Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2071487. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU L-219 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 207-148 50-029-23376-00-00 12240 Conductor Surface Intermediate Production Liner 4840 80 4482 12206 10400 20" 9-5/8" 7" 4764 30 - 110 29 - 4511 26 - 12232 30 - 110 29 - 2586 26 - 4839 10754 3090 5410 10400, 10737 5750 7240 8435 - 12069 3-1/2" 9.2# L80 24 - 10744 4341 - 4836 Structural 3-1/2" HES AHR Dual Feed Packers 8398, 4328 / 8722, 4436 8398, 8722, 9136, 9362, 9905, 10631 4328, 4436, 4547, 4604, 4727, 4773 Torin Roschinger Area Operations Manager Brodie Wages David.Wages@hilcorp.com 907.564.5006 PRUDHOE BAY, SCHRADER BLUFF OIL, ORION Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028238 24 - 4777 N/A N/A 1016 1289 750 400 1739 494 N/A 13b. Pools active after work:SCHRADER BLUFF OIL, ORION 3-1/2" HES AHR Single Feed Packers 9136, 4547 / 9362, 4604 / 9905, 4727 / 10631, 4773 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:32 pm, May 17, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.05.17 13:27:45 -08'00' Torin Roschinger (4662) DSR-5/17/23 RBDMS JSB 072723 WCB 1-4-2024 ACTIVITY DATE SUMMARY 5/12/2023 LRS CTU #2- 1.50" Blue Coil Job Objective; Set XX plug MIRU CTU. Make up 2.80" JSN and RIH. Tagged in sta#2 and X nipple at 10615'. Consult with OE and decide to set CIBP. PUH and flag pipe at 10400'. POOH. Make up and RIH with NS CIBP (max OD: 2.5"). ***Job Continued on 5/13/2023*** 5/13/2023 LRS CTU #2- 1.50" Blue Coil Job Objective; Set CIBP Continue RIH with NS CIBP (max OD: 2.5"). Set CIBP at 10400. POOH. Well failed a negative pressure test. OOH with CIBP setting BHA, all looks normal. Relay results to OE, and slickline to diagnose. Pad op notified to not POI until after slickline work. Begin rig down. Well freeze protected with 34 bbl of diesel. ***Job Complete*** Daily Report of Well Operations PBU L-219 The CIBP is correctly shown on the new WBS, below. -WCB jg MIRU CTU. Make up 2.80" JSN and RIH. Tagged in sta#2 and X nipple at 10615'.gg Consult with OE and decide to set CIBP. PUH and flag pipe at 10400'. POOH. Make up and RIH with NS CIBP j Continue RIH with NS CIBP (max OD: 2.5"). Set CIBP at 10400. POOH. Well failed a negative pressure test. C