Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout182-160Originated: Delivered to:19-Feb-25Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#1 1A-20 50-029-22112-00 909816966 Kuparuk River Leak Detect Log Field- Final 23-Jan-25 0 12 1A-20 50-029-22112-00 909816966 Kuparuk River Multi Finger Caliper Field & Processed 22-Jan-25 0 13 1A-20 50-029-22112-00 909816966 Kuparuk River Plug Setting Record Field- Final 22-Jan-25 0 14 1D-38 50-029-22961-00 909594223 Kuparuk River Multi Finger Caliper Field & Processed 16-Jan-25 0 15 1E-17 50-029-20793-00 909817737 Kuparuk River Plug Setting Record Field- Final 4-Feb-25 0 16 1E-22 50-029-20884-00 909817740 Kuparuk River Multi Finger Caliper Field & Processed 2-Feb-25 0 17 1E-22 50-029-20884-00 909817740 Kuparuk River Plug Setting Record Field- Final 3-Feb-25 0 18 1H-01 50-029-22330-00 909817089 Kuparuk River Multi Finger Caliper Field & Processed 7-Feb-25 0 19 1H-01 50-029-22330-00 909817089 Kuparuk River Plug Setting Record Field- Final 7-Feb-25 0 110 1H-110 50-029-23601-00 909817451 Kuparuk River Plug Setting Record Field- Final 24-Jan-25 0 1PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:T40111T40111T40111T40112T40113T40114T40114T40115T40115T40116190-162200-077182-116182-214193-006218-0312/20/2025Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.02.20 11:39:57 -09'00'1E-1750-029-20793-00 909817737Kuparuk RiverPlug Setting RecordField- Final4-Feb-2501T40113182-116
PLUGGI-N~~& LOCATION CLEA~C~ R~PORT
State of Alaska
Review the well file, and' c~m~en= on plugging, well head
suatus, and location clearance - orovide loc. clear, code._
Well head eat off:
Hark.r 'posC or plata: .~~
Code
STATE OF ALASKA
ALASK~I,L AND GAS CONSERVATION COMMAS ON
WELL COM:~ ~TION OR RECOMPLETION REPORT'~,D LOG
Plugged back for CT sidetrack
1. Status of Well Classification of Service Well
r-] Oil i---] Gas I--] Suspended [~] Abandoned [--] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 82-160
3. Address 8. APl Number
P.O. Box196612, Anchorage, Alaska 99519-6612 50-029-20834
4. Location of well at surface 9. Unit or Lease Name
·
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM iil, O¢,~'ll01~ Prudhoe Bay Unit
At top of productive interval ~ 10. Well Number
1724' SNL, 4081' WEL, Sec. 30, T11 N, R14E, UPM~ C-26
At total depth 11. Field and Pool
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM . . Prudhoe Bay Field/Prudhoe Bay
51 EleVation in"ieet (indicate ~B','"DF, etc'ii "'1'6. Lease Desi~ation and Serial No. Pool
KBE = 71.71 AMSLI ADL 28310
"1'2. Date Spudded10-17-82 l13' Date T'D' Reached J 14' Date C°mp" Susp" °r Aband'l15' Water depth' if OffshOre ' 16' NO' of COmpletiOnsl 1-1-82 8/5/98 N/A MSLI Zero
17. Total Depth (MD+TVD) !18. Plug Back Depth (MD+TVD)119. Directional SurveyI 20. Depth where SSSV set~l. Thickness of Permafrosl
11915 . BKB F~I 11500 FTI l--lYes I--1NoI 1982 MD! 1900'(Approx.)
22. Type Electric or Other Logs Run
23. CASING~ LINER AND CEMENTING RECORD
CASING SEI-rlNG DEPTH ,, HOLE
SIZE WT. PER FT. GRADE TOP ' BOTTOM ...... S!Z,,E CEMENTING RECORD AMOUNT PULLED
20x30 Insulated Conductor Surface 143 36" E~ c.yo
13-3/8" 72# L-80 Surface 2722 17 1/2" 3939 c.f.
, ,,
9-5/8" 47# L-80 Surface 10959 12-1/4" 1697 c.f.
7" 26# L-80 10699 11915 8-1/2" 360 c.f.
~_4. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None, Not on Production 4-1/2", 12.6#, L-80 11620 9 5/8" @ 10653
MD TVD 7" @ 11610
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL'(MD) AMOUNT & KIND OF MATERIAL USED
11,915-11,500 112 c.f. Class G cmt'
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
Not on pro. duction I N/A
Date of Test Hours Tested PRODUCTION OIL~BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
FOR TEST ·
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL O~L GRAWTY-API (CORR)
·
Press. ~4-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
J' Geologic Markeri""""' 30. -~"'~.ormation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Sag R 11018 8402
Shublik 11045 8425
Ivishak 11145 8509
,
31. List of Attachments
Summary of Daily Reports,
3'2.
I here~y ce~y that the fore~;i'ng 'i~ t~ue and correct to the best of my knowledge
Signed ~,sj~,~. ~ Title Coiled Tubin~l Drillin~ TA Date {1:::,) {~/~
Prepared By Name/Number: Theresa Mi/Is 564-5894
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases
in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply
for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on
this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
C-26
Cement Plug,
Daily Operations
8~4~98
MIRU SWS//8317 Palmer. RIH w/CIPB setting tool-CCL. Tie into Ti'. Set BP. Top at 11530. Tagged after
OK. Flag line. POOH. Bleed WHP to LDF, PT IBP and tbg to 2000 psi. Passed. Punch 16 holes in tubing
from 11,157 to 11161 MD. Injectivity 5.5 BPM @ 1000//. POOH. RDMO
815198
Rih w/3" combo nozzle. Tag plug and correct to plug at 11,530'. Load backside with 65 bbls diesel (which
puts a total of 141 bbls including previous days diesel). Injection rate was 4.0 bpm @ 920 psi. Park coil at
11,000' and bull head 20 bbls class "G" cement. Squeeze pressure got up to 1500 psi at end of job, shut
down and wait 20 rain w/1000 psi to let cement develop gel strength. Drop ball and circulate to nozzle;
cement plug is holding tight. Jet through cement left in tubing from 11,157 to plug at 11,530 with biozan
contaminate. Jet max over whipstock setting interval 11,260 - 11,320 and through jewelry and gas lift
mandrel, and then again at tree and bops. Rih and freeze protected well to 2000' with mech. Plan to
pressure test after woo time.
8~6~98
Pressure test tubing to 1500 PSI. Good test and tagged TD @ 11500' w/3,625" x 20' dummy whipstock and
3.75" swedge. No state Witness. Waived by John Spaulding
8/7198
MIRU SWS, and Baker. Calibrate Packer and Orientation Tool. Packer Rotates WITH Orientation Tool as a
Single Piece / Not Independently. RIH w/Orientation Tool and Packer. Tie in and Set TOPaoker @ 11,294'
MD - Oriented 65 Degrees Highside (65 Degrees Left from the Top). Slack Weight and Confirm TOPacker
Depth @ 11,294' MD. POOH. RIH w/SWS Oriented Dummy Whipstock Stinger. Sat Down 4 Times and
Confirmed TOPacker @ 11,294' MD and Oriented 65 Degrees Highside. POOH. CCH. Brass Tattle Tail in
Key Slot Missing Confirming Stinger Fully Engaged w/Packer and Orienting Key. RDMO.
Cement Detail
15.8 PPG Class G Cement containing:
0.47 % BWOC D156
0.48 %BWOC D065
0.22 % BWOCD800
Thickening Time = 4 hrs and 49 rains.
Lab APl fluid Loss = 104 mi @ 170 o F.
Requested 90-110 mi., .100 cc target
Requested 3-5 hours
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO, Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: July 28, 1998
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Blair Wondzell
Sr. Reservoir Engineer
Re:
Well C-26 Prep for CT Sidetrack
Well C-26 is scheduled for a through tubing sidetrack to be drilled with
coiled tubing. The following summarizes the procedure required to
prepare C-26 for sidetracking and is submitted as an attachment to
Form 10-403. Schematic diagrams of the proposed cement squeeze
and sidetrack completion are attached.
1. A tubing integrity test has been successfully performed.
2. Tubing and liner have been drifted with a 3.65" OD drift.
3. Kinley caliper has been run over the proposed whipstock interval to
confirm tubing condition.
4. A bridge plug will be set at approx. 11,460' and pressure tested.
5. The straddle will be punched at approx. 11,200' to enable cement
to be downsqueezed to the annulus.
6. Service coil will be used to downsqueeze cement to abandon
existing perforations and to cement the 4 W' x 7" annulus to
facilitate milling through two strings of pipe. Approx. 20 bbls
cement will be used. A 1500 psi pressure test will be performed
with AOGCC witness prior to setting the whipstock and milling the
window.
7. A mechanical whipstock will be set on e-line at approx. 11,270'.
8. Milling through the 4 %" and 7" strings will be done with drilling coil.
Ted Stagg
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
STATE OF ALASKA "-%
ALAo~? OIL AND GAS CONSERVATION CON,. ,SSION
APPLICATION FOR SUNDRY APPROVAI~
Plug back for CT sidetrack
1 Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
· [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724' SNL, 4081' WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1994' SNL, 4295' WEL, Sec. 30, T11 N, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11 N, R14E, UPM
Type of well:
Development [] Service
Exploratory
Stratigraphic
.
Datum Elevation (DF or KB)
KBE = 71.71 AMSL
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
C-26
9. Permit Number
82-160
10. APl Number
50- 029-20834
11. Field and Pool
Prudhoe Bay Field/Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 11915 feet
true vertical BKB 9257 feet
Effective depth: measured 11837 feet
-~ true vertical 9238 feet
Plugs (measured)
Junk (measured)
ORtGiI AL
Casing
Length Size
Structural
Conductor 110 20x30
Surface 2689 13-3/8"
Intermediate 10926 9-5/8"
Production
Liner 1216 7"
Cemented
8 c.y.
3939 c.f.
1697 c.f.
360 c.f.
MD TVD
143 143
2722 2678
10959 8426
10699-11915 8218-9257
Perforation depth:
measured
true vertical
11621 '-11628', 11644'-11672'
(subsea) 8995'-9040' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
RECEIVED
JUL 28 1998
Alaska Oil & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 10653', 7" Baker packer at 11610'; 4 1/2" SSSV at 1982'
13. Attachments [] Description summary of proposal [] Detailed operations program [--~ BOP sketch
14. Estimated date for commencing operation
8/1/98
16. If proposal was verbally approved
Name of apl)rover Date approvec
Contact Engineer Name/Number: Ted Stagg 564-4694
15. Status of well classifications as:
[~ Oil [] Gas I--[ Suspended
Service
Prepared By Name/Number: Theresa Mills 564-5894
17. I hereby certify that the for?going is true and correct to the best of my knowledge
Signed %-~~-~¢
TedStaqcl ~'/' '[ Q~'~ '~, ".-r~[,~ Title Coiled Tubing Drilling Engineer
~' /~ Commission Use Only
I Approval No.~~'~
Conditions of Approval: Notify Commission so representative ~a~y,,~itness
Plug integrity ,? BOP Test ~ Location clearance __
Mechanical Integrity Test__ Subsequent form required 10-
ORIGINAL SIGNED BY 009~
Approved by order of the Commission Rnhert N_ (~hdstensort .,e(~ ..~ _ .Commissioner
Form 10-403 Rev. 06/15/88 . ~,~- "1~{~,'~I ~ ~T'~i~~'~/~ J~
Date
Submit In Triplicate
,LHEAD:
)R:
4" FMC
McEVOY
BAKER
G-26a Proposed Cement Squ,.,=Ze
KB. ELEV = 71.71'
BF. ELEV = 38.81'
;SV LANDING NIPPLE I
OTIS )(3.813" ID) 1983'
13-3/8", 72#/ft,
L-80, BTRS.
12.722' I
FOC
KOP: 1500'
MAX ANGLE: 53° @ 7000'
4-1/2", 12.6#/ft, L-80,
BTRS TUBING
TUBING ID: 3.958"
CAPACITY: .01522 BBL/FT
GAS LIFT MANDRELS
(OTIS w/RA LATCH)
No MD(BKB) TVDss
,,,,
I 3195' 3047'
PERFORATION SUMMARY
REF LOG: SWS - BHCS- 11-02-2
SIZE SPF INTERVAL O:~EN/SQZ'D
2 1/8" 8 11,474 -11,514' SQZD/
2 1/8" 4 11,570 -11,598' SQZD/
ABO /E SC: 7D PERFS BEHIN ) STRADDLE
3 3~8" 6 11,590 -11,600' Open/4-28-93
3 3~8" 4 11,616 - 11,620 OPEN/4-12-93
3 3~8" 8 11,620 -11,628' OPEN/4-12-93
3 3~8" 4 11,634 - 11,640 OPEN/4-12-93
2 1/8" 4 11,640 -11,644' SQZD/6-4-89
3 3~8" 4 11,644 -11,672' OPEN/6-30-89
Tubing to be punched for cmt. squeeze
Bridge Plug to be set prior to squeeze
7" BAKER PACKER
(SAB w/"K" ANCHOR
(4.000" ID)
4 1/2 .... XN" NIPPLE
(OTIS) (3.725" ID)
4 1/2" TBG TAIL (VVLEG)
(ELMD)
1,618'
111,626'
I1't,629' I
111,62o'1
4 1/2 .... X" NIPPLE
(OTIS) (3.813" ID)
110,610'
BAKER PBR SEAL ASSY.I 10,631'
9 5/8" BAKER PACKER I 10,653' I
(HB) (4.000"ID)
4 1/2", 12.6~/ft, L-80 TAILPIPE
p 7" liner I1°,699 I
9-5/8", 47#/ft, L-80, BTRS I10,9S9'
Cement to be squeezed
through holes punched
in the 4.5" straddle
prior to setting
whipstock and milling
window through 4 1/2"
and 7" strings.
NOTE: PERFS From 11,590-11,600' and
11,616-11,620 FT BKB WERE SHOT THRU
THE 4.5" TAILPIPE
FISH: FINGER OFF OF TEL LOST 8-17-90
(4"L x 1 1/2"W x 3~8" T)
FISH: I 1/2" OD DGLV DROPPED 6-22-89
~11,830' WLM OR DEEPER.
PBTD ~
7",26#/ft, L-80, IJ4S
STATE OF ALASKA ~
AL, ,A OIL AND GAS CONSERVATION COMMIS, J
REPORT OF SUNDRY WELL OPERATIONS
.. Operations performed: Operation shutdown Stimulate . Plugging..
Pull tubing Alter casing Repair well
Perforate x
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
1645' SNL, 1032'WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724' SNL, 4081' WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1994' SNL, 4295' WEL, Sec. 30, T11N, R14E, UMI
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
6. Datum elevation (DF o[.~/~
KBE = 71.71 AJ~SZ._feet
7. Unit or Property name '~,,
Prudhoe Bay Unit ~
8. Well number
C-26 (12-30-11-14) PBU
9. Permit number/approval number
82-160 /
10. APl number
50- 029-20834
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured 11915 feet Plugs (measured)
true vertical BKB 9257 feet
Effective depth: measured 11837 feet Junk (measured)
true vertical 9238 feet
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20x30 8 c. y. 143
S u dace 2689 13 3/8 3939 c.f. 2 722
I nte rm ed iate 10926 9 5/8 169 7 c.f. 10959
Production --
Liner 1216 7 360 c.f. 10699-11915
Perforation depth: measured 11621'-11628', 11644'-11672'
True vertical depth
BKB
143
2678
8426
8218-9257
true vertical (subsea)
8995'-9040' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
Packers and SSSV (type and measured depth)
,,
13. Stimulation or cement squeeze summary see attachment
14.
9 5/8" Bakerpacker at 10653', 7" Bakerpacker at 11610'; 4 1/2" SSSVat 1962'
Intervals treated (measured)
Treatment description including volumes Used and final pressure
Reoresentative Daily Aver~,ge Prgduction or In!ection Data
RECEIVED
DEC - 9 199,t
Ud & Oas ~ns. Commission
~florage
Prior to well operation
Subsequent to operation
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
SI
671 ~ 19242 2018 0 705
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil ~ Gas Suspended
Service
17. I hereby ~ertify that the foregoip~ is true and correct to the best of my knowledge.
Signed(~/~ ~/~, ~//~ .~//~~ Title SeniorTechnicalAssistantl
Form 10-404~ Rev 06/1~/88 /
SUBMIT IN DLHSLi(~A'~E~
4/11/93
WELL C-26(12-30-11-14)
Added Perforation
The following interval were reperforated using 3 3/8"
guns, 4 SPF, 45 orientation and 90° phasing.
11616'- 11628' MD
11634' - 11640' MD
4/28/93
The following interval were reperforated using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
11590' - 11600' MD
fjh
11/18/93
RECEIVED
DEC - 9 199~t
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 05/04/93
T# 84544
BP/PBU CH LOGS
Enclosed is your copy of the materials listed
questions, please contact BP Well Records at
~| ~-li ,z,. INJ/TEMP
~A-32 9~'~0LEAK DET
i~B-34~,~TGAS LIFT SURVEY
~B-341 --' PROD-F
~C-08 ~7~°~PRODUCTION LOG
'"C-ii 7~.~ PRODUCTION LOG
'
g-027~.~ ~RODUC~O~ hOG
H-19 ~2-~I3PRODUCTION LOG
H-20~.~7 PDK-100
04/29/93 #1
04/21/93 #1
04/28/93 #1
04/27/93 #1
04/27/93 #1
04/30/93 #1
04/30/93 #1
04/28/93 #1
04/28/92 #1
04/28/93 #1
04/23/93 #1
04/27/93 #1
04/23/93 #1
05/01/93 #1
04/29/93 #1
Information Control
Well Records
below. If you have any
(907) 564-4004.
9350.00-10062.00.ATLAS 5 "
2200.00-10332.00 ATLAS 2+5"
11414.00-11768.00 ATLAS 5 "
11500.00-12054.00 ATLAS 5 "
11500.00-12054.00 ATLAS 5 "
9800.00-10232.00 ATLAS 5 "
9500.00- 9970.00 ATLAS 5 "
1'1500.00-11680.00 ATLAS 5 "
9600.00- 9994.00 ATLAS 5 "
11950.00-12214.00 ATLAS 5 "
9350.00- 9590.00 ATLAS 5 "
11100.00-11525.00 ATLAS 5 "
9600.00-10225.00 ATLAS 5 "
9500.00- 9842.00 ATLAS 5 "
10230.00-10511.00 ATLAS 5 "
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
BP/PBU ~. OGS
DATE: 04/21/93
T9 84491
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
~A-043~'O~ PFC 04/07/93 91
-~ A-23 _ ~O PDK-100 04/06/93 91
~# A-24~-~ PFC 04/04/93 91
~,~ B-07 j\~ PFC 04/17/93 91
B-15~~ - PRODUCTION LOG 04/16/93 91
B-34~'~ PFC 04/15/93 91
~-26 ~\~ PFC 04/11/93 91
~o-1~ P~C '0~/12/93
~\,~E-i~o~ PRODUCTION LOG 04/17/93 91
E-1 PRODUCTION LOG 04/14/93 91
F-I~~' CCL/PERF 04/06/93
~H-17 PFC 04/13/93 #1
%~ H-2~b'~ PFC 04/06/93 91
~%.~.~Z15 .~ LEAK DET 04/15/93
: 15~~ PRODUCTION LOG 04/04/93
~.~-35~ P~C 04/0~/~3
o ucT o.
P O UC ,O.
10500.00-10893.00 ATLAS 5 "
11050.00-11495.00 ATLAS 5 "
10754.00-11037.00 ATLAS 5 "
11550.00-11800.00 ATLAS 5 "
9180.00- 9450.00 ATLAS 5 "
11600.00-11950.00 ATLAS 5 "
11371.00-1].795.00 ATLAS 5 "
8700.00- 9200.00 ATLAS 5 "
11450.00-11694.00 ATLAS 5 "
10350.00-10705.00 ATLAS 5 "
9985.00-10240.00 ATLAS 5 "
10280.00-10670.00 ATLAS 5 "
9604.00- 9920.00 ATLAS 5 "
11000.00-11500.00 ATLAS 5 "
3000.00-11610.00 ATLAS 5 "
9600.00- 9900.00 ATLAS 5 "
9500.00- 9920.00 ATLAS 5 "
9930.00-10320.00 ATLAS 5 "
'2200.00-10280.00 ATLAS 5 "
Information Control~ O~
Well~~~Records %
t'"-, STATE OF ALASKA
A, ,,<AOILAND GAS CONSERVATION COMMIL >N 0
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate × Plugging ...
Pull tubing , Alter casing ~ Repair well .
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development ~
Exploratory
Stratigraphic ,,
Service
4. Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval RECEIVED
1724' SNL, 4081' WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1994'SNL, 4295'EEL, Sec. 30, T11N, R14E, UMI OCT -
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM Alaska 0il & Gas Cons. 60mm'tss~O~
2. present welI cOnditiOn summary ..........
Total depth: measured 11915feet Plugs (measured)
true vertical BKB 9257feet
Perforate
Other__
6. Datum elevation (DF or KB)
KBE,, 71.71 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
C-26 (12-30-11-14) PBU
9. ~ermit number/approval number
82-160/
10. APl number
50- 029-20834
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11837feet Junk (measured)
true vertical 9238feet
Casing Length Size Cemented Measured depth True vertical depth
Structural -- BKB
Conductor 110 20x30 8 c.y. 143 143
S u trace 2689 13 3/8 3939 c, f. 2722 2678
Intermediate 10926 9 5/8 1697 c.f. 10959 8426
Production --
Liner 1216 7 360 c.f. 10699-11915 8218-9257
Perforation depth: measured 11621'-11628', 11644'-11672'
true vertical (subsea)
8995'-9040' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 10653', 7" Baker packer at 11610'; 4 1/2" SSSV at 1982'
13. Stimulation or cement squeeze summary 11/09/91 Matrix MudAcid
Intervals treated (measured) 11621'-11628', 11644'-11668',11668'-11672'
72 BBLS 15% HCL, 144 BBLS 12% HCL-3% HF MUD ACID, 144
Treatment description including volumes used and final pressure BBLS Ammonium Chloride, 180 BBLS SeaWater, 400 GALS
Diverter Solution
14.
_Repre~ef~tative Dai.ly.Average Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 0 0 0 0 0
Subsequent to operation
0 0 0 0 0
15. Attachments I 16. Status of well classification as:
Copies of Logs and Surveys run
I
Daily Report of Well Operations.. Oil X . Gas Suspended
......... true and corre~ t° the besi of my knowledge.
17. ! hereby cf~rtify that th_e foreg¢,o~ is
Signed ~ A~ ~--.~/ ~)~'F~/~ Title Senior TochnicalAssistantl
,~ -
Form 10-404 Rev 06/15/88 / -- '
Service
SUBMIT IN DUPLICATE
STATE OF ALASKA "-" 0 R !
~ OIL AND GAS CONSERVATION COMMIS~,.3N
REPORT OF SUNDRY WELL OPERATIONS
1. OPerations performed: Operation shutdown
Pull tubing
2. N~me of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
Stimulate Plugg'ing
Alter casing Repair well 5. Type of Well:
Slraligraphlc .
" Perforate,
Other x
1646' SNI., 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'$N1., 4081'WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1994' $NI., 4295' WEL, Sec. 30, T11N, RI 4E, UMI
At total depth
2022' $NL, 4293' WEL, Sec. 30, T11N, R14E, UPM
12. Prss~nt well condition summary
Total depth: measured 11915feet
true vertical BKB 9257feet
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 7!~.71 AMSL feet
7. unit or Property name
Prudhoe Bay Unit
Effective depth: measured 11837feet
true vertical 9238feet
Junk (measured)
Casing Length
Structural --
Conductor 110
Surface 2689
Intermediate 10926
Production -
Liner 1216
Perforation depth: measured
size
8. Well number
C-26 (12-30-11.14) PBU
20x30
133/8
95/8.
9. Permit number/approval number
82-160 / 8.6~1
10. APl number
50- 029-20834
11. Field/Pool
Prudhoe Oil Pool
Cemented Measured depth True vertical depth
BKB
8 c.y. 143 143
3939 c.f. 2722 2678
1697 c.f. 10959 8426
7 360 c.f. 10699-11915 8218-9257
11621;11628', 11644; 11672'
true vertical (subsea)
8995'-g040' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2' L-80 to 11620'
Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 10653', 7" Baker packer at 11610'; 4 1/2" SSSV at 1982'
.........,.,...r.. RECEIVED
Intervals treated (measured)
Treatment description including volumes used and final pressure OCT 1 0 19~J~
[=le0. resentative Daily Averaae Production or Iniection_ Data
OiI-Bbl Ga~-I~ - Water-Bbl Ca~ing Pre.ute gnol~ Pre~ure
13. Stimulation or cement squeeze summary
Prior to well operation 0 0 0 0 0
14.
Subsequent to operation
0 0 0 0 0
Service
Date /'0-~_- ~;;~
SUBMIT IN DUPLICATE
I15. Attachments ' J 16. Status of well classification as:
Copies of Logs and Surveys run
I
Daily Repoj~ of Well Operations X Oil X Gas . Suspended
H
· ,,., ,,.,..,=,,, t,',. ,,..., o, ,',,, ,,,',ow,,,,,,,..
Supervisor GravityDrainage
Form 10-404 Rev 06/1¢/1~8
/
WELL C-26 {12-30-11-14t PBU
STIMULATION OPERATION
We mud acid stimulated the following additional intervals dudng August 1990:
11621'- 11628' MD BKB
1. Pulled SSSV. Gauged hole and tag TD.
2. Ran and installed an inflatable bridge plug (IBP) in the bank interval from 11628 to 11644 MD to
isolate the lower perforation interval/channel from the planned stimulation fluids.
3. Nitrogen lifted well to bring on line.
4. Recovered bridge plug and left rubber element in hole.
5. Attempts to return well to production failed.
mr:10/2/90
~"'"" STATE OF ALASKA
AL._.,4A OIL AND GAS CONSERVATION COMMIS~,JN
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ~ Suspend __
Alter casing Repair well~
Change approved program __
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519,6612
operation Shutdown ~
Plugging
Pull tubing ~ Variance ~
5. Type of Well:
Development x
Exploratory ~
Stratigraphic ~
Service
4. Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'SNL, 4081'WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1994' SNL, 4295'WEL, Sec. 30, T11N, R14E, UMI
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured 11915 feet
true vertical BKB 9257 feet
Re-enter suspended well~
Time extension . Stimulate ~
Perforate Other x
6. Datum elevation (DF or KB)
KBE= 71.71 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
C-26 (12.30-11-14) PBU
9. Permit number
82-160
10. APl number
50- 029-20834
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 11837 feet
true vertical 9238 feet
Junk (measured)
Casing Length
Structural --
Conductor 110
Surface 2689
Intermediate 10926
Production --
Liner 1216
Perforation depth: measured
Size Cemented Measured depth True vertical depth
BKB
20x30 8 c.y. 143 143
13 3/8 3939 c.f. 2722 2678
9 5/8 1697 c.f. 10959 8426
7
11621'- 11628', 11644'- 11672'
360 c.f. 10699-11915
true vertical (subsea)
8995'-9040' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
RECEIVED
Gas Cons. C0mmJsd0r
: ~ch0ra[~
8218-9257
Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 10653', 7" Baker packer at 11610~ 4 1/2" SSS V at 1982'
13. Attachments Description summary of proposal X Detailed operations program
BOP sketch
14. Estimated date for commencing operation
August 1990
16. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
17. I hereby/(~rtify that the for~,oing is true and correct to the best of my knowledge.
signed ~ Title Supervisor Gravity Drainage
/
15. Status of well classification as:
Suspended~
FOR COMMISSION USE ONLY
Conditions. of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~
Mechanical Integrity Test~
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Location clearance
Subsequent form required, lo-
c.
