Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-035 � � X91 03 5 G2,1 WELL LOG TRANSMITTAL#903417626 To: Alaska Oil and Gas Conservation Comm. i rt August 15, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 OCT 04 2016 LGG Anchorage, Alaska 99501 D`oas)ols AOGG M.K. BENDER RE: Multi Finger Caliper : 1L-18 Run Date: 7/11/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-18 Digital Data(LAS), Digital Log file, Casing Inspection Report, 3D Viewer 1 CD Rom 50-029-22145-01 Multi Finger Caliper (Field Log) 1 color log 50-029-22145-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 ME) NOV 0 3 2016 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil❑ Gas❑ SPLUG❑ Other ❑ Abandoned E I Suspended ❑ 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development ❑ Exploratory ❑ GINJ ❑ WINJ❑ WAGE' WDSPL❑ No.of Completions: Service 2 Stratigraphic Test ❑ 2.Operator Name: 6. Date Comp.,Susp.,or -024 ,14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.: 7/1)/201e 191-035/316-216/' 3.Address: 7. Date Spudded: 15.API Number: P.O. Box 100360 Anchorage,AK 99510-0360 3/14/1991 50-029-22145-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 507'FNL, 143'FEL,Sec 31,T11N, R10E,UM 3/21/1991 KRU 1L-18 Top of Productive Interval: 9. Ref Elevations: KB:130 17. Field/Pool(s): 1410'FSL, 1091'FWL,Sec 32,T11N, R10E. UM GL:87 BF:88 Kuparuk River Field/Kuparuk River Oil Pool • Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 1077'FSL, 1270'FWL,Sec 32,T11N,R10E, UM 7700/6285 ADL 25659 4b.Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 539924 y- 5948461 Zone- 4 7800/6358 ALK 2585 TPI: x- 541188 y- 5945105 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 541370 y- 5944773 -Zone- 4 1799/1781 1473/1470 5. Directional or Inclination Survey: Yes ❑ (attached) No 0 13.Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) I N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary N/A RECEIVED AUG 232016 23. CASING,LINER AND CEMENTING RECORD AOGCC WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT. PULLED 16 62.5 H-40 43 122 43 122 24 235 sx ASI 9 5/8 36 J-55 42 4120 42 3567 12 1/4 800 sx PF Type E,500 sx Premium 7 26 J-55 35 7789 35 6351 8 1/2 250 sx Class G 24.Open to production or in 0 25.TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 3 1/2 7168 7116/5859 Perforations Plugged Off WNW*1.1619 -4f, 26.ACID, FRACTURE,CEMENT SQUEEZE, ETC. DATE Was hydraulic fracturing used during completion? Yes❑ No 0 rs,.. scow FEB 2 4 f U I 7/2 /)1p Per 20 AAC 25.283(i)(2)attach electronic and printed information ,/F_RIFIFI) DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED L L- 7123-7632 Pumped 85 bbls of 16.5 ppg cement 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): n/a Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period -+ Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(torr): Press. 24-Hour R to - Vf Io/I / i'Kt ,nw/s- Form 10-407 Revised 11/2015 /_/�ONTINUED ON PAGE 2 RBDMS �c--AUG 2 5 20i8bmit ORIGINIAL only CUl/b � • i 28.CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored(MD/TVD,From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well tested? Yes ❑ No ❑ Permafrost-Top Surface Surface If yes,list intervals and formations tested,briefly summarizing test results. Permafrost-Base 1473 1470 Attach separate pages to this form, if needed,and submit detailed test Top of Productive Interval n/a n/a information, including reports,per 20 AAC 25.071. Formation at total depth: n/a 31. List of Attachments: Daily Operations Summary,Schematics Information to be attached includes, but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report.production or well test results.per 20 MC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jeff Connelly ft 263-41 2 Email: Jeff.S.Connelly(a)_conocophillips.com Printed Name: G. Eller \ Title: CTD Engineering Supervisor , Signature: Phone: 263-4172 Date: v 1� J\ INSTRUCTIONS General: This form and the req rp (^�ed attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost.Provide MD and ND for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results,including,but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • 1 L-18 DTTMS JOBTYP SUMMARYOPS 5/8/16 DRILLING Lay in 35 bbls of 16.5 ppg Cement(20 bbls with CemNet Fiber)from 7,632' SUPPORT- RKB up to 5,112' RKB. Achieved squeeze pressure and held for 30 minutes. CAPITAL Contaminate cement down to 7,114' RKB (TOC target depth 7,124' RKB). Chase returns to surface at 70% slowing down and washing all jewelry. Well freeze protected and ready for Slickline to tag and pressure test in 72 hours. 1,400 psi left on well. ***Job in Progress*** **Two day total cement behind pipe: 28 bbls +/-** 5/11/16 DRILLING TAGGED CEMENT @ ESTIMATED DEPTH OF 7124' RKB. RAN LIB TO SUPPORT- GLM @ 7045 'RKB FOR DEPTH CORRELATION. MITT 2000 PSI CAPITAL (PASSED). READY FOR DHD. 5/14/16 DRILLING (PRE-CTD): TREE VALVE TEST- MV, SSV, SV NEG (PASSED), MV, SSV, SUPPORT- SV POSITIVE (PASSED). Reported 07/12/2016. CAPITAL 7/8/16 DRILLING Rig move 1L-24A to 1L-18, prep well for rig, spot modules over well, preform SIDETRACK post rig move check list, nipple up to well 18, fluid pack surface lines for BOP test, Begin Initial BOP test. 7/9/16 DRILLING Finish BOP testing. Test PDL and TT line. Pull BPV. Bled tubing to 0 psi, SIDETRACK flow check. Micro Motion calibration per Dave Smith procedure. MU BHA#1, 0.9 AKO motor and 2.80" D331 slick gauge mill. Plus 11.5 ft correction at HRZ. Dry tag at 7,116 ft, Mill 20° ROHS from top of cement at 7,123 ft to 7,170 ft. Contact casing at 7,168.44 ft. 7/10/16 DRILLING Mill pilot hole 20° ROHS from 7,170 ft to 7,415 ft. Dressed transition area 7/10/16 DRILLING ORIGINAL 7/11/16 DRILLING LD BHA#1. Jet stack. MU/RIH with BHA#2 Halliburton 24 short arm SIDETRACK Caliper. Caliper pilot hole from 7,400 ft to 7,100 ft, 2 passes. POOH. Flow check. LD BHA#2, MU/RIH with BHA#3 Baker Whipstock. Set TOWS TF 0° HS at 7,385 ft. POOH. Flow check. MU/RIH with BHA#4 window milling assembly. Roll hole to 8.6 ppg FloPro milling fluid. Dry tag TOWS at 7,386 ft. Begin milling window at 7,385.2 ft to 7,387 ft. 7/12/16 DRILLING Milling window exit from 7,387 ft to 7,390.3 ft, drilled rat hole down to 7,406 SIDETRACK ft, dressed window with 3 passes, POOH following mangage pressure schedule, PUD milling BHA, PU/MU/PD build section BHA#5, RIH pumping min rate thru open EDC, tied into the HRZ correction of plus 13.0 ft. Drilled ahead from 7,406 ft to 7,423 ft 7/13/16 DRILLING Drill ahead from 7,423 ft to 7,590 ft, POOH, following manage pressure SIDETRACK schedule, PUD build section BHA, PU/MU/PD lateral section BHA#6 w/ RSM, tie into the HRZ correction of plus 12.0 ft, set down at bottom of window at 7,390 ft, PUH roll pump, try again, bobble seen then bopped thru, continued to bottom and drilled 7,590 ft to 8,158 ft. 7/14/16 DRILLING Drilled ahead from 8,158 ft to 8,200 ft, performed choke calibration at 7,400 SIDETRACK ft, POOH following manage pressure schedule, PUD lateral section BHA#6, PU/MU/PD BHA#7 w/0.8° bend motor and RR bi-center bit, RIH, tie into the HRZ correction of plus 11.5 ft, drill ahead from 8,200 ft to 8,796 ft. 7/15/16 DRILLING Drilled ahead from 8,796 ft to 9,313 ft, performing wipers every 400 ft drilled, 7/16/16 DRILLING POOH for OH Anchored billet, pumped a 5x5 sweep and chased up hole 1110 7/17/16 DRILLING Drilled ahead from 8,761 ft to 9,184 ft. 'Drilled ahead from 8,520 ft to our SIDETRACK wiper at 8719 ft, wiper was clean up to the bottom of billet, RBIH, drilled ahead to 8840 ft, pulled a wiper up to 7840 ft thru the high gamma area, hole is in rough condition, RBIH, stacked out at 8,585 ft 8,560 ft and 8,825 ft. passed thru lowering pump rate to 0.75 bpm, drilled ahead to 8,990 ft, 'Cont drilling ahead for data to 9184' cross cut A5 &A6 into B1. POOH to PU OH anchored billet. Numerous trips cleaning up build section 7440' to 7600'. 7/18/16 DRILLING 'Continue cleaning hole 7400' to 7600'. stalling motor 7520', 7519', 7516, SIDETRACK 7512', and 7507'. pumping a 5x5 sweep from 7520' and a 10x10 from 7600' chased sweep out of hole, tied into the RA correction of plus 4.0', continued POOH, PUD/LD drilling BHA. PD Open Hole Anchored Billet, RIH, 'RIH with Open Hole Anchored Billet, no issues through build section. TOB set @ 8410'. POOH. PUD BHA#10. PD BHA#11 kickoff drilling assy. RIH. Tie-in to HRZ+33.5' correction. Cont RIH. Dry tag TOB @ 8410.7' as planned. Kicking off billet @ 160°ROHS, drilled ahead to 8,767 ft. 7/18/16 DRILLING ORIGINAL 7/19/16 DRILLING Continue drilling A lateral from 8767 ft to 9590 ft. Short wipers as required. SIDETRACK Performed mud swap with new mud at the bit at 9178 ft. Started out of the hole for planned BHA swap. Had to work BHA through tight hole in the build section. Continue out of the hole. Bump up at surface and space out. PUD BHA#11. 7/20/16 DRILLING Finish PUD and LD BHA#11. MU, PD, and RIH with BHA#12 (Agitator, 0.4° SIDETRACK AKO motor, and RB HYC bit). Shallow test agitator BHA, continue in the hole. Tie in to the HRZ for a +11 ft correction. Drill ahead from 9593 ft to 10139 ft. Weight transfer issues. Stacking weight. Pull wiper to the tubing tail to clean build section. No increase in cuttings over the shakers at BU. RBIH, stack weight at the window. Roll TF 10° ROHS, clean pass through window. 00:00 -04:15 7/21/16 DRILLING RIH, tie in to the RA for a +5.5 ft correction. Continue into open hole, stack SIDETRACK weight in several places. Drill from 10,139 ft. to 10,740 ft. Short wipers at 10340 ft, and 10,540 ft. Tie in wiper at 10740 ft. Drill to midnight depth of 10790 ft. No improvement of weight transfer with beaded pills. 00:00 -03:30 Continue drilling ahead to 10,861 ft. Stacking weight. 03:30- 04:30 7/22/16 DRILLING Drill from 10790 ft to TD at 10950 ft. Pump 10 x 10 sweeps and chase to the SIDETRACK swabs. RBIH, tie in to the HRZ for a +11.5 correction. Continue in the hole to corrected TD of 10,955 ft. POOH laying in liner running pill followed by completion fluid. Paint EOP flags at 8700 ft and 5100 ft. Flow check at surface. Static. LD BHA#12, bit grade 1-1-TD. Prep to run liner. 00:00 - 03:00 • S 7/23/16 DRILLING RIH with first segment of liner, NP bull nose, 54 joints slottled liner and SIDETRACK shorty deployment sleeve. Work liner down though poor hole conditions to set depth of 10,955 ft. Release from liner and POOH. Relog HRZ to confirm liner top depth of 8813 ft. Flow check at surface. Static. PU second segment of liner, bull nose, 23 joints slotted liner, shorty deployment sleeve, RIH at set on depth. Release from liner, POOH, flow check at surface, static. PU thirst segment of liner, bull nose, 1 joint slotted liner, and an open hole anchored billet. RIH and set on depth. Top of billet at 7850 ft. POOH, LD running tools over a dead well. Clean and clear rig floor. Start bi-weekly BOP test. Witness waived by Chuck Scheve. 00:00 - 05:00 Testing BOPE per procedure 7/24/16 DRILLING Finish BOPE test. No failures. Rig maintenance. Trim coil and rehead. MU SIDETRACK BHA#16, 0.7°AKO motor and RB HCC bit. RIH, tie in to the HRZ for a +9 ft correction. Dry tag billet. Time drill off of billet, dry drift clean. Drill ahead to midnight depth of 8036 ft. 00:00 - 03:15 7/25/16 DRILLING Continue drilling ahead from 8036 ft to midnight depth of 9325 ft. Wiper trips SIDETRACK at 8240 ft, 8540 ft, 8840 ft, and 9140 ft. Possible geomagnetic interference on some surveys that required retaking 3 surveys on 30 ft stations. 00:00- 02:00 Drill to wiper trip depth of 9440 ft. 02:00 -04:00 PUH inside TT. Tight hole at 8240 ft and 7505 ft. 04:00 -05:00 Perform mud friction factor measurement, RBIH. 7/26/16 DRILLING Continue drilling ahead from 9,325 ft to called early TD of 9,505 ft due to SIDETRACK faulting into A6 zone at-9,350 ft. Pump sweeps with jog at 7,750 ft. Wiper to swab. RBIH. Lay in beaded liner running pill/completion fluid to surface from 9,340 ft. LD BHA#16. Prep floors and MU AL1 liner assembly, bullnose, 68 jts slotted, shorty deployment sleeve. RIH with AL1 linner assembly on BHA#17. Plus 5 ft correction at flag. Worked liner down from 8,730 ft to 9,335 ft as of midnight. 7/27/16 DRILLING Realease off AL1 liner assembly at 9,335 ft. PUH and log HRZ for a 5.5 ft SIDETRACK correction. Corrected top of AL1 liner assembly 7,160 ft, bottom at 9,340 ft. Displace hole to seawater. Freeze protect from 2,500 ft. PUD BHA#17. Set BPV. Rig down checklist. 7/31/16 DRILLING RAN MAGNET TO TOP OF LINER @ 7160' RKB; MEASURED BHP @ SUPPORT- 7100' RKB (3221 PSI); SET BAITED HOLEFINDER @ 7090' SLM; MADE CAPITAL SEVERAL ATTEMPTS TO PULL DV @ 1939' RKB. IN PROGRESS. 8/1/16 DRILLING ATTEMPT TO PULL DV @ 1939 (FISH NECK IS STRIPPED); PERFORM SUPPORT- DDT ON IA& PULLED BAITED HOLEFINDER @ 7090' SLM. JOB CAPITAL COMPLETE. 8/8/16 PUMPING HOT DSL TBG FLUSH 8/9/16 PUMPING FREEZE PROTECT TUBING WITH 22 BBLS DIESEL 8/12/16 ANN (PRE-SW) : MIT-IA(PASSED) TO 2500 PSI. • 1 L-18A CTD Schematics 3-1/2"Camco TRDP-4A SSSV @ 1799'MD(2.812'min ID) 16"62#H-40 shoe @ 122'MD 3-1/2"9.3#J-55 EUE 8rd Tubing to surface 9-5/8"36#J-55 shoe @ 4121'MD 3-1/2"McMurry gas lift mandrel @ 1939' 3-1/2"Macco gas lift mandrel @ 7046' Baker 3-1/2"PBR @ 7102'MD(3.0"ID) Baker HB packer @ 7116'MD(3.5"ID) 3-1/2"Camco D landing nipple @ 7133"MD(Milled to 2.80") • - Baker SOS @ 7167'MD 3-1/2"tubing tail @ 7162'PDC AIINNAirit C-sand perfs 7244'-7298'MD 1L-18AL1 wp04(South) KOP7386'MD TD @ 9,504'MD @ Lined from 7160'-9340'MD 1L-1 8A wp06(N)/V) _______ TD @ 10,955'MD • _ __ _ Anchor Billet @ 7845'MD A-sand perfs 7442'-7464'MD ss 7540'-7550'MD r D@91 A = - AB113'MD Anchor Billet @ 8441'MD 1 L-18APB2 TD @9184'MD Anchor Billet @ 8410'MD • 7"26#J-55 shoe @ 7789'MD KUP I 1 L-18 ConocoPhillps - Well Attribute Max Angle t TD • Alaska.,inti. 1^`. Wellbore API/UWI Field Name Wellbore Status ncl Cl MD(ftKB) Act ebb(ftKB) Cato,,,,, ips'�r 500292214500 KUPARUK RIVER UNIT INJ 44.79 3,200.00 7,800.0 ... ° Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) -Rig Release Date 1L-18.8'16/20168:4144 AM SSSV:TRDP Last WO: 42.99 3/24/1991 Vertical schemahc(actual.. Annotation Depth(RKB) End Date Annotation Last Mod By End Date Last Tag:SLM 7,124.0 5/11/2016 Rev Reason:ADD LATERALS lehallf 8/1/2016 Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wi/Len(1 Grade Top Thread RANGER,378 i D p (in) (in)1 (ftKB) Depth1 ) 1 H-40 WELDED ° 'fir Casing Description ODDepthR Set ND... Len I... Top CONDUCTOR 16 15.062 43 0 122.0 122.0 62.50 Grade Top Thread SURFACE 9 5/8 8.921 42.0 4,120.6 3,566.5 36.00 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len(I...Grade Top Thread PRODUCTION 7 6.276 35.4 7,788.6 6,350.5 26.00 J-55 BTC-MOD ia,': a.c, '":::°Tubing Strings Tubing Description String Ma.. ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection TUBING 31/2 2.992 37.9 7,167.6 5,896.3 9.30 J-55 EUE8rdABMOD • -Ivan-CONDUCTOR;43.0122.0 - ,.. H„h°„4,„Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Corn (in) 37.9 37.9 0.03 HANGER FMC GEN IV TUBING HANGER 3.500 1,799.1 1,781.2 20.09 SAFETY VLV CAMCO TRDP-4A SAFETY VALVE 2.812 • SAFETY VLV;1,799.1 [11 7,102.6 5,848.9 43.07 PBR BAKER 10'STROKE PBR 3.000 7,116.3 5,858.9 43.11 PACKER BAKER HB RETRIEVABLE PACKER 3.500 7,132.7 5,870.8 43.15 NIPPLE CAMCO D NIPPLE NO GO(MILLED TO 2.80"on 2.800 5/6/2016) 7,166.7 5,895.6 43.24 SOS BAKER SHEAR OUT SUB 2.992 GAS LIFT;1,938.5 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(TAD) Top Incl Top(ftKB) (MB) (°) Des Com Run Date ID(in) 7,385.5 6,055.7 42.77 WHIPSTOCK 3.5"Baker XL Tray with OH anchor 7%11/2016 0000 MONOBORE Perforations&Slots Shot Dens Top(ND) Btm(ND) (shots/ SURFACE;42.0-4,120.8 Top(ftKB) etm(ftKB) (ftKB) (ftKB) Zone Date ft) Type Com 7,244.0 7,298.0 5,951.9 5,991.5 C-4,1L-18 8/13/1991 6.0 APERF 2 1/8"EnerJet III;0 deg. ph .11 7,442.0 7,464.0 6,097.2 6,113.4 A-5,1L-18 6/12/1991 4.0 IPERF 4.5"HSD Csg Gun;180 GAS LIFT;7,045.7 deg.ph ( 7,540.0 7,550.0 6,169.2 6,176.5 AA,1L-18 6/12/1991 4.0 /PERF 4 1/2"HSD Csg Gun; 180 deg.phasing; Covered w/fill Cement Squeezes Top(ND) Btm(TOD) Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Des Start Date Co. 7,114.0 7,632.0 5,857.2 6,236.5 Cement 5/8/2016 Lay in 35 bbls of 16.5 ppg Cement(20 bbls with PBR;7,102.6I Squeeze CemNet Fiber) i Mandrel Inserts i a St tr°701:ip a' PACKER;7,116.3 A7.i on Top(ND) Valve Latch Port Size TRO Run .::'7'C')ii N Top(ftKB) (ROB) Make Model OD lin) Sery Type Type (in) (psi) Run Date Corn '+ S '. a 1 1.938.5 1,911.5 McMurry FMHO 1 GAS LIFT DMY BK2 0.000 0.0 9/24/1991 1 30 ` 2 7,045.7 5,807.3 MACCO SPM-2 1 1/2 GAS OFT DMY RK 0.000 0.0 1/25/1992 5:00 Notes:General&Safety End Date Annotation NIPPLE.7,132.7 g. 10/4/2010 NOTE View Schematic w/Alaska Schematic9.0 i i i i i i a i i i i i , II. SOS;7,166.7 ) a I�° I a i a i a i i i i a i i• i a APERF;7,244.0-7,2960-0 a i, a if a Cement Squeeze;7,114.0 RKB it a WHIPSTOCK-MONOBORE, •P a 7,385.5 • a )ai i a i i a (PERF;7,442.0-7,464.0 > a A +° ! i a i. a i. a (PERF;7,540.0-7,550.0-e a i a it a 0 a • PRODUCTION;35.4-7,788.8 AL1 LATERAL LINER;7,159.6 9,340.0 KUPD 1L-18A CtJt1OcoP Bili 15Well Attribu Mir Max Angle D TD r A iriske€.Inc, '' Wellbore APIIUWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) conocoptiihpsg°t 500292214501 KUPARUK RIVER UNIT PROD 104.81 9,060.40 10,955.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1 1L-18A,802/2016122236 PM SSSV:TRDP Last WO. 42.99 3/24/1991 Verocal schematic.(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason: ADD LATERALS lehallf 8/1/2016 Casing Strings HANGER;378 , ...i Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... WELen(I...Grade Top Thread A LATERAL LINER 2 3/8 1.992 7,845.0 10,955.0 4.60 L-80 STL Liner Details 1 . � z Nominal ID " '' " ' Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Corn (in) 7,845.0 6,108.5 91.44 BILLET Anchored Aluminum Billet 1.900 7,899.4 6,106.8 91.81 DEPLOY Shorty Deployment Sleeve 1.900 .".h CONDUCTOR,43.0-122.Od1 --- - S 5 f 8,812.4 6,129.5 90.07 DEPLOY Shorty Deployment Sleeve 1.900 Notes:General&Safety n End Date Annotation SAFETY VW;1,789.1 f'71. NOTE'. GAS LIFT,1,938 5 : :.: '::: z SURFACE;42.0-4,120.6—. ` GAS LIFT;7,0457 PBR;7,1028 PACKER,7,116.3 k A i NIPPLE;7,132.7 .it, n Z SOS;7166.7C :: h APERF,7,244.0-7,298.0 Cement Squeeze;7,114.0 ftKB WHIPSTOCK-MONOBORE; 7,385.5 f\'• IPERF;7,4420-7,464.0 Z T IPERF;7,540.0-7,550.0— n 3 PRODUCTION;35.47,788.8 - t _ f ) jii . AL1 LATERAL LINER;7,159.6- 9,340.0 A LATERAL LINER;7,845.0- j j 10,955.0 KUP D 1 L-18AL1 Cont coPhit ips Well Attribut Max Angle•D TD 4 Alaska,Inc, Wellbore API/UWI Fold Name Wellbore Status ncl(I) MD(ftKB) Act Btm(ftKB) ConoeoihiHips 500292214560 KUPARUK RIVER UNIT PROD 95.50 9470.51 9,340.0 ` ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1L-1BAL1,8/22/201612:23:16 PM SSSV:TRDP Last WO: 42.99 3/24/1991 Verocalschematw(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason:ADD LATERALS lehallf 8/1/2016 Casing Strings Cas ng Description OD(In) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread HANGER,378 ' l I AL1 LATERAL LINER 2 3/8 1.992 7,159.6 9,340.0 6,098.2 4.60 L-80 STL Liner Details Nominal ID • Top(ftKB) Top(TVD)(ftKB) Top Incl(I) Item Des Com (in) _ 7,159.6 5.890.5 43.22 DEPLOY Shorty Deployment Sleeve 1.900 ilNotes:General&Safety End Date NOTE. Annotation j1-^-^-CONDUCTOR;43.0-122.0 - SAFETY VLV;1,799.1 nn!l'� I I GAS LIFT,1,938.5 i :' SURFACE;42.0-4,120.8— I 1 • GAS LIFT;7,045.7 g‘ i (. II I :. P PBR',7,102.6 i. Z i, PACKER;7,118.3 4/,__'.!__p. i i ki i NIPPLE,],132 i C k ] + r •. 0 i k i 0 sOS,7.166.7 ' (8° _ 00 0 00 0 00 0 00 000 0 .. 0 00 0 00 APERF,7,244.0-7,2980—... `00 Y i Cement Squeeze,7,114.0 6KB + k WHIPSTOCK-MONOBORE; ^. 7,385.5 k. Y h I i t, • IPERF;7,442.0-7,464.0—t 1 ' 00 a' ( 00 IPERF;7,540.0-7,550.0 1 00 I 0.. T i • • • PRODUCTION;35.4-7,788.6 i AL1 LATERAL LINER;7,159.6- i 9,340.0 • • l Operations Summary(with Timelog Depths) VW='I 11-48 ConoccWl iilips l . Rig: NABORS CDR2 AC Job: DRILLING SIDETRACK fir%Lag • • _ • • .. . , ' 'SletipeAt SartTkps fort • Dor PYmaa Op Code'. Activity Coda ' TmsP-T-X °paragon • (9K% End!UnlitOM 7/9/2018 719/2016 1-50 PROD1 RPEQPT -CIRC P Displace wetlbere fluid to seawater 7,078.0 7,100.0 15:30 17:00 followed by 8.5ppg PowerVis milling fluid.Close EDC 7/9/2016 7/9/2018 0.40 PROD1 RPEQPT TRIP P 7,116 ft.Dry tag,PUW 34k,pumps on, ' 7,100.0 7,123.0 17:00 17:24 Rf3IH to 7,123 ft. 7/912018 7/912018 1.20 PROD1 RPEQPT MILL P 7,1231t. OBM 1.72 bpm at 2,350 psi 7,123.0 7,128.6 17:24 18:36 FS,20°R,CWT 13.8k,WOO 1.6k,4 stalls and restarts,PUW's 36 to 40k 7/0/2016 7/9/2016 3.40 PROD1 RPEQPT MILL P 7,128.5 ft. OBM 1,6 bpm at 2,060 psi 7,128.5 7,188.5 18:36 22:00 FS,CWT 12.7k,WOB.5 to 1.6k,ROP 8 to 16 iph.to casing contact at 7,168.44 ft,stall,PUW 40k.RBIH 7/9/2016 7/10/2016 2.00 PROD1 RPEQPT MILL P 7,168.4 ft. Stalling,tum IT 220' for 1 7,168-5 7,170 .0 22:00 00:00 - 1t,OBM 1.59 bpm at2,060 psi FS, CWT 1 lk,WOH . 7/10/2016 7/10/2016 1.25 PROD1 RPEQPT MILL P Continue milling 1.57 bpm at 2,060 psi 7,170.0 7,177.0 00:00 01:15 FS,CW1'11k,WOO 1.2k,ROP 8 to 10 iph 7/1012016 7/10/2016 1.76 PROM RPEQPT WPRT T Pick up above cement,pump at 7,177.0 7,177.0 01:15 03:00 - minimum',reboot BHt computers,DD . ,_ . _ _ _ _ . . . . - - - - • -- - • screen In doghouse-not-showing split- • screen but enough info to proceed, ' RBIH 7/10/2016 7/10/2018 7.75 PROM RPEQPT MILL P 7,177 it,BOOM 1.57 bpm at 2,220 psi ' 7,177.0 7,291.0 03:00 10:45 FS,CWT 12k,WOO 1.0k,ROP 10-25 fph. Stall 0 7226'.PU,CTW 39k.RBIH, resume milling_ 7/10/2016 7/10/2016 0.50 PROD1 RPEQPT WPRT P PU heavy,dragging,CTW 45k.Wiper 7291.0 7,291.0 10:45 11:15 to TOC(7120'),RBIH. 7/10/2018 7/10/2015 0.50 PROD1 RPEQPT WPRT P Couple stalls(7,291',not much 7,291.0 7,291.0 11:15 11:46 progress.PUH heavy to 7,078'.CTW up to 46k.Negative WOO 0 7170'(- 1.4k).RBIH,saw WOB spike @ 7170'(0.7k).Maintained 201ROHS • orientation.Stall again. 7/10/2016 7/1012016 1.25'PROW 'RPEQPT MILL P PU to 7282'and orient Coalface to 7,291.0 7,292.3 11:45 13:00 1601:OHS.RBIH,steal,Working pipe through squeezed parts.CTW 10.6k, . WOB 0.5k,ROP 4 FPH,1.6 BPM. Metal shavings seen in returns. 7/10/2016 7/1012016 3-50 PROEM 'RPEQPT MILL P Change orientation back to 20`ROHS. 7,292.3 7,350.0 13:D0 16:30 Continue milling ahead.Milling parameters improved once passed porfs(ban perf @t 7298).CTW 10.8k, WOB 1.5k,ROP 20-22 FPH. 7/10/2016 7110/2016 0.40 PROD1 RPEQPT DLOG P PUH.CTW 37k,0 WOB.Tie-In to K1 7,350.0 7,350.0 16:30 16:54 @ 7185'(+1'correction).RBIH,CTW I 11.8k,WOB 0.4k,0.38 BPM. 7/10/2018 7/10/2016 3.00 PROD1 RPEQPT DRLG 'P 7,350 ft. Milling 1.6 bpm at 2,460 psi 7,350.0 7,415.0 16:54 19:54 FS,CWT 11.5k,WOB 1.6k,ROP 20- 22 rph,orient TF 220°at 7,398 ft, orient back to 20'Rat 7,401 ft. ' 7/10/2016 7/10/2016 0.30 PROM RPEQPT WPRT P TD pilot hole at 7,415 ft,PUW 38k, 7,415.0 7,100.0 19:54 20:12 back ream up 20°R 15 fpm. 7/10/2016 7/10/2018 0.15 PROD1 RPEQPT TRIP P Dry drift pilot hole transition,RBIH 25 7,100.0 7,200.0 20;12 20:21 fpm,TF HS,RIW 14k,zero correction at K1,bobble at 7,173 ft,WOO 0.89. Page 2/17 i Report Printed: 7128/20/6 al 0 ..'I Operations Summary (with Timelog Depths) 11..48 r CCric)co'I;ilhpS I , Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Timl Log • r '-- Steil Depot SlaltTime Endllme Use OA Pt a by Cade j Ad1h119Cdda .TunePT-X - Operation (flf(8) End-0eprh(003) 7110/2018 7110/2016 1.40 PROD1 RPEQPT REAM P Baric ream 5 fpm 180'to 7,100 ft, 7,200.0 ' 7,200.0 20:21 21:45 ream down 5 fpm at 180° to7,180 ft. ream up at 1 fpm at 189'to 7,159 ft ream down 5 fpm at 180'to 7,183 ft. ream up 180°to 7,187 ft.PUH to 7,140 ft.Dry drift pilot hole transition, RBiH 25 1pm,TF HS,RIW 14k,bobble at 7,172 ft,WOB 027. 