Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
185-296
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Sunday, January 26, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC C-19 MILNE PT UNIT C-19 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/26/2025 C-19 50-029-21504-00-00 185-296-0 G SPT 6948 1852960 1737 3554 3557 3554 3554 283 283 283 283 4YRTST P Austin McLeod 12/15/2024 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT C-19 Inspection Date: Tubing OA Packer Depth 579 1933 1910 1903IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM241215182652 BBL Pumped:1.7 BBL Returned:1.7 Sunday, January 26, 2025 Page 1 of 1 9 9 9 9 9 9 9 9 9 99 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.01.26 23:08:11 -09'00' Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 12/30/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-19 (PTD 185-296) IPROF 12/10/2021 Please include current contact information if different from above. Received By: 01/03/2022 37' (6HW By Abby Bell at 9:51 am, Jan 03, 2022 MEMORANDUM TO: Jim Regg P.I. Supervisor �C r-' FROM: Adam Earl Petroleum Inspector Well Name MILNE PT UNIT C-19 Insp Num: mitAGE201220122049 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, December 24, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp Alaska, LLC C-19 MILNE PT UNIT C-19 Src: Inspector Reviewed B P.I. Suprv�� Comm API Well Number 50-029-21504-00-00 Inspector Name: Adam Earl Permit Number: 185-296-0 Inspection Date: 12/19/2020 i Thursday, December 24, 2020 Page 1 of 1 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well C-19 TypeW TVD J 6948 - TUbin 1737 g ]740 ' 1747 ' 1745 1742 1742 - 1 52960 T e Test' SI'T yp (Test Sl p 1737 IA 512 2390 - 2398 '' 2363 j 2356 2352 ' BBL humped: 2 3 _BBI. RetUrnetl: 2.3 - QA 336 336 337 337 336 335 Intervale 4YRTST P/F P Notes: MIT [A Thursday, December 24, 2020 Page 1 of 1 Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 12/04/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-19 (PTD 185-296) Injection Profile 09/27/2020 Please include current contact information if different from above. Received by the AOGCC 12/04/2020 PTD: 1852960 E-Set: 34366 Abby Bell 12/09/2020 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,December 07,2016 TO: Jim Regg r P.I.Supervisor ' jl z/14'' SUBJECT: Mechanical Integrity Tests ` HILCORP ALASKA LLC C-I9 FROM: Bob Noble MILNE PT UNIT KR C-19 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry-jg,e— NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT KR C-19 API Well Number 50-029-21504-00-00 Inspector Name: Bob Noble Permit Number: 185-296-0 Inspection Date: 12/2/2016 Insp Num: mitRCN161202151700 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well C-19 ,Type Inj W TVD 6948 Tubing 720 720 - 720. 720 - PTD I 1852960 - Type Test SPT Test psi 1737 - IA 360 2020 - 2000 - 1995 - Interval 4YRTST P/F P v OA 515 515 - 515 515 - Notes: SCANNED APR 0 61/. Wednesday,December 07,2016 Page 1 of 1 WELL LO TRANSMITTAL SMIT°TAL NoAcTivE DiAgNoAc SERAM, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793 -1225 RE: Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 -1 900 Benson Blvd. Anchorage, Alaska 99508 and UDC —tom ProActive Diagnostic Services, Inc Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 § NOV 2 Fax: (907) 245 -8952 1 J Injection Profile 05-Sep-1 MPU G19 BL / EDE 50 -029- 2150400 2) Gas Lift Survey 20-Sep-1 MPU C -05A BL / E x 01 Signed: Date - Alaska ' s ll Gas s " ai Print Name:,_;_ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD Su ITE C, ANCHORAGE AK 99518 PHONE: (907)245 -8951 FAx: (907)245 -88952 E- MAIL : pdsanchorageOmemorvloa.com WES31TE : www.memorvlog.com CADocuments and Settings\Diane Williams\Desktop \Transmit_BP.docx STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMI~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate~ Other ~ gRIGHT WATER Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver~ Time Extension ~ Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well ~ 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: rvame: Development (~R Exploratory ~~ ~ss-2sso ~ 3. Address: P.O. Box 196612 Stratigraphic I`~ Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-21504-00-00 / 7. KB Elevation (ft): 9. Weil Name and Number: 52 KB MPC-19 v 8. Property Designation: 10. Field/Pool(s): ADLO-047434 / MILNE POINT UNIT Field/ KUPARUK RIVER SANDS Pooi 11. Present Well Condition Summary: Total Depth measured 12200 feet ~/~ Plugs (measured) None ~~ true vertical ( feet~ Junk (measured) None Effective Depth measured 12110 feet true vertical 7396 feet Casing Length Size MD TVD Burst Collapse Conductor 80 13-3/8" 48# H-40 SurFace - 115 Surface - 115 1740 750 SurFace 6888 9-5/8" 36# K-55 Surface - 6923 Surface - 4637 3520 2020 Production 12217 7" 26# L-80 Surface - 12250 Surface - 7485 7240 5410 ~ ~ ~ir ;tir~. .; ,i ~ « ~ .~~. : ~_ Ww- Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: {size, grade, and measured depth) 3-1/2" 9.3# L-80 SURFACE - 11239' o O ~~ Packers and SSSV (type and measured depth) 7"X3-1/2 S-3 BAKER PKR 11201' ~--y~' ~ ~ 7 0 0 0 0 < ,.-::. 0 0 ~ ~ ~:.' 12. Stimulation or cement squeeze summary: ,- r- ff3 ~ 4 i,t~1 Intervals treated (measured): ~~ '~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 2303 160 Subsequent to operation: 2306 200 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory I~ Development ~ Service ~ Daily Report of Weil Operations X 16. Well Status after proposed work: Oil ~ Gas 1! WAG r GINJ ~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 9/10/2009 Form 10-404 ~vised 04/2006 ~ N ~ *" ~; i; 2~~F Submit Original Only ~.~y:~~.. ~~~ ~ ~ ~ cr ~ ~~ ~~~~ M PC-19 185-296 PFRF OTTO[:MENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPC-19 12/12/85 PER 11,478. 11,498. 7,087.77 7,097.64 MPC-19 12/28/85 PER 11,780. 11,800. 7,236.63 7,246.35 MPC-19 12/28/85 PER 11,598. 11,602. 7,146.88 7,148.85 MPC-19 12/28/85 PER 11,800. 11,819. 7,246.35 7,255.56 MPC-19 12/28/85 PER 11,553. 11,557. 7,124.72 7,126.69 MPC-19 12/28/85 PER 11,561. 11,578. 7,128.66 7,137.03 MPC-19 9/30/89 RPF 11,737. 11,751. 7,215.58 7,222.45 MPC-19 9/30/89 RPF 11,751. 11,770. 7,222.45 7,231.75 MPC-19 5/10/95 PER 11,780. 11,820. 7,236.63 7,256.04 MPC-19 5/10/95 PER 11,478. 11,498. 7,087.77 7,097.64 MPC-19 5/10/95 PER 11,738. 11,764, 7,216.07 7,228.82 MPC-19 5/10/95 PER 11,866. 11,876, 7,278.35 7,283.19 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LtNER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ # ~ MPC-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 7/21/09 - 8/9/2009 ~ Bright Water pump operations. Began EC9378A (polymer) injection on 07/24/09 with a water ate 2263 BWPD and iniection pressure of 2518 psi. Finished pumping 08/08/09 with a water iniection rate of 2303 BWPD and iniection pressure of 2425 psi._Finished pumping EC9360A on 08/09/2009 with a water injection rate of 2306 BWPD and injection pressure of 2426 psi. Total EC9378A injection volume 28804 gallons. Total EC9360A injection volume 9405 gallons. • • t~'~f'~EL LQG T'I~~~If~a~~7TAL .~ ~~~ PeoAcTive Dingn~ostic SesvicES, Inc. To: AOGCC Chris~ine Mahnken 333 W. 7th Ave Suite 10~ Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/orTubing Inspection(Caliper/ MTT'j The technical data listed befow is being submitted herewith. Please acknowledge receipt by re~turning a signed copy of this tr~ansmittal letter to the following : BP Exploration (Alaskaj, Inc. P~rotechnical Data Center Attn: Joe Lastuflca LR2-1 900 Benson Bhid. -~ ~., Anchorage, Alaska 99508 .~"~~~ ~=~' ~ ~ ~L ~ ~ `' ~ ~ -,=-~ C~ ~ ~~`~~ ~~ and -1'j U t~- 1~55 _., l" .~..~. ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road w; ~'~.~ ~ ~~ i~~ `, ` r (~ • ~" ~ [)~ ~ Suite C Anchorage, AK 99518 Fax (907) 245,8952 1) Leak Detection - WLD 29,Ju1~09 G36A BL / E~ 54029-21790-01 2) Injection Profile 26,1u~09 MPU G19 *reprint* BL./ E~ ; Signed : Print Name: 50-029-21790-0 - ~ Date PROACTIVE DlRGNOSTlC SERVICES, INC., 130 W. INTEW~WTIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PNONE: (907)245-8951 FaX: (907)245-88952 E-MAIL: 'a"! . "`°.~ „~'~""~'-+vt's"c. „ WEBSITE 1~! ~.",, °*ro .".9 C:~Doc~m~ents and Settings\Owner~Deskiop\Transmit_BP.docx J~f OPERABLE: MPG19 (PTD #~2960) IA and OA pressure differentia~ Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, July 07, 2009 10:28 AM To: 'NSU, ADW Well Integrity Engineer' Cc: Regg, James B(DOA); Maunder, Thomas E(DOA) Subject: RE: OPERABLE: MPC-19 (PTD #1852960) IA and OA pressure differential Page 1 of 2 ~~ ~ ~, ~ ~~ Anna, Very strange behavior on this well..... tracking IA and OA for a period and then gone after a bleed on the OA. Maybe the higher differential has reseated some seals that weren't holding?? Certainly looks good for now.... Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com~ Sent: Monday, ]uly 06, 2009 1:23 PM To: Regg, James B(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA); NSU, ADW Well Operations Supervisor; Engel, Harry R; Rossberg, R Steven; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; MPU, Field Lead Tech Cc: Quy, Tiffany; Roschinger, Torin T.; NSU, ADW Well Integrity Engineer Subject: OPERABLE: MPC-19 (PTD #1852960) IA and OA pressure differential AI I, Milne Point well MPC-19 (PTD #1852960) is showing good pressure differential between the IA and OA as seen in the attached TIO plot. The well has been reclassified as Operable. Please contact the Well Integrity Coordinator if the pressures begin to equalize. «MPC-19 TIO Plot.doc» Thank you, Anna ~u6e, ~'. E. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 ~i~~~ Jl,j~. ~ ~ ~Q~~ From: NSU, ADW Well Integrity Engineer Sent: Tuesday, )une 30, 2009 9:46 PM To: 'Regg, ]ames B(DOA)'; 'Maunder, Thomas E(DOA)'; 'Schwartz, Guy L(DOA)`; NSU, ADW Well Operations Supervisor; Engel, Harry R; Rossberg, R Steven; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; MPU, Field Lead Tech Cc: NSU, ADW Well Integrity Engineer; Quy, Tiffany; Roschinger, Torin T. Subject: UNDER EVALUATION: MPC-19 (PTD #1852960) Possible IAxOA Communication ~~~~2~~9 OPERABLE: MPG19 (PTD #~2960) IA and OA pressure differentia~ Page 2 of 2 All, MPC-19 (PTD #1852960) is a WAG injector currently on water injection exhibiting possible IAxOA communication as seen on the attached TIO plot. The pressures showed a differential through the month of May but a recent OA bleed on 06/27/09 from 580 psi to 140 psi indicated a potential anomaly when the IA pressure decreased from 640 psi to 580 psi during the bleed. To conduct further diagnostics, the AOGCC has been notified and the well has been reclassified as Under Evaluation. The plan forward is to leave the well on water injection and to conduct an OA repressure test, monitoring for confirmation of communication. An MITIA was conducted and passed on 06/29/09 confirming two barriers. A MITIA form will be submitted to the AOGCC with the monthly form submission. A TIO plot and wellbore schematic has been included for reference. Please Iet us know if there are any questions. Thank you, Anna ~Du6e, ~'. E. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 7/7/2009 ~ MPC-19 (PTD #1852960) TIO Plot u .. .~ f«.~.+...,+. r `i . ,~ • u ~m o¢s • oow ~ a~ • ^• • ~ .• ~ ~~~t~~.~~~~~~^ ~~ ~ ~^ •~~~o ~~ ~~~~N• ^ . ~~~-'~,r--~•.,.,i`~~1~'"~"'~,~-'.~}:-~-~^fy~ ~ ~~;,, ~ ~ ~ ~ ~ ....,, ^ I . . ~~ ~~eG.-~ ~ • a ~aoooo ~~~ ~~ 1 ~ r-. ~ ~ ~ ~ ~ ~ ~ ~ N ~ ~ ~ ~ ~ H ~ `/ ~ r U ~ o~ 0 ~ a o 0 0 0 0 0 0 G O G O V C'I N '- Wellhead: 11" 5M FMC . Tree: FMC 3 1/8" 5M Tbg. hgr: 11" x 3.5" w/ 3.5" NSCT T&B and 3" CIW Type H BPV profile 13-3/8" 48ppf H-40 conductor casing 103' MD 9-5/8" 36 ppf, K-55, Btrc. 6,784' MD surface casing. KOP @ 500' Max Hole Angle: ° @ 'MD 3.5", 9.3ppf, L-80, EUE 8RD mod. (drift ID =2.992", cap. =0.0087 bp 7", 26 ppf, L-80 btrs. csg STIMULATION SUMMARY 9/30/89 - 50.7 M# Ibs. 16-20 ISP PERFORATION SUMMARY REF: LOG: TVD SIZE SPF INTERVAL OPEN/S~ 5" 12 11,478' - 11,498' 7088' - 4" 4 11,478' - 11,498' oper 5 12 11,553'-11,557' 7125'- open 5" 12 11,561' - 11,578' 7129' - open 5" 12 11,598' - 11,602' 7147' - open 2 1/8" 4 11,737-11,770 7216' - 4" 4 11,738-11,764 open 5" 12 11,780' - 11,819' 7237' - 4" 4 11,780' - 11,820' open 4" 4 11,866-11,876 7278'-7283' open KDB-SL 52 KDB-GL 3E ~del S-3 pkr. 11,201 MD nipple, 2.75"' ID 11,226 MD EG 11,239 MD D Tag on 12/28/04 @ 11792' MD ~D Float Shoe 12,110' MD 12,200' MD DATE REV. BY COMMENTS MILNE POINT UNIT 5/13/95 DBR RWO/ PERFS WELL C-191 API NO: . : : ? 504 BP EXPLORATION MPU C-19i ~ ~ ~.::_ ~ ~ f 9~soAca~vE DiayniosTic SeRVicES, lric. Ta: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Ataska 99501 (907J 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT] The technical data listed below is being submitted herewith. PlEase acknowledge receipt by retuming a signed copy of this transmittal letter to the following : BP Exploration (Alaskaj, Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Bhrd. Anchorage, Alaska 99508 and U~C ~~s - ~ ~ i ~ ~~, ~C tg3 -c~~ 1~33~ ProActive Diagnostic Services, Inc. Attn: Robert A. Rich~y 130 West Internatianal Airport Road Suite C t,~k °~ f jn`~ ° Anchorage, AK 99518 _~ ;, '' ~•,~~~ + ~ ~ `-` l.' ~_` _ ~ ` L ~ y Fax: (907) 245,8952 1) Injection Profile 26-Jun-09 MPL1 G19 2] Injection Profile 04-Ju1-Q9 P1~1 ~ ; ~; ; Signed : ~ ~ / BL/ EDE _ , 54-0~9;~:1_5~~4--d0 BL / EDE 5G-029-22363-00 DateF.: Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNA?IONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907~245-8951 FAx: (907~245-88952 ~- ~ E-MAIL: :_________~ _.. :__.__..~_.~ _____. WEBSITE _ . _me_~_.. _ __-. C:~Documenis and SetQngs\Oamer~Desktop\Transmit_BP.docx __.._ ~. ,~. -- - _ __ . TR/~-IflVa~/V// ~~ ProActive Diagnostic Services, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907] 793-1225 RE : Cased Hote/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTI~ The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. P~etrotechnical Data Center Attn: Joe Lastuflca LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99516 Fax: (907] 245-6952 ~~~- r~s5 - ~ ~ t~ ~~/ 1 ] Injection Profile 26-Nov-08 MPC-19 1 Color Log / EDE 50-029-2150400 2] g _ ~ ~ - Signed : Date : _ ~ ~~ ~~~ Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATICNaI. AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 Fax: (907)245-88952 E-MAIL: ~~4s~nch~ragelca~~~a~o~!!®ta.~aa~a WEBSITE: ~nr~;av.rs~er~^+mr~~ag.~~t~~ C:\documents end Settings\Owner\Deskcop\Transmit_BP.docx MEMORANDUM • To: Tim Regg ~~,~ j ~ ~ ~ ~ ~~uu~$ P.I. Supervisor c FROM: Chuck Scheve Petroleum Iuspector State of Alaska • Alaska Oil and Gas Conservation Commission DATE: Wednesday, November Os, 2008 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC C-19 MILNE PT UNIT KR C-19 Src: Inspector NON-CONFIDENTIAL Reviewed B~yj:n P.I. Supr~+~ Comm Well Name• MILNE PT UNIT KR C-19 API Well Number: 50-029-21504-00-00 Inspector Name: Chuck Scheve Insp Num: mitCS081102141424 Permit Number las-296-0 ~ Inspection Date: 11/1/2008 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well C-19 Type Inj. i W ------ TVD ~ 6948 ~ IA T 1130 2500 2480 2480 p T ]852960 ~TypeTOSt ; SPT 'l`est pSl 1737 ~ OA ~ 520 690 ~ i 670 670 Interval aYRTSr p~F _ P i Tubing ~ z6so ~ z6so ------ z6so z6so Notes' Pretest pressures were observed and found stab]e. Wednesday, November Os, 2008 Page I of I t." MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Randy Ruedrich DATE: July 20, 2003 Commissioner .~ i "~:~SUBJECT: Integrity Test TomAMau~er ¢~./~i.~ -~':~1 BPxMechanical P.I. Supervisor MPU C Pad FROM: Chuck Scheve Petroleum Inspector NON- CONFIDENTIAL WellI C-15 P.T.D.I 185-103 'Packer Depth Pretest Initial 15 Min. 30 Min. I I ,nj.IsI T.V.D. 16825 , I , Type test ,Type P .Testpsi, 1706 ,Casing, 900 , 2100 , 2075 . 2075 , P/F , PI_ Notes: Well I C-19 I P.T.D.I 185-296 Notes: WellI P.T.D.I Notes: WellI P.T.D.I Notes: WellI P.T.D.I Notes: I I s I T.V.D. 18120 I TubJng 12700 12700 12700 12700 I Interval 4 I I Type'Typetestlnj'I P I Testpsil 2030 ICasingI 0 I 22o01 216°1 21601 P/F I -PI I IType Inj. Type test IType Inj. Type test IType Inj. Type test Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS I NJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W- Test during Workover O= Other (describe in notes) Test's Details I traveled to BPXs MPU C Pad and witnessed the routine 4year MIT on wells C-15 and C-19. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed for 30 minutes with the both wells demonstrating good mechanical integrity. M.I.T.'s performed: 2 Number of Failures: 0 Attachments: Total Time during tests: 2 hours cc: MIT report form 5/12/00 L.G. 2003-0720 MIT MPU C-19 cs.xls 7~23/2003 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging_ WAG SWAP Pull tubing _ Alter casing _ Repair well _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development I Exploratonjl Stratigraphic._ ServicelX 4. Location of well at surface 3810' FNL, 2328' FEL, Sec. 10, T13N, R10E, UM At top of productive interval 1715' FNL, 937' FEL, Sec. 04, T13N, R10E, UM At effective depth 1236' FNL, 1246' FEL, Sec. 04, T13N, R10E, UM At total depth 1169' FNL, 1287' FEL, Sec. 04, T13N, R10E, UM (asp's 558128, 6029751) (asp's 554169, 6037095) (asp's 553856, 6037572) (asp's 553814, 6037639) Perforate _ Other_X WAG SWAP 6. Datum elevation (DF or KB feet) RKB 50 feet 7. Unit or Property name Miline Point Unit MPC-19 9. Permit number / approval number ,~ 185-296 . 10. APl number 50-029-21504-00 11. Field / Pool Miline Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 6888' Production 12217' 12200 feet Plugs (measured) 7439 feet 12110 feet Junk (measured) 7396 feet Size Cemented Measured Depth True Vertical Depth 13-3/8" 1 oo c.f. cement 115' 115' 9-5/8" 1850 sx PF 'E' & 275 sx 6923' 4637' Class 'G' 7" 350 sx 'G' - 180 sx PF 12250' 7485' Perforation depth: measured Open Perfs 11478'-11498', 11553'-11557', 11561 '-11578', 11598'-11602', 11737'-11770', 11780'-11820', 11866'-11876' true vertical Open Perfs 7088'-7098', 7125'-7127', 7129'-7137', 7147'-7149', 7215'-7232', Tubing (size, grade, and measured depth) 7237'-7256', 7278'-7283' 3-1/2", 9.3#, L-80 TBG to 11239' MD. 7" x 3-1/2" S-3 Baker Packer @ 11201' Packers & SSSV (type & measured depth) 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 02/25/2003 Subsequent to operation 03/01/2003 Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2363 3O03 Tubing Pressure 2748 4653 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil~ Gas~ Suspended~ Service WAG Iniector 17. I hereby ce. rtify that the foregoing is truce and correct to the best of my knowledge. . DeWayne R. Schnorr Form 10-404 Rev 06/15/88 · I BDMS BFL ORIGINAL Date March 03, 2003 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE MPC-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/27/2003 SWAP WELL FROM WATER TO GAS INJECTION. EVENT SUMMARY 02/27/03 WELL SUPPORT TECHS RIGGED UP AND GREASED TREE, FLUSHED SENSOR LINES, SWAPPED BLINDS AND CHECKED ORIFICE PLATE SIZE. ALL FLANGES WERE TORQUED TO SPEC. FESCO RIGGED UP AND PUMPED 2 BBLS METHANOL DOWN WATER LEG. RIGGED UP AND PUMPED 20 BBLS DOWN THE TUBING, PUMPED AT 2 BPM FROM 3900 TO 4400 PSI. JOB WAS COMPLETED WITH NO PROBLEMS. FLUIDS PUMPED BBLS DISCRIPTION 22 METHANOL 22 TOTAL Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate _ WAG SWAP Pull tubing _ Alter casing _ Repair well _ Other_X WAG SWAP 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__ RKB 50 feet 3. Address Exploratow___ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__X Miline Point Unit 4. Location of well at surface 3810' FNL, 2328' FEL, Sec. 10, T13N, R10E, UM (asp's 558128, 6029751) MPC-19 At top of productive interval 9. Permit number / approval number 1715' FNL, 937' FEL, Sec. 04, T13N, R10E, UM (asp's 554169, 6037095) 185-2960 At effective depth 10. APl number 1236' FNL, 1246' FEL, Sec. 04, T13N, R10E, UM (asp's553856, 6037572) 50-029-21504-00 At total depth 11. Field / Pool 1169' FNL, 1287' FEL, Sec. 04, T13N, R10E, UM (asp's 553814, 6037639) Miline Point Unit/Kuparuk River Sands 12. Present well condition summary Total depth: measured 12200 feet Plugs (measured) true vertical 7439 feet Effective depth: measured 12110 feet Junk (measured) true vertical 7396 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 80' 13-3/8" 100 c.f. cement 115' 115' 1850 sx PF 'E' & 275 sx Surface 6888' 9-5/8" 6923' 4637' Class 'G' Production 12217' 7" 350 sx 'G' - 180 sx PF 12250' 7485' Perforation depth: measured Open Perfs 11478'-11498', 11553'-11557', 11561 '-11578', 11598'-11602', 11737'-11770', 11780'-11820', 11866'-11876' true vertical Open Perfs 7088'-7098', 7125'-7127', 7129'-7137', 7147'-7149', 7215'-7232', 7237'-7256', 7278'-7283' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 TBG to 11239' MD. Packers & SSSV (type & measured depth) 7" x 3-1/2" S-3 Baker Packer @ 11201' ' ~' ~- ' 13. Stimulation or cement squeeze summary ,~,,,, . ~,- ~ ,,,,,,, % '~ Intervals treated (measured) (see attached) ., Treatment description including volumes used and final pressure 14. Representative Daily Avera.qe Production or Injection Data OJl-Bbl Gas-Mcf Water-Bbl Casinq Pressure Tubing Pressure Prior to well operation 01/09/2002 944 2146 Subsequent to operation 01/15/2002 Well Shut-in 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __ Gas __ Suspended __ Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. D W,~, ~,,~2.~'.