Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout193-113PLUGGING~-& LOCATION CLEA~_~-~C~, R~,PORT
State of Alaska
.ALASF~ 0IL & GAS CONSERVATION COM~ISSION
Memcrandu_m To File:
AP i No.
Well }~ame
O~erator
Lccation~L
~ote casing size, wi, depth, c~t vol, & procedurm.
Review the well file, and-c_~m~ent on ptuqqinq, well head
status, and location clearance - provide loc. clear, code.
.:!ugs: La, o
~ ~o' Abo~ loe w,~~- P~o~ ~ ~ T~ z~ooo ps,.
Well head
Earker Dost or plate: . .
Local!on Clear~c.: ~0 -
Siqned~
Code
Date
·
7-0o3
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
F--I Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 93-113
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21924-01
4. Location of well at surface ~ 9. Unit or Lease Name
713' SNL, 1253' EWL, SEC. 19, T11N, R12E ! Prudhoe Bay Unit
At top of productive interval~"~~! 10. Well Number
N/A t~ Z-32A
At total depth : I 11. Field and Pool
3768' NSL, 447' EWL, SEC. 18, T11N, R12E ~
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 88.45'I ADL 028262
12. Date Spudded8/21/93 I 13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 16' N°' °f C°mpleti°ns8/27/93 3/4/97 N/A MSL Zero
17. Total Depth (MD+TVD)10830, 9196 FTII18' Plug Back Depth (MD+TVD)I19' Directi°nal Survey J20' Depth where SSSV set 121' Thickness °f Permafr°st8880 7509 FT, i---] Yes []No N/A MD 1900' (Approx.)
22. Type Electric or Other Logs Run
DLL/GR/AC/CNL
23. CASING~ LINER AND CEMENTING RECORD
CASING SE-I-I-lNG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 110' 32"
13-3/8" 68# L-80 Surface 2668' 17-1/2" 3850 cu ft Permafrost
9-5/8" 47# NT80S Surface 8886' 12-1/4" 2244 cu ft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None N/A
MD TVD MD TVD
26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
Not On Production! N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, g~v~.e~ ~'~ chips.
ORIGINAL
Alaska Oil & Gas Cons° _60¢
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Subsea
Sag River 10086' 8439'
Sh ublik 10124' 8473'
Top of Sadlerochit 10220' 8558'
31. List of Attachments
Summary of Daily Drilling Reports
32. I hereby certify that the f~'~'g~o ng is,~e, and/correct to the best of my knowledge
Signed/ / J/--/ / ~//~/~
Dan Stoltz ~.,,~'~~ ...... Title Senior Drilling Engineer Date
Z-32A 93-113 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
iNSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
03 Mar 97
04 Mar 97
05 Mar 97
06 Mar 97
07 Mar 97
08 Mar 97
PB Z Pad
Progress Report
Well Z-32BL1
Rig Nabors 2ES
Page
Date
Duration
Activity
06:00-02:00
02:00-03:30
03:30-05:00
05:00-06:00
06:00-08:00
08:00-10:00
10:00-14:00
14:00-14:30
14:30-15:00
15:00-16:30
16:30-17:00
17:00-17:30
17:30-18:00
18:00-19:00
19:00-21:00
21:00-21:30
21:30-02:00
02:00-02:15
02:15-03:00
03:00-05:30
05:30-06:00
07:30-09:30
09:30-12:00
12:00-12:30
12:30-13:30
13:30-14:00
14:00-15:30
15:30-18:30
18:30-21:00
21:00-00:00
00:00-00:30
00:30-06:00
08:00-09:30
09:30-12:00
12:00-12:30
12:30-00:00
00:00-00:30
00:30-06:00
07:00-08:00
08:00-08:30
08:30-09:00
09:00-10:30
10:30-11:00
11:00-12:00
12:00-12:30
12:30-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-15:00
15:00-16:30
16:30-17:00
17:00-17:30
20 hr
1-1/2 hr
1-1/2 hr
lhr
2hr
2hr
4hr
1/2 hr
1/2 hr
1-1/2 hr
1/2hr
1/2 hr
1/2 hr
lhr
2hr
1/2 hr
4-1/2 hr
1/4 hr
3/4 hr
2-1/2 hr
1/2 hr
2hr
2-1/2 hr
1/2 hr
lhr
1/2 hr
1-1/2 hr
3hr
2-1/2 hr
3hr
1/2 hr
5-1/2 hr
1-1/2 hr
2-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
lhr
1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
2-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
Rig moved 100.00 %
Removed Hanger plug
Installed BOP test plug assembly
Installed High pressure lines
Removed Xmas tree
Installed BOP stack
Tested All functions
Removed BOP test plug assembly
Removed Tubing hanger
Removed Seal assembly
Installed Seal assembly
Tested Seal assembly
Installed Wear bushing
Made up BHA no. 1
R.I.H. to 2200.0 ft
Circulated at 2200.0 ft
R.I.H. to 8680.0 ft
Circulated at 8680.0 ft
Tested Casing - Via annulus and string
Circulated at 8680.0 ft
Drilled cement to 8700.0 ft
Circulated at 8880.0 ft
Pulled out of hole to 3000.0 ft
Held safety meeting
Serviced Block line
Laid down 930.0 ft of 5in OD drill pipe
Pulled BI-IA
Made up BHA no. 2
R.I.H. to 8880.0 ft
Drilled cement to 8890.0 ft
Held safety meeting
Drilled cement to 8915.0 fl
Worked toolstring at 8880.0 ft
Drilled to 8993.0 ft
Held safety meeting
Drilled to 9336.0 ft
Held safety meeting
Drilled to 9530.0 ft
Circulated at 9583.0 fl
Circulated at 9583.0 fl
Pulled out of hole to 8880.0 fl
Repaired Main engine
R.I.H. to 9583.0 fl
Drilled to 9614.0 fl
Held safety meeting
Drilled to 9893.0 fl
Held safety meeting
Drilled to 10130.0 fl
Drilled to 10265.0 fl (cont...)
Held safety meeting
Drilled to 10329.0 ft
Circulated at 10329.0 ft
Pulled out of hole to 10000.0 ft
Pulled out of hole to 8880.0 fl
1
12 August 97
i;-'iTF,:NXT DATA T DATA ...... P!..U8
....c~3... 113 ~.,r:.762 ~/f/'F 8876 .... i08i8 O1.-I FZNAI..S
.:~<;:} ..... i i3 ~-07 ~R~-c'.~Okip DATE'; 8. .... 3 i ..... 9.¢
93-~i i3 DAXL"/ b/E!..L OP ~./~/;i0/93 TO 8/31/'"9:
93--- 1 i;:: SUEVF. Y ~- lq'.' 8886 .... i08~;0., k~kiSS
93 ..... i 1.3 BHCA/'GR
10050 --- 10,902
8876 .... I(;)787
9.:3---113 SSTVE, ~.L :.'1 .:, i~x"2 ~7550-.-9090
i
r:,/',, y i: .. :: [!! ,:3 V D
........
09/:0'/,/ i99
· i t,/0 <: "1°9;;
.. /, .;;.i
'i '1/'09/ 'i 993
0 g/' '1 '?,J 19 9 ::
.:, 'i /1
09/t i?~/"i99
r~ 9/' i/,/' 'i c, q
.. , ,;;~ ,:.
Ar'e dr'y d"Ct:.ch s,:~mp]es
,,,:,:.s 1;he wel'l cot"ca.-
r' e q u '~ r'e d "?
C O N H E i',..! T S
i'l O
BP EXPLORATION
To:
David W. Johnston
Chairman
Alaska Oil & Gas Commission
From:
Steve Herren, Drlg Mgr
Shared Services Drilling
ARCO Alaska, Inc.
Subject: Suspended wells
Compliance with regulations
in response to your letter dated August. 15, 1994 regarding suspended wells
attached are lists detailing well status and criteria for maintaining these wells
in a suspended status. Plans for well inspections are in place for October 1
through October 3, 1994 as discussed with Blair Wondzell and John
Spaulding. Updated reporting has been filed with the commission as listed.
Yours Sincerely,
Steve Horton
Drilling Manager
Bill Bredar
Patrick Collins
Jim Farnsworth
Mike Miller
Bruce Policky
Scott Sigurdson
Marian Sloan
RECEIVED '
OCT 1 4 1994
Alaska Oil & Gas Cons. Commission
Anchora~a
Suspended Wells, Request to retain suspension status
The following wells are listed as suspended by the AOGCC under 20 AAC
25.110. These wells are requested to remain suspended for the reason(s) as
indicated. Site inspections should be conducted as soon as possible.
MPA-01; 029-20376-00
79-/¢O4
Potential recompletion in the Kuparuk C and/or B
sand as a water injector. Decision hinges on
1994/95 development drilling results (E-13) in
this area.
MPB-02; 029-20662-00
81-/¢142
This well is scheduled for initial completion in the
Schrader Bluff late this year or early next year.
MPA-03; 029-20891-00
83-?001
Future utility as a Schrader Bluff producer with
producing utility when surface infrastructure is
installed on A pad.
MPN-01 B; 029-21053-02
84-0013
N-01B is a usable well in the Schrader Bluff, with
producing utility when surface infrastructure is
installed on N pad. The well should be retained
in a suspended status until that time.
MPC-16; 029-21364-00
85-01 10
C-16 has recompletion potential in the Kuparuk
"C" sand and/or the Schrader Bluff horizons.
Although additional evaluation must be
performed to quantify reserves and production
potential, C-16 is believed to be a viable
workover and/or sidetrack candidate.
NWM#1; 029-22231-00
91-0145
Northwest Milne #1 should remain suspended
until the Northwest Milne Point development is
better defined. The wellbore is strategically
located on a gravel island and may. possess
utility in either production or injection operations.
DNR recently certified this well as capable of
production.
No Point #1; 029-22450-00
94-0027
No Point #1 will be utilized in the upcoming F-
Pad development. Expectations are to complete
the Kuparuk "A" zone and commence production
4Q95.
Niakuk #4, 029-21217-00
84-0200
Niakuk #4 is requested to remain suspended
until the viability of the well for monitoring is
defined.
Niakuk #5, 029-21290-00
85-0O27
Niakuk #5 should remain suspended for
observation purposes at this time.
Sag Delta #33-12-16, 029-20176-00
75-0058
Area being drained by 1994 Alapah well NK-26
(HAW). Potential use as a monitor well for this
new reservoir
Would have to truck oil across winter ice road if
resume production
Produced 186 MBO in 1985 2 month production
test.
