Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout193-202XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: scanned by: Bevedy ~Vincent TO RE-SCAN Nathan Lowell Date:'9-~-' Isl ~ Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si From: Sarber, Greg J [SarberJG@BP.com] Sent: Monday, February 02, 2009 8:22 AM To: Maunder, Thomas E (DOA) Subject: RE: E-34 (~ P&A Approval ~'y~~f l Tom, -----~j ~~1 ~ --c~~ ~- ~~' L~ ' ( e~ l Thank you for your assistance on getting verbal approval to abandon the slotted li"!er on E-fie 1 over the weeke,Ed should it have praven necessa~~y. ~~~het. the rig nE~cved over the ~~~k°~li trey d;d exgeria;~ hig:~ losses c~` brine t~ the ~ `':`inn t'Pr~„( ~~'?~ slotted 16nc-'r !'~`,w"`lt~i. l!~ ° r. b",/'Evan tb-~i~r ~e,~tn~`~`~"` ~~,°C'~ t~„i' i~1';'t~? ~l"f.' 17~ "',~~ I z ~>.~ekerid ~~~[~~ ,~".~t C ~vh.~'s~ock nu ~'~. .~.. a' tr '~, ,y yr ±4 a t ~ :'".~ 3i1 d -a r.~t.~, 1 U ~.r, i.,3G ! ci ii ~ s~ ~.n~U ~td'7 il~ rcV ~:~~JSe~~I'Y~tLi. ~ ,„ plan to purn~ cement to PEA the parent ~,v~:l~ at ~t~ ~ ~; af?d will ctrii; the ~~,~eli as ctc~c~~~~ r ~. In tha . permit to drill. Thanks again for yo~.~r help. Sinoerely. ~rec: barber From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, January 30, 2009 4:14 PM To: Sarber, Greg J Subject: FW: E-34 (1 4) P&A Approval Grey, We have completed our review and Commissioner Foerster has given her oral approval should the plugging be necessary. Let me know on Monday was occurs aver the weekend on this well. Also, as discussed; if the P&A is necessary the new "leg" will be an "A" rather than an L1. No additional permitting is needed. We will handle the name and API # changes next week if necessary. Tom Maunder, PE __.... AOGCC From: Sarber, Greg J [mailto:SarberJG@BP.com] Sent: Thursday, January 29, 2009 10:16 AM To: Maunder, Thomas E (DOA) fi ~ .r, Cc: Williamson, Mary J (DOA) ~ ~ `'~ v r.:.'` -~ t~~ `~' `~` ~ ~ ~"~`"~ Subject: RE: E-34 P&A Approval Tom. To answer your question, there is very little value in the parent E-34 well. The wail reached marginal GOR in April of 1997 and has been a cycle welt since then. It has a current on-time of 15°Iff. The slotted liner completion in the parent well severely limits any possibility of remedial work. The parent well currently has expected reserves of only 30 MBO. The proposed sidetrack has risked expected incremental blank oil reserves of 521 MBO. The risked incremental separator lilquid production expeced from this sidetrack is 946 M13O. I have also attached an amended summary fior the sundry application that has the requested information. This summary will be used by Terrie Nubble at BP to prepare the application for sundry should it be needed next week. Please let me know if you need any additional information. Sincererly; Greg Sarber From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, January 29, 2009 9:42 AM To: Sarber, Greg J Cc: Williamson, Mary J (DOA) Subject: RE: E-34 P&A Approval 2/2/2009 E-34 P&A Approval Page 2 of • ~ ~ Greg; i have spoken with Commissioner Foerster and a little more information is needed. If it is necessary to abandon the present interval we need some discussion as to the reserves (if any) that would be lost. Such information is narmally included if a completion interval is to be abandoned. Please "reply all" with the response. Call or message with any questions. Tom Maunder, PE AOGCC From: Sarber, Greg J [mailto:SarberJG@BP.com] Sent: Thursday, January 29, 2009 9:12 AM ~,~="1 (~~ To: Maunder, Thomas E (DOA) ~~~ d" Subject: E-34 P&A Approval Dear Mr. Maunder, I have a question for you about drilling operations on well E-34L1. This is a planned CTD sidetrack that the rig will be moving to tommorrow evening (11-30-2009). The parent well is a horizontal Sag river slotted liner producer, and the sidetrack plan will drill an Ivishak Zone 4 well. The sidetrack well has been permitted (PTD# 208178), but no sundry has been issued to abandon the existing parent wellbore. This was reviewed with you via email by Ron Phillips, on November 12, 2008. Ron was the engineer that did the origional sidetrack planning. The sidetrack plan is for the parent well perforations to be isolated behind the proposed CTD sidetrack liner, but are not planned to be abandoned by cement (See Schematic Attached). The plan does not include any production from the parent well Sag River slotted liner, but parent well production could potentially be restored at some future point by a cut and pull of the CTD liner. For that reason the new sidetrack lateral was named E-34L1 instead of E-34A, and no sundry to abandon the perforations was applied for. My question for you is about possible contingencies that could arrise this weekend. We intend to follow the plan for drilling that was covered by the permit to drill issued 11-21-2008. However, we may run into a couple of difficulties that may require us to pump cement on the parent well slotted liner. These situations are; 1 -The whipstock will be set in slotted liner. If the first whipstock fails to anchor properly in the slots, it may get pushed downhole by the window milling BHA. Window depths are critical on this well. Should the first whipstock slip downhole, the rig would need to set a second one. At that point cement would need to be pumped to lock the whipstock in place. Due to wellbore geometry, we would need to bring the cement up to 9,400' in the parent well. This would still leave open slotted liner from 9,400'-9,360'. So in theory there would still be access to the parent well production interval. Realistically, we would probably end up cementing all the slots up. A sundry would be required in this case. 2 -The parent well perforations are so prolific that we can't keep the hole full of mud. On the pre rig preperation work, a service coiled tubing unit was able to inject KCL brine into the slotted liner at 4.5 bpm with only 100 psi wellhead pressure. This indicates very good infectivity. With mud in the hole we may still have high losses which would make the well too difficult to drill. At this point the only alternative would be to P&A the parent well slotted liner prior to drilling the sidetrack. We will not know if either of these scenarios will occur until we begin operations on the well, which will happen on Friday. Should one of these situations occur over the weekend, may I have preliminary approval from the AOGCC to pump cement and abandon the parent well slotted liner on this well should it be necessary. In either case I will contact the AOGCC on Monday and also file the Sundry request on Monday should this be needed. Thank you for your consideration. Sincerely, Greg Sarber Ph: (907) 564-4330 Cell: (907) 242-8000 Email: sarberjg@bp.com 2/2/2009 TREE= CIW SAFETY NOTES: HORIZONTAL WB_L E 34 ' ACTUATOR = BAKER KB. ELEV = 67;70" BE ELEV = 30.20' ' --' KOP = 4287' Datum'l'VD = 8800' SS GAS LIFT MANDRELS .-- i ~-~ M----~ ~ DEV TYPE VLV LATCH PORT DATE Minimum ID 2.635" 9077' L] 3 4247 4174i 10 CAM MMG 3-1/2" SWN NO GO NIPPLE 2 7021 6793, 19 CAM MIVIG BK 1 8280 7984 18 CAM MMG BK ~ X--t ,oao' ! ~I~M PKR, D = 3.874" I I--~l ,077' 1--13-1/2'SWNNO~ON~.~D=2.63S"I I I I I I I DATE REV BY COMMENTS DATE ~ BY ODMMENI'S PRUDHOE BAY LlXlIT 01/26/94 ML ORIGINAL HORIZ COMPLETION WELL: E-34 02/14/01 SlS-QAA CONVERTED TO CANVAS PBRMIT No: 93-2020 03/08/01 SIS-MD FINAL APl No: 50~)29-22437-00 09/06/01 RN/TP CORRECTIONS i Sec. 6, T11 N, R14E i BP Exploration (Alaska) DATE REV BY COMMENTS DATE REV BY COMMENTS 01/26/94 ML ORIGINAL HORIZ COMPLETION 02/14/01 SIS-QAA CONVERTED TO CANVAS 03/08/01 SIS-MD FINAL 09/06/01 RN/TP CORRECTIONS ANNULAR INJECTION DATA ENTRY SCREEN Asset ~.QA .......................................... Rig Name N.~tb.Qr.$..~.~.F,, ............................. Inj Well Name F~:.~..~ ............................................ Sur Csg Dap :~.6.t~.~. ................ Legal Desc .L6.1~:.~I~JI,,..5.O.0.'.~EI~.~.e.~..§,..T.t.I~,.B.1..4E ........................................ Research ....................................................................................................................... ~.Q~.r.e.~t~.d..~.c~py..~.~.oLt~. AQ.G.g.g..?,,:26:.9.Z ........................... permit Start ........ .~/.?,,~.Lg.~ ........ permit find ....... 1.?,Z;~.l/.~.5. ....... ......... .1/1/.~..4 ................. .12J.3.1l.~..4 ....... Formation I ntermittant FlUids Freeze Cumulative Data ,~lt Rig Completion Final Well Total Mud/Ctg Wash FluidS Freeze ......... ~.~.~ .................. .z,~. ................... ~.,.4~.o. .................... .o.~.~. ..................................................... .,.o....: ................... .u.~ ........... Daily Data ............................................................-~Q-~-~fi~. ~ .... F--r-r-r-r-r-r-r-r-ri~--l Saurce Date of Conlarrinated RigWash ~ Farralim Freeze Daiy Well Injection D~Mud ~ Fluids Fluids ~ Protedion / Tobl 1::-34 ~01/20/04 150 1 O0 250 E-34 01/23/94 120 1 O0 220 E-38 08/23/95 40 40 BROKE @1850 PSI W/HOT OIL E-38 08/24/95 631 i631 E-38 08/25/95 220 220 E-38 08/28/95 220 220 E-38 E-38 E-38 08/29/95 08/30/95 08/31/95 300 120 34O E-38 09/01/95 105 E-38 09/02/95 937 E-38 09/03/95 645 80 3O0 120 34O 105 937 725 E-38 09/07/95 110 110 E-38 09/09/95 50 50 E-38 09/10/95 50 50 E-38 09/11/95 50 228 278 i~':~§ ....................................... ~'~"~' ................................................................................................................................................... 