~v~~~,// Title: Tec~icalAssistant Date January16,2002 e ayne R Schnorr ~ Prepared by DeWa)/ne R Schnorr 564-5174 SUBMIT IN DUPLICATE MPC-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/10/2002 SWAP WELL FROM WATER TO GAS INJECTION. EVENT SUMMARY 01/10/02 WELL SUPPORT RIGGED UP AND SWAPPED BLINDS AND TORQUE TO SPEC. HB&R RIGGED UP AND PUMPED 20 BBLS METHANOL DOWN TUBING. PUT ON MI INJECTION. FLUIDS PUMPED BBLS DISCRIPTION 20 METHANOL 20 TOTAL Page 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner DATE: November 18, 2000 THRU: Blair Wondzell, P. I. Supervisor FROM: Lou Grima:~ii, ~ ~. SUBJECT: Petroleum Inspector SVS tests BPX C-pad Milne Point Unit Kuparuk River Field Saturday, November 18, 2000; I witnessed the SVS tests on BPX C pad in the Milne Point of the Kuparuk River Field. This was the three-month test for this pad due to a 26% fail rate witnessed by Inspector Jeff Jones on 7/9/00. The wells did somewhat better this time although the fail rate of 13.6% was still above the 10% expectable limit. Again, the gas injectors gave us the most trouble with two SSV's leaking. One Oil producer also had a leaking SSV. The pilots all tripped within limits. Well C-03 had a slight gas leak on the Tubing spool adapter, Larry Niles (MPU OI advisor) will pursue this with the wellhead manufacturer as to proper repair and report back to me. The wellhouses were all very clean and it appears to be a high priority in the Milne facility. SUMMARY: I witnessed the SVS test on BPX C pad in the Milne Point Unit. 1 pad, 11 wells, 22 components, 3 failures. Wellhouse Inspections; 14 wellhouses, 1 failure (leaking T.S.A.) Attachments: SVS MPU C pad 11-18-00 LG.XLS cc: Niles/Shipley (MPU OI advisers) NON-CONFIDENTIAL SVS MPU C pad 11-18-00 LG.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Larry Niles AOGCC Rep: Lou Grimaldi Submitted By: Lou Grimaldi Field/Unit/Pad: K.R.F./M.P.U./C pad Separator psi' LPS 140 Date: 11/18/00 HPS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed gAS or CYCLE C-01 1811430 140 100 120 p p OIL C-02 1821940 C-03 1820500 140 ~100 105 p p OIL C-04 1821260 140 100 105 P 4 OIL C-05A 1842430 140 100 105 P P C-06 1842410, C-07 1850020 140 100 110 p p OIL C-08 1850140 C-09 1850360 140! 100 80 p p OIL C-13 1850670 'C-14 1850880 140 100 105 p p OIL C-15 1851030 C-17 1852630 C-20 1890150 C-21 1940800 C-22A 1951980 140 100 110 p p OIL C-23 1960160 C-25A 1960210 4000! 2000! 2000 P 4 WAG C-26 1952060 C-28 1960290 4000 2000 2000 p p WAG C-36 1980010 C-39 1972480 C-19i 1852960 4000 2000 2000 P 4 WAG Wells: 11 Components: 22 Failures: 3 Failure Rate: 13.6%[] 90 Remarks: C-03 has gas leak on Tubing Spool adapter, Develop plan for repair and report back. ~ ~/ga/ac} Paee 1 of 1 V0kltrl6.xls .... STATE OF ALASKA ALASk., ,.~IL AND GAS CONSERVATION C~MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Convert from Water to WAG 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1468' NSL, 2328' WEL, Sec. 10, T13N, R10E, UM At top of productive interval 3564' NSL, 983' WEL, Sec. 4, T13N, R10E, UM At effective depth 4041' NSL, 1259' WEL, Sec. 4, T13N, R10E, UM At total depth 3818' NSL, 1301' WEL, Sec. 4, T13N, R10E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KBE) KBE = 50' 7. Unit or Property Name Milne Point Unit 8. Well Number MPC-19 9. Permit Number / Approval No. 85-296 10. APl Number 50-029-'9-t-~4;~ 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12200' feet Plugs (measured) 7439' feet 12110' feet Junk (measured) 7396' feet Length Size Cemented M D TVD 80' 13 3/8" 100 cu ft cement 115' 115' 6888' 9 5/8" 1850 sx PF 'E' & 275 sx Class 'G' 6923' 4637' 12217' 7" 350 sx 'G'/180 sx PF 33'-12250' 33'-7485' Perforation depth: measured 11478'-11498', 11738'-11764', 11780'-11820', 11866'-11876' !: ~..~,~.~,~'~,,,t ~ ~--' iJ true vertical 7088'-7098',7216'-7228',7236'-7256',7278'-7283' Tubing (size, grade, and measured depth) 3 1/2" 9.3# L-80 to 11239' Packers and SSV (type and measured depth) Baker Model S-3 Packer HYD Set, Latched @ 11201' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water & Gas Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,,,Chip Alvord ~.~..~' ~ ........... Title Engi!~.eering...Sup.ervisor Date Prepared By Name/Number: Mary Youngers 564-5242 Form 10-404 Rev. 06/15/88 Submit In Duplic~ SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX ! ARCO Well Name: MPC-19i Rig Name: N-4ES AFE# 330086 Accept Date: 05/03/95 Spud Date: . Release Date: 05/12/95 MAY 04, 1995 RIG ACCEPTED @ 2000 5/3/95. SCOPE DOWN & LOWER DERRICK, MOVE F/L-11 TO C-19i LAY HERCULITE SPOT RIG RAISE & SCOPE UP DERRICK BERM ALL TANKS & DRESS HERCULITE AROUND TANK. HOOK UP HARD LINE TO TREE & SKILL TANK. TAKE ON 10.9# NABR/CL PULL BPV PUMP OPEN SSSV SITP 900 PSI SICP: 0 PSI. WEIGHT UP BRINE TO 11.2# START BULLHEAD BRINE DOWN TBG @ 2BPM W/1600 PSI. TROUBLESHOOT & FIX POWER FAILURE ON RIG. CONTINUE TO BULLHEAD 11.2# DOWN TBG FINAL RATE OF 3 BPM W/1600 PSI TOTAL VOLUME 150 BBLS INITIAL SITP 750 PSI BLED TO 0 IN 30 MIN 0 PSI ON ANNULUS SET TWC. BLOW DOWN LINES START ND 3.5" TREE. MAY 05, 1995 FINISH ND TREE PUMP SSSV. TEST BOPE TO 250/5000 PSI. ANNULAR TO 250/3000 PSI. WITNESSING WAIVED BY JERRY HERRING, AOGCC FIELD INSPECTOR D4 DRILL. DRAIN STACK RU LUBRICATOR PULL TWC RD LUBRICATOR TUBING ON SLIGHT VACUUM. RU LANDING JT CLOSE BAG SITP & CP 0 PSI. BOLDS USING F/PACKER W/5k OVER UP WT 90k TUBING PRESSURE 0 ANNULUS 350 PSI. CIRC 11.2# BRINE DOWN TBG TAKING DIESEL RETURNS TO KILL TANK START TAKING 10.2# RETURNS THRU CHOKE & GAS BUSTER TO PITS. WT LEVELED OUT @ 10.4# RAISE WT TO 10.6# MONITOR WELL. WELL FLOWING NO PRESSURE. RAISE WT TO 10.8# MONITOR WELL 30 MIN STABLE. LD HANGER POH LD 3.5" BTC TBG LD SSSV RECOVERED 123 SS BANDS CONTINUE LD TBG. MAY 06, 1995 FINISH POOH W/3.5" TBG LD PACKER SEAL ASSY SPILL DRILL OS-93 SEC. SET WR RD TBG TOOLS PREP TO PU DP MU FTA #1 RIH ON 3.5" DP FROM PIPE SHED STRAP & DRIFT DP. MAY O7, 1995 FINISH RIH W/FTA #1 TO 11320' CBU PU WT 138K SO WT 81K SPEAR FISH @ 11332' BLED JARS OFF WORKED UP IN STAGES TO 92K OVER WITH STRAIGHT PULL TO RELEASE PACKER. CBU THRU CHOKE & GAS BUSTER. CIRC OUT GAS MONITOR WELL - OK. POOH W/FISH, SLOW SWABBING LD FISH RECOVERED UPPER PACKER TO LOWER SEAL ASSY RECOVERED 1 CUTTER BAR, 1 LIB TOOL STRING, Z-5 LOCK OUT TOOL & 1 CUTTER BAR FROM LOWER GLM. STRAP & MU FTA #2 PU 10 ADDITIONAL 4.75" DC START RIH ON 3.5" DP. CUT 102' & SLIP 60' DRLG LINE FINISH RIH W/FTA #2 TO 11634' D1 DRILL: OS - 57SEC. CBU @ 4 BPM W/1100 PSI. MILL PACKER F/11642' TO 645' PACKER DROPPED. CBU THROUGH CHOKE & GAS BUSTER. Page 1 of 3 SUMMARY OF DALLY OPERATIONS MAY 08, 1995 FINISH CBU PUSH PACKER DOWN TO 11765' MONITOR WELL OK. POOH LD 10 DC BOOT BASKETS & MILL. MU FTA #3 RIH TO 11750' PU WT 146k SO WT 82k D1 DRILL OS-45SEC. CIRCDN @ 4BPMW/1100PSILATCH FISH @ 11764 PULL FREE W/10k OVER CBU H2S DRILL. POOH PKR DRAGGING 10k-25k LD FTA #3 & LOWER PKR ASSY STRAP & MU FTA #4 START RIH ON 3.5" DP. MAY 09, 1995 SLIP 42' DRLG LINE SERVICE RIG FINISH RIH REVERSE CIR FILL F/11794'-851' REVERSE CBU REVERSE CIRC FILL F/11851'-12025' WASH & REAM F/12025' - 12110' RU & REVERSE XANVIS SWEEP @ 3 BPM W/500 PSI PU WT 165k SO WT 80k START POOH PULLED TIGHT @ 11970' WORKED LOOSE. LD 1 JT PU KELLY ROTATE & RECIP F/12040' - 12100' CIRC 40 BBL XANVIS SWEEP @ 5.5 BPM W/1500 PSI RECOVERED SMALL AMOUNT OF FORMATION SAND. START POOH PULLED 50k OVER @ 11808' CIRC & WORKED FREE SAME THING @ 11691' POOH LD FTA #4 BOOT BASKET FULL OF 10# METAL JUNK. MU FTA #5 START RIH FIRE DRILL. MAY 10, 1995 SERVICE RIG FINISH RIH W/MILL & SCRAPER TAG WT FISH @ 12085' REVERSE 40 BBL XANVIS SWEEP @ 3.5 BPM W/640 PSI. POOH TO 11330' ABOVE PERFS. CUT 102' & SLIP 60' DRILLING LINE POOH ND FLOW NIPPLE. NU SHOOTING FLANGE. RU ATLAS W/LUBRICATOR. TEST LUB TO 1500 PSI - OK. PERF RUNS W/4" ALPHA JET GUNS 4 SPF 32 GM RDX, 5" EHD TIE IN TO GEARHART DIL/SFL/GR DATED 12/24/85. MAY 11, 1995 FINISH POOH W/RUN #5 10 MISFIRES. RIH W/6" GR/JB TO 11468' POOH JUNK BASKET CLEAN RD ATLAS. ND SHOOTING FLANGE NU RISER & FLOWLINE. MU BHA #6 RIH TO 11360' CIRC @ 4.5 BPM W/1000 PSI. LD DP SLIP 60' DRLG LINE FINISH LD DP & BHA D1 DRILL OS - 43 SEC. PULL WEAR RING RU FLOOR TO RUN 3.5" TBG. MU PACKER & TAIL PIPE ASSY START RIH ON 3.5", 9.3#, L-80 EUE 8RD MOD TBG. MAY 12, 1995 RUN 3.5" COMPLETION AS PER TUBING DETAIL. MU FMC HANGER & LANDING JT LAND HANGER RILDS LD LANDING JT. NU BOPE INSTALL 2 7/8" RAMS NU FMC ADAPTER FLANGE TEST TO 5000 PSI OK. NU TREE TEST TO 5000 PSI OK RU LUBRICATOR PULL TWC. REVERSE ANNULUS W/243 BBLS SOURCE H20 W/25 GAL/100 BBLS COREXIT 7726 FOLLOWED W/55 BBLS DIESEL. 3 BPM W/300 1100 PSI. BULLHEAD 18 BBLS 50% MEOH 50 % 10.8 BRINE DOWN TUBING @ 2BPM W/800 PSI. DROP PACKER SETTING ROD SET PACKER W/4500 PSI BLEED OFF PRESSURE & PUMP UP PRESSURE TRANDUCER FOR CHART. PRESSURE UP CHART NOT RESPONDING CHANGE OUT TRANSDUCER. Page 2 of 3 SUMMARY OF DALLY OPERATIONS MAY 13, 1995 TEST TUBING TO 4500 PSI F/30 MIN OK. LOST 100 PSI BLED TUBING TO 1500 PSI TEST ANNULUS TO 3500 PSI F/30 MIN OK. LOST 75 PSI. WITNESSING STATE MIT TEST WAIVED BY DOUG AMOS AOGCC FIELD INSPECTOR BLEED OFF. RU LUBRICATOR & SET BPV. SECURE WELLHEAD & CELLAR. RIG RELEASED @ 0900 HRS ON 05/12/95. Page 3 of 3 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 15 May 1995 Transmittal of Data ECC #: 6426.00 Sent by: PRIORITY MAIL Data: PFC/PERF Dear Sir/Madam, Reference: MPC-19 MILNE POINT NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 PFC/PERF FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and return to; Petrotechnlcal Data Center 8P EXploration (Alaska) Ino 9An0~h~at Benson Boulevard Date ~ Alaska Oil & Gas Cons. Commission A~lchora[Te STATE OF ALASKA AL,-,oKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing X Variance__ Perforate__ Other X Change status 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1468' NSL, 2329' WEL, SEC. 10, TIOE At top of productive interval 1520' SNL, 1050' WEL, SEC. 4, T13N, RIOE At effective depth At total depth 1094' SNL, 1275' WEL, SEC. 4, T13N, RIOE 5. Type of Well: Development Exploratory __ Stratigraphic __ Service x R£¢l iyr D NiAR ?- 5 1995 Gas Cons. Commission Anchora ~, 6. Datum elevation (DF or KB) KBE = 50' feet 7. Unit or Property name Mi/ne Point Unit 8. Well number MPC- 19 9. Permit number 85-296 10. APl number 50- 029-21504 11. Field/Pool Milne Point- Kuparuk Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12250 feet Plugs (measured) 7485 feet feet Junk (measured) feet Length Size Cemented Measured depth True vertical depth 80' 13-3/8" 100 cu ft Cement 115' 115' 6888' 9-5/8" 1850 sx PF "E" & 6923' 4637' 275 sx Class "G" 12217' 7" 350 sx "G"/180 sx PF 33'- 12250' 33'-7485' measured 11819'-11800', 11800'-11780', 11737'-11751', 11751'-11770'11602'-11598', 11578'-11561', 11557'-11553', 11498'-11478' true vertical 7255'-7236', 7215'-7222', 7222'-7232', 7150'-7147', 7137'-7129', 7127'-7125', 7098'-7088' Tubing (size, grade, and measured depth) 3-1/2", L-80 butt. tubing to11669' MD Packers and SSSV (type and measured depth) BOT 'HB' Packer @ 11341' MD, Camco TRDP-1A SSSV @ 1918' MD 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 6/1/95 16. If proposal was verbally approved Oil x Gas __ Name of appro~er Date approved Service 17. I hereby certify'jtha~Lthe fgregoing is tr~e and correct to the best of my knowledge. FOR COMMISSION USE ONLY 15. Status of well classification as: Suspended__ Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test__ Location clearance __ Mechanical Integrity Test ~ Subsequent form required 10-_.~/', ~ Original Signed By Approved by order of the Commission 0avid W. Johnston I Approval No. ,-,ua '-'ved Copy Form 10-403 Rev 06/15/88 19i RWO SUNDRY INFORM/,~._N Objective- The objective of this workover is to convert C-19i from water to WAG injection well with new 3-1/2" 9.2# L-80 EUE AB-Mod tubing and a 7" latch type packer. The existing straddle assembly will also be retrieved, to optimize the injection rate, during this RWO. The C pad WAG is critical for fulfilling future MPU gas disposal requirements and 5 mmcfd of gas injection capacity is needed from MP C-19i. Scope' , Pre- rig: Obtain a static pressure survey w/ Amerada gauges after ceasing injection. Chemical cut the straddle assembly @ 11,476'MD (+/-20' below MMG-2 GLM @ 11,456'MD) for fishing operation. Punch two 3/4" holes @ 11,307'MD (+/- 10' above BOT PBR @ 11,327') for well kill operation. Record SITP and SICP. Install BPV. Remove wellhouse and flowline for Nabors 4ES rig move. , MIRU Nabors 4ES workover rig. Perform well kill operation before ND tree and NU BOP. , Puli existing 3.5" 9.2# L-80 BTC tubing w/one GLM and seal assembly. Retrieve the straddle packers assembly. Clean out wellbore to PBTD. . Perform wireline conveyed perforations at Kuparuk sands, see attached perforating guide line for the proposed perforation interval. . RIH with 7" latch type packer on new 3-1/2" 9.2# L-80 AB-MOD tubing and standard 3-1/2" tailpipe. , Freeze protect the well before setting the tubing packer. ND BOP and NU tree. RDMO Nabors 4ES. Timing' Nabors 4ES will be making a pad to pad move from C-17i to C-19i on approximately 6/1/95. This workover should take approximately 15 days rig time. MIRU / Kill well/ND_NU 2.0 days Pull 3-1/2" old tubing and L/D same 2.0 days Fish Straddle assembly 6.5 days (Note: the fishing operation may encounter similar problem as MP C- 09 for retrieving the straddle packer--BOT "2-B" packer) Cleanout welibore Complete well w/3-1/2" new tubing Total- 2.0 days 2.5 days 15.0 days Gas Cons. Anch0m ~ DH, March 19, 1995, 12:36 PM Milne Point Unit C Pad WAG Conversion Wells C-15i, C-17i & C-19i Perforatine Guidelines Atlas - Use 4" Alpha Jet 4 spf guns, 90° phas#~g, 32 gram RDX charge, .5" EHD, 32" 7~P Well Perforation Intervals (MD) Feet of Perfs C-15i 7,226' - 7,240' 14' 7,410'- 7,430' 20' 7,442' - 7,470' 28' total 62' C-17i 10,855'- 10,870' 15' 11,040' - 11,058' 18' 11,073'- 11,108' 35' total 68' C-19i 11,478' - 11,498' 20' 11,738' - 11,764' 26' 11,780' - 11,820' 40' 11,866' - 11,876' 10' total 96' RECEIVED MAR 2 3 1995 Ai~ska Oil & Gas Cons. Commissio. Anchora , , WELL Nb. COMPLETION MILNE POINT C-19 SKETCH UNIT ..(I) APl No.: 50-029-21504 PERMIT No.: 89-296 COMPLETED: 12/28/85 LAST WORKOVER: N/A _NOTES: ALL MEASUREMENTS ARE FROM KDB OF NABORS RIG NO. 27E KDB - SL-- 52' KDB- GL = 55' FMC TUBING HANGER W/ 3 1/2' 'H' BPV PROFILE ~ 3 1/2', 9.2# L-80 BUTI'RESS TUBIN0 (2.992' I.D,, 2.867' DRIFT) 2. MAX. ANGLE = 61.5' O 'rD 3. K.O.P. = 500' 1918' CAMCO TRDP-IA-SSA-SSSV (2.812' ID) 4..SLANT HOLE: YES 5. MIN. ANGLE = NA 6. TREE TYPEi FMC 3 1/8' APl 5000J WITH 3 1/2' 8 RD. TREETOP CONNECTION. 7. MIN. RESTRICTION IS CAMCO 'D' NIPPLE (2.75' ID) 8. COMPLETION FLUID: 10.2 PPG NoCI-NaBr BRINE ,. RECEIVED MAR 2 ;5 1995 Ataska Oil & 6as Cons. Commission Anchora ,~ PERFORATIONS: 5' HOLLOW CARRIER RETRIEVABLE ON WIRELINE 12 SPF 120' PHASING RUN IN'i'~RVAL TVD ZON-~ 1 111819'-11.800' 7255'-7236' LK-2 .2 11.800'-11,780 .... 3 11,602'-11,598' 7150'-7147' L-9 11,578'-11,561' 7157'-7129' L-8 4 11.557'-11,553' 7127'-7125' L-7 11.498'-11,478' 7098'-7088' MK-1 (BASED ON DIL DATED 12-24-85) LK-2 R~'-PERFORA~'D.'9-30-89. 4 SPF 11,737'-11,751' 7215'-7222' !1,751'- 11,770' 7222'- 7232' CO'lOGO INC. ANCHORAGE DIVISION 11,327' BOT PBR, SEAL ASSEMBLY 11,341' BOT 'HB' PACKER (2.89" ID) 11,381' CAMCO 'W-I' SELECTIVE NIPPLE (2.812" ID) 11.417' CAMCO 1 I/2" 'MMG-2' GAS LIFT MANDREL 11.456' CAMCO 1 1/2" 'MMG-2' GAS UFT MANDREL 11.466' BLAST JOINTS (100' TOTAL LENGTH. 4.5' OD) ,. ,.... · 11,639' BOT 'GL' LOCATOR SEAL ASSEMBLY ,, . il.640' Bom '2-B' PERkIANENT PACKER & SEAL BORE EXT. (5.875" OD. 4.0' ID) MILl. OUT EXT. ' (4,408' ID) 11,663' CAMCO 'D' NIPPLE (2.750' ID) 11.669' TUBING TAIL 1 1/2' CAMCO RG-2 .CIRCULATION VALVE W/ RKP LtTCH (3-2-66) 11,831 PBTD (WiRELINE TAG) 12,200' 7" 26# L-60 BTRS (6.276" ID, 6.059' DRIFT) ' -, AFl'RovED B~;:' HDS ' DATE: 03~18)92 , 'l DE,.A. FTED BY: SJ,N C.AO FILE: WCOCl9 I -- MPU C-19i )roposed Completion · =.m ...,.,,... m..... ~ ~.~,.,.,....= . FMC TUbmg Hanger v,V 3-1/2' 13-3/8" 48# H-40 1103, MD] I k Tree: FMC 3-1/8', APl 5K Conductor Casing ,j, ,~ ~ w/3-1/2" 8rd treetop i ' i connection KDB-SL 52' Surface Casing ,i ~ il ! KOP @ 500' ~' Max Hole Angle: 61.5° 3-1/2" Threaded @ TD L-80 Tubing AB-MOD connections ' 9.3 ppf, 2.992" i.d. ~ Completion Fluid = x. xx ppg i I i .i I STIMULATION SUMMARY NONE Latch Type PacNer 111,275, MDI ~! ~ PERFORATION SUMMARY (i.d. · tbg i.d.) __ REF: LOG: DIL 1 2/24/85 Camco "D' N~pple 1,1.2.o. MOI[] [] SIZE SPF INTERVAL OPEN/SQZ'D (2.75' I.d.) Tubing Tall 5" 12 I 1,478' - l 1,498' open ~' WL Reentry ' i 120° (7,085' - 7,098') Guide . { 5" ~ 12 11,553'- !1,557 open ~ ~ --- 120° , (7,125'-7,I27') m _ 5" 12 : 11,561'- 11,578' open m.- 120° (7,129' -7,137') '-5 5" 12 11,598' - ! i.602' { open [ 120° (7,14T-7,150') i .... 5" 12 11,780' - 11,819' open -- -- 120° (7,236' - 7,255') LK-2 mpedorated 9130/89 at 4 ! 11,73T - 11,770' MD (7,215' - 7.232' TVD) ~CURRENTPBTD I 11,S31'MD.WLMI 7", 26#, L-80 Butt. Csg 112,200, MDI ~---~. , k ,, DATE REV. BY COMMENTS MILNE POINT UNIT 3/9/94 DKW COMPLETION DATE WELL C-19i APl NO' 50-029-21504 BP EXPLORATION (AK) III I I I I C£1V£D ~ 3 '{99b & Gas Cons. Commission Aach0r~ ' SCHLUMBERGER WELL SERVICES A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION HOUSTON, TEXAS 77251-2175 PLEASE REPLY TO SCHLUMBERGER WELL SERVICES JAN 0 5 1~J93 Pouch 340069 Prudhoe Bay, AK 99734-006(, Conoco, Inc. 3201 "C" Street, Suite 200 Anchorage, AK 99503 Attention: Linda Starr Gentlemen: Enclosed are 3 BLprints of the WFL, Run 1, 12/31/92 Company Conoco, Inc. Well Milne Point Unit C-19 Field Milne Point .County Additional prints are being sent to: 1 BL prints Conoco, Inc. 600 North Dairy Ashford Houston, TX 77079 Attn: George Lamb, OF 2018 PT North Slope State Alaska 1 BL .prints , 1 RF Sepia Chevron U.S.A. llll! South Wilcrest Houston, TX 77099 Attn: Larry Sydora 713/561-3674 1BL prints Conoco, Inc. 1000 South Pine Ponca City, OK 74603 Attn: Glenn Welch, 7391RW ~ts , I RF Sepia~-'~ ~Alast~a Oil & Gas Conservation~ Commission ~3OO1 Porcupine Drive ~Anchorage, AK 99501 ~~ Larry Grant_____~.~ [__BL ~rints , l RF Sepia OXY U.S.A., Inc. 6 Desta Drive; Suite 6002 Midland, TX 79705 Attn: John Carrol 915/685-5898 ~prints prints The film is returned to Conoco, Linda Starr We appreciate the privilege of serving you. Received Date: G~S cons. c0mm'~ss'~0t~ Very truly yo~,ka Oil & SCHLUMBERGER WELL SERVICES Raymond N. Dickes STATE OF ALASKA ALAS. I~-~ OIL AND GAS CONSERVATION COMMIS~,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend __ Operation shutdown Re-enter suspended well Alter casing __ Repair well Plugging __ Time extention __ Stimulate Change approved program Pull tubing X Variance __ Perforate X Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Conoco Inc. Development __ ~' KDB feet 3. Address Exploratory __ 7. Unit or Property name 3201 C Street, Suite 200 Anchorage, AK 99503 Stratigraphic __ Milne Point Unit se~ice x 4. Location of well at surface 8. Well number 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. C-19 At top of productive interval 9. Permit number 627' FSL, 984' FEL, Sec. 4, T13N, R10E, U.M. 85-296 At effective depth 10. APl number 50-029-21504 At total depth 11. Field/Pool 1135' FNL, 1326' FEL, Sec. 4, T13N, R10E, U.M. Kuparuk River Field 12. Present well condition summary Total depth: measured 12,250' feet Plugs (measured) true vertical 7463' feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 16" To Surface 115' 115' Surface 6748' 9-5/8" 275 SX Class G 6784' 4648' Intermediate 1850 SX Permf E Production 12,166' 7" 375 SX Class G 12,200' 7440' Liner Perforation Depth: measured 11478'-11498', 11553-11557', 11561-11578', 11598-11602', 11780-11819' true vertical 7088-7098', 7125-7127', 7129-7137', 7147-7150', 7255-7236' Tubing (size, grade, and measured depth) 3-1/2", L-80, 11,669' Packers and SSSV (type and measured depth) CAMCO TRDP-1A SCSSV @1918';BOT HB Pkr @11,341', 2B Pkr @11,640' -13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: January 1991 16. If proposal was verbally approved Oil __ Gas __ Suspended __ Name of approver~ Date approved Service Waterflood Injector 17. I hereby c .~rtify that the foregoing is true and correct to the best of my knowledge. Signed (,~I~ ~ J.H. Andrew Title Production Engineer Date 12/08/90 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witneSSplug integrity BOP Test Location clearance __ .~ Subsequent form required lO- Mechanical Integrity Test Approved Copy. r,t~~~ ORIGINAL SIGNED BY /~//~/~ Approved by or~er, o LONNIE C. SM~e/'~missioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE RPU C-19 Workover - Perforate to Access LK-! Injection Zone Procedure Summary 1. Monitor SITP to determine reservoir pressure. MIRU workover rig on well. Kill well with NaBr/NaC1 brine (density determined by SITP). ND tree, NU and test BOP's. . PU to release from Brown Oil Tools PBR assembly at 11,327'. Circulate hole full of kill weight fluid. POOH and LD 3-1/2" production tubing. e TIH with overshot/grapple BHA to Brown Oil Tools PBR above HB retrievable packer at 11,341'. Latch PBR stinger and release packer. POOH and LD PBR stinger, packer, and isolation tubing. PU packer milling/pulling BHA and TIH to Brown Oil Tools 2B permanent packer at 11,640'. Latch packer and mill slips. POOH with packer and tailpipe assembly. GIH with 5" perforating guns and perforate the LK-1 sand 11,741'-11,761' DIL. Perforate the L-7 lobe at 11,554'-11,558'. Reperforate the L-9 lobe at 11,598'-11,604' and the LK-2 zone 11,780'-11,784'. e TIH with full bore retrievable packer on drillpipe and set near 11,650' (below L-9 perforations). Circulate down source water and establish injection into LK-1 and LK-2 sands. Allow injection to stabilize. . RU electric line. GIH with production logs while injecting source water and confirm LK-1 is taking fluid at an acceptable rate. NOTE' Additional work will be required if measured injectivity is insufficient. 9. Kill well. Release retrievable packer and POOH. 10. PU permanent packer and 3-1/2" tailpipe with wireline nipple and re-entry guide. GIH on electric line and set packer at 11,630'. POOH with setting tool and RD electric line. 11. PU isolation assembly for MK/L-7/L-8/L-9 perforations consisting of production seals, 3-1/2" gas lift mandrels, and wireline nipple below retrievable packer/PBR assembly . TIH on 3-1/2" production tubing pinned to packer PBR. 12. Sting into permanent packer at 11,630'. Space out, land hanger. RU wireline and set tubi~ng~plug in nipple below packer. Set retrievable packer near 11~33~0~~. 13. ND BOP's. NU and test tree. 14. RU slickline. GIH and pull tubing plug and dummies from isolation mandrels. RD slickline. 15. Return well to waterflood injection service. AILNL POINT UNIT C-19 COAPLETED I<DB - SI_ · 52' KD8 - Gl. · 35' MX. Nt3LE · 61.5 a TD KOP · 500' FAC 3 !/8' APl 5888 TREE V/ 3 !/2' 8 RD TREETCP C06IqECT [ ON APl NO,. 