Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
193-049
WELL LOG TRANSMITTAL 4905901064 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Static Bottom Hole Pressure Record: 1H-13 Run Date: 8/10/2019 19 �0 49 3 136 6 October 17, 2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of. Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS—ANC@haRiburton.com 1H-13 Digital Data in LAS format, Digital Data in XLSX format 1 CD Rom 50-029-22356-00 RECEIVED OCT 2 3 2019 AOGCC PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS—ANC@halliburton.com Signed: )F'/ Co no co Phil lips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 December 29,2006 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 SCANNED JAN 1 6 2007 Anchorage, AK 99501 ...()~~ \~"J Dear NIL Maunder: Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor by surface casing annulus. The voids were fIrst fIlled with cement to a level 0 f approximately 1. 0 foot. The remaining vo lume 0 f annular void respectively was coated with a corrosion inhibiter, RG2401 that was engineered to prevent water trom entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement top-fill operation was completed on December 16, 2006 and the sealant top was completed on December 27,2006 for IH-Pad and December 28, 2006 for ID-Pad. Schlumberger Well Services mixed 15.7 ppg Expando cement in a blender tub. The cement was pumped into the conductor bottom and cemented up via a hose run to the existing top of cement. The 2401 sealant was pumped in a similar manner. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call myself or M.l Loveland at 907-659-7043, if you have any questions. Sincerely, ~-/cD~ Jerry Dethlefs ConocoPhillips Problem Wells Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement and Sealant Top-off Kuparuk Field 12/29/2006 Initial Top Cement Final Top Sealant Well Name PTD# of Cement Volume of Cement Cement Volume Sealant Feet Barrels Feet Oate Gallons Oate 1 H-01 193-006 12" na 12" na 7.4 12/27/2006 1 H-02 193-008 21' 4" 2.9 14' 6" 12/16/2006 na na 1 H-1 0 193-030 4' na 4' na 29 12/27/2006 1 H-11 193-036 Surface na Surface na 1 12/28/2006 1 H-12 193-044 4'8" 0.6 8" 12/16/2006 4.98 12/27/2006 1 H-13 193-049 6' 0.8 4' 12/16/2006 29 12/27/2006 1 H-14 193-052 35' 4.7 12" 12/16/2006 7.4 12/27/2006 1 H-18 193-020 14'4" 2.7 12" 12/16/2006 7.4 12/27/2006 1 H-21 193-046 4" na 4" na 2.4 12/27/2006 1 H-401 198-101 45' 4.4 18" 12/16/2006 20.1 12/27/2006 1 0-109 197-235 10'9" 2.1 12" 12/16/2006 10.8 12/28/2006 10-110 200-039 8'6" 1.4 10" 12/16/2006 9 12/28/2006 10-111 198-166 17' 7" 3.4 25" 12/16/2006 21 12/28/2006 10-120 197-221 13' 6" 2.9 18" 12/16/2006 16 12/28/2006 10-121 197-181 13' 2.2 20" 12/16/2006 16.2 12/28/2006 1 0-132 198-121 10'8" 2.0 14" 12/16/2006 11 12/28/2006 10-133 197-206 6' 1.0 6" 12/16/2006 4.6 12/28/2006 1 0-136 200-046 10'2" 2.0 10" 12/16/2006 6.4 12/28/2006 10-137 200-047 11 ' 2.00 24" 12/16/2006 13.2 12/28/2006 10-138 200-048 11' 7" 2.3 4'6" 12/16/2006 29.7 12/28/2006 1 0-139 200-049 11' 2" 2.2 18" 12/16/2006 9.9 12/28/2006 1 0-140 200-136 29'9" 3.4 12" 12/16/2006 na na THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE DECEMBER 01 2OOO PL M A T T H E IA L UN IS M ARK D W E R E R C :LORIkMFILM.DOC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown ~ Pull tubing Alter casi'i~5."'" Type of Well: 2. Name of Operator · I Development ARCO Alaska, Inc. I Exploratory _ 3. Address I Stratigraphic ~ P. O. Box 100360, Anchorage, AK 99510 I Service 4. Location of well at surface 709' FNL, 790' FEL, Sec 33, T12N, R10E, UM At top of productive interval 1308' FNL, 1593' FWL, Sec 35, T12N, R10E, UM At effective depth 1338' FNL, 2104' FWL, Sec 35, T12N, R10E, UM At total depth 1348' FNL, 2187' FWL, Sec 35, T12N, R10E, UM Stimulate X Plugging_ Repair well __ 12. Present well condition summary Total Depth: measured true vertical 1 1 1 72 feet 681 6 feet Perforate Other 6. Datum elevation (DF or KB) RKB 96 feet 7. Unit or Property name Kuparuk River Unit 8. Well number 1H-13 9. Permit number/approval number 93-49 10. APl number 50-029-22356 11. Field/Pool Kuparuk River Oil Field/Pool Plugs (measured) None Effective depth: measured 1 1 0 8 4 feet true vertical 6787 feet Junk (measured) None Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size 121' 16" 6447' 9.625" 1O1OO' 7" 11128' 5" measured 10532'-10676' true vertical 6600'-6650', Cemented Measured depth 200 SX PFC CMT 1 21 ' 1330 SX PF E CMT & 6488' 500 SX Class G CMT 210 SX G & 10139' 130 SX Class G CMT 1 1 1 71 ' , 10695'-10772', 10884'-10982' 6656'-6682', 6720'-6753' Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 10453' Packers and SSSV (type and measured depth) PKR: Baker 'HB' Retr. @ 9773'; SSSV: Camco TRDP-4A-RO @ 1808' True vertical depth 121' 4395' 6463' 6816' -JUL. 2 % 1997 13. Stimulation or cement squeeze summary /~as~a Oil .& Gas Cons, C0[~ts~ "C" Sand FRAC 7/6/97 ..... Intervals treated (measured) ~ ~-~-g.~';"' 10532'-10676', 10695'-10772', 10884'-10982' Treatment description including volumes used and final pressure Screend out to surface. Injected 207152# of Prop in the formation w/10# PPA of #12/18 @ the Perfs. Maxiumum pressure 7800 PSI and F.G. (.76). 14. Representative Daily Average Production or Ir~iection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 7 7 2 5 0 5 5 0 800 254 Subsequent to operation 81 7 4 5 41 0 1500 299 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed /15/88 Title Wells Superintendent Date 0'7219 7 Form 1 SUBMIT IN DUPLICATE ARCO Alaska, Inc. KUPARUK RIVER UNIT '' WELL SERVICE REPORT ~ K1(1H-13(W4-6)) WELL JOB SCOPE JOB NUMBER 1H-13 FRAC, FRAC SUPPORT 0524971947.8 DATE DAILY WORK UNIT NUMBER 07/06/97 "C" SAND FRAC DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 5 (~) Yes O NoI (~) Yes O No DS-YOAKUM CHANEY FIELD AFC_~ CC.4f DALLY COST ACCUM COST Sir~neri .~ f' ESTIMATE KD1027 230DS10HL $145,749 $187,775 ,~?/-"~1~-'- i.._...k..~____~.~' Initial Tb.q Press Final Tb.q Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ar~rr 1200 PSI 1500 PSI 500 PSI 500 PSII 0 PSII //',.~ 'PSI DALLY SUMMARY "C" SAND FRAC COMPLETED. SCREENED OUTTO SURFACE. INJECTED 207152 LBS OF PROP IN THE FORMATION W/10# PPA OF I #12/18 @ THE PERFS. MAXIMUM PRESSURE 7800 PSI AND F.G. (.76). I TIME 06:30 08:30 08:45 09:20 10:30 LOG ENTRY MIRU DOWELL FRAC UNIT, APC PUMP TRUCK, & APC VAC TRUCK. HELD SAFETY MEETING (16 ON LOCATION) PT'D BACKSIDE LINES TO 4000 PSI AND RAISED INNER CSG PRESSURE AS REQUIRED. SET TREESAVER AND PT'D HIGH PRESSURE LINES TO 9200 PSI. PUMP BREAKDOWN W/50# DELAYED XL GW @ 30 TO 15 BPM. VOLUME PUMPED 510 BBLS. USED 6659 LBS OF #20/40 PROP. MAXIMUM PRESSURE 7800 PSI AND ENDING PRESSURE 3500 PSI. S/D AND OBTAINED ISIP 2110 PSI W/F.G. (.76). MONITORED WHTP & PULSED FOR CLOSURE. PUMP DATAFRAC W/50# DELAYED XL GW @ 5 TO 15 BPM. VOLUME PUMPED 263 B. BLS. MAXIMUM PRESSSURE 6600 PSI AND ENDING PRESSURE 4000 PSI. S/D AND ISIP OF 2440 PSI W/F.G. @ (.81). STOOD-BY FOR CLOSURE. PUMP FRAC W/50# DELAYED XL GW @ 5 TO 15 BPM. SCREENED OUT TO SURFACE. VOLUME PUMPED 2300 BBLS. MAXIMUM PRESSURE AND ENDING PRESSURE 6600 PSI. PUMPED 235560 LBS OF PROP ( 22000 LBS OF #20/40 & 213560 LBS OF #12/18). INJECTED 207152 LBS OF PROP IN THE FORMATION W/10# PPA OF #12/18 @ THE PERFS. LEFT 28408 LBS OF PROP IN THE WELLBORE. 13:30 STARTED R/D. DEPRESSURED THE INNER CSG TO 500 PSI AND R/D APC PUMP TRUCK. 14:00 15:00 REMOVED TREESAVER (ALL CUPS RETURNED). CONTINUED R/D. R/D COMPLETE AND DOWELL LEAVING LOCATION. WELL SECURED AND NOTIFIED DSO OF STATUS. jUi ~-~:" ]99/' SERVICE COMPANY - SERVICE DAILY COST ACCUM TOTAL $0.00 $2,324.00 APC $8,800.00 $18,700.00 BAKER OIL TOOLS $0.00 $1,806.00 DIESEL $250.00 $1,400.00 DIESEL GEL $0.00 $580.00 DOWELL $136,700.00 $154,438.00 HALLI BU RTO N $0.00 $4,870.00 LITFLE RED $0.00 $3,658.00 TOTAL FIELD ESTIMATE $145,750.00 $187,776.00 ,~ e ,:'~ 'I o a ~' c a '1 1'4 c*.' t ~ r' 'i' a 1 s ,"-'" .... E i:;il H ..T..i ~l"D A T A T D A 'i' A ...... F' I... U S 9 3 .... 0 ?.,,.. 9 !!}; I..I R V E Y ~" D Z IR El (.'; T Z O i",J A I.... 9 3 (..3 ~.~. 9 :i!!; L! F;,' V i:? Y ~ r"...,c, ex'ii!; 8 D I R E C T I O i".~. A I.. C O bi i','i E i'4 TS i 't o ARCO Alaska, Inc. Pest Office Bo× 'i00360 ~c~orage~ A~aska 99510-0360 Telephone 907 276 1215 November 1, 1993 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston' Attached in duplicate are multiple Reports of Sundry Well Operations (Form 10-404) notices in the Kuparuk field. The wells are listed below. WELL ACTION 1H-13 Stimulate 1H-21 Stimulate If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Engineer Kuparuk Petroleum Engineering .A.t~sk3. 0[! & Gas Cons. Cot. nf~fiss\[~'<'; ARCO Alaska, !nc. is a Subsidiary of AtlanticR chf e dComDany STATE OF ALASKA ~ OIL AND GAS GONSERVATION C.,OMMIS~ REPORT OF SUNDRY WELL OPERATIONS Operations Performed: Operation Shutdown Stimulate X Plugging Pull tubing Alter casing Repair well 2. Name of Operator ARCO Alaska, Inc, 3, Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 709' FNL, 790' FEL, Sec 33, T12N, R1 At top of productive interval 1308' FNL, 1593' FWL, Sec 35, T12N, At effective depth 1338' FNL, 2104' FWL, Sec 35, T12N, At total depth 1348' FNLr 2187' FWL, Sec 35, T12Nr 12. Present well condition summary Total Depth: measured 1 1 true vertical 68 5. Type of Well: Development X Exploratory .- Stratigraphic _ Service 0E, UM R10E, UM R10E, UM R10Er UM 1 72 feet 1 6 feet Perforate Other 6. Datum elevation (DF or KB) 7. Unit or Property name River Unit 8, Well number 1H-13 9, Permit number/approval number 93-49 10. APl number 5o-029-2235§ 11. Field/Pool Kuparuk River Oil Field/Pool Plugs (measured) None Effective depth: measured 1 1 0 8 4 true vertical6787 feet feet Junk (measured) None Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 121' 16" 6447' 9.625" 10100' 7" 11128' 5" measured 10532'-10676', true vertical 6600'-6650', 2OO SX PFC CMT 1330 SX PF E CMT & 500 SX Class G CMT 210SX G& 130 SX Class G CMT 121' 6488' 10139' 11171' 10695'-10772', 10884'-10982' 6656'-6682', 6720'-6753' True vertical depth 121' 4395' 6463' 6816' RE .IE VE N 0\! - 199; Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 10453' Packers and SSSV (type and measured depth) PKR: Baker 'HB' Retr. @ 9773'; SSSV: Camco TRDP-4A-RO ~ 1808' Alaska 0il & Gas 00as. 00mmissio~ 13. Stimulation or cement squeeze summary Anchorage "C" Sand Acid Stimulation on 10/16/93. Intervals treated (measured) 10532'-10676', 10695'-10772', 10884'-10982' Treatment description including volumes used and final pressure Pumped 8000 scf N2 & 85 bbls of 11.6% HCI/diesel w/ 500 scf/bbl N2~ final whtp was 3269 psi. 14. Reoresentative Daily Average Production or In!ection Dat~ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments ~ 16. Status of well classification as: Copies of Logs and Surveys run m I Daily Report of Well Operations ~( Oil X Gas Suspended, 17. I~~~ ~ here certify that the foregoing is true and correct to the best of my knowledge. Signed . Title Senior Engineer Fnrm 1N-4N4 ' R~.v NR/I~/RR 7 7 2 5 0 5 5 0 800 254 81 7~ ~'4 5 41 0 1500 299 Service gl IRMIT IN r'tl IPl ICATF ARCO Alaska, Inc. A Subsidiary of Atlantic Richfield Company WELL DESCRIPTION OF WORK 1H- 13 MATRIX ACID STIMULATION DATE ' CONTRACTOR / KEY PERSON 10-16-93 DOWELL-SCHLUMBERGER/GALLEGOS FIELD COST EST. $16562.00 KUPARUK RIVER UNIT 1 WELL SERVICE REPORT AFC/CC# - SCA # 998033/80528 ACCUMULATED COST $16562.00 ,,. DAY 1 TIME PBTD (RKB) 11084' LAST TAG (RKB) / DATE 11084'/4-12-93 (SITP 3300~7"CP 1500~-9-5/8"CP 600~) SSSV TYPE / STATUS CAMCO TRDP-4A/IN SERVICE I'(L/PA,r'~UK PETROLEI.)M ENGINEEF~ING LOG ENTRY 0800 MLRU DS & PEAK TRANSPORT-RU PUMP LINES 0920 HELD SAFETY MEETING ! 