Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-212 T R A N S M I T T A LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – CRU DATE: 12/19/2023 Transmitted: North Slope, Colville River Unit Colville CD1-01A 50-103-20299-01 212099_CD1-01A_PERF_23Jul22 212099_CD1-01A_WFL_23May2022 CD1-04 50-103-20346-00 200117_CD1-04_PLUG_27Aug2022 CD1-33 50-103-20357-00 222105_CD1-33_Puncher_21Sep2022 CD1-48A 50-103-20592-01 212004_CD1-48A_LDL_28Jul2022 CD2-02 50-103-20513-00 205109_CD2-02_LDL_11Oct2022 205109_CD2-02_LDL_12Jul2022 205109_CD2-02_Patch_07Nov2022 205109_CD2-02_PLUG_23Aug2022 CD2-15 50-103-20386-00 201159_CD2-15_LDL_06Oct23 CD2-310 50-103-20826-00 220028_CD2-310_DHSIT_10Aug2022 220028_CD2-310_USIT_25Apr2022 CD2-404 50-103-20530-00 206054_CD2-404_Patch_30Dec2021 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38291 T38292 T38293 T38294 T38295 T39296 T38297 T38734 200-212 CD1-33 50-103-20357-00 222105_CD1-33_Puncher_21Sep2022 Meredith Guhl Digitally signed by Meredith Guhl Date: 2024.04.23 11:54:09 -08'00' 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _______1__________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: BF: Total Depth: 4645' FNL, 2472 FWL, Sec 5, T11N, R5E 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: 23. BOTTOM 16" H-40 114' 9-5/8" J-55 2376' 7" L-80 8701' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate 3892-3923 30 bbls of 15.8 C;ass G 3028-3070 21 bbls of 15.8 Class G 2730-2800 25 bbls of 15.8 Class G 40' 2376 If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, TUBING RECORD 130 sx Class G6" 7654'4.5" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 11/23/2022 200-212/ 322-459, 321-426, 322-456 50-103-20357-00-00 CRU CD1-33 ADL0025559 97-007 11/14/2022 10854' MD/7059'TVD 10854' MD/7059'TVD 37 P.O. Box 100360 Anchorage, AK 99510-0360 385773 5975677 1948 FNL, 1047 FWL, Sec 5, T11N, R5E CASING WT. PER FT.GRADE 11/15/2022 CEMENTING RECORD 5974202 804'MD/806'TVD SETTING DEPTH TVD 5971484 TOP HOLE SIZE AMOUNT PULLED 384454 385846 TOP SETTING DEPTH MD suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. N/A Coville River Field/ Alpine Oil Pool 453' FNL, 2348' FWL, Sec 5, T11N, R5E 2418' MD/2417'TVD BOTTOM 40' 114 Per 20 AAC 25.283 (i)(2) attach electronic information 29 7039 62.58 36 114' 40' 7878 SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 20" 8-3/4" 10 cu yds Type 3 2375' 365 sx AS II & 232 sx Class G Flow Tubing 5994-7658 2060-2488 2730'MD/2729'TVD to 2772'MD/2771'TVD CMT SQZ 3028'MD/3027'TVD to 3070MD'/3069'TVD CMT SQZ 3892'MD/3888'TVD to 3923'MD/3919'TVD CMT SQZ 4100'MD/4090'TVD to 4110'MD/4099'TVD CMT SQZ Gas-Oil Ratio: 4100-4110 20 bbls of 15.8 Class G 3216-3988 30 bbls of 15.8 C;ass G 2800-3118 21 bbls of 15.8 Class G Choke Size: 32.5 bbls of 17.00 C;ass G Sr Res EngSr Pet GeoSr Pet Eng N/A Oil-Bbl: Water-Bbl: 7597'MD/6981' TVD 1bbl of 15.8 Class G 5994-8000 109bbls of 15.8 Class G Water-Bbl: PRODUCTION TEST N/A Date of Test: Oil-Bbl: Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment By James Brooks at 1:17 pm, Dec 22, 2022 Abandoned 11/23/2022 JSB RBDMS JSB 122722 xGDSR-1//3/23 Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD Surface Surface 804 806 7798 7033 10854 7059 (Alpine C) 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Jenna Taylor Digital Signature with Date:Contact Email:jenna.l.taylor@conocophillips.com Contact Phone:907-263-4522 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: Yes No Well tested? Yes No 28. CORE DATA If Yes, list intervals and formations tested, briefly summarizing test results for each. Attach separate pages if needed and submit detailed test info including reports and Excel or ASCII tables per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment; or 90 days after log acquisition, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Formation Name at TD: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. TPI (Top of Producing Interval). Authorized Name and INSTRUCTIONS Top of Productive Interval (Alpine D) Authorized Title: Senior Wells Analyst Direction Survey, Operations Summary, Cementing Summary, Well Schematic Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Jenna Taylor DN: CN=Jenna Taylor, E=jenna.l.taylor@conocophillips.com Reason: I am the author of this document Location: Date: 2022.12.22 12:43:20-09'00' Foxit PDF Editor Version: 12.0.1Jenna Taylor 17 ppg Kick Off Plug 15.8 ppg Balanced Plug & Squeeze #1 15.8 ppg Balanced Plug & Squeeze #2 Tubing Cut @ 4415' MD / 4384' TVD 4-1/2" 12.6# L-80 IBT-M 10/10/2022 JJL CD1-33 Rig Abandonment P&A RKB = 58.5' AMSL 16" 62.58 ppf H-40 Insulated Conductor 114' MD/ TVD - Cemented to surface Surface Casing 9-5/8" 36# J-55 BTC-M | Set @ 2376' MD / TVD 15.8 ppg Class “G” Squeeze 6-1/8” Production Hole Section Open Hole Completion TD @ 10854' MD / 7059' TVD 7” 26# L-80 BTC-M 7884' MD / 7046' TVD ISOLATION PLUG TOC Kick-off Plug @ 2176' MD/ TVD Cement Plug @ 5944' MD / 5676' TVD CIBP @ 4223' MD / 4206' TVD Perfs @ 4100' MD / 4090' TVD to 4110' MD / 4099' TVD CMT Retainer @ 4048' MD / 4040' TVDTop Qannik 4046' MD / 4038' TVD Base Qannik 4073' MD / 4064' TVD Tag & Test 1500 psi (GOOD) @ 3216' MD / 3215' TVD Perfs @ 3892' MD / 3888' TVD to 3923' MD / 3919' TVD Tag & Test 1500 psi (GOOD) @ 3988' MD / 3982' TVD CIBP @ 3118' MD / 3117' TVD Perfs @ 3028' MD / 3027' TVD to 3068' MD / 3067' TVD Base Halo 3058' MD / 3057' TVD Top Halo 3038' MD / 3037' TVD 15.8 ppg Balanced Plug & Squeeze #3 Perfs @ 2730' MD / 2729' TVD to 2770' MD / 2769' TVD Top Plug #2 @ 2800' MD / 2799' TVD Tag & Test 1500 psi (GOOD) @ 2675' MD / TVD Casing Cut #1 @ 2635' MD / TVD Casing Cut #2 @ 2363' MD / TVD Casing Cut #3 @ 2490' MD / TVD Page 1/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/18/2022 00:00 9/18/2022 06:00 6.00 MIRU, MOVE MOB P CON'T WITH CLEANING OF WIND WALLS AND DERRICK, FINISH PREPPING 5" DERRICK FINGERS FOR INSPECTION, HOUSE KEEPING AS NEEDED, COMBINE ALL USED OIL AND DIESEL, PREP FOR REMOVAL 0.0 0.0 9/18/2022 06:00 9/18/2022 12:00 6.00 MIRU, MOVE MOB P CONT. PRESSURE WASHING IN DERRICK. FLUSH MUD PUMPS, MUD LINES AND MPD CHOKE SKID WITH DEEP CLEAN PILL. FLUSH POP OFF VALVES. REMOVE RIG FLOOR STEAM HEATER HOSE AND SEND OUT FOR REPAIR. CONT. PREPPING 5" DERRICK FINGERS FOR TUBO. REMOVE 5 1/2' LINERS AND PREP FOR 6" LINERS ON CD1. PAINT TANK FARM PUMP HOUSE. HOUSEKEEPING IN ROCKWASHER. 0.0 0.0 9/18/2022 12:00 9/18/2022 18:00 6.00 MIRU, MOVE MOB P CONT. PRESSURE WASHING IN DERRICK. CONT. PAINTING TANK FARM PUMP HOUSE. REMOVE 5 1/2 LINERS ON #1 MP, REMOVE CAPS AND INSPECT SEATS & VALVES. REMOVE WEAR PLATES AND WIRE WHEEL. PUMP DEEP CLEAN PILL THROUGH TANK FARM RIG LINES AND OFFLAOD TO ROCKWASHER. REPLACE ABSORB IN PIPESHED UNDER HYDRAULIC UNIT 0.0 0.0 9/18/2022 18:00 9/19/2022 00:00 6.00 MIRU, MOVE MOB P CON'T CLEANING OF RIG FLOOR, REMOVE ROTARY TABLE COVER AND BEGIN CLEANING INSPECT VALVE AND SEATS ON MP #2, INSTALL 6" LINERS ON MP #2 ASSIST IN CRACK CHECKING ON 5" DERRICK FINGERS PREP BOILER #2 FOR INSPECTION, REMOVE HCR KILL AND MOBILIZE NEW ONE FOR INSTALL 0.0 0.0 9/19/2022 00:00 9/19/2022 06:00 6.00 MIRU, MOVE MOB P CON'T WITH LINER SWAP AND MAINTENCE ON MP #2, INSTALL NEW HCR KILL ON BOP, CON'T CLEANING ROTARY TABLE AND RIG FLOOR, HOUSE KEEPING THROUGH OUT RIG AS NEEDED 0.0 0.0 9/19/2022 06:00 9/19/2022 12:00 6.00 MIRU, MOVE MOB P TROUBLESHOOT ROTARY TABLE. CONT. CLEANING DERRICK WINDWALLS. TEST RUN C-27 CAT. SERVICE DERRICK CENTRIFUGE. CONT. WITH MUD PUMP LINER SWAP. OFFLOAD USED DIESEL AND USED OIL OFF RIG 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 2/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/19/2022 12:00 9/19/2022 18:00 6.00 MIRU, MOVE MOB P CONT. CLEANING WIND WALLS. AK BOILER INSP. INSPECTED #1 BOILER (EXTERNAL) #2 BOILER (INTERNAL). PREP #2 BOILER FOR ASSEMBLY. INSTALL ROTARY TABLE COVER. REMOVE HOTSY FROM RIG FLOOR. INSTALL 4" DOUBLE LOCKING CAMLOKS IN TANK FARM PUMP HOUSE. CONT. INSTALLING 6" LINERS IN MUD PUMPS. CLEAN CENTRIFUGAL ROOM SUCTION LINES 0.0 0.0 9/19/2022 18:00 9/20/2022 00:00 6.00 MIRU, MOVE MOB P OPEN RAM DOORS ON BOP AND INSPECT FOR "BWM", FINISH UP MAINTENCE ON MP #2, CLEAN PITS IN ROCKWASH, CON'T WITH HOUSE KEEPING THROUGH OUT RIG, PUT BOILER #2 BACK TOGETHER 0.0 0.0 9/20/2022 00:00 9/20/2022 06:00 6.00 MIRU, MOVE MOB P CON'T W/ "BWM", INSTALL NEW XT- 39 SAVER SUB, TQ TO 45K, REMOVE ADAPTOR FLANGE FROM RISER AND STAGE FOR RIG MOVE, CON'T WITH RIG CLEANING, CON'T WITH BOILER WORK ON #2, INSTALL NEW CLIPPER SEALS ON MP #2, CLEAN SCREENS AND SUCTION CHAMBER 0.0 0.0 9/20/2022 06:00 9/20/2022 12:00 6.00 MIRU, MOVE MOB P CHANGE OUT TD BELL GUIDE F/ 4". CHANGE OUT CLIPPER SEALS ON MUD PUMP #1. BRING 5" DERRICK FINGERS TO RIG FLOOR AND PREP FOR INSTALLING IN DERRICK. INSTALL BOILER #2 HAND HOLES. CONT. PRESSURE WASHING RIG EXTERIOR WIND WALLS. CLEAN AND ORGANIZE PARTS. PRIME AND PAINT BARE METAL. 0.0 0.0 9/20/2022 12:00 9/20/2022 18:00 6.00 MIRU, MOVE MOB P REMOVE 5-7/8" DP DERRICK FINGERS AND REPLACE WITH 5" DP FINGERS. CONT. ASSEMBLY OF BOILER #2. REMOVE SHAKER SCREEN AND PREP FOR CD-1. CONT. CHANGING OUT CLIPPER SEALS ON MUD PUMP #1. 0.0 0.0 9/20/2022 18:00 9/21/2022 00:00 6.00 MIRU, MOVE MOB P CON'T WITH BOILER WORK ON #1, CON'T W/ PUTTING MP #1 BACK TOGETHER, HOUSE KEEPING THROUGH OUT RIG, REMOVE BLIND AND VBR'S, SEND TO SHOP TO BE REBUILT, PRESSURE WASHING BOP DECK 0.0 0.0 9/21/2022 00:00 9/21/2022 06:00 6.00 MIRU, MOVE MOB P FINISH WORKING/INSPECTION ON MP#1 CONT. WITH CLEANING OF BOP DECK REMOVE HCR FROM BOP DECK AND TAKE TO SHOP, WEEKLY DERRICK INSPECTION, GENERAL HOUSE KEEPING AND WORK ORDERS 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 3/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/21/2022 06:00 9/21/2022 12:00 6.00 MIRU, MOVE MOB P SET MUD PUMP RELIEF VALVES, HOUSEKEEPING IN BOP DECK. REBUILD LOWER 3½ X 6" VBRS, CHANGE OUT LINKS ON THE TOP DRIVE BALES. CHANGE OUT #2 MUD PUMP PULSATION DAMPNER. 0.0 0.0 9/21/2022 12:00 9/21/2022 18:00 6.00 MIRU, MOVE MOB P CONTINUE TO CHANGE OUT PULSATION DAMPNER ON #2 MUD PUMP & FILL WITH NITROGEN TO 900 PSI. CONTINUE TO CLEAN IN THE BOP DECK AND CELLAR AREAS. SEND BLIND/SHEAR RAMS TO THE SHOP FOR REBUILD. REPAIR HOTSY PRESSURE WASHER. REPAIR LEAKING DRAGON WATER HEATER IN THE PUMP ROOM. COMPLETE PIPESHED AND BOILER INVENTORIES. CHECK PSI IN ACCUMULATOR BOTTLES. 0.0 0.0 9/21/2022 18:00 9/22/2022 00:00 6.00 MIRU, MOVE MOB P LOCATE ALL 5 7/8" HANDLING EQUIPMENT AND STAGE FOR INVENTORY. CONTINUE CLEANING IN BOP DECK AND CELLAR AREAS. COMPLETE MP2'S AS NEEDED. PREP BOILER #2 FOR STATE INSPECTION. 0.0 0.0 9/22/2022 00:00 9/22/2022 06:00 6.00 MIRU, MOVE MOB P GENERAL HOUSEKEEPING, RIG MP2'S, CHECK OIL AND INSPECT MOVING GENERATORS. 0.0 0.0 9/22/2022 06:00 9/22/2022 12:00 6.00 MIRU, MOVE MOB P GENERAL HOUSEKEEPING, RIG MP2'S, REMOVE SUB INTERCONNECT LINES, REMOVE LVT PUMP PLUMBING AND CLEAN OUT NUT PLUG, WELD INSPECTION HATCH ON PITS DRAG CHAIN. WELD SPRAY PORTS ON CENTRIFUGE DUMP AND INSPECTION HATCH. 0.0 0.0 9/22/2022 12:00 9/22/2022 18:00 6.00 MIRU, MOVE MOB P CONTINUE TO REMOVE INTERCONNCTS ON THE SUB. FINISH WELDING PROJECTS IN THE PITS. INSTALL 3½ X 6" VBR'S INTO LOWER RAMS. REMOVE PUMP ROOM INTERCONNECTS AND POP OFF LINES OVER THE WATER TANKS. REMOVE MUD LINE INTERCONNECTS IN THE PITS. 0.0 0.0 9/22/2022 18:00 9/23/2022 00:00 6.00 MIRU, MOVE MOB P CONTINUE WITH PUMP ROOM INTERCONNECTS AND POP OFF LINES. CONTINUE WITH MUD LINE INTERCONNET LINES. CHANGE OUT CHARGE PUMP SUCTION HOSES. CONTINUE WITH GENERAL HOUSEKEEPING AND RIG MP2'S. 0.0 0.0 9/23/2022 00:00 9/23/2022 06:00 6.00 MIRU, MOVE DMOB P GENERAL HOUSEKEEPING AND RIG MP2'S. INSPECT MOVING SYSTEMS ON EACH MODULE. PRIME AND PAINT FLOOR AT PUMP ROOM INTERCONNECTS. CHECK AIR PRESSURE IN MOVING SYSTEM TIRES. 0.0 0.0 9/23/2022 06:00 9/23/2022 12:00 6.00 MIRU, MOVE DMOB P CLEAN AND INSPECT THREADS ON MUD PUMP POP OFF LINES. RIG INVENTORIES. REPAIR BRIDGE CRANE IN PIPESHED AND PREP SKATE RAIL FOR REMOVAL. REBUILD BLIND SHEAR RAMS. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 4/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/23/2022 12:00 9/23/2022 18:00 6.00 MIRU, MOVE DMOB P GENERAL HOUSEKEEPING AND RIG MP2'S. STAGE BLIND SHEAR RAMS IN BOP DECK. LAY DOWN PIPE SKATE RAIL INTO PIPESHED. TROUBLE SHOOT BOILER HOTWELL. CONT WITH REPAIR OF BRIDGE CRANE IN PIPESHED. CHANGE OUT WATER SOFTENER FILTERS. 0.0 0.0 9/23/2022 18:00 9/24/2022 00:00 6.00 MIRU, MOVE DMOB P INSTALL BLIND/SHEAR RAMS, BREAK TOP AND BOTTOM RAM DOORS TO GET PICTURES FOR BWM. CONTINUE TO PRESSURE WASHING EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE TO CHANGE OUT WATER SOFTNER FILTERS. SECURE UPPER PIPESKATE SECTION TO RAILS IN PIPESHED. 0.0 0.0 9/24/2022 00:00 9/24/2022 06:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CUT AND SLIP 88' OF 1.375" DRILL LINE. DISCONNECT KOOMEY HOSES FROM BOP STACK. 0.0 0.0 9/24/2022 06:00 9/24/2022 12:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. C/O STEAM VALVES FOR STEAM DRAGON ISOLATION. BEGIN LAYING MATS ON CD-4 ACCESS ROAD. 0.0 0.0 9/24/2022 12:00 9/24/2022 18:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE LAYING MATS ON CD-4 ACCESS ROAD. PM ON JOHN DEERE MOVING GENS. BEGIN STAGING - ORGANIZING MATS ON CD-2. 0.0 0.0 9/24/2022 18:00 9/25/2022 00:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. TEST RUN NEW TELESCOPING MPD RISER THOUGH ROTARY TABLE. CHANGE OUT DRILLER SIDE BOP BRIDGE CRANE CABLE. CLEAN OUT ALL DRAINS AROUND ROTARY TABLE. CONTINUE CHANGING OUT 2" STEAM VALVES IN PUMP ROOM. 0.0 0.0 9/25/2022 00:00 9/25/2022 06:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. EXPIDITE XO NEEDED FOR CD1-33 TO THE RIG FLOOR. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 5/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/25/2022 06:00 9/25/2022 12:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE TO LAY MATS ON CD-4 ACCESS ROAD. CONTINE TO STAGE MATS AT CD-2. REMOVE BEAVERSLIDE. PRIME AND PAINT MPD RISER. 0.0 0.0 9/25/2022 12:00 9/25/2022 18:00 6.00 MIRU, MOVE DMOB P CONTINUE TO PRESSURE WASH EXTERIOR PARTS OF RIG. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE TO LAY MATS ON CD-4 ACCESS ROAD. CONTINE TO STAGE MATS AT CD-2. INSPECT MOVING SYSTEM HYDRAULICS. 0.0 0.0 9/25/2022 18:00 9/26/2022 00:00 6.00 MIRU, MOVE DMOB P NIPPLE DOWN BOPE STACK AND REMOVE FROM BOP DECK. CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. 0.0 0.0 9/26/2022 00:00 9/26/2022 06:00 6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. ORGANIZE THE PAD. 0.0 0.0 9/26/2022 06:00 9/26/2022 12:00 6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE TO LAY MATS ON CD-4 ACCESS ROAD. MODIFY WATER SOFTENER BASE STAND. STAGE COMPLEX AXLE AT CD-1. 0.0 0.0 9/26/2022 12:00 9/26/2022 18:00 6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE CLEANING OUTSIDE OF THE RIG. CONTINUE TO LAY MATS ON CD-4 ACCESS ROAD. PREP NEW SUB TIRES FOR INSTALL. PAINT NEW WATER SOFTENER STAND. 0.0 0.0 9/26/2022 18:00 9/27/2022 00:00 6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE CLEANING OUTSIDE OF THE RIG. BEGIN TO LAY MATS ON MAIN ROAD TO AIRPORT RUNWAY. CONTINUE TO PAINT NEW WATER SOFTENER STAND. 0.0 0.0 9/27/2022 00:00 9/27/2022 06:00 6.00 MIRU, MOVE DMOB P CONTINUE HOUSEKEEPING AND MP2'S AROUND THE RIG. CONTINUE TO LAY MATS ON MAIN ROAD TO AIRPORT RUNWAY. BLOW DOWN STEAM AND WATER TO THE ROCKWASHER. DISCONNECT ROCKWASHER FROM THE RIG. PREP LOCATION FOR SPLITTING THE RIG APART. 0.0 0.0 9/27/2022 06:00 9/27/2022 12:00 6.00 MIRU, MOVE DMOB P PREP SUB FOR SKIDDING RIG FLOOR. PREP PITS FOR RIG MOVE. FINISH PREP WORK ON ROCKWASHER FOR MOVING. RELOCATE WASHER/DRYER AND WATER SOFTNER IN BOILER ROOM. 0.0 0.0 9/27/2022 12:00 9/27/2022 15:45 3.75 MIRU, MOVE DMOB P RELOCATE WASHER/DRYER AND WATER SOFTNER IN BOILER ROOM. PREP PIPSHED STAIRS FOR REMOVAL. CONTINUE HOUSEKEEPING AROUND THE RIG. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 6/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/27/2022 15:45 9/27/2022 18:00 2.25 MIRU, MOVE DMOB P SWAP FROM CAT POWER TO COLD STARTS. BLOW DOWN WATER AND STEAM. DISCONNECT AIR AT ALL INTERCONNECTS. UNPLUG ELECTICAL INTERCONNECTS ON ALL MODS. 0.0 0.0 9/27/2022 18:00 9/27/2022 20:00 2.00 MIRU, MOVE DMOB P BREAK APART ALL INTERCONNECTS. PREP ALL MODS FOR PULLING APART. RAISE ALL LANDINGS AND PICK UP OUTSIDE AROUND RIG. 0.0 0.0 9/27/2022 20:00 9/27/2022 20:30 0.50 MIRU, MOVE DMOB P MOVE PIPESHED TO STAGING AREA AT ENTRANCE TO THE PAD. SIMOPS - REMOVE ROCKWASHER FROM COURT YARD AND STAGE AT ENTRANCE TO THE PAD. - SET MOTOR COMPLEX ON SUSPENSION. 0.0 0.0 9/27/2022 20:30 9/27/2022 21:15 0.75 MIRU, MOVE DMOB P MOVE MOTOR COMPLEX AND STAGE FOR TRANSPORT TO CD1. SIMOPS - SET PUMP COMPLEX ON SUSPENSION. 0.0 0.0 9/27/2022 21:15 9/27/2022 21:30 0.25 MIRU, MOVE DMOB P MOVE PUMP COMPLEX AND STAGE FOR TRANSPORT TO CD1. SIMOPS - SET PIT COMPLEX ON SUSPENSION. 0.0 0.0 9/27/2022 21:30 9/27/2022 22:00 0.50 MIRU, MOVE DMOB P MOVE PIT COMPLEX AND STAGE FOR TRANSPORT TO CD1. SIMOPS - PICKUP MATS FROM UNDER RIG. 0.0 0.0 9/27/2022 22:00 9/27/2022 23:30 1.50 MIRU, MOVE DMOB P SKID RIG FLOOR. SIMOPS - INSTALL SUB TOW TONGUE. 0.0 0.0 9/27/2022 23:30 9/28/2022 00:00 0.50 MIRU, MOVE DMOB P RAISE AND SECURE SUB STOMPERS. 0.0 0.0 9/28/2022 00:00 9/28/2022 01:00 1.00 MIRU, MOVE DMOB P PULL SUB OFF WELL AND STAGE FOR TIRE REMOVAL, STAIR REMOVAL, AND TRANSPORT TO CD1. 0.0 0.0 9/28/2022 01:00 9/28/2022 06:00 5.00 MIRU, MOVE DMOB P PICK UP REMAINING MATS FROM UNDER RIG. SEND MATS TO BE USED AT CD2-4 INTERSECTION. CLEAN AND ORGANIZE AROUND WELLHEAD. REMOVE I BEAMS & CURTAINS ON ODS FOR TIRE REMOVAL. 0.0 0.0 9/28/2022 06:00 9/28/2022 12:00 6.00 MIRU, MOVE DMOB P CHANGE OUT BOTH ODS SETS OF SUB TIRES AS PER AFC REP. GREASE RIG FLOOR SKID RAILS. CONTINUE TO LAY MATS AT CD2-4 INTERSECTION. 0.0 0.0 9/28/2022 12:00 9/28/2022 20:00 8.00 MIRU, MOVE DMOB P CONTINUE CHANGING OUT SUB ODS TIRES. CONTINUE TO LAY MATS AT CD2-4 INTERSECTION. STAGE PLYWOOD AT INTERSECTION NEAR RUNWAY. P/U TOOLS AROUND WHEEL WELL TO SUB. 0.0 0.0 9/28/2022 20:00 9/28/2022 21:00 1.00 MIRU, MOVE DMOB P REMOVE PIPESHED STAIRS VIA CRANE OPERATION. 0.0 0.0 9/28/2022 21:00 9/29/2022 00:00 3.00 MIRU, MOVE DMOB P INSTALL SUB WHEEL WELL I BEAM. HANG WHEEL WELL CURTAINS. FUEL COLD STARTS/AIR HEATERS ON ALL MODULES. CONT PICKING UP/ORGANIZING PAD. PREP/ORGANIZE EQUIPMENT FOR SHIPPING TO CD1. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 7/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/29/2022 00:00 9/29/2022 06:00 6.00 MIRU, MOVE DMOB P STAGE PLYWOOD ALONG ROUTE TO CD1. CONTINUE TO STAGE 40' MATS AT APRON ON CD1. CONTINUE TO ORGANIZE EQUIPMENT FOR SHIPMENT TO CD1. 0.0 0.0 9/29/2022 06:00 9/29/2022 12:00 6.00 MIRU, MOVE DMOB P CLEAN ELECTRICAL PLUGS AND CAPS IN PITS INTERCONNECT. MONITOR/METER COLD START FUEL USAGE FOR RIG MOVE. STRATEGICALLY LAY PLYWOOD ON CD4 ACCESS ROAD TOWARDS GUARDSHACK. 0.0 0.0 9/29/2022 12:00 9/29/2022 18:00 6.00 MIRU, MOVE DMOB P CONTINUE TO ORGANIZE PAD FOR EQUIPMENT MOVEMENT TO CD1. CONTINUE TO CLEAN ELECTICAL PLUGS AND CAPS IN PITS INETERCONNECT. 0.0 0.0 9/29/2022 18:00 9/30/2022 00:00 6.00 MIRU, MOVE DMOB P CONTINUE TO LAY PLAYWOOD FROM CD4 ACCESS ROAD TO GUARDSHACK. DOUBLE MAT PIPELINE CROSSING AT ENTRANCE TO THE RUNWAY. MOVE CELLAR WALLS FOR 10 FOOT CENTERS. 0.0 0.0 9/30/2022 00:00 9/30/2022 06:00 6.00 MIRU, MOVE DMOB P CONT W/ PREP FOR RIG MOVE, STAGE & LAY RIG MATTS AS DIRECTED. LOCATE XO'S & SIDE ENTRY SUBS FOR UPCOMING WELL WORK, ADJUST INNER CONNECT CUSHIONS THROUGHOUT MODULES, ORGANIZE FMC WELLHEAD COMPONETS. 0.0 0.0 9/30/2022 06:00 9/30/2022 09:00 3.00 MIRU, MOVE DMOB P HOOK OP SOWS TO PUMP AND POWER MODULES, MOVE POWER MODULE DOWN TO PAD TO PREP FOR DRIVING OVER GROUND DISTURBANCE SENSORS ONCE RIG MOVE HAS BEGUN. SIMOPS- CLEAN AND CLEAR ALL DEBRIS AROUND CD4 PAD/CD4- 597 WELL 0.0 0.0 9/30/2022 09:00 9/30/2022 09:30 0.50 MIRU, MOVE DMOB P DRIVE OVER GROUND DISTURBANCE SENSORS WITH MODULES FOR CPAI. 0.0 0.0 9/30/2022 09:30 9/30/2022 11:00 1.50 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES FROM CD4 T/ GUARD SHACK @ CD4 ACCESS ENTRANCE, HOLD THERE FOR FLIGHT TRAFFIC 0.0 0.0 9/30/2022 11:00 9/30/2022 12:00 1.00 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES FROM CD4 T/ GUARD SHACK @ CD4 ACCESS ENTRANCE, HOLD THERE FOR FLIGHT TRAFFIC 0.0 0.0 9/30/2022 12:00 9/30/2022 13:00 1.00 MIRU, MOVE MOB P HOLD AT THE END OF THE AIR STRIP FOR LIGHTS TO BE REMOVED. 0.0 0.0 9/30/2022 13:00 9/30/2022 14:00 1.00 MIRU, MOVE MOB P PROCEED DOWN THE AIR STRIP TO TARMAC, ONCE @ TARMAC UNHOOK SOWS F/ PUMP/POWER MODULES AND RETURN TO CD4 TO RETRIEVE PIPE/PIT MODULES 0.0 0.0 9/30/2022 14:00 9/30/2022 14:30 0.50 MIRU, MOVE MOB P DRIVE OVER GROUND DISTURBANCE SENSORS WITH MODULES FOR CPAI 0.0 0.0 9/30/2022 14:30 9/30/2022 16:00 1.50 MIRU, MOVE MOB P MOVE PIPE/PITS MOULES FROM CD4 TO CDI TARMAC 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 8/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 9/30/2022 16:00 9/30/2022 16:30 0.50 MIRU, MOVE MOB P RELEASE SOWS FROM PIPE/PIT MODULES, HOOK SOWS UP TO PUMP/POWER MODULES 0.0 0.0 9/30/2022 16:30 9/30/2022 18:00 1.50 MIRU, MOVE MOB P MOVE PUMP/POWER MODULES FROM TARMAC TO CD1 PAD PAST CD1-33, RELASE SOWS TO RETRIEVE/ MOVE PIPE/PIT MODULES ONTO CD1 PAD. 0.0 0.0 9/30/2022 18:00 9/30/2022 19:00 1.00 MIRU, MOVE MOB P CONT MOVING & STAGE PIPE SHED MODULE @ CD1, LEAVE CLEARANCE FOR LSR(HOTOIL T/ RIG UP ON WELL). 0.0 0.0 9/30/2022 19:00 9/30/2022 20:30 1.50 MIRU, MOVE MOB P HOOK UP NES TRUCK T/ SUB MODULE @ CD4 & TRANSPORT THE SUB BASE ACROSS CPAI WEIGHT SENSORS FOR LOAD RATINGS AS PER CPAI. 0.0 0.0 9/30/2022 20:30 10/1/2022 00:00 3.50 MIRU, MOVE MOB P BEGIN TRANSPORT OF SUB MODULE W/ NES TRUCKS F/ CD4 T/ ACCESS ROAD FOR CD2 & RUNWAY 0.0 0.0 10/1/2022 00:00 10/1/2022 01:00 1.00 MIRU, MOVE MOB P CONT W/ TRANSPORT OF SUB MODULE W/ NES TRUCKS F/ CD4 T/ ACCESS ROAD FOR CD2 & RUNWAY. 0.0 0.0 10/1/2022 01:00 10/1/2022 01:45 0.75 MIRU, MOVE MOB P TROUBLESHOOT THE SUB MODULES STEARING CONTROL BOX FOR BOTH STEARING RAMS, ( OBSERVED BROKEN WELDS ON THE MAIN STEARING UNIT, DOESNT ALLOW THE STEARING RAMS TO TURN & FUNCTION THE REAR RIG TIRES ON THE SUB). 0.0 0.0 10/1/2022 01:45 10/1/2022 03:00 1.25 MIRU, MOVE MOB P PJSM, CONT MOVING THE SUB MODULE F/ CD2 ACCESS ROAD TO RUNWAY 0.0 0.0 10/1/2022 03:00 10/1/2022 03:30 0.50 MIRU, MOVE MOB P WHILE PULLING ONTO TANSITION MATS & DOUBLE MATS @ THE BRIDGE CROSSING NES SNAPPED A CABLE USED TO CONNECT THE TRUCKS WITH, AFTER X4 ATTEMPTS WE WERE SUCCESSFULL ON CROSSING THE TRANSITION MATS ON THE BRIDGE 0.0 0.0 10/1/2022 03:30 10/1/2022 04:00 0.50 MIRU, MOVE MOB T CONT TRANSPORTING THE SUB MODULE ONTO THE RUNWAY & STAGE IN THE MIDDLE TO KEEP CLEAR PATHS FOR TRAFFIC TO PASS. 0.0 0.0 10/1/2022 04:00 10/1/2022 06:00 2.00 MIRU, MOVE MOB T SECURE THE SUB MODULE ON PLYWOOD & PREP FOR REPAIR ON STEARING CONTROL BOX 0.0 0.0 10/1/2022 06:00 10/1/2022 08:30 2.50 MIRU, MOVE MOB T REMOVE STEERING CONTROL BOX AND CROSS BEAM FROM SUB/ SEND TO THE SHOP FOR WELDERS TO REPAIR, MOVE ROCKWASHER FROM TARMAC TO CD1 PAD. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 9/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/1/2022 08:30 10/1/2022 12:00 3.50 MIRU, MOVE MOB T FUEL ALL MODULES, CLEAN/CLEAR ACCUMULATED TRASH FROM ALL MODULES. MOVE 40' STARTING MAT FOR RIG MAT LAYOUT, P/U PLYWOOD AT CD2 INTERSECTION/STACK NEXT OTHER BUNDLE 0.0 0.0 10/1/2022 12:00 10/1/2022 18:00 6.00 MIRU, MOVE MOB T REMOVE MATS LAYED OUT FOR SUB TO LAY HERCULITE, LAY HERCULITE FOR SUB FOOTPRINT ONCE ON LOCATION, SET STARTING MAT IN PLACE THEN LAY ONLY 2 MATS IN FRONT TO SAVE ROOM FOR CENTERING UP W/ SUB STRUCTURE, LAY OUT MATS FOR PUMP/PIT MODULES, PREP FOR STAGING TRANSITIONS ONTO RIG MATS 0.0 0.0 10/1/2022 18:00 10/1/2022 20:30 2.50 MIRU, MOVE MOB T PREP ALL TOOLS & RIGGING IN SUB MODULE WHEEL WELL FOR INSTALL ON STEARING CONTROL ASSEMBLY, FINISH FAB WORK ON STEARING BOX CONTROL SYSTEM & TRANSPORT F/ CD2 TO RUNWAY FOR INSTALL 0.0 0.0 10/1/2022 20:30 10/2/2022 00:00 3.50 MIRU, MOVE MOB T MOUNT & PIN IN PLACE STEARING CONTROL BOX, STEARING RAMS, & TRAVEL ASSEMBLY, CONNECT HYDRAULIC LINES & FUNCTION TEST(ALL WORKED GOOD). SIMOP MOVE RIG MATS AWAY FROM CD1-33/WD04 TO LEVEL & PREP PAD FOR SUB BASE RIG MATS, REPOSITION RIG MATS IN PLACE & CONTINUE LAYING RIG MATS FOR REMAINING MODULES. 0.0 0.0 10/2/2022 00:00 10/2/2022 00:30 0.50 MIRU, MOVE MOB T PICK UP ALL TOOLS AND EQUIPMENT USED FOR WORK CONDUCTED ON THE STEARING BOX INSTALL. RAISE RIG ON SUSPENSION AND PICKUP PLYWOOD FROM UNDER SUB BASE. 0.0 0.0 10/2/2022 00:30 10/2/2022 02:00 1.50 MIRU, MOVE MOB P TRANSPORT SUB BASE FROM RUNWAY TO CD1 TARMAC. SCRATCH AREA INFRONT OF RUNWAY ACTUATION ARMS AND PREP MATS FOR SUB. 0.0 0.0 10/2/2022 02:00 10/2/2022 04:30 2.50 MIRU, MOVE MOB P TRANSPORT SUB DOWN LAKE VIEW DRIVE AND LINE UP FOR SPOTTING OVER CD1-33A. 0.0 0.0 10/2/2022 04:30 10/2/2022 05:15 0.75 MIRU, MOVE MOB P SPOT SUB OVER CD1-33A. WITNESSED BY CD1 PAD OPERATOR. 0.0 0.0 10/2/2022 05:15 10/2/2022 06:00 0.75 MIRU, MOVE MOB P LOWER STOMPERS. SIMOPS - REMOVE SUB TOW TONGUE. 0.0 0.0 10/2/2022 06:00 10/2/2022 10:30 4.50 MIRU, MOVE MOB P CONT TO LOWER STOMPERS - ISSUES WITH ADJACENT PIPELINES AND NEEDING TO REMOVE DIRT FOR PROPER STOMPER PLACEMENT. SIMOPS - SET MATS FOR PIPESHED, ROCKWASHER, AND POWER MODULE. 0.0 0.0 10/2/2022 10:30 10/2/2022 11:00 0.50 MIRU, MOVE MOB P SKID RIG FLOOR. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 10/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/2/2022 11:00 10/2/2022 12:00 1.00 MIRU, MOVE MOB P SPOT THE PIT MODULE. 0.0 0.0 10/2/2022 12:00 10/2/2022 13:00 1.00 MIRU, MOVE MOB P SPOT THE PUMP MODULE 0.0 0.0 10/2/2022 13:00 10/2/2022 14:00 1.00 MIRU, MOVE MOB P SPOT THE POWER MODULE 0.0 0.0 10/2/2022 14:00 10/2/2022 16:00 2.00 MIRU, MOVE MOB P SET ROCKWASHER. RELEASE BED TRUCK AND SPOT WITH DOZER DUE TO TIGHT CLEARANCES. 0.0 0.0 10/2/2022 16:00 10/2/2022 17:00 1.00 MIRU, MOVE MOB P SPOT THE PIPESHED. 0.0 0.0 10/2/2022 17:00 10/2/2022 18:00 1.00 MIRU, MOVE MOB P ELECTRICIAN PLUGGING IN ELECTICAL AT ALL MODULE INTERCONNECTS. ASSIST IN PICKING UP PLYWOOD ALONG THE CD-4 AND 5 ROADS. SECURE ALL LANDINGS AROUND THE RIG. START HOOKING UP ALL INTERCONNECTS. 0.0 0.0 10/2/2022 18:00 10/2/2022 22:00 4.00 MIRU, MOVE MOB P CONTINUE TO HOOK UP ALL INTERCONNECTS, INTRODUCE STEAM, WATER AND AIR TO ALL MODULES, STAGE 13 5/8" BOPE COMPONENTS AT BOP DECK BRIDGE CRANE PICKING AREA. SWAP POWER FROM JOHN DEERE COLD STARTS TO 3512 CAT. 0.0 0.0 10/2/2022 22:00 10/3/2022 00:00 2.00 MIRU, MOVE MOB P REMOVE MATS LAID FOR ACB BOXES TO PLACE HERCULITE UNDER THEM. P/U TOOLS AND RIGGING USED TO CONNECT INTERCONNECTS. ESTABLISH STEAM AND WATER THROUGHOUT ALL MODULES EXCEPT SUB (WAITING ON WATER). 0.0 0.0 10/3/2022 00:00 10/3/2022 00:30 0.50 MIRU, MOVE SFTY P PJSM W/ CRANE OPERATOR AND RIG CREW ON SETTING PIPESHED STAIRS. 0.0 0.0 10/3/2022 00:30 10/3/2022 01:00 0.50 MIRU, MOVE MOB P CONT WITH RIG ACCEPTANCE CHECKLIST. INSTALL LOWER CELLAR WIND WALLS. HERCULITE AROUND LOWER CELLAR WALLS. SIMOPS - INSTALL PIPESHED STAIRS AND LANDINGS. 0.0 0.0 10/3/2022 01:00 10/3/2022 03:45 2.75 MIRU, MOVE MOB P RIG UP PIPESKATE GUIDE RAIL AND SPOOL UP SKATE CABLE. THAW STEAM HEATER ON RIG FLOOR AND VAC LINES IN THE PIT COMPLEX. CONTINUE TO LOAD MATERIAL AT CD4 FOR TRANSPORT TO CD1. CONTINUE TO INSTALL PIPESHED STAIRS AND LANDINGS. 0.0 0.0 10/3/2022 03:45 10/3/2022 06:00 2.25 MIRU, MOVE MOB P EXPIDITE 13 5/8" BOPE TO BOP DECK AND ASSEMBLE. SIMOPS - CONTINUE TO INSTALL PIPESHED STAIRS AND LANDINGS. 0.0 0.0 10/3/2022 06:00 10/3/2022 12:00 6.00 MIRU, MOVE MOB P CONTINUE TO BUILD 13 5/8" BOPE. SCOPE OUT CELLAR WIND WALLS TO GAIN CLEARANCE IN CELLAR. PREP PITS TO TAKE ON FLUID. FUEL PUMP, POWER, AND PIPE MODULES. 0.0 0.0 10/3/2022 12:00 10/3/2022 14:00 2.00 MIRU, MOVE MOB P FINISH TORQING BOPE VIA SWEENEY TORQUE WRENCH. NIPPLE UP CHOKE AND KILL HCR'S. SIMOPS - INSTALL BEAVERSLIDE 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 11/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/3/2022 14:00 10/3/2022 18:00 4.00 MIRU, MOVE MOB P CONNECT KOOMEY LINES TO BOPE, LOAD 4" DP INTO PIPE SHED, STAGE AND PREP 2" HIGH PRESSURE EQUIPMENT- HOSES, CHIKSANS, 90'S, LO- TORQUES, ETC. IN CELLAR FOR KILLING THE WELL, CLEAN/ORGANIZE BOP DECK POST RIG MOVE/ NIPPLE UP BOPE. CLEAN/ORGANIZE RIG FLOOR. TAKE ON 9.8 PPG BRINE TO PITS 3,4, AND 5. 0.0 0.0 10/3/2022 18:00 10/3/2022 21:00 3.00 MIRU, MOVE MOB P LOAD/STRAP/TALLY 135 JTS OF 4" XT -39 14 LBS IN PIPESHED, CONDUCT DERRICK INSPECTION, STAGE 3.5"/4.5" TEST JTS & 4.5" LANDING JT IN PIPESHED, MOVE RIG MATS AT TENT TO CLEAR TRAVEL PATH TO BACK OF RIG, STAGE BULL RAIL INFRONT OF PUMP MODULE, PREP RIG MATS FOR PUMP HOUSE/MAG-TEC/TANK FARM/ETC. 0.0 0.0 10/3/2022 21:00 10/4/2022 00:00 3.00 MIRU, MOVE MOB P SPOT ROCKWASHER CUTTINGS TANK, SMOKE SHACK, PORTABLE HEATER F/ MAG-TEC VAC UNIT, R/U INJECTION LINE IN LOWER CELLAR, HARD IRON ALIGNMENT TO KILL THE WELL & MONITOR VIA TOTCO/CHART RECORDER. 