AgPr°ved ~oP3' SUBMIT IN TRIPLICATE
WELL C-26 (12-30-11-14) PBU
STIMULATION PROPOSAL
We propose to stimulate the following additional intervals during August 1990:
11621'- 11628' MD BKB
There will be 1250 gals of 6% HCL/1,5% HF mud acid used to clean up the well. The well will be placed on
production immediately following stimulating operations, then tested.
RECEIVED
'AUG 1 ~ ]990
Alasl<a 0il & 6as Cons. c0mmiss]o~
Anchoraff~
mr:8/13/90
BOP sTACK
.. o
.
KILL LINE
CONNECTION
F
t I
INJECTOR HEAD
OFF
,.
QUICK UNION
"j..--- BLIND SHEARS
BLIND SHEARS
I"' WHP SENSOR
...~ PIPE SLIPS
"~..-- · PIPE"RAMS ..........
FLANGED CONNECTION
SWAB VALVE
TYPICAL CTU STACK
FORM 1481 51'10189 ~,
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
April 18, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V, Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
You_~_s very truly, '
R. B. Frazier
Supervisor,Gravity Drainage
RBF:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
STATE OF ALASKA
REPOR^''''TOF° [ SUNDRY AND GAS CONSERVATION WELL COMM, OPERATIONS *" ¢
1. Operations performed: Operation shutdown
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99,519-6612
4. Location of well at surface '
1645'SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'SNL, 4081'WEL, Sec. 30, T11N, R14E, UPM
At effective depth
1993'SNL, 4275'WEL, Sec. 30, T11N, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
12, Present well condition summary
Total depth: measured 11915feet
true vertical BKB 9257feet
Stimulate Plugging
Repair well
5. Type of Well:
Development X
Exploratory
Stratlgraphic
Service
Plugs (measured)
Perforate X
Other
6, Datum elevation (DF or KB)
KBE, 71.71 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
C-26 (12-30.11.14) PBU
9. Permit number/approval number
82-160/90.122
'10. APl number '
50- 029-2O834
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11839 feet
true vertical 9189feet
Junk (measured) fill at 11839'MD (03/90)
Casing Length Size Cemented
Structural --
Conductor 110 20x30 8 c.y.
Surface 2689 13 3/8 3939 c.f.
Intermediate 10926 9 5/8 1697 c.f.
Production --
Liner 1216 7 360 c.f.
Perforation depth: measured 11621'-11628', 11644'-11672'
Measured depth True vertical depth
BKB
143 143
2722 2678
1O959 8426
10699-11915 8218-9257
Sqzd: 11474'.11514', 11570'-11598',
11640'-11644'
true vertical (subsea)
8923'-8969' (two intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
Packers and SSSV (type and measured depth)
13, Stimulation or cement squeeze summary
9 5/8" Bakerpacker at 10653', 7" Bakerpacker at 11610'; 4 1/2" SSSV at 1982'
n
I\l.,~..I-I · ~-~
14.
Intervals treated (measured) 'AJ;)R 2 0 1990
Treatment description including volumes used and final pressure ~a8~3 0ii & Gas Cons. Commission
'Apch0Fao8
Reoresentativo Oailv Average Production or Inioction Oata
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 1650 11507 164 0 2000
Subsequent to operation 3692 24096 365 0
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
,,,
Daily Report of Well Operations X Oil X Gas . Suspended
17. I hereb~hrtify t~hat t.he_z~regq11)g istrue'and correct to the best of my knowledge.
Sicjned ~'~,b~vut~ Z~/. ~i~.~/i~ Title Supervisor Gravity Drainage
Form 10-404 Rev 06/t5/88 "
1708
Service
SUBMIT IN DUPLICATE
W~LL C-2§ (12.30-11-14~ PBU
ADDtL. PERFORATION OPERATION8
The following additional interval was perforated March 16, 1990, using Schlumberger
3 3/8" carrier guns at 4 spf:
11621'- 11628'MD BKB
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to production immediately follOwing perforating operations, then tested.
jm
4/16/90
BP EXPLORATION
BP Ex,/oration (Alaska) Inc.
900 ~asr gen$on goulevarct
P.O, Box 196612
Anchorage. Alaska 99519-6612
(90;,) 56~-5m
Distribution
Date: 03/20/90
Transmittal: 80946
~ro~:
Information Coatrol
Well Records LR2-1
Subject:
Enclosed is yOur
questions, please
C-23
N-21 TDT_p
PERF
copy of the material listed below. If you have any
contact BP Well Records at (907) 564-4445.
03/16/90 #1 9825-10167 Sch
03/16/90 #1 11550-11826 Sch 5"
03/15/90 #1 10000-10748 Sch 5"
03/17/90 #1 10950-11276 Sch 5"
Distribution:
ARCO
CHEVRON
~EO~c~EHCES
MOBIL
PHILLIPs
RESERVOIR_
IVES
RECEIV D
E
Alaska Oil & Gas Cons. Commissi~
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
February 26, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal
to perforate the well.
Yours very truly,
R. B. Frazier
Supervisor Gravity Drainage
RB~: JAM
Enclosures (9)
cc:
L. Burke (MB12-1)
Well File
RECEIVED
FEB 2 7
~ ,mska Oil & Gas Cons. Commission
AnchoraFa
~ STATE OF ALASKA /-~";
' ~,SKA OIL AND GAS CONSERVATION COM,. ,=ION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Su.pend
Alter casing Repeir well
Change approved program
2. Name of Operator
BP Exploration (Alaska) Inc.
3, Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1645'SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'$NL, 4081°WEL, Sec. 30, T11N, R14E, UPM
At effective depth
2002' SNL, 4281°WEL, Sec. 30, T11N, R14E, UPM
At total depth
2022'SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11915 feet
BKB 9257 feet
11862 feet
9209 feet
Casing Length
Structural --
Conductor 110
Surface 2689
Intermediate 10926
Production --
Liner 1216
Perforation depth: measured 11644'-11672'
Size
20x30
13 3/8
95/8
7
operation Shutdown .... Re-enter suspended well
Plugging Time extension Stimulate ~
Pull tubing Variance Perforate X Other
5. Type of Well:
Development
Exploralory
Stratigrophio
Service
Plugs (measured)
Junk (measured)
Measured depth
143
2722
10959
Cemented
8 c.y.
3939 c.f.
1697c. f.
360 c.f.
6. Datum elevation (DF or KB)
KBE - 71.71 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
C-26 (12-30-11-14) PBU
9. Permit number
82.160
10. APl number
50- 029.20834
11. Field/Pool
Prudhoe 011Poqt~ ~ ~ r" ~ t ~ ~
i~Et. Ei V E~
FEB 2 ? 1990
&ias_~ DJl & Gas Cons, CO~
"'i~.:, ~chora~ *'
True ve~ical de~h
BKB
2678
8426
10699-11915 8218-9257
Sqzd: 11474;11514', 11570;11598', 11640;11644'
true vertical (subsea)
8944'-8969'
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 11620'
Peckers and SSSV (type and measured depth) 9 5/8" Baker packer at 10653', 7" Baker packer at 116109 4 1/2" $SSV at 1982'
13. Attechments Description summary of proposal ,~ Detailed operations program
BOP sketch
14. Estimated date for commencing operation
February/March 1990
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby ,~rtify that the foregojD, g is true and correct to the best of my knowledge.
SJ~lned ~Y~ ~, /,V/'~~ TitleSupervisorGrav~Draina~e Date ,~/.,~'/~'~
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness I Approval No.
Plug integrity BOP Test Location clearance .,-6 C,o~Y'/I -/ -- /-,=w,~,--
Mechanical Integrity Test Subsequent form required 10- /~Zt-,"'~9~'°~'~Ae~g'~_e~ ,. ~ b
ORIGINAL SIGNED BY '
Approved by order of the Commission LONNIE C. SMri'H ..~,...............,,.... Date (~-J~:;~-
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
1W~.~O.Pr°Pose to Perorate the following additional interval during /~ebruary/~¥/arch
11621'. 11628' MD BKB
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to production immediately following Perforating Operations, then tested.
j/n
2/22/90
BOWEN PACKOFF
FLOW TUBES
& PACKOFF
GREASE SEAL
FLOWTUBE
AND PUMP
FLOWLINE
FLOWLINE ._~~_~ J
VALVE
GREASE LINE
GREASE
t///~ MANIFOLD
GREASE
PUMP
,
RISER
,
~- GREASE
RESERVOIR
BOP
BP EXPLORATION
BP Ex0toration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-511~
To: Distribution
Date: 11/17/89
Transmittal: 80603
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
zC-10 TEMP 11/01/89 %1 11500-11913 Camco
~-C-26 PITS 11/06/89 %1 11550-11841 Camco 5"
~/~F-13 TEMP 11/03/89 %1 8900-9200 Camco
~ S-07 PROD-F 11/03/89 %1 Surf-il400 Camco
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
RESERVOIR
ARCHIVES
BP EXPLORATION
ORIGINA-t
BP Exploration (Alaska) Inc,
900 East Benson Boulevard ~.
RO. Box 196612
Anchorage, Alaska 99519-6612 ~
(907) 561-5111
September 6, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attention' Mr. C. V. Chatterton
Gentlemen'
Well C-26 (12-30-11-14) PBU
Enclosed, in duplicate, is form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of pulling tubing in the well.
Yours very truly,
Workover/Completions Supervisor
RVS/KTH
Enclosures (4)
cc' J. Martin (MB9-4)
North Slope Production Engineers
Mark Grindle (MB 5-3)
Well File
RECEIVED
Alaska Oil & Gas Cons. Cornn~[ssion
Anchorage
/ -" STATE OF ALASKA
^,..-,$KA OIL AND GAS CONSERVATION COMMI,5~,ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate Plugging Perforate
Pull tubing x Alter casing
2. Name of Operator
Standard Alaska Production Company
3. Address ' '
P. O. Box 196612, Anchorage, Alaska 99519-6612
Repair well
5. Type of Well:
Development
Exploratory
Strafigraphic
Service
4. Location of well at surface
1645' SNL, 1032' WEL, SEC. 19, TIlN, R14E, UPM
At top of productive interval
1724'SNL, 4081' WEL, SEC. 30, TIlN, R14E, UPM
At effective depth
2002' SNL, 4281' WEL, SEC. 30, TIIN, R14E, UPM
At total depth
2022' SNL, 4293' WEL, SEC. 30, TIIN, R14E, UPM
i2' Present Well COndition summary
Total depth: measured 11915 feet
true vertical
Plugs (measured)
9257 feet BKB
Other ....
Effective depth: measured
true vertical
6. Datum elevation (DF or KB)
KBE= 71.71 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
C-26(12-30-11-14) PBU
9. Permit number/approval number
82-160/8- 708
10. APl number
5O- O29-2O834
11. Field/Pool
Prudhoe Oil Pool
11862 feet Junk(measured)
9209 feet BKB
Casing
Structural
Conductor
Surface
Intermediate
' Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
-- BKB BKB
110' 20"x30" 8 c.y. 143' 143'
2689' 13-3/8" 3939 c.f. 2722' 2678'
10926' 9-5/8" 1697 cof. 10959' 8426'
1216' 7" 360 c.f. 10699'-11915' 8218'-9257'
measured111474"11514';11570"11644'-11672' (open perforation)1598';11640"11644' (squeezed perforations)R E C E IV E D
true vertical (SUBSEA) 8793'- 8944' (three squeezed intervals)
8944'- 8969' (open interval)
SEP 1 21989
Tubing (size, grade, and measured depth) 4-1/2" L-80 to 11628'. Alaska OiJ & Gas Cons. C0mmissi0
Packers and SSSV (type and measured depth) 9-5/8" Bakerpacker at 10653'; 7" Bakerpacker at 11618';
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Well C-26 is not presently on production. A stimulation for this well is planned in
October, 1989.
15. Attachments Revised 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas Suspended Service
1 ~. '1 hereby certify that the foregoing is true and correct to the best of my'knowledge.
Signed ~~- Title Workover/Comp/etionsSupervisor
Form 10-404 Rev 06J,~5/88
SUBMIT IN DUPLICATE
ATTACHMENT I
C-26 WORKOVER PROCEDURE
Outline ProcedUre:
.
ge
4.
5.
6.
7.
8~
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
MIRU workover rig. Accepted rig at 0001 hrs. on 05-18-89.
Pulled BPV. Circulated diesel from well. Installed two-way check
valve.
ND tree. NU and tested BOP's to 5000 psi.
Cut 5-1/2" tubing. Pulled 5-1/2" tubing.
Changed 9-5/8" packoff.
Washed over 5-1/2" tubing fish. Fished and recovered tubing cutoff.
Milled and recovered 9-5/8" Otis HCL permanent packer and
straddled tubing, blast joints and seal assembly.
Milled and recovered 7" WD packer tailpipe assembly.
RIH with 6" bit and 7" casing scraper to 11,730'.
RIH with 7" RTTS and tested 9-5/8" casing and 7" liner lap to 3000
psi.
Set EZ-Drill at 11,700'. RU for cement squeeze job.
Attempted unsuccessfully to squeeze and hesitate. Circulated to
clear perforations.
RIH 6" bit. Cleaned out cement to 11,668'.
Laid 100 sack balanced plug & squeezed to 2500 psi.
Cleaned out cement to 11668'. Tested perforations to 1000 psi - ok.
RIH w/ RTTS & disc valve for 1500 psi draw down. Sheared disc.
Light blow in bubble bucket. Reverse circulated 2 bbl entry.
RIH 6" bit to 11862'. RIH w/ 9-5/8" and 7" scraper runs. Reverse
circulated.
RIH and set 7" bridge plug @ 11620'. Laid 60 sack balanced plug.
Cleaned out cement to 11620'. Reverse circulated.
RIH w/disk valve and tested squeeze. Test failed. POH. RIH to
cement retainer @ 11620'.
Circulated & cleaned up hole. Ran 7" and 9-5/8" scrapers and 8-1/2"
gauge ring.
RIH w/6" gauge ring/junk basket. Changed rams to 4-1/2".
Ran 4-1/2" completion string & set packers. Spaced out tubing.
ND BOP's & NU tree. Freeze protected well w/diesel.
Released rig @ 1200 hrs on 06-04-89.
BP EXPLOR~N
Daily Drilling Report -- PBU .- Workover
May 18, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 0
Current Operation:
Install 2 way check valve.
MIRU. Accept rig at 0001 hrs. 5-18-89. Pull BPV. Circulate diesel from well. Install 2
way check valve.
RECEIVED
8EP 1 ~ 1989
A/astra Oil & Gas Cons. Commission
Anchorage
Daily Drilling Report -- PBU -- Workover
May 19, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 1
Current Operation: POH 5-1/2" robing.
ND tree. NU and test BOP to 5000 psi. Cut 5-1/2" tubing. Pull 5-1/2" tubing.
BP EXPLORKrK)N
Daily Drilling Report -- PBU -- Workover
May 22, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE# 160476
(Expense)
AFE # 120844
(Capital).
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 4
Current Operation:
with spear.
Pulled 5-1/2" tubing. Changed 9-5/8" packoff. Wash over 5-1/2" robing fish. Fish and
recover robing cutoff. RIH spear and recover SBR.' RIH mill packer. RIH new mill and
milled packer. RIH with spear.
BP EXPLOR.~'ION
Daily Drilling Report-. PBU -- Workover
May 23, 1989 at 0600 hrs
Rig: NABORS 1ES AFE # 160476 AFE Amount:
(Expense)
Well: C-26 (12-30-11-14)
AFE # 120844
(Capital)
AFE Amount-
Current Amount:
0600 Depth: 11862'
Day: 5
Current Operation: POH.
Spear 9-5/8" packer. Hung up in wear ring. Spear parted. Spear packer. POH.
.!
BP EXiR. OR~N
Daily Drilling Report-- PBU -- Workover
May 24, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 ( 12-30-11-14)
AFE# 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 6
Current Operation:
RIH.
POH with 9-5/8" packer and straddle assembly. Spot 40 bbl pill. RIH with 6" packer mill.
BP EXPLOR~N
Daily Drilling Report -- PBU -- Workover
May 25, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476.
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 7
Current Operation:
R[H 6" bit.
Mill packer. RIH with spear. Recover WD packer and tailpipe assembly. RIH 6" bit and
7" casing scraper to clean out.
BP EXPLORN'ION
Daily Drilling Report -- PBU -- Workover
May 26, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE# 160476
(Expense)
AFE# 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 8
Current Operation:
Rig up for cement squeeze job.
RIH to 11730' with 6" bit and 7" scraper. RIH with 7" RTI'S to 10780'. Test 9-5/8" casing
and 7" liner lap to 3000 psi - OK. RIH with 7" EZ Drill and plug catcher. Set E-Z Drill at
11700'. RU for cement squeeze job.
BP EXPLOR.~'~N
Daily Drilling Report -- PBU -- Workover
May 30, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 12
Current Operation:
RU. B.J. Titan.
Pumped 60 bbl. acid followed by 350 bbls sea water. Mix 100 sacks cement. Lay
balanced plug. Attempted unsuccessfully to squeeze and hesitate. Circulate to clear
perforations. RIH 6" bit. Clean out to 11668'. Lay 100 sack balanced plug and squeeze to
2500 psi. - OK. Cleaned out cement to 11668'. Test perforations to 1000 psi. - OK. RIH
with RTrS and Disc valve for 1500 psi draw down. Shear disc after 30 minutes. Light
blow in bubble bucket (5" head). Reverse circulate 2 bbl entry. RIH 6" bit to 11862'.
RIH with 9-5/8" and 7" combination scraper run. Reverse circulate. RIH set 7" bridge
plug at 11620'. Lay 60 sack balanced plug.
RECEIVED
SEP 1 2 t989
J-~taska Oil & Gas Cons. Commission
Anchorage
BP EXPLORN'ION
Daily Drilling Report -- PBU -- Workover
May 31, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 13
Current Operation:
Clean out cement.
Pull 10 stands. Squeeze away 2 bbls @ 2850 psi. Clean out cement to 11620'. Reverse
circulate.
Daily Drilling Report -- PBU -- Workover
June 1, 1989 at 0600 hfs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 14
Current Operation:
Drilling out cement retainer.
RIH with disk valve and tested squeeze. Test failed. POH. Rill to cement retainer at
11620'.
Daily Drilling Report -- PBU -- Workover
June 2, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE # 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 15
Current Operation:
RIH with 6" gauge ting.
Circulated and cleaned up hole. Ran 7" and 9-5/8" scrapers. Ran 8-1/2" gauge ting. RIH
with 6" gauge ting.
BP EXI~I. ORNION
Daily Drilling Report-- PBU -- Workover
June $, 1989 at 0600 hrs
Rig: NABORS 1ES
Well: C-26 (12-30-11-14)
AFE# 160476
(Expense)
AFE # 120844
(Capital)
AFE Amount:
AFE Amount:
Current Amount:
0600 Depth: 11862'
Day: 17
Current Operation:
Moved rig from C-26 to GC-1,
Make 6" gauge rig/junk basket mn. Change rams to 4-1/2". Run 4-1/2" completion string
and set packers. Spaced out robing. ND BOP's amd NU tree. Freeze protect well with
diesel. Release rig 1200 hrs. 6-4-89.
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevara
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO:
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
ARCHIVES
DATE: 09/06/89
Tg: 80333
BP FINAL DATA - PRESSURE SURVEY DATA
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
W-05 Static Gradient 08/16/89 Camco
C-26 BHP Survey 08/22/89 HRS
U-09 BHP Survey 08/21/89 HRS
Y-07 BHP Survey 08/21/89 HRS
Y-08A BHP Survey 08/19/89 HRS
Information Control
Well,Records LR 2-1
J. Dietz/S. McCurry
0ii&Cas C0ns. C0mm ·
Anchorage
BP EXPLORATION
To
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL' '
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: 07-10-89
T%: 80157
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
A-20 COMP 06-30-89 #1
C-26. COMP 06-30-89 #1
E-01 COMP 06-29-89 #1
J-~2/ COMP 07-03-89 #1
R-16 Comp 07-02-89 #1
GC-1E CBT 07-01-89 #1
GC-1E CET 07-01-89 #1
·
12282-12164 Sch
10482-11808 Sch
9336-9700 Sch 5"
8819-9632 Sch 5"
11136-11391 Sch 5"
100-6427 Sch 5"
2582-6448 Sch 5"
Received:
Date:
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL'
PHILLIPS
STATE OF ALASKA
GEOSCIENCE~
RESERVOIR
ARCHIVES
Date: 06/09/89
Tf: 80118
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
A-18 Collar 06/05/89 ~1 9235-10235 Atlas
A-22 Completion 06/02/89 ~1 11300-11783 Sch
A-35 Completion 06/02/89 ~1 9550-9775 Sch
C-26 Completion 06/03/89 %1 11223-11754 Sch
F-07 GR 06/03/89 #1 9157-11590 Sch
J-02 Collar 06/04/89 %1 9100-101184 Atlas
N-11A Gas Lift Temp Sur 05/17/89 %1 2500-10603 Camco
N-19 Gas lift Temp Sur 05/17/89 %1 2500-10010 Camco
S-15 Temp-Spin 05/20/89 %1 2500-11458 Camco
Q-04 Completion 06/04/89 ~1 9365-9600 Sch
J-06 GR 05/16/89 ~1 10000-11452 Camco
W-37, Pits 05/19/89 %1 9650-10214 Camco
GC-lC Collar 06/03/89 %1 5-3585 Sch
GC-iC Straddle Ass Setting Record 06/03/89 %1 3368-3595
5'
5"
5'
5'
5"
1"/5'
1'/5"
1"/5"
5"
5"
5"
5"
Sch 5"
Received:
Date:
co. =o,
'~f 14 ]989 Well Records LR2-1
J. Dietz/S. McCurry
Alaska Oil & Gas Cons. Commissi0l}
Anchorage
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
E~ON
BP Ex0toratton (Alaska) Inc.
900 Ea~ Benson Boulevan:t
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907~ 561-5111
TET~uO Da~'e: 0 4 - 1 8 - 8 9
, ,
TO: MOBIL
PHILLTPS '
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE:: ARCltI'VES '.
·
B~'CASED HO~. ~'m, TAL LOOS
7997 6
The roi lowing materia! Is being submit-fed herewith. Please acknowledge receip"r by
signing a copy of ~'his le~rer and re~rurning It ~ro this office:
E-15 PROD-F 04-12-89 ~/I 10300-10663 SCH
C-26 Puncher &
Plug 04-13-89 ~/1 10480-10750 Sch 5"
Rece i red
// / Alaska 0il & C-~s Con:. Commismo~
~ Anchorage
-- Shirley R. M.CCurry
- INFO~T l 0N CON~
Da~e
We I I Eecords L~-I
.o
INOEXED
HOUSTON
ARCO :STANDARD
CHE~q~ON /\LASKA PP, QDtJC TION
EXXON Date: 10/11/88
TEXACO
TO: r/: 79407
NOBZL
PHILLIPs
ARCHIVES
REFERENCE:
SAPC FINAL 'DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by
slgnlng, a copy of thls letter and returning It to thls offlce:
A-27 Static Gradient 10/08/88 Camco
C-26 Static Gradient 10/05/88 Camco
C- 29 StSc G~.~. dient I 0 / 08 / 88 Camco
G- I 0 StSc Gradient I 0/I I/88 Camco
K-07 Static Gradient 10/04/88 Camco
Q-05 Static Gradient 10/05/88 - Camco
Rece
~ Alask3 0il & Gas Cons. Commmsm
0. t,, 'A~chorage
Irouacled ~a Cle-elom:l. Ohio..n 1870
Jennifer Di~tz
INFORHAT ION CONTROL
Wel I Records LR2-1
Standard Alaska ,,'--'~,
Production Company
900 East Benson Boulevaru
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-511 t
51'ANDARD
ALASKA PRODUCTION
October 12, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of stimulating the well.
Yours very truly,
JAB:JAM
Enclosures (4)
L. Burke (MB12-1)
Well Records (LR2-1) w/10
C-26 Well File
nA. Bragg ' f /
ager Production Engineering
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
~ STATE OF ALASKA
: ~ ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
· Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing []
Alter casing [] Other []
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724' SNI.., 4081' WEL, Sec. 30, T11N, R14E, UPM
At effective depth
2002' SNL, 4281'WEL, Sec. 30, T11N, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
1. Present well condition summary
Total depth: measured
true vertical
11915 feet
BKB 9257 feet
Plugs (measured)
5. Datum elevation (DF or KB)
KBE., 71.71 AMSL feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
0-26 (12.30-11-14) PBU
8. Approval number
8-651
9. APl number
5 0 - 029-20834
0. Pool
Prudhoe Oil Pool
Effective depth:
measured
true vertical
11862 feet
9209 feet
Junk (measured)
Casing Length
Structural --
Conductor 110
S u rface 2689
I nte rmed late 10926
Size Cemented Measured depth True Vertical depth
BKB
20x30 8 c.y. 143 1 43
13 3/8 3939 c.f. 2722 2678
9 5/8 1697 c.f. 10959 8426
Production
Liner
Perforation depth:
._
1216 7 360 c.f. 10699-11915
measured 11464'-11514' (straddle packed)
11570'- 11598', 11640'- 11668 (non-straddle packed)
true vertical (subsea)
8793' - 8965' (three intervals)
Tubing (size, grade and 'measured depth)
5 !/2" L-80 to 10649' with 4 I/2" tailpipa to 11552'
8218-9257
Packers and SSSV (type and measured depth)
2. Stimulation or cement squeeze summary
9 5/8" Otis packer at 10649'; 7" Otis WD packer at 11535',
5 1/2" SSSVat 2156'
,
see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure .~;~ Ll~i.
Representative Daily Average ProduCtion or Iniection Data
Prior to well operation
Subsequent to operation
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
1780 12748 176 0 2006
1650 11507 164 0 2000
4. Attachments
Daily Report of Well Operations [] Copies of Logs and Surveys Run []
that the foregoing is true and correct to the best of my knowledge ~.~-~ ,~.,~
5.
I hereby
certify
Signed ~'~
Title Manager Production Engineering
Date JP'/~' 0~'''
Submit in Duplicate
WELL C-26 (12-30-11-14~ PBU
STIMULATION OPER,ATIONS
A selective mud acid wash preceded by a tubing wash was performed on the following
perforated intervals in Well C-26:
11570'- l1598'MDBKB
11640'- l1668'MDBKB
The 15% HC1 tubing was was performed September 4, 1988.
The mud acid treatment was performed September 14, 1988. The treated intervals
were isolated from the upper straddle-packed interval by pumping ballsealers. The
mud acid treatment was bullheaded as follows:
12 bbls. 15%. HC1 w/mutual solvent
12 bbls. 15% HC1 w/mutual solvent & ballsealers
12 bbls. 15% HC1 w/mutual solvent
25 bbls. 12% HC1 - 3% I-IF
50 bbls. 3% NH4CI
10 bbls. OSR diverter
12 bbls. 15% HC1 w/mutual solvent
25 bbls. 12% HC1 - 3% HF
50 bbls. 3% NH4C1
10 bbls. OSR diverter
12 bbls. 15% HC1 w/mutual solvent
25 bbls. 12% HC1 - 3% HR
80 bbls. 3% NH4CI
250 bbls. dead crude
The well was surged to drop the balls off the perforations. The well was returned to
production immediately following the treatment and tested.
jm
9/28/88
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown r-I Re-enter suspended well r'l Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other []
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1645' SNL, 1032' WEL, SEC. 19, T/IN, R14E, UPM
At top of productive interval
1724' SNL, 4081' WEL, SEC. 30, TIIN, R14E, UPM
At effective depth
2002' SNL, 4281' WEL, SEC. 30, TIIN, R14E, UPM
At total depth
2022' SNL, 4293' WEL, SEC. 30, TIlN, R14E, UPM
5. Datum elevation (DF or KB)
KBE= 71.71AMSL
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
C-26(12-30-11-14) PBU
8. Permit number
82-160
9. APl number
5 0 - 029-2O834
10. Pool
Prudhoe Oil Pool
feet
1. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
true vertical
measured
true vertical
Length
-.