0935 PT PUMP LINES TO 4000g OK! 0945 1018 1027 1033 1038 1043 1048 1053 1101 1226 1237 1245 1304 1335 1345 START PUMPING DIESEL @ .5 BPM-GRADUALLY INCREASED TO 4 BPM (SITP 3300g) CUT RATE TO 2.75 BPM-DISPLACED WELL W/95 BBLS DIESEL-WHTP 2700g CUT RATE TO .5 BPM TO BEGIN STEP RATE TEST FOR 9 MIN-WHTP 2321# INCREASE RATE TO 1.0 BPM FOR 6 MIN-WHTP 2577# INCREASE RATE TO 1.5 BPM FOR 5 MIN-WHTP 2696g INCREASE RATE TO 2.0 BPM FOR 5 MIN-WHTP 2966g INCREASE RATE TO 2.5 BPM FOR 5 MIN-WHTP 3214g INCREASE RATE TO 2-3/4 BPM FOR 5 MIN-WHTP 3314g SHUTDOWN PUMPING DIESEL-STARTUP N2 @ 1000 SCFM FOR 8 MIN-WHTP 3200g- (PUMPED TOTAL 150 BBLS DIESEL) PUMPED 8000 SCF N2-START PUMPING ACID @ 1.0 BPM WI500 SCFM N2-WHTP 3378# START DIESEL FLUSH -1.75 BPM @ WHTP 3410g-(PUMPED TOTAL OF 85 BBLS ACID @ 1.0 BPM W/500 SCFM N2-WHTP 3360g) CUT RATETO 1.0 BPM @ 3338# WHTP WI18 BBLS DIESEL DOWN TBG WHTP 3268# W/27 BBLS DIESEL DOWN TBG WHTP 3175# W/46 BBLS DIESEL DOWN TBG-BOOST RATE TO 1.5 BPM-WHTP 3268# SHUTDOWN-PUMPED 92 BBLS DIESEL-ACID @ TOP PERFS-FINAL WHTP 3269# RDMO TO 1H-21 NOV- 3 Alaska Oil & iias -t;oi~s. t,:.,,[~m',:ss~'.-,' ~nchorarle Weather ] TemP. l' Chill Factor ! Visibility I Wind ' ' ~'lW. ARK~ CONTINUED: SUMMARY PUMPED MATRIX ACID STIMULATION AS PER PROCEDURE-FINAL WHTP 3269# TURNED WELL OVER TO DSO FOR FLOWBACK TO SYSTEM AND SAMPLING! 2500g S1TP @ 1310 (7" CP 1750-10" 1100~) ACID TITRATE SAMPLE 11.6 ACCUM. SERVICE COMPANY DOWELL-SCHLUMBERGER DAILY $14092.00 TOTAL $14092.00 PEAK 1454.00 1454.00 DIESEL (242 BBLS) 1016.00 $16562.00 TOTAL FIELD ESTIMATE 1016.00 $16562.00 NOW ,Aiask~ Oil & Gas Cons. ,;..,.~,~ .~ss~ Anchora~m ARCO Alaska, Inc. Date: August 20, 1993 Transmittal #: 8838 RETURN TO: ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following ~ items. receipt and return one signed copy of this transmittal. Y-23 Y-23 Y-23 H-14 H-14 H-13 H-13 H-13 Y-17' Y-17 Y-17 H-01 H-02 H-09 ,¢CDN LWD/Depth Corrected "~C D R Very-enhanced LWD/Depth Corrected · ,'CDR LWD/Depth Corrected ,.,.'CDR LWD/Depth Corrected v,,-CDR Enhancement LWD/Depth Corrected ~CDR Enhancement LWD/Depth Corrected v'CDN LWD/Depth Corrected ~CDR LWD/Depth Corrected v'CDR Enhancement LWD/ Depth Corrected ~'CDR ~,"' CDN v"CDR Enhancement LWD/ Depth Corrected v-CDR Enhancement LWD/ Depth Corrected ~CDR Enhancement LWD/ Depth Corrected 7-06-93 7-06-93 7-06-93 5-18-93 5-18-93 6-01-93 6-01-93 6-01-93 6-18-93 6-18-93 6-18-93 3-05-93 3-05-93 4-26-93 Receipt Acknowledged: DISTRIBUTION: Please acknowledge 3739-7499 3746-7497 3739-7499 4695-10524 4786-10522 6368-1O165 6360-10167 6360-10167 4338-8025 4320-8045 7360-8045 7188-7942 7388-8037 1 0855-11750 Date: ARCO Alaska, Inc. Date: August 6, 1993 Transmittal #: 8826 RETURN TO: ARCO Alaska, Inc. Attn: Sarah Bowen Kuparuk Operations File Clerk ATO- 1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. and return one signed copy of this transmittal. 1 H-13 LIS Tape and Listing: 6-03-93 · ~ ~-_~?~ , CDR/CDN in 1 Bit Run, QRO Processed 1 H-22 rD\A~ LIS Tape and Listing: 6-11-93 CDR/CDN & QRO Enhanced Resistivity Please acknowledge receipt 93155 932O6 Receipt Acknowledged: DISTRIBUTION: Bob Ocanas State of Alaska Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIboION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL ~] GAS r-~ SUSPENDED ~ ABANDONED [] SERVICE ~-~ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 93-49 3 Address i8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22356 ~-'~'~ l~,"~,~ 9 Unit or Lease Name 4 Location of well at surface ~ C0J¥i~ll,~-~-~ 709' FNL, 790' FEL, SEC 33, T 12N, R 10E, UM I - ~'A,E ' ! YEIII~.~ .t~D KUPARUK RIVER At Top Producing Interval-~,~' ~" ~, 10 Well Number 1308' FNL, 1593' FWL, SEC 35, T 12N, R 10E, UM~ ,/~'~/--~'~ ~/F(EQ ,i~J '-'""~ I~~' -' it 1H-13 At Total Depth ~~"---' i ! 11 Field and Pool 1348' FNL, 2187' FWL, SEC 35, T 12N, R 10E, UM KUPARUK RIVER 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. RKB 96', PAD 54' GL ADL 25638 ALK 463 12 Date Spudded 13 Date T.D. Reached 114 Date Comp., Susp. or Aband. 15 Water Depth, if offshore 116 No. of Completions 28-Mar-93 10-Apr-93 06/22/93.(Comp) NA feet MSLI 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey['~ ~'] 120 Depth where SSSV set I 21 Thickness of permafrost 11172' MD, 6816' TVD 11084' MD, 6787' TVD YES ~ NO __ 1808' feet MD 1800' APPROX 22 Type Electric or Other Logs Run CDR, CDN, CET, CBT, HLDT, GCT 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT GRADE TOP BTM HOLE SIZE CEMENT RECORD 16" 62.5# H-40 SURF 121' 24" 200 SX PFC CMT 9.625" 47#/36# L-80/J-55 SURF 6488' 12.25" 1330 SX PF E CMT, 500 SX CLASS G CMT 7" 26# L-80/J-55 SURF 10139' 8.5" 210 SX G 5"(Liner) 18# L-80 9843' 11171' 130 SX CLASS G CMT 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) iSIZE DEPTH SET (MD) PACKER SET (MD) 3.5" 9.3# J-55 10453' 9773' 10532'-10982' 6 SPFW/4-1/2" CSG GUN MD 6600'-6753' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ,,. 27 PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD I~ FIowTubing Casing Pressure CALCULATED OIL-BBL GAS~MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE i~ 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. REEEIVE J U 1 ?. 8 1 Anchorage, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUE VERT. DEPTH GOR, and time of each phase. --. TOP OF KUPARUK C 10539' 6602' , 31. LIST OF A~ACHMENTS RE~RT OF OPE~TIONS, 2 COPIES OF DIRECTION~ SURV~ 32. I hereby certify that the foregoing is true and correct to the best of my knowlege. Signed ~~~~ Title ~~¢ ~ DATE ~~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO ALASKA INC. DAILY OPERATION£ PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT: APPROVAL: 1H-13 NORTH SLOPE KUPARUK RIVER KUPARUK RIVER ADL 25638 ALK 463 50-029-22356' 93-49 ACCEPT: 03/28/93 05:30 SPUD: 03/28/93 09:00 RELEASE: 06/22/93 05:00 OPERATION: DRLG RIG: PARKER 245 WO/C RIG: NORDIC 1 03/29/93 (1) PARKER 245 TD: 1260' (1260) 03/30/93 (2) PARKER 245 TD: 5220' (3960) 03/31/93 ( 3) PARKER 245 TD: 6502' (1282) 04/01/93 ( 4) PARKER 245 TD: 6502'( o) 04/02/93 (5) PARKER 245 TD: 8188' (1686) DRILL & MWD SURV 16"@ 121' MW: 9.3 VIS: 70 MVE RIG F/1H-21 TO 1H-13. NU 20" ANN, FUNCTION TEST, CLOSING TIME 45 SEC. FILL HOLE W/MUD & CHECK FOR LEAKS, NO LEAKS. PU BHA, ORIENT MWD, SPUD WELL @ 21:00 HRS 03/28/93. DRILL & MWD SURV TO 1260'. DRILL & MWD SURV 16"@ 121' MW:10.5 VIS: 54 DRILL & MWD SURVEY. SERV RIG & TOP DRIVE. DRILL & MWD SURV. CBU, PMP SLUG. MAKE 24 STD SHORT TRIP, HOLE TIGHT & SWABBING. DRILL & MWD SURVEY. POOH 9-5/8"@ 6488' MW:10.5 VIS: 46 DRLG 12.25" HOLE F/5220'-5285'. CBU. PMP SLUG. POH FOR BIT. TIGHT @ 4400' & 2911' CHANGE BIT, ORIENT TOOLS. RIH. TEST MWD @ HWDP. FTIH-NO FILL. DRLG 12.25" HOLE F/5285'-5397'. SERV RIG & TOP DRIVE. DRLG 12.25" HOLE F/5397'-6502'. CIRC & COND MUD. PMP SLUG. POOH TO RUN 9-5/8" CSG. TESTING BOPE'S 9-5/8"@ 6488' MW:10.5 VIS: 43 POH TO RUN 9-5/8" CSG-SWABBED F/2200'-1800'. LD BHA FOR INSPECT. SLM-NO CORR. RU CASERS. HOLD SAFETY MEETING. RUN 87 JTS 9-5/8" 36# J-55 & 70 JTS 47# L-80 CSG. CIRC @ 3000' & 5000' MU HGR, LANDING JT,& CMT HD. CIRC & COND MUD & HOLE FOR CMT JOB. CIRC 900 BBL TOTAL. SWITCH TO HOWCO. PMP 5 BBLS WATER. DROP 1ST PLUG. TEST LINES TO 3000 PSI. DROP 2ND PLUG. PMP 514 BBLS LEAD CMT & 102 BLS TAIL CMT. DROP TOP PLUG. DISPLACE CMT WITH 483 BBL MUD. 11.5 PPG CMT RETURNS W/283 BBLS PMP. 12.0 PPG CMT RETURNS W/325 BBLS PMP. CIP @ 24:00 HRS 03/31/93. DID NOT BMP PLUG. CHECK FLOATS-HELD OK. ND DIVERTER SYSTEM. INSTALL 11" 3000 PSI BRADEN HEAD 18000 FT/LB. NU 13-5/8-5000 BOP STACK. TESTING BOPS. TEST WAIVED BY LOU GRIMALDI OF AOGCC. DRILLING 9-5/8"@ 6488' MW: 8.9 VIS: 33 FIN TESTING BOPE TO 300 PSI & 3000 PSI. PULL TEST PLUG, SET WEAR BUSHING, BLOW DN CHOKE MAN. PU BHA & ORIENT TOOL, PROGRAM LWD TOOLS, LOAD SOURCE. TEST MWD @ 400' FIN PU BHA, CHANGE OUT JAR-RIH TAGGED UP @ 6389'. FILL PIPE, CIRC 10 MIN. C/0 CMT T~ 6394'. TEST 9-5/8" CSG TO 2000 PSI FOR 30 MIN. HELD. NO LEAK-OFF. DRILL OUT PLUGS, FC @ 6410' & FS @ 6488'. DRILL NEW HOLE TO 6512'. CBU. RAN EMW TEST. DRILL 8.5" HOLE F/6512'-8188' WELL: 1H-13 API: 50-029-22356 PERMIT: 93-49 PAGE: 2 04/03/93 (6) PARKER 245 TD:10152' (1964) 04/04/93 ( 7) PARKER 245 TD:10152' ( o) 04/05/93 (8) PARKER 245 TD:10152' ( o) POOH 9-5/8"@ 6488' MW: 9.9 VIS: 38 DRLG & SURV 8.5" HOLE F/8188'-9174'. WELL TAKING FLUID @ 2 BPM. LOST 100 BBLS. MUD WT IN 12.3 PPG. MUD WT OUT 11.6-12.0 PPG. CIRC SLOWLY WHILE CUTTING MUD WT TO 10.0 PPG. DRLG & SURV 8.5" HOLE F/9174'-10152'. CBU @ 10151'. PMP SLUG. POOH FOR SHORT TRIP. CIRC & COND F/CMT JOB 9-5/8"@ 6488' MW: 9.9 VIS: 39 MADE 40 STD SHORT TRIP TO 9-5/8" SHOE. TIGHT F/9450'-9350'. CUT DRLG LINE. TIH-NO FILL-HOLE IN GOOD SHAPE. CIRC & COND MUD & HOLE F/7" CSG. SLUG DP. POH. LD 91 JTS DP, 4 HWDP, JARS. REMOVE RA SOURCE, DOWN LOAD LWD. LD BHA. PULL WEAR BUSHING. RU CASERS. HOLD SAFETY MEETING. RUN 7" 26# J-55 & L-80 CSG TO 6400' CBU @ 6400' RUN 7" SAME TO 8000' BREAK CIRC @ 8~00'.- RUN 7" 26# J-55 & L-80 CSG TO 10139' PU LANDING JT. MU CMT HEAD. TESTING BOP'S 7"@10138' MW:10.1 VIS: 51 CIRC & COND MUD. RECIP CSG @ 10138' PREPARE TO CMT. HOLE IN GOOD SHAPE. CIRC 740 BBLS TOTAL. TEST HOWCO LINES TO 3000 PSI. PMP 5 BBLS WATER, 20 BBLS PRE-FLUSH, & 17 BBLS 11 PPG SPACER-CSG PACKED OFF-HOWCO PMP 1 BPM @ 1900 PSI-DRAGGING 75,000 ABOVE WT. SWITCHED TO RIG PMP & MUD. WORKING CSG FREE & ESTAB CIRC @ 6.5 BPM-800 PSI. RAN OUT OF PUMPING TIME ON CMT. CIRC & COND MUD, RAISE FUNNEL VIS F/42-52 SEC/QUART. WAIT ON LOADING OUT CMT & PILOT TEST. TEST HOWCO LINES TO 3000 PSI. PMP 20 BBLS PRE-FLUSH, 33 BBLS SPACER, 210 SX PREM "G" W/ADDITIVES, DISPLACE W/10 BBLS WATER & 374 BBLS MUD. RECIP PIPE W/FULL RETURNS. PLUG DID NOT BMP. PU STACK. LAND CSG W/175,000 LB ON SLIPS. MAKE ROUGH CUT ON 7". LD LANDING JT. RD CSG EQUIP. ND BOP STACK. LD RISER. MAKE FINAL CUT ON 7" CSG. INSTALL PACKOFF. NU TBG SPOOL. TEST PACKOFF TO 3000 PSI FOR 15 MIN-0K. FREEZE PROTECT 7" X 9-5/8" ANN W/100 BBL WATER & 100 BBL DIESEL @ 4 BPM & 1100 PSI. PU DSA & SHORT RISER. NU BOP STACK. CHANGE OUT BTM & TOP RAMS F/5" TO 3-1/2" INSTALL 3-1/2" SS IN TOP DRIVE. SET TEST PLUG. TEST CHOKE & BOP'S. Alaska Oil & Gas Coi}3. Comi'nissio~, WELL: 1H-13 API: 50-029-22356 PERMIT: 93-49 PAGE: 3 04/06/93 (9) PARKER 245 TD:10152' ( o) 04/07/93 (10) PARKER 245 TD:10312' ( 160) 04/08/93 (11) PARKER 245 TD:10429' ( 117) 04/09/93 (12) PARKER 245 TD:10750' ( 321) 04/10/93 (13) PARKER 245 TD:10990' ( 240) RIH 7"@10138' MW:10.2 VIS: 44 TEST BOP'S. BLIND RAMS LEAKING. TEST WITNESS WAIVED BY LOU GRIMALDI OF AOGCC. PULL BLIND RAMS-NO TEST, TEST PLUG LEAKING. PULLED 50,000 LBS TO UNSEAT TEST PLUG. RE-DRESSED TEST PLUG. TEST BLINDS-TEST PLUG DRIPPING. ATTEMPT TO PULL TEST PLUG. PULLED 100,000 LBS ON PLUG W/1000 PSI ON 7" CSG BELOW PLUG. TEST PLUG STUCK IN TBG HEAD. BLEED PRESS. LD TEST JT. ND BOP'S. BLEED PRESS OFF 9-5/8" X 7" ANN RECOVERED 70 BBLS DIESEL. ND 7-1/16" TBG HEAD. NU NEW TBG HEAD & TEST TO 3000 PSI FOR 20 MIN. HELD. SET NEW TEST PLUG IN HEAD. NU BOP'S. TEST STACK TO 300 & 3000 PSI. PULL TEST PLUG. INJ 100 BBLS DIESEL INTO 7" X 9-5/8" ANN. 1500 PSI FINAL INJECTION PRESS. INSTALL WEAR BUSHING. PU 6-1/8" BIT, MU BHA, ORIENT TOOLS. SERV RIG & TOP DRIVE. PU BHA. INSTALL MWD TOOL. TEST MWD @ 300' RIH PICKING UP 3-1/2" DP. FILL PIPE @ 300" DRILL & MWD SURV 7"@10138' MW:12.3 VIS: 53 PU 3-1/2" DP, FILL PIPE @ 7000'. REPAIR IRON ROUGHNECK & LD MACHINE SAFETY SWITCH. CONT TO PU 3-1/2" DP, TAG CMT @ 10024'. CLEAN OUT CMT F/10024'-10034' CIRC 1/4 HR, TEST CSG TO 2000 PSI FOR 1/2 HR, LOST 75 PSI. BLOW DOWN LINES. DRILL PLUGS, FC, & CMT TO 10110' CLEAN SUCTION PIT, START DOWNHOLE WITH 12.4 PPG MUD. DRILL CMT & SHOE CLEAN OUT TO 10152' CIRC 12.4 PPG MUD AROUND. DRILL F/10152' TO 10162'. CIRC 10 MIN, PERFORM INTEGRITY TEST @ 6432' TVD, MUD WT 12.35 PPG. PRESS FORM 220 PSI EMW=13.0 PPG. HOLD 5 MIN, NO LEAK OFF. DRILL & MWD SURV, GAMA IN ANADRIL MWD COLLAR NOT WORKING. TRIP FOR BIT 35 7"@10138' MW:12.3 VIS: 54 DRILL & MWD SURVEY. PMP SLUG. POH. PMP 2ND SLUG @ 80 STDS OUT, LD ANADRIL DOT TOOL. CHANGE BIT. ORIENT NAVI-DRIL. PU NEW ANADRIL DOT TOOL. SURF TEST-OK. RIH. DRILL 7 SURVEY 7"@10138' MW:12.3 VIS: 48 RIH, FILL PIPE @ 3500', 7000', & @ 10140' WORK W/ANADRIL DOT TOOLS TRYING TO SURVEY, UNABLE TO TURN TOOL ON. ROTATE & WASH F/10142'-10429'. ANADRIL TOOLS UP & SURVEYING. DRILL & SURVEY TO 10570' REPAIR GLYCOL LINES TO TOP DRIVE. DRILL & SURV, MAKE CORRECTIONS AS NEEDED. DRILL & SURVEY 7"@10138' MW:12.3 VIS: 50 DRILL & SURVEY TO 10865' PMP UP SURV, MONITOR WELL FOR FLOW, NONE, SLUG PIPE, START OUT OF HOLE. MONITOR WELL @ 7" SHOE, SERVICE RIG. POOH. CHANGE BITS & CHECK NAVI-DRIL-OK. RIM TO 6700', FILL PIPE @ 3000'. REPAIR IRON