HomeMy WebLinkAbout2071487. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU L-219
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
207-148
50-029-23376-00-00
12240
Conductor
Surface
Intermediate
Production
Liner
4840
80
4482
12206
10400
20"
9-5/8"
7"
4764
30 - 110
29 - 4511
26 - 12232
30 - 110
29 - 2586
26 - 4839
10754
3090
5410
10400, 10737
5750
7240
8435 - 12069
3-1/2" 9.2# L80 24 - 10744
4341 - 4836
Structural
3-1/2" HES AHR Dual Feed Packers 8398, 4328 / 8722, 4436
8398, 8722, 9136, 9362, 9905, 10631
4328, 4436, 4547, 4604, 4727, 4773
Torin Roschinger
Area Operations Manager
Brodie Wages
David.Wages@hilcorp.com
907.564.5006
PRUDHOE BAY, SCHRADER BLUFF OIL, ORION
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028238
24 - 4777
N/A
N/A
1016
1289
750
400
1739
494
N/A
13b. Pools active after work:SCHRADER BLUFF OIL, ORION
3-1/2" HES AHR Single Feed Packers 9136, 4547 / 9362, 4604 / 9905, 4727 / 10631, 4773
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 1:32 pm, May 17, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.05.17 13:27:45 -08'00'
Torin Roschinger
(4662)
DSR-5/17/23
RBDMS JSB 072723
WCB 1-4-2024
ACTIVITY DATE SUMMARY
5/12/2023
LRS CTU #2- 1.50" Blue Coil Job Objective; Set XX plug
MIRU CTU. Make up 2.80" JSN and RIH. Tagged in sta#2 and X nipple at 10615'.
Consult with OE and decide to set CIBP. PUH and flag pipe at 10400'. POOH. Make
up and RIH with NS CIBP (max OD: 2.5").
***Job Continued on 5/13/2023***
5/13/2023
LRS CTU #2- 1.50" Blue Coil Job Objective; Set CIBP
Continue RIH with NS CIBP (max OD: 2.5"). Set CIBP at 10400. POOH. Well failed
a negative pressure test. OOH with CIBP setting BHA, all looks normal. Relay
results to OE, and slickline to diagnose. Pad op notified to not POI until after slickline
work. Begin rig down. Well freeze protected with 34 bbl of diesel.
***Job Complete***
Daily Report of Well Operations
PBU L-219
The CIBP is correctly shown on the new WBS, below. -WCB
jg
MIRU CTU. Make up 2.80" JSN and RIH. Tagged in sta#2 and X nipple at 10615'.gg
Consult with OE and decide to set CIBP. PUH and flag pipe at 10400'. POOH. Make
up and RIH with NS CIBP
j
Continue RIH with NS CIBP (max OD: 2.5"). Set CIBP at 10400. POOH. Well failed
a negative pressure test.
C