Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-212 T R A N S M I T T A LL
FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl
ConocoPhillips Alaska, Inc. AOGCC
P.O. Box 100360 330 W. 7
th Ave., Suite 100
Anchorage AK 99510-0360 Anchorage, Alaska 99501
RE: Schlumberger Wireline Backlog – CRU
DATE: 12/19/2023
Transmitted:
North Slope, Colville River Unit
Colville
CD1-01A 50-103-20299-01
212099_CD1-01A_PERF_23Jul22
212099_CD1-01A_WFL_23May2022
CD1-04 50-103-20346-00
200117_CD1-04_PLUG_27Aug2022
CD1-33 50-103-20357-00
222105_CD1-33_Puncher_21Sep2022
CD1-48A 50-103-20592-01
212004_CD1-48A_LDL_28Jul2022
CD2-02 50-103-20513-00
205109_CD2-02_LDL_11Oct2022
205109_CD2-02_LDL_12Jul2022
205109_CD2-02_Patch_07Nov2022
205109_CD2-02_PLUG_23Aug2022
CD2-15 50-103-20386-00
201159_CD2-15_LDL_06Oct23
CD2-310 50-103-20826-00
220028_CD2-310_DHSIT_10Aug2022
220028_CD2-310_USIT_25Apr2022
CD2-404 50-103-20530-00
206054_CD2-404_Patch_30Dec2021
Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com
Receipt: Date:
Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512
T38291
T38292
T38293
T38294
T38295
T39296
T38297
T38734
200-212
CD1-33 50-103-20357-00
222105_CD1-33_Puncher_21Sep2022
Meredith Guhl Digitally signed by Meredith Guhl
Date: 2024.04.23 11:54:09 -08'00'
1a. Well Status:Oil SPLUG Other Abandoned Suspended
1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: _______1__________ Service Stratigraphic Test
2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry:
Aband.:
3. Address: 7. Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number:
Surface:
Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s):
GL: BF:
Total Depth: 4645' FNL, 2472 FWL, Sec 5, T11N, R5E 10. Plug Back Depth MD/TVD: 18. Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
Surface: x- y- Zone- 4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050 N/A (ft MSL)
22. Logs Obtained:
23.
BOTTOM
16" H-40 114'
9-5/8" J-55 2376'
7" L-80 8701'
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr):
Press. 24-Hour Rate
3892-3923 30 bbls of 15.8 C;ass G
3028-3070 21 bbls of 15.8 Class G
2730-2800 25 bbls of 15.8 Class G
40'
2376
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date perf'd or liner run):
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
CASING, LINER AND CEMENTING RECORD
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
TUBING RECORD
130 sx Class G6"
7654'4.5"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
ConocoPhillips Alaska, Inc.
WAG
Gas
11/23/2022 200-212/ 322-459, 321-426, 322-456
50-103-20357-00-00
CRU CD1-33
ADL0025559
97-007
11/14/2022
10854' MD/7059'TVD
10854' MD/7059'TVD
37
P.O. Box 100360 Anchorage, AK 99510-0360
385773 5975677
1948 FNL, 1047 FWL, Sec 5, T11N, R5E
CASING WT. PER
FT.GRADE
11/15/2022
CEMENTING RECORD
5974202
804'MD/806'TVD
SETTING DEPTH TVD
5971484
TOP HOLE SIZE AMOUNT
PULLED
384454
385846
TOP
SETTING DEPTH MD
suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud
log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing
collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary.
N/A
Coville River Field/ Alpine Oil Pool
453' FNL, 2348' FWL, Sec 5, T11N, R5E
2418' MD/2417'TVD
BOTTOM
40'
114
Per 20 AAC 25.283 (i)(2) attach electronic information
29 7039
62.58
36
114'
40' 7878
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
20"
8-3/4"
10 cu yds Type 3
2375' 365 sx AS II & 232 sx Class G
Flow Tubing
5994-7658
2060-2488
2730'MD/2729'TVD to 2772'MD/2771'TVD CMT SQZ
3028'MD/3027'TVD to 3070MD'/3069'TVD CMT SQZ
3892'MD/3888'TVD to 3923'MD/3919'TVD CMT SQZ
4100'MD/4090'TVD to 4110'MD/4099'TVD CMT SQZ
Gas-Oil Ratio:
4100-4110 20 bbls of 15.8 Class G
3216-3988 30 bbls of 15.8 C;ass G
2800-3118 21 bbls of 15.8 Class G
Choke Size:
32.5 bbls of 17.00 C;ass G
Sr Res EngSr Pet GeoSr Pet Eng
N/A
Oil-Bbl: Water-Bbl:
7597'MD/6981' TVD
1bbl of 15.8 Class G
5994-8000 109bbls of 15.8 Class G
Water-Bbl:
PRODUCTION TEST
N/A
Date of Test: Oil-Bbl:
Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment
By James Brooks at 1:17 pm, Dec 22, 2022
Abandoned
11/23/2022
JSB
RBDMS JSB 122722
xGDSR-1//3/23
Conventional Core(s): Yes No Sidewall Cores:
30.
MD TVD
Surface Surface
804 806
7798 7033
10854 7059
(Alpine C)
31. List of Attachments:
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name: Jenna Taylor
Digital Signature with Date:Contact Email:jenna.l.taylor@conocophillips.com
Contact Phone:907-263-4522
General:
Item 1a:
Item 1b:
Item 4b:
Item 9:
Item 15:
Item 19:
Item 20:
Item 22:
Item 23:
Item 24:
Item 27:
Item 28:
Item 30:
Item 31:
Yes No
Well tested? Yes No
28. CORE DATA
If Yes, list intervals and formations tested, briefly summarizing test results for
each. Attach separate pages if needed and submit detailed test info including
reports and Excel or ASCII tables per 20 AAC 25.071.
NAME
Permafrost - Top
Permafrost - Base
If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if
needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired.
29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion,
suspension, or abandonment; or 90 days after log acquisition, whichever occurs first.
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic
diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from
a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core
analysis, paleontological report, production or well test results, per 20 AAC 25.070.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Formation Name at TD:
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
TPI (Top of Producing Interval).
Authorized Name and
INSTRUCTIONS
Top of Productive Interval
(Alpine D)
Authorized Title: Senior Wells Analyst
Direction Survey, Operations Summary, Cementing Summary, Well Schematic
Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Digitally signed by Jenna Taylor
DN: CN=Jenna Taylor, E=jenna.l.taylor@conocophillips.com
Reason: I am the author of this document
Location:
Date: 2022.12.22 12:43:20-09'00'
Foxit PDF Editor Version: 12.0.1Jenna Taylor
17 ppg
Kick Off Plug
15.8 ppg
Balanced
Plug &
Squeeze #1
15.8 ppg
Balanced
Plug &
Squeeze #2
Tubing Cut @ 4415' MD / 4384' TVD
4-1/2" 12.6# L-80 IBT-M
10/10/2022 JJL
CD1-33 Rig Abandonment P&A
RKB = 58.5' AMSL
16" 62.58 ppf H-40 Insulated Conductor
114' MD/ TVD - Cemented to surface
Surface Casing
9-5/8" 36# J-55 BTC-M | Set @ 2376' MD / TVD
15.8 ppg
Class “G”
Squeeze
6-1/8” Production Hole Section
Open Hole Completion
TD @ 10854' MD / 7059' TVD
7” 26# L-80 BTC-M
7884' MD / 7046' TVD
ISOLATION PLUG
TOC Kick-off Plug @ 2176' MD/ TVD
Cement Plug @ 5944' MD / 5676' TVD
CIBP @ 4223' MD / 4206' TVD
Perfs @ 4100' MD / 4090' TVD to 4110' MD / 4099' TVD
CMT Retainer @ 4048' MD / 4040' TVDTop Qannik
4046' MD / 4038' TVD
Base Qannik
4073' MD / 4064' TVD
Tag & Test 1500 psi (GOOD) @ 3216' MD / 3215' TVD
Perfs @ 3892' MD / 3888' TVD to 3923' MD / 3919' TVD
Tag & Test 1500 psi (GOOD) @ 3988' MD / 3982' TVD
CIBP @ 3118' MD / 3117' TVD
Perfs @ 3028' MD / 3027' TVD to 3068' MD / 3067' TVD
Base Halo
3058' MD / 3057' TVD
Top Halo
3038' MD / 3037' TVD
15.8 ppg
Balanced
Plug &
Squeeze #3 Perfs @ 2730' MD / 2729' TVD to 2770' MD / 2769' TVD
Top Plug #2 @ 2800' MD / 2799' TVD
Tag & Test 1500 psi (GOOD) @ 2675' MD / TVD
Casing Cut #1 @ 2635' MD / TVD
Casing Cut #2 @ 2363' MD / TVD
Casing Cut #3 @ 2490' MD / TVD
Page 1/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/18/2022
00:00
9/18/2022
06:00
6.00 MIRU, MOVE MOB P CON'T WITH CLEANING OF WIND
WALLS AND DERRICK, FINISH
PREPPING 5" DERRICK
FINGERS FOR INSPECTION, HOUSE
KEEPING AS NEEDED, COMBINE ALL
USED OIL AND
DIESEL, PREP FOR REMOVAL
0.0 0.0
9/18/2022
06:00
9/18/2022
12:00
6.00 MIRU, MOVE MOB P CONT. PRESSURE WASHING IN
DERRICK. FLUSH MUD PUMPS, MUD
LINES AND MPD
CHOKE SKID WITH DEEP CLEAN
PILL. FLUSH POP OFF VALVES.
REMOVE RIG FLOOR STEAM
HEATER HOSE AND SEND OUT FOR
REPAIR. CONT. PREPPING 5"
DERRICK FINGERS FOR
TUBO. REMOVE 5 1/2' LINERS AND
PREP FOR 6" LINERS ON CD1. PAINT
TANK FARM PUMP
HOUSE. HOUSEKEEPING IN
ROCKWASHER.
0.0 0.0
9/18/2022
12:00
9/18/2022
18:00
6.00 MIRU, MOVE MOB P CONT. PRESSURE WASHING IN
DERRICK. CONT. PAINTING TANK
FARM PUMP HOUSE.
REMOVE 5 1/2 LINERS ON #1 MP,
REMOVE CAPS AND INSPECT SEATS
& VALVES. REMOVE
WEAR PLATES AND WIRE WHEEL.
PUMP DEEP CLEAN PILL THROUGH
TANK FARM RIG LINES
AND OFFLAOD TO ROCKWASHER.
REPLACE ABSORB IN PIPESHED
UNDER HYDRAULIC
UNIT
0.0 0.0
9/18/2022
18:00
9/19/2022
00:00
6.00 MIRU, MOVE MOB P CON'T CLEANING OF RIG FLOOR,
REMOVE ROTARY TABLE COVER
AND BEGIN CLEANING
INSPECT VALVE AND SEATS ON MP
#2, INSTALL 6" LINERS ON MP #2
ASSIST IN CRACK CHECKING ON 5"
DERRICK FINGERS
PREP BOILER #2 FOR INSPECTION,
REMOVE HCR KILL AND MOBILIZE
NEW ONE FOR
INSTALL
0.0 0.0
9/19/2022
00:00
9/19/2022
06:00
6.00 MIRU, MOVE MOB P CON'T WITH LINER SWAP AND
MAINTENCE ON MP #2, INSTALL NEW
HCR KILL ON BOP,
CON'T CLEANING ROTARY TABLE
AND RIG FLOOR, HOUSE KEEPING
THROUGH OUT RIG AS
NEEDED
0.0 0.0
9/19/2022
06:00
9/19/2022
12:00
6.00 MIRU, MOVE MOB P TROUBLESHOOT ROTARY TABLE.
CONT. CLEANING DERRICK
WINDWALLS. TEST RUN C-27
CAT. SERVICE DERRICK
CENTRIFUGE. CONT. WITH MUD
PUMP LINER SWAP. OFFLOAD
USED DIESEL AND USED OIL OFF
RIG
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 2/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/19/2022
12:00
9/19/2022
18:00
6.00 MIRU, MOVE MOB P CONT. CLEANING WIND WALLS. AK
BOILER INSP. INSPECTED #1 BOILER
(EXTERNAL) #2
BOILER (INTERNAL). PREP #2
BOILER FOR ASSEMBLY. INSTALL
ROTARY TABLE COVER.
REMOVE HOTSY FROM RIG FLOOR.
INSTALL 4" DOUBLE LOCKING
CAMLOKS IN TANK FARM
PUMP HOUSE. CONT. INSTALLING 6"
LINERS IN MUD PUMPS. CLEAN
CENTRIFUGAL ROOM
SUCTION LINES
0.0 0.0
9/19/2022
18:00
9/20/2022
00:00
6.00 MIRU, MOVE MOB P OPEN RAM DOORS ON BOP AND
INSPECT FOR "BWM", FINISH UP
MAINTENCE ON MP #2,
CLEAN PITS IN ROCKWASH, CON'T
WITH HOUSE KEEPING THROUGH
OUT RIG, PUT BOILER
#2 BACK TOGETHER
0.0 0.0
9/20/2022
00:00
9/20/2022
06:00
6.00 MIRU, MOVE MOB P CON'T W/ "BWM", INSTALL NEW XT-
39 SAVER SUB, TQ TO 45K, REMOVE
ADAPTOR FLANGE
FROM RISER AND STAGE FOR RIG
MOVE, CON'T WITH RIG CLEANING,
CON'T WITH BOILER
WORK ON #2, INSTALL NEW CLIPPER
SEALS ON MP #2, CLEAN SCREENS
AND SUCTION
CHAMBER
0.0 0.0
9/20/2022
06:00
9/20/2022
12:00
6.00 MIRU, MOVE MOB P CHANGE OUT TD BELL GUIDE F/ 4".
CHANGE OUT CLIPPER SEALS ON
MUD PUMP #1.
BRING 5" DERRICK FINGERS TO RIG
FLOOR AND PREP FOR INSTALLING
IN DERRICK.
INSTALL BOILER #2 HAND HOLES.
CONT. PRESSURE WASHING RIG
EXTERIOR WIND
WALLS. CLEAN AND ORGANIZE
PARTS. PRIME AND PAINT BARE
METAL.
0.0 0.0
9/20/2022
12:00
9/20/2022
18:00
6.00 MIRU, MOVE MOB P REMOVE 5-7/8" DP DERRICK
FINGERS AND REPLACE WITH 5" DP
FINGERS. CONT.
ASSEMBLY OF BOILER #2. REMOVE
SHAKER SCREEN AND PREP FOR
CD-1. CONT.
CHANGING OUT CLIPPER SEALS ON
MUD PUMP #1.
0.0 0.0
9/20/2022
18:00
9/21/2022
00:00
6.00 MIRU, MOVE MOB P CON'T WITH BOILER WORK ON #1,
CON'T W/ PUTTING MP #1 BACK
TOGETHER, HOUSE
KEEPING THROUGH OUT RIG,
REMOVE BLIND AND VBR'S, SEND
TO SHOP TO BE REBUILT,
PRESSURE WASHING BOP DECK
0.0 0.0
9/21/2022
00:00
9/21/2022
06:00
6.00 MIRU, MOVE MOB P FINISH WORKING/INSPECTION ON
MP#1 CONT. WITH CLEANING OF
BOP DECK REMOVE HCR FROM BOP
DECK AND TAKE TO SHOP, WEEKLY
DERRICK INSPECTION, GENERAL
HOUSE KEEPING AND WORK
ORDERS
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 3/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/21/2022
06:00
9/21/2022
12:00
6.00 MIRU, MOVE MOB P SET MUD PUMP RELIEF VALVES,
HOUSEKEEPING IN BOP DECK.
REBUILD LOWER 3½ X 6" VBRS,
CHANGE OUT LINKS ON THE TOP
DRIVE BALES. CHANGE OUT #2
MUD PUMP PULSATION DAMPNER.
0.0 0.0
9/21/2022
12:00
9/21/2022
18:00
6.00 MIRU, MOVE MOB P CONTINUE TO CHANGE OUT
PULSATION DAMPNER ON #2 MUD
PUMP & FILL WITH NITROGEN TO
900 PSI. CONTINUE TO CLEAN IN
THE BOP DECK AND CELLAR AREAS.
SEND BLIND/SHEAR RAMS TO THE
SHOP FOR REBUILD. REPAIR
HOTSY PRESSURE WASHER.
REPAIR LEAKING DRAGON WATER
HEATER IN THE PUMP ROOM.
COMPLETE PIPESHED AND BOILER
INVENTORIES. CHECK PSI IN
ACCUMULATOR BOTTLES.
0.0 0.0
9/21/2022
18:00
9/22/2022
00:00
6.00 MIRU, MOVE MOB P LOCATE ALL 5 7/8" HANDLING
EQUIPMENT AND STAGE FOR
INVENTORY. CONTINUE CLEANING
IN BOP DECK AND CELLAR AREAS.
COMPLETE MP2'S AS NEEDED.
PREP BOILER #2 FOR STATE
INSPECTION.
0.0 0.0
9/22/2022
00:00
9/22/2022
06:00
6.00 MIRU, MOVE MOB P GENERAL HOUSEKEEPING, RIG
MP2'S, CHECK OIL AND INSPECT
MOVING GENERATORS.
0.0 0.0
9/22/2022
06:00
9/22/2022
12:00
6.00 MIRU, MOVE MOB P GENERAL HOUSEKEEPING, RIG
MP2'S, REMOVE SUB
INTERCONNECT LINES, REMOVE
LVT PUMP PLUMBING AND CLEAN
OUT NUT PLUG, WELD INSPECTION
HATCH ON PITS DRAG CHAIN. WELD
SPRAY PORTS ON CENTRIFUGE
DUMP AND INSPECTION HATCH.
0.0 0.0
9/22/2022
12:00
9/22/2022
18:00
6.00 MIRU, MOVE MOB P CONTINUE TO REMOVE
INTERCONNCTS ON THE SUB.
FINISH WELDING PROJECTS IN THE
PITS. INSTALL 3½ X 6" VBR'S INTO
LOWER RAMS. REMOVE PUMP
ROOM INTERCONNECTS AND POP
OFF LINES OVER THE WATER
TANKS. REMOVE MUD LINE
INTERCONNECTS IN THE PITS.
0.0 0.0
9/22/2022
18:00
9/23/2022
00:00
6.00 MIRU, MOVE MOB P CONTINUE WITH PUMP ROOM
INTERCONNECTS AND POP OFF
LINES. CONTINUE WITH MUD LINE
INTERCONNET LINES. CHANGE OUT
CHARGE PUMP SUCTION HOSES.
CONTINUE WITH GENERAL
HOUSEKEEPING AND RIG MP2'S.
0.0 0.0
9/23/2022
00:00
9/23/2022
06:00
6.00 MIRU, MOVE DMOB P GENERAL HOUSEKEEPING AND RIG
MP2'S. INSPECT MOVING SYSTEMS
ON EACH MODULE. PRIME AND
PAINT FLOOR AT PUMP ROOM
INTERCONNECTS. CHECK AIR
PRESSURE IN MOVING SYSTEM
TIRES.
0.0 0.0
9/23/2022
06:00
9/23/2022
12:00
6.00 MIRU, MOVE DMOB P CLEAN AND INSPECT THREADS ON
MUD PUMP POP OFF LINES. RIG
INVENTORIES. REPAIR BRIDGE
CRANE IN PIPESHED AND PREP
SKATE RAIL FOR REMOVAL.
REBUILD BLIND SHEAR RAMS.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 4/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/23/2022
12:00
9/23/2022
18:00
6.00 MIRU, MOVE DMOB P GENERAL HOUSEKEEPING AND RIG
MP2'S. STAGE BLIND SHEAR RAMS
IN BOP DECK. LAY DOWN PIPE
SKATE RAIL INTO PIPESHED.
TROUBLE SHOOT BOILER HOTWELL.
CONT WITH REPAIR OF BRIDGE
CRANE IN PIPESHED. CHANGE OUT
WATER SOFTENER FILTERS.
0.0 0.0
9/23/2022
18:00
9/24/2022
00:00
6.00 MIRU, MOVE DMOB P INSTALL BLIND/SHEAR RAMS,
BREAK TOP AND BOTTOM RAM
DOORS TO GET PICTURES FOR
BWM. CONTINUE TO PRESSURE
WASHING EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG. CONTINUE
TO CHANGE OUT WATER SOFTNER
FILTERS. SECURE UPPER
PIPESKATE SECTION TO RAILS IN
PIPESHED.
0.0 0.0
9/24/2022
00:00
9/24/2022
06:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG. CUT
AND SLIP 88' OF 1.375" DRILL LINE.
DISCONNECT KOOMEY HOSES
FROM BOP STACK.
0.0 0.0
9/24/2022
06:00
9/24/2022
12:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG. C/O
STEAM VALVES FOR STEAM
DRAGON ISOLATION. BEGIN LAYING
MATS ON CD-4 ACCESS ROAD.
0.0 0.0
9/24/2022
12:00
9/24/2022
18:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG.
CONTINUE LAYING MATS ON CD-4
ACCESS ROAD. PM ON JOHN
DEERE MOVING GENS. BEGIN
STAGING - ORGANIZING MATS ON
CD-2.
0.0 0.0
9/24/2022
18:00
9/25/2022
00:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG. TEST
RUN NEW TELESCOPING MPD
RISER THOUGH ROTARY TABLE.
CHANGE OUT DRILLER SIDE BOP
BRIDGE CRANE CABLE. CLEAN OUT
ALL DRAINS AROUND ROTARY
TABLE. CONTINUE CHANGING OUT
2" STEAM VALVES
IN PUMP ROOM.
0.0 0.0
9/25/2022
00:00
9/25/2022
06:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG.
EXPIDITE XO NEEDED FOR CD1-33
TO THE RIG FLOOR.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 5/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/25/2022
06:00
9/25/2022
12:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG.
CONTINUE TO LAY MATS ON CD-4
ACCESS ROAD. CONTINE TO STAGE
MATS AT CD-2. REMOVE
BEAVERSLIDE. PRIME AND PAINT
MPD RISER.
0.0 0.0
9/25/2022
12:00
9/25/2022
18:00
6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH
EXTERIOR PARTS OF RIG.
CONTINUE HOUSEKEEPING
AND MP2'S AROUND THE RIG.
CONTINUE TO LAY MATS ON CD-4
ACCESS ROAD. CONTINE TO STAGE
MATS AT CD-2. INSPECT MOVING
SYSTEM HYDRAULICS.
0.0 0.0
9/25/2022
18:00
9/26/2022
00:00
6.00 MIRU, MOVE DMOB P NIPPLE DOWN BOPE STACK AND
REMOVE FROM BOP DECK.
CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG.
0.0 0.0
9/26/2022
00:00
9/26/2022
06:00
6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG. ORGANIZE
THE PAD.
0.0 0.0
9/26/2022
06:00
9/26/2022
12:00
6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG. CONTINUE
TO LAY MATS ON CD-4 ACCESS
ROAD. MODIFY WATER SOFTENER
BASE STAND. STAGE COMPLEX
AXLE AT CD-1.
0.0 0.0
9/26/2022
12:00
9/26/2022
18:00
6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG. CONTINUE
CLEANING OUTSIDE OF THE RIG.
CONTINUE TO LAY MATS ON CD-4
ACCESS ROAD. PREP NEW SUB
TIRES FOR INSTALL. PAINT NEW
WATER SOFTENER STAND.
0.0 0.0
9/26/2022
18:00
9/27/2022
00:00
6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG. CONTINUE
CLEANING OUTSIDE OF THE RIG.
BEGIN TO LAY MATS ON MAIN ROAD
TO AIRPORT RUNWAY. CONTINUE TO
PAINT NEW WATER SOFTENER
STAND.
0.0 0.0
9/27/2022
00:00
9/27/2022
06:00
6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND
MP2'S AROUND THE RIG.
CONTINUE TO LAY MATS ON MAIN
ROAD TO AIRPORT RUNWAY. BLOW
DOWN STEAM AND WATER TO THE
ROCKWASHER. DISCONNECT
ROCKWASHER FROM THE RIG.
PREP LOCATION FOR SPLITTING
THE RIG APART.
0.0 0.0
9/27/2022
06:00
9/27/2022
12:00
6.00 MIRU, MOVE DMOB P PREP SUB FOR SKIDDING RIG
FLOOR. PREP PITS FOR RIG MOVE.
FINISH PREP WORK ON
ROCKWASHER FOR MOVING.
RELOCATE WASHER/DRYER AND
WATER SOFTNER IN BOILER ROOM.
0.0 0.0
9/27/2022
12:00
9/27/2022
15:45
3.75 MIRU, MOVE DMOB P RELOCATE WASHER/DRYER AND
WATER SOFTNER IN BOILER ROOM.
PREP PIPSHED STAIRS FOR
REMOVAL. CONTINUE
HOUSEKEEPING AROUND THE RIG.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 6/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/27/2022
15:45
9/27/2022
18:00
2.25 MIRU, MOVE DMOB P SWAP FROM CAT POWER TO COLD
STARTS. BLOW DOWN WATER AND
STEAM. DISCONNECT AIR AT ALL
INTERCONNECTS. UNPLUG
ELECTICAL INTERCONNECTS ON
ALL MODS.
0.0 0.0
9/27/2022
18:00
9/27/2022
20:00
2.00 MIRU, MOVE DMOB P BREAK APART ALL INTERCONNECTS.
PREP ALL MODS FOR PULLING
APART. RAISE ALL LANDINGS AND
PICK UP OUTSIDE AROUND RIG.
0.0 0.0
9/27/2022
20:00
9/27/2022
20:30
0.50 MIRU, MOVE DMOB P MOVE PIPESHED TO STAGING AREA
AT ENTRANCE TO THE PAD. SIMOPS
- REMOVE ROCKWASHER FROM
COURT YARD AND STAGE AT
ENTRANCE TO THE PAD. - SET
MOTOR COMPLEX ON SUSPENSION.
0.0 0.0
9/27/2022
20:30
9/27/2022
21:15
0.75 MIRU, MOVE DMOB P MOVE MOTOR COMPLEX AND
STAGE FOR TRANSPORT TO CD1.
SIMOPS - SET PUMP COMPLEX ON
SUSPENSION.
0.0 0.0
9/27/2022
21:15
9/27/2022
21:30
0.25 MIRU, MOVE DMOB P MOVE PUMP COMPLEX AND STAGE
FOR TRANSPORT TO CD1. SIMOPS -
SET PIT COMPLEX ON SUSPENSION.
0.0 0.0
9/27/2022
21:30
9/27/2022
22:00
0.50 MIRU, MOVE DMOB P MOVE PIT COMPLEX AND STAGE
FOR TRANSPORT TO CD1. SIMOPS -
PICKUP MATS FROM UNDER RIG.
0.0 0.0
9/27/2022
22:00
9/27/2022
23:30
1.50 MIRU, MOVE DMOB P SKID RIG FLOOR. SIMOPS - INSTALL
SUB TOW TONGUE.
0.0 0.0
9/27/2022
23:30
9/28/2022
00:00
0.50 MIRU, MOVE DMOB P RAISE AND SECURE SUB
STOMPERS.
0.0 0.0
9/28/2022
00:00
9/28/2022
01:00
1.00 MIRU, MOVE DMOB P PULL SUB OFF WELL AND STAGE
FOR TIRE REMOVAL, STAIR
REMOVAL, AND TRANSPORT TO
CD1.
0.0 0.0
9/28/2022
01:00
9/28/2022
06:00
5.00 MIRU, MOVE DMOB P PICK UP REMAINING MATS FROM
UNDER RIG. SEND MATS TO BE
USED AT CD2-4 INTERSECTION.
CLEAN AND ORGANIZE AROUND
WELLHEAD. REMOVE I BEAMS &
CURTAINS ON ODS FOR TIRE
REMOVAL.
0.0 0.0
9/28/2022
06:00
9/28/2022
12:00
6.00 MIRU, MOVE DMOB P CHANGE OUT BOTH ODS SETS OF
SUB TIRES AS PER AFC REP.
GREASE RIG FLOOR SKID RAILS.
CONTINUE TO LAY MATS AT CD2-4
INTERSECTION.
0.0 0.0
9/28/2022
12:00
9/28/2022
20:00
8.00 MIRU, MOVE DMOB P CONTINUE CHANGING OUT SUB
ODS TIRES. CONTINUE TO LAY
MATS AT CD2-4 INTERSECTION.
STAGE PLYWOOD AT INTERSECTION
NEAR RUNWAY. P/U TOOLS AROUND
WHEEL WELL TO SUB.
0.0 0.0
9/28/2022
20:00
9/28/2022
21:00
1.00 MIRU, MOVE DMOB P REMOVE PIPESHED STAIRS VIA
CRANE OPERATION.
0.0 0.0
9/28/2022
21:00
9/29/2022
00:00
3.00 MIRU, MOVE DMOB P INSTALL SUB WHEEL WELL I BEAM.
HANG WHEEL WELL CURTAINS.
FUEL COLD STARTS/AIR HEATERS
ON ALL MODULES. CONT PICKING
UP/ORGANIZING PAD.
PREP/ORGANIZE EQUIPMENT FOR
SHIPPING TO CD1.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 7/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/29/2022
00:00
9/29/2022
06:00
6.00 MIRU, MOVE DMOB P STAGE PLYWOOD ALONG ROUTE TO
CD1. CONTINUE TO STAGE 40' MATS
AT APRON ON CD1. CONTINUE TO
ORGANIZE EQUIPMENT FOR
SHIPMENT TO CD1.
0.0 0.0
9/29/2022
06:00
9/29/2022
12:00
6.00 MIRU, MOVE DMOB P CLEAN ELECTRICAL PLUGS AND
CAPS IN PITS INTERCONNECT.
MONITOR/METER COLD START FUEL
USAGE FOR RIG MOVE.
STRATEGICALLY LAY PLYWOOD ON
CD4 ACCESS ROAD TOWARDS
GUARDSHACK.
0.0 0.0
9/29/2022
12:00
9/29/2022
18:00
6.00 MIRU, MOVE DMOB P CONTINUE TO ORGANIZE PAD FOR
EQUIPMENT MOVEMENT TO CD1.
CONTINUE TO CLEAN ELECTICAL
PLUGS AND CAPS IN PITS
INETERCONNECT.
0.0 0.0
9/29/2022
18:00
9/30/2022
00:00
6.00 MIRU, MOVE DMOB P CONTINUE TO LAY PLAYWOOD
FROM CD4 ACCESS ROAD TO
GUARDSHACK. DOUBLE MAT
PIPELINE CROSSING AT ENTRANCE
TO THE RUNWAY. MOVE CELLAR
WALLS FOR 10 FOOT CENTERS.
0.0 0.0
9/30/2022
00:00
9/30/2022
06:00
6.00 MIRU, MOVE DMOB P CONT W/ PREP FOR RIG MOVE,
STAGE & LAY RIG MATTS AS
DIRECTED. LOCATE XO'S &
SIDE ENTRY SUBS FOR UPCOMING
WELL WORK, ADJUST INNER
CONNECT CUSHIONS
THROUGHOUT MODULES,
ORGANIZE FMC WELLHEAD
COMPONETS.
0.0 0.0
9/30/2022
06:00
9/30/2022
09:00
3.00 MIRU, MOVE DMOB P HOOK OP SOWS TO PUMP AND
POWER MODULES, MOVE POWER
MODULE DOWN TO PAD
TO PREP FOR DRIVING OVER
GROUND DISTURBANCE SENSORS
ONCE RIG MOVE HAS
BEGUN. SIMOPS- CLEAN AND CLEAR
ALL DEBRIS AROUND CD4 PAD/CD4-
597 WELL
0.0 0.0
9/30/2022
09:00
9/30/2022
09:30
0.50 MIRU, MOVE DMOB P DRIVE OVER GROUND
DISTURBANCE SENSORS WITH
MODULES FOR CPAI.
0.0 0.0
9/30/2022
09:30
9/30/2022
11:00
1.50 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES
FROM CD4 T/ GUARD SHACK @ CD4
ACCESS ENTRANCE,
HOLD THERE FOR FLIGHT TRAFFIC
0.0 0.0
9/30/2022
11:00
9/30/2022
12:00
1.00 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES
FROM CD4 T/ GUARD SHACK @ CD4
ACCESS ENTRANCE,
HOLD THERE FOR FLIGHT TRAFFIC
0.0 0.0
9/30/2022
12:00
9/30/2022
13:00
1.00 MIRU, MOVE MOB P HOLD AT THE END OF THE AIR STRIP
FOR LIGHTS TO BE REMOVED.
0.0 0.0
9/30/2022
13:00
9/30/2022
14:00
1.00 MIRU, MOVE MOB P PROCEED DOWN THE AIR STRIP TO
TARMAC, ONCE @ TARMAC UNHOOK
SOWS F/
PUMP/POWER MODULES AND
RETURN TO CD4 TO RETRIEVE
PIPE/PIT MODULES
0.0 0.0
9/30/2022
14:00
9/30/2022
14:30
0.50 MIRU, MOVE MOB P DRIVE OVER GROUND
DISTURBANCE SENSORS WITH
MODULES FOR CPAI
0.0 0.0
9/30/2022
14:30
9/30/2022
16:00
1.50 MIRU, MOVE MOB P MOVE PIPE/PITS MOULES FROM
CD4 TO CDI TARMAC
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 8/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
9/30/2022
16:00
9/30/2022
16:30
0.50 MIRU, MOVE MOB P RELEASE SOWS FROM PIPE/PIT
MODULES, HOOK SOWS UP TO
PUMP/POWER MODULES
0.0 0.0
9/30/2022
16:30
9/30/2022
18:00
1.50 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES
FROM TARMAC TO CD1 PAD PAST
CD1-33, RELASE SOWS
TO RETRIEVE/ MOVE PIPE/PIT
MODULES ONTO CD1 PAD.
0.0 0.0
9/30/2022
18:00
9/30/2022
19:00
1.00 MIRU, MOVE MOB P CONT MOVING & STAGE PIPE SHED
MODULE @ CD1, LEAVE CLEARANCE
FOR
LSR(HOTOIL T/ RIG UP ON WELL).
0.0 0.0
9/30/2022
19:00
9/30/2022
20:30
1.50 MIRU, MOVE MOB P HOOK UP NES TRUCK T/ SUB
MODULE @ CD4 & TRANSPORT THE
SUB BASE ACROSS CPAI
WEIGHT SENSORS FOR LOAD
RATINGS AS PER CPAI.
0.0 0.0
9/30/2022
20:30
10/1/2022
00:00
3.50 MIRU, MOVE MOB P BEGIN TRANSPORT OF SUB
MODULE W/ NES TRUCKS F/ CD4 T/
ACCESS ROAD FOR CD2 &
RUNWAY
0.0 0.0
10/1/2022
00:00
10/1/2022
01:00
1.00 MIRU, MOVE MOB P CONT W/ TRANSPORT OF SUB
MODULE W/ NES TRUCKS F/ CD4 T/
ACCESS ROAD FOR CD2
& RUNWAY.
0.0 0.0
10/1/2022
01:00
10/1/2022
01:45
0.75 MIRU, MOVE MOB P TROUBLESHOOT THE SUB
MODULES STEARING CONTROL BOX
FOR BOTH STEARING
RAMS, ( OBSERVED BROKEN WELDS
ON THE MAIN STEARING UNIT,
DOESNT ALLOW THE
STEARING RAMS TO TURN &
FUNCTION THE REAR RIG TIRES ON
THE SUB).
0.0 0.0
10/1/2022
01:45
10/1/2022
03:00
1.25 MIRU, MOVE MOB P PJSM, CONT MOVING THE SUB
MODULE F/ CD2 ACCESS ROAD TO
RUNWAY
0.0 0.0
10/1/2022
03:00
10/1/2022
03:30
0.50 MIRU, MOVE MOB P WHILE PULLING ONTO TANSITION
MATS & DOUBLE MATS @ THE
BRIDGE CROSSING NES
SNAPPED A CABLE USED TO
CONNECT THE TRUCKS WITH,
AFTER X4 ATTEMPTS WE WERE
SUCCESSFULL ON CROSSING THE
TRANSITION MATS ON THE BRIDGE
0.0 0.0
10/1/2022
03:30
10/1/2022
04:00
0.50 MIRU, MOVE MOB T CONT TRANSPORTING THE SUB
MODULE ONTO THE RUNWAY &
STAGE IN THE MIDDLE TO KEEP
CLEAR PATHS FOR TRAFFIC TO
PASS.
0.0 0.0
10/1/2022
04:00
10/1/2022
06:00
2.00 MIRU, MOVE MOB T SECURE THE SUB MODULE ON
PLYWOOD & PREP FOR REPAIR ON
STEARING CONTROL
BOX
0.0 0.0
10/1/2022
06:00
10/1/2022
08:30
2.50 MIRU, MOVE MOB T REMOVE STEERING CONTROL BOX
AND CROSS BEAM FROM SUB/ SEND
TO THE SHOP
FOR WELDERS TO REPAIR, MOVE
ROCKWASHER FROM TARMAC TO
CD1 PAD.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 9/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/1/2022
08:30
10/1/2022
12:00
3.50 MIRU, MOVE MOB T FUEL ALL MODULES, CLEAN/CLEAR
ACCUMULATED TRASH FROM ALL
MODULES. MOVE 40' STARTING MAT
FOR RIG MAT LAYOUT, P/U
PLYWOOD AT CD2
INTERSECTION/STACK NEXT OTHER
BUNDLE
0.0 0.0
10/1/2022
12:00
10/1/2022
18:00
6.00 MIRU, MOVE MOB T REMOVE MATS LAYED OUT FOR SUB
TO LAY HERCULITE, LAY HERCULITE
FOR SUB
FOOTPRINT ONCE ON LOCATION,
SET STARTING MAT IN PLACE THEN
LAY ONLY 2 MATS IN FRONT TO
SAVE ROOM FOR CENTERING UP W/
SUB STRUCTURE, LAY OUT MATS
FOR PUMP/PIT MODULES, PREP FOR
STAGING TRANSITIONS ONTO RIG
MATS
0.0 0.0
10/1/2022
18:00
10/1/2022
20:30
2.50 MIRU, MOVE MOB T PREP ALL TOOLS & RIGGING IN SUB
MODULE WHEEL WELL FOR INSTALL
ON STEARING
CONTROL ASSEMBLY, FINISH FAB
WORK ON STEARING BOX CONTROL
SYSTEM &
TRANSPORT F/ CD2 TO RUNWAY
FOR INSTALL
0.0 0.0
10/1/2022
20:30
10/2/2022
00:00
3.50 MIRU, MOVE MOB T MOUNT & PIN IN PLACE STEARING
CONTROL BOX, STEARING RAMS, &
TRAVEL
ASSEMBLY, CONNECT HYDRAULIC
LINES & FUNCTION TEST(ALL
WORKED GOOD). SIMOP MOVE RIG
MATS AWAY FROM CD1-33/WD04 TO
LEVEL & PREP PAD FOR SUB BASE
RIG
MATS, REPOSITION RIG MATS IN
PLACE & CONTINUE LAYING RIG
MATS FOR REMAINING MODULES.
0.0 0.0
10/2/2022
00:00
10/2/2022
00:30
0.50 MIRU, MOVE MOB T PICK UP ALL TOOLS AND
EQUIPMENT USED FOR WORK
CONDUCTED ON THE STEARING
BOX INSTALL. RAISE RIG ON
SUSPENSION AND PICKUP
PLYWOOD FROM UNDER SUB BASE.
0.0 0.0
10/2/2022
00:30
10/2/2022
02:00
1.50 MIRU, MOVE MOB P TRANSPORT SUB BASE FROM
RUNWAY TO CD1 TARMAC.
SCRATCH AREA INFRONT OF
RUNWAY ACTUATION ARMS AND
PREP MATS FOR SUB.
0.0 0.0
10/2/2022
02:00
10/2/2022
04:30
2.50 MIRU, MOVE MOB P TRANSPORT SUB DOWN LAKE VIEW
DRIVE AND LINE UP FOR SPOTTING
OVER CD1-33A.
0.0 0.0
10/2/2022
04:30
10/2/2022
05:15
0.75 MIRU, MOVE MOB P SPOT SUB OVER CD1-33A.
WITNESSED BY CD1 PAD
OPERATOR.
0.0 0.0
10/2/2022
05:15
10/2/2022
06:00
0.75 MIRU, MOVE MOB P LOWER STOMPERS. SIMOPS -
REMOVE SUB TOW TONGUE.
0.0 0.0
10/2/2022
06:00
10/2/2022
10:30
4.50 MIRU, MOVE MOB P CONT TO LOWER STOMPERS -
ISSUES WITH ADJACENT PIPELINES
AND NEEDING TO REMOVE DIRT
FOR PROPER STOMPER
PLACEMENT. SIMOPS - SET MATS
FOR PIPESHED, ROCKWASHER, AND
POWER MODULE.
0.0 0.0
10/2/2022
10:30
10/2/2022
11:00
0.50 MIRU, MOVE MOB P SKID RIG FLOOR. 0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 10/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/2/2022
11:00
10/2/2022
12:00
1.00 MIRU, MOVE MOB P SPOT THE PIT MODULE. 0.0 0.0
10/2/2022
12:00
10/2/2022
13:00
1.00 MIRU, MOVE MOB P SPOT THE PUMP MODULE 0.0 0.0
10/2/2022
13:00
10/2/2022
14:00
1.00 MIRU, MOVE MOB P SPOT THE POWER MODULE 0.0 0.0
10/2/2022
14:00
10/2/2022
16:00
2.00 MIRU, MOVE MOB P SET ROCKWASHER. RELEASE BED
TRUCK AND SPOT WITH DOZER DUE
TO TIGHT CLEARANCES.
0.0 0.0
10/2/2022
16:00
10/2/2022
17:00
1.00 MIRU, MOVE MOB P SPOT THE PIPESHED. 0.0 0.0
10/2/2022
17:00
10/2/2022
18:00
1.00 MIRU, MOVE MOB P ELECTRICIAN PLUGGING IN
ELECTICAL AT ALL MODULE
INTERCONNECTS. ASSIST IN
PICKING UP PLYWOOD ALONG THE
CD-4 AND 5 ROADS. SECURE ALL
LANDINGS AROUND THE RIG.
START HOOKING UP ALL
INTERCONNECTS.
0.0 0.0
10/2/2022
18:00
10/2/2022
22:00
4.00 MIRU, MOVE MOB P CONTINUE TO HOOK UP ALL
INTERCONNECTS, INTRODUCE
STEAM, WATER AND AIR TO ALL
MODULES, STAGE 13 5/8" BOPE
COMPONENTS AT BOP DECK
BRIDGE CRANE PICKING AREA.
SWAP POWER FROM JOHN DEERE
COLD STARTS TO 3512 CAT.
0.0 0.0
10/2/2022
22:00
10/3/2022
00:00
2.00 MIRU, MOVE MOB P REMOVE MATS LAID FOR ACB
BOXES TO PLACE HERCULITE
UNDER THEM. P/U TOOLS AND
RIGGING USED TO CONNECT
INTERCONNECTS. ESTABLISH
STEAM AND WATER THROUGHOUT
ALL MODULES EXCEPT SUB
(WAITING ON WATER).
0.0 0.0
10/3/2022
00:00
10/3/2022
00:30
0.50 MIRU, MOVE SFTY P PJSM W/ CRANE OPERATOR AND
RIG CREW ON SETTING PIPESHED
STAIRS.
0.0 0.0
10/3/2022
00:30
10/3/2022
01:00
0.50 MIRU, MOVE MOB P CONT WITH RIG ACCEPTANCE
CHECKLIST. INSTALL LOWER
CELLAR WIND WALLS. HERCULITE
AROUND LOWER CELLAR WALLS.
SIMOPS - INSTALL PIPESHED STAIRS
AND LANDINGS.
0.0 0.0
10/3/2022
01:00
10/3/2022
03:45
2.75 MIRU, MOVE MOB P RIG UP PIPESKATE GUIDE RAIL AND
SPOOL UP SKATE CABLE. THAW
STEAM HEATER ON RIG FLOOR AND
VAC LINES IN THE PIT COMPLEX.
CONTINUE TO LOAD MATERIAL AT
CD4 FOR TRANSPORT TO CD1.
CONTINUE TO INSTALL PIPESHED
STAIRS AND LANDINGS.
0.0 0.0
10/3/2022
03:45
10/3/2022
06:00
2.25 MIRU, MOVE MOB P EXPIDITE 13 5/8" BOPE TO BOP
DECK AND ASSEMBLE. SIMOPS -
CONTINUE TO INSTALL PIPESHED
STAIRS AND LANDINGS.
0.0 0.0
10/3/2022
06:00
10/3/2022
12:00
6.00 MIRU, MOVE MOB P CONTINUE TO BUILD 13 5/8" BOPE.
SCOPE OUT CELLAR WIND WALLS
TO GAIN CLEARANCE IN CELLAR.
PREP PITS TO TAKE ON FLUID. FUEL
PUMP, POWER, AND PIPE MODULES.
0.0 0.0
10/3/2022
12:00
10/3/2022
14:00
2.00 MIRU, MOVE MOB P FINISH TORQING BOPE VIA
SWEENEY TORQUE WRENCH.
NIPPLE UP CHOKE AND KILL HCR'S.
SIMOPS - INSTALL BEAVERSLIDE
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 11/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/3/2022
14:00
10/3/2022
18:00
4.00 MIRU, MOVE MOB P CONNECT KOOMEY LINES TO BOPE,
LOAD 4" DP INTO PIPE SHED, STAGE
AND PREP 2"
HIGH PRESSURE EQUIPMENT-
HOSES, CHIKSANS, 90'S, LO-
TORQUES, ETC. IN CELLAR FOR
KILLING THE WELL,
CLEAN/ORGANIZE BOP DECK POST
RIG MOVE/ NIPPLE UP BOPE.
CLEAN/ORGANIZE RIG FLOOR. TAKE
ON 9.8 PPG BRINE TO PITS 3,4, AND
5.
0.0 0.0
10/3/2022
18:00
10/3/2022
21:00
3.00 MIRU, MOVE MOB P LOAD/STRAP/TALLY 135 JTS OF 4" XT
-39 14 LBS IN PIPESHED, CONDUCT
DERRICK
INSPECTION, STAGE 3.5"/4.5" TEST
JTS & 4.5" LANDING JT IN PIPESHED,
MOVE RIG MATS AT TENT TO CLEAR
TRAVEL PATH TO BACK OF RIG,
STAGE BULL RAIL INFRONT OF
PUMP MODULE, PREP RIG MATS
FOR PUMP HOUSE/MAG-TEC/TANK
FARM/ETC.
0.0 0.0
10/3/2022
21:00
10/4/2022
00:00
3.00 MIRU, MOVE MOB P SPOT ROCKWASHER CUTTINGS
TANK, SMOKE SHACK, PORTABLE
HEATER F/ MAG-TEC VAC UNIT, R/U
INJECTION LINE IN LOWER CELLAR,
HARD IRON ALIGNMENT TO KILL THE
WELL & MONITOR VIA TOTCO/CHART
RECORDER.
0.0 0.0
10/4/2022
00:00
10/4/2022
03:00
3.00 MIRU, MOVE MOB P GREASE CHOKE MANIFOLD AND
HCR VALVES FOR UPCOMING BOPE
TEST. LAY HERCULITE AND
BURMING FOR TANK FARM. STAGE
UPRIGHTS FOR THE TANK FARM.
STAGE CHOKE SKID. MOBILIZE XO'S
TO THE RIG FLOOR. FINISH WITH
RIG UP ON CD1-33 WD-04 TO
CIRCULATE KWB THROUGH THE
CHOKE SKID TO THE TIGER TANK.
0.0 0.0
10/4/2022
03:00
10/4/2022
06:00
3.00 MIRU, MOVE MOB P PLACE INTERCONNECT DUCK
PONDS BETWEEN MODULES. BLOW
DOWN INJECTION LINE, WORK ON
MP2'S. ASSIST MAGTEC WITH RIG
UP AS NEEDED. ASSIST HARLINE
CREW RIGGING UP CHOKE HOUSE
TO THE IA.
0.0 0.0
10/4/2022
06:00
10/4/2022
12:00
6.00 MIRU, MOVE MOB P INSPECT RIG UP FOR WELL KILL
OPS, CONT WORKING ON MP2'S,
PREP/PRIME MUD
PUMPS FOR USE, BLOW AIR TO
TIGER TANK, TAKE ON BRINE TO
PITS 3-7, SERVICE PIPE
SKATE, SERVICE ST-100, LOCATE 4
1/2" HANDLING EQUIPMENT.
0.0 0.0
10/4/2022
12:00
10/4/2022
13:00
1.00 MIRU, WELCTL OWFF P RIG UP TO BLEED OA TO TIGER
TANK, ONCE DHD REP. ON
LOCATION OPENED UP OA TO
BLEED TANK, BLEW DOWN LINES
AND RIGGED BACK UP TO IA.
0.0 0.0
10/4/2022
13:00
10/4/2022
13:30
0.50 MIRU, WELCTL SFTY P HOLD PJSM ON DISPLACING DIESEL
TO 9.8 PPG VIS BRINE - NaCl.
0.0 0.0
10/4/2022
13:30
10/4/2022
14:00
0.50 MIRU, WELCTL RURD P PULL TREE CAP PER FMC REP.,
CONFIRM TURN COUNT ON EUE
CROSSOVER PRIOR TO
PULLING BPV, PULL BPV PER FMC.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 12/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/4/2022
14:00
10/4/2022
15:00
1.00 MIRU, WELCTL SEQP P RIG UP/FLUID PACK LINES TO TIGER
TANK, TEST ALL SURFACE LINES
AND IA LINES TO
2000 PSI (GOOD)
0.0 0.0
10/4/2022
15:00
10/4/2022
16:00
1.00 MIRU, WELCTL DISP P DIPLACE WELL TO 9.8 PPG VIS
BRINE - NaCl THROUGH TUBING,
DIVERTING WELL FLUID RETURNS
TO TIGER TANK @ 6 BPM, 1000 PSI,
175 BBLS PUMPED ( 1758 TOTAL
STROKES).
0.0 0.0
10/4/2022
16:00
10/4/2022
16:30
0.50 MIRU, WELCTL OWFF P SHUT IN TUBING/ANNULUS TO
MONITOR WELL F/ 30 MIN. (STATIC).
0.0 0.0
10/4/2022
16:30
10/4/2022
17:30
1.00 MIRU, WELCTL CIRC P PUMP ANOTHER 50 BBLS (500 TOT.
STRKS) TO TIGER TANK, SWAP
RETURNS OVER TO
THE RIG AND CIRC BOTTOMS UP
WITH 6 BPM, 700 PSI, 38% F/O. 1755
TOTAL STROKES
0.0 0.0
10/4/2022
17:30
10/4/2022
18:45
1.25 MIRU, WELCTL OWFF P SHUT IN TUBING AND IA & OWFF F/30
MIN(STATIC) AS PER CPAI REP/FMC
REP.
0.0 0.0
10/4/2022
18:45
10/4/2022
20:00
1.25 MIRU, WHDBOP MPSP P R/D PUMP IN SUB & INJECTION LINE
F/ TBG, SET BPV AS PER FMC REP,
R/U INJECTION
LINE & CHART RECORDER T/ IA &
PREP T/ TEST BPV
0.0 0.0
10/4/2022
20:00
10/4/2022
20:45
0.75 MIRU, WHDBOP PRTS P TEST BPV TO 1500 PSI IN THE
DIRECTION OF FLOW FOR 10
CHARTED MIN. WITNESSED BY CPAI
REP/FMC REP.
0.0 0.0
10/4/2022
20:45
10/4/2022
21:45
1.00 MIRU, WHDBOP RURD P BLOW/RIG DWN ALL SURFACE
EQUIPMENT & TEST EQUIPMENT
USED FOR TESTING, CLEAN &
CLEAR LOWER CELLAR, STAGE
TOOLS & RIGGING F/ NIPPLE DWN
PRODUCTION TREE & SPEED HEAD
ASSEMBLY.
0.0 0.0
10/4/2022
21:45
10/4/2022
22:15
0.50 MIRU, WHDBOP NUND P PJSM, INSTALL EUE XO INTO
PRODUCTION TREE, P/U 4.5" TEST
JT WITH TOP DRIVE, M/U TO TOP OF
PRODUCTION TREE, BREAK
CONNECTION ON SPEED HEAD
ADAPTOR AS PER FMC SOP.
0.0 0.0
10/4/2022
22:15
10/5/2022
00:00
1.75 MIRU, WHDBOP NUND P BREAK SPEED HEAD ADAPTOR
CONNECTION W/ TOP DRIVE 8K P/U
W/ FREE TRAVEL, SET
BACK DWN SWAP RIGGING, P/U &
L/D PRODUCITON TREE, CLEAN
HANGER PROFILE AS PER FMC REP,
INSTALL BLANKING PLUG W/ 10 1/4
TURNS (RIGHT) & PLUG R/T 9 TURNS
(LEFT),
OBTAIN RKB'S UPPER L/D=34.22'/
LOWER L/D=36.16'.
0.0 0.0
10/5/2022
00:00
10/5/2022
02:00
2.00 MIRU, WHDBOP NUND P MOBILIZE SPEED HEAD ADAPTOR
TO THE BOP DECK AND NIPPPLE UP
ONTO THE WELL HEAD. SEPERATE
THE PRODUCTION TREE/SPEED
HEAD ADAPTOR AND STAGE FOR
SHIPMENT. TORQUE UP NEW
SPEED HEAD ADAPTOR AS PER FMC
REP.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 13/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/5/2022
02:00
10/5/2022
10:30
8.50 MIRU, WHDBOP NUND P NIPPLE UP 13 5/8" 5K BOPE.
CHANGE CONFIGURATION OF
KOOMEY LINES. ADD 18" SPACER
SPOOL, NIPPLE UP CHOKE AND KILL
LINES. NIPPLE UP BELL NIPPLE.
TORQUE ALL CONNECTIONS WITH
SWEENY WRENCH. OBTAIN RKB'S.
0.0 0.0
10/5/2022
10:30
10/5/2022
13:30
3.00 MIRU, WHDBOP RURD P R/U TESTING EQUIPMENT. SHELL
TEST BOPE (GOOD)
0.0 0.0
10/5/2022
13:30
10/5/2022
19:00
5.50 MIRU, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW
5,000 HIGH FOR 5 CHARTED MIN. W/
EXCEPTION OF
MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI FOR 5 CHARTED MIN,
W/ 4" TEST JT TEST ANNULAR, 2 7/8"
X 5 1/2" UPR, 2 7/8" X 5 1/2" LPR, W/ 4
1/2" TEST JT TEST
2 7/8" X 5 1/2" UPR & 2 7/8" X 5 1/2"
LPR, TEST CHOKE VALVES 1-15,
MANUAL OPERATED &
SUPER CHOKE, CHOKE & KILL
MANUALS & HCR'S, 4" VALVE ON
KILL LINE, 4" FOSV, 4" DART
VALVE, UPPER & LOWER IBOP;
BLIND/ SHEAR RAMS; PERFORM
KOOMEY DRAWDOWN, ACC
= 3050 PSI. MANIF. = 1550 PSI. ACC =
1750 PSI AFTER ALL FUNCTIONS ON
BOTTLES, 09 SEC
FOR 200 PSI. BUILD W/ 2 ELEC.
PUMPS, 68 SEC T/ BUILD FULL SYS.
PRESSURE W/ 2 ELEC. & 2 AIR
PUMPS, CLOSING TIMES ANNULAR =
10 SEC. UPR = 07 SEC. BLIND /
SHEARS = 16 SEC. LPR = 07 SEC.
CHOKE HCR = 2 SEC. KILL HCR = 2
SEC, X6 BACK UP NITROGEN
BOTTLES 1983 PSI, TEST PVT
GAIN/LOSS AND FLOW OUT ALARMS,
TEST LEL AND H2S ALARMS; AOGCC
REP AUSTIN McLEOD WITNESS THE
TEST.
0.0 0.0
10/5/2022
19:00
10/5/2022
20:00
1.00 MIRU, WHDBOP RURD P BLOW DOWN AND RIG DOWN
TESTING EQUIPMENT.
0.0 0.0
10/5/2022
20:00
10/5/2022
21:45
1.75 MIRU, WHDBOP RURD P INSTALL BOPE RISER. INSTALL
MOUSEHOLE. SIMOPS - MOBILIZE
DOYON CASINGS 4½ HANDLING
EQUIPMENT TO THE RIG FLOOR.
CHANGE ELEVATORS.
0.0 0.0
10/5/2022
21:45
10/5/2022
22:00
0.25 MIRU, WHDBOP MPSP P P/U TEE BAR AND PULL BPV AS PER
FMC REP.
0.0 0.0
10/5/2022
22:00
10/5/2022
23:30
1.50 SLOT, RPCOMP PULL P M/U 4½ LANDING JT & XO AND
ENGAGE TUBING HANGER. M/U THE
TOP DRIVE & BACK OUT LOCK
DOWNS. OBSERVE 108K P/U
WEIGHT TO UNSEAT THE HANGER.
89K FREE UP WT.
4,415.0 4,410.0
10/5/2022
23:30
10/6/2022
00:00
0.50 SLOT, RPCOMP CIRC P CIRCULATE A B/U STAGING PUMPS
UP TO 6 BPM, ICP - 230 FCP - 360,
35% F/O.
4,410.0 4,410.0
10/6/2022
00:00
10/6/2022
00:15
0.25 SLOT, RPCOMP CIRC P CIRCULATE A B/U STAGING PUMPS
UP TO 6 BPM, ICP - 230 FCP - 360,
35% F/O. 1005 TOTAL STKS
PUMPED.
4,410.0 4,410.0
10/6/2022
00:15
10/6/2022
00:30
0.25 SLOT, RPCOMP OWFF P OWFF (STATIC) 4,410.0 4,410.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 14/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/6/2022
00:30
10/6/2022
01:45
1.25 SLOT, RPCOMP PULL P DRAIN BOP STACK. PULL HANGER
TO FLOOR W/ 89K UP WT F/ 4410' MD
T/ 4,380' MD. L/D HANGER AND
LANDING JOINT. B/D TD.
4,410.0 4,380.0
10/6/2022
01:45
10/6/2022
07:00
5.25 SLOT, RPCOMP PULL P POOH W/ 4½ 12.6# L-80 IBTM
TUBING FROM 4,380' MD. UP WT -
89K. MONITOR DISP VIA TT. 102 JTS
TOTAL LAID DOWN.
4,380.0 0.0
10/6/2022
07:00
10/6/2022
09:30
2.50 SLOT, RPCOMP RURD P R/D AND L/D DOYON CASING
EQUIPMENT. SIMOPS - MOBILIZE
SCRAPER BHA TO THE RIG FLOOR.
CLEAN AND CLEAR RIG FLOOR.
0.0 0.0
10/6/2022
09:30
10/6/2022
10:00
0.50 SLOT, PLUG RURD P SET WEAR BUSHING PER FMC REP.
1.8" L, 9" ID, 10.80" OD.
0.0 0.0
10/6/2022
10:00
10/6/2022
10:15
0.25 SLOT, PLUG SFTY P PJSM ON P/U SCRAPER BHA. 0.0 0.0
10/6/2022
10:15
10/6/2022
11:00
0.75 SLOT, PLUG BHAH P M/U BAKER SCRAPER BHA AS PER
BAKER HAND T/ 20' MD.
0.0 20.0
10/6/2022
11:00
10/6/2022
16:00
5.00 SLOT, PLUG TRIP P RIH W/ SCRAPER BHA ON 4" DP.
PICKING UP DP 1X1 FROM THE
PIPESHED F/ 20' MD T/ 4,275' MD.
S/O WT - 99K. MONITOR DISP VIA TT.
20.0 4,275.0
10/6/2022
16:00
10/6/2022
16:45
0.75 SLOT, PLUG PMPO P KELLY UP T/ STAND 45, CIRC. B/U
WHILE RECIPROCATING FULL
STAND F/ 4,275' MD TO 4,180' MD,
RACK BACK STD 45, KELLY UP T/
STD 44 CIRC. B/U WHILE
RECIPROCATING FULL STAND TO
4,086' MD @ 600 GPM, 50 RPM, 1623
PSI, 1K TQ, 52% F/O. 2544 TOT.
STRKS. P/U WT= 97K, S/O WT=96K.
4,275.0 4,086.0
10/6/2022
16:45
10/6/2022
17:00
0.25 SLOT, PLUG OWFF P OWFF (STATIC) 4,086.0 4,086.0
10/6/2022
17:00
10/6/2022
20:00
3.00 SLOT, PLUG TRIP P BLOW DOWN TOP DRIVE. POOH F/
4,086' MD TO 20' MD. L/D SCRAPER
BHA. MONITOR DISP VIA TT.
4,086.0 0.0
10/6/2022
20:00
10/6/2022
21:30
1.50 SLOT, PLUG ELOG P SPOT AND R/U SLMB E-LINE.
SIMOPS - CLEAN AND CLEAR RIG
FLOOR.
0.0 0.0
10/6/2022
21:30
10/6/2022
22:30
1.00 SLOT, PLUG ELOG P PJSM, EXPIDITED E-LINE TOOLS TO
THE RIG FLOOR. HANG E-LINE
SHEAVES, AND M/U E-LINE TOOLS
AS PER SLMB REP.
0.0 0.0
10/6/2022
22:30
10/7/2022
00:00
1.50 SLOT, PLUG ELOG T TROUBLESHOOT BRAKE BAND ON
SPOOL UNIT.
0.0 0.0
10/7/2022
00:00
10/7/2022
01:30
1.50 SLOT, PLUG ELOG T CHANGE OUT SPOOLER BRAKE
BAND. RESPOOL ~1000' WIRE.
0.0 0.0
10/7/2022
01:30
10/7/2022
04:00
2.50 SLOT, PLUG ELOG P RIH WITH ISOLATION SCANNER TO
4,230' MD. MONITOR WELLBORE VIA
TT.
0.0 0.0
10/7/2022
04:00
10/7/2022
07:00
3.00 SLOT, PLUG ELOG P L/D ISOLATION SCANNER RUNNING
TOOLS. PICK UP & M/U SLMB
RUNNING TOOLS FOR CIBP.
0.0 0.0
10/7/2022
07:00
10/7/2022
09:00
2.00 SLOT, PLUG ELOG P RIH W/ CIBP VIA E-LINE. SET AT
4,223' MD. POOH WITH E-LINE.
0.0 0.0
10/7/2022
09:00
10/7/2022
10:00
1.00 SLOT, PLUG ELOG P R/D AND L/D E-LINE TOOLS AND
EQUIPMENT..
0.0 0.0
10/7/2022
10:00
10/7/2022
10:30
0.50 SLOT, PLUG ELOG P CLOSE BLIND RAMS AND TEST CIBP
TO 2500 PSI FOR 10 CHARTED
MINUTES (GOOD)
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 15/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/7/2022
10:30
10/7/2022
12:00
1.50 SLOT, PLUG WAIT P WAIT ON ORDERS FROM TOWN
WHILE ANALYZE LOGS FROM E-LINE
ISOLATION SCANNER RUN. - SIMOPS
- HOUSEKEEPING AND COMPLETE
DOYON MP-2 WORK ORDERS.
0.0 0.0
10/7/2022
12:00
10/7/2022
16:00
4.00 SLOT, PLUG PULD P BUILD 22 STDS OF 5" DP VIA
MOUSEHOLE AND RACK BACK IN
THE DERRICK.
0.0 0.0
10/7/2022
16:00
10/7/2022
21:00
5.00 SLOT, PLUG PULD T WORK RIG CONDITION AUDIT,
HOUSEKEEPING, AND DOYON MP-2
WORK ORDERS. SIMOPS - REPLACE
PIPE SKATE CHAIN SPROCKET
BEARINGS.
0.0 0.0
10/7/2022
21:00
10/7/2022
23:00
2.00 SLOT, PLUG PULD P BUILD 11 STDS OF 5" DP VIA
MOUSEHOLE AND RACK BACK IN
THE DERRICK.(33 TOTAL IN THE
DERRICK)
0.0 0.0
10/7/2022
23:00
10/7/2022
23:30
0.50 SLOT, PLUG SVRG P SERVICE SKATE. REPAIR PIPESHED
SKATE.
0.0 0.0
10/7/2022
23:30
10/8/2022
00:00
0.50 SLOT, PLUG PULD T REPAIR PIPESHED SKATE.
CONTINUE WITH HOUSEKEEPING,
RIG UP CELLAR FOR CIRCULATION,
PREP RIG FLOOR FOR GUN RUN.
0.0 0.0
10/8/2022
00:00
10/8/2022
01:00
1.00 SLOT, PLUG PERF P PJSM, M/U GUNS AS PER SLMB GUN
HAND TO 20' MD.
0.0 20.0
10/8/2022
01:00
10/8/2022
02:45
1.75 SLOT, PLUG TRIP P RIH W/ PERF GUNS ON 4" DP FROM
DERRICK TO 4,088' MD. M/U SINGLE
AND SET GUN ON DEPTH AT 4110'
MD. MONITOR DISP VIA TT.
20.0 4,110.0
10/8/2022
02:45
10/8/2022
03:45
1.00 SLOT, PLUG PERF P FLOOD SURFACE LINES, LINE UP
CHOKE TO GAS BUSTER, MUD PUMP
2 AND TEST CHART TO THE IA.
DROP 5/8" STEEL BALL.
4,110.0 4,110.0
10/8/2022
03:45
10/8/2022
04:00
0.25 SLOT, PLUG PERF P VERIFY DEPTH AS PER CPAI REP.
PUMP BALL DOWN AT 50 GPM. BALL
ON SEAT AND CONTINUE TO
PRESSURE UP TO FIRE GUNS.
GUNS FIRE AT 2328 PSI AND 27
TOTAL STKS.
4,110.0 4,110.0
10/8/2022
04:00
10/8/2022
05:00
1.00 SLOT, PLUG LOT P CLOSE IBOP, LINE UP TO INJECT VIA
IA, PRESSURE UP TO 930 PSI AND
OBSERVE PRESSURE BREAK OVER.
CONTINUE TO PUMP AND INCREASE
RATE TO 2 BPM, 640 PSI. 13 TOTAL
BBLS INJECTED. SHUT DOWN
OBSERVE PSI DROP TO 100PSI IN 15
MIN. INJECT ADDITIONAL 5 BBLS AT
2 BPM, 620 PSI.
4,110.0 4,110.0
10/8/2022
05:00
10/8/2022
06:15
1.25 SLOT, PLUG CIRC P BLEED OFF ALL PRESSURE. OWFF
(STATIC) CIRCULATE A BOTTOMS UP
AT 1 BPM, 1777 PSI, 20% F/O.
