Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout193-116XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
i~'/l~ File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
-[] Logs-of vadous kinds
[] Other
COMMENTS:
Scanned by: Dianna Vincent Nathan Lowell
_
U TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT A~D LOG
No. of Completions
1a. Well Status: 0 Oil 0 Gas 0 Plugged B Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4948' NSL, 807' EWL, SEC. 36, T11 N, R14E, UM
Top of Productive Horizon:
3101' NSL, 3664' WEL, SEC. 26, T11N, R14E, UM
Total Depth:
3862' NSL, 4591' WEL, SEC. 26, T11 N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 687542 y- 5950868 Zone- ASP4
TPI: x- 682985 y- 5954189 Zone- ASP4
Total Depth: x- 682039 y- 5954927 Zone- ASP4
18. Directional Survey 0 Yes B No
21. Logs Run:
CHT 1 GR / CNL 1 ZDL
Zero Other
5. Date Comp., Susp., or Aband.
9/15/2004
6. Date Spudded
09/10/1993
7. Date T.D. Reached
09/23/1993
8. KB Elevation (ft):
58.76'
9. Plug Back Depth (MD+ TVD)
11933 + 8875
10. Total Depth (MD+TVD)
11933 + 8875
11. Depth where SSSV set
NIA MD
19. Water depth, if offshore
NIA MSL
CASING, LINER AND CEMENTING RECORD
CAsl,Nq¡,'. ".'.' .. '....., ".'" .'.' """, ' $$,~~',Q~~HMb;~~l!IN~.PEe'J1~.~1
$,I;lE¡ , WT~eER'FT; , .' 'To~':/::::BQ:r;rQM'I';'ii,':rOpJ;"...BØtTOMI
20" 94# H-40 Surface 98' Surface 98'
13-3/8" 72# N-80 Surface 3029' Surface 2676'
9-5/8" 47# L-80 1 SOO-95 Surface 9450' Surface 7447'
7-5/8" x 7" 29.7# 129# NT-80 1 13Cr 8454' 11305' 6616' 8902'
4-1/2" 12.6# 13Cr80 11212' 11347' 8895' 8900'
3-1/2" x 2-7/8" 9.3# 16.5# L-80 11178' 11520' 8890' 8892'
., ~
23. Perforations oRen to Production (MD + TVD of Top and 24. ., ¡'. .
Bottom Interval, Size and Number; if none, state "none"): SIZE
None 4-1/2",12.6#, L-80
22.
.
MD
TVD
MD
SCANNED NOV 0 9 2004
26.
Date First Production:
Not on Production
Date of Test Hours Tested
PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + Oll-Bsl
Press. 24-HoUR RATE
2004
1b. Well Class:
B Development 0 Exploratory
0 Stratigraphic 0 Service
12. Permit to Drill Number
193-116 304-309
13. API Number
50- 029-20448-01-00
14. Well Name and Number:
PBU 02-16A
15. Field 1 Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
\ ADL 028308
17. Land Use Permit:
20. Thic~ness of Permafrost
, 1900' (Approx.)
. AMOUNT,
". P'U~'ED"
32" 431 sx Permafrost
17-1/2" 2500 sx Fondu, 400 sx PF 'C'
12-1/4" 1965 sx Class 'G', 300 sx PF 'C'
9-5/S" x S-1/2"380 sxClass 'G'
6" Uncemented
3-3/4" Uncemented
" ,', . :' 'T'ùåJ~G,:RE60Rd
DEPTH SET (MD)
10922'
TVD
GAs-McF
W A TER-Bsl
, ," ~
'25. ACID" F~CTURË;CEME;NTSQUEezE, 'ETC~
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11040' Set IBP
10980' Set 1st Whipstock, Failed
10960' P&A with 5 Bbls Class 'G'
10949' Set 2nd Whipstock, Pump 5 Bbls Class 'G' on top
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
NIA
Oll-Bsl
GAs-McF
W A TER-Bsl
PACKER SET (MD)
10766'
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
27.
CORE DATA,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
Form 1 0-407 Revised 12/2003
ORIGINA
CONTINUED ON REVERSE SIDE
RBDMS 8FL NOV - 9 7004
Ctf
28.
)
29.
)
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Shublik
10401'
8278'
8323'
None
Sag River
10351 '
Sadlerochit
10478'
8393'
30. List of Attachments: Summary of Pre- Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~~ . ~ Title CT Drilling Engineer Date 11-03 --DC¡
PBU 02-16A 193-116 304-309 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Sean McLaughlin, 564-4694
Permit No.1 Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
SCANNED NO\f 0 9 2.004
ITEM 29: List all test information. If none, state IINone".
Form 1 0-407 Revised 12/2003
Submit Original Only
)
)
Well:
Field:
API:
Permit:
02-16B
Prudhoe Bay Unit
50-029-20448-01-00
204-157
Accept:
Spud:
Release:
Rig:
09/19/04
09/24/04
10/03/04
Nordic #1
PRE-RIG WORK
08/07/04
DRIFT W I TEL, 3.70 CENT & SAMPLE ßAILER TO 11,101' SLM. (STOPPED DUE TO DEVIATION). TT LOC @
10,892' SLM. NO ELM OR BASE FLANGE MEASUREMENT. TT CORRECTED FROM MD = 11,131'. BAILER
EMPTY. CALIPER FROM 10,950 TO GLM #2 @ 6899' SLM. HUNG UP IN GLM - STAND BY FOR CALIPER TO
CLOSE. WILL RE-CALlPER FROM GLM TO SURFACE AT LATER DATE.
08/08/04
CALIPER FROM 7050' SLM TO SURFACE - GOOD DATA RECOVERED. TURN WELL OVER TO DSO - LEFT
WELL SHUT IN.
08/31/04
RAN 3.70" X 20' DUMMY WHIPSTOCK. SET DOWN @ 10775' SLM. HAD TO JAR UP TO GET FREE. POOH.
CUT WIRE ON BOTTOM OF TRSV. FISHED OUT TOOL STRING @ 11084' SLM. GS WAS SHEARED, LEFT
DUMMY WHIPSTOCK ON BOTTOM. COULDN'T LATCH DUMMY WHIPSTOCK ON FIRST ATTEMPT.
09/01/04
LATCH DUMMY WHIPSTOCK @ 11,105 SLM, (ZEROED @ GS ADD 20' TO BOTTOM OF D;WHIPSTOCK=
11,125 SLM). HUNG UP @ 10,785 SLM, HIT OJ 500# OVER TO GET FREE, HEAVY DRAG UP TO 10,700 SLM.
RAN 3.805 GUAGE RING, 4.5 BLB. OUTTT @ 10,922 MD 2X WI NO PROBLEM. TURN WELL OVER TO DSO
TO POP.
09/04/04
SET BAKER 3-3/8" IBP IN 7" LINER AT 11040 FT (MID ELEMENT AT 11042.5 FT).
09/14/04
RIH WI 2-1/8" BAKER MHA I PDS GR-CCL WI CARRIER 13.64" NOZZLE. TAG IBP AT 11029 (UP) CTMD. NO
PROBLEMS SEEN. POH AT 40 FPM LOGGING TO 10300. POH. JOB IN PROGRESS.
09/15/04
OOH. VERIFY DATA. GOOD DATA. MU AND RIH WITH DUMMY WHIPSTOCK TO 11000. NO PROBLEMS
SEEN. POH. RIH W 14-1/2" X 7" GEN II WHIPSTOCK. SET WHIPSTOCK AT 10980'. POH. RIH WITH 3"
JOUST NOZZLE. TAG WHIPSTOCK AND RESET COUNTER TO 10980. MIX AND PUMP 5 BBLS 15.8 PPG
CEMENT.
09/16/04
CLEAN-OUT TO 10960 CTMD. CHASE CEMENT OUT OF HOLE AT 80% USING XSLK KCL. FREEZE
PROTECT WELL TO 2500 WITH 50/50 MEOH. NOTIFY DSO THAT WELL REMAINS SI. RDMO.
SCANNED NOV 0 9 ZOO"}
)
')
BP EXPLORATION
Operations Summary Report
Page 1 418
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-1 6
02-1 6
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 9/19/2004
Rig Release: 10/3/2004
Rig Number: N1
Spud Date: 7/7/1980
End:
Däte From - To Hours Task Code NPT Phase Description of Operations
9/19/2004 01 :00 - 02:30 1.50 MOB P PRE SAFETY MEETING. Held pre-rig move meeting with security,
CPS, Nordic, Schlumberger and BP. Reviewed rig move
procedure, hazards and mitigation for rig move.
02:30 - 11:15 8.75 MOB P PRE Moved rig from S pad to the Frontier corner on the spine road,
when
a 1" hydraulic hose to the rigs front right hydraulic drive gear
failed at 11 :15 AM and 20 gallons of hydraulic oil was spilled on
the spine road.
The crew immediately stopped the rig and source of the
hydraulic power. The spill was immediately contained on the
spine road and security and spill response was notified.
11:15 -13:00 1.75 MOB N RREP PRE Rig crew cleaned up spill with absorbent as good as possible.
Replaced 1" hydraulic hose to drive system and backed rig
away from spill area.
The spill was cleaned up further and absorbent was laid over
the spill area.
The rig pulled forward and ACS came in behind the rig and
spread absorbent material over the spill area and swept it up.
The spill was reported as a 20 gal reportable spill. An incident
report will be written.
13:00 - 22:30 9.50 MOB P PRE Moved rig from Frontier corner to DS 02-16B.
22:30 - 22:45 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitgation
for backing rig over well. Well is dead and all valves are
closed.
22:45 - 23:00 0.25 MOB P PRE Backed rig over well and sat rig down.
ACCEPT NORDIC 1 ON DS 02-16B AT 2300 HRS,
09/19/2004.
23:00 - 00:00 1.00 BOPSUP P PRE Nipple up BOPE. Spot trailers and cuttings tank. Installed
dikes in rig cellar.
9/20/2004 00:00 - 01 :30 1.50 BOPSURP PRE Nipple up BOPE. Spot equipment. General rig up.
01 :30 - 05:00 3.50 BOPSUP P PRE Pressure 1 function test BOPE. Send test report to AOGCC.
Fill rig pits with 2% KCL with 2# Biozan.
05:00 - 07:00 2.00 STWHIP P WEXIT M/U Baker CTC. Pull test. C/O pack-off.
07:00 - 08:30 1.50 STWHIP P WEXIT MU BHA. Fill coil with 2# Biozan KCL water.
08:30 - 10:45 2.25 STWHIP P WEXIT RIH
10:45 - 18:00 7.25 STWHIP P WEXIT Mill window. 2.4 bpm @ 2100 psi. FS=1900 psi 50 K Up Wt,
!3K On Wt.
Mill from 10,985 to 10,997'. Exit poiint of window not clear.
No stalls milling window.
18:00 - 19:30 1.50 STWHIP P WEXIT Mill formation, Slow Rap, stacking wt, 2.5/2.5 bpm, 1950-
2400 psi. 6K WOB,
Milled to 10,998'. Back ream window, 48K up wt. No motor
work up thru window.
Ream to bottom with no motor work. Tag bottom at 10,997.5
ft.
19:30 - 21 :30 2.00 STWHIP P WEXIT Milling formation, Slow ROP. Swap to FloPro. Mill down to
11,000'. 2.5/2.5 bpm, 2680 - 3000 psi, 1.5 fph.
Backream window at 1 fpm. 44K up wt with FloPro. Window
clean, no motor work.
21 :30 - 22:30 1.00 STWHIP P WEXIT Ream down clean to TD of 10,999'. Backream. RIH clean with
no pump. Window is clean.
22:30 - 00:00 1.50 STWHIP P WEXIT POH. circ at 2.4 bpm, 2500 psi. Circ. while POH to surface.
:SLAN~\E.C~ NQ\ 0 9 ?fHì4 Printed: 10/4/2004 7:32:41 AM
)
)
Page 2 48Þ
BP EXPLORATION
Operations Summary,'Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-16
02-16
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date From - To Hours Task Code NPT Phase
9/21/2004 00:00 - 00:30 0.50 STWHIP P WEXIT
00:30 - 01:15 0.75 STWHIP P WEXIT
01 :15 - 01 :30 0.25 STWHIP P WEXIT
01 :30 - 02:30 1.00 STWHIP P WEXIT
02:30 - 04:30 2.00 STWHIP P WEXIT
04:30 - 05:30 1.00 STWHIP P WEXIT
05:30 - 06:30 1.00 STWHIP P WEXIT
06:30 - 07:00 0.50 STWHIP P WEXIT
07:00 - 10:40 3.67 STWHIP N DPRB WEXIT
10:40 - 12:30 1.83 STWHIP N DPRB WEXIT
12:30 - 13:30 1.00 STWHIP N DPRB WEXIT
13:30 - 15:30 2.00 STWHIP N DPRB WEXIT
15:30 - 15:40 0.17 STWHIP N DPRB WEXIT
15:40 - 16:00 0.33 STWHIP N DPRB WEXIT
16:00 - 17:30 1.50 STWHIP N DPRB WEXIT
17:30 - 18:30
1.00 STWHIP N
DPRB WEXIT
18:30 - 19:15 0.75 STWHIP N DPRB WEXIT
19:15 - 19:30 0.25 STWHIP N DPRB WEXIT
19:30 - 20:15 0.75 STWHIP N DPRB WEXIT
20: 15 - 20:35 0.33 STWHIP N DPRB WEXIT
20:35 - 22:30 1.92 STWHIP N DPRB WEXIT
SC/ANNEr':
Start: 9/19/2004
Rig Release: 10/3/2004
Rig Number: N1
Spud Date: 7n/1980
End:
Descriptiol1öfOperations
POH with milling BHA. Circ to surface.
UO milling BHA. Recover 100% of BHA. Mill was worn across
the face.
M/U SWS CTC. Pull test and press test CTC.
SAFETY MEETING. Pre-Spud meeting with crew. Review
well plane and hazards.
PJSM for M/U MWD BHA. Review procedure, hazards and
mitigation for M/U MWD BHA.
M/U MWD Build BHA #2. 4.125" HC Bi-center bit, 2.29 deg
motor and Sperry MWD.
OAL = 65.32 ft.
RIH with build MWD BHA. SHT tools, OK. Got 2 for 2 clicks
with orienter. RIH.
Stop at flag, correct -31 ft CTD.
Orient TF to SOL.
Trouble getting clicks. TF readings may not be correct.
Log GR tie-in in 7" to confirm depths. Added 28 ft to CTD.
Whipstock appears to have been set about 30 ft deep when it
was set on coil.
RIH and tag TO at 11,026 ft.
Top of whipstock should be at 11,007 ft. Top of window at
11,012 ft.
Drill build section, stall at 11,026 ft. Time drill 11028. Start to
drill off 3550 psi @ 2.54 bpm, 3400 psi FS. Pick up seeing
overpulls and motor work at 11022'. Orienter failed.
POH for failed orienter.
C/O orienter and MWD probe. Bit was trashed, graded at
8,8,1/8". It was drilling on and beside metal. M/U 3.80. HC
diamond window mill and string reamer to dress window.
Checked scribe offset, OK.
RIH with 3.80" HC Diamond window mill, string reamer and
2.29 deg motor. BHA #3. OAL = 66.27 ft. SHT tools OK, 2
for 2 clicks with orienter. RIH.
Orient TF to 54L. one for one on clicks.
Log tie-in with GR inside 7" liner. [-9 ft CTD].
Ream window. Tag TO at 11,028.5 ft. Clean hole to TO. No
stalls or motor work in window track. Mill forward, 2.5 I 2.5
bpm, 3400 - 3800 psi, 43L TF, 4-6K WOB,
Milled to 11,030 ft.
Mill window, very slow progress, 2.6 I 2.6 bpm, 3200 - 3850
psi, 43L TF, 5-6K WOB, Milled to 11,030.9 ft.
Back ream to get free spin of 3450 psi, dwn wt of 14.5K, Tag
at 11,031'.
Continue milling with 45L TF, 2.5/2.5bpm 3450/4040psi, 3-5k
WOB. Mill to 11033'.
Mill to 11033.3' with 49L 2.5/2.5bpm 3450/4040psi, 4-5k WOB.
Stacking wt. P/U & establish freespin @ 2.5bpm/3500psi. Up
Wt = 34.5k. S/O wt = 15k. Ease back into milling.
Mill to 11035' with 54L 2.5/2.5bpm 3450/4040psi, 5-6k WOB.
Mill to 11036' with 54L 2.5/2.5bpm 3450/4040psi, 6-7k WOB.
Mill to 11037' with 54L 2.5/2.5bpm 3450/4040psi, 6-7k WOB.
Stall @ 11037.2'. P/U & establish freespin @ 2.5bpm/3400psi.
Up Wt = 34.5k. S/O wt = 14k. Ease back into milling. Drill into
Pñnted: 101412004 7:32:41 AM
)
)
Page 34I8Þ
BP EXPLORATION
Qperations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-16
02-16
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
From - To Hours Task Code NPT Phase
--
9/21/2004
1.92 STWHIP N
20:35 - 22:30
DPRB WEXIT
22:30 - 00:00 1.50 STWHIP N
9/22/2004 00:00 - 00:40 0.67 STWHIP N
00:40 - 01 :30 0.83 STWHIP N
01 :30 - 01 :40 0.17 CLEAN N
01 :40 - 01 :50 0.17 CLEAN N
01 :50 - 02:45 0.92 CLEAN N
02:45 - 04:25 1.67 CLEAN N
04:25 - 04:35 0.17 CLEAN N
04:35 - 04:45 0.17 CLEAN N
04:45 - 07:30 2.75 CLEAN N
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
07:30 - 08:20 0.83 CLEAN N DPRB WEXIT
08:20 - 10:20 2.00 CLEAN N DPRB WEXIT
10:20 - 10:50 0.50 WHIP N DPRB WEXIT
10:50 - 12:00 1.17 WHIP N DPRB WEXIT
12:00 - 14:30 2.50 WHIP N DPRB WEXIT
14:30 - 15:45
1.25 WHIP N
DPRB WEXIT
15:45 - 16:20
0.58 WHIP N
DPRB WEXIT
Start: 9/19/2004
Rig Release: 10/3/2004
Rig Number: N 1
Spud Date: 7n/1980
End:
Description of Operations
hard spot (suspect CIBP) @ 11038'. Let mill burn for 30m ins @
11038.3' - no progress. Check btm samples - > 99% cmt &
steel. Decide to pull for an underreamer.
Paint EOP Flag @ 10800' & POOH milling BHA.
Continue POOH milling BHA.
OOH. PJSM. SIB injector & UD milling BHA #2. Observe very
loose lower motor bearing. No major marks on mills.
Held PJSM & HAlHM for reheading CT & M/U under-reaming
BHA#3.
Cut 5.5' CT & install Baker slip CTC. Pull test to 35k & PT to
3500psi - OK.
M/U under-reaming BHA #3 with 3-5/8" DB under-reamer,
Baker Xtreme motor, 2 jts of 2-3/8" PH6 tbg & MHA (OAL-
85.57'). Stab injector on well.
RIH with under-reaming BHA #3 without pumping. Correct CTD
-12' @ the flag.