7/10/2016 7/1012016 0.35 PROD1 RPEQPT OWFF P PUH 39k,Flow check at7,050ft.no 7,200.0 7,050.0 21:45 22:06 Bow 7/10/2016 7/10/2018 1.30 PROD1 RPEQPT TRIP P 'POOH for caliper run. 7,050.0 62.0 22:08 23:24 7/1012016 7/10/2016 0.40 PROD1 RPEQPT OWFF P On surface,tow check,good while 62.0 62.0 23:24 23:48 performing PJSM-LD BHA ' 7/.10/2016 7/11/2016 0.20 PROW RPEQPT PULD P llnstab from well,disconnect BHA and 62.0 62.9 23:48 00:00 skid cart. 7/11/2016 7/11/2016 0.75 PROD1 RPEQPT PULD P Continue to lay down BHA#1. 62.0 0.0 00:00 00:45 7/11/2016 711112016 0.50 PROW RPEQPT SVRG P Service Infector, 0.0 0.0 00:45 01:15 7/1112018 7/11/2016 0.75 PROW RPEQPT CTOP P Install nozzle,jet stack,remove nozzle 7,387.0 01:15 02:00 7/11/2016 7/11/2018 1.50 PROW RPEQPT PULD P MU BHA#2(HAL real1me caliper)to 0.0 26.0 02:00 03:30 coil,test caliper. 7/11/2016 7/1112016 1.30 PROW RPEQPT TRIP P RIH with Halliburton caliper. 26.0 7,030.0 03:30 04:46 7/11/2016 7/11/2016 0.26 PROD1 RPEQPT DLOG P Tie in at HRZ(no correction). 7,030.0 - 7,050.0 04:48 05:03 7/11/2016 7/11/2016 2.50 PROD1 RPEQPT DLOG P POOH logging 1st caliper log run. 7,050.0 7,416.0 05:03 07:33 RBIH to 7410. POOH togging 2nd caliper run. Close caliper. 7/11/2016 7/11/2016 1.75 PROD1 RPEQPT TRIP P P0011 BYIA#2. On surface. PU and 7,058.0 0.0 07:33 09:18 inspect CT,CTC,and Caliper. 7/11/2016 7/1112016 0.50 PROD? RPEQPT PULD P LO BHA#2(caliper). 0,0 9.0 09:18 09:48 7/1112018 7/11/2016 0.50 PROD1 RPEQPT OWFF P Flow check-good. 0.0' 0.0 09:48 10:18 i 7/11/2016 7/11/2016 0.50 PROW RPEQPT SVRG P Perform rig maintenance.fnspecttop 0.0 0.0 10:18 10:48 drive/rotating tread for upcoming workover. 7/1112016 7/11/2016 1.20 PROD1 RPEQPT PULD P PJSM.MU BHA#3 In pipe shed. PU 0.0' 0 0 10:48 12:00 BHA#3. 7/11/2016 7/11/2016 1.75 PROW RPEQPT WPST P RIH with BHA#3(whipstock setting 0,0 12:00 13:45 assembly).EDC open pumping minimum rate while RIH(0.3 1PM). 7/1112016 7/11/2016 0.25 PROD{ RPEQPT DLOG P Tie In 0 Kf(+10.5'correction).Close 7,195.0 7,217.0 13:45 14:00 EPG.PU,01 W 43k. 7/11/2016 7/11/2016 0.25 PROW RPEQPT WPST P RIH oriented HS.CTW ilk.Stop Cgt 7,217.0 7,396.0 14:00 14:15 7395&PU CTW 30k to achieve neutral weight.Set whipstock.Set down weight(WOB 3.9k)to confirm set. 7/11/2016 7/11/2016 1.00 PROD1 RPEQPT TRIP P _�POOH.CTW 42k. 7,396.0 101.0 14:15 15:15 7/1112016 7/11/2016 0.75 PROD1 RPEQPT OWFF P 'Flow check-good. 101.0 101.0 15:15 16:00 7/11/2916 7/11/2016 1.09 PROW RPEQPT PULD P LD BHA#3(whipstock setting 101.0 0.0 16:00 17:00 assembly). Page 3/17 Report Printed: 7/2812016 ! ! • „•• ±•-I Operations Summary(with Timelog Depths) • '; 1L-18 - Cut incoAhifli(_s f Rig: NABORS CDR2.AC Job: DRILLING SIDETRACK Time keg _ gilt Depth. SWIM* End Tyeo Dur(tN) Phase Op Code Activity Code lime A T-X Operation '(e). End Oeprh(ntm) 7/11/2016 7111/2016 0.85.PROD1 WHPST 'PULD P MU BHA 44(2.8°whipstock mill& 0.0 74.3 17:00 17:51 diamond string reamer w/Xtreme motor at 0.6°AKO)MU to ColiTrak, surface test 711112016 7/11/2016 1.60 PROD1 WHPST TRIP P RIH with BHA#4,EDC open 74.3 7,108.0 17:51 19:21 circulating 8.6 used FloPro milting fluid 7/11/2016 7/11/2016 0.35 PROD1 WHPST TRIP P Close EDC,BHI program down again, 7,108.0 7,185,0 19:21 19.42 PU slow,PUW 38k,reboot files.RBIH 7/11/2016 7/11/2016 0.20 PROD1 WHPST DLOG P Tle into K1 for plus 11 ft correction. 7,185.0 7,221.0 19:42 19:64 7111/2016 7/11/2016 0.85 PROD1 1 WHPST TRIP P ' RIH,dry tag top of whipstock at 7,386 7,221.0 7,386.0 19:54 20:46 ft.PUH,bring up pump • 7/11/2016 77/12/2016 3,25 PROD1 WHPST WPST P Begin milling whipstock per 7,386.0 7,387.0 20:46 00:00 recommended practice and Baker rep. from 7,385.2 ft.1.7 bpm at3,205 psi FS,CWT 14k, `Top of Whipstock j 7385.21r i 7/12/2016 7/12/2016 7.75 PROD? WHPST WPST P Continue milling window per RP and 7,386.9 7,390.31 00:00 07.45 Baker rep.1.7 bpm at 3,398 psi,CWT 14k,WOB 2.0 to 2.6k,ROP 0.4-0.6 FPH Note:bled IA down to 175 psi,OA down to 160 psi 7/12/2016 7/12/2016 1.75 PROD1 WHPST WPST P WOO dropped-1k lbs indicating 7,390.3 7,393.2 01:45 09:30 bottom of window©7390.3'. Continue milling window per RP.2 FPH to allow string reamer to clean-up L window. - 'Btm of WIndowal 7390.3 ft 7/1212016 7/12/2016 2.25 PROW WHPST WPST P Continue milling with managed 7,393.2 7,406.0 09:30 11:45pressure system to 211t passed \1 P< TOWS.Gradually Increased ROP `J � \ from 3 to 6 FPM.CTW 11k,WOB 2.3k,1.67 BPM r 4310 pal. 7!1212016 7/12/2016 1.50 PROD1 4 WHPST REAM P PUH,UM/32k,167 RPM.Ream the 7,400.0 7,406.0 11:45 13:15 window area(--7384`-7396)3 times per RP @ 1 FPM.Dry drift window @ 20 FPM-dean pass through window. 7/12/2016 7/12/2016 0.25 PROM WHPST DLOG P 'POOH,tie-in to HRZ(fit 7045'(+1 if 7,400.0 7,045.0 13:15 13:30 correction). 7/12/2016 `711212016 0.25 PROD? WHPST DLOG P RIH,tie-In to K1 @ 7219'(no 7,046.0 7,219.0 13:30 13:45 correction). Note:Original well PDC log only had the K1 logged.Will use HRZ as primary depth correlation due to K1 being located in the cement pilot hole. (Do not want to slow down with bit- i centered bit in pilot hole.) 7/12/2016 7/12/2016 1.75 PROM WHPST TRIP - P POOH BHA#4(whipstock milling I 7,219.0' 89.8 13:45 16:30 assy).Open EDC.Cont POOH.P.1SM -PUD BHA 44. 7112!2016 7/12/2016 1.50 PROD1 WHPST PULD P PUD BHA#4. 89.8 0.0 15:30 17:00 7112!2016 7/12/2016 2.75'PROW DRILL PULD P LD milling na ea sine PDL MU build section 0.0 72.2 17:00 19:45 --Page 4117 Report Printed: 7/28/2016 S . _, Operations Summary(with Timelog Depths) �' , &1115.1eTis I - 1L-18 Cu,iocof'hiiIips i Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Wig Log shit oeplh, • $Idyl Time Enfhtm• e Durr} Phase OpCodo Activity Coda• 'trio P-T-X Operation _ (tiKa► End Reb�tttKef 7/12/2016 7/12/2016 1.60 PROD1 DRILL PULD P PJSM,Pressure depoly build section 722 72.2 BHA 7/12/ 7!12(2016 1,60 PROD1 DRILL TRIP P 21;15 R ,wilh build section assembly with 72.2 7,030.0 2i:15D16 22:46 1.9"bend motor,RES and RR HCG bi 21:15 -center bit.IA 165,OA 179 7/12/2016 ,7/1212016 0.25 PROW DRILL • DLOG P 17,030 ft,log the HRZ correction of plus 7,030.0 7,069.0 • 22:45 23:00 13.0 it. 7,406.0 i 7112/2016 7/12/2016 0.25'PROD1 DRILL 'TRIP P 3 069 II,fun e tion closed Lthe EDG,POW 7,069.0 23:00 23:16 correction of negative 2.0 It. 7/12/2016 l 7/13/2016 0.75 PROD1 DRILL DRLG P 7,4 BHP 6 ft,9 800,WBD 1.6 HP 443,at ,650 ps(5 209,bA 7,406,0 7.423.0 23:15 00:00 190 fi.00 PROD1 DRILL DRLG P 7,423 ',OBD 1.62 bpm at3430 psi 7,423.0 7,690.0 00:00 0 66:00 012016 012016 0FS,BHP 3785,WHP 443,IA 269,OA 00 100. Drilled hard spot @ 7511-7620'.Avg , ROP 40-50 FPH afterwIth avg W013 1.5k. I 05.5 7/13/2016 7/1312016 1.75 PROD1 DRILL TRIP F POOHlwveHA 1t(bull pump maxOpen 7,590.0 06:00 07A6 Jog 2159'-2375',saw increased 1 • cuttings In returns(unloaded wet). 7/13/2016 '7/13/2016 2.25 PROW DRILL PULD P PJSIVI,POD BRA 45.RSM{b5leLr Motormotor. .Install 85.5 0.0 07:45 10:00 FVS for BHA In mouse hole. - 7!13/2016 7/1312016 0.25 PROD1 DRILL SVRG P RIg maintenance,pull RF mats. o-o 0.0 10:00 10:150.0 69.2 7312016 /1312016 I 1.50 PRODS DRILL PULD P center bitw RSM,CR,Resisivflty, 100:15 1 11:45 CCL).Test MWD,strip on WH, equalize,tag stripper. 7/13/2016 7/13/2016 1-50 PROD1 'DRILL 'TRIP 'P RIH BHA*6(RSM). 692 • 7,026.0 1145 1315 7/13/2015 7/1312016 0.25 PROD1 DRILL DLOG P Close B CRZ(+12 ft correction). 7,025.0 7,082.0 13:15 13:30 7/1312016 7/13/2018 0-25 PROD1 DRILL 'TRIP P Continue 811-1.window.Pumps pStaci of n • 7,082.0 7,400.0 13:30 13;45 7390'(bottom of window).PU,pump al min rate,pumps off,RIH,took weight but passed through. 0257DLOG P Log RA In whipstock,Located 0 7,400.0 7,415.0 13:45412Q16 ' 612016 �PROD1 J DRILL 7,392.Corrected TOWS to 7,386'. 14:60 7,415.0 7,704.0 7113/2016 7(1312016 2.00 PROD1 DRILL DRLG P C7t9 psi FS..OB D 1.8 63 BPM t i 60 14:00 • 16:00 -70 FPH,01W 10.5-11.5k. New mud at bit(7620'.New mud at • surface®.7690'. Loosing pumpprime,PU to 7,635', 7.704.0 7,704.0 7/13/2016 7/13(2016 0.25 PROD1 DRILL DRLG 'P Loosi GTW 3 . 16:00 16:153727 7/1312016 711312016 3,60 PROM DRILL DRLG P D 3O,�g 5®OP7P81.0 7,704.0' 7,940-0 16:15 19:46 - H 7113/2016 7/13/2016 0.50 PROD1 DRILL WPRT P Wiper 3814 psi FS. CTW 39k•1.72 7,940.0 7,400.0 19:45 20:15 7,400.0 7,940.0 ►7/13/2016 7/1312016 0.25 PROD1 DRILL WPRT P RBLH from window. 20:15 20,30 8777 si A 7,940.0 8,158.0 23!2016 7/1412010 3.50 PROD1 DRILL DRLG P ROP 69 FPH after BOW,1.7 PPMiper.CTW 11..1k- 200:3Q 00:00 1.6k. -- Page 6117 Report Printed: 7/28/2016, Si • ` . inivistiva Operations Summary(with Timelog Depths) ,;, &W is - i 11,18 cenc,ccwroip` I Rig: NABORS CDR2-ACJob: DRILLING SIDETRACK • •. _ TD with clion If l 7/14/2016 0.75 ROD1 DRILL DRL P Continue drilling to MOO ' 0 6,200.0 •11 1 7/1412016 7/14/2016 0.60 PROD1 DRILL P • *H. Perform annular friction pressure loss 00:45 1 calibration 1 7400',1 FPM coif speed. Rate In=1.62 BPM,Rate out=1.61 - BPM, . Annular Pres=3705 psi,Choke Pres-4450 psi,WHP=429 psi.MW ' In=8.6pp9,MW out=8.7pp9• POOH, ,EDC 0 7120'. 7,400.0 79.4 7114/2016 7/14/2016 1.75 PROD1 DRILL TRIP P Cont. 1 03:000 r 1 1 11 ••f D. • Dlateral BHA/16(RSM+ 79.4 used HCC� 03:00 1 1/70/5 1 + 1 i 1 7114/ 0016 ••D +- PULD 1••. , ,• r► 06:46 •� : + : • 1 f + + f 7114/2016 1 '•' DR 07:00 1 1 f 0.0 1 . 7114/2015 .1 ..• f• PULD P _ _ _-•srourae Gttlevset sale- • •f f' 07:00 08:30 psi.Changedamaged Injector f + e r 7114!2018 + '•• DRPULD •over,MU•C,open• BVs.Finish08:30 09:15 , 1 + 1 1 7/14/2016 PROD1 DRILL TRIP P RIH.Tie-In HRZ(+11.5* 0911:00 Close FM.CTW 34k(gr 7622'.Saw •: .. n 1 :• :•:: 1.6 BP a 1 , 8,201.0 Irl 1 • 1 ii ,+It,wiper up hole P W 42 8,590.0 7,595.0 7/1412016 7/14/2016 0.50 PROD1 DRILL WPRT P 17:15, 17:45 1 6,590,0 7114/2016 0 0.26 PROD1 DRILL WPRT P 7,59511,wiper back In hole,RIW 12 k 7,595. 17:45 rrBleed down IA:If psi to 240 OA 800 psi to 270 psl. •. tl •. 1.68 bpm .11 8,590.D 8,687.0 7/1412016 + • 11 PROD1 DRILL r ,•. 1$:00 1 1 f FS,BHP 265 PROD' D' trolUble gelling weight to bit, + f 714{2018 • = 20:00 18,828 ft,lowered pump rate,RBIH establishedshort distance,PUW still heavy 38 k, I slowly PUH, full returns, performed wiper up to the...........: circulating a BTMS up.No shale In '242016 7/14/2016 1 •• , •n ••- :` :. • 1 8,687.0 ,693 ft,wiper back ln hula, 290:45 1hole, • 7 bilm at 3,500 7114/2016 7/16/2016 2.60 PROM •• BOBO •'p •' 21:30 11 ++ BHP 3845,WHP 367,IA 7116/20 6 7 15/2016 4.50 PROD1 DRILL DRLG P 8,795 ,•,:•,WHP 427,IA303549. 9,017.0 00:00 04:30 BHP A 271 f+ . n 9,017.0 9,020.0 7/76/2016 + 0.50 ••• •• passedB855',lowered rale 5 , 04:30 05:00 :•:: 1.5 BPM ig)3684 psi AP,.•. •1 Page 6117 Report Printed: 7/26/2016 III S Operations Summary(with Timeiog Depths) ccnc,cc hd ps j . Rig; NABORS CDR2-AC Job: DRILLING SIDETRACK TWO Log sta,tDepth Code /Wildly Code Timer,44(( Dperaten ,KB. End Depth aimT 'a End Time Our n0 Op PUH,wiper to window.Pulled tight 9,020.0 7,400.0 0 05:00 0 6 0 06:0001 2016 1 AD PROD1 DRILL(43k)t 8855',8602'-8576. 7/1512016 7/15)2016 0.10 PROD1 DRILL DLOG Tle-In to RA(+4 ft correction). 7,400.0 7,436.0 06:00 08:06 7/16/2015 7/15/2016 1.40 PROD1 DRILL WPRT RBIH, stack ouu Q 82ng30.g8t 8708',8 5 7,436.0 9,022.0 06:06 07:30 annular pressure spiking.C11/1147k. Pumped 5x5 sweep.No shale chunks In returns,just individualized particles (silt stone). I3OBD,1.54 BPM r@ 3333 psi FS, 9,022.0 9,038.0 07/15/20160.5fl PROD1 DRILL DRLG WOB 1.2k,ROP 51.Geosteer up 95° 0773/2016:30 O8 08:00 +.Packing off @ 9038'.Lost WOO. PU,CTW 47k. 7/15/2016 111512016 PRODi DRILL DRLG 13013D,1.54 BPM @1.3510 psi FS, 9,038.0 9,165.0 11:15 CTW 7k,WOt31.3k,ROP 46,iA 349, 08:00OA 278. Geosteer up to 100°. •. 7/15/2016 7/15/2016 0.25 PROW DRILL WPRTR H iW r to regan C'T�W 45k. 9,165.0 9,165.0 11:15 11:30 ;711512018 711612016 1.50 PROD1 IRO DRLG P BOBO,1.55 BPM(0 3580 psi FS, 9,185.0 9,192.0 .11:30 13:00CM6k,WOB 1.1k,ROP 24. Lost surface weight(CTW-4.0k)and packing oft.PU,CTVV 49k. 7/15)2016 7/1512016 _ 0.50 PROD1 DRILL DRLG P 801 ROP 2R2.M f 3534 psi FS,WOB • 9,192.0 9,199.0 13:00 19:30 PU to regain CIW,PUW 39k. • "°`"Note:New mud to bit 9 9,291 ft 7/15/2016 7/15/2016 5.50 PROM DRILL WPRT P at 3,360 BH Fwiper,BOTI386D 1.55 pm. 9,199.0 9,313.0 13:30 19:00 lA 141,OA 250 7/15/2016 7/15/2018 1.00 PROD1 DRILL WPRT T9,313 ft,PUW 43 k,woleto keep k pipe to eiiigoht onabit, 9,313.0 7,400.0 19:00 20:00 stili having trouble keeping weight on bit,perform wiper up hole Ihru high gamma area,work pipe 40 k to 54 k, up to minus 4k DHWOB, 7/15/2018 7/15/2016 • PROD1 DRILL 8,57011,.Iscussed with town the 7,400.0 7,400.0 20:00 21:45 troubpullinup , sion577.1 s made le to dl the holeholedecision from 8, t to the window,pumping 5x5 sweep. perform Jog before the EOB 7,690 ft, PUH thru build section,primp 5x6 sweep end perform 5 jogs In build section to clean hole, 7/15/2016 7/1512016 2.00 PROD1 DRl7,400 ft,POOH,pumping 1.54 bpm al 7,400.0 72.2 21:45 23:45 3,480 psi,following manage pressure. perform Jog at 850 ft to 1150 ft. "•Note:Perform choke calibration In rate:1.51 bpm Out rate:1.51 Mud wt In:0.60 ppg Mud wt cut:8.62 Annular:3749 Choke:500 WHP:511 7115/2016 7/16/2016 0.25 PROD1 DRILL PULD PJS ,for undep oying lateral BHA 72.2 23:45 00:0072.2 0.0 7/16/2016 7/16/2016 1.50 PROD1 DRILL PULD Undeploy drilling pHA#7 00:00 01:30 0.0 1 7/16/2015 7/1612016 2.00 PRODDRILL PULD 8HA#ereconfiguro BRA,PU 01.30 03:30 Page 7/17 Report Printed: 712812016 i i • Operations Summary(with Timelog Depths) aWf!r rD i t% IL-18 CcrriocoIIiillips • Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log, ' seri bepih SledTeTe End ilmbu e r Or) Phase. Op Code Aeliva Cade Time P 7X Opetl eon. (d KB) End Depth(trial 7/16/2016 7/18/2018 2.00 PROD1 DRILL TRIP T RIH,with OH Anchored[fillet BHA#8 73.6 7,025.0 03:30 05:30 7/1612016 7/1812016 025 PROD1 DRILL 'DLOG T 7,025 ft,Log the HR2,correction of 7,025.0 7,077.0 05:30 05:45 +12.5 it. - 7/16/2016 7/16/2016 0.75 PROD1 DRILL TRIP I Giese EDC,weight check,RIH. 7,077.0 8, 05:46 06:30 7/16/2016 7/1812016 050 PROD1 DRILL WPST T WI check.Get on setting depth.PU to 8,400.0 8,451.8 06:30 07:00 neutral wt.Pumps on gradually increasing to set billet.Set down 3k WOO to confirm set. 7/16/2016 7/16/2016 2.00 PRODI DRILL TRIP `f POOH.Open EDC io 7100'.Cont 8,451.8 82.0 07:00 09:00 POOH. 7/1612018 7/16/2016 2.00-PROD1 -DRILL PULD T Taup,space Tag Lay down billet sseal g PUD BHA 82.0 0.0 09:00 11:00 ol, reconfigure MIND,PU motor. SIMOPS:PDS personnel checked their connection to rig depth counter for real-time caliper 7/16/2016 7/16/2016 1.00 PROD1 DRILL -PULD T HPJSM,YD PDI Ae 90,7'AKO+RR 0.0 72.0 11:00 12:00 7/16/2016 7/16/2016 1.50 PROD1 'DRILL TRIP T RIHBHA 49. 72.0 7,025.0 12:00 13:30 - 7/16/2016 7118/2016 0.50 PROM DRILL DLOG T Tie-in to HRZ EDC.Log 7 markerto )). 7,025.0 7,200. ` 11 K 13:30 14:00 depth(no correction). 7/16/2016 7/16/2016 0.75 PROD1 DRILL TRIP T Cent RIH.Tag up al 8231 ft,0.65 7,200.0 8,441.0 14:00 14:45 bpm.Dry tag al 8441 ft.PU(PUW 37k),pumps up,work down to TOO. 7/16/2016 7/18/2016 1.25 PROD1 DRILL DRLG T Timf 8e4m milling billefL t 2 p FPH,milled 8,441.0 6,444.0 14:45 16:00 not much Increase WOB. 7/16/2016 7/16/2016 0.26 PROD1 -DRILL DRLG T Drilling ahead. Bk 1.53ROBPM 5, ©3340 psi 8,444.0 8,465.0 16:00 16:15 7/16/2016 -7/16/2018 0.50 PROD1 DRILL WPRT T 8,465 ft,PU above bIDet,dry drift 8,465.0 8,465.0 16:16 16:45 clean,RBIH lo bottom. I 7/16/2016 7/16/2016 5.75 PRODI DRILL DRLG T 8,413-. BHPB64D 1.42 Pb382 t 323,5 psi 8,465.0 8,719.0 16:45 22:30 246 7/16/2016 `7/16/2016 0.60 PRODI DRILL WPRT r 8,7719 up hole stacking nthweigm weight, perform at 8,719.0 8,470.0 22:30 23:00 wiper8,470 ft 7/16/2018 7/1812016 0.25 PROD1 DRILL WPRT 1 8470 ft,wIper back In hole,R1W 9.5k 8,470.0 8,719.0 23:00 23:15 • 7/16/2016 7/17/2016 0.75 PROD1 DRILL DRLG T 8,719 ft,8000 1.67 bpm at 3510 psi 8,719.0 8,761,0 23:15 00:00 FS,BHP 3803,WHP 442,IA 324,OA 246,CTSW Ok,ROP 60 fph 7/1712016 7/17/2016 1.75 PROD1 DRILL DRLG T 8,761 ft,0130 1.55 bpm at 3,837 psi, 0,761.0 8,840.0 00:00 01:45BHP 3822,WHP 351,IA 356,OA 251, CTSW-Ok,DHWOB-1.B1c,ROP 50 fph 7/1712010 7/17/2018 0.50 PROD1 DRILL WPRT 7 0,840 ft,wiper up hole POW 36k 8,840.0 7,840.0 01:45 02:15 7/17/2016 7/1712016 0.50 PROD1 . DRILL WPRT IT '7,840 ft,wiper back in hole,'RIW 7,849.0 8,840.0 02:15 02:45 7/17/2016 7/17/2016 1.75 PROD1 DRILL • DRLG T 8,8401t,BOBD 1.55 bpm at 3,550 psi, 8,840.0 8,925.0 02:45 04:30 BHP 3849,WHP 354,IA 371,OA 255 Page 8117 Report Printed: 712812016 • • 1 Operations Summary(with Timelog Depths) , �.I Wens 1L-18 I ' C nocoi hiilips • ig: NABORSABORSCD 2-AC Job: DRILLING SIDETRACK Time Log - sieretieP>ri sIetT i . End rime Dar Or). . Phase Op Code AWMtyCode. Time PT-X (venom (tt B) endnept(l8) 7/17/2(116 7/17120f6 3.25 PROD1 DRILL DRLG T '8,525 ft,OBD 1.52 bpm at 3,778 psi, 6,925.0 9,027.0 04:30 07:46 BHP 3,840,WHP 340,IA 371,OA 255,CTSW-0,DHWOB-2k,ROP-40 fph. GEO-large!100°t-looking for A5 sand. 7/1712016 -7R712016 2.00 PROW DRILL DRLG T Drilling ahead,1,54 BPM @ 3735 psi, 9,027,0 9,100.0 07:45 09:45 WOB 1.2k,ROP 33. GEOderget 105'+cross culling A5 sand, 7/17/2016 7/17/2016 0.25 PROD1 DRILL WPRT T 100'BHA wTer tap.-6-"gr )36k. 9,100.0 9,100.0 09:46 10:00 7/17/2015 711712016 2.00 PROD1 , DRILL DRLG T BOB WOB 1k,ROPi3670 20.Drilling i,CTSW 9,100.0 9,148.0 I 10:00 12:00 parameters ok,continue to cross cut A6 to assist geological Interpretation of area. I 7/17/2016 7/1712018 0.50 PROD1 DRILL WPRT T 100'BHAwiper trip.CTSW 39k. 9,148.0 9,148.0 12:00 1230 • 7/17/2016 7/17/2016 125 PROD1 DRILL TRIP T BOBD,CTSW 8.5k,WOB 1.1k,ROP 9,148.0 9,184.0 12:30 13:45 . 0 7/17/2016 7/1712016 1.75 PROD1 DRILL TRIP T POOH,CTSW 39k.Couple tight spots 9,184.0 7,600.0 13:45 15:30 . with CTSW and bore pressure Increases while PUH from 8970'to 8555'.Pump 5x5 and chase up'from 8400'. 7/17/2016 7117(2016 5.75 PROD1 DRILL TRIP T Pulled heavy(CTSW 48k)g 7542'. - 7,600.0 7,405.0 15:30 21:15 Build section from 7511'to 7542'In bad shape-Pulling heavy,packing off, stacking while trying to clean.Made 5-r passes to clean... 7/17/2016 7/17/2016 - 025 PROD1 DRILL DLOC T 7405 ft,tie Into the RA correction of 7,405.0 7,418.0 21:15 21:30 plus 4.0ft. 7/17/2016 _ 7/17/2016 0.50 PROD1 DRILL WPRT T .7418 it,RBIH thru build section clean, 7,418.0 8,410.0 21:30 22:00 pump 10x10 sweep,continue RIH, while circulating sweep down hole to 8,410 ft. 7/17/2016 7/17/2016 0.50 PROD1 -DRILL WPRT T 8,410 ft,wiper up hole to window. 8,410.0 7,000.0 22:00 22:30 7/17/2016 7/18/2016 ' 1.50 PROD1 DRILL 'TRIP T 7000,m aOt w open EDCperforpumpingug Jogs 7,000.0 1,948.0 22:30 00:00 1at 5,478 ft 7/18/2016 7/18/20-16 0.50'PROD1 DRILL TRIP T 1,948 ft,continue POOH,performing 1,948.0 72.2 00:00 00:30 Jog at1,500 ft down to 2,182 ft. 7116120 6 7!18!2016 1.25 PROD1 'DRILL PULD T PJSM,undeploy drilling t3HA#9 72.2 0.0 00:30 01:45 7/18/2016 7118/20/6 1.25 PROM STK PULD T anchored P MU tting loots with open hole. 0.0 0.0 01:45 03:00 Inspect choke,clean and Inspect INJH chains and counter. 7/18/2016 7/18/2016 1.25 PROM STK PULD T Deploy billet#2 setting BHA#10, 0.0 74.0 03:00 04:15 • Inspect&change pac-off. 7/18/2016 7118!2016 1.75 PROD1 STK TRIP T RIH with Open Hole Anchored billet. 74.0 7,025.0 04:15 06:00 7/1812016 7/18/2016 0.25 PROD1 STK DLOG T 7025 6 t,tie Into the ftClose DC:.RZ corrcheectionk of 7,025.0 7,220.0 06:00 06:15 36k),Verify depth by logging K1(zero correction). 7/18/2016 7/18/2016 0.75 PROD1 STK TRIP T R111-111o setting depth.No issues 7,220.0 8,422.0 06:15 07:00 passing through build section. Page 9117 Report Printed: 7/28/2016 • / ,, Operations Operations Summary(with Timelog Depths) t y;.'i & 1L-18 • Csinocol'hiilips i Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Triftli.Log __ Slettepih Siert-Me End7kno nurh4 - Pima OP oda AcWly Cade Time P TaOper4llon . r, 1 EudPepht l 8 422 0 7/18/2Ti6 7118/2016 0.25 PROD1 STK WPST T P8410'.to nneutral Verik fight.Set t sot billet.OB 8,,�22.Q , 07:04 07:15 12 3.5k WOB. 7/18/2016 7(18/2015 225 PROW 1 STK TRIP T POOH.Opens Eace DC @P7000'. M to.POOH. 8,422.0 85.8 07:16 09;30 Tag up,1€10. 7/16/2018 7118/2016 2.25 PROD1 STK PULD T PUD BHA#10.Reconfigure BHA. 86.8 0.0 09:30 11:45 7/18/2016 -7/1812016 1.00 PROW STK PULD T PD BHA Pry # 1(D.9'AKO btknom BHA#9 0.0- 722 m orce sam 11:45 12'45 graded 1-1). 7/1812016 7/1812016 1.50 PROD1 STK TRIP T RIH BHA#11. 722 7,015.0 12:45 14:15 7/18/2016 7/18/2016 0.50 PROD1 STK DLOG T "Tie-In to HRZ(+33.5 ft cormdiod). 7,015.0 7,068.0 14:15 14:45 Close EDC. 7/1812016 7118!2016 0.75 PROW STK TRIP T Wt check{CTSW 95'1)•RiH.Dry tag 7,068.0 8,410.7 14:45 15:30billet @ 8410.7 ft. 7/18/2016 .7/1812016 4.00 PROW STK DRLG -T PU,bring on pumps,RIB,and drill off 8,410.7 8,440.0 15:30 19:30 of billet 5,40,20 fph continue drilling to 6,440 It,PUH to 8,394 ft,clean dry drift thru billet area.RRIH 7/16/2016 7/18/2016 3.50 r PROD1 DRILL DRLG T 8,394 DUH forft,Drill ahead Ba HA 8,440 PUW ft to 8,440.0 8,710.0 19;30 23:00 33 k 7/18/2016 7/19/2016 ' . 1.00 PROW DRILL DRLG T 8,710 ,10HP 3 8BDD.5 b m2at,360,OA 052 psi 8,710.0 23:00 00:00 251 7/19/2016 7/19/2016 0.75 PROW DRILL DRLG T BHP 839,WHP 245,IAat 866 psi ,4 8767 ft,OBD 1.4 bpm 251 8,767.0, 6,840 00:00 00:45 [ ( 8,840.0 7,840.0 7/19/2016 7/19/2016 0,50 PROW DRILL WPRT 'f 8840 mpft, rwate up hole increasing si,PUW 00:95 01:15 38 k. 7/19/2016 7/19/2016 0.50 PROW DRILL WPRT T 7840 ft,wiper back In hole,RIW 9 k 7,840.0 8,840.0 01:15 01:45 I___._-- 967.0 7119/2016 7/19/2016 1.50 PROD1 DRILL DRLG T 80 BHP 3,BOBD .5 32pm,4 33at , OAsi, 8,840.0 8, 01:45 03:15 _ 6,967,0 8,957.0 7/19/2016 7/19/2016 0.26 PROD1 DRILL WPRT T Short wiper,CTSW 38k. 03:15 03:30 7/19/2016 /7/19/2016 1.50 PROD1 DRILL DRLG T 1302k,WOB 2 8P,ROP 46. psi,CTSW- 8,967-0` 9,040.0 03:30 05:00 r I 9,040.0 9,040.0 7/19/2016 7/19/2016 0.25 PROD1 DRILL WPRT T Shoal/viper,CTSW 36k. 05:00 05:15 9,081.0 7/19/2016 7/19/2016 9.25 PROD1 DRILL DRLG T 130130.112 0.280 WOB 2B k f Opsi, P 34. Trying to 9,040.0 05:15 06:30 Keep 2k+WOB to achieve planned 15`doglegs.Begin taking returns to TT for mud swap to system#3. 7/19/2016 7/1912016 0.50 PROW DRILI WPRT T 300'short wiper,CTSW 40k. 9,081.0 9,081.0 06:30 07:00 9.0131.0 9,129.0 7/19/2016 17/19 2 0.75 PROW DRILL DRLG T 0080.1.4 8PM 143715 psi. 07:00 07:45 7/19/2016 7/19/2018 0.25 PROD1 DRILL WPRT T 100'Shortwiper,USW 38k. 9,129.0 9,129.0 07:46 08:00 9,129.0 9,240.0 7/10/2016 7/19/2016 2.25 PROD/ DRILL DRLG T Naw mud system#3(added 1%Lo- torq)OB:00 10:15 to bit®9178 ft. Page 10/17 Report Printed: 7/28/2016 i A • ____ __ '" '' Operations Summary(with Timelog Depths) ,,, p - 1 L-18 LcfOCOE'1ZitIips t Rig: NABORS CDR2 AC Job: DRILLING SIDETRACK timeLog - p "statnopm sr/471/14Ac4AIe End 71ma Our{hr) Phase Op Code /Code 1 ie P-7 X � npeierion {dK1) End nePlh(tt*3) 7/19)2016 7/19/2016 1.00 PROD1 DRILL WPRT T Wiper to 8,500',PUW=37K,RHIt1. 9,240.0 9,240.0 10:15 11:15 - 72/191 016 7/19/2016 1.30 PROD1 DRILL DRLG T 'BOBD:1.52 BPM @ 3,880 PSI, 9,240.0 9,313.0 11:15 12:33 BHPa3,880 PSI,CTW=9K, WOB=1.aK,ROP=.70. 7/19(2016 7/19/2016 3.25 PROD1 DRILL DRLG P 13OBD:1.6313PM @ 3,920 PSI, 9,313.0 9,590.0 12:33 15:48 BHP=3,910 PSI,CTW=8.6K, - WOB=1.5K.ROP`75.Increase KCI. and KlaStop to mud system.Per town, POOH for agitator&low bend motor. 