Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-0801a. Well Status: GINJ …… Oil ……1b. Well Class: 5 Exploratory … Service … BP Exploration (Alaska), Inc 14. Permit to Drill Number/Sundry 191-080 6/21/1991 7/4/1991 GL PRUDHOE BAY, PRUDHOE OIL 4a. Surface: Top of Productive Interval: Total Depth: 1846' FSL, 700' FWL, Sec. 11, T10N, R15E, UM 768' FNL, 3666' FWL, Sec. 14, T10N, R15E, UM 927' FNL, 3833' FWL, Sec. 14, T10N, R15E, UM Surface: x- y- Zone -713946 5937904 ASP 4 11. …Gas SPLUG …5Abandoned 20AAC 25.105 Suspended 20AAC 25.110 … WINJ …WAG …WDSPL …No. of Completions: 3/17/2020 15. 50-029-22184-00-00 16. PBU 03-35 Well Name and Number: 9707' / 8771' 27.30 17. TPI:y- Zone -716988 ASP 4x-5935378 Total Depth: x-y-Zone -717159 ASP 45935223 10211' / 9227' None DNR Approval Number:19. 74-017 5. Directional or Inclination Survey: Yes No Submit electronic and printed information per 20 AAC 25.050 (ft MSL) 20.Thickness of Permafrost MD/TVD: CNT / TEMP / GR / BHC / DIL, CASING WT. PER FT.GRADE SETTING DEPTH MD TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED Location of Well (Governmental Section): Field/Pool(s): Date Comp., Susp., or Aband.:6. Total Depth (MD/TVD): CASING, LINER AND CEMENTING RECORD TOP BOTTOM 22. SETTING DEPTH TVD 9-5/8" 7" 91.5# 68# 47# 29# K-55 L-80 34' 31' 9339' 9652' 10207' 34' 31' 8442'9223' 8722' 8-1/2" 12-1/4" 11 yards Arctic Set 1140 cu ft MTC, 464 cu ft Class 'G' 307 cu ft Class 'G' 25. GRADE PACKER SET (MD/TVD) 26. [&U 3-1/2" 9.3# 13Cr80 9347' 9810' - 9824' 9810' / 8864' DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED PRODUCTION TEST27. Date First Production: Not on Production N/A Date of Test: Flow Tubing Press Oil-Bbl: Oil-Bbl: Gas-MCF:Water-Bbl: Oil Gravity - API (corr): Method of Operation (Flowing, gas lift, etc.): Gas-Oil Ratio:Choke Size: Water-Bbl: 9707' Open to production or injection?Yes …No 524. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): H-40 114'30"20" 13-3/8"34'3753'16"2762 cu ft AS III, 466 cu ft Class 'G', 109 cu ft AS I34'3485' 9311' / 8417' Set Whipstock Gas-MCF: Production for Test Period Calculated 24 Hour Rate Hours Tested: Casing Press: 114' ACID, FRACTURE, CEMENT SQUEEZE, ETC. TUBING RECORD DEPTH SET (MD) Yes …No 5Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed information ADL 028327 & 028332 319-542 Other … 12. SSSV Depth (MD/TVD): … Ref Elevations BF 28.56 (attached)… KB Form 10-407 Revised 3/2020 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Development Stratigraphic Test 2.Operator Name: 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. Date Spudded: 8. Date TD Reached: 9. 10. Plug Back Depth(MD/TVD): 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 60.00 Water Depth, if Offshore:13. N/A Zero API Number: Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 23. 18.Property Designation: 21.Re-drill/Lateral Top Window MD/TVD: N/A 1900' Approx. 5 Submit within 30 days of Completion, Suspension, or Abandonment &U/ By Samantha Carlisle at 8:03 am, Apr 15, 2020 RBDMS HEW 4/15/2020 Abandon Date 3/17/2020 HEW xGDSR-4/15/2020DLB 4/16/2020 MGR24APR20 SFD 4/16/2020 If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost - Base Formation at total depth: Contact Name:Mclaughlin, Sean M Contact Email: Sean.McLaughlin@bp.com Authorized Name:Lastufka, Joseph N Authorized Title:SIM Specialist Authorized Signature with Date:Contact Phone: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. 9672' 9882' 9921' 10135' 8740' 8929' 8964' 9158' Sadlerochit - Zone 4 CGL - Zone 3 Base of CGL - Zone 2 Zone 1 Zone 1 28.CORE DATA Conventional Core(s) Yes …No 5 Sidewall Cores Yes …No 5 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. Well Tested? Yes … 10135'9158' Top of Productive Interval 9672'8740' Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered): NAME MD TVD Permafrost - Top No 5 31. Summary of Pre-Rig Work, Summary of Daily Drilling Reports, Wellbore Schematic DiagramList of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Joseph N Lastufka Digitally signed by Joseph N Lastufka Date: 2020.04.14 17:05:55 -08'00' ACTIVITYDATE SUMMARY 1/3/2020 ***WELL FLOWING ON ARRIVAL*** (Pre CTD) RIG UP SWCP 4516 FOR GAS LIFT CHANGE OUT. ***JOB IN PROGRESS, CONTINUED ON 1/4/20 WSR*** 1/3/2020 T/I/O=1000/1700/50 temp=SI LRS unit 46 assist SSL freeze protect (CTD) Road unit to location/PJSM/ RU to tree cap *** WSR continued on 01/04/20*** 1/4/2020 *** WSR continued from 01/03/20*** LRS unit 46 assist SSL freeze protect (CTD) Pumped 5 bbls 60/40 followed by 60 bbls crude down FL to Freeze Protect. Pumped 1 bbl 60/40 followed by 58 bbls crude down TBG to Freeze Protect.. CV's= OTG Tag hung on WV.FWHP=650/1700/50 SSL in control of well upon LRS departure. 1/4/2020 ***CONTINUED FROM 01/03/2020 WSR*** (Pre CTD) SET 5-1/2" SLIP STOP CATCHER SUB AT 6,639' SLM. PULL RK-OGLV FROM ST#6 (6,588' MD), RK-LGLV'S FROM ST#4 (5,491' MD) & ST#1 (3,212' MD). SET RK-DGLV'S AT ST#1 (3,212' MD) & ST#4 (5,491' MD). SWCP 4516 CURRENTLY ON WEATHER HOLD DUE TO LOW TEMPERATURE. ***JOB IN PROGRESS, WILL CONTINUE JOB WHEN WEATHER PERMITS*** 1/7/2020 ***CONTINUED FROM 1/4/2020 WSR*** (Pre CTD) CURRENTLY STANDING BY ON PUMP TRUCK & FLUIDS FOR 350 BBL IA LOAD. ***JOB IN PROGRESS, CONTINUED ON 1/8/2020 WSR*** 1/7/2020 T/I/O= 1175/1300/30 Temp= SI LRS unit 42 Assist Slickline (Load & Test) RIg up to IA & Pressure test. Job postponed. SSL in control of well @ departure. FWHP= 1500/1500/30 1/8/2020 T/I/O=1350/1350/30 Temp= S/I ( LRS Unit 42 Assist Slickline w/ MIT-IA/CTD) Loaded IA with 5 bbls 60/40 and 320 bbls 120* crude. MIT-IA ***PASSED*** to 2628 psi. Pumped a total of 12.45 bbls crude to achieve max applied PSI of 2750 with a target psi of 2500. 1st 15 min IA lost 69 psi. 2nd 15 min IA lost 17 psi for a total of 86 psi in 30 min. Bled back 6.3 bbls crude. AFE sign hung, Tag hung on IAC. SSL in control of well @ departure. FWHP= 1890/300/29 1/8/2020 ***CONTINUED FROM 1/7/2020 WSR*** (Pre CTD) LRS LOADED IA W/ 320 BBLS OF CRUDE. SET RK-DGLV AT ST #6 (6,588' MD). LRS PERFORMED SUCCESSFUL IA ASSURANCE TEST TO 2628 PSI. PULL EMPTY 5-1/2" SLIP STOP CATCHER SUB FROM 6,639' SLM. CURRENTLY RIH W/ 3.70" x 20' DUMMY WHIPSTOCK TO 9,810' MD. ***JOB IN PROGRESS, CONTINUED ON 1/9/20 WSR*** 1/9/2020 ***CONTINUED FROM 1/8/20 WSR*** (Pre CTD) DRIFT TO OT BWD PKR W/ 3.70" x 20' DUMMY WHIPSTOCK AT 9,780' SLM / 9,810' MD. ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** 1/25/2020 ***WELL S/I ON ARRIVAL***(pre tree c/o) PARTIALLY RIG UP SWCP 4522 ***MOVE TO WEATHER TICKET*** Daily Report of Well Operations PBU 03-35 Daily Report of Well Operations PBU 03-35 1/31/2020 ****WELL S/I UPON ARRIVAL**** (Pre CTD) RAN 5-1/2" BRUSH, 4.54" G-RING TO SVLN @ 2,240' MD SET 5-1/2" PRQ DSSSV PLUG IN HRQ SVLN @ 2,220' SLM / 2,240' MD PURGED CONTROL & BALANCE LINES HYDRO LRS PERFORMED PASSING MIT-T (See LRS log) STANDBY FOR RDMO DUE TO WIND CHILL ****MOVE TO WEATHER TICKET**** 1/31/2020 T/I/O=1930/0/0 Temp=SI Assist SL (CTD) MIT-T PASSED to 2584 psi. Loaded Tbg. w/ 2 bbls 60/40, 263 bbls Crude. S-Line set plug. Pumped 3.9 bbls Diesel down Tbg to reach test pressure. Loss of 9 psi 1st 15 min. Loss of 3 psi 2nd 15 min. Bled down Bled back 3.5 bbls FWHP=300/0/0 2/1/2020 ****CONT. JOB FROM 1/31/20**** (Pre CTD) SLB SLICKLINE SWCP 4522 RDMO ****WELL LEFT S/I & DSO NOTIFIED OF STATUS UPON DEPARTURE**** 2/21/2020 T/I/O=250/0/0 Set 5" FMC IS-A BPV #537 through tree, pre tree replacement. Performed LTT on BPV... Pass. FWP's BPV/0/0 see log for details. 2/22/2020 T/I/O=BPV/0/0. Tree replacement. RD 5x5 FMC tree. RU new Cameron 5x5. Torqued to API spec. Pulled 5" ISA BPV #537 @ 130". Set 5" ISA TTP #527 @130". PT 5x5 Cameron tree to low 300psi and high 5000psi for 5 min ea. Passed. Pulled 5" ISA TTP #527 @130".Pt tree cap to 500 psi. Pass. Job Complete. See log. Final WHP,s 200/0/0. NOTE: AOGCC Test required within 5 days of POP due to component change out. 2/23/2020 ***WELL S/I ON ARRIVAL*** PULLED PRONG & PRQ-DSSSV PLUG BODY FROM 2240' MD DRIFTED TO 9810' MD W/ 20'x3.70" DUMMY WHIPSTOCK (no issues) ***WELL S/I ON DEPARTURE*** 2/24/2020 ***WELL SHUT IN ON ARRIVAL*** SET 7" BAKER DELTA WS, TOWS AT 9706', 30 DEG LOHS, CCL TO TOW=20.0', CCL STOP AT 9686'. RDMO E-LINE ***JOB COMPLETE, DSO NOTIFIED*** 3/6/2020 CTU #9 1.75" coil 0.156WT Objective: Mill XN and windown Pre CTD MIRU, AOGCC unwitnessed bop test ***In progress*** 3/7/2020 CTU #9 1.75" coil 0.156WT Objective: Mill XN and windown Pre CTD MIRU, AOGCC bop test complete (witness waived). MU Left handed milling assembly with 3.80" round nose parabolic mill for XN @9335'. 3hrs NPT for the levelwind not working before we RIH. ***In progress*** 3/8/2020 CTU #9 1.75" coil 0.156WT Objective: Mill XN and windown Pre CTD Load well with slick 1%KCL w/safelube prior to rih with Left hand milling assembly. Mill XN Nipple to 3.80" ID and dry drift with 3.80" stabilizer, POOH. Make up Window milling BHA with 3.80" diamond window mill and 3.79" diamond string reamer. Tag Whipstock and begin milling window. ***In progress*** Daily Report of Well Operations PBU 03-35 3/9/2020 CTU #9 1.75" coil 0.156WT Objective: Mill XN and windown Pre CTD Continue milling window. Mill window from 9698.1 to 9706.3 CTM (9711-9720 MD). Mill 10' of rathole to 9716.3' CTM (9730 MD). Backream through window at 1 fpm (2x's). Dry drift to 9716.3'. FP coil and well with 58bbl. POOH to gauge the mill/reamer. Mill gauged 3.80" and reamer gauged 3.78". Blow down reel fpr pipe swap and RDMO. ***Job Complete*** 3/11/2020 T/I/0 = 200/0/0. Set 5" ISA BPV #538 @140" w/ Lubricator 839. RDMO. ***Job Complete***. 3/12/2020 T/I/O = BPV/0/0. RD SSV, RU SMV and uppermost tree, RU Target 90. RU 839 Lubricator, PT'd against MV 350/5000 PSI (Pass) Charted and Retained. PT'd against SMV & SV 350/3500 PSI (Pass) Charted and Retained. Pulled 5" ISA BPV @140". RD Tree cap assy, RU 5x7 XO w/ 7" tapped blind, PT'd against SV 350/3500 PSI (Pass) Charted and Retained. RDMO. ***Job Complete***. FWPs = 200/0/0. MV=O, SMV/SV/WV/Target 90=C, IA/OA=OTG.                   !"! # !$  %  &'&(( )%     1 2 3  &/% ( 4)%  &  5&('&'++''(6 3  7  3 ! % 8898/2!82'*+    ) 4:5/47;# < 6    $  3 ';'( 0   %  #47;$ )  7= % 7   ;!   7"7 #$ %   7 &'&((  892 896!>  89 %0 !6 ('( " /  0! 6 896!>"8/ 2"!!8 !8/ 2 9688"8 /  !6!> 89/ ?68" 2% 8> % 89  / 6!>8%% 8896!%2! 0 !!0  2!6 !!% 8896!%2 !> %"!86!%2/ @@ 89%'+" @@ ,/'+'(    892 892 ! " !29" 892"8 89"%6  >>.!!26 >> 86%8  6!> 8! */'+   &'5&(( !2 892 8! 9 !>> 28%?!8  !00!8?! 8!AA.8?!   >8 >>%" ! B2 02"2 088" "!%"!680!% !*8.9!!%/ 5/5   !2 ! %!9 928%8/ (&8/ 88>%C!9 8! 286!%/ '8 >. 8 .+.'  %  (8%&" . '.'.'.*   2 #( &DE$.8F'..(. '  *2 8&8/8F(.(. (. (.'/08! (.9 %C/ / '5.'.''  5> #( &DE$.,.+.'.>( ,! 8&8..5.D.>'  D"!.  +2 # '&(E$.'.* '> # '&(E$.(. 5/'(5     ) 'D(6*&'&((                   !"! # !$  %  &'&(( )%     1 2 3  &/% ( 4)%  &  5&('&'++''(6 3  7  3 ! % 8898/2!82'*+    ) 4:5/47;# < 6    $  3 (;'( 0   %  #47;$ )  7= % 7   ;!   7"7 #$ %   7 !2 6!> 8 .8% 889 8 /   890!! . 0!  2"%89/ 8"80!/  2 0!%2B!%C! 8.9!!%/ %!00 2 / /''(   !2  !8 2%!% > 9!!268/  >/ /''   !2 8 2!62%/ 82%266!"" !29"'.( !2!89 / !. !2"%/ !"!%"( 89>% 8%  8" 2%8" 8 !C / (/'D'   !2 2"% ?60! 2"%89/ 2,8!8.!6>'.6>(/5' 8!/ 26'6!"/ 26(+"%'G 6/5,88&''0 26*"(>9 / 26*%86!%8'/ 26(0 "  26'+(62%/ ! >6%  2 8 89"8>8"(> "8 00'D8/ !2689% 2 9!! 8!6%8/%!88 682/ 8!"!2 8"" 926 89"!02 !!(/' !08%2 89""!2 / 26'/6'8.  2 0!'80 * 26%/ !%26%!!8 89 26 2!6%!!(D !" 2 / 8"! */68&/D5 !2/./68&/(6!2./68& /6!2 %82 28"!%%9  !0!  %/ !%26'6%!6% 8"8  89%86!%8 !! >"% 2  !6892%2 892"%! 8! %0!2%"!8!8!% 0 !626.! 8!%% 2%8 2 !68922 !028%89/ 5/'D     ) 'D(6*&'&((                   !"! # !$  %  &'&(( )%     1 2 3  &/% ( 4)%  &  5&('&'++''(6 3  7  3 ! % 8898/2!82'*+    ) 4:5/47;# < 6    $  3 ;'( 0   %  #47;$ )  7= % 7   ;!   7"7 #$ %   7 &',&(( !2 26%86!%8 ! " !29">>"8 ?60! 2"%898" !!689  26*%86!%8'/ 8'((86 26(0 "  26'5*62%/8'558&0** 8  %2 !'626(!0 %86!%8! 08('8& 0''8 !0! '"!2 89"!02 " !29"6%88"" 926/ !2689% 2 % !88682/ 8!"!2 8"" 926 89"!02 !!D! 08%2 89""!2 / 8"! 8 289!2 !"89  !89' (" 2 9 8 !89 % 89 2 88%/ 0!"!! !6228%"!008 %2 89'"!2 !!0%86!% /,*   % 8 +.,5/ 8" 6228%"F' 89"! 02"86892"! 8 !H*"89"!02 2689%!88/ 88?! !  8" /+,68&/5D6!2 !89* *" @! 8 8!,"! 8 8"!.!80C!%%2! 88%% 8!80!9  / DI!8 !+"/ +I8"26.26'6 %!%-922/ (/,5*  !%' % 8 +.,5/ 8 8%"0 !6+5(I ! J*,I/ 89"9+,((I/ 82(0% 8926!(/6 %!% C!% 8.08 !89/ 82% C98/  % 8890 !6+,(I/ /+5  !%'   ) 'D(6*&'&(( 6WDUW $ THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Sean McLaughlin Engineering Team Leader BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 03-35 Permit to Drill Number: 191-080 Sundry Number: 319-542 Dear Mr. McLaughlin: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 Wa .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, J re y rice Chair DATED this b day of December, 2019. 3BDMS ^j DEC 0 91019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 NOV 2 9 2mq 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ T _ O v uEdoNn ❑ &Ars Suspend Perforate ❑ ❑ Other Stimulate ❑ Pull Tubing ❑ ///LLL���a(gdlp 8(p_y+� gram ❑ Plug for Redrill 0' Perforate New Pool ❑ Re-enter Susp Well ❑ After -Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development p• 5. Permit to Drill Number: 191-080 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22184-00-00 ' 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? B. Well Name and Number: Will planned perforations require a spacing exception? Yes ❑ No Q PBU 03-35 ` 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028327 8 028332 PRUDHOE BAY. PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10211 9227 9880 8927 2314 9880.9930 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 34-114 34-114 1490 470 Surface 3720 13-3/8" 34-3753 34-3485 3450 1950 Intermediate 1 9620 9-5/8" 31 -9652 31 -8722 6870 4760 Production Liner 868 7" 9339- 10207 1 8442-9223 1 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9674-9950 1 - 8990 5-12" n# x 4-i2" 12.6# / 3-i2" 9.3# 13Cr80 29 - 9347 19810 - 9824 Packers and SSSV Type: s12" Baker SB -M Packer Packers and SSSV MD (ft) and TVD (ft): 9311 /8417 3-1/2" Otis BWD Packer 9810/8864 12. Attachments: Proposal Summary 0 Wellbore Schematic p 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ® Exploratory ❑ Stratigraphic ❑ Development p' Service ❑ 14. Estimated Date for Commencing Operations: January 1, 2020 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended 21 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Sperry, Nathan be deviated from without prior written approval. Contact Email: Nathan.Sperry@bp.cem Authorized Name: McLaughlin, Sean M Contact Phone: +1 907 564 4258 Authorized Title: Eng' eenng Team Leader- CTD Authorized Signature: Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test L9" Mechanical Int//e��grity Test ❑ Location Clearance ❑ Oth r: '� {' '"" iv.» Rls� .►`Jl��✓�sC�.:e., Post Initial Injection MIT Req'd? Yes ❑ No ❑//- Spacing Exception Required? Loi No ® Subsequent Form Required �^ 4/6 /1 APPROVED BYTHE Approve tl b � � COMMISSIONER COMMISSION Date o 1 -Ju (24h'W ORIGINAL ofi;�,e Approved application is valid for 12 months from the date of approval. ABDMSL121''DEC 0 9 2019 Form 10-403 Revised 04/2017 '- 12 -tl � Submit Form and Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry - CTD Engineer Date: November 26, 2019 Re: 03-35 Sundry Approval Request Sundry approval is requested to plug off the 03-35 production as part of the drilling and completing the proposed 03-35A coiled tubing sidetrack. History of 03-35 03-35 was originally completed in 1991 and worked over in 2000. 03-35 is marginally competitive. Proposed plan for 03-35A The sidetrack will be a -2710' horizontal CST that will kick -out from the 03-35 parent. The CST will establish MIST offtake in the toe and re-establish parent production in the heel. The sidetrack will be drilled on or around February 2020. During pre -rig work, it is proposed to seta_4-1/20 x 7" whipstock at a kickoff depth of -9710' MD and mill a 3.80" window. The rig will move in, test BOPE, kill the well, and drill into Zones 4, 3, and 2. The proposed sidetrack will be completed with a 3-1/4" x 2-7/8" 13Cr-80 solid liner and cemented in place. This Sundry covers plugging the existing 03-35 Production via the liner cement iob or liner too packer, if the liner lap pressure test fails (alternate Plug placement per 20 AAC 25.1126)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre -Rig Work (scheduled to begin January 2020) 1. 1 F MIT -T. MIT -IA 2. S DMY GLVs, Drift for whipstock. 3. EL Set whipstock at 9710' MD 4. C Mill XN to 3.80". Mill window and 10' of rathole. . TA, - S 5. V Pre -CTD Tree work. SL7Akii.� 364-s''Y2 Rig Work (scheduled to begin Feb 2020) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2461 psi). 15r.4 -r6- 2. Drill production section: 4.25" OH 3. Run 3-1/4" x 2-7/8" liner to TD. 4. Pump primary cement job: 41 bbls, 15.3 ppg Class G, TOC at TOL ('"9300' MD)*. 5. Freeze protect well to a min 2,200' TVDss. 6. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. V: Valve & tree work 2. SL/FB: Set LTP if needed. PT LTP. Set KO GLD. 3. E: Perforate -10' 4. C: Perforate "'100' Nathan Sperry CC: Well File CTD Engineer Joe Lastufka 564-4258 IV PT)ts The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling operation. Window Milling Fluids Program: A min EMW of 8.4 ppg KCL ('434 psi overbalance). KCI will be used as the primary working fluid and viscous gel sweeps will be used as necessary to keep the hole clean. The well will be freeze protected with a non -freezable fluid (typically a 60/40 methanol/water mixture) prior to service coil's departure. Additionally, all BHA's will be lubricated and there is no plan to "open hole" a BHA. Disposal: • All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. Hole Size: • The window and 10' of formation will be drilled with a 3.80" OD mill. Well Control: • BOP diagram is attached. • AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a representative of the commission can witness the test. • Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and 4,000 psi. • BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System) and will provide the results to the commission in an approved format within five days of test completion. • BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals thereafter. • 10 AAC 25.036 c.4.0 requires that a BOPE assembly must include "a firewall to shield accumulators and primary controls". A variance is requested based on the result of the joint hazop with the AOGCC. For our operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit, and the accumulators are located on the backside of the Operations Cabin (opposite side from the well). These are approximately 70' from the well. Hazards: DS 03 is an H2S pad. Recent recorded H2S reading on 03-35: 160 ppm on 5/2/2019. Max H2S recorded on the pad: 1100 ppm. Reservoir Pressure: The reservoir pressure on 03-35A is expected to be 3409 psi at 8800' TVDSS (7.45 ppg equivalent). Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2529 psi. A min EMW of 8.4 ppg for this well will provide 434 psi overbalance to the reservoir. Nathan Sperry CC: Well File CTD Engineer Joe Lastufka 564-4258 FMC VVIELLFEAD= FMC ACTUATOR= AXELSON KB. E1F/ = ..._ _ 60' BF. ELEV - - _' KOP= 800' Max Angle 28° @ 7600' Datum MD= - 980V Datum TVD= 881HY-SS Minimum ID = 2.750" @ 9821' 3-1/2" OTIS XN NIPPLE 13=4-892" I -i 931W 03-35 S— S5 SAFETY NOTES: CHROME LINER & TUBING I5-112" OT RQ SSSV NP, D = 4.562" 4f-c�11McMUIZFAY GAS LFT MANDR LS ST MD TVD DEV TYPE VLV LATCH FORT CIATE 1 3212 3002 28 FMFLO CO w 16 08119/10 2 4142 3832 27 FMHO DMI' RK 0 07/14/95 3 4902 4510 27 FMI-10 DAM RK 0 07/25/91 4 5491 5035 28 FAA -10 DOME RK 16 08/19/10 5 6040 5521 28 FMD DAM RK 0 07/25/91 6 65M 6007 27 FMiO SO RK 28 08/19/10 7 7217 6563 28 FM HD DW RK 0 07/25/91 8 7718 7006 28 FMiO OMY RK 0 08/19/10 9 8310 75301 28 RA -10 OW RK 0 10/02/95 10 8764 7932 28 F"k) DAT/ RK 0 07/25/91 11 9048 8183 27 FMiO DAM RK 0 07/2.5/91 12 9203 8320 27 1 F mHO I R(Mi RKP 0 07/25/91 9314Y I 5-1l2LOCSEALASSY 9311' 9-5/8" X 5-1/2" BKR S5 -3A PKK D = 6. 9325' 75/8'MLLOIIr EX7BVSION, D=6-26" PERFORATION SLIMMNRY REF LOG: I IES13JSW ON 07/05/91 ANGLE AT TOP FERF: 26-@9674- 6"@9674'Note: :11,9330'�-7F-5/8'X5-112-XOID=4.892. SIZE SPF NFHNAL 9331' 5412" x 4-12' XO, ID = 3.958" SHOT SOZ 33/8" 9335' 4-12" OTIS XN NP, D= 3.725" TOP OF 7' LNR 9339' O 08/06191 PEiF CORRIrl ION )pf, ID - 3.958" F 9347 4 9744-9799 O 08/06/91 RCT/PJC PXN PLUG PULL (08/05/08) 2-1/2" 9347" 4-12" L4A_EG. D = 3.958" PERFORATION SLIMMNRY REF LOG: I IES13JSW ON 07/05/91 ANGLE AT TOP FERF: 26-@9674- 6"@9674'Note: Note,Refer to Production DB for historical perf data SIZE SPF NFHNAL Opn/Sqz SHOT SOZ 33/8" 4 9674-9730 O 08/06191 PEiF CORRIrl ION 3318" 4 9744-9799 O 08/06/91 RCT/PJC PXN PLUG PULL (08/05/08) 2-1/2" 4 9626 - 9832 O 01/21/94 2-1/2" 4 9840-9068 O 0121194 2-518" 1 9888-9896 S 07/13/92 11117!03 2-1/8" 1/2 9944- 9950 C 02/21/92 TBG, 9.2#, 13CR FOX, .0087 bpf, D= 2.992" -1 9824' PBTD(TAGGED 09/17/94)9964' ELM ® 10160' LNR 298, L -80/13 -CR .0371 bpf, D = 6.184" 10207" j 9810' 1-17" X 3112" OT BWD FKR 9621' 3-1/2" OTI.S XN NP, D = 2.75" 9823' 3-1/2" VVLEG, D = 2.992" 9822' ELMD TT LOGGED 08/03/91 9880' CEM3df TOP (11/17/03)-] 9920' TOP OF RIVER SAND (11116/0 9930' 2-1/2"BP (11/15!031 DATE REV BY COMMENTS DATE REV BY COMMENTS 07108/91 INITIAL COMPLETION 04/28/08 JRA/SV PX PLUG RALED (04/27108) 07/27191 RWO 0825/10 RERNAGE GLV CIO (08/19110) 11/16/03 DBM'TLP CMT & SAND TOPS, SET BP 11/12113 HWD/ PJ PEiF CORRIrl ION 07/19/06 PJP/PJC PXNPLUGSEr(05118/06) 1121/13 PJC REFORMAT 08/10/06 RCT/PJC PXN PLUG PULL (08/05/08) 03/18/08 JlM TLH PX PLUG SET (Gall 1106) PRUDHOE BAY UNIT WELL 113-35 PERMIT W. '1910800 An No: 50-029-2218400 SEC 11, TION, R15E, 1844' FSL & 701' FWL BP Btploration (Alaska) `HEAD= FMC, PROPOSED JATOR= VLVILATCHI 9311' :LEY=_— 6d REV 2 3212 3002 28 FM -10 DOKE 800. 16 kwle = —' 2 4142 3832 nMID c _•CONDUCTOR —�- 13-3/8" CSG, 68#, L -80M-55, D= 12.415' 3753' Minimum ID = 2.7606'@ 9821' 3-1/2" OTIS XN NIPPLE TOP OF _LNR 9300' TBG, 17#, 13CR R3, .0232 bpf, D = 4.892" 1-� 9310' 13CR-85 STL, .0087 bpf, D = 2.992' TOP OF T LNR 933W - 4-12" TBG, 12.6#, 13 -CR, .0152 bpf, ID = 3.958" 9347' - 9-5/8" CSG, 47#, L-80, ID = 8.681' 9651' 4-12" X 7" DELTA WHIPS9710' 7" LNR, 29#, 13-0R85, .0371 bpf, ID = 6.184" --9710- 3-1 /4• LNR, 6.6#,13CR-85 STL, .0078 bpf, D = 2.85' 9900' PERFORATION SUMMARY REF LOG: DIESEL/SW ON 07105191 ANGLE ATTOP PERF: '@ LNR, 8.59, 13CR45 STL, PBTD — D 1242W 03-35A I-1 5-12" OT RQ SSSV NIP, ID = 4.562" McM1RRAY GAS UFf MANDR13-S ST MD TVD DEV TYPE VLVILATCHI 9311' PORT DATE 1 3212 3002 28 FM -10 DOKE RK 16 08/19/10 2 4142 3832 27 FMiO DMY RK 0 07/14/95 3 4902 4510 27 FM10 0MY RK 0 07/25/91 4 5491 5035 28 FMKI DOLE RK 16 08/19/10 5 6040 5521 28 FMiO DMI' RK 0 07/25/91 6 6588 6007 27 FMiO SO RC 28 08/19/10 7 7217 6563 28 FMiO DMY RK 0 07/25/91 8 7718 7006 28 FM IO DMY RK 0 08/19/10 9 8310 7530 28 FMiO DMY RK 0 10/02/95 10 8764 7932 28 FMiO DMY RK 0 07/25/91 11 9048 8183 27 FMiO DMY RK 0 07/25/91 L1219203 83201 27 1 FMiO I RKED1 RKP 007/25/91 8300' 3.70• DEPLOYMENT SLV, D =3.00• COMMENTS 3-12' XNIP, D=2.813" 9310' 5-12"LOCSEALASSY 9311' 9-5/8"X5-1/2"BKRSB-3APKR,ID=600" 8320' 3-12• X 31/4" XO, D = 2.786" 9325' 7-59" MILLOUT EXTENSION, I1)=6-26" 9330' 7 -5/8"x5 -12"X0, I0=4.892" 9331' 5-12" X 4-12"x0, D = 3.958" 9335' 4-12" OTIS XN NIP, ID = 3.725" -12" WLEG, D = 3.958" i ELMD TT LOGGED 02/13/03 MLLOUT WINDOW (03-35A) -_ DATE REV BY COMMENTS DATE REV BY COMMENTS 07108191 INITIAL COMPLETION 07/27/91 RWO 072791 RWO 11!18/19 JMD BUILT PROPOSED 11118/19 .AMD BUILT PROPOSED REV 1126119 .MAO BUILT PROPOSED REV 2 3-1/4" X 2-79' XO, D = 2.377" PRUDHOE BAY UNIT WELL: 03-35A PERMri No: API No: 50-029-22184-01 T10N, R115E,1844' FSL & 701 BP Exploration (Alaska) owl .x�a.e. so ri opn Top wc. sme, wm�e� 1Op C PUMP l i 9L8 CT PWM t, I Returns Tank Farm ._._._._--------- I Sauna Water Tank Farm _ I I _ _ _------- _,-- I � I I I I I I I I _ I I I Choke Manifold I L. ...... ............ .i .x�a.e. so ri opn Top wc. sme, wm�e� 1Op C PUMP l i 9L8 CT PWM t, I Returns Tank Farm ._._._._--------- I Sauna Water Tank Farm _ I I 0 00 1 Y, M M Z D J QO m UJ d O + W 2 O Qo C=' u a = o Q a` d Co T W :E O p C 0 Y a N fC i O Q K W a m Barrels of Oil per Month or Barrels of Water per Month 0 I ♦� -, 5n I u 0 0 • 0 s 0 0 0 0 00 o 0 0 c 0 0 0 0 m E E I ♦� -, 5n I u s e • 0 s 0 0 0 0 0 o a a _ � 41 a 0 .'n • -' ° a • 0 0 0 0 0 s 0 0 0 0 0 o oNea 110 -seg ao y;uow .iad („j:)W„) seg }o;aa j 3Ign:) puesnoyl Q Sundry Application Plug for Re -drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re - drilled. Those wells that are not re -drilled immediately are identified every 6 months and assigned a current status of"Suspended." Task Res onsible reviewer will check to ensure that the "Plug for Redrill" box Geologist 7The r left corner of Form 10-403 is checked. If the "Abandon" orboxes are also checked, cross out that erroneous entry and both copies of the Form 10-403 (AOGCC's and operator's 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then/ Jit on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engin€ers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re -drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts Pages: [] Poor Quality Original - Pages: Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED .[]- Logs-of vadous kinds . . Other COMMENTS: Scanned by: Dianna Vincent Nathan Lowell TO RE-SCAN Notes: · Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: Is~ 4 u«+,: vcmm+x ;rx, xzr., �,. ;,• - e m, ^° ms: . 4,aq :...._ .. c 4; -.. ,z'.,� :. A » R+:. , «. ;+ia , w ; 94..'r,.._ 'a, $ ..zrv; . +,.. « . - -• v • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 \C\ S December 30, 2011 o Mr. Tom Maunder Alaska Oil and Gas Conservation Commission i, k 702 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of DS -03 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, 1i{ F EB 9,' ?Cj Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS -03 10/26/11 Corrosion Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/ Well Name PTD # API # cement pumped cement off date inhibitor sealant date ft bbls ft gal 03 - 1750750 50029200930000 Sealed conductor NA NA NA NA NA 03 -02 1760240 50029202030000 Sealed conductor NA NA NA NA NA 03 -03 1760390 50029202110000 Sealed conductor NA NA NA NA NA 03 -04 1760510 50029202180000 Sealed conductor NA NA NA NA NA 03-05 1760570 50029202220000 Sealed conductor NA NA NA NA NA 03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA 03 -07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA 03 -08 1760730 50029202310000 Sealed conductor NA NA NA NA NA 03 -09 1790220 50029203620000 Sealed conductor NA NA NA NA NA 03-10 1790210 50029203610000 Sealed conductor NA NA NA NA NA 03 -11 1790470 50029203830000 Sealed conductor NA NA NA NA NA 03 -12 1790580 50029203920000 Sealed conductor NA NA NA NA NA 03 -13 1790710 50029203990000 Sealed conductor NA NA NA NA NA 03-14B 2090020 50029204070200 Sealed conductor NA NA NA NA NA 03 -15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA 03 -16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA 03 -17 1791020 50029204200000 Sealed conductor NA NA NA NA NA 03 -18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA 03 -19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/31/2010 03-20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010 03 -21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/3/2010 03 -22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/26/2011 03 -23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/18/2011 03-24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/162010 03 -25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/17 /2011 03 -26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 8/2/2010 03 -27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/17 /2011 03 -28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17 /2011 03 -29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010 03-30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010 03-31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010 03-32B 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010 03-33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010 03-34B 2000110 50029211320200 0.2 NA 0.2 NA 9.4 10/26/2011 --)II> 03-35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/282010 03 -36A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010 03 -37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 8/2/2010 . 1. Operations Performed: OtherOOSet TTP Abandon 0 Repair WellŒ Plu¡:¡ PerforationsD Stimulate 0 Alter Casing 0 Pull TubingD Perforate New Pool D WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate D Re-enter Suspended WellD 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development [!] ExploratoryD 191-0800 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicD ServiceD 50-029-22184-00-00 7. KB Elevation (ft): 9. Well Name and Number: 60.00 03-35 8. Property Designation: 10. Field/Pool(s): ADL-028332 Prudhoe Bay Field / Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 10211 feet true vertical 9227.0 feet Plugs (measured) 3-1/2 TTP set @ 9821 (08/10/2006) Effective Depth measured 9880 feet Junk (measured) true vertical 8927.0 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 30 - 110 30.0 - 110.0 1490 470 SURFACE 78 13-3/8" 68# K-55 29 - 107 29.0 - 107.0 3450 1950 SURFACE 3646 13-3/8" 68# L-80 107 - 3753 107.0 - 3484.0 4930 2270 PRODUCTION 9626 9-5/8" 47# L-80 26 - 9652 26.0 - 8722.0 6870 4760 LINER 775 7" 29# 13Cr80 9339 - 10114 8442.0 - 9139.0 8160 7020 LINER 93 7" 29# L-80 10114 - 10207 9139.0 - 9223.0 8160 7020 Perforation depth: Measured depth: 9674-9730,9744-9799,9826-9832,9840-9868, 9888-9896, 9944-9950 ,.··~'·Þ,~\M1¡;.;~ l <I ~\LH.r-\.L\ _:~t~,c:n~-J r; ¿ True vertical depth: 8742-8792,8805-8854,8878-8884,8891-8916, 8934-8941, 8985-8990 Tubing ( size, grade, and measured depth): 5-1/2" 17# 13Cr80 @ 25 - 9331 4-1/2" 12.6# 13Cr80 @ 9331 - 9347 3-1/2" 9.2# 13Cr80 @ 9810 - 9824 Packers & SSSV (type & measured depth): 9-5/8" Baker SB-3A Packer @ 9311 7" Otis BWD Packer @ 9810 5-1/2" Otis RQ SSSV Nipple @ 2240 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RBDMS BFL 0 CT 032006 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 57 0 12725 --- 249 Subsequent to operation: 103 0 7045 --- 672 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ ServiceD Copies of Logs and Surveys run _ 16. Well Status after proposed work: Daily Report of Well Operations _ ~ OilŒ] GasD WAG 0 GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr N/A Printed Name DeWaYlle R. Schnorr ~ Title Petroleum Engineer Signature ~.'JI ¿P ~ I..... V Phone 564-5174 Date 9/28/06 .'\ I Form 10-404 Revised 4/2004 Ut"\ lJll\lJ-\L . RECEIVED STATE OF ALASKA . "EP 2 9 2006 ALASKA Oil AND GAS CONSERVATION COMMISSION ~ REPORT OF SUNDRY WELL OPERA'ftONSas Cons. Commission . . 03-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 08/11/2006 BLEED OFF 300# FROM TUBING 1820# TO 1520# TO TEST PX PLUG SET. GOOD TEST. *** TURN WELL OVER TO DSO *** 08/10/2006 ***WELL SI ON ARRIVAL*** (wco/rate) T=200, IA=1800, OA=150 SET 3.5" PXN (2.81 ) 4 x 3/16" PORTS, 96" PRONG, 1.75" FN @ 9811' SLM *** JOB IN PROGRESS *** 08/05/2006 MADE SEVERAL ATTEMPTS TO PULL PXN PLUG BODY. RAN A 5' - 2 1/4" PUMP BAILER WITH A BALLI SNORKEL BOTTOM. RECOVERD 2.81 "PXN" PLUG BODY, NOTE: ALL PACKING & MIDDLE FIBER ISOLATION RING LEFT IN THE HOLE, ALSO FOUND WHAT APPEARS TO BE TRACE AMOUNTS OF CARBO LITE IN THE PLUG BODY & GS *** WELL LEFT S/I *** DSO NOTIFIED OF WELL STATUS 08/04/2006 *** WELL SHUT IN *** (pull / set ttp) RIGGED UP BRAIDED LINE. MADE SEVERAL ATTEMPTS TO TRY AND PULL 31/2" PXN PUG BODY @9,775' BLM. ****JOB STILL IN PROGRESS**** 08/01/2006 LRS PUMPED 250 BLS CRUDE, MADE SEVERAL ATTEMPTS TO PULL PXN PLUG BODY @ 9803' SLM W/ .125 WIRE, 8' x 2-5/8" STEM, 2-1/8" OIL JARS, LONG STROKE SPANGS. LAY EQUIP DOWN FOR NIGHT-NO NIGHT CREW ***WELL LEFT S/I*** 08/01/2006 T/I/O = 1100/ AIL /150 - Load TBG for slickline - (AIL line is shut in) - Pumped 250 bbls 120* crude down tubing. FWP's = 550/ AIL /150 07/31/2006 (c/o ttp) RAN 1.5" BAILER. CAME BACK EMPTY. ATTEMPTING TO PULL 3.5" PXN BODY FROM 9803' SLM. 07/30/2006 ***WELL S/I ON ARRIVAL *** (c/o xn plug) DRIFT WITH 2.80" CENT & S. BAILER. TAGGED PRONG @ 9785' SLM. PULLED PRONG @ 9792' SLM, PACKING CUT ON PRONG. ATTEMPTING TO PULL PLUG BODY. 07/28/2006 T/I/O = 1620/ AIL /150 - Temp = S/I - (AIL line SI) - Load tubing for slickline. Pumped 250 bbls 75* crude down tubing. FWP's = 520/ AIL /140 07/20/2006 T/1/0=2000/2000/180 Temp=SI TBG FL (DSO call in for FP). TBG pressure is > 1800 psi. 07/13/2006 TestEvent --- BOPD: 63 BWPD: 10,661 MCFPD: 4,014 AL Rate: 4,014 05/18/2006 **** WELL SHUT IN **** (d&t set pxn plug) DRIFT & TAG HARD BOTTOM W/2.675 CENTRALIZER, T,E,L, & SAMPLE BAILER TO CORRECTED HARD BOTTOM @ 9,950',PERFS @ 9,674' > 9950' NO RATHOLE, APPEARS ALL PERFS ARE OPEN, SAMPLE BAILER MIT, BRUSHED "XN" NIPPLE @ 9,789' WLM, SET & CK SETTED 2.81 "PXN" PLUG BODY W/ (4) EQULlZING HOLES) @ 9,791' WLM. SET 96" O.AL PRONG WITH 1 3/4" FN @9,784' SLM. RDMO. ****LEFT WELL SHUT-IN**** 05/18/2006 T/I/0=1100/SI/300 Displace TBG Pre-Slickline Work (Flowing on Arrival)(Profile Modification) Pumped 250 bbls Crude intoTBG. Final WHP's=200/SI/250 Page 1 ." . . 03-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 05/11/2006 T/I/O = 300/1850/320. Temp = Hot. TIFL PASSED (Eval high lAP). InitiallA FL @ 7717' (sta #8). SI well, stacked out TBG to 1760 psi. Bled lAP to 860 psi in 3 hrs. TBG increased 30 psi. SI, monitored for 1 hr. No change in pressures or IA FL. Final WHP's = 1790/840/320. **NOTE** Well turned back over to the operator. 05/08/2006 T/I/O= 330/1840/340. ALP= 1840 psi. Temp= Hot. WHP's (eval high lAP) - ALlP. BBLS 6 PT Surface Equipment 250 Crude 256 TOTAL FLUIDS PUMPED Page 2 TREE = WELLHEAD = ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum rvD = FMC FMC AXELSON 60' ? 800' 28 @ 7600' 9806' 8800' SS 113-3/8" CSG, 68#, L-80/K-55, ID = 12.415" I Minimum ID = 2.750" @ 9821' 3-1/2" OTIS XN NIPPLE 15-1/2" TBG, 17#, 13-CR, .0232 bpf, ID = 4.892" 1 TOP OF 4-112" TBG I TOP OF 7" LNR 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" 19-5/8" CSG, 47#, L-80. ID = 8.681" PERFORA TION SUMMARY REF LOG: DIESElISW ON 07/05/91 ANGLEATTOPPERF: 26 @ 9674' Note: Refer to Produetion DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE SEE PAGE 2 FOR PERF BREAKDOWN TOP OF 3-1/2" TBG I 9815' 13-1/2" TBG, 9.2#, 13-CR, .00870 bpf, ID = 2.992" I 9824' I PBTD I 17" LNR, 29#, L-80/13-CR, .0371 bpf, ID = 6.184" I 10160' 10207' DATE 07/08/91 07/27/91 11/16/03 07/19/06 08/10/06 REV BY COMMENTS ORIGINAL COMPLETION LAST WORKOVER DBM/TLP CMT & SAND TOPS, SETIBP PJP/PJC SET PXN PLUG (05/18/06) RCT/PJC PULL 3-1/2" XN PLUG DATE 03-35 SAFETY NOTES: CHROME LINER & TUBING . 2240' -15-1/2" OT RQ SSSV NIP, ID = 4.562" I ST MD rvD 1 3212 3002 2 4142 3832 3 4901 4510 4 5491 5035 5 6039 5520 6 6588 6006 7 7216 6563 8 7717 7005 9 8309 7529 10 8764 7931 11 9048 8183 12 9202 8320 GAS LIFT MANDRELS DEV 1YPE VLV LATCH PORT DATE 28 FMHO RK 27 FMHO RK 27 FMHO RK 28 FMHO RK 28 FMHO RK 27 FMHO RK 28 FMHO RK 28 FMHO RK 28 FMHO RK 28 FMHO RK 27 FMHO RK 27 FMHO RKP 9310' -15-1/2" LOC SEAL ASSY I 9311' 9331' 9335' 9347' 9432' 9810' 9821' 9823' 9822' 9880' 9920' 9930' REV BY COMMENTS -19-5/8" X 5-1/2" BKR SB-3A PKR I -15-1/2" X 4-1/2" XO I -14-1/2" OT XN NO-GO NIP, ID = 3.725" I -14-1/2" TUBING TAIL WI BKR WLEG I H ELMD TT LOGGED 02/13/031 Tïr St.--/;. 