110'
2689'
10926'
1216'
measured
true vertical
11915 feet
9257 feetBKB
11862 feet
9209 feetBKB
Size Cemented
Plugs (measured)
Junk (measured)
20" x 30" 8 c.y.
13-3/8" 3939 c.f.
9-5/8" 1697 c.f.
Measured depth True Vertical depth
BKB BKB
143' 143'
2722' 2678'
10959' 8426'
7" 360 c.f. 10699'-11915' 8218'-9257'
11474'-11514; (straddle packed)
11570'-11598; 11640'-11668' (non-straddle packed)
(SUBSEA) 8793'-8965' (three intervals)
Tubing (size, grade and measured depth) 5-1/2"L-80 to 10649'with 4-1/2"tailpipe to 11552'.
i'~,!~,~ ~: ii~, ~ ~':~.: ,', .......
Packers and SSSV (type and measured depth) 9-5/8" Otis packer at 10649'; 7" Otis WD packer at 11535', 5-1/2" SSSV at
2156".
12. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch []
3. Estimated date for commencing operation
Fourth Quarter 1988
14. If proposal was verbally approved
Name of approver Date approved
15. I here~;;~f .certify .tha~the foreg~ing~s ~rue,,and correct to the best of my knowledge
Signed ~~ ~ ~ ~ Title Workover/Completions Supervisor
Commission Use Only
Date ~-/]
Conditions of approval Notify commission so representative may witness IApproval No.
[] Plug integrity [] BOP Test [] Location clearance
I
Approved Copy
ORIGINAL SIGNED BY Returned
LONNIE C. SMITH ~-/~"~'~ by order of
Approved by Commissioner the commission
Form 10-403 Rev 12-1-85 Submit in triplicate
Attachment I
Well C-26 RIG WORKOVER PROCEDURAL OUTLINE
,
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Pull BV & insert.
Kill well. Set plug in tailpipe.
Freeze protect well.
Set BPV.
MIRU.
Pull BPV. Circulate. Install two-way check.
ND tree. NU BOPE & test to 5000 psi.
Pull 5-1/2" tubing.
Mill & recover straddle-packer assembly.
Cement squeeze perforated interval.
Set 9-5/8" bridge plug.
Remove tubing spool.
Cut and recover 9-5/8" casing @ 2250'. Backoff and recover stub.
Run 9-5/8" NSCC casing and 13-3/8" x 9-5/8" packer.
Displace annulus to dry crude. Set packer.
Install tubing spool.
Clean out bridge plug and cement to 11,862'.
Make scraper runs 9-5/8" & 7".
Perforate well.
Run straddle-packer assembly on 4-1/2" tubing. Log into place and set.
ND BOP. NU & test tree to 5000 psi.
Set packer,~.
Change over annulus to 9.6 ppg brine + 35 bbl diesel and tubing to
diesel.
Set BPV.
Pump down cellar. Release rig.
~W&CD
B.O.P. STACK CONFIGURATION
1:5-5/8 IN. TRIPLE RAM STACK
5000 PSI WP
DRILLING
1
ANNULAR
PREVENTER
2 IN. KILL LINE J
G ATE G ATE J
I I
I I
PIPE RAMS
I I
I 1
I~IP~ RAUS
I I
DRILLING
SPOOL -,
I I
RAMS
!
I
[
I
I 4 IN. CHOKE LINE
HAND HYD. ASST.
Standard Alaska
Production Company -
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
August 22, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to stimulate the well.
Yours very truly,
JAB:JAM
Enclosures (6)
cc: J. L. Haas (MB12-1)
C-26 Well File
ager ~roduction Engineering
RECEIVED
r~u~ 2 L~ ]988
Alaska 0il & Gas Cons. Comr~,ission
Anchorage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforale [] Other []
2. Name of Operator
Standard Alaska Production Company
3. Address
.
P. O. Box 196612, Anchorage, Alaska 99519-6612
Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'SNL, 4081'WEL, Sec. 30, T11N, R14E, UPM
At effective depth
2002' SNL, 4281' WEL, Sec. 30, T11N, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
5. Datum elevation (DF or KB)
KBE = 71.71 AMSL feet
S. Unit or Property name
Prudhoe Bay Unit
7. Well number
0-26 (12-30-11-14) PBU
8. Permit number
82-160
9. APl number
5 0 - 029-20834
10. Pool
Prudhoe Oil Pool
1. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
Casing Length
Structural --
Conductor 110
S u rface 2689
Intermediate 10926
Production --
Liner 1216
Perforation depth: measured
11915 feet
BKB 9257 feet
11862 feet
9209 feet
Size
Plugs (measured)
Junk (measured)
Cemented Measured depth True Vertical depth
BKB
8 c.y. 143 143
3939 c.f. 2722 2678
1697 c.f. 10959 8426
20x30
13 3/8
9 5/8
7 360 c.f. 10699-11915
11464'- 11514' (straddle packed)
11570'- 11598', 11640'- 11668 (non-straddle packed)
true vertical (subsea)
8793'- 8965' (three intervals)
8218-9257
Tubing (size, grade and measured depth)
5 I/2" L-80 to 10649' with 4 I/2" tailpipe to 11552'
^l~s',~a OJJ & 03s Cons. Comm/ssJ0~
Packers and SSSV (type and measured depth) Anchorage
9 5/8" Otis packer at 10649'; 7" Otis WD packer at 11535',
5 1/2" SSSV at 2156'
2. Attachments
Description summary of proposal [] Detailed operations program [] BOP sketch []
13. Estimated date for commencing operation
August/September 1988 ,, · ....... ,~7....~ -,~ .......... ~ ....
4. If proposal was verbally approved
~/__~/'
Name of approver I~o~m ~.~o .... D~.~t~d/O//_..
Date approved
5. I hereby ce~j~y that the .foregoing is true and correct to the best of my knowledge
Si~ned ~,~ ~"/~1,,i,,~ ~.~/~y~-- Title Manager Production Engineerin~l
~ l r T/-- ~ ~,/ Commission Use Only
Condition~"of approval Notify commission so representative may witness IApproval No.
[] Plug integrity [] BOP TeSt~p~ot~t~earance
I
Approved by
SI;lED
,i.~;~.tE C. sum{
Returned
Commissionor
by order of
the commission
Form 10-403 Rev 12-1-85
Date ~'--- ~- ~
Submit in triplicate
WELL C-26 (12-30-11-14) PBU
STIMULATION PROPOSAL
A selective mud acid wash preCeded by a tubing wash is proposed for the following
perforated intervals in Well C-26:
11570' - 11598' MD BKB
11640' . 11668' MD BKB
Thc intervals to be treated will be isolated from the upper straddle-packed interval by
pumping ballscalers. The mud acid treatment will be bullheaded as follows:
12 bbls. 15% HCI w/mutual solvent
12 bbls. 15% HCI w/mutual solvent & ballsealers
12 bbls. 15% HCI w/mutual solvent
25 bbls.-12% HCI - 3% HF
50 bbls. 3% NH4CI
1/20SR diverter volume
· 12 bbls. 15% HCI w/mutual solvent
25 bbls. 12% HCI - 3% I-IF
50 bbls. 3% NI-I4CI
1/20SR diverter volume
12 bbls. 15% HC1 w/mutual solvent
25 bbls. 12% HCI - 3% HR
80 bbls. 3% NH4CI
250 bbls. dead crude
The well will be surged to drop the balls off the perforations. The well will be
returned to production immediately following the treatment and tested.
jm
8/19/88
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE: ARCHIVES
SAPC CASED HOLE FINAL LOGS
I NOEXED
rANDARD
ALASKA PRODUCTION
Date:
TI:
o8/ol/88
79151
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of thls letter and returnlng It to thls offlce:
.,
A-21
C-26
E-05
G-10
U-04
U-05
PITS 07/24/88 ~1 11130-12645 Camco 5"
Prod Prof 07/19/88 ~1 11130-11690 Camco 5"
Leak Detection 07/25/88 ~1 Surf-8700 Camco 5"/2"
Leak Detection 07/22/88 ~1 . 0-8744 Camco 5"/2"
Temperature 07/18/88 ~1 .11150-11373 Camco 5"
Temperature 07/18/88 ~1 9000-9267 Camco 5"
Rece i ved
A un,E o~ ~he o~',g,~oi Slonda
Founded ,n (le,,elond. C~,o~
Anchorage
Jennifer Dietz
NFORMAT ~ ON CONTROL
WeJ I Records LR2-I
INDEXED
DALLAS
ARCO
CHEVRON
E,'CXO N
TE~\CO O~te: 02/08/88
TO: MOBIL TI: 78535
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
ALASKA D -,~. , _
, P,C,,uI..~[ Tid')N
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material ls being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
A-22
A-35
C-26
GC-2C
J-1
N-7
R-23
Static Pressure Survey 01/27/88 ltl
Static Pressure Survey 01/27/88 #1
Completion Record 01/28/88 #2
CBT .. 02/01/88 #1
Completion Record 01/30/88 #1
Production Log (Spinner/Temp) 02/01/88
Completion Record 01/29/88 #2
11349-12120 Sch
9628-9900 Sch
11480-11664 Sch 5"
40-5860 Sch 5"
7996-9078 Sch 5"
#1 10300-10576 Sch
11490-12110 Sch 5"
11
Received
Dete
a ~,.~ ot .he o,.g.not 5'o~do,d 0.1
Foundt'lt .,, (If.Tlc, nd C~.o .,. Ifil0
Victoria Aldridge
I NFOR,~T ION CONTROL
Wel I Records LR2-1
Standard Alaska
Production Company
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
February 10, 1988
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Weli.
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
JTB:JAM
Enclosures (4)
J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
C-26 Well File
J T~. ~rown, Supervisor
Gravity Drainage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
· Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing []
Alter casing [] Other []
2. Name of Operator
Standard Alaska Production Company
Address
P. O. Box 99519-6612
1645' SNL, 1032' WEL, Sec. 19, T11N, R14E, UPM
At top of productive interval
1724'SNL, 4081'WEL, Sec. 30, T11N, R14E, UPM
At effective depth
2002' SNL, 4281' WEL, Sec. 30, T11N, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, T11N, R14E, UPM
5. Datum elevation (DF or KB)
KBE . 71.71 AMSL feet
S. Unit or Property name
Prudhoe Bay Unit
7. Well number
C-26 (12-30-11-14) PBU
8. Approval number
7-989
9. APl number
5 0 - 029-20834
10. Pool
Prudhoe Oil Pool
1. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
11915 feet
true vertical BKB 9257 feet
measured 11862 feet
true vertical 9209 feet
Length Size
..
110 20x30
2689 13 3/8
10926 9 5/8
Plugs (measured)
Junk (measured)
Cemented
Measured depth
143
2722
10959
..
1216
measured
8 c.y.
3939 c.f.
1697 c.f.
7 360 c.f. 10699-11915
11464'- 11514' (straddle packed)
11570'- 11598', 11640'- 11668 (non-straddle packed)
true vertical (subsea)
8793'- 8965' (three intervals)
Tubing (size, grade and measured depth) 5 I/2" L-80 to 10649' with 4 I/2" tailpipe to 11552'
True Vertical depth
BKB
143
2678
8426
8218-9257
Packers and SSSV (type and measured depth) 9 5/8" Otis packer at 10649'; 7" Otis WD packer at 11535', 5 1/2" SSSVat 2156'
2. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1670 11785 126 0
1610 11167 121 0
Tubing Pressure
2048
2089
14. Attachments
Daily Report of Well Operations 131 Copies of Logs and Survey~_~. oC~.,~'
5. I hereby certify that the foregoing is true and correct to the best of my knowledge . /~7,.-/?-
Title Supervisor Gravity Drainage Date Z / ~)/~ ' I
,~gn ( )
Form 10-4~ Rev. 12-1-85
Submit in Duplicate
Well C-26 (12-~0-11-14) PBU
Additional Perforating Opera~ions
The following additional interval was perforated January 28, 1988
using Schlumberger 2 1/8" Hyperdome carrier guns at 4 spf:
11640' - 11558' MD BKB (8940' - 8955' TVDss)
Depths are referenced to BHCS, 11/1/82.
A lubricator was installed and tested to 3500 psi for all well work.
The well was returned to production immediately following perforating
operations.
2/08/88
0800Z
Standard Alaska ~
· ~,
Product,on Compa~ ~
900 East Benson Bou .... ~-
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
December 18, 1987
Alaska 0il & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
Yours very truly,
JTB: JAM'~~
Enclosures (9)
J. L. Haas (MB12-1)
C-26 Well File
J. ~: Brown, Supervisor
Gravity Drainage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
~ STATE OF ALASKA ' "
AL, ,,..~A OIL AND GAS CONSERVATION CC,,,,MISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well i-3 Alter casing ~
Time extension [] Change aPproved program [] Plugging [] Stimulate [] Pull tubing [] Amend order i:J Perforate ~ Other []
2. Name of Operator 5. Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTION COMPANY KBE = 71.71 AMSL feet
3. Address 6. Unit or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4.
Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM
At top of productive interval (top Ivishak/Sadlerochit)
1724' SNL, 4081' WEL, Sec. 30, TllN, R14E, UPM
At effective depth
2002' SNL, 4281' WEL, Sec. 30, TllN, R14E, UPM
At total depth
2022' SNL, 4293' WEL, Sec. 30, TllN, R14E, UPM
7. Well number
C-26 (12-30-11-14) PBU
8. Permit number
82-160
9. APl number
50--029-20834
10. Pool
Prudhoe Oil Pool
11.
Present well condition summary
Total depth: measured
true vertical
11915 feet Plugs (measured)
9257 feet BKB
Effective depth: measured 11862 feet Junk (measured)
true vertical 9209 feet BKB
Casing Length Size Cemented Measured depth True Vertical depth
Structural -- BKB
Conductor 110' 20"x30" 8 c.y. 143' 143'
Surface 2689' 13 3/8" 3939 c.f. 2722" 2678'
Intermediate 10926 ' 9 5/8" 1697 c.f. 10959 ' 8426 '
Production __
Liner 1216' 7" 360 c.f. 10699 '-11915' 8218'-9257'
Perforation depth: measured
11474' - 11514' (straddle-packed)
11570' - 11598'
true vertical (ss) R E ~ E I V'~'-~'
8793' - 8903' (two intervals)
Tubing (size, grade and measured depth) ~)~C 2 2 987
5 1/2" L-80 to 10649' with 4 1/2" tailpipe to 11552'
Packers and SSSV (type and measured depth) ,~.,_~:..~. ~1 &.__~...,,.,,Gas C0r,.~..C0ml[ll£$10[i
9 5/8" Otis pkr. @ 10649', 7" Otis WD pkr. @ 11535', 5 ]../2" SS.~'~C~t¢~S¢,'
12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch ~
13. Estimated date for commencing operation
January 1988
14. If proposal was verbally approved
Name of approver
Date approved
15.,I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~.~,~~ Title Supervisor Gravity Drainage Date
T. Brown Commission Use Only
Conditions of approval Notify commission so representative may witness I Approval :o. ,.~7..
[] [] Tee, []
Approved Copy
Returned
ORIGINAL SIGNED BY
Approved by LONNIE C, SMITH
Form 10-403 Rev 12-1-85
Commissioner
by order of ,/.~ .~__...--, _..,Ic~'~.~. ~.~_J
the commission Date .........
Submit in triplicate
Well C-25 (12-30-11-14) PBU
Additional Perforating Proposal
We propose to perforate the following intervals during January 1987 at
4 spf.
Add'l. 11640' - 11668' MD BKB (8940' - 8965' TVDss)
Depths are referenced to BHCS, 11/1/82.
A lubricator will be installed and tested to 3500 psi for all well
work. The well will be returned to production immediately following
perforating operations.
jam
12/17/87
0800Z
FLOW TUBES
& PACKOFF
BOWEN
PACKOFF
HAND
PUMP
GREASE SEAL
FLOWTUBE
FLOWLINE
FLOWLINE
VALVE
GREASE LINE
RISER
GREASE
' -MANIFOLD
GREASE
PUMP
BOP
· -.~ GREASE
RESERVOIR
Slondoed Aloha
Production Compa~
900 East Benso~
P.O. Box 196612
Anchorage, Alaska 99519-66
(9O7) 564-5 ! I i
DALLAS
ARCO
CHEVRON
· EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 06/05/87
TI: 77952
REFERENCE:
SAPC CASED HOLE FINAL LOGS
,
'The following material is being submiq~ed herewith. Please acknowledge receipt by
signing a copy of thls leJ~er and returning it ~o this offlce:
B-9
B'16
C-26
F-5
F-27
H-3
J-5
J-13
J-13
J-23
J-23
N-3
N-3
N-7
R-6
S-6
Rece I ved
Date -
Injection Profile 05/20/87 #1
Collar Log 05/19/87 #1
DFT 05/11/87 #1
Production Profile 05/17/87 #1
CBT 11/06/86 #1
Cont. Flow Survey 05/11/87 #1
Cont. Flow Survey 05/17/87 #1
Borehole Audio Tracer Survey 05/03/87
DFT 05/03/87 #2
Borehole Audio Tracer Survey 05/05/87
Temp. 05/05/87 #1
DFT 05/12/87 #1
GR 05/12/87 #1
Caliper 05/07/87 #1
Injection Profile 05/14-15/87 #1
9800-10058 Camco 5"
9900-10250 GO 5"
10500-11760 GO 5"
11100-11350 Camco 5"
9200-10620 Sch 5"
9850-10137 GO 5"
9950-10260 GO 5"
2000-11600 GO 2"
Surf-il609.5 GO 2"
1000-9800 GO 5"
39-9800 GO 2"
11100-11700 GO 5"
9100-11700 GO 5"
10100-10571 GO 5"
9900-10350 Camco 5"
Cont. Plow Survey 05/10/87 #1 995~10650 GO 5"
// /m~;~ka Oil & Gas Cons. Commission
~/~ ~)'- Anchorage '~
Victoria Aldridge
I NFORNAT I ON CONTROL
We I I Records LR2- I
A unit of the original Standard Od Company
Founded ,. Cleveland. Ohio. ,n 1870
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 995024)612
July 17, 1985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
ATTN: Mr C,V. Chatterton
Well C-26(12-30-11-14)PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our subsequent
to performing an EDTA/scale inhibitor matrix combination treatment
on this well.
7178~. 0505N
Yours very truly,
Enclosures
cc: T.N. Tyler
Well Records
Well File #17
STATE OF ALASKA
ALASKA O~L AND GAS CONSERVATION CO~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL I~ OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 82-160
8. APl 'Number
i Anchorage AK 99502 50- 029-20834
3. Address PO Box 6612,
4. Location of Well 9. Unit or Lease Name
At Surface. Prudhoe Bay Unit
10. Well Number
1645" SNL~. 1032' WEL, Sec. 19, TllN, R14E~. UPM C-26 (12-30-11-14) PBU
11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 71.71' AMSL ADL 28310
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF.'
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation '3~ Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other r-'J
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval was treated with a combinaton EDTA/scale inhibitor matrix squeeze
on June 22, 1985. 40 bbls. of EDTA followed by 14 bbls. scale inhibitor solution were pum
through coiled tubing as a single stage job. The well was shut-in for 24 hours after the
treatment. The SSS¥ was removed prior to stimulation and reset after the job at 2156'.
11570'-11598' BKB (Ref. BHCS/GR 11/1/82)
JUL 1 91~
Alaska 0i~ fi, G~s Cons. commission
l~ l hereby certify that the f°reg°ing is true and c°rrect t° the best °f my kn°wledge'~ ~~j~~~
~~ Title SAPC Petroleum Engineer .. Date
Con~/q/ns of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission Date __
~ed
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
May 23, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alsaka 99501
Attention: Mr. C. V. Chatterton
Wells C-Ii and C-26 PBU
Gent lemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to
perform EDTA/Scale inhibitor matrix combination treatments on these
wells.
JAB H: e lw
524~5/0305
Yours very truly,
,//DJ~t;;icA; ~e~rg~leum Engineer (Acting,
Enclosures
cc: T. N. Tyler
Well Records
Well File #17
RECEIVED
MAY 0 ]985
Oil & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA OiL AND GAS CONSERVATION CC~VlMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 82-160
3. Address 8. APl Number
P.O. BoX 6612, Anchorage, Alaska 99502 50-029-20834
4. Location of Well
At Surface:
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 71.71' AMSL
6. Lease Designation and Serial No.
ADL 28310
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
C-26 (12-30-11-14) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval will be treated with a combination EDTA/scale inhibitor matrix
squeeze in June 1985. 40 barrels of EDTA followed by 14 barrels scale inhibitor
solution will be pumped through coiled tubing as a single stage job. The
well will be shut-in for 24 hours after the treatment. The SSSV will be removed
prior to stimulation and reset after the job at 2156'.
11570'-11598' BKB (Ref. BHCS/GR 11/1/82)
14.
Condit{~/~is of Approval, if any:
RECEIVED
MAY 0 1985
Alaska 0il & Gas Cons. Commission
Anchorage
hereby certify that the foregoing is true and correct to the best of my knowledge.
Acting District
Tit~e Petroleum Engineer
Approved by.
COMMISSIONER
~provecl Co~3y
. Returned
By Order of
the Commission
Date ~"/~//0°~''5'''
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
3111 °'C" STREET
ANCHORAGE. ALASKA
TELEPHONE {g07l 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO.' SFO/UNIT/STATE: GETTY
(-Marathon) MOBIL
Date:2-24-84
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES (CC#' s-Transmittal Only)
CC#:
75063
REFERENCE:
~I0 CASED HOLE FINAL LOGS
~he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/U~TT/STATE:
A-21 '~
C_14.-~'
C-26 ~
E-18/
F-2 /
N-13~
F-24w~
H_16/~
Spinner 12-5-83 #1 11200-11550 Camco 5"
Spinner 2-09-84 #1 11550-11877 Otis 5"
Spinner 12-9-83 #1 11300-11800 Camco 5"
Spinner 1-12-84 #1 10800-11170 Camco 5"
Spinner 1-19-84 #1 10200-10600 Otis 5"
Continuous Flow Survey 1-23-84 #1 9550-9850 GO 5"
Gyro Cont. Tool 11-16-83 #1 37.7-12325 Sch 1"
EPL 10-128-83 #3 9850-10554 Sch 5"
(4/82)
RECEIVED .........
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON '
GETTY
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
CENTRAL FILES (CCI/'s - Transmittal Only)
TO: SFO/UNIT/STATE:
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE Ig071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
1/9/84
Date:
Trans.#:
CC#: 74956
REFERENCE:
IO FINAL DATA - PRESSURE SURVEY DATA
oilowing material is being submitted herewith. Please acknowledge receipt by signing a
of this letter and returning it to this office:--
A-5" - Static Gradient 11/5/83 Camco
A-21j Pressure Survey & BHPD 12/6/83 Camco
C-2 ''~ Pressure Survey & BHPD 11/10/83 GO
C-26 / Static Gradient 11/7/83 Camco
C-26~' Pressure Survey & BHPD 12/8/83 Camco
D-16 -~ Pressure Survey & BHPD 11/10/83 Otis
D-22~ " " " " 11/13/83 Otis
M-il j~ " " " " 12/19/83 Otis
N-17 ~' " " " " 12/11/83 otis
N-19'f- " " " " 12/7/83 Otis
R- 17'~' " "' " " 12/30/83 Otis
Y-2 '~ " " " " 11/5/83 Camco
M-I0 ~'~ " " " " 12/26/83 Camco
X-14 / Static Gradient 12/30/83 Camco
:4/82)
RECEIVED
Victoria Aldridge TP1-5
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
November 14, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: 'Mr. C. V. Chatterton
Gentlemen:
Well C-26 (12-30-11-14,) PBU
Enclosed, in duplicate, are the following forms for the above-named
well.
2~
3~
GJP: J~H: pj w
Enclosures
Form 10-407, Completion Report;
Form 10-403, Sundry Notice and Reports on Wells;
FOrm 10-404, Monthly Report of Drilling and Workovers.
cc:
J. D. Hartz
Geology
Well File #17
NOV :,t
Alaska OiJ & Gas Cc, ns. Commis.'-;~on
~ STATE OF ALASKA ,-.,~ _ t~.~
ALASK. -~ AND GAS CONSERVATION C ~MISSlON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL ~1~' GAS [] SUSPENDED [] ABANDONED []' SERVICE []
,
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum Company 82-160
3. Address 8. APl Number
pouch 6-612, Anchorage, Alaska 99502 50- 029-20834
4. Location of well at surface 9. Unit or Lease Name
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM Prudhoe Bay Unit
AJ. Top Producing Interval top of Sag. R. Sst ' 10. Well Number
670' SNL, 4036' WEL, Sec. 30, TllN,'lll4E, UPM C-26 (12-30-11-14)PBU
At Total Depth 11: Field and Pool
2022' SNL, 4293' WEL, Sec. 30, TZiN, R14E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe 0il Pool
KBE = 71.71' AMSLI APL 28310
12. Date Spudded10_17_82 13. Date T.D. Reached11_1_82 14' Date C°mp" Susp' °r Aband' J 15' Water Depth' if °ffsh°re 116' N°' °f c°mpleti°ns11-10-82 feet MSL One
1~. Total Depth (MD+TVD) '18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where sSSv set 211 Thickness of Permafrost
l1915'MD9257'TVD 11862'MD 9209'TVD YES;I~ NO[]I 2156 feetMD 2080l
22. TVPe Electric or Other Logs Run
DIL/SP/GR/BHCS/PDC/CNL/CAL, GR/ccL/CBL, Gyroscopic Survey
23. CASING, LINER AND CEMENTING RECORD
I SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE ._ITOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
ZO~ x 30~insulatec.Conducit~.~. Surface 110 36" 8 cU.yds, concrete
13 3/8" 72# L-80 SurfaCe 2722 17 1/2" 3939 cu.ft. Permafr(,s~ II
9 5/8" 47# L-80 Surface 10959 '12 1/4" 1567 cu.ft. Class G;
130 cu.ft. Permafro,.~t C
7" 26# L-80 i0699~ 1~:~.~- 8 1/2" 360 Cu.ft. Class G w/18% salt
24. PerfOrations open to Production (MD+TVD of Tol5 and Bottom and 25, TUBING RECORD
interval, size and number) '~D~ 'l'rv~Dss' SIZE DEPTH SET (MD) PACKER SET (MD)
5 1/2" 10649' I, 10649' (9 5/8"x4 i/
Prudhoe Oil Pool Top: _1~47_4~ 8793" 4 1/2" tail~ipe 11535' 11519' (7" W.D.)
Bottom: 1!5~8~''!:': '. 8902" 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
* 11474'-11514' BK3 (8793"-8828" TVDss) I~'EPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL'USED
** 11570'-.11598' BKB (8877~--8902'~ TVDss)
* Straddle pack interval ope~ to pro~ucti(~n.