Sag Delta #5, 029-20527-00
80-0129
Area being drained by L5-26 (high gas well),
L5-28, and L5-36 from south to west.
Well tests indicated fairly tight, but productive
rock; perhaps inadequate stimulation?
Costs prohibitive for eventual tie-in to L5 (? via
Heald Point). Potential for gas cap monitor well
Sag Delta 31-11-16, 029-2001
69-0014
1-00
Area being drained by L4-36, 80 Acre offset to
NW. Potential for service well (water injection?)
Well is capable of production, but most Lisburne
in water leg and costs likely prohibitive for tie-in
to L4.
Sag Delta #2A, 029-20234-01
77-0069
South of Sag Delta #1, in water leg of Alapah oil
accumulation in NK-26 well. Remote potential
for pressure monitoring of Alapah offtake and
the effect on the Alapah aquifer; though, costs
would likely be prohibitive.
Sag Delta #8, 029-20519-00
80-0121
Z-32A, 029-21924-01
93-0113
S-10A, 029-20765-01
91-0123
Sag Delta #8 should remain suspended until the
development plan for the area is better defined.
This well may possess utility for production or as
an observation well.
Z-32 was shut in due to high water production in
1992. In 1993 it was sidetracked to a new
location. The oil column at the new location was
less than prognosed and was not considered
economic and the well was suspended. There is
oil in the area that can be reached as a new
sidetrack from this well. A specific location has not
yet been identified, but we wish to retain this
wellbore for a future sidetrack.
S-10 was sidetracked in 1992. Drilling difficulties
were encountered while drilling through a fault in
the Kingiak and the well was suspended. There is
oil in the area that can be reached as a new
sidetrack from this well. A specific location has not
yet been identified, but we wish to retain this
wellbore for a future sidetrack. The West Sak
formation, a non unitized formation in the PBU
license area, is reachable from this wellbore.
Work in ongoing on a facility sharing agreement.
In the case that a satisfactory agreement is
reached, this wellbore could be used to access oil
in this formation.
Y-22A, 029-21558-01
88-O 115
Y-22 was sidetracked in 1988. The sidetrack was
suspended due to drilling difficulties. There is oil
in the region that can be reached as a new
sidetrack from this well. A location has not been
worked on but we wish to retain this wellbore for a
future sidetrack.
U-01, 029°22244°00
92-0011
There is oil in the area that can be reached as a
new sidetrack from this well. A specific location
has not yet been identified, but we wish to retain
this wellbore for a future sidetrack.
PR 33-12-13, 029-20047-00
69-01 04
The well penetrates The West Sak and Ugnu
formations in the aquifer. Work in ongoing on a
facility sharing agreement with subsequent
appraisal of the formations. This well could be
used to test the aquifer properties.
These wells are listed as suspended, action items are detailed.
Ak Island #1,289-20018-00
81-0119
Alaska Island #1 was abandoned in 1988. The
completion notice has been refiled with AOGCC
on 9/15/94. The site is ready for inspection
(priority 1 ).
Niakuk #lA, 029-20156-01
76-0028
Niakuk #lA was abandoned in 1991. A sundry
application requesting status change was filed
with AOGCC 9/20/94. A completion notice will
follow when the sundry application is approved.
The site is ready for inspection (priority 1 ).
Niakuk #2A, 029-20180-01
76-0079
Niakuk #2A was abandoned in 1991. A sundry
application requesting status change was filed
with AOGCC 9/20/94. A completion notice will
follow when the sundry application is approved.
The site is ready for inspection (priority 1).
PBU H-01, 029-20099-00
71-0015
The well was drilled in 1971 and hit a down
thrown fault block with only 20ft of oil bearing
Ivishak. This was not economic at the time. It was
left suspended without tubing. Recent success in
fraccing the Sag formation indicated that it might
be an economic well. A rig workover was
completed in April 1994 and the well was put on
production 9/94. It is not necessary to inspect this
site.
Kemik Unit #1,223-20006-00
70-0060
Kemik Unit #1 is scheduled to be abandoned in
the near future. Abandonment planning is now in
progress. Site inspection will not be necessary at
this time most likely should be scheduled for
Spring of 1995.
P2-59, 029-22096-00
90-0140
Arco Alaska Inc. is the operator of this well, they
will be addressing the question of suspension.
Sag Delta #3, 029-20233-00
79-0080
Well plugged and abandoned March, 1991. Well
completion notice will be refiled with the
Commission.
Sag Delta #4, 029-20245-00
77-0015
Well plugged and abandoned March, 1991. Well
completion notice will be refiled with the
Commission.
The following wells are not under BP Exploration ownership. A letter
requesting the owners to respond regarding their wishes for these wells was
sent on 9/30/94.
MP 03-10-12, 029-20483-00
8O-OO66
MP 33-11-12, 029-20504-00
80-OO92
CHEV 18-11-12, 029-20511-00
80-0108
Term C 03-11-12, 029-20356-00
78-0102
MP 22-31-11-13, 029-20545-00
81-0010
MP 43-31-11-13, 029-20536-00
80-0139
MP 30-11-13, 029-20546-00
80-0152
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: David Jo~~ DATE: October 2, 1994
~--~
Chairrrra-n
THRU: Blair Wondzell, ~5',.0_,.,.~.- FILE NO: 2991jbbd.doc
P. I. Supervisor
FROM: John Spaulding,~. SUBJECT:
Petroleum Insp. ~;,~ -~ ~
Suspended Wells Inspection
North Slope, Alaska
October 1,2&3. 1994:. I accompanied Marian Sloan BPX representative on an
inspection tour of BPX suspended wells at various North Slope locations. Travel was by
pickup and helicopter.
Marian Sloan Informed me that BPX is drafting a program with reasons for leaving wells
listed below as suspended, this program will be available to the AOGCC in the very
near future
Oct. 1,1994
Y-22A / PBU / PTD 88-11.5; well head on configuration, no pressure on tubing or
annulus, area very clean, well is located on a producing drillsite.
S-10A / PBU / PTD 91-123; wellhead on configuration, no pressure on tubing or
annulus, area clean, well. is located on a producing drillsite.
U-01 / PBU / PTD92-11; wellhead on configuration, no pressure on tubing or annulus,
area clean, well is located on a producing drillsite.
Z-32A / PBU / PTD 93-113; wellhead on configuration, no pressure on tubing, 750 psi
on inner annulus, 0 pressure on outer annulus, area clean, well is located on producing
drillsite.
Chevron 18-11-12 / PTD 80-108; wellhead on configuration, no pressure on tubing or
annulus, area clean.
MP 22-31-11-13 / PTD 81-10; wellhead on configuration, no pressure on tubing or
annulus, area clean, reserve pit is still open.
MP 32-30-11-13 / PTD 80-152; wellhead on configuration, no pressure on tubing or
annulus, area clean, reserve pit is still open.
Oct. 2, 1994:
A-01 / MPU / PTD 79-40; wellhead is removed with casing hanger still on, area clean,
well is located on a active drillsite.
A-03 / MPU / PTD 83-01; wellhead on configuration, no pressure on tubing or annulus,
area clean, well is located on a active drillsite.
B-02 / MPU / PTD 81-142; wellhead on configuration, no pressure on tubing or
annulus, area clean, well is located on a producing drillsite,
C-16 / MPU / PTD 85-116; wellhead on configuration, no pressure on tubing or
annulus, area clean, well is located on a producing drillsite.
N-01B / MPU / PTD 84-13; wellhead on configuration, no pressure on tubing or
annulus, area clean with timbers covering the cellar area and well guard around the
wellhead.
No Point ¢1 / MPU / PTD 94-27; wellhead on configuration, area clean, unable to land
helicopter to check wellhead for pressures, No Point ¢1 is scheduled to become part of
the F- pad construction at MPU.
NW Milne ¢1 / MPU / PTD 91-145; wellhead on configuration, area clean, island is
suffering from severe erosion on the North side.
Oct. 3, 1994:
Sa.q Delta 31-11-16 / PTD 69-14; wellhead on configuration, area clean, has wooden
location marker, no pressure on tubing or annulus.
SaR Delta ¢3 / PTD 76-80; wellhead on configuration, area clean no pressure on tubing
or annulus.
.S.a.q Delta #.4 / PTD 77-15; wellhead on configuration, area clean, no pressures on
tubing or annulus.
Sa.q Delta ¢2A / PTD 77-69; wellhead on configuration, no pressures on tubing or
annulus, timbers and cellar box material, reserve pit open.
.Sa,q Delta ¢5 / PTD 80-129; no wellhead; bell shaped affair was covering the supposed
well surface location, area clean.
Sa.q Delta #8 / PTD 80-121; wellhead on configuration, timbers and well guard, island
is eroding.
Alaska Island #1 / PTD 81-119; unable to land, area appeared clean from the air,
marker post visible on South side of island.
Niakuk #-,4 / PTD 84-200; wellhead on configuration, concrete river weights, cellars
open, island eroding.
Niakuk #5 / PTD 85-27; wellhead on configuration, concrete river weights, cellars open,
island eroding.
Location Clearances;
Ni.akuk #lA / PTD 76-28; area is clean, no visible marker post, island is eroding as
planned.
(;N, iakuk #2A / PTD 76--79;...area-is-clean;-no-visible-marker--post; .island-is-eroding as
planned.
I recommend that the AOGCC consider Niakuk lA & 2A for final abandonment and
location clearance.
Summary:.. I inspected locations of 28 BPX suspended wells. I also inspected 2 wells
for final abandonment and location clearances.
ALASKA OIL AND GAS
CONSERVATION COMMISSION
r.
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
August 15, 1994
Steve Horton, Drlg Mgr
BP Exploration (Alaska) Inc
P O Box 196612 (MB12-1)
Anchorage, AK 99519-6612
Re:
Suspended Wells
Compliance with regulations
Dear Mr. Horton:
BP Exploration and the predecessor Sohio companies have several
suspended wells as shown on the attached lists: BP SUSPENDED WELLS
PRIOR TO 1980 and BP SUSPENDED WELLS SINCE 1980.
The applicable regulation is as follows:
20 AAC 25.110 SUSPENDED WELLS (a) Upon application by the
operator under 20 AAC 25.t05(e), the commission, will, in its
discretion, approve the suspension of a well if the well
(1) encounters hydrocarbons of sufficient quality and
quantity to indicate the well is capable of producing in
paying quantities as reasonably demonstrated by well tests
or interpretive formation evaluation data; or
(2) is reasonably demonstrated to have future value as a
service well.