0 a po /~OO, . -i7" X 3-1/2" OT BWD PKRI -13-1/2" OT XN NIP, ID = 2.75"1 -13-1/2" TUBING TAIL W/WLEG I H ELMD TT LOGGED 08/03/91 I -1 TOP OF CEMENT -1 TOP OF SAND I -12-1/2" IBP- SET 11/16/031 PRUDHOE BA Y UNIT WELL: "03-35 PERMIT No: '1910800 API No: 50-029-22184-00 SEC 14, T10N, R15E, 1447.11 FEL 925.86 FNL BP Exploration (Alaska) PERFORA TION SUMMARY REF LOG: DIESELlSW ON 07/05/91 ANGLE AT TOP PERF: 26 @ 9674' Note: Refer to Produetion DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DA TE 3-3/8" 4 9674 - 9730 0 08/06/91 3-3/8" 4 9744 - 9799 0 08/06/91 2-1/2" 4 9826 - 9827 0 01/21/94 2-1/2" 4 9827 - 9831 0 01/21/94 2-1/2" 4 9831 - 9832 0 01/21/94 2-1/2" 4 9840 - 9842 0 01121/94 2-1/2" 4 9842 - 9868 0 01/21/94 2-5/8" 1 9888 - 9896 0 07/13/92 2-1/8" 1/2 9944 - 9950 0 02/21/92 DATE 07/08/91 07/27/91 11/16/03 07/19/06 08/1 0/06 RBI BY COMMENTS ORIGINAL COMPLETION LAST WORKOVER DBM/TLP GMT & SAND TOPS, SETIBP PJP/PJC SET PXN PLUG (05/18/06) RCT/PJC PULL 3-1/2" XN PLUG DATE 03-35 . RBI BY COMMENTS PRUDHOE BA Y UNIT WELL: 'ó3-35 PERMIT No: '1910800 API No: 50-029-22184-00 SEC 14. T10N. R15E, 1447.11 FEL 925.86 FNL BP Exploration (Alaska) STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION' REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon D Alter Casing D Change Approved Program D 2. Operator SuspendD Repair WellD Pull Tubing D Operation Shutdown D Plug Perforations[!] Perforate New Pool 0 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time Extension D Re-enter Suspended WellD 5. Permit to Drill Number: 191-0800 Name: BP Exploration (Alaska), Inc. Exploratory D Service D 6. API Number 50-029-22184-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Development [!] Stratigraphic 0 9. Well Name and Number: 03-35 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool 60.00 8. Property Designation: ADL-0028332 11. Present Well Condition Summary: Total Depth measured 10211 feet true vertical 9226.9 feet Plugs (measured) Junk (measured) None Effective Depth measured 9914 feet true vertical 8957.5 feet OtherD 9930 Casing Length Size MD TVD Burst Conductor 80 20" 91.5# H-40 30 110 30.0 - 110.0 1490 Liner 775 7" 29# 13CR80 9339 - 10114 8441.8 - 9138.6 8160 Liner 14 3-1/2" 9.2# 13Cr80 9810 - 9824 8863.8 - 8876.4 10160 Liner 93 7" 29# L-80 10114 - 10207 9138.6 - 9223.3 8160 Production 9626 9-5/8" 47# L-80 26 - 9652 26.0 - 8722.1 6870 Surface 78 13-3/8" 68# K-55 29 107 29.0 - 107.0 3450 Surface 3646 13-3/8" 68# L-80 107 - 3753 107.0 - 3484.3 4930 Measured depth: 9674 - 9730, 9744 - 9799, 9826 - 9827, 9827 - 9831, 9831 - 9832, 9840 - 9842, 9842 - 9868, 9888 - 9896 True vertical depth: 8741.79 - 8791.97,8804.53 - 8853.91,8878.19 - 8879.09,8879.09 - 8882.68,8882.68 - 8883.58,8890.78 - 8892.58 8892.58 - 8916,8934.02 - 8941.24 Tubing ( size, grade, and measured depth): 5-1/2" 17# 13Cr80 4-1/2" 12.6# 13Cr80 Packers & SSSV (type & measured depth): 3-1/2" Otis WD Packer 4-1/2" Baker SB3 Packer 5-1/2" Otis QOS SSV Collapse 470 7020 10530 7020 4760 1950 2270 9331 9347 t:,Ct:~ 'v1AR 1 0 200./:' @ 25 @ 9331 @ @ @ 9810 9311 2240 A h.] ~;JG'i 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 ReDresentative Dailv Averaae Production or Iniection Data Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure Tubing Pressure 210 0.9 11839 1900 237 190 0.8 11371 2050 239 14. Attachments: 15. Well Class after proposed work: Exploratory D DevelopmentŒ] Service D 16. Well Status after proposed work: Operational Shutdown D Oil[!] GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Copies of Logs and Surveys run - Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garr Catron Title Production Technical Assistant Signature IØJMS BfA.. Phone 564-4657 Form 10-404 Revised 12, /200" 3 =- ". Ai'] . 2 ~oo nOR \ SCANNED Nt rt 1. ~, t.. 'é} Date 3/8/04 03-35 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/11/03 DRIFT WI 2.70 CENTRILlZER, TUBING END LOCATER,SAMPLE BAILER. LOCATE TTL @ 9400 SLM...ELMD @ 9432 ...+ 32' CORRECTION TAG TO @ 9920' SLM +32' = 9952 CORR DEPTH. 11/15/03 MIRU CTU #5. MU/RIH WI 2.5" JSN. TAG TO, CORRECT TO 9952'. JET 60/40 ACROSS LINER 9910' TO 9942'. POOH, MU IBP BHA. FP FLOWLINE W/CRUDE, PUMP WELL BORE VOLUME CRUDE DOWN TUBING. MU/RIH WI 2.5" IBP, TIE IN TO XN NIPPLE @ 9821' WI TEL. SET IBP @ 9930' (CENTERLINE ELEMENT). PUMP 10 BBL WATER/BALU10 BBL WATERI METH-WTR. PUT BALL ON SEAT. ALLOW THERMAL STABILIZATION. 11/16/03 END THERMAL STABILIZATION ON IBP. PRESSURE UP IBP IN STAGES TO RELEASE @ 1600 PSI. TAG @ 9930'. POOH. MU 2.23" BON. PERFORM WEEKLY BOP TEST. RIH WI 2.23" BON. TAG IBP @ 9923'. PUMPED 2 BBLS OF 4 PPG 20/40 RIVER SAND SLURRY ABOVE IBP. TAG SAND TOP @ 9920'. POOH. MU/RIH WI 2.6" PIG SHEAR NOZZLE. CIRC 1 % KCL DOWN CT. TAG SAND TOP, CORRECT DEPTH. 11/17/03 PLACE 1.5 BBLS CLASS G 15.8 ON SAND TOP @ 9920' WI PIG SHEAR NOZZLE. CALCULATED CEMENT TOP @ 9880'. NO SHEAR ON PIG SHEAR NOZZLE. POOH. FREEZE PROTECT COIL AND WELLBORE TO 2000'. RDMO. 11/19/03 TAG TT @ 9398' SLM. (34' CORR.) TOP OF CEMENT @ 9880' SLM. + 34' = 9914' MD. SECURE WELL. NOTIFY DSO TO POP WELL AND TEST. RDMO. FLUIDS PUMPED BBLS 289 60/40 Methonal/Water 260 Crude 229 1 % KCL 1.5 15.8# Class G Cement 50 Sea Water 350 Lbs 20/40 River Sand 6 HEC Gel 65 Fresh Water 1250.5 TOTAL Page 1 lREE= Ftv'C WELLHEAD = Ftv'C AClUA TOR = AXELSON KB. ELEV = 60' BF. ELEV = ? KOP= 800' Max Angle = 28 @ 7600' Datum rvÐ = 9806' Datum lVD = 8800' SS 03-35 I SAFETY NOTES: CHROME UNER & TUBING 13-318" CSG, 68#, L-80/K-55, ID = 12.415" Minimu m ID = 2.750" @ 9821' 3-112" OTIS XN NIP PLE 15-1/2" 18G, 17#, 13-CR, .0232 bpf, ID = 4.892" I TOPOF 4-1/2" TBG I ¡TOP OF 7" LNR I 14-1/2"TBG, 12.6#, 13-CR, .0152 bpf, ID =3.958" I 19-5/8" CSG, 47#, L-80, ID = 8.681" I PERFORA 1l0N SUMfW\RY REF LOG: DIESEUSW ON 07/05/91 ANGLEA TTOP PERF: 26 @ 9674' I\bte: Refer to A"oduetún œ for historieal perf data SIZE SPF INTER\! A L Opn/Sqz DATE SEEPAGE2 FOR ÆRF BREA KDOWN 1 TOP OF 3-1/2" TBG 1 3-1/2" TBG, 9.2#, 13-CR, .00870 bpf, ID = 2.992" ~ 17" LNR, 29#, L-80/13-CR, .0371 bpf, ID = 6.184" I 6) ST MD 1 3212 2 4142 3 4901 4 5491 5 6039 6 6588 7 7216 8 7717 9 8309 10 8764 11 9048 12 9202 DATE REV BY COMMENTS DATE REV BY COMIvENTS 07/08/91 ORIGINAL COM PLETION 07/27/91 LAST WORKOVER 02/08/01 SIS-LG REVISON 04/06/01 RN'KAK CORRECTONS 03/19/03 B HC/lL H CORRECTONS 11/16/03 DBM/lL P CMT & SAND TOPS, SEllBP 5-1/Z' OT RQ SSSV NP, ID = 4.562" GA S LIFT MANffiELS TV D DEV TYPE VL V LA TQ- 3002 28 FM-iO RK 3832 27 FM-iO RK 4510 27 FM-iO RK 5035 28 FM-iO RK 5520 28 FM-iO RK 6006 27 FM-iO RK 6563 28 FM-iO RK 7005 28 FM-iO RK 7529 28 FM-iO RK 7931 28 FM-iO RK 8183 27 FM-iO RK 8320 27 FM-iO RKP FO RT DA. TE 5-1/2" LOCSEAL ASSY -19-5/8" X 5-1/2" BKR SB-3A PKR -15-1/2" X 4-1/2" XO I -14-1/2" OT XN NO-GO NIP, ID =3.725" I -14-1/2" TLBING TAIL W/ BKR WLEG 1-1 B.MD TT LOGGED 02/13/031 -17" X 3-1/2" OT BWDPKR -13-1/2" OT XN NIP, ID=2.75" I -13-1/2" TLBING TAIL W/WLEG I 1-1 B.rvÐ TT LOGGED 08/03191 I -1 TOP OF CErvENT I -1TOPOF SAND I -12-1/2" IBP - SET 11/16/03 I PRUDHOE BAY UNIT WELL: 03-35 PERMT I\b: 1910800 APII\b: 50-029-22184-00 SEC 14, T1 ON, R15E 1447.11 FEL 925.86 FNL BP Exploration (Alaska) PffiFORA TION SUMMARY REF LOG: DIESB../SW ON 07/05/91 A NGLE AT TOP ÆRF: 26 @ 9674' Note: Refer to Production DB for histork:al perf data SIZE SPF INTffiV AL Opn/Sqz DATE 3-3/8" 4 9674 - 9730 0 08/06/91 3-3/8" 4 9744 - 9799 0 08/06/91 2-1/2" 4 9826 - .9827 0 01/21/94 2-1/2" 4 9827 - 9831 0 01/21/94 2 -1 /2" 4 9831 - 9832 0 01/21/94 2-1/2" 4 9840 - 9842 0 01/21/94 2-1/2" 4 9842 - 9868 0 01/21/94 2-5/8" 1 9888 - 9896 0 07/13/92 2-1/8" 1 /2 9944 - 9950 0 02/21/92 03-35 8 DATE REV BY COMMENTS DATE REV BY COMMENTS 07/08/91 ORIGINAL COM PLETION 07/27/91 LAST WORKOVER 02/08/01 SIS-LG REVISON 04/06/01 RI\VKAK CORRECTONS 03/19/03 B He/TL H CORRECTONS 11/16/03 DBM/TLP CMf & SAND TOPS, SETlBP PRLDHOE BAY LNIT WELL: 03- 35 PffiMT I\b: 1910800 APII\b: 50-029-22184-00 SEC 14, T1 ON, R15E, 1447.11 FEL 925.86 FNL BP Exploration (Alaska) MEMORANDUM State of Alaska ;~~ Alaska Oil and Gas Conservation Commission TO: Julie Heusser, DATE: Commissioner THRU: -Tom Maunder, P. I. Supervisor January 15, 2001 FROM:' SUBJECT: John CrisP, Petroleum Inspector Safety Valve Tests Prudhoe Bay Field Drill Site 03 January 15, 2001' I traveled to BP's Prudhoe Bay Field to witness Safety Valve System tests on DS 03. Mark Womble waS BP representative in charge of testing DS 03. Testing had been canceled on DS 03 1-14-01 due to blowing snow & chill factor of-50 degrees. Testing was conducted in a safe & efficient manner. Two failures were witnessed. The AOGCC test report is attached for reference. 21 wellhouses were inspected during~ SVS tests. Wellhouses are in fair condition considering these were inspected after our recent blow. No heat or lights are installed in wellhouses for producing wells. SUMMARY: I Witnessed SVS tests in PBU on DS 03. 21 wells, 42 components tested. 2 failures witnessed. 4.8% failure rate. 21 wellhouses inspected. AttaChments· SVS PBU DS 03 1-15,00jc cc; NON-CONFIDENTIAL SVS PBU DS 03 1-15-01jc.doc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Mark Womble AOGCC Rep: John Crisp Submitted By: John Crisp Date: Field/Unit/Pad: Prudhoe Bay Field DS 03 Separator psi: LPS 185 HPS 1/15/01 69O Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN& Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE 03-01 1750750 185 150 100: P P OIL 03-02 1760240 185 150 120 P P OIL 03-03 1760390 185 150 110 P P OIL 03-04 1760510 , 03-05 1760570 03-06 1760600 03-07 1760530 :03-08 1760730 ' 185 150 130 P P OIL 03-09 1790220 185 150 100 P P OIL 03-10 1790210 ~03-11 1790470 03-12 1790580 03-13 1790710 03-14 1790820 185 150i 100 ::P P OIL 03-15A 1930150 185 150 100 P P OIL 03-16A '1970330 03-17 1791020 03.18A 1930420 03-19 1830920 185 150 90 P P OIL 03-20A 1930470 185 150 100 P P OIL 03-21 1831120 185 150 100 P P OIL 03-22 1831230 690 600 420 P P OIL 03-23 1831270 185 150 0 1 P OIL 03-24A 1980060 690 600 530 P P OIL 03-25A 1930230 03-26 1831510 185 150 110 P P OIL, 03-27 1840620 185 150 100 P P OIL 03-28 1840720' 03-29 1840790 185 150 110 P P OIL . 03-30 1840830 185 150 90 P P OIL 03-31 1840920 185 150 140 P P OIL 03-32A 1940540 185 150 -110 P P OIL 03-33A 1970390 03-34B 2000110 185 150 0 1 P OIL 1/18/01 Page 1 of 2 SVS PBU DS 03 1-15-01c.xls Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE 03-35 1910800 185 150 90 P P OIL 03-36 1930190 Wells: 21 Components: 42 Failures: 2 Failure Rate: 4.8% Remarks: 1/18/01 Page 2 of 2 SVS PBU DS 03 1-15-01c.xls THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 2 2000 E P M L A T TE R IA HIS M E W UNDER A R K E R GeoQuest $00 W. International Alrporl Road Anchorage, AK 99518-1199 ATTN: Sherfle NO. 8979 Company: Alaska OII & Gas Cons Comm , Attn: Larry Grant I 3001 Porcupine Drive Anchorage, AK 99501 10/11/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 1-9A(~ ~,-j~_ '",~ _~_ DUAL BURST TDT-P (9-25-94~] 1 1 D.S. 3.11 "7 ~ - ~ '7 INJEC PROFILE (9-21-94) 1 .. 1 ........ D.S. 3-18A , ~ ~ .- '-.J "Z.._ IN.JEC PROFILE (9-27-9,4) 1 1 D.S. 3.35 ...c~ ! - ~"O PROD PROFILE (9-22-94). 1 1 D.S. 4.38 ~/-- / I ~ LEAK DETECTION (~24-94) , . 1 1 D.S. 9-7 '7~',~- 5'--.~'. PERF RECORD (9-26-94) 1 1 D.S: 9-07 ?~ --- 5-- ~d' PROD LOG (9-23-94) 1 1 D.S. 9-21 '~'%---.I/,,6 STATIC PRESSURE SURVEY (9-23-94) .... 1 1 D.S. 9-26 ~'~" -~ '7 LEAK DETECTION (9.26.94) . 1 1 D.S..9-45 ~(2 - !( ~ PROD PROFILE (9-24-94) ... 1 1 ........... D.S. 17-15 _~'2..- IoO STATIC PRESSURE SURVEY (9'-23-94) 1 ,, 1 D.S. 7-23 ~ ~ "- G ~ USIT (9-30-94~] .. 1 1 ,, ,, Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you; OCT Oil & Cas Cons '4nCflora~' STATE OF ALASKA ALASK,"~-'-'JL AND GAS CONSERVATION C '1MISSION REPOR'I OF SUNDRY WELL OPI RATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other · 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1846' FSL, 700' FWL, sec. 11, T10N, R15E, UM At top of productive interval 835' FNL, 1675' FEL, sec. 14, T10N, R15E, UM At effective depth At total depth 1008' FNL, 1487' FEL, Sec. 14, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service RECEIVED AUG 1 5 1994 Alaska 0il & Gas Cons. Commission Anr, hnra.?, 6. Datum of elevation(DF or KB) 60' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-35 9. Permit number/approval number 91-80 10. APl number 50 - 029-22184 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10211' feet 9226' feet Effective depth: measured 9975' feet true vertical 9011' feet Plugs(measured) PBTD Tag @ 9775' MD (1/21/94) ?~r'~'~ !~',..!' Junk(measured) feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 11 yds AS 112' 112' Surface 3693' 13-3/8" 2762 cf AS III; 466 cf G; 109 cf AS I 3753' 3484' Production 9591' 9-5/8" 1140 cf MTC & 464 cf G 9651' 8720' Liner 868' 7" 307 cf G 10207' 9222' Perforation depth: measured 9674-9730'; 9744-9799'; 9826-9832'; 9840-9868'; 9888-9896'; 9944-9950' true vertical 8741-8791 '; 8804-8853'; 8878-8884'; 8890-8916'; 8934-8941'; 8984-8990' Tubing (size, grade, and measured depth) 5-1/2", 17#, CR-13 tbg @ 9331' MD; 4-1/2", 12.6#, CR-13 tbg @ 9347' MD; 3-1/2", 9.2#, CR-13 tbg @ 9815-9824' MD Packers and SSSV (type and measured depth) 5-1/2" Baker SB-3A Packer @ 9311' MD; 7" Otis BWD pkr @ 9810' MD; Otis RQ SSSV @ 2240' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoin9 is true and correct to the best of my knowledge. Signed [) b ~/'4'v"vv'¢! Title Sr. OAEngineer Form 10-404 l~v 06/15/~8 - Bepresentative Daily Average Production orlnjection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 968 ~ 1759 6543 o- 1256 2516 8964 -- Tubing Pressure 258 256 16. Status of well classification as: Oil. x Gas Suspended Service SUBMIT IN DUPLICATE 1178/12 cc: KZ, JWP ~, 3-35 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 1/21/94- MIRU & PT equipment. RIH & tagged bottom fill at 9975' MD. to reperforate & add perforations as follows' Made two perforating gun runs Added perforations' 9826- 9827' MD (74) 9831 - 9832' MD (Z4) 9840 - 9842' MD (Z4) Ref. Log: BHCS 7/5/91. Reperforated: 9827- 9831' MD (Z4) 9842 - 9868' MD (Z4) Ref. Log' BHCS 7/5/91. Used 2-1/2" carriers, shot 4 spf, at 180 degree phasing. Shot at underbalanced pressures. POOH w/perf guns; noted all but two shots fired. Rigged down. Returned the well to production w/gas lift & obtained a valid welltest. RECEIVED AUG 3 $ 1994 Alaska Oil & Gas Cons. Cornmissior, Anchorage ARCO Alaska, Inc. P.O. Box 100360, / Jorage, AK Date: Feb 25, 1994 Transmittal #: 94024 Subject- ARCO Static Pressure Surveys From/Location: John E. DeGrey/ATO-1529 Telephone: (907) 263-4310 To/Location- Distribution Welli Number 3'8i i 3-34A ~ 3-36 ~ 4-32 +~N* ~ 5-12 ~ 7-7A 7-8 j 9-2-93 9-49 ~ 9-14-93 11-17 ~ ~1-26-93 (M-D-Y) 6-5-93 i Static Press Sun/. 7-21-93 I Static Press Sun/. 11-22-93 Static Press Sun/. 1-3-94 j Static Press Sun/. 11-22-93i Static Press Sun/. 12-7-93 ~ Static Press Surv. 7-24-93 I Static Press Sun/. 11-17-93 t Static Press Sun/. 1-3-94 ! Static Press Sun/. ! 9-8-93 I Static Press Sun/. 11-21-93 t Static Press Sun/. 7-21-93 j Static Press Sun/. -28-93 Static Press Sun/. 1.1 7-21-93 Static Static Static Static Press Sun/. Press Sun/. Run, Sc~Je ! 5II Contractor i Sch Sch " Sch " Sch " Sch " Sch " Sch " Sch " Sch Sch Sch Sch " Sch " Sch " Sch Press Sun/. ! " Press Sun/. " Static Press Sun/. ~ " Static Press Sun/.i " Static Press Sun/. I " Sch Sch ~_'7..oO Sch Sch Sch Sch 12-16A ! 11-8-93 13-14 I 7-2-93 13-14 I 7-2-93 14-01 11-25-93 14-6 11-25-93 14-18 ~ 11-26-93 14-38 12-4-93 14-39 12-4-93 15-6 I 5-28-92 Static Press Sun/. Static Press Sun/. Static Press Sun/. 15-15 t 15-16 15-18 ! 15-23 ! 16-17 ~ 12-29-93 16-22 ~ 7-18-93 17-1 ¢ 11-23-93 17-13 j 8-27-93 18-29A ~ 5-19-93 Static Press Sun/. I " Static Press Sun/. i " Static Press Sun/. " Static Press Sun/. I " j 7-5-93 8-26-93 10-26-93 9-23-93 7-21-93 Static Press Sun/. ~ " Static Press Sun/. f " Static Press Sun/. I " Static Press Sun/. " Static Press Sun/. " Static Press Sun/. Static Press Sun/. Static Press Sun/. Static Press Sun/. Static Press Sun/. Static Press Sun/. Sch Sch Sch q Sch j Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch ARCO Alaska, Inc. Is a Subsidiary of AllantlcRId~laldCon~ir~/ ARCO Alaska, Inc. Date' Subject- From/Location: Telephone: To/Location- P.O. Box 100360, ;horage, AK Jan 28, 1994 Transmittal #: ARCO Cased Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution 94016 99510.~ ~, Well Number 70-/6 i 1-3 iT'F- 5'7- ! 1-11 7%-[Tq! 1-22 ci0- 2.~ i 2-29A 3-2 3-2 3-16 3-22 3-22 { ~3-22 3-35 3-36 5-35 5-35 9-13 1 1-24 Log Date i Tool Type (M-D-Y) i ~Oc~Lw~ ~ 1-14-94 ! Tubing Puncher ! 1-14-94 t Perf Record Run, Scale ; 5II 1~ 5II 1-13-94 1-18-94 1-19-94 1-15-94 1-10-94 Bridge Plug ~.~ ¢¢41, 5" CNL i' 1, 5" Bridge Plug ~{. 1, 5" Leak Determin 1¢-4~1¢~, 5"/T~/i Perf Record i 1, 5" Contractor Sch Sch Sch Sch Sch Sch Sch 1-19-94 &\ Bridge Plug ~¢z~, 1, 5" Sch 1-16-94 Leak Determin !¢,¢61g~.,d~'I ~-~ $ch ' · ii ii 1-10-94 Leak Detect/~7.~ [ :17f~1., ¢~5 ¢~J,k_' ~.-~,~ c h 1-21-94 Perf Record ! 1, 5" ' t ' Sch 1-20-94 Prod Profile,~,.~.,~ Ini Profile IBPSetting ¢~..i' 1', '5" Prod Log i 1, 2"&5" Leak Detect Compl Recor~l 1 ) 5" Leak D et ect/~ofr~ ~1 "&6',~c f Tubing Cutter '¢.-~.... 1;, 5;' "' Sch Sch .Sch Sch .,r' Sch Sch Sch Sch 1-15-94 1-18-94 . 1-18-94 01-14-94 1-22-94 1-19-94 1-17-94 CompI Record i 1, 5" Tubing Cutter ~..~. 1, 5" Tubing Puncher i4v.~c~ 1, 5" Patch Setting ¢, ,~Ik 1, 5" Dual Burst TDTP i 1, 5" Sch Sch ct~-~%! 12-16A .~94 l~q-i~r0{/15-7 ! 1-22-94 !'% 15-7 ! 1-17-94 t~-'t'~! 17-13 ! 1-8-94 ]~l-~Oj 18-1 i 1-20-94 Number of Records:24 /~d~'ohn E. DeGrey PBOE Document Control Sch Distribution: Central Files Phillips Chevron ANO-8 Geology BPX Exxon state 'of Alaska~ Mobil ..%, ~.~. _ - RECEIVED FEB 0 1 Alaska Oil & 8as Oons. Oommission Anchorage Please acknowledge receipt by signing and returning a copy of transmittal. By: /~ ~,.,,.//~,.;... ~ Date: ARCO Alaska, Inc. Is a Subsld[sry of Atl~ntlcRIcht'leidCompany , STATE OF ALASKA ALASKA ...... '_ AND GAS CONSERVATION Cf' -- ¢IISSION REPORT SUNDRY WELL OP qATIO 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging Perforate 2. Name of Operator ARCO Alaska, Inc. Pull tubing Alter casing Repair well Other 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1846' FSL, 700' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 835' FNL, 1675' FEL, Sec. 14, T10N, R15E, UM At effective depth At total depth 1008' FNL, 1487' FEL, Sec. 14, T10N, R15E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 3693' Production 9591' Liner 10157' Perforation depth: 5. Type of Well Development X Exploratory Stratigraphic . , Service 6. Datum of elevation(DF or KB) 60' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-35 9. Permit number/approval number 91-80 10. APl number 50 - 029-22184 11. Field/Pool Prudhoe Bay Oil Pool feet 10211' feet Plugs(measured) Sand top @ 9729' M D 9226' feet 10160' feet 9180' feet Junk(measured) Size Cemented IVleasured depth 20" 2000# Poleset 112' 13-3/8" 1425 sx CS III & 400 sx CI 'G' 3753' 9-5/8" 350 sx CI 'G' 9651' 7" 150 sx CI 'G' 10207' measured 9674-9730';9744-9799';9827-9831 ';9842-9868';9888-9896';9944-9950' true vertical 8741-8791 ';8804-8853';8879-8883';8892-8916;8934-8941 ';8984-8990' True vertical depth 112' 3484' 872O' 9222' Intervals treated(measured) Treatment description including volumes used and final pressure S E P - 1 1992 Alaska Oil & Gas Cons. 6ommissior~ 'A n~,hnrono 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 4000 "' 4900 5200 -- 4300 / 6900 5800 Tubing Pressure 340 37O 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X~ Gas Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~ ~ Title FS-2 Regional Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE Tubing (size, grade, and measured depth) 5-1/2",17#,CR-13 tbg @ 9331' MD;4-1/2",12.6#,CR-13 tbg @ 9347'MD; 3-1/2",9.2#,CR-13 tbg @ 9824'MD Packers and SSSV (type and measured depth) 5-1/2" Baker SB-3A 194-60 pkr@ 9311' MD;7" Otis BWD pkr @ 9810' MD; Otis SSSV @ 2240'MD 13. Stimulation or cement squeeze summary IX ~II.y REPORT OF WELL OPER. iONS DS 3-35 Perforating Operations: ARCO Alaska, Inc. perforated DS 3-35 at a selected interval in the Sadlerochit Sand of the Prudhoe Bay Unit on 7/13/92. The interval perforated was the following: 9888'-9896' MD (Reference Log: AWS BHCS dated 7/5/91). Production fluid was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 7/13/92. RU perforating unit, pressure tested BOP's to 3500 psi and lubricator to 2500 psi, okay. S1 well, RIH and perforated 9888'-9896' MD at 1 SPF, POOH, and confirmed all shots fired. (ref: AWS BHCS of 7/5/91).Rigged down and secured well. s E P - I ^laska Oil & Gas (Dons, Oomrnission Anchorage RDC: 8/20/92 ARCO ,~l~sk_~, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-31-92 REFERENCE: ARCO CASED HOLE FINAI~ 1-4 S° '>~ 7-12-92 CCL/Perf Run 1, 5" Atlas 1-13 ?