Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout192-114XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
/ ¢2"///¢ File Number of Well History File
PAGES TO DELETE Complete
RESCAN
Color items - Pages:
GrayScale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
-[] ' Logs-of vadous kinds .
[] Other
COMMENTS'
Scanned by: ~
Dianna Vincent Nathan Lowell
Date:
[] TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: ~si
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
NOVEMBER 13, 2000
P
M
.1~
A T
TH
E
E
E W
'E R IA L UNDER
IS M A R K.E R
Memorandum
State of Alaska
Oil and Gas Conservation Commission
Cancelled or Expired Permit Action
EXAMPLE: Point Mclntyre P2-36AXX API# 029-22801-95
Re:
This memo will remain at the from of the subject well file.
Our adopted conventions for assigning APl numbers, permit numbers and well names did not
specifically address expired or cancelled permits. This omission has caused some inconsistencies in
the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt
formal procedures for this class of permit application in order to prevent future database disparities.
If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain
unchanged. The AP! number and in some instances the well name reflect the number of preexisting
reddils and or muitilaterais in a well. In order to prevent confusing a cancelled or expired permit with
an active well or multilateral these case sensitive well identifiers will be changed for expired and
cancelled applications for permits to ddil.
The AP! number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95.
The well name for a cancelled or expired permit is modified with an appended xx.
These procedures are an addendum to the AP! numbering methods described in AOGCC staff
memorandum "Multi-lateral (weilbore segment) Drilling Permit Procedures, revised December 29,
1995.
AOGCC database has been changed to reflect these changes to this permit.
Statistical Technician
ALASKA OIL AND GAS
CONSERVATION COMMISSION
October 30, 1992
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
Michael Zanghi
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Point McIntyre P2-25
ARCO Alaska, Inc.
Permit No: 92-114
Sur. Loc. 122'SNL, 1411'EWL, Sec. 14, T12N, R14E, UM
Btmhole Loc. 1878'SNL, 1325'EWL, Sec. 7, T12N, R15E, UM
Dear Mr. Zanghi:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE
test performed before drilling below the surface casing shoe must be
given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field
inspector on the North Slope pager at 659-3607.
Sincerely,
Russell A. Douglass
Commissioner
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~C~ pti.lied on recycled paper
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25. OO5
la. Type of work Drill [] Redrill FIIl b. Type of well. Exploratory r-I Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenFlI Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE = 49'feet Point Mclntyre
3. Address 6. Property Designation
p, O. Box 196612. Anchorage. Alaska 99519-6612 ADL 365548
4. Location of well at surface 7. Unit or property Name 11. Type Bond(s~e 20 AAC 25.025)
122'SNL, 1411'EWL, SEC. 14, T12N, R14E, UM Point Mclntyre
At top of productive interval 8. Well number Number
1944'SNL, 1129'EWL, SEC. 7, T12N, R15E, UM P2-25 U-630610
At total depth !9. Approximate spud date Amount
1878' SNL, 1325' EWL, SEC. 7, T12N, R15E, UM 11/1/92 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (Ma and TVD)
, property line
! ADL 34627- 3400 feet P2-49-66'@ 2300' MD feet 2560 15497' MD/9444' TVDfeet
16. To be completed for deviated wells 17. Anticipated pressure (s,~ 2o AAC 25.o35 (e)(2))
Kickoff depth 5oofeet Maximum hole angle 59 o Maximum sudace 3330psi• At total depth (TVD)
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole -Casing Weight Grade Coupling Length MD TVD MD TVD '(include'stage data)
30" 20" 91.5# H-40 Weld 78' 37' 37' 115' 115' 245 cu ft Coldset fl
16" 13-3/8" .68# L-80 B TC 4712' 36' 36' 4745 4000' 3596 cuft AS 111/464 cu ft "G"
12-1/4" 9-5/8" 47# L-80 NSCC 15097' 35' 35' 15130' 9126' 644 cu ft Class "G"
8-1/2" 7" 26# 13CR Fox 513' 14980' 8996' 15497' 9444' 186 cu ft Class "G"
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor ~i~,~ , .... V ~D
Surface
Intermediate
Production ;-.~,"r' ,",., {-)
-' Liner -~,~[,2 (')jj ° ..... -- ·
Perforation depth' measured :'~'~'~ ''-!' o~ u;,~, L;c.i!.S,.
true vertical .........
