Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
193-136
XHVZE Pages NOT Scanned in this Well HistOry File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and vieWable by direct inspection. /~'j ~,~_.~,~ File Number of Well History File PAGES TO DELETE Complete RESCAN E! D Color items - Pages: GmyScale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: Other- Pages: DIGITAL DATA n Diskettes, No. Other, No/Type OVERSIZED .El Logs 'of various kinds . [] Other COMMENTS: Scanned by: ~ve~y Dianna(~~Nathan Lowell · _ ! , TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 193-136 302-072 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22403-00 4. Location of well at surface 9. Unit or Lease Name 1425' SNL, 276' WEL, SEC. 33,.T11N, R13E, UM .i'~~ Prudhoe Bay Unit At top of productive interval 802' SNL, 1982' EWL, SEC. 03, T10N, R13E, UM · At total depth~i 10. Well Number 869' SNL, 2000' EWL, SEC. 03, T10N, R13E, UM ~ . ~. Y-37 5. Elevation in feet (indicate KB, DF, etc.) .6. Lease Designation and ~enl~;;J~.~ ......... 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 79.10' ADL 047471 12. Date Spudded10/14/1993 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'l 0/27/1993 3/14/2002 115' water depth' if OffshoreN/A MSL 116' NO' °, complotionsZero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 11015 9219 ETI 10976 9181 FTI [] Yes [] NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIL / BHCS / GR / MWD 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'I'rOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110' 30" ->70 sx Arctic Set (Approx.) 10-3/4" 45.5# NTBOLHE 30' 3372' 13-1/2" 1281 sx CS II1~ 375 sx Class 'G' 7-5/8" 29.7# NT95HS 27' 10659' 9-7/8" _>65 sx Class 'G' 5-1/2" 17# 13Cr80 10491' 11015' 6-3/4" 89 sx Class 'G' I 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, 13Cr 10493' 10428' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10650' Set Whipstock 9300' P&A with 25 Bbls Class 'G' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER'BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS'MCF WATER'BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE TM'~,' 28. CORE DATA ..~ ~ '~ ~ Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or w~'t~r 'fftt dbre~cHIps. /H!~ ? '"'"'" ~'\/ 'i 7 No core samples were taken. Fi,:":~ Alaska Oil & Co s, (;ot missio Anchorage -'- I A I -- NEDJUL Form 10-407 Rev. 07-01-80 '[, Submit In Duplicate 3 0 2OO'2 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Subsea Sag River 10640' 8776' Shublik 10659' 8794' Sadlerochit 10736' 8869' Alaska 0il & Anch0ra~e 31. List of Attachments: Summary of Daily Drilling Reports 32. I hereby certify that the fore.going is true and correct to the best of my knowledge Signed Terrie .ubble ~r,~,~~"'/' ~ Title Technical Assistant Date Y-37 193-136 302-072 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. INSTRUCTIONS GENE~U.: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: if this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. IiCANNED JUL :IL 0 2002 Form 10-407 Rev. 07-01-80 Well: Y-37A Rig Accept: Field: Prudhoe Bay Unit Rig Spud: APl: 50-029-22403-01 Rig Release: Permit: 202-046 Drilling Ri~l: 03/13/O2 03/16/O2 O3/31/O2 Nabors 3S PRE-RIG WORK 02/13~02 MITOA (FAILED) PPPOT-T PASSED (PREP FOR CTD). PT MV & SWAB (FAILED). 02/14/02 CTD SCREENING. PT MASTER AND WING VALVES TO 4360 PSI PASSED. 02/25/02 SET WHIDDON CATCHER SUB @ 10443' SLM. PULLED STA #'S 7, 5, 4, AND 1 LGLV'S. 02/26/02 CONTINUE PULL LGLV'S. SET DGLV'S AND I CIRC VALVE. MIT. I.A. @ 2500 PSI. 02/27/02 FINISHED PUMPING 275 BBLS CRUDE DOWN IA. DUMMY OFF ALL GLM'S. PERFORM SUCCESSFUL MITIA. CIRC GLV MISSING IN TUBING. NOT IN CATCHER SUB. BRUSHED TUBING AND ALL MANDRELS. ONGOING MIT. I.A. @ 2500 PSI. WITH SLICKLINE. GOOD TEST! 02/28/02 RAN 20' DUMMY WHIPSTOCK TO 10770' CORRECTED DEPTH. RAN 3.25 LIB TO SAME.HARD PACKED FILL WAS IMMBEDDED IN FACE OF LIB. ( NOTE: 1" GLV W/BK LATCH LOST IN HOLE 19" LONG ) LEFT WELL SHUT IN. 03/1 2/02 PUMP 270 BBLS 2% KCL DOWN TBG TO KILL WELL. FREEZE PROTECT TBG W/40 BBLS DIESEL. TBG PRESSURE WAS 250# AND FALLING. NEXT UP IS E-LINE TO SET WHIPSTOCK. RIH W/4.5" X 5.5" BAKER GEN I WHIPSTOCK (12' OAL), TIE INTO ATLAS LOG DATED 10 NOV 1993 AND SET TOP OF WHIPSTOCK AT 10650'. WHIPSTOCK ORIENTATION WHEN SET WAS 8.9 DEGREES LEFT OF HIGH SIDE. GOOD INDICATION OF SETTING AT SURFACE. RA PIP TAG IN WHIPSTOCK AT 10659 MD. NOTIFY PAD OPERATOR OF STATUS. ,SCANNED JUL .!. 0 2002 ,, Legal Well Name: Y-37 Common Well Name: Y-37^ Spud Date: 3/13/2002 Event Name: REENTER+COMPLETE Start: 3/12/2002 End: 3/31/2002 Contractor Name: NABORS Rig Release: 3/31/2002 Rig Name: NABORS 3S Rig Number: :.::: ~::i i:i: .:i: i!~iiT°' iH.~S::::~i~i~ i!~ ::::~l~'i:~:~ie'' DescriptiOn of OPeratiOns :~ 3/12/2002 00:00 - 13:00 13.00 RIGU ~P PRE Turn key move to Y-37a 13:00 - 00:00 11.00 RIGU IN WAIT PRE Wa~ on s~e prop, Installation ~C,well house removal,and pad leveling. 3/13/2002 00:00 - 13:00 13.00 RIGU N WAIT PRE Wait on gravel; grade and level Io~tion. 13:00 - 15:00 2.00 RIGU P PRE Position rig over well. Required pulling off and releveling. 15:00 - 20:30 5.50 RIGU P PRE Spot pits, raise derrick, RU piperack, floor, wires, lines, steps, handrails, etc. Spot DS ~. 20:30 - 00:00 3.50 RIGU P PRE A~pt rig 20:30 hm. NU BOPE. Fun~ion rams. 3/14/2002 00:00 - 00:30 0.50 RIGU P PRE Finish NU BOPE. 00:30 - 03:00 2.50 BOPSUF P DECOMP Grease valves and RU for BOP test. 03:00 - 09:00 6.00 BOPSUF P DECOMP Test BOPE. Witness waived by AOGCC's Jeff Jones. 09:00- 10:00 1.00; BOPSUF N RREP DECOMP Rebuild choke manifold valve. 10:00 - 10:30 0.50 BOPSUR P DECOMP Finish BOP test. 10:30 - 11:30 1.00 BOPSUR P DECOMP RU BPV lubri~tor. Pull ~C. Well on vac. 11:30- 12:00 0.50 KILL P DECOMP Safe~ meeting. 12:00 - 12:45 0.75 KILL P DECOMP Load well with SW 4.0 BPM; 300 psi. 12:45- 13:15 0.50 KILL N SFAL DECOMP Failure of DS pump on gear end. Housing ruptured. All gear oil ~ught in seconda~ containment. 13:15 - 14:00 0.75 KILL P DECOMP Continue BH kill. Final inje~ivity 4.0 BPM; 280 psi WHP. 14:00- 15:15 1.25 P~ P DECOMP PU inj. MU ~menting B~. 15:15- 16:45 1.50 P~ P DECOMP PT MHA. Displa~ methanol from ~il. Stab inj. 16:45 - 19:15 2.50 P~ P DECOMP RIH cimulating 0.5 BPM, no returns. 19:15 - 19:45 0.50 P~ P DECOMP Tag whipstock 10688' CTM. Corm~ depth (-36'). Repeat tag. Pull back into tubing tail. No overpulls, but high string ~ (55k up at 40 FPM). 19:45 - 20:15 0.50 P~ ;P DECOMP Safe~ meeting with ~mentem. 20:15 - 21:30 1.25 P~ P DECOMP RU ~mentem. Take on additional fluid fo~ uprights to flood backside to keep hole full. 21:30 - 22:00 0.50 P~ P DECOMP Pump across top to fill hole. 22:00 - 22:06 0.10 P~ P DECOMP Pressure test lines to 4000 psi. 22:06 - 22:23 0.28 P~ = DECOMP Mix and pump bentonite ~ment. 5bbl ~ment neat, 15bbl ~ment with aggmgrate, 5 bbl ~ment neat. Displa~ to ~il at 2.2 bpm 1060 psi. Shut in choke. 22:23 - 22:33 0.17 P~ ~ DECOMP Bull head ~ment to Pedorations at 2.6 BPM 970 psi CTP. WHP 135 psi. Locked up when lead ~ment hit pedorations. Let WHP build to about 700 psi. 22:33 - 23:02 0.48 P~ P DECOMP Open to FOC and lay in ~ment one for one. Top of ~ment estimated 9300. POOH to 9000'. Squeeze to 1200 psi. Pe~s did not take much more (0.5 bbl max). 23:02 - 23:50 0.80 P~ P DECOMP RIH circulating 1.7 ppb biozan at FOC. Contaminating the ~ment cimulating 2 bbl for each bbl of ~ment. RIH to 10640' 23:50- 00:00 0.17 P~ P DECOMP POH 3/t5/2002 00:00 - 03:00 3.00 P~ P DECOMP POH lay down ~menting no=el. Jet BOP. 03:00 - ~:00 1.00 S~HIP P WEXlT MU Milling assembly. ~:00 - 06:45 2.75 S~HIP P WEXIT RIH with milling assembly BHA~2 06:45 - 08:00 1.25 S~HIP P WEXlT Tag XN 10477' CTM. Corm~ depth (-30') to 10447' ELMD. Mill XN and dress 08:00 - 08:45 0.75 S~HIP P WEXlT RIH. MW sta~ing 10646'. Mill ~ment to 10651'. Stall here. No overpull. Ease into it again. Stall 10651'. Must be our pinch point. 08:45 - 11:00 2.25 S~HIP ~ WEXlT Mill window. Slow geffing sta~ed, grabby with several stalls at 10651'. Time drill flint 0.5' at 2.6 BPM; 2100 psi FS. Full returns. Printed: 411/2002 11:16:19 AM SCANNED JUL 1 0 2L002 Legal Well Name: Y-37 Common Well Name: Y-37^ Spud Date: 3/13/2002 Event Name: REENTER+COMPLETE Start: 3/12/2002 End: 3/31/2002 Contractor Name: NABORS Rig Release: 3/31/2002 Rig Name: N^BORS 3S Rig Number: Ffo~T~ ':,~:.~;iil ~i~i~ ~ :ii~ i. : iD6s~riPtionofoperationS 3/15/2002 11:00 - 18:00 7.00 STWHIP P WEXlT Start pushing on it a little. Mill to 10653' with about 2000 # WOB, pumping FIo-Vis sweeps. Progress slowed. Stacking up to 6000 WOB w/o much motor work. Strange milling: stacking with 500 psi CTP above FS, then release brake, got wt back. Continue to crawl. Stall at 11657.4'. Acts like bottom of window. 