0.0 0.0 10/4/2022 00:00 10/4/2022 03:00 3.00 MIRU, MOVE MOB P GREASE CHOKE MANIFOLD AND HCR VALVES FOR UPCOMING BOPE TEST. LAY HERCULITE AND BURMING FOR TANK FARM. STAGE UPRIGHTS FOR THE TANK FARM. STAGE CHOKE SKID. MOBILIZE XO'S TO THE RIG FLOOR. FINISH WITH RIG UP ON CD1-33 WD-04 TO CIRCULATE KWB THROUGH THE CHOKE SKID TO THE TIGER TANK. 0.0 0.0 10/4/2022 03:00 10/4/2022 06:00 3.00 MIRU, MOVE MOB P PLACE INTERCONNECT DUCK PONDS BETWEEN MODULES. BLOW DOWN INJECTION LINE, WORK ON MP2'S. ASSIST MAGTEC WITH RIG UP AS NEEDED. ASSIST HARLINE CREW RIGGING UP CHOKE HOUSE TO THE IA. 0.0 0.0 10/4/2022 06:00 10/4/2022 12:00 6.00 MIRU, MOVE MOB P INSPECT RIG UP FOR WELL KILL OPS, CONT WORKING ON MP2'S, PREP/PRIME MUD PUMPS FOR USE, BLOW AIR TO TIGER TANK, TAKE ON BRINE TO PITS 3-7, SERVICE PIPE SKATE, SERVICE ST-100, LOCATE 4 1/2" HANDLING EQUIPMENT. 0.0 0.0 10/4/2022 12:00 10/4/2022 13:00 1.00 MIRU, WELCTL OWFF P RIG UP TO BLEED OA TO TIGER TANK, ONCE DHD REP. ON LOCATION OPENED UP OA TO BLEED TANK, BLEW DOWN LINES AND RIGGED BACK UP TO IA. 0.0 0.0 10/4/2022 13:00 10/4/2022 13:30 0.50 MIRU, WELCTL SFTY P HOLD PJSM ON DISPLACING DIESEL TO 9.8 PPG VIS BRINE - NaCl. 0.0 0.0 10/4/2022 13:30 10/4/2022 14:00 0.50 MIRU, WELCTL RURD P PULL TREE CAP PER FMC REP., CONFIRM TURN COUNT ON EUE CROSSOVER PRIOR TO PULLING BPV, PULL BPV PER FMC. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 12/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/4/2022 14:00 10/4/2022 15:00 1.00 MIRU, WELCTL SEQP P RIG UP/FLUID PACK LINES TO TIGER TANK, TEST ALL SURFACE LINES AND IA LINES TO 2000 PSI (GOOD) 0.0 0.0 10/4/2022 15:00 10/4/2022 16:00 1.00 MIRU, WELCTL DISP P DIPLACE WELL TO 9.8 PPG VIS BRINE - NaCl THROUGH TUBING, DIVERTING WELL FLUID RETURNS TO TIGER TANK @ 6 BPM, 1000 PSI, 175 BBLS PUMPED ( 1758 TOTAL STROKES). 0.0 0.0 10/4/2022 16:00 10/4/2022 16:30 0.50 MIRU, WELCTL OWFF P SHUT IN TUBING/ANNULUS TO MONITOR WELL F/ 30 MIN. (STATIC). 0.0 0.0 10/4/2022 16:30 10/4/2022 17:30 1.00 MIRU, WELCTL CIRC P PUMP ANOTHER 50 BBLS (500 TOT. STRKS) TO TIGER TANK, SWAP RETURNS OVER TO THE RIG AND CIRC BOTTOMS UP WITH 6 BPM, 700 PSI, 38% F/O. 1755 TOTAL STROKES 0.0 0.0 10/4/2022 17:30 10/4/2022 18:45 1.25 MIRU, WELCTL OWFF P SHUT IN TUBING AND IA & OWFF F/30 MIN(STATIC) AS PER CPAI REP/FMC REP. 0.0 0.0 10/4/2022 18:45 10/4/2022 20:00 1.25 MIRU, WHDBOP MPSP P R/D PUMP IN SUB & INJECTION LINE F/ TBG, SET BPV AS PER FMC REP, R/U INJECTION LINE & CHART RECORDER T/ IA & PREP T/ TEST BPV 0.0 0.0 10/4/2022 20:00 10/4/2022 20:45 0.75 MIRU, WHDBOP PRTS P TEST BPV TO 1500 PSI IN THE DIRECTION OF FLOW FOR 10 CHARTED MIN. WITNESSED BY CPAI REP/FMC REP. 0.0 0.0 10/4/2022 20:45 10/4/2022 21:45 1.00 MIRU, WHDBOP RURD P BLOW/RIG DWN ALL SURFACE EQUIPMENT & TEST EQUIPMENT USED FOR TESTING, CLEAN & CLEAR LOWER CELLAR, STAGE TOOLS & RIGGING F/ NIPPLE DWN PRODUCTION TREE & SPEED HEAD ASSEMBLY. 0.0 0.0 10/4/2022 21:45 10/4/2022 22:15 0.50 MIRU, WHDBOP NUND P PJSM, INSTALL EUE XO INTO PRODUCTION TREE, P/U 4.5" TEST JT WITH TOP DRIVE, M/U TO TOP OF PRODUCTION TREE, BREAK CONNECTION ON SPEED HEAD ADAPTOR AS PER FMC SOP. 0.0 0.0 10/4/2022 22:15 10/5/2022 00:00 1.75 MIRU, WHDBOP NUND P BREAK SPEED HEAD ADAPTOR CONNECTION W/ TOP DRIVE 8K P/U W/ FREE TRAVEL, SET BACK DWN SWAP RIGGING, P/U & L/D PRODUCITON TREE, CLEAN HANGER PROFILE AS PER FMC REP, INSTALL BLANKING PLUG W/ 10 1/4 TURNS (RIGHT) & PLUG R/T 9 TURNS (LEFT), OBTAIN RKB'S UPPER L/D=34.22'/ LOWER L/D=36.16'. 0.0 0.0 10/5/2022 00:00 10/5/2022 02:00 2.00 MIRU, WHDBOP NUND P MOBILIZE SPEED HEAD ADAPTOR TO THE BOP DECK AND NIPPPLE UP ONTO THE WELL HEAD. SEPERATE THE PRODUCTION TREE/SPEED HEAD ADAPTOR AND STAGE FOR SHIPMENT. TORQUE UP NEW SPEED HEAD ADAPTOR AS PER FMC REP. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 13/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/5/2022 02:00 10/5/2022 10:30 8.50 MIRU, WHDBOP NUND P NIPPLE UP 13 5/8" 5K BOPE. CHANGE CONFIGURATION OF KOOMEY LINES. ADD 18" SPACER SPOOL, NIPPLE UP CHOKE AND KILL LINES. NIPPLE UP BELL NIPPLE. TORQUE ALL CONNECTIONS WITH SWEENY WRENCH. OBTAIN RKB'S. 0.0 0.0 10/5/2022 10:30 10/5/2022 13:30 3.00 MIRU, WHDBOP RURD P R/U TESTING EQUIPMENT. SHELL TEST BOPE (GOOD) 0.0 0.0 10/5/2022 13:30 10/5/2022 19:00 5.50 MIRU, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 5,000 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 4" TEST JT TEST ANNULAR, 2 7/8" X 5 1/2" UPR, 2 7/8" X 5 1/2" LPR, W/ 4 1/2" TEST JT TEST 2 7/8" X 5 1/2" UPR & 2 7/8" X 5 1/2" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 4" FOSV, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3050 PSI. MANIF. = 1550 PSI. ACC = 1750 PSI AFTER ALL FUNCTIONS ON BOTTLES, 09 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 68 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 10 SEC. UPR = 07 SEC. BLIND / SHEARS = 16 SEC. LPR = 07 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC, X6 BACK UP NITROGEN BOTTLES 1983 PSI, TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP AUSTIN McLEOD WITNESS THE TEST. 0.0 0.0 10/5/2022 19:00 10/5/2022 20:00 1.00 MIRU, WHDBOP RURD P BLOW DOWN AND RIG DOWN TESTING EQUIPMENT. 0.0 0.0 10/5/2022 20:00 10/5/2022 21:45 1.75 MIRU, WHDBOP RURD P INSTALL BOPE RISER. INSTALL MOUSEHOLE. SIMOPS - MOBILIZE DOYON CASINGS 4½ HANDLING EQUIPMENT TO THE RIG FLOOR. CHANGE ELEVATORS. 0.0 0.0 10/5/2022 21:45 10/5/2022 22:00 0.25 MIRU, WHDBOP MPSP P P/U TEE BAR AND PULL BPV AS PER FMC REP. 0.0 0.0 10/5/2022 22:00 10/5/2022 23:30 1.50 SLOT, RPCOMP PULL P M/U 4½ LANDING JT & XO AND ENGAGE TUBING HANGER. M/U THE TOP DRIVE & BACK OUT LOCK DOWNS. OBSERVE 108K P/U WEIGHT TO UNSEAT THE HANGER. 89K FREE UP WT. 4,415.0 4,410.0 10/5/2022 23:30 10/6/2022 00:00 0.50 SLOT, RPCOMP CIRC P CIRCULATE A B/U STAGING PUMPS UP TO 6 BPM, ICP - 230 FCP - 360, 35% F/O. 4,410.0 4,410.0 10/6/2022 00:00 10/6/2022 00:15 0.25 SLOT, RPCOMP CIRC P CIRCULATE A B/U STAGING PUMPS UP TO 6 BPM, ICP - 230 FCP - 360, 35% F/O. 1005 TOTAL STKS PUMPED. 4,410.0 4,410.0 10/6/2022 00:15 10/6/2022 00:30 0.25 SLOT, RPCOMP OWFF P OWFF (STATIC) 4,410.0 4,410.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 14/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/6/2022 00:30 10/6/2022 01:45 1.25 SLOT, RPCOMP PULL P DRAIN BOP STACK. PULL HANGER TO FLOOR W/ 89K UP WT F/ 4410' MD T/ 4,380' MD. L/D HANGER AND LANDING JOINT. B/D TD. 4,410.0 4,380.0 10/6/2022 01:45 10/6/2022 07:00 5.25 SLOT, RPCOMP PULL P POOH W/ 4½ 12.6# L-80 IBTM TUBING FROM 4,380' MD. UP WT - 89K. MONITOR DISP VIA TT. 102 JTS TOTAL LAID DOWN. 4,380.0 0.0 10/6/2022 07:00 10/6/2022 09:30 2.50 SLOT, RPCOMP RURD P R/D AND L/D DOYON CASING EQUIPMENT. SIMOPS - MOBILIZE SCRAPER BHA TO THE RIG FLOOR. CLEAN AND CLEAR RIG FLOOR. 0.0 0.0 10/6/2022 09:30 10/6/2022 10:00 0.50 SLOT, PLUG RURD P SET WEAR BUSHING PER FMC REP. 1.8" L, 9" ID, 10.80" OD. 0.0 0.0 10/6/2022 10:00 10/6/2022 10:15 0.25 SLOT, PLUG SFTY P PJSM ON P/U SCRAPER BHA. 0.0 0.0 10/6/2022 10:15 10/6/2022 11:00 0.75 SLOT, PLUG BHAH P M/U BAKER SCRAPER BHA AS PER BAKER HAND T/ 20' MD. 0.0 20.0 10/6/2022 11:00 10/6/2022 16:00 5.00 SLOT, PLUG TRIP P RIH W/ SCRAPER BHA ON 4" DP. PICKING UP DP 1X1 FROM THE PIPESHED F/ 20' MD T/ 4,275' MD. S/O WT - 99K. MONITOR DISP VIA TT. 20.0 4,275.0 10/6/2022 16:00 10/6/2022 16:45 0.75 SLOT, PLUG PMPO P KELLY UP T/ STAND 45, CIRC. B/U WHILE RECIPROCATING FULL STAND F/ 4,275' MD TO 4,180' MD, RACK BACK STD 45, KELLY UP T/ STD 44 CIRC. B/U WHILE RECIPROCATING FULL STAND TO 4,086' MD @ 600 GPM, 50 RPM, 1623 PSI, 1K TQ, 52% F/O. 2544 TOT. STRKS. P/U WT= 97K, S/O WT=96K. 4,275.0 4,086.0 10/6/2022 16:45 10/6/2022 17:00 0.25 SLOT, PLUG OWFF P OWFF (STATIC) 4,086.0 4,086.0 10/6/2022 17:00 10/6/2022 20:00 3.00 SLOT, PLUG TRIP P BLOW DOWN TOP DRIVE. POOH F/ 4,086' MD TO 20' MD. L/D SCRAPER BHA. MONITOR DISP VIA TT. 4,086.0 0.0 10/6/2022 20:00 10/6/2022 21:30 1.50 SLOT, PLUG ELOG P SPOT AND R/U SLMB E-LINE. SIMOPS - CLEAN AND CLEAR RIG FLOOR. 0.0 0.0 10/6/2022 21:30 10/6/2022 22:30 1.00 SLOT, PLUG ELOG P PJSM, EXPIDITED E-LINE TOOLS TO THE RIG FLOOR. HANG E-LINE SHEAVES, AND M/U E-LINE TOOLS AS PER SLMB REP. 0.0 0.0 10/6/2022 22:30 10/7/2022 00:00 1.50 SLOT, PLUG ELOG T TROUBLESHOOT BRAKE BAND ON SPOOL UNIT. 0.0 0.0 10/7/2022 00:00 10/7/2022 01:30 1.50 SLOT, PLUG ELOG T CHANGE OUT SPOOLER BRAKE BAND. RESPOOL ~1000' WIRE. 0.0 0.0 10/7/2022 01:30 10/7/2022 04:00 2.50 SLOT, PLUG ELOG P RIH WITH ISOLATION SCANNER TO 4,230' MD. MONITOR WELLBORE VIA TT. 0.0 0.0 10/7/2022 04:00 10/7/2022 07:00 3.00 SLOT, PLUG ELOG P L/D ISOLATION SCANNER RUNNING TOOLS. PICK UP & M/U SLMB RUNNING TOOLS FOR CIBP. 0.0 0.0 10/7/2022 07:00 10/7/2022 09:00 2.00 SLOT, PLUG ELOG P RIH W/ CIBP VIA E-LINE. SET AT 4,223' MD. POOH WITH E-LINE. 0.0 0.0 10/7/2022 09:00 10/7/2022 10:00 1.00 SLOT, PLUG ELOG P R/D AND L/D E-LINE TOOLS AND EQUIPMENT.. 0.0 0.0 10/7/2022 10:00 10/7/2022 10:30 0.50 SLOT, PLUG ELOG P CLOSE BLIND RAMS AND TEST CIBP TO 2500 PSI FOR 10 CHARTED MINUTES (GOOD) 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 15/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/7/2022 10:30 10/7/2022 12:00 1.50 SLOT, PLUG WAIT P WAIT ON ORDERS FROM TOWN WHILE ANALYZE LOGS FROM E-LINE ISOLATION SCANNER RUN. - SIMOPS - HOUSEKEEPING AND COMPLETE DOYON MP-2 WORK ORDERS. 0.0 0.0 10/7/2022 12:00 10/7/2022 16:00 4.00 SLOT, PLUG PULD P BUILD 22 STDS OF 5" DP VIA MOUSEHOLE AND RACK BACK IN THE DERRICK. 0.0 0.0 10/7/2022 16:00 10/7/2022 21:00 5.00 SLOT, PLUG PULD T WORK RIG CONDITION AUDIT, HOUSEKEEPING, AND DOYON MP-2 WORK ORDERS. SIMOPS - REPLACE PIPE SKATE CHAIN SPROCKET BEARINGS. 0.0 0.0 10/7/2022 21:00 10/7/2022 23:00 2.00 SLOT, PLUG PULD P BUILD 11 STDS OF 5" DP VIA MOUSEHOLE AND RACK BACK IN THE DERRICK.(33 TOTAL IN THE DERRICK) 0.0 0.0 10/7/2022 23:00 10/7/2022 23:30 0.50 SLOT, PLUG SVRG P SERVICE SKATE. REPAIR PIPESHED SKATE. 0.0 0.0 10/7/2022 23:30 10/8/2022 00:00 0.50 SLOT, PLUG PULD T REPAIR PIPESHED SKATE. CONTINUE WITH HOUSEKEEPING, RIG UP CELLAR FOR CIRCULATION, PREP RIG FLOOR FOR GUN RUN. 0.0 0.0 10/8/2022 00:00 10/8/2022 01:00 1.00 SLOT, PLUG PERF P PJSM, M/U GUNS AS PER SLMB GUN HAND TO 20' MD. 0.0 20.0 10/8/2022 01:00 10/8/2022 02:45 1.75 SLOT, PLUG TRIP P RIH W/ PERF GUNS ON 4" DP FROM DERRICK TO 4,088' MD. M/U SINGLE AND SET GUN ON DEPTH AT 4110' MD. MONITOR DISP VIA TT. 20.0 4,110.0 10/8/2022 02:45 10/8/2022 03:45 1.00 SLOT, PLUG PERF P FLOOD SURFACE LINES, LINE UP CHOKE TO GAS BUSTER, MUD PUMP 2 AND TEST CHART TO THE IA. DROP 5/8" STEEL BALL. 4,110.0 4,110.0 10/8/2022 03:45 10/8/2022 04:00 0.25 SLOT, PLUG PERF P VERIFY DEPTH AS PER CPAI REP. PUMP BALL DOWN AT 50 GPM. BALL ON SEAT AND CONTINUE TO PRESSURE UP TO FIRE GUNS. GUNS FIRE AT 2328 PSI AND 27 TOTAL STKS. 4,110.0 4,110.0 10/8/2022 04:00 10/8/2022 05:00 1.00 SLOT, PLUG LOT P CLOSE IBOP, LINE UP TO INJECT VIA IA, PRESSURE UP TO 930 PSI AND OBSERVE PRESSURE BREAK OVER. CONTINUE TO PUMP AND INCREASE RATE TO 2 BPM, 640 PSI. 13 TOTAL BBLS INJECTED. SHUT DOWN OBSERVE PSI DROP TO 100PSI IN 15 MIN. INJECT ADDITIONAL 5 BBLS AT 2 BPM, 620 PSI. 4,110.0 4,110.0 10/8/2022 05:00 10/8/2022 06:15 1.25 SLOT, PLUG CIRC P BLEED OFF ALL PRESSURE. OWFF (STATIC) CIRCULATE A BOTTOMS UP AT 1 BPM, 1777 PSI, 20% F/O. 4,110.0 4,110.0 10/8/2022 06:15 10/8/2022 06:30 0.25 SLOT, PLUG OWFF P OWFF (STATIC) 4,110.0 4,110.0 10/8/2022 06:30 10/8/2022 09:30 3.00 SLOT, PLUG TRIP P L/D WORKING SINGLE TO PIPE SHED. POOH AND RACK BACK 4". L/D PERF GUNS & INSPECT. (ALL SHOTS FIRED) 4,110.0 0.0 10/8/2022 09:30 10/8/2022 10:45 1.25 SLOT, PLUG BHAH P CLEAN & CLEAR FLOOR. BREAK DOWN 7" SCRAPER BHA. 0.0 0.0 10/8/2022 10:45 10/8/2022 11:00 0.25 SLOT, PLUG BHAH P M/U CEMENT RETAINER AS PER BAKER REP. 0.0 0.0 10/8/2022 11:00 10/8/2022 13:30 2.50 SLOT, PLUG TRIP P RIH W/CEMENT STINGER ASSY T/4,048' MD. MONITOR DISP VIA TT. 0.0 4,048.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 16/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/8/2022 13:30 10/8/2022 15:00 1.50 SLOT, PLUG RURD P P/U CEMENT SWIVEL TO RIG FLOOR. BREAK OUT 5" PUP JT AND REPLACE W/4" XT 39 PUP JT. M/U TIW AND CEMENT SWIVEL ASSY. R/U CEMENT LINES. 4,048.0 4,048.0 10/8/2022 15:00 10/8/2022 15:30 0.50 SLOT, PLUG CIRC P CIRC DRILL STRING VOLUME W/5 BPM / 460 PSI. P/U WT 99K / S/O WT 98 K. 4,048.0 4,048.0 10/8/2022 15:30 10/8/2022 16:00 0.50 SLOT, PLUG PACK P SET CEMENT RETAINER AS PER BACKER REP. BOTTOM OF RETAINER 4,048' / TOP OF RETAINER 4,046'. CONFIRM SET WITH 20 K MAX OVER PULL AND 30 K WOB. (FREE P/U WT WAS 99 K AND FREE S/O WAS WT 98 K) 4,048.0 4,048.0 10/8/2022 16:00 10/8/2022 16:15 0.25 SLOT, PLUG PRTS P BREAK CIRC THROUGH KILL LINE. SHUT IN UPPER PIPE RAMS AND PT IA/CEMENT RETAINER TO 1500 PSI & CHART FOR 10 MIN. (GOOD) BLEED OFF PSI AND OPEN RAMS 4,048.0 4,048.0 10/8/2022 16:15 10/8/2022 16:45 0.50 SLOT, PLUG LOT P SET 30 K WOB & INJECT INTO LOWER QANNIK AT 2 BPM / 560 PSI. PUMP 5 BBLS TOTAL. 820 PSI FRAC PRESSURE 4,048.0 4,048.0 10/8/2022 16:45 10/8/2022 18:00 1.25 SLOT, PLUG SQEZ P SHUT IN ON UPPER PIPE RAMS & TRAP 500 PSI ON IA. TURN OVER TO SLB. FLUID PACK LINES W/2 BBLS H2O AND PT LINES TO 2500 PSI. (GOOD). PUMP 25 BBLS 15.8 PPG CLASS G QANNIK BLEND CEMENT W/2 BPM. INITIAL 530 PSI AND FINAL 108 PSI. DISPLACE WITH 9.8 PPG BRINE 36 BBLS TOTAL DISPLACEMENT. DISPLACED 31 BBLS W/2 BPM INITIAL 60 PSI AND FINAL 250 PSI. 2 BBLS W/.5 BPM AT 130 PSI, AND PERFORMED HESITATION SQUEEZES AT .5 BPM FOR FINAL 3 BBLS INITIAL 175 PSI AND FINAL 239 PSI. (20 BBLS BELOW RETAINER WITH 17 BBLS INTO PERF'S, AND LEFT 5 BBLS CEMENT ABOVE RETAINER) 4,048.0 4,048.0 10/8/2022 18:00 10/8/2022 18:15 0.25 SLOT, PLUG RURD P BLEED OFF IA. OPEN UPPER RAMS. UN-STING FROM RETAINER AS PER BAKER REP. CIP @ 18:15 HRS BOTTOM OF RETAINER 4,048' / TOP OF RETAINER 4,046' 4,048.0 4,046.0 10/8/2022 18:15 10/8/2022 19:00 0.75 SLOT, PLUG RURD P R/D CEMENT SWIVEL. P/U SINGLE FROM SHED. R/B STAND # 43. FROM 4,045' MD T / 3,958' MD. B/D CEMENT LINE. 4,046.0 3,958.0 10/8/2022 19:00 10/8/2022 19:30 0.50 SLOT, PLUG CIRC P RECIP PIPE FROM 3,958' MD T/ 3,864' MD AND CIRC B/U WITH 250 GPM, 387 PSI, 37% F/O. TOTAL STKS PUMPED - 2050. DUMPED 45 BBLS TO ROCK WASHER W/2 BBLS GREEN CEMENT 3,958.0 3,864.0 10/8/2022 19:30 10/8/2022 19:45 0.25 SLOT, PLUG OWFF P OWFF (STATIC), B/D T/D. PREP RIG FLOOR FOR POOH 3,864.0 3,864.0 10/8/2022 19:45 10/8/2022 21:45 2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,864' MD TO BAKER RUNNING TOOL. L/D BAKER RUNNING TOOL. MONITOR DISP VIA TT. 3,864.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 17/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/8/2022 21:45 10/8/2022 22:30 0.75 SLOT, PLUG WWWH P WASH STACK @ MAX RATE CLEANING ALL CEMENT FROM BOPE. B/D TD. 0.0 0.0 10/8/2022 22:30 10/8/2022 23:00 0.50 SLOT, PLUG RURD P P/U CEMENT SWIVEL AND C/O 5' PUP TO A 10' XT-39 PUP. 0.0 0.0 10/8/2022 23:00 10/9/2022 00:00 1.00 SLOT, PLUG PULD P BUILD 9 STANDS OF 5" DP VIA MOUSEHOLE. 0.0 0.0 10/9/2022 00:00 10/9/2022 08:00 8.00 SLOT, PLUG PULD P CONT. TO BUILD 5" DP AND RACK BACK IN DERRICK VIA MOUSEHOLE. SIMOPS - LOAD 30 JTS 3-1/2" HYD 563 CEMENT STINGER INTO PIPE SHED. 0.0 0.0 10/9/2022 08:00 10/9/2022 11:00 3.00 SLOT, PLUG TRIP P RIH W/ 6 1/8 BIT, BIT SUB, XO AND 4" DP TO 3,791' MD. MONITOR DISP VIA TT. 0.0 3,791.0 10/9/2022 11:00 10/9/2022 11:30 0.50 SLOT, PLUG WASH P KELLY UP AND WASH DN FROM 3,791' MD TO TOP OF CEMENT @ 3,988' MD. WASH DN @ 100 GPM, 180 PSI, 27% F/O. TAG W/ 8K. UP WT - 98K, S/O WT - 99K. AOGCC REP LOU LAUBENSTEIN WITNESS TAG. 3,791.0 3,988.0 10/9/2022 11:30 10/9/2022 12:00 0.50 SLOT, PLUG PRTS P POOH TO 3,981' MD & R/U AND TEST CEMENT TO 1500 PSI FOR 30 CHARTED MIN (GOOD). AOGCC REP LOU LAUBENSTEIN WITNESS THE TEST. 3,988.0 3,981.0 10/9/2022 12:00 10/9/2022 14:00 2.00 SLOT, PLUG CIRC P R/D TESTING EQUIPMENT. KELLY UP TO STD 42 AND CIRC B/U @ 300 GPM, 550 PSI, 50 RPM, 38% F/O. ROT AND RECIP PIPE F/ 3,981' MD TO 3,887' MD W/ 1K TQ. OBSERVE METAL PERF DEBRIS AT BUTTOMS UP. CONTINUE TO CIRC PUMPING HI VIS SWEEP S/S UNTIL RETURNS CLEANED UP. TOTAL STKS PUMPED - 4120. 3,981.0 3,981.0 10/9/2022 14:00 10/9/2022 16:00 2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,891' MD. MONITOR DISP VIA TT. L/D BIT AND BIT SUB. 3,891.0 0.0 10/9/2022 16:00 10/9/2022 17:00 1.00 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR. PREP FOR GUN RUN. 0.0 0.0 10/9/2022 17:00 10/9/2022 17:30 0.50 SLOT, PLUG BHAH P P/U AND M/U PERF GUNS T/ 40' MD AS PER PERF HAND. 0.0 40.0 10/9/2022 17:30 10/9/2022 19:45 2.25 SLOT, PLUG TRIP P RIH W/ TCP GUNS ON 4" DP F/ 40' MD TO 3,923' MD. MONITOR DISP VIA TT. S/O WT - 97K 40.0 3,923.0 10/9/2022 19:45 10/9/2022 20:15 0.50 SLOT, PLUG PERF P SPACE OUT. SET LOWER PERFS AT 3,923' MD. TOP PERFS AT 3892' MD. DROP 5/8" STEEL BALL. FLOOD SURFACE LINES. PUMP BALL DN AT 1 BPM, OBSERVE GUNS FIRE AT 2309 PSI. 25 TOTAL STKS PUMPED. 3,923.0 3,923.0 10/9/2022 20:15 10/9/2022 20:45 0.50 SLOT, PLUG LOT P CLOSE HCR CHOKE. CLOSE IBOP. OPEN SECONDARY KILL LINE. PUMP DN KILL INTO IA AT 5 SPM, OBSERVE FORMATION BREAK OVER AT 775 PSI. PUMP ADDITIONAL 1 BBL FCP - 682. TOTAL STKS PUMPED - 23. SHUT IN ISIP - 580, FSIP - 395 FOR 15 MIN. 3,923.0 3,923.0 10/9/2022 20:45 10/9/2022 21:30 0.75 SLOT, PLUG OWFF P ATTEMP TO CIRC B/U AND OBSERVE 3000 PSI. SHUT DN. CHECK SURFACE LINES. NO OBSTRUCTIONS ON SURFACE. B/D TD. OWFF (STATIC) 3,923.0 3,923.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 18/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/9/2022 21:30 10/9/2022 23:30 2.00 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3923' MD TO 40' MD. UP WT - 98K. MONITOR DISP VIA TT. 3,923.0 40.0 10/9/2022 23:30 10/10/2022 00:00 0.50 SLOT, PLUG BHAH P L/D PERF GUNS VIA MOUSEHOLE. CONFIRM ALL SHOTS FIRED. 40.0 0.0 10/10/2022 00:00 10/10/2022 01:15 1.25 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR. MOBILIZE CLEANOUT BHA COMPONENTS TO THE RIG FLOOR. 0.0 0.0 10/10/2022 01:15 10/10/2022 03:30 2.25 SLOT, PLUG BHAH P PJSM, P/U YELLOWJACKET CLEANOUT ASSEMBLY AS PER YELLOWJACKET REP TO 322' MD. MONITOR DISP VIA TT. 0.0 322.0 10/10/2022 03:30 10/10/2022 04:45 1.25 SLOT, PLUG TRIP P RIH W/ CLEANOUT ASSEMBLY FROM 322' MD TO 3,918' MD. MONITOR DISP VIA TT. 322.0 3,918.0 10/10/2022 04:45 10/10/2022 05:00 0.25 SLOT, PLUG WASH P WASH AND REAM DN F/ 3,918' MD TO 3,984' MD W/ 405 GPM, 1063 PSI, 51% F/O, 30 RPM, 1K TQ, ROT WT - 102K 3,918.0 3,984.0 10/10/2022 05:00 10/10/2022 06:30 1.50 SLOT, PLUG WASH P PUMP 10 BBL LOW 10 BBL HIGH VIS SWEEP WHILE ROT AND RECIP PIPE FROM 3,984' MD TO 3,920' MD W/ 405 GPM, 1067 PSI, 47% F/O, 30 RPM, 1K TQ, P/U WT - 96K, SO WT - 102 WHILE AT RATE. TOTAL STKS PUMPED - 6751. NOTHING NOTE WORTHY ON SHAKERS AT B/U. 3,984.0 3,984.0 10/10/2022 06:30 10/10/2022 07:30 1.00 SLOT, PLUG SQEZ P SPOT 20 BBL FRESH WATER AT PERFS AT 3,980' MD @ 168 GPM, 460 PSI, 31% F/O. CLOSE UPPER RAMS, SQUEEZE WATER AT 4 SPM, PRESSURE UP TO 440. SHUT IN AND OBSERVE BLEED DOWN TO 370 OVER 25 MIN. BLEED OFF PRESSURE. 3,984.0 3,984.0 10/10/2022 07:30 10/10/2022 08:15 0.75 SLOT, PLUG WASH P PUMP 10 BBL LOW 10 BBL HIGH VIS SWEEP WHILE ROT AND RECIP PIPE FROM 3984' MD TO 3,920' MD W/ 405 GPM, 1061 PSI, 46% F/O, 30 RPM, 1K TQ, P/U WT - 96K, SO WT - 102 WHILE AT RATE. TOTAL STKS PUMPED - 2741. NOTHING NOTE WORTHY ON SHAKERS AT B/U. 3,984.0 3,984.0 10/10/2022 08:15 10/10/2022 08:30 0.25 SLOT, PLUG OWFF P OWFF (STATIC) 3,984.0 3,984.0 10/10/2022 08:30 10/10/2022 10:15 1.75 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,984' MD TO 330' MD. UP WT - 101K. MONITOR DISP VIA TT. 3,984.0 330.0 10/10/2022 10:15 10/10/2022 11:30 1.25 SLOT, PLUG BHAH P L/D BHA F/ 330' MD AS PER YELLOWJACKET REP. MONITOR DISP VIA TT. 330.0 0.0 10/10/2022 11:30 10/10/2022 13:00 1.50 SLOT, PLUG RURD P CLEAN AND CLEAR RIG FLOOR, SIMOPS - P/U DOYON CSG 3½ HANDLING EQUIPMENT 0.0 0.0 10/10/2022 13:00 10/10/2022 15:30 2.50 SLOT, PLUG PUTB P PJSM, M/U AND RIH W/ 30 JTS OF 3½ H563 12.7# L-80 CEMENT STRINGER ASSEMBLY TO 927' MD. MONITOR DISP VIA TT. 0.0 927.0 10/10/2022 15:30 10/10/2022 16:45 1.25 SLOT, PLUG TRIP P RIH W/ CEMENT STRINGER ASSEMBLY ON 4" DP F/ 927' MD TO 3,950' MD. MONITOR DISP VIA TT. S/O WT - 92K. 927.0 3,950.0 10/10/2022 16:45 10/10/2022 17:15 0.50 SLOT, PLUG PULD P P/U WORKING 4" SINGLE AND 5' PUP JT AND TAG TOC @ 3,988' MD W/ 5K. L/D PUP JT 3,950.0 3,982.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 19/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/10/2022 17:15 10/10/2022 17:30 0.25 SLOT, PLUG RURD P P/U AND M/U CEMENT SWIVEL. RIH F/ 3,982' MD TO 3,987' MD. 3,982.0 3,987.0 10/10/2022 17:30 10/10/2022 18:45 1.25 SLOT, PLUG CMNT P PT LINES TO 500 LOW, 2000 HIGH (GOOD). PUMP 14 BBLS OF 13.5 PPG MUD PUSH @ 4 BPM, 220 PSI, 30% F/O. PUMP 30 BBLS 15.8 PPG CLASS G CEMENT @ 4 BPM, 70 PSI, 21% F/O. CHASE CEMENT W/ 6 BBL OF 13.5 MUD PUSH @ 4 BPM, 30 PSI, 21% F/O. CHASE W/ 18 BBLS OF 9.8 BRINE @ 4 BPM, 30 PSI, 27% F/O. SLOW RATE TO 2 BPM, PUMP 5 BBLS OF 9.8 BRINE W/ 6 PSI, 22% F/O. CIP @ 18:40. CEMENT WET @ 18:07. ROT STRING @ 20 RPM, 1K TQ DURING JOB. 3,987.0 3,987.0 10/10/2022 18:45 10/10/2022 19:00 0.25 SLOT, PLUG RURD P R/D CEMENTERS AND CEMENT SWIVEL. 3,987.0 3,987.0 10/10/2022 19:00 10/10/2022 19:30 0.50 SLOT, PLUG TRIP P POOH F/ 3,987' MD, LAYING DOWN WORKING SINGLE, TO 3,193' MD @ 45 FT/MIN. MONITOR DISP VIA TT. 3,987.0 3,193.0 10/10/2022 19:30 10/10/2022 20:15 0.75 SLOT, PLUG CIRC P PUMP DOWN FOAM WIPER BALL AT 250 GPM, 262 PSI, 47% F/O WHILE ROT AND RECIP PIPE FROM 3,193' MD TO 3,102' MD. OBSERVE MUD PUSH AND TRACES OF CEMENT TO SURFACE AT BOTTOMS UP. DUMP TO THE ROCK. 47 BBLS TOTAL. 1994 TOTAL STKS PUMPED. 3,193.0 3,193.0 10/10/2022 20:15 10/11/2022 00:00 3.75 SLOT, PLUG SQEZ P PERFORM HESITATION SQUEEZE. CLOSE ANNULAR. PUMP DN STRING @ .5 SPM, PRESSURE UP TO 750 IN 8 STKS. SHUT IN AND MONITOR. OBSERVE PSI BLEED TO 617 IN 17 MIN. PRESSURE BACK UP TO 770 W/ 1 ADDITIONAL STKS. OBSERVE PSI DROP TO 658 IN 25 MIN. BLEED PSI TO 0. OBSERVE 3 BBLS BLED BACK TO THE TRIP TANK. PRESSURE BACK UP TO 850 W/ 16 STKS. OBSERVE PSI DROP TO 759 IN 20 MIN. PRESSURE BACK UP TO 870 PSI. OBSERVE PSI DROP TO 818 IN 17 MIN. PRESSURE BACK UP TO 930 PSI. OBSERVE PRESSURE DROP TO 842 IN 33 MIN. DECISION MADE TO. LEAVE SHUT IN TIL 00:30 HRS ON 10/11/22 3,193.0 3,193.0 10/11/2022 00:00 10/11/2022 00:30 0.50 SLOT, PLUG SQEZ P OBSERVE PSI DROP TO 619 PSI. (138 MIN HELD - 311 PSI BLED OFF TOTAL) BLEED OFF PSI TO TT. OBSERVE 1 BBL BLED BACK. OPEN ANNULAR. 3,193.0 3,193.0 10/11/2022 00:30 10/11/2022 01:00 0.50 SLOT, PLUG CIRC P ROT AND RECIP PIPE F/ 3,193' MD T/ 3,098' MD W/ 250 GPM, 280 PSI, 38% F/O, 30 RPM, 1K TQ, UP WT - 76K, S/O WT - 72K, ROT WT - 79K TOTAL STKS PUMPED - 950 3,193.0 3,193.0 10/11/2022 01:00 10/11/2022 01:15 0.25 SLOT, PLUG OWFF P OWFF (STATIC) 3,193.0 3,193.0 10/11/2022 01:15 10/11/2022 02:00 0.75 SLOT, PLUG TRIP P POOH ON ELEVATORS F/ 3,193' MD T/ 927' MD. MONITOR DISP VIA TT. 3,193.0 927.0 10/11/2022 02:00 10/11/2022 02:15 0.25 SLOT, PLUG SFTY P PJSM, SWAP OUT HANDLING EQUIPMENT TO 3½. 927.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 20/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/11/2022 02:15 10/11/2022 03:00 0.75 SLOT, PLUG TRIP P RACK BACK IN THE DERRICK 3½ H563 CEMENT STRINGER ASSEMBLY F/ 927' MD. MONITOR DISP VIA TT. 927.0 0.0 10/11/2022 03:00 10/11/2022 04:00 1.00 SLOT, PLUG WWWH P M/U STACK FLUSHING TOOL AND FLUSH SWARF AND CEMENT FROM BOPE @ 800 GPM. B/D TOP DRIVE. 0.0 0.0 10/11/2022 04:00 10/11/2022 04:45 0.75 SLOT, PLUG RURD P PULL WEAR BUSHING AND INSTALL TEST PLUG AS PER FMC 0.0 0.0 10/11/2022 04:45 10/11/2022 07:30 2.75 SLOT, WHDBOP RURD P R/U TO TEST BOPE. M/U XT-39 FLOOR VALVES AND DART. INSTALL TEST SUB ON TOP DRIVE. FLOOD STACK AND SURFACE EQUIPMENT WITH WATER. SHELL TEST BOPE. (GOOD). 0.0 0.0 10/11/2022 07:30 10/11/2022 12:00 4.50 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 4,200 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 4" TEST JT TEST ANNULAR T/ 3500 PSI, 3.5" X 6" UPR, 3.5" X 6" LPR, W/ 3 1/2" TEST JT TEST 3.5" X 6" UPR & 3.5" X 6" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 4" FOSV, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3050 PSI. MANIF. = 1550 PSI. ACC = 1750 PSI AFTER ALL FUNCTIONS ON BOTTLES, 9 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 70 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR =7 SEC. UPR = 7 SEC. BLIND / SHEARS = 7 SEC. LPR = 7 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; NITROGEN BACKUP SIX BOTTLE AVE = 2000 PSI. TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP KAM ST. JOHN WAIVED WITNESS. 0.0 0.0 10/11/2022 12:00 10/11/2022 15:00 3.00 SLOT, PERF RURD T R/D TESTING EQUIPMENT, ATTEMPT TO PULL TEST PLUG PER FMC REP. COULD NOT PULL FREE WITH THE TUGGER, FMC DIRECTED TO USE TOP DRIVE PULLED 20K ON ELEVATORS OVER PULL, CONTACTED TOOL PUSHER & CPAI REP. L/D TEST JT, M/U 4" DOUBLE TO NC50 X-OVER, M/U DOUBLE T/ TEST PLUG & KELLY UP W/ TOP DRIVE, PULL 30K STRAIGHT PULL NO SUCCESS, APPLY 10K TQ W/ 5K PULL NO SUCCESS, REPEAT PROCESS MULTIPLE TIMES NO SUCCESS. S/O 10K WOB THEN ATTEMPT 30K STRAIGHT PULL NO SUCCESS. STOP THE JOB FMC/CPAI CONTACT TOWN. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 21/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/11/2022 15:00 10/11/2022 16:30 1.50 SLOT, PERF RURD T STAGE SUPER SUCKER @ BEAVER SLIDE & RUN HOSE T/ RIG FLOOR T/ SUCK OUT STACK, ONCE STACK EMPTIED, PULL LOCKDOWN SCREW PER FMC REP, VERIFIED CORRECT TEST PLUG, PULL 3 MORE LOCKDOWNS & FLUSH PROFILE W/ FRESH WATER, RE-INSTALL LOCKDOWN SCREWS 0.0 0.0 10/11/2022 16:30 10/11/2022 17:30 1.00 SLOT, PERF PULD T HEAT WELL VIA STEAM, PULL 30K OVERPULL NO SUCCESS, PULL DOUBLE F/ TEST PLUG, P/U WORKING SINGLE AND BOOT BASKETS, MAGNETS & BIT PER YELLOW JACKET REP. 0.0 0.0 10/11/2022 17:30 10/11/2022 18:30 1.00 SLOT, PERF WWWH T RIH TO TOP OF PLUG. CIRC AT 411 GPM, 160 PSI, 48% F/O, 16 RPM. 1827 TOTAL STKS. L/D BHA AND WORKING SINGLE. 0.0 0.0 10/11/2022 18:30 10/11/2022 21:30 3.00 SLOT, PERF RURD T EMPTY STACK. BOLDS AND INSPECT. PRESSURE WASH INTO PORTS OF LDS. ADD OIL TO TOP AND BOTTOM OF TEST PLUG. ATTEMPT TO PULL (UNSUCCESSFUL) 0.0 0.0 10/11/2022 21:30 10/11/2022 23:00 1.50 SLOT, PERF PULD T L/D 4" PULLING ASSEMBLY AND M/U 5" HWDP. ATTEMPT TO TO PULL W/ 30K OVER, 10K TQ, AND 20K DN WT. (UNSUCCESSFUL). 0.0 0.0 10/11/2022 23:00 10/12/2022 00:00 1.00 SLOT, PERF RURD T DECISION MADE TO APPLY STEAM TO TUBING SPOOL AND INTO THE OPENINGS OF THE LDS. 0.0 0.0 10/12/2022 00:00 10/12/2022 00:30 0.50 SLOT, PERF RURD T CONTINUE WITH APPLYING STEAM. R/U EZ TQ AND TUGGER TO 5" HWDP IN THE HOLE AND WORK BACK AND FORTH AND SUCCESSFULLY WORK THE TEST PLUG FROM WELLHEAD. 0.0 0.0 10/12/2022 00:30 10/12/2022 01:30 1.00 SLOT, PERF RURD T L/D 2 JTS HWDP. INSPECT TEST PLUG. RE-INSTALL LDS. SIMOP - INSPECT TD. CLEAR AND CLEAN RIG FLOOR. 0.0 0.0 10/12/2022 01:30 10/12/2022 02:00 0.50 SLOT, PERF RURD T M/U 2 JTS & STACK FLUSHING TOOL. FUNCTION TEST ANNULAR, UPPER RAMS, BLIND/SHEAR RAMS, AND LOWER RAMS. 0.0 0.0 10/12/2022 02:00 10/12/2022 02:45 0.75 SLOT, PERF WWWH T FLUSH STACK W/ 888 GPM, 50 PSI, 60% F/O, 15 RPM. 0.0 0.0 10/12/2022 02:45 10/12/2022 03:30 0.75 SLOT, PERF RURD T L/D 2 JTS & STACK FLUSHING TOOL. B/D TD. DRAIN STACK. PREP NEW TEST PLUG TO INSTALL. REMOVE BIT FROM CLEAN OUT ASSEMBLY USED FOR WASHING STACK. 0.0 0.0 10/12/2022 03:30 10/12/2022 04:30 1.00 SLOT, PERF RURD T B/D AND FLUSH MUD LINE. PREP TO SET PLUG AND TEST UPPER LOCK DOWN SCREWS. SIMOPS - MOBILIZE BAKER BHA TO THE RIG FLOOR FOR TAGING CEMENT. 0.0 0.0 10/12/2022 04:30 10/12/2022 05:00 0.50 SLOT, PERF PRTS T INSTALL SPARE TEST PLUG. FLOOD LINES AND CLOSE BLINDS. TEST UPPER LDS TO 250 LOW 4200 HIGH F/ 5/5 CHARTED MIN (GOOD). 0.0 0.0 10/12/2022 05:00 10/12/2022 06:00 1.00 SLOT, PERF RURD P PULL TEST PLUG AND INSTALL 9" ID WEAR BUSHING PER FMC. SIMOPS - BLOW DOWN TESTING EQUIPMENT. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 22/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/12/2022 06:00 10/12/2022 06:30 0.50 SLOT, PERF BHAH P HOLD PJSM/ M/U PIPE TALLY ON RIH W/ 6-1/8" BIT AND 7" SCRAPER BHA. 0.0 0.0 10/12/2022 06:30 10/12/2022 08:00 1.50 SLOT, PERF TRIP P RIH/ 6 1/8" BIT/ SCRAPER BHA F/ SURFACE T/ 3,147' MD, P/U WT=96K, S/O WT= 95K. 0.0 3,147.0 10/12/2022 08:00 10/12/2022 08:15 0.25 SLOT, PERF WASH P KELLY UP T/ STD #33, ROT./RECIP. F/ 3,132' MD T/ 3,041' MD, WHILE CIRCULATING B/U @ 6 BPM, 430 PSI, 34% F/O, 30 RPM, 1K TQ, P/U RT WT= 79K S/O RT WT= 85K. 700 STROKES 3,041.0 3,132.0 10/12/2022 08:15 10/12/2022 09:00 0.75 SLOT, PERF WASH P KELLY UP T/ STAND #34, WASH DOWN @ 2BPM, 86K S/O, 26% F/O, F/ 3,136' TO TAG 10K WOB TOC @ 3,216' MD, INCREASE PUMP RATE T/ 6 BPM, ROTATE @ 30 RPM TO CLEAN HOLE 3,136.0 3,216.0 10/12/2022 09:00 10/12/2022 10:00 1.00 SLOT, PERF PRTS P R/U & TEST CEMENT T/ 1500 PSI PRIOR TO AOGCC REP. KAM ST.JOHN WITNESS. 