Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-188MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Friday, January 10, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Guy Cook
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp Alaska, LLC
F-30A
MILNE PT UNIT F-30A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 01/10/2025
F-30A
50-029-22623-01-00
213-188-0
W
SPT
7059
2131880 1765
2759 2755 2754 2754
676 708 708 708
REQVAR P
Guy Cook
11/12/2024
MITIA per AIO 10B.017. Testing was completed with a Little Red Services pump truck and calibrated gauges.
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:MILNE PT UNIT F-30A
Inspection Date:
Tubing
OA
Packer Depth
455 3471 3448 3444IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitGDC241111175542
BBL Pumped:5.3 BBL Returned:5.3
Friday, January 10, 2025 Page 1 of 1
999
9 9
9 9
9
99
9
9 9
9
9
9
MITIA per AIO 10B.017
James B. Regg Digitally signed by James B. Regg
Date: 2025.01.10 16:16:39 -09'00'
Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 5/1/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20240501
Well API #PTD #Log Date Log Company Log Type AOGCC Eset#
HV B-13 50231200320000 207151 4/10/2024 YELLOW JACKET GPT-PERF
KU 13-06A 50133207160000 223112 3/27/2024 YELLOW JACKET GPT-PERF
KU 13-06A 50133207160000 223112 4/1/2024 YELLOW JACKET GPT-PLUG-PERF
KU 13-06A 50133207160000 223112 3/22/2024 YELLOW JACKET GPT-PERF
KU 33-08 50133207180000 224008 4/30/2024 YELLOW JACKET SCBL
KU 41-08 50133207170000 224005 4/23/2024 YELLOW JACKET SCBL
KU 41-08 50133207170000 224005 4/11/2024 AK E-LINE GPT/Perf/CIBP
MPU F-30A 50029226230100 213188 4/12/2024 READ CaliperSurvey
MPU S-13 50029230930000 202114 4/16/2024 READ Caliper Survey
NCI A-17 50883201880000 223031 3/22/2024 AK E-LINE Perf
Paxton 6 50133207070000 222054 4/14/2024 AK E-LINE GPT/Perf
PBU PTM P1-13 50029223720000 193074 4/8/2024 YELLOW JACKET CBL
SRU 232-15 50133207140000 223091 3/28/2024 YELLOW JACKET GPT-PLUG-PERF
SRU 232-15 50133207140000 223091 4/22/2024 YELLOW JACKET PLUG-PERF
SRU 241-33B 50133206960000 221053 4/12/2024 YELLOW JACKET GPT-PERF
SRU 241-33B 50133206960000 221053 4/4/2024 YELLOW JACKET GPT-PERF
Please include current contact information if different from above.
T38745
T38746
T38746
T38746
T38747
T38748
T38748
T38749
T38750
T38751
T38752
T38753
T38754
T38754
T38755
T38755
MPU F-30A 50029226230100 213188 4/12/2024 READ CaliperSurvey
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2024.05.13 09:32:35 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, December 22, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Bob Noble
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp Alaska, LLC
F-30A
MILNE PT UNIT F-30A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 12/22/2022
F-30A
50-029-22623-01-00
213-188-0
W
SPT
7059
2131880 1765
1594 1583 1583 1600
534 549 549 549
REQVAR P
Bob Noble
11/5/2022
MIT-IA every two years per AIO 10B.017.
30 MinPretest Initial 15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:
MILNE PT UNIT F-30A
Inspection Date:
Tubing
OA
Packer Depth
245 2424 2394 2386IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitRCN221110155659
BBL Pumped:4 BBL Returned:4
Thursday, December 22, 2022 Page 1 of 1
From:Wallace, Chris D (CED)
To:AOGCC Records (CED sponsored)
Subject:FW: MPF-30A (PTD#213188) AA request
Date:Thursday, November 18, 2021 10:56:55 AM
From: Wallace, Chris D (CED) <chris.wallace@alaska.gov>
Sent: Wednesday, November 17, 2021 10:10 PM
To: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Subject: Re: MPF-30A (PTD#213188) AA request
Oliver,
Continued injection operations is approved while the applicatiin is processed.
Regards,
Chris
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Wednesday, November 17, 2021 5:05:06 PM
To: Wallace, Chris D (CED) <chris.wallace@alaska.gov>
Subject: MPF-30A (PTD#213188) AA request
Chris,
Do we have permission to continue injection into MPF-30A while the AA request for continued
operation with slow TxIA is being processed by the AOGCC?