~-.;~ 7-18-92 CCL/Perf Run 1, ~' Atlas 2-31 7-6-92 Prod/Press/Spin/Temp/Trap Run 1, ~' Sch 3-10 ~x~_~/ 7-6-92 CCL/Perf Run 1, 5" Atlas 3-35 7-13-92 C~L/Perf Run 1, ~' Atlas 9-9 ?~"?~ 7-12-92 CCL/Perf Run 1, ~' Atlas 9-11 ?~/ 7-13-92 CCL/Perf Run 1, ~' Atlas 11-7 ~/-///~ 7-11-92 CCL/Tttbing Cutter l~_,n 1, ~' Atlas ~11-16ST 5-30-92 MAI Acoustic Filtered Waveforms 1~_,- 2, ~' Atlas 111-16ST 5-30-92 BHC MAI Comp Slowness Curves Run 2, 1~' & g' Atlas 12-6A~.~-~/7-11-92 PFC/GR Run 1, 5" Atlas 15-9 7-13-92 Collar/Peri Run 1, 5" Atlas 15-28 ~ ~/y~ 7-12-92 PFC/GR. Run 1, 5" Atlas 17-3 7-12-92 CCL/Perf Run 1, 5" Atlas NGI-11 7-19-92 CCL/Tubing Cutter Run 1, ~' Atlas Please sign and return the attached copy as receipt of data. RECEIVED BY .~~~_~___ Have A Nice Day! Sonya Wallace ATO-1529 APPROVED_ Trans# 92173 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ~IASKA TEXACO R£C£1V D AUG 10 '~992 Alaska Oil 8, 6a~ Gon~. Gommi$~ion Anchorage /7 ARCO .4Jas~, Inc. P.O.Box 100360 AnChorage, Alaska 99510 DATE: 6-19-92 REFERENCE: 7~ ~- ~ $~--/~ ~3~T ARCO CASED HOLE FINALS 5-12-92 Jewelry Run 1, 5" Camco 5-21-92 GR-Collar Run 1, 5" Camco 5-15-92 Prod Profile Run 1, 5" Camco 5-12-92 Prod Profile Run 1, 5" C~mco 5-12-92 Jewelry Run 1, 5" Camco 5-17-92 Prod Profile Run 1, :~'&5" Camco 5-11-92 Prod Profile Run 1, 5" Camco 5-16-92 PITS Run 1, 5" Camco 5-15-92 PITS/Flowmeter Run 1, 5" Camco 5-24-92 Prod Profile Run 1, 5" Camco 5-16-92 Prod Profile Run 1. I~' Camco 5,15-92 Prod Profile Run 1, 5" Camco 5-14-92 Prod Profile Run 1, 5" Camco 5-14-92 Prod Profile Run 1, 5" Camco 5-16-92 Gas Lift Run 1, :~'&5" Camco 5-25-92 InJ Profile Run 1, 5" Camco 5-14-92 InJ Profile Run 1, 5" Camco 5-14-92 InJ Profile Run 1, 5" Camco 5-19-92 CCL/GR/Junk Basket Run 3, 5" Camco · Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day! Sonya Wallace APPROVED_ ATO- 1529 Trans# 92121/ # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO RECEIVED * The correct APl# for 9-30ST is 50-029-21411-00. AUG 1 0 1992 Alaska Oil & Gas Cons. Commission Anchorage /0 ARCO Alaska~ Inc. P.O.Box 100360 Anchorage, ,~IAskA 99510 DATE: 4-27-92 REFERENCE: ARCO CASED HOLE FINALS 3-8 2-25-92 Collar 3-35 2-21-92 CCL/Perf 4-3 2-9-92 Perf Record 4-3 3-2-92 Perf Record 4-7ST 3-2-92 Perf Record 5-14 2-11-92 Perf Record 6-21 2-22-92 CCL/Perf 9-43 2-12-92 Perf 11-3A 2-23-92 CCL/Perf 3~ ~i zz~ 14-32 2-28-92 Perf Record 2-28-92 Perf Record Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Rim 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" ~F~-~/~17-11 Run 1, 5" Please sign and return the attached copy as receipt of data.~ ~ C E I~ ~ 0 RECEIVED BY Have A Nice Day! Sonya Wallace ATO-1529 ~s~ 920 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALAS~ TEXACO * The correct APl# for 11-3A is 50-029-20666-01. · ,- STATE OF ALASKA ALASKA UlL AND GAS CONSERVATION COiv,,VllSSlON ~ WELL COMPLETION OR RECOMP LETION REPORT AND LOG .' 1. Stalus of Well Classification of Service Well OIL [] GAS [] SI...ECENDED [] ABAN[:X:~ED [] SERVICE [] 2. Name df Operator ~' 7. Permit Number ARCO Alaska, Inc. 91-80 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22184 4. Location of well at surf ace ~' ~..i'~ i,~i ~ 'i~ ~'~L~ ;'..,.'~:J~ ;i~'[ 9. Unit or Lease Name 1846'FSL, 700'Fwl, SEC. 11, TllN, R15E ~ ............. ~,~:~* ~"~ ....... At Top Producing Interval 2109'FNL, 3670'FWL, SEC. 14, T11N, R15E :¢. ii '"" Pool At Total Depth '-' ;~' "!'' :~L~ ' Prudhoe Bay Field/Prudhoe Bay Pool 925'FNL, 3836'FWL, SEC. 14, T11N, R15E 5. Elevation in feet (indicate KB, DF. etc.) 16. Lease Designation and Serial No. KBE = 60' I ADL 28332 12. Date Spudded 13. Date T.D. Reached 14. Date Comp.. Susp. or Aband. 115. Water Depth, il offshore 116. No. of Completions I 6/21/91 7/4/91 8/6/91' N/A feet MSL ! ONE 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set J21. Thickness of Permafrost 10211'MD/9226'TVD 10160'MD/9180' YES [] tO:) []! 2240'feet MD.. I 1900' 22. Type Electric or Other Logs Run CNT/TEMP/GR/BHC/DIL, CET/CBT/GR, GCT GYRO 23. CASING. LINER AND CEMENTING ~ SE'FI'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTI'4G RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 11 O' 30" 11 Yards Arcticset 68# L-80 Surface 3753' 16" 2762 cf ASIIl & 466cf CIG Top J'o'b 13-3/8" w/ lO9 cf ASi 9-5/8" 47# L-80 Sorf~ce 9652' 12-1/4" 1140 cu'ft MTC & 464 cuft CI ass G 7" 29# L-80 9339' 10207' 8-1/2" 307 cu ft Class G 24. Pedoralions open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET (MD) . 9674'-9730' MD/8741 '-8791' TVD 5-1/2" w~ 9348'& 9824' 93~1' & 9810' 9744'-9799' MD / 8804'-8853' TVD '3-1/2" x 2- 7/8" tai 4 SPF 26. ACID, FRACTURE. CEMENT SQUEEZ~ ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ., 27. PRODL,~TION TEST Date First Production IMethod of Operation (Flowing, gas lift. elc.) 8/6/91 I FIowin~l Date of Test - Hours Tested PROEX.~TION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED OIL-BBL C~S-MGF WATER-BBL DIl_ GRAVITY-APl Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lith°logy, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. None Alasi(a .Oil & Gas Cons, *NOTE: Drilled 7/8/91. Tubing Ran 7/26/91. Perforated 8/6/91. 'Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ' " 30. GEOLOGIC MARKERS ~-,,.,'RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. 7~p Sadlerochit 9672' 8739' None ne 4 ~' 9672' 8739' Zone 3 ' 9882' 8928' Zone 2 ' ~ 9921' 8963' H. 0. T. 10032' 9063' Zone 1 10135' 9157' 31. LIST OF ATTACHMENTS .., 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~'J INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ACTIVITY SUMMARY BP/AAI SHARED SERVICE ") '~RUDHOE BAY "' NORTH SLOPE DS 3-35 AK POOL 6 SURF CIRC: 2.0 BOPE: 2.0 OTHR: 20.0 06/21/91 ( 1) PREP TO SPUD. MW: 8.7 VIS:300 TD: 110' ( 110) COMPLETE RIG SET UP. RIG ACCEPTED @ 00:00 HRS, 6/21/91. SUPV:LAP START MIX MUD. M/U BHA #1. TEST DIVERTER. HOLE ANGLE:26 12 DAILY:S355,644 CUM:$355,644 ETD:S355,644 EFC:$3,010,000 SURF DRIL: 20.0 TRIP: 1.5 OTHR: 2.0 PROB: 0.5 PROB CODE: TH 06/22/91 ( 2) DRLG. MW: 8.9 VIS:287 TD: 1100' ( 990) SPUD WELL @ 06:00 HRS, 6/21/91. DRLG F/ 110'-500'. POOH. SUPV:LAP CHANGE BHA. RIH. REAM F/ 40'-500' DRLG F/ 500'-1100' HOLE ANGLE:26 12 DAILY:S64,522 CUM:$420,166 ETD:S420,166 EFC:$3,010,000 SURF DRIL: 19.8 TRIP: 3.7 CIRC: 0.5 06/23/91 ( 3) RIH. MW: 9.0 VIS:310 TD: 1935' ( 835) DRLG F/ 1100'-1935' CBU. POOH. SUPV:LAP HOLE ANGLE:26 12 DAILY:S62,672 CUM:$482,838 ETD:S482,838 EFC:$3,010,000 SURF DRIL: 23.2 TRIP: 0.8 ' " 06/24/91 ( 4) DRLG. "~'-'"' 13-3/8"~ 3753' '.MW: 9.2 VIS:270 TD: 3656' ( 1721) RIH. DRLG F/ 1935'-3656' SUPV:LAP · · HOLE ANGLE:26 12 DAILY:S62,440 CUM:$545,278 ETD:S545,278 EFC:$3,010,000 SURF DRIL: 1.0 TRIP: 5.2 CIRC: 6.3 CASG: 11.5 06/25/91 ( 5) PERP FOR TOP JOB. 13-3/8"@ 3753' MW: 9.3 VIS: 42 TD: 3767' ( 111) DRLG F/ 3656;-3767' CBU. SHORT TRIP TO HWDP. CBU. POOH. SUPV:LAP RIH W/ !3-3/8" CSG. FLOAT SHOE @ 3753', FLOAT COLLAR @ HOLE ANGLE:26 12 3673' CIRC. R/U DOWELL. PUMP 100 BBLS SPACER, 492 BBLS (1425 SX) ASIII @ 12.1 PPG, 83 BBLS (400 SX) 'G' CMT W/ 2% S1, .2% D46 @ 15.8 PPG. DISP W/ 542 BBLS FRESH WATER. BUMP PLUG W/ 2000 PSI. REMOVE CMTHD. RELEASE LAND JT. REMOVE DIVERTER. DAILY:S232,329 CUM:$777,607 ETD:S777,607 EFC:$3,010,000 SURF DRIL: 2.5 TRIP: 1.3 RIGS: 0.2 CIRC: 0.7 CASG: 4.5 BOPE: 11.8 OTHR: 3.0 06/26/91 ( 6) TD: 3777' ( 10) SUPV:LAP HOLE ANGLE:26 12 CIRC. 13-3/8"@ 3753' MW: 8.6 VIS'100 L/D LAND JT. N/D DIVERTER. TOP JOB W/ 117 SX ASI CMT @ 15.7 PPG. INSTALL FMC HGR. TEST SEALS. N/U BOPE. TEST BOPE. P/U BHA. RIH TO 3672' TEST CSG. DRLG FC, CMT TO 43' TO 3777' DAILY:$1~4,727 CUM:$922,334 ETD:S922,334 EFC:$3,010,000 P1 DRIL: 21.8 TRIP: 1.0 CIRC: 0.5 EVAL: 0.7 06/27/91 ( 7) DRLG. 13-3/8"@ 3753' MW: 9.2 VIS: 45 TD: 5360-~ (1583) PERFO?~4 LOT (12.7 PPG EMW) . DRLG F. 3777'-4796' CBU. SUPV:BZJ SHORT TRIP TO SHOE. DRLG F/ 4796'-5360' HOLE ANGLE:~6 12 ~ DAILY'S65,028 CUM'$987,362 ETD:S987,362 EFC:$3,010,000 ACTIVITY SUMMARY BP/AAI SHARED SERVICE ~ ' · ' pRUDHOE BAY NORTH SLOPE DS 3-35 AK POOL 6 P1 DRIL: 18.0 TRIP: 4.8 CIRC: 1.0 PROB: 0.2 PROB CODE: TH 06/28/91 ( 8) DRLG. 13-3/8"@ 3753' MW: 9.4 VIS: 44 TD: 6460'(1100) CRLG F/ 5360'-5525'. CBU. POOH. RIHo REAM 35' TO BTM. SUPV:BZJ DRLG F/ 5525'- 6460' HOLE ANGLE:26 12 DAILY:S74,615 CUM:$1,061,977 ETD:S1,061,977 EFC:$3,010,000 Pi DRIL: 21.5 TRIP: 1.5 CIRC: 1.0 06/29/91 ( 9) DRLG. 13-3/8"@ 3753' MW: 9.5 VIS: 41 TD: 7427' ( 967) DRLG G/ 6460'-7302' CBU. SHORT TRIP 20 STDS. DRLG F/ SUPV:BZJ 7302'-7427' HOLE ANGLE:26 12 DAILY:S64,989 CUM:$1,t26,966 ETD:S1,126,966 EFC:$3,010,000 P1 DRIL: 15.0 TRIP: 5.5 RIGS: 2.0 CIRC: 1.5 06/30/91 (10) DRLG. 13-3/8"@ 3753' MW: 9.8 VIS: 43 TD: 8180' ( 753) DRLG F/ 7427'-7674' CBU. POOH. RIH. DRLG F/ SUPV:BZJ 7674'-8180' HOLE ANGLE:26 12 DAILY:S59,568 CUM:$1,186,534 ETD:S1,186,534 EFC:$3,010,000 .. P1 DRIL: 21.8 TRIP: 0.8 RIGS' 0.7 CIRC: 0.7 07/01/91 (11) DRLG.~ ..... 13-3/8"@ 3753'" MW: 9.8 VIS: 44 TD: 9140' ( 960) DRLG F/ 8180'-8792' CIRC. SHORT TRIP TO 7603'. DLR F/ SUPV:BZJ 8792'-9140' HOLE ANGLE:26 12 DAILY:S69,669. CUM:$1,256,203 ETD:S1,256,203 EFC:$3,010,000 Pi DRIL: 15.7 TRIP: 4.8 RIGS: 1.0 CIRC: 2.0 PROB: 0.5 PROB CODE: TH 07/02/91 (12) POOH. 13-3/8"@ 3753' MW: 9.8 VIS: 43 TD: 9662' ( 522) DRLG F/ 9140'-9662' CIRC. SHORT TRIP 20 STDS. REAM F/ SUPV:BZJ 9607'-9662' CBU. POOH. HOLE ANGLE:26 12 DAILY:S63,829 CUM:$1,320,032 ETD:S1,320,032 EFC:$3,010,000 P1 07/03/91 (13) TD: 9662'( 0) SUPV:BZJ HOLE ANGLE:26 12 TRIP: 2.0 CIRC: 3.0 CASG: 13.5 BOPE: 5.5 CHNGE RAMS ON BOPE. 9-5/8"@ 9651' MW:10.0 VIS: 42 POOH. TEST BOPE. RIH W/ 9-5/8" CSG. R/U DOWELL. CIRC. PUMP 100 BBLS MUD, 100 BBLS PREFLUSH, 400 SX MTC @ M2.85 YIELD, 400 SX 'G' CMT W/ 1% B14, .2% D46 @ 15.8 PPG, 1.16 YIELD. DISP W/ 803 BBLS MUD. NO BUMP PLUG. L/D LAND JT. SET MANDREL PACKOFF. TEST S~E. N/D BOPE. INSTALL TBGHD. CHANGE RAMS. DAILY:S409,687 CUM:$1,729,719 ETD:S1,729,719 EFC:$3,010,000 PROD DRIL: 11.0 TRIP: 2.8 RIGS: 0.5 CIRC: 1.7 CASG: 0.8 BOPE: 4.0 OTHR: 3.2 07/04/91 (14) DRLG. 9-5/8"@ 9651' MW: 9.7 VIS: 39 TD: 9880' ( 218) ",TEST BOPE. L/D BHA. P/U BHA. RIH. TEST CSG. DRLG CMT, SUPV:BZJ PC TO 9641' CIRC. TEST CSG. DRLG CMT, FS TO 9652' DRLG HOLE ANGLEi26 12 F/ 9652'-98~0' . DAILY:S45,495 CUM:$1,775,214 ETD:S1,775,214 EFC:$3,010,000 ACTIVITY SUMMARY BP/AAI.SHARED SERVICE NORTH SLOPE · . · ,; PRuDHOE BAY DS 3-35 AK POOL 6 PROD DRIL: 14.0 TRIP: 4.0 SURV: 0.5 CIRC: 1.5 EVAL: 4.0 07/05/91 (15) RUN OH LOGS. 9-5/8"@ 9651' MW:10.0 VIS: 41 TD:10211' ( 331) DRLG F/ 9880'-10211' TD @ 20:00 HRS, 7/4/91. CIRC. SHORT SUPV:BZJ TRIP 6 STDS. CBU. POOH. R/U ATLAS. LOG RUN #1: HOLE ANGLE:26 12 CNT/TEMP/GR/BHC/DIL F/ 10211'-9651'. DAILY:S52,187 CUM:$1,827,401 ETD:S1,827,401 EFC:$3,010,000 DRIL: 14.0 TRIP: 4.0 07/05/91 (16) TD:10211' ( 0) SUPV:BZJ HOLE ANGLE:26 12 RCSG: 24.0 07/07/91 (17) TD:10211 PB:10211 SUPV:BZJ NDNU: 8.0 07/08/91 TD:10211 PB:10211 SUPV:BZJ (18) NDNU: 6.0 07/09/91 (19) TD:10211 PB:10211 SUPV:BZJ SURV: 0.5 CIRC: 1.5 EVAL: 4.0 RUN OH LOGS. 9-5/8"@ 9651' MW: 0.0 VIS: 0 RIH W/ 7" LNR. CIRC. CMT LNR. DAILY:S52,187 CUM:$1,879,588 ETD:S1,827,401 EFC:$3,062,187 DRLG CMT IN LNR. 9-5/8"@ 9651' MW:10.0 WBM PUMP 50 BBLS ARCO PREFLUSH, 265 SX 'G' CMT W/ 1.5 GPS D135, .1 GPS D135, .05 GPS D47, .25% D65, .11% D800 @ 15.8 PPG, 1.16 YIELD. DISP W/ 5 BBLS WATER, 23 BBLS 16 PPG MUD, 167 BBLS 10 PPG MUD. BUMP PLUG W/ 2500 PSI. SET LNR HGR & TOL @ 9339'. RELEASE F/ LNR. POOH. RIH. TAG CMT ~ 9062f.. CRLG CMT .F/ 9062'-9339' CBU. POOH RIH TO 10054'. TEST LNR TO'~00 PSi. DRLG LC, CMT TO 10{60"' DAILY:S145,!49 CUM:$2,024,737 ETD:S1,874,868 EFC:$3,159,869 RCSG: 16.0 N/U TREE. 9-5/8"@ 9651' MW:10.0 NaCl DRLG LC, CMT ~0 10159'. CIRC. TEST LNR. REV CIRC. DISP W/ 10 PPG NACL. POOH. L/D DP. N/D BOPE. N/U TREE. DAILY:S33,073 CUM:$2,057,810 ETD:S1,907,941 EFC'$3,159,869 RIG RELEASED. 9-5/8"@ 9651' MW:10.0 NaCl N/U TREE. PUMP 160 BBLS DIESEL. RIG RELEASED @ 12:00 HRS, 7/8/91. DAILY:S75,589 CUM:$2,133,399 ETD:S1,983,530 EFC:$3,159,869 NDNU: 7.5 RPKR: 1.'5 LPRF: 5.5 07/25/91 (20) RIH W/ PKR. 9-5/8"@ 9651' MW:10.0 NaCl TD:10211~ .' RIG ACCEPTED @ 15:30 HRS, 7/24/91. N/D TREE. N/U BOPE. PB:10160 TEST BOPE. TEST CSG. R/U ATLAS. RIH W/ CCL/GR/JB. TAG SUPV:SMS TOL @ 9339' POOH. RIH W/ GR/JB TO 9850'. POOH. RIH W/ OTIS 7" 'BWD' PKR & 3-1/2" TAIL ASS'Y W/ W/L. DAILY- $70, 070 CUM: $2,203,469 ETD: $2,053,600 EFC:$3, 159,869 ACTIVITY SUMMARY BP/B~I SHARED SERVICE NORTH SLOPE ~RUDHOE BAY DS 3-35 AK AUDI 4 RPKR: 2.5 07/26/91 ( 21) TD:10211 PB:10160 SUPV:SMS RCMP: 21.5 M/U TBG HGR. 9-5/8"@ 9651' MW:10.0 NaCl RIH W/ OTIS ?KR ON W/L. SET @X 8910' (WLM) . POOH. R/D ATLAS. R/U WEATHERFORD. RIH W/ 5-1/2" 17# 13 CR FOX TBG. M/U 4-1/2" TAIL ASS', BAKER PKR ASS'Y. RIH W/ 5-1/2" TBG. M/U OTIS SSSV. TEST CNTRL LINES. RIH W/ TBG. WAIT ON FMC TO LAND TBG. NOTE: ON JULY 24, 1991: R/U SCHLUMBERGER. LOG W/ CET/CBT F/ 6000'-10160'. LOG W/ GCT F/ 40'-10112'. R/D SCHLUMBERGER. SECURE WELL. DAILY:S192,579 CUM:$2,396,048 ETD:S2,246,179 EFC:$3,159,869 NDNU: 6.0 RCMP: 12.0 07/27/91 (22) RIG RELEASED @ 22:30 HRS. 9-5/8"@ 9651' MW:10.0 NaCl TD:10211 LAND TBG HGR. DISP W/ SEAWATER. SET PKR. SHEAR SEAL PB:10160 ASS'Y. PUMP 140 BBLS DIESEL DN TBG. TEST TBG, ANNULUS. SUPV:SMS LAND TBG. N/D BOPE. N/U TREE. TEST TREE. INSTALL BPV. SECURE WELL. RIG RELEASED @ 22:30 HRS, 7/26/91. DAILY:S433,412 CUM:$2;829,460 ETD:S2,679,591 EFC:$3,159,869 ?I-~° SUB - S URFA CE DIRECTIONAL SURVEY r~ UIDANCE · F~'] ONTINUOUS r~ OOL -~asf<a. Oil.,,.,,." 6a.s Cons. Com~f~,.~,,o,,' '""~" Company ARCO A.LAS~ INC. . Well Name D.S. 3-35 (1846'FSL~700'FWL~SEC 11~T11N;l~Z~) Field/Location P.R. UDHOE BAY~ NORTH SLOPE~ ALASI(A Job Reference No. 74771 Loqqed By: SCHWARTZ Date 24-JUL-91 Computed By: S. DEES GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 24-JUL-91 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. ENGINEER: SCHWARTZ Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 48 DEG 34 MIN EAST COMPUTATION DATE: 8-OCT-91 PAGE 1 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 O0 0 O0 100 O0 2O0 O0 299 99 399 99 499 99 599 94 699 55 798 52 896 26 -60 O0 0 0 40 O0 0 34 140 O0 0 16 239 99 0 18 339 99 0 17 439 99 0 29 539 9~ 3 7 639 55 7 1 738 52 9 57 836 26 13 40 N 0 0 E 0.00 N 49 58 W -0.53 N 57 6 W -0.96 S 25 11 E -0.81 S 45 42 E -0.42 S 30 51 E -0.05 S 31 17 E 2.74 S 43 28 E 11.18 S 46 38 E 25.38 S 45 38 E 46.43 0 O0 0 45 1 O5 0 O1 0 24 2 O2 2 68 3 59 617 2 88 0 O0 N 0 34 N 0 82 N 0 39 N 0 lOS 031 S 2 99 S 9 64 S 19 65 S 34 14 S 0 O0 E 0 40 W 0 57 W 0 74 W 0 65 W 0 34 W 1 01 E 6 40 E 16 51 E 3i 86, E 0 O0 N 0 0 E 0 0 0 0 0 3 25 46 53 N 49 52 W 99 N 34 44 W 84 N 62 19 W 65 S 81 12 W 46 S 47 42 W 16 S t8 34 E 57 S 33 35 E 67 S 40 2 E 65 S 42 58 E lo00.00 1100.00 1088 120o.00 1182 1300.00 1276 1400.00 1368 1500.00 1460 1600.00 1552 1700.00 1643 1800.00 1732 1900.00 1820 993 OO 933.00 15 30 55 1028.55 18 42 82 1122.82 20 31 13 1216.13 21 30 77 1308 77 22 37 81 140o 81 23 21 40 1492 40 24 5 16 1583 16 25 50 14 1672 14 28 8 31 176o 31 27 50 S 41 40 E 71.61 S 40 59 E 100.82 S 41 47 E 133.89 S 42 51 E 169,65 S 44 51 E 207.15 S 46 30 E 246.21 S 46 29 E 286,33 S 45 24 E 328.25 S 46 5 E 373,81 S 49 55 E 420.96 2 34 1 45 2 26 1 21 1 46 0 45 0 99 2 9O 1 57 2 09 52 45 S 49,22 E 74 99 126 153 180 208 237 269 301 71 93 S 43 11 E 69 S 68.55 E 101 75 S 90.53 E 134 32 S 114.78 E 170 52 S 140.79 E 208 76 S 168.84 E 247 36 S 198.00 E 287 51 S 228.18 E 329 52 S 260.69 E 374 16 S 295.65 E 422 37 S 42 33 E 71 S 42 14 E 68 S 42 16 E 30 S 42 31 E 35 S 43 3 E 43 S 43 32 E 36 S 43 51 E 97 S 44 3 E 03 S 44 28 E 2000.00 1909 53 1849 53 25 38 2100.00 2000 2200.00 2092 2300.00 2184 2400.00 2277 2500.00 2369 2600.00 2458 2700.00 2547 2800.00 2636 2900.00 2725 21 1940 O7 2O32 72 2124 40 2217 O0 2309 9O 2398 95 2487 85 2576 46 2665 21 24 4 07 22 33 72 21 56 4O 22 25 O0 24 55 9O 26 46 95 27 13 85 27 15 46 28 0 S 51 17 E S 49 24 E S 46 52 E S 46 52 E S 47 59 E S 49 7 E S 50 6 E S 50 22 E S 49 30 E S 50 29 E 466 06 508 18 547 71 585 30 622 85 662 94 706 71 752 19 797 96 844 30 1 92 2 33 1 96 0 50 1 91 2 67 1 30 0 40 0.35 0.88 329 63 S 330.69 E 466 92 S 45 5 E 356 382 4O8 434 460 488 517 547 577 44 S 363.21 E 508 85 S 392.62 E 548 68 S 419.96 E 585 06 S 447 63 E 623 56 S 477 71 E 663 99 S 511 02 E 707 99 S 546 08 E 752 44 S 581 13 E 798 34 S 616 55 E 844 89 S 45 32 E 38 S 45 43 E 99 S 45 47 E 53 S 45 53 E 57 S 46 3 E 28 S 46 16 E 67 S 46 31 E 38 S 46 43 E 66 S 46 53 E 3000.00 2813 75 2753 75 27 51 3100.00 2902 3200.00 2991 3300.00 3079 3400.00 3169 3500.00 3258 3600.00 3347 3700.00 3436 3800.00 3525 3900.00 3615 38 2842 02 2931 52 3019 02 3109 77 3198 89 3287 73 3376 76 3465 14 3555 38 27 26 02 27 45 52 27 27 02 25 45 77 26 36 89 27 14 73 27 21 76 26 46 14 26 19 S 51 17 E 891 21 S 51 29 E 937 S 51 5 E 983 S 50 1 E 1030 S 49 5 E 1074 S 50 24 E 1118 S 52 39 E 1164 S 54 8 E 1209 S 53 18 E 1255 S 52 37 E 1300 48 70 24 83 92 21 94 28 O0 0.52 0.13 0.44 1 70 0 27 1 31 1 29 0 12 0 64 1 04 606.92 S 653 02 E 891 50 S 47 6 E 635.81 S 689 664 74 S 725 694 31 S 761 723 26 S 795 751 84 S 828 780 06 S 864 807 28 S 901 834 15 S 938 861 18 S 973 23 E 937 34 E 983 31 E 1030 23 E 1074 81 E 1119 32 E 1164 29 E 1209 05 E 1255 85 E 1300 70 S 47 19 E 87 S 47 30 E 37 S 47 38 E 94 S 47 43 E 02 S 47 47 E 28 S 47 56 E 97 S 48 9 E 29 S 48 21 E O0 S 48 31 E COMPUTATION DATE: 8-0CT-91 PAGE 2 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-g1 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000.00 3704 90 3644.90 26 14 4100.00 3794 4200.00 3883 4300.00 3972 4400.00 4061 4500.00 4151 4600.00 4240 4700.00 4329 4800.00 4418 4900.00 4508 41 3734.41 26 51 56 3823.56 26 57 73 3912 73 26 55 91 4001 91 26 52 11 4091 11 26 50 30 4180 30 26 54 49 4269 49 26 44 89 4358 89 26 33 30 4448 30 26 40 S 52 0 E 1343 99 S 53 10 E 1388 S 51 43 E 1433 S 51 5 E 1478 S 50 57 E 1524 S 50 48 E 1569 S 50 1 E 1614 S 49 38 E 1659 S 49 31 E 1704 S 49 15 E 1749 46 66 87 07 23 42 63 44 22 0 55 0 98 0 76 0 18 0 12 