3,216.0 3,216.0 10/12/2022 10:00 10/12/2022 11:00 1.00 SLOT, PERF PRTS P R/U & TEST CEMENT T/ 1500 PSI AOGCC REP. KAM ST.JOHN WITNESS. BLEED OFF TEST & CHANGE RIG UP OFF OF MUD MANIFOLD INSTESD OF CEMENT LINE ABOVE WIND WALLS TO ELIMINATE TEMPERATURE SWING ON TEST 3,216.0 3,216.0 10/12/2022 11:00 10/12/2022 12:00 1.00 SLOT, PERF PRTS P TEST CEMENT T/ 1500 PSI AOGCC REP. KAM ST.JOHN WITNESS FOR 30 MIN. (CHARTED). 3,216.0 3,216.0 10/12/2022 12:00 10/12/2022 12:30 0.50 SLOT, PERF RURD P R/D TESTING EQUIPMENT, KELLY UP & TAG TOC 10K WOB @ 3,216' MD AOGCC REP. KAM ST.JOHN WITNESSED. 3,216.0 3,216.0 10/12/2022 12:30 10/12/2022 12:45 0.25 SLOT, PERF OWFF P OWFF (STATIC), B/D TD 3,216.0 3,216.0 10/12/2022 12:45 10/12/2022 14:00 1.25 SLOT, PERF TRIP P POOH F/ 3,137,' P/U WT 83K, T/ SURFACE, L/D SCRAPER ASSEMBLY PER BAKER REP 3,217.0 0.0 10/12/2022 14:00 10/12/2022 14:30 0.50 SLOT, PERF SFTY P PJSM, M/U BRIDGE PLUG PER BAKER REP., 0.0 0.0 10/12/2022 14:30 10/12/2022 18:30 4.00 SLOT, PERF TRIP P RIH W/ BRIDGE PLUG F/ SURFACE T/ 3,118 MONITORING DISPLACEMENT VIA T.T., FILLING PIPE EVERY 20 STDS 0.0 3,118.0 10/12/2022 18:30 10/12/2022 19:00 0.50 SLOT, PERF PACK P SET BRIDGE PLUG AS PER BAKER REP. TOP OF BRIDGE PLUG 3,118' / BOTTOM OF BRIDGE PLUG 3,119' 3,118.0 3,118.0 10/12/2022 19:00 10/12/2022 19:45 0.75 SLOT, PERF RURD P P/U T/ 3,101' MD, L/D TOP SINGLE OF STD 33, R/U TO TEST BRIDGE PLUG 3,118.0 3,101.0 10/12/2022 19:45 10/12/2022 21:00 1.25 SLOT, PERF PRTS P TEST BRIDGE PLUG T/ 2500 PSI FOR 30 MINUTES (CHARTED). 3,101.0 3,101.0 10/12/2022 21:00 10/12/2022 21:15 0.25 SLOT, PERF RURD P RIG DOWN TEST EQUIPMENT, CLEAN AND CLEAR RIG FLOOR, PREP FOR TRIP OUT OF HOLE 3,101.0 3,101.0 10/12/2022 21:15 10/12/2022 22:30 1.25 SLOT, PERF TRIP P POOH F/3,101' T/0' PUW=83K, MONITOR HOLE FILL VIA T.T 3,101.0 0.0 10/12/2022 22:30 10/12/2022 23:30 1.00 SLOT, PERF RURD P L/D BAKER RUNNING TOOL, CLEAN AND CLEAR RIG FLOOR, PREP FOR UPCOMING GUN RUN 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 23/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/12/2022 23:30 10/13/2022 00:00 0.50 SLOT, PERF RURD P MOBILIZE GUNS AND FIRING HEAD, PJSM 0.0 0.0 10/13/2022 00:00 10/13/2022 01:30 1.50 SLOT, PERF TRIP P RIH F/0 T/3,070', SOW=85K, MONITOR DISPLACEMENT VIA T.T 0.0 3,070.0 10/13/2022 01:30 10/13/2022 01:45 0.25 SLOT, PERF PERF P SPACE OUT AS PER CO MAN, PUMP DOWN 5/8" STEEL BALL AS PER REP @ 1BPM, 30 STKS 2386 PSI, "GUNS FIRED" TOP OF PERFS 3,028' / BOTTOM PERFS 3,070' 3,070.0 3,070.0 10/13/2022 01:45 10/13/2022 03:00 1.25 SLOT, PERF CIRC P CIRCULATE @ 1 BPM, 1473 PSI, 757 TOTAL STKS. NO GAS OR ANYTHING NOTE WORTHY ON B/U. 3,070.0 3,070.0 10/13/2022 03:00 10/13/2022 03:30 0.50 SLOT, PERF OWFF P OWFF = 30 MIN (STATIC) 3,070.0 3,070.0 10/13/2022 03:30 10/13/2022 04:45 1.25 SLOT, PERF TRIP P POOH F/3,070' T/0', PUW=86K, MONITOR HOLE FILL VIA T.T 3,070.0 0.0 10/13/2022 04:45 10/13/2022 05:30 0.75 SLOT, PERF BHAH P INSPECT TCP GUNS. ALL 840 SHOTS FIRED. L/D GUNS TO PIPE SHED. CLEAN AND CLEAR FLOOR. 0.0 0.0 10/13/2022 05:30 10/13/2022 06:45 1.25 SLOT, PERF BHAH P M/U YELLOW JACKET 6-1/8" MILL/CLEAN OUT BHA T/151' 0.0 151.0 10/13/2022 06:45 10/13/2022 07:45 1.00 SLOT, PERF TRIP P RIH W/CLEAN OUT BHA F/151' T/3,118'. SOW=90K, MONITOR HOLE FILL VIA T.T 151.0 3,118.0 10/13/2022 07:45 10/13/2022 08:30 0.75 SLOT, PERF CIRC P TAG BRIDGE PLUG W/10 K WOB. CIRC 3XB/U W/250 GPM, 466 PSI, RECIPROCATE PIPE 30'. ROT = 83K. SAW SIGNIFICANT AMOUNTS OF GUN DEBRIS ON B/U. 3,118.0 3,118.0 10/13/2022 08:30 10/13/2022 09:00 0.50 SLOT, PERF LOT P SPACE OUT IN BOPE. SHUT IN ON UPPER RAMS. ATTEMPT TO CIRC UP OA WITH NO SUCCESS. PERFORM LOT ON LOWER HALO. PUMP .5 BBL MIN AND OBSERVE BREAK OVER AT 494 PSI / 12.94 PPG EMW. INJECT 2 BBLS PAST BREAK OVER .5 BPM AT 400 PSI / 12.34 PPG EMW INJECTIVITY. 3,118.0 3,118.0 10/13/2022 09:00 10/13/2022 09:15 0.25 SLOT, PERF CIRC P CIRC B/U W/250 GPM, 450 PSI. NOTHING NOTE WORTHY ON B/U 3,118.0 3,118.0 10/13/2022 09:15 10/13/2022 09:30 0.25 SLOT, PERF OWFF P OWFF (STATIC) SIMOPS - BLOW DOWN TOP DRIVE AND PREP RIG FLOOR TO POOH. 3,118.0 3,118.0 10/13/2022 09:30 10/13/2022 10:45 1.25 SLOT, PERF TRIP P POOH F/3,118' T/151', PUW=87K, MONITOR HOLE FILL VIA T.T 3,118.0 151.0 10/13/2022 10:45 10/13/2022 11:30 0.75 SLOT, PERF BHAH P RACK BACK DC'S. INSPECT BHA. GUN DEBRIS ON MAGNETS AND NOTHING IN BOOT BASKETS. L/D YELLOW JACKET BHA TO PIPE SHED. 151.0 0.0 10/13/2022 11:30 10/13/2022 12:00 0.50 SLOT, PERF BHAH P CLEAN AND CLEAR FLOOR 0.0 0.0 10/13/2022 12:00 10/13/2022 15:00 3.00 SLOT, PERF SVRG P SERVICE RIG. PM'S ON DRAW WORKS AND TOP DRIVE. SIMOPS - SLIP AND CUT DRILL LINE. CEMENTING PLAN FORWARD BEING WORKED IN THE BACK GROUND. 3 WRAPS 44' 0.0 0.0 10/13/2022 15:00 10/13/2022 17:15 2.25 SLOT, PERF SVRG P CHANGE OUT TOP DRIVE SHOT PIN ASSEMBLEY. 0.0 0.0 10/13/2022 17:15 10/13/2022 17:30 0.25 SLOT, PERF RURD P R/U DDI CSG TONGS AND ELEVATORS 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 24/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/13/2022 17:30 10/13/2022 19:00 1.50 SLOT, PERF PUTB P M/U 3.5' MULE SHOE AND RIH W/ 3.5" TUBING AS PER DDI CSG. F/ SURFACE T/ 927' MD. S/O 60K MONITOR DISP. VIA TT. 0.0 927.0 10/13/2022 19:00 10/13/2022 21:00 2.00 SLOT, PERF TRIP P INSTALL XO'S AND RIH OUT OF DERRICK W/ 4" DP F/ 927' MD T/ 3113' MD P/U 79K, S/O 81K. MONITOR DISP. VIA TT. 927.0 3,113.0 10/13/2022 21:00 10/13/2022 21:30 0.50 SLOT, PERF RURD P M/U CEMENT SWIVEL AND CEMENT LINE 3,113.0 3,113.0 10/13/2022 21:30 10/13/2022 22:00 0.50 SLOT, PERF CIRC P CIRCULATE @ 250 GPM, 375 PSI, 20 RPM, 1K TQ, 390 TOTAL STKS, FLOOD LINE FROM CEMENTERS, PT LINE TO 2300 PSI, PJSM WITH CEMENT AND RIG CREW 3,113.0 3,113.0 10/13/2022 22:00 10/13/2022 22:30 0.50 SLOT, PERF CMNT P BATCH UP CEMENT AND MUD PUSH 3,113.0 3,113.0 10/13/2022 22:30 10/13/2022 23:00 0.50 SLOT, PERF CMNT P PUMP CEMENT AS PER PLAN FORWARD 14 BBL, 13.5 PPG MUD PUSH @ 4 BPM 21 BBL, 15.8 PPG CLASS G CEMENT @ 4 BPM 6 BBL, 13.5 PPG MUD PUSH @ 4 BPM 12 BBL, 9.8 PPG BRINE @ 4 BPM 5.2, BBL 9.8 BRINE @ 2 BPM NO LOSSES AND ROTATED THROUGHOUT CEMENT JOB 3,113.0 3,113.0 10/13/2022 23:00 10/13/2022 23:30 0.50 SLOT, PERF TRIP P POOH F/3,113' T/2,530' PUW=76K, MONITOR HOLE FILL VIA T.T 3,113.0 2,530.0 10/13/2022 23:30 10/14/2022 00:00 0.50 SLOT, PERF CIRC P CIRC & RECIP, F/2,530' T/2,435', @ 250 GPM, 198 PSI, 30 RPM, 1 K TQ, 36 % F.O, PUMP DOWN FOAM WIPER BALL AND CIRCULATE UNTIL CLEAN AT SHAKERS, DUMP 54 BBL MUD PUSH AND CONTAMINATED BRINE. (NO CEMENT OBSERVED AT SURFACE) 2,530.0 2,435.0 10/14/2022 00:00 10/14/2022 01:15 1.25 SLOT, PERF SQEZ P PERFORM LOWER HALO CEMENT SQUEEZE, SPACE OUT, SHUT ANNULAR, PUMP DOWN DRILL STRING TO SQUEEZE CEMENT, PRESSURE UP TO 250PSI W/ 5 STKS, BLEED OFF TO 127 PSI IN 15 MIN, CON'T TO KEEP PRESSURE @300 PSI, 1.3 BBLS, 13 TOTAL STKS, .5 BBL BLEED BACK TO T.T. .8 BBLS CEMENT TOTAL SQUEEZED INTO PERF'S. 2,530.0 2,530.0 10/14/2022 01:15 10/14/2022 01:45 0.50 SLOT, PERF CIRC P CIRC & RECIP F/2,530' T/2,440', 250 GPM, 217 PSI, 30 RPM, 1K TQ, 35% F.O 2,530.0 2,435.0 10/14/2022 01:45 10/14/2022 02:00 0.25 SLOT, PERF OWFF P OWFF (STATIC) SIMOPS - B/D TOP DRIVE 2,435.0 2,435.0 10/14/2022 02:00 10/14/2022 02:45 0.75 SLOT, PERF TRIP P POOH F/2,530' T/927', PUW=73K, MONITOR HOLE FILL VIA T.T 2,530.0 927.0 10/14/2022 02:45 10/14/2022 03:00 0.25 SLOT, PERF RURD P PJSM, SWAP HANDLING EQUIPMENT, RIG UP CASING TONGS 927.0 927.0 10/14/2022 03:00 10/14/2022 03:30 0.50 SLOT, PERF TRIP P POOH/ F927' T/0 RACKING BACK 3 1/2" TUBING IN DERRICK 927.0 0.0 10/14/2022 03:30 10/14/2022 06:00 2.50 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS - CLEAN AND CLEAR FLOOR, HOUSE KEEPING, WORK ORDERS, P.M.'S, 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 25/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/14/2022 06:00 10/14/2022 12:00 6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS - CLEAN AND CLEAR FLOOR, HOUSE KEEPING, WORK ORDERS, P.M.'S, SIMOPS OFFLOAD BRINE TO TANK FARM. CLEAN PITS AND PREP FOR LSND. MP2 ON KOOMEY. FILL BULK HYD. TANK ON RIG FLOOR. MP2 ON MUD PUMPS. BRING MPD BEARING SPOOL TO BOP DECK AND STAGE 0.0 0.0 10/14/2022 12:00 10/14/2022 18:00 6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS - CLEAN AND CLEAR FLOOR, HOUSE KEEPING, WORK ORDERS, P.M.'S, ONLOAD LSND MUD FROM TANK FARM INTO PITS 1-5. INSPECT RIG FLOOR KILL LINE DEMCO VALVE. PT VALVE T/ 3500 PSI. NO LEAKS. MP2 ON CENTRIFUGE AND DEGASSER. HOUSEKEEPING ON RIG FLOOR 0.0 0.0 10/14/2022 18:00 10/15/2022 00:00 6.00 SLOT, PERF WOC P W.O.C. (CIP 01:15 HRS) SIMOPS - CLEAN AND CLEAR FLOOR, HOUSE KEEPING, WORK ORDERS, P.M.'S, 0.0 0.0 10/15/2022 00:00 10/15/2022 00:30 0.50 SLOT, PERF SFTY P PJSM MAKE UP BAKER 7" SCRAPER CLEAN OUT ASSY AS PER BAKER TO 19' 0.0 19.0 10/15/2022 00:30 10/15/2022 01:30 1.00 SLOT, PERF TRIP P TIH F/19' TO 2568' S/O 81K 19.0 2,568.0 10/15/2022 01:30 10/15/2022 02:00 0.50 SLOT, PERF CIRC P CIRCULATING B/U F/ 2568' TO 2475' MD GPM 250 PSI 366 FLOW OUT 37% RPM 30 TQ 1K P/U 73K S/O 78K RT WT 78 K 2,568.0 2,475.0 10/15/2022 02:00 10/15/2022 02:45 0.75 SLOT, PERF WASH P WASH DOWN F/ 2568' TO 2632' TAG TOP CEMENT WITH 10K GPM 85 PSI 176 FLOW OUT 25% 2,568.0 2,632.0 10/15/2022 02:45 10/15/2022 03:30 0.75 SLOT, PERF WASH P WASH AND REAM CEMENT FROM 2632' TO 2700' OBSERVE CEMENT COMING SHAKERS SOFT AND MUSHY GPM 250 PSI 366 FLOW OUT 37% RPM 30 TQ 1K P/U 73K S/O 78K RT WT 78 K 2,568.0 2,700.0 10/15/2022 03:30 10/15/2022 04:00 0.50 SLOT, PERF CIRC P CIRC ROT AND RECIP F/ 2700' TO 2670' GPM 250 PSI 366 FLOW OUT 37% RPM 30 TQ 1K P/U 73K S/O 78K RT WT 78 K 2,700.0 2,700.0 10/15/2022 04:00 10/15/2022 04:15 0.25 SLOT, PERF TRIP P TOOH F/2700' TO 2377' P/U 76K MONTIORING HNOLE FILL AT TRIP TANK 2,700.0 2,377.0 10/15/2022 04:15 10/15/2022 06:00 1.75 SLOT, PERF CIRC P CIRCULATE @ 85 GPM 80 PSI WAITING ON CEMENT. 2,377.0 2,377.0 10/15/2022 06:00 10/15/2022 07:00 1.00 SLOT, PERF CIRC P RIH F/ 2377' T/ 2700', TAG CEMENT AGAIN W/12 K WOB. GPM = 85, PSI = 142, SET 12K DOWN. SOW = 81K, PUW = 76K 2,377.0 2,700.0 10/15/2022 07:00 10/15/2022 09:15 2.25 SLOT, PERF DRLG P DRILL CEMENT F/ 2700' T/ 2800', WOB = 8K, GPM = 254, PSI = 425, RPM = 30, TQ = 1-2K, FLOW OUT= 40%, P/U WT= 81K, S/O WT= 76K, RT WT= 78K. OBSERVE HARD CEMENT CUTTINGS ACROSS SHAKERS. 2,700.0 2,800.0 10/15/2022 09:15 10/15/2022 09:30 0.25 SLOT, PERF CIRC P CBU @ 254 GPM, 425 PSI, 30 RPM, 1- 2K TQ, 40% F/O. 755 STKS PUMPED 2,800.0 2,800.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 26/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/15/2022 09:30 10/15/2022 09:45 0.25 SLOT, PERF TRIP P TAG CEMENT @ 2800' MD 10K WOB. TAG WITNESS BY AOGCC REP. KAM ST. JOHN 2,800.0 2,800.0 10/15/2022 09:45 10/15/2022 10:15 0.50 SLOT, PERF DISP P DISP. WELL TO LSND 9.8PPG 255 GPM, 358 PSI, 30 RPM, 1K TQ, 35% F/O. 2,800.0 2,800.0 10/15/2022 10:15 10/15/2022 10:45 0.50 SLOT, PERF RURD P B/D TD R/U TO TEST CEMENT 2,800.0 2,800.0 10/15/2022 10:45 10/15/2022 11:30 0.75 SLOT, PERF PRTS P TEST CEMENT T/ 1500 PSI, 31 STKS PUMPED, CHARTED F/ 30 MIN.BLED BACK 2.8BBL TEST WITNESSED BY AOGCC REP. KAM ST. JOHN 2,800.0 2,800.0 10/15/2022 11:30 10/15/2022 12:00 0.50 SLOT, PERF RURD P R/D AND B/D TEST EQUIPMENT. LINE UP FOR FLUID SWAP. 2,800.0 2,800.0 10/15/2022 12:00 10/15/2022 12:15 0.25 SLOT, PERF DISP P SWAP WELL BACK TO 9.8 PPG BRINE @ 254 PSI, 556 PSI, 30 RPM, 1K TQ, 38% F/O. 2,800.0 2,800.0 10/15/2022 12:15 10/15/2022 12:30 0.25 SLOT, PERF OWFF P OWFF WELL STATIC 2,800.0 2,800.0 10/15/2022 12:30 10/15/2022 14:30 2.00 SLOT, PERF TRIP P POOH ON ELEVATOR RACKING BACK. F/ 2800' MD T/ SURFACE. L/D BAKER SCRAPER TOOL IN SHED. P/U 81K @ 2800' MD 2,800.0 0.0 10/15/2022 14:30 10/15/2022 15:15 0.75 SLOT, PERF SFTY P CLEAN AND CLEAR RIG FLOOR. PJSM ON RUNNING GUNS 0.0 0.0 10/15/2022 15:15 10/15/2022 15:30 0.25 SLOT, PERF BHAH P P/U M/U SLMB GUN ASSEMBLY. F/ SURFACE T/ 50' MD. 0.0 50.0 10/15/2022 15:30 10/15/2022 17:30 2.00 SLOT, PERF TRIP P RIH WITH GUNS ON 4" DP F/ 50 MD T/ 2772' MD @ 90'/MIN DOPING PIN END. S/O 81K. 80K P/U 50.0 2,772.0 10/15/2022 17:30 10/15/2022 17:45 0.25 SLOT, PERF PERF P DROP 5/8" BALL AS PER SLMB PUMP @ 1BPM 65 STKS. GUNS FIRED @ 2772' MD. (OA PRESS. STAYED STABLE. TOP OF PERF'S 2,730' / BOTTOM OF PERF'S 2,772' 2,772.0 2,772.0 10/15/2022 17:45 10/15/2022 18:45 1.00 SLOT, PERF CIRC P CIRCULATE B/U @ 1BPM, 1122 PSI - 994 PSI, 19% F/O. NO GAS OBSERVED ON B/U. 2,772.0 2,772.0 10/15/2022 18:45 10/15/2022 19:30 0.75 SLOT, PERF OWFF P OWFF 30 MIN (STATIC) SIMOPS - L/D PUP JT, P/U TOP JT OF DP, BLOW DOWN TOP DRIVE 2,772.0 2,772.0 10/15/2022 19:30 10/15/2022 21:00 1.50 SLOT, PERF TRIP P POOH F/2769' T/0', PUW= 76K, MONITOR HOLE FILL VIA T.T 2,769.0 0.0 10/15/2022 21:00 10/15/2022 21:15 0.25 SLOT, PERF RURD P CLEAN AND CLEAR RIG FLOOR, L/D FIRING HEAD, SWAP ELEVATORS PREP FOR CLEAN OUT RUN 0.0 0.0 10/15/2022 21:15 10/15/2022 21:45 0.50 SLOT, PERF BHAH P M/U BAKER CLEAN OUT BHA AS PER REP, RIH F/0' T/151' 0.0 151.0 10/15/2022 21:45 10/15/2022 23:00 1.25 SLOT, PERF TRIP P RIH F/151' T/2796', SOW=86K, MONITOR DISPLACEMENT VIA T.T 151.0 2,796.0 10/15/2022 23:00 10/15/2022 23:45 0.75 SLOT, PERF CIRC P ATTEMPT TO BREAK CIRCULATION, DRILL STRING PRESSURED UP TO 3412 PSI, BLEED OFF AND BLOW DOWN ALL SURFACE LINES, RIG UP CEMENT HOSE VIA HEAD PIN TO DRILL STRING, ATTEMPT TO CIRCULATE UNSUCCESSFUL, RIG DOWN LINES, BLOW DOWN, PREP FOR TRIP OUT OF THE HOLE 2,796.0 2,796.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 27/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/15/2022 23:45 10/16/2022 00:00 0.25 SLOT, PERF OWFF P OWFF 15 MIN (STATIC) 2,796.0 2,796.0 10/16/2022 00:00 10/16/2022 01:45 1.75 SLOT, PERF TRIP P POOH W/ 4" DP F/2796' T/ 151', RACK BACK IN DERRICK. MONITOR DISPLACEMENT VIA T.T. 2,796.0 151.0 10/16/2022 01:45 10/16/2022 02:30 0.75 SLOT, PERF BHAH P LAY DOWN CLEANOUT BHA F/ 151' T/ 0', INSPECT AND CLEAN. TAPERED MILL PORTS "PACKED OFF" WITH METAL DEBRIS 151.0 0.0 10/16/2022 02:30 10/16/2022 03:15 0.75 SLOT, PERF BHAH P MAKE UP CLEANOUT BHA F/ 0' T/ 147', M/U STND OF 4" DP, RIH T/ 242'. PUMP THRU BHA - GPM = 200, PSI = 45. "CLEAR 0.0 242.0 10/16/2022 03:15 10/16/2022 06:00 2.75 SLOT, PERF TRIP P RIH W/ 4" DP F/ 242' T/ 2387', S/O WT = xxK, BREAK CIRCULATION EVERY 10 STNDS, MONITOR DISPLACEMENT VIA T.T. 242.0 2,387.0 10/16/2022 06:00 10/16/2022 06:45 0.75 SLOT, PERF TRIP P RIH W/ 4" DP F/ 2387' T/ 2696', S/O WT = 81K, MONITOR DISPLACEMENT VIA T.T 2,387.0 2,696.0 10/16/2022 06:45 10/16/2022 07:00 0.25 SLOT, PERF WASH P WASH F/ 2696' MD T/ 2800' MD @ 2BPM, 128 PSI, TAGGING CEMENT. STAGE UP T/ 250 GPM, 450 PSI, 30 RPM, 1K TQ, 36% F/O. 819 STKS PUMPED 2,696.0 2,800.0 10/16/2022 07:00 10/16/2022 07:30 0.50 SLOT, PERF OTHR P SPACE OUT @ 2792' MD SHUT UPPER PIPE RAMS AND PERFORM INJ. TEST. 1/2 BPM, BREAKOVER @ 958 PSI, 12 STKS, 32 STKS TOTAL INJ. RATE 540 PSI @ 1/2 BPM. 2.6 BBL BLED BACK. (NO COMMUNICATION TO OA NOTICED) 2,792.0 2,792.0 10/16/2022 07:30 10/16/2022 08:30 1.00 SLOT, PERF CIRC P CBU @ 250 GPM, 450 PSI, 30 RPM, 1K TQ, 36% F/O. 691 STKS PUMPED 2,792.0 2,792.0 10/16/2022 08:30 10/16/2022 09:00 0.50 SLOT, PERF OWFF P B/D TD, OWFF 15 MIN. 2,792.0 2,792.0 10/16/2022 09:00 10/16/2022 10:30 1.50 SLOT, PERF TRIP P POOH W/ 4" DP RACKING BACK ON ELEVATORS F/ 2792' MD 147' MD. 81K P/U. MONITOR DISP. VIA TT. 2,792.0 147.0 10/16/2022 10:30 10/16/2022 12:00 1.50 SLOT, PERF BHAH P LAY DOWN YELLOWJACKET/BAKER BHA F/ 147'MD SURFACE. CLEAN SWARF FROM MAGNETS 147.0 0.0 10/16/2022 12:00 10/16/2022 13:00 1.00 SLOT, PERF BHAH P CLEAN AND CLEAR RIG FLOOR, L/D YELLOWJACKET/BAKER HANDLING EPUIPMENT AND TOOLS 0.0 0.0 10/16/2022 13:00 10/16/2022 13:30 0.50 SLOT, PERF TRIP P R/U DOYON CASING POWER TONGS, M/U MULESHOE AND 3 1/2 TUBING FROM SURFACE TO 927' MD 0.0 927.0 10/16/2022 13:30 10/16/2022 15:00 1.50 SLOT, PERF TRIP P RIH ON 4" DP OUT OF DERRICK. F/ 927' T/ 2800' (TAG CEMENT) MD MONITOR DISP VIA TT. S/O 76K. 927.0 2,800.0 10/16/2022 15:00 10/16/2022 15:45 0.75 SLOT, PERF TRIP P SPACE OUT @ 2799' MD P/U M/U BAKER CEMENT SWIVEL. RIG UP SLMB CEMENTERS. ESTABLISH CIRC. RATES. 2,800.0 2,799.0 10/16/2022 15:45 10/16/2022 16:15 0.50 SLOT, PERF CMNT P FLOOD LINES PT LINES T/ 2000 PSI. CHARTED. BATCH UP CEMENT 2,799.0 2,799.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 28/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/16/2022 16:15 10/16/2022 16:45 0.50 SLOT, PERF CMNT P @ 30 RPM, 1K TQ, PUMP 14BBL OF 13.5 PPG MUD PUSH, @ 4BPM, 260 PSI, 32% F/O. PUMP 25BBL OF 15.8 PPG CEMENT @ 4 BPM, 250 PSI, 36 % F/O. PUMP 6BBL 13.5 PPG MUD PUSH @ 4BPM 170 PSI, 29% F/O. PUMP 7BBL 9.8 PPG BRINE @ 4 BPM, 120 PSI, 29 % F/O. PUMP 3.5BBL OF 9.8 PPG, @ 2BPM, 110 PSI, 22% F/O. 2,799.0 2,799.0 10/16/2022 16:45 10/16/2022 17:00 0.25 SLOT, PERF RURD P L/D BAKER CEMENT SWIVEL, SIMOPS CLEAN CEMENT VALVES 2,799.0 2,799.0 10/16/2022 17:00 10/16/2022 17:30 0.50 SLOT, PERF TRIP P POOH ON ELEVATORS F/ 2799' MD T/ 2249' MD @ 45 FPM, 71K P/U. MONITOR DISP. VIA TT. INSPECT PIPE FOR CEMENT RINGS 2,799.0 2,249.0 10/16/2022 17:30 10/16/2022 18:15 0.75 SLOT, PERF CIRC P DROP NERF BALL, ROT AND RECP. @ 254 GPM, 243 PSI, 30 RPM, 1K TQ, F/O 35% 3068 STKS PUMPED 2,249.0 2,249.0 10/16/2022 18:15 10/16/2022 20:15 2.00 SLOT, PERF SQEZ P SQUEEZE CEMENT AS PER PLAN FORWARD, SPACE OUT AND CLOSE ANNULAR,PRESSURE UP TO 600PSI, 5 STKS, HOLD 15 MIN, PUMP UP TO 700 PSI, 2 STKS, HOLD 15 MIN, PUMP UP TO 800 PSI, 2 STKS, HOLD 15 MIN, PUMP UP TO 800 PSI, 1 STKS, HOLD FOR 45 MIN, 10 TOTAL STKS PUMP, 1/2 BBL BLEED BACK TO T.T 2,249.0 2,249.0 10/16/2022 20:15 10/16/2022 20:45 0.50 SLOT, PERF CIRC P ROT AND RECP. @ 250 GPM, 198 PSI, 30 RPM, 1K TQ, F/O 35% 1100 STKS PUMPED 2,249.0 2,249.0 10/16/2022 20:45 10/16/2022 21:00 0.25 SLOT, PERF OWFF P BLOW DOWN TOP DRIVE, 15 MIN FLOW CHECK AS PER CO MAN 2,249.0 2,249.0 10/16/2022 21:00 10/16/2022 21:45 0.75 SLOT, PERF TRIP P POOH F/2249' T/928' PUW=65K, MONITOR HOLE FILL VIA T.T 2,249.0 928.0 10/16/2022 21:45 10/16/2022 22:00 0.25 SLOT, PERF RURD P SWAP HANDLING EQUIPMENT AND RIG UP CASING TONGS 928.0 928.0 10/16/2022 22:00 10/16/2022 22:30 0.50 SLOT, PERF TRIP P POOH F/928' T/0' RACKING BACK 3 1/2 TUBING IN DERRICK 928.0 0.0 10/16/2022 22:30 10/17/2022 00:00 1.50 SLOT, PERF CLEN P CLEAN AND CLEAR RIG FLOOR, M/U STACK WASH TOOL TO 1 STD OF DP, CON'T WITH HOUSE KEEPING AND MP2'S 0.0 0.0 10/17/2022 00:00 10/17/2022 06:00 6.00 SLOT, PERF CLEN P CLEAN AND CLEAR RIG FLOOR, M/U STACK WASH TOOL TO 1 STD OF DP, CON'T WITH HOUSE KEEPING AND MP2'S 0.0 0.0 10/17/2022 06:00 10/17/2022 07:15 1.25 SLOT, PERF RURD P RIG UP TESTING EQUIPMENT. 4" TIW'S, DART, TEST HOSES AND CHECK SENSATORS ON TEST CHART. SIMOPS DRAIN STACK 0.0 0.0 10/17/2022 07:15 10/17/2022 10:00 2.75 SLOT, PERF WWWH P PULL WEAR RING AS PER FMC REP. R/U JOHNNY WHACK STACK. FUNCTION RAMS AS PER SOP. RE DRAIN STACK, AND INSTALL TEST PLUG 0.0 0.0 10/17/2022 10:00 10/17/2022 10:45 0.75 SLOT, PERF BOPE P FLOOD LINES AND PERFORM SHELL TEST TO 4200 PSI. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 29/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/17/2022 10:45 10/17/2022 12:00 1.25 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 4,200 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI, W/ 4" TEST JT TEST ANNULAR W/ 4" TJ T/ 4200 PSI, 3 1/2" X 6" UPR, 3 1/2" X 6" LPR, W/ 3 1/2" TEST JT TEST 3 1/2" X 6" UPR & 3 1/2" X 6" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 2X 4" FOSV, 4" DART VALVE; BLIND/ SHEAR RAMS; 0.0 0.0 10/17/2022 12:00 10/17/2022 16:00 4.00 SLOT, WHDBOP BOPE P CONT. TEST BOPE ALL TESTS T/ 250 LOW 4,200 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 3 1/2" TEST JT TEST ANNULAR T/ 3500 PSI, 3 1/2" X 6" UPR, 3 1/2" X 6" LPR, W/ 3 1/2" TEST JT TEST 3 1/2" X 6" UPR & 3 1/2" X 6" LPR T/ 4200 PSI, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 2X 4" FOSV, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3000 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI AFTER ALL FUNCTIONS ON BOTTLES, 9 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 70 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 20 SEC. UPR = 16 SEC. BLIND / SHEARS = 16 SEC. LPR = 16 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP KAM ST. JOHN WAIVED WITNESS @ 10:36 HRS on 10/14/22 UPPER IBOP FAIL, BLIND RAMS FAIL/PASS. 0.0 0.0 10/17/2022 16:00 10/17/2022 16:45 0.75 SLOT, WHDBOP RURD P REMOVE TJ AND TEST PLUG. DRAIN STACK AND INSTALL WEAR RING AS PER FMC REP 0.0 0.0 10/17/2022 16:45 10/17/2022 17:15 0.50 SLOT, WHDBOP RURD P R/D B/D TESTING EQUIPMENT. BLOW DWN CHK AND KILL. 0.0 0.0 10/17/2022 17:15 10/17/2022 18:00 0.75 SLOT, WHDBOP EQRP P PREP TOP DRIVE FOR UPPER IBOP AND SAVER SUB REMOVAL 0.0 0.0 10/17/2022 18:00 10/17/2022 21:30 3.50 SLOT, WHDBOP RGRP T INSTALL NEW UPPER IBOP AND XT- 39 SAVER SUB AS PER SOP, TORQUE TO 45K, 3X'S, WINTNESSED BY TOUR PUSHER 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 30/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/17/2022 21:30 10/18/2022 00:00 2.50 SLOT, WHDBOP BOPE P CLEAN AND CLEAR RIG FLOOR, PREP FOR TEST, TEST UPPER IBOP, 250 PSI, 4200 PSI, 5 MIN EACH, "CHARTED" 0.0 0.0 10/18/2022 00:00 10/18/2022 00:15 0.25 SLOT, CSGRCY RURD P R/D TEST EQUIPMENT, BLOW DOWN TO[P-DRIVE AND CHOKE LINE PREP RIG FLOOR FOR BHA 0.0 0.0 10/18/2022 00:15 10/18/2022 01:45 1.50 SLOT, CSGRCY TRIP P PJSM M/U BAKER CLEAN OUT ASSY TIH 0' TO 2257' 0.0 2,257.0 10/18/2022 01:45 10/18/2022 02:15 0.50 SLOT, CSGRCY CIRC P CIRCULATE B/U @ 2257' 250 GPM 270 PSI 30 RPM 1K TQ 38% F/O 2,257.0 2,257.0 10/18/2022 02:15 10/18/2022 06:00 3.75 SLOT, CSGRCY REAM P WASH AND REAM CEMENT FROM 2257' TO 2474' 250 GPM 270 PSI 30 RPM 1K TQ 2-5K WOB 36 % F/O 2,257.0 2,474.0 10/18/2022 06:00 10/18/2022 09:45 3.75 SLOT, CSGRCY REAM P WASH AND REAM CEMENT F/2,474' T/2,675', 300 GPM, 550 PSI, 50 RPM, 1 -2K TQ, 7-8K WOB, 40% F.O 2,474.0 2,675.0 10/18/2022 09:45 10/18/2022 10:00 0.25 SLOT, CSGRCY CIRC P CIRCULATE, ROT & RECIP UNTIL SHAKERS CLEAN F/ 2,672‘ T/ 2,653‘, W/ GPM = 250, PSI = 275, FLOW OUT = 39%, RPM = 30, TQ = 1-2K, P/U RT WT = 75K, S/O RT WT = 81K, RT WT = 76K, TOTAL PUMPED STKS = 705 2,257.0 2,474.0 10/18/2022 10:00 10/18/2022 10:30 0.50 SLOT, CSGRCY CIRC P DISP. WELL OVER TO 9.8PPG LSND MUD @ 250 GPM, 307 PSI, 37% F/O, 30 RPM, 1K TQ, 1032 STKS PUMPED. 2,257.0 2,474.0 10/18/2022 10:30 10/18/2022 11:00 0.50 SLOT, CSGRCY OTHR P 10K TAG CEMENT TAG WITNESSED BY AOGCC REP GUY COOK. SPACE OUT @ 2664' AND RIG UP TO TEST CEMENT. 2,675.0 2,664.0 10/18/2022 11:00 10/18/2022 12:00 1.00 SLOT, CSGRCY PRTS P PRESSURE TEST CEMENT T/ 1500 PSI CHARTED FOR 30 MIN. 19 STKS PUMPED. 1.7 BBL BLED BACK TEST WITNESSED BY AOGCC REP GUY COOK. 2,664.0 2,664.0 10/18/2022 12:00 10/18/2022 12:30 0.50 SLOT, CSGRCY RURD P R/D AND B/D TEST EQUIPMENT. PREP FOR FLUID SWAP 2,664.0 2,664.0 10/18/2022 12:30 10/18/2022 13:00 0.50 SLOT, CSGRCY CIRC P DISP. WELL OVER TO 9.8PPG BRINE @ 250 GPM, 315 PSI, 37% F/O, 30 RPM, 1K TQ, 1233 STKS PUMPED 2,664.0 2,664.0 10/18/2022 13:00 10/18/2022 13:30 0.50 SLOT, CSGRCY OWFF P B/D TD OWFF F/ 15 MIN. 2,664.0 2,664.0 10/18/2022 13:30 10/18/2022 14:45 1.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS RACKING BACK. F/ 2664 T/ 19' MD. MONITOR DISP VIA TT. 2,664.0 19.0 10/18/2022 14:45 10/18/2022 15:30 0.75 SLOT, CSGRCY BHAH P L/D BAKER BHA AS PER BAKER REP. F/ 19' MD T/ SURFACE 19.0 0.0 10/18/2022 15:30 10/18/2022 16:30 1.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR. L/D BAKER BHA DWN SLIDE AND PICK NEW BAKER BHA. 0.0 0.0 10/18/2022 16:30 10/18/2022 17:30 1.00 SLOT, CSGRCY BHAH P M/U BAKER BHA AND 9 JTS OF 4" HWDP F/ SURFACE T/ 287' MD. 0.0 287.0 10/18/2022 17:30 10/18/2022 18:15 0.75 SLOT, CSGRCY TRIP P RIH W/ 4" DP OUT OF DERRICK F/ 287' MD T/ 1900' MD, 90 FT/MIN, MONITOR DISP VIA TT. 287.0 1,900.0 10/18/2022 18:15 10/18/2022 19:00 0.75 SLOT, CSGRCY TRIP P RIH W/ 4" DP OUT OF DERRICK F/ 1900' MD T/ 2675' MD, 90 FT/MIN, MONITOR DISP VIA TT. SOW= 70K, PUW= 79K 1,900.0 2,675.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 31/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/18/2022 19:00 10/18/2022 19:15 0.25 SLOT, CSGRCY CIRC P FILL PIPE, 2 BPM, 169 PSI, CIRCUALTE @ 123 GPM, 342 PSI, 29 % F.O, 1280 TOTAL STKS PUW= 82K, SOW= 83K, 60 RPM, 1K TQ, 90 RPM, 1K TQ SPR'S PUMP #1, 20SPM/220PSI, 30SPM/420PSI, PUMP #2, 20SPM/200PSI, 30SPM/420PSI 2,675.0 2,675.0 10/18/2022 19:15 10/18/2022 20:00 0.75 SLOT, CSGRCY CUTP P LOCATE COLLAR IN 7" CASING AS PER REP @ 2,640', PERFORM CUT @ 2,635', 90RPM, PSI 740, DROPPED TO 600PSI, SET DOWN 5K TO VERIFY 2,675.0 2,640.0 10/18/2022 20:00 10/18/2022 20:45 0.75 SLOT, CSGRCY CIRC P SPACE OUT AND CLOSE UPPER VBR'S, ATTEMPT TO CIRCULATE W/OA UNSUCCESSFUL, PRESSURE UP TO 460 PSI, 3 TOTAL STKS 2,640.0 2,617.0 10/18/2022 20:45 10/18/2022 21:00 0.25 SLOT, CSGRCY TRIP P L/D WORKING SINGLE, POOH F/2,617' T/2,367' PUW= 80K, MONITOR HOLE FILL VIA T.T 2,617.0 2,367.0 10/18/2022 21:00 10/18/2022 21:30 0.50 SLOT, CSGRCY CUTP P LOCATE COLLAR IN 7" CASING AS PER REP @ 2,360', PERFORM CUT @ 2,363', 90RPM, PSI 820, DROPPED TO 760PSI, SET DOWN 5K TO VERIFY 2,360.0 2,363.0 10/18/2022 21:30 10/18/2022 22:00 0.50 SLOT, CSGRCY CIRC P SPACE OUT, CLOSE UPPER VBR'S, DISPLACE OA TO TIGER TANK @150 GPM, 784 PSI, 1005 TOTAL STKS PUMPED, 100BBL RECIEVED TO TIGER TANK, 9.8BRINE OBSERVED AT CHOKE HOUSE 2,363.0 2,363.0 10/18/2022 22:00 10/18/2022 22:45 0.75 SLOT, CSGRCY CIRC P CIRCULATE @ 2,363', 170 GPM, 660 PSI, 32% F.O, 970 TOTAL STKS PUMPED 2,363.0 2,363.0 10/18/2022 22:45 10/18/2022 23:00 0.25 SLOT, CSGRCY CUTP P VERIFY CUT WAS MADE, ROTATE @ 90 RPM, 4BPM, 750 PSI 2,363.0 2,363.0 10/18/2022 23:00 10/18/2022 23:30 0.50 SLOT, CSGRCY CIRC P CIRCULATE @ 2,363', 170 GPM, 620 PSI, 28% F.O, 800 TOTAL STKS PUMPED 2,363.0 2,363.0 10/18/2022 23:30 10/19/2022 00:00 0.50 SLOT, CSGRCY OWFF P L/D WORKING SINGLE, BLOW DOWN TOP DRIVE, 30 MIN FLOW CHECK ON T.T AS PER CO MAN 2,330.0 2,330.0 10/19/2022 00:00 10/19/2022 01:30 1.50 SLOT, CSGRCY TRIP P TOOH F/ 2364' TO SURFACE , P/U 80K MONITOR HOLE FILL VIA TT. INSPECT AND L/D CUTTER AS PER BAKER REP, KNIVES BLADES SHOWED WORN. 2,364.0 0.0 10/19/2022 01:30 10/19/2022 03:30 2.00 SLOT, CSGRCY OTHR P DRAIN STACK PULL WEAR RING AS PER FMC REP FUNCTIONAL ALL RAMS AND ANNULAR ASA PER SOP WASH STACK AT MAX RATE, DRAIN STACK SET TEWST PLUG SIMOPS PREP RAMS CHANGING REMOVE UPPER VBR'S AND INSTALL 7" SOLID BODY RAMS MONITORING WELL AT OA 0.0 0.0 10/19/2022 03:30 10/19/2022 04:00 0.50 SLOT, CSGRCY BOPE P M/U TEST JOINT AS PER FMC REP FLOOD STACK AND SURFACE LINES WITH H2O PREP FOR BOP TEST. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 32/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/19/2022 04:00 10/19/2022 05:30 1.50 SLOT, CSGRCY PRTS P TEST 7" RAMS 250 /4200 TEST ANNULAR 250/4200 ON CHART 5 MIN LOW AND5 MIN HIGH ON CHART 0.0 0.0 10/19/2022 05:30 10/19/2022 06:00 0.50 SLOT, CSGRCY WWSP P PULL 7" PACKOFF AS PER FMC 0.0 0.0 10/19/2022 06:00 10/19/2022 07:15 1.25 SLOT, CSGRCY RURD P RIG DOWN TESTING EQUIPMENT. PULL WEAR RING AS PER FMC AND DRAIN STACK. BLOW DOWN KILL LINE. 0.0 0.0 10/19/2022 07:15 10/19/2022 09:00 1.75 SLOT, CSGRCY OWFF P VERIFY OA PRESSURE IS ZERO PSI. M/U PACK OFF RUNNING TOOL AND PULL PACK OFF AS PER FMC. 7K TO PULL PACKOFF 0.0 0.0 10/19/2022 09:00 10/19/2022 09:45 0.75 SLOT, CSGRCY PULL P INSTALL AND M/I LANDING JOINT AS PER FMC REP. RIG UP INSTALL X/O'S AND P/U 94K BREAKOVER 0.0 39.0 10/19/2022 09:45 10/19/2022 10:15 0.50 SLOT, CSGRCY CIRC P CIRC. STS STKS @ 300 GPM, 233 PSI, 38% F/O. 2053 STKS PUMPED 0.0 0.0 10/19/2022 10:15 10/19/2022 11:00 0.75 SLOT, CSGRCY OWFF P OWFF F/30 MIN 0.0 0.0 10/19/2022 11:00 10/19/2022 11:15 0.25 SLOT, CSGRCY RURD P RIG DWN X/O'S AND PUMPING SUB. B/D FILL LINE. RIG UP DDI CSG. 0.0 0.0 10/19/2022 11:15 10/19/2022 11:30 0.25 SLOT, CSGRCY PULL P PULL LANDING JOINT AND HANGER AND LAY DOWN. POOH F/ 2363' MD T/ 2318' MD P/U 94K. 2,363.0 2,318.0 10/19/2022 11:30 10/19/2022 12:00 0.50 SLOT, CSGRCY PULL P POOH LAYING DOWN 7" CSG WITH DDI CSG. F/ 2318' MD T/ 2268' MD. MONITOR DISP. VIA TT 2,318.0 2,268.0 10/19/2022 12:00 10/19/2022 12:15 0.25 SLOT, CSGRCY PULL P POOH LAYING DOWN 7" CSG WITH DDI CSG. F/ 2268' MD T/ 2241' MD. MONITOR DISP. VIA TT. DISP OFF. HOLE SWABBING 2,268.0 2,241.0 10/19/2022 12:15 10/19/2022 12:45 0.50 SLOT, CSGRCY PULL P M/U X/O'S. AND CBU @ 415 GPM, 168 PSI, 50% F/O. RICP. PIPE F/ 2241' MD T/ 2002' MD. S/O 90K P/U 84K @ FULL RATE 1150 STKS PUMPED. ATTEMPT TO POOH ON ELEVATORS. SWABBING NOTED 2,241.0 2,002.0 10/19/2022 12:45 10/19/2022 13:00 0.25 SLOT, CSGRCY CIRC P CBU @ 500 GPM, 182 PSI, 51% F/O. ROT 10 RPM, 1K TQ, RICP. PIPE F/ 2241' MD T/ 2002' MD. S/O 90K P/U 84K, 84K ROT @ FULL RATE 1150 STKS PUMPED 2,241.0 2,002.0 10/19/2022 13:00 10/19/2022 13:30 0.50 SLOT, CSGRCY PULL P ATTEMPT. TO PULL ON ELEVATORS. SWABBING STILL NOTED. 