4,110.0 4,110.0
10/8/2022
06:15
10/8/2022
06:30
0.25 SLOT, PLUG OWFF P OWFF (STATIC) 4,110.0 4,110.0
10/8/2022
06:30
10/8/2022
09:30
3.00 SLOT, PLUG TRIP P L/D WORKING SINGLE TO PIPE
SHED. POOH AND RACK BACK 4". L/D
PERF GUNS & INSPECT. (ALL SHOTS
FIRED)
4,110.0 0.0
10/8/2022
09:30
10/8/2022
10:45
1.25 SLOT, PLUG BHAH P CLEAN & CLEAR FLOOR. BREAK
DOWN 7" SCRAPER BHA.
0.0 0.0
10/8/2022
10:45
10/8/2022
11:00
0.25 SLOT, PLUG BHAH P M/U CEMENT RETAINER AS PER
BAKER REP.
0.0 0.0
10/8/2022
11:00
10/8/2022
13:30
2.50 SLOT, PLUG TRIP P RIH W/CEMENT STINGER ASSY
T/4,048' MD. MONITOR DISP VIA TT.
0.0 4,048.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 16/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/8/2022
13:30
10/8/2022
15:00
1.50 SLOT, PLUG RURD P P/U CEMENT SWIVEL TO RIG FLOOR.
BREAK OUT 5" PUP JT AND REPLACE
W/4" XT 39 PUP JT. M/U TIW AND
CEMENT SWIVEL ASSY. R/U CEMENT
LINES.
4,048.0 4,048.0
10/8/2022
15:00
10/8/2022
15:30
0.50 SLOT, PLUG CIRC P CIRC DRILL STRING VOLUME W/5
BPM / 460 PSI. P/U WT 99K / S/O WT
98 K.
4,048.0 4,048.0
10/8/2022
15:30
10/8/2022
16:00
0.50 SLOT, PLUG PACK P SET CEMENT RETAINER AS PER
BACKER REP. BOTTOM OF
RETAINER 4,048' / TOP OF RETAINER
4,046'. CONFIRM SET WITH 20 K MAX
OVER PULL AND 30 K WOB. (FREE
P/U WT WAS 99 K AND FREE S/O
WAS WT 98 K)
4,048.0 4,048.0
10/8/2022
16:00
10/8/2022
16:15
0.25 SLOT, PLUG PRTS P BREAK CIRC THROUGH KILL LINE.
SHUT IN UPPER PIPE RAMS AND PT
IA/CEMENT RETAINER TO 1500 PSI &
CHART FOR 10 MIN. (GOOD) BLEED
OFF PSI AND OPEN RAMS
4,048.0 4,048.0
10/8/2022
16:15
10/8/2022
16:45
0.50 SLOT, PLUG LOT P SET 30 K WOB & INJECT INTO
LOWER QANNIK AT 2 BPM / 560 PSI.
PUMP 5 BBLS TOTAL. 820 PSI FRAC
PRESSURE
4,048.0 4,048.0
10/8/2022
16:45
10/8/2022
18:00
1.25 SLOT, PLUG SQEZ P SHUT IN ON UPPER PIPE RAMS &
TRAP 500 PSI ON IA. TURN OVER TO
SLB. FLUID PACK LINES W/2 BBLS
H2O AND PT LINES TO 2500 PSI.
(GOOD). PUMP 25 BBLS 15.8 PPG
CLASS G QANNIK BLEND CEMENT
W/2 BPM. INITIAL 530 PSI AND FINAL
108 PSI. DISPLACE WITH 9.8 PPG
BRINE 36 BBLS TOTAL
DISPLACEMENT. DISPLACED 31
BBLS W/2 BPM INITIAL 60 PSI AND
FINAL 250 PSI. 2 BBLS W/.5 BPM AT
130 PSI, AND PERFORMED
HESITATION SQUEEZES AT .5 BPM
FOR FINAL 3 BBLS INITIAL 175 PSI
AND FINAL 239 PSI. (20 BBLS BELOW
RETAINER WITH 17 BBLS INTO
PERF'S, AND LEFT 5 BBLS CEMENT
ABOVE RETAINER)
4,048.0 4,048.0
10/8/2022
18:00
10/8/2022
18:15
0.25 SLOT, PLUG RURD P BLEED OFF IA. OPEN UPPER RAMS.
UN-STING FROM RETAINER AS PER
BAKER REP. CIP @ 18:15 HRS
BOTTOM OF RETAINER 4,048' / TOP
OF RETAINER 4,046'
4,048.0 4,046.0
10/8/2022
18:15
10/8/2022
19:00
0.75 SLOT, PLUG RURD P R/D CEMENT SWIVEL. P/U SINGLE
FROM SHED. R/B STAND # 43.
FROM 4,045' MD T / 3,958' MD. B/D
CEMENT LINE.
4,046.0 3,958.0
10/8/2022
19:00
10/8/2022
19:30
0.50 SLOT, PLUG CIRC P RECIP PIPE FROM 3,958' MD T/ 3,864'
MD AND CIRC B/U WITH 250 GPM,
387 PSI, 37% F/O. TOTAL STKS
PUMPED - 2050. DUMPED 45 BBLS
TO ROCK WASHER W/2 BBLS GREEN
CEMENT
3,958.0 3,864.0
10/8/2022
19:30
10/8/2022
19:45
0.25 SLOT, PLUG OWFF P OWFF (STATIC), B/D T/D. PREP RIG
FLOOR FOR POOH
3,864.0 3,864.0
10/8/2022
19:45
10/8/2022
21:45
2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,864' MD
TO BAKER RUNNING TOOL. L/D
BAKER RUNNING TOOL. MONITOR
DISP VIA TT.
3,864.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 17/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/8/2022
21:45
10/8/2022
22:30
0.75 SLOT, PLUG WWWH P WASH STACK @ MAX RATE
CLEANING ALL CEMENT FROM
BOPE. B/D TD.
0.0 0.0
10/8/2022
22:30
10/8/2022
23:00
0.50 SLOT, PLUG RURD P P/U CEMENT SWIVEL AND C/O 5' PUP
TO A 10' XT-39 PUP.
0.0 0.0
10/8/2022
23:00
10/9/2022
00:00
1.00 SLOT, PLUG PULD P BUILD 9 STANDS OF 5" DP VIA
MOUSEHOLE.
0.0 0.0
10/9/2022
00:00
10/9/2022
08:00
8.00 SLOT, PLUG PULD P CONT. TO BUILD 5" DP AND RACK
BACK IN DERRICK VIA MOUSEHOLE.
SIMOPS - LOAD 30 JTS 3-1/2" HYD
563 CEMENT STINGER INTO PIPE
SHED.
0.0 0.0
10/9/2022
08:00
10/9/2022
11:00
3.00 SLOT, PLUG TRIP P RIH W/ 6 1/8 BIT, BIT SUB, XO AND 4"
DP TO 3,791' MD. MONITOR DISP VIA
TT.
0.0 3,791.0
10/9/2022
11:00
10/9/2022
11:30
0.50 SLOT, PLUG WASH P KELLY UP AND WASH DN FROM
3,791' MD TO TOP OF CEMENT @
3,988' MD. WASH DN @ 100 GPM,
180 PSI, 27% F/O. TAG W/ 8K. UP WT
- 98K, S/O WT - 99K. AOGCC REP
LOU LAUBENSTEIN WITNESS TAG.
3,791.0 3,988.0
10/9/2022
11:30
10/9/2022
12:00
0.50 SLOT, PLUG PRTS P POOH TO 3,981' MD & R/U AND TEST
CEMENT TO 1500 PSI FOR 30
CHARTED MIN (GOOD). AOGCC REP
LOU LAUBENSTEIN WITNESS THE
TEST.
3,988.0 3,981.0
10/9/2022
12:00
10/9/2022
14:00
2.00 SLOT, PLUG CIRC P R/D TESTING EQUIPMENT. KELLY UP
TO STD 42 AND CIRC B/U @ 300
GPM, 550 PSI, 50 RPM, 38% F/O.
ROT AND RECIP PIPE F/ 3,981' MD TO
3,887' MD W/ 1K TQ. OBSERVE
METAL PERF DEBRIS AT BUTTOMS
UP. CONTINUE TO CIRC PUMPING HI
VIS SWEEP S/S UNTIL RETURNS
CLEANED UP. TOTAL STKS PUMPED
- 4120.
3,981.0 3,981.0
10/9/2022
14:00
10/9/2022
16:00
2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,891' MD.
MONITOR DISP VIA TT. L/D BIT AND
BIT SUB.
3,891.0 0.0
10/9/2022
16:00
10/9/2022
17:00
1.00 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR.
PREP FOR GUN RUN.
0.0 0.0
10/9/2022
17:00
10/9/2022
17:30
0.50 SLOT, PLUG BHAH P P/U AND M/U PERF GUNS T/ 40' MD
AS PER PERF HAND.
0.0 40.0
10/9/2022
17:30
10/9/2022
19:45
2.25 SLOT, PLUG TRIP P RIH W/ TCP GUNS ON 4" DP F/ 40' MD
TO 3,923' MD. MONITOR DISP VIA TT.
S/O WT - 97K
40.0 3,923.0
10/9/2022
19:45
10/9/2022
20:15
0.50 SLOT, PLUG PERF P SPACE OUT. SET LOWER PERFS AT
3,923' MD. TOP PERFS AT 3892' MD.
DROP 5/8" STEEL BALL. FLOOD
SURFACE LINES. PUMP BALL DN AT
1 BPM, OBSERVE GUNS FIRE AT
2309 PSI. 25 TOTAL STKS PUMPED.
3,923.0 3,923.0
10/9/2022
20:15
10/9/2022
20:45
0.50 SLOT, PLUG LOT P CLOSE HCR CHOKE. CLOSE IBOP.
OPEN SECONDARY KILL LINE. PUMP
DN KILL INTO IA AT 5 SPM, OBSERVE
FORMATION BREAK OVER AT 775
PSI. PUMP ADDITIONAL 1 BBL FCP -
682. TOTAL STKS PUMPED - 23.
SHUT IN ISIP - 580, FSIP - 395 FOR 15
MIN.
3,923.0 3,923.0
10/9/2022
20:45
10/9/2022
21:30
0.75 SLOT, PLUG OWFF P ATTEMP TO CIRC B/U AND OBSERVE
3000 PSI. SHUT DN. CHECK
SURFACE LINES. NO
OBSTRUCTIONS ON SURFACE. B/D
TD. OWFF (STATIC)
3,923.0 3,923.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 18/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/9/2022
21:30
10/9/2022
23:30
2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3923' MD
TO 40' MD. UP WT - 98K. MONITOR
DISP VIA TT.
3,923.0 40.0
10/9/2022
23:30
10/10/2022
00:00
0.50 SLOT, PLUG BHAH P L/D PERF GUNS VIA MOUSEHOLE.
CONFIRM ALL SHOTS FIRED.
40.0 0.0
10/10/2022
00:00
10/10/2022
01:15
1.25 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR.
MOBILIZE CLEANOUT BHA
COMPONENTS TO THE RIG FLOOR.
0.0 0.0
10/10/2022
01:15
10/10/2022
03:30
2.25 SLOT, PLUG BHAH P PJSM, P/U YELLOWJACKET
CLEANOUT ASSEMBLY AS PER
YELLOWJACKET REP TO 322' MD.
MONITOR DISP VIA TT.
0.0 322.0
10/10/2022
03:30
10/10/2022
04:45
1.25 SLOT, PLUG TRIP P RIH W/ CLEANOUT ASSEMBLY FROM
322' MD TO 3,918' MD. MONITOR
DISP VIA TT.
322.0 3,918.0
10/10/2022
04:45
10/10/2022
05:00
0.25 SLOT, PLUG WASH P WASH AND REAM DN F/ 3,918' MD TO
3,984' MD W/ 405 GPM, 1063 PSI, 51%
F/O, 30 RPM, 1K TQ, ROT WT - 102K
3,918.0 3,984.0
10/10/2022
05:00
10/10/2022
06:30
1.50 SLOT, PLUG WASH P PUMP 10 BBL LOW 10 BBL HIGH VIS
SWEEP WHILE ROT AND RECIP PIPE
FROM 3,984' MD TO 3,920' MD W/ 405
GPM, 1067 PSI, 47% F/O, 30 RPM, 1K
TQ, P/U WT - 96K, SO WT - 102 WHILE
AT RATE. TOTAL STKS PUMPED -
6751. NOTHING NOTE WORTHY ON
SHAKERS AT B/U.
3,984.0 3,984.0
10/10/2022
06:30
10/10/2022
07:30
1.00 SLOT, PLUG SQEZ P SPOT 20 BBL FRESH WATER AT
PERFS AT 3,980' MD @ 168 GPM, 460
PSI, 31% F/O. CLOSE UPPER RAMS,
SQUEEZE WATER AT 4 SPM,
PRESSURE UP TO 440. SHUT IN AND
OBSERVE BLEED DOWN TO 370
OVER 25 MIN. BLEED OFF
PRESSURE.
3,984.0 3,984.0
10/10/2022
07:30
10/10/2022
08:15
0.75 SLOT, PLUG WASH P PUMP 10 BBL LOW 10 BBL HIGH VIS
SWEEP WHILE ROT AND RECIP PIPE
FROM 3984' MD TO 3,920' MD W/ 405
GPM, 1061 PSI, 46% F/O, 30 RPM, 1K
TQ, P/U WT - 96K, SO WT - 102 WHILE
AT RATE. TOTAL STKS PUMPED -
2741. NOTHING NOTE WORTHY ON
SHAKERS AT B/U.
3,984.0 3,984.0
10/10/2022
08:15
10/10/2022
08:30
0.25 SLOT, PLUG OWFF P OWFF (STATIC) 3,984.0 3,984.0
10/10/2022
08:30
10/10/2022
10:15
1.75 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,984' MD
TO 330' MD. UP WT - 101K.
MONITOR DISP VIA TT.
3,984.0 330.0
10/10/2022
10:15
10/10/2022
11:30
1.25 SLOT, PLUG BHAH P L/D BHA F/ 330' MD AS PER
YELLOWJACKET REP. MONITOR
DISP VIA TT.
330.0 0.0
10/10/2022
11:30
10/10/2022
13:00
1.50 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR,
SIMOPS - P/U DOYON CSG 3½
HANDLING EQUIPMENT
0.0 0.0
10/10/2022
13:00
10/10/2022
15:30
2.50 SLOT, PLUG PUTB P PJSM, M/U AND RIH W/ 30 JTS OF 3½
H563 12.7# L-80 CEMENT STRINGER
ASSEMBLY TO 927' MD. MONITOR
DISP VIA TT.
0.0 927.0
10/10/2022
15:30
10/10/2022
16:45
1.25 SLOT, PLUG TRIP P RIH W/ CEMENT STRINGER
ASSEMBLY ON 4" DP F/ 927' MD TO
3,950' MD. MONITOR DISP VIA TT.
S/O WT - 92K.
927.0 3,950.0
10/10/2022
16:45
10/10/2022
17:15
0.50 SLOT, PLUG PULD P P/U WORKING 4" SINGLE AND 5' PUP
JT AND TAG TOC @ 3,988' MD W/ 5K.
L/D PUP JT
3,950.0 3,982.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 19/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/10/2022
17:15
10/10/2022
17:30
0.25 SLOT, PLUG RURD P P/U AND M/U CEMENT SWIVEL. RIH
F/ 3,982' MD TO 3,987' MD.
3,982.0 3,987.0
10/10/2022
17:30
10/10/2022
18:45
1.25 SLOT, PLUG CMNT P PT LINES TO 500 LOW, 2000 HIGH
(GOOD). PUMP 14 BBLS OF 13.5 PPG
MUD PUSH @ 4 BPM, 220 PSI, 30%
F/O. PUMP 30 BBLS 15.8 PPG CLASS
G CEMENT @ 4 BPM, 70 PSI, 21%
F/O. CHASE CEMENT W/ 6 BBL OF
13.5 MUD PUSH @ 4 BPM, 30 PSI,
21% F/O. CHASE W/ 18 BBLS OF 9.8
BRINE @ 4 BPM, 30 PSI, 27% F/O.
SLOW RATE TO 2 BPM, PUMP 5 BBLS
OF 9.8 BRINE W/ 6 PSI, 22% F/O. CIP
@ 18:40. CEMENT WET @ 18:07.
ROT STRING @ 20 RPM, 1K TQ
DURING JOB.
3,987.0 3,987.0
10/10/2022
18:45
10/10/2022
19:00
0.25 SLOT, PLUG RURD P R/D CEMENTERS AND CEMENT
SWIVEL.
3,987.0 3,987.0
10/10/2022
19:00
10/10/2022
19:30
0.50 SLOT, PLUG TRIP P POOH F/ 3,987' MD, LAYING DOWN
WORKING SINGLE, TO 3,193' MD @
45 FT/MIN. MONITOR DISP VIA TT.
3,987.0 3,193.0
10/10/2022
19:30
10/10/2022
20:15
0.75 SLOT, PLUG CIRC P PUMP DOWN FOAM WIPER BALL AT
250 GPM, 262 PSI, 47% F/O WHILE
ROT AND RECIP PIPE FROM 3,193'
MD TO 3,102' MD. OBSERVE MUD
PUSH AND TRACES OF CEMENT TO
SURFACE AT BOTTOMS UP. DUMP
TO THE ROCK. 47 BBLS TOTAL.
1994 TOTAL STKS PUMPED.
3,193.0 3,193.0
10/10/2022
20:15
10/11/2022
00:00
3.75 SLOT, PLUG SQEZ P PERFORM HESITATION SQUEEZE.
CLOSE ANNULAR. PUMP DN STRING
@ .5 SPM, PRESSURE UP TO 750 IN 8
STKS. SHUT IN AND MONITOR.
OBSERVE PSI BLEED TO 617 IN 17
MIN. PRESSURE BACK UP TO 770 W/
1 ADDITIONAL STKS. OBSERVE PSI
DROP TO 658 IN 25 MIN. BLEED PSI
TO 0. OBSERVE 3 BBLS BLED BACK
TO THE TRIP TANK. PRESSURE
BACK UP TO 850 W/ 16 STKS.
OBSERVE PSI DROP TO 759 IN 20
MIN. PRESSURE BACK UP TO 870
PSI. OBSERVE PSI DROP TO 818 IN
17 MIN. PRESSURE BACK UP TO 930
PSI. OBSERVE PRESSURE DROP TO
842 IN 33 MIN. DECISION MADE TO.
LEAVE SHUT IN TIL 00:30 HRS ON
10/11/22
3,193.0 3,193.0
10/11/2022
00:00
10/11/2022
00:30
0.50 SLOT, PLUG SQEZ P OBSERVE PSI DROP TO 619 PSI. (138
MIN HELD - 311 PSI BLED OFF
TOTAL) BLEED OFF PSI TO TT.
OBSERVE 1 BBL BLED BACK. OPEN
ANNULAR.
3,193.0 3,193.0
10/11/2022
00:30
10/11/2022
01:00
0.50 SLOT, PLUG CIRC P ROT AND RECIP PIPE F/ 3,193' MD T/
3,098' MD W/ 250 GPM, 280 PSI, 38%
F/O, 30 RPM, 1K TQ, UP WT - 76K, S/O
WT - 72K, ROT WT - 79K TOTAL STKS
PUMPED - 950
3,193.0 3,193.0
10/11/2022
01:00
10/11/2022
01:15
0.25 SLOT, PLUG OWFF P OWFF (STATIC) 3,193.0 3,193.0
10/11/2022
01:15
10/11/2022
02:00
0.75 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,193' MD T/
927' MD. MONITOR DISP VIA TT.
3,193.0 927.0
10/11/2022
02:00
10/11/2022
02:15
0.25 SLOT, PLUG SFTY P PJSM, SWAP OUT HANDLING
EQUIPMENT TO 3½.
927.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 20/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/11/2022
02:15
10/11/2022
03:00
0.75 SLOT, PLUG TRIP P RACK BACK IN THE DERRICK 3½
H563 CEMENT STRINGER ASSEMBLY
F/ 927' MD. MONITOR DISP VIA TT.
927.0 0.0
10/11/2022
03:00
10/11/2022
04:00
1.00 SLOT, PLUG WWWH P M/U STACK FLUSHING TOOL AND
FLUSH SWARF AND CEMENT FROM
BOPE @ 800 GPM. B/D TOP DRIVE.
0.0 0.0
10/11/2022
04:00
10/11/2022
04:45
0.75 SLOT, PLUG RURD P PULL WEAR BUSHING AND INSTALL
TEST PLUG AS PER FMC
0.0 0.0
10/11/2022
04:45
10/11/2022
07:30
2.75 SLOT, WHDBOP RURD P R/U TO TEST BOPE. M/U XT-39
FLOOR VALVES AND DART. INSTALL
TEST SUB ON TOP DRIVE. FLOOD
STACK AND SURFACE EQUIPMENT
WITH WATER. SHELL TEST BOPE.
(GOOD).
0.0 0.0
10/11/2022
07:30
10/11/2022
12:00
4.50 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW
4,200 HIGH FOR 5 CHARTED MIN. W/
EXCEPTION OF
MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI FOR 5 CHARTED MIN,
W/ 4" TEST JT TEST ANNULAR T/
3500 PSI, 3.5" X 6" UPR, 3.5" X 6" LPR,
W/ 3 1/2" TEST JT
TEST 3.5" X 6" UPR & 3.5" X 6" LPR,
TEST CHOKE VALVES 1-15, MANUAL
OPERATED & SUPER CHOKE,
CHOKE & KILL MANUALS & HCR'S, 4"
VALVE ON KILL LINE, 4" FOSV, 4"
DART VALVE, UPPER & LOWER IBOP;
BLIND/ SHEAR RAMS; PERFORM
KOOMEY DRAWDOWN, ACC = 3050
PSI. MANIF. = 1550 PSI. ACC = 1750
PSI AFTER ALL FUNCTIONS ON
BOTTLES, 9 SEC FOR 200 PSI. BUILD
W/ 2 ELEC. PUMPS, 70 SEC T/ BUILD
FULL SYS. PRESSURE W/ 2 ELEC. &
2 AIR PUMPS, CLOSING TIMES
ANNULAR =7 SEC. UPR = 7 SEC.
BLIND / SHEARS = 7 SEC. LPR = 7
SEC. CHOKE HCR = 2 SEC. KILL HCR
= 2 SEC; NITROGEN BACKUP SIX
BOTTLE AVE = 2000 PSI. TEST PVT
GAIN/LOSS AND FLOW OUT ALARMS,
TEST LEL AND H2S ALARMS; AOGCC
REP KAM ST. JOHN WAIVED
WITNESS.
0.0 0.0
10/11/2022
12:00
10/11/2022
15:00
3.00 SLOT, PERF RURD T R/D TESTING EQUIPMENT, ATTEMPT
TO PULL TEST PLUG PER FMC REP.
COULD NOT
PULL FREE WITH THE TUGGER, FMC
DIRECTED TO USE TOP DRIVE
PULLED 20K ON ELEVATORS OVER
PULL, CONTACTED TOOL PUSHER &
CPAI REP. L/D TEST JT, M/U 4"
DOUBLE TO NC50 X-OVER, M/U
DOUBLE T/ TEST PLUG & KELLY UP
W/ TOP DRIVE, PULL 30K STRAIGHT
PULL NO SUCCESS, APPLY 10K TQ
W/ 5K PULL NO SUCCESS, REPEAT
PROCESS MULTIPLE TIMES NO
SUCCESS. S/O 10K WOB THEN
ATTEMPT 30K STRAIGHT PULL NO
SUCCESS. STOP THE JOB FMC/CPAI
CONTACT TOWN.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 21/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/11/2022
15:00
10/11/2022
16:30
1.50 SLOT, PERF RURD T STAGE SUPER SUCKER @ BEAVER
SLIDE & RUN HOSE T/ RIG FLOOR T/
SUCK OUT STACK, ONCE STACK
EMPTIED, PULL LOCKDOWN SCREW
PER FMC REP, VERIFIED CORRECT
TEST PLUG, PULL 3 MORE
LOCKDOWNS & FLUSH PROFILE W/
FRESH WATER, RE-INSTALL
LOCKDOWN SCREWS
0.0 0.0
10/11/2022
16:30
10/11/2022
17:30
1.00 SLOT, PERF PULD T HEAT WELL VIA STEAM, PULL 30K
OVERPULL NO SUCCESS, PULL
DOUBLE F/ TEST PLUG, P/U
WORKING SINGLE AND BOOT
BASKETS, MAGNETS & BIT PER
YELLOW JACKET REP.
0.0 0.0
10/11/2022
17:30
10/11/2022
18:30
1.00 SLOT, PERF WWWH T RIH TO TOP OF PLUG. CIRC AT 411
GPM, 160 PSI, 48% F/O, 16 RPM.
1827 TOTAL STKS. L/D BHA AND
WORKING SINGLE.
0.0 0.0
10/11/2022
18:30
10/11/2022
21:30
3.00 SLOT, PERF RURD T EMPTY STACK. BOLDS AND
INSPECT. PRESSURE WASH INTO
PORTS OF LDS. ADD OIL TO TOP
AND BOTTOM OF TEST PLUG.
ATTEMPT TO PULL
(UNSUCCESSFUL)
0.0 0.0
10/11/2022
21:30
10/11/2022
23:00
1.50 SLOT, PERF PULD T L/D 4" PULLING ASSEMBLY AND M/U
5" HWDP. ATTEMPT TO TO PULL W/
30K OVER, 10K TQ, AND 20K DN WT.
(UNSUCCESSFUL).
0.0 0.0
10/11/2022
23:00
10/12/2022
00:00
1.00 SLOT, PERF RURD T DECISION MADE TO APPLY STEAM
TO TUBING SPOOL AND INTO THE
OPENINGS OF THE LDS.
0.0 0.0
10/12/2022
00:00
10/12/2022
00:30
0.50 SLOT, PERF RURD T CONTINUE WITH APPLYING STEAM.
R/U EZ TQ AND TUGGER TO 5" HWDP
IN THE HOLE AND WORK BACK AND
FORTH AND SUCCESSFULLY WORK
THE TEST PLUG FROM WELLHEAD.
0.0 0.0
10/12/2022
00:30
10/12/2022
01:30
1.00 SLOT, PERF RURD T L/D 2 JTS HWDP. INSPECT TEST
PLUG. RE-INSTALL LDS. SIMOP -
INSPECT TD. CLEAR AND CLEAN RIG
FLOOR.
0.0 0.0
10/12/2022
01:30
10/12/2022
02:00
0.50 SLOT, PERF RURD T M/U 2 JTS & STACK FLUSHING TOOL.
FUNCTION TEST ANNULAR, UPPER
RAMS, BLIND/SHEAR RAMS, AND
LOWER RAMS.
0.0 0.0
10/12/2022
02:00
10/12/2022
02:45
0.75 SLOT, PERF WWWH T FLUSH STACK W/ 888 GPM, 50 PSI,
60% F/O, 15 RPM.
0.0 0.0
10/12/2022
02:45
10/12/2022
03:30
0.75 SLOT, PERF RURD T L/D 2 JTS & STACK FLUSHING TOOL.
B/D TD. DRAIN STACK. PREP NEW
TEST PLUG TO INSTALL. REMOVE
BIT FROM CLEAN OUT ASSEMBLY
USED FOR WASHING STACK.
0.0 0.0
10/12/2022
03:30
10/12/2022
04:30
1.00 SLOT, PERF RURD T B/D AND FLUSH MUD LINE. PREP TO
SET PLUG AND TEST UPPER LOCK
DOWN SCREWS. SIMOPS - MOBILIZE
BAKER BHA TO THE RIG FLOOR FOR
TAGING CEMENT.
0.0 0.0
10/12/2022
04:30
10/12/2022
05:00
0.50 SLOT, PERF PRTS T INSTALL SPARE TEST PLUG. FLOOD
LINES AND CLOSE BLINDS. TEST
UPPER LDS TO 250 LOW 4200 HIGH
F/ 5/5 CHARTED MIN (GOOD).
0.0 0.0
10/12/2022
05:00
10/12/2022
06:00
1.00 SLOT, PERF RURD P PULL TEST PLUG AND INSTALL 9" ID
WEAR BUSHING PER FMC. SIMOPS -
BLOW DOWN TESTING EQUIPMENT.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 22/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/12/2022
06:00
10/12/2022
06:30
0.50 SLOT, PERF BHAH P HOLD PJSM/ M/U PIPE TALLY ON RIH
W/ 6-1/8" BIT AND 7" SCRAPER BHA.
0.0 0.0
10/12/2022
06:30
10/12/2022
08:00
1.50 SLOT, PERF TRIP P RIH/ 6 1/8" BIT/ SCRAPER BHA F/
SURFACE T/ 3,147' MD, P/U WT=96K,
S/O WT= 95K.
0.0 3,147.0
10/12/2022
08:00
10/12/2022
08:15
0.25 SLOT, PERF WASH P KELLY UP T/ STD #33, ROT./RECIP. F/
3,132' MD T/ 3,041' MD, WHILE
CIRCULATING B/U @ 6
BPM, 430 PSI, 34% F/O, 30 RPM, 1K
TQ, P/U RT WT= 79K S/O RT WT=
85K. 700 STROKES
3,041.0 3,132.0
10/12/2022
08:15
10/12/2022
09:00
0.75 SLOT, PERF WASH P KELLY UP T/ STAND #34, WASH
DOWN @ 2BPM, 86K S/O, 26% F/O, F/
3,136' TO TAG 10K
WOB TOC @ 3,216' MD, INCREASE
PUMP RATE T/ 6 BPM, ROTATE @ 30
RPM TO CLEAN HOLE
3,136.0 3,216.0
10/12/2022
09:00
10/12/2022
10:00
1.00 SLOT, PERF PRTS P R/U & TEST CEMENT T/ 1500 PSI
PRIOR TO AOGCC REP. KAM
ST.JOHN WITNESS.
3,216.0 3,216.0
10/12/2022
10:00
10/12/2022
11:00
1.00 SLOT, PERF PRTS P R/U & TEST CEMENT T/ 1500 PSI
AOGCC REP. KAM ST.JOHN
WITNESS. BLEED OFF TEST &
CHANGE RIG UP OFF OF MUD
MANIFOLD INSTESD OF CEMENT
LINE ABOVE WIND WALLS
TO ELIMINATE TEMPERATURE
SWING ON TEST
3,216.0 3,216.0
10/12/2022
11:00
10/12/2022
12:00
1.00 SLOT, PERF PRTS P TEST CEMENT T/ 1500 PSI AOGCC
REP. KAM ST.JOHN WITNESS FOR 30
MIN. (CHARTED).
3,216.0 3,216.0
10/12/2022
12:00
10/12/2022
12:30
0.50 SLOT, PERF RURD P R/D TESTING EQUIPMENT, KELLY UP
& TAG TOC 10K WOB @ 3,216' MD
AOGCC REP. KAM
ST.JOHN WITNESSED.
3,216.0 3,216.0
10/12/2022
12:30
10/12/2022
12:45
0.25 SLOT, PERF OWFF P OWFF (STATIC), B/D TD 3,216.0 3,216.0
10/12/2022
12:45
10/12/2022
14:00
1.25 SLOT, PERF TRIP P POOH F/ 3,137,' P/U WT 83K, T/
SURFACE, L/D SCRAPER ASSEMBLY
PER BAKER REP
3,217.0 0.0
10/12/2022
14:00
10/12/2022
14:30
0.50 SLOT, PERF SFTY P PJSM, M/U BRIDGE PLUG PER
BAKER REP.,
0.0 0.0
10/12/2022
14:30
10/12/2022
18:30
4.00 SLOT, PERF TRIP P RIH W/ BRIDGE PLUG F/ SURFACE T/
3,118 MONITORING DISPLACEMENT
VIA T.T., FILLING
PIPE EVERY 20 STDS
0.0 3,118.0
10/12/2022
18:30
10/12/2022
19:00
0.50 SLOT, PERF PACK P SET BRIDGE PLUG AS PER BAKER
REP. TOP OF BRIDGE PLUG 3,118' /
BOTTOM OF BRIDGE PLUG 3,119'
3,118.0 3,118.0
10/12/2022
19:00
10/12/2022
19:45
0.75 SLOT, PERF RURD P P/U T/ 3,101' MD, L/D TOP SINGLE OF
STD 33, R/U TO TEST BRIDGE PLUG
3,118.0 3,101.0
10/12/2022
19:45
10/12/2022
21:00
1.25 SLOT, PERF PRTS P TEST BRIDGE PLUG T/ 2500 PSI FOR
30 MINUTES (CHARTED).
3,101.0 3,101.0
10/12/2022
21:00
10/12/2022
21:15
0.25 SLOT, PERF RURD P RIG DOWN TEST EQUIPMENT,
CLEAN AND CLEAR RIG FLOOR,
PREP FOR TRIP OUT OF
HOLE
3,101.0 3,101.0
10/12/2022
21:15
10/12/2022
22:30
1.25 SLOT, PERF TRIP P POOH F/3,101' T/0' PUW=83K,
MONITOR HOLE FILL VIA T.T
3,101.0 0.0
10/12/2022
22:30
10/12/2022
23:30
1.00 SLOT, PERF RURD P L/D BAKER RUNNING TOOL, CLEAN
AND CLEAR RIG FLOOR, PREP FOR
UPCOMING GUN
RUN
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 23/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/12/2022
23:30
10/13/2022
00:00
0.50 SLOT, PERF RURD P MOBILIZE GUNS AND FIRING HEAD,
PJSM
0.0 0.0
10/13/2022
00:00
10/13/2022
01:30
1.50 SLOT, PERF TRIP P RIH F/0 T/3,070', SOW=85K, MONITOR
DISPLACEMENT VIA T.T
0.0 3,070.0
10/13/2022
01:30
10/13/2022
01:45
0.25 SLOT, PERF PERF P SPACE OUT AS PER CO MAN, PUMP
DOWN 5/8" STEEL BALL AS PER REP
@ 1BPM, 30 STKS
2386 PSI, "GUNS FIRED" TOP OF
PERFS 3,028' / BOTTOM PERFS
3,070'
3,070.0 3,070.0
10/13/2022
01:45
10/13/2022
03:00
1.25 SLOT, PERF CIRC P CIRCULATE @ 1 BPM, 1473 PSI, 757
TOTAL STKS. NO GAS OR ANYTHING
NOTE WORTHY ON B/U.
3,070.0 3,070.0
10/13/2022
03:00
10/13/2022
03:30
0.50 SLOT, PERF OWFF P OWFF = 30 MIN (STATIC) 3,070.0 3,070.0
10/13/2022
03:30
10/13/2022
04:45
1.25 SLOT, PERF TRIP P POOH F/3,070' T/0', PUW=86K,
MONITOR HOLE FILL VIA T.T
3,070.0 0.0
10/13/2022
04:45
10/13/2022
05:30
0.75 SLOT, PERF BHAH P INSPECT TCP GUNS. ALL 840 SHOTS
FIRED. L/D GUNS TO PIPE SHED.
CLEAN AND CLEAR FLOOR.
0.0 0.0
10/13/2022
05:30
10/13/2022
06:45
1.25 SLOT, PERF BHAH P M/U YELLOW JACKET 6-1/8"
MILL/CLEAN OUT BHA T/151'
0.0 151.0
10/13/2022
06:45
10/13/2022
07:45
1.00 SLOT, PERF TRIP P RIH W/CLEAN OUT BHA F/151'
T/3,118'. SOW=90K, MONITOR HOLE
FILL VIA T.T
151.0 3,118.0
10/13/2022
07:45
10/13/2022
08:30
0.75 SLOT, PERF CIRC P TAG BRIDGE PLUG W/10 K WOB.
CIRC 3XB/U W/250 GPM, 466 PSI,
RECIPROCATE PIPE 30'. ROT = 83K.
SAW SIGNIFICANT AMOUNTS OF
GUN DEBRIS ON B/U.
3,118.0 3,118.0
10/13/2022
08:30
10/13/2022
09:00
0.50 SLOT, PERF LOT P SPACE OUT IN BOPE. SHUT IN ON
UPPER RAMS. ATTEMPT TO CIRC UP
OA WITH NO SUCCESS. PERFORM
LOT ON LOWER HALO. PUMP .5 BBL
MIN AND OBSERVE BREAK OVER AT
494 PSI / 12.94 PPG EMW. INJECT 2
BBLS PAST BREAK OVER .5 BPM AT
400 PSI / 12.34 PPG EMW
INJECTIVITY.
3,118.0 3,118.0
10/13/2022
09:00
10/13/2022
09:15
0.25 SLOT, PERF CIRC P CIRC B/U W/250 GPM, 450 PSI.
NOTHING NOTE WORTHY ON B/U
3,118.0 3,118.0
10/13/2022
09:15
10/13/2022
09:30
0.25 SLOT, PERF OWFF P OWFF (STATIC) SIMOPS - BLOW
DOWN TOP DRIVE AND PREP RIG
FLOOR TO POOH.
3,118.0 3,118.0
10/13/2022
09:30
10/13/2022
10:45
1.25 SLOT, PERF TRIP P POOH F/3,118' T/151', PUW=87K,
MONITOR HOLE FILL VIA T.T
3,118.0 151.0
10/13/2022
10:45
10/13/2022
11:30
0.75 SLOT, PERF BHAH P RACK BACK DC'S. INSPECT BHA.
GUN DEBRIS ON MAGNETS AND
NOTHING IN BOOT BASKETS. L/D
YELLOW JACKET BHA TO PIPE
SHED.
151.0 0.0
10/13/2022
11:30
10/13/2022
12:00
0.50 SLOT, PERF BHAH P CLEAN AND CLEAR FLOOR 0.0 0.0
10/13/2022
12:00
10/13/2022
15:00
3.00 SLOT, PERF SVRG P SERVICE RIG. PM'S ON DRAW
WORKS AND TOP DRIVE. SIMOPS -
SLIP AND CUT DRILL LINE.
CEMENTING PLAN FORWARD BEING
WORKED IN THE BACK GROUND. 3
WRAPS 44'
0.0 0.0
10/13/2022
15:00
10/13/2022
17:15
2.25 SLOT, PERF SVRG P CHANGE OUT TOP DRIVE SHOT PIN
ASSEMBLEY.
0.0 0.0
10/13/2022
17:15
10/13/2022
17:30
0.25 SLOT, PERF RURD P R/U DDI CSG TONGS AND
ELEVATORS
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 24/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/13/2022
17:30
10/13/2022
19:00
1.50 SLOT, PERF PUTB P M/U 3.5' MULE SHOE AND RIH W/ 3.5"
TUBING AS PER DDI CSG. F/
SURFACE T/ 927' MD. S/O
60K MONITOR DISP. VIA TT.
0.0 927.0
10/13/2022
19:00
10/13/2022
21:00
2.00 SLOT, PERF TRIP P INSTALL XO'S AND RIH OUT OF
DERRICK W/ 4" DP F/ 927' MD T/ 3113'
MD P/U 79K, S/O 81K.
MONITOR DISP. VIA TT.
927.0 3,113.0
10/13/2022
21:00
10/13/2022
21:30
0.50 SLOT, PERF RURD P M/U CEMENT SWIVEL AND CEMENT
LINE
3,113.0 3,113.0
10/13/2022
21:30
10/13/2022
22:00
0.50 SLOT, PERF CIRC P CIRCULATE @ 250 GPM, 375 PSI, 20
RPM, 1K TQ, 390 TOTAL STKS,
FLOOD LINE FROM
CEMENTERS, PT LINE TO 2300 PSI,
PJSM WITH CEMENT AND RIG CREW
3,113.0 3,113.0
10/13/2022
22:00
10/13/2022
22:30
0.50 SLOT, PERF CMNT P BATCH UP CEMENT AND MUD PUSH 3,113.0 3,113.0
10/13/2022
22:30
10/13/2022
23:00
0.50 SLOT, PERF CMNT P PUMP CEMENT AS PER PLAN
FORWARD
14 BBL, 13.5 PPG MUD PUSH @ 4
BPM
21 BBL, 15.8 PPG CLASS G CEMENT
@ 4 BPM
6 BBL, 13.5 PPG MUD PUSH @ 4 BPM
12 BBL, 9.8 PPG BRINE @ 4 BPM
5.2, BBL 9.8 BRINE @ 2 BPM
NO LOSSES AND ROTATED
THROUGHOUT CEMENT JOB
3,113.0 3,113.0
10/13/2022
23:00
10/13/2022
23:30
0.50 SLOT, PERF TRIP P POOH F/3,113' T/2,530' PUW=76K,
MONITOR HOLE FILL VIA T.T
3,113.0 2,530.0
10/13/2022
23:30
10/14/2022
00:00
0.50 SLOT, PERF CIRC P CIRC & RECIP, F/2,530' T/2,435', @
250 GPM, 198 PSI, 30 RPM, 1 K TQ, 36
% F.O, PUMP DOWN
FOAM WIPER BALL AND CIRCULATE
UNTIL CLEAN AT SHAKERS, DUMP 54
BBL MUD PUSH AND CONTAMINATED
BRINE. (NO CEMENT OBSERVED AT
SURFACE)
2,530.0 2,435.0
10/14/2022
00:00
10/14/2022
01:15
1.25 SLOT, PERF SQEZ P PERFORM LOWER HALO CEMENT
SQUEEZE, SPACE OUT, SHUT
ANNULAR, PUMP DOWN DRILL
STRING TO SQUEEZE CEMENT,
PRESSURE UP TO 250PSI W/ 5 STKS,
BLEED OFF TO 127 PSI IN
15 MIN, CON'T TO KEEP PRESSURE
@300 PSI, 1.3 BBLS, 13 TOTAL STKS,
.5 BBL BLEED BACK TO T.T. .8 BBLS
CEMENT TOTAL SQUEEZED INTO
PERF'S.
2,530.0 2,530.0
10/14/2022
01:15
10/14/2022
01:45
0.50 SLOT, PERF CIRC P CIRC & RECIP F/2,530' T/2,440', 250
GPM, 217 PSI, 30 RPM, 1K TQ, 35%
F.O
2,530.0 2,435.0
10/14/2022
01:45
10/14/2022
02:00
0.25 SLOT, PERF OWFF P OWFF (STATIC) SIMOPS - B/D TOP
DRIVE
2,435.0 2,435.0
10/14/2022
02:00
10/14/2022
02:45
0.75 SLOT, PERF TRIP P POOH F/2,530' T/927', PUW=73K,
MONITOR HOLE FILL VIA T.T
2,530.0 927.0
10/14/2022
02:45
10/14/2022
03:00
0.25 SLOT, PERF RURD P PJSM, SWAP HANDLING EQUIPMENT,
RIG UP CASING TONGS
927.0 927.0
10/14/2022
03:00
10/14/2022
03:30
0.50 SLOT, PERF TRIP P POOH/ F927' T/0 RACKING BACK 3
1/2" TUBING IN DERRICK
927.0 0.0
10/14/2022
03:30
10/14/2022
06:00
2.50 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS -
CLEAN AND CLEAR FLOOR, HOUSE
KEEPING, WORK ORDERS, P.M.'S,
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 25/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/14/2022
06:00
10/14/2022
12:00
6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS -
CLEAN AND CLEAR FLOOR, HOUSE
KEEPING, WORK ORDERS, P.M.'S,
SIMOPS OFFLOAD BRINE TO TANK
FARM. CLEAN PITS AND PREP FOR
LSND. MP2 ON KOOMEY. FILL BULK
HYD. TANK ON RIG FLOOR. MP2 ON
MUD PUMPS. BRING
MPD BEARING SPOOL TO BOP DECK
AND STAGE
0.0 0.0
10/14/2022
12:00
10/14/2022
18:00
6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS -
CLEAN AND CLEAR FLOOR, HOUSE
KEEPING, WORK ORDERS, P.M.'S,
ONLOAD LSND MUD FROM TANK
FARM INTO PITS 1-5.
INSPECT RIG FLOOR KILL LINE
DEMCO VALVE. PT VALVE T/ 3500
PSI. NO LEAKS. MP2 ON
CENTRIFUGE AND DEGASSER.
HOUSEKEEPING ON RIG FLOOR
0.0 0.0
10/14/2022
18:00
10/15/2022
00:00
6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS -
CLEAN AND CLEAR FLOOR, HOUSE
KEEPING, WORK ORDERS, P.M.'S,
0.0 0.0
10/15/2022
00:00
10/15/2022
00:30
0.50 SLOT, PERF SFTY P PJSM MAKE UP BAKER 7" SCRAPER
CLEAN OUT ASSY AS PER BAKER TO
19'
0.0 19.0
10/15/2022
00:30
10/15/2022
01:30
1.00 SLOT, PERF TRIP P TIH F/19' TO 2568' S/O 81K 19.0 2,568.0
10/15/2022
01:30
10/15/2022
02:00
0.50 SLOT, PERF CIRC P CIRCULATING B/U F/ 2568' TO 2475'
MD GPM 250 PSI 366 FLOW OUT 37%
RPM 30 TQ 1K P/U 73K S/O 78K RT
WT 78 K
2,568.0 2,475.0
10/15/2022
02:00
10/15/2022
02:45
0.75 SLOT, PERF WASH P WASH DOWN F/ 2568' TO 2632' TAG
TOP CEMENT WITH 10K GPM 85 PSI
176 FLOW OUT 25%
2,568.0 2,632.0
10/15/2022
02:45
10/15/2022
03:30
0.75 SLOT, PERF WASH P WASH AND REAM CEMENT FROM
2632' TO 2700' OBSERVE CEMENT
COMING SHAKERS SOFT AND
MUSHY GPM 250 PSI 366 FLOW OUT
37% RPM 30 TQ 1K P/U 73K S/O 78K
RT WT 78 K
2,568.0 2,700.0
10/15/2022
03:30
10/15/2022
04:00
0.50 SLOT, PERF CIRC P CIRC ROT AND RECIP F/ 2700' TO
2670' GPM 250 PSI 366 FLOW OUT
37% RPM 30 TQ 1K P/U 73K S/O 78K
RT WT 78 K
2,700.0 2,700.0
10/15/2022
04:00
10/15/2022
04:15
0.25 SLOT, PERF TRIP P TOOH F/2700' TO 2377' P/U 76K
MONTIORING HNOLE FILL AT TRIP
TANK
2,700.0 2,377.0
10/15/2022
04:15
10/15/2022
06:00
1.75 SLOT, PERF CIRC P CIRCULATE @ 85 GPM 80 PSI
WAITING ON CEMENT.
2,377.0 2,377.0
10/15/2022
06:00
10/15/2022
07:00
1.00 SLOT, PERF CIRC P RIH F/ 2377' T/ 2700', TAG CEMENT
AGAIN W/12 K WOB. GPM = 85, PSI =
142, SET 12K DOWN. SOW =
81K, PUW = 76K
2,377.0 2,700.0
10/15/2022
07:00
10/15/2022
09:15
2.25 SLOT, PERF DRLG P DRILL CEMENT F/ 2700' T/ 2800', WOB
= 8K, GPM = 254, PSI = 425, RPM =
30, TQ = 1-2K,
FLOW OUT= 40%, P/U WT= 81K, S/O
WT= 76K, RT WT= 78K. OBSERVE
HARD CEMENT CUTTINGS ACROSS
SHAKERS.
2,700.0 2,800.0
10/15/2022
09:15
10/15/2022
09:30
0.25 SLOT, PERF CIRC P CBU @ 254 GPM, 425 PSI, 30 RPM, 1-
2K TQ, 40% F/O. 755 STKS PUMPED
2,800.0 2,800.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 26/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/15/2022
09:30
10/15/2022
09:45
0.25 SLOT, PERF TRIP P TAG CEMENT @ 2800' MD 10K WOB.
TAG WITNESS BY AOGCC REP. KAM
ST. JOHN
2,800.0 2,800.0
10/15/2022
09:45
10/15/2022
10:15
0.50 SLOT, PERF DISP P DISP. WELL TO LSND 9.8PPG 255
GPM, 358 PSI, 30 RPM, 1K TQ, 35%
F/O.
2,800.0 2,800.0
10/15/2022
10:15
10/15/2022
10:45
0.50 SLOT, PERF RURD P B/D TD R/U TO TEST CEMENT 2,800.0 2,800.0
10/15/2022
10:45
10/15/2022
11:30
0.75 SLOT, PERF PRTS P TEST CEMENT T/ 1500 PSI, 31 STKS
PUMPED, CHARTED F/ 30 MIN.BLED
BACK 2.8BBL TEST
WITNESSED BY AOGCC REP. KAM
ST. JOHN
2,800.0 2,800.0
10/15/2022
11:30
10/15/2022
12:00
0.50 SLOT, PERF RURD P R/D AND B/D TEST EQUIPMENT. LINE
UP FOR FLUID SWAP.
2,800.0 2,800.0
10/15/2022
12:00
10/15/2022
12:15
0.25 SLOT, PERF DISP P SWAP WELL BACK TO 9.8 PPG BRINE
@ 254 PSI, 556 PSI, 30 RPM, 1K TQ,
38% F/O.
2,800.0 2,800.0
10/15/2022
12:15
10/15/2022
12:30
0.25 SLOT, PERF OWFF P OWFF WELL STATIC 2,800.0 2,800.0
10/15/2022
12:30
10/15/2022
14:30
2.00 SLOT, PERF TRIP P POOH ON ELEVATOR RACKING
BACK. F/ 2800' MD T/ SURFACE. L/D
BAKER SCRAPER TOOL
IN SHED. P/U 81K @ 2800' MD
2,800.0 0.0
10/15/2022
14:30
10/15/2022
15:15
0.75 SLOT, PERF SFTY P CLEAN AND CLEAR RIG FLOOR.
PJSM ON RUNNING GUNS
0.0 0.0
10/15/2022
15:15
10/15/2022
15:30
0.25 SLOT, PERF BHAH P P/U M/U SLMB GUN ASSEMBLY. F/
SURFACE T/ 50' MD.
0.0 50.0
10/15/2022
15:30
10/15/2022
17:30
2.00 SLOT, PERF TRIP P RIH WITH GUNS ON 4" DP F/ 50 MD T/
2772' MD @ 90'/MIN DOPING PIN
END. S/O 81K. 80K P/U
50.0 2,772.0
10/15/2022
17:30
10/15/2022
17:45
0.25 SLOT, PERF PERF P DROP 5/8" BALL AS PER SLMB PUMP
@ 1BPM 65 STKS. GUNS FIRED @
2772' MD. (OA
PRESS. STAYED STABLE. TOP OF
PERF'S 2,730' / BOTTOM OF PERF'S
2,772'
2,772.0 2,772.0
10/15/2022
17:45
10/15/2022
18:45
1.00 SLOT, PERF CIRC P CIRCULATE B/U @ 1BPM, 1122 PSI -
994 PSI, 19% F/O. NO GAS
OBSERVED ON B/U.
2,772.0 2,772.0
10/15/2022
18:45
10/15/2022
19:30
0.75 SLOT, PERF OWFF P OWFF 30 MIN (STATIC) SIMOPS - L/D
PUP JT, P/U TOP JT OF DP, BLOW
DOWN TOP DRIVE
2,772.0 2,772.0
10/15/2022
19:30
10/15/2022
21:00
1.50 SLOT, PERF TRIP P POOH F/2769' T/0', PUW= 76K,
MONITOR HOLE FILL VIA T.T
2,769.0 0.0
10/15/2022
21:00
10/15/2022
21:15
0.25 SLOT, PERF RURD P CLEAN AND CLEAR RIG FLOOR, L/D
FIRING HEAD, SWAP ELEVATORS
PREP FOR CLEAN
OUT RUN
0.0 0.0
10/15/2022
21:15
10/15/2022
21:45
0.50 SLOT, PERF BHAH P M/U BAKER CLEAN OUT BHA AS PER
REP, RIH F/0' T/151'
0.0 151.0
10/15/2022
21:45
10/15/2022
23:00
1.25 SLOT, PERF TRIP P RIH F/151' T/2796', SOW=86K,
MONITOR DISPLACEMENT VIA T.T
151.0 2,796.0
10/15/2022
23:00
10/15/2022
23:45
0.75 SLOT, PERF CIRC P ATTEMPT TO BREAK CIRCULATION,
DRILL STRING PRESSURED UP TO
3412 PSI, BLEED
OFF AND BLOW DOWN ALL SURFACE
LINES, RIG UP CEMENT HOSE VIA
HEAD PIN TO DRILL
STRING, ATTEMPT TO CIRCULATE
UNSUCCESSFUL, RIG DOWN LINES,
BLOW DOWN, PREP FOR TRIP OUT
OF THE HOLE
2,796.0 2,796.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 27/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/15/2022
23:45
10/16/2022
00:00
0.25 SLOT, PERF OWFF P OWFF 15 MIN (STATIC) 2,796.0 2,796.0
10/16/2022
00:00
10/16/2022
01:45
1.75 SLOT, PERF TRIP P POOH W/ 4" DP F/2796' T/ 151', RACK
BACK IN DERRICK. MONITOR
DISPLACEMENT VIA T.T.
2,796.0 151.0
10/16/2022
01:45
10/16/2022
02:30
0.75 SLOT, PERF BHAH P LAY DOWN CLEANOUT BHA F/ 151' T/
0', INSPECT AND CLEAN. TAPERED
MILL PORTS "PACKED
OFF" WITH METAL DEBRIS
151.0 0.0
10/16/2022
02:30
10/16/2022
03:15
0.75 SLOT, PERF BHAH P MAKE UP CLEANOUT BHA F/ 0' T/
147', M/U STND OF 4" DP, RIH T/ 242'.
PUMP THRU BHA - GPM
= 200, PSI = 45. "CLEAR
0.0 242.0
10/16/2022
03:15
10/16/2022
06:00
2.75 SLOT, PERF TRIP P RIH W/ 4" DP F/ 242' T/ 2387', S/O WT
= xxK, BREAK CIRCULATION EVERY
10 STNDS, MONITOR
DISPLACEMENT VIA T.T.
242.0 2,387.0
10/16/2022
06:00
10/16/2022
06:45
0.75 SLOT, PERF TRIP P RIH W/ 4" DP F/ 2387' T/ 2696', S/O WT
= 81K, MONITOR DISPLACEMENT VIA
T.T
2,387.0 2,696.0
10/16/2022
06:45
10/16/2022
07:00
0.25 SLOT, PERF WASH P WASH F/ 2696' MD T/ 2800' MD @
2BPM, 128 PSI, TAGGING CEMENT.
STAGE UP T/ 250 GPM,
450 PSI, 30 RPM, 1K TQ, 36% F/O. 819
STKS PUMPED
2,696.0 2,800.0
10/16/2022
07:00
10/16/2022
07:30
0.50 SLOT, PERF OTHR P SPACE OUT @ 2792' MD SHUT
UPPER PIPE RAMS AND PERFORM
INJ. TEST. 1/2 BPM,
BREAKOVER @ 958 PSI, 12 STKS, 32
STKS TOTAL INJ. RATE 540 PSI @ 1/2
BPM. 2.6 BBL
BLED BACK. (NO COMMUNICATION
TO OA NOTICED)
2,792.0 2,792.0
10/16/2022
07:30
10/16/2022
08:30
1.00 SLOT, PERF CIRC P CBU @ 250 GPM, 450 PSI, 30 RPM, 1K
TQ, 36% F/O. 691 STKS PUMPED
2,792.0 2,792.0
10/16/2022
08:30
10/16/2022
09:00
0.50 SLOT, PERF OWFF P B/D TD, OWFF 15 MIN. 2,792.0 2,792.0
10/16/2022
09:00
10/16/2022
10:30
1.50 SLOT, PERF TRIP P POOH W/ 4" DP RACKING BACK ON
ELEVATORS F/ 2792' MD 147' MD. 81K
P/U. MONITOR
DISP. VIA TT.
2,792.0 147.0
10/16/2022
10:30
10/16/2022
12:00
1.50 SLOT, PERF BHAH P LAY DOWN YELLOWJACKET/BAKER
BHA F/ 147'MD SURFACE. CLEAN
SWARF FROM
MAGNETS
147.0 0.0
10/16/2022
12:00
10/16/2022
13:00
1.00 SLOT, PERF BHAH P CLEAN AND CLEAR RIG FLOOR, L/D
YELLOWJACKET/BAKER HANDLING
EPUIPMENT AND
TOOLS
0.0 0.0
10/16/2022
13:00
10/16/2022
13:30
0.50 SLOT, PERF TRIP P R/U DOYON CASING POWER TONGS,
M/U MULESHOE AND 3 1/2 TUBING
FROM SURFACE
TO 927' MD
0.0 927.0
10/16/2022
13:30
10/16/2022
15:00
1.50 SLOT, PERF TRIP P RIH ON 4" DP OUT OF DERRICK. F/
927' T/ 2800' (TAG CEMENT) MD
MONITOR DISP VIA TT.
S/O 76K.
927.0 2,800.0
10/16/2022
15:00
10/16/2022
15:45
0.75 SLOT, PERF TRIP P SPACE OUT @ 2799' MD P/U M/U
BAKER CEMENT SWIVEL. RIG UP
SLMB CEMENTERS.
ESTABLISH CIRC. RATES.
2,800.0 2,799.0
10/16/2022
15:45
10/16/2022
16:15
0.50 SLOT, PERF CMNT P FLOOD LINES PT LINES T/ 2000 PSI.
CHARTED. BATCH UP CEMENT
2,799.0 2,799.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 28/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/16/2022
16:15
10/16/2022
16:45
0.50 SLOT, PERF CMNT P @ 30 RPM, 1K TQ,
PUMP 14BBL OF 13.5 PPG MUD
PUSH, @ 4BPM, 260 PSI, 32% F/O.
PUMP 25BBL OF 15.8 PPG CEMENT
@ 4 BPM, 250 PSI, 36 % F/O.
PUMP 6BBL 13.5 PPG MUD PUSH @
4BPM 170 PSI, 29% F/O.
PUMP 7BBL 9.8 PPG BRINE @ 4 BPM,
120 PSI, 29 % F/O.
PUMP 3.5BBL OF 9.8 PPG, @ 2BPM,
110 PSI, 22% F/O.
2,799.0 2,799.0
10/16/2022
16:45
10/16/2022
17:00
0.25 SLOT, PERF RURD P L/D BAKER CEMENT SWIVEL,
SIMOPS CLEAN CEMENT VALVES
2,799.0 2,799.0
10/16/2022
17:00
10/16/2022
17:30
0.50 SLOT, PERF TRIP P POOH ON ELEVATORS F/ 2799' MD T/
2249' MD @ 45 FPM, 71K P/U.
MONITOR DISP. VIA TT.
INSPECT PIPE FOR CEMENT RINGS
2,799.0 2,249.0
10/16/2022
17:30
10/16/2022
18:15
0.75 SLOT, PERF CIRC P DROP NERF BALL, ROT AND RECP.
@ 254 GPM, 243 PSI, 30 RPM, 1K TQ,
F/O 35%
3068 STKS PUMPED
2,249.0 2,249.0
10/16/2022
18:15
10/16/2022
20:15
2.00 SLOT, PERF SQEZ P SQUEEZE CEMENT AS PER PLAN
FORWARD, SPACE OUT AND CLOSE
ANNULAR,PRESSURE UP TO 600PSI,
5 STKS, HOLD 15 MIN, PUMP UP TO
700 PSI, 2 STKS, HOLD 15 MIN,
PUMP UP TO 800 PSI, 2 STKS, HOLD
15 MIN, PUMP UP TO 800 PSI, 1
STKS, HOLD FOR 45 MIN,
10 TOTAL STKS PUMP, 1/2 BBL
BLEED BACK TO T.T
2,249.0 2,249.0
10/16/2022
20:15
10/16/2022
20:45
0.50 SLOT, PERF CIRC P ROT AND RECP. @ 250 GPM, 198 PSI,
30 RPM, 1K TQ, F/O 35%
1100 STKS PUMPED
2,249.0 2,249.0
10/16/2022
20:45
10/16/2022
21:00
0.25 SLOT, PERF OWFF P BLOW DOWN TOP DRIVE, 15 MIN
FLOW CHECK AS PER CO MAN
2,249.0 2,249.0
10/16/2022
21:00
10/16/2022
21:45
0.75 SLOT, PERF TRIP P POOH F/2249' T/928' PUW=65K,
MONITOR HOLE FILL VIA T.T
2,249.0 928.0
10/16/2022
21:45
10/16/2022
22:00
0.25 SLOT, PERF RURD P SWAP HANDLING EQUIPMENT AND
RIG UP CASING TONGS
928.0 928.0
10/16/2022
22:00
10/16/2022
22:30
0.50 SLOT, PERF TRIP P POOH F/928' T/0' RACKING BACK 3
1/2 TUBING IN DERRICK
928.0 0.0
10/16/2022
22:30
10/17/2022
00:00
1.50 SLOT, PERF CLEN P CLEAN AND CLEAR RIG FLOOR, M/U
STACK WASH TOOL TO 1 STD OF DP,
CON'T WITH
HOUSE KEEPING AND MP2'S
0.0 0.0
10/17/2022
00:00
10/17/2022
06:00
6.00 SLOT, PERF CLEN P CLEAN AND CLEAR RIG FLOOR, M/U
STACK WASH TOOL TO 1 STD OF DP,
CON'T WITH HOUSE KEEPING AND
MP2'S
0.0 0.0
10/17/2022
06:00
10/17/2022
07:15
1.25 SLOT, PERF RURD P RIG UP TESTING EQUIPMENT. 4"
TIW'S, DART, TEST HOSES AND
CHECK SENSATORS ON
TEST CHART. SIMOPS DRAIN STACK
0.0 0.0
10/17/2022
07:15
10/17/2022
10:00
2.75 SLOT, PERF WWWH P PULL WEAR RING AS PER FMC REP.
R/U JOHNNY WHACK STACK.
FUNCTION RAMS AS PER
SOP. RE DRAIN STACK, AND INSTALL
TEST PLUG
0.0 0.0
10/17/2022
10:00
10/17/2022
10:45
0.75 SLOT, PERF BOPE P FLOOD LINES AND PERFORM SHELL
TEST TO 4200 PSI.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 29/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/17/2022
10:45
10/17/2022
12:00
1.25 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW
4,200 HIGH FOR 5 CHARTED MIN. W/
EXCEPTION OF
MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI, W/ 4" TEST JT TEST
ANNULAR W/ 4" TJ T/ 4200 PSI, 3 1/2"
X 6" UPR, 3 1/2" X 6" LPR, W/ 3 1/2"
TEST JT TEST 3 1/2"
X 6" UPR & 3 1/2" X 6" LPR, TEST
CHOKE VALVES 1-15, MANUAL
OPERATED & SUPER CHOKE,
CHOKE & KILL MANUALS & HCR'S, 4"
VALVE ON KILL LINE, 2X 4" FOSV, 4"
DART VALVE;
BLIND/ SHEAR RAMS;
0.0 0.0
10/17/2022
12:00
10/17/2022
16:00
4.00 SLOT, WHDBOP BOPE P CONT. TEST BOPE ALL TESTS T/ 250
LOW 4,200 HIGH FOR 5 CHARTED
MIN. W/ EXCEPTION
OF MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI FOR 5 CHARTED
MIN, W/ 3 1/2" TEST JT TEST
ANNULAR T/ 3500 PSI, 3 1/2" X 6"
UPR, 3 1/2" X 6" LPR, W/ 3 1/2"
TEST JT TEST 3 1/2" X 6" UPR & 3 1/2"
X 6" LPR T/ 4200 PSI, TEST CHOKE
VALVES 1-15,
MANUAL OPERATED & SUPER
CHOKE, CHOKE & KILL MANUALS &
HCR'S, 4" VALVE ON KILL
LINE, 2X 4" FOSV, 4" DART VALVE,
UPPER & LOWER IBOP; BLIND/
SHEAR RAMS; PERFORM
KOOMEY DRAWDOWN, ACC = 3000
PSI. MANIF. = 1500 PSI. ACC = 1800
PSI AFTER ALL
FUNCTIONS ON BOTTLES, 9 SEC
FOR 200 PSI. BUILD W/ 2 ELEC.
PUMPS, 70 SEC T/ BUILD
FULL SYS. PRESSURE W/ 2 ELEC. &
2 AIR PUMPS, CLOSING TIMES
ANNULAR = 20 SEC. UPR
= 16 SEC. BLIND / SHEARS = 16 SEC.
LPR = 16 SEC. CHOKE HCR = 2 SEC.
KILL HCR = 2 SEC;
TEST PVT GAIN/LOSS AND FLOW
OUT ALARMS, TEST LEL AND H2S
ALARMS; AOGCC REP
KAM ST. JOHN WAIVED WITNESS @
10:36 HRS on 10/14/22 UPPER IBOP
FAIL, BLIND RAMS
FAIL/PASS.
0.0 0.0
10/17/2022
16:00
10/17/2022
16:45
0.75 SLOT, WHDBOP RURD P REMOVE TJ AND TEST PLUG. DRAIN
STACK AND INSTALL WEAR RING AS
PER FMC REP
0.0 0.0
10/17/2022
16:45
10/17/2022
17:15
0.50 SLOT, WHDBOP RURD P R/D B/D TESTING EQUIPMENT. BLOW
DWN CHK AND KILL.