ROUGHNECK. FILL PIPE @ 6700'. RIH TO 10136'. BREAK CIRC, REAM FOR LOG DATA F/10136'-10328', ANADRIL DOT TOOL FAILED. RIH TO 10865', BREAK CIRC. DRILL & SURVEY. ANADRIL DOT TOOL CAME ON AGAIN WHEN DRILLING STARTED. R C VED Oil & Gas Coas. Commission Anchora,cla WELL: 1H-13 API: 50-029-22356 PERMIT: 93-49 PAGE: 4 04/11/93 (14) PARKER 245 TD:ll172' ( 182) 04/12/93 (15) PARKER 245 TD:ll172' ( o) 04/13/93 (16) PARKER 245 TD:ll172' ( o) 04/14/93 (17) PARKER 245 TD:ll172' ( o) 06/20/93 (19) TD:ll172 PB:l1084 RIH W/5" LINER 7"@10138' MW:12.3 VIS: 48 DRILL & MWD SURVEY TO 11172'. CBU @ 11172'. SHORT TRIP TO 10138' NO TIGHT HOLE & NO FILL. CBU @ 11172', NO GAS OFF , BTM. POH. LD ANADRIL TOOLS. RIG TO RUN 5" 18# L-80 LINER W/TIW LINER HGR & LINER PKR. CIRC @ 1340'. RIH W/LINER SLOWLY, FILL PIPE EVERY 5 STDS & SLM. PU 2-7/8" BHA 5"@11170' MW: 12.3 VIS: 48 RIH W/5" LINER TO 7" SHOE. CIRC @ 10124' @ 3 BPM @ 1200 PSI. RIH TO 11150', MU CMT MANIFOLD, WASH F/11150'-11172' CIRC & COND MUD, BATCH MIX CMT. HALLIBURTON PMP 5 BBLS 13.3 PPG ARCO SPACER, TEST LINES TO 4000 PSI, THEN PMP 15 BBLS SPACER, FOLLOWED BY 130 SX (26.6 BBLS) 15.6 PPG SLURRY, CLEARED LINES, DROPPED PLUG & DISPLACED W/RIG PMP, BUMPED PLUG W/3500 PSI. RELEASE F/HGR, SET PKR & TEST TO' 1500 PSI, PULL OUT OF HGR. REVERSE OUT CMT SPACER, DID NOT SEE ANY CMT RETURNS. POH, LD LINER SETTING TOOL. SERVICE RIG. MU BHA, RIH, TAG TOP OF LINkR @ 9846'. CBU. POH, BREAK DOWN BIT & SCRAPER. RD TO LD 2-7/8" DP 5"@11170' MW:12.3 VIS: 0 RU & PU 2-7/8" BHA. RIH W/3-1/2" DP. SERVICE RIG. FIN RIH, TAG PLUG @ 11085'. CIRC. PMP 10 BBLS HI-VIS SWEEP, DISPLACE 12.3 PPG MUD W/12.3 PPG BRINE. TEST CSG-1700 PSI FOR 1/2 HR-GOOD TEST. MONITOR WELL, RIG BRINE TANK TO GRAVITY, FILL WELL WHILE PULLING OUT OF HOLE. PULLING & LAYING DOWN 3-1/2" DP, LD 315 JTS, RIGGING TO LD 2-7/8" DP @ REPORT TIME. RIG RELEASED 5"@11170' MW:12.3 VIS: 0 LD 2-7/8" DP, 5" CSG SCRAPER, & MILL. CHANGED BTM RAMS TO 5". ND & SET OUT BOP'S. PULLED WEAR BUSHING & NU TREE. CHANGE SAVER SUB. LD 3-1/2" DP & 4-3/4" DC'S IN MOUSE HOLE. RELEASED RIG @ 14:00 HRS 04/13/93. MOVED RIG FROM WELL # 1H-13 TO 1H-14. LOADING DP & PERF GUNS 5"@11170' MW:12.3 NaC1/Br MOVE RIG F/1H-14 TO 1H-13. ACCEPT RIG @ 0300 HRS, 06/20/93. ND DRY HOLE TREE, SET TEST PLUG. NU BOPS, CHOKE LINE, KILL LINE, MU FLOW RISER, LOAD PITS. FULL WEEKLY BOP TEST. WITNESS WAIVED BY JOHN SPAULDING OF AOGCC. COMMENCE LOADING 2-7/8" DP & PERF FUNS WHILE TESTING. WELL: 1H-13 API: 50-029-22356 PERMIT: 93-49 PAGE: 5 06/21/93 (20) TD:ll172 PB:11084 06/22/93 (21) TD:ll172 PB:l1084 06/23/93 (22) TD:11172 ?B:11084 POH W/TCP PERF GUNS 5"@11170' MW:12.3 NaCl/Br PULL BOP TEST PLUG & RU TO RUN SWS TCP GUNS. MU & RIH W/SWS 3-3/8" TCP GUNS. PU & RIH W/25 JTS OF 2-7/8" DP. RU TO RUN 3-1/2" DP. MU 2-7/8" X 3-1/2" CROSSOVER. RIH W/100 STDS OF 3-1/2" DP. PU & RIH W/3-1/2" DP SINGLES. RU SWS WL & RIH W/CORRELATION GR. CORRELATE RA SUBS TO CET LOG. POH. RD SWS, SPACE OUT W/PUP, SHOOT PERFS. PERF INTERVALS 10532'-10676', 10695'-10726', 10742'-10772', & 10884'-10982' W/SWS 3-3/8" TCP GUNS, 6 SPF, 60 DEG SPIRAL PHASING, NON-ORIENTED, LOADED W/41B HJ2 RDX CHARGES. MONITOR WELL-STABLE. CBU. MONITOR WELL-STABLE, FLUID LEVEL STATIC. RU TO LD DP. POH W/3-1/2" DP. LD FIRST 107 JTS, CURRENTLY STANDING BACK STANDS. RIH W/3-1/2" COMPLETION 5"@11170' MW:12.3 NaCl/Br POH & LD 25 JTS 2-7/8" DP. POH & LD SWS 3-3/8" TCP GUNS. SEND OUT GUNS, CLEAN UP DRILL FLOOR & PIPE SHED. RACK, DRIFT, INSTALL SEAL RINGS & TALLY 3-1/2" TBG. RIG TO RIH. SLIP & CUT DRLG LINE. CLEAN THREADS ON BTC TAILPIPE CONNECTIONS. MU & RIH 3L1/2'' COMPLETION ASSY. MU SSSV, TEST CONTROL LINE, CONT RIH, BANDING EVERY OTHER JT. RIG RELEASED 5"@11170' MW:12.3 NaCl/Br FIN RUNNING 3-1/2" COMP ASSY. MU CAMCO SSSV, ATTACH CONTROL LINE WITH 30 BANDS. MU FMC TBG HGR, TEST CONTROL LINE, LAND TBG. RILDS. RU OTIS SL. TEST LUB & RIH W/2.750" STANDING VALVE. SET STANDING VALVE IN D-NIPPLE @ 9770' POH W/SL. TEST SSSV W/1000 PSI BELOW, 500 PSI ABOVE. SET PKR W/2500 PSI ON TBG. TEST TBG FOR 15 MIN. BOLDS. PU & SHEAR PBR W/104K LBS. RILDS. PRESS TBG TO 2500 PSI TO TEST SEALS. PRESS TEST ANN & TBG TO 1000 PSI. BLEED OFF CONTROL LINE TO CLOSE SSSV. BLEED TBG TO 500 PSI FOR 15 MIN. REPRESS TBG TO 1000 PSI & OPEN SSSV. TEST ANN & TBG TO 2500 PSI. INCREASE TBG PRESS TO 3000 PSI. BLEED OFF PRESS. RIH W/RETRIEVING TOOL & PULL STANDING VALVE. POH & RD OTIS. SET BPV. ND BOP, NU TREE. TEST FLANGE TO 5000 PSI. PULL BPV, SET TEST TREE TEST PLUG & TEST TREE TO 5000 PSI. PULL TEST PUG, SET BPV. RU & DISPLACE ANN W/60 BBLS OF DIESEL @ 2200 PSI @ 1.5 BPM. BULLHEAD 20 BBLS DOWN TBG. DRESS TREE. SECURE WELL & CLOSE SSSV. RIG RELEASED @ 1700 HRS ON 06/22/93. SIGNATURE: DATE: RECEIVED ,/~,laska Oil & Gas Cons. ' - -'" Co~n~n~ss~on ,Anchorage SUB - S URFA CE DIRECTIONAL SURVEY r~-! UIDANCE ~'! ONTINUOUS J'~ OOL Company Well Name Field/Location ,~ ,a.~,-,~ ~, ~ ...,...¥.~.,-~.~ ARCO ALAS~m INC. .. , ]~-]3 (709' ~. 790' FEL. SEC 33~ T]2~. RIOE, ~) KUPARUK~ NORTH SLOPE, ALASKA Job Reference No. 93203 Loqaed By: FORNICA Date 27-APR-93 · SCHLL~BERGER * GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE: 27-APRIL-1993 ENGINEER' JEFF FORMICA METHODS OF COMPUTATION TOOL LOCATION: MINIMU~ CURVATURE INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH B$ DEG 8 MIN EAST COMPUTATION DATE- 11-MAY-93 PAGE I ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' 27-APRIL-199 KELLY BUSHING ELEVATION' 96.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOr EVEN 100 FEET Of MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 O0 0 O0 99 99 199 98 299 97 399 95 499 84 599 55 698 75 797 21 894 69 -96 O0 3 99 103 98 203 97 303 95 403 84 5O3 55 602 75 701 798 0 0 N 0 0 E 0 59 N 84 4 W 0 57 N 88 51 W 0 7 S 33 3W 2 2 N 85 26 E 3 17 N 89 39 E 5 4O S 81 48 E 8 47 S 78 20 E 21 11 16 S 78 41 E 69 14 58 S 80 55 E 0 O0 -0 74 -2 51 -3 40 -1 68 2 86 10 40 22 91 40 20 62 33 0 O0 1 O5 0 75 1 15 I 29 2 29 3 02 2 57 2 38 4 43 0 O0 N 0 21 N 026 N 0 24 N 0 32N 0 54 N 0 08S 239S 5 885 9 85S 0 O0 E 0 72 W 2 50 W 3 39 W 1 66 W 2 92 E 10 44 E 22 79 E 39 84 E 61 71E 0 O0 N 0 0 E 0 2 3 1 2 10 22 40 62 75 N 73 33 W 51 N 83 58 W 4O N 86 2 W 69 N 78 58 W 97 N 79 32 E 44 S 89 35 E 92 S 84 1E 27 S 81 37 E 49 S 8O 56 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 990.07 O0 1083.03 987 O0 1174.23 1078 O0 1263.21 1167 O0 1349.91 1253 O0 1434.06 1338 O0 1515.22 1419 O0 1594.90 1498 O0 1672.43 1576 O0 1746.52 1650 894 07 19 52 03 22 57 23 25 37 21 28 35 91 31 3 06 34 26 22 36 32 90 37 54 43 40 37 52 43 48 $ 83 51E 92.21 S 83 0 E 129.04 S 81 57 E 169.98 S 82 28 E 215.52 S 82 23 E 265.28 S 81 30 E 319.19 S 81 30 E 377.48 S 81 47 E 437.79 S 82 22 E 500.83 S 82 34 E 567.90 4 37 2 38 3 31 3 05 2 69 3 67 1 07 1 71 2 79 2 89 13.67 S 17.69 S 128 23.22 S 168 29.42 S 213 35.86 S 263 43.56 S 316 52.24 S 374 61.00 S 434 69.75 S 496 78.56 S 563 91 38 E O0 E 129 61E 170 8O E 215 19 E 265 64 E 319 39 E 378 18 E 438 70 E 501 27 E 568 92 40 S 81 29 E 21 S 82 8 E 2O S 82 9 E 81 S 82 10 E 62 S 82 14 E 62 S 82 10 E O2 S 82 3 E 44 S 82 0 E 57 S 82 0 E 72 S 82 4 E 2000 O0 1816.58 1720.58 47 15 2100 2200 2300 2400 2500 2600 2700 2800 2900 O0 1882 56 1786 56 50 15 O0 1944 O0 2002 O0 2060 O0 2119 O0 2176 O0 2232 O0 2290 O0 2346 28 1848 86 1906 77 1964 07 2023 36 2080 98 2136 41 2194 6O 2250 S 83 10 E S 82 58 E 714 28 53 18 S 83 24 E 792 86 54 38 S 83 25 E 873 77 54 27 S 83 34 E 955 07 54 20 S 83 39 E 1036 36 55 43 S 84 57 E 1118 98 55 9 S 85 2 E 1200 41 55 5 S 84 56 E 1282 60 56 15 S 84 46 E 1365 639 17 25 87 87 36 58 53 96 81 54 2 82 2 68 1 57 0 43 0 33 0 82 0 56 0 85 1 64 0 25 87.42 S 634 04 E 640 03 S 82 9 E 96.47 S 708 105.83 S 786 115.16 S 867 124.37 S 948 133.43 S 1028 141.63 S 1110 148.82 S 1192 155.95 S 1274 163.41S 1356 62 E 715 72 E 793 22 E 874 23 E 956 97 E 1037 51E 1119 63 E 1201 18 E 1283 56 E 1366 16 S 82 15 E 81 S 82 2O E 83 S 82 26 E 35 S 82 32 E 58 S 82 37 E 51 S 82 44 E 88 S 82 53 E 68 S 83 1E 37 S 83 8 E 3000 O0 2402 30 2306 30 55 54 3100 3200 3300 3400 350O 3600 37O0 3800 3900 O0 2458 O0 2514 O0 2571 O0 2627 O0 2683 O0 2740 O0 2797 O0 2854 O0 2910 56 2362 92 2418 05 2475 35 2531 93 2587 82 2644 86 2701 54 2758 09 2814 56 55 41 92 55 46 05 55 5O 35 55 38 93 55 25 82 55 14 86 55 18 54 55 35 09 57 1 S 84 3O E 1448 58 S 84 22 E 1531 S 85 25 E 1613 S 86 29 E 1696 S 86 24 E 1779 S 86 27 E 1861 S 86 25 E 1943 S 86 10 E 2025 S 85 55 E 2108 S 86 54 E 2191 25 85 6O 22 65 87 99 37 50 0 75 0 13 2 20 0 11 0 33 0 24 0 2O 0 40 0 75 0 79 171 15 S 1439 25 E 1449 39 S 83 13 E 179 186 192 197 202 207 213 218 224 29 S 1521 96 S 1603 46 S 1686 63 S 1768 77 S 1851 91S 1933 18 S 2015 93 S 2097 21S 2180 52 E 1532 77 E 1614 35 E 1697 83 E 1779 12 E 1862 2O E 1944 16 E 2026 35 E 2108 33 E 2191 05 S 83 17 E 63 S 83 21E 29 S 83 29 E 83 S 83 37 E 19 S 83 45 E 35 S 83 52 E 41 S 83 58 E 75 S 84 2 E 83 S 84 8 E COMPUTATION DATE' 11-MAY-93 PaGE 2 ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKa DATE OF SURVEY- 27-APRIL-199 KELLY BUSHING ELEVATION- 96.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 2964.56 2868 56 56 48 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 3019.58 2923 O0 3074.79 2978 O0 3130.05 3034 O0 3185 86 3089 O0 3242 56 3146 O0 3299 87 3203 O0 3357 67 3261 O0 3416 30 3320 O0 3474 63 3378 58 56 30 79 56 31 05 56 19 86 55 5O 56 55 12 87 54 58 67 54 15 30 54 21 63 54 6 S 86 43 E 2275 32 S 86 39 E 2358 S 86 36 E 2442 S 86 25 E 2525 S 86 22 E 2608 S 86 20 E 2690 S 86 14 E 2772 S 85 42 E 2854 S 84 35 E 2935 S 84 12 E 3016 79 14 46 42 77 70 30 30 52 0 26 0 36 0 18 0 38 0 45 0 53 0 44 1 62 1 O6 0 77 228 81 S 2264 07 E 2275 60 S 84 14 E 233 238 243 248 254 259 265 271 280 66 S 2347 52 S 2430 63 S 2513 87 S 2596 09 S 2678 40 S 2760 03 S 2842 90 S 2922 O0 S 3003 43 E 2359 67 E 2442 85 E 2525 67 E 2608 87 E 269O 65 E 2772 06 E 2854 77 E 2935 59 E 3016 O3 S 84 19 E 34 S 84 24 E 63 S 84 28 E 57 S 84 32 E 90 S 84 35 E 81 S 84 38 E 39 S 84 4O E 39 S 84 41 E 61 S 84 40 E 5000 O0 3533 79 3437.79 53 21 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 3593 O0 3652 O0 3711 O0 3771 O0 3831 O0 3891 O0 3949 O0 4006 O0 4064 37 3497.37 53 54 15 3556.15 53 52 37 3615.37 53 23 65 3675.65 52 36 68 3735.68 53 41 09 3795.09 53 47 04 3853.04 55 0 66 3910.66 54 42 55 3968.55 54 43 S 84 16 E 3097 13 S 83 55 E 3177 S 83 54 E 3258 S 84 5 E 3338 S 84 18 E 3418 S 86 14 E 3498 S 86 28 E 3579 S 86 41E 3660 S 86 20 E 3742 S 85 54 E 3823 43 31 87 65 62 O4 51 22 74 0 81 1 44 0 40 1 05 0 89 0 94 1 73 0 65 0 49 1 32 288 05 S 3083 81 E 3097.23 S 84 40 E 296 304 313 321 328 333 338 343 348 32 S 3163 92 S 3244 38 S 3324 49 S 3403 12 S 3483 27 S 3563 16 S 3644 08 S 3726 61S 3807 70 E 3177.54 S 84 39 E 14 E 3258.44 S 84 38 E 27 E 3339.01 S 84 37 E 65 E 3418 80 S 84 36 E 34 E 3498 76 S 84 37 E 61 E 3579 16 S 84 39 E 96 E 3660 61 S 84 42 E 54 E 3742 30 S 84 44 E 89 E 3823 82 S 84 46 E 6000 O0 4121.24 4025 24 56 4 6100 6200 6300 6400 6500 6600 6700 6800 6900 O0 4177.02 4081 O0 4232.83 4136 O0 4288.77 4192 O0 4345.21 4249 O0 4401.95 4305 O0 4459.45 4363 O0 4517.95 4421 O0 4577.61 4481 O0 4638.73 4542 02 56 6 83 56 77 55 54 21 55 31 95 55 14 45 54 3O 95 53 48 61 52 54 73 51 47 S 86 3 E 3906 S 86 16 E 3989 S 86 8 E 4O72 S 85 4O E 4154 S 84 52 E 4237 S 84 47 E 4319 S 85 0 E 4401 S 85 35 E 4482 S 86 10 E 4562 S 86 46 E 4642 10 06 94 49 83 64 74 99 11 0 . 74 0.23 0.11 0.96 0.24 O. 90 0.42 1.01 1.10 1.09 354.50 S 3890 06 E 3906 18 S 84 48 E 360.04 S 3972 365.55 S 4055 371.41S 4138 378 32 S 4220 385 79 S 43O2 393 2O S 4384 399 89 S 4464 405 68 S 4544 410 56 S 4623 88 E 3989 67 E 4072 35 E 4154 61E 4237 61E 4319 O9 E 4401 91E 4482 96 E 4563 95 E 4642 16 S 84 49 E 11 S 84 51 E 98 S 84 52 E 53 S 84 53 E 87 S 84 53 E 69 S 84 52 E 79 S 84 53 E 03 S 84 54 E 14 S 84 56 E 7000 O0 4701 24 4605.24 51 2 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 4763 O0 4825 O0 4887 O0 4947 O0 5007 O0 5067 O0 5128 O0 5186 O0 5242 58 4667.58 51 49 09 4729.09 51 52 23 4791.23 51 46 85 4851.85 53 17 57 4911.57 53 5 99 4971.99 52 29 68 5032.68 53 42 63 5090.63 55 48 82 5146.82 55 30 S 87 26 E 4720 12 S 86 12 E 4798 S 86 6 E 4877 S 86 2O E 4955 S 85 45 E 5034 S 85 36 E 5115 S 85 52 E 5194 S 86 4 E 5274 S 86 15 E 5355 S 86 16 E 5438 28 11 44 96 16 84 31 79 49 0 92 0 86 1 23 2 60 1 36 0 59 0 60 3 84 2 13 0 79 414 43 S 4701 91 E 4720 14 S 84 58 E 418 424 429 434 441 447 452 458 463 84 S 4779 32 S 4858 41S 4936 95 S 5016 07 S 5096 04 S 5175 75 S 5254 2O S 5336 62 S 5418 97 e 4798 63 E 4877 81E 4955 14 E 5034 11E 5115 58 E 5194 85 E 5274 16 E 5355 29 S 85 0 E 12 S 85 1E 45 S 85 2 E 96 S 85 3 E 17 S 85 3 E 85 S 85 4 E 31 S 85 5 E 79 S 85 6 E 69 E 5438.49 S 85 7 E COMPUTATION DATE' 11-MAY-g3 PAGE 3 ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' 27-APRIL-199 KELLY BUSHING ELEVATION' 96.