Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
221-017
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, January 27, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. MT7-04 GMTU MT7-04 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/27/2025 MT7-04 50-103-20829-00-00 221-017-0 G SPT 8331 2210170 2083 2180 2182 2181 2181 220 340 320 320 4YRTST P Sully Sullivan 12/29/2024 Tested to 3000psi for 500psi dp 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:GMTU MT7-04 Inspection Date: Tubing OA Packer Depth 875 3080 3032 3023IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS241230132043 BBL Pumped:3 BBL Returned:3 Monday, January 27, 2025 Page 1 of 1 9 9 9 9 9 9 99 999 99 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.01.27 11:03:24 -09'00' Transmittal #1304 Detail Date: 5/2/2022 To (External Party): From (CPAI Contact): Email*: meredith.guhl@alaska.gov Email*: richard.e.elgarico@conocophillips.com First Name*: Meredith First Name*: Ricky Last Name*: Guhl Last Name*: Elgarico Phone Number:(907) 793-1235 Phone Number: (907) 265-6580 Company: AOGCC Company: ConocoPhillips Address: 333 W. 7th Ave. Address: 700 G Street City: Anchorage City: Anchorage State: AK State: Alaska Zip Code: 99501 Zip Code: 99501 Transmittal Info Sent Via: ShareFile Tracking #: Justification: Compliance Data Detail Quantity*: Description*: Type*: 1 CD5-93 Sonic TOC LAS, PDF 1 MT7-01 Sonic TOC LAS, PDF 1 MT7-03 Sonic TOC LAS, PDF 1 MT7-04 Sonic TOC LAS, PDF 1 MT7-05 Sonic TOC LAS, PDF 1 MT7-09 Sonic TOC LAS, PDF 1 MT7-96 Sonic TOC LAS, PDF Attachments: Received By: ___________________________ Signature: ___________________________ Date: _________________ Approver: ___________________________ Signature: ___________________________ Date: _________________ MT7-04 Sonic TOC PTD:221-017 T36546 Kayla Junke Digitally signed by Kayla Junke Date: 2022.05.03 08:58:23 -08'00' MT7 PHONE : 907-670-4739 PHONE : 907-670-4739 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, March 9, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. MT7-04 GMTU MT7-04 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv ________ Comm ________ MT7-04 50-103-20829-00-00 221-017-0 W SPT 8331 2210170 2083 216 217 217 217 30 53 54 39 INITAL P Brian Bixby 2/6/2022 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:GMTU MT7-04 Inspection Date: Tubing OA Packer Depth 880 2390 2350 2340IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB220208081220 BBL Pumped:1.9 BBL Returned:1.9 Wednesday, March 9, 2022 Page 1 of 1 9 99 99 9 9 -%5 2/6/2022 James B. Regg Digitally signed by James B. Regg Date: 2022.03.09 16:38:52 -09'00' Transmittal #1302 Detail Date: 4/11/2022 To (External Party): From (CPAI Contact): Email*: meredith.guhl@alaska.gov Email*: Richard.E.Elgarico@conocophillips.com First Name*: Meredith First Name*: Ricky Last Name*: Guhl Last Name*: Elgarico Phone Number:(907) 793-1235 Phone Number: (907) 265-6580 Company: AOGCC Company: ConocoPhillips Address: 333 W. 7th Ave. Address: 700 G Street City: Anchorage City: Anchorage State: AK State: AK Zip Code: 99501 Zip Code: 99501 Transmittal Info Sent Via: ShareFile Tracking #: Justification: Data Detail Quantity*: Description*: Type*: 1 MT7-04 SonicScope Top of Cement LAS, PDF Attachments: Received By: ___________________________ Signature: ___________________________ Date: _________________ Approver: ___________________________ Signature: ___________________________ Date: _________________ 221-017 T36467 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.04.11 14:28:30 -08'00' DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20829-00-00Well Name/No. GMTU MT7-04Completion StatusWAGINCompletion Date6/4/2021Permit to Drill2210170Operator ConocoPhillips Alaska, Inc.MD23605TVD8445Current StatusWAGIN1/31/2022UICYesWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, ACOUSTIC, NMR, NBI, SONIC, mudlogsNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleDF8/23/2021110 23606 Electronic Data Set, Filename: CPAI_MT7-04_FE_COMPOSITE_MEM.las35518EDDigital DataDF8/23/2021################Electronic Data Set, Filename: MT7-04_AP_TIME_MEM_RUN01.las35518EDDigital DataDF8/23/2021################Electronic Data Set, Filename: MT7-04_AP_TIME_MEM_RUN02.las35518EDDigital DataDF8/23/2021################Electronic Data Set, Filename: MT7-04_AP_TIME_MEM_RUN03.las35518EDDigital DataDF8/23/2021################Electronic Data Set, Filename: MT7-04_AP_TIME_MEM_RUN04.las35518EDDigital DataDF8/23/202111810 23600 Electronic Data Set, Filename: 6.5in_CPAI_MT7-04_MTK_LMR110_5MD_run3&4_RA16.las35518EDDigital DataDF8/23/202162 3300 Electronic Data Set, Filename: CPAI_MT7-04_SDTK_DTC_DTS_Run_01.las35518EDDigital DataDF8/23/20213380 11751 Electronic Data Set, Filename: CPAI_MT7_04_SDTK_DTC_DTS_RUN2.las35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_AP_TIME_MEM_RUN01.ASC35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_AP_TIME_MEM_RUN02.ASC35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_AP_TIME_MEM_RUN03.ASC35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_AP_TIME_MEM_RUN04.ASC35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_LTK_R2_LMG100.dlis35518EDDigital DataMonday, January 31, 2022AOGCCPage 1 of 5Supplied byOpSupplied byOpCPAI_MT7-,04_FE_COMPOSITE_MEM.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20829-00-00Well Name/No. GMTU MT7-04Completion StatusWAGINCompletion Date6/4/2021Permit to Drill2210170Operator ConocoPhillips Alaska, Inc.MD23605TVD8445Current StatusWAGIN1/31/2022UICYesDF8/23/2021 Electronic File: CPAI_MT7-04_mem_LTK_R3_LMG100.dlis35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_LTK_R4_LMG100.dlis35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_mem_LTK_R2_LMG100_0240scl.pdf35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_mem_LTK_R3_LMG100_0240scl.pdf35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_mem_LTK_R4_LMG100_0240scl.pdf35518EDDigital DataDF8/23/2021 Electronic File: 6.5in_CPAI_MT7-04_MTK_LMR110_5MD_run3&4_RA16.PDF35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_SDTK_DTC_5MD_MEM_Run_01.PDF35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_SDTK_DTS_5MD_MEM_Run_01.PDF35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7_04_SDTK_DTC_RUN2.PDF35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7_04_SDTK_DTS_RUN2.PDF35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_STK_LMG100.dlis35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_STK_LMG100_0048scl.pdf35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_STK_R4_LMG100.dlis35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_mem_STK_R4_LMG100_0048scl.pdf35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_2MD_MEM.cgm35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_2TVD_MEM.cgm35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_5MD_MEM.cgm35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_5TVD_MEM.cgm35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_AP_TIME_MEM.cgm35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_2MD_MEM.pdf35518EDDigital DataMonday, January 31, 2022AOGCCPage 2 of 5 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20829-00-00Well Name/No. GMTU MT7-04Completion StatusWAGINCompletion Date6/4/2021Permit to Drill2210170Operator ConocoPhillips Alaska, Inc.MD23605TVD8445Current StatusWAGIN1/31/2022UICYesDF8/23/2021 Electronic File: CPAI_MT7-04_2TVD_MEM.pdf35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_5MD_MEM.pdf35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_5TVD_MEM.pdf35518EDDigital DataDF8/23/2021 Electronic File: CPAI_MT7-04_AP_TIME_MEM.pdf35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 27_Compass Surveys_Canvas_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 27_Compass Surveys_Macro_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 27_Compass Surveys_Petrel_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 27_Compass Surveys_Surveys_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 27_Definitive Survey Report_06082021.pdf35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 83_Compass Surveys_Canvas_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 83_Compass Surveys_Macro_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 83_Compass Surveys_Petrel_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 83_Compass Surveys_Surveys_06082021.txt35518EDDigital DataDF8/23/2021 Electronic File: MT7-04_NAD 83_Definitive Survey Report_06082021.pdf35518EDDigital Data0 0 2210170 GMTU MT7-04 LOG HEADERS35518LogLog Header ScansDF9/1/20213418 23606 Electronic Data Set, Filename: 50-103-20829-00-00_MT07-04_G8-GEOISOTOPES_Corrected_Data_3417_23604_FINAL.las35584EDDigital DataDF9/1/2021 Electronic File: 50-103-20829-00-00_MT07-04_MT7-04-Mudlogging_End_of_Well_Report_FINAL.pdf35584EDDigital DataDF9/1/2021 Electronic File: 50-103-20829-00-00_MT7_04_DRILL_LOG_FINAL.pdf35584EDDigital DataMonday, January 31, 2022AOGCCPage 3 of 550-103-20829-00-00MT07-04G8-__GEOISOTOPES_Corrected_Data_3417_23604_FINAL.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20829-00-00Well Name/No. GMTU MT7-04Completion StatusWAGINCompletion Date6/4/2021Permit to Drill2210170Operator ConocoPhillips Alaska, Inc.MD23605TVD8445Current StatusWAGIN1/31/2022UICYesWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:6/4/2021Release Date:4/8/2021DF9/1/2021 Electronic File: 50-103-20829-00-00_MT7_04_GAS_RATIO_LOG_FINAL.pdf35584EDDigital DataDF9/1/2021 Electronic File: 50-103-20829-00-00_MT7_04_MUDLOG_FINAL.pdf35584EDDigital Data0 0 2210170 GMTU MT7-04 LOG HEADERS35584LogLog Header ScansDF9/16/2021112 23606 Electronic Data Set, Filename: 50-103-20829-00-00_MT07-04_Cuttings_Percentages_111-23605ft_FINAL.las35584EDDigital Data0 0 2210170 GMTU MT7-04 LOG HEADERS, late submission from 09/01/202135584LogLog Header ScansDF9/27/2021112 23606 Electronic Data Set, Filename: ConocoPhillips_MT07-04_Cuttings_Percentages_111-23605ft_Final-corrected.las35584EDDigital Data0 0 2210170 GMTU MT7-04 LOG HEADERS, late submission from 09/27/202135584LogLog Header Scans6/22/2021200 2360581779CuttingsMonday, January 31, 2022AOGCCPage 4 of 550-103-20829-00-,00_MT07-04_Cuttings_Percentages_111-__23605ft_FINAL.las,ConocoPhillipsMT07-p_04_Cuttings_Percentages_111-23605ft_Final-_g_corrected.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20829-00-00Well Name/No. GMTU MT7-04Completion StatusWAGINCompletion Date6/4/2021Permit to Drill2210170Operator ConocoPhillips Alaska, Inc.MD23605TVD8445Current StatusWAGIN1/31/2022UICYesComments:Compliance Reviewed By:Date:Monday, January 31, 2022AOGCCPage 5 of 5M. Guhl 1/31/2022 TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: MT7-04 DATE: 09/26/2021 Transmitted: NPRA, Greater Moose’s Tooth Via SFTP ____ Geolog Mud %lithology las - redo correction MT7-04 is located in a federal oil and gas unit. Only with respect to the MT7-04 Well Data, CPAI hereby waives its right to indefinite confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for wells not on State land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS 43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: MT7-04 e-transmittal well folder Receipt: Date: Alaska Data Support |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 37' (6HW 09/27/2021 'DWD$GGLWLRQWR2ULJLQDO)ROGHU By Abby Bell at 6:46 pm, Sep 27, 2021 TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: MT7-04 DATE: 09/18/2021 Transmitted: NPRA, Greater Moose’s Tooth Via SFTP ____ Geolog Mud %lithology las MT7-04 is located in a federal oil and gas unit. Only with respect to the MT7-04 Well Data, CPAI hereby waives its right to indefinite confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for wells not on State land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS 43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: MT7-04 e-transmittal well folder Receipt: Date: Alaska Data Support |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 09/16/2021 37' (6HW 'DWD5HVXEPLWWDO$GGLWLRQ By Abby Bell at 2:44 pm, Sep 16, 2021 TTT RR AA NN SS MM II TT TT AA LL FROM:: Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: MT7-04 DATE: 09/01/2021 Transmitted: NPRA, Greater Mooses Tooth Via SFTP ____ Geolog Mud log data package MT7-04 is located in a federal oil and gas unit. Only with respect to the MT7-04 Well Data, CPAI hereby waives its right to indefinite confidentiality, under 5 U.S.C. 552(b)(4) and (9). Nothing in this communication should be construed as a waiver of indefinite confidentiality on any other wells. Please note that for wells not on State land, a state agency should seek consent from the landowner prior to the release of well data by the state agency. See, e.g., AS 43.55.025(f)(2)(C)(i). Here, the landowner is the Bureau of Land Management (BLM) and/or Arctic Slope Regional Corporation (ASRC). Transmittal instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com CC: MT7-04 e-transmittal well folder Receipt: Date: Alaska Data Support|ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 09/01/2021 37' (6HW By Abby Bell at 11:45 am, Sep 01, 2021 1 B A A A 3 A S T I M r c P r L T S T+1337.856- 1058 Baker Hu Broussard, LA August 20,20 AOGCC Attention: Na 333 W. 7th Av Anchorage,A Subject: The final deli Items delive r MT7-04 is lo c right to indef construed as Please note t release o f we Land Mana g Thankyou. Signature of -7201 ghes Drive 70518, USA 021 atural Reso u ve.,Suite 100 Alaska 99501 iverables we red:MWD/LW cated in a fe finite confide s awaiverof that for wells ell data by th gement (BLM) receive r &d urces Technic 1-3539 Final MT7- Grea API # Perm Rig: ere uploaded WDDigitalLas deral oil and entiality, und f indefinite c o s not on State he state age )and/or Arct date received cian l Log Distribu -04 ater Mooses T #: 50-103-20 mit No: 221-01 Doyon 25 d via https://c s Data,Grap d gas unit.O er 5 U.S.C. 5 5 onfidentiality e land, a sta t ncy.See,e.g tic Slope Reg d: ution for Con Tooth 0829-00 17 copsftp.share hic Images C nly with resp 52(b)(4) and y on anyothe teagencysh ., AS 43.55.02 gional Corpo nocoPhillips efile.com/ fo CGM/PDF and pect to the MT d (9).Nothing erwells. hould seekco 25(f)(2)(C)(i) oration (ASRC Alaska, Inc. or the above d Survey File s T7-04Well D g in this co m onsent from t ). Here,the la C). well. s. Data,CPAI he mmunication the landown andowner is reby waives should be ner prior to th the Bureau o its he of ignature of receive r &ddate rece 08/23/2021 15% &4FU By Abby Bell at 9:17 am, Aug 23, 2021 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _____________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 821' FSL, 3237' FWL, S6 T9N R2E UM 17. Field / Pool(s): 9. Ref Elevations: KB: GL: BF: Total Depth: 805' FSL, 3524' FWL S17 T9N R2E UM 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22.Logs Obtained: GR, RES, PWD, DIR, AZI, DEN, NEU, CALIPER, POROSITY, ACOUSTIC, NMR, NBI, SONIC 23. BOTTOM 20" H-40 120 10 yrds 13.375" L-80 3051 7.625" L-80 8356 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr): Press.24-Hour Rate Sr Res EngSr Pet GeoSr Pet Eng Greater Mooses Tooth/Undefined Oil Pool 1889'MD/1862"TVD Oil-Bbl:Water-Bbl: Perfed tubing: 11830-12335' MD/8369'-8425'TVD Gas-Oil Ratio:Choke Size:Water-Bbl: Flow Tubing Injector - Not Pre-Produced Date of Test: Oil-Bbl: Per 20 AAC 25.283 (i)(2) attach electronic information 29.7 39.6 PACKER SET (MD/TVD) TUBING RECORD 68 120' 39.6 11741' GRADE PRODUCTION TEST 286016 291208 TOP SETTING DEPTH MD 39.6' 39.6 5910471 5899747 94 16" Lead: 486bbls of 11ppg DeepCRETE Tail: 75bbls of 15.8ppg Class G 39.6 6/1/2021 CEMENTING RECORD 981'MD/980'TVD SETTING DEPTH TVD TOP HOLE SIZE AMOUNT PULLED suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary P.O. Box 100360, Anchorage, AK 99510-0360 5915809 CASING WT. PER FT. 289972 50-103-20829-00-00 GMTU MT7-04 AA081800, AA081781, AA081736 987' FSL, 1894' FWL, S32 T10N R2E UM 932525000, 932516000, 300840000 4/27/2021 23605'MD/8445'TVD N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 6/4/2021 221-017 N/A 42" BOTTOM 12365'4.5' SIZE DEPTH SET (MD) 11595'MD/8331'TVD ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 75bbls of 15.8 Class G11" 39.6 3387' If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): WINJ SPLUGOther Abandoned Suspended Stratigraphic Test No No (attached) No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 2:38 pm, Jun 30, 2021 RBDMS HEW 7/7/2021 Completion Date 6/4/2021 HEW , mudlogs MDG 7/12/2021 DLB 07/12/2021 100.8' MDG mudlogs SFD 7/16/2021 DLB 140.6' VTL 01/31/2022 DSR-8/4/21 G Rendezvous Oil Pool Conventional Core(s): Yes No Sidewall Cores: N/A 30. MD TVD Surface Surface 981 980 C40 1408 1400 1664 1649 2029 1992 3310 2999 4189 3608 4463 3799 HRZ 9723 7451 N/A 9815 7511 LCU/Miluveach 10000 7630 Top of Productive Interval (Alpine C):11674 8346 Formation at total depth (TD):23605 8445 31. List of Attachments: Summary of Operations, Schematic, Definitive Survey 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Brad Gorham Contact Email:brad.gorham@conocophillips.com Authorized Contact Phone:907-265-6487 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. C30 Albian 97 Kalubik C10 K-3 INSTRUCTIONS Authorized Name: Authorized Title: Signature w/Date: Jenna Taylor Wells Engineering Technician Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Albian 96 The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). No NoSidewall Cores: Yes No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment Digitally signed by 4b05089e-b090-4fb0-9bb3-410505d45d8a DN: CN=4b05089e-b090-4fb0-9bb3-410505d45d8a Reason: I am the author of this document Location: your signing location here Date: 2021.06.30 14:15:19-08'00' Foxit PhantomPDF Version: 10.1.3 Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By LAST TAG:MT7-04 jennalt Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: NEW WELL MT7-04 claytg Casing Strings Casing Description CONDUCTOR OD (in) 20 ID (in) 19.12 Top (ftKB) 39.6 Set Depth (ftKB) 120.0 Set Depth (TVD) (… 120.0 Wt/Len (l… 94.00 Grade Top Thread Welded Casing Description SURFACE OD (in) 13 3/8 ID (in) 12.42 Top (ftKB) 39.6 Set Depth (ftKB) 3,386.5 Set Depth (TVD) (… 3,051.0 Wt/Len (l… 68.00 Grade L-80 Top Thread BTCM Casing Description INTERMEDIATE OD (in) 7 5/8 ID (in) 6.91 Top (ftKB) 39.6 Set Depth (ftKB) 11,741.0 Set Depth (TVD) (… 8,356.4 Wt/Len (l… 29.70 Grade L80 Top Thread Hyd563 Tubing Strings Tubing Description TUBING PRODUCTION String Max … 4 1/2 ID (in) 3.96 Top (ftKB) 34.8 Set Depth (ft… 12,365.4 Set Depth (TVD) (ft… 8,425.2 Wt (lb/ft) 12.60 Grade L-80 Top Connection Hyd563 Completion Details Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Item Des Com Nominal ID (in) 34.8 34.8 0.00 HANGER FMC 4-1/2" Tubing Hanger Hydril HYD 563 Min ID 3.92" 3.958 1,888.9 1,862.4 20.89 NIPPLE NIPPLE,LANDING,4 1/2","X",3.813", H563 3.813 11,570.3 8,326.0 77.95 GAUGE/PUMP SENSOR Halliburton Opsis Mandrel w/ Downhole guage (11,588') 3.898 11,594.5 8,330.9 78.42 PACKER Baker Premier Production Packer, 4 1/2" X 7 5/8" 33.7# (11,603') 3.880 11,663.1 8,343.9 79.80 NIPPLE NIPPLE,LANDING,4 1/2","DB-6",3.75", H563 3.750 11,726.4 8,354.2 81.43 FRAC SLEEVE Baker Frac Sleeve, H563, 3.688" Ball Seat 3.637 12,364.9 8,425.2 85.93 SHOE NS Dissolving shoe, 4-1/2" TXP 3.958 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 11,830.0 12,355.0 8,369.1 8,424.5 6/5/2021 20.0 PERFP Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 1,951.5 1,920.6 22.15 Camco KBMG 1 GAS LIFT DMY BK 0.250 6/4/2021 2 11,092.1 8,187.7 68.56 Camco KBMG 1 GAS LIFT DMY BK 0.250 6/4/2021 Notes: General & Safety End Date Annotation NOTE: HORIZONTAL, MT7-04, 6/17/2021 1:44:07 PM Vertical schematic (actual) PERFP; 11,830.0-12,355.0 INTERMEDIATE; 39.6- 11,741.0 FRAC SLEEVE; 11,726.4 NIPPLE; 11,663.1 PACKER; 11,594.5 INJECTION; 11,092.1 SURFACE; 39.6-3,386.5 INJECTION; 1,951.5 NIPPLE; 1,888.9 CONDUCTOR; 39.6-120.0 HANGER; 34.8 WNS SVC KB-Grd (ft) 39.78 Rig Release Date 6/5/2021 MT7-04 ... TD Act Btm (ftKB) 23,605.0 Well Attributes Field Name RENDE Wellbore API/UWI 501032082900 Wellbore Status SVC Max Angle & MD Incl (°) 96.48 MD (ftKB) 23,572.28 WELLNAME WELLBOREMT7-04 H2S (ppm) DateComment SSSV: NIPPLE Annotation LAST WO: End Date Page 1/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/23/2021 00:00 4/23/2021 02:00 2.00 MIRU, MOVE MOB P PJSM, Unplug complexes & prep casing shed f/ move 0.0 0.0 4/23/2021 02:00 4/23/2021 06:30 4.50 MIRU, MOVE MOB P Move ball mill package & casing shed f/ CD5 t/ MT7, Spot ball mill in place & unhook trucks 0.0 0.0 4/23/2021 06:30 4/23/2021 08:00 1.50 MIRU, MOVE MOB P PJSM, Hook up motor & pump complexes t/ truck & stage out f/ move f/ CD5 t/ MT7 SIMOPS- Load and send rig mats f/ CD5 t/ MT& 0.0 0.0 4/23/2021 08:00 4/23/2021 11:00 3.00 MIRU, MOVE MOB P PJSM, Move motor & pump complexes f/ CD5 t/ MT& 0.0 0.0 4/23/2021 11:00 4/23/2021 12:00 1.00 MIRU, MOVE MOB P Spot complexes in place & unhook trucks SIMOPS- Laying rig mats f/ pit, sub, & pipe complexes 0.0 0.0 4/23/2021 12:00 4/24/2021 00:00 12.00 MIRU, MOVE WAIT P Cont. t/ spot mats f/ pit, sub, & pipe complexes. Prep complexes f/ move f/ CD5 t/ MT7 w/ waiting on ice roads t/ open 0.0 0.0 4/24/2021 00:00 4/24/2021 01:00 1.00 MIRU, MOVE MOB P Move & stage rig mats f/ transport f/ CD5 t/ MT7 0.0 0.0 4/24/2021 01:00 4/24/2021 01:30 0.50 MIRU, MOVE MOB P PJSM, install jeep on pipe shed 0.0 0.0 4/24/2021 01:30 4/24/2021 02:30 1.00 MIRU, MOVE MOB P PJSM, hook pipe shed t/ Peak truck f/ transport 0.0 0.0 4/24/2021 02:30 4/24/2021 03:30 1.00 MIRU, MOVE MOB P PJSM, install jeep onto pit complex & hook same t/ Peak truck f/ tranport 0.0 0.0 4/24/2021 03:30 4/24/2021 08:00 4.50 MIRU, MOVE MOB P PJSM, move pipe shed & pit complexes f/ CD5 t/ MT7 w/ Peak trucks 0.0 0.0 4/24/2021 08:00 4/24/2021 09:30 1.50 MIRU, MOVE MOB P Prep sub complex f/ move t/ MT7 0.0 0.0 4/24/2021 09:30 4/24/2021 10:00 0.50 MIRU, MOVE MOB P Pull sub off well & spot f/ transport t/ MT7 0.0 0.0 4/24/2021 10:00 4/24/2021 13:00 3.00 MIRU, MOVE MOB P Move sub f/ CD5 t/ MT7 0.0 0.0 4/24/2021 13:00 4/24/2021 14:00 1.00 MIRU, MOVE MOB P Position sub complex on mats w/ Peak truck 0.0 0.0 4/24/2021 14:00 4/24/2021 16:30 2.50 MIRU, MOVE MOB P Position pipe shed complex on to mats w/ Peak trucks 0.0 0.0 4/24/2021 16:30 4/24/2021 20:00 3.50 MIRU, MOVE MOB P Use stompers & move pipe shed t/ sub & pin same together, use stompers t/ position pits up against sub 0.0 0.0 4/24/2021 20:00 4/24/2021 22:00 2.00 MIRU, MOVE MOB P Raise derrick w/ spotting casing shed & pinning t/ sub 0.0 0.0 4/24/2021 22:00 4/25/2021 00:00 2.00 MIRU, MOVE MOB P Skid rig floor over well w/ using stompers t/ pin pump & engine complexes together 0.0 0.0 4/25/2021 00:00 4/25/2021 01:00 1.00 MIRU, MOVE MOB P Lower C-section & Raise cattle shute w/ hooking up electrical and fluid connections between complexes 0.0 0.0 4/25/2021 01:00 4/25/2021 05:00 4.00 MIRU, MOVE MOB P Organize rig floor, prep f/ scoping derrick, Lower cellar windwalls into place w/ cont. t/ hook up electrical & fluid connection between packages 0.0 0.0 4/25/2021 05:00 4/25/2021 06:00 1.00 MIRU, MOVE MOB P PJSM, Swap complexes over t/ 3516 generator power & scope up derrick 0.0 0.0 4/25/2021 06:00 4/25/2021 08:00 2.00 MIRU, MOVE MOB P PJSM, Install ST-80 back on floor 0.0 0.0 4/25/2021 08:00 4/25/2021 09:00 1.00 MIRU, MOVE MOB P PJSM, Install mousehole & Hook kelly hose t/ TDS 0.0 0.0 Rig: DOYON 25 Page 2/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/25/2021 09:00 4/25/2021 10:45 1.75 MIRU, MOVE MOB P PJSM, C/O saver sub f/ XT-39 t/ 4 1/2 IF 0.0 0.0 4/25/2021 10:45 4/25/2021 11:30 0.75 MIRU, MOVE MOB P Install bails & time same w/ link tilt on TDS 0.0 0.0 4/25/2021 11:30 4/25/2021 15:00 3.50 MIRU, MOVE NUND P PJSM, N/U riser spool & diverter, hook up koomey lines, flow line, flow box & jet lines, Level & block diverter line 0.0 0.0 4/25/2021 15:00 4/25/2021 16:30 1.50 MIRU, MOVE OTHR P Install ball valves on conductor, Install flooring in cellar area, assist Geo-log w/ rig up of their equip in pit room 0.0 0.0 4/25/2021 16:30 4/25/2021 17:30 1.00 MIRU, MOVE SLPC P PJSM, slip & cut drill line & recalibrate drawworks 0.0 0.0 4/25/2021 17:30 4/25/2021 18:00 0.50 MIRU, MOVE SVRG P Rig service, grease TDS, drawworks, & blocks, check oil in same 0.0 0.0 4/25/2021 18:00 4/25/2021 21:00 3.00 MIRU, MOVE OTHR P Cont. t/ make up diverter line w/ picking up Baker MWD and breaking sub f/ Baker t/ trouble shoot communication problems SIMOPS - Changing out Eddy pump in pit room and Geo-log rigging up logging equip. 0.0 0.0 4/25/2021 21:00 4/26/2021 00:00 3.00 MIRU, MOVE OTHR P Cont. making up diverter line SIMOPS - Changing out Eddy pump in pit room and Geo-log rigging up logging equip. 0.0 0.0 4/26/2021 00:00 4/26/2021 00:30 0.50 MIRU, MOVE OTHR P Finish c/o of eddy pump in pits 0.0 0.0 4/26/2021 00:30 4/26/2021 02:00 1.50 MIRU, MOVE OTHR P Organize 5'' HWDP in pipe shed f/ pick up SIMOPS- Making up diverter line 0.0 0.0 4/26/2021 02:00 4/26/2021 03:30 1.50 MIRU, MOVE OTHR P Install bales and elevators & P/U 5'' HWDP 7 drlg jars SIMOPS- Making up diverter line 0.0 0.0 4/26/2021 03:30 4/26/2021 06:00 2.50 MIRU, MOVE OTHR P Organize Baker BHA in pipe shed f/ pick up w/ making up diverter line (305' total length) SIMOPS- Taking on mud 0.0 0.0 4/26/2021 06:00 4/26/2021 07:00 1.00 MIRU, MOVE RURD P Cont R/U Geo-log SIMOPS- P/U HT-100 rig tongs 0.0 0.0 4/26/2021 07:00 4/26/2021 08:00 1.00 MIRU, MOVE OTHR P Pre-spud meeting between rig team & town SIMOPS- Baker trouble shooting communication issues w/ TCS box. Changed out box and restored communication. 