0.0 0.0
10/17/2022
17:15
10/17/2022
18:00
0.75 SLOT, WHDBOP EQRP P PREP TOP DRIVE FOR UPPER IBOP
AND SAVER SUB REMOVAL
0.0 0.0
10/17/2022
18:00
10/17/2022
21:30
3.50 SLOT, WHDBOP RGRP T INSTALL NEW UPPER IBOP AND XT-
39 SAVER SUB AS PER SOP,
TORQUE TO 45K, 3X'S,
WINTNESSED BY TOUR PUSHER
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 30/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/17/2022
21:30
10/18/2022
00:00
2.50 SLOT, WHDBOP BOPE P CLEAN AND CLEAR RIG FLOOR,
PREP FOR TEST, TEST UPPER IBOP,
250 PSI, 4200 PSI, 5
MIN EACH, "CHARTED"
0.0 0.0
10/18/2022
00:00
10/18/2022
00:15
0.25 SLOT, CSGRCY RURD P R/D TEST EQUIPMENT, BLOW DOWN
TO[P-DRIVE AND CHOKE LINE PREP
RIG FLOOR FOR BHA
0.0 0.0
10/18/2022
00:15
10/18/2022
01:45
1.50 SLOT, CSGRCY TRIP P PJSM M/U BAKER CLEAN OUT ASSY
TIH 0' TO 2257'
0.0 2,257.0
10/18/2022
01:45
10/18/2022
02:15
0.50 SLOT, CSGRCY CIRC P CIRCULATE B/U @ 2257' 250 GPM 270
PSI 30 RPM 1K TQ 38% F/O
2,257.0 2,257.0
10/18/2022
02:15
10/18/2022
06:00
3.75 SLOT, CSGRCY REAM P WASH AND REAM CEMENT FROM
2257' TO 2474' 250 GPM 270 PSI 30
RPM 1K TQ 2-5K WOB 36 % F/O
2,257.0 2,474.0
10/18/2022
06:00
10/18/2022
09:45
3.75 SLOT, CSGRCY REAM P WASH AND REAM CEMENT F/2,474'
T/2,675', 300 GPM, 550 PSI, 50 RPM, 1
-2K TQ, 7-8K WOB, 40% F.O
2,474.0 2,675.0
10/18/2022
09:45
10/18/2022
10:00
0.25 SLOT, CSGRCY CIRC P CIRCULATE, ROT & RECIP UNTIL
SHAKERS CLEAN F/ 2,672‘ T/ 2,653‘,
W/ GPM = 250, PSI =
275, FLOW OUT = 39%, RPM = 30, TQ
= 1-2K, P/U RT WT = 75K, S/O RT WT
= 81K, RT WT = 76K,
TOTAL PUMPED STKS = 705
2,257.0 2,474.0
10/18/2022
10:00
10/18/2022
10:30
0.50 SLOT, CSGRCY CIRC P DISP. WELL OVER TO 9.8PPG LSND
MUD @ 250 GPM, 307 PSI, 37% F/O,
30 RPM, 1K TQ,
1032 STKS PUMPED.
2,257.0 2,474.0
10/18/2022
10:30
10/18/2022
11:00
0.50 SLOT, CSGRCY OTHR P 10K TAG CEMENT TAG WITNESSED
BY AOGCC REP GUY COOK. SPACE
OUT @ 2664' AND
RIG UP TO TEST CEMENT.
2,675.0 2,664.0
10/18/2022
11:00
10/18/2022
12:00
1.00 SLOT, CSGRCY PRTS P PRESSURE TEST CEMENT T/ 1500
PSI CHARTED FOR 30 MIN. 19 STKS
PUMPED. 1.7 BBL
BLED BACK TEST WITNESSED BY
AOGCC REP GUY COOK.
2,664.0 2,664.0
10/18/2022
12:00
10/18/2022
12:30
0.50 SLOT, CSGRCY RURD P R/D AND B/D TEST EQUIPMENT.
PREP FOR FLUID SWAP
2,664.0 2,664.0
10/18/2022
12:30
10/18/2022
13:00
0.50 SLOT, CSGRCY CIRC P DISP. WELL OVER TO 9.8PPG BRINE
@ 250 GPM, 315 PSI, 37% F/O, 30
RPM, 1K TQ, 1233
STKS PUMPED
2,664.0 2,664.0
10/18/2022
13:00
10/18/2022
13:30
0.50 SLOT, CSGRCY OWFF P B/D TD OWFF F/ 15 MIN. 2,664.0 2,664.0
10/18/2022
13:30
10/18/2022
14:45
1.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS RACKING
BACK. F/ 2664 T/ 19' MD. MONITOR
DISP VIA TT.
2,664.0 19.0
10/18/2022
14:45
10/18/2022
15:30
0.75 SLOT, CSGRCY BHAH P L/D BAKER BHA AS PER BAKER REP.
F/ 19' MD T/ SURFACE
19.0 0.0
10/18/2022
15:30
10/18/2022
16:30
1.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR. L/D
BAKER BHA DWN SLIDE AND PICK
NEW BAKER BHA.
0.0 0.0
10/18/2022
16:30
10/18/2022
17:30
1.00 SLOT, CSGRCY BHAH P M/U BAKER BHA AND 9 JTS OF 4"
HWDP F/ SURFACE T/ 287' MD.
0.0 287.0
10/18/2022
17:30
10/18/2022
18:15
0.75 SLOT, CSGRCY TRIP P RIH W/ 4" DP OUT OF DERRICK F/
287' MD T/ 1900' MD, 90 FT/MIN,
MONITOR DISP VIA TT.
287.0 1,900.0
10/18/2022
18:15
10/18/2022
19:00
0.75 SLOT, CSGRCY TRIP P RIH W/ 4" DP OUT OF DERRICK F/
1900' MD T/ 2675' MD, 90 FT/MIN,
MONITOR DISP VIA TT.
SOW= 70K, PUW= 79K
1,900.0 2,675.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 31/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/18/2022
19:00
10/18/2022
19:15
0.25 SLOT, CSGRCY CIRC P FILL PIPE, 2 BPM, 169 PSI,
CIRCUALTE @ 123 GPM, 342 PSI, 29
% F.O, 1280 TOTAL STKS
PUW= 82K, SOW= 83K, 60 RPM, 1K
TQ, 90 RPM, 1K TQ
SPR'S PUMP #1, 20SPM/220PSI,
30SPM/420PSI, PUMP #2,
20SPM/200PSI, 30SPM/420PSI
2,675.0 2,675.0
10/18/2022
19:15
10/18/2022
20:00
0.75 SLOT, CSGRCY CUTP P LOCATE COLLAR IN 7" CASING AS
PER REP @ 2,640', PERFORM CUT @
2,635', 90RPM, PSI
740, DROPPED TO 600PSI, SET
DOWN 5K TO VERIFY
2,675.0 2,640.0
10/18/2022
20:00
10/18/2022
20:45
0.75 SLOT, CSGRCY CIRC P SPACE OUT AND CLOSE UPPER
VBR'S, ATTEMPT TO CIRCULATE
W/OA UNSUCCESSFUL,
PRESSURE UP TO 460 PSI, 3 TOTAL
STKS
2,640.0 2,617.0
10/18/2022
20:45
10/18/2022
21:00
0.25 SLOT, CSGRCY TRIP P L/D WORKING SINGLE, POOH
F/2,617' T/2,367' PUW= 80K, MONITOR
HOLE FILL VIA T.T
2,617.0 2,367.0
10/18/2022
21:00
10/18/2022
21:30
0.50 SLOT, CSGRCY CUTP P LOCATE COLLAR IN 7" CASING AS
PER REP @ 2,360', PERFORM CUT @
2,363', 90RPM, PSI
820, DROPPED TO 760PSI, SET
DOWN 5K TO VERIFY
2,360.0 2,363.0
10/18/2022
21:30
10/18/2022
22:00
0.50 SLOT, CSGRCY CIRC P SPACE OUT, CLOSE UPPER VBR'S,
DISPLACE OA TO TIGER TANK @150
GPM, 784 PSI, 1005
TOTAL STKS PUMPED, 100BBL
RECIEVED TO TIGER TANK, 9.8BRINE
OBSERVED AT CHOKE
HOUSE
2,363.0 2,363.0
10/18/2022
22:00
10/18/2022
22:45
0.75 SLOT, CSGRCY CIRC P CIRCULATE @ 2,363', 170 GPM, 660
PSI, 32% F.O, 970 TOTAL STKS
PUMPED
2,363.0 2,363.0
10/18/2022
22:45
10/18/2022
23:00
0.25 SLOT, CSGRCY CUTP P VERIFY CUT WAS MADE, ROTATE @
90 RPM, 4BPM, 750 PSI
2,363.0 2,363.0
10/18/2022
23:00
10/18/2022
23:30
0.50 SLOT, CSGRCY CIRC P CIRCULATE @ 2,363', 170 GPM, 620
PSI, 28% F.O, 800 TOTAL STKS
PUMPED
2,363.0 2,363.0
10/18/2022
23:30
10/19/2022
00:00
0.50 SLOT, CSGRCY OWFF P L/D WORKING SINGLE, BLOW DOWN
TOP DRIVE, 30 MIN FLOW CHECK ON
T.T AS PER CO
MAN
2,330.0 2,330.0
10/19/2022
00:00
10/19/2022
01:30
1.50 SLOT, CSGRCY TRIP P TOOH F/ 2364' TO SURFACE , P/U 80K
MONITOR HOLE FILL VIA TT.
INSPECT AND L/D CUTTER AS PER
BAKER REP, KNIVES BLADES
SHOWED WORN.
2,364.0 0.0
10/19/2022
01:30
10/19/2022
03:30
2.00 SLOT, CSGRCY OTHR P DRAIN STACK PULL WEAR RING AS
PER FMC REP FUNCTIONAL ALL
RAMS AND ANNULAR ASA PER SOP
WASH STACK AT MAX RATE, DRAIN
STACK SET TEWST PLUG SIMOPS
PREP RAMS CHANGING REMOVE
UPPER VBR'S AND INSTALL 7" SOLID
BODY RAMS MONITORING WELL AT
OA
0.0 0.0
10/19/2022
03:30
10/19/2022
04:00
0.50 SLOT, CSGRCY BOPE P M/U TEST JOINT AS PER FMC REP
FLOOD STACK AND SURFACE LINES
WITH H2O PREP FOR BOP TEST.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 32/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/19/2022
04:00
10/19/2022
05:30
1.50 SLOT, CSGRCY PRTS P TEST 7" RAMS 250 /4200
TEST ANNULAR 250/4200 ON CHART
5 MIN LOW AND5 MIN HIGH ON
CHART
0.0 0.0
10/19/2022
05:30
10/19/2022
06:00
0.50 SLOT, CSGRCY WWSP P PULL 7" PACKOFF AS PER FMC 0.0 0.0
10/19/2022
06:00
10/19/2022
07:15
1.25 SLOT, CSGRCY RURD P RIG DOWN TESTING EQUIPMENT.
PULL WEAR RING AS PER FMC AND
DRAIN STACK. BLOW
DOWN KILL LINE.
0.0 0.0
10/19/2022
07:15
10/19/2022
09:00
1.75 SLOT, CSGRCY OWFF P VERIFY OA PRESSURE IS ZERO PSI.
M/U PACK OFF RUNNING TOOL AND
PULL PACK OFF
AS PER FMC. 7K TO PULL PACKOFF
0.0 0.0
10/19/2022
09:00
10/19/2022
09:45
0.75 SLOT, CSGRCY PULL P INSTALL AND M/I LANDING JOINT AS
PER FMC REP. RIG UP INSTALL X/O'S
AND P/U 94K
BREAKOVER
0.0 39.0
10/19/2022
09:45
10/19/2022
10:15
0.50 SLOT, CSGRCY CIRC P CIRC. STS STKS @ 300 GPM, 233
PSI, 38% F/O. 2053 STKS PUMPED
0.0 0.0
10/19/2022
10:15
10/19/2022
11:00
0.75 SLOT, CSGRCY OWFF P OWFF F/30 MIN 0.0 0.0
10/19/2022
11:00
10/19/2022
11:15
0.25 SLOT, CSGRCY RURD P RIG DWN X/O'S AND PUMPING SUB.
B/D FILL LINE. RIG UP DDI CSG.
0.0 0.0
10/19/2022
11:15
10/19/2022
11:30
0.25 SLOT, CSGRCY PULL P PULL LANDING JOINT AND HANGER
AND LAY DOWN. POOH F/ 2363' MD T/
2318' MD P/U
94K.
2,363.0 2,318.0
10/19/2022
11:30
10/19/2022
12:00
0.50 SLOT, CSGRCY PULL P POOH LAYING DOWN 7" CSG WITH
DDI CSG. F/ 2318' MD T/ 2268' MD.
MONITOR DISP. VIA TT
2,318.0 2,268.0
10/19/2022
12:00
10/19/2022
12:15
0.25 SLOT, CSGRCY PULL P POOH LAYING DOWN 7" CSG WITH
DDI CSG. F/ 2268' MD T/ 2241' MD.
MONITOR DISP. VIA
TT. DISP OFF. HOLE SWABBING
2,268.0 2,241.0
10/19/2022
12:15
10/19/2022
12:45
0.50 SLOT, CSGRCY PULL P M/U X/O'S. AND CBU @ 415 GPM, 168
PSI, 50% F/O. RICP. PIPE F/ 2241' MD
T/ 2002' MD. S/O
90K P/U 84K @ FULL RATE 1150 STKS
PUMPED. ATTEMPT TO POOH ON
ELEVATORS.
SWABBING NOTED
2,241.0 2,002.0
10/19/2022
12:45
10/19/2022
13:00
0.25 SLOT, CSGRCY CIRC P CBU @ 500 GPM, 182 PSI, 51% F/O.
ROT 10 RPM, 1K TQ, RICP. PIPE F/
2241' MD T/ 2002' MD.
S/O 90K P/U 84K, 84K ROT @ FULL
RATE 1150 STKS PUMPED
2,241.0 2,002.0
10/19/2022
13:00
10/19/2022
13:30
0.50 SLOT, CSGRCY PULL P ATTEMPT. TO PULL ON ELEVATORS.
SWABBING STILL NOTED. 93K P/U
2,002.0 2,002.0
10/19/2022
13:30
10/19/2022
15:30
2.00 SLOT, CSGRCY RURD P SHUT DOWN. RIG UP VOLANT AS
PER DDI CSG REP
2,002.0 2,002.0
10/19/2022
15:30
10/19/2022
18:00
2.50 SLOT, CSGRCY PMPO P PUMP OUT THE HOLE F/ 2002' MD T/
1550' MD 2BPM, 146 PSI, 24% F/O,
77K P/U
2,002.0 1,550.0
10/19/2022
18:00
10/19/2022
20:45
2.75 SLOT, CSGRCY PMPO P PUMP OUT THE HOLE F/ 1550' MD T/
0' MD 2BPM, 25 PSI, 24% F/O, 57 JTS
AND A 3' CUT JT
LAID DOWN TO PIPE SHED, 27
CENTRALIZERS REMOVED
1,550.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 33/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/19/2022
20:45
10/19/2022
22:00
1.25 SLOT, CSGRCY WASH P RIG DOWN CASING EQUIPMENT,
CLEAN AND CLEAR RIG FLOOR,
PREP FOR RAM CHANGE,
M/U STACK WASHER AND WASH
STACK AT MAX RATE AS PER SOP,
BLOW DOWN TD AND
MUDLINE
0.0 0.0
10/19/2022
22:00
10/19/2022
23:30
1.50 SLOT, CSGRCY OTHR P DRAIN STACK, FLUSH LINES W/H20,
SHUT BLIND RAMS AND BLEED OFF
KOOMEY,
REMOVE 7" SOLID BODY RAMS AND
INSTALL UPPER VBR'S AS PER SOP
0.0 0.0
10/19/2022
23:30
10/20/2022
00:00
0.50 SLOT, CSGRCY OTHR P SET TEST PLUG W/5" TEST JT AS
PER FMC REP, FLOOD STACK W/H20
AND FLUID PACK
LINES
0.0 0.0
10/20/2022
00:00
10/20/2022
01:00
1.00 SLOT, CSGRCY PRTS P TEST 3.5" X 6"VBR'S W/ 3.5" PIPE
AND 5" PIPE 250/4200 PSI ON CHART
5 MIN LOW AND HIGH TEST
0.0 0.0
10/20/2022
01:00
10/20/2022
02:00
1.00 SLOT, CSGRCY RURD P PULL TEST PLUG AND L/D TEST JT
AS PER FMC HAND BLOW DOWN
CJHOKE AND KILL LINES CLEAN AND
CLEAR RIG FLOOR
0.0 0.0
10/20/2022
02:00
10/20/2022
02:30
0.50 SLOT, CSGRCY BHAH P M/U 9 5/8" SCRFAPPER ASSY W/ 8
3/4" ROCK BIT
0.0 10.0
10/20/2022
02:30
10/20/2022
03:30
1.00 SLOT, CSGRCY TRIP P TIH W/ 4" DRILL PIPE F/ 10' TO 2090' '
SO 75K P/U 75K MONITOR
DISPLACEMENT VIA TT
10.0 2,090.0
10/20/2022
03:30
10/20/2022
04:15
0.75 SLOT, CSGRCY WASH P WASH DOWN F/ 2090' TO 2363' TAG
TOF W/ 3K 250GPM 179+ PSI 34% F/O
SOW 754K
2,090.0 2,363.0
10/20/2022
04:15
10/20/2022
04:45
0.50 SLOT, CSGRCY CIRC P CIRCULATE B/U 2360' 381 GPM 433
PSI
2,360.0 2,360.0
10/20/2022
04:45
10/20/2022
05:00
0.25 SLOT, CSGRCY OWFF P OWFF WELL STATIC 2,360.0 2,360.0
10/20/2022
05:00
10/20/2022
06:00
1.00 SLOT, CSGRCY TRIP P TOOH FROM 2360' TO 0' 2,360.0 0.0
10/20/2022
06:00
10/20/2022
08:00
2.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR.
REMOVE ROTARY TABLE COVER
AND CLEAN DRIP PAN.
WAIT FOR WIRELINE. SIMOPS LOAD
15 JTS OF 5" HWDP IN SHED.
0.0 0.0
10/20/2022
08:00
10/20/2022
09:00
1.00 SLOT, CSGRCY RURD P LOAD WIRELINE TOOLS IN SHED.
M/U SHEAVES T BAR
0.0 0.0
10/20/2022
09:00
10/20/2022
10:00
1.00 SLOT, CSGRCY ELOG P M/U WIRE LINE TOOLS AS PER
SLMB. REPS F/ SURFACE T/ 54' MD.
FUNCTION TEST TOOLS
0.0 54.0
10/20/2022
10:00
10/20/2022
12:00
2.00 SLOT, CSGRCY ELOG P RIH WITH SLMB. USIT LOG F/ 54'
T/2360' MD
54.0 2,360.0
10/20/2022
12:00
10/20/2022
14:30
2.50 SLOT, CSGRCY ELOG P CONT. WITH SLMB. USIT LOG F/ 54'
T/2360' MD
54.0 2,360.0
10/20/2022
14:30
10/20/2022
15:15
0.75 SLOT, CSGRCY ELOG P R/D & L/D WIRELINE 0.0 0.0
10/20/2022
15:15
10/20/2022
15:45
0.50 SLOT, CSGRCY ELOG P CLEAN AND ORGANIZE RIG FLOOR.
P/U BAKER FISHING SPEAR TOOLS
TO RIG FLOOR.
0.0 0.0
10/20/2022
15:45
10/20/2022
18:45
3.00 SLOT, CSGRCY ELOG P M/U BAKER SPEAR PACKOFF AS
PER BAKER REP F/ SURFACE T/ 520'
MD. S/O 73K
MONITOR DISP. VIA TT.
0.0 520.0
10/20/2022
18:45
10/20/2022
19:00
0.25 SLOT, CSGRCY ELOG P M/U X/O, C/O HANDLING EQUIPMENT
FROM 5" T/ 4"
520.0 520.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 34/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/20/2022
19:00
10/20/2022
20:00
1.00 SLOT, CSGRCY TRIP P RIH ON 4" DP F/ 520' MD T/ 2,316' MD.
MONITORING DISPLACEMENT VIA
TRIP TANK. S/O
WT= 92K, P/U WT= 88K
520.0 2,316.0
10/20/2022
20:00
10/20/2022
20:15
0.25 SLOT, CSGRCY TRIP P RIH F/ 2,316' MD T/ 2,369' MD. @
2,369' MD SET 10K WOB, CONFIRM
SPEAR IN CSG
2,316.0 2,363.0
10/20/2022
20:15
10/20/2022
20:30
0.25 SLOT, CSGRCY FISH P JAR 10 TIMES. SET DOWN T/ 70K,
PULL UP AND FIRE JARS AT 260K,
PULL UP TO 300K AND
CHECK PROGRESS. MADE NO
PROGRESS
2,363.0 2,363.0
10/20/2022
20:30
10/20/2022
21:15
0.75 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION.
PRESSURE UP T/ 400 PSI, NO BLEED
OFF OR
COMMUNICATION OBSERVED
2,363.0 2,363.0
10/20/2022
21:15
10/20/2022
21:30
0.25 SLOT, CSGRCY FISH P CONT. TO JAR 10 TIMES. SET DOWN
T/ 70K, PULL UP AND FIRE JARS AT
260K, PULL UP TO
300K AND CHECK PROGRESS. MADE
NO PROGRESS
2,363.0 2,363.0
10/20/2022
21:30
10/20/2022
22:00
0.50 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION.
PRESSURE UP T/ 400 PSI, NO BLEED
OFF OR
COMMUNICATION OBSERVED
2,363.0 2,363.0
10/20/2022
22:00
10/20/2022
22:15
0.25 SLOT, CSGRCY FISH P CONT. TO JAR 10 TIMES. SET DOWN
T/ 70K, PULL UP AND FIRE JARS AT
260K, PULL UP TO
300K AND CHECK PROGRESS. MADE
NO PROGRESS
2,363.0 2,363.0
10/20/2022
22:15
10/20/2022
22:30
0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION.
PRESSURE UP T/ 400 PSI, NO BLEED
OFF OR
COMMUNICATION OBSERVED.
2,363.0 2,363.0
10/20/2022
22:30
10/20/2022
23:00
0.50 SLOT, CSGRCY FISH P CONT. TO JAR 20 TIMES. SET DOWN
T/ 52K, PULL UP AND FIRE JARS AT
270K, PULL UP TO
320K AND CHECK PROGRESS. MADE
NO PROGRESS
2,363.0 2,363.0
10/20/2022
23:00
10/20/2022
23:15
0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION.
PRESSURE UP T/ 400 PSI, NO BLEED
OFF OR
COMMUNICATION OBSERVED
2,363.0 2,363.0
10/20/2022
23:15
10/20/2022
23:45
0.50 SLOT, CSGRCY FISH P CONT. TO JAR 20 TIMES. SET DOWN
T/ 52K, PULL UP AND FIRE JARS AT
270K, PULL UP TO
320K AND CHECK PROGRESS. MADE
NO PROGRESS
2,363.0 2,363.0
10/20/2022
23:45
10/21/2022
00:00
0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION.
PRESSURE UP T/ 400 PSI, NO BLEED
OFF OR
COMMUNICATION OBSERVED.
2,363.0 2,363.0
10/21/2022
00:00
10/21/2022
00:15
0.25 SLOT, CSGRCY OTHR P CONT. DERRICK INSPECTION
PRESSURE UP 400 PSI NO BLEED
OR COMMUNICTION OBSERVED
2,363.0 2,363.0
10/21/2022
00:15
10/21/2022
01:00
0.75 SLOT, CSGRCY FISH P RELEASE BAKER SPEAR FROM 7"
CASING FISH AS PER BAKER REP
2,363.0 2,363.0
10/21/2022
01:00
10/21/2022
01:45
0.75 SLOT, CSGRCY CIRC P POOH TO 2360' CIRC B/U P/U 89K
FLOW OUT 32 % 1929 STROKES
PUMPED
2,363.0 2,360.0
10/21/2022
01:45
10/21/2022
02:30
0.75 SLOT, CSGRCY OWFF P OWFF WELL STATIC BLOW DOWN
TOP DRIVE
2,363.0 2,363.0
10/21/2022
02:30
10/21/2022
03:45
1.25 SLOT, CSGRCY TRIP P TOOH RACKING BACK 4" DRILL PIPE
F/ 2360 TO 520' P/U 64K
2,363.0 520.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 35/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/21/2022
03:45
10/21/2022
04:00
0.25 SLOT, CSGRCY RURD P INSTALL XO O 4" TIW CHANGE OUT
HANDLING EQUIP TO 5"
520.0 520.0
10/21/2022
04:00
10/21/2022
05:00
1.00 SLOT, CSGRCY TRIP P TOOH F/ 520' RACKING BACK 5"
HWDP AND JARS TO SURFACE P/U
40K L/D BAKER SPEAR ASSY
INSPECTED SAME
520.0 0.0
10/21/2022
05:00
10/21/2022
06:00
1.00 SLOT, CSGRCY OWFF P DERRICK INSPECTION AND PAPER
WORK / WHILE OWFF WELL VIA TT
0.0 0.0
10/21/2022
06:00
10/21/2022
07:15
1.25 SLOT, CSGRCY OWFF P DERRICK INSPECTION AND PAPER
WORK / WHILE OWFF WELL VIA TT
0.0 0.0
10/21/2022
07:15
10/21/2022
08:00
0.75 SLOT, CSGRCY WWWH P INSTALL WEAR RING AS PER FMC.
REP
0.0 0.0
10/21/2022
08:00
10/21/2022
08:30
0.50 SLOT, CSGRCY BHAH P M/U BAKER BHA AS PER BAKER BHA.
F/ SURFACE T/ 287' MD
0.0 287.0
10/21/2022
08:30
10/21/2022
09:45
1.25 SLOT, CSGRCY TRIP P CONT. RIH F/ 287' MD T/ 2372' MD 76K
S/O, 73K P/U. MONITOR DISP. VIA TT.
287.0 2,373.0
10/21/2022
09:45
10/21/2022
10:30
0.75 SLOT, CSGRCY WAIT P WAIT ON ORDERS FROM TOWN 2,373.0 2,373.0
10/21/2022
10:30
10/21/2022
12:00
1.50 SLOT, CSGRCY TRIP P RIH F/ 2372' MD T/ 2473' MD FILL
PIPE,240 STKS. STAGE PUMPS UP
TO 152 GPM, 503 PSI,
30% F/O. RICP. PIPE F/ 2465' MD T/
2535' MD. ATTEMPTING TO LOCATE
COLLAR
2,373.0 2,473.0
10/21/2022
12:00
10/21/2022
12:30
0.50 SLOT, CSGRCY FISH P SPACE OUT AND CUT CSG AS PER
BAKER REP @ 2490' MD. 90 RPM, 1K
TQ, 195 GPM, 803
PSI, PRESSURE DROP T/ 628 PSI.
SET DWN 5K TO VERIFY CSG IS CUT.
PRESS. DROP T/ 233
PSI. ROT 85K P/U 82K, S/O 84K
2,490.0 2,490.0
10/21/2022
12:30
10/21/2022
13:45
1.25 SLOT, CSGRCY TRIP P PULL OUT HOLE F/ 2490' MD T/ 2462'
MD P/U 86K AND CBU @ 195 GPM,
786 PSI, 0 RPM, 30 %
F/O.
2,490.0 2,462.0
10/21/2022
13:45
10/21/2022
14:00
0.25 SLOT, CSGRCY OWFF P B/D T/D OWFF, 15 MIN 2,462.0 2,462.0
10/21/2022
14:00
10/21/2022
16:15
2.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2462' MD T/
SURFACE. MONITOR DISP. VIA TT.
L/D BAKER
CUTTER
2,462.0 0.0
10/21/2022
16:15
10/21/2022
16:30
0.25 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR P/U
BAKER SPEAR AND PACKOFF ASS.
TO RIG FLOOR
0.0 0.0
10/21/2022
16:30
10/21/2022
17:30
1.00 SLOT, CSGRCY BHAH P REPLACE BAKER GRAPPLE AND M/U
BAKER BHA AS PER BAKER REP F/
SURFACE T/ 520'
MD 67K S/O
0.0 520.0
10/21/2022
17:30
10/21/2022
18:00
0.50 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 520' MD T/
1102' MD S/O 79K, MONITOR DISP VIA
TT.
520.0 1,102.0
10/21/2022
18:00
10/21/2022
18:45
0.75 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 1,102' MD T/
2,316' MD. S/O WT= 93K, MONITOR
DISP VIA TT.
1,102.0 2,316.0
10/21/2022
18:45
10/21/2022
19:45
1.00 SLOT, CSGRCY CIRC P @ 2,316 CIRC B/U @ 6 BPM, 127 PSI,
33% F/O. TOTAL STKS PUMPED=
2,000 (201 BBLS).
SIMOPS- C/O MCWS BATTERY,
CHECK TORQUES ON TOP DRIVE
SHOCK PIN
2,316.0 2,316.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 36/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/21/2022
19:45
10/21/2022
20:00
0.25 SLOT, CSGRCY TRIP P RIH F/ 2,316' MD T/ 2,370' MD. P/U
WT=89K, S/O WT= 93K. SET DOWN
10K ON TOP OF FISH.
P/U AND OBSERVE BREAK OVER @
103K
2,316.0 2,370.0
10/21/2022
20:00
10/21/2022
20:30
0.50 SLOT, CSGRCY TRIP P POOH F/ 2,370' MD T/ 2,226' MD. P/U
WT= 93K-103K. KEEPING 200 PSI ON
STRING, CANNOT
ESTABLISH CIRCULATION. OBSERVE
SWABBING WHILE POOH.
@ 2,267' MD OBSERVE CIRCULATION
@ 1BPM, 14 PSI, 14-21% F/O.
2,370.0 2,226.0
10/21/2022
20:30
10/21/2022
22:00
1.50 SLOT, CSGRCY CIRC P @ 2,226' MD CIRC B/U X2 @ 6 BPM,
122 PSI, 36%. TOTAL STKS PUMPED=
5,404 (544 BBLS)
2,226.0 2,226.0
10/21/2022
22:00
10/21/2022
22:45
0.75 SLOT, CSGRCY OWFF P OWFF F/ 30 MIN, B/D TOP DRIVE 2,226.0 2,226.0
10/21/2022
22:45
10/22/2022
00:00
1.25 SLOT, CSGRCY TRIP P POOH W/ 4" DP F/ 2,226' MD T/ 520'
MD, P/U WT= 61K. MONITORING
HOLE FILL VIA TRIP
TANK
2,226.0 520.0
10/22/2022
00:00
10/22/2022
00:30
0.50 SLOT, CSGRCY RURD P BREAK OUT AND INSTALL 4" X 5" XO
ON 4" TIW VALVE, C/O HANDLING
EQUIP
520.0 520.0
10/22/2022
00:30
10/22/2022
01:30
1.00 SLOT, CSGRCY TRIP P POOH RACKING 5" HWDP BACK IN
DERRICK FROM 520' TO SURFACE
L/D JARS MONITORING WELL VIA
HOLE FILL TT
520.0 0.0
10/22/2022
01:30
10/22/2022
02:30
1.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR TOOLS FROM
RIG FLOOR
0.0 0.0
10/22/2022
02:30
10/22/2022
03:45
1.25 SLOT, CSGRCY OTHR P L/D 7" CASING FISH TO PIPE SHED
126' RECOVERED FISH
0.0 0.0
10/22/2022
03:45
10/22/2022
04:15
0.50 SLOT, CSGRCY BHAH P P/U JT 7" CASING REMOVE
DISENGAGE /REMOVE GRAPPLE
0.0 0.0
10/22/2022
04:15
10/22/2022
07:15
3.00 SLOT, CSGRCY TRIP P P/U 8 3/4" BIT CLEAN OUT ASSY TIH
TO 2376'
0.0 2,376.0
10/22/2022
07:15
10/22/2022
08:30
1.25 SLOT, CSGRCY TRIP P 6K TAG UP @ 2376' MD. WASH AND
REAM F/ 2376' MD T/ 2488' MD. 200
GPM, 234 PSI, 34%
F/O, 30 RPM, 1K TQ. ROT = 73K
CEMENT CUTTINGS NOTICED OVER
SHAKERS
2,376.0 2,488.0
10/22/2022
08:30
10/22/2022
09:30
1.00 SLOT, CSGRCY REAM P REAM F/ 2488' T/ 2366' MD. 200- 600
GPM, 1556 PSI, 53% F/O, 60 RPM, 1K
TQ
2,488.0 2,366.0
10/22/2022
09:30
10/22/2022
10:00
0.50 SLOT, CSGRCY CIRC P CBU @ 2366' MD @ 500 GPM, 1100
PSI, 50% F/O, 0 RPM. 2150 STKS
PUMPED. SIMOPS
BRING CSG EQUIPMENT TO RIG
FLOOR.
2,366.0 2,366.0
10/22/2022
10:00
10/22/2022
10:15
0.25 SLOT, CSGRCY OWFF P B/D TD, OWFF 15 MIN 2,366.0 2,366.0
10/22/2022
10:15
10/22/2022
10:30
0.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2366' MD T/
2271' MD. 9K OVER PULL
OBSERVED. DECISION WAS
MADE TO CIRCULATE
2,366.0 2,271.0
10/22/2022
10:30
10/22/2022
11:30
1.00 SLOT, CSGRCY TRIP P CIRCULATE @ 650 GPM, 1640 PSI, 56
% F/O, 20 RPM, 1K TQ, 3189 STKS
PUMPED
2,271.0 2,271.0
10/22/2022
11:30
10/22/2022
12:00
0.50 SLOT, CSGRCY TRIP P CONT. POOH ON ELEVATORS F/
2271' MD T/ 1320' MD MONITOR DISP.
VIA TT.
2,271.0 1,320.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 37/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/22/2022
12:00
10/22/2022
13:00
1.00 SLOT, CSGRCY TRIP P CONT. POOH ON ELEVATORS F/
1320' MD T/ SURFACE' MD MONITOR
DISP. VIA TT.
1,320.0 0.0
10/22/2022
13:00
10/22/2022
13:15
0.25 SLOT, CSGRCY RURD P RIG UP DDI CSG. M/U TIW XO 0.0 0.0
10/22/2022
13:15
10/22/2022
14:45
1.50 SLOT, CSGRCY TRIP P RIH 10 STD'S OF 3.5" TUBING F/
SURFACE T/ 927' MD USING DDI
POWER TONGS
0.0 927.0
10/22/2022
14:45
10/22/2022
16:00
1.25 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 927' MD T/
2490' TAG UP. S/O 75K MONITOR
DISP. VIA TT.
927.0 2,490.0
10/22/2022
16:00
10/22/2022
16:45
0.75 SLOT, CSGRCY REAM P WASH AND REAM F/ 2490' MD T/
2625' MD. 6 BPM, 138 PSI, 10 RPM, 1K
TQ, 30% F/O.
2,490.0 2,625.0
10/22/2022
16:45
10/22/2022
17:00
0.25 SLOT, CSGRCY TRIP P PUMP 16PPG. SPACER @ 3 BPM, 17
PSI, 30 % F/O 337 STKS PUMPED
2,625.0 2,625.0
10/22/2022
17:00
10/22/2022
17:15
0.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2625' MD T/
2435' MD. P/U 72K. SIMOPS BLOW
AIR TO
CEMENTERS
2,625.0 2,435.0
10/22/2022
17:15
10/22/2022
18:00
0.75 SLOT, CSGRCY TRIP P B/D TD. P/U WORKING SINGLE, 15'
PUP JT AND BAKER CEMENT SWIVEL
AND SPACE OUT
FOR CEMENT JOB @ 2,488' MD
2,435.0 2,488.0
10/22/2022
18:00
10/22/2022
19:15
1.25 SLOT, CSGRCY CLEN P FINISH PREP IN PITS FOR CEMENT
JOB, HOLD PJSM FOR PUMPING
CEMENT
2,488.0 2,488.0
10/22/2022
19:15
10/22/2022
20:15
1.00 SLOT, CEMENT CMNT P SLB PUMPS 2 BBLS H20, TEST
SURFACE LINES T/ 500/2000 PSI
(TEST GOOD). SLB PUMPS
34.6 BBLS 13.5# MUD PUSH II, SHUT
DOWN AND DROP WIPER BALL. SLB
PUMPS 32.5 BBLS
17# CEMENT, 5.4 BBLS 13.5# MUD
PUSH II, SLB DISPLACE 13 BBLS 9.8#
BRINE.
ROTATE 20 RPM, 1K TQ DURING
CEMENT JOB
2,488.0 2,488.0
10/22/2022
20:15
10/22/2022
20:30
0.25 SLOT, WELLPR TRIP P R/D CEMENT HOSE. L/D CEMENT
SWIVEL, 14' PUP, AND 2 SINGLES F/
2,488' MD T/ 2,412'
MD.
P/U WT= 70K
2,488.0 2,412.0
10/22/2022
20:30
10/22/2022
21:15
0.75 SLOT, WELLPR TRIP P POOH ON ELEVATORS W/ 4" DP F/
2,412' MD T/ 2,054' MD @ 12 FT/MIN,
MONITORING HOLE
FILL VIA TRIP TANK. P/U WT= 65K
2,412.0 2,054.0
10/22/2022
21:15
10/22/2022
22:15
1.00 SLOT, WELLPR CIRC P @ 2,054' MD DROP WIPER BALL,
PUMP 10 BBLS FRESH WATER
CHASED W/ 9.8# BRINE.
CIRC X2 B/U @ 8 BPM, 189 PSI, 43%
F/O, 30 RPM, 1K TQ. TOTAL STKS
PUMPED= 3,124 (314
BBLS)
2,054.0 2,054.0
10/22/2022
22:15
10/22/2022
22:45
0.50 SLOT, WELLPR OWFF P OWFF (STATIC), B/D TOP DRIVE 2,054.0 2,054.0
10/22/2022
22:45
10/22/2022
23:30
0.75 SLOT, WELLPR TRIP P POOH ON ELEVATORS W/ 4" DP F/
2,054' MD T/ 927' MD, MONITORING
HOLE FILL VIA TRIP
TANK. P/U WT= 51K
2,054.0 927.0
10/22/2022
23:30
10/22/2022
23:45
0.25 SLOT, WELLPR RURD P C/O HANDLING EQUIPMENT FOR 3
1/2" TBG, R/U TO L/D 3 1/2" TBG
927.0 927.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 38/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/22/2022
23:45
10/23/2022
00:00
0.25 SLOT, WELLPR TRIP P L/D 3 1/2" HYD 563 TBG F/ 927' MD T/
710' MD, P/U WT= 48K. MONITORING
HOLE FILL VIA
TRIP TANK
927.0 0.0
10/23/2022
00:00
10/23/2022
00:45
0.75 SLOT, WELLPR WOC P CONT. T/ L/D 3 1/2" HYD 563 TBG F/
710' MD T/ SURFACE, P/U WT= 45K.
MONITORING HOLE
FILL VIA TRIP TANK
710.0 0.0
10/23/2022
00:45
10/23/2022
02:30
1.75 SLOT, WELLPR WOC P R/D 3 1/2" TBG HANDLING
EQUIPMENT, CLEAN AND CLEAR RIG
FLOOR, CLEAN OUT
CEMENT VALVES
0.0 0.0
10/23/2022
02:30
10/23/2022
06:00
3.50 SLOT, WELLPR WOC P CLEAN OUT PITS IN ROCKWASHER,
SERVICE TOP DRIVE AND BLOCKS,
HOUSEKEEPING
AROUND THE RIG, PERFORM MP2'S
0.0 0.0
10/23/2022
06:00
10/23/2022
12:00
6.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. WORK
ON MP2'S. SHUT IN BLINDS AND
PERFORM KOOMEY
MONTHLY MP2. MP2 ON
CENTRIFUGE. BLOW DOWN TIGER
TANK AND PREP FOR REMOVAL.
GATHER BAKER TOOLS AND PREP
FOR SHIPPING
0.0 0.0
10/23/2022
12:00
10/23/2022
18:00
6.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. CONT.
WITH MP2'S AND HOUSEKEEPING.
PREP FOR
UPCOMING WELL HEAD SWAP.
HOUSEKEEPING AROUND RIG.
INSTALL WATER PUMP IN
PUMP MOD
0.0 0.0
10/23/2022
18:00
10/23/2022
22:00
4.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. CONT.
WITH MP2'S AND HOUSEKEEPING.
PREP FOR
UPCOMING WELL HEAD SWAP.
HOUSEKEEPING AROUND RIG.
BREAK DOWN CEMENT
SWIVEL. PREP FOR CLEAN OUT BHA
0.0 0.0
10/23/2022
22:00
10/23/2022
22:30
0.50 SLOT, WELLPR BHAH P M/U CLEAN OUT BHA, RIH W/ 5"
HWDP F/ SURFACE T/ 479' MD, S/O
WT= 64K. MONITORING
DISPLACEMENT VIA TRIP TANK
0.0 479.0
10/23/2022
22:30
10/23/2022
22:45
0.25 SLOT, WELLPR RURD P C/O HANDLING EQUIPMENT T/ 4" 479.0 479.0
10/23/2022
22:45
10/23/2022
23:30
0.75 SLOT, WELLPR TRIP P RIH W/ 4" DP F/ 479' MD T/ 1,992' MD,
S/O WT= 83K, P/U WT= 79K.
MONITORING
DISPLACEMENT VIA TRIP TANK.
479.0 992.0
10/23/2022
23:30
10/24/2022
00:00
0.50 SLOT, WELLPR WASH P WASH DOWN F/ 1,992' MD T/ 2,176'
MD @ 3 BPM, 76 PSI, 29% F/O, S/O
WT= 83K. NEVER
TAGGED CEMENT GREEN CEMENT
COMING OVER SHAKERS, MUD
ENGINEER CAUGHT SAMPLES
992.0 2,176.0
10/24/2022
00:00
10/24/2022
00:30
0.50 SLOT, WELLPR CIRC P @ 2176' CIRCULATE 2 B/U @ 420
GPM 750 PSI 47% F/O STROKES
PUMPED 2893 NO HARD CEMENT
ONLY GREEN MUCKY CEMENT.
2,176.0 2,176.0
10/24/2022
00:30
10/24/2022
00:45
0.25 SLOT, WELLPR TRIP P POOH FROM 2176' TO 2083'
RACKING 1 STAND BACK P/U 79K
2,176.0 2,083.0
10/24/2022
00:45
10/24/2022
01:00
0.25 SLOT, WELLPR OTHR P BLOW DOWN TOP DRIVE 2,083.0 2,083.0
10/24/2022
01:00
10/24/2022
05:00
4.00 SLOT, WELLPR WOC P WAITING ON CEMENT MONITOR
WELL VIA TRIP TANK
2,083.0 2,083.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 39/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/24/2022
05:00
10/24/2022
05:30
0.50 SLOT, WELLPR WASH P TIH ONE STAND MAKE
CONNECTION WASH F/ 2176' TO
2226' WASHED WITH NO WEIGHT
2,083.0 2,226.0
10/24/2022
05:30
10/24/2022
06:00
0.50 SLOT, WELLPR CIRC P CIRCUALTE 2 B/U CIRCULATE @ 650
GPM, 1709 PSI, 30 RPM, 1K TQ, 53%
F/O. RICP. F/ 2176' MD T/ 2156' MD,
3948 STKS PUMPED
2,176.0 2,176.0
10/24/2022
06:00
10/24/2022
06:30
0.50 SLOT, WELLPR OWFF P B/D TD OWFF F/ 15 MIN. 2,176.0 2,176.0
10/24/2022
06:30
10/24/2022
09:30
3.00 SLOT, WELLPR TRIP P POOH ON ELEVATORS F/ 2176' MD T/
SURFACE. MONITOR DISP. VIA TT
2,176.0 0.0
10/24/2022
09:30
10/24/2022
11:45
2.25 SLOT, WELLPR TRIP P M/U BAKER SCRAPER AND 8-3/4" BIT
AND RIH F/ SURFACE T/ 2092' MD
MONITOR DISP. VIA
TT.
0.0 2,092.0
10/24/2022
11:45
10/24/2022
12:00
0.25 SLOT, WELLPR REAM P SCRAPE AND POLISH CSG F/ 2092' T/
2180' @ 650 GPM, 1667 PSI, 30 PRM,
1K TQ, 73K S/O,
72K P/U, 71K ROT
2,092.0 2,180.0
10/24/2022
12:00
10/24/2022
12:15
0.25 SLOT, WELLPR REAM P CONT. SCRAPE AND POLISH CSG F/
2092' T/ 2180' @ 650 GPM, 1667 PSI,
30 PRM, 1K TQ
4321 STKS PUMPED 73K S/O, 72K
P/U, 71K ROT
2,092.0 2,180.0
10/24/2022
12:15
10/24/2022
12:30
0.25 SLOT, WELLPR OWFF P B/D TD OWFF 2,180.0 2,180.0
10/24/2022
12:30
10/24/2022
14:45
2.25 SLOT, WELLPR TRIP P POOH ON ELEVATORS F/ 2180' MD T/
SURFACE. MONITOR DISP VIA TT.
P/U 72K
2,180.0 0.0
10/24/2022
14:45
10/24/2022
15:00
0.25 SLOT, WELLPR BHAH P M/U BAKER TEST PACKER AS PER
BAKER REP. F/ SURFACE T/ 27' MD.
0.0 27.0
10/24/2022
15:00
10/24/2022
17:00
2.00 SLOT, WELLPR TRIP P RIH W/ 4" DP. F/ 27' MD T/ 2178' MD.
FILLING ON THE FLY WITH FILL UP
HOSE. MONITOR
DISP. VIA PIT 5. 72K P/U, 75K S/O
27.0 2,178.0
10/24/2022
17:00
10/24/2022
18:00
1.00 SLOT, WELLPR OTHR P SPACE OUT AND SET BAKER TEST
PACKER AS PER BAKER REP @ 2178'
MD. STAGE
PRESSURE UP 500 PSI IN 15 MIN
INTERVALS
2,178.0 2,178.0
10/24/2022
18:00
10/24/2022
18:15
0.25 SLOT, WELLPR PRTS P TEST PACKER T/ 2,000 PSI F/ 5 MIN
UNCHARTED, TEST GOOD CONFIRM
PACKER SET
2,178.0 2,178.0
10/24/2022
18:15
10/24/2022
18:30
0.25 SLOT, WELLPR OTHR P RELEASE F/ PACKER PER BACKER
HUGHES REP, POOH F/ 2,178' MD T/
2,168' MD, P/U WT=
72K
2,178.0 2,168.0
10/24/2022
18:30
10/24/2022
19:15
0.75 SLOT, WELLPR CIRC P DISPLACE WELL F/ 9.8# BRINE T/
9.8# LSND @ 500 GPM, 270 PSI, 51%
F/O, 20 RPM, 1K TQ.
TOTAL STKS= 3,740 (376 BBLS)
2,168.0 2,168.0
10/24/2022
19:15
10/24/2022
20:00
0.75 SLOT, WELLPR TRIP P POOH F/ 2,168' MD T/ 2,108' MD, P/U
WT= 71K. RACK BACK STD.
R/U T/ TEST PACKER/CSG
2,168.0 2,108.0
10/24/2022
20:00
10/24/2022
20:45
0.75 SLOT, WELLPR PRTS P TEST PACKER/CSG T/ 2,000 PSI F/ 30
MIN CHARTED. WITNESSED BY EPA
REP BRIAN
GOSS. PRESSURE UP TO 2,233 PSI,
AFTER 30 MIN PRESSURE @ 2,228
PSI. 1.7 BBLS TO
PRESSURE UP, 1.7 BBLS BLED BACK
TO TRIP TANK.
2,108.0 2,108.0
10/24/2022
20:45
10/24/2022
21:00
0.25 SLOT, WELLPR RURD P R/D TESTING EQUIPMENT, B/D KILL
LINE
2,108.0 2,108.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 40/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/24/2022
21:00
10/24/2022
22:00
1.00 SLOT, WELLPR TRIP P POOH RACKING BACK 4" DP F/ 2,108'
MD T/ SURFACE, MONITORING HOLE
FILL VIA TRIP TANK
2,108.0 0.0
10/24/2022
22:00
10/24/2022
22:15
0.25 SLOT, WELLPR BHAH P SWAP COMPONENT ON BAKER
HUGHES PACKER RUNNING TOOL
PER BAKER HUGHES
REP. L/D PACKER RUNNING TOOL
0.0 0.0
10/24/2022
22:15
10/24/2022
22:30
0.25 SLOT, WELLPR OTHR P PULL WEAR RING PER FMC REP 0.0 0.0
10/24/2022
22:30
10/24/2022
23:00
0.50 SLOT, WELLPR WWWH P WASH BOP STACK 0.0 0.0
10/24/2022
23:00
10/24/2022
23:30
0.50 SLOT, WELLPR OWFF P OWFF (STATIC) 0.0 0.0
10/24/2022
23:30
10/25/2022
00:00
0.50 SLOT, WELLPR NUND P VERIFIED 2 BARRIERS: TESTED
BAKER PACKER 2000 PSI TEST 9
5/8" CASING 2000 PSI F/ 30 MIN ON
CHART WITNESS BY EPA REP RYAN
GOSS TEST FLUID 9.8 PPG LSND.
WP PRIOR TO N/D BOPE
0.0 0.0
10/25/2022
00:00
10/25/2022
02:00
2.00 SLOT, WELLPR NUND P CONT. NIPPLE DOWN BOPE AND
RISERS
0.0 0.0
10/25/2022
02:00
10/25/2022
06:00
4.00 SLOT, WELLPR NUND P NIPPLE DOWN AND PULL FMC WELL
HEAD TO GEN 5 AS PER FMC
REP.SIMOPS CHANGE OUT UPPER
RAMS TO 3.5" X 6" VBR'S
0.0 0.0
10/25/2022
06:00
10/25/2022
08:30
2.50 SLOT, WELLPR NUND P P/U AND INSTALL FMC GEN 5 WELL
HEAD AS PER FMC REP. ALIGNMENT
WITNESSED BY
CPAI PRODUCTION PAD OPERATOR.
0.0 0.0
10/25/2022
08:30
10/25/2022
12:00
3.50 SLOT, WELLPR NUND P INSTALL 11X13" ADAPTER FLANGES
AND INSTALL SPACER SPOOLS,
GATHER RKB'S AND
NIPPLE UP BOP'S
0.0 0.0
10/25/2022
12:00
10/25/2022
15:30
3.50 SLOT, WELLPR NUND P CONT. NIPPLE UP BOP'S INSTALL
MPD RCD HEAD, AIR VALVE AND ALL
1502 HOSES AND
CONNECTIONS. HOOK UP CHOKE
AND KILL LINES. SIMOPS CHANGE
OUT SAVER SUB TO
NC-50.
0.0 0.0
10/25/2022
15:30
10/25/2022
17:00
1.50 SLOT, WELLPR RURD P CONT C/O SAVER SUB F/ XT-39 T/ NC
-50. SIMOPS C/O ST-100 DIES.
0.0 0.0
10/25/2022
17:00
10/25/2022
17:30
0.50 SLOT, WELLPR PRTS P PRESSURE TEST MPD T/ 250/1250
PSI F/ 5 MIN. CHARTED. SIMOPS
TEST GAS ALARMS
0.0 0.0
10/25/2022
17:30
10/25/2022
18:00
0.50 SLOT, WELLPR PRTS P PRESSURE TEST WELL HEAD AND
WELL HEAD VALVES TO 2000 PSI
CHARTED. 5 MIN
0.0 0.0
10/25/2022
18:00
10/25/2022
20:15
2.25 SLOT, WELLPR NUND P REMOVE MPD TEST CAP, INSTALL
MPD RISER. SIMOPS- PUMP OUT
BOP STACK
0.0 0.0
10/25/2022
20:15
10/25/2022
20:30
0.25 SLOT, WHDBOP BOPE P INSTALL TEST PLUG PER FMC REP 0.0 0.0
10/25/2022
20:30
10/25/2022
21:45
1.25 SLOT, WHDBOP BOPE P R/U TO TEST BOPE 0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 41/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/25/2022
21:45
10/26/2022
00:00
2.25 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW
5,000 HIGH FOR 5 CHARTED MIN. W/
EXCEPTION OF
MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI AND ANNULAR
PREVENTER T/ 3,500 PSI FOR 5
CHARTED MIN, W/ 7" TEST JT TEST
ANNULAR, 4 1/2" X 7"
UPR, W/ 5" TEST JT TEST 4 1/2" X 7"
UPR & 3 1/2" X 6" LPR, TEST CHOKE
VALVES 1-15,
MANUAL OPERATED & SUPER
CHOKE, CHOKE & KILL MANUALS &
HCR'S, 4" VALVE ON KILL
LINE, 5" FOSV X2, 5" DART VALVE,
UPPER & LOWER IBOP; BLIND/
SHEAR RAMS
0.0 0.0
10/26/2022
00:00
10/26/2022
02:00
2.00 SLOT, WHDBOP BOPE P CONT. TO TEST BOPE ALL TESTS T/
250 LOW 5,000 HIGH FOR 5
CHARTED MIN. W/ EXCEPTION
OF MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI AND ANNULAR
PREVENTER T/ 3,500 PSI FOR 5
CHARTED MIN, W/ 7" TEST JT TEST
ANNULAR, 4 1/2" X 7" UPR, W/
5" TEST JT TEST ANNULAR, 4 1/2" X
7" UPR & 3 1/2" X 6" LPR, TEST
CHOKE VALVES 1-15,
MANUAL OPERATED & SUPER
CHOKE, CHOKE & KILL MANUALS &
HCR'S, 4" VALVE ON KILL
LINE, 5" FOSV X2, 5" DART VALVE,
UPPER & LOWER IBOP; BLIND/
SHEAR RAMS; PERFORM
KOOMEY DRAWDOWN, ACC = 3100
PSI. MANIF. = 1500 PSI. ACC = 1800
PSI AFTER ALL
FUNCTIONS ON BOTTLES, 8 SEC
FOR 200 PSI. BUILD W/ 2 ELEC.
PUMPS, 67 SEC T/ BUILD FULL
SYS. PRESSURE W/ 2 ELEC. & 2 AIR
PUMPS, CLOSING TIMES ANNULAR =
15 SEC. UPR = 6 SEC.
BLIND / SHEARS = 6 SEC. LPR = 6
SEC. CHOKE HCR = 1 SEC. KILL HCR
= 1 SEC; TEST PVT
GAIN/LOSS AND FLOW OUT ALARMS,
TEST LEL AND H2S ALARMS; AOGCC
REP SEAN SULLIVAN
WAIVED WITNESS @ 0750 HRS on
10/24/22
0.0 0.0
10/26/2022
02:00
10/26/2022
04:45
2.75 SLOT, WELLPR RURD P R/D TESTING EQUIPMENT. SIMOPS-
PULL TEST PLUG AND SET WEAR
RING.
WEAR RING ID= 9 7/8", WEAR RING
LENGTH= 38" CLEAN AND CLEAR
RIG FLOOR
0.0 0.0
10/26/2022
04:45
10/26/2022
05:30
0.75 SLOT, WELLPR BHAH P P/U BAKER RETRIEVAL TOOL AS PER
BAKER REP.
0.0 20.0
10/26/2022
05:30
10/26/2022
07:45
2.25 SLOT, WELLPR TRIP P RIH W/ 5" DP F/ SURFACE T/ 2150'
MD, S/O WT= 96K, S/O WT= 93K.
MONITORING
DISPLACEMENT VIA TRIP TANK
20.0 2,150.0
10/26/2022
07:45
10/26/2022
08:15
0.50 SLOT, WELLPR CIRC P DISP. WELL TO 9.8 PPG BRINE. 320
GPM, 168 PSI, 20 RPM, 1K TQ,
43%,1702 STKS
2,150.0 2,150.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 42/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/26/2022
08:15
10/26/2022
08:45
0.50 SLOT, WELLPR TRIP P RIH F/ 2150' MD T/ 2166' MD.
RETRIEVE TEST PACKER AS PER
BAKER REP. 94K P/U, 97K
S/O, 95K ROT.
2,150.0 2,166.0
10/26/2022
08:45
10/26/2022
12:00
3.25 SLOT, WELLPR TRIP P POOH ON ELEVATOR F/ 2166' MD T/
321' MD. P/U 54K MONITOR DISP. VIA
TT.
2,166.0 321.0
10/26/2022
12:00
10/26/2022
12:45
0.75 SLOT, WELLPR TRIP P POOH ON ELEVATOR F/ 321' MD T/
SURFACE. MONITOR DISP. VIA TT.
L/D BAKER TEST
PACKER AS PER BAKER REP
321.0 0.0
10/26/2022
12:45
10/26/2022
13:45
1.00 SLOT, WELLPR TRIP P L/D BAKER TOOLS, CLEAN AND
CLEAR RIG FLOOR. P/U SLB TOOLS
TO RIG FLOOR.
0.0 0.0
10/26/2022
13:45
10/26/2022
15:45
2.00 SLOT, WELLPR TRIP P P/U AND M/U SLB BHA AS PER SLB
DD. F/ SURFACE T/ 693' MD. S/O 78K.
MONITOR DISP.
VIA TT.
0.0 693.0
10/26/2022
15:45
10/26/2022
17:30
1.75 SLOT, WELLPR TRIP P CONT. RIH F/ 693' MD T/ 2200' MD S/O
98K, MONITOR DISP. VIA TT.
693.0 2,200.0
10/26/2022
17:30
10/26/2022
18:00
0.50 SLOT, WELLPR CIRC P FILL PIPE TEST GYRO AND MWD @
400 GPM, 728 PSI, 44 % F/O.
2,200.0 2,200.0
10/26/2022
18:00
10/26/2022
18:15
0.25 SLOT, WELLPR COCF P WASH F/ 2200' T/ 2229' MD. 3 BPM,
215 PSI, 28% F/O. TAG CEMENT @
2229' MD.
2,200.0 2,229.0
10/26/2022
18:15
10/26/2022
20:15
2.00 SLOT, WELLPR COCF P DRILL CEMENT F/ 2229' MD T/ 2366'
MD @ 400 GPM, 820 PSI, 40 RPM, 3K
TQ, 4-7K WOB, 45%
F/O.
2,229.0 2,366.0
10/26/2022
20:15
10/26/2022
21:30
1.25 SLOT, WELLPR CIRC P CBU @ 400 GPM, 780 PSI, 20 RPM,
1K, 45% F/O RICP. PIPE F/ 2366' MD T/
2335' MD. 102K P/U
99K S/O (ROTATING
2,366.0 2,366.0
10/26/2022
21:30
10/26/2022
22:15
0.75 SLOT, WELLPR CIRC P ROT. AND RECIP F/ 2,365' MD T/
2,336' MD, DISPLACE WELL F/ 9.8#
BRINE TO 10# LSNDM @
400 GPM, 692 PSI, 47% F/O, 20 RPM,
1K TQ. TOTAL STKS PUMPED= 3,920
(394 BBLS).
2,366.0 2,366.0
10/26/2022
22:15
10/26/2022
23:00
0.75 SLOT, WELLPR OTHR P CHANGE SCREENS ON SHAKERS 2,366.0 2,366.0
10/26/2022
23:00
10/27/2022
00:00
1.00 SLOT, WELLPR TRIP P RIH F/ 2,366' MD T/ 2,380' MD, S/O
WT= 106K
SLIDE F/ 2,380' MD T/ 2,390' MD @
500 GPM, 997 PSI, 51% F/O, WOB= 5K
2,366.0 2,380.0
10/27/2022
00:00
10/27/2022
01:30
1.50 SLOT, WELLPR KOST P CONT. TO SLIDE F/ 2,390' MD T/ 2,438'
MD DRILL 20' NEW FORMATION @
450 GPM, 864 PSI, 51% F/O, WOB= 5-
18K
2,390.0 2,438.0
10/27/2022
01:30
10/27/2022
03:00
1.50 SLOT, WELLPR KOST P WORK THROUGH SLIDE F/ 2,438' MD
T/ 2,360' W/ PUMPS ON X2 @ 450
GPM, 778 PSI, 51% F/O,
S/O WT= 113K, P/U WT=103K.
ROTATE THROUGH SLIDE UP AND
DOWN X2 F/ 2,410' MD TO 2,438'
MD @ 40 RPM, 1-4K TQ. WORK
THROUGH SLIDE X1 W/ PUMPS OFF,
S/O WT=114, P/U WT=106K.
NO ISSUES GOING DOWN OR UP
THROUGH SLIDE AND SHOE.
2,380.0 2,360.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 43/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/27/2022
03:00
10/27/2022
03:30
0.50 SLOT, WELLPR CIRC P ROT AND RECIP F/ 2,360' MD T/ 2,263'
MD @ 500 GPM, 941 PSI, 50% F/O, 40
RPM, 1K TQ. VERIFY
MUD WEIGHTS EVEN IN AND OUT.
TOTAL STKS PUMPED= 2881STK
290 BBLS)
2,360.0 2,263.0
10/27/2022
03:30
10/27/2022
04:00
0.50 SLOT, WELLPR RURD P B/D TOP DRIVE, R/U FOR LOT/FIT 2,263.0 2,263.0
10/27/2022
04:00
10/27/2022
04:45
0.75 SLOT, WELLPR FIT P PERFORM LOT TO 15 PPG EMW (627
PSI)
2,263.0 2,263.0
10/27/2022
04:45
10/27/2022
05:15
0.50 SLOT, WELLPR RURD P R/D TESTIING EQUIPMENT, B/D KILL
LINE
2,263.0 2,263.0
10/27/2022
05:15
10/27/2022
05:30
0.25 SLOT, WELLPR SRVY P RIH TO SHOE TAKE SURVEY 2,376.0 2,376.0
10/27/2022
05:30
10/27/2022
12:00
6.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
2,438‘ MD - T/ 2863‘ MD 2849‘ TVD,
WOB = 19, GPM 500=,
PSI ON = 1360, PSI OFF =, RPM =40,
TQ ON = 1.9K, FLOW OUT = 50%,
ECD = PPG, P/U WT =
131K, S/O WT =121K, RT WT = 115K,
AST = 1.14, ART = 3.38, ADT = 4.52,
TOTAL BIT HRS =
6.18, TOTAL JAR HRS = 6.18
2,438.0 2,863.0
10/27/2022
12:00
10/27/2022
13:30
1.50 INTRM1, DRILL SRVY P OBTAIN FINAL SURVEY, CIRCULATE
B/U (1386 TOT. STRKS) OBTAIN
SPR'S.
2,863.0 2,863.0
10/27/2022
13:30
10/27/2022
15:00
1.50 INTRM1, DRILL BKRM P BROOH F/ 2863‘ MD - T/ 2482‘ MD, W/
GPM = 500, PSI = 1080, RPM = 40, TQ
= 2K. F/O = 48%,
P/U WT = 131K, S/O WT = 121K, RT
WT = 115K, RT P/U WT= 107K
2,863.0 2,482.0
10/27/2022
15:00
10/27/2022
16:00
1.00 INTRM1, DRILL CIRC P ROTATE & RECIP. F/ 2482' MD T/
2392'MD, X3 TO CLEAN UP DOG LEG
W/ 500 GPM, 40 RPM,
2K TQ, 50% F/O, 1018 PSI, P/U RT
WT= 102K, S/O RT WT= 112K
2,482.0 2,392.0
10/27/2022
16:00
10/27/2022
16:30
0.50 INTRM1, DRILL CIRC P CIRC. B/U X2 WHILE BROOH F/ 2392'
MD, T/ 2295' MD , @ 500 GPM, 40
RPM, 50% F/O, 1K TQ,
1000 PSI, P/U RT WT= 102K
2,392.0 2,295.0
10/27/2022
16:30
10/27/2022
17:00
0.50 INTRM1, DRILL OWFF P OWFF (STATIC) 2,295.0 2,295.0
10/27/2022
17:00
10/27/2022
19:15
2.25 INTRM1, DRILL TRIP P POOH F/ 2295‘ MD - T/ 707‘ MD, W/ 5”
DP, RK BK IN DRK, P/U WT = 104K,
S/O WT = 102K;
MONITOR DISP. ON TRIP TANK
2,295.0 707.0
10/27/2022
19:15
10/27/2022
19:30
0.25 INTRM1, DRILL OWFF P OWFF (STATIC) 707.0 707.0
10/27/2022
19:30
10/27/2022
23:00
3.50 INTRM1, DRILL BHAH P RACK BK HWDP & JARS, L/D BHA
PER SLB REP.