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 5299 80 5203.80 55 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 5356 O0 5411 O0 5469 O0 5528 O0 5588 O0 5648 O0 5705 O0 5761 O0 5815.56 5719 23 5260.23 56 35 96 5315.96 55 30 44 5373.44 54 26 29 5432 29 53 25 62 5492 62 52 30 35 5552 35 53 54 74 5609 74 55 45 15 5665 15 56 46 56 57 33 S 86 8 E 5520.66 S 86 32 E 5603.19 S 86 52 E 5686.19 S 87 18 E 5767.97 S 87 29 E 5848.75 S 87 43 E 5928.43 S 86 47 E 6008.57 S 85 57 E 6090.44 S 85 54 E 6173.68 S 86 20 E 6257.57 0 58 0 79 1 29 0 79 1 10 1 85 2 38 2 15 1 67 1 90 469 04 S 5500 70 E 5520 66 S 85 8 E 474 42 S 5583 479 22 S 5665 483 38 S 5747 487 09 S 5828 490 38 S 5908 494 24 S 5988 499 65 S 6069 505.83 S 6152 511.49 S 6236 07 E 5603 96 E 5686 68 E 5767 44 E 5848 13 E 5928 23 E 6008 93 E 6090 95 E 6173 66 E 6257 19 S 85 9 E 19 S 85 10 E 97 S 85 12 E 76 S 85 13 E 45 S 85 15 E 59 S 85 17 E 46 S 85 18 E 71 S 85 18 E 60 S 85 19 E 9000 O0 5869 13 5773 13 57 20 9100 9200 9300 9400 9500 9600 9700 9800 9900 O0 5923 O0 5978 O0 6032 O0 6086 O0 6141 O0 6196 O0 6250 O0 6304 O0 6356 63 5827 64 5882 75 5936 87 5990 89 6045 72 6100 35 6154 29 6208 63 56 36 64 57 7 75 57 28 87 56 51 89 56 19 72 57 17 35 57 41 29 57 28 48 6260.48 59 12 S 85 57 E 6342 O0 S 86 18 E 6425 S 86 17 E 65O9 S 86 18 E 6593 S 86 41E 6677 S 87 13 E 6760 S 87 23 E 6844 S 86 51E 6928 S 87 11E 7013 S 86 26 E 7098 83 32 40 47 93 49 84 O0 25 0 67 1 10 0 43 0 47 0 85 1 33 0 56 0 63 1 98 2 91 517.33 S 6320 90 E 6342 04 S 85 19 E 523.06 S 6404 528.43 S 6487 533.89 S 6571 539 17 S 6655 543 70 S 6739 547 55 S 6822 551 77 S 6906 556 09 S 6991 560 62 S 7076 55 E 6425 88 E 6509 80 E 6593 72 E 6677 10 E 6761 64 E 6844 94 E 6928 03 E 7013 20 E 7098 87 S 85 20 E 37 S 85 21E 45 S 85 21E 53 S 85 22 E O0 S 85 23 E 58 S 85 25 E 94 S 85 26 E 11 S 85 27 E 38 S 85 28 E 10000 O0 6405 31 6309.31 62 25 10100 10200 10300 10400 10500 10600 10700 10800 10900 O0 6448 O0 6486 O0 6521 O0 6555 O0 6588 O0 6623 O0 6657 O0 6691 O0 6725 64 6352.64 66 19 48 6390.48 68 29 70 6425.70 69 48 52 6459 52 70 47 73 6492 73 70 27 23 6527 23 69 19 86 6561 86 70 2 91 6595 91 70 9 70 6629 70 70 24 S 84 31E 7185 50 S 84 18 E 7275 S 84 45 E 7368 S 85 52 E 7461 S 86 28 E 7555 N 87 27 E 7649 S 89 30 E 7743 S 88 26 E 7836 S 86 23 E 7930 S 85 9 E 8024 58 13 72 80 73 09 70 64 73 3 69 4 O1 1 57 0 91 0 02 3 91 3 24 1 29 1 78 1 20 567 66 S 7163.17 E 7185.62 S 85 28 E 576 585 593 599 599 598 600 604 611 83 S 7252.80 E 7275.70 S 85 27 E 88 S 7344.91 E 7368.24 S 85 26 E 48 S 7438 19 E 7461.83 S 85 26 E 69 S 7532 08 E 7555.92 S 85 27 E 71 S 7626 35 E 7649.90 S 85 30 E 17 S 7720 18 E 7743.32 S 85 34 E 33 S 7813 95 E 7836.97 S 85 36 E 67 S 7907 86 E 7930.94 S 85 38 E 15 S 8001 73 E 8025.04 S 85 38 E 11000.00 6759.11 6663.11 70 32 11100.00 6792.41 6696.41 70 35 11172.00 6816.34 6720.34 70 36 S 84 9 E 8118.96 S 82 59 E 8213.22 S 82 49 E 8281.08 0.50 0.07 O. O0 620.47 S 8095.51 E 8119.25 S 85 37 E 630.57 S 8189.26 E 8213.50 S 85 36 E 638.82 S 8256.66 E 8281.33 S 85 35 E COMPUTATION DATE: Il-MAY-93 PAGE 4 ARCO ALASKA, INC. 1h-i3 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 27-APRIL-199 KELLY BUSHING ELEVATION: 96.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG BIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES hORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 90OO 0 O0 O0 990 O0 1816 O0 2402 O0 2964 O0 3533 O0 4121 O0 4701 O0 5299 O0 5869 -96 O0 07 894 58 1720 30 2306 56 2868 79 3437 24 4025 24 4605 80 5203 13 5773 0 0 07 19 52 58 47 15 3O 55 54 56 56 48 79 53 21 24 56 4 24 51 2 80 55 13 57 20 N 0 0 E S 83 51E 92 S 83 10 E 639 S 84 30 E 1448 S 86 43 E 2275 S 84 16 E 3097 S 86 3 E 3906 S 87 26 E 4720 S 86 8 E 5520 S 85 57 E 6342 0 O0 21 17 58 32 13 11 12 66 O0 0 O0 4 37 2 82 0 75 0 26 0 81 0 74 0 92 0 58 0 67 0 O0 N 13 87 171 228 288 354 414 469 517 0 O0 E 67 S 91 42 S 634 1S S 1439 81S 2264 05 S 3083 50 S 3890 43 S 4701 04 S 5500 33 S 6320 0 O0 N 0 0 E 38 E 92 04 E 640 25 E~1449 07 E 2275 81E 3097 06 E 3906 91E 4720 70 E 5520 90 E 6342 40 S 81 29 E 03 S 82 9 E 39 S 83 13 E 60 S 84 14 E 23 S 84 40 E 18 S 84 48 E 14 S 84 58 E 66 S 85 8 E O4 S 85 19 E 10000.00 6405.31 6309.31 62 25 11000.00 6759.11 6663.11 70 32 11172.00 6816.34 6720.34 70 36 S 84 31 E 7185.50 S 84 9 E 8118,96 S 82 49 E 8281.08 3.69 0.50 0.00 567.66 S 7163.17 E 7185.62 S 85 28 E 620.47 S 8095.51 E 8119.25 S 85 37 E 638.82 S 8256.66 E 8281.33 S 85 35 E COMPUTATION DATE- 11-MAY-93 PAGE $ ARCO AL&SKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA DATE Of SURVEY' 2T-APRIL-199 KELLY BUSHING ELEVATION' 96.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 96 O0 196 02 296 03 396 05 496 15 596 43 697 22 798 77 901 36 0 O0 96 O0 196 O0 296 O0 396 O0 496 O0 596 O0 696 O0 796 O0 896 O0 -96.00 0.00 100.00 200.00 300 O0 400 O0 500 O0 600 O0 700 800 0 0 N 0 0 E 0 58 N 82 22 W 0 59 N 88 56 W 0 9 S 51 49 W I 59 N 85 27 E 3 13 N 89 2O E 5 33 S 82 2 E 8 42 S 78 21 E O0 11 14 S 78 40 E O0 15 1 S 80 57 E O. O0 -0.67 -2.45 -3.39 -1.82 2.65 10.05 '22.49 39.96 ' 62.67 0 O0 1 22 0 49 I 11 I 20 1 91 3 07 2 47 2 51 4 39 0 O0 N 0 21N 0 26 N 0 24 N 0 31 N 054 N 0 02S 2 30S 5 83S 9 91 S 0.00 E 0 65 W 2 43 W 3 39 W 1 80 W 2 71E 10 09 E 22 37 E 39 61E 62 O5 E 0 O0 N 0 0 E 0 2 3 1 2 10 22 40 62 68 N 72 30 W 45 N 83 50 W 39 N 85 56 W 82 N 8O 8 W 76 N 78 47 E 09 S 89 52 E 49 S 84 8 E 03 S 81 38 E 84 S 80 56 E 1006 31 1114 1224 1337 1454 1576 1TO1 1831 1969 2121 996 O0 11 1096 21 1196 53 1296 32 1396 12 1496 40 1596 26 1696 97 1796 21 1896 900 O0 20 7 O0 1000 O0 1100 O0 1200 O0 1300 O0 1400 O0 1500 O0 1600 O0 1700 O0 1800 S 83 55 E O0 23 16 S 82 43 E O0 26 24 S 82 4 E O0 29 40 S 82 39 E O0 32 49 S 81 43 E O0 36 16 S 81 26 E O0 37 55 S 81 47 E O0 41 32 S 82 27 E O0 46 14 S 83 1E O0 50 57 S 83 1E 94 39 134 59 180 55 233 74 293 98 363 34 438 64 521 34 617 31 730 64 4 06 2 37 3 32 2 60 3 50 1 05 1 74 3 18 4 O0 3 42 13 90 S 18 24 31 39 5O 61 72 84 98 93 55 E 39 S 133 70 S 179 78 S 231 86 S 291 14 S 360 12 S 435 47 S 517 79 S 612 47 S 724 94 57 S 81 33 E 51E 134 10 E 180 88 E 234 65 E 294 38 E 363 03 E 439 05 E 522 33 E 618 90 E 731 77 S 82 9 E 80 S 82 9 E 05 S 82 12 E 36 S 82 13 E 85 S 82 5 E 30 S 82 0 E 11 S 82 1E 17 S 82 7 E 56 S 82 16 E 2288.14 1996 O0 1900 O0 54 36 2460.47 2096 2634.84 2196 2809.79 2296 2988.76 2396 3166.40 2496 3344.39 2596 3521.26 2696 3696.72 2796 3874.22 2896 O0 2000 O0 2100 O0 2200 O0 2300 O0 2400 O0 2500 O0 2600 O0 2700 O0 2800 O0 54 17 O0 55 40 O0 55 14 O0 55 58 O0 55 41 O0 55 45 O0 55 23 O0 55 17 O0 56 43 S 83 23 E S 83 36 E 1004 S 85 1E 1147 S 84 54 E 1290 S 84 33 E 1439 S 84 42 E 1586 S 86 25 E 1733 S 86 27 E 1879 S 86 11E 2023 S 86 41E 2169 864 20 49 31 86 27 O9 30 15 29 91 0 48 0 29 0 44 1 87 0 74 1 0 0 0 2 26 31 33 39 18 114 05 S 857 62 E 865 17 S 82 25 E 129 144 156 170 184 194 203 213 223 86 S 997 15 S 1139 66 S 1282 26 S 1429 58 S 1576 74 S 1722 86 S 1868 O0 S 2012 O0 S 2158 O7 E 1005 18 E 1148 19 E 1291 98 E 1440 11E 1586 99 E 1733 59 E 1879 48 E 2023 77 E 2170 49 S 82 35 E 27 S 82 47 E 72 S 83 2 E 08 S 83 13 E 88 S 83 19 E 96 S 83 33 E 67 S 83 46 E 72 S 83 57 E 26 S 84 6 E 4057 25 2996 O0 2900 O0 56 34 4238 4418 4593 4765 4936 5104 5274 5440 5608 44 3096 01 3196 26 3296 29 3396 32 3496 48 3596 16 3696 21 3796 31 3896 O0 3000 O0 3100 O0 3200 O0 3300 O0 3400 O0 3500 O0 3600 O0 3700 O0 3800 O0 56 30 O0 55 41 O0 54 59 O0 54 4 O0 53 50 O0 53 56 O0 53 36 O0 52 57 O0 53 56 S 86 41E 2323 15 S 86 31E 2474 S 86 23 E 2623 S 86 15 E 2767 S 84 58 E 29O7 S 84 18 E 3045 S 83 55 E 3181 S 84 1E 3318 S 84 59 E 3450 S 86 29 E 3585 19 30 19 15 88 O5 10 65 74 0 56 0 26 0 93 0 35 1 28 0 74 1 25 0 69 3 18 1 99 231.58 S 2311 84 E 2323 41 S 84 17 E 240.45 S 2462 249.81S 2611 259 04 S 2755 269 34 S 2894 282 94 S 3032 296 7O S 3167 311 22 S 3303 324 52 S 3435 333 69 S 3570 66 E 2474 52 E 2623 14 E 2767 73 E 2907 80 E 3045 30 E 3181 61E 3318 50 E 3450 30 E 3585 38 S 84 25 E 44 S 84 32 E 29 S 84 38 E 23 S 84 41E 97 S 84 40 E 17 S 84 39 E 24 S 84 37 E 79 S 84 36 E 86 S 84 4O E COMPUTATION DATE: Il-MAY-93 PAGE 6 ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA DATE Of SURVEY' 27-APRIL-199 KELLY BUSHING ELEVATION' 96.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG BIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 5781 SS 3996 O0 3900.00 54 45 5955 6134 6312 6489 6662 6830 6991 7152 7314 01 4096 04 4196 88 4296 57 4396 69 4496 37 4596 67 4696 69 4796 22 4896 O0 4000 O0 55 36 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 O0 4700 O0 4800 O0 56 6 O0 55 50 O0 55 18 O0 54 8 O0 52 33 O0 51 0 O0 52 13 O0 52 10 S 86 26 E 3727 16 S 85 51E 3868 S 86 13 E 4017 S 85 32 E 4165 S 84 48 E 4311 S 85 20 E 4452 S 86 23 E 4587 S 87 28 E 4713 S 85 55 E 4839 S 86 14 E 4966 88 34 60 26 57 15 64 81 63 0 83 1 71 0 22 1 16 I 14 1 01 ! 53 0 64 0 04 3 15 342.12 S 3711.51 E 3727 25 S 84 44 351.87 S 3852 91 E 3868 361.89 S 4001 372.23 S 4148 385.01S 4294 397.49 S 4434 407.25 S 4569 414.14 S 4695 421.71S 4821 430.13 S 4947 07 E 4017 98 E 4165 08 E 4311 84 E 4452 08 E 4587 43 E 4713 41E 4839 98 E 4966 95 S 84 47 40 S 84 5O 65 S 84 52 31 S 84 53 62 S 84 53 19 S 84 54 66 S 84 58 82 S 85 0 64 S 85 2 7480 71 4996 O0 4900 O0 53 13 7645 7816 7993 8171 8345 8512 8682 8863 9049 89 5096 71 5196 37 5296 70 5396 44 5496 16 5596 76 5696 86 5796 52 5896 O0 5000 O0 5100 O0 5200 O0 5300 O0 5400 O0 5500 O0 5600 O0 5700 O0 5800 O0 52 17 O0 55 58 O0 55 3 O0 55 52 O0 54 1 O0 52 38 O0 55 30 O0 56 58 O0 56 59 S 85 36 E 5099 73 S 85 54 E 5231 19 S 86 15 E 5369 62 S 86 8 E 5515 22 S 86 46 E 5662 S 87 22 E 5804 S 87 38 E 5938 S 85 59 E 6076 S 86 11E 6227 S 86 4 E 6383 83 81 09 22 19 59 0 91 0 24 0 53 0 73 1 38 1 18 2 29 1 O9 0 52 0 53 439 89 S 5080 73 E 5099 74 S 85 3 E 449 459 468 477 485 490 498 5O9 520 67 S 5211 10 S 5349 67 S 5495 92 S 5642 09 S 5784 78 S 5917 65 S 6055 52 S 6206 24 S 6362 83 E 5231 96 E 5369 27 E 5515 63 E 5662 51E 5804 79 E 5938 75 E 6O76 34 E 6227 39 E 6383 19 S 85 4 E 62 S 85 6 E 22 S 85 8 E 83 S 85 10 E 82 S 85 12 E 10 S 85 16 E 24 S 85 18 E 22 S 85 18 E 62 S 85 2O E 9231 98 5996 O0 5900 O0 57 6 9416 9598 9784 9980 10226 10521 10812 11110 11172 67 6096 68 6196 65 6296 10 6396 22 6496 14 6596 02 6696 78 6796 O0 6816 O0 6000 O0 6100 O0 6200 O0 6300 O0 6400 O0 65OO O0 6600 O0 6700 34 6720 O0 56 45 O0 57 17 O0 57 11 O0 61 45 O0 68 59 O0 70 5 O0 70 10 O0 70 36 34 70 36 S 86 16 E 6536 17 S 86 42 E 6691 S 87 23 E 6843 S 87 14 E 7000 S 84 51E 7167 S 85 0 E 7392 N 88 14 E 7669 S 86 8 E 7941 S 82 52 E 8223 S 82 49 E 8281 42 38 O8 91 56 47 93 39 08 0 69 0 54 0 55 1 96 3 2 3 1 0 0 69 83 91 84 02 O0 530 18 S 6514 68 E 6536 22 S 85 21 E 539 547 555 566 588 599 605 631 638 98 S 6669 50 S 6821 46 S 6978 02 S 7145 07 S 7369 24 S 7646 19 S 7919 66 S 8199 82 S 8256 65 E 6691 53 E 6843 12 E 7000 66 E 7168 24 E 7392 2O E 7669 14 E 7942 36 E 8223 66 E 8281 47 S 85 22 E 46 S 85 25 E 19 S 85 27 E 04 S 85 28 E 67 S 85 26 E 64 S 85 31E 23 S 85 38 E 66 S 85 36 E 33 S 85 35 E COMPUTATION DATE: Il-MAY-93 PAGE 7 ARCO ALASKA, INC. 1H-13 KUPARUK RIVER NORTH SLOPE, ALASKA ~ARKER 9 $/8" CASING 7" CASING GCT LAST READING TOP KUPARUK C PBTD MWD LAST READING 5" LINER BOTTOM DATE OF SURVEY: 2T-APRIL-199 KELLY BUSHING ELEVATION: 96.