50-029-21504 COttDLET ICI',I FLU l O · ! 0.2 FI~ NaC l/NaBn ON 12-28 -85 FAC TUBING HAIXlC~R V/ 3 1/2' 'H' B='V PROFILE /",IN CONSTRICT]ON · 2.75 CAt~O 'O' NIPPLE 1 ~ 3 1/2' 9.2~ L'80 BTRS. ( 2.992 lO I Jf918' CAACO ROP-IA SSA SSSV liD · 2.8121 '-- ! I. 327' EOT Pf~. SEAL ASSE. ABLY ~ 11.341 ' BOT 'PIg' HYCRALI_ [ C ~R. I lO · 2.891 ~ORAT IONS. 11 381' CAY'dSO 'V-l' S~I'ECTIVE N IFF~E ( ID · 2.8121 C~.A4~7' CAt~O 'iAY'~G-2· ID · 2.92 11. 456' ~ L'7' Il 4,88' BAST JOI~iS · . · gO ~H. 4.5 'l ~.ssl-I l.S¢' ~O ~ l~ AS~~Y W L~AT~ F 12B-F l~' ~VO L-g:' ' I ~J ~-~ 11,8~B' ~T '2B' ~ 11.598-11,8~2' ~O ! IL ! ! ~R. ~ ~ B~E ' 7 147-7 158' TVO i I~ I EXTE~IOi W/ AIn.T ~-2~ ' ) L,r I EXTE~I~ ?ACT~ STIaULATI~. ) i~ll 669' T~J~ TAIL ~/3~/8B LK-2 52.31~ LBS I 12.~8 ~TD m~ ~,3 16-2~ ISP ' -- . i t WI~LI~ 7/2/9BI ~'. ~=.'=~:z ~!2.28B' P' 26' L'BB BTRS: 0 SCHLUMBERGER WELL SERVICES 500 W. INTERNATIONAl- AIRPORT ROAD ANCHORAGE, A. LASKA 99518 COMPANY LOCATION ATTENTION · AK OIL & GAS CONSERVATION · 3001 PORCUPINE DR. · JOHN BOYLE COMMISSION X COMPUTING CENTER PRINT CENTER WELL NAME SERVICES · M'ILNE POINT.UNIT C-19 ., :.' 1 WF/PL ADVISOR. REpoRT · NO, OF, BoXES'· ALL IN ONE..Box' ., ... JOB .NO.. · ADD'L TAPES · 7.'3 9 5'2 ·. ... .. .. WELL NAME. .... SERVICES .. · · ~MILNE POINT UNIT C-10 ,; : · 1 WF/PL ADVISOR'REPORT · . .. N0. OF·BOXES: ...~T.,T,...IN ONE:' BOX .. JoB NO.. ' : . '.. · . ADD'L TAPES :. _- .. 7.~945 .. · . WELL NAME .... "' SERVICES ..' NO, ·OF BoxES: JOB NO, . · 'ADD~L ·TApEs·" .. .. SCHLUMBERGER COURIER:' ,. · ·WELL NAME SERVICES ,. .NO. OF .BOXES" .. JOB NO. . .. . .. · .. 'ADD'L TAPES .. · .. WELL. NAME · ' sERViC.E.S N°. OF BOXES: .. . . . . . . . JOB NO.' · ... ADD'L TApEs... · WELL NAME · SERVIC'ES -. ..' N.C. OF BOXES' ~ ' JOB NO'. ' .,! .~. DATE· DELiYERE.D: !.": ,,. · . 1: .ADD'~[ TAPES .'. · . ... .. . .. FROM .~' ~/..,/ _'~ ADDRESS CITY ,~, STATE SHIPPER TO CITY STATE ZIP I DATE ~'1,¢~/',/. I TIMi' ZIP A3-rENTION-~- ,-/i t-, ,/-~',~'{-' ,J INSTRUCTIONS PHONE I~. 24 HOUR SAME DAY [] P/U BY 3PM , . [] ONE HOUR CASE NO. COURT DOCUMENTS ONE HOUR $ SAME DAY $ 24 HOUR $ .' OTHER $ TOTAL $ Xl RECEIVED BY DATE I I" TIME ,I SCHLUMBERGER WELL SER¥1CE$ ~CHL~BERGE~ WELL JUL I 2 1990 Pouch 340069 Prudhoe Bay, AK 9973~-0069 Attn: BeTnl e/Shelley CONOCO, Inc. 3201 "C" Street, Suite 200 Anchorage, AK 99503 Attention Mar c~hannon C~entlemen Injectivity Profile Log, Run 1, 7/2/90, [~¢[o~ed ore_2__B_L_prints o{ the. Injected Water Flow Log, Run 1, 7/6~'90 Company CONOCO, Inc. Well Milne Point Unit C-19 On F~eld Milne Point Add;t~or~o[ prints ore be,ng sent to 1 BL prints C01~OCO, Inc. 600 North Dairy Ashford Houston, TX 77079 At,n: George Laab - OF 2018 PER Count Store Alaska __l_JLL_prints, 1 RF Sepia Cf)~ft~ I nc . 1000 South Pine Ponca CJ ty, OK 74603 Al: t n: Log L.J_J b~_~rY 1 BL 9rints, 1RF Sepia OXY U.S.A., Inc. _!6_De~_I_~ Drive Midland, TX 79710 At t._n_i.' John Carrol *(91ff685-5600) 1BJ~_~rints, 1RF Sepia _f~b_evron U.S.A. _D~_0_L_B_ollin. ger Canyon Road _~n R~mon, CA 94583-09~3 A~n: ~isc~cLeroy ~ (4157~00) ~ _Alaska Oil a Gas Conservation Co~:ss~on ~ 3001_~orcupine Drive ~ ~;:ate, ~K 99501 / The film is returned to Conoco_._ Log L~brary. We oppreciote the privilege of serving you. prints prints ____prints _J{ecei red by: D a t e: ,_~~ Ve~ truly yours ....... A~(~,~ SCHLUMBERGER WELL SERVICES ~,~- t 3274' David M. ~aalw~_e_c}~X_e_:___ -STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C~IMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 (907) 279-1433 TO: Receipt of the following material which is transmitted via hereby acknowledged: QUANTITY DESCRIPTION Copy sent to sender YES NO ~/ -- · ~ I~,1 I- L~P ~l._~bl~ /u-4SKA OIL AND GAS CONSERVATION COM~qSION ~' , REPO, OF SUNDRY WELL OF ., TION 1. Operations performed: Operatfon shutdown__ Pull tubing ~ Alter casinc~ ~ Repair well __ 2. Name of Operator I 5. Type of Well: CONOCO INC. I Development__ Exploratory __ 3. Address ! Stratigraphic __ 3201 C RT.; .~T_F: 200, ANCHORAGE, AK 995__r~ Service'X- 4. Location of well at surface Stimulate --Z- PluggIng __ Perforate _~ Other 1468' FSL, 2329' FEL, Sec. 10, T]3N, RIOE, U.H. At top of producbve interval 546' FNL, 1000' FEL, Sec. 4, T13N, RIOE, U.M. At effective depth At total depth 1,1,35' FNL, 1,326' FEL, Sec. 4, T1,3N, R1,0E, U.H. 12. Present well condition summary Tolal depth: measured 1' 2,250 true radical7469 Effective depth: measured true vedical 13, feet feet feet feet Plugs (measured) Junk (measured) Casing Length Size Structural Conductor 80' 13 3/8 Surface 6784' 9 5/8 Intermediate Production ] 2,215 ' 7 Liner Perforation depth: measured11,780' - ! 1,819 '; 11,478'-11,498' true verticaF 236 ' -7255'; Cemented 6. Datum elevation (DF or KB) 52 KDB 7. Unit or Property name Mi ! ne-~qoint Un! t 8. Well number 9. Permit number/approval number 10. AP~ ~ur~er 50-- ll2q-?l ~04 1i. Field/Pool Kuparuk River PBTD-11,831 True vedical depth Measured depth IOOCF 115' 115' 705 bbls 6784' 4655' 717 bbls 1,2,215' 7424' 11,598'-11,602'; 7147'-7150'; feet 11,561'-11,578'~ 11,533'-11,557' 7129'-7137'~ 7125'-7127'; 7088'-7098' Tubing (size, grade, and measured depth) 3 1/2" L-80 9 2# , ! · , BTRC e 11,669' 11,327, Bottom Pkr-BOT '2B' e 11,640'; SSS Packers and SSSV (type and measured depth) Top Pkr- B0T ' HB ' Camc~ TRDP-1A e ,1918' Stimutalion or cement squeeze summary Frac Lower Kuparuk press· 1958 psi Intervals trealed (measured) ! ], 780 ' - ] ], 81_ 9 ' Tubing Pressure Treatment description including volumes used and final pressure 53,300 proppant, fi na I Subsequent to 15. A~achments Cop~es of Logs and Surv~ run Daily Repod of Well Operations Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Waler-Bbl Casing Pressur,e 1677 2409 1830 0 2514 16. Stalus of well classdication as: Service Date/O L~ D ',,~ SUBMIT IN DUPLICAIE Oil ~ Gas __ Suspended 17. I hereby certify that lhe fo. regoing is true and correct to the best of my knowledge. Signe Title $,. ~ I V m~l~O, I i ¢ DATE 9/30/89 WELL C-19 PERFORATE 1830 MIRU HLS E-LINE UNIT, RIH W/ GR/CCL TO 11,821'. LOGUP TO ii,400', TIE IN W/ DIL DATED 12-24-85. POOH. 2400 RIH W/ 2.125 DYNA STRIP PERF. GUN & CCL LOADED W/ 4SPF W/ 20.5 GM CHARGES. TIE IN W/ CCL AND GR. SHOOT i9' F/ 11,770~- 11,751~, POOH, 100% SHOT. RIH W/ SAME AND SHOOT 15' F/ 11,751'- ii,736', POOH, 100% SHOT. R/D MO. DATE 9/50/89 FRAC JOB 1200 RU DS, MIX LINEAR GEL IN i FRAC TANK, RU HOT OIL ON ANNULUS. RU TREATING LINE AND RU TREE SAVER. PRESS UP ANNULUS TO 2000 PSI. TEST LINES TO 7000 PSI 1526 PUMP 119 BBLS OF PRE PAD AT 25 BPM AVG. 5600 PSIG. PUMP 357 BBLS OF PAD OF CROSS LINKED GEL W/ 5% DIESEL AT 25 BPM. PUMP 131 BBL OF 4 PPA SAND STAGE AT 25 BPM, START FLUSH 25 BPM 1600 FINAL PRESS 1958. TOTAL PROPPANT USED WAS 53,303 #'S DATE 10/i9/89 CLEAN OUT, COIL TUBING 0900 RU FRACMASTER COILED TBG. PRESS TEST TO 4000 PSIG. OK. RIH W/ 2.5°. OD JETTED BULLL NOSE ON 1 1/2" C.T. TO TAG FILL AT 11~425 CTM. JET DOWN THROUGH 40~ OF FILL THEN PU. CONTINUE REVESE CIRCULATING OUT FILL DOWN TO 11,819'. POOH PUMPING 1/2 BBL/MIN FOR 30 MIN. THEN S/I PUMP. ONCE ON SURFACE, BULLHEAD 7 BBLS OF BRINE DOWN 3 1/2 TBG. CLOSE SWAB AND CIRCULATE OUT COIL W/ DIESEL. 0300 RIG DOWN COIL UNIT AND PUMP TRUCK. PUMP 10 BBL METHANOL DOWN THE TUBING FROM MOD 26. STATE OF ALASKA '--' 0 R ALASKA OIL AN D GAS CONSERVATION COM M IboION APPLICATION FOR SUNDRY APPROVALS 16 IN 1. Type of Request: Abandon __ Suspend __ Alter camng __ Repmr well __ Change approved program __ Operabon shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Sbmulate x__ Pull tubing __ Vanance __ Perforate x__ Other __ 2. Name of Operator Cortoco Tnc. 3. Address Box 340045, Prudhoe Bay, AK 99734 4. Location of well at surface 1468' FSL, 2329' FEL, Section 10, T13N, At top of productive interval 546' FNL, 1000' FEL, section 4, T13N, At effective depth At total depth 1135' FNL, 1326' FEL, Section 4, T13N, 12. Present well condition summary 5. Type of Well. Development Exploratory Stratigraph~c Serwce R10E, UM R10E, UM R10E, UM Plugs (measured) PBTD 6. Datum elevation (DF or KB) 52 KDB, Pad 17' feet 7. Unit or Property name Milne Point Unit 8. Well number C-19 9. Permit number 10. APl number 50--029-21504 11. F~eld/Pool Kuparu_k R_iv_e Total depth: measured 12,250 ' feet Effective depth: Casing Structural Conductor Sudace Intermediate Production Liner Perforation depth: true vertical measured true vertical Length 7,469' feet feet feet measured true vertical Junk (measured) Size Cemented Measured depth s ,o281989 Alaska 0it & Gas Cons. Commis Anchorage True vertical depth 80' 13-3/8" 100 cf 115' 115' 6,784' 9-5/8" 705 bbls 6,784' 4,655' 12,215' 7" 71.7 bbls 12,215' 7,424' 11,780'-11,819', 11,598'-11,602', 11,561'-11,578', 11,553'-11557', 11,478'-11,498' 7,236'-7,255', 7,147'-7,150', 7,129'-7,137', 7,125'-7,127', 7,088'-7,098' ~bing(size, grade, and measureddepth) 3-1/2" L-80, 9.2# BTRC @ 11,669' Pac~rsandSSSV~ypeandmeasureddepth) Top pkr - BOT 'HB' @ 11,327', Bottom pkr 11,640', SSSV - Camco TRDP - IA @ 1918' - BOT '2B' @ 13. Attachments Description summary of proposal __ Detailed operations program __ BOP sketch __ 14. Estimated date for commencing operation October 2, 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas __ Suspended __ Service Water In-] ection 17. I hereby certify tl~the foregoing is true and correct to the best of m~_.~owledge. Signed Title ~'~. FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- Approved by order of the Commission ORIGINAL SIGNED BY LONNIE C. SMITH Commissioner Date ~'/~/~:~ JApproval No. Approvef- ~j~ ¢Copy Returned Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE SIIMULATION PROCEDURE Hydraulically Fracture MPU Wel Milne Point Unit Surface Location: 1468' FSL, 2329' FEL, Sec. 10, T13N, RiOE, UM Depths: All depths are measured from KB datum. Casing: Surface - 9 5/8", 36#/ft, K-55, btrs., set at 6,784'. Production- 7", 26#/ft, L-80, btrs., set at 12,200~. Capacity: 3.82 bbl/]O0' Burst Pressure: 7,240 psig Tubinq: 3 1/2", g.20#/ft, L-80, btrs ~ 11,669' Capacity: 0.8700 bbl/lO0' Capacity of tubing/casing annulus: 2.64 bbl/lO0' Burst Pressure: 10,160 psig {no safety factor} Rat Hole Volume: 6 bbl. Present Completion: Single selective. Lower Kuparuk (2) 11,780-11,819 with the LZ and Mk completed as the selective intervals {See the attached wellbore diagram for perforated intervals). Present Status: Injection Well pending initiation of injection. Objective: 1) Fracture stimulate the LK-2 to maximize the rate of water injection. 2) Perforate the LK-1 to increase the rate of water injection and improve waterflood sweep efficiency. Recommended Procedure: 1) Hold a pre-frac meeting with all contractors to discuss job requirements and safety prior to the job. 2) The well contains a Camco TRDP-1A SCSSV. Maintain sufficient control line pressure to keep the valve open throughout the job. CLP: (tubing fluid gradient-control line fluid gradient) *safety valve depth+2200+400+tubing pressure. 3) Isolate the selective interval (11,341'-11,640') by installing dummy valves in the mandrels located at 11,417' and 11,456'. Run in the hole with tubing plug and set in the "D" nipple at 11,663'. Pressure test tubing to 6,000 psig (9,140 psig BHP which allows a 10% safety factor on the tubing). Re- trieve the tubing plug. If tubing does not test, contact the Anchorage office before proceeding. RECEIVED Distribution' TRP, JDC, PJG(2), MPU Senior Foremen SF-P28J989 ?Jaska OJJ & Gas Cons. Commis$)c: Anchorage Frac'ture MPU Well C- March !, !989 Page 2 4) Spot two 500 bbl frac tanks on location approxiDm,,ately 150' from the wellhead. Elevate the rear of the tanks approximately . Visually inspect the in- terior of the tanks for cleanliness (do not climb into the tanks). Fill each tank with 425 bbls. of clean MPU injection water. The water should be heated and maintained at 75-80 degrees F in order to insure proper hydration of the gelling agent. 5) Rig up tree saver and service company pump lines (use no threaded cross- overs, swedges or valves). Install two shut-off valves on the wellhead. Use two in-line densiometers. Set up backup pumps for crosslinker and diesel. Rig up annulus pump to maintain 2,000 psig backside pressure., 6) Batch mix 850 bbl. (35,703 gal.) gelling agent at 40 lbs/lO00 gal containing 2% KCL, 500 ppm biocide and 5 gal anti-foamer per tank. Crosslinker, breaker, 5% diesel and a particulate fluid loss material will be added on the fly as outlined in the pumping schedule. 7) Fill out the fluid report forms. Check all additives against the attached material detail. Continuously roll the tanks until the viscosity is within the recommended limits ( 45 to 55 at 300 rpm on Fan 35 viscometer). Check samples from the top and bottom of the tank, values should correspond within 3 cps. 8) Hold a safety meeting with all personal on location. 9) Pressure test the surface lines and tree saver to 6,000 psig. Check the lines to insure that there are no leaks. Pressure up the annulus to 2,000 psig and maintain througho_ut:t_he job. 10) Prepare to pump the frac job a's follows: A) Standby pumps (50%) are required. These pumps must be manned and primed to immediately come on line if needed. A standby blender must be hooked up and ready to come on line in the case of primary blender failure. Pump the first 2,500 gal of pre-pad on standby blender. Switch to main blender for the remainder of the job. B) Tank bottoms are included in the volumes listed in step 5. Leave 50 bbls tank bottom. C} Use the in-line densiometers during the job. Record pressure and rate on a strip chart. Send the charts to the Anchorage office. D) Take samples of the crosslinked gel during the job. Place them in a water bath at 165 deg. F. Observe the samples and note when the gel breaks. E) Pre-Pad and flush fluid is not crosslinked and does not contain diesel ECEIV D F) DO NOT OVER DISPLACE. SF_P28]9(]9 Alaska Oil & Gas Cons. Commissio Fracture MPU Well February 24, 1989 Page 3 Frac Rate: 25 BPM Maximum Allowable Surface Pressure: 6,000 psig 0 25 BPM Anticipated Surface Pressure: 4,500 psi§ to 5,000 psi§ Gel Diesel Cum Sand Cum Fluid Pump Time S t__t~gg {gal_) (gal) ppg lbs. (lbs.) (_qal .) Minutes P-Pad 5,000 5,000 4.8 Pad 14,250 750 20,000 19.0 ] 4,545 240 4.0 19,134 19,134 25,500 24'.3 2 3,290 173 8.0 27,702 46,836 30,000 28.6 Flush 4,418 34,414 32.8 Totals 31,503 1,163 46,836 46,836 34,414 32.8 Cum fluid=gel+diesel+sand Pre-Pad and Pad should contain 50///lO00gal. fluid loss additive. 11) Shut down. Allow the pressure to bleed off into the formation. Record the ISIP, 5 minute, 10 minute and 15 minute pressures. Close all surface valves and leave the well shut-in over night. Leave the SCSSV open. Have the service company monitor the break time of the last sample collected. 12) Rig down service company. 13) Rig up slickline with sinker bar. Run in the hole and tag fill. If fill is present above 11,819 (bottom perf), rig up coil tubing and clean out to below this interval. Rig down coil tubing. Engineering will provide coil tubing procedure, if necessary. 14) Rig up the perforating company. Run a GR/CCL and correlate to the attached GR/DIL (dated 12/24/85). Perforate the intervals shown below with 4 SPF using a 2 1/8"retrievable through tubing gun. Perforate at 0 degree phasing with the gun positioned against the casing. Rig down the perforators. PERFORATION DETAIL PERF INTERVAL FEET SPF~ TOTAL SHOTS CHARGE EHD ECP ]1,736'-11,770~ 34 4 ]36 6.5 gm 0.32" ]2.84" The above values of EHD and ECP were determined using API RP-43 specs, and are considered to be the minimum exceptable values for penetration and diameter. Depths are based on the attached GR/DIL dated 12/24/85. 15) Run in the hole with slickline and pull dummy valves from the selective interval. Return the well to injection at the highest maximum surface pressure of 3,200 psig. Alasb Oii& Gas Cor~s. Fracture'MPU Well --'9 February 24, 1989 Page 4 MATERIAL DETAIL Clean MPU injection water KCL (2%) Gelling Agent (40#/lO00gal Hydroxypropylguar) Crosslinker (3#/IO00gal) Anti-Foamer (Sgal/tank) Bi oci de (500 ppm) OAP (50t//lO00gal Pad and Pre-Pad only) Breaker Diesel ]6-20 Intermediate Strength Prop 35,703 gal. 6,070 lbs. 1,428 lbs. 66 1 bs. 10 gal. 18 gal. 1,000 lbs. As recommended by service company. 1,163 gal. 46,836 lbs. Note: Diesel and prop should not be included in service company bid. Service company should be prepared to supply either Adomite Aqua or OAP fluid loss additive at Conoco's discretion. TREATMENT HYDRAULICS Maximum Rate: 25 BPM Average Anticipated Pressure: 5,000 psig Estimated Hydraulic Horsepower: 3,064 hhp (An additional 50% hp capacity is required on location) Backside pump capable of maintaining 2,000 psig static surface pressure is required. The following backup equipment is Pequired:' 1) 50% backup on primary injection pumps. 2) 100% blender backup. 3) 100% backup on diesel and crosslinking pumps. Prepared by: Steve Rossberg Production Engineer Approved by: ~/_~m~~ Superj~ising Production Engineer Field Superintendent R£CEiVE!) 1 1o A)I moeeufemerite lira Illin KD8 8. KDB- GL $1'. 8. KO, ,~' ~ . 7. Min. angle I..F~ ~ 1/1' XPI lOGO+ tree with O 11~' 8 Id, treetop oonnootlon, Min. roltrlollon Il CAMCO JO. APl No, 50.- 029 - 21504 i i 11. Completion f~d 10.2 ppg NoCl/Nob O8olno sfld cement ~formetloa tuppled on 4sslflg end oomoflt '! S' hollow carrier fetrllvoble on 12 SPF 12~ KoIIti RUN INTIRVA~ TVO , . MILNE POINT UNIT C-19--- ACTUAL COMPLETION SKETCH COMPLETED ON" 12-28-85. :_'! . , FMC TUBING HANGER w/ LK-~' {k/Ca _ . Ollellll, l''l- Il L-9 L-I MK-I , -- 3 ~'t" 9.2 lb/fl L-80 8TRt (t.992," ID, '2. il?" drift) . , toll' CAMCO TRDP- IA SSA SSSv (~.el~"lo), . 34 I' lOT ' NB' Hydroullc Pecker ( 2.890" I0 TII,381' ~'AMCO W*l Solocflvo Nixie (2.81:' ID) · 11,417' CAMCO I°/t" kMO-8 Mo~dfol (2.92" ID) --11,466' -- 11,619' BOT *CL' Locolor Seal 11,640' BeT '28' PirmoneM Pecker 6 Soil Boll ~tl. 15 875" OO~ 11,66~'CAMCO 'D' NIpple (2.75' 10) !1,669'Tubi~ Toll FISH, I~1" CAMCO RG-~ Clrculoflon Volvo w/ ~KP ~lch (3' 2' 86) 11,831' PBTD {Wlfellfll tag) j , , ~' ~" 26~ L'80 8TRS 16 276" ~, e.O~9' drtfl} MILNE POINT C-19 OPERATOR: CONOCO INC. SURFACE LOCATION: 1468' FSL, 2329' FEL, Section 10, TI3N, RIOE, U.M. BOTTOM HOLE LOCATION: 1135' YNL, 1326' FEL, Section 4, T13N, RIOE U.M. SPUD DATE: 12/09/85 PBTD @ 11,831~ JRH 02104186 13 3/8" 48f, H-40 Pelp at ~' 9 5/8" 36~, K-55 Btre at 6784' TOC unknown ECP 11,681' · ECP 11,742' 7II 26~, L-80 Btrs. at 12,2~'~{ NOTES: 1. All measurements from KDB of Nabors 27-E 2. KDB - SL - 52' 3. KDB - GL - 35' 4. Max. angle - 61.5' at TD 5. KOP at 500' 6. Slant Type Bole - YES 9 5/8" Surface Casin~ 1. Pumped 60 Bbla of Sepiolite spacer. 2. Pumped 649 Bbls (1850 ax) of Permafrost "E" cement with 5 lb/ax Gilsonite, 3. Pumped 56.3 Bbls (275 ax) of Class "O" cement with 31 NaC1 and 1% CFR-2 4. Displaced with 516 Bbls 9.7 ppg mud. NOTE: Full returns with 200 cement to surface. Centralizers: I per 40' 6770' - 6270' I pe~ 80' 6270' - 500' I per 120' 500' - Surface 7" Production Casini 1,. Pumped 40 Bbls of 12 ppg Sepiolite spacer. 2. Pumped 71.7 Bbls (375 ax) Class "G" cement with 1~ CFR-2 and Halad-2&. 3, Displaced with 463 Bbls of 10,2 ppg NaC1-NaBr brine. NOTE: Loss circulation, Centralizers: I per 40' 12,200' - 10,700' I per 80' 3,000 - 500' I per 120' 500' - Surface 7" x 9 5/8" Annulus 1, Waste disposal permit expires 02/15/86. Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 December 23, 1987 Ms. Fran Jones Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Ms. Jones: Enclosed please find the drilling "well histories" from Conoco's Milne Point unit ~;Weils No. C-17, C-19, B-20, B-21 and B-22. If you require additional information concerning this well history, please contact Mike Zotzky at 564-7623. Yours very truly, E. D. Wilson Sr. Administrative Coordinator ¥¥ C-17, C19, B-20, B-21, B-22 oas CONS. a "~TCitor~g0 °ratnl~lott Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Point C No. 19 - CONFIDENTIAL (1135'-Kuparuk River) AFE 10-61-1150 AP1 No. 50-029-21504. Ak. Permit No. 85-296. Elevation: 59' KB. Location: 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. 12-10-85: Strap & PU BHA, steam motor, change battery & valve in MWD, orient MWD. Function test diverter. Drlg from 103' to 1440'. 12-11: Drlg from 1440' to 1624', loss of pump press. POOH from 1624', LD Navidrill. Found bad dump valve. PU 9 1/2" Navidrill, PU stabilizers, orient MWD. Slip & cut drill line. RIH to 1594', wash & ream to 1624'. Drlg from 1624' to 2086'. Motor weak, pump slug. POOH from 2086'. LD 9 1/2" Navidrill. Found lower seals washed out, PU jetting assby. Orient same & RIH. RIH to 2086'. Jetting & drlg from 2086' to 2447'. 12-12: Jetting and drlg from 2447' to 2877'. Circ, pump pill, POOH, LD jetting assby. PU 8" navigational motor. RIH. Navi-drill and drilled from 2877' to 4050'. 12-13: Drld and Navi-drld from 4050' to 6050'. 12-14: Drld from 6050' to 6117'. POOH to 1632' (hole tight 3040' to 2740'). RIH to 2740'. Work tight hole 2740' to 3040'. Ream 2710'-50' & 2900'-50'. RIH from 3040' to 6117'. Drld from 6117' to 6775'. POOH from 6775' to 500'. RIH. 12-15: RIH to 6775'. Circ & cond hole. POOH from 6775' to surface, laying down MWD and Navidrill. RU Gearhart, RIH w/EDC-CNL-GR-Cal-DIL to 6786', logged 6786' to surface. RD Gearhart. RIH to 6600'. Work tight hole, RIH to 6775'. Drld from 6775' to 6800'. circ and cond hole. POOH to 6500', tight, work tight hole, ream 6583' to 6650'. RIH to 6800'. Circ and cond hole. POOH. 12-16: Finished POOH and laying down BHA. RU and ran 169 jts of 9 5/8" 36# K-55 csg. RU cmting head, circ csg volume, pumped 60 bbls of 11 ppg Sepiolite spacer, and 40 bbls water spacer. Dropped bottom plug, cmt'd w/1850 sks Permafrost E and 275 sks Class G w/3% NaCI & 10% CFR-2 @ 5-8 BPM. Displaced cmt w/9.7 ppg mud @ 9 1/2-7 BPM w/full returns. Bumped top plug to 2000#, checked floats (OK), circ 200 bbls cmt. ND diverter system, NU speed head, NU BOP's. 12-17: Change rams & NU flowline, RU test BOP. Tested BOP & choke manifold to 5000#. Annular to 3500#, install wear ring & pull stripper over the hole, witnessed by Ed Sipple w/AOGCC. PU BHA, test motor & MWD, orient MWD. RIH to 6700'. Fill DP, circ, test csg to 1500 psi for 1/2 hr, OK. Clean out cmt to 6800'. Drld to 6823'. Ran 12 ppg leak off test. Drld from 6823' to 7330'. 