RIH BHA #3 belowTT to 10940'. Up wt check = 44k, Down Wt
= 17k. Bring on pumps & establish freespin @ 2.2bpm/2580psi.
Under-ream down in the 7" from 10940' to 11010' with flopro
mud @ 2.22/2.22bpm, 2580psi. Observe no motor work. PUH
to 10940'.
Under-ream 7" up/down 4x from 10930' to 11010' @
2.2/2.2bpm, 2550psi & 4fpm. Meanwhile W.O vac trucks to
swap the well back to KCL for setting the next WS.
No motor work seen. Liner should be clean from 10930 -
11010'.
Drop 3/4" steel ball to open circ sub. Ball on seat at 50 bbls.
Swap to KCL water.
POH chasing FloPro to surface with KCL water. 3.1 bpm,
1500 psi.
Flag CT at 10,800' EOP. POH.
SAFETY MEETING. Review procedure, hazards and
mitigation for C/O BHA. Review procedure for M/U whipstock
and running tools.
UO BKR Underreamer BHA. M/U BKR 7" Gen II whipstock
with FAIV, Sperry MWD, Orienter and MHA.
Insert 2 RA PIP tags in whipstock, 10ft from top of whipstock.
RIH with Baker 7" Gen II whipstock, FAIV and Sperry MWD.
SHT at 1400'. Circ. at 1.6 bpm, good data and tested orienter
OK. RIH.
Correct to EOP flag at 10,800'. Added 4 ft CTD.
Log GR tie-in at 10945'. Log down in 7" liner. Subtract 4 ft
CTD.
40K up wt. Circ. at 0.6 bpm to get Sperry data.
Orient Whipstock TF to 9L of high side.
Top of whipstock at 10950' per Anc. Eng.
Increase pump to 2.1 bpm, 2.3, 2.6, 2.9, 3.0 bpm, FAIV
Armed.
Stop pump, pump 0.2 bpm, FAIV sheared and set whipstock at
2900 psi.
Final Whipstock TF was 8R, got a final click when dropped
pump to set whipstock.
SCANNED NO'-! n 9 2004
Printed: 10/4/2004 7:32:41 AM
')
)
BP EXPLORATION
Operations Summary Report
Page 4 ~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-16
02-16
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 9/19/2004
Rig Release: 10/3/2004
Rig Number: N 1
Spud Date: 7/7/1980
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/22/2004 15:45 - 16:20 0.58 WHIP N DPRB WEXIT Whipstock set with top at 10,950'. Tray TF at 8R of high side.
RA tag at 10,960'
16:20 - 18:00 1.67 WHIP N DPRB WEXIT POH with whipstock running tools.
18:00 - 18:30 0.50 WHIP N DPRB WEXIT UO whipstock setting tools with FAIV, Sperry MWD, Orienter
and MHA.
18:30 - 20:30 2.00 WHIP N DPRB WEXIT M/U Cementing BHA with 3.0" big hole nozzle, 6' x 2-3/8" PH6
pup, XO & CTC (OAL - 7.89')
20:30 - 21 :00 0.50 WHIP N DPRB WEXIT RIH with cementing BHA. Wt chk @ 10900' - Up = 40k, Run-in
= 21k. Lightly tag WS pinch pt 2x @ 10972'. Correct CTD to
10954.6'. Set down 2k on WIS. P/U with 2k Olpull. PUH to
10940' & flag pipe. Meanwhile RIU SLB Cementers & prime up.
21:00 - 21:15 0.25 WHIP N DPRB WEXIT SI well & confirm Obpm injectivity @ 1000psi - saw slight
pressure bleeding-off.
21:15 - 21:30 0.25 WHIP N DPRB WEXIT PJSM with all personnel concerning cementing operations.
21 :30 - 22:45 1.25 WHIP N DPRB WEXIT FlushlPT lines to 4k. Mix & pump 5bbls 15.8ppg class 'G' cmt
slurry & 5bbls of water behind @ 2.0/2.0bpm & 1070psi. Chase
with KCL water @ 2.5/2.5bpm & 2000psi. Pump 1 bbl of cmt
out of nozzle. POOH laying in remaining cmt @ 1 :1. Observe
pin-hole in CT on the reel @ +1-10780'. Continue POOH to
10000'. TOC - +1-10650'.
22:45 - 23: 15 0.50 WHIP N DPRB WEXIT Circulate down bio-KCL to nozzle @ 1.4bpmflOOpsi with mist
oozing out of pin-hole.
23:15 - 00:00 0.75 WHIP N DPRB WEXIT RBIH to 10760' (below SWS nipple) contaminating cmt @
1.0bpm/500psi. Swap well to bio-KCL milling fluid.
9/23/2004 00:00 - 02:40 2.67 WHIP N DPRB WEXIT POOH chasing cmt contaminated fluid OOH & jetting across
nipples.
02:40 - 02:50 0.17 WHIP N DPRB WEXIT COHo UD cmt nozzle BHA.
02:50 - 03:00 0.17 WHIP N DPRB WEXIT M/U swizzle stick & jet BOP stack. Flush choke manifold lines.
03:00 - 03: 10 0.17 WHIP N SFAL WEXIT PJSM for BID CT with N2.
03:10 - 03:45 0.58 WHIP N SFAL WEXIT P/Test N2lines - OK. BID CT with N2 & bleed off. SIB injector
& UD swizzle stick.
03:45 - 04:00 0.25 WHIP N SFAL WEXIT PJSM for stripping off & pulling back CT to the reel.
04:00 - 04:45 0.75 WHIP N SFAL WEXIT Slip connector into CT & pull test. Strip-off CT from injector &
spool back to reel.
04:45 - 05:15 0.50 WHIP N SFAL WEXIT Secure CT & prep reel for shipment.
05:15 - 08:15 3.00 WHIP N SFAL WEXIT RD hardline to reel. ETA for new CT reel - 06:30hrs & ETA for
Peak crane - 07:00hrs.
08:15 - 08:30 0.25 WHIP N SFAL WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for picking reel with Peak crane and setting in new
reel of coil.
08:30 - 12:00 3.50 WHIP N SFAL WEXIT Pick reel with crane. Remove reel bushings and install new
reel bushing. Pick replacement reel of coil and set in reel
stands. Insert reel bushings into reel.
12:00 - 13:30 1.50 WHIP N SFAL WEXIT Pull coiled tubing to injecter head and stab into chains. M/U
Baker CTC and pull test.
RIU hardline inside reel.
13:30 - 14:00 0.50 WHIP N SFAL WEXIT Fill coil with Biozan, 2.8 bpm, 1200 psi.
14:00 - 15:00 1.00 STWHIP N DPRB WEXIT M/U window milling BHA with 3.80. HC diamond window mill,
string reamer, straight motor, 2 jts PH6 and MHA. OAL = 84.7
ft.
15:00 - 17:00 2.00 STWHIP N DPRB WEXIT RIH with window milling BHA. BHA #5.
Tag firm cement at 10,766'.
SWS UCA cement sample at 2500 psi.
Printed: 10/4/2004 7:32:41 AM
SCAN!\JEf" ¡ . '! ~;¡
,.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
)
.)
Page 5-
BP EXPLORATION
Operations Summary Report
02-16
02-16
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
9/23/2004
17:00 - 18:30
From - To Hours Task Code NPT Phase
DPRB WEXIT
18:30 - 19:15
19:15 - 19:45
9/24/2004
19:45 - 20:45
20:45 - 21:35
21 :35 - 22:45
22:45 - 00:00
00:00 - 00:20
00:20 - 03:00
03:00 - 03:40
03:40 - 05:00
05:00 - 07:45
07:45 - 08:00
08:00 - 09:15
09:15 -11:15
11:15-11:40
11 :40 - 11 :50
11 :50 - 13:30
13:30 - 13:45
13:45 - 14:15
14:15 - 15:45
15:45 - 17:30
17:30 - 17:50
17:50 - 18:45
1.50 STWHIP N
0.75 STWHIP N
DPRB WEXIT
0.50 STWHIP N
DPRB WEXIT
1.00 STWHIP N
0.83 STWHIP N
1.17 STWHIP N
1.25 STWHIP N
0.33 STWHIP N
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
2.67 STWHIP N
DPRB WEXIT
0.67 STWHIP N
DPRB WEXIT
1.33 STWHIP N
DPRB WEXIT
2.75 STWHIP N
DPRB WEXIT
0.25 DRILL P
PROD1
1.25 DRILL P
PROD1
2.00 DRILL P
PROD1
0.42 DRILL P
0.17 DRILL P
1.67 DHILL P
PROD1
PROD1
PROU1
0.25 DRILL P
0.50 DRILL P
PROD1
PROD1
1.50 DRILL P
PROD1
1.75 DRILL P
0.33 DRILL
0.92 DRILL
P
PROD1
0.17 DRILL P
PROD1
Start: 9/19/2004
Rig Release: 10/3/2004
Rig Number: N 1
Spud Date: 7 n /1980
End:
Description of Operations
Mill firm cement, 2.6 bpm, 2000 psi, 70 fph, Stall at 10,795'.
Soft cement below this depth, Mill soft cement at 110 fph. 300
psi motor work. 2K WOB.
Milled soft cement to 10,900 ft.
Pick up wt = 44K, Down wt = 15k.
Milling soft cement at 110 fph, 2.6 bpm, 1650-2100 psi, 2K
WOB. Stall @ WS/Lnr pinch pt - 10956'. Flag pipe & correct
depth to 10954.6'. Up wt = 44.5k. S/O wt = 14k. Freespin =
2.55bpm/1570psi.
Start milling window with 2.55/2.55bpm 1570/1670psi, 1-2k
WOB. Mill to 10955'.
Mill to 10956' with 2.55/2.55bpm 1570/1950psi, 2k WOB.
Mill to 10957' with 2.55/2.55bpm 1570/2050psi, 3k WOB.
Mill to 10958' with 2.55/2.55bpm 1570/2050psi, 4k WOB.
Mill to 10959.5' with 2.55/2.55bpm 1570/2050psi, 5k WOB.
Mill to 10960' with 2.55/2.55bpm 1570/2050psi, 6k WOB. Mill
should be @ window mid point.
Control mill to 10962' with 2.55/2.55bpm 1570/2250psi, 4k
WOB. Stall @ 10962.5'. P/U & establish freespin @
2.55bpm/2000psi. Ease back into milling & exit Inr.
Mill formation to 10972' with 2.55/2.55bpm 2000/2450psi, 3k
WOB & 25fph ave Rap. Geo seeing formation in BU samples.
Swap well bore to reconditioned flopro mud. Meanwhile
backream & dress window/rat hole 3x & drift 2x. Window looks
clean. Tentative window depths are: TOWS = 10950', TOW =
10954.6', BOW = 10962.5', RA PIP Tag = 10960'.
Paint EOP flag @ 10800' & POOH window milling BHA. POH.
Circ to surface.
SAFETY MEETING. Review procedure, hazards and
mitigation for M/U MWD BHA.
M/U Build 1 Turn MWD BHA # 8 with HC Bi-center bit, 1.69 deg
motor, MWD, orienter and MHA. OAL =
RIH with BHA #8. SHT tools at 1400 ft. All tested OK. RIH.
Correct -13 ft CTD to EOP flag at 10,800'.
Orient TF to 50L.
RIH thru window. Clean window. Tag TO at 10,971 ft.
Drilling Z2 Build 1 turn section, 2.61 2.6 bpm, 3230 - 3900 P. .
50L TF, 62 deg incl, 50 fph, Drilled to 11047'
Orient TF to 66L.
Log GR tie-in with GR in original ope . Subtract 1 ft CTD.
TOWhipstock at 10,949', TO ow at 10,954', RA tag at
10,959'.
Drilling Z2 B' urn section, 2.6/2.6 bpm, 3230 - 3900 psi,
66L T, deg incl, 50 fph, Drilled to 11,086'
ling Z2 Build 1 tum section, 2.6/2.6 bpm, 3230 - 3900 psi,
78L TF, 70 deg incl, 40 fph, Drilled to 11,128'
Wiper trip to window. Clean hole. RIH.
Drilling Z2 Build 1 turn section, 2.6 12.6 bpm, 3230 - 3900 psi,
72L TF, 71 deg incl, Stacking weight. Drill thru shale @
11150'.
Drill to 11181' with 90L TF, 2.6/2.6bpm 3250/3600psi, 3k WOB
& 85fph ave Rap.
Orient 1 click & drill to 11190' with 80L TF, 2.6/2.6bpm
SCANNED Nn\f n 9 '200~,
Printed: 10/4/2004 7:32:41 AM
~
~,
W6Æ ã(l\wc:'c\-
j)7S cFl ({ ( ~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
. Abandon 0 Repair Well II Plug Perforations 0 Stimulate 0 Other
0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
2. Operator Name: 4. Current Well Clay-: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. II Development D Exploratory 193-116 /'
13. Address: D Stratigraphic D Service 6. API Number: ~
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20448-01-00
7. KB Elevation (ft): 58.76' 9. Well Name and Number:
PBU 02-16A /
8. Property Designation: 10. Field / Pool(s):
ADL 028308 Prudhoe Bay Field / Prudhoe Bay Pool
11'. '....i.i,'. ,".'.,'.". ',. ,i~."~"."~.' "".' ...,.'."'..:!i: ;I,. .< ""i'."'". '...i'."." '....,.,.., ...,...".r.. ."',....'...
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11933 ~75 11933 8875 None None
.<,. 'v., Sb'I¡,... ."".,..': < Mt ,',".'. ,oTVD. ,8t.11'$t ..
""nl'l, 'M"" 98' 20" 98' 98' 1530 520
~ 3029' 13-318" 3029' 2676' 5380 2670
9450' 9-518" 9450' 7447' 6870 4760
~
Liner 2006' 7" 9299' - 11305' 7317' - 8902' 8160 7020
Liner Tieback 845' 7-5/8" 8454' - 9299' 6616' - 7317' 6890 4790
Liner 135' 4-1/2" 11212' - 11347 8895' - 8900' 8430 7500
Liner 342' 3-1/2" x 2-7/8" 11178' - 11520' 8890' - 8892' 10160 10530
Perforation Depth MD (ft): Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Rlt:crbing MD (ft):
11098'-11923' 8867' - 8875' 4-1/2", 12.6# L-80 . &... '
Packers and SSSV Type: 7" Baker 'FB-1' pkr; 4-1/2" Baker 'SC-1L' pkr; 7" Baker Packers and SSSV MD (ft): 11212"; 'f1&2Jt,Jl0766';
'SABL-3 pkr; 4-1/2" Camco 'TRDP-4A' SSSV Nipple I¡ I'{ .2103'
.~. 'j"1 ¡,... A
12. Attachments: 13, Well Class after proposed ~a¡~'J 1"'14
II Description Summary of Proposal D BOP Sketch D Exploratory II I~ .S~rvice
D Detailed Operations Program ~
14. Estimated Date for AU9~ 12)004 15. Well Status after proposed work: -q<a
Commencing Operations: DOil DGas D Plugged II Abandoned
16. Verbal Approval: Ðaté: DWAG DGINJ DWINJ D WDSPL
Commission Recresentative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean Mclaughlin, 564-4694
Printed Name Sean McLaughlin Title CT Drilling Engineer
. ç-. ¡v1l(rV Date 81to/CJ~ Prepared By NameiNumbe~
Sianature Phone 564-4694 Terrie Hubble, 564-4628
... ... .'..............., '.'.i.'... .
Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: 304. ,YJq
D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance
. ,..... ~~lÁ{rrtf J for ~;Jx~L ~il Ol-/IPß.
Other: A-p fh6l1l J 1-0 nt.L 1(9 . 40 I
",'...,""'Fo _off - 407
Date {'ltr/#'/
~provoo ~~ .t '(¿. APPROVED BY
COMMISSIONER THE COMMISSION
Form 10-403 ~ ~ S~b~Jfr' îu~ ~O,
FL
ORIGINAl.,
RBDMS B
~
~
bp
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: S.M. McLaughlin
CTD Engineer
Date:
August 8, 2004
Re:
P&A operations for well 02-l6A as part of the CTD sidetrack
Well 02-16A is a candidate for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig. If
the Kuparuk River bridge closure is longer than expected drilling operations could commence as early as
8/13/04. The sidetrack, 02-l6B, will exit the existing 7" liner off a whipstock in Zone 2 and target Zone lA.
The proposed kick off point is above the existing perforations, which will be isolated by a CIBP and cement. /
The following describes work planned for the P&A and is submitted as an attachment to Form 10-403. A
schematic diagram of the proposed sidetrack is attached for reference.
Pre CTD Summary
1) 0 MIT-OA
2) 0 MIT-IA
3) 0 AC-LD aT; AC-PPPOT-IC; AC-PPPOT-T
4) E Set C Rat 11100'
5) E Set í5Stock at 11000' ?
6) C ~ë off per~agb~s ~.¥~ve tt~w at the TOW,
The pre CTD work is slated to begin on 8/09/04.
Sean McLaughlin
CTD Drilling Engineer
564-4694
CC:
Well File
Sondra StewmaniTerrie Hubble
..---...
~
TREE =
GRAY GEN2
WB.UEAD = FMC
ACTUATOR - AXELSON
KB. EL.EV = 58,8'
B F. EL.EV =
KOP= 1298'
Max Angle = 97 @ 11784'
DatumMD= 1107T
DatumTVD = 8800' SS
02-16A
SAFErY NOTES: 4-112" a-tROMETBG. HORIZONTAL
WELL - 70° @ 11097' AND 90' @ 11274'
7" LNR, 29#, NT-SO, .0371 bpf, 10 = 6.184"
29'
5-1/2" X 4-1/2" XO
15-1/2" lBG, 17#, L-80, .0232 bpf, 10 = 4.892" H
I TOP OF 4-1/2" lBG H
13-3/8"CSG, 72#, N-80, 10 = 12.34T'
2103' 4-1/2" CAM lRlF-4A SSSV NP, 10 = 3.812"
.