93K P/U 2,002.0 2,002.0 10/19/2022 13:30 10/19/2022 15:30 2.00 SLOT, CSGRCY RURD P SHUT DOWN. RIG UP VOLANT AS PER DDI CSG REP 2,002.0 2,002.0 10/19/2022 15:30 10/19/2022 18:00 2.50 SLOT, CSGRCY PMPO P PUMP OUT THE HOLE F/ 2002' MD T/ 1550' MD 2BPM, 146 PSI, 24% F/O, 77K P/U 2,002.0 1,550.0 10/19/2022 18:00 10/19/2022 20:45 2.75 SLOT, CSGRCY PMPO P PUMP OUT THE HOLE F/ 1550' MD T/ 0' MD 2BPM, 25 PSI, 24% F/O, 57 JTS AND A 3' CUT JT LAID DOWN TO PIPE SHED, 27 CENTRALIZERS REMOVED 1,550.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 33/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/19/2022 20:45 10/19/2022 22:00 1.25 SLOT, CSGRCY WASH P RIG DOWN CASING EQUIPMENT, CLEAN AND CLEAR RIG FLOOR, PREP FOR RAM CHANGE, M/U STACK WASHER AND WASH STACK AT MAX RATE AS PER SOP, BLOW DOWN TD AND MUDLINE 0.0 0.0 10/19/2022 22:00 10/19/2022 23:30 1.50 SLOT, CSGRCY OTHR P DRAIN STACK, FLUSH LINES W/H20, SHUT BLIND RAMS AND BLEED OFF KOOMEY, REMOVE 7" SOLID BODY RAMS AND INSTALL UPPER VBR'S AS PER SOP 0.0 0.0 10/19/2022 23:30 10/20/2022 00:00 0.50 SLOT, CSGRCY OTHR P SET TEST PLUG W/5" TEST JT AS PER FMC REP, FLOOD STACK W/H20 AND FLUID PACK LINES 0.0 0.0 10/20/2022 00:00 10/20/2022 01:00 1.00 SLOT, CSGRCY PRTS P TEST 3.5" X 6"VBR'S W/ 3.5" PIPE AND 5" PIPE 250/4200 PSI ON CHART 5 MIN LOW AND HIGH TEST 0.0 0.0 10/20/2022 01:00 10/20/2022 02:00 1.00 SLOT, CSGRCY RURD P PULL TEST PLUG AND L/D TEST JT AS PER FMC HAND BLOW DOWN CJHOKE AND KILL LINES CLEAN AND CLEAR RIG FLOOR 0.0 0.0 10/20/2022 02:00 10/20/2022 02:30 0.50 SLOT, CSGRCY BHAH P M/U 9 5/8" SCRFAPPER ASSY W/ 8 3/4" ROCK BIT 0.0 10.0 10/20/2022 02:30 10/20/2022 03:30 1.00 SLOT, CSGRCY TRIP P TIH W/ 4" DRILL PIPE F/ 10' TO 2090' ' SO 75K P/U 75K MONITOR DISPLACEMENT VIA TT 10.0 2,090.0 10/20/2022 03:30 10/20/2022 04:15 0.75 SLOT, CSGRCY WASH P WASH DOWN F/ 2090' TO 2363' TAG TOF W/ 3K 250GPM 179+ PSI 34% F/O SOW 754K 2,090.0 2,363.0 10/20/2022 04:15 10/20/2022 04:45 0.50 SLOT, CSGRCY CIRC P CIRCULATE B/U 2360' 381 GPM 433 PSI 2,360.0 2,360.0 10/20/2022 04:45 10/20/2022 05:00 0.25 SLOT, CSGRCY OWFF P OWFF WELL STATIC 2,360.0 2,360.0 10/20/2022 05:00 10/20/2022 06:00 1.00 SLOT, CSGRCY TRIP P TOOH FROM 2360' TO 0' 2,360.0 0.0 10/20/2022 06:00 10/20/2022 08:00 2.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR. REMOVE ROTARY TABLE COVER AND CLEAN DRIP PAN. WAIT FOR WIRELINE. SIMOPS LOAD 15 JTS OF 5" HWDP IN SHED. 0.0 0.0 10/20/2022 08:00 10/20/2022 09:00 1.00 SLOT, CSGRCY RURD P LOAD WIRELINE TOOLS IN SHED. M/U SHEAVES T BAR 0.0 0.0 10/20/2022 09:00 10/20/2022 10:00 1.00 SLOT, CSGRCY ELOG P M/U WIRE LINE TOOLS AS PER SLMB. REPS F/ SURFACE T/ 54' MD. FUNCTION TEST TOOLS 0.0 54.0 10/20/2022 10:00 10/20/2022 12:00 2.00 SLOT, CSGRCY ELOG P RIH WITH SLMB. USIT LOG F/ 54' T/2360' MD 54.0 2,360.0 10/20/2022 12:00 10/20/2022 14:30 2.50 SLOT, CSGRCY ELOG P CONT. WITH SLMB. USIT LOG F/ 54' T/2360' MD 54.0 2,360.0 10/20/2022 14:30 10/20/2022 15:15 0.75 SLOT, CSGRCY ELOG P R/D & L/D WIRELINE 0.0 0.0 10/20/2022 15:15 10/20/2022 15:45 0.50 SLOT, CSGRCY ELOG P CLEAN AND ORGANIZE RIG FLOOR. P/U BAKER FISHING SPEAR TOOLS TO RIG FLOOR. 0.0 0.0 10/20/2022 15:45 10/20/2022 18:45 3.00 SLOT, CSGRCY ELOG P M/U BAKER SPEAR PACKOFF AS PER BAKER REP F/ SURFACE T/ 520' MD. S/O 73K MONITOR DISP. VIA TT. 0.0 520.0 10/20/2022 18:45 10/20/2022 19:00 0.25 SLOT, CSGRCY ELOG P M/U X/O, C/O HANDLING EQUIPMENT FROM 5" T/ 4" 520.0 520.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 34/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/20/2022 19:00 10/20/2022 20:00 1.00 SLOT, CSGRCY TRIP P RIH ON 4" DP F/ 520' MD T/ 2,316' MD. MONITORING DISPLACEMENT VIA TRIP TANK. S/O WT= 92K, P/U WT= 88K 520.0 2,316.0 10/20/2022 20:00 10/20/2022 20:15 0.25 SLOT, CSGRCY TRIP P RIH F/ 2,316' MD T/ 2,369' MD. @ 2,369' MD SET 10K WOB, CONFIRM SPEAR IN CSG 2,316.0 2,363.0 10/20/2022 20:15 10/20/2022 20:30 0.25 SLOT, CSGRCY FISH P JAR 10 TIMES. SET DOWN T/ 70K, PULL UP AND FIRE JARS AT 260K, PULL UP TO 300K AND CHECK PROGRESS. MADE NO PROGRESS 2,363.0 2,363.0 10/20/2022 20:30 10/20/2022 21:15 0.75 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION. PRESSURE UP T/ 400 PSI, NO BLEED OFF OR COMMUNICATION OBSERVED 2,363.0 2,363.0 10/20/2022 21:15 10/20/2022 21:30 0.25 SLOT, CSGRCY FISH P CONT. TO JAR 10 TIMES. SET DOWN T/ 70K, PULL UP AND FIRE JARS AT 260K, PULL UP TO 300K AND CHECK PROGRESS. MADE NO PROGRESS 2,363.0 2,363.0 10/20/2022 21:30 10/20/2022 22:00 0.50 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION. PRESSURE UP T/ 400 PSI, NO BLEED OFF OR COMMUNICATION OBSERVED 2,363.0 2,363.0 10/20/2022 22:00 10/20/2022 22:15 0.25 SLOT, CSGRCY FISH P CONT. TO JAR 10 TIMES. SET DOWN T/ 70K, PULL UP AND FIRE JARS AT 260K, PULL UP TO 300K AND CHECK PROGRESS. MADE NO PROGRESS 2,363.0 2,363.0 10/20/2022 22:15 10/20/2022 22:30 0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION. PRESSURE UP T/ 400 PSI, NO BLEED OFF OR COMMUNICATION OBSERVED. 2,363.0 2,363.0 10/20/2022 22:30 10/20/2022 23:00 0.50 SLOT, CSGRCY FISH P CONT. TO JAR 20 TIMES. SET DOWN T/ 52K, PULL UP AND FIRE JARS AT 270K, PULL UP TO 320K AND CHECK PROGRESS. MADE NO PROGRESS 2,363.0 2,363.0 10/20/2022 23:00 10/20/2022 23:15 0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION. PRESSURE UP T/ 400 PSI, NO BLEED OFF OR COMMUNICATION OBSERVED 2,363.0 2,363.0 10/20/2022 23:15 10/20/2022 23:45 0.50 SLOT, CSGRCY FISH P CONT. TO JAR 20 TIMES. SET DOWN T/ 52K, PULL UP AND FIRE JARS AT 270K, PULL UP TO 320K AND CHECK PROGRESS. MADE NO PROGRESS 2,363.0 2,363.0 10/20/2022 23:45 10/21/2022 00:00 0.25 SLOT, CSGRCY OTHR P PERFORM DERRICK INSPECTION. PRESSURE UP T/ 400 PSI, NO BLEED OFF OR COMMUNICATION OBSERVED. 2,363.0 2,363.0 10/21/2022 00:00 10/21/2022 00:15 0.25 SLOT, CSGRCY OTHR P CONT. DERRICK INSPECTION PRESSURE UP 400 PSI NO BLEED OR COMMUNICTION OBSERVED 2,363.0 2,363.0 10/21/2022 00:15 10/21/2022 01:00 0.75 SLOT, CSGRCY FISH P RELEASE BAKER SPEAR FROM 7" CASING FISH AS PER BAKER REP 2,363.0 2,363.0 10/21/2022 01:00 10/21/2022 01:45 0.75 SLOT, CSGRCY CIRC P POOH TO 2360' CIRC B/U P/U 89K FLOW OUT 32 % 1929 STROKES PUMPED 2,363.0 2,360.0 10/21/2022 01:45 10/21/2022 02:30 0.75 SLOT, CSGRCY OWFF P OWFF WELL STATIC BLOW DOWN TOP DRIVE 2,363.0 2,363.0 10/21/2022 02:30 10/21/2022 03:45 1.25 SLOT, CSGRCY TRIP P TOOH RACKING BACK 4" DRILL PIPE F/ 2360 TO 520' P/U 64K 2,363.0 520.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 35/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/21/2022 03:45 10/21/2022 04:00 0.25 SLOT, CSGRCY RURD P INSTALL XO O 4" TIW CHANGE OUT HANDLING EQUIP TO 5" 520.0 520.0 10/21/2022 04:00 10/21/2022 05:00 1.00 SLOT, CSGRCY TRIP P TOOH F/ 520' RACKING BACK 5" HWDP AND JARS TO SURFACE P/U 40K L/D BAKER SPEAR ASSY INSPECTED SAME 520.0 0.0 10/21/2022 05:00 10/21/2022 06:00 1.00 SLOT, CSGRCY OWFF P DERRICK INSPECTION AND PAPER WORK / WHILE OWFF WELL VIA TT 0.0 0.0 10/21/2022 06:00 10/21/2022 07:15 1.25 SLOT, CSGRCY OWFF P DERRICK INSPECTION AND PAPER WORK / WHILE OWFF WELL VIA TT 0.0 0.0 10/21/2022 07:15 10/21/2022 08:00 0.75 SLOT, CSGRCY WWWH P INSTALL WEAR RING AS PER FMC. REP 0.0 0.0 10/21/2022 08:00 10/21/2022 08:30 0.50 SLOT, CSGRCY BHAH P M/U BAKER BHA AS PER BAKER BHA. F/ SURFACE T/ 287' MD 0.0 287.0 10/21/2022 08:30 10/21/2022 09:45 1.25 SLOT, CSGRCY TRIP P CONT. RIH F/ 287' MD T/ 2372' MD 76K S/O, 73K P/U. MONITOR DISP. VIA TT. 287.0 2,373.0 10/21/2022 09:45 10/21/2022 10:30 0.75 SLOT, CSGRCY WAIT P WAIT ON ORDERS FROM TOWN 2,373.0 2,373.0 10/21/2022 10:30 10/21/2022 12:00 1.50 SLOT, CSGRCY TRIP P RIH F/ 2372' MD T/ 2473' MD FILL PIPE,240 STKS. STAGE PUMPS UP TO 152 GPM, 503 PSI, 30% F/O. RICP. PIPE F/ 2465' MD T/ 2535' MD. ATTEMPTING TO LOCATE COLLAR 2,373.0 2,473.0 10/21/2022 12:00 10/21/2022 12:30 0.50 SLOT, CSGRCY FISH P SPACE OUT AND CUT CSG AS PER BAKER REP @ 2490' MD. 90 RPM, 1K TQ, 195 GPM, 803 PSI, PRESSURE DROP T/ 628 PSI. SET DWN 5K TO VERIFY CSG IS CUT. PRESS. DROP T/ 233 PSI. ROT 85K P/U 82K, S/O 84K 2,490.0 2,490.0 10/21/2022 12:30 10/21/2022 13:45 1.25 SLOT, CSGRCY TRIP P PULL OUT HOLE F/ 2490' MD T/ 2462' MD P/U 86K AND CBU @ 195 GPM, 786 PSI, 0 RPM, 30 % F/O. 2,490.0 2,462.0 10/21/2022 13:45 10/21/2022 14:00 0.25 SLOT, CSGRCY OWFF P B/D T/D OWFF, 15 MIN 2,462.0 2,462.0 10/21/2022 14:00 10/21/2022 16:15 2.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2462' MD T/ SURFACE. MONITOR DISP. VIA TT. L/D BAKER CUTTER 2,462.0 0.0 10/21/2022 16:15 10/21/2022 16:30 0.25 SLOT, CSGRCY CLEN P CLEAN AND CLEAR RIG FLOOR P/U BAKER SPEAR AND PACKOFF ASS. TO RIG FLOOR 0.0 0.0 10/21/2022 16:30 10/21/2022 17:30 1.00 SLOT, CSGRCY BHAH P REPLACE BAKER GRAPPLE AND M/U BAKER BHA AS PER BAKER REP F/ SURFACE T/ 520' MD 67K S/O 0.0 520.0 10/21/2022 17:30 10/21/2022 18:00 0.50 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 520' MD T/ 1102' MD S/O 79K, MONITOR DISP VIA TT. 520.0 1,102.0 10/21/2022 18:00 10/21/2022 18:45 0.75 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 1,102' MD T/ 2,316' MD. S/O WT= 93K, MONITOR DISP VIA TT. 1,102.0 2,316.0 10/21/2022 18:45 10/21/2022 19:45 1.00 SLOT, CSGRCY CIRC P @ 2,316 CIRC B/U @ 6 BPM, 127 PSI, 33% F/O. TOTAL STKS PUMPED= 2,000 (201 BBLS). SIMOPS- C/O MCWS BATTERY, CHECK TORQUES ON TOP DRIVE SHOCK PIN 2,316.0 2,316.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 36/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/21/2022 19:45 10/21/2022 20:00 0.25 SLOT, CSGRCY TRIP P RIH F/ 2,316' MD T/ 2,370' MD. P/U WT=89K, S/O WT= 93K. SET DOWN 10K ON TOP OF FISH. P/U AND OBSERVE BREAK OVER @ 103K 2,316.0 2,370.0 10/21/2022 20:00 10/21/2022 20:30 0.50 SLOT, CSGRCY TRIP P POOH F/ 2,370' MD T/ 2,226' MD. P/U WT= 93K-103K. KEEPING 200 PSI ON STRING, CANNOT ESTABLISH CIRCULATION. OBSERVE SWABBING WHILE POOH. @ 2,267' MD OBSERVE CIRCULATION @ 1BPM, 14 PSI, 14-21% F/O. 2,370.0 2,226.0 10/21/2022 20:30 10/21/2022 22:00 1.50 SLOT, CSGRCY CIRC P @ 2,226' MD CIRC B/U X2 @ 6 BPM, 122 PSI, 36%. TOTAL STKS PUMPED= 5,404 (544 BBLS) 2,226.0 2,226.0 10/21/2022 22:00 10/21/2022 22:45 0.75 SLOT, CSGRCY OWFF P OWFF F/ 30 MIN, B/D TOP DRIVE 2,226.0 2,226.0 10/21/2022 22:45 10/22/2022 00:00 1.25 SLOT, CSGRCY TRIP P POOH W/ 4" DP F/ 2,226' MD T/ 520' MD, P/U WT= 61K. MONITORING HOLE FILL VIA TRIP TANK 2,226.0 520.0 10/22/2022 00:00 10/22/2022 00:30 0.50 SLOT, CSGRCY RURD P BREAK OUT AND INSTALL 4" X 5" XO ON 4" TIW VALVE, C/O HANDLING EQUIP 520.0 520.0 10/22/2022 00:30 10/22/2022 01:30 1.00 SLOT, CSGRCY TRIP P POOH RACKING 5" HWDP BACK IN DERRICK FROM 520' TO SURFACE L/D JARS MONITORING WELL VIA HOLE FILL TT 520.0 0.0 10/22/2022 01:30 10/22/2022 02:30 1.00 SLOT, CSGRCY CLEN P CLEAN AND CLEAR TOOLS FROM RIG FLOOR 0.0 0.0 10/22/2022 02:30 10/22/2022 03:45 1.25 SLOT, CSGRCY OTHR P L/D 7" CASING FISH TO PIPE SHED 126' RECOVERED FISH 0.0 0.0 10/22/2022 03:45 10/22/2022 04:15 0.50 SLOT, CSGRCY BHAH P P/U JT 7" CASING REMOVE DISENGAGE /REMOVE GRAPPLE 0.0 0.0 10/22/2022 04:15 10/22/2022 07:15 3.00 SLOT, CSGRCY TRIP P P/U 8 3/4" BIT CLEAN OUT ASSY TIH TO 2376' 0.0 2,376.0 10/22/2022 07:15 10/22/2022 08:30 1.25 SLOT, CSGRCY TRIP P 6K TAG UP @ 2376' MD. WASH AND REAM F/ 2376' MD T/ 2488' MD. 200 GPM, 234 PSI, 34% F/O, 30 RPM, 1K TQ. ROT = 73K CEMENT CUTTINGS NOTICED OVER SHAKERS 2,376.0 2,488.0 10/22/2022 08:30 10/22/2022 09:30 1.00 SLOT, CSGRCY REAM P REAM F/ 2488' T/ 2366' MD. 200- 600 GPM, 1556 PSI, 53% F/O, 60 RPM, 1K TQ 2,488.0 2,366.0 10/22/2022 09:30 10/22/2022 10:00 0.50 SLOT, CSGRCY CIRC P CBU @ 2366' MD @ 500 GPM, 1100 PSI, 50% F/O, 0 RPM. 2150 STKS PUMPED. SIMOPS BRING CSG EQUIPMENT TO RIG FLOOR. 2,366.0 2,366.0 10/22/2022 10:00 10/22/2022 10:15 0.25 SLOT, CSGRCY OWFF P B/D TD, OWFF 15 MIN 2,366.0 2,366.0 10/22/2022 10:15 10/22/2022 10:30 0.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2366' MD T/ 2271' MD. 9K OVER PULL OBSERVED. DECISION WAS MADE TO CIRCULATE 2,366.0 2,271.0 10/22/2022 10:30 10/22/2022 11:30 1.00 SLOT, CSGRCY TRIP P CIRCULATE @ 650 GPM, 1640 PSI, 56 % F/O, 20 RPM, 1K TQ, 3189 STKS PUMPED 2,271.0 2,271.0 10/22/2022 11:30 10/22/2022 12:00 0.50 SLOT, CSGRCY TRIP P CONT. POOH ON ELEVATORS F/ 2271' MD T/ 1320' MD MONITOR DISP. VIA TT. 2,271.0 1,320.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 37/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/22/2022 12:00 10/22/2022 13:00 1.00 SLOT, CSGRCY TRIP P CONT. POOH ON ELEVATORS F/ 1320' MD T/ SURFACE' MD MONITOR DISP. VIA TT. 1,320.0 0.0 10/22/2022 13:00 10/22/2022 13:15 0.25 SLOT, CSGRCY RURD P RIG UP DDI CSG. M/U TIW XO 0.0 0.0 10/22/2022 13:15 10/22/2022 14:45 1.50 SLOT, CSGRCY TRIP P RIH 10 STD'S OF 3.5" TUBING F/ SURFACE T/ 927' MD USING DDI POWER TONGS 0.0 927.0 10/22/2022 14:45 10/22/2022 16:00 1.25 SLOT, CSGRCY TRIP P CONT. RIH ON 4" DP F/ 927' MD T/ 2490' TAG UP. S/O 75K MONITOR DISP. VIA TT. 927.0 2,490.0 10/22/2022 16:00 10/22/2022 16:45 0.75 SLOT, CSGRCY REAM P WASH AND REAM F/ 2490' MD T/ 2625' MD. 6 BPM, 138 PSI, 10 RPM, 1K TQ, 30% F/O. 2,490.0 2,625.0 10/22/2022 16:45 10/22/2022 17:00 0.25 SLOT, CSGRCY TRIP P PUMP 16PPG. SPACER @ 3 BPM, 17 PSI, 30 % F/O 337 STKS PUMPED 2,625.0 2,625.0 10/22/2022 17:00 10/22/2022 17:15 0.25 SLOT, CSGRCY TRIP P POOH ON ELEVATORS F/ 2625' MD T/ 2435' MD. P/U 72K. SIMOPS BLOW AIR TO CEMENTERS 2,625.0 2,435.0 10/22/2022 17:15 10/22/2022 18:00 0.75 SLOT, CSGRCY TRIP P B/D TD. P/U WORKING SINGLE, 15' PUP JT AND BAKER CEMENT SWIVEL AND SPACE OUT FOR CEMENT JOB @ 2,488' MD 2,435.0 2,488.0 10/22/2022 18:00 10/22/2022 19:15 1.25 SLOT, CSGRCY CLEN P FINISH PREP IN PITS FOR CEMENT JOB, HOLD PJSM FOR PUMPING CEMENT 2,488.0 2,488.0 10/22/2022 19:15 10/22/2022 20:15 1.00 SLOT, CEMENT CMNT P SLB PUMPS 2 BBLS H20, TEST SURFACE LINES T/ 500/2000 PSI (TEST GOOD). SLB PUMPS 34.6 BBLS 13.5# MUD PUSH II, SHUT DOWN AND DROP WIPER BALL. SLB PUMPS 32.5 BBLS 17# CEMENT, 5.4 BBLS 13.5# MUD PUSH II, SLB DISPLACE 13 BBLS 9.8# BRINE. ROTATE 20 RPM, 1K TQ DURING CEMENT JOB 2,488.0 2,488.0 10/22/2022 20:15 10/22/2022 20:30 0.25 SLOT, WELLPR TRIP P R/D CEMENT HOSE. L/D CEMENT SWIVEL, 14' PUP, AND 2 SINGLES F/ 2,488' MD T/ 2,412' MD. P/U WT= 70K 2,488.0 2,412.0 10/22/2022 20:30 10/22/2022 21:15 0.75 SLOT, WELLPR TRIP P POOH ON ELEVATORS W/ 4" DP F/ 2,412' MD T/ 2,054' MD @ 12 FT/MIN, MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 65K 2,412.0 2,054.0 10/22/2022 21:15 10/22/2022 22:15 1.00 SLOT, WELLPR CIRC P @ 2,054' MD DROP WIPER BALL, PUMP 10 BBLS FRESH WATER CHASED W/ 9.8# BRINE. CIRC X2 B/U @ 8 BPM, 189 PSI, 43% F/O, 30 RPM, 1K TQ. TOTAL STKS PUMPED= 3,124 (314 BBLS) 2,054.0 2,054.0 10/22/2022 22:15 10/22/2022 22:45 0.50 SLOT, WELLPR OWFF P OWFF (STATIC), B/D TOP DRIVE 2,054.0 2,054.0 10/22/2022 22:45 10/22/2022 23:30 0.75 SLOT, WELLPR TRIP P POOH ON ELEVATORS W/ 4" DP F/ 2,054' MD T/ 927' MD, MONITORING HOLE FILL VIA TRIP TANK. P/U WT= 51K 2,054.0 927.0 10/22/2022 23:30 10/22/2022 23:45 0.25 SLOT, WELLPR RURD P C/O HANDLING EQUIPMENT FOR 3 1/2" TBG, R/U TO L/D 3 1/2" TBG 927.0 927.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 38/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/22/2022 23:45 10/23/2022 00:00 0.25 SLOT, WELLPR TRIP P L/D 3 1/2" HYD 563 TBG F/ 927' MD T/ 710' MD, P/U WT= 48K. MONITORING HOLE FILL VIA TRIP TANK 927.0 0.0 10/23/2022 00:00 10/23/2022 00:45 0.75 SLOT, WELLPR WOC P CONT. T/ L/D 3 1/2" HYD 563 TBG F/ 710' MD T/ SURFACE, P/U WT= 45K. MONITORING HOLE FILL VIA TRIP TANK 710.0 0.0 10/23/2022 00:45 10/23/2022 02:30 1.75 SLOT, WELLPR WOC P R/D 3 1/2" TBG HANDLING EQUIPMENT, CLEAN AND CLEAR RIG FLOOR, CLEAN OUT CEMENT VALVES 0.0 0.0 10/23/2022 02:30 10/23/2022 06:00 3.50 SLOT, WELLPR WOC P CLEAN OUT PITS IN ROCKWASHER, SERVICE TOP DRIVE AND BLOCKS, HOUSEKEEPING AROUND THE RIG, PERFORM MP2'S 0.0 0.0 10/23/2022 06:00 10/23/2022 12:00 6.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. WORK ON MP2'S. SHUT IN BLINDS AND PERFORM KOOMEY MONTHLY MP2. MP2 ON CENTRIFUGE. BLOW DOWN TIGER TANK AND PREP FOR REMOVAL. GATHER BAKER TOOLS AND PREP FOR SHIPPING 0.0 0.0 10/23/2022 12:00 10/23/2022 18:00 6.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. CONT. WITH MP2'S AND HOUSEKEEPING. PREP FOR UPCOMING WELL HEAD SWAP. HOUSEKEEPING AROUND RIG. INSTALL WATER PUMP IN PUMP MOD 0.0 0.0 10/23/2022 18:00 10/23/2022 22:00 4.00 SLOT, WELLPR WOC P CONT. WAITING ON CEMENT. CONT. WITH MP2'S AND HOUSEKEEPING. PREP FOR UPCOMING WELL HEAD SWAP. HOUSEKEEPING AROUND RIG. BREAK DOWN CEMENT SWIVEL. PREP FOR CLEAN OUT BHA 0.0 0.0 10/23/2022 22:00 10/23/2022 22:30 0.50 SLOT, WELLPR BHAH P M/U CLEAN OUT BHA, RIH W/ 5" HWDP F/ SURFACE T/ 479' MD, S/O WT= 64K. MONITORING DISPLACEMENT VIA TRIP TANK 0.0 479.0 10/23/2022 22:30 10/23/2022 22:45 0.25 SLOT, WELLPR RURD P C/O HANDLING EQUIPMENT T/ 4" 479.0 479.0 10/23/2022 22:45 10/23/2022 23:30 0.75 SLOT, WELLPR TRIP P RIH W/ 4" DP F/ 479' MD T/ 1,992' MD, S/O WT= 83K, P/U WT= 79K. MONITORING DISPLACEMENT VIA TRIP TANK. 479.0 992.0 10/23/2022 23:30 10/24/2022 00:00 0.50 SLOT, WELLPR WASH P WASH DOWN F/ 1,992' MD T/ 2,176' MD @ 3 BPM, 76 PSI, 29% F/O, S/O WT= 83K. NEVER TAGGED CEMENT GREEN CEMENT COMING OVER SHAKERS, MUD ENGINEER CAUGHT SAMPLES 992.0 2,176.0 10/24/2022 00:00 10/24/2022 00:30 0.50 SLOT, WELLPR CIRC P @ 2176' CIRCULATE 2 B/U @ 420 GPM 750 PSI 47% F/O STROKES PUMPED 2893 NO HARD CEMENT ONLY GREEN MUCKY CEMENT. 2,176.0 2,176.0 10/24/2022 00:30 10/24/2022 00:45 0.25 SLOT, WELLPR TRIP P POOH FROM 2176' TO 2083' RACKING 1 STAND BACK P/U 79K 2,176.0 2,083.0 10/24/2022 00:45 10/24/2022 01:00 0.25 SLOT, WELLPR OTHR P BLOW DOWN TOP DRIVE 2,083.0 2,083.0 10/24/2022 01:00 10/24/2022 05:00 4.00 SLOT, WELLPR WOC P WAITING ON CEMENT MONITOR WELL VIA TRIP TANK 2,083.0 2,083.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 39/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/24/2022 05:00 10/24/2022 05:30 0.50 SLOT, WELLPR WASH P TIH ONE STAND MAKE CONNECTION WASH F/ 2176' TO 2226' WASHED WITH NO WEIGHT 2,083.0 2,226.0 10/24/2022 05:30 10/24/2022 06:00 0.50 SLOT, WELLPR CIRC P CIRCUALTE 2 B/U CIRCULATE @ 650 GPM, 1709 PSI, 30 RPM, 1K TQ, 53% F/O. RICP. F/ 2176' MD T/ 2156' MD, 3948 STKS PUMPED 2,176.0 2,176.0 10/24/2022 06:00 10/24/2022 06:30 0.50 SLOT, WELLPR OWFF P B/D TD OWFF F/ 15 MIN. 2,176.0 2,176.0 10/24/2022 06:30 10/24/2022 09:30 3.00 SLOT, WELLPR TRIP P POOH ON ELEVATORS F/ 2176' MD T/ SURFACE. MONITOR DISP. VIA TT 2,176.0 0.0 10/24/2022 09:30 10/24/2022 11:45 2.25 SLOT, WELLPR TRIP P M/U BAKER SCRAPER AND 8-3/4" BIT AND RIH F/ SURFACE T/ 2092' MD MONITOR DISP. VIA TT. 0.0 2,092.0 10/24/2022 11:45 10/24/2022 12:00 0.25 SLOT, WELLPR REAM P SCRAPE AND POLISH CSG F/ 2092' T/ 2180' @ 650 GPM, 1667 PSI, 30 PRM, 1K TQ, 73K S/O, 72K P/U, 71K ROT 2,092.0 2,180.0 10/24/2022 12:00 10/24/2022 12:15 0.25 SLOT, WELLPR REAM P CONT. SCRAPE AND POLISH CSG F/ 2092' T/ 2180' @ 650 GPM, 1667 PSI, 30 PRM, 1K TQ 4321 STKS PUMPED 73K S/O, 72K P/U, 71K ROT 2,092.0 2,180.0 10/24/2022 12:15 10/24/2022 12:30 0.25 SLOT, WELLPR OWFF P B/D TD OWFF 2,180.0 2,180.0 10/24/2022 12:30 10/24/2022 14:45 2.25 SLOT, WELLPR TRIP P POOH ON ELEVATORS F/ 2180' MD T/ SURFACE. MONITOR DISP VIA TT. P/U 72K 2,180.0 0.0 10/24/2022 14:45 10/24/2022 15:00 0.25 SLOT, WELLPR BHAH P M/U BAKER TEST PACKER AS PER BAKER REP. F/ SURFACE T/ 27' MD. 0.0 27.0 10/24/2022 15:00 10/24/2022 17:00 2.00 SLOT, WELLPR TRIP P RIH W/ 4" DP. F/ 27' MD T/ 2178' MD. FILLING ON THE FLY WITH FILL UP HOSE. MONITOR DISP. VIA PIT 5. 72K P/U, 75K S/O 27.0 2,178.0 10/24/2022 17:00 10/24/2022 18:00 1.00 SLOT, WELLPR OTHR P SPACE OUT AND SET BAKER TEST PACKER AS PER BAKER REP @ 2178' MD. STAGE PRESSURE UP 500 PSI IN 15 MIN INTERVALS 2,178.0 2,178.0 10/24/2022 18:00 10/24/2022 18:15 0.25 SLOT, WELLPR PRTS P TEST PACKER T/ 2,000 PSI F/ 5 MIN UNCHARTED, TEST GOOD CONFIRM PACKER SET 2,178.0 2,178.0 10/24/2022 18:15 10/24/2022 18:30 0.25 SLOT, WELLPR OTHR P RELEASE F/ PACKER PER BACKER HUGHES REP, POOH F/ 2,178' MD T/ 2,168' MD, P/U WT= 72K 2,178.0 2,168.0 10/24/2022 18:30 10/24/2022 19:15 0.75 SLOT, WELLPR CIRC P DISPLACE WELL F/ 9.8# BRINE T/ 9.8# LSND @ 500 GPM, 270 PSI, 51% F/O, 20 RPM, 1K TQ. TOTAL STKS= 3,740 (376 BBLS) 2,168.0 2,168.0 10/24/2022 19:15 10/24/2022 20:00 0.75 SLOT, WELLPR TRIP P POOH F/ 2,168' MD T/ 2,108' MD, P/U WT= 71K. RACK BACK STD. R/U T/ TEST PACKER/CSG 2,168.0 2,108.0 10/24/2022 20:00 10/24/2022 20:45 0.75 SLOT, WELLPR PRTS P TEST PACKER/CSG T/ 2,000 PSI F/ 30 MIN CHARTED. WITNESSED BY EPA REP BRIAN GOSS. PRESSURE UP TO 2,233 PSI, AFTER 30 MIN PRESSURE @ 2,228 PSI. 1.7 BBLS TO PRESSURE UP, 1.7 BBLS BLED BACK TO TRIP TANK. 2,108.0 2,108.0 10/24/2022 20:45 10/24/2022 21:00 0.25 SLOT, WELLPR RURD P R/D TESTING EQUIPMENT, B/D KILL LINE 2,108.0 2,108.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 40/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/24/2022 21:00 10/24/2022 22:00 1.00 SLOT, WELLPR TRIP P POOH RACKING BACK 4" DP F/ 2,108' MD T/ SURFACE, MONITORING HOLE FILL VIA TRIP TANK 2,108.0 0.0 10/24/2022 22:00 10/24/2022 22:15 0.25 SLOT, WELLPR BHAH P SWAP COMPONENT ON BAKER HUGHES PACKER RUNNING TOOL PER BAKER HUGHES REP. L/D PACKER RUNNING TOOL 0.0 0.0 10/24/2022 22:15 10/24/2022 22:30 0.25 SLOT, WELLPR OTHR P PULL WEAR RING PER FMC REP 0.0 0.0 10/24/2022 22:30 10/24/2022 23:00 0.50 SLOT, WELLPR WWWH P WASH BOP STACK 0.0 0.0 10/24/2022 23:00 10/24/2022 23:30 0.50 SLOT, WELLPR OWFF P OWFF (STATIC) 0.0 0.0 10/24/2022 23:30 10/25/2022 00:00 0.50 SLOT, WELLPR NUND P VERIFIED 2 BARRIERS: TESTED BAKER PACKER 2000 PSI TEST 9 5/8" CASING 2000 PSI F/ 30 MIN ON CHART WITNESS BY EPA REP RYAN GOSS TEST FLUID 9.8 PPG LSND. WP PRIOR TO N/D BOPE 0.0 0.0 10/25/2022 00:00 10/25/2022 02:00 2.00 SLOT, WELLPR NUND P CONT. NIPPLE DOWN BOPE AND RISERS 0.0 0.0 10/25/2022 02:00 10/25/2022 06:00 4.00 SLOT, WELLPR NUND P NIPPLE DOWN AND PULL FMC WELL HEAD TO GEN 5 AS PER FMC REP.SIMOPS CHANGE OUT UPPER RAMS TO 3.5" X 6" VBR'S 0.0 0.0 10/25/2022 06:00 10/25/2022 08:30 2.50 SLOT, WELLPR NUND P P/U AND INSTALL FMC GEN 5 WELL HEAD AS PER FMC REP. ALIGNMENT WITNESSED BY CPAI PRODUCTION PAD OPERATOR. 0.0 0.0 10/25/2022 08:30 10/25/2022 12:00 3.50 SLOT, WELLPR NUND P INSTALL 11X13" ADAPTER FLANGES AND INSTALL SPACER SPOOLS, GATHER RKB'S AND NIPPLE UP BOP'S 0.0 0.0 10/25/2022 12:00 10/25/2022 15:30 3.50 SLOT, WELLPR NUND P CONT. NIPPLE UP BOP'S INSTALL MPD RCD HEAD, AIR VALVE AND ALL 1502 HOSES AND CONNECTIONS. HOOK UP CHOKE AND KILL LINES. SIMOPS CHANGE OUT SAVER SUB TO NC-50. 0.0 0.0 10/25/2022 15:30 10/25/2022 17:00 1.50 SLOT, WELLPR RURD P CONT C/O SAVER SUB F/ XT-39 T/ NC -50. SIMOPS C/O ST-100 DIES. 0.0 0.0 10/25/2022 17:00 10/25/2022 17:30 0.50 SLOT, WELLPR PRTS P PRESSURE TEST MPD T/ 250/1250 PSI F/ 5 MIN. CHARTED. SIMOPS TEST GAS ALARMS 0.0 0.0 10/25/2022 17:30 10/25/2022 18:00 0.50 SLOT, WELLPR PRTS P PRESSURE TEST WELL HEAD AND WELL HEAD VALVES TO 2000 PSI CHARTED. 5 MIN 0.0 0.0 10/25/2022 18:00 10/25/2022 20:15 2.25 SLOT, WELLPR NUND P REMOVE MPD TEST CAP, INSTALL MPD RISER. SIMOPS- PUMP OUT BOP STACK 0.0 0.0 10/25/2022 20:15 10/25/2022 20:30 0.25 SLOT, WHDBOP BOPE P INSTALL TEST PLUG PER FMC REP 0.0 0.0 10/25/2022 20:30 10/25/2022 21:45 1.25 SLOT, WHDBOP BOPE P R/U TO TEST BOPE 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 41/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/25/2022 21:45 10/26/2022 00:00 2.25 SLOT, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 5,000 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI AND ANNULAR PREVENTER T/ 3,500 PSI FOR 5 CHARTED MIN, W/ 7" TEST JT TEST ANNULAR, 4 1/2" X 7" UPR, W/ 5" TEST JT TEST 4 1/2" X 7" UPR & 3 1/2" X 6" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 5" FOSV X2, 5" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS 0.0 0.0 10/26/2022 00:00 10/26/2022 02:00 2.00 SLOT, WHDBOP BOPE P CONT. TO TEST BOPE ALL TESTS T/ 250 LOW 5,000 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI AND ANNULAR PREVENTER T/ 3,500 PSI FOR 5 CHARTED MIN, W/ 7" TEST JT TEST ANNULAR, 4 1/2" X 7" UPR, W/ 5" TEST JT TEST ANNULAR, 4 1/2" X 7" UPR & 3 1/2" X 6" LPR, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 5" FOSV X2, 5" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3100 PSI. MANIF. = 1500 PSI. ACC = 1800 PSI AFTER ALL FUNCTIONS ON BOTTLES, 8 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 67 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 15 SEC. UPR = 6 SEC. BLIND / SHEARS = 6 SEC. LPR = 6 SEC. CHOKE HCR = 1 SEC. KILL HCR = 1 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP SEAN SULLIVAN WAIVED WITNESS @ 0750 HRS on 10/24/22 0.0 0.0 10/26/2022 02:00 10/26/2022 04:45 2.75 SLOT, WELLPR RURD P R/D TESTING EQUIPMENT. SIMOPS- PULL TEST PLUG AND SET WEAR RING. WEAR RING ID= 9 7/8", WEAR RING LENGTH= 38" CLEAN AND CLEAR RIG FLOOR 0.0 0.0 10/26/2022 04:45 10/26/2022 05:30 0.75 SLOT, WELLPR BHAH P P/U BAKER RETRIEVAL TOOL AS PER BAKER REP. 0.0 20.0 10/26/2022 05:30 10/26/2022 07:45 2.25 SLOT, WELLPR TRIP P RIH W/ 5" DP F/ SURFACE T/ 2150' MD, S/O WT= 96K, S/O WT= 93K. MONITORING DISPLACEMENT VIA TRIP TANK 20.0 2,150.0 10/26/2022 07:45 10/26/2022 08:15 0.50 SLOT, WELLPR CIRC P DISP. WELL TO 9.8 PPG BRINE. 320 GPM, 168 PSI, 20 RPM, 1K TQ, 43%,1702 STKS 2,150.0 2,150.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 42/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/26/2022 08:15 10/26/2022 08:45 0.50 SLOT, WELLPR TRIP P RIH F/ 2150' MD T/ 2166' MD. RETRIEVE TEST PACKER AS PER BAKER REP. 94K P/U, 97K S/O, 95K ROT. 2,150.0 2,166.0 10/26/2022 08:45 10/26/2022 12:00 3.25 SLOT, WELLPR TRIP P POOH ON ELEVATOR F/ 2166' MD T/ 321' MD. P/U 54K MONITOR DISP. VIA TT. 2,166.0 321.0 10/26/2022 12:00 10/26/2022 12:45 0.75 SLOT, WELLPR TRIP P POOH ON ELEVATOR F/ 321' MD T/ SURFACE. MONITOR DISP. VIA TT. L/D BAKER TEST PACKER AS PER BAKER REP 321.0 0.0 10/26/2022 12:45 10/26/2022 13:45 1.00 SLOT, WELLPR TRIP P L/D BAKER TOOLS, CLEAN AND CLEAR RIG FLOOR. P/U SLB TOOLS TO RIG FLOOR. 0.0 0.0 10/26/2022 13:45 10/26/2022 15:45 2.00 SLOT, WELLPR TRIP P P/U AND M/U SLB BHA AS PER SLB DD. F/ SURFACE T/ 693' MD. S/O 78K. MONITOR DISP. VIA TT. 0.0 693.0 10/26/2022 15:45 10/26/2022 17:30 1.75 SLOT, WELLPR TRIP P CONT. RIH F/ 693' MD T/ 2200' MD S/O 98K, MONITOR DISP. VIA TT. 693.0 2,200.0 10/26/2022 17:30 10/26/2022 18:00 0.50 SLOT, WELLPR CIRC P FILL PIPE TEST GYRO AND MWD @ 400 GPM, 728 PSI, 44 % F/O. 2,200.0 2,200.0 10/26/2022 18:00 10/26/2022 18:15 0.25 SLOT, WELLPR COCF P WASH F/ 2200' T/ 2229' MD. 3 BPM, 215 PSI, 28% F/O. TAG CEMENT @ 2229' MD. 2,200.0 2,229.0 10/26/2022 18:15 10/26/2022 20:15 2.00 SLOT, WELLPR COCF P DRILL CEMENT F/ 2229' MD T/ 2366' MD @ 400 GPM, 820 PSI, 40 RPM, 3K TQ, 4-7K WOB, 45% F/O. 2,229.0 2,366.0 10/26/2022 20:15 10/26/2022 21:30 1.25 SLOT, WELLPR CIRC P CBU @ 400 GPM, 780 PSI, 20 RPM, 1K, 45% F/O RICP. PIPE F/ 2366' MD T/ 2335' MD. 102K P/U 99K S/O (ROTATING 2,366.0 2,366.0 10/26/2022 21:30 10/26/2022 22:15 0.75 SLOT, WELLPR CIRC P ROT. AND RECIP F/ 2,365' MD T/ 2,336' MD, DISPLACE WELL F/ 9.8# BRINE TO 10# LSNDM @ 400 GPM, 692 PSI, 47% F/O, 20 RPM, 1K TQ. TOTAL STKS PUMPED= 3,920 (394 BBLS). 2,366.0 2,366.0 10/26/2022 22:15 10/26/2022 23:00 0.75 SLOT, WELLPR OTHR P CHANGE SCREENS ON SHAKERS 2,366.0 2,366.0 10/26/2022 23:00 10/27/2022 00:00 1.00 SLOT, WELLPR TRIP P RIH F/ 2,366' MD T/ 2,380' MD, S/O WT= 106K SLIDE F/ 2,380' MD T/ 2,390' MD @ 500 GPM, 997 PSI, 51% F/O, WOB= 5K 2,366.0 2,380.0 10/27/2022 00:00 10/27/2022 01:30 1.50 SLOT, WELLPR KOST P CONT. TO SLIDE F/ 2,390' MD T/ 2,438' MD DRILL 20' NEW FORMATION @ 450 GPM, 864 PSI, 51% F/O, WOB= 5- 18K 2,390.0 2,438.0 10/27/2022 01:30 10/27/2022 03:00 1.50 SLOT, WELLPR KOST P WORK THROUGH SLIDE F/ 2,438' MD T/ 2,360' W/ PUMPS ON X2 @ 450 GPM, 778 PSI, 51% F/O, S/O WT= 113K, P/U WT=103K. ROTATE THROUGH SLIDE UP AND DOWN X2 F/ 2,410' MD TO 2,438' MD @ 40 RPM, 1-4K TQ. WORK THROUGH SLIDE X1 W/ PUMPS OFF, S/O WT=114, P/U WT=106K. NO ISSUES GOING DOWN OR UP THROUGH SLIDE AND SHOE. 2,380.0 2,360.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 43/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/27/2022 03:00 10/27/2022 03:30 0.50 SLOT, WELLPR CIRC P ROT AND RECIP F/ 2,360' MD T/ 2,263' MD @ 500 GPM, 941 PSI, 50% F/O, 40 RPM, 1K TQ. VERIFY MUD WEIGHTS EVEN IN AND OUT. TOTAL STKS PUMPED= 2881STK 290 BBLS) 2,360.0 2,263.0 10/27/2022 03:30 10/27/2022 04:00 0.50 SLOT, WELLPR RURD P B/D TOP DRIVE, R/U FOR LOT/FIT 2,263.0 2,263.0 10/27/2022 04:00 10/27/2022 04:45 0.75 SLOT, WELLPR FIT P PERFORM LOT TO 15 PPG EMW (627 PSI) 2,263.0 2,263.0 10/27/2022 04:45 10/27/2022 05:15 0.50 SLOT, WELLPR RURD P R/D TESTIING EQUIPMENT, B/D KILL LINE 2,263.0 2,263.0 10/27/2022 05:15 10/27/2022 05:30 0.25 SLOT, WELLPR SRVY P RIH TO SHOE TAKE SURVEY 2,376.0 2,376.0 10/27/2022 05:30 10/27/2022 12:00 6.