12-18: Drld from 7330' to 7586'. POOH, bit balled up & had two plugged jets. RIH, cut & slip drlg line. RIH to 7586'. Drld from 7586' to 8880'. 12-19: Drld from 8880' to 9743'. Short trip from 9743' to 6780'. RIH. Drld from 9743' to 10660'. 12-20: Drld from 10650' to 11530'. 12-21: Drld from 11530' to 11587'. 11587' to 12190'. Short trip 50 stds from 11587' to 6780'. Drld from 1 Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Point C No. 19 - CONFIDENTIAL (1135'-Kuparuk River) AFE 10-61-1150 API No. 50-029-21504. Ak. Permit No. 85-296. Elevation: 59' KB. Location: 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. (cont'd.) 12-22: Drld from 12190' to 12250'. POOH from 12250' to 6780'. Trip in hole to 12250', hole tight 12250' to 11750'. Circ & cond hole. POOH from 12250'. Repair rig. Finished POOH. RU Gearhart, RIH w/GR, FDC, CNL, DIL to 7778'. Tool stopped, worked tool up and down, couldn't get below 7735'. PU to 7485'. Tool stuck, cannot get free. Pulling 4000# over line weight. 12-23: Work stuck wireline tools pulling up to 4000# over line weight, weak point 4500#. RU fishing tools, cut wireline, RIH threading and stripping over W.L. to 7407', top fish 7435'. Thaw out mudline, circ DP. Work over fish w/overshot, took 15000# to push fish free. Pull W.L. out of rope socket, then out of hole. POOH w/fish, lay down logging tools. RD Gearhart. RIH w/bit to 1548'. Cut 104' Drlg line. RIH to 6800', fill DP & break circ. RIH to 10600', hit tight spot. 12-24: RIH to 12250'. Circ and cond mud, unpack stabilizers, work tight hole 12180' to 12250'. POOH for logs. PU and RIH w/logging tools on DP. RIH to 9992'. Make up side door entry sub, RIH w/W.L, to 9500'. Circ DP, latch up W.L. to logging tools. RIH to 12250'. POOH from 12250' to 11413', pump pill. POOH, logging. 12-25: POOH from 11413' to 1000', logging GR-SP-DIL-FDC-CNL. RD WL and side entry sub POOH w/logging tools. LD logging tools. RIH w/bit & DP. Circ and con mud, pump pill. POOH, LD DP and BHA. RU to run csg. 12-26: Break Kelly, pull wear ring, change rams, PU csg tongs and running tools. Run 312 its and 7" 26# L-80 btrs csg shoe @ 12215'. FC @ 12127'. Returns decreased from full to zero last 20 jts. Pumped capacity of csg with small to full to zero returns. Pumped 40 bbls 12 ppg Sepiolite spacer. Cmt'd. w/275 sks Class G w/l% CFR-2 & 0.3% Halad -24, dis- placed w/463 bbls 10.2 ppg brine. Treated csg to 3000# for 30 min, OK. RD csg crew, RU to log, orient Gyro. RIH w/CCL, GR & Gyro. 12-27: Complete G.R., CCL & run Gyro. Tagged bottom @ 12052'. RD logging tools, PU lubri- cator. PU 5" 12 SPF perf gun loaded for 19'. RIH tie in & perf from 11819' to 11800'. No change in fluid level. POOH. RIH w/5" 12 SPF gun loaded for 20' tie in & perf from 11800' to 11780'. No change in fluid level. POOH RIH w/5" 12 SPF gun - Select Fire from 11602' to 11598' & from 11578' to 11561'. No change in fluid level. POOH RIH w/5" 12 SPF gun- Select Fire from 11557' to 11553' & from 11498' to 11478'. No change in fluid level. POOH. RD perf gun & logging tools. Run gage ring & junk basket, tag bottom @ 11831', POOH w/gage ring. RD junk basket, PU 2B packer w/setting tool. RIH & set packer @ 11640'. POOH w/setting tool. Bottom of shear sub @ 11669', D-Nipple @ 11663'. Chg to 3 1/2" rams. RU to run tbg. PU blast joints (4 1/4" O.D.) GLM(s). W.L. nipple & HB PKR. Begin RIH w/9.3 lb/ft L-80 8RND EUE. Kuparuk River Field North Slope Borough, Alaska W.I. - 50.58467% Milne Point C No. 19 - CONFIDENTIAL (1135'-Kuparuk River) AFE 10-61-1150 API No. 50-029-21504. Ak. Permit No. 85-296. Elevation: 59' KB. Location: 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. (cont'd.) 12-28: Run 360 jnts of 3 1/2", 9.3 lb/ft L-80 tbg w/8RND thds. Stab seal assby into S.B.E. Perform isolation test. Place 15000# on 2B pkr & pump 4 bbl @ 10 bpm press = 1500 psi - no returns. PU to neutral pnt, drop ball & press up to set pkr. HB pkr set @ 11341'. Press up & shear out, shear sub @ 2850 psi - bleed off press. PU & shear out of PBR w/45000 lb over string wt. Space out (9' of seals in PBR) install hgr & test control line to 5000 psi. Stab into PBR to chk space out. PU & RU to displace w/hgr above bag. Displace w/108 bbl of diesel (=10bbl over). Shut in press = 10.55 psi. Drain. Stack U tube well for 1 min. Shut in press - 970 psi. Open annulus, flow well while lndg tbg lock down. Test SSSV, test backside w/1500 psi. Shut in press = 640 psi. Install 1-way chk. Clear floor. LD Kelly for inspection. ND BOP, NU tree - test to 5000 psi. Close SSSV. Install BPV. RIG RELEASED. C01'1C CO Tom Painter Dtwsion Manager Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 December 23, 1986 Mr. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99503 Dear Mr. Chatterton: Temporary Shut-in of Production and Injection Wells Within the Milne Point Unit As you are aware, Conoco et al. has filed an application with the Department of Natural Resources to temporarily discontinue production operations at Milne Point. The attached sundry notices are intended to serve as notice of the pending temporary shut-in of all wells located within the Milne Point Unit. There are 19 active and 5 inactive production wells at Mien_ Point. =CiIVE: B-3, B-4A, 5-6, B-9, E-tO, .x_~ .B-t3 ~-~5 x-16 C-2 C-3 C-4, C-5A, C-7, C-9, C-i3, C-i~, C-16 C-l, , , A ~{" T f'~ 3-20, B-21, B-22 C-!7, C-i& ~ active production wells will be freeze protected bv di=~'--"-- the top 3000' of the tubing with a i:3 diesel:oil mixture. %he annular fluid levels will be monitored ;or ~e~,,~ gas lift valves, ir necessary the production casing annulus will be displaced with a diesel:oil mixture to at least 3000'. Once the shut-do~-n operation is completed, pressure surveys %-iI! be run in all production ~'e!ls. After the surveys are run BPVs will be installed and =zi SCSSVs and wellhead valves will be closed. The inactive production wells have been adequately freeze protected with diesel across the permafrost. There are currently ten active and six inactive water injection wells in the Milne Point Unit ~ ~{ ' : '" ~ ACTIVE: B-8, B-12, B-14, B-17, B-18 C-8, C-ii, C-12, C-15 C¥P-2 STATIC: B-5A, B-7, B-19 C-6, C-10, C-19 Active water injection wells will be freeze protected by displacing the tubing to at least 2000' with a 50:50 water:methanol mix. The SCSSV and wellhead valves will remain open for two to three weeks after the well is shut-in to monitor wellhead pressure. When adequate wellhead data has been obtained the BPYs will be set and the SCSSVs and all wellhead valves will be closed. The static injection wells are currently freeze protected and no additional work will be required. Injection water is supplied by three water source wells. Though only one well is active at any given time, all wells are capable of produc- ingo A-2A; B-I; CFP-1 Water source wells will be freeze protected by displacing the tubing to at least 2000' with a 2:1 propylene glycol:water mixture. After the wells have been displaced with the glycol:water the BPVs will be set and all wellhead valves will be closed. The E-2 gas storage well has been shut-in since July 1986 due to a tubing leak. The wellbore is filled with natural gas so that freezing is not a concern, but to prevent potential corrosion an inhibitor will be displaced into the well. A 50:50 methanol:water mix will be used to carry the inhibitor. if you have any cue=~ions cn the =h~'~dc%m. ~-o~=d,'re zlea~ contact Don Girdler at 56a-7637. Yours very truly, Y~v~sion bianager STATE OF ALASKA ALASK,-, OIL AND GAS CONSERVATION COMrV, .,ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown Re-enter suspended well l--J Alter casing [ 1 Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate I ] Other 2. Name of Operator Conoco Inc. 3. Address 3201 C Street, Ste. 200, Anchorage, Alaska 99503 4. Location of well at surface 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. 5. Datum elevation (DF or KB) 59' KB feet 6. Uni.t or~ Prop..erty n. am..e .. ~izne rolnt unzt 7. Well number At top of productive interval 627' FSL, 984' FEL, Sec. At effective depth N/A At total d_epth 1135' FNL, 1326' FEL, Sec. 4, T13N, R10E, U.M. 4, T13N, R10E, U.M. 8. Permit number 85-296 9. APl number 50-- 029-21504 10. Pool Kuparuk River 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12250 7463 N/A feet Plugs (measured) feet feet Junk (measured) feet Casing Length Structural Conductor 80' Surface 6748 ' Intermediate Production 12166 ' Size Cemented Measured depth True Vertical depth 16" To Surface 115' 115' 9 5/8" 2125 Sxs 6784' 4648' 7" 375 Sxs 12200' 7440' Liner Perforation depth: measured 11819'-780';11602'-598';11578'-561';11557'-553';11498'-78' true vertical 7255'-36'; 7150'-47'; 7137'-29'; 7127'-25'; 7098'-88' Tubing (size, grade and measured depth) 3½", L-80, 11669' Packers and SSSV (type and measured~ep'Rth) SCSSV @ 1918'; Ret. Pkr. @ 11341'; Perm. Pkr. @ 11640 12.Attachments Description summary of proposal/~. Detailed operations program E~ .BOP sketch Iii 13. Estimated date for commencing operation January 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~__ ~,t~ ~_ _ Titles.,. n---~, -,,,.,,~,.,.-,,., ....... ~'---',.,L.~, ...... ..... Commission Use Only Date Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance Approved by Commissioner Form 10-403 Rev 12-1-85 / by order of / the commission Date / Subrfiit in triplicate John R. Kemp Division Manager Warren J. Hairford Division Operations Manager Gordon A. Hitchings Division Projects Manager Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 March 31, 1986 Harold Hedlund State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Hedlund: Attached are the originals and one copy of each of the Sundry Notices required to remove the suspended status from currently active wells. Should you need additional information or have any questions, fee] free to call Lynn Alexander at 694-7609. Very truly yours, Everett D. Wilson Division Administrative Manager LA/vv STATE OF ALASKA ALASKA -'_ AND GAS CONSERVATION CC ,VllSSION SHNDR¥ AND CN 1. DRILLING WELL COMPLETED WELL OTHER 2. Name of Operator CONOCO INC. 3. Address 3201 "C" Street, Ste. 200 / Anchorage, Alaska 99503 4. Locat,on of Well 1429' FSL, 2531' FEL, Sec. 10, T13N, R10E, Umiat Meridian 7. Permit No. 85-296 8. APt Number 50- 02921504 9. Unit or Lease Name - Mille Point Unit 5. Elevation ,n feet (red,cate KB, DF, etc.) 52' KB 12. Lease Designation and Serial No. ADL 47434 10. Well Number C-19 11. F~eldand Pool Kuparuk River Field Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF- (Submit in Triplicate) Perforate r-] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tub,ng [] Other [] Pulling Tubing (Note. Report multJale completions on Form 10-407 with a submitted Form 10-407 for each completion ) (SubmJt ~n Duplicate) [] Altering Casing [] [] Abandonment [] [] Other E~ 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). This well was brought on as an oil producing well on 3-5-86, and its suspended status should be removed. iT 14 Ihereby certify that the,~fo~olng is tr_ue and c_a~ect to the best of my know~.Leage. By Order of Approved by COMMISSIONER the Commission Form 10-403 Date Rev 7-1 ~30 Submit "Intentions" ~n Tr~ol~cate and "Subsequent Reports" ~n Duolfcate Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 March 4, 1986 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: Well Completion Reports for MPU Wells C-17 and C-19 Attached for your information and file are the original and one copy of each of the required reports referenced above. If you should have any questions please call Lynn Alexander at 564-7609. Very truly yours, Everett D. Wilson Division Administrative Manager LA/vv Att. '~" STATE OF ALASKA -- ALASK~ ,L AND GAS CONSERVATION C 'MISSION ,. W'ELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Serwce Well OIL [] GAS [] SUSPENDED [~ ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Conoco I nc. 85-296 3. Address 8. APl Number 3201 C. Street, Suite 200, Anchorage, AK 99503 5o-029-21504 4. Location of well at surface 9. Unit or Lease Name t468 FSL, 2329' FEL, Sec 10, T13N, RIOE, U.M. Milne Point Unit At Top Producing Interval T~'~ ;"i ~. ; ." ,?[ 10. Well Number 627' FSL, 984 FEL, Sec 4, T13N, R10E, U.M. ~,,'::,;',~.D ! C-19 At Total Depth' i S,,'.; __ -~-----.i 11. F~eld and Pool =Nu ~-99-~-FS-L, 1326 FEL, Sec 4, T13N, R10E, U.M.i~.,~: .... ~_J~ Kuparuk River Field 5. Elevation ,n feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 52' KB, 17' DF ADL 47434 12. Date Spudded 13. Date I.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, ~f offshore 16. No. of Complet,ons 12-19-85 12-21-85 12-28-85 NA feet MSL 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 12;250 'MD (7463 ' ) 11831'MD(7261') YESJ~] NO [] 1918' feetMOI -+1800'MD 22. Type Electric or Other Logs Run FDC-CNL-GR-Ca 1 -Di L-CHL-SP-FNC-CCL-Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE iTOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 48# H-40 0 103' 17" 100 cf Perm C .. 9-5/8" 36# K-55 0 6784 14½" 1850 sks. Perm E " 275 sks. Class G 7" 26# L-80 0 12,200 9¼' (est.) 375 sks. Class G I 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, s,ze and number) 5I' 12SPF wi rel i ne S~ZE . DEPTH SET (MD) PACKER SET (MD) INTERVAL TVD ZONE "~:t,I 9 3~,L-8b 11669' 11 341' 'HB' 11,819'-11,800' 7255-7236' LK-2 11,640', '2B' 11,800'-11,7~01 7255-7236' LK-2 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11,602'-11,598' 7150-7147' L-9 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11,578'-11,561' 7137-7129' L-8 11,557'-11,553' 7127-7125' L-7 11,498'-11,478' 7098-7088' MK-1 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCr WATER-BBL CHOKE SIZE IGAS'OILRATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core ch~ps. -- Form 10-407 Submit m duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. GEOLOGIC MARKERS KA MA NA OA T/Kup. NAME Interva MEAS DEPTH TRUE VERT DEPTH 5187 5691 6153 6408 11,180 3756 4035 4290 4435 6937 Middle Kuparuk 11,477 Lower Kuparuk 11,738 31. LIST OF ATTACHMENTS 11529 11,790 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and trane of each phase 3"2° I hereby certify that the foregoing ~s true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and ~n any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Fnrm 1N-~N7 ~conoco~ WATER FLOW ADVISOR PL ADVISOR MPU C- 19 Company - CONOCO, INC. Field - MILNE POINT Logging Date - 06-JULY-1990 Processing Date - 18-JULY-1990 Reference - 73952 Water Injection Well Schlumberger Well Services Alaska Division Computing Center 500 West International Airport Road Anchorage. Alaska 99518 907/562-2654 INTERPRETATION SUMMARY Water Injection Well - 2975 BWPD Zone Injection Water % of MK-1 L-7 L-8 L-9 LK-2 Interval BPD Total 11478-11485 0 0.0 11485-11501 215 7.3 11553-11557 275 9.4 11561-11565 12 0.4 11598-11602 0 0.0 11780-11784 0 0.0 11784-11792 985 33.7 11792-11799 0 0.0 11799-11820 1440 49.2 Total Injected Water 2927 100.0% Zone Water % of Total MK- 1 215 BWPD 7.3% L - 7 275 BWPD 9.4% L - 8 12 BWPD 0.4% L - 9 0 BWPD 0.0% LK - 2 2425 BWPD 82.9% Surface well head injection pressure was 2910 psi. Well C-19 was logged in two parts: 1.) Water being injected into all zones at once. The CFM was used to determine the injection pro- file between GLMs and below the tubing tail. 2.) The Water Flow Log (WFL) was used to determine the injection profile behind the 3.5 inch tub- ing. There was a tubing plug set in the tubing tail while the WFL log was run. The injection rate during the WFL Log was almost the same as that of part one. Additional information- There is a 100 BPD leak past the lower packer. The well is deviated 62 degrees. ~COflOCO~ WATER FLOW ADVISOR MPU C- 19 Company Field Logging Date Processing Date Reference - CONOCO, INC. - MILNE POINT - 06-JUL Y- 1990 - 17-JUL Y- 1990 - 73952 Water Injection Well Schlumberger Well Services Alaska Division Computing Center 500 West International Airport Road Anchorage, Alaska 99518 907/562-2654 CONOCO, INC. Milne Point MPU C- 1~ Water Flow Logs 06-Jul-90 INTERPRETATION SUMMARY Data from Water Flow Log Surface Injection Rate - 603 BWPD Zone Injection Water % of Interval bpd Total MK- 1 11478- 11485 0 0.0 11485- 11501 215 35.7 L- 7 11553 - 11557 275 45.7 L-8 11561 - 11565 12 2.0 L-9 11598- 11602 0 0.0 Leaking Packer 11640 100 16.6 r- Total Injected Water 602 100.0% ®The tubing tail has a tubing plug set in it. ®The lower packer or seal assembly is leaking at 11640 feet. ®The deviation of the wellbore is 62 degrees. _-.::.:.'.':::;'.... ;.*.';'; ..' .: .... -; - ; :- -:.. - .- :: ; __ GAMMA-RAY 1990 DOWNHOLE WATER INJECTIO~I RATE, BPD 10 (GAPI) 110 0. (BWPD) 800 11400 I " .... ' .... ' " "'" ....... ' ' ' I I I !-:-'- -"; ;":': ': -;- ~ 'i'i-iiiiii: :: :' .=,r.. ::!:'- !;: -:':- t i I , , 11700 CONOCO, INC. ~-- Milne Point MPU C- 1~ Water Flow Logs 06-Jul-90 6O3 BWPD Minitron Detector Det. Measured Flow No. Depth (ft) Depth (ft) Type Velocity Area(in~) 1 11400.3 11415.2 GR 78.1 4.79 2 11476.2 11478.2 Far 19.8 15.03 3 11478.2 11480.2 Far 20.3 15.03 4 11480.2 11482.2 Far 19.1 15.03 5 11482.1 11484.1 Far 20.6 15.03 6 11484.2 11486.2 Far 22.8 15.03 7 11486.1 11488.1 Far 17.4 15.03 8 11488.2 11490.2 Far 17.2 15.03 9 11490.1 11492.1 Far 16.8 15.03 10 11492.1 11494.1 Far 17.3 15.03 11 11494.2 11496.2 Far 17.0 15.03 12 11496.1 11498.1 Far 16.6 15.03 13 11498.2 11500.2 Far 15.9 15.03 14 11500.1 11502.1 Far 15.7 15.03 15 11502.1 11504.1 Far 14.6 15.03 16 11550.3 11552.3 Far 14.3 15.03 17 11552.1 11554.1 Far 14.5 15.03 18 11554.2 11556.2 Far 13.3 15.03 19 11556.2 11558.2 Far 3.7 15.03 20 11558.2 11560.2 Far 4.5 15.03 21 11560.2 11562.2 Far 4.4 15.03 22 11562.3 11564.3 Far 3.9 15.03 23 11564.1 11566.1 Far 2.4 15.03 24 11566.1 11568.1 Far 2.5 15.03 25 11568.1 11570.1 Far 2.8 15.03 26 11570.1 11572.1 Far 2.2 21.31 27 11572.2 11574.2 Far 2.1 21.31 28 11574.1 11576.1 Far 1.8 21.31 29 11575.7 11577.7 Far 1.8 21.31 30 11578.1 11580.1 Far 1.8 21.31 31 11580.2 11582.2 Far 2.0 21.31 32 11588.1 11590.1 Far 2.8 21.31 33 11596.2 11598.2 Far 4.3 21.31 34 11598.1 11600.1 Far 4.7 21.31 35 11602.3 11604.3 Far 4.9 21.31 36 11610.2 11612.2 Far 3.7 21.31 37 11626.2 11628.2 Far 4.3 21.31 38 11631.0 11633.0 Far 4.1 21.31 39 11643.3 11645.3 Far 4.3 21.31 CONOCO, INC. Milne Point MPU C- 1', Water Flow Logs 06-Jul-90 Processed Data Depth Interval Average Average No. (ft) - (ft) Velocity Flow Rate 1 11400.3 - 11476.2 78.1 666.4 2 11476.2 - 11478.2 20.5 547.7 3 11478.2 - 11480.2 20.5 547.7 4 11480.2 - 11482.1 20.5 547.7 5 11482.1 - 11484.2 20.5 547.7 6 11484.2 - 11486.1 20.5 547.7 7 11486.1 - 11488.2 17.5 468.0 8 11488.2 - 11490.1 17.2 460.7 9 11490.1 - 11492.1 17.0 456.3 10 11492.1 - 11494.2 17.0 456.3 11 11494.2 - 11496.1 17.0 455.7 12 11496.1 - 11498.2 16.6 444.4 13 11498.2 - 11500.1 15.9 425.9 14 11500.1 - 11502.1 15.7 420.3 15 11502.1 - 11550.3 14.6 390.8 16 11550.3 - 11552.1 14.4 385.5 17 11552.1 - 11554.2 14.4 385.5 18 11554.2 - 11556.2 13.3 356.0 19 11556.2 ~ 11558.2 4.2 111.6 20 11558.2 - 11560.2 4.2 111.6 21 11560.2 - 11562.3 4.2 111.6 22 11562.3 - 11564.1 3.9 105.0 23 11564.1 - 11566.1 3.7 99.5 24 11566.1 -11568.1 3.7 99.5 25 11568.1 -11570.1 3.7 99.5 26 11570.1 -11572.2 2.6 99.5 27 11572.2 -11574.1 2.6 99.5 28 11574.1 -11575.7 2.6 99.5 29 11575.7- 11578.1 2.6 99.5 30 11578.1 - 11580.2 2.6 99.5 31 11580.2 - 11588.1 2.6 99.5 32 11588.1 - 11596.2 2.6 99.5 33 11596.2 - 11598.1 2.6 99.5 34 11598.1 - 11602.3 2.6 99.5 35 11602.3 - 11610.2 2.6 99.5 36 11610.2 - 11626.2 2.6 99.5 37 11626.2 - 11631.0 2.6 99.5 38 11631.0 - 11643.3 2.6 99.5 39 11643.3 - 11645.3 2.6 99.5 PL ADVISOR Production Logs Interpretation Using a Global Solver (V3) MPU C- 19 Company Field Logging Date Processing Date Reference - CONOCO, INC. - MILNE POINT - JUL 02,1990 - JUL 18,1990 - 73952 Water Injection Well Schlumberger Well Services Alaska Division Computing Center 500 West International Airport Road Anchorage, Alaska 99518 907/562-2654 CONOCO, INC. Miine Point MPU C- 1_ Production Logs 06-Jul-90 INTERPRETATION SUMMARY Zone GLM's LK-2 Data from Continuous Flowmeter Surface Injection Rate- 2975 BWPD Injection Water % of Interval BPD Total 630 20.6 11780 - 11784 0 0.0 11784 - 11792 985 32.2 11792 - 11799 0 0.0 11799 - 11820 1440 47.2 Total Injected Water 3055 100.0% The well is deviated 62 degrees° GAMMA-RAY ~ DOWMJOLE WATER I~JECT~ON RATE, BPD ::::::::::::::::::::::: :~:i:~:~:!:~:~:~:~:~:~:~ ~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~:~: ~:~:~:~:~:!:!:~:~:~:~:~ ::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: 11800 ~ ~:~:~:~:~:~:~:~:~:::~:~:~:~:~:~:~:~:~:~:~:~:~ :~~ , 11400 'i1450 11700 11800 O. ! i CONOCO, INC. ~- Milne Point MPU C- 1_ Production Logs 06-Jul-90 COMPUTED CUMULATIVE FLOWRATES At Downhole conditions Zone Depth Depth Total Water Oil Gas Global # DH Rate DH Rate DH Rate DH Rate Inco- Feet Feet Bpd Bpd Bpd Bpd herence 1. 11830.0 11820.5 0. 0. 0. 0. 0.000 2. 11799.0 11792.5 1438. 1438. 0. 0. 0.001 3. 11784.0 11674.5 2420. 2420. 0. 0. 0.000 4. 11638.0 11468.5 2423. 2423. 0. 0. 0.012 5. 11450.0 11426.5 2423. 2423. 0. 0. 0.651 6. 11410.0 11380.5 3056. 3056. 0. 0. 0.029 COMPUTED FLOW DESCRIPTION Assuming a 1 - 11/16" tool presence Zone Water Gas Mixture Friction IAq/Liq Gas/Liq Flow # Holdup Holdup Density Gradient Slip vel Slip vel Regime Gr/cc Gr/cc Ft/mn Ft/mn 1. 1.000 0.000 0.970 0.000 0.00 0.00 No Flow 2. 1.000 0.000 0.970 0.000 0.00 0.00 WATER 3. 1.000 0.000 0.970 0.001 0.00 0.00 WATER 4. 1.000 0.000 0.970 0.067 0.00 0.00 WATER 5. 1.000 0.000 0.970 0.067 0.00 0.00 WATER 6. 1.000 0.000 0.970 0.102 0.00 0.00 WATER CONOCO, INC. Milne Point MPU C- 19 Production Logs 06-Jul-90 PL Advisor Program Parameters for Zone 3 (at downhole conditions) Zone bottom depth ............................................... 11784. Feet Zone top depth ................................................... 11675. Feet Pipe internal diameter .............................................. 6.276 Inches Pipe Deviation ..................................................... 