50 630 : ........................................................................................................................................................................................................................................ 110 790 600 PSI 65O PSI 700 PSI 65O PSI 7OO PSI 70O PSI 7OO PSI 75O PSI 75O PSI 75O PSI ........................................ ~'~"'J~i ................................................................................................... ................................................ 'i~'Sib'"'i~'§i ................................................................. ; .............................................. ............................................. '~'~'6"ff§'J* ................................................................................................... ~i~"'P§i ............................................................................................................... .................................................. '~'~'iS"i~'§i .................................................................................................................. ................................................. P'~'~'~'~"'~:iS¥'~'~i~'~q ................................................ _ . hare. d , , erwces l rilling Alaska amdr 900 East Benson BOulevard, MB 8-1 - Anchorage, Alaska 99508 . (907) 561-5111 Fax: (907) 564-5193 December 14, 1998 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request DEC 14 1998 Dear Ms. Mahan: Alaska 0il & Gas Cons. Commission Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular Disposal Records from July 25, 1995 through present time. We compared your list with our records and are able to provide you with the following data: · Individual Annular DiSposal Logs from the SSD database which coincide with the approved wells on your attached AOGCC Annular Log. The SSD records are provided to you in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as folloWs: · Endicott wells 1-037P-16, 1-65/3t-25, 1-59/0-24 · Exploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 &/t2, K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K-21i, F-66, K-06, K-54, K-33, F-49i, K-18 · PBU Wells E-38, 18-34, 15-42, S-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated from these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarifY this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a Sundry ' Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and June 6, 1996 were automatically approved for annular disposal with the Permit to Drill. We also provide you with a cumulative report from our database of records from July 25, 1995 through the present. From those records, we show the following wells not listed on your report were used for annular disposal: ,.Annular Disposal Letter 12/14/98 · Endicott wells 1-23/O-15, 1-61/Q-20, 2-40/S-22 · EXploration well Sourdouch #3 - ~oo ~4 ,~ - · Mime l~oointwellsF-06, H-05, H-06, J-13, L-24 - *t~- ,! · PBUwells-18-30, 18-31, 14:44,,~-4_3, E,-34, E-36, G-04A, andS-33-~'l°z- :~- o5 ~- D3- 20 ' q ~. 0'7 · Individual logs are provided to ~ou for these ~'ogs gs we~l. Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records. If I can be of any further assiStance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT CC: Dave Wallace - HSE Manager (w/out attachments) RECEIVED AJask~ Oil & Gas Cons. Anchom~e ;har(~d Se'r-~ice Dl'illing ,nnrlTar Injection Volumes uly 25, 199,5 until December 1998 :umulative Report surface casing '" ' g ' InjWell . . Depth LegaIDesc tdicott Cum Total Cum Mud & Ctgs ~yon 15 1-19/I-18 5000 Sec. 36, T12N, R16E 8,960 7,848 ~yon 15 1-23/O-15 4246 2020'FNL, 2087'FEW, SEC.36,T12N,R16E 32,084 30,604 ?...o?..!.5_ ............... ?_3..3.~.M...-.2_ .3- ........... .5.0..1_3. ............ 3__2_.!..7..' N__S_ .L_, _2!. ?.~..W E__ _L,_s..e_ C _3.6_,.T_1__.2.N_,' _Fl_ 1_6_ _E_ ........ _9,__8_7..9_ .... 9,729 .yon 15 1-61/Q-20 4236 3075'NSL, 2207'WEL, Sec 13,T12N, R16E 25,228 Cum Rig Cum Compl Cum Form Cumlnlerm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Start . End . Status. . , 992 120 12/5/95 12/5/96 Open 1,160 200 120 9/30/95 12/31/95 Open 150 8/31/95 12/31/95 Broached 21,379 2,613 1,176. 60 12/5/95 12/5/96 Open ~,,.....!..~ ......................... .DS......!..~:!s' ....................... ~3.0..~ ............................... .4....7..ff.....N.~L.:.,...s...1..~.~L.W...E...L..~....~?.~.,....T..!!.U, ........................................... .1.,?.~ ................................ ?..7. ...................................... ?..4. ........................................................................................................................................................................................ .sj .................. ..4/4!.9.~ ................................ ~./.d./.? ....................... ~.~o_~..h....e..d.. i/on 14 DS 15-48 3548 Sec. 22, T11N, R14E 3,385 216 820 2,283 66 12/21/95 12/21/96 Open ton 14 DS 15-49 3667 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 1,141 1,904 65 2/21/96 2/21/97 Open /on 9 18-30 3930 1499'SNL, 26'WEL, Sec 24,T11N, R14E 2,266 936 380 800 150 7/25/95 12/31/95 Open !,,o..,n....9. .................................... !.~:.3....1 ....................................... ..3..6..8,,0. ................................. .~?~.~.~..N.s~..L.~..~.~.~.~.[..~..~.s~...~.4..~..T.!.~.1~.N~....~.!..4~.~ ....................................... .s....,.,0..~) ................................ 2?..?.?.. ............................. !..'.?, ............................. ~.'?.~ .................................................................................................................. !...7...1 ................ ,7,!2~,.(9-,5. ........................ !.~..3.!../,r9,~ ...................... ,O.p.?.. ................ Con 9 18-32 3830 3632'NSL 41'WEL, Sec 24,T11N, R14E 3 311 1,861 200 1,100 150 8/24/95 12/31/95 Open ~on 9 18-33 4140 3690'NSL 56'WEL Sec 24,T11N, R14E 5,215 2,050 3,035 10 120 9/28/95 12/31/95 Open ~ors 18E 12-35 3543 348'NSL, 705'WEL, Sec 18,T10N, R14E 3,723 3,436 137 150 9/1/95 12/31/95 Open ?..r..s...?...8..E_ .................... !..4...'..4..~. ................................... 3.2...8....8. ............................... 2....8.2_..9_'..N...S...L..,... 1..?...7..'..W.. E...L..,.._ .S...e.c_..9_:~i~..!..~.~ ........................... .3...,.9..7.4. .............................. .2.,.~.17. ................................... !.:..5....3...5. ............................... 120 8/17/95 12/31/95. Open 4oration 14 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, T9N, R24E 5,786 4,630 1,156 1/26/96 1/26/97 Closed le E MPK-17 3508 3648'NSL,2100'WEL, Sec.03,T12NR11E 19,608 18,538 285 685 100 4/18/96 4/18/97 Open .o?.....27.~ ..................... .M...p...C..-?. _3 .......................... .4..9..4.! ........................... !. _0..3.8 ?.S_..L_L 2_4..0_4._..W_ .E..Lj.~..s...?...C...!..o. ,_T I_3_N.L .............................. _2.,_0_6_0" ........................ _1..,_87_0- ............................ !.30 ......................................................... 130 1/25/96 1/25/97 Open ars 22E MPC-25 8595 1143'FNL, 2436'FWL, Sec 10,T13N, R10E 1,905 ~,465 300 140 1/5/96 1/5/97 Open 3rs 22E MPC-26 4704 1086 NSL, 2419 WEL, Sec 10,T13N, 5,228 4,483 555 190 12/19/95 12/19/96 Open :)rs 22E MPC-28 5405 Sec 10,T13N, R10E 425 350 75 2/15/96 2/15/97 Open Page 1 .DEC 1 4 1998 Sha,,r~.~d oervice DHIling Ann~l"ar InjeCtion Volumes July 25, 199~ until December 1998 Cumulative Report {ig Inj Well Jabors 22E MPF-06 labors 22E MPF-14 .... labors 22E MPF-70 , labors 22E MPH-05' Sudace Casing Depth 8766 6690 7919 5335 Cum Mud Cum Rig CumCompl Cum Form Cum Interm . Cum Final Disposal Period Annulus Legal Desc Cum Total & Ctgs Wash Fluids Fluids Freeze ...... Freeze start End. status Sec,.06~T13N, R10E 1,927 1,731, 196 1/25/96 1/25/97 Open Sec'O6,T13N, R10E UM 18,717 17,107 1,270 340' 6/3/96 6/3/97 O.p.~n ......... 2189'NSL, 2591'WEL, Sec 6,T13N, R10E 19,775 18,794 735 . 190 56 6/17/96 6/17/97 Open 2882'NSL, 4028'WEL, Sec 34,T13N, R10E 8,283 7,711 . 382 190 8/19/95 12/31/95 Open labors22E M~H-06 7304 . 2824'NSL, 4044'WEL, Sec34,T13N, R10E 8,515 . 8,335 180 8/5/95 12/31/95 Open 'abors 22E MPI-07 2680 2339'NSL, 3906'WEL, Sec 33,T13N, R10E 1,680 1,280 250 80 ' 70 9/21/95 12/31/95 Open abors 22E MPJ-13 2835 2319'NSL, 3179'WEL, Sec 28,T13N, R10E 14,127 13,292 645 60 130 10/17/95 12/31/95 Open abors 22E MPJ-16 3112 2317'NSL 3336'WEL Sec 28 T13N R10E 985 915 ' 70 11/12/95 '12/31/95 Open abors 27E B-24 4080 Sec 18,T13N, R11E UM 1,468 1,396 72 . 1/25/96 1/25/97 Open abors 27E MPF-22 8841 Sec 06 T13N R10E UM 6 536 6 466 70 12/12/95 '12/12/96 Open abors 27E MPF-25 3405 1857'NSL 2696'WEL Sec 6 T13N R10E ' 9 897 9 357 250 225 65 12/26/95 12/26/96 Open abors 27E MPF-37 6621 1931'NSL 2643'WEL Sec 6 T13N R10E 7 032 6 887 .70 75 7/25/95 12/31/95 Open abors 27E MPF-38 8561 1994'NSL 2731'WEL Sec 6 T13N R10E 9 232 9 157 ' 75 12/6/95 12/31/95 Open ~bors 27E MPF-45 6678 1979'NSL, 2608'WEL, Sec 6,T13N, R10E 17,562 17,381 181 7/31/95 12/31/95 ' Open ~bors 27E MPF~53 6750 2028'NSL 2572'WEL Sec 6 T13N R10E 6 051 5 671 165 75 60 80 8/19/95 12/31/95 Open ~bors 27E MPF-61 6585 2077'NSL, 526'WEL~ Sec 31,T14N. R10E 5,732 5,657 75 8/31/95 12/31/95 Open !.b.,o.~...,.2.,77. ....................... ,M...P...~:~.2' ........................... ~..0.~?. .............................. 2,.?..4...I_'.~_S_L..~.6.2..7.~,.W_E__L.,,._S,e..~..~:..T,,1...3.~.~_R_.1_.0.~ ................................ .3_.8.~_ ...................................... ?,.!.