7/19/2016 7/19/2016 1.20 PROD1 DRILL TRIP P POOH far agitator.PUW-36KIbs. 9,590.0 7,524.0 15:48 ' . 17:00 7/19/2016 7/19/2016 4.50 PROD1 DRILL TRIP P -Pulling heavy at 7524 fl.Work BHA to 7,524.0 7,409.0 17:00 21:30 try and pull(hough tight hole. Occasional packing off.Pump 5X5 bsweep to dear cuttings.No increase _ in cuttings observed with sweep at . surface.Continue to work BHA.Roll to as drilled toolface. Jog down to 8,000 ft.PUH past problem area to 7409 ft.RBIH to 8000 ft,PUH to confirm hole Is clean,Slight bobble,but otherwise clean. 7/19/2018 7/19/2016 2.00 PROD1 DRILL TRIP P Continue POOH with BHA#11..Bump 7,409.0 74.0 21:30 23:30 up and space out. . 7/19/2016 7120/2016 0.60 PROD1 'DRILL PULD P PUD BHA#11. 74.0 74.0 23:30 00:00 7/20/2016 7/20/2016 1.00 PROD1 DRILL PIJLD P Continue to PUD and LD BHA 4111. 74.0 0.0 00:00 01:00 7/2012016 7/20/2016 2.00 PROD1 DRILL PULD P MU lateral drilling BNA#12 with 0.0 78.0 01:00 03:00 Agitator,0.4+°AKO motor and RB HYG bit.PD BHA 412. 7120/2016 7/20/2016 2.75 PROD1 DRILL TRIP P Bump up.reset counters.RIH with, 78,0 9,593.0 03:00 05:45 BHA#12.Shallow test agitator BHA, Good test Continue running In the hole.Tie In to the HRZ for a plus 11 ft correction,weight check 34K,continue in hole,RIH weight 9K. 7120/2016 7/20/2016 8.50 PROD1 DRILL DRLG P -BOBD:Trouble getting started drilling. 9,593.0 9,890.0 06:45 14:15 Drill ahead 1.46 BPM(413,910 PSI, BHP=3,940 PSI,CTW=8K,WO11=1 K, ROP=40-50.Only have push for 20-30 minutes,before mini wiper needed, several 100-300 wipers needed to - regain weight transfer.Add additional 1/2%tubes to active system. 9/20/2016 17/2012016 0.90 PROD1 'DRILL WPRT P Early wiper to 9,125',PUW=42K, 9,890.0 9,690.0 14:15 15:08 RBIH. 7/20/2016 7/20/2016 1.35 PROD1 DRILL DRLG P 130BD:1.45 BPM 0 4,145 PSI, 9,890.0 9.938;0 15:09 16:30 BHP=3,915 PSI,CTW=BK.WOB=1, ROP=60.Minimal improvement after wiper,start batching up 60 bbl beaded pill Stacking wetght.Multiple restarts. Page 11117 - Report Printed: 7128/2016 II iOperations Summary(with Timelog Depths) 11 �` , sc 1L-18 ConocOF IsiHips Job: DRILLING SIDETRACK Rig: NABORS CDR2-AG ;. lime Lag, ' suhnapn •_ F ��.t Phase DO Cede AclMty Code Time P T X ppemfion l� Steimm End7tme ..Burthrl 9,938.0B . 1)1111 0 16:3/2018 782012016 1.50 PROD1 DRILL DRLG P followed by30bbls mud. Continue 18:30 18:00 drilling ahead,1.4/I BPM @ 4,100 PSI, 13HP=3,930 PSI,CTW -3 to+8 K, WOB©.6,ROP=15-40 fill. Continuing 10 stack weight, DRLG F' PU and restart,PUW=48 Klbs, 9,985,0 10,139.0 7820/2018 210!2016 3.00 'ROD1 DRILL Continue drilling ahead,1.40 BPM 16:00 21:00 4,010 PSI,BHP=3,940 PSI,CTW=3- 6K,WOB=1.2,ROP=50-80 fph.Begin stacking weight again. r stall wiper id to the tubing lata to 10,139,0 7,067.0 21:01201823:15 16 2.2� PROD1 DRILL WPRT . P clean ubuild section.No Issues 21:00 23:15 pulling up through the open hole. Jog down at 7600 ft.PUH through build _ and kilo the tubing tail. 7120/2018 7/20/2016 0.60 PROD1 DRILL CIRC P Open EDC.Increase pump rate to 1.8 7,057.0 6,995.0 BPM to flush tubing.No increase in • 23:15 23:45 cuttings over the shakers ati3U. Close EDC.R131171.Steck weight at the 6,995.0 7,395.0 2 00:012016 0.25 PROD1 DRILL WPRT P window.Roll TF from HS to 10' 233::4/20ifi 45 00:00 ROHS.Clean pass through window. 7/21/2016 7/21/2016 0.25 PROM DRILL WPRT P Continue to RIH. 7,395.0 7,410.0 00:00 00:15 Tle In to RA for a+5.5 ft correction. 7,410.0_ 7,427.0 7/21/2016 7/21/2016 0.25 PROW DRILL DLOG P 00:15 00:30 .i--` Continue into open hove.Slacked 7,427.0 70,139.0 012016 0/21/2016 1.00 PROD1 DRILL WPRT P weight at 7506 R,7550 ft,8890 ti, 00:30 01:30 Stacked weight again at 9,100 it,Had to stow pump rate to get past this section.Continue in the hole to bottom. ' 7/21/2016 7/21/2016 2.65 PROD1 'DRiLL DRLG P BOBD.1.45 BPM at 4167 PSI.CTW= W. 10,340.0 2.3 Klbs,WOB=1.7 Klbs.ROP=90 01:30 04:21 FPH. 7/2112016 7/2112016 0.05 PROD1 DRILL WPRT P Wiper trip to 9,500',PUW=4ftK,REIN_ 10,340.0 10,340.0 04:21 05:18 112016 BOSD.1.43 BPM at 3995 PSI.CTW= 10,340.0 10,540.0 0 712712016 6.25'PROD1 DRILL DRLG P W 4Kibs,WOB=1.2Klbs.ROP=50 05:18 11:33 FPH.BHA wiper @ 10441'.Start losing WT,pump 15 bbl beaded pill, walling on beads,PUW=50K,minimal - impact from beads,start pumping new mud system,mud at bit 10,475'.Able to maintain ROP of 55. LL tif11'RT P iper to 0,500',PUW=42K.RBIH was 10,540,0 10,540.0 712112016 7!2112016 1.20 PROD1 DRILL 10,060',continue In hole. 11:33 7/21/2016 BOBD.1.43 SPM at4075 PSI.CTW= - 10,540.0 10,740.0 12:45 U16 18:30 5.75 PROW DRILL DRLG P 3 Klbs,WOB=1 Klbs.ROP=40. 1 ) 1/ 7121/ 7129!2016 7!21!2016 2.00 PROD1 'DRILL WPRT P- Start���UHi`ortie inwiper irip.PUW= / 10,740.0 7,410.0 18:30 20:3D Pull Into tight hole at 8990 It.PUW 52 Klbs.Work pipe to get free. Poor hole conditions In the build section.Jog down from 7,450 ft to 7650 ft MK Tie In to RA for a+7 ft • 7,410.0' 10,740.0 2 6 7121/2016 2.00 PROD1 DRILL WPRT P correction.Continue to the hole,Stack 200:30:30 222.30:30weight at 7550 ft,755511,7635 if,and 10,065 ft. — Page 12(17 Report Printed: 7/28/2016 • • ., _ . lOng Operations Summary(with Timelog Depths) i` r; I�{T ( IL-18 . 07:R0W-1110ips f Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK lkitZLog • Stedoapv Slartlime _ 1 End.Tlma Dur(hi) Phioa OpcAde Ao6vayCild' TimePTX - Operation '' ' . •OKR)- F.ndDeptf(MM). 7/21/2016 '7/22/2016 1.50 PROD1 DRILL DRLO P BOB Kibs 5 BPM at1 4060psi.RpOPC 20-TVV= 10,740.0 10,790.0 22:30 00:00 40. Stack weight at 10787 ft_PU and restart PUW 62KIbs. 7/22/2010 7/22/2016 1.50 PROD1 DRILL DRLG P Continue pse.CTW drilling -1.8 Kibs WOB head.1.46 BPMat t 10,790.0 10,842.0 00:00 01:30 4Kibs.ROP=20-40. Stack weight at 10842 ft.PU and restart.POW 53KIbs. 7/2212016 7/22/2016 2.00 PROD1 DRILL DRLG P Continuo drilling 15 bbl beaded pillsead.1 ppb Start t p roping 10,842.0 10,861.0 01:30 03:30 Beads) followed by 30 bbis of mud. Lulls to no Improvement in weight transfer.Sill stacking weight. 7/22/2016 7/22/2016 0.50 PROD1 DRILL WPRT P StarUH t o ywip0ertrip.PUW=48Kibs. 10,861.0 10,100.0 03:30 04:00 7/2212016 7/22/2018 0.50 PROD1 DRILL WPRT P RBIH.RIW=7-9 Kibs. 10,100.0 10,861.0 04:00 04:30 • • 7122/2016 7/22/2016 325 PROD1 DRILL DRLG P Continue 1 driling CTW=ahead..0 RPOBM at t1.4 10 ,661.0 10,950.0 04:30 07:45 41Kibs.ROP=90.BHA wiper(ti) 10,912',200'wiper , 10,992'.and • BHA wiper 0 10,946'to regain WT. Town called TD a 10,950'.Pump 10 x • 10 to/hi vis sweeps. 7/22(2016 7122/2016 ' 1.75 PROD1 - DRILL WPRT P Chase sweeps to swab,jog @ 7;6/10' 10,950.0 80.0 07:45 09:30 to 8,000',continue OOH,hole clean. . 7/22/2016 7/22/2016 4.76 PROD1 DRILL TRIP P Tag up,mset counters.RB]H fOr 80.0 10,955.0 09:30 14:15 - corrected TO,tie-In at HRZ for+11.V correction,PUW34K,continue in hole,saw 7,555',9,137',and 10,262'. Tag corrected TO(0)10,955'. ' 7/22/2016 7/22/2016 3,76 PROD1 DRILL CIRC P P0011 laying in beaded liner 10,955.D 80.0 14:16 18:00 pill/completion fluid,paint EOP flags (. 8,700'&5,100',continue OOH. 7/22/2016 (7/22/2016 0.50 PROD1 DRILL OWI=F Puteftowcheck.Stalin. 80.07 80.0 15:00 10:30 7/22/2016 7/22/2010 1.00 PROD1 DRILL PULD P LDagitator graded HA#12.B'A I good 80.0 0.0 18:30 19:30 7/22/2016 7/22/2016 0.50 COMPZI CASING POLO P safety joint Prepare rigt floor.finer. liner Stage 0.0 3.0 19:30 20:00 running tools. 7/22/2016 7122/2016 3.00 COMPZI CASING PUTS P Plck up first liner segment.Non ported 3.0 2,187.0 20:00 23:00 • bull nose,54 joints 2-3/8"slotted liner and shorty deployment sleeve.MU Coillrak tools.Stab on injector.Bump up and set depth. 7/22/2016 7/23/2016 1.00 COMPZI CASING RUNL P Begin RIH with first segment of liner to 2,167.0' 5,838.0 23:00 00:00midnight depth of5838ft. • • • 1 Page 13/17 Report Printed: 7/2812016 • • r„,f imastro Operations Summary(with Timelog Depths) rr &Welts 1L-18 . Co.1ocot'(vilips } Job: DRILLING SIDETRACK Rig: NABOBS CDJ2�AC . . • laKUepih EndDepint � d.til : I. Effli • Opecakon - " b Ka) • �Caderffl 5,838.0 10,951.0 • 812 1 6 E12 Time Mx Or p�6 Continue running in the hole with t e 0012016 03:0!2018 3.00 COMPZ1 first segment of liner,NP bull nose,64 00:00 03:00 Joints 2-3/8"SLI Slotted Liner,and shorty deployment sleeve. Poor hole conditions at 8215 ft. Reciprocate liner working through tight hale to 9700 R. Continue RIM with liner,SOW a 6-7 Kibs. +3ft correction atthe flag.Liner set down at 10961 It.PUH and retag bottom 3 times at the same depth.Will tie in on the way out of the hole to confirm lIner top depth. Bring up pumps and release liner with 3800 psi.PUN and confirm free. TRIP POOH w liner rune ng tools.Pant 10,951.0 55.5 05:3 05:30 012016 2016 2.50 COMM TRIP flags at 6300 and 7700 ft. 03:00Relog HRZ to confirm liner top depth o18813 ft. Conthue out of the hole. - 55.5 55.5 OWFF -Monitor we I or flow,no flow. 7123/2016 712912016 O.bO COMPZ1Sial . lail 0.0 7230312016 7 76/2312018 00 AD 7!/2NM PULD PJSM.W BNA#13 1. COMPZ10.0 957.2 06:00 07:00 PUTtt PJSM.P NU upper assembly,13 7123/20162016 3.00 COMP 1 23 Its slotted,shorty deployment • 07:00 1 10:0:00 � sleeve.MU BHA#14. Rill wl Ilner assembly, 9e-in EOP ag 957.2 8,812.0 10:00 016 12:157/23 2416 2.25 COMPZ1 CASING RUNL far+8.5'correction,continue in hole to 10:00 set depth,lag @ 8,812',PUW'40K, RBIH,stack 3K down,release from In liner,TOL @ 7,900'.PUW=34K.PUH, reset depth. 57.5 1,75 COMPZ1 CASING POOH for OH anchored billet,fie�n to 8,812.0 72:3/2016 71 0/2018 HRZ to confirm top of liner depth,+1' 12:15 14:00 correction.POOH. no flow.well for flow, - 57.5 . 57.5 7!2312016 7/23/2016 0.50 CO PZ1 CASINO OWFF Monitor ' 57.5 D-D 14:00 14:30 POLO PJSM.LD BHA#14 7/23/2016 7/23/2016 0.76 COMM CASING 1 :150.0 14:30 PUT© PJSM.PI/MU OH anchor billet all 72312016 7/23/2016 1.00 PROD2 STK aJSM.P: M one Jia slotted liner,OH 15:16 16:15 anchored billet.MU BHA#15. 113.4 7,898.0 16:15 RIM wl O anchored billet assembly, 016 7123 2016 2.25 PROD2 STK tie-in to the HRZ for a+8.5 ft 16:15 3 8::330 correction.Close EDC,weight check, PUW=36 Kibs.RIH to set depth,tag top of liner at 7898 ft.Bring up pumps, set anchors with 4200 psi.Single stip oriented 3D°LOHS. TRIP i'PO•H with running tools. 7,898.0 61.0 7 016 712312016 • 1.50 PROD2 � 7118 61.0 20:00 61.0- :30 OWFF 1 Flow chec well et s :ce.Static 7/23/2016 712312016 0.50 PROD2 61.0 0.0 2/231 7/230 NM PULD P Lay down BHA#16.Remove UQC 7/2312016 71232Q 8 .00 PR'D2 checks. 0.0 0-0 20:30 71:30 WHDBOP BO..E P RU and siertbiwkly BOP test. 21:3071312016 712A12016 2.50 PROD2 Witness waived by Chuck Shieve. 00:00 Test BOPE per checklist and procedures. Report Printed: 7128/2016 - -_______-_.:_:::.--. Page 14137 • s • Miffing Operations Summary(with Timelog Depths) r-`i a Vireas 1L-18 c.ctiocoPhili ps 1 ' Rig: NABORS GDR2-AC Job: DRILLING SIDETRACK Time:Log Stolt Depth Sled Ykne. .End lime ' nur Phase Op Code. , Ae11W Cade Ilene 13-1-X . 'Operation " • 1lj( End 0:.lh(Ilei) 7/24/20 6 7/24/2016 0.25 PROD2 WHDBOP BOPE Continue 8 weekly testing of ROPE r-0 0.0 00:00 06:15 per procedure.BOPE test complete, no failures. 7/24/2016 7/24/2016 2.00 PROD2 WHDBOP rease stat and choke manifold. 0:0 0.0 08:15 08:16 Maintenance on Injector&top drive. 7124/2016 7124/2016 4.75 PROD2 STK CTOP Cul 18'coil,removing two ata spots, 0.0 110 08:15 13:00 test E-Line.Stall coil connector,pull test to 35K,install UQC,test line. Pressure test 4.200 psi.MU nozzle, swap reel back to KWF. 7/2412016 7/24/2016 1.40 PROD2 STK PULD PJSil.MU BHA/116,check pack-0 s, 0.0 725 13:00 14:24 surface test. 7 2• 016 7/24/2018 4.10 PROD2 TK TRIP P RIH w drilling assembly:0.7 A 0 72.5 7,846,0 14:24 18:30 motor&RB HCC bit,tie-in for+9' correction,continue In hole,Weight check.35 Klbs.Finish rolling hole to FloPro drilling fluid.Dry tag billet at 7848 8. 7/2412016 7/24 2016 3.50 PROD2 STK KOST Begin time drilling off of blifef per 7,846.0 7,881-0 18:30 22:00procedure.P11end restart at 7848 ft after losing pump pressure.Drill oft billet and rathole to 7881 ft.Dry drift dean. 7/24/2016 7/25/2016 ' 2.00 PROD2 D•LL DRLG ontinue. [lag ahead,pumping 1.6 7,881.0 8,036.0 22:00 00:00 bpm at 4160 psi.CTW=11.5 Klbs, WOO=1.8 Klbs,BHP=4000 psi,FS • 410 psi 7125/2016 7126/2016 .25 PROD2 DRILL DRLG . P Continue drilling ahead,pumping 1.8 8,038.0 8,165.0 00:00 01;15 hpm at4200 psi.CTW=10.5 Klbs, WOO o 1.8 Klbs,BHP=3820 psi, - 7125/26 8 7/25/2016 0.75 PROD2 +RILL DRLG T PUH and troubleshoot survey.Survey 6,165.0 B. .5.0 01:15 02:00 out of spec due to magnetic , interference.Survey cleaned up over time.RBIH. 7125/2018 7/25/2016 1.25 PROD2 DRILL DRLG P Continue drilling ahead,pumpIng 1.6 8,165.0 8,240.0 02:00 03:15 bpm at 4105 psi.CTW=10.5 Klbs, W OB=1.8Kills,BHP=3800 psi, 7/25/2016 7/25/2016 1.85 PROD2 DRILL WPM' P Pull wiper trip. Tight hole et 7606 It. 8,240.0 8,240.0 03:15 05:06Continuing to work tight hole on wiper trip,steady cuttings returns across shaker,RBIH. 7/25/2016 7/25 2016 4.35 PROD2 DRILL DRLG Cont.no drilling ahead,pumping 1.6 8,240.0 8,640.0 05:06 09:27 bpm at 4070 psi.CTW-10.9 Klbs, WOO=1.7 Klbs,BHP=3825 psi, ROP=100.Continue to battle magnetic interference,call Sperry to correct • surveys,gat OK from town to continue drilling. 7/25/2016 7/25/2016 2.00 PROD2 DRILL ^ WPRT Wiper to 7,620',PUW-36K,RBIH. 8,640.0 8,540.0 09:27 11:27 Town questioning surveys.PUH,re- survey,send surveys to town.High magnetic interference,. 7/25/2016 7/25/2016 3.35 PROD2 DRILL DRLG Continue drilling ahead,pumping 1.58 8,540.0 8,840.0 11:27 14:48 bpm at 4075 psi.CTW=10.2 Klbs, WOB=1.6 Klbs,BHP=3830 psf, ' ROP=96. 7/25/2016 7/2,6/2016 1.50 PR.D2 DRILL WPRT P Wiper forte-in,PUW=35x,make jog 8,840.0 8,840.0 14:48 16:18 before EOB,tight spot(t4 7;607',make 200'.Jog,no Issue.Tie-in for+6.6' correction.RO1H,clean, Page 15117 Report Printed: 7/2B12016 01111 • - • Operations Summary(with Timelog Depths) 1L-18 C'-uucoPlliiips i . Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK MIS 1„09 -- - _ , • - __ startoegt!. KB End Depot(MK. Sart Time Lii i lime - Ow(hi) ' Phele OP Cade .Agility Cede Tone P-T-x Operation (o �' 7!25/2016 7/25/2016 3.70 PROD2 DRILL DRLG P - Continue pm at e4,drilling 05 psiaCTW=ad,pO Kping 1.62 8,840.0' 9,130.0 16;18 20:00 b=1.5 Kibs,BHP=3,920 psi,ROP=90. .Decrease survey 9,130.0 9,130.0 20:012016 20:4!2076 0.75 PROD2 DRILL TRIP T PUH t ionsrom 45 ft to 30 ft,PUW=33 20:00 20:45 Kibs. . 7!2512016 7/26/2016 025 PROD2 DRILL DRLG P ROM.Pumping 1.66 bpm at4,020 9,130.0 9,140.0 psi.CTW=4.9 KIK W013 a 1.6 Klbs, 20:45 21:00 131-1P=3,920 psi,ROP=75. 7/25/2016 7/25/2016 0.50 PROD2 DRILL WPRT 1P PUH for planned wiper trip.PUW=339,140.07,4 0.0 - i Kibs. 21:00 21:30 KIbs. Clean trip.SOW=12 K1bs. 7,940.0 9,140.0 7/25/2016 7/2612016 0.50 PROD2 DRILL WPRT P 21:30 22:00 325.0 7/25/2016 7/26/2018 2.00"PROD2 'DRILL DRLG P '8080.Pumping 1.7 bpm at 4,070 psi. 9,140.0 9, 1 G1W=7.5 Kibs,WOB=1.8 Klbs,BHP 22 ;pp 00:00 =3,836 psi,ROP=80-100 fph. 'New mud at the bit at 9176 ft. Drilling ahead,Pumping 1.7 bpm at 9,325.0 9,392.0 002016 7/26/20161.00 PROD2 DRILL DRLG P 4,120 psi.CTWs5 Klbs decreasing to 00:000 01:00 negative weight,WOB=1.5 Klbs, BHP=3,830 psi,ROP=100 fph ' decreasing to 20 fph.. PUH for short wiper tohelp improve 9,392:0 9,280.0 7/26/20160/2012016 0.13 PROD2 DRILL WPRT P'' weight iransfer.80 01:00 01:07 r RBIH.Clean trip SO'9.5[(lbs. 9,290.0 9,392.6 7126/2018 7l26i201fi 0.13 PROD2 � DRILL WPRT I' 0107 09:15 712612016 7/26/2016 0.75 PROD2 DRILL DRLG P B� Pumping g 1.bpm OB pm.2 4,06 BHP 9,392.0 9,440.0 01:15 02:00 =3,895 psi.ROP=35. 7126/2016 7/26/2016 2.00 rPROD2 DRiLL 'WPRT P PUH for long wiper trip.PUW=97KIbs. 9.440.0 7,118.0 Tight halo at 8240 ft and 7505 ft.Pull 02:00 04:00 into tubing tail for mud friction factor ineesurement. _ 7/26/2016 7/26/2016 0.25 PROD2 DRILL CIRC P Circulate at 1.5 bpm holding 3700 psi 7,118.0 7,118.0 annular pressure. 04:00 04:15 Rate out=1.49 BPM , Density in=8,63 PPG Density out=8.68 PPG WHP=520 PSi RBIH.Tie-In RA tag for+3.5' X18.0 9,440.0 0 0/26/2016 0.76 1'0.002 DRILL WPRT" P correction,continue in hole,no issues. 044::112016 15 06:00 - 7/26/2016 7/26/2015 1.75 PROD2 DRILL DRLG P BOBO.Pumping 1.7 bpm at 4,080 psi_ 9,440.0 9,505.0 GTW=O Kibs,WOB=1.4 Kibs,8HP= 05:00 06:45 3,695 psi,ROP=60.PU GEO wiper, off target,wait on town_Town called TD.Pump 10 x 10 to/hi vis sweeps. , 712612016 7/26/2016 2.50 PROD2 DRILL WPRT P Chase sweep to swab max rate,log§ 9,505.0 72.0 7,750',continuo long wiper trip.Tag 08.45 09:15 up,reset counters. RBIH to lay in completion fluid,Log 72.0 9,340.0 0 /2612076 a_50 PROD2 DRILL TRIP P HRZfor+15'correction,PUW=32K, 099::1/2016 15 1 11:15 continue In hole.Saw 7,505'&8,256'. i L 9,3.10.0 72.0 11:4/2016 15:012018 3.25 PROD2 DRILL C`1RC P pi©ccomp alien fluid,paint EOP flags 11:45 15:00 (if!7,000'&6,100'.POOH. P Monitor well for flow,no flow. 72.0 72.0 7!2812016 712612016 0.50 PROD2 DRILL OWFF 15:00 16:30 i • Page 16/17 Report Printed: 7128/2016 III 4111 I. ells Operations Summary(with Timelog Depths) :� 1L-18 C«r-ocoFlztiirs Rig: NABOBS CDR2-AC Job: DRILLING SIDETRACK trfit'pLog sort tom' ,`�TM . End Time .Ger(hr) Male Oil cede Antahy bode TM p-T X - Operation - (51<8). End mph g1K13) 7/26/2016 7/26/2016 1.00 PROD2 DRILL -PULD• P PJSM.LD BHA#16 72.0 , 0.0 16:30 16:30 0.0 0.0 7/26/2016 7/26/2016 0.50 COMPZ2 CASING PUTB P Prep rig floorfor liner run. 16:30 17:00 7/2612016 7/26/2016 3.00 75OMPZ2 CASING PUTB P 1I ott MU Ll liner deploymentembsl eve .8 0.0 2,180.4 17:00 20:00 7/26/2016 7/26/2016 0.90 COMPZ2 CASING PULD P PJSMlyUBAU toHA#17lto All ek, liner surface 2.180.4 2,224.6 20:00 20:54 assembtest. . 7/26/2016 7/26/2016 ' 2,00 COMPZ2 CASING RUNL P RIH with BHA#17,tie In at Bag for 2,224.6 8,730.0 2064 22:54 plus 5 ft correction,PUW 44k, continue RIH,Stack 31 7,535 ft,PU 40k,continue RIH. 7/2612016 7/2712016 ' 1.10 COMPZ2 CASING RUNL P 8,730 fl.Slacking,reciprocate liner 8,730.0 9,335,0 22:54 00:00 working through tight hole lo 9,335 ft. 7127/2016 7/27/2016 . 0.15 COMPZ2 CASING RUNL P At�eas depth, PLLf ne 47k, RBlH t 9,336 ft, 9,335set .0 7,155 -0 00:00 00:09 re- counters. - 7127/2016 -7127/2016 020 COMPZ2 -CASING -CLOG P PUH to 7,020 ft,log HRZ for plus 5.5 ft 7,155.0 7,160.0 00-09 00:21 correclion,bottom of liner at 9,340 ft, top of liner at 7,16011 corrected. 7/21/2016 7/27/2016 0.75 COMM CASING DISP P DIsplace out KWF to seawater.PJSM- 7,160.0 7,130.0 00:21 01:06 MIRU LRS. 7127/2015 7/27/2016 1.00 COMPZ2 CASING DISP P - POOH while pumping seawater.LRS ! 7,130.0 2,500.0- 01:06 02:06PT Linos and equipment,pump 30 bbl diesel,RDMO IRS. 7/27/2016 7)27/2016 1.15 DEMOB WHDBOP FRZP Pomp P freeze protect from-2,500'to, 2,500.0 94.2 02:06 03:15 b 44,2 0.0 H 7/27/2016 7/27/2016 2.50 DEMOB WHDI3OP PULL) P PJSM.-PUDsBppull#17,LD liner neplace • 03:15. 05:45 coil,flush lines. 7/2• 7/2016 7/27/2016 ' 1.50 DEMOB WHDBOP MPSP P Bring in BPV equipment,PJSM,RU 0.0 0.0 05:46 07:15 BPV equipment,lubricate In BPV,lest from below,RD,oft load BPV equipment. 7/2712016 7127/2016 425 DEMOB WHDBOP 'R(JRD P TBlowc down surface pits.line. Complete RD 0.0 0-01 che ff 07:15 11:30 t � 7/2712018 7/27/2016 0.60 DEMOB WHDBOP NUND P methanol,BOP O stack, ta act dade tree ebolls torque,ith 0.0 0.0 11:30 12:00 found 5 to be less than tight,30 minutes to tighten. Rig released:C51 12.00 on 07/27/16 I Page 17/17 Report Printed: 7/28/2046 � � Loti-035 RECEIVED 2T,1 WELL LOG TRANSMITTAL#903259662 * ors; To: Alaska Oil and Gas Conservation Comm. May 11, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA L GGED 5'12o,G Anchorage, Alaska 99501 K BENDER RE: Perforation Record: 1L-18 Run Date: 4/20/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-18 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-22145-00 Perforation Record (Field Print) 1 color log 50-029-22145-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Chris Gullett 6900 Arctic Blvd. SCANNED Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: 'DAL-#..4, 6-e/1-eat OF Tit • g y// 4' THE STATE Alaska Oil and Gas OfLASI�; CommissionConservation Commission A � Sf 333 West Seventh Avenue - GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 (4'A SSP Fax: 907.276.7542 www.aogcc.alaska.gov Ron Phillips CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 � � .t �� i Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1L-18 Permit to Drill Number: 191-035 Sundry Number: 316-216 Dear Mr. Phillips: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, / Cathy . Foerster Chair DATED this I3 day of April, 2016. RBDMS ICU APR 1 4 2016 • • RECEIVED • STATE OF ALASKA APR 0 4 2016 • ALASKA OIL AND GAS CONSERVATION COMMISSION p-j-S d p 3//G APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations Q • Fracture Stimulate ❑ Repair Well Q . Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill E ' Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska Inc Exploratory ❑ Development ❑ 191-035' 3.Address: Stratigraphic ❑ Service Q, 6.API Number: PO Box 100360,Anchorage AK 99510 50-029-22145-00 . 7. If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? NA KRU 1L-18 - Will planned perforations require a spacing exception? Yes ❑ No El ✓ 9.Property Designation(Lease Number): 41-S 10.Field/Pool(s): ADL 25659, ALKK-2585 Kuparuk River Field/Kuparuk River Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 7800' . 6359' ' 7700' - 6285' • 2760 None 7626' Casing Length Size MD TVD Burst Collapse Conductor 122' 16" 122' 122' 1640 670 Surface 3991' 9-5/8" 4121' 3567' 3520 2020 Production 7659' 7" 7789' 6351' 4980 4320 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 7244'-7298',7442'-7464',. 5952'-5992',6097'-6113', 3-1/2" 9.3#,J-55 Tbg 7168'MD,5897'TVD 7540'-7550' , 6169'-6177' Packers and SSSV Type: Packer-Baker HB Retrievable Packer Packers and SSSV MD(ft)and TVD(ft): . 7116'MD and 5859'TVD SSSV-Camco TRDP-4A , 1799'MD and 1781'TVD 12.Attachments: Proposal Summary Q Wellbore schematic U 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development❑ Service ❑., 14.Estimated Date for 15.Well Status after proposed work: 4/18/2016 Commencing Operations: OIL ❑ WINJ El WDSPL ❑ Suspended ❑� `. 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Ron Phillips @ 265-6312 Email Ron.L.Phillips(a�conocophillips.com Printed Name Ron P . s Title CTD Engineer ). VI//;49/4 Signature hone:26 6312 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 1 _ \L R. Plug Integrity ❑ BOP Test Er Mechanical Integrity Test ❑ Location Clearance ❑ Other: 50 P 1-e$f i-0 3 SU 0 � f}Yl✓l v l a r- ��r c-t,'e v,T, , !— t� Z Sv c j�S'� 2 C e ) A/ r-e•rhu /'z plvl pi4etvl� rnI wpprov{d /2cr a � �✓tc � 5, /� L Post Initial Injection MIT Req'd? Yes ❑ No Spacing Exception Required? Yes ❑ No LA Subsequent Form Required: /D ^ 0.7"-' R.BDMS V APR 1 4 2016 APPROVED BY Approved by: attil P SSIONER THE COMMISSION Date: 4..—/3—/�j R O nthsf+ mj e f f to SubmitForm and Form 10-403 Revised 11/2015 p r d pl i s for 12 months from a ate of approval. Attachments in Duplicate V!'L 4/l2 M., „0, 1104 KRU 1 L-18 CTD Summary for Plugging Sundry (10-403) Summary of Operations: Well 1L-18 is a Kuparuk NC-sand injector equipped with 3W tubing and 7" production casing. The CTD sidetrack will utilize two laterals to target the A5 sands to the northwest and south of 1 L-18. Prior to CTD operations, the 3-1/2" tubing tail will be perforated and the D nipple at 7,133' MD will be milled out to a 2.80" ID. The existing NC-sand perfs will be squeezed with cement to provide a means to kick out of the 7" casing'ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A/C-sand perfs in this manner. Following the cement squeeze Nabors CDR2-AC will drill a pilot hole to 7,415' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 7,385' MD. Both laterals will be completed with 2-3/8", slotted liner from TD with the las - - > Jinerr# e the 3 1/2" tubingrtaiL Using the maximum formation pressure in the area of 3,371 psi in 1 L-14, the maximum potential surface pressure, assuming a gas gradient of 0.1 psi/ft, would be 2,760 psi. CTD Drill and Complete 1L-18A Sidetrack: August 2016 Pre-CTD Work 1. RU Slickline: dummy off gas lift mandrels and pressure test. 2. RU E-line: Shoot 2' of holes in the 3W tubing tail at 7128' MD. 3. RU Pumping Unit: perform injectivity test down the tubing. 