10-29-83
..... ** Non-straddle paCk interval open to prod 10-30-83
27. PRODUCTION TEST
Date First Production I Method of Operation (FlOwing, gas li'ft, etc.)
10- 29-83J Flowing
Date of Test Hours Tested pRODUCTION FOR OIL-BBL GAs-MCF WATER-BBL cHoKE SIZE GAS-OIL RATIO
TEST pERIOD ~'
,
Flow Tubing Casing Pressure CALCULATED jj~.! OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CUR E DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
RECEIVE
Alaska Oil & Gas CuiJ5. Commi~',:io~
Anchorag~
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
GEOLOGIC MARKERS
· : ..,
30.
NAME
Sag. Ro S'st,
Shublik
Ivishak
MEAS. DEPTH
llQ18~
.104 5 t'
11145"
TRUE VERT. DEPTH
8402
'8425+
85U9~
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
II.~.IST OF ATTACHMENTS
~ ~)~iatrict Petrolelnn En~s~i~neer
S~g ~ Title
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
IZnrrn I n_,~nv
,---, ·STATE OF ALASKA ---,
ALASKA ~,L AND GAS CONSERVATION CL ,MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
,..
.
2. Name of Operator
Sohio. Alaska P e_tr ol enn~ -Company.
,. .
.,
3. Address
Pouch 6~612~ Anchorage, Alaska ~'95'02
COMPLETED WELL []
4. Location of Well
At Surface:; ,
1645' SNL, -1032~ WEL, Sec,
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 71 ,..71 t AMSL
6. Lease Designation and Serial No.
ADL 28310
OTHER []
8' AP~L~_m~)~5834
50-
9. Un, it or I,,ease Naj~ne
~ruanoe ~ay Unit
10. Well Number
C-26 (12-30-11-14)?BU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
[] Other [] Pulling Tubing []
Pull Tubing
(Note; Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see :20 AAC 25.105-170).
The following straddle pac~"intez~al was-perforate~ Novemb'er 6, 1982, using Schlumberger
2 .1/8" Hyperd°mes ,. ~t was open to pro~nction'0ctoBer 29, 19.83,
11474'~1'1514 '~ iBKB- (.~ef, '~R{CS'/GR, 11/1/82)_
·
The:!~: f ollowi'ng interval was perforatea' Oa to§-~ '30, 19.83, using Schlumberger 2 1 / 8"
Hyperdomes at 4 s,p,f, ~'
11570 "~1159_8+' ~ (Ref, BHCS/GR, 11/1/82)
A lubridator ~as installed ana te~ted to 3500 psi on all well work,
· t
An SSSV was' set.andttested in tSe 5all-valve nipple at 2156'
1~. I h ti lng is true and correct to the best of my knowledge.
Signed I, Distri=t Petroleum Engineer
The sp below f mission use ~
COnditions of Appr'O, MI, if any:
By Order of
Approved by COMMISSIONER the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
STATE OF ALASKA (~_~
' · AI~ASKA~L AND GAS CONSERVATION CC'-'MISSION
. tONTHLY REPORT OF'DRILLING AND WORt OVER OPERATIONS
well [] Workover operation I-'J
Drilling
..
2. Name of operator
Sohio Alaska Petroleum Company
7. Permit No. .
3. Address
:Pouch 6-612, Anchorage, Alaska 99502
4. Location of Well
at surface
1645 ' SNL,
1032' WEL, Sec. 19, TllN, R14E, UPM
82-160
8. APl Number
so- 029-20834
9. Unit or Lease Name
Prudhoe Bay Unit
~ °'~-3~ ~°'( 12-30-11-14) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of,
NOvember
83
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressur9 tests
14. Coring resume and brief description
15. Logs run and depth where run
6. DST data, perforating data, shows of H2S, miscellaneous data
See Attached
(7. I hereby t ng is true and correct to the best of my knowledge.
I' ~,/r~. \ ~ District Petro[eum ~.ngineer
I $1GNEZ~'-/~~~ ~ ~% , , TITLE , OATE
NOT~por~ ~ t~form is require~ for each calendar month, regardless of the status of operations, and must be
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404
Rev. 7-1-80
filed(in duplicate with the Alaska
Submit in duplicate
PERFORATING DATA - Well C-26 (12-30-11-14)PBU
November 6, 1982:
August 10, 1983:
Perforated the following straddle pack interval using
SchlumBerger 2 1/8" Hyperdomes at 4 spf:
11474'-11514' BEdI (Ref. BHCS/GR, 11/1/82)
·
Pressure tested tubing and inner annulus.
October 29, 1983:
Put straddle pack interval on production.
October 30, 1983:
Rigged up Schlumberger and perforated the following
interval using 2 1/8" Hyperdomes at 4 spf:
11570'-11598' BKB (Ref. BHCS/GR, 11/1/82)
October 31, 1983:
Set and tested SSSV in ball valve nipple at 2156'.
November 5, !983:
Shut in well to prepare for static' pressure survey.
November 7, 1983:
Ran static pressure/temperature survey at 8800' TVDss.
Well on produCtion.
SOHIO ALASKA PETROLEUM COMPANY
May 9, 1983
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C, V. Chatterton
Wells B-18 through B-23 and B-25, C-18 through C-28, and
D-16 through D-23 (excluding D-19)
Gentlemen:
,
EnClosed, in trip!icate, is Form 10-403, Sundry NOtices and Reports
on Wells, for the above-named wells. This contains our proposal:to
perforate these wells.
GJP:JLH:pjw
o r ~'9'ery ly,
_Dist-~-~ Petroleum Engineer
Enclosures
CC:
J. D. Hartz
Geology
Well File #17
STATE Of ALASKA -~--,
ALASKA"' c AND GAS CONSERVATION C. /IMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Nam of Qper
~ohzo~aska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of Well
At Surface:
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 71.71' AMSL
12.
I 6. Lease Designation and Serial No.
ADL 28310
7. Permit No.
82-160
8. APl Number
50-- 029-20834
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
C-26 (12-30-11-14) PBU
11. FieldandPool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF'
(Submit in Triplicate)
Perforate [] Alter Casing [] . Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
[] Altering Casing r-!
[] Abandonment []
[] Other r"l
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals will be perforated during June/July, 1983, using
2 1/8" carrier guns at 4 spf.
A lubricator will be installed and tested to 3500 psi for all well work.
11570' - 11598' BKB (Ref. BHCS/GR, 11-1-82)
11598' - 11628' BKB ( " )
An SSSV will be set and tested in the ball valve nipple at 2156'.
,Contingent interval, to be perforated if well will not sustain flow.
Subsequent Work.Reported
14. I h tif oing is true and correct to the best of my knowledge.
Signed ~/~/ x[.C~_~_...~?~-~__ ] [.JC~X'~ Title District Petroleum Engineer
The Sl~ below ,pr~mmission us4
Conditions of Approval, if any:
Approved by
ORIG'!NAL SIGNED
.BY LOtiHIE C. SMITH
COMMISSIONER
ApF roved Copy
Returned
j--,. /
By Order of
the Commission
Form 10-403
Rev. 74 -80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
TO:
SFO
ARCO
CHEVRON
MARATHON
MOBIL
PHILLIPS
S~SKA
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 1907! 265-0000
MAIL: POUCh 6-612
ANCHORAGE, ALASKA 99502
BPAE (Transmittal Only)
CENTRKL FILES (CCt/'s - Transmittal only)
FERENCE: TELECO MAGNETIC DIRECTIONAL SURVEY (S)
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
RECEIVED'
DATE
_. · t'
,"v':/",. '~ [ ' . .];.
Well'~'-ecord s Dept.
,9 Development Geology TP1-5
SOHIO ALASI:;; PF_T;]OLEU;v~ CO;F:PANY
SFO
ARCO
EXXON
PHILLIPS
STATE OF AK
CENTRAL FILES(CC#'s. Transmittal Onl~
--r-. 311 i "C-
f,14C, 14OJ{AG[. ALASKA
1£LEPHON£ (9071 265-0000
MAIL: POUCH 6.612
ANCHORAGE. ALASKA 99502
Dace: 1 .-1 9.-83
--
Trans. t!:_ ,,30!2 ,
CC~: 56012
Ri::F EFIE NC£:
f__~OHIO MACNETIC LIS TAPES &LIS. TINGS~
.~ ,,~e following material is being submitted herewith..Please acknowledge ~'eceipt by signing a
. /,,'/' copy of this letter and returning it to thcs ofhce:-- ...
~ 4 ' 'Tape Pos.
'eplace-* S-14 ~ DIL/BHC/FDC/CNL/GR 10/19/82 #1&2 656 1 02149
ent tape)
*'A-28"'OH DIL/BHC/FDC/CNL 10/20/82 #1
* C~26 ~OH. DIL/BHC/FDC/CNL/GR . 11-1-82 #1
* D-21J OH DIL/BHC/FDC/CNL/GR 11-1-82 #1
* A-4 -- CH CNL 11/22/82
* H-17/'OH DIL/BHC/LDT/CNL/GR 12/18/82 #1
* A-25 OH DIL/BHC/FDC/CNL . 8/18/82 #1
* D-12 CH CNL 11/28/82 #1
* A-29 OH DIL/BHC/FDC/CNL/GR 11/22/82 #1S2
* D-4 CH CNL 11/28/82 #9
* J-7 CH CNL 11/14/82 #1
* A-27 OH. DIL/BHC/FDC/CNL 9-26-8'2 #l&2
* S-7 CH. CNL 11/20/82 #3
* C-8 CH CNL 11/21/82 #4
* S-13 OH DIL/BHC 10/2/82 #2
* B-24 CH CNL 10/9/82 .#1
* R-9 CH TDT 12/6/82 #1
* E-2 CH CNL 11/16/82 #11
* S-6 OH. DIL/BHC/FDN 11/28/82 ~2
* H-11 CH TDT - 11/22/82 #1
* J-11 CH CNL 11/29/82 #1
* B-8 CH CNL 11/23/82 ,#7
66022 02150
66033 02148
66032 02143
66105 02146
66222 02145
65546 02144
66167 02143
66162 02142
66166 02141
66124 02140
65662 02139
66132 02138
66131 02137
65222 02136
65723 02135
66152 01234
66074 02133
66164 02132
66172 02131
66170 02130
66111 02129
DATE
*SFO & EXXON: AnAsterisk~(*) next to a listing above means you should have
received the Tape(s) and 'Listing(s) directly from the respective service company.
Please confirm this. ~ ~. ~.~___~_K~..~:~~K~ren Mestas-_¥eD.n
........
Alaska 0il & Gas Cons. CommissiOn
Anchorage
..
· o ,
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
December 10, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-403,
Wells, for the above-named well.
GJP:JLH:ps
Enclosures
cc: J. D. Hartz
Geology
Well File #17
Sundry Notices and Reports on
~Districq~ Petroleum Engineer
i ECEIYED
DEC l 1982
Alaska Oil & Gas Cons. Commissior~
Anchorage
/'-" STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION CO,v, MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. ~' DRILLING WELL ~)
COMPLETED WELL []
2. Name of Operator
Sohio AlaSka PetroleUm Company
3. Address
Pouch 6-612, Anchorage, AK 99502
4. Location of Well
OTHER []
At Surface:
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM
7. Permit No.
82-160
8. APl Number
50-- 029-20834
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
0-26 (12-30-11-14)
11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 71.71' AMSL ADL 28310
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval~was perforated November 6, 1982, using Schlumberger
2 1/8" Hyperdomes at 8 spf. A lubricator was installed and tested to
3000' psi on all well work.
11474' - 11514' BKB (Ref. BHCS/GR, 11/2/82)
An SSSV was set and tested in the ball valve nipple at 2157'.
RECEIVED
DEC j. J982
ereb~ ~ Anchorage
14. I h ti lng is true and correct to the best of my knowledge.
-~il~:;~bel~'~mission usage ~ Title District Petroleum Engineer Date
Alaska Oil & Gas Cons. CommiSsior~
Conditions of Approval, if any:
By Order of
Approved by. COMMISSIONER the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
-..
"'~' l ,NDE 3;ED
SOHIO ALASKA PETROLEUM COMPAI'~Y
'10:
SFO/UNIT/
STATE:
SFO
·
.
ARCO
CHEVRON
.
EXXON .
GETTY
~M{ATHON
MOBIL
3111 "C" f.,'IRE[T
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 12/7/82
2908
Trans.~:
CC#: 55908
PHILLIPS
* STAT~ :OF ~
BPAE (Transmittal Only)
REFEmEN~:ENTRAL FILES (CCI! ' s-Transmi t tal Only)
/ ~ S__OHIO OPEN HOLE FINAL LOGS '
V ~T,,h~e,~°~l~°wingmaterial is being submitted herewith' Please acknOwledge receipt by signin9 a
copy of this letter and returning it to this office:--
Date to State
Via Drilling: 12/7/82
SFO/UNIT/STATE:
C-26
C-26
C-26
C-26
C-26
DIL/SFL 1171/82 #1- 9372-11891 Sch 5" & 2"
BHCS/GR 11/1/82 #1 10936-11865 Sch 5" & 2"
FDC/CNL/GR 11/1/82 #1 10936-11839 Sch 5" & 2"
FDC/CNL/GR 11/1/82 #1 10936-11839 Sch 5" & 2"
CPL-Cyberlook 11/1/82 #1 10936-11891 Sch 5"
STATE ONLY:
DIRECTIONAL SURVEYS:
Magnetic Single Shot Directional Survey
Gyroscopic Directional Survey
Date:10/16/82
Date:il/14/82
Job(!: A-1082-016
,
Job/): Boss-16129
RECEIVED
DATE
Oil & ~as. Cons.
Victoria Aldridge
Development Geology
Well Records TP1-5
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
December 10, 1982
Alaska Oil & Gas Conservation Ccmm~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
'WELL 'C'26 '(12-30-11-14) 'PBU
Enclosed, in duplicate, is Fo~m 10-407, Well Completion Report,
for the above-named well together with the Well History,
Well Logs and Directional Surveys.
This well has been ccmpleted with a straddle-pack completion
and perforated behind the pipe.
Very truly yours,
R. H. Reiley
District Drilling Engineer
encs
cc: Well File #17
Geology
RECEIVED
DEC ! o ]982
Alaska Oil & Gas Cons. Col~iSsion
Anchorage
" ' STATE OF ALASKA
' ALASKAi * AND GAS CONSERVATION C¢ ¢llSSION
WELL COMPLETION OR-REcOMPLETION REPORT AND LOG
..
1. Status of Well Classification of Service Well
.
OIL E~ GAS [] SUSPENDED [] ABANDONED E~ SERVICE []
.
2. Name of Operator 7. Permit Number ..
SOhio Alaska Petroleum Company 82-160
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20834 _.
4. Location of well at surface 9. Unit or Lease Name
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM Prudhoe Bay Unit
At Top Producing Interval Top of Sag. R. Sst. 10. Well Number
1670' SNL, 4036' WEL, Sec. 30, TllN, R14E, UPM C-26 (12-30-11-14) PBU
At Total Depth 11. Field and Pool
2022' SNL, 4293' WEL, Sec. 30, TllN, R14E, UPM Prudhoe Bay
,
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. P~%~e Oil Pool
KBE = 71.71 ' AMSLI ADL 28310
,12. Date Spudded10_17_82 13. Date T.D. Reached11_1_82 141 Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns11--10--82 feet MS L O~e
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
11915'MD-9257'TVD 11862'MD-9209'TVE YES ~ NO [] 2156 feet MD 2080 l
22. Type Electric or Other Logs Run
DIL/SP/GR/BHCS/FDC/CNL/CAL, GR/CCL/CBL, Gyroscopic survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED
'20 'x 30 Insulate~ CondUCtor Surface 110 36 8 cu. yds. concrete
13 3/8 72# L-80 Surface 2722 17 1/2· 3939 cu. ft. Permafrost II
· 9 .-5/8 - 47# L-80 Surface 10959 12 1/4 1567 cu. ft. Class G;
130 cu. ft. Permafro st C
7 269 L-80 10699 11915 8 1/2 360 cu. ft. Class G ~/18% salt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
-- .
interval; size and number) ' SIZE DEPTH SET (MD) PACKER SET (MD)
~" ' 5 1/2" 10649' 10649' (9 5/8''x 4,
4.1/2." tail!.ipe 11535' 11519' (7" W.D.)
None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
,.
27. ''' ' 'PRODUCTI°N TEe-I:
Date First Production I Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OILRATIO
TEST PERIOD II~
I
Flow Tubing ': C§sing:Pressure CAE~'UFAT~Dk OIL}BBL' 'GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Pre;s, "i: 24-HOUR RATE
· ,
.
28..' : ~ ~ ' CORE DATA
"Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
· .
· .
:,
.
· ,
DEC 1 0 ;i.982
'~ . Alaska Oil & Gas Cons. Commissiorl
~chorago
,
,,)
Form 10-407
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
Submit in duplicate
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
BI~3
Sag. R. Sst. 11018' 8402'
Shublik 11045 ' 8425 '
Ivishak 11145' 8509 '
31. LIST ~O~ATTACHMENTS
Well Hlstoz}z, Nell Z~gs and Directional Surveys .,
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
~ ~_~~~ ~strict Drilling Engineer
/
Signed [ I--'~ ~'~_~ Title Date_
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection,' salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supPlemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
WELL C-'26' '(1'2--30-11'14) PBU
WELL HISTORY
Spudded well at 1530 .hours October 17, 1982. Vertically drilled 17 1/2" hole
to 1400' ~D, kicked off and directionally drilled 17 1/2" hole to 2735'.
Ran 71 jts. 13 3/8" 725 L-80 Buttress caSing to 2722'. Cemented with 3939 cu. ft.
Permafrost II cenrent. Installed and tested BOPE. Cleaned out to 2680', tested
casing to 3000 psi, okay. Drilled out to 2772', ran leak-off test to 0.62 psi/ft.
gradient. Directionally drilled 12 1/4" hole to 10970'. Ran 269 jts. 9 5/8"
47# L-80 Buttress casing to 10959'. Cemented in two stages: First stage with
1567 cu. ft. Class G cement; second stage through D.V. packer at 2646' with
130 cu. ft. Penmafrost C cement preceded by Arctic Pack. Cleaned out D.V.,
tested casing to 3000 psi, okay. Cleaned out float equipment and directionally
drilled 8 1/2" hole to 11915'. Ran open hole logs. Ran 32 jts. 7" 269 L-80
IJ4S liner to 11915'. Cemen~ with 360 cu. ft. Class G cement with 18% salt.
--
Cleaned out to 11862', tested liner to 3000 psi, okay. Changed well over to
NaCl. Ran CBL. Set 7" W.D. packer with wireline at 11519'. Stabbed into
packer at 11519'. Perforated fram 11474' to 11514'. Sting back into packer,
tested to 3000 psi, okay. Ran 244 jts. 5 1/2" 179 L-80 A/B Mod Buttress IPC
tubing to 10649' with 23 jts. 4 1/2" 12.59 L-80 Buttress IPC tailpipe camplete
with 4 1/2" blast joints from 11411' to 11531' (4 1/2" tailpipe stebbed through
W.D. packer at 11519'). Landed tubing with ball valve at 2156' and 4 1/2"
tailpipe to 11535'. Installed and tested tree. Displaced tubing to diesel,
set 9 5/8" packer at 10649'. Tested tubing to 3500 psi, okay. Released rig
at 1700 hours October 10, 1982.
RECEIVED
Ran gyroscopic survey, tested and secured well November 14, 1982.
' DEC 1 0 L982
Alaska Oil & Gas Cons, COmmission
Anchorage
SOHIO ALASKA PETROLEUM CO.
PAD-C (12-30-11-14)
C'26
Controlled
Drilling
Consultants
LES HENDERSON
349-3114
CUSTOMER : SOHIO
LOCATION : PRUDHOE BAY,
WELL PAD : C WELL NO.
DRILLING CO. : NABORS
CUSTOMER JOB NO. :
TELECO JOB NO. : 14~.-AK
DIRECTIONAL
ALASKA
: 26
RIG NO. : 26E
SURVEY REPORT
TELECO OILFIELD SERVICES OF ALASKA, INC.
6116 NIELSON WY., ANCHORAGE, ALASKA, 99502
TEL : (907) 562-2646
DATA REDUCED BY RADIUS OF CURVATURE METHOD
'TYRE OF SURVEY : MAGNETIC
PAGE
MAGNETIC DECLINATION : 51.50 E
START DATE : 08/22/92 FINISH DATE : 08/28/8£
PLANE OF PROPOSED DIRECTION IS : S 15.16 W
REPORT PREPARED BY : GRADY CROW
MEASURED DRIFT TRUE VERTICAL DRIFT
DEPTH ANGLE VERTICAL SECTION DIRECTION
Ding MiN DEPTH DEG ?lin
TOTAL COORDINATES
C L 0 S U R E S
DISTANCE ANGLE
DD MM SS
DOG - LEG
SEVERITY
DEG/100 FT.
·
4782 .G2, 0~ 072,5, 88 523.29 S 2~. 80 W
~35~ ;];~3. :7;~; 48~5.26 416.52 :B 2~. ~ ~J
5ei2 36.48 4914. S7 455.55 S 12. Oe W
5~71 57.48 4961.3~ 488.9'B S 6. ~ W
5521 38.12 5158.90 641.87 S 7.00 W
5605 40.18 5578.85 820.34 S 6.00 W
5795 41.12 5521.25 942.25 S 7.00 W
6074 42.06 5751.22 1127.90 S 7.08 W
6417 42.06 5985.72 1556.55 S 7.00 W
6765
7270
7595
7772
808&
41.06 6244.46 1584.92 S 7.00 W
58.00 6655.59 1904.88 S ~.00 W
57.50 6754.23 1980.65 S 6.00 W
55.18 7057.67 2202.88 S 4.08 W
55.2~ 7295.26 2575.88 S 4.08 W
8555 5A. 50 7505. A7 251A. 27 S 4.00 W
8556 56.48 7685.05 2641.77 S 6.00 W
8776 59.00 7856.65 2776.26 S 9.00 W
9027 58.18 8052.68 2952.99 S 15.00 W
9246 55.2~ 8227.92 5064.85 S 19.08 W
9589 55.18 8545.98 5t&4.06 S 22.00 W
BOTTOM HOLE CLOSURE: 5155.71 FEET AT S 8 40 15
PREPARED BY ABACUS COMPUTER SERVICE 820 W. 719T. AVE,
ENTIRE CONTENTS COPYRIGHT 1985 ABACUS COMPUTER SERVICE
310. 79 S 9~.68 W
:.!,aS. C'7 S iE]h. 17 W
595. G.5 S 12:I.'BG W
434.65 S 152. 14 W
469.96 S 137.74 W
622.88 S 155.16 'W
801.42 S 175.50 W
925.55 S 189.59 W
1108.70 S 212.15 W
1536.94 S 240.18 W
1564.95 S 268.17 W
1886.50 S 299.11W
1962.55 S 305.78 W
2185.40 S 525.28 W
2561.02 S 557.56 W
2500.85 8 547.5& W
2629.17 S 558.57 W
2765.15 S 576.21W
2916. A9 S ~08.80 W
5042.0B S 447.20 W
5117.67 S 475.46 W
ANCHORAGE, ALASKA
q. 17,24 Si~ 59 25 ~4
454. 2:9 S 16 54 3;8 W
489.73 S 16 20 05 W
641.92 S 15 59 15 W
820.~1 S 12 21 07 W
9~2.57 S 11 55 29 W
1128.82 S 10 ~9 57 W
1358.55 S 10 11 03 W
1587.76 S 9 15 25 W
1909.87 S 9 00 57 W
1986.21 S 8 51 21W
2209.~8 S 8 27 57 W
2585.85 S 8 88 11W
2524.86 S ? 54 25 W
2655.51 S ? 45 58 W
2788.65 S 7 45 11W
2945.00 S ? 58 44 W
5074.79 S 8 21 46 W
5155.72 S 8 ~0 15 W
(907) 544-0761
i.754
3.7D7
7.714
6.389
0.294
0.772
0.591
0.520
0.000
0.289
0.718
1.058
0.665
0.689
0.&58
1.167
1.518
1.718
1.886
· i_,CONTRO ED DRILUNG NSULTANTS
::: '?:':/'.i.'i'. :~:: _ 'i':760~Hi8hla'nd° ' 'ri~:e"."
· ? :::::. :-'.. -: 'Anchor:age, AlaSka 99502'
'-' · :'-.-/"'. : ('9'07): 349:3114 "
.
Mr. Brian Rose
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
Dear Mr. Rose:
Magnetic Single Shot Survey
Job No. A-lO82-016
Well C-26
Prudhoe Bay~Field
North Slope, Alaska
Date of.Sur~ey: 10-16-82
Please find enclosed the'"Original" and six (6) copies of our
Magnetic Single Shot Survey on the above well. The method used
in calculating this survey was Radius of Curvature. The depth
of the surve~ was 10,970.
_
Thank you for giving us this opportunitylt° be of service.
-. . Yours very.t~uly, '
Controlled .Drilling Consultants, Inc.
Wayland Yan.cy
Directional Supervisor
COHPLETIO~REPORT ~
HAGNETIC SINGLE SHOT SURVEY
8OHIO ALASKA PETROLEUH
"RAO%US*OF CURYATURE*HETHOD OF'COMPUTAT%OH
COMPUTED FOR CDC BY OCEAHTECH(FM LINDSEY & ASSOC,)
I* NOV 82
K,B, ELEV 71,7t
WELL C-26(12-30-11-t4)
RECORD OF SURVEY
...... TRUE
'~. DRIFT VERTICAL SUB ,DRXFT
DEr'TH ANGLE DEPTH: SEA DIREC
........ D M DEG.
TOTAL COORD[H~TES
0 0 0 , .00 -?'t , 71 $ . O01a
VE.RT IC~L TO
436
529
624
0 0 1400,00 132S,29 S ,OObt
0 15 1436,00 1364,29 $84.00W
0 45 1529.00 1457~29 $ ~,OObi
I t"5 ' 1'62'3,98 ~i9"',
74
5' 0 1970,46 19'90';
2099 ? 15 2097,73 2826.02
!4 11 15 2221,08 2149:37
.00 $ .00 bi
2740 33 30 ~7.43
2834 34 45 2775.24
2928 37 30 2851.16
2625,72
2703.53
2779.45
42 15
3303 45 0
3868 49 15
4370 49 15
3.065,65
3132,96' ~061.25
3517.30 3445:59
3844.99 3773.28
.00
.05
.60
2.23
2'0,21
$ 9,00t~ 33.79
S11,00~ 53,57
8-1,17
I ': '5
$ 8, OObi 240.02
S11 ,OObi 292.02
$1 O,50bJ 346.46
403.e?