~ ............................... 70 10/13/95 12/31/95 Open !?,?,?.7,.E. ....................... ,M.,.P.,.~:.-.,~ ............................... .5,,.7...7? ................................. 2?.~5~;.~s~.L~.~.~..~2"~5~.~?-~E~.~L~...`~s~`~.~T~.!.~N~?E' .................................... ~...~.~,.0,. .................................. .9.,,..?. ............... : .......................................................... i .............................................................................................................. i .................................................. .7..~ ............... ~.3.?5 ........................ !,2~?..9..?. ................... .o.,._p.,e_n ............... Ibors 27E MPF-78 7085 2237'NSL, 2555'WEL, Sec 6,T13N, R10E 8,476 7,456 40 775 65 140 9/12/95 12/31/95 Open ~bors 27E MPL-24 6515 3654'NSL 5180'WEL Sec 8 T13N R10E 6 790 4 900 1 320 ' 165 335 70 11/27/95 12/31/95 Open OA E F-33 3570 3332'NsL, 2174'WEL, Sec 2,T11N R13E 1 468 183 660 465 160 2/21/96 2/21/97 Open E F-36 3691 2642'NSL, 2878'WEL, Sec 2,T11N, R13E 6,963 1,998 1,359 3,471 135 12/18/95 12/18/96 Open ,yon 9 D-30 3456' 3625' NSL, 1066' WEL, SEC. 23, T11N, 5,261 2,811 1,275 1,035 140 1/31/96 1/31/97 Open ,yon 9 D-31 3215 SEC. 26, T11N, R13E 150 ' 150 4/20/96 4/10/97 Open .yon 9 D-33 3222 2965' NSL, 1067' WEL, SEC. 23, T11N, 4,661 2,425 2,106 130 2/21/96 2/21/97 Open bors 18E S-43 3121' 4211'NSL,4503'WEL,SEC35,T12N,R12E 5,943 2,636 1,716 1,511 80 5/7/97 5/'7/98 OPEN Page 2 Shared Sei~ice Dr,.illing Ann'~l~'r iniection Volumes July 25, 1995. until December 1998 Cumulative Report Sudace Casing :{ig Inj Well Depth qabors 28E B-33 3504' qabors 28E E-34 3664 ~labors 28E E-36 3648 ,. Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Legal Desc .. CU.m To~a! & Ctgs Wash Flui~ls. Fluids Freeze Freeze Start End Stalus 969'SNL, 1898'EWL, Sec 31, T11N, R14E 3,974 2,842 857' 195 80 5/1/96 12/31/96 Broached 168'SN1:-, 5(~O,WEL~..Se~ 6,..T1!.N, R14E~ 9.,~.5..6 ............... 7,.2.:~8 . !.'420 ................... .8...5.1~ 4.0 ......................... !!.0 .8/23/95 ........ !.2/3!!95 ........Open . 1706'SNL, 822'WEL, Sec 6,T11N, R14E 9,271 4,417 1,293 3,096 365 100 7/25/95 12/31/95 Open 3391'NSL, 881'WEL, Sec 6,T11N, R14E 4,695 374 80 9/16/95 12/31/95 Open ~labors 28E E-37 3810 4,241 ~labors 28E E-39 3638 3358'NSL, 501'WEL, Sec 6,T11N, R14E 2,250 928 220 1,022 80 8/28/95 12/31/95 Open 4abors 28E G-04A 3509 2917'NSL, 1974'WEL, Sec 12,T11N, R13E 5,937 1,798 1,824 2,315 ' 10/20/95 12/31/95 Open ~abors 28E G-21 3509 2911'NSL 2368'WEL Sec 12 T11N R14E 11 430 3 956 3 072 4 270 ' 70 '62 9/8/95 12/31/95 Open ~abors 28E S-24 2750 1633'SNL 4228'WEL Sec 35 T12N R12E 20,261 11,773 2,177 5,751 275 285 12/9/95 12/9/96 Open labors 28E S-33 2958 1639'SNL, 1487'WEL, Sec 35,T12N, R 12E 18,014 6,613 2,431 8,392 270 308 12/1/95 12/1/96 Open Jabors 28E S-41 3331 4152' NSL 4504' WEL Sec 35 T12N 8 062 4 159 2,034 1,754 115 2/8/96 2/8/97 Open :.....; .................................................. '. .......................................... '. .............................. .'. ................. ! ....................................................... .'. ...................................................................................................................................................................................................................................................................................................................................................................................................................................... labors 28E S-42 3077 Sec 35, T12N, R12E 168 100 68 3/13/96 3/13/97 Open labors 2ES H-35 3157 4535'NSL 1266'WEL Sec 21 T11N R13E 4 860 3 725 555 480 ' 20 80 10/26/95 12/31/95 Open labors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,T11N, R13E 1,452 857 100 410 85 10/26/95 12/31/95 Open Page 3 ri-.llin g' TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily suspend this well as per AOGCC 20- AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid 'wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call me if I may be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 AOGCC !nd±viduat Well Geeiog±cal Haterials Invente~'y P age · ! Date' 10/13/95 PF..'R~iT n~T;, T DATA PLUS RUN DAT E_RE CVD 9 '3 - 202 93-~,02 93-202 6006 ~~6763~10678 MWD 40'7 '~'~COMP DATE' 01/27/94 DAILY WELL OP ~~/05/94~-01/27/94 SURVEY .~-I0742, MWD 93-202 DGR/DGWD ~z/80-10742, MWD,MD 1~-9 93'-'~ / - ~02 DGR/DGWD 80-8727, MWD TVD t B' PLS (STAT/TEHP) .~8100-9213 5..'3 -202 1 02/17/94 03/08/94 03/08/94 03/08/94 01/28/94 01/28/94 04/12/94 yes ~d. receiv~;'?,=~.. Are: ~z= fiiuc:: samples required? Was the well cored? yes ~~'Jalysis & description received? ___ceived? ,. Are well tests required?[~fes. Well 2~s in comp_,~an~e initial ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 17 March 1994 RE: Transmittal of Data ECC #: 6140.00 Data: PL Dear Sir/Madam, Reference: BP E-34 NORTH SLOPE, AK Enclosed, please find the.data as. described below: Prints/Films: 1 1 Sent by U.S. MAIL PLS STATIC FINAL BL Run # 1 Run # 1 Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION coMMISSION WELL COMPLETION OR RI:COMP LI=TION REPORT .AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SLISPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 93-202 3. Address 0R I ~r~!j~]Al 8. APINumber P. O. Box 196612, Anchorage, Alaska 99519-6612 $0- 029-22437 4. Location of well at surface ~ ' ~., 9. Unit or Lease Name 168' SNL, 500' WEL, SEC. 6, T11N, R14E ~' C:~'~r ~ ?.. Prudhoe Bay Unit At Top Producing Interval ///.~..~,~..,,~2/ 1i 10. Well Number · ~ .v~,_l E-34 (34-32-12-14) , ~ c~-r : 11 Field and Pool At Total Depth ,. .~",.~.,,.~, .[.!., ' Prudhoe Bay Field/Prudhoe Bay Pool 795' NSL, 2878' EWL, SEC. 32, T12N, R14E ..... -::'~ ~ '?.L !.~I''' 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No. KBE = 64.95' ] ADL 28299 12. Date Spudded1/5/94 13. Date T.D. Reached1/23/94 14' Date C°mp" Susp' °r Aband' 115' Waler Depth' if °ffsh°re 116' N°' °l C°mpleti°ns1/27/94 N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD 19. Directional Survey ]20. Depth where SSSV set 121. Thickness of Permafrost 10742' MD/8727' 7'VD 10742' MD/8727' TVD YES [] t,~ []! 2104'feet MD I 1900'(Approx.) I 22. Type Electric or Other Logs Run GR/MWD ., 23. CASING, LINER AND CEMENTING RECORD SE'FRNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'I-I'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5~ H-40 31' 111' 30" 260 sx Arctic'set (Approx.) 10-3/4" 45.5~ NT8OLHE 35' 3664' 13-1/2" 1040 sx PF "E"/375 sx "G' 7-5/8" 29. 7# N T95HS 33' 9360' 9- 7/8" 505 sx Class "G' 4-1/2" 12. 6~ L-80 9146' 10742' 6-3/4" Uncemented 24. Per/orations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET (MD/ None- Slotted Liner 9214'-10718' 3-1/2", L-80 9090' 9030' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL. (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 2/7/94 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I'F_.ST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL IGAS-MCF WATER-BBL DIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence o! oil, gas or water. Submit core chips. Anch0~age Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include inlerval tested, pressure data, all fluids recovered and gravity, MEAS. DEP'fl-i TRUE VERT. DEPTH GOR, and time of each phase. Subsea Sag River 9343' 8660' Shublik 10224' 8690' Top Sadlerochit Not pene~ated ECE!VED 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed · -.?, Title Drilling EngineerSugervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: E-34 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 01/05/94 02:00 SPUD: 01/05/94 09:00 RELEASE: OPERATION: DRLG RIG: DOYON 9 WO/C RIG: DOYON 9 01/05/94 ( 1) TD: 0'( 0) RIG OVER HOLE MW: 0.0 VIS: 0 0~/06/94 ( 2) TD: 1459' (1459) 01/07/94 ( 3) TD: 2918' (1459) 01/08/94 ( 4) T2: 3680' ( 762) 01/09/94 ( 5) TD: 4120' ( 440) 01/10/94 ( 6) TD: 5597' (1477) DRILLING MW: 8.9 VIS:235 P/U BHA AND ORIENT DY. DRL. TEST MWD AND FUNCTION TEST DIVERTER SYSTEM. SPUD AT 0900 HORS. AND DRILL TO 144' CHANGE KNIFE VALVE ON DIVERTER LINE AND DRILL W/ BIT # 1 T/1459' DRILLING MW: 9.5 VIS:250 DRILLING TO 1873'. CIRCUALATE. SHORT TRIP, WASH AND REAM UP 1226' TRIP BACK TO BOTTONM. OK. DRILLING TO 2315' BUILT AND CHANGE OUT 300 BBLS. OF MUD. CIRCULATE AND CONDITION MUD. SHORT TRIP WASH AND REAM OUT 1829' WASH AT 1226' PULL OK TO 830' REAM 40' TO BOTTOM. DRILL TO 2918'. CASG MW: 9.9 VIS:235 DRILLING TO 3680', CASG PT. CIRC. SHORT TRIP TO 2303', OK. CIRC AND CONDITION THE MUD FOR CASG. AND DROP SURVEY. POOH AND L/D BHA. R/U AND RUN 10.75" CASG. AND LAND SAME. CIRC FOR 1 HR. AND CEMT AS ABOVE. RIG DOWN CASING TOOLS AND LAY DDWN LANDING JOINT. DRILLING MW: 9.0 VIS: 44 WASH AND L/D M20" HYDRIL. 180 SX. PERMAFROST TTOP, JOB CMT. TO SURF. N/U BOPE. TESTG BOPE PER BPX WITNESS DOUG AMOS. (D.O.G.) . INSTALL WEAR RING P/U BHA AND ORIENT MWD TOOLS. RIH TEST KELLY AND 5K TEST CASG AT 2800 PSI FOR 30 MIN. OK. DRILLING FIRM CMT AND FLOAT EQUIPMENT PLUS 5' NEW HOLE. PERFORM L.O.T. AS ABOVE. DRILLING W/ BIT # 2. DRILLING MW: 9.7 VIS: 41 DRILLING TO 4633' CIRCULATE. SHORT TRIP TO SHOE FOR SWABBING. DRILLING TO 5587' CIRCULATE. SHORT TRIP TO 4335'. SWABBING F/5352 T/4781' CONTINUE DRILLING W/BIT #2. WELL : E-34 OPERATION: RIG : DOYON 9 PAGE: 2 01/11/94 ( 7) TD: 6464' ( 867) 01/12/94 ( 8) TD: 7105' ( 641) 01/13/94 ( 9) TD: 7880' ( 775) 01/14/94 (10) TD: 8457' ( 577) 01/15/94 (11) TD: 9048' ( 591) 0!