707.0 0.0
10/27/2022
23:00
10/28/2022
00:00
1.00 INTRM1, DRILL CLEN P CLEAN AND CLEAR FLOOR, BRING
UP PIECES FOR NEXT BHA
SPR’S @ 2860’ MD, 2846’ TVD MW =
9.9+ PPG TIME: 13:15
#1 MP – 30SPM – 220PSI 40SPM –
260PSI
#2 MP – 30SPM – 180PSI 40SPM –
250PSI
0.0 0.0
10/28/2022
00:00
10/28/2022
01:00
1.00 INTRM1, DRILL CLEN P CONT. TO CLEAN AND CLEAR RIG
FLOOR , BRING UP PIECE ON NEXT
BHA
0.0 0.0
10/28/2022
01:00
10/28/2022
02:30
1.50 INTRM1, DRILL BHAH P HOLD PJSM P/U 8 3/4" INTERTM BHA
AS PER SLB REP F/ SURACE TO 550
0.0 550.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 44/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/28/2022
02:30
10/28/2022
05:30
3.00 INTRM1, DRILL TRIP P TIH F/ 550' TO 2863' SHALLOW
TEST DIRECTIONAL TOOLS 2050'
550.0 2,773.0
10/28/2022
05:30
10/28/2022
06:00
0.50 INTRM1, DRILL DDRL P FILL PIPE WASH LAST STAND DOWN
TO 2683'
2,773.0 2,863.0
10/28/2022
06:00
10/28/2022
12:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
2862‘ MD - T/3355 ‘ MD 3320‘ TVD,
WOB =4K, GPM =700,
PSI ON =1760, PSI OFF =1733, RPM
=150, TQ ON = 4K, FLOW OUT =55 %,
ECD =11.98 PPG, P/U
WT =123K, S/O WT = 124K, RT WT =
119K, ADT =3.96, TOTAL BIT HRS
=3.96, TOTAL JAR HRS
=10.14,
SPR’S @ 2900’ MD, 2886’ TVD MW =
10.0 PPG TIME: 06:45
#1 MP – 30SPM – 150 PSI 40SPM –
170 PSI
#2 MP – 30SPM –125 PSI 40SPM –
160 PSI
2,863.0 3,355.0
10/28/2022
12:00
10/28/2022
18:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
3355‘ MD - T/ 3658‘ MD 3593' TVD,
WOB =4K, GPM =700,
PSI ON =1779, PSI OFF =1784, RPM =,
TQ ON = 3K, FLOW OUT = 57%, ECD
=11.85 PPG, P/U
WT = 130K, S/O WT = 131K, RT WT =
126K, ADT =4.94, TOTAL BIT HRS
=8.90, TOTAL JAR HRS
=15.08,
3,355.0 3,658.0
10/28/2022
18:00
10/29/2022
00:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
3,658‘ MD - T/ 4,038‘ MD 3,911‘ TVD,
WOB =5, GPM =700,
PSI ON =1,836, PSI OFF =1,850, RPM
=120, TQ ON = 3K, FLOW OUT = 55%,
ECD = 11.8PPG, P/U
WT = 133K, S/O WT = 135K, RT WT =
133K, ADT =3.81, TOTAL BIT HRS
=12.71, TOTAL JAR HRS
=18.89
SPR’S @ 3,754’ MD, 3,676’ TVD MW =
10.0PPG TIME: 19:15
#1 MP – 30SPM – 200PSI 40SPM –
260PSI
#2 MP – 30SPM – 200PSI 40SPM –
260PSI
3,658.0 4,038.0
10/29/2022
00:00
10/29/2022
06:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
4,038‘ MD TO 4512 3,911‘ TVD, WOB
=5, GPM =700, PSI ON =1,836, PSI
OFF =1,850, RPM =120, TQ ON = 3K,
FLOW OUT = 55%, ECD = 11.8PPG,
P/U WT = 133K, S/O WT = 135K, RT
WT = 133K, ADT =3.81, TOTAL BIT
HRS =12.71, TOTAL JAR HRS =18.89
4,038.0 4,512.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 45/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/29/2022
06:00
10/29/2022
12:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
4512‘ MD - T/ 5089‘ MD 4745‘ TVD,
WOB =11, GPM =700,
PSI ON =2044, PSI OFF =2001, RPM
=80, TQ ON = 2-8K, FLOW OUT = 55%,
ECD =11.94 PPG,
P/U WT = 155K, S/O WT = 147K, RT
WT = 145K, ADT =4.81, TOTAL BIT
HRS =22.03, TOTAL JAR
HRS =28.21,
SPR’S @ 4601’ MD, 4358’ TVD MW =
10.0 PPG TIME: 06:45
#1 MP – 30SPM – 180 PSI 40SPM –
230 PSI
#2 MP – 30SPM – 170 PSI 40SPM –
220 PSI
4,512.0 5,089.0
10/29/2022
12:00
10/29/2022
18:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
5089‘ MD - T/ 5,644‘ MD 5,181‘ TVD,
WOB =11K, GPM
=700, PSI ON =2208, PSI OFF =2123,
RPM =120, TQ ON = 3-10K, FLOW
OUT = 57%, ECD = 12.06
PPG, P/U WT = 116K, S/O WT = 153K,
RT WT = 153K, ADT =4.61, TOTAL BIT
HRS =26.64, TOTAL
JAR HRS =32.82
5,089.0 5,644.0
10/29/2022
18:00
10/30/2022
00:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
5,644‘ MD - T/ 6,304‘ MD 5,699‘ TVD,
WOB =14K, GPM
=700, PSI ON =2,174, PSI OFF =2,152,
RPM =120, TQ ON = 8K, FLOW OUT =
55%, ECD =
11.79PPG, P/U WT = 177K, S/O WT =
160K, RT WT = 155K, ADT =4.61,
TOTAL BIT HRS =31.25,
TOTAL JAR HRS =37.43
SPR’S @ 5,738’ MD, 5,253’ TVD MW =
10.0 PPG TIME: 18:39
#1 MP – 30SPM – 300 PSI 40SPM -
350 PSI
#2 MP – 30SPM – 290 PSI 40SPM -
340 PSI
5,644.0 6,304.0
10/30/2022
00:00
10/30/2022
06:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
6,304‘ MD T/ 6908' 6096‘ TVD, WOB
=14K, GPM =700, PSI ON =2,174, PSI
OFF =2,152, RPM =120, TQ ON = 8K,
FLOW OUT = 55%, ECD = 11.79PPG,
P/U WT = 177K, S/O WT = 160K, RT
WT = 155K, ADT =4.61, TOTAL BIT
HRS =31.25, TOTAL JAR HRS =37.43
@ 6770' DRILL INTO SAND STRINGER
STARTED LOSINGH MUD @ 30/ 60
BPH, STARTED BUILDING LCM
SWEEPS 45 PPB NUT PLUG / SAFE
CARB
6,304.0 6,908.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 46/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/30/2022
06:00
10/30/2022
09:00
3.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
6908‘ MD - T/ 7059‘ MD 6293‘ TVD,
WOB =15, GPM =550,
PSI ON =1550, PSI OFF =1477, RPM
=80, TQ ON = 8K, FLOW OUT = 51%,
ECD = 11.39 PPG, P/U
WT = 190K, S/O WT = 169K, RT WT =
174K, ADT =1.59, TOTAL BIT HRS
=37.14, TOTAL JAR HRS
=43.32 LOSES CONTINUED
INCRESED TO 100 BPH MIXING AND
PUMPING LCM SWEEPS LOSES
DECREASE
TO 30/ 60 BPH AVG.
6,900.0 7,058.0
10/30/2022
09:00
10/30/2022
09:30
0.50 INTRM1, DRILL MPDA P CIRC. B/U PRIOR TO INSTALLING
MPD BEARING @ 7,058' MD, 450
GPM, 80 GPM, 1080 PSI,
49% F/O, 3550 TOTAL STROKES
PUMPED
7,058.0 7,058.0
10/30/2022
09:30
10/30/2022
10:00
0.50 INTRM1, DRILL OWFF P OWFF, CLOSE ANNULAR &
PERFORM DRAWDOWN TO
CONFIRM BALLOONING, ICP 92 PSI,
DRAWDOWN X3, STATIC, TOTAL
RETURNS 3.6 BBLS,
7,058.0 7,058.0
10/30/2022
10:00
10/30/2022
12:00
2.00 INTRM1, DRILL CIRC P SPOT LCM PILL 3BPM, 218 PSI, 28%
F/O, 1256 STRKS@ 7058' MD AND
LET SOAK WHILE
INSTALLING MPD BEARING
SPR’S @ 6964’ MD, 6218’ TVD MW =
10+ PPG TIME: 06:30
#1 MP – 30SPM – 330 PSI 40SPM -
380 PSI
#2 MP – 30SPM – 310 PSI 40SPM -
360 PSI
7,058.0 7,058.0
10/30/2022
12:00
10/30/2022
13:00
1.00 INTRM1, DRILL MPDA P FINISH INSTALLING MPD BEARING
CHECK FLOW PATH THROUGH
CHOKE
7,058.0 7,058.0
10/30/2022
13:00
10/30/2022
18:00
5.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
7059‘ MD - T/ 7390‘ MD 6553‘ TVD,
WOB =14K, GPM =480,
PSI ON =1460, PSI OFF 1425=, RPM =,
TQ ON = 7K, FLOW OUT = 50%, ECD
= 11.41 PPG, P/U
WT = 204K, S/O WT = 172K, RT WT =
174K, ADT =3.72, TOTAL BIT HRS
=40.86, TOTAL JAR HRS
=47.04,
7,058.0 7,390.0
10/30/2022
18:00
10/30/2022
22:30
4.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
7,390‘ MD - T/ 7,644‘ MD 6,752‘ TVD,
WOB =18K, GPM
=480, PSI ON =1,522, PSI OFF =1,519,
RPM =120, TQ ON = 8K, FLOW OUT =
51%, ECD =
11.51PPG, P/U WT = 215K, S/O WT =
177K, RT WT = 180K, ADT =3.66,
TOTAL BIT HRS =44.52,
TOTAL JAR HRS =50.70
7,390.0 7,644.0
10/30/2022
22:30
10/30/2022
22:45
0.25 INTRM1, DRILL TRIP P POOH F/ 7,644' MD T/ 7,628' MD @
480 GPM, 1,387 PSI, 55% F/O, 80
RPM, 5K TQ. ROT P/U=
171K
7,644.0 7,628.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 47/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
10/30/2022
22:45
10/31/2022
00:00
1.25 INTRM1, DRILL CIRC P ROT AND RECIP F/ 7,628' MD T/ 7,534'
MD @ 700 GPM, 2,493 PSI, 59% F/O,
60 RPM, 5K TQ.
PUMP LCM PILL. TOTAL STKS
PUMPED= 5,561 (559 BBLS)
AVG. LOSS PER HR 39 BPH (TOUR
LOSS 933 BBLS)
SPR’S @ 7,436’ MD, 6,588’ TVD MW =
10.0PPG TIME: 18:35
#1 MP – 30SPM – 490/220PSI 40SPM
– 560/230PSI
#2 MP – 30SPM – 500/206PSI 40SPM
– 600/197PSI
7,628.0 7,534.0
10/31/2022
00:00
10/31/2022
00:30
0.50 INTRM1, DRILL MPDA P LINE UP ON # 2 MUD PUMP ON
INJECTION LINE TO BACKSIDE,
CHECK UPS AND RUN PUMP ON
BACKSIDE FOR MPD
7,534.0 7,534.0
10/31/2022
00:30
10/31/2022
07:00
6.50 INTRM1, DRILL BKRM P BROOH F/ 7534' TO 5926' 7,534.0 5,926.0
10/31/2022
07:00
10/31/2022
07:30
0.50 INTRM1, DRILL CIRC P CIRCULATE WHILE ROT/RECIP F/
5926' MD T/ 6018' MD @ 400 GPM, 870
PSI, 90 RPM, 4K TQ,
ROT P/U WT= 162K ROT S/O WT=
157K. 3380 TOTAL STRKS
5,926.0 6,018.0
10/31/2022
07:30
10/31/2022
09:00
1.50 INTRM1, DRILL STRP P BRING PUMP #2 ON T/ MPD F/ STRIP
IN THE HOLE, STRIP IN THE HOLE F/
6018' MD T/ 6900'
MD. S/O WT= 160K
6,018.0 6,900.0
10/31/2022
09:00
10/31/2022
09:30
0.50 INTRM1, DRILL CIRC P @ 6900' MD SPOT 50 BBLS
PROCORE LCM PILL @ 300 GPM, 525
PSI, 37% F/O, 1537 TOTAL
STROKES.
6,900.0 6,900.0
10/31/2022
09:30
10/31/2022
11:00
1.50 INTRM1, DRILL STRP P BRING PUMP #2 ON INJ. LINE, STRIP
OUT @ 1500' PER HR F/ 6900' MD T/
5928' MD,
MONITORING DISPLACEMENT VIA
PITS 1-5, P/U WT= 189K.
6,900.0 5,928.0
10/31/2022
11:00
10/31/2022
12:00
1.00 INTRM1, DRILL SQEZ P PERFORM HESITATION SQUEEZE
WHILE ROTATING @ 5 RPM, 50 PSI
FOR 10 MIN.,
INCREASING IN 50 PSI INCREMENTS
HOLDING PSI AND WATCHING BLEED
OFF.
5,928.0 5,928.0
10/31/2022
12:00
11/1/2022
00:00
12.00 INTRM1, DRILL SQEZ P @ 5,928' MD CONT. T/ PERFORM
HESITATION SQUEEZE WHILE
ROTATING @ 5 RPM, 5K TQ,
50 PSI FOR 10 MIN, INCREASE PSI IN
50 POUND INCREMENTS HOLDING
PSI AND
SQUEEZING FOR 10 MIN. WORK
PRESSURE UP T/ 200 PSI AND
SQUEEZE 5 TIMES.
CONTINUE INCREASING SQUEEZE
PRESSURE UP TO 482 PSI IN 50 PSI
INCREMENTS
ALLOWING TO SQUEEZE FOR 30 MIN
EACH INTERVAL. (OBSERVE SIGNS
OF INJECTIVITY AT
480 PSI). CONTINUE TO SQUEEZE AT
460 PSI FOR 30 MIN EACH INTERVAL.
5,928.0 5,928.0
11/1/2022
00:00
11/1/2022
01:00
1.00 INTRM1, DRILL SQEZ P AT 5,928' MD, CONT. T/ PERFORM
HESITATION SQUEEZE WHILE
ROTATING @ 5 RPM, 5K TQ.
PRESSURE UP TO 460 PSI @ 22:30
(10/31/22) AFTER 2.5 HRS WELLBORE
PRESSURE= 116 PSI (10.4 PPG EWM)
5,928.0 5,928.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 48/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/1/2022
01:00
11/1/2022
04:00
3.00 INTRM1, DRILL CIRC P ROT AND RECIP F/ 5,928' MD T/ 5,835'
MD STAGING FLOW RATE UP TO 700
GPM, 2,103 PSI, 62% F/O, 11.61 ECD,
80 RPM, 5K TQ, ROT P/U WT= 148K,
ROT S/O WT= 163K. NO LOSSES
OBSERVED WHILE CIRCULATING @
700 GPM. PUMP LO VIS/HI VIS
SWEEP TO FLUSH SLB TOOLS.
TOTAL STKS PUMPED= 4356 ( 438
BBLS
5,928.0 5,835.0
11/1/2022
04:00
11/1/2022
04:30
0.50 INTRM1, DRILL CLEN P B/D TOP DRIVE, LINE UP MUD PUMP
#2
5,928.0 5,928.0
11/1/2022
04:30
11/1/2022
06:30
2.00 INTRM1, DRILL STRP P STRIP ON ELEVATORS F/ 5,928' MD T/
7,400' MD, S/O WT= 145, P/U WT=
155. MONITORING DISPLACEMENT
VIA PIT#5 HOLDING 360 PSI IN SLIPS
AND 200 PSI TRIPPING
5,928.0 7,400.0
11/1/2022
06:30
11/1/2022
08:30
2.00 INTRM1, DRILL CIRC P ROTATE/RECIP. F/ 7,400' MD T/ 7,437'
MD 30 RPM, P/U RT WT= 178K S/O RT
WT= 179K, WHILE STAGING PUMPS
UP T/ 650 GPM, 30 RPM, 1730 PSI,
56% F/O.
7,400.0 7,437.0
11/1/2022
08:30
11/1/2022
10:00
1.50 INTRM1, DRILL WASH P WASH/REAM F/ 7,437' MD T/ 7,644'
MD @ 80 RPM, 650 GPM, 2018 PSI,
60% F/O, 7K TQ, RT WT= 182K.
7,437.0 7,644.0
11/1/2022
10:00
11/1/2022
12:00
2.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
7,644‘ MD - T/ 7788‘ MD, 6865‘ TVD,
WOB =15, GPM =600, PSI ON =1889,
PSI OFF =1846, RPM =80, TQ ON = 7-
9K, FLOW OUT = 58%, ECD =11.56
PPG, P/U WT = 215K, S/O WT = 177K,
RT WT = 180K.
ADT =1.64, TOTAL BIT HRS =46.16,
TOTAL JAR HRS =52.34, MPD
CONNECTION BACK PSI = 400
7,644.0 7,788.0
11/1/2022
12:00
11/1/2022
17:30
5.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
7,788‘ MD - T/ 8,167‘ MD 7,167‘ TVD,
WOB =14K, GPM=600, PSI ON =1882,
PSI OFF =1870, RPM =80, TQ ON =
10K, FLOW OUT = 60%, ECD = 11.53
PPG, P/U WT = 218K, S/O WT = 170K,
RT WT = 183K,
ADT =4.39, TOTAL BIT HRS =50.55,
TOTAL JAR HRS =56.73, MPD
CONNECTION BACK PSI = 400
7,788.0 8,167.0
11/1/2022
17:30
11/1/2022
18:00
0.50 INTRM1, DRILL CIRC P ROTATE/RECIP. WHILE CIRCULATING
B/U F/ 8,167' MD T/ 8,095' MD, @ 600
GPM, 80 RPM, 1920 PSI, 6K TQ, P/U
RT WT= 185K, S/O RT WT= 188K.
(6,386 TOTAL STROKES).
8,167.0 8,095.0
11/1/2022
18:00
11/1/2022
19:15
1.25 INTRM1, DRILL OWFF P MONITOR ALPINE C PORE
PRESSURE VIA MPD SYSTEM. TRAP
400 PSI ON WELLBORE, BLEED
DOWN TO 134 PSI, AFTER 17 MIN
PRESSURE BUILDS TO 201 PSI.
BLEED OFF TO 147PSI, AFTER 28
MIN PRESSURE BUILDS TO 206 PSI.
ROT @ 5 RPM, 7K TQ
8,095.0 8,167.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 49/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/1/2022
19:15
11/2/2022
00:00
4.75 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
8,167‘ MD - T/ 8,545‘ MD 7,495‘ TVD,
WOB =12, GPM =600, PSI ON =2,148,
PSI OFF =2,143, RPM =120, TQ ON =
10K, FLOW OUT = 58%, ECD
=11.93PPG, P/U WT = 235K, S/O WT =
178K, RT WT = 192K,
ADT =3.62, TOTAL BIT HRS =54.17,
TOTAL JAR HRS =60.35, MPD
CONNECTION BACK PSI = 380
SPR’S @ 8,281’ MD, 7,258’ TVD MW =
10.3PPG TIME: 20:40
#1 MP – 30SPM – 660/350PSI 40SPM
– 740/330PSI
#2 MP – 30SPM – 580/350PSI 40SPM
– 680/320PSI
8,167.0 8,545.0
11/2/2022
00:00
11/2/2022
06:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
8,545‘ MD TO 8,990' MD, 7861‘ TVD,
WOB =12, GPM=600, PSI ON =2,148,
PSI OFF =2,143, RPM =120, TQ ON =
10K, FLOW OUT = 58%, ECD =
11.93PPG, P/U WT = 235K, S/O WT =
178K, RT WT = 192K,
ADT =4.0, TOTAL BIT HRS =58.17,
TOTAL JAR HRS =64.35, MPD
CONNECTION BACK PSI = 380
8,545.0 8,990.0
11/2/2022
06:00
11/2/2022
12:00
6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
8,990‘ MD TO 9,358' MD, 8,290‘ TVD,
WOB = 16K, GPM = 600, PSI ON =
2,230, PSI OFF = 2,140, RPM =100, TQ
ON = 12K, FLOW OUT = 59%, ECD =
12.14 PPG, P/U WT = 271K, S/O WT =
185K, RT WT = 206K, ADT =4.45,
TOTAL BIT HRS = 63.15, TOTAL JAR
HRS =69.33, MPD CONNECTION
BACK PSI = 380
8,990.0 9,358.0
11/2/2022
12:00
11/2/2022
17:45
5.75 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/
9,358‘ MD TO 9,789' MD, 8,713‘ TVD,
WOB = 14K, GPM= 525, PSI ON =
1,898, PSI OFF = 1,790, RPM = 140,
TQ ON = 15K, FLOW OUT = 60%, ECD
= 12.24 PPG, P/U WT = 295K, S/O WT
= 192K, RT WT = 230K, ADT = 4.6,
TOTAL BIT HRS = 67.75, TOTAL JAR
HRS = 73.93, MPD CONNECTION
BACK PSI = 300
9,358.0 9,789.0
11/2/2022
17:45
11/2/2022
18:15
0.50 INTRM1, DRILL SRVY P OBTAIN FINAL SURVEY, TORQUE
AND DRAG, AND SPRS @ 9,789' MD.
9,789.0 9,789.0
11/2/2022
18:15
11/2/2022
19:15
1.00 INTRM1, CASING CIRC P ROT AND RECIP PIPE FROM 9,789'
MD TO 9,701' MD AT 530 GPM, 1,902
PSI, 56% F/O, 120 RPM, 9K TQ, 12.11
ECD, ROT WT - 209K. WEIGHTING
UP TO 11 PPG. TOTAL STKS
PUMPED = 9,159
9,789.0 9,789.0
11/2/2022
19:15
11/2/2022
20:30
1.25 INTRM1, CASING BKRM P BROOH FROM 9,789' MD TO 9,607'
MD W/ 530 GPM, 1,909 PSI, 60% F/O,
120 RPM, 10K TQ, 12.2 ECD, ROT WT
- 210K.
9,789.0 9,607.0
11/2/2022
20:30
11/2/2022
21:30
1.00 INTRM1, CASING OWFF P B/D TD. OWFF. ROT STRING AT 5
RPM W/ 8K TQ AND SLOWLY BLEED
OFF WELLBORE PSI. CLOSED AIR
VALVE AND OPEN BLOCK VALVE AT
RCD HEAD AND OBSERVE FLOW
DIMINISH TO ZERO.
9,607.0 9,607.0
11/2/2022
21:30
11/2/2022
22:00
0.50 INTRM1, CASING TRIP P RIH ON ELEVATORS F/ 9,607' MD TO
9,789' MD. S/O WT - 191K.
9,607.0 9,789.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 50/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/2/2022
22:00
11/3/2022
00:00
2.00 INTRM1, CASING BKRM P BROOH FROM 9,789' MD TO 9,466 MD
W/ 525 GPM, 1,874 PSI, 58% F/O, 120
RPM, 10K TQ, 12.23 ECD, ROT WT -
207K. HOLDING 250 WHILE IN SLIPS
VIA MPD. CIRC B/U ON FIRST STAND
- TOTAL STKS PUMPED - 5,260.
9,789.0 9,466.0
11/3/2022
00:00
11/3/2022
11:00
11.00 INTRM1, CASING BKRM P BROOH FROM 9,466' MD TO 7,499 MD
W/ 525 GPM, 1,704 PSI, 58% F/O, 120
RPM, 8K TQ, 12.17 ECD, ROT WT -
167K. HOLDING 250 WHILE IN SLIPS
VIA MPD.
9,466.0 7,499.0
11/3/2022
11:00
11/3/2022
13:00
2.00 INTRM1, CASING BKRM T OBSERVE PACKOFF AT 9,466' MD.
KILL PUMPS AND ROT DN @ 20 RPM
TO 7,510' MD. STAGE PUMPS UP IN
½ BBL INCREMENTS EVERY 5 MIN
ICP - 140 W/ 28% F/O, UP TO 530
GPM FCP - 1592 W/ 60% F/O.
INCREASE ROTATION F/ 20 RPM
STAGING UP TO 110 RPM W/ 6K TQ.
7,499.0 7,510.0
11/3/2022
13:00
11/3/2022
15:30
2.50 INTRM1, CASING BKRM T BROOH F/ 7,510' MD T/ 7,441' MD
WORKING THROUGH PACKOFF
AREA WITH 530 GPM, 1600 PSI, 110
RPM, 6-7K TQ, 56% F/O, ECD - 11.98,
ROT P/U WT - 168K
7,510.0 7,441.0
11/3/2022
15:30
11/3/2022
15:45
0.25 INTRM1, CASING TRIP T STOP ROT. LOWER FLOW RATE T/
350 GPM, 800 PSI. S/O THROUGH
PACKOFF AREA F/ 7,441' MD T/ 7,513'
MD.
7,441.0 7,513.0
11/3/2022
15:45
11/3/2022
20:30
4.75 INTRM1, CASING BKRM P BROOH F/ 7,513' MD T/ 7,063' MD W/
530 GPM, 1560 PSI, 58% F/O, 110
RPM, 6K TQ, ECD - 12.07. MPD PSI
WHILE IN SLIPS - 250
7,513.0 7,063.0
11/3/2022
20:30
11/3/2022
21:00
0.50 INTRM1, CASING SMPD P B/D TD. STRIP OUT OF THE HOLE F/
7,063' MD T/ 6,958' MD. OBSERVE 30K
OVERPULL AT 6,958' MD. ATTEMPT
TO WORK BY OBSTRUCTION (X3)
(FAILED).
7,063.0 6,958.0
11/3/2022
21:00
11/3/2022
22:00
1.00 INTRM1, CASING BKRM T RIH F/ 6,958' MD T/ 7,063' MD ON
ELEVATORS. S/O WT - 154K. KELLY
UP AND BROOH F/ 7,063' MD T/ 6,968'
MD AT 530 GPM, 1500 PSI, 54% F/O,
110 RPM, 6K TQ, 164K HOOK LOAD
WHILE PULLING PIPE. TOTAL STKS
PUMPED - 5549
7,063.0 6,958.0
11/3/2022
22:00
11/3/2022
23:30
1.50 INTRM1, CASING SMPD P PUMP OUT OF THE HOLE AT 300
GPM, 525 PSI, 38% F/O, NO
ROTATION, F/ 6,958' MD T/ 6,497' MD.
190k UP WT. MPD - 250 @
CONNECTIONS.
6,958.0 6,497.0
11/3/2022
23:30
11/4/2022
00:00
0.50 INTRM1, CASING BKRM P BROOH F/ 6,497' MD TO 6,405' MD W/
530 GPM, 1490 PSI, 110 RPM, 6K TQ,
58% F/O. ECD - 12.04. P/U RT WT -
163K. MPD - 250 @ CONNECTIONS.
6,495.0 6,405.0
11/4/2022
00:00
11/4/2022
06:00
6.00 INTRM1, CASING BKRM P BROOH F/ 6,405' MD TO 4,416' MD W/
530 GPM, 1260 PSI, 110 RPM, 4K TQ,
58% F/O. ECD - 12.16. P/U RT WT -
123K. MPD - 250 @ CONNECTIONS.
6,495.0 4,416.0
11/4/2022
06:00
11/4/2022
14:30
8.50 INTRM1, CASING BKRM P BROOH F/ 4,416' MD TO 2,811' MD W/
530 GPM, 1090 PSI, 110 RPM, 2-3K
TQ, 58% F/O. ECD - 11.95. P/U RT
WT - 123K. MPD - 170 @
CONNECTIONS. OBSERVE
INDICATIONS OF PACKOFFS @ 2,825'
MD
4,416.0 2,811.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 51/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/4/2022
14:30
11/4/2022
15:00
0.50 INTRM1, CASING BKRM T RIH F/ 2,811 TO 2,904' MD AND PUMP
BIT BALLING SWEEPS FOLLOWED
BY HI-VIS SWEEP. CONTINUE TO
BROOH @ 200 FT/HR F/ 2,904' MD T/
2,809' MD W/ 530 GPM, 1060 PSI, 110
RPM, 2-3K TQ, 58% F/O. ECD - 11.95.
P/U RT WT - 112K
2,904.0 2,809.0
11/4/2022
15:00
11/4/2022
17:00
2.00 INTRM1, CASING BKRM P BROOH F/ 2,809' MD TO 2,561' MD W/
530 GPM, 1040 PSI, 160 RPM, 2K TQ,
58% F/O. ECD - 12.07. P/U RT WT -
108K. MPD - 150 @ CONNECTIONS.
2,809.0 2,561.0
11/4/2022
17:00
11/4/2022
18:30
1.50 INTRM1, CASING BKRM T AT 2,651' MD OBSERVE TQ
INCREASE TO 13K AND OVERPULL
OF 25K W/O ANY PUMP INCREASE.
S/O, STOP ROTARY & ATTEMPT TO
PULL W/ NO ROTATION (FAILED).
ATTEMPT W/ 80 RPM AT 530 GPM
(FAILED). ATTEMPT W/ 300 GPM, 20
RPM (FAILED). INCREASE RATE TO
530 GPM, 1000 PSI, 60% F/O, 80 RPM,
1K TQ AND SLOWLY WORK PAST
OBSTRUCTION UP TO 2,520' MD
2,561.0 2,520.0
11/4/2022
18:30
11/4/2022
20:00
1.50 INTRM1, CASING BKRM P BROOH F/ 2,520' MD TO 2,338' MD W/
530 GPM, 1030 PSI, 80 RPM, 1-2K TQ,
58% F/O, ECD - 12.24. UP WT - 102K.
MPD - 150 AT CONNECTIONS
2,520.0 2,338.0
11/4/2022
20:00
11/4/2022
20:45
0.75 INTRM1, CASING CIRC P ROT AND RECIP PIPE F/ 2,338' MD T/
2,241' MD W/ 530 GPM, 1050 PSI, 58%
F/O, 50 RPM, 1K TQ, ECD - 12.20. UP
WT - 97K. S/O WT - 99K, ROT WT -
104K. PUMP NUT PLUG SWEEP
FOLLOWED BY HI-VIS. NOTING
MINIMAL RETURNS AT SURFACE.
TOTAL STKS PUMPED - 5791.
2,338.0 2,338.0
11/4/2022
20:45
11/4/2022
21:15
0.50 INTRM1, CASING STRP T STRIP IN THE HOLE F/ 2,338' MD TO
2,524' MD. MPD PSI @ 60 PSI. STRIP
OUT OF THE HOLE F/ 2,524' MD T/
2,338' MD. MPD PSI @ 100.
DRIFTING BIT - BHA PAST PROBLEM
ZONE.
2,338.0 2,338.0
11/4/2022
21:15
11/4/2022
22:45
1.50 INTRM1, CASING STRP P STRIP OOH F/ 2,338' MD T/ 581' MD.
MPD PSI - 80. UP WT - 101K.
MONITOR DISP VIA ACTIVE PIT
SYSTEM.
2,338.0 581.0
11/4/2022
22:45
11/4/2022
23:30
0.75 INTRM1, CASING OWFF P OWFF - SIMOPS - PJSM FOR MPD
BEARING REMOVAL
581.0 581.0
11/4/2022
23:30
11/5/2022
00:00
0.50 INTRM1, CASING MPDA P REMOVE MPD BEARING AND
INSTALL TRIP NIPPLE
581.0 581.0
11/5/2022
00:00
11/5/2022
00:30
0.50 INTRM1, CASING MPDA P REMOVE MPD BEARING AND
INSTALL TRIP NIPPLE
581.0 581.0
11/5/2022
00:30
11/5/2022
03:30
3.00 INTRM1, CASING BHAH P L/D INTERMEDIATE BHA F/ 581' MD
AS PER SLMB REP. MONITOR DISP
VIA TT.
581.0 0.0
11/5/2022
03:30
11/5/2022
04:30
1.00 INTRM1, CASING WWWH P M/U STACK FLUSHING TOOL AND
FLUSH STACK W/ 838 GPM, 35 PSI,
58% F/O. 20 RPM. B/D TD. SIMOPS -
CLEAR AND CLEAN RIG FLOOR -
MOBILIZE 7" CSG EQUIPMENT TO
THE RIG FLOOR.
0.0 0.0
11/5/2022
04:30
11/5/2022
05:00
0.50 INTRM1, CASING RURD P M/U TEST JT AND WEAR RING
PULLER. DRAIN BOP STACK. PULL
WEAR BUSHING PER FMC
0.0 0.0
11/5/2022
05:00
11/5/2022
06:00
1.00 INTRM1, CASING RURD P P/U & M/U 7" LANDING JT TO
HANGER. MAKE DUMMY RUN. L/D
SAME.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 52/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/5/2022
06:00
11/5/2022
08:00
2.00 INTRM1, CASING RURD P R/U TO RUN RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG.
0.0 0.0
11/5/2022
08:00
11/5/2022
08:15
0.25 INTRM1, CASING SFTY P PJSM WITH RIG CREW, DOYON CSG,
& CPAI SUPERVISOR ON RUNNING
CSG.
0.0 0.0
11/5/2022
08:15
11/5/2022
09:30
1.25 INTRM1, CASING PUTB P P/U AND M/U 7" 26# L-80 HYD563
SHOE TRACK TO 168' MD.
BAKERLOC TO PIN OF JT# 4. CHECK
FLOATS (GOOD)
0.0 168.0
11/5/2022
09:30
11/5/2022
15:00
5.50 INTRM1, CASING PUTB P CONT TO RIH F/ 168' MD T/ 2,630' MD
W/ RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG AS PER TALLY
DETAIL. S/O WT - 98K FILLING ON
THE FLY AND TOPPING OFF EVERY
10 JTS. MONITOR DISP VIA PIT #5.
TQ CONNECTIONS TO 9.4K FT/ LBS
VIA THE VOLANT CRT.
168.0 2,630.0
11/5/2022
15:00
11/5/2022
15:30
0.50 INTRM1, CASING CIRC P STAGE UP PUMPS IN 1 BBL
INCREMENTS T/ 6 BPM. ICP - 33,
FCP - 113 W/ 35% F/O. TOTAL STKS
PUMPED - 1211 (2X BU)
2,630.0 2,630.0
11/5/2022
15:30
11/5/2022
21:15
5.75 INTRM1, CASING PUTB P CONT TO RIH F/ 2,630 MD T/ 5,174''
MD W/ RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG AS PER TALLY
DETAIL. S/O WT - 135K FILLING ON
THE FLY AND TOPPING OFF EVERY
10 JTS. MONITOR DISP VIA PIT #5.
TQ CONNECTIONS TO 9.4K FT/ LBS
VIA THE VOLANT CRT.
2,630.0 5,174.0
11/5/2022
21:15
11/5/2022
22:30
1.25 INTRM1, CASING CIRC P RECIP PIPE F/ 5,174' MD TO 5,141'
MD & CIRC B/U STAGING PUMPS UP
TO 6 BPM, ICP - 101, FCP - 330 W/
33% F/O. TOTAL STKS PUMPED -
3728 (1450 @ 6 BPM). UP WT - 145K,
S/O WT - 134K
5,174.0 5,174.0
11/5/2022
22:30
11/6/2022
00:00
1.50 INTRM1, CASING PUTB P CONT TO RIH F/ 5,174' MD T/ 5,716'
MD W/ RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG AS PER TALLY
DETAIL. S/O WT - 146K FILLING ON
THE FLY AND TOPPING OFF EVERY
10 JTS. MONITOR DISP VIA PIT #5.
TQ CONNECTIONS TO 9.4K FT/ LBS
VIA THE VOLANT CRT.
5,174.0 5,719.0
11/6/2022
00:00
11/6/2022
02:15
2.25 INTRM1, CASING PUTB P CONT TO RIH F/ 5,716' MD T/ 7,460'
MD W/ RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG AS PER TALLY
DETAIL. S/O WT - 155K FILLING ON
THE FLY AND TOPPING OFF EVERY
10 JTS. MONITOR DISP VIA PIT #5.
TQ CONNECTIONS TO 9.4K FT/ LBS
VIA THE VOLANT CRT.
5,719.0 7,460.0
11/6/2022
02:15
11/6/2022
06:30
4.25 INTRM1, CASING CIRC P RECIP PIPE F/ 7,460' MD TO 7,421'
MD & CIRC B/U STAGING PUMPS UP
TO 5 BPM, ICP - 330, FCP - 485 W/
32% F/O. UP WT - 186K, S/O WT -
158K. TOTAL STKS PUMPED - 9439.
7,460.0 7,460.0
11/6/2022
06:30
11/6/2022
13:30
7.00 INTRM1, CASING PUTB P CONT TO RIH F/ 7,460' MD T/ 9,624'
MD W/ RUN 7" 26# L-80 HYD563
INTERMEDIATE CSG AS PER TALLY
DETAIL. S/O WT - 168K FILLING ON
THE FLY AND TOPPING OFF EVERY
10 JTS. MONITOR DISP VIA PIT #5.
TQ CONNECTIONS TO 9.4K FT/ LBS
VIA THE VOLANT CRT.
7,460.0 9,624.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 53/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/6/2022
13:30
11/6/2022
14:30
1.00 INTRM1, CASING PUTB P M/U 9.57' AND 4.65' PUPS AND RIH.
C/O VOLANT CUP SEAL. M/U
HANGER TO LANDING JT AND RIH.
SET DN 50K @ 9,768' MD.
9,624.0 9,768.0
11/6/2022
14:30
11/7/2022
00:00
9.50 INTRM1, CASING PUTB T ATTEMPT TO LAND HANGER PAST
9,768' MD (FAILED). WORK STRING
TO ACHIEVE CIRCULATION (FAILED).
INCREASE PSI LIMITIATION TO 600,
WORK STRING IN AN ATTEMPT TO
REGAIN CIRCULATION.
SUCCESSFULLY LAND HANGER AT
9779' MD. UNSUCCESSFULL ON
ACHIEVING CIRCULATION. 290 BBLS
PUMPED AWAY.
9,768.0 9,779.0
11/7/2022
00:00
11/7/2022
08:30
8.50 INTRM1, CASING PUTB T CONT TO ATTEMPT GAINING
CIRCULATION. WORKING STRING F/
9,779' MD T/ 9,700' MD. PUMPING ON
THE UPSTROKE @ 1 BPM, 350 - 600
PSI, UP WT - 260K, S/O WT - 177K..
9,768.0 9,779.0
11/7/2022
08:30
11/7/2022
16:00
7.50 INTRM1, CASING PUTB T L/D LANDING JT. L/D HANGER, P/U
WORKING JT. ROT AND RECIP PIPE
F/ 9,779' MD T/ 9,693' MD W/ 12 RPM
18K TQ, 258K P/U WT, 225K S/O WT, 2
BPM ON THE UP STROKE NOT
EXCEEDING 600 PSI. ½ BPM ON THE
DOWN STROKE NOT EXCEEDING
500 PSI, ATTEMPTING TO ESTABLISH
CIRCULATION.
9,779.0 9,779.0
11/7/2022
16:00
11/7/2022
17:00
1.00 INTRM1, CASING PUTB T L/D WORKING SINGLE. M/U HANGER
AND LANDING JT PER CSG AND FMC
REPS. RIH AND LAND ON DEPTH @
9,779' MD. S/O WT - 199K OBSERVE
PSI SPIKE AND UNABLE TO INJECT.
9,779.0 9,779.0
11/7/2022
17:00
11/7/2022
19:00
2.00 INTRM1, CASING PUTB T POOH F/ 9,779' MD T/ 9,735' MD AND
REMOVE HANGER AND LANDING JT.
L/D 4.65' PUP FROM STRING. M/U
HANGER AND LANDING JT & RIH T/
9,775' MD AND LAND ON DEPTH. UP
WT - 268K, S/O WT - 146K.
9,779.0 9,775.0
11/7/2022
19:00
11/7/2022
19:30
0.50 INTRM1, CASING CIRC T CIRC TO ESTABLISH INJECTION
RATE. 148 GPM, 3.5 BPM, 650 PSI,
920 TOTAL STKS PUMPED.
9,775.0 9,775.0
11/7/2022
19:30
11/7/2022
21:15
1.75 INTRM1, CEMENT CIRC P B/D TD, R/U CEMENT HOSE TO THE
VOLANT CRT. CIRC @ 2 BPM, 400
PSI - SIMOPS - PJSM WITH RIG
CREW, SLMB CEMENTERS, DDI TP,
CPAI RIG SUPERVISOR.
9,775.0 9,775.0
11/7/2022
21:15
11/8/2022
00:00
2.75 INTRM1, CEMENT CMNT P PT LINES WITH WATER AND TEST TO
650 LOW, 3500 HIGH (GOOD). PUMP
40 BBLS 12 PPG MUD PUSH @ 3
BPM, ICP - 483, FCP - 450. PUMP
132.7 BBLS OF 13 PPG LEAD
CEMENT @ 4 BPM, ICP - 274, FCP -
320, PUMP 25 BBLS OF 15.6 PPG TAIL
CEMENT @ 4 BPM, 50 PSI. DROP
SHUT OFF PLUG AND KICK OUT W/
10 BBLS OF WATER. CHASE PLUG
WITH 135 BBLS OF 14 PPG LSND
FROM THE PITS @ 6 BPM, ICP - 110
PSI, FCP - 281. PUMP 11 PPG LSND
@ 5 BPM, ICP - 75.
9,775.0 9,775.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 54/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/8/2022
00:00
11/8/2022
01:15
1.25 INTRM1, CEMENT CMNT P CONT TO CHASE PLUG WITH PUMP
11 PPG LSND @ 5 BPM, ICP - 75. FCP
- 500. SLOW RT TO 3 BPM, 375 PSI
AND LAND PLUG @ 3490 STKS. CIP
@ 00:39 HRS. PRESSURE UP TO 800
PSI AND HOLD FOR 5 MIN, BLEED
OFF TO CHECK FLOATS. OBSERVE
FLOATS NOT HOLDING.
9,775.0 9,775.0
11/8/2022
01:15
11/8/2022
02:00
0.75 INTRM1, CEMENT CMNT T RE-PRESSURE UP TO 800 PSI.
BLEED AND CONFIRM FLOATS NOT
HOLDING. RIG UP JUMPER HOSE TO
STAND PIPE. APPLY 500 PSI AND
MONITOR PRESSURES. - SIMOPS -
B/D CEMENT LINE AND CLEAN
CEMENT VALVES.
9,775.0 9,775.0
11/8/2022
02:00
11/8/2022
12:00
10.00 INTRM1, CEMENT WOC P WAIT ON CEMENT COMPRESSIVE
STRENGHT TO REACH 100.
OBSERVE PSI BUILD TO 650 AND
BLEED BACK TO 480 AS NEEDED.
SIMOPS - CLEAN MUD MANIFOLD
CEMENT VALVES. WORK RIG PM'S
AND ORGANIZATION AROUND THE
RIG. C/O MCWS ANTENNA FOR
MCWS.
9,775.0 9,775.0
11/8/2022
12:00
11/8/2022
13:00
1.00 INTRM1, CEMENT RURD P BLEED PSI, CHECK FLOATS (GOOD).
B/O VOLANT CRT AND SERVICE. M/U
VOLANT CRT.
9,775.0 9,775.0
11/8/2022
13:00
11/8/2022
14:00
1.00 INTRM1, CEMENT PACK P PRESSURE UP TAM-PKR PER
HALLIBURTON REP. ESTABLISH
BASELINE PRESSURE OF 580 PSI.
EVERY 2-3 MIN INCREASE PSI 200
LBS @ 15 SPM. INCREASE T/ 692
AND HOLD (NO PSI DROP).
INCREASE TO 889 AND HOLD (NO
PSI DROP), INCREASE TO 1043 AND
HOLD, OBSERVE PSI DROP TO 1033.
INCREASE TO 1145 AND HOLD,
OBSERVE DROP TO 1135. INCREASE
TO 1252 OBSERCVE DROP TO 1246.
INCREASE TO 1462 AND HOLD,
OBSERVE DROP TO 1452. BLEED
DOWN TO BASELINE PSI OF 600.
9,775.0 9,775.0
11/8/2022
14:00
11/8/2022
14:15
0.25 INTRM1, CEMENT CIRC P OPEN UP LOWER STAGE COLLAR
PER HALLIBURTON REP. PUMP AT 3
BPM, 126 GPM, AND OBSERVE SHIFT
OPEN AT 2079 PSI.
9,775.0 9,775.0
11/8/2022
14:15
11/8/2022
18:00
3.75 INTRM1, CEMENT CIRC P CIRC AT 3 BPM 375 PSI, 23% F/O.
OBSERVE LOSS RATE OF 3 BPH.
INCREASE RATE TO 4 BPH AND
OBSERVE 20 BPH LOSS RATE,
DECREASE RATE TO 2 BPH AND
OBSERVE 3 BPH LOSS RATE.
9,775.0 9,775.0
11/8/2022
18:00
11/8/2022
22:00
4.00 INTRM1, CEMENT CIRC P R/U CEMENT HOSE AND MANIFOLD
FOR CEMENT JOB. CONT TO CIRC
VIA THE CEMENT LINE AT 3 BPM, 127
GPM, 26% F/O, 272 PSI. TOTAL STKS
PUMPED - 5000
9,775.0 9,775.0
11/8/2022
22:00
11/9/2022
00:00
2.00 INTRM1, CEMENT CMNT P PJSM WITH ALL HANDS INVOLVED.
PT LINES TO 630 LOW, 3500 HIGH
(GOOD). PUMP 32.1 BBLS 11.0 PPG
MUD PUSH AT 3 BPM, ICP - 280 FCP -
270 W/ 26% F/O. PUMP 165.7 BBLS
OF 11.0 PPG CEMENT @ 3 BPM, ICP -
300 FCP - 280 W/ 26% F/O. DROP
DART.
9,775.0 9,775.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 55/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/9/2022
00:00
11/9/2022
01:00
1.00 INTRM1, CEMENT CMNT P KICK OUT DART W/ 10 BBLS OF
WATER @ 3 BPM, 290 PSI, 26% F/O.
PUMP 75 BBLS OF 11.0 LSND @ 3
BPM, ICP - 313, FCP - 414, PUMP 55
BBLS OF 11.0 CONTAM PILL @ 3
BPM, ICP - 414, SLOW RT TO 2.5
BPM, FCP - 261, PUMP 11.0 PPG
LSND TO BUMP PLUG @ 2 BPM, ICP -
461, FCP - 475. BUMP PLUG @ 1639
STKS. CIP @ 01:08 HRS. OBSERVE
30 BBLS OF CEMENT TO SURFACE.
9,775.0 9,775.0
11/9/2022
01:00
11/9/2022
01:15
0.25 INTRM1, CEMENT CIRC P PRESSURE UP TO 1800 AND HOLD.
BLEED OFF PSI AND FLOW CHECK
(STATIC). RE-PRESSURE UP TO 3390
PSI AND OBSERVE UPPER STAGE
TOOL SHIFT OPEN W/ 25% RETURN
FLO.
9,775.0 9,775.0
11/9/2022
01:15
11/9/2022
06:00
4.75 INTRM1, CEMENT CIRC P CIRC OUT CEMENT FROM ANNULUS
BY STAGE PUMPS UP TO 210 GPM,
ICP - 428 W/ 29% F/O, FCP - 300 W/
31% F/O PUMP CONTAM PILL
FOLLOWED BY HI VIS S/S. TOTAL
STKS PUMPED - 11,165. DUMPED 77
TOTAL BBLS TO THE ROCKWASHER.
9,775.0 9,775.0
11/9/2022
06:00
11/9/2022
08:15
2.25 INTRM1, CEMENT RURD P L/D LANDING JT. REMOVE BAIL
EXTRENSIONS. C/O ELEVATORS TO
5". CLEAR RIG FLOOR OF 7"
HANDLING EQUIPMENT.
9,775.0 9,775.0
11/9/2022
08:15
11/9/2022
09:00
0.75 INTRM1, CEMENT WWWH P M/U STACK FLUSHING TOOL. FLUSH
STACK W/ 900 GPM, MAKING 5
PASSES, FUNCTION ALL RAMS &
ANNULAR, AND WASH STACK AGAIN
AT SAME RATE.
9,775.0 9,775.0
11/9/2022
09:00
11/9/2022
10:30
1.50 INTRM1, CEMENT RURD P R/D STACK FLUSHING TOOL. R/U
LANDING JT, 5" PUP, AND XO. KELLY
UP TO TD.
9,775.0 9,775.0
11/9/2022
10:30
11/9/2022
13:30
3.00 INTRM1, CEMENT CLEN P CLEAN OUT ROCKWASHER, PITS,
TROUGH, FLOW LINE, WHILE
WAITING ON OBM FOR FREEZE
PROTECT.
9,775.0 9,775.0
11/9/2022
13:30
11/9/2022
17:00
3.50 INTRM1, CEMENT CIRC P CIRC VIA PITS 1-5 @ 3 BPM, 163 PSI,
27% F/O. TOTAL STKS - 5536
9,775.0 9,775.0
11/9/2022
17:00
11/9/2022
18:00
1.00 INTRM1, CEMENT FRZP P PUMP HI VIS OBM SPACER (35
BBLS), FOLLOWED BY 85BBLS OF
11.0 PPG OBM @ 6 BPM, 250 GPM,
350 PSI, 35% F/O. DROP CLOSING
PLUG. CHASE PLUG @ 6 BPM, 250
GPM, 550 PSI, 38% F/O. PLUG ON
SEAT AT 977 STKS. PRESSURE UP
TO 1700 PSI. OBSERVE FLOW OUT
REDUCE TO 0 CONFIRMING UPPER
STAGE TOOL CLOSED. BLEED OFF
PSI. OWFF (STATIC)
9,775.0 9,775.0
11/9/2022
18:00
11/9/2022
19:00
1.00 INTRM1, CEMENT RURD P L/D 5" PUP, XO, AND LANDING JT. 9,775.0 9,775.0
11/9/2022
19:00
11/9/2022
20:00
1.00 INTRM1, CEMENT WWWH P M/U STACK FLUSHING TOOL AND
FLUSH STACK WITH FRESH WATER.
R/D FLUSHING TOOL B/D TD.
9,775.0 9,775.0
11/9/2022
20:00
11/9/2022
21:00
1.00 INTRM1, WHDBOP WWSP P P/U 4½ TEST JT. SET 9 5/8" X 7"
PACKOFF AS PER FMC REP. TEST
TO 5000 PSI FOR 10 MIN (GOOD).
WITNESSED BY CPAI RIG MANAGER.
9,775.0 9,775.0
11/9/2022
21:00
11/9/2022
23:00
2.00 INTRM1, WHDBOP RURD P C/O 4½ IF SAVER SUB TO XT-39.
SIMOP - CHANGE UPPER VBR'S TO 2
7/8" X 5".
9,775.0 9,775.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 56/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/9/2022
23:00
11/9/2022
23:45
0.75 INTRM1, WHDBOP BOPE P SET TEST PLUG W/ 4½ TEST JT AS
PER FMC. FLOOD STACK AND
SURFACE LINES W/ WATER.
PERFORM SHELL TEST (GOOD).
9,775.0 9,775.0
11/9/2022
23:45
11/10/2022
00:00
0.25 INTRM1, WHDBOP BOPE P TEST ANNULAR TO 250 LOW, 2500
HIGH FOR 5/5 CHARTED MIN W/ 4½
TEST JT. AOGCC REP BRIAN BIXBY
WAIVED WITNESS TO THE TEST.
9,775.0 9,775.0
11/10/2022
00:00
11/10/2022
09:00
9.00 INTRM1, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW
4,200 HIGH FOR 5 CHARTED MIN. W/
EXCEPTION OF
MANUAL OPERATED & SUPER
CHOKE TESTED T/ 250 LOW & 2,000
PSI FOR 5 CHARTED MIN,
W/ 4 1/2" TEST JT TEST ANNULAR, 2
7/8" X 5" UPR, AND 3 1/2" X 6" LOWER
VBR'S, W/ 2 7/8"
TEST JT, TEST 2 7/8" X 5" UPR &
ANNULAR, W/ 4" TEST JT, TEST 3 1/2"
X 6" LOWER VBR'S,
TEST CHOKE VALVES 1-15, MANUAL
OPERATED & SUPER CHOKE,
CHOKE & KILL MANUALS
& HCR'S, 4" VALVE ON KILL LINE, 4"
FOSV X 2, 4" DART VALVE, UPPER &
LOWER IBOP; BLIND/
SHEAR RAMS; PERFORM KOOMEY
DRAWDOWN, ACC = 3000 PSI.
MANIFOLD. = 1550 PSI. ACC = 1550
PSI AFTER ALL FUNCTIONS ON
BOTTLES, 8 SEC FOR 200 PSI. BUILD
W/ 2 ELEC. PUMPS, 88 SEC T/ BUILD
FULL SYS. PRESSURE W/ 2 ELEC. &
2 AIR PUMPS, CLOSING TIMES
ANNULAR = 22 SEC. UPR = 7 SEC.
BLIND / SHEARS = 6 SEC. LPR = 6
SEC. CHOKE HCR = 2 SEC. KILL HCR
= 2 SEC; TEST PVT GAIN/LOSS AND
FLOW OUT ALARMS, TEST LEL AND
H2S
ALARMS AOGCC REP BRIAN BIXBY
WAIVED WITNESS @ 2300 HRS on
11/09/2022
9,775.0 9,775.0
11/10/2022
09:00
11/10/2022
10:00
1.00 INTRM1, WHDBOP RURD P PULL TEST PLUG AND INSTALL 6.937"
ID WEAR BUSHING AS PER FMC.
BLOW DOWN CHOKE MANIFOLD,
KILL LINE, AND CHOKE LINE.
9,775.0 9,775.0
11/10/2022
10:00
11/10/2022
12:00
2.00 INTRM1, WHDBOP PULD P L/D 12 STDS OF 5" DP F/ DERRICK
VIA TOP DRIVE AND TUGGER.
SIMOPS - MOBILIZE TOOLS FOR
UPCOMING BHA. SURFACE BREAK
MWD TOOL AND RETURN THE THE
SHED.
9,775.0 9,775.0
11/10/2022
12:00
11/10/2022
15:00
3.00 INTRM1, WHDBOP SLPC P SLIP AND CUT 87' (6 WRAPS) OF
1.375 DRILL LINE. CALIBRATE
BLOCKS AND HOOKLOAD.
9,775.0 9,775.0
11/10/2022
15:00
11/10/2022
16:00
1.00 INTRM1, DRILLOUT BHAH P P/U 6 1/8" CLEAN OUT BHA AS PER
SLMB DD TO 559' MD. S/O WT - 59K.
MONITOR DISP VIA TT.
0.0 559.0
11/10/2022
16:00
11/10/2022
20:00
4.00 INTRM1, DRILLOUT PULD P SINGLE IN THE HOLE ON 4" DP F/
559' MD T/ TOP OF UPPER STAGE
COLLAR @ 2,541' MD. UP WT - 77K,
S/O WT - 80K. MONITOR DISP VIA TT.
559.0 2,541.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 57/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/10/2022
20:00
11/10/2022
21:15
1.25 INTRM1, DRILLOUT DRLG P WASH DN F/ 2,541' MD T/ TOP OF
STAGE TOOL AT 2,553' MD. SET DN
5K. DRILL UPER STAGE TOOL F/
2,553' MD T/ 2,556 W/ 50 RPM, 1K TQ,
245 GPM, 430 PSI, 38% F/O, WOB - 3-
10K
2,541.0 2,556.0
11/10/2022
21:15
11/10/2022
21:45
0.50 INTRM1, DRILLOUT PRTS P PRESSURE TEST CSG @ 2,556' MD
TO 600 PSI FOR 10 MIN (GOOD) 11
STKS TO PRESSURE UP 1 BBL BLED
BACK.
2,556.0 2,556.0
11/10/2022
21:45
11/11/2022
00:00
2.25 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" FROM PIPESHED
F/ 2,556' MD T/ 3,548' MD. UP WT -
89K, S/O WT - 86K. MONITOR DISP
VIA TT.
2,556.0 3,548.0
11/11/2022
00:00
11/11/2022
01:00
1.00 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" FROM PIPESHED
F/ 3,548' MD T/ 4,527' MD. UP WT -
93K, S/O WT - 90K. MONITOR DISP
VIA TT.
3,548.0 4,527.0
11/11/2022
01:00
11/11/2022
01:45
0.75 INTRM1, DRILLOUT DRLG P WASH AND REAM F/ 4,527' MD T/
4,555' MD @ 250 GPM, 680 PSI, 50
RPM, 2-3K TQ, 36% F/O. ROT WT -
100K. OBSERVE 4K HOOKLOAD @
4,540' MD. P/U AND OBSERVE
OBSTRUCTION GONE. CONT TO
WASH IN THE HOLE AND OBSERVE
10K HOOKLOAD @ 4548' MD AND
SLOWLY DRILL OFF TO 0.
4,527.0 4,555.0
11/11/2022
01:45
11/11/2022
02:00
0.25 INTRM1, DRILLOUT PRTS P TEST CSG @ 4,555' MD TO 600 PSI
FOR 10 MIN.(GOOD). 7 STKS TO
PRESSURE UP, 1 BBL BLED BACK.
B/D TD AND KILL LINE.
4,555.0 4,555.0
11/11/2022
02:00
11/11/2022
03:30
1.50 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" DP FROM THE
PIPESHED F/ 4555' MD T/ 5,768' MD.
MONITOR DISP VIA TT.
4,555.0 5,768.0
11/11/2022
03:30
11/11/2022
05:30
2.00 INTRM1, DRILLOUT TRIP P CONT TO RIH W/ 4" DP FROM THE
DERRICK F/ 5,768' MD T/ 2 STANDS
ABOVE THE BAFFLE COLLAR @
9,442' MD. MONITOR DISP VIA TT.
5,768.0 9,442.0
11/11/2022
05:30
11/11/2022
06:45
1.25 INTRM1, DRILLOUT CIRC P RECIP PIPE F/ 9,442' MD T/ 9,367' MD
W/ 300 GPM, 1650 PSI, 38% F/O, 40
RPM, 6K TQ. UP WT - 161K, S/O WT -
115K, ROT WT - 140K. TREATING
MUD AS NEEDED PER MUD MAN.
9,442.0 9,442.0
11/11/2022
06:45
11/11/2022
07:45
1.00 INTRM1, DRILLOUT TRIP P PUMP SLUG. B/D TD. POOH ON
ELEVATORS F/ 9,442 MD T/ 9,161' MD.
MONITOR DISP VIA TT. UP WT -
178K.
9,442.0 9,161.0
11/11/2022
07:45
11/11/2022
08:15
0.50 INTRM1, DRILLOUT TRIP P RIH ON ELEVATORS F/ 9,161 T/ 9,443'
MD. MONITOR DISP VIA TT. S/O WT -
150K.
9,161.0 9,443.0
11/11/2022
08:15
11/11/2022
09:30
1.25 INTRM1, DRILLOUT WASH P KELLY UP AND WASH DN F/ 9,443' MD
T/ 9,644' MD W/ 250 GPM, 1305 PSI,
50 RPM, 6K TQ, 35% F/O, ROT WT -
148K.
9,443.0 9,644.0
11/11/2022
09:30
11/11/2022
10:15
0.75 INTRM1, DRILLOUT DRLG P CLEAN AND PLISH TOP OF BAFFLE
COLLAR F/ 9,644' MD T/ 9,648' MD W/
250 GPM, 1206 PSI, 50 RPM, 7K TGQ,
33% F/O, 8-12K WOB.
9,644.0 9,648.0
11/11/2022
10:15
11/11/2022
11:15
1.00 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 9,648' MD TO
9,632' MD CONDITION MUD TO A 11.0
PPG IN/OUT @ 250 GPM, 1222 PSI,
33% F/O, 50 RPM, 7K TQ. TOTAL
STKS PUMPED - 3418.
9,648.0 9,648.0
11/11/2022
11:15
11/11/2022
11:30
0.25 INTRM1, DRILLOUT OWFF P OWFF (STATIC) 9,648.0 9,648.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 58/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/11/2022
11:30
11/11/2022
16:45
5.25 INTRM1, DRILLOUT TRIP P POOH ON ELEVATORS F/ 9,648' MD T/
SURFACE. MONITOR DISP VIA TT.
L/D BIT SUB AND BIT.
9,648.0 0.0
11/11/2022
16:45
11/11/2022
17:30
0.75 INTRM1, DRILLOUT BHAH P CLEAN AND CLEAR RIG FLOOR.
SIMOPS - PREP FOR WIRELINE OPS.
0.0 0.0
11/11/2022
17:30
11/11/2022
18:30
1.00 INTRM1, DRILLOUT QEVL P PJSM W/ RIG CREW AND SLMB
WIRELINE UNIT. P/U AND M/U
WIRELINE TOOLS T/ 40'.
0.0 0.0
11/11/2022
18:30
11/11/2022
20:15
1.75 INTRM1, DRILLOUT QEVL T TROUBLE SHOOT INABILITY TO
PASS BY WEAR BUSHING. FOUND
LOWER SPRING CENTRALIZER WAS
M/U UPSIDE DOWN CAUSING IT TO
RESTRICT ITS COMPRESSABILITY.
0.0 0.0
11/11/2022
20:15
11/12/2022
00:00
3.75 INTRM1, DRILLOUT QEVL P RIH T/ 9,600' MD VIA WIRELINE. CBL
FROM SURFACE SHOE (2,376' MD)
TO 9,600' MD.
0.0 0.0
11/12/2022
00:00
11/12/2022
05:00
5.00 INTRM1, DRILLOUT QEVL P POOH F/ 9,600' MD AND LOG TO
SURFACE.
0.0 0.0
11/12/2022
05:00
11/12/2022
06:00
1.00 INTRM1, DRILLOUT QEVL P L/D AND R/D SLMB ELINE. 0.0 0.0
11/12/2022
06:00
11/12/2022
21:30
15.50 INTRM1, DRILLOUT PULD P L/D 89 STDS OF 5" DP VIA
MOUSEHOLE.
0.0 0.0
11/12/2022
21:30
11/12/2022
22:45
1.25 INTRM1, DRILLOUT BHAH P MOBILIZE PRODUCTION BHA TO RIG
FLOOR. SIMOPS - CLEAN AND
CLEAR RIG FLOOR.
0.0 0.0
11/12/2022
22:45
11/13/2022
00:00
1.25 INTRM1, DRILLOUT BHAH P PJSM, P/U PRODUCTION BHA #4 AS
PER SLMB DD TO 150' MD.
0.0 150.0
11/13/2022
00:00
11/13/2022
01:30
1.50 INTRM1, DRILLOUT BHAH P PJSM, P/U PRODUCTION BHA #4 AS
PER SLMB DD FROM 150' MD TO 750'
MD. MONITOR DISP VIA TT.
150.0 750.0
11/13/2022
01:30
11/13/2022
02:30
1.00 INTRM1, DRILLOUT TRIP P RIH WITH PRODUCTION BHA #4 W/ 4"
DP FROM THE DERRICK F/ 750' MD T/
2,638' MD. MONITOR DISP VIA TT.
750.0 2,638.0
11/13/2022
02:30
11/13/2022
03:30
1.00 INTRM1, DRILLOUT DHEQ P SHALLOW HOLE TEST MWD W/ 250
GPM, 1190 PSI, 33% F/O (FAILED).
INCREASE PUMP RATE TO 305 GPM,
2005 PSI, 40% F/O. (FAILED) NO
COMMUNICATION WITH THE
SONICSCOPE AND TELESCOPE
TOOLS. DECISION MADE TO POOH
AND INSTALL BACKUP MWD AND
SONICSCOPE.
2,638.0 2,638.0
11/13/2022
03:30
11/13/2022
04:30
1.00 INTRM1, DRILLOUT TRIP T B/D TD. POOH ON ELEVATORS F/
2,638' MD T/ 197' MD. MONITOR DISP
VIA TT.
2,638.0 197.0
11/13/2022
04:30
11/13/2022
06:45
2.25 INTRM1, DRILLOUT BHAH T CONT TO POOH W/ BHA. RACK
BACK HWDP AND JAR STAND. L/D
BHA #4 AS PER SLMB DD/MWD.
MONITOR DISP VIA TT.
197.0 0.0
11/13/2022
06:45
11/13/2022
10:15
3.50 INTRM1, DRILLOUT BHAH T SLMB PREP NEW TOOLS TO BE
PICKED UP. SURFACE CHECK
MICROSCOPE AND VPWD ARE
OPERATIONAL (GOOD).
0.0 0.0
11/13/2022
10:15
11/13/2022
12:00
1.75 INTRM1, DRILLOUT BHAH T M/U BHA #5 AS PER SLMB DD/MWD
TO 459' MD. MONITOR DISP VIA TT.
S/O WT - 56K
0.0 459.0
11/13/2022
12:00
11/13/2022
12:30
0.50 INTRM1, DRILLOUT BHAH T RIH W/ BHA #5 W/ HWDP AND JAR
STAND FROM DERRICK F/ 459' MD T/
748' MD. MONITOR DISP VIA TT. S/O
WT - 63K
459.0 748.0
11/13/2022
12:30
11/13/2022
14:00
1.50 INTRM1, DRILLOUT TRIP T CONT TO RIH W/ BHA #5 ON 4" DP
FROM THE DERRICK F/ 748' MD T/
2,635' MD. MONITOR DISP VIA TT.
748.0 2,635.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 59/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/13/2022
14:00
11/13/2022
16:15
2.25 INTRM1, DRILLOUT DHEQ T SHALLOW HOLE TEST BHA W/ 250
GPM, 1590 PSI, 34% F/O (GOOD).
2,635.0 2,635.0
11/13/2022
16:15
11/13/2022
19:00
2.75 INTRM1, DRILLOUT TRIP P CONT TO RIH W/ BHA #5 F/ 2,635' MD
T/ 9,631' MD. FILLING EVERY 20
STDS AND B/D TD. MONITOR DISP
VIA TT. S/O WT - 124K
2,635.0 9,631.0
11/13/2022
19:00
11/13/2022
21:30
2.50 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 9,361' MD T/
9,267' MD AND CONDITION MUD W/
250 GPM, 2645 PSI, 35% F/O, 40 RPM,
6K TQ, ROT WT - 148K. TOTAL STKS
PUMPED - 7,312
9,631.0 9,631.0
11/13/2022
21:30
11/13/2022
23:15
1.75 INTRM1, DRILLOUT PRTS P R/U AND PT 7" 26" L-80 H563
INTERMEDIATE CSG TO 4200 PSI F/
30 CHARTED MIN (GOOD). 46 STKS
TO PRESSURE UP TO 4200, BLED
BACK 4.5 BBLS. TEST WITNESSED
BY EPA VIA TEAMS.
9,631.0 9,631.0
11/13/2022
23:15
11/14/2022
00:00
0.75 INTRM1, DRILLOUT WASH P OBTAIN SPR'S. WASH DN F/ 9,631'
MD T/ TOP OF BAFFLE COLLAR AT
9,645' MD. CONFIRM W/ 7K SET DN.
9,631.0 9,645.0
11/14/2022
00:00
11/14/2022
01:30
1.50 INTRM1, DRILLOUT DRLG P DRILL BAFFLE COLLAR F/ 9,645' MD
T/ 9,960 W/ 205 GPM, 1840 PSI, 31%
F/O, 40 RPM, 8K TQ, 10K WOB.
REAM THROUGH AREA 3X
9,645.0 9,960.0
11/14/2022
01:30
11/14/2022
01:45
0.25 INTRM1, DRILLOUT COCF P DRILL CEMENT F/ 9,960' MD T/ 9,689'
MD W/ 230 GPM, 2,145 PSI, 34% F/O,
40 RPM, 7K TQ, 4-7K WOB.
9,960.0 9,689.0
11/14/2022
01:45
11/14/2022
02:00
0.25 INTRM1, DRILLOUT DRLG P DRILL FLOAT COLLAR F/ 9,689' MD T/
9,692' MD W/ 205 GPM, 2110 PSI, 34%
F/O, 40 RPM, 7K TQ, 4-6K WOB,
REAM AREA 3X AT RATE AND 2X W/O
ROTATION.
9,689.0 9,692.0
11/14/2022
02:00
11/14/2022
03:00
1.00 INTRM1, DRILLOUT DRLG P DRILL CEMENT F/ 9,692' MD TO TOP
OF SHOE AT 9,772' MD W/ 250 GPM,
2,535 PSI, 34% F/O, 60 RPM, 7K TQ,
7K WOB.
9,692.0 9,772.0
11/14/2022
03:00
11/14/2022
03:15
0.25 INTRM1, DRILLOUT DRLG P DRILL FLOAT SHOE F/ 9,772' MD TO
9,775' MD W/ 205 GPM, 2607 PSI, 34%
F/O, 40 RPM, 7K TQ, 5-7K WOB.
9,772.0 9,775.0
11/14/2022
03:15
11/14/2022
03:45
0.50 INTRM1, DRILLOUT DRLG P DRILL RAT HOLE F/ 9,775' MD T/
9,789' MD W/ 250 GPM, 2,551 PSI,
35% F/O, 80 RPM, 6K TQ, 5K WOB.