18:00 - 20:55 2.92 STVVHIP P WEXlT Continue to mill 10658.3 Stalled twice Acts like string at base of window. Continue milling. Mill from 10,659' to 10661 at an average rate of 7 ft/hr @ 2600 psi at 2.6 bpm FS = 1950 psi. 20:55 - 22:10 1.25 STWHIP P WEXlT Stopped making progress at 10661.5. Picked up and made numerous attempt to mill NO progess. Decided to POH and look at mill. 22:10 - 23:15 1.08 s'rWHIP P WEXlT Take on mud and circulate mud to mill. 23:15- 00:00 0.75 STWHIP N DPRB WEXlT POH laying in new mud. 3/16/2002 00:00 - 01:05 1.08 STWHIP N DPRB WEXlT POH to inspect milling assembly. 01:05 - 02:00 0.92; STWHIP N DPRB WEXIT Diamond mill under gauge at 3.56". String mill in gauge. Replaced one missing set screw in the coil connector. MU ~arabolic diamond mill and string mill. 02:00- 03:55 1.92 STWHIP N DPRB WEXlT RIH to 10650 03:55 - 05:48 1.88 S'I'WHIP :) WEXIT Stalled once at 10,657.5. Ream to botttom 10661.5. Drill formation at 2.6 bpm 3000 psi F.S. = 2700 psi. drill to 10670. Window 10651 to 10657.5. Back ream at 2.4 ft/min 2.6 bpm @ 2700 psi to 10, 644. RIH dry and tag. PU clean. PU to 10640 make second dry tag. Clean both ways. 05:48- 07:30 1.70 STWHIP = WEXlT POOH. 07:30 - 08:00 0.50 STWHIP P WEXlT LD milling BHA. 08:00 - 09:45 1.75 DRILL P PROD1 MU drilling BHA: M09, 3.28 deg BHI motor, Anadril MWD, Weatherford 36 deg or,enter. Test or,enter. Tough getting motor stuffed into tubing. 09:45 - 12:00 2.25 DRILL P PROD1 RIH. Shallow test good. Did not check or,enter again. Correct depth at flag (-38'). Continue RIH. Wt bobble but fell thru 10656'. Tag TD 10667'. 12:00 - 12:15 0.25 DRILL P PROD1 PUH above window and orient high left. Looks like we're getting 1:1 on or,enter. ' 12:15 - 14:30 ' 2.25 DRILL P PROD1 Drill 2.3/2600 with TF wandering between 20L and 15R. Ful~ returns. Drill to 10711'. 14:30 - 15:30 1.00; DRILL P PROD1 Orient to keep us a little more on the left side. T~j3ug/fgetting clicks in OH with high bend motor. PU?...J.e,c~sing and get them there. 15:30 - 18:15 2.75 DRILL :) PROD1 Drill 2.5/2800. Gettin' 50~Jj~j"DLs - Iookin' good. Typical 10 - 20 FPH Shublik dri~JJiag~~ and it stalls. Drill to 10~. :___~..~ ~-:~, 18:15 - 22:30 4.25 DRILL = PROD1 Pu survey. Directionally drill to 10,810 2.7 / 2.7 bpm 80 psi.(F.S.=3090 psi) 22:30 - 22:50 0.33 DRILL N DPRB ~ Suffiently away from old well bore to get good Azimuth. Need P~RB 80 L. Attempt to orient IIIIIII no responce. 22:50 - 00:00 1.17 DRILL N/ PROD1 Attempt to orient IIII no responce. PU into casing. Tool face changed 180R pulling into casing. Orient Try 3 clicks got 4, try ~ 3 got 1, try 2 got 2. 3/17/2002 00:00 - 02:50 ~ DRILL N DPRB PROD1 RIH to bottom. Unable to get toolface change. PU try for 5 j clicks got 3. Try for additional 5 clicks get 4. Continue attempting to orient. Unable to orient on bottom. Regardless of the toolface set in cased hole the toolface returns to the Printed: 411/2002 11:16:19 AM .,d NED JUL :1. 2002 K~-~L STATE OF ALASKA I~,~ ALAS AND GAS CONSERVATION COM ION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: ~a Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. I~ Development KBE = 79.10' I"1 Exploratory 7. Unit or Property Name 3. Address [~ Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 I"! Service i8. Well Number 4. Location of well at surface ../ ./ -,~' Y-37 1425' SNL, 276' WEL, SEC. 33, T11N, R13E, UM 9.~ i'.~r At top of productive interval 802' SNL, 1982' EWL, SEC. 03, T10N, R13E, UM 10.APl' v/, At effective depth 50-029-22403-00 860' SNL, 1997' EWL, SEC. 03, T10N, R13E, UM 11. Field and Pc~oJ At total depth Prudhoe Bay Field / Prudhoe 869' SNL, 2000' EWL, SEC. 03, T10N, R13E, UM Bay Pool 12. Present well condition summary Total depth: measured 11015 feetv Plugs (measured) true vertical 9219 feet Effective depth: measured 10976 feet Junk (measured) true vertical 9181 feet Casing Length Size Cemented MD TVD Structural Conductor 80' 20" 270 sx Arcticset (Approx.) 110' 110' Surface 3342' 10-3/4" 1281 sx CS III, 375 sx 'G' 3372' 3228' Intermediate Production 10632' 7-5/8" 265 sx Class 'G' 10659' 8954' Liner 524' 5-1/2" 89 sx Class 'G' 10491' - 11015' 8715' - 9219' Perforation depth: measured Open: 10644' - 10658', 10736' - 10770'RECEIVED true vertical Open: 8061'- 8074'. 8949'- 8982' FEB 2 0 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR tubing to 10493'. Alalka0il&GasCoas. Commissi°n A. ct~'age Packers and SSSV (type and measured depth) 7-5/8" x 4-1/2" Baker SABL-3 packer at 10428' and 4-1/2" Otis Landing Nipple at 2098'. 13. Attachments I~] Description Summary of Proposal I-! Detailed Operations Program I-I BOP Sketch 14. Estimated date for commencing operation 15. Status of well classifications as: March 11, 2002 I~! Oil I'"1 Gas I~ Suspended 16. If proposal was verbally approved Service Name of approver Date Approved Contact Engineer Name/Numbec Alistair Sherwood, 564-4378 Prepared By Name/Number: Sondra Stewman, 564-4750 17. S,gnedl hereby certify that the for ~ioi~ is tr.r.r.r.r.r.r.r.r.~nd corr~j~t to the .... best of my knowledge Conditions of Approval: Notify Commission so representative may witness ~-' ~ ,c, '5'5"'"'v~, ~ --'~,.'~ ' Approval No. Plug integrity BOP Test % Location dlearance ...... Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission Original Sl~n~ ~y Commissioner Date Form 10-403 Rev. 06/15/88 ;I kl & I Submit Ir ate February 19, 2002 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 BP Exploration Alaska Inc. Drilling & Wells Coiled Tubing Drilling Team Attention: Tom Maunder Petroleum Engineer Subject: Well Y-37 CTD Sidetrack Prep Production well Y-37 is to be sidetracked to a new reservoir location using coiled tubing drilling. The following summarizes the procedure required to prep the well for drilling and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed completion is attached. Gas lift v/v's dummied off & inner annulus fluid packed Test wellhead seal integrity to 5,000psi. Mechanical integrity of IA tested with 2,000psi pressure test. Fluid pack & test mechanical Integrity of OA to 1,000psi Tree's master, wing & swab valves to be tested to 4,000psi. Drift to whipstock setting depth with 20' x 3.625" dummy assembly 4W' x 5W' whipstock to be run & set at 10,650'md, (8,787' tvd) P&A open perforations, above & below the whipstock using 10 bbls of cement. Whipstock setting and P&A operations are scheduled to commence 11m Mar & CTD operations are expected to follow on 18th Mar 2002. Y-37a will emerge from a window cut in 5W' liner at 10,650'. The 3sA'' OH sidetrack -2,240' long will be drilled with 23A'' CT through ZA of the Ivishak reservoir. It will be completed with a Bonsai style, (solid 33/16'' x solid/slotted 27A'') liner run from TD back into the 4~A'' tbg. Cement will be squeezed behind pipe from where the solid 2~A'' liner ends back into the 5~" liner. Production will come in through the 27A'' slotted section. Using the following targets for the Bonsai completion: window = 10,650'md, TD = 13,088'md, TOL = 10,400', Float & diverter = 12,300' and TOC = 10,500', then approx. 14bbls of cement will be pumped for hydraulic isolation. Alistair Sherwood CT Drilling Engineer Tel: 564-4378 Fax: 564-5510 Cell: 440-8301 sherwooa@bp.com TREE = 4-1/16" 5M ClW ;~VELLHEAD ' 5MFM( ACTUATOR = BAKER ~'. ~-~/"~ ...... 80.9; BF. ELEV = 27.22' KOP= 2100' '~"Ah'~i~'"~- ............. ~,'~-'@'"~'~' Datum MD = 10663' r , 10-3/4" CSG, 45.5ff, NT-80, ID = 9.953" H , :3380' Y-37 2098' 4-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT' MANDRB. S rMini ,m. um ID: 3.725"@ 10477' 4-1/2 PARKER SWN NIPPLE 10373' 1O428' 10459' PARKER SWS NIP, ID = 3.813" J, TOPOFS-1/2"LNRH 10491' 4-1/2" ~BG, 12.6~, 13Ci~ 0.0152 bpf, ID = 3.958" 10493' j ........ 7-,5/8" (:;~G, 29.7#, NT-95~, ID = 6.875" H 10659' ~ i 111111 Pl~ORA333N SU~ RB= LOG: BHCA ON 10/27193 ANGLE AT TOP PEP, F: 17 @ 10644' Note: Refer to Production DB for historical perf data 'SIZE SPF INTERVAL OpnlSqz DATE' 3-3/8" 6 10644- 10658' O 10/27/93 3-3/8" 6 10736- 10770' O 10/27/93 I I-! 10976' I 5-1/2" LNP-, 17#, 13CR, 0.0232 bPf, ID = 4.892"H 11015' L 7-5/8" x 4-112" BKR SABL-3 PKR, ID = 3.93" 4-1/2" PARKER SWS NIP, D = 3.813" 4-1/2" PARKI~ SWN NIP, ID = 3.725" 4-1/2" WLEG, ID = 3.958" H B. ND TI' LOGGED 11/10/931 DATE REV BY COMdENTS DATE REV BY COIVlIVlEN~ . 10/31/93 MDO ORIGINAL COMPLETION 03/01/01 SlS-OAA CONVERTED TO CANvAS '' 03/08/01 SIS-LG FINAL ' 06/25/Ol RNrrP CORRECTIONS PRLE)HOE BAY UNIT WELL: Y-37 ~ No: 93-1360 APl NO: 50-029-22403-00 SEC 33, T11N, R13E BP Exploration (Alaska) .