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report• 20 AAC 25.050 requirements•
21. I hereby certify3txat the foregoing is true and correct to the best of my knowledge
Signed ~7~,~_ u/~ F)' )¢/'0 ' ~. o~ ~,~ ~.',O.,ommissionTitleuseDri//ingEngineerSuperviSOronly Date
Permit Number IAPI number IApproval date See cover letter
~'2. ~//' ¢/' ]5 O- 0 ~ '~- 2_ zz_ ~':~" I / ~ --~:7,¢~ ---¢~ for other requirements
Conditions of approval Samples req.uir_ed [] Yes _,~NO Mud Icg required I-IYes/~ No
Hydrogen sulfide measures [] Yes ~ No Directional survey required /'l~-Yes [] No
Required working pressure for BOPE 1-12M; D3M; ~hM; F'IIOM; 1-115M;
Other:
ORICtNAL SIGNED BY by order of
Approved by RUSSELL A. OOUGLA$$ Commissioner me commission Date./~)
Form 10-401 Rev. 12-1-85 Submit in triplicate
WELL PLAN SUMMARY
WELL NAME: PZ-z5
AFE NUMBER: 2C001 6
SURFACE LOCATION:
1 22' FNL & 1411' FWL, SEC 14 T1ZN R14E UM
TARGET LOCATION:
1944' FNL & 1129' FWL, SEC 7 T1ZN R1 SE UM
BOTTOM HOLE LOCATION: 1878' FNL & 1325' FWL, SEC 7 T12N R1SE UM
TOTAL DEPTH:
1 5497 MD/9444 TVD
ESTIMATED SPUD DATE: 11/1/92
CONTRACTOR: AUDI 2
ELEVATIONS:
PAD: 1 2'
Pad TO RKB: 37'
RKB: 49'
DIRECTIONAL INFORMATION:
KOP: 500
BUILD RATE: 2°/100'
EOB: 2957/3452
AVG ANGLE: 59°20'
BOD:
DROP RATE:
EOD:
FINAL ANGLE:
7976/13212
2°/100'
9001/14665
30°
DIRECTION:
DEPARTURE
at TD:
N71 °24'E
11048
FORMATIONS SS Depth
Permafrost 1737
K-15 5160
West Sak 6985
K-10 9066
K-5 NP
HRZ NP
Kalubik" 9066
Kuparuk 9077
Miluveach 9308
CASING PROGRAM
1. Surface casing point @ 4000' TVD to cover build.
Z.
,
Intermediate casing point picked by geologist on location and approved by ddlling supervisor. In
this well the casing point is projected to be within the Kalubik formation.
TD picked as 100' md below top of Miluveach.
Bit Size
30"
16"
12 1/4"
8 1/2"
Casing Size Weight .Grade Connection Top Bottom Length
20" 91.5# H-40 WELD 37 11 5 78
13 3/8" 68# L-80 BTC 36 4745 4709
9 5/8" 47# L-80 NSCC 35 15130 1 5095
7" 2_6# Cr-13 Fox 14980 15497 513
,
,
,
,
.
.
,
.
,
10.
11.
P2-25
.Operations Summary
MIRU AUDi 2 drilling rig.
Spud well and drill 16" hole to 4000' tvd.
Set 13 3/8" casing and cement same. Test casing to 2500 psi for 30 minutes. Nipple up
BOPs and test same to 5000 psi.
Pick up 12 1/4" BHA and drill 10' of new hole and perform leakoff test. Continue
drilling to 15130' md / 9126' tvd.
Set 9 5/8" casing and cement same.
PU 8 1/2" BHA and test casing to 3000 psi. Drill 10' of new hole and perform
formation integrity test to12.5 ppg EMW. Displace well to mineral oil core fluid. Drill
to top of sand.
Core to 50' below WOC at 9118' tvd, and drill 8 1/2" hole to a total depth of 15,497' md /
9444' tvd. Run open hole logs.
Set 7" liner and cement same. Clean out 9 5/8" casing.
PU 6" BHA and clean out 7" liner; test to 3000 psi for 30 minutes.
Circulate well to 9.8 ppg inhibited brine with oxygen scavenger. Recover core fluid.
Run cased hole logs. Freeze protect well with 600' of diesel. NU dry hole tree and test to
3000 psi. Release rig.
Run tubing string at later date with workover rig.
Prudhoe Bay Drillin
Poin[ McInLyre
Well' P2-25
VERTIGAL VI£W
SCALE 500 -F't:, / ]3IVISIBN
REFERENCE: WELL HEAD
1000--1
1
20002
2500~
2546
3000--
3500--
3881--.
