Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout192-046XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~"~¢~' File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: Other- Pages: DIGITAL DATA Diskettes, No. [] Other, No/Type OVERSIZED .[] ' Logs-of various kinds Other COMMENTS: Scanned by: Beverly Dia~an Lowell n TO RE-SCAN Notes: - Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ • ConocoPhllips a~~ P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2010 Mr. Dan Seamount Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Dan Seaniount: ~ ~EC~EI~E~ APR p 5' ~Z010 Alaska pit & Gas Cons. Corn~ission a~ 1~a"0~-~ 3 a- ~ ~ Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRLI). Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped March 2 and 21, 2010. The corrosion inhibitor/sealant was pumped March 27, 28 and 29, 2010. The attached spreadsheet presents the well name, trop of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Perry Klein at 907-659-7043, if you have any questions. Sincerely, MJ L veland ConocoPhillips Well Integrity Projects Supervisor • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 3/31/10 30. 3R ~r ~r: ~N ~~ ~~ inn zn n zo oen~~ ell Name PI # TD # Initial top o cement Vol. of cement um ed -. Final top of cement __~ __~ . .~ ~. Cement top off date ~ ~.., ,, .y .. Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al 3A-02 50029214310000 1852050 SurFace n/a 26" n/a 4.25 3/29/2010 3A-04 50029214330000 1852070 SF n/a 26" n/a 4.25 3/29/2010 3A-07 50029214440000 1852230 SF n/a 25" n/a 4.25 3/29/2010 3A-16 50029214920000 1852840 SF n/a 23" Na 3.4 3/29/2010 3B-10 50029213660000 1851140 6'6" n/a 6'6" Na 25.5 3/28/2010 3C-11 50029213570000 1851020 SF n/a 25" n/a 4.25 3/27/2010 3G-08 50103201280000 1900650 SF 0.65 27" 3/2/10 5.52 3/28/2010 3G-09 50103201290000 1900670 SF 0.60 22" 312/10 4.67 3/28/201-0 3G-22 50103201470000 1901420 SF n/a 22" n/a 4.25 3/28/2010 3H-01 50103200840000 1871100 SF n/a 21" n/a 4.25 3/28/2010 3H-03 50103200850000 1871110 17" 0.40 8" 3/21/10 1.7 3/28/2010 3H-14B 50103200920200 2050210 SF n/a 23" n/a 3.4 3/29/2010 31-02 50029215150000 1853080 SF n/a 22" n/a 2.97 3/29/2010 31-10 50029219340000 1890370 39' 3.50 24" 3/21/10 3.4 3/29/2010 3J-04 50029214000000 1851650 SF n/a 23" n/a 3.4 3/28/2010 3J-14 50029214960000 1852880 SF n/a 25" n/a 4.67 3/28/2010 3J-15 50029214970000 1852890 SF Na 22" n/a 3.4 3/28/2010 3M-05 50029217060000 1870250 SF Na 21" n/a 3.4 3/29/2010 3M-07 50029217080000 1870270 SF n/a 22" n/a 4.25 3/29/2010 30-09 50029218250000 1880610 SF Na 23" n/a 4.25 3/27/2010 30-16A 50029217960100 1880430 SF n/a 22" n/a 3.52 3/27/2010 3R-10A 50029222530100 1920310 SF n/a 21" n/a 4.25 3/27/2010 3R-11 D 50029222480000 1920160 SF n/a 17" n/a 3.25 3/27/2010 3R-15 50029222580000 1920340 SF n/a 24" n/a 3.82 3/27/2010 3R-19 50029222690000 1920460 1" Na 21" Na 5.1 3/27/2010 3R-25 50029226220000 1951810 SF n/a 21" n/a 5.52 3/27/2010 1 ,.... \J L-I -, '-...., . . OCT 0 3 tOD6 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Alaska Oil & Gas Cons. Comm¡s~j¡:1iì Anchorage REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon D Repair Well D Plug Perforations D Stimulate D Other D Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension D Change Approved Program D Ope rat. ShutdownD Perforate 0 Re-enter Suspended Well D 2. Operator Name: 4. Current Well Status: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development 0 Exploratory D 192-0461 3. Address: Stratigraphic D Service D 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-22269-00 . 7. KB Elevation (ft): 9. Well Name and Number: RKB 52', Pad 11' GL 3R-19 8. Property Designa!ion: 10. Field/Pool(s): ADL 25513, ALK 2554 Kuparuk River Field 1 Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth measured 9036' feet true vertical 6646' . feet Plugs (measured) Effective Depth measured 7657' feet Junk (measured) true vertical 6623' feet Casing Length Size MD TVD Burst Collapse Structural CONDUCTOR 79' 16" 121' 121' SURF. CASING 4018' 9-5/8" 4059' 4059' PROD. CASING 8982' 7" 9023' 6646' 7682'-7708',7750'-7850',7900'-7970', 7980'-8070', 8080'-8170', 8180'-8270', 8280'-8370', 8420'-8510', 8520'-8610', 8620'-8710', Perforation depth: Measured depth: 8720'-8810',8820'-8920' true vertical depth: 6628'-6632',6638'-6650',6655'-6660', 6660'-6658', 6658'-6654', 6654'-6653', 6653'-6653', 6653'-6653', 6653'-6652', 6652'-6652', 6652'-6651',6651'-6649' Tubing (size, grade, and measured depth) 3-1/2" , J-55, 7579' MD. ~;;C '" ""u\.r·~;rJ (: 'cd ,,",. ',;-' Packers & SSSV (type & measured depth) pkr= BAKER 'HB' pkr= 7550' Camco'TRDP-4A' SSSV= 1796' 12. Stimulation or cement squeeze summary: Intervals treated (measured) not applicable I reatment deSCriptions including volumes -..-...,,, '",,:.--...- -,"..~-.- ',,- - used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Met Water-Bbl Casino Pressure Tubino Pressure Prior to well operation 451 . 1284 1062 -- 137 Subsequent to operation 624 . 1668 1995 -- 139 14. Attachments 15. Well Class after proposed work: Copies of Logs and Surveys run _ Exploratory D Development 0 Service D Daily Report of Well Operations _X 16. Well Status after proposed work: Oil0 GasD WAGD GINJD WINJD WDSPL D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A it C.O. Exempt: n/a Contact Howard Gober @ 263-4220 Printed Name Howard Gober Title Wells Group Engineer Jolz'¡o(p Signature <íZ ~" Phone Date , PreDared bv Sharon AI/sun-Drake 263-4612 Form 10-404 Revised 04/2004 ORIGINAL RBDMS 8Ft 0 C1 () 4 2006klO ('-( ..;4Å /(,). ~ .ðfo ~í~~~ ConocoPhllllps 'aSka, Inc:, . KRU 3R-19 ~ 3R-19 API: 500292226900 Well Type: PROD AnQle @ TS: 76 deQ @ 7635 WROP SSSV Type: WRDP Orig Completion: 5/16/1992 Anale @ TD: 91 dea @ 9036 ( 1796-1797, Annular Fluid: Last W/O: Rev Reason: ResetWRDP, 00:2.812) Slipstop,PERF Reference Loq: Ref Loa Date: Last Update: 9/29/2006 Last Tag: 7657' RKB TD: 9036 ftKB Last TaQ Date: 10/28/2004 Max Hole Anale: 9=:-=86 Casing String - ALL STRINGS Description Size Top Bottom rvD Wt Grade Thread CONDUCTOR 16.000 0 79 79 62.58 H-40 SURF. CASING 9.625 0 4059 4059 36.00 J-55 PROD. CASING 7.000 0 9023 6646 26.00 J-55/N-8C Tubing String - TUBING Size I Toe I Bottom I TVD I Wt , Grade Thread 3.500 0 I 7579 I 6602 I 9.30 I J-55 I AB MOD EUE Perforations Summary Interval rvD Zone Status Ft SPF Date Type Comment 7682 - 7708 6628 - 6632 A-3 26 6 9/23/2006 APERF 2.5" 35B Ultra Pk , 60 deg ph 7750 - 7850 6638 - 6650 A-2 100 6 9/23/2006 APERF 2.5" 358 Ultra Pk , 60 deg ph 7900 - 7970 6655 - 6660 A-1 70 2 7/31/1992 APERF 180 deg ph; 4.5" HSD U Itrapak 7980 - 8070 6660 - 6658 A-1 90 2 7/31/1992 APERF 180 deg ph; 4.5" HSD Ultrapak 8080 - 8170 6658 - 6654 A-1 90 2 7/31/1992 APERF 180 deg ph; 4.5" HSD Ultrapak 8180 - 8270 6654 - 6653 A-1 90 2 7/31/1992 APERF 180 deg ph; 4.5" HSD Ultrapak 8280 - 8370 6653 - 6653 A-1 90 2 7/31/1992 APERF 180 deg ph; 4.5" HSD Ultrapak 8420 - 8510 6653 - 6653 A-1 90 2 7/24/1992 IPERF 180 dea ph; SOS TCP Gun 8520 - 8610 6653 - 6652 A-1 90 2 7/24/1992 IPERF 180 deQ ph; SOS TCP Gun 8620 - 8710 6652 - 6652 A-1 90 2 7/24/1992 IPERF 180 dea ph; SOS TCP Gun PBR 8720 - 8810 6652 - 6651 A-1 90 2 7/24/1992 IPERF 180 deQ ph; SOS TCP Gun (7537-7538, 8820 - 8920 6651 - 6649 A-1 100 2 7/24/1992 IPERF 180 dea ph; SOS TCP Gun 00:3.500) Gas Lift MandrelsNalves St MD TVD Man Man Type VMfr V Type VOD Latch Port TRO Date Run Vlv PKR Mfr Cmnt (7550-7551, 1 2563 2563 MACCO SPM-1A GLV 1.0 BK 0.156 1240 1/17/2006 00:6.151) 2 3926 3926 MACCO SPM-1A GLV 1.0 BK 0.188 1285 1/17/2006 3 4630 4627 MACCO SPM-1A GLV 1.0 BK 0.250 1380 1/17/2006 4 5271 5241 MACCO SPM-1A OV 1.0 BK 0.313 0 1/2/2006 NIP 5 5911 5772 MACCO SPM-1A DMY 1.0 BK 0.000 0 2/19/2003 (7567-7568, 6 6644 6199 Cameo MMG-2 DMY 1.5 RK 0.000 0 2/19/2003 00:3.500) 7 7480 6567 Cameo MMG-2 DMY 1.5 RK 0.000 0 2/22/1998 TUBING Other plugs, equip., etc.) . COMPLETION (0-7579, Decth TVD TVDe Description ID 00:3.500, 1796 1796 WRDP 3.5" WRDP I SSSV (SER# HXS-221) ON B-7 LOCK (2.81" NO-GO) @ 1.500 10:2.992) 1796' RKB. SET 3" SLIP STOP ON TOP OF SSSV @ 1794' Set 9/27/2006 1796 1796 SSSV Camco 'TRDP-4A' LOCKED OUT 5/8/99. 2.812 - ---- 7537 6588 PBR Baker 10' stroke 3.000 7550 6592 PKR Baker 'HB' 2.890 - I--- 7567 6598 NIP Cameo '0' Nipple NO GO 2.750 7578 6602 SOS Baker 2.992 - I--- 7579 6602 TTL 2.992 Perf - ---- (7900-7970) - I--- General Notes ~ f-- Date I Note Perf - ---- 2/22/1998 Last tag @ 7730', high tag due to deviation of 77 deg. and fill laying on bottom side of CSG (7980-8070) - ---- - F- Perf - I-- (8080-8170) - I-- ~ I--- Perf -- ---- (8180-8270) - I--- - I-- Perf - I-- (8280-8370) -- ---- - I-- Perf (8420-8510) = - 0 t== - r--- Perf - ---- (8620-8710) = t== - - I--- - r--- Perf _.~ - I-- (8820-8920) - ---- . 3R-19 Well Events Summary . DATE Summary 9/2/06 PULLED SLIP STOP @ 1796' RKB. PULLED WRDP @ 1796' RKB. DRIFT 20' X 2.5" TO 6114' SLM. DRIFT 10' X 2.5" DUMMY GUN TO 6884' SLM (TTL @ 7579' RKB). ABLE TO GET 20' X 2.5" TO 6470' SLM WI PUMP ASST @ 2 BPM BUT HAVE TO RIH FAST TO CLEAR SOME TIGHT SPOTS. 9/5/06 SET 3.5" WRDP-II ON 2.81" B-7 LOCK (SERIAL#: HYS-563, OAL=105", MIN 10=1.50") & SLIP STOP @ 1796' RKB. 9/15/06 PULLED SLIP STOP @ WRDP-II ON 2.81" B-7 LOCK @ 1796' RKB. 9/17/06 RIH with 2.70" mill, motor, & MHA to 7660' no motor work detected, very little scale returns to surface. Previous est. BHP 3200 psi, now estimated BHP is 2600 psi. Could not hold a column of water. POOH pumping diesel to switch BHA to jetting nozzle. RIH with 2" jet swirl nozzle to 7650' begin FCO procedure to 7950' taking 60' bites & wiping TT(7600'). 9/18/06 DRIFT TBG TO 7612' SLM wi USED DUMMY GUNS 23' - 2.5" & PUMP ASSIST. JOB COMPLETE. 9/19/06 ATTEMPT TO PERFORATE USING WELL TEC TRACTOR. UNABLE TO REACH REQUIRED DEPTHS. TOOLS INITIALLY STOPPED FALLING AT 6492' (57 DEG DEV). ABLE TO WORK THROUGH, BUT STOPPED AGAIN AT 6883' (64 DEG DEV). UNABLE TO FALL OR TRACTOR AT THIS DEPTH. 