4. RU Service Coil: Mill out D nipple and cement squeeze the NC-sand perforations up to the perforations in the tubing tail. 5. RU Slickline: Tag top of cement and log. j1i i S 6. Prep site for Nabors CDR2-AC and set BPV. Riq Work 1. MIRU Nabors CDR2-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 1L-18A Sidetrack (A5 sand - Northwest) /'1-t 7)c a. Drill 2.80" high-side pilot hole through cement to 7,415' MD b. Caliper pilot hole c. Set top of whipstock at 7,385' MD d. Mill 2.80"window at 7,385' MD. e. Drill 3" bi-center lateral to TD of 11,400' MD. f. Run 2%" slotted liner with an aluminum billet from TD up to 8,000' MD. 3. 1L-18AL1 Lateral (A5 sand - South) a. Kick off of the aluminum billet at 8,000' MD. b. Drill 3" bi-center lateral to TD of 10,200' MD. c. Run 2%" slotted liner with deployment sleeve from TD up to 7,157' MD. AJ e VI' 4. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD2-AC. /�I D Post-Riq Work 1. Pull BPV 2. Obtain SBHP 3. Pre-produce for less than 30 days 4. Return to injection ,r4 y./Dr //y,er kci into 74 Coe G ur. /4e 'reel (a o CD�i/,%ter/ ��'�' �0� T��I ve l ��C lv/ f fa10. I e , / b�� D f rot/flit, ,erisri . well torr ad 1'�j✓s 1/V'11 he (aril( I ;'i. the gfe4 O 1ex/k/T Page 1 of 1 4/1/2016 KUP INJ • 1 L-18 Conoc. 'hillips m Well Attributes Max Angle&MD TD Alaska,Inc. Wellbore APIIUWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) • Connc thiIpa 500292214500 KUPARUK RIVER UNIT INJ 44.79 3,200.00 7,800.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) `Rig Release Date 1L-19.5/12/2015 327:48 PM SSSV:TRDP Last WO: 42.99 3/24/1991 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 7,487.0 5/8/2015 Rev Reason:TAG,MANDREL ORIENTATION hipshkf 5/12/2015 Casing Strings J Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len(I...Grade Top Thread :fatCONDUCTOR 16 15.062 43.0 122.0 122.0 62.50 H-40 WELDED HANGER;37.8 Casing Description OD(in) 'ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...'Wt/Len(I...Grade Top Thread SURFACE 95/8 8.921 42.0 4,120.6 3,566.5 36.00 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread PRODUCTION 7 6276 35.4 7,788.6 6,350.5 26.00 J-55 BTC-MOD Tubing Strings •: • •.•• 4 • . ., •1 )taut SYea1W Tubing Description String Me...ID(in) Top(ftKB) Set Depth(ft...Set Depth(TVD)(...Wt(lb/ft) Grade Top Connection TUBING 3 1/2 2.992 37.9 7,167.6 5,896.3 9.30 J-55 EUE8rdABMOD Completion Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) -A-Ad CONDUCTOR;43.0-122.0- I�'�'�"'V�' 37.9 37.9 0.03 HANGER FMC GEN IV TUBING HANGER 3.500 1,799.1 1,781.2 20.09 SAFETY VLV CAMCO TRDP-4A SAFETY VALVE 2.812 7,102.6 5,848.9 43.07 PBR BAKER 10'STROKE PBR 3.000 � _. 7,116.3 5,858.9 43.11 PACKER BAKER HB RETRIEVABLE PACKER 3.500 SAFETY SILO:1.799.1 . - 7,132.7 5,870.8 43.15 NIPPLE CAMCO D NIPPLE NO GO 2.750 7,166.7 5,895.6 43.24 SOS BAKER SHEAR OUT SUB 2.992 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) Top(ND) Top Inc) Top(ftKB) (ftKB) (°) Des Com Run Date ID(in) 7,626.0 6,232.1 43.09 FISH 1.5"OV w/RK Latch Lost Downhole 10/7/1991 10/7/1991 GAS LIFT,1.938 5 Perforations&Slots Shot Dens Top(ND) Atm(ND) Dens Top(ftKB) Bbn(ftKB) (ftKB) (BRA) Zone Date t) Type Com 7244.0 7,298.0° 5,951.9 5,991.5 C-4,1L-18 8/13/1991 6.0 APERF 2 1/8"EnerJet III;0 deg. ph 7,442.0 7,464.0 6,097.2 6,113.4 A-5,1L-18 6/12/1991 4.0 IPERF 4.5"HSD Csg Gun;180 deg.ph 7,540.0 7,550.0 6,169.2 6,176.5 A-4,1L-18 6/12/1991 4.0 IPERF 41/2"HSD Csg Gun; 180 deg.phasing; SURFACE;42.0.4,120.6- Covered w/fill Mandrel Inserts St EL Top(TVD) Valve Latch Port Size TRO Run Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com GASLIFT;7,045.7 1,938.5 1,911.5 McMurry FMHO 1 GAS LIFT DMY 'BK2 0.000 0.0 924/1991 1:30 7,045.7 5,807.3 MACCO SPM-2 1 1/2 GAS LIFT DMY RK 0.000 0.0 1/25/1992 5:00 1 Notes:General&Safety 1- 11.-- End Date Annotation 10/4/2010 NOTE:View Schematic w/Alaska Schemahc9.0 PBR;7,102.6 PACKER;7,17fi.3 NIPPLE;7,1327 SOS;7,166.7 APERF;7,244.0-7,296.0 .--- IPERF;7.442.0-7.464.0 IPERF;7,540.0.7,560.0 J FISH;7,626.0 PRODUCTION;35.4-7.788.1 • • S 1 L-18 Proposed CTD Schematic Modified by RLP 4-1-16 3-1/2"Camco TRDP-4A SSSV @ 1799'MD(2.812'min ID) 16"62#H-40 shoe H @ 122'MD 3-1/2"9.3#J-55 EUE 8rd Tubing to surface 9-5/8"36#J-55 shoe @ 4121'MD 3-1/2"McMurry gas lift mandrel @ 1939' 3-1/2"Macco gas lift mandrel @ 7046' Baker 3-1/2"PBR @ 7102'MD(3.0"ID) Baker HB packer @ 7116'MD(3.5"ID) 3-1/2"Camco D landing nipple @ 7133"MD(2.75"min ID,No-Go) '= Baker SOS @ 7167'MD 3-1/2"tubing tail @ 7162'PDC C-sand perfs 7244'-7298'MD 1L-18AL1 wp02(South) TD Q 10,200'MD KOP@7385'MD N' TD �Lat#2 1L-18Awpo3(NVu) TD @ 11,400'MD Liner Billet @ 8000'MD A-sand perfs 7442'-7464'MD I Lat#1 7540'-7550'MD EEEEili 7"26#J-55 shoe @ 7789'MD • S Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task ,Rest nsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box /Geolost in the upper left corner of Form 10-403 is checked. If the "Abandon" or \� "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed (Geologist, work) the initial reviewer will cross out that erroneous entry and initial ' -_then ?-c ) it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) f'CV 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July,the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been Geologist handled properly. At this same time, they will also review the list of suspended wells for accuracy. 191- 03$ 25'62% WELL LOG TRANSMITTAL DATA LOGGED (.i%/2015 K BENDER To: Alaska Oil and Gas Conservation Comm. May 18, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED MAY 212015 RE: Multi Finger Caliper(MFC) : 1L-18 AoGcc Run Date: 5/10/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-18 Digital Data(LAS), Digital Log file, Casing Inspection Report, 3D Viewer 1 CD Rom 50-029-22145-00 6CANNEU •iUN 1 2 2015 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well History File PAGES TO DELETE RESCAN n Color items - Pages: n Grayscale, halftones, pictures, graphs, charts- Pages: n Poor Quality Original - Pages: n Other- Pages: DIGITAL DATA Diskettes, No. n Other, No/Type OVERSIZED .E3' COMMENTS: Logs.of various kinds . Other Scanned by: Dianna Vincent Nathan Lowell Complete TO RE-SCAN Notes: · Re-Scanned by: Beverly Dianna Vincent Nathan Lowell Date: Is~ • • ConocoPhilli s p Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510 -0360 � Ste" e9 June 27, 2011 t �. 1\1 Commissioner Dan Seamount f � � � � ion Alaska Oil 7th Gas Commission r� CaSI. �Ri,ir015S 333 West 7 Avenue, Suite 100 N ,1,s ` Anchorage, AK 99501 Commissioner Dan Seamount: Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10 -404, Report of Sundry Operations. The cement was pumped on 3/21, 5/9, 5/23 and 5/24, 2011. The corrosion inhibitor /sealant was pumped 6/18, 6/19, 6/20 and 6/21, 2011. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Martin Walters at 907 - 659 -7043, if you have any questions. Sincerely, MJ L veland ConocoPhillips Well Integrity Projects Supervisor • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Kuparuk Field Date 06/27/2011 1A,1B,1E,1L,1Q,1Y PAD Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name API # PTD # cement pumped cement date inhibitor sealant date ft bbls ft gal 1A -03 , 50029206150000 1810880 16" N/A 23" WA 1.7 6/20/2011 1A -04A 50029206210100 2001940 18" _ N/A 23" N/A 2.5 6/20/2011 1A -16RD 50029207130100 1820310 SF N/A 22" N/A 5 6/182011 1B-03 , 50029205880000 ' 1810560 SF N/A 23" N/A 5 6/21/2011 1B-04 50029205950000 1810650 18" N/A 18" N/A 2.5 6/21/2011 1B-05 50029202370000 , 1770010 31" 6.40 2'9" 5124/2011 6 , 6/212011 1B -07 50029206160000 1810890 72" 1.00 22" 5/9/2011 2.5 6/21/2011 1B -08A 50029206350100 1971120 ' 18'8" N/A 29" N/A 4.5 6/21/2011 1B-09 50029206550000 1811340 _ SF _ N/A 23" N/A 5 6/20/2011 1B-10 50029206560000 1811350 SF N/A 23" N/A 6 6/21/2011 1B-12 50029223650000 1930610 13'4" 2.00 24" 5/9/2011 6 6/21/2011 1B -101 50029231730000 2031330 _ 3" _ N/A 22" N/A 1.7 6/21/2011 1B-102 50029231670000 , 2031220 11'2" 0.60 36" 5/9/2011 1.7 6/21/2011 1E -05 50029204790000 1800580 19" N/A 19" N/A 1.7 6/19/2011 1E-22 50029208840000 1822140 14" T 1.75 17" 3/21/2011 1.7 6/19/2011 1E-23 50029208580000 1821840 58' 10.75 2'5" 5/23/2011 3.4 ' 6/19/2011 1E-30 50029208140000 _ 1821390 15'5" 1.75 _ 16" 3/21/2011 2.5 6/19/2011 1E -105 50029232430000 2050060 20" N/A 20" N/A 6 6/19/2011 1L -16 50029212020000 1841810 14'9" _ 2.00 35" 5/23/2011 6 6/20/2011 re )t, 11.-18 50029221450000 1910350 SF N/A ■ 18" N/A 2.5 6/19/2011 1Q-24 50029225840000 1951210 7'8" 1.00 l 12" 5/9/2011 5 6/18/2011 1Y-02 50029209410000 1830590 40'10" 5.00 41" 5/9/2011 8.5 6/18/2011 • 0 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. October 13, 2009 Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Injection Profile: 1L -18 Run Date: 7/23/2009 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 1L -18 Digital Data in LAS format, Digital Log Image file, Interpretation Report 1 CD Rom 50- 029 - 22145 -00 Injection Profile Log 1 Color Log 50- 029 - 22145 -00 ,�MNE . DE A, t� 200S PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Q 3..s Attn: Rafael Barreto Urt f 6900 Arctic Blvd. Anchorage, Alaska 99518 1 409 9 Office: 907 - 273 -3527 Fax: 907 - 273 -3535 rafael.barreto@,l alliburton.com Signed: Date: • To: Jim Regg / P.I. Supervisor r~ ~~~ ~"t ~~'~~~ FROM: Jeff Jones Petroleum Inspector State ®f Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, June 11, 2008 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC 1L-18 KUPARUK RI V UNIT 1 L- 18 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.t. Suprv C.1-Bn Comm Well Name: KUPARUK RN UNIT 1L-18 API Well Number: 50-029-2214s-00-00 Inspector Name' Jeff Jones Insp Num: mitJJ080610114213 permit Number: 191-035-0 ~ Inspection Date: 6/1/2008 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well IL-Ia TYPe Inj. W ~ TVD -- -- -s859 IA 1040 I 2540 2490 2490 ~ __~ P.T. i I9losso TypeTest ~ SPT Test psi 1 ~ isoo '~pA s9o ~ Sao ~ Sao --Sao-_._T -_- -- ----- - --~-----=- - - --- I _ _ - = -- -G -- Interval aYRrsT p~ _ P ~ _ Tubing ~ 1840 i I sao I sas ! aas 1 NOteS' 2.1 BBLS diesel pumped; no exceptions no ted. _ _ _ ~~ JUL ~ ~ 2008 Wednesday,.lune 11, 2008 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test !~P- b{ \h{04 Email to:Tom_Maunder@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us; and Jim_Regg@admin.state.a OPERATOR: ConocoPhillips Alaska Inc. FIELD I UNIT I PAD: KRU 1 L DATE: 06/14/04 OPERATOR REP: Brake 1 Rogers AOGCC REP: Waived Packer Depth Pretest Initial 15 Min. 30 Min. well 1L-01 I Type Inj I N 1 T.V.D. I 5762 1 Tubing I 8°1 8°1 8°1 8°1 Interval I 4 P.1.D. 1841730 Type Test P Test psi 1500 Casing 240 1740 1720 1720 P/F P Notes: well 1L-03A Type Inj I S I 1.V.D. 1 4456 1 Tubing 1 255°1 25501 255°1 255011nterval 4 P.1.D. 1990370 Type Test P Test psi 1500 Casing 450 1800 1760 1760 P/F P Notes: well11L-05 I Type Inj I G 1 T.V.D. 1 5826 1 Tubing 1 354°1 354°1 354°1 354°1 Interval I 4 P.T.D. 1841230 Type Test P Test psi 1500 Casing 700 1740 1710 1700 P/F P Notes: Well 1 L-07 1 Type Inj I S I T.V. D. I 5738 I Tubing I 255°1 255°1 255°1 255°1 Interval I 4 P.1.D. 1841450 Type Test P Test psi 1500 Casing 560 1740 1740 1740 P/F P Notes: we1l11L-10 I Type Inj I S I 1.V.D. I 5866 1 Tubing 1 179°1 179°1 179°1 179°1 Interval I 4 P.T.D. 1900350 Type Test P Test psi 1500 Casing 1240 2500 2450 2450 P/F P Notes: we1l11L-14 I Type Inj I G 1 T.V. D. 1 5768 1 Tubing I 28°°1 28°°1 28°°1 280°1 Interval I 4 P.T.D. 1910100 Type Test P Test psi 1500 Casing 650 1700 1680 1680 P/F P Notes: we1l11L-16 1 Type Inj I N 1 1.V.D. 1 5794 I Tubing 1 9°1 9°1 9°1 9°1 Interval I 4 P.T.D. 1841810 Type Test P Test psi 1500 Casing 125 1625 1620 1620 P/F P Notes: we1l11L-17 Type Inj I G 1 1.V.D. 1 5868 Tubing I 326°1 32601 33001 33°°1 Interval I 4 P.1.D. 1910430 Type Test P Test psi 1500 Casing 725 1725 1720 1720 P/F P Notes: well 1L-18 Typelnj I S 1 1.V.D. 1 5859 I Tubing I 189°1 189°1 189°1 189°1 Interval I 4 P.1.D. 1910350 Type Test P Test psi 1500 Casing 470 2600 2550 2540 P/F P Notes: well 1 L-21 DPN Type Inj I S 1 1.V.D. I 5769 I Tubing 229°1 229°1 22901 229°1 Interval I 4 P.1.D. 1910060 Type Test P Test psi 1500 Casing 60 1760 1760 1760 P/F P Notes: well 1 L-22 I Type Inj I S I T.V. D. I 5909 I Tubing I 23°°1 23°°1 23001 23001 Interval I 4 P.T.D. 1901640 Type Test P Test psi 1500 Casing 60 1760 1750 1750 P/F P Notes: we1l11L-25 I Type Inj 1 N I T.V.D. I 5884 I Tubing 1 125°1 125°1 12501 125011nterval 4 P.1.D. 1910700 Type Test P Test psi 1500 Casing 410 1760 1720 1720 P/F P Notes: MIT Report Form Revised: 05/19/02 MIT KRU 1 L 06-14-04.xls 6/15/2004 STATE OF ALASKA !~ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS '1. Operations Pedormed: ' Abandon [~ Suspend [] Operation Shutdown ~-] Perforate [] Variance · . Alter CaSing [] R~pai[ Weft ~ ' Plug Perf°ra. ti°ns......'D"' S~im'ulaie.. . .'[~] . ' . Time. ... Extensioh.. "[~ Other r'~ Change ApproVed Program r-~ Prell .T'~bing [] Perforate N'~W Pool .~--'~ · Re-enter Suspended.Well [-~ 2. Operator Name: .'..4.'.Curredt Well Status: .i '.' '-' '""'?- "'; r-]Expl~)r~t°ry .' 5. Permit to Ddll Number: ConocoPhillips Alaska, Inc. ' D;;e;ol~;n, ":'~-~ 191-035, :3. Address: 'Stratigm?ic "~" .... ~e~vice r~ 6. APl Number: ., P. O. Box 100360 50-029-22145-00 7. KB Elevation (ft): 9. Well Name and Number: RKB 130' 1L-18 8. Property Designation: 10. Field/Pool(s): Kuparuk River Unit Kuparuk Oil Pool 11. Present Well Condition Summary: Total Depth measured 7800' feet true vertical 6359' feet Plugs (measured) Effective Depth measured 7700 feet Junk (measured) true vertical 6285 feet Casing Length Size MD TVD Burst Collapse Structural CONDUCTOR 122' 16" 122' 122' SUR. CASING 3991' 9-5/8" 4121' 3567' PROD. CASING 7659' 7" 7789' 6351' Perforation depth: Measured depth: 7244- 7550 ti~'~;~ true vertical depth: 5952- 6177 ~!~[.I~' {!9.. i,~i ~..:~t~ · ' Tubing (size, grade, and measured depth) 3-1/2" J-55, 7168' MD. ~i~'~[ti'i.~l~i~i~,~:'~il li'~il ,i~='.~ '~':::''~ "' '~i'.i'i~!~i?,!:L. , ,~ ~,., ...., J, Packers & SSSV (type & measured depth) pkr= BAKER 'HB' pkr=- 7116' SSSV= SSSV SSSV= 1799' ".. ?!2'i. Sti.m~ilation'0r:.cement ·squeeze $'d~hmary:..=; =. '.. =: :: .'~:' ' · .: '..'.." ;:. ' · :..?.'! :.? ~: :. i'.= ....;. ::= '.==.. '. :: ::. '.. ? '..= .':.'¥.".'i:..:: ...~ ;.' .. · ..:'.: ' '.'.i: ;'. :' ...." '.?'~ =...:.." · '~.' :.' '......'. · ':...... '... =~ ..';; '=... ;=' :'.'1=.. ;:"".' .=" '' '.' :' =. '?'=.'= ",.' ..';.' .'=......i..' '. ':. =' · i . ' ', "'.: '".. ' '..''~.." ':':'= ' · !'= ' '"'". ".' '"':." .. · '.=' ":"''=..' .... .": ' ' '" ' · '" '. :: .?i:.'":' !:.i "i.=. ="i=...: .'= '....: :=..'. :i' '.:..': =""::" !; i. ..... :; :i'. ;:'i:. .i ".:. '. !i: .' .."' :::= .' :; :'.:~:; ..T~.tn~[. d.'es~ip."ti~'s='~i0~!~ihg i~'01U.~S ~S~.d ~n(~..iinai"~e~S,~:..:~;~ ..:: .:'" :=':. ::.: .i;.:.~ ii.;~· '..='. :.'~ 'i' :' .,.": ':? ":::. ":. ': ":: ":.'.. !: ..;' .':.~ .. :.: :~ .'" ;':: .. '.: .i;. :=:":.'.'. '.' :'..... :.'=....'. · '.: ::i3,:'='~:..'.:=. ?:.' ..'..: .:~ ?..?:i.i':...;/.~ .'". !'~'..i"i:! '=; :. '.' .:...:.: :.;'... .?. ..'./. '; ::...: R~p~&~si~ritati~e' Dai[y:Aver~'=P~dd~ti0n=.~. in]~tiori'D~ta: .'. ¥"..:'. i= =..' ..:'.i.'~:: .= :. i.... '~= ..;i: .... ' ... '. ',;..:=... '.i':;.'. "." ' . ' : .. '... ·; ' '.';...'. : ' ' '"~'." ' · .' ' · '. ' ' =' ' '' ' "' ~ ' ' ' :' ='=" ' '='" "" =" '"" '=' ......... "; .... ":: "';.."='=' "=' ' "' ' ....... ': '"' ' ' " '"' ' ........ ' ' :; ;':'i' ": '. ";=."' '" ." .... ":=~' .:'.:' = "" :' '" .... '= ' ' = '''= '::" "= .':.Oil,Bbl = ;.:'.~..' i.=!!1 "'..:...~'...%!;,~;;:.:'G~.~;M&f=..'-::::':.!',:~'.' ':;~'!!=: ::'::': ...='::i.wate~-Bbl .:.' ...:...: .:. '=. C~sin~' Pre, ssbre ·" Tubin,q'P~essbre ...:: :i ...Prior· t0':W~l'l bpe~:ati~)h .'..." '.i';;:!..'. =.:'. "'.' :i:i .';. :==: ... :;.....;=.' ';i=!'.' =. '.: iI. '...i:ii :ii ..:.;."...:'=..:' ::. ;:?. i;':~; :.'.' .;:=',! ..: .... ....: i':...;'.;. :.;= ::;;'..; r..'.';..=: ~'!~33~'~. :'=:. '~ ;.:.= .;.. ". "=i. =.... i'00'.'i' .:"..':'.i:., .', '::=:'.;' ?'.i."i 848 .' .' · .. '.Sq.b.'§e~i~t ;toi'0P:.~:i~iio'~ .: :?' '...' .'.. :... ,.:'..::=.= .:~:'. i.:":.=.'...: :: ': ::'. ' ..: i. ':;i: ": ..='. '.'.= ..."... :.~6~.8~:": ,.: .::,..?.:~. ': :~:=;= :=.;:. :i~:!':=.::::'.. :i ':~'::';.i'('.i= ..: .'.: '...:i.?. '.=: "....'.'.' · ...~'.o.b :..:!~. Att~Ch.m.'~'rit{. ;=i.' .:.!'i.:.:"':' i=:i?.... :;.::=~ .==:' : '"'::: ..:..'~":: :'....'.."= .'. '::':.:". '~:i = "15;'.wel!'Cl~s ~.ff~[.:p~6P0sed.:w~i~:". '. .... .'~" . ....'.....: :.=.:i :. :'. :: ' . ..; i=' ..... ~"= "' .. :.'.:~;~ '.: :.. · .." ..' "" ".'" ";;~ "i: .='"...' '. ~. :"':':'. '..'""~ =.. ' ." ~' . .. :' . · " .. "i .'.. ' ' · "' '=~= ~'" ·" '. ""'" ' ' ''=' .' '"" "=.'. '=.'. ':' .. '. :. :'" ' · '.~ ' . .:'. ' '. ' .. Copies of Logs arid S!Jryeys.run ... · ·.. .. :. :..i :/ . ... :.ExPl0~;atS~/.r-'] .=. :... ·Devel0pment".' ~ · Service ' [~".~'.....:'. .... '. ........' · .... · ; ..; . .. ...'."'": ...'. :~....= !..: ......=..'. '..........: ·: ;. .:..: · . ... . ................ ;... :' ' '.DailyRePott.bf.Wel!o~etati0ns'. "X ..... . ':I "'1'6:'~'eli ~i~t~;i~:~)'~0~s~a':~r~'i! :..'.. ":. '=''': '"'" .' ". " ". .. '. . . · . . · . · · 'i 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: I Contact Jeff Spencer__ @ 659:7226 .. .. 'Printed Name~~ Title Production Engineering Technician Signature~_~1~~ ~,~,~ ' Phone 6,59-7535 Date ,,, Form 10-40._4J~e,~i~ed~(~03 · SUBMIT IN DUPLICATE 1L-18 i!i DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 7130/20031C.ommenced WAG EOR Injection I I MEMORANDUM TO: Dan Seamount Commissioner THRU: Blair Wondzell P.I. Supervisor FROM: John CrisP: ,J~,~ ~_. Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: September 11,2000 SUBJECT: Mechanical Integrity Tests Phillips Alaska Inc. 1L Pad 16,17,18,21,22 Kuparuk River Unit Kuparuk River Field NON- CONFIDENTIAL 'WellI 1L-16 P;T.D.I 1841810 'NOtes: Well1 1L-17 P.T.D.I 1910430 Notes: WellI 1L-18 : P.T.D.I 1910350 Notes: WellI 1 L-21 P.T.D.I 1900540 Notes: Packer Depth Pretest Initial 15 Min. 30 Min. I Typelnj. I S I T.V.D. I 5800 I Tubingl 2650 )2650 I 2650 ] 2650 J lntervalI 4 T. YpetestI P I Testpsil 1450 I Casingl 490 ,I 1675 I 1630 I 1625 I P/F'I P- ITypelnj. l'S I T.V.D, I~ I~u~,,,I 2475 12478 12475 J2475 Ilntervall 4 Type testI P I Testpsil 14~8 ICasin~I 60o I 1550 I 1540 I 1520 I P/F I _P-~ Type,nj.I S I T.V.D. J5857 J Tubing I 2250 J 2250 I 2250 I 2250 J lnterVa,I 4. ITypetestJ .P ITestpsil 1464 I Casin'gl 5oo I 15s0 I 1560 I 1550I P/FIE I Type,nj.I S I T.V.D. I 5678 I Tubingl ii~=~ i~=~ I lntervaq 4! TYpetestIP ITestpsiI 1420 I Casin'gl 52O 1159011580 '1 15751 P/FIE' I 'we,,I 1L'22 I Type,ni.I N I T.V.D.I~¢~ I Tubingl 1300 I~=~ I,~=, I~=, l,nte~va,I 4 P.T.D.I 1901640 ITypetestI P ITestpsil 1481 I Casingl 52O 1159OI 158O11575i P/F I P' Notes: Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Test's Details No failures witnessed. Testing went well with no problems, encountered. Interval I= Initial Test 4= Four Year Cycle V= Required by Vadance W= Test dudng Workover O= Other (describe in notes) .I.T.'s performed: 5_ Attachments: Number of Failures: 0_. Total Time during tests: 2 hrs. CC: MIT report form 5/12/00 L.G. MIT KRU 1 Lb 9-11-00jc.xls 9/13/00 Alaska Oil Gas Canscr~,ation Cammissian 300i Porcupine Drive Anchorage, Alaska 99501-:3192 907-279-1 433 The following data is hereby acknowledged as being received: ?1-?~ 2 91-//~ ,Copy se~.to s~nd~r: Y~s ~ No ~ STATE ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown Pull tubing Alter casing Stimulate __ Plugging Perforate _ Repair well Other 2. Name of Operator ARCO Alaska, Inc, 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Z Exploratory _ Stratigraphic _ Service 4. Location of well at surface 507' FNL, 143' FEL, Sec. 31, T11N, R10E, UM At top of productive interVal 1410' FSL, 1091' FWL, Sec. 32, T11N, R10E, UM At effective depth 1137' FSL, 1238' FWL, Sec. 32, T11N, R10E, UM At total depth 1077' FSL, 1270' FWL, Sec. 32, T11N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical 7800' feet 6358' feet Plugs (measured) 6. Datum elevation (DF or KB) 13O' RKB 7. Unit or Property name Kuparuk River Unit 8. Well number 11,-1~ 9. Permit number/approval number 91-35 10. APl number 5~)-029-2114F~ ~ ~ ~,~) 11. Field/Pool Kuparuk River Oil Pool feet Effective depth: measured 7700' true vertical 6285' feet Junk (measured) feet Casing Length Structural Conductor 1 22' Surface 41 2 0' Intermediate Production 7 7 8 8' Liner Perforation depth: measured 7244'-7298', true vertical 5951 '-5991', Size Cemented 1 6" 235 Sx AS 9 5/8" 800 Sx PF Type E & 500 Sx Prem. 7" 250 Sx Class G 7442'-7464', 6097'-6113', Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55 set at 7172' Packers and SSSV (type and measured depth) SSSV: 7540'-7550' 6169'-6176' Camco TRDP-4A-SSSV, 1789', Packer: Baker HB, 7116' Measured depth 122' 4120' 7788' True vertical depth 122' 3566' 6349' RECEIVED 13. Stimulation or cement squeeze summary Convert well to water injection. Intervals treated (measured) N/A Treatment description including volumes used and final pressure N/A Alaska 0il & Gas Cons, Anchorag~ 14. Prior to well operation Subsequent to operation ReDresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure 100 130 900 1500 -0- 0 - 3200 750 Tubing Pressure 250 2150 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Water Injector X Oil _ Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~. Title -- Form 10-404 Rev 09/12/90 Date SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND CE~SERVATION COMMI,5,~ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing _ Repair well _ Change approved program X Operation Shutdown Re-enter suspended well Plugging _ Time extension Stimulate Pull tubing _ Variance _ Perforate _ Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 507' FNL, 143' FEL, Sec. 31, T11N, R10E, UM At top of productive interval 1410' FSL, 1091' FWL, Sec. 32, T11N, R10E, UM At effective depth 1137' FSL, 1238' FWL, Sec.32, T11N, R10E, UM At total depth 1077' FSL, 1270' FWL, Sec. 32, T11N, R10E, UM 12. Present well condition summary Total Depth: measured true vertical Effective depth: 6. Datum elevation (DF or KB) 130' RKB 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1L-1~ 9. Permit number 91 -35 10. APl number 50-029-22145 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 7800' feet Plugs (measured) 6358' feet None measured 7700' feet Junk (measured) true vertical 628 5' feet None Length Size Cemented 1 2 2' 1 6" 235 Sx AS 41 2 0' 9 5/8" 800 Sx PF Type E & 500 Sx Prem. 77 8 8' 7" 250 Sx Class G Measured depth True vertical depth 122' 122' 4120' 3566' 7788' 6349' measured 7244'-7298' ,7442'-7464',7540'-7550' true vertical 5951'-5991', 6097'-6113', 6169'-6176' Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55 set at 7172' Packers and SSSV (type and measured depth) SSSV: Camco TRDP-4A-SSSV, 1789', Packer: Baker HB, 7116' 13. Attachments Description summary of proposal _ Detailed operation program _ Convert well from oil producer to water injector. (Wellbore schematic attached). 