For each well on the attached lists of suspended wells, please provide
data showing that the well meets the criteria of (1) or (2) above, or
advise as to your plans to abandon the well.
Wells that meet the criteria of (a) above that you wish to maintain as
suspended, as r~ui-re_d~by 20 AAC 25.110(e), must have well site
inspections ~is yej~r~~to snow covering the locations.
Chairman - '"".~
'"--~._
Attachments
c: Blair Wondzell
bew/1 lbpsusp
:/15/94 BP SUSPENDED WELLS SINCE 1980 PAGE 1
AUGUST 1994
PERMIT
79-0040-0
80-0066-0
80-0092-0
80-0108-0
80-0121-0
80-0129-0
80-0139-0
80-0152-0
81-0010-0
81-0119-0
81-0142-0
83-0001-0
84-0013-0
84-0200-0
85-0027-0
85-0110-0
88-0115-0
90-0140-0
91-0123-0
91-0145-0
92-0011-0
93-0113-0
94-0027-0
API NUMBER
029-20376-00
029-20483-00
029-20504-00
029-20511-00
029-20519-00
029-20527-00
029-20536-00
029-20546-00
029-20545-00
089-20018-00
029-20662-00
029-20891-00
029-21053-02
029-21217-00
029-21290-00
029-21364-00
029-21558-01
029-22096-00
029-20765-01
029-22231-00
029-22244-00
029-21924-01
029-22450-00
WELL WELL
WELL NAME CLASS STATUS
MILNE POINT UNIT A-01 EXP SUSP
PRUDHOE BAY UI~IT 3-10-12 DEV SUSP
PBU MP 11-33-11-12 I DEV SUSP
PRUDHOE BAY UI~IT TR 18-11-12 DEV SUSP
SAG DELTA 8 EXP SUSP
SAG DELTA 5 EXP SUSP
PRUDHOE BAY UNIT 31-11-13 DEV SUSP
PBU MP 32-30-11-13 1 DEV SUSP
PBU MP 22-31-11-13 2 DEV SUSP
ALASKA ISLAIqD 1 EXP SUSP
MILNE POINT UNIT B-02 DEV SUSP
MILNE POINT UI~!T a-03 DEV SUSP
MILNE POINT I/NIT N-01B DEV SUSP
NIAKUK 4 EXP SUSP
NIAKUK 5 EXP SUSP
MILNE POINT I/NIT C-16 DEV SUSP
PRUDHOE BAY LrNIT Y-22A DEV SUSP
PT MCINTYRE P2-59 EXP SUSP
PRUDHOE BaY UNIT S-10A DEV SUSP
NORTHWEST MILNE 1 EXP SUSP
PRUDHOE BAY I/NIT U-01 DEV SUSP
PRT-TDHOE BAY LrNIT Z-32A DEV SUSP
NO POINT 1 DEY SUSP
STATUS
DATE
4/15/80
10/11/80
4/29/81
12/24/80
4115/81
4/13/81
2/20/81
1/18/81
2/14/81
6/08/82
5/27/82
12/10/83
4/27/84
2/17/85
4118/85
10/27/93
10/29/88
12/22/90
11/06/91
3/30/92
3/16/92
8/31/93
4/08/94
SECT
23
33
33
O7
27
36
O5
30
3O
11
19
23
3O
25
25
10
33
14
35
25
18
19
O6
TWP
13N
llN
11N
12N
12N
10N
11N
11N
10N
13N
13N
13N
12N
12N
13N
llN
12N
12N
14N
llN
lin
13N
R~JG
010E
012E
012E
012E
016E
015E
013E
01BE
013E
022E
011E
010E
010E
015E
015E
010E
013E
014E
012E
009E
013E
012E
010E
MER
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
3/15/94 BP SUSPENDED WELLS PRIOR TO 1980 PAGE 1
AUGUST 1994
PERMIT
69-0014-0
69-0104-0
70-0060-0
71-0015-0
75-0058-0
76-0028-0
76-0079-0
76-0080-0
77-0015-0
77-0069-0
78-0102-0
API NUMBER
029-20011-00
029-20047-00
223-20006-00
029-20099-00
029-20176-00
029-20156-01
029-20180-01
029-20233-00
029-20245-00
029-20234-01
029-20356-00
WELL WELL
WELL NAME CLASS STATUS
SAG DELTA 31-11-16 EXP SUSP
PRUDHOE BaY UNIT 33-12-13 DEV SUSP
KEMIK UNIT 1 DEV SUSP
PRUDHOE BAY UNIT H-01 DEY SUSP
SAG DELTA 33-12-16 EXP SUSP
NIAKUK 1-A EXP SUSP
NIAKUK 2-A EXP SUSP
SAG DELTA 3 EXP SUSP
SAG DELTA 34633 4 EXP SUSP
SAG DELTA 28337 2-a EXP SUSP
PRUDHOE BAY UNIT TERM C DEV SUSP
STATUS
DATE
4/28/69
12/20/69
6/17/72
6/22/71
4/28/76
4/30/76
3/30/77
3/23/77
3/22/78
12/27/77
4/25/79
SECT
31
33
17
21
O4
26
26
35
35
10
O3
TWP
llN
12N
01N
llN
12N
12N
12N
12N
11N
~NG
016E
013E
020E
013E
016E
015E
015E
016E
016E
016E
012E
MER
U
U
U
U
U
U
U
U
U
U
U
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RI:COMP LETION REPORT AND LOG
I1. Status of Well Classification of Service Well
2. Name of Operator 7.9
BP Exploration
3. Address 3. APl Num (~
P. O. Box 196612, Anchorage, Alaska 99519-6612 so-029-21924-01
4. Location of well at surface 9. Unit or Lease Name
713'SNL, 1253'EWL, SEC. 19, T11N, R12E F~i 10.Prudh°eBayUnitwell Number
At Top Producing Interval j ......
Z-$2A(12-18-11-12)
N/A
At Total Depth"~ 'ii ~, ~--,~t Prudhoe Bay Field/Prudhoe Bay Pool
$768'NS1_, 447'EWL, SEC. 18, T11N, R12E
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No.
KBE = 88.45' I ADL 28262
12. Date Spudded 13. Da~e T.D. Reached 14. Date Comp., Susp. c~ Aband. 115. Water Depth, if offshore 116. No. of Completions
8/21/93 8/27/93 8,/31/93I N/A feet MSL I Zero
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
10850' MD/9196' TVD 8670' MD/-/350' MD YES [] NO []! N/A feet MD ! 1900' (Approx.)
22. Type Electric or Other Logs Run
DLL/GR/A C/CNL
23. CASING, LINER AND CEMENTING ~
SE3-FING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENI'ING RECORD AMOUNT PULLED
20" Conductor Surface 110' 32'
15-$/8" 68# L-80 Surface 2668' 17-1/2" $850 cuft Permafrost
9-5/8" 47# NTSOS Surface 8886' 12-1/4" 2244 cuft Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBblGRECORD
interval, size and number) SIZE DEPTH SET{MDI PACKER SET {MD)
None Ijt 4-1/2" 40' None
26. ACID, FRACTURE, CEMENT SQUEEZ~ ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAl_USED
Top @ 9924' 365 sx C/ass 'G"
Top ~ 8670' 130 sx C/ass 'G"
'27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
Not on production I N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESI ZE IGAS-OIL RATIO
TEST PERIOD I~
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
N0V - 9 1993
~t~.ska 0~t & (;as Cons. Commission
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS F(.,'RMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity.
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
Top Sag River 10086' 8439'
Shublik 10124' 8473'
Top Sadlerochit 10220' 8558'
RECEIVED
N0V - 9 199
AtP~$ka. 0il & Gas Cons. Commission
Anchorage
31. LIST OF ATTACHMENTS
is true and correct to'he best of my knowledge,~.~/f,,,/~//~/.~/././lCi
32. I hereby certify that thQfor~going
Signed ' ~'' - /x , [ Title Drilling EngineerSuoervisor Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: Z-32A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-029-21924
PERMIT:
APPROVAL:
ACCEPT: 08/14/93 02:00
SPUD: 08/21/93 09:30
RELEASE:
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
08/10/93 ( 1)
TD: 0
PB: 0
MOVING RIG
PREP RIG MOVE.
MW: 0.0
08/11/93 (2)
TD: 0
PB: 0
MOVING RIG MW: 0.0
MOVING RIG.
08/12/93 (3)
TD: 0
PB: 0
RIG MOVE MW: 0.0
MOVING RIG.
08/13/93 (4)
TD: 0
PB: 0
MOVING RIG MW: 0.0
MOVING RIG.
08/14/93 ( 5)
TD: 0
PB: 0
REPAIRS MW: 0.0
MOVE RIG TO END OF PAD. BEGIN REPAIR WORK.
08/15/93 (6)
TD: 0
PB: 0
08/16/93 (7)
TD: 9980
PB: 9980
NU ND MW: 8.5 Seawater
--
FINISH REPAIR. ACCEPT RIG 8-14-93 @ 14:00 HRS. STACK BOP &
SUB. MOVE RIG OVER WELL. CIRC. PULL BPV, CIRC. SET 2 WAY
CK. NU ND TREE, BOPE.
--
RU & TEST BOPE. MW: 8.5 Seawater
RU & PULL TBG. TEST RAMS. POH. RU TO TEST BOP'S.
08/17/93 ( 8)
TD: 9980
PB: 9100
MIXING PILL MW:10.0 KC1
RU & TEST BOP. SET WEAR RING. PU DP & RIH. SET RETAINER,
TEST CSG. CHG OVER TO MILL FLUID. MIXING PILL.
REC£1VED
NOV -9 1993
Oil & Gas Cons. Commission
Anchorage
WELL : Z-32A
OPERATION:
RIG : DOYON 14
PAGE: 2
08/18/93 ( 9)
TD: 8886
PB: 8891
POH MW:10.1 KC1
POH, LDDP. MU MILL & RIH. CUT SECT. LOST POWER. PUMP DRY
JOB. POH. CHG SECT. MILL.
08/19/93 (10)
TD: 8936
PB: 8891
CIRC & CLEAN HOLE MW:10.1 KC1
POH W/SECT MILL. CBU, POH. LD MILL. RIH, FILL PIPE. CUT
SECTION. CIRC & CLEAN HOLE.
