Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-0291. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Seal Wellhead Packoff Void Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 12,995 feet NA feet true vertical 10,609 feet NA feet Effective Depth measured 12,920 feet 11,217 feet true vertical 10,551 feet 9,251 feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# / L-80 11,301' 9,315' Packers and SSSV (type, measured and true vertical depth) 4-1/2" Otis SSSV See Above 1,554' MD / 1,554' TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Same 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Operations Engineer Contact Phone: 9-5/8"x4-1/2" TIW HBBP Packer NA Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 N/A measured true vertical Packer MD 100' Size 100' 2,520' Length Liner 1,529' 1,738' Casing Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf 0 9518 5500 0 20749414 2104 TVD 9-5/8" 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 190-029 50-029-22020-0000 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: 13-3/8" ADL0034633, ADL0034636 ENDICOTT / ENDICOTT OIL DUCK IS UNIT MPI 1-69 Plugs Junk measured measured Conductor 9,485' 10,596' 11,522' 12,978' 9,993' 2,522'Surface Intermediate Intermediate 30" 9-5/8" 100' 2,520' 9,993' 8,332' 5,090psi 7,830psi 5,020psi 6,870psi 8,150psi 9,690psi 4,760psi Burst NA Collapse NA 2,260psi Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Kayla Junke at 2:02 pm, May 10, 2023 Digitally signed by Brenden Swensen (005774) Date: 5/9/23 1:57:11 PM Brenden Swensen (005774) RBDMS JSB 051623 DSR-5/10/23WCB 12-5-2024 Well Name Rig API Number Well Permit Number Start Date End Date END 1-69 Wells Support 50-029-22020-00-00 190-029 4/12/2023 4/13/2023 4/12/2022 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary T/I/O = 3600/10/10. Temp = 120*. Greenstick IC test void (Eval IAxOA). On PWI. Sting into IC test void (0 psi). Bled IAP & OAP to 0 psi, test void bled to 0 psi (1.5 hrs). Replace Alemite fittings with 1/4 turn Hoke valves in test ports. RU PKG gun to test port in the 9:00 position. Pumped 8 gun loads of Greenstick plastic into IC test void. Rigged pump and equipment back, will continue in the AM. 4/13/2022 - Thursday T/I/O = 3600/0+/0+. Temp = 120*. Green stick IC test void (Eval IAxOA). On PWI. RU PKG gun to IC test void in the 9:00 position. Pumped 8 gun loads of Green stick packing into test void, good returns from off side port. Packed test void with final pkg gun, held pack for 2 hrs. Test void will not take any more packing. Pumped 8 gun loads of Green stick packing into test void, good returns from off side port. Packed test void with final pkg gun, held pack for 2 hrs. Test void will not take any more packing RU PKG gun to test port in the 9:00 position. Pumped 8 gun loads of Greenstick plastic into IC test voi 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 12,995 feet NA feet true vertical 10,609 feet NA feet Effective Depth measured 12,899 feet 11,217 feet true vertical 10,535 feet 9,251 feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# / L-80 11,301' 9,315' Packers and SSSV (type, measured and true vertical depth) 4-1/2" Otis SSSV See Above 1,554' MD / 1,554' TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: Same 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Operations Manager Contact Phone: Burst NA Collapse NA 2,260psi 5,090psi 7,830psi 5,020psi 6,870psi 8,150psi 9,690psi 4,760psi Conductor 9,485' 10,596' 11,522' 12,978' 9,993' 2,522'Surface Intermediate Intermediate 30" 9-5/8" 100' 2,520' 9,993' 8,332' ADL0034633, ADL0034636 ENDICOTT / ENDICOTT OIL DUCK IS UNIT MPI 1-69 Plugs Junk measured measured TVD 9-5/8" 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 190-029 50-029-22020-0000 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: 13-3/8" Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf 100 8965 12500 0 22822154 2251 N/A measured true vertical Packer MD 100' Size 100' 2,520' Length Liner 1,529' 1,738' Casing 9-5/8"x4-1/2" TIW HBBP Packer 322-675 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Torin Roschinger torin.roschinger@hilcorp.com 406-570-9630 Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov SBy Samantha Carlisle at 12:49 pm, Mar 06, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.03.06 11:09:12 -09'00' Torin Roschinger (4662) RBDMS JSB 030923 DSR-3/7/23WCB 1-13-2025 Well Name Rig API Number Well Permit Number Start Date End Date END 1-69 CTU #9 50-029-22020-00-00 190-029 2/2/2023 2/17/2023 2/12/2023 - Sunday Eline. JOB CONTINUES FROM 11 FEB 23 WSR. (ADPERF) PERFORATE 12816-12846 WITH 2.875" 6 SPF 60 PHASE HSC MAXFORCE CHARGES. CCL-TS=21.2', CCL STOP 12794.8'. PERFORATE 12786-12816 WITH 2.875" 6 SPF 60 PHASE HSC MAXFORCE CHARGES. CCL-TS=21.2', CCL STOP 12764.8'. 2/13/2023 - Monday Eline. JOB CONTINUES FROM 12FEB23 WSR. (ADPERF). PERFORATE 12756-12786 2.875" 6SPF 60PHASE HSC WITH MAXFORCE CHARGES. CCL-TS=21.2', CCL STOP 12734.8'. PERFORATE 12726-12756 2.875" 6SPF 60PHASE HSC WITH MAXFORCE CHARGES. CCL-TS=21.2', CCL STOP 12704.8' 2/3/2022 - Friday CTU #9 1.75" Coiled Tubing (0.156 Wall). Job Scope: FCO, log, Ext Adperf. Continue RIH with BOT Milling assembly and Hailey Under Reamer w/ 6.187" blades and 3.7" Mill on the bottom without well flowing. Set down at same spot 11165' CTM. Try to work thru but unsuccessful. Discuss with OE. Decide to POOH and remove stabilzer from BHA. RBIH. Under ream/FCO to 12,860'. Chase out. Open circ sub then pull into tubing. POOH pumping. 2/1/2022 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 2/2/2022 - Thursday CTU #9 1.75" Coiled Tubing (0.156 Wall). Job Scope: FCO, log, Ext Adperf. MIRU CTU#9. MU BOT Milling assembly and Hailey Under Reamer w/ 6.187" blades and 3.7" Mill on the bottom. RIH with the well flowing to production. Set down 11,165' ctmd. Tried working past with no success. POOH to reconfigure. RBIH. Eline. JOB CONTINUES FROM 10 FEB 23 WSR. (ADPERF) PERFORATE 12869'-12899' 2.875" 6 SPF 60 PHASE W/MAXFORCE CHARGES. CCL-TS=21.2', CCL STOP 12847.8'. CTU #9 1.75" Coiled Tubing (0.156 Wall) Job Scope: FCO, log, Ext Adperf. At surface, freeze protect lines and well. Cut pipe then MU BOT MHA and HES logging tools. Tag TD, 12,866' ctmd. Perform tie in log. POOH. Good data. Corrected PBTD 12,904'. Kill line check valve not testing- replace several times before good test. Pump Slick Seawater for well kill. 2/4/2022 - Saturday Eline. WELL SHUT IN ON ARRIVAL. (ADPERF). MIRU E-LINE. PT PCE 300PSI LOW, 2100 PSI HIGH. ATTEMPT TO PERFORATE 12869-12899 BUT MISSRUN DUE TO GASSED UP GUN. 2/11/2022 - Saturday 2/5/2023 - Sunday CTU #9 1.75" Coiled Tubing (0.156 Wall) Job Scope: FCO, log, Ext Adperf. Loaded the well with seawater. Pressures would not bleed to zero. Bled back. Still posotive WHP. IA pressure was higher than thought. Bled IA down. Loaded the well again with 300 bbls Seawater. WHP still high after load. Discuss with OE and decide to RDMO. Job Not completed, Perfing passed to Eline. 2/10/2022 - Friday The perf inervals shot are within the approved intervals from Sundry 322-675. -WCB Well Name Rig API Number Well Permit Number Start Date End Date END 1-69 CTU #9 50-029-22020-00-00 190-029 2/2/2023 2/17/2023 Hilcorp Alaska, LLC Weekly Operations Summary ELine. PERFORATE 12685-12705 WITH 2.875" 6SPF 60PHASE HSC W/MAXFORCE CHARGES. CCL-TS=9.1', CCL STOP AT 12675.9. PERFORATE 12630-12647 WITH 2.875" 6SPF 60PHASE HSC W/MAXFORCE CHARGES. CCL-TS=11.5'', CCL STOP AT 12618.5. RDMO E-LINE. WELL SHUT IN ON DEPARTURE. JOB COMPLETE. 2/16/2022 - Thursday WELL INJECTING ON ARRIVAL, DSO NOTIFIED. SET 4-1/2" SLIP STOP CATCHER AT 4,210' SLM. PULL ST# 2 RM-OGLV @ 4,064' MD. T-BIRD PUMPS 220 BBLS DIESEL DOWN IA. TBG HYDRATED OFF AT 13', T-BIRD PUMPS 5 BBLS METH DOWN TBG, HANG UP AT 8'. BRING WELL ON-INJECTION TO THAW TBG. T-BIRD F/P TBG W/ 5 BBL 60/40, 20 BBL DIESEL. SET ST# 2 RM-DGLV @ 4,064' MD. 2/17/2022 - Friday CONT WSR FROM 2-16-23. (glv c/o, set mcx-sssv). PULL 4-1/2" SLIP STOP CATCHER FROM 4,210' SLM. SET 4-1/2" MCX IN SVLN AT 1,554' MD (40" oal, x-eq dev 8 x 1/8" ports, 2nd lkdwn installed, 1 set std pkg, .75" bean, no s/n). CONDUCT SUCESSFUL DRAW DOWN TEST W/ PAD OP. WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED. 2/14/2023 - Tuesday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y Anne Prysunka at 10:19 am, Nov 28, 2022  'LJLWDOO\VLJQHGE\7RULQ 5RVFKLQJHU  '1FQ 7RULQ5RVFKLQJHU   RX 8VHUV 'DWH  7RULQ5RVFKLQJHU  SFD 11/29/2022 MGR07DEC22 DSR-11/28/22 10-404 ADL0034633, SFD 11/29/2022GCW 12/08/22 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.12.08 11:13:19 -09'00' RBDMS JSB 031524   tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ   tĞůůEĂŵĞ͗ŶĚŝĐŽƚƚϭͲϲϵW/EƵŵďĞƌ͗ϱϬϬϮϵϮϮϬϮϬϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KŶůŝŶĞ͕KƉĞƌĂďůĞZŝŐ͗^ůŝĐŬůŝŶĞͬŽŝů ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϬϭͬϬϭͬϮϬϮϯƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϰĚĂLJƐ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ĂƌĐŝ,ŽƌŶĞƌϮϮϳͲϯϬϯϲ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗dŽƌŝŶZŽƐĐŚŝŶŐĞƌ;ϰϬϲͿϱϳϬͲϵϲϯϬ;ĐͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ƌŽĐŬZƵƐƚ;ϲϭϱͿϯϬϲͲϵϱϬϵ;ĐͿ  ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϰ͕ϬϬϬƉƐŝΛϭϬ͕ϬϬϬ͛dsϳ͘ϳWW'ͮĂƐĞĚŽŶĂĚũĂĐĞŶƚǁĞůů͛Ɛ ,W DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϰ͕ϭϬϬƉƐŝΛϭϬ͕ϬϬϬ͛dsϳ͘ϵWW'ͮǀĞƌĂŐĞhƉƉĞƌ^ƵďnjŽŶĞ &Ϯ͕&ϯĂŶĚ&ϰ,WͿ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϯ͕ϭϬϬƉƐŝ   ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ^/t,W͗   Ϯ͕ϯϬϬƉƐŝ   ;dĂŬĞŶŽŶϭϭͬϭϱͬϮϬϭϭͿ DŝŶ/͗ϯ͘ϳϮϱ͟ϰͲϭͬϮ͟yEEŝƉƉůĞΛϭϭ͕ϮϵϬ͛D DĂdžŶŐůĞ͗   ϰϰĞŐΛϰ͕ϱϬϱ͛ dŝĞ/Ŷ>ŽŐ͗ ^>ĞŵĞŶƚŽŶĚ>ŽŐDĂƌͲϯϬϭϵϵϬ  ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ EϭͲϲϵŝƐĂƉƌŽĚƵĐĞĚǁĂƚĞƌŝŶũĞĐƚŽƌĚƌŝůůĞĚŝŶƉƌŝůϭϵϵϬĂŶĚƉĞƌĨŽƌĂƚĞĚŝŶƚŚĞ&Ϯ͕&ϯĂŶĚ&ϰ͘,ŝƐƚŽƌŝĐĂůůLJƚŚĞ ǁĞůůŚĂƐŚĂĚǀĞƌLJůŝƚƚůĞǁĞůůǁŽƌŬƉĞƌĨŽƌŵĞĚĂŶĚŶŽŝŶƚĞŐƌŝƚLJŝƐƐƵĞƐŶŽƚĞĚ͘/ƚ͛ƐďĞĞŶĂĐŽŶƐŝƐƚĞŶƚϯϬϬϬďǁƉĚ ǁĂƚĞƌŝŶũĞĐƚŽƌĨŽƌƚŚĞƉĂƐƚϭϬͲϭϱLJĞĂƌƐ͘/ŶϮϬϬϵ͕ƐůŝĐŬůŝŶĞƚĂŐŐĞĚĨŝůůŝŶƚŚĞĐĂƐŝŶŐĂƚϭϮ͕ϰϴϮ͛ƐůŵĚŝŶĚŝĐĂƚŝŶŐƚŚĂƚ ĨŝůůǁŝůůŶĞĞĚƚŽďĞƌĞŵŽǀĞĚƉƌŝŽƌƚŽĂĚĚŝŶŐƉĞƌĨƐ͘  KďũĞĐƚŝǀĞƐ͗ dŚĞŽďũĞĐƚŝǀĞŽĨƚŚŝƐƉƌŽĐĞĚƵƌĞŝƐƚŽƉĞƌĨŽƌŵĂĨŝůůĐůĞĂŶŽƵƚƚŽĞdžƉŽƐĞƚŚĞ<Ϯ͕^ϯϭ͕Ϯ͕ϯĂŶĚϰƐŽƚŚĂƚ ĞdžƚĞŶĚĞĚĂĚĚƉĞƌĨƐĐĂŶďĞƐŚŽƚƚŽŝŶĐƌĞĂƐĞǁĂƚĞƌŝŶũĞĐƚŝŽŶŝŶƚŚĞĂƌĞĂ͘  WƌŽĐĞĚƵƌĞ͗ ^ůŝĐŬůŝŶĞ  ϭ͘ZhĂŶĚƉƵůůϰͲϭͬϮ͟Dy^^^sĂƚϭϱϱϰ͛͘ Ϯ͘ƌŝĨƚƚŽdĂŶĚŽďƚĂŝŶĂƐĂŵƉůĞ͘ ϯ͘WƵůů'>sƐŝŶ^dηϭĂŶĚϮĂŶĚƐĞƚŐĞŶĞƌŝĐŐĂƐůŝĨƚĚĞƐŝŐŶ͘;dŚĞŐĂƐůŝĨƚǀĂůǀĞƐǁŝůůďĞƐĞƚƚŽĂƐƐŝƐƚ ůŝĨƚŝŶŐƐŽůŝĚƐĚƵƌŝŶŐƚŚĞĐŽŝůĨŝůůĐůĞĂŶŽƵƚ͘Ϳ  ŽŝůĞĚdƵďŝŶŐ  ϭ͘WƌŝŽƌƚŽĂƌƌŝǀĂů͕ĐŽŶĨŝƌŵƚŚĂƚŐĂƐůŝĨƚŝƐŚŽŽŬĞĚƵƉƚŽƚŚĞ/ŽĨϭͲϲϵĨƌŽŵĞŝƚŚĞƌϭͲϲϯŽƌϮͲϲϴƚŽĂƐƐŝƐƚ ůŝĨƚŝŶŐƚŚĞƐŽůŝĚƐĚƵƌŝŶŐƚŚĞ&K͘ůƐŽ͕ŚĂǀĞŚĂƌĚůŝŶĞZhĨƌŽŵϭͲϲϵƚŽĂĚũĂĐĞŶƚWƌŽĚƵĐĞƌϭͲϲϱƚŽƚĂŬĞ ŝŶŝƚŝĂůƌĞƚƵƌŶƐƚŽƉƌŝŽƌƚŽƚĂŬŝŶŐƐŽůŝĚƐƚŽƚĂŶŬƐ͘ Ϯ͘hƉŽŶZh͕ǁŽƌŬǁŝƚŚKƉĞƌĂƚŝŽŶƐƚŽďĞŝŶŐŐĂƐůŝĨƚŝŶŐϭͲϲϵĂŶĚƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽϭͲϲϱ͘ ϯ͘DhhZ,ǁŝƚŚďůĂĚĞƐƐŝnjĞĚĨŽƌϳ͕͟ϮϵηĐĂƐŝŶŐ͘Z/,ĂŶĚĚƌLJƚĂŐĨŝůů͘ ϰ͘ĨƚĞƌƚĂŐĚĞƉƚŚŝƐĞƐƚĂďůŝƐŚĞĚ͕Wh,ĂŶĚŽďƚĂŝŶĨƌĞĞƐƉŝŶƉƌŝŽƌƚŽĐůĞĂŶŝŶŐŽƵƚ͘ĞŐŝŶĐůĞĂŶŝŶŐŽƵƚĨŝůů ĚŽǁŶƚŽWdĂƚϭϮ͕ϴϵϵŵĚƉƵŵƉŝŶŐŐĞůƐǁĞĞƉƐĂƐŶĞĐĞƐƐĂƌLJƚĂƌŐĞƚŝŶŐϭ͗ϭƌĞƚƵƌŶƐĚƵƌŝŶŐ&K͘ ϱ͘ĨƚĞƌƌĞĂĐŚŝŶŐWd͕ĐŚĂƐĞƌĞƚƵƌŶƐƵƉŶĞĂƌƚŚĞddΛϭϭ͕ϯϬϭŵĚ͕ĚƌŽƉĂďĂůůƚŽŽƉĞŶƚŚĞĐŝƌĐƐƵďĂŶĚ WKK,ĐŚĂƐŝŶŐƌĞƚƵƌŶƐƚŽƐƵƌĨĂĐĞ͘   tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  ϲ͘KŶĐĞĂƚƐƵƌĨĂĐĞ͕^/ƚŚĞŐĂƐůŝĨƚĂŶĚĚŝƐĐŽŶŶĞĐƚƚŚĞƐŽƵƌĐĞƚŽĂůůŽǁƚŚĞǁĞůůƚŽďĞŐŝŶĚLJŝŶŐŽĨĨ͘ ŽŶƚŝŶƵĞƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽϭͲϲϱƚŽƌĞĚƵĐĞt,WƉƌŝŽƌƚŽůŽĂĚŝŶŐǁĞůůĨŽƌƉĞƌĨŽƉĞƌĂƚŝŽŶƐ͘ ϳ͘^/ǁĞůůĂŶĚ&WƚŽƉŽĨǁĞůůĂŶĚƐƵƌĨĂĐĞůŝŶĞƐĂƐŶĞĐĞƐƐĂƌLJ͘/Ĩt^^ĐŚŽƐĞƐƚŽůŽĂĚĂŶĚŬŝůůƚŚĞǁĞůůƉƌŝŽƌ ƚŽŵĂŬŝŶŐƵƉŐƵŶƐ͕ĚŽŶŽƚ&WǁĞůůƵŶƚŝůĂĨƚĞƌŚĞǁĞůůŚĂƐďĞĞŶůŽĂĚĞĚ͘  dŚĞĨŽůůŽǁŝŶŐKƉĞƌĂƚŝŽŶƐƌĞƋƵŝƌĞĂŶĂƉƉƌŽǀĞĚ^ƵŶĚƌLJ͗  EŽƚĞƐ͗ xZĞŵŽƚĞŐĂƐŵŽŶŝƚŽƌŝŶŐĨŽƌ,Ϯ^ĂŶĚ>>ƐĂƌĞƌĞƋƵŝƌĞĚĨŽƌKƉĞŶ,ŽůĞĞƉůŽLJŵĞŶƚKƉĞƌĂƚŝŽŶƐ xƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨdžƚĞŶĚĞĚWĞƌĨŽƌĂƚŝŶŐũŽďƐ͕ϮϰͲŚŽƵƌĐƌĞǁĂŶĚt^^ ĐŽǀĞƌĂŐĞŝƐƌĞƋƵŝƌĞĚ͘ xdŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞŝŶŝƚŝĂůƉĞƌĨƐŐƵŶƐ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞ ĚƵƌŝŶŐƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJ ďƵůůŚĞĂĚŝŶŐŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘/ĨƉƌĞƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌ ƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚƚŚĞ ƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞĨŝƌŝŶŐŚĞĂĚ͘  ϴ͘ĨƚĞƌDhD,ĂŶĚƉƵůůƚĞƐƚŝŶŐƚŚĞd͕ƚĂŐͲƵƉŽŶƚŚĞdƐƚƌŝƉƉĞƌƚŽĞŶƐƵƌĞ,ĐĂŶŶŽƚƉƵůůƚŚƌŽƵŐŚ ƚŚĞďƌĂƐƐƵƉŽŶWKK,ǁŝƚŚŐƵŶƐ͘ ϵ͘ƵůůŚĞĂĚΕϮϲϬďďůƐϭй<>ͬ^tĚŽǁŶƚƵďŝŶŐ͘EŽƚĞŝŶũĞĐƚŝǀŝƚLJƉƌĞƐƐƵƌĞĂƚϯďƉŵĂĨƚĞƌϮϭϱďďůƐĂǁĂLJ͘ DĂdžƚƵďŝŶŐƉƌĞƐƐƵƌĞϮϱϬϬƉƐŝ͘;dŚŝƐƐƚĞƉĐĂŶďĞƉĞƌĨŽƌŵĞĚĂŶLJƚŝŵĞƉƌŝŽƌƚŽŽƉĞŶͲŚŽůĞĚĞƉůŽLJŵĞŶƚ ŽĨƚŚĞƉĞƌĨŐƵŶƐ͘dŝŵŝŶŐŽĨƚŚĞǁĞůůŬŝůůŝƐĂƚƚŚĞĚŝƐĐƌĞƚŝŽŶŽĨƚŚĞt^^͘Ϳ Ă͘tĞůůďŽƌĞǀŽůƵŵĞƚŽƚŽƉƉĞƌĨсϮϭϱďďůƐ ď͘ϰͲϭͬϮ͟dƵďŝŶŐʹϭϭ͕ϯϬϭ͛yϬ͘ϬϭϱϮсϭϳϮďďů Đ͘ϳ͟ĂƐŝŶŐʹϭ͕ϭϱϳ͛y͘ϬϯϳϭďƉĨсϰϯďďůƐ ϭϬ͘DhĂŶĚZ/,ǁŝƚŚůŽŐŐŝŶŐƚŽŽůƐĂŶĚĚƌŝĨƚ,͗ϮͲϳͬϴ͟ŶŽnjnjůĞ͘ ϭϭ͘&ůĂŐƉŝƉĞĂƐĂƉƉƌŽƉƌŝĂƚĞƉĞƌt^^ĨŽƌĂĚƉĞƌĨͬWƌƵŶƐ͘ ϭϮ͘WKK,ĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘ ϭϯ͘ŽŶĨŝƌŵŐŽŽĚůŽŐĚĂƚĂ͘ ϭϰ͘ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘ ϭϱ͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞŽĨĨƚŽƌĞƚƵƌŶƚĂŶŬ͘<ŝůůǁĞůůǁͬ<t&Žƌϴ͘ϰƉƉŐϭй<ůĂƐ ŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂ ƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐƌĞͲĞƐƚĂďůŝƐŚĞĚ͘&ůƵŝĚƐ ŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞ ŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϭϲ͘ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐƵƉƐĂĨĞƚLJũŽŝŶƚǁŝƚŚd/tǀĂůǀĞĂŶĚƐƉĂĐĞŽƵƚďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁǁĞůů ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶ ƐƚƌŝŶŐ͘KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚŽƵƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞ ƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘ Ă͘ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞƉĞƌĨŐƵŶƐ ŽŶĞƚŝŵĞƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘ ϭϳ͘ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨdWŐƵŶƐƉĞƌƐĐŚĞĚƵůĞďĞůŽǁ͘ŽŶƐƚĂŶƚůLJ ŵŽŶŝƚŽƌĨůƵŝĚƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ ǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘  WĞƌĨ^ĐŚĞĚƵůĞ Ύ,^ϮͲϳͬϴ͟ŐƵŶƐǁĞƌĞƵƐĞĚƚŽĞƐƚŝŵĂƚĞĨŽƌƚŚŝƐũŽďĂŶĚĐĂůĐƵůĂƚĞŐƵŶǁĞŝŐŚƚƐ͘   tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  WĞƌĨ/ŶƚĞƌǀĂůWĞƌĨ>ĞŶŐƚŚ'ƵŶ>ĞŶŐƚŚtĞŝŐŚƚŽĨ 'ƵŶ;ůďƐͿ ϭϮϲϯϬͲϭϮϲϰϳ͛ ϭϳ͛ Ϯϲϵ͛ ϮϭϭůďƐ ;ϭϮ͘ϰƉƉĨͿ ϯϲ͛>E<Ϯϲϵ͛ϰϰϲ ϭϮϲϴϯͲϭϮϳϬϱ͛ϮϮ͛Ϯϲϵ͛Ϯϳϯ ϭϴ͛>E<Ϯϲϵ͛ϮϮϰ ϭϮϳϮϯͲϭϮϴϰϲ͛ϭϮϯ͛Ϯϲϵ͛ϭϱϮϲ ϭϱ͛>E<Ϯϲϵ͛ϭϴϲ ϭϮϴϲϭͲϭϮϴϵϵ͛ϯϴ͛Ϯϲϵ͛ϰϳϮ dŽƚĂů Ϯϲϵ͛ Ϯϲϵ͛ ;ǁͬ>E<ͿϯϯϯϲůďƐ  ϭϴ͘Z/,ǁŝƚŚƉĞƌĨŐƵŶĂŶĚƚŝĞͲŝŶƚŽĐŽŝůĨůĂŐĐŽƌƌĞůĂƚŝŽŶ͘WŝĐŬƵƉĂŶĚƉĞƌĨŽƌĂƚĞŝŶƚĞƌǀĂůƉĞƌWĞƌĨ^ĐŚĞĚƵůĞ ĂďŽǀĞ͘ Ă͘EŽƚĞĂŶLJƚƵďŝŶŐƉƌĞƐƐƵƌĞĐŚĂŶŐĞŝŶt^Z͘ ϭϵ͘ĨƚĞƌƉĞƌĨŽƌĂƚŝŶŐ͕Wh,ƚŽƚŽƉŽĨůŝŶĞƌŽƌŝŶƚŽƚƵďŝŶŐƚĂŝůƚŽĞŶƐƵƌĞĚĞďƌŝƐĚŽĞƐŶ͛ƚĨĂůůŝŶŽŶƚŚĞŐƵŶƐĂŶĚ ƐƚŝĐŬƚŚĞ,͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚĂŶĚƌĞͲŬŝůůŝĨŶĞĐĞƐƐĂƌLJďĞĨŽƌĞƉƵůůŝŶŐƚŽƐƵƌĨĂĐĞ͘ ϮϬ͘WƵŵƉƉŝƉĞĚŝƐƉůĂĐĞŵĞŶƚǁŚŝůĞWKK,͘^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘<ŝůůǁĞůůŝĨŶĞĐĞƐƐĂƌLJ͘ Ϯϭ͘ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐĂŶĚ^ƚĂŶĚŝŶŐKƌĚĞƌƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚ ĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶŽĨdWŐƵŶƐƚƌŝŶŐ͘ ϮϮ͘ŶƐƵƌĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞĂƐƐĞŵďůLJĂƌĞŽŶͲŚĂŶĚďĞĨŽƌĞďƌĞĂŬŝŶŐŽĨĨůƵďƌŝĐĂƚŽƌƚŽ>ŐƵŶ,͘ Ϯϯ͘ZDKdh͘ Ϯϰ͘&WƚŽƉŽĨǁĞůůǁŝƚŚϱďďůƐŽĨŵĞƚŚĂŶŽůƚƵƌŶŽǀĞƌƚŽKƉĞƌĂƚŝŽŶƐƚŽWK/͘  ^ƵŶĚƌLJƉƉƌŽǀĂůŶŽƚŶĞĞĚĞĚĨŽƌƚŚĞĨŽůůŽǁŝŶŐKƉĞƌĂƚŝŽŶƐ͗  ^ůŝĐŬůŝŶĞ  ϭ͘ZĞͲƐĞƚ'>sƐŝŶ^dηϭĂŶĚϮ͘^ĞƚϰͲϭͬϮ͟Dy^^^sĂƚϭϱϱϰ͛͘ Ϯ͘ZDK͘   ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ Ϯ͘WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ϰ͘^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϱ͘ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ϲ͘dŝĞ/Ŷ>ŽŐͬWĞƌĨ^ŚĞĞƚ      Make up PCE.   tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ        tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  WƌŽƉŽƐĞĚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ        tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  ŽŝůĞĚdƵďŝŶŐKWƐ     ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ    tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ                        tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ                        tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ  7LH,Q6/%&HPHQW%RQG/RJ0DUFK    tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ     tĞůů͗EϭͲϲϵ Wd͗ϭϵϬϬϮϵ W/͗ϱϬϬϮϵϮϮϬϮϬϬϬ    MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, June 1, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC 1-69 DUCK IS UNIT MPI 1-69 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 06/01/2023 1-69 50-029-22020-00-00 190-029-0 W SPT 9251 1900290 2313 2087 2095 2065 2083 0 0 0 0 4YRTST P Guy Cook 4/28/2023 Testing was completed with a Little Red Services pump truck and calibrated gauges. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:DUCK IS UNIT MPI 1-69 Inspection Date: Tubing OA Packer Depth 518 2494 2433 2418IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC230427141351 BBL Pumped:6 BBL Returned:6 Thursday, June 1, 2023 Page 1 of 1 9 9 9 9 9 9 99 9 9 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2023.06.01 15:00:32 -08'00' JLC 4/10/2023 RBDMS JSB 041123 Kyle Wiseman Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 02/21/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230221 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BCU 12A 50133205300100 214070 1/29/2023 HALLIBURTON PPROF END 1-69 50029220200000 190029 2/4/2023 HALLIBURTON COILFLAG END 1-69 50029220200000 190029 2/11/2023 HALLIBURTON PERF KU 14X-06 50133203420000 181092 1/27/2023 HALLIBURTON TEMP SRU 224-10 50133101380100 222124 2/3/2023 HALLIBURTON PPROF TBU D-09RD 50733201310100 181080 2/8/2023 READ LeakPointSurvey Please include current contact information if different from above. END 1-69 50029220200000 190029 2/4/2023 HALLIBURTON COILFLAG END 1-69 50029220200000 190029 2/11/2023 HALLIBURTON PERF CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. From:Rixse, Melvin G (OGC) To:AOGCC Records (CED sponsored) Subject:FW: [EXTERNAL] RE: END1-69 (PTD 190-029) API# 50-029-22020-00-00 - Extended Addperf Sundry Change Request Date:Monday, February 6, 2023 5:24:15 PM From: Torin Roschinger <Torin.Roschinger@hilcorp.com> Sent: Monday, February 6, 2023 8:52 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: RE: [EXTERNAL] RE: END1-69 (PTD 190-029) API# 50-029-22020-00-00 - Extended Addperf Sundry Change Request Mel, Thank you for the quick response and approval. We had 9.8ppg brine quoted to kill the well versus our original KWF in the sundry to be less than 8.3ppg. Thank you, Torin From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Sent: Monday, February 6, 2023 8:42 AM To: Torin Roschinger <Torin.Roschinger@hilcorp.com> Subject: [EXTERNAL] RE: END1-69 (PTD 190-029) API# 50-029-22020-00-00 - Extended Addperf Sundry Change Request Torin, Hilcorp is approved to eline perf with PCE as described below. What gradient of fluid would you require to kill the well? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: Torin Roschinger <Torin.Roschinger@hilcorp.com> Sent: Monday, February 6, 2023 8:38 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: END1-69 (PTD 190-029) API# 50-029-22020-00-00 - Extended Addperf Sundry Change Request Good morning Mel, CTU#9 is currently on End1-69 with the original job scope of performing a fill clean out with an underreamer and shooting extended addperfs. After completing a successful FCO, the well was loaded with 1%KCl to prepare for deploying perf guns. However, coil was unable to get the WHP knocked down to 0psi to deploy the guns. After getting quotes on heavier weight brine to load and kill the well, it’s been determined that eline will be more economic make single gun runs versus expensive brine costs and standing by with the coil unit while brine is weighted up. I’d like to seek the AOGCC’s approval for the following changes to Sundry 322-675. 1. Change the extended addperfs from being shot with coiled tubing to conventional pressure deployed eline addperfs and 2. Change the perf intervals to optimize gun runs with eline now that they will not be shot with coiled tubing. Please see the proposed perf interval changes in red below. Perf Interval Perf Length Gun Length Weight of Gun (lbs) 12630-12647’ No Changes 17’269’211lbs (12.4ppf) 36’ BLANK 269’446 12683-12705’ 12685-12705’ 22’ 20’269’273 18’ BLANK 269’224 12723-12846’ 12726-12846’ (4x30’ guns) 123’ 120’269’1526 15’ BLANK 269’186 12861-12899’ 12869-12899’ 38’ 30’269’472 Total 269’269’ (w/BLANK)3336lbs Thank you, Torin Roschinger Hilcorp Energy Alaska Alaska Islands Team - Operations Manager c. 406 570 9630 Torin.roschinger@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. State of Alaska Oil and Gas Conservation Commission Deficiency Report Location: Endicott DIU MPI 1-69 Date: 4/22/2019 - PTD: 1900290 Operator: Hilcorp Type Inspection: MIT Operator Rep: Larry McBride Inspector: Jeff Jones Position: Lead Operator Op. Phone: (907) 715-6950 Correct by (date): Op. Email: Imcbride@hilcorp.com Follow Up Req'd: Detailed Description of Deficiencies Date Corrected Slight crude oil leak @ stem seal on Valve -tech choke. Cleaned and tightened packing on choke. Deficiency report was received on 5/3/19. 4/26/2019 Attachments: none Robert L Anderson, Dan Wikner Operator Rep Signatures: AOGCC Inspector *After signing, a copy of this form is to be left with the operator. Follow-up Instructions Return a copy of this Deficiency Report to AOGCC (Attention: Inspection Supervisor) within 7 days of receipt. Include the "Date Corrected" and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up inspection was performed by AOGCC, include the date and name of Inspector. Extensions for corrective actions taking longer than the "correct by" date must be requested and accompanied by justification (Attention: Inspection Supervisor). Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action. �° 56/,9 Revised 2/2016 State of Alaska Oil and Gas Conservation Commission Deficiency Report Location: Endicott DIU MPI 1-69 Date: 4/22/2019 PTD: 1900290 Operator: Hilcorp Type Inspection: MIT Operator Rep: Larry McBride Inspector: Jeff Jones . Position: Lead Operator Op.Phone: (907)715-6950 Correct by (date): Op. Email: Imcbride@hilcoro.com Follow Up Req'd: Detailed Description of Deficiencies Date Corrected Slight crude oil leak @ stem seal on Valve -tech choke. - Attachments: none Signatures: Operator Rep AOGCC Inspector *After signing, a copy of this form is to be left with the operator. Follow-up Instructions Return a copy of this Deficiency Report to AOGCC (Attention: Inspection Supervisor) within 7 days of receipt. Include the "Date Corrected" and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up inspection was performed by AOGCC, include the date and name of Inspector. Extensions for corrective actions taking longer than the "correct by" date must be requested and accompanied by justification (Attention: Inspection Supervisor). Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action. Jg 51��th Revised 2/2016 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 8, 2019 TO: Jim Regg !� �-7� 5/el t l P.I. Supervisor SUBJECT: Mechanical Integrity Tests 11 HILCORP ALASKA LLC 1-69 FROM: Jeff Jones DUCK IS UNIT MPI 1.69 Petroleum Inspector Sre: Inspector Reviewed By: P.I. Supry �' NON -CONFIDENTIAL Comm Well Name DUCK IS UNIT MPI 1-69 Insp Num: mitJJ190503125222 Rel Insp Num: API Well Number 50-029-22020-00-00 Inspector Name: Jeff Jones Permit Number: 190-029-0 Inspection Date: 4/22/2019 Packer Depth Pretest Initial I5 Min 30 Min 45 Min 60 Min Well 1-69 Type Inj W "TVD 9251 Tubing zoa9 2045 2043 - 2044 — --- PTD — 1900290 _'Type Test SPT Test psi s-.. 2313 IA 535 2704 - 2639 _ 258 BBL Pumped: 58 BBL Returned. 5 3 OA 240 szo - 620 - 6s0 Interval 4vRTSr LP/IF P Notes: I well inspected, slight crude oil leak at Valve -tech choke stem seal. ("f"' -s 6QF;' (6'e -I rro'j- Wednesday, May 8, 2019 Page 1 of I • • Efi E !, Post Office Box 244027 JUL3 0 Anchorage,AK 99524-4027 Hilcorp Alaska,LLC U 2015 3800 Centerpoint Drive Suite 100 AOGCCAnchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission / qo _ ©g-q 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 1 .r ‘247 Re: Duck Island Unit Well Renaming Request SCANNED P (1, 12016 Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "I" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/134" (PTD # 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp • Orig • New API_WeliNo PermitNumber WellName WellNumber WellNumber 50029218010000 1880370 DUCK IS UNIT MPI 1-01/J19 1-01 50029226010000 1951500 DUCK IS UNIT MPI 1-03/P16 1-03 50029216050000 1861060 DUCK IS UNIT MPI 1-05/020 1-05 50029217430000 1870810 DUCK IS UNIT MPI 1-09/118 1-09 50029217430100 1970290 DUCK IS UNIT MPI 1-09A/L21 1-09A 50029221070000 1901570 DUCK IS UNIT MPI 1-11/SN4 1-11 50029223610000 1930560 DUCK IS UNIT MPI 1-15/P25 1-15 50029221000000 1901500 DUCK IS UNIT MPI 1-17/SN2 1-17 50029221000100 1961990 DUCK IS UNIT MPI 1-17A/117 1-17A 50029225690000 1950930 DUCK IS UNIT MPI 1-19/118 1-19 50029220050000 1900020 DUCK IS UNIT MPI 1-21/K25 1-21 50029225100000 1941280 DUCK IS UNIT MPI 1-23/015 1-23 50029217220000 1870420 DUCK IS UNIT MPI 1-25/N22 1-25 50029217220100 1970750 DUCK IS UNIT MPI 1-25A/K22 1-25A 50029216930000 1870090 DUCK IS UNIT MPI 1-27/P20 1-27 50029216690000 1861810 DUCK IS UNIT MPI 1-29/M25 1-29 50029225620000 1950720 DUCK IS UNIT MPI 1-31/M21 1-31 50029225770000 1951070 DUCK IS UNIT MPI 1-33/M23 1-33 50029225770100 1980870 DUCK IS UNIT MPI 1-33A/L24 1-33A 50029225770200 1982550 DUCK IS UNIT MPI 1-33B/L24 1-33B 50029225770300 2050040 DUCK IS UNIT MPI 1-33C/M24XX 1-33CXX 50029216720000 1861840 DUCK IS UNIT MPI 1-35/025 1-35 50029217480000 1870900 DUCK IS UNIT MPI 1-37/P24 1-37 50029218270000 1880630 DUCK IS UNIT MPI 1-39/P17 1-39 50029218270100 2061870 DUCK IS UNIT MPI 1-39A/N-16 1-39A 50029217130000 1870320 DUCK IS UNIT MPI 1-41/023 1-41 50029218640000 1881050 DUCK IS UNIT MPI 1-43/P26 1-43 50029219910000 1891240 DUCK IS UNIT MPI 1-45/Q26 1-45 50029216250000 1861310 DUCK IS UNIT MPI 1-47/Q21 1-47 50029216250100 1972030 DUCK IS UNIT MPI 1-47A/M20 1-47A 50029218410000 1880780 DUCK IS UNIT MPI 1-49/P21 1-49 50029223040000 1921190 DUCK IS UNIT MPI 1-51/V20 1-51 50029225010000 1941120 DUCK IS UNIT MPI 1-53/Q20 1-53 50029217880000 1880210 DUCK IS UNIT MPI 1-55/R25 1-55 50029218730000 1881140 DUCK IS UNIT MPI 1-57/R23 1-57 50029226440000 1960220 DUCK IS UNIT MPI 1-59/024 1-59 50029225200000 1941420 DUCK IS UNIT MPI 1-61/Q20 1-61 50029219050000 1890060 DUCK IS UNIT MPI 1-63/T22 1-63 50029226270000 1951880 DUCK IS UNIT MPI 1-65/N25 1-65 50029226270100 2032120 DUCK IS UNIT MPI 1-65A/N27 1-65A 50029219850000 1891140 DUCK IS UNIT MPI 1-67/T20 1-67 50029220200000 1900290 DUCK IS UNIT MPI 1-69/V19 1-69 50029215680000 1860630 DUCK IS UNIT MPI 2-02/P18 2-02 50029215850000 1860820 DUCK IS UNIT MPI 2-04/M19 2-04 50029216990000 1870180 DUCK IS UNIT MPI 2-06/J22 2-06 50029217710000 1880040 DUCK IS UNIT MPI 2-08/K16 2-08 50029223020000 1921170 DUCK IS UNIT MPI 2-12/Q16 2-12 50029216390000 1861490 DUCK IS UNIT MPI 2-14/016 2-14 50029218850000 1881340 ;DUCK IS UNIT MPI 2-16/M16 2-16 50029220320000 1900430 DUCK IS UNIT MPI 2-18/L16 2-18 50029220480000 1900600 DUCK IS UNIT MPI 2-20/L15 2-20 50029219310000 1890340 DUCK IS UNIT MPI 2-22/L14 2-22 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Thursday,April 30,2015 2e4�( 4 ( I I SUBJECT: Mechanical Integrity Tests P.I.Supervisor g Ty HILCORP ALASKA LLC 1-69/V 19 FROM: Bob Noble DUCK IS UNIT MPI 1-69/V19 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry-_J NON-CONFIDENTIAL Comm Well Name DUCK IS UNIT MPI 1-69NI9 API Well Number 50-029-22020-00-00 Inspector Name: Bob Noble Permit Number: 190-029-0 Inspection Date: 4/28/2015 Insp Num: mtRCN150428142428 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 1-69/V19 - Type Inj—i W TVD r 9251 Tubing 2100 1 2100 2100 - 2100 - PTD 1 1900290 (Type Test SPT Test psi 2313 • IA 1327 2800 ' 2770 - 2760 ' Interval 4 YRTST p/F I P ✓ OA 215 400 - 400 - 400 -j Notes: SCANNED MA?` 2 2 2015 Thursday,April 30,2015 Page 1 of 1 Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~--~ File Number of Well History File PAGES TO DELETE RESCAN [] Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds ~'"' Other 'f~/~~ .'1 Complete Scanned by: Bevedy ,.'~ Vincent Nathan Lowell T° RE-SCAN Notes: Re-Scanned by: Bevedy Bren Vincent Nathan Lowell Date: ~si NOTScanned.wpd UNSCANNED, OVERSIZED MATERIALS AVAILABLE: CSC» FILE # n (YeC.-{-i d ( Sc ue. I ° ►6 C� of y � To request any /all of the above information, please contact: Alaska Oil & Gas Conservation Commission 333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279 -1433 Fax (907) 276 -7542 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 /UP May 22, 2012 Mr. Jim Regg l 0 -0 p_1 ml Alaska Oil and Gas Conservation Commission � ,, bpi �q 333 West 7 Avenue _ ii Anchorage, Alaska 99501 Subject: Corrosion Corrosion Inhibitor Treatments of Endicott Row 1 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 1 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • . BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Endicott Row 1 Date: 09/24/2010 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na qal END1 -01 /J -19 1880370 50029218010000 1.5 0.3 0.5 9/2/2010 0.85 9/23/2010 END1 -03 / P -16 1951500 50029226018000 4.0 3.5 0.5 9/2/2010 5.10 9/23/2010 END1 -05 / 0 -20 1861060 50029216050000 0.3 NA 0.3 NA 1.70 9/23/2010 END1 -09 / L -21 1970290 50029217430100 6.0 5.0 0.5 8/28/2010 3.40 9/23/2010 END1 -15 / P -25 1930560 50029223610000 4.0 3.0 0.5 9/2/2010 6.80 9/23/2010 END1 -17 /1-17 1961990 50029221000100 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010 END1 -19 /1-18 1950930 50029225690000 7.0 9.3 0.5 9/2/2010 4.25 9/23/2010 END1 -21 / K -25 1900020 50029220050000 2.5 1.5 0.5 9/2/2010 1.70 9/23/2010 END1 -23 / 0 -15 1941280 50029225100000 12.0 12.5 0.5 9/2/2010 1.70 9/23/2010 END1 -25 / K -22 1970750 50029217220100 5.0 1.5 0.5 9/2/2010 5.10 9/23/2010 END1 -27 / P -20 1870090 50029216930000 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010 END1 -29 / M -25 1861810 50029216690000 2.0 1.3 0.5 9/2/2010 1.70 9/23/2010 END1 -31 / M -21 1950720 50029225620000 5.0 1.8 0.5 9/2/2010 13.60 9/23/2010 END1 -33 / L -24 1982550 50029225770200 1.5 0.3 0.5 9/2/2010 3.40 9/23/2010 END1 -35 / 0 -25 1861840 50029216720000 8.0 4.8 0.5 9/2/2010 3.40 9/23/2010 END1 -37 / P -24 1870900 50029217480000 0.5 NA 0.5 NA 4.25 9/23/2010 END1 -39A / N -16 2061870 50029218270100 0.5 NA 0.5 NA 6.80 9/23/2010 END1 -41 / 0 -23 1870320 50029217130000 8.0 5.2 0.5 9/2/2010 4.25 9/23/2010 END1 -43 / P -26 1881050 50029218640000 2.0 0.5 0.5 9/2/2010 3.40 9/23/2010 END1 -45 / Q -26 1891240 50029219910000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010 END1 -47A / M -20 1972030 50029216250100 1.0 0.1 0.5 9/2/2010 3.40 9/24/2010 END1 -49 / P -21 1880780 50029218410000 1.0 0.8 0.5 9/2/2010 3.40 9/24/2010 END1 -51 / V -20 1921190 50029223040000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010 END1 -53 / 0 -20 1941120 50029225010000 9.0 4.2 0.5 9/2/2010 1.70 9/24/2010 END1 -55 / R -25 1880210 50029217880000 1.3 0.1 0.5 9/2/2010 1.70 9/24/2010 END1 -57 / R -23 1881140 50029218730000 3.0 1.3 0.5 9/2/2010 5.10 9/24/2010 END1 -59 / 0 -24 1960220 50029226440000 3.0 1.3 0.5 9/2/2010 0.85 9/24/2010 END1 -61 /Q -20 1941420 50029225200000 8.0 6.8 0.5 9/2/2010 2.55 9/24/2010 END1 -63 / T -22 1890060 50029219050000 8.0 4.1 0.5 9/2/2010 2.55 9/24/2010 END1-65A / N-27 2032120 50029226270100 8.0 5.8 0.5 9/2/2010 3.40 9/24/2010 END1 -67 / T -20 1891140 50029219850000 0.5 NA 0.5 NA 1.70 9/24/2010 ____...7END1 -69 / V -19 1900290 50029220200000 15.0 10.3 0.5 9/2/2010 0.85 9/24/2010 MEMORANDUM • State of Alaska II Alaska Oil and Gas Conservation Commission TO: Jim Regg J DATE: Monday, May 09, 2011 ` P.I. Supervisor ' ` i 5 1 flit( SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 1-69/V19 FROM: Lou Grimaldi DUCK IS UNIT MPI 1- 69/V19 Petroleum Inspector Src: Inspector Reviewed By: Supry -J-- NON- CONFIDENTIAL Comm Well Name: DUCK IS UNIT MPI 1- 69/V19 API Well Number: 50- 029 - 22020 -00 -00 Inspector Name: Lou Grimaldi 1 Insp Num: mitLG110506150036 Permit Number: 190 -029 -0 Inspection Date: 5/6/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1- 69/V19 'Type Inj. I W `I TVD 9251 ' IA 690 2600 ' 2570 2560 - ( P.T.D 1900290 - TypeTest I SPT J Test psi I 2312 = OA 125 325 320 320 Interval 4YRTST P /F , P - Tubing 1900 _ 1900 1875 1875 1 Notes: 4.8 Bbl's Meoh pumped. Good test. , ti ry . S a r :t�','�I,� =II 1�,c ; .�- Monday, May 09, 2011 Page 1 of 1 MEMORANDUM '~ ~ C/ To: Jim Regg (~.~ti- ~' t I Z~~ u 7 P.I. Supervisor FROM: Chuck Scheve Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, September 12, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC I-69!V 19 DUCK IS UNIT MPI ]-69/V 19 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv~;=~ Comm Well Name: DUCK IS iJNIT MPI 1-69/v19 API Well Number: 50-029-22020-00-00 Inspector Name: Chuck Scheve Insp Num: mitcso709I1o63os1 Permit Number' ]90-029-0 - Inspection Date: 9is/2oo7 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1-69iv19 ',Type Inj. ~ ~' j TVD 9251 %j IA~ sw ~ zs2o ~ !, za7o 2a7o ~ P.T. 1900290 ~TypeTeSt , SPT TCSt pSl 2312.75 QA ~ ~ 180 380 ~ 380 I 380 i Interval 4YRTST per, P -~ Tllblrig ' 2550 1 25 0 2550 ~ 2550 Notes: Pretest pressures were observed and found stable. ~~,~? NOV ~ ~ 2007 Wednesday, September 12, 2007 Page 1 of 7 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner THRU: Jim Regg P.I. Supervisor~'~ ~/' ~/~-~ FROM' Lou Grimaldi Petroleum Inspector DATE: September 13, 2003 SUBJECT: Mechanical Integrity Tests BPX Endicott, MPI 2-22, 1-69, 1-67 Duck Island Unit Endicott Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. ~ WellI 2-22/L-14 IType,nj.IWAC IT.M.D. I 9474 I Tubingl 1200 i=~oo i~o I 2450 I,nterva, I vI P.T.D.I 189-034 I Type testI P I TestpsiI 2369 I CasingI 1200I 2500I 2460I 2450I P/F I P I Notes: Combo nMIT, plug set in T.T. @ 10,999' I We,,I l'69/V:lglTypelnj.IWACI T.V.D. I9249I T. bingl26o12500 12430 I ~0 I,,,~,v~,l 4 P.T.D.I 190-029 ITypetestl P ITestpsil 2312 I Casingl 2450 I 2450 I 2450 I 2450I P/FI P Notes: Observed pretest conditions for 30 minutes "OK". Welll 1'67/T-201Typelnj'I P IT'v'D' I 9255 I Tubingl 850 I 2500 I 2310 I 2210 Ilntervall 4 P.T.D.I 189-114 ITypetestl WAG ITestpsil 2314 I CasingI 3375I 3360I 3350I 3350I P/F F Notes: Observed pretest cond tions for 30 minutes - Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS I NJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Test's Details 2-22/L-14 passed its combo MIT. 1-69/V-19 passed its 4-year MIT. Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) 1-67/T-20 IA was not topped off prior to its MIT. Filled with 41 bbl's MEOH, pressured up three times with excessive bleed-off. Decline seemed to be getting less each time. Above reults were from last attempt. DHD will invetigate and report. M.I.T.'s performed: Three Attachments: Number of Failures: One Total Time during tests: 7 hours cc: Bill Rochine (BPX Endicott) Tom Maunder {A.O.G.C.C.) MIT report form 5/12/00 L.G. 2003-0913_M IT_D I U_2-22_lg .xls 9/15/2003 .,.-.-:. STATE OF ALASKA .-'--, ALP . OIL AND GAS CONSERVATION COMMI; ~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing Alter casing Repair well Perforate__ Other X 2. Name of Operator BP Ex~)loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora.(~e, Alaska 99519-6612 4. Location of well at surface 2238' SNL, 2229' WEL, Sec. 36, T12N, R 16E At top of productive interval 1483' SNL, 690' WEL, Sec. 02, T11N, R16E At effective depth 1763' SNL, 1115' WEL, Sec. 02, T11N, R 16E At total depth 1801' SNL, 1170' WEL, Sec. 02, T11N, R 16E 5. Type of Well: Development Exploratory Stratigraphic Service .. 6. Datum elevation (DF or KB) KBE = 55.10 feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 1-69/V- 19MPI 9. Permit numbedapproval number 90-29/90-670 10. APl number 50- 029-22020 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12995' feet 10609' BKB feet 12899' feet 10534' BKB feet Plugs (measured) Junk (measured) Perforation depth: Length Size Cemented Measured depth True vertical depth BKB BKB 61' 30" Driven 100' 100' 2482' 13-3/8" 3604 c.f. Permafrost 2521' 2518' 11483' 9-5/8" 2560 c.f. Class G 11522' 9484' 1738' 7" 855 c.f. Class G 11240' - 12978' 9267' - 10595' measured 12282'- 12288', 12376'- 12404', 12452'- 12458', 12354'- 12372', 12434'- 12443' true vertical (subsea) 10011'- 10016', 10082'- 10103', 10139'- 10144', 10066'- 10079', 10126'- 10132' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 with 4-1/2" tailpipe to 11301' Packers and SSSV (type and measured depth) 9-5/8" packer at 11217'; 4-1/2" SSSV at 1554' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressu~P~_MIr~°~9 ' ~) Anchoraq:: 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 415 24O6 Tubing Pressure 6179 6419 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas__ Suspended Service Wnfp. r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~, ~ ~7_~'~ Title TechnicalAssistant tV · Form 10-404 Rev 06/15~8~8' ' -" Date SUBMIT IN DUPI BPX Endicott Production Engineering Department MIT with AOGCC Witness DATE: 8-30-99 WELL N°-: 5-01,5-02, 2-16, 2-16, 1-6/4, 2-06, 2 . BP EXPLORATION REP: Peruzzi, Williams SERVICE COMPANY: APC pump truck with Beardsley, Neuman and Linberg Summary: On 8/28 and 8/29 all seven wells were fluid packed and pre-MIT'ed to 2500. All passed. On 8/30 a.m. all wells were witnessed by Chuck Scheve who filled out the data sheets attached. All passed. Attachments: State form Pump sheet for official MIT ¢ Well Pre-MIT diesel MIT diesel pumped Notes , pumped, BBLS , BBLS '5-01 9 3 5-02 5 7 2-34 I 8 2-06 6 4 used 60/40 for pre-MIT 2-16 54 15 pumped 120 barrels of 60/40 prior to pumpin~ diesel 4=84- ~-~<t 6 6 2-64 4 4 Summary: Pumped a total of'132 bbls of Diesel STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Hechanical Integrity Test OPERATOR: E4)X FIELD I UNIT t PAD: EndicoU:./.DZU/HP! DATE:. Diesel 9,354 4,400 4,_400 4,400 , 4,400 , 2-06 O P i~r~ne 12,238 _ 9 5~"147#_/NT-80 7. ...... .2p38~ .S '~,100 2,600 2'S~'_. _2,550 ...'t1:20 COMM~'NTS: PTO~ 87-18 Semi Annual 2-16 S _P We I'~o,10~ I O$ta"I47#1NT-80. 