/16/94 (12) TD: 9242' ( 194) DRILLING MW: 9.9 VIS: 39 DRILLING W/BIT # 2 TO 5723' CIRCULATE AND DROP SURVEY. POOH AND SWAB F/4560' T/440~' . BHA SERVICED. MWD. SERVICE WEAR RING. RIH, REAM F/5650 T/5723' . CONTINUE DRILLING W/ BIT #3 T/6464' DRILLING MW:10.0 VIS: 41 DRILLING F/6464 T/6814. CIRCULATE BOTTOMS UP. POOH FOR BIT CHANGE. NEW HOLE SECTION HAS A FEW TIGHT SPOTS. CHANGE BHA AND PU SPERRY GR TOOL AND THE SMITH PDC BIT. RIH W/ BHA %4. SMOOTH TRIP. DRILL F/6814 T/7105. FAST ROTATION, SLOW SLIDE. DRILLING MW:10.2 VIS: 45 DRILL F/7105 T/7687. CBU TO 10 STAND SHORT TRIP. HOLE SLICK - NO PROBLEMS. DRILLING F/7687 T/7880. SLIDING TO MAINTAIN ANGLE. DRILLING MW:10.3 VIS: 47 DRIL F/7880 T/8320. REACH 2ND KOP, TRIP FOR A NEW BHA. CBU AND DROP SURVEY. POOH SOME SWABBING NEEDED F/6596 T/5930' LD 2 STABS AND MOTOR. P/U AND ORIENT 1-1/2 DEGREE MOTOR. TIH TO 3650' CUT AND SLIP 54' DRLG LINE. TIH TO 8260' TAKING WT AT 8260'. WASH F/8255' T/8287' MADE PASS F/8~95' T/ 8320' DRILLING AND SLIDING FROM 8~20' TO 8457' DRILLING MW:10.5 VIS: 44 DRILIING F/8457 T/8808. CBU FOR SHORT TRIP F/8807 T/7812'. TIGHT AAT 8223 & 8127. RIH AND HIT BRIDGE AT 8446. PU KELLY AND WORK THRU. LD KELLY. RIH TO BTM - NO PROBLEMS. DRILLING F/8807 T/9048' DRILLING MW:10.6 VIS: 50 DRILLING F/9048 T/9125. PUMP LO/HI VISC SWEEPS AROUND. POOH (STICKY AT 7370). TEST BOPE STACKK AND CHOKE MANIFOLD TO 250/LOW AND 5000 HIGH. CHANGE OUT MWD PULSOR. ORIENT MOTOR AND P/U NEW BIT. RIH TO 9082. FILL PIPE AT 3600' AND 6798' TIGHT AT 8811' P/U KELLY AT 9082' HOLE PACKING OFF. STAGE UP CIRC RATE AND WORK PIPE UNTIL HOLE IS SMOOTH. DRILL F/9125 T/9242. AOGCC REP - MR. FOSTER WITNESSED THE BOP TEST ON 1/15/94 WELL : E-34 OPEP~TION: RIG : DOYON 9 PAGE: 3 01/17/94 (13) TD: 9370' ( 128) 01/18/94 (14) TD: 9370' ( 0) 01/19/94 (15) TD: 9615' ( 245) 01/20/94 (16) TD: 9910' ( 295) 01/21/94 (17) TD:10366' ( 456) 01/22/94 (18) TD:10530' ( 164) 01/23/94 (19) TD:10742' ( 212) RUNNING 7-5/8" CASN MW:10.6 VIS: 44 DRILLING F/9242 T/9370. DRILLED 20' MD INTO SAG RIVER. CIRC HOLE CLEAN AND PUMP SLUG. SHORTTRIP TO 7900. TIGHT ON TRIP OUT AT 9018 AND 8860. WIPE OUT TIGHT SPOTS AT 8900 TO 9050 ON TRIP IN. CIRC AND COND. MUD TO RUN CASG. PUMP LO/HI VIS SWEEPS. POOH W/NO PROBLEMS. HOLE APPEARS SLICK. LD BHA AND HWDP. PULL WEAR BUSHING. CHANGE AND TEST RAMS. OK. RU TO RUN CASG START RUNNING 7-5/8 CASG 29.7 PPF NT95HS NSCC CASG. BROKE CIRC AT SHOE. HAVE RUN 160 JTS AT REPORT TIME. PU 3.5" DP MW:10.4 VIS: 38 FINISH RUNNING 7-5/8" CASING. HAD TIGHT SPOT F9000 T/9120. CASING WENT TO BOTTOM - LANDED AT 9360' CIRCULATE WELL CLEAN - FULL RETURNS. MIX AND PUMP CEMENT AS PLANNED. FULL RETURNS THROUGHOUT JOB. PLUG BUMPED W/2000 PSI CIP AT 1330. LD LANDING JOINT AND CMT HEAD. SET PACKOFF AND TEST TO 5000PSI FOR 15 MINUTES. LAY DOWN 5" DP. CHANGE TOP AND BOTTOM RAMS TO 3.5" KELLY. TEST KELLY AND 3.5" FLOOR VALVES. TEST 3.5" RAMS IN STACK, INSTALL BOWL PROTECTOR. PU SLIMHOLE BHA. ORIENT MOTOR. TIH W/BHA. PU 3.5" DP FROM PIPE SHED. DRILLING MW: 9.1 VIS: 51 TEST MWD CONTINUE TO PU 3.5" DP. CUT AND SLIP 54' DL. CONTINUE TO PU 3.5" DP. KELLY UP AT 9210' BREAK CIRC. TAG 7-5/8" FLOAT COLLAR AT 9236' CIRC 10 MIN. TEST CASG TO 3500 PSI FOR 30 MIN. OK. DRILL OUT FLOAT EQUIPMENT AND 10' NEW HOLE. DISPLACE WELL TO XANVIS/FLO - PRO SYSTEM. INJECT OLD SYSTEM DOWN SURFACE ANNULUS. DRILL F/9380 T/9615. DRILLING MW: 9.1 VIS: 45 DRILLING WITH BIT # 7 TO 9782. CBU. POOH TIGHT AT 9590, 9559 AND 9463. BHA DOWN LOAD MWD. RIH, REAM F/9728 T/9782. DRILLING W/BIT #8. DRILLING MW: 9.3 VIS: 60 DRILLING TO 10301. SHORT TRIP TO 9750' TO CHECK HOLE. OK. DRILLING TO 10366' WITH BIT # 8. RIH AND REAM MW: 9.4 VIS: 59 DRILLING TO 10530' CBU FOR SAMPLES. POOH -- HOLE OK. CHANGE BHA AND TEST MWD. RIH AND REAM TIGHT SPOT IN CASING TEN FEET FROM SHOE. RIH TO TIGHT SPOT AT 9800'. L/D 22JTS OF DP. RIH W/7STNDS DP. REAM F/9800' POOH MW: 9.4 VIS: 62 REAM TO 10530. DRILLING WITH BIT NO. 9 TO 10742' - TD. CIRC AND CONDITION HOLE. POOH F/ HOLE OPENER. WELL : E-34 OPERATION: RIG : DOYON 9 PAGE: 4 01/24/94 (20) TD'10742' ( 0) 01/25/94 (21) TD'!0742 P~.' 0 POOH MW: 9.5 VIS: 61 POOH - BHA, L/D MWD TOOLSS. RIH W/SEC. BULL NOSE HOLE OPENER. REAM OPEN HOLE F/9360 T/10742. CIRCULATE, SHORT TRIP TO SHOE. NO PROBLEMS. CUT 7 SLIP 54' OF DRILLING LINE. RIH, CIRCULATE HI/LO VIS. SWEEP. POOH F/SLOTTED LINER (SLM AND DROP 1-7/8" RABBIT). DISPLACE W/ SEA WATER MW: 8.8 Seawater POOH (SLM NO CORR.) L/D BHA. SERVICE THE WEAR RING AND R/U TO RUN LINER. RUN 4.5" SLOTTED LINER AND 2-1/16" INNER WASH STRING WITH 7-5/8" TIW HOR. PACKER. RIH W/SLOTTED LINER ON 3.5" DP. CIRC. AT 7-5/8" SHOE. RIH W/LINER TO BOTTOM AT 10742. NO PROBLEMS. CIRCULATE, DROP BALL AND SET PACKER W/3500PSI AND SHEAR PACKER AT 3500PSI. TEST BACK SIDE TO 3000PSI. OK. REL. PACKER AND DISPLACE WITH FILTERED SEAWATER AS PER PROGRAM. 01/26/94 (22) TD:10742 PB- 0 0!/27/94 (23) T7~.i0742 P~' 0 SIGNATURE: RUNNING TUBING MW: 8.8 NaCl/Br DISPLACE W/FILTERED SEAWATER. L/D DP AND TIW RUNNING TOOLS. L/D 2-1/16" WORK STRING. PULL BOWL PROT. AND R/U TO RUN TUBING. RUN 3-1/2" TUBBING AND SSSV. PREPARE FOR PAD/PAD MOVE MW: 0.0 NaC1/Br CONTINUE TO RUN 3.5" TUBING, MAKE UP HANGER AND CONTROL LINE, TEST SAME, LAND TUBING, R I L D S. REVERSE CIRC. 310BBLS. TREATED BRINE. SET PACKER AND TEST AT 4000 PSI. TEST ANNULUS AT 3500PSI. SHEAR RP VALVE, L/D LANDING JOINT. ATTEMPTED TWICE TO INSTALL THE 2-WAY CHECK - COULDN'T GET ENOUGH TURNS TO SEAT PROPERLY. SET THE BP VALVE. CHANGED TOP RAMS F/3.5" T/4.5". N/D BOP'S. N/U ADAPTER FLANGE AND TREE, TEST SAME, USE LUBRICATOR TO PULL BP VALVE. INSTALL 2-WAY CHECK TEST. DISPLACE 90 BBLS. DIESEL TO FREEZE PROTECT WELL. U-TUBE DIESEL AND INSTALL BP VALVE, SECURE TREE, INJECT WASTE FLUID. PREPARE RIG FOR PAD TO PAD MOVE. RIG RELEASED FROM E-34 AT 02:00 HOURS ON 1/27/94. (drilling Superintendent) DATE: r.~ /! ,! SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 0 .00 -67.70 200 200.57 132.87 289 289.97 222.27 379 379.41 311.71 465 465.94 398.24 DATE OF SURVEY: 012394 MWD SURVEY JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 0 N .00 E .00 .00N .00E 0 33 S 70.26 W .27 .33S .91W 0 31 S 47.04 W .24 .75S 1.61W 0 28 S 48.39 W .06 1.28S 2.20W 1 2 S 64.25 W .69 1.86S 3.17W .0O -.96 -1.76 -2.46 -3.56 554 553.98 486.28 646 646.29 578.59 734 734.20 666.50 823 823.50 755.80 913 913.61 845.91 0 26 S 28.14 E 1.30 2.51S 3.73W 0 56 N 59.57 E 1.14 2.44S 2.91W 1 51 N 67.24 E 1.05 1.52S .98W 1 42 N'56.88 E .40 .24S 1.46E 1 57 N 79.92 E .85 .76N 4.09E -4.28 -3.47 -1.36 1.33 4.14 1003 1003.02 935.32 1098 1097.68 1029.98 1189 1189.36 1121.66 1284 1283.92 1216.22 1379 1378.38 1310.68 2 7 N 60.64 E .78 1.83N 7.03E 3 19 N 49.33 E 1.38 4.48N 10.64E 4 11 N 66.10 E 1.52 7.58N 15.73E 3 53 N 66.42 E .33 10.27N 21.85E 4 18 N 67.03 E .44 12.94N 28.06E 7.26 11.46 17.21 23.83 30.54 1477 1476.05 1408.35 1571 1569.74 1502.04 1661 1659.83 1592.13 1760 1758.88 1691.18 1853 1852.17 1784.47 3 18 N 60.95 E 1.09 15.75N 33.91E 3 2 N 63.75 E .32 18.17N 38.52E 2 15 N 79.65 E 1.20 19.55N 42.41E 1 22 N 89.95 E .93 19.90N 45.52E 1 7 N 84.40 E .31 19.99N 47.55E 36.93 42.03 46.15 49.23 51.21 1950 1949.43 1881.73 2045 2044.04 1976.34 2139 2137.93 2070.23 2235 2233.52 2165.82 2330 2328.93 2261.23 1 4 N 88.03 E .09 20.11N 49.41E 1 8 N 83.52 E .12 20.25N 51.23E 1 12 N 70.82 E .28 20.68N 53.08E 0 48 S 51.51 E 1.08 20.58N 54.56E 0 38 S 41.25 E .22 19.76N 55.44E 53.03 54.81 56.72 58.11 58.73 2426 2424.40 2356.70 2521 2519.55 2451.85 2616 2615.17 _2547.47 2711 2710.01 2642.31 2806 2805.07 2737.37 0 51 S 53.18 E .28 18.93N 56.36E 0 46 S 49.54 E .10 18.08N 57.43E 0 52 S 51.33 E .11 17.20N 58.49E 0 56 S 43.68 E .14 16.19N 59.60E 1 1 S 46.86 E .11 15.04N 60.76E 59.39 60.18 60.97 61.75 62.56 2896 2895.22 2827.52 2995 2993.75 2926.05 3089 3088.03 3020.33 3183 3182.12 3114.42 3279 3277.91 3210.21 1 0 S 42.20 E .10 13.90N 61.88E 0 46 S 43.05 E .23 12.78N 62.91E 0 58 S 41.08 E .22 ll.71N 63.87E 0 50 S 26.64 E .28 10.49N 64.71E 0 47 S 39.72 E .20 9.35N 65.45E 63.32 64.01 64.64 65.11 65.51 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES 3375 3373.57 3305.87 3468 3467.22 3399.52 3566 3564.46 3496.76 3628 3626.81 3559.11 3717 3715.31 3647.61 DG/ 0 54 S 29.69 E 0 53 S 33.20 E 2 7 N 79.04 E 2 3 44 N 72.72 E 2 3 36 N 72.36 E DATE OF SURVEY: 012394 MWD SURVEY JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 OPERATOR: BP EXPLORATION DLS TOTAL RECTANGULAR COORDINATES 100 NORTH/SOUTH EAST/WEST FT. VERT. SECT. .20 8.18N 66.25E 65.95 .06 6.93N 67.01E 66.35 .02 6.64N 69.19E 68.36 .64 7.46N 72.27E 71.55 .15 9.17N 77.69E 77.23 3812 3809.98 3742.28 3906 3904.35 3836.65 4002 3999.38 3931.68 4098 4094.89 4027.19 4191 4187.17 4119.47 3 31 N 71.75 E .10 5 4 N 66.92 E 1.68 5 41 N 63.76 E .72 7 49 N 59.55 E 2.27 8 13 N 59.45 E .43 10.98N 83.31E 13.53N 89.91E 17.28N 98.04E 22.70N 107.96E 29.30N 119.16E 83.13 90.18 99.02 110.04 122.63 4287 4281.39 4213.69 4383 4375.77 4308.07 4477 4467.97 4400.27 4571 4559.77 4492.07 4666 4652.43 4584.73 10 36 N 62.11 E 2.54 11 21 N 63.26 E .81 11 32 N 56.41 E 1.46 11 31 N 56.19 E .05 13 32 N 58.24 E 2.17 36.89N 132.81E 45.29N 149.09E 54.66N 165.20E 65.06N 180.79E 76.19N 198.12E 137.84 155.79 173.86 191.70 211.42 4762 4745.73 4678.03 4857 4837.61 4769.91 4953 4930.18 4862.48 5048 5020.10 4952.40 5144 5111.68 5043.98 14 15 N 58.15 E .74 16 21 N 59.02 E 2.22 16 33 N 57.33 E .54 18 8 N 55.96 E 1.74 19 29 N 54.35 E 1.49 88.35N 217.74E 101.44N 239.20E 115.86N 262.42E 131.32N 285.89E 149.17N 311.49E 233.62 257.84 284.13 310.93 340.45 5240 5201.95 5134.25 5336 5292.66 5224.96 5431 5381.47 5313.77 5526 5469.61 