIRUPHGFKHFNOLVWWRVNLGULJIORRU      :2 $  3 3-60±&RPSOHWHGFKHFNOLVWDQGVNLGULJIORRUEDFNRYHUSLSHVKHGLQPRYHSRVLWLRQDQGVHFXUHUDLVHVWRPSHUVRIEDFN  VXSSRUWEHDP 1RWH'LVFRQQHFWHGIRUP+LJK/LQHSRZHU#KUV      :2 $  3 3-60±&RPSOHWHGSLWFOHDQLQJ5'VFDIIROGLQJDQGVXLWFDVHVIURPYDOYHKRXVH5HPRYHKLJKOLQHSRZHUDQGVKRSSRZHU  FDEOHVIURPULJ%ORZGRZQVWHDPDQGZDWHUOLQHV5'EHUPLQJDURXQGULJ/D\KHUFXOLWHIRUQH[WZHOO      :2 $  3 3-60±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y Samantha Carlisle at 9:07 am, Feb 04, 2021 321-068 ADL 388575 SFD 2/4/2021 SFD 2/4/2021VTL 2/5/21 DSR-2/4/21 10-404 X X BOP pressure test to 3500 psig Annular preventer test to 2500 psig 2/8/21 dts 2/8/2021 JLC 2/8/2021 RBDMS HEW 2/9/2021 3700 Centerpoint Drive Suite 500 Anchorage, Alaska 99503 Stefano Pierfelici Phone (907) 865-3320 Email: Stefano.perfelici@eni.com January 25th, 2021 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval for SP28-NW3 Rig Workover Dear Commissioners, ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP28-NW3. SP28-NW3 was completed on Spy Island on October 15th, 2015 with a conventional electric submersible pump set at a depth of 14,089’ MD. This ESP producer was completed without a packer. The well was started up for production in October 2015. On December 10th, 2016 an ESP failure occurred. A workover was successfully performed in March 2017 and the well was put back in production shortly thereafter. To increase oil production, a workover for upsizing the current ESP is planned. The estimated date for beginning this work is March 1st, 2021. Please find attached for the review of the Commission forms 10-403 and supporting documentation. If you have any questions or require further information, please contact Alessio Medea at 907- 865-3347. Sincerely, Stefano Pierfelici Well Operations Project Manager To increase oil production, a workover for upsizing the current ESP is planned. SP28-NW3 was completed on Spy Island on October 15th, 2015 with a conventional electricppy, submersible pump set at a depth of 14,089’ MD. This ESP producer was completed without a packer. SP28-NW3 Workover – Proposal Summary and Wellbore Schematic PTD#: 215-134 Current Status Well SP28-NW3 is currently producing. Scope of Work Scope of this workover is to pull the current ESP tubing completion and recomplete with a new upsized conventional ESP system and coated tubing. Workover has to be completed with no HSE accidents or incidents, to comply with state AOGCC and company requirements. General Well Info Reservoir Pressure/TVD: This well is expected to have a static max bottom hole pressure of approximately 1450 psi (3,615’ TVD) during the time of workover, which places the fluid level below surface. Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi BOP configuration: Annular/Pipe/Blind/Pipe Well type: Producer TIFL/MIT-IA/MIT-OA: Intermediate 9-5/8” casing was tested to 3000 psi during drilling operations on August 28th, 2015. Estimated start date: March 1st, 2021 Drilling Rig: Doyon 15 Drilling Engineer: Alessio Medea Alessio.medea@eni.com Work: 907-865-3347 Well Operations Project Manager: Stefano Pierfelici Stefano.pierfelici@eni.com Work: 907-865-3320 Procedure Summary 1. MURU Doyon 15; 2. Kill the well; 3. Set BPV; 4. N/D X-tree; 5. Set Blanking Plug; 6. N/U BOP and test to 250/3500 psi; 24 hour notice to AOGCC to witness; 7. Pull out of hole Blanking Plug and BPV; 8. POOH tubing and lay down ESP assembly; 9. Perform a contingent clean-out run; 10. PU a test packer, set at 16,180 ft MD to test 9 5/8” casing to 1500 psi; 11. MU new ESP assembly and RIH new coated tubing to setting depth; 12. Land hanger and test it; 13. Install BPV; 14. N/D BOP; 15. N/U tubing adapter and X-tree; 16. Pull BPV; 17. Install Two Way Check Valve and test X-tree; 18. Circulate Freeze protect through X-tree down IA; 19. RDMO. Below the current schematic of the well: Vetco Gray, MB-247/5000 psi RECEIVED STATE OF ALASKA � APR 1 2 2017 ' A OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon Ll Plug Perforations U Fracture Stimulate U 'Pull Tubing U Operations shutdown Li Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ESP change out❑✓ 2.Operator Eni US Operating Co.Inc. 4.Well Class Before Work: 5.Permit to Drill Number: Name: Development D Exploratory ❑ =244-e6f v=t< --l3`i 3.Address: 3800 Centerpoint Dr.Ste 300,Anchorage,AK, Stratigraphic ❑ Service ❑ 6.API Number: 99503 50--629-23556-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: 388572,388574,388575,388583,391283 5P28-NW3 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Schrader Bluff Oil Pool 11.Present Well Condition Summary: Total Depth measured 24,615 feet Plugs measured N/A feet true vertical 3,568 feet Junk measured N/A feet Effective Depth measured 24,615 feet Packer measured N/A feet true vertical 3,568 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Structural Conductor 160 160 160 Surface 2788 13.375" 2788 2452 5210 2480 Intermediate 16552 9.625" 16552 3615 6890 4790 Production Liner 8253 5.5" 24615 3568 Slotted Slotted Perforation depth Measured depth 16,552-24,615 feet True Vertical depth 3,615-3,568 feet SCANNED MAI' 0 2017, . Tubing(size,grade,measured and true vertical depth) 4.5 L-80 13,994 3,316 Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A N/A 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 997 54.7 290 256 258 Subsequent to operation: 896 3809 184 260 271 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations D Exploratory ❑ Development D Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil D Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ 3USP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: aa-7.036- -1-3 - -3'1 Authorized Name: Marc Kuck Contact Name: Amjad Chaudhry Authorized Title: Drilling&Completion Engineering Manager Contact Email: emiad chaudhrv(5eniuetroieum.com Authorized Signature: Date: T�/�7- Contact Phone: 907-865-3379 1/-12,-47 RBDMS q A ^ 1 3 7017 Form 10-404 Revised 4/2017 4 V t- Submit Original Only • • 0 0 Li L d• 2 > 6 c a) CD M _ H CO U o C L m o N = t- Z a a °- N o � I i I m , co W CO W O N U cn U r ' - 1 W (Ol a M W a) co cRI 4-1 I ' N li m N m a) O cDX ami -' 0M Cf) 5 Lo I ' ;. cu - MI in C1 co a. a) N I I ' W = CnO C W N C N o CL C _ I I U i J o (0 a) = J d 00 U) a) 0 C Lt) R I a) 0 0 0 R F- UM � _O mE E d N Cn CO V - t 0 ,lo ' m V o m O L .a N 0 'E N O I I ;. . a) '. rn o'°U Q - C7 Y a d N _ J a N O oo t l!') J N al U °' N C O C L7 0 `c7 a aepi to aoN Xa) v) w M = U = (9 I 'I'1' \ ,-N N (0 N T ° a_ -Q I_ I S 2 Z U I u7 2 X a) O ;' a) m N k m E 0 '' oo 4 m o ) T I a 0 lC) V' p .n ,. 2 CL N mE V ❑ �I J U d. c0 0 p) co— N 3 I a) m En m I W § C. 2 ca 0 L Op O 2i.-..o c � c 0 N co _c C Q 2 > -O N r' N O O C () CO Y 0 o o) -0 in I- c I I' `ov (.j � ri c = = o 0") CO c co - ..o I- v) O (IO 2 ❑ I . O 2 so M O r (0 Co 0 I` c c` v m E C ° 0 I 0 L `o 6-(0 ')-‹' can' M a) `n co U > m m � 2 a it c M 7 ri .�'� � �Nn m H C 0 a) w U I- - + c i W 3 m co co IT v -o C N C f� N >_ r rn O in a c m o > co co O rn m c� M m ti 'd") W m `o ri m / \` o c `v 0 `•5 ti � �R U / i ' �r �o C') 0 ° ❑ a ❑ ❑ J y O a) > C-U ❑ r- 72"7:: az 2 _ v) ' t' \ ci2 — N > u) a) u) .- NN - UcoO O 2 O p m v O ❑ ii cZ a + pc am s aa)) m MXa > J aoa n3 ❑ g a) N O1 Q Cr) E u) cy, C `a-) ❑ ❑ 2 \ co Mm Cw ., - � '�` d V N M� N/ / ` � ' co CP,4 .PL Er CP x V d J ❑ .� E .- m ‘n .- as H o el o u) 0111011 101, , MealE11111111° m co Ci ❑ S` rn O �� ,e 7 e 6 < v M o oo` to LL N N N N N N N ,0/11 N = tf) co ate. crO C -- 00 Lr) tc"J a u R u uIC* u u CO tt ..' N N I w Y 2 • • Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/17/2017 •enii Job: WORKOVER Report Page:e:1 1 1 of 1 Well Header Permit/Concession N" Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(t) 54 13 13 09 17 63 36.50 32.74 Rig Information Rig Name Contractor Rig Type RigNum RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) POB Clear -17.6 N @1 MPH WC-18 3400 34.00 630 Daily Summary Operations 24h Forecast Move In 8 Rig Up on Well SP28-NW3 24h Summery Rig Released from SP12-SES @ 0600 Hrs.Cleaned&Prepped Rig for MIRU to SP28-NW3 Moved Herculite,and Matting Boards into place for Rig Move.Prep&Moved Pit Module Operation at 07.00 Rig Move operations are underway to SP28-NW3 Please Note'.SP12-SE3 is now operational. Time Log Start End Cum Dur Time Time Dur(hr) (Br) Phase Opr. Act. Plan Oper.Descr. 0600 09:00 3.00 3.00 W 0 A 2 P PJSM Cont.to clean Pits and work on Pumps.Prep rig floor to skid RID lines disconnect Glycol lines and IDS Brakes. 0900 14:00 5.00 8.00 W.O. A 2 P Cont.Pit cleaning.RID berms around ng.Blow down water lines to Sub Mod.Fuel ng.Install well shelter cover.Move Gal- Tronics and 1502 cart F/Well Bay 1 to Well Bay 3.Clean up cellar and prep for rig move. 14'.00 17:00 3.00 11.00 W.O. A 2 P Conbnue to clean Pits,Prep Rig Floor to move,Blow down steam.Freeze Protect Washdown Pumps,Remove Rig Berm. 17:00 19:00 200 13.00 W.O. A 2 P Set Herculite For Rig. 19:00 22:00 300 16.00 W.O. A 2 P Set Matting Boards For Rig, 2200 00.00 200 18.00 WO. A 2 P Prep&Move Pit Module Down Pad. Daily Contacts Position Contact Name Company Title Email Office Mobile Em representative Oliver Amend ENI Dolling Supv. 907-685-0715 Em representative Russ Wimmer ENI Drilling Supv. SIODnlling@enipetroleum com 907-685-0715 901-320-0058 Eni representative Wade Thomas ENI Rrg Clerk 907-685-0722 Eni representative Troy England ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rg15@doyondniiing corn 907685-0718 Tool Push Jerry Hansen Doyon Drilling Tool Push Last Casing Seat Cas.Type OD tin) ID(In) Grade Top(ftKB) Bottom(ftKB) TVD Bot.(ftKB) Run Date LINER 51/2 L-80 16,362.0 24,615.0 3.568.2 9/13/2015 • • Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Date: 3/18/2017 • Well Code: 29881 Report#: 2 e n ii Job: WORKOVER Page:1 of 1 Well Header Permit/Concession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 54.13 13 09 1/53 36.50 32 74 Rig Information Rig Name Contractor Rig Type RIG 15 DOYON LAND RIG RigNm 0723 Daily Information Weather Temperature('F) Wind Days LTI(days) Days RI(days) FOB Parry Cloudy -15.1 N @ 5.4 MPH WC-29 35 00 35.00 62-0 Daily Summary Operations 24h Forecast Bullhead 10.5 ppg brine down tubing and IA to kill well.Monitor well and install BPV.N/D Tree and N/U BOPE Rill and lest ROPE.witness waived by Bob Noble. 24h Summary Rig Move A.Preparation Operation at 07.00 Testing Bull Head Lines. Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Opor.Descr. 00'00 1200 12 00 12.00 W 0 A 2 P PJSM Set Mats,Prep to move Sub off well bay.Turn tires and crab down to SP28-NW3.Spot Sub over well.Crab Pit Mod to mate up with Sub Mod.Skid ng floor and install stiff arm on off driller side.R/U lines water,air,choke and kill lines. 12:00 16 30 4 50 16 50 W 0 A 2 P PJSM Cont.work on rig acceptance check list Cont.to hook up lines.berrying,set cutting tank and start steam around ng, spot 8 berm Tiger Tank 16.30 22-30 6.00 22 50 W.O. A 2 P PSIM,Take on 10.5 PPG Bnne to pits SIM-OPS Continue with Rig Acceptance Checklist,Hook up service lines to Rig Floor. Turn on IDS Break Coolant Pump. 22.30 00:00 1.50 24.00 W.0. A 2 P PJSM,RIO 8 Test Mud Pump el.and Mud Line 1/3500 PSI, Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 507-605-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-695-0715 507-320-0058 Eni representative Wade Thomas ENI Rig Clerk 907 585-0772 Eni representative Troy England ENI HOE Tool Push Justin Hays Doyon Dulling Tool Pusn Tool Push Jerry Hansen Doyon Dulling Tool Push Last Casing Seat Can.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftK8) TVD Bot.(ftKB) Run Date LINER 51/2 1.-80 16,362.0 24,615.0 3.568.2 9/13/2015 • s iiiiiii Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/19/2017 enli Job: WORKOVER PaPagge:e: #: 3 1 of 1 Well Header Permit/Concession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WWELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 54.13 13 09 17 63 36 50 32.74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(W) Wind Days LTI(days) Days RI(days) POB Clew _16.2 E @ 7 MPH VVC-35" 36.00 36.00 63.0 Daily Summary Operations 24h Forecast Test BOP's,RID test equipment.M/U landing jnt.pull hanger to floor UD.POOH with 4 5"ESP completion. 24h Summary Complete 0g inspection.R/U to bullhead well/PT lines.Hold PJSM for bullheading.Bullhead 215 bbl 10.5 ppg down tubing and 957 bbls 10.5 ppb Bone down IA.Bleed and monitor well.Well dead.Set BPV.NM tree,WU SOP's.R/U test jnt and equipment.simops work on top drive. Operation at 07.00 Testing BORE. Time Log Start End Corn Our Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 0000 02:30 2.50 2.50 W.0 A 1 P PJSM Complete rig acceptance checklist.Cont.to bring 10 5 ppg NaCl/NaBr Brine into Pits.R/U secondary kill line to IA and Tubing for bull heading. 02:30 03:00 0.50 3.00 W.O. A 12 P PJSM PT Mud Pump#2 and secondary kill line to 2,500 PSI.Blow down lines. 03:00 06:00 3.00 6.00 W.O. A 1 P PJSM Prep for up coming well kill operations.Clean and organize ng.R/U drain hoSes In cellar.Wolk on MP2's.Perform Demck inspection. 06:00 08:30 2.50 8.50 W.O. A 1 P PJSM Hang ESP trunk in Derrick.Grease Choke.NCR's and manual valves on stack. 08:30 09.30 1 00 9.50 W.O. M 1 P PJSM with all personnel on well kill operation.(Bullheading)Review Hazard Recognition Work Sheet. 09:30 11:00 1 50 11.00 W.O. L 9 P Pump 215 bbls 15.5 ppg down tubing @ 3 BPM ICP 2,490 PSI FCP 2.650 PSI.Shut down pumps and Press.bled to zero. Shut in tubing. 11:00 13:30 2 50 13.50 W O. L 9 P Line up on IA and bullhead 957 bbl 10.5 ppg NaCl/NaBr Brine at 8 bpm FCP 1,300 PSI. 13.30 14:30 1 00 14.50 W 0 L 11 P Shut In IA Press.-13 PSI.Blow down lines and IA on Vac,bleed to 0.20 PSI.Tubing Press.-12 PSI,Bleed to 0.20 PSI. Monitor IA and Tubing for 30 Min. 14.30 15:30 1 00 15.50 W 0 L 20 P PJSM.R/D circulating lines and set BPV. 15:30 17:30 2.00 17.50 W.O. L 20 P PJSM.N/D Tree,dress well head,install test dart.Terminate control line. 17.30 21 30 4.00 21.50 W.O. L 20 P PJSM.N/U riser,GOP's.choke and kill lines.Install flow lines. 2130 23:00 1.50 23.00 W 0 L 20 P PJSM.RAJ test it and equipment. 23.00 00:00 1.00 24.00 W.0. L 20 P PJSM Warm up choke house while sim-ops.working on top-dove. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Dnlling Supv ' 907.685-0715 Eni representative Russ Wimmer ENI Dnlling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Mitch Billington ENI Rig Clerk akrigclerksdoyonl5@enipetroleum com 907-6B5-0722 Eni representative Troy England ENI I-1SE Tool Push Justin Hays Doyon Dolling Tool Push Tool Push Jerry Hansen Doyon Dnlling fool Push Last Casing Seat Cas.Type OD(in) ID(in) Grade Top IRKS) Bottom(ftKB) TVD Bot.)ftKB) Run Date LINER 5 1/2 L-80 16.362 0 24619 0' 3.568 2 9/13/2015 • . Iiiiiio Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/20/2017 •2nll Job: WORKOVER Pa #: Pagge:e: I 1 of 1 Well Header PennitlConcession N" Operator Subsidiary Initial Lahee Code ALASKA EM PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB•Tubing Spool(ft) 54 13 13 09 17 63 36.50 32.74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature OF) Wind Days LTI(days) Days RI(days) POB Overcastlight blowing snow 3.3 SW @ 20 MPH WC-22' 37.00 37.03 64.0 Daily Summary Operations 24h Forecast Pull Hanger and POOH 4.5"Tubing,ESP and CAP hoe 24h Summary R/U and TEST BOPE Replace seal on lower ram and test.R/D test Equip.Prep and R/U for POOH.SIMOPS work on Top Dove controls Operation at 07.00 Pulling Hanger Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Opor.Descr. 00:00 01 00 1 00 1 00 W 0 C '1 P PJSM Break apart crossover on FOV,M/U floor valve to dart valve for test SIMOPS work on Top Drive controls. 01D0 03.00 - 2.00 3 00 W 0 C 12 P PJSM Rill Fill stack and flood lines.Line up to test BOP.Perform body test on BOP.Hook up bleed tank to IA and bleed off / thermal expansion QI7 D / 03:00 06'00 3.00 6 00 WO C 12 P PJSM Test ROPE.Annciar Preventer 250 PSI low and 2.500 PSI high.Test with 4.5"test joint to 250 PSI low and 3,500 PSI Y-//�/�j high Choke Valves 1-14.Upper and Lower Rams.TT525 Dart 8 FOSV.Manual Choke 8 Kill,HCR Choke 6 Kill,Kill Line ✓ V' 4 Demon.Lower pipe RAMS leaked.All charted for 5 Min.Decision was made to Cont.test Rams and Draw down test. 'I V" 06:00 08.00 2 00 5.00 W.O. C 12 P PJSM Pull test joint and test Upper and Lower IBOP.Bind Rams to 250 PSI low and 3,500 PSI for 5 Mln all charted.test Manual and Super Choke to 1,500 PSI.All charted. 08:00 09.00 I 00 9.00 W.O. C 1 P Blow down Choke and RiD lines.Evac stack. 09:00 11:00 2.00 11.00 W.O. C 5 P PJSM Remove lower rams.Install new packer and upper seals on 4.5"X 7"Var.Reinstall Rams 11.00 12 30 1 50 12.50 W.O. C 12 P R/U and re test lower rams with 4.S test joint 250 PSI low and 3.500 PSI high,charted,Perform Koomey test:Start Press. Manifold 1,550 PSI,System 2,975 PSI.Annular 525 PSI,after function:Manifold 1,475 PSI,System 1.450 PSI,Annular 550 PSI.200 PSI increase in 47 Sec.Full charge 200 Sec. 5 Nitrogen average 2,375 PSI.AOGCC witnessed waived by Bob Noble 3.19-17. 12.30 13:30 1.00 13,50 W.O. L 5 P L/D teat joint,Slow down choke and Kill lines.RID test Equip and line up choke manifold. 13:30 17.00 3.50 17.00 W.O. L 20 P PJSM L/D Misctools from dg floor.RN ESP thread line in elephant trunk.RN GBR power tongs,M/U floor safety valve.and bring 4.5"thread protectors to rig floor SIMOPS work on Top Drive controls. 17.00 00,00 7.00 24.00 W.O. L 25 TR04 PJSM WO Top-Dove,CIO RWA solenoid.run new electrical lines for top-dove.Set herculite for elephant trunk,Test stand pipe gauge on drillers console. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Sup,. 507-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.core 907-685-0715 50.'320.3055 Eni representatve Mitch Arlington ENI Rig Clerk akrigclerksdoyonl5@enipetroleum core 907-685-0722 Eni representative Troy England ENI I(SF Tool Push Justin Hays Doyon Drilling Tool Post, Tool Push Jerry Hansen Doyon Drilling Tool Push Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) TVD Bot.(RKB) Run Date LINER 51/2 L-60 16.3620 246150 3,568.2 9/13/2015 • • Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/21/2017 • Report#: 5 2 n fl Job: WORKOVER Page:1 of 1 Well Header PermiUConcession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation/5) Ground Level(ft) First Flange OD RKB-Base Flange(It) RKB-Tubing Spool(ft) 54 13 13 09 11 63 36.50 32 74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOVON LAND RIG 0723 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) POB Clear 2.6 WSW @ 20 MPH WC-22 3800 38.00 66.0 Daily Summary Operations 24h Forecast Continue POOH W/4 5"completion string,lay down motor 8 shroud.P/U MIS ESP assembly and shroud.RIH wl 4 5"12.60 LOU- Hyd 563 tubing. 24h Summary Repair Top Drive.pull BPV,Pull hanger.POOH with 4 5"ESP completions F/14.132'to 4.765'mD. Operation at 07.00 POOH W/4.0"ESP completion @ 2.183'MD Time Log Start End Cum Dur Time Time Dur)hr) (hr) Phase Opr. Act. Plan Oper.Descr. 00:00 02'00 2 00 2 00 W 0 L 25 TR04 PJSM Canttrouble shoot Top Drive.Clean up on ng floor.Work on MP2's. 02:00 03:00 1.00 3,00 W 0. A 5 P PJSM P/U 2'hose for ESP drain on sheave.Install 4.5"Elevators. 0300 04:00 1.00 4.00 W.O. L 20 P PJSM Pull BPV and install landing joint as per Baker Rep onsite. 0400 05:00 1.00 5.00 W 0. L '4 P BOLDS.Pull Hanger free at 180K,String weight 165K.Pull Hanger to ng floor 0500 0630 1 50' 6.50 W.O. L 5 P Test and inspect Penetrator and lower connector.Below Hanger ESP fine was stretched.Disconnect lower connector from Penetrator and CAP line.RN to pull through sheaves.L/D Hanger and M. 06.30 11:00 - 4 50 11.00 W.O. L 4 P PJSM Held kick while tripping drill with ESP cable.LID 4.5"563 HOD L-80 1268 Tubing El 14,132'to 11,062'MD.PWT 149K. Filled with double metal displacement 29.5 bbl and Hole fill 10 bph total pumped 81 bbls of 10.5 ppg Brine. 11:00 12:00 100 12.00 W 0. L 7 P R/U to Coro.tubing volume 169 bbl @ 2 bpm,500 PSI. 12.00 13:00 1.00 13.00 W 0. L 7 P PJSM with all personnel for POOH and L/D tubing.Perform kick while tripping drfil with all parties.Cont.circ.tubing volume CO? 2 bpm 1300 1330 050 13.50 W.O. L 5 P RID Circ.Equip and blow down lines. 13:30 17.30 4.00 17.50 W.O. L 4 P Cont.POOH L/D 4.5"Tubing 0 11.062'-7842',130k puw.fill w/double displacement end 10 bph. 1730 19:00 1.50 19.00 W.O. L 9 P PJSM Pump 125 bbls of 10.5 ppg bane down tubing @ 7842',2 bpm.1000 psi.Sim-Ope;CIO spools in spooling unit. 1900 19:30 0.50 19.50 W.O. L 20 P PJSM B/D and RID circulating lines. 19:30 20:30 1 00 20.50 W.O. L 25 TS99 PJSM Troubleshoot camera failure.Run new cable. 2030 OD.00 3 50 24.00 W.O. L 4 P Cont POOH F/7842'to 4765'MD laying down 4.5"12.68 L-80 Hyd 563 Tbg,fill double displacement every 10 jnts end10 bbls in IA every hour,L/D 155 jnts,155 full clamps.1 splice clamp,P/U 120K,Cal.disp=28.8 bbls,actual displacement=85.17 bbls,pumped 86.6 5515 down IA.pumped 247 bbls tbg volume,total for tour 399 bbls.RN circ equipment(Total pump tor 24 hours no returns 649 bbls 10.58 Brine) Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Diming Suimu 907.685-0715 Eni representative Russ Wimmer ENI Diming Sups. SIDDrilling@empetroleuru corn 907-685-0715 907-320-0058 Eni representative Mitch Billington ENI Sq Clerk akrrgclerksdoyon15@empetroleum.corn 907-685-0722 Eni representative Troy England ENI HSE. Tool Push Justin Hays Doyon Drilling Tool Pusn Tool Push Jerry Hansen Doyon Onlling I ool Push Last Casing Seat Can.Type OD(In) ID tin) Grade Top(ftKB) Bottom(ftKB) TVD Bot.(ftKB) Run Date LINER 51/2 L80 16,362.0 24.615.0 3,568.2 9/13/2015 • • Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/22/2017 aReport#: 6 en IIn Job: WORKOVER Page:1 of 1 Well Header Permit/Concession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 54.13 13 09 1 1 53 36.50 32.74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature("F) Wind Days LTI(days) Days RI(days) -POB Clear -3.5 S @ 6 MPH WC-11' 39 00 39.00 85.0 Daily Summary Operations 24h Forecast Cant M/U ESP assembly,splice cable test cap tube as per procedure,RIH WI ESP assembly on 4 1/2"12.6#LOU: Hyd 563 tubing as per tally 24h Summary POOH W/ESP completion string F/5.132'MD performing hole fill displacement procedures L/D ESP assembly and shroud,R/U to RIH,pull ESP cable 8 Cap lines thru sheaves,M/U shroud.P/U Motor assembly and fill WI oil.install ESP cable and cap tube. Operation at 07.00 Performing ESP cable Spice Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 0000 01.00 I.00 1.00 W.O. L 7 P PJSM,R/U to Circ.tubing volume @ 5,132'MD.pump 78 bbls @ 2 bpm,1475 psi. 01:00 01.30 0.50 1.50 W 0 L 4 P Cont to POOH F/5,132'to 4.683'MD 01 30 02:00 0.50 2 00 W 0 L 25 TS99 Work on spooler unit. 02:00 03:30 1.50 3.50 W.O. L 4 P Cont POOH WI 4.5"ESP completion string F/4,683'to 2,132'MD 03:30 04.00 0 50 4.00 W.0 L 7 P Circ tubing volume @ 2,132'MD,pump 32 bbls @ 2 bpm.1.285 psi. 04.00 06.30 2.50 6.50 W.O. L 4 P Cont POOH W/4.5"completion string F/2,132'M 104'MD 06.30 09.30 3 00 9.50 W.O. L 4 P PJSM,LID ESP pump.motor&shroud. 09:30 12.00 2.50 12.00 W.O. L 4 P PJSM,Clear rig floor of all pulling equipment,remove ESP cable and cap lines from sheaves,remove ESP trunk and 2"dram hose,fill hole double metal displacement 42 bbls pumped,110 bbls down tubing.hourly fill 92 bbls(total losses for tour 244 bbls) 12:00 -16.00 6.00 18.00 W.O. K 1 P PJSM.mobilize baker equipment to rig floor&pipe shed.All hole W/10 bbls 70.5 ppg brine every hour,MID Volant tool,CIO spool in spooler unit,R/U GBR double stack tongs. 18'.00 19,00 1.00 19.00 W.O. K 1 P Pull ESP cable and capillary line thm sheaves in derrick,P/U ESP basket. j. 19.00 19:30 0.50 19.50 W.O. K 1 P PJSM,W/rig crew.GBR,Baker reps.company Rep,review well control WI shroud and ESP motor in hole. 4-k 19.30 20:00 050 20.00 W.0. K 20 P M/U 7"shroud RIH. V 1(Tel 20:00 23:00 3.00 23.00 W.O. K 20 P M/U ESP motor assembly fill with CL-5E oil. t 23:00 00:00 1.00 24.00 W.O. K 5 P Install Capillary&ESP line to ESP motor assembly. Total fill to hole for tour 132.8 bbls.(Total losses for the day 376.8) Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drying Supv. 907-685-0715 Eni representative Russ Wlmmer ENI Drilling Sup. SIDOrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Mitch Billington ENI Rig Clerk akrigclerksdoyenl5@empetroleum com 907-685-0722 Eni representative Troy England ENI HSE Tool Push Justin Hays Doyon Drilling Tool Push Tool Push Jerry Hansen Doyon Drilling Tool Push Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(RKB) TVD Bot.(RKB) Run Date LINER 51/2 L-80 18.362.0 24,6150 3,568.2 9/13/2015 • • Tr-Lost Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Date:Well Code: 29881• Report#:3�017 en II Job: WORKOVER Page:1 of 1 Well Header Permit/Concession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co_Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(It) 54.1'3 13 09 10 63 36.50 32 74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) POB Overcast SSW©19 MPH WC-13' 40 00 40.00 67.0 Daily Summary Operations 24h Forecast Cont RIH W/ESP completion string testing cap tube and ESP cable per Baker procedure.MIU hanger 8 land completion.RILDS 8 test hanger 24h Summary Cont.MU ESP assembly,make cable and cap tube splice.test cap tube as per Baker procedure,run 4 5"completion 04.724'MD.test cable 8 cap tube as per Baker procedure Operation at 07.00 RIH WI ESP Completion string(ril 6,130'MD Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 00.00 0300 300 300'WO K 4 P PJSM cont MU ESP assembly-pumps discharge head,DGU 8 centralizer 03'00 05.00 2 00 5.00 W 0 K 20 P Connect tee-wire to discharge pressure sub&secure wiclamp.MU first joint splice motor lead to ESP cable 0500 05..30 0.50 5 50 W 0 K 5 P Connect 1/4"capillary line la the 3/8"cap line. 05.30 09.00 ' 3.50' 9.00 W 0 K 12 P Initial pressure testing of chemical injection line,200.1000.2000.2500 psi fr20 min each.CV opening&pumping through @3400 psi&CV close wino bleed off @2500 psi 0900 1200 3 00 12.00 W 0 K 4 P PJSM.run 4.5"completion w/ESP 1/105'51155'fill hole w(10 bbl every hour.losses till noon 125 bbl 12:00 14:00 2 00 14.00 W 0 K 12 P Test ESP cable&cap tube.2000&2500 psi integrity test,open CV&pump test @3400 psi,close CV 1570 psi,fill hole every hour with 10 bbls 10 5 ppg brine 1490 16:30 2.50 16.50 W.0 K 4 P RIH W/ESP completion string FI 1,155'to 2,184'MO 16'30 17:30 1.00 17.50 W 0 K 12 P Test Cap tube and ESP cable as per procedure. 1730 19'30 2.00 19.50 W.O. K 4 P Cont.RIH WI ESP completion string F/2.184'to 2.989'MD,SO 110K. 19 30 20.30 1.00 20.50 W 0 K 12 P Test cap tube and ESP cable as per procedure,RIU circ equipment pump tbg volume 45 hbls @ 2 DPM 240 psi. 20:30 23 00 2.50 23.00 W.O. K 4 P Cant RIH WI ESP completion string F/2.989'to 4,038'MD.Test Cap tube and ESP cable per procedure.. 23'00 0000 1.00 24 00 W 0 K 4 P Cant RIH WI 4.5"ESP completion Ff 4,038'to 4,724'MD,SO 106K,losses for tour 150 bbls(total losses for the day 275 bbls) Daily Contacts Position Contact Name Company Title Email Me Mobile En:representative Bruce Simonson ENI Drilling Supv 907-685-0715 Ern representative Russ Wimmer ENI Drilling Supv. SIDDrilling@empetroleum.cam 907685-0715 9e%320 0057 Er,representative Mitch Billington ENI Rig Clerk akrigclerksdoyonl5@eb:petroleum.corn 907-685-0722 En:representative Troy England EN1 fISE Tool Push Justin Hays Doyen Dulling Tool Push Tool Push Jerry Hansen Doyon Drilling Tool Push Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(1tKB) Bottom(1tKB) TVD Bet.(ftKB) Run Date LINER 51/2 L-80 18,362.0 24,6150 3.568.2 91132015 • • r Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Date: 3/24/2017 • Well Code: 29881 Report#: s e n fl Job: WORKOVER Page:1 of 1 Well Header Permit/Concession N" Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 54.13 13 09 17 63 36.50 3274 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) POB Overcast 37 SSW @ 25 MPH WC-17' 41 00 41.00 68.0 Daily Summary Operations 24h Forecast Cont RIO W/ESP completion string testing cap tube and ESP cable per Baker procedure,M/U hanger 8 land completion.RILDS 8 test hanger.L/D landing jnt RID BOP's N/U tree and test void RU lubricator pull BPV install TWC and test Tree to 5,000 PSI as per well integrety test. 24h Summary RIH W/ESP completion string F/4,724'to 12000'MD testing ESP cable and cap tube as per procedure pumping tubing volume and hole NI as per procedure SP16-FN3 IA 20 psi.Tbg 20 psi. Operation at 07.00 41 13.038'MD.testing cap tube and ESP cable as per procedure Time Log Start End Cum Our Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 0000 00:30 0.50 0.50 W.0. K 4 P Cont RIH wl4.5"completion 04724'55000' 00.30 01:30 1.00 1.50 W.O. K -12 P Test ESP cable&integnty test cap lube 1/800 psi 1/20 min 0130 02:30 1.00 2.50 W.O. K 4 P RIH w/4.5"completion 85000'116000' 0230 03:30 1.00 3.50 W.O. K 12 P Test ESP cable&integrity test cap tube 11800 psi f/20 min,pump 91 bbl 10.5 ppg bnne down tubing 0 2 bpm 390 psi 03:30 05:00 1 50 5.00 W.O. K 4 P RIH w/4.5"completion 116000'117059' 0500 09'00 4.00 9.00 W 0 K 12 P Test ESP cable&cap tube.2000&2500 psi integrity test.open CV 03400 psi,close CV 1570 psi,C/O ESP cable spool. attach ESP line to new spool. 0990 09'30 0.50 9.50 W.O. K 4 P Cont.RIH w/4.5"completion V7390' 09:30 11:30 2.00 11.50 W.O. K 20 P Splice ESP cable and test same. 11:30 12:30 1.00 12.50 W.0. K 4 P RIH WI completion F/7390'to 8000'MD. 12:30 13:30 1.00 13.50 W.O. K 12 P Test ESP cable&integnty test cap tube 11800 psi 1/20 min. 13:30 14:30 1.00 14.50 W.O. K 4 P RIH WI ESP completion to 905e.MD.Filling hole 10 bbls every hour.SO 100K 14:30 1690 1.50' 16.00 W.O. K 12 P R/U Circ equip.pump tbg volume 137 bbls 0 2 BPM 350 psi.situps test ESP&cap tube per procedure.R/D B/D test equipment. 16:00 18:00 2.00 18.00 W.O. K 4 P Cont RIH W/ESP completion Fl 9058'to 10,036'MD.SO 97K 18.00 19:00 1.00 19 00 W O. K 12 P Test ESP cable and Cap tube per procedure. 19.00 2030 1.50 20.50 W 0 K 4 P Cont RIH F/10.036'to 11,020'MD.SO 96K 20.30 21:00 0.50 21.00 W.O. K 12 P Test ESP cable&Cap tube as per procedure 21 00 00:00 3.00 24.00'W.O. K 4 P Cont RIH P/11,020'to 12,000'MD adding 10 bbls per hour. Losses for tour 115 bola(Total losses for the day 228 bbls) Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Witmer ENI Drilling Supv. SIDDrilling0enipetroleum.cern 907-685-0715 907-320-0056 Eni representative Mitch Billington ENI Rig Clerk akngclerksdoyonl5@enipetroleum.corn 907-685-0722 Eni representative Troy England ENI HSE Tool Push Justin Hays Doyon Drilling Tool Push Tool Push Dave Sena Doyon Drilling tour Pusher Tool Push Sam Dye Doyon Drilling Superintendent Last Casing Seat Cas.Type OD(In) ID(In) Grade Top(ftKB) Bottom(RKB) TVD Bot.(ftKB) Run Date LINER 51/2 L-80 16.3620 246150 3,5682 9/13/2015 • 0 Iiiiiiiit Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/25/2017 •e n o Job: WORKOVER Report 1 of Page:1 1 1 Well Header Permit/Concession N° Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Leval(tt) First Flange(R) RKB-Base Flange(R) RKB-Tubing Spool(R) 54.13 13 09 17 63 36.50 32.74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOVON LAND RIG 0723 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) P00 Clear 1.7 SSW @ 17 MPH WC-19 42 00 42.00 64.0 Daily Summary Operations 24h Forecast Cont NW tree.pull BPV&install test plug.Test tree 5000 psi.test tubing hanger void I peckoff to 5,000 psi F/10 min..perform pressure test of gate valve as per Well Integ0ty Procedure Pull test plug.perform Oriel ESP cable I motor integrity tests.Shut in well,finish cleaning pits and get ready to move.RDMO to SP16-FN3 24h Summary Tont.RIH w14.5"completion 1/12000'614049'test ESP cable and cap tube integrity every 1000',pump tubing volume every 3000'add 10bbl per hour down IA.,perform cap tube full testes per Baker procedure before cutting line espool,MU hanger,make penetrator&cap tube splice to hanger,test cap tube as per Baker Land hanger,RILDS,tset hanger.RID equipment,NiD POPE N/U tree. Operation at 07,00 Testing Tree Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Aut. Plan Oper.Descr. 00.00 01:00 1.00 1.00 W 0. K 12 P Test ESP cable&cap tube integnty test 1/800 psi f/20 min 01.00 03.30 2.50 3.50 W.O. K 4 P RIH wl4.5"completion 1/12000'013000' 03:30 04:30 1 00 4.50 W.O. K 12 P Test ESP cable&cap tube mtegnty test 1(800 psi 1120 min 04:30 0630 2 00 6 50 W 0 K 4 P RIH w/4.5"completion f/13000'014049' 06:30 1000 350 1000 W 0 K 12 P Test ESP cable and full cap tube test.500.1000.&1500 psi integrity test f/20 min each.check valve open and pump through test @3200 psi,check valve bleed down and close @ 2000 psi 1000 12:00 2 00 12.00 W.O. K 20 P MU 60,tubing hanger&landing joint.orient hanger per Vetco.install penetratormake penetrator spice,and cap tube connection. 1200 15.30 3.50 15 50 W 0 K 12 P PJSM.Spice ESP cable and cap tube per baker rep 15:30 17:00 I 50 17 00 W 0 K 4 P PiU 160K,SO 90K land hanger.RILDS.test hanger seals to 5,000 psi F1 10 min. 1700 17.30 0.50 17.50 W.O. K 20 P LID Volant tool.LID landing jet,clear rig floor,set BPV. 17:30 16:00 0.50 18.00 W.O. K 20 P Lit)ESP cable&cap tube,LD ESP container. 18.00 20.00 200 20.00 WO. K 20 P PJSM NiD ROPE&riser 20.00 23.30 3.50 23.50 W 0 K 20 P RAJ Baker cap tube line&test cap ins tube per Baker Centrilih reps proceduresimops prep ng Fi move.clean pits,RID HP mud line.mud pumps 2330 0000 0 50 24 00 W 0 K 20 P P.ISM dress well head&N/U tree Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-665-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum com 907-685-0715 907-320.0058 Eni representative Mitch Billington ENI Rig Clerk akngclerksdoyon15@enipetroleum.com 907-685-0722 Eni representative Troy England ENI HSE Tool Push Sam Dye Doyen Drilling Superintendent Tool Push Justin Hays Doyon Dnlling Tool Push Tool Push Dave Sena Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(RKB) TVD Bot.(ftKB) Run Date LINER 51/2 L-80 16,362.0 24,6150 3.5682 9/132015 r 0 0 Well Name: SP28-NW3 OR Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 3/26/2017 • Report#: 10 2n fi Job: WORKOVER Page:1 of 1 Well Header Permit/Concession N. Operator Subsidiary Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL Rotary Table Elevation(ft) Ground Level(ft) First Flange(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft) 54.13 13 09 17 63 36 50 32.74 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI(days) FOB Partly Cloudy -3 2 SW @ 17 MPH WC-19- 43.00 43 00 63.0 Daily Summary Operations 2dh Forecast Prep to move rig,move rig over SP16-FN3 This is last workover report for SP26-NW3 24h Summery Dress tree.NIU tree test void.RID HP tines Tbg 8 IA.pull BPV,install TWC,work on test pumpfluid pack tree I test tree and chart.Pull TWC,RID tiger tank.prep to skid floor. Operation at 07.00 Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 00.00 01-30 1 50 1 50 W 0 K 12 P Cont dressing tree.NU tree,test void t/5000 psi 610 min 01'30 03:00 1 50 3.00 W 0 K 20 P RD HI PSI lines on tubing 8 IA,pull BPV,install TrA/C,RU to fill tree wldiesel,unable to fill tree w/diesel due to test pump failure. 0300 05.00 2.00 5.00 W.O. K 2.5 TS03 Work on test pump. 05.00 09:00 4.00 9.00 W.O. K 12 P Fluid pack tree wldiesel,test tree to 500/5000 LO/HI 115/10 min.test swab valve t/500/200073000 55/5/30 min,test wing valve 65001200013000 1/5/5130 min.All tests charted)BD steam brig floor,clean pits,prep sub f/skidding rig floor) 09.00 10:00 1 00 10.00 W.O. K 20 P Pull TWC,dress tree,clean up in well bay(disconnect air&steam lines Prig floor,BD water system) 10:00 11.00 1 00 11 00 w A 1 P RD tiger tank.&move same.cut auger shutet to new length,move cuttings tank cont cleaning pits 11-00 1200 1.00 12,00 W.O. A 2 P PJSM,skid ng floor.Rig Released from Well SP28-NW3 @ 12:003/28/2017 Handover to Production completed. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson 'ENI Ordling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrllling@empetroleum.com 907-685-0715 90--320-0000 Eni representative Mitch Billington EN) Rig Clerk akrigclerksdoyon15@enlpetroleum corn 907-685-0722 Eni representative Troy England ENI HSE Tool Push Sam Dye Doyon Drilling Superintendent Tool Push Justin Hays Doyon Drilling Tool Push Tool Push Dave Sena Doyon Drilling Tour Pusher Last Casing Seat Can.Type OD(in) ID(in) Grade Top(kKB) Bottom(ftKB) TVD Bet.(kKB) Run Date LINER 5 10 L-80 16.362 0 24.615 0 3.568.2 9/13/2015 • • VOF , 4,1.„iy7,-8. THE STATE Alaska Oil and Gas �\ ,' h�„„-t.� � of /� LA S1A Conservation Commission T- k 333 West Seventh Avenue C Anchorage, Alaska 99501-3572 " ', GOVERNOR BILL WALKER g ,.�, Main: 907.279.1433 OF A. ge' Fax: 907.276.7542 www.aogcc.alaska.gov Marc Kuck Drilling and Completion Engineering Manager NE® A Eni US Operating Co. Inc. s`AN 3800 Centerpoint Dr., Ste. 300 Anchorage,AK 99503 Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP28-NW3 Permit to Drill Number: 215-134 Sundry Number: 317-039 Dear Mr. Kuck: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 41-61. Cathy P Foerster Chair DATED this I 5 day of February, 2017. RDDIV1S 1c-' FEB - 3 2017 STATE OF ALASKA• • RECEIVED • ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 4 2017 APPLICATION FOR SUNDRY APPROVALS ( (` 7 20 AAC 25.280 1.Type of Request: Abandon 9 Plug Perforations 9 Fracture Stimulate 9 Repair Well 9 • Aerations shutdown 9 Suspend 9 Perforate 9 Other Stimulate 9 Pull Tubing 2 • Change Approved Program 9 Plug for Redrill 9 Perforate New Pool 9 Re-enter Susp Well 9 Alter Casing 9 Other: ESP Chance-out P1 • 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. Eni US Operating Co.Inc. Exploratory 9 Development 9, 215-134 3.Address: Stratigraphic 9 Service El 6.API Number. 3800 Centerpoint Drive,Ste.300,Anchorage,AK 99503 50-629-23556-00-00 , 7.If perforating: 8.Well Name and Number What Regulation or Conservation Order governs well spacing in this pool? N/A SP28-NVV3 • Will planned perforations require a spacing exception? Yes 9 No 9 J 9.Property Designation(Lease Number): 10.Field/Pool(s): 0388572, 0388574, 0388575, 0388583, 391283 • Nikaitchuq Schrader Bluff Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 24,615 ' 3,568 „ 24,615 . 3,568 . 811 N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor 160 20" 160 160 Surface 2788 13.375" 2788 2452 5210 2480 Intermediate 16552 9.625" 16552 3615 6890 4790 Production Liner 8063 5.5" 24615 3568 slotted slotted Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(tt): 16,552-24,615 • 3,615-3,568 4.5" L80 14000 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): N/A N/A 12.Attachments: Proposal Summary ❑✓ Wellbore schematic 9 13.Well Class after proposed work: Detailed Operations Program 9 BOP Sketch 9 Exploratory 9 Stratigraphic 9 Development 9. Service 9 14.Estimated Date for 4/4/2017 15.Well Status after proposed work: Commencing Operations: OIL 9 . WINJ 9 WDSPL ❑ Suspended 0 16.Verbal Approval: Date: GAS 9 WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ 9 Op Shutdown 9 Abandoned 9 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Amjad Chaudhry Email amjad.chaudhry@enipetroleum.com Printed Name Marc Kuck Title Drilling&Completion Engineering manager Signature Phone 907-865-3322 Date 1/23/2017 iA./ COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. Plug Integrity 9BOP Test Mechanical Integrity Test 9 Location Clearance ❑ •44SF i t, 144Other: XJ;00 CSS i v:::,0? o Post Initial Injection MIT Req'd? Yes 0 No 0 j Spacing Exception Required? Yes 9 No ' Subsequent Form Required: t 0 --404,. RBD S 1,1-- FLS - 3 2017 APPROVED BY Approved by: 44-44"/ COMMISSIONER THE COMMISSION Date: 2_.,I (7 Submit Firm and Form 10-40 ev ed 11/2015 p v n�s valid for 12 Mont fr m the date of approval. Attachments in Duplicate req. 11 i 0 R �' `� L N► t ill/ id i e 0s/., • • ft,* • .11. RECEIVED • Enii L tiroHeuinn env JAN 2 4 2017 AOGGC 3800 Centerpoint Drive Suite 300 Anchorage,Alaska 99503 Marc Kuck Phone(907)865-3322 Email: marc.kuck@enipetroleum.com January 23rd ,2017 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 RE: Application for Sundry Approval for SP28-NW3 Rig Workover Dear Commissioners, ENI US Operating Co. Inc.hereby applies for a Workover Sundry for well SP28-NW3. SP28-NW3 was completed on Spy Island on October 15th, 2015 with a conventional electric submersible pump set at a depth of 14,089' MD. This ESP producer was completed without a packer. The well was started up for production in October 2015. On December 10th, 2016 an ESP failure was occurred. / The estimated date for beginning this work is April 4th,2017. Please find attached for the review of the Commission forms 10-403 and supporting documentation. If you have any questions or require further information, please contact Amjad Chaudhry at 907- 865-3379. Sincerely, / 6/2.- 77 AV Marc Kuck Well Operations Project Manager ID • SP28-NW3 Workover— Summary Page PTD#:215-134 Current Status Well SP28-NW3 is currently down due a ESP failure. Scope of Work Scope of this workover is change ESP pump. General Well info Reservoir Pressure/TVD: This well is expected to have a static max bottom hole pressure of approximately 1170 psi (3,591' TVD) during the time of workover, which places the fluid level well below surface. Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi BOP configuration: Annular/pipe/blind rams/Mudcross/pipe TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not performed. Intermediate csg 9 5/8" was tested prior to drill out on August 2015. Well type: Producer Estimated start date: April 4th 2017 Drilling rig: Doyon 15 Completion Engineer: Amjad Chaudhry: amj ad.chaudhry(a,enipetro leum.com Work: 907-865-3379 • • Procedure: 1. MIRU Doyon 15. 2. Shear upper GLM valve and pump in bullheading 8.6 ppg KC1 brine through tree. Pump in bullheading 8.6 ppg KC1 brine in IA. Ensure well is killed. 3. Set BPV. ND tree and NU BOP and test to 3500 psi. ,‘/ 4. Pull tubing to upper GLM. 5. Shear lower GLM valve and pump in bullheading 8.6 ppg KC1 brine. 6. Pull tubing to lower GLM. Rig up wireline and pull tubing stop check valve. 7. Circulate out remaining production fluid. 8. Continue POOH and lay down ESP assembly. 9. MU new ESP assembly and RIH to setting depth. 10. Land hanger, and test it. 11. Install BPV and nipple down BOP. 12. NU tubing adapter and tree. 13. Pull BPV, install test plug and test tree. 14. Circulate Freeze protect through tree down IA. 15. Shut in well. 16. RDMO. Below the current schematic of the well: 4-W 12.6 ppf Production Tubing --T I 2,232'MD,2,069'TVD 40°Inc-GLM,KBMG, 4-W x 1",with 2,000 psi STS-1 soy installed 10* eno ipi4-W x-cplg cable damps,for ESP Power t,ou:t6 c 11111 I) ' Cable,(1)3/8"Chem Inj Line with 2500 SP28-NW3 psi check valve at bottom 13,894'MD,3,298'TVD 79°Inc-GLM,KBMG, 4-%a"x 1",with Dual Lateral Producer 3,100 psi STS-1 Soy installed with ESP Lift ,.- 14.003'MD,3,317'TVD-Discharge Gauge Sub As Completed lk 14,089'MD.3,334'TVD.79°Inc-Bottom of Motor Centralizer Centrilift,ESP,57 stage `� Flex 31 SXD+57 stage Flex 31 SXD pump+20 stage GINSPHH SXD,513 GSB3 10-15-2015 seals,240 HP 562MSP3 motor.gas separator •`. 14.132'MD 3,342'TVD-234 Shroud Assembly with cable and chemical Surf.Casing --/j,,. injection line feed-thrus.3.5"perforated gas dispersion tube 13-3/8".68 4 / ' 4 W'Lateral Entry 2,788'MD, Module(LEM)wl 3.68 Silver Buffet Ecc.Nose 2,452'TVD Seal Bore 5-1/2"75.5/77 pp f Guide Closed Shoe TD 8 3/4" 55°Inc. 23,156'MD,3,584'TVD. 23,200'MD, , 16,318'-16,363'MD. L80 Slotted Liner 80°Inc. 3,584'TVD 3,598-3,601'TVD 90°Inc. 16,221'MD,3,591 TVD � Casing Exit Window -L1 -Baker SLXP Liner v _ -_ _ _- _- -� � - - Hanger/Packer � ', 16.307'MD RAM Hanger -. - _- 5.960"Lateral Drift ID 3.688"Mainbore Drift ID .� .., _ _. 4-W x 9-5/8""AM -, HAL 5-a pit Swell TO 8 3/4" Seal Bore Dlverter - ';F�`� Sealbore Receptacle packet 24.986'MD. \:. 3.552'TVD 93°Inc. Iso Pkrs MDIn) w!3.88"$eel BOfe Vf 4.7i"ID N1 24,591 -_._82 24,508 18,362'MD,3,601'TVD �- . ,.� ' * s 3:0�14.}. #3 24,385 Baker MLXP Liner . _ 84 24,221 Hanger/Packer 41111. =En 05 24,181 _ �. . .�, _ .�".,�__ 08 23,126 Bottom of Seal 4� _ i 1S`Bieck_iyikTik 07 20,910 Assembly , . 15.5 ppf L80 Blank Liner Interm.Casing OM 18,923 9-5/8",400 18,410-18,984'MD, Silver Bullet Ecc.Nose Guide Shoe #9 19,430 16,552'MD.3,615'TVD 20,859-21,050'MD, 24,181'-24,591 MD 24,815'MD,3,568'TVD,93°Inc. Nikaitcluq Field-Spy Island 87°Inc. Water Zone Coverage VetcoGray MB-247 SURFACE COMPLETION SYSTEM r--- -63.50 �MNN/CL ---1 SS 37.19 u ii1108111. ,.,....,.„..--niTille —"'a= _ a .e.„,,,, on„..741 ... istt- fi F.J.Ile 1 ;Irv, tild::2-, ......1r.: , Lf....1....8,, ! gr -.1� ,' �� T.O.S. EL 26' 5-3/4" ■ .062 OFFSET CA1 B.O.S. EL 25' 7-1/4" ra,TOP OF WELLHEAD 5.00" EL 25' 2-1/4" 1 ) . ( 01 0 A°iC ELECTRICAL PFT FEE0IHRU 21.81 11/4 jriali i NM 13-5/8.5000 PSI VG S137 CLAMP ��6� 4_1/18 - II? " El -:::� �• 5000 PSI 1� �I __ „ ,......,... E' I J_ _._ !:f!Ii1i!JiI437 3. OFFSET 108.0 PI m "1" 6.50 1+'i 2-1 16' II -1/16_l D•7.�}; :__ 1� __it_ SDDO PSI 66.71 OUT OF PosmoN o, 1a"5000 PSI 52.96" - .I��•1I 6 In VG 134 MOO. 26.5• A•-i _ �a.�}.r I_ 34.00- ... _1 ;_.1._ t PSI: � OUT OF 24.24 ! C - -4 j15.25" POSRION .F1 ,I I V TOP OF GRADING 1 1i of I EL 1670-1-1/4" L1.00 PROPRIETARY No11ca tet 4.2.w veleogray- 20" OD 13.3k K-55 �s�` •..■rw... 13-3/8"OD 56/ L-80 11111611 v.Auo ENI ALASKA 9-5/8" OD 53.5# L-80 Lit rale.. HORIZONTAL MULTI-BOWL SYSTEM 4-1/2" OD WITH 6-5/B VIT �I TOMO 20 X 13-3/8 X 9-5/8 X E.a k 4-1/2 WITH 6-5/8 VII .....m AND ESP FLAT CABLE 23 Ares oe (1).Q Tom H173370-1 /�,' .o.aw .• a. , co.. . co. v cXXXI .5 1 X 1a . , vl PRP/ 10161, NC 10 OF 10 23 JANUARY 2.009 i �. \ GE imagination a-.work 0 • el fnG: - O 5 N �� g NZ O m Q O C9 YY1n V K @S [ cn re wj 'El- ,:.0.. O O i „(:). b Oi g w d ' o m¢6 W 0- Y O O 7 O ¢6F m Y O m m I Q o_ 0 i . N 17 * N O N d _, H m 0 1 B E02' I!; j i UJ LA_ E o a C\ F N MO N J Z co � w d o0vw x §It �~ '1 6c5.1 - < wZ -64 E i=in. 8,,:, ,K §,,,,- :._. mt, v _ yoz u .. ,,_ i_. „ ,-,) _0 a- _, j 11 : ,( ¢m a J u_ �_ z P W •sus �� —DM) - n, o i _ � i ,. 1 ',._------1 it- == -I—Z k 1 V ! � W NV■per I Ty ni i ” -- el 11=111--- . II .B/S S RI i i Q i U_ 1 • ID IS g6 $g# G Y nm OW 2E• NNNNNN NNNNNN �O 0.-O.-O - -- t0.-v)0001t)O,00000NO X) n Cly Y M7 d N M 06 NN 03COMO)00,-mNNMMd-,1-0 )�O as r N 000OO?O)00.-s-NNMMd NrInv) op. 25, rc I7 .0. [O[O ai[OIO[O,66,ci O[OtOaONNN hNNNNNNNNNA NNrr NNNaONON00000606060000 O gen . O b ¢ GyQ Y �0 S E as E e . m .-NMa mr-m rn '-NMd• I r-mm -NMd-�ION W O) ,-NMd' mr-m ) �-NM N,_MM M M pj M M M Me_ `4-,:i. yea 7a,_000 N N 010 N 0 e_O 00 O 0$OIO CO 0,_NNN ryN DEp1 M7,17 - G o2 37 h 542 a2 Hr N CO• 0 0 m 0 g 2 E NOu)ONO nomm W a O)m 01 moo--NNn W a.M00MOOM W M00 mM00MNNNN U T 8 N .-NNMM�4�v)��<ONNDO 0Oa0)00�-�NNMMQa'v)u)�O tON N o00020?00 -NNM -;8 taa 444444vaaaaa44444466L6uilrilri66,6lnln66dividividio666,66666 o L 0 w n a 3 0 E Q o S d•mor-mm NMav)ION000) N M 7 IO N N 01 N M O N DO O) N M d v)tO N N . 5 0 D O O O 0 0 0 0 0 0— N N N N N N N N m j W 00 W 00 DO 00�O)O)0>O>O)O)010101� g, gY a N N a 0 1.1 cl I _ _,_ _ _,,_ ___.7 Ay A___T\72\7__ -—- J,� `'"A --. a r V I O Z! i 0 • ',7‘. U.. • O O N 3 a • 3 J O Aft iz O 0 ) Q 1411,1 w J- W- II (n D CO Q i • A t > _ 6J &Ilk AM ASP' iii 6 tiO 20 C" um in as ' V 0 2 c5 0. H N 001.6 44 - VP 40 AVik- -- - gliklii, fAO 11 AM& #1.." 0 efpNVVIIP e''''' V-4C Walk 4„,,‘i V ‘11111" Ilikililkil ' illi , a1:10 a D J op taimniore o doli, IP 4.010P- l' ' A 0 ri 'V ..... :r iy > a a CO es .— c:. > 03 > IV) > us (n p p c� R °' R > c c3 a> > nUJ I , E � y = l Z � o a) 3 Q G V Q 2 V N (C = ToN N V K! .- , Ce 0 a 7 e CI '� O O W � 2 oo ooco W � Z ix 0 L_ - 'Q 7 7 ,- 4 J cC Q M M N 4 2 E 4,4 t=:.. Et EF3) c' W Q o o) t° °° co ,d in .- • • i J0 b To 00 M it y0 O O 0 W NrmrW O Om mN O 0oWoN ON n co A OcoM r r d �/' O U f-L� i ‘,...-... ( LL f VI 2 04 '�U < NcMWOV O 0 CO1p rQ et O O O rN .- In ( C) N CO NT N 0 M =I d'd 1 al W (r W E /�-�, U ll C ZC y M0 a O NON ANOM N p5 NN O� Vmh W4- ONmmNWOmmmAm NO m 10mcO N a N N .y CO N 0 ) N UN f7 F-) M , V M Y V ®C 2 VI a O m W c m W W O W m m m ^ W A A m m W N A T W CO ^ N W N W A d Q d N r r r r E C 00 to CD O CO S W O N c 01 o r0 0 0m NW0rNNWm M a m O W A N O0 AN N0 A 7D Oy ► y N 0 Fi PO N A 8 V O ^ m N q O2 o AN AN N N meA M M N N C Z O 2 a m O CD O LLC co 0 mnn 01 CO n CO n O VI 0 mnm NryNyN T A C) A N U) m n n n n coo n CO -O. E 0H E o U U CL r d cZ O - Oa o 2 co c c ' C < N N N N r N N N N N N 0 M M M 0 N N Ar r r N N N N N CQ 5r w N 2 Q }- N m O U iii cc _ti LL Z J Ufi, N m O W m N M .t d 0 W O m N O M M V co O N A O m co M c 0 0 —I Q y W W W W m W W W A m W < N CO n co v < M M N 0 m M CO t < M0 d <( O. N N N N N N N N N N N N 0104010101N = F-co N ai 0 //¢I�f ...1 y y V _d W Q Z Q N 1 N 0 .EcoonNW ^ W 0 CO r CO N N `M-' M N N � N N m N N N N N A m ' t V N N 5 O c o, cr M Acom Or N A M m 2A m m pr O A NN Oa OOW K t34.) mM N m h N m N WN N mm M N N ] N 7 N N N co N N N N N M CU) FQ 3 Q d i d El N NN r r r r r CC m m mmmmmm0 m m m m m mm O NN . NNoNANW jN ' ' NNNNNN NM ' ' N m N (r r NLO VL V £ do to CD O ' a I; Lc 2 x d _' N N m m N m m m m m N m m m to m m m IC) m m m m N h N m h m f0 m d 4 _ LL Z •d H SIN N .co d C.,)1\ F 0 c 0 0 0 CD m m tO m m m 0 (o to 0 co fn to to m (o m CO to l0 ID 0 40 $d ` g al Ado 66.6d ' 6t4AAmttYtarb ' gv) u5omo' to0R 0d b O td mQd iOC ; OaAOOAtAggmVyC O O O 0O0 0Qt 0 0 0 0 00 0 0 0 0 ,_OFC 0 49 � " 4g0 088o10 0 0 0 0 i tv is tv 0 d $ 200od gd oo S g.d o2 o0 o . g m W dNdZ 8AN COmtV 04 NN4aa WghMNNNNm00 MMN N A £ cd N N N N N N N N N N N N N N N N N N N N N N N N 0Q N N N N N N W N N NNNNNNNNN N N N N N Na' N N N N N N eO O O Og6 O g0 m cocoCO 6m 6m m O m am m m mpd d d 6 d 6 d o o d dd � Hh dc0 U co to 0 0 V) 10 to in 10 m n n ) 0 0 m 0 0 00000 a0 2 co L.: E. E -cc t a E 10 L Z` ai m °) a r W O Q N O O O O O O O co O N m Z W W Z A m M CO _ z `o Ti, Z z a a�y. a a i? a s fn a s h t? LL Z uZ cu, LL z z LL z co z Z 3 ' ' ig y g' d PI CD E m o b o 0 o d ") us r 0 W o g o d N US n 0 4 n m ,,� ,� a z w` 3 a a a a a a a a 0 a Cl.. a ,Nd L L 000 0 0 000 0 0 000 ay CO CO ai (0 W CO CO CO N IT CO y CO CO y y Q c a ! ! MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission +(4' TO: Jim Regg \� 11 DATE: 12/29/2015 P. I. Supervisor FROM: Johnnie Hill SUBJECT: No Flow Test Petroleum Inspector Nikaitchuq SP28-NW3 ENI US Operating CO INC PTD 2151340 12/29/2015: I arrived at Nikaitchuq Spy Island Drillsite and was met by the Drillsite Lead. We talked about the well and the procedure they had written up for the no-flow. We went out and looked at how the well was rigged up. I observed that the no-flow test equipment was configured with a 3/4-inch ball valve coming off the swab valve to a 3/-inch high pressure hose, a calibrated digital gauge, a 3/-inch ball valve, followed by the flow meter; the no- flow test line terminated in a water-filled bucket downstream of the flow meter outlet. The following table shows test details: Time Pressures' Flow Rate Remarks (psi) Gas - scf/hr Liquid - gal/hr 940 0/0/110 0 none well closed 1010 1/0/110 0 none well closed 1040 1/0/110 500 scfh none well open; pressure bled to zero in 20sec 1110 0/1/110 0 none open/little gas 1140 0/1/110 0 none open/little gas 1210 0/1/110 0 none open/little gas 1240 0/1/110 0 none open/little gas 1 Pressures are T/IA/OA Summary: There was a slight, un-measurable flow of gas at the end of the flow monitoring period. The test went very well with no issues. Nikaitchuq SP28-NW3 exhibits the characteristics required for an approved no-flow test. Attachments: Photo (3) SCANNED SEP 2 12016, 2015-1229_No-Flow_Nikaitchuq_SP28-NW 3,jh.docx Page 1 of 3 r 0 No-Flow Test— Nikaitchuq SP28-NW3 (PTD 2151340) Photos by AOGCC Inspector J. Hill 12/29/2015 ,1 Jir. a No-Flow Test equipment .• setup r .., Il f ., .‘„,,,,,i 5(1-62 4440' ► El, SEC 1 . �� Digital pressure gauge to Dri I E 45 , _ Uv i 2 III 2015-1229 No-Flow_Nikaitchu SP28-NW3 'h.docx _ �L �1 Page 2 of 3 • • Armor-Flo y(sB ODE'i (`. SERIAL TAG ;spy, 1 '1'A e+ .... 240-1S 121001 f I s5` PRESSURE Ill VISCOSITY I0'sb DP1 L..„'t MAX lilt-C ) I - ,, TEN'PIHATUHE I SG�w xriPtR ,U OP [+.;:'r MAXI i .00 ERnco• EVANSTON.ILLINOIS 60202 USP . : 1!f 1 . . ' \\\\\\\ \ \ .; // S' to SCFH x100 Flow meter 2015-1229_No-Flow_Nikaitchuq_SP28-NW3 jh.docx Page 3 of 3 • 0 o O ,S . (7 N O o Ico co ._ ) O a 7O O T T N to Z ccic N �I N Lo CO c 1 O— a ,_ a (n (� O N —co 0 ml CD co N o —I v co �I 01 j 0I j To c > 6 @ d�I d I N 2 21 HI 2I HI it it ^o in �� co co cr o 2 g a d z o T — I Q a) .- a) cn co H J U V Q Q Z j m y E�I Z Z �1 �1 �I �I M M d H E. 1' C C Q. m Q' a) N N Ln Cn to Q Co i LL(l) r NI �I a)I NI a)I a)1 a)I a)I Z Z 0 C CO a) U oo a) cO V c0 ob .V cO V 00 U c6 V c6 W D O - 07 N@ N Z N N Z N Z N Z N Z N N = J ..V O (4 CO (n N 0_ , d a) d , 0_ y d a) 0_ a) d a) a. d a) E U) (/)(n �_ (0 co (0co (0 co u)U) u) U) H 0 c y coo— eco w 1 I I I O 1! o c @Z (oZ 2Z 2Z 2Z� 32Z (2Z 92Z �Z ai ) . d 0 0 0 0 (L 0 it O ii O a it O ii 0 it O it O it IL d E )(n N U(n V U)N U n U(n(D U n 55 ) /) 0(n-p )() ) CZ�@Z (n p, o> mp> o> 1 o > o> rn o> 4 0> o> c- o_ p p v W ca) 1co I (o 1v I o I(fl M 0 rco J •-•too co Uco co co UMN UMcp co UMco co U U Q v '''C' a)�c0 a)2 a) 0, a) � a) I a> cz a)� co a, a) � a) a) Lo W Ce C' E W Z N W Z W Z N W Z W Z O W Z N W Z W Z N W Z W W N= • N 1 O` O z in Lu to (0 (0 to to (0 (f) co OM as 0) 0 0 0 0 0 0 0 0 0 0 0 Y > N N N N N N N N N N N @ r r O @ � o 0 0 0 0 0 0 0 0� 0 0 Ce a LU 'o I o '�J o V Z r Q � _ o c.o. o G) 3 �" @ V) gi Tr N J O. @ �J O CD C O c G N O .@+ to v) CO 0 0 m 0 On a) V N 0M M U @ c o In — re z 0 Zcob • ii @ ab N N COco To Z Cl) HI a) W ) 0 Q C o W r Z Z Q O a Z E W O d U 0)o ccm E J rt U @ -o 0 (I) Z 7 = g 1 @ @ @ CO CO CO CO CO CO CO CO m 0 N CO CO CO @ CO CO @ CO to CO CO -0 • N E £ 0 0 0 0 0 0 0 0 0 0 0 ai Ts To Ta i In _m _E rn m _rn _rn _m a) rn _m rn o 0 0 0 0 0 0 0 0 0 0 0 J C 0 z O — - > 0 J ` - 2 CO CO CO O O (O (o CO to (O (o to M ` ., w (0a) O co co CO O (.0 O (0 O O 1.-: N a() .@„ E 1 M CO M M M M CO M M M CO M 7) Q Z t C ) (p = (o CO CO CO CO CO O CO CO CO (O CO N 2 0 0 O Wo Z N NN N N N N N N N N N W 0 1 < O Co _ u.. ZE @ E D Z re +` .8 5)LL TS O O) 1.. W U.o 0) C w N �_ Z W J � 2 O 0 0 0 0 0 0 0 0 0 0 0 0 £ 5 Q U) 0 O Q ot CO Lr2WH W W UJ W W W W W WX1 d J G H • • o oN o • o .c v O • J J • • N i O co co M M M (L "' • v Ncr) z Z Z Z Z Z aEi m m• a Q a •a _ _ • cm 2 coND N N N N N W W j a' LL W w CC LL W W 12 LL OM O .ti 6 a a a a a J 0 a 0 0 0 LL 0 O 0 a 0 0 > J p) i~ N U) U) (1) l/) U) < 0 0 0 > 0 0 0 > 0 0 0 > Z m o o ai ai ai ui ai Z F- ao m o J c H Z E E LL N N N N N N N N N N N N N 0 J C p _ (a co co co co CO M M CO CO CO CO CO CO M M M M a m rn 0 w, (1., CD aci aci as aa) @ 5 `cis D it Li. it Z Z Z Z Z Z Z Z Z Z Z Z Z ('J `m_CO 00 w 00 W 0O 00 ob 00 W 00 o0 ob 00 00 D j o)m CO > m Co a) m O m a v a s d d d d a a a a a a I ,J'p)W C J U)— (n (n (.n co (n F- U) N U) U) U) (n In N U) CO CO 0 1— - O c c O O O as m m co cu co os m m m m a0 ai a a hi a a a a a 'a aai m @ m .- 0 O) 0 co 0 0 a) 0 LL a LL it L.L LL. it LL I1 (L Il LL it it a'ct c E as V r O 7 c c vi c (ca 'c N c CO c c c c c c c c c c c c c O a' ymO 0 Cl 1�LL Z 2E O C) 2 . O 0 O_ O J O O O O O O O O O O O O M WQ >0 0 0 oa Ce a� a� a> a) > a� E a)W a) a) a) m m a) a) a) a) a) a) a) W c N W U W U CO W 2 W H W LU W LU W W LU LU W LU W LU LU N 2 LL N N N N 0 H U 1 O O O U) (n (n (n l[) (n U) U) U) (n (n (n U) (n CL o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 N N N N N N N N N N N N N N N N N (N N LU W O) O) O) o) Orn cm O) o) o) o) Orn C O) Orn O) C o) o) rn 0 W co 0,- Q., o-o.. o- C) W Q Z 8 — 1 co O) 0 co (o ICI CO O) O W a0 ICC Co . . C V O V J m 3 N N N N N a. O f6 0- �c ' • T ,O 00 a0 (0 O (O O N N N N p - O � E M V M 0 o J N N QcdM C o a. r � Z c::, O 5 N N CO a. M O aN ,M = w _I ~ co F Q / Z (o E c(6 Z u) as co co co co CO (a CO CO CO CO N (O CO CO CO CO CO N m (6 (O (a co co (O co co co (a CO CO CO CO CO CO CO CO 'O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 COLO O M CU CO CO CO CO (a CO CO CO CO CO CO CO CO CO CO CO (a 2 .0 .5 .2' .0 .2' .5) .2) .5) .5) .2' .a) .2 .2' .' .2' •5) •En .2 O o 0 D D 0 0 D D 0 0 0 0 0 0 0 0 0 0 0 0 J 2 M > O (n in in O (n in (n (n (n (n (n (n (n (n (n (n (n (n U) F co co co co co co co co co co co co co co co co co co co co T V V Tr V C V st V V V V V '7 V V b CO CO CO CO CO CO O O CO CO CO CO O CO CO CO CO CO (0 O T .N N N N N N N N N N N N N N N N N N N N N ` co G a0 o v U ", N U U U U U o U U U U U U U U U U U U U U U 0 C P.0 I0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a. 2 ,W W W W W W W LU W W LU W W W W W W W J J 40 • 0 O iI oN in O ^ iO NC�in >- >- >- kl O) _• 0 m cocn co T I -d En N p < I H Z L L O ,II F. 0 a a ■ Q m m 2 I O O 03 I U U —I III J II 9 m E Z Z hi Z o LL • 2 p it O Z 0 N :_� as W co 0. o /�/ 0. W N Z (4 rn LSI. 0 N (U O ii E W m_ c„ O) W m I Z > N o E V W O m Z — d 0 ui :? Q w o o rn _ m co a c J 0. m ? E '5 CL 0 cn c 2 0 0 t0 c °' p m o a) O S-4- et aI UN E (� M S"-.1 �`J a' o J r E M M W O Q C \J 0bh 3 V 0. I— a .E I— Z inN p cz,N N w N m = I I d v, CO m Ca i))1 0 o c I o m E E II La 7 CO m w co c rn m �/ H. E (n N U m C m D c C Q G Q C \ 2 Z o c v a) H - a Q Ci Z a lki U O E T o 0 E U 0 2 0 (U I I 1 Z 1 0) N •• LO o Min I l6 iO p 0 O 0 p V. ~ c W E O. 00 v 'Am N co ch o) W o C 1 N a-i c. m c LL 0 c u) _ > wCD iq ca ca E U 0 iit J m co C m • £ V o p fl H E O d N LLo 2 O E — m E E Q a M 3 — U ac3 0 c� c 10 0 215134 215145 1.26435 2 6434 HALLIBURTON RECEIVED DATA LOGGED NOV 0 9 2015 li,/ /20113 Sperry Drilling M.K.BENDER AOGCC To: Alaska Oil and Gas Conversation Commission 333 W 7t" Ave Suite 100 Anchorage, AK 99501 Attn: Meredith Guhl From: Sperry Drilling - Alaska Attn: Robert Haverfield 6900 Arctic Blvd. Anchorage, AK 99518 907-273-3559 Office 907-273-3535 Fax Robert.Haverfield@Halliburton.com Re: Eni Petroleum Well — SP28-NW3 & SP28-NW3 L1 AFE # 7394 Rig — Doyon 15 Spy Island —Nikaitchuq, Alaska Shipment Includes: 1 End of Well Reports 1 Final Data Listing on CD-ROM 1 Sets of Final Logs —for each well contains: • 2" Color Log — Formation Evaluation TVD • 2" Color Log — Formation Evaluation MD • 2" Color Log — Drilling Engineering MD • 2" Color Log — Gas Ratio MD Received By: Print Name MAiga.414,..4) 6..e.Rxeft Sign Name Date Please sign acknowledgement of receipt - email, fax, or mail back. Thank you. 215134 • • 26366 SchlumbergerTransmittal#: 190CT15-SPO1 Drilling & Measurements DATA LOGGED 1o/23'2015 MWD/LWD Log Product Delivery ::i.K.BENDER Customer: ENI Operating Co. Inc.Alaska Dispatched To: Makana Bender Well No: SP28-NW3 Date Dispatched: 19-Oct-15 Job#: 15AKA0090 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Product 5 Contents on CD N/A VISION*Resistivity 2"MD ;, x x VISION*Resistivity 2"TVD i. x x VISION*Resistivity 5"MD x x VISION*Resistivity 5"TVD OCT 15 2015 x x VISION*Resistivity 5"MD IMAGE x x ADCC Digital Data N/A Contents on CD N/A ASCII/DLIS x Survey 1 Contents on CD ASP Final Survey x x EOW CD 1 Contents on CD Data:DLIS/ASCII x Graphics:PDF x Survey:PDF/xls x Please sign and email a copy to: Please sign and email a copy to: ioshua.zuber(c�enipetroleum.com AlaskaPTSPrintCentercc slb.com Attention:Joshua Zuber Attention:Stephanie Pacillo Received By: /li✓Qi v40 / . :g/ NUD ! ! ►h Lo UA 0 PO .r..0-4.. Od fO Wr CONN,W OQNrr 00 d0Q W drd NNdON 40)0)00 OW 0 .^ OM M N W r O'W N N r M r f0 N N M M N W,M 0 Q W W d v) O M O f W N- 0 N m u' !^ a '"°' O O O O --"v- N d N (0. 0)O A N I O N M Q M r O 0 0 I O N M d 0 M p O O I M 0.- - m W N N d W m W 0 0) 0 d O W ,V8222 d 0 W N m d g N 0 W r W r rrr r r rrr r r A A r r m W W 0 O N N M M Q Q W W W r r W W 0 0 0 N Q. rrr.,. rrrrr ,t._. rrr rrrN rmwmW WWWWm mmmmW WmWWO mm ��� N W W ..... NNN W W W W.v7 W W W ..... W W.W W ..... M h..h W W W C C�'�\1� ..... ..... N M W W W ..... W W v)W W ..... W h h W W N G OOV1 �1 66666 ;:;:: 0 0 0 0 0 0 ;;::; 0 ;::; 0 ;;: ; rrrrr r rrTrrr00 0 d d O W rm-Q mm r 0 M m N d NN:- .� ` r W N O N r W. 4411110 V NNMMd ddQdW WMrM ...Mr NdWNr NAIOdWrt.... rv)W r W OW CO m m m m co cow WW W CO W 0,0.- N d CO 0,N W CO r d m O M r r N d 01 VO d W O W N 0 W ♦� co W W W W W ..... W W .000N rrWWW ...00 r r N M M Cry d d W W. p p 00000 OOOOO 00000 00000 00000 OOO J ..... 00000 .....0 0 00000 .....0 0 0 00000 ..... m 0)m m 0 0 0 N 00000 Oi666Oi Oi66Oi Oi 66666 OO6 Oi Oi 00000 66666 66666 OOi co .4-4-1-4-1. d d d d d d d d d d Q Q Q d d d d d d d Q Q Q Q d d d d d d Q e'd d d 44 C V _ m /0 0,,,-",rr CO d N.V.. Q Q M N Q W CO W W N W 0 W N 0.r W r 000.. r h M A M r N .. 1 /``i�/ CW W W N O ,..0. N 0 W M W W r d r d IO N O Q 0 ...-NO M W r 0 r IO p 0 O d 0 0 OOO 00000 mdmmM IOMfAf fV QWWWW mMNCi WrNmN Wc, MCiW rN � c—• m W W W W r rrr r r r W W d N O r Q r r M 0 W r m d O W 0 d 0 M W 0 d O r O N r cr W d Q Q Q d d d d d d d d d d d d M M N N r r r 0 0 0 0 0 O O O O O 00000 O O ..... WWW:W ..... W W W W ..... .v)W W W ..... NhWNW .. 0^r r m W W 1,--N•-•10 W M W r W 00 r N M m N.- .NOON r d W r 0 0. M r CO N C N O O m O r N W W Q W M O m r N VV... d d m W 0...01 d d d M m ....0 d m d Nrm M O L RNNW. WMOW 0Nr dr Y`NNNN NNNN NNNMM dWrO NVWCOO 0W0 NV...- )NW0N WW OMMMWM AAmMN NNNNM MCW°I MCW)M M MMM M MM M M M AAAA? V a V dd dd z ..... WWWWW ..... W N W W v) ..... ..... W h W W W .. 00000 00000 00000 0 0 0 0 0 0 00000 00000 00000 00000 00 00000 WWWWW .0.0. WWWWW 00000 0.000 WWWWW 00000 0. W Q OWN NO Odd d W r d O r r r W Q r O O W r W W d 0 N r M r N m A J'� 0 W Q N M A M N W M N N r N r M W W 0 M W r W M W m WOO r W 0 0 0 0 0 0 0 0 .. 0000,_._.- 66666 r C V N M M M M N d .-6.,66 N r N r f 6 r r N r 0 (0C)000(0 4,4 00,400 00000 000(00 .0000 O N N W m N,00). ,-1.0... 00 z=0000,4..-o-00... Mr.WA dAr0m 000,-VO m0M00 0'000 0)O(0( 0) 00r0W 00 00Orr rNNf7 W MMr 6,446 fp d d m N W W r 000)0(0 Nfi1-N N 0(0 'NN r N M .NOM. O Q W N W ..NN, M W d r r M r 0 r W NO ' '1"i" '? MgvNN f Q T r T m 0 4)0 0 r N M j .=00-- r r r Q 0 O M r M r m m W N m 0.... r O r M m m d r W 0 0,-0.N N d d 0 M. V z.-0000r N W W Q W O m r M d W O m r d N r Q r O r N r r W 0,N Q 0._O 0 A M O Z Y b OOOOOOOOrt.44.. 0 M0N O C W 0 0 0 CW COCi0 NN m r' 0MWWm ON(00 mrQWm 0LN-0 •-,V,0 LOU) 0 0 Om N N N N ..... d p Q Q W ..W CV CL me 3p ti J J O M m O Loco W m 0) m m W m O O OW O M N W r W r W d r fO 0 v0(0,-(- NM0m0 0 W N W N N d r N W W r 0 r W N d j Om CEC O0dW0rdmMmWWW00)(0O0WrrrWOrrrWmWr0m A..NWd v0 NFmmmO CC0 dr.- W0. WrM0M'MMVMWN0OrMVN NW NQ W Mrp 0 OONA 000-2MM0 e0 M° 'N.0 ., - rrr NNMMd QQWWW NAm 0)0 00rrN M' a. 3N.- a. E 2,0 0 r 0 Oi 0"' O N m ..... r 0) E00 COOrN 0,0, -.. 0.6.00,1, 3 0 O 020.g M N O W W r 0 fO W Q m H O r> ? O O O O r WW u)d 0) M.-00. m AWN N M W N N r .-No-NO 0 d W 0 d 0 p W A m V, (A 'm E 0 0 m d W N N W M A W M M M r d d d W N d r r d M A d m d d W r N r 0 m p v7 m A W M (-f L OOONNOO rr rO W vl W of c4,,.-0rrr Q O NNm d f6 r Nvi W d 6•i,46 NtiN 00 Nm Q, O Nd W W r W 0 NNM(0( Q...WV NN0 0)0 00�rL M V 0 = Z rrr r rr a C L C m o f v o= C c e 29 m C7 o v r o A 5 c N w°= T a E a o 20 ME o C o m E4Opo W c:r v . 0_1 _ 34 .' U) �1 2 -- L' " = "-111 C r C m C o U O ONO Q d W W W A m m d 0 M N O m r W W 0 0 W 0 r W r r d N W W fp m d d W W W COOAM W W rdON AA W W 00)rr M W W rd r d r W Nr W MW Om A.,N W d d0 ":9- 85555-0...: .‹ .05 .0m d N u V C C > p i.O Y 6O m . 0.22 co OOOrr NNNNN d A*-Nd W W;V W MnA W O (644r:6 W OM V O fMONM W N6-OrvA) dui N 0 ICIC O J m O m 0'W O C D C 0` > r r N NMM d Q Q W W W r r m m m O p r ' -- - O N N 4 F W v_ '� W y o Cp C ..... V E Z 0 0OO p a o,o, O7u OYU- o A > > 0 0 0 0 0 0 0 0 o c O m rn ur» t�frc���0�zc�1 J _ $3=00,.00 MMOWW r N O 0 W .00.N. W W N d N N r N W 0 M r W dr g d W 0 NO O M m W r CON... W N 0 W W ANO O N m M M N r 0 W W M N m M r.O) Q p M W m WO 0666•- 0)r 0 f6 f6 O C)76)0 0 r O r CV N r O ni 0 44666 N N N N. D ry Ci f6 f7 64 UlmL 0 '0. (0O 0 r W d 0) W d M N N .-00,0 d N r 0 A NOW.. O N d A m A N A W r N N M M d W W A m m 0 0MV... ,...0 r N N N N N N N N N N N N N / CO) rrrrrrr N .0,-.V A A d 0 0 W M d M N m N r r 0 0.0.. W r O Q r 0 m 0 W M W 0 M r0 Z 0).-V .00 r 0 M A M N r O 0 d N N M.N.. (0(00)0(0 N.0,-. N r W W W W ..W 0 Q NW 1 0 Ci CO vi A W A O of N A 0 N tri A m oD W Ci d((pp W O O A r ci d Ci CO W N Cj 0 0 0 Cl O W L 9 0)0 0 N W O 0 d A42,70°. W W A W W d M N 0 A A V M N A W M O W "8"'A— "m—^" mrAN W O N r N N M M d W W A W 0 0 - ..... .....W W W r W m m NNNN N NNNO N N LL W r r a. fn N O) Cl)/ O 0 N=t" M O O O 6 60N, o e'OOOMO (0(000 0LMMA W 0)0(00 W QONA r 0)r0M ..... 000N W W. O O M M N W W W A W V10.-,0 0 m W N m ..N00 0 r N M W W M r W r r W W N N W r M Q C N- f I A W O W W W N r W C'i d r d G i CO W f O f(i r o D u D ! 6 Q Q O N O p i 0 O 6 p r N M N N 0 0 0 0 W m m O N N W r ..... 0 0 0 0 0 ..... 00000 0 0 m m 0 (Ow... 0 0 W N p E (0040(00 0.000 0(0(0(00 0(0000 N N N N N N N N N N 00000 N N N N N NN e r m V r o — c v) .E1E,;(6 A F N• N NW O(ON y r O O m m W ,WN.. W W W d r C0,0/00 O 0 r 0 N10,-,-. MWWO d p r d W .N LL >>0 0 ,..°0,-.0,- W W Q d W N N N N N ..... W r d r W OV... N r W W M ..... W m 04E NO r M yr OO00000 sciviCUr 6,ON6 ,,000D OrMdm OrN40 6pv60On Nm NONNO r NNN NNNNN MMMMM ddddW WmWWW WW MMM W h aO JC> M> n f0 Q e,M° O L m Z Z N Z N m a N 04 C N op E N N O 0 W W M 0._ ,,, ,,,,,,.,60,s088"5 N N f.N 0 N 0 A W O W 0 U)W Z U)U)W W(O M V Z Z Z O O N ffpp 2,0...r ...NW. N W W W N V N r 0 .0.0.. N W 407 N W m M r ...00 O M N•- V,1-,. M O W N f00 O V E goOroedr Oir Cif6vi Ocif66Ci f666 of 666rif6 Oecrp ro Oo6r0 f6auQWr uiab it.' m Q r'W r.-.4m W d M N Nr00.00 m r W W Wr00.00 ONO.. N W N r r OM O • q C r N N M M d W W A W 00,-.-N .'W W r 00000,- N M d W W r r W 0 0 fA Q .-o- r,-,-,- ..... N N N N NNN N N NNN M M. n 0 u X c U) W 03 E C W m` N o 5 Y J 2 >u L M IOC d N ti- TiC u m ''k oJ0UgLL O O g N Z 0 2 m C C.O N C ▪ O L O�T�77 a V�'.O-+f7 fO N E m co t o 0 9 p- .. Z C C 0 0 0 N O E W M _ m. 47 2 71 O a > > p O O O� c a`7 0 K UILN31O QmN1-UJJU(7> U K 0 0 • • 0 0 3NJ ep VO ON OV 10 rWOV0)01O W M0W NMNMW WWWONNMMN NONm 010100OC -Lf, NWMM MCO CO NOWD MYNONrrm NMVNONVW6m010M00 .-NNNMWVVNwmpNn MOON N WW W WWWWO CnVVOOp r0V UDDnWW NN ...mo OOOOO OOOOO 00000 OO--i .-NNNN NN WNN WW0 NNW ( W WWWWW WWONNNNNNNNWNWNpNp NNNLONNNWNNNNWNNWWpNONNO OpW W0W0O WW pp [ ( . 2 0 0 0 66666 0 0 0 0 0 66666 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66666 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 < rNn NrrNr rNNnN Nrrrr NNNNN NNNN, rnrNN NNNNN NNNNN rrnrn NNNN, ,NNNN NNNNN ,N 0 d CO M N r W N W O N V M 0 M CO W 0 N O N-00 W W 0 CO O CO M W V N NO 0 M W W C N CO r CO M CO N V O V N O W 0 N N 00 N W N W r O CO V O) VOD CD r N 0 CO 000 W W N r r r 0 N 0 M Mu)r N W CO M O N-0 0 0 N CO W 000,N W M O c00,0 0 0 N v.r(00 M CON r CO 0N p W M V 0 r W MN CO W O r CO N CO V O N V W V 0 W N r M r N CO O V N r 61 -0,0361 t0)WrW r CO O V N 0 r V O,N CO CO N W M W W V M V W W CO Nrr N W W V W W O WM0W WM.-1CO Om0( 0 ( 0mOmON NO0) NO NMNONNO ) W NNW 000WN OWO ( 0 COCCD OW.-00v0 VNO,rV 1 O NN LIO C ,r W W O 0 r N M M V O W CO W CO W W O.-NNW CO O W O r CO CO W 0 r N M V V O W r n CO W O O r N M V V)O W n r CO W o O r N M M KI-LO pN N N N N N N N N N N N N N M MMM M M M M MMM M M M V V e V a V V V V V V V 46666 WWWWW W W W W W 66666 60J O)m A 66666 W W W W W W W W W W m W W W W W W W W W 66666 W WWWW WWWWW W o W W O)W W W W W W W W W W W W W W W W on 60;6 MOiOiO)Oi Oi Oi Oi Ni O) Oi Oi M Oi 66666 66666 66666 66666 66666 66666 66666 66666 66666 Oi Oi NO CO e V CO v V v e CO V V V V 04444 V V e v V CO V V V V 44444 CO V V e e CO C V e C V V CO V e V V CO 0 vee a CO V C V V C V CO V V e e CO e V C V V CO V (y W.-WWW W N e W O W r N O W W r W M r ,M r r O M r O M r M W W e V W W W r r r W W n N N O W r M W W O M N OM C N N M W 0000,0 M r W W r O e N W W W I ar r W O r N C M r C W O r M O M r W W M N W V N W N 66664 6N:666 664N6 O cdr:64N 461,.:66 e-6664 664Nd 0 W 000) WCWpMNW00N2CWVWN.- NMQNOWOONNV a-OAWNMVMN.- MNNOMNN OWV MWOVO MMWrO OiCGON OMN r W OOOUV W 000 W W W W W W W W W W W W W W W W W W W W r r,r, ,NNNN N O O O O 00000 OWOOW .0000 W W W VV e V V V V VV 00000 00000 00000 00000 00000 OOOOO 00000 OOOOO 00000 00.00 o 0 0 0 00000 00000 00 .0. WWWWW .0000 W W W W W 00000 WWWWW W W W W W .0.0. WWWWW .000. W W W W W W W W W W W W W W .0 0^W W V e W O r W W N M O W V V C e r W W N W e .-00c000.0 O W M r V V W r N r 00000 N O W O W r W N N W W N W M O M W v W C j W e VOD N W W O W Mr-00,M O V N r M O M W W W W N M V M Nat.-00, a r O W W O W,W r e W N. V O W O r YWNVMmOON MNOWO66666 O.-M00O , ONMNWr0WMVNMNMW h NNOi M V Oe NON MWW WOrNeWW 446. c,5 MW MO NM. q44:74 CO v v v e 44:M4 e eV VV V CO V O V 44444 e V V V V W°4-4'” VO V VM N N 0 0 0 W W W W W W W O N O N N Z W W W 00 W W W W 0W 00000 0W W W W W W W W W W W 0W N W W W W W W W W W W W W 0W W 0W W W W W W W W W W W W W W W 00000 W W W W W W W W W 000000 0000 000 00000 0000 00000 00000 000 00000 00000 0000 00000 00000 0W 0W J O M Nm V10NONO NW NO M M M M WOCON M10WNNN mm NWWr erO N OWMON WWONN W O O O V N M M N M N 66666 0 0 0 0 0 66666 00000 66666 fV Orr 0 O O O r 0 x 0 0 0 0 O Orr 0 O O r 0 0 r•-r 0(V CV O V W N W r W rW W M O V r W M W W o W e W 64666 N v O M M W r N r M W N W N r O V M e W N W O W O 0.-00M W 0 W W WO W O V W O W W W W r M V W W W W r N v W W W r N V000, O O M N r 001.-0V O r W W 66666 W r M O r W W W M O V O o 0 W n OiMM 6446r: ON V OW ON.NOi r6666 N V 666 N V t6M6N V Nr 6,-N46 64666 666,:6W r W NMO W 66W N W M N r 0 O W W 0 O O V M N N r O W W W r O W W v M N r r O W W N O O O O W N O W W W r O O V e M N r 0 O W W r O .0 M e ld O W r W W 0 N M V W O W W W W 0.-NNW V)O O n W 00.-NM CO V O W r COO N M c W W 0 ,W W 0 r 0101 e W W r n W W 0 N r 0) N N N N N N N N N N TTM"g V V I V N N T W W W W W 101)100)? N WWW T O O O O r ,N 00-6N r 66666 N W W N O W V O N O W,r W W a-000)01 W e N W r W W r W W VON N r M W N)() MO Z W W W r N W r r W W M N W N N N r W W W r W 0.-00V NNMW, ,M W r W W N r O r 0300.0) W WNW r N O O W W O W M V N NV 666 66Nrr rOrNr MO)(i Oi N MONO V 6666r 1:MO CON 666F:4 Oi MNr: O MOOT N 6.-666 MN 60) M r O M 66 O M 0 W N e O r W O N M W O W W O N M W O W W N e W N W O N M W N WON V W,W r N V O W N W O N M W W WM.-NV W W O N M 00 DO 000 O N r„ N W W W W W W W W W 00,030,0 OOOOO O r N N N N N N M M M MMM M V V V V V VVW W W 0.000 O W 0 V W r O N N r N O O n M r W W N WOO W W MON, W O e O.- N M N M W W O W r N ,V W W N W O V 0,N W W W r v V MOO O N W ;zoom-W O N W W M W r V O W e V M M V M V )O,0),r W O M O W r W r O O r W O r N MCO O W O V N O CO N W CO CO W r N V W W N W W O r rco N Me)6 66646 e W r0)r M)nt`Nir M)()W OM 66. 46 6N66r V rrvr 6666,1 0010 W N 6 W ren O V 0)6 V rO N p .-06 W N N O W v M N r r O W W r r W W V V M N r r O W W W N W O W V V M N 01.-00,M WrNWW V CON N .-000,0) C0,000 VV .00 W W O r N M e W W N N W W O N M e W W W W W W O r N M e W n W W O.-NNW e O O r 00 W O N M WOO r W W O r N M 0 r N N NNNNN N NNN M M MMM M CO MMMM V V V V V CO e e e e 00.0. W O O W M CO W W W W 00000 W W W W W O W N„ N N r CO Z a- V MN0V O M NO.- W.- NVr .- `NO O N N N O V N lOrMr NOVr O MOV eWVNMNWN NMO NWWN WW WWVW M W W ��� airarr ar�rar dN:0 NOMNO CDNOMN OMNOM NOMOO CD ;OMC OMC6oM <60MN0 MOOM0 6M66600) d COO woo r O O W v V M N OM O W r O 0 WV v M N N r 000, CO CO,00 O V e M N 0.1.-000, CO C,00 W V V M N N.-000, CO, 000 N W W 0 r 01(0(00)0 N W W 0 O N MCO W O r W W O N M V V ICON-COO 0 r N M e W O n W O 0,0,-NCO v W O N W MO.-NN M V r r N N NNNNN N N N M M M MMM M M MMM a e e e e e CO V V V V W W W W W W W W W W 00000 00000 ON N f0 N T 0 W r W m 0 V W N.-O 0,0.-V 00,0V N M a N M N V r N m M ON)V O M N V V.- W M N CO M r V m W O NON W W O N V M N 7 CO CONDO) N N Oi O O O O O r r r r N N N M M4466 W W W O r r NMM V e CM M N NMMMM v 0 v 6 D 0 M Ni O r NMOO1NMV0N10aNmrWOWS�NV010OCMMW WM - W0WD WW01NMVM) W CNMV VOWN WON ONN0. L NM U r r r N N N N N N N N N NN M 0,000,M M 66 M M M CO VCO V V CO V V e V CO W)N)()W W W W 10 10 W 000. 0 0000 W00, z j EW MOnJ ONONO r‘;'4822 CDNONCn NM CCICN W NNC N OONNOMD 22g1(1-,T NWC-Wm &>"',14) rr.e-W O N W'W N rOr W O F.14 F- 666 W O r W M 66r66 66666 N C-e n O N W W r V N r V N-O v O O e W N W W N O W M O W N O W C-M O W N O W M O N:Oi N N v CO r N 00 N r W CO W W W W O O O r r N N N M (CCC)M e e 01)10)00 00 N N r COO W W W 0000,- N N N N M M M v v e V W 10 00 M MM CONN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NN CO 0 W r CO V r O N O 0 N 0 0 0,01V00 N W O N 0 N r N r 0 CO W W CO r N010.0 W M V e W O v W N r v-0,0001, r O r CO W W W MO N W W 0 r t0 M W 0000,-V r M v r O 00.:0003, N O N N W r W r O M O e r r M N.-0010, W O N W W V,r n M000. W O O WNONNMOV 000NOMWNNMMMOVWWp ONMV V00 WWNN NWDMM Om000 eeNNM COWWWO0WW W0r0N rrNrr N,NNN ,,WWW O0OWW COWWWWW WWOWWOONWWW MW N N N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN 0(00(00 NNNNN NNNNN NNNNN NNNNN NNNNN N N O^O W N W W M e V N V O r W000000 W N V W V M r,V W N n r r V 00.-WV N W N M W O W M V!!pp W W U)M M 00000 N W W O 2-00,N M,O N N M COV M W W N N W N N W N W O M W V 0011-00.- O n N N W e V M N 00,-WV o O V e W W r V r N W N N W M F O i I O V C i O M M N i M W W 00000 W W W W W W W W W W O O O 01 O N N r O O 66666 n n M n M O N O N 1 A O)O i 0 0 0 N r r 0 M M A W W W W W, r r n r n r r n r n r r n r n r r n r n W W W N W W W W W W W W W r n r r n r n N r r r r N N W W W 00 W W W W r r E N N N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NN Q V^N r 0 M N n W N W V O V O ,,NOW W O N N O W M W ,01-MN OOWWW N V W O O V W O W W O W V O W r r W W e O W 0 W W NW C O N O ,N011-0 V r e e O W N N?O?F 01( 00 O N r N W 000,1-030 O W M N O 0000.- W W W r V W r W N N O W W VOW W NO NNNN OWmmWW mmmmm mmmmm mmmmm mmmmm mmWMW mmmmm mmmmm mmmWW mwoom mmmmm mWmmW ON f O V W NO WWNWOD 0)10 3. NONOVNNVOMNNmN OOQ mnCM, W - . NOWD WMOO OWM r1-NNMNWW OWrrWNV OMNm� WNNCOWNmr WMVMMNN� OOMmOrmOOVVON.- OON OWAOOr NOV MMN- OOiNO NOOOmO NO CMMMV p V0 0)1011) NN _ NNNNNN NmWWW mmWM 0 C0MMCOCOY VVVVV 0N0 010 000 00000 OON NNNNMW Wm MM n 00 N u) U 0 C) E C U • • III III 0 0 M O e V m W 001001N 000Mr 00,00 r,-NMO ,-,-NV, OOrr V mO W NN 0N0.-W QM0 W,- MONO,- OQMNM ,-O,MV V. 0) M--,-0,- W,-,-,-O MOWN. OWmW,- W N m W m ONO,. W W O N N O O Q W m m M N r OM.,. M0,M N O W O,- O n m N Q Q M W W W 0 Q 0) D 0mmmr VNWNW W00N m' •-NO 0,-MOM NnNWW- N,-MO, NOMVV OCOWWQ OrnOM OOVNW ONOWV .-m N OQW NWmMr WWNW mNWOM nNOOQ WMNN OVm )W Nn.- ON- Mn00 MWNnN NNNNn OmMW .N000 NQ _ MMM VVQNO 000,, ,WWW. 000 NNNM VVV0VW WWNNn COWm0m 00a)(0N NMMQV OOOVVVMCNMd NNN NNNNN 0NNNN NNNNN NMMNN MMMMM MMMMM MMMMM MMMMM VVVVV VQVQ VN 0 J WWO OWWWO WWWOW WWOO. 00000 OWOWO 00000 00000 00000 WWWWW OWpWNWWWWW NNN W0WW WW0WW WNNNW N.... ...W. N ( ONO .. . ...wt. 0OLOW 2 000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 66 Q Orn 1,-n0W0 r1,.nn0 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00 0 O r!W W N.M.,. WWmmW n M VV V M N W r,- Wm W n 0 W W M W n W W N M M ...ON N M,-n 0 O ON W M V.00. OWMOW M N y,- WW NONVV NOV.. OV,-WO WNMWO aNONMMW n,-WmMWVMONWpMVON W,- n rnM WNW. mWVN0 WOMn MM... 0.0.M rNV OW OMW Mo,V OM VO MN Wr MWVmW aWNWQ M.,-NN WMmW0 WnNn MWMmQ mVONO .o.VON WVWN WO „ - WmMW VWWWr W l 0OWN MOWWM WOM. WOVm OV,-MN VNmrV NmrQN mnNNO N.N.N. VNmWQ 0 001. WMMOW WNmWM ON - 00, Wr Wmm0•- N N M V W O W r O W m N M V V W W NNW.. 0 0 NM V V000n Wmm00 NNMVW WWWWW 000,-N MM 0 0 WWW WWWrr rrnnn nr0rr rWWWW WWWWW WWWWm mOmmm m mmm m m m m 0 0 00000 OOOOO 0,-,-,-,- J mmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmm 0 0 00000 00000 00000 0 0 0 0 0 0 0 0 N 666 66666 66666 66666 66666 66666 66666 66666 66666 a;600 66666 66666 66666 OO 04 444 VVVQV 44444 V Q a Q V V 44444 VVVVV 44444 QVQVQ 44444 Q Q 4V O W ..... WWWWW ....to V �� ( W^mO,- r Vmrm O V M M O V NW mQ 00,-NN O N W M W M VM W V V V NNM O W n N W Mg-00V naV W MmOW VOM,-. NO C N m r W M,-.W. r V m W N W 10,-r W VN,-00 Om00mm O N W n O MVV,,- W m V O W .MN,-,- M V n W n Q O Q N W r n 0 n M OW -7 6 V 0N O O0 n W 0 6 NV fNV O fM-Qi M O O rN VNO W 1D M ct 6 0 0W V(r 10 6 10O1-NN O Mro r 0 6 6 0 6 g4.1-1,t0 W O N 0i c'°4(7, 6 0N VOm 0r00V MMNm0 mWnON VMNNN 0mWnO 0VMN. 00 0Wr WO MN OOmW rO0QM NMOm WrWOV QM W VM MMMMM MMMMM NNNNN NNNNN N 000 OOOOO OOOmm mmmmm mOmmW WWWWW WW 000 00000 NNN NNNNNNNN000NNNNNNN NNNNN W0NVVVVVVQVVVOVVQNN NNNNNNNNN N ( VVVV V 0=0,0 '0 N-,-M 0000 r1-N000 N M M W W W V r V 0.0V0 NW N O N ,-N000 W 0 0 0 0 W O r r N NOW V M Na) 0.-N NW M N W WON,. O Q CjNOr NWVV MrNN0 0,-MOM NQN1-m OOOMO WN000 WVNM ONNQM 0mNMM MmVVQ WOWN mMVmW )0M YmON W0 MOW !NNWnMC 1- Q ONVN0M1 N-WNMN OWW,-Or1-g MOOONV 0mVrO OW 0NO nm 0 NQW NM ,-MV Q 00 O 222 WM MMMMM 32322 VVVV VVVWO 22222 100WO 2OWWO 22t7,2 N t0 r 222 WN WWWWm 22222 mmmm O{O 0 O W ..... WNNNM M Q Z 0N0.0 NNN 0NNa 00 00000 00000 00 00000a 0000000 000 0 0 .0 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00 W O O 00000 OOOWW 00000 OOOOO 00000 OWWOW 00000 00)00)0 00000 OOOOO 00000 WWWOO WO W M O O M W W W W 0.00V rO,-Mr m W M,-W V)N M O M m m W r V ,,-0,-V N M O,-N ,Q,-NV WW00V M WO N M M O A N NM _J V W M r 1-M M Q 0 V 0 r W N W V W Q V N W W V M M V M W O N V ,.-0..N M 0 0 r M N O N V W M W N W V V,-.0, W M V W m m 00666 01-000 6.-666 66666 00.-00 66666 dodo 011N (4(0000 . Ocd.- 66666 ,-O O N N NNNNN M N ..-(00,-M V W ,-MON. ,-00.,. N M W M r 000 V M M m N 0)m Nam.. M N W 1-W 0,-,-VO 0,-,-NN V O O V,- V O M,-0 M M O Q O N, VOr00 O N n 1 V 0,-V.0 NMVWN W 0 W O V V N r O M 00.01- W M W N M N-0000 W O Q N M O m 0 W V N N N 1-Q NW N101- 6.-666 oN V n6 . 4656. 66)n6.- 66'..:6.- 0)10 WO N6)6N0 O. .NN NNNNN NNNNN NNNNN NON NN- 66 Q M N 0 ,-,-00. W N W V)V V M N 00(0 r n (040 V M M N'- 0 0 W r O 0 V '00)N,-0 ...NO. Q M N,-0 O W n W W VM,-OW (O V M Q O n W W m 0,-NOV W W r W m 00,-NM V W 0 r 0 .0,-,-N M V W O r .00,-N !!V W W r W m 0 N M V W O n W m m 0,- '- )- Z n0'Z I� T ap T a0 T ap00 T'?W m0)m0)T mA 0)T 600 00000 OO '-'-'-NN NNNNN NNNNN MM M M Q W m !V r N W W M W M. M W Q W W 0...0 M m V V V ,-.0,1,- N N m O n n O r N,- O W r m N r N r r N W W W m m M m m M m No z.-,N. O W m O W N M W 000,-. M n W r W N O W W Q V m V W N M m 0,- OM... M W N Q W 1,...,-NV N m V O m W N W N O 00 Z M cd M W N r 6 6666 N 66 66 46466 .-n N 64 66666 M6V.-W 6.666 VOW6M N O co N 6664 n 446 co O W m N- N4.1--.6 0 CO N M W 0,..0,- M V 0 r m ,-NV., N V 0 mONMO r W O N M W r m 0 N V N m M W W W O,-M V W 0,-V,,- W O WOr ,,NNN COWWWW WWWmm mmmmm 00000 Or- r- ,-,-NNN .NNNM ...MO VVVVQ OOOOO 000, NW N r ..... ..... ..... NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN .NNNN NN d 0 MM O V r 04,-Nm. O m W r M r W W W V W W W W W Q V M Vtp . MOWN M W O n N r n r V M M,-r,-N .01,-,-. WNM,-r r O m O W W M Z ir V W r mo.-Nm 0 0.-N N.-,N V W m,-M W m N W r m N V V O W O N W N M O W O V)W V,-r V)M ,-0.N. .00N, M m N M r M G 666 N W 6 N 6 6.-4N.:6 666N. O VI W 46.-,41-: Q r O M r:66,66 . <66,6r,: m N V W 66,'64 O h m r-N 4.6F:66 W t0 N MN,-,-,- ,-0... r r W V)W V M N N 1- 00... n W O W W V V M N N,- 00.., r W N V M NN,-0. W r r W V MNN 00.1,-0 N V W W n 0.0.0,- N M V W O ,...0,- N M M V V) 0,..0 N M Q N 0,,.. O N M Q W n W W W .0,-N. V V)W r W W M.0,-,1 M Q 0- U r r n r r r W W W W W W W W W W m m m m m m m m m m m O O O O O O O O O O O N N N N NNNNN N NMM M MM M Z Z _�MNO V rOMN 100 W,-1WO W W MU.MN MMM W OO) Mn000')0 MNN W r MNNtn00 A.NNO ,-.00,10 MV,-.V OOMM W ...NN .V0,-.00,-.. COr N Q 666 M)0OMW 6,166N (00(4)00) N W m N W m N m N VO N W W .-Loco.-4- W W O N M N 0 6 O N 66N:66 N M N r W O N Q r m N W Q, WO WQVMN Omm WrnDO VMMN Omm 0nr0uVMMN ,-100.0W nWOmQ MN,-OO mWrW0 OQMN,- ONWn WmOCON MVONW rWm NMVW0 rWmm0 NMVW OnWmO 'NMMVOOrWm ONMV VNWrW m0NNM VN N nnn rrWWW COWWWWW WWWmm mmmmm mmm00 00000 0000,- NNNNN NNNNN N MMM M MO .a r C CO W T 0 0 00... ,-V O W W O,-,- .0,-M, ,V0...0 1O n O,-MV,,O W M Q W N r M 0,-W N,,-VN .W 0,-00,- M W N r O M m V,-WO. V OW)V O 0,-,NO V f00 N O n V N Cr . N N N NNM MM NNN.-.- 0000 6.,,,,,N NN M MQ 46666 rr66a d r0 V M O mm W r 01,.:106 N V'M 00 0,-e400 M m m W r W W Q M N v-00., W W V M N ,-00., W u)V M N ,-0.., W W Q M N r-0.0., O V M N•- 000,0 O V M N U) O m W n O W. M Q O W r W m 0 N N M V NO,... O NM V00,40 m 0 0'-N M Q W W r 0.00,- N!V V)0 N,..0 N M V W CO W n W m O .0 r r r n n 0 r W CO W W W W CO W W W W m m m m m m 0 m m m m .0000 OOOOO 000,-,- N NNN N NNNNN M M •@ Y_ p WV,,-. pp z 0 .,..-OVM .V-OOV W MN,-NM N)N 00,-100 W NV,-NO V OOQn m,-QNN MW V W! NW ONO LON V OW NV var°n V W,-0m ,,MOW M,- F ( ON COO V W N r.:<-,66 1 4r.:666 m1-QnO N.66.-4 I .-VW 66666 N6646 . 6.6,16 W Q N ON- I06 6 W 461,:r r W O r r r n W W m .000,- ,-,-NNN N M M M V V V V W W .000, r r W m 0 N O W 0,-..0 W O N V O ,0,-NV r m V N V 0000,- N M mmm mmmmm .00000 00000 OOOOO 00000 00000 0000M MNNNNN NMMMM MOVV VVVOW N NNN NNNNN NMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMM MMMMM MMMMM MMMMM MMMMM MN O O CON W W O 66.66 V W N Q,- N O10m N COW n Q 00,-.0 N N)-W W N N r O n ON-U)0 0 '0 0 0 0 N10 N.110,-. ,-,-,ON OW 0..-,00 0C'1(00a) 0(00)0W 0.00N WOO.. O O)0 m N O W O r N m Q 0 0 W 0)0400)0 W W m.1 N m m n N 0,-00V m O M M O MO O)O)O) a2i2m 2m 2,Am m m 222V,;-, M M W W 2 W m M 28 00000 00000 000.-! QW mN NNNNM M cI2 M T4-- 44-4- V V NNN NNNNN NNNNN NNNNN NNNNN NNNNM MMMMM MMMMM MMMMM MO MMM. MMMMM MMMMM MMMMM NM 2--VON ^W,-m N W V N M W O r m W W N r M W)0)0 V m W,-N W N m WOW O V O W N O VV,-,10 W r N N W ,-,,-,M ,-,NM. W N W 0,- MN V O N O m N m O m n W N M W r N Q O V V m O m W W W W W W W W O V V W n O W ,1,-NM. (0.001- m W m 0 M,-00,- W W O V,- MN F 666 006666 ODh1�00x0 1,:r.:666 66666 66666 600)00 06666 66066 66O N .00 66606 101 OMC0 6 r r r nnnnr rrnnn r n r r r r r r r r r n r n n r W r W W W r r W r r r r r r n W W W W W W W W W nnn W W W W mmm m 0 E N N N N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NM Q V^W N N V O O Q Q W N r N r W M W W 0 V.00. W V V O W N W N m W m N N O O V W N V W W W O r W W m W ,-(0,-WV W N O,-N M 0--.NNN M M M N M m n W M N N,-0,M v.0,-. V M O W W WNW,. O O M m N l N W W M ....00 M r m O N WNW.. M0WWm N r WWWWMMMWMMWWWWMW WWMWW WWWMWMWMMCO WWmm ,6666 nnnnnnnr66666 NWmm W MCO Monr MW 0�V WMr,-W O V g0 .0,-,-M O m NM O OMnm,-NrO V MN mN nO V0W rO Vm ° 0M O W O N0 VW WmMr,- NOQ WN O . V 0 rNWV000 V r Q CO V'U) W”V 6 1- Q O L-V W V W•-)0 O r-10 W(,1 V)W V)W V)W V-V) Co V"V)W 1 0 co 0 W 00 N V) 00 N W W N V)00 N 60 N 10 W 0 V Q MNN,- 000.. O O m W W r§W O V V MNN•- 00.0. n O O W V V MNN,- 000W. r W O W V Q MNN 1- O O m W W n O O O V V M M0OMNmO 00p O00O�NMQ NOON. m0 NNNNNNMMMMMMMmMVQVVOVOOCNNNOMaOO000 0 NNN MM V ,...0,- W N N 00 N 0 U g w Q C O) E c E V • 111 D • • O d"`Q Nm 000 MOOD N.W OMO ,-COMM', CO r NO N W O W O 0.00,00 CO,MQQ QOr 0 OOIO r N QN N CO Q0r N co Nmr rO M 0 N O W O Q r O r .-N N O N COON-CO, N M N M r NMN,CO 000, N N N O Mn Orn,CO W N r 0 0 0)0,001 ON rN.O M Nr Nr°r Nnr CON...*N,Nr Nr Qr Q CO r n r Qr N LU MOV MN �WNN ON2 y OOr CO OCO VNVO OCOMM V NONWO mW0CO.000 LNONNWON .