41/2" 2342.7Sl 500- 2,500 I 2,500_ I. 2,500 t 10:50 P _ COMMENTS: PTD~ 8,8-! 34 4Year 2-34 S P Brir~ 9'618 9518"147#!NT-80 _5_ ~' 22'18..5.,,,I 17..5o I 2550I 252.5,._! 2525 J t2:30 P C0~NTS:' PTD~ 86-172 Semi Annual 2_,-64 . S P Brine I 8984 .I 9 5t8" ! 47#/NT-80 ,.t, 1759 _1-- 4oo ' I .... 2525' ' 2500 .... 25~o 12:45 COMMENTS: ' , _ PTD~ 90-77 4Yea_r ....... 1-69 S, P Brine 1t217~ 95/8"/47#/NT-95HS 4 "2312,251 O t 25~)-'1 2450--I-:2.4_50 I 13:05 P :C0~MENTS: '- ' ....... PTD~ 90-29 4Year .... - - - - , ,. i i .~. i i ii iii ,llll, .., .., , TBG. tNJ. FLUID CODES F = FRESH WATER INJ. G = GA~ INJ. S = SALT WATER ~NJ. N = NOT INJECTING TEST TYPE: M = ANNULUS MONITORING P = STD ANNULUS PRESSURE TEST R = INTERNAL PAD, TRACER SURVEY A = TEHPERATURE ANONALY TEST D - DIFFERENTIAL TEMPERATURE TEST ANNULAR FLUID: P.P.G. DIESEL GLYCOL SALTWATER DR[LUNG MUD OTHER Grad. WEtJL. TEST: 0.00 inilfat r .0;0. D_ 4-Year X O,O0 Workover 0.00 Olher X o~. wen File C'~ G- c - Trip Rpt c- In--or OPERATOR REP SIGNATURE: Tare Pemz2J , AOGCC REP SIGNATURE: Chuck $cheve (Rev g~17/96) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical 'Integrity Test OPERATOR: BPX FIELD / UNIT f PAD; _ _ End[~o_Lt__/D[U / MP~] DATE: Diesel 8.944 4~100 4,100 ¢.100 4.I00 ' _ ._5:0! __ _G .... _P_ .... _Brine 10,842__*"-'--~ GS/9',f47#/L-80 7" 2236 1,650 2,500 2,400 .... 2,.4.0~.' ' 9:25 P COMMENTS: PTD~ 80-120 Semi At, ual .. 2,52_5_1 ~,525 I 2,525 I '9:45 . p.. COMMENTS: PT1:~81-118 Semi Annual COMMENTS:- ' · COMMENTS: -' ........... ,, ,, , , ,, TBG. INJ. FLUID CODES FRESH WATER [NJ. GAS INJ. SALT WATER INJ. N = NOT 'N0iECTING TEST TYPE; M = ANNULUS MONITORING P = STD ANNULUS PRESSURE TEST FI; = INTERNAL RAD. TRACER SURVEY A = TEMPERATURE ANOMALY TEST O = DJFFERENI"IAL TEMPE~~ 'TEST' ANNULAR FLUID: P.P.S. Grad. W~LL TEST: DIESEL J 0.00 In, al GLYCOL I 0.~)13'ii 4,-Year SALT WATER. ',i ___-l_- '-0'0~ ' Workover DRILLING MUD J 0.00- Other X ..... OTHER ....... J 0.00 Oi~d:ributi~n: c.'ig - wan File c - Opemtor c - ~base = - Trip R~ File c- OPERATOR REP SIS NATURE: Tave Peruzzl __ jkgk114gf, xJs , AOGCC REP SIGNATURE: (Rev 9117/96) STATE OF ALASKA AL~._ .,-~ OIL AND GAS CONSERVATION COMMISSk.,,, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Pull tubing Alter casing __ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2238' SNL, 2229' WEL, Sec. 36, T12N, R 16E At top of productive interval 1483' SNL, 690' WEL, Sec. 02, T11N, R16E At effective depth 1763'SNL, 1115' WEL, Sec. 02, T11N, R16E At total depth 1801'SNL, 1170' WEL, Sec. 02, T11N, R16E Stimulate __ Plugging__ Repair well __ 5. Type of Well: Development Exploratory Stratigraphic Service Perforate__ Other X /t,~ / ~'" 6. Datum elevation (DF or KB) KBE = 55.10 feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 1-69/V- 19MPI 9. Permit number/approval number 9O-29/90-670 10. APl number 50- 029-22020 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12995' feet Plugs (measured) true vertical 10609' BKB feet measured 12899' feet Junk (measured) true vertical 10534' BKB feet Length Size Cemented Measured depth True vertical depth BKB BKB 61' 30" Driven 100' 100' 2482' 13-3/8" 3604 c.f. Permafrost 2521' 2518' 11483' 9-5/8" 2560 c.f. Class G 11522' 9484' 1738' 7" 855 c.f. Class G 11240'- 12978' 9267'- 10595' measured 12282'- 12288', 12376'- 12404', 12452'- 12458', 12354'- 12372', 12434'- 12443' true vertical (subsea) 10011'- 10016', 10082'- 10103', 10139'- 10144', 10066'- 10079', 10126'- 10132' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 with 4-1/2" tailpipe to 11301' Packers and SSSV (type and measured depth) 9-5/8" packer at 11217'; 4-1/2" SSSV at 1554' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 1267 3227 Tubing Pressure 1548 1760 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 16. Status of well classification as: Oil __ Gas Suspended__ Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~Ined ~c/,¢(~//~/L,¢~ (~-.. ,/~-~~' TitleTech.icatAssis,a.,tt Form 10-40zi¢* Rev 06/15/88 SUBMIT IN DU'PLIECATE Endicott Production Engineering Department 4-YEAR MIT DATE: 10/8/95 WELL N-°: 1-69/V-19 BP EXPLORATION REP' R. CLUMP SERVICE COMPANY: HB & R / AOGCC REP: J. HERRING DATE/TIME OPERATIONS SUMMARY 1 030 MIRU HB & R TO IA. WHIP= 1650, lAP= 1180 PSI. PT LINE TO 3500 PSI. 1 043 START PUMPING DIESEL. 1 055 PUMPED 4 BBLS DIESEL. lAP= 2500 PSI. RDMO HB & R. START TEST. 1125 lAP= 2420 PSI. TEST IS GOOD. BLEED lAP TO 300 PSI LATER. PASSED (4) YEAR MIT. J. HERRING (AOGCC) WIT. LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 11 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 PLS/STP FINAL BL+RF 1PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 2628.07 Run # 1 3235.06 Run # 1 5669.05 Run # 1 5959.05 Run # 1 6217.14 Run # 1 6412.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or F~_o (907) 563-7803 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 25 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~'~-/~ ~-~v-~0 '1' 5- l? ~-o~-~ DESCRIPTION PLS FINAL BL+RF PFC/PERF FINAL BL+RF GR/CCL FINAL BL+RF PFC/PERF FNL BL+RF PFC/PERF FINAL BL+RF PLS/STP FINAL BL+RF ECC No. Run # 1 5937.08 Run # 1 ' 6397.05 Run # 1 6397.06 Run # 1 Run # 1 6397.07 Run # 1 6412.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and ~,e%urn ~! Pet · - -'~o~echnieal Data Cente~ BP Exploration (Alaska) In$ 900 East Benson Boulevard , ECEI'VED BLUELINE AND SEPIA INFORMATION TO THE STATE ENDICOTT FIELD ONLY WELL NAME DATE INTERVALS LOG NAME Bluelines to the State RUN NO COMPANY NAME 1-27/P-20~?-.-~' 6/1 3/92 9950'-10690' 1-37/P-24 o°?-"~° 6/27/92 12050'-12430' 1-57/R-23 o~'"1/~ 6/15/92 11600'-12389' 1-67/T-20~?-'//~ 6/2/92 10550'-11800' 1 -69/V-1 9 ~,o.-~.-~ 6/1/92 12000'-12630' 2- 04/M-19 ~,~"-~'2- 6/18/92 10000'-10675' 2-52/S-144~?-'~'3''' 6/1 5/92 10600'-12667' 3-01/N-29o0{~-I?s 6/1/92 12150'-12844' 3-05/0-29 3/23/92 12000'-12520' 3-45/M-39 6/9/9 2 11800'- 12500' 4-06/Q-32 6/1 0/92 10000'-11534' 4-44/M-44 (6/22/92 13600'-14237' ~6/17/92 13900'-14316' , 6/2/92 13600'-14500' Compensated Neutron Log 2.5" CNL Leak Detection Survey Temperature Gamma Ray Log Gas Lift Survey Collar Log Injection Profile Survey TDT-P Jewelry Log Production Profile Survey Perforation Log Casing Collar Log Jewelry Log PFC/Gamma Ray '/'' Pump In Temperature Survey Temperature CCL Log / One One One One One One One One One One One One One One Schlumberger Camco Camco Camco Camco Schlumberger Camco Camco Halliburton Logging Services Atlas Wireline Services Camco Atlas Wireline Services Camco Camco Page 1 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 6, 1992 Lonnie Smith, Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: .Cancellation of Sundry Intents Dear Mr. Smith' The following is a list of approved Applications for Sundry Approvals for jobs that have been cancelled. If there is need for any additional information, please contact Jeanne Haas at 564-5225. 2-22/L- 14 90-773 10/9/90 1-43/P-26 90-896 12/24/90 3-39/J -39 91-082 3/14/91 .z;,2'~: 1-69N-19 91-333 11/6/91 Sincerely, ne Haas Technical Assistant II jlh CC: Working Interest Owners Drilling Well File RECEIVED MAR 11 ~992 ~iaska 0il & Gas Cons. ' ' ' Comnl[sslo~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 15, 1992 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sirs: Enclosed please find one sepia and one blueline print for the well logs run on the following Endicott wells' .~WE LL 1-69/V-19 / '~ 10/1/91 SU RF-11268' RUN ONE TEMPERATURE AUDIO PROFILE LOG HALLIBURTON LOGGING SVCS 11100'- 11260' LEAK DETECTION SURVEY CAMCO 3950'- 11400' LEAK DETECTION LOG CAMCO 11/23/91 RUN ONE WELL 2-14/O-16 10350'-11005' PRODUCTION PROFILE SURVEY CAMCO 11/27/91 RUN ONE 12/1/91 RUN ONE RECEIVED JAN 2 1 1992 Alaska 0il & Gas Cons. CommissJor) Anchorage 2370/JLH/clt BP EXPLORATION 1:3P Explora[~on ~Aia$~,a; 900 East Ben,son Boulevard Ancl~orage. Ata~a 996~-d6i2 (907) 561-5111 November 12, 1991 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sirs' Enclosed please find one sepia and one biueiine print for the well logs run on the following Endicott wells: Well 1-27/P-20 4/12/91 9800' - 10700' ~ Run One Perforating Record Halliburton Logging Services Well 1-69/V-19 --- .... 9/20/91 120' - 2020' Run One Temperature Survey Camco Well 2-06/J-22 12140' - 12205' Tubing Puncher Record Schlumberger 2-22/L-14 11284' - 11700' Perforating Record Schlumberger 10/26/91 Run One 9? 28/'91 Run One 2063/JLH/cit STATE OF ALASKA APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend __ Operation Shutdown __ Re-enter suspended well ~ Alter casing __ Repair well ~ Plugging ~ Time extension ~ Stimulate __ Change approved program ~ Pull tubing Vadance X Perforate __ Other __ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development ~ Exploratory __ Stratigraphic ~ Service x 4. Location of well at surface 2238' SNL, 2229' WEL, Sec. 36, T12N, R16E At top of productive interval 1483' SNL, 690' WEL, Sec. 02, T11N, R16E At effective depth 1763' SNL, 1115' WEL, Sec. 02, T11N, R16E At total depth 1801'SNL, 1170'WEL, Sec. 02, T11N, R16E 2. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12995' feet 10609' BKB feet 12899' feet 10534' BKB feet Plugs (measured) Junk (measured) 6. Datum elevation (DF or KB) KBE = 55.10 feet 7. Unit or Property name Duck Island Unit 8. Well number 1-69/1/- 19MPI 9. Permit number 90-29 10. APl number 50-029-22020 11. Field/Pool Endicott Oil Pool Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured de~/~ TrueBv/~ical depth 61' 30" Driven 100' 100' 2482' 13-3/8" 3604 c.f. Permafrost 2521' 2518' 11483' 9-5/8" 2560 c.f. Class G 11522' 9484' 1738' 7" 855 c.f. Class G 11240'- 12978' 9267'- 10595' measured 12282'- 12288', 12376'- 12404', 12452'- 12458', 12354'- 12372', 12434'- 12443' true vertical (subsea) 10011'- 10016', 10082'- 10103', 10139'- 10144', 10066'- 10079', 10126'- 10132' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 with 4-1/2" tailpipe to 11301' Packers and SSSV (type and measured depth) 9-5/8"packer at 11217'; 4-1/2" SSSV at 1554' 13. Attachments Description summary of proposal Detailed operations program 14. Estimated date for commencing operation 15. Status of well classification as: Remedial work to commence in the first week in December i4 0 V - 16. If proposal was verbally approved ~ Oil__ Gas ~ Suspended .'3 Name of approver ~..tt~$ ~S ~o.~ 'e/~o~! Alaska. Oil--~- Gas Gons. Date approved Service Water Injector 1'~. I hereby certify that the foregoing is true and c6rrect to the best of my knowledge. Signed '/)? z"~ /~[¢~ .~ Title Endicott Operations & Production Lead Engr. Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10- ~L~''~ Approval No~:~/.. ~, Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY LONNIE C ~"~ Commissioner Date SUBMIT IN TRIPLICATE REQUEST FOR VARIANCE Background Well 1-69N-19 is currently SI due to tubing/IA communication which was first indicated when 1-69N-19i was put on produced water injection (9/26/91) after approximately 6 weeks of being shut-in for lack of source water. A temperature/noise log run 10/1/91 indicates a leak across the seals in the seal bore receptacle (SBR). The tubing tested with a plug in the tailpipe which indicates that the leak rate from tubing to annulus is fairly Iow. However the IA will not pass a state integrity test. This may indicate that the chevron type seals in the "down" position have failed but that the "up" seals are still intact. Reserves et Risk Three wells are directly affected by V-19i: R-23, Q-26 and T-20. Well R-23 is two locations away and Q-26 is 3 locations away, but both wells are showing immediate effects due to their proximity to the 3C1 gas cap. Well R-23's GOR has gone from 2368 to 5251 in 3 months at a constant choke and a loss of 467 BOPD. In the same period, well Q-26's GOR has gone from 796 to 2076 at a constant choke setting and a loss of 700 BOPD. Both well's GORs continue to rise. Pro_Dosed Remedial Action8 Attempt to restore integrity by straddling the SBR with a new, reduced ID SBR. See the attached tool schematic, wellbore diagram and CCL. 1. Rig up E-line and pressure test. 2. RIH with pinned SBR assembly, including two retrievable packers. 3. Position upper packer in pup joint above SBR at 11204'MD and lower packer in seal bore receptacle at 11208'MD. Set both packers simultaneously with E-line pressure setting tool. 4. POOH with setting tool. 5. Rig up pump truck and pressure test. Pump ball down to shear-out nipple at end of tool. 6. Pressure test the tubing to 2000 psi for 30 minutes. 7. Pressure up to 2200 psi to shear pin that held SBR together and shear-out tailpipe. 8. Rig up and pressure test the inner annulus to 2000 psi for 30 minutes. 9. Return the well to injection. Reo_uest for Variance The SBR patch will not be ready to run until the first week in December. It is requested that this critical injection well be returned to service under a variance until remedial work can commence. The annulus will be monitored daily and pressures not allowed to exceed 2000 psi. V N0V - 4 ]991 Alaska Oil & 6as Cons. Cornmissio[~ Anchorage ~S0n Actuator I 'I~EE: 4.1/16" / 5000 psi / Cameron / Axelson Actuator R.T. ELEV -- 55.1' WELLHEAD: 13-5/8" / 5000 psi/FMC (CCL) B.F. ELEV = 16.72' , MAX. DEV. = 44:2 5300~ MD 13-3/8", 68#~t, NTB0 CYHE BUTT CSG - W/SSSV MIN. I.D. 2' 2521' ,. GLM's (O'I'IS), (1-1/2' RA Latch) No. TVDSS MD-BKR 9-5/8", 47#//t NT80S XO to NT95HS 9993' KOP: 2500' ' MAX ANGLE:,42° MD-BKB ~"~- --#1GLM (OTIS), (1-1/2: RA Latch) Ill 1176' 4-1/2', 12.6#/ft, L-80, TUBING TOP OF 7' LINER ~ X ~' TIW (4.00' I.D.) 11217' ~-- PARKER (3.813' I.D.) 11268' 9-5/8', 47#~1t, NT95HS, NSCC /,4. ! ] ~ 4-1/2" 'XN' NIPPLE PERFORATING SUMMARY Ref. Log: DLL-GR (3/26/90) SIZE SPF INTERVAL STATUS 3 3/8' 4 12282'-12288. OPEN ~ MARKER JOINT [12080' 3 3/8' 4 12434'-12443' OPEN RECEIVED NOV- 4 t9 9i Ai'aska Oil & Gas Cons. ComnlJ~  Anc,hora~e PBTD I 12899, Date By Comments ENDICOTT WELL: 1-69 / V-1 03~05~90 FH PROPOSED COMPLETION APl NO. 50-029-22020, 05/03/90 JLH COMPLETION COMPLETION DIAGRAM ;lOf~ TELEDYNE MERLA SBR PACKOFF ASSEMBLY Otis Internal Fishing Neck (3.75" OD x 2.62" ID) 4-1/2" Repeata-B (3.75" OD x 2.390" ID) Stinger with Seals (3.00" OD x 2.370" ID) Otis Internal Fishing Neck (3.75" OD x 2.62 ID) Seal Bore Receptical I I 4-1/2" Repeata-B (3.75" OD x 2.390" ID) RECEIVED OTIS 2.5" XN Nipple (2.313"ID) ~laska Oil & Gas Cons. Commissio~ Anchorage' Pump Out Plug PRH 10/27/91 I -.Fi:i~ · i, , t tt..- , ! ~ .... ~- · ~- , .......... ~ '51 , g ...... ~I ~ .... Iii , I i' .... ITl -"-~., ---~ ~  ..... I'ti .' -'- IT! f · ~ · ,,, '?100' GLM 11200 · · ! 11300 NOV_ ,l Alaska 0il & ~as Cons, Anchorage E Commission ,o/~o/S, 10900 11000 11100 11200 0000 ICCL -1000 200 TSPD 0 TD 5..00 DTMP TI'MI::' 5.00 180 10-01-91 20:41 10388.S Alaska Oil Gas Conservation Commission 300! Porcupine Drive Anchora§c. Alaska 995{il-3! 92 907-279-1433 Re: D/'" 0 Receipt of the following material which was transmitted via is hereby acknowledged: Ouantit~ Description I ¢, , ( ( RECF_IV£D Alaska Oil & Gas Cons. Commissiorl Copy sent to sender: Yes ~'/"No ~ June 13, 1991 Alaska Oil and Gas Conservation Commission Page 2 WELL 1-4 9/P-2,,,1 TEMPERATURE ~ 1 0770'-11272' WELL 1-69/V-19/ ~0~ TEMPERATURE SURVEY v 11200'-12885' WELL 2-02/P-18 70'-6756' ATLAS WIRELINE WELL 2-14/O-16 ~: PRODUCTION PROFILE SURVEY 7000'-10990' WELL 2-18/L-16 0t0 TEMP/CAP SURVEY v/ 11720'-11343' HRS WELL 2-20/L-15 ~0 TEMPERATURE COLLAR LOG ~/ 10100'-11550' WELL 2-26/N-14 STATIC TEMPERATURE SURVEYV 11 370'-1 2360' WELL 2-44/R-12 7 ~ R~Y tOG 10000'-12636' ATLAS WIRELINE 2013/JLH/clt 4/22/91 RUNONE 5/18/91 RUN ONE 5/3/91 RUN ONE 5/26/91 RUNONE 5/23/91 RUN ONE 5/25/91 RUNONE 5/16/91 RUNONE 4/24/91 RUNONE WI~LL 1-39/P-17 TDT-P 9690'-10610' SCHLUMBERGER WELL, 1-45/Q-26J PROD-F 12800'-13750' 3/5/91 RUNTHREE 1 2/1 9/90 RUN ONE WELL 1-69/V-19 ~ INJ 12000'-12887' / WELL 2-44/R-12v JEW ELRY LOG 10800'-11800' WELL 3-01/N-29 ~/' TDT-P 12100'-12941' SCHLUMBERGER 2/19/91 RUN ONE 2/18/91 RUN ONE 2/28/91 RUN FOUR WELL 3-05/O-29 2/23 / 91 T D T- P ~/ RUN FOUR 11550'-12380' SCHLUMBERGER WFL J 2/23/91 11550'- 1 2380' RUN FOUR SCHLUMBERGER WELL 3-25/M-27 LWD 9700'-10400' SCHLUMBERGER DLL 12890'-13536' 2/5-10/91 RUNONE 2/10/91 RUN ONE STATF OF ALASKA ALA,.,~A OIL AND GAS CONSERVATION COMMISSION ~' REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate__ Other x 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2238' SNL, 2229' WEL, Sec. 36, T12N, R16E 5. Type of Well: Development Exploratory Stratigraphic Service X 6. Datum elevation (DF or KB) KBE = 55.10 feet 7. Unit or Property name Duck Island Unit/Endicott 8. Well number 1-69/V- 19MPi At top of productive interval 1483' SNL, 690' WEL, Sec. 02, T12N, R16E At effective depth 1763'SNL, 1115'WEL, Sec. 02, T11N, R16E At total depth 1801'SNL, 1170'WEL, Sec. 02, T11N, R16E 9. Permit number/approval number 90-29/90-670 10. APl number 50- 029-22O20 11. Field/Pool Endicott Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12995' feet 10609' BKB feet 12899'feet 10534' BKB feet Plugs (measured) Junk (measured) Length Size Cemented Measured depth True ve~i~ depth BKB 61' 30" Driven 100' 100' 2482' 13-3/8" 3604 c.f. Permafrost 2521' 2518' 11483' 9-5/8" 2560 c.f. Class G 11522' 9484' 1738' 7" 855c. f. Class G 11240'- 12978' 9267'- 10595' measured 12282'- 12288', 12376'- 12404; 12452'- 12458; 12354'- 12372; 12434'- 12443' true vertical (subsea) 10011'- 10016', 10082'- 10103; 10139'- 10144; 10066'- 10079; 10126'- 10132' Tubing (size, grade, and measured depth) 4-1/2" 12.61/L-80 with 4-1/2" tailpipe to 11301' Packers and SSSV (type and measured depth) 9-5/8"packer at 11217'; 4-1/2" SSSV at 1554' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure JAN 1 19, ] Cmls. mmissi0 , 14. Prior to well operation Subsequent to operation Re0resentative Daily Averaoe Production or Injectign D~ta OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Converted from oil production service to water injection service on November 12. 