5401.91 5621 5558.45 5490.75 19 21 N 55.43 E .40 19 5 N 55.12 E .29 21 2 N 52.78 E 2.24 21 52 N 52.98 E .88 22 28 N 53.63 E .67 167.47N 337.52E 185.49N 363.51E 204.60N 389.72E 225.52N 417.36E 247.15N 446.39E 370.50 400.44 430.88 463.19 497.05 5718 5647.37 5579.67 5812 5734.40 5666.70 5908 5821.23 _5753.53 6002 5906.98 5839.28 6097 5993.63 5925.93 22 23 N 53.11 E .22 24 11 N 56.85 E 2.46 24 36 N 62.09 E 2.31 24 31 N 64.25 E .96 23 40 N 64.65 E .91 269.05N 475.85E 290.50N 506.54E 310.47N 540.44E 328.17N 575.42E 344.89N 610.39E 531.38 566.77 604.85 643.34 681.56 6192 6081.12 6013.42 6287 6169.58 6101.88 6382 6259.06 6191.36 6478 6349.41 6281.71 6573 6438.57 6370.87 21 46 N 67.09 E 2.24 20 8 N 67.00 E 1.71 20 0 N 67.37 E .21 19 55 N 67.16 E .10 19 48 N 66.40 E .30 359.90N 643.82E 373.11N 675.02E 385.79N 705.16E 398.48N 735.43E 411.18N 765.04E 717.81 751.44 783.91 816.50 848.46 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 6668 6528.46 6460.76 6751 6606.66 6538.96 6859 6708.43 6640.73 6954 6797.43 6729.73 7049 6886.78 6819.08 COURS COURSE INCLN DIRECTION DG MN DEGREES DG/ DATE OF SURVEY: 012394 MWD SURVEY JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 OPERATOR: BP EXPLORATION DLS TOTAL RECTANGULAR COORDINATES 100 NORTH/SOUTH EAST/WEST FT. 19 44 N 66.88 E .18 19 36 N 67.11 E .19 19 30 N 68.14 E .33 19 24 N 67.46 E .26 19 32 N 68.93 E .54 VERT. SECT. 423.99N 794.71E 880.50 434.92N 820.44E 908.24 448.68N 853.87E 944.16 460.56N 882.98E 975.41 472.30N 912.33E 1006.85 7145 6977.50 6909.80 7240 7067.17 6999.47 7334 7156.00 7088.30 7431 7247.68 7179.98 7525 7336.10 7268.40 19 21 N 68.09 E .35 19 6 N 67.00 E .47 19 20 N 66.90 E .26 19 50 N 67.39 E .54 19 31 N 66.99 E .36 484.04N 942.14E 1038.74 495.98N 971.05E 1069.82 508.11N 999.55E 1100.55 520.78N 1029.61E 1132.93 533.04N 1058.77E 1164.34 7619 7424.93 7357.23 7714 7514.93 7447.23 7808 7604.29 7536.59 7903 7694.42 7626.72 7998 7784.45 7716.75 19 20 N 65.46 E .58 18 27 N 63.82 E 1.08 17 46 N 64.54 E .77 18 46 N 65.64 E 1.12 18 10 N 64.79 E .69 545.67N 1087.45E 1195.38 558.86N 1115.30E 1225.78 571.60N 1141.61E 1254.57 584.12N 1168.61E 1283.97 596.73N 1195.93E 1313.70 8094 7875.43 7807.73 8190 7966.48 7898.78 8252 8025.60 7957.90 8348 8116.40 8048.70 8442 8203.68 8135.98 17 56 N 63.57- E .47 18 8 N 62.64 E .37 17 53 N 62.98 E .42 19 13 N 69.48 E 2.56 25 22 N 81.11 E 8.00 609.65N 1222.63E 1342.92 623.07N 1249.08E 1372.03 631.86N 1266.18E 1390.89 644.07N 1294.06E 1421.05 652.65N 1328.62E 1456.64 8539 8289.76 8222.06 8634 8372.22 8304.52 8666 8398.80 8331.10 8698 8424.29 8356.59 8730 8448.81 8381.11 28 30 N 84.19 E 3.56 32 23 N 86.60 E 4.25 35 7 N 86.94 E 8.56 38 19 N 86.90 E 10.06 41 24 N 84.50 E 10.81 658.18N 1372.00E 1499.87 662.01N 1420.31E 1547.38 663.01N 1438.05E 1564.71 664.03N 1457.04E 1583.26 665.58N 1477.44E 1603.31 8762 8472.33 8404.63 8794 8494.74 8427.04 8826 8515.74 _8448.04 8857 8535.06 8467.36 8889 8553.12 8485.42 43 31 N 81.98 E 8.50 46 57 N 81.63 E 10.81 50 43 N-80.91 E 11.97 54 18 N 81.06 E 11.27 55 4 N 80.70 E 2.64 668.13N 1498.82E 1624.56 671.35N 1521.18E 1646.94 675.00N 1544.92E 1670.77 678.95N 1569.81E 1695.80 682.99N 1594.99E 1721.12 8920 8571.17 8503.47 8952 8589.15 8521.45 8984 8606.55 8538.85 9015 8622.33 8554.63 9048 8637.32 8569.62 55 1 N 80.76 E .23 55 31 N 83.25 E 6.67 58 26 N 83.27 E 9.11 61 55 N 83.46 E 11.01 62 57 N 83.11 E 3.32 687.15N 1620.48E 1746.77 690.76N 1646.18E 1772.47 693.90N 1672.77E 1798.91 697.08N 1700.11E 1826.08 700.44N 1728.65E 1854.44 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 9079 8650.97 8583.27 9112 8663.93 8596.23 9144 8676.06 8608.36 9176 8687.29 8619.59 9208 8696.52 8628.82 65 21 67 42 68 12 71 23 74 9 DATE OF SURVEY: 012394 MWD SURVEY JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. N 81.27 E 9.31 704.27N 1756.56E N 80.13 E 7.90 709.10N 1786.02E N 80.37 E 1.69 714.18N 1815.57E N 81.10 E 10.00 719.09N 1845.69E N 79.95 E 9.57 723.99N 1875.04E 1882.34 1911.99 1941.80 1972.11 2001.68 9239 8704.97 8637.27 9270 8712.55 8644.85 9300 8718.78 8651.08 9323 8723.48 8655.78 9343 8727.54 8659.84 74 41 77 20 78 4 78 15 78 11 N 81.19 E 4.16 728.96N 1904.96E N 81.09 E 8.42 733.65N 1935.03E N 81.25 E 2.55 738.03N 1963.29E N 81.23 E .83 741.45N 1985.45E N 81.80 E 2.82 744.33N 2004.74E 2031.82 2062.02 2090.40 2112.65 2131.99 9374 8734.01 8666.31 9407 8740.54 8672.84 9438 8745.93 8678.23 9471 8749.75 8682.05 9502 8752.02 8684.32 78 14 78 35 81 27 85 10 86 37 N 81.80 E .12 748.75N 2035.44E N 82.29 E 1.83 753.16N 2067.00E N 82.01 E 9.27 757.35N 2097.35E N 82.15 E 11.34 761.84N 2129.65E N 82.31 E 4.56 766.12N 2161.03E 2162.72 2194.28 2224.62 2256.91 2288.27 9532 8753.29 8685.59 9564 8753.91 8686.21 9597 8753.93 8686.23 9629 8753.09 8685.39 9661 8751.58 8683.88 88 24 89 23 90 33 92 23 93 1 N 81.64 E 6.55 770.19N 2189.90E N 82.13 E 3.37 774.77N 2222.03E N 81.81 E 3.69 779.32N 2254.28E N 82.76 E 6.38 783.68N 2286.43E N 82.14 E 2.79 787.87N 2318.09E 2317.14 2349.30 2381.56 2413.68 2445.27 9694 8749.80 8682.10 9713 8748.80 8681.10 9723 8748.27 8680.57 9755 8746.71 8679.01 9787 8745.38 8677.68 93 15 92 49 92 49 92 52 91 52 N 81.82 E 1.20 792.39N 2350.15E N 82.41 E 3.83 795.00N 2369.01E N 82.06 E 3.28 796.44N 2379.56E N 82.07 E .19 800.76N 2410.56E N 81.04 E 4.47 805.50N 2442.44E 2477.35 2496.19 2506.73 2537.73 2569.69 9818 8744.35 8676.65 9849 8743.78 8676.08 9882 8743.70 -8676.00 9914 8744.02 8676.32 9946 8744.82 8677.12 91 52 90 14 90 3 88 46 88 24 N 80.23 E 2.56 810.63N 2473.57E N 79.07 E 6.55 816.12N 2503.61E N 79.41 E 1.18 822.19N 2535.58E N 79.27 E 4.01 828.13N 2567.12E N 80.38 E 3.59 833.88N 2599.19E 2601.03 2631.43 2663.84 2695.80 2728.21 9978 8746.22 8678.52 10010 8748.18 8680.48 10040 8750.02 8682.32 10072 8751.92 8684.22 10105 8753.73 8686.03 86 35 86 24 86 33 86 39 86 57 N 80.89 E 5.91 839.09N 2630.73E N 80.08 E 2.58 844.38N 2662.33E N 80.20 E .64 849.52N 2691.90E N 80.66 E 1.46 854.85N 2723.47E N 79.93 E 2.43 860.31N 2755.44E 2759.97 2791.81 2821.66 2853.49 2885.72 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE . COMPUTATION DATE: 1/25/9 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 10137 8755.33 8687.63 10169 8756.66 8688.96 10201 8757.77 8690.07 10232 8758.05 8690.35 10259 8757.67 8689.96 COURS INCLN DG MN DATE OF SURVEY: 012394 MWD SURVEY JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 87 21 N 80.09 E 1.33 865.91N 2787.19E 87 47 N 79.77 E 1.70 871.40N 2818.12E 88 13 N 80.77 E 3.41 876.79N 2849.57E 90 46 N 81.60 E 8.44 881.66N 2880.97E 90 51 N 81.59 E .33 885.58N 2907.52E VERT. SECT. 2917.79 2949.04 2980.76 3012.30 3038.90 10295 8757.18 8689.48 10328 8757.51 8689.81 10360 8758.88 8691.18 10390 8760.26 8692.56 10421 8761.21 8693.51 90 40 N 81.81 E .80 890.81N 2943.37E 88 11 N 81.81 E 7.60 895.46N 2975.64E 86 50 N 82.05 E 4.32 899.91N 3007.03E 87 58 N 82.14 E 3.71 904.10N 3037.24E 88 31 N 82.36 E 1.94 908.29N 3068.03E 3074.81 3107.13 3138.53 3168.73 3199.49 10455 8762.32 8694.62 10489 8763.54 8695.84 10523 8764.79 8697.09 10553 8765.16 8697.46 10587 8763.45 8695.75 87 40 N 82.78 E 2.88 912.59N 3100.97E 88 13 N 82.70 E 1.63 916.89N 3134.73E 87 34 N 82°60 E 1.89 921.27N 3168.69E 91 2 N 80.50 E 13.43 925.70N 3198.48E 94 45 N 80.00 E 11.12 931.40N 3231.69E 3232.35 3266.00 3299.85 3329.72 3363.21 10618 8760.09 8692.39 10650 8754.75 8687.05 10682 8747.04 8679.34 10691 8744.48 8676.78 10742 8727.15 8659.45 97 26 N 78.40 E 9.91 937.28N 3262.49E 101 53 N 77.80 E 14.08 943.74N 3293.17E 106 7 N 77.20 E 13.39 950.43N 3323.37E 107 10 N 77.10 E 11.81 952.34N 3331.71E 113 0 N 77.10 E 11.55 962.92N 3377.91E 3394.45 3425.72 3456.60 3465.14 3512.48 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3512.48 FEET AT NORTH 74 DEG. 5 MIN. EAST AT MD = 10742 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 74.09 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 INTERPOLATED VALUES FOR EVEN DATE OF SURVEY: 012394 JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 0 .00 -67.70 .00 N .00 E 1000 999.79 932.09 1.78 N 6.92 E 2000 1998.43 1930.73 20.14 N 50.32 E 3000 2998.30 2930.60 12.73 N 62.95 E 4000 3997.07 3929.37 17.18 N 97.83 E MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .21 .21 1.57 1.36 1.70 .13 2.93 1.23 5000 4974.28 4906.58 122.94 N 273.46 E 6000 5904.65 5836.95 327.71 N 574.46 E 7000 6840.58 6772.88 466.39 N 897.02 E 8000 7785.68 7717.98 596.91 N 1196.29 E 9000 8614.69 8546.99 695.49 N 1686.38 E 25.72 22.79 95.35 69.63 159.42 64.08 214.32 54.90 385.31 170.99 10000 8747.50 8679.80 842.52 N 2651.70 E 10742 8727.15 8659.45 962.92 N 3377.91 E 1252.50 867.19 2014.85 762.35 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 DATE OF SURVEY: 012394 JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 0 .00 -67.70 67 67.70 .00 167 167.70 100.00 267 267.70 200.00 367 367.70 300.