0.0 0.0 4/26/2021 08:00 4/26/2021 09:30 1.50 MIRU, MOVE RURD P Cont. w/ rig up of Geo-log equip. SIMOPS- BWM on BOPE 0.0 0.0 4/26/2021 09:30 4/26/2021 11:00 1.50 MIRU, MOVE PRTS P Perfrom diverter test, Koomey draw down Before- 2,900 psi, After- 2,100 psi, 60 sec f/ 200 psi build w/ 1 elec. pump, 60 sec t/ build full system psi w/ 2 elec. motor & 2 air pumps, N2 bottle average psi 1,850, Annular closing time- 26 sec, Knife valve opening time- 15 sec, Test PVT gain/loss, Test LEL & H2S alarms, All test OK & witnessed by AOGCC Rep Jeff Jones 0.0 0.0 Rig: DOYON 25 Page 3/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/26/2021 11:00 4/26/2021 12:00 1.00 MIRU, MOVE RURD P Cont rigging up Geo-log, Prep rig floor f/ surface BHA SIMOPS- BWM of BOPE 0.0 0.0 4/26/2021 12:00 4/26/2021 12:30 0.50 MIRU, MOVE OTHR P Swap rig over t/ high line power @ 12:23 on 4/26/21 0.0 0.0 4/26/2021 12:30 4/26/2021 13:30 1.00 MIRU, MOVE OTHR P PJSM, Install rotary bushings, Modify bit breaker f/ Baker BHA SIMOPS- Taking on Clay shield mud t/ the pits 0.0 0.0 4/26/2021 13:30 4/26/2021 15:00 1.50 MIRU, MOVE RURD P Finish rigging up Geo-log equip. Pre spud meeting w/ rig crew 0.0 0.0 4/26/2021 15:00 4/26/2021 16:30 1.50 MIRU, MOVE PRTS P Test mud lines t/ 3,500 psi f/ 5 min. Test OK, Function test jet lines on flow line, Test OK 0.0 0.0 4/26/2021 16:30 4/26/2021 17:00 0.50 MIRU, MOVE SVRG P Rig Servie, Grease drawworks, TDS & check oil in same 0.0 0.0 4/26/2021 17:00 4/27/2021 00:00 7.00 MIRU, MOVE RGRP T Trouble shoot Amphion sysytem f/ setting e-brake on drawworks SIMOPS- Process 13 3/8'' csing, Load pit room w/ dry products, Perform equip. pm's 0.0 0.0 4/27/2021 00:00 4/27/2021 04:00 4.00 MIRU, MOVE RGRP T NOV & Doyon electrcian changed out VFD chopper & reset computer system 0.0 0.0 4/27/2021 04:00 4/27/2021 05:30 1.50 MIRU, MOVE PULD P PJSM, P/U mud motor, M/U bit, M/U NMPC & XO, P/U std 5'' HWDP 0.0 0.0 4/27/2021 05:30 4/27/2021 08:30 3.00 MIRU, MOVE CIRC P PJSM, C/O knife valve on diverter line 0.0 0.0 4/27/2021 08:30 4/27/2021 10:00 1.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 100' t/ 244' WOB- 6-8K RPM-40 Torq.-3K GPM-500 Flow out- 57% P/U- 56K S/O- 45K Rot- 50K ART- 1.1 ADT- 1.1 Total Bit Hrs- 1.1 0.0 244.0 4/27/2021 10:00 4/27/2021 11:30 1.50 SURFAC, DRILL TRIP P Blow down TDS & rack back 5'' HWDP t/ pick up Baker MWD 244.0 244.0 4/27/2021 11:30 4/27/2021 12:30 1.00 SURFAC, DRILL PULD P PJSM, P/U Baker On-trak & Sound-Trak tools, Test same, Test OK 244.0 244.0 4/27/2021 12:30 4/27/2021 18:00 5.50 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 244' t/ 618' WOB- 6-8K RPM-40 Torq.-4-8K GPM-500 On Btm PSI- 978 Off Btm PSI- 868 Flow out- 57% P/U- 91K S/O- 82K Rot- 86K AST- .7 ART- 2.5 ADT- 3.2 Total Bit Hrs- 4.3 244.0 618.0 Rig: DOYON 25 Page 4/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/27/2021 18:00 4/28/2021 00:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 618' t/ 970' WOB- 15-18K RPM-50 Torq.-4-8K GPM-500 On Btm PSI- 1230 Off Btm PSI- 868 Flow out- 48% ECD- 10.87 PPG P/U- 106K S/O- 102K Rot- 104K AST- 2.4 ART- 2.4 ADT- 4.8 Total Bit Hrs- 9.1 Total Jars- 5.3 618.0 970.0 4/28/2021 00:00 4/28/2021 06:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 970' t/ 1,250' WOB- 20-25K RPM-50 Torq.-5-10K GPM-550 On Btm PSI- 1520 Off Btm PSI- 1325 Flow out- 48% ECD- 10.87 PPG P/U- 106K S/O- 102K Rot- 104K AST- 2.7 ART- 5 ADT- 5 Total Bit Hrs- 14.1 Total Jars- 10.3 970.0 1,250.0 4/28/2021 06:00 4/28/2021 12:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 1,250 ' t/ 1,546' WOB- 12-18K RPM-60 Torq.-5-10K GPM-635 On Btm PSI- 1560 Off Btm PSI- 1410 Flow out- 53% ECD- 10.87 PPG P/U- 117K S/O- 110K Rot- 114K AST- 2 ART- 3.7 ADT- 5.7 Total Bit Hrs- 18.8 Total Jars- 15 1,250.0 1,546.0 Rig: DOYON 25 Page 5/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/28/2021 12:00 4/28/2021 18:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 1,546' t/ 2,078' WOB- 12-18K RPM-60 Torq.-8-12K GPM-750 On Btm PSI- 2120 Off Btm PSI- 1925 Flow out- 69% ECD- 10.94 PPG P/U- 123K S/O- 120K Rot- 122K AST- 1.8 ART- 2.6 ADT- 4.4 Total Bit Hrs- 23.2 Total Jars- 19.4 1,546.0 2,078.0 4/28/2021 18:00 4/29/2021 00:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 2,078' t/ 2,672' WOB- 12-18K RPM-60 Torq.-8-12K GPM-800 On Btm PSI- 2360 Off Btm PSI- 2180 Flow out- 72% ECD- 11.05 PPG P/U- 135K S/O- 127K Rot- 132K AST- 1.6 ART- 3.0 ADT- 4.6 Total Bit Hrs- 27.8 Total Jars- 24 2,078.0 2,672.0 4/29/2021 00:00 4/29/2021 06:00 6.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 2,672' t/ 3,183' WOB- 12-18K RPM-60 Torq.-8-12K GPM-800 On Btm PSI- 2600 Off Btm PSI- 2425 Flow out- 72% ECD- 11.05 PPG P/U- 153K S/O- 1133K Rot- 137K AST- 1.6 ART- 2.9 ADT- 4.5 Total Bit Hrs- 32.3 Total Jars- 28.5 2,672.0 3,183.0 Rig: DOYON 25 Page 6/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/29/2021 06:00 4/29/2021 10:00 4.00 SURFAC, DRILL DDRL P Drill 16'' Surface f/ 3,183' t/ 3,397' WOB- 22-27K RPM-60 Torq.-8-12K GPM-800 On Btm PSI- 2925 Off Btm PSI- 2700 Flow out- 72% ECD- 11.05 PPG P/U- 153K S/O- 1133K Rot- 137K AST- 0 ART- 3.4 ADT- 3.4 Total Bit Hrs- 35.7 Total Jars- 31.9 3,183.0 3,397.0 4/29/2021 10:00 4/29/2021 12:00 2.00 SURFAC, CASING CIRC P Circ hole clean @ 3,397' GPM: 850 PSI: 2916 RPM: 60 Torq: 5K Flow out spiked & hole unloaded large clay chunks, Reduce flow t/ handle cuttings @ shakers and staged pumps back t/ 850 GPM as shakers cleaned up 3,397.0 3,397.0 4/29/2021 12:00 4/29/2021 12:30 0.50 SURFAC, CASING CIRC P Circ Btms up @ 3,397' t/ clean hole f/ trip GPM: 850 PSI: 2900 3,397.0 3,397.0 4/29/2021 12:30 4/29/2021 13:30 1.00 SURFAC, CASING CIRC P Pump nut plug sweep around w/ working pipe f/ 3,397' t/ 3,369' After sweep was out of hole racked stand back in derrick 3,397.0 3,397.0 4/29/2021 13:30 4/29/2021 14:30 1.00 SURFAC, CASING CIRC P Pump lo/hi vis sweep w/ working pipe f/ 3,369' t/ 3,305' Racked stand back once sweep has reached surface 3,397.0 3,397.0 4/29/2021 14:30 4/29/2021 17:30 3.00 SURFAC, CASING CIRC P Circ nut plug sweep around w/ working pipe f/ 3,305' t/ 3,089' Cont. circulating until cuttings clean up @ shakers 3,397.0 3,397.0 4/29/2021 17:30 4/29/2021 18:00 0.50 SURFAC, CASING OTHR P Blow down top drive & mud lines 3,397.0 3,397.0 4/29/2021 18:00 4/29/2021 18:30 0.50 SURFAC, CASING OWFF P Flow check well @ 3,089' Well static 3,397.0 3,397.0 4/29/2021 18:30 4/29/2021 19:30 1.00 SURFAC, CASING TRIP P Attempt t/ POOH on elevators w/ no success, Observed 33K over pull @ 3,027' 3,397.0 3,397.0 4/29/2021 19:30 4/29/2021 23:00 3.50 SURFAC, CASING BKRM P BROOH f/ 3,027' t/ 1,863' GPM: 800 RPM: 40-50 Torq: 6-8 3,397.0 3,397.0 4/29/2021 23:00 4/29/2021 23:30 0.50 SURFAC, CASING CIRC P Circ btms up @ 1,863' 3,397.0 3,397.0 4/29/2021 23:30 4/30/2021 00:00 0.50 SURFAC, CASING OWFF P Flow chk well, well static, drop gyro 3,397.0 3,397.0 4/30/2021 00:00 4/30/2021 02:15 2.25 SURFAC, CASING BKRM P BROOH f/ 1,863' t/ 1,300' GPM: 650 RPM: 20 Torq: 6-8 3,397.0 3,397.0 Rig: DOYON 25 Page 7/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/30/2021 02:15 4/30/2021 02:45 0.50 SURFAC, CASING CIRC P Circ btms up @ 1,300' 3,397.0 3,397.0 4/30/2021 02:45 4/30/2021 07:00 4.25 SURFAC, CASING PMPO P Attempt t/ POOH on elevators, No success, 25K over pull, Pump out of hole f/ 1,300' t/ 987' Attempt t/ pull on elevators, No success, 25K over pull, Cont. pumping out of hole t/ 500' Attempt t/ pull on elevators, No success 25K over pull, Cont pumping out of hole t/ 257' 3,397.0 3,397.0 4/30/2021 07:00 4/30/2021 07:30 0.50 SURFAC, CASING TRIP P Take final gyro survey, TOOH on elevators f/ 257' t/ BHA 3,397.0 3,397.0 4/30/2021 07:30 4/30/2021 10:00 2.50 SURFAC, CASING BHAH P PJSM, L/D NMDC, Stab, & Sound trak, Drain motor, Break bit, L/D same 3,397.0 3,397.0 4/30/2021 10:00 4/30/2021 10:30 0.50 SURFAC, CASING OTHR P Clean rig floor f/ BHA lay down before rigging up casing equip. 3,397.0 3,397.0 4/30/2021 10:30 4/30/2021 12:30 2.00 SURFAC, CASING RURD P PJSM, R/U casing equipment, Volant, bale extensions, elevators & slipd 3,397.0 3,397.0 4/30/2021 12:30 4/30/2021 14:30 2.00 SURFAC, CASING PUTB P M/U 13 3/8'' Shoe Track & test same, test OK 3,397.0 3,397.0 4/30/2021 14:30 4/30/2021 18:00 3.50 SURFAC, CASING PUTB P RIH w/ 13 3/8'' 68 ppf L-80 BTCM csing f/ 124' t/ 1,073' Filling pipe every 5 joints & monitoring returns on the trip tank 3,397.0 3,397.0 4/30/2021 18:00 4/30/2021 18:30 0.50 SURFAC, CASING CIRC P Circ btms up @ 1,073' once below perm -frost 3,397.0 3,397.0 4/30/2021 18:30 5/1/2021 00:00 5.50 SURFAC, CASING PUTB P Cont. RIH w/ 13 3/8'' 68 ppf L-80 BTCM csing f/ 1,073' t/ 3,099' Filling pipe every 5 joints & monitoring returns on the trip tank 3,397.0 3,397.0 5/1/2021 00:00 5/1/2021 00:30 0.50 SURFAC, CASING PUTB P Cont. RIH w/ 13 3/8'' 68 ppf L-80 BTCM casing f/ 3,099' t/ 3,319' Filling pipe every 5 joints & monitoring returns on the trip tank 3,397.0 3,397.0 5/1/2021 00:30 5/1/2021 01:30 1.00 SURFAC, CASING WASH P Casing started taking weight @ 3,319' Wash casing down f/ 3,319' t/ 3,344' 6 BPM PSI 170 3,397.0 3,397.0 5/1/2021 01:30 5/1/2021 02:15 0.75 SURFAC, CASING HOSO P PJSM, M/U hanger & landing joint, Wash down f/ 3,344' t/ 3,384' 3,397.0 3,397.0 5/1/2021 02:15 5/1/2021 05:00 2.75 SURFAC, CEMENT CIRC P Circ & cond. mud w/ reciprocating casing f/ 3,384' t/ 3,364' Stage pumps up t/ 8 bpm PSI-203 3,397.0 3,397.0 5/1/2021 05:00 5/1/2021 05:45 0.75 SURFAC, CEMENT RURD P PJSM, Blow down mud line, R/U cementing iron, Circ through cement hose & establish circ parameters f/ cement job 3,397.0 3,397.0 Rig: DOYON 25 Page 8/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/1/2021 05:45 5/1/2021 10:45 5.00 SURFAC, CEMENT CMNT P SLB pump 5 bbls of fresh H2O. Tested lines to 500 psi low/ 3500 psi high, pump 107 bbls of 10.8 ppg Mud Push II with red die @ 3 bbls/min, 420 psi, 22% F/O, Dropped bottom plug. Start batching lead. Pump 486 bbls of 11.0 ppg DeepCRETE cement at 5bbls/min, 750 psi ICP, F/O 28%. Batch and pump 75 bbls of G Blend Tail 15.8 ppg cement @ 5 bbls/min, 755 psi, F/O 28%. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10 ppg Ksi mud @ 7 bbls/min, 260 psi, F/O 37%. Bump plug with 1100 psi (475 bbls + 20 bbls). 4721 strokes, final circ. PSI 600 Pressure up to 1000 psi & hold for 5 minutes. Bleed off pressure, Check floats good. 254 bbls cement to surface. 3,397.0 3,397.0 5/1/2021 10:45 5/1/2021 12:00 1.25 SURFAC, CEMENT CIRC P Flush surface equip. w/ blackwater pills 3,397.0 3,397.0 5/1/2021 12:00 5/1/2021 14:00 2.00 SURFAC, CEMENT CIRC P Flush riser. diverter, flow line & flow box w/ blackwater, Drain surface risers SIMOPS- R/D casing equipment, P/U PS-21 slips 3,397.0 3,397.0 5/1/2021 14:00 5/1/2021 17:30 3.50 SURFAC, CEMENT NUND P PJSM, Pull 90' mousehole, Nipple down diverter, bell nipple, surface riser & take diverter line apart 3,397.0 3,397.0 5/1/2021 17:30 5/1/2021 21:00 3.50 SURFAC, WHDBOP NUND T PJSM, Nipple up FMC well head Threads on lock ring and wellhead damaged and had to file burrs off threads. Rolled seal ring while stabbing wellhead and had to pull and replace seal 3,397.0 3,397.0 5/1/2021 21:00 5/2/2021 00:00 3.00 SURFAC, WHDBOP NUND P PJSM, Nipple up BOP's, Hook up choke & kill line, Hook up flow line & MPD equipment 3,397.0 3,397.0 5/2/2021 00:00 5/2/2021 01:00 1.00 SURFAC, WHDBOP NUND P Nipple up BOPE & MPD equipment 3,397.0 3,397.0 5/2/2021 01:00 5/2/2021 01:30 0.50 SURFAC, WHDBOP BOPE P PJSM, R/U testing equipment 3,397.0 3,397.0 5/2/2021 01:30 5/2/2021 03:30 2.00 SURFAC, WHDBOP BOPE T PJSM, Test MPD equipment, No success water leaking by test plug FMC checked test plug and attempted to reinstall with no success Decision made t/ use upper test plug until FMC personnel could go to CD1 and pick up spare lower test plug 3,397.0 3,397.0 5/2/2021 03:30 5/2/2021 05:15 1.75 SURFAC, WHDBOP BOPE P Install MPD test plug, Fill stack & lines w/ water, Test MPD 250 psi low, 1500 psi high f/ 5 minutes each test, Pull MPD test plug & install trip nipple 3,397.0 3,397.0 Rig: DOYON 25 Page 9/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/2/2021 05:15 5/2/2021 10:45 5.50 SURFAC, WHDBOP BOPE P Install 5'' test joint, All BOPE test 250 psi low f/ 5 min, 3,500 psi high f/ 10 min, Test annular, VBR's, Choke manifold, HCR's, Manual kill valves, 5'' TIW & IBOP, Upper & Lower IBOP on TDS, Blind/shear rams, Perform koomey draw down, ACC-2950 psi, Manif. 1500 psi, ACC - 1841 psi after all fucntions, 14 sec f/ 2000 psi build w/ 2 elec. pumps, 87 sec t/ full system psi w/ 2 elec. pumps & 2 air pumps, Test PVT gain/loss & flow out alrams, Test LEL & H2S alarms, All test witnessed by Quinn Sawyer w/ BLM, AOGCC rep Lou Laubenstein waived witness of test 3,397.0 3,397.0 5/2/2021 10:45 5/2/2021 11:00 0.25 SURFAC, WHDBOP BOPE T Install lower test plug & 5'' test joint, Close upper vbr's, hcr kill & choke, Test 250 psi low f/ 5 min, 3500 psi high f/ 10 min 3,397.0 3,397.0 5/2/2021 11:00 5/2/2021 12:00 1.00 SURFAC, WHDBOP OTHR P Install wear bushing, ID 12 7/16'' 3,397.0 3,397.0 5/2/2021 12:00 5/2/2021 12:30 0.50 SURFAC, DRILLOUT FRZP P Blow TDS, choke, & mud lines 3,397.0 3,397.0 5/2/2021 12:30 5/2/2021 13:00 0.50 SURFAC, DRILLOUT OTHR P Clean rig floor & install P21 hydraulic slips 3,397.0 3,397.0 5/2/2021 13:00 5/2/2021 14:00 1.00 SURFAC, DRILLOUT BHAH P PJSM, P/U clean out bha 3,397.0 3,397.0 5/2/2021 14:00 5/2/2021 16:30 2.50 SURFAC, DRILLOUT TRIP P TIH f/ 424' t/ 3,287' Tagged up on cement stringer 3,397.0 3,397.0 5/2/2021 16:30 5/2/2021 17:00 0.50 SURFAC, DRILLOUT CIRC P Circ btms up @ 3,287' 3,397.0 3,397.0 5/2/2021 17:00 5/2/2021 18:15 1.25 SURFAC, DRILLOUT PRTS P Blow down TDS, R/U equipment f/ casing test 3,397.0 3,397.0 5/2/2021 18:15 5/2/2021 19:00 0.75 SURFAC, DRILLOUT PRTS P Test 13 1/8'' casing t/ 3,500 psi f/ 30 minutes 29 psi bleed off over 30 minutes 3,397.0 3,397.0 5/2/2021 19:00 5/3/2021 00:00 5.00 SURFAC, DRILLOUT DRLG P Drill shoe track & 20' of new hole 3,401' WOP- 10-30 RPM- 10-80 Torq- 6-12 GPM- 450-800 3,397.0 3,401.0 5/3/2021 00:00 5/3/2021 00:15 0.25 SURFAC, DRILLOUT DRLG P Drill shoe track & 20' of new hole f/ 3,401' t/ 3,417' WOP- 10-30 RPM- 10-80 Torq- 6-12 GPM- 450-800 SIMOPS- Displacing well t/ 9.6 ppg LSND 3,401.0 3,417.0 5/3/2021 00:15 5/3/2021 01:00 0.75 SURFAC, DRILLOUT CIRC P Circ & Cond mud f/ FIT, Pumped 4,758 stks Reciprocate pipe f/ 3,417' t/ 3,362' GPM- 800 PSI- 1125 3,417.0 3,417.0 Rig: DOYON 25 Page 10/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/3/2021 01:00 5/3/2021 01:30 0.50 SURFAC, DRILLOUT FIT P Perform FIT t/ 18.5 ppg equilivalent, Formation leaked off 1,145 psi 16.8 ppg equilivalent 2.8 bbls pumped, 1.5 bled back t/ trip tanks 3,417.0 3,417.0 5/3/2021 01:30 5/3/2021 01:45 0.25 INTRM1, DRILL TRIP P POOH on elevators f/ 3,362' t/ 3,250' Observed 30K overpull & well swabbing Suspected plug rubber hung between BHA & csing 3,417.0 3,417.0 5/3/2021 01:45 5/3/2021 03:00 1.25 INTRM1, DRILL CIRC T Work pipe f/ 3,250' t/ 3,156' w/ circ @ 800 GPM 5,421 stks Caught large pieces of plug rubber @ shakers on botoms up 3,417.0 3,417.0 5/3/2021 03:00 5/3/2021 05:45 2.75 INTRM1, DRILL TRIP P TOH f/ 3,156' t/ BHA on elevators monitoring returns on trip tanks Flow check well @ last stand of drill pipe, well static 3,417.0 3,417.0 5/3/2021 05:45 5/3/2021 06:30 0.75 INTRM1, DRILL BHAH P PJSM, L/D clean out, Break bit, L/D same, L/D NMDC, stab, NMDC, & Bit sub 3,417.0 3,417.0 5/3/2021 06:30 5/3/2021 07:00 0.50 INTRM1, DRILL OTHR P Clean rig floor after trip 3,417.0 3,417.0 5/3/2021 07:00 5/3/2021 10:00 3.00 INTRM1, DRILL BHAH P PJSM, P/U Baker RSS as per Baker DD 3,417.0 3,417.0 5/3/2021 10:00 5/3/2021 10:30 0.50 INTRM1, DRILL BHAH P RIH w/ 5'' HWDP f/ derrick f/ BHA t/ 1,050' 3,417.0 3,417.0 5/3/2021 10:30 5/3/2021 11:00 0.50 INTRM1, DRILL CIRC P Shallow hole test MWD @ 1,050' Test OK 3,417.0 3,417.0 5/3/2021 11:00 5/3/2021 12:30 1.50 INTRM1, DRILL TRIP P TIH f/ 1,050' t/ 3,313' Monitoring returns on trip tanks 3,417.0 3,417.0 5/3/2021 12:30 5/3/2021 13:15 0.75 INTRM1, DRILL WASH P Wash in hole f/ 3,313' t/ 3,417' RPM- 30 Torq- 6-8 GPM- 785 PSI- 1668 3,417.0 3,417.0 5/3/2021 13:15 5/3/2021 15:30 2.25 INTRM1, DRILL DDRL P Drill 9 7/8'' Intermediate Tangent f/ 3,417' t/ 3,547' WOB- 15-18K RPM-120 Torq.-6-10K GPM-785 On Btm PSI- 1660 Off Btm PSI- 1550 Flow out- 72% ECD- 10.09 PPG P/U- 151K S/O- 135K Rot- 140K ADT- 1.7 Total Bit Hrs- 1.7 Total Jars- 34.1 3,417.0 3,547.0 Rig: DOYON 25 Page 11/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/3/2021 15:30 5/3/2021 16:15 0.75 INTRM1, DRILL CIRC P Drop 1.25'' reamer activation ball Initial Turbine RPMs- 4644 Pump down rate- 100 GPM RPM- 30 Turbine RPMs after shift- 4112 Bring pumps t/ 800 GPM, Set 6K down weight t/ verify reamer opened 3,547.0 3,547.0 5/3/2021 16:15 5/3/2021 18:00 1.75 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 3,547' t/ 3,645' WOB- 15-18K RPM-120 Torq.-6-10K GPM-785 On Btm PSI- 1600 Off Btm PSI- 1500 Flow out- 72% ECD- 10.09 PPG P/U- 151K S/O- 135K Rot- 140K ADT- 1.1 Total Bit Hrs- 2.8 Total Jars- 35.2 3,547.0 3,645.0 5/3/2021 18:00 5/4/2021 00:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 3,645' t/ 4,276' WOB- 15-18K RPM-160 Torq.-10-12K GPM-830 On Btm PSI- 1665 Off Btm PSI- 1550 Flow out- 72% ECD- 10.09 PPG P/U- 160K S/O- 146K Rot- 148K ADT- 4.5 Total Bit Hrs- 7.3 Total Jars- 42.5 3,645.0 4,276.0 Rig: DOYON 25 Page 12/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/4/2021 00:00 5/4/2021 06:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 4,276' t/ 4,766' WOB- 10-15K RPM-120 Torq.-8-10K GPM-830 On Btm PSI- 1700 Off Btm PSI- 1650 Flow out- 47% ECD- 10.17 PPG P/U- 160K S/O- 146K Rot- 148K ADT- 4.9 Total Bit Hrs- 12.2 Total Jars- 44.6 Control drill @ 164 fph f/ 4,276' t/ 4,600' Control drill @ 82 fph f/ 4,600' t/ 4,766' 4,276.0 4,766.0 5/4/2021 06:00 5/4/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 4,766' t/ 5,273' WOB- 17-22K RPM-170 Torq.-15-20K GPM-830 On Btm PSI- 1835 Off Btm PSI- 1750 Flow out- 47% ECD- 10.3 PPG P/U- 188K S/O- 153K Rot- 165K ADT- 5.1 Total Bit Hrs- 17.3 Total Jars- 49.7 Control drill @ 82' fph f/ 4,766' t/ 5,200' Control drill @ 164 fph f/ 5,200' t/ 5,273' 4,766.0 5,273.0 5/4/2021 12:00 5/4/2021 14:30 2.50 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 5,273' t/ 5,571' WOB- 17-22K RPM-170 Torq.-15-20K GPM-830 On Btm PSI- 1890 Off Btm PSI- 1775 Flow out- 47% ECD- 10.3 PPG P/U- 188K S/O- 153K Rot- 165K ADT- 2.2 Total Bit Hrs- 19.5 Total Jars- 51.9 Control drill @ 164' fph f/ 5,273' t/ 5,571' 5,273.0 5,571.0 5/4/2021 14:30 5/4/2021 15:15 0.75 INTRM1, DRILL CIRC P Circ btms up @ 5,571' before shutting pumps down t/ install MPD rotating head 5,571.0 5,571.0 Rig: DOYON 25 Page 13/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/4/2021 15:15 5/4/2021 15:30 0.25 INTRM1, DRILL OWFF P Flow check well, well static 5,571.0 5,571.0 5/4/2021 15:30 5/4/2021 16:30 1.00 INTRM1, DRILL MPDA P PJSM, Pull trip nipple & install rotating head & perfrom break in procedure on bearing assembly as per Beyond procedure 5,571.0 5,571.0 5/4/2021 16:30 5/4/2021 18:00 1.50 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 5,571' t/ 5,707' WOB- 25-28K RPM-160 Torq.-15-20K GPM-830 On Btm PSI- 1990 Off Btm PSI- 1875 Flow out- 58% ECD- 10.58 PPG P/U- 200K S/O- 151K Rot- 180K ADT- 1.3 Total Bit Hrs- 20.8 Total Jars- 53.2 MPD Back psi- 0 Control drill @ 164 fph f/ 5,571' t/ 5,707' 5,571.0 5,707.0 5/4/2021 18:00 5/5/2021 00:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 5,707' t/ 6,334' WOB- 15-20K RPM-180 Torq.-15-20K GPM-830 On Btm PSI- 2110 Off Btm PSI- 2000 Flow out- 60% ECD- 10.81 PPG P/U- 218K S/O- 155K Rot- 183K ADT- 4.9 Total Bit Hrs- 25.7 Total Jars- 58.1 MPD Back psi- 0 Control drill @ 164 fph f/ 5,707' t/ 6,334' 5,707.0 6,334.0 Rig: DOYON 25 Page 14/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/5/2021 00:00 5/5/2021 06:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 6,634' t/ 6,750' WOB- 15-20K RPM-165 Torq.-15-18K GPM-830 On Btm PSI- 1950 Off Btm PSI- 1825 Flow out- 60% ECD- 10.54 PPG P/U- 216K S/O- 169K Rot- 196K ADT- 5.3 Total Bit Hrs- 31.0 Total Jars- 63.4 MPD Back psi- 0 Control drill @ 82 fph f/ 6,434' t/ 6,775' 6,334.0 6,750.0 5/5/2021 06:00 5/5/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 6,750' t/ 7,148' WOB- 20-25K RPM-165 Torq.-15-18K GPM-850 On Btm PSI- 2152 Off Btm PSI- 2025 Flow out- 60% ECD- 10.42 PPG P/U- 235K S/O- 186K Rot- 204K ADT- 5.2 Total Bit Hrs- 36.2 Total Jars- 68.6 MPD Back psi- 0 Control drill @ 82 fph f/ 6,750' t/ 7,148' 6,750.0 7,148.0 5/5/2021 12:00 5/5/2021 18:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 7,148' t/ 7,557' WOB- 20-25K RPM-150 Torq.-15-18K GPM-850 On Btm PSI- 2247 Off Btm PSI- 2150 Flow out- 60% ECD- 10.49 PPG P/U- 235K S/O- 186K Rot- 204K ADT- 5.3 Total Bit Hrs- 41.5 Total Jars- 73.9 MPD Back psi- 0 Control drill @ 82 fph f/ 7,148' t/ 7,557' 7,148.0 7,557.0 Rig: DOYON 25 Page 15/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/5/2021 18:00 5/5/2021 20:00 2.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 7,557' t/ 7,706' WOB- 15-20K RPM-150 Torq.-15-18K GPM-850 On Btm PSI- 2247 Off Btm PSI- 2150 Flow out- 60% ECD- 10.51 PPG P/U- 235K S/O- 186K Rot- 212K ADT- 1.9 Total Bit Hrs- 43.4 Total Jars- 75.8 MPD Back psi- 0 Control drill @ 82 fph f/ 7,557' t/ 7,706' 7,557.0 7,706.0 5/5/2021 20:00 5/5/2021 21:15 1.25 INTRM1, DRILL OTHR T Lost power f/ high line and put rig in the dark, Power up engines and get power back to rig 7,706.0 7,706.0 5/5/2021 21:15 5/6/2021 00:00 2.75 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 7,706' t/ 7,984' WOB- 15-20K RPM-150 Torq.-15-18K GPM-850 On Btm PSI- 2247 Off Btm PSI- 2150 Flow out- 60% ECD- 10.51 PPG P/U- 235K S/O- 186K Rot- 212K ADT- 2.3 Total Bit Hrs- 45.7 Total Jars- 78.1 MPD Back psi- 0 Control drill @ 82 fph f/ 7,557' t/ 7,765' Control drill @ 164 fph f/ 7,765' t/ 7,984' 7,706.0 7,984.0 Rig: DOYON 25 Page 16/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/6/2021 00:00 5/6/2021 06:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 7,984' t/ 8,616' WOB- 20-25K RPM-150-180 Torq.-15-18K GPM-850 On Btm PSI- 2575 Off Btm PSI- 2460 Flow out- 64% ECD- 10.82 PPG P/U- 250K S/O- 190K Rot- 213K ADT- 5 Total Bit Hrs- 50.7 Total Jars- 83.1 MPD Back psi- 0 Control drill @ 164 fph f/ 7,984' t/ 8,616' 7,984.0 8,616.0 5/6/2021 06:00 5/6/2021 12:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 8,616' t/ 9,258' WOB- 30-35K RPM-150-180 Torq.-18-23K GPM-850 On Btm PSI- 2800 Off Btm PSI- 2675 Flow out- 64% ECD- 11.41 PPG P/U- 276K S/O- 205K Rot- 225K ADT- 4.8 Total Bit Hrs- 55.5 Total Jars- 87.9 MPD Back psi- 0 Control drill @ 164 fph f/ 8,616' t/ 9,258' 8,616.0 9,258.0 5/6/2021 12:00 5/6/2021 18:00 6.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 9,258' t/ 9,794' WOB- 30-35K RPM-150-180 Torq.-18-23K GPM-850 On Btm PSI- 2920 Off Btm PSI- 2900 Flow out- 64% ECD- 11.45 PPG P/U- 295K S/O- 205K Rot- 225239K ADT- 4.8 Total Bit Hrs- 60.3 Total Jars- 92.7 MPD Back psi- 490 Control drill @ 164 fph f/ 9,258' t/ 9,794' 9,258.0 9,794.0 Rig: DOYON 25 Page 17/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/6/2021 18:00 5/6/2021 19:00 1.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 9,794' t/ 9,870' WOB- 25-30K RPM-150-180 Torq.-18-23K GPM-850 On Btm PSI- 2920 Off Btm PSI- 2900 Flow out- 64% ECD- 11.39 PPG P/U- 295K S/O- 205K Rot- 225239K ADT- 1 Total Bit Hrs- 61.3 Total Jars- 93.7 MPD Back psi- 490 Control drill @ 164 fph f/ 9,794' t/ 9,870' 9,794.0 9,870.0 5/6/2021 19:00 5/6/2021 20:30 1.50 INTRM1, DRILL CIRC T Observed drop tendency in stand pipe psi & turbine rpm @ 9,870' Picked up off bottom and performed test t/ determine if there was a washout, test surface equiment, test ok, Bled stand pipe psi t/ 0 and brought psi up on annular w/ MPD and seen standpipe psi equilize t/ annular psi, Pumped out of hole f/ 9,870' t/ 9,560' Pumped down annular with MPD pump and observed flow out drill pipe, suspected wash out in drill pipe. 9,870.0 9,870.0 5/6/2021 20:30 5/6/2021 22:30 2.00 INTRM1, DRILL PMPO T Pump out of the hole f/ 9,560' t/ 8,969' looking f/ wash in drill string 9,870.0 9,870.0 5/6/2021 22:30 5/7/2021 00:00 1.50 INTRM1, DRILL TRIP T TOH on elevators f/ 8,969' t/ 7,571' monitoring fill ups on trip tanks w/ looking f/ wash in drill string 9,870.0 9,870.0 5/7/2021 00:00 5/7/2021 00:15 0.25 INTRM1, DRILL TRIP T TOH on elevators f/ 7,571' t/ 7,461' monitoring fill ups on trip tank w/ looking f/ washout in drill string, Found washout in tube of drill pipe @ 7,461' 7,571.0 7,461.0 5/7/2021 00:15 5/7/2021 00:45 0.50 INTRM1, DRILL OTHR T C/O washed out joint of drill pipe, Circ on string and verify pump psi and turbine rpm, PSI & turbine rpm good 7,461.0 7,461.0 5/7/2021 00:45 5/7/2021 01:15 0.50 INTRM1, DRILL TRIP T TIH on elevators f/ 7,461' t/ 7,555' monitoring returns on trip tank Noticed chunk missing out of hard band, decision made t/ lay joint down 7,461.0 7,555.0 5/7/2021 01:15 5/7/2021 02:45 1.50 INTRM1, DRILL TRIP T TIH on elevators f/ 7,555' t/ 9,630' monitoring returns on trip tank Noticed chunk missing out of hard band, decision made t/ lay joint down 7,555.0 9,630.0 5/7/2021 02:45 5/7/2021 03:00 0.25 INTRM1, DRILL WASH T Wash in hole f/ 9,630' t/ 9,870' GPM- 850 PSI- 3060 9,630.0 9,870.0 Rig: DOYON 25 Page 18/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/7/2021 03:00 5/7/2021 06:00 3.00 INTRM1, DRILL DDRL P Drill 9 7/8'' x 11'' Intermediate Tangent f/ 9,870' t/ 10,055' WOB- 25-30K RPM-150-180 Torq.