9/22/06 USED i-COIL CCL TO MADE TWO PERFORATING RUN WITH TWO 20ft 2.5in GUN TO PERFORATED FROM 7810 TO 7850 i-COIL CORRECTED DEPTH.BHP @ PERFORATING ZONE WAS 3060 PSI @ 161 DEG BEFORE AND AFTER FIRING GUNS.JOB IN PROGRESS 9/23/06 MADE TWO 20 FEET 2.5" PERF GUN RUNS AND PERFORATED A2 ZONES FROM 7770' TO 7810' iCOIL CCL CORRECTED DEPTH.BHP AT PERF ZONE WAS 3120 PSI @ 161 DEG.JOB IN PROGRESS. 9/24/06 PERF A2 ZONE FROM 7750'-7770' WITH A 20 FEET OF 2.5" GUNS AND A3 ZONE FROM 7682'-7708' WITH 26 FEET OF 2.5" GUNS i-COIL CCL CORRECTED DEPTH.BHP WAS 3300 PSI @ 161 DEG.TURN WELL OVER TO DSO TO BRING ON LINE TO START FLOW TEST. JOB COMPLETE. " THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 13 2000 E E W MATER -:TH I'S I A L M A' U N D E -R K-E R C:LORILMFILM.DOC R PERMIT DATA 92-046 CBT 92-046 CDN 92-046 CDR 92-046 CET 92-046 407 92-046 DAILY WELL OP 92-046 SURVEY i ~OGCC Individual Geological Materials T DATA_PLUS L 7100-8620 Well Inventory L 4059-9037 L 4059-9037 L 7100-8640 R COMP DATE:08/15/92 R 05/04-08/05/92 R 0.00-9036 92-046 5267 T 4059-9037 Are dry ditch samples required? yes/"no~.4%nd received? Was the well cored? ye~/o/K~~ description received? Are well tests required.~--~e~/~ceived? ~ Well is in c°mplian~~ial COMMENTS Page: 1 Date: 09/21/94 RUN DATE_RECVD 1 05/29/94 1 05/22/92 1 05/22/92 1 05/29/94 09/04/92 09/04/92 06/02/92 ALL 06/02/92 STATE OF ~ ~ OIL AND GAS CONSERVATION COMMIt::~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown ~ Pull tubing Alter casing Stimulate X Plugging Repair well Perforate Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 1991' FNL, 2443' FWL, Sec. 9, T13N, R9E, UM At top of productive interval 1529' FSL, 2045' FWL, Sec. 9, T13N, R9E, UM At effective depth 67' FSL, 1643' FWL, Sec. 9, T13N, R9E, UM At total depth 27' FNL, 1623' FWL~ Sec. 16~ T13N~ R9E, UM 12. Present well condition summary Total Depth: measured 9 0 3 6' feet true vertical 6 6 4 6 feet Plugs (measured) 6. Datum elevation (DF or KB) RKB 52' 7. Unit or Property name Kuparuk River Unit 8. Well number 3R-19 9. Permit number/approval number 92-46 10. APl number 50-029-2226900 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 8 9 3 6' feet true vertical 6648' feet Junk (measured) Casing Length Size Structural 80' 1 6" Conductor 4 01 8' 9-5/8" Surface Intermediate Production 8 9 8 2' 7" Liner Perforation depth: measured 7900'-8370', true vertical 6655'-6653', Cemented Measured depth True vertical depth 215 PF 2 CMT 121' 121' 700 SX PF 'E' CMT, 4059 4059' 48O SX CLASS G 530 SX CLASS G 9023' 6 6 4 6' 8420'-8920' 6653'-6649 Tubing (size, grade, and measured depth) 3-1/2" 9.3# J-55 @ 7579' Packers and SSSV (type and measured depth) BAKER HB ,~ 7550'~ CAMCO TRDP-4A ~ 1796' 13. Stimulation or cement squeeze summary 'A' SAND FRACTURE TREATMENT Intervals treated (measured) 7900'-8370'-8420'-8920' Treatment description including volumes used and final pressure SEE A'I-i'ACHED WELL SERVICE REPORT SUMMARY 14. Reoresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Prior to well operation 0 0 0 0 DEC 1 6 ]992 ~OJt & Gas Cons. Comrmss,~" ' c :orage Tubing Pressure 0 Subseguent to operation 2322 201 6 47 700 162 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run__ Water Injector m Daily Report of Well Operations X Oil X Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service Form 10-404 Rev 09/12/90 Title Petroleum Engineer Date SUBMIT IN DUPLICATE MORNING REPORT SUMMARY 07/27/92 TO 07/27/92 CPF-3 DS-3R 3R-19 07/27/92 INITIAL FRACTURE TREATMENT WITH DS YF140D (HORIZONTAL WELL). PUMPED 1003 BBL BREAKDOWN @ 70 BPM. LAST WHTP=3057 PSI, ISIP=1615 PSI, FG=0.69 PSI/FT, EXCESS FRICTION=600 PSI. PUMPED 1400 BBL PAD, PUMPED 243.3 MLBS. 16/20 CARBOLITE IN 1 TO 8 PPA STAGES. FLUSHED JOB TO COMPLETION 16 BBLS SHORT OF TOP PERF. TAGGED 1 TO 5 PPA STAGES WITH SCANDIUM TRACER & 6 TO 8 PPA STAGES WITH GOLD TRACER. TOT PROPPANT: DESIGNED 238.2 MLBS., IN FORMATION 238.0 MLBS W/8.0 PPA @ PERFS. TOT FLUIDS: WATER 3144 BBLS, DIESEL 105 BBLS (FLA), BRINE (FLUSH) 249 BBLS. ALL FLUIDS LOOKED GOOD. (LENZ/BRADLEY/CORBELL/GOLDEN) DEC ~ ~ 399 ~il & (~as Cons. Commissio~ I Status of Well STATE OF ALASKA 0 R I G I ALAbKA OIL AND GAS CONSERVATION CO~v, MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well OIL r-~ GAS r--1 SUSPENDED [~] ABANDONED ["-] SERVICE r--'] 2 Name of Operator ARCO Alaska, Inc 3 Address P.O. Box 100360, Anchorage, AK 99510-0360 4 Location of well at surface 1991' FNL,2443' FWL, SEC 9, T13N, R9E, UM At Top Producing Interval 1529' FSL, 2045' FWL, SEC 9, T13N, RgE, UM At Total Depth 27' FNL, 1623' FWL, SEC 16, T13N, R9E, UM 5 Elevation in feet (indicate KB, DF, etc.) RKB 52', PAD 11' GL 12 Date Spudded 05/04/92. ADL 25513, ALK 2554 17 Total Depth (MD+TVD) 9036' MD ,6646' TVD 22 Type Electdc or Other Logs Run 13 Date T.D. Reached 05/13/92. 6 Lease Designation and Serial No. 14 Date Comp., Susp. or Aband. 08/05/92. 19 Directional Survey I-I 7 IPermit Number I 92-46 8 APl Number 50-029-22269 9 Unit or Lease Name KUPARUK RIVER 10 Well Number 3R-19 11 Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL Water Depth, if offshore 16 No. of Completions NA feet MSL 1 18 Plug Back Depth (MD+TVD) 8936' MD, 6648' TVD 20 Depth where SSSV set 1796' feet MD Thickness of permafrost APPROX 1700' CDR/CDN/CBL/CET/GCT 23 CASING SIZE WT. PER FT. 16" 62.5# H-40 9-5/8" 36# J-55 7" 26# J-55/N-80 1 GRADE CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD TOP Bo'FrOM SURF 121' SURF 4059' SURF 9023' 24 Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) 7900' - 8370' W/4-1/2" CSG GUN @ 2 SPF MD 6655'-6653' TVD 6653'-6649'TVD 8420'-8920' W/4-1/2" CSG GUN @ 2 SPF MD HOLE SIZE CEMENTING RECORD AMOUNT PULLED 24" 215 PF 2 CMT 12-1/4" 700 SX PF "E" CMT, 480 SX CLASS G 8-1/2" 530 SX CLASS G CMT 25 TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) ,,, 3-1/2", 9.3# J-55 7579' 7550 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED I *SEE ATTACHED FRAC/STIMULATION SUMMARY 27 Date First Production PRODUCTION TEST IMethod of Operation (Flowing, gas lift, etc.) Date of Test I Hours Tested I PRODUCTION FOR I I TEST PERIOD Flow Tubing ICasing Pressure ICALCULATED Press. J 124-HOUR RATE OIL-BBL OIL-BBL IGAS-MCF GAS-MCF 28 CORE DATA WATER-BBL WATER-BBL CHOKE SIZE I GAS-OIL RATIO O L GRAVITY-APl (corr) Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. S E P - 4 1992 Alaska 0il & Gas Cons. C0mmissi0.n nch.0ral], Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate "29.' ' ' ",' ! 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. NA TOP KUPARUK C 7406' 6540' BASE KU PARUK C 7680' 6628' TOP KUPARUK A 7680' 6628' BASE KUPARUK C NP NP REPORT OF OPERATIONS, GCT SURVEY, FRACTURE/STIMULATION SUMMARY ~a~0~"_~ 32. I hereby certify that the foregoing is true and correct to the best of my knowledge "~ ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion); so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Stage 1. Data Frac Stage 2 Flush ADDENDUM WELL 3R-19: 8/2 0/91 3R-19 Frac KRU "A" sand perfs from 8420'-8920 Frac pumped down 7" csg.' Pmp 650 bbls YFOD XL GW @ 70 BPM 3000-3800-3735 psi Pmp 350 bbls YF140D Non XLGW @ 70 BPM 3735-3057 psi ISlP: 1615 FRAC GRAD: .69 PERF FRIC' 600 psi Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8 Stage 9 Stage 10 Stage 11 Stage 12 Stage 13 Pmp Pmp Pmp Pmp Pmp Pmp Pmp Pmp 1400 bbls YF1400 XLGW @ 70 BPM 3588-3511 psi 250 bbls YF 1400 XLGW w/lppg 16/20 CL@ 70 BPM 3511-3337 psi 250 bbls YF1400 XL GW w/2ppg 16/20 CL@ 70 bpm3337-3121 psi 250 bbls YF1400 XL GW w/3ppg 16/20 CL@ 70 bpm 3121-2943 psi 250 bbls YF1400XL GW w/4 ppg 16/20 CL @ 70 bpm 2943-2778 psi 200 bbls YF1400XL GW W/5 ppg 16/20 CL @ 70 bpm 2778-2700 psi 200 bbls YF1400XL GW w/6 ppg 16/20 CL @ 70 bpm 2700-2549 psi 150 bbls YF1400XL GW wi7 ppg 16/20 CL @ 70 bpm 2549-2467 psi Pmp 150 bbls YF1400XL GW w/8 ppg 16/20 CL @ 70 bpm 2467-2302 psi Flush 55 bbls YF1400 XL GW @ 70 bpm 2302-2350 psi Flush 250 bbls 10.4 NACL/NABR @ 70 bpm 2350-2470 psi Job flushed to completion(16 bbls shod of top perf). Stages 4-8 tagged w/RA tracer(Scandium 46) Stage 9-11 tagged w/RA tracer (Gold 198). Last 70 bbls of stage 11 was not tagged w/tracer. EMW of flush & carbo-lite to top perf= _+ 10.1 ppg. ISIP' 1615 psi Fluid to Recover: 3144 sw/104 diesel Avg Press: 2700 psi Sand in Zone: 238,000 #16/20 CL(8.2 ppg @ perfs) Sand in Csg: 5303# RECEIVED SEP - 4 Gas Cons. Commission ~nch0rago ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: FIELD: LEASE: API: PERMIT: APPROVAL: 3R-19 NORTH SLOPE BOROUGH KUPARUK RIVER KUPARUK RIVER 50-029-22269 92-46 ACCEPT: 05/03/92 09:05 SPUD: 05/04/92 04:05 RELEASE: 08/05/92 04:08 OPERATION: DCP+F DRLG RIG: PARKER 245 WO/C RIG: NORDIC 1 05/04/92 (1) TD: 182' ( 182) 05/05/92 (2) TD: 3200' (3018) 05/06/92 (3) TD: 4080' ( 880) 05/07/92 (4) TD: 4080' ( 0) DRILLING MW: 9.1 VIS: 87 MOVE RIG FROM 3R-14 TO 3R-19. ACCEPT RIG @ 2100 HRS 5/3/92. NIPPLE UP DIVERTER SYSTEM. FUNCTION TEST SAME. ACTUATOR VALVE FAILED. REPAIR SAME. MIX SPUD MUD. M/U BHA. SPUD @ 0430 5/4/92/ DRILL F/ 90'-182'. ADT .5 HRS. SHORT TRIP TO 1100' MW: 9.8 VIS: 54 DRILL F/ 182'-2137'. ADT 10 HRS. CIRC PUMP SLUG. SHORT TRIP TO 1100'. NO PROBLEMS. NO FILL. DRILL F/ 2137'-3200'. ADT 4.75 HRS. SHORT TRIP. FIRST 5 STANDS PULLED FREE. STANDS 7&8 PULLED 50K AND SWABBED IN 2 BBLS. PUMP OUT #8. CONT POOH W/ 10-20K INTERMITTENT DRAG. #13 PULLING 10-30K AND SWABBING. KELLY UP TO PUMP OUT. WAIT ON CASING SLIPS MW: 9.6 VIS: 46 RIH. DRILL F/ 3200'-4080'. ADT 8.25 HRS. CIRC AND CONDITION HOLE. POH TO 1950'. HOLE TIGHT AND SWABBING F/ 3352'-3167'.. RIH. WASH 70' TO BOTTOM. NO TIGHT SPOTS. NO FILL. CIRC AND CONDITION HOLE FOR 9-5/8" CSG. POH L/D BHA. P/U SHOE JT AND FLOAT JT. M/U JT #3 & #4. JT #3 SLIPPED IN CSG SLIPS TO THE COLLAR. PULL SLIPS OFF HOLE AND INSPECT INSERTS. ORDER NEW INSERTS. WAIT ON 9-5/8" CSG SLIPS. PICKING UP BHA MW: 9.0 VIS: 31 P/U NEW 9-5/8" CSG SLIPS AND SPIDER. RIH W/ 9-5/8" J-55 CSG TO 2000'. BREAK CIRC @ 2000'. FINISH RUNNING 9-5/8" CSG. TOTAL 100 JTS. M/U CSG HANGER AND LANDING JT. M/U CEMENT HEAD. BREAK CIRC AT SLOW RATE. RECIPROCATE CSG, INCREASE RATE TO 6 BPM. CEMENT CSG AS FOLLOWS. DROP PLUG #1. TEST LINES TO 2500 PSI. PUMP 100 BBL WATER. DROP