4000
4500---
5000--
5209
5500--
6000--
6500--
7000~
7034
7500--
8000
8013
8500--
9000--
9186
I 1
I 000 500 0
0.00' 8 0 MD R,K.B. ELEVATION (49,0' ABOVE SEA LEVEL)
0,00' 8 600 MD KOP BUILD 1.0/100'
2.00' 8 800 MD
4.00' ~ 1000 MD
6.00' ~ 1200 MD
8.00' 8 1400 MD :
~ 10,00' 8 1600 MD KOP BUILD 1.5/100'
~ 13.00' e 1800 MD '
\ 16.00' 8 2000 MD
~ 19,00' ~ 2200 MD
\ 22.00' e 2400 MD
~ 25,00' @ 2600 MD KOP BUILD 2,0/100'
~7\187 ~k, 31.00' e 2900 MD '
qN 37.00' ~ 3200 MD
x,x 43.00' ~ 3500 MD
~ 49.00' ~ 3800 MD .
.... ~-~ 55.00' 8 4100 HD
~o~v ~ 62.70' ~ 4485 MD END OF BUILD
1900
~HL:
See... "'7 'T-IZN
(Z~ 15H97' mD / c~444'-m,,o
,.
MD 13 3/8 CSG. PT.
4243
BHL
TVD 9443,60
MD 15496,79
VS 11026,59
North 3515,86
,~ 6~.70' 87381~DK- 15 . Eas~ 10451.05
~~~361 MD W. SAK.-- .......
~ 62.70' 8 13495 MD START OF DROP
9676 ~ 54.70' 8 13895 MD
xx 48.70. e 14195 MD
~ 36.70' 8 14795 MD
~ 30.00' @ 15397 MD NILUVEACH
7780
11027
30.00' 8 15497 MD TOTAL DEPTH
500 10001500200025003000350040004500500055006000650070007500800085009000950010000 11000 12000
VERTICAL SECT ION PLANE: 71,41 °
Prudhoe Ba~ Drillin~
?oint McIntyre
Well' P2-25
( IS iITHI .... I00
HE]RIZBNTAL
SCALE 4 O0
REFERENCE:
VIEW (TRUE NBA TH)
Ft, / DIVISIBN
WELL taEA]]
4800
-- BHL
-- TVI~ 944S.'gO ~
: MD t5496,79
-- VS 11086.59 :
North 3515,86 ~ ~ ~
-- East 10451.05 ~ $
~ ·
~ ~ , ¢· ~ ·
~ ~ o . ~
2 -
.
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
441
4000--
3601
3200--
2800--
2400--
'2000--
1600"--"
1200'"--
B00--
400--
'" ",?';ii' 80
-:~'" ,1200'"-- ·
1600 1200 800 400 0 400 800 1200 1600200024002800380036004000 440048005200560060006400680072007600800084008800920096001000(10400 11200 12000
General Purpose Worksheet
ilSubject
IPage No. Of
By IDate
AR3B-6287
d"
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
O L'II'"/~ 5' mi:)/ urOV....~' TVD
13//oZ,:t / rno
7 '/ 2(,=,~ 13 C~ ~bo Fox
ct/q.u,ur '-'rvO
MUD PROGRAM - P2-25
SPUD MUD PROPERTIES
0'-4000' TVD
Density Marsh Vis Yield Pt. 10 sec gel
Spud 8.7 300 40-60 30-60
Mud 9.5 100 20-40 15-20
10 min gel
60-80
20-30
9-10
9-10
APl F.L.
15-25
15-25
Hardness
<200
<200
INTERMEDIATE HOLE MUD PROPERTIES:
4000' TVD - 9126' TVD
Lightly Dispersed FW Polymer Mud
Mud Weight Yield Point 10 sec Gel 10 min Gel
9.5 - 10.2 10 - 20 5 - 10 10 - 20
PRODUCTION HOLE/ CORING FLUID PROPERTIES
9126' TVD - 9444' TVD
Versacore LVT-200 Mineral Oil Mud
APl Fluid Loss
30 - 6.0
9.5 - 10.0
Hardness
< 200
Weight PV YP 10 sec Gel
9.8-10.2 15-20 7-12 5-9
10 min Gel
15-20
HTHP F.L.
<2cc
i,S,
2000
Pt. Mc Intyre P2-25 Casing Design Specifications
SURFACE CASING
13-3/8" 68#/FT K-55 & L-80 BTC CASING
BURST COLLAPSE
K-55 3450 1950
L-80 5020 2260
PBYS (#) TJYS (#) DEPTHS
1069000 1300000 (0'-80' TVD)
1556000 1585000 (80'-4000' TVD)
Burst Pressure Calculation
Burst rating based on shutting in the well on a gas kick equivalent to the
LOT (14.0 ppg) at the surface casing shoe. Worst case will be in the K-55
casing, which has no back up gradient.