-18-23K GPM-850 On Btm PSI- 2920 Off Btm PSI- 2900 Flow out- 64% ECD- 11.39 PPG P/U- 295K S/O- 205K Rot- 225239K ADT- 1 Total Bit Hrs- 61.3 Total Jars- 93.7 MPD Back psi- 490 Control drill @ 164 fph f/ 9,870' t/ 10,055' 9,870.0 10,055.0 5/7/2021 06:00 5/7/2021 13:00 7.00 INTRM1, DRILL DDRL P Drilled 9-7/8" X 11" Intermediate hole F/ 10,055' - T/ 10,317' MD – 7,820' TVD, 23 k wob, 850 gpm, 3020 psi, 160 rpm, 16 k tq, 65% flow out, 11.4 ppg ECD, 304 k up wt, 202 k dn wt, 248 k rot wt. ADT = 5.6, total bit hours = 68.9, total jar hours = 101.3 Holding 450 psi back pressure on connections with MPD 10,055.0 10,317.0 5/7/2021 13:00 5/7/2021 14:45 1.75 INTRM1, DRILL RGRP T Observed 300-700 psi loss on standpipe pressure. Troubleshoot and isolate pressure loss to #1 mud pump. Change valve and seat in pod #1 discharge, replace valve springs in all discharge pods. Rotated and reciprocated while troubleshooting and replacing valve. 225 gpm, 675 psi, 10 rpm, 12 k tq, 23% flow out. 10,317.0 10,317.0 5/7/2021 14:45 5/8/2021 00:00 9.25 INTRM1, DRILL DDRL P Drilled 9-7/8" X 11" Intermediate hole F/ 10,317' - T/ 10,950' MD – 8,132' TVD, 23 k wob, 830 gpm, 2750 psi, 160 rpm, 20 k tq, 64% flow out, 11.3 ppg ECD, ADT = 7.9, total bit hours = 76.8, total jar hours = 109.2 Holding 400 psi back pressure on connections with MPD 10,317.0 10,950.0 5/8/2021 00:00 5/8/2021 06:00 6.00 INTRM1, DRILL DDRL P Drilled 9-7/8" X 11" Intermediate hole F/ 10,950' - T/ 11,367' MD – 8,276' TVD, 30 k wob, 850 gpm, 3110 psi, 160 rpm, 19 k tq, 64% flow out, 11.3 ppg ECD, ADT = 4.8, total bit hours = 81.6, total jar hours = 114 Holding 400 psi back pressure on connections with MPD 10,950.0 11,367.0 5/8/2021 06:00 5/8/2021 14:45 8.75 INTRM1, DRILL DDRL P Drilled 9-7/8" X 11" Intermediate hole F/ 11,367' - T/ 11,751' MD – 8,358' TVD, 33 k wob, 850 gpm, 3300 psi, 160 rpm, 20 k tq, 64% flow out, 11.36 ppg ECD, ADT = 7.1, total bit hours = 88.7, total jar hours = 121.1 Holding 375 psi back pressure on connections with MPD 11,367.0 11,751.0 Rig: DOYON 25 Page 19/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/8/2021 14:45 5/8/2021 16:30 1.75 INTRM1, CASING CIRC T Observed 270 bbls/hr loss rate. Decrease flow rate to 160 gpm, 365 psi, 16% flow out. Begin building mud and build 40 bbls 40 ppb LCM pill. 11,751.0 11,751.0 5/8/2021 16:30 5/8/2021 20:00 3.50 INTRM1, CASING CIRC P Pump 40 bbls of 40 ppb LCM pill and circulate 3 bottoms up while rotating and reciprocating F/ 11,751' - T/ 11,700' MD, 825 gpm, 3175 psi, 60% flow out, 50 rpm, 18 k tq, 250 k rot wt. 11,751.0 11,700.0 5/8/2021 20:00 5/8/2021 21:15 1.25 INTRM1, CASING CIRC T After making connection observed 120 bbls/hr loss rate. Reduced flow to 160 gpm and rotated and reciprocated F/ 11,700' - T/ 11,607' MD while building 60 bbls LCM pill. 360 psi, 16% flow out, 18 k tq. 11,700.0 11,700.0 5/8/2021 21:15 5/8/2021 22:30 1.25 INTRM1, CASING CIRC T Pump and spot 60 bbls of 40 ppb LCM pill while pulling out of the hole F/ 11,700' - T/ 11,607' MD. 160 gpm, 365 psi, 16% flow out, 340 k up wt, 175 k dn wt, 250 k rot wt. 11,700.0 11,607.0 5/8/2021 22:30 5/8/2021 23:15 0.75 INTRM1, CASING SMPD P Strip out of the hole F/ 11,607' - T/ 11,329' MD, 342 k up wt, 175 k dn wt. MPD backpressure - 160 psi static, 260 psi pulling. Monitored hole fill on pits 3-5. 11,607.0 11,329.0 5/8/2021 23:15 5/9/2021 00:00 0.75 INTRM1, CASING CIRC P Establish circulation and stage up pumps to 750 gpm, begin rotating and reciprocating F/ 11,329' - T/ 11,238' MD, 2790 psi, 51% flow out, 60 rpm, 14k tq, 11.13 ppg ECD, 250 k rot wt. 11,329.0 11,238.0 5/9/2021 00:00 5/9/2021 06:45 6.75 INTRM1, CASING CIRC P Rotate and reciprocate while circulating and increasing MW to 10.8 ppg. F/ 11,238' - T/ 11,136' MD, 525 gpm, 1410 psi, 24% flow out, 11.3 ppg ECD, 50 rpm, 18k tq, 251 k rot wt. 11,238.0 11,136.0 5/9/2021 06:45 5/9/2021 08:15 1.50 INTRM1, CASING REAM P Drop the 1.625" ball for closing the reamer, 5 rpm, 13 k tq, pump ball down at 250 gpm, 455 psi, 17% flow out. recduce to rate to 100 gpm, 230 psi, 9 % flow out, ball land on seat at 1800 strokes, pressure up to 2130 psi and observe reamer pins shear. Increase pump rate to 785 gpm, 3007 psi, 52% flow out. Function test BOP rams. OWFF static. 11,136.0 11,136.0 5/9/2021 08:15 5/9/2021 09:00 0.75 INTRM1, CASING SMPD P Strip out of the hole F/ 11,136 -T/ 10,973' MD, 375 k up wt, 160 k dn wt, MPD back pressure - 60 psi. Observe poor hole conditions F/ 11,014' - T 10,947' MD 11,136.0 10,973.0 5/9/2021 09:00 5/9/2021 13:00 4.00 INTRM1, CASING REAM P Trip in the hole F/ 10,973' - T/ 11,043' MD, Kelly up and wash and ream F/ 11,043' - T/ 10,947' MD, 550 gpm, 1575 psi, 24% flow out, 11.36 ppg ECD, 30 rpm, 20 k tq. Observe pack off at 10,984' MD. Reduced rate to 100 gpm, 330 psi, 12 % flow out. Pump 2ea 50 bbl LCM pills. 10,973.0 11,043.0 5/9/2021 13:00 5/9/2021 15:00 2.00 INTRM1, CASING WASH P Wash in the hole F/ 11,043' - T/ 11,705' MD, 100 gpm, 280 psi, 30 rpm, 15 k tq. 11,043.0 11,705.0 5/9/2021 15:00 5/9/2021 17:15 2.25 INTRM1, CASING CIRC P Circulate and reciprocate F/11,705' - T/ 11,612' MD, 100 gpm, 280 psi, 30 rpm, 15 k tq. Pump 150 bbls of 40 ppb LCM, 11,705.0 11,705.0 Rig: DOYON 25 Page 20/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/9/2021 17:15 5/9/2021 18:30 1.25 INTRM1, CASING PMPO P Pump out of the hole while laying in LCM F/ 11,705' - T/ 11,046' MD, 180 gpm, 475 psi, 15% flow out, 335 k up wt, 175 k dn wt. 11,705.0 11,046.0 5/9/2021 18:30 5/9/2021 21:30 3.00 INTRM1, CASING OTHR P Squeeze LCM into formation incrementally in 15 min intervals, 240 psi while squeezing, observed pressure fall when pumps off, inital 70 psi, final 140 psi. 11,046.0 11,046.0 5/9/2021 21:30 5/10/2021 00:00 2.50 INTRM1, CASING BKRM P Back ream out of the hole F/ 11,046' - T/ 10,810' MD, 280 gpm, 775 psi, 70 rpm, 14 k tq, 19% flow out, 335k up wt, 185k dn wt, 240k rot wt. 11,046.0 10,810.0 5/10/2021 00:00 5/10/2021 02:15 2.25 INTRM1, CASING BKRM P Back ream out of the hole F/ 10,810' - T/ 10,731' MD, 284 gpm, 716 psi, 70 rpm, 17 k tq, 19% flow out, 249k rot wt. Observe total loss of returns, RIH to 10,855' MD 10,810.0 10,855.0 5/10/2021 02:15 5/10/2021 06:00 3.75 INTRM1, CASING CIRC P Stage up pump rate to 500 gpm, 1528 psi, 25% flow out, 70 rpm, 15k tq, 255 k rot wt. Begin decreasing MW to 10.6 ppg. Circulate bottoms up once at rate while pulling out of the hole F/ 10,855' - T/ 10,760' MD. 500 gpm, 1533 psi, 23% flow out, 70 rpm, 16 k tq. 10,855.0 10,760.0 5/10/2021 06:00 5/10/2021 13:00 7.00 INTRM1, CASING BKRM P Back ream out of the hole F/ 10,760' - T/ 10,244' MD, 500 gpm, 50-70 rpm, 16 k tq, 23% flow out, 253 k rot wt. Observed total loss of returns 10,760.0 10,244.0 5/10/2021 13:00 5/10/2021 18:00 5.00 INTRM1, CASING CIRC T Ream in the hole F/ 10,244' - T/ 10,476' MD, attempt to regain circulation with 52 gpm, 443 psi, 20 rpm, 17 k tq, 245 k rot wt. 10,244.0 10,476.0 5/10/2021 18:00 5/10/2021 19:00 1.00 INTRM1, CASING CIRC T Shut off pumps to relax pack off, pump across the top of the hole to monitor well. observed well began to breath back. Monitor and observe deminishing returns. Stage up pumps to 60 gpm with full returns, 250 psi, 20 rpm, 16 k tq. 10,476.0 10,476.0 5/10/2021 19:00 5/10/2021 20:15 1.25 INTRM1, CASING BKRM P Continue staging up pump rate and begin back reaming out of the hole F/ 10,476' - T/ 10,382' MD, 340 gpm, 830 psi, 20 % flow out, 20 rpm, 16 k tq, 10,476.0 10,382.0 5/10/2021 20:15 5/11/2021 00:00 3.75 INTRM1, CASING BKRM P Attempt to SOOH. Backream out of the hole F/ 10,382' - T/ 10,193' MD, 450 gpm, 1190 psi, 20 % flow out, 20 rpm, 16 k tq, 253 k rot wt. 10,382.0 10,193.0 5/11/2021 00:00 5/11/2021 12:00 12.00 INTRM1, CASING BKRM P Backream out of the hole F/ 10,193' - T/ 9,342' MD, 450 gpm, 1310 psi, 20 % flow out, 80 rpm, 16 k tq, 238 k rot wt. Pull speed ranging from 25 to 225 fph as hole conditions dictate. 10,193.0 9,342.0 5/11/2021 12:00 5/11/2021 15:00 3.00 INTRM1, CASING BKRM P Backream out of the hole F/ 9,342' - T/ 9,060' MD, 600 gpm, 2000 psi, 28 % flow out, 80 rpm, 15 k tq, 235 k rot wt. 9,342.0 9,060.0 5/11/2021 15:00 5/11/2021 17:30 2.50 INTRM1, CASING CIRC P Rotate and reciprocate while circulating 2 bottoms up F/ 9,060' - T/ 8,968' MD, 700 gpm, 2560 psi, 40% flow out, 80 rpm, 15 k tq, 335k up wt, 150 k dn wt, 240 k rot wt. 9,060.0 8,968.0 5/11/2021 17:30 5/11/2021 18:00 0.50 INTRM1, CASING SMPD P Strip out of the hole F/ 8,968' - T/ 8,830' MD, encountered obstruction, attempt to work through with 45 k over pull. Run in the hole to 8,872' MD. 8,968.0 8,872.0 Rig: DOYON 25 Page 21/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/11/2021 18:00 5/11/2021 22:30 4.50 INTRM1, CASING CIRC P Pump 2 sweeps while circulating 3 bottoms up racking back 1 stand per bottoms up F/ 8,872' - T/ 8,493' MD, 700 gpm, 2560 psi, 40% flow out, 80 rpm, 15k tq, 335 k up wt, 150 k dn wt, 240 k dn wt. 8,872.0 8,493.0 5/11/2021 22:30 5/11/2021 23:30 1.00 INTRM1, CASING SMPD P Strip out of the hole F/ 8,493' - T/ 8,104' MD, 310 k up wt, 155 k dn wt. Holding 100 psi back pressure with MPD while pulling. Encountered obstruction at 8,104' MD attempt to work through with 65 k overpull 8,493.0 8,104.0 5/11/2021 23:30 5/12/2021 00:00 0.50 INTRM1, CASING BKRM P Backream out of the hole F/ 8,104' - T/ 8,088' MD, 700 gpm, 2850 psi, 44% flow out, 80 rpm, 15 k tq, 240 k rot wt. 8,104.0 8,088.0 5/12/2021 00:00 5/12/2021 06:00 6.00 INTRM1, CASING BKRM P Backream out of the hole F/ 8,088' - T/ 7,548' MD, 650 gpm, 2260 psi, 35% flow out, 80 rpm, 12 k tq, 210 k rot wt. 8,088.0 7,548.0 5/12/2021 06:00 5/12/2021 10:30 4.50 INTRM1, CASING CIRC P Circulate 3 bottoms up while racking back 1 stand per bottoms up F/7,548' - T/ 7,274' MD, 750 gpm, 2850 psi, 130 rpm, 12 k tq, 49 % flow out, 204 k rot wt. Pumped 3 sweeps, 50 bbls 40 ppb nut plug, 80 bbls fresh mud, 50 bbls 12.6 ppg wt sweep. 7,548.0 7,274.0 5/12/2021 10:30 5/12/2021 15:30 5.00 INTRM1, CASING BKRM P Attempt to SOOH, Continue backreaming out of the hole F/ 7,274' - T/ 6,717' MD, 750 gpm, 2850 psi, 130 rpm, 12 k tq, 49% flow out, 197 k rot wt. Observed signs of packoff at 6,717' MD 7,274.0 6,717.0 5/12/2021 15:30 5/12/2021 16:45 1.25 INTRM1, CASING OTHR P Turn off pumps and lower RPM to 10, work pipe down F/ 6,717' - T/ 6,787' MD, free pack off and allow well to breath back, monitor returns, 64 bbls returned to the pits. 6,717.0 6,787.0 5/12/2021 16:45 5/12/2021 17:15 0.50 INTRM1, CASING OWFF P Observe well for flow - Static 6,787.0 6,787.0 5/12/2021 17:15 5/12/2021 22:00 4.75 INTRM1, CASING SMPD P Strip out of the hole F/ 6,787' - T/ 3,306' MD holding 50 psi back pressure with MPD. 145 k up wt, 125 k dn wt. Slowed pulling speed for BHA entering the shoe 6,787.0 3,306.0 5/12/2021 22:00 5/12/2021 22:30 0.50 INTRM1, CASING OWFF P Observe well for flow - static 3,306.0 3,306.0 5/12/2021 22:30 5/12/2021 23:30 1.00 INTRM1, CASING MPDA P Pull the RCD and install the trip nipple. 3,306.0 3,306.0 5/12/2021 23:30 5/13/2021 00:00 0.50 INTRM1, CASING TRIP P Trip out of the hole F/ 3,306' - T/ 3,023' MD. 136 k up wt, 134 k dn wt. Monitor hole fill on pit 4. 3,306.0 3,023.0 5/13/2021 00:00 5/13/2021 01:15 1.25 INTRM1, CASING TRIP P Trip out of the hole F/ 3,023' - T/ 580' MD. 70 k up wt, 70 k dn wt. Monitor hole fill on trip tank. 3,023.0 580.0 5/13/2021 01:15 5/13/2021 04:00 2.75 INTRM1, CASING BHAH P LD BHA #3 F/ 580' per Baker DD and MWD. 580.0 0.0 5/13/2021 04:00 5/13/2021 05:30 1.50 INTRM1, CASING WWWH P Clean and clear the rig floor of BHA equipment and tools, make up stack washing tool to stand of drill pipe and flush the BOP stack, 850 gpm, 50 psi, 7 rpm. Lay down washing tool, blow down top drive. 0.0 0.0 Rig: DOYON 25 Page 22/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/13/2021 05:30 5/13/2021 06:00 0.50 INTRM1, CASING MPSP P Pull the wear bushing and make up test plug to 7-5/8" test joint while expediting casing equipment to the rig floor. 0.0 0.0 5/13/2021 06:00 5/13/2021 06:30 0.50 INTRM1, CASING OTHR P Change upper rams to 7-5/8" Solid body rams 0.0 0.0 5/13/2021 06:30 5/13/2021 07:00 0.50 INTRM1, CASING OTHR P Install test plug per FMC rep. Flood lines / stack with water. Shell test BOP t0 500 psi low / 3500 psi high - good 0.0 0.0 5/13/2021 07:00 5/13/2021 08:00 1.00 INTRM1, CASING BOPE P Against 7-5/8" test joint, test annular to 250 psi for 5 charted min and 3000 psi for 10 charted minutes - Good. Tested upper 7-5/8" rams to 500 psi for 5 charted min and 3500 psi for 10 charted minutes - Good. 0.0 0.0 5/13/2021 08:00 5/13/2021 08:15 0.25 INTRM1, CASING OTHR P Pull test joint / plug. Rig down / Blow down equipment while simops prep to cut and slip drill line. 0.0 0.0 5/13/2021 08:15 5/13/2021 09:30 1.25 INTRM1, CASING SLPC P Cut and slip 94' 1.375" drill line while monitoring well bore via hole fill. Simops - calibrate Amphion & Pason systems. 0.0 0.0 5/13/2021 09:30 5/13/2021 10:30 1.00 INTRM1, CASING RURD P Rig up to run 7.625" intermediate casing. MU Volant casing running tool to top drive as per Doyon casing rep. Rig up fill up hose. Instal 7.625" PS-21 slip inserts and elivators. Make up FOSV to XO. PJSM prior to picking up casing. 0.0 0.0 5/13/2021 10:30 5/13/2021 12:00 1.50 INTRM1, CASING PUTB P Make up casing shoe track with baker lok and check floats - good. Verified torque of 33.7 #/ft casing to 23.5 ft/lbs. 0.0 130.0 5/13/2021 12:00 5/13/2021 16:15 4.25 INTRM1, CASING PUTB P Run 7.625" 33.7# L-80 TXP intermediate casing per running tally from 130' to 3,365' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 5. PU Wt 154 k lbs, SO Wt 152k lbs. 130.0 3,365.0 5/13/2021 16:15 5/13/2021 17:45 1.50 INTRM1, CASING PUTB P Circulate while reciprocating from 3,329' - 3,365' MD. Stage pumps up to 6 bpm. @ 6 bpm, SPP 98 psi, Flow out 16%. PU Wt 156 k lbs, SO Wt 152 k lbs. Total pumped = 4122 strokes 3,365.0 3,365.0 5/13/2021 17:45 5/13/2021 20:30 2.75 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 3,365' to 5,135' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 5. PU Wt 175 k lbs, SO Wt 170k lbs. 3,365.0 5,135.0 5/13/2021 20:30 5/13/2021 21:15 0.75 INTRM1, CASING PUTB P Circulate while reciprocating from 3,135' - 5,105' MD. Stage pumps up to 3 bpm. @ 3 bpm, SPP 110 psi, Flow out 16%. PU Wt 156 k lbs, SO Wt 152 k lbs. Total pumped = 1000 strokes 5,135.0 5,135.0 5/13/2021 21:15 5/13/2021 22:15 1.00 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 5,135' to 5,783' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 5. PU Wt 185 k lbs, SO Wt 169k lbs. 5,135.0 5,783.0 Rig: DOYON 25 Page 23/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/13/2021 22:15 5/14/2021 00:00 1.75 INTRM1, CASING PUTB P Circulate while reciprocating from 5,783' - 5,815' MD. Stage pumps up to 6 bpm. @ 4 bpm, SPP 295 psi, Flow out 14%. PU Wt 224 k lbs, SO Wt 178 k lbs. * losses for tour 23 bbls 5,783.0 5,783.0 5/14/2021 00:00 5/14/2021 01:45 1.75 INTRM1, CASING CIRC P Continue to circulate while reciprocating from 5,783' - 5,815' MD. Stage pumps up to 6 bpm. @ 6 bpm, SPP fell from 290 to 195 psi, Flow out 18%. PU Wt 233 k lbs, SO Wt 180 k lbs. Total strokes = 7042 strokes MW out at 11.0 ppg during circulation, MW out 10.7 ppg after circulation 5,783.0 5,783.0 5/14/2021 01:45 5/14/2021 05:45 4.00 INTRM1, CASING PUTB P Continue to run 7.625" intermediate casing per running tally from 5,815' to 7,911' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 5. PU Wt 305k lbs, SO Wt 193 k lbs. 5,783.0 7,911.0 5/14/2021 05:45 5/14/2021 11:00 5.25 INTRM1, CASING CIRC P Circulate bottoms up while reciprocating from 7,911' - 7,951' MD, stage up pumps to 6 bpm, 240 psi, 20% flow out, PU Wt 320k lbs, SO Wt 197 k lbs. Total strokes = 13562 MW out climbed to 11.2 ppg, MW out 10.7 ppg after circulation 7,911.0 7,951.0 5/14/2021 11:00 5/14/2021 13:45 2.75 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 7,951' to 9,624' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 2. PU Wt 380 k lbs, SO Wt 220 k lbs. 7,951.0 9,624.0 5/14/2021 13:45 5/14/2021 16:45 3.00 INTRM1, CASING CIRC P Circulate bottoms up while reciprocating from 9,624' - 9,660' MD, stage up pumps to 6 bpm in .5 bpm increments, 240 psi, 20% flow out, PU Wt 320k lbs, SO Wt 197 k lbs. Total strokes = 7163 MW out climbed to 11.2 ppg, MW out 10.7 ppg after circulation 9,624.0 9,660.0 5/14/2021 16:45 5/15/2021 00:00 7.25 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 9,660' to 11,323 ' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 2. PU Wt 475 k lbs, SO Wt 120 k lbs. Worked pipe in the hole from 10,980' - 11,284 MD. Began slowly slacking off targeting no less than 120 k SO Wt. adjusting running speed as needed from 11,284' - 11,323' MD 9,660.0 11,323.0 5/15/2021 00:00 5/15/2021 06:00 6.00 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 11,323' to 11,528' MD. Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 2. SO Wt 120 k lbs. 11,323.0 11,528.0 Rig: DOYON 25 Page 24/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/15/2021 06:00 5/15/2021 13:00 7.00 INTRM1, CASING PUTB P Continue to run 7.625" 33.7 x 29.7# L- 80 TXP x HYD563 intermediate casing per running tally from 11,528' to 11,707' MD. Pick up and make up hanger and landing joint, run in hole and land hanger, Filling pipe on the fly and topping off every 10 joints while monitoring displacement on pit 2. SO Wt 100 k lbs. 11,528.0 11,741.0 5/15/2021 13:00 5/15/2021 18:00 5.00 INTRM1, CEMENT CIRC P Stage pumps up to 4 bbls/min at .5 bbl/min increments, 455 psi, 14 % flow out. 11,741.0 11,741.0 5/15/2021 18:00 5/16/2021 00:00 6.00 INTRM1, CEMENT CIRC T Observed signs of pack off, decrease flow rate to .5 bbls/min. regain circulation. stage pumps up to 2.5 bbls/min, 337 psi, pressure began to rise, shut off pumps, work pipe and observe pressure loss, stage up pumps to 1 bbl/min, 250 psi. 11,741.0 11,741.0 5/16/2021 00:00 5/16/2021 06:00 6.00 INTRM1, CEMENT CIRC T Continue to regain circulation and condition mud for cement job through top drive. Worked pipe (stretched), while establishing circulation by increasing pump rate 0.5 bpm or less as hole dictates while targeting 20-25 YP and 5-8 LSYP. * SimOps - Finished processing 4" DP in casing shed 0.5 bpm = 179 psi 1.0 bpm = 352 psi 1.2 bpm = 370 psi 11,741.0 11,741.0 5/16/2021 06:00 5/16/2021 12:00 6.00 INTRM1, CEMENT CIRC T Continue to regain circulation and condition mud for cement job through top drive. Establish circulation by increasing pump rate 0.5 bpm or less as hole dictates every 30 minutes up to 1.5 bpm while targeting 20-25 YP and 5-8 LSYP. * SimOps - LD 5" drill pipe in mouse hole 0.5 bpm = 187 psi 1.0 bpm = 365 psi 1.5 bpm = 435 psi 11,741.0 11,741.0 5/16/2021 12:00 5/16/2021 12:45 0.75 INTRM1, CEMENT CIRC T Continue to regain circulation and condition mud for cement job through top drive. Establish circulation by increasing pump rate 0.5 bpm or less as hole dictates up to 1.5 bpm while targeting 20-25 YP and 5-8 LSYP. * SimOps - LD 5" drill pipe in mouse hole 0.5 bpm = 187 psi 1.0 bpm = 365 psi 1.5 bpm = 435 psi 11,741.0 11,741.0 5/16/2021 12:45 5/16/2021 13:15 0.50 INTRM1, CEMENT CIRC P Blow down top drive and rig up cement line to the Volant. 11,741.0 11,741.0 Rig: DOYON 25 Page 25/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/16/2021 13:15 5/16/2021 16:30 3.25 INTRM1, CEMENT CIRC P Continue to regain circulation and condition mud for cement job through cement line. Establish circulation by increasing pump rate 0.5 bpm or less as hole dictates up to 1 bpm while targeting 20-25 YP and 5-8 LSYP. * SimOps - LD 5" drill pipe in mouse hole * PJSM with rig crew and SLB cementers 0.5 bpm = 190 psi 1.0 bpm = 276 psi 11,741.0 11,741.0 5/16/2021 16:30 5/17/2021 00:00 7.50 INTRM1, CEMENT CMNT P SLB pump 5 bbls of fresh H2O. Tested lines to 735 psi low/ 4350 psi high, pump 60 bbls of 11.5 ppg Mud Push II @ 1 bbls/min, 460 psi, Dropped bottom plug. (cement wet @ 18:00) Pump 75 bbls of Class G 15.8 ppg cement @ 1 bbls/min, ICP = 300 psi, FCP = 40 psi. Drop top plug & kick out with 20 bbls of fresh H2O. Swap to rig & displace w/ 10.4 ppg LSND mud @ 1 bbls/min, 48 psi. 11,741.0 11,741.0 5/17/2021 00:00 5/17/2021 04:00 4.00 INTRM1, CEMENT CMNT P Continue to displaced cement with LSND mud at 1 bbl/min. Begin observing losses at 3588 strokes, Total losses 98 bbls, 5110 strokes. Did not observe bottom plug land. Bleed off pressure, shut in casing and annulus and monitor pressures, CIP 03:38 Hrs 02/18/2021. 11,741.0 0.0 5/17/2021 04:00 5/17/2021 18:00 14.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus climbed to 217 psi. casing climbed to 398 psi. Simops- change glass panes on drillers cabin and reinstall computers/monitors. Prepare 4" testing equipment for BOP test, LD remaining 5" drillpipe in the derrick, change auger gearbox in the pits, service the crown, topdrive, iron roughneck, 0.0 0.0 5/17/2021 18:00 5/18/2021 00:00 6.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing at 368 psi. Simops - make up stands of 4" DP and rack back in the derrick, continue to change auger gear box in the pits, clean out high pressure discharge screen on #2 mud pump. 0.0 0.0 5/18/2021 00:00 5/18/2021 06:00 6.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing - 339 psi. Simops - continue make up stands of 4" DP and rack back in the derrick, finish changing auger gear box in the pits, clean pits. 0.0 0.0 5/18/2021 06:00 5/18/2021 12:00 6.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing - 328 psi. Simops - continue make up stands of 4" DP and rack back in the derrick, performed weekly derrick inspection, service Topdrive electrical system. 0.0 0.0 5/18/2021 12:00 5/18/2021 18:00 6.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing - 315 psi. Simops - continue make up stands of 4" DP and rack back in the derrick, misc. painting, repair vac line supports. 0.0 0.0 Rig: DOYON 25 Page 26/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/18/2021 18:00 5/19/2021 00:00 6.00 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing - 315 psi. Simops - continue make up stands of 4" DP and rack back in the derrick, misc. painting, perform maintainence on the pit agitators and mud pumps. 0.0 0.0 5/19/2021 00:00 5/19/2021 02:30 2.50 INTRM1, CEMENT WOC T Continue to monitor pressures, annulus - 50 psi. casing - 275 psi. Simops - continue make up stands of 4" DP and rack back in the derrick, misc. painting, continue to perform maintainence on the pit agitators. 0.0 0.0 5/19/2021 02:30 5/19/2021 08:00 5.50 INTRM1, CEMENT OWFF P Bleed off pressure on the annulus, observe no returns, bleed off pressure on the casing in stages. Open annular preventor and monitor well. 2.1 bbls returns observed. 0.0 0.0 5/19/2021 08:00 5/19/2021 08:45 0.75 INTRM1, CEMENT RURD P Rig down cementing and casing running equipment, back out and lay down 7- 5/8" landing joint. 0.0 0.0 5/19/2021 08:45 5/19/2021 10:00 1.25 INTRM1, CEMENT WWSP P Drain the BOP stack, set 7-5/8" packoff per FMC. Test packoff to 5000 psi for 10 min. (good test) 0.0 0.0 5/19/2021 10:00 5/19/2021 10:30 0.50 INTRM1, CEMENT OTHR P Pick up and install the test plug per FMC. 0.0 0.0 5/19/2021 10:30 5/19/2021 12:00 1.50 INTRM1, WHDBOP OTHR P Change the top drive saver sub to XT-39 Simops - changes upper rams to 2-7/8" x 5-1/2" VBR's 0.0 0.0 5/19/2021 12:00 5/19/2021 17:00 5.00 INTRM1, WHDBOP BOPE P Rig up and to test BOPE and purge air out of the system. Test BOPE all tests 250psi low for 5 min, 3,500psi high for 10 minutes each with exception of manual and super chokes tested to 2,000psi. With 4" and 4 ½” test joint - test annular and 2 7/8" x 5 1/2" UPR and LPR, test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, 5" dart valve, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=2950 psi, manifold=1550psi initial. After all functions, accumulator=1600 psi, 15 secs to 200 psi with two electric pumps, 97 secs to build to full system pressure with two electric and two air pumps. Closing times, annular=23secs, UPR=18secs, blind/shears=16secs, LPR=16 secs, choke HCR=2 secs, kill HCR=2secs. 6 Nitrogen bottles back-up avg=1908psi, CPAI witnessed. Tested PVT, gain/loss, flow out, LEL and H2S alarms. Test witnessed waived by AOGCC Guy Cook at 14:00 hrs 5-15- 2021. 0.0 0.0 5/19/2021 17:00 5/19/2021 18:00 1.00 INTRM1, WHDBOP RURD P Pull the test plug per FMC rep, rig down and blow down BOP testing equipment. 