~/:;{EE = 4-1/16" 5M CIW ELLHEAD = 5M FMC ACTUATOR = BAKER KB. ELEV = 80.9' BF. ELEV = 27.22' KOP = 2100' Max Angle = 42 @ 3378' Datum MD = 10663' Datum TVD = 8800' SS I 10-3/4" csG, 45.5~, NT-80, ID = 9.953" M 3380' Y-37a 2098' H4-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT MANDRB_S IMinim. um ID = 3.725" @ 10477' 4-1/2 PARKERSWN NIPPLE I TOP OF LNR I--I o4oo' I J TOP OF 5-1/2" LNRI--~ 10491' 4-1/2" 'rBG, 12.6~, 13CR, 0.0152 bpf, ID = 3.958" 10493' 7-5/8" CSG, 29.7#, NT-95HS, ID: 6.875" Id 10659' Note: 7-518" Csg shoe {~ 10,630' Loggers Depth Whipstock set at 10,650' Perfs sqz'd past whipstock PERFORATION SUMMARY REF LOG: BHCA ON 10/27/93 ANGLE AT TOP PERF: 17 @ 10644' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10644 - 10658' O 10/27/93 3-3/8" 6 10736 - 10770' O 10/27/93 5-1/2" LNR, 17#, 13CR, 0.0232 bpf, ID: 4.892" 10976'I 11015'I ,~ XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX 10373' H4-1/2" PARKERSWS NIP, ID= 3.813" I 10428' M7-5/8" x 4-1/2" BKR SABL-3 PI<R, ID = 3.93" I 10459' H4-1/2"PARKERSWSNIP, ID=3.813" I 10477' H 4-1/2" PA RKER SWN NIP, 19=3.725" I 10493' I--~4-1/2"WLEG, 10=3.958" I I 10463' I-I EL~DTr LOGGED 11/10/93 I I o,5oo' I----IProposedTOCl 10945' ~-~3 3/16" x 2 7/8" XO I I13o88'~ IBonsai Completion Solid: 3 3/16" 6.Z# TC-II L-80 ID=2.8" Solid & Slotted: 2 7/8" 6.5# ST-L L-80 113=2.441" DATE REV BY COMMI~ITS DATE REV BY COMMI~ITS 10/31/93 MDO ORIGINAL COMPLETION 03/01/01 SIS-QAA CONVER'I'I~ TO CANVAS 03/08/01 SIS-LG FINAL 06/25/01 RN/TP CORRECTIONS 01/29/02 AS CTD Sidetrack Proposal PRUDHOE BAY UNIT WELL: Y-37 PERMIT No: 93-1360 APl No: 50-029-22403-00 SEC 33, T11N, R13E BP Exploration (Alaska) THE MATERIAL UNDER THIS COVER HAS BEEN ,, M. ICROFILMED ON OR BEFORE JANUARY 03,, 2001 M PL A T T H C:L01~MFILM.12K~ E IA L U N D IS M ARK E W E R R AOGCC Individual Well ~ Geological Materials Inventory PERMIT DATA T DATA_PLUS 93-136 93-136 93-136 93-136 93-136 93-136 93-136 5875 407 DAILY WELL OP SURVEY BHC/AC/GR DIFL/SP/GR GR/CCL ~0054-10985, OH/LWD ~ ~~COMP DATE: 11/10/93 1~~0/14/93-11/01/93 0-10616 ~E"10054-10956, 2&5" bL/~0630-10985, 2&5" ~260-10877 93-136 93-136 GR/CCL (JWL/PFC) ~"~0260-10877 PFC/CCL ~'~0620-10864 93-136 93-136 93-136 PFC/CCL ~0260-10877 PFC/CCL (PERF) ~/10620-10864 PFC/CCL (PERF) ~~10260-10877 93-136 PFC/GR/CCL 93-136 PLS 93-136 SBT/GR/CCL 93-136 SSTVD ~10532-10746 ~A~0500-10766 ~~10170-10882 -., L I0170-10882 ~/~10054-10985, 1&2"MD Page: 1 Date: 09/29/95 RUN DATE_RECVD 11/04/1993 11/30/1993 11/30/1993 11/30/1993 11/02/1993 11/02/1993 11/16/1993 11/16/1993 11/16/1993 11/16/1993 11/16/1993 11/16/1993 10/05/1994 10/13/1994 11/16/1993 ii/o2/i993 Are dry ditch samples required? yes ~_~nd receive~%$-- 9=s ~o ~ Was the. well cored? yes~____~alysis a description received? ycc ~ Are well tests required?~es ~___~eceived?~_ ¥~-~ Well is in compliance ~ Initial COMMENTS L~ STATE OF ALASKA S~ A OIL AND GAS CONSERVATION COMMI REPORT' OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development Exploratory Stratigraphic Sewice 4. Location of well at surface 1425' SNL, 276' WEL, SEC. 33, T11N, R13E At top of productive interval 801' SNL, 1991' EWL, SEC. 03, TION, R13E At effective depth 860' SNL, 3282' EWL, SEC. 03, TION, R13E At total depth 870' SNL, 2010' EWL, SEC. 03, TION, R13E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11015 feet 9219 feet 10976 feet 9182 feet Plugs (measured) Junk (measured) Other 6. . 11. Datum elevation (DF or KB) KBE=79.1 feet Unit or Property name Prudhoe Bay Unit Well number Y-37(21-03-10-13) Permit number/approval number 93.~136 / APl number 50- 029-22403 Field/Pool Prudhoe Oil Pool ORIGINAL Casing Length Size Structural -- Conductor 110 20x30 Surface 3319 10 3/4 Intermediate 10606 7 5/8 Production -- Liner 524 5 1/2 Perforation depth: measured 10736'- 10770' Cemented Measured depth True vertical depth BKB 270 sx Arcticset 163 163 1281/375 sx CS III/'G" 3372 3148 265 sx Class "G" 10659 8875 89 sx Class "G" 10491-11015 8714-9219 true vertical subsea 8950'- 8983' Tubing (size, grade, and measured' depth) 4 1/2", 13CR @10493' Packers and SSSV (type and measured depth) Packer @ 10428' & SSSV@2098' 13. Stimulation or cement squeeze summary See Attachment AUG Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 3006 5028 723 2460 2395 1839 841 2009 350 248 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations ~" 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that theJor0"gp[ng, is~true and correct to the best of my knowledge. Signed ('-~~~--~ / /~t/4::;~ Tit leSenior TechnicalAssistantll Form 10-40'4 Rev 06/15/88 / Date SUBMIT IN DIdPLI(~ATE 09/16/94 © © WELL Y-37(21-03-10-13) Addperf Operation The following additional interval were perforated using 3 3/8" guns, 6SPF and 60° phasing. 10644' - 10658' MD SAG PERFS II STATE OF ALASKA ALA~IL AND GAS CONSERVATION COMMISSI~ . REPORT SUNDRY WELL OPERATIONS Stimulate Plugging 1. Operations performed: Operation shutdown Repair well 5. TyPe of Well: Development X Explor~o~/ Stratigmphic Pull tubing ._ Alter casing 2. Name of Operator BP Expio, ration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1425' SNL, 276' WEL, SEC. 33, T11N, R13E At top of productive interval 801' SNL, 1991' EWL, SEC. 03, TION, R13E At effective depth 860' SNL, 3282' EWL, SEC.03, TION, R13E At total depth 870' SNL, 2010' EWL, SEC. 03, TION, R13E 11015 feet 9219 feet Plugs (measured) 12. Present well condition summary Total depth: measured true vertical Perforate Other × 6. Datum elevation (DF or KB) KBE=79.1 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y.$7(21.o$-1o.13) 9. Permit number/approval number 93-136 / 10. APl number 50- 029-22403 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 10976 feet 9182 feet Junk (measured) Casing Length Size Structural -- Conductor 110 20x30 Surface 3319 10 3/4 Intermediate 10606 ' ~ 75/8 Production -- Uner 524 5 1/2 Perforation depth: measured" 10736'- 10770' Cemented Measured depth True vertical depth BKB 270 sx Arctic, set 163 163 1281/375 sx CS III/"G" 33 72 3148 · 265 ,ex Class "G" ' 10659 8875 89 sx Class "G" 10491-11015 8714-9219 .. true vertical subsea 8950'- 8983' Tubing (size, grade, and measured depth) 4 1/2~, 13CR @ 10493' Packers and SSSV (type and measured depth) Packer @ 10428' & SSSV@2098' 13. Stimulation or cement squeeze summary See Attachment RECEIVED JUN 30 1994 Alaska 0il & Gas Cons. t~ornrni~sion Anchorage Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 790 856 0 1068 5492 4211 181 1416 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations , Oil X Gas Suspended_._ Form 10-404 Rev 06115188 / 247 272 Sewice // Dar · ~,/~'/,~;~ SUBMIT IN DOPLI(~ATE 12/15/93 fjh 6/27/94 WELL Y-37(21-03-10-13) Hydraulic Fracture Performed a Hydraulic Fracture using the following fluids: FRAC TREATMENT FLUIDS PUMPED DOWNHOLE INJ TEST: 650 Bbls 20~ Gel DATA FRAC: 660 FRAC: 20 Bbls 40# Gel Prepad To Establish Rate 58 Bbls 40g X-Link Gel Pad 409 bbls frac design 160 bbls 20# Linear Gel Flush RECEIVED JUN ,~0 1994 Alaska 0il & (]as C~ns Cnmm~s~.,, Anchorab~ WELL COMPLETION OR RECOMP LETION REPORT AND LOG , i , , 1. Status of Well Classification of Service Well OIL [] GAS r-I St.lSPEM3ED [] ABANDONED [] SERVICE [] 2. Name of Operator ?. Permit Number BPExpl°rati°n ORIGINAL 3. Address 3. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 so.029-22403 4. Location of Well at surface 9. Unit or Lease Name ~ ~ ~. Prudhoe Bay Unit 1425' SNL, 276' WEL, SEC. 33, T11N, R13E ~~ 10. Well Number At Top Producing Interval ' Y-37 (21-3-10-13) 801' SNL, 1991' EWL, SEC. 3, TION, R13E :~erl~, ' ! 11. Field and Pool At Total Depth = 'l. · Prudhoe Bay Field/Prudhoe Bay Pool 870' SNL, 2010' EWL, SEC. 3, TION, R13E 5. Elevation in feet (indicate KB, DF, etc.) p. Lease Designation and Serial No. KBE = 79.1' I ADL 47471 '1''2. Date Spudded 13. Date T.D. Reached 14. Date Comp., Strap. or Aband. 115. Water Depth, if offshore 116. No. of Completions 10/14/93 10/27/93 11/10/93I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Perma~rcet 11015' MD/9219' TVD 10976' MD/9182' TVD YES [] ~ []I 2098'feat MD! 1900'(Approx.) :52. Type Electric or Other Logs Run DIL/BHCS/GR/MWD , 23. CASING, LINER AND CEMENTING FtE(X:)[~ .., SE1TING D~ ~ CASING SIZE WT. PER FT. i GRADE TOP BOTTOM HOLE SIZE CEM~ RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110' 30" 270 sx Arcticset (Approx.) 10-3/4" 45.5# NT8OLHE 30' 3372' 13-1/2" 1281 sx CS 111/375 sx "G" , ... 7-5/8" 29.7# NT95HS 27' 10659' 9-7/8" 265 sx Class "G" 5-1/2" 17# 13CR80 10491' 11015' 6-3/4" 89 sx Class "G" ... '~4. Pedorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter 3-3/8" 6 spf 4-1/2", 13CR 10493' 10428' MD TVD 10736'-10770' 8950'-8983' 26. AClD, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL 27. PROEXJCTION TEST ~ate First Production IMethod of Operation (Flowing, gas lift,-etc.) 11/14/93 I Gas Lift bate of Test HOurs Tested iPRODUCTIONFOR OIL-BBL ~a,S-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I~ I '~low Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED NOV ;~::~ ~,~a 0il & Gas Cons. Commission Anchorage Form 10-407 Submit in duplicale Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS ' ION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phese. Subsea Sag River 10640' 8776' Shublik 10659' 8794' Top Sadlerochit 10 736' 8869' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~~~ Title Drillin~l_En_oineerSuoervisor Date ~..