462,76
523.64
583; 93
961.98
1302.32
,00 U
,05 Id
,29 W
,07 W
1.45 bi
2,58 W
4,01 W
7,50 td
12., 611 W
18.91 W
24,76 W'
32.10 W
40.80 W
51.14 W
63.87 bi
78,55 W
96.01 Id
117,95 W
286,27 W
CLOSURES
DISTANCE ANGLE
D M
.S
.00 $ 90 0 0 W
DOG LEG
SEVERITY
DEG/1 0 OFT
,000
,00 S 90 0 0 Id
,07 S 41 59 59 W
,81 $ 42 27 21 W
2;25 S; 7 26 52 bi
12.21 $ 6 4?' 48 W
20.39 .~ ? 16 44 bi
34.02 $ 6 45 57 bi
54.09 S ? $7 58 W
8:2.14 S. 8. 49 55.bi
120. 9 2 37 Id
171,'94 = 8 1:6 44 t~
242.16 S 7 37 4 W
294.86 S 7 57 16 W
350,22 $ 8 23 47 bi
408,89 $ 8 59 1'0 W
469,38 S 9 38 1 W
532.3? S 10 23 22 W
5,95.72 S 11 25 10 W
1003.67 S 16 34 19 W
1379,83 $ 19 17 44 W
,000
,694
,538
.526
2,108
,591
2,001
1, ?59
3,201
2,580
4. 961
5. 622
4. 259
I, 69'6
2,932
2,296
3.795
2,419
3. 368
· 908
,000
SECTION
DISTANCE
.00
,00
.79
2.1I
5,26
11,40
19,09
31,77
50.90
77;71
1 13.92
162,11
227.36
277,43
330.42
387,15
446,11
508.11
571. 613
984,62
1364.83
SOHIO WELL' C-26
SINGLE SHOT SUR EY
NO~ 82
RECORD OF SURVEY
TRUE
HERS. DRIFT VERTZCRL
DEPTH ANGLE DEPTH
~07 47 30 4:20!,68
....... 54'41 4? JS 45~3.30
5942 49 30 4996.07
6443 51 15 5215.57
8913 41 15 6880,'08
9449 42 30 7279,18
SUB DRIFT TOTAL COORDINRTES
SE~I DIREC
CLOSURES
DISTANCE ANGLE
D H
DOG LEG
SEVERITY
DEG/1 0 OFT
4129,97 S29,501J
449'i ,* 5*9 ~'30' O0~l
4824,36 S34.50U
5143,96 $33,
6808,37
7207.47
1656,69 S 6-44,38 W
1997,92 S 839,35
2314.44 g 1039.13 td
2634,34 S 1254,90
80 1497, 49 Id
$ 1706,64
,54 1'873.31
~27.~'~ 3933.i6 ~ 2049,57
~27,00~ 4194,40 ~ 2193,12 W
~28,50W 45tt.02 8 2349,70 W
I?'77.59 S 2! IS 13 W
2166.98 S 22 47 20 W
2537.01 S 24 10 43 W
2917.97 S 25 28 16 W
3717.73 $ 27 19 34 W
406!.37 27 28 4 ~
4434.68 ~G 27 30 45 ~
4729.53 $ 27 29 46 ~
5006.29 S 27 30 50 W
,445
,069
.370
· 519
,239
,482
.266
,099
,65?
.36'!
THE FOLL~.JHG Ig EX?~.OI.I~TED TO TD
,434
SECTION
DISTAHCE
1766.17
2158.
2532.
29 t 5.66
3335.23
3717
406t . 32
4434.64
4728.49
5086.25
542:5 '~;09
sg~. 00
6 06:5,44
~OHIO WELL C';25 S]:HGLE ~;HOT GURVEY
NE~$UR£D DEPTH AND'OTHER DATR FOR EVERY EVEH 100 FEET OF SUB $£~ DEPTH.
TRUE
NE~SURED vERTiCPd. ~UB HD'TYD VERTICAL .
DEPTH DEPTH 'gE~ DZFFEREHCE CORRECTIOH TOTAL COORDIH~TE$
0 O. -?2 0
! ?2 ! ?2. ! O0 0
2?2 2,72. 200 0
372 372. 300 0
472 472, 4:0::0 0
S?~: 572, 500 0
672 672. 600 O
?72 772. 700 0
117;2 1172. 1100 0
! 272 1272. 1.200 0
t372 1372. 1300 0
1772'. i700
t 8,?2 t 872, 1800
197'2 197'2. 1900
2379 2372, 23'00
2484 2472. 2400
2594 2572. 2500
0
0
7
12
22
4
3093 2972. 2900
321g 3072. 3000
3359 3172, 31 O0
11i
146
186
379'9
0
0
O~
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1'
3
~0
20
35
40
44
,00 $
,00 ~
· 00 $
,00 S
,00 G
,00 S
.00 S
.00 ~
.oo ~
· O0 $
,00 ~
, 0'0.' 9.
,00 9
,00 ~
· 13 $
8,70 $
13,35 $
20,32 $
30,62
6:29
:o? s
121.73 $
166,51 $
223,57
289.64
3-62', 05
441 , 43 $
528,88 $
620.18 S
~13.94 S
914,99 ~
,00 Y
,00 Y
,00 W
,00 Y
,00 Y
.00 W
.00 W
· 00 Id
, O0 Y
.00 W
.00 W
,00 W
kl
#
,67 W
1,70 W
2.59 U
3
13, i 'W
19.36 g
24.47 Y
73;35 W
97,77 W
132,41 W
17'2,24 W
W
'~OHZO WELL. ¢-26
$,ZNOLE SHOT SURVEY
HEASURED DEPTH AND'OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH.
1 NOV 82
DEPTH
TRUE
YERTZCAL SUB HD-TVD
DEPTH :SEA DX'FFEREHCE
3951
41 05
441 *1
4563
47'i'3
4863
5011
3872, 350.0 379
3672. 36 O0 432
3072, ~00 539
39/72, 3900 5.91
4072, 40*'~G 6'4~'i
4172. 41 O0 690
4272. 4200 730
.4.53 45-7 .45oo
5752 4772. 4700 980
59 05 4872. 48 0.0 1 032
6695 5372, 5300 1323
6859 . 5472. 5400 13'87
7638
?784
8:073.
8215
8.356
8495
8632
5972.
6072.
6,472.
6572.
6672.
58,00 161
5900 1666
60'00 1712
64.00 1884
6500 1923
6600 1960
9035 6972,
VERTXCAL
CORRECT ! ON
53
53
54
53
5;:
50
49
40
4?
49
50
52
56
58
60
6,2
64
06
62
47
46
5'
-44
42
41
39
3?
34
33
TOTAL COORDXNATES
1018,49 $ 314,44
1t22.35 $ 366,23
1226.21 S; 419' 01
1329,98
1431.88
1531,25
1628.14
1723,12
1 ?. &7
469,82 U
522, 06 Y
574,90 ki
628,28 U
682.04 Y
t 911 · 86 $ 788,9:5 td
2005.?0 8 043.91 Y
2099.9:1' 8 '900.05 U
2195.01 8 959,76 [d
2290,95 $ 1023.13 U
230~.07 $ SO Y
2692.85
2797.96
2904.23
301-I. 42
t29'4. O0 Y
1366.16 Id
t441.59 td
3311.: ? ~
3405,09 $ 1764,08 Y
3498.08 $ 1815.64 Y
3590.35 S 1866,1'4 U
3770,67
3850,04
3943,60
4027.15
,4
4187 ,!
4266,25
1963.12 Id
2009,30 U
2054. O0 [d
2097.32 W
2
2220. O0 kt
':SOH ]:0 'WELL C-~26
INTERPOLATED ¥~LUES FOR EVEH 1000 FEET OF HEASURED DEPTH.
TRUE
HERSURED VERT lO,iL SUB
DEPTH DEPTH SEA
TOTRL COORDZHATE$
0 O, -72. ,00 $
! 000 1 000, 928. . O0 S
(' 3000 ;:9oe. ~:e3e. 3ag.os s
3603. 3532. 1 '05 J. 47 ~
6000 4934. 4e6a. 2350. e7 s
7000 5556, 548S.
,00 #
.00
2,75
330.89 td
67'8,18 Id
1064,1.1 g
2994,98 S 1507,92
:U
'0.
1 NOV 82
S~NGLE SHOT SURVEY
HE~SURED DEPTH ~HD'OTHER DATR FOR EVERY EVEN 100 FEET OF SUB SE4 DEPTH,
NOV 82
TRUE
HEASURED VERT Z*C~L' ~UB HiD'TYD VER T ! C~L
DEPTH DEPTH* ~3EA D!FFEREHCE CORRECTZOH TOTRL COORDIHATE$
9169 7072. 7000 2097
9304 7~72. 7100 2J3!
9439 727.2, 7200 216;;'
( 9s74 ?:300 2202
9845 7572, 7500 2272
9979 7672. 7600 2307
10112 77~2, ~700 2340
0502
0630 8172, 81 00
0?'57 8272. 8;200
0882 83?'2. 8300
24,58
2484
251 0
34
3,6
35
35
35
35
33
32
30
26
26
'4345.23 $
4424-. ~2 S
4sos. oD s
4595.37 8
4665.36 S
4744,99 S
4824. t 7 S
4901.52 S
4976,35 $
5'049.73 8
5t 35, O? 9
5243,79 S
5350.74 $
5348.06 $
5367,73 S
2261.17 W
2303,31 Id
2346.44 Id
2390. O? W
2433.50 t~
2476.73 W
2519.74 U
2691 , 94 W
2751,15 W
2809,48 W
2.811,80 W
2:824,3'7 W
HORIZONTAL VIEW
SOHIO ALASKA PETROLEUM
WELL C-26(12-3,0-11-14)
RADIUS OF CURVATURE
MAGNETIC SINGLE- SHOT SURVEY
SCALE; I" = I000'
NOVEMBER 2~ 1982
~0o
TVD = 8442 '
TMD = 10~970' e~r°°
~0o
ALL DEPTHS SHOWN
ARE TVD
November 18,
1982
Mr. Gary Plisga
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Re:
Our Boss Gyroscopic Survey
Job No. Boss-16129
Well: C-26 (SECl9 TllN R14E)
Prudhoe Bay Field
North Slope, Alaska
Survey Date: November 14, 1982
Operator: Sellers
Mr.' Plisga:
Please find enclosed the "Original" and sixteen (16) copies of our
Boss Gyroscopic Multishot Directional Survey on the above well.
Thank you for giving us this opportunity t0beof service.
-
Sincerely,
NL SPERRY-SUN, INC.
Kirk-Afflerbach .- _ .
District Supervisor
_ K /pr
EnClosures
D£O1 0 1982
Alaska Oil & Gas Co~s '
SOHIO ALASKA PETROLEUM COMPANY
PRUDHOE BAY
·
ALASKA
. :. :. :'. ' ': :.ii!:: :!~:.;-. :.....:":: :, .:,::.: ::.:: '-i::::..?~ ':. :'::.::':~?ii!..:':.': i::i!::?::.~i::~::'~.i':i::!:DATE~:!OF: SURVEY' NOVEMBER 14, 19'82
. '.. . · . :. :.: .: .:... ;..., .: .
~OM~ATE. BO ~ R OS'COP-IC-~-OR'I,TE Y
NOVEMBER 17, 19'82 dOB NUMBER BOSS-16129'
KELLY BUSHING ELEV. = 71.71 FT.
· · :. ,:. ~i:i::::::::...:::.:-:::-:.:.i: i:.i:: :...-: . : .... ..: ::::~,::.:i::~ '. OPERATOR';$EKL-E'RS-..?::':::?.,?::.::.~ :.¥ -
:~TRuE ..::.. ': ..::?::::'suB;sEA ' ' C~~C~R~OG~ .=': ': :.:. :::::?'..:::::~":';,:..:', rO~L ::':':::~:,7; :: : ;:::7:::?::::: :C:::::?? ::::: :
.,EASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES
DEPTH DEPTH ~DEPTH DEO MIN DEGREES DEG/IO0 NO~TH/SOUTH EAST/WEST
VERTICAL
SECTION
---200 ......... :200;-00" ': ": "128;-29'' ' ........... ~':';'~ 0'~~N:'29;~"::' ':"':':: ::': 0.:03" ":::~::?::::':'":? ':': 0'. 8ZFN O. 50- W -0'.~
300 299.9'9 228.28 0 20 N 30.39 W O. 05 1· 38 N O. 81 W -0.79'
400 39'9'.99 328.28 0 18 N 42. 0 W 0.08 1.83 N 1.14 W -1.02
.................. 500 ............ 4.9<2.-9.9' ~"" -428;-28
' 800 .........799;-.99 ....': '" 728-..-28" ''~'':::: ::': ": ::: 0~-~:::'':~:::::': :'::::: N-~26---~9-'W .... :':::::::" ":: ::::::::::::::::::::::::::::::::::::::: :::~::. 5I-N 2, 1'<~x-: ....... : ..... :' -!, W~-
900 899'. 99 828.28 0 16 N 19.80 E O. 22 3.96 N 2.22 W -2.32
1000 999.99 <228·28 0 16 N 3·30 W 0·11 4·42 N 2·15 W -2.76
.1"1'00 .....109<2';~98: :' 1'028';'27: '=:::_. ':::: :::::-::' ~:'9 :: :::::.: ~T;-19:::: E:: .:: :::::::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~:~I :.:N ::::::. :. :::.:::: ::::.::::'=:: :2. Ga:=:=: W ================================================ :sZF-
:; k 1300 . 129=9.98::':::::::::
1500 1499.98 1428.27 0 31 $ 8.89 W 0.74 ~.01 N 1.52 W -4.44
1~00 1~.~7 1~28.2~ 1 7 S ~. 0 W 0.~0 4.~7 N 1.~ W -3.11
1-700-----"1699;~2 ...... -:.:-- ::1~2~K:':
2oo ...... ieg :ss "' :::: :::i
2100 20~8.~5 202~.~ 7 13 S 11.10 N 2.02 28.03 S ~.1~ N 27.37
2200 2197. ~5 2125.7~ 10 25
'~ ......... ~300 ..... ~~5; 27"~-:~2~;:5~:
~ ........ ":::' ' ":::;::::: ::::::::::' :. :':. ~ :.:.: · .:: '::.::::::::::7. :::.:: . .'.
24~0 .24~. ~ 2~7. 'I~ ........
· :.:; :::::::::::::::::::::::: . :..:::-............:... . ..::. .. .,::.. :.
2500 ..... ~4'85~8-:'- ~413,-~ ...... 22
.2550 2530. ~0 245~. 1~
2&O0 2575.27 2503.5~ 28 57 S 7.8¢ ~ &.31 lb5.~1 S 3~.00 W 1&1.71
............ ~-'- 2650 '2&18;26 ........... 2546',55 ........ ~--~
. . ·
.... ... -. .............. ::<.::... ::..:.:::::...:...'::. :,,:.: :<..:>:..., ::.;:;: :;::>:. :.:::.::::::::: ::::::.:..::::.... >:::?::~ .:::..: ................ . ........ >::.. :.~. :....., ............ ~.; .......... . ................. . ................. : ...... : ....... ,.:..:;:::>>:~,.:~:.. :::.::.:' :::, :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
SOHIO ALASKA PETROLEUM COMPANY
C-2& (SEC19 ~I-IN-RI4E')
PRUDHOE BAY
ALASKA
COMPUTATION-DATE
NOVEMBER 17, 1982
VERTICAL SECTION CALCULATED ALONG:'CLOSURE~?ii~ii,i:iili,.,.i il."~.~~
...... TRUE .......... SUB-SEA' COURSE''~' ....... COURSE~'~:'''''' DOG=LEO
..EASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY
DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0
SPERRY=SIJN-~EL-L~RVEY~NG--COP~ANY .,
.~.-. ..... .. ANCHORAGE ALASKA
-. . DATE 0F SURVEY NOVEMBER
~O~YROS~~EY
dOB NUMBER BOSS-16129
KELLY BUSHING ELEV. =
*O~A~R-SELLE~ -.
PAGE~2'--
14. 1982
71.71 FT.
TOTAL
RECTANGULAR COORDINATES VERTICAL
NORTH/SOUTH EAST/WEST SECTION
........ -~2900 ......... 2824 z30': '2752 ;-5~ ':":"-: '-:':'--36~52 "--'-:"--': ::'~--1'~-1-~-~ ':?'~::~:~: "::'' 2--5~31'.-~ .5~ ':'?:"~:':'::"~'"'::' "3 ~~--
3000 2~03.23 2831.52 38 54 S 1,4.60 W 3.38 391.20
3100 2978. ~4 , 2~07.23 42 38 S 14.1~ W 3.74 454.45 S 88.34 W 437.82
...... ~ ....... 3200 ........ .3052;'44-'-~2~80~ ;7~ ' · 42'~~-~I~1'0-W ............... - 3~::~:.:.i~:c~::'.:~::~::~.::::.~i~::~:~::~i.5~'~ · ~' ' ::':. i 07:~:.7~::'W .: -50~~
3300 3124.51 ':..':~ :3052.80 :::' ::.::'~:'45: ~:~: ::::::::::::::::::::::::::::: S 23, I~'~W ::~:~:.~?::~"~::~i:~:~:~:.:.3,~62~?~[~7584;-01 ~.:S:~:.:'?'.:.~:~132;~82:::W:~~ :~: :.. 572'28
3400 31~3. 01'~.~':'.~:~':' 3121'. 30 "¥:"::%~:~:"48~' :::::::::::::::::::::::: S:~'26:~730.' W''?~/~:''::~ :~¥:~4:~::1:5 ~ ~ ~6~0~l'2::::~.S':'?:~::?~.~..163:~'~35.~W '?'?~::::~'644.80..
-ss'oo ........ 325e. 3- "SleT.'22 ' -- ' 6;3
3600 3324.4~ 3252.78 4~ 2 S 26.3~ W O. 08 785.20 S 230.1~ W 7~5.21
3700 33~0.24 3318.53 48 44 S 28.50 W 1 . 61 852.05 S 264. ~1 W 870.47
"3800 .... ~'456.
3~00 3521.86 3450.1
( ' 4000 3587.45 3~15' 74 ~ 4~::'?:' 3':::~::.~/.:~?.::~:'S~:: 27;80 ': W':'"" :':'' ?'' .... 0': 17'::~??:'?.?!052'~05 'S' .......... :"~ 370' 2~: W 10~6.37
, 4100
4200 371~.0~ 3647.38 48 50 S 28.50 W 0.26 1184.78 S 441.38 W ~246.86
4300 3784.88 3713.1.7 48 52 S 28.39 W O. 08 1250. ~ S 477.25 W 1322.14
....... 440~~85~'77~-377~'
-- ' --47oo-
4800 411e.92 4047.21 47:24 s 29.89 W 0.14 1575.44 S 659.21 W 1694.10
4900 4186.73 4115.02 47 11 S 30.1~ W 0.30 1639.06 S 696.01 W 1767.60
5000 .... ~:'4254;'~0~--4~83~'1"~~::~:: ?751~:~.?~L:~0.' W
5200 4392.33 4320.. 62 46 ' 36 .~:.~:: S: 2~. 50 W ::?:.~.~:~:::::~::~:~::~?~;~?~?:0,":17:~?.?~?.~.::1828-60::-:S ::':?:~"!~:~'~:~ 804,'64::W :''~? ' 1 ~86.06
................ 5300 ....... 446'1
5400 4529.92 44~8.21 46 48 S 31.30 W 1.04 1~54.04 S 877.65 W 2131.20
' 5500 4598. O0 4526.2~ 47 23 S 34.60 W 2.4~ 2015.48 S ~17.48 W 2204.32
----~- : SP£1~R~ON-W~EL--S-OF{()E¥iNG COMPANY PAGE 3
~i~.~i~i ~i i-~; ~ ~ANCHORAGE ALASKA -.~ ~ ~!~ ~ ~
· soHIo ALASKA PETROLEUM ~ ~! ' ~.~.~ii.~ ~.~ DATE OF sURvEY~ NOVEMBER 14, 1982
'---* ~C-'2&-(SEC-I~-TI-I-N-R14E)- COM~OT~Yi-ON DATE ......
PRUDHOE BAY " NOVEMBER 17, 1982
ALASKA
i .
VERTICAL SECTION CALCULATED ALONG CLOSURE-;i'!'!~i~ii~?'~iii'~!
............... TRUE --SUB-~SEA --
~ASURED VERTICAL VERTICAL
UEPTH DEPTH DEPTH
INCLINATION DIRECTION
DEG MIN DEGREES
B-O'S-S GY-R-O-s'C-~P IC SURVEY
,.JOEl NUMBER BOSS- 16 ! 29
KELLY BUSHING ELEV. =
71.71 FT.
OPERATOR-SELLERS:
DOG-LEG TOTAL
SEVERITY RECTANGULAR COORDINATES VERTICAL
DEG/iO0 NORTH/SOUTH EAST/WEST SECTION
491i?:i!i!:'~'19~.???!?:.?"S~'ii!i34" 8<P>W: ........ 0.' 94?:::::?: '::>21.98.63 '~S .:r.: 1044.55 W '":': ~''' 2426- 46
5700 :4732.57 4660.86
- 5800 4798.75 ' 4727.04
........... 5900"-~----4864"2'1'8 ...... 4792~-47 ' '--4~'.~'4 ...... .............. 8--3~'78~- W 0.22 2260.6,'--S 1087.81 W 2501.
6000 4929.70 4857.99 48 53 S 34.89 W O. 35 2322.61 S 1131.03 W 2577.
6100 4995.27 4923.56. 49 ~ S 35.10 W O. 31 2384.4& S 1174.34 W 2652.
............... 6200 ;~:'50'60:'32~'T'-'T-"4-988~ 61--"~'-~49~4i:~?:::i~ ii~:S~5~O~W.:~-: :':"~' 0-~-~1'~;~ :::~ 2446~ 44 S 1218.239 W : 2727.
&300 : 5124"54' :. :::~.: 5052,83. ....'..::~L... 50 ~2399 ~:?~ ~;36;930 'W: : ~ ~:'09~3 ~ ~ ~25089.g53~ S':': : 1263, 18~W ~:~' :: 2804.
' S40.0 . 951'87'9777~:~::::~?:::: 5116~:~5::~::.~:?~{:.~?~:::~51~?~1~:~?~?~S?:?~36;::30?::W:~:~::~::~?~?~;::~8~:~257~:~97:~ S:~ ' :91309':.04~tW~:~ ~ '2881.
80
06
27
90.
13
13
75
6600 5311.77 5240.06 52, 13
6700 5372.61 5300.89 ' 52 49
6900 '.. 5493"5~:
' 7000 5553, 73917'
.' ......... 71'0'0'--~ 56-1'3';:'~5 5542~-23 --
7200 5674.24 56,02.53 53.
7250 5704.66 5632..95 52 I
S 37.19 W
S 37.10 W
S 37.30 W
S 35.50 W
0.57 2696.31S 1403.42 W 3036.86
0.61 2759.57 S 1451.35 W 3115.60
.69.?"~
.'3353.00
,,.,...,,-,,.:-...~,.,.~,, .~ · .__._.~ ;..:::.,:.:*'.>;.:.:-:,, . _ :,. .,...,,,.., _ ........... ~
0.41 3014.58 S 1642.~8 W 3432.24
0.27 3078.13 S 1691.22 W 3511.39
3.50 3110.06 S 1714.77 W 3550.81
7300 5'736.72 .... . 5665.01 8~.~:::~:~:::::~i:::/':: S:::932. I~--W/.: .::'. :::~ ::..:'.....~'. i~.:. ':':.:. ::93141'..89''J"'~:::.:.':'1736,~i15 W 3589.07
7400 5804.04 :.': :: 5732.32': ::':'i::;~i?:!:.ii::i::?!47ii~i?!:.!i!:~;:'9 i:.;?:!:?:?:~: :S.: 30.6~ W' :~::!:~ii::::i:::~i!i::?:;iii~!:~i::i.;! 1" 53...i:: :::.':,3204~,:c26'":S'::i::~i;~::::'ii:,ii!i 1774.74, W 3662.
7600 ........5940;-75-. .......5869';'04 4~44 ...... S~~O~ 0~4~ ................ 3331 · 15 S 1848.11 W 3808.95 "'
7700 600~. 38 5~37.67 46 35 S 30. 0 W O. 33 33~4.27 S 1884.25 W 3881.6~
7800 6078.30 6006.'59 46 16 S 29.19 W O. 66 3457.26 S 1920.04 W 3954.14
8100 ....... 6287';-41--- .... 6215.-70 4~~S~EIO-I~ 0-:3'3-i ................ 3-6'~-4-;-.41 S 2026.10 W 4169.24
8200 6357.97 6286,26 44 54 S 29' 39 W O. 51 3706.02 S 2061 · 10 W 4240.09
8300 6429.10 6357.39 44' 24 S 29. 0 W O. 57 3767.37 S 2095.39 W 4310.37
8400 ........... 6500';-829:::F~ ....... 6429,"1'19':C:~97'~i43~5~i~ ::::::::::::::::::::: :?::: .~48':~:~.'~:" '38-2~31 i~~W ':'~:.?:: '.'.~,~ 4~8~-~05~:'
': '.:.. '. :: :':, :':., :... :' ~... ~. :~"~ ...... ~:~..:~..~.:.::.::.:-~..r: ::~ ~::~:~::~::t::~;:,~':: ::~::::~t f:~:.j:::;~.:~:~ ~ Y ~: :~::~ ..... ~':' ..': ~ :t~::. ~: ': '~ ' : ,..:~:.:::::~:::: ~.:,:::. ~
SOHIO ALASKA PETROLEUM COMPANY
'---C-26--('SEC19-TIIN-Rl'4E)
PRUDHOE BAY
ALASKA
SPERRY=SUN- WEE~T$ORVEYING--COMP~NY =~,. .... PAGE
COMPUTA'r~ON--DA~rE
NOVEMBER 17, 1982
71.71 FT.
VERTICAL .SECTION CALCULATED ALONG. CLOSURE ~.i~i~i, ii~..
................... , ........ TRUE ........ SUB-SEA COURS~COURS£
'~EASURED VERTICAL VERTICAL INCLINATION DIRECTION
(- ~EPTH DEPTH DEPTH DEG MIN DEGREES
BO~-G-YRO$~OP I C SURVEY
dOB NUMBER BOSS- 16129
KELLY BUSHING ELEV. =
--OPERATOR~EL-LER8
.i .F..~ ,~ .~ --
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
--DOG=LEG
SEVERITY VERTICAL
DEG/IO0 SECTION
8500 6573.13 6501.42 43¥: 26 i~:i:~!:.:.?:i!-'8 2~,; 0 W ...... . .... .:...:0"48':!!i~ii::'~i.!i?::/. :.:3888.73 S 2162.66 :W ' .' 4449.11
8&O0 6646.16 ':.:.' 6574.45 "." 42.'.::iii:~7431::'.:.i:.~:i::?:S..: 29'50 W :.i. - 0..81 i:i?:!"!?:~:~?i::ii:,::::!~':.3~48'~33 S'' :i': .2196.04 W .:.'"~::::':~. 4517.41
.......... 8700 ...... 6719;~0~------6~48;-19-"' ' ":":-:42---I~-2971-0-W ...... 0,:~3 .............. 4'0~. 23 ~ 2~~ W .... 458-~~
8800 6794.04 6722' 33 42 2 S 29. 0 W O. 23 4065. ~0 S '2261.68 W ' 4652.05
8900 6868.71 6797. O0 41 21 S 28.39 W O. 80 4124.24 S 2293.62 W 4718.55
- -~ ~000 ...... 6743. ~ .... ,-~872~18~,~:T ~4 I--' ~F~S'~8;6~W'~ ...... 0';~7~':?.?:, 'L~:;418~I6::-S.;" :::.' ~:,:~.:" 2~2~4~:~ ,'.' ' 478~~
. .
..........,.., .