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 2,438‘ MD - T/ 2863‘ MD 2849‘ TVD, WOB = 19, GPM 500=, PSI ON = 1360, PSI OFF =, RPM =40, TQ ON = 1.9K, FLOW OUT = 50%, ECD = PPG, P/U WT = 131K, S/O WT =121K, RT WT = 115K, AST = 1.14, ART = 3.38, ADT = 4.52, TOTAL BIT HRS = 6.18, TOTAL JAR HRS = 6.18 2,438.0 2,863.0 10/27/2022 12:00 10/27/2022 13:30 1.50 INTRM1, DRILL SRVY P OBTAIN FINAL SURVEY, CIRCULATE B/U (1386 TOT. STRKS) OBTAIN SPR'S. 2,863.0 2,863.0 10/27/2022 13:30 10/27/2022 15:00 1.50 INTRM1, DRILL BKRM P BROOH F/ 2863‘ MD - T/ 2482‘ MD, W/ GPM = 500, PSI = 1080, RPM = 40, TQ = 2K. F/O = 48%, P/U WT = 131K, S/O WT = 121K, RT WT = 115K, RT P/U WT= 107K 2,863.0 2,482.0 10/27/2022 15:00 10/27/2022 16:00 1.00 INTRM1, DRILL CIRC P ROTATE & RECIP. F/ 2482' MD T/ 2392'MD, X3 TO CLEAN UP DOG LEG W/ 500 GPM, 40 RPM, 2K TQ, 50% F/O, 1018 PSI, P/U RT WT= 102K, S/O RT WT= 112K 2,482.0 2,392.0 10/27/2022 16:00 10/27/2022 16:30 0.50 INTRM1, DRILL CIRC P CIRC. B/U X2 WHILE BROOH F/ 2392' MD, T/ 2295' MD , @ 500 GPM, 40 RPM, 50% F/O, 1K TQ, 1000 PSI, P/U RT WT= 102K 2,392.0 2,295.0 10/27/2022 16:30 10/27/2022 17:00 0.50 INTRM1, DRILL OWFF P OWFF (STATIC) 2,295.0 2,295.0 10/27/2022 17:00 10/27/2022 19:15 2.25 INTRM1, DRILL TRIP P POOH F/ 2295‘ MD - T/ 707‘ MD, W/ 5” DP, RK BK IN DRK, P/U WT = 104K, S/O WT = 102K; MONITOR DISP. ON TRIP TANK 2,295.0 707.0 10/27/2022 19:15 10/27/2022 19:30 0.25 INTRM1, DRILL OWFF P OWFF (STATIC) 707.0 707.0 10/27/2022 19:30 10/27/2022 23:00 3.50 INTRM1, DRILL BHAH P RACK BK HWDP & JARS, L/D BHA PER SLB REP. 707.0 0.0 10/27/2022 23:00 10/28/2022 00:00 1.00 INTRM1, DRILL CLEN P CLEAN AND CLEAR FLOOR, BRING UP PIECES FOR NEXT BHA SPR’S @ 2860’ MD, 2846’ TVD MW = 9.9+ PPG TIME: 13:15 #1 MP – 30SPM – 220PSI 40SPM – 260PSI #2 MP – 30SPM – 180PSI 40SPM – 250PSI 0.0 0.0 10/28/2022 00:00 10/28/2022 01:00 1.00 INTRM1, DRILL CLEN P CONT. TO CLEAN AND CLEAR RIG FLOOR , BRING UP PIECE ON NEXT BHA 0.0 0.0 10/28/2022 01:00 10/28/2022 02:30 1.50 INTRM1, DRILL BHAH P HOLD PJSM P/U 8 3/4" INTERTM BHA AS PER SLB REP F/ SURACE TO 550 0.0 550.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 44/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/28/2022 02:30 10/28/2022 05:30 3.00 INTRM1, DRILL TRIP P TIH F/ 550' TO 2863' SHALLOW TEST DIRECTIONAL TOOLS 2050' 550.0 2,773.0 10/28/2022 05:30 10/28/2022 06:00 0.50 INTRM1, DRILL DDRL P FILL PIPE WASH LAST STAND DOWN TO 2683' 2,773.0 2,863.0 10/28/2022 06:00 10/28/2022 12:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 2862‘ MD - T/3355 ‘ MD 3320‘ TVD, WOB =4K, GPM =700, PSI ON =1760, PSI OFF =1733, RPM =150, TQ ON = 4K, FLOW OUT =55 %, ECD =11.98 PPG, P/U WT =123K, S/O WT = 124K, RT WT = 119K, ADT =3.96, TOTAL BIT HRS =3.96, TOTAL JAR HRS =10.14, SPR’S @ 2900’ MD, 2886’ TVD MW = 10.0 PPG TIME: 06:45 #1 MP – 30SPM – 150 PSI 40SPM – 170 PSI #2 MP – 30SPM –125 PSI 40SPM – 160 PSI 2,863.0 3,355.0 10/28/2022 12:00 10/28/2022 18:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 3355‘ MD - T/ 3658‘ MD 3593' TVD, WOB =4K, GPM =700, PSI ON =1779, PSI OFF =1784, RPM =, TQ ON = 3K, FLOW OUT = 57%, ECD =11.85 PPG, P/U WT = 130K, S/O WT = 131K, RT WT = 126K, ADT =4.94, TOTAL BIT HRS =8.90, TOTAL JAR HRS =15.08, 3,355.0 3,658.0 10/28/2022 18:00 10/29/2022 00:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 3,658‘ MD - T/ 4,038‘ MD 3,911‘ TVD, WOB =5, GPM =700, PSI ON =1,836, PSI OFF =1,850, RPM =120, TQ ON = 3K, FLOW OUT = 55%, ECD = 11.8PPG, P/U WT = 133K, S/O WT = 135K, RT WT = 133K, ADT =3.81, TOTAL BIT HRS =12.71, TOTAL JAR HRS =18.89 SPR’S @ 3,754’ MD, 3,676’ TVD MW = 10.0PPG TIME: 19:15 #1 MP – 30SPM – 200PSI 40SPM – 260PSI #2 MP – 30SPM – 200PSI 40SPM – 260PSI 3,658.0 4,038.0 10/29/2022 00:00 10/29/2022 06:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 4,038‘ MD TO 4512 3,911‘ TVD, WOB =5, GPM =700, PSI ON =1,836, PSI OFF =1,850, RPM =120, TQ ON = 3K, FLOW OUT = 55%, ECD = 11.8PPG, P/U WT = 133K, S/O WT = 135K, RT WT = 133K, ADT =3.81, TOTAL BIT HRS =12.71, TOTAL JAR HRS =18.89 4,038.0 4,512.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 45/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/29/2022 06:00 10/29/2022 12:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 4512‘ MD - T/ 5089‘ MD 4745‘ TVD, WOB =11, GPM =700, PSI ON =2044, PSI OFF =2001, RPM =80, TQ ON = 2-8K, FLOW OUT = 55%, ECD =11.94 PPG, P/U WT = 155K, S/O WT = 147K, RT WT = 145K, ADT =4.81, TOTAL BIT HRS =22.03, TOTAL JAR HRS =28.21, SPR’S @ 4601’ MD, 4358’ TVD MW = 10.0 PPG TIME: 06:45 #1 MP – 30SPM – 180 PSI 40SPM – 230 PSI #2 MP – 30SPM – 170 PSI 40SPM – 220 PSI 4,512.0 5,089.0 10/29/2022 12:00 10/29/2022 18:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 5089‘ MD - T/ 5,644‘ MD 5,181‘ TVD, WOB =11K, GPM =700, PSI ON =2208, PSI OFF =2123, RPM =120, TQ ON = 3-10K, FLOW OUT = 57%, ECD = 12.06 PPG, P/U WT = 116K, S/O WT = 153K, RT WT = 153K, ADT =4.61, TOTAL BIT HRS =26.64, TOTAL JAR HRS =32.82 5,089.0 5,644.0 10/29/2022 18:00 10/30/2022 00:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 5,644‘ MD - T/ 6,304‘ MD 5,699‘ TVD, WOB =14K, GPM =700, PSI ON =2,174, PSI OFF =2,152, RPM =120, TQ ON = 8K, FLOW OUT = 55%, ECD = 11.79PPG, P/U WT = 177K, S/O WT = 160K, RT WT = 155K, ADT =4.61, TOTAL BIT HRS =31.25, TOTAL JAR HRS =37.43 SPR’S @ 5,738’ MD, 5,253’ TVD MW = 10.0 PPG TIME: 18:39 #1 MP – 30SPM – 300 PSI 40SPM - 350 PSI #2 MP – 30SPM – 290 PSI 40SPM - 340 PSI 5,644.0 6,304.0 10/30/2022 00:00 10/30/2022 06:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 6,304‘ MD T/ 6908' 6096‘ TVD, WOB =14K, GPM =700, PSI ON =2,174, PSI OFF =2,152, RPM =120, TQ ON = 8K, FLOW OUT = 55%, ECD = 11.79PPG, P/U WT = 177K, S/O WT = 160K, RT WT = 155K, ADT =4.61, TOTAL BIT HRS =31.25, TOTAL JAR HRS =37.43 @ 6770' DRILL INTO SAND STRINGER STARTED LOSINGH MUD @ 30/ 60 BPH, STARTED BUILDING LCM SWEEPS 45 PPB NUT PLUG / SAFE CARB 6,304.0 6,908.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 46/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/30/2022 06:00 10/30/2022 09:00 3.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 6908‘ MD - T/ 7059‘ MD 6293‘ TVD, WOB =15, GPM =550, PSI ON =1550, PSI OFF =1477, RPM =80, TQ ON = 8K, FLOW OUT = 51%, ECD = 11.39 PPG, P/U WT = 190K, S/O WT = 169K, RT WT = 174K, ADT =1.59, TOTAL BIT HRS =37.14, TOTAL JAR HRS =43.32 LOSES CONTINUED INCRESED TO 100 BPH MIXING AND PUMPING LCM SWEEPS LOSES DECREASE TO 30/ 60 BPH AVG. 6,900.0 7,058.0 10/30/2022 09:00 10/30/2022 09:30 0.50 INTRM1, DRILL MPDA P CIRC. B/U PRIOR TO INSTALLING MPD BEARING @ 7,058' MD, 450 GPM, 80 GPM, 1080 PSI, 49% F/O, 3550 TOTAL STROKES PUMPED 7,058.0 7,058.0 10/30/2022 09:30 10/30/2022 10:00 0.50 INTRM1, DRILL OWFF P OWFF, CLOSE ANNULAR & PERFORM DRAWDOWN TO CONFIRM BALLOONING, ICP 92 PSI, DRAWDOWN X3, STATIC, TOTAL RETURNS 3.6 BBLS, 7,058.0 7,058.0 10/30/2022 10:00 10/30/2022 12:00 2.00 INTRM1, DRILL CIRC P SPOT LCM PILL 3BPM, 218 PSI, 28% F/O, 1256 STRKS@ 7058' MD AND LET SOAK WHILE INSTALLING MPD BEARING SPR’S @ 6964’ MD, 6218’ TVD MW = 10+ PPG TIME: 06:30 #1 MP – 30SPM – 330 PSI 40SPM - 380 PSI #2 MP – 30SPM – 310 PSI 40SPM - 360 PSI 7,058.0 7,058.0 10/30/2022 12:00 10/30/2022 13:00 1.00 INTRM1, DRILL MPDA P FINISH INSTALLING MPD BEARING CHECK FLOW PATH THROUGH CHOKE 7,058.0 7,058.0 10/30/2022 13:00 10/30/2022 18:00 5.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 7059‘ MD - T/ 7390‘ MD 6553‘ TVD, WOB =14K, GPM =480, PSI ON =1460, PSI OFF 1425=, RPM =, TQ ON = 7K, FLOW OUT = 50%, ECD = 11.41 PPG, P/U WT = 204K, S/O WT = 172K, RT WT = 174K, ADT =3.72, TOTAL BIT HRS =40.86, TOTAL JAR HRS =47.04, 7,058.0 7,390.0 10/30/2022 18:00 10/30/2022 22:30 4.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 7,390‘ MD - T/ 7,644‘ MD 6,752‘ TVD, WOB =18K, GPM =480, PSI ON =1,522, PSI OFF =1,519, RPM =120, TQ ON = 8K, FLOW OUT = 51%, ECD = 11.51PPG, P/U WT = 215K, S/O WT = 177K, RT WT = 180K, ADT =3.66, TOTAL BIT HRS =44.52, TOTAL JAR HRS =50.70 7,390.0 7,644.0 10/30/2022 22:30 10/30/2022 22:45 0.25 INTRM1, DRILL TRIP P POOH F/ 7,644' MD T/ 7,628' MD @ 480 GPM, 1,387 PSI, 55% F/O, 80 RPM, 5K TQ. ROT P/U= 171K 7,644.0 7,628.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 47/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 10/30/2022 22:45 10/31/2022 00:00 1.25 INTRM1, DRILL CIRC P ROT AND RECIP F/ 7,628' MD T/ 7,534' MD @ 700 GPM, 2,493 PSI, 59% F/O, 60 RPM, 5K TQ. PUMP LCM PILL. TOTAL STKS PUMPED= 5,561 (559 BBLS) AVG. LOSS PER HR 39 BPH (TOUR LOSS 933 BBLS) SPR’S @ 7,436’ MD, 6,588’ TVD MW = 10.0PPG TIME: 18:35 #1 MP – 30SPM – 490/220PSI 40SPM – 560/230PSI #2 MP – 30SPM – 500/206PSI 40SPM – 600/197PSI 7,628.0 7,534.0 10/31/2022 00:00 10/31/2022 00:30 0.50 INTRM1, DRILL MPDA P LINE UP ON # 2 MUD PUMP ON INJECTION LINE TO BACKSIDE, CHECK UPS AND RUN PUMP ON BACKSIDE FOR MPD 7,534.0 7,534.0 10/31/2022 00:30 10/31/2022 07:00 6.50 INTRM1, DRILL BKRM P BROOH F/ 7534' TO 5926' 7,534.0 5,926.0 10/31/2022 07:00 10/31/2022 07:30 0.50 INTRM1, DRILL CIRC P CIRCULATE WHILE ROT/RECIP F/ 5926' MD T/ 6018' MD @ 400 GPM, 870 PSI, 90 RPM, 4K TQ, ROT P/U WT= 162K ROT S/O WT= 157K. 3380 TOTAL STRKS 5,926.0 6,018.0 10/31/2022 07:30 10/31/2022 09:00 1.50 INTRM1, DRILL STRP P BRING PUMP #2 ON T/ MPD F/ STRIP IN THE HOLE, STRIP IN THE HOLE F/ 6018' MD T/ 6900' MD. S/O WT= 160K 6,018.0 6,900.0 10/31/2022 09:00 10/31/2022 09:30 0.50 INTRM1, DRILL CIRC P @ 6900' MD SPOT 50 BBLS PROCORE LCM PILL @ 300 GPM, 525 PSI, 37% F/O, 1537 TOTAL STROKES. 6,900.0 6,900.0 10/31/2022 09:30 10/31/2022 11:00 1.50 INTRM1, DRILL STRP P BRING PUMP #2 ON INJ. LINE, STRIP OUT @ 1500' PER HR F/ 6900' MD T/ 5928' MD, MONITORING DISPLACEMENT VIA PITS 1-5, P/U WT= 189K. 6,900.0 5,928.0 10/31/2022 11:00 10/31/2022 12:00 1.00 INTRM1, DRILL SQEZ P PERFORM HESITATION SQUEEZE WHILE ROTATING @ 5 RPM, 50 PSI FOR 10 MIN., INCREASING IN 50 PSI INCREMENTS HOLDING PSI AND WATCHING BLEED OFF. 5,928.0 5,928.0 10/31/2022 12:00 11/1/2022 00:00 12.00 INTRM1, DRILL SQEZ P @ 5,928' MD CONT. T/ PERFORM HESITATION SQUEEZE WHILE ROTATING @ 5 RPM, 5K TQ, 50 PSI FOR 10 MIN, INCREASE PSI IN 50 POUND INCREMENTS HOLDING PSI AND SQUEEZING FOR 10 MIN. WORK PRESSURE UP T/ 200 PSI AND SQUEEZE 5 TIMES. CONTINUE INCREASING SQUEEZE PRESSURE UP TO 482 PSI IN 50 PSI INCREMENTS ALLOWING TO SQUEEZE FOR 30 MIN EACH INTERVAL. (OBSERVE SIGNS OF INJECTIVITY AT 480 PSI). CONTINUE TO SQUEEZE AT 460 PSI FOR 30 MIN EACH INTERVAL. 5,928.0 5,928.0 11/1/2022 00:00 11/1/2022 01:00 1.00 INTRM1, DRILL SQEZ P AT 5,928' MD, CONT. T/ PERFORM HESITATION SQUEEZE WHILE ROTATING @ 5 RPM, 5K TQ. PRESSURE UP TO 460 PSI @ 22:30 (10/31/22) AFTER 2.5 HRS WELLBORE PRESSURE= 116 PSI (10.4 PPG EWM) 5,928.0 5,928.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 48/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/1/2022 01:00 11/1/2022 04:00 3.00 INTRM1, DRILL CIRC P ROT AND RECIP F/ 5,928' MD T/ 5,835' MD STAGING FLOW RATE UP TO 700 GPM, 2,103 PSI, 62% F/O, 11.61 ECD, 80 RPM, 5K TQ, ROT P/U WT= 148K, ROT S/O WT= 163K. NO LOSSES OBSERVED WHILE CIRCULATING @ 700 GPM. PUMP LO VIS/HI VIS SWEEP TO FLUSH SLB TOOLS. TOTAL STKS PUMPED= 4356 ( 438 BBLS 5,928.0 5,835.0 11/1/2022 04:00 11/1/2022 04:30 0.50 INTRM1, DRILL CLEN P B/D TOP DRIVE, LINE UP MUD PUMP #2 5,928.0 5,928.0 11/1/2022 04:30 11/1/2022 06:30 2.00 INTRM1, DRILL STRP P STRIP ON ELEVATORS F/ 5,928' MD T/ 7,400' MD, S/O WT= 145, P/U WT= 155. MONITORING DISPLACEMENT VIA PIT#5 HOLDING 360 PSI IN SLIPS AND 200 PSI TRIPPING 5,928.0 7,400.0 11/1/2022 06:30 11/1/2022 08:30 2.00 INTRM1, DRILL CIRC P ROTATE/RECIP. F/ 7,400' MD T/ 7,437' MD 30 RPM, P/U RT WT= 178K S/O RT WT= 179K, WHILE STAGING PUMPS UP T/ 650 GPM, 30 RPM, 1730 PSI, 56% F/O. 7,400.0 7,437.0 11/1/2022 08:30 11/1/2022 10:00 1.50 INTRM1, DRILL WASH P WASH/REAM F/ 7,437' MD T/ 7,644' MD @ 80 RPM, 650 GPM, 2018 PSI, 60% F/O, 7K TQ, RT WT= 182K. 7,437.0 7,644.0 11/1/2022 10:00 11/1/2022 12:00 2.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 7,644‘ MD - T/ 7788‘ MD, 6865‘ TVD, WOB =15, GPM =600, PSI ON =1889, PSI OFF =1846, RPM =80, TQ ON = 7- 9K, FLOW OUT = 58%, ECD =11.56 PPG, P/U WT = 215K, S/O WT = 177K, RT WT = 180K. ADT =1.64, TOTAL BIT HRS =46.16, TOTAL JAR HRS =52.34, MPD CONNECTION BACK PSI = 400 7,644.0 7,788.0 11/1/2022 12:00 11/1/2022 17:30 5.50 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 7,788‘ MD - T/ 8,167‘ MD 7,167‘ TVD, WOB =14K, GPM=600, PSI ON =1882, PSI OFF =1870, RPM =80, TQ ON = 10K, FLOW OUT = 60%, ECD = 11.53 PPG, P/U WT = 218K, S/O WT = 170K, RT WT = 183K, ADT =4.39, TOTAL BIT HRS =50.55, TOTAL JAR HRS =56.73, MPD CONNECTION BACK PSI = 400 7,788.0 8,167.0 11/1/2022 17:30 11/1/2022 18:00 0.50 INTRM1, DRILL CIRC P ROTATE/RECIP. WHILE CIRCULATING B/U F/ 8,167' MD T/ 8,095' MD, @ 600 GPM, 80 RPM, 1920 PSI, 6K TQ, P/U RT WT= 185K, S/O RT WT= 188K. (6,386 TOTAL STROKES). 8,167.0 8,095.0 11/1/2022 18:00 11/1/2022 19:15 1.25 INTRM1, DRILL OWFF P MONITOR ALPINE C PORE PRESSURE VIA MPD SYSTEM. TRAP 400 PSI ON WELLBORE, BLEED DOWN TO 134 PSI, AFTER 17 MIN PRESSURE BUILDS TO 201 PSI. BLEED OFF TO 147PSI, AFTER 28 MIN PRESSURE BUILDS TO 206 PSI. ROT @ 5 RPM, 7K TQ 8,095.0 8,167.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 49/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/1/2022 19:15 11/2/2022 00:00 4.75 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 8,167‘ MD - T/ 8,545‘ MD 7,495‘ TVD, WOB =12, GPM =600, PSI ON =2,148, PSI OFF =2,143, RPM =120, TQ ON = 10K, FLOW OUT = 58%, ECD =11.93PPG, P/U WT = 235K, S/O WT = 178K, RT WT = 192K, ADT =3.62, TOTAL BIT HRS =54.17, TOTAL JAR HRS =60.35, MPD CONNECTION BACK PSI = 380 SPR’S @ 8,281’ MD, 7,258’ TVD MW = 10.3PPG TIME: 20:40 #1 MP – 30SPM – 660/350PSI 40SPM – 740/330PSI #2 MP – 30SPM – 580/350PSI 40SPM – 680/320PSI 8,167.0 8,545.0 11/2/2022 00:00 11/2/2022 06:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 8,545‘ MD TO 8,990' MD, 7861‘ TVD, WOB =12, GPM=600, PSI ON =2,148, PSI OFF =2,143, RPM =120, TQ ON = 10K, FLOW OUT = 58%, ECD = 11.93PPG, P/U WT = 235K, S/O WT = 178K, RT WT = 192K, ADT =4.0, TOTAL BIT HRS =58.17, TOTAL JAR HRS =64.35, MPD CONNECTION BACK PSI = 380 8,545.0 8,990.0 11/2/2022 06:00 11/2/2022 12:00 6.00 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 8,990‘ MD TO 9,358' MD, 8,290‘ TVD, WOB = 16K, GPM = 600, PSI ON = 2,230, PSI OFF = 2,140, RPM =100, TQ ON = 12K, FLOW OUT = 59%, ECD = 12.14 PPG, P/U WT = 271K, S/O WT = 185K, RT WT = 206K, ADT =4.45, TOTAL BIT HRS = 63.15, TOTAL JAR HRS =69.33, MPD CONNECTION BACK PSI = 380 8,990.0 9,358.0 11/2/2022 12:00 11/2/2022 17:45 5.75 INTRM1, DRILL DDRL P DRILL 8.75" INTERMEDIATE HOLE F/ 9,358‘ MD TO 9,789' MD, 8,713‘ TVD, WOB = 14K, GPM= 525, PSI ON = 1,898, PSI OFF = 1,790, RPM = 140, TQ ON = 15K, FLOW OUT = 60%, ECD = 12.24 PPG, P/U WT = 295K, S/O WT = 192K, RT WT = 230K, ADT = 4.6, TOTAL BIT HRS = 67.75, TOTAL JAR HRS = 73.93, MPD CONNECTION BACK PSI = 300 9,358.0 9,789.0 11/2/2022 17:45 11/2/2022 18:15 0.50 INTRM1, DRILL SRVY P OBTAIN FINAL SURVEY, TORQUE AND DRAG, AND SPRS @ 9,789' MD. 9,789.0 9,789.0 11/2/2022 18:15 11/2/2022 19:15 1.00 INTRM1, CASING CIRC P ROT AND RECIP PIPE FROM 9,789' MD TO 9,701' MD AT 530 GPM, 1,902 PSI, 56% F/O, 120 RPM, 9K TQ, 12.11 ECD, ROT WT - 209K. WEIGHTING UP TO 11 PPG. TOTAL STKS PUMPED = 9,159 9,789.0 9,789.0 11/2/2022 19:15 11/2/2022 20:30 1.25 INTRM1, CASING BKRM P BROOH FROM 9,789' MD TO 9,607' MD W/ 530 GPM, 1,909 PSI, 60% F/O, 120 RPM, 10K TQ, 12.2 ECD, ROT WT - 210K. 9,789.0 9,607.0 11/2/2022 20:30 11/2/2022 21:30 1.00 INTRM1, CASING OWFF P B/D TD. OWFF. ROT STRING AT 5 RPM W/ 8K TQ AND SLOWLY BLEED OFF WELLBORE PSI. CLOSED AIR VALVE AND OPEN BLOCK VALVE AT RCD HEAD AND OBSERVE FLOW DIMINISH TO ZERO. 9,607.0 9,607.0 11/2/2022 21:30 11/2/2022 22:00 0.50 INTRM1, CASING TRIP P RIH ON ELEVATORS F/ 9,607' MD TO 9,789' MD. S/O WT - 191K. 9,607.0 9,789.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 50/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/2/2022 22:00 11/3/2022 00:00 2.00 INTRM1, CASING BKRM P BROOH FROM 9,789' MD TO 9,466 MD W/ 525 GPM, 1,874 PSI, 58% F/O, 120 RPM, 10K TQ, 12.23 ECD, ROT WT - 207K. HOLDING 250 WHILE IN SLIPS VIA MPD. CIRC B/U ON FIRST STAND - TOTAL STKS PUMPED - 5,260. 9,789.0 9,466.0 11/3/2022 00:00 11/3/2022 11:00 11.00 INTRM1, CASING BKRM P BROOH FROM 9,466' MD TO 7,499 MD W/ 525 GPM, 1,704 PSI, 58% F/O, 120 RPM, 8K TQ, 12.17 ECD, ROT WT - 167K. HOLDING 250 WHILE IN SLIPS VIA MPD. 9,466.0 7,499.0 11/3/2022 11:00 11/3/2022 13:00 2.00 INTRM1, CASING BKRM T OBSERVE PACKOFF AT 9,466' MD. KILL PUMPS AND ROT DN @ 20 RPM TO 7,510' MD. STAGE PUMPS UP IN ½ BBL INCREMENTS EVERY 5 MIN ICP - 140 W/ 28% F/O, UP TO 530 GPM FCP - 1592 W/ 60% F/O. INCREASE ROTATION F/ 20 RPM STAGING UP TO 110 RPM W/ 6K TQ. 7,499.0 7,510.0 11/3/2022 13:00 11/3/2022 15:30 2.50 INTRM1, CASING BKRM T BROOH F/ 7,510' MD T/ 7,441' MD WORKING THROUGH PACKOFF AREA WITH 530 GPM, 1600 PSI, 110 RPM, 6-7K TQ, 56% F/O, ECD - 11.98, ROT P/U WT - 168K 7,510.0 7,441.0 11/3/2022 15:30 11/3/2022 15:45 0.25 INTRM1, CASING TRIP T STOP ROT. LOWER FLOW RATE T/ 350 GPM, 800 PSI. S/O THROUGH PACKOFF AREA F/ 7,441' MD T/ 7,513' MD. 7,441.0 7,513.0 11/3/2022 15:45 11/3/2022 20:30 4.75 INTRM1, CASING BKRM P BROOH F/ 7,513' MD T/ 7,063' MD W/ 530 GPM, 1560 PSI, 58% F/O, 110 RPM, 6K TQ, ECD - 12.07. MPD PSI WHILE IN SLIPS - 250 7,513.0 7,063.0 11/3/2022 20:30 11/3/2022 21:00 0.50 INTRM1, CASING SMPD P B/D TD. STRIP OUT OF THE HOLE F/ 7,063' MD T/ 6,958' MD. OBSERVE 30K OVERPULL AT 6,958' MD. ATTEMPT TO WORK BY OBSTRUCTION (X3) (FAILED). 7,063.0 6,958.0 11/3/2022 21:00 11/3/2022 22:00 1.00 INTRM1, CASING BKRM T RIH F/ 6,958' MD T/ 7,063' MD ON ELEVATORS. S/O WT - 154K. KELLY UP AND BROOH F/ 7,063' MD T/ 6,968' MD AT 530 GPM, 1500 PSI, 54% F/O, 110 RPM, 6K TQ, 164K HOOK LOAD WHILE PULLING PIPE. TOTAL STKS PUMPED - 5549 7,063.0 6,958.0 11/3/2022 22:00 11/3/2022 23:30 1.50 INTRM1, CASING SMPD P PUMP OUT OF THE HOLE AT 300 GPM, 525 PSI, 38% F/O, NO ROTATION, F/ 6,958' MD T/ 6,497' MD. 190k UP WT. MPD - 250 @ CONNECTIONS. 6,958.0 6,497.0 11/3/2022 23:30 11/4/2022 00:00 0.50 INTRM1, CASING BKRM P BROOH F/ 6,497' MD TO 6,405' MD W/ 530 GPM, 1490 PSI, 110 RPM, 6K TQ, 58% F/O. ECD - 12.04. P/U RT WT - 163K. MPD - 250 @ CONNECTIONS. 6,495.0 6,405.0 11/4/2022 00:00 11/4/2022 06:00 6.00 INTRM1, CASING BKRM P BROOH F/ 6,405' MD TO 4,416' MD W/ 530 GPM, 1260 PSI, 110 RPM, 4K TQ, 58% F/O. ECD - 12.16. P/U RT WT - 123K. MPD - 250 @ CONNECTIONS. 6,495.0 4,416.0 11/4/2022 06:00 11/4/2022 14:30 8.50 INTRM1, CASING BKRM P BROOH F/ 4,416' MD TO 2,811' MD W/ 530 GPM, 1090 PSI, 110 RPM, 2-3K TQ, 58% F/O. ECD - 11.95. P/U RT WT - 123K. MPD - 170 @ CONNECTIONS. OBSERVE INDICATIONS OF PACKOFFS @ 2,825' MD 4,416.0 2,811.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 51/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/4/2022 14:30 11/4/2022 15:00 0.50 INTRM1, CASING BKRM T RIH F/ 2,811 TO 2,904' MD AND PUMP BIT BALLING SWEEPS FOLLOWED BY HI-VIS SWEEP. CONTINUE TO BROOH @ 200 FT/HR F/ 2,904' MD T/ 2,809' MD W/ 530 GPM, 1060 PSI, 110 RPM, 2-3K TQ, 58% F/O. ECD - 11.95. P/U RT WT - 112K 2,904.0 2,809.0 11/4/2022 15:00 11/4/2022 17:00 2.00 INTRM1, CASING BKRM P BROOH F/ 2,809' MD TO 2,561' MD W/ 530 GPM, 1040 PSI, 160 RPM, 2K TQ, 58% F/O. ECD - 12.07. P/U RT WT - 108K. MPD - 150 @ CONNECTIONS. 2,809.0 2,561.0 11/4/2022 17:00 11/4/2022 18:30 1.50 INTRM1, CASING BKRM T AT 2,651' MD OBSERVE TQ INCREASE TO 13K AND OVERPULL OF 25K W/O ANY PUMP INCREASE. S/O, STOP ROTARY & ATTEMPT TO PULL W/ NO ROTATION (FAILED). ATTEMPT W/ 80 RPM AT 530 GPM (FAILED). ATTEMPT W/ 300 GPM, 20 RPM (FAILED). INCREASE RATE TO 530 GPM, 1000 PSI, 60% F/O, 80 RPM, 1K TQ AND SLOWLY WORK PAST OBSTRUCTION UP TO 2,520' MD 2,561.0 2,520.0 11/4/2022 18:30 11/4/2022 20:00 1.50 INTRM1, CASING BKRM P BROOH F/ 2,520' MD TO 2,338' MD W/ 530 GPM, 1030 PSI, 80 RPM, 1-2K TQ, 58% F/O, ECD - 12.24. UP WT - 102K. MPD - 150 AT CONNECTIONS 2,520.0 2,338.0 11/4/2022 20:00 11/4/2022 20:45 0.75 INTRM1, CASING CIRC P ROT AND RECIP PIPE F/ 2,338' MD T/ 2,241' MD W/ 530 GPM, 1050 PSI, 58% F/O, 50 RPM, 1K TQ, ECD - 12.20. UP WT - 97K. S/O WT - 99K, ROT WT - 104K. PUMP NUT PLUG SWEEP FOLLOWED BY HI-VIS. NOTING MINIMAL RETURNS AT SURFACE. TOTAL STKS PUMPED - 5791. 2,338.0 2,338.0 11/4/2022 20:45 11/4/2022 21:15 0.50 INTRM1, CASING STRP T STRIP IN THE HOLE F/ 2,338' MD TO 2,524' MD. MPD PSI @ 60 PSI. STRIP OUT OF THE HOLE F/ 2,524' MD T/ 2,338' MD. MPD PSI @ 100. DRIFTING BIT - BHA PAST PROBLEM ZONE. 2,338.0 2,338.0 11/4/2022 21:15 11/4/2022 22:45 1.50 INTRM1, CASING STRP P STRIP OOH F/ 2,338' MD T/ 581' MD. MPD PSI - 80. UP WT - 101K. MONITOR DISP VIA ACTIVE PIT SYSTEM. 2,338.0 581.0 11/4/2022 22:45 11/4/2022 23:30 0.75 INTRM1, CASING OWFF P OWFF - SIMOPS - PJSM FOR MPD BEARING REMOVAL 581.0 581.0 11/4/2022 23:30 11/5/2022 00:00 0.50 INTRM1, CASING MPDA P REMOVE MPD BEARING AND INSTALL TRIP NIPPLE 581.0 581.0 11/5/2022 00:00 11/5/2022 00:30 0.50 INTRM1, CASING MPDA P REMOVE MPD BEARING AND INSTALL TRIP NIPPLE 581.0 581.0 11/5/2022 00:30 11/5/2022 03:30 3.00 INTRM1, CASING BHAH P L/D INTERMEDIATE BHA F/ 581' MD AS PER SLMB REP. MONITOR DISP VIA TT. 581.0 0.0 11/5/2022 03:30 11/5/2022 04:30 1.00 INTRM1, CASING WWWH P M/U STACK FLUSHING TOOL AND FLUSH STACK W/ 838 GPM, 35 PSI, 58% F/O. 20 RPM. B/D TD. SIMOPS - CLEAR AND CLEAN RIG FLOOR - MOBILIZE 7" CSG EQUIPMENT TO THE RIG FLOOR. 0.0 0.0 11/5/2022 04:30 11/5/2022 05:00 0.50 INTRM1, CASING RURD P M/U TEST JT AND WEAR RING PULLER. DRAIN BOP STACK. PULL WEAR BUSHING PER FMC 0.0 0.0 11/5/2022 05:00 11/5/2022 06:00 1.00 INTRM1, CASING RURD P P/U & M/U 7" LANDING JT TO HANGER. MAKE DUMMY RUN. L/D SAME. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 52/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/5/2022 06:00 11/5/2022 08:00 2.00 INTRM1, CASING RURD P R/U TO RUN RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG. 0.0 0.0 11/5/2022 08:00 11/5/2022 08:15 0.25 INTRM1, CASING SFTY P PJSM WITH RIG CREW, DOYON CSG, & CPAI SUPERVISOR ON RUNNING CSG. 0.0 0.0 11/5/2022 08:15 11/5/2022 09:30 1.25 INTRM1, CASING PUTB P P/U AND M/U 7" 26# L-80 HYD563 SHOE TRACK TO 168' MD. BAKERLOC TO PIN OF JT# 4. CHECK FLOATS (GOOD) 0.0 168.0 11/5/2022 09:30 11/5/2022 15:00 5.50 INTRM1, CASING PUTB P CONT TO RIH F/ 168' MD T/ 2,630' MD W/ RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG AS PER TALLY DETAIL. S/O WT - 98K FILLING ON THE FLY AND TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TQ CONNECTIONS TO 9.4K FT/ LBS VIA THE VOLANT CRT. 168.0 2,630.0 11/5/2022 15:00 11/5/2022 15:30 0.50 INTRM1, CASING CIRC P STAGE UP PUMPS IN 1 BBL INCREMENTS T/ 6 BPM. ICP - 33, FCP - 113 W/ 35% F/O. TOTAL STKS PUMPED - 1211 (2X BU) 2,630.0 2,630.0 11/5/2022 15:30 11/5/2022 21:15 5.75 INTRM1, CASING PUTB P CONT TO RIH F/ 2,630 MD T/ 5,174'' MD W/ RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG AS PER TALLY DETAIL. S/O WT - 135K FILLING ON THE FLY AND TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TQ CONNECTIONS TO 9.4K FT/ LBS VIA THE VOLANT CRT. 2,630.0 5,174.0 11/5/2022 21:15 11/5/2022 22:30 1.25 INTRM1, CASING CIRC P RECIP PIPE F/ 5,174' MD TO 5,141' MD & CIRC B/U STAGING PUMPS UP TO 6 BPM, ICP - 101, FCP - 330 W/ 33% F/O. TOTAL STKS PUMPED - 3728 (1450 @ 6 BPM). UP WT - 145K, S/O WT - 134K 5,174.0 5,174.0 11/5/2022 22:30 11/6/2022 00:00 1.50 INTRM1, CASING PUTB P CONT TO RIH F/ 5,174' MD T/ 5,716' MD W/ RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG AS PER TALLY DETAIL. S/O WT - 146K FILLING ON THE FLY AND TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TQ CONNECTIONS TO 9.4K FT/ LBS VIA THE VOLANT CRT. 5,174.0 5,719.0 11/6/2022 00:00 11/6/2022 02:15 2.25 INTRM1, CASING PUTB P CONT TO RIH F/ 5,716' MD T/ 7,460' MD W/ RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG AS PER TALLY DETAIL. S/O WT - 155K FILLING ON THE FLY AND TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TQ CONNECTIONS TO 9.4K FT/ LBS VIA THE VOLANT CRT. 5,719.0 7,460.0 11/6/2022 02:15 11/6/2022 06:30 4.25 INTRM1, CASING CIRC P RECIP PIPE F/ 7,460' MD TO 7,421' MD & CIRC B/U STAGING PUMPS UP TO 5 BPM, ICP - 330, FCP - 485 W/ 32% F/O. UP WT - 186K, S/O WT - 158K. TOTAL STKS PUMPED - 9439. 7,460.0 7,460.0 11/6/2022 06:30 11/6/2022 13:30 7.00 INTRM1, CASING PUTB P CONT TO RIH F/ 7,460' MD T/ 9,624' MD W/ RUN 7" 26# L-80 HYD563 INTERMEDIATE CSG AS PER TALLY DETAIL. S/O WT - 168K FILLING ON THE FLY AND TOPPING OFF EVERY 10 JTS. MONITOR DISP VIA PIT #5. TQ CONNECTIONS TO 9.4K FT/ LBS VIA THE VOLANT CRT. 7,460.0 9,624.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 53/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/6/2022 13:30 11/6/2022 14:30 1.00 INTRM1, CASING PUTB P M/U 9.57' AND 4.65' PUPS AND RIH. C/O VOLANT CUP SEAL. M/U HANGER TO LANDING JT AND RIH. SET DN 50K @ 9,768' MD. 9,624.0 9,768.0 11/6/2022 14:30 11/7/2022 00:00 9.50 INTRM1, CASING PUTB T ATTEMPT TO LAND HANGER PAST 9,768' MD (FAILED). WORK STRING TO ACHIEVE CIRCULATION (FAILED). INCREASE PSI LIMITIATION TO 600, WORK STRING IN AN ATTEMPT TO REGAIN CIRCULATION. SUCCESSFULLY LAND HANGER AT 9779' MD. UNSUCCESSFULL ON ACHIEVING CIRCULATION. 290 BBLS PUMPED AWAY. 9,768.0 9,779.0 11/7/2022 00:00 11/7/2022 08:30 8.50 INTRM1, CASING PUTB T CONT TO ATTEMPT GAINING CIRCULATION. WORKING STRING F/ 9,779' MD T/ 9,700' MD. PUMPING ON THE UPSTROKE @ 1 BPM, 350 - 600 PSI, UP WT - 260K, S/O WT - 177K.. 9,768.0 9,779.0 11/7/2022 08:30 11/7/2022 16:00 7.50 INTRM1, CASING PUTB T L/D LANDING JT. L/D HANGER, P/U WORKING JT. ROT AND RECIP PIPE F/ 9,779' MD T/ 9,693' MD W/ 12 RPM 18K TQ, 258K P/U WT, 225K S/O WT, 2 BPM ON THE UP STROKE NOT EXCEEDING 600 PSI. ½ BPM ON THE DOWN STROKE NOT EXCEEDING 500 PSI, ATTEMPTING TO ESTABLISH CIRCULATION. 9,779.0 9,779.0 11/7/2022 16:00 11/7/2022 17:00 1.00 INTRM1, CASING PUTB T L/D WORKING SINGLE. M/U HANGER AND LANDING JT PER CSG AND FMC REPS. RIH AND LAND ON DEPTH @ 9,779' MD. S/O WT - 199K OBSERVE PSI SPIKE AND UNABLE TO INJECT. 9,779.0 9,779.0 11/7/2022 17:00 11/7/2022 19:00 2.00 INTRM1, CASING PUTB T POOH F/ 9,779' MD T/ 9,735' MD AND REMOVE HANGER AND LANDING JT. L/D 4.65' PUP FROM STRING. M/U HANGER AND LANDING JT & RIH T/ 9,775' MD AND LAND ON DEPTH. UP WT - 268K, S/O WT - 146K. 9,779.0 9,775.0 11/7/2022 19:00 11/7/2022 19:30 0.50 INTRM1, CASING CIRC T CIRC TO ESTABLISH INJECTION RATE. 148 GPM, 3.5 BPM, 650 PSI, 920 TOTAL STKS PUMPED. 9,775.0 9,775.0 11/7/2022 19:30 11/7/2022 21:15 1.75 INTRM1, CEMENT CIRC P B/D TD, R/U CEMENT HOSE TO THE VOLANT CRT. CIRC @ 2 BPM, 400 PSI - SIMOPS - PJSM WITH RIG CREW, SLMB CEMENTERS, DDI TP, CPAI RIG SUPERVISOR. 9,775.0 9,775.0 11/7/2022 21:15 11/8/2022 00:00 2.75 INTRM1, CEMENT CMNT P PT LINES WITH WATER AND TEST TO 650 LOW, 3500 HIGH (GOOD). PUMP 40 BBLS 12 PPG MUD PUSH @ 3 BPM, ICP - 483, FCP - 450. PUMP 132.7 BBLS OF 13 PPG LEAD CEMENT @ 4 BPM, ICP - 274, FCP - 320, PUMP 25 BBLS OF 15.6 PPG TAIL CEMENT @ 4 BPM, 50 PSI. DROP SHUT OFF PLUG AND KICK OUT W/ 10 BBLS OF WATER. CHASE PLUG WITH 135 BBLS OF 14 PPG LSND FROM THE PITS @ 6 BPM, ICP - 110 PSI, FCP - 281. PUMP 11 PPG LSND @ 5 BPM, ICP - 75. 9,775.0 9,775.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 54/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/8/2022 00:00 11/8/2022 01:15 1.25 INTRM1, CEMENT CMNT P CONT TO CHASE PLUG WITH PUMP 11 PPG LSND @ 5 BPM, ICP - 75. FCP - 500. SLOW RT TO 3 BPM, 375 PSI AND LAND PLUG @ 3490 STKS. CIP @ 00:39 HRS. PRESSURE UP TO 800 PSI AND HOLD FOR 5 MIN, BLEED OFF TO CHECK FLOATS. OBSERVE FLOATS NOT HOLDING. 9,775.0 9,775.0 11/8/2022 01:15 11/8/2022 02:00 0.75 INTRM1, CEMENT CMNT T RE-PRESSURE UP TO 800 PSI. BLEED AND CONFIRM FLOATS NOT HOLDING. RIG UP JUMPER HOSE TO STAND PIPE. APPLY 500 PSI AND MONITOR PRESSURES. - SIMOPS - B/D CEMENT LINE AND CLEAN CEMENT VALVES. 9,775.0 9,775.0 11/8/2022 02:00 11/8/2022 12:00 10.00 INTRM1, CEMENT WOC P WAIT ON CEMENT COMPRESSIVE STRENGHT TO REACH 100. OBSERVE PSI BUILD TO 650 AND BLEED BACK TO 480 AS NEEDED. SIMOPS - CLEAN MUD MANIFOLD CEMENT VALVES. WORK RIG PM'S AND ORGANIZATION AROUND THE RIG. C/O MCWS ANTENNA FOR MCWS. 9,775.0 9,775.0 11/8/2022 12:00 11/8/2022 13:00 1.00 INTRM1, CEMENT RURD P BLEED PSI, CHECK FLOATS (GOOD). B/O VOLANT CRT AND SERVICE. M/U VOLANT CRT. 9,775.0 9,775.0 11/8/2022 13:00 11/8/2022 14:00 1.00 INTRM1, CEMENT PACK P PRESSURE UP TAM-PKR PER HALLIBURTON REP. ESTABLISH BASELINE PRESSURE OF 580 PSI. EVERY 2-3 MIN INCREASE PSI 200 LBS @ 15 SPM. INCREASE T/ 692 AND HOLD (NO PSI DROP). INCREASE TO 889 AND HOLD (NO PSI DROP), INCREASE TO 1043 AND HOLD, OBSERVE PSI DROP TO 1033. INCREASE TO 1145 AND HOLD, OBSERVE DROP TO 1135. INCREASE TO 1252 OBSERCVE DROP TO 1246. INCREASE TO 1462 AND HOLD, OBSERVE DROP TO 1452. BLEED DOWN TO BASELINE PSI OF 600. 