PLUG #2. MIX AND PUMP 700 SX (246 BBL) TYPE E CEMENT FOLLOWED BY 480 SX (98 BBL) CLASS G CEMENT. DISPLACE W/ 307 BBL WATER. BUMPED PLUG W/ 2000 PSI. FLOAT CHECK OK. HAD GOOD RETURNS UNTIL 60 BBL DISPLACEMENT LEFT TO PUMP. CIRC PACKED OFF. DID NOT GET ANY CEMENT RETURNS. N/D DIVERETER. R/U FOR TOP CEMENT JOB ON 16"X9-5/8" ANNULUS. PUMP 133 SX (23 BBL) PERMAFROST C CEMENT. INSTALL CSG HEAD. N/U BOP. SET TEST PLUG. TEST @ 300 & 3000 PSI. ALL TESTS GOOD. SLIP AND CUT 137' DRILLING LINE. P/U BHA. WELL : 3R-19 OPERATION: RIG : PARKER 245 PAGE: 2 05/08/92 (5) TD: 5030' ( 950) 05/09/92 (6) TD: 7150' (2120) 05/10/92 (7) TD: 7532' ( 382) 05/11/92 ( 8) TD: 8032' ( 500) 05/12/92 (9) TD: 8400' ( 368) 05/13/92 (10) TD: 8819' ( 419) DRILLING MW: 9.0 VIS: 35 P/U BHA. RIH. TAG CEMENT STRINGER @ 3961'. TSET 9-5/8" CCSG TO 2000 PSI. LOST 75 PSI IN 15 MIN. DRILL CEMENT F/ 3961'-3974'. DRILL PLUGS F/ 3974'-3976'. DRILL CEMENT F/ 3976'-4080'. DRILL 10' NEW FORMATION F/ 4080'-4090'. CIRC BOTTOMS UP. PERFORM SHOE TEST @ 4090' MD TO 12.5 EMW. DRILL F/ 4090'-4513'. MWD PROBLEMS. ATTEMPT TO CORRECT. NO RESULTS. TOOL FAILURE. POH. L/D BHA. P/U NEW TOOLS. LOAD SOURCE. PROGRAM TOOLS. RIH TO 455'. TEST MWD-OK. RIH. RESURVEY @ 4303',4397', AND 4491'. DRILL F/ 4513'-5030'. ADT 3.5 HRS. WIPE HOLE TO 9-5/8" SHOE MW:10.3 VIS: 45 DRILL AND SURVEY F/ 5030'-7150'. ADT 16 HRS. CIRC BOTTOMS UP. PUMP SLUG. WIPE HOLE TO 9-5/8" SHOE. HOLE IN GOOD SHAPE. RIH MW:10.5 VIS: 44 RIH. TOOK 35000# TO PUSH THROUGH 6105'-6165' DRILL AND SURVEY F/ 7150'-7532'. ADT 7.5 HRS. CIRC BOTTOMS UP. POH. L/D BHA. M/U NEW BHA. RIH TO 9-5/8" SHOE. SLIP AND CUT 70' DRLG LINE. RIH. DRILLING MW:10.5 VIS: 44 RIH. WASH 60' TO BOTTOM. NO FILL. DRILL AND SURVEY F/ 7532'-8032'. ADT 14 HRS. DRILLING MW:10.5 VIS: 46 DRILL AND SURVEY F/ 8032'-8344'. CIRC BOTTOMS UP. POH FOR BIT CHANGE. DOWNLOAD LWD INFO (UNABLE TO GET INFO OUT OF CDN DUE TO LOW BATTERIES). M/U BHA. RIH. CHECK TOOLS. BREAK CIRC @ 9-5/8" SHOE AND @ 7150'. NO FILL. DRILL F/ 8344'-8365'. CIRC OUT TRIP GAS. MUD WT. CUT TO 8.1 PPG. DRILL F/8365'-8400'. NOTE: INSTALLED NEW CDN BATTERIES AND RETRIEVED ALL INFO. DRILLING MW:10.5 VIS: 43 DRILL AND SURVEY F/8400'-8680'. CIRCULATE. WIPE HOLE F/8680'-7288' 25-45 DRAG. MUD CUT TO 9.8 PPG. WASH TO BOTTOM. 3' OF FILL. DRILL AND SURVEY F/8680-8819'. RECEIVED S E P - 4 992 Alaska Oil ,2 6as Cons. 5ommissJon Anchorage WELL : 3R-19 OPERATION: RIG : PARKER 245 PAGE: 3 05/14/92 (11) TD: 9036' ( 217) 05/15/92 (12) TD: 9036' ( 0) 05/16/92 (13) TD: 9036' ( 0) POH TO RUN 7" CASING MW:10.7 VIS: 44 DRILL AND SURVEY F/8819'-9036'. CIRC HOLE CLEAN. WIPE HOLE TO 9-5/8" SHOE @ 4059. 80-100K DRAG F/7566'-7472'. WORK UNTIL FREE. 25-45K DRAG REMAINDER OF TRIP. SLIP AND CUT 112' DRLG LINE. RIH. NO TIGHT SPOTS. WASH 70' TO BOTTOM. NO FILL. CIRC AND CONDITION MUD FOR 7" CASING. PUMPED 40 BBL HIGH VISCOSITY SWEEP. NO ADDITIONAL CUTTINGS FROM SWEEP. MUD CUT FROM 10.7 PPG TO 9.1 PPG ON BOTTOMS UP. POH. TIGHT HOLE F/7586'-7382'. INTERMITTENT DRAG 80-100K. REAM UP AND DOWN F/7382'-7586' UNTIL HOLE IS FREE. PULL UP TO 7382' W/ 25-45K DRAG. RIH TO 9036'. NO FILL. CIRCULATE HOLE CLEAN. POH. 15-25K DRAG. HAD A FEW PULLS OF UP TO 50K THROUGH PREVIOUS TIGHT SPOT. CUT OFF 7" CASING MW:10.7 VIS: 42 FINISH POH. L/D BHA. R/U TO RUN 7" CASING. RAN 7" CASING TO 9026'. CIRCULATED 120 BBLS @ 4059' AND 190 BBLS @ 6883'. CIRC AND CONDITION MUD @ 9026'. PUMPED 796 BBLS @ 6.5 BPM. R/U HOWCO. PUMPED 50 BBL ARCO PREFLUSH W/ 2% KCL FOLLWED BY 50 BBL ARCO SPACER W/ 2% KCL. PUMPED 50 SX PREM G LEAD CEMENT (44 BBL). PUMPED 480 SX PREM G TAIL CEMENT (105 BBL). BUMPED PLUG W/ 3000 PSI. HAD GOOD RETURNS WHILE CIRCULATING AND CEMENTING. WORKED PIPE 15-20' UNTIL 255 BBL PUMPED. HAD PROBLEMS LOWERING PIPE AT THAT TIME AND RECIPROCATION WAS STOPPED. FLOATS LEAKING BACK SLIGHTLY. SHUT IN CEMENT HEAD W/ 100 PSI ON CASING. INJECT 30 BBL MUD DOWN 7"X9-5/8" ANNIILUS. LIFT BOP STACK AND SET 7" CASING SLIPS W/ 130K CASING WT. MAKE ROUGH CUT ON 7" CASING. RIG RELEASED MW:10.7 VIS: 42 L/D 7" LANDING JT & CUT OFF. N/D 13-5/8" BOP STACK. SET OUT 20" DIVERTER. INSTALL 11",3MX7-1/16", 5M WKM TUBING SPOOL, EQUIPED WITH WKM 7-1/16", 5M X 3-1/8" LOWER TREE SEAL FLANGE AND 3-1/8", 5M VALVE. TESTED SEALS TO 3000 PSI. FREEZE PROTECT THE 7' X 9-5/8" ANNULUS W/ 60 BBLS DIESEL, FINAL INJECTION PRESSURE 1100 PSI @ 3 BPM. SECURED WELL. R/U AND L/D 5" DP IN MOUSE HOLE. WORK ON SKATE. CONTINUE TO L/D DP, HWDP, AND 1 STD DC. RIG RELEASED @ 0300 HRS 5/16/92. WELL : 3R-19 OPERATION: RIG : NORDIC 1 PAGE: 4 07/21/92 (14) TD: 9036 PB: 8936 07/22/92 (15) TD: 9036 PB: 8936 07/23/92 (16) TD: 9036 PB: 8936 Q7/24/92 (17) TD: 9036 ?B: 8936 07/25/92 (18) TD: 9036 PB: 8936 POOH W/3-1/2" DP MW: 0.0 NaCl/Br MVE RIG F/3R-15 TO 3R-19. ACCEPT RIG @ 08:30 HRS 7/20/92. N/U 7-1/16" FULL OPENING VALVE & BOPE. FUNCTION TST BOPE, PRESSURE TST RAMS, RIG MANIFOLD,& CHOKE MANIFOLD TO 4800 PSI. PRESS TST ANN TO 3000 PSI, HAD TO CHANGE OUT QUICK COUPLER ON ANNULAR SIDE OF RIG MANIFOLD. PULLED THE TST PLUG, SET WEAR BUSHING & DUG MOUSE HOLE. M/U 6-1/8" BIT, SCRAPER, BS, DC'S. SLIPPED & CUT DRLG LINE. RIH W/3-1/2" 15.5# IF DP- 8610' (TAGGED). RAMED F/8610'-8925' HITTING INTERMITTENT STRINGERS. BLEW DOWN KELLY & STOOD BACK SAME. PRESS UP & TST 7" CSG TO 5000 PSI FOR 30 MIN-OK. POOH W/3-1/2" DP @ RPT TIME. P/U 3-1/2" HYDRILL TBG MW:10.4 NaCl/Br FIN POOH W/3-1/2" DP. TST 7-1/8"FLOCON FULL BORE FRAC VALVE TO 3000 PSI. LOAD PIPE SHED W/3-1/2" PH-6 TBG. RE-INSTALL PROTECTORS ON TBG. R/U VARSOL THREAD CLEANING MACHINE. M/U BAKER SOS(PINNED @ 4600 PSI) ON BTM JT OF 3-1/2" PH-6 TBG & P/U. RIH W/PH-6 TBG. (200 JTS IN HOLE @ 0600) PREP TO P/U TCP MW:10.4 NaCl/Br CONT P/U 3-1/2" PH-6 TBG, CLEAN & INSPECT THREADS. R/D TBG TOOLS & THREAD CLEANER. PRESS TST STD PIPE, KELLY HOSE, KELLY & UPPER KELLY COCK. CIRC 70 BBLS BRINE THRU TBG FOLLOWED BY 50 BBLS SAND SCOUT PILL FOLLOWED BY 75 BBLS VISCOUS SWEEP. CIRC PILLS OUT OF HOLE & CIRC HOLE TO CLEAN OUT SAND. DISPLACE BRINE IN WELL TO CLEAN BRINE. BLOW DOWN & STD BACK KELLY. DROP SHEAR OUT BALL & PMP DOWN ON SOS. TEST TBG TO 3000 PSI F/15 MIN. REVERSE CIRC BALL UP TBG & RECOVER SAME. POOH W/3-1/2" TBG. L/D 16 JTS. POOH. MONITORING WELL MW:10.4 NaCl/Br M/U BHA. RIH W/5.5" PH-6 12.95# N-80 TBG. BOP DRILL; CONT RIH W/3.5" TBG. TAG BTM TO 8919'-TOTAL OF 262 JTS. P/U SWS E-LINE, SPACE OUT TOP OF TBG W/15 PUP JT. SET 14' TO 8919'. RIH W/GR & NOISE DETECTION TOOL ON E-LINE. ORIENT GUNS & TIE IN W/RA MARKERS. POOH & L/D TOOLS. R/U DOWELL N2 UNIT & TEST LINES TO 7500 PSI. DISPLACE 35 BBLS BRINE IN TBG W/N2. CLOSE RAMS & BEGIN PRESS TBG. TBG PRESS 4100 PSI. ANNULAR PRESS 2250 WHAN GUNS FIRED. MONITORED WELL F/30 MIN. KEEP ANNULUS FULL W/BRINE. BULLHEADED 65 BBLS DOWN TBG TO DISPLACE N2 INTO FORMATION. CIRC B/U. SHUT IN WELL & MONITORED F/ANOTHER 30 MIN. RIH W/3-1/2" DP F/CLEAN OUT MW:10.4 NaCl/Br SHUT-IN & MONITORED WELL. DISPLACED BRINE DOWN TBG. FILLED HOLE W/10.3 BRINE. POOH W/3-1/2" PH-6 TBG. POOH & L/D PERF GUNS-ASF. PERF INTERVAL F/8420'-8920'. M/U 6-1/8" BIT. RIH W/3-1/2" DP. RECEIVED WELL : 3R-19 OPERATION: RIG : NORDIC 1 PAGE: 5 07/26/92 (19) TD: 9036 PB: 8936 07/28/92 (20) TD: 9036 PB: 8936 07/29/92 (21) TD: 9036 PB: 8936 07/30/92 (22) TD: 9036 PB: 8936 07/27/92 (23) TD: 9036 PB: 8936 07/31/92 (24) TD: 9036 PB: 8936 RIG RELEASED MW:10.4 NaCl/Br CONT RIH W/DP. TAGGED PBTD @ 8924'. CLEANED PITS. REVERSE CIRC & DISPLACE WELL W/ BRINE. POOH. PULL WEAR BUSHINGS. N/D BOP STACK. N/U SECOND 7" VALVE IN PREP FOR FRAC. SECURE WELL. RIG RELEASED @ 20:30 HRS ON 07/25/92. WATER BACK BRINE-CIR MW:10.4 NaCl/Br MVE F/3R-10A-3R-19. RIG ACCEPTED @ 19:30 HRS 07/27/92. WELL ON VACUUM. LAND TST PLUG. N/D BOTH 7" FRAC VALVES. N/U BOP & CHANGE PIPE RAMS. INSTALL FLOW NIPPLE. PRESS TST BOP.INSTALL WEAR BUSHING. M/U 6-1/8" BIT. RIH W/DP. KEPT HOLE FULL W/10/.2+ & 10.1+ BRINE. WATERED BACK BRINE TO 10.0F/10.2+ PPG. R/U TO CIRC. CIRC HOLE CLEAN @ 8837' MW:10.0 NaC1/Br WATERED BACK BRINE TO 10.0 PPG. TRY TO CIRC, NO RETURNS. RIH. SHUT-IN & MONITORED WELL WHILE WAITING ON THIKSAL PILL-VISC SURF BRINE. TAG SAND FILL @ 8706'. PMP 50 BBL THIKSAL LOST CIRC PILL & SPOT WITH 40 BBL VISC BRINE. RECEIVED RETURNS SHORTLY AFTER PILL COVERED PERFS. POOH ABOVE PILL. WASHED & REAMED TO 8746'-N0 BRIDGES. CIRC OUT. POOH ABOVE PERFS. WASHED & REAMED F/8386'-8746'. CIRC. WASHED & REAMED TO 8837'. CIRC HOLE CLEAN. SECURE WL IN SIDE ENTRY SUB MW:10.2 NaCl/Br FIN CBU @ 8837'. WASHED & REAM TO 8936' (PBTD). CIRC HOLE WHILE RECIP & ROTATING DP-STILL GETTING SOME FRAC SAND. SHORTRIP. PUMP 45 BBL THIKSAL SWEEP & CIRC. RECIP & ROTATE PIPE-HOLE CLEAN BUT STILL GETTING SMALL AMT OF FRAC SAND. POOH W/BIT. M/U HLS RA TRACER LOGGING TOOLS. RIH TO 4215' (KOP). SET WL OVERSHOT/LATCH ASSY THRU SIDEDOOR ENTRY SUB IN DP. RIH W/ WL, PUMP DOWN & LATCH WL TO LOGGING TOOLS. FRAC MW:10.2 NaCl/Br R/U DOWELL. BEGIN FRAC @ 10:00 HRS 07/26/92. FRAC PER PROCEDURE IN 13 STAGES. ZONE: A1 SAND PERFS: 8420'-8920'. CIRC B/U MW:10.2 NaC1/Br RIH W/ HLS TRACER LOG ON DP. TIED INTO CET. LOGS SHOWED SOME INCREASE IN TRACER BELOW 8700', APPEARS MOST TRACER WENT IN SMALL INTERVAL F/8860'-8864'. POOH. BREAK OUT SIDE ENTRY SUB AND PULL WL OUT OF DP. RD HLS WL. FIN POOH W/DP. LD HLS RA TRACER LOGGING TOOLS. MU BIT. RIH. BREAK CIRC & TAG PBTD @ 8924' (NORDIC RKB). CIRC BU. WELL : 3R-19 OPERATION: RIG : NORDIC 1 PAGE: 6 08/01/92 (25) TD: 9036 PB: 8936 08/02/92 (26) TD: 9036 PB: 8936 08/03/92 (27) TD: 9036 PB: 8936 08/04/92(28) TD: 9036 PB: 8936 POOH W/ SWS GUNS ON DP MW:10.2 NaC1/Br FIN CBU. POOH W/BHA#2. M/U & RIH W/SWS PERF ASSY W/ ORIENTATION DETECTOR-2 SPF, 180 DEGREE, 24 GM BIG HOLE CHARGES. R/U SWS WL. RIH W/GR/CCL & NOISE LOG TO TIE IN. TIE INTO RA SUBS & CDR LOG OF 5/14/92. ORIENT GUNS. PRESS DP TO 1850 PSI TO ACTIVATE FIRING HEAD. CHECK FOR FLOW-NO FLOW. OPEN RAMS & FILL ANN W/ 8BBLS. PRESS DP & OPEN CIRC VALVE @ 2700 PSI. GUNS PERFORATED F/7900'-8370'. (FL=8BBL). CIRC ONCE AROUND. MONITOR WELL, LOSING FLUID SLOWLY. POOH. PREP TO SET PKR & FISH SM MW:10.2 NaCl/Br FIN POOH. L/D DP & PERF GUNS-ASF. R/U FLOOR TO RUN