LOT (ppg) TVD (FT) SIPRESSURE
14 4000 2912
Burst S.F. 1.1 8
Collapse Calculation
Collapse rating based on losing returns until the fluid level is below the surface casing shoe
Mud weight behind the surface casing is 9.5 ppg
Mud Wt. (ppg) TVD (FT) Collapse press
9.5 4000 1976
Collapse S.F. 1.1 4
Tension Calculation
Based on full string weight in mud
Casg Wt. (#/ft) MD (FT)
68 4745
PBYS
Tension S.F. 3.88
Mud Wt.
9.5 ppg
TJYS
4.71
String Wt. (#)
275810
Pt. Mc Intyre P2-25 Casing Design Specifications
SURFACE CASING
13-3/8" 68#/FT K-55 & L-80 BTC CASING
BURST COLLAPSE
K-55 3450 1950
L-80 5020 2260
PBYS (#) TJYS (#) DEPTHS
1069000 1300000 (0'-80' TVD)
1556000 1585000 (80'-4000' TVD)
Burst Pressure Calculation
Burst rating based on shutting in the well on a gas kick equivalent to the
LOT (14.0 ppg) at the surface casing shoe. Worst case will be in the K-55
casing, which has no back up gradient.
LOT (ppg) TVD (FT) SiPRESSURE
14 4000 2912
Burst S,F, 1.18
Collapse Calculation
Collapse rating based on losing returns until the fluid level is below the surface casing shoe
Mud weight behind the surface casing is 9.5 ppg
Mud Wt. (ppg) TVD (FT) Collapse press
9.5 4000 1976
Collapse S.F. 1.1 4
Tension Calculation
Based on full string weight in mud
Casg Wt. (#/ft) MD (FT)
68 4745
PBYS
Tension S.F. 3.88
Mud Wt.
9.5 ppg
TJYS
4.71
String Wt. (#)
27581 0
Pt. Mc intyre P2-25 Casing Design Specifications
Production Casing
9-5/8", 47#,L-80,NSCC Casing
GRADE BURST
L-80 6870
COLLAPSE PBYS (#) TJYS (#)
4750 1086000 1161000
Burst Pressure Calculation
Burst rating based on have a tubing leak on top of full column of fluid
Worst case will be at the surface, which has no back up gradient.
srTP
3420
Burst S.F.
2.01
Collapse Calculation
Collapse rating based on annulus being evacuated due to gas lift
Mud weight behind the casing is 10.2 ppg
Gas Grad.
Mud Wt. (ppg) TVD (FT) (psi/ft) Collapse press
10.2 9126 0.1 3928
Collapse S.Fo 1.21
Tension Calculation
Based on full string weight in mud
Casg Wt. (#/ft) MD (FT)
47 15130
PBYS
Tension S.F. 1.81
Mud Wt.
10.2
TJYS
1.93
String Wt. (#)
600248
Pt. Mc lntyre P2-25 Casing Design Specifications
PRODUCTION LINER
7", 26#,L-80,FOX Casing
GRADE BURST
L-80 541 0
COLLAPSE PBYS (#) TJYS (Cf)
7240 604000 667000
Burst Pressure Calculation
Burst rating based on formation pressure on top of 9.7 ppg fluid
Fluid wt (ppg) back up (ppg) Burst Pressure
SITP 9.7 9.5 351 2
3420
Burst S.F. 1.54
Collapse Calculation
Collapse rating based on annulus being evacuated due to gas lift
Mud weight behind the casing is 10.2 ppg
Mud Wt. (ppg)
10.2
Collapse S.F.
· Gas Grad.