0 58 0 35 0 48 0 08 0 33 888 16 S 1008 70 E 1343,99 S 48 38 E 915 942 971 999 1028 1056 1086 1115 1144 28 S 1044 81 S 1080 11 S 1115 58 S 1150 08 S 1185 89 S 1220 12 S 1254 17 S 1289 31 S 1323 08 E 1388 07 E 1433 39 E 1478 55 E 1524 64 E 1569 48 E 1614 99 E 1659 11 E 1704 13 E 1749 ,46 S 48 46 E 68 S 48 53 E 9O S 48 57 E 12 S 49 1 E 29 S 49 4 E 5O S 49 7 E 71 S 49 8 E 52 S 49 B E 31 S 49 9 E 5000.00 4597 65 4537.65 26 39 5100.00 4686 5200.00 4775 5300.00 4864 5400,00 4953 5500.00 5042 5600.00 5130 5700.00 5218 5800.00 5307 5900.00 5396 97 4626.97 26 57 98 4715.98 27 12 97 4804.97 27 7 70 4893,70 27 50 01 4982.01 28 7 20 5070.20 27 58 71 5158.71 27 31 52 5247.52 27 13 38 5336.38 27 24 S 49 42 E 1794.13 S 50 10 E 1839.07 S 49 54 E 1884.63 S 51 13 E 1930 22 S 51 18 E 1976 28 S 51 10 E 2023 14 S 51 2 E 2070 24 S 50 40 E 2116 75 S 50 11 E 2162 69 S 50 7 E 2208 55 0.76 0.44 0.17 1.13 0.42 0.56 0.71 0.59 O.62 0.74 1173 57 S 1357.19 E 1794 23 S 49 9 E 1202 1231 1260 1289 1318 1348 1377 1407 1436 43 S 1391.66 E 1839 69 S 1426.61 E 1884 80 S 1461.72 E 1930 47 S 1497.85 E 1976 90 S 1534.38 E 2023 45 S 1571.12 E 2070 86 S 1607.20 E 2116 14 S 1642.62 E 2162 54 S 1677.85 E 2208 17 S 49 10 E 75 S 49 12 E 35 S 49 13 E 43 S 49 17 E 32 S 49 19 E 45 S 49 22 E 98 S 49 24 E 93 S 49 25 E 81 S 49 26 E 6000.00 5484.96 5424.96 27 41 6100.00 5573.58 5513 58 27 41 6200.00 5661.99 5601 6300 O0 5750.36 5690 6400 O0 5838.91 5778 6500 O0 5927.56 5867 6600 O0 6016.43 5956 6700 O0 6105.03 6045 6800 O0 6193.58 6133 6900 O0 6282.04 6222 99 27 57 36 27 45 91 27 44 56 27 17 43 27 28 03 27 40 58 27 43 04 27 53 S 49 45 E 2254.93 S 50 2 E 2301.26 S 50 58 E 2347.96 S 50 34 E 2394.71 S 50 20 E 2441.15 S 49 39 E 2487.41 S 50 14 E 2533.26 S 50 13 E 2579.60 S 50 16 E 2626.05 S 50 4 E 2672.65 041 1 14 0 26 0 44 0 26 0 50 1 14 0 54 0 66 0 59 1466 43 S 1713 33 E 2255 20 S 49 26 E 1496 34 S 1748 1525 90 S 1784 1555 48 S 1821 1585 07 S 1856 1614 80 S 1892 1644 41 S 1927 1673.98 S 1963 1703.71 S 1998 1733.58 S 2034 72 E 2301 92 E 2348 18 E 2395 99 E 2441 45 E 2487 47 E 2533 18 E 2579 90 E 2626 70 E 2673 53 S 49 27 E 25 S 49 28 E 04 S 49 30 E 49 S 49 31 E 76 S 49 32 E 62 S 49 32 E 98 S 49 33 E 45 S 49 33 E 07 S 49 34 E 7000 O0 6370.57 6310 57 27 33 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 6459.10 6399 O0 6547.66 6487 O0 6636.22 6576 O0 6724.72 6664 O0 6813.13 6753 O0 6901.20 6841 O0 6989.39 6929 O0 7077.64 7017 O0 7166.09 7106 10 27 43 66 27 35 22 27 40 72 27 47 13 28 2 20 28 13 39 28 1 64 27 59 09 27 47 S 50 11 E 2719 15 S 50 7 E 2765 S 50 11 E 2812 S 49 0 E 2858 S 47 57 E 2905 S 47 38 E 2951 S 47 15 E 2999 S 47 30 E 3046 S 47 28 E 3093 S 47 20 E 3139 64 06 49 04 77 14 26 28 93 0.38 0.56 0.55 1 .00 0.43 0.61 0.75 0.39 I .42 0.27 1763.39 S 2070 41 E 2719 58 S 49 35 E 1793.21 S 2106 1822.96 S 2141 1852.97 S 2177 1883.97 S 2211 1915.32 S 2246 1947.42 S 2281 1979.32 S 2316 2011.13 S 2350 2042.70 S 2385 08 E 2766 75 E 2812 19 E 2858 91 E 29O5 58 E 2952 42 E 2999 12 E 3046 76 E 3093 12 E 3140 O8 S 49 35 E 52 S 49 36 E 96 S 49 36 E 50 S 49 35 E 21 S 49 33 E 55 S 49 31 E 66 S 49 29 E 66 S 49 27 E 29 S 49 25 E COMPUTATION DATE: 8-0CT-91 PAGE 3 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 8000.00 7254 62 7194 62 27 38 8100 O0 7343 26 7283 8200 O0 7431 79 7371 8300 O0 7520 30 7460 8400 O0 7608 85 7548 8500 O0 7697 20 7637 8600 O0 7785.65 7725 8700.00 7873.97 7813 8800.00 7962.11 7902 8900.00 8050.52 7990 S 47 6 E 3186 42 26 27 31 S 46 55 E 3232 79 27 54 S 46 35 E 3279 30 27 33 S 46 27 E 3325 85 27 50 S 45 37 E 3372 20 27 58 S 44 36 E 3418 65 27 52 S 44 32 E 3465 97 27 59 S 44 50 E 3512 11 28 1 S 45 5 E 3559 52 27 46 S 45 16 E 3605 69 17 68 10 85 39 19 32 97 0 20 0 32 0 27 0 35 0 38 0 38 0 92 091 0 97 0 66 2074 30 S 2419 23 E 3186 75 S 49 23 E 2105 2137 2169 2202 2235 2268 2301 2335 2368 86 S 2453 69 S 2486 74 S 252O O2 S 2554 11 S 2587 37 S 2620 77 S 2652 21 S 2686 18 S 2719 09 E 3233 99 E 3279 74 E 3325 16 E 3372 31 E 3419 02 E 3465 97 E 3512 32 E 3559 44 E 3606 O0 S 49 21 E 46 S 49 19 E 94 S 49 17 E 34 S 49 14 E 05 S 49 11E 55 S 49 7 E 32 S 49 3 E 43 S 49 0 E 05 S 48 57 E 9000.00 8139.24 8079 24 27 24 9100.00 8228.01 8168 9200.00 8316.96 8256 9300.00 8406.06 8346 9400.00 8495.42 8435 9500.00 8584.95 8524 9600.00 8674.50 8614 9700.00 8764.16 8704 9800.00 8853.86 8793 9900.00 8943.91 8883 01 27 22 96 27 8 O6 26 48 42 26 25 95 26 30 50 26 18 16 26 22 86 26 1 91 25 34 S 45 40 E 3652 03 S 45 49 E 3698 S 46 8 E 3743 S 46 7 E 3789 S 46 1E 3833 S 45 54 E 3878 S 45 45 E 3922 S 45 41 E 3967 S 45 54 E 4011 S 46 2 E 4054 03 67 O3 88 38 82 06 21 66 0.33 0.15 0.53 0.79 0.44 0.00 0.43 0.41 0.85 0.59 2400 57 S 2752 29 E 3652 10 S 48 54 E 2432 2464 2495 2527 2558 2589 2620 2650 2681 69 S 2785 46 S 2818 94 S 2850 O6 S 2883 03 S 2915 07 S 2947 01 S 2978 81 S 3010 02 S 3041 30 E 3698 13 E 3743 84 E 3789 19 E 3833 21 E 3878 09 E 3922 79 E 3967 49 E 4011 78 E 4054 09 S 48 52 E 72 S 48 50 E 06 S 48 48 E 90 S 48 46 E 40 S 48 44 E 83 S 48 42 E 07 S 48 40 E 21 S 48 38 E 67 S 48 36 E 10000.00 9034.23 8974.23 25 15 10100.00 9124.93 9064.93 24 30 10200.00 9215.97 9155.97 24 24 10211.00 9225.99 9165.99 24 24 S 46 16 E 4097.54 S 46 26 E 4139.63 S 46 34 E 4180.84 S 46 34 E 4185.39 0.62 0.83 0.00 0.00 2710.74 S 3072.75 E 4097.55 S 48 35 E 2739.84 S 3103.19 E 4139.63 S 48 33 E 2768.19 S 3133.14 E 4180.84 S 48 32 E 2771.31 S 3136.44 E 4185.39 S 48 32 E COMPUTATION DATE: 8-0CT-91 PAGE 4 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ FEET DEG/IO0 FEET FEET FEET DEG 0.00 1000.00 993 2000.00 1909 3000.00 2813 4000.00 3704 5000.00 4597 6000.00 5484 7000.00 637O 8000.00 7254 9000.00 8139 O0 933 53 1849 75 2753 90 3644 65 4537 96 5424 57 6310 62 7194 24 8079 0 O0 -60 O0 0 0 O0 15 30 53 25 38 75 27 51 90 26 14 65 26 39 96 27 41 57 27 33 62 27 38 24 27 24 N 0 0 E 0 O0 S 41 40 E 71 61 S 51 17 E 466 O6 S 51 17 E 891 21 S 52 0 E 1343 99 S 49 42 E 1794 13 S 49 45 E 2254 93 S 50 it E 2719 15 S 47 6 E 3186.42 S 45 40 E 3652.03 0.00 2.34 1 .92 0.52 0.55 0.76 0.41 0.38 0.20 0,33 0.00 N 52.45 S 49 329.63 S 330 606.92 S 653 888.16 S 1008 1173.57 S 1357 1466.43 S 1713 1763.39 S 2070 2074.30 S 2419 2400.57 S 2752 0 O0 E 22 E 71 69 E 466 02 E 891 70 E 1343 19 E 1794 33 E 2255 41 E 27t9 23 E 3186 29 E 3652 0 O0 N 0 0 E 93 S 43 11 E 92 S 45 5 E 50 S 47 6 E 99 S 48 38 E 23 S 49 9 E 20 S 49 26 E 58 S 49 35 E 75 S 49 23 E lO S 48 54 E 10000.00 9034.23 8974.23 25 15 S 46 16 E 4097.54 0.62 2710.74 S 3072.75 E 4097.55 S 48 35 E 10211.00 9225.99 9165.99 24 24 S 46 34 E 4185.39 0.00 2771.31 S 3136.44 E 4185.39 S 48 32 E COMPUTATION DATE: 8-0CT-91 PAGE 5 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN lO0 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 60 O0 160 O0 260 O0 360 01 460 01 560 O2 660.22 761.00 862.76 0.00 60.00 0 160.00 100 260.00 200 360.00 300 460.00 4OO 560.00 500 660.00 600 760.00 700 860.00 800 -60 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 12 43 0 0 N 0 0 E 0 29 N 48 54 W 0 16 N 16 8 E 0 24 S 9 22 W 0 18 S 0 15 E 0 8 S 77 23 E 1 58 S 25 55 E 5 15 S 39 59 E 8 13 S 45 35 E S 46 36 E 0 O0 -0 13 -0 81 -1 O0 -0 59 -0 22 10a 6 92 19 30 37 94 0 I 00 1 66 0 60 0 94 0 50 0 02 3 20 4 85 2 14 2 69 0 6 15 28 0 O0 N 0 10 N 0 65 N 0 62 N 0 08 N 195 41 S 46 S 43 S 25 S 0 O0 E 0 08 W 0 51 w 078w 0 72 W 0 46 W 0 14 E 3 52 E 12 12 E 25 67 E 0 0 1 7 19 38 0 O0 N 0 0 E 0 13 N 40 20 W 0 83 N 38 7 W I O0 N 51 33 W 73 N 83 44 W 50 S 67 37 W 42 S 5 43 E 36 S 28 37 E 62 S 38 9 E 17 S 42 16 E 965.80 1069.92 1060 1175.67 1160 1282.67 1260 1390.50 1360 1499.12 1460 1608.33 1560 1718.73 1660 1831.62 1760 1944.75 1860 960 O0 900.00 14 54 S 42 57 E O0 1000.00 17 52 S 40 52 E O0 1100.00 19 59 S 41 23 E O0 1200.00 21 20 S 42 37 E O0 1300.00 22 32 S 44 35 E O0 1400.00 23 20 5 46 30 E O0 1500.00 24 10 S 46 26 E O0 1600.00 26 23 S 45 12 E O0 1700.00 28 17 S 47 3 E O0 1800.00 27 5 5 51 7 E 62 70 91 44 125 52 163 35 203 50 245 86 289 74 336 44 388 75 441 61 1 .90 3.99 2.26 O.97 1 .20 0.45 1 .00 3.16 1 .83 2.51 45 82 S 67 93 121 150 180 210 243 279 314 43 19 E 54 S 62 45 S 84 67 S 110 93 S 138 52 S 168 71 S 200 28 S 234 80 S 271 31 S 311 62 97 S 43 19 E 35 E 91 94 E 126 48 E 164 22 E 204 59 E 247 47 E 29O 01E 337 54 E 389 60 E 442 92 S 42 43 E 28 S 42 16 E 35 S 42 14 E 65 S 42 29 E O0 S 43 3 E 84 S 43 34 E 56 S 43 53 E 91 S 44 8 E 59 S 44 45 E 2055.79 1960 O0 1900 O0 24 53 2165.21 2060 2273.35 2160 2381.19 2260 2490.07 2360 2601.23 2460 2713.55 2560 2826.06 2660 2939.13 2760 3052.24 2860 O0 2000 O0 2100 O0 22O0 O0 2300 O0 2400 O0 2500 O0 2600 O0 2700 S 50 27 E O0 23 4 S 47 37 E O0 21 57 S 46 35 E O0 22 9 S 47 47 E O0 24 40 S 49 3 E O0 26 47 S 50 7 E O0 27 14 S 50 17 E O0 27 23 S 49 31 E O0 28 4 S 50 56 E S 51 27 E O0 2800.00 27 33 489 83 534 22 575 35 615 70 658 74 707 27 758 38 809 93 862 69 91548 72 51 35 1,4 80 29 42 O0 47 8O 344 64 S 349 15 E 490 59 S 45 22 E 373 401 429 457 489 521 555 588 622 69 S 382 85 S 412 27 S 442 82 S 474 34 S 511 94 S 550 21 S 590 99 S 630 09 S 672 72 E 534 71E 576 33 E 616 54 E 659 44 E 707 85 E 758 23 E 810 79 E 863 O0 E 915 90 S 45 41 E 03 S 45 46 E 38 S 45 52 E 38 S 46 2 E 83 S 46 16 E 85 S 46 33 E 33 S 46 45 E 02 S 46 58 E 73 S 47 13 E 3164.97 2960.00 2900 O0 27 37 3277.98 3060.00 3000 3389.97 3160 O0 3100 3501.38 3260 O0 3200 3613.61 3360 O0 3300 3726.19 3460 O0 3400 3838.35 3560 O0 3500 3949.98 3660 O0 3600 4061.49 3760 O0 3700 4173.57 3860 O0 3800 O0 27 44 O0 25 49 O0 26 37 O0 27 17 O0 27 17 O0 26 47 O0 26 4 O0 26 30 O0 26 58 S 51 15 E 967.45 S 50 14 E 1020.04 S 49 8 E 1070.45 S 50 26 E 1119.53 S 53 1 E 1170.42 S 54 5 E 1221.89 S 53 1 E 1272.50 S 52 14 E 1321.99 S 52 42 E 1371.22 S 52 11 E 1421.70 0 46 1 13 071 1 32 1 44 0 44 0 43 051 1 20 1 03 654.54 S 712 67 E 967 63 S 47 26 E 687.77 S 753 72O.4O S 791 752.24 S 829 783.84 S 869 814.33 S 911 844.51 S 951 874.62 S 991 904.86 S 1030 49 E 1020 92 E 1070 29 E 1119 27 E 1170 02 E 1221 87 E 1272 31E 1321 29 E 1371 935.43 S 1070.64 E 1421 18 S 47 37 E 57 S 47 42 E 64 S 47 47 E 49 S 47 57 E 92 S 48 12 E 50 S 48 25 E 99 S 48 35 E 23 S 48 43 E 72 S 48 51 E COMPUTATION DATE: 8-0CT-91 PAGE 6 ARCO ALASKA INC. D.5. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY; 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTP: DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTh FEET DEG/IO0 FEET FEET FEET DEG MIN 4285 73 3960 O0 3900 O0 26 54 4397 4509 4622 4734 4845 4957 5069 5182 5294 86 4060 96 4160 09 4260 14 4360 96 4460 86 4560 77 4660 03 4760 41 486O O0 4000 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 O0 4700 O0 4800 O0 26 52 O0 26 50 O0 26 56 O0 26 38 O0 26 36 O0 26 43 00 26 46 O0 27 12 O0 27 7 S 51 6 E 1472 41 S 50 57 E 1523 S 50 43 E 1573 S 49 51 E 1624 S 49 39 E 1674 S 49 28 E 1725 S 49 16 E 1775 S 50 11 E t825 S 49 58 E 1876 S 51 5 E 1927 10 73 42 96 O0 21 42 42 68 021 0 10 0 58 0 46 0 18 0 23 0 45 0 77 0 25 1 19 967.06 S 1110 36 E 1472 45 S 48 57 E 998.97 S 1149 1030.93 S 1189 1063.33 S 1228 1096.05 S 1266 1128.53 S 1304 1161.28 S 1342 1193.69 S 1381 1226.40 S 1420 1259.21 S 1459 8O E 1523 12 E 1573 13 E 1624 67 E 1675 74 E 1725 8O E 1775 17 E 1825 32 E 1876 73 E 1927 15 S 49 1 E 79 S 49 5 E 50 S 49 7 E 04 S 49 8 E 09 S 49 9 E 30 S 49 9 E 52 S 49 10 E 53 S 49 11 E 80 S 49 13 E 5407.12 4960 O0 4900 O0 27 51 5520.40 5060 5633.71 5160 5746.52 5260 5859.04 536O 5971.80 5460 6084.67 5560 6197.75 5660 6310.89 5760 6423.82 5860 O0 5000 O0 5100 O0 52O0 O0 5300 O0 5400 O0 5500 O0 5600 00 5700 O0 5800 O0 28 11 O0 27 48 O0 27 23 O0 27 20 O0 27 45 O0 27 35 O0 27 57 O0 27 43 O0 27 43 S 51 14 E 1979 59 S 51 14 E 2032 S 50 51 E 2086 S 50 27 E 2138 S 50 10 E 2189 S 49 49 E 2241 S 49 48 E 2294 S 50 59 E 2346 S 50 30 E 2399 S 50 14 E 2452 76 O0 18 74 82 14 90 78 23 0.23 0.27 0.49 0 34 0 09 0 11 041 0 27 0 29 041 1291.54 S 1500 44 E 1979.75 S 49 17 E 1324.93 S 1541 1358.39 S 1583 1391.48 S 1623 1424.48 S 1663 1457.96 S 1703 1491.76 S 1743 1525.24 S 1784 1558.70 S 1825 1592.16 S 1865 88 E 2032.94 S 49 20 E 36 E 2086.21 S 49 22 E 75 E 2138.41 S 49 24 E 40 E 2189.98 S 49 25 E 31 E 2242.08 S 49 26 E 26 E 2294.41 S 49 27 E 10 E 2347.20 S 49 28 E 09 E 2400.10 S 49 30 E 52 E 2452.57 S 49 31 E 6536 49 5960 O0 5900 O0 27 15 6649 6762 6875 6988 7101 7213 7326 7439 7553 16 6060 08 6160 06 6260 08 6360 02 6460 93 6560 86 6660 88 6760 O0 6000 O0 6100 O0 62O0 O0 6300 O0 6400 O0 6500 O0 6600 O0 6700 O0 27 40 O0 27 41 O0 27 53 O0 27 34 O0 27 43 O0 27 37 O0 27 44 O0 27 49 19 6860.00 6800.00 28 24 S 49 36 E 2504.12 S 50 30 E 2556.02 S 50 14 E 2608.43 S 50 6 E 2660.99 S 50 10 E 2713 64 S 50 8 E 2766 11 S 50 10 E 2818 51 S 48 26 E 2870 97 S 48 2 E 2923 63 S 47 16 E 2976 91 0 46 0 48 0 5O 081 0 40 0 0 1 0 1 55 55 32 15 O4 1625.63 S 1905.18 E 2504 47 S 49 32 E 1658.93 S 1945.02 E 2556 1692.44 S 1985.35 E 2608 1726.09 S 2025.75 E 2661 1759.86 S 2066.17 E 2714 1793.52 S 2106.45 E 2766 1827.10 S 2146.70 E 2818 1861.21 S 2186.57 E 2871 1896.42 S 2225.73 E 2924 1932.32 S 2265.11 E 2977 39 S 49 32 E 82 S 49 33 E 40 S 49 34 E 07 S 49 35 E 55 S 49 35 E 97 S 49 36 E 44 S 49 36 E 09 S 49 34 E 34 S 49 32 E 7666 70 6960 O0 6900.00 28 5 7780 7893 8006 8118 8231 8344 8457 8571 8684 01 7O6O 12 7160 07 7260 88 7360 91 7460 79 7560 87 766O O0 7760 19 786O O0 7000.00 28 4 O0 7100.00 27 48 O0 7200 O0 27 38 O0 7300 O0 27 33 O0 7400 O0 27 49 O0 7500 O0 27 41 O0 7600 O0 27 58 O0 7700 O0 27 42 O0 7800 O0 27 56 S 47 28 E 3030 61 S 47 27 E 3083 S 47 22 E 3136 S 47 5 E 3189 S 46 55 E 3241 S 46 30 E 3294 S 46 1 E 3346 S 44 55 E 3399 S 44 27 E 3451 S 44 46 E 3504 89 72 23 41 O8 41 14 90 79 0.61 0.97 0.24 0.17 0.41 0.55 0.91 0.83 0.14 0.65 1968.74 S 2304.58 E 3031 02 S 49 30 E 2004.77 S 2343.84 E 3084 2040.53 S 2382.75 E 3137 2076.22 S 2421.29 E 3189 2111.82 S 2459.46 E 3241 2147.95 S 2497.82 E 3294 2184.09 S 2535.73 E 3346 2221.07 S 2573.41 E 3399 2258.73 S 2610.55 E 3452 2296.51 S 2647.75 E 3504 27 S 49 28 E 08 S 49 25 E 57 S 49 23 E 72 S 49 21 E 36 S 49 18 E 66 S 49 16 E 35 S 49 12 E 07 S 49 8 E 93 S 49 4 E COMPUTATION DATE: 8-0CT-91 PAGE 7 ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPT~ TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUT~ DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8797 61 7960.00 7900 O0 28 2 8910 9023 9136 9248 9360 9472 9583 9695 9806 71 8060.00 8000 38 8160.00 8100 01 8260.00 8200 35 8360.00 8300 39 8460.00 8400 12 8560.00 8500 82 8660.00 8600 36 8760.00 8700 83 8860.00 8800 O0 27 41 O0 27 27 O0 27 13 O0 27 0 O0 26 49 O0 26 30 O0 26 21 O0 26 23 O0 25 59 S 45 5 E 3558 2O S 45 18 E 3610 S 45 45 E 3662 S 45 52 E 3714 5 46 6 E 3765 S 46 5 E 3816 S 45 56 E 3865 S 45 44 E 3915 S 45 39 E 3965 S 45 55 E 4014 94 79 53 67 15 96 66 01 20 0.99 0 80 0 3O 0 83 0 56 0 49 0 07 0 46 0 37 07t 2334.42 S 2685 52 E 3558 31 S 49 0 E 2371 68 S 2722 2408 2444 2479 2514 2549 2584 2618 2652 O9 S 2760 2O S 2797 72 S 2834 74 S 2870 38 S 2906 06 S 2941 58 S 2977 88 S 3012 97 E 3611 O0 E 3662 14 E 3714 O0 E 3765 42 E 3816 28 E 3865 96 E 3915 32 E 3965 02 S 48 57 E 85 S 48 54 E 58 S 48 51 E 71 S 48 49 E 18 S 48 47 E 98 S 48 45 E 67 S 48 42 E 02 S 48 40 E 64 E 4014.20 S 48 38 E 9917.83 8960.00 8900.00 25 30 S 46 5 E 4062.34 10028.48 9060.00 9000.00 25 6 S 46 18 E 4109,66 10138.54 9160.00 9100.00 24 24 S 46 34 E 4155.46 10211.00 9225.99 9165.99 24 24 S 46 34 E 4185.39 0.41 0.49 0.00 0.00 2686.36 S 3047.31 E 4062.34 S 48 36 E 2719.12 S 3081.51 E 4109.66 S 48 34 E 2750.72 S 3114.70 E 4155.46 S 48 33 E 2771.31 S 3136.44 E 4185.39 S 48 32 E COMPUTATION DATE: 8-0CT-91 PAGE 8 ARCO ALASKA ZNC. D.$. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER TOP 7" CASING BOTTOM 9 5/8" CASING ZONE 4 ZONE 3 ZONE 2 H.O./T GCT LAST READING ZONE 1 BOTTOM 7" CASING TD DATE OF SURVEY: 24-JUL-91 KELLY BUSHING ELEVATION: 60.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 1846' FSL & 700' FWL, SEC11 TllN R15E MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 9346.00 9651.00 9672.00 9882.00 9921.00 10032.00 10112.00 10135.00 10207.00 10211.00 8447 16 8720 24 8739 O7 8927 68 8962 86 9063 19 9135 85 9156 78 9222 35 9225 99 8387 16 8660 24 8679 07 8867 68 8902 86 9003 19 9075 85 9096 78 9162 35 9165.99 2510.25 S 2604.82 S 2611.32 S 2675 62 S 2687 3O S 2720 15 S 2743 27 S 2749 72 S 2770 18 S 2771 31 S 2865 75 E 2963 25 E 2969 90 E 3036 18 E 3048 29 E 3082 58 E 3106 79 E 3113.64 E 3135.24 E 3136.44 E ARCO ALASKA INC. D.S. 3-35 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER ZONE 4 TD COMPUTATION DATE: 8-0CT-91 STRATIGRAPHIC SUMMARY MEASURED DEPTH BELOW KB 9672.00 10211.00 DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: PAGE 9 24-JUL-91 60.00 FT SCHWARTZ SURFACE LOCATION = 1846' FSL & 700' FWL, SECll TllN R15E TVD RECTANGULAR COORDINATES FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 8739.07 8679.07 2611.32 S 2969.90 E 9225,99 9165.99 2771.31 S 3136.44 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG 10211.00 9225,99 9165.99 4185.39 S 48 32 E DIRECTIONAL SURVEY COMPANY ARCO ALASKA INC. F,,=U~ PRUDHOE BAY WELL D.S. 3-35 COUNTRY USA RUN ONE DATE LOGGED 24 - JUL - 91 DEPTH UNIT FEET ~=FEnENCE 74771 WELL' D.S. 3-35 (1846'FSL,700'FWL,SEC 11,T11N,R15E) HORIZONTAL PROJECTION ........................................ :::: ::::':::: :::: ........ ...i...L..L..i ...... ,...,...,...,...,...,...,...,..., ..... L..L..L] ...... L..L..L..! ...... i...i...i...! ...... ,...,...,...,...,...,...,...,..., ...... L..i._.L..[ ...... L.L..L..i ...... L..L..L..i ...... ,...,...,...,...,...,...,...,..., ...... i...i...i...! ...... L..i...L..i ..... L..L..L..i.. -'~'"~'"~'"~:::: .......,;:~:,::~'"~-'"'"~'"~"'~'~'"'"'""~'-'~ ...... ~'"'"'"'" ...... '"'""~'"~ ...... '"'~"'~"" ...... ~'"~'"~"'~ ...... ~'"'"'""~": ............... '"'"'~'"~'"'"'~"~,:, ........... [~i~ i~[i ~!! i!!! !!i~ !~i!'"?'F"!'"~ ...... F"F"!"'[ ..... !'"F"~'"~ ...... F"?!"?":::: ............ [ ................. .................... !!~! i!!!:~!~i !iii ~!i~!i~i~ ~i !!:: ~::: :::: :::~ :!:! :::: :::: ........ ................................... '"!"'??! ..... ?"?"!'"~ ...... F"F"?'-! ...... 7'"F"!"'~ ...... !"?-"F"~ .................. ........................................................... ' ........................................................................... F"F"F"!" ................................................................ --:--.~---~---: ..... :---r--~---: ..... ~---:.--:---~ ...... :---~---:---: ...... :---:---:---: ....... :.--:---:---:.--,--.:---:---~---~ ...... :---:-.-:-..: ...... :--.:...:-..: ...... t---:--.,---: ...... :..-:.-.:---: ...... :---,---:---~ ~-.-~.--:..-~ ...... :-.-:...:-'.:.-.~-..:...:--': ...... _.L..[...L..[ ...... L..L..L..[ ...... L..L..L..~ ...... ~..L..L..[ ...... !...i...L..[ ....... L..L..L..L..~..L..[_.L..