Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2024 Endicott Oil Pool Hilcorp Alaska, LLC Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: 907/564-5246 Gavin.Dittman@hilcorp.com April 1st, 2025 Brett Huber Sr, Chair Alaska Oil & Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: DUCK ISLAND UNIT, ENDICOTT FIELD, ENDICOTT OIL POOL, STATE OF ALASKA, 2024 ANNUAL RESERVOIR REVIEW Dear Commissioner Huber: In accordance with Conservation Order No. 462, Hilcorp Alaska, LLC (“Hilcorp”), as Operator, hereby submits for your review the following Annual Reservoir Review for the Endicott Field. This is the Annual Reservoir Review and corresponds to events during the 2024 calendar year. The Endicott Field has been on production since October 1987. A. Progress of Enhanced Recovery Project and Reservoir Management Summary During 2024, two new wells were drilled in the Duck Island Unit in the Eider Oil Pool. The locations of all other wells in the Duck Island Unit remain unchanged. Production and injection statistics are summarized in Table 1. Average daily oil production from the Endicott Oil Pool was 4593 bopd and average daily gas injection was 318 mmscfpd. During 2024, injected fluid was calculated to be 9158 thousand-reservoir barrels (MRB) less than reservoir voidage. At year end, the reservoir overall cumulative voidage replacement ratio was 0.84. The average reservoir pressure varies between zones. The average of surveys run in 2024 was 3874 psia. Hilcorp became the official operator of the Endicott Field effective November 18, 2014. Hilcorp will continue to identify and improve waterflood pattern efficiency by allocating existing water injection volumes and adding perforations in active injection wells. Hilcorp is currently reviewing debottlenecking projects at Endicott to boost gas and water handling capacities. The field is continuing to evaluate options to reduce H2S production rates in producers. Page 2 As of 12/31/2024 Full year (1) As of Dec-24 (2) Producers 58 52 Injectors 28 28 2024 Cumulative Start- Up through 12/31/23 1,681,072 489,351,649 128,604,670 4,301,595,635 76,393,089 2,399,653,536 76,924,849 2,331,596,879 116,470,360 3,720,829,540 165,666,794 5,745,923,685 156,509,046 4,874,039,704 -9,157,748 -871,883,981 4,593 351,379 208,724 210,177 318,225 3,874 psiaAverage of surveys obtained in 2024 Water, BWPD Injection Water, BWPD Gas, MCFPD AVERAGE RESERVOIR PRESSURE DAILY AVERAGE RATE DATA 2024 Production Oil, BOPD Gas, MCF/D Gas (MCF) Balance Cum Production (MRB) Cum Injection (MRB) Over/Under (MRB) Oil (BBL) Gas (MCF) Water (BBL) Injection Water (BBL) (1) Well count data reflects ONLY those wells which contributed to production/injection during the respective year (2) Active wells as of December 31 2024 PRODUCTION/INJECTION STATISTICS Production Table 1: ENDICOTT FIELD 2024 OVERVIEW STATISTICAL SUMMARY WELL STATISTICS NOTES: Page 3 B. Voidage Balance by Month of Produced Fluid and Injected Fluids – 2024 C. Summary and Analysis of reservoir pressure surveys within the pool The following key wells in the Endicott Pool were proposed in 2024: 2024 Key Well Program 2-62 S3A, F1, F3 2-38 Ivishak 1-19 K2B 2-56A Sag River - Eider 1-33B K2A 2-18 S3A, F1 Endicott Oil Pool Datum: -10,000 ssTVD Eider Oil Pool Datum: -9,700 ssTVD Static bottomhole pressures collected in 2024 are summarized and submitted on the form 10-412 form below. The following key wells in the Endicott Pool will have static bottomhole pressure measurements captured in 2025; Month