GAS LIFT MA.tÐRB.S
ST M) TVD DEV lYÆ VLV LA.TCH PORT DATE
1 3597 3056 48 TGRJ RK
2 6941 5444 39 TGRJ RK
3 9100 7148 33 TMPOX BK
4 9205 7237 32 TMPDX BK
Minimum ID =2.441" @ 11186'
3-112" X 2-7/8" XO
TOPOF7-518" LNR-TIEBACK
9270'
4-lIZ' BAKER FaR
7-518" LNR- TBI<, 29.7#, NT-SO, :0459 bpf, D = 6.875"
TOP OF 7" LNR
MILLOUT WltÐCNV
9450' - 9500'
9-518" CSG, 47#, L-80, 10= 8.681"
10754'
4-1/2" Ail.R<ER SWS NIP, 10 = 3.81Z
4-HZ' TlBlNG TA R.. WLEG
HB.MDTTNOTLOGGED I
4-1/2"TBG, 12.6#, L-80, .0152bpf, 10= 3.958"
10922'
11178'
4-1/2" BAKERSC-1 L PKR
TOP OF 3-1/Z' LI'R - CT
3-1/2" LI'R-CT, 9.3#, L-80, .0087 bpf ,10 = 2.992"
TOP OF 2-7/8" LI'R - PORTED
11186'
11212'
11218'
3-1/2" X 2-7/8" XC, D = 2.441"
7" BAKER FB-1 A<R(B8-i LNR)
4-1/2" PARKER SWS NIP,
10 = 3.813"
4-1/2" lBG,12.6#, 13-CR-80, .0152 bpf, 10= 3.958"
H4-1/2" lUBING TAIL I
PERFORATIOO SUMMA.RY
REF LOG: MJVD ON 10/22/93
ANGLE AT TOP PERF: 68 @ 11098'
N:Jte: Refer to R-oduction DB for hisbrical perf data
SIZE SPF 1N1ERII AL OpnlSqz DATE
2-7/8" 4 11098-11114 0 10/16/00
2-7/8" 32 11347-11923 0 10,Q2/93
2-7/8" 32 11347 -11520 0 04/29/94
2-7/8" BAKER FLOAT SHC
2-718" LNR- PORlED,6.5#,
L-80, .0056 bpf, 10 = 2.441"
11933'
Dt\1E RßI BY COMtÆNTS DATE REV BY COMII.£NTS
06/SO ORGINAL COMR.E1lON ..
10/31/93 SÅ’TRAO<
12/10/00 S5-Sl. T CONVERlED TO CANV AS
03108101 SIS-M) FINAL
01/31/02 RNITP CORRECllONS
06111/03 CM:>I1LP KB EL.EV A TIOO OORRECTIOO
PRUDI-OE BAY If\IlT
W8..L: 02-16A
PERMT N:J: 1931160
API N:J: 50-029-20448-01
SEC36, T11N, R14E,4589.95' FB..& 1417.31'FNI
BP exploration (Alaska)
TREE =
W8...LHEAD =
ACTIJATOR=
KB. 8...EV =
BF, 8...EV =
KOP=
Max Angle =
Datum MD =
DatumTVD=
GRAY GEN 2
FMC
AX8...S0N
58.8'
^~'\
02-168
Proposed CTD Sidetrack
1298'
. . ....- ....
.97 ~.1~?~:
11077'
8800' SS
5-1/2" TBG, 17#, L-80. .0232 bpf, 10 = 4.892"
TOP OF 4-1/2" TBG
13-3/8" CSG. 72#, N-80, D = 12.347"
TOPOF 7-5/8" LNR-ilEBACK I
7-5/8" LNR- TBK, 29.7#, NT-80, .0459 bpf, ID = 6.875"
I TOP OF 7" LNR H
TOP OF CEMENT
9-5/8" CSG, 47#, L-80, D = 8.681"
9450'
MLLOUT WNXJW
9450' - 9500'
Liner Top Packer
1 0840'
4-1/2" TBG, 12.6#, L-80, .0152 bpf. D = 3,958"
I Mechanical Whipstock I
ICIBP
I TOP OF 3-1/2" LNR- CT I
3-1/2" LNR-CT, 9.3#, L-80, .0087 bpf, D = 2.992"
TOP OF 2-7/8" LNR- PORTED
I TOP OF 4-1/2" TBG I
7" LNR, 29#, NT-80, .0371 bpf, ID = 6.184"
4-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf. ID = 3.958"
ÆRFORA TION SUMMARY
REF LOG: MWD ON 10/22/93
ANGLEATTOPÆRF: 68@ 11098'
Note: Refer to A-oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 11098 -11114 0 10/16/00
2-7/8" 32 11347-11923 0 10/02/93
2-7/8" 32 11347 - 11520 0 04/29/94
.
&, 'f NOTES: 4-1/2" CHROMETBG. HORIZONTAL
W8...L - 700@ 11097' AND900@ 11274'
29'
2103'
5-1/2" X 4-1/2" XO
-i4-1/2" CAM TRDP-4A SSSV NIP, 10 = 3.812" I
ST MD TVD
1 3597 3056
2 6941 5444
3 9100 7148
4 9205 7237
GAS LFT MANDR8...S
DEV TYPE VLV LATCH
48 TGPD RK
39 TGPD RK
33 TMPDX BK
32 TMPDX BK
PORT DATE
9270'
10754'
10766'
10909'
10922'
10850'
10850'
10860'
-i4-1/2" BAKER PeR I
4-1/2" PARKERSWS NIP, 10= 3.812"
7" BAKER SABL-3 A<R
4-1/2" PARKER SWS NIP, ID = 3.812"
4-1/2" TUBING TAR.. WLEG
8...MD 1T NOT LOGGED
Top of Cement
Top of 3-1/2" Liner
....j3-1/2" XNNIP, ID=2.75" I
I 3-3/16" X 2-7/8" crTi'ed and perfedl-i 13500' I
11178'
11186'
11212'
11218'
DATE REVBY COMMENTS DATE REVBY COM\1ENTS
06/80 ORIGINAL COMPLETION
10/31/93 SIDETRACK
12/10/00 SIS-SL T CONVERTED TO CANVAS
03/08/01 SIS-MD FNAL
01/31/02 RNITP CORRECTIONS
06/11/03 CMOITLP KB 8...EV A TION CORRECTION
4-1/2" BAKERSC-1L A<R
3-1/2" X 2-7/8" XO, ID = 2.441"
7" BAKER FB-1 A<R (BEH LNR)
4-1/2" PARKER SWS NIP,
ID = 3.813"
4-1/2" TUBING TAIL
PRUDHOE BA Y UNIT
W8...L: 02-16A
PERMIT No: 1931160
API No: 50-029-20448-01
see 36, T11N, R14E, 4589.95' Fa.. & 1417.31' FNL
BP Exploration (Alaska)
STATE OF ALASKA '~'~'
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
ADD PERFS Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__X RKB 62 feet
3. Address Explorato~._ 7. Unit or Property name
P. O. Box 196612 Stratigraphic__
Anchorac, le, AK 99519-6612 Service._ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
331' FNL, 4473' FEL, Sec. 36, T11 N, R14E, UM (map's 687542, 5950868) 02-16A
At top of productive interval '~ 9. Permit number / approval number
2014' FNL, 3669' FEL, Sec. 26, T11 N, R14E, UM (map's 682981, 5954354) ~ 193-116
At effective depth 10. APl number
1722' FNL, 4248' FEL, Sec. 26, T11 N, R14E, UM (map's 682390, 5954632) 50-029-20448-01
At total depth 11. Field / Pool
1423' FNL, 4582' FEL, Sec. 26, T11 N, R14E, UM (map's 682048, 5954922) Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Totaldepth: measured 11923 feet Plugs(measured) Tagg~l~7~l~(~6/22/1999).
I~ ~immq~ll~ B,m,l V I,,m !~'
true vertical 8875 feet
Effective depth: measured 11473 feet Junk (measured) MAR
true vertical 8892 feet
Casing Length Size Cemented"-~' ~ ~="" "---~ref~d~~Cc;~?ei~Vertica, Depth
Conductor 98' 20" 431 sx PF 130' 130'
Surface 2997' 13-3/8" 2500 sx Fondu, 400 sx 3029' 2676'
PF 'C'
Intermediate 9432' 9-5/8" 1965 sx Class 'G', 300 sx 9450' 7449'
PF 'C'
Liner Tieback 845' 7-5/8" Uncemented 8454' - 9299' 6616' -7317'
Liner 1736' 7" 380 sx Class 'G' 9299' - 11035' 7317' - 8839'
Liner SideTrack 342' 3-1/2" x 2-7/8" Uncemented 11178' - 11520' 8890' - 8892'
Perforation depth: measured Open Perfs 11075'-11090', 11098'-1114', 11130'-11150', 11347'-11923',
Ported Liner 11186'-11520', Open Hole Completion 11520'-11923'.
true vertical Open Perfs 8858'-8864', 8867'-8872', 8877'-8883', 8900'-8875',
Ported Liner 8891 '-8892', Open Hole Completion 8892'8875'.
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, TBG @ 29'; 4-1/2", 12.6#, L-80, TBG @ 10922'.
4-1/2", 12.6# 13-CR-80 TBG f/11212'- 11347'.
Packers & SSSV (type & measured depth) 7" x 5-1/2" Baker 'SABL-3' PKR @ 10766'. 7" x 4-1/2" Baker SC-1L PKR @ 11178'.
7" x 4-1/2" BKR FB-1 PKR @ 11212'. 4-1/2" Camco TRDP-4A SLVN SSSV NIP @ 2103' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Averaqe Production or I niection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 02/22/2003 835 33534 0 1336
Subsequent to operation 03/09/2003 922 33628 0 1711
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations __ Oil ._X Gas __ Suspended __ Service
17. I hereby certify that the foregoing is truenand correct to the best of my knowledge.
,~1~'~~~~~ Title: TechnicalAssistant Date March 10, 2003
DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-5174
Form 10-404 Rev 06/15/88 ·
ORIGINAL
SUBMIT IN DUPLICATE
02-16A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
03/01/2003 PERFORATING: DRIFT/TAG
08/02/2003 PERFORATING: PERFORATING
03/03/2003 TESTEVENT--- BOPD: 843, BWPD: 6, MCFPD: 30,161, AL Rate: 0
EVENT SUMMARY
03/01/03
RAN 10'x 3 3/8 DUMMY GUN TO CORRECTED DEPTH OF 11177'. <<<
RETURNED WELL TO POP >>>
O3/02/03
PERFORATE INTERVALS: 11130-11150 & 11075-11090 USING 3 3/8" HSD WITH 6
SPF 3406 POWERJET HMX CHARGES IN TWO RUNS. TIE IN TO SWS MEM
BORAX LOG DATED 22 JUN 1999. DIFFICULTY CONSISTENTLY REACHING
INTERVAL FOR LOWER GUN DUE TO HAW. WHP BEFORE/AFTER SHOOTING
DID NOT CHANGE. <<< NOTIFY PAD OP OF WELL STATUS: LEFT SHUT IN. >>>
03/03/03 TESTEVENT--- BOPD: 843, BWPD: 6, MCFPD: 30,161, AL Rate: 0
Fluids Pumped
BBLS
I PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL (
1 TEST)
1 TOTAL
ADD PERFS
THE FOLLOWING INTERVALS WERE PERFORATED USING THE 3-3/8" HSD HMX 3406-
POWERJET 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION.
03/03/2003
11075'-11090'
11130'-11150'
Page i
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown_ Stimulate _ Plugging _
Pull tubing _ Alter casing _ Repair well _
Perforate _X
Other_
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
329' FNL, 4472' FEL, Sec. 36, T11N, R14E, UM
At top of productive interval
2014' FNL, 3669' FEL, Sec. 26, T11N, R14E, UM
At effective depth
At total depth
1417' FNL, 4590' FEL, Sec. 26, T11N, R14E, UM
5. Type of Well:
Development __X
Exploratow~
Stratigraphic_
Service__
(asp's 687542, 5950868)
(asp's 682981, 5954354)
(asp's 682039, 5954928)
6. Datum elevation (DF or KB feet)
RKB 62 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
02-16A
9. Permit number / approval number
193-116
10. APl number
50-029-20448-01
11. Field / Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
11923 feet Plugs (measured)
8875 feet
Tagged PBTD (6/22/1999) @ 11473' MD.
Effective depth: measured
true vertical
11473 feet Junk (measured)
8892 feet
Casing Length
Conductor 98'
Surface 2967'
Production 9388'
Tieback Liner 845'
Liner 2006'
Ported Liner 342'
Size Cemented
20" 431 Sx PF
13-3/8" 2500 Sx Fondu & 400 Sx PFC
9-5/8" 1965 Sx Class G & 300 Sx PFC
7-5/8" Uncemented
7" 380 Sx Class G
2-7/8" Uncemented
Measured Depth True verticalDepth
98' 98'
3029' 2676'
9450' 7447'
9299' 7257'
11305' 8902'
11520' 8892'
Perforation depth:
measured 11098'- 11114'; (Ported Liner 11186'- 11520'); (Open Hole 11520' - 11923').
true vertical 8867' - 8873'; (Ported Liner 8891' - 8892'); (Open Hole 8892' - 8875').
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 Tbg @ 29' MD; 4-1/2", 12.6#, L-80 Tbg @ 10922' MD; 4-1/2", 12.6#, 13CR-80 Tbg @ 11347' MD.
Packers & SSSV (type & measured depth) 7" BAKER SABL-3 PACKER @ 10766' MD; 4-1/2" BAKER SC-IL PACKER @ 11178' MD.
7" BAKER FB-1 PACKER (BEHIND PORTED LINER) @ 11212' MD; 4-1/2" CAMCO TRDP-4A SSSV @ 2103' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
OiI-Bbl
821
1202
Representative Daily Average Production or Injection Data
Gas-Mcr Water-Bbl
21683 0
25945 0
Casing Pressure Tubing Pre~ure
- 1538
1265
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations ._X
16. Status of well classification as:
Oil __X Gas__ Suspended. -
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ ~I~' ~ Title: DS 2 Surveillance Engineer
Signed /
Brian Carlson
Form 10-404 Rev 06/15/88 ·
Date IJ /1 /O O
Prepared by Paul Rauf 564-5799
SUBMIT IN DUPLICATE
02-16A
DESCRIPTION OF WORK COMPLETED
PERFORATING OPERATIONS
Date Event Summary
10/14/2000:
10/16/2000:
RIH & drifted to 11163' MD (HAW).
MIRU ELU. PT'd BOP/Riser to 3000 psi. RIH w/perforating guns & shot 16' of add
perforations located @:
11098' - 11114' MD (Zone 1)
Used 3-3/8" carrier & all shots 6 SPF. POOH w/guns - ASF. RD ELU.
Placed well BOL & obtained production data.
RECEIVED
t',,,¢V 0 9 2000
AJaska Ch'l & Gas Cons. Corem/ss/on
Page 1
PERMIT DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA_PLUS
Page' 1
Date' 09/29/95
RUN DATE_RE CVD
93-116 5825
93-_116 o~:qgo
93-116 5991
93-I16 407
93-116
93-116
93-116
93-116
93-I1~
93-116
DAILY WELL OP
SURVEY
BHP
CL (CTC)
CNL/GR
MWD-GR
93-1'16 MWD-GR
93-116 MWD'GR
93-116 SBT/GR/CCL
93-i16 SSTVD
93-116
93-116
USIT(C&C)
ZDL/CNL/GR/CAL
~H-CN,i0003-11281
~1933-11357, OH-MWD'GR
L~T~9400-1i307, OH-MWD'GR
~~COMP DATE:lO~S1~93
~/~ 09/07/93-10/31/93
~NADRILL
~000-11285
~0590-10810
~10000-11255
L~MD~9400-!130?
L~ TVD~9400-11307
'~11357-11933
~0000-11110
~/~0000-i1285
-~?000-9280
~I~0000-1!285
10/19/1993
2 02/17/1994
1 02/17/1994
12/14/1993
12/14/1993
12/14/1993
1 10/19/1993
1 12/02/1993
1 10/19/1993
10/19/1993
10/19/1993
12/01/1993
1 12/02/'1993
1 10/19/1993
1 10/29/1993
]. 10/19/1993
Are dry ditch samples
Was the well cored?
Are well tests required? yes
Well is in compliance ~
Initial
,~.OM~ ~EN _ ~
required? yes ~__And received?
yes ~nalysis & description
.~_~eceived? ---ye~---~z~---~
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
RECEIVED
APR 1 2 1995
Alaska 011 & Gas Cons. Commission
Anchorage
NO. 9391
Company:
4/1 1/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
Floppy
Well Job # Log Description Date BL RF Sepia DIR MWD Disk
D.S. 6-9 ~ 95055 CNTD 01 2395 1
D.S. 4-35 ~ 95085 DUAL BURST-TDT-P 022895 1
D.S. 14-3 "'J 94187 REDO CNTD 032894 1
D.S. 2-16A"--J 95147 REDO MWDGR 102394 1
D.S. 1-06 .""J 94399 REDO DUAL BURSTTDT-P 061394 1
D.S. 4-19 95106 DUAL BURST TDT-P 031795 1
D.S. 9-36 BL"---J 95025 MWD GR 1 01 294 I -
D.S. 1-06A'--.J CBT 032495 I 1
D.S. 1-06A"--J CNTG 032495 1 1
D.S. 1-22A '"-J PERF RECORD 033095 1 1
D.S. 4-12'''''-~ CBT 032695 1 1
D.S. 4-12 ~. TUBG PUNCHER RECORD 032395 I 1
D.S. 6-8 ~ PERF RECORD 032595 I 1
D.S. 7-24 ~ PERFRECORD 032695 I 1
D.S. 11-27 '--.3 BASE LINE SURVEY 032395 1 1
D.S. 9-36 BL "'-J MWD GR (MD) 1 021 94 I 1
D.S. 9-36 BL '"J MWD GR (TVD) 1 021 94 I 1
:D.S. 9-36 BL ""--.J MWD GTF (MD) 1 021 94 I I
PLEASE NOTE:
D.S. 14-3 REDO - ORIGINAL WAS MISSING FILE #4
D.S. 2-16A REDO - MERGED TWO PREVIOUS RUNS TOGETHER (JOB # 93560 & 93561)
, oo. w.o,
DATE:
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
STATE OF ALASKA
,~-.....,.
ALASKA '-AND GAS CONSERVATION CC vllSSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed'
Operation shutdown : Stimulate X Plugging Perforate
Pull tubing ~ Alter casing ~ Repair well ~
Other X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510~0360
4. Location of well at surface
332' FNL, 807' FWL, Sec. 26, T11 N, R14E, UM
At top of productive interval
2014' FNL, 1616' FWL, Sec. 26, TllN, R14E, UM
At effective depth
1659' FNL, 1443' FWL, Sec. 26, T11N, R14E, UM
At total depth
1683' FNL, 1453' FWL, Sec. 26, T11 N, R14E, UM
5. Type of Well
Development
Exploratory
Stratigraphic
Service
..,-,.~:-:.?..,~::3 ()ii & ~, .... Cons. Commission
Anchoraae
6. Datum of elevation(DF or KB)
64 RKB feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
2-16A
9. Permit number/approval number
93-116
10. APl number
50 - 029-20448-01
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11923 feet Plugs(measured)
8876 feet
11923 feet
8876 feet Junk(measured)
Casing Length
Conductor 98'
Surface 2965'
Production 9386'
Tieback Liner 845'
Liner 2006'
FL45 Liner Ported 342'
Perforation depth:
Size Cemented Measured depth True vertical depth
20" 431 sx PF 98' 98'
13-3/8" 2500 sx Fondu & 400 sx PFC 3029' 2676'
9-5/8" 1965 sx CIG & 300 sx PFC 9450' 7448'
7-5/8" Uncemented 9299' 7317'
7" 380 sx CIG 11305' 8889'
2-7/8" Uncemented 11520' 8894'
86-11520'; Open Hole: 11520-11923'
measured Ported Liner: 111
true vertical pOrted Liner: 8883-8894'; Open Hole: 8894-8876'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 41' MD; 4-1/2", 12.6#, L-80, PCT @ 10922' MD;
4-1/2", 12.6~, Tubing @ 11347' MD.