.91 O0 7018.87 6947.16 41 ';41 :~'~' :~:~ S :, 28, :80 ~. W . "~'. "" 0,: 53:,???:~?~i;~4240 ~.: 17: S .:,~: .';:'~.;.,: 2356. ~6: W':~.:~.:.:~:- :.~i~: 4850.62
9200 7093.32 7021.61 42 '4 S 29.'3~. W ............ ::': 2389' 4~.'~'i:.W ...... :":"::'" 4917.37
~400 _ 7241.47 7 l&~. 7& 42 22 S 2~. &O W 0.28 4415.21 S 245&, O0 W 5051.73
~500 7315.07 7243.3~ 42 50 $ 2~. 8~ W O. 50 4473. ~8 S 248~. 5~ W 511~. 43
96 0 0 ...... 773~; 487~ 7731'6;77-'--~-42 ~'1
9700 "' 7461, 71 :::..:..:.:'~ 7390.00.:~.~:~:~.i.:.?:~ ~':;~:~; ?43
10000 7882.25 7610.54 41 43 S 29.89 W O. 78 4767.51 S 2659.88 W 5458.77
10100 7757.06 7~85.35 41 2& S 30 .' 10. W . O. 31 4824.99 S 2693.07 W 5525.14
.............. 102 3;~2~488 ~1~
'10300 7908.:55'~.?:'.':::.:7836,84"::~.~?.~.':~:'::~?~::.~3~ ~;~?:~:~.~::~.8~:~?~30:..8~:::~??:W::~:.~::~:?~~ :~:~:: ::0.85"~ ~ ~ ~74937,25.:.'S"::?
lO&O0 8140.84 80&~.13 , 3~ 55 S 32.&0 W 1.23 50~8.43 S 285~.~7 W 5845.40
10700 8218. ~0 8 i 47.1~ 37 25 ~ 33.50 W 2.5~ 5150.80 S 28~4.02 W 5~07.78
10900 8377.92::.?.?:.:: 8306'21 ?:~:?:~.?~:~,~?~36:?~ 34:?~.~.~?~.~:~ ?::35,'89~::W:~.~.~?~::~?~1 ~ 50 ~ :::~:5250'.82 ~'.S~:"~ ~ .~ 2962..62.~ W....:~:~~: ' 6028.68
11000 . 8459. ::::::::::::::::: ::::: :: 8387, 62 :::::2/::;:?::::::: :?~:/25:~??:~:: ::S::~:::38.69'~:W ?.?.?::?~7:~?~::~ :.':.~2, 70 :~;~?: :.~:~; .~5297, 02:~.S
.. 1-11 O0 8542;-51s~'!-8470;80 ~:;:::':??'":'~::'3~-0:~":~:~:~::::"::~~~'' ...... '::"":':: i'~5::~-::::~:~-:~:':'::: :'533~-,"8~S
11200 8627.34 8555.&2 30 55 S 38.80 W 2.21 5380.70 S
1 1300 8713.12 8641.41 SO 55 S 38.89 W O. 06 5420.72 S 3098.92 W 6243.
......... . 1-1400 ............ 87~9;"54 .......... 8727;' ~'-~"- ~30~~6;' &O~W~
i
SOHIO ALASKA PETROLEUM COMPANY
~-C-26~($EC19.T11N-R14E) .....
PRUDHOE BAY
ALASKA
:SPERRY-;SUN-WE[iL--SORVEYINO-COMPANY PAOE~F
'~ANCHORAGE ALASKA
' ~ ~ DATE OF SURVEY NOVEMBER 14, 1982
COMPLrTATION-DATE ~OSS-OYROSCOPIC--SORVEY
NOVEMBER 17, 1982 dOB NUMBER BOS$-16129
KELLY BUSHING ELEV. = 71.71 FT.
VERTICAL SECTION CALCULATED'ALONG CLOSURE.-.
--(' ' ..................'TRUE ............ SUB-SEA'- COURSE COURSE--DOG~--IZ. EG FOT-AL
r~EASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
DEPTH DEPTH DEPTH. DEG MIN' DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
i 1600 8975, $8 8~03..67'::'::'::,.'~:~::::~i:' '"27::i:~i!72~ ~i~!i':" S 33.: 1~ W ' :~::: ~.::?iii:ii!:iii~:: i: 1, 61':'i!'!??!i!ii15538.'07:.:~ S '.' ?~: ~:::>.$184,:93!!!! W:i???i!!::!i.ii!i!.!!'::?~388.58
11700 ....... 9064~'~2 ..... e9927~1 ....... ' ...... 27 ........ 0 :':" ..... :~--33;~'SP-W 'Cr;-.~ ..................... ~57~.-~ ~0~. ~7'"~ ................ 6-434~
11800 9153.78 9082.07 26 4 S 32.50 W 0.97 5613.86 S 3234.21W 6478.85
' 11900 9243.59 ' 9171.88 26 4 S 32.50 W 0.03 5650.94 S 3257.83 W 6522.77
........... 1'1915 ...... 9257;07 ..... 9'185-"~6'-
.
HORiZOnTAL
.......................
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
SOHIO ALASKA PETROLEUM COMPANY.
C~26-~¢SECI9--T11N=R1-4E)
PRUDHOE BAY
ALASKA '
INTERPOLATED VALUES' FOR £vEN?'IO00 FEET OF MEASURED:.DEPTH
SPERRY'~SUN-W£~--SOi:~EYINO--~OMP'-ANY .. PAGE-- &
ANCHORAGE ALASKA
' ~ ~%?" .... ".'"'~' ~ '" DATE OF SURVEY NOVEMB~ 14~ 1982
COMP~~~ATE'"'
NOVEMBER 17, 1982 dOB NUMBER BOSS-16129
KELLY BUSHING ELEV. = 71.71 FT.
~-~.~:~'~,~¥'~-~;.::-:~. OPE~~~E~.
' .:.~, ~... i~i.. .
( ' TRUE
MEASURED VERTICAL
.... DEPTH ............ DEPTH
0 O. O0 .
1000-- 999z99 .........
2000 1999.25
3000 2903.23
SUB-SEA TOTAL
VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH .---'~..NORTH;/'$OUTH.~.;-., .... EASTTWES'T'-"iTI'FFERENCE~ CORRECTIONs: .~,~,~
1927 ..54 17.32 S 4.43 W 0.75 0.73
28~31 . 52 391 . 20 S 72.11 W 96.77 96.03
........... 4000 3587-.-45--?--3515;-74 - '
6000 4929.170.' ii" :~' 4857,99
7000~5553'.-73' 5482,-02 2.95077
8000 6217.29 & 145 · 58 3582.50 S 1 ")90.72 W 1782.71 336.44
9000 &943.89 ' 6872.18 4182· 1~ S .2325.14 W 2056.11 273.40
10000 .... 7682;2~5'--"-77& 10 ;'54 ' - .47'67.,51~?:ii..:::i 2659';-88-W :'. :':':':ii:i:: i!i.-L::,.2317.7~'.::'.'?i' i.i i.'::. '..':'":.:"i 26'1-~--64" '"~:. ~'..~i'.~: :. :?: :"..
11000 8459..33 L 8387,62 "': '~''
1191.5 9'257.07 '! 9'185.36 ':':'''~i:~ '5656"50 :,S::~.!ii~:~?i::':"32&l.37:i.W ?' !?:i "i 'ii ~ ' 2657'<~3i??::??~::':'' ' 117.26'~i;::::::?::~:":i?:i'.":~,'":i:;i' '. ?.::':' ;'": .'
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
........ '-'SPERRY;;--cJUN-'WEL/L--..~ORVEYi N~CTOM~'~IqY. . PAGE 7
' , , ~ ' ANCHORAGE~'~ ALAGKA'.?~:~::;' '
·. SOHIO ALASKA PETROLEUM COMPANY' , .: ;:.'. :" :i -:.: ?' -;:::::i: : :::::~ .::':-.?, ': ':::::?i:.::!::ii~,:::i::~:!~?.i.!i!!!?~?::i.:i:'!: DATE:' ' OF suRVEY: ". NoVEMBER 14, 1982
-C';26 ( SEC-19-'TI-l'N-'R 14E-)-- COHPOT~T/-ON-*-D-ATE'
PRUDHOE BAY ' . NOVEMBER, 17, 19G2 ,JOB NUMBER
ALASKA ' ' , KELLY BUSHING ELEV. = 71.71 FT.
............ ' ' -... : ..-...' .... . · ..::.:..::::..: 'OPERA-TOR-;-SE-EL-~R'S~:~.~::i:::~:?..!i ..... :-. ~.:.
' . .: '~"' .:~ ' ': .'~:.~.::'.'?. ::~::~ '.: ::~. :" .:~" -.:i .... '~::' · ':-'~" · ::~ .' :' ::: ':.:'~'~ :':.~:i~:?::':: ?' ?/.-::i:::::-:.:':::~.i'.:~i:~:?.:::.":~;:~:.:~:~i:i:~i:~.:~::' ,::~....:¥!.:,.~?..::~ ~::~i?:!iii:.!iii::iiiiiii!:~i!:i::?!~:.i:ii:?::~i.~:.ii~:i :. :: ::..
~NT_E__RP..J3_ L_A...T_ED '.VALUES FOR.. EVEN I~Oi':FEET: "OF sUB'sEA'?!DEPTH ::;:ii:::::
TRUE
MEASURED VERTICAL
---DEPTH ................... DEPTH
SUB-SEA
VERTICAL
TOTAL
RECTANGULAR COORDINATES
MD-TVD VERTICAL
0 0.00
............ 71 ............7'I~7F .......... 0;-00'
171 171.71 100.00
271 271.71 200.00
371 ........... 371;71 .------300;'00
471 '471.71 400.00
571 571.71 "~ 500.00
671 671'¥'7'~ 600;-00
771 771.71' 700.00
871 871.71 800.00
'0~1'2-N '0:07-~
0.68 N 0.41 W
1.24 N' 0.73 W
:I~-0'4TW
1.37 W
1.63 'W
1'~"84- W
3.39 N 2.13 W
,~.83 N 2.26 W
0-;-00-- 0-;-00
O. O0 O. O0
O. O0 O. O0
0;--0-1:,:, ...:. :..: :!.. 0~-
O. 01:" 0.00
0.00
0:01' 0-,-00
0.01 0.00
0.01 0.00
O. O0
1371 1371.71 1300.00 ' 6.18 N 1.48 W 0.02 0.00
147'1 1471 . 71 1400,. O0 6.26 N 1 . 48 W 0.02 0. O0
.............. ' ..... ~ ...... .' ~ '~ "*~.~1 .... ~ ........ ~ °' ' ":'-'.-:'::: ': '-:::': ':':-~ ........ -" .-
1571 1571,71;,: .:..: 1500.00
SOHIO ALASKA PETROLEUM COMPANY
--C~26--(SEC19-'TI1N-R~4E)
PRUDHOE BAY
·
ALASKA
"$PERRY~'~UN-WEL~-FSU~VE'IFIN(~'C. OMP'~NY
~ ' ~ ~ ~ANOHORAGE ALASKA ~ .r ~.~'~..~:~ ~L.~: ...~
COMPUTATiONiDATE .~. . . ::.~:.DATE OF SURVEY NOVEMBER
14. 1982
NOVEMBER 17, 1,982 dOB NUMBER B055-16129
KELLY BUSHING ELEV. = 71.71
............................................... ' i ¥ ' ' ' .... ~":~":'"i:""":OPERATOR=SEI~~
INTERPOLATED VALUES."!FOR:'EVEN?IO0 FEET. OF.sUB'OEADEPTHi!:r'::
'TRUE SUB-SEA TOTAL
MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
-"DEPTH " DEPTH ..............DEPTH'~'~. ....NORTH/SOUTH--, EAST/WEST-,JD/FFERENCE~CORRECTION
FT.
1872 1'871.71. 18d0.00
............... 1972 ........... 197~71 -'"~-1900:00
2072 2071.71 2000.00
2173 2171.71 2100.00
............ 2275 .... 2271~71-' ........2200;'00
2379 2371.71 2300.00
!..
6.80 S 3.4 0.16 . .
'1-4-.-81 S '4',-1'3-W '0~. 6~ '0.-3~
24.68 S 5.53 W 1.14 0.51
38.61 S 8.45 W 2.16 1.02
57.-84"-$ -- '12;~98'-W :........:~.?:.:.. 4';-1'0' .... I'.-~25 .: .... ...
83..20 :: S 19.20' W :~....:,~:.:.?:~ 7.48 ..:., :: ::' : ':':' .....
· '.'::i: I17,'351!'": S :': :?: 27.35-':::W '-'"":?!i?i~:.i!::':~i:::'i~:? 13; 5 ::::::::::::::::::::::::: ": ::".:~ 6.03 ':.'.:ii!:i!:~?, !i!i:i:f:ii' 'i! :: .-:':i~:":i!:~): ' !:i?:.
':-, , ... ii.,::,-: :i' · ,i, :!:':.¥i'::-" ' .... i,,. , ,.,, , ,
i'6-4:-01- S 35~"72~ 24.-~'4 1-0774
225.62 S 43- 22 W 41.98 17.74
293.10 S 52.33 W 62.97 20. ~
2485 2471.71 2400.00
2595 ..... 257'1~71 '2500';-00
271,3 2671.71 2600.00
2834 2771.71 '2700.00
3519 3271.71 3200.00 730.73
3671 3371.71 3300.00 833.49
............. 3823 .... ~3471~:71--~'--3400;00-~ ....... "----
3975 357.1.71
.,
.... 4128. ': 3671 ' 71.i?':'; .... · 3600..O0'~':i:i~:~i: .............
203.20 W 247.79 51.27
254.84 W 300.20 52.41
' ~OH]:O ALASKA PETROLEUM COMPANY".; ' ':':~::'i:'::~i~:i~i:~i::-.;:.~":~i::~jlj:.DATE"OF:"SURVEY.>.NOVEMBER 14. 1982
--C-26 ( SEC 19-'P11 N- R~/-4E'-)' COMPUTATI ON-"DATE
PRUDHOE BAY . NOVEMBER 17, 1982 dOB NUMBER BOSS-16129
ALASKA KELLY BUSHING ELEV. = 71.71 FT.
............... .-~'~ :: - ~ .~.... :..OPERATOR-=SEL-L-ER~ ....... ~ ....
:: . ' ' ' .~ .-:i :'.:: i ~:'~':~; '.:~ ::::::::::::::::::::::::::::: ;.i:'? ::? ./: .:.'.:".::: :~. ':. ::. :.:'.:. ::: ::?.:':.~. ~..::::.:i?-::~::~'?ii!iiiii~.i!ii::i;?:i::ii?~.::iil.'~? :::. ::::.~:.:.::"'!
TRUE SUB-SEA- TOTAL
MEASURED VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD-TVD VERT I CAL
-~' - DEPTH -DEPTH ......... DEPTH'~'-NORTHYSOUTH~'-EASTTWEST-- DIFFERENCE ..:!!~:.::::: CORRECTION
iJ!:i!~ 427,9
:"'""- .......... 4431~ ...... '3871-'-7i'~$00-;-00 ": '':~'' ":" ' ': :1S38';'12-S?~::::~::::' ":~::'::":'?'~::'~ 524~6-~4::~:~':~::~:':~:~:'~::~'~:'~::'~c56'~I::~::~':~:~:::~'''' :":":: :::' '51.--75 :'~::' ":'"::::::'"~' '"" ':: '" '
14s . v7 s 78.70 .u · o. 1 o
. 1530.85 S 633.57 W 658.47 48.37
1625,'04~687';'8~W========================================================= 8: .::: .: .... 47--7! :':- ....c.::.:.:.:':.:::....::.:.. :.:::..: :-: ..::
':
'!901-;-I2" $ ................................... ~4'6,-~1'~1~ 843'Z'55 45,27' ': ~' :' ..... ':' :~:' ':'" ":' ....... "'"' .... "'"':"'"
1991.
2081.66 S 963.42 W 937.49 48.02
...:i:,..: :../: ~217~.: ~$.::!~::ii:.?i!ii:.!i?~iiii.:!:.!: 1:026,,-75~ W.:2j .~::.:?.:.:::.. :::~,,~ '.987'.-08
4581 3971.71 3900. O0
4730 4071.71 4000. O0
4877 ......... 4171';-'7'1'-~':~4100;-00
5024 4271,71 ':i .4200. O0
5169 4371 -.7I .4300.00
5315 ..... '4471';-71"----'4400;' O0
5461 4571.71 4500. O0
5609 4671.71 4600. O0
5758 ....---'4771-z71"~4700'.'00
5911. 4871.71: ?. :?' 4800. 00
6063 4971 .' 71.:::~. ':': :.~: ?.: 4900, O0
'6217 ..... 507 !-;'7'1~5000';-00--
6374 5171.71 51 O0. O0 2554 .. 89 S 1297.23 W 1202.68 56.78
'6534 5271.71 5200. O0 2655.33 S 1372.31 W 1263.07 60.39
'6698-',~"?'5371',-7'1~75300 ;:'00 -...: :.~-..~;:i:.,?::..~;;.::::.-:'275~'~6~~l-450,T6~~l~26g~Sz.:;.~:~:....~:~:::. ::~:.::. : .63~3 ~ :~.:.:~;¥: ~' :. :...' :...' . .: .'~'
6863 ' 5471.71:-.:.::...::~:.:::~:~5400'O0~/;~??~:~:~?~:~::2863':;&3. S~; ~?~1'~2~.,:;~5~:~ N ~ ?~:~ ~:;:~ 713~.2:'08:~ ~ ~ ~:: ~::~:~:.~:~:::65'27:. ~ ~;~ ::: ~ ~ : ~?~.~: ~ -; .....
702~ ' 5571' 7.1::: ::.'-' :'.:5500' 00":. ~::':':'~::;:':": :':: .~':2~6~.,:'~8:~?~:;~:~ 1 &0~.':36 ::~:.W~:~:~::::~i~::;:':.;~:~ 1458;2&~?::~?~::?:~:?: ::': ::' i::'.:' :'~ ~::~': '&&i: 18: ~:'~: ?:'~?';;:';~?:~;::~:~?:?:~J:?~?::~:'::~:;"":'::':::::/:'::::' ::;'~ :": :'":":
" :: : '. ?: ~- ~-".' ~. .:':.:~' :' ......... :'~: ::.::~:~: ~'::?: ~:~:.::?: ~: ~':::~'?:~i:~i~::~::~ :!::ii~!~:.:::~:~..::~.... :~.::i.~:::.:~i:~.~:~.:.::.:~i::~:~ ~:~:... :~ ~:::~:: :~:~:~::~ ~:i~::~...:.. ?:::..c.. ::::~.::: :~::::.:iL &~:. ::~:: :..:~.~ .::~':~ ~::::~:~. 71. i:.~ ~.:~i~.::..~.:.~ .......... :::. ~ ...... :.. ~ ~:. :.~L ~:.~:.::i.~.. :: :::: :.~i' ~ !~::2 :..::: .>.i~....~. i'i ':~. ~
SOHIO ALASKA PETROLEUM COMPANY
---C_26-.(SEC19-T11N-R14E)-~ ~
' PRUDHOE BAY
ALASKA '
MEASURED
---DEPTH
SPERRY=SUNTWELE-'SORVEYIN~OMPANy ·
ANCHORAGE ALASKA ::i ~!~:.-i:ii?';:i:;~.~: "~i:.~.i:~.; :':.,; ;: ~..i' .
:::~i:~.~.;'~ii?"~:~:i/~,~:~:~;,:,;... DATE OF SURVEY NOVEMBER
COMP~rrATION-DATE
NOVEMBER 17, 1982 JOB NUMBER BOSS-l&129
KELLY BUSHING ELEV. = 71.71 FT.
· ~ · ': ~:: '.~:i~.- .'~-~: :~ .'i~ OPERATO~ELLE~:$
PAGE 10
14, 1982
7352-- 5771';-7:1' ........... 5700';-00 '3174~4--~'75&;'7. 82-W ...........
7499 5871.71 . 5800. O0 32&7.48 S 1811.49 W 1627.48 46.81
7645 5971.71 5900. O0 335~. 74 S 18&4.3& W 1 &73.45 45. ~7
. 7~34. 6171.71 ...;.' 6100.0°. 71.:5" ':.:'.'.:~ 19~7,.68-~W~;;~;~:~?~I762~3~:~:~:~::~:'::'.:"::~;:~:':. 44.18
~077 &271.71.. &~O0. O0~.~
e2~ ~ ..... ~37"z :71-~~300:00' ' ':' 37'z'~s-~';~°~e~u'::''''~''::~:'':?~''ze~o~': ':~" ' 41II. ~a':':": ..... ': .... ,~ · ,: ..... ,; :~ ....
835~ &471.7 ~ &400, O0 3803.78 S 2115.58 N 1887.8& 40.17
8498 6571.71 6500. O0 3887.55 S 21&2.01 W 192&. 33 38.47
8&34 ..... *&&71 ;71 .......,&&O0', O0
87&9 ::: ~771.71 ~:~. ~700';00
8903 . .' 6871.71~ .. 6800. O0 41
~170 707i.71 7000.00 4281.50 S 237~.85 N 20~.17 33.~3
9305 7171.71 7100.00 43&0.11 S 2424.52 N 2133.~ 34.~2
SPERRY---SON-WELL--~ORVEYi'NG-O'OMP~N¥~?~ ~? ,~ ·/~
SOHIO ALASKA PETROLEUM COMPANY
-5-'C'26 (SEC19-Tl'lN-Rl'4E¥ ...........
PRUDHOE BAY
ALASKA
TRUE
MEASURED VERTICAL
...~.~'-DEPTH .............. DEPTH
9850 7571.71 7500.'00
-- ........ 9?85 ....... 7671 .'71' ...... 7600,' O0
.10119 7771.71 7700. O0
, 10251 7871.71 7800. O0
....... 10382 ...... 7971 '~'71-'-----7900'; O0
:.:.: 10310 8071.71 8000. O0
· 10640 8171.71 8i00. O0
-- .... !0766' ---8271-,-7'1~-8200 ,* 00
10892 8371.71 8300. O0
. ' 1 i 015 84.71 . 71 8400. oo
ANCHORAGE., ~ ALASKA ~:. :':'.: :i ~./~.i' ~ '"
COMPOTATION-DATE
NOVEMBER 17, 1982
PAGE 11
DATE OF SURVEY NOVEMBER 14, 1982
dOB NUMBER B055-16129
KELLY BUSHING ELEV. = 71.71 FT.
VALUES FOR EVEN IO0'FEET OF SUB-SEA'DEPTH
INTERPOLATED
SUB-SEA TOTAL
VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
--DEPTH NORTHr/SOI;ITH~EASTIWES~IFFERENC~CORR£CTION .'..~..,..~.i~iiiiii;,., ..... ..... ~..' ....
s !
........ ....... ..........
4836.18 S 2699.55 W 2347.84 33.67
4910'.69 S 2743.82 W 2380.17 32.34
5184'~-'50'~~2~ 1-6-~-48- W ...... 24~4~-84
5247.09 S 2959.91 W 2520.56
5303.'64 S 3003.07 W 2343.30
26'~:~'0
25.72
22.74
11368 · 8771.71 8?00.00
1'1482 887'1'.-7I---8500-~00
1'1595 8971.71 8900.00-
11708 ~071.71 9000.00
11819 ........ ,-"'71'71.7I~ ....~"-~'1'00';00
11915 9237.07 ' 9185.36
3~'92'18'I-$~31- 33'131' ~ 16-i'OT87 1-4¥33 "
5336.47 8 3183.89 W 2624.13 Z3.28
· S~?e. ~e s ssl-~, os ~ ~-~. ~ z~. 4~
-TH~'CALCU~AT'ION-PROCEDURES-USE-A-I~-I'NEAR-~'NTERPO~ATI'ON-BETWEEN
THE. NEAREST 20 FOOT MD (FROM RADIUS OF CURVATURE) POINTS
Sohio Alaska Petroleum Company
Our Boss Gyroscopic Survey
Job No. Boss-16129
Well: C-26 (SECl9 TllN R14E)
Prudhoe Bay Field
North Slope, Alaska
Survey Date: November 14, 1982
Operator: Everett Sellers
Scale: 1" = 1000'
I I I I
-4000.00 -3000.00 -2000.00 -1000.00
TRUE NORTH
Surface Location
(1645SNL 1032WEL)
11915
oO
HOB I Z
- --~30.0 0 00'
· -~o0o. oo
'-5ooo-. o0-
: --6000. O0
'pROJE:CT ION_
, ~,~ '~
Suggested f to be inserted in each "Activ'~"well folder to dIeck
for timely compliance with our regulations.
%
Operator, Well Nama and Numbor
Reports and Materials to be received by:'~10<- IO--F~-
' Date
. Required Date Received Remarks
·
_
Completion Report' .. Yes
·
We11 History Yes /
·
_Samples /~'-'?~/
~ _ ,, ,
·
.....
Core Description ....
Registered Survey Plat 'y e--~
~ ,
Inclination Survey ~/~.~. . -
· ,, , ... ~ '
Directional Survey V~--
Drill Stem Test Reports -,'~/",~'~"'~"'
Prod~cti6n Test Reports~~
., ~ ~,/~4'J-~.
Logs Run. Yes
SOHIO ALASKA PETROLEUM COMPANY
3111 ,,c" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
November 4, 1982
Alaska Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99501
Commiss ion
Attention: Mr. C. V. Chatterton
Well C-26 (12-30-11-14) PBU
Gentlemen:
Enclosed, in ~r:iplicate, is Form 10-403, Sundry Notices and Reports
on Wel~, for the above-named well. This contains our proposal to
perforate the well.
GJP:JLH:ps
Enclosures
cc:
J. D. Hartz
Geology
Well File #17
.._.District Petroleum Engineer
RECEIVED
NOV 1 5 ],982
AJaska Oil & Gas Cor~s. Cornmjs~Jo~
Anchorage
STATE OF ALASKA :?-"'
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL .~.
COMPLETED WELL []
2. Name of Operator
Sohio Alaska Petroleum Company
OTHER []
3. Address
Pouch 6-612 Anchoraqe, Alaska 99502
4. Location of Well
At Surface:
1645' SNL, 1032 WEL, Sec. 19, TllN, R14E, UPM
7. Permit No.
82-160
8. APl Number
50- 029-20834
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
C-26 (12-30-11-14)
11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
KBE = 71.71' AMSL I ADL 28310
12. Check Appropriate Box To Indicate Nature of'Notice, Report, or Other Data
NOTICE OF, INTENTION TO: SUBSEQUENT REPORT OF:
Prudhoe 0il Pool
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval will be perforated during November, 1982, using
Schlumberger 2 1/8" Hyperdomes at 8 spt. A lubricator will be installed
and tested to 3000 psi on all well work.
11474' - 11514' BKB (Ret. BHCS/GR, 11/2/82)
AN SSSV will be set and tested in the ball valve nipple ca. 2000'
*Note: Verbal approval of this job was given by Blair Wondzell on
Wednesday November 3, 1982, to Jim Bragg at Sohio.
Subsec~uent Work Reported
0- Fe~m. No./~Datecl ~J'~ g~"
14. I hereb~~~going is true and correct to the best of my knowledge.
Signed~~J (~~_ Title BJg~_r~k
The s elow f~r ommission use
RECEIVED
Conditions of Approval, if any:
NOV 1 51982
Alaska Oil & Gas Cons. C, on]mis$ior~
Anchorage
Date'
Approved by
'9IIIGINA[' SIGNED
BY [ON~IE C. SMITJJ
Approved Copy
Returned
/ - By Orde~bf
COMMISSIONER the Commission
Date . ~
Submit nt~ons ~nTr~pl~cate
Form 10403
~ _ev. 7-1-80
and "Subsequent Reports" in Duplicate
TO:
L°nnie C. Smith ~~ FILE NO: 108A/J
Commissioner TELEPHONE NO:
FROM:
Harold R. Hawkins
Petrole~ Inspector
SUBJECT:
Witness BOPE Test on
Sohio Well No. C-26
Sec.19,TllN,R14E,UPM
Permit No. 82-160
Tuesday~ OCtober 19, 1982- I'left Anchorage at 3:00 p.m.