14. Estimated date for commencing operation 15. Status of well classification as: November. 1991 Oil Gas 16. If proposal was verbally approved Name of approver Date approved Service Signed17' I here~/~i.fl/~at./~e..r~ ~ fore~ue and correct2t.,heTitle ~;(~q..-best of my(~~ · ~~kn°wledge'' FOR COMMISSION USE ONf,_Y // Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test Mechanical Integrity Test'~ BOP sketch Suspended _ Water Injector Date Approved by order of the Commission Form 10-403 Rev 09/12/90 Location clearance Subsequent form require IJAppr°val 10- .~pprovcd Cop~ Returned Commissioner Date ORIGINAL SIGNED BY L0~NIE C. SMITH R E C E iV E DsuguIT IN TRIPLICATE OCT 2 1 1991 Alaska 0il & Gas Cons. Commission Anchorage c/ell: 1 L-1 8 Spud Date: 3 - 1 4 -9 1 Completion Date: 6 - 1 2 - 9 1 Maximum Hole Angle: 44.5 Original Rig RKB: 38' AR J ALASKA INC. - KUPARUK F~ -D APl# 50~029-22145-00 C Sand: OPEN A Sand: OPEN deg. @ 3400' MD All depth are RKB MD to top of equipment. LL Jewelry 1 2 1 3 4 5 6 Well Type: OIL Tree Type: FMC GEN IV Tree Cap Type: Tree Cap Size: Tree Cap O-ring ASN: Last Workover Date: 7- 1 3-9 1 SSSV: CAMCO TRDP-4A-SSSV 2.812" ID @ 1789' PBR: BAKER 3.5" ID @ 7103' PKR: BAKER HB 3.5 ID @ 7116' NOGO: CAMCO'D' NIPPLE 2.750" ID @ 7133' SHEAR OUT: BAKER @ 7167' TUBING TAIL: @ 7168' Minimum ID: 2.750" NOGO Casing and Tubing Size Weight Grade Top Bottom 9.625" 36# J-55 0 4121' 7" 26# J-55 0 7789' 3.5" 9.3# J-55 0 7172' Descri.Dtion CASING CASING TUBING Gas Lift Information Depth Stn# Valve ~ Sz. l..atch 1938' 1 D/V 1" BK2 7036' 2 O/V 1.5" RK port Sz. ,~,1 D# Date Run 9-24-91 10-7-91 5,6 Perforation Data Interval SPF Date Phase FT 7244-7298 6 8-13-91 0 54 7442-7464 4 6-12-91 180 20 7540-7550 4 6-12-91 180 1 0 Zone C A A Comments Comments: LAST TAG: 7620' ON 7-27-91 PBTD: 7700' LAST REVISION: 10-14-91 ARCO Alaska, Inc. Post Office Box 100360 · Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 17, 1991 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in triplicate is an Application for Sundry Approval on the following well. Well Action 1 L-18 Conversion Anticioated Start Date November, 1991 If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Operations Engineer cc: KOE1.4-9 RECEIVED OCT 1 Alaska Oil & Gas COns. Commissior~ Anchorage. ' · ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company AF~3B-6003-C STATE OF ALASKA ~ OIL AND GAS C, ONSERVATION COMM~,.~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Pull tubing 2. Name of Operator 1 5. Type of Well: Development ARCO Alaska. lng Exploratory 3. Address Stratigraphic P. O. Box 100360, Anchorage, AK 99510 Service Operation Shutdown M Stimulate M Plugging Alter casing Repair well x Perforate ~ Other 6. Datum elevation (DF or KB) 130' RKB 7. Unit or Property name Kuparuk River Unit fee~ 4. Location of well at surface 507' FNL, 143' FEL, Sec. 31, T11N, R10E, At top of productive interval 1410' FSL, 1091' FWL, Sec. 32, T11N, R1 At effective depth 1137' FSL, 1238' FWL, Sec. 32, T11N, R1 At total depth 1077' FSL, 1270' FWL, Sec. 32, T11N, R1 UM 0E, UM 0E, UM 0E, UM 12. Present well condition summary Total Depth: measured true vertical 7800' feet 6358' feet Plugs (measured) 8. Well number 1L-18 9. Permit number/approval number 91-35 10. APl number 50-029-22145 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 7700' feet true vertical 6285' feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth 1 22' 1 6" 235 Sx AS I 4120' 9 5/8" 800SxPFTypeE& 500 Sx Premium 7788' 7" 250 Sx Class G 122' 122' 4120' 3566' 7788' 6349' measured 7244'-7298',7442'-7464',7540'-7550' true vertical 5951 '-5991 ',6097'-61 13',6169'-6176' Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55, 7172' Packers and SSSV (type and measured depth) SSSV: Camco TRDP-4A-SSSV, 1789', Packer: Baker HB, 7116' 13. Stimulation or cement squeeze summary Perforated "C" Sand @ 6 SPF on 8/13/91 Intervals treated (measured) 7244'-7298' Treatment description including volumes used and final pressure N/A Alaska Oil & Gas Oon$. C;o~'~s~'~o~ AnChOrag~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 3O0 200 - 0 - 50O 900 200 -0- 8O0 Tubing Pressure 240 240 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Water Injector Oil X__ Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~]ned ¢~~. '/~~/___.. Title ~l~if'~ ~)~/~"¢ ~-/t,~,.Date /~)~?--~' Form 10-404 Rev 09/12/90 (.,/SUBMIT IN DUPLICATE AH(.;O AlaSKa, Inc. SubsIdiary of AtlantIc Richfield Cc" ~y REMARKS ~ WELL SERVICE REPORT · DISTRICT-STATE IDAYS iDATE ~/o 0~oo Oq~O IOO~ 1050 1/20 IlYO ~lYF llqF 11£5' i qzo I [] CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK ARCO Alaska, Inc. Date: October 11, 1991 Transmittal #: 8251 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 ~ Transmitted here with are the following items. Please acknowledge receipt and return [~'~ one signed copy of this transmittal. ~,~1 L- 1 8 Fluid Level Report 9 - 2 9 - 9 1 C~a~_ '.~.g "~ / 2G-09 Fluid Level Report / 9- 2 8- 9 1 TL~'n~,~. . Receipt Acknowledged: DISTRIBUTION: BP Chevron D&M Mobil State of Alaska Unocal ARCO Alaska, Inc. Date: September 20, 1991 Transmittal #: 8234 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. one signed copy of this transmittal. 1L-18 Receipt Please acknowledge receipt and return RECEIVED LIS Tape and Listing 5 - 1 1 - 9 1 7 4 5 6 4 Da~tb;.ska Oil &~as ~ Commissior~ Anchorage DISTRIBUTION: Lynn Goettinger State of Alaska STATE OF ALASKA ? //,~-. ALASr~A OIL AND GAS CONSERVATION COMMI3b,ON - ' ::" ~ '~ ;'.' /.' ,'_.:~ ''~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1' Status of Well Classification of Service Well OIL [~E] GAS ~ SUSPENDED r'~ ABANDONED [~ SERVICE r'~ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 91-35 3 Address 8 APINumber P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22145 4 Location of well at surface ¢~.~,..,_~.~.,~_.~.~ LOC..A. TiC~]~ 9 Unit or Lease Name 507'FNL, 143' FEI~ SEC 31, T11N, R10E, UM ~f ............ J).-':,TE, ! ~ ¥'SffiEi~) ~ KUPARUKRIVER At Top Producing Interval ~ a ' 10 Well Number 1410' ESL, 1091' FWL, SEC 32, T11N, R10E, UM { VERIFIED ~ ~, ~..t. ~____,~.J~~ 1L-18 1077' FSL, 1270' FWL, SEC 32, T11N, R10E, UM KUPARUK RIVER FIELD 5 Elevation in feet (indicate KB, DF, etc.) I 6 Lease Designation and Sedal No. KUPARUK RIVER OIL POOL RKB 130, PAD 87' GLI ADL 25659 ALK 2585 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. J 15 Water Depth, if offshore ! 16 No. of Completions 3/14/91. 3/21/91. 7/13/91.[ NA feet MSLI 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 120 Depth where SSSV set I 21 Thickness of permafrosl 7800' M D, 6358' 1'VD 7700' MD, 6285' 1'VD YES ~] NO E]I 1799' feet MDJ 1500' APPROX 22 Type Electdc or Other Logs Run DIL, SFL, LDT, CNI_, CET, CBL, GYRO 23 CASING, LINER AND CEMENTING RECORD SEI-rlNG DEPTH MD CASING SIZE w-r. PER FT. GRADE TOP BoI-rOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 SURF 122' 24" 235 SX ASI 9-5/8" 36# J-55 SURF 4121' 12-1/4" 800 SX PF TYPE E, 500 SX PREMIUM 7" 26# J-55 SURF 7789' 8-1/2" 250 SX CLASS G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2" '71 7442'-7464' W/4-1/2" CSG G UN @ 4SPF MD 6097'-6113' TVD 7540'-7550' W/4-1/2" CSG GUN @ 4SPF MD 6169'-6176' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC .., DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED SEE ATTACHED ADDENDUM .., 27 PRODUCTION TEST Date First Production IMelhod of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF' WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28 CORE DATA ~rief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. itU o 9199I Form 10-407 Submll In dupllcale Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARJ~RS FORMATION TESTS NAIVE Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. KUPARUK C TOP 7244' 5951' NA KUPARUK C BOTTOM 7298' 59g0' KUPARUK A TOP 7418' 6079' KUPARUK A BOTTOM 7550' 6176' · ~. 31. LIST OF A'I-rACHMENTS GYRO,FRAC, & WELL HISTORY 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate Whe~er from ground level (GL) or other elevation (DF, KB, etc.). Item'S2§!-. Att~C~edi's~P~3~emental records for this well should show the details of any multiple stage cement- ing ~dd~the location of the cementing tool. Item 27:ii.M~th°d of 'Opera.t'~n~;~;Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injectio'n';~[i~r~i~0ther~explain. I~e'n~' 28: If noCores taken, indicate "none". Form 10-407 ARCO ALASI<_A INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: LEASE: API: PERMIT APPROVAL: AFE: WI: 1L-18 NORTH SLOPE KUPARUK RIVER UNIT ADL 25659 ALK 2585 50-029-22145 91-35 AK5555 55.252072 SPUD: 03/15/91 09:30 RELEASE: 03/24/91 00:00 OPERATION: DRILLING RIG: POOL 7 03/15/91 (1) TD: 122' ( 122) SUPV:JRR 03/16/91 (2) TD: 3205' (3083) SUPV:JRR 03/17/91 (3) TD: 4140' ( 935) SUPV:JRR 03/18/91 ( 4) TD: 4140'( SUPV:JRR 0) 03/19/91 (5) TD: 5535'(1395) SUPV:JRR POOL 7 PREP TO SPUD MW: 9.0 VIS: 0 MOVE RIG FROM 1L-14 TO 1L-18. SKID RIG FLOOR OVER CONDUCTOR CSG. NU HYDRIL AND DIVERTER LINES. MIX SPUD MUD. HOOK UP AIR AND STEAM LINES TO RIG FLOOR. RU RISER FLOWLINE, KELLY HOSE, AND MUD LINES. PU BHA. DIRECTIONAL DRILLER INJURED, WO NEW DIRECTIONAL DRILLER. DAILY:S38,877 CUM:$38,877 ETD:S38,877 EFC:$1,330,000 DRILLING 9-5/8"@ 4119' MW:10.0 VIS: 60 PU BHA, WO DIRECTIONAL DRILLER. ORIENT BHA. DRLD F/122-1362' CIRC GAS CUT MUD. DRLD F/1362-3205'. DAILY:$66,9~3 CUM:$105,810 ETD:S105,810 EFC $1,330,000 CIRC BOTTOMS UP 9-5/8"@ 4119' MW:10.4 VIS: 47 DRLD F/3209-4140'. CIRC BOTTOMS UP. SHORT TRIP 15 STANDS. CIRC BOTTOMS UP. GAS CUT MUD. PARTIALLY TOH. HOLE TIGHT AND SWABBING. CIRC GAS CUT MUD. BACK REAM OUT OF HOLE 2287-1546'. WASH AND BACK REAM AS NECESSARY. SWABBING AND PACKING OFF. FINISH TOH. CLEAN OFF BALLED UP BIT AND MOTOR. TIH. TIGHT SPOTS @ 2225', 2319', 2627'. WASH AND REAM TO BOTTOM. CIRC. DAILY:S49,802 CUM:$155,612 ETD:S155,612 EFC:$1,330,000 TEST BOP'S 9-5/8"@ 4119' MW:10.4 VIS: 0 CIRC OUT GAS CUT MUD. TOH AND LD BHA. RU WEATHERFORD. RAN TOTAL OF 97 JTS 9-5/8" 36.0 PPF J-55 BTC CSG. SET CSG @ 4120' CIRC AND COND MUD. PUMP 10 BBL ARCO PREFLUSH, TEST LINES TO 2500 PSI. PUMP 35 BBL ARCO SPACER. DROP BOTTOM PLUG, PUMP 800 SX PERMAFROST E + .25 PPS FLOCELE. DROP PLUG NO. 2, TAILED IN WITH 500 SX CLASS G + 2% CACL + .25 PPS FLOCELE. DROP TOP PLUG. DISPLACE CMT WITH 313 BBL MUD. BUMPED PLUG TO 2000 PSI - OK. FLOATS HELD. HAD 150 BBL CEMENT AND CONTAMINATED MUD RETURNS. WASH OUT DIVERTER, FLOWLINE, AND PITS. ND DIVERTER. SCREW ON FMC 11-3/4" X 11" BRADEN HEAD. BAKER LOCKED AND TORQUED TO 13000 FTLB. NU BOP'S. FUNCTION TEST BOP'S. PU TEST JOINT. DAILY:S208,820 CUM:$364,432 ETD:S364,432 EFC:$1,330,000 DRILLING 9-5/8"@ 4119' MW: 9.2 VIS: 41 FINISH TESTING BOP'S. TEST ANN TO 500 AND 2500 PSI - OK. TEST PIPE RAMS, BLINDS, CHOKE VALVES, HCR VALVE, KILL LINE VALVES TO 500 AND 3000 PSI. TEST KELLY FLOOR SAFETY VALVES TO 3000 PSI. PU BHA AND TIH. SLIP AND CUT DRLG LINE. FINISH TIH AND CIRC THICK MUD. DRLD FC AND CMT. TEST CSG TO 2000 PSI - OK. DRLD FS AND FORMATION TO 4150' PERFORM LEAKOFF TEST TO 11.6 EMW - OK. DRLD FROM 4150-553~' DAILY:S72,806 CUM:$437,238 ETD:S437,238 EFC:~l,330,000 RECEIVED WELL: 1L-18 OPERATION: DRILLING RIG: POOL 7 PAGE: 2 03/20/91 (6) TD: 6745' (1210) SUPV:JRR 03/21/91 (7) TD: 7675'( 930) SUPV:CTD 03/22/91 ( 8) TD: 7800' ( 125) SUPV:CTD 03/23/91 ( 9) TD: 7800'( SUPV:CTD o) 03/24/91 (10) TD: 7700'( SUPV:CTD o) 06/12/91 (11) TD: 7700 PB: 7700 SUPV:GB/WM 06/13/91 (12) TD: 7700 PB: 7700 SUPV:DB DRILLING 9-5/8"@ 4119' MW:10.1 VIS: 37 DRLD F/5535-6286'. EXPERINCING MAGNETIC INTERFERENCE WITH MWD. DROP SURVEY, POH FOR BHA CHANGE. PU BIT #3RR AND MONEL COLLAR. ORIENT MWD AND TIH. RE-SURVEY ALL STATIONS. (NO NET CHANGE.) DRLD F/6286-6601' REPLACE SEAL ON TOP DRIVE. DRLD F/6601-6745' · DAILY:S50,823 CUM:$488,061 ETD:S488,061 EFC:$1,330,000 DRLG 9-5/8"@ 4119' MW:10.4 VIS: 42 DRLD T/7069,POH, TEST FORMATION T/10.9EMW, RIH, DRLD T/7675 DAILY:S67,761 CUM:$555,822 ETD:S555,822 EFC:$1,330,000 CIRC ANCOND MUD 9-5/8"@ 4119' MW:10.6 VIS: 49 DRLD F/7675-7800'. CIRC BOTTOMS UP. 20 STAND SHORT TRIP, HOLE DID NOT TAKE PROPER AMOUNT OF FLUID. CIRC TO INCR MW TO 10.6 PPG. MW CUT FROM 10.4 PPG TO 9.8 PPG. CRUDE OIL IN RETURNS. POH. SLM - NO CORRECTION. RU SCHLUM. RIH W/TRIPLE COMBO, COULD NOT GET BELOW 7191' POH AND RD LOGGERS. TIH. TAG BRIDGE @ 7198'. WORK TIGHT ~POT. CONTINUE IN HOLE. CIRC AND COND MUD. DAILY:S56,169 CUM:$611,991 ETD:S611,991 EFC:$1,330,000 RUNNING 7" CASING 9-5/8"@ 4119' MW:10.6 VIS: 41 POH FOR LOGS. RU SCHLUM AND LOG OPEN HOLE. MADE CONDITIONING TRIP. RU AND RUN 7" 26# J-55 BTC AND BTC MOD CASING. DAILY:S127,838 CUM:$739,829 ETD:S739,829 EFC:$1,330,000 RIG RELEASED 9-5/8"@ 4119' MW:10.6 VIS: 0 FINISHED RUNNING 7" CSG. CIRC AND RECIPROCATE CSG FOR 2-1/2 HRS PRIOR TO CEMENTING 7". CMT 7" W/ 250 CLASS 'G' AND ADDITIVES AT 15.6 PPG. BUMPED PLUGS AND FLOATS HELD. HANG OFF 7" AND CUT OFF CASING. ND BOP STACK. INSTALL TUBING SPOOL. FREEZE PROTECT ANNULUS AND RELEASE RIG. DAILY:S166,985 CUM:$906,814 ETD:S906,814 EFC:$1,330,000 WAIT ON SLICKLINE UNIT 9-5/8"@ 4119' MW:10.6 NaCl/Br ACCEPT RIG @ 0700 HRS 6-11-91. NU BOP'S AND TEST. RU SWS AND PERFORATE WELL. RUN 3-1/2" SINGLE COMPLETION ASS'Y. DROP BALL TO SET PKR. COULD NOT PRESSURE UP TBG. DROP SECOND BALL. STILL COULD NOT PRESSURE UP TBG. WAIT ON SLICK- LINE TO SET PLUG. DAILY:S181,074 CUM:$1,087,888 ETD:S1,087,888 EFC:$1,330,000 RELEASED RIG 9-5/8"@ 4119' MW:10.6 NaCl/Br RU SLICKLINE. SET PLUG IN 'D' NIPPLE. WELL STILL CIRCULATES. FOUND CIRC VALVE IN LOWEST GLM. REPLACE W/ CHECK VALVE. PRESSURE UP AND SET PKR. SHEARED PBR. TEST SSSV. ND BOP'S AND NU TREE. TEST SAME. FREEZE PROTECT AND SECURE WELL. RIG RELEASED 1930 HRS 6-12-91. DAILY:S139,049 CUM:$1,226,937 ETD:S1,226,937 EFC:$1,330,000 DATE: ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: LEASE: API: PERMIT APPROVAL: AFE: WI: 1L-18 NORTH SLOPE KUPARUK RIVER UNIT ADL 25659 ALK 2585 50-029-22111 91-35 AK5555 55.252072 ACCEPT: 06/11/91 07:00 RELEASE: 06/12/91 19:30 ACCEPT: 07/10/91 12:00 RELEASE: 07/13/91 12:00 OPERATION: COMPLETION RIG: NORDIC 1 06/12/91 (11) TD: 7700 PB: 7700 SUPV:GB/WM 06/13/91 (12) TD: 7700 PB: 7700 SUPV:DB 07/11/91 (13) TD: 7700 PB: 7700 SUPV:DB 07/12/91 (14) TD: 7700 PB: 7700 SUPV:DB 07/13/91 (15) TD: 7700 PB: 7700 SUPV:DB 07/14/91 (16) TD: 7700 PB: 7700 SUPV:DB NORDIC 1 WAIT ON SLICKLINE UNIT 9-5/8"@ 4119' MW:10.6 NaC1/Br ACCEPT RIG @ 0700 HRS 6-11-91. NU BOP'S AND TEST. RU SWS AND PERFORATE WELL. RUN 3-1/2" SINGLE COMPLETION ASS'Y. DROP BALL TO SET PKR. COULD NOT PRESSURE UP TBG. DROP SECOND BALL. STILL COULD NOT PRESSURE UP TBG. WAIT ON SLICK- LINE TO SET PLUG. DAILY:S181,074 CUM:$1,087,888 ETD:S1,087,888 EFC:$1,330,000 RELEASED RIG 9-5/8"@ 4119' MW:10.6 NaCl/Br RU SLICKLINE. SET PLUG IN 'D' NIPPLE. WELL STILL CIRCULATES. FOUND CIRC VALVE IN LOWEST GLM. REPLACE W/ CHECK VALVE. PRESSURE UP AND SET PKR. SHEARED PBR. TEST SSSV. ND BOP'S AND NU TREE. TEST SAME. FREEZE PROTECT AND SECURE WELL. RIG RELEASED 1930 HRS 6-12-91. DAILY:S139,049 CUM:$1,226,937 ETD:S1,226,937 EFC:$1,330,000 POH W/ COMPLETION ASS'Y 9-5/8"@ 4119' MW:10.6 NaCl/Br ACCEPT RIG @ 1200 HRS 7-10-91. MIX BRINE AND KILL WELL BY BULLHEADING 10.6 PPG BRINE DOWN TUBING. ND TREE AND NU BOP'S. TEST BOPE. PULL AND STD BACK 3-1/2" COMPLETION ASS'Y. DAILY:S53,695 CUM:$1,280,632 ETD:S1,280,632 EFC:$1,330,000 GIH W/ BIT & SCRAPER 9-5/8"@ 4119' MW:10.6 NaC1/Br FIN POH W/ COMPLETION ASS'Y. PU BHA AND 3-1/2" DP AND GIH. SPEAR PACKER. JAR ON PACKER 2 HRS. PACKER RELEASED. POH AND LD PACKER. LD FISHING TOOLS. PU BIT AND SCRAPER AND GIH. DAILY:S28,147 CUM:$1,308,779 ETD:S1,308,779 EFC:$1,330,000 SETTING BPV 9-5/8"@ 4119' MW:10.6 NaC1/Br FINISH GIH TO FC. CBU. POH AND LD DP. RU AND RUN 3-1/2" SINGLE COMPLETION ASS'Y. TEST SSSV AND CONTROL LINE. SET PACKER. TEST ANNULUS. SHEAR PBRAND RETEST ANNULUS. FUNCTION AND TEST SSSV. SHEAR OUT BALL. CLOSE SSSV AND INSTALL BPV. DAILY:S52,383 CUM:$1,361,162 ETD:S1,361,162 EFC:$1,330,000 RIG RELEASED 9-5/8"@ 4119' MW:10.6 NaCl/Br SET BPV AND ND BOP STACK. NU AND TEST TREE. OK. OPEN SSSV AND FREEZE PROTECT WELL. SECURE WELL AND PREPARE FOR RIG MOVE. DAILY:S22,346 CUM:$1,383,508 ETD:S1,383,508 EFC:$1,330,00 DATE: ADDENDUM WELL: 7/21/91 1L-18 Frac KRU "A" sand perfs from 7442'-7464', 7540'-7550' @ 4spf in 10 stages as follows: Stage 1. Pmp 150 bbls YF240D XL GW @ 25 bpm 7100-4950psi Stage 2 Pmp 84 bbls YF240D Non XL GW @ 25 bpm 4950-4230 psi ISIP: 2436 FRAC GRAD: 84 PERF FRIC: 0 Stage 3 Pmp 700 bbls YF240D XL GW @ 25 bpm 4275-4750-4520 psi Stage 4 Pmp150 bbls YF240D XL GW w/2ppg 12/18 Carbolite @ 25 bpm 4520- 4482 ps~ Stage 5 Pmp125 bbls YF240D XL GW w/4ppg 12/18 Carbolite@ 25 bpm 4482- 4670 ps~ Stage 6 Pmp 100 bbls YF240D XL GW w/6ppg 12/18 Carbolite @ 25 bpm 4670- 4985ps~ Pmp 75 bbls YF240D XL GW w/8ppg12/18 Carbolite @ 25 bpm 4985- 5200 ps~ Pmp 50 bbls YF240D XL GW w/10ppg 12/18 Carbolite @ 25 bpm 5200- 5159 ps~ Pmp 36 bbls YF240D XL GW w/12ppg 12/18 Carbolite @ 25 bpm 5159- 5384 ps~ Prop 12 bbls YF240D XL GW 5384-6500 psi Pmp 12 bbls YF240D Non XL GW 5384-6500 psi Pmp 39 bbls Slick Diesel Flush 5384-6500 psi from having job flushed 12 # @ perfs Stage 7 Stage 8 Stage 9 *Stage 10 * Screend out 7 bbls Average Pressure: Fluid to recover: Sand in zone: Sand in casing: 5,000 psi 1,218 H20 93,067# 12/18 2,285# 12/18 Dr~rin(e~ · UB-~ URFA GE DIRECTIONAL ~----'] UIDANCE I'~ONTINUOUS SURVEY RE~E'IVED AUG o o 1991 Company ARCO ALASKA, INC. Well Name 1L-:I8 (507' FNL, 143' FEL, SEC 31, Tl ll~I FieldlLocation KUPARUK, NORTH SLOPEr A,LASKA RIOE) Job Reference No. Date 74584 lO-MAY-91. Logged By: Computed By: FORMICA KOHRING GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. 1L-lB KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE: lO-MAY-1991 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. ENGINEER: FORMICA Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 19 DEG 9 MIN EAST ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA COMPUTATION DATE: 29-MAY-91 PAGE 1 DATE OF SURVEY: lO-MAY-1991 KELLY BUSHING ELEVATION: 130.00 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIAT[ON AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN ENGINEER: FORMICA 0 0 N 0 0 E O0 -30 . O0 0 5 S 0 19 E O0 70.00 0 11 S 2 23 E O0 170 . O0 0 10 S 11 52 E O0 270.00 0 10 S 16 56 E O0 370.00 0 9 5 27 13 E O0 470,00 0 9 S 31 11 E O0 570,00 0 12 S 20 51 E O0 670.00 0 16 S 13 25 E O0 770.00 0 13 S 1 2 W 0.00 100.00 100 200.00 200 300.00 300 400.00 40O 500.00 500 600.00 600 700.00 700 800.00 800 900.00 900 0 O0 -130.00 1000.00 999.99 869.99 0 11 S 35 21 E 1100.00 1099.99 969.99 0 30 5 38 3 E 1200.00 1199.97 1069.97 2 13 S 19 30 E 1300.00 1299.73 1169.73 5 55 S 19 12 E 1400.00 1398.82 1268.82 9 53 S 17 22 E 1500.00 1496.67 1366.67 14 6 S 15 15 E 1600,00 1592.81 1462.81 17 40 S 15 46 E 1700.00 1687.77 1557.77 18 39 S 15 31 E 1800.00 1782.04 1652.04 20 6 S 14 47 E 1900,00 1875.73 1745.73 21 1 S 15 15 E 2000,00 1968 29 1838.29 23 26 30 1929.30 25 42 97 2017.97 29 23 35 2103 35 33 8 61 2185 61 36 13 77 2264 77 39 14 67 2340 67 41 50 68 2414 68 42 35 95 2487 95 43 13 43 2560.43 43 48 2100.00 2059 2200.00 2147 2300.00 2233 2400.00 2315 2500,00 2394 2600.00 247O 2700.00 2544 2800.00 2617 2900.00 2690 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 0 00' 0 06 0 28 0 58 0 87 1 16 1 40 1 72 2 12 2 59 3000 O0 2762.38 2632.38 44 11 O0 2833.76 2703.76 44 43 O0 2904.72 2774.72 44 47 O0 2975.96 2845.96 44 29 O0 3047.24 2917.24 44 23 O0 3118.85 2988.85 44 18 O0 3190,30 3060.30 44 27 O0 3261.88 3131.88 43 51 O0 3334.32 3204.32 43 31 O0 3406.83 3276.83 43 34 3100 32O0 3300 34OO 3500 3600 3700 3800 3900 2 91 3 42 5 35 11 97 25 28 45 73 73 15 104 42 137 71 172.57 S 16 33 E 210.35 S 15 14 E 251.70 S 14 30 E 297.76 S 15 11 E 349.62 S 15 39 E 406.35 S 14 54 E 467.29 S 15 57 E 532.22 S 16 13 E 599.38 S 16 40 E 667.36 S 17 35 E 736.21 805 63 63 O6 18 28 O6 01 83 76 63 S 17 25 E S 17 26 E 875 S 17 12 E 946 S 16 56 E 1016 S 17 32 E 1086 S 17 57 E 1156 S 17 57 E 1226 S 18 32 E 1295 S 18 58 E 1364 S 19 0 E 1433 0 O0 0 O0 0 O0 0 18 0 O0 0 O0 0 28 0 O0 0 O0 0 06 0 O0 N 0 08 S 031 S 0625 0 90 S 1 17 S 1.38 S 1.67 S 2.05 S 2.53 5 0.00 E 0.00 N 0 0 E 0.04 W 0.09 S 26 45 W 0.04 W 0.31 S 7 24 W 0.01 W 0.62 S 0 58 W 0.05 E 0.91 S 3 27 E 0.18 E 1.18 S 8 32 E 0.30 E 1.41 S 12 11 E 0.43 E 1.73 S 14 27 E 0,54 E 2.12 S 14 47 E 0.61 E 2.60 S 13 27 E 0.00 0.91 2,83 3.37 3.94 4.21 1 .92 1 .36 0.71 1 .98 2.84 S 3.25 S 5.01 $ 11.24 S 23.88 S 43.53 S 70.02 S 100.20 S 132.37 S 166. 