1990 Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'//.,4,,,'~~ ~, ~ Title Reservoir DeveloDm~n, G~(~rdinator Form 10-4'04 Rev D6/15/88 Date /~- ~// SUBMIT IN DUPLICATI STATE OF ALASKA AD-,..,KA OIL AND GAS CONSERVATION COMMISS,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program__ Pull tubing __ Variance__ Perforate__ Other x 2. Name of Operator 5. Type of Well: 6. BP Exploration (Alaska) Inc. Development__ Exploratory __ 3. Address Stratigraphic__ 7. P. O. Box 196612, Anchorage, Alaska 99519-6612 Service x 4. Location of well at surface 8. 2238' SNL, 2229' WEL, Sec. 36, T12N, R16E At top of productive interval 9. Datum elevation (DF or KB) KBE = 55.10 feet Unit or Property name Duck Island Unit/Endicott Well number 1-69/V- 19 MPI Permit number 90-29 10. APl number 5O- O29-22O2O 1483' SNL, 690' WEL, Sec. 02, T12N, R16E At effective depth 1763' SNL, 1115' WEL, Sec. 02, T11N, R16E At total depth 1801'SNL, 1170' WEL, Sec. 02, T11N, R16E 11. Field/Pool Endicott 0il Pool 2. 1 Present well condition summary Total depth: measured true vertical Effective depth' measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: ' ' RECEIVED 12995' feet Plugs (measured) 10609' BKB feet AUG 2 ? 1990 12899' feet Junk (measured) 10534' BKB feet /[~aSka 0JJ & Gas Cons. 6omillJ$$J~ll Length Size Cemented Measured d~;~ gl3ChgB~verticalBKB depth 61' 30" Driven 100' 100' 2482' 13-3/8" 3604 c.f. Permafrost 2521' 2518' 11483' 9-5/8" 2560 c.f. Class G 11522' 9484' 1738' 7" 855 c.f. C/ass G 11240'- 12978' 9267'- 10595' measured 12282'- 12288', 12376'- 12404', 12452'- 12458', 12354'- 12372', 12434'- 12443' true vertical (subsea) 10011'- 10016', 10082'- 10103', 10139'- 10144', 10066'- 10079', 10126'- 10132' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 with 4-1/2" tailpipe to 11301' and measured ,4"p'h) ~.~/o.,, ,,~,.~.,,r o, ~ ~ o, 7,; 4-1/2" SSSV at 1554' 13. Attachments Description summary of proposal 14. Estimated date for commencing operation August 25, 1990 16. If proposal was verbally approved Name of approver Date approved Detailed operations program ~ BOP sketch 15. Status of well classification as: Oil Gas Service Water Injector Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/~,, ~__., /~-~~ Title Reservoir Development Coordinator FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity__ BOP Test__ Mechanical Integrity Test ~ /\ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required 10- SIGNED BY C,. J Approval No. ¢i/~ -~2 7t/~ /~pproveCl CoPY F~e~rned,., ~ SUBMIT IN TRIPLICATE BP EXPLORATION August 15, 1990 C.V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage Alaska 99519-6612 (907) 561-5'111 ...... .,'~-- ,~ · ' ;. · ,' , ' '" " RE: Notice of Commencement of Injection Operations for Well 1-69/V-19 Dear Mr. Chatterton' Endicott Well 1-69/V-19 will be converted from oil production service to water injection service the latter part of August, 1990 as part of the full field waterflood. Per field regulation 25.420, this letter fulfills the requirement of notification (not application). Arrangements will be made to have an AOGCC representative available for the pressure test of the casing immediately exterior to the injection tubing string as required by 25.412c and 25.412e. If there is a need for any additional information, please contact me at 564-4785. Sincerely, Herman L. Hellman Reservoir Development Coordinator HLH/~ilms WELL 1-69N-19 *PRODUCTION PROFILE 12080' - 12850' Camco 6/2/90 Run No. 1 WELL 2-04/M-19 6/16/90 *DUAL BURST TDT LOG (TDT-P) 9798'- 10682' Run No. 1 Schlumberger WELL 2-20/L-15 .. 6/29/90 *DGR/EWR/CNO/SFD 9491'- 10595' Run No. 1-3 Sperry-Sun *DGP,/EWR 10347' - 11635' Sperry-Sun Run No. 1-3 *DGR/CNO/SFD 10347' - 11635' Sperry-Sun Run No. 1-3 *FORMATION MULTI-TESTER 10704' - 11198' Run No. 1 Western Atlas " *GAMMA RAY (CASED HOLE) 10100'- 10520' Run No. 1 Western Atlas *CEMENT EVALUATION LOG 9515' - 11552' Run No. 1 Schlumberger *CEMENT BOND LOG 9515' - 11528' Schlumberger Run No. 1 *GAMMA RAY - POSTION GUNS 10276' - 10802' Run No. 1 Schlumberger WELL 2-22/L- 14 *INJECTION PROFILE 11080' - 12220' Camco 5/9/90 Run No. 1 7/2/9O 7/2/90 7/3/90 RECEIVED AI.J G -- 2 19~0 Alaska 0ii & Gas I;ons. bUllijJ%jSSjgil Aucho~age STATE OF ALASKA ALASK/~ OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LoG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] Water In. iectior~ 2. Name of Operator 7. Permit Number BP Exploration 90-29 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-661~___ 50- 029-22020 4. Location of well at surface J COMP~'-~ .......... :,,~ 9. Unit or Lease Name 2238'SNL, 2229'WEL, SEC. 36, T'2N, R16EIDATE,I~I ~i:'~'i~i' 'i~il/'i' 10.Duck/slandUnit/Endic°ttwell Number At Top Producing Interval !/ VERIFI~ i! 1-69/1/-19 MPI At Total Depth £ndicoff Field/Endicott Pool 1801'SNL, 1170'WEl_, SEC. 02, T11N, R16E 5. EleYation in foot {indie~tte KB, DF, etc.) ~. Lea~ Designation and Sedal No. KBE -- 55.10 I ADI. 34636 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore ]16. No. of Completions 03-03-90 03-26-90 05-18-90I 6-12'MSL feet MSL J ONE '1'~'. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 12995'MD/10609'TVD 12899'MD/10534'TVD YES [] NO []I 1554'feet MD I 1466'BKB 2~. Type 'Electric or Other Logs Run GR/DLL/MSFL, CNT/LDT/GR, RFT 23. CASING, LINER AND CEMENTING RECORD SEttING DEPTH MD CASING SIZE WT. PER FT. C.-.-.-.-.-.-.-.-.~ADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED .... 30" Struct. Drive Pipe Surface 100' 13-3/8" 68# NTSOCYHE Surface 2521' 17-1/2" 3604 cufl Permafrost ,, 9-5/8" 47# NT80S Surface 9993' 12-1/4" , 9-5/8" 47# NTgSHS 9993' 11522' 12-1/4" 2560 cu ft Class G 7" 29# NTgSHS 11240' 12978' 8-1/2" 855 CU ft C/ass G ,,, 24. Perforations open to Production (MD+TVD of TOP and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MDI PACKER SET (MDI Schlumberger 3-3/8" ~ 4 spf 4-1/2" 12.6# L-80 11301' 11216' MD TVDss 12282'-12288' 10011'-10016' .,6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12354'-12372' 10065'-10079' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12376'-12404' 10082'-10103' 13-3/8"x 9-5/8" Downsqueeze annulus with 145 12434'-12443' 10126'-10132 ...... 12452'-12458' 10139'- 10144' bbls dry crude 27. PRODUCTION TEST Date First Production JMethod of Operation (Flowing, gas lift, etc.) May 18, 1990 I Injecting water Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF ~ATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF ~VATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEiVEr) J U L - 5 1990 Alaska 0ii & Gas Cons. Form 10-407 Rev. 7-1-80 ~INUED ON REVERSE SIDE Submit in duplicate ,, 29. 30. GEOLOGIC MARKERS F .... ii'ION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top HRZ 11173' 9216' Itkiliyariak 11494' 9462' Top Kekiktuk 12120' 9943' r · 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~~'Z~~ Title EndicottLeadEn.qineer Date 7/~~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ~ Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Monday, March 5, 1990 WELL: 1-691V-19 UNIT RIG: DOYON #15 Day: 2 Depth at 0600 Hrs. = 2,535 48 Hour Footage = 2,535 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs - .. Current Operation: Cementing 13-3/8" casing. Summary of Last 72 Hours: Move rig to slot 1-69. Accept rig on Well 1-69/V-19 at 0500 hrs on 3/3/90. Spud well at 0800 hrs on 3/3/90. Drill and survey 17-1/2" hole to 2535'. POH. Run 13-3/8" casing. Wells Shut-in For Drill-By' Mud Type Spud Mud Mud Weiqht Viscosity p V. YP Fluid Loss Solids Temp 9.8 #/gal 80 Sec. 1 7 24 20.0 cc 10% °F Survey Depth. Angle Direction N-$ E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By' ,,,'~",,~Y:~ A, BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Tuesday, March 6, 1990 WELL: 1-69/V-19 UNIT RIG' DOYON #15 Day: 3 Depth at 0600 Hrs. = 2,603 24 Hour Footage = 68 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' Drilling. Summary of Last 24 Hours' Cement 13-3/8" casing. N/U split speedhead. RIH w/12-1/4" BHA. Test casing to 3000 psi- ok. Drill out cement. Trip for motor. Drill 12-1/4" hole to 2603'. Wells Shut-in For Drill-By: Mud Type Ligno Mud Weight Viscosity P V YP Fluid Loss Solids 9.3 #/gal 35 Sec. 7 6 22.0 cc 4% Temp oF Survey .Depth Angle Direction TVD N-S E-W Section. Coordinate Coordinate Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Wednesday, March 7, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 4 Depth at 0600 Hrs. = 3,939 24 Hour Footage = 1,336 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' RIH. Summary of Last 24 Hours' Drill 12-1/4" hole to 3939'. Trip for bit. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity P V LSND 9.3 Cf/gal 36 Sec. 5 YP Fluid Loss Solids 5 0.1 cc 4% Temp 57 OF Survey Deoth Angle Dire6tiQn TVD 12 3,278 25.20 S41W 3,253 15 3,870 -~' 40.80 S30W 3,751 N-S E-W Section Coordinate Coordinate 167 S88 W156 482 S353 W330 Dog Leg o/100' 3.60 2.90 Reviewed By:'~[/~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Thursday, March 8, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 5 Depth at 0600 Hrs. = 5,483 24 Hour Footage = 1,544 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' RIH. Summary of Last 24 Hours' Drill 12-1/4" hole to 5483'. Trip for washout. Wells Shut-in For.Drill-By: Mud Type LSND Mud Weight Viscosity P V. 9.4 Cf/gal 38 Sec. 8 YP. Fluid Loss Solids 8 5.0 cc 4% Temp OF Survey Depth Angle 1 9 4,539 43.50 23 5,300 44.20 Direction TVD. S30W 4,241 S32W 4,790 N-S E-W Section Coordinate Coordinate 932 S743 W563 1,455 S 1191 W838 Dog. Leg °t100, 0.30 0.10 Reviewed By' BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, March 9, 1990 WELL: 1-69/V-19 ENDICOTT UNIT RIG: DOYON #15 Day: 6 Depth at 0600 Hrs. = 7,030 24 Hour Footage = 1,547 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' Drilling. Summary of Last 24 Hours: Drill to 5617'. Trip for washout..Repair leaking standpipe. Drill ahead. Wells Shut-in For Drill-By: .Mud Type LSND Mud Weight Viscosity P V .YP Fluid Loss Solids Temp 9.7 #/gal 39 Sec. 8 9 8.2 cc 5% 60 °F Survey Depth Angle 27 6,137 43.10 30 6,717 41.70 N-S E-W Dog Leg Direction , TVD Sectioli COordinate Coordinate °/100! S31W 5,394 2,030 S1686 W1144 0.30 S29W 5,822 2,417 S2024 W1342 0.30 Reviewed By' h/'/~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Monday, March 12, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day' 9 Depth at 0600 Hrs. = 8,850 72 Hour Footage = 1,820 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Drilling. Summary of Last 72 Hours: Drill & survey 12-1/4" hole to 8850'. Wells Shut-in For Drill-By' Mud Type FW/LIG Mud Weight Viscosity P V 9.7 #/gal 35 Sec. 9 YP FIui¢ Loss Solids 5 6.5 cc 8% Temp 82 OF Survey Depth Angle 35 7,554 41.80 39 8,311 40.10 41 8,703 38.60 Direction TVD. S39W 6,454 S42W 7,O24 S42W 7,327 N-S E-W Section Coordinate Coordinate 2,960 S2491 W1628 3,458 S2860 W1963 3,706 S3045 W2129 Dog Leg o/100' 3.00 0.50 0.40 Reviewed By: /~,~:)~. BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Tuesday, March 13, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 0 Depth at 0600 Hrs. = 9,616 24 Hour Footage = 766 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Testing BOPE. Summary of Last 24 Hours: Drill 12-1/4" hole to 9616'. POH for bit change. Wells Shut-in For Drill-By: .Mud Type Mud Weight .Viscosity .P V FW/LIG 10.0 #/gal 40 Sec. 1 2 YP Fluid Loss Solids 9 5.7 cc 8% Temp oF Survey Depth Angle Direction TVD 45 9,538 38.80 S45W 7,978 N-S E-W Section Coordinate Coordinate 4,228 S3434 W2478 Dog Leg °/100'' 0.10 Reviewed By: ,~~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Wednesday, March 14, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 11 Depth at 0600 Hrs. = 10,065 24 Hour Footage = 449 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Drilling. Summary of Last 24 Hours: RIH with new bit. Drill 12-1/4" hole to 10065'. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity P V FW/LIG 9.9 Cf/gal 38 Sec. 1 0 .Y.R Fluid Loss Solids 8 5.7 cc 8% Temp 75 OF Survey Depth Angle Direction TVD 47 9,911 40.20 S46W 8,266 N-S E-W Section Coordinate Coordinate 4,464 S3600 W2648 Dog Leg 01100' 0.30 Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Thursday, March 15, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 2 Depth at 0600 Hrs. = 10,255 24 Hour Footage = 1 90 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Drilling with motor. Summary of Last 24 Hours: Drill 12-1/4" hole to 10219'. Trip for motor. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity P V Ligno 1 0.2 #/gal 39 Sec. 1 3 YP. Fluid Loss Solids 13 5.8 cc 11% Temp 84 OF Survey Deoth Angle Direction TVD 48 10,108 41.70 S50W 8,414 N-S E-W Section Coordinate Coordinate 4,588 S3690 W2734 Dog Leg o/100' 1.50 Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Friday', March 16, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day' 1 3 Depth at 0600 Hrs. = 10,431 24 Hour Footage = 176 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' RIH. Summary of Last 24 Hours' Drill 12-1/4" hole with motor to 10431'. Trip for BHA. Wells Shut-in For Drill-By' Mud Type Mud Weight Viscosity p V. YP Fluid Loss Solids Ligno 1 0.1 Cf/gal 56 Sec. 1 2 8 5.4 cc Temp N-S E-W Survey Depth Angle Direction TVD Section Coordinate Coordinate 50 10,353 41.20 S44W 8,600 4,746 S2798 W2853 Dog Leg ?/100' 3.10 Reviewed By: 344 (/~I.. BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Monday, March 19, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 6 Depth at 0600 Hrs. = 11,537 72 Hour Footage = 1,106 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Cementing 9-5/8" casing. Summary of Last 72 Hours: Drill to 10,813'. POH for washout. Drill to 11,537' (T.D. 12-1/4" hole). CBU. POH. Run 9-5/8" casing. Circulate and condition for cementing. Wells Shut-in For Drill-By: MudType Mud weight Viscosity P v YP. Fluid Lg$~. Solids ,Temp. ligno 10.4 Cf/gal 38 Sec. 1 4 11 5.4 cc 13% 88 °F N-S E-W Dog Leg Survey Depth Angle Direction TVD Section Coordinate Coordinate °/100' 52 10,611 41.70 S44W 8,837 4,957 S3953 W2998 0.70 57 11,537 39.20 S54W 9,493 5,514 S4329 W3418 0.40 BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Tuesday, March 20, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 7 Depth at 0600 Hrs. = 11,537 24 Hour Footage = 0 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: RIH to drill out casing. Summary of Last 24 Hours: Cemented 9-5/8" casing with 1260 sx lead cement and 155 sx tail cement. Installed packoff. Tested BOP. PU 8-1/2" BHA. RIH. (Shoe - 11,522'). Wells Shut-in For Drill-By: MudType Mud Weight Viscosity P V YP Fluid Loss Solids Temp ligno 9.7 Cf/gal 38 Sec. 8 8 6.8 cc 8% °F Survey Depth Angle Direction N-$ E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Wednesday, March 21, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 8 Depth at 0600 Hrs. = 11,770 24 Hour Footage = 233 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Drilling Summary of Last 24 Hours: RIH. Test casing. Drill shoe. Fit- 13.8 ppg EMW. Drill 8-1/2" hole. Wells Shut-in For Drill-By: Mud Type ligno Mud Weight Viscosity P V yP, Fluid Loss Solids Temp 9.7 Cf/gal 36 Sec. 1 0 7 6.9 cc 7% 96 °F Survey Depth Angle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By :~~----'-' BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Thursday, March 22, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 1 9 Depth at 0600 Hrs. = 11,890 24 Hour Footage = 120 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' Drilling. Summary of Last 24 Hours' Drill to 11808'. Trip for bit. Drill ahead. Wells Shut-in For Drill-By: MudType Mud Weight .Viscosity P V FW/LIG 9.8 #/gal 40 Sec. 9 YP Fluid Loss Solids Temp 8 7.4 cc 8% 96 °F Survey Depth Angle Diredti0n TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By' F.\-~, BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Friday, March 23, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 20 Depth at 0600 Hrs. = 12,160 24 Hour Footage = 270 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' Drilling. Summary of Last 24 Hours: Drill 8-1/2" hole to 12,160'. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity FW/Ligno 9.8 Cf/gal 37 Sec. PV YP Fluid Loss Solids ~ 9 8 7.6 cc 8% 98 °F Survey Depth Angle Direction N-S E-W. Dog Leg .TVD Section Coordinate Coordinate °/100' Reviewed By: ~ ~,, ~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Monday, March 26, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 23 Depth at 0600 Hrs. = 13,005 72 Hour Footage = 845 APl No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: POH for logs. Summary of Last 72 Hours: Drill 8-1/2" hole to TD at 13,005'. Circulate and condition hole for logs. Wells Shut-in For Drill-By: MudType Mud Weight Viscosity P V YP Fluid Loss Solids Temp FW/ligno 9.8 #/gal 39 Sec. 9 11 6.6 cc 8% 105 °F N-S E-W ..Dog Leg Survey Depth Angle Direction TVD Section Coordin~,te Coordina, te °/100' Reviewed By:,¢~"/4¢~-~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Tuesday, March 27, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 24 Depth at 0600 Hrs. = 24 Hour Footage = 0 12,995 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: POH to finish logs. Summary of Last 24 Hours: POH for logs. Run open hole logs: Run #1 GR/DLL/MSFL, Run #2 CNT/LDT/GR. Make wiper trip to condition hole. Circulate and raise mud weight to 9.9 ppg. Wells Shut-in For Drill-By: Mud Type Mud Weiqht Viscosity P V YP Fluid Loss Solids Temp FW/LIG 9.9 #/gal 38 Sec. 8 8 6.9 cc 9% 102 °F N-$ E-W Doa Lea Survey Depth Angle. Direction TVD Section Coordinate Coordinate °/100' Reviewed By: '/~¢x¢ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Wednesday, March 28, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 25 Depth at 0600 Hrs. = 12,995 24 Hour Footage = 0 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = .. Current Operation: Running 7" liner. Summary of Last 24 Hours: Logging: Run #3 RFT. Make wiper trip to condition hole for liner. Wells Shut-in For Drill-By: Mud Type Mud Weight Viscosity .P V .Y? Fluid Loss Solids Temp FW/LIG 9.9 #/gal 37 Sec. 8 7 7.0 cc 9% °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By'/~-"'.