0.0 0.0 5/19/2021 18:00 5/19/2021 19:30 1.50 INTRM1, CEMENT BHAH T Pick up BHA #4 per Baker and SLB to 223' MD. 0.0 223.0 5/19/2021 19:30 5/20/2021 00:00 4.50 INTRM1, CEMENT TRIP T Trip in the hole with BHA #4 from 223' - 5,989' MD, 136 k Up Wt, 88 k So Wt, Monitor displacement on pit #8, fill pipe every 20 stands. Free ring pipe per SLB LWD rep from 5,443' - 5,535' MD at 1750 ft/hr. 223.0 5,989.0 Rig: DOYON 25 Page 27/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/20/2021 00:00 5/20/2021 01:30 1.50 INTRM1, CEMENT TRIP T Continue trip in the hole with BHA #4 from 5,989' - 8,955' MD, 165 k Up Wt, 120k So Wt, monitor displacement on pit #8, fill pipe every 20 stands. 5,989.0 8,955.0 5/20/2021 01:30 5/20/2021 04:00 2.50 INTRM1, CEMENT DLOG T Log with SonicScope per SLB LWD rep at 1750 ft/hr from 8,955' - 11,245' MD. 236 k Up Wt, 145 k So Wt. Tag cement with 10 k WOB at 11,245’ MD. 8,955.0 11,245.0 5/20/2021 04:00 5/20/2021 04:30 0.50 INTRM1, CEMENT WASH T Pick up to 11,233' MD, break circulation and wash in hole and tag at 11,245' MD with 10 k WOB, 275 gpm, 1500 psi. 11,245.0 11,245.0 5/20/2021 04:30 5/20/2021 05:30 1.00 INTRM1, CEMENT CIRC T Pick up to 11,230' MD, circulate surface to surface at 275 gpm, 1430 psi. Discuss plan forward with town. 11,245.0 11,230.0 5/20/2021 05:30 5/20/2021 08:00 2.50 INTRM1, CEMENT RURD T Rack back stand and rig up to test casing. Attempt to test casing, pressure began falling after reaching 2800 psi, observed pressure fall to 780 psi and stabilize. 11,230.0 11,230.0 5/20/2021 08:00 5/20/2021 12:30 4.50 INTRM1, CEMENT DRLG T Make up stand and drill cement, plugs, and float collar from 11,245' - 11,706' MD, 225 - 325 gpm, 1065- 1900 psi, 60 rpm, 5 k wob, 13k tq, 218 k Up Wt, 150 k So Wt, 184 k Rot Wt, Locate plugs at 11,370' MD, locate float collar at 11,650' MD. Begin reducing mud wt to 10 ppg. 11,230.0 11,706.0 5/20/2021 12:30 5/20/2021 14:00 1.50 INTRM1, CEMENT CIRC T Circulate and condition mud at 11,706' MD, 228 gpm, 1110 psi, 14 % flow out, 60 rpm, 14 k tq. 11,706.0 11,706.0 5/20/2021 14:00 5/20/2021 14:30 0.50 INTRM1, CEMENT DRLG T Continue to drill/wash cement from 11,706' - 11,736' MD, 225 gpm, 1070 psi, 14 % flow out, 60 rpm, 14 k tq. Tag shoe at 11,736' MD 11,706.0 11,736.0 5/20/2021 14:30 5/20/2021 15:30 1.00 INTRM1, CEMENT CIRC T Circulate and condition mud, MW in/out 10 ppg, 228 gpm, 1010 psi, 14% flow out, 60 rpm. 15 k tq, 256 k Up Wt, 145 k So Wt, 183 k Rot Wt. Rack back stand. 11,736.0 11,706.0 5/20/2021 15:30 5/20/2021 17:00 1.50 INTRM1, CEMENT FIT T Rig to perform FIT, purge lines, perform FIT to 11.0 ppg EMW, bleed off pressure, 1 bbl bled back. blow down, rig down testing equipment. 11,706.0 11,706.0 5/20/2021 17:00 5/20/2021 17:30 0.50 INTRM1, CEMENT CIRC T Run in hole and tag shoe at 11,736' MD. Pump 20 bbls dry job, 129 gpm, 420 psi, 7 % flow out, blow down top drive. 11,706.0 11,736.0 5/20/2021 17:30 5/20/2021 22:30 5.00 INTRM1, CEMENT TRIP T Trip out of the hole from 11,736' MD - 223' MD, monitor displacement on pit #3. Log out of the hole at 1750 ft/hr from 11,736' - 11,234' MD. 11,736.0 223.0 5/20/2021 22:30 5/20/2021 23:00 0.50 INTRM1, CEMENT OWFF T Observe well for flow - static 223.0 223.0 5/20/2021 23:00 5/21/2021 00:00 1.00 INTRM1, CEMENT BHAH T Lay down BHA #4 per Baker DD and SLB LWD reps. Clear and clean rig floor of BHA components. Begin downloading Sonic tool. 223.0 0.0 5/21/2021 00:00 5/21/2021 06:00 6.00 INTRM1, CEMENT DLOG T Continue downloading Sonic tool, send logs in for processing. Simops - Change wear pads on the top drive rails, adjust link tilt clamps, inspect and service the PS-21's service topdrive and blocks, work on scheduled maintenance. 0.0 0.0 Rig: DOYON 25 Page 28/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/21/2021 06:00 5/21/2021 13:30 7.50 INTRM1, CEMENT TRIP T Pick up 6-1/4" Baker inflatable injection packer, trip in the hole to 11,653' MD at 90 ft/min. 275 k Up Wt, 134 k So Wt. Monitor displacement on pit #3. Acquire circulating parameters, 82 gpm, 325 psi, 2% flow out. 0.0 11,653.0 5/21/2021 13:30 5/21/2021 16:00 2.50 INTRM1, CEMENT PACK T Drop ball down the drill pipe and let fall for 45 min, pump ball on seat, 82 gpm, 325 psi, 2% flow out, ball on seat at 706 stks, increase pressure in 500 psi increments, waiting 10 min between each stage. Observe catcher shear at 3250 psi. slack off and set 4 k on packer to confirm set. 11,653.0 11,653.0 5/21/2021 16:00 5/21/2021 17:30 1.50 INTRM1, CEMENT PRTS T Rig up to test casing, purge air from lines, test casing to 3500 psi for 30 min (good test). Blow down and rig down testing equipment. 11,653.0 11,653.0 5/21/2021 17:30 5/21/2021 18:00 0.50 INTRM1, CEMENT PACK T Release packer per Baker rep, rotate 11 turns to the right. Pick up and confirm release. 275 k Up Wt. 11,653.0 11,653.0 5/21/2021 18:00 5/21/2021 22:30 4.50 INTRM1, CEMENT TRIP T Trip out of the hole from 11,653' - surface, lay down Baker inflatable injection packer. 11,653.0 0.0 5/21/2021 22:30 5/22/2021 00:00 1.50 INTRM1, DRILLOUT BHAH P Pick up BHA per Baker DD and MWD to 150' MD 0.0 150.0 5/22/2021 00:00 5/22/2021 03:00 3.00 INTRM1, DRILLOUT BHAH P Continue picking up 6.5" drilling BHA per Baker DD and MWD from 150' - 338' MD. 65 k Up Wt, 65 k So Wt. 150.0 338.0 5/22/2021 03:00 5/22/2021 09:30 6.50 INTRM1, DRILLOUT TRIP P Trip in the hole with 6.5" drilling BHA from 338' - 11,250' MD, filling pipe and collecting T&D every 20 stands, 252 k Up Wt, 145 k So Wt, 187 k Rot Wt. Shallow hole tested at 2,237' MD, 275 gpm, 1491 psi, 20 % flow out. (good test) 338.0 11,250.0 5/22/2021 09:30 5/22/2021 10:30 1.00 INTRM1, DRILLOUT SLPC P Slip and cut 79 ft of drilling line. Calibrate Pason, Amphion and Baker systems. 11,250.0 11,250.0 5/22/2021 10:30 5/22/2021 11:00 0.50 INTRM1, DRILLOUT TRIP P Continue trip in the hole with 6.5" drilling BHA from 11,250' - 11,634' MD, 268 k Up Wt, 138 k So Wt. 11,250.0 11,634.0 5/22/2021 11:00 5/22/2021 13:30 2.50 INTRM1, DRILLOUT DRLG P Wash and ream from 11,634' - 11,733' MD, drill shoe and 20 ft of new hole to 11,771' MD, 5-10 k wob, 225 gpm, 1600 psi, 15% flow out, 60 rpm, 16 k tq, 270 k Up Wt, 137 k So Wt, 195 k Rot wt. 11,634.0 11,771.0 5/22/2021 13:30 5/22/2021 14:45 1.25 INTRM1, DRILLOUT CIRC P Circulate bottoms up, 9.95 ppg in and out, 225 gpm, 1610 psi, 14 % flow out, 60 rpm, 15 k tq, 10.45 ppg ECD. 11,771.0 11,771.0 5/22/2021 14:45 5/22/2021 16:15 1.50 INTRM1, DRILLOUT FIT P Rack back stand, rig up for FIT and purge lines. FIT 7-5/8" intermediate casing shoe to 11 ppg EMW, rig down testing equipment. 11,771.0 11,771.0 5/22/2021 16:15 5/22/2021 17:00 0.75 INTRM1, DRILLOUT MPDA P Pull the trip nipple and install the RCD per MPD rep. Simops - perfrom annlar injection test, begin freeze protecting 7-5/8" x 13-3/8" annulus 11,771.0 11,771.0 Rig: DOYON 25 Page 29/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/22/2021 17:00 5/23/2021 00:00 7.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 11,771' - 12,025' MD, 8,398' TVD, 15 k wob, 271 gpm, 1720 psi, 14% flow out, 125 rpm, 8 k tq, 9.64 ppg ECD, 270 k Up Wt, 137 k So Wt, 195 k Rot Wt. ADT = 5.5, total bit hrs = 5.5 Displace to 9.0 ppg FloPro while drilling. Control drilling at 50 ft/hr for LWD data density 11,771.0 12,025.0 5/23/2021 00:00 5/23/2021 05:45 5.75 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,025' - 12,248' MD, 8,416' TVD, 15 k wob, 275 gpm, 1770 psi, 14% flow out, 125 rpm, 7 k tq, 9.68 ppg ECD, 224 k Up Wt, 165 k So Wt, 187 k Rot Wt. ADT = 5.1, total bit hrs = 10.6 Holding 210 psi back pressure with MPD on connections. Control drilling at 50 ft/hr for LWD data density 12,025.0 12,248.0 5/23/2021 05:45 5/23/2021 06:15 0.50 PROD1, DRILL RGRP T Lost power on the rig, put rig on generator power and restarted all rig systems. MPD system auto closed when power went down. 12,248.0 12,248.0 5/23/2021 06:15 5/23/2021 12:00 5.75 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,248' - 12,412' MD, 8,398' TVD, 15 k wob, 275 gpm, 1785 psi, 14% flow out, 120 rpm, 7 k tq, 9.66 ppg ECD, 224 k Up Wt, 168 k So Wt, 184 k Rot Wt. ADT = 3.8, total bit hrs = 14.4 Control drilling at 50 ft/hr for LWD data density 12,248.0 12,412.0 5/23/2021 12:00 5/23/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,412' - 12,655' MD, 8,440' TVD, 13 k wob, 275 gpm, 1880 psi, 14% flow out, 120 rpm, 7 k tq, 9.67 ppg ECD, 220 k Up Wt, 170k So Wt, 188 k Rot Wt. ADT = 5.4, total bit hrs = 19.8 Control drilling at 50 ft/hr for LWD data density 12,412.0 12,655.0 5/23/2021 18:00 5/24/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,655' - 12,888' MD, 8,458' TVD, 13 k wob, 275 gpm, 1790 psi, 14% flow out, 120 rpm, 7 k tq, 9.63 ppg ECD, 220 k Up Wt, 158k So Wt, 192 k Rot Wt. ADT = 5.1, total bit hrs = 24.8 Control drilling at 50 ft/hr for LWD data density 12,655.0 12,888.0 5/24/2021 00:00 5/24/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 12,888' - 13,138' MD, 8,450' TVD, 10 k wob, 275 gpm, 1890 psi, 15% flow out, 120 rpm, 7.5 k tq, 9.78 ppg ECD, 218 k Up Wt, 167k So Wt, 186 k Rot Wt. ADT = 4.2, total bit hrs = 29 At 13,000' MD increased control drilling speed to 100 ft/hr.c 12,888.0 13,138.0 Rig: DOYON 25 Page 30/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/24/2021 06:00 5/24/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,138' - 13,486' MD, 8,461' TVD, 10 k wob, 275 gpm, 2120 psi, 15% flow out, 120 rpm, 8 k tq, 9.82 ppg ECD, 220 k Up Wt, 160k So Wt, 192 k Rot Wt. ADT = 4.3, total bit hrs = 33.3 Control drilling at 100 ft/hr. 13,138.0 13,486.0 5/24/2021 12:00 5/24/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,438' - 13,950' MD, 8,461' TVD, 14 k wob, 275 gpm, 2100 psi, 15% flow out, 120 rpm, 8 k tq, 9.89 ppg ECD, 220 k Up Wt, 160k So Wt, 192 k Rot Wt. ADT = 4.9, total bit hrs = 38.2 Control drilling at 100 ft/hr. 13,486.0 13,950.0 5/24/2021 18:00 5/25/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 13,950' - 14,414' MD, 8,474' TVD, 10 k wob, 275 gpm, 2260 psi, 16% flow out, 120 rpm, 8 k tq, 9.90 ppg ECD, 217 k Up Wt, 165k So Wt, 194 k Rot Wt. ADT = 4.6, total bit hrs = 42.8 Control drilling at 100 ft/hr. 13,950.0 14,414.0 5/25/2021 00:00 5/25/2021 04:30 4.50 PROD1, DRILL DDRL P Drill 6.5" production hole from 14,414' - 14,763' MD, 8,475' TVD, 13 k wob, 275 gpm, 2415 psi, 16% flow out, 100 rpm, 9 k tq, 9.92 ppg ECD, 219 k Up Wt, 167k So Wt, 184 k Rot Wt. ADT = 4.8, total bit hrs = 47.6 Control drilling at 100 ft/hr. 14,414.0 14,763.0 5/25/2021 04:30 5/25/2021 05:00 0.50 PROD1, DRILL CIRC P Observed gamma ray sensor spike, stopped drilling and consulted with town geologist while circulating a bottoms up, 275 gpm, 2400 psi, 11.5% flow out, 9.9 ppg ECD, 40 rpm, 6.5 k tq. Determined gamma was due to the Alpine C was pinching and the gamma spike was from the Alpine D. Resumed drilling operations. 14,763.0 14,763.0 5/25/2021 05:00 5/25/2021 12:00 7.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 14,763' - 15,262' MD, 8,489' TVD, 13 k wob, 275 gpm, 2460 psi, 16% flow out, 120 rpm, 10 k tq, 10.03 ppg ECD, 220 k Up Wt, 153k So Wt, 184 k Rot Wt. ADT = 5, total bit hrs = 52.6 Control drilling at 100 ft/hr. 14,763.0 15,262.0 5/25/2021 12:00 5/25/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 15,262' - 15,712' MD, 8,484' TVD, 10 k wob, 275 gpm, 2290 psi, 16% flow out, 120 rpm, 10 k tq, 9.94 ppg ECD, 226 k Up Wt, 151k So Wt, 190 k Rot Wt. ADT = 4.9, total bit hrs = 57.5 Control drilling at 100 ft/hr. 15,262.0 15,712.0 5/25/2021 18:00 5/26/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 15,712' - 16,115' MD, 8,481' TVD, 10 k wob, 275 gpm, 2260 psi, 16% flow out, 120 rpm, 10 k tq, 9.94 ppg ECD, 226 k Up Wt, 151k So Wt, 190 k Rot Wt. ADT = 4.1, total bit hrs = 61.4 Control drilling at 100 ft/hr. At 16,071' MD observed 150 bbl/hr losses, decreased pump rate to 250 gpm and continue drilling ahead. Current loss rate 65 bbls/hr. 15,712.0 16,115.0 Rig: DOYON 25 Page 31/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/26/2021 00:00 5/26/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 16,115' - 16,553' MD, 8,482' TVD, 16 k wob, 250 gpm, 2040 psi, 12% flow out, 100 rpm, 10 k tq, 9.88 ppg ECD, 227 k Up Wt, 174k So Wt, 185 k Rot Wt. ADT = 4.9, total bit hrs = 66.5 Holding 150 PSI back pressure with MPD Control drilling at 100 ft/hr. 16,115.0 16,553.0 5/26/2021 06:00 5/26/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 16,553' - 17,040' MD, 8,482' TVD, 13 k wob, 275 gpm, 2380 psi, 15% flow out, 100 rpm, 10 k tq, 10.03 ppg ECD, 235 k Up Wt, 147k So Wt, 188 k Rot Wt. ADT = 5.1, total bit hrs = 71.6 Holding 150 PSI back pressure with MPD Control drilling at 100 ft/hr. 16,553.0 17,040.0 5/26/2021 12:00 5/26/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6.5" production hole from 17,040' - 17,515' MD, 8,484' TVD, 10 k wob, 275 gpm, 2510 psi, 14% flow out, 120 rpm, 10 k tq, 10.04 ppg ECD, 237 k Up Wt, 140k So Wt, 182 k Rot Wt. ADT = 4.7, total bit hrs = 76.3 Holding 150 PSI back pressure with MPD Control drilling at 100 ft/hr. 17,040.0 17,515.0 5/26/2021 18:00 5/26/2021 22:30 4.50 PROD1, DRILL DDRL P Drill 6.5" production hole from 17,515' - 17,880' MD, 8,486' TVD, 10 k wob, 275 gpm, 2560 psi, 13% flow out, 100 rpm, 10 k tq, 10.04 ppg ECD, 237 k Up Wt, 140k So Wt, 182 k Rot Wt. ADT = 4.7, total bit hrs = 76.3 Holding 150 PSI back pressure with MPD Control drilling at 100 ft/hr. 17,515.0 17,880.0 5/26/2021 22:30 5/27/2021 00:00 1.50 PROD1, DRILL CIRC T Observed 275 psi spike in standpipe pressure followed by a loss of communication with downhole tools. Checked surface equipment, swapped mud pumps. Cycled pumps and sent downlinks. Increased pump rate to 292 gpm, 2990 psi. Shut off pumps for 10 min. while holding 230 psi back pressure with MPD to reset tool breaker. Simops- begin building hi vis and low vis sweeps. 17,880.0 17,880.0 5/27/2021 00:00 5/27/2021 04:15 4.25 PROD1, DRILL CIRC T Continue trouble shooting pressure spike and attempting to regain comms with downhole tools. Fluctuate from 60- 180 rpm, observed pressure rise from 2875 - 3720 psi, Pump low vis / high vis tandem sweeps from surface to surface plus one bottoms up. While racking back stands from 17,880' - 17,704' MD. 266 gpm, 2800 - 3200 psi, 10 % flow out, 60 rpm, 8.5 k tq. 235 k Up Wt, 140 k So Wt, 181 k Rot Wt. 17,880.0 17,704.0 5/27/2021 04:15 5/27/2021 06:45 2.50 PROD1, DRILL MPDA T Finger printing well with MPD to determine kill weight. 5 rpm, 8 k tq. Initial - 230 psi, Final - 55 psi. 17,704.0 17,704.0 Rig: DOYON 25 Page 32/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/27/2021 06:45 5/27/2021 08:45 2.00 PROD1, DRILL CIRC T Circulated bottoms up while pulling out of the hole from 17,704' - 17,423' MD, 270 gpm, 2700 psi, 16% flow out, 80 rpm, 11 k tq, 181 k Rot Wt. 17,704.0 17,423.0 5/27/2021 08:45 5/27/2021 11:15 2.50 PROD1, DRILL SMPD T Stripped out of the hole from 17,423' - 15,301' MD, 245 k Up Wt. Held 180 psi static - 260 psi dynamic with MPD. 17,423.0 15,301.0 5/27/2021 11:15 5/27/2021 12:30 1.25 PROD1, DRILL BKRM T Observed overpull at 15,301' MD, attempt to work through. Run in hole to 15,336' MD. Backreamed out of the hole from 15,336' - 14,956' MD, 220 gpm, 1610 psi, 13% flow out, 80 rpm, 8 k tq, 245 k Up Wt, 135 k So Wt, 185 k Rot Wt. 15,301.0 14,956.0 5/27/2021 12:30 5/27/2021 15:00 2.50 PROD1, DRILL SMPD T Stripped out of the hole from 14,956' - 12,109' MD, 232 k Up Wt. Held 180 psi static - 260 psi dynamic with MPD. 14,956.0 12,109.0 5/27/2021 15:00 5/27/2021 17:15 2.25 PROD1, DRILL CIRC T Displace well to 9.4 ppg vis brine while reciprocating from 10,109' - 12,013' MD, 275 gpm, 2270 psi, 16 % flow out, 80 rpm, 6 k tq, 235 k Up Wt, 132 k So Wt, 185 k Rot Wt. Take SPR's 12,109.0 12,013.0 5/27/2021 17:15 5/27/2021 17:45 0.50 PROD1, DRILL SMPD T Stripped out of the hole from 12,013' - 11,720' MD, 232 k Up Wt. Held 180 psi static - 260 psi dynamic with MPD. 12,013.0 11,720.0 5/27/2021 17:45 5/27/2021 18:30 0.75 PROD1, DRILL OWFF T Observe well for flow for 30 minutes - static Pump 40 bbls 9.9 ppg dry job. 11,720.0 11,720.0 5/27/2021 18:30 5/28/2021 00:00 5.50 PROD1, DRILL SMPD T Stripped out of the hole from 11,720' - 946' MD, 71 k Up Wt. Held 40 psi static - 80 psi dynamic with MPD. 11,720.0 946.0 5/28/2021 00:00 5/28/2021 00:45 0.75 PROD1, DRILL SMPD T Stripped out of the hole from 946' - 338' MD, 71 k Up Wt. Held 40 psi static - 80 psi dynamic with MPD. 946.0 338.0 5/28/2021 00:45 5/28/2021 01:00 0.25 PROD1, DRILL OWFF T Observe well for flow for 10 minutes - static 338.0 338.0 5/28/2021 01:00 5/28/2021 01:30 0.50 PROD1, DRILL MPDA T Remove the RCD bearing and install the trip nipple per MPD Rep. 338.0 338.0 5/28/2021 01:30 5/28/2021 07:30 6.00 PROD1, DRILL BHAH T LD BHA per Baker DD and MWD, plug in and dump tools, Diagnos tool issues, Maintain constance hole fill w/ trip tanks 338.0 0.0 5/28/2021 07:30 5/28/2021 09:15 1.75 PROD1, DRILL BHAH T PJSM, M/U RSS BHA in the mouse hole and L/D BHA t/ casing shed f/ BOP test 0.0 0.0 5/28/2021 09:15 5/28/2021 09:45 0.50 PROD1, DRILL OTHR T Clean rig floor of BHA handling tools, Line up choke manifold & chart recorder f/ BOP test 0.0 0.0 5/28/2021 09:45 5/28/2021 11:30 1.75 PROD1, DRILL BOPE P P/U 4'' test joint & pull wear bushing, Install test plug, M/U TIW's, flush & fill stack w/ clean water 0.0 0.0 Rig: DOYON 25 Page 33/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/28/2021 11:30 5/28/2021 16:00 4.50 PROD1, DRILL BOPE P Test BOPE all tests 250 psi low for 5 min, 3,500 psi high for 10 minutes each with 4" - test annular and 2 7/8" x 5 1/2" UPR and LPR, test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=2950 psi, manifold=1550psi initial. After all functions, accumulator=1600 psi, 15 secs to 200 psi with two electric pumps, 97 secs to build to full system pressure with two electric and two air pumps. Closing times, annular=23secs, UPR=18secs, blind/shears=16secs, LPR=16 secs, choke HCR=2 secs, kill HCR=2secs. 6 Nitrogen bottles back-up avg=1908psi, CPAI witnessed. Tested PVT, gain/loss, flow out, LEL and H2S alarms. Test witnessed by AOGCC Brian Bixby, BLM Rep Quinn Sawyer waived witness of test via email @ 7:03 on 5/27/21 0.0 0.0 5/28/2021 16:00 5/28/2021 16:45 0.75 PROD1, DRILL BOPE P PJSM, R/D testing equip, L/D test joint, Blow down lines 0.0 0.0 5/28/2021 16:45 5/28/2021 17:00 0.25 PROD1, DRILL OTHR P Install wear bsuhing, FMC witnessed install 0.0 0.0 5/28/2021 17:00 5/28/2021 19:00 2.00 PROD1, DRILL BHAH P PJSM, M/U RSS BHA as per Baker DD, 0.0 152.0 5/28/2021 19:00 5/29/2021 00:00 5.00 PROD1, DRILL TRIP T TIH f/ 152' t/ 9,362', filling pipe every 20 stds and monitoring fill ups on trip tanks 152.0 9,362.0 5/29/2021 00:00 5/29/2021 01:15 1.25 PROD1, DRILL TRIP T TIH f/ 9,362' t/ 11,500' Filling pipe every 20 stands, monitoring fill ups on trip tank 9,362.0 11,500.0 5/29/2021 01:15 5/29/2021 02:30 1.25 PROD1, DRILL SLPC T PJSM, Slip & cut 47' of drill line, reccalibrate amphion, Pason, & MWD 11,500.0 11,500.0 5/29/2021 02:30 5/29/2021 03:45 1.25 PROD1, DRILL OTHR T PJSM, Pull trip nipple & install rotating head, Fill pipe & establish returns through MPD equip. 11,500.0 11,500.0 5/29/2021 03:45 5/29/2021 06:45 3.00 PROD1, DRILL TRIP T TIH f/ 11,500' t/ 15,526' Filling pipe every 20 stands, monitoring fill ups on trip tank Had to ream BHA through shoe RPM-20, no torque or WOB seen once rotary was established 11,500.0 15,526.0 5/29/2021 06:45 5/29/2021 09:15 2.50 PROD1, DRILL CIRC T Fill pipe & establish circ @ 15,526' Rot. & Recip. @ 275 GPM w/ 1,850 psi w/ displacing well bore over t/ 9.0 ppg FloPro , 9.0 ppg in/out @ 7,000 stks. 15,526.0 15,526.0 5/29/2021 09:15 5/29/2021 10:30 1.25 PROD1, DRILL TRIP T Cont. TIH f/ 15,526' t/ 17,708' Filling pipe every 20 stands, monitoring fill ups on trip tank 15,526.0 17,708.0 5/29/2021 10:30 5/29/2021 11:45 1.25 PROD1, DRILL WASH T Wash & Ream in hole f/ 17,708' t/ 17,880' GPM-275 RPM-40 PSI- 2,250 Torq- 8K 17,708.0 17,880.0 Rig: DOYON 25 Page 34/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/29/2021 11:45 5/29/2021 12:00 0.25 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 17,880' t/ 17,895' WOB- 6-8K RPM-100 Torq.-9-11K GPM-275 On Btm PSI- 2290 Flow out- 15% ECD- 9.97 PPG P/U- 233K S/O- 152K Rot- 186K ADT- .2 Total Bit Hrs- .2 MPD Back psi- 175 Control drill @ 100 fph f/ 17,880' t/ 17,895' 17,880.0 17,895.0 5/29/2021 12:00 5/29/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 17,895' t/ 18,331' WOB- 12-15K RPM-110 Torq.-14-16K GPM-275 On Btm PSI- 2403 Flow out- 17% ECD- 10.07 PPG P/U- 246K S/O- 171K Rot- 190K ADT- 4.7 Total Bit Hrs- 4.9 MPD Back psi- 225 Control drill @ 100 fph f/ 17,895' t/ 18,331' 17,895.0 18,331.0 5/29/2021 18:00 5/30/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 18,331' t/ 18,790' WOB- 19-22K RPM-110 Torq.-14-16K GPM-275 On Btm PSI- 2450 Flow out- 17% ECD- 10.13 PPG P/U- 246K S/O- 171K Rot- 190K ADT- 5.0 Total Bit Hrs- 9.9 MPD Back psi- 225 Control drill @ 100 fph f/ 17,895' t/ 18,331' 18,331.0 18,790.0 Rig: DOYON 25 Page 35/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/30/2021 00:00 5/30/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 18,790' t/ 19,301' WOB- 19-22K RPM-110 Torq.-16-18K GPM-275 On Btm PSI- 2525 Flow out- 17% ECD- 10.12 PPG P/U- 242K S/O- 134K Rot- 182K ADT- 5.0 Total Bit Hrs- 14.9 MPD Back psi- 225 Control drill @ 100 fph f/ 18,790' t/ 19,301' 18,790.0 19,301.0 5/30/2021 06:00 5/30/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 19,301' t/ 19,796' WOB- 19-22K RPM-110 Torq.-16-18K GPM-275 On Btm PSI- 2625 Flow out- 17% ECD- 10.05 PPG P/U- 248K S/O- 121K Rot- 178K ADT- 4.9 Total Bit Hrs- 19.8 MPD Back psi- 225 Control drill @ 100 fph f/ 19,301' t/ 19,796' 19,301.0 19,796.0 5/30/2021 12:00 5/30/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 19,796' t/ 20,292' WOB- 19-22K RPM-100 Torq.-16-18K GPM-275 On Btm PSI- 2875 Flow out- 17% ECD- 10.27 PPG P/U- 251K S/O- 112K Rot- 178K ADT- 5.2 Total Bit Hrs- 25.0 MPD Back psi- 225 Control drill @ 100 fph f/ 19,796' t/ 20,292' 19,796.0 20,292.0 Rig: DOYON 25 Page 36/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/30/2021 18:00 5/31/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 20,292' t/ 20,775' WOB- 19-22K RPM-100 Torq.-16-18K GPM-275 On Btm PSI- 2875 Flow out- 17% ECD- 10.27 PPG P/U- 258K S/O- 112K Rot- 178K ADT- 4.9 Total Bit Hrs- 29.9 MPD Back psi- 225 Control drill @ 100 fph f/ 20,292' t/ 20,775' 20,292.0 20,775.0 5/31/2021 00:00 5/31/2021 06:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 20,775' t/ 21,294' WOB- 15-20K RPM-100 Torq.-16-18K GPM-275 On Btm PSI- 2750 Flow out- 17% ECD- 10.35 PPG P/U- 242K S/O- 110K Rot- 180K ADT- 5.3 Total Bit Hrs- 35.2 MPD Back psi- 225 Control drill @ 100 fph f/ 20,775' t/ 21,294' 20,775.0 21,300.0 5/31/2021 06:00 5/31/2021 12:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 21,294' t/ 21,795' WOB- 15-20K RPM-100 Torq.-16-18K GPM-275 On Btm PSI- 2750 Flow out- 17% ECD- 10.35 PPG P/U- 248K S/O- 112K Rot- 180K ADT- 4.9 Total Bit Hrs- 40.1 MPD Back psi- 240 Control drill @ 100 fph f/ 21,294' t/ 21,795' 21,300.0 21,795.0 Rig: DOYON 25 Page 37/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/31/2021 12:00 5/31/2021 18:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 21,795' t/ 22,270' WOB- 15-20K RPM-100 Torq.-16-18K GPM-275 On Btm PSI- 3150 Flow out- 17% ECD- 10.46 PPG P/U- 274K S/O- 107K Rot- 185K ADT- 5.1 Total Bit Hrs- 45.2 MPD Back psi- 240 Control drill @ 100 fph f/ 21,795' t/ 21,270' 21,795.0 22,270.0 5/31/2021 18:00 6/1/2021 00:00 6.00 PROD1, DRILL DDRL P Drill 6 1/2'' Lateral f/ 22,270' t/ 22,734' WOB- 15-20K RPM-100 Torq.-17-19K GPM-275 On Btm PSI- 3000 Flow out- 17% ECD- 10.58 PPG P/U- 278K S/O- 107K Rot- 194K ADT- 5.1 Total Bit Hrs- 47.3 MPD Back psi- 240 Control drill @ 100 fph f/ 22,270' t/ 22,734' 22,270.0 22,734.0 6/1/2021 00:00 6/1/2021 01:15 1.25 PROD1, DRILL CIRC T Rot & Reciprocate pipe f/ 22,734' t/ 22,659' w/ waiting on orders t/ drill ahead without steering ability Decision made t/ drill ahead until out of zone GPM-275 RPM-60 Flowout-14% Torq-14K Dump & dilute 550 bbls 9.0 ppg FloPro 14,000 Stks. 22,734.0 22,734.0 Rig: DOYON 25 Page 38/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/1/2021 01:15 6/1/2021 06:00 4.75 PROD1, DRILL DDRL T Drill 6 1/2'' Lateral f/ 22,734' t/ 23,197' RSS lost steering ribs @ 22,734' and is uable to correct build or walk, Decision was made t/ drill ahead until logging tools shows we have reached the upper limit of reservoir. WOB- 15-20K RPM-100 Torq.-15-19K GPM-275 On Btm PSI- 3050 Flow out- 17% ECD- 10.58 PPG P/U- 278K S/O- 107K Rot- 194K Depths for ROP logging test 22,845'- 22,880' - 125' fph 22,880' - 22,910' - 150' fph 22,910'- 22,942' - 175' fph 22,942' - 22,973' - 200' fph ADT- 4.3 Total Bit Hrs- 54.3 MPD Back psi- 240 Control drill @ 100 fph f/ 22,734' t/ 23,197' 22,734.0 23,197.0 6/1/2021 06:00 6/1/2021 11:00 5.00 PROD1, DRILL DDRL T Drill 6 1/2'' Lateral f/ 23,197' t/ 23,605' RSS lost steering ribs @ 22,734' and is uable to correct build or walk, Decision was made t/ drill ahead until logging tools shows we have reached the upper limit of reservoir. WOB- 15-20K RPM-100 Torq.