Packers and SSSV (type and measured depth) 7" Baker SABL-3 Packer @ 10766' MD; 4-1/2" Baker SC1L Packer @ 11178' MD; 7" Baker
FB-1 Packer @ 11212' MD; Camco TRDP-4A-SSSV @ 2103' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See attached.
Treatment description including volumes used and final pressure
14.
Prior to well operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
1832 2782 42
Tubing Pressure
228
Subsequent to operation
2777 4076 62 -- 222
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil x. Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 10-404 Rev 06/15/88
Title
1119/9 SLW cc: JED, JWP
Engineering Supervisor
Date
SUBMIT IN DUPLICATE
2-16A
DESCRIPTION OF WORK COMPLETED
WELLBORE MILLING & CTU CONVEYED PORTED LINER INSTALLATION
2/25/94:
MIRU & PT equipment. Pumped 190 bbls of Hot Crude fullbore down the tubing for paraffin
removal, w/intermittent shutdowns to surge the well. Rigged down.
3/3/94:
MIRU CTU & PT equipment to 4000 psi. RIH w/CT & jetted Hot Crude down to a restriction tagged at
8250' MD. Jetted several stages of Crude/Diesel/Xylene attempting to pass the restriction. Pumped
389 bbls Crude, 90 bbls Diesel, and 25 bbls Xylene, w/surges, soaks, & a squeeze of Xylene through
the restriction. Got down to 8256' MD, then Shutdown & POOH w/CT leaving Diesel/Xylene at the
restriction for soak. Rigged down.
3/5/94:
RIH & tagged top of hard fill at 8238' MD.
3/6/94:
MIRU CTU & PT equipment. RIH w/CT mounted milling assembly, consisting of a 2-3/8" motor & a
2.7" metal munching bit, while loading the wellbore w/Slickwater, to tag fill at 8243' MD. Drilled
through fill to 8305' MD w/bit #1, then POOH. Swapped to 3.77" tapered mill & RIH to ream hole
& drill on to 8329' MD before bit quit making hole. POOH w/CT. Rigged down.
3/7/94:
RIH & tagged formation sand fill at 8314' MD.
3/10/94
MIRU CTU
from 8326'
& PT equipment. RIH w/CT & jetted 2# Gel & Hot Seawater to perform a fill cleanout
MD, to hard bottom at 8598' MD. POOH w/CT. Rigged down.
3/15/94:
MIRU CTU & PT equipment. RIH w/CT & pumped a total of 800 bbls Slick Seawater & 500 bbls
Biozan Gel, to jet a fill cleanout. Jetted from 8615' to 9777' MD, then fell through to 11362' MD,
& resumed jetting fill to 11370' MD. POOH w/CT. Rigged down.
3/16/94
MIRU CTU
Biozan Gel
& PT equipment. RIH w/CT & pumped a total of 500 bbls Slick Seawater & 290 bbls
w/1% KCI, to jet a fill cleanout. Jetted to 11400' MD. POOH w/CT. Rigged down.
4/8/94:
MIRU CTU & PT equipment. RIH w/CT mounted milling assembly, consisting of a 2-7/8" motor &
3.75" Diamond Mill, while loading the wellbore w/Crude. Milled hole from 11380' to 11553' MD.
POOH w/CT. Rigged down.
4/9/94:
MIRU CTU & PT equipment. RIH w/CT & pumped a total of 500 bbls Crude & 500 bbls Biozan Gel, to
jet a fill cleanout down to 11732' MD. POOH w/CT. Rigged down.
4/10/94:
MIRU CTU & PT equipment. RIH w/CT mounted milling assembly, consisting of a 2-7/8" motor &
3.75" Mill, while loading the wellbore w/Crude. Milled & circulated fill from 11723' to 11918'
MD. Pumped fluids totaling 1300 bbls Crude &450 bbls Biozan Gel. POOH w/CT_...~,Bi,,~~n.
Cons. Commission
Anchora.je
2-16A
DESCRIPTION OF WORK COMPLETED
WELLBORE MILLING & CTU CONVEYED PORTED LINER INSTALLATION
4/11/94'
MIRU CTU & PT equipment. RIH w/CT & pumped a total of 500 bbls Crude & 300 bbls Biozan Gel
w/2% KCI, to jet a fill cleanout down to an obstruction at 11738' MD. POOH w/CT. Rigged down.
4/13/94'
MIRU CTU & PT equipment. RIH w/CT mounted 3"/5.5" underreamer & reamed down to 11742' MD.
Circulated a total of 150 bbls Crude & 700 bbls Biozan Gel. POOH w/underreamer. Rigged down.
4/14/94'
MIRU CTU & PT equipment. RIH w/CT mounted 2-7/8" motor & 3.5" tapered mill. Circulated a
total of 300 bbls Crude & 790 bbls Biozan while milling hole from 11480' MD, o an impassable
obstruction at 11564' MD. POOH w/Mill. Rigged down.
4/26/94 ·
MIRU CTU & PT equipment. RIH w/CT mounted 2-7/8" motor & 3.5" round nose mill. Circulated a
total of 370 bbls Crude & 106 bbls of Biozan Gel while milling hole from 11562' MD, to 11567' MD.
Suspected slow milling progress may have been new hole leg. POOH w/Mill. Rigged down.
4/29/94 - 4/30/94:
MIRU CTU & PT equipment. RIH w/CT & tagged bottom at 11639' MD. Noted several hard ledges in
wellbore during RIH w/CT. POOH w/CT & loaded wellbore w/Seawater. Made up & RIH with a 342'
CT conveyed Slotted Liner assembly, consisting of a 2-7/8" Baker Float Shoe, followed by 12 joints
of 2-7/8", 6.4#, FL-45 Ported Liner, followed by 8' of 3-1/2", FL-45 CT, & a mounted 4-1/2"
Baker SC-1L Packer. Ran to 11523' MD & stuck liner. Attempted to work liner past restriction,
then disconnected, from assembly top & POOH w/CT. Left the liner assembly packer top unseated in
the 7" liner at 11178' MD, and the 2-7/8" shoe at 11520' MD. Rigged down.
5/1/94:
MIRU CTU & PT equipment. RIH w/CT to tag top of liner, then pumped 10 bbls 12% HCI w/10%
Xylene, followed by a CT volume of 2% KCI Water, to dissolve ported liner plug material. Let acid
soak 45 minutes, then pumped another 10 bbls 12% HCI w/10% Xylene, followed by a CT volume of
2% KCI Water. POOH w/CT. Rigged down.
Placed well on production & obtained a valid welltest.
ARCO Alaska, Inc.
Date-
Subject:
From/Location:
Telephone:
To/Location:
P.O. Box 100360, A,._.~orage, AK
Feb 10, 1994 Transmittal #:
ARCO Open hole Magnetic tape(s)
. John E. DeGrey/ATO- 1529
(907) 263-4310
Distribution
94O2O
99510,d~ ~
iWell
· Number
2-16A
I4-47
I9-35A
15-8A
Log Datei Tape Type i Run,
(M-D-Y) Footage
Contractori
10-28-93i MWD:GR i 11933-
~ct0 O\'~ 1~, 3.. 11357
9-18-93 ! MWD:GR i ~1',11307-
5c~J b~ ~ 9400
-26-94 ] D~VAC/CNIGR ~ 11132-
,~l ~0~ ~ 12072
3-18-93 ~ ,CD~CD~GR j 10387-
~3 ~c~ F~ ~ 9550
10-29-93 ~ MWD: GR ~ ~, 10725-
~q ~ ~ ~ ~ 7450
Sch
Sch
Atlas
Sch
Sch
Number of Records:5
PBOE Document Control
Distribution: Bob Ocanas
BPX
State of Alaska
Phillips
Exxon
Please acknowledge receipt by signing and returning a copy of transmittal.
ARCO Alarm, Ine, I$ · 8ul~k~ry of AtlantlcR~chfleldComl:~ny
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COM,VllSSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] ~ [] ABANDONED [] SERVICE []
Operator 7. Permit Number
2.
Name
of
ARCO Alaska,/nc. 93-116
3. Address B. APl Number ' ,/",/~
P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20448-01
4. Location of well at surface 9. Unit or Lease Name
4948'NSL, 807'EWL, SEC. 36 T11N, R14E ~'-:.~:~ ........ ~~ ~ ~Tj,.~.~.=.~ ~ Prudhoe Bay Unit
At Top Producing Interval ~ '~i~-~ ~~ ~~' .... :~:~' 2-16A '
3109' NSL, 3669' WEL, SEC. 26, T11N, R14E '~ ~'~- '-~'~Y~ ~i Ii~_~ '~..~.~ ~ 11. Field and Pool
At Total Depth i .~. Prudhoe Bay Field/Prudhoe Bay Pool
3869' NSL, 4595' WEL, SEC. 26, T11N, R14E '.' .....
5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Sedal No.
KBE = 58. 76' I ADL 28308
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
9/10/93 9/23/93 10/31/93I N/A feet MSL J One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey ~0. Depth where SSSV set 21. Thickness of Permafrost
11933'MD/8877' TVD 11933'MD/8877' TVD YES [] NO []! 2103' feet MD 1900'(Approx.)
22. Type Electric or Other Logs Run
CH T/GR/CNI_/ZDL
23. CASING, LINER AND CEMENTING RECORD
SE'I-I'ING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 94~ H-40 Surface 98' 32" 431 sx PF Cmt.
13-3/8" 72# N-80 Surface 3029' 17-1/2" 2500 sx Fondu/400 sx PFC
9-5/8" 47# L-80/Soo-95 Surface 9450' 12-1/4" 1965 sx "G"/300 sx PFC
7-5/8" 29. 7# NT-80 8454' 9299' 9-5/8" Uncemented
7"' 29# NT-aO/13CR 9299' 11305' 8-1/2" 380 SX Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD} PACKER SET (MD)
No perforations-MD open ho~_DrOduction 4-1/2", L-80 10922' MD 8454'& 10766'
11347'- 11923' 8899 '-8877'
26. ACID, FRACTURE, CEMENT SQUEEZF_, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production JMethod of Operation (Flowing, gas lift, etc.)
10/26/93 I Gas Lift
Date of Test Hours Tested PRODUCTION FOR DIL-BBL GAS-MCF WATER-BBL CHOKESIZE ~GAS-OIL RATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
Form 10-407
Rev. 7-1-80
~INUED ON REVERSE SiDE
Submit in duplicate
,'9. 30.
GEOLOGIC MARKERS F~.,, .MATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEFTH GOR, and lime of each phase.
Sag River 10360' 8285'
Shublik 10403' 8324'
Top Sadlerochit 10480' 8393'
31. LIST OF ATTACHMENTS
Anchorage
32. i hereby certify that the foregoing is true and correct to the best of my knowledge
Signed .J-~.~. ~ l,tle Drilling~no_ineor$~oor~[$or ~ate
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain,
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: DS 2-16A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 09/06/93 11:00
SPUD: 09/10/93 02:30
RELEASE:
OPERATION:
DRLG RIG: NABORS 2ES
WO/C RIG: NABORS 2ES
09/07/93 (1)
TD:11233
PB:10720
09/08/93 (2)
TD:11233
PB:10720
PULL TBG. MW: 8.5 Seawater
MOVE RIG. RIG ACCEPTED @ 11:00 HRS, 9/6/93. DISP DIESEL
F/ WELL. REV CIRC. MONITOR WELL. CIRC. WELL STABLE.
SET BPV. N/D TREE. N/U BOPE. TEST BOPE. M/U LAND JT.
PULL HGR TO FLOOR. POOH, L/D 4-1/2" TBG.
RIH. MW:10.0 WBM
L/D TBG. TEST BOPE. RIH W/ BP. SET BP. SHEAR OFF. TEST
CSG. DISP WELL TO MUD. POOH. RIH W/ SECTION MILL.
09/09/93 (3)
TD:11233
PB:10720
09/10/93 (4)
TD: 9500' ( 0)
09/11/93 ( 5)
TD:10078'( 578)
09/12/93 (6)
TD:10453' ( 375)
09/13/93 (7)
TD:10780' ( 327)
SET KICK OFF PLUG. MW:10.0 WBM
RIH W/ SECTION MILL. CUT WINDOW F/ 9450'-9500'. CIRC.
POOH. RIH W/ MULE SHOE. WASH F/ 9446'-9610'. POOH 1 STD.
REV CIRC. LAY CMT KICKOFF PLUG.
DRLG. MW: 9.8 VIS: 68
POOH. CIRC. POOH. CLEAN & TEST BOPE. RIH W/ BHA. TEST
MWD. NO GO. POOH. CHANGE MWD. RIH. WASH F/
9190'-9306'_ DRLG CMT F/ 9306'-9455' KICK OFF @ 02:30
HRS' 9/10/93. DRLG F/ 9455'-9500'.
DRLG. MW: 9.9 VIS: 54
DRLG TO 9609'. SHORT TRIP TO SHOE. CHANGE OVER TO XANVIS.
RIH. DRLG F/ 9606'-9984'. SHORT TRIP. DRLG TO 10078'.
DRLG. MW:10.0 VIS: 64
DRLG TO 10297'. CBU. POOH. CHANGE BIT. RIH. REAM F/
10192'-10297' DRLG F/ 10297'-10453'.
POOH. MW:10.0 VIS: 65
DRLG TO 10780'. SHORT TRIP TO 9410'. CBU. POOH.
09/14/93 (8)
TD:10866' ( 86)
09/15/93 ( 9)
TD:l1056' ( 190)
RIH. MW:10.0 VIS: 60
CHANGE BHA. RIH. WASH F/ 10699'-10780' DRLG F/
10780'-10866' CIRC. POOH. WORK ON MWD. RIH.
WASH TO BTM. MW:10.0 VIS: 60
MAD PASS F/ 10761'-10866'_ DRLG F/ 10866'-11205' CIRC.
SHORT TRIP 3 STDS. DRLG F/ 11025'-11056' CBU. POOH.
CHANGE BHA, BIT. RIH.
WELL : DS 2-16A
OPERATION:
RIG : NABORS 2ES
PAGE: 2
09/16/93 (10)
TD:l1056' ( 0)
09/17/93 (11)
TD:ll126' ( 70)
09/18/93 (12)
TD:11276' ( 150)
09/19/93 (13)
TD:l1307' ( 31)
09/20/93 (14)
TD:11307' ( 0)
09/21/93 (15)
TD:l1307
PB: 0
09/22/93 (16)
TD:l1307
PB: 0
TEST BOPE. MW:10.2 VIS: 63
WASH TO 11056'. ATTEMPT TO DRILL. NO GO. CBU. POOH.
CHANGE MOTOR, MWD. RIH. WASH TO BTM. ATTEMPT TO DRILL.
NO GO. PUMP ALDICIDE IN MUD. POOH. L/D MOTOR, MWD.
INSPECT SAME. TEST BOPE.
POOH. MW:10.0 VIS: 72
TEST BOPE. RIH'W/ NEW MOTOR. WASH F/ 10927'-11056'. DRLG
F/ 11056'-11126'. LOST 300 PSI. POOH. FOUND WASHOUT IN
MWD TOOL.
DRLG. MW:10.0 VIS: 74
CHANGE MWD, JARS. RIH. WASH F/ 10280'-11126'. DRLG F/
11126'-11276'
CIRC. MW:10.0 VIS: 98
DRLG TO 11307' CIRC. 2 SHORT TRIPS TO SHOE. CIRC.
POOH. L/S BHA. RIH W/ BHA. WASH TO BTM. CIRC.
LOGGING. MW:10.0 VIS: 98
SHORT TRIP TO SHOE. CIRC. POOH. L/D BHA. R/U ATLAS.
LOG RUN: CHT/GR/CN/ZDL. RIH. LOG F/ 9450'-11289' LOG
F/ 11298'-11074'.
POOH. MW:10.1 KCl
LOG F/ 11289'-10000' POOH W/ W/L. R/D ATLAS. POOH. L/D
LOGGING TOOLS. RIH. WASH F/ ll060'-BTM. CIRC. SHORT
TRIP TO 11060' CIRC. POOH.
RUN LNR. MW:10.0
RIH. CIRC. POOH. L/D BHA. RIH W/ 7" LNR ON DP.
KC1
09/23/93 (17)
TD:l1307
PB:11263
09/24/93 (18)
TD:l1307
PB:11263
09/25/93 (19)
TD:11357
PB:11357
CLEAN OUT CMT. MW:10.2 KCl
RIH W/ LNR ON DP. CIRC. RIH W/ LNR. CIRC. PUMP 100 BBLS
ARCO ALPHA SPACER, 80 BBLS 15.7 PPG 'G' CMT. DISP W/ MUD.
BUMP PLUG. SET LNR HGR W/ 3000 PSI, LNR TOP PKR W/ 4000
PSI. RELEASE F/ LNR. REV CIRC. POOH. TEST BOPE. RIH W/
BIT, BHA. CIORC. TEST CSG, LNR TOP PKR. CLEAN OUT CMT F/
11192'-11263 (LC).
RIH W/ PKR, TAIL ASS'Y. MW:10.0 KCl
DRLG CMT, FLOAT EQUIP TO 11357'. CBU. POOH. RIH W/ BHA.
TAG BTM @ 11357'. CBU. POOH. L/D BHA. RIH W/ PKR, TBG
TAIL.
LOGGING MW:10.0 KC1
RIH W/PKR & TAIL ASSY. CIRC, SET PKR. DISPLC W/SW. LDDP. RU
WIRELINE & RUN CMT LOG.
WELL : DS 2-16A
OPERATION:
RIG : NABORS 2ES
PAGE: 3
09/26/93 (20)
TD:11233
PB:10720
09/27/93 (21)
TD:11357
PB:11357
TEST ANNULUS MW:10.0 KC1
RD WIRELINE. PU TAIL ASSY & PKR, RIH. MU HGR & LDNG JT.
TEST. SET PKR. TEST TBG & ANNL. ND, NU BOP & TEST. PULL
BPV. OPEN SSSV, TEST TBG. TEST ANNLS.
LD TBG MW:10.0 KC1
INSTL BPV. ND TREE, NU BOP, TEST. RU WIRELINE, CUT TBG. LD
HGR. & TBG.
09/28/93 (22)
TD:11357
PB:11357
09/29/93 (23)
TD:11357
PB:11357
POOH. MW:10.0 KC1
POOH. L/D TBG. RIH W/ BHA. TAG STUMP @ 10700'. ATTEMPT
TO LOAD JB F/ 10700'-10731' POOH. RIH W/ BHA. POLISH
TBR @ 9300'. POOH.
POH
POH, LD MILL. FOUND LEAK IN CSG. POH.
MW:10.0 KC1
09/30/93 (24)
TD:11357
PB:11357
10/01/93 (25)
TD:11357
PB:11357
10/02/93 (26)
TD:11357
PB:11357
POOH. MW:10.0 KC1
POOH. L/D BHA. RIH. RELASE K-ANCHOR. POOH. L/D FISH.
RUN USIT/GR. RIH W/ BHA. REV CIRC. RIH TO 10709' WASH
& REV CIRC TO 10762'. POOH.