TBG. RUN 3-1/2" COMPLETION ASSEMBLY. M/U SSSV & TST-OK. CONT RUNNING TBG. WORKED PIPE-HUNG UP. M/U HEAD PIN & BREAK CIRC-WORK PIPE-PACKER HUNG UP. CIRC & REVERSE TO FREE UP-PACKING OFF. L/D TBG-PKR HUNG UP ON 7" CSG COLLAR. JT HUNG UP @ 6487'. DROP BACK DOWN TO 6502' (TAIL DEPTH). DROP BALL & CIRC DOWN TO SOS TO SET PKR. PLAN TO FISH PKR & MAKE CLEAN OUT RUN. RIH W/BHA #3-CLEAN OUT RUN MW:10.2 NaCl/Br CIRC, PRESS TBG, & SET PKR. PKR SET @ 6459'-TBG TAIL @ 6502'. POOH. L/D SSSV. R/U TO RUN DP. SET WB. M/U BAKER RETRIEVING TOOL & JARS. RIH. M/U KELLY. BREAK CIRC & CIRC ABOVE PKR FOR 15 MIN. ROTATE & RELEASE PKR. P/U ON PKR-HUNG UP IN 7" CASING COLLAR AS BEFORE SETTING PKR. BUMP DOWN & WORK PIPE-WORKS FREELY. RETREIVE PKR. POOH. M/U BIT & BHA #3. RIH W/BHA #3 FOR CLEANOUT. CIRC PKR SETTING BALLT/SOS MW:10.2 NaCl/Br CONT RIH W/BHA #3. RIH-PU DP WORKING SCRAPER WITH EACH JT BELOW 7900'. TAG SOFT FILL @ 8873. PU KELLY. DREAK CIR. SERVICE KELLY. REAM & WASH OUT SOFT FILL F/8873'-8924'. CIRC HOLE CLEAN. RECIP & ROTATE PIPE THROUGHOUT. POOH. REVERSE OUT & CATCH DRY JOB. MU KELLY. ROTATE & RECIP PIPE F/7527-7567' CIRC HOLE CLEAN. POOH. PULL WB. RU TO RUN TBG. RUN ~-1/2" SINGLE COMPLETION ASSY. MU NEW SOS ON TAILPIPE. MU NEW PBR/HB PKR ASSY. RERUN 3-1/2" TBG (9.3# J-55) BTM OF TBG TAIL @ 7579' BAKER HB RETR PKR SET @ 7550' TRDP-4A MOD SSSV SET @ ~796' BREAK CIRC & f · CIRC PKR SETTING BALL DOWN TO SOS. RECEIVED S E P - 4' 1992 Alaska Oil & 6as Cons. Corrlmissior ,nchorage WELL : 3R-19 OPERATION: RIG : NORDIC 1 PAGE: 7 08/05/92 (29) TD: 9036 PB: 8936 RIG RELEASED MW: 0.0 Diesel CONT CIRC TO SET BALL IN SOS. SET PKR(2500-3000 PSI). SHEAR PKR. SHUT IN & PRESS UP TBG & ANN TO TEST PKR-TEST GOOD. BLEED DOWN ANN TO CLOSE CIRC VALVE-DID NOT CLOSE. PRESS ANN & TBG TO 1000 PSI-CLOSE SSSV-BLEED OFF TBG. TEST SSSV-TEST GOOD. REOPEN SSSV. CIRC, REVERSE CIRC-CHECK NOT CLOSING. PRESS UP TBG & ANN-PRESSURE FELL TO 0 PSI. (FAULTY CIRC VALVE). LDLT. SET BPV. ND BOPE. NU WKM GEN IV TREE. TEST PACKOFF, TREE. PULL TP. RU PUMP LINES. DISPLACE WELL TO DIESEL. RU CAMCO SLICKLINE. RIH & RETRIEVE CIRC VALVE. REPLACE W/DUMMY VALVE. PRESS ANN T/2500 PSI TO TEST TBG & PACKER-TEST GOOD. RD CAMCO SLICKLINE. SECURE WELL. RELEASE RIG @ 04:00 8/5/92. MOVING TO 3R-20. SIGNATURE: ( dr~e rint ende~t ) DATE: I I I ORIGINAL' lCTtOl:lLl4 SUB - S URFA CE DIRECTIONAL SURVEY r~ UIDANCE ONTINUOUS F~ OOL RECEIVED JUN 2 9 1992 Alaska 0ii & Gas Cons. Commission Anchorage Company ARCO ALASKA, INC. Well Name 3R-19 (1991.'FNL~2..443'FWL~SEC 9~T13N,R9E~UMI Field/LocationKuPARUK RIVER~ NORTH SLOPE~ ALASKA Job Reference No. 92332 Loqqed Bv: T. WEST Date 24-MAY- 1992 Computed By: R. SINES * SCHLLI~BEROF_R · GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE' 24-MAY-1992 ENGINEER' T. WEST METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- Averaged deviation and azimuth INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 13 DEG 51MIN WEST COMPUTATION DATE' lO-JUN-92 ' PAGE I ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SLJRVEY' 24-MAY-1992 KELLY BUSHING ELEVATION' 52.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 1OO FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 O0 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 599 99 699 99 799 99 899 99 -52.00 0 0 N 0 0 E 48.00 0 10 S 27 3 W 148.00 0 12 S 31 22 W 248.00 0 17 S 30 I W 348.00 0 16 S 27 49 W 448.00 0 17 S 37 21 W 547.99 0 22 S 42 23 W 647.99 0 27 S 46 6 W 747.99 0 26 S 53 22 W 847'. 99 0 27 S 57 53 W 0 O0 0 19 0 50 0 88 I 30 I 73 2 27 2 94 3 59 4 17, O. O0 0. O0 O. O0 O. 04 0. O0 0.19 0.21 O. 33 0.17 O. 23 0.00 N 0 17 S 046S 0 79 S I 18S 156 S 2 02S 2 57 S 3 lOS 3 535 O00E 0 09 W 026W 046W 0 66W 0 90W I 30W I 84W 244W 3 11W 0 O0 N 0 0 E 2O S 28 38 W 53 S 29 50 W 91 S 29 56 W 35 S 29 12 W 80 S 30 5 W 40 S 32 39 W 16 S 35 32 W 95 S 38 12 W 71 S 41 25 W 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 999 98 O0 1099 O0 1199 O0 1299 O0 1399 O0 1499 O0 1599 O0 1699 O0 1799 O0 1899 947 98 97 1047 97 96 1147 96 95 1247 95 93 1347 93 92 1447 92 91 1547 91 91 1647 91 90 1747 90 90 1847 90 0 36 S 60 I W 0 51 S 61 28 W 0 56 S 66 24 W 0 57 S 64 68 W 0 59 S 65 36 W 0 49 S 69 11 W 0 39 S 81 10 W 0 29 S 89 56 W 0 27 N 86 57 W 0 24 N 86 36 W 4.84 5.75 6.74 7.75 8.83 9.82 10.41 10,69 10.85 10.99 O. 32 O. 52 0.23 0.27 0. O0 0.38 O. 72 O. O0 O. O0 O. 05 4 O1 S 4 68 S 5 345 6 02 S 6745 7 39 S 770S 7 75 S 7 72 S 7 685 3 92W 5 07 W 6 48W 7 99W 9 53W 11 04 W 12 27 W 13 23 W 14 03 W 14 78 W 5 61 S 44 21W 6 8 10 11 13 14 15 16 16 90 S 47 20 W 39 S 5O 29 W O0 S 53 I W 67 S 54 43 W 28 S 56 12 W 48 S 57 54 W 34 S 59 39 W 01 S 61 11W 66 S 62 33 W 2000.00 1999 90 1947 90 2100.00 2099 2200.00 2199 2300.00 2299 2400.00 2399 2500.00 2499 2600.00 2599 2700.00 2699 2800.00 2799 2900.00 2899 89 2047 89 89 2147 89 89 2247 89 89 2347 89 88 2447 88 88 2547 88 88 2647 88 87 2747 87 87 2847 87 0 25 N 88 34 W 0 23 S 82 I W 0 21 S 84 36 W 0 23 N 89 34 W 0 26 N 88 21 W 0 28 N 84 17 W 0 28 S 89 16 W 0 30 S 88 22 W 0 31 S 87 2 W 0 31 S 84 18 W 11.13 11.36 11.59 11.77 11.92 12.04 12.21 12.42 12.67 12.96 0 O0 0 O0 0 O0 0 O0 0 13 0 03 0 21 0 O0 0 O0 0 11 7 655 771 S 7 78 S 7 81 S 7 78S 7 73 S 7 70S 7 71S 7 76 S 7 835 15 5O W 16 20 W 16 84 W 17 60 W 18 22 W 18 9,5 W 19 79 W 20 61 W 21 49 W 22 39 W 17 29 S 63 45 W 17 18 19 19 20 21 22 22 23 94 S 64 33 W 55 S 65 12 W 16 S 65 57 W 81 S 66 52 W 47 S 67 49 W 24 S 68 45 W 01 S 69 29 W 84 S 70 9 W 72 S 70 44 W 3000 O0 2999 87 2947 87 3100 3200 3300 3400 3500 3600 3700 3800 3900 O0 3099 O0 3199 O0 3299 O0 3399 O0 3499 O0 3599 O0 3699 O0 3799 O0 3899 86 3047 86 3147 86 3247 85 3347 83 3447 82 3547 80 3647 78 3747 74 3847 0 31 S 79 43 W 86 0 30 S 73 15 W 86 0 19 S 66 6 W 86 0 7 S 31 19 W 85 I 0 S 45 46 E 83 I 10 S 60 40 E 82 0 57 S 71 31E 80 I 4 *S 76 22 E 78 I 27 S 62 59 E 74 I 32 S 57 34 E 13 30 13 71 14 12 14 40 14 90 15 62 15 92 15 99 16 12 16 89 0 O0 0 32 0 23 0 08 I 23 0 O0 0 17 0 O0 I O8 0 78 7 96S 8 17 S 841S 8 615 9 225 10 38 S 11 08 S 11 56 S 12 18 S 13 55 S 23 30 W 24 15 W 24 88 W 25 22 W 24 86 W 23 18 W 21 58 W 19 90 W 17 96 W 15 62 W 24 63 S 71 9 W 25 26 26 26 25 24 23 21 20 49 S 71 19 W 26 S 71 20 W 65 S 71 8 W 51 S 69 39 W 40 S 65 53 W 26 S 62 50 W 01 S 59 51W 70 S 55 52 W 68 S 49 4 W COMPUTATION DATE' lO-JUN-92 PAGE 2 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY- 24-MAY-1992 KELLY BUSHING ELEVATION' 52.00 ET INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN O0 4099 O0 4199 O0 4299 O0 4399 O0 4498 O0 4597 O0 4695 O0 4794 O0 4891 72 4047 71 4147 62 4247 20 4347 39 4446 25 4545 85 4643 09 4742 89 4839 0 39 S 63 56 E 72 0 31 N 71 40 E 71 0 51 N 77 5 E 62 3 50 N 75 g E 20 6 20 S 82 3 E 39 8 8 S 75 15 E 25 9 14 S 56 12 E 85 10 9 S 35 22 E og 11 9 S 13 11E 89 13 30 S I 44 W ENGINEER- T. WEST 4000 O0 3999 72 3947 72 4100 4200 4300 4400 4500 4600 4700 4800 4900 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 17 49 17 44 16 93 14 99 12 64 12 08 14 81 23 O0 37 69 57 47 0 63 0 52 I 45 2 60 I 95 1 89 2 19 5 O0 4 80 4 lg 14 57 S 14 73 S 14 47 S 13 39 S 13 19 S 15 68 S 21 84 S 33 25 S 50 21 S 70 92 S 13 99 W 13 10 W 12 04 W 832W 0 70 E 13 10 E 26 73 E 38 79 E 46 24 E 47 54 E 20 20 S 43 50 W 19 18 15 13 20 34 51 68 85 71 S 41 38 W 82 S 39 46 W 76 S 31 52 W 21 S 3 3 E 43 S 39 53 E 52 S 5O 45 E 09 S 49 24 E 26 S 42 38 E 38 S 33 50 E 5000 O0 4988 27 4936 27 17 20 5100 O0 5082 5200 O0 5175 5300 O0 5267 5400 O0 5357 5500 O0 5444 5600 O0 5529 5700 O0 5611 5800.00 5690 5900.00 5764 87 5030 83 5123 52 5215 52 5305 72 5392 08 5477 14 5559 04 5638 19 5712 87 20 30 83 22 34 52 24 30 52 27 28 72 31 2 08 33 44 14 36 4 04 39 53 19 44 14 S 3 g W S 324W S 4 31 W S g 54W S 14 13 W S 1542 W S 17 23 W S 17 41 W S 17 3 W S 16 19 W 83 58 115 39 151 66 191 25 234 78 283 67 337 30 394 30 455 59 522 55 3 38 3 02 2 O6 3 37 3 85 3 15 2 12 2 93 4 39 4 18 97 49 S 129 80 S 166 56 S 206 16 S 248 69 S 295 92 S 347 40 S 401 81S 460 46 S 524 65 S 46 25 E 107.90 S 25 23 E 44 44 E 137.20 S 18 54 E 42 03 E 171.78 S 14 10 E 37 25 E 209.49 S 10 14 E 27 94 E 250.26 S 6 25 E 15 23 E 296.31 S 2 57 E 0 O0 W 347.40 S 0 0 W 17.41W 402.19 S 2 29 W 35.59 W 461.83 S 4 25 W 54.98 W 527.52 S 5 59 W 6000.00 5833 14 5781 14 48 40 6100.00 5896 6200.00 5954 6300.00 6009 6400.00 6065 6500.00 6119 6600.00 6174 6700.00 6229 6800.00 6280 6900.00 6325 37 5844 69 5902 84 5957 02 6013 98 6067 30 6122 07 6177 53 6228 68 6273 S 15 47 W 37 52 36 S 15 1 W 672 69 55 53 S 16 9 W 753 84 56 40 S 16 46 W 836 02 56 24 S 17 4 W 920 98 57 17 S 17 45 W 1003 30 56 21 S 15 50 W 1087 07 57 57 S 15 30 W 1170 53 60 57 S 15 38 W 1256 68 64 54 S 15 4 W 1345 594 90 30 48 80 08 46 29 91 60 77 4 74 3 64 3 24 0 20 0 64 1 65 I 93 2 04 5 73 2 28 594 25 S 668 747 827 906 986 1066 1147 1230 1316 74.87 W 598 95 S 7 11W 90 S 95.47 W 675 18 S 117.06 W 756 12 S 140.89 W 839 93 S 165.10 W 921 65 S 190.06 W 1004 95 S 214.55 W 1088 52 S 237.08 W 1171 13 S 260.01W 1257 18 S 283.47 W 1346 67 S 8 7 W 30 S 8 54 W O3 S 9 40 W 83 S 10 19 W 79 S 10 54 W 31 S 11 22 W 76 S 11 40 W 31 S 11 56 W 36 S 12 9 W 7000 O0 6367.69 6315 69 65 1 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 6410.25 6358 O0 6454.19 6402 O0 5497.06 6445 O0 6537.65 6485 O0 6574.25 6522 O0 6608.50 6556 O0 6630.92 6578 O0 6644.20 6592 O0 6655.46 6603 25 64 37 19 63 31 06 65 12 65 67 17 25 68 50 5O 72 21 92 80 44 20 83 3 46 84 47 S 15 0 W 1436 50 S 14 58 W 1526 S 14 52 W 1616 S 13 38 W 1707 S 13 26 W 1798 S 13 47 W 1891 S 14 34 W 1985 S 17 38 W 2082 S 16 55 W 2181 S 16 o W 2280 98 79 12 50 56 48 69 58 83 0 49 0 63 1 15 1 51 4 65 1 03 2 O0 8 47 3 89 4 10 1403 81 S 307.04 W 1437 O0 S 12 20 W 1491 1578 1665 1754 1844 1935 2029 2123 2218 24 S 330 39 W 1527 06 S 353 58 S 375 46 S 397 87 S 419 99 S 441 23 S 469 70 S 499 95 S 528 45 W 1617 82 W 1707 07 W 1798 14 W 1891 90 W 1985 82 W 2082 76 W 2181 O0 W 2280 41 S 12 30 W 16 S 12 37 W 46 S 12 43 W 83 S 12 45 W 88 S 12 48 W 78 S 12 51W 91 S 13 2 W 71 S 13 15 W 91 S 13 23 W COMPUTATION DATE: lO-JUN-92 PAGE 3 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 24-MAY-1992 KELLY BUSHING ELEVATION: 52.00 F-I' ENGINEER: T. WEST INTEEPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 6660 49 6608,49 90 50 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 6656 O0 6653 O0 6653 O0 6653 O0 6652 O0 6652 O0 6651 O0 6651 O0 6649 89 6604 89 92 27 46 6601 14 6601 04 6601 64 6600 05 6600 59 6599 03 6599 01 6597 46 91 7 14 89 49 04 90 10 64 90 17 05 90 24 59 90 15 03 90 38 01 91 31 S 15 53 W 2380 59 S 15 10 W 2480 S 15 11W 2580 S 15 12 W 2680 S I4 23'W 2780 S 14 39 W 2880 S 15 3 W 2980 S 14 58 W 3080 S 14 29 W 3180 S 14 7 W 3280 46 37 35 33 32 31 28 26 24 8 61 2 54 2 42 3 18 I 10 I 71 2 78 I 05 I 38 2 09 2314.99 S 555 20 W 2380 64 S 13 29 W 2411 14 S 582 2507 2604 2700 2797 2894 2991 3087 3184 61S 608 26 S 634 91S 659 77 S 684 47 S 710 O0 S 735 68 S 761 54 S 786 41W 2480 53 W 2580 16 W 2680 82 W 2780 69 W 288O 13 W 2980 23 W 3080 77 W 3180 54 W 3280 49 S 13 35 W 39 S 13 38 W 36 S 13 41W 34 S 13 44 W 33 S 13 45 W 31 S 13 47 W 28 S 13 50 W 26 S 13 52 W 24 S 13 52 W 9000.00 6646.82 6594.82 91 10 S 14 14 W 3380.21 9036.00 6646.08 6594.08 91 10 S 14 14 W 3416.20 O. O0 O. O0 3281.36 S 811.45 W 3380.21 S 13 53 W 3316.25 S 820.29 W 3416.20 S 13 54 W COMPUTATION DATE: lO-JUN-92 PAGE 4 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 24-MAY-1992 KELLY BLISHING ELEVATION: 52.00 Iq' INTEEPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TEUE SUB-SEA COURSE MEASURED YERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0 O0 0 O0 98 947 90 1947 87 2947 72 3947 27 4936 14 5781 -52 O0 0 0 98 0 36 90 0 25 87 0 31 72 0 39 27 17 20 14 48 40 ENGINF_F_I~: T. WEST 1000 2000 3000 4000 5000 6000 7000 8000 9000 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN O0 999 O0 1999 O0 2999 O0 3999 O0 4988 O0 5833 N 0 0 E S 60 I W 4 N 88 34 W 11 S 79 43 W 13 S 63 56 E 17 S 3 9 W 83 S 15 47 W 594 S 15 0 W 1436 S 15 53 W 2380 S 14 14 W 3380 O0 6367 O0 6660 O0 6646 69 6315 49 6608 82 6594 69 65 1 49 90 50 82 91 10 0 O0 84 13 3O 49 58 90 50 59 21 0 O0 0 32 0 O0 0 O0 0 63 3 38 4 74 0 49 8 61 0 O0 0.00 N 4 01S 7 7 14 97 594 1403 2314 3281 3 65 S 15 96 S 23 57 S 13 49 S 46 25 S 74 81S 307 99 S 555 36 S 811 0 O0 E 92 W 5 50 W 17 30 W 24 99 W 20 25 E 107 87 W 598 04 W 1437 20 W 2380 45 W 3380 0 O0 N 0 0 E 61 S 44 21W 29 S 63 45 W 63 S 71 9 W 20 S 43 5O W 90 S 25 23 E 95 S 7 11W O0 S 12 20 W 64 S 13 29 W 21 $ 13 53 W 9036.00 6646.08 6594.08 91 10 S 14 14 W 3416.20 0.00 3316.25 S 820.29 W 341L, 20 S 13 54 W ARCO ALASKA, INC. 32 - 19 KUPARUK RIVER NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG ~IN DEG ~IN 0 O0 52 O0 152 O0 252 O0 352 O0 452 O0 552 O0 652 01 752 01 852 O1 0 O0 52 O0 152 O0 252 O0 352 O0 452 O0 552 O0 652 O0 752 O0 852 O0 COMPUTATION DATE: lO-JUN-92 ' PAGE 5 DATE OF SURVEY: 24-MAY-1992 KELLY BUSHING ELEVATION: 52.00 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL .DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH 952 02 1052 1152 1252 1352 1452 1552 1652 1752 1852 -52.00 0 0 N 0 0 E 0.00 0 6 S 37 15 W 100.00 0 12 S 31 35 W 200.00 0 13 S 29 49 W 300.00 0 15 S 26 46 W 400.00 0 16 S 34 0 W 500.00 0 21 S 40 3 W 600.00 0 27 S 44 17 W 700.00 0 27 S 47 25 W 800.00 0 29 S 58 32 W 900 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 33 S 59 12 W 0 48 S 60 44 W 0 54 S 64 53 W 0 58 S 65 47 W 058 S64 8W 0 58 S 66 45 W 0 44 S 77 57 W 0 33 S 87 45 W 0 27 N 87 49 W 0 26 N 87 19 W 952.00 02 1052 O0 1000 03 1152 O0 1100 05 1252 O0 1200 06 1352 O0 1300 08 1452 O0 1400 09 1552 O0 1500 09 1652.00 1600 10 1752.00 1700 10 1852.00 1800 1952 10 1952.00 1900 O0 10 2052.00 2000 11 2152.00 2100 11 2252.00 2200 11 2352.00 2300 11 2452.00 2400 12 2552.00 2500 12 2652.00 2600 12 2752.00 2700 13 2852.00 2800 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 25 N 87 18 W 0 24 S 82 44 W 0 23 S 83 33 W 0 23 S 87 52 W 0 25 N 87 43 W 0 25 N 84 58 W 0 28 N 88 27 W 0 27 S 88 20 W 0 31 S 87 8W 0 32 S 85 13 W 2052 2152 2252 2352 2452 2552 2652 2752 2852 2952 13 2952 O0 2900.00 14 3052 14 3152 14 3252 14 3352 16 3452 18 3552 19 3652 21 3752 24 3852 O0 3000 O0 O0 3100 O0 O0 3200 O0 O0 3300 O0 O0 3400 O0 O0 3500 O0 O0 3600 O0 O0 3700 O0 O0 3800 O0 0 33 S 81 58 W 0 30 S 75 51W 0 27 S 71 24 W 0 13 S 58 3 W 0 21 S 22 48 E I 12 S 56 47 E 0 57 S 68 11E I I S 74 7 E 1 8 S 73 55 E 1 35 S 59 7 E 3052 3152 3252 3352 3452 3552 3652 3752 3852 FEET DEG/IO0 FEET FEET FEET DEG MIN '0 O0 0 O8 0 34 0 68 I 10 I 52 2 O0 2 61 3 29 3 9O 0 O0 0 65 0 O0 0 O0 0 O0 0 O0 0 21 0 12 0 O0 0 O6 0.00 N 0.00 E 0.07 S 0.04 W 0 0.31 S O. 17 W 0 0.61 S 0.35 W 0 1.00 S 0.57 W 1 1.37 S 0.77 W 1 1.79 S 1.09 W 2 2.30 S 1.56 W 2 2.86 S 2.15' W 3 3.32 S 2.79 W 4 000 N 0 0 E 08 S 27 13 W 35 S 28 40 W 71 S 29 51W 15 S 29 41W 58 S 29 22 W 10 S 31 24 W 78 S 34 10 W 58 S 36 59 W 34 S 40 I W 4.50 5.26 6.26 7.25 8.31 9.38 10.17 10.58 10.78 10.93 11.06 11.24 11.49 11.69 11.85 11.99 12.12 12.32 12.55 12.82 13 13 13 51 13 94 14 28 14 57 15 33 15 84 15 97 15 98 16 49 0 22 0 65 0 O0 0 14 0 18 0 16 0 39 0 O0 0 O0 0 O0 O. O0 0. O0 O. O0 O. O0 O. O0 0. O0 O. 03 0. O0 0. O0 O. O0 0. O0 0 O0 0 O0 0 17 I 07 0 31 0 31 0 18 0 79 0 13 3.77 S 4.32 S 5 02S 5 68S 6 39 S 7 11 S 7 59 S 7 74S 7 74S 7 70S 7 66S 7 665 7 755 7815 7 805 7 765 7 70S 7715 7 73S 7 795 789S 8055 8 305 852S 8 795 9 86S 10 81 S 11 33 S 11 79 S 12 86 S 350W 447 W 5 79W 727W 879W 10 34 W 11 69 W 12 79 W 13 66 W 14 43 W 15 16 W 15 88 W 16 55 W 17 17 W 17 86 W 18 60 W 19 40 W 20 22 W 21 O7 W 21 95 W 22 87 W 23 75 W 24 58 W 25 11W 25 21W 24 03 W 22 32 W 20 74 W 18 95 W 16 74 W 5 14 S 42 56 W 6 7 9 10 12 13 14 15 16 21 S 45 57 W 66 S 49 3 W 22 S 51 59 W 87 S 53 58 W 55 S 55 30 W 94 S 56 59 W 95 S 58 49 W 70 S 60 28 W 35 S 61 55 W 16 98 S 63 11W 17 18 18 19 20 2O 21 22 23 63 S 64 14 W 27 S 64 53 W 86 S 65 33 W 49 S 66 25 W 16 S 67 22 W 87 S 68 21W 64 S 69 8 W 44 S 69 51W 29 S 70 28 W 24 19 S 70 58 W 25 25 26 26 25 24 23 22 21 08 S 71 16 W 94 S 71 21W 51 S 71 16 W 70 S 70 46 W 98 S 67 41W 80 S 64 10 W 63 S 61 21W 32 S 58 7 W 11 S 52 28 W COMPUTATION DATE' lO-JUN-92 PAGE 6 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY' 24-MAY-1992 KELLY BUSHING ELEVATION- 52.00 FT ENGINEER' T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE WEASURED VERTICAL VERTICAL DEVIATION AZIWUTH DEPTH DEPTH DEPTH DEG WIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIDEJ'rH FEET DEG/IO0 FEET ,FEET FEET DEG MIN 3952 27 3952 O0 3900 O0 4052 4152 4252 4352 4453 4554 4655 4757 4859 28 4052 28 4152 30 4252 54 4352 17 4452 19 4552 49 4652 O0 4000 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 I 6 S 57 0 E O0 0 32 S 75 54 E O0 0 36 N 74 5 E O0 2 6 N 73 25 E O0 5 24 N 88 50 E O0 7 23 S 78 51E O0 8 40 S 64 51E O0 9 37 S 46 17 E O0 10 53 S 22 30 E O0 12 2 S I 21E 12 4752 09 4852 O0 4700 O0 4800 17 30 17 55 17 17 16 30 13 45 12 21 12 85 18 58 3O 69 48 67 I 10 0 50 0 52 3 92 3 83 2 46 3 53 3 93 3 63 3 83 14.21S 14 75 S 14 58 S 14 13 S 12 83 S 14 28 S 18 3O S 27 47 S 42 40 S 61 87 S 14 61W 13 49 W 12 59 W 10 81W 4 17 W 6 91E 20 54 E 33 83 E 43 77 E 47 61E 20.38 S 45 47 W 19.99 S 42 27 W 19.26 S 40 49 W 17.78 S 37 25 W 13.49 S 18 0 W 15.86 S 25 49 E 27.51 S 48 19 E 43.58 S 50 55 E 60.94 S 45 55 E 78.07 S 37 35 E 4962 15 4952 O0 4900 O0 15 56 5067 5174 5282 5393 5508 5627 5751 5883 6028 17 5052 24 5152 97 5252 79 5352 53 5452 65 5552 13 5652 06 5752 93 5852 O0 5000 O0 5100 O0 5200 O0 5300 O0 5400 O0 5500 O0 5600 O0 5700 O0 5800 O0 19 25 O0 22 7 O0 24 9 O0 27 15 O0 31 17 O0 34 17 O0 37 53 O0 43 33 O0 5O 0 S 3 3 W S 3 16W S 3 55W S 846 W S 14 3W S 15 49 W S 17 45 W S 17 8W S 16 33W S 15 40 W 72 96 104 39 142 O0 184 26 231 93 288 13 352 72 424 98 S10 81 616 81 3 92 3 42 I 97 3 45 3 85 3 13 2 18 3 91 4 16 4 64 86 69 S 118 63 S 156 80 S 199 24 S 245 93 S 300 21S 362 14 S 431 15 S 513 37 S 615 36 S 46 84 E 45 42 38 28 14 4 26 51 80 98 53 S 28 23 E O9 E 126 75 E 162 38 E 202 62 E 247 O1E 300 66 W 362 58 W 431 66 W 515 80 W 620 91 S 20 49 E 52 S 15 15 E 90 S 10 54 E 59 S 6 38 E 54 S 2 4O E 17 S 0 44 W 97 S 3 32 W 96 S 5 45 W 64 S 7 29 W 6195 21 5952.00 5900 O0 55 45 6376 6559 6743 6962 7195 7438 7866 9036 47 6052.00 6000 32 6152.00 6100 56 6252.00 6200 70 6352.00 6300 10 6452.00 6400 50 6552.00 6500 23 6652.00 6600 O0 6646.08 6594 O0 56 25 O0 57 8 O0 58 32 O0 65 13 O0 63 30 O0 68 32 O0 83 34 08 91 10 S 16 3 W S 16 56 W 900 S 16 48 W 1053 S 15 27 W 1207 S 15 4 W 1402 S 14 51W 1612 S 13 46 W 1834 S 15 59 W 2247 S 14 14 W 3416 749 52 51 3O 93 66 40 23 27 2O 3 23 0 25 3 38 2 25 0 62 0 94 I 95 4 79 0 O0 743 37 S 115 96 W 752 36 S 8 52 W 888 1034 1183 1371 1573 1789 2186 3316 18 S 159 30 S 204 22 S 246 13 S 298 82 S 352 19 S 405 66 S 518 25 S 820 37 W 902 98 W 1054 94 W 1208 27 W 1403 33 W 1612 46 W 1834 76 W 2247 29 W 3416 37 S 10 10 W 42 S 11 13 W 71 S 11 47 W 19 S 12 16 W 77 S 12 37 W 55 S 12 46 W 35 S 13 2I W 20 S 13 54 W COMPUTATION DATE: lO-JUN-92 ' PAGE 7 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER BASE KUPARUK A 9 5/8" CASING TOP KUPARUK C LAST READING GCT BASE KUPARUK C TOP KUPARUK A PB'rD LAST READING MWD 7" CASING DATE OF SURVEY: 24-MAY-1992 KELLY BUSHING ELEVATION: 52.00 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 1991' FNL A 2443' FWL, SEC9 T13N RgE UM MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 0 O0 4059 O0 7406 O0 7592 89 7680 O0 7680 O0 8936 O0 8964 38 9023 O0 9036 O0 0 O0 4058 72 6539 95 6606 45 6627 54 6627 6648 6647 6646 6646 54 14 54 08 -52 O0 4006 72 6487 95 6554 45 6575 54 6575 54 6596 14 6595 54 6594 35 6594 08 0 O0 N 14 76 S 1759 85 S 1929 41S 2010 44 S 2010 44 S 3219 38 S 3246 84 S 3303 65 S 3316 25 S 0.00 E 13.43 W 398 36 W 440 15 W 463 88 W 463 88 W 795 55 W 802 70 W 817 10 W 820 29 W COMPUTATION DATE: lO-JUN-92 PAGE 8 ARCO ALASKA, INC. 3R - 19 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER BASE KUPARUK A 9 5/8" CASING TOP KUPARUK C LAST READING GCT BASE KUPARUK C TOP KUPARUK A PBTD LAST READING MWD 7" CASING DATE OF SURVEY: 24-MAY-1992 KELLY BUSHING ELEVATION: 52.00 FT ENGINEER: T. WEST ************ STRATIGRAPHIC SL~ARY ************ SURFACE LOCATION = 1991' FNL & 2443' FWL, SEC9 T13N R9E UM MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 0.00 4059.00 7406.00 7592.89 7680.00 7680.00 8936.00 8964.38 9023.00 9036.00 0.00 4058.72 6539.95 6606.45 6627 54 6627 54 6648 14 6647 54 6646 35 6646 08 -52.00 4006.72 6487.95 6554.45 6575.54 6575.54 6596.14 6595.54 6594.35 6594.08 0 O0 N 14 76 S 1759 85 S 1929 41S 2010 44 S 2010 44 S 3219 38 S 3246 84 S 3303 65 S 3316 25 S 0.00 E 13 43 W 398 36 W 440 15 W 463 88 W 463 88 W 795 55 W 802 70 W 817 10 W 820 29 W FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 9036.00 6646.08 6594.08 3416.20 S 13 54 W DIRECTIONAL SURVEY COMPANY ARCO ALASKA, INC. FIELD KUPARUK RIVER W'=LL 3R - 19 COUNTRY USA RUN ONE DATE LOGGED ~ - MAY - 92 DEPTH UNIT FEET AEFEAENCE 92332 negliginoe Mt our part. be IlaDle (x reepormlMe tM any ~ ooMI, dMItagM Or eX~Mt~I tnMxred or t~lned by anyone reiJi~g from any liYeq)relaUon macle I)y any oW our M~Derl, agen~ or eml)loy14i. Them II~q)retatlml ;1~ MBo 8t~JeM ~) our OenM41 TMml an(I COrNJIliMI M let O(J in our (XJTM~ p/l~e ~tedUl~ WELL' 3R-19 (1991'FNL,2443'FWL,SEC 9,T13N,R9E,UM) HORIZONTAL PROJECTION 1ooo '"i'"i"!" i' '~' ~":' "": ~ ..... , ":'"!'