17 S 0.69 E 2.92 S 13 44 E 1.07 E 3.43 S 18 11 E 1.87 E 5.35 S 20 29 E 4.12 E 11.97 S 20 9 E 8 31 E 25.28 S 19 12 E 14 05 E 45.75 S 17 54 E 21 35 E 73.20 $ 16 58 E 29 78 E 104,53 S 16 33 E 38 59 E 137,88 S 16 15 E 47 53 E 172.83 S 15 58 E 2.03 3.82 4.06 3.28 3.10 3.44 1 .56 0.43 1 .38 0.36 202.51 S 242,34 S 69 286.98 S 81 337 31 5 94 392 05 S 109 451 O0 S 125 513 80 S 142 578 40 S 161 643 73 S 180 709 51 S 201 58 05 E 210 67 S 16 0 E 44 E 252 26 E 298 41E 35O 72 E 407 76 E 468 83 E 533 52 E 600 60 E 668 10 E 737 O9 S 15 59 E 27 5 15 49 E 27 S 15 38 E 12 S 15 38 E 20 S 15 35 E 28 S 15 32 E 53 S 15 36 E 59 S 15 40 E 45 S 15 49 E 0 46 051 061 0 45 1 21 0 37 021 1 6O 0.27 0.13 775.74 S 221.98 E 806.87 S 15 58 E 842.56 S 242.95 E 876.89 S 16 5 E 909,82 S 263,97 E 947.34 S 16 11 E 976.92 S 284.50 E 1017.50 S 16 14 E 1043.97 S 305.09 E 1087.63 S 16 17 E 1110.41 S 326.47 E 1157.40 S 16 23 E 1176.96 S 348.06 E 1227.35 S 16 28 E 1243.33 S 369.75 E 1297.15 S 16 34 E 1308.58 S 392.00 E 1366.04 S 16 41 E 1373.70 S 414.42 E 1434.85 S 16 47 E ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH COMPUTATION DATE: 29-MA¥-91 PAGE 2 DATE OF SURVEY: lO-MAY-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3479.16 3349.16 43 47 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 3551.42 3421.42 43 32 O0 3624.02 3494.02 43 29 O0 3696.47 3566.47 43 42 O0 3768.71 3638.71 43 43 O0 3840.89 3710.89 43 55 O0 3912.86 3782.86 43 51 O0 3985.24 3855.24 43 16 O0 4059.15 3929.15 41 34 O0 4135.56 4005.56 39 18 S 19 0 E 1502 68 S 19 17 E 1571 80 S 19 50 E 1640 57 S 20 0 E 1709 50 S 20 13 E 1778 64 S 20 24 E 1847 83 S 20 40 E 1917.24 S 20 50 E 1986.21 S 20 11 E 2053.55 S 19 15 E 2118.03 5000.00 4212.91 4082.91 39 17 5100.00 4291.71 4161.71 36 42 5200,00 4372,42 4242.42 35 19 5300.00 4454.20 4324.20 35 10 5400.00 4535.78 4405.78 35 26 5500.00 4617.12 4487.12 35 38 5600,00 4698.69 4568.69 34 7 5700,00 4783.83 4653.83 30 25 5800.00 4869,89 4739,89 30 53 5900.00 4954.80 4824.80 33 2 S 19 8 E 2181.42 S 18 18 E 2242.96 S 18 21 E 2301.98 S 18 15 E 2359.53 S 18 23 E 2417.35 S 18 26 E 2475.52 S 19 0 E 2533.37 S 20 20 E 2585.76 S 20 25 E 2636.67 S 21 44 E 2689.45 6000 O0 5036.05 4906.05 37 52 6100 6200 630O 6400 6500 6600 6700 6800 6900.00 5700.68 5570 O0 5113.25 4983 25 41 7 O0 5186.71 5056 O0 5259.70 5129 O0 5333.44 5203 O0 5407.19 5277 O0 5480.70 5350 O0 5554.23 5424 O0 5627.64 5497 71 43 17 70 42 55 44 42 22 19 42 38 70 42 43 23 42 40 64 42 55 68 43 8 S 22 5 E 2747.61 S 20 44 E 2811.10 S 21 35 E 2878.90 S 22 39 E 2947.17 S 27 5 E 3014 29 S 27 32 E 3081 15 S 28 7 E 3148 17 S 28 41 E 3215 07 S 29 3 E 3281 99 S 29 24 E 3349 25 7000.00 5773 57 5643.57 43 19 7100.00 5846 72OO.O0 5919 7300.00 5992 7400.00 6065 7500.00 6139 7600.00 6212 7700.00 6285 7800.00 6358 S 29 41 E 3416,58 31 5716.31 43 4 S 28 49 E 3484.08 26 5789.26 43 20 S 28 14 E 3551.60 29 5862.29 42 45 S 28 2 E 3619.09 73 5935.73 42 47 S 28 14 E 3686.12 19 6009.19 42 43 S 28 27 E 3753.10 57 6082.57 43 1 S 28 25 E 3820.14 45 6155.45 43 18 S 28 12 E 3887.74 22 6228.22 43 18 S 28 12 E 3955.48 0.21 1,16 1504 0.34 1569 0.22 1633 0.43 1698 0.19 1763 1.13 1828 0.99 1893 1.76 1956 0.17 2017 0.94 1 .05 1 .74 0.23 0.16 0.22 6.55 0.45 1 .08 3.13 2 82 3 86 0 62 313 0 49 0 50 0 49 0.47 0.44 0.63 0.53 1 .6O 0.50 0.42 0.42 0.26 0.53 0.00 0.00 1438 99 S 436 89 E 1503.85 S 16 53 E 32 S 459 10 S 482 91S 506 85 S 529 75 S 553 79 S 578 28 S 602 36 S 626 09 S 647 48 E 1572.93 S 16 59 E 55 E 1641.63 S 17 6 E 06 E 1710.48 S 17 13 E 78 E 1779.54 S 17 19 E 84 E 1848.66 S 17 26 E 13 E 1918.00 S 17 33 E 65 E 1986.88 S 17 39 E 28 E 2054.16 S 17 45 E 98 E 2118.61 S 17 49 E 2076 95 S 668 81 E 2181.98 S 17 51 E 2135 2191 2245 2300 2356 2410 2460 2507 2557 26 S 688 26 S 707 93 S 725 82 S 743 02 S 761 87 S 780 13 S 797 88 S 815 52 E 2243 52 S 17 52 E 16 E 2302 54 S 17 53 E 17 E 2360 10 S 17 54 E 35 E 2417 92 S 17 54 E 73 E 2476 10 S 17 55 E 09 E 2533 94 S 17 56 E 95 E 2586 31 S 17 58 E 66 E 2637.19 S 18 1 E 16 S 834.63 E 2689.92 S 18 5 E 2611 17 S 856.40 E 2748 02 S 18 9 E 2670 2733 2797 2858 2918 2978 3037 3097 3156 37 S 879.46 E 2811 60 S 904.04 E 2879 06 S 929.44 E 2947 03 S 958,47 E 3014 05 S 989.42 E 3081 01 S 1021.05 E 3148 64 S 1053.28 E 3215 10 S 1086.06 E 3282 72 S 1119.41 E 3349 47 S 18 14 E 21 S 18 18 E 44 5 18 23 E 46 S 18 32 E 23 S 18 44 E 19 S 18 56 E 07 S 19 7 E 01 S 19 19 E 32 S 19 32 E 3216.27 S 1153.18 E 3416.76 S 19 43 E 3275.99 S 1186.96 E 3484.39 S 19 55 E 3336.19 S 1219.44 E 3552.07 S 20 5 E 3396.46 S 1251.60 E 3619.73 S 20 14 E 3456.30 S 1283.62 E 3686.96 S 20 22 E 3516.00 S 1315.87 E 3754,17 S 20 31 E 3575,74 S 1348.21 E 3821.46 S 20 40 E 3636.04 S 1380.63 E 3889.33 S 20 48 E 3696.49 S 1413.03 E 3957.37 S 20 55 E COMPUTATION DATE: 29-MAY-91 PAGE 3 ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: lO-MAY-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: FORMICA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 1000.00 999.99 869 99 0 11 S 35 21 E 2 2000.00 1968.29 1838 29 23 26 S 16 33 E 210 3000.00 2762.38 2632 38 44 11 S 17 25 E 805 4000.00 3479.16 3349 16 43 47 S 19 0 E 1502 5000.00 4212.91 4082 91 39 17 S 19 8 E 2181 6000.00 5036.05 4906.05 37 52 S 22 5 E 2747 7000.00 5773.57 5643.57 43 19 S 29 41 E 3416 7800.00 6358.22 6228.22 43 18 S 28 12 E 3955 0.00 -130 O0 0 0 N 0 0 E 0 O0 91 35 63 68 42 61 58 48 0 O0 0 2 0 0 0 2 0 0 0.00 N 0.00 E 0.00 N 0 0 E O0 2.84 S 0.69 E 2.92 S 13 44 E 03 202.51 S 58.05 E 210.67 S 16 0 E 46 775.74 S 221.98 E 806.87 S 15 58 E 21 1438,99 S 436.89 E 1503,85 S 16 53 E 94 2076.95 S 668.81 E 2181.98 S 17 51 E 82 2611.17 S 856.40 E 2748.02 S 18 9 E 53 3216.27 S 1153.18 E 3416.76 S 19 43 E O0 3696.49 S 1413.03 E 3957.37 5 20 55 E ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA COMPUTATION DATE: 29-MAY-91 PAGE 4 DATE OF SURVEY: lO-MAY-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 130 230 330 430 530 630 730 830 93O 0.00 -130.00 0 0 N 0 0 E 0.00 0.00 O0 130.00 0.00 0 7 S 2 6 W 0.10 0.00 O0 230.00 100.00 0 10 $ 3 22 E 0.37 0.00 O0 330.00 200.00 0 10 S 11 56 E 0.67 0.00 O0 430.00 300.00 0 10 S 24 13 E 0.96 0.00 O0 530.00 400.00 0 8 S 30 27 E 1.23 0.00 O0 630.00 500.00 0 11 S 27 2 E 1.49 0.00 O0 730.00 600.00 0 13 S 17 36 E 1.83 0.00 O0 830.00 700.00 0 17 S 10 42 E 2.26 0.00 O0 930.00 800.00 0 12 S 6 52 E 2.69 0.09 0.00 N 0.00 E 0.00 N 0 0 E O. 12 S 0.04 W O. 13 S 17 31 W 0.41 S 0.04 W 0.41 S 5 0 W 0.71 S 0.01 E 0.71 S 0 37 E 0.99 S 0.09 E 0.99 S 5 0 E 1.23 S 0.21 E 1.25 S 9 38 E 1.46 S 0.34 E 1.50 S 13 9 E 1.77 S 0.47 E 1.83 S 14 44 E 2.19 S 0.57 E 2.27 S 14 38 E 2.64 S 0.61 E 2.71 S 12 59 E 1030.01 1030.00 900.00 0 18 S 39 16 E 3.03 0.19 1130.01 1130.00 1000.00 0 46 S 28 43 E 3.74 0.98 1230.061230.00 1100.00 2 52 S 20 30 E 6.69 1.67 1330.46 1330.00 1200.00 6 46 S 18 52 E 15.34 3.06 1431.71 1430.00 1300.00 11 1 S 16 51 E 31.02 3.98 1534.47 1530.00 1400.00 15 25 S 15 17 E 54.51 3.39 1639.11 1630.00 1500.00 18 14 S 15 39 E 85.22 0.84 1744.68 1730.00 1600.00 19 27 S 15 30 E 119.00 1.67 1851.12 1830.00 1700.00 20 24 S 14 42 E 155.35 0.77 1958.42 1930.00 1800.00 22 29 S 16 27 E 194.15 2.65 2.94 S 0.77 E 3.04 S 14 41 E 3.53 S 1.25 E 3.74 S 19 26 E 6.27 S 2.33 E 6.69 S 20 22 E 14.42 S 5.22 E 15.34 S 19 54 E 29.36 S 10.00 E 31.02 S 18 48 E 52.02 S 16.37 E 54.54 S 17 28 E 81.66 S 24.62 E 85.29 S 16 47 E 114.28 S 33.69 E 119.14 S 16 26 E 149.49 S 43.08 E 155.57 S 16 5 E 186.96 S 53.44 E 194.45 S 15 57 E 2067,62 2030,00 1900,00 24 49 S 15 45 E 237,95 2179,44 2130,00 2000,00 28 32 S 14 39 E 287,80 2296,00 2230,00 2100,00 33 0 S 15 7 E 347,44 2417,87 2330,00 2200,00 36 45 S 15 31 E 416 93 2545,93 2430,00 2300,00 40 32 S 15 0 E 496 68 2680,07 2530,00 2400,00 42 29 S 16 13 E 585 93 2816,55 2630,00 2500,00 43 20 S 16 57 E 678 68 2954,92 2730,00 2600,00 44 0 S 17 30 E 774 28 3094,71 2830,00 2700,00 . 44 41 S 17 26 E 871 91 3235,56 2930,00 2800,00 44 36 S 17 2 E 971 06 2.14 4,39 3,25 2,76 2.62 0.60 1,64 0,37 0,53 0,63 229,05 S 65.76 E 238,30 S 16 1 E 277,31 S 78,75 E 288,28 S 15 51 E 335,20 S 93,84 E 348,09 S 15 38 E 402.26 S 112,57 E 417,72 S 15 38 E 479,47 S 133,34 E 497,67 S 15 32 E 565,46 S 157,76 E 587.06 S 15 35 E 654,59 S 183,87 E 679,92 S 15 41 E 745,82 S 212,57 E 775,52 S 15 55 E 839,01 S 241.84 E 873,17 S 16 5 E 933,72 S 271,33 E 972,35 S 16 12 E 3375 85 3030,00 2900,00 44 32 S 17 12 E 1069,37 3515 3655 3794 3932 4070 4208 4346 4484, 4623 58 3130,00 3000 O0 44 21 S 17 58 E 1166,94 59 3230.00 3100 O0 44 20 S 18 5 E 1264,91 04 3330,00 3200 O0 43 31 S 18 58 E 1360,66 O0 3430,00 3300 O0 43 37 S 19 1 E 1455,69 40 3530,00 3400 O0 43 42 S 19 7 E 1551,38 24 3630,00 3500 O0 43 29 S 19 53 E 1646,24 41 3730,00 3600 O0 43 46 S 20 3 E 1741,58 88 3830,00 3700,00 43 54 S 20 23 E 1837,35 75 3930,00 3800,00 43 44 S 20 48 E 1933,68 1 18 1027,82 S 300.04 E 1070,72 S 16 16 E 15 1120 76 S 329,82 E 1168,28 S 16 24 E 95 1213 97 S 360.05 E 1266,24 S 16 31 E 25 1304 70 S 390,67 E 1361,94 S 16 40 E 27 1394 56 S 421,60 E 1456,90 5 16 49 E 38 1485 03 S 452,77 E 1552,52 S 16 57 E 22 1574 43 S 484,47 E 1647,29 $ 17 6 E 19 1664 06 S 517,04 E 1742,53 S 17 16 E 40 1753 92 5 550,19 E 1838,19 S 17 25 E 33 1844,17 S 583,94 E 1934,41 S 17 34 E ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA COMPUTATION DATE: 29-MAY-91 PAGE 5 DATE OF SURVEY: 10-MA¥-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4760.89 4030.00 3900.00 42 3 S 20 29 E 2027.48 4892.81 4130.00 4000.00 39 19 S 19 16 E 2113.48 5022.04 4230.00 4100,00 38 59 S 19 1 E 2195.33 5147.66 4330.00 4200.00 36 21 S 18 29 E 2271.33 5270.41 4430.00 4300.00 35 7 S 18 13 E 2342.50 5392.90 4530.00 4400.00 35 25 5 18 23 E 2413.24 5515.85 4630.00 4500.00 35 39 S 18 24 E 2484.76 5637.30 4730.00 4600.00 31 41 S 19 57 E 2553.62 5753.59 4830,00 4700.00 30 37 S 20 21 E 2612.96 5870.54 4930.00 4800.00 32 21 S 21 28 E 2673.56 5992.33 5030.00 4900.00 37 40 S 22 11 E 2742.91 6122.43 5130.00 5000.00 42 5 S 20 57 E 2826.02 6259.37 5230.00 5100.00 43 6 S 21 43 E 2919.49 6395.35 5330.00 5200.00 42 22 5 27 3 E 3011.19 6531.00 5430.00 5300.00 42 39 S 27 44 E 3101.92 6667.06 5530.00 5400.00 42 38 S 28 29 E 3193.06 6803.22 5630.00 5500,00 42 56 S 29 4 E 3284.16 6940.20 5?30.00 5600.00 43 12 S 29 32 E 3376.30 7077.64 5830.00 5700.00 43 14 S 29 19 E 3469.01 7214.76 5930.00 5800.00 43 22 S 28 13 E 3561.60 7351.34 6030.00 5900.00 42 44 S 28 12 E 3653.49 7487.50 6130.00 6000.00 42 41 5 28 27 E 3744.73 7623.86 6230.00 6100.00 43 6 5 28 25 E 3836.22 7761.22 6330.00 6200.00 43 18 S 28 12 E 3929.21 7800.00 6358.22 6228.22 43 18 S 28 12 E 3955.48 1,65 1931.91 $ 617,24 E 2028.12 S 17 43 E 0.23 2012.79 S 646,48 E 2114.06 S 17 48 E 2,54 2090.10 5 673.36 E 2195.89 5 17 51 E 1.41 2162.18 5 697.47 E 2271.89 S 17 53 E 0.10 2229.75 S 719.84 E 2343.07 5 17 54 E 0.05 2296.92 S 742.05 E 2413,81 S 17 54 E 0.30 2364.78 S 764.65 E 2485.33 S 17 55 E 5.21 2429.97 S 786.84 E 2554.19 S 17 57 E 0.27 2485.65 S 807.40 E 2613.49 S 18 0 E 1.96 2542.37 S 828.78 E 2674.05 S 18 3 E 2.54 2606.81 S 854.63 E 2743.32 S 18 9 E 4.77 2684.32 S 884.78 E 2826,38 5 18 15 E 0.61 2771,38 S 919.01 E 2919.78 S 18 21 E 0.60 2855.24 S 957.05 E 3011.36 S 18 32 E 0.57 2936.66 S 999.15 E 3101.98 S 18 47 E 0.54 3018.05 S 1042.60 E 3193.06 S 19 3 E 0.45 3099.02 5 1087.12 E 3284.17 S 19 20 E 0,36 3380.66 S 1132.93 E 3376.41 S 19 36 E 2.04 3262,62 S 1179.53 E 3469.29 S 19 53 E 0.27 3345.11 S 1224.23 E 3562.09 S 20 6 E 0.26 3427.18 S 1268.01 E 3654.24 S 20 18 E 0.05 3508.55 S 1311.83 E 3745.77 S 20 30 E 0.53 3590.07 S 1355.96 E 3837.60 S 20 41 E 0.00 3673.05 S 1400.47 E 3930.98 S 20 52 E 0.00 3696,49 S 1413.03 E 3957.37 S 20 55 E COMPUTATION DATE: 29-MAY-91 PAGE ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER BOTTOM 9 5/8" CASING TOP KUPARUK C BASE KUPARUK C TOP KUPARUK A BASE KUPARUK A GCT LAST READING PBTD BOTTOM 7" CASING TD DATE OF SURVEY: lO-MAY-1991 KELLY BUSHING ELEVATION= 130.00 FT ENGINEER: FORMICA INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 507' FNL & 143' FEL, SEC31 T11N RIOE MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 4120.00 7244.00 7298.00 7418.00 7'550.00 7651.04 7700.00 7788.00 7800.00 3565.94 3435.94 5951.29 5821.29 5990.82 5860.82 6078.94 5948.94 6175.92 6045.92 6249.83 6119.83 6285.45 6155.45 6349.49 6219.49 6358.22 6228.22 1517.30 S 3362.78 S 3395.26 S 3467.06 5 3545.83 5 3606.44 5 3636.04 S 3689.24 S 3696.49 S 464.05 E 1233.68 E 1250.96 E 1289 41E 1332 02 E 1364 77 E 1380 63 E 1409 15 E 1413 03 E COMPUTATION DATE: 29-MAY-91 PAGE 7 ARCO ALASKA, INC. 1L-18 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: lO-MAY-1991 130.00 FT FORMICA ************ STRATIGRAPHIC SUMMARY SURFACE LOCATION = 507' FNL & 143' FEL, SEC31T11N RIOE MARKER MEASURED DEPTH TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST TOP KUPARUK C BASE KUPARUK C TOP KUPARUK A BASE KUPARUK A PBTD TD 7244.00 5951.29 5821.29 3362.78 S 1233.68 E 7298.00 5990.82 5860.B2 3395.26 S 1250.96 E 7418.00 6078.94 5948.94 3467.06 S 1289.41 E 7550.00 6175.92 6045.92 3545.83 5 1332.02 E 7700.00 6285.45 6155.45 3636.04 S 1380.63 E 7800.00 6358.22 6228.22 3696.49 S 1413.03 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 7800.00 6358.22 6228.22 3957.37 S 20 55 E SCHLUMBERGER O I REC T I ONAL SURV E Y COMPANY ARCO ALASKA, INC. WELL 1L-18 F I ELD KUPARUK R I VER COUNTRY USA RUN ONE DATE LOOOEO 10 - MAY - 9i REFERENCE 74584 WELL' 1 L 1 8 ,{507' FHL, 143' FEL, SEC '"'qRIZONTAL PROJECTION NORTH 3000 REF 74S84 SCALE : !/1000 IN/FT .... i--~---f---f--H'ff--i--i----'!---f-4'-i--+-i-'i--i"-? ....... i---H-'-f+-f'-f--f'i'--i ..-H--.f-.?"i..-f-id ....... f--ffi--i--i...f.-f.-H ....... !'-H--H'i-"~"i'-'t'-", "'f"f""?-.'~"'j-'+-'}' ~d .... · ..... Y"T"' "T"r'"r'T'" "T-'?"T"r" "T'T"t'T'- "T"t"'~'"~ ...... ~'"?"'i"'t"~"T"Y'T": ..... ,'"Y"T"r- "'T"r"~"'r'T"Y"T"'?'"~ ....... ?k-'~""r"'""~"-f"y"~ ........ ~'-"~'"y-i ...... i"'f'"k": ........ ?f.+.4 ...... ?..f-+.-! .... '?'"t'T]~"?"t"'t"?'-''?'ti''?':~-?'?''t'?'''-'?''t'?''t''~'''t't'?''t'' "?"t"?'?'~'"t'"t'?'?"~?!-?"tT"t't'-'t't ....... f"f'?t"'~'"t't"'t'"t ....... t"t"'t"'t"~"?"t"i"'i ...... t"'i"'H ...... ~-- --4.-.~..4 .... ~ ~---4.-~.--~--- .-4--4--4..-4.. -,4-.~,-4---4 ....... 4.--4--~-.-~.-- .-~-.4--4--~--- .-4.--4..-4.-4 ..... ~-.4.-4--~ ~.,4---4..~--4 ...... 4--.4-..~..-4 ....... ~...~...x...~...~...~...~.-.~..,4...~ ...4-.~-.4.-.~..- ..4-..~.-.4-.~ ...... H.~...~...~ 2000 ~ ~ ~ ~ T ~ j T'~T"q'T'TT"j l ] ~ I ~' T ..... YT"'I"TTTTT"T ...... T"T"T .........] T'T'T"'T ....... T ...... T"T"yyT"T"'T .... :-~-+--4..4--q..4-..4.-4-.-4 ....... 4..4."4..-~...{..~...4...4..4...`..+~+.4...4.q..+.+.~..~..-q...4`..4..4..4..4..+.+.+..4...:..+.+.+.+.?..4...4...4...4 ....... 4...4--.4...4---H..+--4..-4-.-~.-.4.-4...4-..4...4...4...4..+..4 ....... H...4.-.4...4.-.4.-+..;.-.; -~.4..~..~..+.~..4-~.~..- ..~..~..~...;-1..~..~...;..~ ...... ,..+ 4...~.4.4.4 4...~ ...... ,..~...;...~..4.4...,..~...; ...... ,-4-~.4...~...,...;...,.4 ...... ,...L.;...,...~.4 4.4..&... 4...,...L..~ ..... L 4...L 4... . q.4.~4.4-4.4-~.-4~.4..-..~..~..4...4..4~.~...4...4..~..~...~"4...44.`4.4.~44...4~. ..4--4...4..4..4-..4...4...4..-4..-L.-4...4...4...4.4..4..4...4...4 ....... ~.4...~-.4...4.4.4...L~ ....... ~...~...~...~ ...... ~...~.4.4 ........... L.L* ....... ~...~...~...~... ~-':"'r'~ ..... :"?" :": ...... ," ,"T", .... ," :'"T-t''~ '-T"r'T";" "T"r'T"T ..... r.T-?-t ..... T"T"r"t ....... r"T'T"T- "T"r";-t ....... r"~'T"T'T"T'T"T''? 'T'T"?"t'" ;"r"T'T% ....... t"T-'Y'T ....... r'q-'t'"r-. -4.-4---*-4.---.4,-4.--4--4,,--.-4--4.-4...4-- '-4.-4--4--4-.-~ .-4--4..-4---4 ..... 4--4--4.-4-.-t --4--4--4.-4----..4-4.-4-~ ....... 4-.4.,4---4--4.-4..4--4-4 ...... 4.-.;-,~..4 ...... ;-4 ....... ~ .......... ;--3---; ...... ; ........... ; ....... ;..,4,..; ........... ;.-4-.;-.-4.- -~-~--.,..,.--..~,-,..~-~ .-..~.-~..,..~..4.-~..~..., ~ ~ .,~ ~.., ,-. ,- ~ ~ ~ . ~ ~ .~. ~ .... , ~ .~ , ~. . ' ............. ; ; ' : ' -~-q'"*"~"'i -~"'+"ff"~- '-+-+--Hq---t-'q-'-%-H--~ ...... ~.--Hq.--~'.-~.-k-'Hq---4-.-,.--.F-.H-4-'-HI"-~.-+-q.-.~ ...... +.--Hq.--H~.--H-H+--~ ...... H'H-H-H~.--H.H-H.~ ...... H.Hff...+ ....... ;""k-'+-"~ ...... H-H.;"'; ...... i"-;---H-H- --H.--H-- .-+.-;--4--4--- ..4---4.--4-4-- .-H---f.-4.-- .-4.--4-.4---4 ...... H-4--4 .... :--4..4--+4-.+.-Hf-4 ...... H+.--H f-- -'+--H---; ....... H--+..; ...... 4..4-.4..-4 ..... 4---4.-+-4 ....... +...4.-.;-..f ...... 4..-+--+..-+ ....... -+t'+'?-~'-H--H-"H"H'-~-+?+-4 ...... H-.4--+--~..H--4.--+-[~j-H..H.-4.-??+--"4-H"'t-:~'--f--H-'-F,---H-.-H.--~'.+.-H-'-* ...... H..+.4... ...4...H...+ ..... ;-.H...f ...... -i'ti-T'l"i-t"!"'f" "?'i"i-?i"'t"ffi'" -i'"f"f"t'?'?"f'ti"'-~-!"i"?"t-i"'t'?"t ....... t-'?t"'t"i'"~-t"f"t ....... f'i"i"'f"f'i"i"'f"~ ...... H"i"i ....... i"'t'i-"~ ...... f"f'i"'~ - -~.....~- ..~...'..4..+.- .-4..~..4..~... ,.~.-4..4..4.....4.-4..~..;..-...~...~..4..4..- '~'"r"?'"?"'t-?-?"'T"'?'"' "T"Y"?"'?'" "T"~"T"T ...... r"t"T"T"'r'T"T"'t"'~ ....... Y'T"'T"? ....... ?"'Y'T"T ....... t"'?"'T"'T -14.-.4-4.....4.4..4..4....-4..+.~ ..... ;...4...4...;.4.....4...4..-4...L....~..-~..4..4... ~ ~ ~ ~ i ~ ~ ~ : ~ t ~ ~ ~ ~t ~ ~ ~ : ~ : i ~ ~ ~ ~ i ~ ~ : ~ i ~ : 0 ~ ,ii :I:' :i:i .--,-.,---,-.?--b,--,---,-.~ ...... t--?~.-,--.,.-?-?-.,--?-~..?-?-,--.,---...?-~--?~.--..~..~ C L.r.T..T..~ ..... ?'"?"'r"r"~-'T--r-T'-f.-?--y-?'--T'-'r'T-'r-'t'T' "T'T'T"? ....... r"r"T"'; ....... ?'--r-'T--? ...... r"~-T"?"' -+4-4-4--Fq-.H-+- .-4--4-H4-.-4-.+-q---;-.4---.--4-q---4---} ....... 4.-+.+-+.- .~-~-4-- ..~...;..~..4... ~..~.4..4..4..4..4.4.4... ,.4..4..~...4....-~..4..4..4....~..~..~...~..~...~...~..?.~ ....... ~--+.-~...~---~---~---~--?.~---??~.--~---?.?-?.~.--~-?-..-~..-~-f-.~ ....... ~...+..-~...~ ....... ~..~-.~.--~ ...... ~..-~..?t-- ....... ....... ,.-----, ....... ~..++.+~_ l++.++.,.+.+.+.~ ...... ~---t--?--~-~..+-t-++--.--4-.~¥~--~..+-.?+--+.~ ...... ~-.%t..+-+-+-+-+.+.-k-+.4..+.4...t.--t..+-+..j ...... H+.m..t..-.-+..H.~...+ ...... -i-+..+-+.,44.4..4-;,`:: [~: :' :: : :.-4..4.44..-..-4.4.-L4.... ~...:. : ~ ~: ~: ~: :L; 4..4...L.~.4 ....... L.:..~.~ ~::::: .~ ~t.4..4 ...... L..L.~...L.LL.t.L4.~ t ~ ~ t ~ ~ ~ ~ ~ : ¢ ~ ] ~ ~ ~ ,4"$ ¢4 L.i $4. 4---'--~:~4¢ 4...4 ¢''' ~ ~'''~ ~ J 1000 "~J~JJJ~ JJ4'J[ ~ [ ~ ' JJ~JJ~ Ji~ ~ ] ] ~ .... ; ~mJ~--JJJ]JJ]JJlt J~ ........ t JJJ~J~JJJt JJ't J~lJlt ii'Jilt' / ....... !"~/~'~"J"'¢"~"~"'¢'"[ ~; ~ ~ "~"~"'¢"'?']'"?"?"¢"'~~ ' J ....... t'"tj ......... [ /t"'?"?"t"?'" "~-~ ............ ~ ~ ?'?"'Y'~ : i ...... t"?~ ............. ~ . t ....... j t"'t'" H-+-4-.4 ....... ,.-+-4-+...... 4.JJ4JJJ~jj4 il- ...4.-4.-4-..H4.-4.--4--4-.4.---4.-4.--+h4H---4.-+-4.--4-q--+.4-4.-+--4..4.-.4---;--4 ....... 4.-+.4-..4-.-H4--+.+-.4---...4-.-?H.--.-+-+.-4..4..- ..4...H.--4-.. ;.--4..+.+.-?.-- ZI]E~Z...44..4..~.....4..~..4...~...,..4..4.4_4.....~.--~...~.--H.4..-;..~..-~ ....... ~...~...~..~-.4...~..~...;..-~...~...~-..~...~..-H...~...~...~.4 ....... ~...~...~...~...~.4-.~..4...~ ...... ~..4...¢.4 ....... ;....~..4...~ ...... ,4-.4-4.4 ' ................... ' ~ ................ ' .... ~ ~ : ~ : : ~ : : ]~!~ ..-4... : ..i T ~ i: .4 ....... ¢..4.-.:...¢]~i...... ~[i:"'¢"'¢"4....... ;...:..4..4...L.4.4--4...~~~ ~ ~ / i ~ i i........ [ J ] '- ~J ,~ ~ ~ ~;'"¢"'~"~"["'~ ...... ~-.4-.4.-.~-,.~.-4.--¢---~--.~~ ] ~ ~ j ~ [ j ~ ...... ¢ J J J ~ J J J~ J J J ,~ J J J 4 J J J ~ J 1J; J i J ~ J J J~ ~ ~ i ] J ~ ~ ~ ~ .............. ~ ~ J ] : ~ ~ ~ ~~ ........... ~ ........ ~ J J J ~ .......................... ! ! 1 ! ..4...,..~..~.-...~..~..~...~......4...~.-4-4 ....... ~..4..4-.4..-~.-~...~.-~.-~ ........ b.4.-4...~..~...,.-.~.-4...~ ...... ~..4-.4..4..4..-.b..,..4..-~ ...... ~..4...~...~....~....b..~...i ........... ~...~...~...~.....4...~..4..4 ....... ,...~...~...~ ....... i.-H.~-.-~ .... ..t...?.~.-.t .... Z:'TZT3Z"~'"~"~ .... ,'","',---,",-'-,----',--, ....... +-'+-+'-+ ....... ~"-+--+--+ ....... ,---,---,'--,-'-"'-,'",---, ....... ~"+--~'-+""-+'+--~"'~ ....... +-'+-+'+--b-~-"*'-+'-~ ...... ,.-?---t-.+ ...... +..-+--+-~ ....... r--,.-m.?-'--~ ....... r"r"~"'*"T"??""?"?"?'"~ .......?'-r"~ .......... ~ ....... ~ ....... t ....... ~ ................................................................... ;3 ....... ~ ....... ~...~...;....~...+...; ....... ;...;....~...; ........ '-'J-'~"J-'~"" "T"t"~'"t ..... ."?'t- . ...... r.-t---t.r ....... t.--?.t.-.~ ....... ?-t---t.-.?.--~ --.?---t..-t,--t "T"t'l'"~""~ ........ ~"~-?'t ...... t---r-.t---t ....... t-'-t""r--t"-t"t'--?r-', ...... t""r'-'r-'t"-r.-t--"~".'k-"~ ........ r"r"?'-, ....... r"r"r"r-' ...... L.~..4......4-4..~..- ..4.-4.4.,4..- ..4-~..4-..L....4-,.~.4.-4..~ -4..4-L.4.-4..4...~4..4 ...... ~..4-4.-.~ ...... ~..4...~-.4 ....... ~..4...&.~...t..&4...&.~ ...... ;..4..4...&.L4..4.-4-4 ...... 4...L4...~ ...... ~..4-L..~... H"i-H-' ]"TTT'"'??"?"?-r'*"~-r'~"~"'??'? ...... t---r--?-?.4.--~-.-, ...... ~ ...... y.?"?.-¢---4"-r--4"¥--w' '-'-~"-?--?'?4'-'?r-'r'-t ...... ?r'-??"-t"'r'-?--'?: ............... r"* ....... : ....... t.--t ........... ..... . ......................... ~ ........... . ................... , ........... ~ ...... ~............4 ...... 4 ........... ~::]~,..~ ............ ~..~ .................................. ; .............................................................................. ; ............... · "t"'~'*'t"? ........ ~"'t"'~"*~ ........ r"~"'H't'-1 '*"}"'~'"t""~ ...... ?'4'"-?'"k-*~ "'~'-*'}"-'?'-} ...... f""?"H"?"~"'H'*?'"~'~'~ *'-?"?'"?'"?'-~""?"f'"'k"~ ....... k-'k'"?'"?"l""}""~'-'~'"'} ....... f" 'k"~ 4 .......... ?...}....} ...... ~....~...~.-.~...~,..~..~....~ ..~..- -'~"'.-? ...... ~"?'-~"~'*~ '-?-*-~'-~--?'- .-~--e,-~e.--?-- --~.~.--~-? ...... ~---~-~.-~ ...... ~"~'-t"'~ ...... ~"?"'~"'~ .......... e---~---e ...... e-.?--~.-.~ ...... ~',.~.'-~'-'e ...... ?"t"'T'? ....... ~'."~'--e.*.~ ...... ~"'T"'~"'~ ....... ~"'~"'t"'~ ...... ....... ...... ....... ...... ........ ; ....... _..., ...... _..._ ....... ........... ...... ...... ,... '"~" ~'?"?"~"~'"?'?'t'~ "'?"?'~"'t ...... ~"~"'?"?' "?"~"?'"? ..... t'"?~"?"' "~"?"?'"~ ....... ~'"~'"~"'~ ....... ~"'."?'"~ ...... ?'"t"?"'t ...... ?"'*'"~"'* ...... ?"~'"~"'~ ....... ~"'~"'~"'* ...... ?'"?'"?"'? ....... *"'*"'?'"?"'~ "'t"'t"'t"'t'- .... ~...m ............. ~...~ ....... ~ .......................... ~ .............................................................................................................. ....... '~ ·. .......... ~.q.~ . ~-~ ~ ~ ....... ~ ...... ~ ~ ~ ....... :~ ~ ~ ........ ~ ~ ~ ~ ~ ~ ....... ~ ~ · ~ ~ ........ ~ .......~ ~ ~ ........ ~ ~ ~ ~ ~. ;'"~ ,'",'"',",","',"'?'-, ~""~"?'~ ,"'?"T'"r"?r"?"T""~ T'"?"?"? n""b.~"r~a~:~ ??x"",""r'"?"?r ~""~""~'"? ~""?'?""r ~""~""~'";'~'"?'F" ...... ....... _..., ....... ....... ....... ....... ...... ....... ....... ....... "T ,"',"'. ....... r"T"'Y'Yq'"t'"T"'T'"t ...... T"'T"'t'"~ ...... ~"'H'T'"~ ...... ?"t'"??"~'"T"'Y'T"'T ....... t'"T"T"? ........ ~"'~"'?'", ..... ~'~ i '~ ...... T","'?'"'~'"y'Y'Y'"~"'? ....... Y'T'T"? ...... T"'~"'~"'? ....... ~_41.~..~--~--i---H.~ ...... i...i..4.~.....~4-i..4-...4..~...~..L., b.4...i~4...i ....... ~.-4-H-H~-*.-.~...9.-~ ....... H'H-H'H-~---H'H-'k'-~ ....... ~'--H'H+--~"-H'H'H-~ ....... ~--.-h--H-~ ....... H.H.H.-~ ...... Hff-..H.~ ..... i-'.~"-~"'~ .... . ~ ~ i : ~ ~ [ ....i.i i . : .~ : ...... · .... ~ ' / ................ -~i--.~-~-...-~.-4-.4--i ...... &-4--4--4.--i.-4- --~ ....... 4---*---*---*-.-.-~---*-.-*---* ...... ,...,...?, ...... ~--?..4.-.~ ....... Hff"'H'~ ...... H'~'"~""~ ....... ~"ff'"H'~ ....... ~'l'~'"'F"l~ ...... ~.-..b"~.--~ ....... ~""i'"~"'~ ....... ~"'~"'~'"~ ...... ~"'t"'H'~ -.L., j,~-.~-4 ..... ~L4..!~..4 .... ~ ~ , , ~i.4.-.L4-;..~-4...i.4...~ ..... ...~...i..~...~ ;..4...~..4...4~, ~ , ....... ,...~...~...~,~ ~..f..~ ~ ~ ~L..L4.4 ........ L4.4...i~~~L4.4....i .... ....... L.L...i...~, ...... ~L..L...L4 ....... L...i.4...i~ ....... L4...L..i~ ...... i...i...i-.i~ ....... l...L..i...i~, .... +H.-.~ ..... H.-H..-.H.H--.-+H.-+.-.-+H----~ ....... HH ........ bFH~--H---~ ....... H-..H-'-f'-'H'-H ....... ~q..-.H.--~.--.H...-H ........ ~....H.--~ ........ ~...-b~ .-~. -~ooo '..H-..f--f..:--H...H ..... H.--H ...... H---f-i ........ H..-H ....... H-.-H ........ H'---H'-i---f--'H--'f-'-i"--~"'f--f'"?'-j""f'-'-~-'?"-'~ ........ f-'f"-~'"ki""N'-"~-'"~ ........ ff'~""H"i'"k"~'"H k'~" ~'~"'j'"~:"!""~"~"- -~000 -2000 - 1000 0 1000 Z000 3000 4000 SOO0 NEST EAST WELL" (507' · 1,L*' 18 --~ FNL, 143' FEL, SEC' ~, TllN, RIOE) -~'~,VERTICAL PROJECTION -2000 - ]000 0 0 ]000 2000 5000 4000 SO00 6000 L..~..~_L.~_~-~_.~...~.~... :..~...~...~..~ L~. ~-~ -~--~-~-4 ...... ~-~...~...~ ...... ~.-~...~...~...~...~..-~...~.-.~...~ i I ~ ~ ~..:-.~...~ ........ L.~...~...~...I...~...~..4...~ ....... ~...~ ..4..4...*...~...~.-4...*...~..4--. .... ~---+--+~-t-+-+.+-~-,,--.~--~-~--~-+.-+.-~ ...... +4-+-+ .... ~-~--+--, ...... +"+"~'"+"'t'+'+'+--+ ...... +"-+-'-~'"~'--f'-+--'+-+--+ ...... +"+'+"~ ...... +"+"+"~ ....... ~"+-'+'"+ ...... ~"-+"'+--~"' ..+..~-++. · .~-.+.4-~ ....... t-4..4...L...-~-.L4-4.--~.t...L..L..~--~...L..L..~ ..... ~...t4...t..-..4..4-4...t-.~...t..4..4-.t-.~.4...L..t...L....~...L..L..L.-~..4.4...~...t ...... ;...t..4...t ....... ~...~...~...~...~...t...:...~...t ...... ~...:...~...~... -4..4-4.4--4.4-~-~ ...... ,.~.--~.-:--M-4-4-4.4.4 ....... ~...~...~--~ ..... ~.4.4.4...~.4.4.4-4...~.4.4.4...~-.- .4.4.4.4...~.4.4.4.4 ....... ~..4..4-¢ ....... t...~...~...~...~...~..4...~...~ ...... ~..-M .... 1---i-.-4...} ...... 4-4--4-4 ...... ..... 4--4-.-,.--4---.-4-4-4-4 ...... ...... ....... :-4-4-h+--:-4---f-+-4-.-4-4-~--4 ....... ~--4-~--4 ..... ~---~--F--~ h.f-4--4---.-4~-.-f-4~ -4-4...t...t...~...t...t.-.t...t ...... t...t..4-~ ....... t...t...t...~ ...... t...~...~...~ ....... ~...t..-t...~ ...... t...t...L..t ....... t...t...~...t-, t, ~, , ............... ~ ............. --~:~-'~ .................... t,,, ....~...~.4...~ .... ....... ~---~--~-- ,--~.-.~-.~-.~ ....... ~---~.-.~--~ ..... +---~..-~..-* ....... *-.-~---*-~ ..... *.--*-.~-~.--~ -.-~.--+--.~.--*---~ ---t-.~.--~--.~-- --~--~ .... * ..... ~--~-.-*-.-~ ....... ~..-~.--~.4 ....... ~-..~-..~.--~ ....... *...~-.-~--.~ ....... *--.~,.-~.-.~ ....... ...... ....... ....... ,--~.