08/20/93 (11)
TD: 8936
PB: 8936
08/21/93 (12)
TD: 8936
PB: 8936
08/22/93 (13)
TD: 8946' (8946)
08/23/93 (14)
TD: 8982' ( 36)
08/24/93 (15)
TD: 9520' ( 538)
08/25/93 (16)
TD:10112' ( 592)
08/26/93 (17)
TD:10335' ( 223)
08/27/93 (18)
TD:10815' ( 480)
RIH MW:10.1 KC1
CONT CIRC, POH. PUMP DRY JOB, POH. B/O LDS ON WEAR RING &
PKOFF. LD BHA. RUN PKOFF, WOULD NOT GO. RIH. PU STORM PKR,
SET. ND BOP. REPLC PKOFF. TEST. CONT RIH.
RIH. MW:10.1 KC1
RIH TO TOP SECTION. CIRC. REV CIRC. PUMP 20 BBLS WATER,
170 SX (166 CU FT) 'G' CMT, 5 BBLS WATER. DISP W/ MUD.
POOH 10 STDS. SQZ CMT W/ 1500 PSI. SQZ'D 3.5 BBLS CMT.
POOH. CLEAN BOPE. TEST BOPE. RIH W/ BHA.
DRLG. MW:10.0 VIS: 48
RIH. TAG CMT @ 8741' CLEAN OUT CMT TO 8888' KICKOFF @
09:30 HRS, 8/21/93. DRLG F/ 8888'-8946'
POOH. MW:10.0 VIS: 50
DRLG F/ 8946'-8961' CHANGE OVER TO BIOZAN. POOH. CHANGE
BIT. RIH. CIRC. WASH TO BTM. DRLG F/ 8961'-8982' POOH
WET.
DRLG. MW:10.0 VIS: 50
CHANGE OUT MTR, MWD. RIH. REAM TO BTM. DRLG F/
8982'-9520'
DRLG. MW: 9.9 VIS: 53
DRLG F/ 9520'-9707'. CIRC. SHORT TRIP 10 STDS. DRLG F/
9707'-10112'.
DRLG.
DRLG F/ 10112'-10144'
REAM F/ 10080'-10144'
MW:10.0 VIS: 55
CBU. POOH. CHANGE BIT, BHA. RIH.
DRLG F/ 10144'-10335'.
DRLG.
DRLG F/ 10335'-10815'
MW: 9.9 VIS: 47
08/28/93 (19)
TD:10830' ( 15)
RIH W/BHA MW:10.1 VIS: 59
DRLD TO 10830. CIRC. WASH & REAM. CIRC. POH. RU & RUN LOGS.
RIH.
RECEIVED
NOV - 9 1995
~ska Oil & (~as Cons. Commission
~nc/mrage
WELL : Z-32A
OPERATION:
RIG : DOYON 14
PAGE: 3
08/29/93 (20)
TD:10830' ( 0)
08/30/93 (21)
TD:10830' ( 0)
08/31/93 (22)
TD: 8670
PB: 0
RIH OPEN ENDED W/5" DP MW:10.3 VIS: 59
RIH, WASH & REAM. CIRC COND MUD. DROP SURV & POH. RU & RUN
CNL LOG. LDBHA. RIH OPEN ENDED.
DISPLC MUD W/SW MW:10.6 VIS: 46
SERV RIG. RIH W/DP, CBU FOR CMT PLUG. MIX & PUMP CMT. RIH
TO TOC. CIRC. MIX & SPOT PILL. POH. CIP. POH. REV OUT.
DISPLC MUD W/SW.
RIG RELEASED. MW: 8.5 Seawater
DISP WELL W/ SEAWTER. L/D DP. RIH. DISP TOP 2000' W/
6200 GAL DIESEL. L/D DP. P/U TBG HGR, 1 JT 4-1/2" TBG.
N/D BOPE. N/U TREE. TEST TREE. SECURE WELL. RIG
RELEASED @ 22:00 HRS, 8/30/93.
SIGNATURE:
(drilling superintendent)
DATE:
RECEIVED
NOV - 9 ]995
~aska Oil & Gas Cons. Commission
Anchorage
SP '~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/Z-32A
500292192401
COMPUTATION DATE' 9/ 7/93
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN DIREC~ON
DEPTH DEPTH DEPTH DG MN DEGREES
DATE OF SURVEY' 082893
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER' AK-EZ-30059
KELLY BUSHING ELEV. = 91,10
OPERATOR' BP EXPLORATION
FT.
DLS TOTAL
RECTANGULAR COORDINATES
DG/IO0 NORTH/SOUTH EAST/WEST
VERT,
SECT.
8886 7515.14 7424.04 45 17 N 5,09 W .00 3528.90N 927.78W
8946 7558.58 7467,48 42 18 N 4.00 W 5.13 3570,42N 931.09W
9040 7630,93 7539.83 37 27 N 2,00 W 5,31 3630.79N 934.31W
9132 7705,73 7614.63 33 16 N .22 W 4.69 3683,87N 935,38W
9225 7784.78 7693.68 '31 7 N 2,01 E 2.63 3733.65N 934.63W
3637.41
3678.86
3738,85
3791.28
3840.13
9'319 7864.84 7773.74 30 54 N 2.20 E .26 3781.75N 932,87W
9412 7945.38 7854.28 30 41 N 2.83 E .41 3829.71N 930,76W
9506 8026.04 7934.94 29 58 N 4.22 E 1.07 3876.82N 927.86W
9599 8106,00 8014.90 30 55 N 6.77 E 1,73 3923.60N 923.34W
9691 8185,64 8094.54 31 0 N 9.66 E 1,60 3970.89N 916.51W
3887.16
3933.99
3979.84
4025.09'
4070.42
9786 8266.32 8175.22 31 12 N 12.31 E 1,47 4018,67N 907.24W
9880 8347,63 8256.53 29 42 N 12.07 E 1.59 4065.41N 897.14W
9973 8429.53 8338.43 27 7 N 12.12 E 2.78 4108.74N 887,86W
10067 8513,06 8421.96 26 48 N 12,12 E .34 4150.29N 878.93W
10160 8595.85 8504,75 26 33 N 12.96 E .49 4190.90N 869,90W
10252 8678.22 8587.12 26 48 N 12.63 E .32 4231.28N 860.73W
10345 8761,50 8670,40 26 48 N 12.45 E ,09 4272,36N 851,59W
10438 8844.24 8753.14 26 47 N 12.40 E .03 4313.17N 842,60W
10530 8926.96 8835.86 26 36 N 12.57 E .22 4353,79N 833,61W
10623 9010,21 8919,11 25 58 N 12.33 E ,69 4393.95N 824,75W
4115.80
4160.02
4201.02
4240.33
4278.71
4316.82
4355,64
4394.21
4432.60
4470,55
10717 9094.31 9003.21 25 38 N 12.05 E .37 4433.71N 816.16W
10747 9121,97 9030,87 25 40 N 11.98 E .13 4446.71N 813.39W
10789 9159,95 9068,85 25 31 N 11.95 E .36 4464.50N 809.62W
10830 9196.13 9105,03 25 31 N 11.95 E .00 4481,41N 806.04W
4508.16
4520.47
4537.31
4553.32
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4553.32 · FEET
AT NORTH 10 DEG. 11 MIN. WEST AT MD = 10830
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 349.80 DEG.
Date ! / ?
SPerRY-SUN DRZLLZNG SERVZCES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRZLLZNG
PBU/Z-32A
500292192401
NORTH SLOPE
COMPUTATZON DATE: 9/
7/93
DATE OF SURVEY: 082893
JOB NUMBER: AK-EZ-30059
KELLY BUSHZNG ELEV. = 91.10
OPERATOR: BP EXPLORATZON
TNTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTZCAL VERTZCAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDZNATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTZCAL
DZFFERENCE CORRECTZON
88R6 7515.14 7424.04 3528.90 N 927.78 W 1370.86
9886 8352,38 8261,28 4068,05 N 896,57 W 1533.62 162,76
10830 9196.13 9105,03 4481,41 N 806.04 W 1633.87 100,25
THE CALCULATZON PROCEDURES ARE BASED ON THE USE OF
THREE-DZMENSZON MZNZMUM CURVATURE METHOD.
FT.
' " PAGE 3
SF ...."RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PRUDHOE BAY DRILLING
PBU/Z-32A
500292192401
NORTH SLOPE
COMPUTATION DATE: 9/
7/93
DATE OF SURVEY: 082893
JOB NUMBER: AK-EI-30059
KELLY BUSHING ELEV. = 91.10 FT,
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8886 7515.14 7424.04 3528.90 N 927.78 W 1370.86
8989 7591,10 7500.00 3598,80 N 932.86 W 1398,29 27,43
9114 7691,10 7600.00 3674.08 N 935.30 W 1423.55 25.26
9233 7791,10 7700,00 3737.47 N 934.50 W 1441,98 18.43
9349 7891.10 7800.00 3797,46 N 932.26 W 1458.61 16.64
9465 7991,10 7900.00 3856,71 N 929.35 W 1474,89 16.28
9581 8091,10 8000,00 3914,73 N 924.40 W 1490.62 15,73
9698 8191,10 8100.00 3974,12 N 915.96 W 1507.24 16.62
9815 8291.10 8200.00 4033.34 N 904.04 W 1524.07 16.84
9930 8391.10 8300.00 4088,97 N 892.10 W 1539.14 15.07
10042 8491.10 8400,00 4139.44 N 881.26 W 1551.68 12.54
10154 8591.10 8500.00 4188,59 N 870,43 W 1563.63 11,95
10266 8691.10 8600.00 4237,63 N 859.31 W 1575.56 11.93
10378 8791,10 8700,00 4286,96 N 848.37 W 1587.60 12,04
10490 8891.10 8800,00 4336,26 N 837.52 W 1599.62 12.02
10602 8991,10 8900.00 4384.85 N 826.73 W 1611,33 11.71
10713 9091,10 9000.00 4432.20 N 816,48 W 1622.44 11,12
10824 9191.10 9100.00 4479.05 N 806.54 W 1633.32 10,88
10830 9196,13 9105.03 4481.40 N 806.04 W 1633,87 .54
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
STATE OF ALASKA ~"'~"~
ALA~. ,,~ OIL AND GAS CONSERVATION COMMISSIL., - ~'~ ~ii'"~~ ~
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request; Abandon __ Suspend ~,~',V~ Operation Shutdown '~'~ Re-enter suspended well__
Alter casing Repair well Plugging ' Time extension Stimulate
Change approved program __ Pull tubing __ Variance __ Perforate __ Other __ /
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
BP Exploration Development x KBE = 88.45 feet
Exploratory __
3. Address Stratigraphic__ 7. Unit or Property name
P. O. Box 196612, Anchorage, Alaska 99519-6612 Service__ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
713' SNL, 1253' EWL, SEC. 19, T11N, R12E Z-32A
At top of productive interval 9. Permit number
N/A 93-113
At effective depth 10. APl number
2672'NSL, 348'EWL, SEC. 18, T11N, R12E 50- 029-21924-01
At total depth 11. Field/Pool
3776' NSL, 435' EWL, SEC. 18, T11N, R12E Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured 10830 feet Plugs (measured) Cement top @ 9924' MD-365 sx Class "G'
true vertical 9192 feet Cement top est. @ 8670'MD-130 sx Class "G"
Effective depth: measured 8670 feet Junk (measured)
true vertical 7356 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 110' 20" 147' 147'
Su dace 2631' 13-3/8" 3850 cu ft PF 2668' 2668'
Intermediate 10355' 9-5/8" 2244 cu ft Class 'G" 8886' 7515'