? '~ ...... : '""i '! ............ ~: .... : ....... ~ ~ ..... :'"~'": .... :' r"~"! , ...... ~ : ......................... : :- ...... "': .... :'": ...... :*"~*":"~ .... ~ ~": ........... ~"~ ..... ~'"~ '~' ~ .... ~:' :' :": ......... ~ i-'i ..... ~ .................... ~-'~ ....... ~ ......... !'"i"! ........ ~ ~.- ~--i-.: ...... · ~..i-..i...i ..... i-..i....-i...:.-~....i..i.-i ...... i.-i..?- ...... ~-i.!.'..i ...... i-.i-i-i .... h.-'Li*.~..i-.i...i...~..;-.-.~...i.-~ .... ~./h.lm...'....~-.i ...... L;..i..~ I... i..i .i .... i-.i..i .~ i...i'....i .... ..~. ~?~ ..... i ..... LL!....i: .... !.._i.~. .... i ..... . .... i ........ ....... ~ .................... t .... ! ....... ,x/, ............. Li .............. i_ ........ .. .... '. .... ._iL ...... L~_.i ....... i.L/~i .... .~ ..i.. i...i...~. ~ ...... :~../....i ..... ~...;.. i ....... ~...i .... i ...... ~..i..i...~. ...... ;..~ ..... i ..... i...i..?~l ./~...:...!...i ...... ;...~...;...i ...... i...i...i...i ...... L.;...;...: ..... ~-.i...,~...; ....... ~...i...i..~ .... ~...i/.,..i .... :.. · -i-' !---!.--i.. ?-i--i ! ..... i.-i. !-.: .... i i.-". i i.-!....-~ .... i*.-i-.i..-i .... i*-.i'.!"-i ..... !"-i--:'/', ..... i...i-..i. 'i ...... i-.-i-..i- i ..... i--.i.-.i-..! ...... i-'!"-i..*! i'-.i--'! .-! ...... !..-i.-.!*-i ..... i.-i..i-.i i ! i.-. ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::!:::!:::i:::i::::::!:::!:::i:::!::: :::i:::i:::!:::!:: ::::::::::::::::::::::::::::::::::::: :::i:::i:::i:::i::: :::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: '.'L.i..i...; ...... L.i...i...i ...... i...i....'i ...... i......i., i.. *i...i ..... i...~..L.i ..... i..L.i...i'..I...i...i.//....~...:.*.i...i-..i... ...... i...i...i..i ...... L.i...;..i ..... i...L.i...;..I...i?-....'...i...i...;...: ...... i.i..!..i ..... i: ..!...~ ...... t ................ i..h..:...: ........ i-.-i ..... ...~ ............ i...i ....... i.. ~...;--.~. .....~*iiii'"i .i...i ...... i...:....i...i ..... i ..:,...i.. i ...... i.-.:* ...... z ..... i ..i..~. ..:.. t...~-..i...:....:, ...... i...i..i., i i.i...i..:...:.... ~ .~ .... ........................... ~ ......... ~ ......... ~ ........... ~ ..................'[.~***~...;..: .~ .............. r..~ ...................... ;..~...~ ................. ~ .................... ~ .... : ~ . : . · --.:?.. ~---: ..... ~-..~---~-..~.-r...~-.*;---~---; ...... ~.-.~..?..~ ...... ~...~.--~**-~ ...... ~-..~..-~-..~ '..-~---~...~..-:-. ~..J.-.~--.¥..~ ...... ~.. ~...;-.*: ..¥-.~ .......... : ............ ~?....~...;.. :...~..~L..?. ..... ;.?~.-.; ..... ~-..~...~. ...... ~..L..;~..~ ......... L. L.~; ...... ?,...;.: ..... L..;...L.~...L.}~. "'}"'~'"¢"'} ..... }'"~"i'-~ ..... }'"?"~'! ..... ?'"}"'~'"~ ...... ~'";~"~'"? ...... ~'"}"'~'"~ ...... ~"!'"~ '} ..... ~'"~'"}'"~ ....... ~'"~'"}'"}'""'~'"L'} ............... ) ........ ~...~...:,...~.. [ ..... ~ ..... ; ...... ~ ...... ~...~. ..... ~.. ~ .... . ...... -.}-.-}.-~;.--}-. ~-..~.-}.--}..~:' ...... ~---~--.~-..~ ......... m~'..: .......... ~'.-~...:--- ---7--~,.-?...m,: .............. ..-?..-,--., ..... ,--.,--.,---, ...... ,...,-.-, ....... .-:--.,-'-,-..~ ...... ~---}-":--"~'--:"-~---~---} ............. :--'m; .......... . ~ ....... ~ .......... ~ ....... t...~...~ ......... .L_.L ..}...[ ...... :...L. ~ ............. :~..:~.., .......... :...:...: ..... :..~:...~_.: ...... ¢...~...~...:...~ ...~...~ ....... ~ ...... L..L..}...'. ...... }._L..L.: ...... L~.Z..}...~ ...... L..;...,...:...' .. ~...;...}...: .......... :...: .......... ~...:...:.~.~ ..... ~...~...;..~ ..... ; ...... ...}...}.~.}-.}.....}...~...}...~ ..... }...~...}...} ¢...~...~...¢ ...~..~-.~...~ ...... ¢..~...~...~ ...... ~...~...r...~.. ;._~...~...~...~ ...... ¢.?.~...~ ...~. ....... ~: . .......... ~_.~..,...~.: ............. ~..~...~...~ ...... ~...~...~..¢... ~. ~...~..~ ....... ~.. ~ ...... ;... ";'"T;'"~" ?"~'"~"'m':'"~'"'.'"~.':'~ ...... T~"'~:"~. ...... ~"T''.'''~. ...... T~:'"~"':"':'":.'"~-'~"T'~'"~'"~"*~'"~ ...... ~"'~'"~'"~ "T?"T~ ...... "'T~'"~" "T~"*?"~ ..... ~"'~'"~"'~ ...... :/'?.":'"~*'," :'T?:'; ...... ;, . WELL' 3R-19 VERTICAL PROJECTION -2000 -1000 0 0 1000 2000 ;~)00 4000 5000 8000 I:RCX~C'TtONONVEl~lIC, N, Iq. ANE 14.0~ 1~1.~ ~,7,.N..EDIN~R'tlCAI-DEFr~l~ I'~ORIZ~I.E..1 / 1000 AOGCC GEOLOGICAL MATE.~.iAL~ ~NYEN'J-ORY PERMIT ~ ~ -~ WELL NAME ~~ ~~/~ c~ec~ o~ ~r list d~ta as it is receive~.~ist received ~te f~r 4~7. if n~t re~ire~ list ~s NH 407 J* ~/F/~ dri!,lin~ hi?o~' ~, ~,?VeyI /J 'well tests j,~4 core, descriptio~,~ i ~.Ou TYPF J NO. (to thc nearest footJ [inchllOO'J I II I ARCO Alaska, Inc. Date- June 26, 1992 Transmittal #: 8470 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3 R- 1 9 Sub-Surface Directional 5- 2 4- 9 2 92332 Survey 3 R- 21 "" Sub-Surface Directional 4 - 2 7 - 9 2 Survey Receipt Acknowledged' D&M State of Alaska (2 copies) 92282 RECEIVED JUN 2. 9 1992. Alaska Oit & Gas Cons. commission Anchorage ARCO Alaska, Inc. Date: May 29, 1992 Transmittal #: 8448 RETURN TO: ARCO Alaska, Inc. ATTN: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Cased Hole items. return one signed copy of this transmittal. 3 R-1 9 Cement Evaluation Log ~ (CTU Conveyed) ~/ 3 R - 1 9 Cement Bond Log (CTU Conveyed) Please acknowledge receipt and 5-23-92 7100-8640 5-23-92 7100-8620 Receipt Drilling Acknowledge' State of Alaska(+sepia) RECEIVED ate' NSK Alaska Oti& (las Cons. Commission Anchorage ARCO Alaska, Inc. Date: May 29, 1992 Transmittal #: 8446 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATe-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3 R- 1 9 LIS Tape and Listing 5 - 1 4- 9 2 Receipt Acknowledged' - ........ DISTRIBUTION: Lynn Goettinger State of Alaska 92308 Date' RtE£- E-IVED JUN 0 2 1992 Alaska 011 & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Date: May 22, 1992 Transmittal #: 8438 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. and return one signed copy of this transmittal. Please acknowledge receipt 3R-19 CDN 3R-19 CDR Receipt Acknowledged' DISTRIBUTION: D&M Drilling 5/7-14/92 5/7-14/92 4059-9037 4059-9037 Date: R _~. (~-~t-V-E D MAY 2 2. 1992 Alaska 0il & Gas Cons. Commission Vendor Package(Johnston~nch°rage NSK State of Alaska(+Sepia) .. WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 May 1, 1992 A W McBride Area Drillig Engineer ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit 3R-19 ARCO Alaska, Inc. Permit No: 92-46 Sur. Loc. 1991'FNL, 2443'FWL, Sec. 9, T13N, R9E, UM Btmhole Loc. 15'FNL, 1672'FWL, Sec. 16, T13N, R9E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum'field inspector on the North Slope pager at 659-3607. cD~rdmWa~ Jo~ BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA .... AL!!~'-'"A OIL AND GAS CONSERVATION CC)MM, 5N PERMIT TO DRILL 20 AAC 25.005 I a. Type of Work Drill X Reddll r'l 1 b Type of Well Exploratory r'l Stratigraphic Test r'l Development Oil X Re-Entry r'1 Deepen O Service r'l Development Gas C] Sini3leZone X Multiple Zone 2.. Name of Operator 5. Datum Elevation (DF or KB) 1 0. Field and Pool ARCO Alaska, Inc. RKB 52', Pad 11' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25513, ALK 2554 4. Location of well at surface 7. Unit or property Name 1 1. Type Bond (see 20 AN::: 25.025) 1991' FNL, 2443' FWL, Sec. 9, T13N, R9E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 986' FSL, 1885' FWL, Sec. 9, T13N, RgE, UM 3R-19 #UG630610 At total depth 9. Approximate spud date Amount 15' FNL, 1672' FWL, Sec. 16, T13N, R9E, UM 5/3/92 $200,000 1 2. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and 'rvo) property line 3R-20 8,893' MD 15'~ TD feet 20' (~ 1300' feet 2560 6T756' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 4200md feet Maximum hole arkie 90° Maximum surface 2400 redo At total d~oth (TVDI 3372 18. Casing program Settin~ Depth size Specifications Top Bottom Quantit7 of cement Hole Casing Weight Grade Coupfin~l Length MD 'I'VD MD 'I'VD {include stage data) 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' :1:200 CF 12.25" 9.625" 36.0# J-55 BTC 4011' 41' 41' 4,052' 4,052' 540 Sx Permafrost E & HF-ERW 380 Sx Class G 8.5" 7" 26.0# L-80 NS(~ 4011' 41' 41' 4,052' 4,052' 380SxClassG BTC 4841' 4,052' 4,052' 8,893' 6,756' Top 500' above Kuparuk HF-ERW 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth ~'°rnU;tu~:~lr R E' C~ iV E L'~ Surface Intermediate Production "~" 0 ~ Liner /'~ ~'"~ ~ C- Perforation depth: measured AJasI~ 0ii & G,~,~ Co~s. ~.""r~r¢:F''''~°'¢'~,,,,.,. ., -,~ true vertical Arlchor~fle 20. Attachments Filing fee X Property plat C] BOP Sketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot r-1 Refraction analysis C] Seabed report D 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to lhe best of my knowledge Commission Use Only Permit Number ~.~ APl number Approval date See cover letter for Conditions of approval Samples required E] Yes ~ No Mud log required E] Yes ~ No Hydrogen sulfide measures r'l Yes ~ No Directional survey required .