WORK THROUGH SHOE 3X AT RATE
AND 2X W/O ROTATION.
9,775.0 9,789.0
11/14/2022
03:45
11/14/2022
04:45
1.00 INTRM1, DRILLOUT CIRC P POOH UP INTO THE SHOE AT 9,765'
MD AND ROT AND RECIP PIPE F/
9,765' MD TO 9,735' MD W/ 250 GPM,
2,465 PSI, 35% F/O, 40 RPM, 7K TQ,
ROT WT - 157K. TOTAL STKS
PUMPED - 4,600
9,789.0 9,765.0
11/14/2022
04:45
11/14/2022
05:00
0.25 INTRM1, DRILLOUT OWFF P OWFF (STATIC) SIMOPS - PJSM
WITH RIG CREW AND BEYOND REP
FOR BEARING INSTALL.
9,765.0 9,765.0
11/14/2022
05:00
11/14/2022
05:45
0.75 INTRM1, DRILLOUT MPDA P POOH T/ 9,735' MD AND STD BACK
STD. PULL TRIP NIPPLE AND
INSTALL MPD BEARING.
9,765.0 9,735.0
11/14/2022
05:45
11/14/2022
06:00
0.25 INTRM1, DRILLOUT MPDA P CIRCULATE AND WARM UP MPD
BEARING AS PER BEYOND REP.
9,735.0 9,735.0
11/14/2022
06:00
11/14/2022
06:15
0.25 INTRM1, DRILLOUT CIRC P OBTAIN SPR'S W/ BEARING
INSTALLED.
9,735.0 9,735.0
11/14/2022
06:15
11/14/2022
06:45
0.50 INTRM1, DRILLOUT MPDA P CLEAN AND CLEAR RIG FLOOR
FROM BEARING INSTALL. L/D TRIP
NIPPLE.
9,735.0 9,735.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 60/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/14/2022
06:45
11/14/2022
09:15
2.50 INTRM1, DRILLOUT PULD P P/U SLMB POWERDRIVE AND SOFT
BREAK CONNECTIONS FOR
REPAIRS. P/U AND RACK BACK 12
STDS OF 4" DP VIA MOUSEHOLE.
9,735.0 9,735.0
11/14/2022
09:15
11/14/2022
09:30
0.25 INTRM1, DRILLOUT WASH P WASH DOWN F/ 9,735' MD T/ 9,789'
MD W/ 250 GPM, 2435 PSI, 35% F/O,
40 RPM, 7K TQ. SIMOPS - SEND
DOWNLIKS.
9,735.0 9,789.0
11/14/2022
09:30
11/14/2022
11:00
1.50 INTRM1, DRILLOUT DDRL P DRILL 20' NEW FORMATION F/ 9,789'
MD T/ 9,809' MD W/ 250 GPM, 2475
PSI, 35% F/O, 100 RPM, 8K TQ, 6-11K
WOB.
9,789.0 9,809.0
11/14/2022
11:00
11/14/2022
12:00
1.00 INTRM1, DRILLOUT REAM P ROT AND RECIP PIPE F/ 9,809' MD TO
9,726' MD W/ 250 GPM, 2430 PSI, 35%
F/O, 40-80 RPM, 7K TQ, TOTAL STKS
PUMPED - 2820
9,809.0 9,726.0
11/14/2022
12:00
11/14/2022
13:30
1.50 INTRM1, DRILLOUT FIT P R/U AND FIT. 905 PSI ACHIEVED
(13.0 PPG EQUIVALENT). 11 STKS TO
PRESSURE, .8 BBLS BLED BACK.
B/D & R/D TESTING EQUIPMENT
9,726.0 9,726.0
11/14/2022
13:30
11/14/2022
14:00
0.50 INTRM1, DRILLOUT SFTY P PJSM WITH ALL HANDS ON DISP
WELL TO 10.0 PPG LSND. SIMOPS -
LOAD 48 JTS 4½ LINER INTO THE
PIPESHED.
9,726.0 9,726.0
11/14/2022
14:00
11/14/2022
16:00
2.00 INTRM1, DRILLOUT DISP P PREP PITS AND ROCKWASHER FOR
DISPLACEMENT. DISPLACE
WELLBORE TO 10.0 PPG LSND. ROT
AND RECIP PIPE F/ 9,726' MD T/
9,632' MD @ 250 GPM, 3156 PSI, 34%
F/O, 40 RPM, 7K TQ, ROT WT - 153K,
TOTAL STKS PUMPED - 4045
9,726.0 9,726.0
11/14/2022
16:00
11/14/2022
17:00
1.00 INTRM1, DRILLOUT CIRC P UPON NEW MUD TO SURFACE.
OBSERVE SCREENS BLINDING OFF.
SCREEN DOWN. AND OBTAIN SPR'S.
9,726.0 9,726.0
11/14/2022
17:00
11/14/2022
17:30
0.50 INTRM1, DRILLOUT WASH P WASH DN F/ 9,726' MD TO 9,809' MD
W/ 250 GPM, 2355 PSI, 33% F/O, 80
RPM, 5K TQ.
9,726.0 9,809.0
11/14/2022
17:30
11/15/2022
00:00
6.50 PROD1, DRILL DDRL P DRILL AHEAD F/ 9,809' MD T/ 10,050'
MD, 8,971' TVD, W/ WOB - 11-15K,
GPM - 275, PSI ON - 2528, PSI OFF -
2504, RPM - 120, TQ ON - 6K, TQ OFF
- 4K, FO - 38%, ECD - 11.35. P/U WT -
180K, S/O WT - 156K, ROT WT - 165K,
ADT - 7.24, TOTAL BIT HRS - 7.24,
OTTAL JAR HRS - 7.24, MPD
CONNECTIONS BACK PSI - 430
9,809.0 10,050.0
11/15/2022
00:00
11/15/2022
06:00
6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,050' MD T/ 10,377'
MD, W/ WOB - 11-15K, GPM - 275, PSI
ON - 2570, PSI OFF - 2550, RPM - 120,
TQ ON - 7K, TQ OFF - 5K, FO - 39%,
ECD - 11.43. P/U WT - 185K, S/O WT -
164K, ROT WT - 165K, MPD
CONNECTIONS BACK PSI - 430 ADT -
5.46, TOTAL BIT HRS - 12.70, JAR
HRS - 12.7.
10,050.0 10,377.0
11/15/2022
06:00
11/15/2022
12:00
6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,377' MD T/ 10,627'
MD, W/ WOB - 11-15K, GPM - 275, PSI
ON - 2498, PSI OFF - 2491, RPM - 130,
TQ ON - 5K, TQ OFF - 4K, FO - 36%,
ECD - 11.26. P/U WT - 185K, S/O WT -
164K, ROT WT - 165K, MPD
CONNECTIONS BACK PSI - 450 ADT -
4.88, TOTAL BIT HRS - 17.58, JAR
HRS - 17.58.
10,377.0 10,627.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 61/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/15/2022
12:00
11/15/2022
18:00
6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,627' MD T/ 10,864'
MD, W/ WOB - 11-13K, GPM - 275, PSI
ON - 2354, PSI OFF - 2348, RPM - 120,
TQ ON - 7K, TQ OFF - 5K, FO - 36%,
ECD - 11.11. P/U WT - 182K, S/O WT -
162K, ROT WT - 168K, MPD
CONNECTIONS BACK PSI - 450 ADT -
5.43, TOTAL BIT HRS - 23.01, JAR
HRS - 23.01.
10,627.0 10,864.0
11/15/2022
18:00
11/16/2022
00:00
6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,864' MD T/ 11,155'
MD, W/ WOB - 11-15K, GPM - 255, PSI
ON - 2390, PSI OFF - 2379, RPM - 120,
TQ ON - 7K, TQ OFF - 4K, FO - 36%,
ECD - 11.32. P/U WT - 188K, S/O WT -
163K, ROT WT - 173k, MPD
CONNECTIONS BACK PSI - 450 ADT -
5.11, TOTAL BIT HRS - 28.12, JAR HRS
- 28.12.
ENCOUNTER 60 BPH LOSSES AT
10,915' MD. PUMPED 2 EA 30 BBL/25
PPB PROCOR LCM PILLS AND
OBSERVE LOSS IMPROVE TO 20
BPH.
10,864.0 11,155.0
11/16/2022
00:00
11/16/2022
00:30
0.50 PROD1, TRIPCAS SRVY P COLLECT FINAL T&D VALUES.
OBTAIN FINAL SURVEY. DROP 2.4"
OD RABBIT W/ 100' TAIL.
11,155.0 11,153.0
11/16/2022
00:30
11/16/2022
06:00
5.50 PROD1, TRIPCAS BKRM P BROOH F/ 11,153' MD TO 9,730' MD
W/ 275 GPM, PSI - 2600, REDUCE RT
TO 250 PSI - , 2256% F/O, 120 RPM,
5K TQ, 160K UP WT AT RATE. IECD -
11.24, FECD - 11.22.
11,153.0 9,730.0
11/16/2022
06:00
11/16/2022
09:30
3.50 PROD1, TRIPCAS CIRC P ROT AND RECIP PIPE FROM 9,730'
MD T/ 9,638' MD W/ 250 GPM, 2110
PSI, 36% F/O, 40 RPM, 3K TQ. TOTAL
STKS PUMPED - 12,876. SIMOPS -
PREP PROCOR LCM PILL IN PITS.
9,730.0 9,730.0
11/16/2022
09:30
11/16/2022
12:00
2.50 PROD1, TRIPCAS SMPD T STRIP IN THE HOLE F/ 9,730' MD T/
10,913' MD. HOLDING 350 PSI WHILE
RIH, AND 450 STATIC IN SLIPS.
WASH AND REAM TIGHT SPOTS W/
250 GPM, 40-100 RPM, 1-4K TQ @
9,879, 10,002, 10,913' MD.
9,730.0 10,913.0
11/16/2022
12:00
11/16/2022
14:00
2.00 PROD1, TRIPCAS WASH T WASH TO BTM F/ 10,913' MD TO
11,155' MD W/ 200 GPM, 1675 PSI, 40
RPM, 4K TQ, 32% F/O, OBSERVE
SLIGHT LOSSES @ INITIAL START UP
RATE OF 250, DECREASE FLO RATE
TO 200
10,913.0 11,155.0
11/16/2022
14:00
11/16/2022
14:45
0.75 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE F/ 11,155' MD
TO 11,091' MD & CBU @ 200 GPM,
1676 PSI, 32% F/O, TOTAL STKS
PUMPED - 2612
11,155.0 11,155.0
11/16/2022
14:45
11/16/2022
15:45
1.00 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE F/ 11,155' MD
TO 11,091' MD & PUMP 55 BBLS OF
PROCOR LCM PILL AT 200 GPM, 1677
PSI, 32% F/O, 40 RPM, 4K TQ. UP WT
- 198K, S/O WT - 158K, ROT WT - 178K
11,155.0 11,155.0
11/16/2022
15:45
11/16/2022
16:00
0.25 PROD1, TRIPCAS CIRC T B/D TD. 11,155.0 11,155.0
11/16/2022
16:00
11/16/2022
18:45
2.75 PROD1, TRIPCAS SMPD T STRIP OOH F/ 11,155' MD TO 9,726'
MD. HOLDING 700-600 PSI VIA MPD.
MONITOR DISP VIA PIT 5. UP WT -
189K.
11,155.0 9,726.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 62/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/16/2022
18:45
11/16/2022
19:30
0.75 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE FROM 9,726'
MD T/ 9,690' MD W/ 275 GPM, 2520
PSI, 36% F/O, 30 RPM, 3K TQ. ECD -
11.45. TOTAL STKS PUMPED - 2500.
SIMOPS - PJSM ON DISPLACEMENT
9,726.0 9,726.0
11/16/2022
19:30
11/16/2022
20:45
1.25 PROD1, TRIPCAS DISP P ROT AND RECIP PIPE FROM 9,726'
MD T/ 9,690' MD DISP 10.0 PPG LSND
TO 10.0 PPG LSND W/ 275 GPM, 2520
PSI, 36% F/O, 30 RPM, 3K TQ, 11.45
ECD, ROT WT - 153K. OBSERVE 64
TOTAL BBL LOSS DURING
DISPLACEMENT. TOTAL STKS
PUMPED - 4400. OBSERVING 10.2
PPG MUD TO SURFACE AND
SHUTTING DOWN.
9,726.0 9,726.0
11/16/2022
20:45
11/16/2022
21:30
0.75 PROD1, TRIPCAS OWFF P SHUT WELL IN VIA MPD. OBSERVE
PSI STABILIZE AT 200. OPEN WELL
AND SHUT IN AFTER 30 SEC AND
OBSERVE PSI STABILIZE AT 190.
REPEAT TIL OBSERVE PSI STABILIZE
TO 160. DECISION MADE TO PUMP
AT 2 BPM AND ATTEMPT TO GET 11.0
TO SURFACE WITH MINIMAL
LOSSES.
9,726.0 9,726.0
11/16/2022
21:30
11/16/2022
22:00
0.50 PROD1, TRIPCAS CIRC P ROT AND RECIP PIPE F/ 9,726' MD TO
9,690' MD AND PUMP AT 2 BPM, 760
PSI, 60 RPM, 3K TQ. OBSERVE 11.0
TO SURFACE AT 519 STKS PUMPED.
9,726.0 9,726.0
11/16/2022
22:00
11/16/2022
23:15
1.25 PROD1, TRIPCAS OWFF P OWFF. CONFIRM BALLOONING.
OBSERVE F/O DEMINISH FROM 8%
F/O TO 2 IN 45 MIN. OBSERVE F/O
ON MPD O. OBSERVE F/O AT RCD
HEAD DEMINISH FROM 5 BPH TO 2.6
IN 30 MIN.
9,726.0 9,726.0
11/16/2022
23:15
11/17/2022
00:00
0.75 PROD1, TRIPCAS SMPD P STRIP OOH F/ 9,726' MD T/ 8,785' MD
MPD HOLDING 220 OUT OF SLIPS
AND 100 WHILE IN SLIPS. P/U WT -
173K. MONITOR DISP VIA PIT 1.
9,726.0 8,785.0
11/17/2022
00:00
11/17/2022
06:15
6.25 PROD1, TRIPCAS SMPD P CONT TO STRIP OOH F/ 8,785' MD T/
843 MD. MONITOR DISP VIA PIT #1.
FOLLOWING MPD STRIPPING
SCHEDULE. UP WT - 62K
8,785.0 843.0
11/17/2022
06:15
11/17/2022
08:00
1.75 PROD1, TRIPCAS OWFF P OWFF - SIMOPS - PREP TOOLS/RIG
FLOOR FOR BEARING REMOVAL
AND TRIP NIPPLE INSTALL.
843.0 843.0
11/17/2022
08:00
11/17/2022
09:15
1.25 PROD1, TRIPCAS MPDA P PULL MPD BEARING AND INSTALL
TRIP NIPPLE.
843.0 843.0
11/17/2022
09:15
11/17/2022
10:00
0.75 PROD1, TRIPCAS TRIP P POOH ON ELEVATORS F/ 843' MD T/
197' MD. MONITOR DISP VIA TT. UP
WT - 50K
843.0 197.0
11/17/2022
10:00
11/17/2022
12:30
2.50 PROD1, TRIPCAS BHAH P L/D BHA #5 AS PER SLMB DD/MWD F/
197' MD. MONITOR DISP VIA TT.
197.0 0.0
11/17/2022
12:30
11/17/2022
13:30
1.00 PROD1, TRIPCAS BHAH P CLEAN AND CLEAR RIG FLOOR OF
BHA #6.
0.0 0.0
11/17/2022
13:30
11/17/2022
14:15
0.75 COMPZN, CASING RURD P P/U BAKER CEMENT SWIVEL AND
INSTALL XT-39 XO'S. L/D SAME.
0.0 0.0
11/17/2022
14:15
11/17/2022
14:30
0.25 COMPZN, CASING BOPE P DRAIN STACK. P/U 4" STAND AND
FUNCTION ANNULAR, UPPER AND
LOWER VBR'S PER WEEKLY
FUNCTION TEST.
0.0 0.0
11/17/2022
14:30
11/17/2022
15:00
0.50 COMPZN, CEMENT RURD P P/U AND R/U DOYON CSG 4½
HANDLING EQUIPMENT. CONFIRM
XO MADE UP TO SAFETY VALVE.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 63/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/17/2022
15:00
11/17/2022
15:30
0.50 COMPZN, CEMENT SFTY P PJSM W/ ALL HANDS ON RUNNING
4½ 12.6# L-80 HYD563 LOWER
COMPLETION.
0.0 0.0
11/17/2022
15:30
11/17/2022
18:30
3.00 COMPZN, CEMENT PUTB P P/U 4½ 12.6# L-80 HYD563 LOWER
COMPLETION SHOE TRAC TO 130'
MD. CHECK FLOATS (GOOD).
CONTINUE TO RIH AS PER DETAIL
TO 1,540' MD. S/O WT - 56K.
MONITOR DISP VIA #1.
0.0 1,540.0
11/17/2022
18:30
11/17/2022
19:30
1.00 COMPZN, CEMENT PUTB P C/O HANDLING EQUIPMENT TO 4".
P/U AND M/U ZXP LINER HANGER
ASSEMBLY PER BAKER REP. FILL
TIE BACK W/ PAL MIX AND RIH T/
1,568' MD.
1,540.0 1,568.0
11/17/2022
19:30
11/17/2022
20:00
0.50 COMPZN, CEMENT CIRC P KELLY UP TO STD #1, RIH T/ 1,673'
MD AND CIRC LINER VOLUME W/ 3
BPM, 214 PSI, 27% F/O, P/U WT - 57K,
S/O WT - 61K, W/O PUMPS ROT W/ 10
RPM, .5K TQ, ROT WT - 58K. TOTAL
STKS PUMPED - 359
1,568.0 1,673.0
11/17/2022
20:00
11/18/2022
00:00
4.00 COMPZN, CEMENT RUNL P RIH OUT OF THE DERRICK W/ 4" DP
F/ 1,673' MD T/ 5,920' MD. FILLING
EACH STD ON THE FLY AND
TOPPING OFF EVERY 5 STANDS VIA
FILL UP HOSE. MONITOR DISP VIA
PIT #1. S/O WT - 103K, P/U WT - 107K
1,673.0 5,920.0
11/18/2022
00:00
11/18/2022
03:45
3.75 COMPZN, CEMENT RUNL P RIH OUT OF THE DERRICK W/ 4" DP
F/ 5,920' MD T/ 9,707' MD. FILLING
EACH STD ON THE FLY AND
TOPPING OFF EVERY 5 STANDS VIA
FILL UP HOSE. MONITOR DISP VIA
PIT #1. UP WT - 162K, S/O WT - 133K.
5,980.0 9,707.0
11/18/2022
03:45
11/18/2022
04:00
0.25 COMPZN, CEMENT OWFF P OWFF (STATIC) - SIMOPS - PJSM ON
PULLING TRIP NIPPLE AND INSTALL
MPD BEARING.
9,707.0 9,707.0
11/18/2022
04:00
11/18/2022
05:00
1.00 COMPZN, CEMENT MPDA P PULL TRIP NIPPLE AND INSTALL MPD
BEARING. AND RIH F/ 9707' MD TO
9,770' MD.
9,707.0 9,770.0
11/18/2022
05:00
11/18/2022
05:30
0.50 COMPZN, CEMENT CLEN P PREP PITS FOR DISPLACEMENT. 9,770.0 9,770.0
11/18/2022
05:30
11/18/2022
08:15
2.75 COMPZN, CEMENT DISP P RECIP PIPE F/ 9,772' MD TO 9,707'
MD. DISP WELL F/ 11.0 LSND TO 10.0
PPG FWP FOLLOWING MPD
ROLLOVER MODEL. TOTAL STKS
PUMPED - 3752.
9,770.0 9,770.0
11/18/2022
08:15
11/18/2022
08:30
0.25 COMPZN, CEMENT RUNL P OBTAIN TORQ & DRAG W/ 169 GPM,
830 PSI, 31% F/O, P/U WT - 160K, S/O
WT - 136K, ROT WT - 147K, 4K TQ @
10 RPM AND 20 RPM,
9,770.0 9,770.0
11/18/2022
08:30
11/18/2022
10:30
2.00 COMPZN, CEMENT RUNL P CONT TO STRIP IN THE HOLE F/
9,770' MD T/ 11,129' MD. MPD
HOLDING 250 DYNAMIC AND 450
STATIC. SO WT - 143K
9,770.0 11,129.0
11/18/2022
10:30
11/18/2022
11:30
1.00 COMPZN, CEMENT RUNL P P/U WORKING SINGLE AND BAKER
CEMENT SWIVEL. STRIP IN THE
HOLE F/ 11,129' MD TO 11,147' MD.
TAG FILL.
11,129.0 11,147.0
11/18/2022
11:30
11/18/2022
11:45
0.25 COMPZN, CEMENT WASH P WASH DN F/ 11,147' MD TO 11,155'
MD W/ 85 GPM, 880 PSI, 25% F/O, 10
RPM, 4K TQ. SPACE OUT TO 11,150'
MD.
11,147.0 11,150.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 64/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/18/2022
11:45
11/18/2022
16:15
4.50 COMPZN, CEMENT CIRC P CIRC AND CONDTION MUD. ROT AND
RECIP PIPE F/ 11,150' MD T/ 11,138'
MD. STAGE UP TO 4 BPM. ICP - 895,
24% F/O, 10 RPM, 3K TQ, @ 4 BPM,
922 PSI, 30% F/O, 10 RPM, 3K TQ,
OBSERVE LOSSES @ 4BPM. TOTAL
STKS PUMPED - 8922. UP WT - 186K,
S/O WT - 143K.
11,150.0 11,150.0
11/18/2022
16:15
11/18/2022
17:30
1.25 COMPZN, CEMENT RURD P SHUT DN PUMP. LINE UP MPD ON
BACK SIDE AND HOLD 450 PSI. B/D
TD. R/U CEMENT HOSE TO BAKER
CEMENT SWIVEL.
11,150.0 11,150.0
11/18/2022
17:30
11/18/2022
18:45
1.25 COMPZN, CEMENT CIRC P ESTABLISH RATES THROUGH
CEMENT LINE. ICP @ 2BPM - 693 PSI
W/ 23 % F/O. 2½ BPM - 767 PSI, 28%
F/O, 3 BPM - 835 PSI, 29% F/O, 3½
BPM - 930 PSI, 30% F/O. ROT WHILE
ESTABLISHING RATES W/ 10 RPM
AND 3K TQ, ROT WT - 163K.
11,150.0 11,150.0
11/18/2022
18:45
11/18/2022
21:45
3.00 COMPZN, CEMENT CMNT P PJSM, CEMENTERS PUMP 5 BBLS
H20, TEST CEMENT LINES T/ 600
LOW AND 4,500 HIGH (GOOD). PUMP
20.1 BBLS 12# MUD PUSH II @ 2.4
BPM, ICP= 881 PSI, FCP= 591 PSI,
37% F/O. FOLLOWED BY 43.7 BBLS
OF 15.6# TAIL CEMENT @ 3 BPM,
ICP= 670, FCP= 127 PSI, 37% F/O.
FLUSH 10 BBLS BRINE TO
CEMENTERS W/ RIG PUMP. DROP
DART AND CHASE WITH 120 BBLS
OF BRINE (20 BBLS CI BRINE INSIDE
LINER) @ 3BPM ICP= 25 PSI, FCP=
986 PSI. LATCHED UP TO WIPER
PLUG @ 780 STKS, BUMPED PLUG
@ 986 STKS, PRESSURE UP TO 1,500
PSI AND HOLD F/ 5 MIN. CIP @ 21:20
HRS. CHECK FLOATS (GOOD). 12
BBLS LOST DURING INITIAL SWAP
TO RIG PUMPS VIA MPD BACK
PRESSURE - 26 BBLS TOTAL LOST
DURING TASK.
11,150.0 11,150.0
11/18/2022
21:45
11/18/2022
22:00
0.25 COMPZN, CEMENT PACK P SET LINER HANGER AND RELEASE
FROM LINER AS PER BAKER REP
WITH NO ISSUES.
11,150.0 9,582.0
11/18/2022
22:00
11/18/2022
23:30
1.50 COMPZN, CEMENT WAIT P WAIT ON TOWN EVALUATION OF
CEMENT LIFT PRESSURE/LOSSES.
SIMOPS - OWFF, PREP PITS FOR
FLUID DISPLACEMENT.
9,582.0 9,582.0
11/18/2022
23:30
11/18/2022
23:45
0.25 COMPZN, CEMENT PACK P SET ZXHD PAKER PER BAKER REP
WITH NO ISSUES..
9,582.0 9,582.0
11/18/2022
23:45
11/19/2022
00:00
0.25 COMPZN, CEMENT WASH P POOH F/ 9,582' MD T/ 9525' MD AND
WASH SEAL BORE EXTENSION W/ 3
BPM, 733 PSI, 33% F/O. UP WT -
156K
9,582.0 9,525.0
11/19/2022
00:00
11/19/2022
00:45
0.75 COMPZN, CEMENT DISP P AT 9,525' MD DISPLACE WELL TO 11.0
PPG BRINE AND REMOVE RESIDUAL
CEMENT OFF LINER TOP AT 10 BPM,
2148 PSI, 44% F/O, TOTAL STKS
PUMPED - 508 BBLS. ( OBSERVE
CONTAMINATED CEMENT WITH
CEMNET TO SURFACE AT 200BBLS.
GOOD BRINE TO SURFACE AT 225
BBLS INTO DISPLACEMENT.. 25
TOTAL BBLS.)
9,525.0 9,525.0
11/19/2022
00:45
11/19/2022
01:00
0.25 COMPZN, CEMENT OWFF P OWFF (STATIC) 9,525.0 9,525.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 65/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/19/2022
01:00
11/19/2022
02:00
1.00 COMPZN, CEMENT RURD P L/D 2EA SINGLES AND BAKER
CEMENT SWIVEL. B/D TD.
9,525.0 9,525.0
11/19/2022
02:00
11/19/2022
03:30
1.50 COMPZN, CEMENT MPDA P PULL MPD BEARING AND INSTALL
TRIP NIPPLE. SIMOPS - CLEAN MUD
MANIFOLD CEMENT VALVES - CLEAR
AND CLEAN RIG FLOOR.
9,525.0 9,525.0
11/19/2022
03:30
11/19/2022
04:45
1.25 COMPZN, CEMENT PULD P POOH ON ELEVATORS LAYING
DOWN 4" DP 1X1 F/ 9,525' MD T/
8,601' MD. MONITOR DISP VIA TT.
UP WT - 140K.
9,525.0 8,601.0
11/19/2022
04:45
11/19/2022
09:00
4.25 COMPZN, CEMENT TRIP P CONT TO POOH ON ELEVATORS F/
8,601' MD TO SURFACE RACKING
BACK IN THE DERRICK. MONITOR
DISP VIA TT.
8,601.0 0.0
11/19/2022
09:00
11/19/2022
09:15
0.25 COMPZN, CEMENT BHAH P L/D BAKER BHA RUNNING TOOLS. 0.0 0.0
11/19/2022
09:15
11/19/2022
10:30
1.25 COMPZN, CEMENT PULD P L/D 5 STDS OF 4" HWDP AND 1 JAR
STAND.
0.0 0.0
11/19/2022
10:30
11/19/2022
11:45
1.25 COMPZN, CEMENT BHAH P CLEAN AND CLEAR RIG FLOOR.
SIMOPS - P/U BAKER SCRAPER RUN
BHA VIA BEAVERSLIDE.
0.0 0.0
11/19/2022
11:45
11/19/2022
21:15
9.50 COMPZN, WELLPR QEVL P R/U AND RUN SLMB WIRELINE.
COMPLETE GUAGE RING RUN &
USIT/CBL/GR/CCL LOGS TO TOP OF
THE LANDING COLLAR @ 11,019' MD.
MONITOR DISP VIA TT.
0.0 0.0
11/19/2022
21:15
11/19/2022
22:45
1.50 COMPZN, WELLPR PRTS P P/T 4½ LINER TO 4200 PSI (GOOD).
4.5 BBLS TO PRESSURE UP AND 4.5
BBLS BLED BACK. TEST
WITNESSED BY EPA VIA TEAMS.
0.0 0.0
11/19/2022
22:45
11/19/2022
23:45
1.00 COMPZN, WELLPR BHAH P M/U BAKER SCRAPER BHA TO 27'
MD. MONITOR DIPS VIA TT.
0.0 27.0
11/19/2022
23:45
11/20/2022
00:00
0.25 COMPZN, WELLPR TRIP P TIH F/ 27' MD T/ 594' MD. S/O WT -
58K. MONITOR DISP VIA TT.
27.0 594.0
11/20/2022
00:00
11/20/2022
04:30
4.50 COMPZN, WELLPR TRIP P CONT TO TIH F/ 594' MD TO TOP OF
LINER @ 9,478' MD.
594.0 9,478.0
11/20/2022
04:30
11/20/2022
05:00
0.50 COMPZN, WELLPR WASH P POLISH SBR AS PER BAKER &
SCRAPE AREA FOR TNT PKR F/
9,478' MD T/ 9,594' MD W/ 127 GPM,
271 PSI, 25% F/O, 20 RPM, 2 TQ, UP
WT - 160K, S/O WT - 150K, ROT WT -
155K. TAG W/ NO GO @ 9,594' MD W/
7K DN WT.
9,478.0 9,594.0
11/20/2022
05:00
11/20/2022
05:30
0.50 COMPZN, WELLPR WASH P WASH F/ 9,582' MD TO 9,507' MD W/ 3
BPM, 127 GPM, 259 PSI, 22% F/O, 20
RPM, 2K TQ.
9,594.0 9,582.0
11/20/2022
05:30
11/20/2022
06:30
1.00 COMPZN, WELLPR DISP P DISPLACE WELL TO 11.0 CI BRINE @
8 BPM, 338 GPM, 1425 PSI, 39% F/O.
RECIP PIPE F/ 9,582' MD TO 9,507'
MD. TOTAL STKS PUMPED - 3793
(381 BBLS)
9,582.0 9,582.0
11/20/2022
06:30
11/20/2022
06:45
0.25 COMPZN, WELLPR OWFF P OWFF (STATIC) 9,582.0 9,582.0
11/20/2022
06:45
11/20/2022
21:00
14.25 COMPZN, WELLPR PULD P POOH F/ 9,582' MD TO 8,951' MD. L/D
4" DP 1X1. MONITOR DISP VIA TT.
OBSERVE PIPE PULLING WET.
PUMP 20 BBL SLUG. CONT TO POOH
L/D 4" DP 1X1 TO 27' MD. SIMOPS -
CLEAN PITS.
9,582.0 27.0
11/20/2022
21:00
11/20/2022
21:45
0.75 COMPZN, WELLPR BHAH P L/D BAKER SCRAPER BHA AS PER
BAKER REP.
27.0 0.0
11/20/2022
21:45
11/20/2022
22:30
0.75 COMPZN, WELLPR PULD P P/U 5" TEST JT. PULL WEAR
BUSHING AS PER FMC.
0.0 0.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 66/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/20/2022
22:30
11/20/2022
23:30
1.00 COMPZN, WELLPR WWWH P M/U STACK FLUSHING TOOL AND
WASH WELLHEAD/STACK W/ 675
GPM, 88 PSI, 55% F/O, 20 RPM, .3K
TQ.
0.0 0.0
11/20/2022
23:30
11/21/2022
00:00
0.50 COMPZN, RPCOMP RURD P R/U TO RUN 4½ 12.6# L-80 & L-83
HYD563 TBG.
0.0 0.0
11/21/2022
00:00
11/21/2022
01:30
1.50 COMPZN, RPCOMP RURD P R/U TO RUN 4½ 12.6# L-80 & L-83
HYD563 TBG.
0.0 0.0
11/21/2022
01:30
11/21/2022
01:45
0.25 COMPZN, RPCOMP SFTY P SAFETY MEETING HELD WITH ALL
HANDS INVOLVED.
0.0 0.0
11/21/2022
01:45
11/21/2022
02:30
0.75 COMPZN, RPCOMP RCST P P/U AND MAKE UP INDEXING MULE
SHOE, 3.75 DB NIPPLE, TNT PKR,
2EA JTS, SL QUARTS DHG AND
MANDREL TO 157' MD. MONITOR
DISP VIA TT.
0.0 157.0
11/21/2022
02:30
11/21/2022
03:30
1.00 COMPZN, RPCOMP RCST P M/U SINGLE WAY PLUG TO TEC-
WIRE AS PER SLMB REPS.
157.0 157.0
11/21/2022
03:30
11/21/2022
06:00
2.50 COMPZN, RPCOMP RCST P CONT TO RIH W/ R/U TO RUN 4½
12.6# L-80 & L-83 HYD563 TBG AS
PER DETAIL F/ 157' MD T/ 1,980' MD.
MONITOR DISP VIA TT. TQ ALL
CONNECTIONS TO 3800 FT/LBS.
157.0 2,012.0
11/21/2022
06:00
11/21/2022
11:45
5.75 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-80, HYD 563 TBG
F/ 2012' MD T/ 6,444' MD.S/O WT=
68K. MONITORING
DISPLACEMENT VIA TRIP TANK,
CALLING OUT EVERY 10 JTS. M/U TQ
F/ HYD 563= 3,800
FT/LBS
2,012.0 6,444.0
11/21/2022
11:45
11/21/2022
12:00
0.25 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-83, HYD 563 TBG
F/ 6,444' MD T/ 6732' MD.S/O WT=
110K. MONITORING
DISPLACEMENT VIA TRIP TANK,
CALLING OUT EVERY 10 JTS. M/U TQ
F/ HYD 563= 3,800
FT/LBS
6,444.0 6,732.0
11/21/2022
12:00
11/21/2022
13:15
1.25 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-83, HYD 563 TBG
F/ 6,732' MD T/ 7,747' MD.S/O WT=
113K. MONITORING
DISPLACEMENT VIA TRIP TANK,
CALLING OUT EVERY 10 JTS. M/U TQ
F/ HYD 563= 3,800
FT/LBS
6,732.0 7,747.0
11/21/2022
13:15
11/21/2022
16:00
2.75 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-80, HYD 563 TBG
F/ 7,747' MD T/ 9,530' MD.S/O WT=
125K. MONITORING
DISPLACEMENT VIA TRIP TANK,
CALLING OUT EVERY 10 JTS. M/U TQ
F/ HYD 563= 3,800
FT/LBS
7,747.0 9,530.0
11/21/2022
16:00
11/21/2022
16:30
0.50 COMPZN, RPCOMP RCST P S/O F/ 9530' MD T/ 9594' SET 5K
SHEAR OUT. S/O T/ 9595' NO GO.
VERIFY DEPTH PREP FOR
SPACE OUT
9,530.0 9,594.0
11/21/2022
16:30
11/21/2022
17:00
0.50 COMPZN, RPCOMP RCST P P/U SPACE OUT PUPS AND SPACE
OUT AS PER BAKER AND
HALIBURTON REPS. VERIFY
DEPTHS AND PIPE COUNT. P/U FMC
HANGER AND INSTALL AS PER FMC
REP. 237 CROSS
COUPLINGS CLAMPS.
9,594.0 9,594.0
11/21/2022
17:00
11/21/2022
18:45
1.75 COMPZN, RPCOMP RCST P SLB TERMINATE CONTROL WIRE.
TEST HANGER VOID AS PER FMC
REP T/ 5000 PSI
CHARTED
9,594.0 9,594.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 67/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/21/2022
18:45
11/21/2022
19:00
0.25 COMPZN, RPCOMP THGR P RIH W/ HANGER F/ 9,530' MD T/ 9,595'
MD, S/O WT= 127K. LAND HANGER
ON DEPTH
9,594.0 9,594.0
11/21/2022
19:00
11/21/2022
19:15
0.25 COMPZN, RPCOMP THGR P RUN IN LOCK DOWN SCREWS PER
FMC REP
9,594.0 9,594.0
11/21/2022
19:15
11/21/2022
19:45
0.50 COMPZN, RPCOMP THGR P R/U TO TEST HANGER SEALS 9,594.0 9,594.0
11/21/2022
19:45
11/21/2022
20:00
0.25 COMPZN, RPCOMP THGR P TEST HANGER SEALS T/ 250 PSI
LOW F/ 5 MIN, 2,500 HIGH F/ 10 MIN.
(TEST GOOD)
9,594.0 9,594.0
11/21/2022
20:00
11/21/2022
22:00
2.00 COMPZN, RPCOMP THGR P DROP BALL AND ROD. M/U X/O AND
HEAD PIN ON TOP OF LANDING JT.
R/U CEMENT HOSE TO HEAD PIN
9,594.0 9,594.0
11/21/2022
22:00
11/21/2022
23:30
1.50 COMPZN, RPCOMP THGR P PRESSURE UP ON TBG T/ 4,200 PSI
AND HOLD F/ 30 MIN. BLEED TBG T/
3,000 PSI.
PRESSURE UP IA T/ 4,200 PSI AND
HOLD F/ 30 MIN. DUMP TBG
PRESSURE AND SHEAR OUTTBG
AND IA BOTH BLED OFF TO ZERO
PSI. TOTAL VOL PUMPED= 5 BBLS,
VOL BLED BACK=
5 BBLS
9,594.0 9,594.0
11/21/2022
23:30
11/22/2022
00:00
0.50 COMPZN, RPCOMP RURD P R/D LANDING JOINT, SUCK STACK
OUT
9,594.0 9,594.0
11/22/2022
00:00
11/22/2022
00:30
0.50 COMPZN, RPCOMP RURD P R/D LANDING JOINT, PUMP STACK
OUT
9,594.0 9,594.0
11/22/2022
00:30
11/22/2022
01:15
0.75 COMPZN, RPCOMP RURD P INSTALL BPV PER FMC REP AND
TEST FROM BELOW TO 2,500 PSI F/
10 MIN (TEST GOOD
9,594.0 9,594.0
11/22/2022
01:15
11/22/2022
02:30
1.25 COMPZN, RPCOMP RURD P CLEAN AND CLEAR RIG FLOOR 9,594.0 9,594.0
11/22/2022
02:30
11/22/2022
03:00
0.50 COMPZN, WHDBOP RURD P PULL RISER, INSTALL RCD TEST
PLUG
9,594.0 9,594.0
11/22/2022
03:00
11/22/2022
04:30
1.50 COMPZN, WHDBOP RURD P R/D MPD SYSTEM SEND MPD
EQUIPMENT OUT OF BOP DECK.
9,594.0 9,594.0
11/22/2022
04:30
11/22/2022
06:30
2.00 COMPZN, WHDBOP NUND P N/D BOPE 9,594.0 9,594.0
11/22/2022
06:30
11/22/2022
08:00
1.50 COMPZN, WHDBOP NUND P P/U POTATO MASHER AND BREAK
ANNULAR CAP.
9,594.0 9,594.0
11/22/2022
08:00
11/22/2022
10:30
2.50 COMPZN, WHDBOP NUND P RACK BACK BOPS AND BREAK
DOWN SPACER SPOOLS. SIMOPS
LOAD FMC TREE IN PIPE
SHED AND PREP FOR INSTALL
9,594.0 9,594.0
11/22/2022
10:30
11/22/2022
12:00
1.50 COMPZN, WHDBOP WWWH P SLB AND FMC TERMINATE CONROL
LINE. SIMOPS CLEAN AND FLUSH
MUD LINES WITH
DEEP CLEAN PILL
9,594.0 9,594.0
11/22/2022
12:00
11/22/2022
14:30
2.50 COMPZN, WHDBOP WWWH P SLB AND FMC TERMINATE CONROL
LINE, INSTALL TREE ADAPTER
FLANGE
9,594.0 9,594.0
11/22/2022
14:30
11/22/2022
15:15
0.75 COMPZN, WHDBOP WWWH P R/U TEST TREE ADAPTER VOID T/
5000 PSI, CHART F/ 10 MIN.
9,594.0 9,594.0
11/22/2022
15:15
11/22/2022
17:30
2.25 COMPZN, WHDBOP WWWH P BREAK UPPER AND LWR FLANGE ON
WELL HEAD AND RE-ORIENTATE SSV
AS PER FMC
REP. SIMOPS R/D PIPE SKATE
9,594.0 9,594.0
11/22/2022
17:30
11/22/2022
18:45
1.25 COMPZN, WHDBOP WWWH P FILL WELL HEAD WITH DIESEL AND
INSTALL TREE CAP
9,594.0 9,594.0
11/22/2022
18:45
11/22/2022
19:30
0.75 COMPZN, WHDBOP WWWH P TEST TREE TO 250 PSI LOW F/ 10
MIN, 5,000 PSI HIGH F/ 10 MIN (TEST
GOOD)
9,594.0 9,594.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 68/68
CD1-33
Report Printed: 12/22/2022
Operations Summary (with Timelog Depths)
Job: DRILLING ORIGINAL
Time Log
Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB)
11/22/2022
19:30
11/22/2022
20:15
0.75 DEMOB, MOVE WWWH P REMOVE BPV PER FMC REPS 9,594.0 9,594.0
11/22/2022
20:15
11/22/2022
21:00
0.75 DEMOB, MOVE RURD P R/U FOR FREEZE PROTECT 9,594.0 9,594.0
11/22/2022
21:00
11/22/2022
22:00
1.00 DEMOB, MOVE FRZP P LRS FREEZE PROTECT W/ LVT. ICP=
550 PSI @ 2 BPM, FCP= 610 PSI @ 2
BPM.
TOTAL VOL PUMPED= 40.5 BBLS
9,594.0 9,594.0
11/22/2022
22:00
11/22/2022
22:30
0.50 DEMOB, MOVE WWWH P INSTALL BPV PER FMC REPS 9,594.0 9,594.0
11/22/2022
22:30
11/23/2022
00:00
1.50 DEMOB, MOVE WWWH P SECURE WELL HEAD AND OBTAIN
FINAL PRESSURES. OA= 0 PSI, IA= 0
PSI
RIG RELEASED @ 00:00 HRS 11/23/22
9,594.0 9,594.0
Rig: DOYON 142
RIG RELEASE DATE 11/23/2022
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
9/22/2022 00:00
Cementing End Date
9/17/2022 00:00
Wellbore Name
CD1-33
Comment
Cement Stages
Stage # <Stage Number?>
Description
Cement Plug
Objective Top Depth (ftKB)
5,944.0
Bottom Depth (ftKB)
8,000.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
109 BBLS 15.8 PPG CLASS G CEMENT PUMPED TROUGH RETAINER.
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
9/22/2022 00:00
Cementing End Date
9/17/2022 00:00
Wellbore Name
CD1-33
Comment
Cement Stages
Stage # <Stage Number?>
Description
Cement Plug
Objective Top Depth (ftKB)
5,944.0
Bottom Depth (ftKB)
7,658.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
1 BBL 15.8 PPG CLASS G CEMENT PUMPED ON TOP OF RETAINER
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Squeeze
Cementing Start Date
10/8/2022 17:00
Cementing End Date
10/7/2022 18:15
Wellbore Name
CD1-33
Comment
PT lines to 2500 psi. Pump 20 bbls of 15.8 class G cement. Chased and squeeze with 36 bbls of 9.8 brine.
Cement Stages
Stage # 1
Description
Squeeze – Behind Casing
Squeeze
Objective
Isolate Qannik formation
Top Depth (ftKB)
4,100.0
Bottom Depth (ftKB)
4,110.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
2
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
2
P Pump Final (psi)
239.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Squeeze 20 bbls of 15.8 ppg cement at 2 bpm, 60-150 psi. Observe 820 max to break over formation.
Cement Fluids & Additives
Fluid
Fluid Type
Squeeze Perforations
Fluid Description Estimated Top (ftKB)
4,046.0
Est Btm (ftKB)
4,110.0
Amount (sacks)
121
Class
G
Volume Pumped (bbl)
25.0
Yield (ft³/sack)
1.17
Mix H20 Ratio (gal/sack)
4.92
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
47.0
Thickening Time (hr)
5.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Squeeze
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
10/8/2022 17:00
Cementing End Date
10/7/2022 18:15
Wellbore Name
CD1-33
Comment
Leave 5 bbls in string while pulling out of the cement retainer.
Cement Stages
Stage # 1
Description
Plug – Plug Back /
Abandonment Plug
Objective
Isolate lower Qannik
Top Depth (ftKB)
3,988.0
Bottom Depth (ftKB)
4,223.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
Yes
Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB)
3,988.0
Tag Method
Drill Bit
Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Abandonment
Cement
Fluid Description Estimated Top (ftKB)
4,046.0
Est Btm (ftKB)
4,110.0
Amount (sacks)
121
Class
G
Volume Pumped (bbl)
25.0
Yield (ft³/sack)
1.17
Mix H20 Ratio (gal/sack)
4.92
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
47.0
Thickening Time (hr)
5.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Squeeze
Cementing Start Date
10/10/2022 18:00
Cementing End Date
10/10/2022 18:40
Wellbore Name
CD1-33
Comment
PT lines to 2500 psi. Pump 14 bbls13.5 mud push. Pump 30 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 23 bbls 9.8 brine.
Cement Stages
Stage # 1
Description
Cement Squeeze
Objective
Isolate upper Qannik
Top Depth (ftKB)
3,892.0
Bottom Depth (ftKB)
3,923.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
Yes
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
4
P Pump Final (psi)
30.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
Yes
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Squeeze Perforations
Fluid Description Estimated Top (ftKB)
3,202.0
Est Btm (ftKB)
3,988.0
Amount (sacks)
145
Class
G
Volume Pumped (bbl)
30.0
Yield (ft³/sack)
1.16
Mix H20 Ratio (gal/sack)
5.06
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
105.0
Thickening Time (hr)
7.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Squeeze
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
10/10/2022 18:00
Cementing End Date
10/10/2022 18:40
Wellbore Name
CD1-33
Comment
785' plug.
Cement Stages
Stage # 1
Description
Cement Plug
Objective
Isolate the upper Qannik
Top Depth (ftKB)
3,216.0
Bottom Depth (ftKB)
3,988.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
Yes
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
4
P Pump Final (psi)
30.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
Yes
Pipe RPM (rpm)
Tagged Depth (ftKB)
3,216.0
Tag Method
Drill Bit
Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
Cement Fluids & Additives
Fluid
Fluid Type
Abandonment
Cement
Fluid Description Estimated Top (ftKB)
3,202.0
Est Btm (ftKB)
3,988.0
Amount (sacks)
145
Class
G
Volume Pumped (bbl)
30.0
Yield (ft³/sack)
1.16
Mix H20 Ratio (gal/sack)
5.06
Free Water (%) Density (lb/gal)
15.80
Plastic Viscosity (cP)
105.0
Thickening Time (hr)
7.00
CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Squeeze
Cementing Start Date
10/13/2022 22:30
Cementing End Date
10/13/2022 23:00
Wellbore Name
CD1-33
Comment
PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine.
Cement Stages
Stage # 1
Description
Cement Squeeze
Objective
ISOLATE LOWER HALO
Top Depth (ftKB)
3,028.0
Bottom Depth (ftKB)
3,070.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
4
P Pump Final (psi)
30.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
Yes
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine.
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Squeeze
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
10/13/2022 22:30
Cementing End Date
10/13/2022 23:00
Wellbore Name
CD1-33
Comment
526' plug
Cement Stages
Stage # 1
Description
Cement Plug
Objective Top Depth (ftKB)
2,800.0
Bottom Depth (ftKB)
3,118.0
Full Return?
Yes
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
4
P Pump Final (psi)
30.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB)
2,632.0
Tag Method
Drill Bit
Depth Plug Drilled Out To (ftKB)
2,800.0
Drill Out Diameter (in)
6 1/8
Comment
PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine.
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Squeeze
Cementing Start Date
10/16/2022 16:15
Cementing End Date
10/16/2022 16:45
Wellbore Name
CD1-33
Comment
@ 30 RPM, 1K TQ,
PUMP 14BBL OF 13.5 PPG MUD PUSH, @ 4BPM, 260 PSI, 32% F/O.
PUMP 25BBL OF 15.8 PPG CEMENT @ 4 BPM, 250 PSI, 36 % F/O.
PUMP 6BBL 13.5 PPG MUD PUSH @ 4BPM 170 PSI, 29% F/O.
PUMP 7BBL 9.8 PPG BRINE @ 4 BPM, 120 PSI, 29 % F/O.
PUMP 3.5BBL OF 9.8 PPG, @ 2BPM, 110 PSI, 22% F/O.
Cement Stages
Stage # 1
Description
Cement Squeeze
Objective Top Depth (ftKB)
2,730.0
Bottom Depth (ftKB)
2,800.0
Full Return?
No
Vol Cement …Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
4
P Pump Final (psi)
30.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
Yes
Pipe RPM (rpm)
Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in)
Comment
@ 30 RPM, 1K TQ,
PUMP 14BBL OF 13.5 PPG MUD PUSH, @ 4BPM, 260 PSI, 32% F/O.
PUMP 25BBL OF 15.8 PPG CEMENT @ 4 BPM, 250 PSI, 36 % F/O.
PUMP 6BBL 13.5 PPG MUD PUSH @ 4BPM 170 PSI, 29% F/O.
PUMP 7BBL 9.8 PPG BRINE @ 4 BPM, 120 PSI, 29 % F/O.
PUMP 3.5BBL OF 9.8 PPG, @ 2BPM, 110 PSI, 22% F/O.
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Squeeze
Page 1/1
CD1-33
Report Printed: 12/22/2022
Cement
Cement Details
Description
Cement Plug
Cementing Start Date
10/22/2022 19:16
Cementing End Date
10/22/2022 20:15
Wellbore Name
CD1-33
Comment
SLB PUMPS 2 BBLS H20, TEST SURFACE LINES T/ 500/2000 PSI (TEST GOOD). SLB PUMPS
34.6 BBLS 13.5# MUD PUSH II, SHUT DOWN AND DROP WIPER BALL. SLB PUMPS 32.5 BBLS
17# CEMENT, 5.4 BBLS 13.5# MUD PUSH II, SLB DISPLACE 13 BBLS 9.8# BRINE.
ROTATE 20 RPM, 1K TQ DURING CEMENT JOB
CEMENT WET @ 1920 HRS
Cement Stages
Stage # 1
Description
Cement Plug
Objective Top Depth (ftKB)
2,060.0
Bottom Depth (ftKB)
2,488.0
Full Return?
Yes
Vol Cement …
0.0
Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m…
4
Q Pump Final (bbl/…
2
Q Pump Avg (bbl/…
412
P Pump Final (psi)
455.0
P Plug Bump (psi) Recip?
No
Stroke (ft) Rotated?
Yes
Pipe RPM (rpm)
Tagged Depth (ftKB)
2,229.0
Tag Method
Drill Bit
Depth Plug Drilled Out To (ftKB)
2,380.0
Drill Out Diameter (in)
8 3/4
Comment
SLB PUMPS 2 BBLS H20, TEST SURFACE LINES T/ 500/2000 PSI (TEST GOOD). SLB PUMPS
34.6 BBLS 13.5# MUD PUSH II, SHUT DOWN AND DROP WIPER BALL. SLB PUMPS 32.5 BBLS
17# CEMENT, 5.4 BBLS 13.5# MUD PUSH II, SLB DISPLACE 13 BBLS 9.8# BRINE.
ROTATE 20 RPM, 1K TQ DURING CEMENT JOB
Cement Fluids & Additives
Fluid
Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl)
Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi)
Additives
Additive Type Concentration Conc Unit label
Cement Plug
1
Regg, James B (OGC)
From:Brooks, Phoebe L (OGC)
Sent:Tuesday, November 22, 2022 1:59 PM
To:Rig 142
Cc:Regg, James B (OGC); Doyon 142 Company Man
Subject:RE: CD1-33Weekly bop test
Attachments:Doyon 142 10-05-22 Revised.xlsx; Doyon 142 10-11-22 Revised.xlsx; Doyon 142 10-17-22
Revised.xlsx; Doyon 142 10-26-22 Revised.xlsx; Doyon 142 11-10-22 Revised.xlsx
Based on the type of operation/timeline, attached are revised reports as follows:
Doyon 142 10 05 22 Test reflects Initial Workover for CD1 33, PTD #2002120, sundry #322 459
Doyon 142 10 11 22 & 10 17 22 Test reflects Weekly Workover for CD1 33, PTD #2002120, sundry #322 459
Doyon 142 10 26 22 Test reflects Initial Drilling for CD1 33A, PTD #2221050
Doyon 142 11 10 22 Test reflects Bi Weekly Drilling for CD1 33A, PTD #2221050
Please update your copies.
Thank you,
Phoebe
Phoebe Brooks
Research Analyst
Alaska Oil and Gas Conservation Commission
Phone: 907 793 1242
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you
are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the
mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.
From:Rig 142 <rig142@doyondrilling.com>
Sent:Friday, November 18, 2022 1:21 PM
To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Cc:Regg, James B (OGC) <jim.regg@alaska.gov>; Doyon 142 Company Man <d142cm@conocophillips.com>
Subject:RE: CD1 33Weekly bop test
10/26 report would be the initial drilling report on a bi weekly test cycle
Matthew .
From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Sent:Thursday, November 17, 2022 10:18 AM
To:Rig 142 <rig142@doyondrilling.com>
Cc:Regg, James B (OGC) <jim.regg@alaska.gov>
Subject:RE: CD1 33Weekly bop test
revised reports
10 11 22 &10 17 22
2
10/27? If Drilling kicked off on 10/27, then the 10/26 report should also be Workover on CD1 33. Please clarify.
Thank you,
Phoebe
Phoebe Brooks
Research Analyst
Alaska Oil and Gas Conservation Commission
Phone: 907 793 1242
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you
are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the
mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.
From:Rig 142 <rig142@doyondrilling.com>
Sent:Monday, November 14, 2022 1:41 PM
To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Cc:Doyon 142 Company Man <d142cm@conocophillips.com>
Subject:RE: CD1 33Weekly bop test
Negative. Kicked off drilling 10/27.
From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Sent:Monday, November 14, 2022 1:14 PM
To:Rig 142 <rig142@doyondrilling.com>
Subject:RE: CD1 33Weekly bop test
Was the window cut at the time of the 10/05 report?
Phoebe Brooks
Research Analyst
Alaska Oil and Gas Conservation Commission
Phone: 907 793 1242
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you
are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the
mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.
From:Rig 142 <rig142@doyondrilling.com>
Sent:Monday, November 14, 2022 10:59 AM
To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Cc:Regg, James B (OGC) <jim.regg@alaska.gov>
Subject:RE: CD1 33Weekly bop test
Consulted with Company Rep to correct findings. Reports 10/05, 10/11, 10/17 should have concluded Workover
Weekly. Reports 10/26, 11/10 as Drilling Bi weekly.
Report 10/17 had wrong PTD# and Sundry from original CD1 33 well. should be stated as current PTD# 2221050, Sundry
# 322594. Revised attachment sent. Apologies
3
MATTHEW SAM
Rig 142 Toolpusher
Rig142@doyondrilling.com
Doyon Rig 142 907-670-6002
Cell, 907-322-3715
From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Sent:Monday, November 14, 2022 9:43 AM
To:Rig 142 <rig142@doyondrilling.com>
Cc:Regg, James B (OGC) <jim.regg@alaska.gov>
Subject:RE: CD1 33Weekly bop test
The initial report on 10/05/22, witnessed by Austin McLeod, was revised to include Initial Drilling for CD1 33A based on
his report. The subsequent report on 10/11/22 was changed to Weekly Drilling (based on the initial drilling report on
10/5) for CD1 33A and now this 10/17/22 report includes Weekly Workover with well name CD1 33A, but PTD #2002120
which is for CD1 33 (with reports 10/26 & 11/10 as Bi Weekly Drilling for CD1 33A)?
Please clarify.
Thank you,
Phoebe
Phoebe Brooks
Research Analyst
Alaska Oil and Gas Conservation Commission
Phone: 907 793 1242
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you
are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the
mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov.
From:Rig 142 <rig142@doyondrilling.com>
Sent:Tuesday, October 18, 2022 3:19 PM
To:Regg, James B (OGC) <jim.regg@alaska.gov>; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>;
Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov>
Subject:CD1 33Weekly bop test
Weekly bop test form, test sequence, 2 test charts. Had a Failure on UPPER IBOP, changed out and re tested, FP on
blinds, bleed air, re tested
MATTHEW SAM
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft Lease No.: ADL0025559
Operator Rep: Suspend: P&A: X
Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet
Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet
Intermediate: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet
Production: O.D. Shoe@ Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4416 Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Perforation Bridge plug 2772 ft 2675 ft 15.8 ppg Drillpipe tag
Initial 15 min 30 min 45 min Result
Tubing
IA 1725 1712 1713 1710
OA 273 272 272 272
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
Attachments:
Plug back for redrill. Tagged cement at 2675 ft MD and put 11k down pressure with no movement. Pressure tested good.
Pushed test out an extra 15 minutes to ensure the rig heaters were not influencing the test pressure due to the heater next to the
chart recorder being on and having some temperature swings.
October 18, 2022
Guy Cook
Well Bore Plug & Abandonment
CRU CD1-33
ConocoPhilllips Alaska Inc.
PTD 2002120; Sundry 322-459
None
Test Data:
P
Casing Removal:
Mike Tucker
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
rev. 11-28-18 2022-1018_Plug_Verification_CRU_CD1-33_gc
9
9
9
9
9
9
9
9
9
9
9 9
99 9
99999
11k down pressure with no movement.
James B. Regg Digitally signed by James B. Regg
Date: 2023.04.06 13:29:00 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL 0025559
Operator Rep: Suspend: P&A: X
Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet
Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet
Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet
Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4416 Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Annulus Balanced 3118 ft 2800 ft 9.8 ppg Drillpipe tag
Initial 15 min 30 min 45 min Result
Tubing 0
IA 1624 1611 1596
OA 243 248 248
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
Attachments:
Adam Dorr
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
Plug back for redrill. This plug covered perfs they shot into the 9-5/8" and 16" from 3070 ft MD to 3028 ft MD. Top of cement at
2800 ft; set down 10K lbs. Pressures listed were from digital gauge also had a chart recording.
October 15, 2022
Kam StJohn
Well Bore Plug & Abandonment
CRU CD1-33
ConocoPhillips Alaska Inc.
PTD 2002120; Sundry 322-459
none
Test Data:
P
Casing Removal:
rev. 11-28-18 2022-1015_Plug_Verification_CRU_CD1-33_ksj
9
9
9
9
9
9
99
99 9 9 9
9 9 9 9
9
Top of cement at g
2800 ft; set down 10K lbs.
James B. Regg Digitally signed by James B. Regg
Date: 2023.04.06 13:10:16 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL 0025559
Operator Rep: Suspend: P&A: X
Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet
Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet
Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet
Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4400 Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Annulus Bridge plug 3982 ft 3217 ft 9.8 ppg Drillpipe tag
Initial 15 min 30 min 45 min Result
Tubing
IA 1650 1626 1606
OA 196 205 205
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
Attachments:
Tag and test of the upper Qannik sand isolatio cement plug. Top of cement tagged with drill pipe ad 10K lbs downweight - found
at 3217 ft MD. MIT pressures from a digital gauge; also used a chart recording to document - good test.
October 12, 2022
Kam StJohn
Well Bore Plug & Abandonment
CRU CD1-33
Conoco Phillips Alaska
PTD 2002120; Sundry 322-459
None
Test Data:
P
Casing Removal:
Adam Dorr
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
rev. 11-28-18 2022-1012_Plug_Verification_CRU_CD1-33_ksj
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL025559
Operator Rep: Suspend: P&A: X
Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet
Surface: 9-5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet
Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet
Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: 4.5" O.D. Tail@ 7654 Feet Tbg Cut@ 4400 Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Fullbore Bridge plug 4046 ft 3980 ft 9.8 ppg Drillpipe tag
Initial 15 min 30 min 45 min Result
Tubing 1600 1540 1530
IA
OA
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
Attachments:
Adam Dorr
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
Plug back for redrill. I witness the verifications if the plug isolating the Qannik sand. Top of cement was found to be at 3980 ft
MD where 8k lbs was applied to the plug with drillpipe and re-tagged showing the same depth. An MIT was then completed with
passing results.
October 9, 2022
Lou Laubenstein
Well Bore Plug & Abandonment
CRU CD1-33
ConocoPhillips Alaska Inc
PTD 2002120; Sundry 322-459
none
Test Data:
p
Casing Removal:
rev. 11-28-18 2022-1009_Plug_Verification_CRU_CD1-33_ll
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: n/a Rig Elevation: n/a Total Depth: 10,854 ft MD Lease No.: ADL0025559
Operator Rep: Suspend: P&A: XXX
Conductor: 16 O.D. Shoe@ 114 Feet Csg Cut@ Feet
Surface: 9 5/8 O.D. Shoe@ 2377 Feet Csg Cut@ Feet
Intermediate: 7 O.D. Shoe@ 7878 Feet Csg Cut@ Feet
Production: O.D. Shoe@ Feet Csg Cut@ Feet
Liner: O.D. Shoe@ Feet Csg Cut@ Feet
Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Fullbore Retainer 7597 ft 5934 ft 9.8 ppg Wireline tag
Initial 15 min 30 min 45 min Result
Tubing 2241 2190 2172
IA 13 11 10
OA 684 680 680
Initial 15 min 30 min 45 min Result
Tubing 533 535 530
IA 2208 2115 2072
OA 700 700 700
Remarks:
Attachments:
Brandon Boehme
P
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased
hole abandonment plug. I witnessed tag of cement in tubing with bailer on wireline. Also witnessed pressure test of Tbg then IA
each for 30 minutes.
September 25, 2022
Brian Bixby
Well Bore Plug & Pressure Test
CRU CD1-33
Conoco Phillips Alaska Inc.
PTD 200-212; Sundry 322-456
none
Test Data:
P
Casing Removal:
rev. 11-28-18 2022-0925_Plug_Verification_CRU_CD1-33_bb
Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased
witnessed tag of cement in tubing with bailer on wireline.
Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased
witnessed pressure test of Tbg then IA
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
Subm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Rig Owner: Rig No.:142 DATE: 10/11/22
Rig Rep.: Rig Email:
Operator:
Operator Rep.: Op. Rep Email:
Well Name: PTD #2002120 Sundry #322-459
Operation: Drilling: Workover: X Explor.:
Test: Initial: Weekly: X Bi-Weekly: Other:
Rams:250/4200 Annular:250/4200 Valves:250/4200 MASP:3846
MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES:
Test Result/Type Test Result Quantity Test Result
Housekeeping P Well Sign P Upper Kelly 1 P
Permit On Location P Hazard Sec.P Lower Kelly 1 P
Standing Order Posted P Misc.NA Ball Type 3 P
Test Fluid Water Inside BOP 2 P
FSV Misc 0 NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0 NA Trip Tank P P
Annular Preventer 1 13-5/8" 5M P Pit Level Indicators P P
#1 Rams 1 3.5" x 6"P Flow Indicator P P
#2 Rams 1 Blind/Shear P Meth Gas Detector P P
#3 Rams 1 3.5" x 6"P H2S Gas Detector P P
#4 Rams 0 NA MS Misc 0 NA
#5 Rams 0 NA
#6 Rams 0 NA ACCUMULATOR SYSTEM:
Choke Ln. Valves 1 3-1/8" 5M P Time/Pressure Test Result
HCR Valves 2 3-1/8" 5M P System Pressure (psi)3050 P
Kill Line Valves 3 3-1/8" 5M FP Pressure After Closure (psi)1550 P
Check Valve 0 NA 200 psi Attained (sec)9 P
BOP Misc 0 NA Full Pressure Attained (sec)70 P
Blind Switch Covers: All stations Yes
CHOKE MANIFOLD:Bottle Precharge:P
Quantity Test Result Nitgn. Bottles # & psi (Avg.): #6@2000 P
No. Valves 14 P ACC Misc 0 NA
Manual Chokes 1 P
Hydraulic Chokes 1 P Control System Response Time:Time (sec) Test Result
CH Misc 0 NA Annular Preventer 7 P
#1 Rams 7 P
Coiled Tubing Only:#2 Rams 7 P
Inside Reel valves 0 NA #3 Rams 7 P
#4 Rams 0 NA
Test Results #5 Rams 0 NA
#6 Rams 0 NA
Number of Failures:1 Test Time:4.5 HCR Choke 2 P
Repair or replacement of equipment will be made within 0 days. HCR Kill 2 P
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 10-9-22 @ 10:00
Waived By
Test Start Date/Time:10/11/2022 7:30
(date) (time)Witness
Test Finish Date/Time:10/11/2022 19:00
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Kam StJohn
Doyon
Test Annular w/ 3.5" & 4.5" Test jt's. Test Rams #1 & #3 w/ both 3.5" & 4.5" Test jts, test 2ea 4" FOSV & 1ea 4" Dart. And 1ea 5"
FOSV & Dart. All test 250psi-lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All
rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle
precharge 1000psi. Had a FP on kill line valve #3, pulled bonnet, cleaned and greased paddle and seat, re-tested good.