~_~l~_ ~'~_ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". RECEIVED NOV 0 903 Form 10-407 0ii & Gas Cons. Commission Anchorage BP/AAI SHARED SERVICE WELL: Y-37 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATIONS PAGE: 1 ACCEPT: 10/14/93 04:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 18E WO/C RIG: NABORS 18E 10/14/93 ( 1) TD: 110'( 0) MOVE RIG. MW: 8.5 VIS: 0 MOVE RIG TO Y-37. N/U RISER. MIX SPUD MUD. 10/15/93 (2) TD: 1412'(1302) 10/16/93 (3) TD: 3300'(1888) 10/17/93 (4) TD: 3380'( 80) 10/18/93 (5) TD: 4392' (1012) 10/19/93 (6) TD: 6408'(2016) 10/20/93 (7) TD: 7668'(1260) DRILLING AHEAD MW: 9.1 VIS:350 CONTINUE TO MIX SPUD MUD, FUNCTION TEST DIVERTER, STRAP BHA. MAKE UP BHA, TEST MWD & MOTOR AND CHECK SURFACE SYSTEM. DRILL ICE FROM 72' TO 107'. DRILL FORMATION F/ 107-1041' SHORT TRIP FROM 1041' TO DRILL COLLARS. DRILL AHEAD F/ ~041-1412'. DRILLING AHEAD MW: 9.5 VIS:180 CONTINUE DRILLING F/1412-2038'_ SHORT TRIP 2038' TO 800', HOLE TIGHT ON TRIP BACK IN AT 1725', KELLEYED UP AND WASHED 1725-1765'. DRILL AHEAD F/ 2038-2784'. SHORT TRIP 2784-1600'. DRILL AHEAD F/ 2784-3300'. PREFORM TOP JOB MW: 9.6 VIS:120 DRILL AHEAD F/ 3300-3380'. SHORT TRIP TO HW, SLM, NO PROBLEMS. CIRC AND CONDITION MUD FOR CASING. TRIP OUT OF HOLE FOR CASING, LAY DOWN BHA. RIG UP AND RUN 10 3/4 CASING. CIRC AND CONDITION MUD FOR CEMENT. RIG UP BJ FOR CEMENT JOB. TEST LINES. BACK OUT LANDING JT. AND RIG DOWN FLOOR OF CASING TOOLS. ND 20" DIVERTER SYSTEM AND FLUSH. RIG UP AND PREFORM TOP JOB. DRILLING AHEAD MW: 9.1 VIS: 41 N/U BOPE. TEST BOPE. RIH W/ BHA, BIT. TEST CSG. DRLG FLOAT EQUIP, CMT, 10' NEW HOLE. CBU. FIT (13.2 PPG EMW). DRLG F/ 3390'-4392'. DRILLING AHEAD MW: 9.5 VIS: 40 DRILLING AHEAD F/ 4392-4496' SHORT TRIP TO CASING SHOE @3371'. DRILLING AHEAD F/ 4~96-5498'. SHORT TRIP UP TO 4424'. DRILLING AHEAD F/ F/5498-6408'. TRIP OUT FOR PDC BIT MW: 9.6 VIS: 39 PUMP LO/HI SWEEP, CBU, DROP SURVEY, POH. SWR. MU BHA #3. RIH. WASH 6300-6408'. DRLG 6408-7668'. CBU PRIOR TO POH DUE TO ROP DECREASE. WILL PU PDC BIT AND RIH. REC£[V£D NOV SO igOS Oi~ & Gas Cons. Commissio~ Anchorage WELL : Y-37 OPERATION: RIG : NABORS 18E 10/21/93 (8) TD: 8734'(1066) 10/22/93 (9) TD: 9435' ( 701) 10/23/93 (10) TD: 9975'( 540) 10/24/93 (11) TD:10347' ( 372) 10/25/93 (12) TD:10666' ( 319) 10/26/93 (13) TD:10666' ( 0) 10/27/93 (14) TD:10800' ( 134) 10/28/93 (15) TD:ll015' ( 215) SHORT TRIP MW: 9.7 VIS: 51 PUMP PILL, POH TO PU PDC BIT. SWR. PU BHA ~4. RIH TO 3350, FILL DP. PU KELLY DRIVE BUSHING. RIH. DRLG F/7668-8734'. SHORT TRIP. HOLE BEGAN SWABBING, TIGHT FROM 8400 MD. PU KELLY 8400-8700' IS IN SEABEE SHALE. DRLG MW: 9.7 VIS: 47 PULLED TIGHT/SWABBED AT 8400 MD ON SHORT TRIP. PU KELLY TO WORK TIGHT HOLE. POH TO CHECK/CLEAN PACKED OFF BHA. FREQUENT SWABBING ON WAY OUT. DRLG 8734-9176' CIRC. SHORT TRIP TO 8135'. DRLG 9176-9435'. DRILLING MW: 9.8 VIS: 44 DRLG TO 9777 MD. MINIMAL MUD LOSSES. POH TO SHOE. CHANGE OUT KELLY HOSE. RIH TO 9777. HOLE IN GOOD CONDITION. DRLG 9777-9804' DRILLING MW: 9.8 VIS: 39 DRLG TO 1~0032'. TRACTION MOTOR ON MUD PUMP WENT DOWN. POH. SLM. SWR PU BHA #5. RIH. DRLG 10032-10347' MD. RUNNING 7 5/8" CSG MW: 9.8 VIS: 40 DRLG TO 10666 MD' TOP SAG RIVER. SHORT TRIP TO 9707' TIGHT AND SWABBED 10550 TO 10425'. RIH. CIRC, PUMP ~O/HI SWP, AND CONDITION MUD. POH LD SINGLES TO 7000 MD. POH LD SINGLES. PULL WEAR RING, INSTALL TEST PLUG, CHANGE LOWWER PIPE RAMS TO 7 5/8" TEST DOOR SEALS. RU CASING EQUIP AND RIH 7 5/8" 29.7# NSCC CSG. TEST BOPE. MW: 9.8 VIS: 42 RIH W/ 7-5/8" CSG. CBU. RIH W/ CSG. WASH 20' TO BTM. CIRC. PUMP 50 BBLS MCS4, 54 BBLS 'G' CMT. INSTALL PACKOFF. TEST BOPE. DRILLING MW: 9.4 VIS: 42 TEST BOPE. SWAP OUT KELLY. PU 6 3/4" BHA & RIH. PU 3.5 DP + 5.0 DP TAG FC @10538'. CIRC. DRILL OUT FLOAT EQUIP. CIRC AND CONDITION MUD. DRILLING F/ 10676-10800'. P O H MW: 9.5 VIS: 47 DRILL F/ 10800-11015'. SHORT TRIP TO 7 5/8" SHOE. CIRC AND PUMP HV SWEEP AROUND. DROP EMS SURVEY & PUMP PILL. POH & LD MONELS. RU ATLAS & RUN #1. PU STEELS & RIH TO 2000'. CUT & SLIP DRILLING LINE. RIH TO 11015'. CIRC & COND MUD. POH. RECl iVrr. i) 3 0 Oil & Gas Cons. Commission Anchorage WELL : Y-37 OPERATION: RIG : NABORS 18E PAGE: 3 10/29/93 (16) TD:ll015 PB: 0 10/30/93 (17) TD:ll015 PB:10976 10/31/93 (18) TD:ll015 PB:10976 11/01/93 (19) TD:ll015 PB:10976 RIH. MW: 9.5 WBM POOH. RIH W/ 5-1/2" 13 CR LNR ON DP. CIRC. PUMP 20 BBLS WATER, 70 BBLS BJ SPACER, 18.5 BBLS 'G' CMT. DISP W/ MUD. BUMP PLUG W/ 3000 PSI. SET PKR W/ 4000 PSI. UNSTING F/ LNR. REV CIRC. POOH. RIH W/ CSG SCRAPERS. RUNNING 4 1/2 13 CR TUBING MW: 9.5 WBM RIH W/ 5 1/2" & 7 5/8" SCRAPER. TAG LINER TOP @10491'. CIRC AND CONDTION MUD. TEST 7 5/8" CSG & 5 1/2" LINER W/ MUD. CIRC 2 HOLE VOL. ADD 100 BBLS WATER & DESCO TO REDUCE FLOW. TEST 7 5/8" LAP & 5 1/2 LINER W/ SEA H20. DISPLACED INHIBITED SEAH20, PUMP PILL & BLOW DOWN ON KELLY. POH LAYING 5" & 3 1/2" DP & BHA. SHANGE RAMS TO 4 1/2" & PULL WEAR BUSHING. RU AND RUN 4 1/2" TUBING. RUNNING 4 1/2" CR TUBING MW: 9.5 WBM FOUND BAD NOSE SEAL ON THE THREADS, REPLACED GLM'S ASSY. RUN 4 1/2" 12.6# CR TBG. INSTALL SSSV & TEST CONTROL LINES. RUN 4 1/2" 12.6# CR. TUBING. SPACE OUT TUBING, INSTALL TBG HANGER & TEST CONTROL LINES. CLEAR FLOOR. CHANGE RAMS TO 3 1/2" & NIPPLE DOWN BOPE. RELEASED RIG @ 1800 HRS MW: 9.5 WBM INSTALL ADAPTOR FLANGE, INSTALL & TEST CONTROL LINES. INSTALL XMAS TREE. RU LUBRICATOR PULL 2 WAY CHECK & RD LUBRICATOR. RU & SET BAKER PAKER. DISPLACE TBG W/ 85 BBLS DIESEL & ALLOW TBG TO "U" TUBE. SEP BPV, CLOSE ALL XMAS TREE VALVCES, PUMP CELLAR. RELEASED RIG 1800 HRS 10/31/93. SIGNATURE: (drilling superintendent) DATE: NOV 3 0 1993 Oil & Gas Cons. Commission Anchorage BAKER HUGHES INTEQ MWD SURVEYS 0.00' -10,616' EMS SURVEYS - 10,697' - 11,015' MICROFILMED Date RECEIVED NOV 50 1g~5 , ,~.%,,,., 0[t & G~s Cons. Commission Anchorage BP EXPLORATZON (Alaska) Inc. PAD Y 37 slot fl57 Prudhoe Say North Slope, Alaska SURVEY LISTING by Baker Hughes INTEG Your ref : EHS <10697-11015'> Our ref : svy4107 License : Date printed : 23-Nov-93 Date created : 23-Nov-93 Last revised : 23-Nov-93 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on nTO 16 17.459,w148 49 44.247 Slot location is n?O 16 3.442,w148 49 52.008 Slot Grid coordinates are N 5948825.128, E 544547.132 Slot local coordinates are 1425.Z3 S 256.62 W Reference North is True North EC£ VED BP EXPLORATION (ALaska) Inc. PAD Y,37 Prudhoe Bay, North SLope, Alaska SURVEY LiSTiNG Page I Your ref : EHS <10697-11015'> Last revised : 23-Nov-93 Heasured [nc[in. Azimuth True Vert. R E C T A N G U L A R DogLeg Vert Depth Degrees Degrees Depth C 0 0 R D [ N A T E S Deg/lOOFt Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 126.00 0.90 265.30 125.99 0.08 S 0.99W 0.71 -0.36 224.00 1.00 286.40 223.98 0.10 N 2.57 W 0.37 -1.22 316.00 1.40 282.20 315.96 0.56 N 4.44 ~ 0.44 -2.46 408.00 1.80 281.80 407.92 1.09 N 6.96W 0.43 -4.04 499.00 1.70 241.80 498.89 0.75 N 9.54 W 1.32 -4.87 592.00 1.90 210.10 591.84 1.24 S 11.53 W 1.08 -3.96 685.00 2.70 171.10 684.77 4.74 S 11.97W 1.84 -1.01 778.00 4.20 154.90 777.60 9.98 S 10.18 W 1.91 4.49 872.00 4.20 133.10 871.36 15.45 S 6.21 W 1.69 11.15 966.00 4.30 135.20 965.10 20.30 S 1.21 ~ 0.20 17.70 1060.00 4.00 128.20 1058.85 24.83 S 3.85 E 0.62 23.99 1154.00 4.60 122.90 1152.59 28.91 S 9.59 E 0.76 30.18 1247.00 4.50 124.30 1245.29 32.99 S 15.7'5 E 0.16 36.55 1341.00 4.40 121.90 1339.01 36.97 S 21.84 E 0.22 42.81 1435.00 4.20 135.20 1432.75 41.32 S 27.33 E 1.08 49.13 1528.00 4.30 153.50 1525.50 46.86 S 31.28 E 1.46 55.84 1622.00 4.20 158.80 1619.24 53.22 S 34.10 E 0.43 62.80 1717.00 4.70 162.00 1713.95 60.17 S 36.56 E 0.59 70.11 1807.00 4.70 160.20 1803.65 67.14 S 38.95 E 0.16 77.43 1899.00 5.10 158.40 1895.31 74.49 S 41.75 E 0.46 85.25 1992.00 6.00 163.50 1987.88 82.99 S 44.63 E 1.10 94.17 2086.00 7.50 161.60 2081.22 93.53 S 47.96 E 1.61 105.09 2177.00 9.10 163.00 2171.27 106.04 S 51.94 E 1.77 118.08 2271.00 12.00 158.80 2263.67 122.27 S 57.65 E 3.19 135.16 2364.00 15.10 155.30 2354.07 142.29 S 66.21 E 3.45 156.91 2458.00 17.80 154.60 2444.22 166.40 S 77.49 E 2.88 183.52 2553.00 20.00 155.60 2534.09 194.31 S 90.44 E 2.34 214.29 2648.00 22.90 154.20 2622.50 225.76 S 105.19 E 3.10 249.02 2740.00 26.00 152.80 2706.24 259.82 S 122.21 E 3.43 287.09 2834.00 28.90 155.30 2789.65 298.79 S 141.12 E 3.32 330.40 2928.00 31.40 154.20 2870.93 341.48 S 161.27 E 2.72 377.61 3022.00 33.80 154.60 2950.11 387.15 S 183.15 E 2.56 428.24 3115.00 35.40 152.10 3026.66 434.33 S 206.85 E 2.30 481.04 3208.00 37.30 152.10 3101.56 483.04 S 232.64 E 2.04 536.13 3304.00 40.40 152.50 3176.32 536.35 S 260.63 E 3.24 596.32 3404.00 41.10 150.00 3252.08 593.57 S 292.03 E 1.78 661.51 3487.00 40.70 150.40 3314.82 640.72 S 319.03 E 0.58 715.74 3580.00 40.40 151.10 3385.48 693.48 S 348.58 E 0.59 776.11 3675.00 40.10 151.10 3457.99 747.21 S 378.24 E 0.32 837.42 3768.00 39.60 150.00 3529.39 799.10 S 407.54 E 0.93 896.91 3862.00 39.00 153.20 3602.14 851.46 S 435.86E 2.25 956.38 3956.00 40.70 153.90 3674.30 905.38 S 462.68 E 1.87 1016.61 4049.00 40.30 153.20 3745.02 959.46 S 489.58 E 0.65 1077.00 4141.00 40.10 152.80 3815.29 1012.37 S 516.54 E 0.35 1136.38 4236.00 39.90 152.80 3~.