TVD (FT) (psi/ft) Collapse Press
9444 0.1 4065
1.78
Tension Calculation
Based on full string weight in mud
Casg Wt. (#/ft) MD (FT)
26 517
Mud Wt. String Wt. (#)
10.2 11346
Tension S.F. PBYS TJYS
53.23 58.79
Surface Casing Depth:
Surface Casing Size:
Surface Casing Weight:
Bit Diameter:
Excess Factor
Intermediate Casing Depth:
Intermediate Casing Size
Intermediate Casing Weight:
Proposed Top of Cement
Bit Diameter:
Excess Factor:
Liner Size:
Liner Weight:
Hole TD
Bit Diameter:
Excess Factor:
P2-25 Cement Volumes
Surface String
4745 LEAD
13 3/8
68
16
2 TAIL
Yield
Density
# sacks
Yield
Density
# sacks
TOP JOB
# sacks
Intermediate String
15130
9 5/8
47
13629
12 1/4
1.3
Liner
LEAD
TAIL
Yield
Density
# sacks
# bbls
Yield
Density
# sacks
# bbls
7
26
15497
8.5
1.4
TAIL
Yield
Density
# sacks
2.17
12
1657
1.16
15.8
400
250
1 .g8
'15
0
0
1.16
15.8
555
115
1.2
15.7
155
(3596 Cuo Ft.)
(464 CU. Ft.)
( 0 Cu. Ft.)
(644 Cu. Ft.)
(186 Cu. Ft.)
Computed by the SE Win-CADDS System ~._..~
Calculated using the Minimum Curvature Meth~
Normal Plane Method
Date:
10/14/92
REFERENCE WELL:
Prudhoe Bay Drilling
Point Mcintyre
Well: P2-25
File: P2-25WP1
TVD, N/S and E/W are measured from the WELLHEAD
WeLlpath SLot Distance
Pl-1/pm7 PI-1/PM7 7111.09
P1-11mwd P1-11 6880.33
p1-11 P1-11 6900.11
Pl-12/pm11 P1-12/PM11 8221.66
P1-2/pm3 P1-2/PM3 8221.98
P1-2OWP2 P1-20 8479.15
P1-25/pm12 P1-25/PM12 8553.73
P1-3/pm4 P1-3/PM4 6584.38
P1-7 P1-7/PM8 8285.58
P1-GlWP1 P1-G1 8094.79
p2-30wp2 P2-30 72.32
P2-49 P2-49 66.41
P2-50A P2-50 7833.15
P2-5OMI~) P2-50 404.56
p251mwd P2-51 379.44
P2-55WP P2-55 . 479.43
P2-55mwd P2-55 477.09
p2-56wp P2-56 494.85
P2-57/pm10 P2-57/PHlO 509.82
P2-58/pm6 P2-58/PM6 544.65
P2-59/PM9 P2-59/PM9 428.59
P2-60/pm13 P2-60/PM13 127.26
pm1 PM1 7318.44
I:,a2 PM2 8166.44
Closest Points
Direction Ref MD Ref TVD
268.91
272.87
269.33
250.47
242.98
243.56
243.63
274.79
243.39
241.06
191.37
107.83
165.43
202.29
224.28
202.67
204.48
202.12
201.85
217.18
258.28
144.50-
255.42
242.95
2226.24 2200.00
2887.55 2800.00
2772.53 2700.00
1605.15 1600.00
100.00 100.00
0.00 0.00
100.00 100.00
2887.55 2800.00
200.00 200.00
0.00 0.00
900.14 900.00
2332.79 2300.00
9542.16 6200.00
100.00 '100.00
1605.15 1600.00
700.01 700.00
900.14 900.00
100.00 100.00
100.00 100.00
0.00 0.00
1912.37 1900.00
2887.55 2800.00
3005.38 2900.00
300.00 300.00
AUDI #2
13 5/8" 5,000 psi Stack
2.00
·
4.12
12.72
4.50
I3.01
I
3.01
1.83
3.01
2.52
1.5
RKB I
I
RIG FLOOR
GROUND LEVEL
DRIP PAN
HYDRIL
PIPE RAM
17.88
BLIND RAM
MUD
CROSS
PIPE RAM
MUD
CROSS
ASE FLG
/
22.38
25.3~
30.23
34.25
35.75
SUF,., CE hoLE DIVERTER SYSTE?vl ......
Two lines venting gO deg. ap~rt in directions
that ensure safe down wind venling, and ex-
tending to a point at least 100' from any potential
source of ignition.
10' Fu[[ Opening Valves
35' or as required
,._1
Dresser Sleeve
10' Oiverter Line
1. All pipe connections 150# ANSI
Flanges or welded connections
and secured to prevent movemenL
2_ Manual 10' full opening valves
m~hanic~lly connected to ensure
that one valve is fail-safe open at
ali limes.
,.3. All tums are go deg. and
targeted.
1 O' Full opening ball valve w/Hydraulic
Actuator
Cellar
20' Diverter Spool wf 10' Side Oude~.
MEM 1/'3/90
-i~~it ii_~ ......