By'Alas~a"Airlid~s ~°' !Pr~dhoe Bay arriving at 4:30 p.m. and
at Sohio's DS C-26 at 6:00 p.m.
Tuesday, October 19, 1982- BOPE tests started
Wednesday~ October 20! ~982 - I witnessed the BOPE tests on
~ll'N0' ~i-26 f~r. Soh.zO...~ere were no failures. I filled
out an A.O.G,C.C. report which is attached.
In summary, I witnessed the BOPE test on well No. C-26,
that Nabors performed for Sohio. The BOPE tests were
performed satisfactorily.
'v.10/79) .~
~&G
4/80
STATE OF AI,ASKA
ALASKA OIL & GAS CONSERVATION COMblISSION
B.O.P.E. Inspection Report
Inspector
Operator C~ ~/~/.~
Drilling Contractor
Date
Wel 1
· Location, General
WelI Sign
General Housekeeping
Reserve pit
· Rig
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Results: Failures
Test Pres sure
ACCUMULATOR 'SYSTEM
Full' Charge Pressure ~~ ,~j ,psig
Pressure After Closure _/~,~.,:~> psig.
200 psig Above~ Precharge Attained: ...... min_~i~?_sec
Full Charge Pressure Attained: ,~;'~. min~~sec
Controls: Master ' ~/~
Remote ~B%ind~wi tch
.
Kelly, and Floor Safety Valves
Upper Keliy Test Pressure '~~'~
Lower Kel[ly
Ball Type
Ins ide BOP
Choke Manifold
No. Valves/ ~
..
No. flanges ,~,~ ¢?
j llydrauically operated choke Test Time hrs._
Test Pressure
Test Pressure
Test Pressure
Test Pressure
]tep~ir or Replacement of failed equipment to be made within~ "--:' days and':"
Inspector/Commission. office notified.
·
Distribution
'h orig.' - AO&GCC
~ cc - Operator
\
~. cc - Supervisor
Inspector
September 22, 1982
~ir. R. H. Relley
District Drilling Engineer
~oh!o Alaska Petroleum Company
Pouch $-$12
Anchorage, Alaska 99502
Re~ Prudhoe Bay Unit C-26 (i2-20-11-14) PBU
Sohio Alaska Petroleum Company
Permit 1~o. 82-160
Sur. Loc. 1645' SNL, 1032' WEL, Sec. 19, TllN, R141~,
Btmhole Loc. 255?' SI~L, 591' EWL, Sec. 30, TllI4, R14E, 0P~I
Dear ~r. Reiley:
Enclosed is the approved application for permit to drill the
above referenced well.
I~ell samples and a mud log are not required. A continuous
directional survey is required as per 20 AAC 25.050(b)(5). If
available, a tape containin~ the digitized log information
shall be submitted on all logs for copying except experimental
lo.ga, velocity surveys and dipmeter surveys.
~any rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of anadr-
omous fish. Operations in these areas are subject to AS 16.05.870
and the re~alations promu!~ated thereunder (Title 5, Alaska
Administrative Code). P~ior to commenein~ operations you may
be contacted by the Habitat Coordinator~s Office, Department of
Fish and G~e.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article ? and the ~e~-ulattons promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal ~ater Pollution Control Act, as amended. Prior to
e~encin~.operations you may be contacted by a representative
of the Depart~ent of Environmental Conservation.
To aid us in schedulinc field work, please notify, this office
1~4 hotels pi, Jot to ~ommenetnt; installation of the blowout preven-
tion equil~ent ~o th&t a representative of the C~m~ission may
Mr. R. H. Reiley
Well C-2§ (!2-$0-11-14) PBU
-2-
September 22, 1952
be present to witness testing, of the equipment before the
surface casing shoe is drilled. Where a diverter system is
required, ,please also notify this office 24 hours prior to
e-o~mencin~ equipment installation so that the Commission may
witness testing bSfo~e drilling below the shoe of the conductor
pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
wi tness present.
C, V. Ch.atte~ton
Chat ~,man of
Alaska Oil and Gas ~nse~vation C~ission
sure
Department of Fish & Game,, Habitat Section w/o anti.
Department of l~nvi!,onmental Consex'vatton w/o anti.
CVC/glh
SOHIO ALASKA PETROLEUM COMPANY
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
September 17, 1982
Alaska Oil & Gas Conservation Conm~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
'WET.T. 'C'26' (12'30-11'14) 'PBU
Enclosed are the following d~ts, in triplicate, along with
our check for $I00 to cover the permit filing fee.
1. Application for Permit to Drill;
2. Proposed drilling program outline;
3. Proposed Blo~Dut Prevention Diagram;
4. Surveyor' s plat showing w~ll location;
5. DirectioD~l Map.
If you have any questions, please call R. H. Reiley at 263-5183
or K. W. Kolthoff at 263-5176.
Very truly yours,
encs
cc: Well File #17
R. H. Reiley
District Drilling Engineer
RECEIVED
SEP 2 0
Alaska 0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA C'hAND GAS CONSERVATION CC MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL
REDRILL
DEEPEN
lb. Type of well
2. Name of operator
Sohio Alaska Petroleum ~y
3. Address
Pouch 6-612, Anchorage, Alaska 99502
EXPLORATORY []
DEVELOPMENT OIL [~
DEVELOPMENT GAS []
SERVICE [] STRATIGRAPHIC []
SINGLE ZONE []
MULTIPLE ZONE [~]
4. Location of well at surface
1645' SNL, 1032' WEL, Sec. 19, TllN, R14E, UPM
At tOp of proposed producing interval (~get) ·
2100' SNL, 750' NWL, Sec. 30, TllN, R14E, UPM
At total depth
2387' SNL, 591' NWL, Sec. 30, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF etc.)
Est. KBE = 70' AMSL
6. Lease designation and serial no.
ADL 28310
9. Unit or lease name
Prudhoe Bay Unit
10. Well number
C-26 (12-30-11-14) PBU
11, Field and pool
Prudhoe Oil Pool
12. Bond information (see 20 AAC 25.025)
Type Blanket Surety and/or number Safeco Ins. 2975387 Amount $200,000.00
15, Distance to nearest drilling or completed
NW wen B-3A - 1900
13. DiStance and direction from nearest town 14. Distance to nearest property or lease line
.NW of Deadhorse 10 miles East of ADL 28286 - 750 feet
..
16.'proposed depth (IV{D & TVD) 17. Number of acres in lease
11989'MD -~ 9120' TVD feet 2491
19. If deviated (See 20 AAC 25.050) 45041 ' 120. Anticipated pressures
~ICKoFF POINT '1500 feet. MAXIMUM HOLE ANGLE
20
AAC
25.035
(c)
(2)
~21
~ SIZE
l,.' '-H°le Casing
136 20x30
3/8
12 1/4 9 5/8
8 1/2 7
18. Approximate spud date
November, 1.0. ~ 1982
~ psig@ Surface
._ 4390 psig@ 8800 ft. ~(TVD~
Weight
Insular
729
47#
26#
CASING AND LINER
Grade ~Coupling
~d Cond' ~ctor
L-80 t Butt.
L-80 I Butt.
~-80 IJ4S
22. Describe proposed program:
Proposed Casing, Liner and Cementing Program
SETTING DEPTH QUANTITY OF CEMENT
Length
80
2763
10836
1403
MD TOP TVD
Surface
Surface
Surface
I
I
10586 8210
I
MD BOTTOM TVD
110~ 110
2763I
~ 2700
108361 8384
I
I 9190
11989~
(include stage data)
8 cu. ~ds. concrete
3720 cu. ft. Arcticset
1568 cu. ft. Class G;
130 cu. ft. Arcticset
344 cu. ft. Class G
with 18% salt
See attached proposed drilling and completi°n program. As shown on the attached direction~
plat, 'we are aware of the' potential intersection problems which can result frcm the
drilling of this well. If during actual drilling operations, one of these intersections
is approached within hazardous proximity, the well to be intersected wi[].he_~h.l/t_-_in.
I-[E/VED
SEP 2 0 1982
23; I h~eby certify that the foregoing is true and correct to .the best of my knowledge
. I/ t.. stric
SIGNED t~ ~~~/~~ TITLE '.
The space below for Commission use R. H. ~lley
Alaska 0il & Gas Cons. C0mmlssJ0~
Anchorage
DATE
CONDITIONS OF APPROVAL
Samples required
[~]YES ~NO
"'Permit number
\~APPROVED BY
Mud .log required I
[]YES ~NO
Approval date .
/ '-
Directional Survey required I APl number
~YES (-]NO I 50-
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE ~ ~~. F~
by order of the Commission ,
WELl. C-26 (12-30-11-14) PBU
PROPOSED DRIT.LTNG AND (/~LETION PROGRAM
Dry bucket 36" hole to 80' below ground level and cemant 20" x 30" insulated
oonductor to surface using 8 cu. yds. concrete.
Vertically drill 17 1/2" hole to 1500', kick off and directionally drill to
2700' TVD, and cemmnt 13 3/8" 72# L-80 Buttress casing to surface using
3720 cu. ft. Arcticset II cement.
Blowout prevention equi~ant consists of 5000 psi W.P. pipe rams, blind rams
and annular prevent~_-r from 13 '3/8" casing point to T.D. Maximum possible
bottomhole pressure is 4390 psi at 8800" TVDss based on original reservoir
pressure. Maxinxx~ possible surface pressure is 3330 psi based on a gas
column to surface frc~ 8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12 1/4" hole to 8388' TVD. Run 9 5/8" 47# L-80 Buttress
casing to 8384 ' TVD and cement first stage with 1568 cu. ft. Class G
cemmnt. Cement second stage through D.V. packer collar at 2600' with
130 cu. ft. Arcticset I cement. The 9 5/8" casing will be hung at surface;
thru 9 5/8" x 13 3/8" annulus will be Arctic Packed.
Directionally drill 8 1/2"' hole to T. D. at 9190' TVD. Cement 7" liner to
250' inside 9 5/8" casing shoe with 344 cu. ft. Class G cement with 18% salt.
Run 5 1/2" 17# L-80 A/B Mod Buttress IPC tubing with 13 gas lift mandrels
and a production packer assembly at 8175 ' TVD. A subsurface safety valve
with dual control lines will be placed at 2150 , MD. Displace tubing to diesel.
Install and test Xmas tree.
Suspend ~11 for perforating subsequant to rig release.. Details of proposed
perforations to be sutm~tted on Sundry Notice to follow.
B.O.P. ~TACK CONFIGUEA,~ION
II i i ] i
1:5 5/8" TRIPLE
ii i
RAM STACK
i i i i
5000 PSI WP
DRILLING
ANNULAR
PREVENTER
PIPE RAMS
KILL LINE
BLIND RAMS
DRILLING
SPOOL
CHECK GATE GATE GATE
CHOKE LINE
HYDR. ASST.
GATE
PIPE RAMS
04
Ot
02
04
Q2
05
04
O2
25
~00' (Pt~o~ed) 1800"
/
C-25
/
(Proposed)
WELLS
-; 45'
- "iih .... ' ~ ~- 45'
($4-/$-II. Ii;), 23
JJ~[/.~-/9-//-/;)j, 24
~Hr/.-~o-//-/~)t 25
.... ?~,__o.o.~ L:0
CERTIFICATE OF SURVEYOR
X..PORTION OF T II N
SCALE
PAD DETAIL
SCALE I"= 400'
,R 13 &14 E,U.M.
I": I/2 MILE
J hereby certify that J am properly registered to
practice land surveying in the State of Alaska and that this plat
represents a location survey of the welipad shown and the wells ~...
49TH
thereon.
Th~s
survey was made by me or under my supervision
and ~ltdimen~ion~ ~nd other detail5 ~re correct Bottom hole
Ioco~lofls Qre furnmhed by other~ ~... ~ ~ ~TY_ L:~.Nell ~ ,
!
t ~ ~ ~
Do .e S~VEYOR ~
~/) ~ · ' I I I.I I Ill I
~.PAD C EXTENSION
. ' J ~. Located In
i NE I/4 PR~A~ED SE~. !9,T,H N,,R.14E.,UM!AT MERID~,AK~
ADD PROPOSED C- 25 8~ 2'6 BHL
J Surveyed for
SOHIO ALASKA PETROLEUM CO.
I II I I ! II I
J Surveyed by
J F M. LINDSEY I~ ASSOC.
·
i LAND & HYDROGRAPHIC SURVEYORS
1~)502West Northern Lights Boulevord Box 4-081
IAnchoroge, Alosko A- 1146;5
ADD PROPOSED C-24 8HL
ADD PROPOSED C-25 BHL
.ADD PROPOSED C- 20, 21,& 22 8HL
~DD PROPOSED C o 19 8HL
8/26/82
6/28/82
4/26782
4 / 6/82
A
C~I~ 1~0.0 0,0 1403.6
C-~2 1407.¢ ~.0 1300,0
............................................................................. ~46Tee ......... ~ .........................
~E~L I~ENT
TUD DEPRRT
C-t tsee.e e.e 1485.9 3.3 t96.9
Rl~4~
¢-3 l~eO,~ e~e 148~,4 ?.O 360,3
*l~ee
C~ ~4~7.4 Beg. ~ a4~ · 7 6,3 ~g4 · ~
c-s ~a59, t ~ag.g ~4S,g 1~,4
C-T 24.4 0.0 0.0 e.a 2gG.~
~3oe~
B-3R g~7.4 68a~,8 gaae.3 3~9.5
~-3~ 71~,e 4748,4 71~,~ g6,4 gg3,9
R-~ ~4~.e 6141.g ~,3 ;51g,~ 343t,7
TVD DEPART DISTAHCE
3898,6 1468,~ 4784,6 1896,e g~,7
~306.7 147.1 3700.1
sl?g,a i688,e
4,6 88g,B
G.8 998.6
g.O 110~,3
15.4 1311.8
~8 5984.4 36~5.3 9174,3 6~5,3 713~.3
-C-19 l~.e e.e l~.e ~e.S t~4.2
~743~
R-R4 91~7.4 E~5.8 9~. 6 595e. 4 37~. 9
THE WELL ~HICH CORES CLOSEST TO ~ PROPOSED UELL I5
~ PRIHTE~
GL~ST ~P~H F~ ? ~GREE ~D
E~R R R~T TZTLE
Oil & ~s.s Co~s. Cor~.~iSsicm
C-26 '~~~°~!
CHECK LIST FOR NEW WELL PERMITS
Company .:4 ~'~
Lease & Well No.
ITEM APPROVE DATE
(1) Fee
(2) Loc
(/2 thru ~-)'
(3) Admin
1. Is the permit fee attached ........................................
2. Is well to be located in a defined pool ...........................
3. Is well located proper distance from property line ................
4. Is well located proper distance from other wells ...
5. Is sufficient undedicated acreage available in this
6. Is well to be deviated and is well bore plat included.. ............
7. Is operator the only affected party ...............................
8. Can Permit be approved before ten-day wait ........................
,
thru 11) 10.
11.
(4) Casg ~?~ ~,-~P-~-
(12 thru 20)
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
(21 thru 24)
(6) Add__.! //~T/i/ ~-;g-J~jl
YES NO
·
7
/
Does ~operat°r have a bond in force .................................. ~
Is a conservation order needed ...................................... ~- ~
Is administrative approval needed ...................................
Is conductor string provided
Is enough cement used to circulate on conductor and surface ;% .....
Will cement tie in surface and intermediate or production s~ings .
Will cement cover all known productive horizons ..... .~...~x~.'% .......
Will surface casing protect fresh water zones ...' ..................
Will all casing give adequate safety in collapse, tension and burst
Is this well to be kicked off from an existing wellbore ...........
Is old wellbore abandonment procedure included on 10-403 ..........
Is adequate well bore separation proposed .........................
Is a diverter system required ....................................... /~
Are necessary diagrams of diverter and BOP equipment attached .......
Does BOPE have sufficient pressure rating - Test to ~b'~'Z~ pSig '.
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
Additional requirements
REMARKS
{ 4/v£n
Additional Remarks:
o
Geolog7: Engi~ring:
LCd'
WVA~_ JKT ~-~- RAD
rev: 08/19/82
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file,
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIXi
..
No 'special 'effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER
.
. ............................
* ....... SCHLUMBERGER .......
. ............................
COMPANY NAME : BP EXPLORATION
WELL NAME : C-26
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292083400
REFERENCE NO : 98246
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/06/12
ORIGIN : FLIC
REEL NAME : 98246
CONTINUATION # :
PREVIOUS REEL :
COf4~ENT : BP EXPLORATION, C-26, PRUDHOE BAY, API# 50-029-20834-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/06/12
ORIGIN : FLIC
TAPE NAME : 98246
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, C-26, PRUDHOE BAY, API# 50-029-20834-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: C-26
API ~ER: 500292083400
OPERATOR: BP EXPLORATION
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 12-JUN-98
JOB NUMBER: 98246
LOGGING ENGINEER: DECKERT
OPERATOR WITNESS: PHONG
SURFACE LOCATION
SECTION: 19
TOWNSHIP: 1 iN
RANGE: 14E
FNL : 1649
FSL:
FEL: 1032
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 71.70
DERRICK FLOOR: 70.70
GROUND LEVEL: 38.80
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 8. 500 7. 000 11915.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: DIL
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUFIBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
88888.0
11764.0
11763.0
11760.5
11759.5
11754.0
i1753.5
11743.0
11742.0
11722.0
11721.5
11697.5
11695.5
11695.0
11689.5
11682.5
11676.0
11674.0
11648.0
11646.5
11640.5
11636.5
11636.0
11631.5
11563.0
11562.0
11559.5
11558.5
11551.5
11550.0
11540.0
11525.0
11522.5
11520.5
11519.0
11513.0
11483.5
11482.5
11406.0
11404.0
11373.5
11365.0
11364.0
11360.5
11356.5
15-JUN-1998 15:06
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH RST
..............
88888.5 88889.5
11764.5
11764.5
11761.5
11761.5
11755.0
11755.0
11744.0
11744.0
11723.0
11723.0
11698.0 11698.0
11696.0
11696.0
11689.5 11689.5
11682.5 11682.5
11675.5
11675.5
11649.0
11649.0
11641.0 11641 . 0
11637.5
11637.5
11632.0 11632.0
11564.0
11564.0
11560.0
11560.0
11552.0
11552.0
11539.5 11539.5
11525.0 11525.0
11522.0 11522.0
11519.5
11519.5
11513.0 11513.0
11485.0
11485.0
11408.0
11408.0
11376.5 11376.5
11367.0
11367.0
11363.0 11363.0
11358.5
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
11355.5 11358.5
11340.5 11342.0
11339.5 11342.0
11317.5 11321.5
11298.0 11300.5
11297.0 11300.5
11281.5 11284.5
11280.5 11284.5
11273.0 11276.0
11272.0 11276.0
11253.0 11256.0
11252.5 11256.0
11224.5 11227.5 11229.0
11223.5 11227.5
11218.5 11225.0
11203.0 11207.5 11207.5
11178.5 11182.5
11178.0 11182.5
11177.0 11180.5
11176.5 11180.5
11162.5 11166.5
11157.0 11159.5
11155.0 11159.5
11148.0 11150.0 11150.0
11141.5 11144.5 11144.5
11137.0 11139.5
11136.0 11139.5
11092.5 11095.0 11095.0
11078.0 11080.0 11080.0
11075.5 11077.0 11077.0
11052.0 11053.5 11053.5
11047.0 11049.0 11049.0
11033.0 11035.0 11035.0
11018.5 11021.0 11021.0
10997.5 11000.5 11000.5
10989.5 10993.0 10993.0
10987.0 10989.0 10989.0
10955.0 10956.0
100.0 101.0 102.0
$
REd. ARKS:
CONTAINED HEREIN IS THE RST SIGMA DATA ACQUIRED ON
BP EXPLORATIONWELL C-26 ON 18-MAY-98. THE DEPTH SHIFTS
SHOWN ABOVEREFLECT RST SIGMA PASS #1 GRCH TO THE BASE-
LINE GAM~A RAY GR.DIL; AND RST SIGMA PASS #1 SIGM TO
GR.DIL. ALL OTHER RST SIGMA CURVES WERE CARRIED WITH
THE SIGM SHIFT.
$
$
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: I
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUmmARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11766.0 10945.0
RST 11786.0 10980.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
..............
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH RST
..............
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR RST SIGMA PASS #1. NO PASS TO PASS SHIFTS WERE
APPLIED TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 92
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
TYPE REPR CODE VALUE
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
NBAC RST CPS 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
FBAC RST CPS 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SBNA FIL CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SFNA FIL CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SBFA FIL CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SFFA FIL CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
TRAT FIL 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
IRAT FIL 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
CIRNFIL 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
CIRFFIL 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
BSALRST PPK 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SIBF RST CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
TPHI RST PU-S 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SFFC RST CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SFNC RST CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
SIGM RST CU 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
DSIG RST 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
FBEF RST UA 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
CRRARST 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH RST GAPI 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
TENS RST LB 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
CCL RST V 1224585 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 11802.000 NBAC.RST -999.250 FBAC. RST -999.250 SBNA.FIL
SFNA.FIL -999.250 SBFA.FIL -999.250 SFFA.FIL -999.250 TRAT. FIL
IRAT. FIL -999.250 CIRN. FIL -999.250 CIRF. FIL -999.250 BSAL.RST
SIBF.RST -999.250 TPHI.RST -999.250 SFFC. RST -999.250 SFNC.RST
-999.250
-999.250
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
SIGM. RST -999.250 DSIG.RST
GRCH.RST -999.250 TENS.RST
DEPT. 10950.000 NBAC.RST
SFNA.FIL -999.250 SBFA.FIL
IRAT. FIL -999.250 CIRN. FIL
SIBF. RST -999.250 TPHI.RST
SIGM. RST -999.250 DSIG.RST
GRCH.RST 54.392 TENS.RST
-999.250 FBEF. RST
-999.250 CCL.RST
-999.250 FBAC. RST
-999.250 SFFA.FIL
-999.250 CIRF. FIL
-999.250 SFFC. RST
-999.250 FBEF. RST
-999.250 CCL.RST
-999.250 CRRA.RST
-999.250
-999.250 SBNA.FIL
-999.250 TRAT. FIL
-999.250 BSAL.RST
-999.250 SFNC.RST
-999.250 CRRA.RST
-999.250
1. 983
-999.250
-999.250
-999.250
-999.250
2.132
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE h-OMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREHENT: 0.5000
FILE SUN, VARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 11766.0 10965.0
RST 11786.0 10990.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
BASELINE DEPTH
..............
88888.0
11776.5
11771.0
11763.0
11757.5
11754.0
11741.5
11732.0
11729.5
11721.0
11719.5
11694.5
11679.5
11673.0
11645.0
11636.5
11627.0
11626.5
11607.0
11589.5
11561.5
11555.5
11543.0
11539.0
11521.5
11496.0
11482.0
11477.0
11466.5
11458.5
11438.0
11417.0
11406.0
11404.5
11373.5
11363.5
11355.0
11340.0
11339.0
11317.0
11306.5
11297.0
11295.5
11282.0
11280.5
11273.0
11272.0
11256.0
11251.5
11240.0
11225.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH RST
..............
88889.5 88891.0
11779.5
11773.0
11765.0
11759.5
11755.5
11744.0
11733.5
11721.0
11635.5
11628.0
11408.5
11342.0
11301.0
11285.0
11276.5
11260.0
11229.0
11732.0
11723.0
11696.0
11680.5
11675.5
11649.0
11639.0
11628.0
11609 0
11592 0
11564 5
11558 0
11544 5
11539 5
11522 0
11497 0
11485 0
11480 0
11469.5
11462.0
11442.0
11421.5
11408.5
11377.0
11366.5
11359.0
11342.0
11321.5
11310.5
11301.0
11285.0
11276.5
11255.5
11244.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
11224.0
11218.5
11215.0
11205.5
11203.0
11197.0
11179.0
11178.0
11171.5
11155.5
11147.5
11141 5
11139 0
11137 0
11135 5
11129 0
11119 5
11112.0
11099.5
11093.0
11090.5
11084.0
11077.0
11075.0
11074.0
11067.5
11064.0
11056.5
11052.0
11048.5
11047.0
11045.5
11019.0
11018.5
11006.0
10996.0
10993.0
100.0
$
11227.0
11207.5
11182.5
11144.5
11140.0
11095.5
11077.0
11054.0
11049.5
11021.5
103.0
11229.0
11225.0
11222.0
11210.5
11201.5
11183.5
11175.5
11160.0
11150.5
11142.5
11139.5
11133.0
11123.5
11115.0
11103.0
11093.0
11085.0
11079.5
11076.0
11070.0
11066.0
11059.5
11050.5
11047.5
11021.5
11009.0
10998.5
10996.5
103.5
R~9~ARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
FOR RST SIGMA PASS #2. THE DEPTH SHIFTS SHOWN ABOVE
REFLECT RST SIGMA PASS #2 GRCH TO RST SIGMA PASS #1
GRCH; AND RST SIGMA PASS #2 SIGM TO RST SIGMA PASS #1
SIGM. ALL OTHER RST SIGMA CURVES WERE CARRIED WITH THE
SIGM SHIFT.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
I5-JUN-1998 15:06
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
NBAC RST CPS 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
FBAC RST CPS 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SBNA FIL CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SFNA FIL CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SBFA FIL CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SFFA FIL CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT FIL 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
IRAT FIL 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
CIRNFIL 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
CIRF FIL 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
BSALRST PPK 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SIBF RST CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI RST PU-S 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SFFC RST CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SFNC RST CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
SIGM RST CU 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
DSIG RST 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
FBEF RST UA 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
CRRARST 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH RST GAPI 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
TENS RST LB 1224585 O0 000 O0 0 2 1 1 4 68 0000000000
CCL RST V 1224585
O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
10
** DATA **
DEPT. 11810.500 NBAC.RST
SFNA.FIL -999.250 SBFA.FIL
IRAT. FIL -999.250 CIRN. FIL
SIBF.RST -999.250 TPHI.RST
SIGM. RST -999.250 DSIG.RST
GRCH.RST -999.250 TENS.RST
DEPT. 10960.000 NBAC.RST
SFNA.FIL -999.250 SBFA.FIL
IRAT. FIL -999.250 CIRN. FIL
SIBF.RST -999.250 TPHI.RST
SIGM. RST -999.250 DSIG.RST
GRCH.RST -999.250 TENS.RST
-999.250 FBAC. RST
-999.250 SFFA.FIL
-999.250 CIRF. FIL
-999.250 SFFC.RST
-999.250 FBEF. RST
-999.250 CCL.RST
-999
-999
-999
-999
-999
-999
250 FBAC.RST
250 SFFA.FIL
250 CIRF. FIL
250 SFFC. RST
250 FBEF. RST
250 CCL.RST
-999.250 SBNA.FIL
-999.250 TRAT. FIL
-999.250 BSAL.RST
-999.250 SFNC.RST
-999.250 CRRA.RST
-999.250
-999.250 SBNA.FIL
-999.250 TRAT. FIL
-999.250 BSAL.RST
-999.250 SFNC.RST
-999.250 CRRA.RST
-999.250
-999.250
-999.250
-999.250
-999.250
1.993
-999.250
-999.250
-999.250
-999.250
2.128
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 3
AVERAGED CURVES
Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average
of edited static baseline passes for all other curves.