~ Yes r'l No Required working pressure for BOPE E] 2M ~ 3M r'l 5M I-1 10M E] 15M /. Other:  by order of Form 10-401 Re-~7/ ~.~ i i )mit in triplicate DRILLING FLUID PROGRAM Well 3R-19 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing 9.0-10.0 15-35 15-35 50-100' 5-15 15-40 10-12 9-10 10% _+ Drill out to weight up 8.6-9.3 5-15 5-8 30-40 2-4 4-8 8-10 8.5-9 4-7% Drilling Fluid System: Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD 10.3 10-18 8-12 35-50 2-4 4-8 4-5 9.0-9.5 <10-12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 2400 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest well to 3R-19 is 3R-20. As designed, the minimum distance between the two wells would be 20' @ 1300'. The wells would diverge from that point. Incidental fluids developed from ddlling operations will be hauled to the nearest permitted disposal well or will be pumped down the surface/production casing annulus of the last well ddlled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 175 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds. RECEIV[D AJaska Oit & Gas Co~s. Co~'~missio~ CREATED BY :JONES For: E FITZPATRICK ARCO ALASKA, Inc. Structure : Pod 3R Well : 19 Field : Kuparuk River Unit Location : North Slope, Alaska IDATE PLOTTED : 24-APR-g2 tPLOT REFERENCE tS 19 L VERSION #6. COORDINATES ARE IN FEET REFERENCE SLOT #19. TRUE VERTICAL DEPTHS ARE REFERENCE WELLHEAD. A B(~ker Hughes compgny S 13.62 DEG W ~aTO' (TO TARGET #~) **PLANE OF PROPOSAL** 600 ~00 - 120O_ _ 1500- - 1800_ - 21 oo_ - 2400_ - 2700- - 3000_ _ 3300_ - 3600.- - 3900- -- 4200_ -- 4500_ - 4800-- -- 5100_ o 300 5400- 5700_ 600( 63O0. 660( 690( 3O0 0 300 SCALE 1 : 150.00 <-- West RKB ELEVATION: 52' Boo 600 400 200 0 I I II II II I I 0 (-~ SURFACE LOCATION: rq TARGET ANGLE 1991' FNL, 2¢43' FWL 700 90.56 DEG SEC. 9, T13N, R9E .. 400 0 600 - _800 B/ PERMAFROST TVD--1692 - _1 ooo 1200 1400 0 T/ UGNU SNDS TVD=2722 ~6oo TARGET LOCATION: I 986' ESL, 188.5' FWL ~eoo I SEC. 9, T13N, R9E I zooo I T/ w SAK SNDS TVD=34-52 TVD=6586TARGET #1 _V TMD:7870 _2200 DEP:2370 _ B/ W SAK SNDS TVD=3852 SOUTH 2303 _2.400 WEST 558 9 5/8"CSG PT TVD=4052 _ KOP #1 TVD=4-200 TMD=4200 DEP=O .2600 - -2800 - BUILD 3 DEG / 100' ~ I TD LOCATION: I ~ooo X, 115, FNL, 1672' FWLI -  I SEC. 1 6, T1 3N, R9E I _3200 _3400 ~ END BUILD - BEGIN TURN TVD=5503 TMD=5633 DEP=511 TD TVD=6576 ~ K-5 TVD=5600 TMD=5767 DEP=602 EOC~1 TVD=5616 TMD=5788 DEP=616 TMD=8893 OEP=3392 SOUTH 3304-  . KOP #2 TVD=5979 TMD=6285 DEP=955 WEST 771  BUILD3 DEG/ 100' ~ T/ KUP SNDS TVD=6462 TMD=7159 DEP=1674- ~ TARGET #1 - Mid A1 TVD=6586 TMD=T870 DEP=2370 ~ TD - TARGET f~2 TYD=6576 TMD=8893 DEP=3392 I I i I I ' ' ' ',2'oo',5' .... 'oo Joo Joo 750 3o'oo'3/oo'31oo' 6O0 000 Vertical Section on 193.62 azimuth with reference 0.00 N, 0.00 E from slot ~19 RECEIVED APR Alaska Oil & Gas Cons, Com[n[ss~Of~ SCALE 1 : 50.00 East --> ~00 I 150 100 50 0 50 100 150 200 250 300 I I I I I I 181 I I I I I I I I I I I ~000 4200/~~44-oo / / ~ ~ /,.oo ~ ~oo / ~o ~ /~oo ~0o /S~oo ....... , ~ 0 .S / $~u~ : Pad 3R Will : l g ~ ~eld : Kupa~k River Unit Loc~ion t North Slope, Ala.ka 50 _50 ~1 O0 - _150 _ _200 _250 _300 - _350 _4.00 _450 _500 RECEIVED Alaska Oil & Gas Oons, Anchorage GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 3R-19 . ., . . . . . ,, . 10. 11. 12. 13. 14. 15. 16. 17. Move in and rig up Parker Rig 245. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (4,052') according to directional plan. Run and cement 9-5/8" casing. nstall ~Lnd test BOPE. Test casing to 2,000 psi. Drill out .cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole logging while drilling to total depth (8,893') according to directional plan. Run and cement 7" casing. (If significant hydrocarbon zones are present above the Kuparuk, sufficient cement will be pumped for isolation in accordance with 20 AAC 25.030.) Pressure test to 3,500 psi. ND BOPE and install lower production tree assembly. Secure well and release drilling rig. Run cased hole cement evaluation and gyro logs. Move in and rig up Nordic Rig 1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. RECE V'E D 7 , 6 5 4 3 13 5/8" 5000 i-,51 BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE LINE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE UNES. 7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. CONTINUE TESTING ALL VALVES, LINES, AND CHOKES WITH A 250 PSI LOWAND 3000 PSI HIGH. TESTAS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16" - 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5000 PSI SPACER SPOOL 4. 13-5/8"-5000 PSI PIPE RAMS 5. 13-5/8" - 5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5000 PSI ANNULAR RECEIVE[) '...UPARUK RIVER UNI, 20" DIVERTER SCHEMATIC 5 6 4 3 DO NOT SHUT IN WELL UNDER ANY CIRCUMSTANCES MAINTENANCE & OPERATION . UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD 3. DIVERTER ASSEMBLY WITH ONE 2-1/16"- 2000 PSI BALL VALVE 4. 20" - 2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION EDF ~2 Alaska Oii gnchora~e ITEM (1) Fee (2) Loc: ,., ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE DATE ?(p,.-., . [2 thru 1 (]3) Admin [~F ~_~/~ 9. ['g thru 1'33 ' ' 10. [lO g 13] 12. 13. [1~ ~hru 22] 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26, 27. 28. (5) BOPE Company /Z~fC r~ Lease g Wel 1%,/z~Z[ [23 thru 28] YES NO Is permit fee attached ............................................... ./~, Is well to be located in a defined pool .............................. /~, Is well located proper distance from property line ................... ~ ..... Is well located proper distance from other wells ..................... /~ ............ Is sufficient undedicated acreage available in this pool ............. Is well to be deviated & is wellbore plat included ................... Is operator the only affected party .................................. ~. , ....... Can permit be approved before 15-day wait ............................ , Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease n~nber appropriate .......................................... Does well have a unique name g n~nber ................................ /~. ,, Is conductor string provided ......................................... //~ ... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. /~ .... Is enough cement used to circulate on conductor & surface ............ ~ . ..... Will cement tie in surface ~ intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... . ....... Is old wellbore abandonment procedure included on I0-403 ............. Is adequate wel 1bore separation proposed ............................. ~ . Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~O~ .psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... REMARKS (6) Ot he r /~p~' ~/~ ~//~Z 2 9. [29-th~u 3i~] 30. ~ / 31 . (7) Contact 32. (8) Addl 33, FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nLrnber of contact to supply weekly progress data ...... Additional requirements ............................................. / // 0 --I geology' eng i neer i ng: DWJ~ M TM/~ 'LCS RP~/~ BEW RAD ~-~2 rev 04/92 joi6.011 INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA SHORE Additional remarks' Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. -... .. * ALASKA COMPUTING CENTER * FIELD, NA.~E BOR. OUG~ STATE APl:NUmBER REFERENCE NO ARCO ALASKA, INC, KUPARUK RIVER NORTM~$LOPE ALASKA 92308 RECEIVED JUN OZ 1992 Alas~ 011 & Gas Cons. Commission Anchorage Tape, Verf~icat&on l,,istl~nq chlumbe, rger AlasKa ComPuting' Center .19-~AY-1992. 07:08 SERVICE' NAME ~ EDIT D~T~'A : 92/05/.19 ORIgiN : FLIC REEL NAME : 92]08 CONTINUATION ~ : PREVIOUS REEL : CQ~ENT : ARCO ALASKA INC., 3R-'19, KUPARUK RIVER", 50-029-22269-00 **$* TAPE HEADER SERVICE NA~E : EDIT DATE : 92/0S/19 TAPE NAME : 92308 CONTINUATION # :~ 1 PREVIOUS TAPE~ COMMENT : ARCO ALASKa XNC., 3R-.~9, KUPARUK RIVER, 50~029-22269-00 PA~E~ **** F'ILE HEAD'R FIL .... NA~E' : EDIT 00! SERVICE : FbIC V~RSION DATE : 92/05/'19 MAX REC SIZE FILE TYPE : bO LAST FILE COMPS'NY NA~E: ARCO ALASKA, INC.' ~ELL. 3R-19 F!ELD~ KUPARUK RIVE~ BOROUGH~ NORTH SLOPE STATE: ALASKA API NUMBER: 50-029-2~269 LOCATION: ~99!' FNL & 2443' FWL SECTION: 9 TOWNS~/P: 13N P~R~ANENT DATUm: ~Sb ELEVaTIOn: 0 LOG MEASURE0 FRO~ RKB 52 RANGE. 9E ABOVE PERMANENT DATUM I8 T~e ver~f.~.cetion btst[n.g ch[un)her~eT A[es)~e ComPut:[nq Center .t 9-'MAY-1992 07:08: .. ELEVATIONS KB~ 52 DF: 52 Gbt 11 DATE LOGGED~ 14-MAY-g~ RUN NUMBER: ONE TO DRILLER: 9037 TD LOGGER: 9037 CASING 1: 9 5/8" 36 hB ~ DRXLbE.. DEPTH OF TO 40:59 BIT SIZE l..t.. 8 I/2". TYPE FLUID IN MOLEI GEL/LIGNITE DENSITY: 10,5 VI$COSX'TY~ 42 PH: 10.5 FLUID LOSS: 4.2 MUD RESISTIVITY: FIbTRAT RESISTIVITY: .1,93 8 67 1.67 ~ .6.'7 MAXImUm: TEMP RECORDED: 155 bOGGING DISTRICT: LOGGING EMGINEER~ PRUD.HOE BAY ST. AMOUR TOOL NUMBERS: RGS022 NOS042 FIELD REMARK.S: RU" : DRILLED INTERVAL - 4514' TO ''. RGSOL,./NDS042 US =, ~ 3~ RUN 3 : DRILLEO I~TERVAL . 753 ~ TO 8345¢, RGSOL1/NDS049 USED,. RUN 4 : DRILLED INTMRVAL ~ 8~45~,~ TO 90~7'~ RGSOLl/NDS049 USED, RUN i THRU 4 ~ BIT TO DENS, =. ~01', BIT:TO NEUT', ~= 108': ' BIT ~0 RES. - ]4.~, BIT TO GR ~. 44,76.. SLIDING INDICATOR SHOWN IN DEPTH TRACK. MATR'I~ DENSITY~.65 GM/CC. FLUID DENS'iTYm~.O GM/CC HOLE CORRECTIO...~M : BIT SIZE. MAXIMUM DENSITY PROCESSING DATE JOB STARTED: 19-MAY-9~ dOB REFERENCE NO: 92308 bDP/ANA: DEE$ ****************************************************************************** FILE - EDIT,O01 ARCO ALASKA INC. KUPARUK RIVER 3R-19 50-029-22269 MAIN PASS LWD LOG DATA IS Ta e: Verification L,ist!n9 ChlU~.,~erger AlaS+~a: Computinq Center * TME DENSI'T¥ DATA PRE~,.EN'TED ON THIS LIBrArY TAPE IS ~ DATA SAMPLED EVERY -,5000 FEET * DATA: ! N C L U D ED -,, * TOOL ~XTENSIOM TOOL *. TYPE USED NAMg , * RG8 ,LWD' LOGGING WHILE DRILLING RESISTIVITY/GR * MOS 'bW!) LOGGING M'MIL~ DRILhIM~ ~EUTRON/DENSXTY FROM '~"' ' RHOB MAX 4059' TO 9005' 4059' TO 8930' PAGEI 3 TABLE TYPE': CONS TUNI VALU DEFI TYPE FL SECT STAT NATi LATI LONG WlT~ pDAT EPD TOD OFT DFD DFV DFL ~ST 2FST R~CS FT FT FT FT FT FT FT FT FT G/C3 CP F3 DEGF DEGF OHMM A~CO ALASKA INC.: 50.029.222~ 1991'F~ 9 9E NORTH SLOPE ALASKA USA: 549017 52. 