~,~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Thursday, March 29, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 26 Depth at 0600 Hrs. = 12,995 24 Hour Footage = 0 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation: Cleaning cement out of 9-5/8" casing. Summary of Last 24 Hours: Run and cement 7" liner; shoe at 12977'. clean cement out of 9-5/8" casing. RIH with bit and scraper to Wells Shut-in For Drill-By: Mud Type Mud Weiqht Viscosity. P V Ligno 9.9 Cf/gal 36 Sec. 8 YP Fluid Loss Solids Temp 7 7.2 cc 9% 102 °F Survey Depth Angle Direction .N-$ .E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: ENDICOTT As of 0600 Hrs. Friday, March 30, 1990 WELL: 1-69/V-19 UNIT RIG: DOYON #15 Day: 27 Depth at 060© Hrs. = 12,899' PBTD 24 Hour Footage = 0 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs = Current Operation' Filter brine. Summary of Last 24 Hours' Clean cement out of 7" liner. Test liner and lap to 3000 psi, ok. Displace well to 9.9 ppg brine. Wells Shut-in For Drill-By' MudType Mud Weight Viscosity P V YP Fluid Loss Solids Brine 9.9 #/gal Sec. cc Temp oF Survey Depth Angle Direction TVD N-S E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By'/,~,~ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, April 2, 1990 WELL: 1-69/V-19 ENDICOTT UNIT RIG: DOYON #15 Day: 29 Depth at 0600 Hrs. = 12,899' PBTD 72 Hour Footage = 0 AP! No. 50-029-22020 AFE Number: 717579 AFE Amount = Current Field Costs -- Current Operation' Rig released. Summary of Last 72 Hours: Filter brine. Test liner and lap to 3000 psi, ok. POH. Run CET/CBT and Gyro. Run 4-1/2" completion string. N/U tree and test to 5000 psi, ok. Displace well to diesel. Set packer and test completion. Release rig at 2100 hrs on 3/31/90. Wells Shut-in For Drill-By: Mud Tv.De Brine Mud Weight Viscosity PV YP ~ Solids 9.9 #/gal Sec. cc °F Survey D_.Ep..tb Angle D. JL.e..62L¢~ TVD N-$ E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed OIIIGINAL $ UB.S URFA CE DIRECTIONAL SURVEY ~UIDANCE r~ONTINUOUS ~-~']OOL IC OFILME, D Company BP E,X, PLORAT I ON Well Name 1-69/V-19 MPI(2238' SNL~2229' WEL,SEC 36,T12N,R16E) FieldlLocation.ENDICOTT~ NORTH SLOPE~ ALASKA Job Reference No. t~ ~ ~.~'~;~ ~ '~ Date 7 3794 ~. -~i ~. ~,~,~ ,~ .~.~ 30-MAR-90 LO~ By: ~ ~ ~ SALAZAR ~,, ~(~s ~ ~ KOHRING GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION 1-69/V-19 END]:COTT NORTH SLOPEr ALASKA SURVEY DATE: 30-MAR-90 ENGINEER: SALAZAR METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZo OISTo PROJECTED ONTO A TARGET AZIMUTH OF SOUTH ~0 DEG 50 MIN WEST! CONPUTATION DATE: 17-APR-90 PAGE BP EXPLC)RATZON 1-69/V--19 HPI ENDICOTT NORTH SLOPE· ALASKA TRUE SUB-SEA COURSE lqEASURED VERTICAL VERT:rCAL DEVI'ATION AZIIqUTH DEPTH DEPTH DEPTH DEG NIN DEG 0.00 0.00 -55010 0 0 N 0 0 E 100000 100.00 44090 0 7 S 33 21 111 200000 200.00 144.90' 0 5 S 89 17 111 300.00 300.00 244.90 0 3 S 34 29 111 400.00 400000 344090 0 I S 13 44 111 500.00 500,00 444.90 0 2 N 86 54 E 600.00 600.00 544.90 0 9 N 83 34 E 700.00 700.00 644.90 0 15 S 82 0 E 800.00 800.00 744090 0 10 S 76 46 E 900.00 900.00 844.90 0 17 S 87 59 E 1000000 1000.00 944.90 1100.00 1100.00 1044.90 1200.00 1199.99 1144089 1300.00 1299.99 1244.89 1400.00 1399.98 1344.88 1500000 1499.97 1444087 1600.00 1599.95 1544.85 1700.00 1699.79 1644.69 1800.00 1799.58 1744048 1900000 1899.36 1844.26 DATE OF SURVEY: 30-NAR-90 KELLY BUSHING ELEVATION: 55-10 FT ENGINEER: SALAZAR' INTERPOLATED VALUES FOR EVEN: 100 FEET OF HEASURED DEPTH VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTU~E SECTION SEVERITY NORTH/SOUTH EAST/HEST DZST* AZIMUTH FEET OEG/IO0 FEET FEET FEET' OEG MIN 2000.00 1999.16 1944.06 2100000 2098.98 2043.88 2200.00 2198.82 2143.72 2300000 2298.69 2243.59 2400.00 2398.57 2343.47 2500000 2498.45 2443.35 2600.00 2598030 2543.20 2700.00 2697.93 2642.83 0 14 S 70 6 E 0 18 S 86 13 E 0 16 S 76 34 E 0 37 S 8426 E 112 N 85 I E 0 13 S 26 59 E 2 13 # 83 25 Id 3 40 N 62 48 111 3 46 N 60 49 111 3 4? N 61 52 111 Z800.O0 2797.00 2741.90 9 13 2900.00 2895.31 2840.21 12 9 3 30 # 61 54 Id 3 23 N 62 24 Id 2 59 N 64 25 Id 2 48 N 64 59 # 2 49 N 65 26 Id 2 55 N 69 4111 3 35 S 87 15 # 6 I S 59 lid S 47 55 Id S 41 32 ~1 0o00 0.00 0.00 N 0.00 E 0.11 0.00 0.15 S 0.00 Id 0.17 0.58 0.24 S 0.03 E 0.18 0.31 0.29 S 0.06 E 0.17 0.10 0.31 $ 0.10 E 0.12 0.00 0.32 S 0.19 E 0.03 0.16 0.36 S 0.37 E -0.15 0.27 0.37 $ 0.66 E -0.40 0.23 0.39 $ 1.06 E -0.62 0.05 0.47 S 1.49 E 3000.00 ~:992 38 2937028 15 29 3100.00 3088:00 3032.90 18 29 3200.00 3181.76 3126.66 22 17 3300~-00 3273.08 3217.98 25 28 3400~0 3362.56 3307.46 27 36 3500~00 ~.~.98 3394.88 30 20 360 Og;O0~ 64 3480.54 31 51 3 7 O0-;;:O 0,= ' 38~-~= 36~ 87 3644.77 37 52 ~ ~ 1 ~.19 3722.09 40 45 C- (.0 -0.83 0.16 0.53 S 1.88 E -1.10 0.22 0.62 S 2.39 E -1.36 0.00 0.67 S 2.85 E -1.69 0.39 0.81 S 3.53 E -2.77 0.34 0.8,4 S 5-21 E -3.72 1.43 0.80 S 6.62 E -2,69 3.13 1.10 S 5.38 E -0.94 0.27 0098 N 0.29 E 0.46 0.00 4.09 N 5.43 Id 1.84 O.1Z 7.28 N 11.24 Id 3.26 0.39 . 10.24 N 16.83 4.54 0.24 13.13 N 22.13 Id 5.95 0.22 15.62 N 27.17 111 7.31 0.03 17.75 N 31.T2 8.65 0.25 19.80 N 36.13 Id 10.17 0.51 21-80 N 40.77 13.07 2096 22.49 N 46.01 id 20.43 2.72 19.59 N 53.91 Id 33.65 2.47 11.25 N 64046 M 51.87 4.03 1.87 S 77.16 Id S 43 47 Id 75.81 3.29 S 41 59 111 105.00 3.50 S 40 51 Id 139.72 4.18 S 39 45 Id 180.41 2.34 S 37 16 Id 224.99 2.66 S 34 5 111 273.33 2.81 S 30 4 id 324.26 2.29 S 29 52 Id 378.04 3.28 S 30 18 bi 436.18 2.79 S 30 45 Id 498.56 2.68 0.00 N 0 0 E 0.15 S 0 44 U 0.25 S 6 10 E 0.30 S 10 50 E 0.33 S 18 27 E 0.37 S 30 55 E 0.51 S 45 24 E 0.76 S 60 33 E ) 1.13 S 69 52 E 1.56 S 72 26 E 1.95 S 74 14 E 2.47 S 75 31 E 2.93 S 76 46 E 3.62 S 77 Z E 5.28 S 80 52 E 6.66 S 83 : 7 E 5'49 S 78 27 E 1.03 N 16:33 E 6.80 N 53 I Id 13.39 N 57 5 M 19.70 N 58 41 If/ 25.73 N 59 19 Id 31.34 N 60' 7 bt 36.35 N 60 46 g 41.20 N 61 17 Id 46.23 N 61 52 Id 51.21 N 63 57 Id 57036 N 70 I ¥ 65.44 N 80 6 Id 77.18 S 88 37 ~1 19.54 S 93.33 Id 95.35 S 78 10 Id 40.76 S 113.41 Id 120.51 S 70 14 Id 66.90 S 136.25 Id 151.79 S 63 51 H 97091 S 162.62 ~ 189.82 S 58 57 M 132.90 S 190.30 ~ 232.11 S 55 4 Id 172.25 S 218.70 ~ 278.39 S 51 47 ~ 216.06 S 245.90 Id 327.33 S 48 42 M 263.59 S 273.16 g 379.59 S 46 I Id 314.81 S 302.81 Id 436.80 S 43 53 Id 369.41 S 335.02 W 498.70 S 42 12 Id BP EXPLORATION 1-69/V-19 #p! ENDICOTT NORTH SLOPEr ALASKA COMPUTATION DATE: 17-APR-90 PAGE DATE OF SURVEY: 30-MAR-90 KELLY BUSHING ELEVATION: 55010 FT~ ENGINEER: SALAZAR - INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVZAT!DN AZZNUTH' SECTION SEVERITY NORTH/SOUTH EAST/HEST DIST. AZINUTH DEPTH DEPTH DEPTH DEG #IN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 4.00000038510773796.674238 4'100.003924.953869.8543: 4200-003997.883942.78431 4300-004070.78'40,5.684315 4400.00 4143.94 4088.84 4q 4500-004216.784161.68' :3~ 32 4600-004289.324234.22 24 4700-004.361.904306.8043.31 4800-004434.304379.20.4351 4900-004506.1544.51.05444 5000.00 4578.16 4523006 43 54 5100.00 4650.18 4595.08 43 58 5200.00 4722.05 4666095 44 8 5300.00 4793067 4738.57 44 20 54.00.00 4865.24 4810.14 44 13 5500.00 4937.00 4881.90 44 15 5600.00 5008.75 4953.65 44 1 5700.00 5080.65 5025.55 44 0 5800000 5152.71 5097.61 43 47 5900000 5225.10 5170.00 43 28 6000.00 5297.82 5242.72 43 13 6100000 5370057 5315047 4.3 25 6200000 54.43.4.4 5388.34 43 5 6300.00 5516.61 5461.51 42 51 6400°00 5590.05 5534.95 42 41 6500.00 5663.73 5608063 42 27 6600.00 5737.75 5682.65 42 4 6700.00 5812.24 5757014 41 44 6800.00 5886.80 5831.70 41 36 6900000 5962.04. 5906.94 4.1 0 7000.00 6037.59 5982.4.9 4.0 52 7100.00 6113.39 6058.29 40 39 7200.00 6189.21 6134011 4.0 44 7300.00 6264.96 6209.86 40 50 74.00.00 6340.39 6285.29 41 7 7500.00 6415.75 6360065 41 15 7600.00 6490.64 6435.54 41 38 7700.00 6565.32 6510.22 4.1 41 7800.00 664.0.22 6585.12 41 26 7900.00 6715013 6660.03 4.1 29 S 31 0 W 564.17 S 31 11 # 631.33 S 31 9 g 698.78 S 31 2 W 766.24 $ 31 T M 833.42 S 31 9 bi 900.96 S 31 14 W 968.82 S 31 18 bi 1036.64. S 31 19 W 1104.68 S 31 23 W 1173.27 S 31 30 W 1241.73 S 31 37 W 1310.19 S 31 44 if 1378'84 S 31 51 # 1447.76  31 44. W 1516.73 31 29 W 1585.47 $ 31 29 W 1654.19 S 31 48 bi 1722.79 S 31 48 ¥ 1791027 S 31 55 bi 1859.42 S 31 39 W 1927.21 S 31 32 W 1994.92 S 31 31 W 2062050 S 31 8 W 2129.74 S 30 37 W 2196.58 S 30 17 W 2263.08 S 30 1 W 2329.15 S 29 55 W 2394066 S 30 5 W 2460.10 S 30 10 W 2524..83 S 30 15 W 2589.22 S 30 23 W 2653.33 S 30 50 W 2717.50 S 31 32 bi 2781.84 S 33 8 W 2846.74 S 36 13 W 2912.07 S 40 I ¥ 2978.25 S 41 55 W 3044.75 S 42 9 W 3110.99 S 42 15 W 3177.22 1.09 0.15 0.08 0.62 0.45 0.80 0.10 0.07 0.66 1.14 0.31 0.29 0.34 0.22 0.71 0.33 0.28 0.37 0o31 0.49 0.50 0 °32 0.71 0.52 0.29 0.70 1.21 0.13 0.24 0.36 0.30 0.75 2.01 2.96 2.56 0.65 0.63 0.59 s , s ss ,, 660-4.7 S 510.36 V 834-68 S 37~ W 719.13 S 545.78 W 902.79 S 37 12 W 778,.01 S 581.42 W 971.27 S 36 46 ¥ 8 .8o s , s z, 895.75 S 652.97 ~ 1108.~8 S 36 5 M 955.15 S 689.1~ ~ 1177-81 S 35 ~9 M 101~.3~ S 725'35 M 12~7-01 S 35 3~ ~ 1073.&7 S 761.63 M 1316.22 S 35 Z] ~ 1132.66 S 798.1~ M 1385.62 S 35 10 ~ ~191.97 S 83~.91 M 1~55.29 S 35 I ~ 125~.33 S' 871.71 M 1525.02 S 3~ 52 ~ 1310.65 S 908.20 M 159~.5& S 3~ ~3 ~ 1370.09 S 9~.51 ~ 166~.11 S 3~ 35 M la29.26 S 980.97 M 1733.52 S 3~ 28 ~ 1~88.18 S 1017'52 M 1802-78 S 3~:22 ~ 15~&.77 S 1053.95 ~ 1871.71 S 3~ 16 ~ 16.05.11 S 1090.12 M 19~0.29 S 3~ 11 M 1663.57 S 1126.02 M 2008.83 S 3~: 6 ~ 1721.9~ S 1161.85 M :2077.25 S 3~ I ~ 1780.16 S 1197.31 M 2145.35 S 33 55 M 1838.~2 S 1232.12 ~ 2213.12 S 33 50 M 1896.72 S 1266.36 N 2280.62 S 33 ~ ~ 195~.87 S 1300.12 M 23~7.73 S 33 38 ~ 2012.68 S 1333.~1 M 2~1~.31 S 33 31 ¥ 2070.~1 S 1366.70 ~ Z~80.82 S 33 26 M 2127.~0 S 1399.75 ~ 25~6.59 S 33 21 N 218&.01 S 1~32.73 M 2612.01 S 33 16 M 22~0.33 S 1~65.61 M 2677.1~ S 33 12 M 2296.~5 S 1~98.81 M 27~2.28 S 33 8 ~ 2352.33 S 1532.55 M 2807.52 S 33 5 N 2~07.92 S 1567.50 M 2873.17 S 33 ~ N 2~62.05 S 160~.76 M 2938.87 S 33 6 M 251~.1~ S 16~5.70 M 300&.87 S 33 12 ~ 256~.15 S 1689.5& ~ 3070.73 S 33 23 M 2613.37 S 1733.89 ~ 3136.25 S 33 3' ~ 2662.~ S 1778.~0 M 3201.76 S 33 ~a M CONPUTATXON DATE: 17-APR-90 PAGE' ' _ BP EXPLORATZON 1-69/V-19 HP:I DATE OF SURVEY: 30-#AR-90 ENDZCOTT KELLY BUSHZNG ELEVATZO.N: 55.10 FT NORTH SLOPEr ALASKA ENGZNEER: SALAZAR · ZNTERPOLATEO VALUES FOR EVEN 100 FEET: OF REASUREO DEPTH TRUE SUB-SEA COURSE VERTZCAL DOGLEG RECTANGULAR COORDZNATES HORZZo OEPARTURE MEASUREO VERTZCAL VERTXCAL DEVXATZON AZZNUTH SECTZON SEVERZTy NORTH/SOUTH EAST/WEST OXST. AZZHUTH OEPTH OEPTH OEPTH DEG #~N OEG NZN FEET DEG/ZO0 FEET FEET FEET OEG MZN 8000.00 6790.16 6735004 41 17 8100.00 6865.68 6810.38 60 56 8200.00 6941.27 6886017 60 35 8300.00 7017.45 6962.35 40 13 8400.00 7094.17 7039~07 39 38 8500.00 7171o32 7116.22 1'39 22 8600.00 7248°95 7193.85 38 55 8700.00 7326.91 7271.81 38 36 8800.00 7405.34 7350026 38 5 8900.00 7484.08 7428.98 38 9 9000000 7562.55 7507.45 38 29 9100000 7640.75 7585.65 38 61 9200000 7718.71 7663061 38 53 9300.00 7796.51 7741.41 38 57 9400000 7876.20 7819.10 39 2 9500.00 7951.96 7896.86 38 56 9600.00 8029.72 7974062 39 9700000 : 8107013 8052003 39 33 9800000 8186.06 8128096 39 52 · 9900.00 8260.67 8205057 40 6 10000.00 8337.02 8281092 40 22 10100.00 8412.89 8357.79 40 57 10200.00 8688.13 8433.03 41 24 10300000 8563.43 8508.33 40 55 10600.00 8638.63 8583.53 41 33 10500.00 8713.10 8658000 42 7 10600.00 8787.30 8732.20 41 57 10700000 8861.83 8806.73 61 41 10800000 8936.62 8881.52 41 35 10900.00 9011.46 8956036 61 33 11000.00 9086.44 9031.34 41 12 ~11100.00 9161.84 9106.74 60 55 11200000 9237.75 9182065 40 28 11300000 9313.81 9258071 60 11 11400000 9390.49 9335039 39 49 11500000 9667076 9412.66 39 12 11600.00 9564.91 9489.81 39 53 11700000 9621.79 9566069 39 40 11800000 9698.58 9643048 39 47 11900.00 9775.40 9720.30 39 51 S 62 26 M 3263.33 S 42 17 g 3309.05 S 42 7 g 3374.28 S 41 54 g 3639.05 S 41 56 ¥ 3503.18 S 42 16 ~ 3566.78 S 62 4 M 3629.81 S 41 66 ~ 3692.42 S 41 24 ~ 3754.45 S 61 27 ~ 3816.09 S 41 33 M 3878.07 S 61 37 M 3960.40 S 61 57 g 4003002 S 42 36 M 6065.83 S 43 23 # 4128.74 S 66 19 # 6191.54 $ 45 7 g 4254026 S 45 31 ¥ 4317.38 S 46 0 M 4381.05 S 66 56 ~ 4445.00 S 48 5 ¥ 4509.15 S 49 13 # 4573.69 S SO 6 , 4638.77 37 ~ 4769.65 S 42 57 M 4836.34 S 43 13 ~ 4903.33 S 43 37 M 4969.93 S 44 12 g 5036.22 S 64 49 W 5102.41 S 45 40 M 5168.39 S 66 51 M 5233.78 S 48 21 M 5298.46 S 50 47 M 5362.62 S 52 30 ~ 5425.67 S 54 49 ~ 5487.55 S 56 21 ¥ 5549.02 S 56 18 M 5610.67 S 57 0 M 5672.34 S 57 52 # 5733.69 0.26 0.42 0.29 0.18 0.66 0.74 0.22 0.43 0.18 0.75 0.17 0.30 0.41 0.47 0.59 0.59 0.52 0.62 Z711.33 S 1822.93 W 3267.17 S 33 55 2759.92 S 1867.23 ~ 3332022 S 34 5 2808.26 S 1911.04 W 3396.82 S 34 14 2856.40 S 1954.39 M 3461.02 S 34 23 2904.17 S 1997.20 d 3524.63 S 34 31 2951.37 S 2039.85 W 3587.70 S 34 39 2998.11 S 2082.15 ~ 3650.21 S 34 47 3044.72 S 2123.99 ~ 3712.36 S 34 54 3091.12 S 2165.15 ~ 3773098 S 35 1 3137.39 S 2205.89 ~ 3835.25 S 35 7 3183077 S 2247.01 ~ 3896.85 S 35 13 M 3230040 S 2288.37 g 3958.80 S 35 19 N 3277.13 S 2330.07 M 4021.04 S 35 25 ~ 3323.64 S 2372.32 ~ 4083.43 S 35 31 ~ 3369.70 S 2415.23 M 6165.86 S 35 38 W 3415.06 S 2658.77 M 4208.11. S 35~45 ~ 3459.73 S 2503.01 g 4270.22 S 35 53 M 3504.24 S 2548.03 ~ 4332069 S 36 I M 0.49 3548.85 S 2593.80 M 4395.69 S 36 10 0076' 3593.15 S 2640.33 ~ 4458.93 S 36' 19 0.88 0.96 0.74 2.69 1.92 0.60 0.34 0.60 0.26 0.77 0 .T6 0.88 1.62 1.97 2.32 1.26 0.63 0.84 0.83 0.66 3636080 S 2687.93 M 4522.31 S 36 28 W 3679084 S 2736.83 M 4586001 S 36 38 g 3722040 S 2787.10 g 4650019 S 36 49 g 3765.81 S ~836.53 ~ 6714 58 S 36 59 M 3812.34 S 883.21 ~ 4779:84 S 37 6 M 3861.12 S 2928.75 ~ 4846.22 S 37 11 g 3910.05 S 2974.58 ~ 4912090 'S 37 16 ~ 3958053 S 3020.34 M 4979.20 S 37 21 M ~ 4006.33 S 3066.41 ~ 5045.15 S 37 26 M ~ 4053.69 S 3112.84 M 5110.98 S 37 31 W 4100.28 S 3159.83 M 5176.57 S 37 37 4145.72 S 320~.26 ~ 5241.52 S 37 44 4189.67 S 3255.28 ~ 5305.68 S 37 51 M 4231088 S 3304.60 ~ 5369.28 S 37 59 4271.71 S 3354.92 g 5431.67 S 38 9 4309.31 S 3406.06 ~ 5492.85 S 38 19 6365010 S 3458.65 M 5553.57 S 38 31 4380.62 S 3511.84 ~ 5614.52 S 38 43 4415.93 S 3565.29 ~ 5675.54 S 38 55 4450.39 S 3619.2~ ~ 5736o28 S 39 7 COHPUTATZON DATE: 17-APR-90 ~* PAGE BP EXPLORATION 1-69/V-19 HP! ENDZCOTT NORTH SLOPE. ALASKA DATE OF SURVEY: 30-MAR-g0 KELLY BUSHING ELEVATION: 55.10 FT ENGINEER: SALAZAR · INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVZATION AZIMUTH DEPTH DEPTH DEPTH DEG gin DEG MZN VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/MEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 11000.00 9852.28 9797.08 3~ ~3 11100.00 9929.10~.-.'~8~74;00'~ 3~ ~9 tzzoo.oo 1oo05.~5 ~5o.35; 40 ~3 12300.00 20080.86 20025.76~ 41 8 1Z400.00 10156.15 10101o_0_5~n_ 41 11 12500.00 10231.36 10176'zo~: 41 20 ~2600.00 ~0~0~.2~ ~0253'rr 42 ~ ~2~00.00 ~0~8~.~ ~0326.45 ~0 34 ~2~00.00 20~8.~ ~0403.07 3~ ~ ~2~00.00 ~05~.~ ~0~80.28 3~ 27 S 58 33 Id 5794.83 S 58 39 W 5855.66 S 58 14 Id 5917.22 S 57 44 ~ 5980.00 S 57 Z M 6043.06 S 56 30 bi 6106.47 S 56 45 ~ 6170.23 S 56 34 bi 6233.55 S 55 4 Id 6295.59 S 5~ 41 ~ 6357.36 0.56 lo02 1.55 0.36 0.82 0.52 0.46 1.68 1.41 0.00 4484.12 S 3673.71 bi 5796.85 S 39 ZO ~l 4517.33 S 3728.31 Id 5857.18 S 39 32 hi 4551.15 S 3783.3Z ~ 5918.32 S 39 44 bi 4586.04 S 3838.96 Id 5980.T5 S 39 56 bi 4621.41 S 3894.46 bi 6043,,53 S 40 7 ~ 4657.68 S 3949.48 bi 6106.75 S 40 18 bi 4694.13 S 400~,.81 bi 6170.36 S 40 28 bi ~ 4730.27 S 4059.82 ~l 6233.59 S 40 38 ~ ) 4766030 S 4113.01 id 6295.59 S 40 48 bt 4803.15 S 416~o8~ ~ 6357.37 S 40 56 Id L2995.00 10608.73 10553.63 39 27 S 54 41 ~ 6415.97 0000 4838.05 S 4214.10 bi 641&.02 S 41 13 ~ CO#PUTATION DATE: 1T-APR-90 PAGE BP EXPLORATION 1-69/V-19 NPT ENDICOTT NORTH SLOPE, ALASKA DATE OF SURVEY: 30-NAR~90 KELLY BUSHING ELEVATION: 55~10 FT ENGINEER: SALAZAR INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVIATION AZI#UTH DEPTH DEPTH DEPTH 'DEG HIN DEG 0.00 0.00 -55.10 0 0 1000.00 1000.00 944.90 0 14 2000.00 1999.16 1944.06 3 30 3000.00 2992.38 2937.28 '15 29 4000.00 3851.77 3796.67 42 38 5000.00 4578.16 4523.06~ 43 54 6000.00 5297.82 5242.72 43 13 TO00.O0 6037.59 5982.49' 40 52 8000.00 6790.14 6735.04 41 17 9000.00 7562.55 7507.45 38 29 10000.00 8337.02 8281.92 40 22 11000.00 9086.44 9031.34 41 12 12000.00 9852.18 9797.08 39'43 12995.00 10608.73 10553.63 39 ZT VERTICAL DOGLEG RECTANGULAR:COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/1OO FEET FEET FEET DEG 'NZN N 0 0 E 0.00 S 70 6 E -0.63 N 61 54 W 3.26 S 43 47 W 75.81 S 31 0 W 564.17 S 31 30 W 1241.73 S 31 39 M 1927.21 S 30 15 ~ 2589.22 S 42 24 W 3243.33 S 41 33 W 3878.07 S 48 5 M 4509.15 S 45 40 W 5168.39 S 58 33 # 5794.83 S 54 41 ¥ 6415.97 0.00 0.16 0.39 3.29 1.09 0.31 0 0.24 0.24 0.17 0-00 N 0.00 E 0.00 N 0 0 0.53 S 1.88 E 1.95 S 74 14 10.24 N 16.83 W 19.70 N 58 41 19.54 S 93.33 H 95.35 S 78 10 426.55 S 369.24 W 564.17 S 40 53 1014.34 S 725.35 W 1247.01 S 35 34 1605.11 S 1090.12 W 1940.29 S 34 11 2184.01 S 1432.73 M 2612.01 S 33 16 2711.33 S 1822.93 N 3267.17 S 33 55 3183.77 $ 2247-01 N 3896.85 S 35 13 0.88 0.76 0.56 0.00 3636.80 S 2687.93 g 4522.31 S 36 28 H 4100.28 S 3159.83 ~ 5176.57' S 37 37 W 4484.12 S 3673.71 ~ 5796.85 S 39 ZO M 4838.05 S 4214.10 ~ 6416.02 S 41 3 W COMPUTATION DATE: 17-APR-90 PAGE * 6 BP EXPLORATION 1-69/V-19 ENDICOTT NORTH SLOPEr ALASKA DATE OF SURVEY: 30-MAR-90 KELLY BUSHING ELEVATION: 55.10 FT ENGINEER: SALAZAR INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE ~EASUREO VERTICAL VERTICAL DEVIATION'AZIMUTH DEPTH DEPTH DEPTH DEG 0.00 0.00 -55.10 0 0 N 0 0 E 55.10 55.10 0.00 0 14 S 9 25 E 155.10 155.10 100.00 0 8 S 60 16 E 255.10 255.10 200.00 0 5 N 67 42 E 355.10 355.10 300.00 0 4 N 42 51 E 455.10 455.10 400.00 0 5 N 86 20 E 555.10 555.10 500.00 0 7 S 68 11 E 655.10 655.10 600.00 0 10 S 86 56 E 755.10 755.10 700.00 0 14 N 88 52 E 855.10 855.10 800.00 0 16 S 79 22 E 955.10 955.10 900.0.0 1055.10 1055.10 1000.00 1155.11 1155.10 1100.00 1255.11 1255.10 1200.00 1355.11 1355.10 1300.00 1455.13 1455.10 1400.00 1555.14 1555.10 1500o00 1655.22 1655.10 1600.00 1755.42 1755.10 1700.00 1855.64 1855.10 1800.00 1955.66 1955.10 1900.00 2056.04 2055.10 2000.00 2156.22 2155.10 2100.00 2256.35 2255.10 2200°00 2356.47 2355.10 2300.00 2456.60 2455.10 2400.00 2556.73 2555.10 2500.00 2656.96 2655.10 2600.00 0 13 S 82 41 E 0 19 S 83 53 E 0 15 S 82 51 E 0 24 S 74 4O E I I S 87 59 E 0 51 N 89 41 E 0 38 S 61 3 g 3 23 N 65 23 g 3 45 N 61 19 Id 3 49 N 61 16 g 2757.60 2755.10 2700.00 8 6 2858.98 2855.10 2800.00 10 41 2961.42 2955.10 2900.00 14 12 3065.42 3055.10 3000.00 17 26 3171.28 3155.10 3100.00 21 6 3280.13 3255.10 3200.00 25 0 3391.60 3355.10 3300.00 27 24 3505.94 3455.10 3400.00 30 25 3623.00 3555.10 3500.00 32 24 3743.97 3655.10 3600.00 36 9 3871.01 3755.10 3700.00 39 57 4004.54 3855.10 3800.00 42 41 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZo DEPARTUR~ SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG 0.00 0.00. 