Thanks,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Engineer
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
From:Wallace, Chris D (CED)
To:AOGCC Records (CED sponsored)
Subject:FW: Milne Point F-30A (PTD# 213188) IA repressurization
Date:Monday, October 25, 2021 9:14:58 AM
Attachments:image001.png
image002.png
image003.png
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Wednesday, October 20, 2021 3:56 PM
To: Wallace, Chris D (CED) <chris.wallace@alaska.gov>
Cc: David Haakinson <dhaakinson@hilcorp.com>; Regg, James B (CED) <jim.regg@alaska.gov>
Subject: Milne Point F-30A (PTD# 213188) IA repressurization
Mr. Wallace,
WAG injector Milne Point F-30A (PTD# 213188) was found upon review of long- term annulus pressure trends to show signs of slow IA repressurization when on injection. The last
AOGCC witnessed MIT-IA was conducted on 11/15/2020 which passed to 1800 psi. We plan to leave the well on injection to aid in diagnostics. Annulus pressures will be maintained
under MOASP while diagnostics are performed, if the IA pressure cannot be managed with periodic bleeds the well will be shut-in.
Plan forward:
1. PPPOT-T, PPPOT-IC.
2. Bleed OAP, Monitor.
3. Request Administrative Approval for continued injection with slow IA repressurization as necessary.
Please contact me with any questions or concerns.
Regards,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Engineer
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error,
you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above,then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systemsor data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
MEMORANDUM
To: Jim Regg
P.I.Supervisor C� IZ(I iiG r
FROM: Lou Laubenstein
Petroleum Inspector
Well Name MILNE PT UNIT F -30A
Insp Num: mitLOL201116093617
Rel Insp Num:
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, November 23, 2020
SUBJECT: Mechanical Integrity Tests
Hilcorp Alaska, LLC
F -30A
MILNE PT UNIT F -30A
NON -CONFIDENTIAL
API Well Number 50-029-22623-01-00
Permit Number: 213-188-0
Packer Depth
Well F -30A (TypeInj w' TVD
PTD 2131880 !Type Testi SPT !Test psi
BBL Pumped: 3.2 IBBL Returned:
Interval 4vxTST P/F
Notes' Standard 4 year test
7059 ' Tubing
1765 IA
3.3 OA
P �-
Src: Inspector
Reviewed By:
P.I. Supry r
Comm
Inspector Name: Lou Laubenstein
Inspection Date: 11/15/2020 ,,
Pretest Initial 15 Min 30 Min 45 Min 60 Min
—14W7[— [— 1470 1468, 1466
178 2109 2084 2077
496 508 509 509
Monday, November 23, 2020 Page I of 1
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
1 DATE: Tuesday,November 22,2016
TO:
Jim Regg � 60.2-itto
P.I.Supervisor l'J SUBJECT: Mechanical Integrity Tests
tt HILCORP ALASKA LLC
F-30A
FROM: Bob Noble MILNE PT UNIT KR F-30A
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry ilie-
NON-CONFIDENTIAL Comm
Well Name MILNE PT UNIT KR F-30A API Well Number 50-029-22623-01-00 Inspector Name: Bob Noble
Permit Number: 213-188-0 Inspection Date: 11/13/2016
Insp Num: mitRCN161113165356
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well F-30A -!Type Inj W TVD 7059 Tubing
936 943 941 940 -
PTD 2131880 Type Test SPT Test psi 1765 ' IA 22 2020 - 1994 - 1988 -
Interval ICTAL P/F P ✓ OA 453 469 • 470 . 470 -
L —
Notes:
•
SC
A�� j11r4 (l ?.
11 •
Tuesday,November 22,2016 Page 1 of 1
(Vl R F-3O,A
713 c
Regg, James B (DOA)
From: Wyatt Rivard <wrivard@hilcorp.com>
Sent: Thursday, October 06, 2016 10:57 AM c!k,(o I lc,
To: Regg, James B (DOA)
Cc: Wallace, Chris D (DOA)
Subject: Milne Point injector MPF-30A (PTD # 2131880)
Attachments: MPF-30A TIO Plot.xlsx; MPU F-30A MIT WSR 11-26-13.pdf
Jim,
Milne Point injector MPF-30A (PTD #2131880) has been shut in waiting on a RWO of its offset producer since 5/7/16.
Reviewing the well file, the well had a CTD sidetrack completed on 4/28/14. I am unable to locate an MIT-IA conducted
post sidetrack.
My records have the most recent MIT-IA conducted on MPF-30 (PTD# 195184) on 11/26/13.The test was unwitnessed
and passed to 4154 psi. I checked with BPXA, and they confirmed this is the most recent MIT-IA in their records. The last
AOGCC witnessed MIT-IA on the MPF-30 well file shows a passing MIT-IA to 2120 psi on 9/29/2012.
The well is expected to remain shut in until sometime in November. Our plan forward is to obtain a shut-in MIT-IA to
confirm integrity now and then we will notify the AOGCC when returning the well to injection in November for
stabilization and witnessed MIT-IA testing. Additionally, I have gone through and verified that Hilcorp's other operable
North Slope sidetracked injectors have all had MIT-lAs post sidetrack.