62.00 Degrees Pipe absolute roughness ........................................... 0.0006 Inches Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 149.9 DegF Minimum water rate ............................................... 2420. Bpd Maximum water rate ............................................... 4000. Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ................................................. 1.606 Resolution ........................................................ 2.000 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor ................................................. 0.0000 Inches Ft/mn DegF PL Advisor Program Parameters for Zone 4 (at downhole conditions) Zone bottom depth ............................................... 11638. Feet Zone top depth ................................................... 11469. Feet Pipe internal diameter ............................................ 2.992 Inches Pipe Deviation ..................................................... 30.00 Degrees Pipe absolute roughness ........................................... 0.0006 Inches Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 149.3 DegF Minimum water rate ............................................... 2423. Bpd Maximum water rate ............................................... 4000. Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ............................................... 0.8910 Resolution ........................................................ 2.000 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor ................................................. 0.0000 Inches FtJmn DegF CONOCO, INC. Milne Point MPU C- 15 Production Logs 06-Jul-90 PL Advisor Program Parameters for Zone 1 (at downhole conditions) Zone bottom depth ............................................... 11830. Feet Zone top depth ................................................... 11821. Feet Pipe internal diameter .............................................. 6.276 Inches Pipe Deviation ..................................................... 62.00 Degrees Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 150.1 DegF Minimum water rate .............................................. 0.0000 Bpd Maximum water rate .............................................. 0.0000 Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ................................................ 0.5190 Resolution ........................................................ 2.000 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor ................................................. 0.0000 Inches FtJmn DegF PL Advisor Program Parameters for Zone 2 (at downhole conditions) Zone bottom depth ............................................... 11799. Feet Zone top depth ................................................... 11793. Feet Pipe internal diameter .............................................. 6.276 Inches Pipe Deviation ..................................................... 62.00 Degrees Pipe absolute roughness ........................................... 0.0006 Inches Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 150.0 DegF Minimum water rate ............................................... 1438. Bpd Maximum water rate ............................................... 4000. Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ................................................. 1.606 Resolution ........................................................ 2.000 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor ................................................. 0.0000 Inches FtJmn DegF CONOCO, INC. Milne Point MPU C- 1,. Production Logs 06-Jul-90 PRODUCTION LOG MEASUREMENTS Zone o . . . Depth Spinner Thermo #1 #1 Feet Ft/mn DegF 11830.0 0.00 137.231 11820.5 134.355 11799.0 16.24 11792.5 101.383 100.465 11784.0 27.35 99.565 11674.5 98.901 11638.0 217.12 11468.5 11450.0 210.63 11426.5 11410.0 273.39 11380.5 98.772 98.658 98.659 98.628 98.617 98.555 MEASUREMENT RECONSTRUCTION QUALITY Measured minus Reconstructed values 'Zone # . 2. 3. 4. 5. Spinner #1 Ft/mn 0.00 0.00 0.00 -0.02 -6.51 0.06 Thermo #1 DegF 0.000 -48.666 -20.278 0.044 0.013 -10.242 CONOCO, INC. --- Milne Point MPU C- 1. Production Logs 06-Jul-90 PL Advisor Program Parameters for Zone 5 (at downhole conditions) Zone bottom depth ............................................... 11450. Feet Zone top depth ................................................... 11427. Feet Pipe internal diameter .............................................. 2.992 Inches Pipe Deviation ..................................................... 30.00 Degrees Pipe absolute roughness ........................................... 0.0006 Inches Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 148.3 DegF Minimum water rate ............................................... 2423. Bpd Maximum water rate ............................................... 4000. Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ................................................ 0.8910 Resolution ........................................................ 10.00 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor ................................................. 0.0000 Inches FL/mn DegF PL Advisor Program Parameters for Zone 6 (at downhole conditions) Zone bottom depth ............................................... 11410. Feet Zone top depth ................................................... 11381. Feet Pipe internal diameter .............................................. 2.992 Inches Pipe Deviation ..................................................... 30.00 Degrees Pipe absolute roughness ........................................... 0.0006 Inches Average injection pressure .......................................... 5310. Psi Water density ..................................................... 0.9700 Gr/cc Water viscosity .................................................... 0.7200 Cp Reservoir fluid temperature ......................................... 148.1 DegF Minimum water rate ............................................... 3056. Bpd Maximum water rate ............................................... 4000. Bpd Continuous flowmeter # 1 Blade diameter .................................................... 1.688 Geometrical factor ................................................ 0.8930 Resolution ........................................................ 2.000 Confidence factor .................................................. 1.000 Thermometer # 1 Resolution ....................................................... 0.0100 Confidence factor .................................................. 0.0000 Inches FtJmn DegF MILNE POINT UNIT C-19 ACTUAL COMPLETION SKETCH COMPLETED ON 12-28-85 FMC TUBING HANGER w/ 3 ~/z" 'H' BPV PROFILE NOTES: 1. All meeeuremente are from KDB of Nabors 27 E 2. KDB- SL 52 3. KDB - GL --.3 s/z" 9 2 lb/fi L'80 BTRS (2992 '10, 2867" dr,fi) 4. Max. angle 61 5° ~'~ TO 5. KOP 500' ~. Slant type hole 7. Min. angle N A -- 1918' CAMCO TRDP - IA SSA SSSV (2 812" ID ) 8. FMC 3 1/8' APl 5000+ tree with 3 112' 8 rd. treetop connection. e. Din. reetrlctlon la CAMCO ' D' N,pple 2 75" 10. APl No. 50 - 029 - Zl§04 11. Completion fluid I0 2 I)1:)~3 NaCI/NoBr Callng ind cement information on riling In(I cement IKelch. PERFORAT IONS ,~" hollow carrier retrlevaOle on wl~'ehne 12 SPF 120° phos,ng RUN INTERVAL TVD ZONE IlBI9 - 11800'"~ (7255 - 7236' ) ll800- 117BO .3 11602 - 11.598' (7150 - 7147 ') 11578- 11561 ' (7137- 7129') 4 ll557 - t1§5:~' (7127 - 7125' ) 11498 - 11478' ( 7098- 7088') Basea on DIL ooleo 12- 24- L-9 L-8 L-7 ~ 11,327 BOT PBR Seal AssemDly . 34 I BOT ' HB' Hydraulic Packer ( 2 890" ID ) ,3~)1 CAMCOW-I Selechve N~pple (28l " ID) 11,417' C~.~C 0 t/2 MMG- 2 Mondrel(2 92 ~O) I -- tl,456 --11,466 Blast joints ( I00' Total length, 4 5" OD ) 639 BCT CL' Locofor Seal A$$emoly 11,640 BCT '2B' Permonenl Packer &Seal Bore 4 0" ID )mmlloul e~l ( 4 408 ' I0 ) OD, 11,663' CAMCO '0' N,pple (2 75" ID) "11,669' Tub,ng Tod 0, FISH I ~/t CAMCO RG-2 C,rculohon Valve w/ RKP Latch '3- 2 - 86 ) 11,8'31' PBTD (Wlrel,ne tog) 12,200' 7" 26# L- 80 BTRS ( 6 276" ID, 6 O59" dr,fl ) Eastman ~ ', Whipstock l~~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TION,4 L SURVEY CON(~CO, In('. or: S]one, Alaska LOCATION JOB NUMBER 450-024 TYPE OF SURVEY Gyro Nu it i---SNot RECEIVED DATE 2 ~- -D]~]C- ,q 5 SURVEY BY B JAHN F E B O ~ !988 Alaska (hi ~ Gas Cons. Commission Anchorage OFFICE Anti:orate, Alaska Eastman Date: January 30, 1985 (907) 563-3650 P. O. Box 4-1970~Anchorage, Alaska 99509-1970 Conoco, Inc. 3201 C. Street Suite 200 Anchorage, Alaska 99503 Well Number: Pad C, Well No: 19 Location: Milne Pt., North Slope, Alaska Type of Survey: Gyro Multi-Shot Date: 26-DEC-85 Method of Computation: Radius of Curvature Surveyor: B JAHN Job Number: 450-024 Attn: Mr. Dan Robertson Dear Mr. Robertson: We are enclosing the original and one copy of the Gyro Multishot survey run on the above mentioned well. To date, the following distributions have been accomp- lished: A. 1 Copy delivered to drilling in-house ~ distribution. B. 9 Copies noted for oil company repre sent at ive s. C. 3 Copies for E/W permanent well files. We wish to take this opportunity to thank you for using Eastman Whipstock and look forward to being of service in the furture. TOM ~ Dist Technical coordinator TJ/pdh cc/file RECEIVED F E B 0 3 1986 Naska Oil & Gas Cons. Commission Anchor3ge cc: Kathy McGill O.G. Kiel - P.E.S. Reservoir Sect ion Conoco H.E. Gilliland - P.R.D. Reservoir Sect ion Conoco William Van Allen - Alaska Oil & Gas Conservat ion Commission J.I.. Weaver - Chevron U.S.A., Inc. Dave Engstrom - Chevron U.S.A. , Inc. San Ramone Jim Laws - Champlin Petroleum Co. C.E. Seery, Jr. - Reading & Bates Petroleum Co. Neil Buttram - Cities Service Oil & Gas Corp. Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide EASTMAN WHIPSTOCK, INC. RECORD OF SLIRVEY FOR * OPERATOR * STRLICTLIRE : F'AD C * WELL . * LO C A T I ON * ,_lOB NI_IMBER * DEF:L_ INATION : 3¢)_.~._,'-'~ E ~ RKB TO SEA : : E:ONOCO, INE:. . .,~. : 1'.:.,' SLOT : 19 , : MILNE POINT: NORTH '.=;LOF'E., ALA:E;KA F'LANE OF VERTIE:AL SEC:TION * . DIREE:TION : N 27 51 W * EW DI:_:;TRICT : ANCHORAGE, ALASKA Eastman [ CONOF:O~ INC:. ' FA[ C MILNE F'OINT NORTH ~' r , , .:,L JPE ALASKA · :,LLT : 1'.--.~ WELL : 1'.-.-; PBHL : N 27 51 W DATE PRINTED : .:,J-,_lAN-o6 OUR REF. NO. : S05487.7C0 dOB NUMBER : /--/.,50..-~ c/ 7 PAGE NO. 2 MEA.=,_iRED [RIFT DRIFT £:OIIR'.:;E TRUE VERTICAL SUBg;EA R E C T A N G U L A R C L 0 S U R E DOGLE( [EF FH ANGLE FIIRECTION LENGTH VERTICAL SEF:TION TVD C 0 0 R Fi I N A T E .S DISTANCE DIRECTION SVRTY D M D M DEPTH D M 0. O0 0 0 N 0 0 E O. 00 100.00 0 30 S 54 0 W 100.00 200.00 I 0 S 51 0 W 100· 00 :300.00 1 0 S 36 0 W 100· 00 400.00 1 0 S :]:5 0 W 100.00 5£)0.00 1 0 S 36 0 W 100.00 600.00 2 30 N 60 0 W 100.0£) 700.00 4. 30 N 4:]: 0 W 100.00 oOJ 00 7 1._, N :34 0 W 100.00 S"~00.00 10 15 N 2'? 0 W 100.00 499. ?4 -2.40 4,47. '.--.~4 5. 16 S 4.62 W 5'.T/,?. :z:_ 9. - 1 .64 547. :z:_ 9. ._,~. '74 .S 7 . :34 W /_-,'F~'?. 70 3. '.--./3 647.7(]) 1. '75 S 12. 1 C) W '7':..-~':.--~. 17 13. '78 747. 17 6.05 N 18.47 W · ~"~ '~ . · . m -- . :E:97 '.:.,"? -s..-F~, 15 c, 4._ 99 19 Ci2 N 2/-, 4.1 W 0.0('1 S 90 C) E C).00 (]) 44 S F,.z, 1 74 ~' ._~ W 0 .~0 ...-,~ %' ='_ .?., · ._1 3.4'7 S 48 12 W 0.26 ~ 4:3 ._, 19 :E: ~ ¢)2 .... 7w )... /_-,.72 S 41 50 W 0.02 .....~,~ :_::._ ~. ('). W 2 . .~'.--~_ 12.2-/-,_ c,._, :--:_ 0 51 W 2 .2 :--: 19.43 N 71 51 W 2. · :,~ ....... , N 54 1.5 W :B.OF.-' 1000. O0 13 0 N 28 0 W 100.00 ':.-/'.~/5. '.-.-/:3 1100.00 15 45 N 26 0 W 100.00 1(])'.--./2. 77 1200.00 18 30 N 26 0 W 100.00 1188.35 1300.00 21 45 N 27 0 W 100.00 1282.2 1400.0c) 24 45 N 29 0 W 100.00 1374. 1C) 36.72 N 36.03 W 58.84 N 47.30 W °5:3C) N 6C) 2c) W 116.(])'? N 75.55 W 15(3.94 N 74.c:8 W 51.44 N 44 27 W 2.76 = 4? 2 ..... .... N :]::E: 4F3 W -"':" 1 C) 4 4-1 N '-' = 1 '--' ]TFi . . .: .... W 2 1:3:E:. 5 ! N :33 :3 W :3.27 I77 ':'/- N :'"':1 =i/-. W '3 l(') . I..: :_m -- -- · -- ~ 1500.00 26 45 N 27 0 W 100.00 1464. 17 16,00.¢)0 2'.-} 45 N 2:3 0 W 100.00 1552.24 170C). 00 :30 4.5 N 30 0 W 100.00 16 :'-: :E: . /_-, :3 1:--:00.00 31 15 N :3:3 0 W 100.00 1724.:2:4 1'F;0(]).00:32:30 N :34 0 W 100.0C) 1809.26, 220. :B 4- 141. 2. 17 -':,L,p 16 !?;C)0 24. .]: 18.53 1586.6,.-:: ":: 69. '92 ! 6'72.34 422.47 1757.26 1:38.'?:3 N 115. 14 W 2:3 c) = '-, ..... _-, N 1:37. '7'3 274.5:E: N 162. t5 W :318.49 N 18'.-.-/. 06, W :36, 2.5:]: N 218.20 W '2'2 !, 2/. 1'4 :'--': 1 22 W 'T.', 00 26,:_::. F-'i 3 N :3(]) 51 W :i-':. 04. · -:: 1 :::: ,:,,:-, Iq :'::'.') :34 W 1 4 2 :'::70.38 r.,I :]:'}42 W v_'-,2 42:2:.1.3 Iq 3! 3 W _,.:36 2 C). (')_ (')_. (')- (')- ._.-_":' ~ ('). N ._'::._./- (') W 1 (')_ C). (') .... (') 1 :::'--~. ~'-';' .4 (')_ '-'..'100. 00 :36 15 N :36, ¢) W 100.00 !97:]:.69 2200.00:39 15 N :36 0 W I(])0.(')C) 2052.75 23Cx3.0cl 42 C) N :2:6, 0 W 100.00 2128.64 2400.00 44:30 N :37 0 W 100.00 2201.47 477.59 1840.4(3 535.25 1921.6,9 595. ::-: 4 200 C). 7.5 660.2'.--..' 2£)76,. 64 728.0 :]: 214'.-.-~. 47 4C:8.0:3 N 250.¢)6 W 455. 15 N 2:E:4.:3(] W 504.6:3 N 320.2:3 W 557.35 N 358.55 W 612.42 N 399.30 W 47:3.56 N 31 3o W 2.74 ~:-:',/-,./-~ N 31 F;9 W i 2~ 5'77.7:3 N .32 24 W :3.0C) 662.72 N :]:2 4.5 W 2.75 731.!0 N :3:3 ,5 W 2.59 2500.00 47 45 N 38 0 W 10C). C)0 2270.77 7'F.,".T,'. O:Z-:2218.77 2600.00 5C) 0 N :36 0 W 1C)0.0c) 2:3:3/_-,. 5:2: 87:3.44 22:34.53 270C). 00 51 :]:0 N 35 C) W 100.0C) 23'F/9. C-:0 '750. 1S' 2:]:47.80 280(]). 00 54 45 N :35 0 W 100.00 2459.8¢) lC~2'F.'. 55 2407.80 27.~00.00 57 15 N 3:5 0 W 100.0C) 2515.72 1111.8¢) 2.46:3.72 Iz:ONTINI_IED I]N NEXT F'AGE ... 66'.--.~. 6,(':, N 729. '75 N /. ,..:E:O N 85:3. :31 N 'F'2/_-,. 22 N CONOCO, INC:. PAD C: MILNE F'OINT, NORTH SLOPE, ALA'.=;KA S L CI'F : 1 '=-; WELL : I'F~ PBHL : N 27 51 W DATE PRINTED : 30-,JAN-:=:6 OUR REF. NO. : S05487.7C0 ,_lOB NUMBER : ~-~0--0 ~ c/ PAGE NO. MEASURED DRIFT DRIFT COURSE TRUE VERTICAL SUBSEA R E C T A N G IJ L A R C L 0 :--; L! R E BOGLE, DEF'TH ANGLE DIREC:TION LENGTH VERTIE:AL'"".:,E_.TIONf"" :"VD C: 0 0 R 'R I N A T E 'S DI'.-];TANCE DIRECTION SVRTY D M D I"1 DEPTH D M 3000.00 57 45 N 33 0 W 100.00 2569.45 1195.66 2517.45 996.14 N 3100.00 57 30 N 31 0 W 100.0(]) 2622.99 127'F;.:--:'.-} 2570.99 1067.76 N 3200.00 57 15 N 31 0 W 100.00 2676.91 1:363.99 2624.'.--.'1 t1:_s:'Y¢.96 N 33 0 0 0 0 .~'"' .=,o .-, .-, · ._ / 0 N -,_, 0 W 100.00 .. 7.:, 1. 19. 1447. 'F;2 267'.-}. 19 121 :--:. 04 N 3400· 00 57 0 N 27 0 W 100.00 :2785.65 15:31.79 273:3.65 1287.4:--: N 3500.00 5&, 30 N 'F-:7 0 W 100.00 2840.48 1615.4.1 2788.48 1:361.94 N 3600.00 5& 45 N 27 0 W 100.00 2895.4'=) 1698.91 284:3.4'.-.-~ 14:36. :35 N 3700.00 56 15 N 27 0 W 100.00 2'F;50.69 1782.28 28'78. 6'.-} 1510.65 N 3800.00 56 0 N 27 0 W 100.00 3006.43 1865.:30 2954.4:2: 1584.62 N 674.06 W 1202·77 N 34 5 W 1.76 718.81 W 12:-]:7.17 N 33 57 W 1.71 762.19 W 1371.29 N 33 46 W 0.25 803.54 W 1455.04 N 3:.--: 31 W 2.53 :_--:42.26 W l~:q:::. 47 N :3:3 12 W "84 ) 880.2:3 W 1621.64 N :32 52' W 0.50 918. 14 W 1704.7:3 N 32:35 W 0.25 '756.00 W 1787.74 N :32 :.]'0 W 0.50 99:3.69 W 1 ::=", 70.42 N .32 5 W 0. -25 4000.00 ',55 45 N 25 0 W 100.00 311:3.45 2030.8'.-.-~ :3066.45 1733.53 N 1¢)66.:32 W 2035.24 N .31:36 W O.:E:/=, 4100.0(:) 56 0 N 24 0 W 100.00 3174.54 211:!':.5:}:: 3122.54 1:308.::2:6 N 1100.,/_-,5 W 2117.4! N :31 19 W 0.S,'.':, 420(') (')(') .57 17] N .-'._,'-'= 0 W 1¢)0 0(') '::':":":' .:;/-, ....... 21'?i-,. :::9 :31'77 ~/-, 1:_--::!::4 ':'.~ N 11'-' =:, ... , . 2:=-: W 22r)(') :2:4 N ']:1 4 W 1 =;' ' · ~ - '-- - · '-- .i-- ,l....' · ._1 ...) .... · · l--1 ._ . . I ,1 430C). 00 .=_';7 0 N 25 0 W 100.00 :_--:283.84 2280.77 :3231. :s:4 1'F;60. '76 N 1170.77 W 22:3:3. ::-::7 440(]). 00 5./.-, 45 N :25 0 W 100.00 3:2:3:_::. 4:3 2:'-':64.41 :.-.-:2:36.48 20:36.86 N 120L-,. 17 W 2:367.20 N .=:0 ---:8 W C). 25 4500 (')(-) =;6 :30 N 25 0 W 100.0C} :3 :3 '? :3 . :-] ¢) 2447 :-=:2 :3:'::41 .~¢) 2112 ='= N 124].46 W 2450· 32 N 30 26 W ¢) =.'% I . . ._ :1 _ . · · 41-,0¢) C)(-) .=l::: .3¢) N 2/-, 0 W 100 0¢) :2:447 22 '-'="-"-' ¢)::: '"'-'":;=. .... , ........... ~ .... :1~.... :,.:, .: ._, 22 21:38.67 N 12-277l 7 ~, W 25:2:4. --: -, N .2:0 17 W . J. 7 470(').. (](') ....... Fi::: ::',¢) N 2/-, 0 W 10¢). 0C) :_::4'.-)'F~. 4'7 '2617. '::0_ :3447.47 2'265. :::(')_. N 1'-':,1._' .~3. 14 W 26, Z'F;, .=:'.-='N :2:0 :E: W 0. ~'~(-1._.. 48C)O. oc) .....:;::: 4.5 N 27 0 W lOC). (')(').. .:'-'== 1 ....... , 54 27(:)2 . c' .... = :3-$?;"5', 54 2:2:41 . 71 N 1':'.~':'._,._ ._,. 24 W 27(])4 ,6,¢,_. N :::0_. 1 W ):=:'.-T~ 49¢)('~ 0(-} 57 45 N 27 0 W 1(')0 (])0 ~:/-,(')4 16 27:5:7 68 .:,5.~.s, 1~-, 24~7 47 N · . . · - · .... ] . m i 5000.00 57 30 N 26 0 W 100.00 3657.70 2:-]:72. 11 :36(])5.70 24'73.05 N 14:2'?. 5:3 W 2:373. :32 N 29 50 W 0. ~1(')¢) 0c~ ~':* 1~ N 27 0 W 100 00 :3710 14 2'?~7 o.:, -'/~'-' ~ .... :, :,._,,:, 14 ':' ~/-, ':~ '-' = '"- = '-' c, ,:, ,:~ .............._ . -__...~._, N 1467.._~ W ~ :' ._, ,-._ . :3 :3 N =.. 44 W 1. ..... . ~20(') 06) 57 (3 N 2/-, 0 W 100 C) c)._,7') /:,~'-'. 94 :3C) 42 1'-' :371(3 74 2645 24 N 1._,~L)'._~.41 W :R(')4:3 41 N 29..39 W 2.4 526)0 00 57 0 N ':'~ 0 W 100.00 3817.40 :31z~172 .:,76._ 40 2720 ~¢4 N lo4~ ~1 W :3127 27 N 90; :32 W 0, F'-=,O¢) (')(-) ~/-, ¢~ N ':'.~ (') W 100 00 :3'728. 15 :2:292 25 :--:876 15 2:371 :-]:7 N 1/-,11 :::':~ W '::2':z::: :::¢) N ':":.~ 1:3 W .~ /-, (') (') (3(-) 5/-, 0 N '-' = 0 W 100 00 3'.-.-~ 84 (')7 '-' '~ ~ .... · :,.:, 7 .... ¢).=, :::':;::: 2 07 2'? 47 01 N 164/-, ':;':: W '-"-' ~ = ........ -.' --, .............. _,.:,, ._,. 98 N 2':* 12 W c). 0C 5700 .................... 06) F,[- :=:(') N 26 (') W 100 00 4('~F:9 6:3 o4 .... :, 12 3987.63 3(])22.06 N 1~-°°~.72 W .:,'-'4='-':,. 96 N 2'FI -/ W 0. 5:300 ...... 0(-) 5A 45 N 2A 0 W 100 00 40'P4 64 :3541 ~'~ 4042 64 '~',¢~o7 11 N 1719 :::3- W ...... '~'~'s'~.34 N 2'~ 2 W ~'T~r)(') 0¢) ~z-, 15 N o~ r} W 100.00 4149:34 F:&24 '~'('~ 4097.84 :3112:3:E: N 1755 23 W ~'x~': ~::: ............... :.c,~._, N 28 57 W CONOCO~ INC:, SLOT : 1'? i]ATE PRINTED : 3C~-.,_iAN-86 PAGE NO. ~4 PAD C WELL : 1'.~¢ OUR REF. NO. : S05487.7C0 MILNE F'OINT, NORTH SLOPE, ALASKA F'BHL : N 27 51 W dOB NUMBER : z//~0-49~:¢ MEASURED DRIFT DRIFT COURSE TRUE VERTICAL SUBSFA R E C T A N G U L A R C L 0 S U R E DOGLEC DEPTH ANGLE DIRECTION LENGTH VERTICAL SECTION TVD C 0 0 R 1] I N A T E S DISTANCE DIRECTION SVRTY D M D M DEPTH D M 6000.00 56 15 N 23 0 W 100.00 4205.3'?~ 3707.86 4153.3'.-.-~ 3248.33 N 178';.-~.05 W 3708.41 N 28 51 W 1.66 6100.00 56 15 N 22 0 W 100.00 4260. '.-.-/5 37~0.64 4208. ':.-/5 3325.15 N 1820.86 W 37'F./1.06 N 28 42 W 0.8::: 6200.00 56 0 N 22 0 W 100.00 4316.67/ 3873.23 4264.67/ 3402.13 N 185I.';--'7 W 3873.53 N 28 34 W 0.25 6300.00 55 15 N 22 0 W 100.00 437:3. 15 3?55.34 4321.. 15 3478.65 N 1882.:--:8 W 3'.-7~55.54 N 28 26 W 0.75 6400 00 .5.5 c~ N 23 C~ W 1 c~ c~ 0 c~ 44 ;--: 0.33 4 c~ 37 02 4378 :':: 3 '-' ~' .s '~ . . . -- .......... :,._,._ ,e. 4.5 N 1 '..-'~ 14 28 W 4037 ]. ~ N 28 18 W ':'/- ,.. )r_, _f 7000.00 54 30 N 24 0 W 100.00 477.5. 17 4.526.28 472.3. 17 4c~06. 10 N 2106.77 W 4.526. ';._"?, N 2'7 44. W ,."). :_::..~ 7100.00 55 0 N 26 0 W 100.C~0 4:E:32.:--:8 4607.:--:Zl 4780.:E:8 4~'.~80.11 N 2.141.2.8 W 4607.86 N 27 41 W 1.71 7200.00 57 30 N 27 0 W 100.00 4888.4:--: 46'PC~. 'P6 4836.4:} 4154.51 N 2178. :]:7 W 4/:,'.--./(). '::::8 N 27 40 W :2-.'.. 7300.00 58 0 N 28 0 W I00.00 4?/4 1.7'F./ 4775.52 488'.--./. 7?/ 422'.:/. 53 N 2217.42 W 4 775.55 N 27 4(]) W 0. '.:.:'P, 7400.00 58 !5 N 28 0 W 100.00 4??4.60 4860.45 4'?.'42.60 4:304.5! N 2257.2? W 4860.47 N 27 40 W (). 2.5 7500.0c) 58:30 N 2:]: 0 W 100.00 5047.04 z17-45.57 49'?/5.04 4377.67 N 2297.27 ~.~ 4'.:"~5~62 N 27 4]. W 0.25 76,00.00 58 45 N 28 0 W 100.00 507/'.-.-/. 1(]~ 50:]:0. '?7 5047. 10 4455. (])7 N 23.37..]:!5 ~,4 50.--,'0. c,,.:/ ~'.! 27 4t W ;}. 2.5 7700. (')0 5'F./ 0 N 2? 0 W 100.00 5150.7'.:.) 511 ,'",. 57 .507~8.7? 4530.30 N 2:]:7::-:. 1 ':; W 5116.58 Ft 27 4 2 .W 0. :EV.-7~ 7800 00 ~:z: 4.~ N '--"-' .... ..,:, c~ W 100. c) 0 5202.48 5202. 16, 5150.48 46,05.5:3 1'4 2417.04 W 520:2.18 N 27 43 W '?79 7'.-7/00. 00 5? 15 N 28 0 W 100.00 5253. '.-7~?~ 5287. :::8 5201. '.--./'? 4681.21 N 245?. 2',]', W 5287. :--:'.:.) N 27 4:3 W ,_. 50 8 c) c) c~ 00 .=;::: 45 N 2'-.-~ 0 W 100 0 c) .=,'-',] ~ z~ 7 ~/- ....... : .... _, 4 ?~ 5:3 7:3 .=, 9 ='"" ='''' 4 ...... · -'. ,.:. 5 4 N 2 5 ('~c~ 18 W ~] :':: 7 :':-: - · · ....... -- -.w - . n _ _ _ . # _ ~ .- .. :--:100.00 5:--: 45 N 2:--./ 0 W 100.00 5357. :37 545'?/. 06 5:305.37 4::::--:1.31 N 2541.6:3 W 545'.:./. 07 N 27 45 W 0. ¢)0 8200.00 58:30 N 28 0 W 100.00 540?. 4:3 5544.4:--: 5357.43 47~06.34 N 2582. :]:7 W 5544.44 N 27 46 W 8300.00 58 30 N 28 0 W 100.00 5461.6,8 562?/.70 540'.~/.68 4781.62 N 2622.40 W 56,2'.--/. 70 N 27 46 W 0.00 8400· 00 58 15 N 2'? 0 W 100.00 5514.12 5714.84 5462.12 5056.45 N 2663.0:3 W 5714.84 N 27 46 W 0. :B500.00 58 30 N 2::: 0 W 100.00 5566.55 57'?/'?.78 5514.55 5131· 28 N 2703.65 W 57'.--./'.-}.'.-.-/8 N 27 47 W 0.8?/ :3600.00 5::: 45 N 28 0 W 100.00 5618.62 58:::5.36 5566.62 5206.67 N 2743.74 W 5:3:35.36 N 27 47 W 0.25 :2:700.00 5? 0 N 2:_:: 0 W 100.00 5670.31 5770.'.-7//_-, 5618.31 52:-]:2.25 N 2783.?2 W 5'F.,'70.76 N 27 47 W 0.25 8800.00 5'.-.-/ 15 N 28 0 W 100.00 5721./-,2 6056.7';} 5667.62 5358.03 N 2824.22 W 6056.7?/ N 27 4:3 W 0.25 :=:'--./c~c~. 00 .=l':./_. :::0_ N 2:--: 0 W 100.00 5772.57 6,142.84 5720.57 .~._4.:,4'~ .01 N 286,4.6,2 W 6,142. :34 N 27 48 W 0. F., tnmn, ,, cr-iNOCO, I NC. PAD C MILNE F'OINT, NORTH 8LOF'E, ALASKA SLOT : 1°..- WELL : 19 PBHL : N 27 51 W DATE PR I NTED : :--:O-,_IAN-:--:/_-, OUR REF. NO. : S05487.7C0 .dOB NUMBER : ~D-OZy' PAGE NO. ~ MEASURED DRIFT [;RIFT COLIRSE TRUE VERTICAl_ SUB:--;EA R E C T A N G U L A R C L 0 :--; U R E DOGLE DEPTH ANGLE DIRECTION LENGTH VERTICAL '.--:ECTION TVD C 0 0 R D I N A T E 8 DISTANCE DIRECTION 8VRT~ D M D M DEPTH D M 9000.00 59 30 N 28 0 W 100.00 5823.32 6229.00 5771.:--:2 5510.09 N 2905.07 W 622'9.01 N 27 48 W 0.0( 9100.00 59 30 N 28 0 W 100.00 5874.07 6315.17 5822.07 5586.17 N 2945.52 W 6315. 17 N 27 48 W 0.0( 9200.00 59 45 N 29 0 W 100.00 5924.64 6401.43 5872.64 5661.98 N 2986.6D W 6401.4:]: N 27 49 W 0.9C 9300.00 59 30 N 30 0 W 100.00 5975.20 6487.66 5923.20 5737.07 N 3029.17 W 6487.66 N 27 50 W 0.9( 940o Orb ?,'--~ 30 N 30 0 W 100.00 /-,o27] 9!