0.00 N 0.00 E 0.,04 2.80 0.07 $ 0.03 E 0.19 0.66 0.26 S 0.00 E 0.19 0.60 0.30 S 0.05 E 0.18 0.30 0.32 S 0.10 E 0.16 0.02 0.33 S 0.15 E 0.10 0.15 0.35 S 0.26 E -0.07 0.11 0.35 S 0.51 E -0.31 0.00 0.38 S 0.91 E -0.49 0.16 0.45 S 1.27 E -0.75 0.00 0.49 S 1.71 E -0.95 0.00 0.60 S 2.14 E -1.26 0.04 0.63 S 2.66 E -1.48 0.34 0.75 S 3.13 E -2.17 0.72 0.86 S 4.32 E -3.52 1.19 0.73 S 6.23 E -3.46 4.04 1.06 S 6.52 E -1.65 1.71 0.24 S 2.80 E -0.14 0.16 2.67 N 2.88 Id 1.21 0.10 5.88 N 8.65 kg 2.64 0.18 . 8.97 N 14.42 kl 3.97 0.60 11.89 N 19.83 W 5.34 0.42 14.59 N 25.05 g 6.72 0.13 16.85 N 29.76 Id 8.06 0o00 18.91 N 34.21 kg 9.47 0.07 20.95 N 38.72 kg 11.51 1.83 22.47 N 43.60 Id 16.53 3.96 21.53 N 50.18 kg 27.28 4.17 15.47 N 59.61 Id 43.77 3.24 4.14 N 71.72 kg S 42 38 kl 65.91 3.76 S 43 28 Id 94.36 3.20 S 40 57 Id 129.02 3.90 S 40 10 W 171.96 2.48 S 37 24 I~ 221.14 2.51 S 33 48 kg 276.32 2.89 S 29 50 W 336.31 2.59 S 30 3 Id 403°09 3.23 S 30 37 Id 480.08 3.07 S 31 I g 567.20 1.03 0.00 N 0 0 E 0.08 S 22 8 E 0.26 S 0 ¢6 E 0.31 S 9 57 E 0.34 S 17 15 E 0.36 S 23 28 E 0.44 S 35 55 E 0.62 S 55 35 E 0,,99 S 67 29 E 1.35 S 70 21 E 1.78 S 74 9 E 2.22 S 74 29 E 2,,73 S 76 34 E 3.22 S 76 35 E 4.40 S 78 44 E 6.28 'S 83 18 E 6.61 S 80 45 E 2.81 S 85 4 E 3.93 # 47 8 W 10.46 N 55 50 kl 16.98 N 58 7 W 23,.12 N 59 3 28.98 N 59 47 Id 34.20 N 60 29 39.09 N 61 4 Id ,44.03 N 61 35 W 49.05 N 62 44 54.61 N 66 47 61.58 N 75 27 71.84 N 86 42 Id 12.32 S 86.53 kl 87.41 S 81 54 Id 32.94 S 106.19 W 111.18 S 72 46 Id 58.81 S 129'25 kl 142.00 S 65 32 ~ 91o41 S 157.20 g 181.84 S 59 49 Id 129.83 S 187.96 kg 228.44 S 55 22 kg 174.76 S 220.37 Id 281.25 S 51 35 kg 226.69 S 252.02 Id 338.97 S 48 2 ~ 285.68 S 285.89 kg 404.16 S 45 I kl 353.26 S 325.44 ~ ~80.32 S 42 39 Id 429.19 S 370.83 t,I 567.20 S 40 50 g CONPUTATION DATE: 17-APR-90 PAGE ' 7 - BP EXPLORATION 1-69/V-19 #P! END!COTT NORTH SLOPEr ALASKA DATE OF SURVEY: 30-NAR-90 KELLY BUSHING ELEVATION: 55.10 FT ENGINEER: SALAZAR ,: XNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATXO# AZIMUTH DEPTH DEPTH DEPTH DEG HIN DEG 4141032 3955.10 3900.00 43 10 4278.52 4055.10 4000.00 43 11 4415.27 4155.10 4100.00 43 5 4552087 4255.10 4200000 .43 31 4690.62 4355.10 4300.00 43 30 4828089 4455.10 4400.00 44 Z 4968.00 4555010 4500.00 43 54 5106.84 4655.10 4600000 43 59 5246.10 4755010 4700000 44 15 5385.85 4855010 4800.00 44 16 5525026 4955010 4900.00 44 15 5664.46 5055010 5000000 44 3 5803031 5155.10 5100.00 43 46 5941030 5'255010 5200000 43 22 6078.70 5355010 5300.00 43 25 6215096 5455.10 5400000 43 2 6352.44 5555.10 5500.00 42 44 6488031 5655.10 5600.00 42 29 6623036 5755.10 5700000 41 58 6757.51 5855.10 5800000 41 51 6890081 5955.10 5900000 41 0 7023.14 6055.10 6000.00 40 46 7154099 6155.10 6100.00 40 42 7286096 6255.10 6200000 40 46 7419051 6355.10 6300.00 41 3 7552047 6455010 6400.00 41 34 7686.32 6555010 6500000 41 44 7819.86 6655.10 6600.00 41 28 7953033 6755.10 6700.00 41 24 8086.27 6855.10 6800.00 40 57 8218.20 6955010 6900.00 40 31 8349018 7055010 7000.00 39 54 8479.01 7155.10 7100.00 39 29 8607.91 7255.10 7200000 38 54 8736.03 7355.10 7300000 38 25 8863018 7455.10 7400.00 38 0 8990048 7555010 7500.00 38 27 9118038 Y655.10 7600.00 38 43 9246.76 7755.10 7700.00 38 56 9375.40 7855.10 7800.00 39 4 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ- DEPARTUR~ SECTION SEVERITY NORTH/SOUTH EAST/biEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG S 31 10 bi 659.19 S 31 3 W 751.77 S 31 8 bi 843.70 S 31 12 bi 936.86 S 31 18 bi 1030.28 S 31 20 bi 1124.45 S 31 30 bi 1219.83 S 31 37 bi 1314.88 S 31 48 bi 1410.58 S 31 46 bi 1506.98 S 31 26 bi 1602.86 S 31 43 bi 1698.40 S 31 48 W 1793.53 S 31 50 bi 1887.46 S 31 32 bi 1980.47 S 31 29 bi 2073.26 S 30 51 bi 2164.82 S 30 19 bi 2255.32 S 29 59 bi 2344.51 S 29 58 bi 2432031 S 30 9 bi 2518.90 S 30 14 W 2604.08 S 30 39 bi 2688.59 S 31 25 bi 2773042 S 33 37 bi 2859.46 S 38 17 bi 2946.71 S 41 52 bi 3035.66 S 42 11 bi 3124.13 S 42 2! bi 3212.51 S 42 19 bi 3300.07 S 42 5 bi 3386.11 S 41 51 bi 3470.68 S 42 13 bi 3553046 S 42 3 ¥ 3634.77 S 41 38 bi 3714086 S 41 21 bi 3793.39 S 41 34 bi 3872.16 S 41 39 M 3951.88 S 42 14 bi 4032.38 S 43 11 bi 4113.26 0.15 0.23 0042 0 0.11 0.65 0.31 0.30 0.26 0.31 0.86 0.24 0.38 0.30 0 0.51 0.33 0.38 0.58 0.30 0.14 0.75 0.58 0.74 1.79 Z .38 0.81 0.42 0.41 0.54 0.69 0.87 0.19 0.25 0.63 0.15 0.36 0o21 0.34 0.60 509.09 S 419.06 bi 659.38 S 39 28 589.50 S 467.61 al 752.44 669.40 S 515.75 hi 845.04 S 37 37 bi 750029 S 564.63 bi 939001 S 36 58 bi 831.29 S 613.78 ~1 1033.32 S 36 26 bi 912.87 S 663.39 W 1128.46 S' 36 0 bi' 995.42 S 713.76 bi 1224.87 S 35 39 bi 1077.52 S 764.12 kl 1320.96 S 35 Z1 1159.98 S 815.06 t~ 1417.70 S 35 6 bi " 1242093 S 866.52 N 1515.17 S 34 53 bi 1325069 S 917039 ~ 1612.16 S 34 41 bi 1408.25 S 967.97 ~ 1708.84 S 34 30 bi 1¢90.12 S 1018.73 bi 1805.07 S 34 22 bi 1570088 S 1068.94 bi 1900008 S 34 14 bi 1651009 S 1118.37 bi 1994020 S 34 ~7 bi 17'31o23 S 1167.55 ~ 2088.14 S 34 0 bi 1810069 S 1215.64 bi 2180o91 S 33 53 ¥ 1889.91 S 1262.38 ~ 2272.74 :S 33 44 bi 1968.42 S 1307.93 bi 2363.34 S 33 36 bi 2045.92 S 1352.55 bi 2452.58 S 33 28 bi' 2122.19 S 1396.72 ~ 2540.57 S 33 21 W 2197.07 S 1440.34 bi 2627011 S 33 15!bi 2271.21 S 1483.80 bi 2712095 S 33 9 bi 2345.06 S 1528.09 W 2799.00 $ 33 .'5 bi 2418.60 S 1574.58 bi 2885.99 S 33 4 W 2489.67 S 1625.78 bi 2973.48 S 33 9 bi 2557.38 S 1683046 bi 3061.74 S 33 Z1 bi 2623011 S 1742.72 bi 3149025 S 33 36 bi ) 2688.55 S 1802.15 ~ 3236067 S 33 50 bi 2753.27 S 1861.18 W 3323.32 S 34 3 bi 2817.04 S 1918.97 bi 3408.55 S 34 16 bi 2879.97 S 1975050 W 3492039 S 34 27 bi 2941.50 S 2030.90 bi 3574.49 S 34 37 bi 3001.80 S 2085.47 bi 3655.13 S 34 47 bi 3061047 S 2138.91 ~ 3734.64 S 34 56 bi 3120.35 S 2190.87 bi 3812.68 S 35 4 W 3179034 S 2243009 bi 3890.97 S 35 12 ~ 3238.98 S 2296.00 bi 3970.22 S 35 20 bi 3298093 S 2349.75 ~ 4050.22 S 35 28 bi 3358042 S 2404.61 bi 4130.51 S 35 36 bi PAGE COMPUTAT];ON DATE: 17-APR-90 BP EXPLORATZON 1-69/V-19 ENDZCOTT NORTH SLOPE~ ALASKA DATE OF SURVEY: 30-NAR-90 ~/ KELLY BUSHZNG ELEYATZON: 55.10 FT ENGZNEER: SALAZAR XNTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE NEASURED YERTXCAL VERTICAL DEV[ATZON:AZZMUTH DEPTH DEPTH DEPTH DEG MZN DEG NZN VERTZCAL DOGLEG RECTAMGULAR COORDINATES HORZZ. DEPARTURE SECTZON SEVERZTY NORTH/SOUTH EAST/blEST DZST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG MZN 9504.04 7955.10 7900000 38 56 9632.71 8055.10 8000000 39 11 9762032 8155.10 8100.00 39 46 9892.72' 8255o10 8200.00 40 5 10023.76 8355.10 8300000 40 29 10156.01 8455.10 8400000 41 15 10288097 8555.10 85000'00 40 55 10422.03 8655.10 8600000 41 42 10556.65 8755010 8700000 42 8 10690.98 8855.10 8800000 41 43 S 44 21 bi 4194.07 S 45 16 bi 4274.84 S 45 48 bi 4357.03 S 48 22 bi 4524.44 S 49 53 bi 4610.08 S 47 11 bi 4696.75 S 43 8 14 4784.27 S 43 11 bi 4874.33 S 43 33 bi 4963094 0.59 0.39 0.37 0.75 0.90 0.94 3.08 1.44 0.61 0.58 3416.87 S 2460.54 bi 4210.62 S 35 45 bi 3474.28 S 2517.66 bi 4290'59 S 35 56 id 3532006 S 2576.48 bi 4371.92 S 36 7 bi 3589.95 $ 2636.92 td 4454.33 S 36 18 bi 3647o07 $ Z699.43 ~1 4537.40 S 36 30 bi 3703.73 S 2764.84 bi 4621.91 S 36 44 bi 3760.88 S 2631.26 bi 4707.46 S 36 58 bi 3822'96 S 2893.27 bi 4794.38 S 37 7 bi 3888090 S 2954.71 id 4884.04 S 37~14 bi 3954.19 S 3016.21 bi 4973.24 S 37 20 bi 10824.71 8955.10 8900000 41 34 10958029 9055.10 9000.00 41 26 11091.08 9155.10 9100.00 40 56 11222.82 9255.10 9200.00 40 30 11353092 9355.10 9300000 39 47 11483.65 9455.10 940.0000 39 12 11613.27 9555.10 9500000 39 54 11743.37 9655.10 9600000 39 55 11873057 9755010 9700.00 39 48 12003.79 9855.10 9800.00 39 42 S 44 17 bi 5052.59 S 45 19 bt 5140.95 S 46 44 bi 5227.97 S 48 48 bi 5313'12 S 51 43 bi 5396-72 S 54 27 Id 5477051 S 56 18 Id '5557.Z3 S 56 27 Id 5637043 S 57 38 bi 5717.49 S 58 35 # 5797.13 0.30 4018.08 S 3077.85 bi 5061.43 S 37~ 27 bi 0.90 4080.98 S 3140.20 bi 5149.29 S 37 35 0.87 4141.72 S 3203.00 bi. 5235.75 S 37 43 bi lo77 4199.47 S 3266.39 bi 5320.23 S 37 53 bi 1.23 4253.58 S 3331.64 bi 5403.04 S 38 1.41 4303.32 S 3397.64 bi 5482~93 S 38 18 bi 0.58 .4349.8Z S 3465.74 bi15561-68 S 38 33 bi 1.18 4396.00 S 3534.96 W 5640.99 S 38 48 bi 0.61 4441,35 S 3604.93 bi 5720.24 S 39 0.53 4485.38 S 3675.77 bi 5799.14 S 39 20 bt 12133.92 9955.10 9900.00 40 5 12265.79 10055.10 10000.00 41 9 12398061 10155.10 10100.00 41 11 12531.64 10255.10 10200000 41 27 12665.06 10355.10 10300.00 41 4 12796.01 10455.10 10400000 39 33 12925054 10555.10 10500.00 39 27 12995.00 10608073 10553063 39 27 S 58 28 Id 5876.40 S 57 46 bi 5958.47 S 57 3 bi 604Z.18 S 56 35 bi 6126.61 S 56 41 Id 6211.58 S 55 7 bi 6293.13 S 54 41 bi 6373012 S 54 41 bi 6415.97 0.82 0.30 0.82 0.28 1.24 1.41 0.00 0.00 4528069 S 3746.89 Id 5877.77 S 39 36 W 4574.03 S 3819.92 bi 5959.33 S 39 52 bi 4620.92 S 3893.69 bi 6042.66 S 40 7 bi 4669.21 S 3966.94 bi 6126.84 S 40 21 bi 4717.71 S 4040.75 bi 6211.64 S 40 35 M 4764.85 S 4110.93 kl 6293.14 S 40 47 bi 4812.53 S 4178.06 bi 6373.14 S 40 58 bi 4838.05 S 4214.10 bi 6416.02 S 41 3 bi COMPUTATION DATE: 17-APR-90 ~ PAGE BP EXPLORATION 1-69/V-1'9 ENDZCOTT NORTH SLOPEr ALASKA MARKER GCT LAST READ]:NG PBTD DRZLLER"S DEPTH DATE OF SURVEY: 30-MAR-90 KELLY BUSHING ELEVATION: 55.10 FT ENGINEER: SALAZAR , INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION -~ 2238" SNL E. 222:9" MELt SEC36 T12N R16E , MEASURED DEPTH BELOM KB TVD FROM KB SUB-SEA RECTANGULAR'COORDINATES NORTH/SOUTH EAST/WEST 12833°50 1Z899.00 1. Z995.00 10484,.03 10428.93 1053¢.60 10479.50 10608.73 10553°63 ~t778o 72 S ,~802.1'8 S 4838.05 S 4130.36 4164o32 4214o10 COMPUTATION. DATE:: 1T-APR-.90 BP EXPLORATZON 1-69/V-19 ENDICOTT NORTH SLOPEr ALASKA ;ELLY MARKER PBTD DRZLLER" S DEPTH SURFACE LOCATXON = 2238 N:EASURED DEPTH TVD BELOW KB FRON KB SUB-SEA 12899.00 1053~.60 10~79.50 12995.00 10608.73 10553.63 FZNAL MEASURED DEPTH NELL LOCATION AT TD: TRUE SUB-SEA VERT]'CAL VERTICAL DEPTH DEPTH 1Z995.00 10608.73 10553.63 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET OEG 6416o02 PAGE '10 DATE OF SURVEY: 30-1NAR-90 BUSHZNG ELEVATION: 55"10 FT ENGINEER: SALAZAR 2229" ~IEL~ SEC36 T12N R16E RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 480Zo78 S 4164,.32 ~ 4838..05 S 4214.10 Id SCHLUMBERGER O ~ RECT T ONtCtL SURVEY COMPANY BP EXPLORATION WELL i-BB/V- i9 MPI FIELD END I COTT COUNTRY USA RUN ONE DATE LOOOED SO - MAR - 90 REFERENCE 73794 WELL 1-69/V-19 MPI 2238' ~SNL, 2229' Wt._, SEC 36, T12N, R16E HORIZONTAL PROJECTION NO~r~ ZOO0 1000 -SO00 $CPi£ = 1/1000 IN/FT .-i-2--i-.:-i-4-4-~-4..4.4-2-~.-~-k4--~-L~.,--L;-i-L.L.L.LL~ ...... :...~..~..~_.4..~,_~...~...,~...t...~.~_.i__i...~...L.L.L~...~ .-.~+~,.+,4..~.-¢4-..~.4.+.~-+.~-tI:'4''4'''+''~ ............. ~-.~...~...:.-~...~ , ........ ...... ~ ~.-.~.-+.-~.-~..~ .............. ~¢'~"~ ......... ~ ........... ~ ....... ~ .-;-4.-.;-.i .... j ¢.-4-M.-& --4-&~-&- ..&-4..4.--~ .......... ..~...;....i.. * .......... ; ............. ~ :~, .'"* ......................... : ;..t ...... ;. i...~... "?~-'~' ~?'"'?'T'~-T T'r'T'T'~ T'i-~'"~ ~ ......?"~"~' ....... ....... ~-~"'~ .......... ~ ...... TT'T'"~ ....... T'~ ........ ':~'"~'~'~ ;~:T':- · --F+++.,-+--4.++4...+-+-.-+-+4..-+--i-+-~ ...... ~-.¢..;...~....~ ..~..~-..: ........... ; ....... :.+...~ ...... '- ...... } ....... : ¢.. ~. ..:-., .¢ ...... ......· ~'"'""~ ~ ,.~ *"~"~'"~":~:"~"'""'"~", ,'?'~'"~.. . .. ...... ~"~"'"'~'"',, · , ....... _,-~:"~'"' ....... ~'"'"~,.-- ....... 4 ~'"'"'"'~.,~ ..... t ',... ..... ~.*.~ · · · .~ ....... :"' ...... · ..;..4..4...~.4...&-~...4-;. ..;-..~...¢..4....4...;..4..4... -4...;--,..x...+ ............. = ....... :...~..+.~..+.~...~...*.-4 ......., ..4 ................... ~ ...... ;... ...?..?. t ~. 4.~ ~-: 4. +. ~ ~. -: * ~, ~ ~. ;. ~: *, 4. i, -, +. ~ .... ...... ;-...,. .......... ................... + ...... ~...~ ...... ,. ......... ; ...... ;...;--~...; ..... ;...; ..... 4 ; ............. ,~'..~..-.-~-..;..-}--4..... .......... ~-.... ...... ; ........ ~4 *"&'+'~ ................................... ~ . ~ .............. ; .... , :: .... ........ .~ .... :._..:....: ....~.. :........ .......... ?T' .'w.~'*'?'~ t ?'T ~ ~ T ~ ~ T t ~ t ~ ~ ~ ..... * ................. ~ .......... ~ ..... T ................. 1 . ; . . .??..T-.?T.W-T--~ ~ ....... , ..... ¢-..v.? ....... r.? ....... :'"~'"1 · ~...~.f...~ ~.4.-, .......... + .......... ,.+.. ' ...... ~...+'"?~'"+".~'."."'""..'''"+"'"+"'""""'"~ ~ .... ~ - , ,,..;...;....;...,...~ ........ ;...;.. ~ - ~ I - .... 4,..4...4..4.,.+...4...4...+...~ ... .... ?;..4..2.,.1...; ..: ....... -~000 -40OO -~0 -2000 - 1000 0 1000 2000 WELL 1-69/V-19 MPI~'--'~ ~ VERTICAL PROJECTION 2238' .SNL, 2229' WL SEC 36, T12N, R16E 41. -4000 -~000 0 0 ~000 4000 ~000 8000 10000 PI~O,J~CTION ON VERTICI~. PLi:INE ?~1. - 4]. SCI:I.ED IN YEJ~TICi~L DIEPTI-~ HORIZ $CRLE = 1/2000 IN/FT 2000 221. GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION MPI 1-69/V-19 WELL NAME ENDICOTT, ALASKA LOCATION AL 3-90-D10 SURFACE GYRO 3/20/90 JOB NUMBER BRIAN WEST TYPE SURVEY DIRECTIONAL SUPERVISOR DATE NAME TITLE SIGNATURE 0 FT 11537 FT DEPTH INTERVAL FROM TO 3/2/90 3/18/90 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. IC OFILMED GREAT LAND DIRECTIONAL DRILLING,INC 3-20-9 Client .............. : BP EXPLORATION Well ................ : MPI #1-69/V-19 Vertical Section at.: S 39.26 W Magnetic Declination: 30 deg 36 min E Data file name ...... : B:MV19D.DAT RECORD OF SURVEY (Well assumed vertical to MD of Computation: RADIUS OF CURVATURE Survey date: 3-2-90 Method ..... : SURFACE GYRO RKB Height.: 55.1 ft 0.0) MEAS DEPTH DG MN DRIFT TRUVERT SUBSEA SECTION DEPTH DEPTH DIST 0 473 976 1463 1541 0 0 0.00 -55.10 0 0 473.00 417.90 0 30 975.99 920.89 1 15 1462.93 1407.83 0 30 1540.92 1485.82 DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E -0.94 S 76.00 E -3.99 S 74.00 E -3.33 S 65.00 W 0.00 N 0.00 E 0.00 N 0.00 E 0.53 S 2.13 E 2.46 S 9.31 E 3.37 S 9.38 E CLOSURE DISTANCE DG MN S 0.00 N 0 0 0 E 0.00 N 0 0 0 E 2.19 S 76 0 0 E 9.63 S 75 13 40 E 9.97 S 70 13 59 E DOG LE deg/10 0.00 0.00 0.09 0.15 0.96 1647 1942 2227 2506 2616 3 0 1646.87 1591.77 3 45 1941.35 1886.25 3 0 2225.86 2170.76 3 15 2504.44 2449.34 4 18 2614.20 2559.10 -1.46 N 60.00 W 0.73 N 56.00 W 1.39 N 50.00 W 3.44 N 67.00 W 7.~50 S 76.00 W 3.24 S 6.27 E 5.96 N 8.45 W 16.06 N 21.84 W 23.97 N 34.77 W 24.53 N 41.86 W 7.06 S 62 42 36 E 10.34 N 54 47 14 W 27.11 N 53 40 55 W 42.23 N 55 24 32 W 48.52 N 59 37 35 W 2.36 0.25 0.26 0.09 0.97 2710 - 6 42 2707.76 2652'.66 2805 9 36 2801.79 2746.69 2900 12 12 2895.07 2839.97 2995 15 24 2987.32 2932.22 3089 18 18 3077.27 3022.17 15.53 S 55.00 W 28.70 S 47.00 W 46.60 S 41.00 W 69.20 S 45.00 W 96.35 S 43.00 W 20.82 N 50.01 W 12.35 N 60.47 W 0.56 S 72.94 W 17.13 S 88.39 W 36.73 S 107.32 W 54.17 N 67 23 59 W 61.72 N 78 27 23 W 72.94 S 89 33 23 W 90.04 S 79 1 50 W 113.43 S 71 6 22 W 2.57 3.06 2.75 3.38 3.09 3183 21 48 3165.56 3110.46 3278 25 12 3252.67 3197.57 3372 26 54 3337.11 3282.01 3497 30 30 3446.74 3391.64 3579 31 48 3516.92 3461.82 3681 35 0 3602.06 3546.96 3775 37 54 3677.66 3622.56 3870 40 48 3751.12 3696.02 3964 42 18 3821.46 3766.36 4058 43 6 3890.54 3835.44 128.53. S 43.00 W 166.34 S 41.00 W 207.61 S 38.00 W 267.55 S 35.00 W 309.61 S 29.00 W 364.94 S 30.00 W 420.05 S 30.00 W 479.49 S 30.00 W 541.03 S 30.00 W 603.94 S 30.00 W 60.29 S 129.29 W 88.44 S 154.63 W 120.29 S 180.89 W 168.53 S 216.58 W 204.48 S 239.05 W 253.35 S 266.69 W 301.71 S 294.62 W 353.87 S 324.73 W 407.86 S 355.90 W 463.07 S 387.78 W 142.66 S 64 59 52 W 178.14 S 60 13 59 W 217.23 S 56 22 34 W 274.43 S 52 6 45 W 314.58 S 49 27 22 W 367.85 S 46 28 13 W 421.69 S 44 19 7 W 480.28 S 42 32 29 W 541.31 S 41 6 30 W 603.99 S 39 56 35 W 3.72 3.59 1.92 2.94 2.57 3.15 3.08 3.05 1.59 0.85 MPI #1-69/V-19 3-20-90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION DEPTH DG MN DEPTH DEPTH DIST ANGLE 6106.16 6051.06 2659.11 6178.29 6123.19 2720.21 6249.45 6194.35 2781.00 6356.62 6301.52 2873.41 6427.24 6372.14 2935.29 7095 40 30 7190 40 42 7284 40 54 '426 41 6 41 30 7554 41 48 6452.64 6397.54 2957.89 7636 41 42 6513.82 6458.72 3012.47 7731 41 30 6584.86 6529.76 3075.47 7831 41 30 6659.76 6604.66 3141.66 7925 41 30 6730.16~ 6675.06 3203.87 8027 41 12 8121 40 48 8216 40 24 8311 40 6 8405 39 42 8506 39 18 8601 38 54 '03 38 36 ~854 38 6 8947 38 18 9049 38 42 9144 39 0 9246 39 0 9365 39 6 9443 38 54 6806.73 6751.63 3271.15 6877.67 6822.57 3332.69 6949.80 6894.70 3394.38 7022.31 6967.21 3455.66 7094.42 7039.32 3515.89 7172.36 7117.26 3580.06 7246.08 7190.98 3639.93 7325.63 7270.53 3703.72 7444.05 7388.95 3797.34 7517.13 7462.03 3854.84 7596.96 7541,86 3918.32 7670.94 7615.84 3977.88 7750.21 7695.11 4042.04 7842.63 7787.53 4116.98 7903.24 7848.14 4165.98 7977.23 7922.13 4225.32 8043.33 7988.23 4278.49 8120.61 8065.51 4341.59 8192.83 8137.73 4401.34 8264.78 8209.68 4461.41 9538 38 48 9623 39 6 9723 39 42 9817 39 54 9911 40 12 RELATIVE COORDINATES FROM WELL-HEAD S 30.00 W 2241.02 S 1459.97 W S 31.00 W 2294.29 S~ 1491.35 W S 31.00 W 2346.94 S 1522.99 W S 33.00 W 2425.94 S 1572.35 W S~ 38.00 W 2476.43 S 1608.37 W S 39.00 W 2494.11 S 1622.43 W S 42.00 W 2535.63 S 1657.89 W S 42.00 W 2582.50 S 1700.09 W S 42.00 W 2631.74 S 1744.43 W S 42.00 W 2678.03 S 1786.11 W S 43.00 W 2727.71 S 1831.63 W S 43.00 W 2772.81 S 1873.69 W S 43.00 W 2818.03 S 1915.86 W S 42.00 W 2863.28 S 1957.32 W S 42.00 W 2908.09 S 1997.67 W S 42.00 W 2955.83 S 2040.66 W S 41.00 W 3000.71 S 2080.36 W S 42.00 W 3048.52 S 2122.66 W S 41.00 W 3118.69 S 2184.74 W S 40.00 W 3162.42 S 2222.09 W S 41.00 W 3210.70 S 2263.33 W S 41.00 W 3255.68 S 2302.43 W S 41.00 W 3304.12 S 2344.54 W S 41.00 W 3360.71 S 2393.72 W S 44.00 W 3396.89 S 2426.88 W S 45.00 W 3439.40 S 2468.65 W S 45.00 W 3477.18 S 2506.43 W S 46.00 W 3521.67 S 2551.70 W S 46.00 W 3563.47 S 2594.99 W S 46.00 W 3605.48 S 2638.50 W CLOSURE DISTANCE DG MN S 2674.64 S 33 5 0 W 2736.40 S 33 1' 30 W 2797.78 S 32 58 50 W 2890.93 S 32 56 56 W 2952.89 S 33 0 9 W 2975.38 S 33 2 39 W 3029.52 S 33 10 41 W 3091.86 S 33 21 27 W 3157.39 S 33 32 17 W 3219.01 S 33 42 5 W 3285.62 S 33 52 52 W 3346.52 S 34 2 54 W 3407.61 S 34 12 36 W 3468.36 S 34 21 23 W 3528.13 S 34 29 12 W 3591.83 S 34 37 14 W 3651.32 S 34 43 59 W 3714.72 S 34 50 57 W 3807.80 S 35 0 45 W 3865.05 S 35 5 38 W 3928.27 S 35 10 52 W 3987.56 S 35 16 5 W 4051.43 S 35 21 31 W 4126.05 S 35 27 40 W 4174.76 S 35 32 37 W 4233.64 S 35 40 9 W 4286.37 S 35 47 6 W 4348.95 S 35 55 34 