-.~--4--4-.---4-4---*-.4 ...... ~-.-~..4--~--.--4..4~ ...... ~.-4.-4-4--~ .--~..4.--~-.4 ...... ~.-4---~--4 ....... ~.-4---~..4 ...... 4.-4--4---~ ....... ~--4.-4.--~ ....... ~--~-.4.-.~ ....... ~.-4..4,--4 ...... ~...~...~...~... h..~..4...~,.-4 .4-4..4.-+.-.--4-t--+.i---+.-~..-t---+ ...... 3'-'~ ..... t-4.--f--+-+-+--e4-4 ...... ~--4.--~-4---:-4--4-4-4-.-.-.4..4-4---~ ....... 44.4.4 ....... ~--.4-4---~ ....... h.4-..t.--4 ...... ~.-+-+4--.~.-+.-t..-t.-.4 ...... ¢"+"t"3 ....... 3"'4'"t"'t" --~-.4.-4--~--..--~.-4-~-~ ...... ~-.-~-~---~-~-~---~-.~-.~.~--.~---~---~-~---~-~.--~-..~--~ ...... 4-.4-.4-~ ....... ~-4--~.-4 ....... ~-.~-~-4--., .-4-,~-.-,--4 ....... ~...~..4...4 ...... ~..4--.~...~ ...... ~...4..4...~ ....... ~...~...~.,-4 ...... ~-..~..4...~ ....... ~--4...~..-~..- -~ ............ ~ ....... ~ ..... ~ ....... ~ ..... ~ ........ ~ .... ~ .......................................................................................... ~ ......... ~ ............................... ~ ...................... ~ .............................. ~...~ ...................... ~... ..... ~..+.+.-. -.+.-~--+.~ ...... ~--.~---~---~...f..~..+..~...-~ ...... ~...~...~...~ ...... ~--+-.~...~ ....... ~-4...~...~ ....... ~..+..~..-~ ...... ~..+.+..~ ....... ~"-~'"~"-~--~ "+'+-+'+"~ '--~'-'~"+'-~ ...... ~"-~"+-'~ ....... ~'--~'"~"'~ ....... ~'"¥'~"'~'"~ '"i"+"~"+- -~-~-.4--4I:ii ~i~i ....... ~"'~"'~"~ ...... ~--.~.-4--~ ~ i ~ ~ [ ~ ~ ...... ~"'~'"~"'~ ...... ~..-~---~---~---~-.-~---~--4---~ i ~ i ~ ~ i ~ i ...... ~'"~"'~'"~: ~ i i ....... ~'"~"'~-'~ ~ ~ ~ i ....... ~--~---4--~. i ~ ~ ~ ~ ~ ~ : ...... ~"'~"'~"'~ ...... ~---~.--~.-.~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ...... ~...~...~---4 ....... ~"'~-~"'~. i ~ f ~ ~ ~ ~ ~ ...... 4...~...~ ........... 4.,.~..-~..-.~ ~ ~ t ~ ~ ~ ~ ~ f ...... ~"'*'"t'"~ ...L.~..4.-L.. -4,.~..4..4 ...... ~.-.~-4..4-.. ~...~...~..~..4 ..... ~.-.~--~.-4 ....... ~...~.-4-..~ ...... ~...~..4...~ ....... ~...~...~..4 ....... ~-.-L.4-.4...~ ..-~..4...~...~ ...... L..~...~.--~ ....... ~...~...~...~ ....... ~....~..4...~ ....... ~....~..4....~ ....... ~....~...~...~ ........ ~....~...~....~ · -.~ -+.-*.4.4--~.--:---i---~ ....... ~'--~'.-*-~ ..... ~.--i--~---i ..... ~'"~'-~'--~'",-'~"'~'-i'-~--~ ---~--'~---~---~ ..... ~---+'--~-'-~ ....... ~'-+--~'--~ ....... ~---~'"~'-'~ ....... :'-'~"'~'"74'"~"': -'~'"~ ....... ~--'~'..~..-v-' r":'"+' "~'"~ ....... :'"+"'~"':"'J'"~ "'~ "'~'"~"' PROJECTION ON VERTICAL PLANE 161. - :~41. SCALED IN VERTICAL DEPTHS HORIZ SCALE = 1/1000 IN/FT AOGCC GEOLOGICAL MATERIALS INVENTORY LIST PERMIT 8 Ct l -- ~ WELL NAME ~ IK,~2,U~ | L.-- t~ COMPLETION DATE "~ / r~ t_~ I ___ co. CONTACT ~~::) . -: Check off or list dat~ as it' is recei¥cd.*liSt received date for 407. if not ~eq,u,!,rcd list as ,o~I*~Jq'J9 1 ,., drillin~"histo~ '~ 'suweY] [ t" well tests ' ~ ] core descr,iptiOd~ cored inle~a~s , C°re ~nal~sis ~' d?,ditch intewals dleital data .... ~ ~ ~O~ ~ ~ , ~~ ,, ~~ , .... ii j i i i i i i ii ii ii I i i ii ii i i ii I i i i i i I i iiilU i i i i ~ i i j LOG TYPE RUN INTERVALS SCALE ............ NO. (to the nearest foot) ....{inchl100'),, ',1 ~:~ ........ l , , ~, ,~,,- "?~7~,-' 5. ~ ~ ~ ...... I ...... I ~0 -- ~7~ i i i 4} C~I~ ~ i i i I 17t00'-7~7¢ , ~ '"q" ('~~ .... I ,,,?t~o~ 7~~ , ,,S ,, i iii ii ii ii ii i i _ . Ill I Ill II I iI i t , I i ' II I IL i i i i i i i J ~i ........................... ~ ii i ~LI IIUI I Id I Jll I . L . I .llLI Jt JJI ti I Jtl q[ I Jl.I I I I J Il I JL I t~L ...... ~ , . , L. I lULL . L . _1 .L J . I U_II I L klJ ~J ..... I I . , ............. , 1~ I i llll II Ill III I Ill I Il I I J] I Iii lllll I I Il I I Ill' I I Il I llll III~II ~II I I~ ~ ....... ii i I I ii iii iii ~i iiii I iiii i I II III I iii I i I i i TO: THRU: MEMORANDUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnie C. Smi DATE: July 16, !991 Comm is s ioner . FILE NO: HH716 - 2 TELEPHONE NO: SUBJECT: BOP Tests AAI KRU DS 1L-18 Permit No. 91-35 Kuparuk Rv Field FROM: Harold R. Hawkins Petroleum InspectOr Tuesday Jul¥.10.. 5991: I witnessed a BOP test at AAI KRU DS 1L-18. There were no failures. I filled out an AOGCC field report which is attached. The spindle that holds the upper kelly was sent out for repairs. Upper kelly was not tested. In summary- The BOP tests for AAI KRU DS 1L-18 on Nordic rig #1 was satisfactorily performed with the exception of the upper kelly. Attachment. 02-001A (Rev. 6/89) 20/ll/MEMO1.PM3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report OPERATION: Drl Operator Location: Sec ? / T,///// Drlg contrctrj , Location (general) ttousekeeptng (general} Reserve pi~. ~/ , R~) M Well sign MUD SYSTEMS: Trip tank Pit gauge Flow monitor' // Gas detectors Vi sual Audi o I I I I TEST: Initial Weekly , Other Representative Permit'# ?/ ~ Casing set ~ ~?~ ft Rig#, ~ Rep_ · ACCUHU~TOR Full charge pressure ,7/~ " pslg Press after closure ~~ pstg Pump tncr clos press 200 pstg _~_~_~mtn ,--- sec Full charge press attained ~'_~mtn ----- sec , Controlst Naster Remote / BOPE STACK: Annular preventer Pipe rams Blind rams Choke line valves HCR valve Kill line valves Check valve KELLY AND FLOOR SAFETY VALVES: " Upper Kelly Test pressure~ Test Pressure Lower Kelly Test pressure ~~.~ Ball type Test pressure ~P Inside BOP Test pressure -~0 ~ ~ Choke manifold Test pressure ~->~ Number valves /~ ~/=m .~ ~ ~ ~ Number flanges ,~ 3 ~ ~ p Adjustable chokes 7-~e./~ Hydraulically operated choke dt.x_/~,, TEST RESULTS: Failures /~,'~,/."~ Test time Repair or replacement of failed equipment to be made within ~ ~..days. Nottfy · the Inspectors and follow with wrttten/FAXed verification to Commission office, Distribution: ortg - AOGCC c - Operator c - Supervisor C.OOq (rev 05/10/90) WITNESS ARCO Alaska, Inc. Date: June 7, 1991 Transmittal #: 8125 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. -~ L-14 Cll.?~~- 2M-16 ql" '~j 1L-20X Directional Survey Directional Survey Directional Survey Directional Survey Receipt Acknowledged: 5- 1 2-91 74592 5- 1 0-91 74584 5- 1 8-9 1 74583 5-13-9 1 74588 D~te: D&M State of Alaska Naska 0it & Bas Guns. uomrnissi0n ARCO Alaska, Inc. Date: May 17, 1991 Transmittal #: 8100 RETURN TO: ARCO Alaska, Inc. ATTN: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 1L-18 ~-..Geochemical Log 5-10-91 7100-7693 1 L- 1 8 ~Cement Evaluation Log 5 - 1 0 - 9 1 6 0 0 0 - 7 6 9 8 1 L- 1 8 "'-Cased Hole Density 5 - 1 1 - 91 71 0 0 - 7 7 01 1L-18 -Cement Bond Log 5-10-91 6000-7675 1 L- 1 8 ~ Compensated Neutron Log 5 - 1 1 - 91 71 0 0 - 7 6 7 6 Acknowledge' ~]-i'[~[~, J!~i~-~- ..... Date' Receipt Drilling State of Alaska(+sepia) ARCO Alaska, Inc. Date: March 27, 1991 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmittal #: 8052 Transmitted here with are the following Open hole items. Please acknowledge receipt and return one signed copy of this transmittal. I L-18 Gamma Ray (2") 3-22-91 100-6574 1 L-18 Gamma Ray (5") 3-22-91 1 00-6574 Receipt Acknowledged' ~~----~ .... Date' - ......... DISTRIBUTION: D&M Drilling Franzen Vendor Package(Johnston) NSK State of Alaska(+Sepia) ALASKA OIL AND GAS CONSERVATION COMMISSION March 5, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 .A.W. McBride Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 re: Kuparuk River Unit 1L-18 ARCO Alaska, Inc. Permit No. 91-35 Sur. Loc. 507'FNL, 143'FEL, Sec. 31, TllN, R10E, UM Btmhole Loc.4289'FNL, 4110'FEL, Sec. 32, TllN, R10E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. ..The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Sincerel~ , David W. Chairman Alaska' Oi Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.O05 ! la. Type of Work Drill X Redrill -- I lb. Type of Well Exploratory~ Stratigraphic Test -- Development Oil _X Re-Entry _ Deepen --I Service _ Development Gas ~ Single Zone X Multiple Zone 2.. Name of Operator 5.Datum Elevation (DF or KB) 10. Fielc~ and Pool ARCO Alaska, In(;:, RKB 130, Pad 87' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25659 ALK 2585 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 507' FNL, 143' FEL, Sec. 31, T11N, R10E, UM KuDaruk River Unit Statewide At top of productive interval (TARGET) 8. Well number , Number 3,974' FNL, 4,219' FEL, Sec. 32, T11N, R10E, UM 1L-18 #U630610 At total depth 9. Approximate spud date Amount 4,289' FNL, 4,110' FEL, Sec. 32, T11N, R10E, UM 03-12-91 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 1 L-1 4 7,809' MD 991' @ TD feet 60' at SURFACE feet 2560 6,325' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 1200 feet Maximum h01e an~lle 42° Maximum sudace 2,113 pslg At total depth (TVD) 6,325 3,322 pstg 18. Casing program Setting Depth size specification .. Top Bottom Quantity, ol cement Hole Casin~l Weight Grade Coupling Length IVD TVD IVD TVD linclude sta~e dataI 24 16.0" 62.5# H-40 Weld 80' 35' 35' 115' 115' ~200CF 12.25 9.625" 36.0# J-55 BTC 4,079' 35' 35' 4,079' 3,570 800 Sx Permafrost E & HF-ERW' 500 SX Class G .. 8.5 7" 26.0# J-55 BTCmod 4,079' 35' 35' 4,079' 3,570' 200.SxClassG 8.5 7" 26.0# J-55 BTC 3,730' 4,079 3570 7,809' 6,325' Top 500' above Kuparuk 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured, feet Plugs (measured) true vertical feet !. Effective depth: measured feet Junk (measured .true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor !nrUt~fedra~mc~eidoinat° 'R E C EI V E D Liner Perforation depth: measured FEB 2 8 1991 .: true vertical~ ~' *'"' ~,--~- --- 20. Attachments Filing fee _~L Property plat __ BOP Sketch ..[. DiVerter Sketch ~ Drilling pr~r'~.G~0[a..~, Drilling fluid program ~ Time vs depth plot -- Refraction analysis _ Seabed report _ 20 AAC 25.050 requirements 21. I hereby certify that the loregoing is true and correct to the best of my knowledge Signed .,/~J/~~~,~ ~ Title Area Drilling Engineer Date Commission Use Only "'Permit Number IAPl number I Approv.a' dat.e J See cover letter for ~/~- ,~ so- C~ Z ? - .2_ 2. / ~'.5' 0 3 / 0 5 / 91 other requirements Conditions of approval Samples required __Ye s ,~ N o Mud log required__ Ye s ~. N o Hydrogen sulfide measures__ Yes ~. N o Directional survey required ~ Yes __ N o Required working pressure for BOPE __2M; ~ 3 M' __ 5M' __ 1 0M' __ 1 5 M Other: ~ by order of ~Approv~ Commissioner the commission Dui Form 10-401 Rev. 7-24-8 Sub~ ~it in triplicate Field : Kuparuk River Unit Location : North Slope, Alas o · ·400 ~oo - _ 1200- _ ('- 1600- CL - (],.) 2000- - 2400- 0 - (~ 2800- "-I-- ~ - ~ 3200- ~ ~ooi ~ 4000- _ ~ 4400- _ 52~- 5600 - GO00 - 6400- IrreOted by : jones For: M PRESTRIDGE ate plotted : 17-Jan-91 lot Reference ~s 18 Version J5. oordinates are in feet reference slot t18. ue Vertical Depths are reference wellhead. i-TJ~I~EASTMA N [Z/~UC HRISTENS EN Surface Location: 507' FNL, 14-3' FEL Sec. 31, T11N, RIOE .......... East -- > 0 250 500 750 1000 1250 1500 S 19 DEG 9 MINE 5670' (TO TARGET) RKB ELEVATION: 1,30' KOP Tvd= 1200 Tmd= 1200 Dep=O TARGET Tvd =5960 6.00 Tmd=7315 12.00 B/ Permafrost Tvd=1520 Trade1522 Dep=27 ~uu,,, .~o~:~136~7'~7 \ \ 18.00 East 1204 ~ 2 ~'00.%0 Build 5 Decj/lO0 k 56.00 T/ Ugnu Snds Tvd=2350 Tmd:2409 Dep=370 397T~,R%%LL%T~°,n"FEL 1 42.00 EOC Tvd=2488 Trod=2615 Dep=500 . T/ W Sok Snds Tvd=2890 Trod=3158 Dep=867 . B/ W Sak Snds Tvd=5570 Trod=S808 Dep=1305 9 ~ 14-10 Tvd=3850 Tmd=4455 Dep=1743 ~ 1~289' FNL, 4~0' FELl AVERAGE ANGLE 42 DEC; 24 MIN ~. ~-s ~v~=Slss Tm~=~S P~p=29SS ~ TAROET - T/ Zone C ~ Tvd=5960 Tmd=75~$ Dep=~670 -- ~ B/ Kup Snds Tvd=6177 Tmd=7609 Dep=5868 ~ TD - Loggin9 Pt Tvd=6325 Trod=7809 Dep=4003 i i I I I i I i i i i i i i i i i i i i i i i 0 400 800 1200 1600 2000 2400 2800 .32003600 4000 4400 Scale 1 ' 200.00 Vedlcal Section on 160.85 ozlmuih wifh referenae 0.00 N, 0.00 E from sial #18 o Q 250 . . 500 o 750 looo _ -1250 - -1500 0 _ -1750 - D'- -2000 2250 -2500 V _ -2750 _ -3000 - -3250 -3500 37 0 - 5 300 250 I I 200 1 50 100 50 I I I I 300 400 450 500 550 600 650 700 I 300 / / / 4300 I 300 I 300 ~oo ,.,;o~oOO , I I / 3900 ,, ./ 300 / / 1700 / , 700 / ' ! / V.~;u ~.oo' '~ 1_900 I f 21 O0 300 / ~ / ~ ~,1_00 / ~ / / / ~ ~700 ~ 2300 ~ ~ ~30 / / / / ~ 1 eO0 / ~EB 2 8 1991 j asoo / ~ J , ....... , 250 200 150 100 50 0 _300 _ 350 _ 400 450 500 55O 6O0 65O .7OO DRILLING FLUID PROGRAM (1L-18) Spud to 9-5/8" surface casing Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids 8.6-10.0 15-35 15-35 50-100' 5-15 15-40 10-12 9-10 10% _ Drill out to weight up 8.6-9.3 5-15 5-8 30-40 2-4 4-8 8-10 8.5-9 4-7% Drilling Fluid System: Tandem B~andt Shale Shakers Tandem Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuge, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD 10.1 10-18 8-12 35-50 2-4 4-8 4-5 9.0-9.5 <10-12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 2,113 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3,000 psi. The nearest well to 1L-18 is 1 L-14. As designed, the minimum distance between the two wells would be 60' at surface. The wells would diverge from that point. Excess non-hazardous fluids developed from well operations and those fluids necessary to control the fluid level in reserve pits will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 175 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 1L-18 , . . . . . . . , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Move in and rig up Pool Rig 7. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (4,079') according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2,000 psi. Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Ddll 8-1/2" hole to logging point (7,809') according to directional plan. Run open hole evaluation logs. Run and cement 7" casing. Pressure test to 3,500 psi. ND BOPE and install temporary production tree. Secure well and release drilling rig. Run cased hole cement evaluation and gyro logs. Move in and rig up Nordic Rig 1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Change over to diesel. Shut in and secure well. Clean location and release rig. Fracture stimulate well. Reperforate and add additional perfs. K,.,PARUK RIVER UNIT 20" DIVERTER SCHEMATIC 5 HCR I 6 4 3 DO NOT SHUT IN WELL UNDER ANY CIRCUMSTANCES MAINTENANCE & OPERATION UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(B) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD 3. FMC DIVERTER ASSEMBLY WITH TWO 2-1/16"- 2000 PSI BALL VALVES 4. 20" - 2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20" - 2000 PSI ANNULAR PREVENTER SRE ~6~0 7 ,6 , 5 4 13 5/8" 5000 BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAUUC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTORAND MANUAL KILLAND CHOKE LINE VALVES. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILLAND CHOKE LINES. 6. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. 7. CONTINUE TESTING AL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3000 PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JTAND PULL OUTOF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10 OPEN BLIND RAMSAND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND UNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16" - 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5000 PSI SPACER SPOOL 4. 13-5/8" - 5000 PSI PIPE RAMS 5. 13-5/8" - 5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5000 PSI ANNULAR SRE 8/22/89 DOYON 14 CHECK LIST for PE ITS ITEM APPROVE DATE (1) tee , fC 1. (2) Loc thru 8) (3) mdmin ~_ ,~/~q/~t 9. '('9 thru 13) 10. (10 and 13). 12. 13. (4) Casg ~.~.~. (14 thru 22) 14. 15. (23 thru 28) Company ~z-~o Lease & Well No. ~.~ ~_5-~ ~-~ ~ ~R~ YES NO RRMARKS Is the permit fee attached .......................................... T -- 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. 'Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is conductor string provided ........................................ ,~ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................ ~,~ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~~ psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (6) OTHER ~ ~T~/ thr~ 31~ (6) Add: /~.~. ,~-/-?/ Geology: En~,ineerin~: DW3~' LCS / BEW~ rev: 11/30/90 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. Additional Re~arks: INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE O ~ O Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ****************************** ~'blt]~bercer ~.lasKa Co!~'~put. iDq Center O~ I G I' t.~ ~ Fi, lC. TAF~ NAN~ : 74564 S[~v!CE : VEF:S I0~9 : OO 11~.06 Dh'IF : 91105117 ~X REC 5IZ? : !024 FI'!.,,E TYPE : bO L~ST FIL~': PAGE: IS Ta~e Veri, ficat, ion Listir,~q rhlumberser Al. aska COmpUting Cer~t:er PAGE: ELgV2~IO~S T~ LOGGER: 129 0 N g 770{) 7704 7" 26 I.,5 ~ DRILLE:¥{' DEPTH OF 0 TO 77R9 M L.()T 20 CNC-GA 65 VIA SOFT~,~ARE TH~] ~'v wAS FIXED FRO'VIDICG ,a '~b;~PORARY INTER~ITTEt.~T FIX, ~,/'TH THE C[:¢~,~I;NATIf)N UF THE TRREE PhSSE;S ~E ESSE, t.~T.[AL[,y HAVE TwO "C[)~'~PL~:TE PASSES", D~T[: JOb dOE REP"ERENCE ~;0: 74564 L¢'P/~'A: S, DEES ****************************************************************************** is Ta~.~e Verification bistino ~h!umber~er A!.aska CO,mDt.]tinQ Center PAGE: 3 N~TT L, ,! T I W pDAT !.,~ F APg T D P i:L! IL1 D F T [?FPN R~CS STK~/ FT FT FT 4,,22595 130° 130. ~7. 7700. 7704. 770!. 7100. n K !' t:,~ E !0.6 STRATTO~! -999.25 F E L TYPE ~.~e 1 i aame AP! Serial Number Fie,id Location Section Ta:~ushl~ County State or Province ~qat.ton Lati, ttide bor~gitude ~J tness' Service Order Number Permanent Oatum ~:].evation o~ Perm. boq ~easured A~-:,[)VZ PERMAgE~'.~'[ OAYU~4 ~:]evatlon of Ke.iIV Flevatio~ o~ OerricK ~:levatio~ oi Ground Total DePth - Total Depth - Loqqer ~:cttom l~oq Interval 1nm Log Interval O~illlnq Fluid D~illinq Fluid Densit l:,rillir, q Flotd Ph !.)ri l, lina Fluld Vlscos Pri!.!inQ Fluid bOSS Resistivity ~ud 5amole 'Temperattir Resistivity of mum ~:..~..~ ~'iltrate Sample Resistivity of :~'od Ca ~v,t.)n Cake San;pie Tempe ,qt; r' f, a ce TemFerature ~%ottom '~ole Te~peratu ZO,;4 E IS ?ace Veriftcatt,.J, or~ List!no .-hlumberqer AlasKa Comp!.~tlJ,~.q Center PhGE: 4 TYPE I CURV DEPT E ~ P H CFEC RCEF PCE~ NPHI TN pF TNFA RC~,~ T RCFT CFTC G¢ C~t,l CCI, FEFI.: PEFS LS ~ 4 88~: 1 Oept. Channel Ep!.tnermal ~;~eutron Porosity Callorate<~ ~i?pit. hermal Neutron Ratio Corrected Far Epit~ermal Counts Corrected Near kpitBerma!. Counts R~%,: Corrected FDltherma] Far Counts Raw Corrected ~.:pit~erma] ;~esr cour~ts Neut ro~ Porosity Thermal ~,~etltron Porosity Ca!it)rated Thermal /',;eutron Ratio Pa~ Thermal ~,eutron ~atio t,2eutron Poros!ty out¢~ut Froth ~.in Ar,~ltcst, lo~ Proqra~. RCbT RCFT C~TC (;amma Ce i j. ner 'rensi~r, (TCL Ar,~plitu,d~ bo~q Sraci~q F'k~f)Y~ (!lncorrected) ShOrt Spact~q F;ulK Oepsity P 6; F' L PFFS Photoe3. ectric Factor L S v~ 1. LSd'2 [~SW 3 L S ¢, .4 SSW2 I'M ?;a~e verification bist:inc~ chlumber<!'er AlaSk~ Co. mg!it~ Center ** SET TYDV ,- CHgb~ ** "F' APl o .:.R V {1 ¢~ CF~ A APl ~.~ ....... [)~D[fR ~ bt'3(; TYPE CLASS .................................... F'* 9 n 0 r} () <) 0 ! 1 4 0000 O . . ,., . .. . - CN I 9[3 422595 O0 OC,~O (>0 (-: i 1 I. 4 68 0000000000 F;?.,;RA, C~'~I 422595 CFSC Chi CPS 422595 Cb/KC C~:I CPS 422595 DC~-:~' C~I CPS 42~595 RCE:t,; C~I CPS 42~505 NPHI (7'~1 Pd 422595 7~:PP C¢;1 P~..~ 4225q5 T/~Pfi Cb:l 422595 i8 ?or,:~e verJ, fieatJon !,.istino chlumberger ^l...as~o Co!nPutin~ (:enter' PA ,,g: i~T'N~ C;~I 422595 OO 0 ~PO~ C ;'," ~ p~! 422595 nO 000 O0 0 RC~;T CF.~! C,.P~_ 422595 no 000 O0 0 ~CFT CN1 CPg 422595 O0 000 O0 0 C~TC C ~ 1. CPS 422595 OO OOC Off CF'TC C~,~1 CPS .422595 G~ CN! GAPI 422595 O0 000 O0 0 ' 4 ~ 2595 0 C C L C ~',~ ! V ~ 22595 00 000 00 0 ~ ~' S '7 00 0 LSR~4 HLI G/C3 .:22)95 ,,,.) O00 8SPF ~'~I.,l G/C3 422595 O0 000 09 0 p E: F' L i! t... 1 { 22595 (} 0 000 00 0 PEFa HLI ~2595 p E F H I, 1, 422595 00 o 00 00 0 LSw1 Hb! CP,S 422595 O0 0 LSd2 ~LI CPS 422595 (:~0 0o0 ~0 0 L5~3 HL1 CPS 422595 0,.~ OOO O0 0 LEW4 ~LI CPS 422595 O0 t) O0 O0 0 L S v; 5 H !., 1 C P 5 42:2595 00 000 00 0 88w1 HL! CPS 422595 O0 000 O0 0 S S ~ 2 ~ L 1 C ~ ~ 4 ' 0 ~.o .22595 O0 0~ O0 - 88w3 HLI C~S 422595 O0 000 nO SSW4 HL1 CPS 422595 O0 000 SSW5 HL1 CPS 422595 O0 000 OU 0 RFiOP HL! G/C] 4..2._2595 O0 000 O0 D P [.:i 0 ~t b ~ C t C 3 4, 22595 00 00 (.5~ C, 0 0 C8 ~L! ~'f~q~t 422595 oo OOO O0 0 TE:NS HL1 L[~ 422595 O0 0~0 O0 0 CAI.,] HL1. IN 422595 C) O 000 O0 0 GP HL!. (J~ P ]J 422595 O0 ()O0 O0 (.~ CCL hLl V 422595 O0 000 O0 (, , , .:-. , .... 1 !, ! 4 68 OOOOOOO000 ,t 1 1 4, 6,8 0000000000 it i ! 4 68 0000000000 t ! ! 4 68 OOOOO0000o 1 t ! 4 88 000000000o 1, ! I 4. 68 000000 o 000 I ! ! 4 68 0000000000 t. I 1 4 68 0000000000 I 1. ! 4 68 O0000OO000 1 ! ! .4 68 O000000000 ! I !, 4 6~ 0000000000 1 i 1 4 68 O000000000 t I !. 4 68 O00000OO00 ! I I 4 69 0000000000 i, i 1 4 68 0000000000 :it 1 I 4 6~ 0000000000 1 !, 1 4 68 O00ooOOOO0 I 1. 1 4 68 O00000OO00 1. ! 1 4 6 B 000000 O 000 I ! 1 4 68 0000000000 ! 1, I 4 68 0000000000 I 1 ! 4 6~ 0000000000 1 1 1 4 68 O00000OO00 1 I I 4 68 0000000000 I I I 4 68 0000000000 1 1 t 4 68 000000000o 1, 1 1 4 68 OOUO0000oO 1 t I 4 62 O000CO0000 i I. I 4 68 0000000000 1 ! !. 4 66 OOUO000000 i 1 1 4 68 00000(,0000 ! 1 !,. 4 68 000000000o ! !. 1 4 68 gO00000000 C?~t:C, C,"~ I 26q3.336 RCEF'.C~< 1 428.6 T~:PF.C>i! -99g.250 r~'~pa. C:,' 1 3.~ .~Ct,'T, C~; 1 953.q29 RCF'T.CL !. 23~.5 G~.C~.: ! 73.625 CA !.,I. C:'~ l t~.5 l.,S o u t~.i 2.654 SSF' 14. ~,~b I 3.2 PEiF. ~1/, ! 26.23~ bSW! .F:L! 137.6 !_,5,,~4. ~;L 1 514.50o bS~ 5. Ei, 1 428.2 S S ~,~ 3. H I:,, 1 5452.00 ~., S S w 4. [;1,1 241 g. 0 I)wH 1. Hr, 1. 24.403 !3~.I0, i-~L ! -0.4 16 E~2~:h.CNI 6.032 CFEC.CN1 43 RCE~,;. C,,~ 1 236~.236 biP~!. C',;1 9a R"~t.: ~. C ~.i ! 4.000 NPOR.Ct, 1 42 C'-i'rC. C~ 1 99!.127 CFrC.C~l [)O ?<N~.C?I 152().000 CCL.C¢~I 36 P~'~[,. ilbi 26.234 PEFS.NL, 1 .'~. ~at.,1 3f) 4 75c) !,5~,3 ~bl 25 L ~ 2, ........ ;)~) 55v~5. ~;LI 32].500 R{iOB. ¢!bl ~;8 fTS,~L] 60.844 TE:~S.FL1 25 CCL,,.~I,I 0,146 446.503 45.495 -999,25§ 260,955 0,!46 18.453 685.000 2130.000 2,247 1520.000 Tape verification cblumberger Alaska ComputinO- Center D F; P 7', 7700,00 © E ~,! P ~,,!, C {,; ! C~'*'~:C ' Ci:',} IT~iP~ ,- 99,250 ..... T,~I~R ~, .~,.N 1 R C N T, C k~ :1 953, 92q RCFT,C~. 1 G~., C~ ~. 73,625 CALT.C~:I LS~.HLI ~,566 SSR~, H!., ! FEF,HL1 20,844 !SS'W!, HL1 L ~ w .~. H L 1 49 g. '~ 50 b S ~'; 5. 'h I, !, SSW3,HL! 5.452,000 $~w4, ........ ~ . ~ L I DPM!,HLI 2.3.251 CALl, HLI 6,188 GR, ;~L 1 DEPX, 7600,000 ENPi'{, CN.! CNEC.CN1 2622.026 RCE;F, C~-41 RCNT. C~ i. 967,247 RCFT.Cr~I GR.C¢:~ I 65,313 CALI,Cr~i LSRM,HL! 2,72! PEF,H[,1 33,500 LSat4 HL1 4!4 250 LSat5 ......... ,.', .. H I, 1. SS~3, HL! 452~~' '' ~,00() 88W4,~_L1 DFHI.HL~. 27.796 DRHU.HLI CaLl, ~L 1 6. 328 G;', [~L I DEPT, 7500,000 CNEC C;~I ~828,g89 RCCt;'. C~ ! T!'~PH * CN 1 99q,25C~ ~ CiN T ' C.;~{ 1 ~2Oi ,995 RCFT, C~,~ jj G~,Ciql 46,[~I 3 CALI,CN1 LSRH,HLI 2,717 SSRH. Fei., 1 PEF,~LI ~5,344 [.,Si~,. 4. ~b I 446,500 SEW3, H!.,1 4796 000 8S~:4, aLI DFHI..HL1 25:790 CELl. ~i[, 17'-,4g. Y.- 1 g9 ] !7:28 428,643 3,898 236,542 6.188 3,240 PEFb,HL1 I55.250 44'0,500 SSW1 2420,000 SeW5 H[,,I -0,401 CS. ~:ibl ?3.625 CCL,~BI 3,'748 RTNR,CN1 240.994 CNTC.CNI 3,479 PEFb. WL1 116,688 385,500 SSwI.HL1 1911.000 -O. 53! CS, HLI 65,313 COb, Ht~I 32.931 g~,~laA. CN I 532.708 RCM!'!, CN I 3.267 365.337 Ci, iTC. Cr,~ 1 6,309 TENS.CN1 ~! [., 1. 3 4i. 8 394,250 55~1, HI,..,1 ~02a, OOO ~... -0. 493 C5. ;ibl 46.813 CC[~.HLi 36.1.45 506.972 3.47t RTNR,Ci~! 29'?.4~4 ChTC,CN1 6,3(.)9 3,498 110.313 334.o00 SSkl .HLI 1970.0(,0 -O. 5u3 C5. ~2.938 CCL,Ful 6.032 2.368,2.36 4.000 991,1,27 2930,000 20.84~ 320,750 675,.500 335,000 16,3. 