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST .00 N .00 E .00 N .00 E · 22 S .61 W .61 S 1.46 W 1.22 S 2.12 W MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 .00 .00 .00 .01 .00 .01 .00 467 467.70 400.00 567 567.70 500.00 667 667.70 600.00 767 767.70 700.00 867 867.70 800.00 1.88 S 3.20 W .02 .01 2.60 S 3.68 W .03 .01 2.26 S 2.61 W .04 .01 1.10 S .01 E .08 .04 .43 N 2.59 E .13 .05 967 967.70 900.00 1067 1067.70 1000.00 1168 1167.70 1100.00 1268 1267.70 1200.00 1368 1367.70 1300.00 1468 1467.70 1400.00 1569 1567.70 1500.00 1669 1667.70 1600.00 1769 1767.70 1700.00 1869 1867.70 1800.00 1 3 6 9 12 15 18 19 19 20 .19 N 5.89 E .35 N 9.32 E .94 N 14.28 E .83 N 20.84 E .63 N 27.33 E .51 N 33.49 E .12 N 38.42 E .60 N 42.72 E .90 N 45.73 E .02 N 47.85 E · 19 .06 .27 .09 .47 .19 .72 .26 .97 .25 1.21 .24 1.36 .16 1.47 .11 1.52 .05 1.54 .02 1969 1967.70 1900.00 2069 2067.70 2000.00 2169 2167.70 2100.00 2269 2267.70 2200.00 2369 2367.70 2300.00 2469 2467.70 .2400.00 2569 2567.70 2500.00 2669 2667.70 2600.00 2769 2767.70 2700.00 2869 2867.70 2800.00 2969 2967.70 2900.00 3069 3067.70 3000.00 3169 3167.70 3100.00 3269 3267.70 3200.00 3369 3367.70 3300.00 20 20 20 20 19 18 17 16 15 14 · 12 N 49.75 E .30 N 51.69 E .88 N 53.67 E .28 N 54.93 E · 44 N 55.73 E .54 N 56.88 E .66 N 57.93 E .68 N 59.12 E .5O N 60.27 E .26 N 61.56 E 13.04 N 62.67 E 11.97 N 63.65 E 10.67 N 64.62 E 9.46 N 65.36 E 8.26 N 66.20 E 1.56 .02 1.58 .02 1.60 .02 1.61 .01 1.62 .01 1.63 .01 1.64 .01 1.65 .01 1.67 .01 1.68 .02 1.70 .01 1.71 .01 1.72 .01 1.73 .01 1.74 .01 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 INTERPOLATED VALUES FOR EVEN 100 DATE OF SURVEY: 012394 JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3469 3467.70 3400.00 3569 3567.70 3500.00 3669 3667.70 3600.00 3769 3767.70 3700.00 3870 3867.70 3800.00 6.92 N 67.02 E 6.66 N 69.31 E 8.26 N 74.82 E 10.17 N 80.83 E 12.26 N 86.92 E 1.75 .01 1.80 .04 1.97 .17 2.17 .20 2.38 .21 3970 3967.70 3900.00 4071 4067.70 4000.00 4172 4167.70 4100.00 4273 4267.70 4200.00 4375 4367.70 4300.00 15.88 N 95.21 E 20.81 N 104.74 E 27.87 N 116.74 E 35.69 N 130.55 E 44.56 N 147.64 E 2.79 .41 3.37 .59 4.34 .97 5.61 1.27 7.45 1.84 4477 4467.70 4400.00 4579 4567.70 4500.00 4681 4667.70 4600.00 4784 4767.70 4700.00 4888 4867.70 4800.00 54.63 N 165.16 E 65.96 N 182.13 E 78.12 N 201.25 E 91.30 N 222.48 E 105.99 N 246.76 E 9.48 2.03 11.54 2.06 14.09 2.55 17.16 3.08 21.13 3.96 4993 4967.70 4900.00 5098 5067.70 5000.00 5204 5167.70 5100.00 5310 5267.70 5200.00 5416 5367.70 5300.00 121.88 N 271.81 E 140.13 N 298.86 E 160.65 N 327.62 E 180.54 N 356.43 E 201.40 N 385.50 E 25.44 4.31 30.63 5.19 36.68 6.06 42.64 5.95 48.86 6.22 5523 5467.70 5400.00 5631 5567.70 5500.00 5740 5667.70 5600.00 5849 5767.70 5700.00 5959 5867.70 5800.00 225.05 N 416.75 E 249.42 N 449.47 E 274.08 N 482.55 E 298.68 N 519.06 E 320.37 N 559.27 E 56.27 7.41 64.27 8.01 72.45 8.18 81.73 9.28 91.68 9.95 6069 5967.70 .5900.00 6177 6067.70 6000.00 6285 6167.70 6100.00 6391 6267.70 6200.00 6497 6367.70 6300.00 340.02 N 600.12 E 357.81 N 638.88 E 372.84 N 674.38 E 387.00 N 708.06 E 401.05 N 741.54 E 101.47 9.79 110.20 8.73 117.39 7.19 123.85 6.46 130.24 6.39 6604 6467.70 6400.00 6710 6567.70 6500.00 6816 6667.70 6600.00 6922 6767.70 6700.00 7028 6867.70 6800.00 415.38 N 774.66 E 429.51 N 807.65 E 443.30 N 840.48 E 456.54 N 873.31 E 469.86 N 906.00 E 136.55 6.31 142.80 6.25 148.95 6.15 155.03 6.08 161.08 6.05 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-34 500292243700 NORTH SLOPE COMPUTATION DATE: 1/25/94 DATE OF SURVEY: 012394 JOB NUMBER: AK-MW-40005 KELLY BUSHING ELEV. = 67.70 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7134 6967.70 6900.00 482.75 N 938.95 E 167.15 6.07 7240 7067.70 7000.00 496.05 N 971.22 E 173.07 5.92 7346 7167.70 7100.00 509.72 N 1003.32 E 178.98 5.91 7452 7267.70 7200.00 523.55 N 1036.28 E 185.18 6.20 7559 7367.70 7300.00 537.42 N 1069.09 E 191.34 6.15 7665 7467.70 7400.00 551.91 N 1101.05 E 197.31 5.98 7770 7567.70 7500.00 566.55 N 1131.02 E 202.73 5.42 7875 7667.70 7600.00 580.38 N 1160.33 E 207.86 5.13 7981 7767.70 7700.00 594.39 N 1190.95 E 213.37 5.52 8086 7867.70 7800.00 608.54 N 1220.39 E 218.58 5.20 8191 7967.70 7900.00 623.25 N 1249.43 E 223.74 5.17 8296 8067.70 8000.00 638.03 N 1278.30 E 228.87 5.13 8403 8167.70 8100.00 649.62 N 1312.91 E 235.36 6.49 8514 8267.70 8200.00 656.91 N 1360.32 E 246.32 10.95 8629 8367.70 8300.00 661.83 N 1417.51 E 261.66 15.34 8755 8467.70 8400.00 667.57 N 1494.54 E 288.26 26.60 8914 8567.70 8500.00 686.35 N 1615.58 E 346.79 58.53 9122 8667.70 8600.00 710.68 N 1795.12 E 454.33 107.54 10742 8727.15 8659.45 962.92 N 3377.91 E 2014.85 1560.52 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS ANNULAR INJECTION DATA ENTRY SCREEN A s s e t .WE)& ......................................... Rig Name .~ab~r.s..2,SE ........................... Inj Well Name .E.*.RA..: ...................................... Permit Start ...... 6..-.2,6.:.9.5 ..... Sur Csg Dep .3,6.6.& .............. · .............................. Curnulative Data Legal D e s c ..1,6~'.S ~L,..5.0Q:~.EL,S.~c...6,..,T..1..1N.,...B,.1...4E ............................. Research ........................................................................................................................ Carmcted..copy...s~m..~..AQGC.C..2:26:,gZ ............... Permit E n d ....::t.£ J..3..1.J..9.5... Rig Completion Formation Intermittant Final Well Total Mud/Ctq : Wash: Fluids Fluids Freeze Freeze ISource I Date of /Well : i Injection E-34 .E..:..3_.,~ ............... I.E~:.3.~ ...................... 01/17/94 01/18/94 01/20/94 01/23/94 01/25/94 08/23/95 O8/24/95 08/25/95 08/26/95 08/27/95 08/28/95 08/29/95 08/30/95 08/31/95 09/01/95 __:_09/02/95 09/03/95 _~ 9/04/9~5_ 09/06/95 E-~8 09/07/95 6-38 '!~-~7~ 9/95 E-38 !09/10/95 E-38 i09/1 1/95 E-38 109/13/95 Daily Data Contaminated~ RigWash I Completion Formation I Freeze I Freeze Daily t DrlgMud / Fluids, Fuids Fluids I Protecti;n I P;;te;t°n I: Total: : Rate Pressure[[ '~'"'u'u~ / Status / Comments Complications 1994 Year End Summary 500 150 120 220 0 ~220 300 !120 34O 105 937 _5_o~_ i--- 5 o i i { 50 [228 ~ , t 278 i 5--0_._. 1630 I~ 10 .... 790 I , 645 _9o 1995 SUMMARY BROKE @1850 PSI W/HOT OIL 600 PSI 650 PSI i700 PSI PSI .~.00 PSI 700 PSI 700 PSI 750 PSI 75O PSI 750 PSI 800 PSI 800 PSI ]850 PSI 9O0 PSI 950 PSI 900 PSI FREEZE PROTECTION n !:! I I_1_1 I~ G S ~ I:t~JI C ~: S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - E-34 February 17, 1994 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Paul Radzinski, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG Format LIS Tape with Verification Listing. Received: t ECEIVED FEt~ 1 ? 199q Alaska Oil &~Gas COns. 'qncnorage C°rnrni~lort Date 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Baroid Company MEMORANDUM State of. aska Alaska Oil and Gas Conservation Commission TO: David Jo~ DATE: Chairmar¢' THRU: Blair Wondzell, ~[~/~. FILE NO: P. I. Supervisor FRO M: Bobby Fo s te r,~~-{- S U B JE C T: Petroleum Inspector January 15, 1994 AHFIAOBD.doc BOPE Test - Doyon 9 BPX- PBU - E - 34 PTD # 93- 202 DATE, 1993: I traveled to BPX's E - 34 and witnessed the BOPE test on rig 9. As the attached BOPE Test Report shows~there was one failure. The pressure sensor on the choke manifold would not operate properly. This is to be repaired and a AOGCC inspector notified. The rig was clean and orderly - ali tools hung up, floor clean and no tripping hazards. The related drilling tools were stacked in an orderly manner on the location and the loader was working clearing snow and since the wind has been blowing for a month, that is a full time job. Summary: I witnessed the BOPE test on Doyon 9 - test time 2 hours - 1 failure. . Attachment: AHFIAOBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Ddg: X Drlg Contractor: Operator: Well Name: Casing Size: 10 3/4 Test: Initial Workover: DOYON Rig No. g PTD # BPX Rep.: E- 34 Rig Rep.: Set @ 3,660 Location: Sec. Weekly X Other 93 -202 DATE: 1/15/94 Rig Ph.# 659- 4831 GOODRICH / HAZZARD TIM KRUPA 6 T. 11N R. 14E Meddian U MISC. INSPECTIONS: FLOOR SAFETY VALVES: Location Gen.: OK Well Sign OK Upper Kelly / IBOP Housekeeping: OK (Gen) DH. Rig OK Lower Kelly / IBOP Reserve Pit N/A Ball Type Inside BOP BOP STACK: Quan. Annular Preventer 1 Pipe Rams Lower Pipe Rams 1 Blind Rams Choke Ln. Valves . HCR Valves Kill Line Valves Check Valve Test Pressure 500~5000 PtF P P P 1 500~5000 P 500~5000 P 500~5000 ~ 500~5000 P ~ IVtA P MUD SYSTEM: Visual Alarm Trip Tank YES YES Pit Level Indicators YES YES Flow Indicator YES YES Gas Detectors YES YES Test Quan. Pressure P/F I 500~5000 P 1 500~5000 P 1 500t5000 P 1 500t5000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 15 Test Pressure P/F 500t5000 P 38 500~5000 P 1 P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Bti's: 5&2000 &O00 P 1,725 P minutes 35 sec. min~es 15 sec. YES Remote: YES Psig. Number of Failures: 1 '" ,Test Time: 2.0 Hours, Number of valves tested 2_~' Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 6,59-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: VALVE IN CHOKE MANIFOLD LEAKED- CYCLED VALVE AND RETESTED OK. THE PRESSURE SENSOR ON THE CHOKE MANIFOLD DID NOT OPERA TE PROPERLY WILL BE REPAIRED AND I WILL BE NOTIFIED. 1 Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c -Inspector STATE WITNESS REQUIRED? Waived By: YES NO X Witnessed By: 24 HOUR NOTICE GIVEN YES X NO FI-021L (Rev. 7/19) AH FIAOBD.XLS WELL LOG TRANSMITTAL T0: State of Alaska January 28, 1994 Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - E-34 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Paul Radzinski, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 _2" x 5~MD. Gamma Ray Logs: 1 Blueline 1 Folded Sepia 2"x 5" TVD Gamma Ray Logs: 1 Blueline -' 1 Folded Sepia Received: 5631 SilveradoWay, SuiteG · Anchorage, Alaska99518 ° (907)563-3256 · Fax(907)563-7252 A Baroid Company MEMORANDUI , State ,laska Alaska Oil and Gas Conservation Commission TO: David John.~on; DATE: Chairmaf~2~ January 5, 1993 THRU: FILE NO: Blair Wondzell,~..-o,,.