-15-19K GPM-275 On Btm PSI- 3090 Flow out- 17% ECD- 10.37 PPG P/U- 268K S/O- N/A Rot- 180K ADT- 4.5 Total Bit Hrs- 58.8 MPD Back psi- 240 Control drill @ 100 fph f/ 23,197' t/ 23,605' 23,197.0 23,605.0 Rig: DOYON 25 Page 39/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/1/2021 11:00 6/1/2021 11:30 0.50 PROD1, DRILL BKRM P BROOH f/ 23,605' t/ 23,510' Laying down pipe out of the mouse hole GPM-275 PSI-2820 Flow out-16% RPM-80 Torq-14K ECD-10.44 23,605.0 23,510.0 6/1/2021 11:30 6/1/2021 15:00 3.50 PROD1, DRILL CIRC P Circ 2 btms up w/ working pipe f/ 23,510' t/ 23,319' L/D a stand after first btms up GPM-275 PSI-3130 Flow out-16% RPM-80 Torq-15K 23,510.0 23,319.0 6/1/2021 15:00 6/1/2021 17:00 2.00 PROD1, DRILL OWFF P Finger print well flow @ 23,319' Initial PSI build up - 140 Final PSI build up- 69 MWE- 9.25 PPG 23,319.0 23,319.0 6/1/2021 17:00 6/1/2021 20:00 3.00 PROD1, DRILL CIRC P Dispalce wellbore t/ 9.4 ppg Viscosified Saltwater w/ reciprocating pipe f/ 23,319' t/ 23,222' GPM-275 PSI-2640 RPM-80 Torq-13K 23,319.0 23,222.0 6/1/2021 20:00 6/2/2021 00:00 4.00 COMPZ1, RPCOMP SMPD P SOOH f/ 23,222' t/ 18,855' MPD Ou tslips- 130 psi MPD In slips- 50 23,222.0 18,855.0 6/2/2021 00:00 6/2/2021 05:00 5.00 COMPZ1, RPCOMP SMPD P SOOH f/ 18,555' t/ 11,721' MPD Ou tslips- 130 psi MPD In slips- 50 18,855.0 11,721.0 6/2/2021 05:00 6/2/2021 06:45 1.75 COMPZ1, RPCOMP CIRC P Displace hole w/ 9.4 ppg Corrosion Inhibited Brine @ 11,721' GPM-275 PSI-1860 Total Stks-5675 11,721.0 11,721.0 6/2/2021 06:45 6/2/2021 07:15 0.50 COMPZ1, RPCOMP OWFF P Flow Chk. well, Well static 11,721.0 11,721.0 6/2/2021 07:15 6/2/2021 08:00 0.75 COMPZ1, RPCOMP OTHR P PJSM, Pull rotating head and install trip nipple, Hook up hole fill lines and check same 11,721.0 11,721.0 6/2/2021 08:00 6/2/2021 08:30 0.50 COMPZ1, RPCOMP CIRC P Get slow pump rates, Pump slug & blow down TDS 11,721.0 11,721.0 6/2/2021 08:30 6/2/2021 12:00 3.50 COMPZ1, RPCOMP PULD P PJSM, L/D 4'' drill pipe f/ 11,721' t/ 8,189' Monitoring fill ups on trip tank 11,721.0 8,189.0 6/2/2021 12:00 6/2/2021 20:00 8.00 COMPZ1, RPCOMP PULD P PJSM, L/D 4'' drill pipe f/ 8,189' t/ BHA' Monitoring fill ups on trip tank 8,189.0 380.0 6/2/2021 20:00 6/2/2021 20:30 0.50 COMPZ1, RPCOMP OWFF P Flow chk. well before pulling BHA into stack, Well static 380.0 380.0 6/2/2021 20:30 6/2/2021 23:00 2.50 COMPZ1, RPCOMP BHAH P PJSM, L/D sources, Break bit, L/D MWD, LWD, & RSS 380.0 0.0 6/2/2021 23:00 6/3/2021 00:00 1.00 COMPZ1, RPCOMP OTHR P Wash stack, Pull wear bushing, Wash stack 0.0 0.0 Rig: DOYON 25 Page 40/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/3/2021 00:00 6/3/2021 00:30 0.50 COMPZ1, RPCOMP OTHR P PJSM, Pick up test joint and make up wear bushing puller t/ joint, Pull wear bushing 0.0 0.0 6/3/2021 00:30 6/3/2021 01:15 0.75 COMPZ1, RPCOMP OTHR P Wash out stack @ 8 bpm & 10 rpm, Break off wash out tool and rack back stand in derrick 0.0 0.0 6/3/2021 01:15 6/3/2021 03:15 2.00 COMPZ1, RPCOMP RURD P Attempt t/ pick up Halliburton control line skid t/ floor, Spool was to big to fit through beaver hole, Take spool off skid and pick up spool & skid separate to floor. Reassemble spool to skid and spot on rig floor, R/U casing tongs and test same, Hang control line shieve off in derrick, HES performed test on control line 0.0 0.0 6/3/2021 03:15 6/3/2021 05:00 1.75 COMPZ1, RPCOMP RCST P PJSM, P/U 4.5'' 12.6 ppf HYD563 as per COP tally detail f/ surface t/ 804' Install floating centralizers on TXP joints Monitor returns on trip tanks 0.0 804.0 6/3/2021 05:00 6/3/2021 06:00 1.00 COMPZ1, RPCOMP RCST P P/U HES Opsis mandreal & downhole valve, make up control line t/ valve & test same, Test OK 804.0 804.0 6/3/2021 06:00 6/3/2021 12:00 6.00 COMPZ1, RPCOMP RCST P Cont RIH w/ 4.5'' 12.6 ppf HYD563 as per completion detail f/ 803' t/ 5,030' monitoring returns on the trip tank RIH @ 90' fpm TEC wire conductivity test @ 1,400' - 2,808' - 4,750' 804.0 5,030.0 6/3/2021 12:00 6/3/2021 18:00 6.00 COMPZ1, RPCOMP RCST P Cont RIH w/ 4.5'' 12.6 ppf HYD563 as per completion detail f/ 5,030' t/ 9,998' monitoring returns on the trip tank RIH @ 90' fpm TEC wire conductivity test @ 6,800' - 8,800' 5,030.0 9,998.0 6/3/2021 18:00 6/3/2021 21:00 3.00 COMPZ1, RPCOMP RCST P Cont RIH w/ 4.5'' 12.6 ppf HYD563 as per completion detail f/ 9,998' t/ 12,330' monitoring returns on the trip tank RIH @ 90' fpm TEC wire conductivity test @ 10,800' 9,998.0 12,330.0 6/3/2021 21:00 6/3/2021 23:00 2.00 COMPZ1, WHDBOP HOSO P PJSM, M/U hanger as per FMC Tech Run TEC wire through hanger & test connection, Test OK R/D HES sheaves & spool 12,330.0 12,330.0 6/3/2021 23:00 6/4/2021 00:00 1.00 COMPZ1, WHDBOP HOSO P Land tubing hanger @ 12,365' as per FMC Tech, Run lock down pens & verify torq Fill BOP stack & lines w/ water f/ packer test 12,330.0 12,365.0 6/4/2021 00:00 6/4/2021 00:45 0.75 COMPZ1, WHDBOP THGR P Test hanger seals t/ 3,000 psi f/ 30 min. w/ monitoring IA f/ flow during test, R/D testing equip SIMOPS: Remove tubing joints f/ casing shed 12,365.0 12,365.0 6/4/2021 00:45 6/4/2021 01:15 0.50 COMPZ1, WHDBOP OWFF P Observe barriers are holding f/ 30 min. 12,365.0 12,365.0 6/4/2021 01:15 6/4/2021 02:00 0.75 COMPZ1, WHDBOP OTHR P Pull 90' mousehole, shrew hole, Nipple down MPD lines, Flush & blow down hole fill line & choke & kill lines, Pump out BOP stack 12,365.0 12,365.0 Rig: DOYON 25 Page 41/41 MT7-04 Report Printed: 6/17/2021 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 6/4/2021 02:00 6/4/2021 03:30 1.50 COMPZ1, WHDBOP NUND P PJSM, Pull trip nipple, Nipple down BOP's & rack back same, Install 90' mousehole, Pull riser & rack in BOP deck SIMOPS: Change pump liners t/ 6.5'' and clean mud pits 12,365.0 12,365.0 6/4/2021 03:30 6/4/2021 05:30 2.00 COMPZ1, WHDBOP THGR P Nipple up FMC adapter flange & terminate TEC wire through same, Test termination & TEC wire 12,365.0 12,365.0 6/4/2021 05:30 6/4/2021 10:00 4.50 COMPZ1, WHDBOP THGR P PJSM, N/U FMC tubing tree, Test tree t/ 5,000 psi f/ 5 minutes, COP witnessed test, Fill tree w/ diesel & test 250 low psi, 5,000 high psi f/ 10 min. each test SIMOPS- Lay down 4'' drill pipe out of derrick 12,365.0 12,365.0 6/4/2021 10:00 6/4/2021 13:00 3.00 COMPZ1, WHDBOP PACK P Rig up Lil Red pump truck, Drop 3.688'' setting ball, Test LRS lione t/ 5,000 psi, Test good 12,365.0 12,365.0 6/4/2021 13:00 6/4/2021 18:30 5.50 COMPZ1, WHDBOP PACK P Bull head 249 bbls corrosion inhibited saltwater down tubing- 71 bbls over calculated- (Ball did not seat- PSI increased t/ 750 psi @ 128bbls and immediately fell back t/ ICP of 400 psi) Line up & pump 24 bbls diesel down tubing 12,365.0 12,365.0 6/4/2021 18:30 6/4/2021 20:00 1.50 COMPZ1, WHDBOP THGR P PJSM, R/U FMC lubricator t/ install Type H BPV, R/D lubricator, M/U blank flanges t/ tubing valves Well Secure Final Tubing PSI- 200, IA-200, OA-40 SIMOPS- Lay down 4'' drill pipe out derrick 12,365.0 12,365.0 6/4/2021 20:00 6/5/2021 00:00 4.00 DEMOB, MOVE DMOB P Cont t/ lay down 4'' drill pipe out of derrick, Blow down steam lines, mud lines, & water lines Rig released t/ MT7-03 12,365.0 12,365.0 Rig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uhl, Meredith D (CED) From:Guhl, Meredith D (CED) Sent:Monday, July 12, 2021 10:49 AM To:'Taylor, Jenna'; Gorham, Brad Subject:RE: [EXTERNAL]Mudlogs GMTU MT7-04? PTD 221-017 Jenna, No,Iwilladdmudlogstobox22andappendyouremailtotheformsoit’sclear. Thanks! Meredith From:Taylor,Jenna<Jenna.L.Taylor@conocophillips.com> Sent:Monday,July12,20219:06AM To:Guhl,MeredithD(CED)<meredith.guhl@alaska.gov>;Gorham,Brad<Brad.Gorham@conocophillips.com> Subject:RE:[EXTERNAL]MudlogsGMTUMT7Ͳ04?PTD221Ͳ017 Meredith–Apologies,thatwasmyoversight.Yes,mudlogswereranonMT7Ͳ04.DoweneedtoreͲsubmitthe10Ͳ407 withthecorrect? Jenna From:Guhl,MeredithD(CED)<meredith.guhl@alaska.gov> Sent:Monday,July12,20218:53AM To:Gorham,Brad<Brad.Gorham@conocophillips.com>;Taylor,Jenna<Jenna.L.Taylor@conocophillips.com> Subject:[EXTERNAL]MudlogsGMTUMT7Ͳ04?PTD221Ͳ017 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. HelloBradandJenna, WeremudlogsrunonGMTUMT7Ͳ04,PTD221Ͳ017?Theyarenotlistedonform10Ͳ407inBox22LogsObtained,butI didreceiveasetofcuttingsattheAOGCCforthiswell. Thankyou, Meredith MeredithGuhl(she/her) PetroleumGeologyAssistant AlaskaOilandGasConservationCommission 333W.7thAve,Anchorage,AK99501 meredith.guhl@alaska.gov Direct:(907)793Ͳ1235 2 CONFIDENTIALITYNOTICE:ThiseͲmailmessage,includinganyattachments,containsinformationfromtheAlaskaOilandGasConservation Commission(AOGCC),StateofAlaskaandisforthesoleuseoftheintendedrecipient(s).Itmaycontainconfidentialand/orprivilegedinformation. Theunauthorizedreview,useordisclosureofsuchinformationmayviolatestateorfederallaw.IfyouareanunintendedrecipientofthiseͲmail, pleasedeleteit,withoutfirstsavingorforwardingit,and,sothattheAOGCCisawareofthemistakeinsendingittoyou,contactMeredithGuhlat 907Ͳ793Ͳ1235ormeredith.guhl@alaska.gov. RECEIVED JUN 2 2 2021 SAMPLE TRANSMITTAL �PGCC CC 333 WEST 7T" SUITE 100 ANCH. AK. 99501 2791433 OPERATOR: CPAI SAMPLE TYPE: Dry Cuttings SAMPLES SENT: MT7-04 200-23605 8 Boxes SENT BY: M. McCRACKEN DATE: June 22, 2021 AIR BILL: N/A CPAI: 201062201 CHARGE CODE: N/A NAME: MT7-04 NUMBER OF BOXES: 8 Box UPON RECEIPT OF THESE SAMPLES, PLEASE NOTE ANY DISCREPANCIES AND RETURN A SIGNED COPY OF THIS FORM TO: CONOCOPHILLIPS, ALASKA 700 G ST ATO-380 ANCHORAGE, AK. 99510 ATTN: MIKE McCRACKEN Mike.mccracken@conocophillips.com RECEIVED: G�3 DI v-J � (2i6 1 V STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: GMTU MT7-04 Contractor/Rig No.: Doyon 25 ' Operator: ConocoPhillips Alaska, Inc. Type Operation: DRILL Sundry No: Type Test: BIWKLY - MISC. INSPECTIONS: P/F Location Gen.: _ P_ _ _- Housekeeping: _ P PTD On Location P Standing Order Posted P Well Sign _ P " Drl. Rig P Hazard Sec. P _ Misc NA PTD#: 2210170 DATE: 5/28/2021 - Operator Rep: R. Reinhardt / B. Book Test Pressures: Rams: Annular: Valves: MASP 250/3500 , 250/3500 - 250/3500 , 1891 TEST DATA MUD SYSTEM: Visual Alarm Trip Tank P_____ P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector _ P P _ H2S Gas Detector P P " MS Misc 0 NA Reviewed By. X2 P.1. Supry 5 Ze?1 Comm Inspector Brian Bixby Insp Source Rig Rep: R.Fritts / O. Williams Inspector Inspection No: bopBDB210529090925 - Related Insp No: ACCUMULATOR SYSTEM: Time/Pressure P/F System Pressure 2950 P . Pressure After Closure 1600 P " 200 PSI Attained 22 P " Full Pressure Attained _ 138 _ P Blind Switch Covers: YES P Nitgn. Bottles (avg): _1850 P " ACC Misc 0 NA FLOOR SAFTY VALVES: BOP STACK: Quantity P/F Quantity Size P/F Upper Kelly 1 P- Stripper 0 NA Lower Kelly 1 P - Annular Preventer _—_1 _- 13 5/8 P " Ball Type 2 - ' P_- #1 Rams - 1 2 7/8x5 1/2 P Inside BOP 1 P #2 Rams 1 Blind/Shear P FSV Misc 0 NA #3 Rams 1 ' 2 7/8x5 1/2 " P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 - 3 1/8 - _ P HCR Valves 2 ' 3 1/8 P Kill Line Valves 2 - 3 1/8 P ' Check Valve 0 NA BOP Misc 0 NA CHOKE MANIFOLD: Quantity P/F No. Valves 15 P Manual Chokes 1 ___ P Hydraulic Chokes 1 P CH Misc 0 NA INSIDE REEL VALVES: (Valid for Coil Rigs Only) Quantity P/F Inside Reel Valves 0 NA Number of Failures: 0 -, Test Results Test Time 4.5 Remarks: Tesed with 4" and 4.5" test joints, tested all gas alarms and PVT's. Good Test I e's�— C C4�t.c"J ��Ttk C-.,kt —( 7 - o 4 ( P-il) ) 2-1 Of -7 0 ) A-cccc RIG.25 130P TEST 250/3500 W/4" & 4.5" Make up 4" Test Joint / Fill F/The pump through the kill line #1 — CLOSE: ANNULAR PREVENTER, UPPER IBOP CMV'S # 13, 14, 15, t. 8, 4"KILL L � PME- �� i A i- 1 'tre13 T I, i , . #2- CLCISUPPER PIPE RAMS, LOWER IBOP, HCR KILL, CMV"S 110, 12, and 2 OPEN ANNULAR, UPPER IBOP & 4" KILL LINE VALVE ON RIG FLOOR CMV'S #15, 1 J*REMOVE ROCKET LAUNCHER FROM TOP DRIVE AT THIS TIME AND BLOW #3 — CLOSE: CMV'S # 9, 6, 11, 4" DART VALVE, MANUAL KILL; OPEN HCR KILL, CMV`S # 10, 12 #4— CLOSE: CMVS#7,8,5,4" TIW; OPEN DART VALVE, CMV'S# 6,9, 11, #5 — CLOSE: CMV. # 3, 4" TIW; OPEN CMV # 8, 4"T1W #6 —CLOSE: LOWER PIPE RAMS; OPEN UPPER RAMS *OPEN LOWER PIPE RAMS, PERFORM KOOMEY TEST AT THIS TIME / REMOVE 4" WVYffelviln 1 11 11 , pj IIII "I Im #8 & 8A LINE UP TO BOTH HYD & MANUAL CHOKES, PRESSURE UP TO 2K & HOLD FOR 2-3 MINS BLEED EITHER ONE DOWN TO 1500P51 & HOLD FOR 2-3 MINS, BLEED TO ZERO INSTALL 4,5"' TEST JOINT #9- CLOSE ANNULAR, HCR CHOKE; OPEN CMV #2 #11- CLOSE LOWER PIPE RAMS; OPEN UPPER PIPE RAMI From:WSC Operations Engineer To:Loepp, Victoria T (OGC); Hobbs, Greg S Cc:Njoku, Johnson; Brillon, Chris L; Gorham, Brad; WSC Rig Advisor Subject:MT7-04 (PTD #221-017) Casing Test and FIT Date:Saturday, May 22, 2021 4:04:52 PM Attachments:image001.png MT7-04 7.625 Int Casing-FIT 5-22-21.xlsx Hi Victoria, Please see the attached, MT7-04 intermediate casing test to 3,500 psi and FIT to 11.0 ppg EMW. Thanks, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) Well Name: Rig: Date:Drilling Supervisor:Pump used:2Strokesarrels434Casing Test Pressure Integrity TestHole Size:10RKB-CHF:38.9Ft11741.2Ft-MD8356.4Ft-TVD11771.0Ft-MD8360.0Ft-TVD Strks psi Min psi Strks psi Min psi6.875 70003650 0 00.004602 15013600 1 500.25420Mud Weight: 10.0ppg Mud Weight:10.0ppg4 30023600 2 1000.50400Mud 10 min Gel: 7.0Lb/100 Ft2 Mud 10 min Gel:7.0Lb/100 Ft26 43033600 3 1501.00370Test Pressure: 3500.0psi Rotating Weight:#######Lbs8 57543600 4 1901.50360Rotating Weight: ######LbsBlocks/Top Drive Weight:43000.0Lbs10 70053600 5 2402.00355Blocks/Top Drive Weight:43000.0Lbs Desired PIT EMW:11.0ppg12 81063600 6 2902.50350Estimates for Test: 6.3 bbls Estimates for Test: 456 psi 0.8 bbls14 95073600 7 3403.003451116 102583600 8 3803.50340EMW = Leak-off Pressure + Mud Weight =18 112593600 9 4254.00340 0.052 x TVD 0.052 x 835620 1250103600 10 4754.5034011.0ppg22 13505.0033524 14755.5033526 16006.0033528 17256.5033030 18757.0033032 20007.5033034 21508.0033036 22758.5032538 24009.0032540 25509.5032542 270010.0032544 287546 300048 315050 330052 350054 365056585.8 Bbls5.5Bbls 1.0 Bbls0.8BblsComments:Volume Bled BackShut-in Pumping Shut-inVolume PumpedPRESSURE INTEGRITY TESTType of Test:Casing TestPressure IntegrityTestHole DepthCasing Shoe DepthCasing Size and Description:Pump Rate: 5/21/2021R. Reinhardt / M. TuckerVolume/Stroke0.70Pumping0.1007MT7-04 Doyon 25Performed casing test with PIP inflatable packer in hole @ 11,648' MD. Casing test is testing the 7.625" x 4" annulus..FIT performed 5-22-21CONOCOPHILLIPS Alaska, Inc.Pumping downEMW at 11741.2 Ft-MD (8356.4 Ft-TVD) =4209.95475+PIT 15 SecondShut-in Pressure, psiVolume PumpedVolume Bled BackVolume Input0500100015002000250030003500400001234567PRESSURECASING TESTLEAK-OFF TESTPIT PointBarrels0 5 10 15 20 25 30Shut-In time, MinutesLost 50 psi during test, held 98.6% of test pressure.MT7-04 7.625 Int Casing-FIT 5-22-21.xlsxSummary From:Loepp, Victoria T (OGC) To:Rixse, Melvin G (OGC) Subject:Fwd: [EXTERNAL]RE: MT7-04 Intermediate Cement Sonic Log Date:Friday, May 21, 2021 4:58:53 PM Attachments:ConocoPhillips Alaska, Inc_Greater Mooses Tooth_MT7-04_TOC_5420ft_11710ft.pdf FYI Sent from my iPhone Begin forwarded message: From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Date: May 21, 2021 at 2:52:31 PM AKDT To: "Loepp, Victoria T (CED)" <victoria.loepp@alaska.gov>, "Hobbs, Greg S" <Greg.S.Hobbs@conocophillips.com> Cc: "Njoku, Johnson" <Johnson.Njoku@conocophillips.com>, "Brillon, Chris L" <Chris.L.Brillon@conocophillips.com>, "Gorham, Brad" <Brad.Gorham@conocophillips.com>, WSC Rig Advisor <wscrigadvisor@conocophillips.com> Subject: RE: [EXTERNAL]RE: MT7-04 Intermediate Cement Sonic Log Victoria, Please see attached. Thanks, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) -----Original Message----- From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Friday, May 21, 2021 2:10 PM To: WSC Operations Engineer <wscopsengineer@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: [EXTERNAL]RE: MT7-04 Intermediate Cement Sonic Log Could you please provide interpretation and explanation of this log from the Schlumberger analyst? Thanx, Victoria -----Original Message----- From: Loepp, Victoria T (CED) Sent: Friday, May 21, 2021 12:52 PM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: MT7-04 Intermediate Cement Sonic Log Justin/Keith, Approval is granted to proceed. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov -----Original Message----- From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Sent: Friday, May 21, 2021 11:48 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Brillon, Chris L <Chris.L.Brillon@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: RE: [EXTERNAL]Re: MT7-04 Intermediate Cement Sonic Log Hi Victoria, Attached is the current well schematic for MT7-04. The Alpine C formation top is at 11,673.56' MD / 8,345.7' TVD. If there is anything else you need or we can do please let me know. Thank you for your help, we appreciate it. Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) -----Original Message----- From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Friday, May 21, 2021 10:37 AM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Subject: [EXTERNAL]Re: MT7-04 Intermediate Cement Sonic Log CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Please send schematic. Sent from my iPhone On May 21, 2021, at 9:55 AM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote: Good Morning Victoria/Mutasim, Attached is the sonic log for the MT7-04 intermediate cement operation and the cement job report. Top of cement is at 10,605’ MD. Currently we’re running in hole to set a packer in the intermediate casing to perform our casing test to 3,500psi. After successful test, we will trip out of hole, pick up production drilling BHA and run in hole, drill 20ft of new formation, perform FIT and drill ahead. Please let us know if you have any questions, otherwise we will proceed after out of hole. As usual we will continue to keep you posted on MT7-04 drilling operation progress. Thank you, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com<mailto:wscopsengineer@conocophillips.com> 907.263.4544 (Office) [cid:image001.png@01D74E21.C8E11340] Summary: Apparent TOC of Poor Quality Cement is identified at a depth of approx. 10605 ft, as the casing amplitude is considerably high and casing arrivals become consistently strong above this depth. Some formation arrivals are observed from 5420 ft – 6600 ft, probably because of high deviation and no centralizers, leading casing to reside on the lower side of wellbore. Top of Cement Evaluation Apparent Top of Poor Quality Cement ~ 10605 ft From:WSC Operations Engineer To:Loepp, Victoria T (OGC) Cc:Hobbs, Greg S; Njoku, Johnson; Brillon, Chris L; Gorham, Brad; WSC Rig Advisor Subject:RE: [EXTERNAL]MT7-04 Intermediate Cement Sonic Log Date:Friday, May 21, 2021 4:46:19 PM Hi Victoria, We estimate there is approximately 160 ft total of good quality cement bond spread over 4 separate intervals listed below. 10,950 FTMD - 10,980 FTMD 10,910 FTMD - 10,920 FTMD 10,790 FTMD - 10,850 FTMD 10,690 FTMD - 10,750 FTMD In addition, there is evidence of cement from the lowest interval to the casing shoe, and there is a possibility of cement continuing to build compressive strength with time to improve isolation. With this evidence, we are confident there is adequate isolation based on the cement logs as shown. We have consulted with our global cementing subject matter expert in Houston and he agreed with our assessment. In the future, we will be sure to provide you with CAPI's interpretation for future wells. Thanks, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) -----Original Message----- From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Friday, May 21, 2021 3:16 PM To: WSC Operations Engineer <wscopsengineer@conocophillips.com> Cc: Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com>; Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Brillon, Chris L <Chris.L.Brillon@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com> Subject: [EXTERNAL]MT7-04 Intermediate Cement Sonic Log Is there any good cement? How many feet would you estimate? Does CPAI believe that there is adequate isolation? Please explain. Let’s flush this out before proceeding. In the future, please provide CPAI’s interpretation of the log results and cement job results. Thanx, Victoria Sent from my iPhone > On May 21, 2021, at 2:52 PM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote: > > Victoria, > > Please see attached. > > Thanks, > Polaris – WSC Operations Engineer > Justin Brady / Keith Herring > wscopsengineer@conocophillips.com > 907.263.4544 (Office) > > > > > -----Original Message----- > From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> > Sent: Friday, May 21, 2021 2:10 PM > To: WSC Operations Engineer <wscopsengineer@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> > Subject: [EXTERNAL]RE: MT7-04 Intermediate Cement Sonic Log > > Could you please provide interpretation and explanation of this log from the Schlumberger analyst? > > Thanx, > Victoria > > -----Original Message----- > From: Loepp, Victoria T (CED) > Sent: Friday, May 21, 2021 12:52 PM > To: WSC Operations Engineer <wscopsengineer@conocophillips.com> > Subject: MT7-04 Intermediate Cement Sonic Log > > Justin/Keith, > > Approval is granted to proceed. > > Thanx, > Victoria > > Victoria Loepp > Senior Petroleum Engineer > State of Alaska > Oil & Gas Conservation Commission > 333 W. 7th Ave > Anchorage, AK 99501 > Work: (907)793-1247 > Victoria.Loepp@alaska.gov > > CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov > > > > -----Original Message----- > From: WSC Operations Engineer <wscopsengineer@conocophillips.com> > Sent: Friday, May 21, 2021 11:48 AM > To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> > Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Brillon, Chris L <Chris.L.Brillon@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> > Subject: RE: [EXTERNAL]Re: MT7-04 Intermediate Cement Sonic Log > > Hi Victoria, > > Attached is the current well schematic for MT7-04. > > The Alpine C formation top is at 11,673.56' MD / 8,345.7' TVD. > > If there is anything else you need or we can do please let me know. > > Thank you for your help, we appreciate it. > > Polaris – WSC Operations Engineer > Justin Brady / Keith Herring > wscopsengineer@conocophillips.com > 907.263.4544 (Office) > > > > > > > -----Original Message----- > From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> > Sent: Friday, May 21, 2021 10:37 AM > To: WSC Operations Engineer <wscopsengineer@conocophillips.com> > Subject: [EXTERNAL]Re: MT7-04 Intermediate Cement Sonic Log > > CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. > > > > Please send schematic. > > Sent from my iPhone > >> On May 21, 2021, at 9:55 AM, WSC Operations Engineer <wscopsengineer@conocophillips.com> wrote: >> Good Morning Victoria/Mutasim, >> Attached is the sonic log for the MT7-04 intermediate cement operation and the cement job report. Top of cement is at 10,605’ MD. >> Currently we’re running in hole to set a packer in the intermediate casing to perform our casing test to 3,500psi. After successful test, we will trip out of hole, pick up production drilling BHA and run in hole, drill 20ft of new formation, perform FIT and drill ahead. >> Please let us know if you have any questions, otherwise we will proceed after out of hole. As usual we will continue to keep you posted on MT7-04 drilling operation progress. >> Thank you, >> Polaris – WSC Operations Engineer >> Justin Brady / Keith Herring >> wscopsengineer@conocophillips.com<mailto:wscopsengineer@conocophillips.com> >> 907.263.4544 (Office) >> [cid:image001.png@01D74E21.C8E11340] > <ConocoPhillips Alaska, Inc_Greater Mooses Tooth_MT7-04_TOC_5420ft_11710ft.pdf> From:Elganzoory, Mutasim H To:WSC Operations Engineer; Loepp, Victoria T (OGC) Cc:Njoku, Johnson; Hobbs, Greg S; WSC Rig Advisor; Gorham, Brad; BLM_AK_AKSO_EnergySection_Notifications Subject:Re: [EXTERNAL] MT7-04 Intermediate Cement Sonic Log Date:Friday, May 21, 2021 3:59:16 PM Attachments:image001.png Outlook-l15epehb.png Justin and Keith, We are recorded the TOC for the intermediate casing for this well at 10,605' MD, 7,979' TVD, which is meet and exceed the BLM standards and OO#2. No sundry or change to APD are required at this point, Please record those changes on the well completion report WCR. Also, plese include this email address on the BLM notification, It is our team email: BLM_AK_AKSO_EnergySection_Notifications@blm.gov Thank you Sincerely, Tas Mutasim Elganzoory PETROLEUM ENGINEER BLM-ALASKA STATE OFFICE - BRANCH OF ENERGY AND MINERALS OFFICE: (907) 271-4224; FAX: (907) 271-3933 melganzoory@blm.gov From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Sent: Friday, May 21, 2021 9:54 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>; Elganzoory, Mutasim H <melganzoory@blm.