RIH W/ LNR. MW: 8.5 Seawater
POOH. L/D BASKETS. TEST BOPE. RIH W/ BHA. POLISH TBR F/
9300'-9306'. CBU. POOH. L/D BHA. RIH W/ BHA. STING
INTO TBR. TEST ANNULUS. POOH. RIH W/ 7-5/8" SEAL ASS'Y,
7-5/8" TIEBACK LNR ON DP.
RUN TBG MW: 8.5 Seawater
RIH W/LINER. POH. RIH W/SEAL ASSY. TEST PKR. LDDP. RU & RUN
TBG.
10/03/93 (27)
TD:11357
PB:11357
PULL BPV MW: 8.5 Seawater
RUN TBG. TEST TBG., SSSV. RU & LAND TBG. SET BPV. ND, NU,
TEST HGR SEALS. TEST TBG. FREEZE PROT. SECURE TREE. RIG
RELEASE 10-02-93 22:00 HRS.
SIGNATURE:
(drilling superintendent)
DATE:
RECEIVED
DESCRIPTION OF WORK COMPLETED
POST SIDETRACK CTU WELLBORE EXTENSION DRILLING DFC
Alaska 0~1 & Gas Cons. Commission
I 0 / 1 0 / 9 3: Anchorage
MIRU & PT equipment. RIH w/CT mounted jet basket & tagged RHC plug at 10907' MD. Reciprocated
42 bbls biozan, then POH w/sand, metal shavings, & packer rubber pieces in basket. RIH w/grapple
while circulating biozan & slickwater to 10900' MD, but couldn't latch plug prong. POH w/grapple,
then ran jet basket to 10900' MD while reciprocating slickwater. POH w/junk filled basket. RD.
10/12/93:
MIRU & PT equipment. Made runs w/CT mounted jet basket & reciprocated slickwater above RHC
plug, to recover additional junk in basket. RIH w/CT & jetted a fill cleanout w/biozan & slickwater
until clean returns. POH w/CT & ran grapple to latch & POH w/RHC prong & plug. Rigged down.
10/18/93:
MIRU & PT equipment.
10700' MD. POH w/tools.
Ran CT Memory Directional & GR Survey from PBTD at 11357' MD, to
Rigged down.
10/21/93 - 10/30/93:
MIRU 2" CTU & RU Drilling platform. PT equipment. Made up & RIH w/BHA consisting of a 3.75"
Diamond Bit, Floats, & Motor section, followed by two Collar sections, followed by an Electronics
section, followed by a Coil Connector, Hydraulic Disconnect, Circulating Sub, Checks, Non Rotating
Connection, & Jars, mounted on 2" CT. Tagged PBTD at 11357' MD, & started circulating 2# Xanvis
@ 2.3 bpm. Began drilling & increased Xanvis to 2.8 bpm. Drilled horizontal hole w/occasional
motor stalls & stops for surveys, to 11470' MD, where MWD signals ceased. POH BHA #1. Replaced
assembly components, then RIH w/BHA #2 & drilled to 11606' MD. Had 4% - 60% fluid loss rates
to formation from 11488' to 11507' MD. PUH to 11179' MD & flowed well with A/L for several
hours to lift cuttings from wellbore. Reconditioned gel w/FLA, then RIH & resumed drilling
horizontally from 11606' to 11690' MD. PUH to 11100' MD. Shutdown A/L gas & SI well to RU
hardline. Flowed well a few hours, then RIH to bottom & resumed drilling to 11717' MD, while
flowing well with A/L. Backreamed tight spots, then RIH to bottom pumping gel & drilled to 11724'
MD, where drilling broke from 4 fph to 100 fph. Ran GR survey, & backreamed hole up to 7" casing.
SI A/L & pumped Meth Water to FP surface pipes while repairing PTS skid. Flowed well. RIH from
11180'& displaced Meth Water w/Xanvis. Tagged bottom & resumed drilling to 11850' MD. ROP's
averaged 70 - 80 fph, & surveys indicated a 95.6 degree hole at 11756' MD, & 96 degree angle at
11846' MD. Logged GR through new hole, then POH. SI A/L, & flowed well while making up new BHA.
SI well at choke, SI SSSV, bled down, & ran new BHA. PT new assembly OK, opened SSSV & started
A/L. Circulated Xanvis & resumed drilling. ROP broke at 11854' MD to 200 - 220 fph. Surveyed at
11864' MD @ 93.9 degrees, & 11905' MD @ 91 degrees, while averaging 57 fph. Switched to clean
gel at 11924' MD & saw big drop in circulating pressure to 2900 psi; old gel had -1% solids. Drilled
to 11933' MD, then PUH to tubing tail, circulated 15 bbls Meth Water, & shutdown pump for repairs.
Disposed of recycled gel, washed tanks, & reloaded clean gel. Started pumping gel & RIH from 11158'
MD & reamed tight spots from 11770' to 11915' MD, where BHA stuck. Dragged BHA up sticky hole
to casing shoe, then POH. FP CT w/Meth Water & removed BHA. MU & RIH deploying 10 joints of
2-7/8" x 30' pre-perforated liner to be conveyed on CT. Slips improperly released between makeup
of liner joints 9 & 10, resulting in 9 joints (226.53') of liner dropping down hole. RIH w/spear &
tagged box end top of fish at 11105' MD. POH w/spear packed off w/sand & cuttings. No recovery of
fish. Rigged down. Flowed well.
10/31/93:
MIRU & PT equipment. RIH w/CT & jetted Xanvis to perform a fill cleanout above fish, then POH to
makeup & run fishing tools. Latched & POH w/all of fish. Rigged down.
Placed well on production w/gaslift & obtained several valid production tests. Flow rates have been
testing consistently at 2400 - 3000 BOPD, 0 BWPD, & 1000 - 1800 GOR. All production is from
the open hole section of the wellbore, & plans to run the pre-perforated liner have been placed on hold.
RECEIVED
DEC 1 4 1995
Oil & Gas Oons. CommissWn
Anchorage
7447,00
~.~ ~r.
3i5.00
3i~.~
-4162+12
Date
f't f; ft ft '- - d~-----
?450:¢9 v,u 7:.-7."',g
.-x :'-. : :.. -.,- .~L-2-D,O.~ -.- ~'~-~ --
'-~,~':' '~-"' I".--'-";,'~ 7620:7?.- 5323,0'~ ZZ,v2. '=7':- :&' ,~:e..,,.::,
':.~'7{~:70 61,3 7,~7--'".5~ 5346,02 22,:-' 7 306,06 3';50,7;~
YO':,:-~ :"" .... '";v gS,Z' -"/166: ~!
"'
99:35.2'~-',
i02C~.,90
102~7,50
8025,,50 ~ .6'-, 21,20 308::_;3 .q::-':%, 2"..'
80.?.3.,~: 5504,60 2~,4.'_,' 3~,.",.~_2 ..... ,:,s..-'," .... 72
Bi~3,i~ 552.r.'., 8q 23,03 307, ?".;' 3._--63,37
"~-~' .... 5~:~;--r'-v 24,37 "" l~; ~-"": ~'"'
OL£F ~¥'--'- __,..,...,.u,., C;-' £e ~%:,C.: J~'7
.
2,5',2
't :.5z.
105~9,70
',4"2,2 8396:74 -z,? ....... --: ~.-, o ,...,',c..
?,2. 0,~.;-~.. .,,. ~ %72,7:;; ~,u~ .... 3';2,51 3-~58,. !5
2-3-'-,5: c ........... 3~ -"'. &;. ""~,12
c~.,-' _'--,.e.~ 56~,2',98 ze., ~Z ..... ~'-:-.~
"0,."' - .... '='7" ' "~' 26,22 309,5r~ 3485.8.'-5
,,, ,-' 8%4-- -_-Z3
1070340
]V.,' C:7
10820,37
3,"",7' 8566,0.,? ~?gg,~,t c--~ ~v '"'"',,2/ """":
........ . ..... -._. ,:: "- - ,,.'-~"~,97
c,~,~ 8593_-.0';' 57~Z.,~g 2.6,.'-~3 ~'-~,¢;
66,2 &4.-'_:B,93 5783,22 27,79 ~.:--'9,:'.- 3530,,22
· '"-~ '"~ b/'.*.~, _?~ 35,3,~- 2,%,..,",5 ....
3i,1 8o=..:-..,,..L --"'""-'" '"" . .... :~5,.,.,,,.c.-,
.... &..- ,: :-, % .... :, .... ,.. 40,37 .... "'
dR-(-: ,-~----. ',.' KeOr, "'9 ..... * ~_,z.-~::.
35,g o'*.-'~ =~ %R4-'--,qg 44.2'-i aaa ',~,;, "-'
~ .
:..:7,8 ~.7/,.7,84 ~.~z.,. o,', 47 ~v'-. D[."7,26
,~l,Z &t40~.nr--: '",""'~" "' 59,92 ~' .........
"' '" ¢,Jt,, ¢~-
..... .i _,_ . -.~.- ~-' 2 ~ --',,'- '-"--"£-"' +
12,74
1.!!57.00
-4727,56 ~"' '" '::' 3'."':7,6[-~
· ~ 7C.-' * -... ~ -
-4748:9:3 5772,91 3fj7,5'?
-4766,r-'' 60 !.,.'.', ,,';..':.~ "'"' ':"
._,..' . ¢,~..' ~ .: ·
-~0-'- --~, .'3 ,-.?. --,r, .~.:'.'7
l!, .'.:-'2'
14 ,,27
1~ ,Oq
14,27
-~.:.*.. :,~/ 6'.' 32,";'9 307,,53
-,q,?..75,95 6: 45. ¢.? 307.5t
_ 4-.'..2'a. 18~. !.:.,z, 6-6 ',-',
"':'? "'" 6i87,0'.',' 307.5,1
-47,,..',,;,:. 4G 622':2,.08
-4'73~. :~..- ...--.
~0_.C 3
7,74
8
14 .. 22.'.
14,2.,.;
~,.',x~.,~*** AN~I:',ILL **********
*******--*********--***----********
CO~P~
~LL NAME DS 2-~.6A C~
LOCATIOn,! ~. PI~HOE BAY~ NSB
LOCATION 2 ALASF~
~TE: 2~-0CT-93
MAL"~T]C D~LIi~ATION
~2. ET
~ ~b INC_CHG CL~I~_CHG I_RA~ AZ~_C~ CL~AZ~_CHG TL~_RATE CCOSL~E ?OOC_~AC~ ])CS DCSRT
ft ft de~ d~a deg/tOOft deg dq deg/lOOft ft dq. deg/lOOft dq/lOOftwK2
113~,0 8901,00 0,00
11398,0 8899,8? 2.50'
11433.0 8~96,93 4,10
11~7o0 8,894.06 -4,10
11505,0 8893,56 -4,10
0.00 0.00 0.00 0.00 0,00
2,50 6,10 1.40 1.40 3.41
6.60 11.71 0.10 1,50 0,29
2.50 -12,06 -0.20 1.30 -0,59
-1,60 -10,79 -1,60 -0,30 -4.21
106,83 0.00 0,00 0,00
106.35 29,22 6.%' 17.04
105,49 1,37 11,72 13.51
104.~ 177,19 12,07 1.05
0.00 0,00 11,58 1,29.
11545.0 8894.82 -biX)
ll~S,O 8855.41 1.20
11c[44.0 8895.65 1.50
11643.0 8855,00 1,I0
11~.40,0 8893,~ 2.30
-2.60 -2.50. 2.30 2.00
-1.,!0 6.00 -0,50 1.50 -2,50
0,10 3.85 3,10 4.60 7,95
1.20 2.82 1.80 6,40 4.62
3,50 6.22 1.20 7,60 3,24
103.80 113.54 6.2,7 13.29
103.20 22,/~1 6,50 1.17
101,14 M.19 8.83 5,97
97,43 58,55 5.41 8,77
104.37 158.67 7.01 4.33
11702,0 8891.62 1.10
11720.0 B889,98 0.70
11750,0 88~,89 0.60
11784.0 8882.95
11810,0 8879.97 -1.00
4,60 5,00 0,00 7,60 0,00
5,30 3,89 -0,10 7,50 -0,~
5,90 2,00 -1,70 5,~0 -5,67
6,80 2.65 -I,~ 4,20 -4,71
5,80 -3,85 0,20 4,40 0,77.
90,05 0,00 5,00 9,14
87,71 8,04 3,93 5,95
84,27 70,38 5:,98 6,84
81,34 60.38 5.37 1.79
92,94 27,49 3,92 5.58
11828,0 8878.40 -2.20
11864,0 8876,86 -2,90
11933.0 8876,~.
3.60 -12.22 -0,I0 4.30 -0.56
0.70 -8.0~ -5.10 -0.80 -14,17
-1 ;30 -2,~- -3,50 -4.30 -5,07
78,07 177.48 12.~ 4~,19
76.99 119.52 16,28 11.25
80.10 119.74 5.~ 15.13
HOTE: SLT~¥ ! 11933' I5 ~ AT Ti l~IT,
********* ANADRIi]. **********
********~ SCHLUMBERGER *********~
COMPANY ARCO
WELL N~d~E DS 2-16A CT
LOCATION 1 PRUDHDE BAY.~ NSB
LOCATI~ 2 ALASF, A
MAGN~IC DECLINATION 30.01
~-0CT-93
WELL NUMBER 0
WEE H~.~D rLOCATION: LAT(N/-S) 0,00
AZIML~ ~M RQTARY TABLIZ TO TARGI~'T IS
TIE IN F~DINT(TIP) :
~AS~ED D~H
TRU~ V~eT ])k'{=q~{.
INCLINATIC~
AZIMUTH
LATITUDE(N/-S)
DEPARTL~:E(~/-W)
1135-F.00
8901,00
308,50
38,21,0<,
-4970,00
D~'(E/-W) 0.00
308,53
~,~sY~ ~\ & ~s4k~~l~°~g~c~°~s'
~2
M~A~_~D INTER~qL VEE%Ir-~4L TAE~91'T ~ATIOH AZIMUTH
D~'TH D~ S~TI~ I~LN,
ft ft ft ft d~ d~
!1~,00 0.0 8~i.~ 62~,14 ~.~ 308,50
I1~8.~ 4t.0 88~'.87 ~C4'.I1 f~.~ ~.~)
114~.00 35,0 8B~6.~ 6~3.~7 ~6,~0 310.00
LATITUI]£ D~'A'~qtJRE DISF'~ mt
hV-S ~!-W
ft ft ft
321.00 -4970.~ 6269
3046.90 -500i,76 E~10,01
3669,2~ -~28.49 63~,8S
~91.02 -~4,47 ~J78,6~
2914,~2 -~,~ 6416,67
11545.~D 40.0 ~94,62 6455,79 87+70 310,50
11565,~ 20.0 OB'~.41 6475.77 88,90 310,00
11./<u:l.O0 39.0 88_,95,65 6514,7i 9~0.4~ 313.10
11643.00 39,0 6895,00 6553,53 91.50 314.90
11~,00 37.0 6893,~' 6590.2I ~3,~ 316,10
AZIMUTH
deq
~7,55
307.56
307o~
307,59
307.60
11702.00 ~.0 6891,62 66II.96 94.90 316,10
11720.~2, 16.0 8889.98 6629.73 ?~,EY.,' 316,00
117~2,~00 30,0 ~6.89 ~59,37 96.20 314.~
117~,~ ~.0 ~2.~ ~,0i ~'7,10 312,70
11810,00 26,0 687?.97 6718.~ 96,i0 312,~
2940,27 -5114,91 ~,63 307,61
2953.I9 -5130,17 6476.60 307.62
3979.05 -5159,35 6515,50 307.64
4006,14 -5187o40 6554,~ 307.66
40~.50 -5213,30 6590,87 307,72
11626,00 1(i,0 8676.40 67~,,65 93.90 312.80
II864~00 36,0 ~76.86 6772.S8 91,00 307,70
11923,~ 69,0 6876,~. 684i,S0 89.00 304.20
de~
lOOft
0,~
6,99
11.72
12.07
1I,~
NDIl~: S~q~ 8 IW33' IS PRD~ AT THEBIT.
6,27
6o~0
8,83
5,41
7,0i
4048,30 -5~8,51 ~12,57 307,~
4~1,21 -5240,95 (6.~,31 307,77 3,93
4082,36 -5262,00 6659.90 307.81 5,98
4105,6I -5286,49 6693,.S0 307,83 5.37
4123.16 -5305,44 6717,~ ~,7.&5 3,~2
415~,35 -5318,59 6737.10 207,87 12,23
4158.58 -5346,03 6773.02 307,86 16,28
41,~,06 -S401,87 6841.96 207,~ 5¥84
ARCO ..a.l. sk,, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 11-24-93
REFERENCE:
~/.~ll~ * 2-16A
//12-16A
~---lq'~ (~ 12-16A
~ 12,16A
~12-16i
12-16A
ARCO OPEN HOLE FINALS
10/22-28/93 MWD: GR' ~l'bS?-~tq53
10-23-93 ~SSTVD 3.30'L-q,53 q Run
10-23-93 DLL/MLL/GR/SP Run
10-23-93 ~ BHCA/GR 3~Z-951~ R-_n
10-23-93 ~CNL/GR 3'3~-ffqS? R-n
10-23-93 ~BH Profile Run
10-23-93 ~Water Saturation Run
1 5-8A 10-20-93 ~~zzSSTVD
5-8A 10-20-93~,-~- %z~/DLL/GR/SP Run
/ 15-~ 10-20-93 7~-~7~C~/GR R~
- ~ / ~5-~ 10-20-93 7~o-~7~7/~D~/C~/G~/~ R~
~ ~ 1~ 5-~ 10-20-93 /~ ~ome 7~-~~ 1, 5"
'~* 15-~ 10/~29/93 ~: GR ~~-lo~zS 2"&5"MD
**~ 15-~ 10/~29/93 ~: GR 7~~]~7Z~ 2"&5"~D
***~15-~ ~ 10/~29/93 ~L 7~ ~1o7~ 2"~
*** k15-~ 10/~29/93 ~Sp~ ~g 7~5~- ~o?a5 2"~
8-23A ~-13-93~L50~0~S~ R~m 1, l"&2"
-23A 13-93~Z~-%f~ C~/GR R~n 1, 2"&5"
}ql 11 13-93 ~;~9~ ~ ~offie R~ 1, 2"~"
2"]~D
1, 1"&2"
1, 2"&5"
1, 2"&5"
1, 2"&5"
1, 1"&2"
1, 2"&5"
1, 2"&5"
1, 2"&5"
Please sign and return the attached copy~as rece. ipt'~.~ .'-/~ ~.°f data.
RECEIVED BY ....... ~.,.o,~_u~__.~~J-
uo~ss~tumo9 ;suoo s~9 ~ I!01
Have A Nice Day!
APPROVED___.~/~_
Trans# 93142
# PHILLIPS
# PB WELL ~
# BPX
# STATE OF ALASKA
# TEXACO
The correct APl# for 2-16A is 50-029-20448-01.
The correct APl# for 15-8A is 50-029-21180-01, and this is
a MD not a TVD log.
The correct API# for 15-8A is 50-029-21180-01.
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 10-21-93
REFERENCE:
DEC 0 ?