~ ...... L..L..!...i ...... L..L..L..~ ...... L..L..L..L..:...L..L..L..L..:::: ::':...L..!...!...2 ...... L..L..L..~ ..... L..i...i...L.. :::~ :::: :::: :::: :::: :::: :::: :::: :::: !~!il[!!!"'!"'F"!'"~ ..... ??"F"F":::: ~ :;: ;;;; ;;;;,:i;:,:Z~; :;Z; ;::: i;;Z :i:i ....... : ;:;; iZ;; ii:: .~,. .... =;:; ~:~:~:::; ........................................ ;:~: -,i-..i-.-!---i ...... ~---r--~.--~ ...... ;--.:-.-:.-.: ....... r--:---:---: ...... i---~-.-!---i ...... i---h-.i-.-i ...... i...i---~--.i ...... i--.i.--i-.-i ...... !---i---i---i ...... i---!--.i-.-! ..... i-.-i--.i---i ....... i---!--.i,-.i ..... i--.i.-4.--i ...... i'--i--'~--'i'--r"r--:---: ..... :'":'"r":'" ;::t ;::: :::; ;;:: :::: ;:;: :::: ;::: :::: :::; ;::: :::: ;::: ::;. :::: :::: '-???'! ...... ?!"?"J ...... !'"?"F"i ....... F"F"!'"~ ....... ??'Y"~ ...... F"?i'"~ ...... ?F"!"'~ ...... ?!'"!'"! ...... F"F"Y"i'": '"~-?"!'"~ ...... !'"!'"i'"; ...... i'"~"?"! ...... !'"!'"!'"i ...... Y"!'"~'"~ ..... !'"F"Y"[ ...... Y"F"!"?" ................................................................ .. .............................. ............. ...... ......._...... ......-......, ......... . ...... . ...... ............, ...... ............. ...... ........,..., ..... ....,........ ...... ............. ...... ...., ...... . ...... ,..........., ...' .......,...,..., ..... ....,........ ....... ,,..,.....,..... ................................................................ ................................................................ "'i-'Y"?'F .... Y"~"'!'"~ ..... !"'?"?! ...... !'"F'?"! ...... ;"?"'!'"~ ...... ?!"'?'~ ...... ~'"~-'~'"i ...... ~"~'"F"! ...... ??'?"~ ..... {"?"F"~ ...... i~'~'"!'°'~ ...... ;'"F"?'! ...... F"F"!'"~ ...... F"F'?"~ ..... ;' "F"F"~ ...... !"'F"?F" ................................................................ · --:---~-':'--: ..... :---:'--:--': ....... ~---:-":'-.= ...... :---:---:---: ...... :--=---:--1 ...... :---:---;---: ...... =---;~-:.--t ...... :.--:-..:..-: ...... :--.:---:-'-: ..... :--~~--.=-.-: ....... =.--:-.-;-..~ ...... =.--:.-.;--': ...... :-..:..':...:'..,..':...:.',:'--: ...... :---:---:"-: ...... :---:--':-'-:--- ;;:: :;;: ;;;; ;;:; :;;; ;;:: ;:;; ;;;; :;:, :,;: ;;:; :;;; ::;;,:; ..... : "','",'","',"',"',"',","','",'",'",'","', ...... F'Fi"'( ...... S'~]'2'Z~' '"Z'"7'F'~ ...... FT"!'"f ...... FT'T"f ...... !"'!'"F'~ ..... FT"FT"r"'!'"F'7'! ...... !"'f'"!"'f ..... F'f'"F'~ ...... FT"F'! ..... !'"f"':'"! ....... i"T --i-'-i---i---i--'i---hi---}---} ....... hi--hi ...... i'--i-'-hi---~~" ":~ ~'~: ~"~:~'" ~':' '~'~ ~:~' "T"F'F'i ...... FT"F'~ ...... F'F'F'F',"'FT'T"[ ...... FT"FT","T"FT"i ...... FT'T"~ ...... F'FT"i ..... FT'T": ...... i'"i ...... ~ ...... i77T'T" ,.-i---! i'i:: :i i.:j 'i ..... i---i---i---i ...... !---i---hl ...... i---i---i-.-! ...... i-.-i--.i--?~:- ~i--.i.-.i--.!.--i-.-!-.-i ...... i--.i--.i...i ...... i-..i---i--! - - ! i ...... ...... ...... ...... "'?'"'"" ..... '-'? ...... ...... ..... ?"? ...... ...... ...... ,:::i:: :::i::i:: :::i:::i:::i::i::: :::i:::}:::i:::i::: :: :::i:::i:::i::: ::: :::i:::i::: :::,::: :::i::: :::i::,:::i::: ::: :::i::: ::::i::: :::i:::i::: ~: ::: ::: ::: :::i:::i::: :::i::: ::i:::i::: r:::i:::i::i:::i::: :: :::i::: :::i::: :::i:::i::: :::i::: :::i:::}:::i:::i::: ...i--L.i..-i ...... i-.-i-..L.i ...... i.-.?-.LL!.-i---i.--i...i ...... !-.-i-.-?.i-..i...?i.-.L.i......LL?i ...... L.i...i.-.i...~z¢%--~-.i..~.--i...LLL:...L.i...i-..; ...... L?..;...i ...... L.i...i...i ...... ;...i...i...i ..... ................................................................ "-!--!---i---! ...... !-'-!--'f---! ..... h-!---!-'-! ..... !-'-f---!---~ ...... !---!---i--! ...... i'"h'h"f ...... !'"!-'!"'f ...... h'!"'!'"! ...... !-"!'"!-'f ...... !"'f'"!"'! ...... !"'!'"!"! ...... i'"h"i'"! ...... !'"i"i'"! ...... !-"!'-'!"i'""i'"!'"h'f ...... ................................................ '"~'~~"~'"! ..... !'"~"i'"~'"'"T"i'"i"'~ ..... ~'"~'"~"'i ...... ~'"~'"i"'~ ...... ............................................ !'"!"'F"! ....... i'"i-'!"'! ...... ?'F"i'"! ...... !'"!"'F"F":'"i"'Y"F"~ ...... ?'!'"!'"! ...... !'"!'"?"{"'f'"i'"i"'i ...... i'"i"?"i ..... i'"F"i'"i ....... i"'i'"i'"i'" '"~'"¢'"i ...... ?'?"?i ..... ?"i"?"i .... !'"i'"!'"~ ...... ?'?"F"! ...... Y"F"F"~ ..... ~'"i"'!'"! ...... ?'¢"'i'"! ...... i'"F"F"~ ...... F"Y"F"! ...... !"?"?'~ ...... ?!'"F"i ...... F"F"!'"! ...... i'"!'"!'"! ..... !'"!'"!"'¢ ..... ?'F"!'"!'" ............................................................ ---=.-r--=-.~ ...... ~---r.-~-.-= ..... =.--m.=-.-: ...... ~,.-m-~---= ...... =--.:---:---~ ...... ?'?"F"! ..... F"!'"?! ...... !'"~'"F'? ...... !'"F"!'"! !'"F"F"! ...... !'"Y"!'"! ...... !"'?F"! ...... Y"F"!'"? ...... !'"!'"?'!"'~'":'":'": ...... :'"~'":'"~ '~ !ii,!iil ~!ii ........... ::; ..... ;ii; ;::,; (:;: :!;: ;i:;::;; i:;: :::; :i:; ........ , .... ..................................................................................................................................... !'"!'"!'"?"'F"!'"!'"! ...... !'"!'"!'"! ...... F"!'"!"'! ...... F"F"F"?."'!'"!'"!'"~ ...... !"'F"!'"!'" :i:5:i::i:: :::i::~:i:::i::I ::::::::::::::::::::::::::::::::::::: ::::i:::i:::i:::i::: :::i:::i:::!:::i:: :::i:::i::i:::i::: :::i:::i:::i:::i::: :::i:::i:::i:::i:~ :::i:::i:::i:::i::: ::!:::i:::!::i.::: :::i:::i::: :::i::: ::::::::::::::::::::::::::::::::::::::::::::::: :i:i:::i::: ~:: ::: ::~i::: ~:I ~-!'"!'"! ...... !'"? ....... ?!"'! ...... !'"!'"!'"! ...... !'"!'"!'"! ...... !'"?'7! ...... !"'!"?! ...... !"'!'"!'"} ....::::i'"i'"i'"i ...... ~:~:i-'!"'~'"i ...... ::~:~"'i'"!'"i ...... ::::i'"i'"i'"! ...... ::::i"'!'"i'"~ ..... ::::~'"i'"~'"~ ...... :~::~'"i'"~'"i ...... ::::~'"~'"i"'~" :::: :::: :::: :::: :::: :::: :::: :::: ~::; :::: :::: :::: r;:: :::: :::: "?-?"!'"~ ...... !'"?"?!"Y"!'"?"~ ...... ??"?'! ...... !'"F"?'~ ...... ?'!'"F"! ..... ?'!-'?'! ...... !'"!"'!'"'! ..... ?"!'"!'"! ....... !"'!'"?~ ...... !'"!'"!'"? ...... !'"!'"!'"! ...... !'"F"!'"! ...... !'"!"'!'"! ...... !'"!'"F"! ...... !'"!'"!'"~ ............................................................. · ,"'f ......... f"]"~' ! ¢ ! ~'f' !"~ ! !'"'! f'! ~ ~ ~ ¢ ! '!'i f'f"; f'"!"¢ ...... !-!'"7'! ..... WELL' D.S. 3-35 (1846'FSL,700FWL,SEC 11,T11N,R15E) VERTICAL PROJECTION -2000 -10(0~ 0 0 1 (:~:X~ ~ :~0(0) ~ ~ ~O(X~ ?'i"i"i .... i"i"i-'i ...... hi-"!'"i ....... i"i"'h'~ ..... i"i~'~"i"i"i"i ...... hi-'i--i ...... i-i"i"i'""i'"i'"i"i ..... hi"i"i ..... i"i'"hi ....... ?--?i"i ...... i"i"i'"i ...... ?--?-'i--i-'-i-'i??i ..... ;::: :::: :;:: ;;:; :::: :::: !i~! ii~: ;;:; ~::: i;:: ::;: :::: ::;: ::i~ !ii: -i-!--i-.-~ ...... !--i-.i-i ...... i..-~--.!--i ...... ~--i.-iH-.' ...i...i.--L-i ..... i...i...i...i ...... i...i...i ...... i~Zj]~,o~. ...... i ......... i ........... i...i...i...i ............ i ......... i ......... i..~ ...... i...i...i ......... i..-i...i ...... -"~'-+-'~"-~ ...... }-'-~---}-~ ...... ~"+'+"}'"~"'i"i~' --i"-!'-'i--i ...... i---i---}--'i ...... i---!---i---i ...... i--i'--i~ ---!---i---!---} ..... i---i---!---} ...... i"-i'--}'--~--i...¢~....i..!...!.-.} ...... !VE~7 ~g~}"' $['C~!I' DNi'"}'"i ..... i-'-i ...... } ...... i'"}-'i--'i ...... i-"}-"i-' · -~.-~---!.--i ...... [--+--i-~ ...... i--+--!-.-i ...... !'"!'"!~'"i"i'"!"-!'","i'"~"5'"~ ...... ~--+--i-.-~ ...... ~-~---i--.5.-2~-!n..-+.-[...i...~ ...... i.--~-.-i-.-~ ...... !"i'"~'"! ...... i'"!'"!'"! ..... !"'!"i'-'~ ....... !"+"!"i ...... *'"!'"!"i'"' -..!.--!--i.--! ...... i--i--!---! ...... i---!--i-.-! ...... h-!-.i~.' .--~i---~---~--i---!--.! ...... i---!---i---! ....... !-.-!---i--.!.---~:~--i---i...i-.-i ...... i--.i-.-!---i ...... i--?--i-.i ...... ?-i-.i-.i ~.--?-i ....... i.-.!.-.?.-.~ ...... ?~--.?i--.: ........ ~ .... ~ . . ~ . . .~.~.. i .... ...LLi...i ..... ~..Li...i ...... i...i...i...i ...... L.i...i~ :::i:::i::}:::}::: :::i:::i:::i::i:::::i:::i:::i:::i:::::::i:::i:::i:::}::::::i:::~:::i:::i::::::::::::::::::::::::::::::::::...i...i...i...i ..... i--.i...i...i ..... !.--i-..i--.i ...... i...i..-i-..i ...... i---i.--i...i-. -~--~.--!---~ ...... i---i---i-i ...... i..-i.--~-.-! ...... [-.-[-..[~-~ --.~.~--~.~ .... --+-+--~--.~ ...... ~--~--+.-~ ..... i.-+..~...~ ...... ~--+-.i...~ ...... ~.-+.-~-..~-. ...... ...... ...... ...... ..... ...... ...... -.F--F--F.J ...... ~-.-~---~.--~ ...... F.~--.~--.~ ...... ~.--~---~ Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z ]~ Z Z Z ]~ ] Z Z Z ]~ ---~--.~-.-~-..~-..:.--h-~.--~-..~-.-~-.i---~-..~.--~ ..... ~..i...~-..~ ...... hi.-i-..~ ...... ~-.i--.~--.~.. ~_k..L..[...[ ..... L.L.L.[ ...... ~..L..L.} ...... ~...L]~.L.~...L.~ ...... t...~..Z..}...;...L.~...}.] ...... [_.~...L.~ ...... LL.~...} ...... ~...L.~..]...~:::~..~ ~..~..~'~:::..~...~...~...~.....~...~...~...~......~..~...~...~......~...~...~...~:::: :::: :::: .~L..L..[_L..~._L..L..L..L.~...L..L..L..~ ...... L..[...~...}...L..L..~ ...... ~...L..L] ...... L..L..L..~ ...... L..~...L..[ ...... L..L..L..~ ...... L..L..~...L. ...¢..[...[_L..._k..[...L..[ .... ~..5...~...L.~...L..~...[~....L..L..~...~ ...... L..L..L..~ ...... L..L..L..[ ...... ~_.L..L..[ ...... L..L..L..[ ...... L..L..L..~ ..... ,...~...,..., ..... . .... . ........ [ ........... i~:: :::: :::; :::: :;:: :::: :::: :::: :::: :::: ::.: :::: ~i~{~ ::: :..: :::: .--~--.~.-.~--.~ ...... ~-.~---~---~ ...... ~.--~---~---~ ...... ~---~---~---~--.~-}.--~-.-~-.-~ ...... ~-.-~-.-~---~ ...... ~.--~---~---~ ...... ~---~---~--.~ ..... ~---~---~---~ ..... ~-.-~.--L~-.-~---~..-~--.~-.-~ ...... ~---~---~---~ ..... h--~a~a,.~...~...: ...... ~.-.~.-.~...~ ...... :...~...~-..~... ................................................................. ................................................................................................................................................. :...:..~...: ..... e...:...:._~ ...... :...:...:...t ...... :...~...:...: ...... :...:...:...: ...:...:...:...:.. ..?..~...?.~ ......................................................... ..... ?~..., ...... ~...~...~...~ ...... ?., ...... ?.?..,..., ...... ?..~ ...... ~...,...?~ ...... ?.,...?..~ ..... ~...?.?.., ...... ,...~...?..~ ....... ~...,...~...~ ...... ?? ...... ?.?...~...~ ...... ,...~...?..~ :::::::::::::::::::::::::::::::::::::: .-.??--~-..~ ...... ~--.~-.-?~ ...... ?--~.--?~ .................................................................................................. :.--:-..:-..= ...... :-.-:---~--.: ....... :--.~..-:-..~ ...... :-,-r-.:...: ...... :.-.:--,:.'-: ...... :-'-:'"~-'-:" · --}..-~---h--} ...... ~---~---~-.-} ...... }---}---~--.~ ...... }---?--}---} ....... h--}---h--~ ...... }---h--~.--~ ...... ~---~--.~--} ...... ~--h.-~---} ..... h--}---h.-~--.~---~---h--h--} ...... ~---h--h.-~ ...... }---:.-.:--.~ ...... ~---~---:.,-~ ...... ~-'-~--'~---~ ..... h--h-.~-.-~ ..... :--~-.-h.-~-.. :::: :~:: ~::: :::: :::: ~:: :::::::: :~::::::: :::: :::: :::: :::: ,..~...~...~...~ ...... ~...~...~...~..,~...~...:...~...~ ...... :...:...~...~ ...... :...~...:...: ...... ~...:...~...~ ...... ~...~...~.-~ ...... ~-.~...:...: ...... ~...~...~...~..,~...~...:...:...~ ..... ~...~...~...: ...... :...~...:...~ ...... ~...~.,.:,,.: ...... :...~...:...: ..... ~...~..,~...: ..... ~..,~..,~...:... ...~...~...~.~ ....... :...~...:...~ .................. ,, ...... ............................................. , ................................. ............. .................. : ...... [ ['"~'"~ '"F"~'"[ ...... : : : :'"'"'" .......... : : : :'""'"'"" ....... : : : :'"'""'"' .......... : : : :' ....... ' ..... : , : :"": ....... ' ..... : : : :'"""'"'"'" '-~'"?'~"'??"~'"?'~'"~ ...... ?'y'?'-'~ ...... ?~'"~'"~ ...... [ ...... ~'"~'"::::'"?'??~ ...... ~'"~'"~'"~ ...... ~'"~'-~"'~ ...... ~"'?"~'"~ ...... ~'"~'"~'"~ ...... F'?'?"; ...... ;'"~'"~"'; ..... ~"?"?; ..... ........................................................ '--F--}-'-}--q ....... ~---h-.~--} ...... ~--,F--~--.} ....... }---~---h-.~ ...... }-..~---~-.~ ...... }..-~---~--~ ............................... ~ ........................................................................................ '~ .......................................... . ............................................................. ~"'~'"~'"~ ...... ~'"~'"~"! ....... h"~'"~'"~ ...... ~"'~'"~'"~ ...... ~'"~"'}'"~ ...... :'"r'"?', ...... ?'-~'-'}"! ............... ....... ~ .............. ~"'~'" .............................................................. '~-?"?"~ ...... ~'"~'"~"'~ ....... ??~'"?"'~'"~'"~'"~ ...... ?~'"~'"~ ...... ~'"~"'~"'F .... ~"'~'"~"~ ...... ?'~"'~'"?,"'Y"?~'"~ ....... ~'"~"'~'"~ ...... ~"'i'"?"[ ...... ?~"'~"? ...... ['"~"'~'"~ ..... F'?"~"'! ..... F"?"F"~ ...... ~'"~"'~"'~'", ............................................................. .............. · .??.?~ ...... ??..?.~ ..... ?;...;...~ ....... ~...;...~...; ..... ?~...~...~ ...... ??.?.?....???~ ...... ?~...~...~ ...... ???.? ...... ??..?..~ ...... ~...~...~...~ ...... y..?.?..~ ...... ?.?...~...; ...... ;...~...~...~...~...~...~...~ ...... ........................ : ................................ '"$'"~'"~'--~ ...... ~'"?-~'-'~ ...... ?-~-?'-~ ...... ?"?~-'; ...... ~"'~"-~'"~ ...... ,'","','",'",'",-'-,'",'", ...... ?"~-"?~ ....... ?~"?"g ...... ???'? ..... ?"~-'?~ ...... j'"~'"~"'g ...... ?~-'~'"[ ...... ,'",'",'",'",'",'","', ...... ................................................................ ................................................................ '"~'"~'"?~ ...... ?~'"~"'~ ...... F"F'-?~ ...... ~"'~'"~'"~ ..... ~'"~'"~'"~ ...... ?~"-F"~ ..... ~"'~'"~'-~ ...... ~'"~"'~'"~ ....... ~'"?"~'"~ ...... ~'"~'"~'"~ ...... ?'?"?"~ ...... ??'~'"~'"?"~'"~'"~ ...... ~"'~'"~"'~'":'"F"~"?"f ...... ?'~'"~"'~ ................................................ '"?'?"?~ ..... ?'?"?'~ ...... ?"?'?'~ ...... ?'?"?'~ ...... ?'?"?"~ ...... ~'"~'"~'"~ ..... U"?"?~ ...... ~'"~"'?~ ...... ~"'~"'~'"~ ...... ~'"~'"~'"~ ...... ?'?"?"~ ...... ~'"?'~'"~ ...... ~'":'"?: ..... ?'~'"~'"~ ...... ?'?"?'~ ...... ?'F"~"'~ ~-.-~,-6--.~ ..... F.-~--.~.--~ ...... ~-.~-.-~--.~ ...... ~--.~.-~---~ ..... ~--.~...}.-.F ..... ~...}-.-~..-} .... ~.-.~-.-~--~ ...... }.-.}--}.-.~ ....... ;..-h.-~...} ...... ~---~--~.-.~ ..... F-.~--.}--.~ ...... }.--}---h-.~ ...... :...h..h..~ ....... ~-.-h..h..~ ...... h-,h..~-.,~ .-~---h.-h,.~.-, ................................................................ ................................................................. '"F'~"i":~ ...... ~'"~"T"~ ...... ?"F'Fi ...... ~"T"~"'~ ..... ~'~"'"~"T"F'~ ..... ~'"~'"~'"~ ...... F'~'"F'~ ...... :"T"~'"~ ...... ~'"~'-F'~ ...... ~"'~'"~'"~ ...... ~'"~"T"~ ...... ~'"~'"~'"~ ...... ~'"?'~'"~ ...... :::: ~::: :~;: ~::F ;:::~:::: ::::':;:: :::: ;::: ::~: :::: :::: :;:: :::: --.}..-}.--~-..} ..... ~...}.-.~--.~ ...... }-..~-.-}--.} ...... ~.-,}..-}..-} ..... ~---~---}---~--~.-.h--}--R.--~ ...... }.--~--.}.-~ ....... }.-.}-.-~---~ ...... }--.~---~---~ ...... }.-.~---}-..~ ...... ~---}---~-"} ...... ~-..~---h..~ ~.--h-.}-.-~ ..... ~..-}--.}.-.~ ...... h..h-.h-.~--.~-..~..-h.,~.-, ............................................................... · ..y..?.?~ ..... ?-??.F ..... ~...~...~...~ ...... ~...~...?.-~ ..... ~..-~--.?~ ..... :...:...:...:,.. : : : : ........ .... : : : : : : : : .... '"~'"F'F'~. ....... ....... FT"F-F'.... : : : : "~"T"~'"~ ........ ...... ~"?'T"~ ..... : : : :r'?"~'"~ ...... : : : :?r'?'"~ ..... : : : :~'-~'"~'"~ ..... ~ : : :r"r'?"~ ...... : : : ~ ?"r"~ '"~'"??"? : : : : · -~.-~---:---~ ..... r.-:---~--~ ...... ~---~..-~.-.~ ...... ~-..~..-~.--~ ..... ~---~---~---: ...... ~---:--':'-~ .... ~'--:---:--~ ...... :---:-'-:'-': ...... :'--:--'~-'-:'--:-":'":"-: ................. : .......................................................... ~'"~"':"':'" :::~ ......... ::~:,::::,:~:~ ~::: ::~: :~,: :,:: ........ :t:~ :::~ :::: :::: :::: :::: ...:...:...:...: ...... :...:...:...: ...... :...:...:...: ...... :...:...:...: ..... :...:...:...: ...... :...:...:...: ....... :...:...:...: ...... :...:...:...: ..... :...:...:...: ...... :...:...:...: ...... :...:...:...: ...... :...~...:..: ..... :,..:...:...: ..... :...:..,:...~ ..... :...~..:..~ .................. :.,. · ..~--.~.-.~---~ ..... ~---~ .... ~ ...... ~---~--~---h--~---h-.~---h.-~ ..... ~.--:.--;--.~ ...... h-.h--~--~.-.:--.?--}---h-~ ...... h-q-..h--~ ...... h--?.-?--~ ...... h-.h.-h--~ .... AOGCC GEOLOGICAL idATERIALS INVENTORY LIST COMPLETION DATE ~ /, ~ I c~l CO. CONTACT check off or Ii'st data as it is received.*l!,st received d,ate for 407. if not re, quired list as NR 40~ I * ~/~[ ¢ z. dr,,.., h,sto? V ~u..e¥ ~ ] well tests O ! core descriptimJp& cored in{ervals core analysis d~ ditch intewalsdigital data LOG TYPE " RUN INTERvALs SCALE NO. (to the nearest foot~ .. [inchll IT AOGCC GEOLOGICAL MA-I'EFUALS INVEHTOFIY LIST f°'rm received received dale ' comment9 ,, 403'" yes no / / - sundry application '404 yes no repor~ Of sundr~ application ~ ............................... L ...................................................... ~ ............ ~ ................. Open required received Caged required received Productio~ required receiVed ,,h,,°le Io~j hole lo9 , I09 . . MUD OCT ~ ]EMP ~ DIL/SFL ~,-'"""~ ~ CNL PI1OD .... , , , DLL ........ CI:I I' ~ ....-~- PHESS BHC/SL '- cET .~ ~ SPIHHER -~H~,iA~J ' ~ ~ .... Ei~ ..... OTHER D~TA LSS PEFIF j' ~ Survey ~ '~ ~ IIEC ---'" ~ 'SS~ " PACKER ~ ~ Digila~ ...... J FDC- Well % CNI_ ~~ ~ ~ Te~l~ : FDC HWD ~equi~ed ~eCcivcd SAMPLES lequi~ed ~eceived MWD LDI/CNL ' d~ dilch , ,, , ML core ..... CYBER core LOOK , Anal~gis ,N~r .. ~ ,, .... , , ~.___.. STATE OF ALASKA --. ~} J~ ~ ~A ~' ALASKA AND GAS CONSERVATION C(. /IISSION /?