9,775.0 9,775.0 11/8/2022 14:00 11/8/2022 14:15 0.25 INTRM1, CEMENT CIRC P OPEN UP LOWER STAGE COLLAR PER HALLIBURTON REP. PUMP AT 3 BPM, 126 GPM, AND OBSERVE SHIFT OPEN AT 2079 PSI. 9,775.0 9,775.0 11/8/2022 14:15 11/8/2022 18:00 3.75 INTRM1, CEMENT CIRC P CIRC AT 3 BPM 375 PSI, 23% F/O. OBSERVE LOSS RATE OF 3 BPH. INCREASE RATE TO 4 BPH AND OBSERVE 20 BPH LOSS RATE, DECREASE RATE TO 2 BPH AND OBSERVE 3 BPH LOSS RATE. 9,775.0 9,775.0 11/8/2022 18:00 11/8/2022 22:00 4.00 INTRM1, CEMENT CIRC P R/U CEMENT HOSE AND MANIFOLD FOR CEMENT JOB. CONT TO CIRC VIA THE CEMENT LINE AT 3 BPM, 127 GPM, 26% F/O, 272 PSI. TOTAL STKS PUMPED - 5000 9,775.0 9,775.0 11/8/2022 22:00 11/9/2022 00:00 2.00 INTRM1, CEMENT CMNT P PJSM WITH ALL HANDS INVOLVED. PT LINES TO 630 LOW, 3500 HIGH (GOOD). PUMP 32.1 BBLS 11.0 PPG MUD PUSH AT 3 BPM, ICP - 280 FCP - 270 W/ 26% F/O. PUMP 165.7 BBLS OF 11.0 PPG CEMENT @ 3 BPM, ICP - 300 FCP - 280 W/ 26% F/O. DROP DART. 9,775.0 9,775.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 55/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/9/2022 00:00 11/9/2022 01:00 1.00 INTRM1, CEMENT CMNT P KICK OUT DART W/ 10 BBLS OF WATER @ 3 BPM, 290 PSI, 26% F/O. PUMP 75 BBLS OF 11.0 LSND @ 3 BPM, ICP - 313, FCP - 414, PUMP 55 BBLS OF 11.0 CONTAM PILL @ 3 BPM, ICP - 414, SLOW RT TO 2.5 BPM, FCP - 261, PUMP 11.0 PPG LSND TO BUMP PLUG @ 2 BPM, ICP - 461, FCP - 475. BUMP PLUG @ 1639 STKS. CIP @ 01:08 HRS. OBSERVE 30 BBLS OF CEMENT TO SURFACE. 9,775.0 9,775.0 11/9/2022 01:00 11/9/2022 01:15 0.25 INTRM1, CEMENT CIRC P PRESSURE UP TO 1800 AND HOLD. BLEED OFF PSI AND FLOW CHECK (STATIC). RE-PRESSURE UP TO 3390 PSI AND OBSERVE UPPER STAGE TOOL SHIFT OPEN W/ 25% RETURN FLO. 9,775.0 9,775.0 11/9/2022 01:15 11/9/2022 06:00 4.75 INTRM1, CEMENT CIRC P CIRC OUT CEMENT FROM ANNULUS BY STAGE PUMPS UP TO 210 GPM, ICP - 428 W/ 29% F/O, FCP - 300 W/ 31% F/O PUMP CONTAM PILL FOLLOWED BY HI VIS S/S. TOTAL STKS PUMPED - 11,165. DUMPED 77 TOTAL BBLS TO THE ROCKWASHER. 9,775.0 9,775.0 11/9/2022 06:00 11/9/2022 08:15 2.25 INTRM1, CEMENT RURD P L/D LANDING JT. REMOVE BAIL EXTRENSIONS. C/O ELEVATORS TO 5". CLEAR RIG FLOOR OF 7" HANDLING EQUIPMENT. 9,775.0 9,775.0 11/9/2022 08:15 11/9/2022 09:00 0.75 INTRM1, CEMENT WWWH P M/U STACK FLUSHING TOOL. FLUSH STACK W/ 900 GPM, MAKING 5 PASSES, FUNCTION ALL RAMS & ANNULAR, AND WASH STACK AGAIN AT SAME RATE. 9,775.0 9,775.0 11/9/2022 09:00 11/9/2022 10:30 1.50 INTRM1, CEMENT RURD P R/D STACK FLUSHING TOOL. R/U LANDING JT, 5" PUP, AND XO. KELLY UP TO TD. 9,775.0 9,775.0 11/9/2022 10:30 11/9/2022 13:30 3.00 INTRM1, CEMENT CLEN P CLEAN OUT ROCKWASHER, PITS, TROUGH, FLOW LINE, WHILE WAITING ON OBM FOR FREEZE PROTECT. 9,775.0 9,775.0 11/9/2022 13:30 11/9/2022 17:00 3.50 INTRM1, CEMENT CIRC P CIRC VIA PITS 1-5 @ 3 BPM, 163 PSI, 27% F/O. TOTAL STKS - 5536 9,775.0 9,775.0 11/9/2022 17:00 11/9/2022 18:00 1.00 INTRM1, CEMENT FRZP P PUMP HI VIS OBM SPACER (35 BBLS), FOLLOWED BY 85BBLS OF 11.0 PPG OBM @ 6 BPM, 250 GPM, 350 PSI, 35% F/O. DROP CLOSING PLUG. CHASE PLUG @ 6 BPM, 250 GPM, 550 PSI, 38% F/O. PLUG ON SEAT AT 977 STKS. PRESSURE UP TO 1700 PSI. OBSERVE FLOW OUT REDUCE TO 0 CONFIRMING UPPER STAGE TOOL CLOSED. BLEED OFF PSI. OWFF (STATIC) 9,775.0 9,775.0 11/9/2022 18:00 11/9/2022 19:00 1.00 INTRM1, CEMENT RURD P L/D 5" PUP, XO, AND LANDING JT. 9,775.0 9,775.0 11/9/2022 19:00 11/9/2022 20:00 1.00 INTRM1, CEMENT WWWH P M/U STACK FLUSHING TOOL AND FLUSH STACK WITH FRESH WATER. R/D FLUSHING TOOL B/D TD. 9,775.0 9,775.0 11/9/2022 20:00 11/9/2022 21:00 1.00 INTRM1, WHDBOP WWSP P P/U 4½ TEST JT. SET 9 5/8" X 7" PACKOFF AS PER FMC REP. TEST TO 5000 PSI FOR 10 MIN (GOOD). WITNESSED BY CPAI RIG MANAGER. 9,775.0 9,775.0 11/9/2022 21:00 11/9/2022 23:00 2.00 INTRM1, WHDBOP RURD P C/O 4½ IF SAVER SUB TO XT-39. SIMOP - CHANGE UPPER VBR'S TO 2 7/8" X 5". 9,775.0 9,775.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 56/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/9/2022 23:00 11/9/2022 23:45 0.75 INTRM1, WHDBOP BOPE P SET TEST PLUG W/ 4½ TEST JT AS PER FMC. FLOOD STACK AND SURFACE LINES W/ WATER. PERFORM SHELL TEST (GOOD). 9,775.0 9,775.0 11/9/2022 23:45 11/10/2022 00:00 0.25 INTRM1, WHDBOP BOPE P TEST ANNULAR TO 250 LOW, 2500 HIGH FOR 5/5 CHARTED MIN W/ 4½ TEST JT. AOGCC REP BRIAN BIXBY WAIVED WITNESS TO THE TEST. 9,775.0 9,775.0 11/10/2022 00:00 11/10/2022 09:00 9.00 INTRM1, WHDBOP BOPE P TEST BOPE ALL TESTS T/ 250 LOW 4,200 HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF MANUAL OPERATED & SUPER CHOKE TESTED T/ 250 LOW & 2,000 PSI FOR 5 CHARTED MIN, W/ 4 1/2" TEST JT TEST ANNULAR, 2 7/8" X 5" UPR, AND 3 1/2" X 6" LOWER VBR'S, W/ 2 7/8" TEST JT, TEST 2 7/8" X 5" UPR & ANNULAR, W/ 4" TEST JT, TEST 3 1/2" X 6" LOWER VBR'S, TEST CHOKE VALVES 1-15, MANUAL OPERATED & SUPER CHOKE, CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 4" FOSV X 2, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3000 PSI. MANIFOLD. = 1550 PSI. ACC = 1550 PSI AFTER ALL FUNCTIONS ON BOTTLES, 8 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 88 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 22 SEC. UPR = 7 SEC. BLIND / SHEARS = 6 SEC. LPR = 6 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS AOGCC REP BRIAN BIXBY WAIVED WITNESS @ 2300 HRS on 11/09/2022 9,775.0 9,775.0 11/10/2022 09:00 11/10/2022 10:00 1.00 INTRM1, WHDBOP RURD P PULL TEST PLUG AND INSTALL 6.937" ID WEAR BUSHING AS PER FMC. BLOW DOWN CHOKE MANIFOLD, KILL LINE, AND CHOKE LINE. 9,775.0 9,775.0 11/10/2022 10:00 11/10/2022 12:00 2.00 INTRM1, WHDBOP PULD P L/D 12 STDS OF 5" DP F/ DERRICK VIA TOP DRIVE AND TUGGER. SIMOPS - MOBILIZE TOOLS FOR UPCOMING BHA. SURFACE BREAK MWD TOOL AND RETURN THE THE SHED. 9,775.0 9,775.0 11/10/2022 12:00 11/10/2022 15:00 3.00 INTRM1, WHDBOP SLPC P SLIP AND CUT 87' (6 WRAPS) OF 1.375 DRILL LINE. CALIBRATE BLOCKS AND HOOKLOAD. 9,775.0 9,775.0 11/10/2022 15:00 11/10/2022 16:00 1.00 INTRM1, DRILLOUT BHAH P P/U 6 1/8" CLEAN OUT BHA AS PER SLMB DD TO 559' MD. S/O WT - 59K. MONITOR DISP VIA TT. 0.0 559.0 11/10/2022 16:00 11/10/2022 20:00 4.00 INTRM1, DRILLOUT PULD P SINGLE IN THE HOLE ON 4" DP F/ 559' MD T/ TOP OF UPPER STAGE COLLAR @ 2,541' MD. UP WT - 77K, S/O WT - 80K. MONITOR DISP VIA TT. 559.0 2,541.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 57/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/10/2022 20:00 11/10/2022 21:15 1.25 INTRM1, DRILLOUT DRLG P WASH DN F/ 2,541' MD T/ TOP OF STAGE TOOL AT 2,553' MD. SET DN 5K. DRILL UPER STAGE TOOL F/ 2,553' MD T/ 2,556 W/ 50 RPM, 1K TQ, 245 GPM, 430 PSI, 38% F/O, WOB - 3- 10K 2,541.0 2,556.0 11/10/2022 21:15 11/10/2022 21:45 0.50 INTRM1, DRILLOUT PRTS P PRESSURE TEST CSG @ 2,556' MD TO 600 PSI FOR 10 MIN (GOOD) 11 STKS TO PRESSURE UP 1 BBL BLED BACK. 2,556.0 2,556.0 11/10/2022 21:45 11/11/2022 00:00 2.25 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" FROM PIPESHED F/ 2,556' MD T/ 3,548' MD. UP WT - 89K, S/O WT - 86K. MONITOR DISP VIA TT. 2,556.0 3,548.0 11/11/2022 00:00 11/11/2022 01:00 1.00 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" FROM PIPESHED F/ 3,548' MD T/ 4,527' MD. UP WT - 93K, S/O WT - 90K. MONITOR DISP VIA TT. 3,548.0 4,527.0 11/11/2022 01:00 11/11/2022 01:45 0.75 INTRM1, DRILLOUT DRLG P WASH AND REAM F/ 4,527' MD T/ 4,555' MD @ 250 GPM, 680 PSI, 50 RPM, 2-3K TQ, 36% F/O. ROT WT - 100K. OBSERVE 4K HOOKLOAD @ 4,540' MD. P/U AND OBSERVE OBSTRUCTION GONE. CONT TO WASH IN THE HOLE AND OBSERVE 10K HOOKLOAD @ 4548' MD AND SLOWLY DRILL OFF TO 0. 4,527.0 4,555.0 11/11/2022 01:45 11/11/2022 02:00 0.25 INTRM1, DRILLOUT PRTS P TEST CSG @ 4,555' MD TO 600 PSI FOR 10 MIN.(GOOD). 7 STKS TO PRESSURE UP, 1 BBL BLED BACK. B/D TD AND KILL LINE. 4,555.0 4,555.0 11/11/2022 02:00 11/11/2022 03:30 1.50 INTRM1, DRILLOUT PULD P CONT TO RIH W/ 4" DP FROM THE PIPESHED F/ 4555' MD T/ 5,768' MD. MONITOR DISP VIA TT. 4,555.0 5,768.0 11/11/2022 03:30 11/11/2022 05:30 2.00 INTRM1, DRILLOUT TRIP P CONT TO RIH W/ 4" DP FROM THE DERRICK F/ 5,768' MD T/ 2 STANDS ABOVE THE BAFFLE COLLAR @ 9,442' MD. MONITOR DISP VIA TT. 5,768.0 9,442.0 11/11/2022 05:30 11/11/2022 06:45 1.25 INTRM1, DRILLOUT CIRC P RECIP PIPE F/ 9,442' MD T/ 9,367' MD W/ 300 GPM, 1650 PSI, 38% F/O, 40 RPM, 6K TQ. UP WT - 161K, S/O WT - 115K, ROT WT - 140K. TREATING MUD AS NEEDED PER MUD MAN. 9,442.0 9,442.0 11/11/2022 06:45 11/11/2022 07:45 1.00 INTRM1, DRILLOUT TRIP P PUMP SLUG. B/D TD. POOH ON ELEVATORS F/ 9,442 MD T/ 9,161' MD. MONITOR DISP VIA TT. UP WT - 178K. 9,442.0 9,161.0 11/11/2022 07:45 11/11/2022 08:15 0.50 INTRM1, DRILLOUT TRIP P RIH ON ELEVATORS F/ 9,161 T/ 9,443' MD. MONITOR DISP VIA TT. S/O WT - 150K. 9,161.0 9,443.0 11/11/2022 08:15 11/11/2022 09:30 1.25 INTRM1, DRILLOUT WASH P KELLY UP AND WASH DN F/ 9,443' MD T/ 9,644' MD W/ 250 GPM, 1305 PSI, 50 RPM, 6K TQ, 35% F/O, ROT WT - 148K. 9,443.0 9,644.0 11/11/2022 09:30 11/11/2022 10:15 0.75 INTRM1, DRILLOUT DRLG P CLEAN AND PLISH TOP OF BAFFLE COLLAR F/ 9,644' MD T/ 9,648' MD W/ 250 GPM, 1206 PSI, 50 RPM, 7K TGQ, 33% F/O, 8-12K WOB. 9,644.0 9,648.0 11/11/2022 10:15 11/11/2022 11:15 1.00 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 9,648' MD TO 9,632' MD CONDITION MUD TO A 11.0 PPG IN/OUT @ 250 GPM, 1222 PSI, 33% F/O, 50 RPM, 7K TQ. TOTAL STKS PUMPED - 3418. 9,648.0 9,648.0 11/11/2022 11:15 11/11/2022 11:30 0.25 INTRM1, DRILLOUT OWFF P OWFF (STATIC) 9,648.0 9,648.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 58/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/11/2022 11:30 11/11/2022 16:45 5.25 INTRM1, DRILLOUT TRIP P POOH ON ELEVATORS F/ 9,648' MD T/ SURFACE. MONITOR DISP VIA TT. L/D BIT SUB AND BIT. 9,648.0 0.0 11/11/2022 16:45 11/11/2022 17:30 0.75 INTRM1, DRILLOUT BHAH P CLEAN AND CLEAR RIG FLOOR. SIMOPS - PREP FOR WIRELINE OPS. 0.0 0.0 11/11/2022 17:30 11/11/2022 18:30 1.00 INTRM1, DRILLOUT QEVL P PJSM W/ RIG CREW AND SLMB WIRELINE UNIT. P/U AND M/U WIRELINE TOOLS T/ 40'. 0.0 0.0 11/11/2022 18:30 11/11/2022 20:15 1.75 INTRM1, DRILLOUT QEVL T TROUBLE SHOOT INABILITY TO PASS BY WEAR BUSHING. FOUND LOWER SPRING CENTRALIZER WAS M/U UPSIDE DOWN CAUSING IT TO RESTRICT ITS COMPRESSABILITY. 0.0 0.0 11/11/2022 20:15 11/12/2022 00:00 3.75 INTRM1, DRILLOUT QEVL P RIH T/ 9,600' MD VIA WIRELINE. CBL FROM SURFACE SHOE (2,376' MD) TO 9,600' MD. 0.0 0.0 11/12/2022 00:00 11/12/2022 05:00 5.00 INTRM1, DRILLOUT QEVL P POOH F/ 9,600' MD AND LOG TO SURFACE. 0.0 0.0 11/12/2022 05:00 11/12/2022 06:00 1.00 INTRM1, DRILLOUT QEVL P L/D AND R/D SLMB ELINE. 0.0 0.0 11/12/2022 06:00 11/12/2022 21:30 15.50 INTRM1, DRILLOUT PULD P L/D 89 STDS OF 5" DP VIA MOUSEHOLE. 0.0 0.0 11/12/2022 21:30 11/12/2022 22:45 1.25 INTRM1, DRILLOUT BHAH P MOBILIZE PRODUCTION BHA TO RIG FLOOR. SIMOPS - CLEAN AND CLEAR RIG FLOOR. 0.0 0.0 11/12/2022 22:45 11/13/2022 00:00 1.25 INTRM1, DRILLOUT BHAH P PJSM, P/U PRODUCTION BHA #4 AS PER SLMB DD TO 150' MD. 0.0 150.0 11/13/2022 00:00 11/13/2022 01:30 1.50 INTRM1, DRILLOUT BHAH P PJSM, P/U PRODUCTION BHA #4 AS PER SLMB DD FROM 150' MD TO 750' MD. MONITOR DISP VIA TT. 150.0 750.0 11/13/2022 01:30 11/13/2022 02:30 1.00 INTRM1, DRILLOUT TRIP P RIH WITH PRODUCTION BHA #4 W/ 4" DP FROM THE DERRICK F/ 750' MD T/ 2,638' MD. MONITOR DISP VIA TT. 750.0 2,638.0 11/13/2022 02:30 11/13/2022 03:30 1.00 INTRM1, DRILLOUT DHEQ P SHALLOW HOLE TEST MWD W/ 250 GPM, 1190 PSI, 33% F/O (FAILED). INCREASE PUMP RATE TO 305 GPM, 2005 PSI, 40% F/O. (FAILED) NO COMMUNICATION WITH THE SONICSCOPE AND TELESCOPE TOOLS. DECISION MADE TO POOH AND INSTALL BACKUP MWD AND SONICSCOPE. 2,638.0 2,638.0 11/13/2022 03:30 11/13/2022 04:30 1.00 INTRM1, DRILLOUT TRIP T B/D TD. POOH ON ELEVATORS F/ 2,638' MD T/ 197' MD. MONITOR DISP VIA TT. 2,638.0 197.0 11/13/2022 04:30 11/13/2022 06:45 2.25 INTRM1, DRILLOUT BHAH T CONT TO POOH W/ BHA. RACK BACK HWDP AND JAR STAND. L/D BHA #4 AS PER SLMB DD/MWD. MONITOR DISP VIA TT. 197.0 0.0 11/13/2022 06:45 11/13/2022 10:15 3.50 INTRM1, DRILLOUT BHAH T SLMB PREP NEW TOOLS TO BE PICKED UP. SURFACE CHECK MICROSCOPE AND VPWD ARE OPERATIONAL (GOOD). 0.0 0.0 11/13/2022 10:15 11/13/2022 12:00 1.75 INTRM1, DRILLOUT BHAH T M/U BHA #5 AS PER SLMB DD/MWD TO 459' MD. MONITOR DISP VIA TT. S/O WT - 56K 0.0 459.0 11/13/2022 12:00 11/13/2022 12:30 0.50 INTRM1, DRILLOUT BHAH T RIH W/ BHA #5 W/ HWDP AND JAR STAND FROM DERRICK F/ 459' MD T/ 748' MD. MONITOR DISP VIA TT. S/O WT - 63K 459.0 748.0 11/13/2022 12:30 11/13/2022 14:00 1.50 INTRM1, DRILLOUT TRIP T CONT TO RIH W/ BHA #5 ON 4" DP FROM THE DERRICK F/ 748' MD T/ 2,635' MD. MONITOR DISP VIA TT. 748.0 2,635.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 59/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/13/2022 14:00 11/13/2022 16:15 2.25 INTRM1, DRILLOUT DHEQ T SHALLOW HOLE TEST BHA W/ 250 GPM, 1590 PSI, 34% F/O (GOOD). 2,635.0 2,635.0 11/13/2022 16:15 11/13/2022 19:00 2.75 INTRM1, DRILLOUT TRIP P CONT TO RIH W/ BHA #5 F/ 2,635' MD T/ 9,631' MD. FILLING EVERY 20 STDS AND B/D TD. MONITOR DISP VIA TT. S/O WT - 124K 2,635.0 9,631.0 11/13/2022 19:00 11/13/2022 21:30 2.50 INTRM1, DRILLOUT CIRC P ROT AND RECIP PIPE F/ 9,361' MD T/ 9,267' MD AND CONDITION MUD W/ 250 GPM, 2645 PSI, 35% F/O, 40 RPM, 6K TQ, ROT WT - 148K. TOTAL STKS PUMPED - 7,312 9,631.0 9,631.0 11/13/2022 21:30 11/13/2022 23:15 1.75 INTRM1, DRILLOUT PRTS P R/U AND PT 7" 26" L-80 H563 INTERMEDIATE CSG TO 4200 PSI F/ 30 CHARTED MIN (GOOD). 46 STKS TO PRESSURE UP TO 4200, BLED BACK 4.5 BBLS. TEST WITNESSED BY EPA VIA TEAMS. 9,631.0 9,631.0 11/13/2022 23:15 11/14/2022 00:00 0.75 INTRM1, DRILLOUT WASH P OBTAIN SPR'S. WASH DN F/ 9,631' MD T/ TOP OF BAFFLE COLLAR AT 9,645' MD. CONFIRM W/ 7K SET DN. 9,631.0 9,645.0 11/14/2022 00:00 11/14/2022 01:30 1.50 INTRM1, DRILLOUT DRLG P DRILL BAFFLE COLLAR F/ 9,645' MD T/ 9,960 W/ 205 GPM, 1840 PSI, 31% F/O, 40 RPM, 8K TQ, 10K WOB. REAM THROUGH AREA 3X 9,645.0 9,960.0 11/14/2022 01:30 11/14/2022 01:45 0.25 INTRM1, DRILLOUT COCF P DRILL CEMENT F/ 9,960' MD T/ 9,689' MD W/ 230 GPM, 2,145 PSI, 34% F/O, 40 RPM, 7K TQ, 4-7K WOB. 9,960.0 9,689.0 11/14/2022 01:45 11/14/2022 02:00 0.25 INTRM1, DRILLOUT DRLG P DRILL FLOAT COLLAR F/ 9,689' MD T/ 9,692' MD W/ 205 GPM, 2110 PSI, 34% F/O, 40 RPM, 7K TQ, 4-6K WOB, REAM AREA 3X AT RATE AND 2X W/O ROTATION. 9,689.0 9,692.0 11/14/2022 02:00 11/14/2022 03:00 1.00 INTRM1, DRILLOUT DRLG P DRILL CEMENT F/ 9,692' MD TO TOP OF SHOE AT 9,772' MD W/ 250 GPM, 2,535 PSI, 34% F/O, 60 RPM, 7K TQ, 7K WOB. 9,692.0 9,772.0 11/14/2022 03:00 11/14/2022 03:15 0.25 INTRM1, DRILLOUT DRLG P DRILL FLOAT SHOE F/ 9,772' MD TO 9,775' MD W/ 205 GPM, 2607 PSI, 34% F/O, 40 RPM, 7K TQ, 5-7K WOB. 9,772.0 9,775.0 11/14/2022 03:15 11/14/2022 03:45 0.50 INTRM1, DRILLOUT DRLG P DRILL RAT HOLE F/ 9,775' MD T/ 9,789' MD W/ 250 GPM, 2,551 PSI, 35% F/O, 80 RPM, 6K TQ, 5K WOB. WORK THROUGH SHOE 3X AT RATE AND 2X W/O ROTATION. 9,775.0 9,789.0 11/14/2022 03:45 11/14/2022 04:45 1.00 INTRM1, DRILLOUT CIRC P POOH UP INTO THE SHOE AT 9,765' MD AND ROT AND RECIP PIPE F/ 9,765' MD TO 9,735' MD W/ 250 GPM, 2,465 PSI, 35% F/O, 40 RPM, 7K TQ, ROT WT - 157K. TOTAL STKS PUMPED - 4,600 9,789.0 9,765.0 11/14/2022 04:45 11/14/2022 05:00 0.25 INTRM1, DRILLOUT OWFF P OWFF (STATIC) SIMOPS - PJSM WITH RIG CREW AND BEYOND REP FOR BEARING INSTALL. 9,765.0 9,765.0 11/14/2022 05:00 11/14/2022 05:45 0.75 INTRM1, DRILLOUT MPDA P POOH T/ 9,735' MD AND STD BACK STD. PULL TRIP NIPPLE AND INSTALL MPD BEARING. 9,765.0 9,735.0 11/14/2022 05:45 11/14/2022 06:00 0.25 INTRM1, DRILLOUT MPDA P CIRCULATE AND WARM UP MPD BEARING AS PER BEYOND REP. 9,735.0 9,735.0 11/14/2022 06:00 11/14/2022 06:15 0.25 INTRM1, DRILLOUT CIRC P OBTAIN SPR'S W/ BEARING INSTALLED. 9,735.0 9,735.0 11/14/2022 06:15 11/14/2022 06:45 0.50 INTRM1, DRILLOUT MPDA P CLEAN AND CLEAR RIG FLOOR FROM BEARING INSTALL. L/D TRIP NIPPLE. 9,735.0 9,735.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 60/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/14/2022 06:45 11/14/2022 09:15 2.50 INTRM1, DRILLOUT PULD P P/U SLMB POWERDRIVE AND SOFT BREAK CONNECTIONS FOR REPAIRS. P/U AND RACK BACK 12 STDS OF 4" DP VIA MOUSEHOLE. 9,735.0 9,735.0 11/14/2022 09:15 11/14/2022 09:30 0.25 INTRM1, DRILLOUT WASH P WASH DOWN F/ 9,735' MD T/ 9,789' MD W/ 250 GPM, 2435 PSI, 35% F/O, 40 RPM, 7K TQ. SIMOPS - SEND DOWNLIKS. 9,735.0 9,789.0 11/14/2022 09:30 11/14/2022 11:00 1.50 INTRM1, DRILLOUT DDRL P DRILL 20' NEW FORMATION F/ 9,789' MD T/ 9,809' MD W/ 250 GPM, 2475 PSI, 35% F/O, 100 RPM, 8K TQ, 6-11K WOB. 9,789.0 9,809.0 11/14/2022 11:00 11/14/2022 12:00 1.00 INTRM1, DRILLOUT REAM P ROT AND RECIP PIPE F/ 9,809' MD TO 9,726' MD W/ 250 GPM, 2430 PSI, 35% F/O, 40-80 RPM, 7K TQ, TOTAL STKS PUMPED - 2820 9,809.0 9,726.0 11/14/2022 12:00 11/14/2022 13:30 1.50 INTRM1, DRILLOUT FIT P R/U AND FIT. 905 PSI ACHIEVED (13.0 PPG EQUIVALENT). 11 STKS TO PRESSURE, .8 BBLS BLED BACK. B/D & R/D TESTING EQUIPMENT 9,726.0 9,726.0 11/14/2022 13:30 11/14/2022 14:00 0.50 INTRM1, DRILLOUT SFTY P PJSM WITH ALL HANDS ON DISP WELL TO 10.0 PPG LSND. SIMOPS - LOAD 48 JTS 4½ LINER INTO THE PIPESHED. 9,726.0 9,726.0 11/14/2022 14:00 11/14/2022 16:00 2.00 INTRM1, DRILLOUT DISP P PREP PITS AND ROCKWASHER FOR DISPLACEMENT. DISPLACE WELLBORE TO 10.0 PPG LSND. ROT AND RECIP PIPE F/ 9,726' MD T/ 9,632' MD @ 250 GPM, 3156 PSI, 34% F/O, 40 RPM, 7K TQ, ROT WT - 153K, TOTAL STKS PUMPED - 4045 9,726.0 9,726.0 11/14/2022 16:00 11/14/2022 17:00 1.00 INTRM1, DRILLOUT CIRC P UPON NEW MUD TO SURFACE. OBSERVE SCREENS BLINDING OFF. SCREEN DOWN. AND OBTAIN SPR'S. 9,726.0 9,726.0 11/14/2022 17:00 11/14/2022 17:30 0.50 INTRM1, DRILLOUT WASH P WASH DN F/ 9,726' MD TO 9,809' MD W/ 250 GPM, 2355 PSI, 33% F/O, 80 RPM, 5K TQ. 9,726.0 9,809.0 11/14/2022 17:30 11/15/2022 00:00 6.50 PROD1, DRILL DDRL P DRILL AHEAD F/ 9,809' MD T/ 10,050' MD, 8,971' TVD, W/ WOB - 11-15K, GPM - 275, PSI ON - 2528, PSI OFF - 2504, RPM - 120, TQ ON - 6K, TQ OFF - 4K, FO - 38%, ECD - 11.35. P/U WT - 180K, S/O WT - 156K, ROT WT - 165K, ADT - 7.24, TOTAL BIT HRS - 7.24, OTTAL JAR HRS - 7.24, MPD CONNECTIONS BACK PSI - 430 9,809.0 10,050.0 11/15/2022 00:00 11/15/2022 06:00 6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,050' MD T/ 10,377' MD, W/ WOB - 11-15K, GPM - 275, PSI ON - 2570, PSI OFF - 2550, RPM - 120, TQ ON - 7K, TQ OFF - 5K, FO - 39%, ECD - 11.43. P/U WT - 185K, S/O WT - 164K, ROT WT - 165K, MPD CONNECTIONS BACK PSI - 430 ADT - 5.46, TOTAL BIT HRS - 12.70, JAR HRS - 12.7. 10,050.0 10,377.0 11/15/2022 06:00 11/15/2022 12:00 6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,377' MD T/ 10,627' MD, W/ WOB - 11-15K, GPM - 275, PSI ON - 2498, PSI OFF - 2491, RPM - 130, TQ ON - 5K, TQ OFF - 4K, FO - 36%, ECD - 11.26. P/U WT - 185K, S/O WT - 164K, ROT WT - 165K, MPD CONNECTIONS BACK PSI - 450 ADT - 4.88, TOTAL BIT HRS - 17.58, JAR HRS - 17.58. 10,377.0 10,627.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 61/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/15/2022 12:00 11/15/2022 18:00 6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,627' MD T/ 10,864' MD, W/ WOB - 11-13K, GPM - 275, PSI ON - 2354, PSI OFF - 2348, RPM - 120, TQ ON - 7K, TQ OFF - 5K, FO - 36%, ECD - 11.11. P/U WT - 182K, S/O WT - 162K, ROT WT - 168K, MPD CONNECTIONS BACK PSI - 450 ADT - 5.43, TOTAL BIT HRS - 23.01, JAR HRS - 23.01. 10,627.0 10,864.0 11/15/2022 18:00 11/16/2022 00:00 6.00 PROD1, DRILL DDRL P DRILL AHEAD F/ 10,864' MD T/ 11,155' MD, W/ WOB - 11-15K, GPM - 255, PSI ON - 2390, PSI OFF - 2379, RPM - 120, TQ ON - 7K, TQ OFF - 4K, FO - 36%, ECD - 11.32. P/U WT - 188K, S/O WT - 163K, ROT WT - 173k, MPD CONNECTIONS BACK PSI - 450 ADT - 5.11, TOTAL BIT HRS - 28.12, JAR HRS - 28.12. ENCOUNTER 60 BPH LOSSES AT 10,915' MD. PUMPED 2 EA 30 BBL/25 PPB PROCOR LCM PILLS AND OBSERVE LOSS IMPROVE TO 20 BPH. 10,864.0 11,155.0 11/16/2022 00:00 11/16/2022 00:30 0.50 PROD1, TRIPCAS SRVY P COLLECT FINAL T&D VALUES. OBTAIN FINAL SURVEY. DROP 2.4" OD RABBIT W/ 100' TAIL. 11,155.0 11,153.0 11/16/2022 00:30 11/16/2022 06:00 5.50 PROD1, TRIPCAS BKRM P BROOH F/ 11,153' MD TO 9,730' MD W/ 275 GPM, PSI - 2600, REDUCE RT TO 250 PSI - , 2256% F/O, 120 RPM, 5K TQ, 160K UP WT AT RATE. IECD - 11.24, FECD - 11.22. 11,153.0 9,730.0 11/16/2022 06:00 11/16/2022 09:30 3.50 PROD1, TRIPCAS CIRC P ROT AND RECIP PIPE FROM 9,730' MD T/ 9,638' MD W/ 250 GPM, 2110 PSI, 36% F/O, 40 RPM, 3K TQ. TOTAL STKS PUMPED - 12,876. SIMOPS - PREP PROCOR LCM PILL IN PITS. 9,730.0 9,730.0 11/16/2022 09:30 11/16/2022 12:00 2.50 PROD1, TRIPCAS SMPD T STRIP IN THE HOLE F/ 9,730' MD T/ 10,913' MD. HOLDING 350 PSI WHILE RIH, AND 450 STATIC IN SLIPS. WASH AND REAM TIGHT SPOTS W/ 250 GPM, 40-100 RPM, 1-4K TQ @ 9,879, 10,002, 10,913' MD. 9,730.0 10,913.0 11/16/2022 12:00 11/16/2022 14:00 2.00 PROD1, TRIPCAS WASH T WASH TO BTM F/ 10,913' MD TO 11,155' MD W/ 200 GPM, 1675 PSI, 40 RPM, 4K TQ, 32% F/O, OBSERVE SLIGHT LOSSES @ INITIAL START UP RATE OF 250, DECREASE FLO RATE TO 200 10,913.0 11,155.0 11/16/2022 14:00 11/16/2022 14:45 0.75 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE F/ 11,155' MD TO 11,091' MD & CBU @ 200 GPM, 1676 PSI, 32% F/O, TOTAL STKS PUMPED - 2612 11,155.0 11,155.0 11/16/2022 14:45 11/16/2022 15:45 1.00 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE F/ 11,155' MD TO 11,091' MD & PUMP 55 BBLS OF PROCOR LCM PILL AT 200 GPM, 1677 PSI, 32% F/O, 40 RPM, 4K TQ. UP WT - 198K, S/O WT - 158K, ROT WT - 178K 11,155.0 11,155.0 11/16/2022 15:45 11/16/2022 16:00 0.25 PROD1, TRIPCAS CIRC T B/D TD. 11,155.0 11,155.0 11/16/2022 16:00 11/16/2022 18:45 2.75 PROD1, TRIPCAS SMPD T STRIP OOH F/ 11,155' MD TO 9,726' MD. HOLDING 700-600 PSI VIA MPD. MONITOR DISP VIA PIT 5. UP WT - 189K. 11,155.0 9,726.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 62/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/16/2022 18:45 11/16/2022 19:30 0.75 PROD1, TRIPCAS CIRC T ROT AND RECIP PIPE FROM 9,726' MD T/ 9,690' MD W/ 275 GPM, 2520 PSI, 36% F/O, 30 RPM, 3K TQ. ECD - 11.45. TOTAL STKS PUMPED - 2500. SIMOPS - PJSM ON DISPLACEMENT 9,726.0 9,726.0 11/16/2022 19:30 11/16/2022 20:45 1.25 PROD1, TRIPCAS DISP P ROT AND RECIP PIPE FROM 9,726' MD T/ 9,690' MD DISP 10.0 PPG LSND TO 10.0 PPG LSND W/ 275 GPM, 2520 PSI, 36% F/O, 30 RPM, 3K TQ, 11.45 ECD, ROT WT - 153K. OBSERVE 64 TOTAL BBL LOSS DURING DISPLACEMENT. TOTAL STKS PUMPED - 4400. OBSERVING 10.2 PPG MUD TO SURFACE AND SHUTTING DOWN. 9,726.0 9,726.0 11/16/2022 20:45 11/16/2022 21:30 0.75 PROD1, TRIPCAS OWFF P SHUT WELL IN VIA MPD. OBSERVE PSI STABILIZE AT 200. OPEN WELL AND SHUT IN AFTER 30 SEC AND OBSERVE PSI STABILIZE AT 190. REPEAT TIL OBSERVE PSI STABILIZE TO 160. DECISION MADE TO PUMP AT 2 BPM AND ATTEMPT TO GET 11.0 TO SURFACE WITH MINIMAL LOSSES. 9,726.0 9,726.0 11/16/2022 21:30 11/16/2022 22:00 0.50 PROD1, TRIPCAS CIRC P ROT AND RECIP PIPE F/ 9,726' MD TO 9,690' MD AND PUMP AT 2 BPM, 760 PSI, 60 RPM, 3K TQ. OBSERVE 11.0 TO SURFACE AT 519 STKS PUMPED. 9,726.0 9,726.0 11/16/2022 22:00 11/16/2022 23:15 1.25 PROD1, TRIPCAS OWFF P OWFF. CONFIRM BALLOONING. OBSERVE F/O DEMINISH FROM 8% F/O TO 2 IN 45 MIN. OBSERVE F/O ON MPD O. OBSERVE F/O AT RCD HEAD DEMINISH FROM 5 BPH TO 2.6 IN 30 MIN. 9,726.0 9,726.0 11/16/2022 23:15 11/17/2022 00:00 0.75 PROD1, TRIPCAS SMPD P STRIP OOH F/ 9,726' MD T/ 8,785' MD MPD HOLDING 220 OUT OF SLIPS AND 100 WHILE IN SLIPS. P/U WT - 173K. MONITOR DISP VIA PIT 1. 9,726.0 8,785.0 11/17/2022 00:00 11/17/2022 06:15 6.25 PROD1, TRIPCAS SMPD P CONT TO STRIP OOH F/ 8,785' MD T/ 843 MD. MONITOR DISP VIA PIT #1. FOLLOWING MPD STRIPPING SCHEDULE. UP WT - 62K 8,785.0 843.0 11/17/2022 06:15 11/17/2022 08:00 1.75 PROD1, TRIPCAS OWFF P OWFF - SIMOPS - PREP TOOLS/RIG FLOOR FOR BEARING REMOVAL AND TRIP NIPPLE INSTALL. 843.0 843.0 11/17/2022 08:00 11/17/2022 09:15 1.25 PROD1, TRIPCAS MPDA P PULL MPD BEARING AND INSTALL TRIP NIPPLE. 843.0 843.0 11/17/2022 09:15 11/17/2022 10:00 0.75 PROD1, TRIPCAS TRIP P POOH ON ELEVATORS F/ 843' MD T/ 197' MD. MONITOR DISP VIA TT. UP WT - 50K 843.0 197.0 11/17/2022 10:00 11/17/2022 12:30 2.50 PROD1, TRIPCAS BHAH P L/D BHA #5 AS PER SLMB DD/MWD F/ 197' MD. MONITOR DISP VIA TT. 197.0 0.0 11/17/2022 12:30 11/17/2022 13:30 1.00 PROD1, TRIPCAS BHAH P CLEAN AND CLEAR RIG FLOOR OF BHA #6. 0.0 0.0 11/17/2022 13:30 11/17/2022 14:15 0.75 COMPZN, CASING RURD P P/U BAKER CEMENT SWIVEL AND INSTALL XT-39 XO'S. L/D SAME. 0.0 0.0 11/17/2022 14:15 11/17/2022 14:30 0.25 COMPZN, CASING BOPE P DRAIN STACK. P/U 4" STAND AND FUNCTION ANNULAR, UPPER AND LOWER VBR'S PER WEEKLY FUNCTION TEST. 0.0 0.0 11/17/2022 14:30 11/17/2022 15:00 0.50 COMPZN, CEMENT RURD P P/U AND R/U DOYON CSG 4½ HANDLING EQUIPMENT. CONFIRM XO MADE UP TO SAFETY VALVE. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 63/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/17/2022 15:00 11/17/2022 15:30 0.50 COMPZN, CEMENT SFTY P PJSM W/ ALL HANDS ON RUNNING 4½ 12.6# L-80 HYD563 LOWER COMPLETION. 0.0 0.0 11/17/2022 15:30 11/17/2022 18:30 3.00 COMPZN, CEMENT PUTB P P/U 4½ 12.6# L-80 HYD563 LOWER COMPLETION SHOE TRAC TO 130' MD. CHECK FLOATS (GOOD). CONTINUE TO RIH AS PER DETAIL TO 1,540' MD. S/O WT - 56K. MONITOR DISP VIA #1. 0.0 1,540.0 11/17/2022 18:30 11/17/2022 19:30 1.00 COMPZN, CEMENT PUTB P C/O HANDLING EQUIPMENT TO 4". P/U AND M/U ZXP LINER HANGER ASSEMBLY PER BAKER REP. FILL TIE BACK W/ PAL MIX AND RIH T/ 1,568' MD. 1,540.0 1,568.0 11/17/2022 19:30 11/17/2022 20:00 0.50 COMPZN, CEMENT CIRC P KELLY UP TO STD #1, RIH T/ 1,673' MD AND CIRC LINER VOLUME W/ 3 BPM, 214 PSI, 27% F/O, P/U WT - 57K, S/O WT - 61K, W/O PUMPS ROT W/ 10 RPM, .5K TQ, ROT WT - 58K. TOTAL STKS PUMPED - 359 1,568.0 1,673.0 11/17/2022 20:00 11/18/2022 00:00 4.00 COMPZN, CEMENT RUNL P RIH OUT OF THE DERRICK W/ 4" DP F/ 1,673' MD T/ 5,920' MD. FILLING EACH STD ON THE FLY AND TOPPING OFF EVERY 5 STANDS VIA FILL UP HOSE. MONITOR DISP VIA PIT #1. S/O WT - 103K, P/U WT - 107K 1,673.0 5,920.0 11/18/2022 00:00 11/18/2022 03:45 3.75 COMPZN, CEMENT RUNL P RIH OUT OF THE DERRICK W/ 4" DP F/ 5,920' MD T/ 9,707' MD. FILLING EACH STD ON THE FLY AND TOPPING OFF EVERY 5 STANDS VIA FILL UP HOSE. MONITOR DISP VIA PIT #1. UP WT - 162K, S/O WT - 133K. 5,980.0 9,707.0 11/18/2022 03:45 11/18/2022 04:00 0.25 COMPZN, CEMENT OWFF P OWFF (STATIC) - SIMOPS - PJSM ON PULLING TRIP NIPPLE AND INSTALL MPD BEARING. 9,707.0 9,707.0 11/18/2022 04:00 11/18/2022 05:00 1.00 COMPZN, CEMENT MPDA P PULL TRIP NIPPLE AND INSTALL MPD BEARING. AND RIH F/ 9707' MD TO 9,770' MD. 9,707.0 9,770.0 11/18/2022 05:00 11/18/2022 05:30 0.50 COMPZN, CEMENT CLEN P PREP PITS FOR DISPLACEMENT. 9,770.0 9,770.0 11/18/2022 05:30 11/18/2022 08:15 2.75 COMPZN, CEMENT DISP P RECIP PIPE F/ 9,772' MD TO 9,707' MD. DISP WELL F/ 11.0 LSND TO 10.0 PPG FWP FOLLOWING MPD ROLLOVER MODEL. TOTAL STKS PUMPED - 3752. 9,770.0 9,770.0 11/18/2022 08:15 11/18/2022 08:30 0.25 COMPZN, CEMENT RUNL P OBTAIN TORQ & DRAG W/ 169 GPM, 830 PSI, 31% F/O, P/U WT - 160K, S/O WT - 136K, ROT WT - 147K, 4K TQ @ 10 RPM AND 20 RPM, 9,770.0 9,770.0 11/18/2022 08:30 11/18/2022 10:30 2.00 COMPZN, CEMENT RUNL P CONT TO STRIP IN THE HOLE F/ 9,770' MD T/ 11,129' MD. MPD HOLDING 250 DYNAMIC AND 450 STATIC. SO WT - 143K 9,770.0 11,129.0 11/18/2022 10:30 11/18/2022 11:30 1.00 COMPZN, CEMENT RUNL P P/U WORKING SINGLE AND BAKER CEMENT SWIVEL. STRIP IN THE HOLE F/ 11,129' MD TO 11,147' MD. TAG FILL. 11,129.0 11,147.0 11/18/2022 11:30 11/18/2022 11:45 0.25 COMPZN, CEMENT WASH P WASH DN F/ 11,147' MD TO 11,155' MD W/ 85 GPM, 880 PSI, 25% F/O, 10 RPM, 4K TQ. SPACE OUT TO 11,150' MD. 11,147.0 11,150.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 64/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/18/2022 11:45 11/18/2022 16:15 4.50 COMPZN, CEMENT CIRC P CIRC AND CONDTION MUD. ROT AND RECIP PIPE F/ 11,150' MD T/ 11,138' MD. STAGE UP TO 4 BPM. ICP - 895, 24% F/O, 10 RPM, 3K TQ, @ 4 BPM, 922 PSI, 30% F/O, 10 RPM, 3K TQ, OBSERVE LOSSES @ 4BPM. TOTAL STKS PUMPED - 8922. UP WT - 186K, S/O WT - 143K. 11,150.0 11,150.0 11/18/2022 16:15 11/18/2022 17:30 1.25 COMPZN, CEMENT RURD P SHUT DN PUMP. LINE UP MPD ON BACK SIDE AND HOLD 450 PSI. B/D TD. R/U CEMENT HOSE TO BAKER CEMENT SWIVEL. 11,150.0 11,150.0 11/18/2022 17:30 11/18/2022 18:45 1.25 COMPZN, CEMENT CIRC P ESTABLISH RATES THROUGH CEMENT LINE. ICP @ 2BPM - 693 PSI W/ 23 % F/O. 2½ BPM - 767 PSI, 28% F/O, 3 BPM - 835 PSI, 29% F/O, 3½ BPM - 930 PSI, 30% F/O. ROT WHILE ESTABLISHING RATES W/ 10 RPM AND 3K TQ, ROT WT - 163K. 11,150.0 11,150.0 11/18/2022 18:45 11/18/2022 21:45 3.00 COMPZN, CEMENT CMNT P PJSM, CEMENTERS PUMP 5 BBLS H20, TEST CEMENT LINES T/ 600 LOW AND 4,500 HIGH (GOOD). PUMP 20.1 BBLS 12# MUD PUSH II @ 2.4 BPM, ICP= 881 PSI, FCP= 591 PSI, 37% F/O. FOLLOWED BY 43.7 BBLS OF 15.6# TAIL CEMENT @ 3 BPM, ICP= 670, FCP= 127 PSI, 37% F/O. FLUSH 10 BBLS BRINE TO CEMENTERS W/ RIG PUMP. DROP DART AND CHASE WITH 120 BBLS OF BRINE (20 BBLS CI BRINE INSIDE LINER) @ 3BPM ICP= 25 PSI, FCP= 986 PSI. LATCHED UP TO WIPER PLUG @ 780 STKS, BUMPED PLUG @ 986 STKS, PRESSURE UP TO 1,500 PSI AND HOLD F/ 5 MIN. CIP @ 21:20 HRS. CHECK FLOATS (GOOD). 12 BBLS LOST DURING INITIAL SWAP TO RIG PUMPS VIA MPD BACK PRESSURE - 26 BBLS TOTAL LOST DURING TASK. 11,150.0 11,150.0 11/18/2022 21:45 11/18/2022 22:00 0.25 COMPZN, CEMENT PACK P SET LINER HANGER AND RELEASE FROM LINER AS PER BAKER REP WITH NO ISSUES. 