Alaska Oil & ~as Co;~s
Anchorag-e' CommiSSion
ARCO CASED HOLE FINALS
[ 16A 9-25-93 SBT/GR/CCL I~ao-I ilIo Run 1,
16A 9-26-93 Collar ¢c-m~ ~os~o-[o~l 0 R~ 1,
3-29 9-19-93 ~uc~on ~t0o-fig~ff R~ 1,
4-1 9-23-93 C~ ~ ;~-~ R~ 1,
4-4 9-17-93 Pe~Record ~%-~e~o R~ 1,
4-7ST 9-19-93 Pe~Record ~o-~z~ R~ 1,
4-8 9-23-93 ~j ~offie]e?~0l~em~)~.]~n~~ 1,
3~q$ 4-16 9-13-93 ~ ~tect/~,~-Pt ~.e~i s a R~ 1,
9-5A 9-16-93 ~ucflon/sa~}W~,-re],~ R~m 1,
9-29 9-15-93 ~k Detect]r~$]7~l,~,n R~ 1,
/9-35A 9-17-93 Pe~Record ~lb~ll~ R~ 1,
~9-35A 9-18-93 Pe~ Record fiq!k-~io?g R~m 1,
Xg-35A 9- ! 9-93 ~od ~offie 1 s~ n 1~~ R!!n 1,
9-42 9-14-93 ~od ~offie l~zi~*~/~ R~ 1,
~0~LG 9-44 9-15-93 ~od ~0ffie[~?~ R~ 1,
/12-22 9-25-93 Jewe~ lCaicca R~ 1,
k12-22 9-26-93 Pe~Record ~q00-q~o R~ 1,
12-30 9-22-93 POG~ ~t/~G ~ch R~ 1,
7~-53 14-4 9-24-93 Pe~Record librettist1 R!!n 1,
14-31 9-20-93 ~oducflon ~-q~0 R~ 1,
15-2 9-14-93 ~od ~offie]~i~]ea R~ 1,
9z-~ 15-18 9-21-93 B~er ~~ble Packer R!!n 1,
?Z->a 16-29A 9-24-93 ~oducflon/~l~l~}~ R~ 1,
~g-2~ 17-12 9-22-93 ~uc~on]~nl~~~~ 1,
~5 18-25 9-20-93 ~od ~offie ~o~zq~o R~ 1,
5" Atlas
5" Sch
5" Sch
5" Sch
5" Sch
5" lu 0~ ~05~Sch
2" ~-lo~q~ Sch
1"&5" Sch c-I
1"&5" Sch ~-~oe~
5" Sch
5" Sch
1',&5" .Sch
5" ~~ Sch
5" I~l~b-ll[~ Sch
5'N~0~r~Z Sch
5" Sch
5" ,z~o - ~ Sch
5" Sch
5" Sch
5" l~lo~ Sch
5" I ~-~5o Sch
5,,5~-t~ZSch
5" 2l~11~ Sch
5" Sch
Have A Nice Day!
Sonya Wallace
ATO-1529
Please sign and return the attached copy as receipt of data.
RECEIVED tl¥____ ~ __/1.~ ~,~,..~_.~__ ~~-~
/
Trans# 93118
# CENTRAL FILES
# CHEVRON
# BPX
# STATE OF ALASKA
# PtHLLIPS
# LILLIAN TIULANA
# EXXON
# MOBIL
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 10-22-93
REFERENCE: ARCO ~FINALS
1-19 ~10-1-93
1-22 ~;1- I-~[ "10-1-93
1-29 / 10-8-G3
2-16A ~ ~9-29-93
3-9 -~10-6-93
3-29 9cf-~ 7:~ -'10-6-93
3-31 -~10-5-93
3-32 ~o'q~ o'7 ~10-5-93
3-33 ~10-10-93
4-4 '/[-\~ -/10-9-93
4-12-/ 10-2-93
4-24 c3%- '~0[ v~10.10.93
6-12A ~- (~q ~9-29-93
I/9- ~) 6-13 10-1-93
7-5 775-i ~ 10-6-93
-28 10-9-93
-28 10-9-93
9-11 7/~~ ~ ~'10-4-93
9-13 /10-3-93
9-20 ~7-q ~ ~ 10-7-93
~ ~11-16ST ~10-1-93
12-22 3~LoO "9-28-93
/13-2o o-2-93
~, 13-20 ~10-10-93
14-3~ ?~-~-25-93
14-3~ ~-28-93
14-32 ~10-2-93
15-22 ~~ ~9-30-93
16-17 ~ 10-8-93
16-22 ~0~ ~10-10-93
17-15 ~10-8-93
17-16 ~Z~ ~0-3-93
Perf Record Run
P_e~tf_Raa~d Run
USIT ~¢tw~e~"r t~0~ ~. ,Cotor Run
Perf Record It[~9-~-L7 Run
Perf Record ~ -~ R~
Completion R~
Pe~ Record R~
Inj ~offie J~~l~l~
~ak ~tect/~~J~/c~ R~
Perf Record tlOoo~t~ R~
Perf Depth Control/~o~,/caL.
Completion
Leak Detect I
~Prod Profile/~
/Completion
~Prod Profile/i~ ~ I~ i~Sl ~amb
v~Dual Burst TDTP
Leak De tect/~haJ T~[?~ l~ P-
Leak Detect (E~Tc,~]
Inj Profile 15~,~
Dual Burst TDTP
Patch Setting
Inj Profile
C~Ta/~R/CCL
HLDT/~
Prod Proffie/
Completion
Completion
Prod Proffie
Inj
Production ~m
Please sign and return th~ attached copy as rqceipt of data.
RECEIVED BY ~
Have A Nice Day!
Sonya Wallace
ATO-1529
# CENTRAL FILES
# CHEVRON
# BPX
# STATE OF ALAS~
The correct A/I# for 1-22 is 50-029-20848-O0.
The correct APl// for ll-16ST is 50-029-21581-00.
The correct A/I# for 17-16 is 50-029-22286-00.
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 10-12-93
REFERENCE: ARCO MAGNETIC TAPE(S) WITH LISTINGS
~--II~ 2-16A 9-20-93 CN/ZDL/GR Runz Job#G045
Please sign and return/~the attached copy as receipt
RECEIVED BY__~%4~_~ °fda~c~/vED
OCT
Have A Nice Day!. ~a~;/~//l~-~a~ ~ ) -iS
ATO-1529 Trans# 93111
CENT PINES (C 11
CHEVRON
D&M
# ~O~ OCA~AS (O~I/C,C~)
# ~ON
~~ON
MOB~
# PHILLIPS
PB WELL FH, F~
R&D
# BPX
# STATE OF ALASKA
TEXACO
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 10-12-93
REFERENCE: ARCO o~piN HO~I~ FINALS
2-16A 9-20-93
2-16A 9-20-93
2-16A 9-20-93
2-16A 9-20-93
2-16A 9/9-9/18/93
. 2-16A 9/9-9/18/93
5-15A 8/1-8/12/93
5-15A 8/1-8/12/93
SSTVD Run 1, 1"&2"
CNL/GR R~!n 1, 2"&5"
Z-DEN/CNL/GR/Cal R~_n 1, 2"&5"
BH Profile
MWD/GR
MWD/aR
MWD/aR
MWD/ R
~ 5" MD~/qoo-II'~oZ ANA
~,~5" TVD~q~ ~1 ~07 ANA
~" TVD ~z'~-~tosq ANA
Please sign and return the attached copy as receipt of data.
RECEIVED
Have A Nice Day:
,) /
Sonya Wallace APPROVED _~_~!
ATO-1529 Trans# 9311~ ....
# CENTRAL FILES
# CHEVRON
#D&M
# LILLIAN TKH,ANA
# EXXON
MARATHON
# MOBIL
# PtHLLIPS
# PB WELL FH,F~
R&D
# BPX
# STATE OF ALASKA
# TEXACO
ALASKA OIL AND GAS
CONSERVATION COMMISSION
'WALTER J. HiCKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
August 27, 1993
Terry Jordan
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit DS 2-16A
ARCO Alaska, Inc.
Permit No. 93-116
Sur. Loc. 4948'NSL, 4473'WEL, Sec. 36, TllN, R14E, UM
Btmnhole Loc. 4041'NSL, 4850'WEL, Sec. 26, TllN, R14E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector on the North Slope pager at
659-3607.
Sincerely,
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
_.printed on recycled paper
STATE OF ALASKA
ALASKA~OIL AND GAS CONSERVATION CO. MISSION
PERMIT TO DRILL
2O AAC 25.OO5
la. Type of work Drill [] Redrilll;'lllb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil []
Re-Entry [] Deepenr-II Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE=64 feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28308
4. Location of well at surf-ace 7. Unit or property Name 111. Type Bond(se,, 2o AAC 25.025)
4948' NSL, 4473' WEL, SEC. 36, T11N, R14E Prudhoe Ba)/ Unit
At top of productive interval 8. Well number Number
3421' NSL, 4066' WEL, SEC. 26, T11N, R14E 2-16,A U-630610
At total depth 9. Approximate spud date Amount
4041' NSL, 4850' WEL, SEC. 26, T11N, R14E 8/30/93 $200,000.00
12. Distance to nearest 13. Distance to nearest well ~14. Number of acres in property15. Proposed depth (MD andTVD)
property line
ADL 28309-428' feet No close approach feet 2560 11281' MD/8909' TVD feet
16. To be completed for deviated wells 17.. Anticipated pressure (s~ 20 AAC 25.035 (e)(2))
Kickoff depth 9soo feet Maximum hole angle 9~ o Maximum sudace 3330 psig At total depth (TVD) 8800'/4390 psig
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 29# NT.80S NSCC 1761' 9500' 7491' 11261' 8909' 350 sx C/ass "G"
19. To be completed for Redrill, Re-entry, and Deepen Operations. ~%--. ~ %¢ ~'~' ~
Present well condition summary
Total depth: measured 11250 feet Plugs (measured) ~!~'~.~ ~ '~
true vertical 9009 feet .. .- .......
,!:¢,¢~ Oil..c.~:, ¢-_.~S~, .. b'¢~'_~ ~v':"'"~-
Effective depth: measured 11196 feet Junk (measured) ~ :,~'-'~
true vertical 8899 feet '~'~""-'~ .....
Casing Length Size Cemented Measured depth True Vertical depth
Structural
C o n d u ct o r 98' 20' 300 sx PF 98' 98'
Surface 3029' 13.3/8. 25oo$x For~',~OOsxC 3029' 2676'
Intermediate 11169' 9-5/8" ~5 sx G~O0 sx C 11233' 8994'
Production
Liner
Perforation depth: measured 10990'-11010', 11022'-11034', 11034'-11054', 11060;11097', 11097;11124'
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program []
Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~<~/~'-")-"" ~¢/f4/,~ Title Drillin9 Engineer Supervisor Date
Commission Use Only
Permit Number IAPI number ]Approval ~date ISee cover letter
¢.~ .../,/,'~ j50-o.~.~/- .2. o¢'-¢?-c~/ I ~'"',~"¢"- ~?-, Ifor other requirements
Conditions ~f approval Samples required [] Yes J~ No Mud Icg required r-lYes J~ No ..;: ..- ....
· ,pp, ov~,.~ Copy
Hydrogen sulfide measures [] Yes ,~ No Directional survey required ~ Yes [] No ''~,~ .....
Required workin9 pressure for BOPE [] 2M; E]3M; ~i~.5M; I-'I10M; 1-115M;
Other: Ori.qh~,,' "'-'"',3d By by order of
Approved by David 'vv..,vnnston Commissioner zne commission Date
--orm 10-401 Rev. 12-1-85 Submit in tril~lcic'~te
I Well Name: IDS 2-16
Redrill Plan Summary
[Type of Redrill (producer or injector): ]Producer
Surface Location: 4948' FSL, 4473' FEL, SEC36 T11N R14E
Target Location: 3421' FSL, 4066' FEL, SEC26 T11N R14E
Bottom Hole Location: 4041' FSL, 4850' FEL, SEC26 T11N R14E
I AFE Number: 14J0217 I
[Estimated Start Date: 18/30/93 I
IMD: I 11,281 I ITVD:
I Well Design (conventional, slimhole, etc.):
[Rig: [Nabors 2ES
Operating days to complete: ] 19
1 8909' bkbI I KBE:
I 64.0
] Conventional, Horizontal
Objective:
High GOR and failed cement squeezes are the reasons for this workover. The
target is Sadlerochit Zone 1. A 1000' horizontal profile has been chosen to reduce
gas coning. The rig will drill the well, building angle to 90° at the target, set the
production liner, drill 20' of open hole below the shoe, run robing, and move off
location. The final bottom hole location will be reached using coiled robing at a
later date. The horizontal section to be drilled with coiled tubing is not within the
scope of this request.
Mud Program:
A 9.5 - 10.00 ppg Biozan polymer/KC1 water based mud will be used.
I Special design
considerations I None
Depth 'Density PV YP INT 10MIN FL OIL SOLIDS
(TVD) (PPG) (CP) (#/FT) GEL GEL cc/30min (%) (%)
KOP' 9.5 10 15 5 10 10 0 5
to to to to to to to to to
TD' 10.0 18 30 15 30 5 0 8
Redrill Plan Summary
Anchorage
Page 1
Directional:
[KOP: [9500'MD bkb
I Maximum Hole Angle: 19 °®TD
Close Approach Well: NONE
The above listed wells will be secured during the close approach.
Casing/Tubin[ ram:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tb~ O.D. MD/TVD MD/TVD
8.5" 7" 29# NT-80S NScc 1761 9500/7491 11,261/8909
Tubin~ 4.5" 12.6g L-80 NSct 10,950 0 10,950/8800
Cement Calculations:
I Liner Size: 17"
Basis:1 50~o open hole ex~ess, 40' shoe joint, 150' liner lap and 150' excess above linei' with DP.
Total Cement Volume: 350 sxs of Class G Blend @ 1.18 ft3/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Redrill Plan Summary Page 2
PRU'I 'HOE BAY DR LLZN6
Nar. keF IC;ent.~l:cation
,-'.) TIE-iN 0500 3~50 4!78
8) Er4D OF CURVE ¢~ 9624 3236
C) STA~RT 14./I00 CURVE I0777 35~7 4575
O) END OF ~./~00 CURVE ~26'~ 3755 4878
E) TARGET ~26~ 3755 4876
FI TO 1226] ~375 %80
~1 P!ann~r,g ~a~get ~26~ 3755 4876
DS 02-i6A (P6)
PLAN V I EW
CLOSLIRE ..... : 7i54 feet at Azimuth 307.?1
:DECLINATION.: 30.023 E
SfiALE ...... · ~ inch = 300 feet
BRAWN ..... : 05/28/93
Steal Land
ii i .........
390O
2,750
3600
~450
3300
3000
2850
2700-
5700 5550 540fl 5250 5100 4950 4800 "-~: .... 4200 3909
_ ,~ b;slJ 4500 4,JDfj 4050 3750 3600
i i ~ i Il .... i . ___ -
~-~)~2 ~202~6A ~.4¢ 9.' 52 ~,(~) "-
TOTRL F',
PRUDHOE BAY DRILLING
Mar'$:.eP ]dent]ficati~m~ FJ3 BK.B SECIN INCLN
A) TIE-IN 9500 749t 5E~(il 30 O0
B) ENO OF E~VE ~ 98~4 760t 53]6 ~3. ~8
Ct S1~T 14/]00 6LIF',~'E 1C777 866t . 5770 23 18
E) lA,GEl ~261 B909 B~53 9t.OO
B 40
9~00
BS 02-_16A (P6)
VERTICAL SECTION VIEW
S~.ct~on at SOB. 35
lVO $cal~.' ~ inci~ = 400 fe~t
Dep Scale.' ~ inch = 400 feet
D:"a~n .... '05/29/93
Sect ion Depar'tune
·
(dLfJI) I'~"~'];' ....... t.:GI]'216,~, IJl /-9 9: ~'1,, t~H 5'1.
i .
· ~ -"~- - ............ -.. ' - ~-~ ' :.,~4' ~ ! ,
\
i
.... ' ~ i
' ' J -- .'J"'Z. ~ .... : ' '
~ .~,~
.......... ~ .... .,:., :,, :~. ~ - .......
I
I
-,~.,;.r<-¥~--'1 ........... % ', ! I ~:. j ~ I I
.......... ~ .............. ~ -~ - * ~ I- ' ~ ............. ' .... ' ......... ~ ~ .............. i .....
~;~ 7:C~q C -~ -" ...... F ..... ' ..... 1 ...... ~ ::'~=" .............. ' ............ r ...... 7 ..... h ..........
i
i
1. Type of Request:
2. Name of Operator ·
ARCO Alaska, Inc.
,~... STATE OF ALASKA
,o. '.
Abandon X Sus~nd O~ration Shuldown Re-enter sus~nded we~
Change approved pr~ram ~ ~Pull tubing ~ Vadance ~ Perforate ~ X Plugback Ior r~ I
5. Type ol Well: 6. Datum elev~
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at sudace
4948' NSL, 4473' WEL, SEC. 36, T11N, R14E
At top of productive interval
2014'SNL, 1616'EWL, SEC. 26, T11N, R14E
At effective depth
1659'SN~ 1443'EWL, SEC. 26, T11N, R14E
At total depth
1683' SNL, 14,53' EWL, sEc. 26, T11N, R14E
12. Present well condition summary
Total depth: measured
true vertical
Development X
Exploratory __
Slrafigraphic __
Service
[ E6EIVED
A U G 7 7 199,]
Alaska OiJ & Gas Cons. 6ommissio,
Auchora[/e
KBE = 64' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
2-16
9. Permit number
80-20
10. APl number
50- 029-20448
11. Field/Pool
Prudhoe Bay Field/Oil Pool
11250 feet
9099 feet
Plugs (measured)
Effective depth: measured
true vertical
11196 feet
8962 feet
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
98' 20' 431 sx PF 98' 98'
2965' 13-3/8" 2500 sx Fondu & 3029' 2676'
400 sx PFC
11169' 9-5/8" 1965 sx Fondu & 11233' 8994'
300 sx PFC
measured 10990'-11010', 11022'-11034', 11034'-11054', 11060'-11097', 11097'-11124'
true vertical 8844;8882', 8882;8896', 8896;8899', 8899'-8901'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT@ 41'MD; 4-1/2", 12.6~, L-80, PCT@ 10856'MD
Packers and SSSV (type and measured depth) BOT 2B packer wi-l" extension @ 10765' MD; 4-1/2", Otis HRQ SSSV @ 2237' MD
13. Attachments DescriPtion summary of proposal x Detailed operations program __ BOP sketch
14. Estimated date for commencing operation
8/2O/93
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended
Service
17. I here~y~cer~.,y~.,,, that the foregoing is true and correct to the best of my knowledge.
--..- / ,.,..- -
, ~ ,,c...~> .. r~ ,
Signed '"'---' '--" /'/'~~.,4z~ Title Drilling Engineer Supervisor
FOR COMMISSION USE ONLY
Date ~-//4:7 ,
Conditions of approval: Notify Commission so representative may witness
Plug integrity_ BOP Test__ Location clearance__
Mechanical Integrity Test__ Subsequent form required 10-
! Approval No.¢ ,=~ ..__,~/,~7/
Approved by order of the Commission
Commissioner Date
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
** CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
Loc /q¢/~__ '~/2~/;/x~
[~ thru 8]
[10 S 13]
[14 thru 22]
[23 thru 28]t
(5) BOPE
Company
YES
1. Is permit fee attached ............................................... /~
2. Is well to be located in a defined pool .............................. ~_
3. Is well located proper distance from property line ...................
4. Is well located proper distance from other wells .....................
5. Is sufficient undo. dicated acreage available in this pool ............. L
6. Is well to be deviated & is wellbore plat included ...................
7. Is operator the only affected party ..................................
8. Can permit be approved before 15-day wait ............................
~
10.