~ REPORT uF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Pull tubing Alter casing Plugging Repair well Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1846' FSL, 700' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 835' FNL, 1675' FEL, Sec. 14, T10N, R15E, UM At effective depth At total depth 1008' FNL, 1487' FEL, Sec. 14, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-35 9. Permit number/approval number 91-80 10. APl number ~"t 50 - 029-22184 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10211' feet 9226' feet Plugs(measured) Sand top @ 9729' MD Effective depth: measured 10160' feet true vertical 9180' feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 2000# Poleset 112' 112' Sudace 3693' 13-3/8" 1425 sx CS III & 400 sx CI 'G' 3753' 3484' Production 9591' 9-5/8" 350 sx CI 'G' 9651' 8720' Liner 10157' 7" 150 sx CI 'G' 10207' 9222' Perforation depth: measured 9674-9730';9744-9799';9827-9831';9842-9868';9944-9950' true vertical 8741-8791 ';8804-8853';8879-8883';8892-8916;8984-8990' Tubing (size, grade, and measured depth) 5-1/2",17#,CR-13 tbg @ 9331' MD;4-1/2",12,6#,CR-13 tbg @ 9347'MD; 3-1/2",9,2#,CR-13 tbg @ 9824'MD Packers and SSSV (type and measured depth) 5-1/2" Baker SB-3A 194-60 pkr @ 9311' MD;7" Otis BWD pkr @ 9810' MD; Otis SSSV @ 2240'MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaqe Production orlnjection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 7275 5600 2225 -- 7850~ 8425 2900 -- Tubing Pressure 470 485 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/' ~ Title FS-2 Regional Operations Engineer Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE .,ALY REPORT OF WELL OPER, iONS DS 3-35 Perforating Operations: ARCO Alaska, Inc. perforated DS 3-35 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 2/21/91. The intervals perforated were the following: 9827'-9831'; 9842'-9868' & 9944'-9950' MD (Reference Log: Camco-GR/CCL dated 8/3/91). Production fluid was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 2/21/91. RU perforating unit, pressure tested BOP's to 3500 psi and lubricator to 2500 psi, okay. SI well, RIH and perforated 9944'-9950' MD at 1 SPF, Logged up and perforated 9857'-9868' MD at 1 SPF, POOH, and confirmed all shots fired. RIH and perforated 9842'-9857' MD at 1 SPF, Logged up and perforated 9827'-9831' MD at 4 SPF, POOH, Tool Misfired @ 9827'- 9831' MD. RIH and perforated 9827'-9831' MD at 4 SPF, POOH, and confirmed all shots fired. (ref: Camco-GR/CCL of 8/3/91).Rigged down and secured well. RDC: 4/16/92 STATE OF ALASKA ALASK/~ . AND GAS CONSERVATION REPORT uF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate · Pull tubing Alter casing , Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1846' FSL, 700' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 835' FNL, 1675' FEL, Sec. 14, T10N, R15E, UM At effective depth At total depth 1008' FNL, 1487' FEL, Sec. 14, T10N, R15E, UM 5. Type of Well Development Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 60 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-35 9, Permit number/approval number 91-80 10. APl number 50 - 029-22184 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10211 feet 9226 feet Plugs(measured) Sand top at 9729' MD. Effective depth: measured 10160 feet true vertical 9180 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 2000 # Poleset 112' 112' Surface 3693' 13-3/8" 1425 sx CS Ill & 400 sx "G" 3753' 3484' Production 9591' 9-5/8" 350 sx "G" 9651' 8720' Liner 10157' 7" 150 sx "G" 10207' 9222' Perforation depth: measured 9674-9730'; 9744-9799' true vertical 8741-8791 '; 8804-8853' Tubing (size, grade, and measured depth) 5-1/2", 17#, CR-13, Tbg @ 9331'MD; 4-1/2" 12.6 #, CR-13, Tbg @ 9347' MD; 3-1/2", 9.2#, CR-13, Tbg @ 9824' MD Packers and SSSV (type and measured depth) 5-1/2" Baker SB-3A 194-60 Packer @ 9311' MD; 7" Otis BWD Packer @ 9810' MD; Otis SSSV @ 224O' MD 13. Stimulation or cement squeeze summary [~ ~ [~ I V r' L/ Intervals treated(measured) See attached. Treatment description including volumes used and final pressure Representative Daily Averaae Production or Iniection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 3087 3991 376 -- Subsequent to operation 8607 .,' 10104 ' 2014 -- 14. Alaska Oil & Gas Cons. ComrnissiO~ Tubing Pressure 277 468 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Status of well classification as: Oil X Gas __ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE 3-35 FRACTURE TREATMENT OF ZONE 4 DESCRIPTION OF WORK COMPLETED I 2/6/91: MIRU & PT equipment to 10000 psi. Pumped a Propped Hydraulic Fracture Treatment, using 12/18 proppant, through the perforations at: 9674 - 9730' MD (Z4) Ref Log: BHCS 7/5/91. 9744 - 9799' MD (Z4) Pumped: a) 300 bbls Pre Pad, @ 55 bpm, followed by b) Shutdown. ISIP @ 1900. Resumed pumping: c) 2100 bbls Cross Linked Pad, @ 55 bpm, followed by d) 998 bbls Slurry, w/proppant concentrations of 1 to 12 ppg, followed by e) 225 bbls Flush, followed by f) Shutdown. Placed a total of 195,500 lbs of proppant into the formation. Rigged down. I 2/7/91: Performed a proppant fill cleanout to 9705' MD. I 2/8/91: RIH & tagged top of sand at 9729' MD. Returned well to production & obtained a valid production test. RECEIVED Anchorage P~O. BOX ~8~6~ ANCHORAGE , ALASKA 9 DATE' 9-t9-9t REFERENCE' ARCO CASED HOLE FINALS c,tl ii-'c/w, t-tB 8-t6-9~ COLLAR (BAKER F'ACKER) RUN ~, 5' @ x2-S 6-22-9~ PERF RECORD RUN ~ , 5' ~2-6 5-St-9~ F'ERF RECORD RUN -2-9 8-~6-9~ F'ERF RECORD RUN ~, 5" -2--26' 5-3i-9i F'ERF' RECORD RUN t , 5" ~_~-3-35' 8-6-9t PERF RECORD RUN -4-o~. 5-27-9t PERF RECORD RUN t, 5' 9-t8 8-t8-9t PERF RECORD ' RUN t, 5' ii-4 ~ ,-~9-9t F'ERF RECORD RUN t , 5' -ti-6 7-22-9t PERF RECORD RUN "-t 2-t 4 8-6-9t PERF RECORD RUN i , 5' -t 2-28 5-29-9t F'ERF RECORD RUN t , 5' .tS-28 8-i9-9t PERF RECURD RUN t, 5' $ ~t4-9B 8-2t-9t PERF RECORD RUN xt 5-25 8-t -9t PERF RECORD RUN PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIF'T OF DATA. RECEIVED BY~_~_____~ HAVE A NICE DAY! · . $ONYA WALLACE ATO-i~29~. ~ 'l '1 'i "' ' "' ~ ~F. F F,.U¥ E.I, 'I'RAN$~ 9t HLS HL$ HL$ HL$ HL.$ HLS HL$ HLS HL$ HL$ HLS HL$ HL£ HLS FIL£ HL$ HL$ HL$ HLS HL$ HLS HL$ DISTRIBUTION ~~ CENTRAL. FILES ~~ CHEVRON D & M ~~ EXTEN>? I ON EXF'LORATION ~ EXXON MARAI'HON ' MOBIL 'Ir F'HILLIF'S F'B WELL FILES R & D BPX STATE OF ALASKA TEXACO * THE CORRECT AF'I$ FOR i-lB IS 50-029-2t007-0t 8 THE CORRECT AF'I~ FOR 2-3 I$ 50-029-20077. ~-~' THE CORRECT AF'I' FOR ~.-,7~ m IS' 58-~29-2tt89. % THE CORRECT LOG INT. FOR 5-~2 I~ 88~6'-9249 $ THE CORRECT API$ FOR t4-9B IS 5~-829-2~5~4-82. RECEIVED OCT 03 1991 ARCO ALASKA, INC. F'.O. BOX t00S60 ANCHORAGE, ALASKA 99 '~'DATE' 9-6-9t REFERENCE' ARCO CASED HOLE FINALS t-9- 8-t 7-9t F'ROD PROFILE RUN 2-5- 8-8-9 t TEMPERATURE RUN 2-26- 8-8-9t PROD PROFILE RUN ~\~O~ ~$'3'5-. 8-3-9 t G R-COLLAR RUN 4-29-- 8-t0-9t PITS RUN  .~--~- S ~ e-~ e-gJ JEWELRY RUN - 7-7A- P OFZL 7- ~ ~ 8-4-9 ~ TEMPERATURE RUN 7-2~ 8--J8-9~ PROD PROFILE RUN 7-2~ 8- ~ -9 ~ TEMPERATURE RUN 7-2~ 8-3-9J F'ERF BREAKDOWN/HPFM/I'EMP RUN 9-6- 8-2-9 ~ LEAK DETECT RUN 9-~ 8- J 9-9 ~ F'I T~ RUN 9-~7~ 8-4-9~ INJ PROFILE RUN JJ-S~ 8-9-9~ INJ PROFILE RUN ~-~ 8-4-9~ LEAK DETECT RUN J J-24- 8-'4-9~ F']]T3'/HF'FM RUN ~2-3~ 8-~4-9~ LEAK DETECT RUN ~ 2-8B- 8-9-9~ F'ROD PROFILE RUN * JS-3- 8-~-9~ PROD PROFILE RUN ~S-~J- 8-~J-gJ PROD PROFILE RUN ~3-~2- 8-~5-9~ PROD PROFILE RUN JS-~4- 8'-J6--9~ PROD F'ROFILE RUN ~4-23- 8-~-9~ PROD PROFILE RUN J5-2~ 8-J4-9~ PERF BREAKDOWN TREATMENT RUN J6-~- 8-~6-9~ INU PROFILE RUN J8-3-- 8-~6-9~ LEAK DETECT RUN 1 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 2'&5' 5' 5' 5' 5' 5' CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIP'¥ OF DATA HAVE A NICE DAY! ~ONYA WALLACE AT0-t529 DI£TRIBUTION CENTRAL FILES F'HILLI F'5' CHEVRON F'B WELL FILES D & M R & D EXTENSION EX~'LORATION ~ BF'X EXXON $ STATE OF ALASKA MARATHON TEXACO MOBIL * 'I"HE CORRECTED AF'I~ F'OR t3;-3 IS 50--6,29-26,325, ARCO ALASKA, INC. F'.O. BOX iOG~&¢ ANCHORAGE, ALASKA 8-~ &-9~ REFERENCE' ARCO CASED HOLE FINALS 7-25--9 t CNL RUN 7-2;3-9t CBT RUN ~, 5' 7-2'..3-9 t CEI' RUN 7-26-9t DUAL BURST TDT-P RUN 7-24 -9t CNL RUN t, 5' 7-28--9~ DUAL BUR~T TDT-P RUN 7-24-9~ F'ERF REC RUN 7-29-9t WHIP~'I'OCK ~ETTING REC RUN 7-29-9t MECH PLUG ~ETI'ING REC RUN 7-22-9~ CNL RUN 5, 5' PLEASE SIGN AND RETURN ]"HE ATTACHED COPY AS' RECEIPT OF DATA. RECEIVED B Y ~~___ ~~~~~_ _ HAVE A NICE DAY! $ONYA WALLACE AT0-t529 APPROYED TRAN$~ 9t $CH ~CI-t S'CH ~'CH $CH $CH ~'CI--I $CI-t ~'CH ~'CI.-i DISTRIBUTION .~EN1RAL FILES CHEVRON D & M EXTEN~'ION EXF'LORATION EXXON MARAI'HON MOBIL · "' PHILLIPS '!5' F'B WELL F]]I..E~9 R & D ~ BFX STATE OF ALA~'KA TEXACO RECEIVED AUG 1 9 1997 Oil & Gas Cons. Commiss. Anchorage -DATE: 8-~ 6-9t REFERENCE' ARCO CASED HOLE FINAL,S' * 2-3 7-26-9t CNL-GR RUN ~/'~5-S2 8-~-~t COLL~R/P~CKER RUN 7-2 7-26-~t CNL-GR RUN 7-t 7 7-3t-9t COLLAR RUN 7-29 7-3 ~ -? ~ COLLAR-F'ERF RUN ?-2 0-~ -?~ TUBING CUTTER RUN ?-~ S- ~ -? ~ COLL~R-PERF RUN ?- ~ ~ 7-22-? ~ COLL~R-RERF RUN ** ?-38 7-24--?~ CNL-GR RUN ~ 2-27 7-24-? ~ CNL-GR RUN F'LFASE SIGN AND RETURN THE ATTACHED COPY A~' RECEIF'T OF DATA, F,'ECEIVED BY ~_~_ HAVE A NICE DAY! $ONYA WALLACE ATO-i 5~., AF'PROVED ~ 'i' RANS'4$ 9t DISTRIBUTION · ,--CENTRAL FILE~~ ~-'"'PHILL:[F'~' · .-CHEVRON F'B WELL_ FILE,S' D & M R & D · ,-'"' EX TEN ~' I ON EXF'LORA T I ON. -"-.,,. ~ P ;,.:.' ' ' .$ EXXON .$ .~TA'f'E OF AL. AS'KA PIARATHON TEXACO :~- MOBIL * 'i"HE CORRECTED AF'I~ FOR 2-S ]:2' 50-029-2¢077., ** 'l-HE CORRECTED AF_~ FOR.~9-3e i$ 50-6,29-2t4i t, AUG l $1991 ':41a~tra 0il ~ Sas Cons. Anchorage C°~rnissioo ARCO ALASKA, INC. F'.O. BOX i00368 ANCHORAGE, ALA£KA .- DATE: 7-26-9t I "' m ' "' ' REFE. F(EN[,E: ARCO MAGNETIC TAPE(.?) WITH LISTING(S) ~1~.~\~~ ~-~5 ?-5-9~ DIFL/GR/ZDEN/BHCA JOB:~8~;??9 F'LEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. HAYE A NICE DAY! $ONYA WALLACE ATO-~ 529 AF'F'ROVEI) TRAN$~ 9i ATLAS · DISTRIBUTION CENTRAL FILES (CH) CHEVRON D&M TAMMAS BROWN (OH/GCI') EXXON MARATHON MOBIL ~' PHILLIPS F'B WELL FILES R & D T"" BPX T~ STATE OF ALASKA TEXACO. TO: THRU: FROM: MEMORAhdUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonn~ .C1 ' DATE: July 16, 1991 Comm s on FILE NO: DA. 716 - 2 TELEPHONE NO: SUBJECT: RIG/BOPE Inspection AAI PBU DS3-35 Permit No. 91-80 Prudhoe Oil Pool Doug Amo~ Petroleum Inspector Sat~rd~a~v_=JKiy 6 1991: I traveled this date from AAI KRU to AAI PBU and conducted a RIG/BOPE inspection on Pool Rig No.6 at DS3-35 well. As the attached AOGCC inspection report indicates~ I found no non-compliance items on this inspection. II1 summary, I conducted a RIG/BOPE inspection at AAI's DS3- 35 well on Pool Rig No~ 6 and found no non-compliance items. Attachment. 02-00lA (Rev, 6/89) 20/llfMEMO1.PM3 OPERATION: Drlg / Wkvr UlC Operator Location: Sec /[ T Drl g contr Location (gert'l) IN COMPLIANCE6 yes no n/a A. DIVERTER 1. ( ) 2. ( ) ( ) 3.() () 4.() () 5.() () 6.() () 7.() () 8. (,a" ( ) 9. (,.)-" ( ) 10. (,4/ ( ) 11. ('-,.-~ ( ) 12. (:F() 13 ( () 14. (~,Y" ( ) ~5. (;~- ( ) 16. (,/~f~' ( ) 17. (L.y~ ( ) STATE OF ALASKA aLASKA OIL AND GAS CONSERVATION COMMISSION BOPE Walk-Thru Inspection Report line sz & length line conn& anchored (i~bifurcated & dwn wind 90° targeted turns (~/vlvs: auto & simultaneous (/~Y~annular pack-off (!~/'condition B. BOP STACK wellhead flg wkg press stack wkg press annular preventer pipe rams ( ) blind rams ( ) stack anchored ( ) chke/kill line sz ( ) ( ) 90° turns targeted (chke & kill ln) 46. (.',~' ( ) ( ) HCR vlvs (chke & kill) 47. (.'~() ( ) manual vlvs (chke & kill) 18. (c-)~'/ ( ) ( ) connections (flgd, whd, clmpd) 19. (~ ( ) ( ) drl spool 20. (v~~ ( ) 21. (~.-)'"' ( ) 22. ('~--() ( ) flow nipple ( ) flow monitor ( ) control lines fire protected C. CLOSING UNITS ( ) wkg press ( ) fluid level ( ) oprtg press ( ) press gauges ( ) sufficient vlvs ( ) regulator bypass ( ) 4-way vlvs (actuators) ( ) blind handle cover ( ) driller control panel ( ) remote control panel 23. (,/~'~' ( ) 24. (~-)' ( ) 25. (?-Y ( ) 26. (~J-~- ( ) 27. (~)~- ( ) 28. (',-) ( ) 29. (F);:~ ( ) 30. (~,,)"-: ( ) 31. ('-)~' ( ) 32. (F)~' ( ) IN COMPLIANCE:. yes n~o n/a 33. (L~~ ( ) ( ) firewall 34. (~ ( ) ( ) nitrogen power source (back-up) 35. (~ ( ) ( ) condition (leaks, hoses, etc) D. MUD SYSTEM 36. (~ ( ) ( ) pit level floats installed 37. (.~.~ ( ) ( ) flow rate sensors 38. (L-~)~/() ( ) mud gas separator 39. (~-')'~ ( ) ( ) degasser 40. (~-)"-~ ( ) ( ) separator bypass 41. (p)~¢~() ( ) gas sensor 42. (~v- ( ) ( ) chke In conn 43. (~/' ( ) ( ) trip tank E. RIG FLOOR ( ) kelly cocks (upper,lower,IBOP) ( ) floor vlvs (dart vlv, ball vlv) ( ) kelly & floor vlv wrenches ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) 48. (~ ( ) ( ) kill sheet up-to-date 49 (~ ( ) ( ) gas ~etection monitors (H S & methane) 50. (~ ( ) ( ) hydr chke panel 51. (//~- ( ) ( ) chke manifold F. MISC EQUIPMENT 52. (~)/ ( ) ( ) flare/vent line 53. (~'"' ( ) ( ) 90° turns targeted (dwn strm choke Ins) .. 54. (~ ( ) ( ) reserve pit tankage o~ 55. (b)/' ( ) ( ) personnel protective equip avail 56. (~ ( ) ( ) all drl site suprvs trained for procedures 57. (~/- ( ) ( ) H2S probes 58. (~-)/' ( ) ( ) rig housekeeping REMARKS: RECORDS: Date of last BOP inspection: Resulting non-compliance: Date of last BOP test: Non-comp]iances not corrected & why: /'-//A Date corrections will be completed: /'~ / X BOP test & results proper]y entered on daily record? Kill sheet current? Inspector . C.0013 (rev 04/29/91) l 7m LEGEND · EXISTING tlIELLS · CONDUCTOR AS-BUILT THIS SURVEY WELL A.S.P. PLANT j GEODETIC CELLAR NO. COORDS. COORDS.J POSITIONBOX LC)CAT]ON ELEV. IN SECTION 1 5,937,905.70 S 1669.87 J 70'13'59.816" 184.6' FS~ 71,.%945.58 E 1500.08j 148'16'21.698" 27.3 700' AS-BUILT AT NORTH SLOPE . ~EvIS~ONS VICINITY MAP N.T.S. NOTES 1. BASIS O¢' LOCATION IS THE RECORDED AS-BUILT POSITIONS OF EXISTING WELLS: (WELL ~'S: 9,2,3 AND 14). 2. COOt:~OINATE':; SHOWN ARE ALASKA STATE PLANE ZONE 4. 3. ELEVATIONS SHOWN ARE ARCO DATUM (M.L.L.W.). 4. REFERENCE FIELD BOOKS: ~ 91-18 (P.1.3 ,t, 14 ) DATE OF SURVEY: 6/12/91. SURVEYOR'S CERTIFICATE [ HEREBY CERTIFY THAT I AM PRO- PERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMEN- SIONS AND OTHER DETAILS ARE CORRECT AS OF JUNE 12, 1991. F. ROBERT BELL & ASSOC. ARCO Alaska Inc. ~RA ~/I1~ NAM[: DRILL SITE 3 CONDUCTOR AS-BUILT WELL # 35 16/~3,/9~ IPiTTENOER IH~TCHCOCK NTS ...... PA2030A~ F:'., ()~ B 0 X i ~.~ (') 3 6 ~) · . · o... ..~ ,.-.. j'*. ! · ;.~ ~'~. L, I-! 0 I~ ~.~ ..~ E AI...A,.?K A 995i DAI"E · 7-9-9i .I ,. # I - I REFERENCE' ARCO OPEN HOLE F.[NAI_S RUN t , t ' &2" RUN i, 2"&5" RUN t, 2"&'.S" RUN t, 2"&5" RLJN i, 2'&5" F(I. JN t, 5" "' .... ;' .... I" .., 0 F Y A,$ R E:. C, E:. I I::' T 0 F' D A 1' A t-I_E:.ASE!: SIGN AND I..E:.T.JRN THE ATTACHED r' " ' "' .... , HAVE A NICE DAY! SONYA WALLACE: ATO-i 529 Al'LAS A'FI_AS A TI...A,S' AI'I_AS ATL. A,S' ATI_A,S; DISTRIBUI'ION ,- CENTRAL I'-~ I LES ,,-~"CHEVRON :~ D & M · ,,.~" EXTENSION EXPLC)RATION · ~ EXXON ~: MARAI'HON · ~ MOBIL PHILLIPS F'B WEL. L Fl:LES R & D BPX STATE OF ALASKA TEXACO RECEIVED JUL 1 1 1991 Naska 011 & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION June 10, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Richard B Gremley Regional Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bay DS 3-35 ARCO Alaska, Inc. Permit No. 91-80 Sur. Loc. 1846'FSL, 700'FWL, Sec. 11, T10N, R15E, UM Btmhole Loc.1008'FNL, 1487'FEL, Sec. 14, T10N, R15E, UM Dear Mr. Gremley: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE test that it wishes to witness. Y~chairman Alaska O~t~ Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ,,~-'-' STATE OF ALASKA AL ~ OIL AND GAS CONSERVATION ,.,. IMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type ofwork Drill [] Redrill [] lb. Type ofwell. Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. 60' RKB feet 3. Address 6. Property Designation P.O. Box 100360 Anchorage, AK 99510 ADL 28332 / ALK 2328 Prudhoe Bay 4. Location of well at surface 7. Unit or property Name 11. Type Bond (soo 20 AAC 25.025) 1846' FSL, 700' FWL, Sec 11, T10N, R15E, UM Prudhoe Bay Statewide At top of productive interval 8. Well number Number 835' FNL, 1675' FF.,L, Sec 14, T10N, R15E, UM DS 3-35 U-630610 At total depth 9. Approximate spud date Amount 1008' FNL, 1487' FEL, Sec 14, T10N, R15E, UM 6/14/91 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 700' @ Surface feet DS3-3 36' @ 1000' feet 2560 10238' MD / 9227' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (soo 20 AAC 25.035 (d)(2)) Kickoff depth 500' feet Maximum hole angle27 42' o Maximum surfaco 2770 psig At total depth (TVD) 3650 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3 0" 20" 94.5 H-40 weld 80' 32' 32' 112' 112' 2000g Poleset 16" 13-3/8" 68 L-80 BTC 3735' 32' 32' 3767' 3500' 1425 sx CSIII & 400 sx 'G' 12-1/4" 9-5/8" 47 L-80 BTC 9645' 31' 31' 9676' 8732' 350 sx 'G' 8-1/2" 7" 29 CR-13 FOX 862' 9376' 8465' 10238' 9227' 150 sx 'G' Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented ~ ~ Measured depth True Vertical depth Structural~' ~CEIV~ Conductor Productionlntermediate Alaska Oil & Gas Cons. Commission Liner Anchorage Perforation depth: measured true vertical 20. Attachments Filing Fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements [] 21.1 hereby c~,,., rtif~/th~ th,e fore/~no' is true and correct to the best of my knowledge Signed /~~~,/~ .-~_---~.~J~~'~ Title ActingRegi°nalDrillingEn~iaq~er · "" ~' Commission Use Only Ffl','~ ~' Permit Number APl number I Approval dale cover letter for other requirements (~//"' rC/ I 50-o~'-- 2.~./"~'~// I 0~)/10/91 ol~N° ISee Conditions of approval Samples required [] Yes~ No Mud Icg r~equired [] Yes Hydrogen sulfide measures [] Yes ~ No Directional survey required ~r Yes [] Required workingpressureforBOPE,,,~,.~_~M; [] 3M; ~ SM; [] 10M; [] 15M Approv~ ~ Commissioner the commission Date ~Z,A/ Form 10-401 Rev. 12-1 Submit in triplicate PBU DS 3-35 OPERATIONS SUMMARY 1. MIRU drilling rig. NU diverter and function test same. 2. Drill vertical 16" hole to 500' TVD/MD. 3. Kick off and build angle at 2.5 degrees/100 ft. to 27 deg 42' in the S 47 19' E direction. End of build is to be at 1831' TVD / 1884' MD. Drill to 3500' TVD / 3767' MD maintaining the 27 deg 42' hole angle and the S 47 19'E direction. 4. Set 13-3/8" casing and cement same. Nipple up BOPE and test to 5000 psi. 5. Pickup 12-1/4" BHAand RIH. Test casingto 2000 psi for30 minutes. Drill 10' of new hole and perform leakoff test. 6. Drill 12-1/4" hole to 8732' TVD / 9676' MD maintaining the 27 deg 42' hole angle and the S 47 19' E direction. 7. Set 9-5/8" casing and cement same. 8. Pick up 8-1/2" BHA and GIH. Test casing to 3000 psi. 9. Drill 10' of new hole and perform EMW test. 10. Drill 8-1/2" hole to 9227' TVD / 10,238' MD maintaining the hole angle and direction. 11. Run wireline logs as programmed. 12. Set 7" liner and cement same. 13. Clean out the liner and test liner to 3000 psi for 30 minutes. Circulate well to brine. 14. N/D BOPE and N/U Dry hole tree. Test to 1000 psi. 15. R/D and M/O ddlling rig. 16. Wait 7 days prior to running cased hole logs. 17. MI and R/U completion rig. 18. Run 5-1/2" tubing and packer assembly with GLMs, and SSSV. Test tubing and casing to 3000 psi. Freeze protect with diesel. 19. N/U tree and test to 5000 psi. Release completion rig. 20. Rig up wireline unit and perforate. · Anticipated BHP: 3650 psi (8.5 ppg Erv~ @ 8800' TVD · Maximum Anticipated Surface Pressure: 2770 psi Planned Completion Fluid: 8.6 ppg Seawater RECEIV£ Alaska Oil & Gas Cons. Commission Anchorage NOTE: PBU DS 5-36 OPERATIONS SUMMARY CONT. a. Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 9-5/8" x 13-3/8" annulus. The annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sx of cement followed by Arctic Pack. b. Minimum distances of wells within 200 ft. of the proposed well are: DS 3-3 36 ft @ DS 3-2 59 ft @ DS 3-4 108 ft @ DS3-5 119 ft @ DS3-1 174 ft @ DS 3-26 186 ft @ 997' TVD / 1000' MD Surface 1385' TVD / 1400' MD 65,33' TVD / 7200'MD 500' TVD / MD 4941'TVD / 5400' MD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). e. Based on previous logs on DS 3, no potential productive zones are anticipated above 3500' TVD. f. No potential hazardous levels of H2S are antidpated in this well. Alasim Oil & 6as Cons. Commission Anchorage DS 3-35 MUD PROGRAM DEPTH DENSITY VIS YP INT 10MIN FL OIL SOLIDS (TVD) (PPG) GELS GELS CC/30MIN (%) (%) MUD TYPE SPUD 8.8 300 70 30+ 50+ 25 0 2 to to to to to 13-3/8" 9.2 100 40 6 csg pt. SET 13-3/8" CASING GEL-BENEX SPUD MUD DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (-I-VD) (PPG) (CP) (#/ft GEL GEL cc/30min (%) (%) TYPE 13-3/8" 8.7 10 6 2 4 25 0 2 LIGHTLY to to to to to to to to TREATED 9-5/8" 10.0 20 25 6 12 6 11 POLYMER csg pt. SET 9-5/8" CASING DEPTH DENSITY PV YP INT 10min FL OIL SOLIDS MUD (TVD) (PG) (CP) (#/ft) GEL GEL cc/30min (%) (%) TYPE 9-5/8" 8.7 10 6 2 1 8 0 4 LIGHTLY to to to to to to to to TREATED TD 9.1 15 10 4 10 6 6 POLYMER SET 7" LINER THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. JUN Alaska Oii& Gas Cons. Commission Anchorage 0 10(M) 2000 3000 40~0 ~ ~ ~vvv [ r [ i [ [ [ [ i [ { [ [ [ i [ [ [ RKR I:U['J~/A'I'JON 60' ' 20" Casing TVD=] 10 TMD=I~ 0 AR(' O ALA SKA, II IC. 2.O DS3-,35 6.0 I(X0 C~I'NAT ]~. Itt 1~ ~4.o SHL: U 1 )N 15E 11 1846' Fl L 700' FWL ~16.0 · ~a&o THL: U 1 )N 15E 14 835' FN 1675' FEL ~ o BHL: U 1 }N 15E 14 1008' E ~L 1487' FEL zo S 47 19' ]  ~°'° EOC TVD--1831 TMD=18~ DEF=327 TVD=3500 TMD=37~7 DEP=1202 YVD--4500 TMD=4897 DEP=1727 K-15 TVD=4933 TVID=-5386 DEP=1954 kVERAGE ANGLE = 2" 42' Ugnu TVD=-5)14 TMD=6494 DEP='; K-12 TVD=6938 TlVID=-'1650 DEP=3007 K-10 TVD=7449 TMD=8227 DEP=3275 dUbJ -. 6 Alaska Oil & ua.s Cons. Commission K-$ TV )=8171 T1V[D--90~3 D] I SHUBLIK TVD---8~31 TlVlD=)675 DEP=3948- · k 9-5/8" Casing ~-8732 TM~76 DEP=3948 lop ~aQl~rocmt TY~R, 3ET TVD=8742 T1~-9689 DEP=3955 \ HOT TVD---9058 TlVl])=10046 DEP--~121 O/W Co{,tact TVD=9095 TMD= 10087 DEP--~140 TD TVD=9227 T)[D=10238 DEP-=4211 ................................................................ 1000 2000 - 3000 4000 5000 6000 7000- 8000 9OOO 10000 0 1000 2000 3000 4000 5000 6000 VERTICAL SECTION 7000 ARCO ALASKA, INC. DS3-35 S47 19'E -2000 2000 03-01 1000 0 03 -02 1000 < ~-2000 -3000 -4000 -5000 -2000 E - W COORDINATES -lo00 0 1000 2000 3000 4000 5000 1 6612 '~l 39 116 41 ~~ 15 ~ 5~ .... ~6333 ~o~03-2~~*  515 ~ 03-~  352  8657 03_05 ............................................................... 2OOO 1000 0 -1000 · -2000 -3000 -4000 -1000 0 1000 2000 3000 4000 -50O0 5O00 13-5/8" 5000 psi BOP STACK DIAGRAM I IPE RAM L LIND RAMSic DRILLING ~ PIPE RAMS SPOOL BRADEN HEAD ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVIOR TO THE PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT THE ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH THE CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRES- SURE. 13-5/8" STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK THE RUNNING JOINT WITH PREDETERMINED PLUG SEATING DEPTH. RUN THE TEST PLUG ON DRILL PiPE AND SEAT IN WELL- HEAD. 3. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. 4. FUNCTION TEST CHOKES. 5. IN EACH TEST, FIRST HOLD 250 PSI FOR 3 MINUTES PRIOR TO THE HIGH PPRERSSURE TEST. 6. INCREASE PRESSURE ON ANNULAR TO 3000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF THE CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS. CLOSE BOq-I-OM PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 10. TEST REMAINING MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAM OF THE VALVE AND ZERO PRESSURE DOWNSTREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS. 12. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 3 MINUTES. 13. BLEED OFF ALL PRESSURE. OPEN BLIND RAMS. FILL MANIFOLD AND LINES WITH NON-FREEZING FLUID. SET ALL VALVES IN THE DRILLING POSITION. 14. TEST STANDPIPE VALVES TO 5000 PSI. 15. CHECK DEGASSER OPERATION. 16. RECORD BOP TEST INFORMATION ON THE BOP TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 17. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST DAILY. POOL 6 DIVERTER SYSTEM ARCO ALASKA, INC. RLL~JP LINE RLSER FLOWMNE 20" :21XD PSI DIVERTER I I co.ou~o. I NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT MNE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS THIS IS A VARIANCE FROM 20AAC25.035. , ....................... · · · · · ., · ,, ,, ,, RIG LAYOUT · · · · i ~ ................ DIVERTER UNES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEE~ POOL ARCTIC ALASKA RiG #6 MUD SYSTEM 2 BRANDT SH~T.~. SHAKERS 2 BRANDT SH~T.m CT.~.~NERS DEGASSER SAND TRAP 30 BBL DESANDER PIT 198 BBLS MUD CT.~.ANER PIT 153 BBLS CENTRIFUGE PIT 226 BBLS VOLUME PIT 150 BBLS SUCTION PIT 137 BBLS PILL PITS 140 BBLS TRIP TANK 90 BBLS MUD / ~ATER STORAGE PIT 223 BBLS INJECTION TANK 154 BBLS ITEM C1) Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE DATE [2 thru ~] ' -' 3. 4. (3) Admi n (4) Casg 5~ /A'/.~.:'~°,', g-'7-¢/ 8, [8] 9. [9 thru 13] 10. ~. ~'~.~,~!/, ~ - ~ -,,q/ 11. [10 & 13] 12. 13. 7-,, [14 thru 22] 15. (5) BOPE ~/.,'~!'..;<~; ~- 7 - ? i [23 thru 28] (6) Other (6) Addl 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. [29 thru' 3'1] ' 30. 31. Company Is permit fee attached ............................................... Is well to be located in a defined pool ................. · ............. Is well located proper distance from property line ................... Is well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool Is well to be deviated & is wellbore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease ntrnber appropriate .......................................... Does well have a unique name & nkrnber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface 8 intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to~o~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. Lease & Well NO REMARKS ./ geology' engineering' DWJ MTM/Z¢ LCS RPC~ BEW RAD JH&~,,.~ ~ rev 03/29/91 '~/6.011 INITIAL GEOI UNIT ON/OFF POOL CLASS STATUSAREA SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi .. No special'effort has been made to chronologically organize this category of information, Copyright 1987~1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. Ail rights reserved. Tape Subfile 1 is type: LIS **** REEL HEADER **** 91/ 7/25 **** TAPE HEADER **** Tape Subfile: 1 Minimum record length: Maximum record length: Tape Subfiie 2 is type: LIS TAPE HEADER PRUDHOE BAY I/NIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 2 records... 132 bytes 132 bytes RUN1 89779 BRAD ESARY Z. JOHNSON REMARKS: 335 500292218400 ARCO ALASKA INC. ATLAS WIRELINE SERVICES 24-JUL-91 RUN2 RUN3 60.00 59.00 28.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 0.000 9.625 9651.0 8.500 DT AND NPHI ON DEPTH. NO DEPTH SHIFT REQUIRED FOR THESE CURVES. $ **** FILE HEADER **** FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE SDN 2435 DIL BCS $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA START DEPTH STOP DEPTH 9655.0 10206.0 9655.0 10210.0 9655.0 10206.0 9655.0 10186.0 BASELINE DEPTH 9655.0 9670.0 9673.0 9674.5 9675.0 9688.0 9700.0 9730.0 9756.0 9798.0 9800.0 9805.0 9840.0 9847.0 9848.5 9850.0 9896.0 9907.5 9908.5 9910.0 9911.0 9914.5 9917.0 9938.5 9939.0 9989.5 9991.0 9994.5 9995.0 10000.0 10016.0 10021.0 10032.0 10036.0 10040.0 10050.0 10100.0 10110.0 10110.0 10110.0 $ BASELINE DEPTH 9673.0 9674.5 9675.0 9688.0 9700.0 9730.0 GR FROM BCS (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH GR RHOB PEF DRHO 9655.0 9672.0 9672.0 9672.0 9800.0 9800.0 9800.0 10000.0 10017.0 10031.0 10035.0 10040.0 10052.0 10052.0 10052.0 1010.0. 10110.0 10110.0 10110.0 10110.0 10110.0 10110.0 10110.0 10110.0 10110.0 ILM ILD 9672.5 9672.5 9674.0 9674.0 9675.0 9675.0 9690.0 9690.0 9700.0 9700.0 9730.0 9730.0 LL8 9672.5 9674.0 9675.0 9690.0 9700.0 9730.0 9756.0 9800.0 9806.0 9840.0 9848.0 9849.5 9850.0 9896.0 9906.5 9907.0 9908.5 9909.0 9914.5 9917.0 9937.0 9937.5 9989.0 9990.5 9993.5 9994.0 10021.0 9756.0 9800.0 9805.0 9840.0 9847.0 9848.5 9850.0 9896.0 9907.5 9908.5 9910.0 9911.0 9914.5 9917.0 9938.5 9939.0 9989.5 9991.0 9994.5 9995.0 10021.0 10145.5 10146.5 10147.0 $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: CN WN FN COUN STAT 9756.0 9800.0 9806.0 9840.0 9848.0 9849.5 9850.0 9896.0 9906.5 9907.0 9908.5 9909.0 9914.5 9917.0 9937.0 9937.5 9989.0 9990.5 9993.5 9994.0 10021.0 10146.0 10147.0 10147.5 RUN NO. 9756.0 9800.0 9806.0 9840.0 9848.0 9849.5 9850.0 9896.0 9906.5 9907.0 9908.5 9909.0 9914.5 9917.0 9937.0 9937.5 9989.0 9990.5 9993.5 9994.0 10021.0 10146.0 10147.0 10147.5 PASS NO. : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA MERGE TOP MERGE BASE * FORMAT RECORD Tape depth ID: F 21 Curves: Name 1 DT 2 GR 3 ILD 4 ILM 5 LL8 6 SP 7 TEND 8 TENS 9 CALl 10 DEV 11 DRHO 12 FUCT 13 GRG 14 MTEM 15 NPHI 16 NUCT 17 PEF (TYPE# 64 ) Code Samples Units 68 1 US/F 68 1 GAPI 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 MV 68 1 LBF 68 1 LBF 68 1 IN 68 1 DEG 68 1 G/C3 68 1 CPS 68 1 GAPI 68 1 DEGF 68 1 PU-S 68 1 CPS 68 1 BN/E Size 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 18 RB1 68 1 DEG 4 19 RHOB 68 1 G/C3 4 20 TENL 68 1 LBF 4 21 TENL 68 1 LBF 4 Tape File Start Depth = 10250.000000 Tape File End Depth = 9655.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet 84 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26203 datums Tape Subfile: 2 254 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** .002 FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2435 9182.0 9655.0 GRCH 9176.0 9655°0 $ BASELINE CURVE FOR SHIFTS: GR FROM BCS CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: CN WN FN COUN STAT NO DEPTH SHIFT REQUIRED $ : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) Tape depth ID: F 8 Curves: Name Code Samples Units 1 DEV 68 1 DEG 4 2 FUCT 68 1 CPS 4 3 GRCH 68 1 GAPI 4 4 NPHI 68 1 PU-S 4 5 NUCT 68 1 CPS 4 6 RB1 68 1 DEG 4 7 TEND 68 1 LBF 4 8 TENS 68 1 LBF 4 Size Length 4 4 4 4 4 4 4 4 Tape File Start Depth = 9655.000000 Tape File End Depth = 9160.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8920 datums Tape Subfile: 3 62 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 32 0 '0 000 '0 0 'IA 0I~ 'I 0 'I9I 0[6 '0 0'I£ 010'E 0 'I9I ~'8 0'I~ 00'0I %%IM~ MMN'd'~'% 0'§§96 0'I§96 OOg'8 :(NI)MZIS iIS M%OM NMdO ~O DNIS~D ON~ £0SI [09I 60£I 90§£ 908E ~£6£ NOIJ, DflGNI DO~IJ, SflODIf NOISN~J, NDd J~HD O'O0§I 0'£8IOI 0'§§96 0'6IEOI 0'IIg0I I6-~£-9 00gE O'U:H~A E00D:A~ 9gESXSi I6-%~£-§ 0'80g0I 0 '9LIOI H,l,E~O EOJ~S : (MHaa) a~aS DNIDDO% : (,T,g) qlfAM.q,l, NI 90% :(aa) ~AMZLNI OO% dOg : (~) ~DDO~ :NOAAOS NO ~EODO% :G~ON~ NOI&~D~ID ~NI~ : NOIS~IA ~MA~Os : GtDDO~ ~&~O ~O~H 907 0 '~96 0 ' ~96 SDS H&~IG &~&S IGOD ~00~ ~OGNIA X~S l~I~ 00 ~ E ' 0 : &N~DNI : ~8~N SSV~ I : M~N ~ · unz zed SBUTa~S IOO~ sswd uTwm aaq~o ~og SelTg Kq pa~olIOg (IWAaa~UI $IqoOaalPWS aq$ SgTqs qsdep o~ pesn BuTa~s !s~IT~ a$~a~das uT BuTass IOO~ puw una qo~s aog ~p aap~q 6oi pu~ saAzno SS~ NIt54 f%OH N~dO M¥~ ~00' SI% :~dJ$ sy ~ ~I!~qns MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA 1.730 0.000 0.00 0.000 0.0 71.0 0.0 FORMAT RECORD (TYPE~ 64) Tape depth ID: F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 17 Curves: Name Size Length AC 68 i US/F 4 4 ACQ 68 1 DIM 4 4 CAL 68 1 IN 4 4 CHT 68 1 LBF 4 4 CILD 68 1 MMHO 4 4 GR 68 1 GAPI 4 4 RFOC 68 1 OHMM 4 4 RILD 68 1 OHMM 4 4 RILM 68 1 OHMM 4 4 SF 68 1 MV 4 4 SPD 68 1 F/MN 4 4 TlR1 68 1 US 4 4 TlR2 68 1 US 4 4 T2R1 68 1 US 4 4 T2R2 68 1 US 4 4 TEMP 68 1 DEGF 4 4 TTEN 68 1 LBF 4 4 Code Samples Units Tape File Start Depth = 10250.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS repreSentation code decoding summary: Rep Code: 68 73742 datums Tape Subfile: 4 263 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 68 Tape Subfile 5 is type: LIS **** FILE HEADER **** .004 FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 2 PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH 2435 9655.0 ZDEN 9655.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 10206.0 10206.0 5-JUL-91 FSYS256 REV:G002 VER:2.0 2200 4-JUL-91 830 5-JUL-91 10211.0 10219.0 9655.0 10187.0 1500.~ TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT GR CN PCM ZDEN PCM $ CABLEHEAD TENSION GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY PULSE CODE MODULATOR TOOL NUMBER 3974 1309 2435 3506 2222 3506 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 8.500 9651.0 9655.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: L.T.P.NEW DRILL 10.00 41.0 8.5 5.5 161.0 2.010 71.0 0.930 161.0 1.410 71.0 0.000 0.0 1.730 71.0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 2.65 0.000 0.0 * FORMAT RECORD (TYPE# 64) Tape depth ID: F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 20 Curves: Name Size Length CAL 68 1 IN 4 4 CHT 68 1 LBF 4 4 CN 68 1 % 4 4 CNC 68 1 % 4 4 DEV 68 1 DEG 4 4 GR 68 1 GAPI 4 4 HRD1 68 1 CPS 4 4 HRD2 68 ! CPS 4 4 LSN 68 1 CPS 4 4 PE 68 1 BARN 4 4 PORZ 68 1 % 4 4 RB 68 1 DEG 4 4 SFT2 68 1 DIM 4 4 SHR 68 1 DIM 4 4 SPD 68 1 F/MN 4 4 SSD 68 1 CPS 4 4 SSN 68 1 CPS 4 4 TTEN 68 1 LBF 4 4 ZCOR 68 1 G/C3 4 4 ZDEN 68 1 G/C3 4 4 Code Samples Units Tape File Start Depth = 10240.000000 Tape File End Depth = 9610.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61862 datums Tape Subfile: 5 284 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes 80 Tape Subfile 6 is type: LIS **** FILE HEADER **** .005 FILE HEADER FILE NUMBER: 5 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS 9655.0 DIL 9655.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 10176.0 10208.0 5-JUL-91 FSYS256 REV:G002 VER:2.0 2200 4-JUL-91 355 5-JUL-91 10211.0 10219.0 9655.0 10187.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT TEMP PCM GR AC DIFL $ CABLEHEAD TENSION TEMPERATURE · PULSE CODE MODULATOR GAMMA RAY ACOUSTILOG DUAL INDUCTION TOOL NUMBER 3974 2806 3506 1309 1603 1503 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH/~M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 8.500 9651.0 9655.0 L.T.P.NEW DRILL 10.00 41.0 8.5 5.5 161.0 2.010 71.0 0.930 161.0 1.410 71.0 0.000 0.0 1.730 71.0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL)' MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT ARCO ALASKA INC. 335 PRUDHOE BAY N. SLOPE ALASKA 0.00 0.000 0.0 * FORMAT RECORD (TYPE# 64) Tape depth ID: F 17 Curves: Name Size Length 1 AC 68 1 US/F 4 4 2 ACQ 68 ! DIM 4 4 3 CAL 68 1 IN 4 4 4 CHT 68 1 LBF 4 4 5 CILD 68 1 MMHO 4 4 6 GR 68 1 GAPI 4 4 7 RFOC 68 1 OHMM 4 4 8 RILD 68 1 OHMM 4 4 9 RILM 68 1 OHMM 4 4 10 SP 68 1 MV 4 4 11 SPD 68 1 F/MA' 4 4 12 TlR1 68 1 US 4 4 13 TlR2 68 1 US 4 4 14 T2R1 68 1 US 4 4 15 T2R2 68 1 US 4 4 16 TEMP 68 1 DEGF 4 4 17 TTEN 68 1 LBF 4 4 Code Samples Units Tape File Start Depth = 10250.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS repreSentation code decoding summary: Rep Code: 68 121281 datums Tape Subfile: 6 261 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 68 Tape Subfile 7 is type: LIS **** FILE HEADER **** .006 FILE HEADER FILE NUMBER: 6 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 2 PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH 2435 9655.0 ZDEN 9655.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SP~ED (FPHR): STOP DEPTH 10206.0 10206.0 5-JUL-91 FSYS256 REV:G002 VER:2.0 2200 4-JUL-91 756 5-JUL-91 10211.0 10219.0 9655.0 10187.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT GR CN PCM ZDEN PCM $ CABLEHEAD TENSION GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY PULSE CODE MODULATOR TOOL NUMBER 3974 1309 2435 3506 2222 3506 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 8.500 9651.0 9655.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD. VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: L.T.P.NEW DRILL 10.00 41.0 8.5 5.5 161.0 2.010 71.0 0.930 161.0 1.410 71.0 0.000 0.0 1.730 71.0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA THERMAL SANDSTONE 2.65 0.000 0.0 * FORMAT RECORD (TYPE~ 64) Tape depth ID: F 20 Curves: Name Code Samples Units Size Length 1 CAL 68 1 IN 4 2 CHT 68 1 LBF 4 3 CN 68 1 % 4 4 CNC 68 1 % 4 5 DEV 68 1 DEG 4 6 GR 68 1 GAPI 4 7 HRD1 68 1_ CPS 4 8 HRD2 68 1 CPS 4 9 LSN 68 1 CPS 4 10 PE 68 1 BARN 4 11 PORZ 68 1 % 4 12 RB 68 1 DEG 4 13 SFT2 68 1 DIM 4 14 SHR 68 1 DIM 4 15 SPD 68 1 F/MN 4 16 SSD 68 1 CPS 4 17 SSN 68 1 CPS 4 18 TTEN 68 1 LBF 4 19 ZCOR 68 1 G/C3 4 20 ZDEN 68 1 G/C3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 80 Tape File Start Depth = 10240.000000 Tape File End Depth = 9610.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 114804 datums Tape Subfile: 7 284 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS **** FILE HEADER **** .007 FILE HEADER FILE NUMBER: 7 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH 2435 9182.0 GRCH 9176.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 9655.0 9655.0 5-JUL-91 FSYS256 REV:G002 VER:2.0 2200 4-JUL-91 756 5-JUL-91 10211.0 10219.0 9655.0 10187.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT GR CN PCM ZDEN PCM $ CABLEHEAD TENSION GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY PULSE CODE MODULATOR TOOL NUMBER 3974 1309. 2435 3506 2222 3506 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 8.500 9651.0 9655.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: L.T.P.NEW DRILL 10.00 41.0 8.5 5.5 161.0 2.010 71.0 0.930 161.0 1.410 71.0 0.000 0.0 1.730 71.0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : ARCO ALASKA INC. : 335 : PRUDHOE BAY : N. SLOPE : ALASKA SANDSTONE 2.65 0.000 0.0 * FORMAT RECORD (TYPE# 64) Tape depth ID: F 10 Curves: Name Code Samples Units Size Length 1 CHT 68 1 LBF 4 2 CN 68 1 % 4 3 CNC 68 1 % 4 4 DEV 68 1 DEG 4 5 GR 68 ! GAPI 4 6 LSN 68 1 CPS 4 7 RB 68 1 DEG 4 8 SPD 68 1 F/MN 4 9 SSN 68 1 CPS 4 10 TTEN 68 1 LBF 4 4 4 4 4 4 4 4 4 4 4 Tape File Start Depth = 9655.000000 Tape File End Depth = 9160.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 143073 datums Tape Subfile: 8 156 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes 40 Tape Subfile 9 is type: LIS **** TAPE TRAILER **** 91/ 7/25 **** REEL TRAILER **** 91/-7/25 Tape Subfile: 9 Minimum record length: Maximum record length: End of execution: Thu 25 JLY 91 9:35a Elapsed execution time = 1 minute , 8.2 seconds. SYSTEM RETURN CODE = 0 2 records... 132 bytes 132 bytes