~8.06 1066.68 S 544.45 E 0.21 119T.43 4330.00 39.80 152.80 3960.23 1120.26 S 571.98 E 0.11 1257.65 4423.00 41.00 154.60 4031.05 1174.29 S 598.68 E 1.80 1317.92 4517.00 40.30 154.60 4102.37 1229.61 S 624.94 E 0.74 1379.15 4612.00 40.20 154.20 4174.88 1284.96 S 651.46 E 0.29 1440.53 RECEIVED NOV 3 0 :'~.~?~:,,,a Oil & ¢~s Cons. Commission Anchora~o Att data is in feet unless otherwise stated Coordinates from slot #37 and TVD from weLLhead (80.90 Ft above mean sea LeveL). Vertical section is from weLLhead on azimuth 153.91 degrees. DecLination is 0.00 degreesw Convergence is 1.10 degrees. CalcuLation uses the minimum curvature method. Presented by Baker Hughes iNTEQ Measured Depth 4704.00 4798.00 4892.00 4985.00 5079.00 5172.00 5268.00 5362.00 5455.00 5550.00 5645.00 5739.00 5834.00 5927.00 6020.00 BP EXPLORATION (Alaska) Inc. PAD Y,37 Prudhoe Bay, North Slope, Alaska SURVEY LISTING Page 2 Your ref : EMS <10697-11015'> Last revised : 23-Nov-93 [nc[in. Azimuth True Vert. R E C T A N G U L A Degrees Degrees Depth C 0 0 R D ! N A T E 39.90 154.60 4245.30 1338.35 S 677.04 39.80 154.90 4317.47 1392.83 S 702.74 40.00 156.30 4389.58 1447.73 S 727.64 42.80 156.00 4459.34 1503.98 S ~52.51 42.10 156.00 4528.70 1561.94 S 778.32 R Dogleg Vert S Deg/lOOFt Sect E 0.43 149~.73 E 0.23 1559.95 E 0.98 1620.22 E 3.02 1681.67 E 0.74 1745.07 41.80 156.00 4597.86 1618.73 S 803.60 E 0.32 1807.20 43.10 156.00 4668.70 1677.92 S 829.96 E 1.35 1871.95 42.70 156.00 47'57.56 1736.38 S 855.98 E 0.42 1935.90 43.50 156.00 4805.46 1794.43 S 881.83 E 0.86 1999.40 44.10 156.30 4874.03 1854.57 S 908.41 E 0.67 2065.10 44.00 156.00 4942.31 1914.98 S 935.12 E 0.24 2131.10 43.80 156.30 5010.04 1974.59 S 961.48 E 0.31 2196.23 44.40 157.00 5078.26 2035.29 S 987.68 E 0.81 2262.26 44.70 156.30 5144.54 2095.19 S 1013.54 E 0.62 2327.43 44.20 156.70 5210.92 2154.91 S 1039.51 E 0.62 2392.49 6115.00 43.60 155.30 5279.38 2215.09 S 1066.29 E 1.20 2458.32 6208.00 43.60 155.30 5346.73 2273.36 S 1093.09 E 0.00 2522.43 6303.00 45.30 154.90 5414.54 2333.69 S 1121.11 E 1.81 2588.94 6397.00 45.30 156.70 5480.66 2394.63 S 1148.49 E 1.36 2655.72 6492.00 45.60 154.20 5547.31 2456.20 S 1176.62 E 1.90 2723.38 6586.00 44.90 154.60 5613.49 2516.40 S 1205.47 E 0.80 2790.14 6680.00 44.30 155.30 5680.42 2576.20 S 1233.41 E 0.82 2856.13 6775.00 44.70 154.20 5748.18 2636.42 S 1261.82 E 0.91 2922.70 6870.00 45.00 153.50 5815.53 2696.56 S 1291.35 E 0.61 2989.70 6964.00 44.60 153.50 5882.23 2755.83 S 1320.90 E 0.42 3055.94 7059.00 7153.00 7249.00 7344.00 7438.00 7532.00 7626.00 7720.00 7813.00 7908.00 8000.00 8092.00 8188.00 8283.00 8378.00 42.80 152.50 5950.91 2814.32 S 1350.69 E 2.03 3121.56 42.80 152.50 6019.88 2870.97 S 1380.18 E 0.00 3185.41 42.90 152.10 6090.26 2928.77 S 1410.53 E 0.30 3250.67 42.90 151.80 6159.86 2985.84 S 1440.94 E 0.21 3315.30 42.70 151.10 6228.83 3041.94 S 1471.46 E 0.55 3379.11 42.70 151.40 6297.91 3097.83 S 1502.12 E 0.22 3442.78 42.50 151.80 6367.10 3153.80 S 1532.38 E 0.36 3506.36 42.40 151.10 6436.46 3209.53 S 1562.71 E 0.51 3569.74 41.60 151.10 6505.57 3264.01 S 1592.78 E 0.86 3631.90 41.10 152.50 6576.89 3319.32 S 1622.44 E 1.11 3694.61 40.70 152.80 6646.43 3372.82 S 1650.11 E 0.48 3754.84 40.40 152.10 6716.33 3425.85 S 1677.78 E 0.59 3814.62 40.20 151.80 6789.55 3480.65 S 1706.97 E 0.29 3876.68 39.90 151.80 6862.27 3534.52 S 17'55.86 E 0.32 3937.77 39.70 151.80 6935.26 3588.11 S 1764.60 E 0.21 3998.54 8472.00 39.50 152.80 7007.69 3641.16 S 1792.45 E 0.71 4058.43 8566.00 39.00 152.10 7080.48 3693.89 S 1819.96 E 0.71 4117.88 8661.00 38.70 152.50 7154.46 3746.65 S 1847.66 E 0.41 4177.45 8756.00 37.60 153.20 7229.17 3798.87 S 1874.44 E 1.24 4236.12 · 8850.00 38.50 153.90 7303.19 3850.74 S 1900.24 E 1.06 4294.06 8945.00 38.10 154.20 7377.75 3903.68 S 1926.00 E 0.46 4352.94 9040.00 37.80 153.50 7452.66 3956.12 S 1951.75 E 0.55 4411.36 9135.00 37.20 154.20 7528.03 4008.03 S 1977.24 E 0.77 4469.19 9229.00 36.70 153.90 7603.15 4058.84 S 2001.97 E 0.56 4525.69 9323.00 36.00 153.20 7678.86 4108.72 S 2026.78 E 0.86 4581.41 RECEIVED NOV 3 0 199,3 ~,:~ .... ~ Oil & Gas Cons. Commission Anchorage Att data is in feet unless otherwise stated Coordinates from slot #37 and TVD from wellhead (80.90 Ft above mean sea level). Vertical section is from wellhead on azimuth 155.91 degrees. Declination is 0.00 degrees, Convergence iS 1.10 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes iNTEQ Measured Depth BP EXPLORAT[ON (Ataska) ]nc. PAD Y,37 Prudhoe Bay, North Stope, Ataska [nctin. Azimuth True Vert. Degrees Degrees Depth 9418.00 34.90 153.90 7756.25 9513.00 33.50 153.50 7834.82 9606.00 32.20 154.90 7912.94 9699.00 30.60 154.60 7992.32 9794.00 29.10 156.00 8074.72 9888.00 27.70 155.60 8157.40 9982.00 26.40 153.90 8241.12 10077.00 24.30 156.30 8326.97 10169.00 21.90 157.70 8411.59 10265.00 20.50 158.10 8501.09 10360.00 19.40 157.40 8590.39 10454.00 18.30 158.80 8679.34 10549.00 17.30 159.50 8769.80 10616.00 17.00 161.60 8833.82 10697.00 16.19 164.56 8911.44 10758.00 15.04 165.11 8970.19 10849.00 14.57 165.23 9058.17- 10941.00 13.97 164.54 9147.33 10971.00 13.78 165.03 9176.46 11015.00 13.78 165.03 9219.19 SURVEY LISTING Page 3 Your ref : EMS <10697-11015'> Last revised : 23-Nov-93 R E C T A N G U L A R Dogleg Vert C 0 0 R D I N A T E S Deg/lOOFt Sect 4i58.05 S 2051.33 E 1.23 4636.50 4205.92 S 2074.98 E 1.49 4689.90 4251.33 S 2096.94 E 1.62 4740.34 4295.16 S 2117.61 E 1.73 4788.79 4338.11 S 2137.38 E 1.74 4836.06 4378.89 S 2155.70 E 1.50 4880.74 4417.55 S 2173.92 E 1.61 49?.3.48 4454.42 S 2191.07 E 2.46 4964.13 4487.63 S 2205.20 E 2.68 5000.17 4519.80 S 2218.26 E 1.47 5034.80 4549.80 S 2230.53 E 1.18 4577.97 S 2241.86 E 1.26 4605.11 S 2252.20 E 1.08 4623.73 S 2258.78 E 1.03 4645.86 S 2265.53 E 1.44 5067.14 5097.43 5126.35 5145.97 Tie-On fr/ TELECO MWO for EMS 5168.80 4661.70 S 2269.83 E 1.90 4684.18 S 2275.78 E 0.52 4706.07 S 2281.69 E 0.68 4713.01 S 2283.58 E 0.74 4723.14 S 2286.28 E 0.00 5184.92 5207.73 5229.99 5237.06 5247.34 Projected Data - NO SURVEY RECEIVED Oil & ~as Cons. Commission Anchorage All data is in feet unless otherwise stated Coordinates from slot #37 and TVD from wellhead (80.90 Ft above mean sea [eve[). Vertical section is from wellhead on azimuth 153.91 degrees. Declination is 0.00 degreesl Convergence is 1.10 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATZOH (A(aska) Znc. SURVEY LZSTZHG Page 4 PAD Y,37 Your ref = ENS <10697-11015'> Prudhoe Bay, North Stope, Ataska Last revised = 23-Nov-93 Comments in we[[path ND TVD Rectangular Coords. Comment 10616.00 8833.82 4623.7'5 S 2258.78 E Tie-On fr/ TELECO HI40 for EHS 11015.00 9219.19 4723.14 S 2286.28 E Projected Data - NO SURVE~ RECEIVED NOV $0 199,~ Alaska Oil & Gas Cons. Commission Anchorage At[ data is in feet untess otherwise stated Coordinates from stot #37 and TVD from wet[head (80.90 Ft above mean sea [eve[). Bottom hole distance is 5247.39 on azimuth 154.17 degrees from we[[head. Vertical sect.ion is from we[[head on azimuth 153.91 degrees. Dectination is 0.00 degrees~ Convergence is 1.10 degrees. Catcu[ation uses the minimum curvature method. Presented by Baker Hughes INTEO PERMIT DATA 93-136 BHC/AC/GR 93-136 DIFL/SP/GR 93-136 GR/CCL 93-136 PFC/CCL 93-136 PFC/CCL 93-136 SBT/GR/CCL 93-136 SSTVD 93-136 407 93-136 DAILY WELL OP 93-136 SURVEY 93-136 5875 AOGCC Individual Well Geological Materials Inventory DATA_PLUS 10054-10956, 2&5" 10630-10985, 2&5" 10260-10877 10260-10877 10620-10864 10170-10882 10054-10985, 1&2"MD COMP DATE: 11/10/93 10/14/93-11/01/93 0.00-10616 10054-10985, OH/LWD Page: Date: DATE_RECVD · 11/02/1993 11/02/1993 11/16/1993 11/16/1993 11/16/1993 11/16/1993 11/02/1993 11/30/1993 11/30/1993 11/30/1993 11/04/1993 1 11/30/93 Are Was the If yes, Are dry ditch samples Well is in compliance Comments well tests required? yes no well cored? yes no was the core analysis and description received? yes a requirement? yes no Received? no yes no This is to acknowled~gOeceipt of the following P2nts and negatives. COMPANY: STATE OF ALASKA-0IL & GAS CONSERVATION COMMISSION ATTENTION: LARRY GRANT FIELD: PRUDHOE BAY & ENDICOTT WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA Q-03 PLSCLEAK ~~) 5~, 1%~- e~7 1 K-OS PLS L~aK DET~T 5" ~ 3 ~O 1 Y-37 SBT-GR- CCL 5" ;0~J ~0~ 1 -37 PFC/CCL (PERFJ _ 37 PFC/CCh ~PERF) 5" 1 1 SIGNED __ DATE \ Please return one copy of signed transmittal to each of the following: Atlas Wireline Services Pouch 340013 Prudhoe Bay, AK 99734 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 FT~RTNCARD1 ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 2 November 1993 RE: Transmittal of Data ECC #: 6075.00 Data: OH-LDWG Dear Sir/Madam, 'Reference: BP Y-37 (21-3-10-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: Sent by U.S. MAIL d~ DIFL LDWG TAPE+LIST Run $ 1 '~ ~7~ I c~o~ ~0~?