Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-188MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, January 10, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-30A MILNE PT UNIT F-30A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/10/2025 F-30A 50-029-22623-01-00 213-188-0 W SPT 7059 2131880 1765 2759 2755 2754 2754 676 708 708 708 REQVAR P Guy Cook 11/12/2024 MITIA per AIO 10B.017. Testing was completed with a Little Red Services pump truck and calibrated gauges. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT F-30A Inspection Date: Tubing OA Packer Depth 455 3471 3448 3444IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC241111175542 BBL Pumped:5.3 BBL Returned:5.3 Friday, January 10, 2025 Page 1 of 1 999 9 9 9 9 9 99 9 9 9 9 9 9 MITIA per AIO 10B.017 James B. Regg Digitally signed by James B. Regg Date: 2025.01.10 16:16:39 -09'00' Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 5/1/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240501 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# HV B-13 50231200320000 207151 4/10/2024 YELLOW JACKET GPT-PERF KU 13-06A 50133207160000 223112 3/27/2024 YELLOW JACKET GPT-PERF KU 13-06A 50133207160000 223112 4/1/2024 YELLOW JACKET GPT-PLUG-PERF KU 13-06A 50133207160000 223112 3/22/2024 YELLOW JACKET GPT-PERF KU 33-08 50133207180000 224008 4/30/2024 YELLOW JACKET SCBL KU 41-08 50133207170000 224005 4/23/2024 YELLOW JACKET SCBL KU 41-08 50133207170000 224005 4/11/2024 AK E-LINE GPT/Perf/CIBP MPU F-30A 50029226230100 213188 4/12/2024 READ CaliperSurvey MPU S-13 50029230930000 202114 4/16/2024 READ Caliper Survey NCI A-17 50883201880000 223031 3/22/2024 AK E-LINE Perf Paxton 6 50133207070000 222054 4/14/2024 AK E-LINE GPT/Perf PBU PTM P1-13 50029223720000 193074 4/8/2024 YELLOW JACKET CBL SRU 232-15 50133207140000 223091 3/28/2024 YELLOW JACKET GPT-PLUG-PERF SRU 232-15 50133207140000 223091 4/22/2024 YELLOW JACKET PLUG-PERF SRU 241-33B 50133206960000 221053 4/12/2024 YELLOW JACKET GPT-PERF SRU 241-33B 50133206960000 221053 4/4/2024 YELLOW JACKET GPT-PERF Please include current contact information if different from above. T38745 T38746 T38746 T38746 T38747 T38748 T38748 T38749 T38750 T38751 T38752 T38753 T38754 T38754 T38755 T38755 MPU F-30A 50029226230100 213188 4/12/2024 READ CaliperSurvey Meredith Guhl Digitally signed by Meredith Guhl Date: 2024.05.13 09:32:35 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, December 22, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC F-30A MILNE PT UNIT F-30A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 12/22/2022 F-30A 50-029-22623-01-00 213-188-0 W SPT 7059 2131880 1765 1594 1583 1583 1600 534 549 549 549 REQVAR P Bob Noble 11/5/2022 MIT-IA every two years per AIO 10B.017. 30 MinPretest Initial 15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name: MILNE PT UNIT F-30A Inspection Date: Tubing OA Packer Depth 245 2424 2394 2386IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN221110155659 BBL Pumped:4 BBL Returned:4 Thursday, December 22, 2022 Page 1 of 1 From:Wallace, Chris D (CED) To:AOGCC Records (CED sponsored) Subject:FW: MPF-30A (PTD#213188) AA request Date:Thursday, November 18, 2021 10:56:55 AM From: Wallace, Chris D (CED) <chris.wallace@alaska.gov> Sent: Wednesday, November 17, 2021 10:10 PM To: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: Re: MPF-30A (PTD#213188) AA request Oliver, Continued injection operations is approved while the applicatiin is processed. Regards, Chris From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Wednesday, November 17, 2021 5:05:06 PM To: Wallace, Chris D (CED) <chris.wallace@alaska.gov> Subject: MPF-30A (PTD#213188) AA request Chris, Do we have permission to continue injection into MPF-30A while the AA request for continued operation with slow TxIA is being processed by the AOGCC? Thanks, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Engineer Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. From:Wallace, Chris D (CED) To:AOGCC Records (CED sponsored) Subject:FW: Milne Point F-30A (PTD# 213188) IA repressurization Date:Monday, October 25, 2021 9:14:58 AM Attachments:image001.png image002.png image003.png From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Wednesday, October 20, 2021 3:56 PM To: Wallace, Chris D (CED) <chris.wallace@alaska.gov> Cc: David Haakinson <dhaakinson@hilcorp.com>; Regg, James B (CED) <jim.regg@alaska.gov> Subject: Milne Point F-30A (PTD# 213188) IA repressurization Mr. Wallace, WAG injector Milne Point F-30A (PTD# 213188) was found upon review of long- term annulus pressure trends to show signs of slow IA repressurization when on injection. The last AOGCC witnessed MIT-IA was conducted on 11/15/2020 which passed to 1800 psi. We plan to leave the well on injection to aid in diagnostics. Annulus pressures will be maintained under MOASP while diagnostics are performed, if the IA pressure cannot be managed with periodic bleeds the well will be shut-in. Plan forward: 1. PPPOT-T, PPPOT-IC. 2. Bleed OAP, Monitor. 3. Request Administrative Approval for continued injection with slow IA repressurization as necessary. Please contact me with any questions or concerns. Regards, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Engineer Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above,then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systemsor data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM To: Jim Regg P.I.Supervisor C� IZ(I iiG r FROM: Lou Laubenstein Petroleum Inspector Well Name MILNE PT UNIT F -30A Insp Num: mitLOL201116093617 Rel Insp Num: State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, November 23, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp Alaska, LLC F -30A MILNE PT UNIT F -30A NON -CONFIDENTIAL API Well Number 50-029-22623-01-00 Permit Number: 213-188-0 Packer Depth Well F -30A (TypeInj w' TVD PTD 2131880 !Type Testi SPT !Test psi BBL Pumped: 3.2 IBBL Returned: Interval 4vxTST P/F Notes' Standard 4 year test 7059 ' Tubing 1765 IA 3.3 OA P �- Src: Inspector Reviewed By: P.I. Supry r Comm Inspector Name: Lou Laubenstein Inspection Date: 11/15/2020 ,, Pretest Initial 15 Min 30 Min 45 Min 60 Min —14W7[— [— 1470 1468, 1466 178 2109 2084 2077 496 508 509 509 Monday, November 23, 2020 Page I of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission 1 DATE: Tuesday,November 22,2016 TO: Jim Regg � 60.2-itto P.I.Supervisor l'J SUBJECT: Mechanical Integrity Tests tt HILCORP ALASKA LLC F-30A FROM: Bob Noble MILNE PT UNIT KR F-30A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry ilie- NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT KR F-30A API Well Number 50-029-22623-01-00 Inspector Name: Bob Noble Permit Number: 213-188-0 Inspection Date: 11/13/2016 Insp Num: mitRCN161113165356 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well F-30A -!Type Inj W TVD 7059 Tubing 936 943 941 940 - PTD 2131880 Type Test SPT Test psi 1765 ' IA 22 2020 - 1994 - 1988 - Interval ICTAL P/F P ✓ OA 453 469 • 470 . 470 - L — Notes: • SC A�� j11r4 (l ?. 