9037, 9037..: 4059, GEL/LIGNITE ~0,5 10.5 1'93 67 67,' Compan~ ~ame Field..'~a e. weiiName APl Serlal Number Field Location Section Township RanQe CouSt~ State, or Prov~nce Nation Latitude bonQ~tude witness' Name Service Order Number Permanent datum Elevation oi Perm, Da Lo Measured~From A~VE. PERMANENT DATUM Elevation of Derric~ Elevation o~.Grognd 5 TOtal bepth~ 'Drlller Total DeDth -.Logger. Bottom~Log Interval Top 5o~ Interval Drilll6g FlUid Type- Drilling Fluid Densit Drilling Fluid pn Drillingg Fluid Viscos Drillin F1u d Loss Resistivity oZ )~ud Sa ~ud Sample Tempe~atur Resistivity of mud fi ~ud, Filtrate sample T Resistivity of MUd Ca ZONE ChlUmLerger~ AlasKa Computing Center 19-~AY-1992 07:08 PAGE~ 4 TUNI VALU DEFI TYPE' . ~CST ~ [..EGF mud Ca~e Sample. Tempe ZONE STE~ DEGF -999°35 Surface Temperature BMT DEGF !.55,, 5ottom Hole Temperatu T .BLE TYPE ~ ZONE TUN! BDEP TDEP RMC$ MCST 1 FT O. O, O. TABLE TYPE ~ CURV DEPT DRHO PEF DCAL DPHI TNP~ ATR PSR ROPE DEFI Depth Channel Name Bul~ Denstt¥ Delta RHO PDotoe!.ectri¢ Factor Differential Caliper Density Porosity Thermal Neutron Poros~tV DATA FORMAT S. ECiFICATION R~CORD **. SET TYPE - 64EB ** TYPE REPR CODE VALUE ! 66 0 2 66 0 3 73 44 4 66 5 66 6 73 7 65 8 68 0,5 9 65 FT 1! 66 23 12 68 !9..~:AY"~99~ 07~0B PAGE: 14 65 KT 15 66 68 16 66 ! 0 66 0 ** SET NAMK SERV UNIT ED DEPT FT R~OB bWD G/C3 5490 DR~O L~D G/C3 5490 PEF LWD 5490 DCAL LWD IN 5490 DPH! LWD PU 5490 TNPN LWD PU 5490 ATR LWD OHMM 5490 PSR LWD OH~ 5490 ROPE LWD ~/HR 5490 G~ LWD GAPI 5490 TYPE - CHAN ** SERVICE API APl APl ~PI KIBE REPR PROCESS ORDER # 50G TYPE CLASS ~D NUmB SAMP ELEM CODE 54901.7 O0 000 O0 0 1 I 1 4 68 0000000000 17 O0 000 O0 0 I 1 I 4 68 0000000000 17 O0 000 O0 0 I 1 1 ~ 68 0000000000 17 O0 000 O0 0 1 1 I 4 68 0000000000 17 O0 000 O0 0 I 1 I 4 68 0000000000 17 O0 000 O0 0 1 I I 4 68 0000000000 17 O0 000 O0 0 1 1 I 4 68 0000000000 17 O0 000 O0 0 i 1 I 4 68 0000000000 17 O0 000 O0 0 I I I 4 68 0000000000 17 O0 000 O0 0 I 1 I 4 68 0000000000 ~7 O0 000 O0 0 1 1 1 4 68 0000000000 m#mm~mmmmmmmmmmmm'mmmmmmmmmmmmmmmmmmmm ** DATA ca ..Lw PSR,LwD DEPT PSR,~WD DEpT.: DCAL.LWD PSR'LWD DEPT': DCAL,LWD PSR'LWD DEPT P$~.LWD DC~L 9036, :500 :999250 9 91 so 900:0,000 '999':025080 70 89=00.000 0. :187 64.223 8BO0,O00 0,23t 67.469 8700 000 0!168 78 368 8600,000 0.224 78.8B1 RHOM.LWD -999..250 DRHO.LWD -999.250 PEF'LWD DPHI,LWD -999,250 TMP~.LWD -999'250 ATR.LWD ROPE,LWD -999,250 GR,LWD ,999.250 ROPE'bWD 71,993 GR,bWD -999':25:0 RHOB,LWD 2.~334 DRRO.bWD 0,009 PEF'LWD ROPE,LWD 401:14 5!' 50 GR .814 . LWD . RHOB.LWD 2.318 DRHO.LWD 0.011 PEF,LWD ROPE.LWD 63,828 GR,UWD 54,629 RHOB.LWD 2.236 DRHO,LWD 0.00! PEF.LWD DPHI.LWD 0251 TNPH,bWD 27'!00 ATR.LWD ROPE,LWD 33:149 GR,L~D 44,800 RHOB,LWD 2,286 DRHO,LWD 0.002 PEF.LWD DPMI'bWD ~'708 GR.LWD 40.901 ,22! TNPH,LWD 26.700 ATR.LWD ROPE'LWD 2 2999:.250 999'250 -999250 2-3~2 52.645 48,366 2.109 52'645 2.232 53'850 Tape Verification Ltsttnq chlumberqer Alaska Computin~ Center P S ~. l, W D 71 · :4 · ROPE;LWD: D~Ah,.LWD 043 .PHt. LWD DEP~.: 8200.000 DCAL,LWD 0,368 DPHI'LWD PSR*LWD 62"~t! D~AL*5WD 0,000 DPH!'LWD PSR~L~D 86.034 ROPE~SWD PSR*LWD 70,030 ROPE~LWD DEPT* 7900.000 RHOB.LWD .000 PSR;LWD ! .686 ROPE,LWD DCAS.,LWD 0~00 DP~,DWD PS~*LWO 75*53'7 ROPE-LWD D.:A[',L~D 0,337 PSR.LW'D 62.75t ROPE.LWD DEPT*::: 7600.000 RMOB'*bWD DCAS.LWD 0.000 DPHI*SWD PSR.LWD 5'290 ROPE.LWD DEPT. 7500.000 DCAL~LWD 0 000 DPHI.LWD PS~.LWD 4:0~3 ROPE. LWD DEPT*:~ 7400.000 RHOB.LWD DCAL LWD 0.275 DPMI.hWD PSR:LWD 3.294 ROPE.LWD D~PT , 7300,000 19-'~AY-].g92 07~08 2.29! 0.~18 58. 24 4 2.3~8 2-294 2.305 0~209 90'910 2.515 2~.o~2 .725 2.3,18 ~76;478 2'38! O~ 3 2.415 0,:.1~.3 31'9 2 2.376 0 6 2.469 0 log 43; 66 2,402 0.!50 124,142 DRHO.LWD TN~H,L~D TNPH-LWD GR.~WD DRHO'~WD TNPH.SWD GR*bWD DRHO*b...WD TNPH'5WD GR,~WD DRHO'.SWD TNpH,bWD DRHO,LWD TNPH,~WD GR'LWD DRHO.LWD TNPH'LWD GR,SWD DRHO,LWD TNPH~LWO GR~L~D DRHO~GWO TNPH~GWD GR!~WD DRHO.LWD TNPH,LWD GR,LWD DRHO,LWD TNPH.I, WD GR,LWD DRHO,DWD TNPH'LWD GR,L~D o'ol 28'~,100 46,305 .o 2:7 :00 44:843 0.012 29~300 44.685 o olo 28 900 54 969 -0:002 28 000 45 226 42,670 0,000 29;~100 81;623 o'oii 26,200 42.163 -0.042 23.~00 41.16! 0,014 29 800 0.046 3~.400 10 .806 0°007 37.600 t2!.059 !~:°°°827 PEF*LWD ATR'LWD PEF, L WD AT~,LWD PE .LWD ATE. PEF* L WD ATR*L...D PEF,LWD ATR.LWD PEF.LWD ATR*LWD PEF.5~D ATR.L~D ATR.SWD PEF.L~'D ATR.L~D PEF,LWD ATR.LWD PEF.LWD ATR.LWD PEF.LWD ATR,LWD PEF.LWD ATR.LWD PAGE: 2,167 45,627 2,412 41 ~ 7 4 2 36,8!8 79.2 3~::818 2,7 ! 9 3i; 377 3,24 i ! 3,985 ,2.47 8 36'818 3,774 4,854 41. O84 3,907 3.536 2.336 3,365 2,111 Tape vertficatfon~List~ng :hlumberger Alas~a ComPuting Center DEPT'~= DCAb,PWD' PSR..LWD DEPT, DCAS*SWD PSR'LWD DEPT, D~P?' DCAL'LWD D.£P~- DCAfi.LWD PSR,LWD DEPT PSR'LWD DCA. L,LWD PSR,LWD DEPT-i~ DCAL,LWD PSR.LWD DEPT.. DCAL.LWD PSR,LWD DEPT. DCA.~,~WD PSR.LWD DEPT. DCAS.LWD PSR.LWD DEPT PSR.LWD 7200 000 0 000 :3 .396 7100,000 0'000 3,699 6900,000 ..,99! 6808,000 5'253 6708,000 .000 3,180 6600,000 0,000 6~oo'ooo 0,147 2'095 OOooo 000 2,578 000 1.866 6100.000 :ooo 6~0 6000.000 0,000 2.035 RHOB.GWD DPHI,LWD RHOB'.i. WD DPHI,LWD ROPE.SWD RHOB.LWD DPH!'hWD ROPE'LWD RHOB'LWD DPHI'bWD ROPE'SWD HOB,LW'D PHi~LWD ROPE'LWD RHOB'~WD DPHt~SWD ROPE,SWD RHOB'LWD DPHI*bWD ROPE,LWD RHOB~LMD DPHI~LWD RMOB'LWD DPH!.LWD ROPE.LWD DPHI,LWD RDPE.LWD RHOB LWD DPH~:L~D ROPE.LwD RHOB 5WD DpHI:LWD ROPE.L~D RHOB~LWD DPHI,LWD ROPE.LWD 07:08 :21.476 0~i05 2,7 t -o 41 7t. 2.477 0,:105 178.216 ::~ i : 2,384 0,16X 95,237 ~.0'5 163'9'32 2,475 0 ,,106 ~I7 O35 2-388 159 0,~,~9 16.3,622 9O 158 0,142 119,~05 2,390 0,158 !30.434 DRHD'5~D TNPH'~:SWD GR,hWD' DRHO'b~D ?NPH,bWD GR~LWD DRHD'SWD TNPH,LWD GR'GWD DRHO.bWD ?NPH~;G~D T~!PH,bWD GR,LWD TNpH'LWD GR,LWD DRHO.bWD ?NPH.GWD GR.bWD DRHO.b~D TNP~,LWD GR'GWD' DRHO..LWD TNPH"LWD D~HO.SWD TNPH,LWD GR.LWD DRHO.LWD TNPH'~WD GR.LWD DRHO.~WD TNPH.LWD GR.LWD DRHO.LWD TNPH.~W~ GR.L~D o.o~ 39.900 99,425 0.074 36'300 144'159 30 06 t05.695 0 006 342200 134,401 48. 0~08 5OO 154'364 0,00 37.80~ I73,199' ~-0.:001 29.300 t!1.534 0'011 33,400 1.45':9:i8 ;8 .007 '400 96'351 13!.858 O. 34.~ 0 79,134 900 79.320 2 :oo6 000 97,022 PEF.LWD ATR.LWD PEF.L~iQ ATR.L~D PEF.I.,WD ATR'LWD PEF 5WD PEF,.bWD ATR,LWD F PE._,LWD PEF*SWD ~TR'2L~D PEF'L~D ATR'5~D PEF'SWD A?R,L~D PEF,L~D 4TR.L~D PEF,~ND ATR,L~D PEF,b~D ATR.LND PEF,LWD ATR.LWD PAGE1 , 009 .043 3,745 2'858  ,492 ,644 '631 ];279 368 ,9!29 ,920 998 2.877 1.'863 679 3,010 1.846 IS Tape~.veriflcation Listing ~hlumberger Alaska ComPut. .. ln~.. Cente'r DEPT PSR,LWD DEPT PSR*LWD PSR,LWD DEPT. PSR.LWD DCAL~SWD PSR:,LWD DEPT.~ DCAL'LWD PSR'LWD DEPT,.~ DCAL~LWD PSR,LWD PSR.LWD DEP~, DCAb,LWD PS~'LWD DEPT' DCAL*LWD PS~.LWD DEPT. DCAL PSR:LWD DEPT PSR.LWD DEPT 9$~.LWD oo0 RHO~*LWD 590~000 DPHt.~LWD · i05 ROPE,L~ .. 5800.000 RHOB*LWD 5700'000 0 * 000 DPS~, '428 ROPE,L~D ;000 DPH!;LWD 2,6~4 ROPE,LWD 5500 ooo 0:000 DP~I'LWD I'654 ROpE~LWD 5400,000 RHOB'*LWD 0,!02 DPH!.~LWD 2,011 ROPE*LWD 123 DPHI,bWD 2,460 ROP'E*LWD: · 094 DP'HI,LWD ~,427 ROpE,LWD 5108,000 RHOB,LWD:! 2,000 DPHt,LWD · ~727 ROPE,LWD 5o0o'0oo 2.384 ROPE,LWD 0:800 .... ~eoo.ooo R~O8 ~D · '-o ooo 2:274 ROP£.LwD 4'700.000 RHOB.LWD 0,000 DPHI.LWD 2.236 ~OPE.LWD lg-~AY-:Ig92 07:08 ~:455 D~HO.SWD 1:18 TNP~'LWD 109'147 GR'LWD 2,43.3 DRHO,~WD 0,132 TNPH*L~D 149,~74 GR,LWD ~.447 =DRBO,LWD 0,123 TNP'H,LW~ 149,677 'GR,LWD 2,424 DRHO.LWD 0~137 TNPH.L~D ~W !54:172~ 2:.440 DRHO.LWD 02 ~.448 DRHO.LWD 0;122 ~NP~'LW~ I27'656 GR,bWD ~!'42! D~RO.LW'D 30~t39 TNPH,LWD I3,336 GR'L~D 4O TNPH'5~D 178 238 ' 'GR'bWD I56'518. GR,LWD. 0.1 TNPH.bWD 199.540 GR,LWD 2,397 DRH. O,LWD 14~153 TNPH.LW~ .437 0.. 6 TNPH.'LWD 137,934 GR'LWD . o' ,o ,~, o 35,'600 !7'412 ~0.008 29~9 0 97.5~4 0.000 36.000 05.01,2 0.013 32.~100 98.:163 0 ,037 z{ :9oo 79,890 8 0.080 .o'oo 29,500 70.85'3 000 85,594~ 0,006~ 34,~O00 96..3,19 o i, o o s 35.200 94-269 .001 ~.100 i6.263 O.Olg 31..~00 71.672 0.002 37.300 81.461 PEF,LWD ATR,LWD ATR~LWD PEF'LWD ATR.LWD PEF*DWD ATR,LWD PEF*LWD A. TR,LWD P~F*LWD ATR,LWD PEF'LWD ATR',~WD PEF,L~D ATR;LWD PEF,L~D ATR*LWD PEF LWD ATR:LWD Pg~,SWD A?R,LWD PEF LWD ATR:LWD PEF,bWD A. TR,~WD PAGE: .. 3'391 2.107 3~,~136 2,888 3 * ~030 2; :756 3,4~9 ~,836  '944 '133 · .534 3,084 2'858 3.006 2.489 3 152 384 3 090 2:207 IS Tape verification Listing chlumberger Alaska Computing Center 4600,000 o.ooo DCA W PER:.LWD 2.633 RHO8 LWD DPHI~LWD ROPE.LWD RHDO. LWD DPHI .LWD ROP~.LWD RHOB LWD DPHX2~WD ROPE'LWD RHOB bWD ROPE.LWD RHOB.LWD ROPE,LWD RHOB,L~D DPHi,LWD ROPE.LWD RHOB.SWD DPHI,LWD RDPE.LWD RH~B,LWD DP~I.LWD ROPE. LWD DEPT. 450§, DC4.[~.swr~ :,297 PSR.LWD 1.539 DEPT 4400,000 o P$~.LWD 21:709 DEPT, 4300.000 DCAL,LWD 0,054 PSR,LWD 2.769 DEPT. 4200 00o0 DCAL.LWD 0~ 00 PSR.LWD 2.953 DEPT. 4100.00o DCAL,L~D 0,122 PS~.LWD 2.71~ DcADEPIT, LWD . 566 PER LWD -999 250 DEPT 3950,500 DCAL~LWD -999.250 PER,LWD -999.250 ** END OF DATA FILE NAME : EDIT ,001 SERVICE : FLIC VERSION : O0tA06 DATE : 92/05/lq ~X ~C SIZE : i024 FILE TYPE : LO LAST FILE 19..~'AY-1992 07:08  ,279 DRH0-SWD 27!,225 TNPH'SWD ,288 GR.LWD 2,367 DRHO.SwD 0,!7{ 340,697 ' GR,LWD . .342 DRHO,hWD *1~7 86,5.38 2,327 DRH0.bWD 0,~96 TNPH.~WD 248.5~6 GR'LWD 2,2~8 DRHO.LWD 0.2 5 TNPH'SWD 285'867 GR.LWD 2 376 DRH0.LWD 0]~66 TNPH,I~WD 522,887 GR.LWD 2'383 DR~O.LWD 0,~62 -999,~50 GR,~WD '999, 0 TNPH.,LWD ~999.250 Gg.LWD 0 4 00 8t.~103 0 18 73 204 0 0.002 39.200 68.033 -0.005 39.600 67.183 00~ . . 80'758 -999'.~50 -999.~50 P E F. t N D PLF.LWD ATR ..bWD PEF AT:R. PEF, L~:D ATR.LWD PEF.bWD ATR'.bWD PEF,LwD ATR'LWD PEF'LWD ATR,LWD PEF.LND ATR'LWD PAGE: 2.70 2,7A2 ,980 ~. 847 3' 002 i' ii 59 2'648 3.04.0 4 'ooo .'250 -999,250 -999'250 IS,Tape Verification Listing ~hlumberger Alaska Computin~ Center 10. SERVICE NA~E ~ EDIT DATE ORIGIN : FL!C TAPE NA~E : 92308 CONTINUATION ~ PREVIOUS TAPE COMMENT : ARCO ALASKA INC., 3R-IA, KUPARUK RIVER, 50-029-22269-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 92/05/19 ORIGIN : FLIC REEL NAME .'.92308 CONTINUATION # : PREVIOUS REEL C...MMENT .." ARCO ALASKA INC'., ~]R-~9, KUPARU'K. RIVER, 50,,029-22269,,00