Production
Liner
Perforation depth: measured None
RECEIVED
true vertical
OCT 5 1993
Tubing (size, grade, and measured depth) None
.Alaska U/I & Gas Cons. Commission
Packers and SSSV (type and measured depth) None Anchorage
13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch ~
14. Estimated date for commencing operation 15. Status of well classification as:
16. If proposal was verbally approved Oil x Gas ~ Suspended __
Name of approver D. Amo~ 8/29/93 Date approved Service
17. I hereby ;ertify_.ti~tt'~e forr,~going is true and correct to the best of my knowledge.
Signed ,,~ , ~' ~ t~_~ ,e Drilling Engineer Supervisor Date
FO~ COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness I Approval No. q,~ _ ,~
Plug integrity__ BOP Test~ Location clearance ~
Mechanical Integrity Test Subsequent form required 10-/./~ ~,ppro¥cd Copy
~"/ Returne¢~
Origin~I
Approved by order of the Commission David W. Johnston -~ion--h"~ Date ~'- ~//f,,~f~ ~
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
BP EXPLORATION
ARCO Alaska, Inc.
Prudhoe Bay Drilling
To' Russ Douglass, AOGCC
From' J.E. Robertson
Prudhoe Bay Drilling
Subject' Z-32A NOTIFICATION
TO
Date: Thursday, October 14,1993
SUSPEND WELL OPERATIONS
FOLLOWUP
On 29AUG93 well Z-32A was logged with ATLAS WIRELINE and it was
discovered that there was no light oil column in the well. The decision was
made to suspend well operations and a verbal variance was granted by
AOGCC to suspend operations. It is felt the wellbore will be re-entered within
the next year and a new bottom hole location will be found to be used as a
possible injection well.
The well operation suspension plan was verbally reviewed with and
approved by AOGCC. The plan - as was implemented -is outlined below:
,
Lay 365 sack Class 'G' cement plug from TD at 10,830' md to 350'
above the Sag River formation (highest hydrocarbon zone in open
hole) at 10,086' md. After plug sets up make tag run and have
witnessed by AOGCC.
Top of cement was tagged w/15,000 lbs at 9924'md. Top of
Sag River is at 10,086' md therefore have +162' of plug. Tag
was witnessed by Doug Amos of AOGCC.
,
Spot a 17 ppg pill from top of cement plug to 100' below the bottom
of the window.
.
Displace rest of well with inhibited seawater.
.
Lay 130 sack Class 'G' cement plug from 100' below the bottom of
the window to 200' above the top of the window.
.
Pressure test wellbore to 2000 psi. Pull out of hole and lay down
drillpipe. Displace top 2,000' of well with diesel. Finish POOH
LDDP.
.
Run 1 joint of tubing, dummy hanger, and dry hole tree. Test tree.
Secure well and release rig.
if there are any questions or for further information contact J. E. Robertson at
564-5510.
CC:
M. Zanghi (MB 12-1)
J A Willoughby (MB 12-1)
Z-32A Wellfile
Bixby / Fards (BP Senior wireline co-ordinator)
David Campbell (MB 9-2)
RECE V : D
OCT ! 5 1993
,&iaska Oil & Gas Cons. OornmissiO';
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 09/08/93
T~ 84986
BPX/PBU~LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
Z-32A BHC/k/~ 08/28/93 #1
Z-32A CNL/G~ 08/28/93 ~1
Z-32A SS TVD 08/28/93 ~1
Z-32A DLL~C,~ [%~ 08/28/93 #1
10050.00-10818.00 ATLAS ~ "
10050.00-10802.00 ATLAS 2/5"
7550.00- 9090.00 ATLAS 1/2"
8876.00-10787.00 ATLAS 2/5"
Information Control
Well Records
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P,O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 09/02/93
T# 84965
BPX/PBU~APE W/LISTING
Enclosed is your copy of the materials listed
questions, please contact BP Well Records at
Z-32A
Information Control
Well Records
below. If you have any
(907) 564-4004.
08/28/93 ~ 8876.00-10818.00 ATLAS
RECEIVED
Oil & ~ C~n~. Commission
Anchorage
MEMORANDUM
S TA TE Ok ALASKA
ALAS~ OIL AND GAS CONSER VA TION COMMISSION
TO: David Johnst~
Chairma~'r'~'
THRU: Blair Wondzell
P.I. Supervisor
FROM: Doug Amos~
Petroleum Inspector
DA TE: August 29, 1993
FILE NO: oighh3ab. DOC
PHONE NO.: 279-1433
SUBJECT:
Cement Plug
BPX PBU Z - 32A
Prudhoe Oil Pool
PTD No. 93-113
Sunday AuQu.st 29, 1993: I traveled this date to BPX PBU Z- 32A well to witness the tagging
of the open hole P & A cmt. plug set from 10,830' to 9924', the plug was tagged with 17,000
pounds of drill string weight.
The well will be freeze protected and a dry hole well head installed until the decision is made
whether to plug back to surface or redrili the bottom hole location.
IN SUMMARY, witnessed the tagging of Open Hole Cmt. Plug on BPx PBU Z- 32A well.
Attachment; OIGHH3AB.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Plug And Abandonment Report
Operator: BPX
Operator Rep.: Dink Heim
Lease No.:
Well No.: Z-32A Sec. T-R
Total Depth: 10,830
Date: 8/29/93
Well Name: Z-32A
PTD No.: 93-113
S.19, T.11N, R.12E Meridian: Umiat
Elevation: 37' Mud Wt.: 9.6 ppg.
CASING DATA:
Drive Pipe: O~D." Set @: ft. Wrth
Conductor: 13 3\8 O.D." Set @: 2,668 ff. Surface: 9 5~8
Intermediate: O.D." Set@: ff. Prodctn:
Penetration
O.D." Set @: 8,886 ft.
O.D." Set @: ft.
PLUGGING DATA:
1. Open Hole Plugs:
2. Open Hole Isolation Plugs: Cmt. Plug was 74 bbl's Class G Cmt (365 sx's) @ 15.8 ppg
Plug was set from TD @ 10,830' to 9,924' and Verified with 17000 # drill .string weight.
3. Perforation Plugs:
4. Annulus Plugs:
5. Casing Stub Plugs:
6. Surface Plug:
Casing Removal:
N/A " Casing Cut @ N/A Feet
N/A " Casing Cut @ N/A Feet
N/A " Casing Cut @ N/A Feet
N/A " Casing Cut @ N/A Feet
REMARKS: A dry hole tree will be installed until decision is made whether to redrill or P&A well.
The well bore will be displaced with sea water and the last 2000' of hole with desiel.
Distribution:
orig - Well File
c - Operator
c - DNR/DOG
c- Database
¢ - Rpt File
c - Inspector
Inspector (s)' .. ~.~
Fl-000 (Rev. 3/93) 01GHH3AB.XLS
WALTER J. HICKEL, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
August 5, 1993
M. E. Miller
Drilling Engineer Supervisor
BP Exploration, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit Z-32A
BP Exploration, Inc.
Permit No. 93-113
Sur. Loc. 713'SNL, 1253'EWL, Sec. 19, TllN, R12E, UM
Btmnhole Loc. 3819'NSL, 4580'WEL, Sec. 18, TllN, R12E, UM
Dear Mr. Miller:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice'(approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector on the North Slope pager at
659-3607.
David W. Jo~
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] RedrillElllb. Type of well. Exploratory[] Stratigraphic Test[D Development OilE1
Re-Entry [] DeepenI-II Service [] Development Gas [] SingleZone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration KBE = 80.68' feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28262
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
713' SNL, 1253' EWL, SEC. 19, T11N, R12E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
3690' SNL, 4587' WEL, SEC. 18, T11N, R12E Z-32A (12-18-11-12) 2S100302630-277
At total depth 9. Approximate spud date Amount
3819' NSL, 4580' WEL, SEC. 18, T1 IN, R12E 8/8/93 $200,000.00
12. Distance to nearest 13. Distance to nearest well ~4. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 28245'-479' feet No close approach feet 2560 10830' MD/9177' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 89oo feet Maximum hole ancjle48.37 o Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 pslg
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 29# 13CR80 NSCC 1039' 9791' 8274' 10830' 9177' 352 sx Class "G"
8-1/2" 7" 29t/ NT-80 NSCC 1041' 8750' 7418' 9791' 8274'
19. To be completed for Redrill, Re-entry, and Deepen Operations. d ~..J ~.- ~ _.~.\ss.~¢~,
Present well condition summary ~.Ia~ka 0i~ .& Gas Oo~s. L;o~ .