-LM OOWNN MWOO ,1, VN,-OCO. 1NOhW0 rnN LOpOOO rNQCOO 030%-MV MMOMVNVVVVd WN OOrr NWW WWWWm mmmmm mO O NNNNN NNNM M NN J WWW NOWWW ONNOO OOWWW OOOOO OOOOO OOrrr NNN. NNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNNr cN 666 00000 66666 60000 66666 00000 66666 00000 66666 00000 66666 00000 0 0 0 0 0 66 rrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rrrrr rr O d r Q r 0 N W Q O n ,MON O mW,O Q M M N N N W O W M M O O N M m ,NNN Q NN-NV, W Q N r -�OMM 0r0N0 CO OOOm VN00WOMrO WA00rWM M N.- N N = OMW NWOQ0 m040r WOm OMrrm ON WmWN OmQ NMW MNNO N O N L p O M O W N N t N N m ,N M W Q O W N M N r O O O W O CO M N N r 0 Q N NNN M W N CVNOrnmON0O0N WVONW NCOp NV0W WrWWO ,-NNNN'0NCOONMO0100•- N V (OO0NNN 2W 00NN NQ 00 MM CO •- L() o ON N N N NNN N N NNN N N NNN N COMMON) M MMM M M MMM M Q Q Q Q Q Q Q Q Q Q Q Q Q O .4-4.N N N N N 000 0 0 0 0 0 00000 00000 00000 00000 00000 00000 00000 00000 OOOOO 0000 00000 O O 666 00000 66666 00000 66666 00000 66666 00000 66666 00000 66666 00000 .66666 O O co 666 NNNNN 0.04. N NNN N N NNN N N NNN N 00.0. MNNNN 00.01O N NNN N N NNN N ...NO N NNN N OV) (�J 777 11717 77777 '77777 . . 7 7 7 77777 71711 77777 11111 77777 7 i d)^Q r m OW Q N CO m m Q COQ N.MM N O) OON.M OCO QCOMM CO MU OOi NMWN O O N Q m N,QNMMMONL W W O N r NCO OOQWONWNrNN Wr NW rCOMQ MO Wr mQ CWNO OO QWM Wm,r MN NO WQ OQ, CNMCOr OrW gEONO WNNNWM MrNNON NOMInM NNMNM ONW'0 OMONWOW.-0 ON.i0 W O m W W r 00.V . M M N r O O m W W r O N Q Q M N r O m 000,0N N Q M N r r O N N Q M N N r 0 O W r O O WWW Wrrrn rrOOO OWWWO OWW NNN NNNNN NQQQ QQQQQ QQQQQ QMMMM MM '0 '0)0 '0 )0" a " vvv " )0)0M"MM""M '0 )0)0)0M "'0 '0)0)0" )0 )0)0 '0 )0)0)0 '0)0" " " " vvQ" )0 '0 )0 )0 W^M Q rW N O r O '0 0 0 W O N M M W N M%--CDN, O CO M m 0 N W r r ,O,M n O N O M W r W NOW CO M.-W m O r Q O r 0(0 O N N ,N C CO N r m NMN N O r N W O M Q Z N N N N NNN N NQ N O r M N N W M r Q O Q O N O n W N O Q Q O N N r N Q O O N O r O N. 6646.6 rrircriM .01OOVOMMCOMOMNO'0OONNW'0OrOOrO0 tEV.N NON. 0mO'0W OO00NW VOCOOnV W NNMMQ 0N00, WWmmO MMMQQ 0.00, rWmmO OrNNM MQO00 O,OM0 WOW ,r,rW WWWWW WWWWW WWWWW WWWWm mmmmm mOm00 000 00 0 0 NNNNN 00 NNNNN NNNNN 00000 NNNNN00 000 00000 00000 00000 0000O 00000 00000 0.00. 00000 0.00. 00000 ... OOOOO ..0.0 WOOOO 00(000 ..... OOOOO ....0 O O O O O ..... OOOOO ..... OOOOO .0 CO QNQ NNNON COCOQN NNS-W N NQOM W NQNr W MQOQQ QOMON 0QN,Q Orr.-o OM1,QO QNotM NM W N W N0 J O N N (or-,m O Q M r Q r O Q Q M m Q MON 0 0 r m,m 0 N M W m O WOO Q(O, r N Q r 0 n N N M O N CO m W O M r m,N V000, 0OOrMM N r r r r r 0 r r N 6.666 MOMNQ N N N N N r r M M 6 r 0 r N 66666 r NNN r 6.-66.- lVU)NNN r r M r r M 3 O N O O m Q Q O N W W N W M N O O m W N W r O O N M r O m,W N N r N N, m N M r, W W O Q O m,Q O N 0,-0100 ,m N Q W W N O N N r r O O Q m Q O m ,m M m, N o r Q O O O O M W 00w-010, ,.W N W m r m M N ,NMN, O m,N m r M Q N M 646 MM(OO.- 64.-66 CO(OOMO 66666 O 66 0 MD MOr MO NOONN 46666 OOOM MO MNi O 646 V M NO, QrWNN WNNWM OrQr WNMO, Q6OW, NQNOLONMrM O'NmO MOWNM rmOMo OMmON COO NMM QOOO, rWmmO MQN0 C ,W mm0 NMMQ NO,W W COOrNN MQCONO r W W 00NMQ QNNN, ,OD COMM M MMM M M MMM Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q N .0... NNNNN 00000 OOOOO 0000, N N M N N Q Q N CO M N O Q r M r r W r M N N N r CO N Qn N r Q r CO CO CO N NMN CO Q Orr N r O m N N CO Q Q M, O m N Q m CO 0 0 CO o O z.-00M M r„W W m m N W N O M W O N N N O m O N r N r O N W,N C0,0000 N W m N O r O N M m n M m M O ,0 0 0 Q N O N,, W M W r n 6646 N ,N r ri 0 CO M W N 6 66 N CO CO Ci r W r Q O r 0 ui t` 0 O r ri 6646 IL r6 OD r 464 N C0 M r ai N(O 666 Cil0 M N r N m N r W Q r n Q W 00v-WV O 0 M m N1-0,,0‘- 00.0. O N O Q m M W M W M OVOOM m N r r N r M W N r WV,-WV , 00 M o m O O' N N M Q Q N N 00,r W N m O 0 r N N M M Q Q N N O O r r W W W CO CO O O r N M CD Q Q NOW, ,000000 0' N N M VV CV N N N M MMM M M MMM M M MMM M M M Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q '00 N N N N NNN N N NNN N ....0 OOOOO 00 0- mm... mMOON N W Q m M N,M r O m W MOO 0 M r r M Q r MMM O N r,N 8,1-17,4g1 Q M N O Q r Qr CO Nr Wr rO WO O 6,92 mOOMW QNmrM mmNr0 000,m WOOMN MMM CON r`MM 66664 ^r MN N NM Oi)r CO W 0' N 66.66 vir ON Q O6Oi.-N 66,-66 6,:d66MN OW r 006606 46 (V O M r 0 W O Q N O W O Q M W ,N M N 00)N O N M N r r 0 00 O r 0 N Q M M N ,-00,000 r O N M N OW Q N r m W O Q N WO, <V ,VVVVVVOW . NOrW00p OWOOrrNrrNrMWW1, COOWNMO U COQ QOV O. . . O0O 00tOOCO Z _Er,r M. OOON V COO ..W O0NQNOQO W L00,-COMCO3-000O ,-WW N W MO , MM N. WiO OQ OOW,-OO NOW NN CO3,C0 OOO N < W R Q r#Qr o 6r666 64666 66666 U NrNr 66606 O,-OO Q W Nr.-OO6O r 6.-000 CO O Qr O Q ,0660 Mn md m m r r O N N Q M M N W W r r Cp O N N Q Q M M N N r O O m m W W r n 0 N N Q Q M M N N r r O O m m W W,O O N Q Q M N N O N O, W m O r N M Q N O O ,r W m O N CO Q N 0,000 N M M Q N 0 r W 0 O r N M Q N N,W m 0 0 0 0 N) Q N O,W M0,-NCO Q N M M M M M Q Q Q Q Q Q Q Q O Q V Q 0 0.00. NNNNO 00000 OOOOO n„n n n r r r r 00000 00W W W WOO)m m MM .� C N (O O W.-U O N COM V W M )O M m o n L O M W M N N t 01.-0510V O Q N N W N Q M N O V N L M NMN,-05 M N L C,O O m 0 M O V ONN 0 N N N t M N 1-040,0,0 O V 0 m V N N r r O N M r m O Q.'W r 00666 0 N N M Q O m M r N 6.-666 r NOiM 6646.- N r m O O .-.6466 MNNQN O r M m O M QMN O,000Q W NNOO NNQMM NNr00 mm W r, ONQQM N(OCOW 0,00V ,ONQ CO,-000,CO,-000,, 0. 0 MNMMNNMMV )0V ?)0V'0VOW W214NO00Nrr NNN- rWWLWOWOpW CN QQQUU4000000 000 WW O A Y_ z r r Q ",N622‘7, M 2 M-v I - 2222;; N O O W W Q Nr r 0 —884,7, 22244 MOnO2222 m NrNN rO W 4P.442 W,Om NOr2M rN N r M ,r12 NNm 66666 WQ• OM 'nN,m CO,O)M 6.-66r QMCrOnDMMO OQ, OO vMCOW mOWrO OMaOr OONOr 2Q NN NNNNN 2222,7, NNNN 2222g2227, 1,1781,2 NN NNNNN NNNNN NNNNN N MMM MMMMM MMMMM MMNMMMMM MNNMM MMMMM MMMMM MMMMM NNMMM MMMMM MMMM M MMM M mm 02766, m r O O N 0,000 m m O Q N N W O N Q NOVO. m r O r 0 M m O N CO Q M,r r M m m r N r N r Q M O Q N M, m m N, 00 y,.,N N m O N M N, W W 1,OO cryo rO M NOON.Q ONW O r re')000 rQ MQ M 60466 W‘—,NV m M O MCO W O NN Q Q NMOO NW 0 .-6666 OOh NA , 404 QO6.-666 .-600 M W i . 6666 6666N: .6.-466.- NM NN' 66666 OM 0 66664 66 0U0 MQQNN 000,N rWWW0 MOM mmmWW WUQM4NN 00O0 MMMMMON MMMOMMMMMMMOMMMMMM0MMMMMOCOMMON, MMMMOMMMMNOO CONmCOCOMCOM OCCO M C Nr NcO C0 MOT-WO C OO 0 0 V OW W 22QN WO0401,' NNN,r. O WNO NC NO QNNpO06OU)0MOWO CONW - W H CN,6 rNMNQ QQQMM OONW OmOMN OmmWW mO.-NQ NrmN OOWNQ M6r` O6 NN 000 OOOO Om000 Ommmm mOOOO 0000 E MMM MMMMM ( MMMM MMMMM MMMMN M NMM M M NNN N N MMM M M MMM M M MMM M M MMM M M MMM M mm Q U^M Q N N m N Q r O Q r r 0 m N r,Q O N O m 0,010•-N r NOM m CO M Q O N W r O,r W Q,Q r M Q N Q O Q NON Or-1-000 MM C e,Q M O,r m Q N M O Q r 1COOMN N M M r r Q Q r r N 001-0100 N O N N 0 6666.- N M N O Q M O r M N COO6000OOOOmmmWCOWOOm66666 6.-666 66666 Or OW OO COQ O 6 06 6.6666 OOWWm0 m0mmmmW r r mm O W m W r r O r N m O N m O NOM N N N O Q N N m Q r W r W r, N W m N O Q M M N r M N N N W Q m r N .-00000 x-000, ,0 f wO MO O NOON OWN., ONONO, 00000, W O 0 0 m Vo m rNn-WWW r W W W W OQMO NNN NO MOO M O W NQ N.0 NO 00 NMVNS N� 0MCN 00NdVVOMNNNOCO0Omrr00.0VVMMNWr CD NNr 0COWW MWW r O O N ,r78N NQ Q QNO ,WWm0 00000 MOI-NM QNONW 030,-NM 0N00r WmOrN MVO, 6 p rWmOr NM NNN NNNNO iOO1O 00000 O„rr ,WWWW WWWWW WWmCOm mm0mm 00000 00000 OOOrr N NNNN0QWQ O N NNN N NN 0 W N 0 U d Q d h .0 o) 0 r 111 4 S 0 O"O 0 M M 0 0 W A M W_.0 O _Q Q NNON.0 N n L-00 CO ON NW N N N N CO AM W .0.-0)0 W 0 W N N 0 M ,00,N6- N U)N 0 0 N M Q. N N Q W M W 0 0)N W ON 0)00) UNL-,,0 O M Q A W WON.. A W 0 0003,..- W r 0 W A N N W Q W .N CO " L-0 A N Q Ns-0 W N NCO. M W N M 0 0 M O N Q,-000 CON-03N CO M N-W W M WO N N N 0616.0W 0 M Q 0 W O M N A W O N Q n 0 O N .60,01.- M N 0 W 0 ON d A CO CO CO CO CO 0 NN n A n WWW CO CO W 0 0 0 0 0 0 0 0 0000,- N MN J ,N N n n n n r r N N N A A n A r n r A r A r .....n A 0 W W W W W W O D 0 0 0 0 0 mm ..... N N ..... NNNNN NNNNN ..... N N G 666 ; ;;; 0 0 6 0 0 On 0 OOn. n0 O ; j: n^AN0 W O Ws-A 0 ,-A 0NQ0 N OO N Q ,-'-'0AA W W Ns.0) ,- O W 0MMN W Q0 0 0 Q ON0NQ NMO 00,, Q W00 (0 QrNQ 0U OOAQ0N N 0 Q NCO Q 0 N ON W M W Q O N n- r N 0 Q 0 000 NNM MQ .0 0 0 0 t0 N N 0 0 0 0 0(0 0 0 0 0 0 0 0 0000 0 0 0 0 0 NNNNN 0 0 N 0 000 OOOOO 00000 O O 000 00000 00000 00000 00000 00000 00000 00000 06 0-o ... Low... NNNNN ..... NNNNN ..... NNNNN ..... NN N . . . . . . i . . . . . . . . . . . . . . . r . . . . . . . . . . . , . . . . • 0) W"'N.-N CO 0 Sr N 0 NM Q,-M CO NO)CO Q St M M<-CO A O NCO 0 0 OM 0 W O n Q CO OM C s.00)CO N N W Q r 03'0 Q O CO CO 0 N Q CO Q 0 0 N N 0 M O Q C.0 M N Q n N s-A CO NO T'cNQ W 0)0 u)N0 NQ 10100 r 000 010 6644. 661-:66 66004l�6.- O pQ r 0 <-1,..--tow 0 0 0 0 A O Q n 0 Q n O M 0 0 N)0 W F- N W N N W N N W.-)O MOD W N Q Q M N N.-0 O 0 W 0 W A W W N Q Q C,0(0( 0 0 0 W r r W N N Q M MOL'-‘-0 O0 0 M MM M M M M N N N N N N N N N NNNNN 0 000) 00000 00000 00000 00000 00000 00000 00000 MM 6-6Q QQQQQ QQQQQ QQQQQ QQQQQ Q6.66-sr QQQQQ QQQQQ oN N QQ 010MMN NOA0r W0000 QOn00 Q.-WWN 0000 L-000N N00NN 0Q C 0A0 MO.-NO QOA0W 001-QA MA-,-Mn QAWQ0 ALN0.- O0)0'-0) ON Z7NnM OWWQN 0QnO 7NDCO OOMuA ONQAO trip-:.6 00705 0 ) rs-mm° 0M0NN WQ00) OMQ0N NWQO 2 8 0) WNWNN 0)0 r 0 OOO 228O80000O OO'- z000 00000 08800 00000 00000 8O800 ONOON ONN0N 00 0000000000000 000000000000000 0000000000 00 JN.-0 O v-r O W W N M Q Q N W O.-W 0 N M Q 0 W W W W W m 0 Q q-N M 0m-W M m0 0 Q M •-A 0 O Q .-0000 M A M 0•- W e-r W M N W Q Q N 0 0 0 .-M 0 0 0 Q O 0 0,-m-s' N,-NMs- M .-0.- -O O M O NNNO O.- .,OOIhO 4'-00N MO 17 M MMM M t. a 3333 Zzzzzz tb Ob ob Db Ob U) 0-0_0_0_0_ -. 00000 WC M 0MN 0 x A n 0 0- O O0n-0000 W j j j j j01 rM0 0000 NNWM Ws-COLON . F- 0AN rNm ON ,-646.,:666....i Q6.-4 . . 006U) 00MN.- 606NN 0U)N66 mOL 33333 M00 NOONW QU)WNN 00000 M0OMO 0Qe-0000-0 QC-WW100 mzzzzz 0 0 N M M 0 NN00 0000 r- N.V. QN 00F 0030,0 0 N N M Q Q Q O W O D(b ob W' A r al 00000 00000 00000 00000 00000 00000 00000 O O m NNNN N . . . . . . . . N N '..".:"; N N O0.0.0.0_ 00000 CO y W 0 N 0 0 0 0 0 0.-N W N O A N N N NMN r 0 e-Q Q W r 0 0 N N N M 0 O W ,s..000 z•-M N M W 0 CO CO r M M N M 0 CO N WO W W I-0 Q CO�r N W 0)N 0.00.00/ 0 0 x 0 r n Z O N.- 6.<c46 W O 0 0 U i .-46,i6 .-,0000 0 0 10 A C,N u)0 0 6.-640 O N N N M Q 7 W A W QO r mon Q.- nQ OON 0))V),-CO Q A Q Op(pp 0Nn-CO Q'-NQ.- N00 OM 0 C 000 co ... 0 0 0 0 0 O F-N N M M Q IO l0 0 0 r W 001 00,-NN 0 Q Q 0 0 0 0 0 0 0 0 0 0 We-CO N 000 0000 r r 0 r A A A n A r A 0 r r r r W W 0 W W W 00000) 0)00)0)0) W Wp 0 0 0 z O V A O d f ,-.° r1W U)•st N 00' 0' 01- CO 0 30000 O 0N0 2.c;;; ; A 400 W N 00.N0 N N W 0 N 'c-'.';',-.220 r0l00 2P.°'4.24 0 O n2p WW 0000) N 0 1- 0333 z Z C W 0 NO0)h M Q000N 000(00 0)N 000. Q QNN rQ0 (00 W 0(0. 00 >w ml��� z 0 W N W )0 00 N 60:666 (V 0(O N W Q O)A )0 tli O)1� <6,,:66 0 Q.'O)I: 0(0 p J 1 1 Im N 0 0 0 0 Q N 0 0 n 0 Q M N 0 0 W W N Q N 17 O 0 A W N Q N 0 0 r W Q M N 0 W A Z m m m m I O N M Q N N 0 0 0 0 0 N M Q N 0 n W W 0 O"N 0)Q N N 0 0 W 0 0 N M M _1_1,m d U 0 0 0 0 0 0 0 0 0 0 0 0 0 o.000 00000 N N N N NN 0) 000,J (n ... N N NNNNN NNNNN NNNNN C)0(C)0(C) N N N N N N N ) 00 z Ob z 0.M(WOO MN W OM Q03 r�N 001 Q AO CO Q, O-m r,-Q 000 WO .4.,-,-,..0 W NQ100 OWDNarOWD OOWD P.S.--,Nom(O ,-0,-.4-7 N Q 66r.: 0 th tD O O) .6666 6.666 66666 (0 0 O)f0 0 6.666 Oi th(0 0i(V Di m O M O oCO CO A CO CO N Q MMNr- 0000 Wn000 QQ0)NN O0 CO NAONN AQ NM00Nh C nM MppO0100000000•-0 'MN0 nW0NNNNNN0ON-.- N MM00 -q- fN NNNNtO (OM .2 NI°13c-NNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NN 0 Y M A N V 0 C CZ m V U a co U YOOMN NQOAN .00e MA ..-.W WOm MMror Q 0410t--.0W ON10OOn�n .-W mam m-0) N=00.0)0()0 Cr N 66. N006N N0U)r W ONO0 QN000 I-U0C.- 0)00)00- 0.0000 N0 O)�O0NA0 0 0 C Q N O W A N Q M N O W W n N N Q NL-00,0 W Q M N s- 0 W r W Q M N s-0 W r p W W N 0 W .a .c O N M M Q N 0 r W 0 0 0 N M Q N r r CO 0 O.-N M Q Q N W A W 0,0•-0 0(N COO) 0001 00000 00000 00000 0 0 0 0 0N N N N N N O 0 N-1-n- .... 1-m-N-1-N N N N N N NNNNN NNNNN 0(0(0(0(0 NNNNN N N j 3 c 0 0 9) z N _ QQ p _ r >0-0-w O010.‘,10D WW OW M CONst N `•-MN,-O M W 0 QO rA0)M W0 OD‘-.000 OQOYW)OOWD, NN =C C C C C C = C I- N-6 00Ih10 T N COIN N O)OO)tU N.-O 1: OOui OM 6446 OON�n (0N LL mmmmm Ij 666 0 0 0 1,-,. A W CO CO W CONN r n 0 r r r CO 00000 CO 0 CO 0 A NO 0 0 N N W WWW NN°MMM MM M� M GM N0W MNNNNNMM a COMM 'IO ' MCO MCOCOMntytCOM '° °""'°O """"°" ° 0QQQQQ 0 41 W - w p = 0 E ILS 6 m6.-4 M 0 0 0 N Q W N-0, 00 0 C. NCS.-0 Q 0 W N 0 •-040030 W M.00:0 0 M N 00000 ..-.1,-.1 Q 0 0 N Q W W MON r W N O N W Q Q 0 N M Q W W O 0 001 0)0 M O N M M m W 0 0,0/00 N r 0 O 0 000 000.00.0 Ui 10000 AN10 U10 .-666. '��00 000' 0�. 00 N0 O O O O w-.-•-N N NMM N NNNNN 0 y- 1-00 O 0 r 0 (O W n W W N N W N N N N N N N N W M N N N N N N N N N N W W N N N m W N N N O N W N N WO N 1_ N.-.-0 0)M 0) M MMM M M MMM M M MMM M M MMM M M MMM M M M M M M M M M M Mp O.n N 0 Q Q ,-NN 0 10 W m K o O"'Q O M CO WNW 0 M CO I-010 Q A N 0 N 0000 n M O M 0 0 0 Q O O n 0 .-04.-030 0 0 0 E000000 z W 7 0 0 COr M 0 N Q 0)0(0 0 M MMA N Q Q A CON Q N I-01,1 0 U)r n r M n 0 O ,- ...o,,,r 0 0 2 Q orWnr cWw 1- IKON NrOrO 0)NNN,- NNMM N N M-0.-N N�NN0) 4611)00 Q MMM.- ,,� §O 0. 0(0(00.00 F LL' M M M M MMM M M MMM M M MMM M M MMM M M MMM m 0)m M 0)M m M m M M mm O0r N 0 N N0 Q Z Q m NWN N , wF 0 W_.0 CO > M A LL J J J !0 • • N W W N N 0 V^0 N r NN Q CO CO MO' NN N 0 N O Q ,-0)0040) N N 0 M CO O O Q 0•- Q C.W N y- O O ' r -...---- N LL LL M �-00M 0000 W 00)0QQ 0000 6.N0,-0 (0.-WWW ANN.-. Q Nr�m 'TV. O q 'r O ..-66 0001010 r r.:6666 .-666.- ..-,--66N- 66666 000 A h N.,N N .. a. N O 0 0 W M W W W W W W W W 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W 0 0 0 0 0 MM 0 .-101- L cocc Q INL IOL 0)N WC U ...0 N N C Q Na N U 0 M �WN0ON0.00‘-M ,- O ,-0A 0MMMr00 NOW0.OCNIOO AQCCO O00rN00 NW e 8 U m0-Q0-Q 00g- Q CO g-Q CO u0�N 6.-000.- NON N W NN6N 0 0NN0.- 00 L O M M N ..-.-066 W n n O N N Q M M N 0 0 0 W A n O N N Q tM M N 1-.-0010 0 O C Q 0(0 A W 0 rNNMQ0MYOYO000O ON NNNNN NNNM MMMCJ 00) 0' QQQQ 7 N NNN NNNNN NNNNN NNNNN NNNNN NN(NN NNNNN NNNNN NN 0 n Lo OTo mDI 0) O C 3 N m p p U go A c w. O A A C EE! U N N 0 • III 411 RECEIVED • STATE OF ALASKA • OCT 2 1 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND G C la.Well Status: Oil H, Gas❑ SPLUG 2 Other ❑ Abandoned H Suspended❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 • Exploratory L GINJ LI WINJ H WAGH WDSPL J No.of Completions: Service H Stratigraphic Test H 2.Operator Name: 6. Date Comp.,Susp.,or 14. Permit to Drill Number/ Sundry: ENI US Operating Co. Inc. Aband.: •10/15/2015 215-134 3.Address: 7. Date Spudded: 15.API Number: 3800 Centerpoint Drive,Ste.300,Anchorage,AK 99503 •8/9/2015 ,50-629-23556-00-00 4a.Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 4439.4 FSL 1428.2 FEL S19 T14N R9E UM •9/7/2015 ,SP28-NW3 Top of Productive Interval: 9. KB(ft above MSL): •53.6 17.Field/Pool(s): 2755 FSL 5127 FEL 14 T14N R8E UM GL(ft above MSL): .13.1 Nikaitchuq/Schrader Bluff Oil Pool- • Total Depth: 10.Plug Back Depth MD/TVD: 18.Property Designation: 2846 FSL 1000 FEL 9 T14N R8E UM N/A ADL 388572,388574,388575,388583,391283 , 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19.Land Use Permit: Surface: x- 511481.67 y- 6053621.01 Zone- 4 •24,986'MD/3,552'TVD ADL 417493 TPI: x- 497418.77 y- 6057207.11 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: - Total Depth: x- 490980.63 y- 6062583.24 Zone- 4 N/A 1,860'MD/1,764'TVD 5. Directional or Inclination Survey: Yes (attached) No Li 13.Water Depth,if Offshore: 21.Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 13.1 (ft MSL) N/A 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to: mud log,spontaneous potential, gamma ray,caliper,resistivity, porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary GR/RES/NEU/DEN t 0-0 23. CASING,LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT. PULLED 20 178.89 X-65 36.85 160 36.85 160 Driven N/A N/A 36.50 2788 36.50 2452 16 10.7 ppg:442 bbls N/A 13.375 68 L-80 12.5 ppg :66 bbls 30.00 16552 30.00 3615 12.25 12.5 ppg : 190 bbls N/A 9.625 40 L-80 15.8 ppg :51 bbls 5.5 15.5 L-80 16362 24615 3601 3568 8.75 Slotted Liner N/A 24.Open to production or injection? Yes 2 No 2 25.TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 4.5 14,132' N/A Slotted Liner 26.ACID, FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes Li No 2 Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): Planned on November 2nd ESP Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period . .ip. Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate ?ice //al iiC4 .. --;';2 -;� -/c,,, ,/„.2RBDM OCT 3 0 2015 28.CORE DATA Conventional Core(s): Yes 1I No j1 Sidewall Cores: Yes j No If Yes, list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No E Permafrost-Top surface surface If yes, list intervals and formations tested, briefly summarizing test results. Permafrost-Base 1,860 1,764 Attach separate pages to this form,if needed,and submit detailed test information,including reports,per 20 AAC 25.071. Top Ugnu 2,458 2,240 Top Lower Ugnu 13,009 3,130 Top Schrader Bluff 14,239 3,362 Top N sand 14,785 3,466 Top OA Sand 16,535 3,614 Formation at total depth: ilro.iL,r 05(- 31. List of Attachments: Directional Survey,As Run Wellbore Schematic,Well Operations Summary,Cementing Report Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Andrea Lazzari Email: andrea.Iazzari(@enipetroIeunl.Com Printed Name: Marc Kuck Title: Drilling&Completion Engineering Manager Signature: Phone: (907)865-3323 Date: 10/20/2015 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results, including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey, and other tests as required including, but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only Li _ ;1- 0 > U • M c oo a o (3_c c 1 P V ®C � o 'a rj `00) 7rn 4-' NM s000 O Q. O. N a) p a) > Z I I `otio ZcpZ co - igo- = U• MW !' OOR N +, Hc ` I wp 0. _coo w3 � � RS -I-, a; oI I _� 1•. J • po m0-)C Q co cfl Eo Ci o Nfom M W Lo p I I : __ c▪ W a) 0 4) - J a) -c o_ c I c 660 UI 0 N- .-71 ' 3 � � � � m L O O (n m "voCO o C _ 00 to U Nc as � I I �_ � O � ▪ z s: O Y . J 00 ,--;',it C CD - ~ _ u) a \ o � � N c as c I M 'n °O L J N N yl0\ UCDX CD o 1 I> 4 a o N 0 0 V/ + O E O I 2 2 a) oc0 oa) „,a3 a) ' DO Y O Ec0 v 2 mN _l a� mX o �'�� CD .� ��:; c0 0 L 0) � _o LLJ � � cM o cn Q � ; �0 1 I I � � Coco 0 C N O c sp o N O co , M I. — I I r, U �t M O To c c o_c O p .� p p a� co p �+m \ co coo_' 1 I m 4 a� co 2• IC-6" o >0 > c0 E lO H > > > 01 H c0 - H *' M M W ,, U) \.'j��,, c °� N H O a) p I— 2 (N D. w 3 a) Eo co 1`�` `N ) 10 CA O U (O O .— M LLo CO M a) is O M LO '\s , CO OL CO .0 _ a) N r- co CO co D L m CO M �� d O6 c000 > M + d M d W _ T ' �` _ `- NH ° ci MH M p2 0 c sJ R V /,/ o�'L ca Q 0-co Qcn^� acn p acro � .c J mi' �` ���,�� • ca) co Q cv 'ET) N N o I L / . o f N N co _Xi. U O O CO co u) U O • ♦ *: 43 2p 7 M O \ co O O O ›,a1 c0 ) „,,,,, O N N C ' +J N c\ 4 U Q M LL u0) ” ' N i p i NCOc ') XQ- '` ° p a� 2 ) . a) cn N c a) — p (0 N`\ L c V . -' ,N N M CO +- 0 a) c0 ` , N - `-- _ ® , _ / in X $ N co N CO r O �_ T _ J _ ._ C1 RI M i y Q J N N N N N N N T CO 0CO CL (O 44' 'd' 'Cr �1' M O CO 11.0 _, ..., � * cp 00 obi w i� > r Cfl L CCO - 1-- c N COm CO ,_ co co a " " m a w U D 0 ceJ H tr) ti4 � T (11 � NN I CO Y 2 ;oikt Well Name: SP28-0 OR • Daily Report Wellbore Name: S NW3 Well Code: 29881 Date: 8I8/2015 • Report#: 1 2n° Job: DRILLING Page:1 of 1 Well Header PermiVConcession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON __ LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 0.00 103.0 Daily Summary Operations 24h Forecast Hold Prespud meeting&PJSA for P/U BHA#1.RIH to TO Fill and cleanout conductor as per SLB.POOH to P/U smart tools and RIH and drill as per SLB. 24h Summary Accept rig to Well SP28-NW3 @ 00:00 hrs.Install Vetco starter head,spool and annular preventer and test all seals to 500 psi.Witnessed.Perform 13 3/8"dummy run w/casing hanger.Process 5"DP&HWDP for drilling.Perform Diverter test w/5"DP.Witness waived by Bob Noble.P/U&WU 5"DP,HWDP,Jars and DC's and rack in derrick.Load 8.8 ppg Spud mud to pits.Install Diverter line pup and arc.through MP #1 back to pits. Operation at 07.00 Picking up BHA#1 Lithology Shows Mud Weight(gIL) 1,048.5 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan _ Oper.Descr. (mKB) 00:00 08:00 8.00 8.00 DRILL C 20 P PJSA Install Vetco starter head,diverter spool and annular preventer.Test all seals to 500 psi,witnessed.Sim Ops;R/U ODS suit cases and test.Perform MP#1 welding ops.Cleaning pits. 08:00 09:00 1.00 9.00 DRILL C 20 P PJSA M/U Vetco 13 3/8"casing hanger and landing jt.and perform dummy run.Sim Ops;Cont.welding in pump room and cleanig pits. 09:00 12:00 3.00 12.00 DRILL E 20 P PJSA R/D completion sheaves from derrick.Load pipe shed w/5"DP and process.Welder building diverter section for N/U.Note;RKB to landing ring 36.50',RKB to center of annular 16.00',RKB to center of knife valve 21.00' 12:00 14:30 2.50 14.50 DRILL E 20 P PJSA Cont.loading 5"DP and HWDP to shed and process.Prep.pits to bring on mud and rock washer for drilling.Load BHA and tools to rig floor.Fabricating diverter line pup joint. 14:30 15:30 1.00 15.50 DRILL C 12 P PJSA Perform Diverter Test w/5"DP.Witnessed waived by Bob Noble. 15:30 18:00 2.50 18.00 DRILL E 20 P PJSA P/U&WU 5"DP in mousehole and rack in derrick. -- 18:00 22:30 ' 4.50 22.50 DRILL E 20 'P PJSA Cont.P/U&MIU 5"DP,HWDP,Jars,and NMFDC's and rack in derrick.Load 8.8 ppg Spud mud into pits. 22:30 00:00 1.50 24.00 DRILL E 20 P PJSA Install Diverter line pup.Circulate through MP#1 to pits. Daily Contacts _ Position Contact Name Company Title Email Office I Mobile Eni representative 'Bruce Simonson ENI Drilling Supv. 907-685-0715 _ Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CONDUCTOR 20 18.25 X-65 0.00 48.77 48.76 6/1/2011 *foil Well Name: SP28- OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#:12015 2n II Job: DRILLING Page: ge:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 258.78 257.88 246.78 5.14 48.0 103.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/849'. 24h Summary Complete N/U Diverter sys.and center stack.Flood conductor,check for leaks and PT mud lines to 3500 psi.Hold Pre-Spud meeting,M/U BHA#1 and cleanout conductor to 160'.Spud @ 0400 hrs.BROOH and M/U smart tools and orient w/Gyro Data.RIH and DrIg.f/160'-849'MD(845'ND). Operation at 07.00 Drilling @ 1,149'MD Lithology Shows Mud Weight(g/L) 1,078 4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:00 1.00 1.00 DRILL C 20 P PJSA Complete N/U of Diverter system and center stack. 0.00 01:00 01:30 0.50 1.50 DRILL E 20 P PJSA Mobilize BHA components to rig floor. 0.00 01:30 03:00 1.50 3.00 DRILL E 12 P PJSA Flood conductor,check for leaks and test surface equipment.Pressure test mud lines to 3500 psi. 0.00 03:00 03:30 0.50 3.50 DRILL E 20 P PJSA Held Pre-Spud meeting w/all parties.Discussed broaching,sloughing,diverter operations,evacuation 0.00 plan and safe area,checking equipment and proper paperwork,perform walk arounds,permitting,shallow gas and diverter operations and M/U BHA#1. 03:30 05:00 1.50 5.00 DRILL E 6 P PJSA P/U&M/U BHA#1 and RIH and cleanout conductor to 160'@ 450 gpm,400 psi,30 rpm,2-4k wob,2k 48.77 tq. 05:00 09:00 4.00 9.00 DRILL E 4 P -PJSA BROOH and P/U smart tools and orient w/Gyro Data. 4877 09:00 12:00 3.00 12.00 DRILL E 3 P PJSA RIH and Ddg.f/160'-207'MD/ND @ 500/600 gpm,650-700 psi,40 rpm,2-4k wob,2-3k tqn,2k tqf, 63.09 95k puw,96k sow,95k rotw,Max Gas 3,.33 ADT,.14 ART,.19 AST,.33 Bit/Jars. 12:00 15:30 3.50 15.50 DRILL E 3 P PJSA DrIg.f/207'-392'MD/ND @ 550 gpm,600 psi,40 rpm,2-20k wob,2-5k tqn,2k tqf,90k puw/sow/ 119.48 rotw,11.23 ECD,Max Gas 2,1.49 ADT,1.32 ART,.17 AST 1.82 Bit/Jars. 15:30 16:00 0.50 16.00 DRILL E 4 P PJSA Pump out of hole f/392'-115'@ 550 gpm,500 psi. 119.48 16:00 17:00 1.00 17.00 DRILL E 4 P PJSA P/U the remainder of BHA#2 f/115'-350',wash down to 392'@ 550 gpm,500 psi. 119.48 17:00 18:00 1.00 18.00 DRILL E 3 P PJSA DrIg.f/392'-440'MD/ND @ 550 gpm,800 psi,40 rpm,2-20k wob,3-5k tqn,2k tqf,100k puw/sow/ 134.11 rotw,10.58 ECD,Max Gas 4,21 ADT,.13 ART,.08 AST,2.03 Bit/Jars. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA Ddg.f/440'-849'MD(845'ND)@ 650 gpm,950 psi,40 rpm,10-25k wob,4k tqn,2k tqf,115k puw/ 258.78 sow/rotw,10.1 ECD,Max Gas 3,3.11 ADT,.49 ART,2.62 AST,5.14 Bit/Jars. Daily Contacts Position Contact Name Company Title Email Office 1 Mobile -Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CONDUCTOR 20 18.25 X-65 0.00 48.77 48.76 6/1/2011 Well Name: SP28- OR . Daily Report Wellbore Name: S - W3 Well Code: 29881 Date: 8/10/2015 : 3 en II Job: DRILLING Pagel of Page:1 l 1 Well Header Pennit/Concession N" Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 833.63 737.90 574.85 12.05 47.7 103.0 Daily Summary Operations 24h Forecast Drill to 2808'MD Geologists TD.BROOH as per KBM. 24h Summary Drill 16"Surface f/849'-2735'MD(2424'ND). Operation at 07.00 BROOH @ 2,453' Lithology Shows Mud Weight(g/L) 1.132.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 3 P PJSA DrIg.f/849'-1335'MD(1304'ND)@ 630 gpm,1170 psi,40 rpm,10-25k wob,6-8k tqn,3-4k tqf, 406.91 145k puw,120k sow,125k rotes,10.08 ECD,Max Gas 24,3.16 ADT,.92 ART,2.24 AST,8.30 Bit/Jars. 06:00 12:00 6.00' 12.00 DRILL E 3 P PJSA Drlg.f/1335'-1802'MD)1713'ND)@ 650 gpm,1350 psi,40 rpm,15-25k wob,6-8k lqn,3-4k tqf, 549.25 140k puw,124k sow,130k rotw,10.22 ECD,Max Gas 375,3.32 ADT,2.14 ART,1.18 AST,11.62 Bit/Jars. 12:00 18:00 6.00 18.00 DRILL E '3 P PJSA DrIg.f/1802'-2362'MD(2169'ND)@ 750 gpm,1540 psi,40 rpm,10-25k wob,6k tqn,4k tqf,150k 719.94 puw,128k sow,130k rotw,10.42 ECD,Max Gas 494,2.85 ADT,1.67 ART,1.18 AST,14.47 Bit/Jars. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA DrIg.f/2362'-2735'MD(2424'ND)@ 750 gpm,1640 psi,40 rpm,10-30k wob,5k tqn,4k tqf,150k 833.63 puw,128k sow,138k rotes,10.51 ECD,Max Gas 694,2.72 ADT,1.04 ART,1.68 AST,17.19 Bit/Jars. Daily Contacts Position Contact Name Company _ Title Email Office Mobile • Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.cam 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 dr.t.,,04. Well Name: SP28 OR Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#:1/42015 2n o Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 855.88 750.57 2225 0.48 46.4 102.0 Daily Summary Operations 24h Forecast Cont.RIH w/13 3/8"Casing as per tally.M/U Vetco hanger assy.and land on load shoulder.B/D top-Drive and R/U to circ.through Volant.Break circ.slowly and bring rate to 5 bpm while conditioning mud.Hold PJSA and prep.to cml.as per MI and SLB.Cmt as per program. 24h Summary DrIg.f/2735'-2808'TD(2462'TVD).Monitor well&downlink MWD f/BROOH.BROOH while CBU 2 stands f/2808'-2644'.Cont.BROOH as per K&M to 342'and L/D BHA and clear/clean floor.P/U and M/U GBR tools and equip.Hold PJSM,M/U 13 3/8"shoe track and check floats.Cont.to RIH w/13 3/8"casing to 1294'circulating every 10 jts.Note;@ 948'observed slight packoff while circ.@ 2 bpm,650 psi. Cleared packoff and circ.@ 1294'@ 3 bpm,100 psi. Operation at 07.00 Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) ' Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 00:30 0.50 0.50 DRILL E 3 P PJSA DrIg.f/2735'-2808'MD(2462'TVD)@ 750 gpm,1630 psi,40 rpm,10-30k wob,6-8k tqn,4-5k tqf, 855.88 155k puw,125k sow,140k rotes,10.44 ECD,Max Gas 175,.48 ADT,.31 ART,,17 AST,17.67 Bit/Jars. 00:30 01:00 0.50 1.00 DRILL E 19 P PJSA Monitor well-static.Downlink to MWD for BROOH. 855.88 01:00 02:30 1.50 2.50 DRILL E 4 P PJSA BROOH while CBU each stand f/2808'-2644'@ 850 gpm,1800 psi,60 rpm,5-6k tq,10.18 ECD,155k 855.88 puw,125k sow. 02:30 12:00 9.50 12.00 DRILL E 4 P PJSA BROOH f/2644'-684'@ 850 gpm,1400 psi,60 rpm,2-3k tq,120k puw,113k sow. 855.88 12:00 13:00 1.00 13.00 DRILL E 4 P PJSA BROOH f/684'-342'@ 850 gpm,1250 psi,60 rpm,4k tq. 855.88 13:00 16:00 3.00 16.00'DRILL E 4 P PJSA L/D BHA#2 as per SLB. 855.88 16:00 17:00 1.00 17.00 DRILL E 20 P PJSA Clear and clean rig floor. 855.88 17:00 19:00 2.00 19.00 DRILL G 20 P PJSA P/U&M/U GBR CRT tools and equipment. 855.88 i 19:00 00:00 5.00 24.00 DRILL G 4 P PJSA Hold PJSM and M/U 13 3/8"shoe track to 161'.Fill casing and check floats.Cont.to P/U&M/U 13 3/8" 855.88 68#L80 BTC casing and RIH circulating every 10 jts to 948',105k sow.Observed slight packoff and pressure y}+ increase while circulating @ 2 bpm,650 psi.Cleared packoff and cont.RIH to 1294',120k sow,3 bpm,100 psi. v Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative 'Bruce Simonson ENI `Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.corn 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 00Well Name: SP28- OR Daily Report Wellbore Name: S -NW3 III Well Code: 29881• Ret ort#: 5 8/12/2015 e n1II Job: DRILLING Page: it II 1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 855.88 750.57 0.00 103.0 Daily Summary Operations 24h Forecast Complete N/U procedures for BOPE.Loading 5"DP to pipe shed and process.P/U,M/U 5"DP and rack in derrick.Wait for AOGCC and test BOPE to specs. 24h Summary Cont.to RIH w/13 3/8"csg,M/U Vetco Mandrel Hgr.and land on load shoulder.Shoe @ 2788'and FC @ 2704'.R/U and circ./condition mud @ 2 bpm,130 psi to 5 bpm,180 psi.SLB pump 10 bbls of FW and PT lines to 500/3500 psi. Rig pump 100 bbls of 10.1 ppg MudPush and drop Btm plug.SLB pump 443 bbls of lead cmt followed w/63 bbls of tail cmt.Drop top plug and pump 10 bbls of FW.Rig displaced cmt w/ 337 bbls of spud mud,bump plug and pressure to 900 psi f/5 min.Bleed pressure and floats held.CIP @ 1400 hrs.221 bbls of cmt.returns to surface.R/D f/cmt job and GBR casing equip.N/D Diverter sys. Remove starter head and set multi-bowl well head.Test hanger neck to 2000 psi f/10 min.Set and N/U HP riser.N/U air boot bell nipple flange to Annular and prep.to lift.Note;Well SI32 shut in @ 1400 hrs. Operation at 07.00 N/U BOPE Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act Plan Oper.Descr. (mKB) 00:00 03:30 3.50 3.50 DRILL G4 P PJSA M/U and RIH w/13 3/8"68#L80 BTC casing.M/U Vetco Mandrel Hanger on landing jt.and land on load 855.88 shoulder.Total depth 2788',FC @ 2704'.160 sow,fill each It run and circulate every 10 jts. 03:30 04:00 0.50 4.00 DRILL G 20 P PJSA Blow down Top-Drive and R/U to circulate through cement line. 855.88 04:00 09:30 5.50 9.50 DRILL H7 P -PJSA Circulate and condition mud @ 2 bpm.130 psi and stage to 5 bpm,180 psi. 855.88 09:30 14:00 4.50 14.00 DRILL H7 P PJSA SLB pump 10 bbls FW and PT lines to 500/3500 psi.Rig pump 100 bbls of 10.1 ppg MudPush,drop 855.88 voti btm.plug and SLB pump 443 bbls of 10.7 ppg lead cement @ 440 psi followed w/63 bbls of 12.5 ppg tail cement @ 4.5 bpm,500 psi.Drop Top plug and kick out w/10 FW.Rig displace cement w/337 bbls of 9.35 ppg spud mud @ 5 bpm,270 psi,slow rate to 2 bpm,400 psi and bump plug,increase pressure to 900 psi and 411"-" hold for 5 min.Bleed pressure and floats held.CIP @ 1400 hrs.221 bbls of cement returns to surface. Note; Well 5I32 was shut in @ 1400 hrs. 14:00 16:30 2.50 16.50 DRILL H 20P PJSA Blow down and R/D from cement job.R/D and L/D GBR casing equipment,UD landing jt,flush and 855.88 clean drip pan and diverter. 16:30 18:00 • 1.50 18.00 DRILL C 20P PJSA N/D Diverter system. 855.88 18:00 23:00 5.00' 23.00 DRILL C 20P PJSA Remove Vetco starter head.Prep.and set Vetco multi-bowl well head.Test hanger neck seals to 2000 855.88 psi 0 10 min.Set and N/U Hi-Pressure riser. 23:00 00:00 1.00 24.00 DRILL C 20P PJSA N/U air boot bell nipple flange to annular.Prep.to lift. 855.88 Daily Contacts Position Contact Name Company Title Email Office Mobile - Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 iiii* Well Name: SP28 OR Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ref ort#:36 015 2n II Job: DRILLING Page: ge:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 855.88 750.57 0.00 104.0 Daily Summary Operations 24h Forecast Cont.to rack back DP and prep for BOPE testing.Jeff Jones will witness.B/D&R/D from testing.P/U BHA#3 and RIH to TOFC and test casing.Drill out shoe track. 24h Summary N/U BOPE,clean pits and load 5"DP in shed.Set test plug.P/U,M/U and rack DP in derrick. Operation at 07.00 .P/U,M/U and rack 5"DP in Derrick. Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 11:00 11.00 11.00 DRILL C 20 P PJSA N/U BOPE.Cleaning pits and loading 5"DP to pipe shed and process. 855.88 11:00 12:00 1.00 12.00 DRILL C 20 P PJSA Open up doors on blind rams and prep for installation of rams. 855.88 12:00 13:00 1.00 13.00 DRILL C 20 .P PJSA Install blind rams. 855.88 13:00 14:00 1.00 14.00 DRILL E 20 P PJSA Service and inspect crown,top-drive,blocks and hook. 855.88 14:00 15:00 1.00 15.00 DRILL C 20 P PJSA Prep and install pitcher nipple. 855.88 15:00 -16:00 1.00 16.00 DRILL C 20 P PJSA Vetco set test plug. 855.88 16:00 17:00 1.00 17.00 DRILL E 20 P PJSA P/U,M/U and rack back 5"DP in derrick. 855.88 17:00 18:00 1.00 18.00 DRILL C 20 P PJSA Install new flowline. 855.88 18:00 00:00 6.00 24.00 DRILL E 20 P PJSA Cont.to M/U DP. 855.88 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Dolling Supv. - 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDolling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 0� Well Name: SP28SOR • Daily Report Wellbore Name: -NW3 Well Code: 29881• Ret ort 8/14/2015#: 2n° Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB •MD @ Report Time(m...TVD @ Report Time(m... 855.88 750.57 0.00 102.0 Daily Summary Operations 24h Forecast DrIg.shoe track and 20'of old rathole.CBU and monitor well.Pull 5 stds and monitor well. POOH and L/D BHA#3.M/U BHA#4 and RIH and drill 20'of new hole to 2828'.Displace well to LSND mud,pull into casing and perform LOT/FIT.Clean surface mud system,slip&cut drlg.line.Drill ahead as per SLB. 24h Summary Complete P/U of 5"DP(115 stds).Prep and test BOPE as per AOGCC specs.Witnessed by Jeff Jones.R/D from BOP testing and R/U and test 13 3/8"csg.to 2600 psi f/30 charted min.P/U and M/U BHA#3 and single into hole to 2623'.Wash down to TOFC @ 2704'.Drill shoe track f/2704'-2780, Operation at 07.00 Drill Shoe Track/Rat Hole,Pull 5 Stands,Monitor hole.Pump Dry Job. Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 05:30 5.50 5.50 DRILL E 20 P PJSA Complete P/U of 115 stds.of 5"DP. 855.88 05:30 06:30 1.00' 6.50 DRILL 'C 20 P PJSA L/D mousehole.Precharge accumulator and apply pressure to BOPE.Function test NCR's,Rams and 855.88 Annular. 06:30 07:30 1.00 7.50 DRILL C 20 P PJSA Install 5"test it,flood stack and perform body test. 855.88 07:30 11:30 4.00 11.50 DRILL 'C 12 P PJSA Test BOPE as per AOGCC specs.Witnessed by Jeff Jones. 855.88 11:30 12:00 0.50 12.00 DRILL C 20 P PJSA Blow down and rig down from testing.Place well control equipment back into service. 855.88 12:00 13:00 1.00 13.00 DRILL C 20 P PJSA Pull test plug and install wear bushing. 855.88 / Z 13:00 14:30 1.50 14.50 DRILL E 12 P PJSA R/U test equipment and test 13 3/8"casing to 0 si f/30 charted min.Pump 3.8 bbls @ 1 bpm with 855.88 f.-5- - 3.8 bbls bleed back.B/D&R/D test equipment. 14:30 15:00 0.50 15.00 DRILL E 20 P PJSA P/U BHA equipment to floor. 855.88 15:00 16:00 - 1.00 16.00 DRILL 'E 25 P PJSA Service draw works,top-drive,iron roughneck and adjust brakes. 855.88 16:00 17:00 1.00 17.00 DRILL 'E 4 P PJSA WU BHA#3 as per SLB to 195',90k puw/sow. 855.88 17:00 21:00 4.00' 21.00 DRILL 'E 4 P PJSA Single in the hole w/5"DP from pipe shed 6 195'-2623',125k puw,110k sow. 855.88 21:00 '21:30 0.50 21.50 DRILL E 4 P PJSA Perform SPR's.Wash down f/2623'-2704'(TO Float Collar)@ 290 gpm,200 psi,30 rpm,4k tq,125k 855.88 puw,100k sow,120k rotw. 21:30 00:00 2.50 24.00 DRILL E 3 P PJSA Drilling Shoe Track f/2704'-2780'©520 gpm.570 psi,80 rpm,6-8k wob,4k tq,125k puw,110k sow, 855.88 120k rotw. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 Well Name: SP28- OR Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#5 $0015 2n ii Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 960.12 802.77 104.24 2.49 41.9 104.0 Daily Summary Operations 24h Forecast C/O saver sub and DP.RIH to 3150'and drill ahead as per SLB. 24h Summary Drlg.13 3/8"shoe track to 2808',CBU X 1.5 and POOH and UD BHA#3.M/U BHA#4,RIH perform SHT and cont to 2774'.Wash down to 2808'and drill 20'of new hole to 2828'.Displace well to 9.25 ppg LSND mud,pull up,cut and slip 64'of drlg line.CBU and balance mud wt.Perform LOT to 12.58 EMW.Drill ahead f/2828'-3150'MD.Note:While M/U connection,had problems w/M/U.POOH to C/O bad saver sub and DP connection. Operation at 07.00 Drilling Ahead Intermediate @ 3,243'MD Lithology Shows Mud Weight(gIL) 1,114.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:30 1.50 1.50 DRILL E 3 P PJSA Orig.13 3/8"shoe track f/2780'-2808'@ 515 gpm,550 psi,80 rpm,6-8K wob,6-8K tq,130k puw, 855.88 120k sow,122k rotw. 01:30 02:00 0.50 2.00 DRILL E 7 P PJSA CBU X 1.5 @ 515 gpm,550 psi,60 rpm,4-5k tq. 855.88 02:00 02:30 0.50 2.50 DRILL E 7 P PJSA Obtain SPR @ 2587'MD(2329'TVD)w/9.3 MW;#1/#2/#3 @ 30-40,@ 40-60.Monitor well-static. 855.88 02:30 05:00 2.50 5.00 DRILL E 4 P PJSA POOH f/2808'-195',78k puw,75k sow. 855.88 05:00 05:30 0.50 5.50 DRILL E 4 P PJSA L/D BHA#3 as per SLB. 855.88 05:30 06:00 0.50 6.00 DRILL E 20 P PJSA Clear and clean rig floor. 855.88 06:00 07:00 1.00 7.00 DRILL E 20 P PJSA Mobilize BHA#4 to rig Floor. 855.88 07:00 09:00 2.00 9.00 DRILL E 4 P PJSA M/U BHA#4 as per SLB to 351'. 855.88 09:00 09:30 0.50' 9.50 DRILL E 4 P PJSA RIH 351'-1560'w/5"DP,128k puw,110k sow. 855.88 09:30 10:00 0.50 10.00 DRILL E 12 P PJSA Perform Shallow Hole Test @ 587 gpm,790 psi. 855.88 10:00 11:00 1.00 11.00 DRILL E 4 P PJSA RIH 5 1560'-2592',140k puw,128k sow. 855.88 11:00 12:00 1.00 12.00 DRILL E 4 P PJSA Wash and ream f/2592'-2774'@ 660 gpm,1070 psi,30 rpm,5-6k lq. 855.88 12:00 13:00 1.00 13.00 DRILL E 4 P PJSA SLB down link tools and wash down f/2774'-2808'. Drill 20'of new hole to 2828'@ 700 gpm,1200 psi, 861.97 70 rpm,4-6k wob,4-8k tq. 13:00 14:30 1.50 14.50 DRILL E 7 P PJSA for Displace well w/9.25 ppg LSND mud.Pump 50 bbls Hi-Vis spacer followed w/400 bbls of 9.25 ppg 861.97 LSND mud. 14:30 16:30 2.00 16.50 DRILL E 25P PJSA Slip 8 olt.4 Cut 64'of� na..iRspect and adjust brakes.Cleaning all surface mud equipment. 861.97 16:30 17:30 1.00 17.50 DRILL E 7 P PJSA CBU @ 45•.pm,475 psi unti/mud.( balanced to 9.25 ppg. 861.97 i,_ 17:30 18:30 1.00 18.50 DRILL E 9 P PJSA R/U and.erform LOT to 12.58 E . " pumping 1.6 bbls,485 psi with 1.5 bbls bleed back. 861.97 La 18:30 23:00 4.50 23.00 DRILL E 3 P PJSA SPR @ •'a B)w/9.25 MW;#1 @ 30-80,@ 40-100,#21#3 @ 30-60,@ 40-80.DrIg 960.12 Z f/2828'-3150'MD(2641'TVD)@ 800 gpm,1240 psi,100-190 rpm,6-8k wob,5-6k tqn,3k tqf,140k puw, 127k sow,132k rotw,9.93 ECD,Max Gas 34,2.49 ADT,2,49 Bit,20.16 Jars.Note:While M/U connection, had problems w/saver sub to DP connection. 23:00 00:00 1.00 24.00 DRILL E 4 TRO4 PJSA Monitor well-static.POOH f/3150'-2775'to CIO bad saver sub/DP,140k puw,125k sow. 960.12 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.cam 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 Well Name: SP28- OR IP Daily Report imoilWellbore Name: S NW3 Well Code: 29881• Ret ort#: 98/16/2015 II Page:Job: DRILLINGRep Date: II 1 of 1 Well Header Permit/Concession N" Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 1,615.74 861.92 655.62 2.49 263.3 106.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/5301'. 24h Summary C/O Saver sub and 3 jts.of 5"DP.RIH to 3150'and drill ahead to 5301'MD(2829'TVD).Note;Control drilling to aide in fluid losses.28 bbls Daily fluid losses. Operation at 07.00 Drilling 12 1/4"Intermediate @ 5,725' Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 02:00 2.00 2.00-DRILL E 25 TRO4 PJSA C/O saver sub on Top-Drive. 960.12 02:00 03:00 1.00 3.00 DRILL E 4 TRO4 PJSA RIH f/2775'-3150',140k puw,125k sow.C/O 3 jts.of 5"DP while RIH. 960.12 03:00 i 06:00 i 3.00 6.00 i DRILL E 3 P PJSA Drig.f/3150'-3430'MD(2720'TVD)@ 900 gpm,1610 psi,140-190 rpm,6-10k wob,6-8k tqn,3-4k 1,045 46 tqf,150k puw,132k sow,142k rotw,9.93 ECD,Max Gas 32,1.09 ADT,3.58 Bit,21.25 Jam. 06:00 i 12:00 6.00 12.00 DRILL E 3P PJSA DrIg.f/3430'-3990'MD(2784'ND)@ 900 gpm,1670 psi,140-190 rpm,6-10k wob,6-8k tqn,4-5k 1,216.15 tqf,152k puw,122k sow,139k rotw,9.93 ECD,Max Gas 27,3.43 ADT,7.01 Bit,24.68 Jars.SPR @ 3805'MD (2778'TVD)w/9.25 MW;#1/#2/#3 @ 30-100,@ 40-120. 12:00 18:00 6.00 18.00-DRILL E 3P PJSA DrIg.f/3990'-4737'MD(2808'ND)@ 900 gpm,1820 psi,140-190 rpm,6-8k wob,7-8k tqn,4-5k 1,443.84 tqf,150k puw,125k sow,136k rotw,10.17 ECD,Max Gas 54,4.23 ADT,1124 Bit,28.91 Jars.Monitor well- slight falling. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA DrIg.6 4737'-5301'MD(2829'TVD)@ 900 gpm,1920 psi,140-190 rpm,8-10 wob,7-10k tqn,4-6k 1,615.74 tqf,150k puw,120k sow,137k row,1027 ECD,Max Gas 48,3.1 AOT,14.34 Bit,32.01 Jars.Monitor well- slight falling.28 bbls Toudy fluid losses.SPR @ 4828'MD(2812'TVD)w/9.35 MW;#1 @ 30-140,@ 40- 170,#2/#3 @ 30-120,@ 40-150. Daily Contacts Position Contact Name Company Title _ Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig 15@doyondrilling.corn 907-685-0716 Last Casing Seat Cas.Type OD(In) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 13 3/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgflcm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 ivoliiht. Well Name: SP28- OR Daily Report Wellbore Name: S -NW3 Well Code: 29881 RetP ort#:710 e Page: 15 e II Job: DRILLING 1 of 1 Well Header PermiVConcession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 2,343.91 887.51 728.17 15.61 46.6 106.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/7690'. 24h Summary Drill 12 1/4"Intermediate f/5301'-7690'MD(2913'ND)as per SLB.51 bbls Daily Fluid Losses. Operation at 07.00 Drilling 12 1/4"Intermediate @ 8,190' Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time 'Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E '3 'P PJSA DrIg.f/5301'-5858'MD(2846'ND)@ 900 gpm,1950 psi,140-190 rpm,6-10k wob,9-10k tqn,5-6k 1,785.52 tqf,155k puw,120k sow,137k rotw,10.48 ECD,Max Gas 42,3.93 ADT,18.24 Bit,35.91 Jars.Monitor well- static.SPR @ 5858'MD(2846'ND)w/9.4 MW;#2/#3 @ 30-210,@ 40-250. • 06:00 12:00 6.00 12.00 DRILL E 3 P PJSA DrIg.f/5858'-6325'MD(2862'1VD)@ 900 gpm,2280 psi,140-190 rpm,6-10k wob,8-10k tqn,5-6k 1,927.86 tqf,165k puw,110k sow,140k rotw,10.46 ECD,Max Gas 13,4.51 ADT,22.75 Bit,40.42 Jars.23 bbls Tourly Fluid Losses 12:00 18:00 6.00 18.00 DRILL E 3P PJSA DrIg.f/6325'-7071'MD(2890'ND)@ 900 gpm,2090 psi,140-190 rpm,6-12k wob 11-13k tqn,7k 2,155.24 tqf,160k puw,108k sow,138k rotw,10.37 ECD,Max Gas 37,3.3 ADT,26.05 Bit,43.72 Jars.SPR @ 6884' MD(2884'TVD)w/9.45 MW;#1 @ 30-250,@ 40-290,#2/#3 @ 30-230.@ 40-260. 15:00 00:00 6.00 24.00 DRILL E 3P PJSA DrIg.f/7071'-7690'MD(2913'TVD)@ 900 gpm,2060 psi,140-190 rpm,6-8k wob,10k tqn,7k tqf, 2,343.91 160k puw,110k sow,138k rotw,10.31 ECD,Max Gas 18,3.87 ADT,29.92 Bit,47.59 Jars.28 bbls Tourly Fluid Losses. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.corn 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.corn 907-980-7545 907-980-7545 Eni representative Dano Smith ENI _ HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 ircioN Well Name: SP28- OR ID Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 8/18/2015 • Report#: 11 2n° Job: DRILLING Page:1 of 1 Well Header PermiVConcession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 3,036.72 911.29 692.81 16.08 43.1 112.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/9963'to Est.TD @ 16,410'. 24h Summary Drill from 7690'-9963'MD(2990'ND). Operation at 07.00 Drilling 12 1/4"Intermediate @ 10,525'MD Lithology Shows Mud Weight(g/L) 1,114.4 Time Log Start End Cum Dur End Depth Time _ Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 3P PJSA DrIg.f/7690'-8379'MD(2935'ND)@ 900 gpm.2250 psi,140-190 rpm,8-10k wob,11-12k tqn,7- 2,553.92 8k tqf,165k puw,109k sow,140k rotw,10.56 ECD,Max Gas 12,3.62 ADT,33.54 Bit,51.21 Jars. 06:00 12:00 6.00 12.00 DRILL E 3 P PJSA DrIg.f/8379'-8939'MD(2949'ND)@ 900 gpm,2300 psi,140-190 rpm,6-10k wob,12-13k tqn,7- 2,724.61 8k tqf, 185k puw,N/A sow,141k rotw,10.32 ECD,Max Gas 9,3.82 ADT,37.36 Bit,55.03 Jars.26 bbls Tourly Fluid Losses.SPR @ 8939'MD(2949'ND)w/9.3 MW;#1/82/83 @ 30-210,@ 40-250. 12:00 18:00 6.00 18.00 DRILL E 3 P PJSA DrIg.f/8939'-9452'MD(2970'ND)@ 900 gpm,2321 psi,140-190 rpm,6-12k wob,12-13k tqn,8- 2,880.97 9k tqf,170k puw,100k sow,139k rotes,10.44 ECD,Max Gas 13,4.83 ADT,42.19 Bit,59.86 Jars. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA Drig.f/9452'-9963'MD(2990'ND)@ 900 gpm,2340 psi,140-190 rpm,6-10k wob,13-14k tqn,8- 3,036.72 9k tqf,170k puw,108k sow,141k rotw,10.27 ECD,Max Gas 11,3.81 ADT,46.00 Bit,63.67 Jars.SPR @ 9872'MD(2986'TVD)w/9.3 MW;#1/82 @ 30-240,@ 40-260. Daily Contacts Position Contact Name I Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Sups. - 907-685-0715 Eni representative Russ Wimmer ENI Drilling Sups. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgflcm') 8/15/2015 Leak Off 849.78 747.18 LSND 1.108.4 34.1 1,564.8 116.9 Well Name: SP28 OR • Daily Report Wellbore Name: S NW3 Well Code: 29881 Date: 8/19/2015 • Report#: 12 2n ti Job: DRILLING Page:1 of 1 Well Header Permit/Concession N" Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 3,735.02 935.02 698.30 15.34 45.5 112.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/12,254'to Est.TD @ 16,410'. 24h Summary Drill 12 1/4"Intermediate f/9963'-12,254'MD(3069'TVD). __ _ Operation at 07.00 Drilling 12 1/4"Intermediate @ 12,656'MD. Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Our End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06.00 6.00 6.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/9,963'to 10,713'MD(3,019 TVD)900 GPM,2,450 PSI,140-190 RPM, 3.265.32 TQN 11-12K,TQF 8-9K,WOB 6-10K,HST 170K,SLK 102,ROT 140K,ECD 10.43 ppg W/9.3 ppg MW.Max Gas 24 units.ADT 3.98,Bit Hrs 49.98,Jar Hrs 67.65.Monitor well,static. 06:00 12.00 6.00 12.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/10,713'to 11,180'MD(3,033 TVD)900 GPM,2,550 PSI,140-190 3,407.66 RPM,TON 12-13K,TOP 8-9K,WOB 8-10K,HST 170K,SLK 105,ROT 141 K,ECD 10.49 ppg W/9.25 ppg MW.Max Gas 11 units.ADT 3.67,Bit Hrs 53.65,Jar Hrs 71.32.Monitor well,static.47 bbls Tourly Fluid Losses. SPR @ 10,899'MD(3,025'TVD)W/9.25 ppg MW MP#1 30-200,40-250 MP#2 30-200,40-250 MP#3 30-200,40-250 12:00 18:00 6.00 18.00 DRILL E 3 P PJSA Dig.f/11,180'-11,833'MD(3053'TVD)@ 900 gpm,2650 psi,140-190 rpm,6-8k wob,12-13k tqn,9 3,606.70 -10k tqf,175k puw,95k sow,139k rotw,10.48 ECD,Max Gas 16,3.68 ADT,57.33 Bit,75.00 Jars.Monitor well-static. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA DrIg.f/11,833'-12,254'MD(3069'TVD)@ 900 gpm,2670 psi,140-190 rpm,8-12k wob,14k tqn,9- 3,735.02 10k tqf,175k puw,100k sow,142k rotw,10.60 ECD,Max Gas 18,4.01 ADT,61.34 Bit,79.01 Jars.Monitor well-Slight falling.11 bbls Tourly Fluid Losses.SPR @ 11,833'MD(3053'TVD)w/9.3 MW;#1/#2/#3 @ 30- 260,@ 40-300. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 13 3/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1.108.4 34.1 1.564.8 116.9 Well Name: SP28-0 OR Daily Report Wellbore Name: S NW3 Well Code: 29881• ReDat ort#:013015 2n II Job: DRILLING p �I �I Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 4,346.45 1,025.85 611.43 17.09 35.8 113.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/14,260'to Est.TO @ 16,410'. 24h Summary PJSA Drill 12.25"Intermediate hole F/12,254'to 14,260'MD(3,366'TVD)900 GPM,3,080 PSI,140-190 RPM,TQN 14-16K,TQF 9-11K,WOB 8-15K,HST 195K,SLK 98,ROT 150K,ECD 10.94 ppg W/9.4 ppg MW.Max Gas 99 units.ADT 17.09,Bit Hrs 78.43,Jar His 96.10.Monitor well,static.160 bbls Daily Fluid Losses. Operation at 07.00 Drilling 12 1/4"Intermediate @ 14,520'MD. Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr)' (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 0000 06:00 6.00' 6.00 DRILL E 3 •P PJSA Drill 12.25"Intermediate hole F/12,254'to 12,860'MD(3,103'TVD)900 GPM,2,870 PSI,140-190 3,919.73 RPM,TON 14-15K,TQF 9-10K,WOB 10-12K,HST 178K,SLK 97,ROT 141 K,ECD 10.76 ppg W/9.4 ppg MW.Max Gas 24 units.ADT 3.79,Bit Hrs 65.13,Jar Hrs 82.80.Monitor well,static. SPR @ 12,858'MD(3,103'TVD)W/9.4 ppg MVV MP#1 30-320,40-360 MP#3 30-320,40-360 0600 12:00 6.00 12.00 DRILL E 3 'P PJSA Drill 12.25"Intermediate hole F/12,860'to 13,420'MD(3,206'TVD)900 GPM,2,880 PSI,140-190 4,09042 RPM,TQN 15-16K,TQF 10-11K,WOB 8-12K,HST 190K,SLK 98,ROT 145K,ECD 10.89 ppg W/9.4 ppg MW.Max Gas 27 units.ADT 4.35,Bit Hrs 69.48,Jar Hrs 87.15.Monitor well,static.97 bbls Tourly Fluid Losses. 12.00 18:00 6.00 18.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/13,420'to 13,795'MD(3,278'TVD)900 GPM,2,855 PSI,140-190 4,204.72 RPM,TON 14-15K,TQF 9K,WOB 8-15K,HST 185K,SLK 102,ROT 146K,ECD 10.63 ppg W/9.3 ppg MW. Max Gas 33 units.ADT 4.36,Bit Hrs 73.84,Jar Hrs 91.51.Monitor well,static. 18.00 '00:00 6.00' 24.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/13,795'to 14,260'MD(3,366'TVD)900 GPM,3,080 PSI,140-190 4,346.45 RPM,TQN 15-16K,TQF 10-11K,WOB 8-15K,HST 195K,SLK 98,ROT 150K,ECD 10.94 ppg W/9.4 ppg MW.Max Gas 99 units.ADT 4.59,Bit Hrs 78.43,Jar Hrs 96.10.Monitor well,static.66 bbls Tourly Fluid Losses. SPR-MP#1 30 SPM 340 psi,40 SPM 380 psi, MP#2 30 SPM 340 PSI,40 SPM 380 psi, MP#3 30 SPM 340 PSI,40 SPM 380 PSI @ MD=13,885',TVD=3,294',W/9.4#MW W/53 Vis Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Andrea Lazzari ENI Drilling Eng. Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling 'Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1.564.8 116.9 Well Name: SP28-0 OR Daily Report Wellbore Name: SNW3 Well Code: 29881 Date: 8/21/2015 • Report#: 14 2n o Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 4,961.23 1,095.55 614.78 16.31 37.7 114.0 Daily Summary Operations 24h Forecast Drill ahead as per SLB f/16,277'to Est.TD @ 16,410'.BROOH as per K&M. 24h Summary PJSA Drill 12.25"Intermediate hole F/14,260'to 16,277'MD(3,594'TVD)750-890 GPM,2,460-3,400 PSI,140-190 RPM,TQN 16-18K,TQF 10-12K,WOB 10-19K,HST 195K,SLK 95-100,ROT 146-149K,ECD 11.46 ppg W/9.7 ppg MW.Max Gas 462 units.ADT 16.3,Bit Hrs 94.74,Jar Hrs 112.41 174 bbls Daily Fluid Losses. Operation at 07.00 Drilling 12 1/4"Intermediate hole @ 16,460'MD Lithology Shows Mud Weight(g/L) 1.150.3 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 3P PJSA Drill 12.25"Intermediate hole F/14,260'to 14,802'MD(3,469'TVD)750 GPM,2,460 PSI,140-190 4,511.65 RPM,TQN 17K,TQF 11-12K,WOB 10-15K,HST 195K,SLK 100,ROT 149K,ECD 10.84 ppg W/9.45 ppg MW.Max Gas 140 units.ADT 5.14,Bit Hrs 83.57,Jar Hrs 101.24.Monitor well,static. 06:00 12:00 6.00 12.00 DRILL E -3P PJSA Drill 12.25"Intermediate hole F1 14,802'to 15,287'MD(3,531'TVD)750 GPM,2,560 PSI,140 RPM, 4,659.48 TON 16K,TQF 10K,WOB 15-18K,HST 192K,SLK 98,ROT 149K,ECD 10.98 ppg W/9.5 ppg MW.Max Gas 280 units.ADT 3.06,Bit Hrs 86.63,Jar Hrs 104.3.Monitor well,static.104 bbls Tautly Fluid Losses. SPR-@ MD=14,820',TVD=3,472',W/9.45#MW W/55 Vis MP#1 30 SPM 400 psi,40 SPM 440 psi, MP#2 30 SPM 400 PSI,40 SPM 440 psi, MP#3 30 SPM 400 PSI,40 SPM 440 PSI 12:00 18:00 6.00- 18.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/15,287'to 15,846'MD(3,571'TVD)890 GPM,3,330 PSI,140-190 4,829.86 RPM,TON 17-18K,TQF 11-12K,WOB 18-19K,HST 195K,SLK 98,ROT 148K,ECD 11.47 ppg W/9.7 ppg MW.Max Gas 462 units.ADT 3.95,Bit Hrs 90.58,Jar Hrs 108.25 Monitor well,static. 18:00 00:00 6.00 24.00 DRILL E 3 P PJSA Drill 12.25"Intermediate hole F/15,846'to 16,277'MD(3,594'TVD)885 GPM,3,400 PSI,140-190 4,961.23 RPM,TON 18K,TQF 12K,WOB 12-15K,HST 195K,SLK 95,ROT 146K,ECD 11.46 ppg W/9.7 ppg MW. Max Gas 105 units.ADT 4.16,Bit Hrs 94.74,Jar Hrs 112.41 Monitor well,static.70 bbls Toady Fluid Losses. SPR-@ MD=15,846',TVD=3,572',W/9.75#MW W/57 Vis MP#1 30 SPM 440 psi,40 SPM 500 psi, MP#2 30 SPM 440 PSI,40 SPM 500 psi, MP#3 30 SPM 440 PSI,40 SPM 500 PSI Daily Contacts Position Contact Name Company Title Email Office Mobile • Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Andrea Lazzari ENI Driiling Eng. Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyonl5@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-9807545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg..,E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 1169 Well Name: SP28-*OR Daily Report vitis Wellbore Name: S NW3 Well Code: 29881 • Date: 8/22/2015 • Report#: 15 efl n Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 86.87 2.26 38.4 116.0 Daily Summary Operations 24h Forecast BROOH f/11,649'as per K&M schedule 24h Summary Drill ahead 12 1/4"Intermediate Hole F/16,277'to 16,562'(3,615'NO),880 GPM,3,340 PSI,140-190 RPM,WOB 12-18K,TRN 18-19K,TQF 12K,HST 146K,SLK 90K,ROT 198K.ECD 11.49 ppg W/9.7 ppg MW-Circ.BU 2X @ 900 GPM,3,550 PSI,120 RPM,TRQ 14K,F/16,562'to 16,410'MD.-BROOH Fl 16,410'to 11,649'900 GPM,120 RPM. Operation at 07.00 BROOH @ 10,146'MD Lithology Shows Mud Weight(gIL) 1,150.3 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 02:30 2.50 2.50 DRILL E 3P Drill ahead 12 1/4"Intermediate Hole F/16,277'to 16,458'(3,609'TVD),880 gpm,3,340 PSI,140-190 RPM, 5,016.40 WOB 12-18K,TRN 18-19K,TQF 12K HST 146K,SLK 90K,ROT 198K.ECD 11.55 ppg W/97 ppg MW. Dynamic losses around 5 bph. 02:30 03:00 0.50 3.00 DRILL E 25 P PJSA Service rig. 5,016.40 03:00 04:30 1.50 4.50 DRILL E 3P Drill ahead 12 1/4"Intermediate Hole F/16,458'to 16,562'(3,615'ND),880 GPM,3,340 PSI,140-190 RPM, 5,048.10 WOB 12-18K,TRN 18-19K,TOE 12K,HST 146K,SLK 90K,ROT 198K.ECD 11.49 ppg W/9.7 ppg MW.Max Gas 529 units.Fluid lost 51 bbl during drilling.Dynamic losses around 3-5 bph.Dumping and diluting to control mud weight. 04:30 05:00 0.50 5.00 DRILL E 11 P Send down link and shoot survey as per Schlumberger MWD.Perform SPR.Monitor well,static. 5,048.10 05:00 08:30 3.50 8.50 DRILL E 6P Perform SPR.Monitor well,static.Circ.BU 2X @ 900 GPM,3,550 PSI,120 RPM,TRQ 14K,F/16,562'to 5,048.10 16,410'MD. SPR @ 16,562'MD(3,615'ND)W/9.7 ppg MW MP#1 30-440,40-500 MP#2 30-440,40-500 MP#3 30-440,40-500 08:30 12:00 3.50 12.00 DRILL E 6 P BROOH as per K&M schedule F/16,410'to 15,663'MD 900 GPM,3,400 PSI,120 RPM,TRO 14K,HST 5,048.10 200K,SLK 95K,ROT 151K ECD 11.29 ppg W/9.7 ppg MW.Lost 42 bbl during BROOH. 12:00 18:00 6.00 18.00 DRILL E 6P BROOH as per K&M schedule F/15,663'to 13,474'MD 900 GPM,3,100 PSI,120 RPM,TRO 12-13K,HST 5,048.10 240K,SLK n.a.,ROT 141K.ECD 11.40 ppg W/9.7 ppg MW. 18:00 00:00 6.00 24.00 DRILL E 6P BROOH as per K&M schedule F/13,474'to 11,649'MD 900 GPM,3,000 PSI,120 RPM,TRQ 11-12K,HST 5,048.10 185K,SLK 85K,ROT 132K.ECD 11.20 ppg W/9.7 ppg MW.Lost 13 bbl during BROOH. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Andrea Lazzari ENI Drilling Eng. Em representative Vance Dale ENI Matis Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Dulling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(In) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 13 3/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1.108.4 34.1 1,564.8 116.9 Well Name: SP28-0 OR Daily Report Wellbore Name: S NW3 Well Code: 29881 • Date: 8/2312015 • Report#: 16 en 0 Job: DRILLING Page:1 of 1 Well Header Permit/Concession N' Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 116.0 Daily Summary Operations 24h Forecast BROOH f/4,740'MD;L/D BHA#4;R/U GBR equipment;RIH 9-5/8"csg 24h Summary PJSA BROOH as per K&M schedule F/11,649'to 4,740'MD 900 GPM,1,820-2,290 PSI,120 RPM,TRQ 5-14K,HST 145-170K,SLK 90-126K,ROT 126-139K.ECD 10.3-10.9 ppg.Encountered tight hole w/slight pack off @ 5,310 and 5,050' Total loss for day 65 bbl. Operation at 07.00 BROOH @ 4,010'MD Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum DurEnd Depth Time Time Dur(hr)_ (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 6P PJSA BROOH as per K&M schedule F/11,649'to 9,128'MD 900 GPM,2,290 PSI,120 RPM,TRQ 10K,HST 5,048.10 170K,SLK 90K,ROT 136K.ECD 10.5 ppg W/9.5 ppg MW. 06:00 12:00 6.00 12.00 DRILL E 6P PJSA BROOH as per K&M schedule F/-9,128'to 7,074'MD 900 GPM,2,050 PSI,120 RPM,TRQ 10K,HST 5,048.10 158K,SLK 105K,ROT 139K.ECD 10.4 ppg W/9.5 ppg MW.Total loss for tour 53 bbl. • 12:00 18:00 6.00 18.00 DRILL E 6P PJSA BROOH as per K&M schedule F/7,074'to 5,576'MD 900 GPM,1,820 PSI,120 RPM,TRQ 10-14K, 5,048.10 HST 145K,SLK 90K,ROT 126K.ECD 10.5-10.8 ppg W/9.4 ppg MW. • 18:00 00:00 6.00 24.00 DRILL E 6 P PJSA BROOH as per K&M schedule F/5,576'to 4,740'MD 900 GPM,1,890 PSI,120 RPM,TRQ 5-7K,HST 5,048.10 147K,SLK 126K,ROT 139K.ECD 10.3-10.9 ppg W/9.4 ppg MW.Encountered tight hole w/slight pack off @ 5,310 and 5,050'Ream stands twice as per K&M rep onsite;Total loss for tour 12 bbl. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Andrea Lazzari ENI Drilling Eng. Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 74721 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 or._ Well Name: SP28-100R Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 8/24/2015 • Report#: 17 2n 11 Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 120.0 Daily Summary Operations 24h Forecast RIH 9.625"Csg 24h Summary BROOH as per K&M schedule F/4,740'to 1,658'MD.900 GPM,1,370 PSI,120 RPM,TRQ 2-6K,HST 128-150K,SLK 120-125K,ROT 125-137K.Monitor well,static.POOH on elevators F/1,658'to 444'MD. PJSM with all essential personnel for laying down BHA.Lay down 12.25"BHA#4 as per Sclumberger DD and MWD W/Co Rep onsite.Bit Grade 5-3-BT-C-X-IN-CT-TD.Clean and clean rig floor.C/O Rams F/ 3.5"X 6"Variable to 9 5/8"Csg.Rams.Pull Wear Bushing and install test plug as per Vetco Grey Rep onsite.R/O test Equip.and test 9 5/8"Rams to 250 low and 3,500 PSI high.Pull test plug and install modified Wear Bushing W.Vetco Grey Rep onsite. ID 12.31".R/U GBR CRT and Equip.as per GBR Rep onsite. Operation at 07.00 RIH W/9 5/8"Shoe track Lithology Shows Mud Weight(g/L) 1,114.4 Time Log Start End Cum Dur End Depth _ Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) ..00:00 '06:00 6.00 6.00 DRILL E 6P PJSA BROOH as per K&M schedule F/4,740'to 3,200'MD 900 GPM,1,670 PSI,120 RPM,TRQ 4K,HST 5,048.10 150K,SLK 120K,ROT 137K.ECD 10.4 ppg W/9.4 ppg MW. 06.00 10:00 4.00 10.00 DRILL E 6 P PJSA BROOH as per K&M schedule F/3,200'to 1,938'MD 900 GPM,1,450 PSI,80-120 RPM,TRQ 2-3K, 5,048.10 HST 128K,SLK 125K,ROT 139K.ECD 10.2 ppg W/9.4 ppg Tourly Losses 60 bbls • 10:00 12:30 2.50 12.50 DRILL -E 7 P Circulate B/U 06 f/1,938'to1,658'MD 900 GPM,1,370 PSI,80 RPM 3K TRQ when the hole unloaded 5,048.10 12:30 14:00 1.50 14.00 DRILL E 4 P PJSM,Monitor well(static),POOH f/1,658'to 1,444'MD HST=90K SLK=90K(found 15 jots worn out) 5,048.10 - 14:00 16:30 I 2.50 16.50 DRILL E 4 P PJSM,L/D BHA#4 as per SLB,ENI Co.Rep onsite Bit grade:5-3-BT-C-X-IN-CT-TD 5,048.10 16:30 17:30 1.00 17.50 DRILL E 20P Clean and clear rig floor of all BHA tools and equipment 5,048.10 • 17:30 21:00 3.50 21.00 DRILL C 5 P PJSM,R/U and wash stack,pull wear ring as per Vetco Grey Rep,change Upper Rams f/3.506"VBR If 5,048.10 ir-IA-I 9.625"Fixed,set test plug as per Vetco Grey Rep • 21:00 22:00 1.00 22.00 DRILL C12 P PJSM,R/U and test 9.625"rams 250 PS low,3500 psi high(charted).Test good. 5,048.10 /' R/D test equipment ./f 22:00 22:30 0.50 22.50 DRILL C 5 P Pull test plug,install modified wear ring as per Vetco Grey Rep/ID 12.3" 5,048.10 J 22:30 00:00 1.50 24.00 DRILL G 20 P R/U Volant tool to run 9.625"Csg 5,048.10 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Andrea Lazzari ENI Drilling Eng. Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyonl5@enipetroleum.cow 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig 15@doyondnlling.corn 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade - Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 133/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 0. Well Name: SP28-00R • Daily Report Wellbore Name: SP28-NW3 Well Code: 29881 Date: 8/25/2015 • Report#: 18 2n° Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator • Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) FOB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 115.0 Daily Summary Operations 24h Forecast Cont.to rotate at 40 RPM in hole W/9.625"Csg.Fl 9,391'MD at 20 fUmin.to 16,552'MD. 24h Summary R/U GBR CRT,Casing Bails,4'Ext Bails,350 Ton Spyder,Strap Tongs as per GBR Reps onsite.WU X/O to FOSV.SIMOPS Transfer LSND F/Pits to Mud Plant.PJSM W/all essential personnel.P/U M/U 9 5/8" Shoe Track and Bakerloc.Check Floats.(Good(Cont.to RIH 9.625",40#,L-80 Csg as per tally and K&M running schedule to 1,055'MD.RIH 9.625",40#,L-80,HYD 563 as per K&M schedule and tally F/1,055'to 3,814'MD.Obtain rotating parameters at Shoe 2,788'MD.20 RPM,TRQ 4K,40 RPM,TRQ 5K,SLK 75K,no losses.RIH 9.625"as per K&M schedule and tally F/3,814'to 6,843'MD.Started rotating at 5,346'MD SLK 75K,ROT 90K,40 RPM,TRQ 7-9K.Rotate in hole 9.625"as per K&M schedule and tally F/6,843'to 9,391'MD.SLK 70-75K,40 RPM,ROT 88K,TRQ 7-10K.Reduce running speed @ 8,000'MD to 20 fUmin.No losses to formation. Operation at 07.00 Rotate in hole W/9.625"Csg @ 10,460'MD. Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 02:30 2.50 2.50 DRILL G 20 P PJSA R/U GBR CRT,Casing Bails,4'Ext Bails,350 Ton Spyder,Strap Tongs as per GBR Reps onsite.M/U 5,048.10 X/O to FOSV.SIMOPS Transfer LSND F/Pits to Mud Plant. 02:30 06:00 3.50 6.00 DRILL G 4 P PJSM W/all essential personnel.P/U M/U 9 5/8"Shoe Track and Bakedoc.Check Floats.(Good)Cont.to RIH 5,048.10 9.625",40#,L-80 Csg as per tally and K&M running schedule to 1,055'MD. 06:00 12:00 6.00 12.00 DRILL G 4 P PJSA RIH 9.625",40#,L-80,HYD 563 as per K&M schedule and tally F/1,055'to 3,814'MD.Obtain rotating 5,048.10 parameters at Shoe 2,788'MD.20 RPM,TRQ 4K,40 RPM,TRQ 5K,SLK 75K,no losses. 12:00 18:00 6.00 18.00 DRILL G 4 P PJSA RIH 9.625"as per K&M schedule and tally F/3,814'to 6,843'MD.Started rotating at 5,346'MD SLK 5,048.10 75K,ROT 90K,40 RPM,TRQ 7-9K. ,('- 18:00 00:00 6.00 24.00 DRILL G 4 P PJSA Rotate in hole 9.635"as per K&M schedule and tally F/6,843'to 9,391'MD.SLK 70-75K,40 RPM,ROT 5,048.10 88K,TRO 7-10K.Reduce running speed @ 8,000'MD to 20 ft/min.No losses to formation. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date CASING 13 3/8 12.42 L-80 0.00 849.84 747.21 8/11/2015 Last Leakoff Test Test Date •Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(glL) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,1084 34.1 1564.8 116.9 Well Name: SP28-0 OR Daily Report rt* Wellbore Name: SP28-NW3 Well Code: 29881 • Date: 8/26/2015 • Report#: 19 en ii Job: DRILLING Page:1 of 1 Well Header Perrnit/Concession N' Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 5,048.10 1,101.79 0.00 113.0 Daily Summary Operations 24h Forecast R/D GBR Volant CRT.R/U Schlumberger cement head as per Schlumberger Rep onsite.Fill 9.625"Csg as per MI Swaco plan.Break Circ.and condition mud as per MI Swaco to<20YP for cement job. 24h Summary Rotate in hole 9.625"as per K&M schedule and tally F/9,391'to 16,552'MD.SLK 65-72K,40 RPM,ROT 81K,TRQ 13-14K.Running speed 20 fl/min F/9,391'to 11,000',10 ft/min F/11,000'to 15,000'and 5-10 ft/min F/15,000'to 16,552'MD.Remove 350 Ton Spyder and install rotary bushing.Minor losses about 8 bbl FI 11,334'to 12,744'MD. Operation at 07.00 Fill 9.625"Csg.as per MI Swaco plan forward. Lithology Shows Mud Weight(gIL) 1,144.3 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL G 4 P PJSA Rotate in hole 9.625"as per K&M schedule and tally F/9,391'to 11,334'MD.SLK 70K,40 RPM,ROT 5.048.10 88K,TRQ 11K.Reduce running speed to 20 ft/min to 11,000'MD,decrease running speed to 10 ft/min F/11,000'MD.No losses to formation. 06:00 12:00 6.00 12.00 DRILL G 4 P PJSA Rotate in hole 9.625"as per K&M schedule and tally F/11,334'to 12,744'MD.SLK 75K,40 RPM,ROT 5,048.10 88K,TRQ 12.5K.Running speed at 10 ft/min.Calculated displacement 284 bbl,actual 276 bbl.Lost 8 bbl. 12.00 18:00 6.00 18.00 DRILL G 4 P PJSA Rotate in hole 9.625"as per K&M schedule and tally F/12,744'to 14,519'MD,SLK 65-72K,40 RPM, 5,048.10 ROT 79K,TRO 12-13K.Running speed at 10 ft/min.No losses. 18:00 00:00 6.00 24.00 DRILL G 4 P PJSA Rotate in hole 9.625"as per K&M schedule and tally F/14,519'to 16,552'MD.SLK 65-72K,40 RPM, 5,048.10 ROT 81K,TRQ 13-14K.Running to 5-10 ft/min F/15,000'.Remove 350 Ton Spyder and install rotary bushing. No losses. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5.045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 i- Well Name: SP28- OR • Daily Report Wellbore Name: SP -NW3 Date: 15 Well Code: 29881 Report#:T 20 2n ii Job: DRILLING Page:1 of 1 Well Header PermiVConcession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(mlhr) POB MD @ Report Time(m...TVD @ Report Time(m... 5,048.10 1,10179 0.00 108.0 Daily Summary Operations 24h Forecast Cont.to put cement in place @ 5 bpm W/9.3 ppg mud weight.Bump plug and check floats.Perform infectivity test 20 bbl in 13 3/8"X 9 5/8"Annulus.N/D BOPE and set emergency slips.N/U BOPE.Freeze protect annulus W/LRS.Test BOPE. 24h Summary R/D Volant GBR CRT and bail extensions as per GNR Rep onsite.R/U Cement Head as per Schlumberger Rep onsite and lines to fill 9.625"Csg.Fill 9.625"Csg as per MI Swaco plan @ 4 bpm letting air and mud swap for 10 Min @ 625 bbl,937 bbl and 1,200 bbl away.Top off 3 times when confirmed full.R/D fill lines.Load cement plugs as per Schlumberger Rep onsite,witnessed by Co Rep onsite.R/U cement lines. Break Circ.@ 0.5 bpm 330 PSI,stage up to 2.5 bpm 470 PSI.Cont.to Circ.and condition mud @ 2.5 bpm 470 PSI.Stage up pump rate to 3.5 bpm @ 360 PSI.stage up to 5 bpm 430 PSI.SIMOPS Load 4.5" D.P.in Pipe Shed.PJSM W/all essential personnel.Press.test cement lines to 500 PSI low and 3,000 PSI high.Rig pump 100 bbl 10.0 ppg Mud Push @ 5 bpm.Drop bottom plug and Schlumberger pump 190 bbl 12.5 ppg Lead Cement @ 6 bpm ICP 300 PSI,FCP 0.Pump 51 bbl 15.8 ppg Tail Cement @ 4 bpm ICP 0,FCP 0.Drop top plug and kick out with 10 bbl H2O.Line and rig pump 9.3 ppg mud weight. Operation at 07.00 Perform injedivity test and N/D BOPE. Lithology Shows Mud Weight(gIL) 1.114.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 00:30 0.50 0.50 DRILL G 20 P PJSA R/D Volant GBR CRT and bail extestions as per GNR Rep onsite.R/U Cement Head as per 5,048.10 Schlumberger Rep onsite and lines to fill 9625"Csg. 00:30 07:30 7.00 7.50 DRILL G 9 P PJSA Fill 9.625"Csg as per MI Swaco plan @ 4 bpm letting air and mud swap for 10 Min @ 625 bbl,937 bbl 5,048.10 and 1,200 bbl away.Top off 3 times when confirmed full. 07:30 08:00 0.50 8.00 DRILL H 20 P PJSA R/D fill lines.Load cement plugs as per Schlumberger Rep onsite,witnessed by Co Rep onsite.R/U 5,048.10 cement lines. 08:00 12:00 4.00 12.00 DRILL H 8 P PJSA Break Circ.@ 0.5 bpm 330 PSI,stage up to 2.5 bpm 470 PSI.No losses. 5,048.10 12:00 18:00 6.00 18.00 DRILL H 8 P PJSM Cont.to Circ.and condition mud @ 2.5 bpm 470 PSI.Stage up pump rate to 3.5 bpm @ 360 PSI. 5,048.10 18:00 21:30 3.50 21.50 DRILL H 8 P PJSA Cont.Circ.and condition as per MI Swaco at 3.5 bpm 360 PSI,stage up to 5 bpm 430 PSI.SIMOPS 5,048.10 ✓ Load 4.5"D.P.in Pipe Shed. 21:30 00:00 2.50 24.00 DRILL H 9 P PJSM W/all essential personnel.Press.test cement lines to 500 PSI low and 3,000 PSI high.Rig pump 100 5,048.10 bbl 10.0 ppg Mud Push @ 5 bpm.Drop bottom plug and Schlumberger pump 190 bbl 12.5 ppg Lead Cement @ 6 bpm ICP 300 PSI,FCP 0.Pump 51 bbl 15.8 ppg Tail Cement @ 4 bpm ICP 0,FCP 0.Drop top plug and kick out with 10 bbl H2O.Line and rig pump 93 ppg mud weight. Daily Contacts Position Contact Name Company Title Email Office Mobile j Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.corn 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgflcm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 Well Name: SP28-N OR • Daily Report Wellbore Name: S NW3 Well Code: 29881• Ret ort#:821 8/215 2n ii Job: DRILLINGp Page:1 of 1 Well Header Permit/Concession N' Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 107.0 Daily Summary Operations 24h Forecast Slip and cut drilling line.Replace bolt on TDS-8 Rail.L/D 5"D.P.and P/U M/U 4.5"D.P.from Pipe Shed. 24h Summary Put cement in place W/9.3 ppg LSND @ 6 bpm,ICP 0.Slow pumps down to 2 bpm @ 1,210 bbl away.FCP 430 PSI.Plug bumped @ 1,237.3 bbl,Press.up to 930 PSI and hold for 5 Min.checking floats.(Good) CIP @ 03:20 AM,Perform 30 bbl injectivity test in 13 3/8"X 9 5/8"Annulus,break over 1 bpm @ 534 PSI.Bleed off and blow down lines.R/D Cement head as per Schlumberger.C/O Bails to drilling bails and 5" Elevators.P/U 5"Stand D.P.M/U FOSV,displace mud from 9 5/8"Csg.R/D and stand back 5"D.P.Install9 5/8"Elevators.Blow down Choke and Kill lines.N/D Kill,Choke and Hole Fill lines,drain.Split Multi Bowl and raise BOPE and High Press.Riser as per Vetco Grey Rep onsite.Pull 100K over string weight to 200K.Set emergency slips.R/U WACH's cutter and cut 9 5/8"Csg.as per Vetco Grey Rep onsite.L/D Landing Joint and cut 9 5/8"Csg.Cut length 4.11'Dress Csg and set Pack Off as per Vetco Grey Rep onsite.N/U BOPE,Kill,Choke and flow lines.Test Pack off to 2,472 PSI as per Vetco Grey Rep onsite. (Witnessed)C/O Pipe Rams F/9 5/8"to 3.5"X 6"Variables.R/U to test BOPE.Install test plug as per Vetco Grey Rep onsite.M/U pumping sub to TDS-8.M/U FOSV/Dart,Pumping Sub and all test Equip.Flood Stack and Choke Manifold with H20.Test BOPE:.AOGCC witnessed waived by Bob Noble 8-27-15.SIMOPS Freeze Protect 13 3/8"X 9 5/8"Annulus W/110 bbl Diesel @ 1.5 bpm.SIP 500 PSI.Pull test plug, drain stack and set Wear Bushing as per Vetco Grey Rep onsite.Blow down R/D BOPE test Equip.PJSM Test 9 5/8"Csg to 3,000 PSI for 30 Min.all charted.Witnessed by Co Rep onsite. Operation at 07.00 L/D 5"D.P.to Pipe Shed. Lithology Shows Mud Weight(g/L) 1,114.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 03:30 3.50 3.50 DRILL H 9P PJSA Put cement in place W/9.3 ppg LSND @ 6 bpm,ICP 0.Slow pumps down to 2 bpm @ 1,210 bbl away. 5,048.10 FCP 430 PSI.Plug bumped @ 1,237.3 bbl,Press.up to 930 PSI and hold for 5 Min.checking floats.(Good) CIP @ 03:20 AM. 03:30 04:30 1.00 4.50 DRILL H 11 P PJSA Perform 30 bbl injectivity test in 13 3/8"X 9 5/8"Annulus,break over 1 bpm @ 534 PSI.Bleed off and 5,048.10 blow down lines. 04:30 05:30 1.00 5.50 DRILL G 5P PJSA R/D Cement head as per Schlumberger.C/O Bails to drilling bails and 5"Elevators.P/U 5"Stand D.P. 5,048.10 M/U FOSV,displace mud from 9 5/8"Csg.R/D and stand back 5"D.P.Install 9 5/8"Elevators.Blow down Choke and Kill lines. 05:30 07:30 2.00 7.50 DRILL C 5 P PJSA N/D Kill,Choke and Hole Fill lines,drain.Split Multi Bowl and raise BOPE and High Press.Riser as per 5,048.10 Vetco Grey Rep onsite. 0730 11:00 3.50 11.00 DRILL C -5 P PJSA Pull 100K over string weight to 200K.Set emergency slips,R/U WACH's cutter and cut 9 5/8"Csg.as 5,048.10 - per Vetco Grey Rep onsite.L/D Landing Joint and cut 9 5/8"Csg.Cut length 4.11'Dress Csg and set Pack Off as per Vetco Grey Rep onsite. 11:00 12:00 1.00 12.00 DRILL C 5P PJSA N/U BOPE,Kill,Choke and flow lines.Test Pack off to 2,472 PSI as per Vetco Grey Rep onsite. 5,048.10 (Witnessed) • 12:00 13:30 1.50 13.50 DRILL C 5 P PJSA C/O Pipe Rams F/9 5/8"to 3.5"X 6"Variables. 5,048.10 13:30 14:30 1.00 14.50 BRILL C1 P PJSA R/U to test BOPE.Install test plug as per Vetco Grey Rep onsite.M/U pumping sub to TDS-8.M/U 5,048.10 FOSV/Dart,Pumping Sub and all test Equip.Flood Stack and Choke Manifold with H2O. 14.30 21:00 6.50' 21.00 DRILL C 12P PJSM Test BOPE:Annular Preventer 250 PSI low and 2,500 PSI high.Choke Valves 1-14,Upper and Lower 5,048.10 Rams,TT525&NC 46 Dart&FOSV,Manual Choke&Kill,NCR Choke&Kill,Kill Line Demco,Upper and Lower BOP W/5"&4,5"Test Joint to 250 PSI low and 3,500 PSI high for 5 Min.Test Manual and Super Choke to 1,500 PSI.All charted.Perform Koomey test:Start Press.Manifold 1,550 PSI,System 2,900 PSI, Annular 525 PSI,after function:Manifold 1,475 PSI,System 1,500 PSI,Annular 550 PSI.200 PSI increase in 32 Sec.Full charge 184 Sec. 5 Nitrogen average 2,475 PSI.AOGCC witnessed waived by Bob Noble 8-27- 15.SIMOPS Freeze Protect 13 3/8"X 9 5/8"Annulus W/110 bbl Diesel @ 1.5 bpm.SIP 500 PSI. 21:00 22:00 1.001 22.00 DRILL C 5P PJSA Pull test plug,drain stack and set Wear Bushing as per Vetco Grey Rep onsite. 5,048.10 22:00 23:00 1.00• 23.00 DRILL C 5P PJSA Blow down R/D BORE test Equip. 5,048.10 23:00 00:00 1.00 I 24.00 DRILL G 12P PJSM Test 9 5/8"Csg to 3,000 PSI for 30 Min.all charted.Witnessed by Co Rep onsite. 5,048.10 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener I ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale 'ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 805/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 Well Name: SP28- OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#: 22 8/29/2015 2n1 Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 108.0 Daily Summary Operations 24h Forecast Cont.to P/U M/U 4.5"D.P.F/Pipe Shed and rack back in Derrick.170 stands total.P/U M/U 8.75"BHA#5 as per Schlumberger.Single in hole BHA W/4.5"D.P. 24h Summary R/D testing Equip.Blow down lines.C/O bolts on Torque Tube.Remove Bell Nipple Flange,Bell Nipple and Flow Line from BOPE.Adjust Drawwork brakes.Cut and slip drilling line.Adjust Drawwork brakes. Stand back stand of D.P.Install Mouse Hole in Rotary Table. UD 5"D.P.to Pipe Shed.121 stands total.SIMOPS Load 700 bbl 9.35 ppg Faze Pro from Mud Plant to rig pits.Install Bell Nipple Flange,Bell Nipple and Flow Line.Inspect and adjust brakes.on Drawworks.C/O handling Equip.F/5"to 4.5".P/U M/U 4.5"D.P.from Pipe Shed and rack back in Derrick.Perform CAT 3 Derrick inspection by NOV third party Rep onsite.Cont.to P/U M/U 4.5"D.P.from Pipe Shed and rack back in Derrick.37 stands. Operation at 07.00 P/U M/U 4.5"D.P.F/Pipe Shed and rack back in Derrick. Lithology Shows Mud Weight(gIL) 1,114.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan _ Oper.Deur. (mKB) 00:00... 00:30 0.50 0.50 DRILL G 5 P PJSA R/D testing Equip.Blow down lines. 5,048.10 00:30 01:30 1.00 1.50 DRILL E 25 P PJSA C/O bolts on Torque Tube.Remove Bell Nipple Flange,Bell Nipple and Flow Line from BOPE.Adjust 5,048.10 Drawwork brakes. 01:30 03:00 1.50 3.00 DRILL E 25 P PJSA Cut and slip drilling line.Adjust Drawwork brakes.Stand back stand of D.P.Install Mouse Hole in Rotary 5,048.10 Table. 03:00 06:00 3.00 6.00 DRILL E 20 P PJSA L/D 38 stands of 5"D.P.to Pipe Shed. 5,048.10 • 06:00 12:00 6.00 12.00 DRILL E 20 P PJSA Cont.to L/D 5"D.P.to Pipe Shed.96 stands total.SIMOPS Load 700 bbl 9.35 ppg Faze Pro from Mud 5,048.10 Plant to rig pits. 12:00 14:30 2.50 14.50 DRILL E 20 P PJSM Cont.to L/D 5"D.P.to Pipe Shed.Total 25 stands. 5,048.10 • 14:30 18:00 3.50 18.00 DRILL E 25 P PJSM Install Bell Nipple Flange,Bell Nipple and Flow Line.Inspect and adjust brakes.on Drawworks. 5,048.10 18:00 20:00 2.00 20.00 DRILL E 20 P PJSM C/O handling Equip.F/5"to 4.5".P/U M/U 4.5"D.P.from Pipe Shed and rack back in Derrick. 5,048.10 20:00 21:00 1.00 21.00 DRILL E 25 P Perform CAT 3 Derrick inspection by NOV third party Rep onsite. 5,048.10 21:00 00:00 3.00 24.00 DRILL E 20 P PJSA Cont.to P/U M/U 4.5"D.P.from Pipe Shed and rack back in Derrick.37 stands. 5,048.10 Daily Contacts Position Contact Name Company Title Email , Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyonl5@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgflcm') 8/15/2015 Leak Off 849.78 747.18 LSND 1,108.4 34.1 1,564.8 116.9 pool Well Name: SP28 OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#:023 15 2n° Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB•Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 109.0 Daily Summary Operations 24h Forecast Cont.to single BHA#5 in hole with 4.5"D.P.to-4,000'MD.RIH W/4.5"D.P.from Derrick to top of plug.Displace LSND to 9.35 ppg Faze Pro as per MI Swaco plan.Drill out Shoe Track and 20'of new hole to 16,582'MD. 24h Summary P/U M/U 4.5"D.P.F/Pipe Shed and rack back 5 stands in Derrick,170 stands total. Clear rig floor.PJSM C/O Saver Sub on TDS-8 to 4.5"NC46.SIMOPS Load Pipe Shed W/120 joints of 4.5"D.P.and process. PJSM W/all essential personnel for picking up BHA#5.P/U M/U 8.75"Hycalog,Xceed675,PeriScope 675,ILS,TeleScope,adnVISlON,NM Stab NM FC,FS,X/O,HWDP and 7"Hydraulic Jars to 362'MD,CO Rep onsite.PJSM P/U M/U 4.5"D.P.from Piep Shed and single in hole BHA#5 F/362'to 1,789'MD.Shallow hole test Schlumberger MWD 450 GPM,820 PSI.(Good)Cont.to single in hole to 2,739'MD.SLK 122K. Operation at 07.00 RIH BHA#5 W/4.5"D.P.@ 7,261'MD. Lithology Shows Mud Weight(gIL) 1,114.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) -00:00 12:00 12.00 12.00 DRILL E 20 P PJSA P/U M/U 4.5"D.P.F/Pipe Shed and rack back in Derrick,165 stands total. 5,048.10 12:00 13:00 ' 1.00 13.00 DRILL E '20 P 'PJSA P/U M/U 4.5"D.P.F/Pipe Shed and rack back 5 stands in Derrick,170 stands total. Clear rig floor. 5,048.10 13:00 16:00 3.00 16.00 DRILL E 20 P 'PJSM C/O Saver Sub on TDS-8 to 4.5"NC46.SIMOPS Load Pipe Shed W/120 joints of 4.5"D.P.and 5,048.10 process. 16:00 20:00 4.00 20.00 DRILL E 4 P PJSM W/all essential personnel for picking up BHA#5.P/U M/U 8.75"Hycalog,Xceed675,PeriScope 675, 5,048.10 ILS,TeleScope,adnVISION,NM Stab NM FC,FS,X/O,HWDP and 7"Hydraulic Jars to 362'MD Co Rep onsite. 20:00 00:00 4.00 24.00 DRILL E 4 P PJSM P/U M/U 4.5"D.P.from Piep Shed and single in hole BHA#5 F/362'to 1,789'MD.Shallow hole test 5,048.10 Schlumberger MWD 450 GPM,820 PSI.(Good)Cont.to single in hole to 2,739'MD.SLK 122K. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale EM Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Dulling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat _ Cas.Type OD(in) ID(in) Grade - Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5.045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 8/15/2015 Leak Off 849.78 747.18 LSND 1.108.4 34.1 1,564.8 116.9 #1� Well Name: SP28 OR ID Daily Report Wellbore Name: S NW3 Well Code: 29881 Date: 8/31/2015 n• Report#: 24 2n II Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m( 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOVON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 5,048.10 1,101.79 0.00 113.0 Daily Summary Operations 24h Forecast Cut and slip drilling line.Clean surface Equip.of inner face.Drill out Shoe Track and 20'of new hole to 16,582'MD.Perform FIT to 13.0 ppg EMW or LOT.Drill 8.75"Production hole as per well plan. 24h Summary P/U M/U 4.5"D.P.F/Pipe Shed and single in hole BHA#5 F/2,739'to 4,164'MD.HST 140K,SLK 110K.RIH 4.5"D.P.F/Derrick F/4,164'to 6,721'MD.HST 152K,SLK 75K.Rotate in hole F/6,721'to 9,852'MD. 40 RPM,TRQ 14.5K,HST 190K,ROT 128K.Rotate in hole F/9,852'to 13,174'MD.40 RPM,TRQ 21K,HST 215K,ROT 135K.Circ.130 bbl LO TRQ pill out of Bit.380 GPM,1,600 PSI.Rotate in hole F/13,174' to 13,364'MD 40 RPM,TRQ 18K,HST 210K,ROT 135K.Rotate in hole F/13,364'to 15,520'MD 40 RPM,TRQ 23K,SLK 90K.Mix and Circ.8%776 Lube Pill for high reaming torque @ 400 GPM,1,840 PSI. Rotate in hole F/15,520'to 16,305'MD 40 RPM,TRQ 24K,SLK 95K.Wash and ream F/16,305'and tag plugs @ 16,468'MD.Set 10K down,300 GPM,1,220 PSI,40 RPM,TRQ 24K.PJSM W/all essential personnel.Displace 9.25 ppg LSND W/9.4 ppg Faze Pro as per MI Swaco plan forward.Pump 42 bbl Hi Vis Spacer @ 5 bpm 690 PSI,43 bbl LVT Spacer @ 7 bpm 1,020 PSI.Chase W/1,180 bbl 9.4 ppg Faze Pro @ 7 bpm 1,660 PSI.Weight out 9.25 ppg when shut down.HST 250 K,ROT 140K,SLK N/A,TRQ 12K.Prep to cut and slip drilling line.SIMOPS Clean surface Equip.of inner face in Pits. Operation at 07.00 Drill out Shoe Track @ 16,558'MD. Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:00 1.00 1.00 DRILL E 4 P PJSA P/U M/U 4.5"D.P.F/Pipe Shed and single in hole BHA#5 F/2,739'to 4,164'MD.HST 140K,SLK 5,048.10 110K. 01:00 02:00 1.00 2.00 DRILL E 4 P PJSA RIH 4.5"D.P.F/Derrick F/4,164'to 6,721'MD.HST 152K,SLK 75K. 5,048.10 02:00 06:00 4.00 6.00 DRILL E 6 P PJSA Rotate in hole F/6,721'to 9,652'MD.40 RPM,TRQ 14,0K,HST 190K,ROT 128K. 5,048.10 06:00 10:30 4.50 10.50 DRILL E 6 P PJSA Rotate in hole F/9,852'to 13,174'MD.40 RPM,TRO 21K,HST 215K,ROT 135K. 5,048.10 10:30 11:30 1.00 11.50 DRILL E 9 P PJSA Circ.130 bbl LO TRO pill out of Bit.380 GPM,1,600 PSI. 5,048.10 11:30 12:00 0.50 12.00 DRILL E 6 P PJSA Rotate in hole F/13,174'to 13,364'MD 40 RPM,TRQ 18K,HST 210K,ROT 135K. 5,048.10 12:00 15:30 3.50 15.50 DRILL E 6 P PJSA Rotate in hole F/13,364'to 15,520'MD 40 RPM,TRQ 23K,SLK 90K. 5,048.10 15:30 16:30 1.00 16.50 DRILL E 9 P Mix and Circ.8%776 Lube Pill for high reaming torque @ 400 GPM,1,840 PSI. 5,048.10 16:30 17:30 1.00 17.50 DRILL E 6 P PJSA Rotate in hole F/15,520'to 16,305'MD 40 RPM,TRQ 24K,SLK 95K. 5,048.10 17:30 18:00 0.50 18.00 DRILL E 6 P Wash and ream F/16,305'and tag plugs @ 16,468'MD.Set 10K down,300 GPM,1,220 PSI,40 RPM,TRQ 5,048.10 24K. 18:00 23:30 5.50 23.50 DRILL E 9 'P PJSM W/all essential personnel.Displace 9.25 ppg LSND W/9.4 ppg Faze Pro as per MI Swaco plan 5,048.10 forward.Pump 42 bbl Hi Vis Spacer @ 5 bpm 690 PSI,43 bbl LVT Spacer @ 7 bpm 1,020 PSI.Chase W/ 1,180 bbl 9.4 ppg Faze Pro @ 7 bpm 1,660 PSI.Weight out 9.25 ppg when shut down.HST 250 K,ROT 140K,SLK N/A,TRQ 12K. 23:30 00:00 0.50 24.00 DRILL E 20 'P PJSA Prep to cut and slip drilling line.SIMOPS Clean surface Equip.of inner face in Pits. 5,048.10 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 -715-6434 Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715 Eni representative Vance Dale ENI Malls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.corn 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpedror@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1.101 64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 9/1/2015 .Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 Well Name: SP28 OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 9/1/2015 • Report#: 25 2n ii Job: DRILLING Page:1 of 1 Well Header Pennit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 5,460.80 1,110.92 412.70 10.28 40.1 112.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"production hole to 25344'MD. 24h Summary Cut and slip drilling line,service rig,Drill shoe track and 20'new hole to 16582'.Preform fit test,13.0 EMW,Continue to drill F/16582'T/17916'. Operation at 07.00 Drilling ahead at 18,392'MD Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:30 1.50' 1.50 DRILL E 20 P PJSM,cutand slip drilling line 60'(7 wraps),Adjust drawworks brakes,service lop drive blocks,hook and 5,048.10 crown. 01:30 03:15 1.75 3.25 DRILL E 4 P PJSM,RIH T/16468'.Drill out cement from shoe track and rathole to 16562'.80rpm,14-17k tq,400gpm, ' 5,048.10 2400psi,6-10 WOB,HST-210K,RT-139K. 03:15 03:30 0.25 3.50 DRILL E 3 P Drill 20'new hole F/16562'T/16582'.80RPM,12k TO,Bit hours.15,jar hours, 5,054.19 03:30 05:00 1.50 5.00 DRILL E 7 P Circulate bottoms at up to obtain even 9.4mw in and out.Stand back one stand of drill pipeT/16497'.500 gpm, 5,054.19 3230 psi,14.5k-tq, 05:00 06:30 1.50 6.50 DRILL E 12 P PJSM,Rig up and ft test.677 psi,3615 TVD,13.0 EMW.rig down test equipment. 