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: [EXTERNAL] MT7-04 Intermediate Cement Sonic Log This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Good Morning Victoria/Mutasim, Attached is the sonic log for the MT7-04 intermediate cement operation and the cement job report. Top of cement is at 10,605’ MD. Currently we’re running in hole to set a packer in the intermediate casing to perform our casing test to 3,500psi. After successful test, we will trip out of hole, pick up production drilling BHA and run in hole, drill 20ft of new formation, perform FIT and drill ahead. Please let us know if you have any questions, otherwise we will proceed after out of hole. As usual we will continue to keep you posted on MT7-04 drilling operation progress. Thank you, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) From:WSC Operations Engineer To:Loepp, Victoria T (OGC); Elganzoory, Mutasim Cc:Njoku, Johnson; Hobbs, Greg S; WSC Rig Advisor; Gorham, Brad Subject:MT7-04 Intermediate Cement Sonic Log Date:Friday, May 21, 2021 9:55:01 AM Attachments:image001.png CPAI_MT7-04_SonicScope_RM_TOC_1.2MD_5420-17710ft.Pdf MT7-04 Intermediate Plot Report (1).pdf Good Morning Victoria/Mutasim, Attached is the sonic log for the MT7-04 intermediate cement operation and the cement job report. Top of cement is at 10,605’ MD. Currently we’re running in hole to set a packer in the intermediate casing to perform our casing test to 3,500psi. After successful test, we will trip out of hole, pick up production drilling BHA and run in hole, drill 20ft of new formation, perform FIT and drill ahead. Please let us know if you have any questions, otherwise we will proceed after out of hole. As usual we will continue to keep you posted on MT7-04 drilling operation progress. Thank you, Polaris – WSC Operations Engineer Justin Brady / Keith Herring wscopsengineer@conocophillips.com 907.263.4544 (Office) 05/17/2021 05:49:28 Cementing Job Report CemCAT v1.7 Well MT7-04 Field Alpine Engineer Country United States Client CPAI SIR No. Job Type Intermediate Job Date 05-16-2021 Time 05/16/2021 16:22:59 05/17/2021 04:38:31 hh:mm:ss 16:22:59 17:13:00 18:03:00 18:53:00 19:43:00 20:33:00 21:23:00 22:13:00 23:03:00 23:53:00 00:43:00 01:33:00 02:23:00 03:13:00 04:03:00 04:38:31 Pressure PSI 0.00 600 1200 1800 2400 3000 Rate B/M 0.00 2.0 4.0 6.0 8.0 10.0 Density LB/G 0.00 3.6 7.2 10.8 14.4 18.0 WHP PSI 0.00 1000 2000 3000 4000 5000 Messages PJSM water ahead Low PT Check Trips High PT Reset Total, Vol = 5.06 bbl Start MudPush Loading Bottom Plug Batch Cement Reset Total, Vol = 60.00 bbl Reset Total, Vol = 0.00 bbl Start Cement Slurry End Cement Slurry Loading Top Plug Water Behind Reset Total, Vol = 75.02 bbl Shut down, 20 bbls away from Dis tank count. Rig to Displace 5110 Strokes away Didn't bump Plug Customer CPAI Job Number Well MT7-04 Location (legal) Moosestooth Schlumberger Location Job Start May/16/2021 Field Alpine Formation Name/Type Deviation deg Bit Size in Well MD ft Well TVD ft County State/Province Alaska Well Master API/UWI BHP psi BHST degF BHCT degF Pore Press. Gradient lb/gal Rig Name Drilled For Service Via Offshore Zone Well Class Well Type Drilling Fluid Type Max. Density lb/gal Plastic Viscosity cP Service Line Cementing Job Type Intermediate Max. Allowed Tub. Press psi Max. Allowed Ann. Press psi WH Connection Service Instructions Treat Down Displacement bbl Packer Type Packer Depth ft Tubing Vol. bbl Casing Vol. bbl Annular Vol. bbl Openhole Vol. bbl Casing/Tubing Secured 1 Hole Vol. Circulated prior to Cement Casing Tools Squeeze Job Lift Pressure psi Shoe Type Squeeze Type Pipe Rotated Pipe Reciprocated Shoe Depth ft Tool Type No. Centralizers Top Plugs Bottom Plugs Stage Tool Type Tool Depth ft Cement Head Type Stage Tool Depth ft Tail Pipe Size in Job Scheduled For May/16/2021 Arrived on Location May/16/2021 Leave Location May/16/2021 Collar Type Tail Pipe Depth ft Collar Depth ft Sqz. Total Vol. bbl Casing/Liner Depth, ft Size, in Weight, lb/ft Grade Thread Tubing/Drill Pipe T/D Depth, ft Size, in Weight, lb/ft Grade Thread Perforations/Open Hole Top, ft Bottom, ft shot/ft No. of Shots Total Interval ft ft ft ft ft Diameter in ft ft Cementing Service Report Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 16:22:59 -7 0.0 4.51 0.0 0.0 417 Started Acquisition 05/16/2021 16:23:20 -5 0.0 4.51 0.0 0.0 421 PJSM 05/16/2021 16:24:14 -10 0.0 4.51 0.0 0.0 380 05/16/2021 16:25:29 -10 0.0 4.51 0.0 0.0 81 05/16/2021 16:26:44 -10 0.0 4.51 0.0 0.0 71 05/16/2021 16:27:59 -12 0.0 4.51 0.0 0.0 72 05/16/2021 16:29:14 45 0.3 4.51 0.4 0.4 98 05/16/2021 16:29:22 50 0.9 4.51 0.5 0.5 106 water ahead 05/16/2021 16:30:29 326 1.0 4.51 1.7 1.7 358 05/16/2021 16:31:44 339 1.0 4.51 2.9 2.9 391 05/16/2021 16:32:59 374 1.0 4.51 4.2 4.2 419 05/16/2021 16:34:14 303 0.0 4.51 5.0 5.0 365 05/16/2021 16:34:30 301 0.0 4.50 5.0 5.0 363 Low PT Check Trips 05/16/2021 16:35:29 671 0.0 4.51 5.0 5.0 734 05/16/2021 16:35:34 669 0.0 4.51 5.0 5.0 735 High PT 05/16/2021 16:36:44 3908 0.0 4.50 5.0 5.0 3973 05/16/2021 16:37:59 2414 0.0 4.50 5.0 5.0 2481 05/16/2021 16:39:14 4294 0.0 4.50 5.1 5.1 4365 05/16/2021 16:39:59 4282 0.0 4.50 5.1 5.1 4355 Reset Total, Vol = 5.06 bbl 05/16/2021 16:40:29 3233 0.0 4.50 0.0 5.1 3267 05/16/2021 16:41:44 14 0.0 4.50 0.0 5.1 196 Page 1 of 12 Customer CPAI Job Number Well MT7-04 Location (legal) Moosestooth Schlumberger Location Job Start May/16/2021 Field Alpine Formation Name/Type Deviation deg Bit Size in Well MD ft Well TVD ft County State/Province Alaska Well Master API/UWI BHP psi BHST degF BHCT degF Pore Press. Gradient lb/gal Rig Name Drilled For Service Via Offshore Zone Well Class Well Type Drilling Fluid Type Max. Density lb/gal Plastic Viscosity cP Service Line Cementing Job Type Intermediate Max. Allowed Tub. Press psi Max. Allowed Ann. Press psi WH Connection Service Instructions Treat Down Displacement bbl Packer Type Packer Depth ft Tubing Vol. bbl Casing Vol. bbl Annular Vol. bbl Openhole Vol. bbl Casing/Tubing Secured 1 Hole Vol. Circulated prior to Cement Casing Tools Squeeze Job Lift Pressure psi Shoe Type Squeeze Type Pipe Rotated Pipe Reciprocated Shoe Depth ft Tool Type No. Centralizers Top Plugs Bottom Plugs Stage Tool Type Tool Depth ft Cement Head Type Stage Tool Depth ft Tail Pipe Size in Job Scheduled For May/16/2021 Arrived on Location May/16/2021 Leave Location May/16/2021 Collar Type Tail Pipe Depth ft Collar Depth ft Sqz. Total Vol. bbl Casing/Liner Depth, ft Size, in Weight, lb/ft Grade Thread Tubing/Drill Pipe T/D Depth, ft Size, in Weight, lb/ft Grade Thread Perforations/Open Hole Top, ft Bottom, ft shot/ft No. of Shots Total Interval ft ft ft ft ft Diameter in ft ft Cementing Service Report Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 16:44:14 114 0.0 12.05 0.0 5.1 204 05/16/2021 16:45:09 79 0.0 11.90 0.0 5.1 206 Start MudPush 05/16/2021 16:45:29 134 0.0 11.89 0.0 5.1 209 05/16/2021 16:46:44 245 1.0 11.60 0.8 5.8 316 05/16/2021 16:47:59 299 1.0 11.59 2.0 7.1 354 05/16/2021 16:49:14 287 1.0 11.48 3.3 8.3 352 05/16/2021 16:50:29 336 1.0 11.37 4.5 9.6 373 05/16/2021 16:51:44 307 1.0 11.86 5.8 10.9 368 05/16/2021 16:52:59 300 1.0 11.51 7.1 12.1 370 05/16/2021 16:54:14 350 1.0 11.45 8.3 13.4 391 05/16/2021 16:55:29 311 1.0 11.50 9.6 14.6 379 05/16/2021 16:56:44 349 1.0 11.47 10.8 15.9 386 05/16/2021 16:57:59 345 1.0 12.02 12.1 17.2 387 05/16/2021 16:59:14 337 1.0 11.42 13.3 18.4 386 05/16/2021 17:00:29 359 1.0 11.32 14.6 19.7 393 05/16/2021 17:01:44 369 1.0 11.27 15.9 20.9 405 05/16/2021 17:02:59 339 1.0 11.46 17.1 22.2 393 05/16/2021 17:04:14 364 1.0 11.25 18.4 23.4 399 05/16/2021 17:05:29 348 1.0 11.45 19.6 24.7 395 05/16/2021 17:06:44 333 1.0 11.55 20.9 26.0 387 05/16/2021 17:07:59 323 1.0 11.35 22.2 27.2 387 05/16/2021 17:09:14 336 1.0 11.37 23.4 28.5 388 05/16/2021 17:10:29 345 1.0 11.25 24.7 29.7 400 05/16/2021 17:11:44 328 1.0 11.32 25.9 31.0 391 05/16/2021 17:12:59 350 1.0 11.43 27.2 32.3 400 05/16/2021 17:14:14 316 1.0 11.55 28.4 33.5 400 05/16/2021 17:15:29 348 1.0 11.61 29.7 34.8 403 05/16/2021 17:16:44 339 1.0 11.35 31.0 36.0 412 05/16/2021 17:17:59 350 1.0 11.45 32.2 37.3 425 05/16/2021 17:19:14 388 1.0 11.34 33.5 38.5 440 05/16/2021 17:20:29 361 1.0 11.28 34.7 39.8 439 05/16/2021 17:21:44 381 1.0 11.41 36.0 41.1 450 05/16/2021 17:22:59 415 1.0 11.50 37.3 42.3 465 05/16/2021 17:24:14 380 1.0 11.24 38.5 43.6 461 05/16/2021 17:25:29 456 1.0 11.31 39.8 44.8 486 05/16/2021 17:26:44 388 1.0 11.70 41.0 46.1 452 05/16/2021 17:27:59 443 1.0 11.38 42.3 47.3 474 05/16/2021 17:29:14 458 1.0 11.44 43.5 48.6 490 05/16/2021 17:30:29 404 1.0 11.44 44.8 49.9 477 05/16/2021 17:31:44 461 1.0 11.35 46.1 51.1 484 05/16/2021 17:32:59 435 1.0 11.41 47.3 52.4 480 05/16/2021 17:34:14 451 1.0 11.21 48.6 53.6 487 05/16/2021 17:35:29 476 1.0 11.54 49.8 54.9 502 05/16/2021 17:36:44 393 1.0 11.51 51.1 56.2 450 05/16/2021 17:37:59 445 1.0 11.41 52.4 57.4 475 05/16/2021 17:39:14 448 1.0 11.33 53.6 58.7 479 05/16/2021 17:40:29 405 1.0 11.39 54.9 59.9 460 05/16/2021 17:41:44 460 1.0 11.51 56.1 61.2 483 05/16/2021 17:42:59 414 1.0 11.40 57.4 62.4 464 05/16/2021 17:44:14 417 1.0 11.42 58.6 63.7 466 05/16/2021 17:45:29 423 1.0 11.45 59.9 65.0 534 05/16/2021 17:46:44 316 0.0 11.45 60.0 65.1 457 05/16/2021 17:47:14 310 0.0 11.45 60.0 65.1 484 Loading Bottom Plug 05/16/2021 17:47:59 303 0.0 8.73 60.0 65.1 472 Page 2 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 17:50:29 273 0.0 8.39 60.0 65.1 439 05/16/2021 17:50:38 275 0.0 9.01 60.0 65.1 452 Batch Cement 05/16/2021 17:51:44 267 0.0 13.53 60.0 65.1 451 05/16/2021 17:51:55 263 0.0 13.54 60.0 65.1 437 Reset Total, Vol = 60.00 bbl 05/16/2021 17:52:59 257 0.0 13.54 0.0 65.1 433 05/16/2021 17:54:14 245 0.0 13.55 0.0 65.1 443 05/16/2021 17:55:29 238 0.0 13.55 0.0 65.1 447 05/16/2021 17:56:44 231 0.0 13.55 0.0 65.1 420 05/16/2021 17:57:59 228 0.0 13.56 0.0 65.1 408 05/16/2021 17:59:14 219 0.0 13.54 0.0 65.1 404 05/16/2021 18:00:29 210 0.0 14.90 0.0 65.1 407 05/16/2021 18:01:44 201 0.0 15.44 0.0 65.1 409 05/16/2021 18:02:59 195 0.0 15.97 0.0 65.1 405 05/16/2021 18:04:14 191 0.0 15.89 0.0 65.1 414 05/16/2021 18:05:29 188 0.0 15.86 0.0 65.1 410 05/16/2021 18:06:44 184 0.0 15.85 0.0 65.1 414 05/16/2021 18:07:59 180 0.0 15.81 0.0 65.1 413 05/16/2021 18:09:14 172 0.0 15.80 0.0 65.1 387 05/16/2021 18:10:29 172 0.0 15.81 0.0 65.1 414 05/16/2021 18:11:19 65 0.0 15.81 0.0 65.1 189 Start Cement Slurry 05/16/2021 18:11:44 215 0.0 15.81 0.0 65.1 308 05/16/2021 18:12:59 281 1.0 15.72 1.1 66.1 365 05/16/2021 18:14:14 306 1.0 15.84 2.3 67.4 381 05/16/2021 18:15:29 298 1.0 15.82 3.6 68.7 341 05/16/2021 18:16:44 291 1.0 15.74 4.9 69.9 349 05/16/2021 18:17:59 257 1.0 15.96 6.1 71.2 330 05/16/2021 18:19:14 268 1.0 15.63 7.4 72.4 345 05/16/2021 18:20:29 258 1.0 15.67 8.6 73.7 318 05/16/2021 18:21:44 246 1.0 15.67 9.9 75.0 266 05/16/2021 18:22:59 255 1.0 15.86 11.1 76.2 268 05/16/2021 18:24:14 234 1.0 15.75 12.4 77.5 252 05/16/2021 18:25:29 240 1.0 15.82 13.7 78.7 259 05/16/2021 18:26:44 232 1.0 15.91 14.9 80.0 246 05/16/2021 18:27:59 210 1.0 15.57 16.2 81.2 239 05/16/2021 18:29:14 250 1.0 15.78 17.4 82.5 246 05/16/2021 18:30:29 210 1.0 16.01 18.7 83.8 230 05/16/2021 18:31:44 194 1.0 15.81 20.0 85.0 221 05/16/2021 18:32:59 205 1.0 15.83 21.2 86.3 217 05/16/2021 18:34:14 160 1.0 15.58 22.5 87.5 200 05/16/2021 18:35:29 198 1.0 15.70 23.7 88.8 210 05/16/2021 18:36:44 151 1.0 15.55 25.0 90.1 193 05/16/2021 18:37:59 187 1.0 15.87 26.2 91.3 194 05/16/2021 18:39:14 177 1.0 15.82 27.5 92.6 203 05/16/2021 18:40:29 156 1.0 15.75 28.8 93.8 198 05/16/2021 18:41:44 179 1.0 16.06 30.0 95.1 197 05/16/2021 18:42:59 140 1.0 15.73 31.3 96.3 171 05/16/2021 18:44:14 152 1.0 15.37 32.5 97.6 174 05/16/2021 18:45:29 127 1.0 15.65 33.8 98.9 159 05/16/2021 18:46:44 154 1.0 16.10 35.1 100.1 166 05/16/2021 18:47:59 160 1.0 15.88 36.3 101.4 171 05/16/2021 18:49:14 146 1.0 15.62 37.6 102.6 180 05/16/2021 18:50:29 148 1.0 15.56 38.8 103.9 168 05/16/2021 18:51:44 148 1.0 15.77 40.1 105.2 175 05/16/2021 18:52:59 157 1.0 16.24 41.3 106.4 157 Page 3 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 18:55:29 133 1.0 15.75 43.9 108.9 133 05/16/2021 18:56:44 112 1.0 15.74 45.1 110.2 120 05/16/2021 18:57:59 106 1.0 16.06 46.4 111.4 124 05/16/2021 18:59:14 124 1.0 15.81 47.6 112.7 124 05/16/2021 19:00:29 107 1.0 15.73 48.9 114.0 120 05/16/2021 19:01:44 93 1.0 15.92 50.1 115.2 106 05/16/2021 19:02:59 94 1.0 15.81 51.4 116.5 103 05/16/2021 19:04:14 91 1.0 15.64 52.7 117.7 107 05/16/2021 19:05:29 100 1.0 16.12 53.9 119.0 103 05/16/2021 19:06:44 95 1.0 15.79 55.2 120.2 101 05/16/2021 19:07:59 94 1.0 15.86 56.4 121.5 100 05/16/2021 19:09:14 101 1.0 15.97 57.7 122.8 113 05/16/2021 19:10:29 95 1.0 15.94 59.0 124.0 99 05/16/2021 19:11:44 93 1.0 15.84 60.2 125.3 99 05/16/2021 19:12:59 96 1.0 15.95 61.5 126.5 99 05/16/2021 19:14:14 97 1.0 15.92 62.7 127.8 98 05/16/2021 19:15:29 96 1.0 15.79 64.0 129.1 101 05/16/2021 19:16:44 97 1.0 16.01 65.2 130.3 100 05/16/2021 19:17:59 102 1.0 15.94 66.5 131.6 97 05/16/2021 19:19:14 96 1.0 16.25 67.8 132.8 101 05/16/2021 19:20:29 100 1.0 16.07 69.0 134.1 98 05/16/2021 19:21:44 105 1.0 16.02 70.3 135.3 102 05/16/2021 19:22:59 98 1.0 16.06 71.5 136.6 103 05/16/2021 19:24:14 101 1.0 15.92 72.8 137.9 101 05/16/2021 19:25:29 125 1.0 15.66 74.1 139.1 102 05/16/2021 19:26:44 39 0.0 15.67 75.0 140.1 187 05/16/2021 19:26:54 9 0.0 15.66 75.0 140.1 151 End Cement Slurry 05/16/2021 19:27:59 -0 0.0 15.67 75.0 140.1 175 05/16/2021 19:29:14 -3 0.0 15.67 75.0 140.1 141 05/16/2021 19:29:52 -3 0.0 15.67 75.0 140.1 139 Loading Top Plug 05/16/2021 19:30:29 -1 0.0 15.67 75.0 140.1 152 05/16/2021 19:31:44 1 0.0 15.67 75.0 140.1 160 05/16/2021 19:32:59 -1 0.0 15.68 75.0 140.1 149 05/16/2021 19:34:14 -0 0.0 15.67 75.0 140.1 150 05/16/2021 19:35:29 10 0.0 15.68 75.0 140.1 233 05/16/2021 19:36:44 -0 0.0 15.68 75.0 140.1 147 05/16/2021 19:37:54 2 0.0 15.68 75.0 140.1 158 Water Behind 05/16/2021 19:37:58 -0 0.0 15.68 75.0 140.1 158 Reset Total, Vol = 75.02 bbl 05/16/2021 19:37:59 3 0.0 15.68 0.0 140.1 161 05/16/2021 19:39:14 104 1.0 15.68 0.5 140.5 180 05/16/2021 19:40:29 43 1.0 15.68 1.7 141.8 149 05/16/2021 19:41:44 25 1.0 15.68 3.0 143.1 138 05/16/2021 19:42:59 23 1.0 15.68 4.2 144.3 140 05/16/2021 19:44:14 20 1.0 15.69 5.5 145.6 136 05/16/2021 19:45:29 19 1.0 15.69 6.8 146.8 133 05/16/2021 19:46:44 19 1.0 15.69 8.0 148.1 143 05/16/2021 19:47:59 14 1.0 15.69 9.3 149.4 77 05/16/2021 19:49:14 53 1.0 15.69 10.5 150.6 82 05/16/2021 19:50:29 65 1.0 15.69 11.8 151.9 81 05/16/2021 19:51:44 64 1.0 15.69 13.0 153.1 83 05/16/2021 19:52:59 66 1.0 15.69 14.3 154.4 82 05/16/2021 19:54:14 12 0.0 15.70 15.4 155.4 77 05/16/2021 19:55:29 8 0.0 15.69 15.4 155.4 72 05/16/2021 19:55:32 9 0.0 15.69 15.4 155.4 81 Shut down, 20 bbls away from Dis tank count. Page 4 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 19:57:59 8 0.0 10.68 15.4 155.4 124 05/16/2021 19:59:14 112 0.0 10.15 15.4 155.4 128 05/16/2021 20:00:29 12 0.0 9.66 15.4 155.4 129 05/16/2021 20:01:44 -4 0.0 10.72 15.4 155.4 127 05/16/2021 20:02:59 -5 0.0 9.44 15.4 155.4 128 05/16/2021 20:04:14 -8 0.0 9.41 15.4 155.4 120 05/16/2021 20:05:29 -5 0.0 9.27 15.4 155.4 128 05/16/2021 20:06:44 -7 0.0 8.77 15.4 155.4 140 05/16/2021 20:07:59 -10 0.0 8.53 15.4 155.4 132 05/16/2021 20:09:14 -5 0.0 8.54 15.4 155.4 132 05/16/2021 20:10:29 -9 0.0 8.54 15.4 155.4 133 05/16/2021 20:11:44 -8 0.0 8.54 15.4 155.4 119 05/16/2021 20:12:59 -7 0.0 8.44 15.4 155.4 123 05/16/2021 20:14:14 -8 0.0 8.34 15.4 155.4 121 05/16/2021 20:15:29 -9 0.0 8.31 15.4 155.4 118 05/16/2021 20:16:44 -7 0.0 8.31 15.4 155.4 123 05/16/2021 20:17:59 -9 0.0 8.31 15.4 155.4 125 05/16/2021 20:19:14 -7 0.0 8.22 15.4 155.4 121 05/16/2021 20:20:29 -7 0.0 8.21 15.4 155.4 122 05/16/2021 20:21:44 -8 0.0 8.21 15.4 155.4 119 05/16/2021 20:22:59 -4 0.0 8.20 15.4 155.4 118 05/16/2021 20:24:14 167 0.0 8.20 15.4 155.4 115 05/16/2021 20:25:29 85 0.0 8.20 15.4 155.4 120 05/16/2021 20:26:44 53 0.0 8.20 15.4 155.4 120 05/16/2021 20:27:59 94 0.0 8.20 15.4 155.4 120 05/16/2021 20:29:14 78 0.0 8.20 15.4 155.4 120 05/16/2021 20:30:29 15 0.0 8.20 15.4 155.4 119 05/16/2021 20:31:44 87 0.0 8.19 15.4 155.4 119 05/16/2021 20:32:59 -1 0.0 8.19 15.4 155.4 121 05/16/2021 20:34:14 -0 0.0 8.18 15.4 155.4 119 05/16/2021 20:35:29 -3 0.0 8.18 15.4 155.4 119 05/16/2021 20:36:44 -3 0.0 8.18 15.4 155.4 116 05/16/2021 20:37:59 -5 0.0 7.17 15.4 155.4 118 05/16/2021 20:39:14 -3 0.0 7.01 15.4 155.4 120 05/16/2021 20:40:29 -3 0.0 6.79 15.4 155.4 120 05/16/2021 20:41:44 -7 0.0 0.00 15.4 155.4 117 05/16/2021 20:42:59 -7 0.0 0.00 15.4 155.4 117 05/16/2021 20:44:14 -5 0.0 0.00 15.4 155.4 120 05/16/2021 20:45:29 -5 0.0 0.01 15.4 155.4 119 05/16/2021 20:46:44 -8 0.0 0.00 15.4 155.4 118 05/16/2021 20:47:59 -9 0.0 0.00 15.4 155.4 117 05/16/2021 20:49:14 -7 0.0 0.00 15.4 155.4 118 05/16/2021 20:50:29 -7 0.0 0.00 15.4 155.4 120 05/16/2021 20:51:44 -9 0.0 0.00 15.4 155.4 118 05/16/2021 20:52:59 -7 0.0 0.00 15.4 155.4 118 05/16/2021 20:54:14 -5 0.0 0.01 15.4 155.4 120 05/16/2021 20:55:29 -9 0.0 0.01 15.4 155.4 117 05/16/2021 20:56:44 -6 0.0 -0.00 15.4 155.4 116 05/16/2021 20:57:59 -7 0.0 0.00 15.4 155.4 116 05/16/2021 20:59:14 -5 0.0 0.00 15.4 155.4 117 05/16/2021 21:00:29 -6 0.0 0.00 15.4 155.4 117 05/16/2021 21:01:44 -7 0.0 0.00 15.4 155.4 122 05/16/2021 21:02:59 -5 0.0 0.00 15.4 155.4 115 05/16/2021 21:04:14 -3 0.0 0.00 15.4 155.4 118 Page 5 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 21:06:44 -8 0.0 0.00 15.4 155.4 124 05/16/2021 21:07:59 -9 0.0 0.01 15.4 155.4 120 05/16/2021 21:09:14 -7 0.0 0.00 15.4 155.4 119 05/16/2021 21:10:29 -7 0.0 0.01 15.4 155.4 120 05/16/2021 21:11:44 -8 0.0 0.00 15.4 155.4 122 05/16/2021 21:12:59 -10 0.0 0.01 15.4 155.4 122 05/16/2021 21:14:14 -9 0.0 0.00 15.4 155.4 120 05/16/2021 21:15:29 -5 0.0 0.01 15.4 155.4 119 05/16/2021 21:16:44 -9 0.0 0.01 15.4 155.4 120 05/16/2021 21:17:59 -9 0.0 0.00 15.4 155.4 119 05/16/2021 21:19:14 -9 0.0 0.00 15.4 155.4 122 05/16/2021 21:20:29 -7 0.0 0.00 15.4 155.4 118 05/16/2021 21:21:44 -8 0.0 0.00 15.4 155.4 123 05/16/2021 21:22:59 -9 0.0 0.00 15.4 155.4 120 05/16/2021 21:24:14 -9 0.0 0.01 15.4 155.4 117 05/16/2021 21:25:29 -7 0.0 0.00 15.4 155.4 122 05/16/2021 21:26:44 -11 0.0 0.01 15.4 155.4 116 05/16/2021 21:27:59 -9 0.0 0.00 15.4 155.4 121 05/16/2021 21:29:14 -10 0.0 0.00 15.4 155.4 116 05/16/2021 21:30:29 -6 0.0 0.00 15.4 155.4 118 05/16/2021 21:31:44 -8 0.0 0.00 15.4 155.4 118 05/16/2021 21:32:59 -9 0.0 0.00 15.4 155.4 116 05/16/2021 21:34:14 -7 0.0 0.00 15.4 155.4 118 05/16/2021 21:35:29 -8 0.0 0.00 15.4 155.4 118 05/16/2021 21:36:44 -7 0.0 0.00 15.4 155.4 117 05/16/2021 21:37:59 -10 0.0 0.00 15.4 155.4 120 05/16/2021 21:39:14 -9 0.0 0.00 15.4 155.4 119 05/16/2021 21:40:29 -6 0.0 0.01 15.4 155.4 118 05/16/2021 21:41:44 -8 0.0 0.00 15.4 155.4 119 05/16/2021 21:42:59 -9 0.0 0.00 15.4 155.4 124 05/16/2021 21:44:14 -8 0.0 0.01 15.4 155.4 119 05/16/2021 21:45:29 -7 0.0 0.00 15.4 155.4 122 05/16/2021 21:46:44 -11 0.0 0.00 15.4 155.4 119 05/16/2021 21:47:59 -6 0.0 0.00 15.4 155.4 117 05/16/2021 21:49:14 -7 0.0 0.00 15.4 155.4 122 05/16/2021 21:50:29 -8 0.0 0.00 15.4 155.4 121 05/16/2021 21:51:44 -9 0.0 -0.00 15.4 155.4 119 05/16/2021 21:52:59 -9 0.0 -0.00 15.4 155.4 117 05/16/2021 21:54:14 -9 0.0 0.01 15.4 155.4 122 05/16/2021 21:55:29 -9 0.0 0.00 15.4 155.4 120 05/16/2021 21:56:44 -8 0.0 0.00 15.4 155.4 121 05/16/2021 21:57:59 -8 0.0 0.00 15.4 155.4 118 05/16/2021 21:59:14 -9 0.0 0.00 15.4 155.4 120 05/16/2021 22:00:29 -9 0.0 0.00 15.4 155.4 119 05/16/2021 22:01:44 -10 0.0 -0.00 15.4 155.4 119 05/16/2021 22:02:59 -10 0.0 -0.00 15.4 155.4 121 05/16/2021 22:04:14 -6 0.0 0.01 15.4 155.4 122 05/16/2021 22:05:29 -9 0.0 -0.00 15.4 155.4 120 05/16/2021 22:06:44 -8 0.0 0.00 15.4 155.4 117 05/16/2021 22:07:59 -6 0.0 0.00 15.4 155.4 122 05/16/2021 22:09:14 -8 0.0 0.00 15.4 155.4 120 05/16/2021 22:10:29 -8 0.0 0.00 15.4 155.4 117 05/16/2021 22:11:44 -8 0.0 0.01 15.4 155.4 122 05/16/2021 22:12:59 -8 0.0 0.00 15.4 155.4 121 Page 6 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 22:15:29 -10 0.0 0.01 15.4 155.4 123 05/16/2021 22:16:44 -7 0.0 0.00 15.4 155.4 118 05/16/2021 22:17:59 -9 0.0 0.00 15.4 155.4 119 05/16/2021 22:19:14 -11 0.0 0.00 15.4 155.4 116 05/16/2021 22:20:29 -8 0.0 0.00 15.4 155.4 119 05/16/2021 22:21:44 -7 0.0 0.00 15.4 155.4 118 05/16/2021 22:22:59 -10 0.0 0.00 15.4 155.4 118 05/16/2021 22:24:14 -9 0.0 0.00 15.4 155.4 119 05/16/2021 22:25:29 -10 0.0 0.00 15.4 155.4 119 05/16/2021 22:26:44 -6 0.0 0.00 15.4 155.4 120 05/16/2021 22:27:59 -9 0.0 0.00 15.4 155.4 119 05/16/2021 22:29:14 -9 0.0 0.01 15.4 155.4 122 05/16/2021 22:30:29 -9 0.0 0.00 15.4 155.4 117 05/16/2021 22:31:44 -9 0.0 0.00 15.4 155.4 118 05/16/2021 22:32:59 -7 0.0 0.00 15.4 155.4 123 05/16/2021 22:34:14 -9 0.0 0.01 15.4 155.4 118 05/16/2021 22:35:29 -9 0.0 0.00 15.4 155.4 119 05/16/2021 22:36:44 -7 0.0 0.00 15.4 155.4 118 05/16/2021 22:37:59 -6 0.0 0.01 15.4 155.4 119 05/16/2021 22:39:14 -8 0.0 0.00 15.4 155.4 118 05/16/2021 22:40:29 -9 0.0 0.00 15.4 155.4 118 05/16/2021 22:41:44 -9 0.0 0.01 15.4 155.4 119 05/16/2021 22:42:59 -8 0.0 0.00 15.4 155.4 118 05/16/2021 22:44:14 -9 0.0 0.00 15.4 155.4 118 05/16/2021 22:45:29 -9 0.0 0.01 15.4 155.4 116 05/16/2021 22:46:44 -8 0.0 0.00 15.4 155.4 116 05/16/2021 22:47:59 -8 0.0 0.00 15.4 155.4 116 05/16/2021 22:49:14 -10 0.0 0.00 15.4 155.4 118 05/16/2021 22:50:29 -10 0.0 0.00 15.4 155.4 118 05/16/2021 22:51:44 -10 0.0 0.01 15.4 155.4 120 05/16/2021 22:52:59 -9 0.0 0.00 15.4 155.4 118 05/16/2021 22:54:14 -8 0.0 0.00 15.4 155.4 122 05/16/2021 22:55:29 -10 0.0 0.00 15.4 155.4 117 05/16/2021 22:56:44 -12 0.0 0.00 15.4 155.4 120 05/16/2021 22:57:59 -9 0.0 0.01 15.4 155.4 119 05/16/2021 22:59:14 -12 0.0 0.00 15.4 155.4 121 05/16/2021 23:00:29 -9 0.0 0.00 15.4 155.4 118 05/16/2021 23:01:44 -8 0.0 0.00 15.4 155.4 120 05/16/2021 23:02:59 -10 0.0 -0.00 15.4 155.4 121 05/16/2021 23:04:14 -7 0.0 0.00 15.4 155.4 120 05/16/2021 23:05:29 -9 0.0 0.00 15.4 155.4 119 05/16/2021 23:06:44 -10 0.0 0.00 15.4 155.4 118 05/16/2021 23:07:59 -9 0.0 0.00 15.4 155.4 123 05/16/2021 23:09:14 -8 0.0 0.01 15.4 155.4 118 05/16/2021 23:10:29 -9 0.0 0.00 15.4 155.4 119 05/16/2021 23:11:44 -9 0.0 0.00 15.4 155.4 122 05/16/2021 23:12:59 -10 0.0 0.00 15.4 155.4 117 05/16/2021 23:14:14 -9 0.0 0.00 15.4 155.4 119 05/16/2021 23:15:29 -10 0.0 0.00 15.4 155.4 119 05/16/2021 23:16:44 -10 0.0 0.01 15.4 155.4 122 05/16/2021 23:17:59 -12 0.0 0.00 15.4 155.4 123 05/16/2021 23:19:14 -9 0.0 0.00 15.4 155.4 118 05/16/2021 23:20:29 -8 0.0 0.01 15.4 155.4 120 05/16/2021 23:21:44 -10 0.0 -0.00 15.4 155.4 117 Page 7 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/16/2021 23:24:14 -7 0.0 0.00 15.4 155.4 121 05/16/2021 23:25:29 -11 0.0 0.00 15.4 155.4 119 05/16/2021 23:26:44 -9 0.0 0.00 15.4 155.4 118 05/16/2021 23:27:59 -11 0.0 0.01 15.4 155.4 115 05/16/2021 23:29:14 -8 0.0 -0.00 15.4 155.4 117 05/16/2021 23:30:29 -8 0.0 0.00 15.4 155.4 117 05/16/2021 23:31:44 -7 0.0 0.00 15.4 155.4 118 05/16/2021 23:32:59 -11 0.0 0.00 15.4 155.4 120 05/16/2021 23:34:14 -9 0.0 0.00 15.4 155.4 120 05/16/2021 23:35:29 -8 0.0 0.00 15.4 155.4 118 05/16/2021 23:36:44 -9 0.0 0.00 15.4 155.4 120 05/16/2021 23:37:59 -10 0.0 0.00 15.4 155.4 117 05/16/2021 23:39:14 -9 0.0 0.00 15.4 155.4 118 05/16/2021 23:40:29 -10 0.0 0.00 15.4 155.4 117 05/16/2021 23:41:44 -7 0.0 0.01 15.4 155.4 119 05/16/2021 23:42:59 -7 0.0 0.00 15.4 155.4 120 05/16/2021 23:44:14 -8 0.0 0.00 15.4 155.4 123 05/16/2021 23:45:29 -7 0.0 0.00 15.4 155.4 115 05/16/2021 23:46:44 -9 0.0 0.00 15.4 155.4 120 05/16/2021 23:47:59 -10 0.0 0.00 15.4 155.4 121 05/16/2021 23:49:14 -9 0.0 0.01 15.4 155.4 120 05/16/2021 23:50:29 -9 0.0 0.00 15.4 155.4 118 05/16/2021 23:51:44 -9 0.0 0.00 15.4 155.4 119 05/16/2021 23:52:59 -7 0.0 0.00 15.4 155.4 119 05/16/2021 23:54:14 -11 0.0 0.00 15.4 155.4 120 05/16/2021 23:55:29 -8 0.0 0.00 15.4 155.4 124 05/16/2021 23:56:44 -7 0.0 0.00 15.4 155.4 120 05/16/2021 23:57:59 -10 0.0 0.00 15.4 155.4 120 05/16/2021 23:59:14 -9 0.0 0.00 15.4 155.4 123 05/17/2021 00:00:29 -11 0.0 -0.00 15.4 155.4 120 05/17/2021 00:01:44 -8 0.0 -0.00 15.4 155.4 120 05/17/2021 00:02:59 -9 0.0 0.00 15.4 155.4 120 05/17/2021 00:04:14 -9 0.0 -0.00 15.4 155.4 120 05/17/2021 00:05:29 -9 0.0 -0.00 15.4 155.4 118 05/17/2021 00:06:44 -8 0.0 0.00 15.4 155.4 119 05/17/2021 00:07:59 -8 0.0 0.01 15.4 155.4 121 05/17/2021 00:09:14 -10 0.0 0.00 15.4 155.4 123 05/17/2021 00:10:29 -9 0.0 0.00 15.4 155.4 121 05/17/2021 00:11:44 -8 0.0 0.00 15.4 155.4 123 05/17/2021 00:12:59 -9 0.0 0.00 15.4 155.4 119 05/17/2021 00:14:14 -10 0.0 0.00 15.4 155.4 120 05/17/2021 00:15:29 -10 0.0 0.00 15.4 155.4 120 05/17/2021 00:16:44 -8 0.0 0.01 15.4 155.4 121 05/17/2021 00:17:59 -11 0.0 0.01 15.4 155.4 120 05/17/2021 00:19:14 -9 0.0 0.00 15.4 155.4 123 05/17/2021 00:20:29 -10 0.0 0.01 15.4 155.4 118 05/17/2021 00:21:44 -9 0.0 0.00 15.4 155.4 121 05/17/2021 00:22:59 -13 0.0 0.00 15.4 155.4 121 05/17/2021 00:24:14 -9 0.0 0.00 15.4 155.4 123 05/17/2021 00:25:29 -11 0.0 0.00 15.4 155.4 122 05/17/2021 00:26:44 -10 0.0 0.00 15.4 155.4 125 05/17/2021 00:27:59 -9 0.0 0.00 15.4 155.4 126 05/17/2021 00:29:14 -10 0.0 0.00 15.4 155.4 124 05/17/2021 00:30:29 -9 0.0 0.00 15.4 155.4 119 Page 8 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/17/2021 00:32:59 -8 0.0 0.00 15.4 155.4 124 05/17/2021 00:34:14 -9 0.0 0.00 15.4 155.4 124 05/17/2021 00:35:29 -8 0.0 0.00 15.4 155.4 122 05/17/2021 00:36:44 -11 0.0 -0.00 15.4 155.4 123 05/17/2021 00:37:59 -9 0.0 0.00 15.4 155.4 124 05/17/2021 00:39:14 -7 0.0 0.00 15.4 155.4 120 05/17/2021 00:40:29 -9 0.0 0.00 15.4 155.4 123 05/17/2021 00:41:44 -10 0.0 0.01 15.4 155.4 122 05/17/2021 00:42:59 -7 0.0 0.00 15.4 155.4 119 05/17/2021 00:44:14 -11 0.0 0.01 15.4 155.4 120 