-, 657:3 77 ~'--~7':' '--'/- .%'-' ........ ..- ,_,._ ,_-, 11 6'9 N 5:i'D'72 "' ~ /' ~' '-' ~"-' 0 ~2 .................... ..--._ W : .... 7.:,. 77 N 27 ._~. W ~ 9500.00 59 0 N 31 0 W 10¢).00 6077.0? 6659.61 6025.09 5885.7:B N :}.':115.:::7 W 6659.62 N 27 54 W 0.9'i 9600.00 59 0 N 30 0 W 100.00 6128.59 /_-,745.24 6076.59 595'.-.-~.59 N 3159.:37 W 6745.25 N 27 56 W 0.8/: 9700.00 58 45 N 29 0 W 100.00 /_-,180.28 6830.80 6128.28 /_-,034.0'7.~ N :'-':201.52 W 6830.:--:! N 27 57 W 0.8'i 9800.00 59 30 N 29 0 W 100.00 623!.60 69i6.62 6!79.6o 6109.16 N 324:3. i:B W 6916.63 N 27 58 W 0.-'7.~ ,.z.~c~(-)¢D 00 .~ c) 1 .~, N 29 0 W 100 00 6282 54- 70 o 2.6.5 625:¢') .~;4 6184 42 N .... "-' :::,5 ....... ...................... :,.o:,4._ W 7002 67 N 27 .~,::: W (") ':..'~ 10000.00 59 30 lq 29 0 W 100.00 633:}. 48 7088.69 /:,281.48 6259.69 N :--::--:26.57 W 7088.71 N 27 59 W ,'}~ 2~ lO100_ ,00 .... .~'--.~ :z:O N ,_'.:"-}.0 W 10o.. 00 6:--:84.24 7174. .8:B /..v.z,.7.,_,._,._,~. .24- /.,::::z:~ .... ,0.5 N 3:--:68 . .'" ~'_-, ._, W. 7174 . :--:6,_ N 2:--: o. W o_. 0( 10200.00 59 45 N 29 0 W 100.¢)0 64:--:4.80 7261.09 6:_782.80 6,410..50 N :2:410. 17 W 72,'_-,!. 11 N 2:--: 1 W 0.2~ 10300.00 59 15 N 2'.? 0 W 100.00 /_-,4:--:5.55 7347.2:5: 64:3:2:. 55 6485. :--:6 N :_--:451. '74 W 7:347= 26 N 2:--: ! W 0.5( 10400.00 59 0 N 28 0 W 100.00 6536. :--:7 74:3:_::. ':2)6 6484. :_::7 6561.29 N 34'72. ?;0 W 743:3.09 N 28 2 W 0.87. 10~(')(') ¢)(') .~,'--/ (') N 28 (-) W 100 00 ='-"-' '~'-' .97 ""~-"-' ..... 6._,,:,,:,. 38 7518 77 - - 14 W / ..... - ..... a ..... -,/-,. :]:8 6636 N .: ..... :,.:,. 0600.00 5:B 4.5 N 29 0 W 100.00 6640.07 7604.37 6.5:-2:8. 07 6712.20 N 357:2.9'? W 7604.4 0700.0¢) 59 15 N 28 0 W 100.00 6691.57 7690.08 663'?.57 6787.53 N 3614.:77 W 76'70. 12 N 2'8 2 W 0.':": o:z:O0 0~') ~'~/ 1.5 N 28 (') W 100.00 6742 7(] 7776 ~')2 /-,/-,90. 70 686 .................... 09¢x]~.00 59 15 N 29 0 W 100.00 6793,83 7861,95 6741.83 6938.93 N 11000.00 59 15 N 29 0 W 100.o0 6844.?/_-, 7947.87 67?2.96 7014. 10 N 3737.'70 W 7?47.92 N '28 3 W 11100.00 5'7/ 0 N 2C-: 0 W 100.00 6:--:'.;/6.28 803.B. 70 6844.28 7089.5.3 N :--:778. :B/_-, W 8(')33.75 N 28 11200. Or) .................... .=,'-} 1.5 N 2',Z-.' tED W 100 00 6'747 .~'--~ '--' 11 '9 .~:--: 68'P5. ~'--~ 7165.31 N 381 '--~... 16 W 811 '~). 5:_--: N 28 3 W 11300.00 59 30 N 29 0 W 100.00 6998.5.3 8205.5:--: 6946.53 7240.9:5: N 3860.22 W 8205.6:---: N 2:--: 4 W 0.'.-'./( 11400.00 60 0 N 29 0 W 10(2).00 7048.91 :3291.94 6'79/_-,. 91 7:316.49 N 3'702. 10 W 8292.00 N 2:3 4 W 0.5( - -q 0 100, 00 7098,53 . -"-"--/'-'. 42 . ..,-. 0. 11500.00 60 ._0 N 29 W 8:B78.74 7046 53 /.:,;~ N 3944 19 W 8378.8! N 11600.0r) 6o 30 N 29 0 W 100.00 7147.77 ,:,46._,. 76 7095.77 7468.54 N 3'786 38 W ,:,4:,._ 83 N 28 ,_, W 0 0( 1170¢). 0o_ 60 1F] N 29 t'). W 100. c)o. _ 7197 .21 ,:,~'~='-'.a~,4.67714.5 .21 7~._,44 57 N 402::: ~5: W ,:~.'-'=~'-'_ ._,~. 75 N 28 6 W 11800.00 61 0 N 30 0 W 100.00 7246.26 8639.77 7~94.26 7620.41 N 4071.43 W 8~39.8 11900,00 61 0 N 31 0 W 100,00 7294,74 8727.14 7242,74 767/5,77 N 4~15,83 W 8727,2.5 N 28 8 W 0,8~ CONOCO, INC:. F'AD C MILNE F'OINT, NORTH SLOF'E, ALASKA SLOT : 1'.:.~ WELL : 1'~ PBHL : N 27 51 W DATE F'R I NTED : :--:0-,_1AN-86 OLIR REF. NO. : :_--;05487.7C0 ,_lOB NUMBER : PAGE NO. 6 MEASLIRED DRIFT DRIFT COURSE TRUE VERTICAL ~::UBSEA R E C T A N G U L A R C t_ 0 S LI R E DOGLEI DEPTH ANGLE DIRECTION LENGTH VERTICAL~'.:,EF'_.TIUN- TVD C A_ 0 R D I N A T E S DI~'.:,TAN~-'_.E DIRECTION SVRTY D M D M DEPTH D M 12000.0¢3 61 0 N 31 0 W 100.00 7343.22 8814.47 7271.22 7770.74 N 4160.87 W 8814.60 N 28 10 W 0.00 12100.00 61 30 N 32 0 W 100.00 7:_::'.-T/1.32 87/01. '.-76 733'.-.?. 32 7845.4'.~ N 4206.6:--: W 87~02.13 N 28 12 W 1.01 1212'~.00 61 30 N 32 0 W 29.00 7405.15 8'~/27.38 7353.15 7867.10 N 4220.18 W 8727.56 N 28 I3 W 0.00 12250.00 61 30 N 32 0 W 121.00 7462.8'.-.~ 7033.44 7410.8'.:./ 7'.:./57. 28 N 4276.53 W '.--./033. 66 N 2:--: 15 W 0.00 CLOSURE - DISTANCE : 9033.66 DIRECTION : N 28 15 W REPORT UNI TSFeet SURVEY CALCL1LATIE~N METHOD : Rsdius ,:,~: cur. v~tur, e SURVEY RUN INFORMATION GYRO MULTI-SHOT SURVEY (])-12100 MD, SURVEYOR: B ,_IAHN~ DATE RUN: 26-DEC-85 GYRO NO: 565/, CAMERA NO: 175~ '.:..'0 BEG A/U NO: 124::: RIG: NABORS 27-E dOB NO: 450-(:~24 NOTE: 12127/-12250 MD ARE PRO.JECTED ONLY CONOCO, INC. PAD C WELL: 19 SLOT:19 MILNE PT., NORTH SLOPE, ALASKA GMS, 0--12100 MD, SURVEYOR: B dAHN, DATE RUN: 26-DEC-85 FILE: 3051 REVOX FROM SPUDD RECORI] OF I NTERF'OLATED SURVEY ~ Eastn~n ~ :ONOCO, INC:. :'AD C IELL: 19 SLOT ~MARKER ....... CODE NAME ....... MEASURED DEPTH FEET KA KB KC KD LA 5187.00 5277.00 5363.00 545?.00 5529.00 LB MA MB MC NA 5587.00 5691.00 5803. O0 5941. CDC) 6153.00 NB NC ND NE NF 6177.00 6226.00 62/.,0.00 62'~5.00 6355.00 OA OB LCU Mkr. 19 T/KuP Iht 6408.00 /-,556.00 10753.00 10871.00 11180.00 T/MK- ! B/MK-i L-7 L-8 L-'.~ 11477.(>0 11478.00 11553.00 11561.00 11595.00 T/LK-1 B/lk-1 T/LK-2 B/LK-2 T/LK-3 117:38.00 11764.00 11780.00 11819.00 11867.00 TRUE VERTICAL DEPTH FEET 3756.08 :3804.88 · :,oF,.-~ 06 :3905. :30 :Z-: 94 4. :37 :3'.~76.80 4(>34.63 40'~6.30 4172.61 42?0. 4303.87 4331.37 4350.57 4370.33 44£>4.60 44:34. 4518.48 6718.67 677'.--.,'. 00 /_-, 937. :3:Z-: 7(>87.12 70'~ 7.54 7124./_-,:--': 712:E:. 57 7145.31 7215.84 7228.60 7236.45 7255.47 7278.74 SUBSEA VERTICAL DEPTH FEET 3704. 3752.88 380(>. 06 3:::53.30 3892.37 3'.~24.80 3982./.,3 4044.3£) 4120· 61 4238.4'.~ 4251. ,'5:7 4279.37 4278.57 4318.33 4352.60 4382.86 4466.48 6666.67 6727.00 7035. 12 7045.54 7072.63 7076.57 7093.31 7163. :34 7176.60 7184.45 720:3.47 722/.,. 74 COMPUTATION TIME DATE 0~:30:10 30-dAN-86 PAGE NO. i RECTANGULAR C 0 0 R D I N A T E S FEET CLOSURE D I STANCE D I RECT I ON FEET D M 2635.37 N 1500.48 W 2703.53 N 1533.21W 2768.62 N 1563.75 W 2841.02 N 1597.51W 2893.66 N 1622.05 W 2~37.24 N 1642.37 W 3015.30 N 167~.50 W 30~.37 N 1720.41W 3203.52 N 176~.07 W · ~-~c ..... ; ._, N 18:37..~'-'._, = W 3032.59 N 29 39 W 3108.02 N 27 33 W 317~.71 N 2~ 28 W 325?.36 N 29 21W 3317.28 N 29 1/-, W '-""/~ ';"R 29 ,~ · :,.~,=,-J.~.. N 1 3451.4~ N 29 7 W 3544.84 N 2~ 2 W 3/-,59.54 N 28 55 W 3834.77 N 28 38 W 3384.42 N 1844.81 W 3422.02 N 1860.01 W 3448.04 N 187(>.52 W 3474.8:3 N 18:--:1.34 W :Z-:520.:34 N 1900. 15 W · -~ i-i ~ m _ .. · :.,o._4 56 N 28 :--:/-. W 38?4.85 N 28 32 W 3'.-7~22.73 N 2,'---: 29 W · .=, .~;._, 1. 4 4 N ..-'~,,_,c, 2 6 W 4000.42 N 2:E: 22 W 3560.52 N 1'P16.:'--:6 W :3672.S.~2 N 1764.5'7 W 6827.74 N :36:36.27 W /.,'P 17.03 N :::6:::4. :::5 W 715(]). 16 N :3811. 1(]) W 404:_--:. 72 N 28 18 W 4165.:32 N 28 8 W 7735.67 N 28 2 W 7 8:::7.0 8 N 2:5: .3 I,,.I 8102.42 N ..c,,:,,_, ~ 7374.'P6 N :3S~34.51 W 7390. '.:.)0 N :3'.-34:3. 35 W 7432.77 N 3'F/6/.,.55 W 743:3.:-_-:6 N :3'.~6S~.?:3 W 74/.,4.74 N 3'.--~84.28 W .=.." ..... :,.85 N '-"-' ~ W 8377.08 N 28 5 W 8424.'P4 N 28 5 W 84:31. ?0 N 28 5 W 8461.4'.-} N 2,'-_-: 5 W 757:3.:39 N 4C)44.8:3 W 757:3.11 N 4055.S/'P W 7605.25 N 4062.:5:6 W 7634.7:--: N 4()77.87 W 7670.'.-7~1 N 4101. 1:3 W :~.=,:q 5 8 A N '---'8 /-, 14 :E:608.51 N 28 7 W 8622.45 N '2:5: 7 W 8656.47 N 28 7 W E:678.42 N 28 8 W :ONOCO, INC. 'AD C IELL: 17 SLOT: 19 MARKER ....... CODE NAME MEASURED DEPTH FEET B/LK-3 B/KuP Int PBTD TD 11874.00 11950.00 12129.00 12250.00 TRUE VERTICAL DEPTH FEET 7282.1:3 7318.98 7405.15 7462.89 SUBSEA VERTICAL DEPTH FEET 7230.13 7266.98 7353.15 7410.89 COMF'UTATION TIME DATE 09:30:10 30-dAN-86 PAGE NO. RECTANGULAR COORDINATES FEET 7676.18 N 4104.29 W 7733.26 N 4138.35 W 7867.11N 4220.19 W 7957.29 N 4276.54 W CLOSURE D I STANCE D I RECT I ON FEET D M 8704.5:3 N 28 8 W 8770.e3 N 28 9 W 8927.56 N 28 13 W 9033.67 N 28 15 W co,oco. PAD C WELL' 19.~, EASTHAN WHIPSTOCK. [NC. SLOT ' 1 9 'ORIZONTAL PROJECTION" SCALE 1 IN. = 1000 FEE! DEPTH INDICATOR, TVD FINAL STATION, DEPTH 12250 HD. 7462.89 TVD NORTH 7957.29 WEST 4276.54 CLOSURE 9033.67 N 28 15 19 W CONOCO. !NC. ....................... PAD C WELL' 1 9 i EASTMAN WHIPSTOCK:. INC. SLOT ' 1 9 VERTICAL PROJECTION SCALE 1 IN. = 2000 FEET _. _ 0 0 1000 I=-,,I 20O0 4000 6O00 2OOO 3000 4000 5000 6000 7000 8000 9O0O 10000 11000 8000 I I I 0 2000 4000 6000 VERTICAL SECTION I 800O I 1 0000 CLOSURE 9033.~67 N 28. 15 19 W Form to be inserted in each "Active" well folder to check for timely compliance with our regulations. OPERATOR, WELL NAME AND NUMBER Reports and Materials to be received by.. ~)R~e Required Date Received Remarks Completion Report ~~ ~ ___~...~ Z¢~. fl~ ,, Mud Log ._~. ~Core Chips Core Description , Registered Survey Plat Inclination Survey ...... - Directional Survey / Drill Stem Test Reports Production Test Reports ~ ,. Digitized Data , STATE OF ALASKA ALASKa' ' AND GAS CONSERVATION C MISSION SUNDRY 1. DRILLING WELL[] COMPLETEDWELL,~ OTHER 2. Name of Operator Conoco Inc. 3. Address 3201 C Street, Suite 200, Anchorage, Alaska 99503 4. Location of Well 1459' FSL, 2531' FEL, Sec. 10, T13N, RiOE, U.M. 5. Elevation in feet (indicate KB, DF, etc.) 59' KB Lease Designation and Serial No. ADL 47434 12. 7 Permit No. 85-296 S APl Number 5o-029-21504 9. Unit or Lease Name Milne Point Unit 10 Well Number C-19 1 1 F~eld and Pool Kuparuk River Fi eld Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubmg [] (Note Report multiple completions on Form 10-407 wltha submitted Form 10-407 for eachcomplet~on.) 13. Describe Proposed or Completed Operations (Clearly state ail pertinent details and give pertinent dates, including estimated date of startmg any proposed work, for Abandonment see 20 AAC 25.105-170). Approval is requested to allow Milne Point Unit C-19 Well to utilize the hi h-low pressure pilots and safety system lines in conjunction with the MPU C-3 Wel~. This is necessary to operate surface and subsurface safety valves while temporarily producing C-19 Alaska ()~I ~', 14. I hereby certify that the foregoing ~s true and corr.e~,t to the best of my knowledge. Cond,~onsof Approval ~f any. Aoproved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev 7-1-80 Submit "Intentions" ~n Triplicate and "Subsequent Reports" ~n Duplicate PERMANENT SAFETY SYSTEM INSTALLATION Flow Lin Surface Safety Valve Return Gas Pilot ~ Hi 'Lo Sensor ~ /-'~-I- Sub- sur face Safely Valve, -- :]l scssv '~7 B lock and ~porf ~Bleed Volves ~ I Drain to Cellar ,,,Gas Injection Line Hi-Lo Pilot Surface Safety Valve j, TEMPORARY NO TE : INSTALLATION % There are no additional valves in the flow or inject/on h'nes. Regulator I000 psi psi Flow Line JBleed Valves Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 February 12, 1986 State of Alaska Alaska Oil and Gas Conservation CommissJ_on 3001 Porcupine Drive Anchorage, Alaska 99503 Gentlemen: Sundry Notices and Report on Wells Attached for your approval are the original and one copy of the Sundry Notices to fracture stimulate the Mi]ne Point Unit Wells B-8, C-3, C-17, and C-19. Also please find the original and one copy of the Sundry Notice to sidetrack the MPU B-2] well. Please direct any questions to Lynn Alexander at %6A-7609. Very truly yours, Everett Do Wilson Divisi(m Administrative Manager LA/kss STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. Conoco ]:nc. 85-296 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage, Alaska 99503 5o-029-21504 4. Location of Well 1468' FSL, 2329' FEL, Sec. 10, T13N, R10E, U.M. 5. Ele~..a~i~n ~eet (indicate KB, DF, etc.) 12. I 6 . Lease Designation and Serial No. ADL 47434 9. Unit or Lease Name Milne Point Unit 10. Well Number C-19 1 1. Field and Pool Kuparuk River Field Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repmr Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note. Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A fracture stimulation treatment is proposed for the lower Kuparuk (2) formation to improve the relative permeability. The treatment will increase ultimate recovery from the lower Kuparuk (2) formation. The operation should take place in February or March. 14. I here~'~tify that the foregoing is true and correct to the best of my knowledge. The space below for Commission~ use Date ~-- It-~_~Co Conditions of Approval, if any. Approved Cc:~y Returned Approved by. By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" ~n Triplicate and "Subsequent Reports" ~n Duplicate Eastman (907) 349-4617 P. O. Box 4-1970~Anchorage, Alaska 99509-1970 Jan 26, 1985 William Van Alen Alaska Oil and Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Dear Mr. Van Alert Please find attached two copies o~\the Gyro Multi-Shot survey run for Conoco Inc. on P~~~ll No: 19 . This is to be considered ~~~%~tter of transmittal. The data herein, is to con~%f~~strictly confidential. A copy of this letter~t~~ sent to Conoco's represen- tatives, Mr M. Bradshaw~--~:'--Mr S. Davies. Should you have any questions regarding this survey data, please refer all questions to CONOCO INC. Dis~ Technical Coordinator cc: M. BRADSHAW S. DAVIES RECEIVED FEB 0 3 1986 Alaska Oil & Gas Cons. Commission Anchorage Directional Drillers/Sub-Surface Surveyors/instrument & Tool Rentals/Sales/Worldwide GE RHAi'YT GEARHART INDUSTRIES, INC CUSTOMER CONOCO , INC. FIELD We]] Name MPU C-19 County NORTH SLOPE Type of Logs Distributed DIL, CDL/CNS 'RAW,PORngTTY;W~T. Date Job Ran 12-14-85 . 12-24-85 Blue Line 1 ALASKA OIL AND GAS CONSERVAT I ON COMM I SS I ON Logs m~iled to: 50ol F'ORCUPINE DRIVE ANCHORAGE. ALASKA 97501 ATTN: WILLIAM VAN ALEN KUV RUK State ALASKA Date 1-23-85 Sepia Pre-Fold~Rolled____ CRRRff PRINTS MAILED FROM GEARHART H INDIISTRTRS DISTRIBUTED BY T~aa!E MOP. BECK 2" & 5" LOGS ARE COMBINED INTO ONE PRESENTATION 2"/100' TOP DEPTH TYPE ~ CDL/CNS RAW .35O0-qqq ~ --- CDL/CNS POROSITY 3500-ggq5 DIL 118-9995 BO'II'OM DEPTH 6759- 12170 6751-12170 6782-12170 5"/100' TYPE ~ 11500 11900 Please date and sign and return in the enclosed self-addressed envelope and return to Conoco. NO. OF LIS TAPES.~- ~ g,'~-/7~_ SIGNED AnchoFa[je ~' STATE OF ALASKA -'- ALASKA (.,L AND GAS CONSERVATION CO. MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drdling well [] Workover operaUon [] 2. Name of operator 7. Permit No. Conoco ]:nc. 85-296 3. Address 3201 "C" Street, Anchorage AK 99503 8 API Number ' 5o-029-21504 4. Location of Well at surface 1459' FSL, 2531FEL, Sec. 10, T13N, RIOE, U.M. 5. Elevation in feet (indicate KB, DF, etc ) 6. Lease Designation and Serial No 52' KB ADL 47434 9 Unit or Lease Name Milne Point Unit 10. Well No. C-19 11. F~eld and Pool Kuparuk River For the Month of, December ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spud Date: 12-10-85 Logging tool stuck 12-23-85. Workover fish w/overshot. Depth at end of month: 12,250' Footage drilled: 12,250' Took 15,000#,to push fish free 13 Casing or liner ru.n and quantities of cement, results of pressure tests Ran 169 jts. of 9-5/8" 36# K-55 csg. pumped 1850 sks. Permafrost G w/3% NaC1 and 10% CFR-2. Ran 312 jts. of 7" 26# L-80 BRTC csg. Class G w/2% CFR-2 and 0.3% Halad-24. E and 275 sks Class Cemented W ~7%'s k s 14 Coring resume and brief description None 15. Logs run and depth where run FDC-CNL-GR-Cal-DIL from 6786' MD to surface. GR-FNC-CNL-DIL-SP from 11,415' to 10,000' Complete GR-CCL-gyro RECEIVED Anchorage 16 DST data, perforating data, shows of H2S, miscellaneous data Perf using 5", 12 spf from 11,819' HI} to 11,800' and 11,800' to 11,780'. Select fire from 11,602' to 11,598', 11,578' to 11,561', 11,557' to 11,553', and 11,498' to 11,478'. 17. I hereby certify that the foregoing ~s true and correct to the best of my knowledge. S I G ~F~~'~~-~' ' ~~~'~'--"/~,¢/ TITLE Analyst DATE /-- ~'J '- ~'~::2_ NOT"~-Re~on this form is required for each calendar month, regardless of the status of operations, and must be f~led in duplicate w~th the Alaska Oil and Ga(C'Conservat~on Commission by the 15th of the succeeding month, unless otherwme directed. Fr~rm 1Fl-Z~R4 Submit ~n duollcate MEMORANnUM Stat of Alaska ALAStCA OIL ~O GAS CONSERVATION COld, MISSioN TO' C, V ./(~~ton DATE: FI LE NO.' December 30, 1985 {-~ TELEPHONENO.' D.EWS.61 THRU' Lonnie C. Smith' ,5 Commissioner SUBJECT: FROM- Edgar W. Sipple C__~~ Petroleum Inspector BOPE Test Conoco's MPU C-19 Pemit No. 85-296 Kuparuk River Field Saturday, December 14, 1985: I left ARCO's Kuparuk 3J-11, Rowan Rig ]4~"~sUbject ~of an0t~e~ report, to Conoco's C-19 to witness a BOPE test on Nabor's Rig 27E. Monday, December 16, 1985: The BOPE test commenced at 9:50 AM and WAS cOnClUded at 12:00 PM: There were no failures. I filled out the A.O.G.C.C. BOPE Inspection report which is attached to this report. In summary, I witnessed the BOPE test on Conoco's C-19, Nabors Rig 27E. Attachment 02-001 A ~ Rev I O&G #4 ~T''~ 5/a4 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report .Inspector ~-~/)~,,~,~ ~./, ~.~.~.~ Operator_ ~,w ~ ~.~ Location: Sec/~ Drillin~ Contractor Location, General _ General Housekeeping. ~ Rig Reserve Pit ~ ~ Mud Systems Visual Audio Trip Tank Pit Gauge Flow Monitor Gas Detectors T~/ R/b~ ~P~ Well Sign Pipe Rams Blind Rams~ Ch~ Line Valves H. C. R~ Valve Test Results: Failures -- ~ - Date / ~ -- //~ Well L~,. / ~ Representative Permit # ~-~ .~/f Casing Set Ri~ #~ Representative ~ ACC~LATOR SYST~ Full Charge Pressure ~ Pressure After Closure / Pump incr. clos. pres. 200 psig Full Charge Pressure Attained: Controls: Master ~4' Remote ~(~ Blinds switch cover psig, psig, lA o ~ rain /? sec. · / min. 3'~-sec. psig. Kelly and Floor Safety ~alves Upper KellM (P~ Test Pressure Lower Kelly ~9~ Test Pressure Ball Type ~ Test Pressure Inside BOP ~'~ Test Pressure Choke Manifold~/~' Test Pressure No. flanges ~ ~ Adjustable Chokes _~, ~U Hvdrauicallv operated choke f-/~ - ' Test Time ~9--hrs.../~ ~ z.~J~ · Repair or Replacement of failed equipment to be made within ~/~ 'd~ys and' Inspector/ Commission office notified.~ ~ Remarks: " - Distribution orig. - AO&GCC cc - Operator cc - Supervisor November 29, 1985 Mr. James R. Hanc~ Engineer Conoco Inc. 3201 C Street, Suite 200 Anchorage, Alaska 99503 Re: P~lne Point Unit C-19 Conoco Inc. Permit No. 85-296 Sur. Loc. 1468'FSL, 2329'FEL, Sec. 10, T13N, RiOE, Btmhole Loc. 10~4'FNL, 1275'FEL, Sec. 4, T131~, R10E, ~. Dear Mr. Hand: Enclosed is the approved application for permit to drill the above reference well. The permit to drill does not inde~-~nify you from the probable need to obtain additional permits required by law from other govern- mental agencies prior to commencing operations at the well site. To ai~ us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout pre- vention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter syste~ is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the s}~oe of the conductor pipe. V~r.{ tr~lw_~7ours, ~ C. V. C]~atterton Chairma- Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION be Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery (co c_ Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 November 2I, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Enclosed are the original and two copies of the Permit to Drill application for Milne Point C-19. A $100 check is being submitted with the permit application to fulfill the permitting fee requirement. If you have any questions, please call Jim Hand at 564-7640. Very truly yours, Rogers J. Francis Manager - Engineering JRH/w cc: MP C-19 Correpondence File STATE OF ALASKA ALASKA ~_ .,. AND GAS CONSERVATION CO, PERMIT TO DRILL 20 AAC 25.005 ...VllSSION SERVICE~E] S~:RATI MULTIPLE ZONE ~ 9. Unit or lease name la. Type of work. DRILL REDRILL DEEPEN 1 b. Type of well EXPLORATORY [] DEVELOPMENT OIL [] DEVELOPMENT GAS [] 2. Name of operator Conoco Inc. 3 Address 3201 "C" Street, Suite 200, Anchorage, AK. 99503 4. Location of well at surface 1468' FSL, 2329' FEL, Sec 10, T13N, RiOE, U.M. At top of proposed producing ~nterval 1520' FNL, 1050'FEL, Sec 4, T13N,RiOE, U.M. At total depth 1094' FNL, 1275' FEL, Sec 4, T13N, RiOE, U.M. 5. Elevation ~n feet (~ndicate KB, DF etc.) KB 50' to MSL 6. Lease designation and serIal no. ADL 47434 10. Well number C No. 19 11. F~eld and pool Kuparuk River 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number 8086-15-54 Amount $200,000.00 14. Distance to nearest property or lease line 15. D~stance to nearest drilling or completed well C-3 73 feet 13. D~stance and direction from nearest town 33 mi N-W of Deadhorse miles 1094' @ TD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 12250' MD 7485' TVD feet 2,560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 500 feet. MAXIMUM HOLE ANGLE 57.7Ol(see20AAC25.035 (c) (2) 21 Proposed Casing, Liner and Cementing Program 18. Approximate spud date 12/2/85 3±bb ps~g@~O~' Surface 3740 s~ @ 7485 ft TD (TVD) P g SIZE Weight 48 36 26 CASING AND LINER Grade Coupling H-40 PELP K-55 BTRS L-80 BTRS Hole Camng ~"1 ~ ~/8" 12~4 / 9 5/8" / 8½"I 7" 22. Describe proposed program: Length 80' SETTING DEPTH MD TOP TVD 6888' 35' I 35' I 35' I 35' 33' I 33' 12217' MD BOTTOM TVD 115' I 115' 6923' 4637' 12250' I 7485' I QUANTITY OF CEMENT (~ncludestagedata) ±100 cf Cmt ±1850 sks Perma "E" ±275 sksClass G ±350 sks Class G ±180 sks Perm Cmt Conoco Inc. proposes drilling the subject well as an injection well in the Kuparuk River field. The mud system will be low solids, non-dispersed with a minimum mud weight in surface hole of 9.0 ppg to a maximum of 9.8 ppg. Mud weight at T.D. will be 10.4 ppg. A 20", 2000 psi diverter will be installed on the 13 3/8" conductor for drilling surface hole. A 13 3/8", 5000 psi RSRRA BOPE stack will be used on the surface casing for the drilling of production hole. Pressure tests will be performed as per State Regulations. BOP's, choke manifold, Upper an Lower Kelly will be tested to 500 psig and 5000 psig, the Hydril to 350 psig and 3500 psig. Casing will be pressure tested to 1500 psig. Maximum downhole pressure is based on initial reservoir pressure. Maximum surfac~ pressure is based on an unexpanded gas bubble, temperature taken into account. The closest wellbore is C No. 3 which is 73' southwest of C-19 at surface. Arctic pack will be placed in the 7" × 9 5/8" annulus after disposin[ of test oil and excess drilling fluids. The well will be perforated and completed before releasing the drilling rig. It will be flow tested after the rig is released. 