5,054.19 06:30 07:30 1.00 7.50 DRILL 'E '5 P PJSM,Service rig.Open door on pipe handler grabber and replace bolts and safety wire on saver sub guide 5,054.19 ring. 07:30 12:00 4.50 12.00 DRILL E '3 P PJSM,Drill F/16582'T/16968'.500 gpm,3650 psi,80/100 rpm,16/18 Tq,6K WOB,9.45 MW,max gas 503 5,171.85 units.ECD-11.03 12:00 18:00 6.00 18.00 DRILL E 3 P Drill F/16968'T/17500'.Max gas 726 units.3652 TVD,13/18K TO,P/U-210K,ROT-135K,ECD-11.15,MW 5,334.00 9.45ppg. 18:00 00:00 6.00 24.00 DRILL E 3 P Drill F/17500'T/17916',MAX GAS 783 units. 5,460.80 TQ-13/18K,P/U-210,ROT-135K, ECD-11.23/9.45MW. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv 'SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Mike Grubb ENI Drilling Sopor. 907-685-0715 Eni representative Vance Dale ENI Matls Coordinator Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722 Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.cam 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 1.47 5.045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1.126.4 47.8 1.560.2 171.9 Well Name: SP28- OR • Daily Report 001 Wellbore Name: S NW3 Well Code: 29881 Date: 9/2/2015 • Report#: 26 en 1 Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(mlhr) FOB MD @ Report Time(m...TVD @ Report Time(m.. 6,116.73 1,087.38 655.93 15.35 42.7 114.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"production hole F/20068' 24h Summary Drill 8 3/4"production hole F/17916'T/20068' Operation at 07.00 Drilling ahead at 20,240'MD Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 0600 6.00 6.00 DRILL E i 3 P i PJSM,Drill F/17916'T/18582' Max gas 783 units i 5,663 79 RPM-120/150,PSI-3800,GPM-500,WOB-6/10K, HST-220K,ROT-136K,MW-9.4,ECD-11.7. ADT-3.6, 0 mud losses 06:00 12:00 6.00 12.00 DRILL E 3 P PJSM,Drill F/18582'T/19056',Max gas 282 units 5.808.27 RPM-120/180,PSI-3860,GPM-500,WOB-6/12K. HST-230K,ROT-133K,MW-9.4,ECD-11.7, ADT-3.81,TQ-19/20K, 0 mud losses 12:00 18.00 i 6.00 18.00 DRILL E 3 P PJSM,Drill F/18582'T/19056',Max gas 282 units 6.039.61 RPM-120/180,PSI-3860,GPM-500,WOB-6/12K. HST-230K,ROT-133K,MW-9.4,ECD-11.7, ADT-3.31, TQ-18/21K 0 mud losses 18:00 00:00 i 6.00 24.00 DRILL E 3 P PJSM,Drill F/19815'T/20068',Max gas 789 units 6,116.73 RPM-120/180,PSI-3860,GPM-500,WOB-6/12K. HST-210K,ROT-135K,MW-9.45,ECD-11.67, ADT-4.63,TQ-12/20K,TVD-3569' 0 mud losses Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener i ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Mike Grubb ENI Drilling Sopor. 907-685-0715 Eni representative Vance Dale ENI Malls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Jeremey Decker ENI Expediter eniexpedilor@gmail.com 907-980-7545 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 9 5/8 8.84 L-80 -1.47 5.045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1.560.2 171.9 0 Well Name: SP28-I OR Daily Report Wellbore Name: S NW3 Well Code: 29881• Ret ort#: 27 9/3/2015 2n n Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 6,429.15 1,087.07 312.42 15.56 20.1 110.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"production hole at 21,093' 24h Summary Drill 8 3/4"production hole F/20068'T/20290'.Back ream one stand and rack back,monitor well.Change saver sub from 4 1/2"to 5"(tapered string).Continue drilling F/20290'T/21093'. Operation at 07.00 Drilling ahead at 21,385'. Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 04:30 4.50 4.50 DRILL -E 3 P PJSM,Drill F/20068'T20290',TVD-3567' 6.184.39 GPM-495,PSI-3930,RPM-120/180,TQ-18/21 K WOB-6/12K,HST-210K,ROT-137K,Max gas 938 ECD-11.83,MW-9.4,ADT-4.2 04:30 05:00 0.50 5.00 DRILL E 7 P Circulate while backreming stand.Stand back one stand of 4.5".Monitor well,static.Preform Torque stick test 6,184.39 after 10 min,Torque 16k breakover.16K torque at50 rpm.0 mud losses 05:00 06:00 1.00 6.00 DRILL E 25 P PJSM,Change out saver sub From 4.5"drill pipe thread/NC-46 to 5"1TT525, 6,184.39 06:00 12:00 6.00 12.00 DRILL E 3 P PJSM,Drill F/20290'T/20356',TVD-3566' 6,204.51 GPM-495,PSI-3850,RPM-120/180,TO-1922K WOB-6/15K,HST-210K,ROT-137K,Max gas 717 ECD-11.61,MW-9.4,ADT-4.66 0 mud losses 12:00 18:00 6.00 18.00 DRILL E 3 P PJSM,Drill F/20356'T20726',TVD-3559' 6,317 28 GPM-495,PSI-3930,RPM-120/180,TO-19/20K WOB-2/14K,HST-212K,ROT-133K,Max gas 679 ECD-11.56,MW-9.4,ADT-4.13 0 mud losses 18:00 00:00 6.00 24.00 DRILL E 3 P 'PJSM,Drill F20726'T21093',TVD-3568' 6,429.15 GPM-485,PSI-3920,RPM-120/180,TQ-18/20K WOB-6/10K,HST-215K,ROT-133K,Max gas 950 ECD-11.65,MW-9.4,ADT-2.57 0 mud losses Daily Contacts Position I Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Mike Grubb ENI Drilling Supvr. 907-685-0715 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg.. E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 Well Name: SP28- OR Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 9/4/2015 • Report#: 28 2n ll Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 6,828 43 1,092.25 399.29 15.50 25.8 108.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"production hole at 22403' 24h Summary Drill 8 3/4"production hole F/21,093'T/22403'. Operation at 07.00 Drilling ahead at 22.580'MD Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 0000 06:00 6.00 6.00 DRILL E 3 P PJSM,Drill F/21093'1/214451 TVD-3562'. 6,536.44 ADT-4.53,P/U-218,ROT-135,TQ-21K, ECD-11.78/9.4MW,Max gas-675.0 mud losses 06.00 12:00 6.00 12.00 DRILL E 3 P PJSM,Drill F/21445'T21827',TVD-3565', 6,652.87 ADT-3.01,P/U-240,ROT-135,TQ-19K, ECD-11.78/9.4MW,Max gas-163,0 mud losses 12'00 18:00 6.00 18.00 DRILL E 3 P PJSM,Drill F/21,827'T/22,130',TVD-3578'. 6,745 22 ADT-4.35,P/U-230,ROT-135,TQ-21K, ECD-11.91/9.4MW.Max gas-841,0 mud losses 18.00 00:00 6.00 24.00 DRILL E 3 P PJSM,Drill F/2122,130'T/22,403',TVD-3585', 6,828.43 ADT-3.61,P/U-220,ROT-139,TQ-18/20K, ECD-11.83/9.4MW,Max gas-994,0 mud losses Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Em representative Mike Grubb ENI Drilling Sups, 907-685-0715 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg..,E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 Well Name: SP28- OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#:12915 Page:Job: DRILLING Rep Date: 1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,120.49 1,088.51 292.06 10.76 27.1 108.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"lateral production hole from 23,361'. 24h Summary Drill ahead 8 3/4"lateral production hole F/22,403'T/23,361'. Operation at 07.00 Drilling ahead at 23,652'MD Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 3 P PJSM,Drill F/22,403'T/22,718',TVD-3,582', 6.924.45 ADT-3.39,TQ-18/20K,HST-225K,ROT-140K, ECD-11.78/9.4MW,RPM-120/180,GPM-470, 3870psi,Max gas-987 units,0 mud losses 06:00 12:00 6.00 12.00 DRILL E 3 P PJSM,Drill F/22,718'T/22,906',TVD-3,577', 6,981.75 ADT-4.27,TQ-18/24K,HST-215K,ROT-140K, ECD-11.91/94MW,RPM-120/180,GPM-470, 3870psi,Max gas-898 units, 0 mud losses 12:00 18:00 6.00 18.00 DRILL E 3 P PJSM,Drill F/22,906'T/23141',TVD-3,575', 7,053.38 ADT-2.46,TQ-18/21K,HST-215K,ROT-140K, ECD-11.94/9.4MW,RPM-120/180,GPM-470, 3870psi,Max gas-1075 units, 0 mud losses 18:00 00:00 6.00 24.00 DRILL E 3 P 'PJSM,Drill F/23,141'T/233611 TVD-3,569', 7,120.43 ADT-4.35,TQ-18/21K,HST-229K,ROT-140K, ECD-11.82/9.4MW,RPM-120/180,GPM-470, 3860psi,Max gas-255 units, 0 mud losses Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDdlling@enipetroleum.com 907-685-0715 715-6434 Eni representative Mike Grubb ENI Drilling Supvr. 907-685-0715 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling cum 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5.045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 Well Name: SP28OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 9/612015 o Job: DRILLING Report#: 30 2 n Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) FOB MD @ Report Time(m...TVD @ Report Time(m.. 7,582.81 1,084.52 462.32 9.08 50.9 107.0 Daily Summary Operations 24h Forecast Drill ahead 8 3/4"production hole at 24,878'.Circulate bottoms up.Back ream out of hole as per K 8 M schedule. 24h Summary Drill 8 3/4"lateral production hole F/23,361'T/24,878'. Operation at 07.00 Circulating bottoms up before backreaming out of the hole.TO at 24,986' Lithology Shows Mud Weight(gIL) 1,1264 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 3 P PJSM,Drill F/23,361'T/23,839',TVD-3,565', 7,266.13 ADT-3.04,TQ-19/21K,HST-225K,ROT-140K, ECD-12.12/9.4ppg,3840 psi,RPM-t20, Max gas 1179 units,0 mud losses 06:00 12:00 6.00 12.00 DRILL E 3 P PJSM,Drill F/23,839'T/24275',TVD-3,565', 7,399.02 ADT-2.1,TQ-19/21K,HST-230K,ROT-140K, ECD-12.04/9.4ppg,3850 psi,RPM-120, Max gas 1166 units,0 mud losses 12:00 18:00 6.00 18.00 DRILL E 3 P PJSM,Drill F/23,275'T/24586',TVD-3,569', 7,493.81 ADT-1.86,TQ-21K,HST-230K,ROT-135K, ECD-12.14/9.4ppg,3970 psi,RPM-120. Max gas 1704 units,0 mud losses 1800 00.00 6.00 24.00 DRILL E 3 'P PJSM,Drill F/23,586'T/24878',TVD-3,559', 7,582.81 ADT-12.08,TQ-20K,HST-250K,ROT-132K, ECD-12.12/9.4ppg,4000 psi,RPM-120, Max gas 935 units,0 mud losses Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Em representative Mike Grubb ENI Drilling Supor. 907-685-0715 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 9 5/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5.054.19 1.102.09 FazePro 1,1264 47.8 1,560.2 171.9 Well Name: SP28-�OR 0 Daily Report Wellbore Name: S NW3 Well Code: 29881• Ret ort#:1315 Page:II Job: DRILLING Rep Date: 1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 32.92 107.0 Daily Summary Operations 24h Forecast Continue BROOH. 24h Summary Drill 8 3/4"lateral production hole F/24878 to TD at 24,986'.Back ream out of hole to 20,646'.Hole is breathing,mud loss to hole 56 BBLs. Operation at 07.00 Back reaming out of hole at 19,950'MD Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:30 1.50 1.50 DRILL E 3 P PJSM,Drill F/24,878 To TD at 24,986',TVD-3552' 7.615.73 ADT-.72,HST-245K,ROT-135K,TO-21/22, 450 gpm,3860 psi,ECD-12.16/9.4 ppg, Max gas747 units,0 mud losses. 01:30 02:30 1.00 2.50 DRILL E 6 P Obtain final survey,send multiple down links to tools to prepare for reaming.Monitor well,obtain SPR's. 7,615.73 02.30 07:30 5.00 7.50 DRILL E 6 P PJSM,Back ream out of hole F/24,986'T/24,775', 7.615.73 Circulating 1 BU per stand for first 2 stands. GPM-455,PSI-3850,ECD-12,RPM-130,TQ-16K, HST-220K,ROT-140K.15 bblsmud loss. 07:30 12:00 4.50 12.00 DRILL -E 6 P PJSM,Back ream out of hole F/24,775 T/23,840', 7,615.73 GPM-455, PSI-3850,ECD-11.84,HST-210K, ROT-139K,TQ-18/19K,12 BBLS mud loss. 12:00 18.00 6.00 18.00 DRILL E 6 P PJSM,Back ream out of hole F/23,840 T/21,793', 7.615.73 GPM-460, PSI-3766,ECD-11.59,ROT-139K, TQ-18K,12 BBLS mud loss.Bore breathing 18:00 00:00 6.00 24.00 DRILL E 6 P 'PJSM,Back ream out of hole F/21,793'T/20,646", 7,615.73 GPM-460, PSI-3751,ECD-10.39,HST-190K, ROT-128K,TO-16K,.Bore breathing 15 BBL mud loss. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Mike Grubb ENI Drilling Supvr. 907-685-0715 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 9 5/8 8.84 L-80 -1.47 5.045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1.560.2 171.9 Well Name: SP28- OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 91812015 2n ri Job: DRILLING PaPage: #: 32 1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 0.00 102.0 Daily Summary Operations 24h Forecast Cont.to BROOH as per K&M. 24h Summary BROOH f/20,686'-20,293'and C/O Saver sub and handling equipment to 4.5".Cont.to BROOH f/20,293'-18,400'.Note;Difficulty working through canning shale(19,051'-18,420')and monitoring for breathing. Operation at 07.00 BROOH @ 17,181' Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:00 1.00 1.00 DRILL E 4 P PJSA BROOH f/20,646'-20,293'@ 470 gpm,3600 psi,130 rpm,14-15k tq,11.33 ECD,195 puw,N/A sow, 7,615.73 137k rotw. 01:00 02:30 1.50 2.50 DRILL E 20 P PJSA C/O saver sub to 4.5"NC46 and handling equipment. 7,615.73 02:30 06:00 3.50 6.00 DRILL E 4 P PJSA BROOH f/20,293'-19,155'@ 470 gpm,3600 psi,130 rpm,12-13k tq,11.31 ECD,193k puw,N/A sow, 7,615.73 135k rotw. 06:00 12:00 6.00 12.00 DRILL E 4 P PJSA BROOH f/19,155'-18,870',@ 463 gpm,3500 psi,80-130 rpm,14-15k tq,11.33 ECD,N/A puw/sow, 7,615.73 135k rotw.Note;Working through canning shale f/19,051'-18,870'.34 bbls Toady fluid losses. 12:00 18:00 6.00 18.00 DRILL E 4 P PJSA BROOH f/18,870'-18,568'@ 430 gpm,3140 psi,120 rpm,16-21k tq,11.4 ECD,N/A pow/sow,130k 7,615.73 rotes.Note;Working through canning shale. 18:00 00:00 6.00 24.00 DRILL E 4 P PJSA BROOH 1/18,568'-18,400'@ 430 gpm,3000 psi,120 rpm,16k tq,11.25 ECD,N/A puw/sow,128k 7,61573 rotw.Note Working through canning shale and monitor well for breathing.138 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1.102.09 FazePro 1,126.4 47.8 1,560.2 ,171.9 0 Well Name: SP28- OR Daily Report Wellbore Name: S -NW3 • Well Code: 29881 Date: 9/9/2015 • Report#: 33 2n 0 Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m.. 7,615.73 1,082.64 0.00 101.0 Daily Summary Operations 24h Forecast Cont.to BROOH as per K&M f/10,137'to 1850'. 24h Summary BROOH as per K&M f/18,400'-10,137'. Operation at 07.00 BROOH @ 9,100'MD Lithology Shows Mud Weight(g/L) 1.126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan _ Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 4P PJSA BROOH f/18,400'-16,497'@ 502 gpm,3610 psi,120 rpm,11-12k tq,11.02 ECD,188k puw,95k sow, 7,615.73 139k rotw.Drop rabbit on stand#170. 06:00 12:00 6.00 12.00 DRILL E 4 P PJSA BROOH f/16,497'-14,599'@ 500 gpm,3250 psi,120 rpm,8k tq,10.95 ECD,154k puw,100k sow, 7,615.73 134k rotw.Monitor well-static.30 bbls Tourly fluid losses. 12:00 18:00 6.00 18.00 DRILL E 4 P PJSA BROOH f/14,599'-12,035'@ 500 gpm,2850 psi,120 rpm,Ilk tq,10.83 ECD,150k puw,100k sow, 7,615.73 120k rotw. • 18:00 ---00:00 6.00 24.00 DRILL E 4 P PJSA BROOH f/12,035'-10,137'@ 500 psi,2550 psi,120 rpm,10k tq,10.72 ECD,145k puw,102k sow, 7,615.73 120k rotw.7 bbls Tourly fluid losses. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Paul Holley ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(gIL) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 Well Name: SP28- OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881• Ret ort#: 34 9/10/2015 2no Job: DRILLING " Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 0.00 104.0 Daily Summary Operations 24h Forecast Complete POOH and UD BHA.Clear and clean rig floor.Clean stack and blow down Choke and mud lines.R/U and test BOPS as per AOGCC specs.Witness waived by Lou Grimaldi.Blow down and R/D f/ testing.R/U GBR casing equipment and hold Safety meeting.P/U&M/U 5.5"Liner as per tally and RIH. 24h Summary BROOH(/10,137'-1880'.Circ.hole clean and POOH to 1312'. Operation at 07.00 UD BHA,Prep for BPOE Test. Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 06:00 6.00 6.00 DRILL E 4 P PJSA BROOH f/10,137'-8236'@ 512 gpm,2320 psi,120 rpm,5-6k lq,10.55 ECD,140k puw,105k sow, 7,615.73 123k rotes. 06:00 12:00 6.00' 12.00'DRILL E 4 P PJSA BROOH f/8236'-5869'@ 550 gpm,2180 psi,120 rpm,4-5k tq,10.30 ECD,135k puw,110k sow,123k 7,615.73 rotw.11 bbls Tourly fluid losses. - 12:00 18:00 6.00 18.00'DRILL E 4 P PJSA BROOH f/5869'-3214'@ 500 gpm,1400 psi,120 rpm,4k tq,10.23 ECD,130k puw,110k sow, 123k 7,615.73 rotw. 18:00 21:00 3.00 21.00'DRILL E 4 'P PJSA BROOH t/3214'-1880'@ 500 gpm,1200 psi,120 rpm,4k tq,10.12 ECD,125k puw,105k sow,123k 7,615.73 rotes,. 21:00 22:30 1.50 22.50 DRILL E 7 'P PJSA Circulate hole clean @ 500 gpm,1200 psi,120 rpm,while reciprocating.Monitor well f/15 min-static. 7,615.73 Pump dry job and blow down. 22:30 00:00 1.50 24.00 DRILL E 4 P PJSA POOH on elevators f/1880'-1312',118k puw.5 bbls Toady fluid losses. 7,615.73 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. • 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Maas Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 9 5/8 8.84 L-80 -1.47 5,045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgt/cm') 9/1/2015 Formation Integrity 5.054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 10.0041. Well Name: SP28OR Daily Report Wellbore Name: S -NW3 III Well Code: 29881• Ret ort#: 35 9/11/2015 2nfi Job: DRILLINGp Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 0.00 109.0 Daily Summary Operations 24h Forecast Cont.to M/U and run Liner as per tally.M/U Baker Liner Hanger assy.and service.P/U MWD equipment as per SLB and orient.RIH w/Liner to setting depth and orient prior to setting. 24h Summary POOH and IID BHA.Clean stack and R/U and perform BOPE testing as per AOGCC specs w/5"8 4.5"test jts.Witnessed waived by Lou Grimaldi.R/D from testing and R/U to run 5.5"slotted liner w/swell packers.M/U 8 RIH w/5.5"Liner to 3971'. Operation at 07.00 M/U and RIH w/5.5"slotted Liner @ 6,360' Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 00:30 0.50 0.50 DRILL E 4 P PJSA POOH f/1312'-361'.Retrieved rabbit and monitor well. 7,615.73 00:30 03:30 3.00 3.50 DRILL E 4 P PJSA UD BHA as per SLB.Remove nuclear source. 7,615.73 03:30 04:30 1.00 4.50 DRILL E 20 P PJSA Clear and clean rig floor. 7,615.73 04:30 06:00 1.50 6.00 DRILL E 19 P PJSA R/U and wash stack with Vetco on site. 7,615.73 06:00 06:30 0.50 6.50 DRILL C 19 P PJSA Vetco pull wear bushing and set test plug. 7,615.73' 06:30 07:30 1.00 7.50 DRILL C 12 P PJSA R/U for BOPE testing and perform body test. 7,615.73 07:30 12:00 4.50 12.00 DRILL C 12 P PJSA Test BOPE as per AOGCC specs w/5"DP.5 bbls Tourly Fluid losses. 7,615.73 12:00 13:30 1.50 13.50 DRILL C 12 P PJSA Complete BOPE test w/4.5"DP.Tested all Gas Alarms.Witness waived by Lou Grimaldi. 7,615.73 13:30 14:00 0.50 14.00 DRILL C 20 P PJSA Blow down and R/D test equipment. 7,615.73 14:00 14:30 0.50 14.50 DRILL C 19 P PJSA Vetco pull test plug and install 9"wear bushing. 7,615.73 14:30 16:30 2.00 16.50 DRILL G 20 P PJSA R/U GBR casing equipment and tools. 7,615.73 16:30 18:00 1.50 18.00 DRILL G 4 P PJSM w/all personnel.M/U and RIH w!5.5"15.58 L80 Hyd521 slotted liner/swell packers/blanks to 413',85k 7,615.73 puw/sow. 18:00 00:00 6.00 24.00 DRILL G 4 P PJSA Cont.to M/U and RIH w/5.5"Liner f/413'-3971'(99 jts.),110k puw,105k sow. 7,615.73 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Pat Krupa Doyon Drilling Tour Pusher Last Casing Seat Can.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 95/8 8.84 L-80 -1.47 5,045.05 1,101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgflcm°) 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1.126.4 47.8 1,560.2 171.9 Well Name: SP28OR ! Daily Report Wellbore Name: S -NW3 DaWell Code: 29881• f Report#:�6015 2n1 Job: DRILLING II �� Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,61573 1,082.64 0.00 110.0 Daily Summary Operations 24h Forecast Cont.to rotate in hole to setting depth and orient Liner Hanger assy.Double check all parameters and drop Baker ball and pump down.Seat ball and set Hanger/Packer as per Baker.Release running tool and PT Packer w/1500 psi f/15 min.POOH,cut and slip drill line,cont.POOH and UD running tool and BHA. 24h Summary M/U and RIH w/5.5"Slotted Liner assy as per tally to 8213'.M/U Baker Liner hanger/Packer asst'.w/SLB Slim Pulse assy.Orient total assy.RIH w/Liner on 4.5"/5"to 20,218'.Start rotating in hole @ 19,192'w/ 40 rpm,140k rotw,12k tq. Operation at 07.00 RIH W/Slotted 5.5"Liner @ 22,010' Lithology Shows Mud Weight(g/L) 1,126.4 Time Log Start End Cum Dur End Depth Time Time •Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 07:00 7.00 7.00 DRILL G 4 P PJSA M/U&RIH w/5.5"15.58 L80 Hyd521 Slotted Liner w/Swell Packers as per tally f/3971'-8213',125k I 7,615.73 puw,95k sow. 07:00 08:00 1.00 8.00 DRILL G 20 P PJSA R/D GBR tools and equipment.Mobilize Slim Pulse handling tools. 7,615.73 08:00 12:00 4.00 12.00 DRILL G I 4 P PJSA P/U&M/U Baker Seal Bore Receptacle,Main Bore Liner running tool,Ball seat packoff assy,Slim 7,615.73 Pulse assy,MLZXP Liner Hanger/Packer,2-Magnets and XOs back to NC46 to 8281'.Orient system. 12:00 18:00 6.00 18.00 DRILL G 4 P PJSA RIH w/5.5"Liner on 4.5"DP f/8281'-14,937',165k puw,90k sow.Perform SHT @ 9716'@ 84 gpm, • 7,615.73 250 psi. 18:00 00:00 • 6.00 24.00 DRILL G 4 P PJSA RIH w/5.5"Liner on 4.5"/5"DP 9 14,937'-20,218'.Start rotating @ 19,192'@ 40 rpm,12k tq,140k 7,615.73 rotw. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI I Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator •907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Tool Push Grant Neubarth Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date CASING 9 518 8.84 L-80 -1.47 5.045.05 1.101.64 8/26/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(g/L) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,5602 171.9 Well Name: SP28 OR ` Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 9/13/2015 o Job: DRILLING Report#: 37 2 n Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.88 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 0.00 108.0 Daily Summary Operations 24h Forecast Complete CIO saver sub and pump out of hole to 4.5"DP.C/O saver sub to 4.5"and pump out of hole and inspect BHA.Clean magnets and UD Baker running tool and BHA.Send magnet pictures and info to town. 24h Summary Rotate 5.5"Liner in hole to 24,615'.Orient Liner hanger/packer to 32 degrees Left.Verified.Drop 1.625"ball and pump down.Seat ball and pressure up to set Liner hanger and pack off.Release f/hanger and test packer to 1500 psi f/15 charted min.TO Liner @ 16,362'.POOH w/4.5"DP to 16,266'and swabbing well.Pump out of hole to 16,101'and perform cut and slip ddg.line.Cont.to pump out of hole to 12,583'.C/O handling equipment to 5".POOH w/5"DP and well not taking proper fill.Changing out saver sub to 5". Operation at 07.00 Pump out of hole w/5"DP @ 10,716'. Lithology Shows Mud Weight(gIL) 1,126.4 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 09:00 9.00 9.00 DRILL G 4 P PJSA Rotate in hole w/5.5"Liner on 4.5"/5"DP f/20,218'-24,615',210k puw,138k rotw,120k rot sow.16- 7,615.73 18k tq. 09:00 10:00 1.00 10.00 DRILL G 19 P PJSA Orient Liner/Packer assy.to 32 degrees Left. 7,615.73 10:00 12:00 2.00 12.00 DRILL G 19 -P PJSA Baker drop 1.625"ball and pump down @ 105 gpm,700 psi. 7,615.73 12:00 13:00 1.00 13.00 DRILL G 19 P PJSA Cont.pumping down ball @ 105 gpm,700 psi and increase to 126 gpm,840 psi.Seat ball and pump @ 7,615.73 42 gpm to 4100 psi and hold for 5 min.Slack off to 105k and then to 75k to ensure hanger/packer was set. P/U to 185k and test back side to 1500 psi f/15 charted min.TO Liner @ 16,362'. 13:00 13:30 0.50 13.50 DRILL E 4 P PJSA Monitor well-static.POOH w/4.5"DP f/16,362'-16,266',185k puw.POOH was swabbing,so decision 7,615.73 was made to pump out of hole. 13:30 14:30 1.00 14.50 DRILL E 4 P PJSA Pump out of hole f/16,266'-16,101'@ 3.5 bpm,400 psi,185k puw,95k sow. 7,615.73 14:30 16:00 1.50 16.00 DRILL E 25 P PJSA Cut and slip 139'of drill line.Inspect and adjust brakes. 7,615.73 16:00 18:00 2.00 18.00 DRILL E 4 P PJSA Pump out of hole f/16,101'-14,966'@ 3.5 bpm,390 psi,180k puw,95k sow. 7,615.73 18:00 21:00 3.00 21.00'DRILL E 4 P PJSA Pump out of hole f/14,966'-12,583'@ 3.5 bpm,320 psi,168k puw,95k sow. 7,615.73 21:00 21:30 0.50 21.50 DRILL E 20 P PJSA Monitor well.CIO handling equipment to 5". 7,615.73 21:30 00:00 2.50 24.00 DRILL E 4 P PJSA POOH w/5"DP f/12,583'-11,740',165k puw,95k sow.Hole not taking proper fill.C/O saver sub. 7,615.73 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Malls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Grant Neubarth Doyon Drilling Tour Pusher Last Casing Seat Can.Type OD(In) ID(In) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date LINER 512 4.95 L-80 4,987.13 7,502.65 1,087.58 9/13/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgf/cm') 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1.126.4 47.8 1,560.2 171.9 ojois Well Name: SP28 OR • Daily Report Wellbore Name: S -NW3 Well Code: 29881 Date: 9/14/2015 • Report#: 38 2 n ii Job: DRILLING Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information End Depth(mKB) End Depth(TVD)(mKB) Depth Progress(m) Drilling Hours(hr) Avg ROP(m/hr) POB MD @ Report Time(m...TVD @ Report Time(m... 7,615.73 1,082.64 0.00 108.0 Daily Summary Operations 24h Forecast RIH w/Baker clean out assy.and sting into liner top and circulate and rotate cleaning metals to magnets.POOH and clean magnets. 24h Summary C/O saver sub to 5"and pump 5"DP out of hole to 9904'.C/O saver sub and handling equipment to 4.5"and pump out of hole to 7626.POOH and clean magnets.Recovered 7 Lbs of metal.LID Baker running tool and BHA.WU Baker clean out assy.and RIH to 4868'. Operation at 07.00 RIH w/Clean Out Assy @ 10,250' Lithology Shows Mud Weight(gIL) 1,1264 Time Log Start End Cum Dur End Depth Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. (mKB) 00:00 01:30 1.50 1.50 DRILL E 20P PJSA Complete C/O saver sub to 5". 7,615 73 01:30 05:00 3.50 5.00 DRILL E 4P PJSA Pump out of hole w/5"DP @ 130 gpm,260 psi f/11,7401-9904',150k puw,100k sow. 7,61573 05:00 06:30 1.50 6.50 DRILL E 20P PJSA C/O saver sub and handling equipment to 4.5". 7,615.73 06:30 10:30 4.00 10.50 DRILL E 4 P PJSA Pump out of hole w/4.5"DP @ 130 gpm,220 psi f/9904'-7625',141k puw,105k sow.Monitor well- 7,615.73 static. 10:30 12:00 1.50 12.00 DRILL E 4 P PJSA POOH f/7625'-6675',145k puw,105k sow. 7,615.73 12:00 12:30 0.50 12.50 DRILL E 7 P PJSA Pump 25 bbl dry job and blow down top-drive. 7,615.73 12:30 16:30 4.00 16.50 DRILL E 4P PJSA POOH w/4.5"DP f/6675'-37',80k puw/sow. 7,615.73 16:30 18:30 2.00 18.50 DRILL E 4P PJSA Clean and UD magnets.Recovered 7 lbs of metal.L/D Baker running tool and Slim Pulse MWD tools. 7,615.73 18:30 19:00 0.50 19.00 DRILL E 20 P PJSA Clear and clean rig floor. 7,615.73 19:00 19:30 0.50 19.50 DRILL E 20 P PJSA Bring clean out assy.to rig floor. 7,615.73 19:30 21:30 2.00 21.50 DRILL E 4P PJSA M/U and RIH w/Baker clean out assy.to 119',80k puw/sow. 7,615.73 21:30 22:00 0.50 22.00 DRILL E 25 P PJSA Service crown,blocks,top-drive,draw works and ST-80. 7,615.73 22:00 00:00 2.00 24.00 DRILL E 4 P PJSA RIH w/4.5"DP f/119'-4868',125k puw,115k sow. 7,615.73 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Greg Parker ENI Matls Coordinator 907-980-7545 Eni representative Wade Thomas ENI Clerk Eni representative Ken Bogner ENI Expediter 907-980-7545 Eni representative Dano Smith ENI HSE Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Grant Neubarth Doyon Drilling Tour Pusher Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date LINER 51/2 4.95 L-80 4,987.13 7,502.65 1,087.58 9/13/2015 Last Leakoff Test Test Date Test Type Depth(mKB) Depth(TVD)(mKB) Fluid Type Fluid Density(g/L) P Surf Applied(kg...E.M.W.(gIL) P LeakOff(kgflcm") 9/1/2015 Formation Integrity 5,054.19 1,102.09 FazePro 1,126.4 47.8 1,560.2 171.9 ci� Well Name: SP28 OR • Daily Report Wellbore Name: S -NW3 10 Well Code: 29881• Ret ort#/1112015 en fi Job: COMPLETION Page: ge:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB Overcast -2.8 SW @ 17 MPH 91.0 Daily Summary Operations 24h Forecast Cont RIH w/ESP Completion. 24h Summary M/U Gas Dispersion Tube and 7"Shroud assy.M/U lower ESP Baker completion and terminate lines.Perform MLE to ESP splice and test.Witnessed by ENI Electrician.RIH w/4.5"ESP Completion to 5447 as per tally and Baker Centrilift. Operation at 07.00 RIH w/4.5"ESP Completion @ 7,228' Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 00:00 06:00 6.00 6.00'DRILL K 4 P PJSA R/U Handling tools,M/U Gas Dispersion tube and 7"Shroud Assembly.P/U and service motor section.M/U seal assemblies and pumps to 140'.Install cap tube,tech wire and motor lead. 06:00 09:30 3.50 9.50'DRILL K 20P PJSA Secure Tech/Cap lines and Motor leads.Terminate lines to DGU.R/U GBR Volant tools and equipment. 09:30 12:30 3.00 12.50'DRILL K 20 P PJSA M/U Jt#1 Prep and Perform Gator Splice MLE to ESP and test.Witnessed by ENI Electrician. 12:30 18:00 ' 5.50 18.00 DRILL K 4 P PJSA RIH w/4.5"ESP Completion as per tally f/140'-2625',112k puw,108k sow,testing ESP every 1000'. 18:00 00:00 6.00 24.00'DRILL L 4 P PJSA RIH w/4.5"ESP Completion f/2625'-5447',120k puw,100k sow,testing ESP every 1000'. Daily Contacts Position Contact Name 1 Company Title Email Office Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.corn 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Malls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Dano Smith ENI HSE Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Eni representative Davide Simeone ENI Project Manager Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date LINER 51/2 4.95 L-80 4,987.13 7,50265 1,087.58 9/13/2015 oriiiiiiiht Well Name: SP28- OR M Daily Report Wellbore Name: S--NW3 Well Code: 29881• Ret ort#10:1 2/2015 ash] Job: COMPLETION Page:1 of 1 Well Header Permit/Concession N° Operator Affiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB Mostly Cloudy -6.7 SW @ 12 MPH 89.0 Daily Summary Operations 24h Forecast Complete hanger hook up and land Vetco Tubing hanger.Test hanger seals to 5000 psi f/10 min.N/D Stack,N/U Tubing adapter and tree.C/O BPV w/test plug and test tree and void to 5000 psi f/10 min.Pull test plug and Baker to perform final checks.Freeze protect well. 24h Summary RIH w/4.5"Completion f/5447'-14,087'.WU Vetco Tubing hanger w/BPV and Orient.Terminate Cap Tube and perform ESP splice to Penetrator as per Baker Centrilift. Operation at 07.00 N/D BOPE Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. - 00:00 04:00 - 4.00 4.00 COMP K4 P PJSA RIH w/4.5"ESP Completion f/5447'-7842',91k sow. 04:00 06:00 2.00 6.00•COMP K 20 P PJSA C/O ESP Spool. 06:00 07:00 1.00 7.00'COMP K4 P PJSA RIH w/4.5"Completion f/7842'-8173',91k sow. 07:00 09:00 2.00 9.00•COMP K 20 P PJSA Spool to Spool Gator Splice and Test. 09:00 12:00 • 3.00 12.00 COMP K 4 P •PJSA RIH w/4.5"Compl.f/8173'-9504',80k sow. 12:00 17:00 5.00 17.00•COMP K 4 P PJSA RIH w/4.5"Compl.f/9504'-12,396',71k sow,testing Cable every 1000'. 17:00 18:00 1.00 18.00 COMP K 25P PJSA Service Top-Drive,blocks and draw works. 18:00 22:00 4.00 22.00 COMP K4 P •PJSA RIH w/4.5"Completion f/12,396'-14,087'.68k sow. 22:00 22:30 0.50 22.50 COMP K4 P PJSA Install BPV in Tubing Hanger,WU Landing jt and M/U hanger to tubing and Orient as per Vetco. 22:30 00:00 1.50 24.00 COMP K 20 P •PJSA Prep and M/U penetrator,cap tube and perform ESP Splice as per Baker Centrilift. Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative •Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Dano Smith ENI HSE Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545 Tool Push Pete Adams ENI HSE 907-685-0721 Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date LINER 51/2 4.95 L-80 4,987.13 7,502.65 1,087.58 9/13/2015 ifir.0441- Well Name: SP28OR Daily Report Wellbore Name: S -NW3 Date: 1 Well Code: 29881 Report#13/2015 •en11 Job: COMPLETION Page:1 of 1 Well Header Permit/Concession N° OperatorAffiliate Initial Lahee Code ALASKA ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL Rotary Table Elevation(m) Ground Level(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m) 16.50 3.99 5.37 11.13 9.98 Rig Information Rig Name Contractor Rig Type Rig Num RIG 15 DOYON LAND RIG 0723 Daily Information Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB Clear -12.8 S @ 7 MPH 83.0 Daily Summary Operations 24h Forecast Rig Released @ 2400 hrs 10-15-15.Prep rig rig move. 24h Summary Terminate and test ESP on Vetco hanger.Land tubing hanger(Perforated Dispersion Tube @ 14,132'),RILDS and test seals to 800/5000 psi f/10 min.N/D BOPE,N/U tree and test to 5000 psi.Centrilifl perform final ESP checks.R/D ESP and Cap Tube lines to spooler and remove all completion equipment from floor.Lil Red freeze protect IA w/110 bbls of diesel.Secure well and release rig @ 2400 hrs. Operation at 07.00 R/D from well SP28,prep for move. Time Log Start End Cum Dur Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr. 00:00 01:00 1.00 1.00 COMP K 12 P PJSA Terminate Penetrator splice to hanger,Cap Tube and Baker Centrilift perform all tests on ESP. 01:00 02:30 1.50 2.50 COMP K 4 P PJSA Land Vetco Tubing Hanger,160k puw,70k sow.RILDS and test hanger seals to 800/5000 psi f/10 min. 02:30 06:00 3.50 6.00 COMP K 20 P PJSA R/D Volant CRT and equipment.L/D landing jt and clear and clean rig floor.Prep BOP for ram block removal. 06:00 08:30 2.50 8.50 COMP K 20 P PJSA Remove ram blocks from BOP stack. 08:30 10:30 2.00 10.50 COMP K 20 P PJSA N/D BOPE. 10:30 12:30 2.00 12.50 COMP K 20 P PJSA Prep Well Head and Tree for install. 12:30 14:30 2.00 14.50 COMP K 12 P PJSA N/U Tree,Baker Centrilift performed final cable checks,Test hanger void to 5000 psi f/10 min,pull BPV and install TWC. 14:30 16:00 1.50 16.00 COMP K 12 P PJSA R/U and test Tree to 250 psi f/5 min/5000 psi f/10 min.R/D test equipment. 16:00 18:00 2.00 18.00 COMP K 20 P PJSA Vetco remove TWC.Pull ESP and Cap Tube over sheaves to spooler.R/D sheaves and all other completion components from rig floor. 18:00 21:00 3.00 21.00 COMP K 9 P PJSA Lil Red R/U to IA and freeze protect w/110 bbls of diesel.Sim Ops;Pressure wash derrick,flush MP#1,#2 and choke manifold w/FW and Safe Surf O. 21:00 00:00 3.00 24.00 COMP K 20 P PJSA Blow dawn mud pumps and mud lines.Cleaning pits.Disassemble mud pump fluid ends.Secure well and release ng @ 2400 hrs. Daily Contacts Position Contact Name Company Title EmailOffice Mobile Eni representative Jack Keener ENI Senior Drilling Supv SIDDrilling@enipetroleum.com '907-685-0715 715-6434 Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058 Eni representative Vance Dale ENI Matls Coordinator Eni representative Wade Thomas ENI Clerk Eni representative Dano Smith ENI HSE Eni representative Ken Bogner ENI Expediter 907-980-7545 Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716 Last Casing Seat Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date LINER 51/2 4.95 L-80 4,987.13 7,502.65 1,087.58 9/13/2015 • • XYZ Oil company CASING&CEMENTING REPORT Lease&Wet No. ENI-SID SP28-NW3 Surface Date 12-Aug-15 County GPB State Alaska Supv. R John Chant CASING RECORD- TD 2808.00 Shoe Depth: 2788.00 PBTD: • Casing(Or Liner)Detail Setting Depths No.of Jts. Size Wt. Grade THD Make Length Bottom Top Shoe 13-3/8 BTC WTF 2.50 2,788.00 2,785.50 2 13-3/8 68 L-80 BTC Tenaris 79.81 2,785.50 2,705.69 Float Collar 13-3/8 BTC WTF 1.48 2,705.69 2,704.21 68 13-3/8 68 L-80 BTC Tenaris 2,664.31 2,704.21 _ 39.90 Pi anger 13-3/8 68 L-80 BTC Tenaris 3.59 39.90 36.31 Totals Csg Wt.On Hook: Type Float Collar: Float No.Hrs to Run: Csg Wt.On Slips: Type of Shoe: Guide Casing Crew: GBR Fluid Description: Liner hanger Info(Make/Model): Liner top Packer?: _Yes _No , Liner hanger test pressure: . Centralizer Placement: 1 centralizer 5'&8'above shoe,10'above FC,1 each joint up to 2273'MD,2 centralizer inside CP. . CEMENTING REPORT .v Preflush(Spacer) a. ro Type: Mud Push II Density(ppg) 10.1 Volume pumped(BBLs) 100 Lead Slurry Type: ASL Yield(Ft3/sack): 2.77 Density(ppg) 10.7 Volume(BBLs/sacks): 442/896 Mixing/Pumping Rate(bpm): 5.7 Tail Slurry Type: 12.5 LiteCRETE Yield(Ft3/sack): 1.56 Density(ppg) 12.5 Volume(BBLs/sacks): 66/238 Mixing/Pumping Rate(bpm): 4.7 1.u, Post Flush(Spacer) N Type: H2O Density(ppg) 8.4 Rate(bpm): 5 Volume: 10 it LL Displacement: Type: Spud Mud Density(ppg) 9.3 Rate(bpm): 6 Volume(actual/calculated): 394/39 FCP(psi): 400 Pump used for disp: Rig pumps Plug Bumped? x Yes No Bump press 900 Casing Rotated? Yes x No Reciprocated? _Yes x No %Returns during job 100 Cement returns to surface? x Yes _No Spacer returns? x Yes-No Vol to Surf: 221 /100 Cement In Place At: 14:00 Date: 8/12/2015 Estimated TOC: Surface Method Used To Determine TOC: Visual returns at surface Preflush(Spacer) Type: Density(ppg) Volume pumped(BBLs) Lead Slurry Type: Yield(Ft3/sack): Density(ppg) Volume (BBLs/sacks): Mixing/Pumping Rate(bpm): Tail Slurry w Type: Yield(Ft3/sack): a Density(ppg) Volume(BBLs/sacks): Mixing/Pumping Rate(bpm): N Post Flush(Spacer) 0 0 Type: Density(ppg) Rate(bpm): Volume: EDisplacement: N Type: Density(ppg) Rate(bpm): variable Volume(actual/calculated): FCP(psi): Pump used for disp: Plug Bumped? Yes No Bump press Casing Rotated? _Yes _No Reciprocated? Yes_No %Returns during job Cement returns to surface? _Yes_No Spacer returns?_Yes_No Vol to Surf: Cement In Place At: Date: Estimated TOC: Method Used To Determine TOC: Remarks: • i XYZ Oil company CASING&CEMENTING REPORT Lease&Well No. SP28-NW3 Date 28-Aug-15 County GPB State Alaska Supv. T.Simson CASING RECORD- TD 16562.00 Shoe Depth: 16551.83 PBTD: Casing(Or Liner)Detail Setting Depths No.of Jts. Size Wt Grade THD Make Length Bottom Top Shoe 9-5/8 Hydril 563 Davis-Lynch 501 2.70 16,551.83 _ 16,549.13 2 9-5/8 40 L-80 Hydril 563 Tenaris 77.78 16,549.13 16,471.35 Float Collar 9-5/8 Hydril 563, Davis-Lynch 700 2.80 16,471.35 _ 16,468.55 408 9-5/8 40 L-80 Hydril 563 Tenaris 16,438.55 16,468.55 30.00 Totals Csg Wt.On Hook: Type Float Collar: Float No.Hrs to Run: Csg Wt.On Slips: Type of Shoe: Guide Casing Crew: _ GBR Fluid Description: Liner hanger Info(Make/Model): Liner top Packer?: _Yes_No Liner hanger test pressure: Centralizer Placement: 1 centralizer 5'above shoe,10'above FC,1 each joint up to 6,133'MD CEMENTING REPORT Preflush(Spacer) Type: Mud Push II Density(ppg) 10 Volume pumped(BBLs) 100 Lead Slurry Type: 12.5 crete Yield(Ft3/sack): 1_56 Density(ppg) 12.5 Volume (BBLs/sacks): 190/684 Mixing/Pumping Rate(bpm): 6.3 Tail Slurry Type: G-Blend Yield(Ft3/sack): 1.16 Density(ppg) 15.8 Volume (BBL5/sacks): 51247 Mixing/Pumping Rate(bpm): 4.8 m Post Flush(Spacer) L',,- Type: H2O Density(ppg) 8.32 Rate(bpm): 6 Volume: 10 rt LL Displacement: Type: Mud Density(ppg) 9.25 Rate(bpm): 6 Volume(actual/calculated): 1237/1239 FCP(psi): 430 Pump used for disp: Rig pumps Plug Bumped? X Yes No Bump press 930 Casing Rotated? Yes X No Reciprocated? _Yes X No %Returns during job 100 Cement returns to surface? _Yes X No Spacer retums? _Yes X No Vol to Surf: 0 Cement In Place At 3:21 Date: 8/28/2015 Estimated TOC: 13,785 Method Used To Determine TOC: Calculated Preflush(Spacer) Type: Density(ppg) Volume pumped(BBLs) Lead Slurry Type: Yield(Ft3/sack): Density(ppg) Volume (BBLs/sacks): Mixing/Pumping Rate(bpm): Tail Slurry w Type: Yield(Ft3/sack): a Density(ppg) Volume (BBLs/sacks): Mixing/Pumping Rate(bpm): N Post Flush(Spacer) 0 o Type: Density(ppg) Rate(bpm): Volume: w Displacement: co Type: Density(ppg) Rate(bpm): variable Volume(actual/calculated): FCP(psi): Pump used for disp: Plug Bumped? _Yes No Bump press Casing Rotated? _Yes _No Reciprocated? _Yes _No %Returns during job Cement returns to surface? _Yes_No Spacer returns? _Yes _No Vol to Surf: Cement In Place At: Date: Estimated TOC: Method Used To Determine TOC: Remarks: N O O0)0)000) MVO., W 4 N r W O v N r e- m m 0 M 0 ,W v,v A N V 6 N V..0. 0 W 0 ...M.N., r W N N r M,4 W ,,MM, W,M W V W W V 6O MOV W 4 m v V W 4 m J 00000 ,,N V'O 6,0,0, N W W 6 V W 40 W W W 66'0 6 W M V O MwOMM N, W C6WrW rh N N V 6 6,W W VMVO., MV O m, 00.N. V O W N 6 V WNW 6 4 W d44rrr rrrrr rrrrr 4WWm4 6,,N NMMVV WWWAA 66660 ,N J 4'WrrrrrrAArAr46666wwwwwmmmmm6m66mm6 WNWWWN N6WWW NNWWN WWWW6 WWW6W ....no WW WWWWW NWWWW WW6WW WNN W NWNWW WN WWW WW 06666 00000 66000 0060 6666 66600 6666 60O6NNQ 6 6 6 6A 0 O d^r 4 W O oN m O M A O N A m W V V O (0,-0,N, 4 M O N W 6 r V W m m O m O ,M 9�.VVmmw OW6AN WWorr ,MMWN 46466 OW,WN WANWV t A OI,,,. * AAW NN e- ? 2232; 6 M W; V W 4 W'W- W M W m W .7S222."2 W N M N WV 624'22:= 2g2`,12 OVN W WvW W 4M m6rN O 6 N a aWmWW WWWWW n6m0 NVW40 ..,Vo. OM40 O.4N0Mm0WN mW C WWW6 mmmom666 WWWW4 ,,WWW ,—NM M'VW 6W 0000 OOoOO66OOO 00 .-- J o6666mmm 66666 666 m66momm6 66666 6666 66 N 440444444440440444 4444444444 644 4 Cl 4 oz-„,,,m1 N0466 ,v1MN 0Wt tt WWWtN 0WNW— 00066 0)MAM rN C w.N W N O A W M O W N W W M W W 4 V°-V W N O V W 6 W,N W 444Ar IVA N O WMr O Vo m 66GOO W 6AAV6WM NM N V'OWWW W WWMWM W;NWN t6NN6Wr al VVVV 4 4 VVVVMMM NN,,, 000000000000000 00 ..... WWWW. ..... N6WWW ..... WWWW. ..... W m 6 W W .. mW;r W 6 W NrNm VO W MW'-W .74;22 74;2 2 E;;; '4.4W2.'3 V N WOA6 'rv6r W 424' W N =.- Ne- NN MNN66 46666 66666 6TONM 64666 V . NmtNNNN NNNN NNNMM WW, *^WWO 66WWO 6V. O 00MN WWWW6 66666 66666 W6W64 rm 666 M ,06 MMMMM MMMMM66666 00MMM MMMMM MMMMM 6664 VVVV VVZ 6WWWN 6WWWWWWW6WN 000000WN 0000N00NN00W0oo00p000om .oWoWo too WOW.. otW WWW oo00 0oW totooW 0 0 W E Q O W N N 0 0 V V V CO0),V O, 4,W V, 0 0 W r W .VCON, M,N 6 4 N N W m W J Z06 V N M0MN W NN'-N ‘-M.M0 M W, M W W W 00 6004 W 0000 W M 0g264. 4 tO4 4 66666 . 6666 MMMNNV .-0' 0- 0 6.-6.-6 e-.-N4 o 46664 V M F. OOOWM ONMm6 WMNMM 06042 6WWm0 ONrWW rOWW ;2°66 00 00976 4MWA vrMW 664466 66644 MNWW, NMWN. WOWN 00 0.977 N N N N M f4 M M 4 0 V 66644 0)N Of)t6 r N W W N W N 0) 6 0 FNM 'n40M W ov6N6 Nr M W ve-r 0,0,.. NO ' . " N N N M M M O<'n N 999°? 4 ,0 0,— NM 0 W M az N OONAV ,VO NMrM, WWWNm 666 OO,MW WVrWm VNVV4 60 0 z.,0000,-0 N W W V m O W,M v W O 6 r V N 4 V r N,r .01.--NV W e-o m r Z _ _ N OCOO 0004� N V W.-.- NM6 W W ON V.. MNNNN ON VDt4+)M V m 6664 66666 6N05. 6 V,0 W Oo m r M V A. M W N 4446 WW N v LE W N VJ W ,� 0 >� tZ 22 6 z W 0 0 0 m NWr W N W V 0to 0 V tote-, NMO W W W W N W N VrN6 Wr Wr6 N o d a d B.-00 W V W ,V mM W W W W ...OW 6.-4-66 OA4A6 6A W r0 W 4e-N W V 3 2 O C .. w 000.-.- .NNNN 4N46.4 fp W e-W '0666 A�'6NN NMWMM 0004, 06 N U t 6 ° h '° N C ° 0 464 66,W W N N M M V V V..t.o O,,W W N Ow,,N m V w- E r m o o r o W'w Z O or= Eo. 6 6'4 o j)U' a6 • 6 c2 6 m o C 6 6 Q m H o V 2i Z ❑=0 W 060.6 V W O W N 4A W NN 'O MN NC ..-,1,,.. MV W W V W O W4m V4 CO X" OW0W NWM4 m. - VVVWN VNAVM NVtVV W,N,W 6VWWr WM N t L 060« .NNNN 46666 NNNC—O 660)46 4'666 V 64N4.6 V N V'6 N NN66 66 d V W W.-6 m M N 4 6 0 M 6 M m V r O r W VN Z .-64 M M V VV... W 4 O O,,N MV a E r d a 0 C w L O c e o 'o f y C a E W 2 "Wei aE.c`', m o W v w o L'E c n gW iov d s to ;jam O c o c d LL .& t . c Z m U^.o o N o v vow., N W W V o N O W, 6 W W 0 W r_ r_ v N m m W n m 6 V v 15- W W W V O > r Q y C❑ p yWy�9 N '000C-C 6NN W M V N00). W W W OO) 'V W M6 W V V rM Nc')N N P) Gp0�r O'O L Q ❑TI T, H A a N� EP I' t 0 > NNN '-NV "7- . NNMM V q',722(1 NN6MOW) OOFN M^ t w m aTi u u C C c o z.m v i m U .2 .Ac m O Z tcf00 ' � Am— mC,v_3n Z O N 0'x000 W° 21:12 22 7,4R22 L`( W N 0 N 0 .4 0 0 0 N0N 0 0 0) N W WN. ;8A22 OvM frO 0 OO6m<, 0) M6W 66660 . 640 N00V 44606 NNNN.- WN)6M 64 VC—vW 6.Nm VMNN 04rW 00W4 NOmWM 0AV4 h4N4 W = ' NNNM VWW4W 600, NV... A66W0 ,,NNN VpVWm 66 - r r — ,«' N NNNNN NNNNN NN Cl) M z N.'-60,6V OrvOO .MVMN001...Nr,4 W,W O V „ ..0 Wf")6W M ,O N”V,W O W N M N O 6 V N N MM,..r 6 V W W r N h W 6 W W W m 6 O V NW 1 ❑ MMMW4 N4OMN 4 0)0 6' m W 6 6 6 .-V 6 6 0 M 0 64666 m Op 6No 66 > 4660 6064 MODmrW WVMNO .,.MN rW6 NmW - m,rN WO N _ F 6 _ NNvWWrWO,N NW W r W W W N NNN N N NNN N N N I VLL Cl) V V! W N W M❑O) 6 O N N `ryry�002740 6 W V W O 43'f2'6.-O5 M6I NO 6MN O r ^N`0 6 'r,'2' 0 0(p 0Wm oNN 2°.2 W 2 VCNfD F N_ONWO6NW WMvv OWWWN WNrWm r64 46 NWW0 ONM N Q ONqy NN NO. 0NNNN NNNNN NNNNN NNN NNNN NMNN NM NON MMMMM MNNNN NNNNN NNNNN NNN NNNNN NNNNN OI r 0-4 ' d W — 6 6 4s N❑ N W N V N O C -00,0, 0000)V V'1( NN M N N W,..0 O MH M '00n V nN O V W 66 0,00'606 6!00000 W ON) IT o N E W M 0 0��� 00000 �M 6 6 C— N 'N N N N N N N 0 M v 0 0 0 N W O M,,,..0 v 4 fp O-_`°4 r 0 r , ,,WWW NNN N M M M M V V V V V ..... 6 6 ▪ eE'(' ME. WZZNZE1rr" W 0 N d 6N aW66AW d u0.N8,avOoom WWZW0WWWvZZZOON ❑'x06 W'Otp - 2'4222 't0)V NNO 22'422 NNMP4)0- 2O2N° V*7tVo N4)004DNt0o g? 2-6666— —..v.6'e-666 666 666166 MtotriM6 4646 .-464 6oc46'- . . 6 m —0 OVMNN OOmm W W W ,00.. 64 W W'n NmN,, Orn C •-N N M M V h co,co mo.-.-N W, W W 0 0 0 N M N N W r A N m O 0 j� Q .-'-.-.- ,,,INN N NNNN NNNN M MM Cl c o r d of W E c W rm c N C qQ oQ ildL @t'F 13 •CC1 d (-5 . 0LL, -2—,36-00g Uas = Z❑= . . .m- - r wv°«Uao amd_ Z vp KUm > C JWCc> EE w U V 0 LO 0 O^d W W W^ N.000 ^T N M T Q M d O0 T d M M W00,..4.0, 00000 0 0 0 0 00000C, ,CM.-COW ^O r^W d M W^O MM UI °te d O MOWW '-T.-r M O W d W "-WOO. N d 0 W W 00,00 W W d W d e T T NO.-MM M W W T r W T N O W WO 0 W WTO N N N M M W , W d N W 0.00. rWT^d N r'-WO O W M O W T O W N W M T ,,,WW T TMT d N M W W W WW W d N O AMT M r^W T M r"-W T N W O d W N W O d T M N W W .0000 W O d W M W O M r 0 d WNW O d W M r N r N r N A 9 .0. d N W W r r W W W W T O O^ N M M M d d Y W N W W r r W W 0000.- N N N M M`'^N W W W W r r r W W W NN T T T W T T W 0 T O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O o 0 0 . N N N NN W W W W W 0 N W ..... W W 10 W W W W W W W W W W W W W W W W 00000 W W W W W 0 n O W W W W W W W W W W W W W W W W W W W W W W WW 000 WWWWW W W W W W W N W N 0.0.. WWW W W O0 W N W .00.. W N 0.000 00.0. 0 0 W 0 W .0... 0 W 666 OOOOO 66666 OOOOO 666.66 66666 OOOOO O O O O O 0 0 0 0 0 00000 00000 0 0 0 0 0 66666 00 Q rrn rrrrr, rrrrr, rrrrn rrArA An nrrrr, Arrrr, rrrrr, rrrr, rr,r, rrrrr, rr 0 o^ r^O i N 0 N d N M M W W 0 N0,00 T Y)W W W e N N W W M T W W N W^ d M W r d d A W W O N N O O 0 W 9 <0 C)r O W O WWW W ^W N O M N^ MO.-NW O O)O r W W O N W T W O T N N M W W T W W O N W T ^r W T M N n W 0N W M d 0 r W M r d T W^W N W d 0 A .4.0"1.00 N r M r N W O Q r^ N.-00N h T^W^ W W d N Or d O A N M A W M N W d M d 00 N W T d T .00N, M W d O 0 W N W M T e O W 1- W N r N W M W N r M W M T d 0 0e-,001 d O W^ NW r M W d e T e T d o 0 0 NOW OA W N O W W MO W W M^W 00.-COW M^T W d T W d•- TN ddNTd T W d Tr rNOr W N Or W NO A W NOr W M O T O O^N M M d W W 0,000 O.-N N M d W W W r W W T O ^ M d d W W r r W 0100'-C4 d d W W n AWT O 0^N M M d O 0J 0N N N N N NNN N M CN 0M M M M M MMM M M M M d d d d d d d 0 W 00 W W W W W W W W W W COO MTW 0WTT TOMMO MMW 0,000 000MM TTWTO 010000 M0000 WTTTT WWWT mTTTT 00000 TT N 666 66666 66666 66666 vvvvv aveve avaavveevv avaav avaav avaaveevvv avaav vv co a OI^d r M T N h^W W.-WWW W N d W O n m^^O M r W M^ M W T d d T A r ^T T r A N O W r M W W O M A N' M C W N M W W T W n W d M^W 0� OO d N T 00.07 O)T r W r O W N 0.0700 O 7 M W M O On^r d ^W W M N ��Q W W O N W N V N NNd6666.- Tlh W MO W w4oio Y)M�A A W dN0 0W N d ^TrNcD W W th^ 6 W dNO0 W dNW0 r W 4oi �- A'�T O N M d W W r W W W O^ N M d h W W A W T 00.-NN M d W W r T O N N M Q W w W A W T 0)O^N M d W W r A WTO.- NN `000 W r W W d N O 000,00 d M N^O 000,0 W Q M N.- O T W W A W W d M N .-000, W W W d M N O T W r W O0 h d MN 000 W W W W W 00000 W W W W W WWWWW A r r r r r r r r r W W W W W W W W W W W W W W W WWW W W W W d d d d d d d d d .00 ..... ..... 00000 NNN. ..... 00000 .... 00000 .... ..0 0 0 00000 0 0.0 ..... 00000 .... 00000 .... ..... .. 01;;;00.4. W0Wdd N N M W T M WNW d 0 M M W O T M r d W O W O W N W W W O TNN A W T r WO W W W07rT NNWWW AWO)M OMWWW mNMdM ANN O0 L RTNQ M ^TC 6 o66 0 WhoW N-QOW QQM^W WNr W C_^WW OWrT ONMHW 00^NM NW0O ^ NdNrW O^MWW WONd0 rToNM mWrT0 TONMW OA NNN MMMMM ddWWN WWWHW WWWWW rWWWW WWTTW TTTO 00000 Z Wd dW dW d d d d d d d d d d d Q d Q Q d d d d d d d d e Q Q Q Q d d d Q d Q d d d d d d O n O O n NN dddW NOWWWW. HNh0O0.WWNN0 00WWW WWWWW NNWW 0W00W 00000 nWW NWW WNW0W 000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00 WWW 00000 W0WWO WWWWW C00000 000100 WWWWW WWWW0 000000000000000010000000 00000 000 J r W r W M T W O WW rT d W d 0 0000. O TTN W M M N NW T W 0^ dW00 ,,MW, O NONW 00.-M, NNW.-.- M W OOWdN MMNMN wm 0O6GG 00000 66 066 OOOOO 00000 6666 O N N O 267,2g WOT Wci MNW dNWN W WNM^TN W W O WTd^TNM WMdM W TMrOM 5217"77-n ^gOdru)Wu)Wv) W dW MWnMud)TW T 0WM WIoAn OWIo=TSOWIO oWIoMM WO hd TW WO TW W mMD NvVNA NQWW NdWW NQWWo 0.-WWW OnWAT NMW10 0oTWrW WdMN N OTT WrWW0 OTWrW ulodMN WAWWd dMN^O 000,10 0A000 .-.-NCOM. W0 WT WTORN Md0001 NMdW� AWTO CCI" NC MMu)n u) Or WW1Q 1qr Ar C) (01:7,0N,- 0 Y1 N 0 T 0 0 N 0 0 r A W W O r^W N ^d M^N r T W^ .-00030 d N W -T T^T 000 N r r M N N W W ZM10,0 ^r 0 r^ O W M N Y) N n N W W W^0 07010'r. N r M W A n M W n W T N 7 O.- W00.0 W W N 0^ N O O W C) O T M Q N A d Z 66. W O N•-r W W^ W O N 01 N W o W o d O O0 0 W.- o O W N 666r.:4 O)W N A O M W T N W^W O W W N W W O N 66 _l O M W N d W r T O N M W W W TON M W W W T N Q W r W N M 10 r T O N d W r T^N d W W r T O N M N 0 COM.-NM. ..WWW W O N M W W CN0 000 1orAAn A W W W W .0... TT TTT 00000 O•-�-'-^ ^NNN NNNMM MM V."1.0.0MMMddddd W W W W W W 0 CO W O d d W W N S T O N A r W W N.-N00 M O W^O 0 T W O T 0 o O N r N O NM CO r d W W N 0 M d T N MOO O NMCO WNMW^ OOdd 0OdMe MOT OWWWW QNOWA mNNWO pCim:6 0WO'-tTNWWN 64r-:64omOn wWddM N.-.-OT WrWW 0ddMN O^OTT rrW MNN OOTW WAWW.OT rWTO.- NMdhW NNNTO WrWTT YWrWT ^NNM aaWprW 00"-NM dWWWr 0OO^N Md U NNNNN NM MMMMM MMMMM d ddd d eddd NWNWW 0000W WWWWW WWWWW A Gd ZN Z o W W d M d NNM d W d d M.- O W W M W W W d M W r T T W W N d W A T W T^M N W W T d 0 N N W O DOOM"-, W W CO MM., OO 0 A r 0 'I.,0 d r O M W W M W W Q C ^d r d W d r O M W W N 00M.0 N W T N,0 W N W O d W T N d W M W T NNr NMnOM Y'roviN 66666 C666 Nro W ori W noiW ovi 66m0WWW 10QdMN ^OOT OWrWW WWrWW 0cioiWW nQe0N Or WWW AO" NNNNMCNCCW ONWTO NMdd aWrWT YWAWW 00.-NM d0rW MO.-NN NN NNM MMMMM MMQ dddd .WNW. WWNWh WWWW W0WWW rr p_ rr r .0 C W N O. U O T T N W N N W r A W N W T N O T N r r W 0 'W A W W T M W W N W.-0000 N W Cr w.-0200 WWAWe 0NdrN WMTd0 WNd TWWTM ONWNT NQM WA W W00 000 aNNNW WW0i000NMMMC1 dddNN WO)GC = WN0WW TWrWW dMN.,O TWnWW MN.-0 00rrC0 00 000 NQMN.- OTWAW WOMMN W W W r W T 0^ N M d W W 0,0300 N M Q W O CDM W T O r N M d d W W r W O N M d Q W W n O^N M M d W W ,W00.- NM ^ ^^ N N N N N N N N N M M MMM M D M M e Q Q Q Q d d d d d d W O0 W O0 00.010 O N W W W W W W W W WWW,, rr r 00--, ztrYNOO NOmO , N00.-00 MMONN7d0N00N n ;sa rdNO 7TNA MO nW WW OCN N 0W NC07ON 000 1- NOT Wo!-Mei 000W 46646 NNO)NW TMWTN TNWTM W'-N eWrnW 00 000^^ NNNM WWWM.M. d W H W W W W r r r W W W T T T 0 0 0�- N N N N MMM d d W N W W CO,, WWWWW NNN NN NNN N NNN N WWWWW NNN N NN N00000 NN NN N N NN N MM NNNNN NNNNN NNNNN N N NNNNN N NNNNNNNN Mr W W W )COD ONO V M1M�)VNO CNCOOCCn N W rrm WWW NpQn�M r�mMO .-))W WNW) 0.00.-11.) W dM W 000 00 (0.-.-0310 W W MIr.:6666 0N W NMW WWWr 00.-NN WWW .d WW,,, ,WWWM 00000 NWWd. NWWW WWW,, ,,WWW TNW T 00TTO O NNNNNNN NNNN NN NNNNNNNNNNNNNNNNAM NNNNN NNNNN NNNNN NNNNN NNN NNN NNN N N N .- d0y.^....W,0 O NT OOM d d N 0 v W 0 W N 00"-W, 0 N M N O T`m p N00 N 00ONA `n m6N WNNWN COt0d OM .-01001...N ^N01 N n N 6 M IA<CiOCi nTDOOnnnn .06666 00000 NN'-00 .CMn 666 0060NnNNWWWW. n NNrrr WWWrC WWWWW nNNNNNNrrr N.WWW wCWWO EN NNNNN NNNNN NNNNNNNNNN NNN NNNNN NNNNN NNNNN NNNN NNNN NNNNN N Y^N•-O W N TdOd10 )ANT W d W TONNO W M W 0.W^TN O W W W h ,0.000 OTT TW h W W d m W 0 W W NW �W n0 nNh^W d!-ddh NTTT MOD W od W N^NT C00"-WO O W MN W 00030.- W W T^d W^ COrN W T dO W W NCD n t^r W 00000A00000000 AAr000000 0Ow 0D O0000 0D WW000 00000 00000 00000000 0 C0000 00 G«W OM W OWNOmWrM< CONO0� `nRANOO , OW0OW0NOMn� 00nV n0 N ,w WMA NVCO0NNDNO MWOaO ,OM WC0N00 M N W N W W N W T N N T N W T N W T.N T W T N W T N W T N W T M W T M W O M 641-:64 n MMN^ OTTWA rOWWd OTTWr MMNN^ OOTWW WWWe dMNNw O O T Wf`WO ruaNW OMm a. .. ... ..$ N ...ow on �� � WWWWW )mMMavaav Q«<a W . 0 WW 0rr nn,MWWWW TT 0) CO N N U_ yC E � 0 III . 0 Ora 6 00 O W W W N W O W M, O W A W W A,-,M 6 ,-N 4 A .OAA a m O N N N 001.,-00 4 M O W,- MON.,- O s M N M O A T 4 VW W ......,-0O3- W .-,-W ...NW .W T.,- ...W m O NTA. W W W N N O O s W 6 6 M N, ....c-CO NOW.,- O A 6 N a O M..W a O 00v- -COMM., .N W N m a W M O 6 .1-,-N. 6,-MW6 N A N W,- 1,..,-.0, 01,1-00) M.4 a (0,-00.V CO,,.. W.a,m N a W 4 6 � 0 4. N.M., ,-..N. MN... A N W O a COM,,-. O 4 6 M m N,,-.0) .6 M W N,N ,N,N, .6 M W .NOT O NV q J M M M a a.. W..,, ,m m 6 T .00,-,- N N M M a a a.. WW,,,W W W 6 T T 00,-,-N N M M 4 4 ..... ,WWW,- NM d N N N N N N N N N N N N N N N N N N N MMM M M MMM M MM... MMMMM MM... a a s 4 4 a a a a a a a a a a v a s a. .. W W W ..... W W W W W WOW.. W W W W W ..... WWWWW ..... WWWWW WOW.. O MMM M M.W. ..... W W 0.0 ..... ..... ..... N. ..... ..... ..... ..... ..... MNNW ..... .. 2 Odd NN000 0NNNN dONo0 00000 oNo on NNOn0 NNNNN 00000 000nn oo Coo 00000 00000 on Q V 0 01-.N.. ,0 M,M ..... A M.4 4 M N.,0 m 6 W,0 W W M W A WON.. MT.ON N.,-,.. O O N W M 4 W W O 6 CO0 M O 0 o- 9* W. N W,s 4 NOV.. O N to 0 00 .N M W W a W 6 N, MOW., OOWM, 0,-,.. W W 4 W a 00,-M. ,•-.-O N M N « -,M O W N.. o W 4 N 0 , M 6.0. 0.00. ,m N v O.,-,0000, 6 4 W W W MOW,. O,v M a WTO. V.,-0, .1-, M.4 6. W N W a M.,-,C,1 ....0 W.-A N A M W M T a O.M.0 .0 4 m N W O a W N W OMA,- .6 M W,- VOW., .,- 0 .0 OW. O W.M ,-W.M W a,-6 WV,-M, a NTA 4 N 6,a N N O ,.N 6 A 4 N 6 W a 6 W M.- ...0. N 6 W M 0, C W W, W 6 T O.- N N M s. 00,.. T O,-,-N MVV.. „W 6 O O,-N M 4 4.W W, .0).0,- O N M 4. ..A.W 000,-N M M O O WWW WWW,, AAAAA ,AAAA ,WWWW WWWWW WWWWT 66666 TTTTT 66600 0000 00000 OP 00OO , 666 TTTTT TTTTT TTTTT TTTTT TTTTT TTTTT TTTTT TTTTT 60.00 0OOO 0OOOO 000 N N6vOaOOOOv660o OooOo NOoOO GCGCC GC 466 6666 6666a 6666 a6666 66aa6 6a6v6 6666 666a6 664.. ..... ..W WWWWW .. . . . . . . . . . . . . . 8 . 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' . 4 1 1 1 1 1 1 1 1 1 1 . . . . . II rn T^6 00.- a6A6 oa6M0 vN.6s OWT-NN oNmMm O aM.v sa,NM 000,01. 6.4 ,',0.1,1.,0 V ov. 0 0 01 Y4 0 6.-6 O O CWo M.-Tm. 46.0 ..CO,. VN,-00 OTU- N N.00 MVV,,- WNN00000 MAWA 0 ,,.AM W .ytC0N OWNM0A4N0 ,.MOW W0W WMCOOO W40106 AWM.-O C0AO .WWW MWWWW WWW WW... ` s. .W,m6 TO•-NM M4.WW A00o NMMa COW,mW TO,-NM M4O.N 6o0 N a.W, .60,-N CO4O,6 ON OT m,W.a MMN1-O TW,W. 4MNN,- OTWAW .4.N,- 00Tm, ..4MN O.. AW.4M «06 W,W.a aM WVaM MMM. MMMMM NNNNN NNNNN N,-,-,- OOO OOOOO OOOT6 66766 MTTT. WWWWW W. WWW WWWWWW WWWW M .. WWWWW .0.M .O0W .000aaaaaaaaaaaaaas.. WW .. . .. [ n .. n ...VV aa 0=0,. 'N,-,-M M 6 6 O, ,-N.M. W a,4 .W 6 4 O N.N O. ,-,000 N M 6.4 M M 4.,-N N W M N W O A,6 W M C N O A N m a s A N N O W O 6 M M N a N 0 6 W O O M O WNW.O W CO a N M 0O N N V M W 6 N M 0 6 4 4 4 NON N W.V.. Y N ,.-.04 6.-4,:c5 .W N W ,-6,-6.- IhMm 40 .Nm a.- ,M6.0 a OI M,N I-ZM�.. vi i Nor ISN,W N.Oi6 RI M O N 00.6 O NMa. ,WW,-C4 4.,m 0 4 W W 6 1-01 4. ,TON a .00.6,- NV.,.. M.A. 0,-.V. W,-V,,- W O O N M M M MMM M a aaa a a a v.. ..... OW... W,,,, ,,m W m W W W W T MOM.. OOOOO N N M M MV M.. ..... ..... M.... M M.N. ... ..... M.... O MMM. ..... W W W W W WOW.. M M..W M. z 000 00000 00000 00000 00000 00000 00000 00000 000 00000 00000 00 W.. ...COW °000 00000 W W W. ..... ...WW COW... ..... W W W W W W W W W W ...WO ..... ..... .W W W. W W y r M M M .W W W O.W O a ,m,-m, 6.M•-W .04.0. 6 6.,4 ,,-0,-V N M..-N ,W N a W W W 6 4 M.O N M )O 6 W 4 N 01 6 _J 0 a A-M M 4 WV,-,o-oo N.a m s s N W. d M M 4 M m O N 4 d O m.N MOW,. NON 4. M W N W a V,-.0, W.V.. 6 O O O 0 O 6,-,666 O 0 0 0 O O O O O O O.-O O 66666 O C O C O,-< N N NCO C «G G, 00000 .-6666 N NMM N M N M a m W,M .O.A 03.-V.0 M W M, 00.V. N.. NOM.. M N.,-. M,-.-a. 0,--•-NN a W O a e- 4 6 M.-0 M M O a O N, ..030,- V W,W,- O N,•-a .-a W O NMa.. ....V VN,.. O T m W.- ...N. A M M O° W W 4 N M ....V N N M.-a , N., 6.-666 CN 41 6 . V W RI O 0,Oi .AT 66666 .WWO O M.,6 O NN NN NM M N N NNN NNMM M V o,M A 6 6 sMN .-O6W W,W.a aMN,-,- )W,, W.4MM N,-OT6 ,..a aMN 0 TWA.. aMN 0 6m,W. M -000 WV M4. W,m.6 OWNMa WWWWWM0WMTWTT000p0p0 .010,-N V ..... ,-mN NNNNNNMA, , „ mmmmW 00WW 00 00 0 ,- N NN NN M CO m CV.6 N V,N. WM... M m 4.m W 6 4 4 4 ,-W T NNNW., ,W,N,- W W,6 N A NAA N ..... MM... N O Z ,A. O m 6 OWN.. OW.1-M M m m�. .n 0 W W a a T a.N 00000 v-01.01- vi016 0�1- WM... M W N 4 W ,.,-NV N 6 s O 6 W N.N O O O Z MWM 0001,.-,6 On666 66.-tdOi 46466 ,-,Nm4 O WtIOiW Oi4W 66666 40W.M N.-Om. RIOWs C4466 RI 006.- Na.,. W,-NM. W,m0' OaW,6 N4.A 6ONM. nWONM ..,60 014.,6 ... O,-Ma. a ,-a,,- WO W WWA ,,,,, mmWm O66 6667 O O N N NN N NN NNN NMM... NNN NN NNN N ..... NNN NN NNN NN N N NNNN NNN 0- W CO at40n ON)O',NM .00'IMV ,j,-,..p,4 m04i.mm Oa)N.nO ,'!-. 22°,2�l1M tr�nONm <'..—, 9 r..,-1 MO.N1� M00iNMn °�M co b M o m 66666 m—v,O Mm 6 N. m.-.M.- a W,-41A yr om A C 01.6 .-mow, 01,-01V0 RI Oi�.+i4 W oim.-N a.�.. M W N O ON,- ,-OTT. ,,... a M N N I- 00... ,(0,...0 p W W.4 a M N N,- O O T., ,W.V. N N,-O T W„W. 4 M N N.- W s W, .0500,- ,..0,- m M M Oai m 6 0 ,-COMV. W A A.6 O,-N M 4 ..,m W .0,-NM N NNN N 0010,-N N 0,-N 01 4 O. O ,,, ,A A W W .m m W m m m 6 6 m om 6 0 0 0 0 0 0 0 0 0 0 0 N N N N M M M M. CO Z Z CIO s W 6 W,,00 ...COW .N W N s .N M. V,-,.4 .,-..M ...,6 v.,-W ,-..NO O a W MV,-.V M T.,-. 00•-.. a CO _ft M,O a,O M, W.,-.. ,-..MN .A 6 M W 6 ,O M. CONN., 6 N.W 4 a 6.,-a W M T. W.N A .V.1-01 W A N Q M W O vicrideiai 601(0601 W T�.6 N.TN. TNW 601 660166 ..W.-a ..00101 .W W ON , 666,6 GN V,6 NO a W W W V a M N 6 6 W. .4 M M N ,-1-01.0) W,,.. .a M M N ,-00.. ,...V M N,-O o MOD,.. .4 M N.- O ,COW .n N MVO.. M W 6 0N.V.. ,...0 ,-N.V. 0,00010 1-'M M 4 N.,.T N.-N M a N NWA W .0,-N. M M W W W W W W W m m m 6 6 MM... 6 6 6 6 0 00000 0000,- N N N N N N N N MMM M .0 C m N T 0- W W 0.... a.O M, O W a. A 4.M. ,-MV,,0 0 m.... N O W a. ,6.W W ...MOO 00 6 M,- V,-.0. O.-,-M. 0 0. .00 Q W ,a W W W 0,-,- CO W�6, a 6.4 a 6 4 W N ,M.1,-. N,,-a N ..M m W,O M 6 s 6 a. .,-,.0 V i0.0 A a, O N N NMM M N N N,- 0000 0,-,-,-N N NM Ma 4.... ,,WWW ,W 401.- 0..., WW. V.,-00 O.-M.m .0 6., W N a M N, ,-00., W.4 M N ,-00., W.a M N ,-00,W, ..a M N .-00,00, .a M N,- O.m,W v M N,- 0 6 W,W W. w OV. 0,..0 ,-N N M a ..,COM 0,-,-N. a..A. .00,-N MVO., .6 6 0,- N.V.. A,W 6 0 N M a. W.,.T M O ,A, ,,,,. W W W W W W W W W W 6 6 6 7 6 MM... 60000 00000 0 0 0,- ,-,-,-,-N N NNN N N NNN N .� Y_ Z °E;42 mWW 46 T 4 4 W 42;22 01;NT ONd-O, 24.-28 Aa T 4 M,0 W 4,Z. 2243" m,4N m m M W M 22;22 O;NWr7 00;',--,6 M O M W m 6 s GM 664WN ,. .W.- s,CMW G ...4 .mM00 WM W . WaNh .M .W 4 -.,, NW „ A,..6 .000 NNN N.MMv Vv400 OwWW� AA060 ,-NVW O . . mONs. ,01,-NV mWTO M MNNNNNNMMMMMMMMM MMMMMMMMMMMMMMMMM .N MMMMMMM . M. MMN N MMM MMM.. . .. n .. ... .N O W MNW.O 22282 W.WM 4W.a 28222 O.T, OO00,4 22;'g2 TVOWW 22222 m,.W6 A.26= .WN2'2;4 ..;M ;WON 22 v,Ol NN W 04 6 4 m ., W ,,WWW O W a,o-4 W 01.0,W 6.0),-6 a. W MORIA 66,66 O,.M O,N44 MN N.M. VV... 000 ,, WOMMO 00 NNMMa 6,-01 4... M.Wm0 NV.,. Na.. AW ~ NNNNNNNNNNNNN NNNNMMM000MMMMMM ,-,-,-,-N hM. MMMMMMMMMMNNN NN NNNNNMM MM MMMM n. MM M 4 00,-6 N.4 N W n N,M ...V. W,-N.N ... 4 W.N O VV,-N. m,N N W ,,-,6 .-1,-04.. .N,00,- ON .CONM. MN W 01.6') Na O 46.. ..R).. ...OM. a.,0 m N.-,M. Om,- 6 W.6. 01,-.0.•- ...4.- 6, F 6066666 nO O6RRl,lh RCI A,6 W 6 66666 666666666 nnOOO60000 66666 66.006O-ON momWW666,66 N h C 6. 6- ,,, ,,,, ,, A,AA, A,AA, ,,, m,mm NNN„A, AWmWW ,,,mW comNNNMNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNN NNNN NNNNN NNNNN NNNNN NN N y Q Z r W N. V O W a 4 W N,N, M .. 4 6 00.. A V O W N W N T. 6 N.W W 4 N N s W .O ,WWW. a N O,-N C NNN N M.N M T A W M N N,-O,M V...-. V.0.7 WNW,. m o m m m mo m o o mm W M O N W A..O MOW.. ., mmm Wmmmm Wmaromm mmmmm mmmmm WWWawoW wwwwm mmWmao mnnnn nnrrin ,i°rtO,,, °A°nnn, nWmmm 44 woo 0=` , M Om N 6.-. .O.-.-T ,,,MN ,,M N .-M M,N W OMA N N 6 6 W O M.O.. N W M,. . N A N M00,-. .O,-. M a N W N .,mM .- O4,N. .,-400 601,.- . WO M,W74 AOaWN ...NOW Na,Oa MOa .7.007 06M00 MW .-4, .-46.-6 6.-46‘- VR .-<RI .-46.-6 m-NRN ,mCR66 -6 R.-...- 66-60 -MN016 0NRWN .W01.6 . W.s 4MNN,- 006mm ...v QMNN,- 006.W ..4 4MNN,- 006WW MWW.4 4N,- 06.. ,WW.a VM MV. W,m60 NNM4 00,WT 0,-NMV ...,. 0,10v-NM a.WAW 600,-N 4.W, M60.-01 v44.0 AW60,- NM66.60 OOOOO 000 .. v-NN NNNNN NMMMM MMMM Maya 444a aaa.. . N N CO N 0 m � C 3 in III • LO 0 a W • 0 0000 0 W W M W . M N V r .-W,N O N W W W O 00000 W,M V a .-.4.0.-0 a 0^O W W,W, 0t0 V.0.-.0 O 0 ,0 ^M 0 .0.-.,NN 0).-WOW V00.- rMON OrWr M.M.- ,MN,W 0M0,0 WN.-00 M0,0M WTN^ WN..V aWNW^ VN 0) TMWAOaTM .-W..-, .-,TWWWWW rOr .0.-VW ^OWM aaN,T MMraW NWWWW MaWM^ NWa00 VM,MW W 0 :3 N N W V M 0 r )W ,..0, 0, a.-W W N W W O N 0-a W N W W O N .0.-.0 W^W T V 0 W N W W M M.O V W V T N V N 0 0 r V qaW, tVW T.-MV i0000.- MWWWO .-MVO, WM.-NM W0,00 .-NVWW WM.-MV NWM.-M MW,TO aWWM ^M 0- 1.. 0WW WWWW WW,r, ,,,WW WWWWT WWMWT MM000 0000.- n, .-.-NNN NMM MM • V ^ VaV n. WWW WWWWW WWWWW WWWWW WWWWW OWWW WW,r, rrrrr ,, Nrrr ,, ,, rrrrr nrrr r ...no WWNWWWWWWWWW WWWWWW0 OOO OOOoO 00600 600^0 OOoOO OOOOO 00000 OOW0 00006 00000 00000 00000 OOO0 O Qn n V 0 d^a.-0 N W V W r r W O M W 0)W,O V 00...- M M N N N .-W a NO W M M O W N M T 0,04.-, ,N W N a N.-NV, .-W a N, N V LOMM ,..-0040 0,0NO N0).-00 M W W O.- 0,000 M W W.-W V03,002 IO^Nr..- W W V0W V rN W. MOWN.- 0 V,V. r0 •- ✓ W M W ^W W V T M.N., W T-M W 0.-.V. `W V W a N 0^W W W O W M r 0 W M.- W M r r M .-0000 r W M M N W W W W W W 0)V O In N W W W ,M W W 0 .0.0, Op W M O W W M M WV.-WV T W N 0) r W M W V O W W M. - 00.-,N ,000W W W,T M WN.-WV. O W,M M W .0 M M N r N W V T W O W 0) ,..-,N W a O W N V.-W V .-W W^W W W W N W IO N W W W V O N .--,m00 W T 0 O W N r N,M W a C VVW 0W„W WM000 NNM MVWWW WrWWM OO.-NN MVVWW W,WWM 00.-NN MVVO WWW WM00^ ^M 0 ^ 00NNN NNNNN NNNNN NNNNN MMMMM 0MMMM MMMMM VVVVV OVVaV VVVVa a00. O J 00^ E,0000 000 00000 00000 00000 00000 0000 OOOo0 OOOOO 0000 OOOOo o0000 ON 060 00006 66666 60000 66666 ..660 00000 00000 00000 66666 60006 66666 66666 66 N W W W W W IO.N W W W W W h.... W W... W.. ..... W W W N ..... W W W N W... .WNWW us.... .. . . i . . . . . . . . . . . i . . . . . . i . i . . . . . . . . . . . . . i . . , i . i . i . . . , . . . . r i . . 0) 0)^V.-T 0.1.4.00 V 0)V N V r V W N M O MOV M W M W N W W W N V M M V M M W W W 0 W.- W.V N^ W N,M M W M M O a O,N N W O r CWMW.7 ^OOOM WN0)W ,M0MV OMWM,- WWW. W 0,-000 NOWW WVW7W OTWWN ,W0)V0 ,V-WOW ^Na VV EaOMO ONVW WNWWM os.-666 OhWWM ,6666 NOW,W ,WMW1� WVMMM WWVNN O,MWO OMONM N6N-W CO A4, Wr0 NWWNW NNWa ,WMW M.-V,0 MVWWO MVW,0) MW,W ONaWW ONWW.- VOW.-V WW.-V, OMr.-V r Nv- WWWW, WWNVa ,NMN.- OOWWW WWVa NT-OM MONWO VMN.- ,-0WW00 WWWa MNN.-O OWWWr MO WWW rrr, ,rrrr ,,,, rWWW WWWWW 00000 .W .W00. WWVVV aaVVV VVVVa VMMMM V0) TWWW0) MMOTT 70)0)0)0) WWWW0) M0)TOT '00)0)0)M 0)0)0)TT 0)TWWW M0)0)TT VWWWN WWWWW VVMMM MTVaVVVaa VVVaa gaaaa VVVaa VVVaa VVVaa VVVaa VVVaa VVVaa VVaa VVVaa Vaa VV 0.-.MV.- W N ,W 'O O W O 666.. M.-0)Nr W W M W O ^W W.-, ,or...., ONWMW r W W O W 66.-mm O r a W 0 O WOW N C?N.M ^IWNN .-O^r OMV OVNOr MNNWM ,VWVO NOrWW 64466 NOV^N 6,646 cor.-^ 666,6 No Or N00WN 1.,6,-:',.6 K,-r-: 4 Wr6aa ^NWV.- r4.-6V O ,MW 4.,666 06.-66 OW6.6 64666 6OOV^ WWC` W WW.-W a.-rata vWV WWWW W.-W.- WOWO. MWaW MWMWM WVOWN VOWN ONWa0 Ora OO 0VOW WWrWW NNMMV ...or WWWWW 0.-.-NN VV WWWWr ,W0)0)o ^NNM VVWW TnWWT ZWWW WWWWW mr,,r, rrrrr, rrrr, rrrrW WWWWW WWWWW WWWWW WWWWT WWWWW .0)TT0) OWWW OO WW WWWWW hWWWW rWWW NWWNW WWWNN WWWOW NNWWW WWWWW WWWW NNW. ..... W W 006 OOOOO 66660 OOOOO 00000 OOOOO 00000 00000 00000 00000 00000 00000 00000 O O 000 WWWWW W W W W W 00000 W W W W W W W W W W 00000 WWWWW 00000 W W W W W 00000 W W W W W 00000 W W W C a N V r N N O r 0 W V N ,N.-W. W a O M W n V W,.W M a O V a '00000) O V N r V 0,,,T-0 O M T V O V N O a M ,C0 W W W 0 o W N N W,M O V M.-V.-0 ,V M 0)a M W N O O 0)r M O N M W T O .0V0, ^N V.-O r W N M 0 N W W Y)W M r T,N V000, ^ O C:1566 G ^Cilli N�. � - .6.-^6 c$666 66664 N NN N N,- MM ^^a.-N 66666 . 6N N.- 6. 66.- 0)000)0) .-.-6, 6. ?�W S N N W 0)7a OV OW ;0420 NVWN WrM N W 22"'41 82201 WWMv W0rWN Nr rW N N W, 8:2010 NM1r WO VW 0)r a o N AO F 0)M 0 04201." 0)NVW r^ N W V OD 0)W W V,- 64.-o66 OD W V M V 66666 WWWO6 66..r: WONWr Oi ^N^ 6.666 4 W O W M 66666 0 0 6 N O .466r: a 6 Or VWWN WWNWM onV.- W.MO, VNOW, OM.-0), WVNOW WWM.-T WaNMO OWWM MONO WMCOWN 0 W MMMpMMMMMMMVaoV VvVVV VVVV. ..H00.O .0NoM0000000 ,, ,,, , r, MM aa0 . OO 0WoO000O0f , ,, , , M W=N V V N W M n W V.-M.-.- W W,M N NN.-ON aWrW.- V.-W M M W NMN M V Orr W ,040.. W V a M r O M N V W W O W M O W Z z..-00M M W W M O�N W N O M W O N N N O M W 0,0.- W W W W r W W W N W T N O ,W W M T ,M W M W ,0 V W a N O W„ W.-, .6466 T V W N I�N,N V 66666 6WNW 666WW 6roDra Or V W, 64.-r:6 a.-1:N W W a W, ,-,:66.- V W W^ aWVNW 6.-666 .-0)NW O W M.-W M W W.-W NO,..-0 V.-,VW OO^WV WM0). ^W.-W.- 00.0. OWOVT MWMWM WOWM0)N.-rN ,NWW.- WV.-WV ^r NNNMMMMMapMMMMMNMMOVVVasaVVVVVVVVOVV00MNNy NMOONNMW 0000OV MMM NOV 00 NN MM 0000 OO d U) M E xV 0)N0 80202 OOM'N QNO)rM 82W°2 220,2 10802 OVi0O' Ota.V.a:N 'V022 m W OODr 1.7418 OrMOW)n r0 Z p .m66O.. rrNN co OrnW 660) 4 '^MN , 0)V MWTM WDNh N0)N 6r-:6.,6^N 0OCTOYO6N O MVNO WWaMW N.OMN OTrWN N,-.-O MWWrW aMMN OWTW ,WWMN .-O „ WWVN.- WWOVN U WW, MMMO^ VNMYV QVVVV .742G0 2122,7; WNNNW 02122ONW0� hrrr rr0WNDm 12202 28 co o. co z Z o^.M.W m^Na co TOrro O V W TM V oN co NN W V racer M^ M co W W W^MT ,-W W W W V,.-M V NO)M0) CO a Samrrr TOMWr OON WWr WWOW 00W0V VNOT0) 000 .M.-MW WMN M- ,0 'M,0 WWWN WO CO Q TOO V r0 Cr666 Ci 4666 COWM0M MN r Nr 6,NW.- W O 064 W N N^ 0 W 0)W.- W 006 64,-:04 <--:6600 M n W nNWWO aMMNW Wr66 WWWaa CONN 000)0) WW,rW VaM MNN^.- O0TTW CON W W W V V M N N .-0 M M M Ma)Ot V t'0 V V V '0*V V. W U)).OM)0. CO00 N 00 00000 00000000 WM 0,r rr N N N NN W 0000 00000000 W W 000 T 00 C C CO N T 0- W T V M N M 0.T-OM r W V Oto M,..-,V T.-M.V O M M,N W N IO V, N O N.-0) O^a W T N W M W T W W W M M W VO Q W 1�0W V W M WOM W W ,01.-OM MMT.-, W W V ON N V MN O V W W M 0) 00.-0 0 W MW V W NW W ,MO.-M NT W V V 0 W W„ W NM0) W a,-mr 6 666 .-666 V W OiMrN 0-.66 <-:.-6 6 6646 r 666 .-64.6 66.46 6,-:<.i666 L V M N O T W W .VM.-, O,WWV O T W,r W W W IO V M M N N.-0 0MOW,, IO N V V M N.-O T W W,O.V M.-OW, W. Y-. M aM00,0 MO.-NN M M V W W r W T O O N M a W W,W M O N M V W W W r W M O T-N M a n W r r W MO.-NM V W W W, W M M MMM MMM M V V V ,V a V a a V V W W M I O I O W W ....0 W W W W W 00000 r r r,r r r r, ,W W W W W W W W W W W l0 Y_ Z 7 SMn V .-W WON MMM.-.- OTO.W 0.-.-NM .`-MO V N I.mor. MMO V V OM,W M N V,0). TIWONM W V,V V M M.-,MM 0,..- O r0) F- 4N. 6 h W M 64: 66 p,N r 0) . .,,:66 M,6 0) 0) N O r 466.-6 ODMMO W a,v W .6.-60 T O O r W 66601-: 6660,-: 0 N W r W a VWW won,. W0)00^ NNN MMMa VWWWV VVaVM MMN.- MW,,, ,r,00 00000 WWYWW WWW WW MMM MMMMMMMMMMM MMMMMWMMMMMMM0MMMMMMMM MMM MMMMMTM0MMMM 00M M M MCO OM MM ) MM W 90 CO r T.-W 0 L W,OIO CO TTO V N W W W a OQO W 0)0000 ONO V Mr^^ MT0)^N ,N^aM W V W Mr .-0)0)W, NT W.0N N T W NMN, W W N W 0 ,V.-OM N W W r V .66<-:0 ONO., 0 0.661-: V M V M r O N W ..-,NV 0)M O 0)10 W W N O a V N M W O W 0 666 -66.6 W O N N V O V N. '4646 W^Mh0 N 6 W r 0 ^-6666 0.6 6 1h6. 466 66,:66 WW.66 66.64 W,T N V 66 , V V�O 00... .M M N N 0 0 0 N h ....0 T M 0 0 h NNN h 0 0)0 0 0 0 0 0.0 N NNN N W W W W W ..00. M W W W .... 000.-.-0.W W ^ M M M M MMM M M M M MMM M M M M MMM M M M M M M MMM M M MMM M M MMM M M M M M M M M M M M M M M d e•-V V Ma W MN V 0)N O O M M W T 0)0)V T M M M W. 0 r a N O W,W0 0)fW O` 0.0V. 0)O N W N ONO M pNWN V W O 2•-MN.- )r .- NM W,WW oO0O WMWT^ rW00) -0W ,M M ONWW 0) OO F 6.6 .-NMNV VaaMM 66 ,-.- 666-6 .6-66 0666 0 0)6.-64 ,-N 66.64 66-66 6.1-:00 NN CO M M COM CO oM N00000 N W M WM NNN NN M M MW MM .-0000 66666[ COMMMM COMMMMM MMMMM COMMMM CM MM M 6 MMMMM 66 13. <0',,6 .06',,, .•,-,0 T W r r a O N W O 00,0,-N NOM 0) ..VON W T-W r T- O V r a.- M V Ya W V N W W O .-.-000 0 0 0 M W E.,,..-VM ,.-TV NMOa^ OTN MMM VVrN NMO ON, ...or OW NMNOV WrMW WWVW WWW 6 ,..:,-: 0 0 m00 06600W0606066066006666WW66,-:06 000 0006 00000 0006 OhW06 W 66 00 6 W00W 066 2, M .MONO 7 W W rMO W T OMWOM NV MO ANDNVO .-.000 .0,0 W ,O0 W..-.-QT.. W , ONV7M OMNN7WWO W0 .-NM,, OMNMMO 6 V 6N W 66666 66661-: Nr‘ W.- 0-0-6 .-66.6 6666 6.646 464646466. 66666 6-6 W^ 46,-46 N N.- O O T W W ,00..- h«00 OW r ,00.. V V M N NN.-00M QO O T r W W W W V a M M N N M M W,,W W .V VWW ,WWTO WMata hWnWM MO.-NM VWW,W TOT-NM ...On., W0 0^N TV0Wr WTO,-N Ma.00 nTO O 0WW WWWW WWWW WWWWW Wrrr, ,,,r, WWWW WWWWW MM TTMM M M 0 0 0 N 00000 lV 0 N 0 0 000.-.- N N N N N N NNN N NN , M M N W U_ C 01 0 410 411 Ls, O pp �tpp {�SCO rp m p� in 2...COD N)0 tp*RA{vp00 O0Y I-(fp0) ROOOD W C') A0m0)tpn-fnaO- )W.atm!• W^p�i�Onp N N 00O pvp0 No ac X ^2m 380822 .00N A IQ.I- °I.'!2882 2 ON O 28238 00000 2:2f )P. O N G J A AA Ann nn nn,NN Ann ww GDW O N GD OD W W .00 0 0 0)30.0 un sr,W WM 00000 00000 66666 0 0 W M 000 666 O 0^0 0 0 66666 OOOOO O O O O O O O O O O O O O O O 66666 O O Q V O 4 Wp8^ �CrONMOOp 0ppp2 t pMg .2pO .TV4Op p21ItO 8 0 '42c93232 W�ONW F;2 n WtO. 0,, . NDVMM ,WNGM WQONO CONQO .gp W00VV MO c a NNN 01.0WmN 0000 OOV0 00r • 000r00N nq 0 J 00(0820.OOOO000. 00O0OOO00O .0OOO0OOOOOC0 OO pGo hmmoppppppOOm 22222 pppopCppGo ppCOpGNONNN Oop N C WOQyy)GQ~D ON.OA 6p44nn mtp NPO] r 0tC00 i00i C0')00 0)CONM).WOW n.Oq,N M N0 W s tnMN MNMMM MNNNN W NNN., ,,NN 0 74 0) 1 n 22$4'l�f 0)c7404 0 00)) 00)0) ..... 0)0 O 0)0) ..... O O)0)O 0. ..... 0 0)O)m O) 0000)0 m m .4-0.0 0)0)0)0)0) Q Q Q Q Q Q p Q Q Q Q O Q Q m e Q Q a m Q Q Q W Q Q Q Q Q Q Q Q Q WV O=0,.M_ al, tM.rr vv0)to We.NNV 44 c.O.r.d:�A O),'..-.MN a AaDe t00. Nr)v0).0q� i/66m.- Nyq N Ar n ON t "2 O W 422 2101 NN MOpf�' l`n')O<VW) t$21t pAO NOW MOOT .0N 3NN Rm r'••fpp�0)N pNp tO')pQppp W .pO pA pA W p� t0) W m O)007NMMQN .04 tp04 22 z tD.0O.0c tD.00.0.0.00 .0.0.0.00 Orrrr WW MCI 30000 00000 NN SSS S2SSS S8S28 dea S§ CI S§$$S 3322 -1^rneM ,.:rn'oe °oMOo, MNMOr inrl00cCC N4...,- mw000 ,r-),0O0 eO 0 Orr r N,N., 6,-,-6,-: r O ro..0 6c4NNO .. .. 6.Or rGGMO 4•-66N 60 C. 3M M M M ) 3333 Z1Z Z j N NNN N tmAWnW N CI. 0 0.. O. MR NNOATAONA!8 NNWGRO WrWNA meg; mANOppO IAANpp QQN Y MMMMM 2 333 e2 . 0OgApgW012 <Wm GDWmpOrggg f000O) WT00 00000 00 1 rrr ....rrrrrrrrrrr NN NNNNN NN p NNNN . . . . . . . , . , . . . aaaD.a WVW0W ONt.yy M ZNNOmOmm nM. p yypN0 r0rNr NAMmr0MONC WMol. 0r .m mol . ' Om,. CDOOX OOp Z O6.. 6,NNO WO • WAm QONfN NWtto.-c446C gIggN gpD 832g'S 1rQA N, A QQmW% WOO $ 2t5222 22 nI.nNNN0 V voW Y � � � pp >>> a n OONR . 2 2 W NO a<AocT' M mvpCNnM 000MNApN0ry0WNn ONNr03�Op mr OO0 0002_ 2 0OM0) t00N.O t00O1. .. Nm222J N NO WWrW OnthOW MNON WQ,OA Wn,mn LOAMOf Qr0)n NW I I Im N QW .OwNr Wm00mM Cl_pmp. . AT000WrNMQ Wnw O17 NNNN mU OTN OOOM m00 0000 000 NNN ..... r.....-NN NNNNN NNNNN NNNNN NNNNN NNNNN NN y N co Wy 4 . M G^MpN NAWWO OWnrSSOMOW ,t'?-r, nrWWO WWNOm WNWQW WW ,no,nOO E^OOOd =88NCo 70rN CON Q 6Mr- O2OM WOMWO MpOOMO (ItOp.i 666WO M.gc. p6.4WN AC " �ONN Vi=e-nM a pWnWp0000OOONMONm nmWNNNNONpMNOW cf) OOOWO00RO rrr rrNNN NNNNN NN;NN NNNNN NNNNN NNNNNNNN NM O L *',:_in �� O m m m N a T a a WJWMR NQOANS248M2VG2p ppMpp1:4'' OMOm 8oP,l 'Q<NQH MN OORNh Yp ppNp ' Ol2pNMa ODWrWWYrp0N) OO8228 00000 0000 Or d tN' ONNNNNN S2-\\:,,rrtV NNNNN NNNNN NNNNN NNNNN NNNNN NN i W z N p (p �pp .y/, y�VN1 Y M 0.-.AmN.WOOm RN)�v)M. r M.pr O MmCDQ O I,,,,-*-O M.O 07.0..R9 .P NOGWD)W. NN ri g C e b E e W H tNp.rp 1pp {p .'�N OiN MtG�pN O)W O W ^^ O A p .pp{Mp M p.p .Gpp�[f r n .�0 LL 301 fp 10 f0 •- .O N N i[) ... h 0)0)0 .0.0..0 0 n 0 .0 0.0 0 m 0 W 0) 0 0 0 0 0 NNNNN 0 0) O .5.01515z co -c Q Q Q Q Q Q d_ M M M M MMM M M MMM M M MMM M MMM M M MMM M M MMM M M MMM M M M CO — A m N E C > Gp <.} tp Q .p p LL (,)„.1M,4 004)00 00)000 On ON.WO0) GAO<QAO M Qm0004) 00MMW ROORR 0020 0 tet;00.00 0 W A A TO.A6N 6GCTTT r-:6664 TGG6M .-r.-CO 000.71A 60)r 64 NGC OM A O r n . MMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MM N —AAw�M d °---"t°88 v 2 D OW Q JN OMP2612%1 DIR: M P-,W4N O emtzN O N�NO g.sMN6W.00WW0 g 0§p F2g O Z W 3 QWW 146 6nT^6 MNNNr NNMM66rrN NNNM 46644 4666r rre O O 4. OLONT W MMM MMM MMM M MMMM MMM MM MMMM M CO fA rNWQOZ N N Q O • LLN r 0J ( > P. • WY00 y" M00Opmp 1<< 0000O 03.-0N�mWW <4ONArQQ • wC . q00 070 . ( 0400nO .WG0W O o NO R OGm.W .OppGpmmmNpOmpOOOmo ANM0 OW mmmmWO00OOmOA0W0D cDGDmWAmN ON ;!NO O O M p W 2M QLL T in' 0 N O p C O N N U f Cmw� Wr 0004 r 0 V...0pp0)pON 00007 00,00( 04 OtWMW R.•11W.O4) OON.MO.0 NO .�U S QNB W Of OfN �NNNN NNNNR MNMN 217117.O') $4:1;.1 aROd R Oy O W-W ON NNN NNNNN NNNNN NNNNN NNNNN NNNNN 0004“0 0040004 N N 0 , Crl In m co N n J N O AW U 4 `C OO` Q Eo rr rn or 0 C.) 0 0 0 • • 9(5f3L 15 5(0 HALLIBURTON en ii Einill Petirolleuim Sperry Rrillin RECEIVED PACKING LIST S E p 2 9 2015 Spy Island Drillsite A QZ Nikaitchuq SP28-NW3 Shippi WI-Sep-2015 Spy Island,Alaska Ship From: Ship To: ENI Petroleum AOGCC C/O Sperry Drilling Alaska 333 West 7th Avenue; Suite 100 6900 Arctic Blvd. Anchorage,AK 99501 Anchorage,AK 99515 Attn: Meredith Guhi 907-793-1235 description Interallat Packaging Box Despt on SP01-SE7 MD Washed and Dried Samples-S0' 2850'-5750' Paper envelopes 1 of 6 Washed and Dried Samples-50' 5800'-9200' Paper envelopes 2 of 6 Washed and Dried Samples-50' 9250°-13150' Paper envelopes 3 of 6 Washed and Dried Samples-50' 13200'-16750' Paper envelopes 4 of 6 Washed and Dried Samples-50' 16800'-20750' Paper envelopes 5 of 6 Washed and Dried Samples-50' 20800'-24989' Paper envelopes 6 of 6 One(1)Bundle Contains Bundle 1-Six(6)Boxes Notes: Total Packages this Shipment: 1 Please notify sender upon receipt of delivery; Josh Zuber RECEIVED 907-223-6659 OCT 9 2015 Received by Expediter: Date: � r� T III I 1111 .....IIII MI1111111 PRO HO659109SHIDDA VERYRE4 EI '15 • ;;AM 1800 E. 1st Avenue •Anchorage,AK 99501 ORIGIN: PRU TERM, AK DEST: ANC TERM, AK Phone(907)276-7797^Fax(907)278-7301 907-659-2398 907-276-7797 CARLILE TRANSPORTATION SYSTEMS, INC. FOR CUSTOMER SERVICE, CALL 888-399-3290 OR VISIT www.carl i 1 e.bi z p... ....�1:i�i...migmamaTIME: ENI PETROLEUM s DOYON RIG 15/ENI PETROLEUM g AOGCC 3800 CENTERPOINT DR " OLIKTOK POINT/SID/DRILLING N333 W 7TH AVE L STE 300 P C/O ENI SPY ISLAND DRILLING STE 100 N ANCHORAGE AK 99503 a PRUDHOE BAY AK 99734 N ANCHORAGE AK 99501 G 907-865-3300 R SATCH AND TOM E 907-685-1226 E PCS UNIT H/M DESCRIPTION OF ARTICLES AND SPECIAL MARKS WEIGHT(LBS) RATE CHARGES 1 EA 6 BOXES OF WASHED & DRIED SAMPLES 106 FSR—A34,SPZ8—NW3L1 21N X 21N X 181N CUBE: OFT3 I eft **HIGH CLAIMS RISK, HANDLE WITH CARE** 1 106 Page 1 of 1 ALL FREIGH I DESCRIBED ABOVE RECEIVED IN GOOD CONDI I ION WI I H SHRINK WRAP/BANDING IM1ITAC I EXCEP I AS NOTED. ADDITIONAL SERVICES PERFORMED- SIGNATURE: DATE: _ ADDITIONAL CHARGES MAY APPLY e 1—` 3 n RES LTD ACCESS PRINTED NAME: TIME: 1�, � $ ,r-`- n LIFTGATE n INSIDE PIECES DELIVERED: i INITIALS: DRIVE 9 f S5 its7APPOINTMENT x EXCEPTIONS: ° 7 E OTHER: Pti ®F�Tit� THE STATE Alaska Oil and Gas „���\\I//rte s� (..,.../04,,_-.......„4,,,,•' of Conservation Commission issio LAsKA .4 --_AIS t _ri. 333 West Seventh Avenue _:-__._,__:_,,, � � GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 , ...; Main: 907.279.1433 ALAS11 Fax: 907.276.7542 www.aogcc.alaska.gov Bruno Ravagli Drilling and Completion Superintendent ENI US Operation Co. Inc. 3800 Centerpoint Drive, Suite 300 Anchorage, AK 99503 Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP28-NW3 ENI US Operating Co. Inc. Permit No: 215-134 Surface Location: 4440' FSL, 1429' FEL, SEC. 19, T14N, R9E, UM Bottomhole Location: 3106' FSL, 1264' FEL, SEC. 9, T14N, R8E, UM Dear Mr. Ravagli: Enclosed is the approved application for permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i°92e vd.- Cathy P. oerster ,. �y/� Chair DATED this S day of August, 2015. • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION JUL 2 9 2015 PERMIT TO DRILL /�/�/�► ( i 20 AAC 25.005 A®4.'71C la.Type of Work: 1 b.Proposed Well Class: Development-Oil Q • Service- Winj 0 Single Zone Q - ''.1c.Specify if well is proposed for: Drill ❑✓ Lateral 0 Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service- WAG ❑ Service-Disp ❑ Geothermal ❑ Shale Gas 1:1_ 2.Operator Name: 5. Bond: Blanket Q ., Single Well 0 11.Well Name and Number: ENI US Operating Co. Inc.._ Bond No. RLB0008627. SP28-NW3 . 3.Address: 6. Proposed Depth: 12. Field/Pool(s): 3800 Centerpoint Drive Suite 300,Anchorage 99503 MD: 25344• TVD: 3582 • Nikaitchuq/Schrader Bluff • 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: 4440 FSL, 1429 FEL,S19 T14N R9E UM - _ ADL 388572,ADL 388574,ADL 388575,ADL 388583,ADL 391283 Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 2581 FSL,4934 FEL,S14 T14N R8E UM ADL 417493 8/8/2015 Total Depth: 9.Acres in Property: 14. Distance to Nearest Property: 3106 FSL, 1264 FEL, S9 T14N R8E UM . 10842 1408'to unit boundary 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: . 54.1 feet 15. Distance to Nearest Well Open Surface:x- 511482 y- 6053621 Zone- 4 - GL Elevation above MSL: , 13.1 feet to Same Pool: 1344'to 5126-NW2 16. Deviated wells: Kickoff depth: ' 300 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: i 91.85 degrees Downhole: 1601 psig Surface: 1210 psig_ 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" 178.89 X-65 Welded 124 36 36 160 160 Pre-Installed 1110 TOTAL sx 16" 13-3/8" 68 L-80 BTC 2749 35 35 2784 2454 LEAD:883 sx 10.7 ppg ASL TAIL:227 sx 12.5 ppg Deep Crete 851 TOTAL sx 12-1/4" 9-5/8" 40 L-80 Hydril 563 16377 33 33 16410 3592 LEAD:619 sx 12.5 ppg DeepCrete TAIL:233 sx 15.8 ppg 8-3/4" 5-1/2" 15.5 1 L-80 Hydril 521 9134 16210 3584 25344 3582 Liner in open hole 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect. Depth MD(ft): Effect. Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑✓ BOP Sketch ✓ Drilling Program Time v. Depth Plot Shallow Hazard Analysis✓ Diverter Sketch e✓ ../Seabed Report Drilling Fluid Program e 20 AAC 25.050 requirements✓ 21. Verbal Approval: Commission Representative: Date 7/29/2015 22. I hereby certify that the foregoing is true and correct. Contact Andrea Lazzari 907 865 3323 Email andrea.lazzari(aenipetroleum.com Printed Name Bruno Ravagli /�f ' Title Drilling&Completion Superintendent Signature Q)..�� ) Phone (907)865-3325 Date 7/29/2015 Commission Use Only Permit to Drill _ API Number: Permit Approv See cover letter for other Number: ,2 i S - /? 50- 9 - 3 5-5 -O --CIO Date: I1 fj requirements. Conditions of approval: If box ischecked,well may not be used to explore for,test,or produce coalbed methane as hydrates,or gas contained in shales: Other: s 350, ,3 �' o r ,_ Samples req'd: Yes❑ No[ Mud log req'd: Yes ❑ No I y /JH2S measures: Yes ElNo� Directional svy req'd: Yes [ No❑ Spacing exception req'd: Yes❑ No 11113 Inclination-only svy req'd:Yes❑ No[/ APPROVED BY _ Approved by:(1P9COMMISSIONER THE COMMISSION Date: -, - K�i 3 5_ RIG I N A SubmitFormand Form 10-401(Revised 10/2012) This permit is valid for ms from the date of approval(20 AAC 25.005(g)) Attachments in Duplicate • • P-fRileniEnli trokum 3800 Centerpoint Drive Suite 300 Anchorage,Alaska 99503 Bruno Ravagli Phone(907)865-3325 Email: Bruno.Ravagli@enipetroleum.com July 29,2015 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue,Suite 100 Anchorage,Alaska 99501 RE: Application for Permit to Drill Producer SP28-NW3 J Dear Commissioners, Eni US Operating Co.Inc.hereby applies for a Permit to Drill for the Offshore Producer well SP28-NW3. This well will be drilled and completed using Doyon 15.1The planned spud date could be as early as 08/08/2015. Please find attached for the review of the Commission forms 10-401 as well as the information required by 20 ACC 25.005. If you have any questions or require further information,please contact Andrea Lazzari 907 230 7511 Sincerely, Bruno Ravagli Drilling&Completion Superintendent • • *4!. Eni (= tIr'oHeum Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 Application for Permit to Drill Document Producer Well SP28-Nw3 Table of Contents 1. Well Name 3 Requirements of 20 MC 25.005(t) 3 2. Location Summary 3 Requirements of 20 MC 25.005(c)(2) 3 Please see Attachment 7:Surface Platt 3 Requirements of 20 MC 25.050(b) 3 3. Blowout Prevention Equipment Information 4 Requirements of 20 MC 25.005(c)(3) 4 4. Drilling Hazards Information 4 Requirements of 20 MC 25.005(c)(4) 4 5. Procedure for Conducting Formation Integrity Tests 4 Requirements of 20 MC 25.005(c)(5) 4 6. Casing and Cementing Program 5 Requirements of 20 MC 25.005(c)(6) 5 7. Diverter System Information 5 Requirements of 20 MC 25.005(c)(7) 5 Requirements of 20 MC 25.005(c)(8) 6 Surface Hole Mud Program (extended bentonite) 6 Intermediate Hole Mud Program 6 (LSND) 6 Lateral Mud Program 6 (MI FazePro Mineral Oil Base) 6 8. Abnormally Pressured Formation Information 6 Requirements of 20 MC 25.005(c)(9) 6 9. Seismic Analysis 7 Requirements of 20 MC 25.005(c)(10) 7 03_AOGCC PERMIT Document Page 1 of 10 Printed:28-Jul-15 • • • Enfl Petrolleum era Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 10. Seabed Condition Analysis 7 Requirements of 20 MC 25.005(c)(11) 7 11. Evidence of Bonding 7 Requirements of 20 MC 25.005(c)(12) 7 12. Proposed Drilling Program 7 Requirements of 20 MC 25.005(c)(13) 7 13. Discussion of Mud and Cuttings Disposal and Annular Disposal 7 Requirements of 20 MC 25.005(c)(14) 8 14. Area of Review 9 15. Attachments 10 Attachment 1 Drilling Procedure 10 Attachment 2 Directional Plan 10 Attachment 3 Drilling Hazards Summary 10 Attachment 4 BOP and Diverter Configuration 10 Attachment 5 Cement Loads and CemCADE Summary 10 Attachment 6 Formation Integrity And Leak Off Test Procedure 10 Attachment 7 Surface Platt 10 Attachment 8 % Mile Scan Report 10 Attachment 9 Casing Design Program 10 03 AOGCC PERMIT Document Page 2 of 10 Printed:28-Jul-15 _ • • • Enil Petroleum en El Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 1. Well Name Requirements of 20 MC 25.005(f) Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 MC 25.040(b).For a well with multiple well branches,each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. Well Name: SP28-NW3 2. Location Summary Requirements of 20 MC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (2)a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface,at the top of each objective formation,and at total depth, referenced to governmental section lines. (B)the coordinates of the proposed location of the well at the surface,referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C)the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface 4440 FSL 1429 FEL S19 T14N R9E UM ASP Zone 4 NAD 27 Coordinates RKB Elevation 54.1 ft'AMSL Northing: 6,053,621' Fasting:511,482' Pad Elevation 13.1 ft'AMSL Location at Top of Productive Interval 2581 FSL, 4934 FEL, S14 T14N R8E UM ("OA"Sand) ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 16,296' Northing: 6,057,032' Easting: 497,612' Total Vertical Depth, RKB: 3,587' Total Vertical Depth, SS: 3,533' Location at Total Depth 3106 FSL 1264 FEL S9 T14N R8E UM ASP Zone 4 NAD 27 Coordinates Measured Depth, RKB: 25,344' Northing: 6,062,842' Fasting: 490,717' Total Vertical Depth, RKB: 3,582' Total Vertical Depth, SS: 3,528' Please see Attachment 7:Surface Platt and (D)other information required by 20 MC 25.050(b); Requirements of 20 MC 25.050(b) If a well is to be intentionally deviated,the application for a Permit to Drill(Form 10-401)must (1)include a plat,drawn to a suitable scale,showing the path of the proposed wellbore,including all adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 2: Directional Plan 03_AOGCC PERMIT Document Page 3 of 10 Printed:28-Jul-15 • • Enil D Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 (2)for all wells within 200 feet of the proposed wellbore (A)list the names of the operators of those wells,to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mail;or (B)state that the applicant is the only affected owner. The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 MC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (3)a diagram and description of the blowout prevention equipment(BOPE)as required by 20 AAC 25.035,20 AAC 25.036,or 20 MC 25.037,as applicable; Please see Attachment 4: BOP and Diverter Configuration 4. Drilling Hazards Information Requirements of 20 MC 25.005(c)(4) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (4)information on drilling hazards,including (A)the maximum downhole pressure that may be encountered,criteria used to determine it,and maximum potential surface pressure based on a methane gradient; The expected reservoir pressure in the Schrader Bluff sand is 0.45 psi/ft, or 8.6 ppg EMW (equivalent mud weight). The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.11), and the planned vertical depth of the OA sand formation is: MPSP = (3,559'TVDss)(0.45 - 0.11 psi/ft) = 1210 psi (B)data on potential gas zones; The well bore is not expected to penetrate any gas zones. and (C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 MC 25.005(c)(5) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (5)a description of the procedure for conducting formation integrity tests,as required under 20 MC 25.030(f); Please see Attachment 6: Formation Integrity And Leak Off Test Procedure Y 03_A OGCC PERMIT Document Page 4 of 10 Printed:28-Jul-15 • • Enil D• e(nn o Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (6)a complete proposed casing and cementing program as required by 20 MC 25.030,and a description of any slotted liner,pre- perforated liner,or screen to be installed; Casing and Cementing Program See also Attachment 4: Cement Summary Hole Top Btm Csg/Tbg Size Weight Length MD/TVD MD/TVD OD(in) (in) (lb/ft) Grade Connection (ft) (ft) (ft) Cement Program 20 Driven 178.89 X-65 Welded 124 36/ 36 160/ 160 Pre-Installed 13-3/8 16 68 L-80 BTC 2749 35/ 35 2784/2454 Surface Lead: 883 sx 12.5ppg DeepCrete 227 sx 9-5/8 12-1/4 40 L-80 Hydril 563 16377 33 / 33 16410/ 3592 DeepCrete Lead: 619 sx 15.8ppg Tail 233 sx • 5-1/2 8-3/4" 15.5 L-80 Hydril 521 9134 16210 / 3584 25344/ 3582 Liner in Open Hole-no cement 7. Diverter System Information Requirements of 20 MC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (7)a diagram and description of the diverter system as required by 20 MC 25035,unless this requirement is waived by the commission under 20 MC 25.035(h)(2); Please see Attachment 4: BOP Configuration. 