F. Carlo / H. Huntington
CPAI
A. Dorr / B. Marmon
CRU CD1-33
Test Pressure (psi):
d142cm@conocophillips.com
rig142@doyondrilling.com
Form 10-424 (Revised 08/2022) 2022-1011_BOP_Doyon142_CRU_CD1-33
10/11/22
CRU CD1-33 2002120
FP
rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle
FP on kill line valve #3,
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
*All BOPE reports are due to the agency within 5 days of testing*
Subm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov
Rig Owner: Rig No.:142 DATE: 10/17/22
Rig Rep.: Rig Email:
Operator:
Operator Rep.: Op. Rep Email:
Well Name: PTD #2002120 Sundry #322-459
Operation: Drilling: Workover: X Explor.:
Test: Initial: Weekly: X Bi-Weekly: Other:
Rams:250/4200 Annular:250/4200 Valves:250/4200 MASP:3846
MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES:
Test Result/Type Test Result Quantity Test Result
Housekeeping P Well Sign P Upper Kelly 1 FP
Permit On Location P Hazard Sec.P Lower Kelly 1 P
Standing Order Posted P Misc.NA Ball Type 2 P
Test Fluid Water Inside BOP 1 P
FSV Misc 0 NA
BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm
Stripper 0 NA Trip Tank P P
Annular Preventer 1 13-5/8" 5M P Pit Level Indicators P P
#1 Rams 1 3.5" x 6"P Flow Indicator P P
#2 Rams 1 Blind/Shear FP Meth Gas Detector P P
#3 Rams 1 3.5" x 6"P H2S Gas Detector P P
#4 Rams 0 NA MS Misc 0 NA
#5 Rams 0 NA
#6 Rams 0 NA ACCUMULATOR SYSTEM:
Choke Ln. Valves 1 3-1/8" 5M P Time/Pressure Test Result
HCR Valves 2 3-1/8" 5M P System Pressure (psi)3000 P
Kill Line Valves 3 3-1/8" 5M P Pressure After Closure (psi)1500 P
Check Valve 0 NA 200 psi Attained (sec)9 P
BOP Misc 0 NA Full Pressure Attained (sec)70 P
Blind Switch Covers: All stations Yes
CHOKE MANIFOLD:Bottle Precharge:P
Quantity Test Result Nitgn. Bottles # & psi (Avg.): #6@2001 P
No. Valves 14 P ACC Misc 0 NA
Manual Chokes 1 P
Hydraulic Chokes 1 P Control System Response Time:Time (sec) Test Result
CH Misc 0 NA Annular Preventer 15 P
#1 Rams 7 P
Coiled Tubing Only:#2 Rams 7 P
Inside Reel valves 0 NA #3 Rams 7 P
#4 Rams 0 NA
Test Results #5 Rams 0 NA
#6 Rams 0 NA
Number of Failures:2 Test Time:8.3 HCR Choke 2 P
Repair or replacement of equipment will be made within 0 days. HCR Kill 2 P
Remarks:
AOGCC Inspection
24 hr Notice Yes Date/Time 10-14-22 @ 10:43
Waived By
Test Start Date/Time:10/17/2022 10:45
(date) (time)Witness
Test Finish Date/Time:10/17/2022 19:00
BOPE Test Report
Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov
Kam StJohn
Doyon
Test Annular w/ 3.5" & 4" Test jt's. Test Rams #1 & #3 w/ both 3.5" & 4" Test jts, test 2ea 4" FOSV & 1ea 4" Dart. All test 250psi-
lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the
primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a FP on
top drive upper IBOP, changed, re-tested good. FP on Blinds, function air out, re-test good.
M. Sam / H. Huntington
CPAI
M. Tucker/ M. Arthur
CRU CD1-33
Test Pressure (psi):
d142cm@conocophillips.com
rig142@doyondrilling.com
Form 10-424 (Revised 08/2022) 2022-1017_BOP_Doyon142_CRU_CD1-33
10/17/22
CRU CD1-33 2002120
FP
FP
lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the
FP on primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a
top drive upper IBOP,
primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a
FP on Blinds,
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________COLVILLE RIV UNIT CD1-33
JBR 12/09/2022
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:0
3-1/2" & 4-1/2" joints. Good test
Test Results
TEST DATA
Rig Rep:Carlo/AllenOperator:ConocoPhillips Alaska, Inc.Operator Rep:Dorr/Marmon
Rig Owner/Rig No.:Doyon 142 PTD#:2002120 DATE:10/5/2022
Type Operation:WRKOV Annular:
250/4200Type Test:INIT
Valves:
250/5000
Rams:
250/5000
Test Pressures:Inspection No:bopSAM221006155942
Inspector Austin McLeod
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 5.5
MASP:
3846
Sundry No:
322-459
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 3 P
Inside BOP 1 P
FSV Misc 0 NA
14 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 13-5/8 P
#1 Rams 1 3-1/2x6 P
#2 Rams 1 Blind/Shear P
#3 Rams 1 3-1/2x6 P
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3-1/8 P
HCR Valves 2 3-1/8 P
Kill Line Valves 3 3-1/8 P
Check Valve 0 NA
BOP Misc 0 NA
System Pressure P3050
Pressure After Closure P1750
200 PSI Attained P9
Full Pressure Attained P68
Blind Switch Covers:PAll stations
Bottle precharge P
Nitgn Btls# &psi (avg)P6@1983
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
NA NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P10
#1 Rams P7
#2 Rams P7
#3 Rams P7
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
Originated: Delivered to:8-Sep-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 CD1-33 50-103-20357-00 908071484 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 26-Aug-22 0 12 CD1-35 50-103-20297-00 908071486 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 28-Aug-22 0 13 CD1-41 50-103-20328-00 908072045 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 29-Aug-22 0 14 CD2-02 50-103-20513-00 907988867 Colville River Multi Finger Caliper Field & Processed 12-Jul-22 0 15PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:CD1-33 PTD:200-212 T36990CD1-35 PTD:199-038 T36991CD1-41 PTD:200-017 T36992CD2-02 PTD:205-109 T36993Electromagnetic Pipe1CD1-3350-103-20357-00908071484Colville RiverXaminer Record (EPX-V)Field & Processed26-Aug-2201Kayla JunkeDigitally signed by Kayla Junke Date: 2022.09.09 09:43:03 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE:
P.I. Supervisor
SUBJECT:
FROM:
Petroleum Inspector
Section: 5 Township: 11N Range: 5E Meridian: Umiat
Drilling Rig: NA Rig Elevation: NA Total Depth: 10854 ft MD Lease No.: ADL0025559
Operator Rep: Suspend: NA P&A: X
Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ NA Feet
Surface: 9-5/8" O.D. Shoe@ 2377 Feet Csg Cut@ NA Feet
Intermediate: NA O.D. Shoe@ NA Feet Csg Cut@ NA Feet
Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ NA Feet
Liner: NA O.D. Shoe@ NA Feet Csg Cut@ NA Feet
Tubing: 4-1/2" O.D. Tail@ 7654 Feet Tbg Cut@ NA Feet
Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified
Open Hole Bottom 10,854 ft 7,406 ft 6.8 ppg Wireline tag
Initial 15 min 30 min 45 min Result
Tubing 2233 2126 2106
IA 274 273 271
OA 700 700 699
Initial 15 min 30 min 45 min Result
Tubing 430 432 435
IA 2241 2157 2146
OA 710 709 709
Remarks:
Attachments:
I traveled to location to witness the tag and pressure test of a cement plug that had been curing twenty-seven hours. The plug
was to abandon the Alpine interval. Cement was placed across the entire open hole section and brought up into the 4-1/2-inch
tubing. One barrel of cement was layed on top of the retainer (7,626 ft) once unstung. A 2-1/2-inch bailer assembly weighing
around 250 pounds was used. Proposed top of cement (TOC) was 7,560 ft (inclination 66 degrees). They encountered stringers
at 7,348 ft and worked down to 7,406 ft MD (hard tag) with multiple licks and set downs. This put the tag depth 3 barrels high.
Very slight remnants of cement was found in the bailer so they made a second run tagging at the same depth. No sample was
found in the second run either. A passing pressure test of the tubing (MITT) was then done. I found no reason to pressure test
the inner annulus due to no cement being place in that annulus yet with the tubing not punched but the application called for one
so it was done (MITIA). Target pressure for both tests was 2000 psi.
September 18, 2022
Austin McLeod
Well Bore Plug & Abandonment
Colville River Unit CD1-33
Conoco Phillips Alaska Inc
PTD 2002120; Sundry 322-456
none
Test Data:
P
Casing Removal:
Brandon Boehme
P
Casing/Tubing Data (depths are MD):
Plugging Data (depths are MD):
rev. 11-28-18 2022-0918_Plug_Verification_CRU_CD1-33_am
tag depth 3 barrels high.
1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Convert from INJ to PROD
2. Operator Name:4. Current Well Class:5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service 6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?Yes No
9. Property Designation (Lease Number):10. Field/Pool(s):
11.
Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD):
10854'None
Casing Collapse
Structural
Conductor
Surface
Production
Liner
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations:OIL WINJ WDSPL Suspended
16. Verbal Approval:Date:GAS WAG GSTOR SPLUG
Commission Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Date:
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Post Initial Injection MIT Req'd? Yes No
Spacing Exception Required? Yes No Subsequent Form Required:
APPROVED BY
Approved by:COMMISSIONER THE COMMISSION Date:
Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
(907) 265-6846
17. I hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Authorized Signature:
4-1/2"
Packer: Baker S-3 Packer
SSSV: None
Tubing Grade:
Travis Smith
2340'
7878'
Perforation Depth MD (ft):Perforation Depth TVD (ft):Tubing Size:
7844'
114'
2377'
7039'7"
16"
9-5/8"
76'
TVD Burst
7654'
MD
CRU CD1-33N/A
Colville River Field/ Alpine Oil Pool
10854'7059'None
PRESENT WELL CONDITION SUMMARY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0025559
7059'
200-212
P.O. Box 100360, Anchorage, Alaska 99510 50-103-20357-00-00
ConocoPhillips Alaska, Inc.
Length Size
114'
2376'
COMMISSION USE ONLY
L-80
Tubing MD (ft):
Open Hole: 7039-7059' TVD
Packer: 7597' MD and 6981' TVD
SSSV: N/A
Authorized Title: Senior Interventions and Integrity Engineer
Authorized Name: Travis Smith
Open Hole: 7878-10854' MD
9/8/2021
travis.t.smith@conocophillips.com
m
n s
66
t
D
c
s
Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval.
By Samantha Carlisle at 6:49 pm, Aug 25, 2021
321-426
Travis T. Smith Digitally signed by Travis T. Smith
Date: 2021.08.25 15:05:25 -08'00'
10-404
VTL 9/1/21
SFD 8/26/2021 DSR-8/25/21
X
JLC 9/1/2021
dts 9/1/2021
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2021.09.01 17:49:34
-08'00'
RBDMS HEW 9/2/2021
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
25 August 2021
Commissioner Jessie Chmielowski
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Commissioner Chmielowski,
Enclosed please find the 10-403 Application for Sundry Approval for ConocoPhillips
Alaska, Inc. well CRU CD1-22(PTD 200-212) to convert the injector well to
development (producer) status.
Please contact me at 670-4014 if you have any questions.
Sincerely,
Travis Smith
WNS Intervention & Integrity Engineer
ConocoPhillips Alaska, Inc.
CRU CD1-33 (PTD# 200-212)
Overview of Proposed Work
Background & Objective:
CRU CD1-33 (PTD# 200-212) is currently an injection well. To ease the drilling of disposal well WD-03
(during early 2022), the Alpine reservoir should be locally de-pressured in the vicinity of CD1. CD1-33
has been identified as the best candidate injector well for this operation.
The proposal below outlines the overview steps of this conversion.
Overview Steps:
1. Complete surface piping modifications to flow CD1-33 as a producer.
2. Pull A-1 injection valve from nipple at 1,723’ MD. As CD1-33 is further than 660’ from the
navigable water line and Alpine facilities, the well will not use a SSSV during production.
3. Put well on production service. If necessary for flow, gas lift valves will be installed for
artificial lift.
CRU CD1-33 (PTD# 200-212) is currently an injection well. To ease the drilling of disposal well WD-03
(during early 2022), the Alpine reservoir should be locally de-pressured in the vicinity of CD1. CD1-33
has been identified as the best candidate injector well for this operation.
Pull A-1 injection valve from nipple at 1 723’MD. As CD1-33 is further than 660’ from thePull A 1 injection valve from nipple at 1,723 MD. As CD1 33 is further than 660 from th
navigable water line and Alpine facilities, the well will not use a SSSV during production.
pp
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHUBBBBBBBBBBBBBBBBBBB
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"1$
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG3RROV
&ROYLOOH5LYHU)LHOG$OSLQH2LO3RRO
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
1RQH 1RQH
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH 0DWW1DJHO
&RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH'ULOOLQJ(QJLQHHU
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
7XELQJ*UDGH 7XELQJ0'IW
3DFNHU
0'DQG
79'
66691$
3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
32%R[$QFKRUDJH$.
&RQRFR3KLOOLSV$ODVND,QF
&58&'
/HQJWK 6L]H
/
79' %XUVW
0'
3HUIRUDWLRQ'HSWK0'IW
PDWWEQDJHO#FRSFRP
2SHQ+ROH
0'
2SHQ+ROH
79'
3DFNHU%DNHU63DFNHU
66691RQH
3HUIRUDWH
5HSDLU:HSDLU:HOO
([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
%237HVW0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
$EDQGRQHG
1R
1R
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
By Samantha Carlisle at 10:06 am, Aug 04, 2022
'65
6)'
;
97/
;
&%/ UHTXLUHG RQ 2$ FDVLQJ2+ FHPHQW DFURVV 4DQQLN DQG +DOR 5HYLHZ ZLWK $2*&& IRU DSSURYDO EHIRUH SURFHHGLQJ
;;
;
SVL 97/
%23 WHVW SUHVVXUH WR SVLJ
$QQXODU SUHYHQWHU WHVW WR SVLJ
3ODFH FHPHQW SOXJ LQ WKH FDVLQJ DFURVV WKH +DOR DQG 4DQQLN SUHVVXUH WHVW DQG WDJ
;;
GWV
Jessie L.
Chmielowski
Digitally signed by Jessie
L. Chmielowski
Date: 2022.09.06
11:34:43 -08'00'
RBDMS JSB 090722
&RQRFR3KLOOLSV$ODVND,QF
3RVW2IILFH%R[
$QFKRUDJH$ODVND
7HOHSKRQH
$XJXVW
$ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ
:HVWWK$YHQXH6XLWH
$QFKRUDJH$ODVND
5H&KDQJHWR$SSURYHG6XQGU\IRU&58&'37'
'HDU6LURU0DGDP
&RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUDVXQGU\SHUPLWWRUHHQWHUWKH&'ZHOOZLWKWKHLQWHQWLRQWRFHPHQWWKH
4DQQLN+DORIRUPDWLRQVDQGVHWDNLFNRIISOXJIRUIXWXUHVLGHWUDFNRSHUDWLRQV)XWXUHGULOOLQJRSHUDWLRQVLQFOXGHGULOOLQJ
´LQWHUPHGLDWHVHFWLRQDQGFHPHQWHGZLWK´FDVLQJ7KHSURGXFWLRQLQWHUYDOZLOOSHQHWUDWHWKH6DJ5LYHUDQG,YLVKDN
GLVSRVDO]RQHDQGZLOOEHGULOOHGZLWK´KROHFDVHGDQGFHPHQWHGZLWK´OLQHU7KHSUHGLFWHGVWDUWGDWHIRUWKHUHHQWU\
DQGSOXJVHWWLQJRSHUDWLRQVLV'R\RQ5LJZLOOSHUIRUPWKHZRUN
7KLVRSHUDWLRQLVSODQQHGIROORZLQJWKHSUHULJDEDQGRQPHQWZRUNGHWDLOHGLQDVXQGU\VXEPLWWHG
7KHVLGHWUDFNLQJSURFHGXUHVZLOOEHFRYHUHGLQDVHSDUDWH$SSOLFDWLRQIRUD3HUPLWWR'ULOO&'$
3OHDVHILQGDWWDFKHGWKHLQIRUPDWLRQUHTXLUHGE\$&&DDQGFIRU\RXUUHYLHZ3HUWLQHQWLQIRUPDWLRQ
DWWDFKHGWRWKLVDSSOLFDWLRQLQFOXGHVWKHIROORZLQJ
)RUP
$SURSRVHGUHHQWU\DQGDEDQGRQPHQWSURJUDP
&'FXUUHQWVFKHPDWLF
&'SUHULJDEDQGRQPHQWVFKHPDWLF
&'VHWXSIRUVLGHWUDFNVFKHPDWLF
,QIRUPDWLRQSHUWLQHQWWRWKHDSSOLFDWLRQWKDWLVSUHVHQWO\RQILOHDWWKH$2*&&
'LDJUDPVRIWKH%23HTXLSPHQWGLYHUWHUHTXLSPHQWDQGFKRNHPDQLIROGOD\RXWDVUHTXLUHGE\
$&&DDQGE
$GHVFULSWLRQRIWKHGULOOLQJIOXLGVKDQGOLQJV\VWHP
'LDJUDPRIULVHUVHWXS
,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHIXUWKHULQIRUPDWLRQSOHDVHFRQWDFW0DWW1DJHODW
PDWWEQDJHO#FRQRFRSKLOOLSVFRP RU&KULV%ULOORQDW
6LQFHUHO\ FF
&':HOO)LOH-HQQD7D\ORU $72
'DYH/HH$72
0DWW1DJHO &KULV%ULOORQ $72
'ULOOLQJ(QJLQHHU/D\OD8QJHU$72
$QG\0DFN.XXNSLN&RUS
LQWHQWLRQWRFHPHQWWKHS \SS \S
4DQQLN+DORIRUPDWLRQVDQGVHWDNLFNRIISOXJIRUIXWXUHVLGHWUDFNRSHUDWLRQVWW
Change to Approved Sundry, Well CRU CD1-33
6DYHG$XJ
Change to Approved Sundry, Well CRU CD1-33
Page 1 of 5
Printed: 4-Aug-22
ϭͲϯϯ
ƉƉůŝĐĂƚŝŽŶĨŽƌŚĂŶŐĞƚŽƉƉƌŽǀĞĚWĞƌŵŝƚƚŽƌŝůů
dĂďůĞŽĨŽŶƚĞŶƚƐ
tĞůůEĂŵĞ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĨͿͿ
WƌŽƉŽƐĞĚƌŝůůŝŶŐWƌŽŐƌĂŵ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĐͿ;ϭϯͿͿ
ƚƚĂĐŚŵĞŶƚƐ
ƚƚĂĐŚŵĞŶƚϭƵƌƌĞŶƚ^ĐŚĞŵĂƚŝĐ ................................................................................................................ 3
ƚƚĂĐŚŵĞŶƚϮWƌĞͲƌŝŐĂďĂŶĚŽŶŵĞŶƚƐĐŚĞŵĂƚŝĐ ............................................................................................ 4
ƚƚĂĐŚŵĞŶƚϯ^ĞƚƵƉĨŽƌƐŝĚĞƚƌĂĐŬƐĐŚĞŵĂƚŝĐ ............................................................................................... 5
Change to Approved Sundry, Well CRU CD1-33
6DYHG$XJ
Change to Approved Sundry, Well CRU CD1-33
Page 2 of 5
Printed: 4-Aug-22
tĞůůEĂŵĞ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĨͿͿ
dŚĞǁĞůůĨŽƌǁŚŝĐŚƚŚŝƐĂƉƉůŝĐĂƚŝŽŶŝƐƐƵďŵŝƚƚĞĚǁŝůůďĞĚĞƐŝŐŶ ĂƚĞĚĂƐZhϭͲϯϯ͘
WƌŽƉŽƐĞĚƌŝůůŝŶŐWƌŽŐƌĂŵ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĐͿ;ϭϯͿͿ
dŚĞƉƌŽƉŽƐĞĚĚƌŝůůŝŶŐƉƌŽŐƌĂŵŝƐůŝƐƚĞĚďĞůŽǁ͘
ϭ͘D/ZhŽLJŽŶϭϰϮ͘
Ϯ͘dĞƐƚϳ͟ĐĂƐŝŶŐ͕ϳ͟ĐĂƐŝŶŐƉĂĐŬŽĨĨĂŶĚWsƚŚƌŽƵŐŚŝŶŶĞƌĂŶŶƵůƵ ƐƚŽϮ͕ϬϬϬƉƐŝĨŽƌϭϬŵŝŶƵƚĞƐ͕ĐŚĂƌƚWd͘
ϯ͘dĞƐƚƚƌĞĞĂĚĂƉƚŽƌƚŽϱ͕ϬϬϬƉƐŝ͘
ϰ͘WƵůůWs͘
ϱ͘ŝƌĐƵůĂƚĞĚŝĞƐĞůĨƌĞĞnjĞƉƌŽƚĞĐƚŽǀĞƌƚŽϵ͘ϴƉƉŐŬŝůůǁĞŝŐŚƚŵƵĚƚŚƌŽƵŐŚƚƌĞĞ͕ƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚŝŐĞƌƚĂŶŬ͘
ϲ͘^ĞƚWsĂŶĚƚĞƐƚƚŚƌŽƵŐŚŝŶŶĞƌĂŶŶƵůƵƐƚŽϭ͕ϱϬϬƉƐŝ͘
ϳ͘^ĞƚďůĂŶŬŝŶŐƉůƵŐ͘
ϴ͘EŝƉƉůĞĚŽǁŶƚƌĞĞ͘
ϵ͘EŝƉƉůĞƵƉKWĂŶĚƚĞƐƚƚŽϮϱϬͬϰϬϬϬƉƐŝǁŝƚŚϯ͘ϱ͕͟ϰ͟Θϰ͘ϱ͘͟
ϭϬ͘ZĞŵŽǀĞďůĂŶŬŝŶŐƉůƵŐĂŶĚWs͘
ϭϭ͘WƵůůϰͲϭͬϮ͟ƚƵďŝŶŐ;ƉƌĞͲĐƵƚĂƚΕϰ͕ϰϬϬDͿ͘
ϭϮ͘ZƵŶŝŶŚŽůĞǁŝƚŚ/WŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚƐĞƚĂƚΕϰ͕ϮϭϮ͛D͘WdƚŽϮ͕ϱϬϬƉƐŝ͘
ϭϯ͘ZŝŐƵƉŚĂƌĚůŝŶĞĨƌŽŵKǀĂůǀĞƚŽĐŚŽŬĞŵĂŶŝĨŽůĚ͘
ϭϰ͘ZƵŶŝŶŚŽůĞǁŝƚŚĚƌŝůůƉŝƉĞĐŽŶǀĞLJĞĚƉĞƌĨŽƌĂƚŝŶŐŐƵŶƐ͘WĞƌĨŽƌĂƚĞϳ͟ĐĂƐŝŶŐĂƚϰ͕ϮϬϮ͛D͘
ϭϱ͘ŝƌĐƵůĂƚĞϵ͘ϴƉƉŐ<t&ƚŚƌŽƵŐŚKǀĂůǀĞƚĂŬŝŶŐƌĞƚƵƌŶƐƚŚƌŽƵŐŚĐŚŽŬĞŵĂŶŝĨŽůĚƚŽƚŝŐĞƌƚĂŶŬ͘
ϭϲ͘ZƵŶŝŶŚŽůĞǁŝƚŚĐĞŵĞŶƚƌĞƚĂŝŶĞƌƚŽϰ͕ϭϱϬ͛DĂŶĚĐĞŵĞŶƚKƚŽϮϵϲϭ͛D;ϭϬϬ͛DĂďŽǀĞ,ĂůŽͿ
ϭϳ͘ZƵŶŝŶŚŽůĞǁŝƚŚ/WŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚƐĞƚĂƚΕϮ͕ϳϬϬ͛D͘WdƚŽϮ͕ϱϬϬƉƐŝ
ϭϴ͘ZƵŶŝŶŚŽůĞǁŝƚŚŵĞĐŚĂŶŝĐĂůĐĂƐŝŶŐĐƵƚƚĞƌŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚĐ ƵƚĐĂƐŝŶŐĂƚϮ͕ϲϱϬ͛ΘϮ͕ϯϬϬ͛D͘
ϭϵ͘^ǁĂƉϯ͘ϱ͟džϲ͟ƌĂŵƐƚŽϳ͟ĐĂƐŝŶŐƌĂŵƐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƚŽϮϱϬͬϰϬϬϬƉƐŝ͘
ϮϬ͘WƵůůϳ͟ĐĂƐŝŶŐƚŽƐƵƌĨĂĐĞĂŶĚůĂLJĚŽǁŶ͘
Ϯϭ͘^ǁĂƉϳ͟ĐĂƐŝŶŐƌĂŵƐƚŽϯ͘ϱ͟džϲ͟ƌĂŵƐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘
ϮϮ͘ZŝŐƵƉůƵďƌŝĐĂƚŽƌĂŶĚZ/,ǁŝƚŚ>ƚŽůŽŐƐƵƌĨĂĐĞĐĂƐŝŶŐŝŶƚĞŐƌŝƚLJ͘
Ϯϯ͘Z/,ǁŝƚŚϯ͘ϱ͟ĐĞŵĞŶƚƐƚŝŶŐĞƌĂŶĚƐĞƚĐĞŵĞŶƚŬŝĐŬŽĨĨƉůƵŐĨƌŽŵƚŚĞƚŽƉŽĨďƌŝĚŐĞƉůƵŐƚŽϮϬϬĨƚŝŶƐŝĚĞƚŚĞ
ƐƵƌĨĂĐĞƐŚŽĞ͘
Ϯϰ͘WͬhĚŝƌĞĐƚŝŽŶĂůĚƌŝůůŝŶŐ,ĂŶĚZ/,͘dĂŐdKĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐĂŶĚŬŝĐŬŽĨĨƉůƵŐƚŽϮ͕ϱϬϬƉƐŝ͘
Ϯϱ͘ZĞĂĚLJƚŽŵŽǀĞŝŶƚŽĚƌŝůůŝŶŐƉŚĂƐĞƵŶĚĞƌŶĞǁWd͘
Ϯϲ͘ĞŐŝŶŶĞǁWd͘
ĞŵĞŶƚŝŶŐĂůĐƵůĂƚŝŽŶƐ
ϳ͟WůƵŐĨŽƌYĂŶŶŝŬͬ,ĂůŽ/ƐŽůĂƚŝŽŶĨƌŽŵϰ͕ϮϬϮ͛DƚŽϮ͕ϵϲϭ͛DǁŝƚŚϭϱ͘ϴƉƉŐůĂƐƐ'нĂĚĚŝƚŝǀĞƐ
dŽƚĂůsŽůƵŵĞсϯϰďďůƐсхϭϲϱƐdžŽĨϭϱ͘ϴƉƉŐůĂƐƐ'Λϭ͘ϭϲĨƚϯͬƐŬ
<ŝĐŬͲŽĨĨWůƵŐĨƌŽŵϮ͕ϳϬϬ͛DƚŽϮ͕ϭϳϲ͛DǁŝƚŚϭϳ͘ϬƉƉŐůĂƐƐ'нĂĚĚŝƚŝǀĞƐ
dŽƚĂůsŽůƵŵĞсϱϰďďůƐсхϯϬϯƐdžŽĨϭϳ͘ϬƉƉŐůĂƐƐ'Λϭ͘ϬϬĨƚϯͬƐŬ
&%/ UTG
$2*&& ZLWQHVV UHTXLUHG RI 37 DQG WDJ
97/
97/
)URP1DJHO0DWW%
7R/RHSS9LFWRULD72*&6PLWK7UDYLV7
6XEMHFW5(>(;7(51$/@&58&'3OXJIRU5HGULOO
'DWH7KXUVGD\6HSWHPEHU30
hŶĚĞƌƐƚŽŽĚ͘dŚĂŶŬƐ͘
0DWW1DJHO
'ULOOLQJ(QJLQHHU
&RQRFR3KLOOLSV$ODVND
2IILFH
&HOO
0DWW%1DJHO#&RQRFR3KLOOLSVFRP
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗dŚƵƌƐĚĂLJ͕^ĞƉƚĞŵďĞƌϭ͕ϮϬϮϮϮ͗ϬϲWD
dŽ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖^ŵŝƚŚ͕dƌĂǀŝƐd
фdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ydZE>ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů
DĂƚƚ͕
dŚĞĐĞŵĞŶƚĂĐƌŽƐƐƚŚĞYĂŶŶŝŬͬ,ĂůŽǁŝůůƌĞƋƵŝƌĞĂ>ƚŽǀĞƌŝĨLJĐĞŵĞŶƚƉůĂĐĞŵĞŶƚ͘
sŝĐƚŽƌŝĂ
Victoria Loepp
6HQLRU3HWUROHXP(QJLQHHU
6WDWHRI$ODVND
2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ
:WK$YH
$QFKRUDJH$.
:RUN
9LFWRULD/RHSS#DODVNDJRY
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska
Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended
recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure
of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please
delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you,
contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov
&ƌŽŵ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭ͗ϱϲWD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖^ŵŝƚŚ͕dƌĂǀŝƐd
фdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗ydZE>Z͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů
,ŝsŝĐƚŽƌŝĂ͕
WůĞĂƐĞƐĞĞŵLJƌĞƐƉŽŶƐĞƐďĞůŽǁŝŶƌĞĚ͘
0DWW1DJHO
'ULOOLQJ(QJLQHHU
&RQRFR3KLOOLSV$ODVND
2IILFH
&HOO
0DWW%1DJHO#&RQRFR3KLOOLSVFRP
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭϮ͗ϭϮWD
dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖EĂŐĞů͕DĂƚƚ
фDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ydZE>Z͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů
dƌĂǀŝƐ͕DĂƚƚ͕
YƵĞƐƚŝŽŶƐŽŶ^ƵŶĚƌLJϯϮϮͲϰϱϵ
ϭ͘ ,ŽǁǁŝůůLJŽƵǀĞƌŝĨLJƚŚĞϳ͟džK,ĐĞŵĞŶƚŝŶŐĂĐƌŽƐƐƚŚĞ,ĂůŽĂŶĚYĂŶŶŝŬ͍DĂLJŶĞĞĚĂ>͘
tĞĂƌĞŶŽƚƉůĂŶŶŝŶŐŽŶůŽŐŐŝŶŐƚŚĞϳ͟džK,ĐĞŵĞŶƚƉůƵŐ͘dŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐǁŝůůďĞůŽŐŐĞĚ
ƚŽǀĞƌŝĨLJďŽƚŚƐƵƌĨĂĐĞĐĂƐŝŶŐĂŶĚƐƵƌĨĂĐĞĐĂƐŝŶŐĐĞŵĞŶƚŝŶƚĞŐƌŝƚLJ͘ůƐŽ͕ĂĨƚĞƌƉƵŵƉŝŶŐƚŚĞ
ŬŝĐŬŽĨĨƉůƵŐŝŶƐŝĚĞƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐ͕ƚŚĞĐĂƐŝŶŐǁŝůůďĞƉƌĞƐƐƵƌĞƚĞƐƚĞĚϮϱϬϬƉƐŝƚŽĞŶƐƵƌĞ
ŝƐŽůĂƚŝŽŶĨƌŽŵďĞůŽǁ͘
Ϯ͘ tŚLJŶŽƚĂĐĞŵĞŶƚƉůƵŐŝŶƐŝĚĞƚŚĞϳ͟ĐĂƐŝŶŐĂĐƌŽƐƐƚŚĞYĂŶŶŝŬĂŶĚ,ĂůŽ͍
dŚĞƌĞǁŝůůďĞĐĞŵĞŶƚĂďŽǀĞƚŚĞĂďĂŶĚŽŶŵĞŶƚƉĞƌĨŽƌĂƚŝŽŶƐĂŶĚŽŶƚŽƉŽĨƚŚĞďƌŝĚŐĞƉůƵŐ͘
dŚĞďƌŝĚŐĞƉůƵŐďĞůŽǁƚŚĞƉĞƌĨŽƌĂƚŝŽŶƐĂŶĚƚŚĞďƌŝĚŐĞƉůƵŐďĞůŽǁƚŚĞŝŶƚĞƌŵĞĚŝĂƚĞĐĂƐŝŶŐ
ĐƵƚ͕ĂůŽŶŐǁŝƚŚƚŚĞƐƵƌĨĂĐĞŬŝĐŬŽĨĨƉůƵŐ͕ǁŝůůƉƌŽǀŝĚĞŽƵƌŝƐŽůĂƚŝŽŶŽĨƚŚĞϳ͟ĐĂƐŝŶŐ͘
ϯ͘ tŚĂƚĚĞƉƚŚŝƐƚŚĞYĂŶŶŝŬďŽƚƚŽŵŽĨƐĂŶĚ͍
ŽƚƚŽŵŽĨYĂŶŶŝŬƐĂŶĚŝƐƉŝĐŬĞĚƚŽďĞϰϮϮϱ͛DͬϰϬϳϬ͛ds͘
ϰ͘ DW^WŽŶƐƵŶĚƌLJŝƐϯϴϰϲƉƐŝ͕ŽŶWdŝƐϯϱϵϰƉƐŝ͘KWƚĞƐƚƉƌĞƐƐƵƌĞǁŝůůďĞƚŚĞƐĂŵĞŽŶďŽƚŚ͘
ϰϮϬϬƉƐŝ͘
hŶĚĞƌƐƚŽŽĚ͘
sŝĐƚŽƌŝĂ
Victoria Loepp
6HQLRU3HWUROHXP(QJLQHHU
6WDWHRI$ODVND
2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ
:WK$YH
$QFKRUDJH$.
:RUN
9LFWRULD/RHSS#DODVNDJRY
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska
Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP
'RQRWFOLFNOLQNVRURSHQDWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZ
WKHFRQWHQWLVVDIH
recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure
of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please
delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you,
contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov
&ƌŽŵ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭϬ͗ϰϭD
dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ƵďũĞĐƚ͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů
,ĞůůŽsŝĐƚŽƌŝĂͶ
/ǁĂƐĐƵƌŝŽƵƐĂďŽƵƚƚŚŝƐϭͲϯϯƉƌŽŐƌĂŵͶĚŽLJŽƵŚĂǀĞĂŶLJŽƚŚĞƌƋƵĞƐƚŝŽŶƐĨŽƌƚŚŝƐŽŶĞ͍
dŚĂŶŬƐǀĞƌLJŵƵĐŚ͊
dƌĂǀŝƐ
&ƌŽŵ͗^ŵŝƚŚ͕dƌĂǀŝƐd
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϮϰ͕ϮϬϮϮϰ͗ϭϭWD
dŽ͗Ζ>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿΖфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗ydZE>ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů
,ĞůůŽsŝĐƚŽƌŝĂͶ
^ĞĞƚŚĞĂƚƚĂĐŚĞĚƌĞǀŝƐĞĚKǀĞƌǀŝĞǁWƌŽĐĞĚƵƌĞ͕ĂƐǁĞůůĂƐŵLJĂŶƐǁĞƌƐďĞůŽǁ͘WůĞĂƐĞůĞƚŵĞŬŶŽǁŝĨ
LJŽƵŶĞĞĚŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ͊
dƌĂǀŝƐ
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϭϳ͕ϮϬϮϮϭϭ͗ϰϬD
dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ydZE>ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů
CAUTION:This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
dƌĂǀŝƐ͕
ϭ͘ WůĞĂƐĞƉƌŽǀŝĚĞDW^W
Ă͘ >ĂƐƚ^,W;ϴͬϲͬϮϮͿǁĂƐϰϱϰϲƉƐŝĂƚϳϲϯϲ͛D;ϲϵϵϲ͛dsͿ͘hƐŝŶŐĂϬ͘ϭƉƐŝͬĨƚŐƌĂĚŝĞŶƚ͕
ƚŚĞDW^WŝƐϯϴϰϲƉƐŝ͘
Ϯ͘ /ƐĂĐĞŵĞŶƚďŽŶĚůŽŐĂǀĂŝůĂďůĞĨŽƌƚŚĞϳ͍͟,ŽǁǁĂƐƚŚĞdKŽĨϲϳϬϬ͛DĚĞƚĞƌŵŝŶĞĚ͍
Ă͘ dŚĞϲϳϬϬ͛DŝƐďĂƐĞĚŽŶĂǀŽůƵŵĞƚƌŝĐĐĂůĐƵůĂƚŝŽŶŽĨƚŚĞĐĞŵĞŶƚƉƵŵƉĞĚ͘ĂƐĞĚŽŶ
ŽƚŚĞƌĂƐƐƵŵƉƚŝŽŶƐĨƌŽŵƐŝŵŝůĂƌǁĞůůƐŽĨƚŚĞĞƌĂ͕/͛ĚůŝŬĞƚŽƵƐĞĂϰϬйĞdžĐĞƐƐĂƐƐƵŵƉƚŝŽŶ
ǁŚŝĐŚǁŽƵůĚƉůĂĐĞƚŚĞĞƐƚŝŵĂƚĞĚdKĂƚϳ͕Ϭϯϲ͛D͘>ǁĂƐƌƵŶƚŚƌŽƵŐŚͲƚƵďŝŶŐƚŚĂƚ
ƐŚŽǁĞĚŐŽŽĚĐĞŵĞŶƚƚŽƚŚĞƚƵďŝŶŐƚĂŝůĂƚϳ͕ϲϱϯ͛D͘
ϯ͘ >ĂƐƚD/dͲ/ĂŶĚD/dͲd͍
Ă͘ ϲͬϭϰͬϮϭ͕ŶŽŶͲǁŝƚŶĞƐƐĞĚD/d/ƉĂƐƐĞĚƚŽϮ͕ϰϬϬƉƐŝ͘EŽƌĞĐĞŶƚD/ddƐ͘
ϰ͘ WůĞĂƐĞƉƌŽǀŝĚĞĨŽƌŵĂƚŝŽŶƉŝĐŬƐĨŽƌƚŚĞůƉŝŶĞŽŶƚŚĞt^
Ă͘ ϳϲϴϮ͛DŝƐůƉŝŶĞƚŽƉ͘^ĞĞĂƚƚĂĐŚĞĚƐĐŚĞŵĂƚŝĐŝŶƚŚĞKǀĞƌǀŝĞǁ͘
ϱ͘ ĂŶLJŽƵWdĂŶĚƚĂŐĂĨƚĞƌƚŚĞůƉŝŶĞƉůƵŐŝƐƐĞƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌĂƚϳϲϮϱ͛D͍dŚŝƐƉůƵŐǁŝůů
ŶĞĞĚƚŽďĞǀĞƌŝĨŝĞĚ͘
Ă͘ zĞƐ͕ǁĞĐĂŶďƌĞĂŬƚŚĞĐĞŵĞŶƚŝŶŐŝŶƚŽƚǁŽũŽďƐƚŽƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘dŚŝƐǁŽƌŬĨůŽǁ
ŝƐĚĞƚĂŝůĞĚŝŶƚŚĞƌĞǀŝƐĞĚWƌŽĐĞĚƵƌĞKǀĞƌǀŝĞǁĂƚƚĂĐŚĞĚŚĞƌĞ͘
ϲ͘ yEŶŝƉƉůĞĚĞƉƚŚŵŝƐůĂďĞůĞĚŽŶƐĐŚĞŵĂƚŝĐ͘^ŚŽƵůĚďĞϳϲϰϮ͛D͘
Ă͘ dŚĂŶŬLJŽƵ͕ƵƉĚĂƚĞĚ͘
dŚĂŶdž͕
sŝĐƚŽƌŝĂ
Victoria Loepp
6HQLRU3HWUROHXP(QJLQHHU
6WDWHRI$ODVND
2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ
:WK$YH
$QFKRUDJH$.
:RUN
9LFWRULD/RHSS#DODVNDJRY
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska
Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended
recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure
of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please
delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you,
contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov
Change to Approved Sundry, Well CRU CD1-33
6DYHG$XJ
Change to Approved Sundry, Well CRU CD1-33
Page 3 of 5
Printed: 4-Aug-22
ƚƚĂĐŚŵĞŶƚƐ
ƚƚĂĐŚŵĞŶƚϭƵƌƌĞŶƚ^ĐŚĞŵĂƚŝĐ
Change to Approved Sundry, Well CRU CD1-33
6DYHG$XJ
Change to Approved Sundry, Well CRU CD1-33
Page 4 of 5
Printed: 4-Aug-22
ƚƚĂĐŚŵĞŶƚϮWƌĞͲƌŝŐĂďĂŶĚŽŶŵĞŶƚƐĐŚĞŵĂƚŝĐ
Change to Approved Sundry, Well CRU CD1-33
6DYHG$XJ
Change to Approved Sundry, Well CRU CD1-33
Page 5 of 5
Printed: 4-Aug-22
ƚƚĂĐŚŵĞŶƚϯ^ĞƚƵƉĨŽƌƐŝĚĞƚƌĂĐŬƐĐŚĞŵĂƚŝĐ
!
" #
$!
%
"
&&&&&&&&&&&&&&&&&&&
'$ (""
)*$
+, *#
-
#
./$
0/ 1$$
"
##
!
2
,2 3
$
4*
56
$7 895
7
* :*5 7 * ;*5 7 + #* :* + #* ;* :5
7
5:*7 <=5:*7
81)(>$
"
/
6
=
; =
;:*5 7;*5 7
'
-"
!=
*
?= +, *# #
(+
* )
!=
"
/6 /$< *6
.;# * @ @ @
6A@
@""
#@/$< !
"$
"+
"
B
"
#$ @""
#!
$
/ ?
: /
6"
//C:/
>23
$
+,
23
$
;+*?3
# ":://$+
D+@"" *
" " + @
+
08)4> 81)(> 08)4> $
D0101%81)(>:*
01((>
D08-4%08)4>;*
(%9'E
=?=%-=
;$
'-(8>
0101>
* :*5 7
.E
4%)91E
0.> (>
'-00>
08-4>0E
6%18
0.)(>
(>
'-0.>
!"!# $$# !%&'
+6F
6F/6$*@"$+
;/$":://$
&$&$# !(#!% '!&#&
'8"')'18
&)
*
?,88-.8G GF44)8 *
+*+,**
"
=G/
%!
*++$9
-
!-
!(
.!&
!#!
@ :*5 7
=0)40>:*.41>;*
;$9
* ;*5 7 B
0/
# !# ! !#
B$
*! *
!&#/!%!# '
/#
/+
#
#
H
54807.08%(8(
8%(8-
#
89'8'& -
.! 0!!-.!1!
!2!12!
!.
!1! -3
By Anne Prysunka at 4:02 pm, Aug 03, 2022
Travis Smith Digitally signed by Travis Smith
Date: 2022.08.03 15:35:57
-08'00'
;
%DUHIRRW &RPSOHWLRQ
'65'/%
;
'/%
;
&':
'/%
;
;
97/
SVL
GWV -/&
Jeremy
Price
Digitally signed by
Jeremy Price
Date: 2022.09.01
13:24:20 -08'00'
RBDMS JSB 090722
ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ WĂŐĞϭ
ĂƚĞ͗ ƵŐƵƐƚϮϯ͕ϮϬϮϮ
^ƵďũĞĐƚ͗ ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚKǀĞƌǀŝĞǁ͕ZĞǀ͘ϭ
WƌĞƉĂƌĞĚLJ͗dƌĂǀŝƐ^ŵŝƚŚ͕ϲϳϬͲϰϬϭϰ
KďũĞĐƚŝǀĞ
ϭͲϯϯŝƐĂŶůƉŝŶĞŝŶũĞĐƚŽƌŽƌŝŐŝŶĂůůLJĚƌŝůůĞĚĂŶĚĐŽŵƉůĞƚĞĚŝŶϮϬϬϭ͘dŚĞǁĞůůǁĂƐƌĞĐĞŶƚůLJ
ĐŽŶǀĞƌƚĞĚƚŽƉƌŽĚƵĐƚŝŽŶƚŽĚĞͲƉƌĞƐƐƵƌĞƚŚĞůƉŝŶĞŝŶƚĞƌǀĂůĨŽƌĚŝƐƉŽƐĂůǁĞůůĚƌŝůůŝŶŐ͘ϭͲϯϯŚĂƐ
ďĞĞŶŝĚĞŶƚŝĨŝĞĚĂƐĂŵŽƚŚĞƌďŽƌĞĚŽŶŽƌĨŽƌĂŶĞǁůƉŝŶĞĚŝƐƉŽƐĂůŝŶũĞĐƚŝŽŶǁĞůů͘dŚŝƐƉƌŽƉŽƐĂů
ĚĞƚĂŝůƐƚŚĞƚŚƌŽƵŐŚͲƚƵďŝŶŐĂďĂŶĚŽŶŵĞŶƚŽĨƚŚĞϭͲϯϯůƉŝŶĞŝŶƚ ĞƌǀĂůƚŽƉƌĞƉĂƌĞƚŚĞǁĞůůĨŽƌ
ƚŚĞƐŝĚĞƚƌĂĐŬŽƉƉŽƌƚƵŶŝƚLJ͘
WƌŽĐĞĚƵƌĞ
^ůŝĐŬůŝŶĞ
ϭ͘WƵůůͲϭŝŶũĞĐƚŝŽŶǀĂůǀĞĨƌŽŵͲŶŝƉƉůĞĂƚϭ͕ϳϮϯ͛D͘
Ϯ͘DĞĂƐƵƌĞ^,WŽĨůƉŝŶĞƌĞƐĞƌǀŽŝƌ͘
ŽŝůĞĚdƵďŝŶŐ
ϭ͘^ĞƚĂĐĞŵĞŶƚƌĞƚĂŝŶĞƌũƵƐƚďĞůŽǁƚŚĞĂŬĞƌ^ͲϯƉĂĐŬĞƌ͕ĂƚĂƉƉƌŽdžŝŵĂƚĞůLJϳ͕ϲϮϱ͛D͘
Ϯ͘ŽŶĨŝƌŵŝŶũĞĐƚŝǀŝƚLJƚĞƐƚŽĨŽƉĞŶŚŽůĞƐĞĐƚŝŽŶďLJƉƵŵƉŝŶŐƐĞĂǁĂƚĞƌƚŚƌŽƵŐŚƚŚĞĐĞŵĞŶƚ
ƌĞƚĂŝŶĞƌ͘
ϯ͘ďĂŶĚŽŶůƉŝŶĞƌĞƐĞƌǀŽŝƌďLJƉƵŵƉŝŶŐĂƉƉƌŽdžŝŵĂƚĞůLJϭϭϬďďůƐŽĨϭϱ͘ϴƉƉŐůĂƐƐ'
ĐĞŵĞŶƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌ͘hŶͲƐƚŝŶŐĨƌŽŵƌĞƚĂŝŶĞƌĂŶĚůĂLJĂƉƉƌŽdžŝŵĂƚĞůLJϭďďůŽĨĐĞŵĞŶƚ
ŽŶƌĞƚĂŝŶĞƌ͘
^ůŝĐŬůŝŶĞͬ&ƵůůďŽƌĞ
ϭ͘dĂŐƚŽƉŽĨĐĞŵĞŶƚŝŶϰͲϭͬϮ͟ƚƵďŝŶŐ͘
Ϯ͘WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐƚŽϮ͕ϬϬϬƉƐŝ͘
ϯ͘WƌĞƐƐƵƌĞƚĞƐƚ/ƚŽϮ͕ϬϬϬƉƐŝ͘
ͲůŝŶĞ
ϭ͘WƵŶĐŚƚƵďŝŶŐũƵƐƚĂďŽǀĞƚŚĞĂŬĞƌ^ͲϯƉĂĐŬĞƌĂƚϳ͕ϱϵϳ͛D͘
Ϯ͘ŝƌĐƵůĂƚĞƚƵďŝŶŐƚŽ/ƚŚƌŽƵŐŚƚŚĞƚƵďŝŶŐƉƵŶĐŚĞƐƚŽǀĞƌŝĨLJŐŽŽĚĐŽŵŵƵŶŝĐĂƚŝŽŶ͘
&ƵůůďŽƌĞ
ϭ͘ZŝŐƵƉƚŽƉƵŵƉĚŽǁŶƚŚĞƚƵďŝŶŐƚĂŬŝŶŐƌĞƚƵƌŶƐĨƌŽŵƚŚĞ/ƚŚƌŽƵ ŐŚƚŚĞƚƵďŝŶŐƉƵŶĐŚ͘
ƐƚĂďůŝƐŚĐŝƌĐƵůĂƚŝŽŶƚŚƌŽƵŐŚƚŚĞƉƵŶĐŚ͕ƚŚĞŶƉƵŵƉϰϱďďůƐŽĨĐ ĞŵĞŶƚĨŽůůŽǁĞĚďLJĂ
ĨŽĂŵǁŝƉĞƌďĂůů͘ŝƐƉůĂĐĞƚŽϲ͕ϬϬϬ͛DǁŝƚŚϵϭďďůƐŽĨĚŝƐƉůĂĐĞŵĞŶƚ͘
97/
6WDWH ZLWQHVV WDJ DQG SUHVVXUH WHVW
ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ WĂŐĞϮ
^ůŝĐŬůŝŶĞͬ&ƵůůďŽƌĞ
ϭ͘dĂŐƚŽƉŽĨĐĞŵĞŶƚŝŶϰͲϭͬϮ͟ƚƵďŝŶŐ͘džƉĞĐƚĞĚƚŽƉŽĨĐĞŵĞŶƚŝƐĂƚĂƉƉƌŽdžŝŵĂƚĞůLJϲ͕ϬϬϬ͛
D͘
Ϯ͘WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐƚŽϮ͕ϬϬϬƉƐŝ͘
ϯ͘WƌĞƐƐƵƌĞƚĞƐƚ/ƚŽϮ͕ϬϬϬƉƐŝ͘
ͲůŝŶĞ
ϭ͘ƵƚϰͲϭͬϮ͟ƚƵďŝŶŐĂƚΕϰ͕ϰϬϬ͛D͘
6WDWH ZLWQHVV WDJ DQG SUHVVXUH WHVW 97/
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRW
FOLFNOLQNVRURSHQDWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHU DQGNQRZWKHFRQWHQW
LVVDIH
)URP6PLWK7UDYLV7
7R/RHSS9LFWRULD72*&
&F1DJHO0DWW%
6XEMHFW5(>(;7(51$/@&58&'37'6XQGU\3OXJIRU5HGULOO
'DWH:HGQHVGD\$XJXVW30
$WWDFKPHQWV&'2YHUYLHZ5HYSGI
,ĞůůŽsŝĐƚŽƌŝĂͶ
^ĞĞƚŚĞĂƚƚĂĐŚĞĚƌĞǀŝƐĞĚKǀĞƌǀŝĞǁWƌŽĐĞĚƵƌĞ͕ĂƐǁĞůůĂƐŵLJĂŶƐǁĞƌƐďĞůŽǁ͘WůĞĂƐĞůĞƚŵĞŬŶŽǁŝĨ
LJŽƵŶĞĞĚŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ͊
dƌĂǀŝƐ
&ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϭϳ͕ϮϬϮϮϭϭ͗ϰϬD
dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ydZE>ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů
CAUTION:This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
dƌĂǀŝƐ͕
ϭ͘ WůĞĂƐĞƉƌŽǀŝĚĞDW^W
Ă͘ >ĂƐƚ^,W;ϴͬϲͬϮϮͿǁĂƐϰϱϰϲƉƐŝĂƚϳϲϯϲ͛D;ϲϵϵϲ͛dsͿ͘hƐŝŶŐĂϬ͘ϭƉƐŝͬĨƚŐƌĂĚŝĞŶƚ͕
ƚŚĞDW^WŝƐϯϴϰϲƉƐŝ͘
Ϯ͘ /ƐĂĐĞŵĞŶƚďŽŶĚůŽŐĂǀĂŝůĂďůĞĨŽƌƚŚĞϳ͍͟,ŽǁǁĂƐƚŚĞdKŽĨϲϳϬϬ͛DĚĞƚĞƌŵŝŶĞĚ͍
Ă͘ dŚĞϲϳϬϬ͛DŝƐďĂƐĞĚŽŶĂǀŽůƵŵĞƚƌŝĐĐĂůĐƵůĂƚŝŽŶŽĨƚŚĞĐĞŵĞŶƚƉƵŵƉĞĚ͘ĂƐĞĚŽŶ
ŽƚŚĞƌĂƐƐƵŵƉƚŝŽŶƐĨƌŽŵƐŝŵŝůĂƌǁĞůůƐŽĨƚŚĞĞƌĂ͕/͛ĚůŝŬĞƚŽƵƐĞĂϰϬйĞdžĐĞƐƐĂƐƐƵŵƉƚŝŽŶ
ǁŚŝĐŚǁŽƵůĚƉůĂĐĞƚŚĞĞƐƚŝŵĂƚĞĚdKĂƚϳ͕Ϭϯϲ͛D͘>ǁĂƐƌƵŶƚŚƌŽƵŐŚͲƚƵďŝŶŐƚŚĂƚ
ƐŚŽǁĞĚŐŽŽĚĐĞŵĞŶƚƚŽƚŚĞƚƵďŝŶŐƚĂŝůĂƚϳ͕ϲϱϯ͛D͘
ϯ͘ >ĂƐƚD/dͲ/ĂŶĚD/dͲd͍
Ă͘ ϲͬϭϰͬϮϭ͕ŶŽŶͲǁŝƚŶĞƐƐĞĚD/d/ƉĂƐƐĞĚƚŽϮ͕ϰϬϬƉƐŝ͘EŽƌĞĐĞŶƚD/ddƐ͘
ϰ͘ WůĞĂƐĞƉƌŽǀŝĚĞĨŽƌŵĂƚŝŽŶƉŝĐŬƐĨŽƌƚŚĞůƉŝŶĞŽŶƚŚĞt^
Ă͘ ϳϲϴϮ͛DŝƐůƉŝŶĞƚŽƉ͘^ĞĞĂƚƚĂĐŚĞĚƐĐŚĞŵĂƚŝĐŝŶƚŚĞKǀĞƌǀŝĞǁ͘
ϱ͘ ĂŶLJŽƵWdĂŶĚƚĂŐĂĨƚĞƌƚŚĞůƉŝŶĞƉůƵŐŝƐƐĞƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌĂƚϳϲϮϱ͛D͍dŚŝƐƉůƵŐǁŝůů
ŶĞĞĚƚŽďĞǀĞƌŝĨŝĞĚ͘
Ă͘ zĞƐ͕ǁĞĐĂŶďƌĞĂŬƚŚĞĐĞŵĞŶƚŝŶŐŝŶƚŽƚǁŽũŽďƐƚŽƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘dŚŝƐǁŽƌŬĨůŽǁ
ŝƐĚĞƚĂŝůĞĚŝŶƚŚĞƌĞǀŝƐĞĚWƌŽĐĞĚƵƌĞKǀĞƌǀŝĞǁĂƚƚĂĐŚĞĚŚĞƌĞ͘
ϲ͘ yEŶŝƉƉůĞĚĞƉƚŚŵŝƐůĂďĞůĞĚŽŶƐĐŚĞŵĂƚŝĐ͘^ŚŽƵůĚďĞϳϲϰϮ͛D͘
Ă͘ dŚĂŶŬLJŽƵ͕ƵƉĚĂƚĞĚ͘
dŚĂŶdž͕
sŝĐƚŽƌŝĂ
Victoria Loepp
6HQLRU3HWUROHXP(QJLQHHU
6WDWHRI$ODVND
2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ
:WK$YH
$QFKRUDJH$.
:RUN
9LFWRULD/RHSS#DODVNDJRY
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska
Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended
recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure
of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please
delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you,
contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov
ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ WĂŐĞϯ
ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ WĂŐĞϰ
!""
#$
%&
##'
##&$#
(##
&#'
&
$
&
$
#$
#)
$ ###
##
(
)
)
#$
$ #
%&
##(
$
$ #
#
)#$
#$
$
##)
&*$$
'(
(##
%&
#)
+
$$#!,-(
(-
+.)#$
(
(&
% +*
$&*
!/0!,-(
(
&#
1
$&
)'&
&
(
(&
% #+*
$&*
$$
2
#'! /,-(
()
%&
' )$# &
'$$
&
(
(#$
'$$
$$
2
#'# )/(3$$# 4
&
(5
)
(5.#
($
)&1&
#&#
&*
*
)
1(
$
#/# )&*
##
)
1()
/#
$$&# 1
)&
$##
)##'
# )
&
"(/6
(
$#&
(
"()
& $$7
$ $#'
#)
8$
&
)
,
)&(
($)&
"96
(:2$&$)&
$$
2
#' ,
-(
(
$
(
(
1$
(
$
$
##)
&*$$
'(
683(5&('('
("96
;"",-(
683(5&('('
683(5&('('
"683(5&('('
/DVW7DJ
$QQRWDWLRQ 'HSWKIW.%(QG'DWH :HOOERUH /DVW0RG%\
/DVW7DJ&' OPRVERU
/DVW5HY5HDVRQ
$QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\
5HY5HDVRQ6%+36HW$ &'REHUU
&DVLQJ6WULQJV
7RSIW.%
6HW'HSWK«
2'LQ
&DVLQJ'HVFULSWLRQ
&21'8&725
,QVXODWHG
6HW'HSWKIW«
:W/HQOEIW
*UDGH
+
7RS&RQQHFWLRQ
:(/'('
,'LQ
7RSIW.%
6HW'HSWK«
2'LQ
&DVLQJ'HVFULSWLRQ
685)$&(
6HW'HSWKIW«
:W/HQOEIW
*UDGH
-
7RS&RQQHFWLRQ
%7&02'
,'LQ
7RSIW.%
6HW'HSWK«
2'LQ
&DVLQJ'HVFULSWLRQ
352'8&7,21
6HW'HSWKIW«
:W/HQOEIW
*UDGH
/
7RS&RQQHFWLRQ
%7&0
,'LQ
7RSIW.%
6HW'HSWK«
2'LQ
&DVLQJ'HVFULSWLRQ
23(1+2/(
6HW'HSWKIW«
:W/HQOEIW*UDGH 7RS&RQQHFWLRQ ,'LQ
/LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW
7RSIW.%
7RS79'
IW.%
7RS,QFO
,WHP'HV &RP 0DNH 0RGHO
1RPLQDO,'
LQ
23(1+2/(
7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ
7RSIW.%
6HW'HSWK«
6WULQJ0D«
7XELQJ'HVFULSWLRQ
78%,1*
6HW'HSWKIW.%
:WOEIW
*UDGH
/
7RS&RQQHFWLRQ
,%70
,'LQ
&RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.%
7RSIW.%
7RS79'
IW.%
7RS,QFO
,WHP'HV
2'
1RPLQDO
LQ&RP 0DNH 0RGHO
1RPLQDO
,'LQ
+$1*(5 )0&78%,1*+$1*(5 )0&
1,33/( &$0&2
'%
1,33/( &$0&2 '%
3$&.(5 %$.(563$&.(5 %DNHU 6
1,33/( +(6
;1
1,33/( +(6 ;1
:/(*:,5(/,1((175<*8,'( %DNHU
2WKHU,Q+ROH:LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF
7RSIW.%
7RS79'
IW.%7RS,QFO'HV &RP 0DNH 0RGHO 61 ,'LQ
,1-9$/9( $,QMHFWLRQ9DOYHRQ
'%/RFN
+66
1RWHV*HQHUDO 6DIHW\
(QG'DWH $QQRWDWLRQ
127(9,(:6&+(0$7,&Z$ODVND6FKHPDWLF
&'30
9HUWLFDOVFKHPDWLFDFWXDO
23(1+2/(
352'8&7,21
3$&.(5
685)$&(
,1-9$/9(
1,33/(
&21'8&725,QVXODWHG
:16352'
.%*UGIW
55'DWH
2WKHU(OHY«
&'
7'
$FW%WPIW.%
:HOO$WWULEXWHV
)LHOG1DPH
$/3,1(
:HOOERUH$3,8:,
:HOOERUH6WDWXV
352'
0D[$QJOH 0'
,QFO
0'IW.%
:(//1$0( :(//%25(
$QQRWDWLRQ
/DVW:2
(QG'DWH+6SSP'DWH&RPPHQW
66691,33/(
Last Tag
Annotation Depth (ftKB)End Date Wellbore Last Mod By
Last Tag:CD1-33 lmosbor
Last Rev Reason
Annotation End Date Wellbore Last Mod By
Rev Reason: Swap Gauges for Drilling pressure managment & Pulled &
replaced A-1
8/13/2021 CD1-33 claytg
Casing Strings
Casing Description
CONDUCTOR Insulated
42"
OD (in)
16
ID (in)
15.06
Top (ftKB)
38.0
Set Depth (ftKB)
114.0
Set Depth (TVD)…
114.0
Wt/Len (l…
62.58
Grade
H-40
Top Thread
WELDED
Casing Description
SURFACE
OD (in)
9 5/8
ID (in)
8.92
Top (ftKB)
36.8
Set Depth (ftKB)
2,376.7
Set Depth (TVD)…
2,375.8
Wt/Len (l…
36.00
Grade
J-55
Top Thread
BTC-MOD
Casing Description
PRODUCTION
OD (in)
7
ID (in)
6.28
Top (ftKB)
34.5
Set Depth (ftKB)
7,878.3
Set Depth (TVD)…
7,039.5
Wt/Len (l…
26.00
Grade
L-80
Top Thread
BTCM
Casing Description
OPEN HOLE
OD (in)
6 1/8
ID (in)Top (ftKB)
7,878.3
Set Depth (ftKB)
10,854.0
Set Depth (TVD)…
7,058.8
Wt/Len (l…Grade Top Thread
Tubing Strings
Tubing Description
TUBING
String Ma…
4 1/2
ID (in)
3.96
Top (ftKB)
32.3
Set Depth (ft…
7,654.3
Set Depth (TVD) (…
7,001.4
Wt (lb/ft)
12.60
Grade
L-80
Top Connection
IBTM
Completion Details
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°)Item Des Com
Nominal
ID (in)
32.332.30.07HANGER FMC TUBING HANGER 4.500
1,723.4 1,722.4 0.53 NIPPLE CAMCO 'DB' NIPPLE 3.812
7,597.0 6,981.3 66.49 PACKER BAKER S-3 PACKER 3.875
7,642.1 6,997.6 71.16 NIPPLE HES 'XN' NIPPLE 3.725
7,653.0 7,001.0 72.29 WLEG WIRELINE ENTRY GUIDE 3.875
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top
(ftKB)
Top
(TVD)
(ftKB)
Top Incl
(°)Des Com Run Date ID (in)SN
1,723.4 1,722.5 0.53 INJ VALVE 4.5" A- INJECTION VALVE ON 3.812" DB
LOCK
8/13/2021 0.000 HSS-162
7,642.1 6,997.6 71.16 GAUGES 4.5" KEYLESS XN LOCK w/ FLOWTHRU
SUB & SPARTEK GAUGES
8/13/2021 0.000
Notes: General & Safety
End Date Annotation
5/17/2009 NOTE: VIEW SCHEMATIC w/Alaska Schematic9.0
CD1-33, 8/25/2021 8:28:21 AM
Vertical schematic (actual)
OPEN HOLE; 7,878.3-10,854.0
PRODUCTION; 34.5-7,878.3
GAUGES; 7,642.1
PACKER; 7,597.0
SURFACE; 36.8-2,376.7
INJ VALVE; 1,723.4
NIPPLE; 1,723.4
CONDUCTOR Insulated 42";
38.0-114.0
WNS INJ
KB-Grd (ft)
42.56
Rig Release Date
1/5/2001
CD1-33
...
TD
Act Btm (ftKB)
10,854.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032035700
Wellbore Status
INJ
Max Angle & MD
Incl (°)
91.47
MD (ftKB)
10,802.99
WELLNAME WELLBORE
Annotation
Last WO:
End DateH2S (ppm)DateComment
SSSV: NIPPLE
•
MEMORANDUM • State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jap Regg DATE: Monday,June 19,2017
P.I.Supervisor ' "f 1 /(7 SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CD1-33
FROM: Bob Noble COLVILLE RIV UNIT CDI-33
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry J
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD1-33 API Well Number 50-103-20357-00-00 Inspector Name: Bob Noble
Permit Number: 200-212-0 Inspection Date: 6/10/2017 ✓
Insp Num: mitRCN170612084533
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD1-33 Type Inj W TVD 6981 "Tubing 2420 - 2420 " 2420 - 2420
PTD 2002120 Type Test SPT Test psi 1745 - IA 1130 3200 ' 3120 3110
BBL Pumped: 2 -BBL Returned: 1.6 - OA 790 810 810 - 810 "
Interval 4YRTST P/F P
Notes:
Monday,June 19,2017 Page I of 1
•
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Tuesday,October 08,2013
TO: Jim Regg
P.I.Supervisor e - I b6,�(15 SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CDl-33
FROM: Lou Grimaldi COLVILLE RIV UNIT CD1-33
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Suprv,c f
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD1-33 API Well Number 50-103-20357-00-00 Inspector Name: Lou Grimaldi
Permit Number: 200-212-0 Inspection Date: 1 0/5/2013
Insp Num: mitLG131005171724
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
PTD
2002120 • TYpe Test; G TVD 6981 IA 2050 zsoo 7 2770 2770 Well CDI 33 Type In'
Yp t SPT Test psi 1745 I OA 730 730 . 730 735
3450 3420 3420 3420 j
Interval 'WRIST P/F P Tubing
Notes: .5 bbl's diesel pumped and returned.Fluid in IA at surface.Good solid test.
SCANNED ;) r 2 3Z
Tuesday,October 08,2013 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Tuesday,June 18,2013
TO: Jim Regg r
P.I.Supervisor .(7 t ((Z-1 I l SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CDI-33
FROM: Jeff Turkington COLVILLE RIV UNIT CDI-33
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Suprvt=
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CDI-33 API Well Number 50-103-20357-00-00 Inspector Name: Jeff Turkington
Permit Number: 200-212-0 Inspection Date: 6/12/2013
Insp Num: mitJAT130614193417
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD1-33 'Type Inj N TVD 6981 IA 560 2000 1935 1920
PTD 2002120 Type Test,SPT Test psi 1745 OA 740 • 740 740 740
Interval 4YRTST P/F P Tubing 2620 2620 2825 2825 -
Notes: 1.0 bbl diesel to fill.
SCANNED FEB 2 6 2014
Tuesday,June 18,2013 Page 1 of 1
•
MEMORANDUM
To: Jim Regg ~ ~ ~Z
P.I. Supervisor ~~ ~ ~t~ 7
FROM: Bob Noble
Petroleum Inspector
•
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, June 22, 2009
SUBJECT: Mechanical Integrity Tests
CONOCOPHII.LIPS ALASKA INC
CDI-33
COLVII.LE RIV UNIT CDl-33
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
~~_
P.I. Suprv , ~
Comm
Well Name: COLVILLE RIV iTNIT CD1-33
Insp Num: mitRCN090617155636
Rel Insp Num: API Well Number: 50-103-20357-00-00
Permit Number: 200-212-0 ~ Inspector Name: Bob Noble
Inspection Date: 6/13/2009
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Wel~ CDl-33 Type Inj. G "j'~ 6981 jA 1600 3000 2950 2940
P.T.D 2002120 TypeTest SPT Test psi 3000 ,/ QA 775 600 990 790
Interval 4YRTST P~ P / Tubing 3633 3633 3633 3633
Notes:
Nli r1 •`tGS+
P,^~~;c~~~
t ~4~~;
;. * [ ~j[`~
~i ~ l~~.
.} ~a~4 rsr~ }- ~ ~ ~ . ., ~... . _ ..
Monday, June 22, 2009 Page 1 of 1
.