11.
12.
13.
14.
15.
Does operator have a bond in force ...................................
Is a conservation order needed .......................................
Is administrative approval needed ....................................
Is lease nLrnber appropriate ..........................................
Does well have a unique name & nLrnber ................................
Is conductor string provided ......................................... /¢'~.
Wil 1 surface casing protect all zones reasonably expected
to serve as an underground source of drinking water ..................
Is enough cement used to circulate on conductor & surface ............
Will cement tie in surface & intermediate or production strings ......
Will cement cover all known productive horizons ..................... q/~
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wellbore separation proposed .............................
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to ~-¢mrz> psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
Lease & Well ~ ~/_~ ~r~z,~c::)~.~ /~./5¢~_.¢
NO REMARKS
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
j,
(6) Other ~ ~//////~?
[29 thru 31]
(7) Contact ~'~ ?./~./¢/~73
' [32]
(8) Addl
29.
30.
31.
32.
33.
geology' engineering:
DW
RPJ~C/~_.. MTM ~'--'
B EWi~c~J DH
rev 6/93
jo/6.011
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Name and phone number of contact to supply weekly progress data ......
Additional
requirements .............................................
Additional
INITIAL GEOLUNITON/OFF
POOLCLASS STATUS AREA SHORE
remarks'
NERIDIAN' SN
WELL TYPE'
Inj
Redrill,)~ Rev
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ADASKA CO~iPUTING CENTER *
* ....... $CHLUNBERGER -------*
******************************
FIELD NAME : PRUDHOE BAY
STATE : ALASKA
API NUMBER : 50-029-20448-0!
REFERENCE NO : 95147
RECEIVED
APR 2 1 1995
Alaska Oil & Gas Cons. Commission
Anchorage
LIS Tao~. Verification List!no
Schl~)mberqer Alaska Comgu. tino Center
6-~PR-!995 !6:42
OPlC.L!,~ : WLTC
R~Ef, ~A~i~ : 05~47
C0i]T[NIJA'I'~f)N # :
CO~EN'.I; : ~CO ~I,~SKA .~f~C, Pai~i>~OE DAY DS 2-16A 50-029-20448-01
DATF : OS/u4/ b
O~[C1N : WLIC
TAP~' NA~: ~ 05~.!7
co~¢'r : a~c~i ~I,ASKa INC. PRHDHOE BAY DS ~-16A 50-029-20448-0!
pRUnHOE ~,AY
OPE~ ATC)R:
LOGO.lNG C~r4PANY:
T~PF Cg~ATIaAJ [)ATE:
JOb DArn
SECT[Of{:
Tot,;~5 N I P:
F ~-~ D:
FSL:
F' ~ ~.,:
EI.,EVATIDN(FT F'RO~ ~',iSL O)
KELLY
CASING R~CORD
1 ST
~ r,-: !') ST{~ J[~''~
DS 02-16A
500292044801
ARC~ ALASKA INC,
SCHLUMBERGER WELL SERVICES
6-APR-95
[;TT RIIN 1
d a, ~,i E 5 '!jUNNEL
YVON .H tJELVAN
RUN 2
95147
36
lin
!4E
4948
4473
61,b0
6o.20
31.40
(jPEN HOLE CA$IaG DRILLERS
~-:.TT SIZE (IN) SIZe. (IN..) DEPTH (FT)
8 · 500 00 ! 1307,0
PAGE:
[.-,IS Tare Verification :..ist. inq
SchlV.~r:kerqer AlasKa Comoo. tino Center
6-APR-1995 16:42
.PRO!)I~C~rIO~., .6TRTI-'~
~HIS ,IUB A ~iED. GW... OF RU.N i AND ~UN ~. PREVIOUSLY TWO
TAPES WERE GIVE~, ONE FOR RUt~,,I (JOB REFERENCE
93560 F~(')~ 9400 TO ~.307') A,~D ONE'"FOR RUN 2 (JOB
REF~RFNCE ~ 9~56! FRi]M 11357' TO
~i D~:PTH SHTFTS APPLIED.
PAGE~
**** F.'[ 1) F.
F)LI~ NA-~k : FDIT .001
SFiRVICE : FLOC
~!AX R~iC SIZe? : 10~4
LAST
Depth Shifted nn4 clipped curves; all bit runs merged.
o.5000
STAR'[' D~JPTH
....
STOP DEPTH
.....9400
~IT RUN NO. ~ERGF TOP
1 9400.0
2 11307,0
~ERGE BASE
11933.0
(.;RRW.gal'~ TS THE GA~IMA' R~ AS RECORDED,
(;~_[~.~':>71~ ~S -rwC GAN~,~A RAY INTERPOLATED.
. .,. . E~RA ION.
Kelp r,,WD IS T~-iw RATE
CURVE: $NI~T DA'f.A f_r4EASURED DEPTH)
.......... EQUIVALENT UNSHIFTED DEPTH--- ...... -
LIS Tame Verification I, istI. nm
$chlumberqer AlasK~ COm.~tir:o Center
6-APR-1995 16:42
#
LIS Ff)R.V-AT DATA
t 0
2 66 0
~ 7] 16
~ 66
5 66
5 73
7 65
~ 68 0,5
9 65
1! 66 64
1.~ 66 0
14 65 FT
1.5 65 68
16 66 1
0 66 0
N~ SF~V UNIT
If) ORDER ~ L
I)FPT
.. -
ROP u~r) FDH[~ 0
;i''';; .................. ~ ..... ~ ..... ~ ..... '''"'''''''''''
.mAmm APl APl FI['E N. B NUB SI E 'REPR PROCESS
OG TYPE CbASS MOD NUmB SANP ~LE~ CODE (HEX)
...... ; ..... . ......... --; ..... ~-- .... . ..... . ..... -.....;...
0 O0 O0 0 ! ~ 68 0000000 O0
0 000 O0 0 1 ! ! 4 68 0000000000
0 000 O0 0 1 ! ! 4 68 0000000000
0 000 O0 0 ! 1 I 4- 6fl 0000000000
mmlmmmmmmmmlmmlmmmIMmmmmNmImmmNmm~mmmmmmmmmmmmmmIImmlImlmmN
DEPT. 11933°000
DEPT, l~O00.OOt)
DFPT.
GRDW.MND I999.250 GRIN,~WD -999.250 ROP.MWD
GRPw.dWD 37.000 GRIN.MWD 37,000 ROP.~WD
GRDW.MWD 23.800 GRIN,~WD 23,800 ROP.MWD
GRPW.MWD 38.~00 GRIN,MWD 38.800 ROP.~WD
35,500
'29,200
19,300
57',500
LIS Tape verification l'_,istir~o
Schlumberger A!a~Ka ComF_~ut!n.O Center
DF~PT. o500. UO". :., GRRV~. P{WO,.
DFPT. 9400 . 000 ~R_'Rb;. h~WL)
END dF DATA
6-APR-lEg5 16:42
~32.100 GRIN.MWD
180.!00 GRIN.MWD
-999.~50 GRIN.~IWD
132.!00
180.100
16,300
ROP.MWD
PAGE:
36,900
36,600
51',300
F]'I'_,...v .tJA~.~g ; ~DTI' ,00l
SFRVlCP~ : F'I. I C
V~RSi[IN : q('3 !. C01
DATF
h~AX R~:(: STZ~ : !024
F T LF'. T ',f' n !;: :
L. ~ G'r PILE
**** FTI:E H EA I).m,R
FILF' NAU, E : EDIT .002
6~RV!CIC : ~blC
VPTRSIO{'~ : O01CO1
DAT~ : 95/U4/ f~
~,~X REC STZ~ : !024
bAs'r VII, E
FIL~ HEADER
FII,~ NU~BRR 2
NWl)
Curves and log header data for each bit run in separate files,
DFP'rH INC~EHgf~T ~ 0.5000
FTL~:
[~iADF:R DATA
DA'rE 5f3G~gg
~fiFTW-q~E t
SI~RFACE
DATA TYPE
TD I)~IK, L,~R CF'T):
T~t~P ~,[)O T(~TERVAL LFT)
STOP DEPTH
94:00.0
18-$EP-93
REAL-TIME
11307,0
9400,0
11307.0
Schlum.~erqer AlasKa Compt!t~_no Center
6-APR-1995 16:-42
~3PEN HiILE ~TT ~;'['ZF
OR I ~,[.,FRS C ASi ¢,~G
~4UD 'rYPE:
qUD VTSCO~.[TY
FLUT~ ~OSS CC~)
RFSTSTiVITY (O~-~) .A'~ T~,~DERATURE
~(]~ CAKE AT
TOOb NUMBER
8,500
KCL-POLYM£R
0,000
0.000
0,000
t',.ATRIY D~iN~;TTY:
TOOl., STA~:Df.,'~'F fiN):
FwR FR.F,O~ENCY (HZ}:
P~.;MAPKS: GA;".,~A RAY CIIRVES CORRECTED
T(~ w I REI,I ~-~E
SL[~ I GA~4A R~V TO 11263'
TE LOGGED I$ ~'ROM 09 SEP 93 ~ .18-$EP-93,
IIRUE$ WITH '_]:~E EXTENSION' ~W.D A~E AS RECORDED.
CURVES w
. ._ I .?, TH~; EXTE!'~$iON r,;WH ARE INTERPOLATED,-
$
0.0
0.0
0.0
PAGE:
[,IS Tape Vertffcation r, istin, g
.qchlt.lmh~r.qer. AlaSKa Compllt. fno Center.
6-APR-1995 16:42
PAGE:
** nA'r~ FnR. U. AT SpF, CT_~'TCATI~iN
T
U }'_'. C 0 ~ D **
m
! 66 0
2 66 0
4 66
5 66
6 73
7 65
8 68 0.5
9 65 FT
11. 66 51
12 6~
~ 66 0
14 65 FT
[5 6~ 68
!6 66
0 66 I
mmJmmmmmm!m mmmmmm m mmMm. . m ~ m
DFPT FT
g~ ~un AAP
G~ ~I AAP
.
ORDFR ~ 60G TYPE CLASS ~OD NUmB SAMP ~LEM CODE (HEX)
.~.m~lml.mj.mm~m.mm~mlm.mm.--mmm~m.mlmmmmm..mmmml.mmIlmliI.l~m~mm~llmlmm
O0 000 O0 0 ! I 4 68 0 00000000
] O0 000 O0 ~ ~ !. ~ 4 68 0000000000
! O0 000 O0 0 2 ! ! 4 6B 0000000000
~ O0 000 O0 0 2 1 ! 4 B8 0000000000
~ O0 000 O0 0 ~ i ! 4 68 0000000000
mmmmmmmmmmmmmm.mmmmmm.mmmmmmmmmmmmmm~m--mmmmmmmmmmmm~mmmmmmmmmmmmmmmmmm~
D~PT. 113
DFPq'. 110
DFPT.
ROP~.MWN
DFP?. I00
i)FPT, g5
07.000 GR,NWD -999,250 GR,MWH -999.250 ROPE'.MWD
{)0,000 ~R,~WD 23.800 GR.MWH 23,800 ROPE.~WD
n0.000 ~R.~w~) 38.800 GR,MWH -38.800 ROPE,MWD
O0.OOO GR.~,~.~I) 132.1o0 GR.MW~ 132.100 ROPE.MWD
00.O00 GR.;dwi) 180.!00 GR,MWH 180,100 ROPE.~WD
31,200
19.300
57.500
36,900
36,600
LIS Tame Verification Li. st~n.q
$cblumberg.m.r AlasKa Computfmq Center
6-APR-1995 i6:42
PAGE~
DMPT. 0400.000
ROP~.~W~! 51.3n0
-999,250 GR,MWH
16.300 ROPE.MWD
51.300
** Er.]{.) (1F r)ATA ,.t-
**** FTLF. T.R h T. T,E~
FILET ~-!A~,'. : MDIT ,002
SERVICE : FL, lC
VF. RAIfiN : OO1CO!
D~'i'~ ," 95104./ 6
?..AX REC &TZ~. : !024
F l L~.' 7.' Y P ~..: :
FILF' NA~I~: : EDIT ,003
SERVICE : ~LTC
VERSION : 001. C01
D~TF : 05/04/ 6
~,~AX RFC SIZE : 102~
FTLF TYPE : bi~
RAw g'vO
Curves aha log header data for each bit run in separate files,
BIT RUN i,iil;,'iRgR: .9.
DEPTI-I I NC ~ E."'-~EN T: 0,5000
F T L~" S g~.~t,{ A R V
VF]I'<D.r)R 'fOOl, cor)E START DEPTH
$
BOG HEADED .m. ATA
DA:rE
Sr/IFTWA~E
$~IRFACE $OFT;~aR_E VMRSION:
OOWr,lHfiLE SOFTI'!A~E VERSION:
DATA TYPF
TI.) DRILLER
TOP LOG INTEPVAL (FT) ..'
P () T'I.'(I F~
~()LE I.MCI.,it,!ATI[]N (DEG)
STOP DEPTH
!1357.0
28-UCT-93
~EAB-TIME
!1933.0
11357.0
11933.0
LIS Tape verification
Schlumberger Al. asKa ~omp,lting Center
16:42
i--( T N T M [!F,.
TOOL STRT~iG (TOP TF)
VEPJDOD TOOL CODE TOOL
~LI~EII(ILE AND CA67NG DATA
DOREH[)[,E Cf)~.JD l TI(I:~S ~UD '!:YPF:
,~UD OENSITY ([,8/G):
,4UO VTSCt)SITY (S):
q~lD PFI;
~4~I!3 CHI.,ORTD~:6 fPP,) ~
RESTSTIVIq'Y (()H~) A.T T~,~PERATURE (DEGF)
~t. lP AT ~iEASUPED TE~PE~.ATURE (~T):
A~UD F.[I, TRATt~ AT (MT)
MUn CAKE AT
TOOL NUMBER
3.750
XANVISWATER
0,000
0,000
0.000
H~LE CLJRRECTIn,~
TunL STA~DnFF (IN):
DE~ARKS: DATE L(_IGGE!') IS F'RO~ 22-0CT-93 TO 28-0CT-93,
CURVES WiTH THE EXTENSION NWL ARE AS R~COROED,
Ct!RV~$ WITH T~E EXTENSION ~WH ARE IMTERPOL~TED,-
$
LTS F~R~AT DATA
0.0
0.0
0.0
PAGE:
DATA FORhIAT' SPECIFICATION RECORD **
** SET TYPE - 64J;;B **
.............., ; ..........
~ 66 0
3 73
4 66
5 66
bis ~a.~e Veri~tc~t._ton [,ist!.no
SchlUmberger AlesK~ Computlnq Center
6-A~R-1995 16:42
PAGE:
D~PT FT
GU HwIi AAP
7 65
8 68 0,5
9 m5 FT
!1 66 42
!3 66 0
14 65 MT
1~ 60 68
16 66
T TYP~ - CHAN **
· ~; V~CE APl API API API .E B NUMB SIZE REPR OC~SS
ORDE~ ~ I,OG TYPE CLASS MOD NUMB SA~P EbEM CODE (HEX)
O0 000 O0 0 ~ ! ! 4 68 00.000 O0000
) 0(, 000 O~ 0 3 ! I 4 68 0000000000
? 00 000 00 0 3 1 I 4 68 0000000000
~ O0 000 O0 0 3 1 1 4 68 0000000000
P OO 0o0 O0 o ~ I 1 4 68 0000000000
O0 000 O0 0 3 I ! 4 68 0000000000
* * I') A T A ~ *
DEPT.
ROPF,MWI-!
DEPT.
ROPF',~WH
DMPT.
!1933.O0(~ GR.~WD -999.250 GR.MWM -999.~50 ROPE.MWD
!1500.0o() Ga.M'WD 37.000 GR.~WH 37.000 ROPEoMWD
~9.200 VOEP.MWD 8~93.600
11357.u00 GR.MWD -999.250 GR.~WH 12.000 ROPE.MWD
21.300 VI)EP.MWD -999.~0
** E~!D OF DATA
35,500
-29.200
**** FIbW. TRAII.,MR ****
FTLF NA.~E : EDIT ,(i03
SERVICE : FbIC
DA'I'~' ~ 95/04/ 6
MaX RP3C STZR : 1.0~4
FIIJF TyP~i :
LAMT FI[,E
t, lf. Tar:e Vert£~_cat.!.on !,istlnO
Sch]umber¢'jer Al.a,~ka Computt!~q renter
6-~PR-199§
PAGEI
tO
O~T~ : o51o4/ 5
T~P~ ~'~A~-~E ~ 95147
Cn~3~,~E~.;T : ARCO AhASKA THC, PRUDHOE BAY DS 2-164 50-029-20448-01
D~TE : 9~I04/ 6
REEf-, NA~E : g5147
CONT!N{J~TTOM ~
COqr~EIJT : aRCO AUA,~KA INC, PRUDHOE BAY D~ ~-ifA 50-029-20448-01
ARCO
PRUDHF~ ..
3,., SAY
MORTN
ALASKA
93560
RECEIVED
FEB ! 7 1994
Alaska Oil & Gas Cons. Commission
Anchorage
o.,. ,/.'zA/.,
I
5chl~Fer~U~r &]_aSk. a Como~t:tn.n. ~enter
3'-d~--',-1994 !513'.8
l~-:v PR[IbHUK [~AY,
02'16A,50-O2g-20448-O1
I~'~C.,PRIII)HUFT BAY, D,$.
D,$. (;2-~6A
50029204480].
ARCO ALASKA,
03-,3A~-94
~','.E~.t., 0 )
4473
31.4-0
I '~'JC
02-16A,50-029-~0¢48-01
BIT _RI. IN
PAGE:
L,l,q Ta.~e V¢,rftlcot~o~; l,i.~t.ir;n
SchlU. r:'~herc.'er .61asK'a ::Oh:L~Ut.~r~n Cent:eT
;-JAN-lq94
RF~!~R":~.: 'j.',~:!c [~i'~A %~5 PR[)VIOEP RY A~-:RD~LL/SCHbUMBERGER
FF(~ ~, "~'~[~/"~g~'~iA P~Y PUN CONOUCTED og'or,.-93
· rn t~.;-SEF-93 [,'i.]~ g't{F 02-16A
~f;(.,:~- F,~]P'[it~ i~ATg n~' PENeTRATiON OVER
PAGE~
[,,' r 1_, F r.] ['~ r.; i:< ! t:, :) 1' '.f ,, O O i
SFR V.[ CF, : ."" L, T C
V- FR,q £ D ~., !