03_AOGCC PERMIT Document Page 5 of 10 Printed:28-Jul-15 • • Tivo% en II Enil Petrolleum Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 Drilling Fluid Program Requirements of 20 MC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (8)a drilling fluid program,including a diagram and description of the drilling fluid system,as required by 20 AAC 25.033; Drilling will be done with muds having the following properties over the listed intervals: Surface Hole Mud Program (extended bentonite) Spud to Base of Permafrost Base of Permafrost to Casing Point Initial Value Final Value Initial Value Final Value Density(ppg) 8.8 9.2 9.2 9.5 Funnel Viscosity 150 250 200 300 (seconds) Yield Point 50 70 30 50 (lb/100 sf) Plastic Viscostiy 30 55 15 20 (CP) pH 9.0 9.5 9.0 9.5 API Filtrate NC 8.0 8.0 8.0 (cc/30 min)) Intermediate Hole Mud Program Lateral Mud Program (LSND) (MI FazePro Mineral Oil Base) 13-3/8"Csg Shoe to 9-5/8"Csg Point _Value Value Density(ppg) 8.7-9.4>" Density(ppg) 8.8 - 9.5 Plastic Viscostiy 1525 Funnel Viscosity (CP) (seconds) 45 60 Yield Point Plastic Viscostiy (lb/100 sf) 14 20 (CP) 12 18 HTHP Fluid loss Yield Point (ml/30 min @ <5.0 (lsf) 18-24b/100 200psi&100°F API Filtrate4 - 6 Oil/ Water 60/ 40 (cc/30 min)) Ratio Chlorides(mg/I) <500 Electrical >600 pH 9.0 - 10.0 Stability MBT <18.0 Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. 8. Abnormally Pressured Formation Information Requirements of 20 MC 25.005(c)(9) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (9)for an exploratory or stratigraphic test well,a tabulation setting out the depths of predicted abnormally geo pressured strata as required by 20 AAC 25.033(f); Not applicable: Application is not for an exploratory or stratigraphic test well. 03AOGCC PERMIT Document Page 6 of 10 Printed:28-Jul-15 • • oviiit lip • Eiridi Petrolieum en II Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 9. Seismic Analysis Requirements of 20 MC 25.005(c)(10) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (10)for an exploratory or stratigraphic test well,a seismic refraction or reflection analysis as required by 20 MC 25.061(a); Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seabed Condition Analysis Requirements of 20 AAC 25.005(c)(11) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (11)for a well drilled from an offshore platform,mobile bottom-founded structure,jack-up rig,or floating drilling vessel,an analysis of seabed conditions as required by 20 MC 25.061(b); Not applicable: Application is not for an offshore well. 11. Evidence of Bonding Requirements of 20 MC 25.005(c)(12) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (12)evidence showing that the requirements of 20 MC 25.025{Bonding)have been met; Evidence of bonding for ENI is on file with the Commission. 12. Proposed Drilling Program Requirements of 20 AAC 25.005(c)(13) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: Please refer also to Attachment 1— Drilling Procedure , 1) Move in/ rig up Doyon 15. �t'�,, L' 2) RU Diverter and test as per AOGCC requirements. tt L' 3) Spud and directionally drill 16" hole to casing point as per directional plan. Run Gyro and MWD tools as required for directional monitoring. 4) Run and cement 13-3/8", 68#, L80, BTC casing to surface. Pump cement and displace with mud, land casing hanger and bump plug. 5) Install and test wellhead to 5000 PSI. 6) Nipple up 13-5/8"5K BOP and test to 3500 PSI. Notify AOGCC 24 hrs before test. 7) Pressure test casing to 2500 psi per AOGCC regulations. Record results. 8) PU 12-1/4"bit and directional drilling assembly with MWD, LWD and PWD. 9) Drill out cement and between 20'and 50' of new hole. Perform formation integrity test, recording <: results. Min LOT= 11 ppg. 10) Directionally q-11 11—t7: 8"8"casing point per directional plan. Pull out of hole backreaming to the surface casing shoe. 11) Install 9-5/8"casing rams in the BOP and test to 3500 PSI. 12) RU casing drive system. 03 AOGCC PERMIT Document Page 7 of 10 Printed:28-Jul-15 • %oat Enli JL o Petroleum eno Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 13) Run 9-5/8", 40# L80, Hydril 563 casing to setting depth. Pump cement and displace with mud. Bump plug with casing on depth. 14) Install 9-5/8" Emergency Slips. 15) Install 9-5/8"packoff and test to 5000 psi. 16) Flush 13-3/8"x 9-5/8"annulus with diesel freeze protect. 17) Pressure test casing to 3000 psi per AOGCC regulations. Record results. 18) PU 8-3/4" bit and directional drilling assembly including MWD, LWD, PWD and rotary steerable tool. RIH, clean out cement to top of float equipment. 19) Drill out cement and between 20'and 50' of new hole. Perform formation integrity test, recording results. Min FIT=_12_1_93p . 20) Directionally drill 8-3/4" hole to TD as per directional plan. Pull out of hole backreaming. 21) RU to run 5-1/2"slotted liner 22) PU and run 5-1/2"slotted liner to TD. 23) Land liner, set liner hanger with 200' Liner lap inside the 9-5/8"intermediate casing. POOH laying down DP as required. 24) RU tubing running equipment and run 4-1/2"tubing. Land tubing. Set BPV 25) Nipple down BOP, nipple up tree and test void to 5000 psi for 10 min. • ENI requests that the AOGCC waive surface safety valve requirements per 20 MC 25.265. (c). (1). w t) �Y • The Vetco horizontal wellhead utilized physically prevents locating the SSV in the vertical run of the Lel �vtree as there is no vertical tree on this wellhead. 1A.) • Wellhead schematics should be on file with the AOGCC. 26) Pull BPV and set TWCV. 27) Fill tree with diesel and function valves. Test and chart tree to 500 psi for 5 min. Test and chart tree to 5000 psi for 15 min. 28) Pull TWCV. 29) Freeze protect well with diesel by pumping into 4-1/2"x 9-5/8"annulus, taking returns from tubing. 30) Set BPV and secure tree and wellhead. 31) RDMO 13. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 MC 25.005(c)(14) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (14)a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 MC 25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of by injection down an Oliktok Point or Spy Island Class I disposal well. Alternative disposal method will include hauling the fluids to the Prudhoe Bay Grind and Inject Facility. 03 AOGCC PERMIT Document Page 8 of 10 Printed:28-Jul-15 • • Eni H4) =-Jtrolleum Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 14. Area of Review Requirements of 20 MC 25 To the knowledge of Eni US Operating Co. Inc. there are no other wells completed in the Schrader Bluff formation other then those stated in the attached 1/4 mile scan report. The Nikaitchuq Unit also includes the following wells drilled by Kerr McGee Oil &Gas Corporation: Nikaitchuq #1: Plugged and Abandoned 04/01/04 Nikaitchuq #2: Plugged and Abandoned 04/01/04 (East of Nikaitchuq Unit) Nikaitchuq #3: Plugged and Abandoned 04/26/05 Nikaitchuq #4: Plugged and Abandoned 04/21/05 Kigun #1: Plugged and Abandoned 03/30/05 Tuvaaq State #1: Plugged and Abandoned 03/09/05 To Eni US Operating Co. Inc.'s knowledge all wells have been cemented across the Schrader Bluff formation as per AOGCC regulations and plugged and abandoned. All wells that fall into the 1/4 mile radius said herein have been drilled and completed in the Schrader Bluff formation in accordance with 20 MC 25 AOGCC regulations. Please See attachment 8— '/a Mile Scan Report 03 AOGCC PERMIT Document Page 9 of 10 Printed:28-Jul-15 • • • EnilPetrolleum Application for Permit to Drill SP28-NW3 Saved:28-Jul-15 15. Attachments Attachment 1 Drilling Procedure Attachment 2 Directional Plan Attachment 3 Drilling Hazards Summary - Attachment 4 BOP and Diverter Configuration Attachment 5 Cement Loads and CemCADE Summary Attachment 6 Formation Integrity And Leak Off Test Procedure Attachment 7 Surface Platt Attachment 8 % Mile Scan Report Attachment 9 Casing Design Program 03_AOGCC PERMIT Document Page 10 of 10 Printed:28-Jul-15 • • Attachment 1 Drilling Procedure • • Of* 2nn �S opereong WELL SP28-NW3 Drilling Procedure SP28-NW3 Spy Island Conductor slot #28 Reservoir location #NW3 Producer (Schrader Bluff) Nikaitchuq Project SP28-NW3.Drilling Wellplan Page 1 of 39 07/29/15 lim** • • e n o us operr hng WELL SP28-NW3 /114041, Spy Island Nikaitchuq Field Pft ` 0e(ftJir`i1ii1 SP28-NW3 North Slope - Alaska DIR/LWD FORM DEPTH HOLE CASING MUD INFO MWD MD TW) SIZE SPECS INFO Cerrent to Surface 20" 0 Hole Angle c X-65 0" 20"Conductor Shoe 160' 160' DrNen Welded N/A GR/Res VSurface Csg Dir/PWD 2 o0 13-3/8" rn 688 MW(ppg) Wellbore Stability Mud Motor 8/Permafrost 1,860' 1,764' r L-80,BTC 8.8-9.5 Lost Circulation Hole Cleaning uu'i Casing Sections KOP:300' Casing Wear RS: Surface T/Tai Cement 2,279' 2,112' 0-3.25°/100' Hole Angle 55.35 Deg 13-3/8"Csg 2,784' 2,454' 16" 50°F WBM GR/RES/PWD Inter,Casing Wellbore Stabiity 9-5/8" Lost Circulation Exceed900 SII 400 MW(PPM Hole Cleaning 1.80,Hydril 563 8.8-9.5 Torque&Drag Casing Sections Tangent Angle: _ Casing Wear 87.50 Deg _ BHA Expense Intermediate TOC 13,845' 3,282' Pick-up Top of Sand —..........--i 5, +r:-s r'- N Top 14,845' 3,471' Intermediate T/Tail Cement 15,910' 3,571' Hole Angle TOL 16,210' 3,584' 87.50 Deg 9-5/8"Csg 16,410' 3,592' iii 12-1/4" 85°F WBM GR/RES Ecoscope/PerACOPE' EEl Wellbore Stability I I Lost Circulation I I Slotted Liner Hole Cleaning I III 1 5-1/2" Torque&Drag EX 1 1 X 1 15.58 MW(ppg) Casing Sections Xceed 675 Pi I I L-80,Hydril 521 9.2-9.4 Casing Wear D I I BHA Expense I 1 4 1 Liner shoe TD 25,344' 3,582' . � Hole Angle 90.01 Deg 8-3/4" 85°F MOBM SP28-NW3 Drilling Wellplan Page 2 of 39 07/29/15 lats. • us ©pacing WELL SP28-NW3 Table of Contents WELL PLAN SUMMARY 4 MIRU SECTION 6 SURFACE SECTION 7 Surface Drilling 8 Surface Casing 11 Surface Cementing 14 Pick Up Intermediate Drilling Assembly 16 INTERMEDIATE SECTION 17 Intermediate Drilling 19 Intermediate Casing 20 Intermediate Cementing 23 Pick Up Production Drilling Assembly 25 PRODUCTION SECTION 26 Production Drilling 28 Production Liner 29 ATTACHMENTS 32 Recommended Drilling Practices 33 Health, Safety & Environment 34 Safety Meeting Topics 35 Well Shut In Procedure While Running Production Tubing 37 Conductor Broach —Contingency Cementing Plan 38 TAM PORT COLLAR Utilization Decision Tree 39 SP28-NW3 Drilling Wellplan Page 3 of 39 07/29/15 1001/49 • @(no us operating WELL SP28-NW3 WELL PLAN SUMMARY Rig: Doyon 15 Type of Well: Producer Well Design: 13-3/8"Surface x 9-5/8"Intermediate x 5-1/2"Liner Close Approach and Offset Well Interception Risks It is important to stay as close as practical to the planned directional program. The directional program and a summary of close approaches can be found in the attachments. These close approaches will be in conformance with the minimum well separation criteria detailed by the Drilling Anti-Collision Analysis and Close Approach Guidelines. It is the responsibility of the Directional Driller and the Drilling Supervisor to ensure that the directional plan is executed as planned,that the position of the well as it is drilled is monitored on an anti-collision diagram and that no tolerance line for close approach wells is crossed. It is important that the well bore remains close to the planned well path as any major deviations from the profile may adversely affect the ability to drill future wells and still adhere to the current close crossing guidelines. Survey Program & Procedures Take MWD surveys as frequently as needed,but no less than every 100 ft. Carefully review the anticipated close crossings with existing wellbores and future well paths. Make sure that directional drillers are aware of all drilling close crossing issues,hard lines and no-go lines. If a no-go or hard line has been or will be crossed,stop drilling immediately and contact the Drilling Superintendent to discuss options. Mud Logging Program Mudlogging will be utilized from spud to production hole TD. Refer to the Geological Mud Logging Procedure document. SP28-NW3 Drilling Wellplan Page 4 of 39 07/29/15 VI41 411) - • em us op&curt ng WELL SP28-NW3 OBJECTIVES: 1. Drill the well at or under AFE cost and time. Perform work in a safe and professional manner meeting all ENI Petroleum Health, Safety, and Environmental requirements. 2.Land Intermediate casing point within 100' radius of the planned directional target. 3.. Land the Intermediate hole section with the targeted inclination of 85°-87° within the OA sand. Maximum dogleg severity shall be no greater than 3.5°/100' DLS in the lateral section. 4. Target Greater than 90%within the OA sand Reservoir. 5.. 8-3/4" hole LWD Failure Requirements: GR/Res/Dir/PWD—Require GR/Res/Dir to achieve TD. SP28-NW3 Drilling Wellplan Page 5 of 39 07/29/15 • vAif,* eni us operating WELL SP28-NW3 MIRU SECTION OD WT Grade Conn. ID(in) Collapse Burst Tensile Yield (in) (PPI) Type (psi) (psi) (kips) 20 178.89 X-65 Welded 18.25 3240 4980 3417 1. Confirm that the identification markings on the conductor match the planned surface location with the "as-built survey." If identification markings are not present on the conductor, contact the Drilling Supt. prior to moving the rig onto the well. ➢ Each conductor is to be marked with a common pad elevation survey mark by the surveyors ➢ Surveyors to also mark each conductor with a degree of angle to set each horizontal wing valve 2. Move in and rig up. Record move distance and rig floor distance to pad and sea level in WellView and on IADC reports. Initiate a Rig Elevation Record and place it on the N drive. • Ensure all concerned parties(Directional Drillers,MWD Operators,and Geologists)are using the same rig floor elevation. 3. Post drilling permit in the rig office and company office. 4. Nipple up the Vetco Gray landing ring,Vetco starter head,the diverter spool,and the annular preventer. Function test the system. ➢ Notify AOGCC prior to spudding well and 24 hours prior to performing diverter function test ➢ Test lower seals of the starting head to 80%collapse of the pipe,but do not exceed 500 PSI. ➢ Confirm proper signage is on the pad indicating the rig has diverter equipment rigged up and to restrict access to diverter line area ➢ Place drip berm under the end of diverter line 5. Verify that two 3"threaded nipples have been welded on the conductor on opposite sides. Include ball valves and Cam-Lock male fittings on each nipple. Ensure threaded ball valves can be installed without running into the OD of the diverter head. Nipples are to be used as follows: ➢ Assist in washing out surface casing hanger on cement jobs ➢ Take returns to Vac trucks while cementing ➢ Provide access to annulus for top job through small diameter tubing 6. Build spud mud. Refer to the detailed MI-Swaco Mud Program(attached). SP28-NW3 Drilling Wellplan Page 6 of 39 07/29/15 /4 • ernno• us operathr WELL SP28-NW3 SURFACE SECTION Surface Formation Markers: (all depths Doyon 15: Schlumberger Plan P5) True Measured Formation Tops Depth, ft Vertical Comments Depth, ft SV-4 769 761 SV-3 1119 1104 SV-2 1394 1355 B/Permafrost 1859 1764 SV-1 2051 1928 Ugnu Top(UG4) 2451 2240 13-3/8" Csg 3383 2454 SCP UG-2 Coal Bed Marker 3444 2723 Lower Ugnu 13594 3234 Schrader Bluff Top 14533 3415 - 1 Sequence Top 14580 3424 N Top 14845 3471 ReCalc Intermediate Cement w/Actual N Bottom 14884 3478 N Sequence Base 15208 3522 OA Top 16296 3587 9-5/8" Csg 16410 3592 ICP OA-2 Top 16437 3593 5 1/2" Liner 25344 3582 Total Depth SP28-NW3 Drilling Wellplan Page 7 of 39 07/29/15 • • wok• us operating WELL SP28-NW3 Surface Close Approach Wells NOTE: It is the responsibility of the Directional Driller and the Drilling Supervisor to ensure that the directional plan is executed as planned,that the position of the well as it is drilled is monitored on an anti-collision diagram and that no tolerance line for close approach wells is crossed. Surface Mud Program: NOTE: Maintain Weight up Schedule as listed below to casing point API Fluid Density 6 RPM Chlorides Interval Depth PH (PPg) Reading Loss (mg/1) 110'— 1800' 8.8-9.2 20—24 <8 <2000 9.0—9.5 Surface: 1800'—C.P. 9.2—9.5 20—24 <6 <2000 9.0—9.5 Surface Logging/Formation Evaluation Program: Surface: MWD Directional LWD GR/Resistivity Surface Drill Pipe Pipe WT Grade Conn. Tool Tool Body Make Up Joint Body DP Tensile (ppJ) type Joint Joint ID(in) Torque Torsion Torsional capacity Capacity OD ID(in) (ft.lbs) al Yield Yield w/conn. (kips) (in) (ft lbs) (ft.lbs) (gal/ft) 5"DP 19.5 S-135 TT525 6.50 3.875 4.276 49,600 82,700 74,100 .731 712 5"HWDP 49.5 S-135 TT525 6.625 3.250 3.250 83,200 118,900 126,000 .43 990 Surface Drilling Surface Hole Notes: • The area around the conductor should be continuously monitored during drilling,circulating,and cementing operations. If broaching occurs,stop drilling immediately. Contact the AOGCC field inspector and the Drilling Superintendent and inform them of the broach. The Conductor Broach Procedure will then be implemented. • Efforts should be made to minimize high doglegs in surface hole. ESP equipment will be damaged running through high doglegs. Inform the Drilling Engineer of any doglegs over 6 degrees per hundred. • Prior to spud,a safety meeting will be held with the rig crews to discuss open hole drilling procedures. Suggested topics include: • Conductor broaching operations and contingencies • Well control procedures and rig evacuation procedures • Flow rates and hole cleaning • Ported float valves are required in all hole sections • Ensure lecithin is added to the mud system. SP28-NW3 Drilling Wellplan Page 8 of 39 07/29/15 Vtik eni us operr3CflfJ WELL SP28-NW3 Surface Hole Procedure: 1. Pick up and drift all DP,HWDP,and DC's for surface section to confirm free of debris. 2. PU BHA(Include GWD if MWD surveys are not clean initially)for directionally drilling to Surface Casing point with one BHA 3. Directionally drill surface hole: ➢ Drilling Parameters: ■ 650-800 GPM • Lower flow rates of 450-600 GPM will help avoid anti-collision boundaries by minimizing hole washout and optimize dog leg capability in the build section ■ RPM:40-80 RPM ➢ Avoid anti-collision boundaries ➢ Take MWD surveys as frequently as needed. Carefully review the anticipated close crossings with existing wellbores. Make sure that directional drillers are aware of all drilling close crossing issues,hardlines and no-go lines. If a no-go or hardline has been or will be crossed,stop drilling immediately and contact the Drilling Superintendent to discuss options. 4. Hole conditions will always determine final mud properties. ➢ Watch returns closely for signs of gas when near the base of the permafrost and circulate out all gas-cut mud before continuing to drill. • Due to expected gas hydrates,keep mud as cool as possible(cold lake water). • Control drill at 100 to 120 fph through any troublesome zone so the hole does not load-up with gas cut mud. • Check and report trip gas. • Have 2 ppb Lecithin on location prior to drilling below the permafrost to minimize the effects of hydrates on the mud if hydrates are encountered. ➢ Consider adding 0.5%Drilzone for screen blinding in shallow intervals right below the conductor. 5. Surface casing point: ➢ Landed in good shale found in this area between 2454' TVD ➢ Below the sand at the base of the Sagavanirktok Formation(SV-1). ➢ Inside the upper Ugnu(UG-4). ➢ Drill the footage necessary to leave the appropriate amount of rathole below the casing shoe. 6. Backream out of the hole at surface casing point: ➢ Circulate until shakers are clean(+/-3 to 5 bottoms up per K&M model)while backreaming one(1)stand for every bottoms up during the cleanup cycle. • 800 GPM or higher • 80 RPM or higher ➢ Backream to the HWDP • 800 GPM or higher ■ 80 RPM or higher • Pull 5-10 feet per minute • Decrease backreaming speed as torque and pump pressure dictate. SP28-NW3 Drilling Wellplan Page 9 of 39 07/29/15 1 us operating WELL SP28-NW3 • NOTE: once backreaming in the open hole has been started,do not stop backreaming until the HWDP. Do not attempt to pull out on elevators once backreaming has started. • Expect+/-100%increase in cuttings from 2400'-600'. • Lesson Learned from OP09-S1:While backreaming out of the hole in the transition from horizontal to vertical,have the shaker box sub-guns running or ready to run at the first sign of clay balling. Have the flow line jets hooked up and ready to activate to assist flowline cleaning. Pitwatchers should notify the rig floor at first clay show on the screen beds. • If shakers/mud return system become overloaded and flow rate is cut to handle the issue,then do not continue to Backream until the parameters are brought back to full backreaming rate ➢ Once the HWDP is reached,circulate until hole is clean(shakers clean) 7. Pull and lay down BHA. 8. Perform a dummy hanger run before running casing. SP28-NW3 Drilling Wellplan Page 10 of 39 07/29/15 e n n us operating [WELL SP28-NW3 Surface Casing Program: (all depths feet RKB) OD WT Grade Conn. Cplg OD ID(in) Drift(in) Collapse Burst Tensile Yield (in) (PPf) Type (in) (psi) (psi) (kips) 13-3/8 68 L-80 BTC 14.375 12.415 12.259 1950 3450 1069 Surface Casing Connection Make Up Torque(ft.lbs) OD WT Opt. (in) (PPOGrade Conn.Type Make Up Torque 13-3/8 68 L-80 BTC Triangle Surface Casing Casing Running Notes a. Surface casing will be landed on hanger and emergency casing slips will be the contingency plan. b. Rig up and utilize a Fill Up tool for the casing job. c. Break circulation before reaching the base of the permafrost if casing run indicates poor hole conditions. d. Any packing off while running casing,and especially while above the base permafrost,should be treated as a very serious problem if major returns are lost. Run 4"lines from side outlets on conductor to a Vac Truck to help reduce pack off problems and minimize chance of spill. It is preferable to pull casing out until circulation can be re-established rather than risk not getting cement to surface. Contact the Drilling Superintendent if the casing packs off high for discussion of the options. e. Have Vetco representative verify the correct casing hanger is on location prior to the point at which it is needed. f. Torque values for the BTC casing are determined at the rig by making up the connection to the make-up mark (base of triangle). Record torque values for the first 10 connections made up in this manner and average. This average will be used as the make up torque for the remainder of the string. 1. Inspect and drift all surface casing to 12.259". 2. Break circulation before reaching the base of the permafrost if casing run indicates poor hole conditions. 3. While RIH with the the Casing: ➢ obtain SO Weights every 10 joints )=- obtain PU Weights every 10 joints f SP28-NW3 Drilling Wellplan Page 11 of 39 07/29/15 ena us op&atiing WELL SP28-NW3 4. Run the surface casing as follows: Surface Casing Running Order 1 Float shoe Bakerlock 2 2 joints 13-3/8"68#L-80 BTC casing Bakerlock 3 Float Collar Bakerlock 4 13-3/8"68#L-80 BTC casing ** TAM BTC port collar+/-500 ft Only run if losses are expected 6 13-3/8"68#L-80 BTC casing to hanger 7 Vetco Gray 13-3/8"mandrel hanger 13-3/8"landing joint Slick landing joint if not 8 running the TAM port collar **If TAM port collar is run: • A landing joint,which has a connection that can be broken below the rotary table,will need to be run to allow for running the drill pipe inside the 13-3/8"without needing a false rotary table. Also,the drill pipe running tool needs to be on location and stood back in the derrick ready to run in case the TAM port collar needs to be opened to circulate cement to surface. • If decision to run is at the last minute,ensure the additional footage of the port collar plus handling pup will allow for sufficient rathole below the surface casing shoe. Surface Centralizers +/- 15 13-3/8"Tandem Rise Weatherford SP28-NW3 Drilling Wellplan Page 12 of 39 07/29/15 to,• • gni us operating WELL SP28-NW3 Surface Centralizer Placement il )11.111111111M.■( t 10 oa 13-3/8"x 16" Tandem Rise Centralizers Collar • 2 at 5'&8' above Float shoe on stop collars,using stop buttons or stop collars. • No centralization on collar of V joint. • 1 at 10'above Float Collar,using stop buttons or stop collars. • From 3rd joint through tail slurry(500'tail slurry),1 centralizer per joint run on collars. Do not allow centralizer to float between collars. • 2 on 13-3/8"casing collars,inside conductor @ TD so csg can be reciprocated. ) """"= ) 8' 5' , , SP28-NW3 Drilling Wellplan Page 13 of 39 07/29/15 eni us operating WELL SP28-NW3 Surface Cementing Program Section Casing Size Type of Fluid/Cmt Volume Properties Mudpush 11 100 bbls Density10.1 ppg Lead Slurry 436bb1s Density 10.7 ppg Surface 13-3/8" (ArcticSet Lite) Yield 2.77 ft3/sk Tail Slurry Density 12.5 ppg (DeepCRETE) 63bbls yield 1.57 ft3/sk Top of Tail @ 2,279'MD Surface Cementing Casing Cementing Notes a. Obtain and review the Test Report from the cementing lab on the job blend prior to pumping the cement. DO NOT pump cement if there are any doubts as to cement quality,quantities,pumping times,or thickening times. b. Use split landing joint if TAM port collar is utilized and needs to be opened by running tool on drill pipe. 1. After reaching bottom, rig up and circulate with casing on bottom at 5 bpm, if possible, without losing returns. Reduce mud viscosity prior to pumping cement if necessary. ➢ To help ensure good cement to surface after running the casing, and if practical for existing hole conditions, condition mud to YP < 20 lb/100ft2 prior to cementing the casing but after the casing is on bottom. Have adequate supply of cold lake water on hand to ensure the desired rheologies can be achieved. 2. Rig up to cement and pressure test cement lines. 3. Pump cement job per the attached Schlumberger cementing plan. Cement volumes are based on 35%excess below the Permafrost and 190%excess in the Permafrost. ➢ If necessary,verify that the TAM Tech has located the proper crossovers to his combo running tool ➢ If necessary,rack TAM running tool in derrick and ready to run ➢ Hook up or install a water inlet below the landing ring(to the 3"threaded nipples)and the mandrel hanger to add water to clabbered mud returns when necessary. ➢ Run 4"lines x-over from 3"side outlets to a vacuum truck. • Include a tee to allow for cement sampling 4. Report the number of bbls of cement returned to surface: ➢ Task one person to be in charge of monitoring for cement returns and volume of cement returns ➢ Recommend that a dye or small amount of celloflake be added to the wash or spacer to give an indication of top of cement. 5. Drop the bottom plug between the lead cement and the mud push. 6. Drop top plug after the tail slurry. 7. Pump displacement at 6 bpm maximum. 8. Drop circulation rate to 2 BPM for last 10 bbls of displacement for bumping plug. 9. Pump until the plug bumps and then pressure up to 500 psi above circulating pressure to ensure the plug has landed. If floats do not hold,maintain final circulating pressure on casing and shut in cement head for a minimum of 6 hours before rechecking. ➢ Do not over displace the cement(no more than'/2 the shoe joint volume). SP28-NW3 Drilling Wellplan Page 14 of 39 07/29/15 • em us operating • WELL SP28-NW3 ➢ Watch for signs of packing-off during pumping operations and closely monitor the cellar area for mud or cement returns around the conductor. ■ The pack off problem has occurred on some offset wells when the hanger by-pass area was restricted. ➢ In the event cement is not circulated to surface,pump the calculated volumes and prepare to open the TAM Port Collar(if applicable)for a secondary cement job. ➢ AOGCC and Drilling Superintendent must be contacted prior to beginning top job. Do not proceed with top job without AOGCC approval. 10. Drain and wash cement from riser. Nipple down riser and flush all lines. 11. Nipple up Vetco Gray Well Head,orienting the well head valves as indicated on the conductor markings. ➢ If there is any doubt about the proper orientation,call the Drilling Superintendent. ➢ Ensure that the seal between the casing hanger and well head is tested to 5,000 psi for 10 minutes. ➢ Measure the distance from the rig floor to the top flange of the well head and record on the IADC report and in WellView. Complete the Rig Elevation Record and place it in the electronic well folder. 12. Nipple up the 13-5/8"5M BOP stack and test per the AOGCC Permit to Drill(attached) ,b v� ➢ Test rams and choke manifold components to 3500 psi high/250 psi low ➢ Test annular preventer to 2500 psi high/250 psi low ➢ Do not test BOPE against casing. ➢ Notify AOGCC 24 hours prior to performing BOP test. • PERMIT TO DRILL requires BOP testing frequency every 14 days unless notified otherwise by AOGCC / SP28-NW3 Drilling Wellplan Page 15 of 39 07/29/15 VI'I em us operating WELL SP28-NW3 Pick Up Intermediate Drilling Assembly 1. Install wear bushing. Pick up: ➢ 12-1/4"bit • Rotary Steerable • PWD ■ GR/RES ➢ Flow rate of 900 GPM ➢ 120—140 RPM 2. RIH to top of float equipment and pressure test surface casing to 2500 psi for 30 min and record on chart. ➢ Plot Casing Pressure Test on LOT form on N drive. Verify that the test indicates a linear line and that there is no air entrained in the mud. Repeat Casing pressure test if needed. ➢ Note:All BHA trips thru the TAM port collar(if applicable)should be done slowly with slow rotation to avoid accidentally opening port collar. If set-down weight is noted,stop immediately,PU,resume slow rotation and try slacking off through port collar area. 3. Drill out the float collar&shoe. ➢ See Float Equipment and Plugs PDC Bit Drillout Recommendations Attachment 4. Drill 20'-50'of new hole using spud mud. 5. Displace hole to new LSND mud system. 6. Perform Leak Off Test as per AOGCC requirements following the attached LOT Procedure. ➢ PU into casing and perform LOT. ➢ If the pressure continues to rise past 13.0 ppg EMW,shut down and call it a FIT per the FIT Guidelines (attached). ➢ If LOT is unacceptable to drill ahead(less than 11.0 ppg EMW),contact Drilling Superintendent to discuss options. ➢ Plot on LOT form on N drive. SP28-NW3 Drilling Wellplan Page 16 of 39 07/29/15 sio, • 2nd us opera i WELL SP28-NW3 INTERMEDIATE SECTION Surface Formation Markers: (all depths Doyonl5: Schlumberger Plan (P5) True Measured Formation Tops Depth, ft Vertical Comments Depth, ft SV-4 769 761 SV-3 1119 1104 SV-2 1394 1355 B/Permafrost 1859 1764 SV-1 2051 1928 Ugnu Top(UG4) 2451 2240 13-3/8" Csg 3383 2454 SCP UG-2 Coal Bed Marker 3444 2723 Lower Ugnu 13594 3234 Schrader Bluff Top 14533 3415 N Sequence Top 14580 3424 N Top 14845 3471 ReCalc Intermediate Cement w/Actual N Bottom 14884 3478 N Sequence Base 15208 3522 OA Top 16296 3587 9-5/8" Csg 16410 3592 ICP OA-2 Top 16437 3593 5 1/2" Liner 25344 3582 Total Depth SP28-NW3 Drilling Wellplan Page 17 of39 07/29/15 irotit • • eni us operrafing WELL SP28-NW3 Intermediate Mud Program: NOTE: Weight up to at least a 9.4 ppg MW by the top of the"N" sand Interval Density PV 6 RPM API FL pH DrillSolidsMBT (ppg) Reading (mU3Omin) (/o) Intermediate: 9.2—9.4 12-18 12-18 <6.0 9-10 <6.0 <18 Intermediate Logging/Formation Evaluation Program: Intermediate: MWD—Directional/PWD(Pressure While Drilling) LWD—GR/Res Intermediate Drill Pipe Tool Joint Body DP WT Conn. Joint Tool Body Make Up Tensile Torsion Torsional capacity Pipe Grade Joint Torque Capacity (ppJ Type OD ID(in) al Yield Yield w/conn. (in) ID(in) (ft.lbs) (ft lbs) (II.lbs) (gal/ft) (kips) 5"DP 19.5 S-135 TT525 6.50 3.875 4.276 49,600 82,700 74,100 .731 712 5"HWDP 49.5 S-135 TT525 6.625 3.250 3.250 83,200 118,900 126,000 .43 990 Intermediate Section Notes: a. If the well is to be an ESP producer,a pump tangent must be placed in the intermediate hole section as per the planned directional profile. The pump tangent must be within 300' TVD from the top of the uppermost OA sand and at least 200' MD in length. b. Efforts should be made to minimize high doglegs above the pump tangent(if applicable). The ESP equipment will be damaged running through high dog legs(>6 degrees per hundred). c. Shallow test MWD tools. d. Monitor hole conditions carefully. Be alert for early signs of lost circulation and differential sticking. If any of these problems are observed immediately notify the Drilling Supervisor or Toolpusher(attempt to keep the pipe moving and circulation established). Ensure that all team members are communicating with each other on any observed drilling trends and that everyone understands the potential risks. e. Good drilling and tripping practices are vital for avoidance of differential sticking. Make every effort to keep the drill string moving whenever possible and avoid stopping with the BHA across the sand for any extended period of time. f. Keep shut down times to a minimum during connections. g. Swab/Surge: Make"easy on,easy off'slips a standard practice h. Control the ROP if necessary to maintain good hole cleaning i. Ensure the Top Drive Torque Limit is set below the lowest make up torque in the string. Do not run the risk of further make up to a connection while drilling. SP28-NW3 Drilling Wellplan Page 18 of 39 07/29/15 Witk • • epi us operating WELL SP28-NW3 Intermediate Drilling 1. Directionally Drill 12-1/4"hole ➢ Use the following Parameters: • Flow rate of 900 GPM • 120- 140 RPM 2. Casing Point:Land Intermediate casing at 16,410'MD into OA Sand Reservoir. 3. LOW ROP:Consult with Town as ROP drops to< 1-2 ft/hr for one(1)full hour. This usually occurs in the Lower Ugnu at high tangent angles(+80 degrees). Goal is to avoid excessive BHA and DP wear. Decision should be made to trip BHA out of the hole before excessive wear begins. 4. Backream at Intermediate Casing point: ➢ Circulate until shakers are clean(+/-5 to 7 bottoms up per K&M model)while backreaming one(1)stand for every bottoms up during the cleanup cycle. • 900 GPM • 120-140 RPM ➢ Backream into the surface casing shoe. • 900 GPM • 120 RPM • Slow backreaming speed when pulling into the surface casing shoe/rathole. Hold parameters steady at 900 GPM and 120 RPM. Large chunks of coal can be deposited in the 16"rathole near the shoe. • Lesson Learned from OP09-S 1:While backreaming out of the hole in the transition from horizontal to vertical,have the shaker box sub-guns running or ready to run at the first sign of clay balling. Have the flow line jets hooked up and ready to activate to assist flowline cleaning. Pitwatchers should notify the rig floor at first clay show on the screen beds. Check drilling nipple for overflow at BOP's. • If shakers/mud return system become overloaded and flow rate is cut to handle the issue,then do not continue to Backream until the parameters are brought back to full backreaming rate • Decrease backreaming speed as torque and pump pressure dictate • NOTE: once backreaming in the open hole has been started,do not stop backreaming until the surface casing shoe. Do not attempt to pull out on elevators once backreaming has started. ➢ Circulate until shakers are clean(+/-3 to 7 bottoms up per K&M model)in the surface casing shoe • 900 GPM • 120 RPM 5. Pull and lay down BHA. SP28-NW3 Drilling Wellplan Page 19 of 39 07/29/15 $.0kit -411 2n o us °peaking r WELL SP28-NW3 Intermediate Casing Program: OD WT Conn. Cplg OD Collapse Burst Tensile Yield (in) (ppb Grade Type (in) ID(in) Drift(in) (psi) (psi) (kips) Hydril **Special 9-5/8 40 L-80 563 10.625 8.835 Drift 3090 5750 916 8.75 Intermediate Connection Make Up Torque (ft.lbs) Min. Target Max. (i) (D p� Grade Conn. Type Torque,Make ft- Make Up Make Up Yield Torque lbs Torque Torque 9-5/8 40 L-80 H56311 10,800 13,000 N/A 75,000 **Special Drift casing to 8.75 Intermediate Casing Interval Notes: a. Ensure proper sized rams are installed and tested prior to running intermediate casing. b. Rig up and utilize a casing fill up tool for the casing job. Shoe Track: 1. Have a spare float shoe and collar made up with centralizers and on location ready to go ➢ Shoe joint misalignment has caused cross threading with Hydril 563 connection and requires make up by hand for first 10-15 joints • Make-up Shoe track(and first 10-15 joints)by hand using chain tongs until enough weight is in the slips to prevent cross threading • The shoe track joints should be Bakerlocked. • Inspect the float valves as the shoe track is picked up. • Run the shoe track into the well to test and confirm the floats are holding negative differential pressure. Connection Make Up: 1. Refer to the TenarisHydril"Running Manual General Guidelines"attachment for make up,pipe dope,etc....(Also available on Tenaris website) 2. Make up the first joint to the specified target torque and relax the tongs. ➢ Draw a longitudinal line across the pin and box and reapply the published target torque. ➢ If the drawn line does not move more than '/z"after the second torque application,continue running the rest of the string normally using the published target torque. ➢ If the drawn line moves more than %z"after the second torque application,this indicates that a portion of the torque was absorbed by other variables in the make-up system.If this occurs,follow these steps: • Increase the target torque by 15%and reapply the torque. • Draw a second line and apply the original,specified target torque. • If the second drawn line does not move more than'h",continue running the rest of the string normally using the 15%higher target torque. • If the second drawn line moves more than 1/4",recheck the alignment,dope application and tong function, then continue to repeat this procedure from above until the drawn line does not move more than '/z". SP28-NW3 Drilling Wellplan Page 20 of 39 07/29/15 rjr*• em us operating WELL SP28-NW3 ■ It is best practice to repeat this procedure in the event the tongs are changed out during the running of the pipe. 3. Ensure that the joint about to be made up is hanging along the same axis as the joint in the slips. Due to the fact that sometimes the rig is a few inches off center the slips and bell nipple may have to be adjusted. Casing Running Order 1 Float shoe—Davis-Lynch Model 501-DV-PVTS Baker Lock down jet float shoe(double valve)**** 2 2 joints 9-5/8"casing Baker-Lock Float Collar—Davis-Lynch Model Type 700 DVSB- 3 LAPN double-valve float collar w/anti-rotation Baker-Lock baffle**** 4 9-5/8"Casing 5 9-5/8"Casing 6 Vetco Gray 9-5/8"mandrel hanger 7 9-5/8"landing joint Slick landing joint for reciprocation purposes Centralizers +/-66 9-5/8"x 11-3/4"Rigid Hydroforms(Crimped) Volant 1. Inspect and drift intermediate casing(drift 8.75"). 2. Centralizers(See Diagram Below) 3. Pull wear bushing. Install 9-5/8"rams and test. Pick up and run casing. 4. Monitor running speeds to minimize surge and swab pressures while running in or picking up off slips. ➢ K&M Engineer will provide a trip speed schedule for each intermediate casing run based on individual well mud properties,hole angle,and depth. ➢ Circulate casing capacity at surface casing shoe,then break circulation every+/-2,000'MD and check flow through floats. Circulate bottoms up each time. ➢ Monitor trip tank while running in hole. Reduce speed if decrease or loss of flow is noted. 5. While running in open hole with Casing: ➢ obtain SO Weights every 10 joints 6. Once on bottom with the casing: ➢ obtain PU and SO Weight 7. Run the casing string on bottom. Establish circulation rate and pressure while pumping at least 1-2 bottoms up to condition hole. Reciprocate casing while circulating and cementing. 8. If needed,circulate and thin mud to properties slightly as outlined in CemCADE and Mud plan summary after running casing to bottom and prior to pumping cement. SP28-NW3 Drilling Wellplan Page 21 of 39 07/29/15 tifo*• S 2rin us open° Cnrnng WELL SP28-NW3 intermediate — Centralizer Placement 1111111111111 10, 9-5/8"x 11-314" Hvdroform Centralizers Collar Run 1 Ilvdrofornt: • 5'above Float shoe • No centralizer on next joint "_ � • 10'above Float Collar • From 4th joint to +1-1000 above the shot.. I centralizer crimped between collars • I centralizer crimped between collars from N sand oil bearing zone td-i- 500' above sand oil bearing zone SP28-NW3 Drilling Wellplan Page 22 of 39 07/29/15 eni us op&raI ng WELL SP28-NW3 Intermediate Cementing Program Section Casing Size Type of Fluid /Cmt Volume Properties Mudpush II 100 bbls Density 10.5 ppg Intermediate 9-5/8" DeepCrete Density 12.5 ppg Top of Lead @ 13,845'MD 173 bbls Yield 1.57 ft3/sk 15.8 ppg G Density 15.8 ppg Top of Tail @ 15,910'MD 48 bbls Yield 1.16 ft3/sk Intermediate Cementing Intermediate Cementing Notes: a. Obtain and review the Test Report from cementing lab on the job blend prior to pumping the cement. DO NOT pump cement if there are any doubts as to cement quality,quantities,pumping times,or thickening times. If need be,confer with Drilling Superintendent. b. Do not over displace the cement(no more than%2 the shoe joint volume). c. For injectors,a cement bond log is required. Prefer to run sonic LWD in production hole BHA and log intermediate casing on trip in hole to drill out intermediate shoe. 1. Perform Rig pump efficiency check and confirm+96%efficiency before pumping and displacing cement. 2. Ensure Schlumberger re-calculates cement volume based on"N"sand actual depth! ➢ Cement volume is based on 50%excess and at least 1000'of annular fill above top of the N sand(highest known hydrocarbon bearing zone). Refer to attached cement detail sheet for volumes. 3. Batch mix cement. Test cement lines and pump cement job as per the attached Schlumberger program. 4. Displace cement with rig pumps and LSND water-based drilling mud. ➢ Ensure that the cement unit and rig pumps are manifolded so there will be redundancy in case of any pump failure during displacement. ➢ Pump cement at 5 bpm and displace with 7.0 bpm if possible without losing returns. Slow rate to 3 bpm during last+/-30 bbls prior to bumping plug. 5. When the plug bumps,pressure the casing to 500 psi over the final displacement pressure and ensure that the string is holding pressure. Notify the Drilling Superintendent if the string will not hold pressure. Bleed off pressure and ensure the floats are holding. If the floats leak,pressure back up to final displacement pressure and shut in cementing head. 6. Land casing on mandrel hanger ➢ Maintain reciprocation as long as possible 7. Install Vetco 9-5/8"packoff assembly. 8. Pressure test packoff per Vetco Gray. ➢ Do not exceed 80%of intermediate casing collapse ➢ Record test on IADC report and in WellView SP28-NW3 Drilling Wellplan Page 23 of 39 07/29/15 • w us operating WELL SP28-NW3 9. Freeze protect 13-3/8"x 9-5/8"annulus to the surface casing shoe. ➢ Cement Consistency of 50 Bc(Bingham consistency)is not pumpable. 50 Bc is achieved roughly 4 hrs after mixing cement and starting downhole. ➢ Pressure limitations are as follows: 80%of surface burst or 80%of intermediate collapse,whichever is less. ■ 2472 PSI is 80%Intermediate casing collapse(9-5/8"40#L-80) ➢ Freeze protect the surface by intermediate annulus with diesel at 1-1/2 to 3 BPM. Pump enough diesel to flush and freeze protect to the surface casing shoe. 10. Install rams and test per the AOGCC Permit to Drill(attached) ➢ Test rams and choke manifold components to 3500 psi high/250 psi low N ➢ Test annular preventer to 2500 psi high/250 psi low ➢ Do not test BOPE against casing. ➢ Notify AOGCC 24 hours prior to performing BOP test. • PERMIT TO DRILL requires BOP testing frequency every 14 days unless notified otherwise by AOGCC 11. Install wear bushing. 12. Clean mud pits in preparation to receive OBM • Pits must be clean and free of all Barite SP28-NW3 Drilling Wellplan Page 24 of 39 07/29/15 rooki • eni us operrahng WELL SP28-NW3 Pick Up Production Drilling Assembly 1. PU the 8-3/4"bit and the BHA assembly as per the attached BHA diagram. ➢ 8-3/4"PDC ➢ Rotary Steerable ➢ Flow rate: 550 GPM ➢ 120—140 RPM 2. RIH to the float equipment. ➢ Pressure test the casing to 3000 psi for 30 min and record on chart(AOGCC required casing integrity test). ➢ Plot Casing Pressure Test on the Pressure LOT form in N drive Oil Based Mud Fluid Displacement 3. Displace casing to new Oil Based Reservoir Drilling Fluid ➢ Do not contaminate new OBM in rig pits ➢ Displace old water based fluid to trucks or exterior tanks for disposal 4. Drill out the float collar&shoe. ➢ See Float Equipment and Plugs PDC Bit Drillout Recommendations Attachment 5. Drill 20'-50'of new hole using the Oil Based Reservoir Drill-In fluid. 6. Perform Leak Off Test as per AOGCC requirements following the attached LOT Procedure. ➢ PU into casing and perform LOT. ➢ If the pressure continues to rise past 13.0 ppg EMW,shut down and call it a FIT per the FIT Guidelines (attached). ➢ If LOT is unacceptable to drill ahead(less than 12.0 ppg EMW),contact Drilling Superintendent to discuss options. ➢ Do not pump more than 1/2 bbl after leak off is determined. There is no need to pump more than 1/2 bbl into the leak off and extend the fracture. ➢ Plot on LOT form in N drive SP28-NW3 Drilling Wellplan Page 25 of 39 07/29/15 46101f* • • rill pm us operating WELL SP28-NW3 PRODUCTION SECTION Surface Formation Markers: (all depths Doyon 15: Schlumberger Plan (P5)) Measured True Formation Tops Depth, ft Vertical Comments Depth, ft SV-4 769 761 SV-3 1119 1104 SV-2 1394 1355 B/Permafrost 1859 1764 SV-1 2051 1928 Ugnu Top(UG4) 2451 2240 13-3/8" Csg 3383 2454 SCP UG-2 Coal Bed Marker 3444 2723 Lower Ugnu 13594 3234 Schrader Bluff Top 14533 3415 N Sequence Top 14580 3424 N Top 14845 3471 ReCalc Intermediate Cement w/Actual N Bottom 14884 3478 N Sequence Base 15208 3522 OA Top 16296 3587 9-5/8" Csg 16410 3592 ICP OA-2 Top 16437 3593 5 1/2" Liner 25344 3582 Total Depth SP28-NW3 Drilling Wellplan Page 26 of 39 07/29/15 I I NW us operating WELL SP28-NW3 Production Mud Program: FazePro Density HTHP FL Electrical Interval (PPg) VP (ml/30min) Oil:water Stability mlVolts Production 9.2 14-20 <5.0 65:35 >600 Production Logging/Formation Evaluation Program: Production: MWD Directional/PWD(Pressure While Drilling) LWD GR/Res/EcoScope/Peri SCOPE Production Drill Pipe Tool Joint Body DP Tool Make Up Tensile WT Conn. Joint Body Torsion Torsional capacity Pipe (ppb Grade type OD Joint ID(in) Torque al Yield Yield w/conn. Capacity (in) ID(in) (fzlbs) (ft lbs) (Albs) (gal/ft) (kips) 5"DP 19.5 S-135 TT525 6.50 3.875 4.276 49,600 82,700 74,100 .731 712 Production Section Notes: a. Monitor hole conditions carefully. Be alert for early signs of lost circulation and differential sticking. If any of these problems are observed immediately notify the Drilling Supervisor or Toolpusher(attempt to keep the pipe moving and circulation established). Ensure that all team members are communicating with each other on any observed drilling trends and that everyone understands the potential risks. b. Shallow test MWD tools. c. Good drilling and tripping practices are vital for avoidance of differential sticking. Make every effort to keep the drill string moving whenever possible and avoid stopping with the BHA across the sand for any extended period of time. d. Keep shut down times to a minimum during connections. When surveying in this hole section reciprocate the pipe slowly while the survey is transmitted uphole. Keep the pipe rotating whenever possible. e. Ensure the Top Drive Torque Limit is set below the lowest make up torque in the string. Do not run the risk of further make up to a connection while drilling. Openhole Sidetracking Practices: f. Lowside in a fast drilling interval where the wellbore is heading up and where the ABI's show a good build rate. g. Orient within 15 degrees either side of lowside and trough with high rotary RPM's while reciprocating from the kickoff point back to the first stabilizer. Trough for approximately 30 minutes. h. Time drill at 4 to 6 feet per hour with high flow rates and rotary RPM's for the first 5 feet. Gradually increase the penetration rate as the openhole sidetrack is achieved. i. If any openhole sidetracks are drilled,confer with Drilling Supt.and consider tripping without circulating or without rotating past the sidetrack point. SP28-NW3 Drilling Wellplan Page 27 of 39 07/29/15 us operratt ng WELL SP28-NW3 Production Drilling Directionally drill the 8-3/4"hole to TD. ➢ Geosteering will be required to remain in the target boundary 100%of the time ➢ Maintain sufficient flow rate with maximum pipe rotation as needed to bring mud/well properties in line. ➢ Maintain proper Calcium Carbonate concentration per MI mud plan. • Ensure Centrifuges are operating effectively to remove fine drill solids 2. Backream at TD: ➢ At TD circulate 50%of calculated TAD cleanup cycle pulling 1 stand per bottoms up. Once the first 50% cleanup cycle is completed circulate the remaining 50%of the calculated cleanup cycle pulling 2 stands per bottoms up. Decrease backreaming speed as torque and pump pressure dictate. • 550 GPM • 120-140 RPM ➢ Backream into the intermediate casing shoe. • 550 GPM • 120-140 RPM • Slow backreaming speed when pulling BHA into the Intermediate casing shoe/rathole. Hold parameters steady at 550 GPM and 120 RPM. • Decrease backreaming speed as torque and pump pressure dictate • NOTE: once backreaming in the open hole has been started,do not stop backreaming. Do not attempt to pull out on elevators once backreaming has started. 3. Drop rabbit down drill string once bit is above the intermediate shoe:the SLM of landing string portion of the tapered DP • Drift OD dependent on Completion • COMPLETION DP RABBIT SIZE: 2-3/8"OD • All drifting tools will be accounted for and held in one place at all times. 4. Continue backreaminz until depth at which it is possible to pull out on elevators at>9.1 swab EMW at 2.5 min/stand • 550 GPM • 120-140 RPM • Determine depth at which swab can be kept>9.1 EMW at 2.5 min/stand as per K&M TAD Model. 5. Circulate until shakers are clean as per K&M. • 550 GPM • 120-140 RPM 6. Slug DP and trip out of hole on elevators. SP28-NW3 Drilling Wellplan Page 28 of 39 07/29/15 Iroiik • • em1 us operating WELL SP28-NW3 ➢ Utilize K&M's swab model to control trip speed and avoid swabbing the open hole below 9.1 ppg EMW. 7. Lay down BHA ➢ When out of hole,down load the recorded tool data and send to the Geologist in town Production Liner Completion DP RABBIT SIZE Will BE: 2-3/8" OD Production Liner OD Conn. Cplg OD Collapse Burst Tensile Yield (in) WT(ppj) Grade Type (in) ID(in) Drift(in) (psi) (psi) (laps) 5-1/2 15.5 L-80 H521il 5.713 4.950 4.825 4990 7000 242 Production Liner Connection Make Up Torque (ft-lbs) Min. Target Max. OD WT Grade Conn. Type Make Up Make Up Make Up Yield (in) (ppf) Torque, ft- Torque Torque Torque lbs 5-1/2 15.5 L-80 Hydril 521 4600 8100 N/A 24,000 * See attached TenarisHydril Guidelines for make-up torque recommendations Production Liner Centralization From To Quantity/Joint Fixed/Floating Type Shoe Liner 1/joint Fixed 5-1/2"x 7" top -Mid joint -Crimped on -Hydroform,Volant(Crimp on) Liner Running Procedure Notes: • Ensure proper crossover from DP to slotted liner is on the rig floor in case of a well control situation. • Liner top should be placed a minimum of 200 ft above the intermediate casing shoe. • Ensure accurate torque and drag data is gathered. Record pick up and slack off weights every stand and free rotating torque every five stands. Data gathered will assist in future liner running operations throughout the project. • Perform visual inspection,measure and caliper all components prior to running any assembly in the hole. Ensure accurate dimensional data is recorded for all equipment run in the well and recorded in WellView. • Ensure all equipment has been hydraulically and operationally tested. Also ensure all equipment to be run is dimensionally compatible with all other equipment. • Review all setting operations and shear pressures with Baker Oil Tools service hand. • Ensure that all workstring components have been rabbited as ball will be dropped to actuate downhole tools.Rabbit DP on last trip out of prior to running liner. • Batty openhole sidetracks have been drilled,monitor sidetrack depths during run in and ensure shoe enters the correct hole. SP28-NW3 Drilling Wellplan Page 29 of 39 07/29/15 rlif, • em us operating nng WELL SP28-NW3 • DO NOT run E-CD subs on drill pipe while running liner string. • Torque ratings for string components: String Components Yield Torque(ft-lb) 5" 19.5#TT525 Drill Pipe 74,100 HRD Running Tool 40,000 7"29#Hydril 563 39,000 5-1/2" 15.5#Hydril 521 24,000 • Shear pressures for liner hanger assembly: Item Description Shear Value Shear Range HRD Running Tool,7" Nominal- 3192 psi 15%+ 3671 psi 6795 mch rel,3 pins 15%- 2713 psi Pusher Tool Activation Nominal- 1986 psi 15%+ 2284 psi 15%- 1688 psi Pusher Tool Neutrlz. Nominal- 3588 psi 15%+ 4126 psi 15%- 3050 psi Ball Seat SOLID xxxxxMake-up torque for liner hanger sub-assembly,including running tool connections,should be torqued to 14,000 ft-lbs prior to deliver to rig. Procedure: 1. Hold Pre job safety meeting to ensure all parties understand operation 2. PU the Liner Assembly and Running/Inner String as outlined above. 3. RIH with Liner Assembly. Record PU and SO weights as required. 4. Pick up liner hanger assembly and make up to proper torque. Fill Liner Tieback Sleeve with"pal mix" and ensure mixture is thin enough to travel past the HRD tool and down to the packoff. Wait 30 minutes for mixture to set up. 5. Trip in hole one stand and circulate 5 bbls to ensure all flow paths are free. Record ROTATE,PU and SO of liner assembly. 6. RIH in hole to casing shoe with DP. RIH with Liner Assembly as hole conditions allow,but do not exceed running speed of one stand per minute. Break circulation and fill DP as necessary. 7. Monitor mud flow while running in open hole and slow running speed if necessary. Circulate minimum of one DP volume and record ROTATE,PU and SO weights. 8. Record PU, SO, and Rotating torque in open hole every 500' to ensure friction factors are sufficient to run the liner to bottom successfully. If friction trend indicates liner will not go to bottom then call Drilling Supt.immediately. 9. Rotating liner 20-60 RPM will be necessary to run to bottom. 10. Continue RIH with Liner Assembly to proper setting depth. Liner should be spaced out to locate the liner top approximately 200 feet above 9-5/8"casing shoe. 11. Trip slightly deeper than desired liner top location with liner top. Last motion of the liner should be up to ensure it is set in tension. Ensure Liner Hanger assembly does not exit 9-5/8"casing shoe. 12. Prior to setting the hanger&packer,double check all pipe tallies and record amount of drill pipe on location. SP28-NW3 Drilling Wellplan Page 30 of 39 07/29/15 en i us operating WELL SP28-NW3 13. Rig up to pump down workstring with rig pumps. Pressure test lines. Bleed off test pressure. 14. Drop setting ball down the workstring and pump slowly(1-2 bpm). Slow pump before the ball seats. Do not allow ball to slam into ball seat. 15. Pressure up to 3000 psi and hold for 5-15 minutes to set SLZXP hanger packer. Continue pressuring up in 500 psi increments holding for 5 minutes each up to 4000 psi. 16. Packer can now be pressure tested. Bleed DP pressure to zero, close annular preventer and test annulus to 1,500 psi for 10 minutes and chart. 17. Bleed off pressure and pickup to verify that the IIRD running tool has released. If packer did not test, rotating dog sub can be used to set packer. If running tool cannot be hydraulically released, 6,795 ft-lbs of left hand torque can mechanically release the tool. 18. Once running tool is free and packer is tested,Displace mud from liner top to surface with 9.0 ppg KCI brine per MI recommended program. 19. POOH and LD and inspect the liner running tools. SP28-NW3 Drilling Wellplan Page 31 of 39 07/29/15 m us op&rrathr g WELL SP28-NW3 ATTACHMENTS 1. Recommended Drilling Practices 2. Health,Safety,and Environment 3. Safety Meeting Topics 4. Well Shut In Procedure While Running Tubing 5. Conductor Broaching Contingency Plan 6. Port Collar Decision Tree SP28-NW3 Drilling Wellplan Page 32 of 39 07/29/15 S X111 us operating WELL SP28-NW3 Recommended Drilling Practices Hole Cleaning With a deviated well path and potential for losses,hole cleaning will require special practices. Pipe rotation is critical for effective hole cleaning. The maximum string RPM,as determined by the BHA, is specified for each hole section in the detailed procedures. The shakers should be monitored as an indicator of adequate circulating time. If circulation is of long duration,then pipe movement to prevent casing wear is critical and a stand should be laid down occasionally to prevent excess hole erosion over the length of pipe reciprocation. In addition the following practices should be employed at all times: a) Use all available solids control equipment to keep mud as clean as possible. b) Emphasize proper hole cleaning after slides by rotating at maximum allowable RPM c) As the hole angle increases,hole cleaning practices must be altered. Maximum pipe rotating speeds along with maximum achievable flow rates will increase hole cleaning efficiencies. Circulating times prior to trips should be increased accordingly to account for longer times required to remove cuttings from higher angle wells. d) Use good connection practices while drilling. After reaching the bottom of a stand,allow a small amount of circulating time to allow cuttings to get above the BHA prior to picking up off bottom. Be sure to pick up slowly to prevent packing off the cuttings bed around the top of the drill collars. Slower Trip/Connection Speeds High POOH and RIH speeds can aggravate fragile shales/formations due to the pressure variations between surge/swab. PWD data shows that excessive tripping and reaming speeds can exert pressure spikes in excess of 2 ppg equivalent. Effective ROP Strive to find the maximum effective rate of penetration.That is,the maximum rate at which a clean hole can be produced. While on bottom ROPs in excess of 400 fph may be possible,but such ROPs may load a high angle hole with cuttings that are not being removed fast enough. Using torque and drag trends,ECD and the shakers,establish a base line clean hole ROP,and then try to improve it by altering the hole cleaning practices. Slower Initial Pump Rates PWD data has shown that the most significant period for increased ECD occurs when the pumps are brought on at drilling rate while washing a connection to bottom. The study also concluded the least damaging procedure is if pump rates are held at 40%or less of drilling rate while reaming connections. SP28-NW3 Drilling Wellplan Page 33 of 39 07/29/15 • era us operating WELL SP28-NW3 Health, Safety & Environment The following are part of the mitigation&contingency measures to be put in place in order to complete this project while helping to meet our HS&E goals. It is the Drilling Supervisor's responsibility that these measures are implemented and communicated to the relevant parties on location. Good communication when drilling is essential for increasing the safety of personnel and equipment. H2S Contingency Measures Assume all locations have the potential for H2S. 1. The AOGCC will be notified within 24 hours if H2S is encountered in excess of 20 ppm during drilling operations. 2. The rig will have fully functioning automatic H2S detection equipment meeting the requirements of 20 AAC 25.066. Manual detectors in accordance with 20 AAC 25.065 will also be maintained on location. 3. Self-contained Breathing Apparatus for all rig personnel will be maintained on location. 4. All personnel engaged in the drilling operation will be trained in H2S emergency procedures and the use of proper personal protective equipment. 5. A standard H2S contingency plan will be posted at the rig. All rig personnel should read and familiarize themselves with this document and copies should be posted in the rig floor doghouse and in the camp on location. 6. H2S treating material for the drilling mud system will be available on location in the event that any H2S is encountered. It is expected that the rig and personnel will have the equipment and training to identify and contain a H2S emergency situation. If it becomes necessary to notify the AOGCC of an H,S encounter,drilling will be suspended and will resume only after the development of detailed remedial and contingency procedures,full compliance with 20 AAC 25.065 and the applicable referenced sections of API RP49 and approval of the AOGCC. Lessons Learned Documentation of lessons learned has been proven to reduce downtime and increase efficiency of rig operations. It is expected that planning meetings,daily operations meetings and pre-tour meetings will be held on a regular and consistent basis and that the records of those meetings will be placed on the N drive in the appropriate folder for this well. SP28-NW3 Drilling Wellplan Page 34 of 39 07/29/15 em us operating WELL SP28-NW3 Safety Meeting Topics Move In, Rig Up ➢ Prior to spud,a safety meeting should be held with the rig crews to discuss open hole drilling procedures. - Subsidence around wellheads-use of buddy system, - Conductor broaching operations and contingencies, - Shallow gas hydrate drilling practices, - Proper tripping practices and hole fill calculations with various sizes of pipe and tubing, - Well control procedures, - Flow rates and hole cleaning, and - Diverter operation and crew responsibilities. ➢ A'Diverting Shallow Gas'drill should be held with rig crews prior to spud,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. ➢ An'Accumulator'drill should be held with rig crews prior to spud. Document drill and record on morning report. ➢ Shut-in drills should be held on a regularly scheduled basis. A suggested minimum is once per day on alternating tours. Document and record on morning report. ➢ Check trip tank for leaks and confirm gauges are calibrated. Complete trip sheets and submit to the Drilling Supervisor after each trip. ➢ Perform and document all drills. ➢ Designate crew member to control access at the pad entrance in case of diverter operation. Surface ➢ A'Stripping'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. ➢ A'Well Kill'drill should be held with rig crews prior to drill out,unless each crew on tour has completed this drill within the past 3 months. Document drill and record on morning report. ➢ A well kill sheet shall be posted in the doghouse and updated each tour. Intermediate ➢ Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. ➢ Hole cleaning best practices,flow rates. ➢ Stuck pipe,Lost circulation. ➢ Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. Production ➢ Prior to picking up the BHA a safety meeting should be held with the rig crews to discuss production hole risks and open hole drilling procedures. ➢ Potential formation pressures and mud weight,Well control procedures. ➢ Hole cleaning best practices,flow rates. ➢ Stuck pipe,Lost circulation. SP28-NW3 Drilling Wellplan Page 35 of 39 07/29/15 • eni us ©perrfing WELL SP28-NW3 ➢ Proper tripping practices and hole fill calculations with various sizes of pipe and tubing. Completion ➢ Operation of the control line spooler. ➢ Pinch points associated with tongs and slips. ➢ Proper tripping practices and hole fill calculations with tubing and control line. ➢ Well control practices while running production tubing with control line. ➢ Pressure testing and minimizing personnel exposure to pressurized lines. SP28-NW3 Drilling Wellplan Page 36 of 39 07/29/15 • 1# us ope atting WELL SP28-NW3 Well Shut In Procedure While Running Production Tubing If well is suspected to be flowing: 1. Install TIW valve and pull back to the first banding point below the BOP stack. 2. Shut off air to control line spool and bleed off line pressure while checking well for flow. 3. If well is confirmed to be flowing,cut control line with bolt cutters directly above a banding point. 4. Slack off until full joint of pipe with no control line attached is spaced out across BOP stack. 5. Close annular and monitor pressure. If well is coming in rapidly and time is not permitted to complete above operations: 1. Install TIW and close annular around pipe and control line. 2. Shut off air to control line spool and bleed off line pressure while picking up a joint of drill pipe and making it up to TIW and top drive. 3. Close IBOP on top drive and open TIW valve. 4. Cut control line and strip the joint of drill pipe across stack for ram closure if needed. 5. If annular does not seal off around tubing and control line and the joint of drill pipe cannot be safely picked up, close blind/shear rams on production tubing. Notes: • Specify location of bolt cutters required to cut control line. • Need to have access to a joint of drill pipe and the appropriately sized elevators at all times. SP28-NW3 Drilling Wellplan Page 37 of 39 07/29/15 Iiikt • • us opt rreonc WELL SP28-NW3 Conductor Broach — Contingency Cementing Plan In the event of a broach to surface of drilling fluids during the drilling of the surface interval,the following contingency plan is recommended to remediate the situation. Conductor Hole Diameter Conductor Casing Size 20" Conductor Setting Depth +/- 120'MD DP/Conductor Annular Volume 5"DP x 18.25"ID: (36 bbls) Conductor Pipe Volume 39 bbls 16"Open Hole Capacity 0.2487 bbls/ft 1. Upon establishing that a broach of the conductor casing has occurred,POOH and stand back BHA. 2. RIH with open-ended drill pipe to 20'below the base of the conductor pipe. 3. Establish circulation with mud at normal drilling rate. Begin circulating and establish rate of flow through broach with drilling fluid. 4. Circulate up to 120 bbls of water or until water returns are seen from the broach. 5. RIH to 200'below the base of the conductor. If mud viscosity is<300sec/qt., spot a 150'pill of 150K cp polymer (Biozan)to 50'below the conductor. POOH to 20' inside the conductor. 6. Mix and displace+/- 80 bbls of Artic Set 1 cement at 15.8 ppg. Cement may U-tube with no ability to obtain squeeze. Do not over displace DP. Monitor and gauge all returns. 7. POOH and WOC for 8 hours. 8. PU 16"bit and BHA and RIH to clean out cement to 40' below conductor. Establish normal circulating rate and evaluate broaching. If no broaching is seen,continue with planned operations. If additional broaching occurs, repeat steps 6,7 and 8. SP28-NW3 Drilling Wellplan Page 38 of 39 07/29/15 i • 2nA operahng WELL SP28-NW3 TAM PORT COLLAR Utilization Decision Tree TAM Port Collar Utilization Decision Tree Begin Primary One Stage Cement Job No Cement _ ement ta`° to Surface Surface Pr— Drilling Foreman and Nipple Up and Engineer determine the x Test BOP's Top of Cement • • Top of Top of Continue with Cement Cement above Port below Port Completion Collar Collar (1000'TVD) / (1000'TVD) • X Indicators of Cement Top Perform Top Job as per ► Open Port Col, 1. Observation of Tracers in Spacer ahead of lead cement If To Job is ineffective or N P requirements of P using drillpip s AOGCC unacceptable to AOGCC ? ; 2. CalculatedDisplacement 3. Displacement Pressures during Primary Cement Job 4. Other indications that cement is near surface • Nipple Up and Circulate Cern,' Test BOP's to Surface an,,, ;close Port Collar' VContinue with • Nipple Up and Completion Test BOP'S Continue with Completion SP28-NW3 Drilling Wellplan Page 39 of 39 07/29/15 e • Attachment 2 Directional Plan • • %lilt Schlumberger en i SP28-NW3(P5)op4 Proposal Geodetic Report (Non-Def Plan) Report Date: May 01,2015-03:14 PM Survey:DLS Computation: Minimum Curvature/Ludnski Client: Eni Petroleum Vertical Section Azimuth: 294.033°(True North) Field: Nikaitchuq //�� �n Vertical Section Origin: 0.0130 ft,0000 R Spy TVD Reference Datum: ry Table Well: Structure:Slot: SP28-NW3n ���0A/l.an S1ba Ground ference Elevation: 3700ft above MSL 6 above MSL Borehole: SP28-NW3F410 ���\r\ll��// CC// API#: 50629000000 Magnetic Declination: 18.532° Survey Name: SP28-I4 3(P5)op4 Total Gravity Field Strength: 1002.0156mgn(9.80665 Based) Survey Date: May 01,2015 Gravity Model: DOD Tort I AHD:DDI I ERD Ratio: 183.558°123509.8800/7.487 18.509 Total Magnetic Field Strength: 57562202 nT Coordinate Reference System: NAD27 Alaska State Plane,Zone 04,US Feet Magnetic Dip Angle: 81.060° .Location Let:Long: N70°3727.75728",W 149°5420.98248" Declination Date: November 20,2015 Location Grid WE YIX: N 6053621.010RUS,E 511481670805 Magnetic Declination Model: BGGM 2014 CRS Grid Convergence Angle: 00888° North Reference: True North Grid Scale Factor: 0.99990015 Grid Convergence Used: 00000° Version/Patch: 28.5720 Total Corr Mag North->True North: 18.5319° Local Cooed Referenced To: Well Head 6) Comments MD KI MITI True TVDSS ND VSEC NS EW TF DLS Directional Exclusion ZoneExclusion Zone Angle Easeng Northing (6) r) r) (6) (61 (6) (8) (f9 m rime) Difficulty Index Alert r1 (71115) ((m15) RTE 0.00 0.00 297,00 -54.10 0.00 000 0.00 0.00 297M N/A 000 894 51148167 6053621.01 100.00 0.00 297.00 4590 100.00 0.00 0.00 0.00 297M 0.00 0,00 8.94 571481.67 6053621.01 200.00 0.00 29700 14590 200.00 0.00 0,00 0.00 297M 0.00 0.00 894 51148167 605362101 KOP Cry 1/100 300,00 0.00 297.00 245.90 300.00 000 0.00 0.00 297M 0.00 0.00' 8.94 571481.67 6053621.01 Cry 2J100 400.00 1.00 297.00 345.89 399.99 087 0.40 -0.78 297M 1.00 0.00 8.85 511480.89 6053621.40 Cry3/100 500.00 3.00 297.00 44583 499.93 4.36 1.98 -3.89 297M 2.00 1.12 9.00 51147778 6053622;98 600.00 5.75 297.00 54553 599.63 77.97 5.44 -10.68 HS 2.75 7.84 9.88 511470.98 6053626.44 700.00 8.50 297.00 644,75 698.85 24.36 11.07 -21.73 HS 2.75 2.32 11.37 517459,92 6053632.05 SV-4 76035 10.24 297.00 707.25 761.35 3466 15.76 -30.92 HS 2.75 2.55 12.53 51145072 6053636.72 800.00 11.25 297.00 743.26 797.36 41.48 18.88 -37.01 HS 2.75 2.67 1326 511444,63 6053639.81 900.00 1400 297.00 .840.83 894.93 63.31 28,78 56.49 HS 2.75 2.95 • 75.41 511425.15 6053649.70 1000.00 16.75 297.00 937.24 991.34 89.79 40.82 -80.11 HS 2.75 3.18 17.72 51140151 6053661.70 7700.00 19.50 297.00 1032.27 1088.37 120.85 54,94 -107.82 HS 2.75 3,38 20.14 511373.77 6053675.78 SV-3 1119.13 20.03 297.00 1050.27 1104.37 127.31 57.87 -113,59 HS 2.75 3.41 20.62 511368.01 6053678.70 1200.00 22.25 297.00 1125.70 1179.80 156.43 71.11 -139.57 HS 2.75 3.55 22.64 571342.00 6053691.90 1300.00 25.00 297.00 1217,31 1271.41 196.45 89.31 -175.27 HS 2.75 3.70 25.18 57130628 6053710.04 Cm,0.5/100 139222 2754 297.00 1300.00 1354.10 23721 107.83 -211.64 15L 2.75 3.83 27.56 511269.89 6053728.51 SV-2 1393.66 27.54 29700 1301.27 1355.37 237.87 108.14 -212.23 151. 0.50 3.83 27.57 511269.30 6053728.81 1400.00 27.57 296.98 1306.89 1360.99 240.80 10947 -214.84 7498L 0.50 3.84 27.80 577286.68 6053730,13 1510.00 28.06 296.70 139534 1449.44 287.41 130.53 -256.48 7474E 0.50 3.92 28.10 51122502 6053751.13 1600.00 28,54 296,44 148339 1537.49 334.77 151.74 -298.88 74.5L 0.50 4.00 28.60 571182.59 6053772.27 1700.00 29.03 296.18 1571.03 1825.13 382.88 173.08 -342.04 1428L 0.50 4.07 29.09 577139.40 6053793.54 1800.00 29.51 295.93 1658.27 1712,37 431.74 194.55 -385.96 1406L 0.50 4.13 29.59 511095.45 6053814.94 Bas Penn 1859.53 29.80 295.78 1710.00 1784,10 461.17 207.39 41247 13.93E 0.50 4.16 29.89 511068.92 8053827.74 7900.00 30.00 295.69 1745.08 1799.18 481.34 216.15 -430.64 1385L 0.50 4.18 30.09 511050.74 6053836.47 Cry 3/100 7963.51 30.30 295.54 1800.00 1854.10 513.22 229.94 459.40 18L 0.50 422 30.41 511021.96 6053850.22 2000.00 31.35 29488 183134 1885.44 531.92 237.90 476.32 7744E 3.00 425 3150 511005.03 6053858.15 SV-1 2050,79 32.80 294.04 1874.37 1928.47 558.88 249.07 -50087 16.73E 3.00 4.29 33.03 510980.47 6053869.28 2700.00 34,22 293.29 1915.40 1969.50 586.05 259.97 -525.75 16.1L 3.00 4,33 34.50 510955.57 6053880.14 2200.00 37.17 291.91 1996.64 2050,74 644.33 282.35 579.58 7498L 3.00 4.41 37.50 570901.71 6053902.43 2300.00 4001 290.70 2074.83 2128.93 706.58 30497 537.66 1403L 3.00 449 40.50 570843.61 6053924.96 Cry 3.25/100 2363.51 41.88 290.01 2122.80 2176.90 748.11 31944 -676.67 106 3.00 4.54 42.41 510804,57 6053939.37 2400.00 43.03 290.31 2149.72 2203.82 772.88 32793 -699.79 9,78R 3.25 456 43.50 570781.44 605394763 Ugnu Top(UG4) 2451.01 44.87 29071 2186.51 2240.61 80795 340.32 -73289 9496 3.25 4.80 4503 51074833 6053960.16 2500.00 4624 291.08 222087 227497 842,81 35277 -765.50 9238 3.25 4,64 48.51 510715.70 6053972.56 280000 49.45 291.76 2287.98 2342.08 916.86 37985 -834.50 8776 3.25 4.71 49.54 570846.67 6053999.53 2700.00 52.66 292.39 2350,83 240493 994.58 40908 906.56 8386 3.25 4.78 52.59 570574.57 6054028.65 13-3/8'Csg 2703.67 5535 29287 2400.00 2454.10 062.25 435.13 -98904 8.IR 3.25 4.83 55.18 51051205 605405459 280000 55.88 29296 240922 2463.32 075.72 440.38 -981.45 6056 3.25 4.84 55.86 510499.64 6054059.82 200.00 59.10 293.49 246296 251706 160.03 473.63 -1058.94 7.788 3,25 4.90 58.74 570422.11 6054092.95 3050.00 6232 293.98 2511.88 2565.98 247.23 50873 -1138.76 7.528 3.25 496 61.84 51034224 605412793 3100.00 65.54 29445 2555.82 260992 337.04 545.58 -1220.87 7.310 3.25 5.02 84.94 510280.28 6054169.64 Cry 375/100 316351 87.59 29473 2581.08 2635.18 395.31 569.83 -1273.85 3828L 3.25 5.06 66.91 51020727 6054188.81 320000 68.67 29382 2594.67 264877 429.77 583.75 -1304.52 3792L 3.75 5,08 68.12 51017638 6054202.68 330000 7164 29140 2628.62 268272 523.18 619.89 -1391.34' 3709L 3.75 5.74 71.43 51008951 6054238.68 340000 74.65 28905 2657.62 271172 618.68 652.96 -1481.13 36.47 L 3.75 5.20 74.76 50999968 6054271.60 UG-2 Goal Bed 3444.11 75.98 28804 2668.80 2722.90 1661.13 666.53 -1521.59 36.16L 3.75 5.22 78.23 509959.21 6054285.11 Marker 3500.00 77.68 28678 2681,53 2735.63 1715.18 682.80 -1573.51 3587L 3.75 5.25 7510 50990727 6054301.31 3600.00 80.72 28455 2700.27 2754.37 1812.34 709.31 -1668.07 3545L 3.75 5.30 8195 50981267 6054327.66 3700.00 83.76 28236 2713.75 2767.85 1909.73 732.36 -1764.42 3.15L 3.75 5.36 84.81 50971629 e09ee60.56 3800.00 86.85 28020 2721.91 2778,01 2006.92 751.85 -1862.75 344.98E 3.75 5.41 88.18 50961855 605436990 End Cry 3837.30 88.00 279.40 2723.59 277769 2043.04 758.19 -1898.86 HS 3.75 5.42 8944 50958183 6054378.18 3900.00 88.00 279.40 2725.78 2779.88 2103,67 788.43 -196068 HS 0.00 5.44 8944 509520.00 6054386.32 400050 88.00 279.40 2729.27 2783.37 2200,36 784.75 -205928 HS 0.00 5.47 89.44 509421.38 605440249 4100.00 88.00 279.40 2732.78 278686 2297.06 801.07 -2157.88 HS 0.00 5.50 8944 509322.77 6054418.66 4200.00 88,00 279.40 2736.25 2790.35 239376 81740 -225608 HS 0.00 5.53 8944 509224.16 605443483 430000 88.00 279.40 2739.74 2793.84 2490.48 833.72 -235507 05 0.00 5.56 8944 509125.55 605445099 440000 88.00 279.40 2743.23 2797.33 2587.15 850.04 -2453.67 HS 0.00 5.59 89.44 509026.94 6054467.16 450000 88.00 279.40 2746.72 2800.82 2683.85 866.36 -255227 HS 0.00 5.61 8944 508928.32 6054483.33 4800.00 88.00 27940 275021 280431 2780.55 88269 -2650.86 65 0.00 5.64 8944 50882971 605449950 4700.00 88.00 27940 2753.70 2807.80 287724 899.01 -274946 HS 0.00 5.66 6944 508731.10 605451567 4800.00 8800 279,40 2757.19 2811.29 2973.94 91533 -284806 HS 0.00 5.68 8944 50863249 605453183 4900.00 8800 27940 2780.68 2874.78 3070.64 931.66 -2996.66 HS 0.00 5.71 8944 508533.87 805454800 5000.00 8800 279,40 2764.17 2818.27 3167.34 997.98 -304525 HS 0.00 5.73 89.44 50843526 6054564.17 5100.00 88.00 27940 2767,66 2821.76 3264.03 964.30 -3743.85 HS 0.00 5.75 8944 50833865 6054580.34 5200.00 88,00 27940 2771.15 2825.25 3360.73 980.62 -3242.45 HS 0.00 5.77 8944 508238.04 605459651 5300.00 8800 27940 2774.64 2828.74 3457.43 996.95 -3341.04 HS 0.00 5.79 8944 508139.43 605461268 5400.00 88.00 279.40 2778.13 283223 3554.13 013.27 -3439.64 HS 0.00 5.81 8944 508040.81 6054828.84 5500.00 88.00 279.40 2781,62 2835.72 3650.82 02959 -353824 HS 0.00 5.83 8944 50794220 6054645.01 5600.00 88.00 279.40 2785.11 2839.21 3747.52 045.91 -3636.84 HS 0.00 5.85 89.44 507843.59 8054661.18 5700.00 88.00 279.40 278860 284270 3844.22 06224 3735.43 HS 000 5.87 8944 50774498 6054677.35 5800.00 88.00 279.40 2792.09 2046.19 3940.91 078.56 3834.03 HS 0.00 5.88 8944 507646.36 605469352 5900.00 88.00 279.40 279558 2849.68 4037.61 094.88 -393263 HS 0.00 5.90 8944 50754775 6054709.68 6000.00 86.00 279.40 2799.07 2853.17 413431 11120 4031,22 HS 0.00 592 8944 507449.14 605472585 8100.00 88.00 279.40 2802.56 285866 423101 127.53 412.82 HS 0.00 594 89.44 507350.53 6054742.02 6200.00 88.00 279.40 2806.05 2860.15 4327.70 143.85 4228.42 05 0.00 5.95 8944 50725191 6054758.19 6300.00 88.00 279.40 2809.54 2863.64 4424.40 160.17 4327.02 HS 0.00 5.97 8943 50715330 6054774.36 6400.00 88.00 279.40 2813.03 286713 4521.10 176.49 4425.67 HS 0.00 5.98 89.43 50705469 6054790.53 6500.00 88.00 279.40 281652 2870.82 461780 192.82 -4524.21 05 0.00 600 8943 50695608 6054806.69 6600,00 88.00 279.40 282001 2874.11 471449 209.14 4622.81 HS 0.00 601 89.43 506857.47 6054822.86 6700.00 88.00 279.40 282350 2877.60 481119 225,46 472140 05 0.00 603 8943 506758.85 6054839.03 8800.00 88,00 279.40 282699 2881.09 490789 247.79 4821.00 HS 0.00 6,04 89.43 50666024 6054855.20 6900.00 88.00 279.40 2830.48 288458 5104.58 258.11 4918.60 05 0.00 6.06 89.43 50658163 6054871.37 700000 8800 27940 283397 2888.07 5101.28 274.43 -501720 HS 0.00 6.07 89.43 50646302 6054887.53 770000 8800 279.40 2837.46 2891.56 519798 290.75 -511579 HS 000 6.09 8943 50636440 6054903.70 72000 88.00 27940 2840.95 289505 5294.68 307.08 -521439 HS 0.00 6.10 89.43 50626579 6054919,87 7300.00 8800 27940 2844.43 2898.53 539737 323.40 -5312.99 HS 0.00 6.11 89.43 506167.18 6054936.04 7400.00 88,00 279.40 2847.92 2902.02 5458.07 339.72 -5411.58 HS 0.00 6,13 89.43 506068.57 6054952.21 7500.00 88.00 279.40 2851.41 2905.51 5584.77 356.04 -5510.18 HS 0.00 6.14 8943 50596998 6054968.37 7600.00 88.00 27940 2854.90 290900 5681.48 372.37 5608.78 HS 0.00 6.15 8943 505871.34 605498454 7700.00 88,00 27940 2856.39 2912.49 5778,16 388.69 -5707.37 HS 0.00 6.77 89.43 505772.73 6055000.71 7800.00 88.00 27940 2861.88 2915.96 587486 40501 5805.97 HS 0.00 6.18 8943 505674.12 605501688 7900.00 88.00 279.40 286537 291947 597156 42133 -5904.57 HS 0.00 6.19 8943 50557551 605503305 8000.00 88.00 279.40 2868.88 292296 6068.25 43766 -6003.17 HS 0.00 820 89.43 505476.89 8055049.22 8100.00 88,00 279.40 287235 292645 616495 453.98 -6101.78 HS 0.00 821 89.43 50537828 605506538 8200.00 88.00 279.40 287584 292994 626165 470.30 -6210.36 HS 0.00 623 8943 505279.67 605508155 8300.00 88,00 279.40 287933 2933.43 6358.35 486.63 -6296.96 HS 0.00 824 89.43 505181.06 6055097.72 8400.00 88.00 279.40 288262 293692 645504 502.95 -639755 HS 0.00 625 8943 505082.45 6055113.89 8500.00 8000 279.40 288631 2940.41 6551.74 519.27 -6496.75 HS 0.00 626 8943 50498383 605513006 860000 8800 279.40 2889.80 2943.90 6648.44 535.59 -6594.75 HS 0.00 627 8943 504885.22 6055146.22 870000 8800 279,40 2893.29 2947.39 674513 551.92 -669335 HS 0.00 628 8943 50478661 6055162.39 880000 88.00 279.40 2896.78 2950.88 6841.83 568.24 879194 05 0.00 6.29 8943 50468800 6055178.56 890000 8800 27940 2900.27 2954.37 6938.53 584.56 -6890.54 HS 0.00 6.30 89.43 50458938 6055194.73 900000 88.00 27940 2903.76 2957.86 7035.23 600.88 -698914 05 000 6.31 8043 504490.77 6055210.90 Drilling Office 2.7.998.