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 709' FNL & 790' FEL, SEC33 T12N RIOE MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 6488.00 4395.10 10139.00 6463.83 10399.60 6555.39 10539.00 6602.14 11084.00 6787.08 11115.40 6797.54 11171.00 6816.01 11172.00 6816.34 4299 10 6367 83 6459 39 6506 14 6691 08 6701 54 6720 O1 6720 34 384 90 S 580 41S 599 69 S 598 84 S 628 95 S 632 13 S 638 7O S 638 82 S 4292.80 E 7288.54 E 7531.71E 7662.96 E 8174.26 E 8203.69 E 8255.72 E 8256.66 E ARCO ALASKA, INC. 1H-A3 KUPARUK RIVER NORTH SLOPE, ALASKA COMPUTATION DATE: 11-MAY-93 PaGE 8 DATE OF SURVEY: 27-APRIL-199 KELLY BUSHING ELEVATION: 96.00 FT ENGINEER: JEFF FORMICA ************ STRATIGRAPHIC SUMMARY ************ MARKER TOP KUPARUK C PBTD TD SURFACE LOCATION = 709' FNL ~ 790' FEL, SEC33 T12N RlOE MEASURED DEPTH TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 10539.00 6602.14 6506.14 598.84 S 7662.96 E 11084.00 6787.08 6691.08 628.95 S 8174.26 E 11172.00 6816.34 6720.34 638.82 S 8256.66 E FINAL WELL LOCATION AT TO: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMLFFH FEET DEG 11172.00 6816.34 6720.34 8281.33 S 85 35 E DIRECTIONAL SURVEY COMPANY FIELD ARCO ALASKA, INC. KUPARUK RIVER WELL 1H-1 3 COUNTRY USA RUN ONE DATE LOGGED 25 - APR - 93 DEPTH UNIT FEET REFERENCE 93203 All interpretations ara opinions based on Inferences from electrical or other measurements and we cannot, and do not guarantee the accuracy or correctness of any interpretations, and we shalt not. except in the case of gross or wlffull negligence on our part, be liable or responsible for any loss, costs, damages or expenses Incurred or sustained by anyone resulting from any Interpretation made by any of our offtcem, agents or employees, These interpretations are also subject to our General Terms and Conditions as set out In our current price Schedule. WELL: 'IH- 13~ (709' FNL, 790' FEL, SEC 33, T12N, RIOE) HORIZONTAL PROdECTION NORTH 8000 REF 93203 6O00 4OOO 200O -2000 -4000 -6000 SOUTH -8000 -4000 -2000 0 2000 SCALE = I / 2000 IN/FT :.:: .::: :::. :.:::::: :::; :::: ::;:,;::: .::: :;:: .:.: ....................................... :: ..:. :::. :::: ::. ::. :::: :. :.:: ., ...... . . . 4000 6000 8000 10000 12000 WEST EAST WELL: ~IH- 13~ (709' FNL, 790' FEL, SEC 33, T12N, RIOE) VERTICAL PROJECTION 27500 -4000 -2000 0 0 2000 4000 6000 8000 10000 12000 i!!!!!!!)! !.*?*!.!- !!!! ~(.!!i*!!!.!;!.!! ........ ilil ii. li .i..i.i..i i...L.L.i..i.i~2:~oi ii i...iiii.: ill ii! i ..i! i !.:: ; ~ii~ iil...i.~.ii..~i .i.i...}..i',i.:.}.i } ii,} :::~ .... .~ : i. i ,..i..! i ~...i.--i..-i-i -..i-.!.-i~--?-.i i.~ ..... !-!!.-. ! ....... !..!-; ;..i..~ 7°0o i. ! ..; ....... :::.:: ...... :: :..:, i.~ : : i :il;~ il !i : i':: ' · . ~ : i i.i .... : !.i~l~ i i i.i : i : : ~ . ; i i i : , : ~ : : i : , : ....... .... ;.;:;,;; ....... ;... · : ~ .... ! i.! ....... !.: ........ ! ...... i...! .... i-.!...!.i !..~..! ~ ...... i.!-!-..!-.r ~..~.~ r-~ .... ~ ...... ! . ........... .... .::: .:.. , · !-;-~-.!. !:!. ;;:. ;!!..,~;';! ;..~ !.i!!.;! ................ · : .::: :: ......... : :~ .:~ : ........... --: .:~ ~: ; . .., :~:: .... ~.::, :;~ :~': · , : .............. .:. .: ::.:...::.: ;.:.:.: :.:...: : .... ::: ..... ::.:: : ..................................... : : : . : ~ [ ~ ~ : : ~ ~.[ ~. ~ ~ . : .~ ~ :.. ~ ~ . ~ ~ ~ : ~ . ~ ~ . . ~ ~ ; : · ~ . ,.::~ ::.: ~. ;' ::; :: : '. ; ;:;~. . · . :.:. ::~ ,:: :::: :.:: :.:. .:~. . : : ::: .::. ::: ,:..: : . . : . . : . : : : · : ~ : ~ : . .::: ~: : :::: ::::):.~:. ................................ ~.~ ~:~.,~ ..... ~...~.;.; ..... ;...;...i.;. .;..i.~ ~ '~;i ;.~; ;;,~ ,~;~.~;~ ;;;; ......... :, ,, ...................... : .. : ::: :: .... : . : .: .:.: ::;: :::: :::. :::: :::: :.:. ~: ~ ~.~..~::.~ ~ : :: . . ~ ~ ; : ; ~'~'~ ~ ~'~"'~'~' "F'F'~*'~ ~"~'~'~";'F'~ ; ~ ;'~ ~ ~ '; ~ ~ ;' '~ ~ ~ ~ : ~ : ~ ;';'~ ; ~ : : ;" ~ ~ :'~ * ' : : ' : ~ ' ~ ' ........ ;..;.: ...... ]..~...;..; ..... ~.; ....... :.. :...;..; ......... ;~..:..: :..: ...... , ........... : ............ ;...: .... ............ : ............ gs,00 PROJECTION ON VIERTICAL PLANE 27S.00 gs.00 ,~:~ALED IN VERTICAL DEPTH8 HORIZ SCALE = I / 2000 IN/FT ARCO Alaska, Inc. Date' May 21, 1993 Transmittal #: 8743 RETURN TO: ARCO Alaska, inc. Attn: Nikki Stiller Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3W-07 (Palm) Sub-Surface Directional Survey Sub-Surface Directional Survey Sub-Surface Directional Survey 4-27-93 4-27-93 3-28-93 Receipt Acknowledged' DISTRIBUTION; Date' D&M State of Alaska (2 copies) 93203 93202 ARCO Alaska, Inc. Date: May 07, 1993 Transmittal #: 8713 RETURN TO: ARCO Alaska, Inc. ATTN: Nikki Stiller Kuparuk Operations File Clerk .ATO- 1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the followir~g ~items. ~'eceipt and return one signed copy of tt~is-t~a~'ml~al. Cement EvalUation Log Cement Bond Log Cement Evaluation Log Cement Bond Log Cement Evaluation Log Cement Bond Log 4-26-93 4-26-93 4-27-93 4-27-93 4-25-93 4-25-93 Date: Receipt Acknowledge: Drilling State of Alaska(+sepia) Please acknowledge 6100-8195 6100-8174 7600-10285 7600-10264 8500-11083 8500-11 .Q,59 NSK MEMORANDUM ALASKA OIL AND GAS CONSERVATION COMMISSION to: David W Jj~stb'~ date: Chairmar~ file: thru: Blair E Wondzell ,e'~~ subject: Sr Petr Engineer from:~L~o~u Grimaldi Petr Inspector STATE OF ALASKA April 8, 1993 040193-2.doc Rig/BOPE inspection Parker Rig #245 ARCO well 1 H-13 Kuparuk River field PTD 93-49 Thursday, April 1, 1993: I travelled to the Parker's Rig #245 in the Kuparuk River Field to make a rig/BOPE inspection. I found the rig to be in good shape with all well control equipment in place and operating. Parker Rig 245 is a well maintained rig which exhibits proper maintenance of its equipment. The company rep and toolpushers have always welcomed our visits, and are receptive to our comments. The area surrounding the rig was clean and orderly providing for good access. Summary: I made a rig/BOPE inspection on Parker's Rig #245 which revealed all to be incompliance. attachment ...-... STATE OF ALASKA ALASKA C ND GAS CONSERVATION COMMISSION I-.'uG / BPS INSPECTION REPORT OPERATION: Drilling '~' "Work6ver I ii Comp[' ....... Ulc II DATE: ~//--,/'"" ~,..~ ' ' 'Well Nome: /-/"/""'/,,~ .... PT'D# Locotio,: ...... S~a'~,tJon~ T. /m?..':U R. ,/'~,'¢~'. M,":L.,):' ..... , , ., ;"-:¢'<;:;1' ' (A.) B.0.P. STACK ..... ?ES NO N/'A ;ii;i!;; ' (C.)'M(jD S'Y,~:f:EM YES. NO N.!..A i:iii: Wellhead fig wkg press )( ' ;:~;:! Pit level floots instolled ' i3';JAnnulor p~eventer~' . . . . :S!i','jMud g~s sep~rotor ... :5,.Blind re, ms ., /%' .. : ;:~::=..:~. Se_ ..parat°r ....... bypos~ ':i'6!:i; Sled* 8nd-~ored .... ,)( :;3.~; Ge.s ~ensors ,~: . : · .. /??;.Chke/1.;ill line si~e ~- ' ;~:~'i Clicke line conne-dions ~' .... i81;iAli turns targeted ( Chke & kill Ln.) ~ i':'~; Trip i0nk' ' ~::9'; :HCP. ,,,'elves (chke & kill Ln.) /~ - ?:i.'; ~:i:,?i~'S~EEi'iO~i: !?'EM~ ~; ~: ,i:,,, ?, 'i~.C~MIbLiANCE': "' ,,, .' _;~;: ,'; ;::'" ':~' L ' ' :: "' : ' ' ,,' ," ~'" ' '. '" .... ''.) .' - ,_ _ (D:)BI.6 FLOOR YESNO N/A 1J Connectior~s (F!gd, Whd, Cl~,mped ',,~ . . : 37:.=__~.. Kelly cocks (upper, lewer,)BC~P) ~ _ .ii;~i Drilling spool, ' . X,. ;{].8.; Floor v~lves (dort b~ll, est.) ..~ ........... ~ .~.~-~- .......... .:!..~:. Flow NiPple ..... ~" i.~:9; I<.e.!ly & floor volvo wrenches .... ~ Flow monitor X" ~;.~di: Drillers con~5ie (flow monitor, ~: 1'~i 'C°n~.roi lines fire protected ,K"' ' ..... fl°w r~te indicotor, pit level ....... indicator.s, g?ges) ..... :1 UNIT YES NO I',,I/A '~11Kill ~heetup-to-dote ~i !: (B CLOSING ....... . kC' i-~'i Wo,'king pressure ___~ ':~i~ Ge.s deteSi'~n' monilore ..... "~7. F-i~J' i,e,v.,9. I ~ '¢' -: (t-t2S & ,'netho. ne).. . ... :].8-J Operating pressure _ ,kY ?~.~: .HYdre~ulic choke p~.nel , .. :; 4 Chokemenifold ;i9:Pressure gouges ~ ]~ Suffic_!~,:,!ve~i.,,,e~ '.ii '. '. t(" ~:i':'.~-i:?;:ii'~l~PEOtlO~.;itE~J.;:;?!iiii ii IN: COi,~PUANCE'- ~ ~ .. b . L::: 2' ': ' : ,' "': ...... _ .'~ _': ~ ,? , ~ ~ , i '" .... ' .......... 21 i Regul~torbyposs ~( ,.. (,E.) MISC. EQUIPMENT YES NO N/A 29 Blind rems he. ndle cover 7(" 'i~:~i. A!~'turn.s tet,.gei~d' _ ' _ _" .'. ,kc',' .:~i;[!riii.e!'C0ntr°l'~¢:..nei '.' ,,: X '" (downCreBrn choke lines' '( _ ) , :25! Remote coqJrol p~nel A'~_ : '.4. i,~ Reserve pit tonkoge . X . 16;',Z'! pro ed ve 'x' _ :~! N,t~sge~ poi,~ier soUrCe (beCkU) zk/. 2i§' All Drillsile Superv, sors Treined .. . , ..... P , · ....... ,:_21~: j Condition (le~ks, hoses, oct) S/ For Piocedures .. -.~4 m", \ . /._.~, ... -5.],: Ric,1 housekeepincj ....... A"., RECORDS: Dote of Lost Rig / BPS Inspection "-' De~te of Lost BOP Test ?'_ '"'/"' Resulling Non-Cornplionce Items: Nun-Compliemce not correcled & Reeson: Dote Corrections Will Be Compleled: '-----' BOP Tesl & Results Properly Ente,e~Record? )/':R'_....~S Kill Sheet Cu,rent? c- Open/Rig OPEP~TOR REP: c - Dalab8se E: - Tljp Rpt File FI-022.XLT (Rev. 12/'92) C-Inspedor ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 March 24, 1993 A W McBride Area Drilling Engineer ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit 1H-13 ARCO Alaska, Inc. Permit No. 93-49 Surf Loc 709'FNL, 790'FEL, Sec 33, T12N, R10E, UM Btmhole Loc 1428'FNL, 2366'FWL, Sec 35, T12N, R10E, UM Dear Mr McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling oPerations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing Shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W Joh~on ~ · Chairman BY ORDER OF THE COMMISSION jo/encl c:. Dept of' Fish & Game, Habitat Section, w/o encl Dept of Environmental Conservation w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSIO. , PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill r"] lb Type of Well Exploratory E] Stratigraphic Test [] Development Oil X Re-Entry [-1 Deepen E] Service [--] Development Gas E] Single Zone X Multiple Zone r'] 2.. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 96', Pad 54' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchoracje, AK 99510-0360 ADL 25638, ALK 463 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 709' FNL,790' FEL, Sec. 33, T12N, R10E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 1,350' FNL, 1,450' FWL, Sec. 35, T12N, R10E, UM 1H-13 #UG630610 At total depth 9. Approximate spud date Amount 1,428' FNL, 2,366' FWL, Sec. 35, T12N, R10E, UM 3/27/93 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 1 H-09 11,266' MD 2,366' @ TD feet 29' @ 240' MD feet 2,560 6,743' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 300' feet Maximum hole angle 55/75° Maximum surface 2,586 psig At total depth (TVD) 4,000 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' ___200 CF 12.25" 9.625" 47.0# L-80 BTC 3,000' 41' 41' 3,041' 2,389' 820 Sx Permafrost E & 12.25" 9.625" 36.0# J-55 HF-ERW 3,425 3,041' 2,389' 6,466' 4,369' 500 Sx Class G 8.5" 7" 26.0# L-80 BTCMOE 6,505' 41' 41' 6,546' 4,415' HF-ERW 8.5" 7" 26.0# J-55 BTC 4,720' 6,546' 4,41 5' 11,266' 6,743' 250 Sx Class G HF-ERW Top 500' above Kuparuk 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Sot°rnU~tuUcrta°lr R E C E I V [ D Surface Intermediate io. 2 199,,'3 Liner Perforation depth: measured Alaska.Oil & Gas Cons, ~qm_~ql3 true vertical ~C,~m-.~. >~,~ 20. Attachments Filin9 fee X Property plat r-a BoP Sketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot r"] Refraction analysis E~ Seabed report r'~ 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~/~¢~~_ - Title Area Drillin, Engineer Date/1'--'3/~3 Commission Use Only Perm~..~m be~ ~2, J AP, number J Approval dat~ ~(_.~~ ~_~ See cover letter for ' - 50- d.,~' - ~ ~ ,.~,.~' other requirements Conditions of approval Samples required [-'] Yes ~] No Mud Icg required r'l ~'s C~ No Hydrogen sulfide measures r-I Yes "~ No Directional survey required ~ Yes E] No Required working pressure for BOPE 2M 3M [] [] 1OM I--I 15M Other: OFJgjr'lc~i ¢'.: by order of J.._C~K).~_~ o~gned By Approved_ by .r'".-.....: .u ~,~.. . Lr'.h ~. ~t."-.~. Commissioner the commission Ddt Form 10-401 Rev. 7-24 Submit in triplicate Created by : jones For: D STOLTZ Date plotted : 17-Mar-g3 Plot Reference is 15 Version #5. Coordinates are in feet reference slot #15. True Vertical Depths ore r,eference wellhead. ARCO ALASKA, Inc. Structure : Pad 1H Field : Kuparuk River Unit Well : 1.3 Location : North Slope, Alaska S 85.13 DEG E 7547' (TO TARGET) Scale 1 : 200.00 4o0 0 40o s00 ~ 200 ~600 2000 z~oo I I V 4,50. o '$50 900 1350 . 1800. _ 2250_ . _ 3150_ - 3600 _ _ _ _ ,$95O _ - 5,$00_ . 5850. 