11 • Tuesday,November 22,2016 Page 1 of 1 (Vl R F-3O,A 713 c Regg, James B (DOA) From: Wyatt Rivard <wrivard@hilcorp.com> Sent: Thursday, October 06, 2016 10:57 AM c!k,(o I lc, To: Regg, James B (DOA) Cc: Wallace, Chris D (DOA) Subject: Milne Point injector MPF-30A (PTD # 2131880) Attachments: MPF-30A TIO Plot.xlsx; MPU F-30A MIT WSR 11-26-13.pdf Jim, Milne Point injector MPF-30A (PTD #2131880) has been shut in waiting on a RWO of its offset producer since 5/7/16. Reviewing the well file, the well had a CTD sidetrack completed on 4/28/14. I am unable to locate an MIT-IA conducted post sidetrack. My records have the most recent MIT-IA conducted on MPF-30 (PTD# 195184) on 11/26/13.The test was unwitnessed and passed to 4154 psi. I checked with BPXA, and they confirmed this is the most recent MIT-IA in their records. The last AOGCC witnessed MIT-IA on the MPF-30 well file shows a passing MIT-IA to 2120 psi on 9/29/2012. The well is expected to remain shut in until sometime in November. Our plan forward is to obtain a shut-in MIT-IA to confirm integrity now and then we will notify the AOGCC when returning the well to injection in November for stabilization and witnessed MIT-IA testing. Additionally, I have gone through and verified that Hilcorp's other operable North Slope sidetracked injectors have all had MIT-lAs post sidetrack. Please let me know if you have any additional questions. Thank You, Wyatt Rivard Well Integrity Engineer 0: (907) 777-85471C: (509)670-8001 I wrivard@hilcorp.com SCANNED JUN 0 8 2017 3800 Centerpoint Drive,Suite 1400 1 Anchorage,AK 99503 Hilcorp Alaska s • awnloA 0 0 0 0 0 0 o 0 0 0 0 0 0 u-, o Ln o Ln o Lc ii M N N , f-1 V1 0 910Z/90/01 9T0Z/ZO/OT 910Z/8Z/60 9TOZ/bZ/60 9T OZ/OZ/60 910Z/91/60 9TOZ/ZT/60 910Z/80/60 91OZ/170/60 °L' 9TOZ/T£/80 9TOZ/LZ/80 I 9TOZ/£Z/80 9TOZ/6T/80 9T0Z/ST/80 9TOZ/TT/80 910Z/LO/80 910Z/£0/80 91OZ/0£/LO 9T0Z/9Z/L0 0 9TOZ/ZZ/L0 I CZ 9TOZ/8T/LO O 9TOZ/bT/LO H 9TOZ/OT/LO Q 9TOZ/90/LO 0 m 9TOZ/ZO/LO a 9TOZ/8Z/90 2 9T0Z/bZ/90 9T0Z/OZ/90 g 910Z/91/90 I 9TOZ/ZT/90 910Z/80/90 91OZ/b0/90 9T0Z/T£/S0 9TOZ/LZ/S0 9T0Z/£Z/S0 9T0Z/6T/S0 9T0Z/ST/S0 .(c129T0Z/TT/S0 • 9T0Z/LO/S0 I j f 9T0Z/£0/SO 91OZ/6Z/b0 9T0Z/SZ/b0 9TOZ/TZ/b0 9T0Z/LT/b0 9T0Z/£T/b0 •--.--' 91OZ/60/170 8 e e e 8 e 8 0 n o 2 o Ln o Ln m m N N .--i .--i aanssaad WSR - MPF-30 - 11/26/201lb • Page 1 of 1 WELL SERVICE REPORT WELL DATE JOB SCOPE DAY SUPV MPF-30 11/26/2013 CTD SCOLES AFE CODE DAILY WSR COSTS DAILY WORK NIGHT SUPV $1,268 MIT-IA; PUMP WILLIAMS-NATHAN MIN ID DEPTH TTL SIZE KEY PERSON UNIT 0" 0 FT 0" LRS-VONBARGEN LRS 64 DAILY SUMMARY 780/0/400 MIT-IA to 4200 psi PASS. Pumped 7.3 bbls diesel to reach test pressure, lost 46 psi in the first 15 mins and 11 psi in the second. Bled back+/-7 bbls. Final WHPs=770/0/410 LOG ENTRIES [nit Tbg, IA, OA-> 780 0 400 TIME BPM BBLs FLUID TEMP TBG IA OA COMMENTS 20:00 Start ticket, Spot equiptment, PJSM, Rig onto IA, Barriers updated 20:27 Start pressuret test 20:48 Pressure test pass 4800,trip set 4300, Check valve pass 20:58 .75 0 diesel 40 780 0 400 Online down IA 21:05 .5 4 " " 850 2500 440 21:12 0 7.3 " " 812 4211 460 Stop pumping, Start test 21:27 787 4165 466 First 15 lost 46 psi 21:42 786 4154 465 Second 15 lost 11 psi PASS, Start bleeding pressure 22:31 770 0 410 Shut in bleed, start rig down 23:59 End ticket leave locaiton Final Tbg,IA,OA-> 770 0 410 FLUID SUMMARY 7 bbls diesel MIT TEST WELL TYPE PWI TEST#1 REQUIRED TEST TEST TYPE FLUIDS USED TO TEST PRESSURE MIT-IA DIESEL 4,200 START TIME: 21:12 PRE TEST INITIAL 15 MINUTE 30 MINUTE PASS OR PRESSURES PRESSURES PRESSURES PRESSURES FAIL TUBING 780 812 787 786 IA 0 4,200 4,165 4,154 PASS OA 400 460 466 465 COMMENTS Used 7.3 bbls diesel to reach test pressure, bled back+/-7 bbls Safety Notes NA JOB COSTS SERVICE COMPANY-SERVICE DAILY WSR COST CUMUL TOTAL LITTLE RED $1,268 $1,268 TOTAL FIELD ESTIMATE: $1,268 $1,268 http://swis.hilcorp.com/WEApp/awg-action-report.aspx?wellActiv ityId=0B52894A711 A4... 10/6/2016