.
~
ConocoPhillips
Alaska
,\:J
c--'·;.;
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
March 31, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
5CANI~ED APR 1 0 2007
d.,Ðt.J -~, d-
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water nom entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~C
Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD# cement pumped cement date inhibitor sealant date
ft bbls ft gal
CD1-1 199-046 26" 0.3 6" 4/16/2003 3 2/17/2007
CD1-2 200-172 54" 0.6 5" 4/16/2003 2.7 2/17/2007
CD1-3 199-120 9'2" 1.4 14" 4/16/2003 6.5 2/17/2007
CD1-4 200-117 84" 1.0 9" 4/16/2003 4.3 2/17/2007
CD1-5 199-128 56" 0.6 30" 4/16/2003 14 2/17/2007
CD1-6 200-083 4" na 4" na 2 2/17/2007
CD1-8 204-059 6" na 6" na 8 2/17/2007
CD1-9 200-071 6" na 6" na 3 2/16/2007
CDHO 200-171 18" na 18" na 8.5 2/16/2007
CD1-12 204-205 4" na 4" na 2 3/8/2007
CD1-14 201-038 4" na 4" na 1 3/8/2007
CD1-16 199-094 14'7" 2.0 6" 4/16/2003 3 2/16/2007
CD1-17 200-145 8'9" 1.2 8" 4/16/2003 3.5 2/16/2007
CD1-18 204-206 4" na 4" na 1 3/8/2007
CD1-19 200-040 10" na 10" na 3 3/8/2007
CD1-20 204-240 6" na 6" na 2 3/8/2007
CD1-21 201-006 14' 1.8 8" 4/16/2003 3.7 2/16/2007
CD1-22 200-110 25" 0.3 4" 4/16/2003 1 3/8/2007
CD1-23 199-063 15' 2.1 8" 4/16/2003 3.7 2/16/2007
CD1-24 199-026 27" 0.3 6" 4/16/2003 2.8 2/16/2007
CD1-25 200-008 76" 0.8 18" 4/16/2003 8.4 2/16/2007
CD1-26 199-088 6" na 6" na 3 2/19/2007
CD1-27 200-006 16'8" 2.6 4" 4/16/2003 1.8 2/16/2007
CD1-28 200-199 6" na 6" na 3 2/16/2007
CD1-29 200-215 4" na 4" na 1.8 2/16/2007
CD1-30 200-132 9' 1.4 6" 4/16/2003 3 2/16/2007
CD1-31 200-118 6" na 6" na 3 2/19/2007
CD1-32 199-104 8'6" 1.2 5" 4/16/2003 2.3 2/16/2007
CD1-33 200-212 54" 0.6 10" 4/16/2003 4.7 2/16/2007
CD1-34 200-043 38' 5.7 8" 4/16/2003 3.7 2/16/2007
CD1-35 199-038 4" na 4" na 1 3/8/2007
CD1-36 199-112 15'10 2.3 8" 4/16/2003 3.7 2/16/2007
CD1-37 199-067 8" na 8" na 4 2/19/2007
CD1-38 200-003 48" 0.5 4" 4/16/2003 1.5 3/8/2007
CD1-39 199-080 4" na 4" na 1 3/8/2007
CD1-40 199-044 4" na 4" na 1.8 2/16/2007
CD1-41 200-017 12" na 12" na 5.6 2/16/2007
CD1-42 199-119 74" 0.8 6" 4/16/2003 2.8 2/16/2007
CD1-43 200-106 8" na 8" na 3.7 2/16/2007
CD1-44 200-055 10" na 10" na 4.7 2/16/2007
CD1-45 199-101 4" na 4" na 2 2/19/2007
CD1-46 204-024 36" na 36" na 16.9 2/16/2007
Alpine Field
March 31,2007
~.~~;.,
MICROFilMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
CIJI-- 3 3
(
Annular In¡ection Permit Required Documents:
~ 9-5/8" Casing Detail
~ 9-5/8" Cementing Details
rM' Daily Drilling Report from Surface casing cement job
, 9-5/8" Initial Casing Shoe Test
, 7" Casing Detail
ri 7" Cementing Details
r$ Daily Drilling Report from Intermediate casing cement job
rI Formation Adequacy for Annular Injection Test
5CANNEJ) JAN 1 3 2004
@r-D ~ Ð ,~
(
(
Casing Detail
9 5/8" Surface Casino
(
Well: CD1-33
Date: 12/25/00
( "'PHILLIPS Alaska, Inc.
A Subsidiary of PHILLIPS PETROLELM COMPANY DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to LDS 36.80
FMC Gen V Hanger 2.43 36.80
Jts 3 to 55 53 Jts 9-5/811 36# J-55 BTC Csg 2252.20 39.23
Davis Lynch Float Collar 1.56 2291 .43
Jts 1 to 2 2Jts 9-5/811 36# J-55 BTC Csg 81.99 2292.99
Davis Lynch Float Shoe 1.74 2374.98
2376.72
TD 12 1/411 Surface Hole 2386.00
RUN TOTAL 32 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - #12 (On stop rings of Jt #1 & #2)
#14,16,18,20,22,24,26,28,30,32,34,36,38,
) 40,42,44,46,48,50,52.
. 10 Jts left out #56 - #65
Use Best-a-Life 2000 pipe dope
Remarks: Up Wt -147k
Dn Wt -145k
Block Wt - 70
SupefVisor: David P. Burley
"
¡
(
~PHILLIPS Alaska, Inc.
~ A Subsidiary of PHILLIPS PETROLELM COMPANY
(:
CASING TALLY
WELL NUMBER:
TUBING DESCRIPTION:
DATE:
PAGE:
RIG:
1 of 2
Doyon 19
CD1-33
9 5/8", 36# L-80 BTC
12/25/00
ì
f
Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 8
No Feet No Feet No Feet No Feet No Feet No Feet No Feet No Feet
1 39.02 28 42.54 51 42 44 76 101 12(3 151 H6
------ -
2 42.97 27 42 99 52 42.94 77 102 127 152 177
3 43.52 28 41.7-6 53 I 42 56 78 103 128 1t>3 178
- 1--- -"--'- ~ -- - --..-. - - ..-- -- - .-----
4 37.83 29 4253 42 !::i4 7~ 104 12& 154 179
-- - -- - r---- - ---- .- -..
5 42.52 30 42.80 55 ! 43 01 80 105 130 15:) 180
--' ---- I --'----
6 43.09 31 42.30 55 42.64 81 1061 131 156 181
- - -' 1--:;1'- ----. -------
7 42.$4 ~~2 43. 15 57 42 21 82 107 132 ~') I 182
.-- -. -- .-=~'-I Úi:i" ----- - u-
8 41.71 33 42 78 58 4~:d~ ~3 IOH 1 ~~:~ 1 ~..:B
-- -- -1------_.. .- .- ---.- -- .-- -- --- -- --------
9 42.23 42.93 I .
$~ 59 4~ (;0 84 1091 134 159 184
:~¡¡¡:¡¡~M~9~¡¡~~~¡~¡ -------- - --. _-..n .n --- --- ..--
10 35 42.02 60 42A8 85 110 135 160 185
11 :¡¡~¡¡¡~¡i~~ii¡¡j~~ 36 i:i¡¡~¡II.~ili¡¡¡¡¡¡:¡¡ 61 ~ 86 111 136 161 186
12 I¡¡¡¡ai~~ij¡¡~¡¡¡¡¡ 37 42.41 62 42-:4ã 87 112 137 162 187
13 43.44 38 j¡¡¡~¡¡¡¡~I~li¡¡¡¡¡¡¡¡~¡ 63 ~ 88 113 138 163 188
14 ¡¡~¡i¡¡M:.g~f~¡¡¡¡¡¡¡¡¡ 39 42.71 64 42-:-7ð 89 114 139 164 189
15 42.82 40 ¡¡j¡¡I\¡I.~~¡¡¡¡¡¡¡¡¡¡ 65 ~ 90 115 140 165 190
16 m¡¡¡IMfiI~¡¡¡ 41 42.70 66 91 116 141 166 191
17 42.90 42 ¡¡j¡¡¡¡¡~¡¡I~ii¡¡¡¡¡¡¡¡¡¡ 67 92 117 142 167 192
18 ¡¡~¡~¡¡:iJ.~ii¡¡¡¡¡¡¡ 43 42_68 68 93 118 143 168 193
19 42.70 44 ¡¡¡¡¡¡¡¡¡¡jl@ii:¡¡¡:¡¡¡: 69 94 119 144 169 194
20 :¡¡¡¡¡~a.i~i~¡¡¡¡¡¡¡¡ 45 42.66 70 95 120 145 170 195
21 42.76 46 ¡¡¡~¡¡}ii~¡II¡I~¡ 71 96 121 146 171 196
22 ~¡~¡¡¡~¡jig~li¡¡¡¡¡¡¡ 47 42.92 72 97 122 147 172 197
23 42.98 48 ¡¡¡¡i¡~¡¡¡¡I~ii::¡¡¡¡¡¡i¡ 73 98 123 148 173 198
24 ¡¡¡¡i¡¡¡¡~}¡~i:~i¡:¡¡¡¡i 49 42.33 74 99 124 149 174 199
25 41.14 50 i¡i¡¡¡¡¡i¡¡iJ~¡i¡}¡¡¡1i 75 100 125 150 175 200
Tot 1057.11 Tot
1063.19 Tot
Tot
Tot
Tot
632.29 Tot
Tot
TOTAL LENGTH THIS PAGE =
2752.59
DIRECTIONS:
TOTAL JOINTS THIS PAGE = 65 FLOAT SHOE 1.74
FLOAT COLLAR 1.56
HANGER 2.43
RKB 36.15
(
(
Phillips Alaska Drilling
Cementing Details
Well Name: CD1-33 Report Date: 12/25/2000 Report Number: 3
Rig Name: Doyon 19 AFC No.: 998C18 Field: Alpine
Casing Size Hole Diameter: Angle thru KRU: Shoe Depth: LC Depth: % washout:
9.518 12.1/4 2377' 2291'
Centralizers State type used. intervals covered and spacing
Comments: 12.1/4" X 9.518" Bowsprlng centralizers 1 per Joint on #'s 1-12, (over stop rings on Jts. if. 1 & 2) over collars every other Joint from
32 Total Jts. #14 thru 52.
Mud Weight: PV(prior cond): PV(after cond): YP(prior cond): YP(after cond):
Comments: 9.8 15 14 40 15
Gels before: Gels after: Total Volume Circulated:
45/55/631 4/29/36 732 BBLS
Wash 0 Type: Volume: Weight:
Comments: 40 bbls 9.6 PPG
Marker wI nutplug
Spacer 0 Type: Volume: Weight:
Comments: ARCO B45 50 BBlS 10.5 PPG
lead Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield:
Comments: AS III lW 70 365 10.7 PPG 4.44
Additives:
30% D053. 0.6% D046. 1.5% D079, 1.5% SO01. 50% D124, 9% BWOW DO44
Tall Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield:
Comments: G 70 232 15.8 PPG 1.17
Additives:
0.2% D046. 0.3% D065. 1% SO01
Displaêement 0 Rate(before tail at shoe): Rate(tall around shoe): Str. WI. Up:
Comments: 10 BPM 10 BPM 147
Reciprocation length: Reciprocation speed: Str. WI. Down:
25 20 FPM 143
Theoretical Displacement: Actual Displacement: Str. WI. In mud:
177.1 BBlS 177 BBlS
Calculated top of cement: CP: Bumped plug: Floats held:
Returns to Surface Date:12/25/00 YES YES
Tlme:1442 hrs.
Remarks:Clrculated and conditioned mud at 9.5 BPM @ 520 psi, reciprocated casing untllliast 40 BBlS of displacement. Full returns while circulating and
cementing, had 57 bbls of 10.7 PPG cement returns to surface.
Cement Company: Rig Contractor: IApproved By:
Dowell DOYON I David P. Burley
,(
(
.~
Phillips Alaska Drilling
Daily Drilling Report
AFC No. Date RptNo Rig Accept - hrs Days Since AccepUEst: 2.4 / 2.3 Rig Retase - hrs:
998C18 12/2512000 3 12/231200001:30:00
PM
Well: CD1.33 Depth (MDfTVD) 2386/2385 Prey Depth MD: 2386 Progress: 0
Contractor. DOYON Daily Cost $ 334900 Cum Cost $ 569642 Est Cost To Date $ 540000
Rig Name: Doyon 19 Last Csg: 9-5/8" @ 2377' Next Csg: 7" @ 7874' Shoe Test:
Operation At 0600: Changing brake band on drawworks.
Upcoming Operations: MU BHA #2 and PU 5" drill pIpe. Test casIng, clean out cement, LOT, change over, drill ahead.
: MUD DATA DRILLING DATA BIT DATA EH&S DRILLS/BOP DATA
MUD TYPE De:PTH BIT NO. BIT NO. ACCIDENT (nen-splll) LAST BOP.DIVERT LAST BOP/DRILL
LSND 1 N TST 12/1712000
12/23/2000
WEIGHT ROT WT SIZE SIZE EMPLOYER LAST H2S DRILL LAST FIRE DRILL
9.6ppg 12.25 12/1412000
VISCOSITY PUWT MAKE MAKE SPILL LAST CONFINED LAST SPILL DRILL
48sqc HTC N SPACE 12/14/2000
12/05/2000
PVIYP SOWT TYPE TYPE TYPE . " ;>i ..,.;~
5/14 MXC1 .. ... .::. .:;. c"..;' "',"
GELS AVG DRAG SERIAL NO SERIAL NO VOLUME (gallons) FUEL USED 3821
6/10/12 L98DJ
APIWL MAX DRAG DEPTH OUT DEPTH OUT LAST SAFETY MTG DRILL WATER USED 700
8.2 10125/2000 - BBLS
HTHP WL TRO BTM DEPTH IN DEPTH IN ,. ' POTABLE WATER 95
ml130 min 116 INJECtiON USED - BBLS
SOLIDS TRO OFF FOOTAGE FOOTAGE INJECTION WELL . . WEATHER&.'.
6.0% 2270 CD1-44 . PERSONNEL DATA
HOLE VOLUME PUMP PRES ADT/AST ADT/AST SOURCE WELL TEMP of .10
146bbl III 13.75/4.38 / CD1.33
MBT PUMP NO WOB2 WOB2 RATE (bpm) WIND SPEED 2
12.5 11211 20-30 - 3.5
ph LINER SZ RPM 1 RPM 1 PRESSURE (psi) WIND DIRECTION 70.
10 5.51611 90 - 245 - 1200
LGS SPM 1 TFA TFA INJECTION FLUIDS CHILL FACTOR of .10.00
2.7% III .547
Water Base Muds
1502
PIT VOL GPM2 JETS JETS Cement PHILLIPS 1
300 III 1011211211811 IIIII 57 PERSONNEL
Other
241
DAILY MUD SPS 1 BIT COST BIT COST Diesel CONTRACTOR 26
$4491 III 20 PERSONNEL
0
TOTAL MUD SPP 1 DULL DULL TOTAL VOL (bbl) MISC PERSONNEL 5
$17290 III 2141WTIA III 1820
COMPANY MUDWT GRADE GRADE TOT FOR WELL (bbl) SERVICE 13
MI III E III ER 1 TD III 18058 PERSONNEL
TOTAL 45
~BI;ff.:ÐE$QRIR:rIQN, ,.,¡,:.~,..:~..:::,: c': I BIT/M1C@1.4/XO/NMPONY/NMSTAB/MWD/UBHO/2 NMDC/NMSTAB/NMDCIXO/3 HWDP/JARS/26 HWDP
. ,::, \:i~::,..i~'.' ::,~,:.:';;::~.(,::':'.~';ii\,~:';'.,'.:::~,'~::.:,':{':/..:;,..),:,»::,' .":.",DRll,L;pl.p"~QjD.TA?fX<,t\:.)i:?':"t:::.:;.t..';;¡,>'.:,~, ... :.:'>:,.';':',::::),'i.',;:<:::,:.:';i»:':.'
BHA NO 1 00,. . ,ID. WEIGHT GRAD~ C;ONNEC,TION .. CLASS 2 , LENGTH
BHA LENGTH 1078.78 5 4.281 19.5 G.105 4.1/2 IF
DATE LAST
INSPECTED:
HOURS ON JARS: 131.4
\):'TltilJE:~ ì"h'~:¿~EN[)<.. 'J .:' . .HOURS ". ..: OPS CODE I. , Ho.LE SECT JPHASE.OPS . I ..';.:';:, ,'~,:. ..;/;Qf!E;8ATIQN~FROM OOQO.':.OQOO.... .. ..
12:00 AM 12:30 AM 0.50 CIRC SURF Making Hole Monitor well, static, pump dry job.
12:30 AM 03:00 AM 2.50 TRIP_OUT SURF Making Hole POH, monitor well at hwdp. standback hwdp.
03:00 AM 05:00 AM 2.00 BHA SURF Making Hole LD BHA#1, clear tools from floor.
05:00 AM 11:00 AM 6.00 RUN_CSG SURF Casing and RU to run casing, PJSM. Ran 55 Jts. of 9.5/8" casing. MU
Cementing hanger and landing Joint.
11:00 AM 01 :00 PM 2.00 CIRC SURF Casing and Stage pumps up to 9.5 BPM. final pressure 520 psI. PJSM.
Cementing
01 :00 PM 03:00 PM 2.00 CLN_OUT SURF Casing and Test lines to 2500 psi, pumped 40 bbls of 9.6 ppg spacer
Cementing with nutplug for marker and 50 bbls of 10.5 ppg spacer.
Cemented casing with 365 sxs of lead and 232 sxs of tall
slurry. Displaced with 20 bbls FW and 157 bbls of mud,
plugs bumped, CIP @ 1442 hrs, had 57 bbls of 10.7 ppg
cement returns at surface. Flush and blow down surface
lines.
03:00 PM 04:30 PM 1.50 OTHER SURF Casing and LD cement head and LJ, MU wash tool and flush Dlvertor
Cementing and riser.
04:30 PM 08:30 PM 4.00 NU_ND SURF Casing and ND Dlvertor system, Install Unl.Head and test M/M seal s to
Cementing 1000 psi for 10 min.
08:30 PM 10:30 PM 2.00 NU_ND SURF Casing and NU bope.
Cementing
10:30 PM 12:00 AM 1.50 BOPE SURF Casing and RU and begin testing BOP's and choke manifold 250/3500
Cementing psI. John Spaulding (AOGCC) waived witnessing test.
Daily Drilling Report: CD1-33 12/25/2000
Page 1
CASING;
Well Name:
)T and FORMATION INTEGRITY TEST
---
CD1-33
12/26/00
Supervisor. D. Burley:
Date:
Reason(s) for test:
0 Initial Casing Shoe Test
0 Formation Adequacy for Annular Injection
0 Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Size and Description: 95/8" 36# J-55 BTC CSG
Casing Setting Depth:
Hole Depth:
2,406' TMD
2,405' TVD
2,377' TMD
2,376' TVD
Mud Weight:
9.6 ppg
29'
Length of Open Hole Section:
EMW=
=
Leak-off Press. + Mud Weight
0.052 x TVD
760 psi
0.052 x 2,376'
+ 9.6 ppg
EMW for open hole section = 15.8 ppg
Used cement unit
Ria DumD used
Pump output = 0.0997 bps
3,000 psi
2,800 psi
2,600 psi
2,400 psi
2,200 psi
2,000 psi
1,800 psi
w
~ 1,600 psi
CI)
~ 1 400 psi
t:t: '
Q. 1,200 psi
1,000 psi
800 psi
600 psi
400 psi
200 psi
0 psi
NO
#2
Fluid Pumped = 1.1 bbls
Fluid Bled Back = 0.9 bbls
- .-... u
~LEAK-OFF TEST
""-CASING TEST
--- LOT SHUT IN TIME
-:t;- CASING TEST SHUT IN TIME
-+- TIME UNE
0
10
30
STROKES
20
40
50
NOTE: STROKES TURN TO MINUTES DVRING "SHUT IN TIME":see time line above
Modified by Scott Reynolds
LEAK-OFF DATA
MINUTES
FOR
60
LOT STROKES PRESSURE
¡- --------- - -,--- - -- -- -- -_OJ ----- --_Of
: : 0 I 0 psi:
- --- -- ------ -- - -t----- --- - - ---+ --------- t
I I 1.0 I 0 psi:
;------------ - - -t ---- -------- -1----- ------ f
I I 2.0 I 50 psi:
:---- ---- ----1---- --- --- ---- -1- ----- - -- --- - -- f
; I 3.0 I 190 psi:
:- -- - --- -------~-- -- -- - - - ---- + - - ---- - ----~
! ! 4.0 ! 300 psi!
.. -- - --- ------- --,------- - - -----.,------ -- -------,
! ¡ 5.0 ! 390 psi ¡
.. - - - -- - -- --- ---.,----------- ---..--------- --- - --,
! ! 6.0 ! 490 psi!
.. - - - - - - - - -- - ----.,-------- ---..- ------- --- -- - ~
! ! 7.0 ! 560 psi!
.. - --- ---- ---- ---., ------- ..------------- -- -.
! ! 8.0 ! 630 psi!
I- - - - ----- - - -----.. - ----------------- - ------ ---.
i ! 9.0 i 680 psi!
1----- - - - --- -----..- --- --- ----------- -----&
! ! 10.0 i 720 psi!
1--- --- -- --- --- - -.. ------ -- ------....------- ---_&
, , I . ,
: : 11.0 : 760 pSI:
'----------------"---------------.L.---------------_&
, , , ,
, , , ,
, , , ,
----------------i---------------+----------------t
, . , ,
, , , ,
:--------------i---------------------------------t
I I , ,
I , I ,
:---------------~---------------I------ ---- -------f
, , I ,
, , , ,
----------------~----------------I-----------------f
, , , ,
, , , I
, I , ,
...-------------.,---------------..-----------------,
I , , ,
, I , ,
, , , I
..- -- - -- - -------,--- - - -- - --- - --..-- --- - -- - - - -- ----,
, I , ,
, I I ,
, I , ,
..---------------..--------------..-----------------'
I , I ,
, , , I
, I , ,
..---------------+-----------------------------.
, I , ,
, , , ,
, , I ,
..--------------..-- --- --------..------------- - --.
I , I ,
, , , I
, I , ,
1----------------""--------------""----------------&
, , , I
, , , I
, , , ,
'---------------...1- - - - - - - - - - - -I- - - - - - - - - - - . -,
, , , ,
, , , ,
1 , , ,
I I .
: SHUT IN TIME I SHUT IN PRESSURE
-- - - --- - --- --- -- i-- --- - - - - - ---- -,- ---- - -- -- ----- T
: 0.0 min : : 760 psi:
---------------~---------------------------------f
: 1.0 min : : 710 psi:
:----------------~----------------I-----------------f
: 2.0 min : : 660 psi:
----------------~----------------I-----------------f
1 30 " I 630 . I
; . mln I : pSI:
.. ----- ---- --- --.,- --- - - - ----- -- -..--- --- -- - - -- - ---,
i 4.0 min ¡ ¡ 600 psi ¡
..---------.,---------------..---------- -------,
! 5.0 min ! ! 580 psi!
..------.,---------------..----------------.
! 6.0 min ! ! 560 psi!
..-- - --------.. ---- ---- -- - --... -- ---- --- ---- --.
'70" '550.'
: .mln: : pSI:
1------ ----- - -..-- -- ------ - - -------- ----+
'80" '540 I'
: . mln : I ps:
t--------- --..- - ---------- ---....---- - -- ---+
'90" '530"
: . mln : : pSI:
1----- --- ---- - -"-- - - - - --- - -- -....--- ------ --- --_&
! 10.0 min ! ! 520 psi!
'---------------_..I_-------------_.J.._-------------~
8 '
" PHilliPS Alas«'a, Inc.
œ A Slbsidiary of PHILLIPS PETROlEL.t.1 COMPANY
CASING TEST DATA
MINUTES
FOR
CSG TEST STROKES PRESSURE
¡---------------i---------------i-----------------¡
: : 0 stks: 0 psi:
----------------t---------------t----------------1
!----------------¡--_¥..!S_~~!_--¡----~J.!~---~
~---------------¡---~_!5_~~!---¡--_¥.~~_P.!51_--i
: I 6 stks I 520 psi I
----------------~----- ----------~---------------I
: : 8 stks : 830 Psi:
----------------~--------------~-----------------I
i ! 10 stks i 1 ,030 psi!
,.---------------.---------------.,----------------.,
! ! 13 stks i 1,310 psi ¡
r---------------I---1!i-¡¡i-a(¡;--I--1-:!i1()-ittŠi-l~~
..- - ---- -- - - -- - --of - --- ---- ---. --- --- - -- - ---- -.
! ! 17 stks ! 1,740 psi,
1----------------+-------------"----------------+
L- --- - ---- - - - - - L~ -~-~~ _J. - ~ -'-~~~ p. !!j
i ! 21 stks ¡ 2,230 psi!
1------ --- ------_&_------------_&_------ ---------'
I , , . ,
I : 23 stks : 2,510 pSI:
'------------ ---- &_------------_¿_-- ----- ---------'
, , , I
, , , I
. , I I
------ ----- --- --I ------- ----- ---t- -- ------ -- - ----1
I I , 1
, I , I
:------ --- -------t ------- --- -- ---t- --------,. --- -- - 1
, , , ,
, I , 1
------ --- -- -----t------- ----- - -- f- - - - -- -- -- --- ----I
, , , I
, , , I
-- - -- -- - - ---- ---~------------- --~- - -- -- --- ---- ----I
, , I ,
, , I 1
, I I 1
.. ----- -------- --.,---- --- -- --- ---,------ ---- ------.,
1 , , ,
, , 1 1
, , 1 1
..- --- -----------. ------- --------.,--- --------- ----.,
I I , I
, , , ,
, 1 , I
,.-- -------------., ------------ ---.----------------...
I , , I
I 1 , I
, I , ,
, ,
I SHUT IN TIME: SHUT IN PRESSURE
r-õ~ö -m lñ - -- r - - -- - ---- ---- r- 2~Š- i õ -P- 51--!
1------ -- -- -- - - -- + - - -- --- - --- - --- + ---- - - -- - - -- ----...
, " '00 I'
: 1.0 mln : : 2,5 ps:
1..--------------"--------------- &_-- --------------'
'20" '2500"
: . mln : :, pSI:
,----------------¿--------------_&_----------------'
'30" '2500"
: . mln : :, PSI"-c'-
------- ----- ---t--- - -----------t ---------------
: 4.0 min : I 2,490 psi
----------------f ----------- -- --t----------------"1
I 5.0 min : : 2,490 psi:
:---------------f------------ - --t- -- --- ---- -------1
! 6.0 min ; : 2,490 psi:
,..---------- -- ---~--------------- f-----------------I
¡ 7.0 min ¡ ¡ 2,490 psi!
.. ---------------., ---------------.,----------------.,
i 8.0 min ! i 2,480 psi ¡
,.---------------.,---------------.,----------------.,
! 9.0 min ! i 2,480 psi!
..---------------.,---------------.,----------------...
! 10.0min ! ! 2,480 psi !
0----------------.---------------.----------------'"
, 150 . , I 2480 .,
: . minI :, pSI:
1---------------+---------------+-----------------0
i 20.0 min i ! 2,470 psi!
1----------------"------------ ---+----------------...
, 2 ., '4 0 i I
I 5.0 mln I I 2, 7 ps :
I..-------------~--------------_&_----------------'
! 30.0 min ! ! 2,460 psi!
,--------------_¿_--------______4____-------------'
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
. (
~PHILLIPS Alaska, Inc.
~ A Subsidiary of PHILLIPS PETROLEUM COMPANY
.1 '¡
Jt Number Num of Jts
Jts 3 to 192
190 Jts
Jts 1 to 2
2 Jts
-
ì
-
Casing Detail
7" Intermediate Casing
,c
,
\
Well: CD1-33
Date: 12/30/00
COMPLETE DESCRIPTION OF EQUIPMENT RUN
LENGTH
Doyon 19 AKB to LDS
FMC 1111 X 7" Hanger
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Collar
7" 26# L-80 BTCM Csg
7" Davis Lynch Float Shoe
34.45
2.05
7757.10
1.50
81.50
1.70
TO 8 1/2" hole
Top of Alpine @ 7790 ' MD.
1 straight blade centralizer per it. #1 - # 16
27 spiral centralizer (1) every other jt #137 - #189
Total - 43 centralizers
.
See.l.
0lJLrr'\ 0 O"Y\..
tÌ.n \If\l1' Do.O.nl'"<r~ 'It 0\
q FoVnd ~ ~ \\ FS ~ ~(.~hll
^ rl ~ \1~J.ed $ ~ r e Æ"11rl~ '-' J-o
1 þj,.~<'l '
Use Best-a-Life 2000 pipe dope
Remarks: Up Wt -250 k
On Wt -200 k
Supervisor: David P. Burley
DEPTH
TOPS
34.45
36.50
7793.60
7795.1 0
7876.60
7878.30
7888.00
(
~PHILLIPS Alaska, Inc.
~ A SUbsidiary of PHILLIPS PETROLEUvI COMPANY
\
WELL NUMBER:
TUBING DESCRIPTION:
DATE:
CD1-33
7", 26# L-80 BTCM
12/30/00
PAGE:
RIG:
(
1 of 2
Doyon 19
CASING TALLY
Column 1
No Feet
1 40 62 '
2 40.88
3 40.19
4 39.46
5 35 09
6 37.00
7 41 78
8 41 79
9 39.48
10 38.03
11 40.91
12 41.74
13 41 28
14 41 .70
15 41 37
16 41 76
17 .4208
18 4226
19
41.70
41.63
20
21
41.72
41.81
22
23
24
41.51
4181
25
.11 [¡.:;
Tot
1019.10 Tot
Column 2
No Feet
26
27
28
29
30
31
41.27
41 68
41 56
4154
41 ~2
41.53
4150
41 66
TOTAL LENGTH THIS PAGE =
32
33
34
35
36
41.53
4154
41 75
41.53
.11 78
Column 3
No Feet
51
52
5~~
54
41 60
41.38
41.65
41 28
4167
4166
Column 4
No Feet
76 41 89
77 3961
78 41.72
79 41 70
80 40.49
81 4 1 35
82 40 7';.
83 4 1 78
84
4 1 79
.
-,-
,~
41 15
1028.99 Tot 1018.77 Tot
Column 5
No Feet
101
3853
41 68
40 11
Column 6
No
126
121
128
Feet
40.21
3935
3870
Column 7
No Feet
151 41,92
152 40.11
153 49.54
154 40.55
155 40.09
156 4oJ.69
157
158
39.93
43.03
40.58
Column 8
No
176
177
178
Feet
41 81
41.71
4::: 41.
4074
37
38
39
40
111.68
41 b2
55
56
57
42.25
85
4 1. 5ö
102
103
10~
4001
4060
129
130
40.12
4011
3701
40 12
159
160
161
42.12
4::1.73
179
180
181
182
183
184
4j 47
39.'12
~J 7C
4Œ 14
,..~. ,..^
.:.:: ¿b
41
42
41.80
4 1 :~H
58
I, 1 79
85
3984
38.17
105
106
40 16
131
132
133
134
135
4 1 8<3
43.26
3823
162
42.14
41.21
185
186
37(;7
1..1 1 ~
~t :'~4
43
4101
'"'C~
......
41.51
41.66
4173
87
88
I1Q 11
107
39.6:]
135
3982
163
1~ì4
,'", ",'.' ,
..,:-: I ~':'
187
188
1B9
..... C')
.::: ... t-
.c 1 ßf.)
.
44
45
40.38
40.90
60
51
62
~1.78
89
3::': A:j
IOU
.10 if.
137
4'~ '17
1fif:
3::1 51
190
~1 ?ï
4ß
41. ßoG
63
3957
90
41 ." I
40 m~
Wi)
38 15
40 15
131:)
41 5{J
40, 1\)
166
41.67
41.63
191
1..:. 16
47
48
41 4,3
41 3J
64
¿;17H
91
92
42.22
40 1?
110
111
37.98
1 ~,4
14e
,...c '~'"
".,. 1-'..1
167
1ßö
41.67
192
1:1 4G
4[;
4~ B:¿
~;5
41 70
93
94
41 ßl
~ 12
1,0 i3
14 ~
142
40.W
41 55
1G9
41. ï'9 ,
40.'37
193
4;¿.: o~
C".r.
~.w
I¡ 1 ß6
un
111.71
41.69
95
96
40.68
41 7f:
1 1 :::
40 ~:9
14S
42 5;'
170
171
41.24
194
,~~-1 Ü
1037.80 Tot
67
Hé)
3~ 55
97
4':) 23
~ 14
3/8b
144
39.1~
172.
35.51
195
1..1... -+0
5B
38.53
98
4.:' 1 t:
115
116
4 1 ~~ ~:I
4051
145
146
41 OS
4098
39,2i
1'73
1ï"11
45.6~5
4C.22
4~ .51
196
H?ì
'198
199
2.JG
81 2 .60
DIRECTIONS:
TOT AL JOINTS THIS PAGE = 195 FLOAT SHOE 1.7
FLOAT COLLAR 1.5
HANGER 2.55
RKB 34.45
Joints 193 thru 195 stay out. (3 left in shed)
Shaded cells indicate positive standoff centralizer placement.
70
71
41.57
3917
7t.~
¿; 1.79
...,...
; ,')
3 D 30
",'"
,-
41.52
7961.84
::10
.....
"C -.-
~¡ .. . ~: :.:
iC']
..:: 1 t:
117
41.35
11 F.
119
3~: 6?
391ô
120
121
38.87
4061
122
4[' ?!
12~~
4.J m:
... .
!,'::. ;
.. ,..,.,
"" c...".
1 ;~:,,'
:~~) 11
1000.10 Tot
. II-'
"'t'l
~4B
~o ï~~
í.19
'~O "if..
.-..
: ~r.}
.128.\
1009.79 Tot
175
1034.69 Tot
('
(
Phlr
AI
k
D lr
c
f
D t 1
I IpS as a rl Ing ernen Ing e al S
Well Name: CD1-33 Report Date: 12/3112000 Report Number. 9
Rio Name: Doyon 19 þ,FC No.: 998C18 Reid: Alølne
Casing Size Hole Diameter. Angle thru KRU: Shoe Depth: LC Depth: % washout:
7" 8.5" 7878 7794
Centralizers State type used, intervals covered and spacing
Comments: 1 Straight blade centralizer on Joints "s 1-16 and 1 spiral centralizer on every other Joint "s 137-189.
43 total
Mud Weight: PV(prior con d): PV(after cond): YP(prior cond): YP(after cond):
Comments: 9.7 PPG 13 14 21 17
Gels before: Gets after. Total Volume Circulated:
12115117 8110/12 720 BBlS
Wash 0 Type: Volume: Weight:,
Comments: ARCO Wash 20 BBlS 8.4 PPG
Spacer 0 Type: Volume: Weight:
Comments: ARCO 845 50 BBlS 12.5 PPG
Lead Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield:
Comments:
Additives:
Tall Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield:
Comments: G 70 130 15.8 1.15
Additives:
0.2% D046, 0.25% D065, 0.25% D800 and 0.18% D167.
Displacement 0 Rate(before tail at shoe): Rate(tail around shoe): Str. WI. Up:
Comments: 7.5 BPM 8BPM 250
Reciprocation length: Reciprocation speed: Str. WI. Down:
30' 25 FPM 200
Theoretical Displacement: Actual Displacement: Str. WI. in mud:
298.4 BBLS 296.2 BBlS
Calculated top of cement: CP: Bumped plug: Floats held:
7290' WI 40"10 excess In open hole Date:12/31/oo YES YES
Tlme:0426 hrs
Remarks:Clrculated and conditioned mud @ 7.5 bpm final pressure 870 psi. Reciprocated pipe untllliast 15 bbls of displacement, full returns throughout.
Cement Company: Rig Contractor: Approved By:
Dowell DOYON David P. Burley
(
(
Phillips' Alaska Drilling
Daily Drilling Report
\
I
AFC No. I Date Apt No I Rig Ac:c8pt . hIS Days Sln08 AcoeptlEat 8.4 I U
988C18 12/31/2000 9 12J23J2000 01 :30:00 PM Rig Rei... - hIS:
Well: CD1-83 Depth (t.fD/'TVD) 78&817040 Prev Depth t.fD: 788ð
PIog IUS: 0
Contrador: DOYON Daily Coat $ 277042 Cum Ooat $1558709 Est Cost To Dale $ 1655474
Rill Name: Down 19 Lasl Csg: .,. 0 7818' Next C8Q: Nt A Shoe Test
Operatio~ AI 0600: Tn"" _1110 to 3SOO pal.
Upc:omin" Operations: Clean ovI ceme~1. AT. chan"e OV8r \g Flo-Pro mud and drill produdion hole.
MUD DATA DRlWNG DATA 8fT )ATA EH&S ORiLlSI8OP DATA
MUD~ DI!P'TH elT NO. elT NO. ACOIDI!NT (non-spill) LAST eoP/DIVel'lT ~T LAST eol-/DRILL
LSNO " N 1 2/3112000 12/2812000
WEIGHT ROTWT SIZE SIZE EMPLO'r'ER LAST HZS DRILL LAST FIRE DRILL
8.8ÞPQ 6.125 12/27/2000
VISCOSITY PUWT MAKE MAKE SALL LAST CONFINED SPACE LAST SPILL DRILL
46sqc STC N 12I0512OOO 12/2912000
fNf'(f!1 sowr TYÆ TYÆ TYÆ FUel. WATER
10 (19 M20SPX
GELS Ava DRAG SERIAL NO SERIAL NO VOLUME (gallens) FUEL USED 4111
8(10113 JS3898
API WI. MAXOflAG DEPTH OUT DEPTH OUT LAST SAFETY t.fTG DRILL WATER USED. 500
4.0 1013112000 BBLS
HTHPWL TRQ BTM DEPTH IN DEPTH IN POTABLE WATER USED. 90
12mlf3O mln 788ð INJEC1l0N BBLS
SOUDS TRQ OFF FOOTAGE FOOTAGE INJECTION WELL WEATHER.
7.5% 0 CD1-44 PERSONNel DATA
HOLE VOLUME PUMP PRES ADT/AST ADT/AST SOURCE WELL TEMP 'F .16
298bbl III I ( CD1~
MBT PUMP NO WOB2 WOB2 flATE (bpm) WIND SPEED 14
20 11211 . . 3.5
ph UNERSZ RPM1 RPM1 PRESSURE (psi) WIND DIRECTlON 40'
8.5 5.51811 ' . 1300
LCS SPM1 TFA TFA INJECT10N FLUIDS CHILL FACTOR 'F -50.61
4.1% III 0.690
Weier &sø Muds
1200
PIT VOL GPM2 JETS JETS Other PHILUPS PERSONNEL 1
III 1511511511511 11111 80
120 Diesel
50
DAJLYMUD SPS1 BIT COST BIT COST CONTRACTOR 21
30140130140 0 PERSONNEL
$26501
0
TOTAL MUD SPP1 DULL DULL TOTAL VOL (bbl) MISC PERSONNEL 5
III III III 1330
$114164
COMPANY MUDWT GRADE GRADE TOT FOR WELL (bbl) SERVICE PERSONNEL 13
hi' III III III U~\19
TOTAL 46
BHA DESCRIPTION I glT{!1U;TAQI"'1XO1.2INt.CGTAQlNUPONYn.AWDlPWMN~DP/1 I-IWDP/JARIõI4 .IWD;1
ORilLPlPE DATA
¡w.. NO 4 OD 10 WEIGHT GRADE OONNEO'nON OI..ASS 2 LENGTH
BHA LENGTH 383.38 5 4.281 19.5 0.105 4-112 IF
DATE LAST INSPECTED:
HOURS ON JARS:
11ME I . END I HOURS OPS CODE I HOlE$ECT .1 PHASE OPS I OPERATIONS FROM 0000 . 0000
12:00AM 12:30 AM 0.50 RUN_CSG P1 Casing and Cementing Run 7" casing. MU LJ and establish clrc.
12:30 AM 01:45 AM 1.25 ClRC P1 Casing and Cementing Stage pumps up 10 1.5 bpm and condition mud.
01:45AM 02:15 AM 0.50 OTHER P1 CasIng and Cementing Lay down fill-up tool and MU cement head.
02:15AM 02:45 AM 0.50 ClRC P1 Casing and Cementing Continue circulating hole clean. PJSM.
02:45 AM 0iI:3O AM 1.75 Ct.fT - CSG P1 Casing and Cementing Test lines \g 3400 psi. pump 20 bbls of wash and 50 bbls of 12.5 ppg
spacer. Cemented casing wi1h 130 sxs of tail slurry. dilpla.ced wi1h 20
bbls PW and 275.6 bbls of mud. Plugs bumped. floa.ts held. ClP@ 0426
hrs.
0iI:3O AM 06:30 AM 2.00 OTHER P1 Casing and Cementing AD cement head. LO landing joint and remove running tools from floor.
06:90 AM 07:80 AM 1.00 TEST P1 Casing and Cemenllng Pull wear sleeve. instaJl and test packoff 10 5000 psi. 10 min.
07:30 AM 10:00 AM 2.50 BOPE P1 Casing and Cementing Change lop pipe rams 10 3-112" ( 6" and change 11> saver sub \g 3-112" IF.
10:00 AM 04:00 PM 6.00 BOPE P1 Cuing and Cementing Test BOPE " choke and surfac:e safety valves 10 250( 3500 psI. Lay down
le91 plug and Install wear bushing.
04:00 PM 0&:00 PM 2.00 BHA PROD Making Hole MU B.A 14.
06:00 PM 12:00 AM 6.00 TRIP_IN PROD Making Hole RIH picking up 3-112" drill pipe from sheef.
24.00
Supervisor: DAVID P. BURLEY
Daily Drilling Report: CD1-33 12/31/2000
Page 1
CASING -¡,
T and FORMATION INTEGRITY TEST
Well Name:
CD1-33
Date:
12/31/00
Supervisor: D. Burley
Reason(s) for test:
0 Initial Casing Shoe Test
0 Formation Adequacy for Annular Injection
0 Deep Test: Open Hole Adequacy for Higher Mud Weight
Casing Setting Depth:
Casing Size and Description: 95/8" 36# J-55 BTC X 7" 26# L-80 BTMC
Hole Depth:
TOC
7,290' TMD
6,798' TVD
2,377' TMD
2,376' TVD
Mud Weight:
9.7 ppg
Length of Open Hole Section:
+ 9.7 ppg
4,913'
Leak-off Press. + Mud Weight = 820 psi
0.052xTVD 0.052 x 2,376'
EMW for open hole section @9
EMW=
Pump output = bbls pumped
Ai
UJOOpsi
900 psi
800 psi
700 psi
6CO psi
w
D::
=> 500 psi
In
In
W
D::
D..
400 psi
300 psi
200 psi
100 psi
5
10
BARRELS
Fluid Pumped = 11.5 bbls
Fluid Bled Back = 0.0 bbls
TIMELlNE;.;..:.:...
ONE',Mïf:'Juie JiëKS:. .
~ LEAK-OFF TEST
~CASING TEST
--- LOT SHUT IN TIME
~ CASING TEST SHUT IN TIME
-+- TIME LINE
"'"1"-~
15
20
NOTE: STROKES TURN TO MINUTES DURING IISHUT IN TIME":see time line above
Modified by Scott Reynolds
LEAK-OFF DATA
MINUTES
FOR
LOT
BBLS
PRESSURE
r----- -- - -----ï- - - --- ---- ----¡- ---- - -- - - -: - - ---j
I I 0 : 0 pSI:
'- -- --- -- ------ - .1-- -- --- - -- - --.L.- -- -- ----- -- -- --.I
, , 1 . I
: I 0.5 : 15 pSI I
;- --- -- --- - -- - ---i --- - ----- - - ----+ - - - -- --- - -- - -- - -t
: I 1.0 : 30 psi:
;-- - - - -- - - - - - --- - i --- ------ - -----i-- --- - ------ - -- - - f
: I 1.5 I 85 psi I
:----------------~--------------~-----------------f
: : 2.0 I 197 psi I
I-------------~---------------I-----------------f
! ! 2.5 ! 295 psi!
r-------------,---------------""----------------'
! ! 3.0 ! 419 psi!
r- ------ -- - - -- --,-- ---- ---.,..-- - - -- --- - ----- -.
! i 3.5 i 510 psi i
.... - --- - - ---- - ---.. --------- -- - -...-- -- -- ----- -- -- -.
! ! 4.0 i 601 psi ¡
.... -- - -- - - - -- --.. ------- ---- - - of- ------------- - - -.
! ! 4.5 ! 686 psi!
1------ ----- - --<t-- ---- --- --- -....---- -- ---- ---- -.I
1 1 5 0 '177 . ,
: :.: pSI:
to ------ - -- - - -- .1-- ---- - ----- -....----------- -.I
1 1 5 '"IÞ't . 1
: :.5 I 0,,0 pSI:
L. -- - -- -- -- -----' - --- - -- -- ---- - -.L. -- -- - - -- --------.1
, , 1 . I
: : 6.0 : 750 pSI:
'----------------.l--------------.L.------------.I
, , 1 . ,
I : 6.5 : 700 pSI I
;- - --- - -- - ----i - -- - -- - --- --+---- ---- - t
: : 7.0 I 670 psi:
:--- - -- --- - -- - ---~ --- - - - - ---- - -~-- ------- f
: : 7.5 I 590 psi:
:--- ------ - ----~-- --- - -----~--- ------ - f
: I 8.0 : 586 psi:
:-- - - ----- - -- --- -.f-- --- - - ------1------------- f
¡ ! 8.5 ! 591 psi ¡
r - - - -- - - - - - ----, - -- -- -- - ----,--------- -- ----- -,
! ! 9.0 ¡ 576 psi!
r - -- - - --- -----,---- ----------.,..----- ----------,
: : 9.5 : 565 Psi:
, 1 , 1
r --- - -- - - -- ----,------....- ------------.
! ! 10.0 ! 560 psi!
r - -- - - - - - --- --..------- - -~ ---- ---- - - ----.
! ! 10.5 ! 540 psi ¡
.. - -- --- - - - ------ --- ------ --- --....- -- - ---- -- - - ----.
! ! 11.0 ! :540 psi!
L.---------------"-------------. - - - - - - - - - - --,
! ! 11.5 ¡ 545 psi!
-----------
25
, I
: SHUT IN TIME: SHUT IN PRESSURE
'------------.1 -- - --- - -- - - - -- -- - ------ -----
, 0 0 . I , 545 . ,
I . mln : : pSI:
¡-------;- ---1--- --- - - - - -- - -1---- ----:--1
, 1.0 mln , 1 343 PSI,
;-- ------------ i - -- --- - -- -- -- ~- - ----- - -- --of
: 2.0 min : : 328 psi:
:-------------~----------------I---------------4
: 3.0 min I : 315 psi:
:------- ----- ~-- - - -- - - - -- - - - -I- - -- - -- ---- ----- f
! 4.0 min ¡ ! 303 psi!
.----- - -- --- ---, -- -- - - -- -- -- - - -.,.. -- - ---- ---- - -- --,
! 5.0 min i i 293 psi ¡
r- ----------- ---.. -- - - - -- - - - --- --.,..- - -- -- ----- -- - -.
'60" '283"
: .mln: : pSI:
r------------"---------------""---------------.
'70" '270"
: .mln: : pSI:
r---- ---- - --- ---.. -- - - - -- --- - - - -of----- --------- - - -.
'80" '258"
: .mlnl : pSI:
to--------------"-------- -------+ ---------------.
'90" '247"
I .mlnl : pSI:
1---------------"---------------""----------------'
! 10.0 min i ! 242 psi ¡
L. ---------------..---------- -----....---- ------------.1
fa .
" PHilliPS AlaSl\á, Inc.
A Slbsldia1y of PHILLIPS PETROLELM COMPANY
CASING TEST DATA
MINUTES
FOR
CSG TEST STROKES PRESSURE
¡---------------¡--------------¡-----------------¡
: I 0 stks: 0 psi :
'----------------.1-- - -- -- ------ --..---- ----- -------.1
1 , , ,
1 , ,
, , , ,
:--------------- -t----- -- - -- -----t -------- ---- ----1
1 I I I
, 1 I I
:- -------------- - t--- -- ----------t------ --- ----- - --I
, I , ,
1 I ,
1--------- ---- --- t---- ----------- t--- --- - -- --- -----I
, 1 , I
, 1 1 ,
I---------------t---------------t-----------------I
, 1 , ,
, 1 I 1
, 1 , ,
...---- -----------.,-- -------------,--------------- -.,
, 1 , 1
, 1 , 1
, 1 , ,
,..- --------------.,------ ---------.,----- ---- ---- ---.,
: : : --
, , 1
r----------------"---- -- ---------.---- ----- ----_.
, 1 I
, , ,
I , I
r-------------- --+--- ----- ----- --+------------- ---of
I I , ,
, , I ,
, 1 I ,
t----------------+- --- ----- ------+----------------of
I 1 1
I , 1 1
, , I 1
'---------------- +--- ------------+---------------- of
1 , 1 ,
, I 1 ,
, , 1 ,
'-------------- -- .1--------------_£ --------- ------_.&
1 , 1 ,
1 , 1 ,
1 I 1 ,
1..---------------" ----- ----------..-------- -- ------.1
1 I , I
, , , ,
, 1 , I
:----------------t---------------t----------------1
1 1 , ,
, , , 1
:----------------t---------------t----------------1
, , , 1
I , ,
I----------------t------------ -- -t----- ----- -------1
1 , , ,
1 I 1 ,
I---------------t-------------- -t- --- -- -----------1
1 I I 1
1 , I ,
I , I ,
r- --------------.,---------------., ----------------.,
1 , 1 ,
1 I 1 ,
1 , 1 ,
r--------------,---------------'----------------"
, , 1 ,
1 , I 1
, , , ,
, ,
I SHUT IN TIME I SHUT IN PRESSURE
r-- ---- ----- - ----+ --- ---- - -- - ----.. - -- -- - ----- -- -- --,
, 00 ., 1 0 . I
: . mln : : pSI:
t- ---------------+--- ------- ----+----------------of
! 1.0 min ! ! !
L.---------------+--- --- - - -- -----+-------- -- ------...
! 2.0min ! ! !
L.---------------.I---------------+----------------'"
! 3.0 min ! ¡--""
'- ----------- ----..---- --- -------_.&_---------- --.
¡ 4.0min ! i
:----------------t---- -----------t----------- -----1
: 5.0min : : :
:------------- ---t------ ---------t------ ----- - -- ---I
: 6.0min : : :
1------------- - - -t - ---------- ----t----------- ---- --I
: 7.0min : : :
I----------------t---------------t-----------------I
! 8.0min ! ! i
,..---------------,---------------,----------- -- ---.,
¡ 9.0min ! ! !
,..---------------,---------------.,----------- -- ---.,
¡ 10.0 min ¡ ! !
r--------------+ --- ------------, ---------- - -- -- -.,
¡ 15.0 min ! ¡ ¡
r----------------+---------------+----------------of
! 20.0 min ¡ ¡ ¡
t-- --------------+----- ----- -- -- - .--- -- ------ -- - -- of
¡ 25.0 min ¡ ¡ !
'---------------- +------------ ---+ ----------- -- - --...
! 30.0 min ¡ ! !
L.------- - --- - ---.1- -- - --- - - - -- ---.I - - - -- - - - -- - - -- - _.&
NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY
Permit to Drill 2002120
MD 10854 ~ TVD
DATA SUBMITTAL COMPLIANCE REPORT
1116/2003
Well Name/No. COLVILLE RIV UNIT CDI-33 Operator CONOCOPHILLIPS ALASKA INC
7059 ... Completion Dat 1/5/2001 /" Completion Statu WAGIN Current Status WAGIN
APl No. 50-103-20357-00-00
UIC Y ~
REQUIRED INFORMATION
Mud Log N__.~o Sample N._.~o
Directional Survey ~_~..~___:~__ .: ....
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
Lo ~ Injection Profile
Lo _CC~,C,,esing collar Iocator
Lo ~-~'~"l'~Perature
Lo
~ma Ray
Lo
L
L
C
R
L
L
R
Log Log Run
Name Scale Media No
(data taken from Logs Portion of Master Well Data Maint
Interval
Start Stop
OH I Dataset
CH Received Number Comments
MD Array Res
TVD Array Res
9931
Directional Survey
CBL
Injection Profile
Directional Survey
1 Blu
1 Blu
1 Blu
1 Blu
1
2/5
2/5
Blu
1 7750 9900
1 7750 9900
1 7750 9900
I 7750 9900
2.~10854
1 7750 9900
FI NAL 2386 10854
FI NAL 2388 10854
FINAL 2386 10854
FINAL
FINAL 7420 7720
FINAL 7800 7920
FINAL
Case 6/21/2002
Case 6/21/2002
Case 6/21/2002
Case 6/21/2002
Open 2/26/2001
Case 6/21/2002
oh 2/26/2001
oh 2/26/2001
oh 2/26/2001
2/22/2001
ch 3/16/2001
ch 6/1/2001
oh 9/24/2001
09931 2386-10854
2386-10854 BL, Sepia
2386-10854 BL, Sepia
2386-10854 Digital Data
Dir Survey Paper Copy
7420-7720 Color Print
7800-7920 BL, Sepia
Directional Survey
Well Cores/Samples Information:
Name
Start
Interval
Stop
Sent Received
Dataset
Number Comments
ADDITIONAL INFORMATION
Well Cored? Y/~
Chips Received? ~
Analysis Y.J-N.--.-
R ~.r~.iv~.rl?
Daily History Received?
Formation Tops
Permit to Drill 2002120
MD 10854 TVD
DATA SUBMITTAL COMPLIANCE REPORT
1/1612003
Well Name/No. COLVILLE RIV UNIT CD1-33
Operator CONOCOPHILLIPS ALASKA INC
7059 Completion Dat 1/5/2001
Completion Statu WAGIN
Current Status WAGIN
APl No. 50-103-20357-00-00
UIC Y
Comments:
Compliance Reviewed By:
Date:
O6/12/O2
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
NO. 2154
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
Color
Well Job # Log Description Date BL Sepia Prints CD
CD1-33 ~l~l-~l,;). ;INJECTION SURVEY 05/16/02 1
CD1-40 [ ~ c~--O'./cl :FLOWING TEMP/PRESS SURVEY 05/19/02 1
CD1-45 JcICj.../O~ INJECTION SURVEY-WARMBACKS 05/19/02 I
RECEIVED
~('~ DATE: ,, ,~,, r~ ~ r)t~"~O
SIGNED: I ,,JL.;i"4 /._ !, /...gu'-
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907)561
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest' Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1t74
Company:-
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
.333 west 7th Ave, Suite t00
Anchorage, AK 99501
Field: -AlPine
(Open Hole)
Color
Well Job # Log Description Date BL Sepia Prints CD
CD1-33 INJECTION PROFILE 05/1310t t 1
CD1-14 21225 USIT 0412710t 1
.
.
.
.
.
·
"'
.-.
~, ~./ .^~: JUN 0 1 2001
Aladm 0il & Gas Cons. CmmTdseion
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 661-8317, Tha~l~l~8
5/3012001
Scklumberger
Schlumberger Technology Corporation, by and through is Geoquest Division '
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1076 .
.Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
(Cased Hole)
_.
Color
Well Job # Log Description Date BL Sepia Prints CD
CD1-02~Db-1"T=.~ 21103 SCMT 02/07101 I -
CD1-33~0~i1,,~ 21104 SCMT 02/08101 1
CD1-26 IC~..D~'~ 21116 RST WATERFLOW LOG 03/03/01 I 1
WD-02 21117 TEMP BASELINE & WARMBACK ' 03101/01 1- 1
WD-02 21117 RST WATERFLOW LOG 03102/01 I 1
WD-02 21117 INJECTION PROFILE/RST 03102/01 ' I 1
I V
3/14/01
NadmOil&GasC0ns.~
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907)561-83!7. Than~ -
PHILLIPS Alaska, Inc.
A Subsidiary of PHILLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage, Alaska 99510-0360
G. Alvord
Phone (907) 265-6120
Fax: (907) 265-6224
March 2, 2001
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Completion Report for CD1-33 (200-212)
Dear Mr. Commissioner:
Phillips Alaska, Inc. submits the attached Completion Report for the drilling operations on the
Alpine well CD 1-33.
If you have any questions regarding this matter, please contact me at 265-6120 or Scott Reynolds at
265-6253.
Sincerely,
G. C. Alvord
Alpine Drilling Team Leader
PA1 Drilling
GCA/skad
RECEIVED
MAP, 06 2.001
Alaska 0ii & Gas Cons. Commission
~0h0tag0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of well Classification of Service Well
Oil D Gas [~ Suspended [~ Abandoned D service [~ WAG injector
2. Name of Operator ..... ~ ;'-'*=, 7. Permit Number
Phillips Alaska, Inc. ! LOCATIC~4.,S
v[~_~, _~'~ 200-212
3. Address_~U. ~--.~ 8. APl Number
P. O. Box 100360, Anchorage, AK 99510-0360 ..... 50-103-20357-00
4. Location of well at surface ~ 9. Unit or Lease Name
452' FNL, 2349' FWL, Sec. 5, T11 N, R5E, UM (ASP: 385774, 5975679) - -...-- Colville River Unit
At Top Producing Interval , .... _.. 10. Well Number
1947' FNL, 1049' FWL, Sec. 5, T11 N, R5E, UM (ASP: 384454, 5974203) ' _.j'_...5.--_..~j_ CD1-33
At Total Depth :' '.';-.;":r" - ' " 11. Field and Pool
682' FSL, 2475' FWL, Sec. 5, T11 N, RSE, UM (ASP: 885846, 5971484) ; ..... ~,~.~_ ...... " Colville River Field
5. Elevation in feet (indicate KB, DF, etc.) is. Lease Designation and Serial No. ' ........................... ~ Alpine Oil Pool
RKB 87 feetJ ADL 25559 / ALK 872095
12. Date Spudded 18. Date T.D. Reached 14. Date Comp., Susp. Or Aband. J15. Water Depth, if offshore 18. No. of Completions
December 23, 2000 January 3, 2001 January 5, 2001 J N/A feet MSL 1
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey ~20. Depth where SSSV set 21. Thickness of Permafrost
10854' MD / 7059' TVD 10854' MD / 7059' TVD YES r~ No DI N/A feetUD 1557'
22. Type Electric or Other Logs Run
GR/Res
23. CASING, LINER AND CEMENTING RECORD
SEYI-ING DEPTH MD J
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED
16" 62.5# H-40 Surface 114' 42" lO cu yds Portland Type 3
9.625" 36# J-55 Surface 2377' 12.25" 365 sx AS III LW & 232 sx Class G
7" 26# L-80 Surface 7878' 8.5" 13o sx Class G
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4.5" 7653' 7597'
Open Hole completion 6.125" OH from 7888'-10854' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
N/A
27. PRODUCTION TEST Jr""'r'~J [',) t J~' ~ I~.! J[ I~
Date First Production Method of Operation (Flowing, gas lift, etc.) ~'J J \ J ~J ~ J ~ J~ L
N/A Injector
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAS-OIL RATIO
I
N/A Test Period >
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF tNATER-BBL OIL GRAVITY - APl (corr)
press, psi 24-Hour Rate >
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
.,^ RECEIVED
MAR 0 6 2001
Alaska 0ii & Gas Cons. Commission
Anchorage
·
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate
29. ~.. 30. ~-
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity.
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Alpine D 7763' 7027'
Alpine 7798' 7034'
N/A
31. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Scott Reynolds 265-6253
Signed ~ "~., {~ Title Alpine Dri inR Team Leader Date -~/~-(O {
~/ ~ G. C. Alvord
Prepared by Sharon AIIsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1' Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21' Indicate whether from ground level (GL)or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Operations Summary CD1-33
Rpt No Comments
12/23/00 Move out Ball Mill and split Rig modules. Move rig from well CD1-28 to CD133. Move in Pits
and Motors, spot GIS.
12/23/00 Nu Divertor system, take on mud in pits. Accepted rig @ 13:30 hours.
12/23/00 Ready floor for BHA, service TD and drawworks, take on mud in pits.
1 2/23/00
12/23/00
1 2/23/00
12/23/00
1 2/23/00
12/24/00
1 2/24/00
1 2/24/00
12/24/00
1 2/25/00
1 2/25/00
12/25/00
1 2/25/00
12/25/00
12/25/00
12/25/00
12/25/00
12/25/00
12/25/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
12/26/00
1 2/27/00
12/27/00
MU BHA #1.
Held Pre-Spud Meeting with Rig Team.
Performed Divertor Test, John Crisp (AOGCC) waived witnessing test.
Fill Conductor and pressure test mud lines and standpipe to 2500 psi.
Drill from 116' to 300', surveying with Gyro. ART=0.85 AST=0.79
Drill from 300' to 2386'. ART=9.37 ASR=4.38
Pump sweep around and circ clean, monitor well.
Wipe hole to 1459', max overpull 35k. RIH, no problems.
Circ and condition mud.
Monitor well, static, pump dry job.
POH, monitor well at hwdp, standback hwdp.
LD BHA #1, clear tools from floor.
RU to run casing. PJSM. Ran 55 jts. of 9-5/8" casing. MU hanger and landing joint.
Stage pumps up to 9.5 BPM, final pressure 520 psi. PJSM.
Test lines to 2500 psi, pumped 40 bbls of 9.6 ppg spacer with nutplug for marker and 50 bbls
of 10.5 ppg spacer. Cemented casing with 365 sxs of lead and 232 sxs of tail slurry. Displaced
with 20 bbls FW and 157 bbls of mud, plugs bumped, CIP @ 1442 hrs,
LD cement head and LJ, MU wash tool and flush Divertor and riser.
ND Divertor system, install Uni-Head and test M/M seal s to 1000 psi for 10 min.
NU bope.
RU and begin testing BOP's and choke manifold 250/3500 psi. John Spaulding (AOGCC)
waived witnessing test.
Test BOPE, choke manifold and surface safety valves 250/3500 psi, annular 250/2500 psi.
Install wear bushing.
Slip and cut drilling line.
Change out off-drillers side brake band on drawworks.
Service drawworks and top drive.
MU BHA #2, shallow test tools.
PU 30 Jts of DP and RIH to 2266'.
Wash down from 2266' to 2277', circ out cement contaminated mud, Blow down TD.
RU and test 9-5/8" casing to 2500 psi for 30 min.'
Drill out cement and float equipment - made 20' of new hole to 2406'.
Circ hole clean.
RU and perform LOT - established 15.8 ppg EMW.
Displaced hole with new 9.6 ppg LSND mud.
Drill from 2406' to 3215'. ART=4.1 AST=0
Drill from 3215' to 4783'. ART=4.94 AST=2.56
Pump high vis sweep and circ hole clean. Monitor well, static.
12/27/00 Wiped hole to shoe, no problems. RIH, precautionary wash last 90' to bottom.
12/27/00 Drill from 4783' to 6020'. ART=5.16 AST--1.35
12/28/00 Drill from 6020' to 6945'. ART=5.18 AST=0.67
Operations Summary CD1-33 ~.
12/28/00 Pumped high vis sweep and circ hole clean. Monitor well, static, blow dn. TD.
12/28/00 POH, no problems. Monitor well @ shoe & hwdp, static.
12/28/00 Standback hwdp and DC's, laid down tools. MU BHA #3, shallow test @ 1070'.
12/28/00 RIH, no problems, precautionary wash down last 90'.
12/28/00 Drill from 6945' to 7138'. ART=0.6 AST=2.6
12/29/00 Drill from 7138' to 7888'. ART=3.6 AST=10.2
12/29/00 Pump high/Iow/high vis sweeps and circ hole clean.
12/29/00 Pump out to 7630', continue POH to 6779', no problems. RIH, precautionary wash last 60' to
bottom.
12/29/00
12/30/00
1 2/30/00
12/30/00
1 2/30/00
12/30/00
12/30/00
12/30/00
12/30/00
12/30/00
12/30/00
12/30/00
12/30/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
12/31/00
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
Pump high vis sweep, circ and cond mud.
Circ and cond mud, monitor well, static.
Pump out to 7443', POH. Monitor well at shoe and hwdp, no problems.
Set back hwdp, lay down BHA, clear tools from floor.
Pull long wear bushing, flush wellhead and BOP stack with wash tool, install wear sleeve.
RU to run 7" casing, held PJSM with crew.
Run casing to 2350', cup on fill-up tool failed.
Lay down fill tool and blow down TD, RU circ swedge and hose.
Circ and cond mud, repaired Fill-up tool.
RD circ equipment - MU fill-up tool.
PJSM w/crew. Run 7" casing to 5546'.
CBU @5 BPM , 450 PSI. R E C E IV E D
Run 7" casing.
Run 7" casing, MU LJ and establish circ.
Stage pumps up to 7.5 bpm and condition mud. MAR 0 6 Z001
Lay down fill-up tool and MU cement head.
Continue circulating hole clean, PJSM. Alaska 0il & l]as Cons. Commission
Aj~ch0rag.e .
Test lines to 3400 psi, pump 20 bbls of wash and 50 bbls of 12.5 ppg spacer. L;ememeo
casing with 130 sxs of tail slurry, displaced with 20 bbls FW and 275.6 bbls of mud. Plugs
bumped, floats held, CIP @ 0426 hrs.
RD cement head, LD landing joint and remove running tools from floor.
Pull wear sleeve, install and test packoff to 5000 psi, 10 min.
Change top pipe rams to 3-1/2" x 6" and change TD saver sub to 3-1/2" IF.
Test BOPE - choke and surface safety valves to 250/3500 psi. Lay down test plug and install
wear bushing.
MU BHA #4.
RIH picking up 3-1/2" drill pipe from shed.
RIH picking up drill pipe to 6649'.
Slip and cut drilling line, service drawworks and top Drive.
RIH to 7656'.
Clean out cement stringers from 7656' to 7708', and med hard cement from 7708' to 7779'.
Circ and condition mud.
RU and test casing to 3500 psi for 30 min. Blow down lines and RD circ head.
Drill out float equipment, cement and 20' of new hole to 7908'. Found FC and FS 14' high,
adjusted shoe depth to 7864'.
Circ and condition mud.
RU and perform LOT - established EMW of 11.9 ppg. Blow down lines and RD circ head.