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P1) 7/28/2015 5:15 PM Page 1 of 3 • • MD Incl Axin True NDSS NO VSEL NS EW TF DLS Directional 20ne ionel Exclusion Zane Wasting Northing Comments 1t) rl PI (0) (6) IDI Pt) 00 11 ('11998) Difficulty Index Alert (MS) (MPS) 9100.00 8800 279.40 290725 296135 7131.92 81721 -7087.73 HS 0.00 6.32 8943 504392.16 6055227.07 920000 88.00 279.40 2910.74 2964.84 7228.62 63353 -7186.33 HS 0.00 6.33 8943 504293.55 605524323 930000 88.00 279.40 2914,23 2968.33 ' 7325.32 64985 -728493 HS 0.130 6.34 8943 504194.94 605525940 9400.00 88.00 279.40 2917.72 2971.82 7422.02 666.17 -7383.53 HS 0.00 6.35 8943 504096.32 605527557 9500.00 88.00 279.40 2921.21 2975.31 7518,71 682.50 -7482.12 HS 0.00 6.36 89.43 50399771 605529174 9600.00 88.00 279.40 292470 2978.80 761541 198.82 -7580.72 815 0.00 6.37 89.43 503899.10 6055307.91 9700.00 88.00 27940 2928.19 298229 771211 715.14 -7679.32 HS 0.00 638 89.43 503800.49 605532407 9800.00 88.00 279.40 2931.68 2985.78 7808.80 731.46 -777791 HS 0.00 6.39 8943 50370187 6055340.24 9900.00 88.00 279.40 2935.17 2989.27 7905.50 747.79 -7876.51 HS 0.00 6.40 89.43 50360326 6055356.41 000000 88,00 279.40 293866 2992.76 8002.20 764,11 -7975.11 HS 0.00 641 8943 50350465 605537258 0100.00 88.00 279.40 2942.15 299625 8098.90 780.43 -8073.71 HS 0.00 6.42 8943 503406.04 6055388.75 0200.00 88.00 279.40 2945.64 2999.74 819559 796.76 -8172.30 HS 0.00 6.43 8943 503307.42 6055404.92 0300.00 88.00 27940 2949.13 3003.23 8292.29 813,08 -827090 HS 0.00 6.44 89.43 503208.81 6055421.08 040000 88.00 279.40 2952.62 3006.72 838899 829.40 -836950 HS 0.00 6.45 8943 503110.20 605543725 0500.00 88.00 279.40 2956.11 3010.21 8485.69 845.72 -846809 HS 0.00 645 8943 503011.59 605545342 0800.00 88.00 279.40 2959.60 3013.70 8582.38 862.05 -856669 HS 0.00 646 8943 502912.98 6055469.59 0700.00 88.00 279.40 2963.09 3017.19 8679.08 878.37 -866529 HS 0.00 6.47 8943 502814.36 6055485.76 080000 88.00 279.40 2966.58 3020.68 8775.78 894.19 -8763.89 HS 0.00 6.48 8943 50271575 6055501.92 0900.00 88.00 27940 2970.07 3024.17 8872.47 911.01 -8862.48 HS 0.00 6.49 89.43 502617.14 605551809 1000.00 8800 27940 2973.56 3027.66 8969.17 927.34 -896108 HS 0,00 6.50 8943 50251853 605553426 1100.00 8800 279.40 2977.05 3031.15 9065.87 943.66 -905968 HS 0.00 6.50 89.43 50241991 6055550.43 1200.00 8800 279.40 2960.54 3034.64 916257 959.98 -915827 HS 0.00 651 8943 50232130 6055566.60 1300.00 88.00 27940 298403 3038.13 9259.26 976.30 -925687 HS 0.00 6.52 8943 502222.69 6055582.77 1400.00 88.00 27940 2987.52 3041.62 935596 992.63 -9355.47 HS 0.00 6.53 8943 50212408 6055598.93 1500.00 8800 279.40 2991.01 304511 945266 2008.95 -9454.07 HS 0.00 6.54 8943 502025.47 6055615.10 1600.00 8800 27940 2994.50 3048.60 9549.36 202527 -9552.66 HS 0.00 654 8943 50192685 6055631.27 1700.00 8800 27940 2997.99 305209 964605 2041.60 -9651.26 HS 0.00 6.55 8943 501828.24 6055647.44 180000 8800 279.40 3001.48 3055.58 9742.75 2057.92 -974986 HS 0.00 656 8943 50172963 6055663.61 1900,00 88.00 279.40 3004.97 3059.07 9839.45 207424 -984845 HS 0.00 657 8943 501631 02 605567977 2000.00 88.00 279.40 3008.46 306256 9936.14 2030.56 -9947.05 HS 0.00 657 8943 501532.40 6055695.94 2100.00 8800 279.40 3011.95 3066.05 10032.84 2106.89 -1004565 HS 0.00 658 8943 501433.79 6055712.11 2200.00 88.00 279.40 3015.44 306954 10129.54 2123.21 -10144.25 HS 0.00 659 8943 501335.18 6055728.28 2300.00 88.00 279.40 3018.93 307303 10226.24 2139.53 -10242.84 HS 0.00 660 8943 50123657 6055744.45 2400.00 88.00 279.40 302242 3076.52 10322.93 2155.85 -10341.44 HS 0.00 660 8943 501137 96 6055760.62 2500.00 8800 279.40 3025.91 308001 10419.63 2172.18 -10440.04 HS 0.00 6.61 89.43 50103934 6055776.78 2600.00 88.00 279.40 3029.40 3083.50 10518.33 2188.50 -10538.63 HS 0.00 6.62 8943 500940.73 6055792.95 Cm 2/100 2637.30 88.02 279.40 303070 3084.80 1055240 2194.59 -10575.41 175.74R 0.00 6.62 89.43 500903.95 6055798.98 2700.00 86.75 279.49 303358 3087.68 10613.01 2204.87 -10637.19 175.746 2.00 8.63 88.18 500842.16 6055809.17 2800.00 84.75 27964 304098 309508 10709.57 2221.44 -10735,53 175.736 2.00 664 86.19 500743.81 6055825.59 2900.00 82.76 27979 305166 3105.96 10805.88 223822 -10833.50 175.71R 2.00 6.66 84.19 50064581 605584221 3000,00 80.77 279.94 3066.18 312028 10901.64 2255.18 -10931.00 175396 2.00 667 82.20 500548.30 605585902 End Cm 3096.50 78.84 28009 308326 313736 1099398 2271.70 -11024.52 HS 2.00 669 8028 50045476 6055875.39 3100.00 78.84 28009 3083.94 3138,04 1099732 2272.30 -11027.91 HS 0.00 6.69 80.28 50045138 8055875.99 3200.00 78.84 28009 3103.29 315739 11092.53 2289.49 -11124.50 HS 0.00 6.69 8028 500354.77 6055893.03 3300,00 78.84 280.09 312264 3176.74 1118775 2306.19 -11221.09 H5 0.00 6.69 80.28 50025616 6055910.07 3400.00 78.84 280.09 314199 3196.09 11282.97 232388 -11317.68 H5 0.00 6.70 8028 500161 55 6055927.11 3500.00 78.84 28009 3181.35 3215,45 11378.19 2341.07 -11414.27 HS 0.00 6.70 80.28 500064.94 6055944.15 Lower Ugnu 3594.01 78.84 280.09 3179.54 3233.64 11467.71 2357.23 -11505.08 HS 0,00 8.71 80.28 49997412 6055960.17 3600,00 78.84 280.09 3180,70 323480 1147341 235826 -11510.86 HS 0.00 6.71 80.28 49996834 6055961.19 3700.00 78.84 28009 3200.05 3254.15 1156863 2375.45 -11607.46 HS 0.00 6.71 8028 499871 73 6055978.23 3800.00 78.84 28009 3219.40 3273.50 11663,85 2392.64 -11704.05 HS 0.00 6.72 8028 49977512 6055995.27 3900,00 78.84 280.09 3238.75 3292.85 1175907 2409.84 -11800.64 H5 0.00 6.72 80.28 499678.51 605601231 4000.00 78.84 28009 3258.11 3312.21 1185429 2427.03 -11897.23 HS 0.00 6.72 8028 49958190 6056029.35 4100.00 78.84 280.09 3277.46 3331.56 11949,51 244422 -11993.82 HS 0.00 6.73 8028 499485.29 6056046.39 4200.00 78.84 280.09 3296.81 3350.91 12044.73 246141 -1209042 HS 0.00 6.73 80.28 49938869 6056063.43 4300.00 78.84 280.09 3316.16 3370.26 12139,95 2478.60 -12187.01 HS 0.00 6.74 8028 49929208 6056080.47 4400.00 78.84 280.09 3335,51 3389.61 12235.17 2495,79 -12283.60 HS 0.00 8.74 8028 49919547 605609751 4500.00 78.84 28009 3354.87 3408.97 12330.39 2512.98 -72380.19 HS 0,00 6.74 8028 499098.86 6056114.55 Schrader Bluff 14533.45 78.84 280.09 3361.34 3415.40 12362.24 2518.74 -1241250 HS 0.00 6.75 8028 498066.54 6056120.15 Top Cm 3/100 1458889 78.84 280.09 3388.20 342230 12395.98 2524.83 -12446.73 77,836 0.00 6.75 80.28 49903231 6056126.29 N Sequence 14579.94 78.91 280.42 337033 3424.43 12406.52 2526.76 -12457.40 77.77R 3.00 6.75 80.30 49902163 6056128.20 T. 1460000 79,04 281.02 3374.17 3428.27 12425.68 2530.42 -12476.75 77.668 3.00 6.75 80.33 499002.29 6056131.84 1470000 79.70 284.00 339262 3446.72 12521.97 255771 -12572.88 77.116 3.00 677 80.52 49590633 8056152.97 1480000 8038 28697 3409.92 3461.02 12619.35 2578.00 -12667.59 76.596 3.00 6.78 80.73 498811.39 6056179.12 N Top 14844.66 8069 288.29 341727 3471.37 12683.13 2591.34 -12709.57 78.378 3.00 6.79 80.84 498769.39 6056192.39 N Bottom 148888 8097 28/44 3423.52 3477.62 12701.69 2603.86 -12708.21 78.198 3.00 680 80.93 49873273 60562085 14900.00 8109 28992 3426.03 348013 12717.57 2609.23 -12781.20 78.726 3.00 6.80 80.97 498717.74 60562100.19 15000.00 8782 29286 344090 3495.00 12816.34 2645.29 -12853.27 75886 3.00 6.82 8124 49862503 6056246.11 15100.00 8257 29579 3454.49 3508.59 12915.40 2686.10 -12943.53 75286 3.00 683 81.53 49853531 6056286.78 75200.00 83.34 298.71 346575 3520.85 13014.48 273155 -1303175 74926 3.00 685 81.84 49844703 6056332.08 N Sequence 15208.03 83.40 298.95 3467.68 3521.76 1302243 273539 -13038.74 7498 3.00 6.85 81.86 49844004 6056335.92 Base 5300.00 84.13 301.63 3477.67 3531.77 3113.30 2781.50 -1377787 74.66 3.00 6.88 82.17 498361.04 605638190 5400.00 84.93 304.53 3487.20 3541.30 321159 2835.83 -13201.07 74.33R 3.00 688 8253 49827756 605643609 5500.00 85.75 307.43 3495.32 3549.42 3309.09 2894.37 -1328172 74.098 3.00 6.89 82.90 49819683 605649460 5800.00 86.58 310.32 3502.01 3556.11 3405.53 2958.98 -1335939 73.9R 3.00 6.91 83.30 498119.07 605655699 5700.00 87.41 313.20 350726 3561.36 3500.64 3023.49 -13433.87 73.75R 3.00 692 8371 498044.49 6056623.37 End Cm 5710.34 87.50 313,50 350772 3561.82 3510.39 3030.58 -13441.39 HS 3.00 6.92 83.76 49803697 605663045 5800.00 87.50 313.50 351163 3565.73 3594.84 3092.24 -13506.36 HS 0.00 6.93 83.76 497971.91 605669200 5900.00 8750 313.50• 351599 357009 368904 3181.07 -13578.83 HS 0.00 693 83.76 497899.34 805676065 600000 87.50 313.50 352035 3574.45 378323 3229.78 -1365130 HS 0.00 6.94 8376 49782677 605682930 6100.00 87.50 313.50 3524.71 3578.81 387742 3298.55 -13723.77 HS 0.00 6.94 83.76 49775421 605689795 6200.00 87.50 313.50 3529.08 3583.18 397162 3367.32 -13796.23 HS 0.00 695 83.76 49768164 6056966.60 OA Top 6295.94 87.50 313.50 3533.26 358738 4061.99 3433.30 -13865.76 HS 0.00 6.95 8376 497612.02 6057032.46 6300.00 87.50 313.50 3533.44 358754 4065.81 3436.09 -13868.70 HS 0.00 695 8376 497609.07 605703525 6400.00 87.50 313.50 353780 3591.90 4160,00 3504.86 -13941.17 HS 0.00 686 83.76 49753650 6057103.90 9541 Cap 18410.34 87.50 313.50 353825 3592.35 14169.75 3511.97 -13948.67 HS 0.00 696 83.76 497529.00 6057111.00 Tp10 Can Pt 04-1 Tap 6436.93 87.50 313.50 353901 3593.51 141979 353026 -13967.94 HS 0.00 696 8376 497509.70 6057129.26 Cry3.5/100 6460.34 87.50 313.50 3540.43 3594.53 14216.84 6 354635 -13984.90 151.749 0.00 6.96 8376 49749272 6057145.32 End Cry 6482.10 86.83 313.86 3541.51 3595.61 14237.30 356136 -14003.61 HS 3.50 6.97 8304 497476.98 6057160.30 650000 86.83 313.86 3542.50 3596.60 14254.12 3573.75 -14013.50 HS 0.00 887 8304 49746407 6057172.67 CIV 3/100 659796 86.83 313.86 3547.92 3602.02 14346.13 364152 -1408402 54.971 0.00 6.97 8304 49739346 6057240.33 6600.00 86.86 31381 3548.03 3602.13 14348.05 3842.93 -14065.49 54.971 3.00 6.97 8308 497391.98 6057241.74 6700.00 88.59 31135 3551.99 3606.09 1444277 371053 -44159.06 54.871 3.00 6.99 85.14 497318 32 605730922 7431 6781.69 90.00 309.35 3553.00 3607.10 14521.18 376342 -14221.30 54731 3.00 700 883 49725600 6057362.00 6800.00 90.32 30090 355295 360705 1453084 3774.97 -1423531 54731 3.00 7.00 8721 49724178 6057373.53 End Cry 6800.47 90.33 308.89 355295 3607.05 14539.29 3775.27 -14235.87 HS 3.00 7.00 8722 497241.41 6057373.83 6900.00 9033 30889 3552.38 3606.48 14635.49 3837.75 -14313.34 HS 0.00 7.01 87.22 497163.85 605743619 7000.00 90.33 30889 3551.81 360591 1473215 3900.54 -14391.18 HS 0.00 701 87.22 49708593 6057498.84 7100.00 90.33 30889 355125 3605.35 1482880 3963.32 -1446901 HS 0.00 7.02 8722 49700801 605756150 7200.00 90.33 308.89 3550.66 3604.78 14925.46 4026.10 -1454685 HS 0.00 7.02 8722 496930.08 6057624.15 Cry 2/100 7215.36 90.33 30889 355059 3604.69 14940.31 4035.75 -1455880 97.191 0.00 7.02 87.22 49691811 605763378 Tgt 2 7285.41 90.15 30750 3550.30 3604.40 15008.23 4079.06 -1461305 93.541 2.00 7.03 87.25 496863.00 605767700 7300.00 90.13 30721 355026 3604.36 1502242 4087.91 -14625.45 9354L 2.00 7.03 8727 49685139 6057685.83 End Cry 7367.90 90.05 305.85 3550.16 3604.26 15088.71 4128.33 -14680.01 HS 2.00 7.04 87.39 496796.77 6057726.16 7400.00 90.05 305.85 3550.13 360423 15120.13 4147.13 -1470603 HS 0.00 7.04 87.39 496770.73 6057744.92 7500.00 90.05 305.85 3550.05 3604.15 1521801 4205.70 -14787.08 HS 0.00 7.05 87.39 49668960 6057803.36 Cm 2/100 7546.77 90.05 305.85 3550.01 3604.11 1526379 4233.09 -14824.98 8997L 0.00 7.05 87.39 49665165 6057830.69 7800.00 90.05 304.79 3549.96 3604.06 15315.99 426387 -14868.42 69.981 2.00 7.06 8755 496608.18 6057861.39 7700.00 90.05 302.79 3549.88 3603.98 1541454 4319.48 -14951.52 69.98L 2.00 7.07 8785 49652500 6057916.87 T9t3 7789.44 90.05 301.00 3549.80 3603.90 15503.13 436873 -15027.45 33.998 2.00 7.08 88.12 49644900 6057964.00 7800.00 90.23 301.12 3549.77 3603.87 15513.61 4372.18 -15036.50 33.996 2.00 7.08 8827 49643994 6057969.44 End Cry 7852.77 91.10 301.71 3549.16 360326 15565.95 439969 -15081.54 HS 2.00 7.08 8905 49639487 6057996.87 7900.00 91.10 301.71 3548.26 3602.36 15612.74 4424.50 -1512171 HS 0.00 7.09 8905 496354.67 605802162 8000.00 91.10 301.71 3548.34 3600.44 15711.83 4477.05 -15206.76 HS 0.00 7.09 8905 49626954 605807403 8100.00 91.10 301.71 354442 3598.52 15810.91 4529.60 -15291.82 HS 0.00 7.10 8905 49618440 605812644 8200.00 91.10 301.71 354250 359660 15910.00 4582.15 -15376.88 HS 0.00 7.10 89.05 49609927 6058178.86 Cm 2/100 8221.43 91.10 301.71 354208 3596.18 15931.23 459341 -15395.11 140.161 0.00 7,10 89.05 49608103 6058190.09 7434 8292.77 90.00 300,80 3541.40 359550 16002.00 4830.42 -1545609 142641 200 7.11 88.10 49602000 8058227.00 8300.00 89.88 300.71 3541.41 3595.51 16009.18 4634.12 -1546230 142641 2.00 7.11 68.00 496013.78 605823069 End Cry 8343.48 89.19 300.19 354176 3595.86 16052.36 4656.15 -1549978 HS 2.00 7.12 8739 49597627 605825266 8400.00 89.19 300.19 3542.56 3596.66 1610858 4684.57 -15548.63 HS 0.00 7.12 8739 495927.38 605828100 8500.00 89.19 300.19 3543.97 3598.07 1620799 473485 -15635.05 HS 0.00 7.12 8739 495840.88 6058331.14 8600.00 89.19 300.19 3545.38 3599.48 16307.40 4785.13 -157214.9 HS 0.00 7.13 8739 495754.38 6058381.28 8700.00 89.19 300.19 354679 3600.89 16406.82 4835.40 -15807.92 HS 0.00 7.13 8739 49566788 6058431.42 Cry 2/100 874317 89.19 300.19 3547.40 360150 16449.73 4857.11 -15845.23 73.07R 0.00 7.14 87.39 49563054 6058453.06 Tgt5 879609 8980 301.20 3548.00 3602.10 16502.29 488612 -1589074 67326 2.00 7.14 87.54 49558500 6058480.00 8800.00 8953 30127 3548.03 3602.13 1650617 4886.15 -15894.08 67326 2.00 7.14 8756 495581 65 6058482 02 End Cm 883764 89.82 301.97 3548.25 360235 16543.48 4905.88 -15926.13 HS 2.00 7.15 87.75 49554958 605850170 8900.00 89.82 30187 3548.44 3602.54 16605.24 4938.90 -15979.04 HS 0,00 7.15 87.75 49549663 6058534.63 9000.00 89.82 30137 3548.76 360286 16704.29 4991.84 -46063.87 145 0.00 7.15 8775 495411 72 6058587.44 910000 89.82 30197 3549.07 3603.17 16803,33 5044.75 -16148.71 HS 0.00 7.18 87.75 49532681 6058640.24 Drilling Office 2.7.998.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P1) 7/28/2015 5:15 PM Page 2 of 3 • s Co meth MD IndAran True ND55 ND VSEC NS EW TF DLS Directional Zone l Exclusion Zone Angle E Northing M) f) r) on on on on on P) (V1001) Difculty Index Alert in (899)(4415) (MS) Cry 2/100 19169.07 89.82 30197 3549.29 3603.39 16871.74 5081.35 -16207.30 103.77R 0.00 7.16 8775 495268.16 605867672 19200.00 89.67 302.57 3549.42 360352 16902.35 5097.86 -16233.46 103.77R 2.00 7.16 8751 495241.99 6058693.19 TO6 19299.47 89.20 304.50 3550.40 3604.50 17000.45 5152.81 -16316.37 92.57R 2.00 7.17 86.75 495159.00 6058748.00 19300.00 89.20 304.51 3550.41 360451 17000.97 5153.10 -16316.80 92.57R 2.00 7.17 86.75 49515857 6058748.30 19400.00 89.11 306.51 3551.88 360598 17098.95 5211.18 -16398.19 92.546 2.00 7.18 86.36 495077.10 6058806.24 19500.00 89.02 308.51 3553.51 3607.81 17198.18 5272.05 -1647750 92.516 2.00 7.19 8598 49499770 6058866.99 End CN 19514.54 89.01 308.80 3553.76 3607.86 17210.25 5281.14 -16488.86 1/5 2.00 7.20 85.93 494988.33 6058876.05 1960000 89.01 308.80 3555.24 3609.34 17292.87 5334.67 -1655545 H5 0.00 7.20 85.93 494919.66 6058929.48 Cry 21100 19681.95 89.01 308.80 3556.66 3610.76 17372.11 5386.02 -16619.31 65.796 0.00 7.20 85.93 494855.73 6058980.72 19700.00 89.16 309.13 3556.94 3611.04 17389.54 5397.36 -16633.34 65.79R 2.00 7.21 86.02 49484168 6058992.04 19800.00 89.98 310.95 3557.70 3611.80 17485.66 5481.69 -16709.89 65.778 2.00 7.22 86.57 494765.03 6059056.24 T917 19802.69 90.00 311.00 3557.70 3611.80 17488.23 5463.45 -16711.93 65.126 2.00 722 86.59 494763.00 6059058.00 19900.00 90.82 312.77 3557.00 3611.10 17580.85 5528.41 -16784.37 65.13R 2.00 7.23 87.15 494690.46 6059122.84 20000.00 91.66 314.58 3554.84 3608.94 17675.01 5597.45 -16856.68 65.178 2.00 723 87.72 494618.06 605919176 End CN 20000.40 91.66 314.59 3554.83 3608.93 17675.38 5597.73 -18856.96 1-19 2.00 7.23 87.72 49461777 8059192.04 20100.00 91.68 314.59 3551.94 3606.04 17768.60 5687.62 -16927.86 1-15 0.00 7.24 87.72 494546.77 6059261.81 20200.00 91.66 314.59 3549.04 3603.14 17862.20 5737.79 -16999.05 HS 0.00 7.24 87.72 494475.48 6059331.86 Cm 1/100 2028452 9166 31459 3548.59 3600.69 1794131 5797.10 -1705922 139.591 0.00 7.25 87.72 49441522 6059391.08 20300.00 91.54 314.49 3546.16 3600.26 17955.80 5607.95 -17070.25 139.591 1.00 7.25 87.62 494404.18 605940191 Tgl8 20305.85 91.50 314.45 3546.00 3600.10 17961.28 5812.05 -17074.42 152.480 1.00 7.25 87.58 494400.00 6059406.00 End CN 20320.00 91.37 314.52 3545.65 3599.75 17974.53 5821.96 -17084.52 HS 1.00 7.25 8745 494389.89 6059415.90 20400.00 91.37 314.52 3543.73 3597.83 18049.45 5878.03 -17141.54 HS 0.00 7.25 87.45 49433279 6059471.67 20500.00 91.37 31452 354133 359543 18143.10 5948.12 -17212.83 HS 0.00 7.26 87.45 494261.40 8059541.84 20800.00 91.37 31452 3538.93 3593.03 18236.75 6018.21 -17284.11 HS 0.00 726 8745 494190.01 605961102 Cm 1/100 20656.42 91.37 31452 353758 3591.68 18289.59 6057.76 -17324.33 81511 0.00 727 87.45 49414973 605965129 20700.00 91.44 31408 3536.51 3590.61 18330.46 6088.18 -17355.51 81521. 1.00 7.27 87.57 49411851 805968167 20800.00 91.59 313.09 3533.87 358797 18424.66 6157.11 -17427.92 81.551 1.00 7.28 87.86 494046.01 6059750.47 T419 2080958 91.60 31300 3533.60 3587.70 18433.71 6163.64 -17434.91 75251 1.00 7.28 8789 494039.00 605975700 End Cry 2086228 91.74 312.48 3532.05 3586.15 18484.27 6199.87 -17474.11 HS 1.00 7.28 88.09 49399975 6059793.16 20900.00 91.74 312.48 3530.92 3585.02 18519.37 6224.86 -17501.41 HS 0.00 7.28 88.09 49397242 6059818.11 21000.00 91.74 312.48 352790 3582.00 18614.19 6292.37 -17575.12 HS 0.00 729 88.09 49389861 6059885.49 21100.00 91.74 312.48 352487 3578.97 18709.00 635988 -17648.83 HS 0.00 729 88.09 49382480 6059952.88 21200.00 91.74 312.48 3521.84 3575.94 1880382 6427.38 -17722.55 HS 0.00 729 88.09 493750.99 6060020.26 Cry1/100 21230.04 91.74 312.48 3520.93 3575.03 18832.30 6447.66 -17744.69 176.13R 0.00 7.30 88.09 493728.82 6060040.51 21300.00 91.04 31253 3519.23 3573.33 18898.64 6494.92 -17796.25 176.13R 1.00 7.30 8740 493677.19 6060087.68 Tgt10 21313.81 90.90 31254 3519.00 3573.10 18911.74 6504.26 -17806.43 17666R 1.00 7.30 8726 493667.00 6060097.00 End Cry 2139125 90.13 312.59 3518.31 357241 18985.15 6556.63 -17863.46 HS 1.00 7.31 86.49 493609.89 6060149.28 21400.00 90.13 31259 3518.29 3572.39 18993.45 6582.55 -17869.90 HS 0.00 7.31 86.49 49360344 6060155.19 21500.00 90.13 31259 3518.07 3572.17 19088.25 6630.22 -17943.53 HS 0.00 7.31 8649 493529.72 6060222.74 21600.00 90.13 312.59 3517.84 357194 19183.06 6697.89 -18017.15 HS 0.00 7.32 86.49 493455.99 6060290.29 21700.00 90.13 31259 3517.62 3571.72 19277.86 6765.56 -18090.78 HS 0.00 7.32 86.49 49338227 6060357.83 Cry 1/100 21783.15 90.13 31259 3517.44 3571.54 19356.69 6821.82 -18152.00 111968 0.00 7.32 86.49 493320.97 6060414.00 21800.00 90.06 312.74 3517.41 3571.51 19372.66 6833.24 -1816439 111960 1.00 7.32 8640 493308.58 6060425.40 T9111 21817.10 90.00 312.90 3517.40 3571.50 19388.85 6844.86 -18176.94 104.368 1.00 7.32 86.32 493296.00 6060437.00 End Cry 21836.13 89.95 313.00 3517.41 3571.51 19406.84 685784 -18190.85 HS 1.00 7.33 8624 493282.06 6060449.95 21900.00 89.95 313.08 3517.46 3571.56 19467.21 690147 -18237.50 HS 0.00 7.33 8624 493235.35 6060493.50 22000.00 89.95 313.08 3517.54 3571.64 19561.74 6969.78 -18310.54 HS 0.00 7.33 86.24 49316222 6060561.69 22100.00 89.95 313.08 3517.63 357173 19658.26 7038.08 -18383.57 HS 0.00 7.34 8624 493089.09 6060629.88 22200.00 89.95 313.08 3517.71 3571.81 19750.78 7106.39 -18458.61 HS 0.00 7.34 86.24 493015.95 6060698.07 Cry1/100 22226.35 89.95 31308 3517.73 3571.83 19775.69 7124.39 -18475.85 17987L 0.00 7.34 8624 492996.88 6060716.04 22300.00 89.22 313.08 3518.26 3572.36 19845.30 7174.70 -18529.64 179.871 1.00 7.35 8551 492942.82 6060766.25 T9112 22321.63 89.00 313.08 3518.60 3572.70 19865.75 7189.47 -18545.44 179.131 1.00 7.35 85.30 492927.00 6060781.00 End Cry 2238428 88.37 31307 3520.04 3574.14 19924.96 7232.25 -18591.19 HS 1.00 7.35 84.68 492881.19 6060823.70 22400.00 8837 313.07 3520.48 3574.58 1993981 7242.98 -1860266 HS 0.00 7.35 84.68 49286970 6060834.41 22500.00 88.37 31307 3523.32 3577.42 20034.30 731124 -18675.68 HS 0.00 7.38 8468 492798.58 606090256 22600.00 88.37 313.07 3526.16 3560.26 20128.79 7379.51 -18748.70 HS 0.00 7.36 8468 492723.46 6060970.70 22700.00 88.37 313.07 3529.00 3583.10 2022328 7447.77 -18921.72 HS 0.00 7.37 84.68 492650.35 6061038.85 Cry1/100 2278223 88.37 313.07 3530.76 3584.86 20282.09 7490.28 -18867.16 2.498 0.00 7.37 8468 49260484 606108125 22800.00 88.75 313.09 353171 3585.81 20317.77 7516.04 -18894.74 2.49R 1.00 7,37 85.05 49257723 6061107.00 T9113 2282423 89.00 313.10 3532.20 3586.30 20341.34 7533.08 -18912.94 2.37R 1.00 7.37 8530 492559.00 6061124.00 22900.00 89.75 313.13 3533.02 3587.12 20412.27 7584.38 -18987.74 2.37R 1.00 7.38 88.04 492504.13 606117521 End Cry 22919.04 89.94 313.14 3533.07 3587.17 20430.26 7597.39 -18981.63 HS 1.00 7.38 8622 49249022 6061188.20 23000.00 89.94 313.14 3533.15 3587.25 20506.76 7652.75 -19040.71 HS 0.00 7.38 8622 492431.06 6061243.47 23100.00 89.94 313.14 3533.28 358736 20601.26 7721.13 -19113.68 HS 0.00 738 8622 492358.00 6061311.72 23200.00 89.94 313.14 3533.36 358746 20695.75 7789.51 -19186.65 HS 0.00 7.39 8622 492284.93 6061379.98 Cry 1/100 23294.00 89.94 313.14 3533.46 358758 20784.57 7853.78 -19255.24 170.171 0.00 7.39 8622 49221624 6061444.14 23300.00 89.88 313.13 3533.47 358757 20790.24 7857.88 -19259.62 170.171 1.00 7.39 86.17 49221186 606144824 T9114 2332853 89.60 313.08 353360 358770 20817.21 7877.38 -19280.45 167.951 1.00 7.39 85.89 492191.00 6061467.70 End Cry 23359.98 89.29 313.01 3533.90 358800 20846.93 7898.84 -19303.43 HS 1.00 7.40 85.60 492167.99 6061489.12 23400.00 89.29 313.01 3534.40 3588.50 20884.78 7926.14 -19332.69 HS 0.00 7.40 85.80 492138.69 6061516.38 23500.00 89.29 313.01 3535.63 358973 20979.33 7994.36 -19405.80 HS 0.00 7.40 85.60 492065.48 6661584.47 23600.00 89.29 313.01 3536.87 3590.97 21073.89 806257 -19478.91 HS 0.00 7.41 85.60 49199227 6061652.56 23700.00 89.29 313.01 3538.10 359220 21188.44 8130.78 -1955203 HS 0.00 711 85.60 491919.06 6061720.66 CN 1/100 23761.35 89.29 313.01 3538.86 359296 21226.46 8172.63 -19596.88 6.96 0.00 7.41 85.60 491874.14 6061782.43 23600.00 89.68 313.06 353921 3593.31 21263.00 8199.01 -19625.13 8.98 1.00 7.41 85.97 491845.86 6061788.76 Tgt 15 23832.82 90.00 313.10 3539.30 3593.40 21293.83 8221.29 -19648.95 2.76R 1.00 7.42 8629 491822.00 606181100 2390000 91.01 313.15 3538.71 3592.81 21357.50 8267.35 -19698.13 2.768 1.50 7.42 87.28 491772.76 6061856.98 End Cry 23956.39 91.85 313.19 3537.30 3591.40 21410.75 8305.91 -19739.24 HS 1.50 7.43 88.11 49173159 6061895.48 24000.00 91.85 313.19 3535.89 358999 21451.93 8335.74 -19771.03 HS 0.00 7.43 88.11 49169976 6061925.26 24100.00 91.85 313.19 3532.65 358675 21546.34 8404.15 -19843.90 HS 0.00 7.43 88.11 491626.79 6061993.54 Cm 1/100 2415081 91.85 313.19 3531.01 3585.11 21594.32 8438.91 -19880.92 176.821 0.00 7.43 8011 491589.72 6062028.24 24200.00 91.36 313.16 3529.62 3583.72 21640.77 8472.55 -19918.78 176.831 1.00 7.44 87.63 491553.81 6062061.82 24300.00 90.37 313.10 3528.12 3582.22 21735.25 8540.91 -19989.75 176.631 1.00 7.44 86.65 491480.74 6062130.06 Tgt 16 2433657 90.00 313.08 3528.00 3582.10 21769.82 8565.89 -20016.46 167.681 1.00 7.44 8629 491454.00 6062155.00 End Cm 2433891 89.98 313.07 3528.00 3582.10 21772.03 8567.49 -20018.17 HS 1.00 7.44 86.27 49145229 6062156.60 24400.00 89.98 313.07 3528.02 3582.12 21829.78 8609.21 -20062.79 HS 0.00 7.45 86.27 491407.61 6062198.24 24500.00 89.98 313.07 3528.06 3582.16 21924.30 8677.51 -20135.84 HS 0.00 7.45 86.27 491334.46 6062286.42 24800.00 89.98 313.07 3528.10 3582.20 22018.83 8745.80 -20208.88 HS 0.00 745 8627 491261.32 6062334.59 24700.00 89.98 313.07 3528.14 358224 22113.36 8814.10 -2028193 1/5 0.00 7.46 86.27 491188.17 6062402.77 24800.00 89.98 313.07 3528.18 3582.28 22207.89 8882.39 -2035497 HS 0.60 7.48 8627 491115.03 6062470.94 Cry 1/100 24837.39 89.98 313.07 3528.20 3582.30 22243.23 8907.93 -20382.29 5.01R 0.00 746 8627 491087.68 6062496.43 19117 24839.69 90.00 31308 3528.20 3582.30 22245.40 8909.50 -20383.98 17.84R 1.00 7.46 8629 491086.00 6062498.00 End CN 24840.88 90.01 313.08 3528.20 3582.30 22248.53 8910.31 -20384.84 HS 1.00 7.46 8630 491085.13 6062498.81 24900.00 90.01 313.08 3528.19 3582.29 22302.42 8950.60 -20428.02 HS 0.00 7.47 8630 49104189 6062539.12 25000.00 90.01 313.08 3528.17 3582.27 22396.94 9019.00 -20501.06 HS 0.00 7.47 86.30 490968.75 6062607.31 25100.00 90.01 313.08 3528.15 3582.25 2249147 9087.30 -20574.09 HS 0.00 7.47 86.30 490895.61 8062675.49 25200.00 90.01 313.08 3528.13 3582.23 22585.99 9155.60 -20647.13 HS 0.00 7.48 86.30 490822.48 6062743.67 25300.00 90.01 31308 3528.11 3562.21 22680.52 9223.90 -20720.17 H5 0.00 7.48 86.30 490749.34 6062811.85 TD 2534421 90.01 313.08 3528.10 3582.20 22722.31 9254.10 -20752.47 0.00 748 86.30 49071700 8062842.00 Survey Error Model: ISCWSA Rev 0"'3.5 95.000%Confidence 2.7955 sigma Survey Program: Description Part MD From MD To EW Freq Hole Sire Casing Diameter Survey Tod Type Borehole/Survey 111 Iftl lin) OM 1 0.000 2300.000 1/100.00000 16000 13.375 SLB_NSG•SSHGT SP213-NW31P28-11W3(P5)g4 I 2300.000 2783.673 1/100.000 16.000 13.375 SLB MW0+045 SP28-14W1 SP28-NW3 2 2300.000 2783.673 1/100.000 16.000 13375 SLB MWDIGMAG SP28-NW31P28-NW3(85)084 2 2783.673 4280.000 1/100.000 12.250 9.625 SLB MWD+SAG 0P28-140 W31 P28-NW3(P5)0p4 3 2783.673 16410.341 1/100.000 12.250 9.625 SLB MW0+5MAG SP28-4693/SP28-9W3(P5)0p4 3 16410.341 17900.000 1/100.000 8.750 5500 SLB_MWD+SAG SP28-NW3/SP2&NW3(P5)ap4 4 16410.341 25344215 1/100.000 8.750 5500 SLB_MWD.GMAG SP28-13013/SP28-NW3(P5)0p4 Drilling Office 2.7.998.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P1) 7/28/2015 5:15 PM Page 3 of 3 9 0 o o oo o \ -4- \ , o , . , . . \ § ! . § `r a: §) ! ! ._ ! . ! e _ ` / ;§ _ )) \ j \= -a ! ( \ MI f m ;r , , ) jr ° _ \ = '} !§ = 2 Ca \ - e 01 ' # / ! �° . / ~ . § § 0 . 1 ( 9 :r - 7 | az a 2 — — co , 2 z r ) £ a- — r •; >! 0 - 0 § e k \ k ( \ % co — E I § §§ / • * 2 o: 0 rte t r r : (0 ) _ _ CV / 7• ZW § \) \.- , »; 8 N— ' § /(. n .f oo 0 - rrr § : . _ | f 2 - EL t U) (7., . . ./§ ){*) j§ , 2 ``` • {r:(\/ al cD ( 2 r 2 . i �§ ~§ 0 . ,: !, . me CD § ;_! ; 2_! :: lr:; ! . . ' 2 §§/] `® lg:i6[ • ! • `r V'1 ; \ P. ' , _; �, !. g 76 ! i r ( r � � ^ ' ! ia ! \j • . § rel , _co )§/\ '" §§ ;)\§ ' q' - , ~ " / 4 00 . ` \ / , • \ ('Z' ! ), \, \ � o s . . la / . / § , . / �, c n0_§ ; / P.n} : §:.§ ][ ^§ ! . ti-4- '.2. sag( ; f ,5 � s0:rr !, . :Z. `i/` ! , CV| ® ) ,7 ^ { r , :, ^ , , CL , \ £ s :Li / § \c CO ` 8 0Tt % ! ; +0024=eq W)SN m co ®® > - • coIs, \) \| [ \ -0 a i„.„ ' = i _ � I ! i I WI ns \. 1 •E ( - co , =cOoD 2 — / 6 /0 0 e/ � \ Ifl ! I §f ! , iiiii , • ., © f - : • '12T, E i ,; - § , - B � j§ , = .• ° • _iiiii )[ Ti0 - - •^ @ ; a ! - « {| _ " o § m \/ ' i ] \ v | j\ ' ' \ w z \ • " \ Cr) `� II CO � • §� - z - Fi • ^ -, \ ' | i | %I ii ( o . 0 0 } /• } ' ' I . . I ' /! \ 9 (U \ ii: t_ I : ~ _ ,0 . ] ` : � ��P .o §\ 0 00 c0 4 - . _ co `" 0 . )o § • e Ilii . - j E E . ; - ) k Z \ . ��` o \ ® KO . CO` F ` ) O !j ! ` .- ) Q { a a 2 0 / �� 7 Co . -J � - 4 2 :. $ .. .. 1621i HMI ° _ • -23- gg . 82 / 2 i 0`. - )\ . � (\ a . •. 0 , ; • !` ; _ !2i\to.i i / © Z. sfZ2 F ! \il© ' • . . o , - , R;iiii . . ,c ~ § ! U\ : \ / . .. / !\} vt - vijk L C Z § k / ƒ r o / /c allk q £ \ � / \ / - o o .o o . 0. o o ; � 2 _ ; ® _ . / } , § ƒ r , « § N q = 0 0 0 0 Vo e=7a&QAI ) ] \ )) a L; P &maa=7q(u)ani m 1 ! ! 0 • Attachment 3 Drilling Hazards Summary Dri ing Hazards Summary 16" Open Hole / 13-3/8" Casing Interval Hazard Risk Level Mitigation Strategy Broach of Conductor Low Monitor continuously during interval. Gas Hydrates Moderate Control drill, Reduced pump rates, Reduced drilling fluid temperatures, Additions of Lecithin. Running Sands and Low Maintain planned mud parameters, Increase Gravels mud weight, use weighted sweeps. Hole swabbing on trips Moderate Trip speeds,proper hole filling (use of trip sheets), pumping out 12-1/4" Open Hole / 9-5/8" Casing Interval _ Hazard Risk Level Mitigation Strategy Running Sands and Low Maintain planned mud parameters, Increase Gravels mud weight, use weighted sweeps. Gas Hydrates Low Control drill, reduced pump rates, reduced drilling fluid temperatures, additions of Lecithin. Stuck Pipe Low Good hole cleaning,pre-treatment with lost circulation material, stabilized BHA, decreased mud weight Abnormal Reservoir Low BOP training and drills, increased mud weight. Pressure Lost circulation Low Reduced pump rates, mud rheology, LCM Hole swabbing on trips Moderate Trip speeds, proper hole filling(use of trip sheets), pumping out 8-1/2" Open Hole / 5-1/2" Liner Interval Hazard Risk Level Mitigation Strategy Abnormal Reservoir Low Stripping drills, shut-in drills, increased mud Pressure weight. Stuck Pipe Low Good hole cleaning, PWD tools,hole opener runs, decreased mud weight Lost Circulation Low Reduced pump rates, mud rheology, LCM Hole Swabbing on Trips Moderate Trip speeds, proper hole filling(use of trip sheets),pumping out, backreaming • • Attachment 4 BOP & Diverter Configuration • • ts N _O N oO Ngeg70116 WWW--'on - }Z 00Z n 4bD ¢ NaU m w O., 0 Oz m 0 li it, BB D. -, o Z a i '701 ^O O_ ',0:.., z- > = O J O Z a m Y O m m H ¢ N M N (D N H �• m 0 1 ::: :- B . _ : . ,, , g .2,1:: g , , c, w i Z lui O ¢ G\ .I. N r4[] N J Z co W N c tap- m>O `� O ellpR c 8P Q g( I Q W ^ g = Yu7Z C7 _J_ _Q 4-( I .O a \p m ij X. -�- tp l Z ij 4 1--- i-._a \ O m ¢ ¢ _ccs U_ F z JL 1. 5 8 e s p S S $ � g 4 n-'w K. 1.6 0 1 \ 72E ! �f �d d! .,r 4d DIM [Intl IT/ ft i — -,—Z — _1 1 —'-- ---------[-I ----- '---- — .Wim.c �� ci ....,__' EEE o k LIITI- VI Ak . _—_— w-iii ax� so . >R � 1:1 1,, z 4I■gi! 0 8 I - a I ��1 i ij u . j n j 0110111.111011___i o Ws s.« j jcc i • • 6 i cc t d li b v-Lii n¢ n E m _ m E r,N I,N r,N NI,NI.N N oo� �cO�N�N.- D� c0.--in CD in CinCD CD in CD in CD in01n n~ , 8- Mt 466 cO mrr co W 00100-mNNMMtt1n WINErn W co 0000-�NNMMt 466 8 b ¢j Yii �$a 666666ro�<ococ 66r<nrl:r-��r:����i<r:n�n��no»�adDOaoa00000aoaoao 0 zma U o 82 >-0.c a O V iti p Di IT 6 W C 8 0 .-N ' )0 N Na F ) COCOO) .-NM .COCON 0) - ML.IONa00) NM .CON a]O] -NM 2 m N L` -g feF N�MMMM M MMM pj 'tt tt y t 4444'n 66InIn ltS 6 u-i66 up 6666 co 66c0cD r"r r r `h N 82 U a' F� 7 N �W ma � m W O 8 in O In OInC 0 0't CD sr Ct0 Ot on trn,r a,t co NMNMWMWMW CO M CO M N-NI-N W m -N N M M t.V In In In CO W r r W Wa000v-,-N NM M Q t cn In UD co r r W OD 2000'-.-NNM 1-7L.P. NI,Ni t Ni Ni Ni Y a'Ni Ni Ni Ni,t t t Y 46In N Nan ui N di Lei In In di di'ui di In N N N N di(D tO CO CO)D)O o t ] a H i20). 3 E o Q i pp no cn -NM't Ln UD t`W 0 �NMt cn cO l�W 0 .-NM"t Lr'DN W 5�� .g Z . t co(`co O W N a Lo co r 0 0 0 0 O 0 6O 0 0 N NN N N N N N N OF NNN CO NCO 0101010101001001 S 0 7 0 a ti d 10 a 1 O f-H___-- -II..1 , 1 I� w= - o� Wo m Nm LL 3 d / 3 011* II CY Wo • • t al w it SI c.....4 r r III iiilik , ip E 0oa ii m VI ca &Ilk i cf) V 0 @ I° m ,_.2 cuO. A. Vr- I- . ......._Nt , 4„ ,,,, ii• au. ,,,,_-- 1- alvi, 0, 4 -NI ,,,, Avi-t11111111 00.i. kiii, .,,,,Av-411 es. , vie--., tit i# iiiiie e. ,..- - .., im„,, „„„„,....Lioi ...., 0 ‘i ei v . . iit 0., ANEW Wm., o iiio , 9 9 " › c Jawri 0 ...., .rr > ; I-- CI, 2 >c) ;$ > 11110 cy — O0 d 0 a 0 VII" c ca ai J Qo R w v 8 0 a) a > 0 a E „ .. 0 R z p m V r Q a oma_ 4 m 0 Tu _ � N ce CI U e .14 2 N 2 X.) LI O N O ep lC s ip s tp W W _ � ; t � z x z N H J 6 2 ( ' r. u co; j' T _ ogoo44a40i'gg.gg �� �!!!g! gggggg ggOg gkkkgkkYk!!!!!! kkkkkkkkk°k kkkkkkkkk 9 e a a a a..........4 t t t t i o ` xddd;;53i561detd@gi�i555�5Fxieijgk�R@RR#RkRlkRRRRR@@�@1 N z ,11 s 0 i ! F, 8p q pp ES' .51..5 aw WA rl< FFF/ 6G LI-gN 0 150.0 1 gg 00 ilifikkill gi iiii 011 4:: ,., 11 1r i;,. g g g r!Q g g -moo Lao PI 111111111 1 so Og � �illhh��� �� � �� � i"i 'O'i 1 1111111 11 IOW lillii0211111110011 3 t8 - 1111111111ffliiiiiilliNNiilliimiiiii .1 i g.8 12, ad 111111111111111'111111111111111111611111 "N s N 221'1' I g L3 -' i Pp a ,30 wg a a k s N„ gLL P " "ma v t_-. '-'8 1? o g g ' la .ga �' g Www N w _ SIR iINm 4111 `, zzz V a ;? ,, �/ o 0000 oa , iaAii g W Oo yO W occcc000$@ F. a 2 •a. � gg _ EgIANEAE2NNN , W i i i i l i i i ^o Q !: ws?, 44z4�� pi .9-.988 L w = w 141— / imron �;;3p� .=off } IQE� NO3od r/_I<o L 1 2i{ / i\ Qoo''`=oLN J r i $ .0-A0B----r-- - -1 "--., -38088 11930I,8 30186-- `w , -- • r 9-.me .j›\f//\.\•<.., .-. s2--, i, ,5-'. ' *A /`//�/'c.'e a / ; 1 1 icy` §§§1;.ss : 1 B go .0-,009-i-- _— ... ri--__= I £ �� .0-.009 Ig :"›, N1 •-I' • ' \ `,j.I Tin E- 1•S c�u�'�•S .1 :11 41 1 b is E8ESSSSE I % 0 I •��,IIi •I• • R1 I o C o 0owwuu E /\ O - I / • •• ,- 1 I ��I _ iV 11“ _ mffAi •I .141 M4181.' 8$2p I > K 5 m- Y elle -...---.. ..-..-..7„-..:,----..,....'4o b A_,W�_y___ p3I _ _ •!L��Q s.e -1 _ L .0-.00• M 5, Ai ' ` ` 111 ®/ ` CO a Souza I [:tel n LL�� . 9 5?. ag M " /� N !I _ I 98380®A .o-A03-,--'- -,.,/.1.-:, Mti n' t- --+-t7— // `;,L,W• 1Ov , c , ;-**iph,:vM k io LL G 15 � d� \1tlOddB yiI -x.1`,�( $ i 1 I'' — $ \ / � � ` _ - 4I b I I_ I �=I�_�_ 9r���� j 3YHJJL0011838 11 _ __ 31110tl 3Z1AY01! _ �t 090 �'�`I r ' In _� / c LE Jar r,,_ s3 ��> } i,1 �� I a • • Attachment 5 Cement Loads & CemCADE Summary • • Schlumberger CemCADE*well cementing recommendation for 13 3/8" Surface Casing Operator : Eni Petroleum Well : SP28-NW3 Country : USA Field State : Alaska Prepared for :Andrea Lazzari Location : Spy Island Proposal No. : Initial Service Point : Prudhoe Bay Date Prepared : 7.28.15 Business Phone : 907.659.2434 Prepared by : Jenna Houston Phone : 907.223.8916 E-Mail Address : jhouston2®slb.com Q $1„, C 010 9 140AT E Disclaimer Notice: Schlumberger eubmi s this document with dm benefit of its judgment,experience.end good oilfield practices. This information is provided is accordance with generally accosted Mosby practice,relying on facts or iMomwtbn presided by others.limitations,computer models,measumnndx assumptions end Inferences the are not infallible. Calculations are estimates based on provided informedon.All imposes.recommendations,on predictions are opinimaonly. NO WARRANTY IS GIVEN CONCERNING ACCURACY OR COMPLETENESS OF DATA,INFORMATION PRESENTED,EFECTNENESS OF MATERIA!,PRODUCTS OR SUPPLIES.RECOMMENDATIONS MADE,OR RESULTS OF THE Services RENDERED. Freedom from inhipemmd of any intellectual property rights of Schlumberger on others isnot to be inferred and no a oIMAonl property rights aro granted hereby. Mark of Schlumberger Page 1 SP28-NW3 cemcade v1 728.15.cfw;07-28-2015; Load0ase Surface 13 3/8;Version wcs-cem476_02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 1: well description Configuration :Casing Stage :Single Rig Type : Land Mud Line :0.0 ft Total MD :2784.0 ft BHST :50 degF Bit Size : 16 in ft {:x WOO: psi L y U 1 2 • ,5 B. Fer^afrost L lgnu Top rU64: ID Well Litholog;• Formation Press Page 2 SP28-NW3 cemrade N 7.21315.cfw;07-28-2015; loedCese Surface 133/8:Version wcs.cem476_02 i • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Previous String MD OD Weight ID (ft) (in) (Ib/ft) (in) 160.0 20 169.0 18.250 Landing Collar MD :2704.0 ft Casing/liner Shoe MD :2784.0 ft Casing/Liner MD OD Joint Weight ID Grade Collapse Burst Thread (ft) (in) (ft) (lb/ft) (in) (psi) (psi) 2784.0 13 3/8 40.0 68.0 12.415 L-80 2270 5020 BTC Mean OH Diameter :16.000 in Mean Annular Excess :135.4% Mean OH Equivalent Diameter:18.985 in Total OH Volume :918.7 bbl (including excess) Caliper and Hole Size Data MD Caliper Excess Equiv.Diam. (ft) (in) (%) (in) 1860.0 16.000 190.0 20.063 2784.0 16.000 35.0 16.822 Page 3 SP28-NW3 cemcade v1 7.28.15.cfw;07-28-2015; LoadCase Surface 133/8;Version wcs-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Max.Deviation Angle :55 deg Max.DLS :3.261 deg/100ft Directional Survey Data MD TVD Deviation Azimuth Dogleg Sev. (ft) (ft) (deg) (deg) (deg/100ft) 0.0 0.0 0.0 297.0 0.000 100.0 100.0 0.0 297.0 0.000 200.0 200.0 0.0 297.0 0.000 300.0 300.0 0.0 297.0 0.000 400.0 400.0 1.0 297.0 1.000 500.0 499.9 3.0 297.0 2.000 600.0 599.6 5.8 297.0 2.750 700.0 698.8 8.5 297.0 2.750 763.3 761.3 10.2 297.0 2.747 800.0 797.4 11.3 297.0 2.756 900.0 894.9 14.0 297.0 2.750 1000.0 991.3 16.8 297.0 2.750 1100.0 1086.4 19.5 297.0 2.750 1119.1 1104.4 20.0 297.0 2.771 1200.0 1179.8 22.3 297.0 2.745 1300.0 1271.4 25.0 297.0 2.750 1392.2 1354.1 27.5 297.0 2.754 1393.7 1355.4 27.5 297.0 0.000 1400.0 1361.0 27.6 297.0 0.495 1500.0 1449.4 28.1 296.7 0.507 1600.0 1537.5 28.5 296.4 0.496 1700.0 1625.1 29.0 296.2 0.506 1800.0 1712.4 29.5 295.9 0.495 1859.5 1764.1 29.8 295.8 0.503 1900.0 1799.2 30.0 295.7 0.506 1963.5 1854.1 30.3 295.5 0.487 2000.0 1885.4 31.4 294.9 3.023 2050.8 1928.5 32.8 294.0 2.987 2100.0 1969.5 34.2 293.3 3.006 2200.0 2050.7 37.1 291.9 3.000 2300.0 2128.9 40.0 290.7 2.996 2363.5 2176.9 41.9 290.0 2.999 2400.0 2203.8 43.0 290.3 3.254 2451.0 2240.6 44.7 290.7 3.261 2500.0 2275.0 46.2 291.1 3.250 2600.0 2342.1 49.5 291.8 3.249 2700.0 2404.9 52.7 292.4 3.247 2784.0 2454.3 55.3 292.9 3.236 Formation Data MD Frac. Pore Name Llthology (ft) (lb/gal) (lb/gal) 763.0 11.50 8.40 SV-4 Siltstone 1119.0 11.50 8.40 SV-3 Sandstone 1394.0 11.50 8.40 SV-2 Siltstone 1860.0 11.50 8.40 B/Permafrost Shale 2051.0 12.00 8.40 SV-1 Sandstone 2451.0 12.50 8.40 Ugnu Top(UG4) Shale 2784.0 12.50 8.40 TD Shale Page 4 5P28-1,1W3 cemcade v17.28.15.cfw;07-28-2015; LoadCase Surface 13328;Version wcs-ceen476_02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Geothermal Temperature Profile MD TVD Temperature Gradient (ft) (ft) (degF) (degF/100ft) 0.0 0.0 20 0.0 1860.0 1764.5 32 0.7 2784.0 2454.3 50 1.2 ft degF (x 1000)ft _ 0 2n 40 60 r r r 6 0 9 1 2 _ I I EliMil N O O rfi Q Lc, G f' I, 1 L' O d 0 ,- t _ V O C O .- 0 O O i o_ 47 ,t 0 o � CV 0.1 o N., 0 Li Temperature Hon Departure Page 5 SP28-NW3 comrade v17.28.15.dw;07-28-2015; LoadCase Surface 133/8;Version wcs-cene476_02 • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 2: fluid sequence Job Objectives: Cement Surface Casing with Returns Seen at Surface Original fluid Mud 9.50 lb/gal k:8.28E-2 Ibf.s^n/ft2 n:0.262 Tr:0.48 lbf/100ft2 Displacement Volume 404.9 bbl Total Volume 1003.5 bbl TOC 0.0 ft Fluid Sequence Name Volume Ann.Len Top Density Rheology (bbl) (ft) (ft) (lb/gal) MUDPUSH II 100.0 0.0 10.10 k:2.54E-2 Ibf.s^n/ft2 n:0.420 Ty:13.04 lbf/100ft2 Surface Lead 435.6 2279.0 0.0 10.70 k:1.46E-1 Ibf.s^n/ft2 n:0.350 Ty:1.41 lbf/100ft2 12.5ppg DeepCRETE 63.0 505.0 2279.0 12.50 k:1.68E-1 Ibf.s^n/ft2 n:0.301 Ty:0.44 lbf/100ft2 Surface Tail Fresh H2O 10.0 2637.2 8.34 viscosity:5.375 cP Mud 394.9 0.0 9.50 k:8.28E-2lbf.s^n/ft2 n:0.262 Ty:0.48 lbf/100ft2 Static Security Checks Frac 7 psi at 160.0 ft Pore 19 psi at 160.0 ft Collapse 2005 psi at 2704.0 ft Burst 5020 psi at 0.0 ft Csg.Pump out 59 ton Check Valve Diff Press 180 psi ft (x 1000)psi - 0 2 O_ ci rJ Fluid Sequence Static Well Security Page 6 SP28-NW3 cemcade v17.28.15.cfw;07-28-2015; Loadrase Surface 133/8;Version wcs-ce 476_02 0 • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 3: pumping schedule - Spacer/Cement Max Rate is 7-BPM - (No significant amount of time to be spent outside of+/-0.2ppg Density Range) - Max Shut down time is 20-minutes;if time is being approached,contact Town Engineer - Max displacement Rate is 7-BPM - Min Displacement Rate to be determined based on remaining Thickening Time from field blend testing - Mud to be thinned back prior to cementing - Maintain returns during cement job if possible - Attempt to follow highlighted flow rates as close as possible and within ranges specified a Please note variance from noted Rates in Job Report Pumping Schedule Name Flow Volume Stage Time Cum.Vol 14 Comments Rate (bbl) (min) (bbl). Temp. (bblmi (degF) n) MUDPUSH II 5.00 100.0 20.0 100.0 80 Spacer ahead with rig pumps Pause 0.00 0.0 2.0 0.0 80 Drop bottom plug Pause 0.00 0.0 3.0 0.0 80 Line up cement unit Surface Lead 5.00 435.6 87.1 435.6 80 Mix/pump lead slurry(2-7 bpm) Pause 0.00 0.0 5.0 0.0 80 Swap to tail cement 12.5ppg DeepCRETE 5.00 63.0 12.6 63.0 80 Mix/pump tail slurry(2-7 bpm) Surface Tail Pause 0.00 0.0 5.0 0.0 80 Drop top plug Fresh H2O 5.00 10.0 2.0 10.0 80 Kick out plug with cement unit Pause 0.00 0.0 5.0 0.0 80 Swap to rig for displacement Mud 7.00 384.9 55.0 384.9 80 Displacement Mud 2.00 10.0 5.0 394.9 80 Slow to bump plug Total 03:21 1003.5 bbl hr:mn Dynamic Security Checks: Frac 3 psi at 160.0 ft Pore 9 psi at 160.0 ft Collapse 2005 psi at 2704.0 ft Burst 4742 psi at 0.0 ft Temperature Results BHCT 65 degF Simulated Max HCT 78 degF Simulated BHCT 77 degF Max HCT Depth 2784.0 ft CT at TOC 72 degF Max HCT Time 01:30:34 hr:mn:sc Static temperatures: At Time (hr:mn) 1 (hr:mn) 1 Geo.Temp. Top of Cement (degF) (degF) 20 degF Bottom Hole (degF) (degF) 50 degF Page 7 SP28-NW3 cemcade v17.28.15.dw;07-28-2015; LoadCase Surface 133/8;Version wcs-cem47602 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Simulated ECDs at Casing Shoe during Placement o Deepth= 2784 ft c6 Dynamic Frac Pore } NOMNI••••••••••..Hydrostatic I l of 1 i + •1leg �.. SEMI . 4 1 iiliiiiiilli .. . aii i M ;__ -. b_ 4,- , 1 iiiip __, ..7 = .J ..:, a _ 4 !agglis..zsat''-uisri,.....74,t4._.„4._L.1-' : ' _ :F± o -_,: of 1 M_ .' _..... , i—, . _ T_ lam_cri ' 1 p_.; i-- # _ -j 1 .t_. _ m 4. -t---.- .... _.__. . - ._ ,— al Jc 1 a0 --T--T--T-- I --T--T--T--T--T--T--� 0 20 40 60 80 100 120 140 160 180 200 220 Time(min) Page 8 SP28-NW3 cemcade v1728.15.cfw;07-28.2015; LoadCase Surface 133/8;Version wcs-cem476_02 0 Client : Eni Petroleum Well : SP28-NW3 Schlemberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Simulated ECDs at Previous shoe during Placement Dpth= 160 ft — T -Frac N -Pore -Fydrostatic 0 v o . goI _. jai II■ a)co. I t_I a. # ' -'1.--17 { { r V I _ CO Ii -- d i t 1 .i ; .'i S I l t i i 3 .i 1 i 4 1 3 3 Si 4 MI 3 - ---T--T--T--T--T--T--T--T--1---T--� 0 20 40 60 80 100 120 140 160 180 200 220 Time(min) Page 9 SP28-NW3 cemcade v1728.15.cfw;07-28-2015; LoadCase Surface 133/8;Version wcs-cem476_02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Simulated Surface Pressures during Placement 0 Calc.CemFP Calc.i d Press. Ac quired sure O O c M fl. N co N I o_ 'E O co N O 0 20 40 60 80 100 120 140 160 180 200 220 Time(min) Page 10 SP28-NW3 cemcade v17.28.15.crw;07-28-2015; LoadCase Surface 133/8;Version wcs-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Simulated Slurry Temperatures during Placement ft o— op 7o Last Sack Tenp. ,_First Sack Terrp. co 1/4."'''''."*%.'''s''N\NN- 1 o O— LL N L N O X O N r.-1" U C a E N O N in _ a O O to N cn co NN.....NN 11 O O O CO— (O _--T_--T__—T—__T—_—T—__T___ r 0 250 500 750 1000 1250 1500 1750 Time(min) Page 11 SP28-NW3 cemcade v17.28.15.cfw;07-28.2015; LoadCase Surface 133/8;Version wcs-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger �(j�merger String : 133/8 District : Prudhoe Bay 1Y! Country : USA Loadcase : Surface 133/8 Contingencies Any issue that occurs during cement mixing,pumping,and displacement must be approached in a step by step method.Anytime a stoppage in the job occurs it must be noted how much time can be allotted to fix any issue and calculate time remaining based off of Field Blend Testing. 1) If Losses prior to cementing a) Utilize CemNET(1-2 lb/bbl;2 lb MAX) b) Attempt to establish Max Rate at which full circulation is achieved c) Pump job at this rate if possible 2) Cement unit failure while mixing a) Attempt to continue pumping cement at 0.5 bpm b) Attempt to remedy issue:time<20 min c) If issue with mixing system—switch to back-up mixing system d) If issue with tri-plex pump—Cont.job with secondary tri-plex pump on unit. 3) Top Plug is not Bumped at calculated Volume a) Pump h shoe track volume MAX b) If Bump not seen,shut in and hold pressure 4) Mud Pump failure during displacement a) Attempt to continue displacement with secondary pump b) Attempt to repair issue:time<10 min c) Note displacement volume pumped by mud pumps:verify with Co.Rep/WSL d) Subtract pumped volume from total volume=volume pumped by Cement Unit e) Rig up hoses to get mud to Cement Unit i) Begin displacement with Cement Unit:volume verified by Co.Rep/WSL Page 12 SP20-MN3 cemcade N 7.28.15.cfw;07-213-2015;LoadCase Surface 13 3/a;Version wcs-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 Schluulbaler String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 4: fluid descriptions Mud DESIGN Fluid No:1 Density :9.50 lb/gal Rheo.Model :HERSCHEL_B. k :8.28E-2 Ibf.s^n/ft2 At temp. :65 degF n :0.262 Ty :0.48 lbf/100ft2 Gel Strength :6.40 lbf/100ft2 MUD Mud Type :WBM Job volume :394.9 bbl Water Type :Fresh VOLUME FRACTION Solids :4.0% Oil :0.0% Water :96.0% Rheometric Measurements Rheometer type :35 (rpm) At 65 degF Geometry :R1B1 (deg) Spring No :1.0 300 42.0 200 38.0 100 31.0 60 28.0 30 24.0 6 16.0 3 13.0 I Viscosity:(cP) 10 sec Gel Strength 8.54 lbf/100ft2 10 min Gel Strength 6.40 lbf/100ft2 Page 13 SP28-NW3 cemcade N 7.28.15.cfw;07-28-2015; LoadCase Surface 13 3/8;Version wcs-cem476 02 • Client : Eni Petroleum Well : SP28-NW3 S hiu mberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 MUDPUSH II DESIGN Fluid No:2 Density :10.10 lb/gal Rheo.Model :HERSCHEL_B. k :2.54E-2 Ibf.s^n/ft2 At temp. :65 degF n :0.420 Tr :13.04 lbf/100ft2 Gel Strength :(Ibf/100ft2) SPACER Spacer Type:MUDPUSH II Porosity :92.5% Solid Fraction :7.5% Mud Type :WBM Mix Water/Spacer(vol.): 92.0% Job volume :100.0 bbl BASE FLUID Type :Fresh water Density :8.32 lb/gal Weighting Agent(s) Code Conc. Density D031 95.37 lb/bbl of spacer 270.31 lb/ft3 0) (Ib/ft3) Additives Code Conc. Function D182 6.000 lb/bbl of base fluid Turb.Spacer D047 0.200 gaUbbl of spacer Antifoam Rheometric Measurements Rheometer type :35 (rpm) At 65 degF Geometry :R1 B1 (deg) Spring No :1.0 300 47.0 200 41.0 100 34.0 60 31.0 30 27.0 6 19.5 3 17.0 I Viscosity:(cP) 10 sec Gel Strength (Ibf/100ft2) 10 min Gel Strength (Ibf/100ft2) Page 14 SP28-NW3 cemcade v1728.15.cfw•07-28-2015; LoadCase Surface 133/8;Version wce-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 S hlumburger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 12.5ppg DeepCRETE Surface Tail DESIGN Fluid No:4 Density :12.50 lb/gal Rheo.Model :HERSCHEL_B. k :1.68E-1 Ibf.s^n/ft2 At temp. :74 degF n :0.301 Ty :0.44 lbf/100ft2 Gel Strength :(Ibf/100ft2) DESIGN BLEND SLURRY Name :12.5-0.82-53 Mix Fluid :5.471 gal/sk Job volume :63.0 bbl Dry Density :121.24 lb/ft3 Yield :1.56 ft3/sk Quantity :226.21 sk Sack Weight:100 lb Solid Fraction :53.3% BASE FLUID Type :Fresh water Density :8.32 lb/gal Base Fluid :5.471 gal/sk Additives Code Conc. Function D046 0.200%BWOB Antifoam D065 0.250%BWOB Dispersant D167 0.250%BWOB Fluid loss D153 0.100%BWOB Antisettling Rheometric Measurements Rheometer type :35 (rpm) At 74 degF Geometry :R1 B5 (deg) Spring No :1.0 300 83.0 200 69.0 100 56.5 60 53.5 30 52.5 6 31.1 3 24.6 I Viscosity:(cP) 10 sec Gel Strength 27.32 Ibf/100ft2 10 min Gel Strength 43.59 Ibf/100ft2 Page 15 SP28-NW3 cemcade 1 7.28.15.cfw;07-28-2015; LoadCase Surface 13 3/B,Version wcs-cem476_02 • i Client : Eni Petroleum Well : SP28-NW3 Schlumbcrgcr String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Fresh H2O DESIGN Fluid No:5 Density :8.34 lb/gal Rheo.Model :NEWTONIAN At temp. :80 degF Viscosity :5.375 cP Gel Strength :3.20 Ibf/100ft2 WASH Wash Type :Water Water/Wash(vol.):100.0% Job volume:10.0 bbl Mud Type :WBM BASE FLUID Type :Fresh H2O Density :8.34 lb/gal Page 16 SP28-NW3 cemcade N 728.15.cfw;07-28-2015;LosdCase Surface 133/8;Version wcs-cee47602 I • Client : Eni Petroleum Well : SP28-NW3 Schlumherger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Surface Lead DESIGN Fluid No:6 Density :10.70 lb/gal Rheo.Model :HERSCHEL_B. k :1.46E-1 Ibf.s"n/ft2 At temp. :69 degF n :0.350 Tr :1.41 lbf/100ft2 Gel Strength :14.25 Ibf/100ft2 DESIGN BLEND SLURRY Name :BLD_ASL B439 Mix Fluid :13.506 gal/sk Job volume :435.6 bbl Dry Density :106.08 lb/ft3 Yield :2.77 ft3/sk Quantity :883.60 sk Sack Weight :100 lb Solid Fraction :34.8% BASE FLUID Type :Fresh water Density :8.33 lb/gal Base Fluid :13.135 gal/sk Additives Code Conc. Function D046 0.400%BWOB Antifoam D065 0.500%BWOB Dispersant D079 0.500%BWOB Extender S002 0.900%BWOB Accelerator D044 9.000%BWOW Salt Rheometric Measurements Rheometer type :35 (rpm) At 69 degF Geometry :R1 B5 (deg) Spring No :1.0 300 95.0 200 79.5 100 67.0 60 58.5 30 43.0 6 20.0 3 12.5 I Viscosity:(cP) 10 sec Gel Strength 15.4.4 Ibf/100ft2 10 min Gel Strength 14.25 lbf/100ft2 Page 17 SP28.NW3 cemcade v1 7.28.15.cfw;07-28-2015; LoadCase Surface 13 3/13;Version wcs-cem476_02 • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 5: centralizer placement Top of centralization :0.0 ft Bottom Cent.MD :2774.0 ft Casing Shoe :2784.0 ft NB of Cent.Used :15 NB of Floating Cent. :1 Centralizer Placement Bottom MD Nbr. Cent./ Cent.Name Code Min.STO @ Depth (ft) Joint (%) (ft) 104.0 0 0/0 100.0 62.0 184.0 2 1/1 NW-ST-13 3/8-8-ST A3B W131 0.0 178.8 2304.0 0 0/0 0.0 184.0 2744.0 11 1/1 NW-ST-13 3/8-8-ST A3B W131 0.0 2312.6 2784.0 2 2/1 NW-ST-13 3/8-8-ST A3B W131 89.6 2754.0 Centralizer Description Centralizer Tests Cent.Name Code Casing Max. Min.OD Rigid Origin Hole Size Running Restoring OD OD (in) (in) Force Force (in) (in) (Ibf) (Ibf) MN-ST-13 3/8-8-ST W131 13 3/8 18.386 14.685 No Hannover 16.000 1225.21 2996.70 A3B ft �r9 0 I "0 60 80 100 Pipe Standoff Page 18 SP28-NW3=cede s17.2B.15.cfw;07-282015; LoadCase Surface 133/8;Version wcs-cem476 02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Section 6: WELLCLEAN II Simulator ft o 0 25 50 75 100 0 25 50 75 100 Std Betw.Cent. —Mud Contamination —Cement Coverage —Uncontaminated Slurry 0 0' — N — Cement Coverage Uncontaminated Slurry Page 19 SP28-MN3 cemcade v17.28.15.ctw;07-28-2015; LoadCase Surface 133/8;Version wcs-cem476_02 • • Client : Eni Petroleum Well : SP28-NW3 Schlumberger String : 133/8 District : Prudhoe Bay Country : USA Loadcase : Surface 133/8 Risk Mud on the Wall Fluids Concentrations a 3 4 s° 4 0 0 0-, -0 500 500 50D- -500 IMO 1000r, 1 Goo— —1000,.,. L I u L S 150G i 1500 n 5 1 MG— —1500 S a s a a 2000 2000 2000- -2000 2500 2500 2500- -2500 1 3 3 33 2 2 L-_1 High Lova 11111 Mud I I Medium I I None 111111 Fresh H2O Eai 12.5ppg DeepCRETE Surface Tail I I Surface Lead ® MUDPUSHII Page 20 SP28-NW3 cemcade N 7.28.15.crw;87-28-2815; LoadCase Surface 13 3/a;Version wcs-cem476_82 • • Schlumberger CemCAD E*well cementing recommendation for 9 5/8 Intermediate Casing Operator : Eni Petroleum Well SP21-NW1 Country : USA Field : Spy Island State : Alaska Prepared for :Andrea Lazzari Location : Spy Island Proposal No. : Initial Service Point : Prudhoe Bay,AK Date Prepared : 7.28.15 Business Phone : 907.659.2434 Prepared by : Jenna Houston Phone : 907.223-8916 E-Mail Address : jhouston2@slb.com n 1L VATS Disclaimer Notice: SMlumb/arser submits this document with Me benefit of its judgment,experience,end pond oiniea practices_ this information is provided in accordance with generally wagged Mushy practice.relying on facts or information provided by others.limfledans.wmgrter modals.measuemurts,assumptions erd'infaremas that are cot idaRible. Calculations era estimates based en provided information.All proposals,recommendations,or predictions are opinions only. NO WARRANTY IS GIVEN CONCERNING ACCURACY OR COMPLETENESS OF DATA,INFORMATION PRESENTED.EFFECTIVENESS OF MATERIAL PRODUCTS OR SUPPLIES.RECOMMENDATIONS MADE,OR RESULTS OF TLE SERVICES RENDERED. Freedom from infringement of any intellectual property rights of Schlunbsrpar or others is not to be Warned mrd no iaellectuel property rights are gaited hereby. •Mark of Schlumberger Page 1 SP28-NW3 cemcade v17.28.15.cfw:07-28-2015: LoadCase Intermediate Casing 95/8:Version wcscem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Section 1 : well description Configuration :Casing Stage :Single Rig Type :Land Mud Line :0.0 ft Total MD :16410.0 ft BHST :85 degF Bit Size :12 1/4 in ft ix 1000?psi _ _ 0 2.5 i NEB '.'.':Sandstone'.'.'.' . CJ_ Well Litholo Formation Press. Page 2 SP28-NW3 cemcade v17.28.15.cfw;07-28-2015, LoadCase Intermediate Casing 95/8;Version wcscem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Previous String MD OD Weight ID (ft) (in) (Ib/ft) (in) 2784.0 13 3/8 68.0 12.415 Landing Collar MD :16330.0 ft Casing/liner Shoe MD :16410.0 ft Casing/Liner MD OD Joint Weight ID Grade Collapse Burst Thread (ft) (in) (ft) (lb/ft) (in) (psi) (psi) 16410.0 9 5/8 40.0 40.0 8.835 L-80 3090 5750 BTC Page 3 SP28-NW3 cemcade v17.28.15.cfw;07-28-2015; 1oadCase Intermediate Casing 95/8;Version wcs.cem476_02 • • Client : Eni Petroleum Well : SP21-NWI Schlullib ei String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Mean OH Diameter :12.250 in Mean Annular Excess :50.0% Mean OH Equivalent Diameter:13.371 in Total OH Volume :2366.4 bbl (including excess) Max.Deviation Angle :88 deg Max.DLS :3.757 deg/100ft Directional Survey Data MD TVD Deviation Azimuth Dogleg Sev. (ft) (ft) (deg) (deg) (deg/100ft) 0.0 0.0 0.0 297.0 0.000 100.0 100.0 0.0 297.0 0.000 200.0 200.0 0.0 297.0 0.000 300.0 300.0 0.0 297.0 0.000 400.0 400.0 1.0 297.0 1.000 500.0 499.9 3.0 297.0 2.000 600.0 599.6 5.8 297.0 2.750 700.0 698.8 8.5 297.0 2.750 763.3 761.3 10.2 297.0 2.747 800.0 797.4 11.3 297.0 2.756 900.0 894.9 14.0 297.0 2.750 1000.0 991.3 16.8 297.0 2.750 1100.0 1086.4 19.5 297.0 2.750 1119.1 1104.4 20.0 297.0 2.771 1200.0 1179.8 22.3 297.0 2.745 1300.0 1271.4 25.0 297.0 2.750 1392.2 1354.1 27.5 297.0 2.754 1393.7 1355.4 27.5 297.0 0.000 1400.0 1361.0 27.6 297.0 0.495 1500.0 1449.4 28.1 296.7 0.507 1600.0 1537.5 28.5 296.4 0.496 1700.0 1625.1 29.0 296.2 0.506 1800.0 1712.4 29.5 295.9 0.495 1859.5 1764.1 29.8 295.8 0.503 1900.0 1799.2 30.0 295.7 0.506 1963.5 1854.1 30.3 295.5 0.487 2000.0 1885.4 31.4 294.9 3.023 2050.8 1928.5 32.8 294.0 2.987 2100.0 1969.5 34.2 293.3 3.006 2200.0 2050.7 37.1 291.9 3.000 2300.0 2128.9 40.0 290.7 2.996 2363.5 2176.9 41.9 290.0 2.999 2400.0 2203.8 43.0 290.3 3.254 2451.0 2240.6 44.7 290.7 3.261 2500.0 2275.0 46.2 291.1 3.250 2600.0 2342.1 49.5 291.8 3.249 2700.0 2404.9 52.7 292.4 3.247 2783.7 2454.1 55.3 292.9 3.248 2800.0 2463.3 55.9 293.0 3.277 2900.0 2517.1 59.1 293.5 3.251 3000.0 2566.0 62.3 294.0 3.248 3100.0 2609.9 65.5 294.5 3.248 3163.5 2635.2 67.6 294.7 3.253 3200.0 2648.8 68.7 293.8 3.757 3300.0 2682.7 71.6 291.4 3.742 3400.0 2711.7 74.7 289.0 3.757 3444.1 2722.9 76.0 288.0 3.741 3500.0 2735.6 77.7 286.8 3.751 Page 4 SP28-NW3 cemcade 07.28.15.dw;07-28-2015, LoadCase Intermediate Casing 95/8;Version ww-cem476_02 • . Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Directional Survey Data MD TVD Deviation Azimuth Dogleg Sev. (ft) (ft) (deg) (deg) (deg/100ft) 3600.0 2754.3 80.7 284.5 3.747 3700.0 2767.8 83.8 282.4 3.751 3800.0 2776.0 86.8 280.2 3.749 3837.3 2777.7 88.0 279.4 3.755 3900.0 2779.9 88.0 279.4 0.000 4000.0 2783.4 88.0 279.4 0.000 4100.0 2786.8 88.0 279.4 0.000 4200.0 2790.3 88.0 279.4 0.000 4300.0 2793.8 88.0 279.4 0.000 4400.0 2797.3 88.0 279.4 0.000 4500.0 2800.8 88.0 279.4 0.000 4600.0 2804.3 88.0 279.4 0.000 4700.0 2807.8 88.0 279.4 0.000 4800.0 2811.3 88.0 279.4 0.000 4900.0 2814.8 88.0 279.4 0.000 5000.0 2818.2 88.0 279.4 0.000 5100.0 2821.7 88.0 279.4 0.000 5200.0 2825.2 88.0 279.4 0.000 5300.0 2828.7 88.0 279.4 0.000 5400.0 2832.2 88.0 279.4 0.000 5500.0 2835.7 88.0 279.4 0.000 5600.0 2839.2 88.0 279.4 0.000 5700.0 2842.7 88.0 279.4 0.000 5800.0 2846.2 88.0 279.4 0.000 5900.0 2849.7 88.0 279.4 0.000 6000.0 2853.1 88.0 279.4 0.000 6100.0 2856.6 88.0 279.4 0.000 6200.0 2860.1 88.0 279.4 0.000 6300.0 2863.6 88.0 279.4 0.000 6400.0 2867.1 88.0 279.4 0.000 6500.0 2870.6 88.0 279.4 0.000 6600.0 2874.1 88.0 279.4 0.000 6700.0 2877.6 88.0 279.4 0.000 6800.0 2881.1 88.0 279.4 0.000 6900.0 2884.6 88.0 279.4 0.000 7000.0 2888.0 88.0 279.4 0.000 7100.0 2891.5 88.0 279.4 0.000 7200.0 2895.0 88.0 279.4 0.000 7300.0 2898.5 88.0 279.4 0.000 7400.0 2902.0 88.0 279.4 0.000 7500.0 2905.5 88.0 279.4 0.000 7600.0 2909.0 88.0 279.4 0.000 7700.0 2912.5 88.0 279.4 0.000 7800.0 2916.0 88.0 279.4 0.000 7900.0 2919.5 88.0 279.4 0.000 8000.0 2922.9 88.0 279.4 0.000 8100.0 2926.4 88.0 279.4 0.000 8200M 2929.9 88.0 279.4 0.000 8300.0 2933.4 88.0 279.4 0.000 8400.0 2936.9 88.0 279.4 0.000 8500.0 2940.4 88.0 279.4 0.000 8600.0 2943.9 88.0 279.4 0.000 8700.0 2947.4 88.0 279.4 0.000 8800.0 2950.9 88.0 279.4 0.000 8900.0 2954.4 88.0 279.4 0.000 9000.0 2957.8 88.0 279.4 0.000 9100.0 2961.3 88.0 279.4 0.000 Page 5 SP28-NW3 cemade 07.28.15.dw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wwcem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Directional Survey Data MD TVD Deviation Azimuth Dogleg Sev. (ft) (ft) (deg) (deg) (deg/100ft) 9200.0 2964.8 88.0 279.4 0.000 9300.0 2968.3 88.0 279.4 0.000 9400.0 2971.8 88.0 279.4 0.000 9500.0 2975.3 88.0 279.4 0.000 9600.0 2978.8 88.0 279.4 0.000 9700.0 2982.3 88.0 279.4 0.000 9800.0 2985.8 88.0 279.4 0.000 9900.0 2989.3 88.0 279.4 0.000 10000.0 2992.7 88.0 279.4 0.000 10100.0 2996.2 88.0 279.4 0.000 10200.0 2999.7 88.0 279.4 0.000 10300.0 3003.2 88.0 279.4 0.000 10400.0 3006.7 88.0 279.4 0.000 10500.0 3010.2 88.0 279.4 0.000 10600.0 3013.7 88.0 279.4 0.000 10700.0 3017.2 88.0 279.4 0.000 10800.0 3020.7 88.0 279.4 0.000 10900.0 3024.2 88.0 279.4 0.000 11000.0 3027.6 88.0 279.4 0.000 11100.0 3031.1 88.0 279.4 0.000 11200.0 3034.6 88.0 279.4 0.000 11300.0 3038.1 88.0 279.4 0.000 11400.0 3041.6 88.0 279.4 0.000 11500.0 3045.1 88.0 279.4 0.000 11600.0 3048.6 88.0 279.4 0.000 11700.0 3052.1 88.0 279.4 0.000 11800.0 3055.6 88.0 279.4 0.000 11900.0 3059.1 88.0 279.4 0.000 12000.0 3062.5 88.0 279.4 0.000 12100.0 3066.0 88.0 279.4 0.000 12200.0 3069.5 88.0 279.4 0.000 12300.0 3073,0 88.0 279.4 0.000 12400.0 3076.5 88.0 279.4 0.000 12500.0 3080.0 88.0 279.4 0.000 12600.0 3083.5 88.0 279.4 0.000 12637.3 3084.8 88.0 279.4 0.000 12700.0 3087.7 86.8 279.5 -1.999 12800.0 3095.1 84.8 279.6 -2.006 12900.0 3105.9 82.8 279.8 -1.996 13000.0 3120.3 80.8 279.9 -1.996 13096.5 3137.3 78.8 280.1 -2.006 13100.0 3138.0 78.8 280.1 0.000 13200.0 3157.4 78.8 280.1 0.000 13300.0 3176.7 78.8 280.1 0.000 13400.0 3196.1 78.8 280.1 0.000 13500.0 3215.4 78.8 280.1 0.000 13594.0 3233.6 78.8 280.1 0.000 13600.0 3234.8 78.8 280.1 0.000 13700.0 3254.2 78.8 280.1 0.000 13800.0 3273.5 78.8 280.1 0.000 13900.0 3292.9 78.8 280.1 0.000 14000.0 3312.2 78.8 280.1 0.000 14100.0 3331.6 78.8 280.1 0.000 14200.0 3350.9 78.8 280.1 0.000 14300.0 3370.3 78.8 280.1 0.000 14400.0 3389.6 78.8 280.1 0.000 14500.0 3409.0 78.8 280.1 0.000 Page 6 SP28-NW3 cemcade vl 7.28.15.cfw:07-28-2015: LoadCase Intermediate Casing 95/8;Version wrs.cem478_02 • o Client : Eni Petroleum Well : SP21-NW1 Stihl merger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK (1 �j Country : USA Loadcase : Intermediate Casing 9 5/8 Directional Survey Data MD TVD Deviation Azimuth Dogleg Sev. (ft) (ft) (deg) (deg) (deg/100ft) 14533.4 3415.5 78.8 280.1 0.000 14568.9 3422.3 78.8 280.1 0.000 14579.9 3424.5 78.9 280.4 2.998 14600.0 3428.3 79.0 281.0 3.006 14700.0 3446.7 79.7 284.0 3.002 14800.0 3464.0 80.4 287.0 3.003 14844.7 3471.4 80.7 288.3 2.997 14883.9 3477.6 81.0 289.4 2.981 14900.0 3480.1 81.1 289.9 3.034 15000.0 3495.0 81.8 292.9 2.998 15100.0 3508.6 82.6 295.8 2.998 15200.0 3520.8 83.3 298.7 2.998 15208.0 3521.8 83.4 299.0 3.061 15300.0 3531.8 84.1 301.6 3.004 15400.0 3541.3 84.9 304.5 2.996 15500.0 3549.4 85.8 307.4 3.004 15600.0 3556.1 86.6 310.3 3.001 15700.0 3561.4 87.4 313.2 2.993 15710.3 3561.8 87.5 313.5 3.026 15800.0 3565.7 87.5 313.5 0.000 15900.0 3570.1 87.5 313.5 0.000 16000.0 3574.4 87.5 313.5 0.000 16100.0 3578.8 87.5 313.5 0.000 16200.0 3583.2 87.5 313.5 0.000 16295.9 3587.4 87.5 313.5 0.000 16300.0 3587.5 87.5 313.5 0.000 16400.0 3591.9 87.5 313.5 0.000 16410.0 3592.3 87.5 313.5 0.000 Formation Data MD Frac. Pore Name Lithology (ft) (lb/gal) (lb/gal) 763.0 11.50 8.40 SV-4 Siltstone 1119.0 11.50 8.40 SV-3 Sandstone 1394.0 11.50 8.40 SV-2 Siltstone 1860.0 11.50 8.40 B/Permafrost Shale 3444.0 12.50 8.40 UG-2 Coal Bed Coal 13594.0 12.50 8.40 Lower Ugnu Shale 14533.0 12.50 8.40 Schrader Bluff Top Shale 14845.0 12.50 8.40 N Top Sandstone 14883.0 12.50 8.40 N Bottom Sandstone 16410.0 12.50 8.40 9 5/8 TD Sandstone Page 7 SP213-NW3 cemcade v17.29.15.cfw;07-2e-2015; LoadCase Intermediate Casing 95/9;Versionvrs-cem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Geothermal Temperature Profile MD TVD Temperature Gradient (ft) (ft) (degF) (degF/100ft) 0.0 0.0 20 0.0 1860.0 1764.5 32 0.7 2874.0 2503.5 50 1.2 16410.0 3592.3 85 1.8 ft degF (x 1000)ft _ 0 60 90 n Fi 10 _: : —Hari.Czn I I o — co CV . TI O CV "— x x CV [V CV St'7 SD Temperature Hori. Departure Page 8 SP28-NW3 cemcade v1728.15.dw;07-28.2015; LoadGase Intermediate Casing 95/0;Version wra-nem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Section 2: fluid sequence Job Objectives: Zonal Isolation,TOC @ 12,737'(1,000'above the"N" Sand Top) Original fluid Mud 9.50 lb/gal k:5.97E-3 Ibf.s^n/ft2 n:0.616 TY:8.86 Ibf/100ft2 Displacement Volume 1238.3 bbl Total Volume 1558.9 bbl TOC 13845.0 ft Fluid Sequence Name Volume Ann.Len Top Density Rheology (bbl) (ft) (ft) (lb/gal) MUDPUSH II 100.0 1195.1 12649.9 10.00 k:2.68E-2 Ibf.s"n/ft2 n:0.396 Ty:13.18 Ibf/100ft2 12.5ppg DeepCRETE 172.8 2065.0 13845.0 12.50 k:4.89E-3 Ibf.s"n/ft2 n:0.960 Ty:15.95 lbf/100ft2 15.8 ppg Tail 47.9 500.0 15910.0 15.80 k:1.19E-2 Ibf.s^n/ft2 n:0.789 Ty:0.02 Ibf/100ft2 Fresh H2O 5.0 16264.1 8.32 k:5.23E-3 Ibf.s"n/ft2 n:0.291 Ty:1.04 Ibf/100ft2 Mud 1233.3 0.0 9.50 k:5.97E-3lbf.s"n/ft2 n:0.616 Ty:8.86lbf/100ft2 Static Security Checks: Frac 357 psi at 2784.0 ft Pore 140 psi at 2784.0 ft Collapse 2888 psi at 16330.0 ft Burst 5750 psi at 0.0 ft Csg.Pump out 60 ton Check Valve Diff Press 56 psi ft +,;x 11700; psi 0 sara[_ -G3D r _ Fluid Sequence Static Well Securit,, Page 9 SP28-NW3 cemcade v17.28.15.dw;07-28.2015; LoedCase Intermediate Casing 95/8;Version wcs-cem47602 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Section 3: pumping schedule - Spacer/Cement Max Rate is 7-BPM - (No significant amount of time to be spent outside of+/-0.2ppg Density Range) - Max Shut down time is 20-minutes;if time is being approached,contact Town Engineer - Max displacement Rate is 7-BPM - Min Displacement Rate to be determined based on remaining Thickening Time from field blend testing - Mud to be thinned back prior to cementing - Maintain returns during cement job if possible - Attempt to follow highlighted flow rates as close as possible and within ranges specified o Please note variance from noted Rates in Job Report Pumping Schedule Name Flow Rate Volume Stage Time Cum.Vol Inj. Comments (bbl/min) (bbl) (min) (bbl). Temp. (degF) MUDPUSH II 5.00 100.0 20.0 100.0 80 Spacer Ahead with Rig Pumps Pause 0.00 0.0 2.0 0.0 80 Drop Bottom Plug Pause 0.00 0.0 3.0 0.0 80 Line up Cement Unit 12.5ppg 5.00 172.8 34.6 172.8 80 Mix/Pump Lead SLuny(3-7 BPM) DeepCRETE Pause 0.00 0.0 5.0 0.0 80 Swap to Tail Cement 15.8 ppg Tail 5.00 47.9 9.6 47.9 80 Mix/Pump Tail Slurry(2-6 BPM) Pause 0.00 0.0 5.0 0.0 80 Drop Top Plug Fresh H2O 5.00 5.0 1.0 5.0 80 Kick Out Plug with Cement Unit Pause 0.00 0.0 5.0 0.0 80 Swap to Rig for Displacement Mud 7.00 1223.3 174.8 1223.3 80 Start Displacement Mud 2.00 10.0 5.0 1233.3 80 Slow to bump plug Shut-In 0.00 0.0 1440.0 0.0 80 Bleed Off&Check Floats Total 04:24 1558.9 bbl hr:mn Dynamic Security Checks: Frac 133 psi at 16410.0 ft Pore 140 psi at 2784.0 ft Collapse 2632 psi at 169.5 ft Burst 5238 psi at 0.0 ft Temperature Results BHCT 83 degF Simulated Max HCT 75 degF Simulated BHCT 74 degF Max HCT Depth 15405.3 ft CT at TOC 74 degF Max HCT Time 04:24:52 hr:mn:sc Static temperatures: At Time 12:00 hr.mn 24:00 hr:mn Geo.Temp. Top of Cement 75 degF 75 degF 75 degF Bottom Hole 81 degF 84 degF 85 degF Page 10 SP28-NW3 cemcade v1 7.28.15.cfw;07-28-2015: LoadCase Intermediate Casing 95/8;Version wcs-cem47t_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Simulated ECDs at Casing Shoe during Placement o Depth=16410 ft _—_ o'i Dynamc --� Frac L_—Pore (Ni ---•Ffydrostatic I I to 1 1 .............y.-1 1 3.w10 1! t o_0 1 i r +-- , --r---{ .�irommearrials �I 0 1 —r� t� 1 I i _ _ o I i _ II {- 1 .; ..Y,-i--- _ern t. cci I Q I 0_ _________,_______ __________ ____r_______ —'T---_I 0 40 80 120 160 200 240 280 Time(min) Page 11 SP2B-NW3 cemcade 07.26.15.cfw;t7-28-2015; LoadCase Intermediate Casing 95/6;Version wcs-cem476_02 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Simulated ECDs at Previous shoe during Placement Depth= 2784 ft cki I Dynamic 1. ........... Frac 0 Fore CNI ---I-ydrostatc off �� 1 Lo I a3 o = I _ J V\,7') Y V/) = Qrn I of oil ao oIf T--T--T--T--T--T--T--�l 0 40 80 120 160 200 240 280 Time(min) Page 12 SP28-NW3 cemcade 07.28.15.cfw.07-28-2015; Lo dC,ase Intermediate Casing 95/8;Version wcs-cem476_02 • s Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Simulated Surface Pressures during Placement —Ca .Cen1FP —Ca Purrp Press. -Accu d Pressure d J � o --------__7 oo� 0 aaD N o co .1:1,...... '------,,Yr- 0"] ❑ 4_ / O --T -T--T--T--T--� 0 40 80 120 160 200 240 280 Time(min) Page 13 SP28-NW3 cemcade 07.28.15.dw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wcs-cem476_02 • s Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Simulated Slurry Temperatures ft o- to -- —�O esi Last Sack Temp. —First Sack Temp. O 01 a0 7 1LL P CV O� I O 481 0 0 o 0-7, a1c, Z a I I_it) I I tNiI a I O ,o N— O T—T—T—T LH I n 0 300 600 900 1200 1500 1800 Time(min) Page 14 SP28-NW3 commie v17.28.15.cfw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wu-cem476_02 I 11111 Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Schlumberger U Country : USA Loadcase : Intermediate Casing 95/8 Contingencies Any issue that occurs during cement mixing,pumping,and displacement must be approached in a step by step method.Anytime a stoppage in the job occurs it must be noted how much time can be allotted to fix any issue and calculate time remaining based off of Field Blend Testing. 1) If Losses prior to cementing a) Utilize CemNET(1-2 Ib/bbl;2 lb MAX) b) Attempt to establish Max Rate at which full circulation is achieved c) Pump job at this rate if possible 2) Cement unit failure while mixing a) Attempt to continue pumping cement at 0.5 bpm b) Attempt to remedy issue:time<20 min c) If issue with mixing system—switch to back-up mixing system d) If issue with tri-plex pump—Cont.job with secondary tri-plex pump on unit. 3) Top Plug is not Bumped at calculated Volume a) Pump Y2 shoe track volume MAX b) If Bump not seen,shut in and hold pressure 4) Mud Pump failure during displacement a) Attempt to continue displacement with secondary pump b) Attempt to repair issue:time<10 min c) Note displacement volume pumped by mud pumps:verify with Co.Rep/WSL d) Subtract pumped volume from total volume=volume pumped by Cement Unit e) Rig up hoses to get mud to Cement Unit i) Begin displacement with Cement Unit:volume verified by Co.Rep/WSL Page 15 SP20-NW3 Germsde v17.29.15.cfw;07-28-2015, LoadCase Intermediate Casing 95/8;Version wcs-cem470_02 • Client : Eni Petroleum Well : SP21-NW1 SCMUMbenget� String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK U !{� �j Country : USA Loadcase : Intermediate Casing 95/8 Section 4: fluid descriptions Mud DESIGN Fluid No:1 Density :9.50 lb/gal Rheo.Model :HERSCHEL_B. k :5.97E-3 Ibf.s^n/ft2 At temp. :80 degF n :0.616 Tr :8.86 lbf/100ft2 Gel Strength :32.02 Ibf/100ft2 MUD Mud Type :WBM Job volume :1233.3 bbl Water Type :Fresh VOLUME FRACTION Solids :4.0% Oil :0.0% Water :96.0% Rheometric Measurements Rheometer type :35 (rpm) At 80 degF Geometry :R1B1 (deg) Spring No :1.0 600 50.0 300 35.0 200 30.0 100 23.0 6 11.0 3 9.0 I Viscosity:(cP) 10 sec Gel Strength 17.08 Ibf/100ft2 10 min Gel Strength 32.02 lbf/100ft2 Page 16 SP28-NW3 cemcade v17.28.15.cfw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wcs-cem476_02 • S Client : Eni Petroleum Well : SP21-NW1 San'herger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 MUDPUSH II DESIGN Fluid No:2 Density :10.00 lb/gal Rheo.Model :HERSCHEL_B. k :2.68E-2 Ibf.s^n/ft2 At temp. :80 degF n :0.396 Ty :13.18 lbf/100ft2 Gel Strength :22.41 lbf/100ft2 SPACER Spacer Type:MUDPUSH II Porosity :92.9% Solid Fraction :7.1 % Mud Type :WBM Mix Water/Spacer(vol.): 92.4% Job volume : 100.0 bbl BASE FLUID Type :Fresh water Density ( :8.32 Ib/g; Weighting Agent(s) Code Conc. Density D031 89.90 lb/bbl of spacer 270.31 lb/ft3 0) (Ib/ft3) Additives Code Conc. Function D047 0.200 gal/bbl of spacer Antifoam D182 6.000 lb/bbl of base fluid Turb.Spacer Rheometric Measurements Rheometer type :35 (rpm) At 80 degF Geometry :R1 B1 (deg) Spring No :1.0 300 44.0 200 39.0 100 33.0 60 29.5 30 26.5 6 20.0 3 17.6 I Viscosity:(cP) 10 sec Gel Strength 20.28 Ibf/100ft2 10 min Gel Strength 22.41 Ibf/100ft2 Page 17 SP28-NW3 cemcade 07.28.15.cfw;07-28-2015, LoadCase Intermediate Casing 95/8;Version wcs-cem476_02 • S Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 12.5ppg DeepCRETE DESIGN Fluid No:3 Density :12.50 lb/gal Rheo.Model :HERSCHEL_B. k :4.89E-3 Ibf.s^n/ft2 At temp. :74 degF n :0.960 Ty :15.95 lbf/100ft2 Gel Strength :(Ibf/100ft2) DESIGN BLEND SLURRY Name :12.5-0.82-53 Mix Fluid :5.471 gal/sk Job volume :172.8 bbl Dry Density :121.24 lb/ft3 Yield :1.56 ft3/sk+ Quantity :619.96 sk Sack Weight:100 lb Solid Fraction :53.3% BASE FLUID Type :Fresh water Density :8.32 lb/gal Base Fluid :5.471 gal/sk Additives Code Conc. Function D046 0.200%BWOB Antifoam D065 0.250%BWOB Dispersant D167 0.250%BWOB Fluid loss D153 0.100%BWOB Antisettling Rheometric Measurements Rheometer type :35 (rpm) At 74 degF Geometry :R1B5 (deg) Spring No :1.0 300 100.0 200 73.0 100 44.5 60 33.5 30 25.0 6 17.2 3 13.0 I Viscosity:(cP) 10 sec Gel Strength 27.32 Ibf/100ft2 10 min Gel Strength 43.59 lbf/100ft2 Page 18 SP2B-NW3 cemcade v17.28.15.cfw;07.28-2015; LoadCase Intermediate Casing 95/8;Version v.os-cem476_02 • S Client : Eni Petroleum Well : SP21-NW1 Sohl mbarger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK !!1(� �j Country : USA Loadcase : Intermediate Casing 9 5/8 15.8 ppg Tail DESIGN Fluid No:4 Density :15.80 lb/gal Rheo.Model :HERSCHEL_B. k :1.19E-2 Ibf.sAn/ft2 At temp. :75 degF n :0.789 Tr :0.02 lbf/100ft2 Gel Strength :8.54 Ibf/100ft2 DESIGN BLEND SLURRY Name :G Mix Fluid :5.168 gal/sk Job volume :47.9 bbl Dry Density : 199.77 lb/ft3 Yield :1.16 ft3/sk Quantity :231.58 sk Sack Weight:94 lb Solid Fraction :40.5% BASE FLUID Type :Fresh water Density :8.32 lb/gal Base Fluid :4.548 gal/sk Additives Code Conc. Function 0047 0.200 gal/sk cement Antifoam D185 0.060 gal/sk cement Dispers.LT D168 0.350 gal/sk cement Fluid loss D177 0.010 gal/sk cement Retarder Rheometric Measurements Rheometer type :35 (rpm) At 75 degF Geometry :R1B1 (deg) Spring No :1.0 300 154.0 200 115.0 100 65.0 60 43.0 30 24.0 6 6.0 3 3.5 I Viscosity:(cP) 10 sec Gel Strength 3.20 Ibf/100ft2 10 min Gel Strength 8.54 Ibf/100ft2 Page 19 SP2B-NW3 cemcade v17.28.15.cfw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wcs-cem476_02 • S Client : Eni Petroleum Well : SP21-NW1 S hlumherger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Fresh H2O DESIGN Fluid No:5 Density :8.32 lb/gal Rheo.Model :HERSCHEL_B. k :5.23E-3 Ibf.s^n/ft2 At temp. :80 degF n :0.291 Ty :1.04lbf/100ft2 Gel Strength :3.20 Ibf/10092 WASH Wash Type :Water Water/Wash(vol.):100.0% Job volume:5.0 bbl Mud Type :WBM BASE FLUID Type :Fresh water Density :8.32 lb/gal Page 20 SP28-NW3 cemcade vi 728.15.cfw;07-28.2015: LoadC se Intermediate Casing 95/8;Version wcs-cem47602 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Section 5: centralizer placement Top of centralization :13800.0 ft Bottom Cent.MD :16400.0 ft Casing Shoe :16410.0 ft NB of Cent.Used :66 NB of Floating Cent. :66 Centralizer Placement Bottom MD Nbr. Cent./ Cent.Name Code Min.STO ©Depth (ft) Joint (%) (ft) 16370.0 64 1/1 9 5/8"X 12 1/4" 61.3 14090.0 HYDROFORM 16410.0 2 2/1 9 5/8"X 12 1/4" 68.8 16410.0 HYDROFORM Centralizer Description Centralizer Tests Cent.Name Code Casing Max. Min.OD Rigid Origin Hole Size Running Restoring OD OD (in) (in) Force Force (in) (in) (lbf) (lbf) 9 5/8"X 12 1/4" 9 5/8 12.250 12.250 Yes N.A. N.A. N.A. HYDROFORM c:U ft _ 0 S 0 60 80 100 userCst. -At Cert 0 Pipe Standoff Page 21 SP28-NW3 cemcade 0728.15.dw;07-28.2015; LoadCase Intermediate Casing 95/8;Version wcs-cem47602 • • Client : Eni Petroleum Well : SP21-NW1 Schlumberger String : 9 5/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Section 6: WELLCLEAN II Simulator %ft % 0 25 50 75 100 0 25 50 75 100 o_ I I I I Std Betw.Cent. Mud Contarrination Cement Coverage Uncontarrinated Slurry 0 o- 0 T O - 111 1 1 3 O N— Cement Coverage Uncontaminated Slurry Page 22 SP29-NW3 cemcade v17.28.15.cfw;07-28-2015; LoadCase Intermediate Casing 95/8;Version wcscem476_02 I S Client : Eni Petroleum Well : SP21-NW1 Schle berger String : 95/8 Intermediate Casing District : Prudhoe Bay,AK Country : USA Loadcase : Intermediate Casing 9 5/8 Risk Mud on the Wall Fluids Concentrations a g t ' 14000 <` 14060 14000— T- —1.4000 14 500 ,... 14500 14395- -fes00 i. 1500013000 ` `- 15000- -15000 v A 19500 15700 B a 19000- -15509 8 16000 " 16000 16000 "—16000 16500 16500 16500-1 -18500 14.0 0 9 E c 9 3 3 3 5 3 i 2 = High 1111111 Low = Mud I I Medium ED None III Fresh H2O 15.8 ppg Tail 0 12.5ppg DeepCRETE ® MUDPUSH II Page 23 5P2&NW3 cemcade 0728.15.ctw;07-28-2015; LoadCase Intermediate Casing 95/0;Version wrs-cem476_02 • • Attachment 6 FIT & LOT Procedure • • SPEO IDENTIFICATION CODE PAG 206 OF 338 ENI S.p.A. Eiji E&P Division REVISION STAP-P-1-M-6140 0 1 15. LEAK OFF TEST PROCEDURE A Leak-Off Test (LOT) will be performed On Wild-Cat wells at each casing shoe after setting the surface casing. LOTs are also recommended to be carried out on both appraisal and development wells. Leak Off Test and Formation Integrity Test (FIT), also termed the Limit Test, are for formation strength pressure tests made just below the casing seat prior to drilling ahead. These tests are carried out to: • Investigate the cement seal around the casing shoe which should be at least as high as the predicted fracture pressure for the area. • Investigate the wellbore capability to withstand pressures below the casing shoe in order to allow proper well planning with regard to the setting depth of the next casing, mud weights and alternatives during well control operations. • Collect regional information on formation strengths and stress magnitude for different applications including optimisation of future well planning, hole stability analysis and modelling, reservoir application. Prior to a test, a decision should be made to either increase the pressure until leak off occurs (as in the LOT) or to stop at a predetermined pressure for a (FIT). It should be noted that: • FIT does not obtain information on stress magnitude. • A LOT is designed and should be performed to determine, in a better way, the desired data without breaking down the formation. When a Formation Integrity Test is required, the maximum pumping pressure is often expressed in terms of`Equivalent Mud Weight' (EMW): Imperial units EMW = P +MW 0.052 x TVD where: P = Pumping Pressure (psi) TVD = True Vertical Depth (ft) MW = Actual Mud Weight(PPG) Metric units EMW = P x 10 + MW TVD where: P = Pumping Pressure (kg/cm2) TVD = True Vertical Depth (m) MW = Actual Mud Weight(kg/I). • • S ' IDENTIFICATION CODE PAG 207 OF 338 ENI S.p.A. Eni E&P Division REVISION STAP-P-1-M-6140 0 1 LOTts or FITs can be carried out in any open hole section and at any time while drilling the hole, even if it is customary to have it performed some metres (6-15 metres) below the casing. For instance, the casing seat can be in a shale and the first sand formation may be encountered several hundred feet deeper. This will certainly be more permeable than the shale, and a test can be performed to ascertain the maximum pressure this sand can hold. If it is lower than the shale just below the casing seat, this sand becomes the limiting factor. Note Information obtained from leak-off tests in straight holes is not applicable to deviated holes in the same field and vice versa. 15.1 TEST PROCEDURE Prior to performing a formation strength test, prepare a sheet of graph paper to record pressure, versus cumulative mud volume. 1) Drill out the float equipment, clean the rat hole and drill 5m of new hole. 2) Circulate a mud quantity equal to the internal string volume plus the new hole plus 50m internal casing volumes. This mud shall be cleaned and conditioned to the density and filtrate as indicated in the Mud Programme to be used for the next drilling phase. 3) Pull the bit back into the casing shoe. 4) Rig up the cementing unit to the drill pipe. The unit shall be equipped with high precision, low pressure gauges. The range of the pressure gauge shall be selected based on the actual mud weight and the estimated (LOT) or predetermined (FIT)pressure. A pressure recorder should be used during the test. The use of the rig pumps for making these tests is unsuitable. 5) Fill and test the lines with mud. 6) Break circulation with the cementing unit to make sure that the bit nozzles are clear. Stop pumping when circulation is established. 7) Close the top pipe rams or the annular. 8) In surface well head both flanged and multistage wellheads, open the annulus of the previous casings. In sub sea well head pay attention to not excide the burst pressure of the previous casing. 9) Pump slowly and in continuous way, until pressure builds up to approximately half the anticipated maximum surface pressure. 10) Once pressure is established, pump uniform volumes of mud and wait for the time required for the pressure to stabilise. The flow rate range is from 1/8 bbl/min (20 1/min) up to a maximum of 1 bbl/min (160 I/min), however values of 0.25 bbl (121/4" and smaller holes) or 0.50 bbl (171/2" hole) are commonly used. 11) Note the cumulative mud volume pumped, the final pumping and final static pressure. 12) Repeat steps (9) and (10) above and plot pressure versus cumulative mud volume for each increment of pumped volume. • • SPEO IDENTIFICATION CODE PAG 208 OF 338 ENI S.p.A. Eni E&P Division REVISION STAP-P-1-M-6140 0 1 13) Continue this procedure until: • Two or three points on the plot are reached where the pressure deviates and falls below the approximate straight line (or if the pressure does not increase with the injected volume). The point on the plot where the curve begins to bend away from the straight line is called Leak Off Point (Refer to Figure 15-1) • Or the predetermined test pressure is reached. 14) Stop pumping, shut in the well, record and plot pressure versus time until stabilisation (usually it takes 15-20min). In the early stage (2-3min) one value every 15-30sec should be collected while for the remaining a value of pressure every 30- 60sec may be sufficient. The use of PACR or an equivalent device, if available, is preferred. 15) Bleed off the pressure and record the quantity of fluid returned into the cementing unit. Compare it to the volume used for the test to obtain the amount of fluid lost to the formation. 16) Open the BOP and calculate the formation strength in terms of `Equivalent Mud Weight' using the lowest between leak off point pressure and stabilised pressure. 17) Collect the data recorded during the test in a data sheet together with the following information: borehole diameter, depth of test, depth and type of the last casing, mud density, plastic viscosity, filtrate and gels (refer to the example on the next page). Note: The LOT pressure doesn't exceed the pressure which the casing was tested. Note: When a good zonal isolation behind the casing is imperative, the Leak- off test should be carried out with a retrievable packer to avoid pressurising the casing which may cause possible permanent damage to the cement bond by the creation of micro annuli in the cement. Note: The pumping rate should be kept within the limits described in step 9). If the rate is too low, filtration losses will mask any leakage loss, or, if the rate is too high the formation may suddenly break and the leak off pressure will not be determined. Also, the longer the open hole section, the higher should be the injection rate. If the initial pumping rate is not sufficient, the well should be depressurized and the test restarted with a higher rate. Note: If a float valve is used in the drilling string, the test can not be carried out by pumping down the drill pipe. In this case rig up the cementing unit to the choke or kill line, fill and test the lines against the fail-safe and establish circulation through the riser. Close the BOP and perform the formation strength test pumping down the annulus. • • 1frios SPEO IDENTIFICATION CODE PAG 209 OF 338 ENI S.p.A. Emil E&P Division REVISION STAP-P-1-M-6140 0 1 LEAK—OFF TEST REPORT RepGrtP)" Date: WELL NAME: WELL CODE: CONTRACTOR: RIG NAME: RIG CODE: Open hole depth(m): 825 Mud Type: FWG ELS Rig type: J.UPs Hole Diameter(in): 12114 Weight(KgA): 1.3 R.K.B.ele,.wton(m): 26 Last Csg.Shoe(m): 797 Marsh Viscosity(sec/Ot): 44 Water Depth(m): 24 Csg.diameter On): 13'3/8 P'V.(cps): 19 Pumps: 12-P-160 Grade: .155 Y.P.ib/100 fe): 5 Liners(in): 6.5" Weight Qb/t): 61 Gelsgb/100 V): 2/8 Flow Fate(bpi): 0.25 Mao.Burst pres(psi): 3103 W.L(col3O min): 10.5 Litholog y Shale Expected EMW 1.68 Kg/cm2/10 m Time Vol Lin ePressure Time Volume Pressure Time Volume Pressure (min) (bd) (Psi) (mini (bbl) (Psi) (min) (bbl) (Psi) 1 025 50 9 2 400 16 2 435 2 050 100 95 2 480 3 0.75 200 10 2 470 4 1D 0 300 10.5 2 463 5 125 400 11 2 455 6 150 500 11.5 2 450 7 1.75 570 12 2 445 8 2D0 600 13 2 440 8 200 550 14 2 437 8.5 2110 505 15 2 435 Nd e: Pumped with a constant low rate of(bbl): '...plume pumped(bbl): \Slume returned(bbl): (pot) 1000 900 800 - stop pump P 700 e 600 - shut in curve S �, 500 S �—a U 400 r - 8 minutes e 300 200 100 . 0 0 0,25 0,5 0,75 1 1,25 1,5 1,75 1 2 3 4 5 6 7 8 9 10 11 12 Cumulative Volume(UN) �_ ►. Time mins RESULTS: (P ress.mw+Press.w.)x1 ODD epth=[(1.3 x 797 110)+(430 x 0.07)1 x 10 1797=1.68(Kg/cm°tl 0 m) Note: I Company Representatire Figure 15-1 - Leak-Off Test Report I • Attachment 7 Surface Platt • • Iii'V. DATE BY a CX APP DESCRIPTION REV DATE BY CK APP DESCRIPTION VICINITY MAP SCALE: - 2 N _ ._.- �. _f_ . zx --.t.,-4 , . r g i+. 7 .. .,... , -- THIS 2,5 '� 3>� ,) SURVEY, ! ;�z — __ ... ,, .n__ _ _ _ _ —_ a L ,_ W W t,l J I � .._ � 'a ;.p I ,'.' fY Q 31 3`d 4_) 44 1'j 2, �� as.P r�apa3, za. p T14N II4N f I 1 T13N ' Tt3N I . ` I ., k3UKTbK PpN7 PAD* 'DOCK i - I I �:r j ., "" .. o\' �r 'I \� i sii�' t\ I S—.- r r \k r • s NOC a I _— ) 1f 11' Nk 14 �1 -, DS' 3Q; ps U iP s Tom', ) � � ��. 1 � i �, � __.__. _� r rpt _. #D r .1.L` 21 t2 •.5 �a , !�` , 4 s»i`x` 11 M"'T�Si° �. ° $ ."0 i"�� I t .y I €1 1 ' _ ' t ,� r" . 28 21 n D� ( 11 "t "• i 'tU.„9:.9' 1Thwero �y�'" `... ` ._ ._.. _ ' �n1,t _ ... MP {, sox. DRAWING NOTES: 1. GRID COORDINATES SHOWN ARE ALAKA STATE PLANE, ZONE 4, NAD83. DISTANCES SHOWN ARE TRUE HORIZONTAL DISTANCES. 2. GEODETIC COORDINATES SHOWN ARE NAD83. 3. BASIS OF LOCATION DERIVED FROM GPS STATIC OBS. PROCESSED INTO OPUS SOLUTIONS. 4. CONDUCTORS ARE LOCATED WITHIN PROTRACTED SECTION 19, TOWNSHIP 14 NORTH. RANGE 9 EAST. UMIAT MERIDIAN. 5. ELEVATIONS SHOWN ARE B.P.M.S.L. DATUM. 6. ALL SECTIONS SHOWN AND/OR REFERENCED IN THIS DRAWING ARE 'PROTRACTED SECTIONS'. 7, REFERENCE LOUNSBURY DOCUMENT E-087 FOR COORDINATE VALUES IN NAD27. SURVEYOR'S CERTIFICATE ` 49th '� " 0 I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND 0 LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OFi,• c,,:.?.... ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY 0 0 FRANCIS J. CORNING rF if: DONE BY ME OR UNDER MY DIRECT SUPERVISION AND ♦ s •; a�LS 10685 THAT ALL DIMENSIONS R 01, AND10 OTHER DETAILS ARE CORRECT •♦l' •.AS , to/d-(tvif.='•Cr,'_ ,,♦•041�FF .ss!ot4 0•� IR* coo,4%, SPY ISLAND DRILL SITE - `1_-_,U WELL CONDUCTORS n�•• v 4. AS-BUILT LOCATIONS till II II . -4a' r" t CAD FIIE:EN13543D9 us ��era��n OATS- /o1/zo,o DRAWING NO: Eni-3543—d9 PART: REV: 3 REO • • REV DATE BY CK APP DESCRIPTION REV DATE BY I CK APP j DESCRIPTION ' `� L4 4 • I 4, N 5ovS 4,.(5)\ W 1 A.S.?. NAD83. 7. :. 4) ^1 001/0° _ J 1 W dt .d N N J CT 000000L'74'-'.