~ P. I. Supervisor FROM: LOU Grimaldi, SUBJECT: Petroleum Inspector EHFJAEBD.doc Diverter Inspection Doyon rig//9 BPX well E-34 Prudhoe Bay Field PTD 1/93-202 DATE, 1993: I traveled to BPX E-Pad in the Prudhoe Bay Field to witness the Diverter function test on Doyon rig #9. When I arrived, the crew was just finishing nippling up the Diverter line, this line terminated within thirty feet of the rig and at my request another fody feet was added to it. As the pit was filled with snow from the recent blow and would require extensive snow removal to extend it any further, I allowed the rig to proceed with this length vent line. The annular preventer was a 21 1\4" Hydril type MSP with a single 14" vent line. When functioned, the diverter completed it's cycle in 24 seconds which is a good time for this size assembly. I made a tour of the rig and found it to be in good shape. The rig was passed to drill surface hole at this point. Summary: I witnessed the Diverter function test on Doyon rig #9.. Attachment:EH FJAEBD.XLS STATE OF ALASKA -~'~ ALASKA OIL Ami) GAS CONSERVATION COMMIS',.,,~.~N Diverter Systems Inspection Report Date: Operation: Development X Exploratory: Drlg Contractor: Doyon Rig No. 9 PTD # 93-202 Rig Ph. # Operator: BPX Oper. Rep.: Jerry Habethur Well Name: E-34 Rig Rep.: Ron Wilson Location: Sec. 6 T. 11-N R. 14-E Merdian Umiat 1/5/93 659-4836 MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: OK Systems Pressure: 1950 psig Housekeeping: OK (Gen.) Drlg. Rig: OK Pressure After Closure: 1700 psig Reserve Pit: N/A Flare Pit: OK 200 psi Attained After Closure: 0 min. 43 sec. Systems Pressure Attained: 2 min. 22 sec. DIVERTER SYSTEM INSPECTION: Nitrogen Bottles: Five Bottles Diverter Size: 21 1\4 in. 1900 Average psig Dived Valve(s) Full Opening: YES Valve(s) Auto & Simultaneous: YES MUD SYSTEM INSPECTION: Light Alarm Vent Line(s) Size: 14 in. Trip Tank: P P Vent Line(s) Length: 85' ft. Mud Pits: P P Line(s) Bifurcated: NO Flow Monitor: P P Line(s) Down Wind: YES Line(s) Anchored: YES GAS DETECTORS: Light Alarm Turns Targeted / Long Radius: N/A Methane P P Hydrogen Sulfide: P P Direction of flo ~-- 120' North Non Compliance Items ~ Ropair Itoms Within Day (s) ^nd contact tho Inspector @ 659-3607 Remarks: Wells #8&9 are shutin and plugged, well#7 safety system is in service. ;)istribution orig. - Well File c - Oper/Rep c- Database c - Trip R~_I~ (Rev. 7/93 c- Inspector AOGCC REP.: EHFJAEBD.XLS OPERATOR REP.: Louis R Grimaldi ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 December 29, 1993 Michael Zanghi Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit E-34 BP Exploration (Alaska), Inc. Permit No: 93-202 Sur. Loc. 168'SNL, 500'WEL, Sec. 6, TllN, R14E, UM Btmhole Loc. 4512'SNL, 2512'WEL, Sec. 32, T12N, R14E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman~ BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll"l,lb. Type of well. 'E'X'l~lO~i~r~ [-I Stratigraphic Testl-I Development Oil[ii Re-Entry [] DeepenI-11 Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 65.2' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pooi P. 0. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28299 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(~,e 20 AAC 25.025) 168' SNL, 500' WE/_, SEC. 6, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4646' SNI_, 3469' WEL, SEC. 32, T12N, R14E E-34 (34-32-12-14) 2S 100302630-277 At total depth 9. Approximate spud date Amount 4512' SNL, 2512' WEL, SEC. 32, T12N, R14E 1/6/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MO and TVD) property line ADL 28304-767' feet E-8-26'@ 1050'MD feet 2560 10640'MD/8797' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 2o AAC 25.035 (e)(2)) Kickoff depth 3401 feet Maximum hole angle s~' o Maximum surface 3330 psig At total depth (TVD) 8~00'/4390 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 31' 31' 111' 111' 260 sx Arcticset (Approx.) 13-1/2" 10-3/4" 45.5# NT8OLHE BTC 3666' 31" 31' 3697' 3695' 1040 SX PF/375 sx Class "G" 9-7/8" 7-5/8" 29. 7# NT95HS NSCC 9644' 31' 31' 9675' 8757' 1000 sx Class "G" 6-3/4" 4-1/2" 12.6# L-80 NSCC 1116' 9525' 8757' 10640' 8797' Uncemented slotted liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface RECEIVED Intermediate Production DEC 2. 2. '~995 Liner Perforation depth: measured A!~,~ U~I & Gas Cons. C0m$issiO.tl true vertical Anchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l'~l Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21.1 hereby certify., that the forf~going is true and correct to the best of my knowledge Signed~r(~.-~,,j~~ Title Drilling En~Tineer Supervisor Date ~?--Z f',-~",/ ~(,..., ~) Commission Use Only Permit Number APl number ]Approval date See cover letter 0 50-I ~'- ~"3 for other requirements Conditions of approval Samples required [] Yes [~No Mud Icg required []Yes ~'No Hydrogen sulfide measures [] Yes I~No Directional survey requ~re~ 1~ Yes [] No Required working pressure for BOPE'[3 2M; 1-13M; I-]5M; I'-I10M; [315 M; Other: Original Signed By by order of Approved by David W. John,~n Commissioner me commission Date/z/z-?/'?~ ~ i ;. ; ,i._:_ i:_ _.1. Form 10-401 Rev. 12-1-85 Submit in triplicatu [Well Name: IE-34 Well Plan Summary I Type of Well (producer or injeCtor): I Sag River Producer Surface Location' Target Location: Bottom Hole Location' 168'FNL, 500'FEL, SEC6, TllN, R14E, UM 4646'FNL, 3469'FEL, SEC 32, T12N, R14E, UM 4512'FNL, 2512'FEL, SEC 32, T12N, R14E, UM I AFENumber: 14P0531 I Estimated Start Date: I JAN 6, 1994 I I MD: I 10640" ! !TVD: Well Design (conventional, slimhole, etc.): Formation Markers: I Rig: I DOYON 9 ! Operaiing days to complete: 125 18797' ! [ KBE: I Slirnhole Horizontal 165.2' ,. Formation Tops MD TVD (BKB) Base of Permafrost 1951 1950 10 3/4" Casing 3697 3695 set at 10'tvd aboVe SV3 SV3 3706 3705 ,,Ugnu, 4A 4708 4695 Seabee top 6484 6370 , IKRU/LCU 7970 7755 TJF 8045 7825 TJE 8281 8045 TJD 8506 8255 TJC 8661 8395 TJB 8825 8525 TJA 8982 8625 Sag River 9252 8729 Base of Sag River 8797 HOT NA NA GOC NA NA Start of Slotted Lnr 9674 8757 40 feet of LOC TD of Well 10640 8797 966' of slotted liner ,,, Well Plan Summary Page 1 Casin§/Tubin{ Pro ram: Wt/Ft Hole Siz~ Csg/ ' Wt/Ft~ Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' 31731' 1117111' 13 1/2 10 3/4 45.5 NTSOLHE BTC 3666 31/31 3697/3695 9 7/8 7 5/8 29.7 NT95HS NSCC 9644 31/31 9675/8757 6 3/4 4 1/2 12.6 LB0 NSCC 1116 9525/8757 10640/8797 Logging Program'. I Open Hole Logs: I Cased Hole Logs: 9 7/8" MWD Dir/GR 6 3/4" MWD Dir/GR None Mud Program: ISpecial design considerations I m~ Flow Pro ® Polymer system in 6 3/4" horizontal hole I section. Surface Mud Properties: I 13 1/2" hole section Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 100 20 15 20 8.5 15 tO tO tO tO tO tO tO 9.2 300 60 60 80 10 25 Intermediate Mud Properties: 19 7/8" hole section Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 9.2 20 10 5 30 8.5 8 tO tO tO tO tO tO tO 10.5 50 20 10 50 10 <6 Intermediate (2) Mud Properties: I NOT APPLICABLE Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 10 15 5 30 8 <6 to to to to to to to 9.0 30 20 10 50 9 <6 Well Plan Summary RECEIVED DEC, 20 1995 Alaska Oil & Gas Cons. Commission Anchorage Page 2 Production Mud Properties: 1 6 3/4" hole section Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 10 15 5 30 8 <6 to to to to to to to 9.0 30 20 10 50 9 <6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional'. [KOP: [ 3401' Maximum Hole Angle: Close Approach Well: 87 de~rees E-8 26' at 1050'md/lO49'tvd The above listed wells will be secured during the close approach. Cement Data: Casing/Liner Lead: Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 10 3/4" 1040/12.0/2.17 375/15.8/1.16 Perm & Class "G" 7 5/8" NA 1000/15.6/1.20 Class "G" 4 1/2" none NA NA Well Plan Summary RECEIVED DFC 2 0 199~ Alaska 0il & Gas Cons. Commission Anchorage Page 3 Operations Summary E-34 1. MIRU drilling rig. N/U diverter and function test same. , Drill 13 1/2" hole to surface casing point. Run and cement surface casing. Nipple up BOPE and function test same to 5000 psi. . PU 9 7/8" BHA and RIH. Test casing to 3000 psi for 30 minutes. Drill 10' of new hole and perform leak off test. 4. Drill 9 7/8" intermediate hole with MWD to intermediate casing point. 5. MU and run 7-5/8" casing string and cement as per well plan. . RIH with 6 3/4" BHA and MWD and drill out cement to float equipment, test casing to 3500 psi for 30 minutes. Drill 10' of 6 3/4" hole. , Convert to Ml's FIo Pro® mud system. Drill remaining 6 3/4" hole to TD while logging with MWD tools. 8. Make 7 5/8" scraper and 6 3/4" hole opener run to TD. Circulate hole clean. , Run 4-1/2", L-80 slotted liner assembly with horizontal packer. Set packer and circulate out FIo Pro® mud from liner with sea water. POOH. 10. PU tubing tail, a 7 5/8" x 3 1/2" production packer, and 3 1/2" tubing, RIH to desired depth, displace seawater with seawater and corrosion inhibitor. 11. Set packer and test integrity of tubing. 12. ND BOPs, NU tree and test same. 13. Freeze protect well thru shear valve located in the top GLM station. 14. Release rig. o Anticipated BHP: o Maximum Anticipated Surface Pressure: o Planned Completion Fluid: 3520psi @ 8800' SS 3520 psi @ 8800' TVD SS 2800 psi 8.6 ppg filtered sea water Notes: a. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. b. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). c. Based on previous logs on E Pad, no potential productive zones are anticipated above 8300' TVD (Sag River). d. No potential hazardous levels of H2S are anticipated in this well. RECEIVED DEC 2 0 1993 ^l~ska Oil & Gas Cons. Commission Anchoraoe · Prudhoe Bay Drillin .