Total depth: measured 11330 feet Plugs (measured) Ba/~'~'r"/'~'@ 11q~6~l~CPosisetplug@
true vertical BKB9186 feet 11006'w/12'cmf(~n top;cernentret-11120'
Effective depth: measured 11120 feet Junk (measured)
true vertical BKB9038 feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 110' 20" 147' 147'
S u r f ac e 2631' 13-3/8" 3850 cuft PF 2668' 2668'
Intermediate 10355' 9-5/8" 2244 cuft "G" 10392' 8541'
Production
Lin e r 1208' 7" 354 cuft "G" 10122; 11330' 8362 ;9186'
Perforation depth: measured 10945;11000', 11010;11070'
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l~
Drilling fluid program [] Time vs depth plot [] Refraction analysis• Seabed report[] 20 AAC 25.050 requirements[]
21. I here'S,y, certify that the foregoing is true and correct to the best of my knowledge /
Signe,~"--,3'~_ z ~---~ Title Drilling En~ineerSupervisor Date'~?!~~
Commission Use Only
Permit Number IAPI number IApproval date ISee cover letter
.,~3 -.,/./'..,~ 15 0- o z 5' - 2., / ¢.z. ? - o / I .r~'~--~---~-,~ Ifor other requirements
Conditions of approval Samples required [] Yes []No Mud Icg required []Yes J3INo
Hydrogen sulfide measures [] Yes I~ No Directional survey requ~reo ~ Yes [] No
Required working pressure for BOPE []2M.; 1-13M; ,I~SM' I-I10M; I-I15M;
Other: - -, ¢'~ned~¥ '
~rigto. 8.; o,~ by order of
Approved by ~t,,-'id W. 3ohnStOf~ Commissioner ,ne commission Date4:~-~"-',~!
Form 10-401 Rev. 12-1-85 Submit in triplicate
I Well Name: I Z-32A
Redrill Plan Summary
I Type of Redrill (producer or injector): I PRODUCER
ISurface Location:
Target Location:
I Bottom Hole Location:
4566 FSL 3700 FEL S19 TI 1N R12E UM
3690 FSL 4587 FEL S18 Tl lN R12E UM
3819 FSL 4580 FEL S18 TI 1N R12E UM
I AFENumber: 14P8007 I
I Estimated Start Date: I 08AUG93
IMD: 11°,83° I
I Rig: ] DOYON RIG #14
I Operating days to complete: I 12
ITVD: 19,177 I IKBE:
I Well Design (conventional, slimhole, etc.):
1 80.68'
I CONVENTIONAL
I Obiective: I SADLEROCHIT
Mud Program:
A 9.5 - 10.00 ppg Biozan polymer/KC1 water based mud will be used.
I Special design
considerations I NONE
Depth Density PV YP INT 10MIN FL OIL SOLIDS
(TVD) (PPG) (CP) (#/FT) GEL GEL cc/30min (%) (%)
KOP' 9.5 10 15 5 10 10 0 5
to to to to to to to to to
TD' 10.0 18 30 15 30 5 0 8
Directional'.
I KOP: I 8,900' MD/7,522' TVD
I Maximum Hole Angle: [ 48.37°
Close Approach Well- NONE
The above listed wells will be secured during the close approach.
Z-32A Sidetrack Plan Summary
Casing/Tubin: Program:
Wt/Ft
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tb§ O.D. MD/TVD MD/TVD
8-1/2" 7" 29#/FT 13CR-80 NSCC 1,039' 9,79178,274' 10,83079,177'
8-1/2" 7" 29#/FT NT-80 NSCC 1,041' 8,75077,418' 9,79178,274'
Cement Calculations:
I LinerSize: ] 7" ]
Basis:1 50~o open hole ex~ess, 40' shoe joint, 150' liner lap and 150' excess above line[' with DP.
Total Cement Volume: 352 sxs of Class G Blend @ 1.18 ft3/sx
] LinerSize: ] ]
Basis:] 50~o open hole ex~ess, 40' shoe joint, 150' liner lap and 150' excess above liner with DP.
Total Cement Volume: sxs of Class G Blend @ 1.18 ft3/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind shear rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Z-32A Sidetrack Plan Summary Page 2
PRUDHOE BAY
DRILLING
~d~n,li~cat½on 140 BKB SECTN INCLN
TIE-IN 8go0 7522 ~502 45,6~
END OF £URVE g~76 7740 366@ 2g.67
IARGET 10570 895~ 4359 2g.67
lO i0830 9177 4488 29.67
Z-32A (P3)
VERTTCAL SECTION VTEN
Section at: 2.55
TVD Scale.' ~ inch : 1200 feet
Dep Sca]e.' I inch = 1200 feet
~ ....... i ' : Iorawn ..... : 06/23/93
1
. ..'. ..............
:
I
;
'~~X - ~ ' - ~ .................
....... ~ ......... ~ ~. lq' ]o, bO~llj llSglb~:
~~ ~3~ ~-'l'"L .......
~ ,
~ i
-, ..... ~_._-~ ..... . . __ ~__ - .........
, ....
,
~ooo
9600
0 600 t200 '~800 2400 3000 3600 4200 4800 5.400 6000
Section Oeoarture
6600 7200 7800
Z-32A .... UNDRY APPROVAL APPLIC/' ...... ON
Ob!ective:
The primary objective of the Z-32A sidetrack is to eliminate a water channeling problem,
original well has experienced high water cut since being put on production due to a poor
primary cement job.
The
The scope of the Z-32A redrill is as follows: Plug and abandon the original perforations and ·
pull the existing 4-1/2", 13CR-80 tubing completion . Mill a 50' section in the 9-5/8"
casing starting at +8,900' MD. Lay a cement plug across the section, kickoff and drill a new 8-
1/2" hole to a target about 427' to the south of the original wellbore. Obtain E-line
(DII_/BHCS/SP/GR/CNL) logs. Run and cement a 7" 29# 13CR x L-80 liner. Clean out to the
landing collar. Recomplete with the original 4-1/2" 13 Cr tubing and prepare well for post-
rig perforation.
Timinq:
This project is presently scheduled for Doyon Rig #14 on or about 08AUG93.
should take approximately 12 days.
The redrill
RECEIVED
d U L 0 1995
Alasl{a 0il & Gas Cons.
Anchorage
Z-32/~,UNDRY APPROVAL APpLIC:
PLUG-BACK SUMMARY PROCEDURE
To prepare for the Z-32A redrill, the following actions will need to be taken prior to the rig
move:
1. Notify an AOGCC representative prior to commencing plug-back operations.
2. Run in with coil tubing while circulating seawater. Lay a cement plug starting from ·
PBTD. Squeeze down and leave the top of cement at least 100' above the top perforation'
but below the packer,
NOTE: According to records PBTD is cement at 10,994' md. Top perf at
10,944' md and 9-5/8" x 4-1/2" TIW MODEL HBBP packer at
10,047' md. WLEG at 10,147' md.
3. With AOGCC representative on location to witness operation, run in With slickline and
confirm that top of cement is at least 100' above the top perforation.
4. WLIH in and cut the tubing in the first full joint above the packer based upon the original
completion tubing tally.
NOTE: Middle of first full joint estimated at _+9,982' md.
5. Circulate well over to seawater. If the rig is going to move in within a couple of days do
not freeze protect. Otherwise freeze protect well with diesel to 2000'.
6. Bleed any pressure from the tubing, inner annulus and outer annulus to zero.
7. Install a back-pressure valve. Remove the well house and flowlines. Level the pad and
dig out the cellar. Prepare the pad for arrival of the rig.
RECEIVED
d U L 3 0 1993
Alas~a .Oil .& Gas Cons. L;umrnlssioP
Anchorage
WELLHEAD: McEVOY ,=, BF ELEV: 54.95'
ACTUATOR: OTIS
SSSV LANDING NIPPLE
~) (OTIS"HXO") (3.813" I.O.) 2003'
13 3/8", 68#m, ~ 2668' ~
L-80, BTRS ~.~
GAs LIFT MANDRELS
I ( OTIS w/RA LATCHES}
No. MD-BKB TVDss~
4 1/2", 12.6#/ft, Nt 13 CR 80
TDS, Non-IPC TUBING 6 3104' 3012'
TUBING I.D. = 3.958" 5 5979' 5268'
CAPACITY = 0.01522 BBI_/FT 4 7850' 6657'
3 ~ 8882' 7427'
NOTE: CHROME TUBING 2 9449' 7833'
1 10,012' 8198'
I I' 4 1/2" 'sws" Nipple ,I 1____0,o41'
(PARKER) (3.813" ID)
~- TIW ANCHOR LATCH
(HBBP) (4.000" ID) I 1 0~047;
4 1/2', 12.6#fit, L-80, TDS, Tailplpe
TOP OFT" 110,122'1~ ~ ! I ~ 4 1/2' 'SWS' NIPPLE
I
(PARKER) (3.813" I.D.) .10,096'
LINER I I 4 1/2" "SWN' NIPPLE
(PARKER) (3.725"I.D.), 10,107'
NT-80s.DS/8"47#~'NSCC ~ ~~ ' "--~ 41/2'WLE~ ]10,147'
PERFORATION SUMMAI:J~'
REF LOG: ATLAS-BHCA 4-12-89
ISIZE SPF INTERVAL STATUS ~ MARKER JOINT 110,781'
21/8" 4 10,944-11,000' sc~z (5-1-91)
21/8" 4 11,010-11,070' soz (5-1-91)
!2 1/8' 4 11,080- 11,105' SQZ (5-1-91)
4 1/2" 12 11,100 - 11,110' SQZ (5-1-91) :~::?:~*~=??i~/'-~--.--Set SWS PoslSet Plug @ 11,006'
4 1/2" 12 11,130- 11,135' SQZ (5-1-91) [~ & Dump 12' of Cement on top.
33/8" 4 10,945-11,000 [5-19-91~ 4-14-92
33/R" 4 11.010- 11.070!5 19-91
FISH: I~ER IBP LEFT AT PBTD Of
PBTD 11,120'
CEMENT
RETAINER
'-'-'-'~*-'- AlasKa 0il & Gas Cons. Commission
Anchorage
7", 26#/'rt, L-80 IJ4S
DATE BY REVISION PRUDHOE BAY UNIT
3-30-89 ..INITIAL COMPLETION WELL: Z-32 (11-18-11-12)
5-6-91 MJL R.W.O. APl NO. 50-029- 21924
5-20-91 R. Toole Initial Post RWO Perforations SEC. 19 j, T-11 Nj, R-12E
3-17-92 !R. Toole Baker IBP set, Element @ 11,007' '_ ;L "
4-14-92 R. Toole SWSPosiSelPlug, Element@ 11,006' BP Explorabon (Alaska),
Inc.