6300_ _ 6750_ 72001 East --> 2800 5200 .3600 4000 4400 4800 5200 5600 6000 6400 I I I I I I I I I I I I I I I I I I I I SURFACE LOCATION: [ 709' FNL, 790' F-EL SEC. 35, T12N, RIOE RKB ELEVATION: 96' t KOP WD=300 TMD=$O0 DEP=O $.00 12.0O )~ BUILD ,3 DEG / 100' ~3~.oo B/ PERtvlAFROST rv'D=1672 TMD=1851 DEP=SB1 ~.oo EOC ~VD=1859 TMD=2123 DEP=806 6800 7200 7600 8000 8400 I I I I I I I I TARGET LOCATION: 1550' FNL, 1450' SEC. 35, T12N, RIOE TARGET TV0=6488 TMD=10314 0EP=7547 SOUTH 641 EAST 7520 r TD LOCATION: I 1428' FNL, 2366' F'WL SEC. 35, T12N, RIOE 880O 8OO 1200 TANGENT ANGLE 54.69 DEG T/ UGNU SNDS TVD=3156 TUD=4368 DEP=2638 T/ W .SAK SNDS 3VD=3793 TMD=5470 DEP=3537 B/ W SAK SNDS TVD=4169 TMD=6120 DEP=¢068 K-lO TYD=4846 TMD=7292 DEP=5024 TARGET ANGLE 75 DEG K-5 TVD=6091 TMD=9446 DEP=6781 BUILD 3 DEC / loo, BEGIN RNAL BUILD TVD=6202 TMD=9637 DEP=6938 O0 7" CSG CONT. PT TVD=6444 TMD=10164 DEP=7404 TARGET - T/ KUP SNDS (EOC) TVD=6488 TMD=10314 DEP=7547 T/ ZONE C TVD=6547 TMD=10542 0EP=7767 B/ ZONE C T'VD=6685 TMD=11066 DEP=8273 TD / LOGGING PT TVD=6734 TMD=ll~66 DEP=6466 ' ' ' ' ' ' ' ' ' '5' ' ' '~' ' ' L' &' ' ' ' ' ' ' ;00' '5' 100'i,o' ' 'a' 450 900 1350 1800 22 0 2700 31 36430 40 4 4950 5400 5850 6 67 0 7 7 8100 8 Scole 1 : 225.00 Vertical Section on 94.87 ozimufh w|fh reference 0.00 N, 0.00 E from slof ~1,~ . . . 10 11 12 13 14 15 16 17 18 GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD IH-13 Move in and rig up Parker #245. Install diverter system. Drill 12-1/4" ho'~e to 9-5/8" surface c~-~sing point (6,436')accordin~ to dir~ctior~,'.l plan. Run and cement 9-5/8" casing, Install and test BOPE. Test casing to 2000 psi. Drill out cement and 10' of new hole. Perform leak off test to 13.0 ppg EMW. Drill 8-1/2" hole to total depth (11,266') according to direction,al F, lan. Run open ~-~ole evaluation logs or LWD tools as needed. Run and cement 7" casing. (If significant hydrocarbon zones are pre.~nt a~o,z~ the Kuparuk, sufficient cement will be pumpedlfor isolation in accordance witi'~ Rule AAC 25.030. Alternatively, if significant hydrocarbon zones occur ~,ithi,,~ 200' of the surface casing shoe, cement will be down squeezed in the a~-~ ular ,:;!-)ace b .:~'¢/een the surface and production casing after th~:~ primary cem~ant jol:; is con':'::,~,ated Pressure test to 3500 psi. ND BOPE and install lower production tree assembly. Secure weil and release rig. Run cased i~ole cem~,r~t evaluation and gyro iogs Move in a~ rig up Nordic #1. Install and i'e~t BOPE. PerfoCate a.~",~, run completion assembly, set and test p~cker ND BOPE ar,:_~ install production tree. Shut in and ~'. ~:;ure well. Clean location and release rig. RECEIVED Alaska .Oil & 6as Cons. Commission 'Anchorage, DRILLING FLUID PROGRAM Well 1H~13 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing 9.0-9.6 15-25 15-35 45-75* 5-15 15-40 10-12 9.5-10 _+10% Dri!~ out to weight up 8.4-9.6 5-15 5-8 30-40 2-4 4-8 8-10 9.5-10 4-7% Drilling Fluid System: Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD See Well Plan 10-18 8-12 '35-50 2-4 4-8 4-5 thru Kuparuk 9.5-10 <12% Drilling fluid practices will be in accordance with the appropriate regulatio'.--;s st¢':.:~d in 20 AAC 25.O33. Maximum anticipated surface pressure is calculated using a surface cc~::lg leak-r.,¢f of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation i:',,reakd(,wn would occur before a surface pressure of 2,586 psi could be reached. Theref~:.~re, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest well to 1H-13 is 1H-09. As designed, the minimum distance betweer~ the two wells would be 29' @ 240' MD. The wells would diverge from that point. Incidental fluids developed from drilling operations will be hauled to the nearest pe,'mitted disposal well or will be pumped down the surface/production casing an~ulus of the last well drilled. That annulus will be left with a non-freezing fluid during a~y extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 225 sx o: ;ement ~Ollowed by arctic pack upon completion of fluid pumping. *Spud mud shoukl be adjusted to a FV between 55-75 sec/qt to drill gr.:,v~.~;I beci:~. Adjust FV to 45-55 sec/qt below gravel beds. 50 I Scale 1 · 50.00 0 50 1 O0 I, I I I I I I 1900, 2300 O0 33OO 3500 4100 4300 15O 2OO I I I 1300 1 lO0 East 250 300 I I I 350 I I 400 450 500 550 600 I I I I I I I I I I I PR ARCO ALASKA, II'lC. Structure : Pad 1H Well : 13 Field : Kuparuk River Unit Location : North Slope, Alaska 1500 1300 'SED 65O 200 _ 150 _ 100 A I - I _50 Z 0 O - I I _100 V _150 _ 200 Casing Design / Cement Calculations 21-Mar-93 Surface Csg MD: Surface Csg TVD: Production Csg A MD: Production Csg A TVD: Production Csg B MD: Production Csg B TVD: Top of West Sak, TMD: Top of Target, TMD: Top of Target, TVD: Estimated Mud Weight: Surface Casing Choice: Production Csg A Choice: Production Csg B Choice: Production Casing Frac. Pressure 6,466 ft 4,369 ft 6,546 ft 4,415 ft 11,266 ft 6,734 ft 5,470 ft 10,314 ft 6,488 ft 12.3 ppg 3,500 psi Maximum anticipated surface pressure TVD surface shoe = 4,369 ft {(13.5'0.052)-0.11}*TVDshoe =1 2,586 psiJ Estimated BH pressure at top of target zone Anticipated Mud Weight = Top of Target Zone, TVD = 100 psi Overbalance = :[ 12.3 ppg 6,488 ft 4,150 psi 4050 psiJ Surface lead: Top West Sak, TMD = 5,470 ft Design lead bottom 500 ft above the Top of West Sak = 4,970 ft Annular area = 0.3132 cf/If Lead length * Annulus area = 1,557 cf Excess factor = 15% Cement volume required = 1,790 cf Yield for Permafrost Cmt = 2.17 Cement volume required =[ 820 sxJ Surface tail: TMD shoe = 6,466 ft (surface TD - 500' above West Sak) * (Annulus area) = 469 cf Length of cmt inside csg - 80 ft Internal csg volume = 0.4110 cf/If Cmt required in casing = 33 cf Total cmt = 501 cf Excess factor = 15% Cement volume required - 577 cf R~ E (~ E IV E D Yield for Class G cmt= 1.15 Cement volume required =1 500 sx} MAR ~ ?. t993 Alaska Oil & Gas Cons. Comr~iss[o~ Anchorage 1 Casing Design / Cement Calculations 21-Mar-93 Production tail' TMD = 11,266 ft Top of Target, TMD = 10,314 ft Want TOC 500' above top of target = 9,814 ft Annulus area (9" Hole) = 0.1745 (TD-TOC)*Annulus area: 253 cf Length of cmt wanted in csg = 80 ft Internal csg volume = 0.2148 Cmt required in casing = 17 cf Total cmt = 271 cf Excess factor = 15% Cement volume required = 311 cf Yield for Class G cmt = 1.23 Cement volume required =[ 250 sxJ TENSION - Minimum Design Factors are: T(pb)=1.5 and T(_is)=1.8 Surface (Pipe Body): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (WEft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Pipe Body) = Design Factor =[ 108600O lb 6,466 ft 47.00 Ib/ft 303902.0 lb 56070.6 lb 247831.4 lb 4.4J Surface (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =1 1161000 lb 6,466 ft 47.00 Ib/ft 303902.0 lb 56070.6 lb 247831.4 lb 4.71 Production A (Pipe Body): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Pipe Body) = Design Factor =[ 604000 lb 11,266 ft 26.00 Ib/ft 292916.0 lb 54338.8 lb 238577.2 lb Production A (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =1 667000 lb 11,266 ft 26.00 Ib/ft 292916.0 lb 54338.8 lb 238577.2 lb 2.81 Casing Design / Cement Calculations Production B (Pipe Body): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Pipe Body)= Design Factor =1 Production B (Joint Strength): Tension (Pipe Body) = Dead Wt in Air - Buoyant Force Dead Wt in Air = Length * (Wt/ft) Buoyancy = Weight of displaced mud Casing Rated For: Length = Casing Wt (Ib/ft) = Dead Wt in Air = Buoyancy = Tension (Joint Strength) = Design Factor =[ BURST - Minimum Design Factor = 1.1 Surface Casing: Burst = Maximum surface pressure Casing Rated For: Max Shut-in Pres = Design Factor =[ Production Csg A: 1. Design Case - Tubing leak while well is SI Inside pres=Csg Frac pres(3500 psi)+Mud Wt*.052*TVD Outside Pres=Backup Gradient (8.9ppg *0.052*TVD) Net Pressure = Pressure inside-Pressure outside Design Factor = Rating / Net Pressure Casing Rated For: Inside pressure = Outside Pressure = Net Pressure = Design Factor =[ Production Csg B: 1. Design Case - Tubing leak while well is SI Inside pres=Csg Frac pres(3500 psi)+Mud Wt*.052*TVD Outside Pres=Backup Gradient (8.9ppg *0.052*TVD) Net Pressure = Pressure inside-Pressure outside Design Factor = Rating / Net Pressure Casing Rated For: Inside pressure = Outside Pressure = Net Pressure = Design Factor =[ COLLAPSE- Minimum Design Factor = 1.0 Surface Casing 1. Design Case - Lost circulation and Fluid level drops to 2000' TVD with 9.0 # Mud 2. Ext. Pres=Mud Wt*0.052*TVD-(2000'TVD of 9# Mud) Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =1 Production Csg A 1. Worst Case - Full evacuation of casing 2. Mud weight on outside = Mud Wt * 0.052 * TVD Casing Rated For.' Mud Gradient = Ext. Pres. @ Bottom = Design Factor =1 Production Csg B 1. Worst Case - Full evacuation of casing 2. Mud weight on outside = Mud Wt * 0.052 * TVD Casing Rated For: Mud Gradient = Ext. Pres. @ Bottom = Design Factor =[ 21-Mar-93 415000 lb 4,720 ft 26.00 Ib/ft 122720.0 lb 22765.7 lb 99954.3 lb 490000 lb 4,720 ft 26.00 Ib/ft 122720.0 lb 22765.7 lb 99954.3 lb 4.9] 6870 psi 2586.4 psi 2.7J 7240 psi 6324 psi 2043 psi 4281 psi 1.7J 4980 psi 7807 psi 3116 psi 4691 psi 1.1J 4750 psi O.64O Ib/ft 1858 psi 2.6J 5410 psi 0.640 Ib/ft 2824 psi 1.91 4320 psi 0.640 Ib/ft 4307 psi 1.0J Casing Design / Cement Calculations 21-Mar-93 Surface Casing Choices OD ID Ib/ft Grade Metal X-Section Jt Strength Body Strength Collapse Burst I 9.625 8.681 47 L-80 13.5724 sq. in. 1161000 lb 1086000 lb 4750 psi 6870 psi 2 9.625 8.835 40 L-80 11.4538 sq. in. 979000 lb 916000 lb 3090 psi 5750 psi 3 9.625 8.921 36 J-55 10.2545 sq. in. 639000 lb 564000 lb 2020 psi 3520 psi 4 10.750 9.950 45.5 J-55 13.0062 sq. in. 931000 lb 715000 lb 2090 psi 3580 psi Production Casing Choices OD ID Ib/ft Grade Metal X-Section Jt Strength Body Strength Collapse Burst I 7.000 6.276 26 L-80 7.5491 sq. in. 667000 lb 604000 lb 5410 psi 7240 psi 2 7.000 6.276 26 J-55 7.5491 sq. in. 490000 lb 415000 lb 4320 psi 4980 psi 20" K .PARUK RIVER UNIT DIVERTER SCHEMATIC I 3 DO NOT SHUT IN DIVERTER AND VALVES AT SAME TIME UNDER ANY CIRCUMSTANCES. MAINTENANCE & OPERATION . UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESi-S APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD 3. DIVERTER ASSEMBLY WITH ONE 2-1/16"- 2000 PSI BALL VALVE 4. 20"-2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20" - 2000 PSI ANNULAR PREVENTER EDF~1~92 - 6 5 4 I3 I2 I 13 5/8" 5000_ OP STACK ACCUMULATOR CAPACITY TEST 1. Cl' ?CK AND FILL ACCU :!ULATOR RESER. ' IR TO PROPER LEVEL W; ? HYDRAULIC FLUid' 2. A:: i ..'RE THAT ACCUMI,.!!_..:~I'OR PRE. SSUF · ~ 300(' oSI WITH 15~;;..? PSI DOWNSTREAM OF THE REGUL/ 3. OBSERVE TIME, THEN CLOSE ALL UNITS .... ':JLT,,~.,~OUSLY AND RE':~ORD THE TIME AND PRESSUJ~E ,qEM,~".:?,IING ~i:'TER ALL UNITS AFi~ CLOSED WITH CHA;:-~GING PUM:'-' OFF. 4. RECORD ON THE IADC RE?CRT. THE ACCEPTABLE LOWER LIM;T IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH WATER. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TESTALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE LINE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. 7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. CONTINUE TESTING AL VALVES, LINES, AND CHOKES WlT!'-~ .i.~ 250 PSI LOW AND 3000 PSI HIGH. TEST AS IN STFr~ 4. DO NOT PRESSURE TEST ANY 8. CHOKE THAT IS NOT A FULL CL':'.)~ING POSITIVE SEAL CHO'. ?.. OPEN TOP PIPE RAMS ?¢',JD CL£:~E BOTTOM PIPE RAMS. T;~':~.'T BOTTOM 9. RAMS TO 250 PSI AND ~0.00 PSI. OPEN PIPE RAMS. BAC. i(OFF RUNNING JT AND' ,"ULL OUT OF HOLE. 10 CLOSE BLIND RAMS AND TEST TO 3000 PSI F¢.;::.~ !0 MINUTES. BLEED TO ZERO PSI. OPEN BLIND RAMS AND RECOVER TEST PLC:' MAKE SURE MANIFOLD 11, AND 12. LINES ARE FULL OF ARCTIC DIESEL AND ALL ~'ALVES ARE '::!':T IN THE 13. DRILLING POSITION. TEST STANDPIPE VALVES TO 3000 PSI. 14. TEST KELLY COCKS AND INSIDE BOP TO 3000 P~. ' WITH KOOMEY PUMP. RECORD TEST INFORMATION ON BLO¥'"',UT PRE~/ENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16" - 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5000 PSI SPACER SPOOL 4. 13-5/8" - 5000 PSI PIPE RAMS 5. 