Oil, RB Free Gas, RB Water, MRB Total Voidage, MRB Year Cum, MRB Cum since start-up, MRB Formation Gas, MRB Water, MRB Total Injection, MRB Year Cum, MRB Cum since start-up, MRB Net Injection, MRB Year Cum, MRB Cum since start- up, MRB Jan-2023 205,678 7,769,044 6,669,589 14,644,310 14,644,310 5,594,901,201 7,093,626 6,704,803 13,798,429 13,798,429 4,731,329,086 -845,882 -845,882 -863,572,114 Feb-2023 197,342 7,363,713 6,462,808 14,023,863 28,668,173 5,608,925,064 6,732,667 6,470,747 13,203,414 27,001,843 4,744,532,500 -820,449 -1,666,331 -864,392,563 Mar-2023 197,126 7,624,899 7,164,317 14,986,342 43,654,515 5,623,911,406 6,939,957 7,175,509 14,115,466 41,117,309 4,758,647,966 -870,876 -2,537,207 -865,263,440 Apr-2023 183,312 7,246,240 6,463,418 13,892,970 57,547,485 5,637,804,375 6,584,384 6,470,701 13,055,085 54,172,394 4,771,703,051 -837,885 -3,375,091 -866,101,324 May-2023 177,679 6,631,390 5,736,827 12,545,897 70,093,382 5,650,350,272 6,034,476 5,734,766 11,769,242 65,941,636 4,783,472,294 -776,654 -4,151,746 -866,877,978 Jun-2023 195,121 7,353,125 6,648,853 14,197,099 84,290,480 5,664,547,371 6,721,367 6,663,439 13,384,806 79,326,442 4,796,857,100 -812,293 -4,964,038 -867,690,271 Jul-2023 202,072 7,293,084 6,841,749 14,336,905 98,627,385 5,678,884,275 6,700,655 6,841,051 13,541,706 92,868,148 4,810,398,806 -795,199 -5,759,237 -868,485,470 Aug-2023 181,969 6,739,185 6,178,579 13,099,733 111,727,118 5,691,984,008 6,163,803 6,179,816 12,343,619 105,211,767 4,822,742,425 -756,114 -6,515,351 -869,241,584 Sep-2023 150,368 5,861,825 4,729,110 10,741,303 122,468,421 5,702,725,311 5,350,350 4,867,679 10,218,029 115,429,796 4,832,960,453 -523,274 -7,038,625 -869,764,858 Oct-2023 187,816 7,786,052 6,483,474 14,457,342 136,925,763 5,717,182,654 7,223,447 6,661,597 13,885,044 129,314,840 4,846,845,497 -572,298 -7,610,923 -870,337,156 Nov-2023 190,125 7,581,138 6,307,205 14,078,468 151,004,231 5,731,261,122 6,953,427 6,388,278 13,341,705 142,656,545 4,860,187,202 -736,763 -8,347,687 -871,073,920 Dec-2023 202,522 7,752,881 6,707,160 14,662,563 165,666,794 5,745,923,685 7,086,038 6,766,463 13,852,501 156,509,046 4,874,039,704 -810,062 -9,157,748 -871,883,981 Produced Fluids Injected Fluids (Injection - Production) 6. Oil Gravity: 22 8. Well Name and Number: 9. API Number 50XXXXXXXXXXXX NO DASHES 10. Type See Instructions 11. AOGCC Pool Code 12. Zone 13. Perforated Intervals Top - Bottom TVDSS 14. Final Test Date 15. Shut-In Time, Hours 16. Press. Surv. Type (see instructions for codes) 17. B.H. Temp. 18. Depth Tool TVDSS 19. Final Observed Pressure at Tool Depth 20. Datum TVDSS (input) 21. Pressure Gradient, psi/ft. 22. Pressure at Datum (cal)psig 2-62 5008420008 O 220100 S3A, F1, F3 9920 - 9939, 9962 - 9985, 9989 - 9993, 10001 - 10009, 10014 - 10018, 10095 - 10105, 10128 - 10136, 10143 - 10195 6/24/2024 504 SBHP 206 10,000 4,137 10,000 0.41 4,137 1-19 5008420068 O 220100 K2B 9829 - 9835 5/25/2024 192 SBHP 204 9,800 3,642 10,000 0.09 3,659 1-33B 5008420069 O 220100 K2A 10016 - 10019 9/7/2024 216 SBHP 190 9,145 3,692 10,000 0.44 4,068 2-56A 5008420076 O 220165 Sag River 9434 - 9457, 9472 - 9506 5/28/2024 264 SBHP 188 9,400 1,359 9,700 0.36 1,467 2-18 5008420048 O 220100 S3A, F1 9920 - 9927, 9931 - 9937, 10007 - 10014, 10024 - 10031, 10076 - 10080, 10100 - 10105 6/1/2024 360 SBHP 190 9,275 3,294 10,000 0.09 3,359 2-38 5008420052 O 220150 Ivishak 9933 - 9957, 9982 - 9986, 9989 - 10068 5/25/2024 192 SBHP 208 10,000 4,222 10,000 0.43 4,222 2-72 5008420117 O 220165 Ivishak 10036 - 10051, 10070 - 10085, 10089 - 10115 11/16/2024 - SBHP 204 10,000 4,013 10,000 0.44 4,013 3-07A 5008420040 O 220100 K2B 9950 - 9958, 9973 - 9979, 9982 - 9993, 10015 - 10040 11/19/2024 19,752 SBHP 200 10,000 4,145 10,000 0.44 4,145 Comments: Gavin Dittman 23. All tests reported herein were made in accordance w ith the applicable rules, regulations and instructions of the Alaska Oil and Gas Conservation Commission. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Printed Name Title Date Reservior Engineer March 5, 2025 RESERVOIR PRESSURE REPORT 1. Operator: 2. Address: Hilcorp Alaska, LLC 3800 Centerpoint Dr Suite 1400, Anchorage AK 99503 7. Gas Gravity: Duck Island Unit/Endicott Endicott Field/Endicott Oil Pool -10000 .88 3. Unit or Lease Name: 4. Field and Pool: 5. Datum Reference: Page 4 2024 Key Well Program 3-33A K2A 2-58 F5 & F6 1-25A K2A 1-35 S3A 2-38 Ivishak 1-03 K2B Endicott Oil Pool Datum: -10,000 ssTVD Eider Oil Pool Datum: -9,700 ssTVD D. Summary and Analysis of Gas-Oil Contact or Gas Monitoring Surveillance Plan. No gas monitoring logs were obtained in 2024. A field wide current GOC is not likely to be identified as the Kekiktuk sands have several subzones that are vertically separated and have different permeability. In addition, faulting in the reservoir may lead to hydraulic isolation or partial pressure communication within a sub zone. E. The Following Year Gas-Oil Contact or Gas Monitoring Surveillance Plan. In 2025, we will run cased hole pulsed neutron logs as needed to monitor GOC and any potential remaining oil zones following additional rig intervention/workover. F. Results and Analysis of Production and Injection log surveys, tracer surveys, observation well surveys and any other special monitoring A production profile was obtained on producer 3-25B on 03/31/2024 which showed the bulk of the gas coming from the upper K2A interval. G. Future Development Plans & Review of Annual Plan of Operations and Development In 2024, Hilcorp increased unit production through well intervention projects and other optimization opportunities. The ongoing field studies of the Duck Island Unit will identify additional well intervention and production enhancement opportunities. Projects completed during the 2024 calendar year:  2-62 (Prod) – Endicott Oil Pool – USZ addperf  1-27 (Prod) – Endicott Oil Pool – K2B & S3A perf  2-54 (WINJ) – Endicott Oil Pool – Pulled HEX plug, restored injection into S3A  3-25B (Prod) – Endicott Oil Pool – Set patch over upper K2A for gas shutoff  2-16 (Prod) – Endicott Oil Pool – USZ addperf  2-72 (Prod) – Eider Oil Pool – New Ivishak producer  2-74 (Prod) – Eider Oil Pool – New Ivishak producer – collapsed liner Projects planned for the 2025 calendar year: In 2025, Hilcorp will pursue increased unit production through additional well intervention projects, any necessary infrastructure and facility repairs, and other optimization opportunities as they arise. Slickline, e-line, coiled Page 5 tubing, and other rigless interventions and planned throughout the year. Workover operations may be planned for 2025 execution. No drill wells are planned at Endicott within the 2025 calendar year. Hilcorp will continue to progress the Duck Island Unit field studies. This may include re-mapping potentially productive horizons, updating well histories, reviewing all production and injection data, material balance calculations, and reviewing results of recent well intervention projects. Sincerely, Gavin Dittman Reservoir Engineer - Endicott