GAS LIFT MANDRELS
( OTIS w/RA LATCHES)
No. MD-BKB TVDss
6 3104' 3012'
5 5979' 5268'
4 7850' 6657'
3 8882' 7427'
2 9449' 7833'
1 10,012' 8198'
2UL
~DG:,~AM BF:> E.~xpLORATION
BP IXPLORATiON
Rom W~mm'/Mon~ Townsend
PaD Rig
;rom: J.E. R~'~m
BPX-BOC
Doyon Rig #14
BPX - ~B1Z-1
ARCO Alalkl, Inc.
Date: Thurmday, Ju1¥~9,/199~l
P.1
Subject: Z.32A prm.Rt_~ Work I, AFIEg
The =-~2A Iidetr.= is currently ~cneduted for Doyen Rio gl 4. ~e ~t title.ts
1~ ~il ~ O~G99. C~ the ~e B~ DMttlDO Ro~ntatl~ on O~ RIO ~14
564-S510,
To preplre For the lidetJ'nck. We fotlowino l~JCr4 witi need to bi Oaken ~ior to ti~ rig move:
1, N~f¥ In AOGCC re~resent~tFw prior to commencing plug-i3ack opemtiorm.
Run in wl~ coil tubinO while circulating seawater. Lay a cemem plug Kerdn; fr~m PB'KD, Squeeze down
~d leave th~ tc~o of c~rnent ;~ le~t 1 OD' a;ov. ~he ~Ol; I~rfo~tion ~ l~tc~ ~he I~cker,
According to recto'ds P~TD i~ cement a; 10,994' mci. TOp perf at 10, 9,HI' mci and 9-5/~" x
4-1/Z" T1W MODEL H~BP pacer et 10,047' mU, WLEG at 1 O, 147' md.
3. Wl%h AOGCC reprelentafive on locale,on to witneaa operation, run in with slicldir~ and confirm thlK top of
cemem ie .t le~et 100' above the top perforation,
4. WUH In I~d cut '~he tubing in the first full joint above the packer based upnn the original completion ~ubing
t~lly.
NOTE: Middle of flrlt full j=nt estimateO at ~9,982' md.
$, Circulate well over to le~witlr. If the rig il going to move in within a couple of dayl do not fr~l~ protect,
Otherwlle freeze pro,eot w~l ~th die.~ to 20OD',
7, Install a baek-pre~ure valve. Remove the well house lnO flowlines. Level the pad eno dig out the cellar.
Prepare the pad for Irrivai of the dg,
In ldditJo~ to the current well steus reports normally provided to the I~g ~l:)ervisor, ~ale lubmtt m c~tdete
colt brl. kdovm for mil char{lei to this AFE for pre-dO work. Thlm should Include mil me~ce company charges,
mllooltlOnl, direct lad indir.tc~ pxpen8fl. Thanks for your blip.
Drilling Engineer fling Engr, 5upv.
J, A, Willoughby- MB 12/1
C, R, Welsh MB
Z-3ZA Well File
R. B, Frezler MB 9
K. Humphrey MB 9-2
STATE OF ALASKA
ALAS 'OILANDGAS CONSERVATION COMMISSK'
APPLiCA'IION FOR SUNDRY APPHOVALS
1. Type of Request:
Abandon x Suspend Operation Shutdown Re-enter suspended well
Alter casing __ Repair well Plugging x Time extension . . Stimulate
Change approved program ~ Pull tubing. ,. " Vadance P~)rf~rate Other x
Plugback for redrlll
2. Name of Operator
BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
713' SNL, 1253' EWL, SEC. 19, T11N, R12E, UPM
At top of productive interval
5. Type of Well:
Development X
Exploratory ~
Stratigraphic
Service.,
RECEIVED
6. Datum elevation (DF or KB)
KBE ,, 91.85 AMSL
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Z-32 (11-18-11-12)
1164'SNL, 390'EWL, SEC. 18, T11N, R12E, UPM
At effective depth
843' SNL, 452' EWL, SEC. 18, T11N, R12E, UPM
At total depth
696' SNL, 479' EWL, SEC. 18, T11N, R12E, UPM
J U L 3 0 199,
.0il & Gas Cons. C0mmis~
'' ~.ch_0_ragei
9. Permit number
89-26
10. APl number
j01t 50- 029-21924
11. Field/Pool
Prudhoe Bay Field/Oil Pool
feet
12. Present well condition summary.
Total depth: measured
true vertical
Effective depth: measured
true vertical
11330 feet
BKB 9156 feet
11120 feet
BKB 9038 feet
Plugs (measured) Baker IBP @ 11007'
SWS Posiset plug @ 11006' w/12' cmt on top.
cement retainer @ 11120'
Junk (measured)
CasingStructural Length-Size/Cemented. ~sur~
Conductor 1101 2~, / 147°/~
Surface 2631 ' 13-3/8" 3850 ce ft Permafrost ,~. ./ 2668,7 \
/
Production -
Liner 1208' / 7" 354 cu ft Clas~/~G" ~ 2'-1
true vertical
Tubing (size, grade, and measured depth) 4-1/2","~13CR-80, TDS tubing to 10147'MD
True vertical depth
147'
2668'
8541'
8362'-9186'
Packers and SSSV (type and measured depth) 9-5/8" TIW 'HB-BP' Packer @ 10047'MD, 4-1/'2" Otis 'HXO' @ 2003'MD
13. Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch
14. Estimated date for commencing operation
8/2/93
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended __
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed'~/~ ~ ~. Title Drilling EngineerSupe~isor
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test~ Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10-
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Orlglnat Signed By
David W. ,Johnston
Commissioner Date
SUBMIT IN TRIPLIOATE
· 0
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
RECEIVED
S£P 0 7' ~993
PRUDHOE BAY/Uaska Oil & Gas Cons. Commission
Anchorage
Run 1'
28 - August - 1993
ACIDLL/GR
CNIGR
3876
0818
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
lST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
RUN1
6027.00
JOHN DAHL
HAYWOOD/HEIM
REMARKS:
Z - 32A
500292192401
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
31-AUG-93
OPEN HOLE
RUN2 RUN3
19
liN
12E
713
3699
91.09
90.09
53.85
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 8886.0
8.500 10832.0
AC/DLL/GR & CH/GR.
CIRCULATION STOPPED: 15: 30 27-AUG-93.
AC/DLL/GR TOOL DRAGGING THROUGH SHALES ON THE REPEAT
PASS.
BOREHOLE WAS RE-CIRCULATED BEFORE THE CN/GR WAS RUN.
CIRCULATION STOPPED: 15:30 28-AUG-93.
CNC IS BOREHOLE CORRECTED, 8.5", RECORDED ON SANDSTONE
MATRIX, WITH CHISM FILTERING ACTIVE.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings;
hole data.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
BCS
DLL
GR
2435
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA
depth shifted and clipped curves;
0.5000
START DEPTH STOP DEPTH
8876.0 10798.0
10053.0 10818.0
8876.0 10787.0
10052.0 10795.0
10052.0 10802.0
GR from AC/DLL/GR run.
(MEASURED DEPTH)
BASELINE DEPTH
8876.0
8888.5
9013.0
9026.5
9179.0
9219.0
9280.0
9342.5
9349.0
9484.0
9503.5
9682.5
9708.0
9713.5
9743.0
9926.0
10068.0
10068.5
10085.5
10091.0
10101.5
10104.5
10118.0
10120.5
10121.0
10125.5
10129.0
10140.5
10151.5
10152.0
10153.5
10160.0
10164.5
10167.5
10174.5
10175.0
10184.5
10185.0
10190.0
EQUIVALENT UNSHIFTED DEPTH
GRCN LL3 DT
8876.0 8876.0 8876.0
8889.0
9013.0
9026.5
9179.0
9218.5
9279.5
9342.0
9348.5
9484.0
9503.5
9682.0
9707.5
9712.5
9742.5
9925.0
10084.5
all runs merged;
10100.5
10103.0
10117.5
10068.0
NPHI
8876.0
10067.5
10090.0 10090.5 10089.5
10121.0
10120.5
10129.0 10129.0
10140.0 10140.0
10150.5 10151.5
10174.5
10185.0
10167.5
10174.5
10185.0
10190.0
10125.0
10150.5
10153.0
10159.5
10163.0
10167.0
10174.0
10185.0
no case
10192.0
10196.0
10211.5
10212.0
10214.0
10217.5
10218.0
10222.0
10230.5
10232.0
10248.0
10248.5
10255.5
10256.0
10259.5
10272.5
10275.0
10276.0
10279.0
10283.0
10285.5
10290.5
10310.5
10315.5
10344.5
10348.0
10348.5
10353.0
10354.0
10354.5
10360.5
10377.5
10388.5
10389.0
10392.5
10393.5
10416.0
10437.5
10438.0
10440.0
10442.5
10458.0
10458.5
10461.5
10462.0
10469.5
10491.5
10494.0
10503.5
10504.5
10506.5
10507.0
10512.0
10512.5
10517.0
10569.5
10573.0
10612.0
10614.0
10629.0
10210.5
10211.5
10217.0
10218.0
10230.5
10250.0
10250.5
10259.5
10283.0
10286.0
10310.5
10348.0
10352.5
10353.5
10354.5
10360.5
10378.0
10388.5
10392.5
10393.0
10469.0
10491.5
10494.0
10503.0
10504.0
10506.5
10507.0
10516.5
10569.5
10573.0
10613.5
10629.0
10221.0
10231.5
10255.5
10315.0
10348.5
10389.0
10437.5
10441.0
10443.5
10457.0
10461.5
10196.0
10212.0
10256.0
10272.5
10276.0
10291.0
10344.0
10389.0
10416.5
10513.0
10191.5
10213.5
10221.0
10231.5
10256.0
10275.0
10279.0
10315.5
10348.0
10355.0
10437.0
10457.5
10461.0
10512.0
10612.0
10637.0
10640.5
10643.5
10648.5
10649.5
10650.5
10656.0
10657.5
10658.5
10663.5
10665.0
10671.5
10679.0
10680.0
10719.5
10720.0
10722.5
10724.5
10725.0
10727.5
10728.5
10735.0
10739.5
10782.0
10782.5
10788.5
10789.0
10792.0
10845.0
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
BCS
DLL
GR
2435
$
REMARKS:
10637.0
10640.0
10648.0
10648.5
10649.5
10656.0
10657.5
10658.0
10664.5
10671.0
10679.0
10679.5
10718.5
10727.0
10727.5
10734.0
10739.5
10788.0
10788.5
10845.0
10721.0
10725.0
10739.5
10640.5
10664.0
10722.5
10783.0
10640.5
10643.0
10663.5
10670.5
10718.5
10724.0
10734.0
10739.5
10781.0
10791.0
10845.0 10845.0 10845.0
RUN NO. PASS NO. MERGE TOP MERGE BASE
1 2 8876.0 10798.0
1 2 10053.0 10818.0
1 2 8876.0 10787.0
1 2 10052.0 10795.0
1 2 10052.0 10802.0
OPEN HOLE PORTION OF MAIN PASS.