~5~ Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Date: This is to acknowled~receipt of the following ~nts and negatives. COMPANY: STATE OF ALASKA ATTENT I ON: LARRY GRANT FIELD: PRUDHOE BAY WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA ~5_~7 N-04 A CN/GR g,, q~0Q _~1 I0~9~ 0 1 ~.~j~ N-16 CN/GR ~, ~50 .~1 100~ 0 1 0- 1 , , ** Could you please let us ~ow your distribution for the SS ~ log Thank you Jennifer Dietz , , . Please return n copy of signed transmittal to each of the following: Atlas Wireline Services Pouch 340013 Prudhoe Bay, AK 99734 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 FT\RTNCARD1 MEMoRANDt TO: David John~~ Chairman-"" THRU: Blair Wondzell, P. I. Supervisor- FROM: Doug Amos, Petroleum Inspector State o laska Alaska Oil and Gas Conservation Commission DATE: October 17, 1993 NO: ainhjqad.doc '~, SUBJECT: BOPE Test Nabors 18E BPX PBUY- 37 Prudhoe 011 Pool Sunday October 17,. 1993: I traveled to BPX PBU Y- 37 to witness the BOPE test on Nabors Rig No. 18E. There were two failures, the Upper Kelly Cock and Choke Manifold Valve No. 8. Both failures were repaired before drilling, out the 10 3/4" Casing Shoe. As the attached AOGCC BOPE Test Report indicatesttest time was 3.0 hours, I found the rig in good condition and all BOP equipment functioning and in good repair. Summary.: I witnessed the BOPE test at BPX PBU Y-37 on Nabors 18E, 3.0 test hours, 2 failures, 25 valves tested. . Attachment AINHJQAD.XLS STACK-:- f ~Rams C~ V~ 0 FLOOR'SAFETY VALVES: ~ 'Kelly ~ Kelly t IBOP Ball Type Teat Oran. Pressure fI f,,,! '~/~ ,,, ~ i ~/~ ...... PIF Trip Tank ~ ~ - ltl. , IIIIII I I I ~;'~! i Test Pressure P/F · f_4.1 ~./~' .I e t3~ ! ~ min~ ',~-sec., minutes ~t sec. ~~:FaaUms: . 2.i .... .:...Test T'eae: 3,0 HOam. N~ of valves tested ~ ~ or ReplaCement of Faaed" b AOGCC Commission ~e ~:: Fax N ~542 ~ ~ ~ P~O~ No. 659-3607 m' 3687 Ifyour(;llisn~~by~~witldn l-2::~-~-~~eP.l.~~ 27t-1433 ..................... ' ....... '' ''' ' ............... ': ...................... I II II IIIIIIIIII II iii IIIlll ii iiii i[ iii ii ii1[111 i Iiiii c- Tdp~~ YES .... X.. -NO i i i i i~ ii . , 24H~: NOTICE,GIV~ I YES', X NO: . i I I / i I :::: ............... I I III I II I ir ar I - ':_ I II, ..1. '" ': ". II FI. O2tL (Rev, 7~) LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 13 October 1994 Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL D-28 DESCRIPTION 1 PL/STP-'FINAL BL ' i PL/STP FINL.RF SEPIA i PLS FINAL BL i PLS FINAL RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PL/STATIC FINAL BL I PL/STATIC RF SEPIA 1 PLS/STP FINAL BL 1 PLS/STP RF SEPIA i PLS FINAL BL i PLS FINAL RF SEPIA Run # i Run # 1 Run # 1 Run # i Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # i Run # 1 Run # I ea ' s' a re · as ' ' ervices ECC No. 4529.03 4911.04 5157.06 5761.05 6022.03 6075.06 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received Date .............. LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ t.~.~~-28 (32-30-11-14) ' DESCRIPTION PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA CCL/TUBCUTR.FINAL BL CCL/TUBCUTR RF SEPIA Date: 23 September 1994 RE: ~ Transmittal of Data Sent by: U.S. MAIL ECC No. Run $ 1 1590.02 Run # 1 Run ~ 1 5812.03 Run ~ 1 Run # 1 5953.05 Run # 1 Run # 1 6047.01 Run # 1 Run ~ 1 6075.05 Run # 1 Run ~ 1 6162.03 Run ~ 1 Run ~ 1 6271.00 Run # 1 Run $ 1 6273.00 Run ~ 1 RECEIVED OCi 0 5 1994 : Atlas Wireline S; Please sign and return to ~600 B~ Anch~A~f~ge ,. AKa99518 Received b~ Allskl 011 & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COM~IISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, AI.A~KA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 278-7542 September 15, 1993 Terry Jordan Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit Y-37 BP Exploration (Alaska), Inc. Permit No. 93-136 Sur. Loc. 3854'NSL 276 WEL, Sec. 33, TllN, R13E, UM Btmnhole Loc.. 4406'NSL, 3251'WEL, Sec. 03, T10N, R13~, UM Dear Mr. Jordan: EnClosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. ~hnston~ Chairman BY ORDER OF THE CO~MI$$ION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~;) printed on recycled paper b y C~ r~. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. TyPe of work Drill [] RedrillEillb. TyPe of'w~il. EXPlo~a'to~yl-I Stratigraphic Test r-I Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool .. BP Exploration KBE , 79.4 feet Prudhoe Bay Field/Prudhoe 3. Address ' 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 47471 4. Location of well at surfaCe 7. Unit or property Name 11. Type Bond(=ee 20 AAC 25.025) 3854' NSL, 276' WEL, SEC. 33, T11N, R13E Prudhoe Bay Unit . At top of productive interval 8. Well number Number 4460' NSL, 3278' WEL, SEC. 03, TION, R13E Y.37 (21.3-10-13) 2S100302630-277 , At total depth 9. Approximate spUd date Amount 4406' NSL, 3251' WEL, SEC. 03, TlON, R13E 10/10/93 $200,000.00 12. Distance to nearest 13. DiStance to nearest well !14. NUmber of acres in property 15. Proposed depth (MD and TVD) property line ADL 28287-877' feet Y- 11/Y-21 @ Surface-35' feet 2560 11044'MD/9214' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (aec 2o AAC 2S.03S (e)(2)) Kickoff depth ~Teo' feet Maxi~u..m .ho!e an~lle 4~ 0 Maximum cud,ce 3330 pslg At total depth (TVD) 8800'/~90 pslg 18. Casing program " Setting Depth s~ze Specifications Top Bottom Quantity of cement , , Hole Casing Weight Grade CouPling Length M D TVD M D TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 27.0 sx Arcticset (Approx.) .... 13-1/2" 10.3./4" 45.5# NT~O~-H~. .Butt 3413' 2.9' 29' 3442' 3270' 1304 ~x CS llJ~,$ sx "G"/25o sx C, S II 9-7/81' 7-5/8" 29.7# NT~SHS NSCC . 10654' .28' 28' 1,0686' 8868' 265 sx Class "G" 6-3/4" 5-1/2" 17# t3CR8O NSCC 608' 10440' 8692' 11044' 9214' 90 sx Class "G" 19. To be completed for Redrili, Re'-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Structural Length Size Cemented J~T~I~ E r~ True Vertical depth Conductor Surface S E P - 9 199; Intermediate Production ~la$..J.~ 0il & Gas Cons. Commission Liner Perforation depth: measured true vertical 20. Attachments Filing fee [] 'PropertY plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program E! Time vs depth, pict [] Refraction analysis• Seabed report[] 20 AAC 25.050 requirementsl"l 21. I hereby codify ~that thee foregoing is true and correct to the best of mY"k~owledge Signed ~'/~14/'~'J~ . Title Drilling Engineer Supervisor ~'- ~-4 $ Date l {..~/ Commission Use Only Permit Number ' ' IAPI number IApproval date _ See cover letter ~'3"/,.~ 150- (:3~_ ?.- Z2.. ~'~,,~ I ~ ~/,.~'"~-/--~ for other requirements Conditions of approval Samples required [] Yes J~ No Mud Icg required [] Yes ~ No Hydrogen sulfide measures [] Yes ,J~ No Directional survey required '~ Yes [] No Required working pressure for BOPE 1-12M; 1-13M; 1~5M; I-I10M; !-115M; Other: by order of Approved by Original Signed By Commissioner ,ne commission Date~//~'/~ , , I'-, , ! & ,~l t ! ,, , :Orm 10-401 Rev. 12-1-8~avid W, Johnston Submit i~ cate I WellName: IY-37 PBU Well Plan Summary I Type of Well (producer or injector): ] Producer ISurface Location: Target Location: Bottom Hole Location: 3854, FSL 276' FEL Sec 33 T1 IN R13E UM 4460' FSL 3278' FEL Sec 03 TI'0N R13E UM 4406' FSL 3251' FEL Sec 03 T10N R13E UM I AFE Number: 14P0519 I ]Rig: ]Nabors 18-E I Estimated Start Date: I Oct 10 1993' I Operating days to complete: 1 22 I MD: 1'11044' I I TVO: 19214' '1 IKBE: 179.4. I Well Design (conventional, slimhole, etc.): [ Slimhole producer Formation Markers: Formation ToPs ' MD TVD (BKB) Ugnu Zone 4A 4554' 4106' W. Sak Sands Top Seabee 6950' 5888' Kuparuk/Put River Absent IKRU/LCU 9405' 7726' Top Sag River 10686' . 