W 4408.20 S 36 3 46 W 4467.79 S 36 11 48 W DOG LE deg/10 0.42 0.49 0.21 0.62 2.37 1.57 1.62 0.21 0.00 0.00 0.51 0.42 0.42 0.53 0.42 0.39 0.59 0.48 0.41 0.46 0.54 0.31 0.00 0.08 1.53 0.42 0.35 0.72 0.21 0.31 MPI #1-69/V-19 3-20-90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 10013 40 30 8342.51 8287.41 4526.76 S 49.00 W 3650.09 S 2687.18 W 10108 41 6 8414.43 8359.33 4587.84 S 50.00 W 3690.41 S 2734.38 W 10267 40 36 8534.70 8479.60 4690.34 S 48.00 W 3758.63 S 2812.87 W ~ '353 41 12 8599.70 8544.60 4746.25 S 44.00 W 3797.74 S 2853.36 W _.475 42 0 8690.93 8635.83 4827.07 S 42.00 W 3856.97 S 2908.60 W 10570 42 0 8761.53 8706.43 4890.53 S 43.00 W 3903.84 S 2951.55 W 10671 41 42 8836.77 8781.67 4957.73 S 44.00 W 3952.72 S 2997.93 W 10751 41 42 8896.50 8841.40 5010.77 S 44.00 W 3991.00 S 3034.90 W 10851 41 42 8971.16 8916.06 5077.06 S 44.00 W 4038.85 S 3081.11 W 10946 41 30 9042.20 8987.10 5139.87 S 45.00 W 4083.84 S 3125.32 W 11041 41 12 9113.52 9058.42 5202.26 S 46.00 W 4127.83 S 3170.08 W 11136 40 42 9185.27 9130.17 5263.95 S 48..00 W 4170.29 S 3215.62 W 11230 40 24 9256.69 9201.59 5324.18 S 50.00 W 4210.38 S 3261.73 W 11320 40 0 9325.44 9270.34 5381.16 S 51'00 W 4247.33 S 3306.56 W 11415 39 30 9398.48 9343.38 5440.28 S 54.00 W 4284.31 S 3354.75 W 11537 39 12 9492.82 9437.72 5515.09 S 54.00 W 4329.78 S 3417.33 W CLOSURE DISTANCE DG MN S 4532.56 S 36 21 37 W 4593.03 S 36 32 11 W 4694.63 S 36 48 37 W 4750.21 S 36 55 7 W 4830.76 S 37 1 14 W 4894.04 S 37 5 30 W 4961.01 S 37 10 42 W 5013.85 S 37 15 2 W 5079.92 S 37 20 20 W 5142.51 S 37 25 35 W 5204.65 S 37 31 24 W 5266.07 S 37 38 6 W 5326.00 S 37 45 52 W 5382.67 S 37 54 3 W 5441.47 S 38 3 43 W 5515.89 S 38 16 58 W DOG LE deg/10 1.27 0.77 0.61 2.13 0.98 0.47 0.52 0.00 0.00 0.50 0.55 1.03 0.94 0.63 1.38 0.24 MPI #1-69/V-19 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3-20-90 MEAS. DEPTH 55 155 255 355 455 TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DIFF. CORRECT m~ m 55 0 0 0 155 100 0 0 255 200 0 0 355 300 0 0 455 400 0 0 555 555 500 0 0 655 655 600 0 0 755 755 700 0 0 855 855 800 0 0 955 955 900 0 0 1055 1155 1255 1355 1455 1555 1655 1755 1856 1956 2056 2156 2256 2356 2457 2557 2657 2758 2859 2962 1055 1000 0 0 1155 1100 0 0 1255 1200 0 0 1355 1300 0 0 1455 1400 0 0 1555 1500 0 0 1655 1600 0 0 1755 1700 0 0 1855 1800 1 1 1955 1900 1 0 2055 2000 1 0 2155 2100 1 0 2255 2200 1 0 2355 2300 1 0 2455 2400 2 1 2555 2500 2 0 2655 2600 2 0 2755 2700 3 1 2855 2800 4 1 2955 2900 7 3 RELATIVE COORDINATES FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.09 S 0.35 E 0.19 S 0.77 E 0.30 S 1.19 E 0.40 S 1.62 E 0.51 S 2.04 E 0.84 S 3.30 E 1.24 S 4.77 E 1.63 S 6.25 E 2.03 S 7.72 E 2.42 S 9.20 E 3.35 S 8.97 E 2.98 S 5.86 E 0.14 N 0.86 E 3.27 N 4.14 W 6.45 N 9.10 W 10.00 N 13.81 W 13.55 N 18.51 W 16.89 N 23.20 W 19.73 N 27.84 W 22.57 N 32.48 W 24.23 N 38.04 W 22.91 N 45.42 W 16.56 N 55.28 W 4.97 N 67.60 W 11.35 S 82.99 W MPI #1-69/V-19 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3-20-90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 3066 3172 3281 3393 3507 3625 3747 3875 4010 4146 4284 4421 4558 4696 4834 4973 5112 5251 5391 5530 5670 5808 5947 6084 6221 6357 6493 6628 6762 6895 3055 3000 11 4 3155 3100 17 6 3255 3200 26 9 3355 3300 38 12 3455 3400 52 14 3555 3500 70 18 3655 3600 92 22 3755 3700 120 28 3855 3800 155 35 3955 3900 191 36 4055 4000 229 38 4155 4100 266 37 4255 4200 303 37 4355 4300 341 38 4455 4400 379 38 4555 4500 418 39 4655 4600 457 39 4755 4700 496 39 4855 4800 536 40 4955 4900 575 39 5055 5000 615 40 5155 5100 653 38 5255 5200 692 39 5355 5300 729 37 5455 5400 766 37 5555 5500 802 36 5655 5600 838 36 5755 5700 873 35 5855 5800 907 '34 5955 5900 940 33 RELATIVE COORDINATES FROM WELL-HEAD 31.90 S 102.65 57.50 S 126.69 89.36 S 155.39 128.20 S 186.74 172.81 S 219.26 226.40 S 251.45 287.27 S 286.28 356.92 S 326.50 434.74 S 371.42 514.85 S 418.89 594.91 S 467.71 675.40 S 516.07 756.67 S 564.07 838.23 S 612.55 919.82 S 662.27 1001.73 S 712.47 1083.43 S 763.21 1165.71 S 814.62 1248.66 S 865.80 1331.86 S 916.79 1414.01 S 968.10 1495.37 S 1019.39 1575.75 S 1070.52 1656.29 S 1119.55 1736.66 S 1167.84 1816.22 S 1215.47 1895.44 S 1261.72 1974.12 S 1307.11 2051.80 S 1351.06 2128.02 S 1394.74 W W W W W W W W W W W W W W W W W W W W W W W W W MPI #1-69/V-19 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3-20-90 MEAS. DEPTH 7028 7159 7291 7424 7557 7691 7825 7958 8091 8223 8354 8484 8613 8741 8868 8996 9124 9252 9381 9510 9638 9768 9898 10030 10162 10294 10427 10561 10696 10829 mmmmmmmm TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DIFF. CORRECT 6055 6000 973 33 6155 6100 1004 31 6255 6200 1036 32 6355 6300 1069 33 6455 6400 1102 33 6555 6500 1136 34 6655 6600 1170 34 6755 6700 1203 33 6855 6800 1236 33 6955 6900 1268 32 7055 7000 1299 31 7155 7100 1329 30 7255 7200 1358 29 7355 7300 1386 28 7455 7400 1413 27 7555 7500 1441 28 7655 7600 1469 28 7755 7700 1497 28 7855 7800 1526 29 7955 7900 1555 29 8055 B000 1583 28 8155 8100 1613 30 8255 8200 1643 30 8355 8300 1675 32 8455 8400 1707 32 8555 8500 1739 32 8655 8600 1772 33 8755 8700 1806 34 8855 8800 1841 35 8955 8900 1874 33 RELATIVE COORDINATES FROM WELL-HEAD 2202.98 S 1438.01 W 2277.16 S 1481.26 W 2351.10 S 1525.59 W 2424.82 S 1571.65 W 2495.78 S 1623.86 W 2562.86 B 1682.41 W 2628.68 S 1741.67 W 2694.21 S 1800.94 W 2758.46 S 1860.31 W 2821.33 S 1918.89 W 2883.66 S 1975.67 W 2945.26 S 2031.14 W 3006.13 S 2085.15 W 3065.99 S 2138.11W 3125.30 S 2190.39 W 3185.39 S 2241.71 W 3246.05 S 2294.05 W 3307.12 S 2347.14 W 3368.15 S 2400.55 W 3426.68 S 2456.16 W 3483.95 S 2513.33 W 3541.63 S 2572.38 W 3599.83 S 2632.64 W 3657.15 S 2695.44 W 3713.48 S 2760.92 W 3770.90 S 2825.58 W 3833.71 S 2886.90 W 3899.57 S 2947.63 W 3964.47 S 3009.28 W 4028.56 S 3071.17 W MPI #1-69/V-19 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT' 10963 11096 11228 11359 11488 9055 9000 1908 34 9155 9100 1941 33 9255 9200 1973 32 9355 9300 2004 31 9455 9400 2033 29 RELATIVE COORDINATES FROM WELL-HEAD 4091.80 S 4152.44 S 4209.49 S 4262.35 S 4311.60 S 3133.41 W 3196.47 W 3260.71 W 3326.13 W 3392.31 W 3-20-90 MPI #1-69/V-19 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH 3-20-90 MEAS. DEPTH 1000 2000 3000 4000 5000 TRU VERT SUB SEA DEPTH DEPTH 1000 945 1999 1944 2992 2937 3848 3793 4575 4520 6000 5294 5239 700'0 6034 5979 8000 6786 6731 9000 7559 7504 10000 8333 8278 11000 9083 9028 RELATIVE COORDINATES FROM WELL-HEAD 0.63 S 2.48 E 8.02 N i1.18 W 18.17 S 89.40 W 429.00 S 368.11 W 1017.66 S 722.23 W 1607.04 S 2187.37 S 2714.56 S 3187.51 S 3644.41 S 1089.69 W 1429.00 W 1819.58 W 2243.52 W 2680.98 W 4108.84 S 3150.76 W ~750 3300 2850 7700 9350 icn~J.._,A._. ,..,CC. lul'l ,~!Pi #!-6g,'7-19 SECTiOH AT S 39.26 TVD SCALE' ! :nth = I!00 feet 3RA'A/h; '3-20-90 Marker Identification MD TVB DEPRT A) KB 0 0 0 r ..................................... B] Tn 11537 9493 5515 L ........... i ............................ i ........................ i_. J ._i i i ~ 0 550 t ~.00 i650 2200 2750 32.00 3fi~'O 4400 4gSO 5500 6050 Departure Marker Identlfication MD TVD OEPRT Al KB 0 0 0 B) TD ~537 9493 55~5 7 PLAN V,~EX 'BP EXFLORAT_~ON !MFI ~!-69/V-19 {CLOSURE: 55!6 ft S 38.3 ~ OECLINATiON: 30.60 deg E {SCALE' & inch = 700 feet ( ¢ORAWN ' 3-20-90 /,, 350 // ,'7,=0 i i ! · i- ~ i / : / t ; ~ , 3500 ; s°i 4200]'-- .............. z-¢ ...... ri ..................... r ................ . ii ...................................................... [ l! ..... ' ............. 4~50 ............. L ............... } ................. 3850 ~00 3~50 2BO0 2450 2*.00 :t750 :I, 400 ~,050 700 250 0 350 PERMIT a ~ o _ ~ ~ WELL NAME . .. U~LE l lUm~ DATE ~ i / o ~u. COt~ACT ......AOGCC GEOLOGICAL MATERIALS INVENTORY LIST [, check off or !!§t data as it is received ) ~4°7 ! ??~/? ° drilling history ~' s.rvey ! ~F"'"h t~t~ I rare desription j cored i~te~als core analysis d~ ditch inte~als digital data mm mi mmm m ,m m mm m m mmmm m m m m m m m I ii LOG TYPE RUN INTERVALS SCALE NO. I ~, ~"~z ~/~ ~.p / //~v~- /~2~ ., ./ , ( / /~ / - ~ ' ,, , , , .... i i i i *TMD 12750' - 14222' Halliburton Run No. 1 WELL 1-63/T-22 *TEMPERATURE SURVEY 12180' - 13093 Run No. 1 Camco WELL 1-67/T-20 *PRODUCTION PROFILE./ '11275' - 11800' Run No. 2 Camco WELL 1-69/V-19 *DUAL LATEROLOG 11521' - 12994' Halliburton *SPECTRAL DENSITY 11524' - 12994' Halliburton Run No. 1 Run No. 1 *R~-i- Run No. 1 Halliburton *CET 3100' - 12898' Schlumberger *CBT 3100' - 12872' Schlumberger *PERFORATING RECORD 11125' - 12874 Schlumberger WELL 2-04/M-19 *PRODUCTION PROFILE 10300' - 10685' Camco Run No. 1 Run No. 1 Run No. 1 Run No. 1 WELL 2-14/O-16 *PRODUCTION PROFILE 10300' - 10998' Camco Run No. 1 ,,,W,,ELL 2-1 ~/L-16 *DUAL LATEROLOG 10100' - 11428' Atlas Run No. 1 March ], 1990 Telecopy No. (907) 276-7542 M E Miller Endicott Lead Engineer BP Exploration (Alaska) inc P O Box 196612 Anchorage, AK 99519-6612 Re: Duck Island Unit/Endicott 1-69/V-19 MPI BP Exploration~ (Alaska) Inc Permit # 90-29 Surf Loc 2238'SNL, 2229'WEL, Sec 36, T12N, R16E, UM Btmhole Loc 1942'SNL, 1044'WEL, See 02, TllN, R16E, UM Dear Mr Miller: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made, To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 'hOurs prior to co~encing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Vgr. y truly C V Chatterton Chairman Alaska Oil and Gas Conservation Go~ission BY O~ER OF THE COMMISSION jo Enclosure Department of Fish & Game, Habitat 'Section - w/o encl Department of Environmental Conservation - w/o encl BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 16, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton 1-69/V-19 MPI (Endicott) Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above-named well. Also included are the attachments listed on the application form, and a check in the amount of $100 to cover the permit filing fee. Yours very truly, M. E. Miller Endicott Lead Engineer MEM/KTH CC Richard Loveland Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill !-Iilb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration BKB=56 fee t Endicott Fie/d/Endicott Pool 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 34638 4. Location of well at surface ?. Unit or property Name 11. Type Bond(see 2o ^^c 25.o2s) 2238' SNL, 2229' WEL, Sec. 36, T12N, R16E Duck Island Unit/Endicott At top of productive interval 8. Well number Number 1640' SNL, 780' WEL, SEC. 02, T11N, R16E 1-69/V-19 MPI 2S100302630-277 At total depth 9. Approximate spud date Amount 1942' SNL, 1044' WEL, SEC 02, T11N, R16E March 4, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MDandTVD) p rop~[~/., line 34633 @ 1942' feet 1-67/T-20 @1084'/8.6feet 2560 13036'MD/1065 6'TVD f o e t 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^AC 2S.035 (e)(2)) Kickott depth 2550 feet Maximum hole angle 41.70 Maximum surface 3900 pslg At total depth (TVD) 10000'/4890 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" Struct. Drive Pipe 75' Surface 131' 131' Drive 17-1/2" 13-3/8" 68# ,Tsocy~E BUTT 2444' Surface 2500' 2500' 2700 cu fl Permafrost 12-1/4" 9-5/8" 47# NT80S NSCC 10091' Surface 10147' 8500' 12-1/4" 9-5/8" 47# NTgSHS NSCC 1267 10147' 8500' 11414' 9446' 575 cu ft Class G 8-1/2" 7" 29# NTgSHS TKC 1872 11164' 9259' 13036' 10656' 575 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Intermediate ' ~ Production Liner i~; · Perforation depth: measured true vertical ~ ~'; ;~:-' 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling Pr' Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the fore~o~ing is true and correct to the best of my knowledge Signed,~-~ ~ ~ ~ Title Endicott Lead Engineer Date 2~/~_[/~ Commission Use Only ~ / Permit Number IAPI number JApproval date JSee cover letter ~0-2..'~ 150- c,2_~- z2. o~ I n'~/n~/~n Ifor other requirements Conditions of approval Samples req,uir.ed [] Yes ,~.NO Mud log req~uT.r~d'' -ETY"es ~1~ No Hydrogen sulfide measures D__Yes ~ No D, ir..ectioh(a[/survey required JCl'Yes [] "NO Requi.red worki, pg~'~es.G.s~rf~B~DJ;~E'' ~2M,; ,J~,3M; ~I~5M; I'-IIOM; I--115M; . PP ..... -/-',- Commissioner the comm,ssion Date Form 10-401 Rev. 12-1-85 Submit ~ 'iplicate PROPOSED DRILLING AND COMPLETION PROGRAM WELL 1-69/V-19 (MPI) Objective Well 1-69/V-19 will be drilled as a water injection well. Zones 3C/3B are the primary objectives. The completion will be run at the time of drilling and will consist of a packer tailpipe assembly. Operation Execute a rig move to slot 1-69 and rig-up. Vertically drill 17-1/2" hole to 2500 ft. Run and cement 13-3/8" 68#/ft., NT-80CYHE Buttress casing to surface. Pressure test casing. Install BOPE. Maximum BHP is 4890 psi at 10000 ft. TVDss. Maximum possible surface pressure is 3900 psi based on a full gas column. Drill out casing and 5 ft. of new hole and conduct a formation leak-off test. Vertically drill 12-1/4" hole to 2550 ft., then directionally drill to the intermediate casing point above the Kekiktuk formation. Run and cement 9-5/8" 47#/ft., NT80S and NT95HS, NSCC casing. No abnormal pressures are expected in the 12-1/4" hole section. Pressure test casing. Drill out casing shoe. Drill 8-1/2" hole to TD. Run open hole logs. Run and cement 7" 29#/ft, NT95HS buttress (TKC) liner to TD with approximately 250 ft. of lap in the 9- 5/8" casing. Clean out to float collar. Change over to NaC1 packer fluid. Test casing and lap to 3000 psi. Run CET/CBT/GR/CCL in 7" liner and in the 9-5/8" casing to the top of cement behind the 9-5/8" casing. Run a gyro survey from PBTD to surface. Complete with a packer tailpipe completion. Perform MIT on completion. A sub surface safety valve will be installed below base of permafrost. Nipple down BOPE. Install tree on wellhead and release rig. Fluids incidental to the drilling of a well will be pumped down the 13-3/8" by 9- 5/8" annulus of the well. Once the rig is released the 13-3/8" x 9-5/8" annulus will be freeze protected with a non-freezing fluid down to 3000 feet. Additionally, the well will be perforated with wireline conveyed guns. Note' testing casing, production liner, liner lap, and performing MIT. Notify Alaska Oil and Gas Conservation Commission prior to pressure KRL 2/8/90 ENDICOTT PROPOSED DIAGRAM WELL 1-69/V-19 (MPI) NON-FREEZING FLUID TVD (BF;B) MD (BKB) 30"DRIVE PIPE 131 FT 131 FT , BASE PERMAFROST 1466 FT 1466 FT SSSV 1550 FT 1550 FT 13-3/8" 68~/FT NT-8OCYHE BTC 2500 FT KOP(DIR:S39.3° W' ANGLE: 41.7DEG) 2500 FT 2550 FT BOTTOM OF FREEZE PROTECTION (ESTIMATED) 3000 FT 4-1/2", 12.6~/FT L-8OTDSTUBING W/ 4-1/2" TAILPIPE TOP OF 9-5/8" CEMENT 9-5/8" 47~/FT NT80S NSCC (ESTIMATED) 9614 FT 8500 FT 1 O1 47 FT 4-1/2" SLIDING SLEEVE 9-5/8" PACKER 7" LINER TOP 9222FT l lll4FT 9259 FT 11164 FT 9-5/8" 47~/FT NT95HS NSCC 9446 FT 11414 FT 7" PACKER PLUG BACK TD 7" 29~/FT NT95HS TKC LINER 12956 FT 10656 FT 13036 FT KRL/2-8-90 BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER 2" KILL LINE I I I PI PE RAMS ! BLIND RAMS I MANUAL HYDRAULIC GATE GATE DRILLING SPOOL , , PI PE RAMS ,! ! , I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE ENDICOTT DEVELOPMENT WELL 1-69/V-19(MPI) SLOT 1-69 SURFACE LOCATION X = 258,969 FT;Y = 5,982,179 FT 2238 FT SNL; 2229 FT WEL SEC 36, T12N, R16E TRUE NORTH GRID S 39° 15'W DEPARTURE TO TARGET: 6048 FT 12433 FT MD 10206 FT TVD BKB DEPARTURE TO BHL: 6449 FT 13036 FT MD 10656 FT TVD BKB NOTE: THE NEAREST WELL TO 1-69/V-19 IS 1-67/T-20 LOCATED 10 FT NORTHEAST AT SLOT 1-67. KRL/2-8-90 14 0 i i_ . __ iiii ..... ~- '~i I i I~,0 0 ~ 20 I08 2'2 0 53 0 CERTIFICATE OF SURVEYOR o I heathy certify that I mn properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents on proposed location for the Well numbera shown cibove. All survey&rig was dane bY me or under ~y mupervis~n, and that .11 dimensions end details ere correct. NO YES' DRW. 116-85 SHEET 2 of I0 REV. 0 Indicates well Indicates Calcblated Section Cerner Position Indicates Perpendicular Offset Distance Indicates IKer~endicular Offset Distance )endiculor ~stonc~ PLAT OF MPI PROPOSED WELL LOCATIONS L~)CATED IN SEC.~I,T. IZN.,R. IIE. UMIAT M. PREPARED FOR SOHIO ALASKA PETROLEUM CO. PREPARED BY DATE: NOV. I$, F.R. BELL a ASSOC.' SCALE, I". SO' PRUDHOE BAY OFFICE PRUDI'IOE BAY, ALASKA CHECKED BY' III I II II ~11 - II --- I J ..... II WELL /biff ZOl~ $ UTk jIEE 6 LIITZTUIE LI~ /UIE IIITCB) , , i J Y, S912412.37 N- 7105324.5X 7~21'~0.0670' 14~17'Ze.4~e' 1921.44 x- 2~9~B0,~ E- 2 Y- ~982~79.8B N- 780~3.~2 70~21'10.9B14· 147°57'24.6257' "1B3~.43 2~6S.94 X- 2~904~.49 E- 464094.4~ i ~ Y- ~gg~474.2g N- 780~2.9g 70~2~'09.9~46' ~47~7'20.62~B' ~9~6.77 ,X= 2~917~ 01 E= 4~4135 65 4 Y= 59~2571.~9 'N= 7B05350.99 70°21'10.~91" 147~57'24.7~5&" 1843.~0:2~74.41 X= 259035,76 E= 464092 74 5 Y= 5982465.99 N= 78053i9.4~ 70~21'09.9023" ~47c57'20.7~57" 19~~~3~,~ X= 259169,27 E= 464133,95 & Y- 59B2563.50 N- 780534B.47 70°21'10.816B" 147°~7'2e.9454' IB~2.17~ 2~79.BB X- 259030,02 E- 464091,04 7 Y- ~9824~7,80 N- 78053~6.94 70o2X'09,8200" ~47°57'20,9455" ~9~3,52 2043,06 X- 2~9163,~4 E- 464~32,24 B Y- ~982~55,30 N- 7805345,94 70°2~'10,7344" ~47°~7'25,~0~3" 1860,~4 218~,3~ X- 259024,29 E- 464089,33 9 Y- ~gB244~'&I N- 78053~4.4: 70°2~'09,7376" 147°~7'21,19~4" 1961,19 2048,53 X- 2~9~7,,0 [- 464130,53 ~0 Y- 5982547,~1 N- 7B0~343,42 70o2~'~0,652~" ~47°~7'2~,26~" IB6B,91 2190,B3 X- 2~9018,55 E- 464.087,62 ~ Y- ~982441,42 N- 78053~1.B9 70°21'09',65~3" ~47°57'21,2653" 1970,26 2054,0'0 X- 2591~2,07 E- 464~28,B3 12 Y- ~9B2~38.92 N- 7805340,90 70°2~'~0,~697" ~47°~7'2~,4250" 1177,21 2196,30 X- 2590~2,B2 E- 464085.92 ~3 Y- ~982433.23 N- 7B05309.36 70~2~'09,57~0" 147°~7'2~,425]" 1978.63 2059,47 X- 2~9146,33 E- 464~27,[2 14 Y- ~982530.73 N- 7805338.37 70°2X'10,4874" ~47°~7'25,~B49" ~B85,66 220Z,77 t~ Y- ~98242~.03 N- 780~306.B4 70c2~'09.4906· ~47cS7'2~.~B~0· ~9B7.00 2064.94 X- 2~9X40,60 E- 464~2~.42 ~6 Y- ~9B2~22.~4 Nm 780~33~.8~ 70°2~'~0.40~· ~47°57'2~.7447· ~194.03 2207.24 X- 2S900X.3~ E- 4640B2.~0 ~7 Y- 59B24~6.B4 N- 7B05304.3~ 70o2:'09.40B3· ~47~57'2~.7449· ~99~.3B X- 2~9~34,.6 E- 464~23.7X lB Y" S982514,3~ N' 7B05333.32 70°21'10,3227" ~47°57'2~,904&" 1902,40 2212,7~ X" 2~899~,61 E' 464080,80 ,, 19 Y- 5982408,65 N- 780~301.79 70c21'09,3260" 147o57'21,9047" 2003,7~ 207~,B9 X- 2~9129,13 E- 464122,00 20 Y- ~982506,16 N- 7805330,B0 70021'10,2404" 147°57'26,0644" 1910,77 221B,18 X- 2~8989.87 E- 464079,09 21 Y- 5982400.46 N- 780~299.27 70o21'09,2436· 147oS7'22',0&4&" ' 2012,12 2081,36 X- 2~9123,39. E- 464120,30 ,, MPI PRO~SED WELL L~ATION LIST ·~ ~,f~ .... LOCATED IN SEC. 3$'~T. 12N.