- Prudhoe Bay, Alaska E-PAD Well' # E-84 File' E-84 WP8 NALL ! BU~TRN' t t/15/19~3 R, till Im IPoo iooo Goo (oo '400 I:O0 ~00 800 400 &O0 800 lO00 1200 1400 $&O0 1900 2000 ~00 ~400 i~O0 2900 300B 3200 3400 BXL I~'A vS ~.a~l HM~h ]0.~0 m. 7,02~ In, CRITIC J d_ POINT D~TA ND lIE IN, ~ 65.2' 0 Kul~U-c~ / Pu~ ~5 STAqT C)- ]4JIL~ 0 1.00 ]~G/IO0 e 3.00 ~100 ~ ~ ~IL~ 3401 e ].00 ~100 F~ ~74 / ~ / S~ 3707 ~ ~ 4708 E~ ~ ~IL~ 5518 ~o~e 6484 ]~ / L~ 7970 ~ 8045 T~ 8281 ~JD 8506 ST~T ~ 8531 ~ / ~]L~ e ~,00 ~G/i00 T~ 8~61 ~JB 88~5 T~ 8982 ~ Ri~ 995g ~ ~IL~ / 9375 L]~ ~T ~ 9~75 ~T ~ / 10640 lnc Azl ~ I~h £c~Jt 0.00 0.00 0 0 O 0.00 0.00 65 0 0 0,00 0.00 000 0 0 5.00 79.70 0,00 O, OO 0,00 O, O0 3.05 13,06 ,17 2 ,17 o17 ~ ,17 P ,17 05. ID ~5,16 05.16 6~, 16 65. l& 65.16 65.16 65.16 31.17 71.&0 44.07 56.47 79.~ 77.84 01,33 87.62 ~-.50 07,6~ ~..50 87.6g IL~)9 4 21 ~400 8 43 370'5 ~ 11 50 46c~-'~ 70 177 ~G9 .170 ~70~17 710 ~ ~2 !197 g~5 ~ .~9 ~ /~3 1373 c) RECEIVED DEC 2 0 1993 Alaska Oil & Gas Cons. Commission Anchorage 1301 °i 17' · ?gTO 143 ]k~U / L~J 1~04, ~, 17' I 8)4~ M] T,F .... '~To at,l?- · O~tl lQ T,)C ..LLOL..._ __ ~ ~.~' ~ 8731 ND -~00 0 ~00 400 &O0 800 1000 i~O0 1400 1~00 1900 ~L ~0~ ~E: 74,14 ~~ ~.47' I ~ ~ T~ ' ' ' ' , , , i i i t i i i i i i i , i 1700 1800 ~00 ~000 aloo ~00 ~00 ~400~00 ~00 aTOO~00 ~00 30003100~00 ~00 3400~00 ~00 ~ ~OH ~: 74.14 Pnudhoe Boy De iLLin~ Pp udhoe Boy, ALcskc E-PAD V/eli' ~ E-34 ! B/15/lggg 7,!7 ~ F~LLIBURTBN E40o POINTS t~IZ'3.9"3 N/A N/A N/A N/A N,/A ~73 4.go J 04 9.c~ _8~-C1_ _m_ 7'3.10 N/A NZA I~A N/A N/A NVA N/A hVA N/A N,,'A N/A N/A N/A N/A NVA N/A N/A N/A NVA N/A N/A N/A N/A N/A N/A - N,/A N/A N/A N/A N/A OJ:]O 440.10 71~J~) ICCL40 N/A N/A N/A N,/A N/A N/A N/A N/A I'~A N/A N/A N/A N,,'A N/A N/A WA N/A N/A tu,~ N/A N/A NXA N/A N/A N/'A N/A N/A N,'A N/A R'ECEIVED DEC 2 0 199b Ai~sk~ Oil & Gas Cons. Commission ' ~mchorage ITEM (1) Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS APPROVE DATE [2 thru 8] (4) Casg [14 thru 22 (5) BOPE [~2~ thru 2 Lease $ Well YES 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. ~. 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient und~.dicated acreage available in this pool ............. 6. Is well to be deviated $ is wellbore plat included .................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ e 10. 11. 12. 13 14 15. NO Does operator have a bond in force ................................... Is a conservation order needed ....................................... ~'~ Is administrative approval needed .................................... Is lease nL~nber appropriate .......................................... Does well have a unique name & nL~nber ................................ Is conductor string provided ......................................... ~ . Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................. ~~_ .. Is a diverter system required ..................... Is drilling fluid program schematic & list of equipment adequate ..... _~. Are necessary diagrams & descriptions of diverter & BOP.~E. attached .... _~_ Does BOPE have sufficient pressure rating -- test to ~~ psig ..... Does choke manifold comply w/API RP-53 (May 84)... Is presence of H2S gas probable ...................................... JREMARKS 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. (6) Other iff. CC_ "'?/':~ ,"':~ '- 29 [29 thru 31] 30. 31. ? (7) Contact .,,'~ .... G :iL, '"'7~ 32. [32] (8) Addl 33. geo 1 ogy' en.q i nee r i nq' ' TAE~ l~_~_[~$ I cev 6/93 jo/6.011 FOR EXPLORATORY $ STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone number of contact to supply weekly progress data ...... Additional requirements ............................................. Additional INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE /~/'/." MERIDIAN: //' .,,,,/' ,/ remarks' UM SM WELL TYPE' Exp/~./,N~. Redrill Inj Rev 0 --I "rz ~--~0 (.n --t Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: BIT RUN 4 KRELL/VAAGEN G. GOODRICH E - 34 (34-32-12-14) 500292243700 BP EXPLORATION (ALASKA) INC. SPERRY SUN DRILLING SERVICES 08-FEB-94 BIT RUN 5 KRELL/VAAGEN J. HABERTHUR BIT RUN 6 KRELL/VAAGEN G. GOODRICH BIT RUN 7 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD JAHN/VAAGEN J. HABERTHUR BIT RUN 8 JAHN/VAAGEN J. HABERTHUR 6 liN 14E 168 5O0 67.70 65.00 30.20 BIT RUN 9 JAHN/VAAGEN J. HABERTHUR OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 20.000 80.0 2ND STRING 13.500 10.750 3664.0 3RD STRING 9.875 7.625 9358.0 PRODUCTION STRING 6.750 10742.0 REMARKS: MWD - DGR ALL DEPTHS ARE MEASURED BIT DEPTHS. MWD RUNS 1 THROUGH 3 WERE DIRECTIONAL ONLY. MWD RUNS 4 THROUGH 6 WERE DIRECTIONAL WITH DGR. MWD RUNS 7 THROUGH 9 WERE SLIMHOLE GAMMA RAY. GAMMA RAY DATA FROM 10440 - 10470' MD IS FROM THE MAD PORTION AT THE BEGINNING OF MWD RUN 9. BEFORE & AFTER MUD CHANGE GAMMA RAY BACKGROUND AT 9290' MD INDICATED A 1.45+ AAPI CHANGE. ALL GAMMA RAY DATA PROVIDED FROM DOWNHOLE RECORDED DATA. THE SLIMHOLE GR WAS BLOCK-SHIFTED 4' UP TO CORRELATE WITH THE 8.5" GR. THEY WERE MERGED AT 9336' MD. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 6763.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 10677.0 EQUIVALENT UNSHIFTED DEPTH - BIT RUN NO MERGE TOP MERGE BASE 6814.0 8319.0 8319.0 9125.0 9125.0 9369.0 9369.0 9782.0 9782.0 10530.0 10530.0 10742.0 NO DEPTH SHIFTS WERE APPLIED. CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 97 Tape File Start Depth = 10742.000000 Tape File End Depth = 6700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24256 datums Tape Subfile: 2 195 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 6763.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8265.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 13 -JAN- 94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 8319.0 6814.0 8319.0 0 0.0 0.0 TOOL NUMBER P0211CG6 9.875 3664.0 LOW SOLIDS 10.20 45.0 8.5 1700 5.2 0.000 0.000 0.000 0.000 0.0 129.0 0.0 0..0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 ROP MWD 68 1 AAPI 4 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 Tape File Start Depth = 8319.000000 Tape File End Depth = 6763.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9340 datums Tape Subfile: 3 101 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 8266.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9093.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 15-JAN-94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 9125.0 8319.0 9125.0 0 0.0 0.0 TOOL NUMBER P0211CG6 9.875 3664.0 LOW SOLIDS 10.50 44.0 8.5 1600 5.0 0.000 0.000 0.000 0.000 0.0 140.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 ROP MWD 68 1 AAPI 4 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 21 Tape File Start Depth = 9125.000000 Tape File End Depth = 8266.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 29414 datums Tape Subfile: '4 84 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9094.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9336.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. 16-JAN-94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 9369.0 9125.0 9369.0 0 0.0 0.0 TOOL NUMBER P0211CG6 9.875 3664.0 LOW SOLIDS 10.60 50.0 8.5 1350 4.8 0.000 0.000 0.000 0.000 0.0 155.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 7 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 Tape File Start Depth = 9369.000000 Tape File End Depth = 9094.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10994 datums Tape Subfile: ~5 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9239.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9703.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: MWD RUN 7. 18-JAN-94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 9782.0 9369.0 9782.0 0 0.0 0.0 TOOL NUMBER NGP5.74-098 6.750 9358.0 FLO PRO 9.10 51.0 8.0 38000 5.6 0.000 0.000 0.000 0.000 0.0 125.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 13 Tape File Start Depth = 9782.000000 Tape File End Depth = 9239.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32676 datums Tape Subfile: 6 76 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9703.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10440.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 21- JAN-94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 10530.0 9782.0 10530.0 0 0.0 0.0 TOOL NUMBER NGP5.74-098 6.750 9358.0 FLO PRO 9.30 60.0 9.0 42500 5.0 0.000 0.000 0.000 0.000 0.0 138.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 ROP MWD 68 1 AAPI 4 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 20 Tape File Start Depth = 10530.000000 Tape File End Depth = 9703.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15960 datums Tape Subfile: 7 83 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10440.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10682.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 9. 23-JAN-94 MWD 1.98, MSC 1.32 3.93, SLIMHOLE 5.74 MEMORY 10742.0 10530.0 10742.0 0 0.0 0.0 TOOL NUMBER NGP5.74-098 6.750 9358.0 FLO PRO 9.40 62.0 9.0 42000 5.2 0.000 0.000 0.000 0.000 0.0 142.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : E - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 ROP MWD 68 1 AAPI 4 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 Tape File Start Depth = 10739.000000 Tape File End Depth = 10440.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34474 datums Tape Subfile: 8 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS 94/ 2/ 7 01 **** REEL TRAILER **** 94/ 2/ 8 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 8 FEB 94 9:32a Elapsed execution time = 24.77 seconds. SYSTEM RETURN CODE = 0