11,150.0 9,582.0 11/18/2022 22:00 11/18/2022 23:30 1.50 COMPZN, CEMENT WAIT P WAIT ON TOWN EVALUATION OF CEMENT LIFT PRESSURE/LOSSES. SIMOPS - OWFF, PREP PITS FOR FLUID DISPLACEMENT. 9,582.0 9,582.0 11/18/2022 23:30 11/18/2022 23:45 0.25 COMPZN, CEMENT PACK P SET ZXHD PAKER PER BAKER REP WITH NO ISSUES.. 9,582.0 9,582.0 11/18/2022 23:45 11/19/2022 00:00 0.25 COMPZN, CEMENT WASH P POOH F/ 9,582' MD T/ 9525' MD AND WASH SEAL BORE EXTENSION W/ 3 BPM, 733 PSI, 33% F/O. UP WT - 156K 9,582.0 9,525.0 11/19/2022 00:00 11/19/2022 00:45 0.75 COMPZN, CEMENT DISP P AT 9,525' MD DISPLACE WELL TO 11.0 PPG BRINE AND REMOVE RESIDUAL CEMENT OFF LINER TOP AT 10 BPM, 2148 PSI, 44% F/O, TOTAL STKS PUMPED - 508 BBLS. ( OBSERVE CONTAMINATED CEMENT WITH CEMNET TO SURFACE AT 200BBLS. GOOD BRINE TO SURFACE AT 225 BBLS INTO DISPLACEMENT.. 25 TOTAL BBLS.) 9,525.0 9,525.0 11/19/2022 00:45 11/19/2022 01:00 0.25 COMPZN, CEMENT OWFF P OWFF (STATIC) 9,525.0 9,525.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 65/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/19/2022 01:00 11/19/2022 02:00 1.00 COMPZN, CEMENT RURD P L/D 2EA SINGLES AND BAKER CEMENT SWIVEL. B/D TD. 9,525.0 9,525.0 11/19/2022 02:00 11/19/2022 03:30 1.50 COMPZN, CEMENT MPDA P PULL MPD BEARING AND INSTALL TRIP NIPPLE. SIMOPS - CLEAN MUD MANIFOLD CEMENT VALVES - CLEAR AND CLEAN RIG FLOOR. 9,525.0 9,525.0 11/19/2022 03:30 11/19/2022 04:45 1.25 COMPZN, CEMENT PULD P POOH ON ELEVATORS LAYING DOWN 4" DP 1X1 F/ 9,525' MD T/ 8,601' MD. MONITOR DISP VIA TT. UP WT - 140K. 9,525.0 8,601.0 11/19/2022 04:45 11/19/2022 09:00 4.25 COMPZN, CEMENT TRIP P CONT TO POOH ON ELEVATORS F/ 8,601' MD TO SURFACE RACKING BACK IN THE DERRICK. MONITOR DISP VIA TT. 8,601.0 0.0 11/19/2022 09:00 11/19/2022 09:15 0.25 COMPZN, CEMENT BHAH P L/D BAKER BHA RUNNING TOOLS. 0.0 0.0 11/19/2022 09:15 11/19/2022 10:30 1.25 COMPZN, CEMENT PULD P L/D 5 STDS OF 4" HWDP AND 1 JAR STAND. 0.0 0.0 11/19/2022 10:30 11/19/2022 11:45 1.25 COMPZN, CEMENT BHAH P CLEAN AND CLEAR RIG FLOOR. SIMOPS - P/U BAKER SCRAPER RUN BHA VIA BEAVERSLIDE. 0.0 0.0 11/19/2022 11:45 11/19/2022 21:15 9.50 COMPZN, WELLPR QEVL P R/U AND RUN SLMB WIRELINE. COMPLETE GUAGE RING RUN & USIT/CBL/GR/CCL LOGS TO TOP OF THE LANDING COLLAR @ 11,019' MD. MONITOR DISP VIA TT. 0.0 0.0 11/19/2022 21:15 11/19/2022 22:45 1.50 COMPZN, WELLPR PRTS P P/T 4½ LINER TO 4200 PSI (GOOD). 4.5 BBLS TO PRESSURE UP AND 4.5 BBLS BLED BACK. TEST WITNESSED BY EPA VIA TEAMS. 0.0 0.0 11/19/2022 22:45 11/19/2022 23:45 1.00 COMPZN, WELLPR BHAH P M/U BAKER SCRAPER BHA TO 27' MD. MONITOR DIPS VIA TT. 0.0 27.0 11/19/2022 23:45 11/20/2022 00:00 0.25 COMPZN, WELLPR TRIP P TIH F/ 27' MD T/ 594' MD. S/O WT - 58K. MONITOR DISP VIA TT. 27.0 594.0 11/20/2022 00:00 11/20/2022 04:30 4.50 COMPZN, WELLPR TRIP P CONT TO TIH F/ 594' MD TO TOP OF LINER @ 9,478' MD. 594.0 9,478.0 11/20/2022 04:30 11/20/2022 05:00 0.50 COMPZN, WELLPR WASH P POLISH SBR AS PER BAKER & SCRAPE AREA FOR TNT PKR F/ 9,478' MD T/ 9,594' MD W/ 127 GPM, 271 PSI, 25% F/O, 20 RPM, 2 TQ, UP WT - 160K, S/O WT - 150K, ROT WT - 155K. TAG W/ NO GO @ 9,594' MD W/ 7K DN WT. 9,478.0 9,594.0 11/20/2022 05:00 11/20/2022 05:30 0.50 COMPZN, WELLPR WASH P WASH F/ 9,582' MD TO 9,507' MD W/ 3 BPM, 127 GPM, 259 PSI, 22% F/O, 20 RPM, 2K TQ. 9,594.0 9,582.0 11/20/2022 05:30 11/20/2022 06:30 1.00 COMPZN, WELLPR DISP P DISPLACE WELL TO 11.0 CI BRINE @ 8 BPM, 338 GPM, 1425 PSI, 39% F/O. RECIP PIPE F/ 9,582' MD TO 9,507' MD. TOTAL STKS PUMPED - 3793 (381 BBLS) 9,582.0 9,582.0 11/20/2022 06:30 11/20/2022 06:45 0.25 COMPZN, WELLPR OWFF P OWFF (STATIC) 9,582.0 9,582.0 11/20/2022 06:45 11/20/2022 21:00 14.25 COMPZN, WELLPR PULD P POOH F/ 9,582' MD TO 8,951' MD. L/D 4" DP 1X1. MONITOR DISP VIA TT. OBSERVE PIPE PULLING WET. PUMP 20 BBL SLUG. CONT TO POOH L/D 4" DP 1X1 TO 27' MD. SIMOPS - CLEAN PITS. 9,582.0 27.0 11/20/2022 21:00 11/20/2022 21:45 0.75 COMPZN, WELLPR BHAH P L/D BAKER SCRAPER BHA AS PER BAKER REP. 27.0 0.0 11/20/2022 21:45 11/20/2022 22:30 0.75 COMPZN, WELLPR PULD P P/U 5" TEST JT. PULL WEAR BUSHING AS PER FMC. 0.0 0.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 66/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/20/2022 22:30 11/20/2022 23:30 1.00 COMPZN, WELLPR WWWH P M/U STACK FLUSHING TOOL AND WASH WELLHEAD/STACK W/ 675 GPM, 88 PSI, 55% F/O, 20 RPM, .3K TQ. 0.0 0.0 11/20/2022 23:30 11/21/2022 00:00 0.50 COMPZN, RPCOMP RURD P R/U TO RUN 4½ 12.6# L-80 & L-83 HYD563 TBG. 0.0 0.0 11/21/2022 00:00 11/21/2022 01:30 1.50 COMPZN, RPCOMP RURD P R/U TO RUN 4½ 12.6# L-80 & L-83 HYD563 TBG. 0.0 0.0 11/21/2022 01:30 11/21/2022 01:45 0.25 COMPZN, RPCOMP SFTY P SAFETY MEETING HELD WITH ALL HANDS INVOLVED. 0.0 0.0 11/21/2022 01:45 11/21/2022 02:30 0.75 COMPZN, RPCOMP RCST P P/U AND MAKE UP INDEXING MULE SHOE, 3.75 DB NIPPLE, TNT PKR, 2EA JTS, SL QUARTS DHG AND MANDREL TO 157' MD. MONITOR DISP VIA TT. 0.0 157.0 11/21/2022 02:30 11/21/2022 03:30 1.00 COMPZN, RPCOMP RCST P M/U SINGLE WAY PLUG TO TEC- WIRE AS PER SLMB REPS. 157.0 157.0 11/21/2022 03:30 11/21/2022 06:00 2.50 COMPZN, RPCOMP RCST P CONT TO RIH W/ R/U TO RUN 4½ 12.6# L-80 & L-83 HYD563 TBG AS PER DETAIL F/ 157' MD T/ 1,980' MD. MONITOR DISP VIA TT. TQ ALL CONNECTIONS TO 3800 FT/LBS. 157.0 2,012.0 11/21/2022 06:00 11/21/2022 11:45 5.75 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-80, HYD 563 TBG F/ 2012' MD T/ 6,444' MD.S/O WT= 68K. MONITORING DISPLACEMENT VIA TRIP TANK, CALLING OUT EVERY 10 JTS. M/U TQ F/ HYD 563= 3,800 FT/LBS 2,012.0 6,444.0 11/21/2022 11:45 11/21/2022 12:00 0.25 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-83, HYD 563 TBG F/ 6,444' MD T/ 6732' MD.S/O WT= 110K. MONITORING DISPLACEMENT VIA TRIP TANK, CALLING OUT EVERY 10 JTS. M/U TQ F/ HYD 563= 3,800 FT/LBS 6,444.0 6,732.0 11/21/2022 12:00 11/21/2022 13:15 1.25 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-83, HYD 563 TBG F/ 6,732' MD T/ 7,747' MD.S/O WT= 113K. MONITORING DISPLACEMENT VIA TRIP TANK, CALLING OUT EVERY 10 JTS. M/U TQ F/ HYD 563= 3,800 FT/LBS 6,732.0 7,747.0 11/21/2022 13:15 11/21/2022 16:00 2.75 COMPZN, RPCOMP RCST P RIH W/ 4.5", 12.6#, L-80, HYD 563 TBG F/ 7,747' MD T/ 9,530' MD.S/O WT= 125K. MONITORING DISPLACEMENT VIA TRIP TANK, CALLING OUT EVERY 10 JTS. M/U TQ F/ HYD 563= 3,800 FT/LBS 7,747.0 9,530.0 11/21/2022 16:00 11/21/2022 16:30 0.50 COMPZN, RPCOMP RCST P S/O F/ 9530' MD T/ 9594' SET 5K SHEAR OUT. S/O T/ 9595' NO GO. VERIFY DEPTH PREP FOR SPACE OUT 9,530.0 9,594.0 11/21/2022 16:30 11/21/2022 17:00 0.50 COMPZN, RPCOMP RCST P P/U SPACE OUT PUPS AND SPACE OUT AS PER BAKER AND HALIBURTON REPS. VERIFY DEPTHS AND PIPE COUNT. P/U FMC HANGER AND INSTALL AS PER FMC REP. 237 CROSS COUPLINGS CLAMPS. 9,594.0 9,594.0 11/21/2022 17:00 11/21/2022 18:45 1.75 COMPZN, RPCOMP RCST P SLB TERMINATE CONTROL WIRE. TEST HANGER VOID AS PER FMC REP T/ 5000 PSI CHARTED 9,594.0 9,594.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 67/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/21/2022 18:45 11/21/2022 19:00 0.25 COMPZN, RPCOMP THGR P RIH W/ HANGER F/ 9,530' MD T/ 9,595' MD, S/O WT= 127K. LAND HANGER ON DEPTH 9,594.0 9,594.0 11/21/2022 19:00 11/21/2022 19:15 0.25 COMPZN, RPCOMP THGR P RUN IN LOCK DOWN SCREWS PER FMC REP 9,594.0 9,594.0 11/21/2022 19:15 11/21/2022 19:45 0.50 COMPZN, RPCOMP THGR P R/U TO TEST HANGER SEALS 9,594.0 9,594.0 11/21/2022 19:45 11/21/2022 20:00 0.25 COMPZN, RPCOMP THGR P TEST HANGER SEALS T/ 250 PSI LOW F/ 5 MIN, 2,500 HIGH F/ 10 MIN. (TEST GOOD) 9,594.0 9,594.0 11/21/2022 20:00 11/21/2022 22:00 2.00 COMPZN, RPCOMP THGR P DROP BALL AND ROD. M/U X/O AND HEAD PIN ON TOP OF LANDING JT. R/U CEMENT HOSE TO HEAD PIN 9,594.0 9,594.0 11/21/2022 22:00 11/21/2022 23:30 1.50 COMPZN, RPCOMP THGR P PRESSURE UP ON TBG T/ 4,200 PSI AND HOLD F/ 30 MIN. BLEED TBG T/ 3,000 PSI. PRESSURE UP IA T/ 4,200 PSI AND HOLD F/ 30 MIN. DUMP TBG PRESSURE AND SHEAR OUTTBG AND IA BOTH BLED OFF TO ZERO PSI. TOTAL VOL PUMPED= 5 BBLS, VOL BLED BACK= 5 BBLS 9,594.0 9,594.0 11/21/2022 23:30 11/22/2022 00:00 0.50 COMPZN, RPCOMP RURD P R/D LANDING JOINT, SUCK STACK OUT 9,594.0 9,594.0 11/22/2022 00:00 11/22/2022 00:30 0.50 COMPZN, RPCOMP RURD P R/D LANDING JOINT, PUMP STACK OUT 9,594.0 9,594.0 11/22/2022 00:30 11/22/2022 01:15 0.75 COMPZN, RPCOMP RURD P INSTALL BPV PER FMC REP AND TEST FROM BELOW TO 2,500 PSI F/ 10 MIN (TEST GOOD 9,594.0 9,594.0 11/22/2022 01:15 11/22/2022 02:30 1.25 COMPZN, RPCOMP RURD P CLEAN AND CLEAR RIG FLOOR 9,594.0 9,594.0 11/22/2022 02:30 11/22/2022 03:00 0.50 COMPZN, WHDBOP RURD P PULL RISER, INSTALL RCD TEST PLUG 9,594.0 9,594.0 11/22/2022 03:00 11/22/2022 04:30 1.50 COMPZN, WHDBOP RURD P R/D MPD SYSTEM SEND MPD EQUIPMENT OUT OF BOP DECK. 9,594.0 9,594.0 11/22/2022 04:30 11/22/2022 06:30 2.00 COMPZN, WHDBOP NUND P N/D BOPE 9,594.0 9,594.0 11/22/2022 06:30 11/22/2022 08:00 1.50 COMPZN, WHDBOP NUND P P/U POTATO MASHER AND BREAK ANNULAR CAP. 9,594.0 9,594.0 11/22/2022 08:00 11/22/2022 10:30 2.50 COMPZN, WHDBOP NUND P RACK BACK BOPS AND BREAK DOWN SPACER SPOOLS. SIMOPS LOAD FMC TREE IN PIPE SHED AND PREP FOR INSTALL 9,594.0 9,594.0 11/22/2022 10:30 11/22/2022 12:00 1.50 COMPZN, WHDBOP WWWH P SLB AND FMC TERMINATE CONROL LINE. SIMOPS CLEAN AND FLUSH MUD LINES WITH DEEP CLEAN PILL 9,594.0 9,594.0 11/22/2022 12:00 11/22/2022 14:30 2.50 COMPZN, WHDBOP WWWH P SLB AND FMC TERMINATE CONROL LINE, INSTALL TREE ADAPTER FLANGE 9,594.0 9,594.0 11/22/2022 14:30 11/22/2022 15:15 0.75 COMPZN, WHDBOP WWWH P R/U TEST TREE ADAPTER VOID T/ 5000 PSI, CHART F/ 10 MIN. 9,594.0 9,594.0 11/22/2022 15:15 11/22/2022 17:30 2.25 COMPZN, WHDBOP WWWH P BREAK UPPER AND LWR FLANGE ON WELL HEAD AND RE-ORIENTATE SSV AS PER FMC REP. SIMOPS R/D PIPE SKATE 9,594.0 9,594.0 11/22/2022 17:30 11/22/2022 18:45 1.25 COMPZN, WHDBOP WWWH P FILL WELL HEAD WITH DIESEL AND INSTALL TREE CAP 9,594.0 9,594.0 11/22/2022 18:45 11/22/2022 19:30 0.75 COMPZN, WHDBOP WWWH P TEST TREE TO 250 PSI LOW F/ 10 MIN, 5,000 PSI HIGH F/ 10 MIN (TEST GOOD) 9,594.0 9,594.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 68/68 CD1-33 Report Printed: 12/22/2022 Operations Summary (with Timelog Depths) Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/22/2022 19:30 11/22/2022 20:15 0.75 DEMOB, MOVE WWWH P REMOVE BPV PER FMC REPS 9,594.0 9,594.0 11/22/2022 20:15 11/22/2022 21:00 0.75 DEMOB, MOVE RURD P R/U FOR FREEZE PROTECT 9,594.0 9,594.0 11/22/2022 21:00 11/22/2022 22:00 1.00 DEMOB, MOVE FRZP P LRS FREEZE PROTECT W/ LVT. ICP= 550 PSI @ 2 BPM, FCP= 610 PSI @ 2 BPM. TOTAL VOL PUMPED= 40.5 BBLS 9,594.0 9,594.0 11/22/2022 22:00 11/22/2022 22:30 0.50 DEMOB, MOVE WWWH P INSTALL BPV PER FMC REPS 9,594.0 9,594.0 11/22/2022 22:30 11/23/2022 00:00 1.50 DEMOB, MOVE WWWH P SECURE WELL HEAD AND OBTAIN FINAL PRESSURES. OA= 0 PSI, IA= 0 PSI RIG RELEASED @ 00:00 HRS 11/23/22 9,594.0 9,594.0 Rig: DOYON 142 RIG RELEASE DATE 11/23/2022 Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 9/22/2022 00:00 Cementing End Date 9/17/2022 00:00 Wellbore Name CD1-33 Comment Cement Stages Stage # <Stage Number?> Description Cement Plug Objective Top Depth (ftKB) 5,944.0 Bottom Depth (ftKB) 8,000.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 109 BBLS 15.8 PPG CLASS G CEMENT PUMPED TROUGH RETAINER. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 9/22/2022 00:00 Cementing End Date 9/17/2022 00:00 Wellbore Name CD1-33 Comment Cement Stages Stage # <Stage Number?> Description Cement Plug Objective Top Depth (ftKB) 5,944.0 Bottom Depth (ftKB) 7,658.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 1 BBL 15.8 PPG CLASS G CEMENT PUMPED ON TOP OF RETAINER Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Squeeze Cementing Start Date 10/8/2022 17:00 Cementing End Date 10/7/2022 18:15 Wellbore Name CD1-33 Comment PT lines to 2500 psi. Pump 20 bbls of 15.8 class G cement. Chased and squeeze with 36 bbls of 9.8 brine. Cement Stages Stage # 1 Description Squeeze – Behind Casing Squeeze Objective Isolate Qannik formation Top Depth (ftKB) 4,100.0 Bottom Depth (ftKB) 4,110.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 2 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 2 P Pump Final (psi) 239.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Squeeze 20 bbls of 15.8 ppg cement at 2 bpm, 60-150 psi. Observe 820 max to break over formation. Cement Fluids & Additives Fluid Fluid Type Squeeze Perforations Fluid Description Estimated Top (ftKB) 4,046.0 Est Btm (ftKB) 4,110.0 Amount (sacks) 121 Class G Volume Pumped (bbl) 25.0 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sack) 4.92 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 47.0 Thickening Time (hr) 5.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Squeeze Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 10/8/2022 17:00 Cementing End Date 10/7/2022 18:15 Wellbore Name CD1-33 Comment Leave 5 bbls in string while pulling out of the cement retainer. Cement Stages Stage # 1 Description Plug – Plug Back / Abandonment Plug Objective Isolate lower Qannik Top Depth (ftKB) 3,988.0 Bottom Depth (ftKB) 4,223.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? Yes Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 3,988.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 4,046.0 Est Btm (ftKB) 4,110.0 Amount (sacks) 121 Class G Volume Pumped (bbl) 25.0 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sack) 4.92 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 47.0 Thickening Time (hr) 5.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Squeeze Cementing Start Date 10/10/2022 18:00 Cementing End Date 10/10/2022 18:40 Wellbore Name CD1-33 Comment PT lines to 2500 psi. Pump 14 bbls13.5 mud push. Pump 30 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 23 bbls 9.8 brine. Cement Stages Stage # 1 Description Cement Squeeze Objective Isolate upper Qannik Top Depth (ftKB) 3,892.0 Bottom Depth (ftKB) 3,923.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? Yes Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 4 P Pump Final (psi) 30.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Squeeze Perforations Fluid Description Estimated Top (ftKB) 3,202.0 Est Btm (ftKB) 3,988.0 Amount (sacks) 145 Class G Volume Pumped (bbl) 30.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sack) 5.06 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 105.0 Thickening Time (hr) 7.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Squeeze Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 10/10/2022 18:00 Cementing End Date 10/10/2022 18:40 Wellbore Name CD1-33 Comment 785' plug. Cement Stages Stage # 1 Description Cement Plug Objective Isolate the upper Qannik Top Depth (ftKB) 3,216.0 Bottom Depth (ftKB) 3,988.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? Yes Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 4 P Pump Final (psi) 30.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) 3,216.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 3,202.0 Est Btm (ftKB) 3,988.0 Amount (sacks) 145 Class G Volume Pumped (bbl) 30.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sack) 5.06 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 105.0 Thickening Time (hr) 7.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Squeeze Cementing Start Date 10/13/2022 22:30 Cementing End Date 10/13/2022 23:00 Wellbore Name CD1-33 Comment PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine. Cement Stages Stage # 1 Description Cement Squeeze Objective ISOLATE LOWER HALO Top Depth (ftKB) 3,028.0 Bottom Depth (ftKB) 3,070.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 4 P Pump Final (psi) 30.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Squeeze Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 10/13/2022 22:30 Cementing End Date 10/13/2022 23:00 Wellbore Name CD1-33 Comment 526' plug Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 2,800.0 Bottom Depth (ftKB) 3,118.0 Full Return? Yes Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 4 P Pump Final (psi) 30.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 2,632.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,800.0 Drill Out Diameter (in) 6 1/8 Comment PT lines to 2300 psi. Pump 14 bbls13.5 mud push. Pump 21 bbls 15.8 class G cement. Pump 6 bbls 13.5 mud push. Pump 17.2 bbls 9.8 brine. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Squeeze Cementing Start Date 10/16/2022 16:15 Cementing End Date 10/16/2022 16:45 Wellbore Name CD1-33 Comment @ 30 RPM, 1K TQ, PUMP 14BBL OF 13.5 PPG MUD PUSH, @ 4BPM, 260 PSI, 32% F/O. PUMP 25BBL OF 15.8 PPG CEMENT @ 4 BPM, 250 PSI, 36 % F/O. PUMP 6BBL 13.5 PPG MUD PUSH @ 4BPM 170 PSI, 29% F/O. PUMP 7BBL 9.8 PPG BRINE @ 4 BPM, 120 PSI, 29 % F/O. PUMP 3.5BBL OF 9.8 PPG, @ 2BPM, 110 PSI, 22% F/O. Cement Stages Stage # 1 Description Cement Squeeze Objective Top Depth (ftKB) 2,730.0 Bottom Depth (ftKB) 2,800.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 4 P Pump Final (psi) 30.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment @ 30 RPM, 1K TQ, PUMP 14BBL OF 13.5 PPG MUD PUSH, @ 4BPM, 260 PSI, 32% F/O. PUMP 25BBL OF 15.8 PPG CEMENT @ 4 BPM, 250 PSI, 36 % F/O. PUMP 6BBL 13.5 PPG MUD PUSH @ 4BPM 170 PSI, 29% F/O. PUMP 7BBL 9.8 PPG BRINE @ 4 BPM, 120 PSI, 29 % F/O. PUMP 3.5BBL OF 9.8 PPG, @ 2BPM, 110 PSI, 22% F/O. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Squeeze Page 1/1 CD1-33 Report Printed: 12/22/2022 Cement Cement Details Description Cement Plug Cementing Start Date 10/22/2022 19:16 Cementing End Date 10/22/2022 20:15 Wellbore Name CD1-33 Comment SLB PUMPS 2 BBLS H20, TEST SURFACE LINES T/ 500/2000 PSI (TEST GOOD). SLB PUMPS 34.6 BBLS 13.5# MUD PUSH II, SHUT DOWN AND DROP WIPER BALL. SLB PUMPS 32.5 BBLS 17# CEMENT, 5.4 BBLS 13.5# MUD PUSH II, SLB DISPLACE 13 BBLS 9.8# BRINE. ROTATE 20 RPM, 1K TQ DURING CEMENT JOB CEMENT WET @ 1920 HRS Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 2,060.0 Bottom Depth (ftKB) 2,488.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 412 P Pump Final (psi) 455.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) 2,229.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,380.0 Drill Out Diameter (in) 8 3/4 Comment SLB PUMPS 2 BBLS H20, TEST SURFACE LINES T/ 500/2000 PSI (TEST GOOD). SLB PUMPS 34.6 BBLS 13.5# MUD PUSH II, SHUT DOWN AND DROP WIPER BALL. SLB PUMPS 32.5 BBLS 17# CEMENT, 5.4 BBLS 13.5# MUD PUSH II, SLB DISPLACE 13 BBLS 9.8# BRINE. ROTATE 20 RPM, 1K TQ DURING CEMENT JOB Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack) Mix H20 Ratio (gal/sack) Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Cement Plug 1 Regg, James B (OGC) From:Brooks, Phoebe L (OGC) Sent:Tuesday, November 22, 2022 1:59 PM To:Rig 142 Cc:Regg, James B (OGC); Doyon 142 Company Man Subject:RE: CD1-33Weekly bop test Attachments:Doyon 142 10-05-22 Revised.xlsx; Doyon 142 10-11-22 Revised.xlsx; Doyon 142 10-17-22 Revised.xlsx; Doyon 142 10-26-22 Revised.xlsx; Doyon 142 11-10-22 Revised.xlsx Based on the type of operation/timeline, attached are revised reports as follows: Doyon 142 10 05 22 –Test reflects Initial Workover for CD1 33, PTD #2002120, sundry #322 459 Doyon 142 10 11 22 & 10 17 22 –Test reflects Weekly Workover for CD1 33, PTD #2002120, sundry #322 459 Doyon 142 10 26 22 –Test reflects Initial Drilling for CD1 33A, PTD #2221050 Doyon 142 11 10 22 –Test reflects Bi Weekly Drilling for CD1 33A, PTD #2221050 Please update your copies. Thank you, Phoebe Phoebe Brooks Research Analyst Alaska Oil and Gas Conservation Commission Phone: 907 793 1242 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From:Rig 142 <rig142@doyondrilling.com> Sent:Friday, November 18, 2022 1:21 PM To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Cc:Regg, James B (OGC) <jim.regg@alaska.gov>; Doyon 142 Company Man <d142cm@conocophillips.com> Subject:RE: CD1 33Weekly bop test 10/26 report would be the initial drilling report on a bi weekly test cycle Matthew . From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Sent:Thursday, November 17, 2022 10:18 AM To:Rig 142 <rig142@doyondrilling.com> Cc:Regg, James B (OGC) <jim.regg@alaska.gov> Subject:RE: CD1 33Weekly bop test revised reports 10 11 22 &10 17 22 – 2 10/27? If Drilling kicked off on 10/27, then the 10/26 report should also be Workover on CD1 33. Please clarify. Thank you, Phoebe Phoebe Brooks Research Analyst Alaska Oil and Gas Conservation Commission Phone: 907 793 1242 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From:Rig 142 <rig142@doyondrilling.com> Sent:Monday, November 14, 2022 1:41 PM To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Cc:Doyon 142 Company Man <d142cm@conocophillips.com> Subject:RE: CD1 33Weekly bop test Negative. Kicked off drilling 10/27. From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Sent:Monday, November 14, 2022 1:14 PM To:Rig 142 <rig142@doyondrilling.com> Subject:RE: CD1 33Weekly bop test Was the window cut at the time of the 10/05 report? Phoebe Brooks Research Analyst Alaska Oil and Gas Conservation Commission Phone: 907 793 1242 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From:Rig 142 <rig142@doyondrilling.com> Sent:Monday, November 14, 2022 10:59 AM To:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Cc:Regg, James B (OGC) <jim.regg@alaska.gov> Subject:RE: CD1 33Weekly bop test Consulted with Company Rep to correct findings. Reports 10/05, 10/11, 10/17 should have concluded Workover Weekly. Reports 10/26, 11/10 as Drilling Bi weekly. Report 10/17 had wrong PTD# and Sundry from original CD1 33 well. should be stated as current PTD# 2221050, Sundry # 322594. Revised attachment sent. Apologies 3 MATTHEW SAM Rig 142 Toolpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 From:Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Sent:Monday, November 14, 2022 9:43 AM To:Rig 142 <rig142@doyondrilling.com> Cc:Regg, James B (OGC) <jim.regg@alaska.gov> Subject:RE: CD1 33Weekly bop test The initial report on 10/05/22, witnessed by Austin McLeod, was revised to include Initial Drilling for CD1 33A based on his report. The subsequent report on 10/11/22 was changed to Weekly Drilling (based on the initial drilling report on 10/5) for CD1 33A and now this 10/17/22 report includes Weekly Workover with well name CD1 33A, but PTD #2002120 which is for CD1 33 (with reports 10/26 & 11/10 as Bi Weekly Drilling for CD1 33A)? Please clarify. Thank you, Phoebe Phoebe Brooks Research Analyst Alaska Oil and Gas Conservation Commission Phone: 907 793 1242 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From:Rig 142 <rig142@doyondrilling.com> Sent:Tuesday, October 18, 2022 3:19 PM To:Regg, James B (OGC) <jim.regg@alaska.gov>; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>; Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Subject:CD1 33Weekly bop test Weekly bop test form, test sequence, 2 test charts. Had a Failure on UPPER IBOP, changed out and re tested, FP on blinds, bleed air, re tested MATTHEW SAM CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft Lease No.: ADL0025559 Operator Rep: Suspend: P&A: X Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet Intermediate: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4416 Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Perforation Bridge plug 2772 ft 2675 ft 15.8 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing IA 1725 1712 1713 1710 OA 273 272 272 272 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Plug back for redrill. Tagged cement at 2675 ft MD and put 11k down pressure with no movement. Pressure tested good. Pushed test out an extra 15 minutes to ensure the rig heaters were not influencing the test pressure due to the heater next to the chart recorder being on and having some temperature swings. October 18, 2022 Guy Cook Well Bore Plug & Abandonment CRU CD1-33 ConocoPhilllips Alaska Inc. PTD 2002120; Sundry 322-459 None Test Data: P Casing Removal: Mike Tucker Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 11-28-18 2022-1018_Plug_Verification_CRU_CD1-33_gc 9 9 9 9 9 9 9 9 9 9 9 9 99 9 99999 11k down pressure with no movement. James B. Regg Digitally signed by James B. Regg Date: 2023.04.06 13:29:00 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL 0025559 Operator Rep: Suspend: P&A: X Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4416 Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Annulus Balanced 3118 ft 2800 ft 9.8 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing 0 IA 1624 1611 1596 OA 243 248 248 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Plug back for redrill. This plug covered perfs they shot into the 9-5/8" and 16" from 3070 ft MD to 3028 ft MD. Top of cement at 2800 ft; set down 10K lbs. Pressures listed were from digital gauge also had a chart recording. October 15, 2022 Kam StJohn Well Bore Plug & Abandonment CRU CD1-33 ConocoPhillips Alaska Inc. PTD 2002120; Sundry 322-459 none Test Data: P Casing Removal: rev. 11-28-18 2022-1015_Plug_Verification_CRU_CD1-33_ksj 9 9 9 9 9 9 99 99 9 9 9 9 9 9 9 9 Top of cement at g 2800 ft; set down 10K lbs. James B. Regg Digitally signed by James B. Regg Date: 2023.04.06 13:10:16 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL 0025559 Operator Rep: Suspend: P&A: X Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet Surface: 9 5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ 4400 Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Annulus Bridge plug 3982 ft 3217 ft 9.8 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing IA 1650 1626 1606 OA 196 205 205 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Tag and test of the upper Qannik sand isolatio cement plug. Top of cement tagged with drill pipe ad 10K lbs downweight - found at 3217 ft MD. MIT pressures from a digital gauge; also used a chart recording to document - good test. October 12, 2022 Kam StJohn Well Bore Plug & Abandonment CRU CD1-33 Conoco Phillips Alaska PTD 2002120; Sundry 322-459 None Test Data: P Casing Removal: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 11-28-18 2022-1012_Plug_Verification_CRU_CD1-33_ksj MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39.1 ft Total Depth: 10854 ft MD Lease No.: ADL025559 Operator Rep: Suspend: P&A: X Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ Feet Surface: 9-5/8" O.D. Shoe@ 2376 Feet Csg Cut@ Feet Intermediate: O.D. Shoe@ Feet Csg Cut@ Feet Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 4.5" O.D. Tail@ 7654 Feet Tbg Cut@ 4400 Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Bridge plug 4046 ft 3980 ft 9.8 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing 1600 1540 1530 IA OA Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Plug back for redrill. I witness the verifications if the plug isolating the Qannik sand. Top of cement was found to be at 3980 ft MD where 8k lbs was applied to the plug with drillpipe and re-tagged showing the same depth. An MIT was then completed with passing results. October 9, 2022 Lou Laubenstein Well Bore Plug & Abandonment CRU CD1-33 ConocoPhillips Alaska Inc PTD 2002120; Sundry 322-459 none Test Data: p Casing Removal: rev. 11-28-18 2022-1009_Plug_Verification_CRU_CD1-33_ll MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: n/a Rig Elevation: n/a Total Depth: 10,854 ft MD Lease No.: ADL0025559 Operator Rep: Suspend: P&A: XXX Conductor: 16 O.D. Shoe@ 114 Feet Csg Cut@ Feet Surface: 9 5/8 O.D. Shoe@ 2377 Feet Csg Cut@ Feet Intermediate: 7 O.D. Shoe@ 7878 Feet Csg Cut@ Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: 4 1/2" O.D. Tail@ 7654 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Retainer 7597 ft 5934 ft 9.8 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2241 2190 2172 IA 13 11 10 OA 684 680 680 Initial 15 min 30 min 45 min Result Tubing 533 535 530 IA 2208 2115 2072 OA 700 700 700 Remarks: Attachments: Brandon Boehme P Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased hole abandonment plug. I witnessed tag of cement in tubing with bailer on wireline. Also witnessed pressure test of Tbg then IA each for 30 minutes. September 25, 2022 Brian Bixby Well Bore Plug & Pressure Test CRU CD1-33 Conoco Phillips Alaska Inc. PTD 200-212; Sundry 322-456 none Test Data: P Casing Removal: rev. 11-28-18 2022-0925_Plug_Verification_CRU_CD1-33_bb Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased witnessed tag of cement in tubing with bailer on wireline. Retainer is Baker S-3 Permanent Packer. Tubing puched above. 