LLD, SP, MTEM, TENS, & TEND (from AC/DLL run) WERE
SHIFTED WITH LL3.
FUCT, NUCT, TENS, & TEND (from CN run) WERE SHIFTED
WITH NPHI.
THE CURVE "GRCN" REFERS TO THE GAMMA RAY RECORDED
WITH CN TOOL.
$
CN : BP EXPLORATION
WN : Z - 32A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
(ALASKA)
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
Name Tool Code Samples Units
1 GR BCS 68 1 GAPI
2 DT BCS 68 1 US/F
3 TEND BCS 68 1 LB
4 TENS BCS 68 1 LB
5 LL3 DLL 68 1 OHMM
6 LLD DLL 68 1 OHMM
7 SP DLL 68 1 MV
8 MTEM DLL 68 1 DEGF
9 GR 2435 68 1 GAPI
10 NPHI 2435 68 1 PU-S
11 FUCT 2435 68 1 CPS
12 NUCT 2435 68 1 CPS
13 TEND 2435 68 1 LB
14 TENS 2435 68 1 LB
API API API API
'Log Crv Crv
Size Length Typ Typ Cls Mod
4 20 789 90 0
4 84 653 71 5
4 20 789 90 0
4 20 789 90 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 30 739 95 0
4 98 211 23 1
4 98 211 23 1
4 98 211 23 1
4 98 211 23 1
4 98 211 23 1
4 98 211 23 1
56
* DATA RECORD (TYPE# 0)
Total Data Records: 247
966 BYTES *
Tape File Start Depth = 10845.000000
Tape File End Depth = 8876.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 59086 datums
Tape Subfile: 2 468 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 8850.5 8876.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
- EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
$
REMARKS:
CN
WN
FN
COUN
STAT
CASED HOLE PORTION OF AC/DLL/GR MAIN PASS.
$
: BP EXPLORATION (ALASKA)
: Z - 32A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
3 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH GR 68 1 GAPI 4
2 TEND GR 68 1 LB 4
3 TENS GR 68 1 LB 4
4 21 990 60 6
4 10 579 41 1
4 10 579 41 1
12
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 8876.000000
Tape File End Depth = 8845.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 3
Minimum record length:
Maximum record length:
253 datums
26 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE
GR
AC
DLL
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
START DEPTH STOP DEPTH
8850.5 10822.0
10053.0 10842.0
8873.0 10810.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
PCM
MIS
DLL
GR
MIS
AC
$
CABLEHEAD TENSION
TEMPERATURE
PULSE CODE MODULATOR
MASS ISOLATION SUB
DUAL LATEROLOG
GAMMA RAY
MASS ISOLATION SUB
BHC ACOUSTILOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
28-AUG-93
FSYS REV. J001 VER. 1.1
1530 27-AUG-93
121 28-AUG-93
10832.0
10826.0
8876.0
10818.0
1800.0
TOOL NUMBER
3974XA
2806XA
3506XA
3967XA
1229EA/1229MA
1309XA
3967XA
1609EB/1603MA
8.500
8886.0
8876.0
BIOZAN
10.00
59.0
8.4
5.8
198.0
0.090
0.035
72.0
198.0
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
AC/DLL/GR MAIN PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 32A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.119 68.0
0.000 0.0
0.104 68.0
0.000 0.0
0.00
0.000
2.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI
2 AC AC 68 1 US/F
3 ACQ AC 68 1
4 CHT AC 68 1 LB
5 TTEN AC 68 1 LB
6 SPD AC 68 1 F/MN
7 RS DLL 68 1 OHMM
8 RD DLL 68 1 OHMM
9 SP DLL 68 1 MV
10 TEMP DLL 68 1 DEGF
4 4 06 969 49 6
4 4 48 852 89 1
4 4 81 285 47 0
4 4 95 558 30 1
4 4 95 558 30 1
4 4 61 094 30 1
4 4 40 514 81 0
4 4 39 859 45 0
4 4 23 415 80 5
4 4 84 503 82 1
40
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 348
Tape File Start Depth = 10845.000000
Tape File End Depth = 8845.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 147098 datums
Tape Subfile: 4 425 records...
Minimum record length: 62 bytes
Maximum record length: 1018 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10052.0
2435 10052.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10808.0
10815.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
GR
CN
PCM
FTS
FTS
SINK
$
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
FEED THROUGH SUB
FEED THROUGH SUB
SINKER BAR
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
28-AUG-93
FSYS REV. J001 VER. 1.1
1530 28-AUG-93
2143 28-AUG-93
10832.0
10825.0
10050.0
10802.0
1800.0
TOOL NUMBER
3974XA
2806XA
1309XA
2435XA
3506XA
8.500
8886.0
0.0
BIOZAN
10.30
59.0
8.4
5.8
189.0
0.108
0.042
0.135
70.0
189.0
70.0
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS ·
·
CN/GR MAIN PASS.
CHISM FILTERING IS ACTIVE.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 32A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.000
0.191
0.000
THERMAL
SANDSTONE
0.00
8.500
0.0
0.0
70.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
1 GR 2435 68 1 GAPI
2 CNC 2435 68 1 PU-S
3 CNCF 2435 68 1 PU-S
4 CN 2435 68 1 PU-L
5 LSN 2435 68 1 CPS
6 SSN 2435 68 1 CPS
7 CHT 2435 68 1 LB
8 TTEN 2435 68 1 LB
9 TEN 2435 68 1 LB
10 SPD 2435 68 1 F/MN
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 08 501 10 0
4 4 98 211 23 1
4 4 98 211 23 1
4 4 52 326 75 5
4 4 84 023 70 1
4 4 83 368 34 1
4 4 19 912 29 5
4 4 19 912 29 5
4 4 19 912 29 5
4 4 54 376 29 5
40
* DATA RECORD (TYPE# 0)
Total Data Records: 159
1018 BYTES *
Tape File Start Depth = 10822.000000
Tape File End Depth = 9910.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 40393 datums
Tape Subfile: 5 236 records...
Minimum record length: 62 bytes
Maximum record length: 1018 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10044.0
AC 10052.0
DLL 10044.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
10820.5
10841.0
10810.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
PCM
MIS
DLL
GR
MIS
AC
$
CABLEHEAD TENSION
TEMPERATURE
PULSE CODE MODULATOR
MASS ISOLATION SUB
DUAL LATEROLOG
GAMMA RA¥
MASS ISOLATION SUB
BHC ACOUSTILOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
28-AUG-93
FSYS REV. J001 VER. 1.1
1530 27-AUG-93
47 28-AUG-93
10832.0
10826.0
8876.0
10818.0
1800.0
TOOL NUMBER
3974XA
2806XA
3506XA
3967XA
1229EA/1229MA
1309XA
3967XA
1609EB/1603MA
8.500
8886.0
8876.0
BIOZAN
10.00
59.0
8.4
5.8
198.0
0.090
0.035
0.119
0.000
72.0
198.0
68.0
0.0
MUD CAKE AT MT:
MUD CAKE AT BHT:
0.104
0.000
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
0.00
0.000
TOOL STANDOFF (IN) :
2.0
REMARKS:
AC/DLL/GR REPEAT PASS.
TOOL WAS DRAGGING THROUGH SHALES ON THIS PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 32A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
68.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI 4
2 AC AC 68 1 US/F 4
3 ACQ AC 68 1 4
4 CHT AC 68 1 LB 4
5 TTEN AC 68 1 LB 4
6 SPD AC 68 1 F/MN 4
7 RS DLL 68 1 OHMM 4
8 RD DLL 68 1 OHMM 4
9 SP DLL 68 1 MV 4
10 TEMP DLL 68 1 DEGF 4
4 06 969 49 6
4 48 852 89 1
4 81 285 47 0
4 95 558 30 1
4 95 558 30 1
4 61 094 30 1
4 40 514 81 0
4 39 859 45 0
4 23 415 80 5
4 84 503 82 1
40
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 140
Tape File Start Depth = 10844.000000
Tape File End Depth = 10044.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 182310 datums
Tape Subfile: 6 216 records...
Minimum record length: 62 bytes
Maximum record length: 1018 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 2
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE
GR
2435
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
START DEPTH
10040.0
10040.0
STOP DEPTH
10816.0
10824.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CHT
TEMP
GR
CN
PCM
FTS
FTS
SINK
$
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
FEED THROUGH SUB
FEED THROUGH SUB
SINKER BAR
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
28-AUG-93
FSYS REV. JO01 VER. 1.1
1530 28-AUG-93
2109 28-AUG-93
10832.0
10825.0
10050.0
10802.0
1800.0
TOOL NUMBER
3974XA
2806XA
1309XA
2435XA
3506XA
8.500
8886.0
0.0
BIOZAN
10.30
59.0
8.4
5.8
189.0
0.108
0.042
0.135
0.000
0.191
70.0
189.0
70.0
0.0
70.0
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
CN/GR REPEAT PASS.
CHISM FILTERING IS ACTIVE.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Z - 32A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
0.000
THERMAL
SANDSTONE
0.00
8.500
0.0
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2435 68 1 GAPI 4
2 CNC 2435 68 1 PU-S 4
3 CNCF 2435 68 1 PU-S 4
4 CN 2435 68 1 PU-L 4
5 LSN 2435 68 1 CPS 4
6 SSN 2435 68 1 CPS 4
7 CHT 2435 68 1 LB 4
8 TTEN 2435 68 1 LB 4
9 TEN 2435 68 1 LB 4
10 SPD 2435 68 1 F/MN 4
4 08 501 10 0
4 98 211 23 1
4 98 211 23 1
4 52 326 75 5
4 84 023 70 1
4 83 368 34 1
4 19 912 29 5
4 19 912 29 5
4 19 912 29 5
4 54 376 29 5
40
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 138
Tape File Start Depth = 10831.000000
Tape File End Depth = 10039.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 75253 datums
Tape Subfile: 7
Minimum record length:
Maximum record length:
213 records...
62 bytes
1018 bytes