13-5/8" - 5000 PL4 DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5000 PSI ANNULAR SRE 8/22/89 1H-13CMT.XLS State: Well: Field: State Permit It 1H-13 Kuparuk River 93-49 Engineer.' Work S beet: Date: 3/22/93 C~ Car~'~g Size -Inches Casing Length - Feet Hole Diametel -Inches Cement- Sacks 111 Cement- Yield 111 Cement- Cubic ft I11 Cement- Cubic ft 111 Cement- Sacks 112 Cement- Yield II2 Cement- Cubic ft :112 Cement- Cubic ft 112 Cement- Sacks 113 Cement- Yield 113 Cement- Cubic ft 113 Cement- Cubic ft #3 Cement-Cubic ft /Vol Cement- Fill Factor Conducto~ 1G.000 80.000 24.000 0.000 0.000 0.000 200.000 0.000 0.000 0.000 O.000 200.000 1.432 Surface 9.625 6,425.000 1Z250 820.000 2.170 1,779.400 1,779.400 1.150 575.00O 575.000 0.000 0.000 0.000 0.000 2,354. 400 1.170 Liner 0.000 0.000 0.000 0.000 0.000 0. O00 0.000 0.000 0.000 0.000 0.000 0.000 ItDIV/O! Cas'rog T~ Casing Size Casing De~h Hole Diameler Cement-Sacks Cement-Yield Cement- Cubic ft Cement- Cubic ft Cement- Sacks Cement- Yield Ceme~- Cubic ft Cement-Cubic l{ Cement- Sacks Cement- Yield Cement- Cubic fl: Cement- Cubic ft Cement- Cubic ft / Vol Cement- interval ft Top of Cement- Feet Intermediate 111 Intermediate 112 Production -Inches 0.000 0.000 7.000 - Feet 0. 000 0. 000 11,266.000 - Inches 0.000 0. 000 8. 500 111 0.00 0.00 250.00 111 0.00 0.00 1.23 111 0.00 0.00 307.50 111 0.00 0.00 307.50 112 0.00 0.00 0.00 112 0.00 0.00 0.00 112 0.00 0.00 0.00 112 0.00 0.00 0.00 113 0.00 0.00 0.00 113 0.00 0.00 0.00 113 0.00 0.00 0.00 113 0.00 0.00 0.00 0.00 0.00 307.50 11DIV/0! 11DIW0! 2,424.95 ItDIV/O! Printed 3/22,,,'93 #DIV/O! 8,841.0 Measured Depth /_ ITEM (1) Fee (2) Loc . ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE DATE [-9 -thru i3] ' ~ [10 & 13] [14 thru 22] (5) BOPE ~'~' ~-", [23 thru 28] Company YES 1. Is permit fee attached ............................................... ~ 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... ~ 4. Is well located proper distance from other wells ..................... ~ 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party .................................. ~ 8. Can permit be approved before 15-day wait ............................ /~.. e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in Force ................................... ~ Is a conservation order needed ....................................... I s adm i n i st rat i ve approva 1 needed .................................... Is lease number appropriate .......................................... ~ Does well have a unique name & number ................................ /~x Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface g intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wel ]bore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... DOes BOPE have sufficient pressure rating test to ~ -- ~:, OOO, psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... Lease $ Well NO ~EMARKS [29 thru 31] geology: eng i neet ing: DWJ.~ MTMz?:':' RAD .~ RPC/~ BEW JDH-~ LG rev 12/92 jo/6.011 29. 30. 31. 32. 33. FOR EXPLORATORY & STRATIGPU~PHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone number of contact to supply weekly progress data ...... Additional requirements ............................................. iNITIAL GEOL UNIT o'N/OFF POOL CLASS STATUS AREA ~ SHORE ~o,,'~o .z~,,., 1-o;/ ??~ u/co 0,6 Additional remarks' UM ..MER I D I A~_.l. · SM WELL_ .TYPE: Exp/Dev_ Inj Red ri 11 Rev · O ~Z Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history' file. To improve the readability of the Well History file and to simplify finding information, informati;3n of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~PI NUMBER ~ 50'029'22356 ~kFE~E~CE ~0 = 9~155 RECEIVED AUG 0 9 1995 Alaska Oil & Gas Cons. Commission Anchorage LIS Tape Verification 51st~nq Schlumber.ger Alaska Computlnq Center 3-JUN-1993 08:50 D~TE~ : 93/06/ 2 R~EL NA~E .: 9~55 COMMENT : ARCO ALASKA, !NC., KUPARUK RIVER (INIT, 1H-13, 50-029-22356-00 **** TAPE NEADER **** SERVICE NAME : EDIT DATE : 93/06/ 2 TAPF NAME : 93~55 CONTINU.ATI~N # ~REVIOUS TAmE CO~E~T : aRCO ALASka, iNC,, KUPARUK RIVER U~IT, ~H-13, 50-029-22~56-00 KttP.~RUK RIVER UNIT MWD/MAD LOGS W~LL NAME: aPI NUMBER: OPERATO~ bOGGING COMPANY: T~M CREATION DATE~ JOB DATA ,3OB NUMBER: LO~G!NG ENGINEER: OPERATOR i~ITMESS: SURWACE b~CAT!ON SECTION: TOWgSHTP: ~LEVaTIO~(FT F~OM ~$L O) KELLY BUSHING: DERRICK FLOOR: GROUND bEVEL: WELL CASING RECORD '.BIT RUN 1 TU}~ELL 1ST STRIe{G 9MD STRING BIT RUN ~ BIT RUN 3 33 12N 10~ '/O9 790 96.00 96.00 54.00 OPEN HOLE CASING DRILLERS 8{T SIZE (IN) SIZE PAGE: SchlUmberqer Alaska ~Computln_~ Center 3-JUN-1993 08:50 ~RD STRING PRODUCTION STRING REMARKS: FIELD ENGINEER'S REMARKS: ********** BIT TO R~S 41.2~', ~MIT TO GR ~51.6g~, BIT.TO T TO ~EUT ,IIL.6$°.~,DRIt,~E~ i~RV~b g488 AVEDA~E HOLE DEVIATION: 66 .PEG 9785' TO ROTATIONAL BULK DENSITY PROCES$I'~G USED.:maRITE ADDED TO MUD SYSTE~,. DATA FROM DOWNHOLE ~EMORY DOWNHOLE SOFTWARE VERSION V4,0C, KUPARUK"INTERVA~ NOT bOGGED WiTH LWD, TD WELL ~047~5 ON $ $ **** FILE HEADER **** NA.M : .00[ : VKRSIO~ : 001A07 ~X REC SIZE ~ ~024 F~LM TYPE ~ LO LASTFI. LE ~e~th sh~ted ~nd ¢l~med eurvesl DMPTH~ INCREmEnT 0,~000 FILM SUMMARY ~RU TOOL coDE CDR BA$~LINE CHRV~ FOR SHIFTS: GR CURVE SHIFT DATA CME&SUDED DEPTH) BASELINE DEPTH 10065,5 10009.5 9833.0 9740,5 9721.5 968q.5 9653.5 9597.5 9575.5 START' DEPTH 650].0 6503.0 al.! blt runs merged. STOP DEPTH I005~,0 10i22,0 ----------EQUIVALENT UNSHIFTED DEPTH .... ------ 10076,5 100~9.0 9749.5 q734,0 970~.0 9665.5 961~,5 9585,0 SChlumberger Alas~a ComPUtinq Center 95475 9507 5 9484.5 9450.0 9391.5 9379,5 932 5 9212.~ 9144.5 q079 5 8525.5 ! O0.0 MERGED DATA SOURCE KRU TOOL CODE 9560.0 ~53~.~ 95~7'5 949~ 9406 0 9395~0 9335'0 909~,.0 861.7,5 8540.5 115.0 BlT RUN NO, ~ERGiM TOP . ~E~GE BASE · THE D~PTH ADJUSTMENTS SHOWN ABOVE REFLECT MWD GR TO' , WI.R~GIN~ CR OF 25-'.APR-93, ALL OTHE~ CURVES WERE CARRIED WITH THE.GR SHIFT. THE SAMP(~iNG TICK~. IN FILE ~2 ARE AT ~ 0.~' RAT~. ADDITIF)NA5 ANADRILb DATA I8 IN PI~ 5, LIS FOR)(AT DATA PAGEI ** D~Ta FORMAT SPECIFICATION RECORD ** ** 8ET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 o LIS Tape Verification Listing Schlumberoer Alaska Comptltin~ Center 3-jUN-I9g3 08:50 D~P~ DRHO ~w~ ~F MWD RP ~op ~D G~ NSI ~WD R$I MWD T~B MWD TABD ** Sg? TYPE - CHAN NAM~ ~RV UNIT ~E~V'IC~ API API pi; A ID ORDER # [,OG TYPE ChASS MOD FT 61~9q6 O0 000 0 I 1. 4 ~WD G/C3 61~gg6 O0 000 O0 0 I ! I 4 68 0000000000 G/C~ ~1~996 O0 000 O0 0 I I 1 4 6g 0000000000 BN/E 618996 O0 000 O0 0 I ! i 4 68 0000000000 IN 619996 O0 000 O0 0 1 I 1 4 68 0000000000 PU-S 619996 O0 000 O0 0 i 1 1 4 68 0000000000 OHMM 618996 O0 000 O0 0 1 I t 4 6~ 0000000000 O~MM 61~996 O0 000 O0 0 I ! I 4 68 0000000000 F/HR 618996 O0 000 O0 0 ! I t 4 68 0000000000 GAPI 61~996 O0 000 00 0 I 1 1 4 68 0000000000 618996 O0 000 O0 0 1 ! I 4 68 0000000000 618996 O0 000 O0 0 1 I I 4 68 0000000000 CPS 61~996 O0 000 O0 0 ! 1 1 4 69 O00000000O CPS 618996 O0 000 O0 0 i I 1 4 68 0000000000 61~996 O0 000 O0 0 ! I I 4 68 0000000000 618996 O0 000 O0 0 1 I 1 4 68 0000000000 FI NUMB NUMB ~ E EPR PRO ESS CODE ( HEX ) 68 0000000 0 DEPT. ClLN.MWD HENa.MWD DFDT. ClbN.~WD ~OP.~wD H~N~.~WD C~.MWD HEN~..WD C~LN.NWD D~PT. C.~bN.MWD ROm. MWD -999.~50, NpHI.MwD ,999'250 RA.i~D :999:~50~ RP MWD 85. lO GR.~WD ~999,250 N$I, WD -999 50 -999.250 HEFA.MWD 999,~50 TAB.MWD -999'~50 TABD.~WD 10000.000 RHOB.~WD ~.379 DRHO.MWD -0' 0~7 DEF.MWD ' a.5!8 NDHI.MWD 39o07~ RA.~WD ~:024 RPo~WD 84,116 GR.MWD 109.609 N$I.MWD 1 000 269'750 HEFA.MWD 5.555 TAB.MWD 0:537 ~500.000 RHOB.MWD ~.42~ DRHO.~WD 0.014 DEFoMWD MWD 45.600 RA.MWD 3.071 RP.VWD e.~6 NPHI:~, .~. 79.309 GR .WD 129,164 N$I.M~D 0.000 256.750 HEF~.MWD 4.683 TAB,~WD 0.355 TABD.MWO 9000.000 PHOBoVWD ~.46B D~HO,~WD -0.05~ ~.7~] NPHi.~WD 26,994 ~A.~WD 3.646 ~PoMWD 162.172 GR,~WD 53,781 N$I,~WD 0.000 R$I.~WD 334.250 H~FA.~W9 9,~03 TAB,aW~ 0,28! T.IBD.~WD ~500.000 ~HOB.~WD ~.~66 DRHa.~WQ 0.010 PEF.HWD 8.652 ~PUI.~WD 35.400 RA,MWD ~.558 RP.MWD I51o268 GR.~WO 143.65~ NSI.MWD 1,000 273.6~5 HEFA.~WD 6.14~ TAB.~W9 0.629 :999,250 .999,250 999.250 '999,250 2.553 1.000 1.497 4,373 ooo 0,991 5,259 4.~91 0,000 0.767 ,282 .500 1.000 1.261 lumberger Alaska Co,PUt. lng Center DEPT' $000,000 ~HOB.MWD CaLN.MW{) 8.641 NPHI.~WD ~OD,~WD 268.737 GR.MWD HEN~.MWD 263'000 HEFA.MWD D~PT. 7500'000 CALN.MWD 8.698 NPH!,MWD ROP.MWD 181,8~0 vooo.,ooo ROP.MWD 135,791 ~R,MWD H,E~,~ i~WD 274,250 DEPT* 6503'000 CIL~.MWD 9*:803 ~OP.~W:9 535'375 GR.MWD H~a.MWD 235.259 END OF DATA ** 3-JUN-!993 08:50 2.409 DRHO.MWD 34.ooo !74,98! NSI.M'WD 3 ~00 R~ 92,431 NSI.MWD 5.573 T~B.MWD 105.325 NSI,MWD 6,063 TAB.~WD A.909 DRHD.MWD 89.627 N$I,MWD 4.]63 TAB.~WO o.06i 3.483 0.356 o.oo0 0.~19 -o 3i213 0 PO0 0.~78 -0'032 4'580 0 00 PEF.MWD RP,MWD R$I'MWD TABD.~WD DEF MWD RP2MWD T=&BD,MWD pEF.MWD R~.MWD RS ~iMWD TABD,MWD P~F,MWD RP.~WD RSI,~WD TABD,~WD PAGE{ 3.869 6.630 0.000 1,564 2,843 2,386 §:ooo 578 2.905 3.!35 1,000 0.8~0 2.:018 4,676 0,000 1.700 FIL~ NA~E VERSION D~TE ~ax REC SIZE FTLF TYPE L~S· FILE TRAILER **** : EDIT .O01 : FbtC : 001AO7 : 93/06/ 2 : 1024 **** FILE FILE NAME SERVICE DATE ~× R~C SIZE FILF TYPE L~ST FILE HEADER **** : EDIT: .0o2 : FLIC : O01A07 ~ 93/06/ 2 ~ ~024 : bO F!LE NEADER F?L~ NUMBED PAw MWD Curves and log BIT RT!M NU~BER: DEPTH INCDE,ENT: FILF SUMM~RY 2 header data 1 0.1 for each bit run in separate files. LIS Ta~e Verificat~,on l~istino SChlumberaer AlasKa ComPutind Center 3-JUN-1993 PAGE: VEND~P TOOL COD~ START DEPTH 6503.0 6503.0 LOG HEADER DATA DAT~ SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE CME~ORY OR REAL-TIME): TD DRILLER TOP LOG INTERVAL ROTTOM 50G INTERYAL BIT NOTATING SPEED ~OLE IMCLI~ATION (DE~) ~AXI~UM ANGLE~ TOOL STRING, (TOP TO BOTTOm) YENDO~ TOOL CODE TOOL TYPE CDN NEUTPON/POROS!TY CDR RESISTIVITY $ BOREHOLE AMD CASI~ DATA OPE~ HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): STOP.~DEPTH ~0122,0 '10053,0 oa-4PR-93 FAST v4,0C ~E~ORY' 10{52,0 6503,0 I0t62.0 T00b NUMBER NDS055 ~S042 8 500. ~UD TYP~I ~U[~ DENSITY [LB/G): ~UD VISCOSITY HUD CgLORIDES CPPM): FLUID b055 (C3): RESISTIVITY ¢OH~ AT TEMPERATURE DEGF) MUD AT MEASURED TEMPERATURE CST): ~UO AT ~AX CIRCULATING T~PERATURE: gUD FILTRATE AT MU~ CAK~ AT MT: 9,80 3,500 3.480 60.0 60,0 ~MUTROM TOOL ~ATmlX DENSITY: HOLE COPRECTION SANDSTONE 2.65 8,500 TOOL STANDOFF (IN): ~W~ FREOUENCY (HZ): THIS ~I[,E CONTAINS THE SAMPLING TICKS FRO~ TME ~ERGED MWD FILE WHICH HAS BEEN INCREMENTED TO A SAMPLE RATE OF 0,1', THE CUWvFs WITH EXTENSION NAMES OF ',SHF' MArE Schlu¢,.berq~r"'' Alaska Computlno Center 3'JUN-1993 08:50 BEE~ DEPTH-ADJUSTED THE SA~E AMOUNTS AS DOC ...... E~'iTED IN THE PRE~IOI,~:SV H FILE, , THE' CURVES WITH EXTENSION NA~ES OF .,RAW' AR~ UNSNIFTED a~O ~ATCH THE ORIGINAL FIELD PRINT, $ [,IS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE -.64EB ** TYD~ REPR CODE VALUE J 66 0 2 66 0 4 66 5 66 7 65 9 65 11 66 i~ 66 0 14 65 FT !~ 66 68 16 66 l 0 66 I ** SET TYP~ - C~N ** NAM~ SERV UNIT SERVICE ~PI APT APl A~I FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # hOG TYPE CLASS ~DD NU~ SA~P EL~ CODE (HEX) .............,,...,....................-...... ...... ...........,.....,,.-........-.--.. D~PT . {8996 O0 000 O0 0 2 1 ! 0000000000 618996 00 000 00 0 2 ! I 4 68 0000000000 GTC~'SHF S NTC~ SHF S 518996 00 000 O0 0 2 ! 1 4 68 0000000000 OTCw S~F S 618996 O0 000 O0 0 2 1 1 4 68 O000000OO0 RTCw S~F $ 618906 O0 000 O0 0 2 1 1 4 68 0000000000 GTC~ RAW S 618996 O0 000 O0 0 2 1 1 4 68 0000000000 MTC~ RAW S 618996 O0 OOO O0 0 ~ 1 I 4 68 0000000000 OTCw ~AW S 615996 O0 000 O0 0 2 ! 1 4 68 0000000000 RTCW RAW S 618996 O0 000 O0 0 2 ! i 4 68 0000000000 mmmmmmm~mmmmmm~mm-mmmmmmm~mm-mmmm-m~mmm~m~mm--~mmm---m~--mmmmm--m---m~mmm--~m-m-mm~mm~ ** DATA ** Schlu~bera~r Alaska Co~putind Center DEPT. !0:121.500 RTCK ~F 1.000 GTCK.R:AW RTCK: AW -999,250 DEPT. i0900'000 GTCK.$MF RTCK'SHF -9:99,250 GTCK'R~W ~TCK.RAW -999.250 DEPT. 9500,000 GTCK,SHF ~c~,SHF -999,250 GTCK,RAW R~.~AW -999-250 ' DEPT. 9000.000 GTCK~$HF RTCK.SHF -999"~50 GTCK.RAW RTCK.RAW -999'~50 D~PT, 8500,000 GTCK,$HF RTCK.SHF '99'~'2150 GTCK,RAW RTCK'RAW -99 ,250 DEpT 8000,000 GTCK-$NF RTCK]$HF -999,250 RTCK'RAW -999.250 DEPT, 7500,000 G¥CK,SNF RTC~,$MF -999,250 GTCK,RA~ ~TCK.RAW D~PT, 7000,000 GTCK,SHF ~TCK-$~F -999,2~0 GTCK.RiW RTCK.~AW -999,250 DEPT. ~500,000 GTCK.SHF RTC~,$~F ~999,250 GTCK.RAW ~TC~.