8868' Top Shublik 10706' 88'87' Top Sadlerochit 10781' 8959' Target 10809' 8986' - '" Total Depth 11044' 9'214' ' $ EP - 9 199~ , ..... '"' '~. ~,/~tl I IilllOOlt , Casin: /Tubinram: Hole'Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. . MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' 30'/30' 1107110' 13 1/2" 10 3/4" 45.5# NTSOHLE Butt 3413' 29'/29' 3442'/3270' 9 7/8" 7 5/8" 29.7# NT95HS NSCC 10654' 28'/28' 10686'/8868' 6 3/4" 5 1/2" 17# 13Cr-80 NSCC 608' 1044078692' ~ 11044'/9214' 4 1/2" 12.6 13Cr-80 NSCT 10412' 27'/27' 10445'/8870' Well Plan Summary Page 1 Logging Prog I OPen Hole Logs: 13 1/2" Hole 9 7/8" Hole 6 3/4" Hole I Cased Hole Logs: 7 5/8" Casing 5 1/2" Liner ram: None None GR/DIL/BHCS None SBT. Mud Program: [Special design considerations I None Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point . gel . ]lei Loss 8.5 100 20 15 20 9 15 , ,, tO tO tO tO tO tO tO 9.5 300 60 60 80 10 25 Intermediate Mud Properties: . I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 35 10 5 10 9.5 5 , to to to t° to to to 10.2 50 ' i5 10 20 10 10 Production MUd prOperties: Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity . Point gel gel Loss '9.6 30 8 3 7 8 6 i , , tO tO tO tO tO tO tO 10.0 45 13 10 15 9 8 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. D Directional'. IgOP: I 1700' I MaXimum H°le Angle: ] 42 degrees Close Approach Well: Y-11, Y-21 at surface (35' away) The above listed wells will be secured during the close approach. S E P - 9 199;~ ,Alaska Oil & Gas Cons. Commission ] ,]Anchorage Well Plan Summary Page 2 PROPOSED DRILLING ,~AND COMPLETION PROGRAM WELL Y-37 r03-10-131 PBU MIRU. NU diverter and function test same.. Drill 13-1/2" hole to 3442' MD BKB. Run and cement 10-3/4", 45.5#, L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. A formation leak-off test will be performed 10' below the 10-3/4" shoe. Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag River. Run a 7-5/8",' 29.7 # NSCC casing string to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected with dead crude oil. Directionally drill the 6-3/4" hole to TD. Run 5-1/2" liner from TD to 150' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" 'float equipment. Change over to NaCl completion fluid. Test casing and lap to 3500 psi. Run 7-5/8" productiOn packer on the 4-1/2" tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Freeze protect the tubing and annulus with Diesel from surface to 2100' TVDBKB. Set and test packer. The well will be perforated after the rig has been released. Fluids incidental to the drilling of a well will be injected to CC-2A. Tubing Size: 4-1/2", 12.6 # NT13CR-80 tubing with 6 GLM's. R'£ EiVED S E p .. 9 ~99~ Aia;~.Oil.& Gas Cons, Commission I ........ pnuDHO[ ILL ..... · ! ! .... i .- ii [ II . I!.- I I iii ii i i i ,, i i ii i I i A)MarkerKB Identification MDo BKB ,~ ~op ,o~,o ~.~o/~oo ,~oo ~zoo o o.oo VERTICAL SECTZON VIEW ~) KOp DROP ~.50/]00 E) ENO O~ $,50 DROP 10809 8986 5203 15.00 Sec. t~on at: ~53.g~ F] IARGET 10809 8986 5203 i5.00 TVD Scale · ~ inch = 1200 feet <KB> ~ TO ~104a g2mJ4 5264 1}.O0 Dep Scale,' I inch - 1200 feet ~ ~ ~ Drawn '09/02/93 BO0- - ' ....... ~ ..... ' j 8rear, Land, Directional,,, _ Drilling 1200 ~ ' .......... . 18oo- ~: _ ~ _ _ -' ........ 2400 ' ~ ...... ., B 3000 ........ : ........... , B 3~oo ......... I ' dS00 .......... . .... 5~00 ....... ~ ............... ~ooo ~a~ ~-~- ~ . ' ........ S~ P ~ 9~ 199~ 6600 Al taka Oi~ Gas Co~s. Comn ,ission Anchorage 7200 .... 9600 ' ' ' ~ ~. m m mil 0 BO0 1200 1800 2400 3000 3600 4200 4800 5400 BO00 6800 7200 7800 Section Departure i i PRUDHO.E B DR ILL ING Marker Identification MO N/$ A) KB 0 0 B) KOP BUILD 2.50/100 2700 0 C) END OF 2.50 BUILD 3378 528 D) KOP DROP t.50/100 90U 3910 E) END OF t,50 DROP 10809 .4673 F) TARGET 10809 4673 G) TO 1J044 4728 H) Planning Tsrgct 10809 4673 E/W 1915 ~88 ~3~5 ~88 ii, _ iiii -_ ii ii Y-37 (Pl) PLAN VIEN CLOSURE · 5264 feet 8t AZimuth ~53.9! DECLINATION · 29.775 E SCALE · 1 inch = ~000 feet !DRAWN · 09/02/93 iii i Great LanE/DJrectJonaJ Drilling ' I ' : SE ~ - 9 1993 ......i i .............. ~.Ofl:, & ~ mchorao~3a~q cnn~_ Cnmmi.~ sion 500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 5500 TOTAL P. O6 10-3/4" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE' 10-3/4" CIRC. TEMP 38°F SPACER: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: ColdSet III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX #SACKS: 1304 YIELD:1.92 ft3/sx MIX WATER: 10.5 gps THICKENING TIME: Greater than 4 hrs @ 50°F TAIL CEMENT TYPE: Class G ADDITIVES: 2% A-7 +1 ghs FP-6L. WEIGHT: 15.8 ppg YIELD:I. 15 ft3/sx MIX WATER: 4.95 gps APPROX #SACKS: 355 THICKENING TIME: Greater than 3 1/2 hrs @ 50°F TOP JOB CEMENT TYPE' Coldset II ADDITIVES: retarder WEIGHT: 14.9 ppg APPROX #SACKS: 250 YIELD:0.96 ft3/sx MIX WATER: 3.89 gps CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 25 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME' 1. Lead slurry from TD to sudace w/100% excess. 2. Tail slurry volume 355 sx (to cover 500' of casing shoe w/100% excess) 3. Top job volume 250 sx. RECEIVED S EP - 9 199;] ltlae.lga.Oii & Gas Cons. Commission Anchorage 7-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ SERVICES CIRC. TEMP: 140o F SPACER: 50 bbls Arco preflush+1%S-400, weighted I ppg above current mud weight. CEMENT TYPE: CLASS G ADDITIVES: 0.3%FL-52+0.5%CD-32+0.1%A-2+1GHS FP-6L WEIGHT: 15.8ppg APPROX #SACKS: 265 FLUID LOSS: 100-150 cc YIELD: 1.14ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3 1/2 -4 1/2 hrs FREE WATER: 0 CENTRALIZER PLACEMENT: 1 Turbulator centralizer per joint on the bottom 500' of 7- 5/8" casing ( 12 required ). One solid body 7-3/4" x 9-1/4" centralizer or turbolator on first 2 joints inside 10-3/4" surface casing shoe. OTHER CONSIDERATIONS: Pedorm lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix slurry on the fly - batch mixino is not necessary. CEMENT VOLUME: 1. Slurry to 1000' md above casing point with 30% excess. 2. 80' md 7-5/8", 29.7# capacity for float joints. NOTE: No hydrocarbon bearing zones are identified in the Cretaceous interval. R'E .EIVED S E P - 9 1993 AJa$.J~a 0JJ :& Gas Cons. Commission Anchorage 5-1/2" PRODUCTION LINER CEMENT PROGRAM - BJ SERVICES CIRC. TEMP 140° F BHST 220 deg F at 8800' TVDSS. PREFLUSH' 20 bbls Arco Alpha Preflush (unweighted) SPACER' 75 bbls ARCO Alpha Spacer mixed as per BJ specifications weighted 1.0 ppg above mud weight. CEMENT TYPE: CLASS G ADDITIVES: 150ghs BA-86L+0.6% CD-32 + 0.2% FL-33 + 0.2% A-2 + 0.5% Bentonite + 2ghs FP-10L WEIGHT: 15.7 ppg YIELD:1.17 ft3/sx MIX WATER: 3.58 gps APPROX #SACKS: 90 THICKENING TIME: 45 min @ surface + 3 to 4 hrs at 140°F FLUID LOSS: Less than 50cc FREE WATER: 0 mi at 45° angle Note: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencys ( if any ) of slurry when consistometer is re-started after shutdown period - additional retarder may be required - consult w/cementer. CENTRALIZER PLACEMENT: Run 2 right hand turbolators per joint in open hole, 1 per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50cc or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME' I . , Open hole (6-3/4" X 5-1/2") + 30% excess (adjust if a caliper log is run and it indicates severe washouts). 5-1/2", 17# casing capacity below landing collar. 250' liner lap (6.750" x 5-1/2") 200' of cement on top of the liner in the 7-5/8" casing. RI] EIV£D SEP - 9 199 Alas~ ~0il & Gas Cons. C0mmiss~On ~Anohorage ITEM (1) Fee (2) Loc .... CHECK LIST FOR NEW WELL PERMITS APPROVE 8~ [10 8 15] [14 thru 22 [23 thru (5) BOPE (6) Other /~C ~ [29 thru [32] (8) Addl geology: eng i neet i ng' DWd~ M~ PAD R~TABJ~I~ qJ,~ !'~ rev 6/93 3o/6.011 5 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 31. 32. 33. Company ~P ~--~'~'~m ~.~/~j~) Lease g Well ~~ ~ z/~? . /0~ [ YES NO REMARKS Is pemit fee attached ............................................... ~ .... Is well to be located in a defined pool .............................. ~ , ...... Is well located proper distance from property line ................... , .... Is well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. ~_ Is well to be deviated g is wellbore plat included ................... Is operator the only affected party .......................... ........ Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... i order needed ' Is a conservat on ....................................... Is ac~ninistrative approval needed .................................... Is lease ncrnber appropriate .......................................... Does well have a unique name & ncrnber ................................ L is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cen~nt used to circulate on conductor g surface ............ Will cement tie in surface g intermediate or production strings ...... W111 cement cover all known productive horizons ..................... W111 all casing give adequate safety in collapSe~ tension~ and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandorment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a dlverter system required ........................................ Is drilling fluid program schematic g list of equipment adequate ..... Are necessary diagrams & descriptions of dlverter 8 BOPE attached .... Does BOPE-have sufficient pressure rating -- test to ~-~> ps ig ..... Does choke manifold comply w/APl RP-5~ (May 84) ...................... Is presence of H2S gas.probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potentlal ove.rpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc~ are survey results of seabed conditions presented... Name and phone nLmber of contact to supply weekly progress data ...... Additional requirements INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' MERIDIAN: UM WELL TYPE' Exp/Dev, Inj ..... SM Red r i 11 Rev 0 --t Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to · simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been fnade to chronologically organize this category of information. Y-37 PRUDHOE BAY MICROFILMED Run 1' 27 - October - 1993 DIFL/ACIGR 00G4 0986 Tape Subfile 2 is type: LIS T~E HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: ~I NUMBER: OPEP~TOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6075.00 BRAD ESARY SEE REMARKS REMARAiS: Y- 37 (21-03-10-13) 500292240300 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 01-NOV- 93 OPEN HOLE RUN 2 RUN 3 3854 276 DIFL/AC/GR LOGS WITNESSED BY: M. FERNANDEZ & H. HAYWOOD. CIRCULATION STOPPED @ 12:00, 27-OCT-93. GAMMA RAY LOGGED FROM CASING POINT TO 10054'. AC CYCLE SKIPPING NOTED BELOW CASING POINT AT 10630' - 10648', POSSIBLY DUE TO WASHOUT. $ 7.625 10659.0 6.750 11015.0 CASING DRILLERS BIT SIZE (IN) SIZE (IN)DEPTH (FT) 33 11N 13E 80.90 79.40 49.90 FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR BCS DIL $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA 0.5000 START DEPTH STOP DEPTH 10630.0 10938.0 10630.0 10956.0 10630.0 10985.0 GR (MEASURED DEPTH) BASELINE DEPTH 10630.0 10633.0 10656.0 10658.5 10658.5 10659.0 10658.5 10659.5 10658.5 10665.5 10665.0 10664.5 10669.5 10669.5 10669.5 10668.5 10678.0 10677.0 10678.5 10677.0 10680.5 10680.0 10682.0 10681.5 10685.5 10686.5 10685.5 10689.0 10689.0 10690.0 10689.0 10691.0 10691.5 10702.0 10703.5 10702.5 10708.5 10709.0 10707.5 10713.0 10711.0 10717.0 10715.0 10720.5 10719.5 10719.0 10724.0 10724.0 10724.5 10725.0 10724.0 10726.0 10726.0 10730.5 10730.0 10731.0 10731.5 10734.0 10733.0 10735.0 10738.0 10738.0 10738.0 10737.5 10743.5 10749.0 10749.0 10748.5 10749.5 10748.5 10765.5 10766.0 10765.0 10765.0 10779.0 10779.0 10779.0 10780.5 10780.5 10795.5 10796.0 10797.5 10798.0 10816.0 10816.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... DT LL8 ILM ILD 10630.0 10630.0 10630.0 10630.0 10633.5 10654.5 10654.5 10658.5 10665.0 10669.5 10677.0 10680.0 10686.5 10689.0 10700.5 10703.0 10706.5 10719.5 10723.5 10734.0 10738.0 10742.5 10748.5 10765.0 10779.0 10816.0 no case 10822.0 10828.0 10828.5 10849,5 10850.0 10854.0 10854.5 10858.0 10869.0 10876.0 10877.0 10878.5 10890.5 10902.5 10904.5 10907.5 10911.0 10929.0 10965.0 10995.0 $ MERGED DATA SOURCE PBU TOOL CODE GR BCS DIL $ REMARKS: 10850.0 10858.0 10870.0 10877.0 10891.0 10902.5 10905.0 10822.0 10822.0 10827.0 10828.5 10828.5 10849.5 10849.0 10849.5 10853.5 10854.5 10854.5 10876.0 10876.0 10876.0 10878.0 10890.5 10890.5 10890.5 10902.5 10902.5 10902.5 10908.0 10908.0 10908.0 10911.5 10911.0 10911.0 10911.0 10929.0 10929.0 10928.5 10929.0 10964.5 10995.0 10995.0 10995.0 10995.0 RUN NO. PASS NO. MERGE TOP i 2 10630.0 i 2 10630.0 i 2 10630.0 OPEN HOLE PORTION of MAIN PASS. MTEM, SP, TENS, & TEND WERE SHIFTED WITH LL8. MERGE BASE 10938.0 10956.0 10985.0 / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ? ?MATCH3. OUT / ? ?MATCH4. OUT $ CN : BP EXPLORATION WN : Y - 37 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR BCS 68 2 DT BCS 68 3 TEND BCS 68 4 TENS BCS 68 i GAPI i US/F i LB 1 LB 4 4 67 465 06 6 4 4 84 653 71 5 4 4 20 789 90 0 4 4 20 789 90 0 5 6 ? 8 9 LL8 DIL 68 I OHMM ILM DIL 68 I OHMM ILD DIL 68 I OHMM SP DIL 68 I MV MTEMDIL 68 i DEGF 4 4 4 4 4 36 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 30 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 4 50 746 76 Tape File Start Depth = 10995.000000 Tape File End Depth = 10630.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7311 datums Tape Subfile: 2 175 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 3 is type.' LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 10054.0 10630.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH R~S: CN FN COUN STAT CASED HOLE PORTION of MAIN PASS. $ : BP EXPLORATION : Y- 37 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 3 Curves: Name Tool Code Samples Units i GRCH GR 68 I GAPI 2 TEND GR 68 I LB 3 TENS GR 68 I LB Size API API API API Log Crv Crv Length Typ Typ Cls Mod 4 4 21 990 60 6 4 4 10 579 41 1 4 4 10 579 41 1 12 * DATA RECORD (TYPES O) Total Data Records: 19 1014 BYTES * Tape File Start Depth = 10630.000000 Tape File End Depth = 10043.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4701 datums Tape Subfile: 3 44 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS TOOL STRING NUMBER: PASS NUMBER.' DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS ~ Curves and log header data for each run and tool string in separate files; Tool String $1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 2 0.2500 VENDOR TOOL CODE START DEPTH GR 10054.0 AC 10623.0 DIFL 10624.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY BHC-ACOUSTILOG DUAL INDUCTION BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: STOP DEPTH' 10938.0 10956.0 10985.5 27-OCT-93 FSYS REV. J001 VER. 1.1 1200 27-OCT-93 1949 27-OCT-93 11015.0 10988.0 10054.0 10985.0 2700.0 TOOL NUMBER 3974XA 3967XA 2806XA 3506XA 1309XA 1609EA/1603MA 1503XA 6.750 10659.0 10630.0 LSND 9.40 42.0 10.8 7.2 198.2 1.830 0.460 2.280 45.0 198.2 52.0 MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 0. 000 1.850 0.000 NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 TOOL STANDOFF (IN): 0.0 REMARKS: MAIN PASS. GAMMA RAY LOGGED FROM CASING POINT TO 10054'. $ CN : BP EXPLORATION WN : Y - 37 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA 0.0 52.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR AC 68 i GAPI 2 AC AC 68 i US/F 3 ACQ AC 68 1 4 CHT AC 68 i LB 5 TTEN AC 68 i LB 6 SPD AC 68 i F/MN 7 RFOC DIFL 68 I OHMM 8 RILM DIFL 68 i OHMM 9 RILD DIFL 68 i OHMM 10 SP DIFL 68 I MV 11 TEMP DIFL 68 i DEGF 12 CILD DIFL 68 i MMHO 13 VILD DIFL 68 i MV 4 4 06 969 49 6 4 4 48 852 89 1 4 4 81 285 47 0 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 53 419 67 0 4 4 40 467 34 0 4 4 34 704 23 6 4 4 04 522 10 6 52 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 212 Tape File Start Depth = 10995.000000 Tape File End Depth = 10043.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60638 datums Tape Subfile: 4 289 records... Minimum record length= Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 3 0.2500 VENDOR TOOL CODE START DEPTH GR 10620.0 AC 10620.0 DIFL 10620.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 10857.0 10875.0 10904.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY BHC-ACOUSTILOG DUAL INDUCTION BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): ~ LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: 27-OCT-93 FSYS REV. J001 VER. 1.1 1200 27-0CT-93 2009 27-0CT-93 11015.0 10988.0 10054.0 10985.0 2700.0 TOOL NUMBER 3974XA 3967]0% 2806XA 3506XA 1309XA 1609EA/1603MA 1503XA 6.750 10659.0 10630.0 LSND 9.40 42.0 10.8 7.2 198.2 1.830 0.460 2.280 0.000 1.850 45.0 198.2 52.0 0.0 52.0 MU~ CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN : BP EXPLORATION WN : Y - 37 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA 0.000 0.0 0.00 0.000 0.0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mo~ i GR AC 68 I GAPI 2 AC AC 68 i US/F 3 ACQ AC 68 1 4 CHT AC 68 i LB 5 TTENAC 68 i LB 6 SPD AC 68 i F/MN 7 RFOC DIFL 68 I OHMM 8 RILMDIFL 68 i OHMM 9 RILD DIFL 68 i OHMM 10 SP DIFL 68 1 MV 11 TEMP DIFL 68 i DEGF 12 CILD DIFL 68 i MMHO 13 VILD DIFL 68 I MV 4 4 06 969 49 6 4 4 48 852 89 1 4 4 81 285 47 0 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 53 419 67 0 4 4 40 467 34 0 4 4 34 704 23 6 4 4 04 522 10 6 52 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 66 Tape File Start Depth = 10914.000000 Tape File End Depth = 10618.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code~ 68 Tape Subfile: 5 Minimum record length= Maximum record length: 21292 datums 140 records... 62 bytes 1014 bytes Tape Subfile 6 is type: LIS 93/11/ i 01 **** REEL TRAILER **** 93/11/ 2 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 2 NOV 93 8:44a Elapsed execution time = 22.46 seconds. SYSTEM RETURN CODE = 0