DaT? : q41(]! / 3
tqAX R[,:C 5TZ? :
bB.,.ST l';J.l 1~, :
FTi,~ ;-,iL;:4[~[.TH.-"
M ':.,'-' L)
! .
.¢.
CI!RV;,; St,lI~'."i" ;).~:F.~ .e;-~F'^SI. JRk:I) PPiOTH)
.......... FOU!VA[:Et~T US~$HIIVTKD L)EPTH- .........
OATA !.S
{}F PENETRATION OVER 5 FT AVERA(;~.
F?/HR )
CORPECTED FOR H~b~ SIZE, ~IjD WEIGHT AND
SlZ~ (AAPI)
THiS DATA b~.5 NOT DONF %~!TH THXS
Scb],un~herqer Alaska ,"om~.~uttn-q Center
3- J A-~,]- .'!. 9 9 4
PAGEt
0.5
FT
~5
.........NAi'.4F 5~'~/''~'7;'~7~''~;'"''~.'''~i''~-[~ ~. - 1 A A ........... ~I FI[,E NU~;''~. ~B ................... SIZE REPR eRO'~'''
TD ;~Mf>p:~ ~ br~G TYPe CheSS ~'3D r,~U~B SA~P ELEM CODE (HEX)
mmmmm~mmmmm~mmmmm~Om~ ~ mmm ~m~ om mmmmmmmmmmmmm~ m~mmm mmmmmm~m~mmmmmmm~mmmm m m
DFPT Fq 0 . 0 0 I .. 4 .0000 _ 0
l,:l:S TaO,? Ver. f.f.~cat, io,~
~-JaN-~994 15:38
CD~;..P&NY MA-u.E' : ARCO ALASKA, INC,
aD.?POUGH '.. MORTH ~SI,OPE
$:.r a TE : ALASKA-
RECEIVED
FEB i 7 19~4
Alaslia Oil & Gas Cons. Commission
Anchorage
LIS Tape V~rii.'ICation
SchlU_mher,';.cr x~lasKa K'o~?r. utino Center
PAGE:
D.S.
o2-16A,50-029-20448-01
8FRV
TIP?
CON?
PREV
T.~F.,F
N W I.)
WFI,!,
ICf:. i',;5,:,!c' ; Ei)T'I
-' q~_/0~/ 3
.If,' : ~L'f C
[~- A '.~ E : -'-~ ..4 '". 0 1
/.[' {.,A'[TIjN # : 1.
I F' L, ,"_',_ T A .r-' E :
EI~.'",' : .a. 5'Cil ]I!,i'~SF~A,
fir"l-..
Ij I~I .i.
Or~EP A'!'i'.- ~:
LO. GC-IN(? Cr]Finh!'~::
JO(~ D t, '.,' A
· T(JP. i'J I..i:.!bf<R:
l,('jCt.;, l ,~G E,',~ G :i. i': [.;F.[,: z
,q F,C T 1'/)q;
n A .~' (:;F::
F'f.~_~VAJ'TLj:.~(Fi' t' !:'"[~,;''~
I)E~I~ICK Ff,,jn[<:
dnOfI,'.'-r)
#
~,~ Fl,T, C ./; ,q _T. "'-.' f;
1 s'r s 1' R j. ,'..f(:-:
2bt:. ,q T P. 'l. "-.f G
.ff';C,,PRUDFIUE P~AY, D.S. 02-!6A,50-029-2044~-01
500292044801
AECO ALASKA,
2O-DEC-93
8IT pi.iN 2
3(,-~
11,,'4
4948
4473
t, 1.60
61.6,:)
C~STNC D~!I,LERS
8TZR (I~,) DEPTH
LIS ma~e ~'ett~ent.~on l~j. stjr~o
$chSu.mher,~er alaska ('oh~puttnq cent. er
Hr~bF: r}vj.o'l'~t, 'I'PU..,.-': ".:}'jRTTC/~,[_, DF:f'Tf-~ RATE uF PENDTAA'I':I. DN
f~V!::P 5 VOOi; AVP£RA.r';i'< A.~ID 'I:H~; AAP? GRS '--'-.'gR.~ PROVIDED.
PACEI
1 ,
$
B/~'r'F'LTr;F._'. C',iDt/;,~ F'IIp
C[?RV_~: ,":;qi.F"P I.)AT~. (5'.t"A-qUP~L' DI:~p;Ih)
ST .r.,F t)E:PTi!
TN~,' ............ F:r~UI,('I~"iNG r"~T?-- TS ['R"/t..-,~ J.'DED.. . :.'
j. i_) ;'~>~U T~ijF: '1" '"'_ ......
Rr~.~.;,:v~ = PATE OF PEMETRATION OVE~ 5 FT AVRRAG~.
F:DI~I.?,:,; r;c~b, iF' P:q q'~':i,q DATA
PAGE:
$
#
hT8 F-n?'~Aq' D^q:A
DATA
t~O0 O0 0 I ! 4 6 .. 000000
o (:~6 O0 o i 1 ! 4 68 0000000000
0 (~t)O OC O 1 1 I 4 68 O00OO00000
n r.)O0 OO O i 1 I 4 6~ 0o00000000
'I'VL,. f,. t, i.~ 8877.201 P-. UP 5. !<,'.~ D 35.500 GRS. ~.wP
:PV~; ,qi-~i;., -c~90 250 ROPS.t-:'--:,'D 21,300 GRS.~',WD
-999.250
-999°250
bi.':;, q'ar'e \crlfj. c. ar. ion bjst. ina
Scblu,tber,.,er ,\lasKa co,.-.~.:,utin~
994 18- :.-$6
PAGE:
8F ~'{~ j. C ~:~
V r-._'.. P.. S In,_
h'%X
FIEF'
* ~':g * 't' a, P F !'R A 1 f. f-.;:.;
SF~(VJ C~.: k.,a:v..F:
[')/~ "1' F
TaPF ":A'-"L .' 035t,~
C .~ ?~ 'y 1 .,-. ! ~ .a, ';. l ('l'H ff..
C.o,'.!!~?_:~'j : i,~,.."..i AbASKA, i?.!C, ,P-RI, IDH[3_F.~' FAY, D,So 02,',16A,50-029-20448-0i
ALASKA INC
D.S. 2 - 16A
PRUDHOE BAY
REC-EIVED
OCT 1 9 199~
Alaska 0.il & Gas Cons. Commi;sion
Run 1:
20 - September - 199:3
CN/ZDL/GR
Conveyed
10003
11281
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
RUN1
6045.00
J. DAHL
SEE REMARKS
D.S. 2 - 16A
500292044801
ARCO ALASKA INCORPORATED
ATLAS WIRELINE SERVICES
24-SEP-93
RUN2 RUN3
36
11N
14E
4948
4473
· 61.64
60.24
31.35
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 9450.0
8.500 11307.0
CN/ZDL/GR
LOGS WITNESSED BY: D. SCOTT & J. GAFFNEY.
CIRCULATION STOPPED: 09:45 19-SEP-93.
PIPE CONVEYED LOGGING OPERATION. CURVES SPIKE AT PIPE
JOINT MAKEUP CONNECTIONS. CONNECTION DATA SPIKE AT
11199 FOR ZDL CURVES, 11179 FOR CN CURVES, & 11173
FOR GR CURVE.
DENSITY SCALE, 1.65 - 2.65, REPRESENTS SANDSTONE
POROSITY MATRIX.
BARITE PRESENT IN MUD SYSTEM (9%) WILL EFFECT PE
RESPONSE.
NEUTRON LOGGING PARAMETERS: CALIPER CORRECTED
SANDSTONE MATRIX
CHISM FILTERING NOT ACTIVE.
MAIN PASS SPLICED BETWEEN TWO PASSES (@10550). REPEAT
PASS PRESENTED IS THE OVERLAP BETWEEN THOSE PASSES.
SPLICE WAS PERFORMED IN THE FIELD. THE SPLICED MAIN
PASS IS PRESENTED HERE.
$
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves; all runs merge4; no case
hole data.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
2435
SDN
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA
0.5000
START DEPTH STOP DEPTH
10003.0 11259.0
10003.0 11256.0
10003.0 11281.0
GR
(MEASURED DEPTH)
BASELINE DEPTH
9995.0
10034.0
10059.0
10067.0
10080.5
10081.5
10083.0
10083.5
10091.0
10113.0
10120.5
10132.0
10134.0
10150.0
10152.5
10157.0
10163.0
10175.0
10178.0
10188.5
10192.0
10194.0
10194.5
10202.5
10208.5
10216.5
10221.0
10229.5
10240.5
10245.0
10257.5
10275.0
10282.5
10286.0
10295.0
10304.0
10310.0
10318.0
10333.5
10347.5
10351.5
RHOB
9995.0
10032.5
10065
10080
10081
.5
.0
.5
10084.0
10091.5
10113.0
10120.0
10132.5
10134.5
10151.0
10153.0
10157.0
10162.0
10177
10187
10192
10195
10202
10208
10216
10220
.5
.5
.0
.0
.0
.0
.0
.0
10240.0
10244.5
10257.0
10274.5
10282.5
EQUIVALENT UNSHIFTED DEPTH .........
NPHI
9995.0
10034.5
10058.0
10067.0
10080.0
10081.0
10083.0
10091.5
10113.5
10120.5
10134.5
10150.0
10153.0
10157.0
10162.0
10176.0
10178.5
10188.5
10192.0
10195.5
10202.0
10208.5
10216.5
10221.0
10230.0
10240.0
10244.5
10257.0
10274.5
10282.5
10286.0
10295.5
10304.0
10310.5
10318.0
10333.5
10348.0
10351.5
10359.5
10363,5
10366.5
10403.0
10406.0
10420.0
10437.0
10472.0
10475.5
10479.0
10483.0
10490.5
10491.0
10493.5
10503.0
10517.5
10525.0
10531.0
10541.5
10568.5
10580.5
10584.0
10586.5
10588.0
10588.5
10608.5
10644.5
10699.0
10749.0
10763.5
10816.0
10818.0
10820.5
10863.0
10880.0
10885.5
10944.5
10945.0
10965.5
10966.0
10973.5
11057.0
11058.5
11062.5
11071.0
11089.5
11106.0
11111.0
11123.0
11215.0
11252.5
11299.0
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
GR
2435
2435
10359.5
10364.5
10366.5
10406.5
10437.0
10484.0
10490.5
10494.0
10503.0
10517.0
10524.5
10541.5
10581.0
10583.5
10586.0
10588.0
10608.5
10698.5
10748.5
10763.5
10815.5
10817.5
10820.5
10862.5
10879.5
10884.5
10943.0
10965.5
10972.5
11057.5
11062.5
11070.0
11088.5
11106.5
11111.0
11122.5
11215.0
11252.5
11299.0
RUN NO.
1
1
1
1
10359.0
10364.0
10366.5
10402.5
10407.0
10420.0
10437.5
10472.0
10475.5
10478.0
10491.0
10503.0
10517.5
10524.5
10531.0
10541.5
10568.5
10581.0
10583.5
10587.0
10589.0
10608.5
10643.5
10698.5
10749.0
10763.5
10815.5
10817.5
10820.5
10863.0
10879.5
10885.5
10944.0
10965.5
10973.5
11058.0
11070.0
11088.5
11106.5
11111.0
11122.5
11215.0
11252.5
11299.0
PASS NO.
4
5
4
5
MERGE TOP
10003.0
10550.0
10003.0
10550.0
MERGE BASE
10550.0
11259.0
10550.0
11256.0
SDN
SDN
$
REMARKS:
CN
WN
FN
COUN
STAT
i 4 10003.0 10550.0
i 5 10550.0 11281.0
MAIN PASS.
DRHO, PEF, CALl, MTEM, TENS, & TEND WERE SHIFTED WITH
RHOB.
FUCT & NUCT WERE SHIFTED WITH NPHI.
$
: ARCO ALASKA INCORPORATED
: D.S. 2 - 16A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves-.
Name Tool Code Samples Units
i GR 2435 68 1 GAPI
2 NPHI 2435 68 1 PU-S
3 FUCT 2435 68 I CPS
4 NUCT 2435 68 1 CPS
5 MTEM 2435 68 1 DEGF
6 TEND 2435 68 1 LB
7 TENS 2435 68 1 LB
8 RHOB SDN 68 i G/C3
9 DRHO SDN 68 1 G/C3
10 PEF SDN 68 1 BN/E
11 CALl SDN 68 1 IN
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 08 501 10 0
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
4 4 22 779 91 0
4 4 22 779 91 0
4 4 22 779 91 0
4 4 22 779 91 0
44
* DATA RECORD (TYPE# 0)
Total Data Records: 125
1014 BYTES *
Tape File Start Depth = 11299.000000
Tape File End Depth = 9995.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
31309 datums
Tape Subfile: 2 314 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 2
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
1
5
0.2500
VENDOR TOOL CODE START DEPTH
GR 10002.5
2435 10002.5
ZDL 10002.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWVL
CHT
MODL
KNJT
GR
CN
KNJT
PCM
ZDL
KNJT
TEMP
PCM
$
SWIVEL SUB
CABLEHEAD TENSION
MODAL SUB
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
Z-DENSITY
KNUCKLE JOINT
TEMPERATURE
PULSE CODE MODULATOR
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
STOP DEPTH
11260.0
11257.0
11282.0
20-SEP-93
FSYS REV. J001 VER. 1.1
945 19-SEP-93
657 20-SEP-93
11307.0
11296.0
10000.0
11285.0
1200.0
TOOL NUMBER
3944XA
3974XA
3517XA
3921NA
1309XA
2435XA
3921NA
3508EA
2222MA/2222EA
3921NA
2806XA
3506XA
8.500
9450.0
0.0
XANVIS KCL
10.00
98.0
9.5
4.4
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
175.0
O. 139
0.057
0.106
0.000
O. 217
0.000
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
0.000
TOOL STANDOFF (IN):
0.0
REMARKS:
MAIN PASS.
NEUTRON IS CALIPER CORRECTED.
IS NOT ACTIVE.
$
CHISM FILTERING
CN
WN
FN
COUN
STAT
: ARCO ALASKA INCORPORATED
: D.S. 2 - 16A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
68.0
175.0
68.0
0.0
68.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
GR 2435 68 1 GAPI
CNC 2435 68 1 PU-S
CNCF 2435 68 1 PU-S
CN 2435 68 1 PU-L
LSN 2435 68 1 CPS
SSN 2435 68 1 CPS
TEMP 2435 68 1 DEGF
CHT 2435 68 1 LB
TTEN 2435 68 1 LB
SPD 2435 68 1 F/MN
ZDEN ZDL 68 1 G/C3
PORZ ZDL 68 1 PU-S
ZCOR ZDL 68 1 G/C3
PE ZDL 68 1 BN/E
HRD1 ZDL 68 1 CPS
HRD2 ZDL 68 1 CPS
SFT2 ZDL 68 1 CPS
SHR ZDL 68
CAL ZDL 68 1 IN
4 4 08 501 10 0
4 4 98 211 23 1
4 4 98 211 23 1
4 4 52 326 75 5
4 4 84 023 70 1
4 4 83 368 34 1
4 4 18 487 70 6
4 4 19 912 29 5
4 4 19 912 29 5
4 4 54 376 29 5
4 4 52 443 33 1
4 4 46 370 25
4 4 09 884 61 1
4 4 76 731 33
4 4 15 242 69 1
4 4 14 587 33
4 4 78 812 61 1
4 4 37 715 66 1
4 4 24 115 90 6
* DATA RECORD (TYPE# 0)
Total Data Records: 435
966 BYTES *
76
Tape File Start Depth = 11299.000000
Tape File End Depth = 9995.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
104341 datums
Tape Subfile: 3
518 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 4 is type: LIS
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
1
1
4
0.2500
VENDOR TOOL CODE START DEPTH
GR 10550.0
2435 10550.0
ZDL 1O550.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWVL
CHT
MODL
KNJT
GR
CN
KNJT
PCM
ZDL
KNJT
TEMP
PCM
$
SWIVEL SUB
CABLEHEAD TENSION
MODAL SUB
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
Z-DENSITY
KNUCKLE JOINT
TEMPERATURE
PULSE CODE MODULATOR
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
STOP DEPTH
10696.0
10693.0
10717.0
20-SEP-93
FSYS REV. J001 VER. 1.1
945 19-SEP-93
434 20-SEP-93
11307.0
11296.0
10000.0
11285.0
1200.0
TOOL NUMBER
3944XA
3974XA
3517XA
3921NA
1309XA
2435XA
3921NA
3508EA
2222MA/2222EA
3921NA
2806XA
3506XA
8.500
9450.0
0.0
XANVI S KCL
10.00
98.0
9.5
4.4
175.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
0.139
0.057
0.106
0. 000
0. 217
0.000
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
0.000
TOOL STANDOFF (IN):
0.0
REMARKS:
REPEAT PASS.
NEUTRON IS CALIPER CORRECTED.
IS NOT ACTIVE.
$
CHISM FILTERING
CN
WN
FN
COUN
STAT
: ARCO ALASKA INCORPORATED
: D.S. 2 - 16A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
68.0
175.0
68.0
0.0
68.0
0.0
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
GR 2435 68 1 GAPI
CNC 2435 68 1 PU-S
CNCF 2435 68 1 PU-S
CN 2435 68 1 PU-L
LSN 2435 68 1 CPS
SSN 2435 68 1 CPS
TEMP 2435 68 1 DEGF
CHT 2435 68 1 LB
TTEN 2435 68 1 LB
SPD 2435 68 i F/MN
ZDEN ZDL 68 1 G/C3
PORZ ZDL 68 1 PU-S
ZCOR ZDL 68 i G/C3
PE ZDL 68 1 BN/E
HRD1 ZDL 68 I CPS
HRD2 ZDL 68 1 CPS
SFT2 ZDL 68 1 CPS
SHR ZDL 68 1
CAL ZDL 68 1 IN
4 4 08 501 10 0
4 4 98 211 23
4 4 98 211 23 1
4 4 52 326 75 5
4 4 84 023 70 1
4 4 83 368 34 1
4 4 18 487 70 6
4 4 19 912 29 5
4 4 19 912 29 5
4 4 54 376 29 5
4 4 52 443 33
4 4 46 370 25 1
4 4 09 884 61 1
4 4 76 731 33
4 4 15 242 69 1
4 4 14 587 33 1
4 4 78 812 61
4 4 37 715 66 1
4 4 24 115 90 6
76
* DATA RECORD (TYPE# 0)
Total Data Records: 65
966 BYTES *
Tape File Start Depth = 10735.000000
Tape File End Depth = 10543.000000
Tape File Level Spacing = 0,250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
46690 datums
Tape Subfile: 4
146 records...
Minimum record length-.
Maximum record length:
62 bytes
966 bytes
Tape Subfile 5 is type: LIS
93/ 9/23
01
**** REEL TRAILER ****
93/ 9/26
O1
Tape Subfile: 5 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Sun 26 SEP 93 1:22p
Elapsed execution time = 28.23 seconds.
SYSTEM RETURN CODE = 0