125 0,146 5.778 22': 8 970 3:831 1020,0'94 2865.000 33.500 271.750 495,750 205,375 896, o00 -0.1 q6 4,95b ';.533.175 3,427 1268 /487 2725:000 25.34-4 279,250 529 500 20!:625 930,000 0.107 5.266 2491.569 3,62(3 1153.129 ~755. 000 31.26b 2z}5.625 527.500 202.250 933.000 0.138 4.880 2469.949 3.472 !783.723 27!0.000 40,000 CFEC,C~I ~PBI,CNi ~POR,CN! CFTC,CN! CCL,C~I PEFS,HLI 58W2,~L! ~OB,Hbl TEaS.Nb!. CFEC.CN! CFTC.CN1. CCL,CN1 PEFS,H(,I LS~3.Hhl SS~2,Hb! ~Og,eL1 TENS.HLI CFEC.CNI NPHT.CN1 CFTC.C~! CCL.C~I PAGE: 446,503 45,495 -999,25() 260,955 0,146 18,188 671.000 2094'000 2,266 2930'000 453,809 42,75t -999,250 267'343 -0,146 25.250 589,000 1666,000 2'191 2865,000 570,751 33,984 -999.250 405,075 0,107 24,000 586.500 1777,000 2,224 2725.000 525,677 37,704 -999.250 337,541 0.13~ 21.266 510,250 1692.000 2,279 2755,000 57b.090 32.438 -999.250 404.821 0,103 23,625 Tape Verification Listinq :t~ll!mberqer AlasKa Computir~0 Center C~EC, CN :1 2607,523 T ~'p u C~:~1 -99q,250 Gl;'. C~<; 1 80.938 LSat, H[.,l 2.674 PEF .}iLl 2~.844 [,Sw~, b!I., ! 478.250 bS~$,~iL! 8$',~3. ~L! 4672.000 DPH]. ~!1.~ 1 30,733 CALl. ~L l (~, ] 16 CR, ~.-~L 1 OEP?, 7100. 005 gi4?H, CN i CI~.~:C. C N ! 2669,67~:) RCEF. Ci'J 1 r~P~ C~'! 999 25{~ 'r~i~:~.<:~,l GF.C~I1 92.125 CAI, I, Ci',., 1 PE~. ~.li, 1. 24.2t9 [,S~S 1 .EL1 hSw~.}lbl 395.50<) LSW5.~,!LI SSw3.HL! 4.63~,000 SSw4.H!,I DP~I, HL1 23.872 DR~.~O. ~bl C~L!. HL 1 6.316 gP. AL1 DE;PT. 709b,t)n0 g JPl.-!. cr'~ I C~,~ EC. CI',; 1 2794.616 TNP~.CiX! 1 -999.25t,) ~C~T,CN! 1042.24~ LS['~.~[,1 2.707 SS~t,hL1 F~.TF. [ii, 1 32,906 bS~ 1..~I[,1 L 8 ~ 4. H L 1 450.750 L S ;,, 5. h b 1 SSW3.hL1 4620.000 SS~4.ALI DPH !. iii, ! 28.39~.) PRh9. ~-;L 1. C3. I,I. f{i, 1 6.316 GR. ~{L 1 17-.!,'1A¥-1,991 !7:.28 43 ,740 RCE~.Ci'~I 3.96,9 ~33.1u9 C~.!TC, Cr~ 1 6,316 3.430 P E F h. ~.i [, 1 35 875 bS~.H:bl .. 13 ~ 750 88W 1 .*,~bl t957.000 80.938 CCb,F!bl 456.172 RC't¢,J. CN I 3.895 245.668 CNTC.CNI 6.3!6 126 438 355~250 SS~'i,HB! 1977.000 -0. 502 CS. ~LI 92,125 CCL.SL1 460 747 RCE~'~ 3,759 RTN~:. CN!. 266.210 Ct4 !'C.CN1 6.3 ! 6 T E r,i S. C ~,~ 1 3 457 P F F L, 131: 50n I.,S ~'2 383.000 SS~I .~L1 1925.(',00 SSwS.HLt ¢6.7b0 CC! .... 291,.750 552.O00 2 ! 5. 625 948.500 0,103 5 8'tl 2z 3 463 3.877 973.215 2670.000 28.844 327,000 523.000 204. 750 905.500 -0,078 5.5~5 2376.460 4.068 1024.90~} 2565,000 24.219 269 0oo 535: 500 199.000 911.500 5.76t. 2465.626 3.88.! 1. 04it;. 185 27 oO. 000 32.906 2 ~ 8.500 520.000 207.750 90~. 000 o. LSW3.~LI PAGE: 636.500 1.834.000 2.!9~ 2710.000 444,154 46,781 '999,25() 252,655 '0,078 22 516 669 000 ~795 000 2 1.4:] 2670,000 478.043 45.429 877 0,088 20,484 553 50O 1709~000 2.256 2565.000 485,068 42.959 -999.250 282.850 0.136 2!.281 616.500 !766,000 2.!82 270O.000 $~:~V ! CE : FLIC ¥'ERSIC)N : D a!:' ~ : 91105/17 ~X ~EC S!ZK : SE~ViCH : F'L~C YE~SIO~',: : ~I!05/17 ¢~EC SIZE : !024 TYPE : F I L E : ********************************************************************************** [< U Pt~ R t,j K RIV,: 50-029-22 ! 45 I ?'J C, DA'.FA I,~C!,t~DK!J - C ~,i T - G o C r,.: 2 ****************************************************************************** !7:28 ~FI~ 50-029-2~1~5 AP! $ FL 507' F~L & 143' ~EL Fie[O SFCT 31 Sectl $~g? ~B~S~ State L~TI' batitu LC~G l, onqi. t Name !~ame erial N~ber Location or province de ude SOi'~ ~22595 KrD FT' 0 , APD FT 130. g~ FT ! 30. Ele EDF FT !29, Ele EGt., FT ~7, gle TDD FT 7700, Tot TDL FT 7704. Tot BLI FT 770!, BOg TL! FT 71 O0, Top D F T ...:~ ~ ! ~; D r i. DF[) G/C3 10.6 DFPM Dri DFV CP Dr i DFL ~3 ?,~MT DEGF ~FST DEGF' BHT DEGV bott Service Order ~umber Permanent datum flevat, ion of Perm, Da ~easureO From vation of Jelly vation of oerric~ vatlo~ of Ground [, al Depth - i)ril.!er al Depth - tom [.,o~ IDtervai Lo~ IBtervs1. !!ln~ Fluid Type llin~ Fluld [)en$it llinq Flui.~ Ph !linq FlulO Viscos ili. n~ Fl~lid Loss stivlt¥ of ~ud Sa Samule Tem~eratur stJ, vitY of mud fi Filtrate Sam¢le T stivit¥ of ~ud Ca Cake Sam¢le Tempe ace Temperature on Hole lem~eratu ZO ~E ZO~E ZC~E ~.S "lau, e verlfication t,i. stI. nq :D.!u,.berqer A]..aska Ccr~'~l'ut. inQ Center PAGE TYPE : CURV ECEF TNPN TNR~ ~C~T ~CFT C~ TC CFTC C~I~I CC!, l~ S W ! L S W 2 L8 w 5 SSW2 SSW4- SS~ 5 D P H T DeDth Channel Name Epithermal ?eutron Porosi. ty Ca!lbrated ~:pl, t~ermal t, ieut, ron ~at, io Corrected Far ~.:pitt~erm~l Counts Corrected ~.~ear ~:p,~.thermal Counts F:a:~ Correcte~ Ep.i.t~ermal Far Counts Raw Corrected tJDit:hermal ~ear' COunts Thermal Neutron Porosity Calihraten q;herma] NeutIo~'~ Rat~.o ~a,, Thermal ~;eutron ,~et.!tro~ Porosity Output From aP ApplJCatioD Pro~:aram ~ CN'r CNTC CFTC G~mmo. Caliper Tensl. on CCL AFr, p l. 1 t t,l c:7~ e [,onq Spacing t~,~'r'~'~ (!~corrected) Short PEFI, Photoe]ectr~c g'actor ~.,~2 I~S~B LSW5 SS~2 SSw5 f)ens 1. tV Pore, si tV D P }~ i[~ Uelta Rt.~!~ CS Cable Speed I ~,.~$ tens CALl. C~l. iper (;~ Ga~a Ray CCI. CCL PAGE: '~[""';~'[:TcF T ........... ,"~'.,,.,"v ~ ....... ~'~'''; ..... ~''~ ......... ?~[ ......... ~; ....... ....... o .... ~, .... APl P A. I F!L, N.r,:t. $[]ra~ R~PR P ......... ID CPDFR ~ fOG TYPE CLASS :~[)r'.; Nb;4~ SAY~F ~:~...bJ'~ CODE (HEX) ............ ~'"~ ....... ~; ....... ';~ .... ~ ........ ~ ......... X .......... DEP~ F 22bq5 000 . 2 1 6~ 0 0 _ 0 O F~PH ('~.~ 2 ~[.; 422595 O0 onc~ CC. 0 2 1 1 4 68 O000oo00~O E,~'P L C~2 42259~ CFFC C~:2 CPS 422595 O0 C~'F:C C,?:2 CPS 422595 O0 RCF. F C~2 CPS 422505 RCF:b C"~2 CPS 422595 Ob NPHI C~2 P[~ 422%q5 TNPA C~:,~ 4-~ 5c)5 0(~ R~NP C ~',,~ 2 ~22505 O0 i~ Pr;P Ct:? ptl 4~'2595 :$ Wo~e Ver!~i. cation L:tstinq :hlumberger Alaska Comput. ir',~ Center 17-!4A¥-199! 'i7:2~ 13 Rc ' CN2 CPS 42 5 CNTC CN2 C~S 422595 CFTC CN2 CPS 422595 GR CN2 GhP! 422595 TE~S C~2 l..,a 42~595 CC!., C~2 v 422595 $SRR BI, 2 G/C3 422595 P~;F[.: ~L2 422595 PEF$ ~L, 2 422595 P~F: ~52 422595 LSW~. ~[,2 CPS 42259~ LSw2 i~L2 CPS 422595 LSw3 HI,,2 CP6 422595 LSw~ HL2 CPS 422595 L8w5 HI.,2 CPS 4~595 8si! Hb2 CPS 4.22595 SSW2 HL2 CPS 4225g5 $$w3 ~L2 CP6 422595 SSki~ HL2 CPS 422595 $8~5 HU2 C~S 422595 R~GB ~52 GtC3 422595 DPH! NL2 PU 422595 D~HO Hb2 G/C3 422595 C$ HL2 ~/H~ 422595 TFb8 ~52 bB 422595 C~I,I PL,~ IN 422595 fi~ HL2 (;~PI 422595 CC!, HL2 V 422595 0 o 00 ¢~ 00 0 O0 000 O0 0 00 0 n 0 00 0 O0 00© O0 0 00 00 () 00 0 00 000 o 0 0 O0 000 O0 0 () 0 0 00 O 0 0 00 00 () 00 00 000 00 0 OO 000 O0 0 O0 000 O0 0 00 00 ("> 00 0 0 0 00 () 00 0 00 00 (.~ 00 0 00 000 00 00 000 00 0 00 0 () 6 0 0 00 000 0 o 0 0 O 00 ,O 00 0 0 [: 00 C.' 00 0 00 00 C 00 0 0 ti 000 00 O0 00(: O0 0 00 000 00 0 00 n 0 (; n (:: 00 000 00 0 0 O 00 (') O 0 0 00 00 (." 00 0 2 ~. I 4 6B 00o0000000 2 I I 4 68 O000oo00oo 2 ! 1 4 88 0000000000 2 i I 4 6 ~ 0000000000 2 ! 1 4 68 0000000000 2 ! ! 4 68 O0000000OO 2 1 1. 4 68 0000000000 2 ! I 4 68 000000o000 2 !, l 4 68 0000000000 2 1 ! 4 68 O00000oOoO 2 1 1 :~ 68 0o0000o000 2 1 1 4 68 00()000o006 2 I I 4 68 0000000000 2 ~. 1 4 68 0000000000 2 I ! 4 68 000000000O 2 1 I 4 6 8 0000 () 00000 ~ 1. ! 4 ~8 000000o000 2 1 ! 4, 68 0000060000 2 ! I 4 68 0000000000 2 ! 1 4 68 00o0000000 2 ! 1. 4 68 0000000000 2 ! I 4 6g 00000000o0 2 ! 1 4 68 0000000000 2 I 1 4 68 000000 o (, 0 O 2 I !. 4 68 00 O 006 o 000 2 ! I -~ 68 OOUO000000 ELE~ CODE (HEX) 1 . B o ~0000 DEPT. 77l. ! .COg TNPH. Ch 2 -999. 256 pC~,~?. C!e2 ! 042.24. a (;R. C~.~ 2 86.7 I.,SRH, HI,2 2.7fi7 P~TF. Hi,2 32,906 [.,8w~, Hi,2 456.7hq Sf~v' 3. Hr,2 DF~sT. HI,2 28.39," OF.P'[ o 770C,, OOO C t".i KC .CN2 24 ~ i:i, 844 28 [-:~'; F ~:. C:~ 2 5.76! CFEC.CN2 47 RCF :'~. C~2 2465.626 59 P Tb f:;:. C[',~ 2 3,883 NPOR.CN2 111 { ) (~[I,[TC. C ~ 2 1048.1R5 CFTC,CN2 u0 TF:t'~5. C~ 2700.000 CCL,. C~,;2 57 PPFb. r{[,2 32.906 , "' ~,I.,2 520 000 85~,2 ~I..,2 O0 ,~S~ !. , , . . O0 SS~sS. qt,? 207.750 RHEim. HI,2 27 C&,. x!_,2 908.000 TE:NS. Hi..,2 50 CCh. ~:~i~2 0.136 485.068 42.959 -999.250 282.850 0.136 21.281 616.500 1766.000 2,182 2700.000 434.405 4,6.236 -999.250 262.298 lis ~'ar~e Verification Listiho (;P. C!:~ 2 103.000 CALI.C¢~2 LSR[~.ML2 2.699 SS~: !:i. IiL2 PEF. HL2 28. 000 I~S~ 1 .HL2 LSw~, F!L2 45l .750 LS~5. HI, 2 SS~w3.~L2 4952 ofio SSw4.. [)PHI, ~[.,2 25 ' ..... ft I..~ 2 ,76 ! OR~O.:HL2 C~LI. EL 2 t:~. 336 GR. DEPW. 7600.000 E~IPFt. Cm 2 C~?EC.Ca2 2633.663 RC~::~T. Cr~ 2 1()04.620 ~CFT.CN2 G~.CN'2 79,875 CaL!.C~2 L S ~ ~, H [,, 2 2,730 S S ~ H. ~ G 2 F.E F. H b 2 25.07 .~1 b S w ~. H [.., 2 [,8 w4. [,i [., 2 43!.750 LS¢~5.NL2 5$~3 . BL2 4496.000 5S~4'r.1.,~2~ ' D [;! P T, 7500. (.i 00 E N p ~.,[. C ~x~ 2 CNMC,CN2 2~10,239 RCEF.CN2 TNPM,CN2 -999.250 ~C~ T. C~...~ 2 1!94,5!7 RCFT.C~ G~.CN2 50,281 CA t !. Cr,.~2 LSRH,HL2 2,71! SSRE,H[.2 PEF,HL2 32,063 bS~!..HL2 !..~S~ 4, b~b 2 427,250 LSWS, ~.~L2 SSw3,HL2 478~,000 SS~4. },,~L 2 CALT. RL2 6. 344 ~r{. HL2 I) F.-': ~ q' · 7 ~i O 0. O 00 I< '.' p .... !:'.-' :' tl , (.', r.:, ~. CNI;C, CN 2 27 89,967 REEF. Ch 2 PC¢~7~.CW2 1.1o2.0~3 ~CF~.CN2 G ~. C N 2 62,313 C A L, I. C ~.; 2 LSK~. ~'~I,2 2,775 SS~ q. ~1,.,2 PF~F. BL2 22.2~ ! LSW 1. L S w 4. H L 2 38 '1. (,:, 00 L 5 W 5. ~; L '2 eS~ 3 MT. o 2 4564. (' 00 SS~~ 4. ~L2 . . m ~ .... , ..... C~LT. ~L2 6.344 Ca. H'i..2 Cf'~ r~¢. C;~ 2 2 ~ 4 ..l. I 51 ~CEF T~P~.CN 2 -999. 250 Ta~a. Ct, 2 PC~x~'. CN 2 1229.93] GP. 6:42 51., 594 CAI, !, Chi 2 I,ge~ ~L2 9 703 Pi;g.hL2 25.547 LSW4.HL2 454,500 hS¢5.hI,2 6.336 TEN,S. Ci,J2 3.377 PE L,;-lb2 139.3'15 LSv~2. HL2 423,750 85 ~,~ !. h 1..,.,2 -0,475 CS, HL2 1. 03,000 C C L. ~..l i.., 2 42,033 4 l 2.751. 3.9~3 6.344 3.498 !29,!25 ! 852. 000 -0. 540 79. ¢ 75 33.548 ENk. A.CN2 527.0~9 RCF*,~.CN2 3. 192 RTNR.CN2 369.082 C~,.i TC. C r'~ 2 ~.344 TF:F¢5. CN2 3, ~i! 8 PEFL, H.L2 !24.250 LSW2.HL2 403.250 S5~l,hb2 2035.000 55~5. H.b2 '0.497 CS. ~'fh2 50.2~1 CCb,JL2 5i8.226 3. 456 ~']:~iR, 6~2 311.760 C~,~I"C. C~ 2 6.344 TEt,'S.C:U2 3.a94 PEFL.HL2 120.563 339.500 SS~I .HL2 953, OOO -0. 505 C.S, b2.3!3 CCI,. H!.,2 .316 2 ~ () C ~,~ 'I C, C 500 SS.,.' !. 2090.onJ 4~0 CS, ~TL2 594 CC!.,. 2850.000 28.000 295.750 54!,500 211,375 91. 4:. 000 0. 064 5,796 2351,538 4,034 1(:)43' 375 2760,000 25.078 264, '150 500,250 1.99,500 927,.500 0,!.23 2450.912 3 3()9 1,269.'251 2785 00() , 32.063 280 250 1,9!.. 250 900 500 5,057 2364.581 3,550 1169 085 2770 ~ 000 22.281 246,750 534.0(10 202.625 900.500 0.078 4.81'1 2540.336 3.189 1263.058 2785.000 25.5t7 2~8.750 550,000 219.375 899.500 0,07~ CFEC. CN 2 ,'~ P H !'. Ci',~ 2 NPOR .CN2 CFTC.C~!2 CC[.,Ck~2 PEFS,HL2 [,SW3.HL2 SS~ 2. hL2 H H[.i~. H.L2 PA G ~i,:: ! 4 0,064 24,703 611.000 1800 000 2850.00 454,367 45 762 -999 250 277 263 0 123 2!'188 575.,000 1678'000 2; 91 2760'~00 560.t45 32'629 -999,250 413,520 -0.114 23.109 s 9: oo 1,80I O0 2.215 2785,000 551,659 37,436 -999,250 356,784 0,078 19,594 522,000 1718,000 2,272 2770,000 590.288 30.722 -999,250 421.99b 0 O76 23~375 613,000 !~23.000 2 224 27~5~000 Verification Listi:nq :h!un;berger glaska Co~2[::utina Center TNPH L S R P LSW4 C A L 1 .C~'2 2603, ....... , C{>¢' 2 926,165! . C~: 2 80.625 ' H L 2 2.6 7 f~ .HL2 :26,625 ~'~L 2 473. 250 HL2 4752,000 H L 2 29.473 :ti L 2 ~, 34:4 7100.00 (:. E N P H. C ~.! 2 ~ C. FI 2 2662,559 RCEF,Cb2 . C N 2 00 I., 472 R C F T, C ~:~ 2 ,CN2 85,938 C~.L!, Ci~ 2 ,HL2 2,746 SSRH.HL2 .HL2 2~,07a LSWl,HL2 H L 2 405.75 (; L S W 5. !4 [~ 2 H.L2 4652,000, ,SSW4.HI~2 aL2 24.765 !:)ag::l. HL2 HL2 6,336 GR. ~.4L2 ** CNi') liF i)t~:ri% **** FILl: F~I,K t.~aaF: : F' SF'~vICK : ~'k. l. C DATK : 9t /(.,5/I7 ~,~X REC SIZE: ; 1~.~24 FTLF TYPE' : LAST FILF 17-~<3~Y-199! !7_.'28 233 ' 82 7 C 6.344 3.410 PEFL, ,!!9,750 ,,. 5~1, 2016.()00 88'w5. r{'G2 -0.5 ! 5 CS, a0,625 40.270 42! .231 4 ' 075 a T t,:! ::. C ii~ 2 245,920 CNTC.C~:2 6.33b TENS, C~'~2 3.4bg PEFL.HL2 118. 000 LSd2, :'iL2 344.750 SS~:!, ~.{L2 1966,i)o0 SSWS,HL2 -0,5U7 C5, ~!b2 85,938 CCL,ML2 444.768 3.920 RTN~.CN2 2.46,172 Ct..iTC. C~2 6,336 3.405 ! 27.3 I 3 392,750 55~1 ! 939, ~)00 58~5. dL2 -O,5~a C5.4L2 ~'~. 2 St) CCI..,, dL2 6,007 2293,566 4,. 20 ~! 993.5]7 2655,000 26,625 3!.2,000 535,000 2 () 5.000 9!7,000 0.!64 5.643 2306.511 4.286 1032.500 2600.000 28'078 26!,500 544.000 190.250 922,500 0.1.23 5.930 2373,122 3 950 !051~204 2570.000 29 141 294:75b 508,000 1.97,750 916,500 O.nO1 NPMI,CN2 NPO~,CSi2 CF!:C,C~2 COb'Ca2 L S ~ 3: H L 2 S S w 2, ~i L 2 a HOB, HI., 2 TE~$. CFMC.C~2 NP~!,C~2 NPOR.C~2 Cf'TC.Ca2 CCL.CN2 PEFS,HL2 LS~3,HL2 8SW2.HL2 RHUB,HL2 TENS,HL2 CF~:C.CN2 NP~I,CN2 NPOR,CN2 CFi'C.C.2 CCL,CN2 PEF$ HL2 LS~3:~L2 8SW2,HL2 Rr~OB,BL2 TENS,hL2 4]3.463 47.742 '999,250 251'835 0.1,64 23,031 658,500 1808,000 ~,1,64 2655'000 471,854 48,714 -999,250 266,959 0,1.23 !,8,938 569,000 1710,000 2,241 2600,000 471,240 45,889 '999,250 279,060 0,001 24.203 605.500 1794,000 2,185 2570.000 IS Tar:e Ver!flcattr:~ l.,Jstin,:~ cblt]mDer~er Alaska Compt~t.in9 Center SERVICE : VERSIO?,; : ['~TE : g!/oS/t7 FILE TYPE : 1, 7-MAY-l. q9!. 17: 2}i~ PAGg: 16 FILE - EI)IT,O03 ARCO AbASKA, !~C, !L-1.~ 50-029-22145 PASS THF.~EE LOG DATA ~,.'S,, ?RO~'! FIE;[,D FIL.~; ,023 P ~, T ,~ .5 A !vi F' [,: d t~: V E R Y 5 ¢. 0 ~} F g f~: T 1: O fi L ~'~ A ~,~ E ****************************************************************************** TUt~ I V,~,L(? ,%EFI TYPE ................................... ...... ..... .................................... I ~ Ct,~ AkC[~ . t,, om~an e . F~' FLJPANL;N ~I9~R Field Name SE¢'r STAT 50-029-72! .507' F'~,iL ,1;1 ~ell ~afne APl Serial tiumber F~e!d I,,ocation Towhs~j.p Range Codnty State or Prov~ce Nat~on 'rape verification [,~istin~ .:hl~mbe'.rc~er. Alaska Comput,~pO Cent:e?' PAGE: 1,7 TUNI ~.A[,[; bff;FI TYPE '~;/7'"'' .... ' ....... '"" ........ ' ......... ' '"" ............... '" ....... '"'"'"' .......... "'"'"' ..... bat: i rude L 0 ~,! G Lo~q I. tude $0~ 422595 Service Order Number PDAT ~St,, Peri, agent datum EPD FT O. gl. evatlon of Perm, Da L~F R~9 boq ~easured From AP['} FT !30, A~OV~ PER~A. NENT DATUM E~'[~ FT !30, Elevation of Kelly BU EPF FT 129, Elevation o~ Derrlc~ EGL FT 87. Elevation of Ground L TDD FT 7700. Total Depth - Driller TDI, FT 7704, Total Depth - Logger BLI FT 770!. ~{ottom LOg interval TI,,I FT 7100, Top Log Interval OFT ~P!~!E Ori,!lin~ ~!uld Ty~e DFP G/C3 lO 6 Drillin~ Flu. id Pensit D,. P~' Drillin~ Fl~l,d PB ZO~!E DFV CP Orill.in9 Fluid VIsCOS DF!, F3 Orl!li. ng Flui~ boss ~S o!!a~ Resistivity of ~ud Sa ZO~g ~ST O~GF ~ud Sample Temperatur' · ~,,~",.. aesistlvit of mUd fi ZONE MFST DEGF Mud Filtra.e Sa~pl.e T ZOnE R~CS Oaaa Resistivity of ~uo Ca ZO~g NCST DFf;F Nud Cake SamPle 'ren~pe STE~ DEGF -999.25 Surface Temperature BHT OEGF Bottom Uole TemDeratu ZONE: T ,.I N ! [~ [? F P T D ~; P D F P H D F V D F !..., R ,'~, $ l..,i $ 7 'T ............................. ,~- ;~ ...... ' ............................................................. o o f) . 0 . 0 , 0 , O. O. O. O. 9 E FI · ,,eDt. a a~e E~!PN E:~Itnerma] ~'.,eu'.tron PorositY F~:R,a Cali~)rateJ ~<pither-msl ~,~eut~or~ [~atio C:F~:C Corrected Far En.!tner~,s] Counts Verification Listing ichI, umberger f~los~a Computing Center 17-?~A¥-! 991 !7:28 C~t.:C ¢°rrected ~ ar E ir at~ I (' t e P he m ,dun $ RCEF Raw Corrected Epitherma! ?ar Counts RC~7~-~ Raw Corrected ~p~thermoI ~.tear Cour~ts NPHI aeutron Porosity TNP~ Tber. mal r':eutron Porosity TNP~ Cali. brot. e~ Tt~ermal Neutron Ratio R?'~,~F: Raw ~her~,al Neutron Ratio NPO~: ~eutron Porosltg Output Fr'on~ ~CFT ~CFT CNTC CNTC CFTC CFTC G~ Gamma CAL~ Caliper COL CCt~ /~.mp.1 i t U. de [.~SR~ !..,Onq SoacJ. r,q PHOB (Uncorrected) SSE. h Short Spacino Gu!k: Oe~sity p E F' L F E F [, PKFS PEFS PFF Fhotoe!ectrlc Factor I.,Sw3 b8~3 /,Sw5 SSw:I SS~I. SSw3 S8w3 R}4QB Rt!lk Density DPHO Delta CS Cable 8~ee<! TENS Tension CaT,!' Cali~er G~ Gamma CC!~ CCL A~pli PAGE: S ~ar.::.e YerI. i~i. cation List~nq blU~'~Der~er .~l~ska. Computino~ Cent. er i7-~A¥-1991 !712g 1¸9 4 6f~ 1 5 66 6 7,3 7 65 8 68 0,5 9 65 ~2 68 13 66 0 t4 65 !5 6,6 68 !6 66 0 66 ** SET '!~PR - CHA~ ** '''''~ ~ ~I~! ;~;; ~l[ ~;''~;~' ..... ~'~'''' .... ''''''''''''''''''''''''' ..... K "'''''''''''''' o . ICE P. API APl P F![,E.. ~i .~ o Z.,.,E; R..;PR PRO. C. ESS ..... ..... . ..... ;i- .......... ; ..... .-.--; ........... ..... ....... .... D E P ~" g T 2595 00 ,00 O 0 3 ~ 1 4 000 ENP~;~ Ci',¢3 PU 42~595 OO 000 oo 0 3 ! 1 4 6R 0000000000 F;.'~iR~ C:~ 3 422595 CFEC Ca3 CPS 422595 O0 CK~FC C~,:3 CPS 42~595 Oo RCEF C?,~3 CPS 422595 Oo RC'g~0 Ct-~'3 CPS 42~5q5 O0 ~,~ F }~ ! C ~"~ 3 Pil 422595 O0 T~PH CN 3 Pt} 422595 T~,:P~ r,'~3 4225~5 O0 PTNP C~¢3 422595 O0 RC~,~ Ct,~3 CPS 422595 OO CNTC CF;3 CPS 422595 CFTC C¢~i3 CPS 422595 CF' Ct,~3 r;gPI 422595 OO T~;eS CX3 !~P, 422595 OO C C L C" r,~ 3 v 42259 S 0 [.~SR~ HL3 G/C3 4~2595 O0 SSF:h P,I~3 ~/C3 422595 PEFI., HL3 422595 O0 P~'8 ~I~3 4225~5 OO Pgb' ~I~ 3 422595 L,~ ~ ! MI,3 CPS 422595 [,S,e 2 [~!:3 CP& ~2250b LSat4 ¢L3 CPS 4~2595 SSi,; I }~ !.., 3 CPS 422595 5 S ~',, 2 ~:~ b 3 C P S 422 E, 95 o0oo0000o0 00oo000000 00o00oo000 9000000000 00o0000000 0000000000 oOOO00OO00 0000060000 0oo000000o O00OOOOOOO 00o0o00000 0o0000o0o0 0000000000 oo00ooo00o 00o0o00o0o OOnOOO00Oo oonO000000 0oo0o0o00o nO0OOOO0~O O0OOOOOO0O OOOOOO0OOO O00000C~O00 OOfiOOO00C)O O000OOOO¢)O () 0000 (:, 0000 O0000O~30OO u9~OOO00OO OOOOO00000 OOC, OC ()OOO0 O()O(~OOn 000 S ~lope Ver,!f!.f. cation bistin~ b!umbert, Ter .3.1asKo Cotr~putin9 Cen. ter 2O ~, C 22595 O 00 {2~ .0 0 ! ! 4 68 000000 n SS'~ ~ ~!,,3 CPS 422595 O0 000 00 0 3 ! l 4 68 O0000O(>O()O SS~5 AL3 CPS 422595 O0 000 (::0 0 3 i 1 4 68 0000000000 RHO¢ '~I.,3 G/C3 422595 O0 000 O{) 0 3 I ! 4 66 0000000000 [)P~ I ~L3 PU 422595 00 000 OO 0 3 ! ! ,4 68 0000000000 O~}.~O Ab3 G/C3 422595 00 000 00 0 3 ! 1 4 68 0000060000 CS AL3 F/ilk 422595 O0 ()0o 0{) {) 3 I ! 4 68 0000000000 T E.t~.~ S }'i 1.,, 3 L ~5 422595 00 000 00 3 l I 4 6 ~ 0000000000 C?4LI EL3 I¢ 422595 GO 000 00 0 3 ! 1 4 6[~ 0000000000 G~. ~!,3 G~.PI 422595 00 O0(, OO 0 3 I i ,~. 68 0000000000 C C L ~ I, 3 ~ .., 22595 00 0 o 0 i) o O 3 ! 1 ~ 68 00000000 o 0 L,.~[,.'~i C~,~3 49 ~63 R4 Ct,:3 .437 CFKC.C~3 D K ~ T. 771. 7 t', o 0 ..... :':" E ~' ..... ~ ..... ~ . - ~ I,,.~ ~' ~ ," CTNEC,C~ 3 26.46,a73 RCEF. (::~ 3 394,6'7~ PCEi:;, Ci:~ 3 2327.O30 t,J P'H I, C'~ 3 Th~P~.C:~3 -~9.25(, Ti'JR ~, C/x: 3 4.1~3 RTt,~, Ct~ 3 4.23! GF~'C~ 3 78,250 C~L!. . l.,S~,~b3 ? 705 5SRS-I t 1.,,3 3,406 PEFb,AI.~3 28,438 . L~ , .... PE~'. ML3 28.4~3g hS~ !.. hL3 144.375 ~S~2. [~1[,3 266 500 ,e,,~ ~['~3 456 50(': LS~5 ~::1,3 ,415.500 SSt~! }~L3 555:000 88~;2 BSe~3 l.':i L 3 ..490 ~, (~ 0{':~ 88~4. HI.,3 2017.OO0 5B~v5. ~b3 173,875 [)PhI:HL3 26,31~ l:::, ~ [,, r'~. ~,~ !.; 3-0'49! C5.HL3 168,875 DIKpT', 7700.000 E~P;{,C~3 49.~63 E~,IF A, CP, I 3 6.437 CFKC.CN3 C~:C. C~ 3 2646.~73 PCEF, Ct,~3 39~.678 RCE?J, C~3 2327.030 NPhI,CN3 TNPH,CN3 -99o.25o 'rt,~¢~, C~' 3 4.123 ~Tt,:R. C~.~3 4.23! ~C~.~T. C~,~ 3 lO~,f~17 RCFT.C~,~3 23~.!e, 7 Ct..~TC. Ch 3 IO56,2~0 CFTC.CN3 G~ Ch3 7~.25<: C~t,I.Cb3 6.336 TE~'.~S. ~ 3 2825.C00 CCL.C~!3 LS~M:HL3 ...... 2.69'~.,, SSF~I.H[.,3 3.3~9 PKFb, L3 27. .984 .PEFS.HL3 PEF.ab3 27,984 LSb 1, ~I.,3 138,~25 bS~2.HL3 305,250 LS~ 3. MI,,,3 L,S'~!~. hb 3 456.250 BS~5.H!,3 4o2.5U0 SS~I,HL3 542,000 88~ 2, ~1..~3 55¢~ 3, ~I, 3 490~.000 SS~4.~4L3 2041.000 5S~',5. ~b3 210.125 OF~I,F,I,3 26.~l. 7 D[~:~, F!,,3 -0.467 CB.ab3 904.500 TENS.hA3 C~[,I.hL3 ¢.33b GR.}~L3 7~,250 CC!:,. BL3 0.1.32 DFp'r:.~ .. 7f:{~i:,r~0(:__ ,,, . I,.:,:'.-:r'd. , ,Ch3. 42.1~n. Eh¢.a. Ci,i3. 5 809, CFF:C.CH3 C~,:~:C.C;,,3 2~29,~,~l ~CEF.C~:3 431.822 Rc~::'.,, C~ 3 2297:a81 ~,;PHI.CN3 'r~p},. c~, 3 -999,250 I ~',: P ,~, C :'.~ 3 3.~73 ~Tt~, Cb3 4.032 NPOF:.Ch3 RCNT.CN3 1015.989 ~CF'I .C~:3 253.535 CNTC.CN3 1047.82~ CFTC.Ch3 G~:. C~: 3 60. !~ (:~L!.C~:3 ~.328 l'~:~s. Ca3 2670.o00 CCL.C~,3 I,S~. Hi., 3 2.7!4 SS~H.~!.,3 3.a9~ PEF {~. ~ii..,3 23.078 PEKS,HL3 F[F.FL3 23.C7a bS~l.hi,3 !26.503 L5~,,2. i-iA3 274.000 bSv:3.Hb3 L S~.; 4. PI., 3 ,i 12,500 I,,S ¢~ 5. FI,3 355.500 5S',t .?!b3 503.750 SSk:2. FIB3 SS9:.3, HL 3 4544.006 35;<4. i~I.,3 1844.C(:O S5v:5. i,:b3 200.625 RHOB,HL3 !)Ftq'I.BL3 2f>.2~8 OR.~O.~t.,3 -0,53o C:f; ~-~:t,,3 895 50o T~,.~S ~I,3 CAI, I.~I,3 6.328 G~. r: l... 3 69.lb8 CCL,~L3 -0.031 411.!.23 49.595 -999'250 262,748 0.132 19.531 600,500 1807.000 2,216 1550.000 411,123 49.595 -999,250 262,749 0.132 22.672 643,000 1821.000 2,208 2825,000 452,689 45.039 -999 250 278~338 -0.031 20.063 569,500 1658,000 2,216 2670,000 IS Tape Ver!~i, cation :h,lUmberoer Alaska Co~p,.ltinq Center' DE'PT, 7500,000 E~IPF!, Ct~ 3 C~E,C, C~,! 3 281 8.309 ~CEF,CN3 T~i P F! CN3 -999.2B0 T~'~R A. f'~a 3 GP,C~ 3 53.1,56 CAL!.Cf~3 LSR~,~L3 ~.735 8SRH.ab3 P~:F. H.L 3 30. O63 LSW ~. EL3 [,.,,$ b~ 4 HL3 426,250 i .... .E:L . ............. ,oW5 3 ~ 8 b~ 3, H L 3 4652, (> 00 S $ ~ 4, :~ L 3 CAI,I, HL 3 6. 344 G~. :~L3 CNEC.C~: 3 2776.649 R CEF. C~'., 3 G~' C~ 3 65.4:3~! CAL!, 3 PC~. HI.,3 14,555 bSW~.H[,3 339.250 LS~S.NL3 SSw3.~.iL3 4528.000 SSV;4,}~b3 DPHI.HI, 3 1.9.333 D~aO.Hb3 C ,~ t, !. H b 3 6.3 !. 6 G ~, .h L 3 C?.~ EC. Ct,:, 3 2847.472 RCF:F.Ch3 T~P~'~ "CN 3 -9~9,250 T~A.C~3 ~Ca~,C~3 1228,~29 ~CFT, Ct<~ 3 [..,$~E. HI, 3 4.03! SSw3.HL3 4792.060 SSW4.HL3 DPF~!. ~!,3 -83.907 CALl. ["!~ 3 6.3 ~ F GR. bEPT. 72(.)O. (20 () CNEC.Ct43 2625.59I RCE~'. Cl~ 3 .... r~52 NC~'~T C~. 3 q4~. ..... G~.CN3 79.675 C~LI.Ca3 t.S R [.~, H [.. 3 2.693 PE~.~L3 24.656 LSw!.n!.3 1, S[,~4. ~[~ 3 4.47.500 SSw3.~L3 4732.C00 DP?ii .f~L3 28.490 C~.bl. HI, 3 6.32L~ G~. ~L, 3 31,546 3,065 3~38,896 C~.!TC. CA~ 3 6.34:4 TEb:~$. C;~ 3 3.441 PE~:.L,. Hb3 i21.!25 389. () 00 S S !~; !,. a b 3 2015,000 88~5, Hb3 . 156 CCI,,... 37.836 E~Rh,CN3 497,711 RCE~,CN3 3.406 300,O22 C)t',~TC, Ca 3 6.3t, 6 ,3.506 P E F b. ~i L 3 I61.750 [.,8W2.'HL3 340,000 S S ~ 1, ~.:i h 3 1994.000 Sswb,dL3 -0. 465 CS. HL3 65,435 CCL,SL3 32,34:5 EN!~A, Cf. i3 3,242 RT~R,CN3 346.081 Ct,!TC.CN3 6.3~6 tENS,C~;3 4,027 P~FL, HI,3 4!6.250 LSat2, qL3 -t~9. 125 SSt~l .HL3 2054.000 58~,5. a.b3 0.002 CS.HL3 55.688 CCI,, ~L3 45.9Cb 419.849 221.465 Ct:I'C. CN3 6,32(3 3.428 PEFb.~b3 !32.~75 4! 5.5(~O SS~; 1 .F~b3 i9t~4.C00 58~,5.~L3 -0.5 i 5 CS. hb3 79.~75 CCL.~L3 45.437 413.657 .7.54,638 3,5i2 4.~!8 2492.583 3 232 t280 40I 2655 000 30 063 284 25U 525 500 901 , 000 -0,070 5 423 2463 004 3 494 11.59 267 2690 000 14.555 277,000 509,00O 193.500 905.500 -0.041 4,898 2555 518 3:!77 ~264,055 2610,000 40 000 233i500 553 500 206 250 90 1,00o 0. ~05 6.122 2300.!41 4.345 973.783 2620,000 24,656 2~7,500 548.500 209.750 911,000 -0.141 6.083 2291.799 4,276 1OO9.~32 2630.000 1.692 CFEC.C~3 aVE!.Ca3 NPOR,CN3 CFI:C,CN3 CCE.CN3 PEF$.HL3 bS~i3.M[,3 SSw2.Mt, 3 CFEC.Ca3 NP~I,C~J3 NPOR,CN3 CFIC,CN3 CCL,CN3 LS~3.~b3 $8~2.hL3 ~HCB.HI,3 TE~S.~[,3 CFEC CFTC C(7L,C~.~3 PF:FS. PAGE: 2! 584,899 30.301 '999.250 420'653 '0'070 24.438 600.500 000 2655,000 512.029 36,51,5 '999.250 3~6,169 0.041 25,703 516,000 1.72~,000 ,331 2690,000 581.311 33 531. -999:250 397,708 0.105 12.523 !80,375 1829 000 4:034 2610.000 428,890 49.384 -999,250 250,580 -0 141 19~406 629,500 1791,000 2.180 2620.000 424.388 47,001 -999,250 259,513 0,072 24.391 IS Taoe verification !~i. stir')O rhlUmOer~er Alaska Co~:~utin(ii Cent~,r 17:28 22 177 375 R~'!OB HL3 9o0:500 0.072 662.500 !622 000 2 265 2630 000 ****: F!L~: TRA!LE~ **** KIbE ~iA~E : E.i):!T ,003 SERVICE : FLIC DAT~; : 01 105117 MAX ~EC SIZE : FILE TYPE : LaST F ~I t.,E SE~¥ICE NA~iE : F~OIT D.A T~ : 9!/05/!7 ORIG!~ : FLIC TnPF~ ~A~5: : 74564 pREViCUS 'r.A p {:~: : **** REEL TRAILER **** SFRVIC~: i,~A~.~E : FPIT DAFE'i : 9J./OS/J 7 OR!GI~ : FL!C R~KI~ NA~F : 74564 PP~:V!OtJS REEl, CO;'*)~rF~ : A~C~; aLASE~ , I~.,~~ KI~p~NIJF t'~ ] V~':~, 11;-1 f!, 50-02q-221 45 . , .~ x . ,. .. , .... , ~ ~ ~ . ,. ., . , . ._ . ......