- O J IQ iJ -T- N � _ N p p� dt 44 CO p I DETAIL A. SCALE: 1"--.80, co SANDBAG TOE Ilk Goya,SHDULDER 1a nns o$6 At;IC; Pt‘ � ii 001/0017 Gs.. t xtiti DETAIL A \,it ¢ L ,, SPY ISLAND DRILL SITE (SID) GRAVES s"O11LD ' 7------- ANDBAG TOE LEGEND SCALE 0 100 200 0 = WELL CONDUCTOR AS—BUILT THIS SL;RVEY ii _inia r znn' ir....0* et&Qsfo�, SPY ISLAND DRILL SITE v. % WELL CONDUCTORS n• , AS—BUILT LOCATIONS 'Pin] II (� • (p� y to m P CA; , 35431)9 �i�"�����nJ DA110/01/2010 DRAWING NO: Eni-3543--d9 PART 2 of 3 RE 0 I • Ri.V DATE BY CK APP DESCRIPTION_ REV DATE BY ' CK 5 I APP DESCRIPTION C6.,, '..',� "- ::c �'CV�( . Protracted Section 19, T. 14 N., R. 9 E., Umiat Meridian Alaska State Plane, NAD83 GRI[) NAD83 Geographic 1 Section Line Offset Pad Well No. 'Y' 'X' Latitude (N) Longitude (W) F NI F.E.L Elev. (US ft.) (US ft.) 1 6053423.20 1651769.82 70033'27.209" 149°54'24.765" 797 1171 12.4 2 6053421.65 1651761.87 70033'27.194" 149°54'25.000" 798 1179 12.4 3 6053420.07 1651754.10 70033'27.179" 149054'25.229" 800 1186 12.4 4 6053418.56 1651746.17 70033'27.164" 149"54'25.463" 801 1194 12.4 5 6053417.03 1651738.44 70°33'27.149" 149°54'25.692" 803 1202 12.4 6 6053415.54 1651730.54 70°33'27.134" 149"54'25.925" 804 1210 12.4 7 6053412.44 1651714.77 70°33'27.104" 149°54'26.391" 807 1226 12.4 8 6053410.91 1651706.96 70°33'27.089" 149054'26.622" 809 1234 12.4 9 6053409.39 1651699.11 70°33'27.074" 149054'26.853" 810 1241 12.4 10 6053407.94 1651691.31 70°33'27.060" 149°54'27.084" 812 1249 12.4 11 6053406.32. 1651683.39 70033'27.044" 149054'27.318" 813 1257 12.4 12 6053404.80 1651675.51 70°33'27.029" 149°54'27.551" 815 1265 12.4 13 6053400.38 1651652.80 70°33'26.986" 149°54'28.221" 819 1288 12.4 14 6053398.83 1651644.95* 70°33'26.971" 149°54'28.453" 821 1296 12.4 15 6053397.31 1651637.12 70°33'26.956" 149"54'28.685" 822 1304 12.4 16 6053395.82 1651629.26 70°33'26.942" 149054'28.917" 824 1311 12.4 17 6053394.32 1651621.47 70033'26.927" 149054'29,147" 825 1319 12.4 18 6053392.78 1651613.58 70"33'26.912" 149"54'29.380" 827 1327 12.4 19 6053389.63 1651597.90 70°33'2.6.881" 149054'29.843" 830 1343 12.4 20 6053388.17 1651590.00 70°33'26.867" 149'54'30.076' 831 1351 12.4 21 6053386.60 1651582.24 70°33'26.852" 149054'30.306" 833 1358 12.4 22 6053385.19 1651574.35 70°33'26.838" 149"54'30.538" 834 1366 12.4 23 6053383.64 1651566.41 70°33'26.823" 149°54'30.773" 836 1374 12.4 24 6053382.12 1651558.61 70033'26.808" 149"54'31.003" 837 1382 12,4 25 6053377.65 1651535.94 70°33'26.764" 149°54'31.673" 842 1405 12.4 26 6053376.14 1651528.13 70033'26.750" 149054'31.904" 843 1413 12.4 27 6053374.53 1651520.23 70°33'26.734" 149°54'32.137" 845 1421 12.4 " ----- 28 6053373.11 1651512.46 70°33'26.720" 149°54'32.366" 846 1428 12.4 29 6053371.56 1651504.49 70033'26.705" 149°54'32.602" 848 1436 12.4 30 6053370.06 1651496.66 70°33'26.690" 149°54'32.833" 849 1444 12.4 31 6053367.05 1651480.97 70033'26.661" 149°54'33.296" 852 1460 12.4 32 6053365.47 1651473.16 70°33'26.646" 149°54'33.527" 854 1468 12.4 33 6053363.93 1651465.22 70°33'26.631" 149°54'33.762" 8551476 12.4 34 6053362.44 1651457.37 70033'26.616" 149°54'33.993" 857 _ 1483 12.4 35 6053360.91 1651449.52 70°33'26.601" 149°54'34.225" 8581491 12.4 36 6053359.33 1651441.62 70°33'26.586" 149054'34.459" 860 1499 12.4 37 6053356.19 1651425.30 70"33'26.555" 149°54'34.941" 863 1516 12.4 38 6053354.74 1651417.32 70°33'26.541" 149°54'35.177" 864 1524 12.4 .Slik.. ae,��v&asfoc SPY ISLAND DRILL SITE U y. WELL CONDUCTORS • ,. . AS-BUILT LOCATIONS 2n11 r',-„,40' T n. N13S43Gg LfiSS ©1 11 1Inracg 0ATE10/01/2010 DRAWING NO: Eni-3543-d9 PART: 3 REO O 7 CO O O 0▪ L O W O W Lz r r r r r r r r r r v, r r r r r r r r r r r r r r r r r O an coY V at CJ Ni Ni Ni Ni Ni N Ni Ni Ni Ni N Ni N Ni Ni N Ni Ni N Ni N N Ni Ni Ni N N Ni Q Z Q0 O- w ri r-I e-I H ri rl e-I e-I e-i H H N ri ri ri ri N N H ri ri ri N N N r-I e-I C2$ C W 7 tryC .1-' J -- r-1 01 LD Cr N 0 L0 r '-I 01 N Ul CO l0 Cr r-1 01 N Ma-1 CO 10 Cr N U1 m ri CO N N CO 01 0 v--1 N m4 r U1 t0 CO 01 0 I--1 v-1N r in in l0 N CO O c-1 N N 70 `n L.L.1 Ln ri -1 -1 e-I N N N N N N N N N N m m m m M m m M m m r r r r J O LL N r D 1 a-1 ri N v- r- v-1i i v-1 rrv--I a--1 -1 -1 N N . r-1re-1 a--1 1-1H v-1i i v-1 v-1 e-1 v-1 v-1 w a _ J C o J .3.'' N CO O '-I m r N 01 0 N m U1 01 v--1 N r U1 N O ei m r 10 N N m U1 l0 (n L• .• V) N N 00 CO CO CO CO 00 00 CO CO CO CO CO CO CO CO co CO CO CO Woo co CO CO CO CO in CO N ci 01 01 01 01 ;-i N U1 CO 01 :-i N v v N o V m LO :-i c1 i-1 v v 00 e-1 r CO 0 r 0 m N 0 m l0 en N o m to 01 LO 01 N in 01 N 01 N U1 CO m LO Co O m Ln O N Cr N 01 .-1 W o n1 Ul N Ol Cr LO 01 L-1 M l0 N U1 N Ol -a en r-1 rmi .m-1 r-1rr-1 ia-1 r.-1 r-1-1 r-1-1 r-1-1 r-1-1 101 -l-1 .^-1 ,^-1 r^-1 r^-1 r^-1 v-1 e�-1 r-1-1 r-1 N n4 N NI O N O U Y 'vvCrCr r r 'it v7aCrCra "a "a "a "av "v ;LT a 'it a "av "v 'vv a • 110 ,rinLn Ul in in in in in U1 N Loll U1 U1 In in in UI In Ll U7 In UI Ul Ul en Ln ell 0 00 01 01 01 01 01 01 01 01 Cr, 01 Cr, 01 0 01 1 01 01 Zr, 1 01 01 Co001 Co Cr, 01 Co 01 01 01 r a v v v a Cr a Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr a Cr a tl0 ri ri r-1 ri r1 r1 ri ri ri ri r1 ri r1 ri r1 ri r1 r1 r1 r1 r1 ri r1 ri ri r-1 r1 c-1 O al — C7 h. " ^ 'D N ID ;--i 'CD -1 N l0 i-1 N N N in CO in Cl r 01 01 r 131 in U1 N N r-1 CO 0 z r m ri O oo N Cr N ri Cel 00 LO N O 01 n 10 r ri O o0 N LO Cr O CO 1, Ln < N N N N ri N rI ri ri 0 O O O 0 01 01 01 01 01 al CO 00 CO CO CO 1• N N Z (1) CO CO CO CO CO 00 CO CO CO CO CO CO CO co N N N N N N N N N N N N N N -o N N N N N N N N N N N N N N N N N N N N N N N N N N N N 7 in in in in M M M in M M in in in in M M in M M M in M M M M Co in M ...7.,..- m M en m M M M M M m e'n .c117171 M M m M M M m m m M M M M M co O o o o O O o 0 o O o o o o 0 0 0 o o O o o O O O o o O N N N N N N N N N N N N N N N N N N N N N N N N N N N N ti N 1W < O N l0 0 CO r Cr N LO N -1 0 01 0 U1 N LD CO 01 r1 -1 Cr 10 N N U1 Cr r N . ' K O o m M l0 N 01 r-1 m Ln LO l0 O r-1 m r LO I, ri N r Ln LO 00 ri M r lO CON. Z (9 O1 ri M UI N 01 m l0 CO O Ni r N4 LO 00 0 N N 01 <-1 M LA t\ U1 N Cl <-1 r - m M N ri 0 01 00 N L0 10 U1 r N r-1 0 01 01 CO L0 in U1 Cr M N 0 01 00 00 en N N N N N N LO LO l0 10 LOID LO U1 LO LD LD Ln U1 U1 Ln U1 U1 U1 Ln U1 Cr r Cr J °d 0 -i .-i ri ,i" ‘4" 1 ‘-1 -i r- i . ri •.--i ri r1 v--1 r-i r-i r-i ri r-i rl ,--T <-.1' ,-11' ,i" r-i r-i ‘-i. .4ri _ M < r1 r1 v-1r-1r-1 r-1 r1 N N r1 r1 N rl r-1 r-11-1 r-1 v-1 r-1 v-1 H r1 r1 r-1r-1r1 r-1 N J = co z U1 in in in V1 in in in in U1 in Ln Ln U1 U1 U1 In in in Ln Ln Ln U1 in in in Ln Ln -- ma a; ' < 0 N io < Z • 00 en U1 r ri r-1 r 0 CO M ri N L0 N 0 ri 11 N N LO 01 CO en r-1 r M en ri N 0 L = O U1 01 r Ol Ol M CO N CO N CO N 1, N n N LD U1 O r O N O Ln O r O 01 1� LO r r 0 CO 1� _U1 r N 00 LO UI m N 0 n co r M N O if; r N ri O y OD tri N LO 10 LD LO LO LO Ln U1 U1 U1 In Cr Cr Cr Cr r r M m M m en en N N N N ci Z U } LO LO LO LO LD LO LO LD LD LO LO LD L0 l0 L0 l0 L0 LO LO 1D LO tD LO 1.0 LD L0 10 O Q � a • LLLUUUUUULLULLLLLUiLLiUUIUUULA -p • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J Q L0 Lo co co L0 l0 LO LO LO LO L0 LO LO L0 L0 L0 Lo l0 l0 10 l0 Lo L0 L0 L0 L0 lA L0 .. O Ct C U1 O 01 M eV an ei N m r 00 ai a-I M U1 n n O M l0 LO q0 M m M r N LO 11 LA Y > N 0 N r LO 01 01 LD 01 N O CO 0 m U1 N Cr LO 01 ri CO W O corl 141 t. 0 LO 01 N en CO RS CU 0 r LALn Ln U1 Ln l0 LO LO N N N CO CO CO CO Cl Cl 01 0 0 o O -1 r1 ..4N N _I N N N N N N N N N N N N N N N N N N N m m m M m m M m M .4t ‘../ .- v "r 'rvavvvv "r 'rvvvvr4UUUUUrrvv "aa 'r 'p0 en en en en Ut en en en en en to Ln Ln Ln Ln U1 Ln en en en ton en to LIl U1 en en v1 O- O 01 01 01 01 01 01 01 01 01 01 01 O1 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 001 CC 0 r r r r r r r r Cr Cr Cr Cr Cr r Cr r r r Cr Cr r r r r r r r r r1 ri ri ri ri ri r+ ri ri ri r-1 r1 r1 r-1 r1 ri r1 r1 r-1 r-1 ri ri ri r1 ri rt r-I r1 be0 a, _ (7 en 01 r 01 r 01 r Cr 01 Cr O r 01 LO H LO N N N ei 1\ N 00 M CO r O Cr 0 < z 0 tm-1 N N rr-1 N 0� 0 0 0 O o 01 01 Ol 01 O1 al CO CO CO co CO CO N N N N Z 0J N N N N N N N N N N N N LO l0 LO LO to t0 1.0 LO LO to 1D LO LO LO l0 O N N N N N N N N N N N N N N N N N N N N N N N N N N N N in in in in in in in in in in in in in in in in in in in in in in in in in in in in .,, m m m m m enen m m 1,11r1 M M M M cn in /n en m m m M M enm m M to o O O o 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N I\ N o N N 0 N Cr Cr N 10 r-1 ri 01 N 0 U1 N L0 N CO 0 0 Cr U1 ri ri Cr M M 10 x K CO CO ri ri Cr. U1 N 01 ri M M U1 CO 01 ri N r Ln 01 0 N M r LO 01 v-1 N r H U, O1 -1 r LO co o4 LO -i M ClO1 rto N r M N 01 -i N O N r 1.0 CO to CO O Ni x LO LO in r M M ri o 01 01 CO N to or en N N rl 01 01 CO N 10 Ln M N N ri en m X N N N N 1, N N N 1.0 10 l0 1.0 10 L0 1.0 LO LO l0 Ln U1 U1 U1 U1 U1 U1 U1 Ln U1 CO 00 - r-i v-1-. -i. ri ri ri .4ri ri rti r-i ri ri ri v4 ri ri .-1. ,i' ,-i" ‘-i. ,-1. ,-i' ".-1- ri ri ,--1ri 0 0 U1 in in U1 U1 U1 U1 Ln U1 in U1 in in U1 U1 U1 in Ul Ln to in in U1 U1 Ln Ln Ln U1 < Q 10 LO LO LD LO LD LO LO l0 LO LO LO LO LO LD LO LO LO LO LO LO LO LO LO LO LO LO LO z Z ri ,. ri ,4 . ri ri rl rti ri ri ri ri .4 ri .4 .I ..1 . . ri ti ri . ri r1 .4 r-i N. a1 N c _ 0 i0 Q O in N LO 01 N 0 CO1 N N CO0 0l CrN U1 r en r-1 Z M r r N r COM M N ate-) N O o U1 O U1 r 01 en Ol m co m co m co. m 1, LO r-1 LO r-1 LD r-1 LO v-1 U1 rtn CO Cr; r1 O CO N Ln Ni O 01 N LO r o CO N Ln r N 01 CO l0 Ln m Ni N LO r m y N N N N ri r-1 -1 -I ri 0 0 0 0 0 CO Cl CO 01 01 CO CO CO CO CO CO N 1\ N N 7 > v v r r v v r r v r Cr r r m m Cr) m m M in CO in in m en M relcn s Y M m M M m m cn iri m M in M cri mi. M en M' in en in LY1 /n Lr1 m irl rri en cri Q In Ln U1 U1 U1 Ul Ln Ln Ln U1 U1 Ln U1 U1 U1 U1 V1 Ln Ln Ln U7 U7 U1 U1 U1 Ln U1 U1 m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q LO LO' LO Lo L0 L0 L0 L0 LO LD l0 L0 L0 Lo Lo LD l0 LD L0 LO LO LO l0 L0 l0 LO LO LO U U V1 7 0 0 = 0 'O m r\i tY U 0 00 O O N0• 0 O0 Z N N m r U1 LO n W 01 0 ,-iN M r Ln LO N CO 01 0 x-1 N m r UI LD N CO 00 ri ri r1 ri r-I r-1 r1 H r-1 ri N N N N N N N N N O Y C 0 i(0 al O V 00 0 0 ._, 0 rso 0 0 • 7• C o > • 0 teNo ,I....• w cc a > a s a a a a a a aa co N N N N N N N N N N• N \O Q Z O w .--I L-1ei e--1 -i ,-i ,-I N ei a •C T w 7 .fl C J t0 a O 00 t0 m e-I 01 tD a C N m a to t0 N CO 01 01 eti N 70 • "! a a a a a a a a ul to J O t- e-I a-1 e-1 ,- a-i a-i e-1 e-1 N N 01 C _ J C O • Co of N a to 1. Co O m a U •Z a Cr m Vl to i.Il to t0 t0 t0 .(1) ta_• 00 CO CO Co Co CO CO CO CO Co 1 in 4-1 t-ILFII Bai a N .moi v 0 in Ncr al - N a C:11ei m l0 00 O to t\ O ci ri N N N N N Co Co to -0 NINNINNNNNNN N .47" a a v V V V V V V V 0 , loll in in poll in to o in eofl in O- C 01 01 01 01 01 al 01 01 01 01 CD ° a a a a a a a a Cr a Co e-1 t i .-i ei e'-I e-1 ei t-I ei e-I 0 C) — C7 N- N N BioN Non 1 m 00 m to in Co M N Bo 0Q Z N N to tto tD tD tD to tin UI Z 0J n N n n N N 1� n n n -0 NNNNNNINNNIN 7 in in in in in Co in in in in m m m m m m m m m m —1 0 0 0 O O 0 0 0 0 0 N N N N N N N N N N F— N LW 0 O O N 1., 1, m CO m m .-1 a Q Co N CO L-1 Co a In N co in UI N- Z C7 m tri o r`i C to 6 o4 to r X o a N to tm N .-1 ei 01 CO cn ,-.1a Cr v a a Cr a v m M J 4.= 0.50 .-; ,i• ‘-i• ri e-? .-i ri _ M Q.-1 .-I 4-I4-1 .-1 ri I H e-I ,-i _J Z CO Z on to vl N in IA u1 to to ul N CO 0 ci. Ce 1 Q C N to Q Z E In tO to N Co m e-I m 01 a N L N a O1 0l m oo m co N O tD — CO 01 N a Co ri O Co N a N O = ei .--I ei e-1 <-1 O O O N Z5- l0 t0 t0 tD t0 t0 t0 tD t0 t0 Q Q. Y tri tri M Comm tri tri tri to VI to VI to to to to CD 0 0 0 0 0 0 0 0 0 0 J = w ¢ to to lB „ 6' t t0 to tD tD t„ - U r �/ co /� CO >> N m tD n N m V1 0l e♦ i-- 0. LL j 0 000 01 to 1� 01 N LID 01 N a 01 ,4 CON. N 0) tV (Ni to to m m a a a to V/ -0 Co m m M M to m to m to Q u ..• v v a v v v v v Cr v L 'm in to 0 0 on to Lr, an all Ln 0- C of Ol 01 01 Cr, 01 0l Zn 01 01 c3 ° a a a a a a a a a a tl0 ei H ,-.1 .--I r1 r1 ri ei ei .--I 0 C) _ C7 m 00 Zn O tO iD eti to .1 l0 in e-1 Q Z o^ to tO tO tO i-4 to coUII Ln UI tan za' to a to to to to to to to 6 -0 N N N N N NN N N N .• in Co in in in in in Co in in 1.7. m to m m to to m m m to _10000000000 0 0l to N tD N N, N N O N x — .7W01 -1 N M to tD M m T. C7 a O O m oI1 n O1 - U- n x O 01 00 N tD to a a N r•1 m m X to a a a a a a Cr a a CO 00 ei ri e-i ey ei ri .-i ,-Is .-i e'-1 0 0 Li-) In to to 0 0 to to to ul Q < t0 tD t0 t0 tO t0 tD t0 tO tD Z z T4 ei eti ri ei ,-i ei eti eti ,-i ^I all N C — 0 N Q LO t0 to N m a -1 m 01 a z • oll O O a 01 a 01 Cr) e-I N N ,- li O N tri Co N 0 0l 6 V N - N N tO tD tD t0 to to to to 7 co r m m m m to to m m m M Y m m m m m m m cri er m Q co 0 0 0 0 0 0 0 0 0 0 Q t0 6' tD tD tD tO to tO tD 6 O u 0 `n7 U O = O -O ei 0 e•i C m r\-I j: ,4.i. U O m o 0 N ---. •0 0 Z o1 0 ei N Co a to to N CO CC ,i 0) ,-i N N M to to to to m m to en O a. Y O Na9.• 0 cc O o 0 0 0 0 • • Attachment 8 1/4 Mile Scan Report 0 • s.,.. ropis SP28-NW3(P5)op4 Anti-Collision Detailed Report eni Analysts Method: 3D Least Distance Distance Unit ft Depth Interval: Every 50.00(ft)Measured Depth Azimuth Unit deg Step-down Trajectory: Reference Trajectory TC Azimuth Reference: North Analysis Date-24hr Time: July 29.2015-07:14 North Reference: True Analysis Machine: AKA-DEC-9010 Client Eni Petroleum Database I Project: localhostldrilling-Nikaitchuq 28 572 Version I Patch: 2 8.5720 NOTE:Measured Depth is referenced to individual borehole elevation. TVD,NS,EW are referenced to the reference trajectory's wellhead location and borehole elevation. A minimum of 0.300 m is always included for borehole diameters. All local minima Indicated. Results filtered:Depth 16400.00 ft c-MD 0--25341.21 ft,Ct-Ct separation r-1500.00 ft Results highlighted:EOU-EOU separation<=1320.00 ft Anti-Collision Rules Used Rule Set Name DAM AnliCollision Standard S002 v5.115.2 Exemption Risk Level: Minor Rule Name Risk Level Rule Tyne Rule I abet Noro Rule SLB Alert Zone Threshold OSF=5.0 5002 v5.1/5.2 Alert Ratio O5F=5.00 SLB Minor Risk Threshold OSF=1.5 S002 v5.1/5.2 Minor Ratio OSF=150 X SLB Major Risk Threshold OSF=105002 v5.1/5.2 Major Ratio O5F=1.00 SLB Surface Rule 5002 v5.1/5.2 Major CT CT MAS=328/(ft) SLB Alert Zone Threshold CtCt<=15m 5002 v5.1/5.2 Alert CT CT MAS=49.21(ft) Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 1 of 12 • • Reference Tra)eetory Summary Field: Nikedchuq Well: SP28-NW3 Structure: Spy Island Borehole: SP28-NW3 Slot SP28 Trajectory. SP28-NW3(P5)op4 Client: Eni Petroleum Type: Del Plan Coordinate System: NAD27 Alaska Slate Plane,Zone 04,US Feet North Reference: True Grid Convergence Angle: 0.08880162° Gild Scale Factor. 0.99890015 Magnetic Declination: 18.532° Magnetic Declination Date: November20,2015 Magnetic Model: BGGM 2014 Reference Point Northing Fasting 212a911 Structure Vag, Slot Unc 6053621.010(ftUS) 511481 670(ftUS) 54.100(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 sigma) Trelectory Error Model'ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Survevinc Prot'While Drilling Description Part MD From(ft) MD To(It) EOU Freq(ft) Survey Tool Type Hole Size(in) Casing Diameter(In) Borehole I Survey 1 0.000 41.000 1/100.000 SLB NSG+SSHOT-Depth Only-No Global 16.000 13.375 SP28-NW3/SP28-NW3(P5)op4 1 41.000 2300.000 1/100.000 SLB_NSG+SSHOT-No Glebe 16.000 13.375 SP28-NW3/SP28-NW3(P5)op4 1 2300.000 2783.673 1/100.000 SLBMWD+SAG-No Globe 18.000 13.375 SP28-NW3/SP28-NW3(P5)op4 2 2300.000 2783.673 1/100.000 SLB_M_VOD+GMAG-No Globe 16.000 13.375 SP28-NW3 I SP28-NW3(P5)op4 2 2783.673 4280.000 1/100.000 SLB_ W3 MWD+SAG-No Globs 12250 9.825 SP28-NW3/SP28-NW3(P5)op4 3 2783.873 16410.341 1/100.000 SLB_61 -No Globe 12.250 9.625 SP28-N /SP28-NW3(P5)op4 3 16410.341 17900.000 1/100.000 SLB_MWD+SAG-No Globs 8.750 5.500 SP28-NW3/SP28-NW3(P5)op4 4 16410.341 25344.215 1/100.000 SLB_MWD+GMAG-NO Globe 8.750 5.500 SP28-NW3/SP28-NW3(P5)op4 • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 2 of 12 • • Offset Trajectory Summary Offset Selection Criterlac Offset Selection Criteria:Definitive Surveys-Definitive Plans-Definitive surveys exclude definitive plans -All Non-Def Surveys when no Def-Surrey is set in a borehole-All Non-Def Plans when no Def-Plan is set in a borehole Offset Selection Summar( Wells Selected 3 Boreholes Selected 4 Definitive Surveys Selected:3 Non-Def Surveys Selected:0 Definitive Plans Selected:1 Non-Def Plans Selected:0 Total Trajectones:4 OSF filter in detailed report None •Excluded:The trajectory was analyzed and fully passed all criteria so the detailed results have been excluded horn this report for clarity. Trajectory Borehole Well Type Passing Excluded' SI26-NW2 5128-NW2 5126-NW2 Def Survey SI32-W2 S132-W2 S132-W2 Def Survey SP33-W3 SP33-W3 SP33-W3 Def Survey SP33-W3L1(Ptb) SP33-W3L1 SP33-W3 Def Plan Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 3 of 12 IP . Field: Nikedchuq Well: S126-M42 Structure: Spy Island Borehole: 5126-M42 Slot SP26 Trajectory: 5126-/V 2 Client: Eni Petroleum Type: Del Survey Coordinate System: NAD27 Alaska State Plane,Zone 04,US Feet North Reference: True Grid Convergence Angle: 0.08892286° Grid Scale Factor: 0.99990015 Magnetic Declination: 19.102° Magnetic Declination Date: November 15,2014 Magnetic Model: BGGM 2014 Reference Point (9l li0a Eastlnn Elevation Sirucure Unc. W.IJ2 e 6053824.030(ftUS) 511497 340(ftUS) 53 720(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 sigma) Trelectory Error Model:ISCWSAO 3-9 95.000%Con0denee 2.7955 sigma Survevine Prom As Drilled Description MD From(ft) MD To(ft) EOU Freq Survey Tool Type Hole Size(in) Casing Diameter(In) Borehole/Survey 0.000 40.620 1/90425 SLB_NSG+SSHOT-Depth Only-No Globe 16.000 13.375 SI26NW2/5126-NW2 40.820 40.620 Act-Stns SLB NSG+SSHOT-Depth Only-No Globe 16.000 13.375 SI26NN2/S126-NW2 40.820 827.570 Act-Sins SLB_NSG+SSHOT-No Globe 18.000 13.375 SI26-NW2/S126-NW2 827.570 2757.790 Act-Stns SLB MWD+GMAC-No Globe 18.000 13.375 5126-9002/S126-NW2 2757.790 2857.150 ActSOre SLB_MVr0-INC_ONLV_FILLER-No Globe 12.250 9.625 SI26NW2/S126-NW2 2857.150 15706.400 ActS1ns SLB_MWD+GMAG-No Globe 12.250 9.625 5128-NW2/SI28-NW2 15706.400 24002.840 Act-Stns SLB MWD+GMAC-No Globe 8.750 5.500 5126-NW2/5126-NW2 24002.840 24062.000 Act-Stns SLB_BLIND+TREND-No Globe 8.750 5.500 5126-NW2/5126-NW2 Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference ND Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status 18) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (') (ft) (ft) (ft) (ft) All local minima Indicated. Results(tared:Depth 16400.00 0<=MD no 25344.21 ft Results tiered:Ct-Ct separation<=1500.00 ft Results highlighted:Ct-Ct separation<=1320.00 ft 6400.00 3591.90 3504.86 -13941.17 571776 362583 4563.09 -12981.06 4480 142927 475.64 953.63 1111.85 4.51 OSF1.50 Warning 6450.00 359408 3539.24 -13977.41 5763.71 3628.80 4593.89 -13015.02 44.84 1428.17 476.35 951.82 1110.28 4.50 OSF1.50 Warning 6482.10 3595.61 3581.36 -14000.61 5792.01 3630.21 4612.94 -13035.90 45.17 142747 476. 951.1 1109.581450 OSFt.50 Warning 6500.00 3596.60 3573.75 -14013.50 5805.08 3630.76 4621.78 -13045.52 45.17 142707 475.81 951. 1109.5 451 OSFI.50 Warning 6550.00 3599.36 3608.34 -14049.50 5841.59 3631.97 4646.64 -13072.23 45.14 1426.25 474.34 951.91 1109.70 4.52 OSF1.50 Warning 6600.00 3602.13 3642.93 -14085.49 5878.09 3632.70 4671.76 -13098.69 45.04 472.83 953.08 1110.36 4.53 OSFI.50 Warning 6650.00 360449 3677.12 -14121.90 5936.04 3633.30 4711.76 -13140.62 43.77 426.27 475.39 950.88 1103.02= 4.51 OSF1.50 Warning 6700.00 360609 3710.53 -14159.06 5994.13 3833.71 4751.60 -13182.89 42.51 427.40 477.95 949.461 1108 44 4.49 OSF1.50 Warning 6750.00 3606.95 3743.18 -14196.94 8049.44 3634.90 4789.33 -13223.32 41.28 429.40 479.99 949.41 1109.08 4.47 OSF1.50 Warning 6800.00 360705 3774.97 -14235.51 8178.50 3639.35 4874.48 -13320.17 40.19 431.02 494.74 936.28 1100.87 4.34 OSF1.50 Warning 6850.00 3606.77 3806.36 -14274.43 6233.45 3641.12 4909.51 -13362.48 40.26 431.71 496.84 935.08 1100.29 4.33 OSF1.50 Warning 6900.00 3606.48 3837.75 -14313.34 6300.24 3643.45 4951.76 -13414.15 40.37 432.11 500.42 931.69 1098.17 4.30 OSF1.50 Warning 6950.00 3606.20 3869.14 -14352.26 6368.80 3646.48 4994.32 -13467.81 40.51 431.75 504.44 927.31 1095.13 4.26 OSF1.50 Warning 7000.00 3605.91 3900.54 -14391.18 6427.69 3648.39 5030.51 -13514.23 40.60 430.97 506.95 924.02 1092.68 4.24 OSF1.50 Warning 7060.00 3605.63 393193 -14430.09 6548.32 3650.92 5101.97 -13611.36 40.73 428.77 518.35 910.42 1082.87 4.14 OSF1.50 Warning 7100.00 3605.35 396332 -14489.01 6603.14 3650.90 5133.32 -13858.32 40.75 425.29 520.26 90502 1078.12 4.11 OSF1.50 Warning 7150.00 3605.06 3984.71 -14507.93 6656.89 3649.41 5163.95 -13700.48 4071 421.84 522.12 899.52 1073.23 4.09 OSF1.50 Warning 7200.00 3604.78 4026.10 -14546.85 6709.78 3647.49 5193.98 -13743.96 40.65 417.88 523.87 894.01 1068.31 4.06 OSF1.50 Naming 7250.00 3604.52 4057.33 -14585.89 6835.71 3642.55 5262.29 -13849.61 39.78 412.62 534.73 877.89 1055.80 3.97 OSF1.50 Warning 7300.00 360436 4087.91 -14625.45 6883.34 3641.34 5287.18 -13890.21 38.74 407.20 535.87 871.33 1049.62 3.94 OSF1.50 Naming 7350.00 3804.28 4117.80 -14665.53 8963.64 3641.10 5328.66 -13958.95 37.73 402.42 540.62 861.80 1041.68 3.90 OSF1.50 Warning 7400.00 3604.23 4147.13 -14706.03 7032.01 3642.87 5382.44 -14018.37 3745 306.90 543.92 85298 1033.96 3.86 0S81.50 Warning 7450.00 3604.19 4176.41 -14746.55 7077.98 3644.00 5385.08 -14058.33 3751 391.44 544.96 846.49 1027.81 3.83 OSF1.50 Whoring 7500.00 3604.15 4205.70 -14787.08 7123.28 3644.93 5407.54 -14097.69 37.55 386.13 645.94 840.19 1021.84 3.81 OSF1.50 blaming 7550.00 3604.10 4234.98 -14827.60 7168.26 3645.91 5429.96 -14136.67 37.54 380.98 546.91 83407 1016.04 3.79 OSF1.50 Warning 7600.00 3604.06 4263.87 -14868.42 7216.56 3647.02 5454.14 -14178.47 36.59 376.46 548.24 828.21 1010.63 3.77 OSF1.50 Warning 7850.00 3604.02 4292.03 -14909.73 7267.34 3648.17 5479.56 -14222.42 35.64 372.79 549.86 82293 1005.89 3.75 OSF1.50 Warning 7700.00 3603.98 4319.48 -14951.52 7313.18 3649.19 5502.52 -14262.08 34.68 370.03 550.95 819.07 1002.40 3.73 OSFI.50 Warning 7750.00 3603.93 4346.19 -14993.79 7357.28 3650.17 552477 -14300.13 33.73 368.34 561.90 816.44 1000.08 3.72 OSF1.50 Warning 7800.00 3603.87 4372.18 -15036.50 7398.31 3651.07 5545.65 -14335.45 33.10 367.75 552.51 815.24 999.09 3.72 OSF1.50 Warning 7850.00 3603.32 4398.23 -15079.18 7437.42 3651.83 5565.82 -14368.95 33.72 367.50 55289 814.60 99857 3.71 OSF1.50 Warning 7900.00 3602.38 4424.50 -15121.71 7476.27 365250 5586.12 -14402.07 33.81 11lMEME.E. 563.23 814.15 99824 3.71 OSF1.50 Warning 7950.00 3601.40 4450.77 -1516423 7514.25 3653.15 5606.24 -14434.27 33.87 367.70 570.291 797.421 987,18 3.60 OSF1.50 Warning 8000.00 3600.44 4477.05 -15206.78 7552.22 3653.85 5626.63 -14466.29 33.92 368.46 570.88 79778 98768' 36011 OSF1.50 Warning 8050.00 3599.48 4503.32 -15249.29 7588.49 3654.54 5646.39 -14496.70 33.98 369.68 570.80 798.88 988.82 3.80 OSF1.50 Warning 8100.00 3598.52 4529.60 -15291.82 7624.24 3655.20 5666.18 -14526.46 34.04 371.42 570.80 800.62 990.56 3.61 OSF1.50 Warning 8150.00 3597.58 4555.87 -15334.35 7661.15 3655.86 5688.93 -14556.98 34.09 373.88 570.91 80277 992.74 3.61 OSF1.50 Warning 8200.00 359660 4582.15 -15378.88 7704.07 3658.63 5711.30 -14592.30 3415 37628 571.81 804.47 99474 361 OSF1.50 Warning 8250.00 3595.75 4608.35 -15419.46 7746.97 3657.42 5735.83 -14627.48 33.87 37922 572.68 80654 997.11 3.82 OSF1.50 Warning 8300.00 359551 4634.12 -15482.30 7785.28 3658.14 5757.95 -14658.76 33.33 382.97 572.89 810.08 1000.72 3.62 OSF1.50 Warning 8350.00 3595.95 465943 -15505.42 7823.47 3658.88 5780.27 -14689.74 32.88 387.64 573.07 814.58 1005.27 3.64 OSF1.50 Warning 8400.00 3596.66 468457 -15548.63 7865.02 3659.68 5804.80 -14723.27 32.88 392.88 573.76 819.13 1010.05 3.65 OSF1.50 Warning 8450.00 3597.36 4709.71 -15591.85 7909.37 3660.33 5831.15 -14758.93 32.88 39834 574.89 823.44 1014.75 3.65 OSFI.50 Warning 8500.00 3598.07 4734.85 -15635.06 795240 3660.81 5856.86 -14793.44 32.86 40199 575.83 828.18 1019.77 3.66 OSF1.50 Warning 8550.00 3598.77 4759.99 -15678.28 7993.80 3661.54 5881.77 -14828.49 32.86 409.92 57650 833.42 1025.26 167 OSF1.50 Warning 8000.00 3599.48 4785.13 -15721.49 8036.49 3662.65 5907.64 -14860.44 32.87 416.14 577.34 838.80 1030.91 168 OSF1.50 Warning 8650.00 3600.18 4810.26 -15784.71 8085.04 366439 5937.12 -14898.97 32.90 422.47 579.06 843.41 1036.11 3.69 OSF1.50 Warning 8700.00 3600.89 4835.40 -15807.92 8134.06 3668.63 5966.88 -14937.85 32.95 428.84 580.83 848.01 1041.30 3.69 OSF1.50 Warning 8750.00 3601.59 4860.55 -15851.14 8184.46 3669.06 5997.47 -14977.84 33.13 435.20 582.80 852.39 1046.33 3.70 OSF1.50 Warning 8800.00 3602.13 4886.15 -15894.08 8231.29 3671.29 6025.89 -15014.99 34.09 441.04 584.20 856.84 1051.24 3.70 OSF1.50 Warning 8850.00 3602.39 4912.42 -15936.62 8272.92 3673.09 6051.31 -15047.91 34.80 446.33 584.77 861.56 1056.16 3.71 OSF1.50 Warning 9000.00 360254 4938.90 -15979.04 8317.99 3674.83 6079.05 -15083.39 3486 451.67 585.88 86580 1060.76 3.72 0581.50 Warning 8950.00 3602.70 4965.37 -10021.45 8380.66 3677.06 6117.43 -15132.88 34.92 456.83 589.73 867.10 1063.35 1 0581.50 Warning 9000.00 3602.86 4991.84 -16063.87 8431.30 3878.73 6148.20 -15173.06 34.97 461.67 591.72 869.95 1066. ® OSF1.50 Warning 9050.00 360101 5018.31 -1610629 8475.72 3679.94 6175.32 -15208.23 35.01 466.66 592.78 87188 1071.15 3.71 OSF1.50 Warning 9100.00 360317 504478 -16148.71 6522.15 3680.95 6203.79 -15244.89 35.03 471.82 594.17 877.65 1075.38 3.72 OSF1.50 Warning 9150.00 3603.33 5071.25 -16191.12 8570.07 3681.74 6233.24 -15282.68 35.05 477.04 595.79 881.25 1079.52 3.72 OSFt.50 Warning 9200.00 3603.52 509786 -16233.46 8629.17 3682.54 6269.52 -15329.33 35.66 482.05 599.10 882.95 1082.32 3.71 OSF1.50 Warning 9250.00 360391 5125.13 -16275.36 8697.16 368387 6310.68 -1538343 36.66 485.75 003.82 882.14 1083.01 3.70 OSF1.50 Warning • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 4 of 12 • ID Trajectory:SP28-NW3(P5)op4 Vs.5126-NW2 Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference WE Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Anon Ct-Ct Distance Separation Reference Clearance OSF Rule Status (0) (ft) (ft) (ft) 8) (ft) (ft) (ft) C) (ft) (ft) (ft) (ft) 9300.00 3604.51 5153.10 -16316.80 8771.62 368508 6354.89 -15443.33 37.64 1487.86 608.94 878.92 1081.57 3.67 OSF1.50 Warning 9350.00 3605.23 5181.79 -16357.75 8860.49 3686.15 6406.15 -15515.91 38.61 1488.05 615.99 872.06 1077.07 3.63 OSF1.50 Warning 9400.00 3605.98 5211.18 -16398.19 8909.50 3686.50 6433.87 -15558.33 39.58 1486.67 617.74 868.93 1074.51 3.81 OSF1.50 Warning 9450.00 3806.78 5241.27 -16438.11 8954.91 368624 6459.69 -1559389 40.53 1484.56 61904 865.52 1071.54 3.60 00F1.50 Warning 9500.00 3607.61 5272.05 -16477.50 8992.76 368570 8481.38 -1562469 41.48 1481.84 619.35 862.49 1088.61 3.59 OSF1.50 Warning 9550.00 3608.48 5303.35 -16516.49 9029.42 368509 6502.67 -15854.54 41.72 1478.92 619.46 85945 1065.61 3.58 OSF1.50 Warning 9800.00 3809.34 5334.67 -16555.45 9071.39 3884.47 8527.33 -15688.50 41.67 1476.37 620.28 856.09 1062.52 357 0071.50 Warning 9650.00 3610.20 5366.00 -16594.41 9124.52 3686.16 6558.43 -15731.52 41.70 1473.85 622.58 851.27 1058.47 3.55 OSF1.50 Warning 9700.00 3611.04 5397.36 -1663134 9183.01 3690.58 6592.33 -15778.98 4218 1471.12 625.49 845.63 1053.80 3.53 OSF1.50 Warning 9750.00 3611.60 5429.22 -16671.87 9244.20 3692.66 6627.59 -15828.94 43.18 1467.37 628.80 838.57 1047.85 3.50 OSF1.50 Warning 9800.00 3611.80 5461.69 -16709.89 9284.40 3692.51 6650.82 -15861.74 44.13 1462.85 629.34 833.51 1042.96 349 OSF1.50 Warning 9850.00 3611.64 5494.76 -16747.40 9324.56 369134 6674.30 -15894.31 45.05 145789 629.86 828.03 1037.65 3.48 00F1.50 Warning 9900.00 3811.10 5528.41 -16784.37 936319 3689.40 6697.10 -15925.42 45.97 1452.50 630.13 822.37 1032.08 346 OSF1.50 Warning 9950.00 3610.21 5562.65 -18820.80 9401.29 3686.99 6719.85 -15955.90 46.89 1446.75 830.28 81647 1026.23 3.45 OSF1.50 Warning 20000.00 3808.94 559745 -16856.68 943963 3684.10 6742.98 -15986.34 47.81 1440.62 630.42 810.20 1020.01 3.43 03F1.50 Warning 20050.00 3607.49 5632.53 -16892.27 9478.56 3680.62 6769.69 -16017.01 47.73 1434.49 630.63 803.86 1013.74 3.42 OSF1.50 Warning 20100.00 3606.04 5667.62 -16927.86 9517.48 3676.57 6790.62 -16047.43 47.62 1428.73 630.80 797.93 1007.87 3.40 OSF1.50 Warning 20150.00 3604.59 5702.70 -16963.46 9556.72 3672.05 6814.66 -16077.89 47.49 1423.34 631.00 792.34 1002.34 3.39 OSF1.50 Warning 20200.00 3603.14 5737.79 -16999.05 9598.02 3667.27 6839.54 -16108.17 47.35 1418.32 631.17 787.15 997.21 3.37 OSF1.50 Warning 20250.00 3601.69 5772.88 -17034.64 9838.01 3661.83 6866.02 -16140.31 47.19 1413.65 631.77 781.89 99215 3.38 03F1.50 Warning 20300.00 3600.26 5807.95 -17070.25 9882.29 3855.36 6894.03 -16173.98 46.87 1409.22 632.73 776.49 987.07 3.34 OSF1.50 Warning 20350.00 3599.03 5842.99 -17105.90 9720.54 364922 6918.32 -16202.89 46.68 1405.09 632.57 772.52 983.04 3.331 OSF1.50 Warning 20400.00 3597.83 5878.03 -17141.54 9750.96 3644.57 6937.93 -16225.67 4652 1401.57 630.91 770.66 980.63 3.34 OSF1.50 Warning 20450.00 3596.63 5913.08 -17177.18 9781.53 3640.32 6957.99 -16248.35 4638 1398.75 629.17 769.58 978.97 3.34 OSF1.50 Warning 20500.00 3595.43 5948.12 -17212.83 9820.76 3635.38 6984.14 -16277.17 46.21 1396.57 628.99- 76758 976.91 3.33 OSF1.50 Warning 20550.00 3594.23 5983.17 -17248.47 9875.12 3628.48 7020.36 -16317.11 45.99 139441 631.73 762.68 972.93 3.31 OSF1.50 Warning 20600.00 3593.03 6018.21 -17284.11 9925.38 3621.90 7053.74 -16354.10 45.77 1392.15 633.88 75847 969.37 3.30 OSF1.50 Warning 20650.00 3591.83 6053.26 -17319.76 9973.39 3815.43 7085.65 -16389.39 45.55 1389.96 635.19 754.77 966.17 3.29 OSF1.50 Warning 20700.00 3590.61 6088.18 -17355.51 0031.89 3608.28 7124.51 -16432.51 44.87 1387.88 838.72 749.16 961.74 3.26 OSF1.50 Warning 20750.00 3589.32 8122.80 -17391.57 0095.70 3603.88 7166.65 -16480.21 44.26 1385.78 643.19 742.59 956.69 3.23 OSF1.50 Warning 20800.00 3587.97 6157.11 -17427.92 0161.17 3603.31 7209.43 -16529.76 43.80 1383.58 647.84 735.74 951.36 3.21 OSF1.50 Warning 20850.00 3588.54 6191.10 -17464.56 0215.06 3605.22 7244.28 -1657082 4345 1381.42 650.29 731.13 947.57 3.19 OSF1.50 Warning 20900.00 3585.02 6224.86 -17501.41 0266.02 3807.53 7277.18 -16608.66 43.49 1379.52 652.20 727.33 944.40 3.18 OSF1.50 Warning 20950.00 358361 6258.62 -17538.26 0312.89 3609.92 7307.45 -1664537 43.64 1377.88 65337 724.32 941.78 3.17 OSF1.50 Warning 21000.00 3582.00 6292.37 -17575.12 035962 3612.41 7337.70 -16680.90 43.81 1375.96 654.49 72147 939.31 3.16 OSF1.50 Whoring 21050.00 3580.48 6326.12 -17611.98 0402.58 3614.37 7365.65 -16713.47 43.95, 1374.43 65495 719.48 937.47 3.15 OSF1.50 Warning 21100.00 3578.97 6359.88 -17648.83 0445.56 3615.52 7393.80 -16745.91 44.05 1373.17 655.4 717.7 935.9131 OSF1.50 Warning 2115060 3577.45 6393.63 -17685.69 0479.42 3615.92 7416.19 -16771.32 4411 137229 65414 718.1 835.8 3.15 OSF1.50 Warning 21200.00 3575.94 6427.38 -17722.55 0510.94 361610 7437.35 -1679468 44.16 1372.071 652.30 719.77 936.88 3.16 OSF1.50 Warning 21250.00 3574.46 6461.14 -17759.40 0542.48 3616.10 7458.84 -1881776 4421 1372.53 65035 722.18 938.64 717 OSF1.50 Warning 21300.00 3573.33 6494.92 -17796.25 0683.64 3615.99 7487.22 -16847.58 4429 137348 650.30 723.18 939.62 717 OSF1.50 Warning 2135000 3572.65 6528.72 -1783708 20626.74 3615.99 7517.08 -16878.66 4436 1374.64 650.58 724.05 940.59 117 OSF1.50 Warning 21400.00 3572.39 6562.55 -17869.90 0674.90 3616.03 7550.58 -16913.26 44.40 1375.86 651.97 723.99 940.98 317 OSF1.50 Warning 21450.00 3572.28 6596.39 -17906.71 0725.57 3615.76 7585.82 -16949.67 44.39 1377.25 653.97 723.27 940.94 316 0571.50 Warning • 21500.00 3572.17 6630.22 -1794353 20779.27 3615.27 7623.12 -16988.29 44.37 1378.47 656.61 721.86 940.40 115 OSF1.50 Warning 21550.00 3572.05 6664.05 -17980.34 20833.03 3614.94 7860.34 -17027.09 4436 1379.53 85924 720.29 939.71 114 OSF1.50 Warning 21600.00 3571.94 6697.89 -18017.15 20881.96 3614.64 7694.18 -17062.42 4436 1380.56 66087 719.69 939.65 3.14 OSF1.50 Warning 21650.00 3571.83 6731.72 -18053.97 20931.58 3614.25 7728.54 -17088.23 44.34 1381.62 662.65 718.98 939.53 113 OSF1.50 Warning 21700.00. 3571.72 6765.56 -18090.78 20984.04 3613.90 7764.82 -17138.12 44.33 1382.64 665.01 717.62 938.97 3.12 OSF1.50 Warning 21750.00 3571.61 6799.39 -18127.59 21038.39 3613.64 7802.31 -17175.45 44.32 1383.55 667.76 715.79 938.05 311 OSF1.50 Warning 21800.00 3571.51 6833.24 -18164.39 21095.32 3613.20 7841.42 -17216.83 - 44.47 138421 671.01 713.20 936.54 310 OSF1.50 Warning 21850.00 3571.52 6887.31 -18200.98 21154.67 3612.68 7881.93 -17260.19 44.79 1384.28 67469 709.59 934.16 3.08 OSF1.50 Warning 21900.00 3571.56 6901.47 -18237.50 21214.73 3612.56 7922.61 -17304.38 44.78 1383.88 678.50 705.39 931.22 3.06 OSF1.50 Warning 21950.00 3571.60 6935.62 -18274.02 21274.85 3614.51 7962.94 -17348.92 44.86 138112 682.23 700.89 927.97 3.04 00F1.50 Warning 22000.00 3571.64 6965.78 -18310.54 21327.24 381781 7997.78 -17387.90 4560 1382.09 684.41 69768 925.49 3.03 OSF1.50 Warning 22050.00 3571.68 7003.93 -18347.05 21376.08 3619.88 8030.33 -17424.25 45.08 1381.09 685.96 695.13 923.45 702 OSF1.50 Warning 22100.00 3571.73 7038.08 -18383.57 21426.92 3820.90 8064.29 -17462.08 45.13 1380.09 68795 692.14 921.13 3.01 OSF1.50 Warning 22150.00 3571.77 7072.24 -18420.09 21478.38 3621.07 8098.65 -17500.39 45.13 1379.05 690.10 688.95 918.`¢'4 304 OSF1.50 Warning 22200.00 3571.81 7106.39 -18456.61 21514.89 3620.81 8123.14 -17527.48 45.12 1378.2 689.34 688.861 918.321 300 06F1.50 Warning 22250.00 3571.90 7140.54 -18493.12 21550.55 3620.43 8147.34 -17553.65 45.1.iFiiiE 688.34 689.55 918.67 3.00 OSF1.50 Warning 22300.00 3572.36 7174.70 -18529.64 21592.34 3619.86 8178.01 -17584.05 45.06 378.05 688.52 689.53 918.71 3.00 OSF1.50 Warning 22350.00 3573.27 7208.84 -18566.15 21646.76 3619.37 821332 -17623.67 45.00 378.18 691.23 688.9kk 917.03 2.99 OSF1.50 Warning 22384.28 3574.14 7232.25 -18591.19 21679.41 3619.24 8235.65 -17647.48 44.95 37820 692.14 686.061 916.441 2.991 OSF1.50 Warning 22400.00 3574.58 7242.98 -18602.66 21691.55 3619.19 8243.98 -17656.32 44.94 378.25 691.99 686.26 916.60 2.99 OSF1.50 Warning 22450.00 3576.00 7277.11 -18639.17 21730.18 3619.00 8270.63 -17684.27 44.88 378.69 691.55 68714 91733 2.99 OSF1.50 Warning 22500.00 3577.42 7311.24 -18675.68 21770.34 3618.72 8298.59 -1771310 44.82 379.54 691.39 68815 918.28 3.00 OSF1.50 Warning 22550.00 3578.84 7345.37 -18712.19 21817.08 3618.52 8331.26 -17746.53 44.76 380.60 692.611 99 918.53 2.99 OSF1.50 Warning 22600.00 3580.26 7379.51 -18748.70 21863.33 3618.56 8363.67 -17779.53 44.70 381.78 69372 688.07 918.98 OSF1.50 Warning 22660.00 3581.68 7413.84 -18785.21 21907.51 3618.63 8394.73 -17810.95 44.65 383.15 694.37 688.78 919.91 2.99 OSF1.50 Warning 22700.00 3583.10 7447.77 -18821.72 21953.23 3618.67 8427.01 -17843.32 44.80 384.72 695.35 689.37 920.82 2.99 OSF1.50 Warning 22750.00 3584.52 7481.91 -18858.23 22016.47 3619.07 8471.48 -17888.28 4454 386.10 700.10 686.00 919.04 2.97 OSF1.50 Warning ` 22800.00 3585.81 7516.04 -18894.74 22083.70 3620.10 8518.24 -17938.58 44.52 386.96 705.58 681.38 916.25 2.95 OSF1.50 YWming y 22850.00 3586.69 7550.20 -18931.24 22151.72 3621.41 8584.88 -17986.07 4454 38713 711.07 676.05 912.75 2.93 OSF1.50 Warning 22900.00 3587.12 7584.38 -18967.74 22215.02 362265 8607.77 -18032.61 44.60 386.74 715.52 671.22 909.40 291 00F1.50 Warning 22950.00 3587.20 7618.57 -19004.22 22276.91 362387 8649.28 -18078.49 44.65 385.90 719.63 666.27 905.82 2.89 OSF1.50 Warning 23000.00 3587.25 7652.75 -19040.71 22335.17 3625.16 8688.02 -18121.99 4471 384.65 723.00 661.64 902.32 2.87 06F1.50 Warning 23050.00 3587.31 7686.94 -19077.19 22385.06 3626.38 8721.10 -18159.32 44.76 383.29 724.79 858.50 899.77 2.86 OSF1.50 Warning 23100.00 3587.38 7721.13 -19113.68 22438.60 3627.74 8755.26 -18197.88 4481 381.93 726.89 655.04 897.01 2.85 OSF1.50 Warning 23150.00 3587.41 7755.32 -19150.16 22490.54 3629.24 8790.92 -18238.33 4487 380.45 729.43 651.02 893.84 2.84 OSF1.50 Warning 23200.00 3587.46 7789.51 -19186.65 22530.61 3830.38 8817.41 -18268.37 44.92 379.00 729.371 669.631 892.421 2.841 OSF1.50 Warning 23250.00 3587.52 7823.70 -19223.13 22584.05 3631.28 8839.80 -18293.18 4496 378.11 727.99 65012 89246 2.84 OSF1.50 Warning 23300.00 3587.57 7857.88 -19259.62 2259750 3832.14 8862.51 -18317.73 44.9: iEfilillY 726.50 651.32 893.16 2.85 OSF1.50 Warning 23350.00 358789 7892.04 -19296.13 22643.84 3633.41 8894.23 -18351.50 44.93 1377.97 727.46 65050 892.66 2.84 OSF1.50 Warning 23400.00 3588.50 7926.14 -19332.69 22891.92 3635.03 8927.17 -1838648 4495 1378.24 728.82 64941 892.02 2.84 OSF1.50 Warning 23450.00 3589.12 7960.25 -1936925 22741.08 3637.10 8960.87 -18422.21 45.01 1378.56 730.44 648.12 891.27 2.83 06F1.50 Whoring Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 5 of 12 • I Trajectory:SP28-NW3(P5)op4 Vs.5126-NW2 Minimum Allowable Traveling Cylinder Albwable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (8) (ft) (ft) (D) (0) (ft) (ft) (') (ft) (ft) (ft) (ft) 23500.00 3589.73 7994.36 -19405.80 22790.36 3639.69 8994.64 -18458.01 45.10 1378.91 732.06 646.85 890.54 2.83 OSF1.50 Warning 23550.00 3590.35 8028.46 -19442.36 22841.90 3842.72 9029.93 -18495.45 45.19 1379.24 734.11 64513 889.51 2.82 OSF1.50 Warning 23600.00 3590.97 8062.57 -19478.91 22889.76 3645.62 9062.66 -18530.25 45.29 1379.54 735.42 644.131 888.941 28-4 OSF1.50 Warning 23650.00 3591.59 8096.68 -19515.47 22925.50 3647.25 9097.32 -18556.07 45.34 1380.19 73425 645.94 89036 2.82 OSF1.50 Warning 23700.00 3592.20 8130.78 -18652.03 22961.27 3648.08 9112.30 -18581.64 45.35 1381.35 733.06 648.30 892.32 2.83 OSF1.50 Warning 2375040 3592.82 8164.89 -19588.58 23001.76 3648.27 9140.88 -18610.32 45.34 1382.98 73287 650.11 894.07 2.83 03F1.50 Warning 23800.00 3593.31 8199.01 -19625.13 23045.15 3648.38 9171.67 -18840.90 45.35 1384.85 733.30 651.55 895.65 283 OSF1.50 Warning 23850.00 3593.36 8233.17 -19661.64 23093.43 3648.46 9208.06 -1867479 45.38 1388.89 734.78 652.10 896.70 283 03F1.50 blaming 23900.00 3592.81 8267.35 -19698.13 23147.28 364856 9244.36 -18712.65 45.41 1388.82 737.460 30 896.85183 06F1.50 Warning 23950.00 3591.60 8301.54 -19734.59 23187.93 3648.78 9273.27 -18741.22 ' 45.47 1390.79 737.17 653.62 899.02 2.83 OSF1.50 Warning 24000.00 3589.99 8335.74 -19771.03 23223.76 364933 9298.99 -18788.16 45.54 139324 735.71 657.52 902.43 2.84 0071.50 Warning 24050.00 3588.37 8369.95 -1980746 23268.53 3650.60 9331.41 -18797.01 45.64 1396.17 736.23 659.94 905.02 2.85 OSF1.50 Warning 24100.00 3586.75 8404.15 -19843.90 23373.74 3654.67 9405.97 -18871.12 45.94 1398.05 749.94 648.11 897.76 2.80 OSF1.50 Warning 24150.00 3585.13 8438.35 -1988033 23456.95 3657.59 9462.93 -18931.70 46.17 1398.18 758.31 639.88 892.32 2.77 OSF1.50 Warning 24200.00 3583.72 8472.55 -19916.78 23504.86 3657.94 9495.49 -18966.84 46.21 1397.96 759.60 638.36 891.24 2.76 OSF1.50 Warning 24250.00 3582.75 8506.74 -19953.25 23566.39 3658.42 9537.33 -19011.92 48.16 139773 763.62 634.11 888.33 2.75 0571.50 Warning 24300.00 3582.22 8540.91 -19989.75 23642.24 3653.37 9587.96 -19068.32 46.03 1396.57 770.34 626.23 88268 2.72 OSF1.50 Warning 24350.00 3582.10 8575.06 -20026.27 23694.15 3650.56 9622.28 -19107.17 45.89 1395.03 772.57 622.46 879.65 2.71 OSF1.50 Warning 24400.00 3582.12 860921 -20082.79 23761.92 3648.48 9666.83 -19158.06 45.72 1393.29 777.75 615.54 87446 2.69 00F1.50 Warning 24450.00 3582.14 8643.36 -20099.31 23836.26 3644.18 9714.63 -19214.96 45.64 1390.52 783.90 606.62 86759 2.66 OSF1.50 Warning 24500.00 3582.18 8677.51 -20135.84 23892.21 3642.58 9750.19 -19258.12 45.57 1387.33 786.84 600.49 862.44 2.65 OSF1.50 Warning 24550.00 3582.18 8711.65 -20172.36 23947.35 3640.30 9785.07 -19300.76 45.49 1383.93 789.67 594.26 857.16 2.63 OSF1.50 Warning 24600.00 3582.20 8745.80 -20208.88 24002.06 3638.81 9819.52 -19343.11 4535 1380.36 792.48 587.89 85172 2.61 OSF1.50 Warning 24650.00 3582.22 8779.95 -20245.41 24051.86 3633.03 9850.80 -19381.68 45.19 1378.71 804.01 572.70 940.3 2.571 06F1.50 Warning 24700.00 3582.24 8814.10 -20281.93 24062.00 3632.26 9857.17 -19389.53 45.16 1373.64 80121' 572.431 8391 257 OSF1.50 Warning 24750.00 3582.26 884825 -20318.45 24062.00 3632.26 9857.17 -19389.53 45.1.itgi3K 793.71 578.63 84288 259 OSF1.50 Warning 24800.00 3582.28 8882.39 -2035497 24062.00 3632.26 9857.17 -19389.53 45.18 1372.87 785.17 587.70 849.09 2.62 0071.50 Warning 24850.00 3582.30 8916.54 -20391.50 24082.00 3632.26 9857.17 -19389.53 45.17 1375.22 775.63 599.59 857.80 2.66 OSF1.50 Warning 24900.00 3582.29 8950.69 -20428.02 24062.00 3632.26 9857.17 -19389.53 45.17 1379.37 765.12 614.25 868.96 2.71 OSF1.50 Warning 24950.00 3582.28 8984.84 -20464.54 24062.00 3632.26 9857.17 -1938953 45.17 1385.31 753.71 63160 882.51 2.76 OSF1.50 Warning 25000.00 3582.27 9019.00 -20501.06 24082.00 3632.26 9857.17 -1938953 4517 1393.03 741.48 651.55 898.38 2.82 OSF1.50 Warning 25050.00 3582.26 9053.15 -2053758 24062.00 3632.26 9857.17 -19389.53 45.17 1402.49 728.48 674.00 916.50 2.89 OSF1.50 Warning 25100.0D 3582.25 9087.30 -20574.09 24082.00 3632.26 9857.17 -1938953 45.17 1413.65 714.82 698.83 936.78 2.97 0071.50 Warning 25150.00 3582.24 9121.45 -20610.81 24062.00 3632.26 9857.17 -19389.53 45.17 1426.48 700.56 725.92 959.11 3.06 OSF1.50 Vaming 25200.00 3582.23 9155.60 -20647.13 24082.00 3832.26 9857.17 -19389.53 45.17 1440.93 685.80 755.13 983.40 115 OSF1.50 Vaming 25250.00 3582.22 9189.75 -20683.65 24062.00 3632.26 9857.17 -19389.53 45.17 1456.95 670.63 786.33 1009.54 3.26 0071.50 Warning 25300.00 3582.21 9223.90 -20720.17 24062.00 3632.26 9857.17 -1938953 45.17 1474.50 655.12 819.38 1037.42 3.38 OSF1.50 Warning 25344.21 3582.20 9254.10 -20752.47 24062.00 3632.26 9857.17 -1938953 45.17 149124 641.20 850.04 1063.44 3.49 OSF1.50 Warning End of results / Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 6 of 12 I S Field: Nikedchuq Well: 5132-W2 Structure: Spy Island Boreho40: 5132-W2 Slot SP32 Trajectory: 3132-W2 Client Eni Petroleum Type: Del Survey Coordinate System: NAD27 Alaska State Piens,Zone 04,US Feet North Reference: True Grld Convergence Angle: 0.08849757° Gild Scale Factor: 0.989900149 Magnetic Declination: 20.047° Magnetic Declination Date: March 08,2013 Magnetic Model: BGGM 2012 Reference Point Northing Ems.3js Og Elevation 5800Wro Uno. Slot Unc. 6053613370(ftUS) 511442.370(ftUS) 53620(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 sigma) Traiectory Error Model:ISCWSAO 3-D 95.000%Confidence 2.7955 sigma SurveNno Prop;As Drilled Description MD From(ft) MD To(ft) EOU Freq Survey Tool Type Hole Slee(in) Casing Diameter(In) Borehole I Survey 0.000 40.520 1/98.425 SLB_NSG+MSHOT-Depth Only-No Global 16.000 13.375 6132-602/5132-602 40.520 40.520 Act-Stns SLB NSG+MSHOT-Dep0l Only-No Global 16.000 13.375 5132-W2/5132-W2 40.520 821.880 Act-Stns SLBNSG+MSHOT-No Global 16.000 13.375 6132-602/SI32-W2 821.880 2737.120 Act-Stns SLB_MWD+GMAC-No Global 16.000 13.375 SI32-W2/S132-W2 2737.120 9259.750 Act-Stns SLB_MWD+GMAG-No Global 12.250 9.625 S132-W2/5132-606 9259.750 18282.740 Act-Sbrs SLB_MWD+GMAG-No Global 8.750 5.500 5132-W2/0132-W2 18282.740 18350.000 Act-SIns SLB_BLIND+TREND-No Global 8.750 5.500 5132-W2/SI32-W2 Minimum Allocable Traveling Cylinder Allowable Deviaeon from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW Norm Adim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (5) (t) (0) (ft) (ft) (8) (ft) (0) (°) (ft) (5) ft) (ft) All local minima indicated. Results filtered:Depth 16400.00 ft<=MD<=25344.21 ft Results filtered:Ct-Ct separation c 1500.00 ft Results highlighted Ct-Ct separation r_1320.00 ft 6400.00 3591.90 3504.86 -13941.17 8350.00 3608.36 3154.45 -12490.24 49.09 49274 28.19 1364.54 1406.95 17.59 OSF1.50 Pass 6450.00 3594.08 3539.24 -13977.41 8350.00 3608.36 3154.45 -12490.24 49.09 536.21 24.82 1411.59 1452.80 18.63 OSF1.50 Pass 6500.00 3596.60 3573.75 -14013.50 8350.00 360836 3154.45 -12490.24 50.57 579.96 21.78 1458.19 1498.45 19.61 OSF1.50 Pass 655000 3599.36 3608.34 -14049.50 8350.00 3608.36 3154.45 -12490.24 50.57 624.00 19.56 1504.44 1543.97 20.53 OSF1.50 Pass 6600.00 3602.13 3842.93 -14085.49 8350.00 360836 3154.45 -12490.24 50.46 668.38 17.87 1550.51 1589.47 21.40 OSF1.50 Pass 6650.00 3604.49 3677.12 -14121.90 8350.00 3608.36 3154.45 -12490.24 4779 713.34 16.70 1596.83 1635.21 22.20 OSF1.50 Pass 6700.00 3806.09 3710.53 -14159.06 8350.00 360836 3154.45 -12490.24 44.87 759.03 15.97 1643.06 1681.39 22.93 OSF1.50 Pass 8750.00 3606.95 3743.16 -14186.94 8350.00 360836 3154.45 -12490.24 41.67 805.38 15.61 1689.77 1727.98 23.61 OSF1.50 Pass 6800.00 3607.05 3774.97 -14235.51 8350.00 3608.36 3154.45 -12490.24 38.12 652.30 15.51 1738.79 1774.97 24.25 OSF1.50 Pass 6850.00 3806.77 3806.36 -14274.43 8350.00 3608.36 3154.45 -12490.24 38.08 899.56 15.62 1783.94 1822.15 2484 OSF1.50 Pass 6900.00 3606.48 3837.75 -14313.34 8350.00 3608.36 3154.45 -12490.24 38.08 946.95 15.88 1831.07 1869.37 25.40 OSF1.50 Pass 6950.03 3606.20 3869.14 -14352.26 8350.00 3608.36 315445 -12490.24 3808 994.47 16.30 1878.18 1916.81 25.93 OSF1.50 Pass 7000.00 3605.91 3900.54 -14391.18 8350.00 3608.36 3154.45 -12490.24 38.08 2042.11 16.81 1925.30 1963.91 26.43 OSF1.50 Pass 7050.00 3605.63 3931.93 -14430.09 8350.00 3608.36 3154.45 -12490.24 3808 2089.86 1744 1972.42 2011.24 26.91 OSF1.50 Pass 7100.00 3605.35 3963.32 -14469.01 8350.00 3608.36 3154.45 -12490.24 3808 2137.71 18.14 2019.57 2058.62 27.38 OSF1.50 Pass 7150.00 360506 3994.71 -14507.93 8350.00 360836 315445 -12490.24 38.08 2185.66 18.92 2066.74 2106.05 27.79 OSF1.50 Pass 7200.00 360478 4026.10 -14546.85 8350.00 3608.36 3154.45 -12490.24 38.08 2233.70 19.75 2113.95 2153.54 28.20 OSF1.50 Pass 7250.00 3604.52 4057.33 -14585.89 8350.00 3608.36 3154.45 -12490.24 37.68 2281.88 20.61 2161.27 2201.15 28.60 OSF1.50 Pass 7300.00 3604.36 4087.91 -14625.45 8350.00 3608.36 3154.45 -12490.24 37.08 2330.34 21.45 2208.89 2249.05 29.01 OSF1.50 Pass 7350.00 3604.28 4117.80 -14865.53 8350.00 3608.38 315445 -12490.24 36.35 2379.07 22.24 2256.82 2297.24 29.42 OSF1.50 Pass 7400.00 3804.23 4147.13 -14706.03 8350.00 3608.36 3154.45 -12490.24 36.10 2427.99 23.00 2304.99 2345.66 29.84 OSF1.50 Pass 7450.00 3604.19 4176.41 -14746.55 8350.00 360836 3154.45 -12490.24 36.10 2476.97 23.76 2353.21 2394.13 30.25 OSF1.50 Pass 7500.00 3604.15 4205.70 -14787.08 8350.00 3608.36 3154.45 -12490.24 36.10 2525.99 24.52 2401.46 2442.64 30.66 OSF1.50 Pass 7550.00 3604.10 4234.98 -14827.60 8350.00 360836 3154.45 -12490.24 36.04 2575.04 25.28 2449.76 2491.19 31.06 OSF1.50 Pass 7600.00 3604.06 4263.87 -14868.42 8350.00 360836 3154.45 -12490.24 35.06 2624.22 26.00 2498.22 2539.89 31.47 OSF1.50 Pass 7850.00 3604.02 4292.03 -14909.73 835000 360836 3154.45 -12490.24 34.09 2673.58 26.64 2546.94 2588.82 31.90 OSF1.50 Pass 7700.00 3603.98 4319.48 -14951.52 8350.00 360836 3154.45 -12490.24 33.12 2723.09 27.22 2595.87 263795 32.35 OSF1.50 Pass 7750.00 3603.93 4346.19 -14993.79 8350.00 3608.36 3154.45 -12490.24 32.17 2772.73 27.71 2645.02 2687.26 32.81 OSF1.50 Pass 7800.00 3603.87 4372.18 -15036.50 8350.00 3608.36 3154.45 -12490.24 29.74 2822.47 28.13 269434 2736.72 33.29 OSF1.50 Pass 7850.00 3603.32 4398.23 -15079.18 8350.00 360836 3154.45- -12490.24 2271 2872.21 28.54 2743.67 2786.19 33.76 OSF1.50 Pass 7900.00 3602.38 4424.50 -15121.71 8350.00 3608.36 3154.45 -12490.24 22.36 2921.93 28.98 2792.85 283562 34.23 OSF1.50 Pass 7950.00 360140 4450.77 -15164.23 8350.00 3608.36 3154.45 -12490.24 22.36 2971.66 22.09 2849.57 2889.94 36.79 OSF1.50 Pass 8000.00 3600.44 4477.05 -15206.76 8350.00 3608.36 3154.45 -12490.24 22.36 3021.40 22.40 2898.99 2939.47 37.31 OSF1.50 Pass 8050.00 3599.48 4503.32 -15249.29 8350.00 3608.36 3154.45 -12490.24 22.36 3071.14 22.71 2948.43 2989.01 37.83 06F1.50 Pass 8100.00 3598.52 4529.60 -15291.82 8350.00 360836 3154.45 -12490.24 22.36 3120.90 23.02 2997.88 3038.56 38.35 OSF1.50 Pass 8150.00 3597.58 4555.87 -1533435 8350.00 3608.36 3154.45 -12490.24 22.36 3170.86 23.32 3047.34 3088.12 38.87 OSF1.50 Pass 8200.00 3596.60 4582.15 -15376.88 8350.00 3608.36 3154.45 -12490.24 2236 3220.43 23.61 3086.82 3137.69 39.38 OSF1.50 Pass 8250.00 3595.75 4808.35 -15419.46 8350.00 3808.36 3154.45 -12490.24 26.30 3270.21 23.90 3146.32 3187.29 39.90 OSF1.50 Pass 8300.00 3595.51 4634.12 -15462.30 8350.00 3608.36 3154.45 -12490.24 35.25 3320.05 24.14 3195.92 3236.97 40.43 OSF1.50 Pass 8350.00 3595.95 4659.43 -15505.42 8350.00 3608.36 3154.45 -12490.24 45.73 3369.93 24.34 3245.59 3286.71 40.97 OSF1.50 Pass 8400.00 3556.66 4684.57 -15548.63 8350.00 3608.36 3154.45 -12490.24 45.73 3419.82 24.52 3295.30 3336.48 41.51 OSF1.50 Pass 8450.00 359736 4709.71 -15591.85 8350.00 3608.38 3154.45 -12490.24 45.73 3469.72 24.70 3345.01 3386.25 42.06 OSF1.50 Pass I 8500.00 3598.07 4734.85 -15635.06 8350.00 3608.36 3154.45 -12490.24 45.73 3519.62 24.88 339474 3436.03 42.60 OSF1.50 Pass 8550.00 3588.77 4759.99 -15678.28 8350.00 3608.36 3154.45 -12490.24 45.73 3569.52 25.05 344446 3485.82 43.14 OSF1.50 Pass 8600.00 3599.48 4785.13 -15721.49 8350.00 3608.36 3154.45 -12490.24 45.73 361942 25.22 3494.20 3535.61 43.69 OSF1.50 Pass 8650.00 3600.18 4810.26 -15764.71 8350.00 3608.36 3154.45 -12490.24 45.73 366933 25.39 3543.94 3585.40 44.23 OSF1.50 Pass 8700.00 ' 3600.89 4835.40 -15807.92 8350.00 3608.36 3154.45 -12490.24 4573 3719.23 25.55 359368 3635.20 44.77 OSF1.50 Pass 8750.00 3601.59 4860.55 -15851.14 8350.00 3608.36 3154.45 -12490.24 44.66 3769.14 25.71 3643.43 3685.01 45.32 OSF1.50 Pass 8800.00 3602.13 4886.15 -15894.08 9350.00 3608.36 3154.45 -12490.24 38.71 3819.03 25.90 3693.13 3734.77 45.85 OSF1.50 Pass 8850.00 3602.39 4912.42 -15936.62 8350.00 3808.36 3154.45 -12490.24 35.07 3868.86 26.13 3742.73 3784.44 48.36 OSF1.50 Pass 8960.00 3602.54 4938.90 -15979.04 8350.00 3608.36 3154.45 -12490.24 35,07 3918.67 26.36 379231 3834.10 46.87 OSF1.50 Pass 8950.00 3602.70 4965.37 -16021.45 835000 3608.36 3154:45 -12490.24 35.07 3968.49 26.60 3841.90 3883.77 47.38 OSF1.50 Pass . 9000.00 3602.86 4991.84 -16063.87 8350.00 360836 3154.45 -12490.24 35.07 401832 26.83 3891.49 3933.44 47.89 OSF1.50 Pass 9050.00 3603.01 5018.31 -16106.29 8350.00 3608.36 3154.45 -12490.24 35.07 4068.15 27.05 3941.10 3983.12 48.39 OSF1.50 Pass 9100.00 3603.17 5044.78 -16148.71 8350.00 360836 3154.45 -12490.24 35.07 411798 27.27 3990.71 403280 48.90 OSF1.50 Pass 9150.00 3603.33 507125 -18191.12 8350.00 3608.36 3154.45 -12490.24 35.07 4167.82 27.49 4040.33 4082.50 49.41 OSF1.50 Pass 9210.00 360352 5067.86 -16233.46 8350.00 3608.36 3154.45 -12490.24 38.93 4217.85 27.71 4089.93 4132.18 49.81 OSF1.50 Pass 9250.00 3803.91 5125.13 -16275.36 8350.00 360836 3154.45 -12490.24 39.43 4267.41 27.96 413945 4181.77 50.40 OSF1.50 Pass 9300.00 3604.51 5153.10 -16316.80 8350.00 3608.36 3154.45 -12480.24 41.48 4317.08 28.26 4188.82 423125 50.87 OSF1.50 Pass 9350.00 3605.23 518179 -16357.75 8350.00 3608.36 3154.45 -12490.24 4192 436666 28.58 4238.08 4280.61 51.32 OSF1.50 Pass • Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 7 of 12 r Trajectory:SP28-NW3(P5)op4 Vs.5132-W2 Minimum Allowable Traveling Cylinder Allowable Deviation torn EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Asim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (R) (R) (R) (R) (ft) (R) (ft) (6) (') (R) (5) (R) (R) 19400.00 3805.98 5211.18 -16398.19 18350.00 3608.36 3154.45 -12490.24 42.47 4416.13 2886 4287.17 4329.83 51.75 OSF1.50 Pass 19450.00 3606.78 524127 -16438.11 18350.00 3608.36 3154.45 -12490.24 43.10 4465.48 29.36 4338.12 4378.91 52.16 OSF1.50 Pass 19500.00 3607.61 5272.05 -16477.50 18350.00 3608.36 3154.45 -12490.24 43.80 4514.70 29.82 4384.88 4427.82 52.55 OSF1.50 Pass 19550.00 3608.48 5303.35 -16516.49 18350.00 3608.36 3154.45 -12490.24 44.01 4563.82 30.30 4433.52 4476.62 52.93 OSF1.50 Pass 19600.00 3609.34 5334.67 -16555.45 18350.00 3608.36 3154.45 -12490.24 44.01 4612.95 30.78 4482.17 4525.43 53.30 OSF1.50 Pass 19650.00 361020 5366.00 -1659441 18350.00 3608.36 3154.45 -12490.24 44.01 4682.10 31,26 4530.84 4574.27 53.67 OSF1.50 Pass 19700.00 3611.04 5397.36 -1663334 18350.00 3608.36 3154.45 -12490.24 43.40 4711.28 31.73 4579.52 4623.11 54.04 OSF1.50 Pass 19750.00 3611.60 5429.22 -16671.87 18350.00 3608.36 3154.45 -12490.24 41.87 4760.32 32.23 4628.09 467184 54.39 OSF1.50 Pass 18800.00 3811.80 548168 -1670989 18350.00 3608.36 3154.45 -12490.24 40.86 4809.25 32.79 4676.46 4720.39 54.72 OSF1.50 Pass 18850.00 3811.64 5494.76 -16747.40 18350.00 3608.36 3154.45 -12490.24 39.97 4858.03 33.37 4724.66 4768.79 55.03 OSF1.50 Pass 19900.00 3611.10 5528.41 -16784.37 18350.00 3608.36 3154.45 -12490.24 39.31 4906.65 34.00 4772.66 4816.99 55.32 OSF1.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 8 of 12 I S Field: Nikaechsq Well: SP33-W3 Structure: Spy Island Borehole: SP33-W3L1 Slot SP33 Trajectory. SP33-W3L1(P1b) Client: Eni Petroleum Type: Del Plan Coordinate System: NAD27 Alaska State Plane,Zone 04,US Feet North Reference: True Grid Convergence Angle: 0.08843614° Grid Scale Factor: 0.999900149 Magnetic Declination: 18.834° Magnetic Declination Date: August 04,2015 Magnetic Model: BGGM 2015 Reference Point Nottghin Eaatlna Emilon 'fructose Unc. Slot Unc. 6053811.830(ftUS) 511434,430(ftUS) 54.100(ft)MSL 0.000(ft)(1 sigma) 0.000(ft)(1 sigma) Traiectory Error Model:ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Survevins Pros:While Drilling Description Part MD From(ft) MD To(ft)EOU Freq(ft) Survey Tool Type Hole Size(in) Casing Diameter On) Borehole/Survey 0.000 41.000 ActS1ns SLB_NSG+SSHOT-Depth Only-No Globe 16.000 13.375 SP33-003/SP33-003 41.000 648.000 ActSbw SLB NSG+SSHOT-No Globe 16.000 13.375 SP33-W3/SP33-003 648.000 3404.890 ActStrn SLB_MWD+GMAC-No Globe 16.000 13.375 SP33-W3/SP33-003 3404.890 10688.090 ActStn. SLB MWD+GMAG-No Globe 12.250 9.625 SP331693/SP33.003 10688.090 10735.000 1/100.000 SLB_MWD+GMAC-No Globe 12.250 9.625 0P33-W3L1/SP33-W3L1(P1 h) 10735.000 11050000 11100.000 SLB_MWD-INC_ONLV FILLER-No Globe 8,750 5.500 SP33-W3L1/SP33-W3L1(P1b) 11050.000 12550.000 1/100.000 SLBMWD+SAG-No Globe 8.750 5.500 SP33-W3L1/SP33-W3L1(1.1 b) 2 11050.000 19581.369 1/100,000 SLB MYVD+GMAG-No Globe 8.750 5.500 SP33-W3L1 I SP33-W3L1(P1b) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset TVD Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (n) (5) (ft) (ft) (ft) (ft) (ft) (ft) C) (ft) (ft) (ft) (ft) All local minima indicated. Results hared:Depth 16400.00 ft<=MD<=25344.21 ft Results tiered:Ct-Ct separation<=1500.00 ft Results highlighted:Ct-Ct separation<=1320.00 ft 6400.00 3581.90 3504.86 -13941.17 19581.37 3586.69 2105.02 -13430.79 218.94 489.98 38446 1105.52 1233.35 5.82 OSF1.50 Pass 6450.00 3594,08 3539.24 -13977.41 19581.37 3586.89 2105.02 -13430.79 218.94 534.87 38131 1153.58 1280.34 6.05 OSFI.50 Pass 6500.00 3596.60 3573.75 -14013.50 19581.37 3586.69 2105.02 -13430.79 217.79 580.13 377.81 1202.31 1327.92 6.29 OSF1.50 Pass 6550.00 3599.36 3608.34 -14049.50 19581.37 3586.69 2105.02 -13430.79 217.79 625.71 374.35 1251.35 1375.81 6,53 0691.50 Pass 6600.00 3602.13 3642.93 -14085.49 19581,37 3586.69 2105.02 -13430.79 217.84 671.54 371.04 130050 1423.85 6.77 05F1.50 Pass 6650,00 3604.49 3677.12 -14121.90 19581.37 3586.69 2105.02 -13430.79 218.88 717.39 367.79 1349.60 1471.87 7.02 OSF1.50 Pass 6700.00 3606.09 371053 -14159.06 19581.37 3586.69 2105.02 -13430.79 219.76 763.07 364.53 1398.55 1519.73 7.27 OSF1.50 Pass 6750.00 3806.95 3743.16 -14196.94 19581.37 3586.69 2105.02 -13430.79 220.47 805.56 361,26 1447.30 1567.39 7.53 OSF1.50 Pass 6800.00 3607,05 3774.97 -14235.51 1958137 358669 2105.02 -13430.79 221,04 853,84 357.98 1495.86 1614.86 7.79 OSF1.50 Pass 6850,00 3606.77 3806,38 -14274.43 19581.37 3586.69 2106.02 -13430.79 221.04 899.13 354.77 1544.36 1662.29 8.05 OSF1.50 Pass 6900.00 3606.48 383775 -14313.34 19581.37 3586.69 2105.02 -13430.79 221.04 944.65 35168 1592,97 1709.87 8.31 OSF1.50 Pass 6950.00 3606.20 3869,14 -14352.26 19581.37 3586.69 2105.02 -13430.79 221.04 990.38 34871 1641.67 1757.58 8.58 OSF1.50 Pass 7000.00 3605.91 3900.54 -14391.18 19581.37 3586.89 2105.02 -13430.79 221.04 2036.32 345.85 1000.47 1805.42 8.85 OSFI.50 Pass 7050.00 3605.63 3931.93 -14430.09 19581.37 3586.69 2105.02 -13430.79 221.04 2082.44 34310 1739,34 1853.38 9.13 OSF1.50 Pass 7100.00 360535 396332 -14469.01 19581.37 3586.69 2105.02 -13430,79 221.04 2128.74 34045 1788.28 1901.44 9.40 OSF1.50 Pass 7150.00 360506 3994.71 -1450793 1958137 3586,88 2105.02 -13430.79 221.04 2175.20 337.91 1837.29 1949.59 9.68 OSFI.50 Pass 7200.00 360478 4026.10 -14546.85 1958137 3586.69 2105.02 -13430.79 221.04 •2221.81 33546 1886,35 1997.85 9.96 OSF1.50 Pass 7250.00 3604.52 4057,33 -1458589 19581.37 3586.69 2105.02 -13430.79 220.06 2268.50 333,07 1935.43 2046.12 10.24 OSF1.50 Pass 7300.00 3604.36 408791 -1462545 19581.37 3586.69 2105.02 -13430.79 218.72 2315.03 33066 1984.37 2094.26 10.53 OSF1.50 Pass 7350.00 3604,28 4117.80 -14865.53 19581.37 3586.99 2105.02 -13430.79 217.51 2361.39 328.24 2033.15 2142.23 10.82 OSFI.50 Pass 7400.00 3604.23 4147.13 -14706,03 19581.37 3586.69 2105.02 -13430.79 217.08 2407.64 325.82 2081.82 2190.10 11.11 OSFI.50 Pass 7450.00 3804,19 4176.41 -14746.55 1958137 3586.69 2105.02 -13430.79 217.08 2454.02 323.48 2130.54 2238.04 11.41 OSF1.50 Pass 7500.00 3604.15 4205.70 -14787.08 1958137 3586.69 2105.02 -13430.79 217.08 2500.53 321.21 2179.32 2286.06 11.71 OSF1.50 Pass 7550.00 3604.10 4234.98 -14827.60 19581.37 3586.69 2105.02 -13430.79 217.01 2547.18 319.02 2228.16 233417 12.01 OSF1.50 Pass 7600.00 3604.06 4263.87 -14868.42 19581.37 3586.69 2105.02 -13430.79 215.96 259378 31685 2276.93 238221 12.31 OSF1.50 Pass 7650.00 3604.02 4292.03 -14909.73 18581,37 3586.69 2105.02 -13430.79 214.91 2640.18 314.66 2325.52 2430,08 12.62 OSF1.50 Pass 7700.00 3603.98 4319.48 -14951.52 19581.37 3586.69 2105.02 -13430.79 213.86 2686.40 312.44 2373.96 247778 12,93 OSF1.50 Pass 7750.00 3603.93 • 4346.19 -14993.79 19581.37 3586.69 2105.02 -13430.79 212.82 2732.41 310.20 242221 2525.28 13.25 OSF1.50 Pass 7800.00 3603.87 4372.18 -15036.50 19581.37 358669 2105.02 -13430.79 212.52 2778.24 307.94 2470.30 2572.62 13.57 OSF1.90 Paw 7850.00 3603.32 4398.23 -15079.18 19581.37 3586,69 2105.02 -13430.79 215.08 2824.22 305.76 2518.46 2620.06 13.90 OSF1.50 Pass 7900.00 3602.36 4424.50 -15121.71 19581.37 3586.69 2105.02 -13430.79 215.23 2870.44 30365 2568,762667.66 14.22 OSF1.50 Pass 7950.00 3601.40 4450.77 -15164,23 19581.37 3586.69 2105.02 -1343079 215.23 2916.78 308.96 2607,82 2710.46' OSF1.50 Pass 8000.00 3600,44 4477.05 -15206.76 19581.37 358669 2105.02 -13430.79 215.23 296324 307.13 i 2656.11 2758.16 14.51 OSF1.50 Pass 8050.00 3599.48 4503.32 -15249.29 19581.37 3586.69 2105.02 -13430,79 215.23 3009.81 305.36 2704,46 2805.91 14.83 OSF1.50 Pass 8100.00 3598,52 4529.60 -15291.82 19581.37 358669 2105.02 -13430.79 215.23 3056,49 303.63 2752.86 2853.74 15.14 OSF1.50 Pass 8150.00 3597,56 4555.87 -15334.35 19581.37 358669 2105.02 -13430.79 215.23 310328 301.95 2801.32 2901.65 15.46 OSF1.50 Pass 8200.00 3596.60 4582.15 -15376.88 19581.37 3586.69 2105.02 -13430.79 215.23 3150.16 300.32 2849.84 2949.62 15.78 OSF1.50 Pass 8250.00 3595.75 4008,35 -15419.46 19581.37 3586.69 2105.02 -13430.79 213.61 3197.11 298.72 2898.39 2997.63 18.10 0SF1,50 Pass 8300.00 3595.51 4634.12 -15482.30 19581,37 3586.69 2105.02 -13430.79 210,85 3243.99 297.11 2946.88 3045,59 16.43 OSF1.50 Pass 8350.00 3595.95 4859,43 -15505.42 19581.37 3586.69 2105.02 -13430.79 208.51 3290.77 295.48 2995.29 3093.45 16.76 OSF1.50 Pass 9400.00 3596.66 4684.57 -15548.63 19581.37 3586.93 2105.02 -13430.79 208.51 3337.58 29390 3043.68 3141.32 17.09 0SF1.50 Pass 8450.00 359736 4709.71 -15591.85 19581.37 3586.69 2105.02 -13430,79 208.51 3384.48 292.36 3092.12 3189.24 17.42 OSF1.50 Pass 8500.00 3598.07 4734.95 -15835.06 19581.37 3586.69 2105.02 -13430.79 208.51 3431.46 290.86 3140.61 3237.23 17.75 OSF1.50 Pass 8550.00 3598.77 4759.99 -1567828 19581.37 3585.69 2105.02 -13430.79 208.51 3478.53 289.40 3189.14 3285.27 . 18.08 OSF1.50 Pass 8600.00 3599.48 4785.13 -15721.49 19581.37 3586.69 2105.02 -13430.79 208.51 3525.68 28797 3237.71 3333.37 18.42 OSF1.50 Pass 8650.00 3600.18 481026 -15764.71 19581.37 3586.69 2105,02 -13430.79 208.51 3572.91 28658 3286.33 3381.53 18.76 OSF1.50 Pass 8700.00 360089 4835.40 -15807.92 1958137 3586.68 2105.02 -13430.79 208.51 3620.21 285.23 3334.99 3429.73 19.10 0SF1.50 Pass 8750.00 3601.59 4860.55 -15851.14 19581.37 3586.69 2105.02 -13430.79 208.74 3667.59 283.91 3383.69 3477.99 19.44 OSFI.50 Pass 8800.00 3602.13 4886.15 -15994.08 19581.37 358669 2105.02 -13430.79 210.56 3715.20 282.65 3432.54 3526.43 19.78 OSF1.50 Pass 8850.00 3802.39 4912.42 -15936.62 19581.37 3586.69 2105.02 -13430.79 212.20 376310 281.49 3481.61 3575.11 20.12 OSF1.50 Pass 8900.00 3602.54 4938.90 -15979.04 19581.37 358669 2105.02 -13430.79 212.20 3811.12 28037 3530.75 3623,88 20.46 OSFI.50 Pass 8950,00 3602.70 4965.37 -16021,45 19581.37 3586.69 2105.02 -13430.79 212.20 3859.19 279.29 3579.90 3672.67 20.79 OSFI.50 Pass 9000.00 3602.86 4991.84 -16063.67 19581.37 358669 2105.02 -13430,79 212,20 3907.31 278.23 3629.08 3721.50 21.13 OSF1.50 Pass 9050.00 3803.01 5018.31 -16106.29 19581.37 3586.89 2105.02 -13430.79 212.20 3955.48 277.20 367828 3770.35 21.48 OSF1.50 Pass 9100.00 3603.17 5044.78 -16148.71 19581,37 3586.69 2105.02 -13430.79 212.20 4003,69 276.19 3727.50 3819.23 21.82 OSF1.50 Pass 9150.00 3603.33 5071.25 -16191.12 19581.37 3586.69 2105,02 -13430.79 212.20 4051.94 275,20 3776.74 3868.14 22.16 OSF1.50 Pass 9200.00 3603.52 5097.86 -16233.46 19581.37 358669 2105.02 -13430.79 212.24 410028 274.25 3826.03 3917,12 22.50 OSF1.50 Pass 9250.00 3603.91 5125.13 -16275.36 19581.37 358669 2105.02 -13430.79 212.17 4148,85 273.36 3875.49 3966,28 22.84 OSF1.50 Pass 9300.00 360451 5153,10 -1631660 19581.37 3586.69 2105.02 -13430.79 211.93 4197.64 272.55 3925.07 4015.60 23.18 OSF1.50 Pass Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 9 of 12 • • Trajectory:SP28-NW3(P5)op4 Vs.SP33-W3L1(P1b) Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference TVD Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW Norlh Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (0) (0) (ft) (5) (ft) (ft) (ft) (°) (ft) (ft) (ft) (ft) 9350.00 3605.23 5181.79 -16357.75 19581.37 3586.69 2105.02 -13430.79 212.45 4246.63 271.83 3974.81 4065.09 23.51 OSF1.50 Pass 9400.00 3605.98 5211.18 -18398.19 1958137 3586.69 2105.02 -13430.79 212.87 429582 271.19 4024.63 4114.70 23.84 OSF1.50 Pass 9450.00 3606.78 5241.27 -16438.11 19581.37 3586.69 2105.02 -13430.79 213.16 4345.16 270.60 4074.56 4164.43 24.17 OSF1.50 Pass 9500.00 3607.61 5272.05 -16477.50 1958137 3586.69 2105.02 -13430.79 21526 439465 270.11 4124.54 4214.25 24.49 OSF1.50 Pass 955080 3608.48 5303.35 -18518.49 19581.37 3586.69 2105.02 -13430.79 213.24 444424 269.67 4174.58 4264,14 24.81 OSF1.50 Pass 9600,00 360934 5334.67 -16555.45 1958137 3586.69 2105.02 -13430.79 213.24 449385 26923 422461 4314.03 25.12 OSF1.50 Pass 9650.00 3610.20 5368.00 -16594.41 19581.37 3586.69 2105.02 -13430.79 21324 454346 26881 4274.65 4363.92 25.44 OSF1.50 Pass 9700.00 3611.04 5397.36 -16633.34 19581.37 3586.69 2105.02 -13430,79 214.54 4593.08 268.40 4324.68 4413.82 25.76 OSF1.50 Pass 9750.00 3611.80 5429.22 -16671.87 19581.37 3586.69 2105.02 -13430.79 218.80 464279 268.03 4374.76 4463.78 26.07 OSF1.50 Pass 9800.00 3811.80 5461.69 -16709.89 1958137 3586.69 2105.02 -13430.79 224.41 4692.59 267.74 4424.84 4513.76 26.38 OSF1.50 Pass 9850.00 3611.64 5494.76 -16747.40 1958137 358669 2105.02 -13430.79 232.37 4742.45 26750 4474.95 4583.79 26.69 OSF1.50 Pass 9900.00 3611.10 5528.41 -16784.37 19581.37 3586.69 2105.02 -13430.79 244.22 4792.36 26732 4525.03 4813.81 26.98 OSF1.50 Pass 9950.00 3610.21 5562.65 -16820.80 19581.37 358669 2105.02 -13430.79 262.38 4842.30 267.19 4575.11 4663.84 27.28 OSF1.50 Pass 20000.00 3608.94 5597.45 -16856.68 19581.37 3586.69 2105.02 -13430.79 287.77 4892.26 267.14 462513 4713.84 27,57 OSF1.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 10 of 12 • • Field: Nikadchuq Well: SP33-W3 Structure: Spy Island Borehole: SP33-W3 Slot SP33 Trajectory. SP33-W3 Client Eni Petroleum Type: Del Survey Coordinate System: NAD27 Alaska State Plane,Zone 04,US Feet North Reference: True Grld Convergence Angle: 008843614° Grid Scale Factor: 0999900149 Magnetic Declination: 20.419° Magnetic Declination Date: August 01,2012 Magnetic Model: 8GGM 2011 Reference Point NorthingEastlng ):levallog Structure Uno. Slot Uno 8053611.830(ftUS) 511434.430(ftUS) 54.100(ft)MSL 0.000(ft)(1 sigma) 0.1100(ft)(1 sigma) Traleotory Error Model:ISCWSAO 3-0 95.000%Confidence 2.7955 sigma Survevino Proo:As Drilled Description MD From(ft) MD To(ft) EOU Freq Survey Tool Type Hole Size(In) Casing Diameter(In) Borehole/Survey 0.000 40.820 1/98.425 SLB NSG+SSHOT-Depth Only-No Global 16.000 13.375 SP33-W3/SP33-003 40.820 41.000 Act-Stns SLB NSG+SSHOT-Depth Only-No Global 16.000 13.375 SP33-W3/SP33-003 41.000 648000 Act-Sins SLB_NSG+SSHOT-No Global 16.000 13,375 SP33-W3/SP33-W3 648.000 3404 890 Act-591s SLB MWD+GMAG-No Global 18.00013.375 SP33-003/SP33-W3 3404.890 10943.160 Act-Stns SLB_MWD+GMAG-No Global 12.250 9.625 SP33-W3/SP33-W3 10943,160 19484210 Act-Stns SLB_MVW+GMAG-No Global 8.750 5.500 SP33-W3/SP33-W3 19484.210 19544000 Act-Stns SLB_BLIND+TREND-No Global 8.750 5,500 SP33-003/SP33-W3 Minimum Allowable Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference ND Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (ft) (9) (ft) (ft) (8) (ft) (°) (ft) (ft) (8) (ft) Al local minima indicated. Results!tared:Depth 16450.00 ft<=MD c 25344.21 ft Results!tared:Ct-Ct separation 00 1500.00 ft Results highlighted:Ct-Ct separation<=1320.00ft 8400.00 359190 3504.86 -13941.17 954400 3571.74 2145.13 -13356.45 219.86 480.25 405.82 074.44 1209.38 5.48 OSF1.50 Pass 6450.00 3594.08 3539.24 -13977,41 9544.00 3571.74 2145.13 -13358,45 219.66 52631 401.84 124.47 1258.09 5.71 OSF1.50 Pass 6500.00 3596.60 3573.75 -14013.50 954400 3571.74 2145.13 -13358.45 218,28 572.66 39765 175.01 1307.23 5.94 OSF1.50 Pass 6550.00 3599.38 3608.34 -14049.50 9544.00 3571.74 2145.13 -13356.45 218.28 61927 393.58 225.70 1356.56 6.18 OSF1.50 Pass 880050 3602.13 3642.93 -14085.49 9544,00 3571.74 2145.13 -13356.45 218.34 688.08 389,69 276.39 1405.96 6.43 OSF1.50 Pass 8650.00 3604.49 3877.12 -14121.90 9544.00 3571.74 2145.13 -13356.45 219.70 712.88 38588 327.01 1455.30 6.67 OSF1.50 Pass 8700.00 3606.09 3710.53 -14159.06 954450 3571.74 2145.13 -13356.45 220.83 75950 382,03 377.47 1504.48 6.92 OSF1.50 Pass 8750.00 3606,95 3743.16 -14196.94 9544.00 3571.74 2145.13 -1335645 221.75 805.92 378.17 427.75 1553.48 7.18 OSF1.50 Pass 8800,00 3607.05 3774.97 -14235.51 9544.00 3571.74 2145.13 -13358.45 22248 852.12 37429 477.84 1602.27 7,44 OSF1.50 Pass 6850.00 3606.77 3806.36 -14274.43 9544.00 3571.74 2145.13 -13356.45 222.48 898.31 370.47 527.84 1651.00 7.70 OSF1.50 Pass 8900.00 3606.48 3837.75 -14313.34 9544,00 3571.74 2145.13 -13356.45 222.48 944.89 366,81 577.87 1699.82 7.97 OSF1.50 Pass 8950.00 3606,20 3869.14 -14352.26 9544.00 3571.74 2145.13 -13356.45 222.48 99124 383.31 627.93 1748.71 8.24 OSF1.50 Pass 7000.00 3605.91 3900.54 -14391,18 8544.00 3571.74 2145,13 -13358.45 22248 203796 359.94 678.02 1797.67 8.51 OSF1.50 Pass 7050.00 3605.63 3931.93 -14430.09 9544.00 3571.74 2145.13 -13356.45 222.48 2084.82 356.71 728.12 1846.69 8.79 OSF1.50 Pass 7100.00 3605.35 3963.32 -14469.01 9544,00 3571.74 2145.13 -13356.45 22248 213183 353.60 778.24 1895.77 9.06 OSF1.50 Pass 7150.00 360506 3994.71 -14507.93 9544.00 3571.74 2145.13 -13356.45 222.48 2178.98 350,82 828.36 1944.90 9.34 OSF1.50 Pass 7200.00 3600.78 4028.10 -14546,85 8544.00 3571.74 2145.13 -13356,45 222.48 222624 347.74 878.50 1994.09 9.63 OSF1.50 Pass 7250.00 3604.52 4057.33 -14585.89 9544.00 3571,74 2145.13 -13356.45 221.42 2273.58 344.95 928.61 2043.27 9.91 OSF1.50 Pass 7300.00 3604.36 4087.91 -14625.45 9544.00 357174 2145.13 -13358.45 219,97 2320.73 342.12 978.61 2092.32 10,20 OSF1.50 Pass 7350.00 360428 4117.80 -14865.53 9544.00 3571.74 2145.13 -13356.45 218,68 2387.73 339.26 2028.47 2141.23 10.49 OSF1.50 Pass 7400.00 3604.23 4147.13 -14706.03 9544.00 3571.74 2145.13 -13356.45 218.22 2414.62 336.39 2078.23 2190.03 10.79 OSF1.50 Pass 7450.00 3604.19 4176.41 -14746.55 9544,00 357174 2145.13 -13356.45 218.22 248181 333.82 2127.99 2238.87 11.10 OSF1.50 Pass 7500.00 3604.15 4205,70 -14787.08 9544.00 3571.74 2145.13 -13356.45 218.22 2508.72 330.94 2177.78 2287.76 11.40 OSF1.50 Pass 7550.00 3604.10 4234.98 -14827.60 9544,00 3571.74 2145.13 -13356.45 218.15 2555.94 328,35 2227.58 2336.70 11.71 OSF1.50 Pass 7800.00 360406 4263.87 -14868.42 9544,00 3571.74 2145.13 -13356.45 21703 2603.10 325.78 2277.31 2385.58 12.02 OSF1.50 Pass 7650.00 3604.02 4292.03 -14909.73 9544.00 3571.74 2145.13 -13356.45 215.93 2650.07 323.18 2326.90 2434.29 12.33 OSF1.50 Pass 7700.03 3603.98 4319.48 -14951.52 9544.00 3571.74 2145.13 -13356.45 214.83 2636.86 320.52 2376.34 2482.85 12.66 05F1.50 Pass 7750.00 3603.93 4348.19 -14993.79 9544.00 3571.74 2145,13 -13356,45 213.74 2743.45 317.84 2425.61 2531.23 12.98 OSF1.50 Pass 7800.00 3603.87 4372.18 -15036.50 9544.00 3571.74 2145,13 -13356.45 213.45 2789.86 315.12 2474.74 2579.45 13.32 OSF1.50 Pass 7850.00 3603,32 4398.23 -15079.18 9594.00 3571.74 2145.13 -13356.45 216.21 2836.41 312,51 2523,90 2627.74 13.65 OSF1.50 Pass 7900.00 3602.36 4424.50 -15121.71 9544.00 3571.74 2145.13 -1335845 216,37 2883,15 310.02 2573.14 2876.15 13.99 OSF1.50 Pass 7850.00 3601.40 4450,77 -15164.23 9544.00 3571.74 2145.13 -13356.45 216.37 2930.01 313.84 2818,17 2720.45 14.04 OSF1.50 Pass 8000.00 3600.44 4477.05 -15206.76 9544.00 3571.74 2145.13 -13356.45 216.37 2976.96 311.62 2865.34 2768.89 14.37 OSF1.50 Pass 8050.00 3599.48 4503.32 -15249.29 9544.00 3571.74 2145.13 -13356,45 216.37 3024.02 309.47 2714.55 2817.38 14.70 OSF1.50 Pass 8100.00 3598,52 4529.60 -15291.82 9544.00 3571,74 2145.13 -13356.45 216.37 3071.16 307.38 2763.79 2865.92 15.03 OSF1.50 Pass 8150.00 3597.58 4555.87 -15334.35 9544.00 3571.74 2145.13 -13356.45 216.37 3118.40 305.35 2813.05 2914.51 15,38 OSF1.50 Pass 8200.00 3596.60 4582.15 -15376,88 9544.00 3571.74 2145.13 -13356.45 216.37 3165.72 303.37 2862.35 2983.15 15,70 OSF1.50 Pass 8250.00 3595.75 4608.35 -1541916 9544.00 3571,74 2145.13 -13356.45 214.62 3213.10 301.44 2911.66 3011.81 16.04 OSF1.50 Pass 8300.00 3596.51 4634.12 -15462.30 9544.00 3571.74 2145.13 -13356.45 211.66 3260.40 299.48 2960.92 3080,42 16.38 OSF1.50 Pass 8350.00 3595.95 4659.43 -15505.42 9544,00 3571.74 2145.13 -13356.45 209.15 3307.62 29752 3010.10 3108.95 16.73 OSF1.50 Pass 8400.00 3596.66 4684.57 -15548.83 9544.00 3571.74 2145.13 -13356.45 209,15 3354,85 295.59 3059.26 3157.46 17,08 OSF1.50 Pass 8450.00 3597.36 4709.71 -15591,85 9544.00 3571.74 2145.13 -13356.45 208,15 3402,16 293.72 3108.44 3206.02 17.43 OSF1.50 Pass 8500.00 3598.07 4734.85 -15635.06 9544,00 3571.74 2145.13 -13356.45 209.15 3449.55 291.90 315765 3254.62 1778 05F1.50 Pass �r 8550.00 3598.77 4759.98 -15678.28 9544.00 3571.74 2145,13 -13356.45 209.15 3497.01 290.12 3208.89 3303.27 18.14 OSFI.50 Pass 8600.00 3599,48 4785.13 -15721.49 9544.00 3571,74 2145.13 -13356.45 209.15 3544.54 288.39 3258.15 335195 18.49 06F1.50 Pass 8650.00 3600.18 4810.26 -15764.71 9544.00 357174 2145.13 -13356.45 209.15 3592.14 286.71 3305,43 3400.67 18.85 OSF1.50 Pass 8700.00 3600.89 4835.40 -15807.92 9544.00 3571.74 2145.13 -13356.45 209.15 3639,80 285.07 3354.73 3449.42 19.21 OSF1.50 Pass 8750.00 360159 4860.55 -15851.14 9544.00 3571.74 2145.13 -13356.45 ' 209.40 3687.52 283.47 3404,08 3498.22 19.58 OSF1.50 Pass 8800,00 3602.13 4886.15 -15894.08 9544.00 3571.74 2145.13 -13356.45 211.32 3735.48 281.96 3453.50 3547.16 19.94 OSFI.50 Pass 8850,00 3602.39 4912/2 -15936.62 954400 3571.74 2145.13 -13356.45 213.09 3783.86 280,56 3503.10 3596.30 20.30 OSF1.50 Pass 8900.00 3802.54 4938.90 -15979.04 954400 357174 2145.13 -13356.45 213.09 383197 279.22 3552.75 3645,50 20.65 OSF1.50 Pass 8950.00 3602,70 4965.37 -16021.45 954400 3571.74 2145.13 -13356.45 213.09 3880.32 277.92 3602.40 3694.71 21.01 OSF1.50 Pass 9000.00 3602.86 4991.84 -18063.87 9544.00 3571.74 2145.13 -13356.45 213.09 3928.72 276.65 3652.06 3743.95 21,37 OSF1.50 Pass 9050.00 3603.01 5018.31 -16106.29 9544,00 3571.74 2145.13 -13356.45 213.09 3977.15 275,42 3701.74 3793.21 21.73 OSF1.50 Pass 9100.00 3603.17 5044.78 -18148.71 9544.00 3571.74 2145.13 -13356.45 213.09 4025,62 27421 3751.42 3842.49 22.10 OSF1.50 Pass 9150.00 3603,33 5071.25 -16191.12 9544.00 3571.74 2145.13 -13356.45 213.09 4074.13 273.03 3801.10 3891.78 22.46 OSF1.50 Pass 9200.00 3603.52 5097.88 -16233.46 9544.00 3571.74 2145.13 -13356.45 213.11 412271 271.89 3850.83 3941.13 22.82 OSF1.50 Pass 9250.00 3603,91 5125.13 -16275.36 9544.00 3571,74 2145.13. -13356.45 213.01 4171.50 270.83 3800,87 3990.62 23.18 05F1.50 Pass 9300.00 3604.51 5153.10 -16316.80 9544.00 3571.74 2145.13 -13356.45 212.72 4220.50 269.89 3950.61 4040,24 23.54 OSF1.50 Pass 8350,00 360523 518179 -1635775 9544.00 3571,74 2145.13 -13356.45 213.26 4269.88 28904 4000.64 4089.99 23.89 OSF1.50 Pass • • Drilling Office 2,8,572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 11 of 12 I • Trajectory'SP28-NW3(P5)op4 Vs.SP33-W3 ' Minimum Allowable • Traveling Cylinder Allowable Deviation from EOU-EOU Controlling Reference MD Reference ND Reference NS Reference EW Offset MD Offset ND Offset NS Offset EW North Azim Ct-Ct Distance Separation Reference Clearance OSF Rule Status (ft) (ft) (ft) (ft) (5) (ft) (8) (9) (') (ft) (0) (ft) (ft) 9400.00 360598 5211.18 -18398.19 9544.00 3571.74 2145.13 -1335645 213.71 4319.02 26830 4050.73 4139.83 24.23 OSF1.50 Pass 9450.00 3606.78 5241.27 -16438.11 954400 3571.74 2145.13 -1335645 214.00 4368.51 267.63 4100.88 4189.77 24.57 OSF1.50 Pass 9500.00 3607.61 5272.05 -16477.50 9544.00 3571.74 2145.13 -13356.45 214.08 4418.13 26708 4151.05 4239.75 24.90 OSF1.50 Pass 9550.00 3608.48 5303.35 -16516.49 9544.00 3571.74 2145.13 -1335645 214.04 4467.83 266.59 4201.24 4289.78 25.23 OSF1.50 Pass 9600.00 3609.34 5334.67 -16555.45 9544.00 3571.74 2145.13 -13356.45 214.04 451754 266.11 4251.43 4339.80 25.55 03F1.50 Pass 9650.00 3610.20 5368.00 -16594.41 9544.00 3571.74 2145.13 -13356.45 214.04 4567.26 265.65 4301.61 4389.83 25.88 OSF1.50 Pass 9700.00 3811.04 5397.36 -16633.34 9544.00 3571.74 2145.13 -13356.45 215.57 4616.98 285.19 4351.79 4439.86 26.21 OSF1.50 Pass 9750.00 3611.60 5429.22 -16671.87 9544.00 3571.74 2145.13 -13356.45 220.75 4666.78 264.80 4401.98 4489.92 26.53 OSF1.50 Pass 9800.00 3611.80 5461.89 -16709.89 9544.00 3571.74 2145.13 -13356.45 228.05 4716.64 26450 4452.15 4539.98 26.84 OSF1.50 Pass 9850.00 3611.64 5494.76 -16747.40 9544.00 3571.74 2145.13 -13356.45 239.32 4766.56 264.26 4502.30 4590.06 27.15 06F1.50 Pass 9900.00 3611.10 5528.41 -16784.37 9544.00 3571.74 2145.13 -13356.45 257.46 4816.51 264.10 4552.40 4640.11 27.45 06F1.50 Pass 9950.00 3610.21 5562.65 -16820.80 9544.00 3571.74 2145.13 -13356.45 284.70 4866.48 264.01 4602.47 4690.14 27.75 03F1.50 Pass 20000.00 3608.94 5597.45 -16856.68 9544.00 3571.74 2145.13 -13356.45 313.92 491645 264.00 4652.45 4740.12 28.03 OSF1.50 Pass End of results Drilling Office 2.8.572.0 Nikaitchuq\Spy Island\SP28-NW3\SP28-NW3\SP28-NW3(P5)op4 7/29/2015 7:15 AM Page 12 of 12 • • O O OO O O O V • o � N m.d%i I I + ;� r•,ill' 1•1. oj � � O f ! B4�F �t1Yf I�Z I �C CO Nte co • I . , 8 I q •QQ``c2 (n +-e �� /��f j f� N I 8 I kJ 1 1 �. ` °� °C1e• V a ' 1 - I ,,ii I„,,,,,. °i1BL, see , ¢4 a v I I p Ce'ifff M °�°I`"Ile I I I I M N -y [ Zi o �I o e�f of I I I8,� M o cite 641 • =Er N A I a "ie'4, a '9, s t I IP c)) oU_ I IY6 � IZ• N 0 �e Ni � � I I I ° I o II ii v �P a�a �8� I I I I I I co co °�, O I I 1—Ico 8 m m O y'Y.' 4 O W � 2W I ( I I I a I I I ~I _ ^ I I I `" " �P 704, °F I I I O 0 J O m oZo � z N °� I I I I aa. y 1 3 o I 44, 1 1 1 I 0 i N O m N 1 N �t , 1 I 1 1 Io Si o I I I I I I I I o t. E1 § I I I 1 I 1 'o E O 0 N I I I I I I Z e I 1l I I I I o O I O x I N O li N •c 7 N I I ly ; I I I girN o I I I I I I st CO N E � N I N JAI ”" N a3LL o I I I I I I I N a N mti I I I I I I I O f m t20 0 O o 0 0 0 0 0 0 ro o 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o O o 0 d —a_ O O m N . co l" 7 ro N CO (8)OOSI:I.=oleos(8)SN • Attachment 9 Casing Design Program 0 S File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 1 MINIMUM SAFETY FACTORS(13 3/8" Surface Casing) Depth(MD) OD/WeighUGrade Connection Minimum Safety Factor(Abs) (usft) Burst Collapse Axial Triaxial 1 0 13 3/8",68.000 ppf,L-80 N/A 2.50135 +100.00 Cl 8.08 B5 3.15 B5 2 10 i 2.51 65 +100.00 Cl8.13 B5 3.16 B5 3 10 ' 9.59 B11 +100.00 Cl 10.22 A5 6.34 A5 4 12 I 9.59B11 1 +100.00 Cl 10.23A5 6.34 A5 5 31 9.61 B11 +100.00 C1 10.31 A5 6.34 A5 6 300 9.66 B11 i 15.31 Cl r 11.73 A5 6.96 A5 7 300 j 9.66 611 15.30 Cl I 8.22 A5 6.60 A5 8 763 9.74 B11 6.03 Cl 1 6.05 A5 6.11 Al 9 7631 j 9.74 B11 If 6.03 Cl ! 6.04 A5 6.10 Al 10 1000 9.78B11 4.63 Cl j 6.44 A5 6.25 Al 11 10941 9.79 B11 4.25 01 I 6.61 Al 6.33 Al 121200 9.81 B11 3.89 Cl 1 6.74 Al 6.42 Al 13 1394 9.84 B11 3.39 Cl 7.01 Al 6.62 Al 14 1800 9.90 B11 2.68 Cl 7.71 Al 7.13 Al 15 1932! 9.92 B11 2.51 Cl (7.41)Cl 6.04 Cl 16 20479.94 611 2.39 Cl (5.59)Cl 5.34 01 17 2051' 9.94 B11 2.38 Cl (5.54)Cl 5.32 Cl 18 2051 9.94 B11 2.38 C1 (5.52)Cl 5.30 C1 19 2200 9.96 B11 2.24 C1 (5.42)Cl 5.07 Cl 20 2200 9.96 B11 i 2.24 Cl (5.43)Cl 5.07 Cl 21 2300 9.97 B11 2.16 Cl (5.36)Cl 4.93 Cl 22 2371 9.98 B11 2.10 Cl (5.14)Cl 4.75 C1 23 2400 9.99 B11 2.08 Cl 1 (5.05)Cl 4.69 Cl 24 2400 9.99 B11 2.08 Cl (5.04)Cl 4.68 Cl 25 2404 j 9.99 B11 2.08 Cl (5.04)Cl 4.68 Cl 26 2463 ( 9.99 B11 2.04 Cl ! (5.02)Cl 4.62 01 27 2500 10.00 B11 1 2.02 C1 (5.00)Cl 4.58 C1 28 2600 10.01 B11 1.96 Cl ( (4.96)Cl 4.48 Cl 29 2700 10.02 B11 I 1.91 Cl I (4.92)Cl 4.39 Cl 30 2700 10.02 B11 ' 1.91 Cl (4.91)Cl 4.39 Cl 31 2783 10.03 B11 l 1.87 Cl (4.86)Cl 4.31 Cl 32 2784 10.03 B11 1.87 Cl (4.86)Cl 4.31 Cl 33 34 B Pressure Test 35 B11 Fracture @ Shoe w/1/3 BHP at Surface ! ! 36 Cl Full/Partial Evacuation 37 Al Running in Hole-Avg.Speed 38 A Green Cement Pressure Test(Axial) 39 0) Compression ' 1 40 SP28-NW3 StressCheck 5000.1.10.0 Build 1934 I File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 2 BURST LOADS DATA(13 3/8"Surface Casing) Drilling Load: Pressure Test Test Pressure: 2000.00 psi Mud Weight: 9.50 ppg Plug Depth, MD: 10.0 usft Assigned External Pressure: Fluid Gradients (w/Pore Pressure) Drilling Load: Fracture @ Shoe w/1/3 BHP at Surface Surface Pressure (1/3* BHP): 524.39 psi Shoe Depth, MD: 2784.0 usft Fracture Pressure at Shoe: 1598.55 psi Fracture Margin of Error: 0.00 ppg External Pressure: Fluid Gradients(w/Pore Pressure) TOC, MD: 31.0 usft Prior Shoe, MD: 0.0 usft Mud Weight Above TOC: 9.50 ppg Fluid Gradient Below TOC: 8.60 ppg Pore Pressure In Open Hole: No SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 3 BURST DESIGN(13 3/8" Surface Casing) + Design Load Line x Pipe Rating 200— - + 400 - 600— - + 1 J L 1 J L 800 I I 1000 I I I 1200 I I I I I I I I I I 1400 + I I I I 1600— -� � I � I I Q , I I I 0 1800 I I I I � i I 05 2000 2200 2400— ---t 2600-----� - 2800 + 1 J L x L - I I I I 1 J L 1 J L 3000 3200 - I 3400 . - I I I 3600 I I I I I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 Burst Rating (psi) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 4 COLLAPSE LOADS DATA(13 3/8" Surface Casino) Drilling Load: Full/Partial Evacuation Mud Weight: 9.50 ppg Mud Level, MD: 2784.0 usft Assigned External Pressure: Fluid Gradients (w/Pore Pressure) External Pressure: Fluid Gradients(w/ Pore Pressure) TOC, MD: 31.0 usft Prior Shoe, MD: 0.0 usft Fluid Gradient Above TOC: 9.50 ppg Fluid Gradient Below TOC: 9.50 ppg Pore Pressure In Open Hole Below TOC: No SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 5 COLLAPSE DESIGN (13 3/8"Surface Casing) 0T x + Design Load Line x Pipe Rating 200 400— - 600 - 800 1 J L 1 J L - I I I I I 1 000 - 1 I � 1200 1 L - I 1400 + - I S 1600 - I � I I m 0 1800 I I co I I >✓ I I � I I 2000 T r T 7 r - 2200— 2400 - 2600— - - 2800 1 J . L 1 x J L - I I I 1 3000 I I I 3200 - 1 3400 - I I I I I I I I I 1 3600 0 400 800 1200 1600 2000 2400 2800 3200 3600 Collapse Rating (psi) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 6 AXIAL LOADS DATA(13 3/8"Surface Casino) Running in Hole-Avg. Speed: 0.0 ft/s Overpull Force: 0 lbf Pre-Cement Static Load: Yes Pickup Force: 0 Ibf Green Cement Pressure Test: 1000.00 psi Service Loads: Yes SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • s File: SP28-NW3 (P5) op4 Date:July 28, 2015 Page: 7 AXIAL DESIGN (13 3/8"Surface Casing) 0x r , + Design Load Line x Pipe Rating 200— 400 600 800 L + L 1 1 J I I I I 1000 1 I I I I I 1 I 1200 + L 1 a I I I I 1 I I 1400 + -' 1 1 1600 t t L 1 I Q 0 1800 +- T Y , - , V I I 2>_ 1 I 2 2000— T T , , 2 + 2200 + 2400— 2600— - 2800 + 1 1 1 J x / O I I 3000L L 1 1 , , I I I I I I L 1 • J -I 3200 I I 3400 i - I 3600 I I II I 0 300000 600000 900000 1200000 1500000 1800000 2100000 2400000 2700000 Axial Force (lbf) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 1 MINIMUM SAFETY FACTORS(9 5/8" Intermediate Casing) Depth(MD) OD/Weight/Grade Connection Minimum Safety Factor(Abs) (usft) Burst I Collapse Axial Triaxial 1 0 9 5/8",40.000 ppf,L-80 N/A 2.86 B5 +100.00 Cl 4.82 B5 3.50 B5 2 10 2.87 B5 +100.00 Cl 4.84 B5 3.51 B5 3 10 10.98811 +100.00 Cl: 5.18 A5 5.36 A5 4 12 { 10.98 B11 +100.00 Cl 5.18 A5 5.36 A5 5 300i 10.91 B11 20.43 Cl 5.54 A5 5.57 A5 6 3001 10.91 B11 20.43 Cl 4.84 A5 5.11 A5 1 7 763 10.79 B11 8.10 Cl I 4.30 A5 4.67 A5 8 1000 10.73 B11 6.24 Cl 4.50 A5 4.81 A5 9 1200 10.68 B11 5.25 Cl 4.67 A5 4.94 A5 10 1300 10.66B11 4.88 C1 5.79 Al 5.23 Al 11 1394 10.64811 4.58C1 5.79 Al 5.52 Al 12 1800 10.55 B11 3.64 Cl 5.82 Al 5.49 Al 13 1976, 10.51 B11 3.35 Cl 5.85 Al 5.08 Cl 14 20511 I 10.50 811 3.24 C1 5.33 A5 4.92 C1 15 20511 10.50 B11 3.24 Cl 5.31 A5 4.91 Cl 16 2200 10.47 B11 3.05 Cl 5.47 A5 4.80 Cl 17 22001 10.47 B11 3.05 C1 5.48 A5 4.80 Cl 18 2300 10.45 B11 2.94 C1 5.58 A5 4.72 C1 19 24001 10.43 B11 2.84 Cl 5.47 A5 4.55 Cl ' 20 2500 10.41 B11 2.75 Cl 5.57 A5 4.49 Cl l 21 2600 10.39 B11 2.67 C1 5.66 A5 4.43 C1 22 2700 10.38 B11 2.60 Cl 5.75 A5 4.38 C1 23 2784! 10.36 B11 I 2.55 C1 5.80 A5 4.33 C1 24 2800 10.36 B11 ! 2.54 Cl 5.81 A5 4.32 Cl 25 2800 10.36 B11 I 2.54 C1 5.83 A5 4.33 Cl 26 2900 10.35 811 1 2.49 Cl 5.91 A5 4.28 Cl 27 2900 10.35 B11 2.49 C1 5.92 A5 4.28 C1 28 3000 10.33 B11 2.44 C1 5.99 A5 4.24 Cl 29 3100 j 10.32 B11 2.40 Cl 6.06 A5 4.20 Cl 30 32001 I 10.31 B11 2.36 Cl 5.66 A5 4.03 Cl 31 3200 10.31 B11 2.36 Cl 5.67 A5 4.03 Cl 32 3300 10.30 B11 2.33 Cl 5.72 A5 4.01 Cl 33 3300 10.30 B11 2.33 Cl 5.71 A5 4.00 Cl 34 3400 10.30 B11 2.31 Cl 5.75 A5 3.98 Cl 35 3400 10.30 B11 2.31 Cl 5.76 A5 3.99 Cl 36 35001 10.29 B11 2.29 C1 5.79 A5 3.97 C1 37 3600 10.29 B11 I 2.27 C1 5.82 A5 3.95 Cl 38 3700 i 10.28 B11 2.26 Cl 5.84 A5 3.94 Cl 1 39 3837 i 10.28 B11 2.25 Cl 5.85 A5 3.93 Cl 40 3837 10.28 B11 2.25 Cl 6.30 Al 4.88 Cl 41 12700, 10.20 B11 2.03 C1 6.93 Al 4.08 C1 42 128001 10.20 B11 2.02 C1 6.94 Al 4.07 C1 1 43 12900 10.20 B11 2.01 Cl 6.94 Al 4.06 Cl 44 13000 10.19 811 ! 