Please let me know if you have any additional questions.
Thank You,
Wyatt Rivard Well Integrity Engineer
0: (907) 777-85471C: (509)670-8001 I wrivard@hilcorp.com SCANNED JUN 0 8 2017
3800 Centerpoint Drive,Suite 1400 1 Anchorage,AK 99503
Hilcorp Alaska
s •
awnloA
0 0 0 0 0 0
o 0 0 0 0 0 0
u-, o Ln o Ln o Lc
ii M N N , f-1 V1 0
910Z/90/01
9T0Z/ZO/OT
910Z/8Z/60
9TOZ/bZ/60
9T OZ/OZ/60
910Z/91/60
9TOZ/ZT/60
910Z/80/60
91OZ/170/60 °L'
9TOZ/T£/80
9TOZ/LZ/80 I
9TOZ/£Z/80
9TOZ/6T/80
9T0Z/ST/80
9TOZ/TT/80
910Z/LO/80
910Z/£0/80
91OZ/0£/LO
9T0Z/9Z/L0
0 9TOZ/ZZ/L0 I
CZ 9TOZ/8T/LO
O 9TOZ/bT/LO
H 9TOZ/OT/LO
Q 9TOZ/90/LO
0
m 9TOZ/ZO/LO
a 9TOZ/8Z/90
2 9T0Z/bZ/90
9T0Z/OZ/90 g
910Z/91/90 I
9TOZ/ZT/90
910Z/80/90
91OZ/b0/90
9T0Z/T£/S0
9TOZ/LZ/S0
9T0Z/£Z/S0
9T0Z/6T/S0
9T0Z/ST/S0 .(c129T0Z/TT/S0
• 9T0Z/LO/S0 I
j f 9T0Z/£0/SO
91OZ/6Z/b0
9T0Z/SZ/b0
9TOZ/TZ/b0
9T0Z/LT/b0
9T0Z/£T/b0
•--.--' 91OZ/60/170
8 e e e 8 e 8 0
n o 2 o Ln o Ln
m m N N .--i .--i
aanssaad
WSR - MPF-30 - 11/26/201lb
• Page 1 of 1
WELL SERVICE REPORT
WELL DATE JOB SCOPE DAY SUPV
MPF-30 11/26/2013 CTD SCOLES
AFE CODE DAILY WSR COSTS DAILY WORK NIGHT SUPV
$1,268 MIT-IA; PUMP WILLIAMS-NATHAN
MIN ID DEPTH TTL SIZE KEY PERSON UNIT
0" 0 FT 0" LRS-VONBARGEN LRS 64
DAILY SUMMARY
780/0/400 MIT-IA to 4200 psi PASS. Pumped 7.3 bbls diesel to reach test pressure, lost 46 psi in the first 15 mins and 11
psi in the second. Bled back+/-7 bbls. Final WHPs=770/0/410
LOG ENTRIES
[nit Tbg, IA, OA-> 780 0 400
TIME BPM BBLs FLUID TEMP TBG IA OA COMMENTS
20:00 Start ticket, Spot equiptment, PJSM, Rig onto IA, Barriers
updated
20:27 Start pressuret test
20:48 Pressure test pass 4800,trip set 4300, Check valve pass
20:58 .75 0 diesel 40 780 0 400 Online down IA
21:05 .5 4 " " 850 2500 440
21:12 0 7.3 " " 812 4211 460 Stop pumping, Start test
21:27 787 4165 466 First 15 lost 46 psi
21:42 786 4154 465 Second 15 lost 11 psi PASS, Start bleeding pressure
22:31 770 0 410 Shut in bleed, start rig down
23:59 End ticket leave locaiton
Final Tbg,IA,OA-> 770 0 410
FLUID SUMMARY
7 bbls diesel
MIT TEST
WELL TYPE PWI
TEST#1
REQUIRED TEST TEST TYPE FLUIDS USED TO TEST
PRESSURE MIT-IA DIESEL
4,200
START TIME: 21:12 PRE TEST INITIAL 15 MINUTE 30 MINUTE PASS OR
PRESSURES PRESSURES PRESSURES PRESSURES FAIL
TUBING 780 812 787 786
IA 0 4,200 4,165 4,154 PASS
OA 400 460 466 465
COMMENTS
Used 7.3 bbls diesel to reach test pressure, bled back+/-7 bbls
Safety Notes
NA
JOB COSTS
SERVICE COMPANY-SERVICE DAILY WSR COST CUMUL TOTAL
LITTLE RED $1,268 $1,268
TOTAL FIELD ESTIMATE: $1,268 $1,268
http://swis.hilcorp.com/WEApp/awg-action-report.aspx?wellActiv ityId=0B52894A711 A4... 10/6/2016