~AW -999.250 D~PT. 6420.{0! GTCK,SHF RTC~.$HF -999,250 GTCK.RAW RTCK.RAW -999.250 ** END OF DATA **** FILE FILM NAME SERVICE VERSION D~T~ v~× RMC SIZ~ ~LM TYPE L~ST FILE TRAILER **** : EOTT .002 : 001~07 : 9]/06/ 2 : 1024 ! LO -999,250 MTCK -999,250 -~99,250 ~TCK'SHF -~9~'~5o ~TCK.~AW -999.~50 ~TCK,SHF J,000 NTCK,RaW -999 250 NTCK'SHF -999:~50 NTCK~R.~.W - ,250 MTCK '999,~50 MTCK,SHF '999,~50 NTCK,RAW ,99~,~00 NTCK HF 999 250 NTCK,SHF -999 ~50 NTCK,$HF -999~ 50 ~TCK,RAW -999.250 NTCK.SHF -999'250 NTCK'RAW -999,:~50 -999.~50 -999.~50 '999,250 -999.250 -999~50 i.ooo '1,000 1.000 -999'250 '999,:~50 -999'250 ~999,~50 999.~50 -999,250 -999,250 '999 250 -999~2~0 DTCK'SHF DTCK,RAW DTCK,SHF DTCK'~AW DTC~ AW DTCK,SHF DTCK.RAW DTCK SMF DTCK:RAW DTCK.S~F DTC~,RAW DTCK,SHF DTCK.RAW DTCK AW DTCK.SHF DTCK.RAW DTCE.SHF DTCK.RAW PAGE: '999,250 '999'250 "999,250 '999,250' '999,250 ' 1.000 -99 "999.250 {o000 ~999 0 -999,250 -999.2~0 -999.250 ~.000 -999,250 -999.250 Schlumberger AlasKa Computing Center PAGE: FIL~ NAME : ~DIT .003 V~$iON ~ O01A07 DaT~ : 93/06/,2 ~AX REC SIZE : ~0~4 FIL~ TYPE bAST FILE F!L~ HEADER FIL~ ~UMBER 3 Curves and log header data for each bit run. in separate files. BIT .R!Jh! NU~ER: I DEPTH INCREMENT: 0.5000 # FI5~ SUMgARY VENDOR TO05 CODE START DEPTH CDP 6430,0 CDN 6356.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DAT~ TYPE (MEMORY OR REAL-TIME): TD DRILLER TOP LOG INTERVAL ~OTTO~ D~G INTERVAL BIT ROTATING SPEED HOLE INCLINATION MIN!gUM ANGLE~ ~AX!~U~ ANGLE~ TOOL STRING CTOP TO BOTTOM) VENDO~ TOOb CODE TOOL TYPE CON MEHT~ON/~ORO$ITY CDR RESISTIVITY $ AND CASING DATA HOLE BIT SIZE {IN}: DRILLERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPF: ~UD DENSITY (LB/G): ~UD V~SCOSITY ($): STOP DEPTH 000 o o 4 2 ~ o 0 3..APR'.9 3 FAST 2,3E V4,0C 6488.0 6356.0 !0110,0 TOOb NUM5FR RGS042 8,500 6488.O 9.80 $cblu~berqer A!as~a Computln~. Center 3-JU~-199~ 08:50 PAGE: 10 ~ESISTIVITY ~UD AT ~AX C!RCULATIMG T~PERATURE~ ~UD FILTRAT~ AT ~T~ MUD CAKE AT NEUT~OM TOOL MATRIX: M~T~iX DEM$ITY~ HOLE CORRECTION (IN): TOOL STANDOFF (liN): FREOUENCY (H~)~ 3.500 3.480 60.0 60,0 SANDSTONE 2.65 8.500 ****i***** R[.~N. ! ********** BIT T~ ~ES 4!,27' BIT TO GR 5!.69'. BiT T0 DEN 108 ~8' BIT TQ NEUT I15.6g' ."DRILLED INTERVAL 6488' TO 1015~ AVERAGE HOLE DEVIATION: 55 DEG 64.88f T'O 9785'. AVERAGE HOLE DMVIATION~ 66 DMG~ 9785' TO ROTATIONa. L BHbK DENSITY P~OCESSIN~ USED.: B.~RITE ADDED TO MUD SYSTEM DATA FROM DOWNHOLE M~:~ORY. DOWMHObE SOFTW'~RE.'vER:S~ON V4.9~,- ~UPARUK INtErVAL NOT LOGGED LIS FORMAT DATA ** DAT~ FORMAT SPECIFICATION RECORD ** SET TYPE - 64E8 ** TYPE REPR CODE VAbHE ! 66 0 2 66 0 3 73 68 4 66 5 66 6 73 7 65 8 68 0.5 9 65 mT 1! 66 15 1~ 68 13 66 I~ 65 FT 15 66 68 t6 66 $¢hlu~berQer ..l~s~c~ Comput n~ Center 3-JUN-1993 08:50 PAGE: TYP~ REPP CODE YAELU 0 66 .l. · ** SET TYPE - CHAN ** .... .,.-,..,-.-..-........... ..... .............,.,.............-.-.....----,,...--- ........ SER NI SERVYCE APl AP1 APl API FILE H B MI!MB SIZE REPR PRQ...ES8 ID ORDER ~ LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX) DFD? FT 6]8996 O0 000 O0 O 3 I 1 4 68 0000000000 RNOB LW] G/C3 61~996 O0 000 O0 0 3 ! 1 4 6~ 0000000000 D~NO LW/ ~/C3 6~996 O0 000 O0 0 3 ! 1 4 68 0000000000 P~F LW~ 618996 O0 000 O0 0 3 ~ I 4 68 0000000000 DC~L bwl IN 6~496 O0 000 O0 0 3 ! 1 4 68 0000000000 DPMT Lwt PU 618996 O0 000 O0 0 3 I ! 4 68 0000000000 TMDH LW1 PU 61~996 O0 000 O0 0 3 I I 4 68 0000000000 AT~ LW1 0~ 61~9~6 O0 000 O0 0 3 1 ! 4 68 0000000000 PS~ bWl OHM~ 618946 O0 000 O0 0 3 I 1 4 68 0000000000 ROPF LW1 F/H~ 61~998 O0 O00 O0 0 3 ! I 4 6~ 0000000000 G~ bWl GAPI 618996 O0 000 O0 0 3 1 1 4 68 0000000000 H~ bW! CPS 618996 O0 000 O0 0 3 1 I 4 68 0000000000 ~FFA hW'! CPS 618996 O0 000 O0 0 3 ! 1 4 68 0000000000 TAB LWI 618996 O0 000 O0 0 3 1 ! 4 68 0000000000 ~ARD LW! 618996 O0 000 O0 O 3 1 1 4 68 0000000000 N~I LW! 618996 00 000 O0 0 3 I ! 4 68 0000000000 R~! LWI 618996 O0 000 O0 0 3 ! I 4 68 0000000000 DATA ** DEPT 10I'51.500 ~HO)~ LWl -999o~50 DR.O.b%i! -999.~50 PEF.bW1 DCAL~LWI 999'250 ~PHi.~LW1 -999 250 TNDH,bWI -999'250 ~TR,LW1 PS~..bwl 22999'250 ROPE.LWl 85~710 GR.LWl 999.~50 HENA.bWl H~F~,LW~. 999,250 T~B,LWl -999 250 TABO,hW~ ~999.250 NSI,LW! DKPT, 10000,000 RHOB.LWl 2,459 DPHO.LW1 0.0!7 PEF,LWI DCAL,LW1 0,0?2 DP~I,LWl 11,600 TNPH.LW1 40,000 ATR,LWI DS~.LW1 2,485 ROPEoLW~ lll,lll GR,LW1 !12.878 HMN~,LWI H~FA.Lw! 5,463 T~B,LW1 0,547 TABO.LWl ~.557 N$!,LW! RST.!.,W! -~0,300 DEPT. 9500,000 RHOB,LW1 2.385 DR~O,LW1 -0.018 PEF.LWI DmAL.bWl 0,287 DPHI,LW1 I6.000 TNP~.bW1 38.900 ATR.LW1 nS~.bWl 4.252 ROPE,LW1 217,686 GR,LW1 163,381 HEMA.LW! HEVa.LWI 5,780 TAB,LW1 0.344 TABO,LW1 0.908 NSI.LW1 ~ST.LW1 -10,400 D~PT, 9000,000 RHOB.LWl 2,28g DRHO.bWI =0.015 PEF.LWl DCAL.LW1 0,014 DPHIoLWI 2l,o00 TNPH,LW! 45.000 ATR.LW! PS~,Lw1 5,776 ~OPE.LWl 159.291 GR.LWi 10g.199 HEMA.LW1 HFFa.LW]. 5,273 TaB,LWI 0,342 TABD.LWl 0.u44 NSI.Lw! -999 250 -999,250 -999,250 4.67] 2,103 271,500 -10.300 3.821 2,986 267.250 541,600 4,790 2,768 277.750 489.300 LIS Taae Verif{cat{on bisting Schlumberger AlasKa Computing Center gST.bW! 497,700 DEPT. 8500.000 DCAL,LWi 0,000 H~F~,LWt 6,503 TAB.~W! ~S!..LWl -!.0,500 D~PT, 8000,000 DCAL,LW! 0 ~35~ DP~I.LW! PSR'LW! 2 804 ROPE.LW! HEF~,LWJ. 5,'7~5 TAB.LW~ 9$I.Lw1 -~,0,500 DEPT. 7500.000 RHOB,bW! DC~L,SWI 0'264 DP~I-LW! P$~.Sw! ~,548 ROPE'bW! HEF~,LW~ 6.0~3 TAB,bW! R$I.LW1 37~'800 D~PT. 7000,000 DCAL.LW1 0,079 PS~..LWI 3,375 ROPE,LW1 NFF~.LWl 5,863 TAB'LW! ~$I.LW! -10,600 DEPT. 6500,000 RHOB,LW! 451.4oo DC~L:Sw~ -999.250 DS~.LWI -999.~50 ROPE.LW~ H~F~.bwl 3.733 TAS'bW~ ~ST.LW! -999.250 ** END OF DATA ** **** FTLM FILM NA~E SERVICE VERSION D~TE "~X REC SIZE ~]b~ TYPE L~ST FILE TRAIDER **** EDIT .003 ~S!C 001~07 93/06/ 2 1024 3'JUN-lOg3 08:50 0,606 TABD.LWI 2,420 DRHO,LW! 13.900 T~ ,.NPM,LWl 258.6~1 GR,SW! 0'6 0 TABD'LW! -:186 DRHO.h.'Wt ~ ,000 TNP~.bW'I ! 8.216 GR.Sw1 o. 25 T eU.Uwl 2 . o9 !.8.7 GR',~Wi 24~80 TNPH, .90~ 577 1.403 TABD,LWl -999 250 -999!~50 -099 ~§0 GR,LWI -999.250 -o'oo9 33..100 160'321 ~.485 0.008 35.100 195-15! 1.825 0.:00{ 34'700 80,354 0'592 'o:'o 7 34'800 0 23 -0.011 37.000 fl6,394 !'703 -99~250 1 oo -999.250 -999.250 PEF.LWi ATR.LWi MSI,LW! PEF.LW1 ATR.LWl HENA..LWl ~S~.LW1 PEF.,DW! ATR.LW1 HENA'LW1 NSI-bWl N$I,LWI PEF ATm N$i,LW! PEF W! HENI*LW! PA~E: 12 3.088 2,~69 278'750 -10.600 3.3~0 2.568 258.500 532.000 {.o 4 507.800 2,~89 3, 63 270. ~.327 .938 245.708 393,200 -999,250 '909,250 22!~000 '999,250 LIS Taue Ver{~icetlon b~=st~n Schlumberqer Alas~Ze'Comoutln~ Center FIL~ NA~E : EDIT .004 VER$10~ : OO1A07 VaX REC SIZE : I0~4 FILE TYD~ : hO LASTFIL~ { ~'JU~-1093 08:50 13 EDITED Debth shifted a~d cI~ed curves; all bit runs meroed, D~PTH INC~E~ENT 0,5000 F~LE SUV~A~Y K~U TOOL COD~ STAET D~PTH STOP DEPTH CD~ 6~00.0 10122,0 $ B~SELI~E CURVE FO~ SHIFTS: CURVE S~IFT DATA (~EASURED DEPT~) · ...... ~ASELI~E DEPTH ~w~n DATA SOU~C~ ~RU TOO[, CODE BIT RUN.NO, ~ERG~ TOP ME~G~ B~SE RE~RKS~ THIS WILE CONTAINS HIGH RESOLUTION OEO PROCESSED RE$ISTIVTY DATA. $ [.IS FORMAT DATA ** nATA FO?MAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REP~ CODE VALUE I 66 0 2 66 0 3 73 4 66 $chlt)mberger Alaska Computing Center 993 08 ~ 50 TYPE REPR CODE V~LUE 5 66 8 68 0,5 9 65 FT 1~ 66 !] 66 0 14 65 FT 1~ 66 68 16 66 0 66 SERV [INIT SERVIC~ AP! ~P! API lPI FIbE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CLASS MOD NUMB $~P ELE~ CODE ~ ~~ ooooo ooo ~ ~ ~ ~ ~ oooooooooo oo~o.~ ~~ ooooo ooo ~ ~ ~ ~ ~ oooooooooo oo~o.~ ~~ ooooo ooo ~ ~ ~ ~ ~ oooooooooo oo~o.~ ~o~ooooo ooo ~ ~.~ 4 ~ oooooooooo oo~o.~ ~~ ooooo ooo ~ ~ , 4 ~ oooooooooo 22!o.~ ~o~~oo~o ooo ~ ~ ~ ~ ~ .oooooooooo PAGE~ 14 ** DATA ** DEPT 10119.000 ATPH.O01 1.874 PSPH.O01 ~ PSE~:O01 3.093 ATVR.O01 ~.008 PSV~.O01 ,901. 206 D~P?. 10000.000 ATPH.O01 ~.058 PSPH.O0! 2,466 AT~.O01 PSF~.O01 2,447 ATVR.O01 .083 PSVR,O01 2.497 D~PT. 9500.000 ATPH.O01 3.019 PSP~.O01 4.03~ ATE~.O01 PSE~.O01 4.242 ATVR.O01 3.217 PSVR.OOI 4°362 DEPT. 9000.000 ATPH.00I 4.710 VSPg.001 7.048 ATER.001 PSER.O0! '4.858 ATVR.O01 2.954 PSVR.O01 3.789 D~P?. 8500.000 ATPH.O01 2.698 PSPH.O01 3.277 ATER.O0! PSE~,O01 3.286 ATVR.001 3,06] PSVR.O01 3.892 DEDT 8000.000 ATPH.O01 3.467 PSPH.O01 4.686 ATER.O0! P$~O01 5.6]1 ATVR.O01 4,746 PSVR.OOi 7.424 1,95! 2.045 B,136 3,606 2.703 3.949 Lt'S ?oDe Verification Listl.~ Schlumberger Atas~a Co~putln~ Center D~PT. 7500-000 ATPH"00! ~;Ool 2.393 DEPT. 6500-500 P8~.OOI 4,0~5 ATV~'001 ** END OF DATA ** t.165 4!:97 3,3,1 6571 A T E R . 001. 3 ,.962 PAGE{ 3, :165 4.040 15 FI[,~ NA~E = EDIT .:004 SERVICE : ~LIC DA, T~ : 03 06/ 2 ~AX REC SIZE ~ t:024 FIL~ TYPE : LO LAST FIL~ **** FiLE HEADER **** V~RSIO~ : O0iA07 D~T? ~× ~EC $~z~ : io~4 FiL~ TYPE : LO bAST FILE F!LF HEADER FIL'~ ~'U~BER 5 Curves and lDo header data for each bit. run in seuarate files. BIT RUN NI.J~ER: 1 DEPTH INC~E~ENT: 0.5000 Fl5~ SUMMARY VENDO~ TOOL CODE START DEPTH CD~ 6356.0 $ LOG HEADER DATA DATE LOGGED: $OFTWAmE: SURFACE SOFT~ARE VERSION: DOWNHOLE SOFTWARE VERSI~M: STOP DEPTH :o 03-APR-93 F;~_ST 2.3E V4, OC Schlumberger ~.lasKa Computina Center 3-JUN-~!. 993 08:50 PAGE: OATA TYPE (M~MORY OR REAL-TINE): TOp LOG INTERVAL (FT): ~OTTOM bOG INTERVAL ~IT ~OTATI'NG SPEED gObE INCLINATION TOOL STRING (TOp T© BOTTOm) V~NDOR TOOL COD!E TOOL TYPE CD~ NEUTRON/POROsITY CD~ RESISTIVITY $ OPEN HOLE ~IT SIZE D~ILLE~$ CASING DEPTH (FT): BOREHObE CONDITIONS MUD TYPE: ~UD DE SITY (LB/G) MUD VISCOSITY MUD ~UD CHLORiDeS FLUID LOSS RESISTIVITY (OH~M AT TE~PERAT[JRE PELF) MUD AT MEASURED TEMPEPATURE (MT): gUD AT MAX CIRCULATIMG TEMPERATURE: ~UD FILT~AT~ AT ~T: ~UD CAKE AT NEUTRON TOOL M~TRIX: gATRIX DENSITY: HOLE CORRECTION (IN]: TOOL STANDOFF (I~): ~WR F~EOUENCY (HZ): R~M~RKS: 6488 0 6a 6 :o :1.0!10.0 8.500 6488,0 9,80 3.500 3.480 60,0 60.0 SANDSTONE 2.65 8,500 TMIS FILE INCLUDES SPECIAL 1H-13 LWD INFORkATION AS REQUESTED BY DON WOLCOTT OF ARCO AND STEVE ALLEY OF .hNADRILL, LIS FORMAT DATA LIS TaDe Verification List, in~ SChlu~ber~er Alaska Co~putin~q Center 3-JUN-!993 08:50 SET TYPE 2 6 4 6 5 6 7 7 6 9 6 14 6 15 6 16 6 0 CODE VA hUE 52 1 0,5 FT 19 8 6 0 5 FT 6 68 66 I ID ORD~ DEPT FT 61899 TVD aNA FT Rap ANA ~/HR 61899 ROD5 ANA 61899 SWOB ANA 61~99 STOP ANA ~899 SPD~ A~A PSI 61890 SD~ ANA 61~99 TWL~ A~A GP~ 61~99 GD ANA CPS " CH 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 6 0 ~....o AN · AP 0 0 0 0 0 0 0 0 0 0 0 0 '~'! .... Ap;mmmm~m~m'mmmmmmmlm'mmmmllmmmmmmmm;~m~mmmlmmmm;;~;;mm!ApI rI[.~: NLJ~B NU~8 S ~ REPR TYPE CLASS MOD NUMB SAMP EI~E~ COD~; (HEX) 000 O00 5 I ~ 4 68 0000000000 ooo ooo ~ ~ ~ 4 ~ oooooooooo ooo ooo s ~ ~ 4 ~ oooooooooo 000 O00 5 1 ! 4 68 0000000000 ooo ooo s ~ ~ ~ ~ oooooooooo ooo ooo ~ ~ ~ 4 ~ oooooooooo ooo ooo s ~ ~ ~ ~ oooooooooo ooo ooo ~ ~ ~ ~ ~ oooooooooo ooo ooo s , ~ 4 ~ oooooooooo ooo ooo s ~ , 4 ~ oooooooooo ooo ooo s ~ t ~ ~. oooooooooo ooo ooo s , ~ ~ ~ oooooooooo ooo ~ o s t , ~ ~ ~~2oooo mm~.. ~~J~~m~mm~m~m~ .~mmm ~~ m~mm~m 17 DE:p? 11172.000 TVD.ANA Swo~:ANA 3.020 STOR.ANA TwLO.ANA 247,000 GP.ANA D~V~.A~A 357.000 771.000 ROP.ANA 45.700 ROP5.ANA 16,700 SPDR,ANA 3344.000 SP~.ANA 999.250 CGR.ANA -999.250 DP~.ANA 35.200 57.000 77.000 ;c~lumberoer AlasKa Computing Center DEPT 11000.000 TVD,ANA SWOB!gNA 2.900 STOR.A~A TFLO AMA 247.000 ~R.AMA D~Va.ANA 346.000 DEPT. 10152°000 TVD.ANA SWOB,AM~ 0.Oi0 STOR ANA TWLO.AMA 562.000 ~R:ANA DRV~,ANA '7.000 ** END OF DATA ** 3-JUN-lgg3 08:50 67!3,60! ROP,INA 2~.100 SPPR,A. NA 2 ,400 C~R.ANA 654 ROP,ANA i~.'20o ,70o SPPR.ANA -999,250 CGR'~'NA 6427,400 ROP'ANA 34.500 3510.000 lg. O00 366 -999.250 76.O00 ~609°000 999.250 ROpL..ANA SPM. AN A RP~.ANA RDPL.ANA SPN.ANA RP~.AMA ROpL°ANA $ P M · A N A RPM, ANA PAGE: 18 :27.700 57' ~000 8 ~. 000 23,. 500 57' 000 85.000 90'600 130.000 0,000 **** FILE TRAILER **** FI[,~ NAME ~ EDIT .005 SERVICE : FLIC V~R$ION : 001AO7 DATE i 93/06/ ~ ~AX REC,SIZ~ : I0~4 FiL~ TYPE : LO LAST FILE : **** TAPE TRAILER **** $~RVICE N~M : EDIT D!TE O~I~IN : FLOC TAD~ NAME : g3155 CONTINUATION # PREVIOUS TAPE C~ENT : ARCO ALASKA, INC., KUPARUK RIVER UNIT, iH-13, 50-029-22356-00 **** REEL TRAILER **** SERVICE M~MM : EDIT DATE ~ 031061 2 OPI~IN ~ FLIC REEL NAME : 93155 CONTINUATION # : PREVIOUS ~EEL : CO~ENT : ARCO ALASKa, INC., KUPA~U~ ~IVFR UNIT, 1~-~3, 50-0~9-22356-00