2.00 Cl 6.95 Al 4.05 Cl 45 13200 10.18 1311 8 10.15 B11 1 91Cl 4613845 7.13 Al 4.23 Cl ' 47 1469 9.98 B11 1.81 Cl 8.06 Al 3.57 Cl 48 1470 9.98 B11 1.81 Cl 8.06 Al 3.57 Cl 49 1470 9.98 B11 1.81 Cl (7.48)Cl 3.57 Cl 50 147741 j 9.96 B11 1.81 Cl (7.45)Cl 3.56 Cl 51 14900 9.94 B11 1 1.80 Cl (7.39)Cl 3.54 Cl 52 14900 9.94 B11 � 1.80 Cl (7.44)Cl 3.54 Cl 53 15100 9.91 611 1.78 Cl (7.40)Cl 3.52 Cl 54 1530 9.89 811 1.77 Cl (7.36)Cl 3.50 Cl 55 153001 1.77 Cl (7.37)Cl 3.50 Cl 56 155001 9.87 611 1.76 Cl (7.33)Cl 3.49 C1 57 15687. 9.86 B11 i 1.76 Cl I (7.29)Cl 3.48 Cl i 58 15710 . 9.86 B11 1.76 Cl (7.28)Cl 3.48 Cl 59 15710 9.86 B11 1.76 Cl 10.82 Al 3.91 Cl 60 15800 I 9.85 B11 1.75 Cl 11.18 Al 3.90 Cl 61 16409 9.83 B11 1.74 Cl 12.12 Al 3.88 Cl 62 16410 9.83 B11 1.74 Cl 12.12 Al 3.88 Cl 63 64 65 Pressure Test 65 B11 Fracture @ Shoe w/1/3 BHP at Surface 66 Cl Full/Partial Evacuation 67 Al Running in Hole-Avg.Speed I SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 2 MINIMUM SAFETY FACTORS(9 5/8" Intermediate Casing) Depth(MD) OD Weight/Grade Connection Minimum Safety Factor(Abs) (usft) Burst L Collapse I Axial Triaxial 68 A5 Green Cement Pressure Test(Axial) I 69 O Compression I } '70 ! / SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 3 BURST LOADS DATA(9 5/8" Intermediate Casino) Drilling Load: Pressure Test Test Pressure: 2000.00 psi Mud Weight: 9.50 ppg Plug Depth, MD: 10.0 usft Assigned External Pressure: Fluid Gradients (w/ Pore Pressure) Drilling Load: Fracture @ Shoe w/1/3 BHP at Surface Surface Pressure (1/3* BHP): 522.91 psi Shoe Depth, MD: 16410.0 usft Fracture Pressure at Shoe: 2341.11 psi Fracture Margin of Error: 0.00 ppg External Pressure: Fluid Gradients(w/Pore Pressure) TOC, MD: 13845.0 usft Prior Shoe, MD: 2784.0 usft Mud Weight Above TOC: 9.50 ppg Fluid Gradient Below TOC: 8.60 ppg Pore Pressure In Open Hole: No SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 4 BURST DESIGN (9 5/8"Intermediate Casino) 0 T x + Design Load Line x Pipe Rating 1000 2000-- + - 3000---+- 4000 + L L 1 1 J I I 5000 L L 1 1 I I I I 6000 L 1 J 7000 4 I 1 I 8000 r r t o. 1 I 0 9000 V I co N L I 1 � I N 10000 r r T 2 11000 12000 13000 14000 + L L L J + 15000 L L 1 1 J J 16000— I- J I t I I 17000 I I I I 18000 1 I i 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Burst Rating (psi) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 5 COLLAPSE LOADS DATA(9 5/8"Intermediate Casino) Drilling Load: Full/Partial Evacuation Mud Weight: 9.50 ppg Mud Level, MD: 16410.0 usft Assigned External Pressure: Fluid Gradients (w/Pore Pressure) External Pressure: Fluid Gradients(w/Pore Pressure) TOC, MD: 13845.0 usft Prior Shoe, MD: 2784.0 usft Fluid Gradient Above TOC: 9.50 ppg Fluid Gradient Below TOC: 9.50 ppg Pore Pressure In Open Hole Below TOC: No SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 6 COLLAPSE DESIGN(9 5/8" Intermediate Casino) 0-- x + Design Load Line x Pipe Rating 1000 2000 3000 4000 L 1 1 1 J I I 1 I 5000 L 1 1 1 J J 1 I I I 6000 7000 i I co I I r r ti 11EE I I 11000— 12000 13000 14000 L 1 1 1 J I I 15000 L L 1 1 I I 16000 + x 17000 i I 18000 I I 1 I T 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Collapse Rating (psi) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4` Date:July 28, 2015 Page: 7 AXIAL LOADS DATA(9 5/8" Intermediate Casing) Running in Hole-Avg. Speed: 0.0 ft/s Overpull Force: 0 lbf Pre-Cement Static Load: Yes Pickup Force: 0 lbf Green Cement Pressure Test: 1000.00 psi Service Loads: Yes SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • File: SP28-NW3 (P5) op4* Date:July 28, 2015 Page: 8 AXIAL DESIGN(9 5/8" Intermediate Casing) 0 r L: + Design Load Line \ Pipe Rating 1000 J' 2000 3000 4000 + L 1 1 J 5000 L 1 1 J J 6000 1 J 7000 I I 8000 r t N 9000 D I >✓ I ai 10000 r T 2 11000 - 12000 13000 14000 + L 1 1 J r I 15000 1 L 1 1 J J 16000— 1 + 'x t + 17000 I I I 18000 I I I 0 300000 600000 900000 1200000 1500000 1800000 2100000 2400000 Axial Force (lbf) SP28-NW3 StressCheck 5000.1.10.0 Build 1934 • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • • TRANSMITTAL LETTER CHECKLIST WELL NAME: /ii IscAl PQ — iU L.Y PTD: XS -I Yi I/Development _Service Exploratory Stratigraphic Test _Non-Conventional FIELD: /U r A4 4tI� POOL: Al,KAL-kl, `CACI 1 1�uW 3AA ? i-- l Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements /Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, /Per curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 0 0 El El N N N: a) o r N -Cr)▪ C O: N: C J. V: g: ' e ; , , , 0) C' C a' ;, , ; , , , , , 0 , r o, �: , , , , , �': =1 , y m N- o, 7' ca E' O p O: as a E Lo: ' C Di 05' E O Q: CD: o o ' ° , ' •a ° o a U ' L: H :! 1H a m co M: rn �: o: m: 3 s: m' _o , E' c a; o o, v o �': a ' E 3, a, cn j Z ao O g, `' E ,Eo, , WM' ' 1°' i 0 , o; ` aE ? ° .ar ' oyDN LCN0o : ( ' EN. : W, a 03C•ca as ' p. I cu 2 rs: W: c. ra C' 0, c N, �' ��': OOp: N. L, O N, , -0 o: �: co -_ w o' • 3' 3: ° �: LO N Q '.:: >': _: p� ' ,o ': � o. C L) v aa)i, Q� , 0. p, N: °� �: ; •O; 4 , o, co Z CS O W: (U): N .C: E: , , N, �: U' ° d' ai o �: � �: N, � o .. m E. as' , 3' c aa,a. a 2, o a x. y: E., E N _N: 6 I o as ' 3, 7, a t. Cl) G •a o' W O' 0, '-i-,i L: •N', ' N, `' ' O' O' U' .0 a)' y' €' ,-' O w: ' G O t a3 U: a w N, C' °r O w II: C, Z CO, 0••: H cc, cc) ' O: pc: ._ . _ "O N: CO 0 N: o: o a: . C': . 0: O •CV Q� CO: CO, ' �: U CO M. a0. =, U: t: y 'X. (D: x' o, (: ' CO: CO. a . >. j Z 0: Y. `1_ Q: 0: , a), O: O. M. l j• O. 1. N O >: N: p: Q: . N N X �: W ' Q' Z' 2' 0' 0' ' �' N' Z' ,' ay m' m .a rn a 'v' 2. 0 2' I' 1. W' a , , , , , >� . ' W ' a . < a), a), a), a), a), a), a), Cl)), a), a), a), a), < < < <, a), <' Cl)), o, a), a), a), <, a), a), aa)), Cl)), a), a), a), o, Q; aa)), a), Q, a, a, 1 p. Z >- >- >- >- >- >- >-, >- >- >- >-, >- Z Z Z Z >- Z, > Z >- >- >- Z > Y >- >-, >- >- > Z Z >-, >- Z Z Z, C O 1 mTa mo C. ' E, m: a): c ° c L: o: E O. C: N, o O. M: (L O' w �': ' �' c' c' . tLits O. Z: �: w' ' 0 Nal ct as W : O. C �. a) tQ, O . : ..1 O1 C 7 . 4)' 2 C: : v: a .O' a): 'r: . as 8' ' o: ' a) p: N: co: ' 't O' c: ' o' _ 'C: L6 iA y: `p. a. .j N, !=•: 7: . `t. C. E: .0. . N m: °. > C ' ay E. N: . a c O) ' 'C O ' 3 0, 'O: g. M: >' 0 ; .N' a_ , a. O: —, a 0. . a'. -, o: ; N: N 0) a) : ), N 3' O >' C. O) .C' °d: ' C U) �, OL o, �: 3' <' 0. a cv N N (1)' 4,.. D) CJ t: �' �: u is 2' 0 ° O(1 oG,, y, C' ONo a c > m ° : . a' w.• ' Lec' ' oS ma ) U c) EEc. vcc E ,- a, o or) Ccy Fc o of .... C 0 � aN .0 c c 1= Z oov ° a) cQ , orn 7, U o. _ a a, Li o; '-, a, o 3 0 (g: m u?' T .N,,'c a) c -O Y6 : s Q. N' N a oO) �, , N y 0 1:i 08 8 a) ._ o > > , a 0 N . Y0: .0 `OO2a) O E, mEC: 3 .°' am' 3 ..-' dS EU m °. , - Ooa) c' a)' : -' . ° : o E - T 4 ' o' ) t % mZ 11,) °' : : - ia. m - .c. s: ay , '7: : 0. m' 8 .S a) 4- .- O: rn co a 3' O . O: ' c E (ap C: m Oa' 4 ° w3 -O: a)' 0O: �' N: ' ` N' C N: co, GN. t, op, y: o r-' =, , C' ' >,' , WO o Z 'a yy ' 0 3 3, a)' ,' 0: :3 N . .- 3fa 2 O 4 d y 4 ' NoNa) .2 U > .` 0' j a : OOa) O' aa d o7 (a ' 0 -c o � 2 c: t~: v: v: >: 4, a): 0 a: v' O a, � Oc: oa) O. c' Q , , a. v: EO) a) o : en c. v' a N: a a a QNa c° -8 � � oUO. >: >' a C' VU: . O' Y. : Om tOC' ' : 4N, C 'OamaO) .-: . 7C0 O' 023 ata Na a a C. ONN' a L. a): aYaD . N: oSC ' N: �. N Oc. t'n 'O W U (VE: OO (a3. a) Ny .y0 Cm' a g' ss' o' NY (u. „00, . p >,. ..,,Ti Z: C' .NT O. a Tu (1 42 N c .ca a ` y > a) aa) 3, c: 11ca " 'OO- OO' CN' Q` a .2: pVQ8. y. a) : a LL 0 0- .0 .0 -O 'OU • CN . .0. � -O . NcyN' 'aO) O). o. .N! � L. c). (.,D N . 0 ' O, C asCEpNCootiN CO NENNNNN .6p: L: c o �. 3U ` o, m ' v _' } �' 4cN' c' Nm p' cmm _., vc av v v ` o ° °' v co , ' 3m - a E' — m . ' o � 'v � • W ) a oo' ' o a U > >' ' > > rn Lu Nm' a N, CDci 0, ` c ` •J I E - = a) Na) €, €. - 3 ccc, t. F -' 1 ' y, y , y°, 3 � p0 € com Cra o . >, m ,..DC, •c ...,76 ...,T) cva ° a) a' m, m; mo, O =, 22mv' f6, -o' v - 0, O: t: °, a), ma) a)' o' 0 ✓ c aJ0: 5, 5, 5 (0: �' OOa: a., 0, 5 ¢, a, Z0, u), 000, U, a "' Q' ", �' mm: U: 5 ", 2aa, u): u) U' W 2. CO N M In (O N. CO O) O .— N M v tl) CO N. CO Q) O '— N M •v (n O i CO O) 2 E N M V• to (O N CO 0") N N N N N N N N N N M M M M C") M M M M M • U (() I 2- 0 C a+ (N 0 0 N ° 0 Et VV 0 6 0 O) 6 N B p `- p N WM is M M 0 N Ea `aT JNC a) co O J a m .E a (n O a m 0 Lii o v a s c a0 a) Qa • a ¢ a W Q 0 Q • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of infor I nation. Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: October 19, 2015 Surface Data Logging End of Well Report SP28-NW3 SP28-NW3 L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Mud Record 7. Bit Record 8. Morning Reports 9. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SP28-NW3 & SP28-NW3 L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23556-00-00 (SP28-NW3) 50-629-23556-60-00 (SP28-NW3 L1) Sperry Job Number: AK-XX-0902655934 (SP28-NW3) AK-XX-0902750623 (SP28-NW3 L1) Job Start Date: 08 August 2015 Spud Date: 09 August 2015 Total Depth: 24986’ MD, 3552’ TVD (SP28-NW3) 23200’ MD, 3584’ TVD (SP28-NW3 L1) North Reference: True Declination: 18.766° Dip Angle: 81.095° Total Field Strength: 57498.267 nT Date Of Magnetic Data: 16 September 2015 Wellhead Coordinates N: North 70° 33' 27.75728" Wellhead Coordinates W: West 149° 54' 20.98248" Drill Floor Elevation 53.46’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: Rebecca Mulkey, Kori Jo Plowman, Gregory Dellner, A. Paul Kalenuik, Lesley Hunter, Sonny Tiger SDL Sample Catchers: Enoc Velez-Martinez, Kyle Blazian Company Geologist: Josh Zuber Company Representatives: Jack Keener / Mike Ross / Bruce Simonsen / Oliver Amend / Mike Grubb / Russ Wimmer SSDS Unit Number: 110 DAILY SUMMARY 08/07/2015 SDL continues on location from previous well. Skid rig floor into drilling position. Rig up operation in preparation for pre-spud acceptance. 08/08/2015 Continue rig up operation in preparation for pre-spud acceptance. 08/09/2015 Install Diverter. Pick up BHA. Drill out conductor to 160’ MD. Pull out of hole and pick up BHA#2. Drill to 889' MD. Gas: Max gas detected was 4 units Fluids: No losses reported 08/10/2015 Drill from 889' MD to 2755' MD. Gas: Max gas while drilling was 694 units Fluids: No losses reported 08/11/2015 Drill from 2755’ MD to 2808’ MD. Circulate. Back ream out of hole to 349’ MD. Lay down BHA. Run in hole with 13 3/8” casing to 948’ MD. Gas: Max gas while drilling was 118 units. Max gas while backreaming was 293 units Fluids: No losses reported 08/12/2015 Run in hole with casing to 2788' MD. Cement casing. Nipple down diverter system. Begin nippling up BOP stack. Gas: Max gas detected was 4 units Fluids: No losses reported 08/13/2015 Nipple up BOP. Install blind rams. Service top drive. Set test plug. Pick up and rack back 5” drill pipe. Install new flow line. Continue to rack back 5” drill pipe. Gas: No significant gas data. Fluids: No losses reported 08/14/2015 Pick up 5" drill pipe. Test BOPE. Test casing. Service top drive. Make up BHA. Run in hole to 2623' MD. Wash down to 2704 MD'. Drill out shoe track to 2780’ MD. Gas: No significant gas data. Fluids: No losses reported 08/15/2015 Drill out shoe track. Pull out of hole. Lay down BHA. Pick up and make up BHA and run in hole to 1560' MD. Perform shallow hole test. Run in hole and wash down to 2808' MD. Drill 20' of new hole and displace to LSND. Slip and cut drilling line and circulate bottoms-up. Perform FIT. Drill ahead to 3150' MD. Pull out of hole to 2775' MD to change out saver sub. Gas: Max gas while drilling was 65 units. Fluids: No losses reported Geology: 90% Sandstone: brown-light brown-grey-green, fine-medium grained, sub rounded- sub angular, poorly sorted, unconsolidated, trace glauconite. 10% Shale 08/16/2015 Change out saver sub. Run in hole from 2775’ MD to 3150’ MD. Drill ahead to 5370’ MD. Gas: Max gas while drilling was 129 units. Fluids: 28 bbls lost to formation Geology: 60% Sandstone: transparent-translucent-brown-light brown-grey-green, fine-medium grained, sub rounded-sub angular, moderate-poorly sorted, unconsolidated, trace glauconite, rare mica. 20% Clay 20% Siltstone 08/17/2015 Drill from 5370’ MD to 7725’ MD. Gas: Max gas while drilling was 37 units. Fluids: 51 bbls lost to formation Geology: 100% Sandstone: transparent-translucent-brown-light brown-grey-green, fine-very fine grained, sub rounded-sub angular, well sorted, unconsolidated, trace glauconite, rare mica. 08/18/2015 Drill from 7725’ MD to 10,010 MD’. Gas: Max gas while drilling was 16 units. Fluids: 26 bbls lost to formation Geology: 100% Sandstone: transparent-translucent-brown-light brown-grey-green, fine-very fine grained, sub rounded-sub angular, well sorted, unconsolidated, rare mica. 08/19/2015 Drill from 10,010’ MD to 12,305’ MD. Gas: Max gas while drilling was 24 units. Fluids: 58 bbls lost to formation Geology: 100% Sandstone: transparent-translucent-brown-light brown-grey-green, fine-very fine grained, sub rounded-sub angular, moderately-well sorted, unconsolidated, trace pyrite, rare mica. 08/20/2015 Drill from 12,305’ MD to 14,260’ MD. Gas: Max gas while drilling was 99 units. Fluids: 160 bbls lost to formation Geology: 80% Sandstone: transparent-brown-light brown-grey-green-black, fine-very fine grained, sub rounded-sub angular, moderately-well sorted, unconsolidated, trace pyrite, 20% Siltstone 08/21/2015 Drill from 14,260’ MD to 16,313’ MD. Gas: Max gas while drilling was 462 units. Fluids: 174 bbls lost to formation Geology: 90% Sandstone: transparent-grey-green-black, fine-very fine grained, sub rounded- sub angular, well sorted, unconsolidated, trace pyrite. 10% Siltstone 08/22/2015 Drill from 16,313’ MD to 16,562’ MD. Circulate bottoms-up. Back ream out of hole to 11,649’ MD. Gas: Max gas while drilling was 529 units. Max gas while backreaming was 462 units. Fluids: 55 bbls lost to formation Geology: 70% Sandstone: transparent-brown-grey-green-black, fine-very fine grained, sub rounded-sub angular, well sorted, unconsolidated, rare pyrite, rare mica. 30% Siltstone 08/23/2015 Back ream out of hole from 11,649’ MD to 4,740’ MD. Gas: Max gas while backreaming was 22 units. Fluids: 65 bbls lost to formation 08/24/2015 Back ream out of hole from 4,740’ MD to 1,658’ MD. Pulled out of hole to 444’ MD and laid down BHA. Prepped to run in hole with 9-5/8” casing. Gas: Max gas while backreaming was 24 units. Fluids: 64 bbls lost to formation 08/25/2015 Float in hole with 9-5/8" casing from surface to 9800' MD. Gas: Max gas was was 49 units. Fluids: 0 bbls lost to formation 08/26/2015 Float in hole with 9-5/8" casing from 9800' MD to 16552’ MD. Prepping to fill casing and circulate. Gas: Max gas was 10 units. Fluids: 8 bbls lost to formation 08/27/2015 Fill casing, circulate and condition mud, cement hole. Gas: Max gas while circulating was 61 units. Fluids: 0 bbls lost to formation 08/28/2015 Finish cementing. Nipple up. Test BOP. Calibrate the Total Hydrocarbon Analyzer and Gas Chromatograph. Pressure testing casing to 3000psi. Gas: Max gas was 10 units. Fluids: 0 bbls lost. 08/29/2015 Cut and slip drill line. Lay down 122 stands of 5" drill pipe. Picked up 4.5" DP. Gas: Max gas was 6 units. Fluids: 0 bbls lost. 08/30/2015 Pick up 170 stands of 4.5" drill pipe. Pick up BHA. Trip in hole from surface to 3200' MD. Rig crew conducted kick while tripping drill. Gas: Max gas while tripping was 11 units. Fluids: 0 bbls lost. 08/31/2015 Trip in hole from 3200' MD to 16400' MD. Displace with oil based mud. Slip and cut drill line. Gas: Max gas while tripping was 6 units. Fluids: 0 bbls lost. 09/01/2015 Slip and cut drill line. Drill out shoe. Drill out rat hole. Formation Integrity Test to 13.00ppg EMW. Drill ahead from 16582' MD to 18014' MD. Gas: Max gas while drilling was 783 units. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone: transparent, white-brown-dark grey-green-black, fine-very fine grain, sub rounded-rounded, well sorted, unconsolidated, rare mica, abundant glauconite. 09/02/2015 Drill from 18014' MD to 20070' MD. Monitor well for losses. Gas: Max gas while drilling was 884 units. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone: transparent, white-brown-dark grey-green-black, fine-very fine grain, sub rounded-rounded, well sorted, unconsolidated, trace mica, abundant glauconite. 09/03/2015 Drill from 20070' MD to 20290' MD. Monitor well for losses. Change out saver sub to 5" DP. Drill from 20290' MD to 21090' MD. Gas: Max gas while drilling was 950 units. Fluids: 0 bbls FAZEPRO lost. Geology: 90% Sandstone: transparent, white-brown-dark grey-green-black, coarse-fine grain, sub rounded-rounded, poorly sorted, unconsolidated, trace mica, trace mica, abundant glauconite. 10% Siltstone 09/04/2015 Drill from 21090' MD to 22420' MD. Island wide fire drill. Gas: Max gas while drilling was 994 units. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone: transparent-white-brown-dark grey-green-black, course-fine grained, sub round-round, moderately sorted, unconsolidated, rare mica, abundant glauconite. 09/05/2015 Drill ahead from 22420' MD to 23370' MD. Gas: Max gas while drilling was 1075 units. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone: transparent-white-brown-dark gray-green-black, medium-very fine grain, sub round-round, moderately sorted, unconsolidated, trace pyrite, rare mica, abundant glauconite, trace siltstone. 09/06/2015 Drill ahead from 23370' MD to 24920’ MD. Gas: Max gas while drilling was 1704 units. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone: transparent-white-brown-dark gray-green-black, medium-very fine grain, sub round-round, moderately sorted, unconsolidated, trace pyrite, rare mica, abundant glauconite, trace shale, trace siltstone. 09/07/2015 Drill ahead from 24920' MD to 24986’ MD. Back reaming out of hole. Gas: Max gas while drilling was 747 units. Fluids: 56 bbls FAZEPRO lost. Geology: 90% Sandstone: transparent-white-brown-dark gray-green-black, medium-very fine grain, sub round-round, moderately sorted, unconsolidated, trace pyrite, rare mica, abundant glauconite, trace shale. 10% Siltstone. 09/08/2015 Continue to back ream out of hole and monitor well bore breathing through shale zone. Gas: Max gas while back reaming was 50 units. Fluids: 72 bbls FAZEPRO lost. 09/09/2015 Continue to back ream out of hole. Gas: Max gas while back reaming was 19 units. Fluids: 37 bbls FAZEPRO lost. 09/10/2015 Continue to back ream out of hole, pull out of hole and lay down BHA. Gas: Max gas while back reaming was 39 units. Fluids: 16 bbls FAZEPRO lost. 09/11/2015 Lay down BHA, rig up and test BOPs. Run in hole to 4053’ MD with 5.5” Liner. Gas: Max gas was 6 units. Fluids: 5 bbls FAZEPRO lost. 09/12/2015 Continue to run in hole with 5.5” Liner. Gas: Max gas was 8 units. Fluids: 0 bbls FAZEPRO lost. 09/13/2015 Finish run in hole was 5.5” Liner. Pump out of hole to 11792’ MD. Gas: Max gas was 66 units. Fluids: 0 bbls FAZEPRO lost. 09/14/2015 Pump out of hole with liner assembly, lay down running tool, make up clean out run BHA, run in hole to 4958’ MD with 4.5” drill pipe for clean out run. Gas: Max gas was 8 units. Fluids: 0 bbls FAZEPRO lost. 09/15/2015 Continue to run in hole and tag top of liner. Circulate bottoms up. Pull out of hole. Operations briefly shut down to clean spill from coolant line. Gas: Max gas was 6 units. Fluids: 0 bbls FAZEPRO lost. 09/16/2015 Lay down clean out BHA, Make up and run in hole with whip stock. Gas: Max gas was 6 units. Fluids: 0 bbls FAZEPRO lost. 09/17/2015 Mill window from 16318’ MD to 16334’ MD, pull out of hole, and lay down milling assembly. Gas: Max gas was 40 units. Fluids: 24 bbls FAZEPRO lost. 09/18/2015 Rig up and test BOPE, make up BHA # 8, run in hole, slip and cut drill line. Gas: Max gas was 21 units. Fluids: 0 bbls FAZEPRO lost. 09/19/2015 Slip and cut drill line, perform formation integrity test (FIT), drill ahead to 17736’ MD. Gas: Max gas while drilling was 781 units at 16920’ MD. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone. Geology based on gamma, no samples collected. 09/20/2015 Drill 8.75” hole from 17736’ MD to 19160’ MD Gas: Max gas while drilling was 1132 units at 17698’ MD. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone. Geology based on gamma, no samples collected. 09/21/2015 Drilled 8.75” hole from 19160’ MD to 20952’ MD. Back ream out of hole to change out Saver sub for 5” drill pipe. Gas: Max gas while drilling was 1365 units at 20353’ MD. Fluids: 0 bbls FAZEPRO lost. Geology: 100% Sandstone. Geology based on gamma, no samples collected. 09/22/2015 Drilled 8.75” hole from 20952’ MD to 22818’ MD Gas: Max gas while drilling was 1544 units at 21564’ MD. Fluids: 38 bbls FAZEPRO lost. Geology: 100% Sandstone. Geology based on gamma, no samples collected. 09/23/2015 Drill 8.75” hole from 22803' MD to 23200' MD. Circulate bottoms up and monitor losses. Back ream out of hole to 20300' MD. Gas: Max gas while drilling 980 units at 23043’ MD. Fluids: 28 bbls FAZEPRO lost. Geology: 100% Sandstone. Geology based on gamma, no samples collected. 09/24/2015 Change out Saver sub for 4.5” drill pipe. Back ream out of hole from 20370’ MD to 16334’ MD. Pull out of hole through window. Continue back reaming to 15850’ MD. Gas: Max gas while back reaming was 44 units. Fluids: 74 bbls FAZEPRO lost. 09/25/2015 Service top drive and change out IBOP seals. Back ream out of hole from 15850' MD to 8440' MD. Gas: Max gas while tripping was 13 units. Fluids: 29 bbls FAZEPRO lost. 09/26/2015 Back ream out of hole from 8440' MD to 1800' MD. Circulate bottoms up 5 times and monitor losses. Lay down BHA. Make up whip stock retrieval assembly. Pick up assembly and run in hole to 1520' MD. Gas: Max gas while tripping was 6 units. Fluids: 19 bbls FAZEPRO lost. 09/27/2015 Ran in hole from 1520' MD to 16318' MD. Fish for whip stock. Pull out of hole to 94' MD. No whip stock. Pick up BHA 10. Gas: Max gas while tripping was 13 units. Fluids: 44 bbls FAZEPRO lost. 09/28/2015 Lay down whip stock retrieval tool. Make up BHA 10. Cut and slip drill line. Run in hole from 94' MD to 16262' MD. Orient and work pipe. Hook whip stock. Observed swabbing on first stand. Pump out of hole to 14860' MD. Gas: Max gas while tripping was 7 units. Fluids: 0 bbls FAZEPRO lost. 09/29/2015 Pump out of hole from 14860' MD to 2314' MD. Monitor well, static. Pull of out hole from 2314'MD to 94' MD. Pull out whip stock retrieval tool. No whip stock. Make up clean out run BHA. Gas: Max gas was 5 units. Fluids: 35 bbls FAZEPRO lost. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000 24000 25000 26000 0 5 10 15 20 25 30 35 40 45 50 55 60 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: SP28-NW3 & SP28-NW3 L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-XX-0902655934 Days vs. Depth 08 August 2015 Sperry SDL Continue on Location LOCATION: Nikaitchuq AREA: North Slope Borough STATE: Alaska SPUD: 09-Aug-2015 TD: 23-Sep-2015 Commenced 16" Surface Hole Section On Bot: 10:00 09 Aug 2015 TD Surface Hole Section 2808' MD, 2464' TVD Off Bot: 00:30 11 Aug 2015 Commenced 12.25" Intermediate Hole Section On Bot: 12:30 15 Aug 2015 Landed 13.375" Casing 2788' MD, 2452' TVD 12 Aug 2015 TD Intermediate Hole Section 16562' MD, 3615' TVD Off Bot: 05:00 22 Aug 2015 Commenced 8.75" Production Hole Section On Bot: 08:00 01 Sep 2015 Landed 9.625" Casing 16552' MD, 3614' TVD 26 Aug 2015 TD Production Hole Section 24986' MD, 3552' TVD Off Bot: 01:00 07 Sep 2015 TD Production Hole Section 23200' MD, 3584' TVD Off Bot: 08:42 23 Sep 2015 Commenced 8.75" Lateral 1 Production Hole Section On Bot: 08:00 16 Sep 2015 Milled Window 16335' MD 3598' TVD 17 Sept 2015 WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Difficulties experienced: No difficulties were experienced. Recommendations: N/A Innovations and/or cost savings: N/A All equipment worked as planned and Insite work without any issues. We calibrated with 10%, 20% and 99% Cal gas. SP28-NW3 L1 Nikaitchuq ENI Petroleum North Slope AK-XX-0902750623 Alaska Doyon 15 Surface Alexander Kalenuik 5-Oct-2015 What went as, or better than, planned: Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Difficulties experienced: The only difficulty experienced was receiving data via WITS with MWD SLB. This occurred for very short periods of time. They were having computer problems throughout the section but the issues were fixed very quickly Recommendations: N/A Innovations and/or cost savings: N/A Doyon 15 Intermediate Kori Jo Plowman 26-Aug-2015 What went as, or better than, planned: All equipment ran and performed as planned. There were no issues with computers or gas equipment. SP28-NW3 Nikaitchuq ENI Petroleum North Slope AK-XX-0902655934 Alaska Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Difficulties experienced: Connection error caused by the comm port, which stopped functioning. No data was lost due to this error. Switched to different comm port on the computer and everything began working again. Recommendations: Change out the comm ports in the back of the IRIS when it is in the shop later this month. Innovations and/or cost savings: N/A The well went very well and as planned. I think that the multi-lateral calibration of the THA improved our ability to read gas values. SP28-NW3 L1 Nikaitchuq ENI Petroleum North Slope AK-XX-0902750623 Alaska Doyon 15 Production Lesley Hunter 5-Oct-2015 What went as, or better than, planned: Surface Data Logging After Action Review WELL NAME:LOCATION: OPERATOR:AREA: SPERRY JOB:STATE: RIG:HOLE SECTION: EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 All equipment ran and performed as planned. There were no issues with computers or gas equipment. Updated License for all computers. SP28-NW3 L1 Nikaitchuq ENI Petroleum North Slope AK-XX-0902750623 Alaska Doyon 15 Production Paul Kalenuik 23-Sep-2015 What went as, or better than, planned: Difficulties experienced: The Co-man and Geo computers did not work because of a lack of internet connection. CGI was notified but took no action. Recommendations: N/A Innovations and/or cost savings: N/A Surface Data Logging After Action Review WELL NAME:SP28-NW3 & SP28-NW3 L1 LOCATION:Nikaitchuq OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO:MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:9-Aug-2015 SPERRY JOB:AK-XX-0902655934 TD:23-Sep-2015 Marker MD INC AZ TVD TVDSS 16" Surface Borehole 20" Conductor Shoe 160.0 0.4 293.8 160.0 -106.5 SV-4 766.0 9.4 292.8 764.4 -710.9 SV-3 1,131.0 21.0 298.0 1,116.1 -1,062.5 SV-2 1,416.0 27.6 296.0 1,374.3 -1,320.6 Permafrost Base 1,860.0 30.7 296.2 1,928.6 -1,875.1 SV-1 2,056.0 34.4 294.6 1,928.6 -1,875.1 Ugnu Top (UG4)2,485.5 44.1 289.3 2,259.4 -2,205.9 13 3/8" Casing Shoe 2,788.0 54.7 291.7 2,452.1 -2,398.6 TD 16" Borehole 2,808.0 54.9 292.3 2,463.6 -2,410.1 12.25" Intermediate Borehole UG-2 Coal Bed Marker 3,547.0 80.3 288.0 2,742.0 -2,688.5 Lower Ugnu 13,005.7 79.2 279.1 3,129.4 -3,075.9 Schrader Bluff 14,238.0 79.1 280.3 3,362.0 -3,308.5 N Sequence Top 14,414.0 78.9 279.1 3,395.8 -3,342.3 N Sand Top 14,785.6 79.4 285.9 3,466.2 -3,412.7 N-2 Top 14,805.3 79.6 286.3 3,469.7 -3,416.2 N-3 Top 14,829.0 79.7 286.9 3,473.9 -3,420.4 N Sand Bottom 114,871.4 80.1 287.9 3,481.5 -3,428.0 N Sequence Base 15,407.0 84.7 302.9 3,542.7 -3,489.2 OA Sand Top 16.535.0 87.1 313.4 3,614.0 -3,560.5 9 5/8" Intermediate Casing 16,552.0 87.2 313.4 3,614.8 -3,561.4 TD 12 1/4" Borehole 16,562.0 87.2 313.4 3,615.3 -3,561.9 8.75" Lateral Borehole OA-2 16,705.0 87.1 313.7 3,622.2 -3,568.7 OA-3 16,822.8 87.5 311.8 3,627.9 -3,574.4 OA-3 17,763.7 91.7 300.2 3,650.2 -3,596.7 OA-2 17,884.3 91.7 299.1 3,646.3 -3,592.8 OA Sand Bottom 18,945.0 97.0 300.4 3,598.1 -3,544.5 OA-4 18,976.3 96.0 300.6 3,594.8 -3,541.3 OA-3 20,448.9 92.9 308.3 3,570.2 -3,516.7 OA-2 20,600.0 90.3 313.6 3,565.9 -3,512.4 OA Sand Top 20,875.0 89.8 315.2 3,569.6 -3,516.1 OA Sand Top 20,982.8 87.7 317.7 3,572.1 -3,518.8 OA-2 21,085.6 88.7 316.1 3,575.3 -3,521.8 OA-2 21,350.0 91.7 312.2 3,573.1 -3,517.1 OA-2 21,465.6 90.8 313.9 3,570.6 -3,517.1 OA-3 21,943.6 87.1 317.2 3,579.3 -3,525.8 OA-4 22,311.1 88.9 312.4 3,591.7 -3,538.2 OA-4 22,406.4 90.1 312.6 3,584.5 -3,531.0 OA-3 23,106.7 91.5 315.4 3,584.5 -3,531.0 OA-2 23,410.0 92.1 311.9 3,578.9 -3,525.4 Fault B 24,231.0 89.8 315.6 3,573.3 -3,519.8 Fault C 24,344.5 87.2 314.8 3,578.3 -3,522.8 OA-4 24,427.0 87.7 314.8 3,579.9 -3,526.4 OA Sand Bottom 24,493.4 90.4 314.4 3,580.5 -3,527.0 Fault D 24,604.7 92.5 313.8 3,577.7 -3,524.2 Fault E 24,834.5 92.4 313.0 3,569.1 -3,515.6 TD SP28-NW3 24,986.0 93.4 311.2 3,552.3 -3,498.9 Formation Tops SP28 NW3 Marker MD INC AZ TVD TVDSS 8.75" Lateral Borehole TOW 16,318.0 85.6 314.3 3,597.8 -3,544.3 BOW 16,335.0 87.4 313.2 3,598.8 -3,545.6 OA Sand Top 16,619.0 86.4 307.1 3,615.8 -3,562.4 OA-2 17,340.6 89.0 303.8 3,634.0 -3,582.2 OA-2 17,515.0 90.1 302.6 3,636.1 -3,582.6 OA-2 17,839.8 89.9 301.2 3,636.1 -3,582.7 OA-2 17,970.0 90.0 302.0 3,636.2 -3,582.7 Fault A1 18,090.0 90.8 299.7 3,635.7 -3,582.3 OA Sand bottom 18,301.3 97.7 298.6 3,620.7 -3,567.4 OA-4 18,370.0 97.0 298.6 3,611.1 -3,557.8 OA-3 18,624.6 93.2 300.2 3,592.8 -3,539.1 OA-2 18,663.4 93.0 301.4 3,590.7 -3,537.2 OA Sand Top 18,724.4 92.8 303.5 3,587.6 -3,533.9 Fault A2 18,765.0 92.9 305.5 3,585.6 -3,532.1 OA-3 19,202.6 92.3 307.7 3,566.8 -3,513.4 OA-2 19,260.0 91.1 304.9 3,565.1 -3,511.6 OA-2 20,450.0 87.9 309.4 3,567.4 -3,513.9 OA-3 20,510.0 87.5 309.2 3,569.8 -3,516.3 OA-3 21,777.1 90.4 314.4 3,569.6 -3,516.1 OA-2 21,870.0 90.2 315.5 3,569.0 -3,515.5 OA-2 22,515.4 89.3 314.3 3,571.2 -3,517.6 OA-2 22,604.7 90.4 313.5 3,571.3 -3,517.7 OA-2 22,824.5 87.5 312.8 3,574.5 -3,521.0 OA-3 22,944.4 86.9 311.8 3,580.4 -3,523.0 TD SP28-NW3 L1 23,200.0 89.8 312.6 3,584.3 -3,530.8 SP28 NW3 L1 Formation Tops SP28-NW3 & SP28-NW3 L1 ENI Petroleum MI Swaco Doyon 15 AK-XX-0902655934 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec cP lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 8-Aug 160 8.75 157 42 46 17/34/47 6.0 130/88/71/50/18/16 2/NA 3.00 0/97 0.00 0.25 9.7 23.0 .10/.30 500 60 Install Diverter 9-Aug 681 9.00 95 29 35 17/38/48 5.7 93/64/51/37/16/14 2/NA 3.50 0/96.5 0.15 0.30 9.8 25.0 .15/.40 2000 80 Drill ahead 10-Aug 2601 9.45 89 31 35 18/53/68 5.6 97/66/53/38/17/15 2/NA 4.25 0/95.75 0.15 0.25 9.5 23.0 .10/.40 1400 60 Drill ahead 11-Aug 2808 9.40 95 35 31 21/52/68 5.6 101/66/52/36/16/15 2/NA 4.50 -/96 0.15 0.20 9.5 24.0 .10/.40 1700 70 Run 13 3/8" Casing 12-Aug 2808 9.40 44 16 13 --45/29/23/16/6/5 ----------N/U BOPE 13-Aug 2808 9.40 44 16 14 --46/30/23/17/6/5 ----------P/U 5" DP 14-Aug 2808 9.40 43 14 14 --42/28/21/15/5/4 ----------Drill out Cement 15-Aug 3046 9.30 49 9 21 7/13/17 6.5 39/30/25/19/8/6 2/NA 4.50 4/92 0.10 0.60 9.6 -.50/2.20 17000 75 C/O Saver Sub 16-Aug 5059 9.40 53 15 30 13/19/21 6.0 60/45/39/32/15/12 2/NA 5.00 4/92 0.10 0.70 9.6 9.0 .40/2.30 17000 120 Drilling 12.25" Hole 17-Aug 7365 9.40 55 12 30 11/12/13 6.0 54/42/36/29/12/10 2/NA 6.00 3/91 0.10 0.60 9.5 14.0 .40/2.50 15000 100 Drilling 12.25" Hole 18-Aug 9686 9.30 53 13 26 10/11/12 5.4 52/39/33/26/11/9 2/NA 6.50 3/91 0.10 0.80 9.6 12.0 .70/2.80 16000 160 Drilling 12.25" Hole 19-Aug 12096 9.40 55 14 25 9/11/12 5.6 53/39/33/25/10/8 2/NA 6.00 3/91 0.10 0.90 9.5 10.0 .60/3.50 16000 140 Drilling 12.25" Hole 20-Aug 14061 9.40 53 12 31 11/12/13 5.6 55/43/37/29/12/10 2/NA 5.60 3/91 0.10 0.70 9.4 12.0 .50/3.10 15000 130 Drilling 12.25" Hole 21-Aug 16092 9.60 55 13 30 11/13/14 6.2 56/43/37/29/12/10 2/NA 7.00 3/90 0.15 0.80 9.6 13.0 .50/3.50 16000 120 Drilling 12.25" Hole 22-Aug 16562 9.60 53 12 33 12/14/16 6.5 57/45/39/31/13/11 2/NA 7.50 3/90 0.15 0.70 9.7 12.0 .40/2.50 15000 90 BROOH 23-Aug 16562 9.40 55 11 30 13/15/16 5.8 52/41/36/29/14/12 2/NA 7.00 3/91 0.15 0.50 9.4 12.0 .30/1.80 14000 80 BROOH 24-Aug 16562 9.30 51 10 22 10/12/13 5.8 42/32/28/22/11/9 2/NA 6.00 3/92 0.15 1.00 9.6 14.0 .90/3.60 14000 80 RU to RIH 9-5/8"CSG 25-Aug 16562 9.40 56 12 24 11/14/18 5.8 48/36/32/23/12/10 2/NA 6.00 2.5/91.5 0.15 0.80 9.5 13.0 .70/3.20 14000 80 Float 9-5/8" CSG 26-Aug 16562 9.55 79 12 24 12/15/18 5.8 48/36/33/25/12/11 2/NA 6.00 2.5/91.5 0.15 0.90 9.5 13.0 .70/32.0 14000 80 Float 9-5/8" CSG 27-Aug 16562 9.30 41 7 13 --27/20/17/13/6/5 ----------Cement CSG 28-Aug 16562 9.30 46 8 16 --32/24/20/17/6/5 ----------Test CSG 29-Aug 16562 9.30 44 8 16 --32/24/20/17/6/5 ----------M/U 4.5"DP 30-Aug 16562 9.30 45 8 16 --32/24/20/17/6/5 ----------RIH 8.75" Bit Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec cP lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 31-Aug 16562 9.4 43 11 13 5/6/6 4.9 35/24/19/15/6/5 NA/2 6.24 66/34 2.8 3.64 520 31.24 90000 0.75/60.36 2.8 Cut/Slip Drill Line 1-Sep 17823 9.4 46 13 12 5/6/6 5.4 38/25/20/15/6/5 NA/2 6.83 66/34 3.1 4.03 513 31.66 90000 0.71/61.65 2.6 Drill 8.75" 2-Sep 19851 9.4 46 14 15 5/6/6 4.6 43/29/23/17/6/5 NA/1 7.27 66/34 2.9 3.77 777 31.71 89000 6.88/61.84 2.7 Drill 8.75" 3-Sep 20934 9.4 47 14 17 7/7/8 4.6 45/31/25/18/7/6 NA/1 7.34 65/35 2.5 3.25 875 30.76 88000 10.47/60.28 2.8 Drill 8.75" 4-Sep 22211 9.4 49 15 17 7/7/8 4.6 47/32/25/18/7/6 NA/1 7.29 65/35 2.6 3.38 864 31 89000 10.22/59.99 2.8 Drill 8.75" 5-Sep 23240 9.4 49 15 17 7/7/8 4.6 47/32/25/17/7/6 NA/1 7.35 65/35 2.4 3.12 835 30.59 88000 9.93/60.67 2.7 Drill 8.75" 6-Sep 24771 9.4 50 16 17 7/7/8 4.6 49/33/27/19/7/6 NA/1 7.43 65/35 2.3 2.99 821 31.65 91000 9.5/61.74 2.7 Drill 8.75" 7-Sep 24986 9.4 51 15 18 7/7/8 N/A 48/33/27/19/7/6 NA/-7.19 65/35 2.4 3.12 821 31.48 91000 7.52/60.75 2.7 TD 8.75" 8-Sep 24986 9.4 52 16 18 7/7/8 N/A 50/34/27/19/7/6 NA/-7.19 65/35 2.4 3.12 809 31.48 91000 8.62/60.07 2.7 BROOH 9-Sep 24986 9.4 51 17 15 6/7/7 N/A 49/32/26/18/6/5 NA/-7.22 65/35 2.3 2.99 815 31.48 91000 8.62/60.07 2.7 BROOH 10-Sep 24986 9.4 50 16 15 6/7/7 N/A 47/31/23/16/6/5 NA/-7.24 65/35 2.3 2.99 801 31.24 90000 9.97/59.69 2.7 BROOH, POOH, L/D BHA 11-Sep 24986 9.4 57 17 17 7/8/8 N/A 51/34/27/19/7/6 NA/-7.29 65/35 2.2 2.86 808 31.24 90000 9.97/59.69 2.7 L/D BHA, Test BOPE, RIH W/ 5.5" Liner 12-Sep 24986 9.4 57 17 17 7/7/8 N/A 51/34/27/19/7/6 NA/-7.24 65/35 2.2 2.86 804 31.24 90000 9.97/59.69 2.7 RIH W/5.5" Liner 13-Sep 24986 9.4 66 16 16 6/7/7 N/A 48/32/26/18/6/5 NA/-7.84 65/35 2.3 2.99 798 31.24 90000 7.81/61.23 2.7 Finish RIH W/Liner, POOH 14-Sep 24986 9.4 57 16 16 6/7/7 N/A 48/32/26/18/6/5 NA/-7.19 65/35 2.3 2.99 795 31.48 91000 9.73/59.38 2.7 RIH for cleaning run 15-Sep 16362 9.45 63 17 17 7/7/8 N/A 51/34/27/19/7/6 NA/-7.46 64/36 2.3 2.99 720 30.80 91000 9/62.32 2.7 RIH for clean out, POOH 16-Sep 16362 9.45 59 17 14 6/6/7 N/A 48/31/25/17/6/5 NA/-7.50 65/35 2.3 2.99 708 31.07 90000 10.87/61.46 2.8 M/U whipstock, RIH, Drill window 17-Sep 16362 9.4 55 17 18 6/7/7 N/A 52/35/28/20/7/6 NA/-7.29 64/36 2.2 2.86 665 30.44 89500 9.05/60.7 2.7 Mill Window, POOH, L/D Milling BHA Remarks WELL NAME:LOCATION:Nikaitchuq OPERATOR:AREA:North Slope Borough MUD CO:STATE:Alaska RIG:SPUD:9-Aug-2015 SPERRY JOB:TD:23-Sep-2015 W a t e r a n d O i l B a s e d M u d R e c o r d Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec cP lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 18-Sep 16363 9.4 65 18 18 6/7/7 N/A 54/36/30/20/7/6 NA/-7.32 64/36 2.4 3.12 634 30.16 89000 9.74/60.54 2.7 Test BOPE, M/U BHA, RIH 19-Sep 17412 9.45 60 18 17 6/7/7 4.8 53/35/28/19/7/6 NA/2 7.54 64/36 2.3 2.99 633 30.44 89500 10.48/62.08 2.8 Drill Ahead 20-Sep 18935 9.45 56 18 18 6/7/7 4.7 56/36/29/20/7/6 NA/2 7.46 64/36 2.4 3.12 690 30.80 91000 10.1/61.64 2.7 Drill Ahead 21-Sep 20863 9.45 57 17 18 6/7/7 4.4 52/35/28/20/7/6 NA/2 6.26 64/36 2.3 2.99 775 30.56 90000 10.02/59.87 2.8 Drill Ahead 22-Sep 22596 9.45 54 18 16 6/7/7 4.5 52/34/27/19/7/6 NA/2 7.39 65/35 2.2 2.86 760 30.35 87000 10.19/60.96 2.8 Drill Ahead 23-Sep 23200 9.45 57 18 17 6/7/7 4.6 53/35/28/19/7/6 NA/2 7.49 65/35 2.4 3.12 785 29.86 85000 11.81/60.85 2.8 C/O Saver Sub 24-Sep 23200 9.7 55 19 15 6/7/7 4.6 53/34/27/18/7/6 NA/2 7.94 65/35 2.4 3.12 774 29.78 84000 13.7/63.74 2.8 C/O Upper IBOP 25-Sep 23200 9.7 54 17 16 6/7/7 N/A 50/33/25/18/7/6 NA/-8.14 65/35 2.4 3.12 715 29.28 82000 13.81/65.45 2.8 BROOH 26-Sep 23200 9.7 50 15 18 6/6/7 N/A 48/33/24/17/7/6 NA/-7.99 65/35 2.6 3.38 692 30.03 85000 13.01/64.61 2.8 RIH Retrieval Tool 27-Sep 23200 9.7 54 17 17 6/6/7 N/A 51/34/24/17/7/6 NA/-7.99 65/35 2.5 3.25 695 30.03 85000 13.01/64.61 2.8 POOH No Whipstock 28-Sep 23200 9.7 57 15 18 6/6/7 N/A 48/33/24/17/7/6 NA/-7.94 65/35 2.5 3.25 665 30.27 86000 12.75/64.32 2.8 PumpOOH 29-Sep 23200 9.7 57 15 17 6/6/7 N/A 47/32/23/17/7/6 NA/-7.94 65/35 2.5 3.25 614 30.27 86000 12.75/64.32 2.8 Mob Cleanout BHA 30-Sep 23200 9.7 56 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/36 2.5 3.25 620 30.27 86000 12.75/64.32 2.8 BROOH Cleanout BHA 1-Sep 23200 9.7 54 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.5 3.25 575 30.27 86000 12.75/64.32 2.8 BROOH Cleanout BHA 2-Sep 23200 9.7 54 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.5 3.25 565 30.27 86000 12.75/64.32 2.8 RIH Retrieval Tool 3-Sep 23200 9.7 55 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.5 3.25 530 30.27 86000 12.75/64.32 2.8 POOH Retrieval Tool 4-Sep 23200 9.7 57 15 18 6/6/7 N/A 48/33/24/17/7/6 NA/-7.94 65/35 2.5 3.25 527 30.27 86000 12.75/64.32 2.8 POOH Cleanout BHA 5-Sep 23200 9.7 54 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.5 3.25 525 30.27 86000 12.75/64.32 2.8 RIH Seal Bore Diverter 6-Sep 23200 9.7 51 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.6 3.38 552 30.27 86000 12.75/64.32 2.8 RIH 5.5" Liner 7-Sep 23200 9.7 51 16 16 6/6/7 N/A 48/32/24/17/7/6 NA/-7.94 65/35 2.6 3.38 550 30.27 86000 12.75/64.32 2.8 RIH 5.5" Liner 8-Sep 23200 9.7 51 17 15 6/6/7 N/A 49/32/24/17/7/6 NA/-7.94 65/35 2.6 3.38 545 30.27 86000 12.75/64.32 2.8 POOH Running Tool Casing Record 20" Conductor @ 160' MD, 160'TVD 13.375" Casing @ 2788' MD, 2452'TVD 9.625" Casing @ 16552' MD, 3614' TVD W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 100 1 Smith XR+ Milltooth 16.00 160 2808 2648 17.70 1.117 149.9 20 40 1750 740 1-1-WT-A-E-IN-NO-TD TD 16" Surface Hole Section 4 200 3 Hycalog SK716D-E11C PDC 12.25 2808 16562 13754 97.00 0.969 141.8 12 190 3400 900 5-3-BT-C-X-IN-CT-TD TD 12.25" Intermediate Section 5 300 4 Hycalog SK616M-K1D PDC 8.75 16562 24986 8424 81.10 0.902 103.8 10 120 3860 470 2-2-CT-A-X-IN-BT-TD TD 8.78" Production Section 8 500 5 Hycalog SK161M-K1D PDC 8.75 16335 23200 6865 52.90 0.902 129.8 12 120 3900 450 0-1-CT-T-X-IN-NO-TD TD 8.78" Production Section L1 WELL NAME:SP28-NW3 & SP28-NW3 L1 LOCATION:Nikaitchuq OPERATOR:ENI Petroleum AREA:North Slope Borough MUD CO: SPERRY JOB:AK-XX-0902655934 TD:23-Sep-2015 MI Swaco STATE:Alaska RIG:Doyon 15 SPUD:9-Aug-2015 B i t R e c o r d . . * 24 hr Recap:Countine finishing rig maintenace and rig up for new well. SDL on location and riged up. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 7-Aug-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: ConditionBit # 1 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB EVERMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i RIG UP PV Footage B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 0' 0' 0' Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth MBT 0' pH 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Rebecca Mulkey Maximum Report By:Logging Engineers:A. Paul Kalenuik / Rebecca Mulkey Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Rebecca Mulkey Maximum Report By:Logging Engineers:A. Paul Kalenuik / Rebecca Mulkey 0 0 13.38'' Units* Casing Summary Lithology (%) 0 MBT 160' pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 23157 C-5nC-2 in Minimum Depth Time: 0' 160' 160' Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 42 Footage Ss (ppb Eq) C-1 C-5i RIG UP PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.70 000 Spud mud 6.0160'46 Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) 160' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 0 160' ConditionBit # 1 3.0 16Smith XR Milltooth 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 8-Aug-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 500.00 Countine riging up inpreperation of spud. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Instal Diverte. Pick up BHA. Drill out conductor to 160. POOH pick up BHA#2 Drill to 889'MD. Max gas 4 units. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 2000.00 0 9-Aug-2015 12:00 AM Current Pump & Flow Data: 968 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 16.48 DOYON15 Report For: ConditionBit # 1 3.5 16Smith XR Milltooth 9.00 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) 160' WOB EVERMAR 7.928.90 Avg Min Comments RPM ECD (ppg) ml/30min 3Background (max)Trip Average Mud Type Lst Type Spud mud 5.4681'35 Depth in / out YP (lb/100ft2) 9.80 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i Drill ahead PV Footage B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 29 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 351.0 Flow In (gpm) Flow In (spm) 160' 889' 729' Max @ ft Current 743'68.0 Date: Time: 3 in 1 173'Minimum Depth C-5n 861' 150.0 C-2 4 SPP (psi) Gallons/stroke TFABit Type Depth 2595 MBT 889' pH 1.117 0 0 0 Siltst 13.38'' 607 144 Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Rebecca Mulkey Maximum Report By:Logging Engineers:A. Paul Kalenuik / Rebecca Mulkey Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 0 . . * 24 hr Recap:Drill from 889' MD to 2755' MD. Max gas 694u at 2432' MD. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1400.00 0 10-Aug-2015 12:00 AM Current Pump & Flow Data: 1600 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.15 DOYON15 Report For: ConditionBit # 1 4.3 16Smith XR Milltooth 9.45 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools SP Motor, Telescope 825, ARC 825 API FL Chromatograph (ppm) 160' WOB EVERMAR 9.8810.39 Avg Min Comments RPM ECD (ppg) ml/30min 111Background (max) Trip Average Mud Type Lst Type Spud mud 5.62601'35 Depth in / out YP (lb/100ft2) 9.50 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-902655934 - - Drill ahead PV Footage B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 31 Gas Summary 0 0 0 (current) Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 418.6 Flow In (gpm) Flow In (spm) 889' 2755' 1866' Max @ ft Current 1058'178.7 Date: Time: 135 in 5 2279'Minimum Depth C-5n 2432' 170.0 C-2 694 SPP (psi) Gallons/stroke TFABit Type Depth 2389 MBT Present pH 1.117 0 0 0 Siltst 13.38'' 712 168 Units* Casing Summary Lithology (%) 020382 28 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 103363 . . * 24 hr Recap: (max)(current) 0 0 Cly 18972 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner 12541 32 13.38'' Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2495 C-5n 2756' C-2 118 in 8 2760'Minimum Depth Time: reported. Max Gas observed while drilling was 118u at 2756’ MD. Max Gas observed while backreaming was 293u. 74 2755' 2808' 53' Max @ ft Current 2755'147.9 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 253.7 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 35 2648' Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-902655934 - - Run 13 3/8" casing PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 000 40 Spud mud 5.62808'31 Depth in / out Mud Type Lst Type Average Background (max) Trip 10.2010.26 Avg Min Comments RPM ECD (ppg) ml/30min Tools None API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 0 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 4.5 16Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.31 DOYON15 Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 11-Aug-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 1700.00 Drill from 2755’ MD to 2808’ MD. Circulate. BROOH to 349’. L/D BHA. RIH with 13 3/8” casing to 948’ MD. No losses Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Run in hole with casing to 2788' MD. Cement casing. N/D diverter system. Begin N/U BOP stack. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 12-Aug-2015 12:00 AM Current Pump & Flow Data: Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16Smith XR Milltooth 9.40 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools None API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type 40 Spud mud2808'13 Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-902655934 - - N/U BOPE PV 2648' Footage 58.00 B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 16 Gas Summary 0 0 0 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2808' 2808' 0' Max @ ft Current Date: Time: 3 in 2Minimum Depth C-5nC-2 4 SPP (psi) Gallons/stroke TFABit Type Depth 44 MBT Present pH 1.117 0 0 0 Siltst 13.38'' Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner 0 0 13.38'' Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 44 C-5nC-2 in Minimum Depth Time: Continue to rack back 5" DP. 2808' 2808' 0' Max @ ft Current Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 16 2648' Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - P/U 5" DP PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 40 Spud mud2808'14 Depth in / out Mud Type Lst Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools None API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 0 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 13-Aug-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l N/U BOP. Install blind rams. Service top drive. Set test plug. Pick up and rack back 5" drill pipe. Install new flowline. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:P/U 5" DP. Test BOPE. Test casing. Service top drive. M/U BHA. RIH t/2623' MD. Wash down t/2704 MD'. Drill out Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 0 14-Aug-2015 12:00 AM Current Pump & Flow Data: 600 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16Smith XR Milltooth 9.40 Size 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools None API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst Type 40 Spud mud2808'14 Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill out Cement PV 2648' Footage 58.00 B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 14 Gas Summary 0 0 0 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 2808' 2808' 0' Max @ ft Current Date: Time: shoe track t/2780' MD. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 43 MBT Present pH 1.117 0 0 0 Siltst 13.38'' 516 122 Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 0 0 Cly 10830 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 22 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner 20 4420 20 13.38'' Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 49 C-5n 2919' - C-2 65 in 3 2809'Minimum Depth Time: t/2808' MD. Drill 20' of new hole and displace to LSND. Slip & cut drilling line and CBU. Perform FIT. Drill ahead t/3150' MD. POOH 32 2808' 3150' 342' Max @ ft Current 2964'206.3 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 439.8 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 9 2648' Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - C/O Saver Sub PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 1200 40 LSND 6.53046'21 Depth in / out Mud Type Lst 80 Type Average 17Background (max) Trip 9.599.75 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 0 t/2775' to C/O saver sub. No losses reported. 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 4.5 16Smith XR Milltooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.93 DOYON15 Report For: Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 15-Aug-2015 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 17000.00 Drill out shoe track. POOH. L/D BHA. P/U & M/U BHA & RIH t/1560' MD. Perform shallow hole test. RIH/wash down Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:C/O saver sub. RIH f/2775’ t/3150’. Drill ahead t/5370’ MD. Daily losses: 28 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 17000.00 0 16-Aug-2015 12:00 AM Current Pump & Flow Data: 1900 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.36 DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 5.0 16Smith XR Milltooth 9.40 Size 2 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 9.7010.03 Avg Min Comments RPM ECD (ppg) ml/30min 4Background (max) Trip Average 105 Mud Type Lst 70 Type 40 Hycalog PDC LSND 6.0 2808' 5059'30 Depth in / out YP (lb/100ft2) 9.60 100 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 20 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 2648' 12.25 0.969 Footage 58.00 B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 15 Gas Summary 0 0 0 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 531.1 Flow In (gpm) Flow In (spm) 3150' 5370' 2220' Max @ ft Current 3339'227.3 Date: Time: 20 in 6 5244'Minimum Depth C-5n 3539' 75.0 C-2 129 SPP (psi) Gallons/stroke TFABit Type Depth 953 MBT Present pH 1.117 0 0 0 Siltst 13.38'' 901 213 Units* Casing Summary Lithology (%) 0 10 2854 12 907-685-0772Unit Phone: 21 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 20056 . . * 24 hr Recap: (max)(current) 0 0 Cly 6238 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 15 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner 1652 17 13.38'' 901 213 Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1455 C-5n 6619' 158.8 C-2 37 in 6 7528'Minimum Depth Time: 13 5370' 7725' 2355' Max @ ft Current 7451'213.0 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 409.5 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 12 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 000 40 Hycalog PDC LSND 6.0 2808' 7365'30 Depth in / out Mud Type Lst 100 Type Average 3Background (max) Trip 8.1610.47 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 5 2 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.0 16Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.69 DOYON15 Report For: Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 17-Aug-2015 12:00 AM Current Pump & Flow Data: 2000 Max 0 Chlorides mg/l 15000.00 Drill f/5370’ t/7725’. Daily losses: 51 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill 12.25” hole f/7725’ t/10010’ MD. Daily losses: 26 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 16000.00 0 18-Aug-2015 12:00 AM Current Pump & Flow Data: 2200 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.60 DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.5 16Smith XR Milltooth 9.30 Size 2 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 10.1810.44 Avg Min Comments RPM ECD (ppg) ml/30min 2Background (max) Trip Average Mud Type Lst 100 Type 40 Hycalog PDC LSND 5.4 2808' 9686'26 Depth in / out YP (lb/100ft2) 9.60 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 2648' 12.25 0.969 Footage 58.00 B. Simonson/R. Wimmer ShClyst TuffGvlCoal cP 13 Gas Summary 0 0 0 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 416.3 Flow In (gpm) Flow In (spm) 7725' 10010' 2285' Max @ ft Current 9238'228.5 Date: Time: 9 in 5 9686'Minimum Depth C-5n 8259' 128.0 C-2 16 SPP (psi) Gallons/stroke TFABit Type Depth 1253 MBT Present pH 1.117 0 0 0 Siltst 13.38'' 901 213 Units* Casing Summary Lithology (%) 0924 12 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:A. Paul Kalenuik / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 9 0 Cly 2272 . . * 24 hr Recap: (max)(current) 9 0 Cly 3718 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman / Gregory Dellner 30 1009 14 13.38'' 897 212 Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1055 C-5n 10107' 162.0 C-2 24 in 5 10975'Minimum Depth Time: 10 10010' 12305' 2295' Max @ ft Current 10999'211.2 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 424.2 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) O. Amend/R. Wimmer ShClyst TuffGvlCoal cP 14 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 000 40 Hycalog PDC LSND 5.6 2808' 12096'25 Depth in / out Mud Type Lst 70 Type Average 4Background (max) Trip 9.5810.47 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 4 2 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.0 16Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.71 DOYON15 Report For: Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 19-Aug-2015 12:00 AM Current Pump & Flow Data: 2700 Max 0 Chlorides mg/l 16000.00 Drill 12.25” hole f/10,010’ t/12,305’. Daily losses: 58 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill 12.25” hole f/12,305’ t/14,260’ MD. Daily losses: 160 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 15000.00 0 20-Aug-2015 12:00 AM Current Pump & Flow Data: 3000 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.98 DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.5 16Smith XR Milltooth 9.40 Size 2 160' 100% Gas In Air=10,000 UnitsConnection 0 Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 5.7810.78 Avg Min Comments RPM ECD (ppg) ml/30min 8Background (max) Trip Average Mud Type Lst 90 Type 40 Hycalog PDC LSND 5.6 2808' 14061'31 Depth in / out YP (lb/100ft2) 9.40 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 2648' 12.25 0.969 Footage 58.00 O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 12 Gas Summary 0 0 0 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 383.7 Flow In (gpm) Flow In (spm) 12305' 14260' 1955' Max @ ft Current 13520'176.1 Date: Time: 19 in 6 14172'Minimum Depth C-5n 13927' 154.0 C-2 99 SPP (psi) Gallons/stroke TFABit Type Depth 1253 MBT Present pH 1.117 0 0 0 Siltst 13.38'' 899 213 Units* Casing Summary Lithology (%) 0 10 2723 14 907-685-0772Unit Phone: 3 Gregory Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 0 0 Cly 15534 . . * 24 hr Recap: (max)(current) 742 0 Cly 48388 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 239 Gregory Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman / Gregory Dellner 30 10319 19 13.38'' 888 210 Units* Casing Summary Lithology (%) 73 MBT Present pH 1.117 0 415 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1355 C-5n 15226' 95.2 C-2 462 in 6 16188'Minimum Depth Time: 105 14260' 16313' 2053' Max @ ft Current 14729'156.3 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 461.5 Flow In (gpm) Flow In (spm) Gas Summary 0 454 455 (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 13 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Drill 12.25" Hole PV 24 hr Max Weight 125 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 498694 40 Hycalog PDC LSND 6.2 2808' 16092'30 Depth in / out Mud Type Lst 70 Type Average 38Background (max) Trip 5.2511.13 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 518 2 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 7.0 16Smith XR Milltooth 9.60 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.58 DOYON15 Report For: Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 21-Aug-2015 12:00 AM Current Pump & Flow Data: 3300 Max 89 Chlorides mg/l 16000.00 Drill 12.25” hole f/14,260’ t/16,313’. Daily losses: 174 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill 12.25” hole f/16,313’ t/16,562’ MD. Circulate B/U t/16,410’. BROOH t/11,649’ MD. Daily losses: 55 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 15000.00 174 22-Aug-2015 12:00 AM Current Pump & Flow Data: 3100 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.58 DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 7.5 16Smith XR Milltooth 9.60 Size 2 160' 100% Gas In Air=10,000 UnitsConnection 1566 Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 11.1711.41 Avg Min Comments RPM ECD (ppg) ml/30min Background (max) Trip Average Mud Type Lst 70 Type 40 Hycalog PDC LSND 6.5 2808' 16562'33 Depth in / out YP (lb/100ft2) 9.70 5313692 00 CementChtSilt C-4i C-4n 24 hr Max Weight 125 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - BROOH PV 2648' 12.25 0.969 Footage 58.00 O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 12 Gas Summary 0 1132 598 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 365.0 Flow In (gpm) Flow In (spm) 16313' 16562' 249' Max @ ft Current 16503'156.4 Date: Time: 104 in 6 16441'Minimum Depth C-5n 16523' - C-2 529 SPP (psi) Gallons/stroke TFABit Type Depth 1253 MBT Present pH 1.117 0 856 0 Siltst 13.38'' 897 212 Units* Casing Summary Lithology (%) 98 30 7460 17 907-685-0772Unit Phone: 323 Gregory Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman / Gregory Dellner Set AtSize 178.9 X-65 Grade 20.00'' 9.625" (max)(current) 1089 0 Cly 46153 . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Gregory Dellner Maximum Report By:Logging Engineers:Kori Jo Plowman / Gregory Dellner 30 0 0 13.38'' 899 213 Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1255 C-5nC-2 22 in 5Minimum Depth Time: 9 16562' 16562' 0' Max @ ft Current Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 11 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - BROOH PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.40 000 40 Hycalog PDC LSND 5.8 2808' 16562'30 Depth in / out Mud Type Lst 70 Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 UnitsConnection 0 2 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 7.0 16Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 23-Aug-2015 12:00 AM Current Pump & Flow Data: 1800 Max 0 Chlorides mg/l 14000.00 BROOH f/11,649’ t/4,740’ MD. Daily losses: 65 bbls. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: 0 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 0 0 13.38'' 0 0 Units* Casing Summary Lithology (%) 0 MBT Present pH 1.117 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1451 C-5n - - C-2 24 in 5 -Minimum Depth Time: Daily LSND Losses : 64bbls 8 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 10 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - RU to RIH w/ CSG PV 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.60 000 40 Hycalog PDC LSND 5.8 2808' 16562'22 Depth in / out Mud Type Lst 70 Type Average -2Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection 0 2 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.0 16Smith XR Milltooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: DOYON15 Report For: Morning Report Report # 18 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 24-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max 0 Chlorides mg/l 14000.00 BROOH F/4740' MD T/1658' MD. POOH T/444' MD and L/D BHA. Prepped to RIH with 9-5/8" CSG. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) - - Cly - Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 0 0 Units* Casing Summary Lithology (%) - MBT Present pH 1.117 - - - Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1356 C-5n - - C-2 49 in 3 -Minimum Depth Time: Daily LSND Losses : 0 bbls 7 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary - -- (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 12 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 RIH w/ CSG PV 24 hr Max 68.0 Weight - Hours C-3 -- Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 --- 40 Hycalog PDC LSND 5.8 2808' 16562'24 Depth in / out Mud Type Lst 70 Type Average 104Background (max)Trip -- Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 2 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.0 16 - Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 19 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 25-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max - Chlorides mg/l 14000.00 RIH w/ 9-5/8" CSG F/ Surface T/9800' MD. Running in hole at the time of report. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) - - Cly - Set AtSize 178.9 X-65 Grade 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 0 0 Units* Casing Summary Lithology (%) - MBT Present pH 1.117 - - - Siltst SPP (psi) Gallons/stroke TFABit Type Depth 1379 C-5n - - C-2 10 in 5 -Minimum Depth Time: Daily LSND Losses : 8 bbls 6 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary - -- (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 12 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - RIH w/ CSG PV 24 hr Max 68.0 Weight - Hours C-3 -- Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 9.50 --- 40 Hycalog PDC LSND 5.8 2808' 16562'24 Depth in / out Mud Type Lst 70 Type Average 103Background (max)Trip -- Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 2 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 6.0 16 - Smith XR Milltooth 9.55 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 20 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 26-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max - Chlorides mg/l 14000.00 RIH with 9-5/8" CSG F/ 9800' MD T/16552' MD. Prepping to circulate at time of report. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) - - Cly - Set AtSize 178.9 X-65 Grade 16562' 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 359 82 Units* Casing Summary Lithology (%) - MBT Present pH 1.117 - - - Siltst SPP (psi) Gallons/stroke TFABit Type Depth -41 C-5n - - C-2 61 in 3 -Minimum Depth Time: Daily LSND Losses : 0 bbls 12 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) 40.0 Gas Summary - -- (current) O. Amend/A. Lazzari ShClyst TuffGvlCoal cP 7 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 Cementing PV 24 hr Max 68.0 Weight - Hours C-3 -- Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) - --- 40 Hycalog PDC T-LSND - 2808' 16562'13 Depth in / out Mud Type Lst 70 Type Average -7Background (max)Trip -- Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 2 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 - 16 - Smith XR Milltooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 21 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 27-Aug-2015 11:59 PM Current Pump & Flow Data: 125 Max - Chlorides mg/l - Filled casing, circulated and conditioned mud. Cementing at time of report. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) - - Cly - Set AtSize 178.9 X-65 Grade 16562' 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 0 0 Units* Casing Summary Lithology (%) - MBT Present pH 1.117 - - - Siltst SPP (psi) Gallons/stroke TFABit Type Depth -46 C-5n - - C-2 10 in 1 -Minimum Depth Time: Hydrocarbon Analyzer and Gas Chromatograph. Pressure testing CSG to 3000psi at the time of report. 7 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) 40.0 Gas Summary - -- (current) O. Amend/J. Keener ShClyst TuffGvlCoal cP 8 2648' 12.25 0.969 Footage 58.00 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - Testing CSG PV 24 hr Max 68.0 Weight - Hours C-3 -- Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) - --- 40 Hycalog PDC T-LSND - 2808' 16562'16 Depth in / out Mud Type Lst 70 Type Average -0Background (max)Trip -- Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 2 Daily LSND Losses : 0 bbls 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 - 16 - Smith XR Milltooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 22 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 28-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max - Chlorides mg/l - Finished cementing. Nippled up. Tested BOPS. SDL crew performed multi-linear calibration on the Total Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Cut and Slip drill line. L/D 122 stands of 5" DP. P/U 4.5" DP. Picking up drill pipe at the time of report. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l - - 29-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 - 16 - Smith XR Milltooth 9.30 Size 2 2788' 160' 100% Gas In Air=10,000 Units-Connection - Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR -- Avg Min Comments Surface RPM ECD (ppg) ml/30min 0Background (max)Trip Average - Mud Type Lst 70 Type 40 Hycalog PDC T-LSND - 2808' 16562'16 Depth in / out YP (lb/100ft2) - --- -- Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight - Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - P/U 4.5" DP PV 2648' 12.25 0.969 Footage 58.00 O. Amend/J. Keener ShClyst TuffGvlCoal cP 8 40.0 Gas Summary - -- (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) 16562' 16562' 0' Max @ ft Current -- Date: Time: Daily Losses : 0 bbls 3 in 1 -Minimum Depth C-5n - - C-2 6 SPP (psi) Gallons/stroke TFABit Type Depth -44 MBT Present pH 1.117 - - - Siltst 13.38'' 0 0 Units* Casing Summary Lithology (%) - 30 - - 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter Set AtSize 178.9 X-65 Grade 16562' 20.00'' 9.625" (max)(current) - - Cly - . . * 24 hr Recap: 4 12 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 2 Hycalog PDC 12.25 0.969 16552' 0' 13744' 2808' 3 Hycalog PDC 12.25 0.969 97.00 2808' (max)(current) - - Cly - Set AtSize 178.9 X-65 Grade 16552' 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 0 0 Units* Casing Summary Lithology (%) - MBT Present pH 1.117 - - - Siltst SPP (psi) Gallons/stroke TFABit Type Depth -45 C-5n - - C-2 11 in 2 -Minimum Depth Time: Tripping in hole at the time of report. 4 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) 40.0 Gas Summary - -- (current) O. Amend/J. Keener ShClyst TuffGvlCoal cP 8 2648' 8.75 0.902 Footage 58.00 0.00 2808' Ss (ppb Eq) C-1 C-5i AK-AM-0902655934 - - TIH 4.5" DP PV 24 hr Max 68.0 Weight - Hours C-3 -- Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) - --- 40 Hycalog PDC T-LSND - 16552' 16562'16 Depth in / out Mud Type Lst 70 Type Average 111Background (max)Trip -- Avg Min Comments Surface RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 4 Daily Losses : 0 bbls 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 - 16 - Smith XR Milltooth 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 24 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 30-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max - Chlorides mg/l - P/U 170 stnds of 4.5" DP. P/U BHA. TIH F/ surface T/ 3200' MD. Rig crew conducted kick while tripping drill. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Lime Cor Solids (lb/bbl)% 3.64 6.24 4 12 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 2 Hycalog PDC 12.25 0.969 16552' 0' 13744' 2808' 3 Hycalog PDC (max)(current) - - Cly - Set At 12.25 0.969 97.00 2808' Size 178.9 X-65 Grade 16552' 20.00'' 9.625" 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 30 - - 13.38'' 0 0 Units* Casing Summary Lithology (%) - Present Alkal 1.117 - - - Siltst 40.0 SPP (psi) Gallons/stroke TFABit Type Depth 1 16/1743 C-5n - - C-2 6 in 2 -Minimum Depth Time: 4 16562' 16562' 0' Max @ ft Current -- Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: - Flow In (gpm) Flow In (spm) Gas Summary - -- (current) O. Amend/J. Keener ShClyst TuffGvlCoal cP 11 2648' 8.75 0.902 Footage 58.00 0.00 2808' - Ss Ratio C-1 C-5i AK-AM-0902655934 - - Slip and cut PV 24 hr Max 68.0 Weight - Hours C-3 Oil / Water - Intermediate CementChtSilt C-4i C-4n YP (lb/100ft2) 2.80 --- 40 Hycalog PDC FAZEPRO NA 16552' 16562'13 Depth in / out Mud Type Lst 70 Type Average 62Background (max)Trip -- Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection - 4 Daily Losses : 0 bbls 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 - Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: - DOYON15 Report For: Morning Report Report # 25 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE Conductor ROP ROP (ft/hr) 4.23 @ Mud Data Depth 31-Aug-2015 11:59 PM Current Pump & Flow Data: 0 Max - TIH F/ 3200' MD T/16400' MD. Displaced w/ OBM. Slip and cut drill line at the time of report. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Slip and cut drill line. Drill out shoe. Drill out rat hole. FIT to 13.00ppg EMW. Drilled ahead F/16582' MD T/18014' MD. Density (ppg) out (sec/qt) Viscosity 0 1-Sep-2015 11:59 PM Current Pump & Flow Data: 3626 Max @ Mud Data Depth Morning Report Report # 26 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE 96% Rig Activity: 11.43 DOYON15 Report For: ROP ROP (ft/hr) 4.23 - Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 Conductor rare mica, abundant glauconite. Geology: transparent, white-brown-dark grey-green-black, fine-very fine grain, sub rounded-rounded, well sorted, unconsolidated, 100% Gas In Air=10,000 Units-Connection 690 Tools Xceed 900, TeleScope 825, ARC 825 API FL Chromatograph (ppm) 20160' 2808' WOB EVERMAR 9.8311.10 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 15Background (max) Trip Average - Mud Type Lst 100 Type 40 Hycalog PDC FAZEPRO NA 16552' 17823'12 Depth in / out 4 (lb/100ft2) 3.10 000 184 Intermediate CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Oil / Water 43 Ss Ratio C-1 C-5i AK-AM-0902655934 - - Drilling Ahead PV 2648' 8.75 0.902 Footage 58.00 0.00 2808' M. Grub/J. Keener ShClyst TuffGvlCoal cP 13 Gas Summary 91 417 211 (current) Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 427.0 Flow In (gpm) Flow In (spm) 16562' 18014' 1452' Max @ ft Current 16877'240.0 Date: Time: Daily Losses : 0 bbls Drilling ahead at the time of report. 113 in 2 -Minimum Depth C-5n 17692' 0.0 C-2 783 SPP (psi) Gallons/stroke TFABit Type Depth 66/3446 YP 0 Present Alkal 1.117 310 389 172 Siltst 13.38'' 491 120 Units* Casing Summary Lithology (%) 40.0 0 35485 907-685-0772Unit Phone: 99 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 178.9 X-65 Grade 16552' 20.00'' 9.625" Set At 12.25 0.969 97.00 2808' Size (max)(current) 749 315 Cly 87270 2 Hycalog PDC 12.25 0.969 16552' 0' 13744' 2808' 3 Hycalog PDC 4 12 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD Lime Cor Solids (lb/bbl)% 4.03 6.83 . . * 24 hr Recap: Geology:Sandstone: trnsp-wh-brn-gry-grn-blk, f-vf gr, sb rnd-rnd, w srt, uncons, tr mic, abd glauc. 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD Lime Cor Solids (lb/bbl)% 3.77 7.27 0' 13744' 2808' 3 Hycalog PDC 4 12 2 Hycalog PDC 12.25 0.969 16552' 2808' Size (max)(current) 659 0 Cly 94148 178.9 X-65 Grade 16552' 20.00'' 9.625" Set At 907-685-0772Unit Phone: 98 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 27393 28 13.38'' 494 116 Units* Casing Summary Lithology (%) 40.0 145 Present Alkal 1.117 0 333 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 66/3446 YP C-5n 19966' 0.0 C-2 884 in 6 -Minimum Depth 12.25 Daily Losses : 0 bbls Drilling ahead at time of report. 310 18014' 20070' 2056' Max @ ft Current 19527'229.0 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 795.0 Flow In (gpm) Flow In (spm) Time: Gas Summary 0 352 226 (current) M. Grub/J. Keener ShClyst TuffGvlCoal cP 14 8.75 0.902 Footage 58.00 0.00 2808' 0.969 97.00 0 Ss Ratio C-1 C-5i AK-AM-0902655934 - - Drilling Ahead PV 24 hr Max 68.0 Weight 228 Hours C-3 Oil / Water 0 Intermediate CementChtSilt C-4i C-4n (lb/100ft2) 2.90 54167113 Hycalog PDC FAZEPRO NA 16552' 19851'15 Depth in / out 4 2648' Mud Type Lst 100 Type Average -32Background (max) Trip 11.56 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 40 Chromatograph (ppm) 20160' 2808' WOB EVERMAR 100% Gas In Air=10,000 Units-Connection 518 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 Conductor Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 API FL Rig Activity: 11.85 DOYON15 Report For: ROP ROP (ft/hr) 4.23 11.04 Morning Report Report # 27 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE @ Mud Data Depth 96% - 201 2-Sep-2015 11:59 PM Current Pump & Flow Data: 3866 Max Drilled F/18000' MD T/19056' MD at 500GPM. Drilled F/19056'MD T/20070' MD at 495GPM. Monitor well, static. Density (ppg) out (sec/qt) Viscosity . . * t 24 hr Recap:Drill F/20070' MD T/20290' MD. Monitor well. Change out saver sub to 5" DP. Drill F/20290' MD T/21090' MD. Density (ppg) out (sec/qt) Viscosity 141 3-Sep-2015 11:59 PM Current Pump & Flow Data: 3816 Max @ Mud Data Depth 96% - Morning Report Report # 28 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE 11.81 DOYON15 Report For: ROP ROP (ft/hr) 4.23 11.37 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 API FL Rig Activity: 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 Conductor Smith XR Milltooth 100% Gas In Air=10,000 Units-Connection 489 160' 2808' WOB EVERMAR 11.55 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 40 47Background (max) Trip Average - Mud Type Lst 90 Type Hycalog PDC FAZEPRO NA 16552' 20934'17 Depth in / out 4 2648' 2.50 4112490 Chromatograph (ppm) Intermediate CementChtSilt C-4i C-4n 189 Hours C-3 Oil / Water (lb/100ft2) 20 AK-AM-0902655934 - - Drilling Ahead PV 24 hr Max 0.969 97.00 0 Ss Ratio C-1 C-5i 68.0 Weight 0 cP 14 8.75 0.902 Footage 58.00 0.00 2808' M. Grub/J. Keener ShClyst TuffGvlCoal Flow In (spm) Time: Gas Summary 0 376 236 (current) Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 478.0 Flow In (gpm) 20070' 21090' 1020' Max @ ft Current 20919'209.0 12.25 10 Daily Losses : 0 bbls Drilling ahead at time of report. 340 10 -Minimum C-5n 20743' 0.0 C-2 950 Siltst SPP (psi) Gallons/stroke TFA Depth 65/3547 111 Present Alkal 1.117 0 350 0 481 104 Units* Casing Summary Lithology (%) 40.0 Bit Type YP in Depth 30073 22 907-685-0772Unit Phone: 105 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 178.9 X-65 Grade 16552' 20.00'' 9.625" Set At 13.38'' Size (max)(current) 721 0 Cly 107504 Hycalog PDC 4 12 2 Hycalog PDC 12.25 0.969 16552' 2808' Lime Cor Solids (lb/bbl)% 3.25 7.34 Geology:Sandstone - trnsp-wh-brn-gry-grn-blk, crs-f gr, sb rnd-rnd, po srt, uncons, tr pyr, tr mic, abd glauc. 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 0' 13744' 2808' 3 . . * 24 hr Recap: 2808' 3 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 0' 13744' Lime Cor Solids (lb/bbl)% 3.38 7.29 Hycalog PDC 4 12 2 Hycalog PDC 12.25 0.969 16552' 2808' (max)(current) 480 0 Cly 111242 Grade 16552' 20.00'' 9.625" Set At 13.38'' Size 907-685-0772Unit Phone: 62 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 25336 18 477 112 Units* Casing Summary Lithology (%) 40.0 Bit Type YP in Depth 55 Present Alkal 1.117 0 229 0 Siltst SPP (psi) Gallons/stroke TFA Depth 65/3549 C-5n 22103' 0.0 C-2 994 6 -Minimum 12.25 Daily Losses : 0 bbls 233 21090' 22420' 1330' Max @ ft Current 22167'200.0 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 822.0 Flow In (gpm) Flow In (spm) Time: Gas Summary 0 247 144 (current) M. Grub/J. Keener ShClyst TuffGvlCoal cP 15 8.75 0.902 Footage 58.00 0.00 2808' 24 hr Max 0.969 97.00 0 Ss Ratio C-1 C-5i 68.0 Weight Oil / Water (lb/100ft2) 20 AK-AM-0902655934 - - Drilling Ahead PV C-4i C-4n 112 C-3 0 Chromatograph (ppm) Intermediate CementChtSilt 125730 Hycalog PDC FAZEPRO NA 16552' 22211'17 Depth in / out 4 2648' Mud Type Lst 100 Type Average -42Background (max) . Trip Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 40 2.60 160' 2808' WOB EVERMAR Hours 178.9 X-65 100% Gas In Air=10,000 Units-Connection 316 Geology:trnsp-wh-brn-dk gry-grn-blk, crs-f gr, sb rnd-rnd, mo srt, uncons, r mic, abd glauc. 2788' 160' Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 Conductor Smith XR Milltooth 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 API FL Rig Activity: 12.06 DOYON15 Report For: ROP ROP (ft/hr) 4.23 11.5311.74 Morning Report Report # 29 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM SPY ISLAND NORTH SLOPE @ Mud Data Depth 96% - 76 4-Sep-2015 11:59 PM Current Pump & Flow Data: 3502 Max Drilled F/21090' MD T/22420' MD. Attended island wide fire drill. Drilling ahead at time of report. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap:Drilled ahead F/22420' MD T/23370' MD. Drilling ahead at time of report. Density (ppg) out (sec/qt) Viscosity 5-Sep-2015 11:59 PM Current Pump & Flow Data: 3860 Max 96% - 147 SPY ISLAND NORTH SLOPE @ Mud Data Depth 11.3311.82 Morning Report Report # 30 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM API FL Rig Activity: 17.16 DOYON15 Report For: ROP ROP (ft/hr) 4.23 Conductor Smith XR Milltooth 9.00 Size Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Condition 1-1-WT-A-E-IN-NO-TD Bit # 1 16 Geology: trnsp-wh-brn-dk gry-grn-blk, m-vf gr, sb rnd-rnd, mo srt, uncons, tr pyr, r mic, abd glauc, tr sltst. 100% Gas In Air=10,000 Units-Connection 346 160' 2808' WOB EVERMAR Hours 178.9 X-65 Avg Min Comments Surface Mud RPM ECD (ppg) ml/30min 40 2.40 17Background (max) . Trip Average - Mud Type Lst 100 Type Hycalog PDC FAZEPRO NA 16552' 23240'17 Depth in / out 4 2648' 4314497 Chromatograph (ppm) Intermediate CementChtSilt C-4i C-4n 199 C-3 0 Oil / Water (lb/100ft2) 20 AK-AM-0902655934 - - Drilling Ahead PV 24 hr Max 0.969 97.00 0 Ss Ratio C-1 C-5i 68.0 Weight cP 15 8.75 0.902 Footage 58.00 0.00 2808' M. Grub/J. Keener ShClyst TuffGvlCoal Flow In (spm) Time: Gas Summary 0 304 182 (current) Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 746.5 Flow In (gpm) 22420' 23370' 950' Max @ ft Current 23188'202.2 12.25 Daily Losses : 0 bbls 415 10 -Minimum C-5n 22103' 73.9 C-2 1075 Siltst SPP (psi) Gallons/stroke TFA Depth 65/3549 129 Present Alkal 1.117 0 279 0 465 110 Units* Casing Summary Lithology (%) 40.0 Bit Type YP in Depth 39030 22 907-685-0772Unit Phone: 77 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 20.00'' 9.625" Set At 13.38'' Size 2788' 160' (max)(current) 525 0 Cly 120596 16552' 12 2 Hycalog PDC 12.25 0.969 16552' 2808' Grade Lime Cor Solids (lb/bbl)% 3.12 7.35 2808' 3 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 0' 13744'Hycalog PDC 4 . . * 24 hr Recap: 190 60 0-0-No-A-E-In-No-TD 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Lime Cor Solids (lb/bbl)% 2.99 7.43 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Hycalog PDC 340 0 Cly 200626 16552' Set At 13.38'' Size 2788' 160' (max) 907-685-0772Unit Phone: 65 Lesley Hunter Maximum Report By:Logging Engineers:Kori Jo Plowman / Lesley Hunter 51149 35 Units* Casing Summary Lithology (%) 40.0 Bit Type YP in Depth 20.00'' 9.625" 91 Present Alkal 1.117 0 238 0 1704 Siltst SPP (psi) Gallons/stroke TFA Depth 65/35 C-5n 24191' 152.9 C-2 Daily Losses : 0 bbls 516 10 -Minimum 23370' 24920' 1550' Max @ ft Current 24165'207.3 12.25 Date: Avg to2808' Yesterday's Depth: Current Depth: 24 Hour Progress: 418.9 Flow In (gpm) 238 154 (current) M. Grub/J. Keener ShClyst TuffGvlCoal 8.75 0.902 Footage 58.00 0.00 2808' 0.969 97.00 0 Ss Ratio C-1 C-5i 68.0 Weight cP (lb/100ft2) 20 AK-AM-0902655934 - - Drilling Ahead PV 24 hr Max C-4i C-4n 113 C-3 0 Chromatograph (ppm) Intermediate CementChtSilt Gas Summary 3410779 0 Hycalog PDC FAZEPRO NA 16552' 24771'17 Depth in / out 4 2648' Mud Type Lst 100 Type Average - (max)Trip (current) Surface Mud RPM ECD (ppg) ml/30min 40 2.30 12 Grade Hours 178.9 X-65 Avg Min Comments Oil / Water 1650 227 160' 2808' EVERMAR trnsp-wh-lt brn-grn-blk, m-vf gr, sb rnd-rnd, mod srt, uncons, tr mic, tr pyr, abd glauc, r Sh, tr sltst. 100% Gas In Air=10,000 Units-Connection42Background 1 16 Geology: 9.40 Size Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Bit #WOB Report For: ROP ROP (ft/hr) 4.23 Flow In (spm) Time: 465 107 Morning Report Report # 31 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 Mud Data Depth 11.4912.05 API FL Conductor Smith XR Milltooth - 89 SPY ISLAND NORTH SLOPE @ 6-Sep-2015 11:59 PM Current Pump & Flow Data: 3901 Max 96% 12.20 Condition 1-1-WT-A-E-IN-NO-TD Drilled F/23370' MD T/24920' MD. Drilling ahead at time of report. Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 9.45 Depth Bit # Drilled F/24878' MD to TD at 24986' MD. Currently BROOH Condition 1-1-WT-A-E-IN-NO-TD SPY ISLAND NORTH SLOPE @ Mud Data 7-Sep-2015 11:59 PM API FL Conductor Smith XR Milltooth 9.40 Size Morning Report Report # 32 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 ROP (ft/hr) 4.23 Flow In (spm) Time: 457 110 Current Pump & Flow Data: 3622 96% Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: 24 Hour Progress: WOB 1 16 Geology:trnsp-wh-lt brn-grn-blk, m-vf gr, sb rnd-rnd, mod srt, uncons, tr mic, tr pyr, abd glauc, tr Sh, tr sltst, tr crs Calc. 100% Gas In Air=10,000 Units-Connection14Background 160' 2808' EVERMAR Surface Avg Min Comments Oil / Water 1551 Mud Max (current)(max) RPM ECD (ppg) ml/30min 40 2.40 12 Grade - (max) Trip Mud Type Lst Type Average FAZEPRO NA 16552' 24986'18 Depth in / out 4 2648' Hours 41 0 0 Hycalog PDC 178.9 X-65 Intermediate CementChtSilt Gas Summary Ss Tuff C-4n 17 C-3 0 2038 (lb/100ft2) 20 AK-AM-0902655934 BROOH PV ROP Ratio C-1 C-5i 68.0 Weight cP C-4i 58.00 0.00 2808' 0.969 97.00 M. Grub/J. Keener ShClyst GvlCoal Footage 76 (current) Date: Avg to2808' Flow In (gpm) 24920' 24986' 66' Max @ ft Current 24 hr Max Report For: Daily Losses : 56 bbls 57 8 -Minimum C-5n 24824' C-2 Siltst SPP (psi) Gallons/stroke TFA Depth 65/35 85 29 24986' Alkal 1.117 0 57 0 40.0 Bit Type YP in Depth 20.00'' 9.625" 8.75 0.902 12.25 5972 25 18 907-685-0772Unit Phone: 34 Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger Set At 13.38'' Size 2788' 160' 16552' 747 Units* Casing Summary Lithology (%) 118 0 Cly 87345 63 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Lime Cor Solids (lb/bbl)% 31.48 7.19 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 9.45 Depth Bit # BROOH and monitor well bore breathing through shale zone. Condition 1-1-WT-A-E-IN-NO-TD SPY ISLAND NORTH SLOPE @ Mud Data 8-Sep-2015 11:59 PM API FL Conductor Smith XR Milltooth 9.40 Size Morning Report Report # 33 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 ROP (ft/hr) 4.23 Flow In (spm) Time: 0 0 Current Pump & Flow Data: 0 96% Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: 24 Hour Progress: WOB 1 16 Geology:N/A 100% Gas In Air=10,000 Units-Connection7Background 160' 2808' EVERMAR Surface Avg Min Comments Oil / Water 1652 Mud Max (current)(max) RPM ECD (ppg) ml/30min 40 2.40 12 Grade - (max) Trip Mud Type Lst Type Average FAZEPRO NA 16552' 24986'18 Depth in / out 4 2648' Hours 9 0 0 Hycalog PDC 178.9 X-65 Intermediate CementChtSilt Gas Summary Ss Tuff C-4n 0 C-3 0 45 (lb/100ft2) 20 AK-AM-0902655934 BROOH PV ROP Ratio C-1 C-5i 68.0 Weight cP C-4i 58.00 0.00 2808' 0.969 97.00 M. Grub/J. Keener ShClyst GvlCoal Footage 9 (current) Date: Avg to2808' Flow In (gpm) 24986' 24986' 0' Max @ ft Current 24 hr Max Report For: Daily Losses : 72 bbls 15 3 -Minimum C-5n - C-2 Siltst SPP (psi) Gallons/stroke TFA Depth 65/35 12 0 24986' Alkal 1.117 0 14 0 40.0 Bit Type YP in Depth 20.00'' 9.625" 8.75 0.902 12.25 367 23 0 907-685-0772Unit Phone: 0 Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger Set At 13.38'' Size 2788' 160' 16552' 50 Units* Casing Summary Lithology (%) 26 0 Cly 5359 19 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Lime Cor Solids (lb/bbl)% 3.12 7.19 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD . . * 24 hr Recap: 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Lime Cor Solids (lb/bbl)% 2.99 7.22 8 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Units* Casing Summary Lithology (%) 10 0 Cly 1059 Set At 13.38'' Size 2788' 160' 16552' 19 907-685-0772Unit Phone: 0 Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger 38 32 0 Bit Type YP in Depth 20.00'' 9.625" 8.75 0.902 12.25 7 0 24986' Alkal 1.117 0 6 0 Siltst SPP (psi) Gallons/stroke TFA Depth 65/35 Minimum C-5n - C-2 Daily Losses : 37 bbls 10 6 - 24986' 24986' 0' Max @ ft Current 24 hr Max Report For: Date: Avg to2808' Flow In (gpm) 4 (current) M. Grub/J. Keener ShClyst GvlCoal Footage 40.0 Ratio C-1 C-5i 68.0 Weight cP C-4i 58.00 (lb/100ft2) 20 AK-AM-0902655934 BROOH PV ROP C-4n 0 C-3 0 00 Intermediate CementChtSilt Gas Summary Ss Tuff 0 0 0 Hycalog PDC 178.9 X-65 15 Depth in / out 4 2648' Hours 0.00 2808' 0.969 97.00 Mud Type Lst Type Average FAZEPRO (max) Trip (current)(max) RPM ECD (ppg) ml/30min 40 2.30 12 Grade Avg Min Comments Oil / Water 1751 Mud Max Background 160' 2808' EVERMAR Surface - Geology:N/A 100% Gas In Air= 24 Hour Progress: WOB 1 16 10,000 Units-Connection7 96% Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: DOYON15 ROP (ft/hr) 4.23 Flow In (spm) Time: 508 120 Current Pump & Flow Data: 2497 Morning Report Report # 34 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: API FL Conductor Smith XR Milltooth 9.40 Size NA 16552' 24986' SPY ISLAND NORTH SLOPE @ Mud Data 9-Sep-2015 11:59 PM Condition 1-1-WT-A-E-IN-NO-TD Continue to BROOH Density (ppg) out (sec/qt) Viscosity 9.45 Depth Bit # . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 9.45 Depth Bit # Continue to BROOH, POOH F/1,880' T/1,312'. SPY ISLAND NORTH SLOPE @ Mud Data 10-Sep-2015 11:59 PM API FL Conductor Smith XR Milltooth 9.40 Size NA 16552' 24986' Morning Report Report # 35 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 ROP (ft/hr) 4.23 Flow In (spm) Time: 0 0 Current Pump & Flow Data: 0 96% Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: Geology:N/A 100% Gas In Air= 24 Hour Progress: WOB 1 16 -10,000 Units-Connection5Background 160' 2808' EVERMAR Surface Comments Oil / Water 1650 Mud Condition 1-1-WT-A-E-IN-NO-TD (current)(max) RPM ECD (ppg) ml/30min 40 2.30 12 Grade (max)Trip Mud Type Lst Type Average FAZEPRO Depth in / out 4 2648' Hours 0.00 2808' 0.969 97.00 0 0 0 Hycalog PDC 178.9 X-65 0 Intermediate CementChtSilt Gas Summary Ss ROP C-4n 0 C-3 0 0 58.00 (lb/100ft2) 20 AK-AM-0902655934 POOH PV C-5i 68.0 Weight cP C-4i Tuff 15 B.Simonson/R.Wimmer ShClyst GvlCoal Footage 40.0 0 (current) Date: Avg to2808' Flow In (gpm) Avg Min Max 24986' 24986' 0' Max @ ft Current 24 hr Max Report For: Daily Losses : 16 bbls 8 5 -Minimum C-5n - C-2 Siltst SPP (psi) Gallons/stroke TFA Depth 65/35 0 0 24986' Alkal 1.117 0 0 0 Bit Type YP in Depth 20.00'' 9.625" 8.75 0.902 12.25 Ratio 32 26 0 907-685-0772Unit Phone: 0 Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger Set At 13.38'' Size 2788' 160' 16552' 39 C-1Units* Casing Summary Lithology (%) 0 0 Cly 43 0 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Lime Cor Solids (lb/bbl)% 2.99 7.24 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD . . * 24 hr Recap: 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD 81.10 Lime Cor Solids (lb/bbl)% 2.86 7.29 0 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 0 0 Cly 27 160' 16552' 6 C-1Units* Casing Summary Lithology (%) 907-685-0772Unit Phone: 0 Sonny Tiger Maximum Report By:Logging Engineers:Paul Kalenuik / Sonny Tiger 25 14 0 9.625" 8.75 0.902 12.25 Ratio Set At 13.38'' Size 2788' 0 24986' Alkal 1.117 0 0 0 Bit Type YP TFA Depth 65/35 0 in Depth 20.00'' C-5n - C-2 Daily Losses : 5 bbls 5 3 -Minimum 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Min Max 24986' 24986' 0' Max @ ft Date: Avg to2808' Flow In (gpm) Coal Footage 40.0 0 (current) Tuff 17 24986' B.Simonson/R.Wimmer ShClyst Gvl 68.0 Weight cP C-4i 8424' (lb/100ft2) 10 20 AK-AM-0902655934 RIH W/ 5.5" Liner PV Current C-4n 0 C-3 0 0 C-5i 0 Intermediate CementChtSilt Gas Summary Ss 0 0 0 Hycalog PDC 178.9 X-65 4 2648' Hours 0.00 2808' 0.969 97.00 58.00 Mud Type Lst Type Average FAZEPRO (max)Trip (current)(max) RPM ECD (ppg) ml/30min 40 2.20 12 Grade Comments Oil / Water 1757 Mud 2-2-CT-A-X-IN-BT-TD Condition 1-1-WT-A-E-IN-NO-TD Depth in / out Background 160' 2808' EVERMAR 120 Surface -10,000 Units-Connection- Geology:N/A 100% Gas In Air= 24 Hour Progress: WOB 1 16 Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg ROP (ft/hr) 4.23 Flow In (spm) Time: 0 0 Current Pump & Flow Data: 0 96% Morning Report Report # 36 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 API FL Conductor Smith XR Milltooth 9.40 Size NA 16552' 24986' SPY ISLAND NORTH SLOPE @ Mud Data 11-Sep-2015 11:59 PM POOH. L/D BHA. R/U and test BOPE. R/U and RIH with 5 1/2" liner T/4053' MD at time of report. Density (ppg) out (sec/qt) Viscosity 9.40 Depth Bit # . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity - Depth Bit # Continue to RIH W/ 5.5" Liner. SPY ISLAND NORTH SLOPE @ Mud Data 12-Sep-2015 11:59 PM API FL Conductor Smith XR Milltooth 9.40 Size NA 16552' 24986' Morning Report Report # 37 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 4.23 Flow In (spm) Time: 0 0 Current Pump & Flow Data: 0 96% Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg N/A 100% Gas In Air= 24 Hour Progress: WOB 1 16 ROP (ft/hr) 10,000 Units-Connection5 Geology: Background 160' 2808' EVERMAR Surface - Oil / Water 1757 Mud Condition 1-1-WT-A-E-IN-NO-TD Depth in / out RPM ECD (ppg) ml/30min 40 2.20 12 Grade Comments (max)Trip (current)(max) Average FAZEPRO Mud Type Lst Type Hours 0.00 2808' 0.969 97.00 58.00 Hycalog PDC 178.9 X-65 4 Ss - -- - C-5i - Intermediate Cement Gas Summary PV Current C-4n - C-3 - C-4i (lb/100ft2) 202648' Tuff 17 B.Simonson/R.Wimmer ShClyst GvlCoal Footage 40.0 - (current) Date: Avg to2808' Flow In (gpm) Min Max 24986' 24986' 0' Max @ ft AK-AM-0902655934 RIH W/ 5.5" Liner 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Daily Losses : 0 bbls 5 3 -Minimum C-5n - C-2 TFA Depth 65/35 - in Depth 20.00'' - 24986' Alkal 1.117 - - - Bit Type YP 8.75 0.902 12.25 Ratio Set At 2788'68.0 Weight cP - - - 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger 8 C-1Units* Casing Summary Lithology (%) 9.625" 13.38'' Size - Cly - 160' 16552' Cht Silt - 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 - Lime Cor Solids (lb/bbl)% 2.86 7.24 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 Chromatograph (ppm) Hycalog PDC 190 60 0-0-No-A-E-In-No-TD . . * 24 hr Recap: Intermediate9.625"16552'40.0 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD 81.10 Lime Cor Solids (lb/bbl)% 2.99 7.84 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 - Cly - 160' 24986' Cht Silt Chromatograph (ppm) 66 C-1Units* Casing Summary Lithology (%) 5.5" 13.38'' Size 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By:Logging Engineers:Kori Jo Plowman / Sonny Tiger - - - 0.902 12.25 Ratio Set At 2788'68.0 Weight cP - - 24986' Alkal 1.117 - - - Bit Type YP TFA Depth 65/35 - in Depth 20.00'' 8.75 C-5n - C-2 Daily Losses : 0 bbls 6 2 -Minimum 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke 24986' 24986' 0' Max @ ft AK-AM-0902655934 POOH Date: Avg to2808' Flow In (gpm) Min Max - (current) B.Simonson/R.Wimmer ShClyst GvlCoal Footage 15.5 (lb/100ft2) 10 202648' Tuff 16 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 PV Current C-4n - C-3 - - C-5i - Production Cement Gas Summary 4 Ss - -- 0.969 97.00 58.00 Hycalog PDC 178.9 C-4i 8424'24986' Mud Type Lst Type Hours 0.00 2808' Average FAZEPRO (max)Trip (current)(max) ECD (ppg) ml/30min 40 2.30 12 Grade Comments X-65 Oil / Water 1666 Mud 2-2-CT-A-X-IN-BT-TD Condition 1-1-WT-A-E-IN-NO-TD Depth in / out RPM Background 160' 2808' EVERMAR 120 Surface -10,000 Units-Connection3 Geology:N/A 100% Gas In Air= 24 Hour Progress: WOB 1 16 ROP (ft/hr) Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg 4.23 Flow In (spm) Time: 0 0 Current Pump & Flow Data: 0 96% Morning Report Report # 38 Customer: Well: Area: Location: Rig: SP28-NW3 ENI PETROLEUM Rig Activity: DOYON15 API FL Conductor Smith XR Milltooth 9.40 Size NA 16552' 24986' SPY ISLAND NORTH SLOPE @ Mud Data 13-Sep-2015 11:59 PM Finish RIH W/ 5.5" Liner, currently POOH T/11,792' at time of report. Density (ppg) out (sec/qt) Viscosity - Depth Bit # . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity - Depth Bit # @ Mud Data 14-Sep-2015 11:59 PM NA 16552' 24986' SPY ISLAND NORTH SLOPE ENI PETROLEUM Rig Activity: DOYON15 API FL Current Pump & Flow Data: 0 96% Morning Report Report # 39 Customer: Well: Area: Location: Rig: SP28-NW3 Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: WOB 1 16 ROP (ft/hr) 4.23 Flow In (spm) Time: 10,000 Units-Connection3 Geology:N/A 100% Gas In Air= Continue POOH. L/D running tool. M/U clean out run BHA. RIH with 4.5" DP T/4958 at time of report. 120 Surface - 2-2-CT-A-X-IN-BT-TD Condition 1-1-WT-A-E-IN-NO-TD Depth in / out RPM Background 160' 2808' EVERMAR X-65 Oil / Water 1657 Mud Conductor Smith XR Milltooth 9.40 Size (current)(max) ECD (ppg) ml/30min 40 2.30 12 Grade Comments (max)Trip Mud Type Lst Type Hours 0.00 2808' FAZEPRO 0.969 97.00 58.00 Hycalog PDC 178.9 C-4i 8424'24986' 4 Ss - -- - C-5i - Production Cement Gas Summary PV Current C-4n - C-3 - (lb/100ft2) 10 202648' Tuff 16 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 B.Simonson/R.Wimmer ShClyst GvlCoal Footage 15.5 - (current) to2808' Flow In (gpm) Min Max 0 0 24986' 24986' 0' Max @ ft AK-AM-0902655934 RIH Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Avg Daily Losses : 0 bbls 5 2 -Minimum C-5n - C-2 TFA Depth 65/35 - in Depth 20.00'' 8.75 - 24986' Alkal 1.117 - - - Bit Type YP 0.902 12.25 Ratio Set At 2788'68.0 Weight cP - - - - 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By:Logging Engineers:Alex Kalenuik / Sonny Tiger Units* Casing Summary Lithology (%) 5.5" 13.38'' Size Average - 160' 24986' Cht Silt Chromatograph (ppm) 8 C-1 7.19 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD 81.10 Lime Cor Solids (lb/bbl)% 2.99 Intermediate9.625"16552'40.0 - Cly . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity - Depth Bit # @ Mud Data 15-Sep-2015 11:59 PM NA 16552' 24986' SPY ISLAND NORTH SLOPE ENI PETROLEUM Rig Activity: DOYON15 API FL Current Pump & Flow Data: 0 96% Morning Report Report # 40 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: WOB 1 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Time: 10,000 Units-Connection2 Geology:N/A 100% Gas In Air= Continue RIH and tag top of liner. Circulate bottoms up. POOH . Operations briefly shut down to clean spill from 120 Surface - Condition 1-1-WT-A-E-IN-NO-TD Depth in / out RPM Background 160' 2808' EVERMAR Oil / Water 1763 Mud Conductor Smith XR Milltooth 9.40 Size 2-2-CT-A-X-IN-BT-TD (current)(max) ECD (ppg) ml/30min 40 2.30 12 Grade Comments (max)Trip Type Hours 0.00 2808' 0.969 97.00 Hycalog PDC 178.9 C-4i 8424'24986' 4 (current) Ss - -- - Lst - Production Cement Gas Summary - PV Current C-4n - C-3 - 10 202648' Tuff 17 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 X-65 B.Simonson/O.Amend ShClyst GvlCoal Footage 15.5 (lb/100ft2) C-5nC-5i to2808' Flow In (gpm) Min Max 0 0 24986' 24986' 0' Max @ ft AK-AM-0902655934 POOH Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Avg Daily Losses : 0 bbls coolant line. 3 1 -Minimum - C-2 TFA Depth 64/36 - in Depth 20.00'' 8.75 0.902 - 24986' Alkal 1.117 - - - Bit Type YP 12.25 Ratio Set At 2788'68.0 Weight cP - - - - - 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By:Logging Engineers:Alex Kalenuik / Sonny Tiger Units* Casing Summary Lithology (%) 5.5" 13.38'' Size Average 160' 24986' Cht Silt Chromatograph (ppm) 6 C-1 Intermediate 7.46 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD 81.10 Lime Cor Solids (lb/bbl)% 2.99 9.625"16552'40.0 - Cly . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 9.55 Depth Bit # @ Mud Data 16-Sep-2015 11:59 PM NA 16552' 24986' 2001 SPY ISLAND NORTH SLOPE ENI PETROLEUM Rig Activity: DOYON15 API FL Current Pump & Flow Data: 96% Morning Report Report # 41 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: Total Charges: MWD Summary Tools Xceed 900, TeleScope 825, ARC 825 Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time: WOB 1 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Connection2 Geology:N/A 100% Gas In Air= L/D clean out BHA, M/U and RIH W/ Whipstock . (current) Surface -10,000 Units- Depth in / out RPM Background 160' 2808' EVERMAR 120 Oil / Water 1759 Mud Conductor Smith XR Milltooth 9.45 Size ECD (ppg) ml/30min 40 2.30 12 Grade Comments 2-2-CT-A-X-IN-BT-TD Condition (max)Trip (max) Type Hours 0.00 2808' 0.969 97.00 Hycalog PDC TFA 178.9 C-4i 8424'24986' 4 (current) Ss - -- --- Production Cement Gas Summary - PV Current C-4n - C-3 - 2648' Tuff 14 5-3-BT-C-X-IN-CT-TD 0' 13744' 4 X-65 Lst 1-1-WT-A-E-IN-NO-TD B.Simonson/O.Amend ShClyst GvlCoal Footage 15.5 (lb/100ft2) C-5nC-5i to2808' Flow In (gpm) Min Max 351 83 16362' 16362' 0' Max @ ft AK-AM-0902750623 Prep to mill window Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Avg Daily Losses : 0 bbls 5 1 -Minimum - C-2 Depth 65/35 - in Depth 20.00'' 8.75 0.902 Ratio 24986' Alkal 1.117 - - - Bit Type YP 12.25 Set At 2788'68.0 Weight - - 160' 24986' Logging Engineers:Alex Kalenuik / Sonny Tiger - - Size Average 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By: Cht Silt Chromatograph (ppm) 6 C-1Units* Lithology (%) - 7.50 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' 81.10 Lime Cor Solids (lb/bbl)% 2.99 2808' cP 10 20 9.625"16552'40.0 - Cly . . * 24 hr Recap: 20 9.625"16552'40.0 - Lime Cor Solids (lb/bbl)% 2.86 2808' cP 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' - 7.29 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 40 C-1Units* Lithology (%)Cly Size Average 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By:Logging Engineers:Alex Kalenuik / Sonny Tiger - - Set At 2788'68.0 Weight - - 160' - Alkal 1.117 - - - Bit Type YP 12.25 Depth 64/36 - in Depth 20.00'' 8.75 0.902 Ratio - C-2 Daily Losses : 24 bbls 5 2 -Minimum 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Avg 16363' 16363' 0' Max @ ft AK-AM-0902750623 L/D Milling BHA Date: to16363' Flow In (gpm) Min Max 0 0 (lb/100ft2) C-5nC-5i 1-1-WT-A-E-IN-NO-TD B.Simonson/O.Amend ShClyst GvlCoal Footage - C-3 - 2648' 0' 13744' 4 X-65 PV Current C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD Lst Gas Summary - Cht Silt Chromatograph (ppm) (current) Ss - -- - Hycalog PDC TFA 178.9 C-4i 5 Type Hours 0.00 2808' 0.969 97.00 -- Production Cement (max)Trip (max) ECD (ppg) ml/30min 40 2.20 12 Grade Comments Condition Oil / Water 1755 Mud Conductor Smith XR Milltooth 9.40 Size Depth in / out RPM Background 160' 2808' EVERMAR Surface -10,000 Units-Connection3 Geology:N/A 100% Gas In Air= Mill Window, POOH, and L/D milling assembly at time of report. (current) WOB 1 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Total Charges: MWD Summary Tools Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time: 96% Morning Report Report # 42 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND NORTH SLOPE ENI PETROLEUM Rig Activity: DOYON15 API FL Current Pump & Flow Data: @ Mud Data 17-Sep-2015 11:59 PM NA 16363' 0 Density (ppg) out (sec/qt) Viscosity - Depth Bit # . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity - Depth Bit # 18-Sep-2015 11:59 PM NA 16363' 16363' 0 NORTH SLOPE ENI PETROLEUM Rig Activity: DOYON15 API FL Current Pump & Flow Data: @ Morning Report Report # 43 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND Total Charges: MWD Summary Tools Xceed 675, EcoScope 675, TeleScope 675 Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time: 1 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data 10,000 Units-Connection2 Geology:N/A 100% Gas In Air= R/U and Test BOPE, M/U BHA #8, RIH, Slip and Cut drill line at time of report. - (current) Depth in / out RPM Background 160' 2808' EVERMAR Oil / Water 1865 Mud Conductor Smith XR Milltooth 9.40 Size 2.40 12 Grade Comments Condition Surface WOB (max)Trip (max) 97.00 -- Production 178.9 C-4i 5 Type - -- - - Cht Silt Chromatograph (ppm) (current) Ss Cement PV Current C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD Lst - C-3 - 2648' 0' 13744' 4 X-65 B.Simonson/O.Amend ShClyst GvlCoal Footage C-5nC-5i Flow In (gpm) Min Max 0 0 ECD (ppg) 96% 16363' 16363' 0' Max @ ft AK-AM-0902750623 Slip and Cut Drill line Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Avg Daily Losses : 0 bbls 4 2 -Minimum - C-2 in Depth 20.00'' 8.75 0.902 to16363' Gas Summary Bit Type YP 12.25 Depth 64/36 - Ratio (lb/100ft2) Hycalog PDC TFA - Alkal 1.117 - - - Hours 0.00 2808' 0.969 Set At 2788'68.0 Weight - - 160' Logging Engineers:Alex Kalenuik / Sonny Tiger - - Size Average 907-685-0772Unit Phone: - Sonny Tiger Maximum Report By: 21 C-1Units* Lithology (%)Cly - 7.32 - 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' Lime Cor Solids (lb/bbl)% 3.12 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 40 20 9.625"16552'40.0 - . . * 24 hr Recap: 9.625"16552'40.0 564' Cor Solids (lb/bbl)% 2.99 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' 102 7.54 533 2 Hycalog PDC 12.25 0.969 16552' 2808' 781 C-1Units* Lithology (%)Cly Size Average 907-685-0772Unit Phone: 48 Sonny Tiger Maximum Report By:Logging Engineers:Alex Kalenuik / Sonny Tiger 12982 375 Set At 2788'68.0 Weight 0 91600 160' 17736' Alkal 1.117 0 233 0 Hours 0.00 2808' 0.969 Bit Type YP 12.25 Depth 64/36 238 Ratio (lb/100ft2) Hycalog PDC TFA in Depth 20.00'' 8.75 0.902 to16363' Gas Summary Minimum 16920' 116.0 C-2 17557' Avg Daily Losses : 0 bbls 94 6 16364' 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Lime 16363' 17736' 1373' Max @ ft AK-AM-0902750623 Drilling Ahead Date: Flow In (gpm) Min Max 11.76 474 51 ECD (ppg) 96% 115.0 C-5nC-5i GvlCoal Footage C-3 0 2648' 0' 13744' 4 X-65 Sh PV Current C-4n Tuff 17 5-3-BT-C-X-IN-CT-TD LstClyst 103 100% Cht Silt Chromatograph (ppm) (current) Ss Cement 18 0 0 4118 178.9 C-4i 5 Type 97.00 46 47 Production (max)Trip (max) 2.30 12 Grade Comments Condition Surface WOB Oil / Water 1860 Mud Conductor Smith XR Milltooth 9.45 Size Depth in / out RPM Background 160' 2808' EVERMAR 29 (current) 10,000 Units749Connection687 Geology:100% Sandstone 100% Gas In Air= Slip and cut drill line, perform FIT, Drill ahead. 1 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools Xceed 675, EcoScope 675, TeleScope 675 Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer 329.0 Morning Report Report # 44 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND ENI PETROLEUM Rig Activity: DOYON15 10.5710.83 API FL Current Pump & Flow Data: @ Total Charges: MWD Summary 19-Sep-2015 11:59 PM NA 16363' 17412' 3785 NORTH SLOPE Density (ppg) out (sec/qt) Viscosity 9.45 Depth Bit # . . * 24 hr Recap: out (sec/qt) Viscosity 9.50 Depth Bit # NORTH SLOPE Total Charges: MWD Summary 20-Sep-2015 11:59 PM NA 16363' 18935' 3777 DOYON15 10.9111.43 API FL Current Pump & Flow Data: @ Density (ppg) Morning Report Report # 45 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer 403.0 ENI PETROLEUM Rig Activity: 16 ROP (ft/hr) 4.23 Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools 10,000 Units186Connection241 Geology:100% Sandstone 100% Gas In Air= Drilled 8.75" hole F/17736' MD T/19160' MD. (current) Background 160' 2808' EVERMAR 1 Oil / Water 1856 Mud Conductor Smith XR Milltooth 9.45 Size 2.40 12 Grade Comments Condition Surface WOB RPM (max)Trip (max) 97.00 207 221 Production 178.9 C-4i 5 Type 116 0 0 53389 205 100% Cht Silt Chromatograph (ppm) (current) Ss Cement PV Current C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD LstClyst C-3 4 2648' 0' 13744' 4 X-65 Sh GvlCoal Footage Depth in / out C-5nC-5i Min Max 11.93 475 112 ECD (ppg) 96% 90.0 Xceed 675, EcoScope 675, TeleScope 675 17736' 19160' 1424' Max @ ft AK-AM-0902750623 Drilling Ahead Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Lime Avg Daily Losses : 0 bbls 361 6 18094' 17698' 131.0 C-2 18117' Flow In (gpm) in Depth 20.00'' 8.75 0.902 to16363' Gas Summary Bit Type YP 12.25 Depth 64/36 418 Ratio (lb/100ft2) Hycalog PDC TFA 19160' Alkal 1.117 0 404 0 Hours 0.00 2808' 0.969 Set At 2788'68.0 Weight 0 131844 160' Logging Engineers:Alex Kalenuik / Sonny Tiger 41429 108 Size Average 907-685-0772Unit Phone: 90 Sonny Tiger Maximum Report By: Units* Lithology (%)Cly Minimum 368 7.46 776 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' Cor Solids (lb/bbl)% 3.12 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625"16552'40.0 8621132 C-1 . . * 24 hr Recap: 9.625"16552'40.0 7181365 C-1 Cor Solids (lb/bbl)% 2.99 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' 164 6.26 189 2 Hycalog PDC 12.25 0.969 16552' 2808' Units* Lithology (%)Cly Minimum Size Average 907-685-0772Unit Phone: 93 Sonny Tiger Maximum Report By:Logging Engineers:Alex Kalenuik / Sonny Tiger 32928 66 Set At 2788'68.0 Weight 0 169198 160' Alkal 1.117 0 335 0 Hours 0.00 2808' 0.969 16363' Gas Summary Bit Type YP 12.25 64/36 Ratio (lb/100ft2) Hycalog PDC 20353' 173.0 C-2 19730' Flow In (gpm) Avg Daily Losses : 0 bbls 248 8 20557' 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Lime 19160' 20952' 1792' Max @ ft AK-AM-0902750623 Drilling Ahead Date: 457 109 ECD (ppg) 96% 252.0 Xceed 675, EcoScope 675, TeleScope 675to Depth 20952' Min Max 12.01 in 20.00'' 8.75 0.902 C-5nC-5iDepth 352 Depth in / outTFA C-3 4 2648' 0' 13744' 4 X-65 Sh Current C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD LstClyst GvlCoal 220 100% Cht Silt Chromatograph (ppm) (current) Ss Cement 116 0 0 50177 178.9 C-4i 5 Type 97.00 135 158 Production (max)Trip (max) 2.30 12 Grade Comments Condition Surface WOB RPM Oil / Water 1757 Mud Conductor Smith XR Milltooth 9.45 Size Background 160' 2808' EVERMAR 1 = Drilled 8.75" hole F/19160' MD T/20952' MD. BROOH to C/O saver sube to 5". Had high gas peaks of 1365 units at 20353' MD, 1064 units at 20796' MD, and 1061 units at 20845' MD (current) Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools PV Footage Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer 514.0 ENI PETROLEUM Rig Activity: Morning Report Report # 46 Customer: Well: Area: Location: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 11.0911.92 API FL Current Pump & Flow Data: @ Density (ppg) ROP (ft/hr) 4.23 Total Charges: MWD Summary 20-Sep-2015 11:59 PM NA 16363' 18935' 3792 NORTH SLOPE 10,000 Units431Connection 46 Geology:100% Sandstone. 100% Gas In Air out (sec/qt) Viscosity 9.50 Depth Bit # 16 . . * 24 hr Recap: 9.50 Depth Bit # 16 51 Geology:100% Sandstone. 100% Gas In Air10,000 Units431Connection NA 16363' 22596' 3865 out (sec/qt) Viscosity ROP (ft/hr) 4.23 Total Charges: MWD Summary 22-Sep-2015 11:59 PM NORTH SLOPE 11.6811.95 API FL Current Pump & Flow Data: @ Density (ppg) Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Morning Report Report # 47 Customer: Well: Area: Location: Yesterday's Depth: Current Depth: ROP Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer 411.0 ENI PETROLEUM (current) Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools PV Drilled 8.75" hole F/20952'' MD T/22818' MD. Had high gas peaks of 1230 units at 21124' MD, 1082 units at 21207' MD, 1357 units at 21494' MD, 1544 units at 21564' MD, 1268 Background 160' 2808' EVERMAR 1 Oil / Water 1854 Mud Conductor Smith XR Milltooth 9.45 Size Footage 2.20 12 Grade Comments Condition Surface WOB RPM (max)Trip (max) 102 121 Production = 178.9 C-4i 5 Type 104 4 0 50123 274 100% Cht Silt Chromatograph (ppm) (current) Ss Cement Current C-4n Tuff 16 5-3-BT-C-X-IN-CT-TD LstClyst GvlCoal C-3 5 2648' 0' 13744' 4 X-65 Sh Depth in / outTFA 97.00 C-5nC-5iDepth 438 Min Max 12.10 in 20.00'' 8.75 0.902 451 107 ECD (ppg) 96% 249.0 Xceed 675, EcoScope 675, TeleScope 675to Depth 22818' 20952' 22818' 1866' Max @ ft AK-AM-0902750623 Drilling Ahead Date: 24 hr Max Report For: Siltst SPP (psi) Gallons/stroke Lime Avg Daily Losses : 38 bbls 232 units at 22232' MD and 1146 units at 22427' MD. 6 20630' 21564' 106.0 C-2 22393' Flow In (gpm) 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Alkal 1.117 0 396 0 Hours 0.00 2808' 0.969 Set At 2788'68.0 Weight 0 18595 160' Logging Engineers:Alex Kalenuik / Sonny Tiger 28943 79 Size Average 907-685-0772Unit Phone: 118 Sonny Tiger Maximum Report By: Units* Lithology (%)Cly Minimum 106 7.39 542 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' Cor Solids (lb/bbl)% 2.86 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625"16552'40.0 7701544 C-1 . . * 24 hr Recap: 9.625"16552'40.0 415980 C-1 Cor Solids (lb/bbl)% 3.12 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' 132 7.49 273 2 Hycalog PDC 12.25 0.969 16552' 2808' Units* Lithology (%)Cly Minimum Size Average 907-685-0772Unit Phone: 77 Lesley Hunter Maximum Report By:Logging Engineers:Alex Kalenuik / Lesley Hunter 46601 58 Set At 2788'68.0 Weight 0 121034 160' 0 Hours 0.00 2808' 0.969 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC 23043' 0.0 C-2 23029' Flow In (gpm) Avg Daily Losses : 28bbls 97 5 Siltst SPP (psi) Gallons/stroke LimeAlkal 1.117 - BROOH Date: 24 hr Max Report For: Xceed 675, EcoScope 675, TeleScope 675to Depth 22818' 22818' 23200' 382' Max @ ft AK-AM-0902750623 Min Max 12.31 in 20.00'' 8.75 0.902 0 ECD (ppg) C-5nC-5iDepth 256226 Depth in / outTFA 97.00 0' 13744' 4 X-65 Sh C-4n Tuff 17 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 2648' 173 100% Cht Silt Chromatograph (ppm) (current) Ss Cement 0 52415 50 178.9 C-4i Type Clyst C-3 124 146 Production = 114 4 (max)Trip (max) Comments Condition Surface WOB RPM Oil / Water 18- Mud Conductor Smith XR Milltooth 9.45 Size Footage Background 160' 2808' EVERMAR 63 1 Drilled F/22803' MD T/23200' MD. CBU. BROOH T/20300' MD. BROOH at the time of report. (current) Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools PV Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer 422.0 ENI PETROLEUM Current 0 193.9 - Morning Report Report # 48 Customer: Well: Area: Location: Yesterday's Depth: Current Depth: ROP 96% SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Total Charges: MWD Summary 23-Sep-2015 11:59 PM NORTH SLOPE 11.9512.15 Current Pump & Flow Data: @ Rig: 10 out (sec/qt) Viscosity ROP (ft/hr) 4.23 API FLDensity (ppg) NA 16363' 23200'2.40 12 Grade 10,000 Units-Connection 4 Geology:100% Sandstone. 100% Gas In Air 9.50 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 4 100% Gas In Air10,000 Units-Connection NA 16363' 23200'2.40 12 Grade out (sec/qt) Viscosity ROP (ft/hr) 4.23 API FLDensity (ppg) -- Current Pump & Flow Data: @ Rig: 10 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Total Charges: NORTH SLOPE Morning Report Report # 49 Customer: Well: Area: Location: Yesterday's Depth: Current Depth: ROP 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - ENI PETROLEUM Current 0 - - Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data Tools PV MWD Summary 44 1 C/O Saver sub for 4.5"DP. BROOH F/20370'MD T/16334' MD. POOH through window. BROOH F/16318' MD T/ (current) 55 Mud Conductor Smith XR Milltooth 9.70 Size Footage 160' 2808' Condition Surface WOB RPM Oil / Water 19 EVERMAR (max) Comments Background = - - (max)Trip Type Clyst C-3 -- Production - -- -- Cht Silt Chromatograph (ppm) (current) Ss Cement 15 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 2648' 178.9 Sh C-4n Tuff C-4i 97.00 0' 13744' 4 X-65 C-5nC-5iDepth --- Min Max - in 20.00'' 8.75 0.902 0 ECD (ppg)Xceed 675, EcoScope 675, TeleScope 675to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 - BROOH Date: 24 hr Max Report For: 24-Sep-2015 11:59 PM Siltst SPP (psi) Gallons/stroke LimeAlkal 1.117 Avg Daily Losses : 74 bbls 15850' MD. BROOH at the time of report. 15 5 - - 0.0 C-2 - Flow In (gpm) 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - Hours 0.00 2808' 0.969 Depth in / outTFA Set At 2788'68.0 Weight - - 160' Logging Engineers:Alex Kalenuik / Lesley Hunter - - Size Average 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By: Units* Lithology (%)Cly Minimum - 7.94. - 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 190 60 0-0-No-A-E-In-No-TD Intermediate Casing Summary 5.5" 13.38'' Cor Solids (lb/bbl)% 3.12 2808' cP 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625"16552'40.0 -44 C-1 . . * 24 hr Recap: 9.65 Depth Bit # 16 5 5 100% Gas In Air10,000 Units-Connection - Service top drive and C/O IBOP seals. BROOH F/15850' MD T/8440' MD. 23200'2.40 L-80 12 Grade Surface RPM EVERMAR - Weld Viscosity ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Rig: 2711 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Total Charges: NORTH SLOPE Morning Report Report # 50 Customer: Well: Area: Location: ENI PETROLEUM - BROOH Yesterday's Depth: Current Depth: ROP 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - Current 129 - - Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 13 1 54 WOB Oil / Water 17 out (sec/qt) (current)(max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 2808' Condition NA 16363' (max) Comments Background = - - Trip Type Clyst C-3 -- Production - -- -- Cht Silt Chromatograph (ppm) (current) Ss CementSh C-4n Tuff 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 97.00 Intermediate 178.9 6837'23200' 13744' 4 X-65 190 60 0-0-No-A-E-In-No-TD C-5nC-5iDepth ---- C-4i Max - in 20.00'' 8.75 0.902 546 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 25-Sep-2015 11:59 PM Current Pump & Flow Data: SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Avg Daily Losses : 29 bbls 8 3 - - C-2 - Flow In (gpm) Siltst 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 Depth in / outTFA 16363' Gas Summary Bit Type YP Set At 2788'68.0 Weight - - 160' - Alex Kalenuik / Lesley Hunter - - Average 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers: Units* Lithology (%)Cly Minimum 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 0.00 2808' Cor Solids (lb/bbl)% 3.12 2808' cP 8.14 2648' Mud 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38'' -13 C-1 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625" Size Hours 0.969 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 3 100% Gas In Air10,000 Units-Connection - BROOH F/8440' MD T/1800' MD. CBU 5x and monitor losses. L/D BHA. M/U whipstock retrieval assembly. P/U (current) 23200'2.60 L-80 12 Grade Surface RPM EVERMAR - Weld 1 50 ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Rig: 10 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Total Charges: NORTH SLOPE Morning Report Report # 51 Customer: Well: Area: Location: ENI PETROLEUM - TIH for Whipstock Yesterday's Depth: Current Depth: ROP 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - Current 0 - - Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 6 Oil / Water 15 out (sec/qt) Viscosity (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 2808' NA 16363' - - Production WOB (max) Comments Background =Trip Type Clyst C-3 -- - -- -- Cht Silt Chromatograph (ppm) (current) Ss CementSh C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 97.00 Intermediate 178.9 6837'23200' 13744' 4 X-65 190 60 0-0-No-A-E-In-No-TD C-5nC-5iDepth ---- C-4i Max - in 20.00'' 8.75 0.902 0 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 26-Sep-2015 11:59 PM Current Pump & Flow Data: SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Avg Daily Losses : 19 bbls assembly and RIH T/1520' MD. 5 3 - - C-2 - Flow In (gpm) Siltst 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 Depth in / outTFA 16363' Gas Summary Bit Type YP Set At 2788'68.0 Weight - - 160' - Alex Kalenuik / Lesley Hunter - - Average 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers: Units* Lithology (%)Cly Minimum 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 0.00 2808' Cor Solids (lb/bbl)% 3.38 2808' cP 7.99 2648' Mud Condition 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38'' -6 C-1 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625" Size Hours 0.969 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air10,000 Units-Connection - RIH F/1520' MD T/16318' MD. Fish for whip stock. POOH T/94' MD. No whipstock. P/U BHA 10. (current) 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 54 ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Oil / Water Current Depth: Rig: 10 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Total Charges: - Morning Report Report # 52 Customer: Well: Area: Location: ENI PETROLEUM P/U Whipstock BHA Yesterday's Depth: 13 ROP 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - Current 0 NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 160' 17 out (sec/qt) 2808' - Viscosity (max) Conductor Smith XR Milltooth 9.70 Size Footage 16363' 113 - - Production = - WOB (max) Comments Background Trip Type Clyst C-3 --- -- Cht Silt Chromatograph (ppm) (current) Ss CementSh 23200' C-4n Tuff 17 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 0-1-CT-T-X-IN-NO-TD 97.00 54.40 Intermediate 43 178.9 6837' 4 X-65 190 60 0-0-No-A-E-In-No-TD C-5nC-5iDepth ---- C-4i Max - in 20.00'' 8.75 0.902 0 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 27-Sep-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Avg Daily Losses : 44 bbls 3 1 - - C-2 - Flow In (gpm) Siltst 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' Depth in / outTFA 16363' Gas Summary Bit Type YP 12.25 Set At 2788'68.0 Weight - - 160' - Alex Kalenuik / Lesley Hunter - - Average 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers: Units* Lithology (%)Cly Minimum 2 Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 0.00 2808' Cor Solids (lb/bbl)% 3.25 2808' cP 7.99 2648' Mud Condition 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38'' -13 C-1 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625" Size Hours 0.969 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air10,000 Units-Connection - L/D whip stock retrieval tool. M/U BHA 10. Cut and slip drill line. RIH F/94' MD T/16262' MD. Orient and work pipe. (current) 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 57 ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Oil / Water Yesterday's Depth: Current Depth: Rig: 301 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: Current 97 - Morning Report Report # 53 Customer: Well: Area: Location: ENI PETROLEUM 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - Pump OOH w/ whip stock Total Charges: Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 7 15 out (sec/qt) 2808' NA Viscosity (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 16363' 113 - - Production = - WOB (max) Comments Background Trip Type Clyst C-3 --- --- Cht Silt Chromatograph (ppm) (current) Ss CementSh 23200' C-4n Tuff 18 5-3-BT-C-X-IN-CT-TD Lst GvlCoal 0-1-CT-T-X-IN-NO-TD 97.00 54.40 Intermediate 43 178.9 6837' 4 X-65 190 60 0-0-No-A-E-In-No-TD C-5nC-5iDepth ---- C-4i Max - in 20.00'' 8.75 0.902 410 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 28-Sep-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Daily Losses : 0 bbls Hook whip stock. Observed swabbing on first stand. Pump OOH T/14860' MD. 3 1 - - C-2 - Flow In (gpm) Siltst 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' Depth in / outTFA 16363' Gas Summary Bit Type YP 12.25 Set At 2788'68.0 Weight - - 160' - Alex Kalenuik / Lesley Hunter - - Average 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers: Units* Lithology (%)Cly Minimum Hycalog PDC 12.25 0.969 16552' 2808' 3 Hycalog PDC 0.00 2808' Cor Solids (lb/bbl)% 3.25 2808' cP 7.94 2648' Mud Condition Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38'' 2 0.969 -7 C-1 1-1-WT-A-E-IN-NO-TD ml/30min 4020 9.625" Size . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 2 Cor Solids (lb/bbl)% 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 907-685-0772Unit Phone: - Lesley Hunter Maximum Report By:Logging Engineers:Alex Kalenuik / Lesley Hunter - -- - 160' - Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst Daily Losses : 35 bbls No whip stock. M/U clean out run BHA at the time of report. 3 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 29-Sep-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 0 ECD (ppg) 0' to C-5iDepth ---- C-4i - C-1 190 60 0-0-No-A-E-In-No-TD 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) 17 5-3-BT-C-X-IN-CT-TD Lst GvlCoalChtSiltSs Cement -- -- Trip Type Clyst C-3 Sh WOB (max) 16363' - - 178.9 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 15 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 3 96% Avg 24 Hour Progress: Time:B.Simonson/R.Wimmer - P/U Clean out run BHA Total Charges: Max 0 - Morning Report Report # 54 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: 10 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 57 Pump OOH F/14860' MD T/2314' MD. Monitor well, static. POH F/2314'MD T/94' MD. POH whip stock retrieval tool. (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air RIH with cleanout BHA to 16,320' MD. Mill to 16,357' MD. BROOH (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: 3460 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)656 - Morning Report Report # 55 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - BROOH Cleanout BHA Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 3 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 - Trip Type Clyst C-3 -- - 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4nDepth ---- C-4i - C-1 - in 20.00'' 8.75 0.902 155 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 30-Sep-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Daily Losses : 30 bbls 3 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - Depth in / outTFA 97.00 54.40 C-5i 190 - -- - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Cly Minimum Average 7 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 7 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst Daily Losses : 37 bbls 3 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 1-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 155 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 3 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - BROOH Cleanout BHA Total Charges: Max 656 - Morning Report Report # 56 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: 3460 SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 Continue to BROOH cleanout BHA (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air Lay down cleanout BHA, test BOP, make up bent hook retrieval tool, RIH w/retrieval tool (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)- Morning Report Report # 57 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - RIH Retrieval Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 Depth C-1 - Trip Type Clyst C-3 -- -- 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n ---- C-4i - C-5i - in 20.00'' 8.75 0.902 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 2-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 2 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Depth in / outTFA 97.00 54.40 190 - -- 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : Cly Minimum Average 5 - 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl)% 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 24 bbls 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst 2 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 3-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalChtSiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA $2,010.00 Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - POOH Retrieval Tool Total Charges: Max - Morning Report Report # 58 Customer: Well: Area: Location: ENI PETROLEUM $48,430.00 Yesterday's Depth: Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) -- @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 RIH w/retrieval tool, orient hook. POOH to 100' MD (current) 10,000 Units -100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air RIH w/retrieval tool, orient hook. POOH to 100' MD (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)- Morning Report Report # 59 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - POOH Cleanout BHA Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 Depth C-1 - Trip Type Clyst C-3 -- -- 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n ---- C-4i - C-5i - in 20.00'' 8.75 0.902 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 4-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 2 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Depth in / outTFA 97.00 54.40 190 - -- 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 40 bbls Cly Minimum Average 5 - 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 40 bbls 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst 2 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 5-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - RIH Diverter Total Charges: Max - Morning Report Report # 60 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 POOH, L/D cleanout BHA. Clean rig floor. M/U Seal Bore diverter and BHA. RIH (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air RIH Seal Bore Diverter and latch in. POOH and lay down tool. Rig up liner equipment and RIH 5.5" liner (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)- Morning Report Report # 61 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - RIH 5.5" Liner Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 Depth C-1 - Trip Type Clyst C-3 -- -- 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n ---- C-4i - C-5i - in 20.00'' 8.75 0.902 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 6-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 2 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Depth in / outTFA 97.00 54.40 190 - -- 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 14 bbls Cly Minimum Average 5 - 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst 2 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 7-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - RIH 5.5" Liner Total Charges: Max - Morning Report Report # 62 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 RIH 5.5" liner (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air Install RAM liner hanger. Begin to POOH. Top-drive struck tool joint in rotary table. Made repairs and recertified. (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)- Morning Report Report # 63 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - POOH Running Tool Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 Depth C-1 - Trip Type Clyst C-3 -- -- 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n ---- C-4i - C-5i - in 20.00'' 8.75 0.902 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 8-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV POOH with running tool. 2 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Depth in / outTFA 97.00 54.40 190 - -- 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : Cly Minimum Average 5 - 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst 2 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 9-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - RIH LEM Tool Total Charges: Max - Morning Report Report # 64 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 POOH liner running tool and laid down. Made up LEM BHA and RIH (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 . . * 24 hr Recap: 9.70 Depth Bit # 16 5 -100% Gas In Air Set LEM tool and install packer. Displace to 9.2 ppg brine. L/D DP from 16188' to 15751'. Well observed flowing. (current) 10,000 Units 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr)- Morning Report Report # 65 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - Circulate Total Charges: Max Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 16 out (sec/qt) 2808' NA (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 - - Production = -- Comments Background -Connection (max) 16363' - - 178.9 Depth C-1 - Trip Type Clyst C-3 -- -- 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs CementTuff Chromatograph (ppm) (current) Sh 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n ---- C-4i - C-5i - in 20.00'' 8.75 0.902 ECD (ppg) 0' to Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: 24 hr Max Report For: 10-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV Increase brine weight to 9.35, then 9.4, then 9.5 ppg 2 1 - - C-2 - Flow In (gpm) Siltst - 1.117 13744' 4 X-65 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC Depth in / outTFA 97.00 54.40 190 - -- 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : Cly Minimum Average 5 - 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Casing Summary BTC 5.5" 13.38''68.0 Weight 160' ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 . . * 24 hr Recap: ml/30min 4020 9.625" Size Hours 16552'Hydril S63 40.0 L-80 Casing Summary BTC 5.5" 13.38''68.0 Weight 160' 2 Cor Solids (lb/bbl) % 3.25 2808' cP 7.94 2648' Mud Condition Hycalog PDC 12.25 0.969 16552' 2808' 1-1-WT-A-E-IN-NO-TD 60 0-0-No-A-E-In-No-TD WOB 3 Hycalog PDC 0.00 2808' 0.969 Units* Lithology (%) Set At 2788' Cly Minimum Average 5 - 907-685-0772Unit Phone: - Kori Jo Plowman Maximum Report By:Logging Engineers:Kori Jo Plowman Daily Losses : 190 - -- Depth in / outTFA 97.00 54.40 16363' Gas Summary Bit Type YP 12.25 65/35 Ratio (lb/100ft2) Hycalog PDC - 1.117 13744' 4 X-65 - C-2 - Flow In (gpm) Siltst 2 1 - SPP (psi) Gallons/stroke LimeAlkal Xceed 675, EcoScope 675, TeleScope 675 Tools PV 24 hr Max Report For: 11-Oct-2015 11:59 PM Current Pump & Flow Data: NORTH SLOPE Avg ROP Current Depth 23200' 23200' 23200' 0' Max @ ft AK-AM-0902750623 Min Date: - in 20.00'' 8.75 0.902 ECD (ppg) 0' to ---- C-4i - C-5i 0-1-CT-T-X-IN-NO-TD Intermediate 43 C-5n 6837'23200' C-4n Tuff Chromatograph (ppm) (current) Sh 16 5-3-BT-C-X-IN-CT-TD Lst GvlCoalCht SiltSs Cement -- --- Trip Type Clyst C-3 (max) 16363' - - 178.9 Depth C-1 Comments Background -Connection - - Production = -- (max) Conductor Smith XR Milltooth 9.70 Size Footage 160' 113 16 out (sec/qt) 2808' NA Flow In (spm) Mud Type FAZEPRO 58.00 Mud Data MWD Summary 2 96% Avg 24 Hour Progress: Time:J. Keener/R.Wimmer - Lay Down DP Total Charges: Max - Morning Report Report # 66 Customer: Well: Area: Location: ENI PETROLEUM Yesterday's Depth: Current Depth: Rig: SP28-NW3 L1 Job No.: Daily Charges: SPY ISLAND DOYON15 Rig Activity: ROP (ft/hr) 4.23 API FLDensity (ppg) - - @ Oil / WaterViscosity 23200'2.50 L-80 12 Grade Surface RPM EVERMAR - Weld 1 56 Increase brine weight to 9.5, then 9.6, then 9.7 ppg for well control. POOH LEM running tool and L/D drill pipe (current) 10,000 Units-100% Gas In Air 9.70 Depth Bit # 16 5 WELL INFORMATION Created On : Oct 22 2015 Customer :ENI Petroleum Well Name :SP28-NW3 Job Number :AK-XX-0902655934 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 116.98 1.19 268.30 116.97 0.04 S 1.21 W 1.09 1.02 148.56 1.05 290.33 148.55 0.05 N 1.81 W 1.68 1.42 161.11 1.18 286.20 161.09 0.13 N 2.05 W 1.92 1.22 179.85 0.67 308.81 179.83 0.25 N 2.32 W 2.22 3.30 211.25 0.56 326.68 211.23 0.50 N 2.54 W 2.53 0.70 253.82 0.42 322.54 253.80 0.79 N 2.75 W 2.84 0.34 346.68 0.45 351.76 346.65 1.43 N 3.01 W 3.33 0.24 395.58 0.55 316.80 395.55 1.79 N 3.20 W 3.65 0.64 450.54 1.28 306.44 450.51 2.34 N 3.87 W 4.49 1.36 543.40 3.28 293.54 543.29 4.02 N 7.14 W 8.16 2.21 636.28 5.36 294.13 635.90 6.86 N 13.54 W 15.16 2.24 729.73 8.24 291.73 728.68 11.12 N 23.75 W 26.22 3.10 823.08 11.21 294.07 820.68 17.30 N 38.25 W 41.98 3.21 916.50 13.98 298.96 911.85 26.47 N 56.42 W 62.31 3.17 1009.85 17.07 298.95 1,001.78 38.56 N 78.28 W 87.20 3.31 1103.26 20.39 298.84 1,090.23 53.05 N 104.54 W 117.08 3.55 1196.58 22.56 296.24 1,177.07 68.81 N 134.84 W 151.17 2.54 1289.93 26.30 295.93 1,262.05 85.78 N 169.51 W 189.75 4.01 1383.24 27.50 296.38 1,345.26 104.39 N 207.40 W 231.93 1.30 1476.59 27.79 295.34 1,427.95 123.28 N 246.38 W 275.22 0.60 1569.96 28.41 297.20 1,510.32 142.75 N 285.80 W 319.16 1.15 1663.37 28.77 298.02 1,592.34 163.47 N 325.41 W 363.78 0.57 1756.75 28.69 298.67 1,674.22 184.78 N 364.92 W 408.53 0.35 1814.69 30.02 297.11 1,724.72 198.05 N 390.02 W 436.87 2.65 1908.05 31.45 295.26 1,804.97 219.09 N 432.84 W 484.54 1.84 2001.38 33.91 294.31 1,883.52 240.20 N 478.59 W 534.93 2.69 2094.70 34.81 294.87 1,960.55 262.12 N 526.48 W 587.59 1.02 2188.10 38.88 290.83 2,035.29 283.77 N 578.10 W 643.55 5.07 2281.41 40.25 292.18 2,107.23 305.56 N 633.39 W 702.92 1.73 2374.72 41.16 290.35 2,177.96 327.62 N 690.09 W 763.70 1.61 INSITE V8.3.0 Page 1Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2468.11 42.88 289.19 2,247.34 348.76 N 748.92 W 826.03 2.02 2561.76 49.50 289.68 2,312.14 371.25 N 812.61 W 893.36 7.08 2654.64 50.31 290.19 2,371.96 395.47 N 879.40 W 964.23 0.97 2726.97 53.84 289.70 2,416.41 414.93 N 933.03 W 1021.13 4.91 2824.89 55.07 291.60 2,473.34 443.03 N 1,007.57 W 1100.66 2.02 2918.27 56.94 292.22 2,525.54 471.92 N 1,079.40 W 1178.02 2.08 3011.60 60.65 293.25 2,573.89 502.78 N 1,153.00 W 1257.81 4.09 3105.04 64.85 292.88 2,616.67 535.31 N 1,229.42 W 1340.85 4.51 3198.40 67.92 292.18 2,654.06 568.08 N 1,308.42 W 1426.35 3.36 3291.88 72.62 291.56 2,685.61 600.84 N 1,390.06 W 1514.26 5.07 3385.30 76.71 291.38 2,710.31 633.81 N 1,473.88 W 1604.24 4.38 3478.73 79.00 289.77 2,729.97 665.90 N 1,559.39 W 1695.41 2.97 3572.08 80.73 287.35 2,746.40 695.14 N 1,646.50 W 1786.87 3.15 3665.46 82.27 284.78 2,760.20 720.69 N 1,735.23 W 1878.32 3.18 3758.86 84.37 283.03 2,771.06 742.98 N 1,825.27 W 1969.63 2.92 3852.22 86.18 280.24 2,778.76 761.74 N 1,916.39 W 2060.49 3.55 3945.62 88.52 278.74 2,783.07 777.12 N 2,008.41 W 2150.80 2.97 4038.98 88.49 279.12 2,785.51 791.60 N 2,100.60 W 2240.90 0.41 4132.38 88.14 279.34 2,788.26 806.58 N 2,192.75 W 2331.16 0.44 4225.72 88.40 278.86 2,791.07 821.33 N 2,284.88 W 2421.31 0.58 4319.13 88.44 279.47 2,793.65 836.21 N 2,377.06 W 2511.56 0.65 4412.48 87.55 279.38 2,796.92 851.48 N 2,469.09 W 2601.84 0.96 4505.87 87.87 278.86 2,800.65 866.27 N 2,561.23 W 2692.01 0.65 4599.20 88.27 278.96 2,803.79 880.72 N 2,653.38 W 2782.06 0.44 4692.55 87.92 278.88 2,806.89 895.19 N 2,745.55 W 2872.13 0.38 4785.82 87.99 278.29 2,810.22 909.10 N 2,837.71 W 2961.98 0.64 4879.19 87.98 278.20 2,813.51 922.48 N 2,930.06 W 3051.77 0.10 4972.51 87.39 278.65 2,817.27 936.14 N 3,022.30 W 3141.58 0.79 5065.76 87.60 279.27 2,821.35 950.65 N 3,114.32 W 3231.53 0.70 5159.11 88.52 279.24 2,824.51 965.66 N 3,206.40 W 3321.74 0.99 5252.44 88.02 278.65 2,827.33 980.16 N 3,298.56 W 3411.81 0.83 5345.77 88.40 279.24 2,830.24 994.67 N 3,390.70 W 3501.88 0.75 5439.26 88.61 279.63 2,832.68 1,009.99 N 3,482.90 W 3592.33 0.47 5532.59 88.21 279.01 2,835.27 1,025.10 N 3,574.96 W 3682.56 0.79 5625.95 88.16 279.37 2,838.23 1,040.00 N 3,667.08 W 3772.76 0.39 5719.25 88.23 279.94 2,841.17 1,055.64 N 3,759.01 W 3863.10 0.62 5812.75 87.98 279.48 2,844.26 1,071.40 N 3,851.12 W 3953.64 0.56 5906.08 87.87 280.02 2,847.64 1,087.20 N 3,943.04 W 4044.03 0.59 5999.54 87.96 280.37 2,851.04 1,103.73 N 4,034.96 W 4134.72 0.39 6092.89 88.11 280.11 2,854.24 1,120.31 N 4,126.77 W 4225.32 0.32 6186.24 87.89 279.87 2,857.50 1,136.50 N 4,218.65 W 4315.83 0.35 6279.62 88.02 280.14 2,860.83 1,152.71 N 4,310.55 W 4406.37 0.32 6372.99 88.00 282.16 2,864.07 1,170.75 N 4,402.10 W 4497.33 2.16 6466.35 88.55 282.09 2,866.88 1,190.35 N 4,493.33 W 4588.64 0.59 6559.62 87.35 281.71 2,870.22 1,209.57 N 4,584.54 W 4679.77 1.35 INSITE V8.3.0 Page 2Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6653.01 87.26 280.78 2,874.61 1,227.76 N 4,676.03 W 4770.74 1.00 6746.48 87.65 280.24 2,878.76 1,244.80 N 4,767.85 W 4861.53 0.71 6839.88 88.07 280.87 2,882.25 1,261.89 N 4,859.60 W 4952.29 0.81 6933.39 87.84 280.45 2,885.59 1,279.18 N 4,951.44 W 5043.21 0.51 7026.77 87.85 280.42 2,889.10 1,296.08 N 5,043.21 W 5133.91 0.03 7120.06 87.60 279.33 2,892.80 1,312.07 N 5,135.04 W 5224.29 1.20 7213.54 88.10 279.28 2,896.31 1,327.17 N 5,227.23 W 5314.64 0.54 7306.87 87.84 277.60 2,899.61 1,340.86 N 5,319.48 W 5404.48 1.82 7400.27 87.88 277.99 2,903.10 1,353.52 N 5,411.96 W 5494.09 0.42 7493.65 87.90 278.13 2,906.54 1,366.60 N 5,504.35 W 5583.80 0.15 7587.02 88.19 277.84 2,909.73 1,379.57 N 5,596.76 W 5673.48 0.44 7680.35 88.49 278.46 2,912.43 1,392.79 N 5,689.11 W 5763.21 0.74 7773.73 88.15 278.79 2,915.17 1,406.79 N 5,781.39 W 5853.20 0.51 7867.18 88.19 279.55 2,918.15 1,421.67 N 5,873.60 W 5943.48 0.81 7960.56 88.14 278.45 2,921.14 1,436.27 N 5,965.78 W 6033.62 1.18 8054.04 88.86 279.43 2,923.59 1,450.80 N 6,058.10 W 6123.84 1.30 8147.43 88.15 279.53 2,926.02 1,466.17 N 6,150.18 W 6214.20 0.77 8240.76 87.87 279.10 2,929.27 1,481.27 N 6,242.22 W 6304.42 0.55 8334.11 87.71 279.10 2,932.87 1,496.02 N 6,334.33 W 6394.55 0.17 8427.44 88.25 280.60 2,936.16 1,511.98 N 6,426.22 W 6484.98 1.71 8520.73 87.56 280.19 2,939.57 1,528.80 N 6,517.92 W 6575.58 0.86 8614.15 87.94 280.49 2,943.23 1,545.55 N 6,609.75 W 6666.27 0.52 8707.57 88.95 281.11 2,945.77 1,563.05 N 6,701.48 W 6757.18 1.27 8800.90 89.45 282.21 2,947.07 1,581.91 N 6,792.87 W 6848.33 1.29 8894.21 88.00 281.82 2,949.15 1,601.33 N 6,884.11 W 6939.57 1.61 8987.59 87.88 281.76 2,952.50 1,620.40 N 6,975.47 W 7030.77 0.14 9080.97 86.56 280.29 2,957.03 1,638.24 N 7,067.01 W 7121.64 2.11 9174.36 88.22 278.81 2,961.29 1,653.71 N 7,159.00 W 7211.97 2.38 9267.70 87.88 279.36 2,964.46 1,668.44 N 7,251.12 W 7302.10 0.69 9361.14 88.26 279.48 2,967.61 1,683.73 N 7,343.25 W 7392.46 0.43 9454.61 88.22 279.01 2,970.48 1,698.74 N 7,435.46 W 7482.80 0.50 9547.98 88.25 279.29 2,973.36 1,713.58 N 7,527.60 W 7572.99 0.30 9641.39 88.34 278.61 2,976.14 1,728.10 N 7,619.83 W 7663.15 0.73 9734.77 87.30 278.92 2,979.69 1,742.32 N 7,712.05 W 7753.16 1.16 9828.17 87.36 279.25 2,984.04 1,757.05 N 7,804.18 W 7843.31 0.36 9921.56 87.24 278.94 2,988.44 1,771.80 N 7,896.29 W 7933.44 0.36 10015.01 87.34 278.52 2,992.86 1,785.97 N 7,988.55 W 8023.48 0.46 10108.08 86.96 278.93 2,997.48 1,800.07 N 8,080.43 W 8113.14 0.60 10201.42 87.72 277.78 3,001.82 1,813.61 N 8,172.68 W 8202.91 1.48 10294.79 87.87 277.80 3,005.41 1,826.26 N 8,265.12 W 8292.48 0.16 10388.21 88.32 278.27 3,008.51 1,839.31 N 8,357.57 W 8382.24 0.70 10481.55 88.27 278.39 3,011.29 1,852.83 N 8,449.89 W 8472.05 0.14 10574.88 88.28 277.86 3,014.10 1,866.01 N 8,542.24 W 8561.77 0.57 10668.10 88.13 277.75 3,017.02 1,878.66 N 8,634.55 W 8651.23 0.20 10761.41 88.08 278.22 3,020.11 1,891.62 N 8,726.90 W 8740.86 0.51 INSITE V8.3.0 Page 3Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10854.81 87.76 278.47 3,023.50 1,905.17 N 8,819.25 W 8830.72 0.43 10948.19 88.35 279.03 3,026.67 1,919.36 N 8,911.49 W 8920.75 0.87 11041.57 88.44 279.48 3,029.28 1,934.37 N 9,003.62 W 9011.01 0.49 11134.97 88.89 279.45 3,031.46 1,949.73 N 9,095.72 W 9101.38 0.48 11228.37 87.86 278.95 3,034.11 1,964.66 N 9,187.88 W 9191.63 1.23 11321.73 88.16 279.64 3,037.35 1,979.73 N 9,279.96 W 9281.87 0.81 11415.12 88.55 279.99 3,040.03 1,995.64 N 9,371.95 W 9372.36 0.56 11508.51 88.45 279.58 3,042.47 2,011.51 N 9,463.95 W 9462.84 0.45 11601.92 88.34 279.61 3,045.09 2,027.07 N 9,556.01 W 9553.27 0.12 11695.33 88.04 279.82 3,048.04 2,042.82 N 9,648.04 W 9643.74 0.39 11788.67 87.80 279.68 3,051.43 2,058.62 N 9,739.97 W 9734.13 0.30 11882.02 88.18 279.82 3,054.70 2,074.42 N 9,831.91 W 9824.54 0.43 11975.38 87.82 279.89 3,057.96 2,090.39 N 9,923.84 W 9915.00 0.39 12068.70 88.28 280.58 3,061.14 2,106.96 N 10,015.62 W 10005.58 0.89 12161.83 87.62 279.86 3,064.47 2,123.47 N 10,107.21 W 10095.96 1.05 12255.17 87.79 280.05 3,068.21 2,139.60 N 10,199.07 W 10186.42 0.27 12348.42 87.85 280.46 3,071.75 2,156.19 N 10,290.77 W 10276.92 0.44 12441.72 87.69 280.44 3,075.38 2,173.10 N 10,382.45 W 10367.55 0.17 12535.09 88.02 279.56 3,078.88 2,189.30 N 10,474.34 W 10458.07 1.01 12628.49 86.35 279.78 3,083.46 2,204.97 N 10,566.30 W 10548.44 1.80 12721.88 84.96 280.02 3,090.54 2,220.98 N 10,658.03 W 10638.74 1.51 12815.20 83.26 278.80 3,100.12 2,236.15 N 10,749.60 W 10728.56 2.24 12908.53 81.14 279.24 3,112.78 2,250.65 N 10,840.92 W 10817.86 2.32 13001.89 79.25 279.14 3,128.68 2,265.34 N 10,931.73 W 10906.79 2.03 13095.20 78.82 278.71 3,146.43 2,279.55 N 11,022.23 W 10995.23 0.65 13188.58 78.54 279.32 3,164.76 2,293.90 N 11,112.66 W 11083.66 0.71 13281.83 78.36 279.56 3,183.43 2,308.88 N 11,202.78 W 11172.08 0.32 13375.22 79.51 279.86 3,201.35 2,324.34 N 11,293.12 W 11260.88 1.27 13468.48 79.51 280.87 3,218.33 2,340.84 N 11,383.33 W 11349.99 1.06 13561.73 79.38 281.02 3,235.41 2,358.25 N 11,473.33 W 11439.28 0.21 13655.07 79.38 280.62 3,252.62 2,375.47 N 11,563.44 W 11528.59 0.42 13748.45 79.60 282.16 3,269.65 2,393.60 N 11,653.44 W 11618.18 1.64 13841.85 79.37 281.91 3,286.69 2,412.75 N 11,743.26 W 11708.00 0.36 13935.30 78.78 281.67 3,304.41 2,431.50 N 11,833.08 W 11797.67 0.68 14028.72 78.98 281.81 3,322.42 2,450.15 N 11,922.82 W 11887.24 0.26 14122.07 79.09 280.97 3,340.18 2,468.25 N 12,012.66 W 11976.66 0.89 14215.42 79.26 280.59 3,357.71 2,485.40 N 12,102.73 W 12065.91 0.44 14308.83 78.81 279.31 3,375.48 2,501.24 N 12,193.06 W 12154.86 1.43 14402.15 78.78 279.17 3,393.61 2,515.94 N 12,283.41 W 12243.37 0.15 14495.50 79.61 279.02 3,411.11 2,530.43 N 12,373.95 W 12331.96 0.90 14588.81 78.58 280.63 3,428.77 2,546.07 N 12,464.23 W 12420.78 2.02 14682.16 79.04 283.19 3,446.89 2,564.96 N 12,553.83 W 12510.31 2.73 14775.53 79.38 285.65 3,464.37 2,587.80 N 12,642.65 W 12600.73 2.61 14868.94 80.02 287.82 3,481.07 2,614.27 N 12,730.65 W 12691.89 2.39 14962.32 81.80 290.55 3,495.83 2,644.57 N 12,817.73 W 12783.75 3.46 INSITE V8.3.0 Page 4Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 15055.66 83.51 293.40 3,507.76 2,679.21 N 12,903.56 W 12876.25 3.54 15149.02 83.92 296.11 3,517.98 2,718.07 N 12,987.82 W 12969.04 2.92 15242.35 84.51 298.98 3,527.39 2,761.00 N 13,070.14 W 13061.71 3.12 15335.67 84.73 301.77 3,536.14 2,807.98 N 13,150.29 W 13154.04 2.99 15429.06 84.73 303.31 3,544.72 2,858.00 N 13,228.68 W 13246.01 1.64 15522.38 85.44 306.24 3,552.72 2,911.02 N 13,305.04 W 13337.34 3.22 15615.69 86.32 309.14 3,559.43 2,967.92 N 13,378.68 W 13427.77 3.24 15709.08 86.65 311.62 3,565.15 3,028.30 N 13,449.69 W 13517.21 2.67 15802.21 87.79 312.74 3,569.67 3,090.76 N 13,518.61 W 13605.59 1.72 15895.61 87.12 313.78 3,573.82 3,154.70 N 13,586.56 W 13693.69 1.32 15989.06 86.94 312.86 3,578.66 3,218.73 N 13,654.46 W 13781.78 1.00 16082.31 87.47 314.13 3,583.21 3,282.84 N 13,722.03 W 13869.59 1.47 16175.65 86.26 314.29 3,588.31 3,347.82 N 13,788.83 W 13957.07 1.31 16268.89 86.34 314.45 3,594.33 3,412.89 N 13,855.34 W 14044.31 0.19 16362.20 85.01 314.21 3,601.36 3,477.90 N 13,921.90 W 14131.58 1.45 16455.52 85.47 313.25 3,609.11 3,542.19 N 13,989.10 W 14219.13 1.14 16517.79 87.10 313.30 3,613.14 3,584.78 N 14,034.34 W 14277.79 2.62 16562.00 87.10 313.30 3,615.38 3,615.07 N 14,066.47 W 14319.47 0.00 16617.12 87.35 313.63 3,618.05 3,652.94 N 14,106.43 W 14371.39 0.75 16711.80 87.07 313.73 3,622.66 3,718.25 N 14,174.82 W 14460.45 0.31 16806.83 86.97 311.85 3,627.60 3,782.71 N 14,244.46 W 14550.31 1.98 16901.72 90.24 311.69 3,629.91 3,845.90 N 14,315.20 W 14640.65 3.45 16996.82 87.51 310.04 3,631.77 3,908.10 N 14,387.10 W 14731.64 3.35 17091.62 88.30 310.13 3,635.24 3,969.10 N 14,459.58 W 14822.68 0.84 17186.60 89.32 312.99 3,637.21 4,032.09 N 14,530.63 W 14913.22 3.20 17281.64 88.16 311.45 3,639.30 4,095.94 N 14,600.99 W 15003.49 2.03 17376.92 86.19 308.09 3,644.00 4,156.81 N 14,674.12 W 15095.06 4.08 17471.41 87.49 305.82 3,649.21 4,213.52 N 14,749.51 W 15187.01 2.77 17566.05 89.43 303.83 3,651.75 4,267.54 N 14,827.16 W 15279.93 2.94 17660.99 90.15 301.32 3,652.10 4,318.65 N 14,907.16 W 15373.81 2.75 17756.14 91.71 300.38 3,650.56 4,367.43 N 14,988.83 W 15468.27 1.91 17850.91 92.22 298.50 3,647.31 4,413.99 N 15,071.31 W 15562.56 2.05 17945.98 90.87 300.14 3,644.74 4,460.52 N 15,154.17 W 15657.18 2.23 18040.81 90.12 299.11 3,643.92 4,507.39 N 15,236.60 W 15751.56 1.34 18135.58 90.20 300.87 3,643.66 4,554.76 N 15,318.68 W 15845.81 1.86 18230.51 92.33 303.94 3,641.56 4,605.61 N 15,398.79 W 15939.69 3.94 18325.57 90.09 302.12 3,639.56 4,657.41 N 15,478.46 W 16033.55 3.04 18420.21 89.75 300.70 3,639.69 4,706.73 N 15,559.23 W 16127.40 1.54 18515.12 91.03 299.88 3,639.04 4,754.60 N 15,641.18 W 16221.74 1.60 18609.88 95.24 299.57 3,633.86 4,801.51 N 15,723.33 W 16315.87 4.45 18704.89 96.70 298.96 3,623.98 4,847.70 N 15,805.76 W 16409.97 1.66 18799.82 99.12 298.05 3,610.92 4,892.57 N 15,888.38 W 16503.70 2.72 18894.86 98.58 299.99 3,596.29 4,938.12 N 15,970.49 W 16597.25 2.10 18989.64 95.61 300.76 3,584.59 4,985.68 N 16,051.63 W 16690.71 3.24 19084.49 92.56 301.88 3,577.83 5,034.85 N 16,132.44 W 16784.54 3.42 INSITE V8.3.0 Page 5Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 19179.33 89.57 302.19 3,576.07 5,085.15 N 16,212.81 W 16878.44 3.17 19274.02 89.71 304.12 3,576.66 5,136.93 N 16,292.08 W 16971.92 2.04 19369.11 90.98 305.26 3,576.09 5,191.04 N 16,370.26 W 17065.36 1.79 19464.23 91.84 307.55 3,573.75 5,247.48 N 16,446.79 W 17158.24 2.57 19558.92 91.07 309.56 3,571.35 5,306.47 N 16,520.81 W 17249.87 2.27 19653.75 90.84 311.74 3,569.77 5,368.23 N 16,592.74 W 17340.72 2.31 19748.72 90.11 312.35 3,568.98 5,431.83 N 16,663.27 W 17431.03 1.00 19843.78 89.23 310.39 3,569.53 5,494.66 N 16,734.60 W 17521.76 2.26 19938.54 90.34 309.06 3,569.88 5,555.21 N 16,807.48 W 17612.98 1.83 20033.39 91.25 308.82 3,568.57 5,614.82 N 16,881.25 W 17704.63 0.99 20128.21 90.04 305.69 3,567.50 5,672.21 N 16,956.70 W 17796.92 3.54 20223.05 90.46 304.23 3,567.08 5,726.55 N 17,034.43 W 17890.03 1.60 20318.31 90.34 302.00 3,566.42 5,778.59 N 17,114.21 W 17984.09 2.34 20411.65 93.62 306.22 3,563.19 5,830.88 N 17,191.42 W 18075.90 5.72 20505.00 91.76 311.50 3,558.81 5,889.36 N 17,264.00 W 18166.00 5.99 20598.36 90.35 313.63 3,557.09 5,952.50 N 17,332.74 W 18254.50 2.74 20691.68 88.50 312.68 3,558.03 6,016.32 N 17,400.81 W 18342.66 2.23 20784.81 89.11 313.91 3,559.97 6,080.17 N 17,468.58 W 18430.55 1.47 20878.50 89.81 315.27 3,560.85 6,145.94 N 17,535.29 W 18518.27 1.63 20971.40 87.60 317.88 3,562.95 6,213.38 N 17,599.13 W 18604.04 3.68 21064.70 88.40 316.24 3,566.21 6,281.64 N 17,662.64 W 18689.84 1.95 21158.07 89.86 315.44 3,567.63 6,348.61 N 17,727.68 W 18776.52 1.78 21251.47 91.13 312.89 3,566.82 6,413.68 N 17,794.67 W 18864.20 3.05 21344.86 91.78 312.09 3,564.45 6,476.74 N 17,863.51 W 18952.75 1.10 21438.18 91.09 313.74 3,562.11 6,540.26 N 17,931.83 W 19041.02 1.92 21531.51 89.95 314.40 3,561.26 6,605.17 N 17,998.89 W 19128.69 1.41 21624.87 90.37 315.63 3,561.00 6,671.20 N 18,064.88 W 19215.86 1.39 21718.18 88.42 315.78 3,561.99 6,737.98 N 18,130.04 W 19302.56 2.10 21811.56 88.67 317.36 3,564.36 6,805.77 N 18,194.21 W 19388.78 1.71 21904.81 85.94 316.92 3,568.74 6,874.04 N 18,257.57 W 19474.44 2.97 21998.20 88.66 317.58 3,573.14 6,942.54 N 18,320.88 W 19560.16 3.00 22091.46 87.86 316.49 3,575.97 7,010.75 N 18,384.41 W 19645.96 1.45 22184.71 87.93 313.52 3,579.40 7,076.64 N 18,450.29 W 19732.96 3.18 22278.05 88.34 312.36 3,582.44 7,140.19 N 18,518.59 W 19821.22 1.32 22371.43 89.91 312.51 3,583.86 7,203.19 N 18,587.50 W 19909.81 1.69 22464.83 90.47 312.72 3,583.55 7,266.43 N 18,656.23 W 19998.34 0.64 22558.28 90.42 311.75 3,582.83 7,329.24 N 18,725.42 W 20087.11 1.04 22651.70 91.50 312.34 3,581.26 7,391.79 N 18,794.78 W 20175.93 1.32 22745.05 90.77 312.37 3,579.41 7,454.67 N 18,863.75 W 20264.53 0.78 22838.40 90.02 313.32 3,578.77 7,518.15 N 18,932.19 W 20352.89 1.30 22931.81 89.40 313.76 3,579.24 7,582.50 N 18,999.90 W 20440.93 0.81 23025.13 91.94 315.25 3,578.15 7,647.90 N 19,066.45 W 20528.34 3.16 23118.48 91.41 315.40 3,575.42 7,714.25 N 19,132.05 W 20615.28 0.59 23211.79 91.59 313.43 3,572.98 7,779.53 N 19,198.68 W 20702.71 2.12 23305.14 89.65 311.78 3,571.97 7,842.71 N 19,267.38 W 20791.19 2.73 INSITE V8.3.0 Page 6Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 23398.60 92.12 311.87 3,570.53 7,905.02 N 19,337.01 W 20880.16 2.64 23491.92 92.09 312.23 3,567.10 7,967.49 N 19,406.26 W 20968.84 0.39 23585.23 90.65 312.40 3,564.87 8,030.28 N 19,475.23 W 21057.41 1.55 23678.64 89.15 311.53 3,565.03 8,092.74 N 19,544.69 W 21146.28 1.86 23772.00 90.39 312.10 3,565.41 8,154.99 N 19,614.26 W 21235.17 1.46 23865.33 90.83 312.20 3,564.41 8,217.61 N 19,683.45 W 21323.87 0.48 23958.65 89.98 313.40 3,563.75 8,281.01 N 19,751.92 W 21412.22 1.58 24052.39 89.76 314.64 3,563.97 8,346.15 N 19,819.33 W 21500.31 1.34 24145.36 89.86 315.10 3,564.27 8,411.74 N 19,885.22 W 21587.20 0.51 24238.76 89.84 315.70 3,564.52 8,478.25 N 19,950.80 W 21674.18 0.64 24332.06 87.19 314.77 3,566.94 8,544.46 N 20,016.47 W 21761.12 3.01 24425.19 87.61 314.79 3,571.16 8,609.99 N 20,082.51 W 21848.12 0.45 24518.59 91.44 314.31 3,571.94 8,675.50 N 20,149.05 W 21935.58 4.13 24612.04 92.59 313.72 3,568.65 8,740.39 N 20,216.22 W 22023.34 1.38 24705.29 91.76 313.91 3,565.11 8,804.91 N 20,283.45 W 22111.02 0.91 24798.63 92.12 313.68 3,561.95 8,869.47 N 20,350.79 W 22198.81 0.46 24891.87 92.91 311.96 3,557.86 8,932.78 N 20,419.11 W 22287.00 2.03 24918.70 93.40 311.18 3,556.38 8,950.55 N 20,439.15 W 22312.54 3.43 24986.00 93.40 311.18 3,552.39 8,994.79 N 20,489.72 W 22376.73 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 294.03 degrees (True) - A total correction of 18.82 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 24,986.00 feet is 22,377.10 feet along 293.70 degrees (True) INSITE V8.3.0 Page 7Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.3.0 Page 8Job No:AK-XX-0902655934 Well Name:SP28-NW3 Survey Report WELL INFORMATION Created On : Oct 22 2015 Customer :ENI Petroleum Well Name :SP28-NW3 L1 Job Number :AK-XX-0902750623 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report SURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 116.98 1.19 268.30 116.97 0.04 S 1.21 W 1.09 1.02 148.56 1.05 290.33 148.55 0.05 N 1.81 W 1.68 1.42 161.11 1.18 286.20 161.09 0.13 N 2.05 W 1.92 1.22 179.85 0.67 308.81 179.83 0.25 N 2.32 W 2.22 3.30 211.25 0.56 326.68 211.23 0.50 N 2.54 W 2.53 0.70 253.82 0.42 322.54 253.80 0.79 N 2.75 W 2.84 0.34 346.68 0.45 351.76 346.65 1.43 N 3.01 W 3.33 0.24 395.58 0.55 316.80 395.55 1.79 N 3.20 W 3.65 0.64 450.54 1.28 306.44 450.51 2.34 N 3.87 W 4.49 1.36 543.40 3.28 293.54 543.29 4.02 N 7.14 W 8.16 2.21 636.28 5.36 294.13 635.90 6.86 N 13.54 W 15.16 2.24 729.73 8.24 291.73 728.68 11.12 N 23.75 W 26.22 3.10 823.08 11.21 294.07 820.68 17.30 N 38.25 W 41.98 3.21 916.50 13.98 298.96 911.85 26.47 N 56.42 W 62.31 3.17 1009.85 17.07 298.95 1,001.78 38.56 N 78.28 W 87.20 3.31 1103.26 20.39 298.84 1,090.23 53.05 N 104.54 W 117.08 3.55 1196.58 22.56 296.24 1,177.07 68.81 N 134.84 W 151.17 2.54 1289.93 26.30 295.93 1,262.05 85.78 N 169.51 W 189.75 4.01 1383.24 27.50 296.38 1,345.26 104.39 N 207.40 W 231.93 1.30 1476.59 27.79 295.34 1,427.95 123.28 N 246.38 W 275.22 0.60 1569.96 28.41 297.20 1,510.32 142.75 N 285.80 W 319.16 1.15 1663.37 28.77 298.02 1,592.34 163.47 N 325.41 W 363.78 0.57 1756.75 28.69 298.67 1,674.22 184.78 N 364.92 W 408.53 0.35 1814.69 30.02 297.11 1,724.72 198.05 N 390.02 W 436.87 2.65 1908.05 31.45 295.26 1,804.97 219.09 N 432.84 W 484.54 1.84 2001.38 33.91 294.31 1,883.52 240.20 N 478.59 W 534.93 2.69 2094.70 34.81 294.87 1,960.55 262.12 N 526.48 W 587.59 1.02 2188.10 38.88 290.83 2,035.29 283.77 N 578.10 W 643.55 5.07 2281.41 40.25 292.18 2,107.23 305.56 N 633.39 W 702.92 1.73 2374.72 41.16 290.35 2,177.96 327.62 N 690.09 W 763.70 1.61 INSITE V8.3.0 Page 1Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2468.11 42.88 289.19 2,247.34 348.76 N 748.92 W 826.03 2.02 2561.76 49.50 289.68 2,312.14 371.25 N 812.61 W 893.36 7.08 2654.64 50.31 290.19 2,371.96 395.47 N 879.40 W 964.23 0.97 2726.97 53.84 289.70 2,416.41 414.93 N 933.03 W 1021.13 4.91 2824.89 55.07 291.60 2,473.34 443.03 N 1,007.57 W 1100.66 2.02 2918.27 56.94 292.22 2,525.54 471.92 N 1,079.40 W 1178.02 2.08 3011.60 60.65 293.25 2,573.89 502.78 N 1,153.00 W 1257.81 4.09 3105.04 64.85 292.88 2,616.67 535.31 N 1,229.42 W 1340.85 4.51 3198.40 67.92 292.18 2,654.06 568.08 N 1,308.42 W 1426.35 3.36 3291.88 72.62 291.56 2,685.61 600.84 N 1,390.06 W 1514.26 5.07 3385.30 76.71 291.38 2,710.31 633.81 N 1,473.88 W 1604.24 4.38 3478.73 79.00 289.77 2,729.97 665.90 N 1,559.39 W 1695.41 2.97 3572.08 80.73 287.35 2,746.40 695.14 N 1,646.50 W 1786.87 3.15 3665.46 82.27 284.78 2,760.20 720.69 N 1,735.23 W 1878.32 3.18 3758.86 84.37 283.03 2,771.06 742.98 N 1,825.27 W 1969.63 2.92 3852.22 86.18 280.24 2,778.76 761.74 N 1,916.39 W 2060.49 3.55 3945.62 88.52 278.74 2,783.07 777.12 N 2,008.41 W 2150.80 2.97 4038.98 88.49 279.12 2,785.51 791.60 N 2,100.60 W 2240.90 0.41 4132.38 88.14 279.34 2,788.26 806.58 N 2,192.75 W 2331.16 0.44 4225.72 88.40 278.86 2,791.07 821.33 N 2,284.88 W 2421.31 0.58 4319.13 88.44 279.47 2,793.65 836.21 N 2,377.06 W 2511.56 0.65 4412.48 87.55 279.38 2,796.92 851.48 N 2,469.09 W 2601.84 0.96 4505.87 87.87 278.86 2,800.65 866.27 N 2,561.23 W 2692.01 0.65 4599.20 88.27 278.96 2,803.79 880.72 N 2,653.38 W 2782.06 0.44 4692.55 87.92 278.88 2,806.89 895.19 N 2,745.55 W 2872.13 0.38 4785.82 87.99 278.29 2,810.22 909.10 N 2,837.71 W 2961.98 0.64 4879.19 87.98 278.20 2,813.51 922.48 N 2,930.06 W 3051.77 0.10 4972.51 87.39 278.65 2,817.27 936.14 N 3,022.30 W 3141.58 0.79 5065.76 87.60 279.27 2,821.35 950.65 N 3,114.32 W 3231.53 0.70 5159.11 88.52 279.24 2,824.51 965.66 N 3,206.40 W 3321.74 0.99 5252.44 88.02 278.65 2,827.33 980.16 N 3,298.56 W 3411.81 0.83 5345.77 88.40 279.24 2,830.24 994.67 N 3,390.70 W 3501.88 0.75 5439.26 88.61 279.63 2,832.68 1,009.99 N 3,482.90 W 3592.33 0.47 5532.59 88.21 279.01 2,835.27 1,025.10 N 3,574.96 W 3682.56 0.79 5625.95 88.16 279.37 2,838.23 1,040.00 N 3,667.08 W 3772.76 0.39 5719.25 88.23 279.94 2,841.17 1,055.64 N 3,759.01 W 3863.10 0.62 5812.75 87.98 279.48 2,844.26 1,071.40 N 3,851.12 W 3953.64 0.56 5906.08 87.87 280.02 2,847.64 1,087.20 N 3,943.04 W 4044.03 0.59 5999.54 87.96 280.37 2,851.04 1,103.73 N 4,034.96 W 4134.72 0.39 6092.89 88.11 280.11 2,854.24 1,120.31 N 4,126.77 W 4225.32 0.32 6186.24 87.89 279.87 2,857.50 1,136.50 N 4,218.65 W 4315.83 0.35 6279.62 88.02 280.14 2,860.83 1,152.71 N 4,310.55 W 4406.37 0.32 6372.99 88.00 282.16 2,864.07 1,170.75 N 4,402.10 W 4497.33 2.16 6466.35 88.55 282.09 2,866.88 1,190.35 N 4,493.33 W 4588.64 0.59 6559.62 87.35 281.71 2,870.22 1,209.57 N 4,584.54 W 4679.77 1.35 INSITE V8.3.0 Page 2Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 6653.01 87.26 280.78 2,874.61 1,227.76 N 4,676.03 W 4770.74 1.00 6746.48 87.65 280.24 2,878.76 1,244.80 N 4,767.85 W 4861.53 0.71 6839.88 88.07 280.87 2,882.25 1,261.89 N 4,859.60 W 4952.29 0.81 6933.39 87.84 280.45 2,885.59 1,279.18 N 4,951.44 W 5043.21 0.51 7026.77 87.85 280.42 2,889.10 1,296.08 N 5,043.21 W 5133.91 0.03 7120.06 87.60 279.33 2,892.80 1,312.07 N 5,135.04 W 5224.29 1.20 7213.54 88.10 279.28 2,896.31 1,327.17 N 5,227.23 W 5314.64 0.54 7306.87 87.84 277.60 2,899.61 1,340.86 N 5,319.48 W 5404.48 1.82 7400.27 87.88 277.99 2,903.10 1,353.52 N 5,411.96 W 5494.09 0.42 7493.65 87.90 278.13 2,906.54 1,366.60 N 5,504.35 W 5583.80 0.15 7587.02 88.19 277.84 2,909.73 1,379.57 N 5,596.76 W 5673.48 0.44 7680.35 88.49 278.46 2,912.43 1,392.79 N 5,689.11 W 5763.21 0.74 7773.73 88.15 278.79 2,915.17 1,406.79 N 5,781.39 W 5853.20 0.51 7867.18 88.19 279.55 2,918.15 1,421.67 N 5,873.60 W 5943.48 0.81 7960.56 88.14 278.45 2,921.14 1,436.27 N 5,965.78 W 6033.62 1.18 8054.04 88.86 279.43 2,923.59 1,450.80 N 6,058.10 W 6123.84 1.30 8147.43 88.15 279.53 2,926.02 1,466.17 N 6,150.18 W 6214.20 0.77 8240.76 87.87 279.10 2,929.27 1,481.27 N 6,242.22 W 6304.42 0.55 8334.11 87.71 279.10 2,932.87 1,496.02 N 6,334.33 W 6394.55 0.17 8427.44 88.25 280.60 2,936.16 1,511.98 N 6,426.22 W 6484.98 1.71 8520.73 87.56 280.19 2,939.57 1,528.80 N 6,517.92 W 6575.58 0.86 8614.15 87.94 280.49 2,943.23 1,545.55 N 6,609.75 W 6666.27 0.52 8707.57 88.95 281.11 2,945.77 1,563.05 N 6,701.48 W 6757.18 1.27 8800.90 89.45 282.21 2,947.07 1,581.91 N 6,792.87 W 6848.33 1.29 8894.21 88.00 281.82 2,949.15 1,601.33 N 6,884.11 W 6939.57 1.61 8987.59 87.88 281.76 2,952.50 1,620.40 N 6,975.47 W 7030.77 0.14 9080.97 86.56 280.29 2,957.03 1,638.24 N 7,067.01 W 7121.64 2.11 9174.36 88.22 278.81 2,961.29 1,653.71 N 7,159.00 W 7211.97 2.38 9267.70 87.88 279.36 2,964.46 1,668.44 N 7,251.12 W 7302.10 0.69 9361.14 88.26 279.48 2,967.61 1,683.73 N 7,343.25 W 7392.46 0.43 9454.61 88.22 279.01 2,970.48 1,698.74 N 7,435.46 W 7482.80 0.50 9547.98 88.25 279.29 2,973.36 1,713.58 N 7,527.60 W 7572.99 0.30 9641.39 88.34 278.61 2,976.14 1,728.10 N 7,619.83 W 7663.15 0.73 9734.77 87.30 278.92 2,979.69 1,742.32 N 7,712.05 W 7753.16 1.16 9828.17 87.36 279.25 2,984.04 1,757.05 N 7,804.18 W 7843.31 0.36 9921.56 87.24 278.94 2,988.44 1,771.80 N 7,896.29 W 7933.44 0.36 10015.01 87.34 278.52 2,992.86 1,785.97 N 7,988.55 W 8023.48 0.46 10108.08 86.96 278.93 2,997.48 1,800.07 N 8,080.43 W 8113.14 0.60 10201.42 87.72 277.78 3,001.82 1,813.61 N 8,172.68 W 8202.91 1.48 10294.79 87.87 277.80 3,005.41 1,826.26 N 8,265.12 W 8292.48 0.16 10388.21 88.32 278.27 3,008.51 1,839.31 N 8,357.57 W 8382.24 0.70 10481.55 88.27 278.39 3,011.29 1,852.83 N 8,449.89 W 8472.05 0.14 10574.88 88.28 277.86 3,014.10 1,866.01 N 8,542.24 W 8561.77 0.57 10668.10 88.13 277.75 3,017.02 1,878.66 N 8,634.55 W 8651.23 0.20 10761.41 88.08 278.22 3,020.11 1,891.62 N 8,726.90 W 8740.86 0.51 INSITE V8.3.0 Page 3Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 10854.81 87.76 278.47 3,023.50 1,905.17 N 8,819.25 W 8830.72 0.43 10948.19 88.35 279.03 3,026.67 1,919.36 N 8,911.49 W 8920.75 0.87 11041.57 88.44 279.48 3,029.28 1,934.37 N 9,003.62 W 9011.01 0.49 11134.97 88.89 279.45 3,031.46 1,949.73 N 9,095.72 W 9101.38 0.48 11228.37 87.86 278.95 3,034.11 1,964.66 N 9,187.88 W 9191.63 1.23 11321.73 88.16 279.64 3,037.35 1,979.73 N 9,279.96 W 9281.87 0.81 11415.12 88.55 279.99 3,040.03 1,995.64 N 9,371.95 W 9372.36 0.56 11508.51 88.45 279.58 3,042.47 2,011.51 N 9,463.95 W 9462.84 0.45 11601.92 88.34 279.61 3,045.09 2,027.07 N 9,556.01 W 9553.27 0.12 11695.33 88.04 279.82 3,048.04 2,042.82 N 9,648.04 W 9643.74 0.39 11788.67 87.80 279.68 3,051.43 2,058.62 N 9,739.97 W 9734.13 0.30 11882.02 88.18 279.82 3,054.70 2,074.42 N 9,831.91 W 9824.54 0.43 11975.38 87.82 279.89 3,057.96 2,090.39 N 9,923.84 W 9915.00 0.39 12068.70 88.28 280.58 3,061.14 2,106.96 N 10,015.62 W 10005.58 0.89 12161.83 87.62 279.86 3,064.47 2,123.47 N 10,107.21 W 10095.96 1.05 12255.17 87.79 280.05 3,068.21 2,139.60 N 10,199.07 W 10186.42 0.27 12348.42 87.85 280.46 3,071.75 2,156.19 N 10,290.77 W 10276.92 0.44 12441.72 87.69 280.44 3,075.38 2,173.10 N 10,382.45 W 10367.55 0.17 12535.09 88.02 279.56 3,078.88 2,189.30 N 10,474.34 W 10458.07 1.01 12628.49 86.35 279.78 3,083.46 2,204.97 N 10,566.30 W 10548.44 1.80 12721.88 84.96 280.02 3,090.54 2,220.98 N 10,658.03 W 10638.74 1.51 12815.20 83.26 278.80 3,100.12 2,236.15 N 10,749.60 W 10728.56 2.24 12908.53 81.14 279.24 3,112.78 2,250.65 N 10,840.92 W 10817.86 2.32 13001.89 79.25 279.14 3,128.68 2,265.34 N 10,931.73 W 10906.79 2.03 13095.20 78.82 278.71 3,146.43 2,279.55 N 11,022.23 W 10995.23 0.65 13188.58 78.54 279.32 3,164.76 2,293.90 N 11,112.66 W 11083.66 0.71 13281.83 78.36 279.56 3,183.43 2,308.88 N 11,202.78 W 11172.08 0.32 13375.22 79.51 279.86 3,201.35 2,324.34 N 11,293.12 W 11260.88 1.27 13468.48 79.51 280.87 3,218.33 2,340.84 N 11,383.33 W 11349.99 1.06 13561.73 79.38 281.02 3,235.41 2,358.25 N 11,473.33 W 11439.28 0.21 13655.07 79.38 280.62 3,252.62 2,375.47 N 11,563.44 W 11528.59 0.42 13748.45 79.60 282.16 3,269.65 2,393.60 N 11,653.44 W 11618.18 1.64 13841.85 79.37 281.91 3,286.69 2,412.75 N 11,743.26 W 11708.00 0.36 13935.30 78.78 281.67 3,304.41 2,431.50 N 11,833.08 W 11797.67 0.68 14028.72 78.98 281.81 3,322.42 2,450.15 N 11,922.82 W 11887.24 0.26 14122.07 79.09 280.97 3,340.18 2,468.25 N 12,012.66 W 11976.66 0.89 14215.42 79.26 280.59 3,357.71 2,485.40 N 12,102.73 W 12065.91 0.44 14308.83 78.81 279.31 3,375.48 2,501.24 N 12,193.06 W 12154.86 1.43 14402.15 78.78 279.17 3,393.61 2,515.94 N 12,283.41 W 12243.37 0.15 14495.50 79.61 279.02 3,411.11 2,530.43 N 12,373.95 W 12331.96 0.90 14588.81 78.58 280.63 3,428.77 2,546.07 N 12,464.23 W 12420.78 2.02 14682.16 79.04 283.19 3,446.89 2,564.96 N 12,553.83 W 12510.31 2.73 14775.53 79.38 285.65 3,464.37 2,587.80 N 12,642.65 W 12600.73 2.61 14868.94 80.02 287.82 3,481.07 2,614.27 N 12,730.65 W 12691.89 2.39 14962.32 81.80 290.55 3,495.83 2,644.57 N 12,817.73 W 12783.75 3.46 INSITE V8.3.0 Page 4Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 15055.66 83.51 293.40 3,507.76 2,679.21 N 12,903.56 W 12876.25 3.54 15149.02 83.92 296.11 3,517.98 2,718.07 N 12,987.82 W 12969.04 2.92 15242.35 84.51 298.98 3,527.39 2,761.00 N 13,070.14 W 13061.71 3.12 15335.67 84.73 301.77 3,536.14 2,807.98 N 13,150.29 W 13154.04 2.99 15429.06 84.73 303.31 3,544.72 2,858.00 N 13,228.68 W 13246.01 1.64 15522.38 85.44 306.24 3,552.72 2,911.02 N 13,305.04 W 13337.34 3.22 15615.69 86.32 309.14 3,559.43 2,967.92 N 13,378.68 W 13427.77 3.24 15709.08 86.65 311.62 3,565.15 3,028.30 N 13,449.69 W 13517.21 2.67 15802.21 87.79 312.74 3,569.67 3,090.76 N 13,518.61 W 13605.59 1.72 15895.61 87.12 313.78 3,573.82 3,154.70 N 13,586.56 W 13693.69 1.32 15989.06 86.94 312.86 3,578.66 3,218.73 N 13,654.46 W 13781.78 1.00 16082.31 87.47 314.13 3,583.21 3,282.84 N 13,722.03 W 13869.59 1.47 16175.65 86.26 314.29 3,588.31 3,347.82 N 13,788.83 W 13957.07 1.31 16268.89 86.34 314.45 3,594.33 3,412.89 N 13,855.34 W 14044.31 0.19 16389.35 85.79 312.06 3,602.60 3,495.23 N 13,942.86 W 14157.78 2.03 16434.89 86.56 311.08 3,605.63 3,525.38 N 13,976.85 W 14201.10 2.73 16530.02 86.79 309.01 3,611.15 3,586.48 N 14,049.55 W 14292.38 2.19 16624.93 86.42 306.96 3,616.77 3,644.79 N 14,124.22 W 14384.32 2.19 16719.61 88.88 304.94 3,620.65 3,700.32 N 14,200.80 W 14476.87 3.36 16814.64 88.63 303.45 3,622.72 3,753.71 N 14,279.38 W 14570.39 1.59 16909.53 87.76 301.50 3,625.71 3,804.63 N 14,359.38 W 14664.20 2.25 17004.63 89.00 300.55 3,628.40 3,853.63 N 14,440.85 W 14758.55 1.64 17099.43 88.81 301.30 3,630.21 3,902.34 N 14,522.15 W 14852.64 0.82 17194.41 88.93 303.04 3,632.08 3,952.89 N 14,602.53 W 14946.64 1.84 17289.45 89.11 303.96 3,633.71 4,005.34 N 14,681.77 W 15040.38 0.99 17384.37 88.89 303.61 3,635.36 4,058.12 N 14,760.65 W 15133.91 0.44 17479.22 89.67 302.51 3,636.56 4,109.85 N 14,840.14 W 15227.57 1.42 17573.86 90.79 302.65 3,636.18 4,160.81 N 14,919.88 W 15321.16 1.19 17668.80 89.42 301.72 3,636.00 4,211.38 N 15,000.23 W 15415.13 1.74 17763.95 89.89 301.64 3,636.58 4,261.35 N 15,081.20 W 15509.44 0.50 17858.72 89.94 301.07 3,636.72 4,310.66 N 15,162.13 W 15603.43 0.60 17953.79 90.03 302.22 3,636.74 4,360.54 N 15,243.06 W 15697.66 1.21 18048.62 90.11 300.66 3,636.63 4,410.00 N 15,323.97 W 15791.70 1.65 18143.39 91.73 298.39 3,635.10 4,456.70 N 15,406.41 W 15886.01 2.94 18238.32 95.97 298.34 3,628.73 4,501.68 N 15,489.74 W 15980.43 4.47 18333.38 98.63 298.77 3,616.65 4,546.75 N 15,572.55 W 16074.42 2.83 18428.02 94.39 298.33 3,605.93 4,591.68 N 15,655.13 W 16168.14 4.50 18522.93 93.58 299.59 3,599.33 4,637.52 N 15,737.97 W 16262.46 1.58 18617.69 93.19 299.99 3,593.73 4,684.52 N 15,820.06 W 16356.58 0.59 18712.70 92.81 302.91 3,588.76 4,734.02 N 15,900.99 W 16450.66 3.10 18807.63 92.97 307.58 3,583.97 4,788.71 N 15,978.40 W 16543.63 4.92 18902.67 91.76 310.54 3,580.05 4,848.54 N 16,052.13 W 16635.33 3.36 18997.45 92.66 309.02 3,576.39 4,909.14 N 16,124.91 W 16726.48 1.86 19092.30 92.50 310.36 3,572.12 4,969.65 N 16,197.82 W 16817.71 1.42 19187.14 92.56 308.36 3,567.94 5,029.74 N 16,271.07 W 16909.08 2.11 INSITE V8.3.0 Page 5Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 19281.83 90.67 303.86 3,565.27 5,085.50 N 16,347.52 W 17001.61 5.15 19376.92 90.69 304.66 3,564.14 5,139.03 N 16,426.10 W 17095.18 0.84 19472.04 90.07 306.64 3,563.51 5,194.46 N 16,503.39 W 17188.35 2.18 19566.73 89.63 305.68 3,563.76 5,250.33 N 16,579.84 W 17280.92 1.12 19661.56 88.98 305.41 3,564.91 5,305.46 N 16,656.99 W 17373.83 0.74 19756.53 89.33 306.45 3,566.31 5,361.18 N 16,733.89 W 17466.75 1.16 19851.61 89.83 308.32 3,567.00 5,418.90 N 16,809.43 W 17559.25 2.04 19946.35 89.96 310.52 3,567.18 5,479.06 N 16,882.61 W 17650.59 2.33 20041.20 90.15 309.64 3,567.09 5,540.13 N 16,955.18 W 17741.74 0.95 20136.02 90.89 308.85 3,566.23 5,600.11 N 17,028.61 W 17833.23 1.14 20230.86 90.63 309.48 3,564.97 5,660.00 N 17,102.14 W 17924.78 0.72 20326.12 89.45 309.89 3,564.90 5,720.83 N 17,175.45 W 18016.50 1.31 20419.46 88.12 309.58 3,566.88 5,780.48 N 17,247.21 W 18106.33 1.46 20512.81 87.46 309.15 3,570.48 5,839.65 N 17,319.32 W 18196.29 0.84 20606.17 90.15 308.43 3,572.43 5,898.11 N 17,392.07 W 18286.54 2.98 20699.49 87.08 309.67 3,574.68 5,956.88 N 17,464.51 W 18376.63 3.55 20792.62 88.80 310.89 3,578.03 6,017.05 N 17,535.51 W 18465.98 2.26 20885.96 89.16 312.62 3,579.69 6,079.19 N 17,605.13 W 18554.87 1.89 20979.21 90.03 312.17 3,580.35 6,142.07 N 17,673.99 W 18643.37 1.05 21072.51 90.26 313.22 3,580.12 6,205.33 N 17,742.56 W 18731.76 1.15 21165.88 90.04 313.63 3,579.87 6,269.51 N 17,810.38 W 18819.83 0.50 21259.28 90.43 313.96 3,579.49 6,334.15 N 17,877.79 W 18907.73 0.55 21352.67 90.41 315.09 3,578.80 6,399.64 N 17,944.37 W 18995.21 1.21 21445.99 90.72 314.93 3,577.88 6,465.63 N 18,010.34 W 19082.33 0.37 21539.32 91.91 315.56 3,575.74 6,531.89 N 18,076.04 W 19169.31 1.44 21632.68 92.00 315.29 3,572.56 6,598.35 N 18,141.52 W 19256.19 0.30 21725.99 90.45 313.04 3,570.56 6,663.34 N 18,208.44 W 19343.77 2.93 21819.37 90.40 315.47 3,569.87 6,728.50 N 18,275.31 W 19431.38 2.60 21912.62 90.10 315.58 3,569.46 6,795.04 N 18,340.64 W 19518.14 0.34 22006.01 89.89 315.79 3,569.47 6,861.86 N 18,405.88 W 19604.94 0.32 22099.27 90.77 315.90 3,568.93 6,928.77 N 18,470.85 W 19691.52 0.95 22192.52 91.11 316.31 3,567.40 6,995.96 N 18,535.49 W 19777.93 0.57 22285.86 89.94 316.18 3,566.55 7,063.37 N 18,600.04 W 19864.33 1.26 22379.24 87.95 314.99 3,568.27 7,130.06 N 18,665.38 W 19951.16 2.48 22472.64 88.70 315.07 3,571.00 7,196.11 N 18,731.36 W 20038.32 0.81 22566.09 90.09 313.48 3,571.98 7,261.34 N 18,798.26 W 20125.99 2.26 22659.51 90.77 313.52 3,571.28 7,325.64 N 18,866.02 W 20214.06 0.73 22752.86 88.04 313.29 3,572.25 7,389.78 N 18,933.83 W 20302.11 2.93 22846.21 87.39 312.67 3,575.97 7,453.37 N 19,002.07 W 20390.33 0.96 22939.62 86.77 311.73 3,580.73 7,516.03 N 19,071.18 W 20478.97 1.20 23032.94 89.33 312.64 3,583.91 7,578.66 N 19,140.28 W 20567.58 2.91 23131.23 89.83 312.63 3,584.63 7,645.23 N 19,212.59 W 20660.73 0.51 23200.00 89.83 312.63 3,584.83 7,691.80 N 19,263.19 W 20725.91 0.00 INSITE V8.3.0 Page 6Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 294.03 degrees (True) - A total correction of 18.82 deg from Magnetic north to True north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 23,200.00 feet is 20,742.09 feet along 291.77 degrees (True) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.3.0 Page 7Job No:AK-XX-0902750623 Well Name:SP28-NW3 L1 Survey Report