['1LID
D~t~O qlb'll
D£tlC o I]. ]
~0 BBL
.
50 Po/. 50
~;~JD.,
I q,~#· -
TO
T^,j ·
4BI! w/16 oones (Desil~er)
1 - Driloo Rhrospheric Mud Degasmer
1 - 200 gpm Operating Capacity. Centrifuge
15 - Brandt MA5 Hud Mix AgJ. tators 1- 150 bbl. Trip TaD. k
1 - Raoording drilling fluid pit level
indicator with boU] visual and audio
warning devices at driller's console '
1.-Drilling fluid flc~4 sen~or
with readout at drili~/k~.',s
console
Alaska
P~,,,25
Pt. Moln ,tyre
'10/2.'I /9'2,,
M, lk4inder
Casing Iht !nt IDeso D~.:;~, s a tD c,,,,,s c: 'Tension
~' ~
· ;.,~ ze Bott(~ m To p I.,,,e n gth L,b s L~rade 'T'h read L,,,b s
1A 20 'f 15 37 78 gt. 5 H.,,4,CI Weld 0
aA 'I 3.(~'75 102 36 88 (.~8 1(-,55 Et'T'C 0
3A ~ 3.375 4.000 38 4:712 68 L,.80 E]'T'C 0
4A 9,8~S 9i 26 35 15097 4.7 r~"FS0,,,S NSCC 0
~LA 7 94.4,& 8996 5'f 3 ~6 'f 3C1:::~ Fox 0
8A 0 O 0 0 0 0 0 0
7A 0 0 0 0 0 0 0 0
$~ 0 0 0 0 (:) 0 0
9A 0 0 0 0 0 0 0 0
10A 0 0 0 0 0 0 0
'7~,~
1
Wie,ght
PPg
9,5
10,2
0,0
Q.0
0.0
I,..4ydra~ulic~
Gr~die, nf
psi/ft
0.000
O.4"94"
0,494.
0.530
0.530
0,000
0.000
0.0O0
0,000
0,000
Mao4Jmum
8830
,'.~,'.],:~0
3"7'18
3'718
0
0
0
0
0
IVfinimum
Yield
psi
0
5020
687O
'724-0
0
O.
0
#. VAL~J~E [
1.9
1 ¢:
3C
6C
7C
9C
10C:
'T'ensior~
I~Lbs
7.137
4,.4.88
320,4.16
'7Qg,559
1..:~ ..:~..~
0
0
O.
0
Stt'en gd-'~
l~Lbs
0
1069
'I (386
0
0
0
0
CJ
r,::.'r...[.]o, t-.F:"s i
0
60
1976
4494,0
5009
0
0
0
0
0
Re,~sist,
0
2260
4.750
54.10
0
0
0
0
0
#
ITEM APPROVE DATE
El) Fee
E 2) Loc
[~ thru 8] '
Company
** CHECK LIST FOR NEW WELL PERMITS **
YES
Is permit fee attached ............................................... ~__
Is well to be located in a defined pool ..............................
z[~ thru 13] ' - -"
[ 10 & 13]
.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
[14 thru 22]
NO REMARKS
.
2.
3. Is well located proper distance from property line ................... ~
4. Is well located proper distance from other wells .....................
5. Is sufficient undedicated acreage available in this pool ............. ~
6. Is well to be deviated & is wellbore plat included ...................
7. Is operator the only affected party ..................................
8. Can permit be approved before 15-day wait ............................
·
(5) BOPE '~,~ ?~)'-M~~
[23 thru 28]
Does operator have a bond in force ...................................
Is a conservation order needed .......................................
Is administrative approval needed ....................................
Is lease nLrnber appropriate ..........................................
Does well have a unique name & number ................................
Is conductor string provided .........................................
Will surface casing protect all zones reasonably expected
to serve as an underground source of drinking water ..................
Is enough cement used to circulate on conductor & surface ............
Will cement tie in surface & intermediate or production strings ......
Wi l 1 cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wel l bore separation proposed .............................
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to ,~o~> psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
E29 thru 31]
E7) Contact
(8) Addl -.-,.',.,:i"'. l&-~;-~...
geology' engineering:
RP ,.~. BEW "O D~7~I~uL/-
rev 08/18/~2
jo/fi. Oil
29.
30.
31.
32.
33.
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Name and phone number of contact to supply weekly progress data ......
Additional requirements .............................................
///.,4 ,
//'
Additional remarks'
INITIAL GEOL UNIT ON/OFF
POOL CLASS STATUS AREA ~ SHORE
0
--I
'TZ