23. I hereby certify that the foregoing ~s true and correct to the best of my knowledge SIGNED ~ ---,, ~~- ~ TITLE Engineer The spac~elow for Commission use DATE November 21,1985 CONDITIONS OF APPROVAL Samples required Mud log required I~YES ~O []YES ~0 Permit number Approval date oO~qG/~'"') ,,~ 1~,/2,9/85 I Dir/~,~ctlonal Survey required I APl number ES E_~NO 50- ,P2~- ,~. I.%-O 4Z SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER by order of the Commms~on DATE November 29, 1985 Submit in triplicate SUPPLEMENTAL DATA SHEET APPLICATION FOR PERMIT TO DRILL Conoco et al - Milne Point No. C-19 Conoco Inc. 3201 "C" Street, Suite 200 Anchorage, Alaska 99503 I. CEMENTING PROGRAM me The 13 3/8" conductor will be set at 80' below the surface (115' K.B.), then cemented to the surface with permafrost cement. Be The 9 5/8" surface casing will be cemented with ±1850 sacks of permafrost "E" cement followed by ±275 sacks of Class "G" cement. A top job will be done if cement is not circulated to the surface. Ce The 7" production casing will be cemented in two stages. The first stage will consist of ±350 sacks of Class "G" cement pumped around the casing shoe (estimated ±1550' of annular cement, based on 100% excess over gauge hole). The secondary cement job will consist of ±180 sacks of permafrost type "C" cement followed by ~60 barrels of Arctic Pack pumped down the 7" X 9 5/8" annulus. II. ANTICIPATED GEOLOGY 0' - 4500' Surface conglomerates, clay, silt and sand sequences. Estimated base of permafrost at 1700'. 4500' - TD Predominantly shale until the Kuparuk Sands - expected at ~6985 subsea TVD. III. FORMATION EVALUATION me Wireline logs for 12 ¼" hole (from T.D. to surface conductor pipe) will include: Dual Induction log; Sperically Focused log; Litho Density log; Compensated Neutron log; Gamma Ray. Be Wireline logs for the 8~" hole (from T.D. to ±1000' above the Kuparuk interval) will include: Dual Induction log; Spheri- cally Focused log; Litho Density log; Compensated Neutron log - Gamma Ray. IV. DRILLING FLUIDS used from 0'-1000'. A low solids non-dispersed gel/water mud system will be u~ed from 1000'-Surf. Csg. Pt. Low solids lightly dispersed mud system 6900'-T.D. V. DIRECTION PROGRAM The C-19 well will be drilled to a proposed KOP of 500', then build angle in a north 27.9© west direction. The closest that the C-I9 will come to another wellbore is from surface to KOP, where the proposed C-19 will be 73' northeast of the existing C-3 well. After KOP these two wells will run parallel to each other, but will diverge with depth. C-19 will also run perpendicular to C-4 and pass over it within 97' at 1460' TVD. There are no other wells which come within 200' of C-19's proposed well path. An MWD tool is to be run while drilling for surveying purposes. Final hole angle will be 57.7°. The proposed depth is an estimate only.__If actual depth exceeds the permit depth by over 300', a Sundry Notice will be submitted. J. R. Hand Engineer QOQ. '* TMD'2807' DEP'106; Zoo ~VD=7i180~ TMD=11679 DEP;=B56 · :;;: I:: ,Ii!l-1 ,1 LZTVD-7485S_TMD~_l; 2250~DEi '''~ .... t .... t~f"t~''~'~-k'; ....... f:-~t- ........ t-,-~-~-t,- '~, '~F ' ~'~- .............. ~ ~ , ~' ' ' ~ ~' :~i ~~~VERTICAL, SECTION'~ :-9046 , I ' 21 96 --', .... · 1189 -I' 4527 ~-'~' 1~ 469 -- ~599 '_', ~ t i '"'-"~ ~--'+- "--~+-*-~--%'e '*- t~uu-1 - . ~ ---q 1 89 200 , ~.- -- ~ --'-"-"7-'-r 4217 2326-- '.2 ' : ';--'--'- ' 1-"~- ....... _.t --;_L , .00 200 N SIMF t LAGOON SCALE ~N ~S CONOCO MILNE POINT UNIT EXISTING STATE PLANE CO ORDINATES AI~E ?ONE. 4 ALL GEODETIC POSt TIO/~JS ARE BASED ON N A O. 19Z7 OFFSETS TO SECTION LINES ARE COMPUTED BASED ON PROTRACTED VALUES OF THE S~CTION CORNER POSITIONS 4 LC~ATED WITHIN SECT 10, T 13 N, RIOE , U.M., AK. C 13 LOCATION IN SECTION FR'O~$ LIN~ F~C)~ E UNE 1068' 496' J 954' J839' 724' C 16 J 610' C-17 j t287 C-19 J 1468 I PLANE CO-OROS. EASTINGS 558,255.76 558, 438.90 558, 292.56 GEODETIC LATITUDE 70~ 29' 2~ 894" 70° 29' 21.260" ?0°29' 25.768' 70°29' 24.639" N. 70°29' 23.502" N TO° 29'2Z.387"N POSITION LONGITUDE 149031. 25. 543" W. II -9 -85 11-10-85 N'ORTHINGS · 2205' 6, 029,351.58 2027' 6~ 028, 280.21 2169' 6 , 029,237.:39 2134' 6 ,029~ 12~ 2098' J 6 ,029,~7.~ 2063' J_~2 8~94.48 ~273 ~~569 69 . ~19' ~J_~, 719.772 / 558 ',~29.0 6 558 , 566.14 558~ 402.27 558_~t 185.84 · 558~ 248. 260 558, 128.09 70° 29'29. 044" 70° 29'20.680" 7(3° 29' 30.821" 149° 31'20.280" W 14 9° 31 ' 24.486 "~ 149°3 I' 23.438"W. 149°31' 2Z. 374"W. 149° 3,1'21.337" W. 149° 31' 27. 550" W, 149° 31'2§.909"W 149° 31' 29. 208" II -I -B5 J.H. 6.1, 8§ j &IRS. I1-1 -85 ~ . L 0. IELD BOOK 22 -85 22 - 85 22 - 85 46 - 85 46 - 85 CERTIFICATE OF SURVEYOR : ~-r4['HY CErTiFy THAT I AM P~OP£1qLY LOCArlo~ SU~V[~ ~DE ~Y ~E O~ ~V ~UPt.~VlSIO~I 'C' PA D BUILT WELL LOCATI 0~ CONOCO SCALE ' J SHEEr I ' · 400' J 2 0~: 2 C0,,,.a la £ N T ~ . CONOCO, INC. MILNE POINT UNIT DIVERTER STACK FOR 13 3/8'" CONDUCTOR i' FILL UP LINE ~ ~ FLOW LINE HCR VALVE 70" 9ELL NIPPLE £0" APl 2000 ~Ds~ ANNULAR PREVENTER ' , !L .-~----.---, t ~! I .Y'-4. I ) 6" 1.~ ~ RELIEF VALVE 01VERTER QUICK CONNECT ASSEMBLy . i . ~:OTE: SAVER SUB ASSEMBLY STARTING HEAD ~ ~" ' ' ~'-' ~' · 3/8 C,ASING '~:'$,~;A;'~ (¥.! ~., '¢, Relief lines from the drilling spool will be routed for do~m~lnd diversion. Hydraulic control system will be in accordance with API specifications and AOGCC regulations. Both HCR valves ~i11 open ~hen the preventer closes, then e~:her one may be closed. Depending on rig contracted, the two 6" relief lines may be replaced by a single lO" line with a downstream tee. CONOCO, INC. MILNE POINT UNIT BOP STACK FOR 13 3,"8" CONDUCTOR FILL-UP LINE FLOW LINE ANNULAR PREVENTER ID 3/8" APl 5000~- RAH BOP t3 '~/a" APt 5000 RAM BOP 13 3/,~ " APl 5OOO~ SPOOL ('¢~3' - APl 5000 SIDE OUTLETS APl 5000 RAM BOP Z" APl 5OOO~. TBG 31DE OUTL~' TS SPOOL x I1" APl 5000 (i) B.O.P. stack size ~atin~ meets AP1 RP 53 & spec 6A for class 5M with clamp & hub connectors all hvdraulically ooerated. (2) gOPE to be operated on each trip & pressure tested weekly. (3) Hydraulic control svstem for BOPE to include (5) station control manifold located remote with 160 gallon accumulator and reservoir unit and auxiliary enercy :;ource for system activation. Ram t!.'pe BOP to include a ~ninimum ,pr one set of blind r .... s and two approprzate pipe Fa~s . (5) Choke and kill man~fotds shown separateiv to meet AP1RP 53 class 5M requirements. 3' APl 5000''~ SIDE CUTLETS CSG SPOOL II" APl 5000 L FRO,~4 RE,~OT5 H~OH PRESSURE Pb'~P ,NOTE: I HYDRAULIC CC.'il'ROL S)'STENI FOR 80P ST~CK ~ C~.3KE WAN)FOLD TO iNCLUDE (5) Si'ATJC~ Cc:,rROL ~AhIFOLD LOCATED REk~OTELY WiTH ~SO0 PSi ACC~.NIULAFOR 8 160 GAL FES£A'¢OIR 8 ~UX EhERGY SOURCE ~5} STA GSNTROL I~',NIFOLD PLUS VARIABLE CHOKE CONTROL TO BE LOCATED CN RIG FLOOR. 2_ KILL ~ CHOKE' N~NIFOLDS TO NEEI' ,t'P1 RPS) CL. 5u STD$. :5 KILL t,I.a, NIFOLD SIZE- RATING 2' - 5000 4 CHOKE NANIFOLD SIZE-RATING ;l"- 5000 I FR$~ MUD PUN(P KILL ,,,~,,,ruLD H YDRAULIC -n, "o, lc ~E~OTE OPERATED CRiLLING SP~L HYDRAULIC CONTROLLED R~OTE OPIATED r~ ..... =c G~GE SE',ZCR CH$KE ~F~ ~(ANIFOLD ~,D~UST, A8! F CHOKE 1 BLEED LINE TO PIT TO ~TUOS?HFRIC ~UD/GAS SEPARATOR ---.- TO SHAIF SHAKER CHONE a KILL L(~NIFOLDS FOR clS/8'~ a 7" OD C~SING BOP STLC)< BOP ',iANIFOLD LAYOUT - CONOCO, INC. : CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE YES NO ( 1 ) Fee ff~( //-Z~-~ (2) Loc ~ //- 2g-~,5' (2 thru 8) (8) (3) Admin .~0~ //- 2~-Y~' . 9. (9 thru 12) 10. - -- --" 11. (10 and 12) 12. (13 thru 21) (22 thru 26) (6) Add:~d~//-~b '~,,5' 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 1. Is the permit fee attached ................................... ~ eeeeeee ~ 2. Is well to be located tn a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before ten-day wait .......................... Does operator have a bond in force .................................. ~k~_ Is a conservation order needed ........................... Is administrative approval needed ........... [ ....................... . ~p~_ Is the lease number appropriate ........ ~/~0K_... Is conductor string provided .................................. ...... ~ Is enough cement used to circulate on conductor and surface .... ~ Will cement tie in surface and intermediate or production st;i~s . i - Will cement cover all known productive horizons ................... Will surface casing protect fresh water zones .............. i .... Will all casing give adequate safety in collapse, tension and burst...~ Is this well to be kicked off from an existing wellbore ............. ~ .,, Is old wellbore abandonment procedure included on 10-403 ............ - Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... .~ Are necessary diagrams of diverter and BOP equipment attached ....... ~P Does BOPE have sufficient pressure rating - Test to c5-'~O psig .. ~f Does the choke manifold comply w/API RP-53 (Feb.78) .................. /f/f/ Is the presence of H2S gas probable ................................. Additional requirements ............................................. __ ~ Additional, Remarks: / / / REMARKS o H 0 Geology: k~fA --- JAL - EngiB~erin8: M~rM ,,,,'f~ HJH rev: 03113/85 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. DIRECT DIGITAL LOGGING' C'OPiPUTER PR'OCESSED ANALYSIS RECEIVED JAN 2 4-.19B6 ' · ., . . -. .. .4~L~1~1.8. %'.&'Gas Cons. Company CONOCO, INC, Well MILNE PO.INT UNIT' 0-19 RUN 1:12-14-85 Field KUPARUK .RUN .2: 12-24~85 County NORTH SLOPE .. St"atm ALASKA · Country uSA " CLIENT FOR-'MA:T' DA'TA LOG INFO'RMA.TI.O.N .. FORMAT ( L". I T'APE . STAN..DARD .s ) We.ll No,: CONOCO C19 Dapths: 57.00 to 12170,00 L Name: MILNE POINT UNIT C-19 Field: KUPARUK RUN' i': 12-i4-85. RUN 2:12-24-85 .... T-R P .E 'R E C.'o R D S .. Time: 1:27 PM MON. Pmgm: Set--\~ i ce F~ame: &GSF 01 Previou~ r~i: **** TAPE HEADER ****' Set. vice name: &GSF01 Previous tape: "HEADER Date: 86,"01/13 Origin: Commen.t~: . . RECORD"-"o Real.name: 3 05 02.2. Page Continuation #: Date Comment~ Origin: .. T~pe name: 305022 Continuation #: Ol File name: &GSFO1 ,00! .. .HEADER. RE'C.ORDS..' Maximum length: i024 'File %ype: LO Ver~ i on' ~ ... Pre.vi°u-~ $'i lc: Date: Pagm -'RECEIVED jAN ~ 4 · · MNEM CN WN FN COUN CTRY SECT TOWN RANG EK8 EDF EQL PD LMF DMF RUN LCC SON LUN FL LUL ENGI WITN DD DL TLI BLi TCS TLAB 8HT MRT MT MSS MVIS RM RMF MFST .MFSS RMC MCST MC:SS :. I'NFORMAT"ION "RECORDS CONTENTS .UH]T CONOCO, INC ................. MILNE POINT UNIT C-19 .RUN 1:t2-14-85 ' . ........... KUPARUK RUN 2: 12-24-85, ' ' , ..... NORTH SLOPE .......................... · .......... ALASKA .............. · ............... . ........ USA · t 3N ' lOE ' - 52,000 .................................................... 5I ,000 .................................................. ~ . i ,.", 800 ....... ' .......................................... MS ' ' ' I I I I I I I I I I I I I I I I I I I I I I I ! I I I I I I I I I I I 1 I I I I t I I I I I KB - i i t i i i I i I i i i KE~ i I i i i i i I i I i I i i I I I i i I I i I I i ] I I I i I ~ I I ~ I I I i I i 1. i j I I I j 30 ' i I I 305022 ................ 7612 NORTH sLoP~ ......... ;'', NORTH SLOPE , , HUPP DRVZES , , 6775,0 O O .............. 6786 , 000 .............. i 1~, 000 ................... 6782,000 ....................... 9,200 ......................... i5,i60 ........................ 90,000 .......... - , ~ ...... 90,000 ........................ SPUD .......... FLOWLZNE , ,. ........................ 42,000 ......................................... 4,990 .................................... ,, ,. 4,310 ............................. . ................ 4~,500 ...................... MEASURED '~ ' I I I I I I I I I I I I I I I I I I I I I I i I I I .I '1 I I I I I I I I I I I I I 4,880 ................................ - ........... · .... ~,, 52 400 ' i I I i i i i i i i i i J i i i I i i I i I .i I I ~ i I I ~ i ] I I i I i i i i ~ i i I .Ii , ~ I I I MEASURED .- · . . IIIIIIIl,llIIlillIli IllIIlIIIlIlI'IiIIi-ii.i tI.I.IIIIlI.IlIIIII IIIIIItIItlIIIIIIfII, ,l'll[lllii,.I,I IIIlIllIIlIlIl I'II'II II It .I It II II~iI HR DEGF DEGF 'CP 'OHMM OHMM DEGF OHMM DEGF TYPE .0 0 0 0 0 0 0 0 0 0 0 0 0 .0 .0' 0 0 0 0 0 0 O. 0 O' 0 0 0 0 0 0 0 .0 O' 0 0 '0 O' 0 _.HTu 0 o 0 0 0 0 0 0 0 .3 3 .3 0 0 0 0 0 0 0 0 .3 3 -3 .3 2 4 1 i 2 2 2 '2 2 2 2 2 · 2 - 2 SIZE 40 40 40 '20 20 2 .3 4 ''4 2 2 · i 0 iO · 20 2O 20 20 4 "4 .4 4 4 4 · 4 20 2'0 · 4 4 4 4 12 · 4 4 12 CODE 65 65 65 65 65 6,5 .65 65 6,5 68 68 65 65 65 .79 79 '6·5 65 65 6.5 6.5 6.9 .6.9 68 68 68 68 68 65 65 6,.9 68 68 65 68 65 Pagm' COMMENT' RECORDS : · · ~ This LIS tape ~a.z ~,,ritten bp Gearhart IndU~trie~ l~ireline 'Serv'ice~. ~ :~.:~ Ail curve and tool mnemonics used-are those 'w'hich most 'closelp match ~ ' :~ Qea~-P, apt curve and tool mnemonics. '~ ' ~EARHART TO SCHLUMBE'R~ER MHEM SERVICE UHIT DEPTH FEET TEN MERGE MV' SP MERGE API GR MERGE GAPi ILD MERGE OHMM ILM MERGE OHMM LLJ MERGE OHMM CILD COMPUTED MMHO MNEM Ifil DEpT 'TEN SP ILD ILM CILD SERVICE UNI? FT MERGE. MERGE API. MERGE. 'GAPI "MERGE OHNM MERGE OHMM MERGE OHMM COMPUT MMHO Paga DATA ENTRY :+::~:.~m ENTRY 8LOCK LEGEND ~:+:~- TYPE C,E'.i.~CR I P T I ON 0 Terminator ( no more entries ) FORMAT sPECIFICATIONS . TYPE SIZE' CODE 66' ..Page SERVICE S MNEM i D O DEPT TEN MERGE SP MERGE · ER MERGE ILD MERGE ILM MERGE LL3 MERGE C i LD COMPUT DATA FORMA'T IFICATION 8LOCK~ **** · ERVICE APl APl' APl API' RDER # UNIT LOG TYPE CLASS MOD 05022 FT 0 0 05 022 MV 0 .O 05 022 AP i 0 i O 05 022 GAP i '0 54 05 022 OHMM 0 i 20 05022 OHMM 0 120 05 022 OHMM 0 22.0 05022 MMHO 0 68 0 .i 46 44 6 4.6 .0 .0 0 0 0 '0 '0 0 · . .SP.EC I-F I.CA T IONS FILE .# PRC. '# SIZE LVL SMP'L RC 4 0 4 0 4 0 4. 0 4 0 4, 0 4 0 4- 0 l- 68 i 68 i 6.8 :-i 68 .' i ' 68 i - 68 i 68 i '68 PROCESS INDICATORS 000'000 .00.0000'000000 0'00000 ~0'000.0 000000 000000 .O-O0000. 000000 000000 000000 000000 000.000 .0.0000'0 000000 00.0000 '000'00'0 000000 000000 000000 000000 000000 :000000 000.000 page .. DEPT TEN SP DATA GR' REC'ORDS iLD ILM LL3 CILD Page . 6790.500 6690,500 6590,500 6490.500 6390,5.00 6290,500 619.0,500 6090,500 5990,500 5890,5O0 5790,500 5690,500 55.90,500 5490,500 5390,500 5290.500 2283,000 2967.000 3098.00o 3006. 000 3098. 000 2932,000 2962,000 3001,000 2962,000 2542, 000 2630.000 2737, 000 2503,000 2337. 000 2591,000 26J0,000 0.000 89,500 73.400 63.000 GT,lO0 54,000 43,i.00 57,800 66.000 44,500 56,600 86,300 35.900 87, 1.00 37.300 32,6'00 O. 0-00 94,8.00 G9.3:00. 93,8:00 l.O! "0.00 72,900 65 ,'600 76.6'00 67,600 39, 1.00 5t, 1.00 85,6'0'0 46,.000 65.3~00 . 35.200' 28,7-00 .:. i . 000 3', 707 5, o2 77.6 4,150" 3,899 - ., 4';808 6,039 1", 98'2 1 .G75 2.000 '4,217 '2 ..223 2,500 1~694 1~710 3 .' 664 4,887 3.698 3,936 3,540 4.487 5.495 084' 644 2, '004 4.111 2,360 .2,655 i ,828 i. ,849 i . 00-0 : 4,3i5 5. 834 . 4,477 ' .4,529 4,40'6 .5. :309 6. 067 4 ~ 94,3 · 4. 53 -5. '000 '§ .260' 6,3.39 ' '4.416 5. 129 6.08.1 10'00.000 26-9.774 .199.067' 264,850 24'0,991 256,448 207,970 165.577 504,661 . . 597,035 500,034 .237,-137 449.780 590,201 584,790 DEPT TEN SP DA GR TA R E C O.R D $ .' ILD ILM LL"3' CILD. Pag~ 5i 90,-,~00 ,,090,500 4990.500 489.'0,500 479.0,500 4690,500 459'0,500 4490,500 4390.500 4290,500 4190.500 4090,500 3990,500 3890,500 3790,500 3690 , ..., (~ 0 2308, 000 2454, O0 0 2230, 000 2342. 000 2220,000 2249,000 2269, O00 2137. 000 21 ..7,2,000 2093,000 20'2.'5. 000 2i 13,000 90.8,000 927,000 1790,000 1712,000 46,100 67,300 83,200 81,800 54.400 45,600 24.800 56,500 66,6'00 67,000 56,400 44,900 45,500 37.500 45,400 45,8...00 54.8'00. 68 6.0'0 80,5.00 · .. 62,700 52,6'00 .. 50,1 .:00 2'0,0.00 79,600 72,900 53.500 69.500 54'i:00 7'.00 49, 57' 0..00 3.04i . · 4,63,4 3,8il 4 ,..732 5.420 5'598 7, 145 .. 17,78.3 .5,521 .S" i 2.9 9,099 5.72 9,81.7 t .i . 58'8 ."~ .. 3.a a .3,266 4,753 3 .'6.~,s 4.61.3 5, .070 5,224 '7 .--031 15'812 4.898 4..498 '590 5.~o '9,247 9,311 i I, 482 8.83i 7.656 6,.442 '4. 966 '4.,989 5,808 6.28i 8.!66 1'.9.5Se 5,224 4.989 9..572 9,5'2.8 .. . i 0,9.9'0 8 630 328,852 215.77'5 2.62.422 2t.i.349 184. 501 178,649' 139.959 56.2.'34 t81. i34 194,984 i 09,901 160,3'25 1 04. 472 lol ,e5.9 86,298 1 07.152 -. DEPT TEN SP GR TR .RECORDS 'I'LD- · I'LM LL3 CILD t0 3590,500 ~4.0,500 2~9 0.5 0 0 3290,500 3190,500 500 2990. 500 2890.500 2790,500 -,690,500 2.590,500 249'0,5 0 0 239'0,500 2290,500 21'90,500 2090,500 834,000 1678,000 1634,000 542, 000 498. 000 1556,000 1620,000 I556.000 1678,000 1620,000 1498, 000 1527,000 1478,000 1439,000 1644,000 1556,000 49,800 41 ,600 3i.iO0 40,900 21 ,900 12,700 36,100 4o.5oo 45,600 38,800 4?,200 59,900 25,300 45,500 29,300 49,800 76.7.00 34,8..00 66,0.00 64'7.'00 60,6.00 53,3.00 52,3;0.0 33.7'00 3'8,6,00 60,200 51,5.oO 43,8-00.., 38, 1:00 · - 51 , '1.00 50.600 '9, :772 I 0 ,'47 I' I 1, '246 1'2,417 11,194 il,482 12,853 8.95.4 .. 8.974 0,257 e. 8].0 7,534 7,031 8.750 .. 9,840 9,750 0.280 I 0,'304- 11.,668 9 '931' . . 11,015 1.1,'7'76 8,511 9;705 · .8.166. 6,871 6,295' 8,035 9,226 8.356 8.954 1i,246 9 ~ 099 10.304 8.,954 1 0.23.3 1 i, 0. i5 10. 046 1.0 0~ . 1.0,162 9. ?9'5 9.311 8,630- 10.423 1 02. ,329 95.499 98.40i. 88.920 80,538 8° 331 87,096 77' 804 111,430 97,499. · I 42,233 .114., ~_° 88 101,625 DEPT TEN DR GR TR :RECORDS · ILO ILH LL3' CI LD ' 'Pag~ ii i990.500 1890.500 1790.500 i576. 000 1507. 000 1400,000 68.900 58,800 54.400 68.i'00 49,t.00 57. i-00 7. 925 t2,417 6,88? 11 , 104 l . ?.9o?. 8.147 11.194 9,2.47 i'26.t83 '80. 538 i19,124 1690,500 1590,500 1490,500 1390,500 1290,500 1190,500 090,500 990,500 890,500 790,500 b~O,500 59'0,500 490,500 1400,000 141 O, 000 1293,000 1215. 000 1263,000 1224,000 1132,0.00 1107,000 068,000 1 O1 O, 000 1 01 O. 000 927,000 873,000 41,200 49,600 39 ,.90'0 26,100 26,400 17,600 38,20.0 26,100 71 .700 83, 1'00 73.700 34,500 29,900 59,5.00 e?.oOo 72,4'00 .. 65,500 54,000 69,9'00. 61 , 300 60.4:00 42,8:00 41,9.00 56.,700 27.900 60,5.'00 · . 2.9., 512 10. 965 · . .. 22', 43.9 .54,954 54'075 84.1'40' 1.8.664 218,'-273 36'475 5.2oO 96.828 ? 62.1 .. 19.275 9'099 17.539 20.230. . . 37.931 29.785 . . '3'0,1-3 O' 9.93i 55.-335' 16. 069. '3,041' .. 22.803' 4.345 .. 1.5'382 9.66'1 15,2.41 17.742 33,497 .. 22.08'0 448,746 283 79'2 663,-743 381,944 205-t16 '5.03'.50.0 268.534 · 9i ' 20.i 44.566 28. 907 18..t97 1'8. 493 11.885 53.580 ..4,5:31 27.416 192". 309 10.328 131. 220 'RECEIVED JAN 2 4' ]986 Oil & 'Gas Cons. ~,'naission'. DEPT TEN SP ~R TA RECORDS ILD ILM LLD 'C. ILD ' · Page 390,500 ~90,500 190,500 90,500 854,000 814. 000 736,000 775.000 2,9'00 7,300 50, 1 O0 22,800 36, ?0'0 45.i00 55,30'0 17,4.00 90i ,572 i241.6.52 I01 .391 J O000O. 020 i i8.577 ,. i 03.514 . 28.379 5,420 9i.~.22i 860.994 744.,731' i ,i09 , ,9'05 .-010 FILE TRAILER File name: ~GSFOI,O0! TRA I L.ER'.. RECORDS' Maximum length: 1024 File type: LO Verzion.~: · Next ~ile: Date: Page ~.** EOF *** File name: &~SFOi o00'2 HEADER. RECO'RD'S Ma×imum leng~.h: 1024 File type: LO 'Version Previou~ Date: Pm.gm 1'4 CN WN FN COUN STAT CTRV SECT T 0 W t,l RANG 'EKB EDF Et~L PD LMF D M F RUN LCC SON LUN FL LUL ENQi Wi TN DL TLI BLI TCS TLA8 8HT MRT MT MSS MViS RM hlFST MFSS Ri'lC MCST MCSS I NFO'RMA T I O-N' R'ECORDS CONTENTS UNIT CONOCO, INC ............... · . MILNE POINT UNIT C-19 RUN 1: 12-14-85 ........... ~,',,',. KUPARUK RUN 2: 12~24-85,.,,;', .......... NORTH SLOPE ........................ ~ .......... ALASKA ........... - ........................ USA · 4 I i I I I I I i I i i i r i I r i i i I I · I t I I i i' t. i ii I. I i I I i i 'l I · II iOE ............................................. · .....',, , 52,000 ................................................. ., 51 , 000 .......................................... ~ ....... i7.000 ......................... MS,,,,,,,,,,,,,,,,,,,,,,,,,,,, K~, ....... , , , , , , , ~ , , ,, , , , .... , , K~,,,,,, I, ,, ,,,, ,, .... ,,,, ,~,, , ilIIlIIIIIlIIIlIIIIIIlIlIIllIl 30~,~*J,,,,~,~,,,~;,,,,~,~ 305022 ...................... 7612 · SLOP~ .................... NORTH ................................ · .... NORTH SLOPE IIlIlIIIIlIIIllIIIIIIII.IIlIIIIltlIlI HUPP ' ' ' · IIillI. IliIIllllIlllItiIllliIll DAVIES ......................... ' ...... 6775,000 .............................. , ...... ',.,- .......... . 6786,000 ........................... ' ...... .,- .............. ifS, IllIIlIlIIIIlIIi~lIIII IIIIIIl]lltllliIllltlll lllIIII,IIlIIIIIII.IIlII, IIlI IIIllltIIII~,I"IIII ilIiiIl,,IllllIIlil.,l.lllI . FT FT FT FT ,FT 000 ' ' ' FT | i .FT HR" HR DEGF DEGF CP ,OHMM IOHMM DIE~F OHMM. DEaF 67@2,000 .......................................... 9. 200 ......... ,' ............................. ' ....... - 1 5 I 1 6 0 ............................................. 90,000 ......... 90 , CIO0 ............................. '' SPUD ........... ? .................. FLOWLINE ............ - .......... . ..... :,,, 42,000 .............................................. ~,990 ........................ · ............... .,. ...... 4,310 .................................. · .... :'. ........ 4:9,500 ........................... '~-, ........... ', ;'.,. ,. .... MEASURED l 52. 400 ..................... . ...... · ............. - ......... MEASURED ................. .TYPE 0 0 0 0 0 I0 0 0 0 0' 0 0 0 0 0 0 0 0 0 0 .0 O. 0 0 0 0 0 0 0 0 ''0 0 0 0 0 0 0 0 0 0 CATG 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 i 1' 4-0 40' 40 20 20 20 2 3 4 4 4 '2 2 2' 2 2 10 JO 20 20 20 20 4 · 4 · 4 ' .4 4 4 4. 4' 2'0 2'0 '4 4 4 4 i2. 4 4 12 CODE· 65 65 65 65 68 48 65 65 65 '179 79 '65 65 65 68 ,58 68 68 ·68 '68 65 6,5 68 68 · . P'a'gm .. COMMENT RECORDS · · Thi~ LIS tape was ~,r. itten by G'earhar-t tndust~-ie~ gire!in¢ All Curve and tool mnemonic~ used are ~earhart curve and tool mnemonics. · GEARHART TO SCHLUMBERGER. MNEM SERVICE 'UNIT MNEM SERVICE UNIT DEPTH FEET TEN! MERGE MV GR1 MERGE GAPI XCAL1 MERGE INCH FFDC1 MERGE CPS NFDC1 MERGE CPS RHOBi MERGE G?C3 DRHO! MERGE G/C3 FCNLI MERGE CPS HCMLI MERGE CPS CDLI COMPUTED PU NPHS! COMPUTED SSP'U RATI COMPUTED DEPT TEN GR CALl FFDC NFDC RHOB DRH'O FCNL NCNL DPHI NPHS NRAT MERGE MERGE . MERGE MERGE MERGE ,MERGE MERGE MERGE" MERGE COMPUT COMPUT CONPUT 'FT MV' G'API IN ..CPS CPS "G?C3 G?CJ CPS. -. CPS PU PU page DATA' · -~m m~ ENTRY BLOCKS ENTRY FORMA TYPE T SP'EC I F'I CAT I.ONS SIZE'' CODE Pm.gm l? =~:~mm ENTRY 8LOCK LEGEND TYPE DESCRIPTION 0 Terminator ( no more entries ) FORMAT DATUM SPECIFiCATiON BLOCKS ***~ SERVICE SERVICE API MNEM iD ORDER # UNIT LOG API API APl TYPE CLASS HOB BEPT 305022 FT TEN MERGE J05022 MV 0 GR MERGE 305022 GAPI · CALl MERGE ~05.822 iN 0 FFDC MERGE 305022 CPS 0 NFDC MERGE ~05022 CPS 0 RHOB MERGE J05022 6/03 0 DRHO hiERGE ~ 05 022 ~/C3 O FCNL MERGE 305022 CPS 0 NCNL MERGE 305022 CPS 0 DPHI C:OMPUT 305022 PU NPH9 COHPUT J05022 PU 0 NRAT COMPUT J05022 0 0 0 .0 0 0 0 54 I '0 24 i3 0 98 2 '0 98 i '0 ' 94 i 0 i :.00 i 0 78 3i .0 78 30 0 0 0 0 i 22 2 .0 . . SPE'C I F I CA T 10'NS FILE # PRC '# SiZE LVL-SMPL 4 4 4 4. .4 4 4 4 4' 4 4 4 4. . 