05/17/2021 00:45:29 -9 0.0 0.01 15.4 155.4 122 05/17/2021 00:46:44 -8 0.0 0.00 15.4 155.4 121 05/17/2021 00:47:59 -8 0.0 -0.00 15.4 155.4 120 05/17/2021 00:49:14 -9 0.0 0.00 15.4 155.4 121 05/17/2021 00:50:29 -7 0.0 0.00 15.4 155.4 120 05/17/2021 00:51:44 -8 0.0 0.00 15.4 155.4 122 05/17/2021 00:52:59 -7 0.0 0.00 15.4 155.4 120 05/17/2021 00:54:14 -8 0.0 0.00 15.4 155.4 120 05/17/2021 00:55:29 -9 0.0 0.00 15.4 155.4 122 05/17/2021 00:56:44 -9 0.0 0.00 15.4 155.4 121 05/17/2021 00:57:59 -9 0.0 0.00 15.4 155.4 120 05/17/2021 00:59:14 -9 0.0 0.00 15.4 155.4 124 05/17/2021 01:00:29 -10 0.0 0.00 15.4 155.4 123 05/17/2021 01:01:44 -9 0.0 0.01 15.4 155.4 122 05/17/2021 01:02:59 -9 0.0 0.00 15.4 155.4 123 05/17/2021 01:04:14 -9 0.0 0.00 15.4 155.4 125 05/17/2021 01:05:29 -9 0.0 0.01 15.4 155.4 122 05/17/2021 01:06:44 -9 0.0 0.00 15.4 155.4 123 05/17/2021 01:07:59 -10 0.0 -0.00 15.4 155.4 123 05/17/2021 01:09:14 -9 0.0 0.00 15.4 155.4 124 05/17/2021 01:10:29 -8 0.0 0.00 15.4 155.4 126 05/17/2021 01:11:44 -9 0.0 0.00 15.4 155.4 123 05/17/2021 01:12:59 -10 0.0 0.00 15.4 155.4 124 05/17/2021 01:14:14 -10 0.0 0.00 15.4 155.4 122 05/17/2021 01:15:29 -9 0.0 0.00 15.4 155.4 126 05/17/2021 01:16:44 -10 0.0 -0.00 15.4 155.4 123 05/17/2021 01:17:59 -10 0.0 0.00 15.4 155.4 125 05/17/2021 01:19:14 -9 0.0 -0.00 15.4 155.4 121 05/17/2021 01:20:29 -8 0.0 0.00 15.4 155.4 123 05/17/2021 01:21:44 -8 0.0 -0.00 15.4 155.4 125 05/17/2021 01:22:59 -11 0.0 0.00 15.4 155.4 125 05/17/2021 01:24:14 -9 0.0 0.00 15.4 155.4 126 05/17/2021 01:25:29 -10 0.0 0.00 15.4 155.4 123 05/17/2021 01:26:44 -6 0.0 0.00 15.4 155.4 130 05/17/2021 01:27:59 -9 0.0 0.00 15.4 155.4 288 05/17/2021 01:29:14 -8 0.0 0.00 15.4 155.4 308 05/17/2021 01:30:29 -9 0.0 0.01 15.4 155.4 328 05/17/2021 01:31:44 -12 0.0 0.00 15.4 155.4 342 05/17/2021 01:32:59 -12 0.0 0.01 15.4 155.4 367 05/17/2021 01:34:14 -8 0.0 0.00 15.4 155.4 355 05/17/2021 01:35:29 -9 0.0 0.00 15.4 155.4 379 05/17/2021 01:36:44 -10 0.0 0.01 15.4 155.4 378 05/17/2021 01:37:59 -10 0.0 0.00 15.4 155.4 400 05/17/2021 01:39:14 -10 0.0 0.00 15.4 155.4 400 Page 9 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/17/2021 01:41:44 -10 0.0 0.00 15.4 155.4 409 05/17/2021 01:42:59 -11 0.0 0.01 15.4 155.4 422 05/17/2021 01:44:14 -10 0.0 0.00 15.4 155.4 424 05/17/2021 01:45:29 -8 0.0 0.00 15.4 155.4 427 05/17/2021 01:46:44 -8 0.0 0.01 15.4 155.4 426 05/17/2021 01:47:59 -10 0.0 0.00 15.4 155.4 438 05/17/2021 01:49:14 -9 0.0 0.00 15.4 155.4 437 05/17/2021 01:50:29 -11 0.0 0.00 15.4 155.4 453 05/17/2021 01:51:44 -9 0.0 0.00 15.4 155.4 458 05/17/2021 01:52:59 -8 0.0 0.00 15.4 155.4 464 05/17/2021 01:54:14 -7 0.0 0.00 15.4 155.4 453 05/17/2021 01:55:29 -8 0.0 0.00 15.4 155.4 451 05/17/2021 01:56:44 -8 0.0 0.00 15.4 155.4 436 05/17/2021 01:57:59 -9 0.0 0.00 15.4 155.4 469 05/17/2021 01:59:14 -7 0.0 0.00 15.4 155.4 466 05/17/2021 02:00:29 -9 0.0 0.01 15.4 155.4 488 05/17/2021 02:01:44 -10 0.0 0.00 15.4 155.4 497 05/17/2021 02:02:59 -11 0.0 -0.00 15.4 155.4 492 05/17/2021 02:04:14 -12 0.0 0.00 15.4 155.4 483 05/17/2021 02:05:29 -9 0.0 0.01 15.4 155.4 491 05/17/2021 02:06:44 -9 0.0 0.00 15.4 155.4 453 05/17/2021 02:07:59 -9 0.0 0.00 15.4 155.4 459 05/17/2021 02:09:14 -10 0.0 0.00 15.4 155.4 472 05/17/2021 02:10:29 -11 0.0 0.00 15.4 155.4 449 05/17/2021 02:11:44 -6 0.0 0.00 15.4 155.4 486 05/17/2021 02:12:59 -11 0.0 0.00 15.4 155.4 483 05/17/2021 02:14:14 -10 0.0 -0.00 15.4 155.4 474 05/17/2021 02:15:29 -9 0.0 0.00 15.4 155.4 464 05/17/2021 02:16:44 -9 0.0 0.00 15.4 155.4 505 05/17/2021 02:17:59 -9 0.0 0.01 15.4 155.4 519 05/17/2021 02:19:14 -12 0.0 0.00 15.4 155.4 528 05/17/2021 02:20:29 -10 0.0 0.00 15.4 155.4 514 05/17/2021 02:21:44 -7 0.0 0.00 15.4 155.4 514 05/17/2021 02:22:59 -9 0.0 0.00 15.4 155.4 522 05/17/2021 02:24:14 -8 0.0 -0.00 15.4 155.4 524 05/17/2021 02:25:29 -8 0.0 0.00 15.4 155.4 531 05/17/2021 02:26:44 -9 0.0 0.00 15.4 155.4 537 05/17/2021 02:27:59 -9 0.0 0.00 15.4 155.4 548 05/17/2021 02:29:14 -9 0.0 0.00 15.4 155.4 556 05/17/2021 02:30:29 -11 0.0 0.01 15.4 155.4 550 05/17/2021 02:31:44 -9 0.0 0.01 15.4 155.4 559 05/17/2021 02:32:59 -9 0.0 0.00 15.4 155.4 554 05/17/2021 02:34:14 -9 0.0 -0.00 15.4 155.4 564 05/17/2021 02:35:29 -9 0.0 0.00 15.4 155.4 571 05/17/2021 02:36:44 -7 0.0 0.00 15.4 155.4 554 05/17/2021 02:37:59 -11 0.0 0.01 15.4 155.4 565 05/17/2021 02:39:14 -9 0.0 0.00 15.4 155.4 578 05/17/2021 02:40:29 -9 0.0 0.00 15.4 155.4 578 05/17/2021 02:41:44 -10 0.0 0.00 15.4 155.4 573 05/17/2021 02:42:59 -9 0.0 0.00 15.4 155.4 581 05/17/2021 02:44:14 -6 0.0 0.01 15.4 155.4 568 05/17/2021 02:45:29 -11 0.0 0.00 15.4 155.4 561 05/17/2021 02:46:44 -7 0.0 0.01 15.4 155.4 577 05/17/2021 02:47:59 -11 0.0 0.00 15.4 155.4 575 Page 10 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/17/2021 02:50:29 -8 0.0 0.00 15.4 155.4 579 05/17/2021 02:51:44 -8 0.0 0.00 15.4 155.4 594 05/17/2021 02:52:59 -10 0.0 0.01 15.4 155.4 589 05/17/2021 02:54:14 -10 0.0 0.01 15.4 155.4 586 05/17/2021 02:55:29 -8 0.0 0.00 15.4 155.4 598 05/17/2021 02:56:44 -8 0.0 0.00 15.4 155.4 598 05/17/2021 02:57:59 -8 0.0 0.01 15.4 155.4 602 05/17/2021 02:59:14 -9 0.0 0.00 15.4 155.4 608 05/17/2021 03:00:29 -8 0.0 0.01 15.4 155.4 609 05/17/2021 03:01:44 -11 0.0 -0.00 15.4 155.4 614 05/17/2021 03:02:59 -11 0.0 0.00 15.4 155.4 615 05/17/2021 03:04:14 -7 0.0 0.00 15.4 155.4 627 05/17/2021 03:05:29 -9 0.0 0.00 15.4 155.4 622 05/17/2021 03:06:44 -9 0.0 0.00 15.4 155.4 631 05/17/2021 03:07:59 -9 0.0 -0.00 15.4 155.4 623 05/17/2021 03:09:14 -9 0.0 0.00 15.4 155.4 621 05/17/2021 03:10:29 -9 0.0 0.00 15.4 155.4 623 05/17/2021 03:11:44 -10 0.0 0.00 15.4 155.4 622 05/17/2021 03:12:59 -10 0.0 0.00 15.4 155.4 619 05/17/2021 03:14:14 -9 0.0 0.00 15.4 155.4 615 05/17/2021 03:15:29 -9 0.0 0.00 15.4 155.4 626 05/17/2021 03:16:44 -9 0.0 0.00 15.4 155.4 619 05/17/2021 03:17:59 -9 0.0 -0.00 15.4 155.4 625 05/17/2021 03:19:14 -11 0.0 -0.00 15.4 155.4 613 05/17/2021 03:20:29 -7 0.0 0.00 15.4 155.4 618 05/17/2021 03:21:44 -9 0.0 0.01 15.4 155.4 623 05/17/2021 03:22:59 -9 0.0 0.01 15.4 155.4 626 05/17/2021 03:24:14 -9 0.0 0.00 15.4 155.4 625 05/17/2021 03:25:29 -8 0.0 0.00 15.4 155.4 622 05/17/2021 03:26:44 -10 0.0 0.00 15.4 155.4 629 05/17/2021 03:27:59 -7 0.0 0.00 15.4 155.4 622 05/17/2021 03:29:14 -9 0.0 0.00 15.4 155.4 635 05/17/2021 03:30:29 -9 0.0 -0.00 15.4 155.4 630 05/17/2021 03:31:44 -9 0.0 0.00 15.4 155.4 640 05/17/2021 03:32:59 -9 0.0 -0.00 15.4 155.4 634 05/17/2021 03:34:14 -7 0.0 0.00 15.4 155.4 645 05/17/2021 03:35:29 -7 0.0 0.00 15.4 155.4 649 05/17/2021 03:36:44 -8 0.0 0.00 15.4 155.4 646 05/17/2021 03:37:59 -9 0.0 0.00 15.4 155.4 650 05/17/2021 03:39:14 -5 0.0 0.00 15.4 155.4 648 05/17/2021 03:40:29 -11 0.0 0.00 15.4 155.4 655 05/17/2021 03:41:44 -10 0.0 0.01 15.4 155.4 655 05/17/2021 03:42:59 -8 0.0 0.00 15.4 155.4 659 05/17/2021 03:44:14 -7 0.0 0.00 15.4 155.4 665 05/17/2021 03:45:29 -8 0.0 0.00 15.4 155.4 652 05/17/2021 03:46:44 -10 0.0 -0.00 15.4 155.4 664 05/17/2021 03:47:59 -11 0.0 0.00 15.4 155.4 666 05/17/2021 03:49:14 -6 0.0 0.00 15.4 155.4 676 05/17/2021 03:50:29 -9 0.0 0.00 15.4 155.4 662 05/17/2021 03:51:44 -9 0.0 0.01 15.4 155.4 669 05/17/2021 03:52:59 -13 0.0 0.00 15.4 155.4 552 05/17/2021 03:54:14 -12 0.0 0.00 15.4 155.4 538 05/17/2021 03:55:29 -11 0.0 0.00 15.4 155.4 530 05/17/2021 03:56:44 -12 0.0 0.00 15.4 155.4 527 Page 11 of 12 Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number Date Time 24-hr clock Treating Pressure PSI Flow Rate B/M Density LB/G STG BBL Total BBL WHP PSI Message 05/17/2021 03:59:14 -12 0.0 -0.00 15.4 155.4 70 05/17/2021 04:00:29 -11 0.0 0.00 15.4 155.4 70 05/17/2021 04:01:44 -7 0.0 0.00 15.4 155.4 72 05/17/2021 04:02:59 -10 0.0 0.00 15.4 155.4 70 05/17/2021 04:04:14 -9 0.0 0.00 15.4 155.4 69 05/17/2021 04:05:29 -10 0.0 0.00 15.4 155.4 71 05/17/2021 04:06:44 -10 0.0 0.00 15.4 155.4 70 05/17/2021 04:07:59 -11 0.0 0.00 15.4 155.4 72 05/17/2021 04:09:14 -10 0.0 0.01 15.4 155.4 72 05/17/2021 04:10:29 -11 0.0 -0.00 15.4 155.4 72 05/17/2021 04:11:44 -7 0.0 0.00 15.4 155.4 74 05/17/2021 04:12:59 -12 0.0 0.00 15.4 155.4 70 05/17/2021 04:14:14 -9 0.0 0.00 15.4 155.4 76 05/17/2021 04:15:29 -8 0.0 0.00 15.4 155.4 76 05/17/2021 04:16:44 -9 0.0 0.00 15.4 155.4 77 05/17/2021 04:17:59 -7 0.0 0.00 15.4 155.4 78 05/17/2021 04:19:14 -9 0.0 0.00 15.4 155.4 79 05/17/2021 04:20:29 -12 0.0 0.00 15.4 155.4 80 05/17/2021 04:21:44 -9 0.0 0.00 15.4 155.4 77 05/17/2021 04:22:59 -9 0.0 0.00 15.4 155.4 79 05/17/2021 04:24:14 -12 0.0 0.00 15.4 155.4 77 05/17/2021 04:25:29 -10 0.0 0.00 15.4 155.4 78 05/17/2021 04:26:44 -11 0.0 0.00 15.4 155.4 78 05/17/2021 04:27:59 -9 0.0 0.00 15.4 155.4 79 05/17/2021 04:29:14 -9 0.0 0.00 15.4 155.4 79 05/17/2021 04:30:29 -9 0.0 0.00 15.4 155.4 78 05/17/2021 04:31:44 -8 0.0 0.00 15.4 155.4 78 05/17/2021 04:32:59 -11 0.0 0.00 15.4 155.4 78 05/17/2021 04:34:14 -9 0.0 0.00 15.4 155.4 80 05/17/2021 04:35:29 -11 0.0 0.00 15.4 155.4 77 05/17/2021 04:36:44 -10 0.0 0.00 15.4 155.4 76 05/17/2021 04:37:59 -10 0.0 0.01 15.4 155.4 79 Post Job Summary Volume of Fluid Injected, bbl N2 Maximum Rate 3.2 Average Pump Rates, bbl/min Slurry 1.0 Mud Total Slurry 155.4 Mud 0.0 Spacer 0.0 N2 Treating Pressure Summary, psi Breakdown Fluid Maximum 4324 Final -9 Average 291 Bump Plug to Breakdown Type Volume bbl Density lb/gal Avg. N2 Percent % Designed Slurry Volume 0.0 bbl Displacement 0.0 bbl Mix Water Temp degF Cement Circulated to Surface?Volume bbl Washed Thru Perfs To ft Customer or Authorized Representative Rob R Schlumberger Supervisor Circulation Lost Job Completed -- Page 12 of 12 Post Job Summary Volume of Fluid Injected, bbl N2 Maximum Rate 3.2 Average Pump Rates, bbl/min Slurry 1.0 Mud Total Slurry 155.4 Mud 0.0 Spacer 0.0 N2 Treating Pressure Summary, psi Breakdown Fluid Maximum 4324 Final -9 Average 291 Bump Plug to Breakdown Type Volume bbl Density lb/gal Avg. N2 Percent % Designed Slurry Volume 0.0 bbl Displacement 0.0 bbl Mix Water Temp degF Cement Circulated to Surface?Volume bbl Washed Thru Perfs To ft Customer or Authorized Representative Rob R Schlumberger Supervisor Circulation Lost Job Completed -- Well MT7-04 Field Alpine Job Start May/16/2021 Customer CPAI Job Number From:Herring, Keith E To:melganzoory@blm.gov; Loepp, Victoria T (OGC); Hobbs, Greg S Cc:WSC Operations Engineer; WSC Rig Advisor; Njoku, Johnson; Gorham, Brad Subject:MT7-04 (PTD 221-017) Update Date:Thursday, May 20, 2021 2:16:51 PM Attachments:image001.png Mutasim and Victoria, Current / Plan Forward: Early this morning Doyon 25 ran in the wellbore with a cleanout assembly and is currently washing and reaming down to the 7-5/8” intermediate casing shoe. From there we will log up with sonic tool to obtain TOC and POOH to evaluate results and determine path forward. It is looking like the logs could be available in the middle of the night. Can you please provide the best method to contact you for log review? Thanks, Keith Herring Drilling Engineer 907.263.4321 (Office) 907.570.2410 (Mobile) 700 G Street, ATO – 1727H Keith.E.Herring@conocophillips.com From:Hobbs, Greg S To:Elganzoory, Mutasim H; Loepp, Victoria T (OGC) Cc:WSC Operations Engineer; Njoku, Johnson; WSC Rig Advisor Subject:MT7-04 (PTD 221-017) Update Date:Wednesday, May 19, 2021 8:40:42 AM Mutasim and Victoria, The cement is just achieving 500 psi compressive strength as of 8 am this morning. Plan forward remains: Set Pack-off and test BOP. Run Cleanout assembly and sonic tool for cement log. Evaluate results and determine path forward. The log will be made available after processing and assessment by the vendor. Greg Greg Hobbs, P.E. Regulatory Engineer I Wells Team I W: (907) 263-4749 I C: (907) 231-0515 From:Loepp, Victoria T (OGC) To:WSC Operations Engineer; melganzoory@blm.gov Cc:Njoku, Johnson; WSC Rig Advisor; Gorham, Brad Subject:RE: MT7-04 Surface Pressure Integrity Test Date:Tuesday, May 4, 2021 11:29:00 AM Attachments:image001.png Thank you for forwarding the Pressure Integrity Test. Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov From: WSC Operations Engineer <wscopsengineer@conocophillips.com> Sent: Tuesday, May 4, 2021 11:08 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>; melganzoory@blm.gov Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; WSC Rig Advisor <wscrigadvisor@conocophillips.com>; Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: MT7-04 Surface Pressure Integrity Test Good morning, Please see the Pressure Integrity Test from the MT7-04 Surface Casing/Shoe attached. Please let us know if you have any questions. Thank you, Polaris – WSC Operations Engineer Sydney Deering / Scott Kolstad wscopsengineer@conocophillips.com 907.263.4544 (Office) Well Name: Rig: Date: Drilling Supervisor:Pump used:2 Strokes Barrels 2 3 4 Casing Test Pressure Integrity Test Hole Size:1 0 RKB-CHF:38.9 Ft 3387.0 Ft-MD 3058.0 Ft-TVD 3397.0 Ft-MD 3058.0 Ft-TVD Strks psi Min psi Strks psi Min psi 12.42 2 2 160 0 3602 2 82 0.00 875 4 200 1 3602 4 140 0.25 600 Mud Weight: 10.5 ppg Mud Weight:9.6 ppg 6 305 2 3601 6 222 0.50 500 Mud 10 min Gel: 17.0 Lb/100 Ft2 Mud 10 min Gel:13.0 Lb/100 Ft2 8 425 3 3600 8 310 1.00 500 Test Pressure: 3500.0 psi Rotating Weight: Lbs 10 550 4 3598 10 403 1.50 500 Rotating Weight: Lbs Blocks/Top Drive Weight:Lbs 12 670 5 3597 12 502 2.00 495 Blocks/Top Drive Weight: 32000.0 Lbs Desired PIT EMW:18.5 ppg 14 785 6 3596 14 593 2.50 495 Estimates for Test:6.7 bbls Estimates for Test:1415 psi 2.7 bbls 16 902 7 3594 16 682 3.00 495 1 1 18 1000 8 3592 18 766 3.50 495 EMW = Leak-off Pressure + Mud Weight =20 1105 9 3591 20 842 4.00 495 0.052 x TVD 0.052 x 3058 22 1212 10 3590 22 917 4.50 495 16.8 ppg 24 1325 15 3584 24 983 5.00 495 26 1440 20 3580 26 1060 5.50 495 28 1541 25 3575 28 1145 6.00 495 30 1655 30 3571 29 875 6.50 495 32 1770 30 7.00 495 34 1830 34 7.50 495 36 1950 36 8.00 495 38 2060 38 8.50 495 40 2172 40 9.00 495 42 2300 42 9.50 495 44 2410 44 10.00 495 46 2530 48 2655 50 2776 52 2890 54 3013 56 3130 58 3260 62 3600 6.2 Bbls 6.0 Bbls 2.8 Bbls 1.5 Bbls Comments:Casing test conducted with 10.5 Ksi mud system. Pressure Integrity Test conducted with 9.6 LSND. CONOCOPHILLIPS Alaska, Inc. Pumping down EMW at 3387 Ft-MD (3058 Ft-TVD) =600 9.61145+PIT 15 Second Shut-in Pressure, psi Volume Pumped Volume Bled Back Volume Input PRESSURE INTEGRITY TEST Type of Test: Casing Test Pressure IntegrityTest Hole DepthCasing Shoe Depth Casing Size and Description: Pump Rate: 5/2/2021 M Brouillet / B Book Volume/Stroke 5.00 Pumping 0.1007 MT7-04 Doyon 25 Volume Bled Back Shut-in Pumping Shut-in Volume Pumped 0 500 1000 1500 2000 2500 3000 3500 4000 0 1 2 3 4 5 6 7PRESSURE CASING TEST LEAK-OFF TEST PIT Point Barrels 0 5 10 15 20 25 30 Shut-In time, Minutes Lost 31 psi during test, held 99.1% of test pressure. MT7-04 Surface csg test FIT or LOT Pressure Integrity Test Form.xlsx Summary TATE OF ALASKA B,y�� / OIL AND GAS CONSERVATION COMMISSION Reviewed Y P.I. Supry �JV- -7/141`� DIVERTER Test Report for: GMTU MT7-04 Comm Contractor/Rig No.: Doyon 25 PTD#: 2210170 - DATE: 4/26/2021 - Inspector Jeff Jones Insp Source Operator: ConocoPhillips Alaska, Inc. Operator Rep: M. Brouillet Rig Rep: R. Fritts Inspector Well Class: DEV Inspection No: divJJ210627163214 Related Insp No: MISC. INSPECTIONS: P/F Location Gen.: P Housekeeping: P , Warning Sign P ' 24 hr Notice: P Well Sign: P Drlg. Rig. P Misc: NA GAS DETECTORS: Visual Alarm Methane: P P Hydrogen Sulfide: P ` P Gas Detectors Misc: NA NA TEST DATA MUD SYSTEM: Visual Alarm Trip Tank: P P Mud Pits: P P Flow Monitor: P _ P " Mud System Misc: NA NA ACCUMULATOR SYSTEM: — Time/Pressure P/F Systems Pressure: 2900 P Pressure After Closure: 2100 P 200 psi Recharge Time: 60 P Full Recharge Time: 131 P Nitrogen Bottles (Number of): 6 P ' Avg. Pressure: 1850 P Accumulator Misc: 0 NA DIVERTER SYSTEM: Size P/F Designed to Avoid Freeze-up? P Remote Operated Diverter? P ' No Threaded Connections? P Vent line Below Diverter? P Diverter Size: 21.25 P _ Hole Size: 16 P Vent Line(s) Size: 16 P Vent Line(s) Length: 305.7 P ' Closest Ignition Source: 81 P_ Outlet from Rig Substructure: 87 P Vent Line(s) Anchored: P. Turns Targeted / Long Radius: _ NA Divert Valve(s) Full Opening: P Valve(s) Auto & Simultaneous: Annular Closed Time: 26 P_ Knife Valve Open Time: 15 _ P Diverter Misc: 0 NA Number of Failures: 0 ✓ Test Time: 2.5 Remarks: Doyon 25 personnel performed the tests today in a safe and proficient manner with no failures witnessed. The steel vent line appeared straight, sturdy and well anchored with warning signs in place. The gas detection and pit volume totalizer alarm systems were tested and functioned properly. The rig and surrounding location appeared clean, orderly and in good condition. Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Paul McGrath ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Greater Mooses Tooth Field, Undefined Alpine Oil Pool, MT7-04 ConocoPhillips Alaska, Inc. Permit to Drill Number: 221-017 Surface Location: 986’ FSL, 194’ FWL, SESW, Sec. 32, T10N, R2E Bottomhole Location: 2618’ FSL, 13” FWL, NENW, Sec. 21, T9N, R2E Dear Mr. McGrath: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of April, 2021. Sceey, 8 D7\SHRI:RUNE3URSRVHG:HOO&ODVV ([SORUDWRU\*DV 6HUYLFH:$* 6HUYLFH'LVS F6SHFLI\LIZHOOLVSURSRVHGIRU 'ULOO /DWHUDO 6WUDWLJUDSKLF7HVW 'HYHORSPHQW2LO 6HUYLFH:LQM 6LQJOH=RQH &RDOEHG*DV *DV+\GUDWHV 5HGULOO 5HHQWU\ ([SORUDWRU\2LO 'HYHORSPHQW*DV 6HUYLFH6XSSO\ 0XOWLSOH=RQH *HRWKHUPDO 6KDOH*DV 2SHUDWRU1DPH%RQG %ODQNHW 6LQJOH:HOO :HOO1DPHDQG1XPEHU %RQG1R $GGUHVV3URSRVHG'HSWK )LHOG3RROV 0' 79' D/RFDWLRQRI:HOO*RYHUQPHQWDO6HFWLRQ3URSHUW\'HVLJQDWLRQ 6XUIDFH 7RSRI3URGXFWLYH+RUL]RQ'15$SSURYDO1XPEHU $SSUR[LPDWH6SXG'DWH )6/ ):/1:1:6715( 7RWDO'HSWK $FUHVLQ3URSHUW\ 'LVWDQFHWR1HDUHVW3URSHUW\ )6/ ):/1(1:6715( WR$$ E/RFDWLRQRI:HOO6WDWH%DVH3ODQH&RRUGLQDWHV1$'.%(OHYDWLRQDERYH06/IW 'LVWDQFHWR1HDUHVW:HOO2SHQ 6XUIDFH[\=RQH WR6DPH3RRO WR5HQGH]YRXV 'HYLDWHGZHOOV.LFNRIIGHSWK IHHW 0D[LPXP3RWHQWLDO3UHVVXUHVLQSVLJVHH$$& 0D[LPXP+ROH$QJOH GHJUHHV 'RZQKROH 6XUIDFH +ROH &DVLQJ :HLJKW *UDGH &RXSOLQJ /HQJWK 0' 79' 0' 79' + :HOGHG / 7;3 / +\G / +\G 35(6(17:(//&21',7,216800$5<7REHFRPSOHWHGIRU5HGULOODQG5H(QWU\2SHUDWLRQV -XQNPHDVXUHG 79' +\GUDXOLF)UDFWXUHSODQQHG"<HV 1R $WWDFKPHQWV3URSHUW\3ODW %236NHWFK 'ULOOLQJ3URJUDP 7LPHY'HSWK3ORW 6KDOORZ+D]DUG$QDO\VLV 'LYHUWHU6NHWFK 6HDEHG5HSRUW 'ULOOLQJ)OXLG3URJUDP $$&UHTXLUHPHQWV &RQWDFW1DPH %UDG*RUKDP 3DXO0F*UDWK &RQWDFW(PDLO%UDG*RUKDP#FRSFRP 'ULOOLQJ0DQDJHU &RQWDFW3KRQH 'DWH 3HUPLWWR'ULOO $3,1XPEHU 3HUPLW$SSURYDO 1XPEHU 'DWH &RQGLWLRQVRIDSSURYDO ,IER[LVFKHFNHGZHOOPD\QRWEHXVHGWRH[SORUHIRUWHVWRUSURGXFHFRDOEHGPHWKDQHJDVK\GUDWHVRUJDVFRQWDLQHGLQVKDOHV 6DPSOHVUHT G<HV1R 0XGORJUHT G<HV1R +6PHDVXUHV<HV1R 'LUHFWLRQDOVY\UHT G<HV1R 6SDFLQJH[FHSWLRQUHT G<HV1R ,QFOLQDWLRQRQO\VY\UHT G<HV1R 3RVWLQLWLDOLQMHFWLRQ0,7UHT G<HV1R $33529('%< $SSURYHGE\ &200,66,21(5 7+(&200,66,21 'DWH 6U3HW(QJ 6U3HW*HR 6U5HV(QJ ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEH GHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO 6XUIDFH 3HUIRUDWLRQ'HSWK79'IW */%)(OHYDWLRQDERYH06/IW &RPPLVVLRQ8VH2QO\ 6HHFRYHUOHWWHUIRURWKHU UHTXLUHPHQWV 3HUIRUDWLRQ'HSWK0'IW $XWKRUL]HG7LWOH $XWKRUL]HG6LJQDWXUH 3URGXFWLRQ /LQHU ,QWHUPHGLDWH 7XELQJZLWKSURGSDFNHUDQGSHUIMRLQWV (IIHFW'HSWK0'IW(IIHFW'HSWK79'IW &RQGXFWRU6WUXFWXUDO /HQJWK&DVLQJ &HPHQW4XDQWLW\FIRUVDFNV &HPHQW9ROXPH 0'6L]H 3OXJVPHDVXUHG LQFOXGLQJVWDJHGDWD \GV V[SSJV[SSJ &DVLQJ3URJUDP7RS6HWWLQJ'HSWK%RWWRP6SHFLILFDWLRQV 7RWDO'HSWK0'IW7RWDO'HSWK79'IW 67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 3(50,772'5,// $$& V[SSJ&ODVV* 07 *UHDWHU0RRVHV7RRWK 5HQGH]YRXV 32%R[$QFKRUDJH$ODVND &RQRFR3KLOOLSV )6/ ):/6(6:6715($$$$$$ $XWKRUL]HG1DPH V1 \SHRI: / O 5 / E 6 &ODVV RV1 V1R V1 R 'V V V ' R ZHOOLVS * 6 6 66 6 V1RV1R 6 * \( 6 V1R V )RUP5HYLVHG7KLVSHUPLWLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDOSHU$$&J By Jody Colombie at 2:22 pm, Mar 05, 2021 103-20829-00-00221-017 X X X x=289973.0 Undefined Alpine Oil Pool X X See attached Conditions of Approval for the intermediate cement job and sonic logging. y=5915807.2 X Injection cannot commence until the AOGCC issues an injection order. DLB DLB 03/10/2021 Annular preventer test to 2500 psig 1$' =RQH VTL 4/8/21 DSR-3/5/21 XBOP test pressure to 3500 psig X Surface casing LOT results to AOGCC as soon as obtained. 4/8/21 21 4/8/21 GMTU MT7-04 (PTD 221-017) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well GMTU MT7-04 with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement (and lengths) that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the e-line log does. CPAI must start the log at a depth to ensure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. &RQRFR3KLOOLSV$ODVND,QF 3RVW2IILFH%R[ $QFKRUDJH$ODVND 7HOHSKRQH 0DUFK $ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ :HVWWK$YHQXH6XLWH $QFKRUDJH$ODVND 5H $SSOLFDWLRQIRU3HUPLWWR'ULOO07 'HDU6LURU0DGDP &RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUD3HUPLWWR'ULOODQRQVKRUH$OSLQH&6DQG,QMHFWRUZHOOIURPWKH07GULOOLQJ SDG7KHLQWHQGHGVSXGGDWHIRUWKLVZHOOLV,WLVLQWHQGHGWKDW'R\RQEHXVHGWRGULOOWKHZHOO 07ZLOOXWLOL]HD´VXUIDFHKROHDQGZLOO7'DERYHWKH.VDQGDQGWKHQ´FDVLQJZLOOEHVHWDQGFHPHQWHGWR VXUIDFH7KH´LQWHUPHGLDWHKROHZLOOEHGULOOHGLQWRWKHWRSRIWKH$OSLQH&DQGODQGHGDWDQLQFOLQDWLRQRIa$´ FDVLQJVWULQJZLOOEHVHWDQGFHPHQWHGIURP7'WRVHFXUHWKHVKRHDQGFRYHU¶0'RU¶79'DERYHDQ\K\GURFDUERQ EHDULQJ]RQHV 7KHSURGXFWLRQLQWHUYDOZLOOEHFRPSULVHGRID´KRUL]RQWDOKROHWKDWZLOOEHJHRVWHHUHGLQWKH$OSLQH&VDQG7KHZHOOZLOO EHFRPSOHWHGDVDQXQVWLPXODWHG,QMHFWRUZLWK´WXELQJVWULQJZLWKSURGXFWLRQSDFNHUZLWKSUHSHUIRUDWHGSXSMRLQWVEHORZ DQGWLHGEDFNWRVXUIDFH 3OHDVHILQGDWWDFKHGWKHLQIRUPDWLRQUHTXLUHGE\$&&DDQGFIRU\RXUUHYLHZ3HUWLQHQWLQIRUPDWLRQ DWWDFKHGWRWKLVDSSOLFDWLRQLQFOXGHVWKHIROORZLQJ )RUP$33/,&$7,21)253HUPLWWR'ULOOSHU$&&D $SURSRVHGGULOOLQJSURJUDP $SURSRVHGFRPSOHWLRQGLDJUDP $GULOOLQJIOXLGVSURJUDPVXPPDU\ 3UHVVXUHLQIRUPDWLRQDVUHTXLUHGE\$&&G 'LUHFWLRQDOGULOOLQJFROOLVLRQDYRLGDQFHLQIRUPDWLRQDVUHTXLUHGE\$&&E ,QIRUPDWLRQSHUWLQHQWWRWKHDSSOLFDWLRQWKDWLVSUHVHQWO\RQILOHDWWKH$2*&& 'LDJUDPVRIWKH%23HTXLSPHQWGLYHUWHUHTXLSPHQWDQGFKRNHPDQLIROGOD\RXWDVUHTXLUHGE\$&& DDQGE $GHVFULSWLRQRIWKHGULOOLQJIOXLGVKDQGOLQJV\VWHP 'LDJUDPRIULVHUVHWXS ,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHIXUWKHULQIRUPDWLRQSOHDVHFRQWDFW%UDG*RUKDPDW %UDG*RUKDP#FRQRFRSKLOOLSVFRPRU3DXO0F*UDWKDW 6LQFHUHO\ FF 07:HOO)LOH-HQQD7D\ORU$72 'DYH/HH$72 %UDG*RUKDP3DXO0F*UDWK$72 'ULOOLQJ(QJLQHHU.DWKU\Q+RIIPHLVWHU$72 By Jody Colombie at 2:23 pm, Mar 05, 2021 SDG D3HUPLWWR'ULOODQRQVKRUH$OSLQH&6DQG,QMHFWRUZHOOIURPWKH07GULOOLQJQ S J S DQXQVWLPXODWHG,QMHFWRUZLWK´WXELQJVWULQJZLWKSURGXFWLRQSDFNHUZLWKSUHSHUIRUDWHGSXSMRLQWVEHORZS DQGWLHGEDFNWRVXUIDFH VW'R\RQE S $OSLQH&VDQGS $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 1 of 11 Printed: 3-Mar-21 MT7-04 Application for Permit to Drill Document 7DEOHRI&RQWHQWV :HOO1DPH(Requirements of 20 AAC 25.005 (f)) /RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2)) 3URSRVHG'ULOOLQJ3URJUDP 'LYHUWHUDQG%ORZRXW3UHYHQWLRQ(TXLSPHQW(Requirements of 20 AAC 25.005(c)(7)) 0$63&DOFXODWLRQV 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV(Requirements of 20 AAC 25.005 ©(5)) &DVLQJDQG&HPHQWLQJ3URJUDP 'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8)) $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9)) 6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10) 6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11)) (YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12)) 'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO (Requirements of 20 AAC 25.005 (c)(14)) 'ULOOLQJ+D]DUGV6XPPDU\ 3URSRVHG&RPSOHWLRQ6FKHPDWLF $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 2 of 11 Printed: 3-Mar-21 :HOO1DPH(Requirements of 20 AAC 25.005 (f)) 7KHZHOOIRUZKLFKWKLVDSSOLFDWLRQLVVXEPLWWHGZLOOEHGHVLJQDWHGDV07 /RFDWLRQ6XPPDU\(Requirements of 20 AAC 25.005(c)(2)) /RFDWLRQDW6XUIDFH )6/ ):/6(6:6715(80 NAD 1927 Northings: 1430128 Eastings: 5915424 RKB Elevation ¶$06/ Pad Elevation ¶$06/ 7RSRI3URGXFWLYH+RUL]RQ+HHO )6/ ):/1:1:6715(80 NAD 1927 Northings: 1426083 Eastings: 5910242 Measured Depth, RKB: ¶ Total Vertical Depth, RKB: ¶ Total Vertical Depth, SS: ¶ 7RWDO'HSWK7RH )6/ ):/1(1:6715(80 NAD 1927 Northings: 1433048 Eastings: 5895848 Measured Depth, RKB: ¶ Total Vertical Depth, RKB: ¶ Total Vertical Depth, SS: ¶ Pad Layout 289973.0 5915807.2 DLB $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 3 of 11 Printed: 3-Mar-21 :HOO6WLFN'LDJUDP 3URSRVHG'ULOOLQJ3URJUDP 7KHSURSRVHGGULOOLQJSURJUDPLVOLVWHGEHORZ3OHDVHUHIHUWR$WWDFKPHQW&RPSOHWLRQ6FKHPDWLF 0,58'R\RQRQWR07 5LJXSDQGWHVWULVHUGHZDWHUFHOODUDVQHHGHG 'ULOO´KROHWRWKHVXUIDFHFDVLQJSRLQWDVSHUWKHGLUHFWLRQDOSODQ/:'3URJUDP*5 5XQDQGFHPHQW´VXUIDFHFDVLQJWRVXUIDFH ,QVWDOO%23(DQG03'HTXLSPHQW 7HVW%23(WRSVLORZSVLKLJKKUUHJXODWRU\QRWLFH 3LFNXSDQGUXQLQKROHZLWK[´GULOOLQJ%+$WRGULOOWKHLQWHUPHGLDWHKROHVHFWLRQ &KDUWFDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV 'ULOORXW¶RIQHZKROHDQGSHUIRUP/270D[LPXP/27WRSSJ0LQLPXP/27UHTXLUHGWRGULOODKHDG LVSSJ(0: 'ULOO[´KROHWRVHFWLRQ7'XVLQJ0DQDJHG3UHVVXUH'ULOOLQJWRPDLQWDLQQHDUFRQVWDQWERWWRPKROH SUHVVXUHRQFRQQHFWLRQVLQVKDOHIRUPDWLRQ/:'3URJUDP*55(6 &KDQJHRXWXSSHUSLSHUDPVWR´VROLGERGLHVDQGWHVWVDPHWRSVL 5XQ´FDVLQJDQGFHPHQWWR¶79'DERYHWKHK\GURFDUERQEHDULQJ]RQHVFHPHQWLQJVFKHPDWLF DWWDFKHG &KDQJHXSSHUSLSHUDPVWR´[´9%5V LVSSJ(0:Provide LOT results to AOGCC as soon as available. &KDUWFDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV VTL 4/8/21 ref email 0D[LPXP/27WRSSJ0LQLPXP /27UHTXLUHGWRGULOODKHDG 2-7/8"x5-1/2" 0,58'R\RQRQWR07 7HVW%23(WRSVLORZSVLKLJK Review cement job details with AOGCC as soon as available. $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 4 of 11 Printed: 3-Mar-21 7HVW%23(WRSVLORZSVLKLJK5HJXODWRU\QRWLFH 3LFNXSDQGUXQLQKROHZLWK´GULOOLQJ%+$/RJWRSRIFHPHQWZLWKVRQLFWRROLQUHFRUGHGPRGH &KDUWFDVLQJSUHVVXUHWHVWWRSVLIRUPLQXWHV 'ULOORXWVKRHWUDFNDQGIHHWRIQHZIRUPDWLRQ3HUIRUP/27WRDPD[LPXPRISSJ0LQLPXPUHTXLUHG OHDNRIIYDOXHLVSSJ(0: 'ULOO´KROHWRVHFWLRQ7'/:'3URJUDP*55(6 3XOORXWRIKROHZLWKGULOOLQJ%+$5HYLHZFHPHQWMREGHWDLOVDQGVRQLFORJ72& 5XQ´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equirements of 20 AAC 25.005(c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age 5 of 11 Printed: 3-Mar-21 $63 )33±[' :KHUH )33 )RUPDWLRQ3RUH3UHVVXUHDWWKHQH[WFDVLQJSRLQW )33 [79' $63&$/&8/$7,216 'ULOOLQJEHORZ´FRQGXFWRU $63 >)*[±@' >[±@[ SVL 25 $63 )33±[' ±[ SVL 'ULOOLQJEHORZ´VXUIDFHFDVLQJ $63 >)*[±@' >[±@[ SVL 25 $63 )33±[' ±[ SVL 'ULOOLQJEHORZ´LQWHUPHGLDWHFDVLQJ $63 >)*[±@' >[±@[ SVL 25 $63 )33±[' ±[ SVL (B) data on potential gas zones; 7KHZHOOERUHLVQRWH[SHFWHGWRSHQHWUDWHDQ\JDV]RQHV (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; 3OHDVHVHH'ULOOLQJ+D]DUGV6XPPDU\ 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\7HVWV(Requirements of 20 AAC 25.005 ©(5)) 'ULOORXWVXUIDFHFDVLQJVKRHDQGSHUIRUP/27WHVWRU),7LQDFFRUGDQFHZLWKWKH$OSLQH/27),7 SURFHGXUHWKDW&RQRFR3KLOOLSV$ODVNDKDVRQILOHZLWKWKH&RPPLVVLRQ &DVLQJDQG&HPHQWLQJ3URJUDP &DVLQJDQG&HPHQWLQJ3URJUDP Csg/Tbg OD (in) Hole Size (in) Weight (lb/ft) Grade Conn. Cement Program +:HOGHG &HPHQWHGWRVXUIDFHZLWK\GVVOXUU\ /7;3&HPHQWWR6XUIDFH [ /+\G¶79'RU¶0'ZKLFKHYHULVJUHDWHUDERYHXSSHU PRVWSURGXFLQJ]RQH /+\G8QFHPHQWHGRSHQKROHOLQHU 3950/8519*1/.052= VTL 3/17/21 8.9 ppg EMW $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 6 of 11 Printed: 3-Mar-21 &HPHQWLQJ&DOFXODWLRQV ´6XUIDFH&DVLQJUXQWR¶0'¶79' &HPHQWIURP¶0'WR ¶RIWDLOZLWK'HHS&5(7($GG V#33*DQGIURP WRVXUIDFH ZLWKSSJ'HHS&UHWH$VVXPHH[FHVVDQQXODUYROXPHLQSHUPDIURVWDQGH[FHVVEHORZWKH SHUPDIURVW¶0']HURH[FHVVLQ´FRQGXFWRU /HDGVOXUU\IURP¶0'WRVXUIDFHZLWK$UFWLF/LWH&UHWH#SSJ 7RWDO9ROXPH IW !V[RISSJ'HHS&5(7($GG V#IWVN 7DLOVOXUU\IURP¶0'WR¶0'ZLWKSSJ'HHS&5(7($GG V 7RWDO9ROXPH IW !V[RISSJ&ODVV*$GG V#IWVN ´,QWHUPHGLDWH&DVLQJUXQWR¶0'¶79' 7RSRIVOXUU\LVGHVLJQHGWREHDW¶0'ZKLFKLV¶0'RU¶79'DERYHWKHSURJQRVLVVKDOORZHVW K\GURFDUERQEHDULQJ]RQH$OSLQH&,IDVKDOORZHUK\GURFDUERQ]RQHRISURGXFLEOHYROXPHVLVHQFRXQWHUHGZKLOH GULOOLQJDVWDJHFHPHQWMREZLOOEHSHUIRUPHGWRLVRODWHWKLV]RQH$VVXPHH[FHVVDQQXODUYROXPH 7DLOVOXUU\IURP¶0'WR¶0'ZLWKSSJ&ODVV*$GG V 7RWDO9ROXPH IW !V[RISSJ&ODVV*$GG V#IWVN 'ULOOLQJ)OXLG3URJUDPRequirements of 20 AAC 25.005(c)(8)) 6XUIDFH,QWHUPHGLDWH3URGXFWLRQ +ROH6L]HLQ[ &DVLQJ6L]HLQ 'HQVLW\33*±±± 39F3 <3OEIW )XQQHO9LVFRVLW\VTW ,QLWLDO*HOVOEIW 0LQXWH*HOVOEIW $3,)OXLG/RVVFFPLQ1&± +3+7)OXLG/RVVFFPLQQD± S+±± V[ IWVN IWVN Minimum EMW=8.6 ppg needed. 