DEPTH INCREMENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
RST 1, 2,
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE: 11
REFIARKS: THE ARITHMETIC AVERAGE OF THE TWO RST SIGMA PASSES WAS
CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE
APPLIED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 84
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX)
DEPT FT 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
NBAC RST CPS 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
FBAC RST CPS 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SBNA RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SFNA RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SBFA RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SFFA RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
TRAT RSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
IRAT RSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
CIRNRSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
CIRF RSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
BSALRSAV PPK 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SIBF RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
TPHI RSAV PU-S 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SFFC RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
SFNC RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE: 12
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
SIGM RSAV CU 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
DSIG RSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
FBEF RSAV UA 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
CRRARSAV 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH RST GAPI 1224585 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 11787.500 NBAC.RST 3016.340 FBAC.RST 4183.223 SBNA.RSAV
SFNA.RSAV 22. 840 SBFA.RSAV 52. 008 SFFA.RSAV 20. 385 TRAT.RSAV
IRAT. RSAV O. 491 CIRN. RSAV O. 831 CIRF. RSAV 1 . 869 BSAL.RSAV
SIBF. RSAV 53 . O14 TPHI.RSAV 25. 056 SFFC. RSAV 18. 096 SFNC.RSAV
SIGM. RSAV 18. 046 DSIG.RSAV 1 . 452 FBEF. RSAV 62. 470 CRRA.RSAV
GRCH. RST -999 . 250
62. 537
O. 892
85. 710
18. 828
1. 999
DEPT. 10950.000 NBAC.RST -999.250 FBAC. RST -999.250 SBNA.RSAV -999.250
SFNA.RSAV -999.250 SBFA.RSAV -999.250 SFFA.RSAV -999.250 TRAT.RSAV -999.250
IRAT. RSAV -999.250 CIRN. RSAV -999.250 CIRF. RSAV -999.250 BSAL.RSAV -999.250
SIBF.RSAV -999.250 TPHI.RSAV -999.250 SFFC. RSAV -999.250 SFNC.RSAV -999.250
SIGM. RSAV -999.250 DSIG.RSAV -999.250 FBEF. RSAV -999.250 CRRA.RSAV -999.250
GRCH.RST 54.392
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06 PAGE: 13
FILE HEADER
FILE NUMBER 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INC~: 0.5000
FILE SUF~VlARY
VENDOR TOOL CODE START DEPTH
...........................
RST 11802.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
..........
10922.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAMMA RAY
RST RESEVOIR SATURATION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
18-MAY-98
8C0- 609
1115 18-MAY-98
11821.0
0.0
11000.0
11810.0
2400.0
NO
TOOL NUMBER
...........
CGRS-A
RST-A
8.500
11915.0
SEA WATER
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
14
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS CBL DATED 11-5-82.
LOGGED AFTER FLUID PACKED AND PUMPED.
SEA WATER @ 1/2 BBLS/MIN DURING LOG.
SIGMA PASSES LOGGED @ 2400'~HR &C/O @ 200'/HR.
THIS FILE CONTAINS THE RAW RST SIGMA DATA FOR
PASS #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 380
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CS PS1 F/HR 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TENS PS1 LB 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE: 15
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
NPHVPS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
NPDE PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
NSCE PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CRRA PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
NSCR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
AQTMPS1 S 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CHV PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CPSV PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CP2V PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CM2V PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RCFR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RCLC PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RCRC PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RCAKPS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RTDF PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FPHVPS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FPDE PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FSCE PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FSCR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
AQTF PS1 S 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SF6P PS1 PSIG 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
HVPV PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BMCU PS1 UA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
GDCU PS1 MA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
EXCU PS1 UA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
NBEF PS1 UA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FBEF PS1 UA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
NPGF PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FPGF PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BSTR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BSPR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
MARC PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
XHV PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
XP5V PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
XP2V PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
X~2V PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RXFR PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RXLC PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RXRC PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RXAKPS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SHCU PS1 MA 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BSALPS1 PPK 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BSAL SIG PPK 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CIRNPS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CIRF PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CIRNFIL 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CIRF FIL 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
DSIG PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FBAC PS1 CPS 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
IRAT PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
IRAT FIL 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE: 16
NA~IE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
NBAC PS1 CPS 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFNA PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFFA PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBNA PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBFA PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFNA SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFFA SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBNA SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBFA SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFNA FIL CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFFA FIL CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBNA FIL CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SBFA FIL CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIBF PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFNC PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SFFC PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIGM PS1 CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIBF SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIGM SIG CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIGM R2P CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
SIBH R2P CU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TRAT PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TRAT SIG 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TRAT FIL 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
GR PS1 GAPI 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CRNI PS1 KHZ 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CRFI PS1 KHZ 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RDIX PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RSCS PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CTM PS1 DEGC 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
XTM PS1 DEGC 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TAV PS1 KV 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
FICU PS1 AMP 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CACU PS1 AMP 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BUST PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
BUSP PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
RSXS PS1 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TPHI PS1 PU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TPHI SIG PU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
TPHI R2P PU 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
CCLC PS1 V 1224585 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 11802.000 CS.PS1 1554.404 TENS. PSI 1795.000 NPHV. PS1 1506.349
NPDE. PS1 1469.308 NSCE. PS1 2.482 CRRA.PS1 1.983 NSCR.PS1 -0.136
AQTM. PS1 0.661 CHV. PS1 200.370 CPSV. PS1 5.050 CP2V. PS1 12.158
CM2V. PS1 -12.231 RCFR.PS1 0.000 RCLC. PS1 0.000 RCRC. PS1 0.000
RCAK. PS1 0.000 RTDF. PS1 0.000 FPHV. PS1 1523.439 FPDE. PS1 1492.883
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
17
FSCE. PS1
HVPV. PS1
NBEF. PS1
BSTR. PS1
XP5V. PS1
RXLC. PS1
BSAL. PS1
CIRN. FIL
IRAT. PS1
SFFA. PS1
SFFA. SIG
SFFA. FIL
SFNC. PSI
SIGM. SIG
TRAT. SIG
CRFI. PS1
XTM. PS1
BUST. PS1
TPHI. SIG
2.337
161. 621
30. 813
15. 082
5.089
0.000
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999 250
-999 250
-999 250
224 898
87 402
0 000
-999 250
FSCR.PS1 -0.204 AQTF. PS1
BMCU. PS1 34.570 GDCU. PS1
FBEF. PS1 61.105 NPGF. PS1
BSPR.PS1 1.045 MARC. PSI
XP2V. PS1 12.188 X~2V. PS1
R32RC.PS1 0.000 RXAK. PS1
BSAL.SIG -999.250 CIRN. PS1
CIRF. FIL -999.250 DSIG. PS1
IRAT. FIL -999.250 NBAC. PS1
SBNA.PS1 -999.250 SBFA.PS1
SBNA.SIG -999.250 SBFA.SIG
SBNA.FIL -999.250 SBFA.FIL
SFFC.PS1 -999.250 SIGM. PS1
SIGM. R2P -999.250 SIBH. R2P
TRAT. FIL -999.250 GR.PS1
RDIX. PS1 117970.000 RSCS.PS1
TAV. PS1 94.888 FICU. PS1
BUSP.PS1 0.000 RSXS. PS1
TPHI.R2P -999.250 CCLC. PS1
0.661 SF6P. PS1
61.323 EXCU. PS1
0.999 FPGF. PS1
0.000 XHV. PS1
-12.368 RXFR.PS1
0.000 SHCU. PS1
-999.250 CIRF. PS1
-999.250 FBAC. PS1
-999.250 SFNA.PS1
-999.250 SFNA.SIG
-999.250 SFNA.FIL
-999.250 SIBF. PS1
-999.250 SIBF. SIG
-999.250 TRAT. PS1
20.037 CRNI.PS1
8459.000 CTM. PS1
2.393 CACU. PS1
8878.000 TPHI.PS1
-0.010
130. 372
2. 762
O. 995
199.885
0.000
37.072
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
445.984
87.891
2.515
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
18
VENDOR TOOL CODE START DEPTH
...........................
RST 11810.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
STOP DEPTH
..........
10960.5
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
18-MAY-98
8C0-609
1115 18-MAY-98
11821.0
0.0
11000.0
11810.0
2400.0
NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAFR4A RAY
RST RESEVOIR SATURATION
$
TOOL NUMBER
...........
CGRS-A
RST-A
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
8.500
11915.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE T~PERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
19
TOOL STANDOFF (IN):
REFIARKS: CORRELATED TO SWS CBL DATED 11-5-82.
LOGGED AFTER FLUID PACKED AND PUMPED.
SEA WATER @ 1/2 BBLS/MIN DURING LOG.
SIGMA PASSES LOGGED @ 2400'~HR & C/O @ 200'~HR.
THIS FILE CONTAINS THE RAW RST SIGMA DATA FOR
PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 380
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
.......................................................................................
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
.......................................................................................
DEPT FT 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CS PS2 F/HR 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS2 LB 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NPHVPS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NPDE PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NSCE PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CRRA PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NSCR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
AQTMPS2 S 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CHV PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CP5V PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE: 20
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX)
CP2V PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CM2V PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RCFR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RCLC PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RCRC PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RCAKPS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RTDF PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FPHVPS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FPDE PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FSCE PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FSCR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
AQTF PS2 S 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SF6P PS2 PSIG 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
HVPV PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BMCU PS2 UA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
GDCU PS2 MA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
EXCU PS2 UA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NBEF PS2 UA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FBEF PS2 UA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NPGF PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FPGF PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BSTR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BSPR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
MARC PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
XHV PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
XPSV PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
XP2V PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
XM2V PS2 V 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RXFR PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RXLC PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RXRC PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RXAKPS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SHCU PS2 MA 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BSAL PS2 PPK 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BSAL SIG PPK 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CIRNPS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CIRF PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CIRNFIL 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CIRF FIL 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
DSIG PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FBAC PS2 CPS 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
IRAT PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
IRAT FIL 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
NBAC PS2 CPS 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFNA PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFFA PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SBNA PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SBFA PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFNA SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFFA SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SBNA SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
21
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
SBFA SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFNA FIL CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFFA FIL CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SBNA FIL CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SBFA FIL CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIBF PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFNC PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SFFC PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM PS2 CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIBF SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM SIG CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM R2P CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
SIBH R2P CU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT SIG 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT FIL 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS2 GAPI 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CRNI PS2 KHZ 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CRFI PS2 KHZ 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RDIX PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RSCS PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CTM PS2 DEGC 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
XTM PS2 DEGC 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TAV PS2 KV 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
FICU PS2 AMP 1224585 O0 000 O0 0 5 I 1 4 68 0000000000
CACU PS2 AMP 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BUST PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
BUSP PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
RSXS PS2 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TPHI PS2 PU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TPHI SIG PU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
TPHI R2P PU 1224585 O0 000 O0 0 5 1 1 4 68 0000000000
CCLC PS2 V 1224585
O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 11810.500 CS.PS2 2396.804 TENS.PS2 1098.000 NPHV. PS2
NPDE.PS2 1471.215 NSCE. PS2 2.417 CRRA.PS2 1.993 NSCR.PS2
AQTM. PS2 0.661 CHV. PS2 200.854 CPSV. PS2 5.030 CP2V. PS2
CM2V. PS2 -12.231 RCFR.PS2 0.000 RCLC. PS2 0.000 RCRC. PS2
RCAK. PS2 0.000 RTDF. PS2 0.000 FPHV. PS2 1538.087 FPDE. PS2
FSCE. PS2 2.019 FSCR.PS2 0.056 AQTF. PS2 0.661 SF6P.PS2
HVPV. PS2 163.086 BMCU. PS2 36.035 GDCU. PS2 59.356 EXCU. PS2
NBEF. PS2 31.076 FBEF. PS2 61.934 NPGF. PS2 1.001 FPGF. PS2
BSTR.PS2 15.517 BSPR.PS2 1.161 MARC. PS2 0.000 XHV. PS2
XP5V. PS2 5.089 XP2V. PS2 12.202 X~2V. PS2 -12.328 RXFR.PS2
RXLC.PS2 0.000 RXRC. PS2 0.000 RXAK. PS2 0.000 SHCU. PS2
BSAL.PS2 -999.250 BSAL.SIG -999.250 CIRN. PS2 -999.250 CIRF. PS2
CIRN. FIL -999.250 CIRF. FIL -999.250 DSIG.PS2 -999.250 FBAC.PS2
1506.349
-0.036
12.158
0.000
1496.965
135.233
3.156
1.001
200.127
0.000
38.373
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
22
IRAT. PS2 -999.250 IRAT. FIL
SFFA.PS2 -999.250 SBNA.PS2
SFFA.SIG -999.250 SBNA.SIG
SFFA.FIL -999.250 SBNA.FIL
SFNC.PS2 -999.250 SFFC. PS2
SIGM. SIG -999.250 SIGM. R2P
TRAT. SIG -999.250 TRAT. FIL
CRFI. PS2 230.933 RI)IX. PS2
XTM. PS2 83. 496 TA V. PS2
BUST. PS2 0 . 000 BUSP. PS2
TPHI.SIG -999.250 TPHI.R2P
DEPT. 10960.000 CS.PS2
NPDE.PS2 1469.156 NSCE. PS2
AQTM. PS2 0.441 CHV. PS2
CM2V. PS2 -12.231 RCFR.PS2
RCAK.PS2 0.000 RTDF. PS2
FSCE.PS2 2.005 FSCR.PS2
HVPV. PS2 162.940 BMCU. PS2
NBEF. PS2 28.738 FBEF. PS2
BSTR.PS2 17.290 BSPR.PS2
XP5V. PS2 5.086 XP2V. PS2
RXLC.PS2 0.000 RXRC. PS2
BSAL.PS2 106.113 BSAL.SIG
CIRN. FIL 0.308 CIRF. FIL
IRAT. PS2 0.474 IRAT. FIL
SFFA.PS2 43.244 SBNA.PS2
SFFA.SIG 1.970 SBNA.SIG
SFFA.FIL 45.685 SBNA.FIL
SFNC.PS2 43.703 SFFC.PS2
SIGM. SIG 1.588 SIGM. R2P
TRAT. SIG 0.050 TRAT. FIL
CRFI.PS2 209.250 RDIX. PS2
XTM. PS2 71.191 TA V. PS2
BUST. PS2 0 . 000 BUSP. PS2
TPHI.SIG 2.369 TPHI.R2P
-999.250 NBAC. PS2
-999.250 SBFA.PS2
-999.250 SBFA.SIG
-999.250 SBFA.FIL
-999.250 SIGM. PS2
-999.250 SIBH. R2P
-999.250 GR.PS2
145441.000 RSCS. PS2
95.031 FICU. PS2
0.000 RSXS.PS2
-999.250 CCLC. PS2
2557 074
2 345
200 370
0 000
0 000
-0 034
32.578
61.143
1.109
12.199
0.000
3.528
0.558
0.476
66.823
4.246
65.353
41.252
-999.250
1.165
163519.000
94.974
0.000
-999.250
TENS.PS2
CRRA.PS2
CP5V. P$2
RCLC. PS2
FPPIV. PS2
AQTF. PS2
GDCU. PS2
NPGF. PS2
MARC. PS2
X~2V. PS2
RXAK. PS2
CIRN. PS2
DSIG.PS2
NBAC. P$2
SBFA.PS2
SBFA.SIG
$BFA.FIL
SIGM. P$2
SIBH. R2P
GR.PS2
RSCS.PS2
FICU. PS2
RSXS. PS2
CCLC. P$2
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
596.667
8459.000
2.310
8878.OOO
-0.048
1541.000
2.128
5. 069
O. 000
1530.763
0.661
60.012
0.993
0.000
-12.405
0.000
0.305
2.316
2195.900
48.334
5.071
50.798
41.179
-999.250
68.113
8459.000
2.311
8878.000
-999.250
SFNA.PS2
SFNA.SIG
SFNA.FIL
SIBF. PS2
SIBF. SIG
TRA T. PS2
CRNI. PS2
CTM. PS2
CACU. PS2
TPHI.PS2
NPHV. PS2
NSCR.PS2
CP2V. PS2
RCRC. PS2
FPDE. PS2
SF6P.PS2
EXCU. PS2
FPGF. PS2
XHV. PS2
RXFR.PS2
SHCU. PS2
CIRF. P$2
FBAC.PS2
SFNA.PS2
SFNA.SIG
SFNA.FIL
SIBF. PS2
SIBF.SIG
TRAT. PS2
CRNI. PS2
CTM. PS2
CACU. PS2
TPHI.PS2
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
460.240
82.520
2.515
-999.250
1496.583
-0.075
12.173
0.000
1497.308
131.933
3.787
1.000
200.079
0.000
44.097
0.586
3409.302
48.768
1.928
48.264
60.826
1.368
1.162
445.209
72.754
2.501
44.454
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/06/12
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-JUN-1998 15:06
PAGE:
23
**** TAPE TRAILER ****
SERVICE NAFIE : EDIT
DATE : 98/06/12
ORIGIN : FLIC
TAPE NAME : 98246
CONTINUATION # : 1
PREVIOUS TAPE :
COFWIF2Fr : BP EXPLORATION, C-26, PRUDHOE BAY, API# 50-029-20834-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/06/12
ORIGIN : FLIC
REEL NAME : 98246
CONTINUATION # :
PREVIOUS REEL :
COI~I~ENT : BP EXPLORATION, C-26, PRUDHOE BAY, API# 50-029-20834-00
DVP OIO,,H01 VgRIF1CATi()N LI'~T.[NG PAGE
** REEL HEADER **
SERVICE NAME :SERVIC
DATE :82/11/10
ORIGIN :
REEL NAME :117~74
CONTINUATION # 50!
PREVIOUS REEL :
COMMENTS :LIBRARY TAPE
** TAPE HEADER **
SERVICE NA~E :$ERVIC
DATE :82/11/10
ORIGIN :6603
TAPE NAME
CONTINUATION ~ :01
PREVIOUS TAPE :
COMMENTS :LIBRARY TAPE
~**~~ EOF
** FIDE HEADER **
FILE NA~E:$ERVIC,O01
SERVICE NAME :
VERSION # ~ :
DATE, · 0
MAXi:t!~.U~ LENGTH., I 24
FI~E TYPE : ·
CONTENTS
· .
ALASKA
DVP 010,MOl V~][ilFICATI{JN I.~ISTIhG PA(.;~] ~
RECORD TYPE 047 **
RECORD TYPE 047 $*
** COMMENTS **
· SCHLUMBERGE~
, ALASKA COMPUTING CENTER
*******************************************************************************
COMPANY = SOHIO ALASKA PETROLEUM COMPANY
WELL = C-26
FIELD = PRUDHOE BAY
COUNTY = NORTH SLOPE BOROUGH
STATE = ALASKA
NUMBER AT ACC 66033,
CASING = 9 5/8" 10936
TYPE FLUID = GEL/RESINEX
'VISCOSITY m 40,0 $
PH = 10,0
FLUID
RM
R~' :!AT BHT
,560 {a 52'0 DF
550 :~ :52,0
860 ~ 52'0 [,)r
?7o
bVP 010,H01 VERIFICATION LISTING PAGE
MATRIX LIMESTONE
***********~**************************************$****~*~***~*****************
, * * , * , · · , , , · , · , * * , * , , , * , , · , ·
,
· SCHLUMBERGER LOGS INCLUDED wITH THIS MAGNETIC TAPE:
,
· DUAL INDUCTION SPH£RICAbbY FOCUSED bOG (OIL)
· BOREHObE COMPENSATED bOG {BHC)
· FORMATION DENSITY C[]MPEN*ATED bOG (FDC)
· COMPENSATED NEUTRON LOG (CNb)
· GAMMA RAY LOG (GR)
,
**DATA TR *
bVP 010,H01 VERIFI(:ATIOm L][6TING PAGE; 4
ENTRY
q I ~6 1
8 4 73 60
9 4 65 .lin
o ~ 6O 0
DATUM 8PECIFICATIUN BLOCKS
~NEM SERVICE SERVICE UNIT APi API API APl FILE SIZE PROCESS SAMPLE ~EPR
ID ORDER ~ LOG TYPE CLASS MOD NO. LEVEL CODE
OEPT FT 0 0 0 0 0 4 0 ! 6B
SFLU DIL OHMm 7 0 0 0 0 4 0 1 68
ILM DIL OHMM 7 0 0
ILD DIL OHMU 7 12 46 0 0 4 0
SP DIE MV 7 ! 0 0 0 4 0 1 68
GR DIL GAP1 7 31 32 0 0 4 0
NPMI FDN PU 42 68 2 0 0 4 0 1 68
NRAT FDN 42 42 1 0 0 4 0
DRHO FDN G/C3 42 44 0 0 0 4 0 ! 68
RHOB FDN G/C3 42 35 ! 0 0 4 0 1 68
NCNb FDN ,42 34 92 0 0 4 0
FCNL FON 42 34 93 0 0 4 0
CALl FDN IN 42 28 3 0 0 4 0 I 68
GR FDN GAPI 42 ]1 ~2 0 0 4 0 1 6
8
RNRA FDN . 42. :0 0
DT BHC US/F 60 52 32
GR BHC GA'P1 60< ~3I : ~ 0
** DATA
OEP']
DEPT
bVP OIO,HO1 VERIFICATION LISTING PAG5 5
OEP? 11600
SP
DRHO 0
CALl 8
GR 23
0000 SFL~ 12,1719 IbM 7
3125 GR 23,1094 aPHI 26',8906
8.9062
3184 NRAT 2°7949
0073 RHOB 2.2266 NCNb 2946 0000 FCNL 998,5000
7266 GR 23.1094 RNRA 2~9492 DT 94,5625
1094
DEPT 11500
SP -94
DRHO 0
CALI 8
GR 20
0000 SFLU 43.5313 IbM 28,703! IbD 37,4375
0625 GR 20.2500 NPHI 20.9473 f,~RAT 2.4316
0020 [{HOB 2~ 2969 NCNb 31~0,0000 FCNL 1238,0000
6875 GR ~0.2500 RNRA 2.5195 DT 89~1875
2500
DEPT 11400
SP -85
DRHO -0
CALl 8
GR 26
0000 SFLU 85.1875 IbM 67.7500 IbD 124,0625
0000 GR 26,4375 NPHI 14o1113 i'~RAT
oo o RHOB oooo
7578 GR 26,4175 RNRA 2~0~01 DT ,~.. ]750
4~75
DEPT 11300
SP -6~
DRHO
CALl 8
OR 55
0000 SFLU 34,843? IbM 26.04~9 IbD 4~ Z18~
6250 Gt~ 55,2813 NPHI 21.9727 NRAT ~~195
0264 RHOB 2,5352 NCNb 328~.0000 f'CNL 1269.0.000
953i G~ 55.2813 RNRA 2'5879 DT 83.3750
2813
DEP T 11200
SP -74
DRHO 0
8
2:2
8!.62'5:0 IbM 56,'b.2:50: lbD 128.8750
22,4688 NPHI 2!~7773 NRAT 2,4'90~
.4688 'RNRA 2',j5371 DT 98,()00(.~
SP
'"]2
DRHO
CALi
0000
127;
3750 NPH! 35; 9'863 .... ~AT 3 ;5'996
SP -44,
DRHO · "'9.99;
CAbI ' '999,
G~.~': .::. ::::::,: :i~9:99;
812'5 ¢;R 65,3'75'0 NDH! .... ;,:;9"99;'2500 ~q'RA'T 999'
~ ', .:5'0:~::.:::. ::~!N:b:~::: ::; :::::::::::::::::::::::::: '
;2"5'0'0 DT ~ 999 ,
!avP 010,HO1 VERIF'ICA.TI'O~ I,ISTING PA¢'.,E 6
DEPT 106..00i0000 SFbU
SP 79 0625 GR
DRHO -999 2500 RHOB
CALI -999,2500 GR
GR -999,2500
DEPT 10500
SP -95
DRHO -999
CAbI -999
GR -999
DEPT 10400
SP -58
DRHO -999
CALl -999
GR -999
DEPT
~p
DRHO :999
CAbI 999
' 9991
2000,0000 IbM 2000,0000 IhD b,b64i
62.9[375 NPHI -999,2500 NRAT -999;2500
-999 2500 NCNL -999,2500 FCNL -999.2500
-999:2500 RNRA -~99.2500 DT -999,250¢.
2000,0000 ILM 2000,0000 lbD 0,2031
54.53!3 NPHI -999.2500 NRAT -999.2500
-999,2500 NCNL ,,999,2500 FCNL .,999,2500
-999.2500 RNRA -999.2500 DT -999.2500
oooo SfbU 2000,0000 ZbM 2000,0000 ZbD ..~,,~,~
3125 GR 57.7813 NPHI '999,2500 NRAT -999.2500
2500 RHOB -999.2500 NCNb -999,2500 FCNL ,.999,25{)0
2500 GR -999. 2500 RNRA -999. 2500 DT -999. 2500
2500
0000 SFhU 2000,0000 IbM 2000,0000 IbD 7,0156
7813 GR 56.9062 NPHI -999,2500 NRAT -999,2500
-999,~500 FCNb
] oo .c.k
O0 G" '999.2500 R"R '999.2500 DT -999o2500
2 $ 00
9375 GR 60.3750 N '~I <999,2500 N ~T -99'~'}2'2~'~500
9'992250:~
SP
Sp
I
-6
CAb.
LVP OIO,HO1 VERIFICATI(.i}t.~ LISTING PA(;g 7
DEPT 9800.0000 SFLU
SP -72,5625 GR
DRHO -999,2500 RHOB
CALl -999,2500 GR
GR -999.2500
2000.0000 ILM 2000,0000 ILD 5,7695
107,8125 NPHI -999.2500 i~RA~i: -999.250O
-999.2500 NCNL -999 2500 FCNL -999 25{0
-9Q9 . 2500 RNRA -999. 2500 {)T -999. 2506
DEPT 9700
SP -59
DRHO -999
CALl -999
GR -999
0000 SFLU 2000 0000 IbM 2000.0000 ILD - 2734
0313 GR 90i~250 NPH! -999.250O ~RAT -99~:2500
2500 RH00 -999 500 NCNL -999,2500 FCNL -999,2500
2500 GR -999. 2500 RNRA -999. 2500 DT -999 · 2501~
2500
OEPT 9600
SP -61
DRHO -999
CAL! -999
GR -999
oooo ooo:o ooo .ooo.oooo
5313 GR 56 625 NPH! 999.2500 NRAT -999,2500
2500 RHOB -999,2500 NCNL -999 2500 FCNL -999,2500
2500 GR -999.2500 RNRA -999'.2500 DT -999.25~0
2500
D£PT 9500
SP -118
DRHO -999
CALl -999
GR -999
0000 I~M 2000,0000 ILD 6,6328
0000 SFLU 2000'3750 NPHI
7500 GR . 79, -999.2500 NRAT -999,2500
500 RHOB 999;2500 NCN5 -999,2500 FCNL -999~2.500
500 GR -999,2500 RNRA -999.2500 DT -999,2500
2500
DgPT 9~00
SIP 31
DR:HO : -999
0000. SF[~:U 2000'0000 :I:5M ~000,0000 I[~D 9~. ,1719
5156(;R 89,5000 NPHI 999.2500 NRAT -9 ,250()
2500 RH.OB : NCNL:: :~9:99'~500 ' '999,2500
2500 GR '999' ~500 RNRA -999 i2500 D:F -999, ~500
SP
8t25 GR 82,4375 ~PHI '9'99,250ON'RAT -999;2500
2'500GR ~999;"250'0.. 999 ;2500 DT "999;25o~
TAPE
,_,VP OIO..UI VF~RIFICATIO~ LI~JT.I}~(; PAGE
CONTINUATION # ~01
NEXT TAPE NAME :
COMMENTS ILIBRARY TAP~
S£RVICE NAME :S~RVIC
DATE {82/11/10
ORIGIN ~
REEL NAM£ ~I17674
CONTINUATION # ~01
N~XT ~Eb NAME ~
COMMENTS CI, IB~ARY TAPE