1 .i i 1 1 1 1 i 1 RC 68 68 68' 68 '68 · PROCESS iNDICATORS' 000000 .Oooo00 000000 000000 00000.0 000000 · 000000 0.00000 000000 000000 '00.0000 000000 000000 00000.0 000000 000000 000000 000000 000000 000000 0000.00 '000000 00000'0 000000 000000 '0000.0.0 000000 00'0000 00.000'0 000000 00.0000 00000'0. 000000 000000 00'0000' 000000 000000 '000000 000000 'P'ag~ DEPT FCNL TEN NC NL DPHI 2200,000 64,000 1566.000 185,500 65.400 32,606 21'00,000 70,400 1498,000 204.400 48,200 32.485 2000,000 57,700 190O,O00 64..000 180O,O00 58.700 1700,000 58,300 1576,000 t66,000 1400,000 191.700 1478,000 185.700 1342,000 178.300 68,200 36,909 48,300 35,333 / 61,000 35,212 50,00'0 36,424 D A'T A ' R'E C.O'R D Sm . ' CALt 'FFDC- NPHS NRAT. '12,650 59'0,000 45,770 2.96.3 NFDC .RHOe . . . 526.1 O0 2. i 12' 12,590 623/400 39.9i 0 2. 840 522.600 2, 1 i4' 13.270. 734.700. 45,370 -' 2.95i" ., 565.800 .. '2. 12,s9o' 64s,ioo 3~,.21o .2,s3s : 12,740 · 6~6.400 40 ..720 ''m 2 ' 8'1 3 .531.500' - .. .. 560.200 .. 2' 0'67 '2. 069 15,330 42-, 5'00. 698 ,.? 0'0 2.. 967' 551,1'08 2. 049 DRHO. Page -. 040 -, 023 -, 046 -.018 -'. '0..'36 II I mi . ;. ' · · ::' !.III ~.~ FiLE TRAILER ~ Film name: &GSF01.002 Maximum length :.~-~ -~ -~ EOF Servicm name: File type: .LO TRAILE'RRECORDS. Versi on #: Next ~ile: Pagm File name: &Q5F01.003 Maximum length: ~' 1024 ~HEADER. RE.CO. RDS Sepvice name: File.type: LO .. Version PreviOu~ ~ile: Date: . Page" 2i MNEM CN WN FN C 0 U N CTRY SECT T 0 W N RANG EK8 EDF EGL PD LMF DMF RUN LCO SON LUN FL LUL ENGI W I TN DL TLI BLI TCS TLA8 8HT MRT MT MV1S RM .RblF MFST MFSS RMC MCST MCSS · . I NFORMA T I ON RECORDS CONTENTS UNIT CONOCO, INC MILNE POINT UNIT C-19 RUN,i: 12-:t4-85 ......... · ........ KuPRRUK RUN 2: 12-24-85 ..... · ......... '. NORTH SLOPE - - - ALASKA .................................... USA ' 04 ' . . I I I I I i i I I i I I I i I I I I I I I i I I I I I ] I I I .I I i I I I I I iJN ................. · IOE ' ·IIIIIlIIIIlIIIIIlI,IlIIlIIIIltI,~ 52 I 0 0 0 i7.000 ................................ NS ' IllIIIllllllIllIlIIIlIIlIIlll·lll~l K~ .................................. .. , mm~mmmmm~mmmmmm~mm~m~.'m~m.mm~m ~OSO~ ........................ NORTH SLOPE ' ' ' NORTH SLOPE HUPP · IiIi IIlI iIIIlll DAVIES ............... 6??5,000 ...................... - ..... 6786,000 ilS,000 ........................ . 6?82,000 ................ · ........ 9,200 ............................... i5 160 · I IIIilIIIIIlIIIIIlIIIIIIIIlIIlII ~0,000 90,000 .................. SPUD FLOWLINE 42,000 ................ 4,990 .................. 4.~10 ................. 48,500 ................. MEASURED ............ 4,880 52,400 .................... MEASURED IlIlIlfll IIlIlIl'll llll.lllI · lllli·i'll IIII11111 IIIiiiiii IlIIIIIII illll·ll I III|II|l| II..~IIlIII lid|Ifil· IIlIlIIlI IIlIIllII lllilIIl' tl/,IIl& IIIlII'II t I I I I I I '~ . . I . I . I.l.lI I.iii. . I'.1 I'111 I . . ~1 Il.L· I II t I. II ilIII '1 II II IIIIIII I'1 l.lIIIi II I-iIIIll . IIIIIlIIll .. l.lll'i.l'lll ~1.111,$'11 ~i.iIil'iII Ii,'l.i. iIli iIliiiflI .1. IIIii 1.1|111 1.1111.11 II!1111 'ilfl' ..11. I iii. IIII I11. .1111 I I . I . ii I F.T FT F.T FT FT FT FT HR HR DEGF DEGF CP OHMM. . . OHMM DEGF OHMM DEGF TYPE CA'TO O. 0 0 0 0 0 0 0 0 0 0 0 O' 0 0 0 '0 0 0 .0 · 0 23 0 0 0 0 0 O. 0 0 0 '0 0 0 0 0 0 0 '0 0 0 0 0 2. 0.. '4. 0 0 0 ~ . 0 2 O' 2 O. 0 '0 0 O' 0 40 4O 4O 20 " 20 20 2 .3 4 4 4 2 -2 2 2 2 i'0 10' 20 2O 2O 20. 4 4 4 '4 4 4 4 4 20 20 4 4 4 4 .~2 4 4 12 CODE 65 65 65 ~5 65 68 68 68 65 65 79 79 65 65 '65 . 65 68 ~8 68 68 6,8 .68 68 68 65 68 '68 ~S8 22 COMMENT RECORDS Thi~ LIS tape wax wpittmn bp Gearhart. Indu~trim~ Wirmline Smrv'ica~, All curvm and tool mnmmonicz u~md arm tho~m which mo~t. clo~mly ·match Gmat. hart rurvm and tool mnmmonicz~ . . GEARHART TO SCHLUMBERGER -.~ ~NEM SERVICE UNIT NNE~ SERVICE uNIT " DEPTH TEN2 GR2 XCAL2 FFDC2 NFDC2 RH082 D'RH02 FCNL.2 NCNL2 CDL2 NPHS2 RAT2 FEET MERGE MV MERGE GAPI MERGE INCH MERGE CPS MERGE CPS MERGE G/C3 MERGE G?C~ MERGE CPS MERGE CPS COMPUTED PU COMPUTED 'SSPU COMPUTED OEPT TEN .GR CAL'I FFOC NFDC RHOB DRHO FCNL NCNL DPHI NPHS NRAT 'MERGE. MERGE MERGE MERGE MERGE MERGE MERGE MERGE' MERGE COMPUT'. COMPUT COMPUT FT MY GAPI IN. CpS. cps G?C3 G?C3 'cPs .. CPS "PU pU 23' DATA ENTRY BLOCK:_~ mm** ENTRY · ENTRY BLOCK LEGEND TYPE DESCRIPTION 0 Terminator ( no morm mntrimz ) FORMAT SP'EC I F I CAT I' ONS TYPE SIZE CODE. Pagm DATA FiORMAT SERVICE SERVICE MNE~ iD ORDER # APl API API AP1 FILE· UNIT LOG TYPE CLASS MOD # .. DEPT 305022 TEN MERGE 3050~ GR MERGE 305022. CAL~ MERGE 305022 FFDC. MERGE 305022 NFDC MERGE 305022 RHOB MERGE 305022 DRHO MERGE 305022 FCNL MERGE 305022 NCNL MERGE 305022 DPHI COMPUT 305022 NPHS COMPUT 305~22 NEAT COMPUT 305022 FT 0 0 NV 0 0 GRPI 0 54 IN 0 24 CPS 0 90 CPS 0 98 G/C3 0 94 G?C3 0 1.0.0 CPS 0 CPS 0 78 'PU 0 0 PU 0 122 0 0 0 J 1.3 2 1 J 3J 30 0 2 O- 0 '0 0 0 O' ~0 0 0 0 .0 '0 0 S. PEC. IF.I CATIONS 0 .2 '2 2 2 2 2 2 2 '2 2 2 2 p'Rc SIZE LVL 4 0 4 0 4 .0 4 0 4 0 4 0 4 0 4 O. 4 4 0· 4 0 4 0 4 0 # SMPL RC 1' 1. t 1" 1 1 .1' 8 6,9 68 6,9 6,8 68 pROCESS INDICATORS 000000 000000 000000 00'0000 00000-0 000000 000-000 0000'00 000000 000000 000000. 000000 000000 00000'0 000000 000000 00000.0 000000 00.0000.00,0000'.00000'0 000000 000000:-00000.0 00000.0 .000'0'0'0'000000 000000 0'00000 000000 000000 .000000 000000 00'0000 00-000.0 000000 000.000 000000 0000'00 Page '25 . DEPT TEN 'GR FCNL NCNL BPNi 6790,500 2283.000 O. 000 0,000 O. 000 i60,606 .. DATA CALl HPH9 o. o.oO 9. -RECORDS FFDC HRAT 0.000 -999.. 250 6690,500 2967,000 94,800 .11 ,,360- 520. 700' 73,900 20,3,200' 19,333 40,72.0 2. 662 6590,500 3098. 000 69,300 )J,090 74, J O0 189 , i O0 ~.o7. 273. 4i. i'90 6490,500 3006,000 93,800 13,660 75 . 200 206, SO0 i 5,2i 2 34. 840 559,00.0 2.6'8'4 41'9,'0'00' 2,536.. 6390,500 3098, 000 I Oi ,'00'0 14,,350 4.,7,2,500 70,300 i 91 , 1 O0 i 7,333 3,6,880 2,60i b~90,500 2932 000 72 900 1.3 780 72.000 207,400 15,333 38.,770 6190,500 2962,000 65.60'0 13,530 80,600 218,000 25.5.76 35,85-0 6090.500 3001 . 000 76,600 13.6.30 77 , 400 208. SO0 16. 849 36.'720 5990,500 2962.000 67,600 12,980 78,300 215;300 28,545 39,350 5890,500 2542,0'00 39,100 13,1'00 78,300 215,400 28.,727 39,720 5790,500 2630,000 51 , 100 13,520 78.400 214,800 23,455 4.0, 150 5690,500 2?37, 000 85,600 1'4,070 75,700 202, 100 25,2i2 39. 050 449,500 2,666 543,800 · .2' 602 452. 700 2. 632 '. 572 60.0 2,630 54'0,900 '2,67,1 · . 515.,.000 2,722 493,300 :2,707 NF'OC RH'O8 DRHO 0,.000 '0,000 60'9 'I O0 2.33'1 5-70,900' '2-200 525,400 · 53'5.800 2,39'9 2,364 s3?...S'oo 2,397 549]90-0 2,22e 558,3'00 2,372 562.500 2 ,.1 79 -. 53.1 .800. S53.700 2,176. 2,263, 540,400 2 2.34 0,000 .023 ,028 .. ,017 030 ,007 .048 .002 -', 01.:3 ,018. .001- Paga DEPT FCNL TEN NC )-IL GR DPHi DA CALl T'A R'ECORD -FFDC -NEAT· NFDC RHOB :DRHO Page 5590,50.0 8'0,000 5490,500 76,000 5390,500 5290°500 91.300 2503,000 215.700 2337.000 207,300 2591,000 221.200 2GlO,O00 233,600 46,000 37,030 ,55,300 25.212 35,2'00 35,394. 28,700 34,i21 ]2.760 4~ 12,740 39.230 12.670 36.670 o' 672 524.400 67'2,800 2.595 G40,400 2.54i 559 .'3'00 552.500 .. 562,608 546;400 · . 2,0.39 2.2'34 2, '06G · · 2. 087 -'. 032 , '0'0G -, 020 -..02.5 5190,500 75.700 5090,500 73,600 4990,500 70,900 2308, 000 2i I .500 2454,0 0 0 2i4,700 2230,000 189,300 45,800 36.727 54.800 31 .57G 68,600 28,242 13.11.0 40'2.90 150 40,5i0 13,580 41 ,.240 '680.9'00 2,709 649.,80'0 2,792 599.400 2.,674 548.500. 561. ,900 2, 044' ..' 2.i29' 2.184 -, 037 -, 009 023 4890,500 60,200 4790,500 64,800 4690 , ._,00 80,400 4590,500 88. 000 4490,500 41.900 2342,000 188,i00 2220,000 196,700 2249,000 2i0.700 2269,000 228,200 2137.00.0 144.500 80,500 28.970 62.700 31.27.3 52,600 32.90'9 50, 1 O0 33,03 0 20,000 80.364 13,410 42,16'0 t3,310 40,8'0'0 39.720 12.760 ',T, 4,2 1.0 13,6-00. G7.390 603,400 · 2. 920' 623 300. 2,784 62.9,700 2,68G · . 657.700 .2.512 204.0.900 3.372 · .. 588.500 556.400 572,100 661 80'0 · 2,172 2,134' 2.107 · , '2. 1 05 .. I ,.324 · 035 .. -,-008 -,013 . .004 -, 098 DA T A R E CORD S' DEPT TEN GR ~CA.L 1 FFDC NFDc FC:NL NCNL DPH i NPHS HP,.~T.. ~390.500 2132. 000 52.700 i~9.,500 3i.09i "RHOB ' · DRHO Page 28 13,650 654,600 590..3.00 2 . 137 . 022 . - 5i. 040 3; I i5 4290. 500 209.3, 000 72,900 i 3,960 696,400· 55,000 173,600 32,606 51.560 :3.20;3. 4190,500 2025,000 53,500 71.400 206,500 36,182 4090,500 211.3. 000 69.500 61 ..500 189,000 3i .5i5 .- 13., 22·0 39,860 13,5:00 44.270 7i6,90.0 ' 2., 76.6 3930. 500 1908,000 54, I O0 '12', 920 77. 700 229,600 35,394 3.5. 940 · 631 , 300' · 2. 962 -600.40-0 2. i 12 · . 052 4.. 'o O.o 2,61'0 3890,500 1927.000 55,700 13,040 676.~ 900 74, 1 O0 214. 400 :34,909 3',9,660 '2,743 571 .300 2. 053 -', 021 -. 3790,500 1790,000 49,800 12,61 '0 689,400 80,000 22.5,200 :37. 455 40,0·60 -2,724 3690,500 1712.000 57,000 13,040 73, .300 194. 400 :34,970 40, :300 573;900 2,130 ,01'4 3590,500 ! 834. 000 76,700' 61 , 500 194,500 27, 030 .551 · 900 2.,-'066 · -. O28 . .. 56.5. '6 00 .2 ,'074 2. 032 -,010 -, 043 14 270 45 9.80- · 6 7.1 , 5 00 .2,711 .. 576. 700 3. 020 560., 400' '2. 073 .~?e. :~'oo' 2,204 · . 009' .. .04'2 File name: &GSF01.003 Maximum length: I024 File type: LO ~:?:** EOF *** 'TRAILER .. RECOR Yep'-=_. i on -# .' -Next ~ile: Datm, Page 29 :~:~** FILE HEADER **** File naiT~e: &G5F01 , 004 .. .HEADER'RECORDS Maximum length: 1024 File tppe: LO -¥¢pzi.on .#: Previous ~ile: Date:· Page MNEM CN W N FN C O U N oTAT CTRY SECT TOWN RANG EK8 EDF EGL LMF DMF RUN LCC SON LUN FL LUL ENGi WITN DD DL TL! BLi TCS TLAB BHT MRT MT MSS MVIS RM RMF MFST MFSS' MCST MCSS I NFORMA T I'ON -RECOR.DS CONTENTS -. UN.IT CONOCO, INC ............ '...' MILNE POINT UNIT C-19 RUN 1: 12-"14-'851~i ' . ....... KUPARUK RUN 2: 12-24-85 ...... ,,' ..... ',.,, NORTH SLOPE .......... ,,. ........ ~ ................ ALASKA ' USA ' 4IlIIIIIIIlIIIlIIIlIIIltIlIIIIlIIIIlIlII'IllIiII'I'lI. IIIII 13N ..................................................... JOE ......................................... ~...: .... 52.000 ................... 51.000 ................... i7.000 ................ ~8 ....... ~ ........... fIIII I,III IilII ~IllIII 7611,, ........... NORTH SLOPE ....... NORTH SLOPE ...... HUPP/OLSON ...... SENDA ...... i2250,000 ................. 0 '000 9995,000 ....... ' i2i?O,O'O0 ................. 16,500 ..................... 4,000 ..................... 168,000 ................... 168,000 ................... DISPERSED ~TER .... FLOWLIHE ..... 2@, 000 ...... ' .......... 4,200 .................. ~,740 .............. 58,000 ............. NEASURED ....... ~,660 .............. 58,0.0.0 .............. NEASURED ........ III III I · Iii m lmm ill i Iil iii!11111 lIIiIIiII .IIl,~IfIImI~I. IIIIlIIll.IllIII IIIIIIIIIAIt'IIJIIII'I..IiII. IlIlIIIlIIltlII'IliIl. llI'l IIIIlII~I.IIIIIIIlIl~'I~II IIiII'IIIl.lIIIIl·~lllIiII. iiii '11 [IIllltllIll.] llllIll{IlIl~llI·IIlIlllI1 IIIIIl~IIl. Ill Il IIIIlIlll'.IIIIllIlII'l'Ill~ I*IIII'II.'IIlII.I. IllIl''iII l IImlItIll I·tmIImII IIIIIItII IlIlIllII IlltllI'II ·lllllItll I.'IIlIIIIl~III IIlIIIl.lllII llllllIllI.llIl 'FT -FT FT F'T FT FT FT HR 'HR DEGF CP OHMM' OHMM DECF OHMM DEQF ..TY'PE O. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I0 I0 0 0 0 0 0 0 0 0 0l 0 0 0" .0 0 '0 0 0 0 0 0 0 '0 0 CnTG O. 0 0 0 0 0 0 0 l 0 3 0 0 0 0 0 O' ' 0 0 2 4. " 1 1 2' 2_' '2 '2 2 2' .2' · . SIZE 40 ··40 40 20 20 .20 4 4 '2 2 2 '2 .2 1-0 10 20 2'0 20 20 4 '4 '4 4 4 .4 -4 20 2'0 4 4 4 .4 12. 4 4 12 CODE I I 6 5 65 65 65 65 '6.5 65 65 68 68' 65 65 65 79 79 65 65 65 .65 65 65 68 68' 68 .65 6'5 .68 6@ '68 65 Page .COMMENT REC'OR.D$ .. ** This LIS taPe was written by .Gearhart Indus.tries Wiraline ** Ail cur. v.m and tool mnmmonics usmd arm thosm Which mo'~t closmly match ** ** ~ar-hmr-t curv~ and tool mnemonics, GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT DEPTH FEET 2GR~ MERGE GAPI 2XCALJ MERGE INCH 2ILD3 MERGE OHMM 2ILM3 MERGE .OHMM 2LL33 MERGE OHMM 2FFDC3 MERGE CPS 2NFDC3 MERGE CPS 2RHOB3 MERGE G?C3 2DRH03 MERGE G/C3 2FCNL3 MERGE CPS 2NCNL3 MERGE CPS 2RAT3 COMPUTED 2CILD3 COMPUTED MMHO 2CDL~ COMPUTED PU 2NPHS3 COMPUTED SSPU MNEM SERVICE DEPT GR CAL1 ILD ILM LL3 'FFDC NFD'C RHOB DRHO FCNL NCNL NRAT GILD DPHI NPHS MERGE MERGE MERGE MERGE MERGE · MERGE . MERGE MERGE MERGE' MERGE MERGE· COMPUT .. CO.MPUT COMPUT COMPUT UNIT FT. GAPI' .·IN OHMM OHMM' OHMM 'c s- CPS' .G?C3 C.PS CPS MMHO PU PU Page 32 DA TA :~.~ ~:~ ENT~.Y BLOCKS ENTRY ENTRY BLOCK LEGEND TYPE DESCRIPTION Terminator ( no more entriez ) FORMAT .TYPE' SIZE .SPEC I FI. CA CODE 0 t 66 TIONS Page .. DATA FORMAT DATUM SPECIFICATION BLOCk'.S **** SERVICE SERVICE 'MNEM ID ORDER # API API API AP.I UNIT LOG TYPE CLASS MOD DEPT ~0502~ FT 0 0 GR MERGE ~050P_~ GAPI 0 54 CALl MERGE ~050~2 IN 0 24 iLD MERGE ~050~ OHMM O i~O LL3 MERGE 3 ~50/22 OHMM 0 22.0 FFDC MERGE 30~22 CPS 0 98 NF~C MERGE 3~~ CP~ 0 -~ RHOB MERGE ' 0~22 G/C3 0 94 DRHO MERGE OS~ G/CZ O i.O0 FCNL MERGE ~.O~SO~i~.O CPS ...T COM.U o .o DPHI OOMPUT 7/05' 0~2 PU 0 0 NPHS CO,PUT 02~ PU 0 12.2 0 i 13 .46 44 2 1 1 .I 31 · 30 '. .0 46 . 2 0 ! 1. 1 I '.~' 1 '1 1 'i i. 1 i 'i 1 .. SP'E C I F I..C'A T I .O.HS · . FILE #- 0 '3 · ~ · PRC #' SIZE. LVL SMPL 4 4 .4 4 4 4 4. 4 4 4 .4 4 4 .4 4 4 RC' · i' 68' i 68' 'i '68 -.i 6,8 I 68 · i 6,8' i 68 i "6.8 i' 68 i 6e i. .68 - i 68 1 6.8 i 6,9 i 68 PROCESS iND -000000 0000 000000 0000 00'0000 '00'00 00000'0' 0000 000000 '0000 000000 0000 000000 0000 000000 0000 000000 0.0..0.0 -00'0000. 00'00 000000 .0000 000.000. 0'000 000000.'0000 000~00 0000 000000 0000 00000'0 0000 iOATORS' O0..O0000O 00. 000000 00. 000000 O0 000000 00' 000000 00'.000000 O0m 0000.00" O0 000000 O0 000000 O0 000000. O0 000000 00. 000000 O0 000000 0.0 000000 O0 000000 O0 00.0000 Page .34 D£PT RHOB DRHO C~LI FCNL 1'1418,500 0o000 0,000 0,000 O, 0'00 0.000 11318.500 2,393 88,400 ,047 5.110 i85.8'00 '11218.500 2.396 000 059 5.180 ' 90.40.0 1111.8.500 2.343 90.600 .026 5. 020 143,6'00 11018.500 2,265 104.700 ,016 4.570 130.000 10918.500 2,452 65,500 ,044 4,380 i54,500 I 0818,500 2,380 90,500 ,040 4,550 147,600 10718,500 ' 2,.300 124, 000 .044 4,97'0' 149.4'00. 10618,500 2.385 126.400 .011 4,550 170,30.0 1 0518.500 2.341 116.100 ,048 4. 720 i71 ,300 I 0418,500 2.3:39 1 09,400 ,014 4,700 i60.300 1 0318,500 2,354 95,400 ,049 4.710 i95.600 'DATA I'LD HCNL . .' 1..0'00 · 0,000 2,323 230,8,00 2,780 239.6'00 2. 128 194, 0.00 2. o.18 19.0.9-0-0 .. 2,-042 211 . S'O0 2,716 208,000 RECORDS I.LH NEAT LL3 CiLD 1 ' .000. --999,250' 2.. 223 1', 297 '2., 6'67 · i ,347 2' ·046 i ,465 I. 95.4 .1 ' 564 '1 .,. 991 I ,436 2,63'0 '1.47.0 I ,000 i 000,..0'00 2,818 - . 43'0,527 2,904 359,749' .. -2,.541 469,894 .. 2,570 495,4'5'0 489 ,.779 '2 ,.944 · .368. i 29 3,350 2'05,50 O 2,636'. 22.6,100 · 2.588. '227,7-00 1. 694 .2i5,700 266 ;465 :2 .. 58.8 :1 .405 '2,636 1 ,441 '1.671 '1 , 451 3,532 298,538 3, ··09 O. 379 ;'31S 3,25.8 386,367 2,.323 590,20i i . 71 0 255,300 1 '. 687 'i ,350 .2,382'. 584,790 FFDC DP..Hi NFDC NPN8' ' 0.000. 160,60'6 0.000 3.i88 386,9'00 i5.576- 398,70.0 15,394 418'. 50'-0 18' 606 470 ,.400 39' 53 O. 484,500. 42,300 476.00.0 48.460 '481.800 23.33'3 476.800 52,830 279.700- 12,000. 393.8.0..0 16,364 45'6. 1'00 21 ,2'12 376 ~ 800 16,06'1 414',800 i8,727 387,5'00. 1 '8, .849 439 ,. 2'0:0' i 7,939 .. · . 440,600 45.920 461 48.6'4 0 489,900 4'8,120 451,700 45.080 474,700 47,050 452,300 47,950 .'.. 498.300 42.170 Page DEPT F,'NOB i 0218.500 2,407 10118,500 2,410 10018.500 2,385 DRHO 70,500 CRL1 FCNL 4.610 · DATR ILD NC:NL ' 2.,051 260,2'00 RECORDS...' iLM NRAT LL'3 CiLD 2. 061 i ,314 · .2 ."535 487.5'29 FFDC DPHi 359,600 14.727 .NFDc NPHS 4.55,900 40.220 80,400 .023 86,400 .035 4,610 2.03.800 4,670 22 i. 4 O.O 4.457 252. i 0.0 266 3.0 0 4.775 i .2@4 3.266 i.24.9 3,214 224.388 3,451 3'06, 196 366. 14,545 . . '381.1 O0 i 6.06'1 457.000 38.51-0 4a5,. '4 0 0 3'~S. 580 Pagm. 36 :.~:~ m ~ FILE TRAILER ~ File name: ~GSFO1,004 Servicm name:. TRA'I'L.E.R RECORDS' Maximum length: 1024 File type: LO . . Ver. z i °'n ~#.: NeXt f'ile: Date: Page EOF *:~:~ File r, am~: &GSF01 . 005 Mmximum l~ngth: ~02~ H EA'D E R -R'E C'O R.D S Fii~ typ~: LO Vmrsion-~: Previouz ~ile: 'Page 38 bin EM CN WN FN COUN STAT CTRY SECT TOWN RANG EK8 EDF EQL PD LMF DMF RUN LCC SON LUN FL LUL ENGI WITN DD DL TLI TCS TLA8 BNT HRT MT. HSS H¥iS RM RHF HFST MFSS RMC MCST MCSS I NFO'RMA. T I ON RECORDS C:OHTENTS UNIT· CONOCO., INC, MILHE POINT UNIT C-19- RUN KUPARUK RUN 2 NORTH SLOPE ' .. ALASKA .... USA .... i~N .............. ., i0E ..................... ., 52, OOO -, ................. ~='1 000 K~, , ,, ,, , ,,', , , ~ , ,, ,, ~, ,, ~ , KB ' II I I I II i I I I I I I I II I I I I I I I I I i i I I ~ I I i I JI I I ii I I I I i I II I I I I I I I I I 'I I I t I I I I 7611 ......................... NORTH SLOP~ ................ NORTH SLOPE ............... HUPP/OLSON .......... , ..... BENDA ................ 12250 000 I I I I I t I .I I I I I I ! i I I I I I I 0 000 · I j J I J I j J i I I I I I I i I I J I I i J I J I J I I I J I. i2170 000 · i.6 500 · 4 000 · ' 168. 0 0 0 ............................. 168 , 00 O ................................ DISPERSED ~RTER FLOWL I NE 38,000 ....... 4. 200 ........ 3,740 58,000 ....... MEASURED . 3,66~ ........ 58, O00 ......... MEASURED , . 12 14 8'5' . ·l'llmflllIIIIIII 12 24 85'" · m~mr·~m'mm'~· i.'IIIlIttI'l'IIlI I II-IIlI. IlIII I"I'ltllII'IlIIII I IllIII·IIIt IIII. II. IItl. lI'·I · alii ·l(.'IIlIIIl·lll i iii tI{.IIlllllll'II' . I·1 . ·II IIIIil·ii· .III. -. IiiIIlllIiI I'IlI·IIJ.lII·l J IIIlillJIl·ll Ii · i·.II·l·l, llt,· i.i IImitIIlJiilI IgImllmII. IlII IIIlIIIIl'tlll . IIIIIIIIIIIII . IIl'IlllIIIlI! IIlI-IIlIIIII IIlIIilIlIIllIIl'·lII'II.lII'lIIIlII .. I IIlIlII I ·II'l.lllIlIlllIt'l. IItlI'lI.I_ . . · IIIIIII t IIIlllI'IIIIIlIIII-IIlIIII I ·lIlllI I IIIlIIllI lIIlIIlIll . .- IIIllIIlI I ItIIiIIl·I·lIIl. llIllIIil tIIIIiI#l I IllIIIl. IIIIIIlllIllItl.II . FT FT' FT FT FT FT FT HR HR DEGF DEGF CP' OHMM OHMM DEGF OHMM DEGF. TYPE CATG 0 0 0 '0 0 0 0 0 0 "0 0 0 0 0 0 0 0 0 0 3 0 3 0 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 0 '3 0 3 0 3 0 0 2 0 4 · 0 i 0 2 0 2 0 2. 0 2- 0 2.' 0 0': 2 0 2 0 2. SIZE 40 40 40 20 2'0 20 '2 3 4 .4 4 2 '~.~ 2 2 I0 10 20 20 20 4 4 4 '4 4 4 4 4 20 20 4 4 .4 4 12 4 '4 12 "CODE 65 68 ~8 6'8 65 79 79 65 65 '68 68 68 68 '68 65 65' 6.8 '68 ~8 68 68 Page' COMMENT RECORDS .' · ~ Thi~ LIS tape wa~ written by Gearhart"Indu~.tri'es Wir.eline Services.. ~$ ~ All curve and tool mnemonics u~ed are those which mo~t.ciosel~ match ~m :~ Gearhart curve and tool mnemonics, ~ GEARHART MNEM SERVICE UNIT DEPTH FEET 2GR4 MERGE GAPI 2XCAL4 MERGE INCH 2ILD4 MERGE OHMM ~ILM4 MERGE OHMM ~LL34 MERGE OHMM 2FFDC4 MERGE CPS 2NFDC4 MERGE CPS 2RH084 MERGE G?C3 2DRH04 MERGE G?C3 2FCNL4 MERGE CPS 2NCNL4 MERGE CPS 2RAT4 COMPUTED 2CILD4 COMPUTED MMHO 2CDL4 COMPUTED PU 2NPHS4 COMPUTED SSPU TO SCHLUMBERGER. MNEM .SERVICE..UNIT DEPT .CRL1 IL'D ILM LLJ FFD.C 'NFDC RHOB DRHO FC'NL HC L NRAT CILD DPHI NPHS MERGE MERGE .MERGE MERGE 'MERGE MERGE MERGE MERGE MERGE MERGE. MERGE coMPuT 'COMPUT COMpUT COMPUT FT. GAPI IN OHMM OHMM. OH. MM "CPS CPS G/C3 CPS--. CPS MMHO PU PU Page 40 DATA · :~m:~ ENTRY 8LOCKS mmm~ E N T R'Y 1IliIllJIIlJIfIlIIlIIlIIlIIIIIl|I :+::~.m:~. ENTRY 8LOCK LEGEND mmmm TYPE DESCRIPTION 0 Terminator ( no more mntrie~ ) FORM'AT TYPE SIZE 0 i SPEC. I..F'-I C A T I.-ONS .. CODE Page. 4i RECEIVED Oil & Gaa ~na. CommisslO~ .anchOrage . DATA FORMAT SERVICE SERVICE MNEM i D ORDER DEPT GR CAi_i iLl..', iLM LL3 FF'DC NFDC RHO8 DRHO FCNL NCNL NRA T CILD. DPH I NPHS MERGE MERGE 3.~_~ MERGE MERGE 30 '022 F1ERGE 30 '22 MEP, GE ....'" blERGE COM~UT C:OMPUT COMPUT COMPUT 02~ APl AP! APl AP1 UNiT LOG TYPE CLASS MOD FT 0 0 GAPi 0 54 IN 0 24 OHMM 0 12 0 OHMM 0 12'0 OHMM 0 220 CPS. 0 98 CPS 0 98 G,.'CJ 0 94 G,:C3 0 i 0'0 CPS 0 78 CPS 0 78 0 -0 MMHO 0 68 PU 0 .0 PU 0 i 22 0 i i3 44 6 2 i 1 1 0 0 2. '0 i i i i 1 i i 1 '1 I i '1 1 I i .SPECIFICATIONS FILE # · PR.C ~ SiZE LVL SMPL pROCESS iNDiCATORS 0 4 4 4 4 4 4 4 4 -4 4 4 4 4 4 4 . 4 4 4 4 4 4 4 4 4 4 4 4 4 4. i 1 .i i I 1 i i i 1 --~ i i 1 1 i. 68 G8 . G8 68 68 68 .68 G8 68 G8 · 68 68 000.000 00.0000 000000.' 00'0000 00-0000 O0'OOO0 00.0000 000000 000000 000000 '000000 000000 000000 00000.0 00'0000 000000 000000 '000.000'.000000 000000. '000000 000000 000000 000000 000000 0000.00 00.000.0 000000 00.000.0 O-Q0000 0000-00 000.000 000000 000000'000000 000000 000000 000000 00.0000 000000 000000 0'00000 000000 000000 0'00000 000000 0000-00- 000000 · .t Pagm 42 DEPT I'2HO~ GR DRHO CALl FCNL ~'2170. 000 0,000 0,000 0.000 0,000 0,000 J 2070, 000 2.3:39 300 .20J ~.180 20,5,500 2.j72 ?~,I00 .170 11870,000 29,500 ,014 ILO NCNL J 17'70,000 2,4.05 58.400 I, 0.00 '0.0.'00 1 J ~70,000 2., :360 61 .400 .011 0'55 ' .@00 1 i 570, 000 2.490 47,700 -,OOJ 'RECORDS · . 1470, 000 2,438 88,70O ,031 .NFDC -. 1,-000 1,'00-0. · 0..000 ' '0'000 -999.250 100.0 '000'. 'i60.606 3.i8.8 '" 4,634 2,944 512,500' 622.000 ... ,1.263 246.G04 15,8113 37.8i0 ·. 5,350 4,699 5,395 477,-000 i56,100 201,600 i,394 16,849 .. 15,205. 366,8.00 31 O, 200" 3-00 17.140 349,500 4, 027 23.13. 400 4,310 354,200 5,230 2136,200 · 4,570 292,500 4,980 362.700 .. 3,491 212 '13i4 45,920 i, 087 . _ 20.324 '1'146 8,954 1,1.32. 1.9,32 0 · 1.04J 15.631 527,3'0.0 .6'5..766 : 2.8.J21 57.544 1.4,1349 4,875'' . 381',50'0 J22.i8.0'' 17,576 .. 8 , 65 0 297 .. 70.0 58,345. '9,697 4,111 1.325 -. 2,636 248,313 334,6.00 1'2,849 4,880. 188,50.0 Page 566.100 44,4130 489,500 29,.i30 471.600 .31..700 458,100. 30,840 .. .. 41' , ?oO 26,5oo 457.500 43 File name: &GSFOl,005 TRAILER RECORDS'. · Maximum length: 1.024 Film typm: LO ---- Yet. zion Next ~ilm: Date: Page