'HQVLW\33*±±± V[ 3URGXFWLRQ DLB V[RIIWVN $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 7 of 11 Printed: 3-Mar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±SSJEHIRUHSXOOLQJRXW RIWKHKROH 1RWH0DQDJHG3UHVVXUH'ULOOLQJ03'ZLOOEHXWLOL]HGIRUDGGLQJEDFNSUHVVXUHGXULQJFRQQHFWLRQVWRPLWLJDWH VKDOHLQVWDELOLW\DQGF\FOLQJ 3URGXFWLRQ+ROH 7KHKRUL]RQWDOSURGXFWLRQLQWHUYDOZLOOEHGULOOHGZLWKDZDWHUEDVHGPXGGULOOLQIOXLG)OR3URZHLJKWHGWR± SSJZLWKFDOFLXPFDUERQDWHDQG.&ODQGXWLOL]H03'IRUDGGLQJEDFNSUHVVXUHGXULQJFRQQHFWLRQV 'LDJUDPRI'R\RQ0XG6\VWHPRQILOH 'ULOOLQJIOXLGSUDFWLFHVZLOOEHLQDFFRUGDQFHZLWKDSSURSULDWHUHJXODWLRQVVWDWHGLQ$$& $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ(Requirements of 20 AAC 25.005 (c)(9)) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO 6HLVPLF$QDO\VLV(Requirements of 20 AAC 25.005 (c)(10) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO 6HDEHG&RQGLWLRQ$QDO\VLV(Requirements of 20 AAC 25.005 (c)(11)) 1$$SSOLFDWLRQLVQRWIRUDQRIIVKRUHZHOO (YLGHQFHRI%RQGLQJ(Requirements of 20 AAC 25.005 (c)(12)) (YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ 'LVFXVVLRQRI0XGDQG&XWWLQJV'LVSRVDODQG$QQXODU'LVSRVDO (Requirements of 20 AAC 25.005 (c)(14)) ,QFLGHQWDOIOXLGVGHYHORSHGIURPGULOOLQJRSHUDWLRQVRQZHOO07ZLOOEHLQMHFWHGLQWRDSHUPLWWHGDQQXOXVRQWKH 07SDGRUKDXOHGWRDQDSSURYHG&ODVVGLVSRVDOZHOORQ&' 7KH07VXUIDFHLQWHUPHGLDWHFDVLQJDQQXOXVZLOOEHIOXVKHGZLWKEEOVRIIUHVKZDWHUSULRUWRIUHH]H SURWHFWLQJZLWKGLHVHOWRa 79'7KHUHZLOOEH¶RIFHPHQWSODFHGDERYHWKHWRSRIWKH$OSLQHUHVHUYRLU DORQJZLWK¶DERYHDQ\RWKHUUHVHUYRLUWKDWLVHQFRXQWHUHGSHUUHJXODWLRQV MPD will be employed in this well. DLB 1RWH0DQDJHG3UHVVXUH'ULOOLQJ03'ZLOOEHXWLOL]HGIRUDGGLQJEDFNSUHVVXUHGXULQJFRQQHFWLRQVWRPLWLJDWHJ VKDOHLQVWDELOLW\DQGF\FOLQJ ,QFLGHQWDOIOXLGVGHYHORSHGIURPGULOOLQJRSHUDWLRQVRQZHOO 07ZLOOEHLQMHFWHGLQWRDSHUPLWWHGDQQXOXVRQWKHSJS 07SDGRUKDXOHGWRDQDSSURYHG&ODVVGLVSRVDOZHOORQ&' $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 8 of 11 Printed: 3-Mar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¶VVSHFLILHGPD[LPXPSXPSLQJSUHVVXUHRISVLIRUDQQXODU LQMHFWLRQWKHPD[LPXPSUHVVXUHDWWKHVXUIDFHFDVLQJVKRHLVHVWLPDWHGE\ 0D[6KRH3UHVVXUH SSJ 6XUI6KRH79'SVL SSJ ¶SVL SVL 3RUH3UHVVXUH SVL 7KHUHIRUH 'LIIHUHQWLDO ± SVL 7KHLQWHUQDOFDVLQJSUHVVXUHLVFRQVHUYDWLYHVLQFHIULFWLRQDOORVVHVZKLOHSXPSLQJKDYHQRWEHHQWDNHQLQWR FRQVLGHUDWLRQ7KHVXUIDFHDQGLQWHUPHGLDWHFDVLQJVWULQJVH[SRVHGWRWKHDQQXODUSXPSLQJRSHUDWLRQVKDYH VXIILFLHQWVWUHQJWKE\XVLQJWKHFROODSVHDQGEXUVWUDWLQJVOLVWHGLQWKHIROORZLQJWDEOH 2':W SSI*UDGH5DQJH&RQQHFWLRQ 7\SH&ROODSVHRI &ROODSVH%XUVWRI %XUVW ´/7;3SVLSVLSVLSVL ´/+\GSVLSVLSVLSVL $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 9 of 11 Printed: 3-Mar-21 'ULOOLQJ+D]DUGV6XPPDU\ 7REHSRVWHGLQ5LJ)ORRU'RJKRXVH3ULRUWR6SXG +ROH´&DVLQJ,QWHUYDO (YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\ &RQGXFWRU%URDFK/RZ0RQLWRUFHOODUFRQWLQXRXVO\GXULQJLQWHUYDO :HOO&ROOLVLRQ/RZ)LUVWZHOORQ3DGWUDYHOLQJF\OLQGHUGLDJUDPV *DV+\GUDWHV/RZ,IREVHUYHG±FRQWUROGULOOUHGXFHSXPSUDWHVDQG FLUFXODWLQJWLPHUHGXFHPXGWHPSHUDWXUHV &OD\%DOOLQJ0HGLXP0DLQWDLQSODQQHGPXGSDUDPHWHUVDQGIORZUDWHV ,QFUHDVHPXGZHLJKWXVHZHLJKWHGVZHHSV UHGXFHIOXLGYLVFRVLW\FRQWURO523 $EQRUPDO3UHVVXUHLQ 6XUIDFH)RUPDWLRQV /RZ'LYHUWHUGULOOVLQFUHDVHGPXGZHLJKW6KDOORZ KD]DUGVWXG\QRWHGPLQLPDOULVN /RVW&LUFXODWLRQ0HGLXP5HGXFHSXPSUDWHVPXGUKHRORJ\DGGORVW FLUFXODWLRQPDWHULDOXVHRIORZGHQVLW\FHPHQW VOXUULHVSRUWFROODUFRQWUROSLSHUXQQLQJVSHHGV [´+ROH´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´+ROH´/LQHU+RUL]RQWDO3URGXFWLRQ+ROH (YHQW5LVN/HYHO0LWLJDWLRQ6WUDWHJ\ /RVWFLUFXODWLRQ/RZ5HGXFHSXPSUDWHVUHGXFHWULSVSHHGVUHDOWLPH (&'PRQLWRULQJPXGUKHRORJ\DGGORVWFLUFXODWLRQ PDWHULDO +ROHVZDEELQJRQWULSV0HGLXP5HGXFHWULSVSHHGVFRQGLWLRQPXGSURSHUWLHV $SSOLFDWLRQIRU3HUPLWWR'ULOO07 6DYHG0DU MT7-04 APD Page 10 of 11 Printed: 3-Mar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age 11 of 11 Printed: 3-Mar-21 3URSRVHG&RPSOHWLRQ6FKHPDWLF From:Gorham, Brad To:Loepp, Victoria T (CED) Subject:FW: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Diverter Route Date:Tuesday, April 6, 2021 2:38:22 PM Victoria, Did you have any additional questions or concerns on the MT7-04 PTD? I just want to ensure I wasn’t holding up the approval process. We are about 2-3 weeks out from spud so just double checking on PTD status. Let me know when you have a chance. Thanks, Brad From: Gorham, Brad Sent: Wednesday, March 31, 2021 2:56 PM To: 'Loepp, Victoria T (CED)' <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Diverter Route Victoria, The first structure that the diverter would encounter, as you travel South from the rig, is a group of pits that the diverter will run adjace to. The next structure is to be a truck loading and unloading area. This truck loading structure is not present and construction will not commence until later in the summer. The MT7G and MT7E buildings will be in place during the time of diverter use. We will be running the diverter under the stairs of MT7G and adjacent to MT7E. Both the MT7G and MT7E will be decommissioned while we are drilling on diverter to ensure there are no ignition sources. The only other ignition source along the diverter route would be the rig itself. Please let me know if that didn’t answer your question. Thanks, Brad From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Wednesday, March 31, 2021 9:49 AM To: Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Diverter Route Brad, Thank you for the information. Could you please identify the buildings that will be in place at the time of drilling and the ignition sources along the route of the diverter? Thank you, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov From: Gorham, Brad <Brad.Gorham@conocophillips.com> Sent: Tuesday, March 30, 2021 2:24 PM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Subject: FW: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Victoria, Apologies for the delayed response as we had to ensure the diverter configuration was accurate. Please see attached for the planned diverter configuration and diverter schematic for Doyon 25. It is important to note that the structures that the diverter are “traveling” through are either not built yet or will be locked out and tagged out while the rig is on diverter. We have included the 75’ radius circle to highlight the area that cannot have any active ignition sources while we are drilling on diverter. I have also included the kick tolerance calculations as previously requested. Lastly, there have been a couple minor changes to our planned operations since we originally submitted the PTD. I have included an updated operations summary and outlined them below. Surface mud weights: Originally proposed 9.0 – 10.0 ppg range : New range: 9.0-10.7 ppg This change is purely due to us wanting to mitigate potential instability issues in the Seabee formation We will be running 2-7/8” x 5-1/2” VBR’s as opposed to the previously listed 3-1/2” x 6” VBR’s on the initial BOPE rig up Please let me know if there is any additional information you need or if you have any questions. Thanks, Brad From: Hobbs, Greg S Sent: Thursday, March 18, 2021 12:05 PM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]GMTU MT7-04 (PTD 221-017) Victoria, Apologies, I should have been clearer. The diverter routing diagram is the hold-up on our end. We are working with the projects group to make it. Brad completed the kick tolerance with earlier well planning, and I have put my hands on the D-25 BOP schematic and Diverter Schematic for Doyon 19, which I am confirming is the same for 25. We just wanted to send it as one package next week given the diverter routing diagram timing. Thank-you for having the permit ready, and sorry it is taking some time on our end to gather the final information. Greg From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Thursday, March 18, 2021 9:31 AM To: Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: [EXTERNAL]GMTU MT7-04 (PTD 221-017) “not an issue”? What does that mean? I had hoped to get the approved PTD out today. However, that is fine to gather/deliver next week. From: Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Sent: Thursday, March 18, 2021 8:43 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]Fwd: GMTU MT7-04 (PTD 221-017) Hi Victoria, Dave Lee responded that the data is not an issue, he requested that Brad could gather and deliver next week with the pressure off on this permit due to the continuance of CD5-31. Greg From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Thursday, March 18, 2021 7:34 AM To: Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: [EXTERNAL]Fwd: GMTU MT7-04 (PTD 221-017) CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Sent from my iPhone Begin forwarded message: From: "Loepp, Victoria T (CED)" <victoria.loepp@alaska.gov> Date: March 17, 2021 at 3:42:00 PM AKDT To: "Gorham, Brad" <Brad.Gorham@conocophillips.com> Subject: GMTU MT7-04 (PTD 221-017) Brad, Please provide diverter and BOP stack schematic. Also provide diverter route diagram with 50’ radius circle marked at the diverter discharge. Please provide kick tolerance calculations for drilling out of the SC shoe. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov ƚƚĂĐŚŵĞŶƚϭʹƌĞĂŽĨZĞǀŝĞǁ;KZͿ ŶƌĞĂŽĨZĞǀŝĞǁƉůŽƚŝƐƐŚŽǁďĞůŽǁŽĨƚŚĞDdϳͲϬϰƉůĂŶŶĞĚǁĞůůƉĂƚŚĂŶĚŽĨĨƐĞƚǁĞůůƐ͘ƵĞƚŽƚŚĞĨĂĐƚ ƚŚĂƚDdϳͲϬϰŝƐƚŚĞĨŝƌƐƚǁĞůůŽŶƚŚĞDdϳƉĂĚ͕ƚŚĞƌĞĂƌĞŶŽŽƚŚĞƌŽĨĨƐĞƚƐǁŝƚŚŝŶƚŚĞЬŵŝůĞƌĞǀŝĞǁ͘ tĞůů EĂŵĞ^ƚĂƚƵƐ dŽƉŽĨ ůƉŝŶĞ WŽŽů ;DͬdsͿ dK ;DͬdsͿ dKʹ ĞƚĞƌŵŝŶĞĚ LJ ZĞƐĞƌǀŽŝƌ ^ƚĂƚƵƐ ŽŶĂů /ƐŽůĂƚŝŽŶ ĞŵĞŶƚ KƉĞƌĂƚŝŽŶƐ ^ƵŵŵĂƌLJ EͬEͬEͬEͬEͬEͬEͬEͬ 07ZS3ODQ6XPPDU\ 'RJOHJ6HYHULW\ 0HDVXUHG'HSWK 6XUI&VJ ,QW&VJ $]LPXWKIURP1RUWK>@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@ 07ZS 07ZS 07ZS 07ZS 07ZSSHUPLW 07ZS 07ZS 07ZS 7UXH9HUWLFDO'HSWK 9HUWLFDO6HFWLRQDW 6XUI&VJ ,QW&VJ &HQWUHWR&HQWUH6HSDUDWLRQ 0HDVXUHG'HSWK (TXLYDOHQW0DJQHWLF'LVWDQFH '', 6859(< 352*5$0 'DWH79DOLGDWHG<HV9HUVLRQ 'HSWK)URP 'HSWK 7R 6XUYH\3ODQ 7RRO 07ZS*076: *<'*&66 07ZS*076: 0:',)56$*06 07ZS*076: 0:',1&B21/< ,1&! 07ZS*076: 0:',)56$*06 07ZS*076: 0:',1&B21/< ,1&! 07ZS*076: 0:',)56$*06 6XUIDFH/RFDWLRQ 1RUWK (DVW *URXQG &$6,1* '(7$,/6 79' 0' 1DPH 6XUI&VJ ,QW&VJ 0DJ0RGHO 'DWH %**0 0DU 0DJQHWLF1RUWKLV(DVWRI7UXH1RUWK0DJQHWLF'HFOLQDWLR 0DJ'LS )LHOG6WUHQJWK Q7 6(&7,21 '(7$,/6 6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ 6WDUW%XLOG 6WDUW%XLOG 6WDUW'/67)2 6WDUWKROGDW0' 6WDUW'/67)2 6WDUWKROGDW0' 6WDUWKROGDW0' 6WDUW'/67)2 6WDUWKROGDW0' 077' 7'DW )250$7,21723'(7$,/6 79'3DWK)RUPDWLRQ %DVH3HUPDIURVW & & & . $OELDQ $OELDQ $OELDQ $OELDQ $OELDQ $OELDQ +5= /&8 $OSLQH& 7RS3URGXFLQJ,QWHUYDO %\VLJQLQJWKLV,DFNQRZOHGJHWKDW,KDYHEHHQLQIRUPHGRIDOOULVNVFKHFNHGWKDWWKHGDWDLVFRUUHFWHQVXUHGLW VFRPSOHWHQHVVDQGDOOVXUURXQGLQJ ZHOOVDUHDVVLJQHGWRWKHSURSHUSRVLWLRQDQG,DSSURYHWKHVFDQDQGFROOLVLRQDYRLGDQFHSODQDVVHWRXWLQWKHDXGLWSDFN,DSSURYHLWDVWKHEDVLLV IRUWKHILQDOZHOOSODQDQGZHOOVLWHGUDZLQJV,DOVRDFNQRZOHGJHWKDWXQOHVVQRWLILHGRWKHUZLVHDOOWDUJHWVKDYHDIHHWODWHUDOWROHUDQFH3UHSDUHGE\&KHFNHGE\$FFHSWHGE\$SSURYHGE\ 5.%#XVIW 7UXH9HUWLFDO'HSWKXVIWLQ 9HUWLFDO6HFWLRQDWXVIWLQ6XUI&VJ,QW&VJ07*076:07ZS6HFWLRQ9LHZ3URMHFW :HVWHUQ1RUWK6ORSH6LWH*075HQGH]YRXV3DG:HOO 07*076::HOOERUH *076:'HVLJQ 07ZS 3ODQ9LHZ3URMHFW :HVWHUQ1RUWK6ORSH6LWH*075HQGH]YRXV3DG:HOO 07*076::HOOERUH *076:'HVLJQ 07ZS6RXWK1RUWKXVIWLQ :HVW(DVWXVIWLQ6XUI&VJ,QW&VJ07*076:07ZS 1. Proposed Drilling Program The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 25 onto MT7-04 2. Rig up and test riser, dewater cellar as needed. 3. Drill 16” hole to the surface casing point as per the directional plan (LWD Program: GR). 4. Run and cement 13.375” surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low / 3500 psi high (24-48 hr regulatory notice). 7. Pick up and run in hole with 9-7/8 x 11” drilling BHA to drill the intermediate hole section. 8. Chart casing pressure test to 3000 psi for 30 minutes. 9. Drill out 20’ of new hole and perform LOT. Maximum LOT to 18.5 ppg. Minimum LOT required to drill ahead is 12.5 ppg EMW. 10. Drill 9-7/8 x 11” hole to section TD, using Managed Pressure Drilling to maintain near constant bottom hole pressure on connections in shale formation (LWD Program: GR/RES). 11. Change out upper pipe rams to 7.625” solid bodies and test same to 3,500 psi. 12. Run 7.625” casing and cement to 250’ TVD above the hydrocarbon bearing zones (cementing schematic attached). 13. Change upper pipe rams to 3-1/2” x 6” 2-7/8”x 5-1/2” VBRs. 14. Test BOPE to 250 psi low / 3,500 psi high (24-48 Regulatory notice). 15. Pick up and run in hole with 6.5” drilling BHA. Log top of cement with sonic tool in recorded mode. 16. Chart casing pressure test to 3500 psi for 30 minutes. 17. Drill out shoe track and 20 feet of new formation. Perform LOT to a maximum of 16.0 ppg. Minimum required leak-off value is 11.0 ppg EMW. 18. Drill 6.5” hole to section TD (LWD Program: GR/RES). 19. Pull out of hole with drilling BHA. Review cement job details and sonic log TOC. 20. Run 4.5” tubing/liner combo with shoe, pre-perforated joints, production packer, landing nipple, BHI Hydrotrip ball seat, gas lift mandrel(s), and downhole gauge. Displace mud in production casing to kill weight brine, space out and land tubing hanger with pre-installed and pre-tested BPV. 21. Pressure test seals to 5,000 psi. Nipple down BOP 22. Install tubing head adapter assembly. Pressure test adapter assembly to 5,000 psi. Remove BPV. 23. Freeze Protect by bullheading down IA. 24. Drop BHI Hydrotrip ball and pump down tubing until ball seats. 25. Pressure up to 3,500 psi to set production packer. Test tubing to 3,500 psi / 30 minutes and chart test. Test casing annulus separately to 3,500 psi / 30 minutes and chart test. 26. Increase pressure to shift BHI Hydrotrip allowing ball to fall down tubing to shoe to dissolve. 27. Bullhead freeze protect down tubing. 28. Secure well. Rig down and move out. Surface KT_BG 4/7/2021 12:40 PM Well: MT7-04 <== Data Input Name: Brad Gorham <== Data Input Mud Weight (ppg) 10.00 <== Data Input Weak point or LOT - Measured depth (ft) 3,444'<== Data Input Weak point or LOT True vertical depth (ft) 3,901'<== Data Input Weak point or LOT - Hole angle (deg) 0.0º<== Data Input Weak point or LOT - Hole size (in) 11.000"<== Data Input Weak point pressure or LOT - EMW (ppg) 12.00 <== Data Input Zone of interest - Measured depth (ft) 12,115'<== Data Input Zone of interest - True vertical depth (ft) 8,399'<== Data Input Zone of interest - Hole angle (deg) 85.0º<== Data Input Zone of interest - Hole size (in) 11.000"<== Data Input Zone of interest - Pore pressure EMW (ppg) 9.20 <== Data Input Gas gradient (psi/ft) 0.10 <== Data Input Bottom hole assembly OD (in) 6.750"<== Data Input Bottom hole assembly length (ft) 300'<== Data Input Drill pipe OD (in) 5.000"<== Data Input BHA annular vol. @ zone of interest (bbl/ft)0.0733 DP annular vol. @ zone of interest (bbl/ft)0.0933 DP annular vol. @ weak point (bbl/ft)0.0933 Additional safety margin (psi) 0.00 <== Data Input Weak point pressure (psi):Plo 2,434 psi Weak point pressure - Safety margin:Pmax 2,434 psi Pmax EMW 12.00 ppg Max anticipated formation pressure (psi):Pf 4,018 psi Weak Pt to Zone of Interest distance (TVD ft):OH {TVD}4,498' Weak Pt to Zone of Interest distance (MD ft):OH {MD}8,671' Maximum influx height at the bit (TVD ft):H {TVD}1,798' Maximum influx height at the bit (MD ft):H {MD}20,628' Calc. volume of {H} around BHA:V1bha 22.0 bbl Calc. volume of {H} around drill pipe:V1dp 1895.7 bbl Calc. volume that H equals @ initial shut in:V1 1917.7 bbl Calc. vol. that H equals @ weak point (MD ft):Vwp 167.7 bbl Calc. volume of Vwp @ initial shut in:V2 101.6 bbl Kick Tolerance: V2 101.6 bbl NOTE: Spreadsheet revised by: G. S. Walz 3/9/99 Well: MT7-04 <== Data Input Name: Brad Gorham <== Data Input Mud Weight (ppg) 9.20 <== Data Input Weak point or LOT - Measured depth (ft) 12,115'<== Data Input Weak point or LOT True vertical depth (ft) 8,399'<== Data Input Weak point or LOT - Hole angle (deg) 85.0º<== Data Input Weak point or LOT - Hole size (in) 11.000"<== Data Input Weak point pressure or LOT - EMW (ppg) 11.50 <== Data Input Zone of interest - Measured depth (ft) 26,112'<== Data Input Zone of interest - True vertical depth (ft) 8,515'<== Data Input Zone of interest - Hole angle (deg) 85.0º<== Data Input Zone of interest - Hole size (in) 6.500"<== Data Input Zone of interest - Pore pressure EMW (ppg) 9.20 <== Data Input Gas gradient (psi/ft) 0.10 <== Data Input Bottom hole assembly OD (in) 6.500"<== Data Input Bottom hole assembly length (ft) 300'<== Data Input Drill pipe OD (in) 4.000"<== Data Input BHA annular vol. @ zone of interest (bbl/ft)0.0000 DP annular vol. @ zone of interest (bbl/ft)0.0255 DP annular vol. @ weak point (bbl/ft)0.1020 Additional safety margin (psi) 0.00 <== Data Input Weak point pressure (psi):Plo 5,023 psi Weak point pressure - Safety margin:Pmax 5,023 psi Pmax EMW 11.50 ppg Max anticipated formation pressure (psi):Pf 4,074 psi Weak Pt to Zone of Interest distance (TVD ft):OH {TVD}116' Weak Pt to Zone of Interest distance (MD ft):OH {MD}13,997' Maximum influx height at the bit (TVD ft):H {TVD}2,655' Maximum influx height at the bit (MD ft):H {MD}30,459' Calc. volume of {H} around BHA:V1bha N/A Calc. volume of {H} around drill pipe:V1dp N/A Calc. volume that H equals @ initial shut in:V1 N/A Calc. vol. that H equals @ weak point (MD ft):Vwp N/A Calc. volume of Vwp @ initial shut in:V2 N/A Kick Tolerance: N/A See Note NOTE: Maximum influx height (H) extends past the weak pt. Spreadsheet revised by: G. S. Walz 3/9/99 From:Gorham, Brad To:Boyer, David L (CED) Subject:RE: [EXTERNAL]Digital Survey File for MT7-04 Date:Tuesday, March 9, 2021 3:29:15 PM Dave, No we are not going to pre-produce MT7-04 and you are correct that since this is the first well at GMT2, there are no other wells within ¼ mile. Let me know if you have any additional questions. Thanks, Brad From: Boyer, David L (CED) <david.boyer2@alaska.gov> Sent: Tuesday, March 9, 2021 2:43 PM To: Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: RE: [EXTERNAL]Digital Survey File for MT7-04 Hi Brad, Since MT7-04 well is a WAG injector, will it be pre-produced and if so, for how long? Since it appears to be the first development well in the grid, it looks like there are no other producing wells within ¼ mile of MT7-04. Thanks, Dave B. From: Gorham, Brad <Brad.Gorham@conocophillips.com> Sent: Monday, March 8, 2021 11:13 AM To: Boyer, David L (CED) <david.boyer2@alaska.gov> Subject: RE: [EXTERNAL]Digital Survey File for MT7-04 Dave, Please see attached. Let me know if this works for you or if you need anything else. Thanks, Brad From: Boyer, David L (CED) <david.boyer2@alaska.gov> Sent: Friday, March 5, 2021 4:57 PM To: Gorham, Brad <Brad.Gorham@conocophillips.com> Subject: [EXTERNAL]Digital Survey File for MT7-04 CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Brad, I just began reviewing the 401 for MT7-04 well. Could you please e-mail over a digital copy of the preliminary survey in either ASCII or Excel format? This makes it faster to plot the well path in our Geographix database. Thank you, Dave Boyer AOGCC Revised 2/2015 TRANSMITTAL LETTER CHECKLIST WELL NAME: ______________________________________ PTD: _____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD: ____________________________ POOL: ______________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit No. _____________, API No. 50-_______________________. Production should continue to be reported as a function of the original API number stated above. Pilot Hole In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (_______________________PH) and API number (50-_____________________) from records, data and logs acquired for well (name on permit). Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (_____________________________) as Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for well ( ) until after ( ) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (________________________) must contact the AOGCC to obtain advance approval of such water well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (_______________________________) in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. MT7-04 221-017 X X X Greater Mooses Tooth 2 Undefined Alpine Oil Pool WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:GMTU MT 7-04Initial Class/TypeSER / PENDGeoArea890Unit10750On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2210170COLVILLE RIVER, UNDEFINED OIL - 120185NA1Permit fee attachedYes2Lease number appropriateYes3Unique well name and numberNoPool application in review by AOGCC.4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYesDirectional plan view is included.8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNoAIO application in review by AOGCC.14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For YesNo wells within 1/4 mile of MT7-04.15All wells within 1/4 mile area of review identified (For service well only)NoNo pre-production.16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes80' conductor driven18Conductor string providedYesSurface casing set to 3444' MD19Surface casing protects all known USDWsYes224% excess cement planned20CMT vol adequate to circulate on conductor & surf csgNo21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented perf joints22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedYesdiverter discharge route and diverter meet regulation27If diverter required, does it meet regulationsYesMax reservoir pressure is 3765 psig(8.9 ppg EMW);will drill w/ 8.8-11.2 ppg EMW28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 1891 psig; will test BOPs to 3500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownNo33Is presence of H2S gas probableYesNo wells within 1/4 mile radius34Mechanical condition of wells within AOR verified (For service well only)Yes35Permit can be issued w/o hydrogen sulfide measuresYes36Data presented on potential overpressure zonesNA37Seismic analysis of shallow gas zonesNA38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprDLBDate3/9/2021ApprVTLDate4/8/2021ApprDLBDate3/8/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDateJMP 4/8/21dts 4/8/2021JLC 4/8/2021