~R.ISE. UMIAT M. ,o, ~, ' ~1~_ ,~~ DRW. NO. 116-85 PREPARED BY DATE'NOV. 13, 1985 h ~'""~-~ F.R BELL B ASSOC ~k~FESSi~k~~ SHEET 3 of IO ' · SCALE: N/A -~%~~ P RU DHOE BAY OFFICE DRAWN BY: RG.T REV. O PRUDHOE BAY~ALASKA CHECKED BY: B.E. i i i ii Ii ii I I i] i i I I II :2 V-mV12497,~7 I1,,, 710S32i.27 70G~i'10'ISII· 147oS7'2&.2~$· I- 3SI914.14 E* 464077.31 23 Y- 5'~'B2392.27 N, 7B05296.74 70o~1'09.'i613· 147057'22.2244· 2020.49 20B6.13 X- 259117.65 E' 464118.59 24 Y- 5982489.77 N' 7B0532~.75 70c21~10,07~7' 147057'26.3842' 1927.53 2229.13 .... · l~.X' 259111.92 E- 464116.88~ . 26 ~Y- ~gB~481.~8 : N- 780~323,23 '70~21'09.9934' 147c~7'26,5440' 193~.90 ~ 2234.60 ,X- 2~8972,67 . E, 464073.97 ~ .... 27 TY' ~98237~,89 N' 7805291.69 ~70~21'08,9966' 1470 57 ' 22, 5442' 2037,24 : 2097,77 X' 259~06,[8 E~ 4641~5,~8 2B Y- ~982473~"39 N- 7805320,70 70°21'09,9111· ~47o57'2&,7039' ~944,27 2240,07 X- 2~8966,93 E- 464072.27 ..... 29 Y- 5982367','70 N' 780~289,17 70o21'08,9143· 1470 57 ' 22, 7040' 2045.&1 2103,24 X~ 2~9100,4~ E· 464Z~3,47 .... 30 Y- ~982465,20 N- 7BO531B,18 70o2~'09,12B7' 147°57'26,8&37' ~952,&4 2245,54 X- 2~8961,20 E- 464070,56 31 Y- 5982359,50 N- 7B05286,&5 70~2~'08,1320· '~47057'22,B&39' 2053,9B 2~01,72 X- 259094,71 E- 4641~l,76 32 Y- 5982457;01 N- 780~315,6~ j70021'09.74&4" 147o57'27,0236" 19&l,01 2251,01 X- 2~895~,46 E- 464068.8~ . 33 Y- 59823~1,31 N- 7805284,12J 70~21'0B 7496" ~47o57'23,0237· 2062,35 ~2114,19 X- 2~908B.98 E- 4641~0,06, 34 Y- 598244B.82 N= 7805313,13 70c21'09,&641" i47~57'27.i'B34" 19&9,38 22~6,49 X- 258949,73 E- 464067,1~ 35 Y- ~982318~ N' 780~274,02 70°21'0B,4~03" 1470~7'23.6632" 209~,B4 2136,07 X- 2~9066,03 E- 464103,23 36 Y- ~982416,0~ N- 780~303.03 70°21'09,3347' 147c57'27,B229' 2002.B7 227B,37 X- 2~8926.78 E- 464060.32 37 Y- 5982310~36 N- 7805271.50 70o21'0B.3379' 147°57'23,B230' 2104.21 2141,55 X= 2~9060,30 E~ 464101,~3 38 Y- 5982407,~6 N' 7805300.51 70o21'09.2~24· 147°57'27,9127" 2011,24 2263. B4 X- 2~8921.0~ E- 4640~8,6l ,_ 39 Y" ~9B2302,17 N" 7B05268,98 70°21'0B,255~" 1470~7'23,9129" 2112,5B 2147,02 X" 2~90~4,56 E" 464099,B2 40 Y' ~82399~'~7 N" 7B05297,98 70°21'09,1700" 147~57'2B,1426" 2019,&2 22~9,31 X' 258915,31 E' 4640~6.91 41 Y" ~982293,97 N' 7805266.4~ 70o21'08,1733" 147°57'24,1427" 2120.9~ 2152,49' X" 2~9048.83 E' 464098,1 42 Y' 59B2391,'48 N' 7B0~295.46 70021'09,0877" 147057'28,3024" 2027.99 2294.79 X" 2~8909.~8 E" 46405~.20 iii MP! PR SED WELL L ATION LIST ~ ~ AC ~t LOCATED IN SEC. ~6, T. 12N., R. 16 E. UMIAT M. e~k~S~kL~~ SHEET 4 of IO F.R. BELL & ASSOC. SCALE: N/A ~~~ PRUDHOE BAY O~CE DRAWN IY: R.G.~ -'.. REV. 0 PRUDHOE BAY, ~ASKA CHECKED i i iii i i iii ....4:3 Y- 1912215', 71 N" 71052&:3,'9:3' 70¢2'1''i)1,0909°'' 14~17~24',$0~&"' ~lPo~ X- '2'~9043.09 E- 464096.41 44 y, 59B2383.29 N'"7805292.93 70c21'09.'0054, 147o57"2B.462~· 2636'.36 2300.26 X- 2~8905,84 E- 4640~55.50 · 4~ ~'~i~2~77.~,, N= 7~0-~-~-2-.'-40 70:2~ 0E~.00E~6 ', ~'47~7 24.4625 .... ;" ~i-~7'.-'70 I X- 2~0~t.62E- 4640~2.'~'~ ! I 48 Y- 5,~2366.91 N- 7B'i)52e?.BgiT0O21'OB'E~407" 147~57'2B".TB2o" : 205].~0 2311.20 x· 2~e~'~2.37 £- 4640~0.0e "49 Y-5';0226~.2~ N-7e05256.3~ 70o21'07.e439" ~47°57'24.7B22· 2154'.44 2~74.3B X- 2~902~5,B9 E- 464091,29 50 Y· 598235B,71 N- 780~2EI5,36"' 70o21'08,75B4· 147°57'28.941B· 2061.47 "2316'67~ X· 258BB6.63 E- 464048.38 5t' Y- 5982253.O2 '"N- 7B~),,525~.'83'70G21'07.76~6· t47o57~24.9420· 216~.11 2179.B6 X- 259020.15 E- 464089.58 52 Y- 5982350.52 N- 7B05282.84 70c21'08:'6760" 147o57'29.1i)17· 2069.8~5 2322,14 x- 25eeeo.90 [- 464046.67 5~ Y- 5~82244.i~'3 H- 7805252.32 70~21'07.67~3" 147o57'25. t019· 217[.19 2ta5.33 x- 259o14.41 E- 464087,81] 54 Y- S~82342.33 N-"'7805280.31 ?0o~'08.5<~37· 147o57'29.2615· 2078,22 2327.62 X- 2,"58875. t6 E· 464044.96 Ss Y- 5~82236,64 'N-"TB0S24B.T8 70c2t'07';5c~6c~· ~47457'25,2617· 2179.56 2190.80 X- 2S~00B.61~ E- 464086.17 56 Y- 5~82334,14 N- 7805277.79 70~21'08.5t13· ~4~57'29.4214· ~0B6.59 2333.09 X- 258869.43 E- 464043.26 57 Y- 5~O222B,44 N, 7805246.26 70o2~'07,5~46" 147o57'25,4216· 21B7.93 '2196.27 X- 259002.94 E- 464084,46 58 Y- 5982325~95 N- 7805275.27 70°21'08.4290" 147°57'29.5112" :~'094.96 2338.56 X- 258863.69 E- 464041.55 59 Y- 5982220.25 N- 7805243.73' 70o21~"07.4323" 147~57'2'~.51l4" :~196.30" 2201.74 X- 258997.21 E" 464082.76 6'~ Y- 59823~7.76 "'N- 7805272.74 70o"21"0B'3467" 147°57'29.7411" 2103.33 2344~03 X- 258857.96 E- 464039.85 61 Y- 5982212.06 N- 7805241.21 70o21'07'"34'99" 147o57'25.7'41:3" 2204.&7 2207.21 X- 2~58991.47 E- 464081.05 62 y· 5982309.5'7. N- 7805270.22''70c21'0B.26"43~ 147057'29.9009" :2111.71 23'49.50 X- 25~852.22 E- 464038.t4 63 Y- 5982203.B7 N""78052:38.69 70021'07.2676"'''~47°57'25,9'011" :~213.05 22~2.69 X- 25BgBS.74 E- 464079.34 ........... · · II i II iiii i i iii ii ii ..,~,_~__~,~_~.. ., MPI PROPOSED WELL LOCATION LIST ..._~L-- of 4/.:,~ LOC,~TEo ,, s~c. ~ T.,Z.. ,. ,~;~ U~,,AT ~,. _~'~* 9 · ;dr I. PREPARED FOR SOHIO ALASKA P£TROLEUId CO. t&.-*~,~-eek//_2,.,,~.a~r~;~.__~ DRW. NO. 116- 85 PREPARED BY DATE: NOV.I$, "&~k~.~'£YSK~k~-~---,.? SHEET 5of IO F.R. BELL & A$$OC. SCALE' N/A ~%,~,~,,,i.q.~,,~r' - PRUDHOE BAY OFFICE PRUDHOE BAY. ALASKA DRAWN BY : R.G.*~ _ REV. O ~:-,, ..... ~,CHECKEO BY: I.E. ii iiii I i ii iii iii I _ i ...... .....-~ ~ ? ' I I I ,ii ill! L III IIELL IbBP ZONE $ IT. u~l & LATITUIE LO. .tUll '" Jilt 14 ~-Y' 091230Z'~i N-71052&7,*~ 7F2i~01,1120' i47~S7'30,0i01' ~i2o.ee J3S4.97 xm 2SIB4&~41 E- 4&403&.43 b~ Y- ~98219~.6B N- 780~2~6,26 70~21'07,18~2' 147°S7'26,0&10' 222i.43 X" 258980.00 E" 464077,&4 X- 2~840.7~ E- 4640~4.7~ ~ 67 Y ~9B22~7~-~9- .... H~-~80~2~'~-6~-~'-~'0-F2~z~-7-~-2-0--29~'~'-147-~7'26,2208' ~ 2229 80 ~ 2~23.6~ X~ 2~8974.26~ E' 46407~.9~ I I / 68 Y- ~982284,99 N- 780~262.64 ~ 70:'2~'0B.0~7~" ', ~47~7'~0.380~" 2~6 82 , 2~6~.92 X- 2~88~.01, E- 4640~,02 a9 '~ Y- 5982179.30j N- 7B0~231,11 70021'07.0206, ~47057'2,.3B07' 2238.17 2229,10 X~ 258968.~3~ Ea 464074.23 70 Ye 5982276.10 i N- 7B05260.12 70o2~'07.9350', ~47°57'30.5403' 2145.19 2371.39 X- 258829.28 E- 464031.3~ ! II I MPI PRO~SED WE~ L~ATION LIST ~ R. I6 [. UMIAT M -- OF 4 ~ LOCATED IN SEC. ~e;Z. 12N., . · ~--,,. -~~ F.R BELL & ASSOC ~ ~ ~.~ ~ SHE ET 6 of I0 · · SC~E: N/A ~k~_~ss,~~~ pR UDHOE BAY OFFICE e~. o PRUOHOE BAY, ALASKA ORAWN ................. CHECKED BY: B.E. I Search Radius= 200 7 DEGREE LEAD LINE For proposed well: 1-69/V-19 [42- 2-11-16] Location = W-E S-N TVD(SBS) Top 258969.00 5982179.00 -56.00 Bottom 255350.64 5976841.04 10600.00 Note: All depths in feet Below Kelly Bushing (BKB) --- Closest Approach Analysis Date: 9-FEB-90 Time: 15:17:14 WELL IDENT Closest Approach /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A000-0000083 MI-33 NO COORDINATE POINTS A000-0000119 ~I-69 NO COORDINATE POINTS A000-0000120 MI-70 NO COORDINATE POINTS A029-2024500 ~I-SD4 NO COORDINATE POINTS A029-2064000 ~ISD10 NO COORDINATE POINTS A029-2160500 MI-O20 1600.6 0.0 A029-2162500 MI-Q2i 2896.2 26.8 A029-2164800 ~I-Q17 A029-2166900 MI-~25 A029-2167200 MI-O25 A029-2169300 MI-P20 A029-2171300 MI-O23 A029-2172200 MI-N22 A029-2174800 MI-P24 A029-2175000 MI-SI4 A029-2178800 ~I-R25 A029-2182700 MI-P17 A029-2184100 MI-P21 A029-2184700 MI-P19 A029-2185800 ~I-S17 A029-2186400 ~I-P26 A029-2187300 }~I-R23 A029-2!89900 ~I-Ui5 A029-2190500 800 9 2550 0 1900 9 2550 0 2000 8 900 7 500 3 2201 0 2550 0 1488 9 2500 7 2550 0 2650 0 735 6 0 9 .2739 3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 CLOSEST DISTANCE WITHIN WITHIN WITHIN WITHIN WITHIN SPECIFIED SEARCH WINDOW SPECIFIED SEARCH WINDOW SPECIFIED SEARCH WINDOW SPECIFIED SEARCH WINDOW SPECIFIED SEARCH WINDOW 18.3 331.8 135.4 19.3 1599.9 2895.6 800.0 2549.6 1899.9 2549.6 2000.0 900 0 499 8 2200 2549 1488 2499 2551 2649 734 0 2791 1 4 5 2 15 7 18 4 6 5 1 8 8 4 4 8 10 9 32 1 12.7 33.8 14.0 24.1 0.0 20.2 174.2 225.7 161.1 220.8 132.5 248.8 156.4 189.7 63.4 147.9 91 6 284 7 159 3 128 4 59 6 154 0 Vertical /PROPOSED~ TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 3133.9 75.8 3933.4 185.7 800.4 3409.0 167.5 5873.5 277.3 2465.4 MI-T22 786.3 0.0 785.5 A029-2192100 MI-Q15 500.9 0.0 500.0 A029--2198500 MI-T20 1083.9 0.0 1083.0 SUMMARY The well which comes closest to the proposed well is: A029-2198500 MI-T20 Closest approach distance = 8.6 feet KICK OFF for this run = 2550.0 feet 23.0 1.3 2.8 20.3 207.2 8.6 Closest Approach Analysis Date: 9-FEB-90 Time: 15:16:21 Search Radius= 200 CCURSE LINE For proposed well: 1-69/V-i9 [42- 2-11-16] Location = W-E S-N TVD(SBS) Top 258969.00 5982179.00 -56.00 Bottom 254727.08 5977321.79 10600.00 Note: All depths in feet Below Kelly Bushing (BKB) Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE A000--0000083 MI--33 A000--0000119 MI--69 A000--0000120 MI--70 A029--2024500 MI--SD4 A029--2064000 MISD10 A029--2160500 MI--O20 A029--2162500 ~I-Q21 A029--2164800 MI-Q17 A029--2166900 MI--~25 A029--2167200 MI--O25 A029--2169300 ~I--P20 A029-2171300 MI--O23 A029--2172200 MI-N22 A029-2174800 MI--P24 A029--2175000 MI--S14 A029--2178800 MI--R25 A029--2182700 MI--P17 A029--2184100 MI--P21 A029-2184700 ~I-P19 A029-2185500 ~I-S17 A029-2186400 ~I-P26 A029-2187300 ~II-R23 A029-2189900 >II-Ui5 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 1600.6 0.0 1599.9 18.3 331.8 2862.7 21.7 2862.1 133.6 22.3 800.9 2550 0 1900 9 2550 0 2000 8 900 7 500 3 2201 0 2550 0 1488 9 250O 7 2550 0 2756 6 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 0 0 0 0 0 0 0 9 5 800 0 2549 6 1899 9 2549 6 2000 0 900 0 499 8 2200 0 2549.0 1488.0 2499.7 2551.1 2756.3 1.4 5 2 15 7 18 4 6 5 1 8 8 4 4 8 10 9 32 1 12 7 33 8 15 5 174.2 225.7 161.1 220.8 132.5 248.8 156.4 189.7 63.4 147.9 91 .6 284.7 158 .5 735.6 3 . 9 2°~69 . 2 0.0 0.0 22.7 734.5 0.0 2871.0 24 .1 0.0 21.7 128.4 59.6 i51 .7 Vertical Intersection /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE 4540.8 996.3 6916.5 1002.6 2377.2 5958.3 2260.2 8951.8 2258.3 2995.1 3253.8 111.0 4739.5 220.6 1486.5 3369.6 152.1 5691.0 261.6 2322.3 A029-2190500 MI-T22 786.3 0.0 785.5 A029-2192100 MI-Q15 500.9 0.0 500.0 A029-2198500 MI-T20 1083.9 0.0 1083.0 SUMMARY The well which comes closest to the proposed well is: A029-2198500 MI-T20 Closest approach distance = 8.6 feet KICK OFF for this run = 2550.0 feet 23.0 1.3 2.8 20.3 207.2 8.6 Interval ENDICOTT MUD PROGRAM MAIN PRODU(~TIQN ISLAND WELL 1-69/V-19 Mud Weight Viscosity . Fluid Loss (ppg) (sec/qt) (ml/30min) 0-2500 8.8-9.8 100-200 20- 15 9.0-9.5 2,500- 11,414 11,414- 13,036 Set 13-3/8" casing 9.2-10.2 40-45 15-16 9.0-10.5 Set 9-5/8" casing 9.6-10.2 40-45 6-8 9.0-11.0 Hang 7" Liner Mud Type/ Components Generic Mud #5 Seawater Fresh water Gel Soda Ash Generic Mud #7 Seawater Fresh water Gel Caustic Soda Soda Ash Barite Lignosulfonate Drispac Lignite Newdrill Generic Mud #7 Seawater Fresh water Gel Caustic Soda Soda Ash Barite Lignosulfonate Drispac Lignite Newdrill JT.. - PL,AAI WE. hl- 1.~. VE.L_~,_ OaECCl LTl] ~/,o~ (4031 468.1550 , --", IF IN DOUBT . . - ASKII .... Ill II .... r J I __ Ill ..... A, ftX ~K l~r ~££ o': ~,J/D J i ' J E ~ o~ tz:o" I t/:.o' J il'-& ' II :D ' _0_9'-0' ' .7 J /Z :~' I? I t. I 1 ! i I O' I i I I I : DOYON DRILLIN6~ INC. RI 6 NO. 15 MUD AND SOL!DS CONTROL' EQUIPMENT Equipment Hanufacturer Nominal Model Capacity Shaker Desander Mu dcl can er s Cen tri fuge Brandt Dual Double Demco 2-12" cones Tri Flow Double 8 each - 4" cones 1000 9pm 700 9pm (each) 400 9pm (each) Pioneer Mark II, 150 9pm Decant i n 9 Degasser Driico Agi tarots Brandt Geosource Vacuum 1000 9pm 8 each - 25 h.p. Hoppers Dual Sidewinders 1000 9pm The trip tank and mud tank sections have one vertical pit level float indicator which are connected to the drillin9 recorder system that contains visual and audio warnin~ devices located in the drillerts console. LJ I. ,I 1B-5/8" API-5000, 13-5/8"' API-3000, CONTROL LINE-- 13-B/8" 9-5/8" --CONTROL LINE 4-1/2~' WELLHEAD ASSEMBLY.ENDICOTT SKSi 13-3/8"x 9-5/8'"x SOHIO ALASKA PETROLEUM COMPANY F ICURK I (3) ., II. 3. 9-5/8' CASING AND WELLHEAD EQUIPMENT 3.1 TESTING B.O.P. STACK I. After B.O.P.'s are nippled up to split speedhead, make up 13" x 4-I/2 Internal ~'lush g.O.P, test plug, Accessories Item 7, Part No. 538116. 2. Lower plug into head (it will land on lower step). Tighten 4 lockscrews 90° apart. 3. After B.O.P. test, back out lockscrews and retrieve test plu~. CAUTION: It is very important not to have the lockscrews protruding into the bore of the head while either running or pulling the B.O.P. test plug. Always check them if in doubt. (29) SPL I T SPEEOHEAO TEST PLUG (3o) 13-3/8" 0.0. CASING ACCESSORIES ITEM 6 /t,,-V?.IF ~E-~LE THO I! tt II II Ii 11 Ii I1 II il ( 21.0 BOP TEST PLUG F3~ (JPPE'_RBOWL (5381:71 ACCESSORI ES ITEM 7 t2. gB 0~A F~.-~/'2 IF FEHALE f~O I! I! ¥ 210 i ._. 2c C, ta ~ II. 4. 4-1/2 TUBING AND WELLHEAD EQUIPMENT 4.1 TESTING B.O.P.'s 1. After 9-5/8" has been set and tested, run £n B.O.P. test pluM, Accessory Item 6, Part Number 538117, wh£ch lands in upper bowl of the split speedhead. Run in 4 lockscrews lightly, 90° apart to keep plu~ from moving. 2. After test, retract lockscrews and pull plu~. 3. Run in short bowl protector, Accessory Item 8, Part Number 538114, using the same running tool, Accessory Item 5, Part Number 538115, that was used for the long protector. 4. After bowl protector is in place, run in 4 lockscrews lightly to hold protector in place. CAUTION: Upper lockscrews must be retracted when the bowl protector or B.O.P. test plug is either run or pulled. TEST PLUG --PACKING PORT TEST .PORT LOCKSCREW I 3 - 3/8 / 9--5/8 CASING HANGER SPLIT SPEEDHEAD Telecopy No. (907) 276-7542 February 12, 1990 T N Tyler, Manager Endicott Development BP Exploration (Alaska) P O Box 196612 Anchorage, AK 99519-6612 Re: Endicott Uphole Logging Requirements - Well V-19 Dear Mr Tyler: This is in response to your written request of 1/31/90 for a waiver of uphoIe logging requirements for Duck Island Unit well 1-68/V-i9. Following a review of available information pertinent to your request, the Comanission concludes that acquiring uphole logs in well V-19 would largely be redundant with those just acquired in well T-20. Additional uphole data in well V-19 would not significantly add to existing knowledge of the field with respect to stratigraphy or fluid distribution. The Co~ission authorizes the waiver of uphole logging requirements for well V-19. This action does not exempt future wells drilled into Section 2, TllN, R16E, UPM from logging requirements previously specified. S.~ ~ce~ely,ia~ r Chairman BY O~ER OF THE CO~MISSION jo/B.RPC. 29 BP EXPLORATION January 31, 1990 Commissioner Chat Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' Endicott UDhole Loaaina Reauirements -- -- -- Dear Mr. Chatterton' BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-1~2 In July, 1985, BPX was granted a waiver for uphole logging requirements at Endicott. It was acknowledged by BPX and the State of Alaska that acquiring uphole log data in wells drilled radially from existing development islands would result in overlaping and redundant data. At that time, it was agreed BPX would acquire uphole logs in sections 1 and 2, T11N - R16E UPM, and other sections within the field. Well 1-67/T-20 was drilled and completed in December, 1989, and a full uphole logging suite was acquired. BPX is currently planning well 1-68/V-19 as a subzone 3B/3C water injector with a bottom hole target location 1640' SNL, 780' WEL in Section 2 T11N, R16E UPM. Well 1-68/V-19 has a planned bottom hole location approximately 2500' from T-20 and will be drilled from the adjacent surface slot on the MPI. We anticipate well V-19 spudding about mid- March 1990. Due to the nature of subzone 3B/3C extension development at Endicott, it is uncertain whether additional wells will be drilled in Section 2. Future peripheral well targets are contingent on the outcome of V-19. In our view, acquiring uphole logs in V-19 would be redundant with those just acquired in T-20. Additional uphole data in V-19 would not add to our existing knowledge of the field with respect to stratigraphy or fluid distribution. We therefore, request the Commission waive requirements for uphole logging on well 1-68N-19 in Section 2 T11N, R16E. Your consideration in this matter is greatly appreciated. Please contact Bob Metzger at 564-4613 if your staff requires further information to evaluate this request. Sincerely, T. N. Tyler Manager Endicott Development 1361/RRM RECEIVED ¥ EB 0 7 lC3 .~,.ts~a Oil & Gas Cons. Anchor~J8 CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (2) Loc ,, PP(' . 3. 4. 5. 6. 7. 8. (8) (3) Admin//~( ~ 9. (9 thru 10. (10 and 13) 12. 13. (4) Cas~ (14 thru 22) (5) (23 thru 28) ' ~29 th (6) OTHER (6) Add: Geology: Engi~neerin~: _u i' cs rev: 01/30/89 6.011 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27 28. For 29. 30. 31. 32. Company Z~2P Lease & Well No. /Z/z~z~ ~ ~/~'y~' YES NO REMA~S - Is the permit fee attached .......................................... Is well to be located in a defined pool ............................. Is we/] located proper distance from prop&rty line .................. Is we~,l located proper distance from other wells .................... Is suzfiCient undedicated acreage available in this pool ...... ...... / 7- Is well to be deviated and is wellbore plat included ................ j ~-- Is operator the only affected party ...................... Can permit be approved before fifteen-day wait ........... ' .......... / 9-- · e · · e · e e e e e Does operator have a bond in force .................................. 7~ Is a conservation order needed ....................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Is enough cement used to circulate on conductor and surface ......... ~ Will cement tie in surface and intermediate or production strings ... ~ Will cement cover all known productive horizons ..................... ~ Will all casing give adequate safety in collapse, tension and burst.. ~ Is this well to be kicked off from an existing wellbore ............. ~ Is old wellbore abandonment procedure included on 10-403 .. ........... Is adequate wellbore separation proposed ............................ /A~ Is a diverter system required ....................................... ~ Is the drilling fluid program schematic and list of equipment adequate ~ Are necessary diagrams and descriptions of ~jmc_r~r .--' BOPE attached. ~ Does BOPE have sufficient pressure rating - Test to~mo~/~oompsig .. ,4~ Does the choke manifold comply w/AP1 RP-53 (May 84) '/--. . . Is the presence of H2S gas probable ................................. ~ exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented ,. Additional requirements ............................................. /~ Additional Remarks: . / 790 '~ O ~Z