Operations Summary CD1-33 {'-"
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/1/01
1/2/01
1/3/01
1/3/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/4/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
1/5/01
PJSM. Change well over to 9.2 ppg FIo-Pro mud - clean possum belly and shaker pans.
Attemp to survey - unable. Troubleshoot MWD
Pump out 5 stands and POH.
Handle BHA - change out MWD. MU BHA #5 and shallow test tools.
RIH to 7886' - establish circ and survey.
Drill from 7908' to 7978'. ART=0.8 AST=0
Drill from 7978' to 9382'. ART=12.5 AST=4.1
Drill 6 1/8" hole f/9382' to 10854'-7058 TVD
Circ Iow/high vis sweeps - circ and condition prep for change over
Continue circ Iow/hi vis sweeps - circ & clean pit 6 & trip tank - Take on 9.2 ppg brine - mix hi
vis spacer
Cahnge well over to 9.2 ppg brine - 4.5 bbls/m @ 1690 psi
Monitor well - hole taking 108 bbls/hr - spot 40 bbls hi vis pill @ 10854'
Pull out to 9572' - hole taking 30 bbls/hr.
Spot 40 bbls hi vis pill @ 9572'
Continue pull out to 7861'(into 7" csg) monitor well - hole taking < 10bbls/hr
Pump dry job - blow down top drive
Continue pull out std back 45 stds 3 1/2" DP - L/D 201 jts. 3 1/2" DP
Flush BHA w/40 bbls flesh water - blow down TD
L/D 6 1/8" BHA
Pull wear bushing
Rig up to run 4 1/2" completion
PJSM - M/U WLEG -Pup it.- XN nipple - 1 jt. tbg - Baker S-3 packer -(3) 4 1/2" pups jts - RIH
w/4 1/2" 12.6# L-80 IBTM tbg - Ran 138 jts.- Install Camco DB nipple - RIH w/40 jts. 4 1/2"
12.6# L-80 IBTM tbg - M/U FMC tbg hanger
M/U tbg hanger - land tbg - Test tbg hanger seals to 5000 psi - WLEG @ 7654 - Packer @
7597
Rig down tongs - clean rig floor
Change upper pipe rams to41/2" x 7" - change SS in TD - N/D BOPE - N/U Tree - test to 5000
psi - pull 2 way ck
Rig up circ manifold and lines for displacement
PJSM - Displace well w/105 bbls 9.6 ppg Inhab. brine followed by 153 bbls diesel @ 2.5
bbl/min @ 1100 psi
N/U short lubicator to tree - drop RHC packer setting ball & rod - attempt to pressure up to set
packer - ball didn't seat into RHC profile
R/U slick Iline- PJSM - Test wireline BOP to 3500 psi
RIH w/blind box on slick line to attempt to push ball & rod to RHC profile - observed slight
bobble @ 7450' - ran on in to top of XN nipple - pressure up to 1000 psi - appears ball seated
into RCH profile - POOH w/slick line & tools into wireline lubica
Pressure up on tbg to set packer w/3500 psi & hold for 30 mins. lost 230 psi in 30 mins -
switch line & test 4 1/2 x 7 annulus to 3500 psi for 30 mins. ok - Pressure test witnessed and
approved by Lou Grimaldi AOGCC
Bleed off lines - rig down slick line - rig down circ manifold
R/U lubicator & set BVP-
Secure well - release rig
RECEIVED
MAR 06 2001
Alaska 0ii & Gas Cons, Commissl0n
Anchorage
- -~:_::: ;..::? :..-i .?~!'AtgPINE:-'"f-{:' CD 1~q3'-': :'i-~- '~; ..... ('-"---'-'~:-: :'Alaska State:'Plan&~i'-'-.-"-t; :' i ~- :' '..: --J:. -'." ~: _~'-:':; ~_::r~.VSect:.. Pl~'n~:'~ 2
:;:"' ;-:i ;"';~: ~,~'~d''-': ~:;'~'~i~,:~.i.;':';1;.'.,~i~'~i::('fvi~-~e:.~:'!;i -rg~.J [.'i-.'.?:~: xi ~;i-;.[~::. :-':-:i-::-" Yi=;i~-.--'-..--) !: ~ N :~ ,~i'~' ii':~i
51 5195.00 33.83 235.37 5050.52 4994.52 385280.86 5975313.98 -372.40 -487.24 1.78
52 5386,00 33.46 234,99 5209,52 5153,52 385193,06 5975254.92 -432,82 -574,11 0.22
53 5480.01 33.57 236.09 5287,91 5231.91 385149,82 5975226,22 -462,19 -616,91 0.66
54 5672.00 33,41 235,02 5448,02 5392.02 385061.54 5975167,68 -522,11 -704,27 0.32
55 5862,00 32,98 235,11 5607.02 5551,02 384975.35 5975109,45 -581,67 -789,55 0,23
56 5958,00 32,47 234,94 5687,78 5631,78 384932,37 5975080.37 -611.42 -832.08 0.54
57 6051,00 31,77 237,48 5766.55 5710.55 384890.87 5975053,51 -638.93 -873.16 1,64
58 6243.00 31.39 235.42 5930.12 5874,12 384806.24 5974999.27 -694,48 -956.95 0.60
59 6432.00 31.54 236,01 6091.33 6035,33 384723,88 5974944.97 -750,05 -1038,46 0,18
60 6624 31.8 236.39 6254.74 6198,74 384639,26 5974890,21 -806,13 -1122,23 0,17
61 6718 31,92 237,62 6334,58 6278,58 384597.23 5974863,85 -833,15 -1163,84 0,7
62 6814 31,42 236,88' 6416.28 6360,28 384554.42 5974837,25 -860,41 -1206,23 0,66
63 6882 31,55 237,62 6474,27 6418,27 384524,26 5974818,5 -879,62 -1236,1 0,6
64 6906 32,11 237,8 6494,66 6438.66 384513,46 5974811,91 -886,38 -1246.8 2,37
65 6937 32,09 238,93 6520,92 6464,92 384499,3 5974803,49 -895,02 -1260,83 1,94
66 6968 32,49 234,01 6547,13 6491,13 384485,37 5974794,56 -904,17 -1274,62 8,57
67 7001 33,85 230,83 6574,76 6518,76 384470.9 5974783,77 -915,18 -1288,92 6,69
68 7035 35,6 225,83 6602,7 6546.7 384456,26 5974771,12 -928,06 -1303,36 9,83
69 7061,99 36,96 223,05 6624,46 6568,46 384444,91 5974759,89 -939,47 -1314,54 7,91
70 7094 38,27 219,12 6649,82 6593,82 384431,86 5974745,37 -954,19 -1327.36 8.54
71 7123 39,27 215,16 6672,44 6616,44 384420.68 5974731,07 -968.67 -1338,32 9,22
72 7158 40,38 209,4. 6699.32 6643.32 384408,44 5974712,32 -987,61 -1350.26 11
73 7189 41.09 203,85 6722.82 6666,82 384399,11 5974694.39 -1005.68 -1359.32 11.9
74 7224 41,46 199,47 6749.13 6693,13 384390,27 5974673,08 -1027,13 -1367,83 8,32
75 7256 42,14 194.7 6772,99 6716,99 384383,69 5974652,8 -1047,5 -1374,09 '10,16
76 7283,02 43,05 191,42 6792,89 6736,89 384379,29 5974635,06 -1065,31 -1378,21 8,88
77 7319 44,81 186,76 6818,8 6762,8 384374,98 5974610,49 -1089,95 -1382,14 10,23
78 7351 46,13 182,66 6841,25 6785,25 384372,77 5974587,8 -1112.68 -1384 10,02
79 7383 47,52 177,56 6863,15 6807,15 384372,37 5974564.48 -1136 -1384,04 12,41
80 7415 49.71 174,24 6884,31 6828,31 384373,73 5974540,52 -1159,94 -1382,31 10.36
81 7446 52,16 172,29 6903,85 6847,85 384376,18 5974516,58 -1183,84 -1379,48 9,29
82 7478 54,72 171,27 6922,91 6866,91 384379,47 5974491,09 -1209,27 -1375,8 8,4
83 7510' 57,95 169,82 6940,64 6884,64 384383,44 5974464,77 -1235,54 -1371,42 10,77
84 7541 60,73 168,54 6956.45 6900,45 384388,04 5974438,5 -1261,73 -1366,41 9,65
85 7572 63,99 167,05 6970,83 6914,83 384393,43 5974411,58 -1288,5.6 -1360.6 11.35
86 7604 67,19 165,33 6984,05 6928,05 384399.95 5974383.19 -1316.85 -1353,64 11,13
87 7635 70,43 163.77 6995,26 6939,26 384407.22 5974355,22 -1344.71 -1345.94 11.46
88 7667 73,73 162.71 7005.1 6949,1 384415.54 5974325.94 -1373,85 -1337,16 10,78
89 7698 76,09 161.64 7013.17 6957,17 384424,26 5974297,32 -1402,35 -1327,99 8,31
90 7731 76,96 162,86 7020,86 6964,86 384433,57 5974266,61 -1432,91 -1318,21 4,46
91 7759 79,11 160,61 7026,67 6970,67 384441.75 5974240,47 -1458.92 -1309,63 10,99
92 7792,01 81,95 158,77 7032,1 6976,1 384452,57 5974209,77 -1489,45 -1298,32 10,21
93 7820 84,57 158,27 7035,38 6979,38 384462,34 5974183,75 -1515,31 -1288,15 9,53
94 7888 87 154 7040,38 6984,38 384488,81 5974121,34 -1577,31 -1260,71 7,21
95 >>>Projected to TD
96
97
98
99
100
: :" .'-~' t:":': ': !:'
· _ .~ .. :-.:.- -...
· ve~:'-s~
-.-.._:.;_~-?:.::
594.80
696.18
745.82
847.10
946.82
996.58
1043.68
1139.33
1233.57
1329.62
1376.67
1424.4
1458.04
1469.99
1485.49
1501.23
1518.75
1537.82
1553,71
1573.22
1591.36
1613.62
1633.4
1655.48
1675.32
1691.83
1713.55
1732.49
1750.75
1768.41
1785.34
1802.95
1820.78
1838.15
1855,52
1873.32
1890.32
1907.66
1924.24
1942.06
1957.06
1973.91
1987.81
2019.23
': ::-' .: :.---~'-.:' :.ALPINE-'_'--?CD1-3~: ~:?.~ :' ::-: ':~ ': '. Alaska state Plane: :.!:::. · :- .:-" -':' ::: ": - .-.:::.¥.$ect'~ plan· ~.~15i~85:.:'.:.::-~':;..'
$.vy#!:: De~t.h':'. :i~.': :' d~9..:.':!:.:.:!::.'.':deg:.~:i.!:.-:':-! :.:~t:::':..-"?-:!'.:subsea:::: .-"~ ~: .ff..=:-: :': i :.....:_.'! ftli.' ~.:_'._'-" :_ ft. =-:_':.':
101 8403.00 89.79 152.69 7043.46 6987.46 384720.58 5973661.55 -2033.48 -1021.80
102 8498.00 89.97 152.40 7043.66 6987.66 384763.06 5973576.58 -2117.78 -978.00
103 8593.00 88.94 152.32 7044.57 6988.57 384805.81 5973491.76 -2201.94 -933.93
104 8685.00 89.69 151.16 7045.67 6989.67 384848.10 5973410.08 -2282.96 -890.37
105 8779.00 90.17 151.46 7045.78 6989.78 384891.94 5973326.93 -2365.42 -845.25
106 8870.00 90.62 153.91 7045.15 6989.15 384932.42 5973245.45 -2446.27 -803.49
107 8964.00 89.01 151.47 7045.46 6989.46 384974.24 5973161.29 -2529.78 -760.37
108 9056.00 89.97 152.61 7046.28 6990.28 385016.10 5973079.38 -2611.04 -717,24
109 9149.00 87.77 154.56 7048.11 6992.11 385056.16 5972995.49 -2694.30 -675.88
110 9240.00 87.70 151.73 7051.71 6995.71 385095.96 5972913.75 -2775.41 -634.81
111 9331.00 88.11 154.21 7055.04 6999.04 385136.01 5972832.13 -2856.41 -593.48
112 9425.00 88.32 153.90 7057.96 7001.96 385175.80 5972747.02 -2940.90 -552.38
113 9517.00 89.59 152.76 7059.64 7003.64 385215.80 5972664.20 -3023.09 -511.09
114 9611.00 90.17 154.49 7059.84 7003.84 385256.24 5972579.36 -3107.31 -469.33
115 9703.00 89.28 150.54 7060.28 7004.28' 385297.41 5972497.11 -3188.90 -426.88
116 9794.00 90.24 152.74 7060.66 7004.66 385339.38 5972416.39 -3268.98 -383.66
117 9886.00 89.07 150.26 7061.21. 7005.21 385382.00 5972334.88 -3349.82 -339.77
118 9978.00 89.55 149.61 7062.32 7006.32' 385426.84 5972254.56 -3429.43 -293.68
119 10070.00 89.90 152.02 7062.76 7006.76' 385470.44. 5972173.57 -3509.75 -248.82
120 10163.00 90.24 151.94 7062.65 7006.65 385512.85 5972090.81 -3591.85 -205.13
121 10254.00 90.72 149.33 7061.89 7005.89 385556,22 5972010.83 -3671.14 -160.51
122 10344.00 89.14 150.63 7062.00 7006.00 385600.03 5971932.23 -3749.07 -115.49
123 10436.00 89.59 149.84 7063.02 7007.02 385644.45 5971851.67 -3828.92 -69.82
124 10530.00 90.00 151.30 7063.35 7007.35 385689.35 5971769.11 -3910.79 -23.63
125 10620.00 90.41 150.86 7063.03 7007.03 385731.64 5971689.67 -3989.57 19.89
126 10713.00 90.93 150.64 7061.94 7005.94 385775.81 5971607.84 -4070.70 65.33
127 10803.00 91.47 148.87 7060.06 7004.06 385819.91 5971529.43 -4148.43 110.65
** 10854.00 91.47 148.87 7058.75 7002.75 385845.58 5971485.38 -4192.07 137.01
1.75 1310.89
0.36 1405.88
1.09 1500.87
1.50 1592.86
0.60 1686.86
2.74 1777.84
3.11 1871.82
1.62 1963.81
3.16 2056.74
3.11 2147.64
2.76 2238.55
0.40 2332.44
1.85 2424.39
1.94 2518.34
4.40 2610.31
2.64 2701.30
2.98 2793.29
0.88 2885.23
2.65 2977.21
0.38 3070.21
2.92 3161.18
2.27 3251.12
0.99 3343.08
1.61 3437.05
0.67 3527.04
0.61 3620.02
2.06 3709.94
0.00 3760.85
Scklumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 923
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Alpine
(Open Hole)
1/29/01
Color
Well Job # Log Description Date BL Sepia Prints CD
CD1-33 21034 M10,1MP & CDR LWD (PDC) 010104 1
~1-33 21034 MD ARRAY RES (PDC) 010104 1 1
CD1-33 21034 TVD ARRAY RES (PDC) 010104 I 1
CD1-229 PB1 21035 ADN & CDR LWD (PDC) 010116 1
CD1-229 PB1 21035 MD ADN (PDC) 010116 I 1
CD1-229 PB1 21035 TVD ADN (PDC) 010116 I 1
CD1-229 PB1 21035 MD CDR (PDC) 010116 I 1
CD1-229 PB1 21035 TVD CDR (PDC) 010116 I I
SIGNE~
DATE: ~~..~ '"'01
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
MWDILWD Log Product Delivery
Customer Phillips Alaska Inc. Dispatched To: AOGCC
Well No CD1-33 Date Dispatche 19-Jan-01
Installation/Rig Doyen 19 Dispatched By: Nate Rose
LOG Run No. Scale Original Film No Of Prints No of Floppies No of Tapes
~urveys (Paper) ,,~(3b-~l~ 2
~° = !11
- -' I::7
~.
Received By: Please sign and return to:
Anadrill LWD Division
3940 Arctic Blvd, Suite 300
Anchorage, Alaska 99503
nrosel @slb.com
Fax: 907-561-8417
LWD Log Delivery V1.1, Dec '97
Alpine CD1-33 Permit
Subject: Alpine CDI-33 Permit
Date: Mon, 18 Dec 2000 16:10:26 -1000
From: "Vernon T Johnson" <VJOHNSOl@ppco.com>
To: tom_maunder@admin.state.ak, us
Tom,
We are currently ahead of schedule on Doyon 19 (drilling CD1-28) and could be
spudding CD1-33 as soon as Friday night. We applied for the permit last week
and I wanted to give you a heads up on the rig timing, due to the upcoming
Christmas holidays. If you have any questions please contact me at this email
address, or the numbers below.
Vern Johnson
265-6081 (wk)
242-8157 (cell)
267-0566 (pager)
I of 1 12/19/00 7:52 AM
~J C¡'-r' r' ~'-~;:¡ ~E /~';"\. ~". r.~\ ["'¡ . r- t;;ì æ... rì ji
(L " ^ I ( . ~ ¡ , / ,\ \ ,¡ i 1\\ \ (Ll 1\ \ (; ,
'L\ .J ¡ Ii! 1/\1, II if \ ~ lJ 'J'
~) 1- if~ II L l \0) L! U\i L L, LFJ ~ } . IÆ I TONY KNOWLES, GOVERNOR
/
r
f
ALASKA OILA5D GAS I 3001 PORCUPINE DRIVE
CONSERVATION COMMISSION II ~~~~~~~~7~'2~~~4~~ 99501-3192
Chip Alvord FAX, (907) 276-7542
Drilling Team Leader
Phillips Alaska, Inc.
POBox 100360
Anchorage, AK 99510-0360
Re: Colville River Unit CDI-33
Phillips Alaska, Inc.
Permit No: 200-212
Sur Loc: 452"FNL, 2349"FWL, Sec. 5, TIIN, R5E, UM
Btmhole Loc. 639~FSL, 2484~FEL, Sec. 5, Tl1N, R5E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Colville River Unit
Well No. CDI-33. Please note that any disposal of fluids generated from this drilling operation which are
pumped down the surface/production casing annulus of a well approved for annular disposal on the CD 1
pad must comply with the requirements and limitations of 20 AAC 25.080. Approval of this permit to
drill does not authorize disposal of drilling waste in a volume greater than 35,000 barrels through the
annular space of a single well or to use that well for disposal purposes for a period longer than one year.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the
mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC
25.030(g)(3).Sufficient notice (approximately 24 hours) of the MI test before operation, and of the
BOPE test performed before drilling below the surface casing shoe, ,must be given so that a representative
of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum
field inspector on the North Slope pager at 659-3607.
aniel T. Seamount, J r.
Commissioner
BY ORDER OF THE COMM.ISSION
DA TED this 2- I .s..:z:-- day of December, 2000
,
d1fÆnclosures
cc: Department 'of Fish & Game, Habitat Section w/o encl.
Department of Environmenta] Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of Work Drill X Redrill ~ lb Type of Well Exploratory Stratigraphic Test Development Oil
Re-Entry Deepen! Service X Development Gas Single Zone X Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Phillips Alaska, Inc. DF 56' feet Colville River Field
3. Address 6. Prope~.~s_ignation Alpine Oil Pool
P. O. Box 100360, Anchorage, AK 99510-0360 .~31~a~JS'5'8 / ADL 25559
4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025)
452' FNL, 2349' FWL, Sec.5, T11 N, R5E, UM Colville River Unit Statewide
At target .~wT~casing point) 8. Well number Number
2020' F~'I_; 1095' FWL, Sec. 5, T11 N, R5E, UM CD1-33 #59-52-180
At total depth 9. Approximate spud date Amount
639' FSL, 2484' FWL, Sec. 5, T11 N, R5E, UM 12/24/00 $200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
Property line Alpine CD1- 34 10,854' MD
639' FSL T11N R5E feet 9.9' @ 200' Feet 2560 7,056' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2))
Kickoff depth 3500' feet Maximum hole angle 90.39° Maximum sudase 2484 psig At total depth (TVD) 3167 at psig
7000'
'I'VD.SS
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed
12.25" 9.625" 36# J-55 BTC 2364' 37' 37' 2401' 2400' 476 Sx Arctic set III L &
230 Sx Class G
8.5" 7" 26# L-80 BTC-M 7847' 37' 37' 7884' 7046' 109 Sx Class G
N/A 4.5" 12.6# L-80 I BT-M 7546' 32' 32' 7578' 6970' Tubing (packer depth)
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length ~~ ~ ~/~(~ented Measured depth True Vertical depth
Structural
Conductor
Surface
Intermediate DEC 1 ~ ?nnl)
Production
Liner
true measured vertical Naska 0il, Gas Cons. Commission Anchorage"" '-- I~') '" I GiNAj'~ ~. .... .
Perforation depth:
20. Attachments Filing fee X Property plat BOP Sketch Diverter Sketch Drilling program X
Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ ~ {~ Title Drilling Team Leader Date (~[(L{ ,,
/ '~' Commission Use Only
Permit Number~.Z:~- ~7.../Z. I APl number
50- /'C:)~ ,~.Z~"7- ~ I Appr°valdate/~.-.,~,"~/-'' ~;:~(~'') ISeec°verletterf°r
- Other requirements
Conditions of approval Samples required Yes ~ Mud Icg required Yes ~
Hydrogen sulfide measures ~ No Directional survey required ~ No
Required
working
pressure
for
BOPE
2M 3M ~.5M.) 10M 15M
Approved by D TaYlor Seamount Commissioner the commission
Form 1'0-401 Rev. 7-24-89
Submit in triplicate
Alpine: CD1-33
Procedure
(
1. Install diverter. Move on Doyon 19. Function test diverter.
.
3.
4.
5.
6.
7.
8.
.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Drill 12 1/4 inch hole to the surface casing point as per the directional plan.
Run and cement 9 5/8 surface casing.
Install and test BOPE to 3500 psi.
Pressure test casing to 2500 psi.
Drill out 20' of new hole. Perform leak off test.
Drill 8-1/2" hole to the intermediate casing point in the Alpine Reservoir.
Run and cement 7 inch casing as per program. Top of cement 500 feet above Alpine reservoir as per Rule
20 AC 25.030. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure
referenced to the casing shoe. Freeze protect casing annulus and casing.
BOPE test to 3500 psi.
Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5
ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW.
Drill 6 1/8" horizontal section to well TD.
Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore
having moved out of the Alpine reservoir sand).
Displace well to brine and pull out of hole.
Run 4 ½, 12.6 #., L-80 tubing with and production packer. Land hanger.
Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
Circulate tubing to diesel and install freeze protection in the annulus.
Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins.
Set BPV and secure well. Move rig off.
RECEIVED
DEC
Naska 0il & Gas Cons. Commissio~
Anchorage
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD1-34 will be the closest well to CD1-33 (9.9' at 200' MD). Accounting for survey
tool inaccuracies, the ellipse separation between these wells will be 8.2' at 200' MD.
Drillin.q Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated.
Lost circulation: There is some potential for lost circulation in the Alpine sand do to faulting. If losses are
encountered, conventional LCM treatments will be used.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular Pumping Operations:
Incidental fluids developed from drilling operations on well CD1-33 will be injected into the annulus of a
permitted well on the CD1 pad.
The CD1-33 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
We request that CD1-33 be permitted for annular pumping of fluids occurring as a result of drilling
operations, per regulation 20 AAC 25.080. As stated above, any zones containing significant hydrocarbons
will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or
potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional
drilling plan for other formation markers in this well.
Surface casing will be set at the base of the Schrader Bluff Formation (C-30). These 450-500' thick shales
are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg)* (0.052)* (Surf. Shoe TVD). 1,500 psi RECEIVED
-- (12.0 ppg) * (0.052) * (2400') + 1,500 psi
- 2,998 psi
Pore Pressure = 1,086 psi DEC -[ ~ ~00~]
Alaska 0ti & Gas Cons. Commission
Therefore Differential = 2998 - 1086 = 1912 psi. Anchorage
The internal 'casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 27992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 47599 psi 7,240 psi 6,154 psi
CD1-33
DRILLING FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 ~" Section - 6 1/8"
point- 12 ~,
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.2 ppg
PV 10 - 25 10 -15
YP 20 - 60 15 - 25 25 - 30
Funnel Viscosity 100 - 200
Initial Gels 4 - 8 10 - 15
10 minute gels <18 12 - 20
APl Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 min (drilling)
HPHT Fluid Loss at 160 12 - 14 cc/30 rain
PH 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5
KCL 6 %
Surface Hole:
A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline
viscosity at +_ 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain
mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel / polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section:
The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of
6% KCI, with _+ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer
and DuaI-FIo starch will be used for viscosity and fluid loss control respectively.
CD1-33
/
~, 16" Conductor to 114'
/
/~ 4a; 11/72';00, amTvcD°=D1BToNiP, PIM~ (3'812" ' D)
@ 2401' MD / 2400' TVD
cemented to surface
( ;olville River Field ~'"
Injection Well Completion Plan
Updated 12/11/00
A1 Injection Valve (2.125"1D) - to
be installed later
4-1/2" 12.6 ppf L-80 IBT Mod. R_~3
tubing run with Jet lube pipe dope
Packer Fluid mix:
9.6 ode KCl Brine
with 2000' TVD diesel cap
Tubing Supended with
diesel
TOC @ +/- 7278' ME
(+500' MD above top
Alpine)
Top Alpine at 7778' MD /
7033' TVD
Completion
MD TVD
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, IBT-Mod Tubing
Camco DB Nipple 1701' 1700'
4-1/2", 12.6#/ft, IBT-Mod Tubing
S3 Packer (c/w handling pups) 7578' 6970'
4-1/2" tubing joint (1) R2
HES "XN" (3.725" ID) - 68 deg 7635' 6993'
4-1/2" 10' pup joint
WEG - 69 deg 7645' 6996'
Baker S3 Packer at +/- 7578' (<200' MD above to top Alpine)
Well TD at
10854' MD /
7056' TVD
7" 26 ppf L-80 BTC Mod
Production Casing @ 7884' MD / 7046' TVD @ 87 deg
i' Colville River Field
CD1-33 Injection Well Completion Plan
Formation Isolation Contingency Options
Updated 12/11/00
16" Conductor to 114'
4-1/2" Camco DB Nipple (3.812" ID)
@ 1700' TVD = 1701' MD
9-5/8" 36 ppf J-55 BTC
Surface Casing
@ 2401' MD / 2400' TVD
cemented to surface
4-1/2" 12.6 ppf L-80 IBT Mod.
tubing run with Jet Lube Run'n'Seal
pipe dope
(A) Bonzai ECP Assembly
- Baker ZXP Packer (4.75" ID)
- Baker HMC Liner Hanger
- XO to IBT-Mod
- blank 4-1/2" joints (TBD)
- Cementing Valve
- Baker Payzone ECP (mud inflated)
-Landing Collar
- 4-1/2" joint (1- 2) blank
· - Guide Shoe
(B) Open Hole Scab Liner
- Baker Payzone ECP (cement inflated)
- 4-1/2" joints (TBD) blank tbg
- Baker Payzone ECP (cement inflated)
- Baker Model XL-10 ECP (anchor)
- Muleshoe / Entry Guide
TOC @ +/- 7278' MD
(+500' MD above top
Alpine)
(C) Open Hole Brid_~e Plu_~ Assembly
- Baker Payzone ECP (cement inflated)
-XO
-Float Collar
- 4-1/2" Float Shoe
Well TD at
Baker S3 Packer set at +/- 7578' 10854' M D I
_ 7056' TVD
® ..... · .... ® ............
N_a ........
7" 26 ppf L-80 BTC Mod
Production Casing @ 7884' MD / 7046' TVD @ 87 deg
CD1-33
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (lbs./ (psi) (psi)
MD/I'VD(fi) gal)
16 114 / 114 10.9 52 53
9 5/8 2401 / 2400 14.2 1086 1532
7"' 7884 / 7046 16.0 3188 2484
'N/A 10854/7056 16.0 3193 N/A
· NOTE: Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in lb./gal
0.052 = Conversion from lb./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP-(0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
.
ASP CALCULATIONS
Drilling below conductor casing (16")
ASP = [(FG x 0.052)-0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1086 - (0.1 x 2400') = 846 psi
2. Drilling below surface casing (9 5/8")
ASP =
ASP =
[(FG x 0.052) - 0.1] D
[(14.2 x 0.052) -0.1] x 2400 -- 1532 psi
OR
FPP - (0.1 x D)
3134- (0.1 x 6926') = 2484 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3134 - (0.1 x 6926') = 2484 psi
9 518" Surface Casing run to 2401 MD 12400' TVD.
Cement from 2401' MD to 1901' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 1901' to
surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess
below the permafrost.
Lead slurry:
(1901'-1557') X 0.3132 ft3/ft X 1.5 (50% excess) = 161.6 ft3 below permafrost
1557' X 0.3132 ft3/ft X 4 (300% excess) = 1950.6 ft3 above permafrost
Total volume = 161.6 + 1950.6 = 2112.2 ft3 => 476 Sx @ 4.44 ft3/sk
System:
Tail slurry:
476 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 ft~/sk, Class G + 30% D053 thixotropic
additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124
extender and 9% BWOW~ D044 freeze suppressant
500' X 0.3132 fts/ft X 1.5 (50% excess) = 234.9 ft3 annular volume
80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 ft~ => 230 Sx @ 1.17 ft3/sk
System:
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S001 accelerator
@ 15.8 PPG yielding 1.17 fta/sk
7" Intermediate Casing run to 7884 MD / 7046' TVD
Cement from 7884' MD to +/- 7278' MD (minimum 500' MD above top of Alpine formation) with Class G +
adds @ 15.8 PPG. Assume 40% excess annular volume.
Slurry:
(7884' - 7278') X 0.1268 ft3/ft X 1.4 (40% excess) = 108 ft3 annular volume
80' X 0.2148 ft3/ft = 17.2 fts shoe joi~nt volume
Total volume = 108 + 17.2 = 125 ft° => 109 Sx @ 1.15 ft~/sk
System:
109 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersa~nt, 0.25% D800 retarder
and 0.18% D167 fluid loss additive @ 15.8 PPG yielding 1.15 ft°/sk
I By Weight Of mix Water, all other additives are BWOCement
ic~t'~ ~ ~"~ For: S. Re~nolds
I Date plottee: 1-Dec-2~
~ PI~ Retere~ae ;e CD1-33 Ve~n~5.
] C~r~no~ ore ;n feet ref~ence
~T.e Ve.;col ~pth ..... f ...... RKB (~. 19)j
~ INT;O j
Phillips Alaska, Inc.i
Structure: CD#1
Field: Alpine Field
Well : 33
Location: North Slope, Alaska
60
40
20
240 220 200 160 160 140
1300
5600
1200
5500
(- West (feet)
120 100 80
1600
1100
5400
0 5300
1100 1000 900
1200 1100 1000
20 1200 1100 1000 900 800 700 600
4o
60 1000 900 800
80
100
120
1000
600
60 40 20 0 20 40 60
80
"-- ....600 :5400 ,..o ~°
1500 '"~'"--.....,:
1400 ?-~400 ~
1000 900 1200 ~ ~ 20
400
700 ~ 400 ~ 0
5700 ~ ~ 500 ~
500 20
~.~800
70O
700 600 400
800
800 /
1800 700 600 500'00 70// /6000
O0 800 800t /: 120(
/
900 .'~ / /6100
I00
·
.-' 90~,/,' 900~
140 1000 449.
160 ..-'" /~000 / /6200
..- / 1000~ i' 1000,
,,o ?--
..- / / ~63oo 15oo
200 / 1600
26o~ ...-'~2oo / ,~vu 2 o
....
280 / i i i i i i i i i i i i i i i i i i i i i
240 220 200 180 160 140 120 100 80 60 40 20 0
<- West(feet)
9OO
1000
900
1000
8o U1
12O0 0
oo [
1300 100 :3'
1400 ~ (D
120 ~
1500 v
I
~¢o v
700 160
180
1200
2OO
22O
240
, 280
2~0 40 60
Phillips Alaska, Inc.,
Structure: CD#I Well : 33 i
Field: Alpine Field Location : North Slope, Alaskai
<- West (feet)
1600 1500 1400 1300 1200 11 O0 1000 900 800 700 600 500 400 300 200 1 O0 0
100
2OO
300
400
5OO
600
700
800
-C: go0
0
(~ 1000
I
1100
1200
1300
3200
3600
1600
4400
5200
4800 1800
1400
15OO
1600
1700
2000
1600
2200 2800
3000
2400 3200
·
2600 2000
3600
4000
· i4~ ~ 600
2800 ··· , .~29 / ,
2400 i~ ~/ // / '
·; ;[/2000 /
2600 2400
2800 !0( /
~oo / //
4200 ,/ 2000
,.- / //
/.oo /~ooo /~oo/
,' ///
/ 2200
I
, /2200 / /
' / / /
t 28002400
!
%
',, /o /
~ 0 600
~ 7000
,, , / /~ooo/
'',, / / /
'" ~ 2800
""' ~ '" 600
, ,,,, / /~oo /
..., ,,,, / / ;, ooo ....
i
i i i i i i i i i
1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100
1800 ,
<- West (feet)
100
2OO
300
400
500
600
700
800 0
r-'
,--i-
900 ~
...+.
1000 v
I
V
1100
12 O0
1300
1400
1500
1600
1700
1800
Dote pzottecl: I-Dec-2000
Plot Reference :-
~at. ore ;n f.~
V~I ~pthl o~ t~ere~e RKB (~n 19),~
.................................. ~.~. ................................................
Phillips Alaska, Inc.!
Structure: CD#1 Well : 55
Field: Alpine Field Location: North Slope, Alaskai
-
<- West (feet)
1800 1600 1400 1200 1000 800 600 400 200 0 200 400 600 800 1000 1200 1400
I I I I I I I ! I I t I I I I / I I I I .~ I, I I I I I I I I I
1000 ~.... 200 ~NNN~' ~ ~ ~ 1000
~-~ooo.~,~8oo t~ I i I '. ~°°~.oo .~oo
,,oo ~o ', ~! f ~ ',,.',. ~ooo -~.. ,,oo
~ / ~ 2800 ' ',
~ ~ooo /~oo i ~.oo , ', ,
~ , / I~OO~/ ~ .,~,oo ~ ,,oo
1400 ~x.~ ' ~". 3000 "',
...""~ '.. ~.oo / ~.oo ~ ,~ ~oo
,,oo .....,,,,...... / / oo/ ooo , oo
"'.. ~ / t [ / 3400 ', ". ~3800
.., '.../~oo I / ~
1800 '.. , /. ~ 3400 J 3200 ~ '. " fi4000 1800
". ~./ ',. / [ ~ 3600 ',
'.. 2~ ". / . / '~ '~ ~4200
~ooo 'Zo~'.,.~, ~oo ~oo ,, ,, ~ ~ooo
/". ', ".. ~ .... / / ; 2~o~., ~oo
2200 ',. ~x '.
~3200 '.. ~/ '~.. / I .~ ,, ~ 2200
/' ".../~00"...... t 3800 ~4200
2400 ~ ~, k "t. / / [, ~ ~ 5000 2400
5400 '. ~ " 4400 ,2800
1~4oo t ", ', '. ~ooo ·
,oo i / .. , ..., t,oo , ...~
~oo "...... ',, t..,~oo
/ /~ '" 'fl'" f,oo ',~ooo ',,.,t
2800 200'", 4~0 5600
/~.oo / '..../', '... ~,ooo ',. ',..
~ /. '~.~o '. ~ ', ',.~
3000 400 ". ~ '.. 5200 ~ '""~ - ~000
/ J4800 ~- " /
/ ~ '.. ', ". 15400
~oo ~oo / ", , '",, I ', ~ ~oo
/ pooo ,, ,,, ..,. ~..o ,,
, ~ ",, [
3400 /4800 ~5200 ".. ', ".. [ 5800 ,, 3400
~ / "'., ,, '.., ~ ,~oo .
~ J5400 '". ~ "'. ~ 6000
~,oo /~ooo r' ..... ,, ... ~ ,, -~,oo
O0 '" ~x '"
~800 ~ ~5200 ] "'... x '~'.. ,8400
~ I ~ ~oo ', ', ... ~',
,ooo~ ~ I '....... ,, '...,.~ ~,oo ,, ~ooo
~¢~ t.o ',. ',, ..':~.oo
"°°1~ ~.~oo , ..,,,,~,~.oo
4400 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ / 4400
1800 1600 1400 1200 1000 800 600 400 200 0 200 400 600 800 1000 1200 1400
(- West (feet)
D~te plotted: 1-Dec-2000
Plot Rcferer~e 1~ CD1-33 Vem;onJf5.
Coordln~B ~ra ;n f~t reference
VeK~ol ~pths ore reference RKB (D~n 19).~
I~I'EO
...............................................................................................
Phillips Alaska, Inc.
Sfrucfure: CD#1 Well: 55
Field: Alpine Field Location: Norfh Slope, Al(3skai
218.52 AZIMUTH
2oo '
***Plane of Proposal***
<- West (feet)
1800 1500 1200 900 600 300
I I I I I I I I I I I I
TARGET LOCATION J
2020' FNL, 1095~ FWL
SEC. 5, T11N, R5E
INTERM. POINT J
936' FSL, 1795' FWL
SEC. 5, T11N, R5E
SURFACE LOCATION
452' FNL, 2549' FWL
SEC. 5, T11N, R5E
0 300
I I I
Beg. 9 Deg. Bid/Turn
HRZ
K-1
LCU
Miluveoch A
Alpine D
'*,.Alpine
~.' '... Target - Csg Pt
',, .,
,, ',,
EOB
· .,
'",. ",. Base Alpine
.,
Begin Nudge
Be~ionc Drop
/u~o. WO Sak.mafrost
C-40
C-30
9 5/8 Cosing Pt.
C-20
K-3
K-2
KOP
EOB
TD LOCATION
659' FSL, 2484' FWL
SEC. 5, T11N, R5E
'". '",,, Beg. 1 Deg. Bid/Turn
'"' ',. Interm Pt-EOC
TD - Csg Pt"'"',.~..~'~
600
I
300
0
300
6O0
9O0
1200
1500
1800 "+'
2100
-..i-
2400 I
V
2700
3000
3300
3600
3900
~ 4200
- 4500
400
8OO
1200
1600
2000
2400
2800.
3200-
.
3600-
4ooo-
[.... 4400
I
4800
5200
56OO
6000
6400.
.
6800-
7200
I RKB Elevation: 56'
Beg~n Nudge
2.00
4.aa
Begin Drop
4.00
2.00
£0C
W. Sok
Phillips Alaska, Inc.
Structure: CD#I Well: 55
Field: Alpine Field Location: North Slope, Alaska
DLS: 2.00 deg per 100 ft
a 18.52 AZIMUTH
2005' (TO TARGET)
***Plane of Proposal***
Permafrost
C-40
~-53/08 Casing Pt.
C-20
KOP
5.00
6.00 DLS: 3.00 dog per 100 ft
~9.00 K-3
~12.00
~ 15.00 K-2
% 18.oo
), 21.00
~ 24,OO
'~ 27.O0
~ TANGENT ANGLE
3g.09 DEG
%%kkAlbl°n-97
Albion-96
~. Beg. 9 Deg. Bid/Turn
. '~ 32.6g .~ TANGENT ANGLE
_. N35~3=9~,L-~v~luveoch^ 89.39 DEG
TARGET ANGLE ",,. ..... ^,o~ne D
z ~"~z~,,~r ,', z z-tJ.~l U'J~J~ ',~ 58 48 Aloine
~ ~0 63Torge~ - Cs..q,~Pt
87.00 DEG "'~'"%:: ' :~OB ._~3,~.~jTD - Csg Pt
DLS: 9.00 dog per 100 ft Bose Alpine .
Boq. I Boq. Bid/Turn
Inform Pt-£OC
i i i i i i i i i i i i i i i i i i i i
0 400 600 1200 1600 2000 2400 2800 3200 3600
Verficol Section (feet) ->
Azimuth 218.52 with reference 0.00 S, 0.00 E from slot #55
FINAL ANGLE
90.39 DEG
[Creoted by bowers Fol': S. Reynolds
Dote plotted: 4-D~-2~
P~ Referee ~ CDI~ Ve~n~5.
~T~ Ve~=l ~pt~ am mlere~ RKB (~n 19).
INTEQ
.i
Phillips Alaska, Inc.
Structure: CD#I Well: 55
Field : Alpine Field Location : North Slope, AlaskaI
151.85 AZIMUTH
a?O4' (*0
***Plane of Proposal***
6000-
6150
6,100
6450
6600
6750
6900
7050
7200
7,150
,1aa
TARGET ANGLE
LCU 5B.4B 87.00 DEC
65'~v~luve(x;h A~ DLS: 9.00 de(J per 100 ft
Alp,ne u
3.08.
Alp,ne
~ Target - C;g Pt
EOB
Base Alpine
TANGENT ANGLE
89.39 DEG
Beg. 1 Deg. Bid/Turn
Interm Pt-EOC
i i i ! i i i i i i i i i i i i i i ! i i i [ i i i i ! i i !
450 600 750 900 1050 1200 1,350 1500 1650 1800 1950 2100 2250 2400 2550 2700
Verficc]l Section (feet) ->
FINAL ANGLE
90.39 DEG
i ! i! i
2850 ,1000 .tl 50
Azlmufh 151.85 wlfh reference 0.00 N, 0.00 E from slot //55
TD - Csg Pt
i i i i i i i i i
,1300 3450 3600 3750 3900
c~w ~ ~.,~ For: S. Reynolds]
Date plotled: 4-Dec-2000 /
Pier Relevance ;8 ~1-~ ~ ~
C~;~l am ;fl f~t ~emnce ~ ~33. /
......................... ~ ................................... J
32O
310
Phillips Alaska, Inc.i
Structure: CD~I Well: 35
Field: Alpine Field
Location: North Slope, AlaskaI
~)'.,~,~,°°340
330 ~'.
35O
TRUE NORTH
1100 "
,.
~ ~3oo
30
470C
300
1100
3OO
290
~0
1700
70
280
8O
270
700 90
26O
25O
100
~00
110
120
220 140
0 ~oo '", 150
200 ~6'~
170
Normal Plane Travelling Cylinder - Feet
All depths shown are Measured depths on Reference Well
130
Creuted by bowers For: S. Reynolds
Date plotted: 1-Dec-2000
Plot Reference ~s CD1-35 VersionS5.
Coordinates are in feet reference elot
True Vertical Depths are reference RKB (Doyon lg).;
iPhillips Alaska, Inc i
Sfruclure: CD#! Well: 53
Field: Alpine Field Location: North Slope,
PROFILE COMMENT DATA
I
! Point
l!i~:~DropNUdge
JW. Sok
Permafrost
C-40
iC-50
i9 5/8 Cosin9 Pt.
C-20
KOP
K-5
K-2
EOB
Albion-97
iAIbion-96
Be9. 9 De9. Bid/Turn
HRZ
K-1
LCU
Miluveoch A
Alpine D
Alpine
Torget - Cs9 Pt
iEOB
Bose Alpine
Beg. 1 De9. Bid/Turn
Interm Pt-EOC
TD - Csg Pt
MD
250.00
550.00
850.00
1047.10
1557.10
2177.10
2587.10
2401.10
2767.10
3500.00
58'35.79
4044.44
4569.68
6083.44
6543.77
6947.19
7064.19
7294.96
7441.73
7617.34
7679.43
7777.54
7883.67
8125.07
8261.86
928.3.58
9584.02
10854.46
Inc Dir TVD North
0.00 150.00 250.00 0.00
6.00 150.00 549.45 - 10.09
0.00 150.00 848.90 -20.18
0.00 150.00 1046.00 -20.18
0.00 130.00 1556.00 -20.18
0.00 150.00 2176.00 -20.18
0.00 150.00 2586.00 -20.18
0.00 150.00 2400.00 -20.18
0.00 150.00 2766.00 -20.18
0.00 150.00 3498.90 -20.18
10.01 256.01 5851.00 -56.44
16.55 256.01 4056.00 -65.27
52.09 256.01 4515.55 -185.52
32.09 256.01 5796.00 -652.92
52.09 256.01 6186.00 -769.65
52.09 256.01 6527.78 -889.47
54.20 217.07 6626.00 -955.20
44.99 188.85 6805.00 - 1067.04
54.44 176.67 6900.00 -1178.40
66.94 165.54 6986.00 - 1528.89
71.55 162.15 7008.00 -1584.62
78.95 157.14 7055.00 - 1475.46
87.00 151.99 7046.00 - 1568.45
89.59 151.98 7055.55 -1779.67
89.59 151.98 7055.00 - 1902.20
89.39 151.98 7065.81 -2804.14
90.59 151.85 7066.00 -2892.75
90.39 151.85 7056.00 -4189.26
Eost
0.00
12.02
24.04
24.04
24.04
24.04
24.04
24.O4
24.04
24.05
-0.08
-39.86
-217.89
-884.66
- 1087.45
-1265 12
-1510 84
- 1565 04
- 1567 56
- 1 543 09
- 1 326 92
- 1 293.89
-1248.66
- 1156.28
-1071.09
-591.21
-545.95
149.75
V. Sect
0.00
0.40
0.81
0.81
0.81
0.81
0.81
0.81
0.81
0.81
28.56
74.52
279.15
1046.17
1279.42
1485.84
1546.55
1685.75
1775.69
1876.19
1909.72
1958.65
2OO4.79
2100.05
2155.50
2562.06
2601.94
3184.25
Deg/lO01
O.OOi
i
2.00i
2.00i
O.OOi
0.00i
0.00'
0.00
0.00
0.00
0.00i
3.00i
!
3.ooi
.:,
3.ooi
0.001
0 00'
0 O0
9
900l
9 O0i
9 00!
9.ooi
9.oo!
..,
9.00!
1.00i
0.00i
0.001
·
1.00i
0.001
Phillips Al&ska, Inc.
CD91
33
slot #33
Alpine Field
North Slope, Alaska
PROPOSAL LZSTING
~kez~esI~9
Your re£ : CD1-33 Version95
Our ref : prop3537
.License :
Date pr4nted : 4-Dec-2006
Date created : 11-Aug-1999
Last revised : 1-Dac-2000'
Field is centre~ on n?o 20 37.100,w150 51 37.53
Structure is centred on nT0 20 37.1000w~50 56 46.04!
Slot locat~ou is n?0 20 32.663,w150 55 37.'375
Slot Grid coordinates are N 5975678.725° S 385773.787
Slot loc&l coordinates a~e 450.74 S 2350.50 E
Pro]ectiout~pe:. &laska - zOne 4, Spheroid: Clarke - 1866
Re~erenoe North is .True North
~SS!LULUO::) 'SUO0 S~ '~ i~ e'4sqV
oooz
03AI30 W
Ph£11ips Alaska, Inc.
CD#lo 33
Alpine Field,North Slope, Alaska
Measured Inclin Azimuth True Vert
Depth Degrees Degrees Depth
0.00 0.00 0.00 0.00
100.00 0.00 130.00 100.00
200.00 0.00 130,00 200.00
250.00 0,00 130,00 250.00
350,00 2,00 130,00 349,98
450,00 4.00 130,00 449.84
550,00 6,00 130,00 549.45
650,00 4.00 130.00 649,07
750,00 2,00 130,00 748,92
850,00 0.00 130.00 848.90
1000,00 0.00 130,00 998,90
1047.10 0.00 130.00 1046.00
1500,00 0.00 130.00 1498.90
1557.10 0,00 130.00 1556.00
2000.00 0.00 130.00 1998.90
2177.10 0,00 130,00 2176,00
2387.10 0.00 130.00 2386,00
2401,10 0,00 130,00 2400.00
2500,00 0.00 130,00 2498,90
2767.10 0,00 130,00 2766,00
3000,00 0,00 130,00 2998,90
3500,00 0,00 130,00 3498,90
3600,00 3,00 236,01 3598.86
3700.00 6,00 236,01 3698,54
3800,00 9,00 236,01 3797.67
3833,79 10,01 236,01 3831.00
3900.00 12,00 236,01 3895,99
4000,00 15,00 23.6.01 3993,21
4044.44 16,33 .236,01 4036,00
4100.,0018,00 236,01 4089,08
4200~00 .21,00 236,01 4183,34
4300.00 24,00 236,01 4275,71
4400,00 27.00 236,01 4365,96
4500,00 30,00 236,01 4453,83
4569,68 32,09 236,01 4513,53
5000.00 32,09 236,01 4878.10
5500.00 32,09 236,01 5301,71
6000,00 32,09 236~01 5725,31
6083.44 32,09 236,01 .5796,00
6500,00'32.09 236,01 6148,92
6543.77 32,09 236,01 6186,00
6947,'1932,09 236,01 6527,78
7000,00 32,69 227,20 6572,40
7064,19 .34,20 217,07 6626,00
7100,00 35,39 211,82 6655,42
7200,00 .39,75 198,87 6734,79
7294.96 44.99 188,83 6805,00
7300,00 45,29 188,35 6808,55
7400,00 51,63 179,79 6874,90
7441.73 54,44 176,67' 6900.00
RECTANGULAR
COORDINATES
0.00S 0.00E
0.00S 0.00E
0.00S 0.00E
0.00S 0.00E
1,125 1.34E
4.495 5.358
10 · 095 12 · 028
15 , 695 18,708
19.055 22.71E
20.185 24.04E
20.185 24.048
20.185 24.048
20.185 24.04;-
20.185 24.048
20.185 24.048
20.185 24.04E
20.185 24.04E
20.185 24.048
20 . 185 24 . 048
20.18S 24.04R
20,185 24,048
20,185 24,058
21,645 21.878
26.035 15,378
33,325 4,558
36.445 0.08~
43 · 515 10 · 56W
56,565 29,91W
63 · 275 39 · 86W
72 · 445 53 . 46W
91 · 105 81 . 13W
112 · 495 112 . 85W
136.565 148.55W
163.235 188 . 10W
183 · 325 217.89W
311.135 407 . 44W
459. 645 627,68W ,
608 · 145 847'. 91W
632,926 ' 884.66W
756 · 65S 1068.15W
769 . 655 1087.43W
889.475 1265.12W
907.015 , 1287.23W
933.205 ' 1310.84W
950.055. 1322.38W
1005,025 1348.04W
1067. 045 1363.04W
1070,575 1363,58W
1145,085 ' 1368,61W
1178 .'405 1367,56W
PROPOSAL LISTING Page 1
Your re£ : CD1-33 Version%5
Last revised : 1-Dec-2000
GRID COORDS GEOGRAPHIC
East~ng Northing C O O R D I N A T R S
385773.79 5975678.72 nT0 20 32.66 w150 55 37.38
385773.79 5975678.72 nT0 20 32.66 w150 55 37.38
385773.79 5975678.72 n70 20 32.66 wlSO 55 37.38
385773.79 5975678.72 nT0 20 32.66 w150 55 37.38
385775.11 5975677.58 nV0 20 32.65 w150 55 37.34
385779.06 5975674.16 n70 20 32.62 w150 55 37.22
385785.65 5975668.45 n70 20 32.56 w150 55 37.02
385792.24 5975662.75 nT0 20 32.51 w150 55 36.83
385796.19 5975659.32 nT0 20 32.48 w150 55 36.71
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51.5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20 32.46 w150 55 36.67
385797.51 5975658.18 nT0 20,32.46 w150 55 36.67
385797,51 5975658,18 nT0 20 32.46 w150 55 36,67
385797,51 5975658,18 n70 20 32,46 w150 55 36.67
385795,32 5975656,75 nT0 20 32.45 w150 55 36..74
385788,75 5975652,47 nT0 20 32.41 w150 55 36,93
385777,82 5975645,34 nT0 20 32,34 w150 55 37~24
385773,14 5975642,29nT0 20 32,31 w150"55 37,38
385762,55 5975635,39nT0 20 32,24 w150 55 37.68
385743,00 5975622,64nT0 20 32,11 w150 55 38,25
385732,95.5975616,09'nT0 20 32.04 w150 55 38,54
385719,22 5975607,13nT0 20 31,95 w150 55 38,94
385691.26 5975588.91'nV0 20 31,77 w150 55 39,75'
385659,21 5975568,01 nT0 20 31,56 w150 55 40,67
385623.15 5975544,51 nT0 20 31,32 w150 55 41,72
385583,19 5975518.45 nT0 20 31.06 w150 55 42.87
385553,09 5975498,83 nT0 20 30,86 w150 55 43',74
3853'61.59 5975374,00 nT0 20 29,60 w150.55 49,28
385139,09 5975228.94 nT0 20 28,14 w150 55 55,71
384916,59 5975083,89 nT0 20 ·26,68 W150 56 02,15
384879,46 5975059,69 nT0 20 26,44' w150 56 03,22
384694.09 5974938,84 nT0 20 25.22 w150 56 08.58
384674;62 59;74926,14nT0 20 25,10 wi50 56 09,i5
384495,09 5974809.11 nT0 20 23,92. w150 56 14.34
384472.72 5974791.91 nT0 20 23.'/5 w150 56 14.98
384448.70 5974766.10 nT0 20 23.49 w150 56 15.67
384436,91 5974749.43 nT0 20 23,32 v150 56 16.01
384410,40 5974694,87 nT0 20 22,78 w150 56 16,76
384394,43 5974633.10 nT0 20 22:17 w150 56 17,20
384393,85 5974629,58 nT0 20 22,14 w150 56 17.21
384387,66 5974555,16 nT0 20 21,40 w150 56 17,36
384388,18 5974521,83 nT0 20 21,08 'w150 56 17.33
u .o.o.O!~lmmOO 'suoo seg t~.1!0
O3A130.3
All data in feet unless otherwise s~ated. Calculationuses minimumcurvature method.
¢oo~dlnates £ron slot #33 and ~VD £rom RKB (Do,on 19) (56.00 Ft above mean sea level).
Bott~hole d/stance is 4191.93 on sz~nuth 177.95 degrees fronwellhead.
Total Dogleg for wellpath is 131.77 degrees.
Vertical section is from wellhead on azimuth 218.52 degrees.
Grid is alaska - Zone 4.
Grid coor~4nates in F~ET and ccm~uted using the Clarke - 1866 spheroid.
Presantedby Baker Hughes INTEQ
, .
Phillips ~aska, Inc.
CD#1,33
~pine F~eld,Nor~h Slope,
PROPOSAL LISI~I~ Page 2
Your re£ : CD1-33 Version#5
Last rev£sed : 1-Dec-2000
HeasuredZncl~n Azimuth TL-ue Vert R E C ? A N G U L A R G R Z D C 00 R D S G ~ 0
Dep~ Degrees ~ees ~th C 0 0 R D I N A T R S hst~ Not~g C 0 0
7500.00 58.48 1~2.66 6932.20 1226.72S 1363.01W 384391.98 59~4473.45 nTO 20
7600.00 65.67 166.53 6979.03 1313.48S 1346.92W 384406.72 5974386.46 nTO 20
7617.34 66.94 165.54 6986.00 1328.89S 1343.09W 384410.31 5974370.99 nTO 20
7679.43 71.55 162.15 ~008.00 1384.62S 1326.92W 384425.61 5974315.02 nTO 20
7700.00 73.08 161.07 7014.25 1403.22S 1320.74W 384431.50 5974296.33 nTO 20
7777.54 78.93 157.14 7033.00 1473.46S 1293,89w 384457.25 5974225.69 nTO 20
7800.00 80.63 156.03 ;036,98 1493.74S 1285.11~ 384465.72 5974205.28 nTO 20
7883.67 8~.00 151,99 7046,00 1568.45S 1248.66~ 384500.99 5974130.02 nTO 20
7883.69 8~,00 151.99 ~046.00 1568.46S 1248.66~ 384501.00 5974130.00 nTO 20
7983.69 88.00 151.98 ;050.36 1656.66S 1201.V3~ 384546.54 5974041.09 nTO 20
8083.69 89.00 151.98 ~052,98 1;44.91S 1154.78~ 384592.12 5973952.13 nTO 20
8123.0; 89.39 151.98 7053.53 1379.67S 1136.28~ 384610.07 5973917.09 nTO 20
8261.86 89.39 151.98 7055.00 1902.20S 1071.09~ 384673.34 59~3;93.5; nTO 20
8500.00 89.39 151.98 705~.52 2112.42S 959.24~ 384381,89 5973581.66 nTO 20
9000.00 89.39 151.98 7062.81 2553.80S 724.40~ 385009.82 5973136.71 nTO 20
9283.58 89.39 151.98 7065.81 2804.14S 591.21~ 385139.10 5972884.35 nTO 20
9300.00 89.56 151.96 7065.96 2818.63S 583.50W 385146.59 5972869.74 nTO 20
9384.02 90.39 151.85 V066.00 2892.75S 543.93N 385184.99 5972795,02 nTO 20
9384.04 90.39 151.85 ~066.00 2892.78S 543.92W 385185.00 5972;95.00 nTO 20
9500.00 90.39 151.85 7065.21 2995.02S 489.22W 385238.10 5972691,93 nTO 20
10000.00 90.39 151.85 ;061.81 3435.87S 253.35W 385467.06 5972247.50 nTO 19
10500.00 90.39 151.85 7058.41 38q6.V3S 17.48~ 385696.03 59~1803.06 nTO 19
10854.46 90.39 151.85 ~056.00 4189.26S 149.73E 385858.35 5971488.00 nTO 19
GRAPHIC
RDINATES
20.60
19.75
19.60
19.05
18.87
w150 56 17.20
w150 56 16.73
w150 56 16.62
w150 56 16.14
w150 56 15.96'
18.17
17.98
17.24
17.24
16.37
w150 56 15.18
w150 56 14.92
w150 56 13.86
w150 56 13.86
w150 56 12.49
15.51
15.16
13.96
11.89
07.55
w150 56 11.12
w150 56 10.58
w150 56 08.67
w150 56 05.41
w150 55 58.55
05.09
04.94
04.21
04.21
03.21
w150 55 54.67
w150 55 S4.44
w150 55 53.29
w150 55 53.29
w150 55 51.69
58.87
54.54
51.46
w150 55 44.80
w150 55 37.92
w150 55 33.04
c~ta iu feet unless, otherwise stated. Calculat$on uses ~ c~at~e ~od.
Coo~na~es ~r~ slo~ %33 ~d~ fr~ (~ 19) (56.00 F~ ~~ sea 1~1).
Bo2t~hole ~s=~ce is 4191.93 ~ az~h 177.95 d~rees fr~llhead.
~al Do~l~ for~11pa~h is 131.77 d~rees.
Vertical secbi~ is Er~llhead ~'az~th 218.52 ~rees..
Grid is alas~ - Z~e.4.
'Grid coord~tes in F~ ~ c~t~ us~ ~ Clarke - 1866 ~eroid,
Phillips Alaska, Inc.
CD#1,33
Alpine Field,North Slope, Alaska
PROPOSAL LZSTZNG Page 3
Your re£ : CD1-33 Version#5
Last revised : 1-Dec-2000
Comments in wellpath
MD TVD Rectangular Coords. Cc=ment
250.00 250.00 0.00S 0.00E Begin Nudge
550.00 549.45
850.00 848.90
1047.10 1046.00
1557.10 1556.00
2177.10 2176.00
2387.10 2386.00
2401.10 2400.00
2767.10 2766.00
3500.00 3498.90
3833.79 3831.00
4044.44 4036.00
4569.68 4513.53
6083.44 5796.00
6543.77 6186.00
6947.19 6527.78
7064.29 6626.00
7294.96 6805.00
744~.73 6900.00
7617.34 6986.00
7679.43 7008.00
7777.54 7033.00
7883.67 7046.00
7883.69 7046.00
8123.07 7053.53
8261.86 7055.00
9283.58 7065.81
9384.02 7066.00
9384,04 7066,00
~0854.46 7056'.00
10.09S 12.02E Begin Drop
20.18S 24.04~
20.18S 24.04B H. Sak
20.18S 24.04E
20.18S 24.04E C-40
20.18S 24.04E C-30
20.18S 24.04E 9 5/8' Casing P~.
20.18S 24.04E C-20
20.18S 24.05~ KOP
36.44S 0.08W K-3
63.27S 39.86W K-2
183.32S 217.89W EOB
632.92S 884.66W A1bian-97
769.65S 1087.43W Albian-96
889.47S 1265.12W Beg. 9 Deg. Bld/Turn
933.20S 1310.84W HRZ
1067.04S 1363.04W K-1
1178.40S 1367.56W LCU
1328.89S 1343.09W Miluveach A
1384.62S 1326.92W Alpine D
1473.46S 1293.89W Alpine
1568.45S 1248.66W Target - Csg Pt
1568.46S 1248.66W CD1-33 Tgt Rvsd 21-Nov-00
1779.67S 1136.28W EOB
1902.20S 1071.09W Base Alpi~e
2804.14S 591.21W Beg. I Deg: Bld/Turn
2892.75S 543.93W Zn~erm
2892.78S 543.92W CD1-33 ZntermP~ Rvsd 21-Nov~00
4189.26S 149.73E TD- Csg Pt
Casing positions in string 'A'
~ ~ ~ ~ Rect~lar CoorS. Bob ~ Bo~ ~ Rec~Zar CoorS. Casi~
.................................. i ............................................................... 7--T .....
0.00 0.00 0.00S 0.00E 7883.69 7046.00 1568.46S 1248.6~ 7' Casi~
0.00 0.00 · 0.00S ' 0.00~ 2401.10 2400.00 20.18S 24.04E 9 5/8' Cas~
Targets associated w~th this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
............. . ...... ~- ................................................................................ ~ .....
CD1-33 Tgt Rvsd 21-N 384501.000,5974130.000,0.0000 7046.00 1568.46S 1248.66W 22-Nov-2000
. CD1-33 ZntentPt Rvsd 385185.000,5972795.000,0.0000 7066.00 2892.78S 543.92W 22-Nov-2000
Phillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alask= 99510-0360
Telephone 907-276-1215
December 12, 2000
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re:
Application for Permit to Drill
CD1-33
Dear Sirs:
RECEIVED
DEC 1 000
Alas~ Oil & Gas Cons. Commlalat
Anchorage
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Water Alternating
Gas (WAG) injection well from the Alpine CD1 drilling pad. The intended spud date for
this well is December 24, 2000. It is intended that Doyon Rig 19 be used to drill the well.
CD1-33 will be drilled to penetrate the Alpine sand horizontally. 7" casing will then be
run and cemented in place. A horizontal section will then be drilled and the well
completed as an open hole injector. At the end of the work program, the well will be shut
in awaiting surface connection.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for your
review. Pertinent information attached to this application includes the following:
1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program, including a request for approval of annular pumping
operations.
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Proposed Completion diagram with open hole isolation options.
7. Pressure information as required by 20 ACC 25.035 (d)(2).
8. Proposed cementing program and calculations.
9. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
If you have any ques. , ~s or require further information, pleas~ contact Scott Reynolds
at 265-6253 or Chip Alvord at 265-6120.
Sincerely,
....
Scott D. Reynolds
Drilling Engineer
Attachments
CC:
CD1-33 Well File / Sharon AIIsup Drake
Chip Alvord
Mike Erwin
Gracie Stefanescu
Lanston Chin
ATO 1054
ATO 1030
ANO 384
Anadarko - Houston
Kuukpik Corporation
e-mail ·
Tommy_Thompson @ anadarko.com
RECEIVED
DEC 1 ~ ZOO0
American Express' Cash' Advance D=aft lo4
PAY TO THE . ' . .? . -
Issued by Integrated Payment System, Inc DOLLARS
~,,,u~ ~o~^.ou.~ov~$~ .
WELL PERMIT CHECKLIST COMPANY F~.-&'////~_~ WELL NAME ~ ~/- ~ PROGRAM: exp dev redrll serv / wellbore seg ann. disposal para req
FIELD & POOL ! Z. OIC~ INIT ~SS ~~/~ ~~J~ GEOL AR~ ~~ UNIT~ ~ ~~~ ON/OFF SHORE ~
ADMINIST~TION 1. Ps,it fee affached ........................ ~
2. Lease number appmp~a~:~ ~ ~~ .~ ~- ~ ~ ~ ~~ ~~ ~ ~~ ~~~' ~~o ~ ~ ~ ~ ~/~
3. Unique well name and number .................. ~ /~~ ~ ~ ~ ~~. ~
4. Well Io~ted in a defined pool ..................
DATE
5. Well located proper distance from ddlling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in ddlling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can.be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
ENGINEERING
14. Conductor stdng provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long stdng to surf csg ........
18. CMT will cover all known productive hodzons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
. N
N
N
DATE
21.
22.
23.
24.
25.
26.
27.
28.
29.
.. 31.
32.
II A~F~,R DATE ' 33.
II_~_'/~, ~-~b 34.
If a re-drill, has a 10-403 for abandonment been approved... .-y--ff YA i~, ~" ~..J['~","'c~' '
Adequate weilbore separation proposed .............. i~) N ~..k~,~: Gc~<~'~,'~. '~'~. ~.' ' '
If diverter required, does it meet regulations .......... ' ,~ N ~ ' - '. - .
Drilling fluid program schematic & equip list adequate .....
BOPEs, do they meet regulation ....... ;. ~.~..,,, ..... .
BOPE press rating appropriate; test to L'gE-S.x~ Dsig.
Choke manifold complies w/APl R.P-53 (May 84) ........
Work will occur without operation shutdown .................. ........... ~:.~ ~, <-J~~ ~ ~'~" '~'-'~-"~'~ ~. ~"~r"'""~ ~r'~
Is presence of H2S gas probable ~A,._3~ ~'.~.~. ~, ~ is~..~x'~'~C. ~,.~..~,
DataPermitpresentedcan be issued wlo hydrogen sulfide measureS.on potential overpressure zones .... ·
Seismic analysis of shallow gas zones ......... ' .....
N '
Seabed condition survey (if off-shore) ......... ' .... ~?d/f Y .
Contact name/phone for weekly progress reports [expl~,te~ only] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zonei ....... Y N
APPR . DATE (B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical'integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E). will not circumvent 20 AAC 25.252 Or 20 AAC 25.412.. Y N
ENGINEERING: . UlClAnnular COMMISSION:
~QF-i..~....~_~,." . WM ~)1~1SHC~ l~.~'
Comments/Instructions:
~c,~ i'~"co,~',~ ~*~. c~.p. i~.. ~' ~l~r~~ ~.~ p~'
0
Z
0
rtl
Z
-!-
c:Vnsoffice\wordian~diana\checklist (rev. 11/01fl00)