15.8 ppg cement pumped down tubing and into IA for cased witnessed pressure test of Tbg then IA STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Subm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:142 DATE: 10/11/22 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name: PTD #2002120 Sundry #322-459 Operation: Drilling: Workover: X Explor.: Test: Initial: Weekly: X Bi-Weekly: Other: Rams:250/4200 Annular:250/4200 Valves:250/4200 MASP:3846 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1 P Permit On Location P Hazard Sec.P Lower Kelly 1 P Standing Order Posted P Misc.NA Ball Type 3 P Test Fluid Water Inside BOP 2 P FSV Misc 0 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0 NA Trip Tank P P Annular Preventer 1 13-5/8" 5M P Pit Level Indicators P P #1 Rams 1 3.5" x 6"P Flow Indicator P P #2 Rams 1 Blind/Shear P Meth Gas Detector P P #3 Rams 1 3.5" x 6"P H2S Gas Detector P P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 3-1/8" 5M P Time/Pressure Test Result HCR Valves 2 3-1/8" 5M P System Pressure (psi)3050 P Kill Line Valves 3 3-1/8" 5M FP Pressure After Closure (psi)1550 P Check Valve 0 NA 200 psi Attained (sec)9 P BOP Misc 0 NA Full Pressure Attained (sec)70 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): #6@2000 P No. Valves 14 P ACC Misc 0 NA Manual Chokes 1 P Hydraulic Chokes 1 P Control System Response Time:Time (sec) Test Result CH Misc 0 NA Annular Preventer 7 P #1 Rams 7 P Coiled Tubing Only:#2 Rams 7 P Inside Reel valves 0 NA #3 Rams 7 P #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:1 Test Time:4.5 HCR Choke 2 P Repair or replacement of equipment will be made within 0 days. HCR Kill 2 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 10-9-22 @ 10:00 Waived By Test Start Date/Time:10/11/2022 7:30 (date) (time)Witness Test Finish Date/Time:10/11/2022 19:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Kam StJohn Doyon Test Annular w/ 3.5" & 4.5" Test jt's. Test Rams #1 & #3 w/ both 3.5" & 4.5" Test jts, test 2ea 4" FOSV & 1ea 4" Dart. And 1ea 5" FOSV & Dart. All test 250psi-lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a FP on kill line valve #3, pulled bonnet, cleaned and greased paddle and seat, re-tested good. F. Carlo / H. Huntington CPAI A. Dorr / B. Marmon CRU CD1-33 Test Pressure (psi): d142cm@conocophillips.com rig142@doyondrilling.com Form 10-424 (Revised 08/2022) 2022-1011_BOP_Doyon142_CRU_CD1-33 10/11/22 CRU CD1-33 2002120 FP rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle FP on kill line valve #3, STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Subm it t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner: Rig No.:142 DATE: 10/17/22 Rig Rep.: Rig Email: Operator: Operator Rep.: Op. Rep Email: Well Name: PTD #2002120 Sundry #322-459 Operation: Drilling: Workover: X Explor.: Test: Initial: Weekly: X Bi-Weekly: Other: Rams:250/4200 Annular:250/4200 Valves:250/4200 MASP:3846 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1 FP Permit On Location P Hazard Sec.P Lower Kelly 1 P Standing Order Posted P Misc.NA Ball Type 2 P Test Fluid Water Inside BOP 1 P FSV Misc 0 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0 NA Trip Tank P P Annular Preventer 1 13-5/8" 5M P Pit Level Indicators P P #1 Rams 1 3.5" x 6"P Flow Indicator P P #2 Rams 1 Blind/Shear FP Meth Gas Detector P P #3 Rams 1 3.5" x 6"P H2S Gas Detector P P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 3-1/8" 5M P Time/Pressure Test Result HCR Valves 2 3-1/8" 5M P System Pressure (psi)3000 P Kill Line Valves 3 3-1/8" 5M P Pressure After Closure (psi)1500 P Check Valve 0 NA 200 psi Attained (sec)9 P BOP Misc 0 NA Full Pressure Attained (sec)70 P Blind Switch Covers: All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.): #6@2001 P No. Valves 14 P ACC Misc 0 NA Manual Chokes 1 P Hydraulic Chokes 1 P Control System Response Time:Time (sec) Test Result CH Misc 0 NA Annular Preventer 15 P #1 Rams 7 P Coiled Tubing Only:#2 Rams 7 P Inside Reel valves 0 NA #3 Rams 7 P #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:2 Test Time:8.3 HCR Choke 2 P Repair or replacement of equipment will be made within 0 days. HCR Kill 2 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 10-14-22 @ 10:43 Waived By Test Start Date/Time:10/17/2022 10:45 (date) (time)Witness Test Finish Date/Time:10/17/2022 19:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Kam StJohn Doyon Test Annular w/ 3.5" & 4" Test jt's. Test Rams #1 & #3 w/ both 3.5" & 4" Test jts, test 2ea 4" FOSV & 1ea 4" Dart. All test 250psi- lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a FP on top drive upper IBOP, changed, re-tested good. FP on Blinds, function air out, re-test good. M. Sam / H. Huntington CPAI M. Tucker/ M. Arthur CRU CD1-33 Test Pressure (psi): d142cm@conocophillips.com rig142@doyondrilling.com Form 10-424 (Revised 08/2022) 2022-1017_BOP_Doyon142_CRU_CD1-33 10/17/22 CRU CD1-33 2002120 FP FP lo, 4200psi-Hi 5min ea on chart. Test all H2S, gas, pvt and flow alarms, both audible & visual. All rams functioned from both the FP on primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a top drive upper IBOP, primary and remote controls. Drawdown conducted w/ 2ea Air, and 2ea Electric pumps. Bottle precharge 1000psi. Had a FP on Blinds, STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________COLVILLE RIV UNIT CD1-33 JBR 12/09/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 3-1/2" & 4-1/2" joints. Good test Test Results TEST DATA Rig Rep:Carlo/AllenOperator:ConocoPhillips Alaska, Inc.Operator Rep:Dorr/Marmon Rig Owner/Rig No.:Doyon 142 PTD#:2002120 DATE:10/5/2022 Type Operation:WRKOV Annular: 250/4200Type Test:INIT Valves: 250/5000 Rams: 250/5000 Test Pressures:Inspection No:bopSAM221006155942 Inspector Austin McLeod Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 5.5 MASP: 3846 Sundry No: 322-459 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 3 P Inside BOP 1 P FSV Misc 0 NA 14 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13-5/8 P #1 Rams 1 3-1/2x6 P #2 Rams 1 Blind/Shear P #3 Rams 1 3-1/2x6 P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8 P HCR Valves 2 3-1/8 P Kill Line Valves 3 3-1/8 P Check Valve 0 NA BOP Misc 0 NA System Pressure P3050 Pressure After Closure P1750 200 PSI Attained P9 Full Pressure Attained P68 Blind Switch Covers:PAll stations Bottle precharge P Nitgn Btls# &psi (avg)P6@1983 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P10 #1 Rams P7 #2 Rams P7 #3 Rams P7 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P2 HCR Kill P2 Originated: Delivered to:8-Sep-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 CD1-33 50-103-20357-00 908071484 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 26-Aug-22 0 12 CD1-35 50-103-20297-00 908071486 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 28-Aug-22 0 13 CD1-41 50-103-20328-00 908072045 Colville RiverElectromagnetic Pipe Xaminer Record (EPX-V)Field & Processed 29-Aug-22 0 14 CD2-02 50-103-20513-00 907988867 Colville River Multi Finger Caliper Field & Processed 12-Jul-22 0 15PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:CD1-33 PTD:200-212 T36990CD1-35 PTD:199-038 T36991CD1-41 PTD:200-017 T36992CD2-02 PTD:205-109 T36993Electromagnetic Pipe1CD1-3350-103-20357-00908071484Colville RiverXaminer Record (EPX-V)Field & Processed26-Aug-2201Kayla JunkeDigitally signed by Kayla Junke Date: 2022.09.09 09:43:03 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: NA Rig Elevation: NA Total Depth: 10854 ft MD Lease No.: ADL0025559 Operator Rep: Suspend: NA P&A: X Conductor: 16" O.D. Shoe@ 114 Feet Csg Cut@ NA Feet Surface: 9-5/8" O.D. Shoe@ 2377 Feet Csg Cut@ NA Feet Intermediate: NA O.D. Shoe@ NA Feet Csg Cut@ NA Feet Production: 7" O.D. Shoe@ 7878 Feet Csg Cut@ NA Feet Liner: NA O.D. Shoe@ NA Feet Csg Cut@ NA Feet Tubing: 4-1/2" O.D. Tail@ 7654 Feet Tbg Cut@ NA Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Open Hole Bottom 10,854 ft 7,406 ft 6.8 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2233 2126 2106 IA 274 273 271 OA 700 700 699 Initial 15 min 30 min 45 min Result Tubing 430 432 435 IA 2241 2157 2146 OA 710 709 709 Remarks: Attachments: I traveled to location to witness the tag and pressure test of a cement plug that had been curing twenty-seven hours. The plug was to abandon the Alpine interval. Cement was placed across the entire open hole section and brought up into the 4-1/2-inch tubing. One barrel of cement was layed on top of the retainer (7,626 ft) once unstung. A 2-1/2-inch bailer assembly weighing around 250 pounds was used. Proposed top of cement (TOC) was 7,560 ft (inclination 66 degrees). They encountered stringers at 7,348 ft and worked down to 7,406 ft MD (hard tag) with multiple licks and set downs. This put the tag depth 3 barrels high. Very slight remnants of cement was found in the bailer so they made a second run tagging at the same depth. No sample was found in the second run either. A passing pressure test of the tubing (MITT) was then done. I found no reason to pressure test the inner annulus due to no cement being place in that annulus yet with the tubing not punched but the application called for one so it was done (MITIA). Target pressure for both tests was 2000 psi. September 18, 2022 Austin McLeod Well Bore Plug & Abandonment Colville River Unit CD1-33 Conoco Phillips Alaska Inc PTD 2002120; Sundry 322-456 none Test Data: P Casing Removal: Brandon Boehme P Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 11-28-18 2022-0918_Plug_Verification_CRU_CD1-33_am tag depth 3 barrels high. 1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Convert from INJ to PROD 2. Operator Name:4. Current Well Class:5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9. Property Designation (Lease Number):10. Field/Pool(s): 11. Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 10854'None Casing Collapse Structural Conductor Surface Production Liner Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng (907) 265-6846 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Signature: 4-1/2" Packer: Baker S-3 Packer SSSV: None Tubing Grade: Travis Smith 2340' 7878' Perforation Depth MD (ft):Perforation Depth TVD (ft):Tubing Size: 7844' 114' 2377' 7039'7" 16" 9-5/8" 76' TVD Burst 7654' MD CRU CD1-33N/A Colville River Field/ Alpine Oil Pool 10854'7059'None PRESENT WELL CONDITION SUMMARY STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025559 7059' 200-212 P.O. Box 100360, Anchorage, Alaska 99510 50-103-20357-00-00 ConocoPhillips Alaska, Inc. Length Size 114' 2376' COMMISSION USE ONLY L-80 Tubing MD (ft): Open Hole: 7039-7059' TVD Packer: 7597' MD and 6981' TVD SSSV: N/A Authorized Title: Senior Interventions and Integrity Engineer Authorized Name: Travis Smith Open Hole: 7878-10854' MD 9/8/2021 travis.t.smith@conocophillips.com m n s 66 t D c s Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 6:49 pm, Aug 25, 2021 321-426 Travis T. Smith Digitally signed by Travis T. Smith Date: 2021.08.25 15:05:25 -08'00' 10-404 VTL 9/1/21 SFD 8/26/2021 DSR-8/25/21 X  JLC 9/1/2021 dts 9/1/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.09.01 17:49:34 -08'00' RBDMS HEW 9/2/2021 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 25 August 2021 Commissioner Jessie Chmielowski Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Commissioner Chmielowski, Enclosed please find the 10-403 Application for Sundry Approval for ConocoPhillips Alaska, Inc. well CRU CD1-22(PTD 200-212) to convert the injector well to development (producer) status. Please contact me at 670-4014 if you have any questions. Sincerely, Travis Smith WNS Intervention & Integrity Engineer ConocoPhillips Alaska, Inc. CRU CD1-33 (PTD# 200-212) Overview of Proposed Work Background & Objective: CRU CD1-33 (PTD# 200-212) is currently an injection well. To ease the drilling of disposal well WD-03 (during early 2022), the Alpine reservoir should be locally de-pressured in the vicinity of CD1. CD1-33 has been identified as the best candidate injector well for this operation. The proposal below outlines the overview steps of this conversion. Overview Steps: 1. Complete surface piping modifications to flow CD1-33 as a producer. 2. Pull A-1 injection valve from nipple at 1,723’ MD. As CD1-33 is further than 660’ from the navigable water line and Alpine facilities, the well will not use a SSSV during production. 3. Put well on production service. If necessary for flow, gas lift valves will be installed for artificial lift. CRU CD1-33 (PTD# 200-212) is currently an injection well. To ease the drilling of disposal well WD-03 (during early 2022), the Alpine reservoir should be locally de-pressured in the vicinity of CD1. CD1-33 has been identified as the best candidate injector well for this operation. Pull A-1 injection valve from nipple at 1 723’MD. As CD1-33 is further than 660’ from thePull A 1 injection valve from nipple at 1,723 MD. As CD1 33 is further than 660 from th navigable water line and Alpine facilities, the well will not use a SSSV during production. pp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y Samantha Carlisle at 10:06 am, Aug 04, 2022  '65  6)' ; 97/  ; &%/ UHTXLUHG RQ 2$ FDVLQJ2+ FHPHQW DFURVV 4DQQLN DQG +DOR 5HYLHZ ZLWK $2*&& IRU DSSURYDO EHIRUH SURFHHGLQJ ;; ;  SVL 97/  %23 WHVW SUHVVXUH WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ 3ODFH FHPHQW SOXJ LQ WKH  FDVLQJ DFURVV WKH +DOR DQG 4DQQLN SUHVVXUH WHVW DQG WDJ ;; GWV   Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.09.06 11:34:43 -08'00' RBDMS JSB 090722 &RQRFR3KLOOLSV$ODVND,QF   3RVW2IILFH%R[   $QFKRUDJH$ODVND   7HOHSKRQH  $XJXVW  $ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ :HVWWK$YHQXH6XLWH $QFKRUDJH$ODVND  5H&KDQJHWR$SSURYHG6XQGU\IRU&58&' 37'   'HDU6LURU0DGDP  &RQRFR3KLOOLSV$ODVND,QFKHUHE\DSSOLHVIRUDVXQGU\SHUPLWWRUHHQWHUWKH&'ZHOOZLWKWKHLQWHQWLRQWRFHPHQWWKH 4DQQLN+DORIRUPDWLRQVDQGVHWDNLFNRIISOXJIRUIXWXUHVLGHWUDFNRSHUDWLRQV)XWXUHGULOOLQJRSHUDWLRQVLQFOXGHGULOOLQJ ´LQWHUPHGLDWHVHFWLRQDQGFHPHQWHGZLWK´FDVLQJ7KHSURGXFWLRQLQWHUYDOZLOOSHQHWUDWHWKH6DJ5LYHUDQG,YLVKDN GLVSRVDO]RQHDQGZLOOEHGULOOHGZLWK´KROHFDVHGDQGFHPHQWHGZLWK´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hange to Approved Sundry, Well CRU CD1-33 6DYHG$XJ  Change to Approved Sundry, Well CRU CD1-33 Page 1 of 5 Printed: 4-Aug-22 ϭͲϯϯ ƉƉůŝĐĂƚŝŽŶĨŽƌŚĂŶŐĞƚŽƉƉƌŽǀĞĚWĞƌŵŝƚƚŽƌŝůů   dĂďůĞŽĨŽŶƚĞŶƚƐ tĞůůEĂŵĞ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĨͿͿ WƌŽƉŽƐĞĚƌŝůůŝŶŐWƌŽŐƌĂŵ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĐͿ;ϭϯͿͿ ƚƚĂĐŚŵĞŶƚƐ ƚƚĂĐŚŵĞŶƚϭƵƌƌĞŶƚ^ĐŚĞŵĂƚŝĐ ................................................................................................................ 3 ƚƚĂĐŚŵĞŶƚϮWƌĞͲƌŝŐĂďĂŶĚŽŶŵĞŶƚƐĐŚĞŵĂƚŝĐ ............................................................................................ 4 ƚƚĂĐŚŵĞŶƚϯ^ĞƚƵƉĨŽƌƐŝĚĞƚƌĂĐŬƐĐŚĞŵĂƚŝĐ ............................................................................................... 5   Change to Approved Sundry, Well CRU CD1-33 6DYHG$XJ  Change to Approved Sundry, Well CRU CD1-33 Page 2 of 5 Printed: 4-Aug-22  tĞůůEĂŵĞ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĨͿͿ  dŚĞǁĞůůĨŽƌǁŚŝĐŚƚŚŝƐĂƉƉůŝĐĂƚŝŽŶŝƐƐƵďŵŝƚƚĞĚǁŝůůďĞĚĞƐŝŐŶ ĂƚĞĚĂƐZhϭͲϯϯ͘  WƌŽƉŽƐĞĚƌŝůůŝŶŐWƌŽŐƌĂŵ;ZĞƋƵŝƌĞŵĞŶƚƐŽĨϮϬϮϱ͘ϬϬϱ;ĐͿ;ϭϯͿͿ  dŚĞƉƌŽƉŽƐĞĚĚƌŝůůŝŶŐƉƌŽŐƌĂŵŝƐůŝƐƚĞĚďĞůŽǁ͘  ϭ͘D/ZhŽLJŽŶϭϰϮ͘ Ϯ͘dĞƐƚϳ͟ĐĂƐŝŶŐ͕ϳ͟ĐĂƐŝŶŐƉĂĐŬŽĨĨĂŶĚWsƚŚƌŽƵŐŚŝŶŶĞƌĂŶŶƵůƵ ƐƚŽϮ͕ϬϬϬƉƐŝĨŽƌϭϬŵŝŶƵƚĞƐ͕ĐŚĂƌƚWd͘ ϯ͘dĞƐƚƚƌĞĞĂĚĂƉƚŽƌƚŽϱ͕ϬϬϬƉƐŝ͘ ϰ͘WƵůůWs͘ ϱ͘ŝƌĐƵůĂƚĞĚŝĞƐĞůĨƌĞĞnjĞƉƌŽƚĞĐƚŽǀĞƌƚŽϵ͘ϴƉƉŐŬŝůůǁĞŝŐŚƚŵƵĚƚŚƌŽƵŐŚƚƌĞĞ͕ƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚŝŐĞƌƚĂŶŬ͘ ϲ͘^ĞƚWsĂŶĚƚĞƐƚƚŚƌŽƵŐŚŝŶŶĞƌĂŶŶƵůƵƐƚŽϭ͕ϱϬϬƉƐŝ͘ ϳ͘^ĞƚďůĂŶŬŝŶŐƉůƵŐ͘ ϴ͘EŝƉƉůĞĚŽǁŶƚƌĞĞ͘ ϵ͘EŝƉƉůĞƵƉKWĂŶĚƚĞƐƚƚŽϮϱϬͬϰϬϬϬƉƐŝǁŝƚŚϯ͘ϱ͕͟ϰ͟Θϰ͘ϱ͘͟ ϭϬ͘ZĞŵŽǀĞďůĂŶŬŝŶŐƉůƵŐĂŶĚWs͘ ϭϭ͘WƵůůϰͲϭͬϮ͟ƚƵďŝŶŐ;ƉƌĞͲĐƵƚĂƚΕϰ͕ϰϬϬDͿ͘ ϭϮ͘ZƵŶŝŶŚŽůĞǁŝƚŚ/WŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚƐĞƚĂƚΕϰ͕ϮϭϮ͛D͘WdƚŽϮ͕ϱϬϬƉƐŝ͘ ϭϯ͘ZŝŐƵƉŚĂƌĚůŝŶĞĨƌŽŵKǀĂůǀĞƚŽĐŚŽŬĞŵĂŶŝĨŽůĚ͘ ϭϰ͘ZƵŶŝŶŚŽůĞǁŝƚŚĚƌŝůůƉŝƉĞĐŽŶǀĞLJĞĚƉĞƌĨŽƌĂƚŝŶŐŐƵŶƐ͘WĞƌĨŽƌĂƚĞϳ͟ĐĂƐŝŶŐĂƚϰ͕ϮϬϮ͛D͘ ϭϱ͘ŝƌĐƵůĂƚĞϵ͘ϴƉƉŐ<t&ƚŚƌŽƵŐŚKǀĂůǀĞƚĂŬŝŶŐƌĞƚƵƌŶƐƚŚƌŽƵŐŚĐŚŽŬĞŵĂŶŝĨŽůĚƚŽƚŝŐĞƌƚĂŶŬ͘ ϭϲ͘ZƵŶŝŶŚŽůĞǁŝƚŚĐĞŵĞŶƚƌĞƚĂŝŶĞƌƚŽϰ͕ϭϱϬ͛DĂŶĚĐĞŵĞŶƚKƚŽϮϵϲϭ͛D;ϭϬϬ͛DĂďŽǀĞ,ĂůŽͿ ϭϳ͘ZƵŶŝŶŚŽůĞǁŝƚŚ/WŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚƐĞƚĂƚΕϮ͕ϳϬϬ͛D͘WdƚŽϮ͕ϱϬϬƉƐŝ ϭϴ͘ZƵŶŝŶŚŽůĞǁŝƚŚŵĞĐŚĂŶŝĐĂůĐĂƐŝŶŐĐƵƚƚĞƌŽŶϰ͟ĚƌŝůůƉŝƉĞĂŶĚĐ ƵƚĐĂƐŝŶŐĂƚϮ͕ϲϱϬ͛ΘϮ͕ϯϬϬ͛D͘ ϭϵ͘^ǁĂƉϯ͘ϱ͟džϲ͟ƌĂŵƐƚŽϳ͟ĐĂƐŝŶŐƌĂŵƐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƚŽϮϱϬͬϰϬϬϬƉƐŝ͘ ϮϬ͘WƵůůϳ͟ĐĂƐŝŶŐƚŽƐƵƌĨĂĐĞĂŶĚůĂLJĚŽǁŶ͘ Ϯϭ͘^ǁĂƉϳ͟ĐĂƐŝŶŐƌĂŵƐƚŽϯ͘ϱ͟džϲ͟ƌĂŵƐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘ ϮϮ͘ZŝŐƵƉůƵďƌŝĐĂƚŽƌĂŶĚZ/,ǁŝƚŚ>ƚŽůŽŐƐƵƌĨĂĐĞĐĂƐŝŶŐŝŶƚĞŐƌŝƚLJ͘ Ϯϯ͘Z/,ǁŝƚŚϯ͘ϱ͟ĐĞŵĞŶƚƐƚŝŶŐĞƌĂŶĚƐĞƚĐĞŵĞŶƚŬŝĐŬŽĨĨƉůƵŐĨƌŽŵƚŚĞƚŽƉŽĨďƌŝĚŐĞƉůƵŐƚŽϮϬϬĨƚŝŶƐŝĚĞƚŚĞ ƐƵƌĨĂĐĞƐŚŽĞ͘ Ϯϰ͘WͬhĚŝƌĞĐƚŝŽŶĂůĚƌŝůůŝŶŐ,ĂŶĚZ/,͘dĂŐdKĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐĂŶĚŬŝĐŬŽĨĨƉůƵŐƚŽϮ͕ϱϬϬƉƐŝ͘ Ϯϱ͘ZĞĂĚLJƚŽŵŽǀĞŝŶƚŽĚƌŝůůŝŶŐƉŚĂƐĞƵŶĚĞƌŶĞǁWd͘ Ϯϲ͘ĞŐŝŶŶĞǁWd͘  ĞŵĞŶƚŝŶŐĂůĐƵůĂƚŝŽŶƐ  ϳ͟WůƵŐĨŽƌYĂŶŶŝŬͬ,ĂůŽ/ƐŽůĂƚŝŽŶĨƌŽŵϰ͕ϮϬϮ͛DƚŽϮ͕ϵϲϭ͛DǁŝƚŚϭϱ͘ϴƉƉŐůĂƐƐ'нĂĚĚŝƚŝǀĞƐ dŽƚĂůsŽůƵŵĞсϯϰďďůƐсхϭϲϱƐdžŽĨϭϱ͘ϴƉƉŐůĂƐƐ'Λϭ͘ϭϲĨƚϯͬƐŬ  <ŝĐŬͲŽĨĨWůƵŐĨƌŽŵϮ͕ϳϬϬ͛DƚŽϮ͕ϭϳϲ͛DǁŝƚŚϭϳ͘ϬƉƉŐůĂƐƐ'нĂĚĚŝƚŝǀĞƐ dŽƚĂůsŽůƵŵĞсϱϰďďůƐсхϯϬϯƐdžŽĨϭϳ͘ϬƉƉŐůĂƐƐ'Λϭ͘ϬϬĨƚϯͬƐŬ  &%/ UTG $2*&& ZLWQHVV UHTXLUHG RI 37 DQG WDJ 97/  97/  )URP1DJHO0DWW% 7R/RHSS9LFWRULD7 2*& 6PLWK7UDYLV7 6XEMHFW5(>(;7(51$/@&58&'3OXJIRU5HGULOO 'DWH7KXUVGD\6HSWHPEHU30 hŶĚĞƌƐƚŽŽĚ͘dŚĂŶŬƐ͘  0DWW1DJHO 'ULOOLQJ(QJLQHHU &RQRFR3KLOOLSV$ODVND 2IILFH &HOO  0DWW%1DJHO#&RQRFR3KLOOLSVFRP  &ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗dŚƵƌƐĚĂLJ͕^ĞƉƚĞŵďĞƌϭ͕ϮϬϮϮϮ͗ϬϲWD dŽ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖^ŵŝƚŚ͕dƌĂǀŝƐd фdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗΀ydZE>΁ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů  DĂƚƚ͕  dŚĞĐĞŵĞŶƚĂĐƌŽƐƐƚŚĞYĂŶŶŝŬͬ,ĂůŽǁŝůůƌĞƋƵŝƌĞĂ>ƚŽǀĞƌŝĨLJĐĞŵĞŶƚƉůĂĐĞŵĞŶƚ͘  sŝĐƚŽƌŝĂ  Victoria Loepp 6HQLRU3HWUROHXP(QJLQHHU 6WDWHRI$ODVND 2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :WK$YH $QFKRUDJH$.  :RUN    9LFWRULD/RHSS#DODVNDJRY  CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov    &ƌŽŵ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭ͗ϱϲWD dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖^ŵŝƚŚ͕dƌĂǀŝƐd фdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗΀ydZE>΁Z͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů  ,ŝsŝĐƚŽƌŝĂ͕  WůĞĂƐĞƐĞĞŵLJƌĞƐƉŽŶƐĞƐďĞůŽǁŝŶƌĞĚ͘  0DWW1DJHO 'ULOOLQJ(QJLQHHU &RQRFR3KLOOLSV$ODVND 2IILFH &HOO  0DWW%1DJHO#&RQRFR3KLOOLSVFRP  &ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭϮ͗ϭϮWD dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖EĂŐĞů͕DĂƚƚ фDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗΀ydZE>΁Z͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů  dƌĂǀŝƐ͕DĂƚƚ͕  YƵĞƐƚŝŽŶƐŽŶ^ƵŶĚƌLJϯϮϮͲϰϱϵ ϭ͘ ,ŽǁǁŝůůLJŽƵǀĞƌŝĨLJƚŚĞϳ͟džK,ĐĞŵĞŶƚŝŶŐĂĐƌŽƐƐƚŚĞ,ĂůŽĂŶĚYĂŶŶŝŬ͍DĂLJŶĞĞĚĂ>͘ tĞĂƌĞŶŽƚƉůĂŶŶŝŶŐŽŶůŽŐŐŝŶŐƚŚĞϳ͟džK,ĐĞŵĞŶƚƉůƵŐ͘dŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐǁŝůůďĞůŽŐŐĞĚ ƚŽǀĞƌŝĨLJďŽƚŚƐƵƌĨĂĐĞĐĂƐŝŶŐĂŶĚƐƵƌĨĂĐĞĐĂƐŝŶŐĐĞŵĞŶƚŝŶƚĞŐƌŝƚLJ͘ůƐŽ͕ĂĨƚĞƌƉƵŵƉŝŶŐƚŚĞ ŬŝĐŬŽĨĨƉůƵŐŝŶƐŝĚĞƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐ͕ƚŚĞĐĂƐŝŶŐǁŝůůďĞƉƌĞƐƐƵƌĞƚĞƐƚĞĚϮϱϬϬƉƐŝƚŽĞŶƐƵƌĞ ŝƐŽůĂƚŝŽŶĨƌŽŵďĞůŽǁ͘ Ϯ͘ tŚLJŶŽƚĂĐĞŵĞŶƚƉůƵŐŝŶƐŝĚĞƚŚĞϳ͟ĐĂƐŝŶŐĂĐƌŽƐƐƚŚĞYĂŶŶŝŬĂŶĚ,ĂůŽ͍ dŚĞƌĞǁŝůůďĞĐĞŵĞŶƚĂďŽǀĞƚŚĞĂďĂŶĚŽŶŵĞŶƚƉĞƌĨŽƌĂƚŝŽŶƐĂŶĚŽŶƚŽƉŽĨƚŚĞďƌŝĚŐĞƉůƵŐ͘ dŚĞďƌŝĚŐĞƉůƵŐďĞůŽǁƚŚĞƉĞƌĨŽƌĂƚŝŽŶƐĂŶĚƚŚĞďƌŝĚŐĞƉůƵŐďĞůŽǁƚŚĞŝŶƚĞƌŵĞĚŝĂƚĞĐĂƐŝŶŐ ĐƵƚ͕ĂůŽŶŐǁŝƚŚƚŚĞƐƵƌĨĂĐĞŬŝĐŬŽĨĨƉůƵŐ͕ǁŝůůƉƌŽǀŝĚĞŽƵƌŝƐŽůĂƚŝŽŶŽĨƚŚĞϳ͟ĐĂƐŝŶŐ͘ ϯ͘ tŚĂƚĚĞƉƚŚŝƐƚŚĞYĂŶŶŝŬďŽƚƚŽŵŽĨƐĂŶĚ͍ ŽƚƚŽŵŽĨYĂŶŶŝŬƐĂŶĚŝƐƉŝĐŬĞĚƚŽďĞϰϮϮϱ͛DͬϰϬϳϬ͛ds͘ ϰ͘ DW^WŽŶƐƵŶĚƌLJŝƐϯϴϰϲƉƐŝ͕ŽŶWdŝƐϯϱϵϰƉƐŝ͘KWƚĞƐƚƉƌĞƐƐƵƌĞǁŝůůďĞƚŚĞƐĂŵĞŽŶďŽƚŚ͘ ϰϮϬϬƉƐŝ͘ hŶĚĞƌƐƚŽŽĚ͘  sŝĐƚŽƌŝĂ  Victoria Loepp 6HQLRU3HWUROHXP(QJLQHHU 6WDWHRI$ODVND 2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :WK$YH $QFKRUDJH$.  :RUN    9LFWRULD/RHSS#DODVNDJRY  CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended &$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP 'RQRWFOLFNOLQNVRURSHQDWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZ WKHFRQWHQWLVVDIH recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov     &ƌŽŵ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϯϭ͕ϮϬϮϮϭϬ͗ϰϭD dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗ZhϭͲϯϯWůƵŐĨŽƌZĞĚƌŝůů  ,ĞůůŽsŝĐƚŽƌŝĂͶ  /ǁĂƐĐƵƌŝŽƵƐĂďŽƵƚƚŚŝƐϭͲϯϯƉƌŽŐƌĂŵͶĚŽLJŽƵŚĂǀĞĂŶLJŽƚŚĞƌƋƵĞƐƚŝŽŶƐĨŽƌƚŚŝƐŽŶĞ͍ dŚĂŶŬƐǀĞƌLJŵƵĐŚ͊  dƌĂǀŝƐ  &ƌŽŵ͗^ŵŝƚŚ͕dƌĂǀŝƐd ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϮϰ͕ϮϬϮϮϰ͗ϭϭWD dŽ͗Ζ>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿΖфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗΀ydZE>΁ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů  ,ĞůůŽsŝĐƚŽƌŝĂͶ  ^ĞĞƚŚĞĂƚƚĂĐŚĞĚƌĞǀŝƐĞĚKǀĞƌǀŝĞǁWƌŽĐĞĚƵƌĞ͕ĂƐǁĞůůĂƐŵLJĂŶƐǁĞƌƐďĞůŽǁ͘WůĞĂƐĞůĞƚŵĞŬŶŽǁŝĨ LJŽƵŶĞĞĚŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ͊ dƌĂǀŝƐ  &ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϭϳ͕ϮϬϮϮϭϭ͗ϰϬD dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗΀ydZE>΁ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů  CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. dƌĂǀŝƐ͕  ϭ͘ WůĞĂƐĞƉƌŽǀŝĚĞDW^W Ă͘ >ĂƐƚ^,W;ϴͬϲͬϮϮͿǁĂƐϰϱϰϲƉƐŝĂƚϳϲϯϲ͛D;ϲϵϵϲ͛dsͿ͘hƐŝŶŐĂϬ͘ϭƉƐŝͬĨƚŐƌĂĚŝĞŶƚ͕ ƚŚĞDW^WŝƐϯϴϰϲƉƐŝ͘ Ϯ͘ /ƐĂĐĞŵĞŶƚďŽŶĚůŽŐĂǀĂŝůĂďůĞĨŽƌƚŚĞϳ͍͟,ŽǁǁĂƐƚŚĞdKŽĨϲϳϬϬ͛DĚĞƚĞƌŵŝŶĞĚ͍ Ă͘ dŚĞϲϳϬϬ͛DŝƐďĂƐĞĚŽŶĂǀŽůƵŵĞƚƌŝĐĐĂůĐƵůĂƚŝŽŶŽĨƚŚĞĐĞŵĞŶƚƉƵŵƉĞĚ͘ĂƐĞĚŽŶ ŽƚŚĞƌĂƐƐƵŵƉƚŝŽŶƐĨƌŽŵƐŝŵŝůĂƌǁĞůůƐŽĨƚŚĞĞƌĂ͕/͛ĚůŝŬĞƚŽƵƐĞĂϰϬйĞdžĐĞƐƐĂƐƐƵŵƉƚŝŽŶ ǁŚŝĐŚǁŽƵůĚƉůĂĐĞƚŚĞĞƐƚŝŵĂƚĞĚdKĂƚϳ͕Ϭϯϲ͛D͘>ǁĂƐƌƵŶƚŚƌŽƵŐŚͲƚƵďŝŶŐƚŚĂƚ ƐŚŽǁĞĚŐŽŽĚĐĞŵĞŶƚƚŽƚŚĞƚƵďŝŶŐƚĂŝůĂƚϳ͕ϲϱϯ͛D͘ ϯ͘ >ĂƐƚD/dͲ/ĂŶĚD/dͲd͍ Ă͘ ϲͬϭϰͬϮϭ͕ŶŽŶͲǁŝƚŶĞƐƐĞĚD/d/ƉĂƐƐĞĚƚŽϮ͕ϰϬϬƉƐŝ͘EŽƌĞĐĞŶƚD/ddƐ͘ ϰ͘ WůĞĂƐĞƉƌŽǀŝĚĞĨŽƌŵĂƚŝŽŶƉŝĐŬƐĨŽƌƚŚĞůƉŝŶĞŽŶƚŚĞt^ Ă͘ ϳϲϴϮ͛DŝƐůƉŝŶĞƚŽƉ͘^ĞĞĂƚƚĂĐŚĞĚƐĐŚĞŵĂƚŝĐŝŶƚŚĞKǀĞƌǀŝĞǁ͘ ϱ͘ ĂŶLJŽƵWdĂŶĚƚĂŐĂĨƚĞƌƚŚĞůƉŝŶĞƉůƵŐŝƐƐĞƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌĂƚϳϲϮϱ͛D͍dŚŝƐƉůƵŐǁŝůů ŶĞĞĚƚŽďĞǀĞƌŝĨŝĞĚ͘ Ă͘ zĞƐ͕ǁĞĐĂŶďƌĞĂŬƚŚĞĐĞŵĞŶƚŝŶŐŝŶƚŽƚǁŽũŽďƐƚŽƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘dŚŝƐǁŽƌŬĨůŽǁ ŝƐĚĞƚĂŝůĞĚŝŶƚŚĞƌĞǀŝƐĞĚWƌŽĐĞĚƵƌĞKǀĞƌǀŝĞǁĂƚƚĂĐŚĞĚŚĞƌĞ͘ ϲ͘ yEŶŝƉƉůĞĚĞƉƚŚŵŝƐůĂďĞůĞĚŽŶƐĐŚĞŵĂƚŝĐ͘^ŚŽƵůĚďĞϳϲϰϮ͛D͘ Ă͘ dŚĂŶŬLJŽƵ͕ƵƉĚĂƚĞĚ͘   dŚĂŶdž͕ sŝĐƚŽƌŝĂ  Victoria Loepp 6HQLRU3HWUROHXP(QJLQHHU 6WDWHRI$ODVND 2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :WK$YH $QFKRUDJH$.  :RUN    9LFWRULD/RHSS#DODVNDJRY  CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov  Change to Approved Sundry, Well CRU CD1-33 6DYHG$XJ  Change to Approved Sundry, Well CRU CD1-33 Page 3 of 5 Printed: 4-Aug-22 ƚƚĂĐŚŵĞŶƚƐ ƚƚĂĐŚŵĞŶƚϭƵƌƌĞŶƚ^ĐŚĞŵĂƚŝĐ                    Change to Approved Sundry, Well CRU CD1-33 6DYHG$XJ  Change to Approved Sundry, Well CRU CD1-33 Page 4 of 5 Printed: 4-Aug-22 ƚƚĂĐŚŵĞŶƚϮWƌĞͲƌŝŐĂďĂŶĚŽŶŵĞŶƚƐĐŚĞŵĂƚŝĐ                       Change to Approved Sundry, Well CRU CD1-33 6DYHG$XJ  Change to Approved Sundry, Well CRU CD1-33 Page 5 of 5 Printed: 4-Aug-22  ƚƚĂĐŚŵĞŶƚϯ^ĞƚƵƉĨŽƌƐŝĚĞƚƌĂĐŬƐĐŚĞŵĂƚŝĐ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y Anne Prysunka at 4:02 pm, Aug 03, 2022 Travis Smith Digitally signed by Travis Smith Date: 2022.08.03 15:35:57 -08'00' ; %DUHIRRW &RPSOHWLRQ '65'/%  ; '/% ; &':  '/%  ; ; 97/   SVL  GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.09.01 13:24:20 -08'00' RBDMS JSB 090722  ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ  WĂŐĞϭ ĂƚĞ͗ ƵŐƵƐƚϮϯ͕ϮϬϮϮ ^ƵďũĞĐƚ͗ ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚKǀĞƌǀŝĞǁ͕ZĞǀ͘ϭ WƌĞƉĂƌĞĚLJ͗dƌĂǀŝƐ^ŵŝƚŚ͕ϲϳϬͲϰϬϭϰ KďũĞĐƚŝǀĞ ϭͲϯϯŝƐĂŶůƉŝŶĞŝŶũĞĐƚŽƌŽƌŝŐŝŶĂůůLJĚƌŝůůĞĚĂŶĚĐŽŵƉůĞƚĞĚŝŶϮϬϬϭ͘dŚĞǁĞůůǁĂƐƌĞĐĞŶƚůLJ ĐŽŶǀĞƌƚĞĚƚŽƉƌŽĚƵĐƚŝŽŶƚŽĚĞͲƉƌĞƐƐƵƌĞƚŚĞůƉŝŶĞŝŶƚĞƌǀĂůĨŽƌĚŝƐƉŽƐĂůǁĞůůĚƌŝůůŝŶŐ͘ϭͲϯϯŚĂƐ ďĞĞŶŝĚĞŶƚŝĨŝĞĚĂƐĂŵŽƚŚĞƌďŽƌĞĚŽŶŽƌĨŽƌĂŶĞǁůƉŝŶĞĚŝƐƉŽƐĂůŝŶũĞĐƚŝŽŶǁĞůů͘dŚŝƐƉƌŽƉŽƐĂů ĚĞƚĂŝůƐƚŚĞƚŚƌŽƵŐŚͲƚƵďŝŶŐĂďĂŶĚŽŶŵĞŶƚŽĨƚŚĞϭͲϯϯůƉŝŶĞŝŶƚ ĞƌǀĂůƚŽƉƌĞƉĂƌĞƚŚĞǁĞůůĨŽƌ ƚŚĞƐŝĚĞƚƌĂĐŬŽƉƉŽƌƚƵŶŝƚLJ͘ WƌŽĐĞĚƵƌĞ ^ůŝĐŬůŝŶĞ ϭ͘WƵůůͲϭŝŶũĞĐƚŝŽŶǀĂůǀĞĨƌŽŵͲŶŝƉƉůĞĂƚϭ͕ϳϮϯ͛D͘ Ϯ͘DĞĂƐƵƌĞ^,WŽĨůƉŝŶĞƌĞƐĞƌǀŽŝƌ͘  ŽŝůĞĚdƵďŝŶŐ ϭ͘^ĞƚĂĐĞŵĞŶƚƌĞƚĂŝŶĞƌũƵƐƚďĞůŽǁƚŚĞĂŬĞƌ^ͲϯƉĂĐŬĞƌ͕ĂƚĂƉƉƌŽdžŝŵĂƚĞůLJϳ͕ϲϮϱ͛D͘ Ϯ͘ŽŶĨŝƌŵŝŶũĞĐƚŝǀŝƚLJƚĞƐƚŽĨŽƉĞŶŚŽůĞƐĞĐƚŝŽŶďLJƉƵŵƉŝŶŐƐĞĂǁĂƚĞƌƚŚƌŽƵŐŚƚŚĞĐĞŵĞŶƚ ƌĞƚĂŝŶĞƌ͘ ϯ͘ďĂŶĚŽŶůƉŝŶĞƌĞƐĞƌǀŽŝƌďLJƉƵŵƉŝŶŐĂƉƉƌŽdžŝŵĂƚĞůLJϭϭϬďďůƐŽĨϭϱ͘ϴƉƉŐůĂƐƐ' ĐĞŵĞŶƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌ͘hŶͲƐƚŝŶŐĨƌŽŵƌĞƚĂŝŶĞƌĂŶĚůĂLJĂƉƉƌŽdžŝŵĂƚĞůLJϭďďůŽĨĐĞŵĞŶƚ ŽŶƌĞƚĂŝŶĞƌ͘  ^ůŝĐŬůŝŶĞͬ&ƵůůďŽƌĞ ϭ͘dĂŐƚŽƉŽĨĐĞŵĞŶƚŝŶϰͲϭͬϮ͟ƚƵďŝŶŐ͘ Ϯ͘WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐƚŽϮ͕ϬϬϬƉƐŝ͘ ϯ͘WƌĞƐƐƵƌĞƚĞƐƚ/ƚŽϮ͕ϬϬϬƉƐŝ͘ ͲůŝŶĞ ϭ͘WƵŶĐŚƚƵďŝŶŐũƵƐƚĂďŽǀĞƚŚĞĂŬĞƌ^ͲϯƉĂĐŬĞƌĂƚϳ͕ϱϵϳ͛D͘ Ϯ͘ŝƌĐƵůĂƚĞƚƵďŝŶŐƚŽ/ƚŚƌŽƵŐŚƚŚĞƚƵďŝŶŐƉƵŶĐŚĞƐƚŽǀĞƌŝĨLJŐŽŽĚĐŽŵŵƵŶŝĐĂƚŝŽŶ͘ &ƵůůďŽƌĞ ϭ͘ZŝŐƵƉƚŽƉƵŵƉĚŽǁŶƚŚĞƚƵďŝŶŐƚĂŬŝŶŐƌĞƚƵƌŶƐĨƌŽŵƚŚĞ/ƚŚƌŽƵ ŐŚƚŚĞƚƵďŝŶŐƉƵŶĐŚ͘ ƐƚĂďůŝƐŚĐŝƌĐƵůĂƚŝŽŶƚŚƌŽƵŐŚƚŚĞƉƵŶĐŚ͕ƚŚĞŶƉƵŵƉϰϱďďůƐŽĨĐ ĞŵĞŶƚĨŽůůŽǁĞĚďLJĂ ĨŽĂŵǁŝƉĞƌďĂůů͘ŝƐƉůĂĐĞƚŽϲ͕ϬϬϬ͛DǁŝƚŚϵϭďďůƐŽĨĚŝƐƉůĂĐĞŵĞŶƚ͘  97/  6WDWH ZLWQHVV WDJ DQG SUHVVXUH WHVW  ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ  WĂŐĞϮ ^ůŝĐŬůŝŶĞͬ&ƵůůďŽƌĞ ϭ͘dĂŐƚŽƉŽĨĐĞŵĞŶƚŝŶϰͲϭͬϮ͟ƚƵďŝŶŐ͘džƉĞĐƚĞĚƚŽƉŽĨĐĞŵĞŶƚŝƐĂƚĂƉƉƌŽdžŝŵĂƚĞůLJϲ͕ϬϬϬ͛ D͘ Ϯ͘WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐƚŽϮ͕ϬϬϬƉƐŝ͘ ϯ͘WƌĞƐƐƵƌĞƚĞƐƚ/ƚŽϮ͕ϬϬϬƉƐŝ͘ ͲůŝŶĞ ϭ͘ƵƚϰͲϭͬϮ͟ƚƵďŝŶŐĂƚΕϰ͕ϰϬϬ͛D͘ 6WDWH ZLWQHVV WDJ DQG SUHVVXUH WHVW 97/  &$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRW FOLFNOLQNVRURSHQDWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHU DQGNQRZWKHFRQWHQW LVVDIH )URP6PLWK7UDYLV7 7R/RHSS9LFWRULD7 2*& &F1DJHO0DWW% 6XEMHFW5(>(;7(51$/@&58&' 37'6XQGU\ 3OXJIRU5HGULOO 'DWH:HGQHVGD\$XJXVW30 $WWDFKPHQWV&'2YHUYLHZ5HYSGI ,ĞůůŽsŝĐƚŽƌŝĂͶ  ^ĞĞƚŚĞĂƚƚĂĐŚĞĚƌĞǀŝƐĞĚKǀĞƌǀŝĞǁWƌŽĐĞĚƵƌĞ͕ĂƐǁĞůůĂƐŵLJĂŶƐǁĞƌƐďĞůŽǁ͘WůĞĂƐĞůĞƚŵĞŬŶŽǁŝĨ LJŽƵŶĞĞĚŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ͊ dƌĂǀŝƐ  &ƌŽŵ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕ƵŐƵƐƚϭϳ͕ϮϬϮϮϭϭ͗ϰϬD dŽ͗^ŵŝƚŚ͕dƌĂǀŝƐdфdƌĂǀŝƐ͘d͘^ŵŝƚŚΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗EĂŐĞů͕DĂƚƚфDĂƚƚ͘͘EĂŐĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗΀ydZE>΁ZhϭͲϯϯ;WdϮϬϬͲϮϭϮ͕^ƵŶĚƌLJϯϮϮͲϰϱϲͿWůƵŐĨŽƌZĞĚƌŝůů  CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. dƌĂǀŝƐ͕  ϭ͘ WůĞĂƐĞƉƌŽǀŝĚĞDW^W Ă͘ >ĂƐƚ^,W;ϴͬϲͬϮϮͿǁĂƐϰϱϰϲƉƐŝĂƚϳϲϯϲ͛D;ϲϵϵϲ͛dsͿ͘hƐŝŶŐĂϬ͘ϭƉƐŝͬĨƚŐƌĂĚŝĞŶƚ͕ ƚŚĞDW^WŝƐϯϴϰϲƉƐŝ͘ Ϯ͘ /ƐĂĐĞŵĞŶƚďŽŶĚůŽŐĂǀĂŝůĂďůĞĨŽƌƚŚĞϳ͍͟,ŽǁǁĂƐƚŚĞdKŽĨϲϳϬϬ͛DĚĞƚĞƌŵŝŶĞĚ͍ Ă͘ dŚĞϲϳϬϬ͛DŝƐďĂƐĞĚŽŶĂǀŽůƵŵĞƚƌŝĐĐĂůĐƵůĂƚŝŽŶŽĨƚŚĞĐĞŵĞŶƚƉƵŵƉĞĚ͘ĂƐĞĚŽŶ ŽƚŚĞƌĂƐƐƵŵƉƚŝŽŶƐĨƌŽŵƐŝŵŝůĂƌǁĞůůƐŽĨƚŚĞĞƌĂ͕/͛ĚůŝŬĞƚŽƵƐĞĂϰϬйĞdžĐĞƐƐĂƐƐƵŵƉƚŝŽŶ ǁŚŝĐŚǁŽƵůĚƉůĂĐĞƚŚĞĞƐƚŝŵĂƚĞĚdKĂƚϳ͕Ϭϯϲ͛D͘>ǁĂƐƌƵŶƚŚƌŽƵŐŚͲƚƵďŝŶŐƚŚĂƚ ƐŚŽǁĞĚŐŽŽĚĐĞŵĞŶƚƚŽƚŚĞƚƵďŝŶŐƚĂŝůĂƚϳ͕ϲϱϯ͛D͘ ϯ͘ >ĂƐƚD/dͲ/ĂŶĚD/dͲd͍ Ă͘ ϲͬϭϰͬϮϭ͕ŶŽŶͲǁŝƚŶĞƐƐĞĚD/d/ƉĂƐƐĞĚƚŽϮ͕ϰϬϬƉƐŝ͘EŽƌĞĐĞŶƚD/ddƐ͘ ϰ͘ WůĞĂƐĞƉƌŽǀŝĚĞĨŽƌŵĂƚŝŽŶƉŝĐŬƐĨŽƌƚŚĞůƉŝŶĞŽŶƚŚĞt^ Ă͘ ϳϲϴϮ͛DŝƐůƉŝŶĞƚŽƉ͘^ĞĞĂƚƚĂĐŚĞĚƐĐŚĞŵĂƚŝĐŝŶƚŚĞKǀĞƌǀŝĞǁ͘ ϱ͘ ĂŶLJŽƵWdĂŶĚƚĂŐĂĨƚĞƌƚŚĞůƉŝŶĞƉůƵŐŝƐƐĞƚƚŚƌŽƵŐŚƌĞƚĂŝŶĞƌĂƚϳϲϮϱ͛D͍dŚŝƐƉůƵŐǁŝůů ŶĞĞĚƚŽďĞǀĞƌŝĨŝĞĚ͘ Ă͘ zĞƐ͕ǁĞĐĂŶďƌĞĂŬƚŚĞĐĞŵĞŶƚŝŶŐŝŶƚŽƚǁŽũŽďƐƚŽƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘dŚŝƐǁŽƌŬĨůŽǁ ŝƐĚĞƚĂŝůĞĚŝŶƚŚĞƌĞǀŝƐĞĚWƌŽĐĞĚƵƌĞKǀĞƌǀŝĞǁĂƚƚĂĐŚĞĚŚĞƌĞ͘ ϲ͘ yEŶŝƉƉůĞĚĞƉƚŚŵŝƐůĂďĞůĞĚŽŶƐĐŚĞŵĂƚŝĐ͘^ŚŽƵůĚďĞϳϲϰϮ͛D͘ Ă͘ dŚĂŶŬLJŽƵ͕ƵƉĚĂƚĞĚ͘   dŚĂŶdž͕ sŝĐƚŽƌŝĂ  Victoria Loepp 6HQLRU3HWUROHXP(QJLQHHU 6WDWHRI$ODVND 2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :WK$YH $QFKRUDJH$.  :RUN    9LFWRULD/RHSS#DODVNDJRY  CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov  ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ  WĂŐĞϯ ϭͲϯϯZĞƐĞƌǀŽŝƌďĂŶĚŽŶŵĞŶƚ  WĂŐĞϰ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«  2' LQ  &DVLQJ'HVFULSWLRQ &21'8&725  ,QVXODWHG 6HW'HSWK IW«  :W/HQ OEIW  *UDGH + 7RS&RQQHFWLRQ :(/'(' ,' LQ  7RS IW.%  6HW'HSWK«  2' LQ  &DVLQJ'HVFULSWLRQ 685)$&( 6HW'HSWK IW«  :W/HQ OEIW  *UDGH - 7RS&RQQHFWLRQ %7&02' ,' LQ  7RS IW.%  6HW'HSWK«  2' LQ  &DVLQJ'HVFULSWLRQ 352'8&7,21 6HW'HSWK IW«  :W/HQ OEIW  *UDGH / 7RS&RQQHFWLRQ %7&0 ,' LQ  7RS IW.%  6HW'HSWK«  2' LQ  &DVLQJ'HVFULSWLRQ 23(1+2/( 6HW'HSWK IW«  :W/HQ OEIW *UDGH 7RS&RQQHFWLRQ ,' LQ /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV &RP 0DNH 0RGHO 1RPLQDO,' LQ    23(1+2/( 7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ 7RS IW.%  6HW'HSWK«  6WULQJ0D«  7XELQJ'HVFULSWLRQ 78%,1* 6HW'HSWK IW.%  :W OEIW  *UDGH / 7RS&RQQHFWLRQ ,%70 ,' LQ  &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ ,WHP'HV 2' 1RPLQDO LQ &RP 0DNH 0RGHO 1RPLQDO ,' LQ +$1*(5 )0&78%,1*+$1*(5 )0&    1,33/(  &$0&2 '% 1,33/( &$0&2 '%  3$&.(5 %$.(563$&.(5 %DNHU 6    1,33/(  +(6 ;1 1,33/( +(6 ;1  :/(*:,5(/,1((175<*8,'( %DNHU  2WKHU,Q+ROH :LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF 7RS IW.% 7RS 79' IW.% 7RS,QFO ƒ 'HV &RP 0DNH 0RGHO 61 ,' LQ    ,1-9$/9( $,QMHFWLRQ9DOYHRQ '%/RFN +66   1RWHV*HQHUDO 6DIHW\ (QG'DWH $QQRWDWLRQ  127(9,(:6&+(0$7,&Z$ODVND6FKHPDWLF &'30 9HUWLFDOVFKHPDWLF DFWXDO 23(1+2/( 352'8&7,21 3$&.(5 685)$&( ,1-9$/9( 1,33/( &21'8&725,QVXODWHG  :16352' .%*UG IW  55'DWH  2WKHU(OHY« &'  7' $FW%WP IW.%  :HOO$WWULEXWHV )LHOG1DPH $/3,1( :HOOERUH$3,8:,  :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO ƒ  0' IW.%  :(//1$0( :(//%25( $QQRWDWLRQ /DVW:2 (QG'DWH+6 SSP 'DWH&RPPHQW 66691,33/( Last Tag Annotation Depth (ftKB)End Date Wellbore Last Mod By Last Tag:CD1-33 lmosbor Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Swap Gauges for Drilling pressure managment & Pulled & replaced A-1 8/13/2021 CD1-33 claytg Casing Strings Casing Description CONDUCTOR Insulated 42" OD (in) 16 ID (in) 15.06 Top (ftKB) 38.0 Set Depth (ftKB) 114.0 Set Depth (TVD)… 114.0 Wt/Len (l… 62.58 Grade H-40 Top Thread WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 36.8 Set Depth (ftKB) 2,376.7 Set Depth (TVD)… 2,375.8 Wt/Len (l… 36.00 Grade J-55 Top Thread BTC-MOD Casing Description PRODUCTION OD (in) 7 ID (in) 6.28 Top (ftKB) 34.5 Set Depth (ftKB) 7,878.3 Set Depth (TVD)… 7,039.5 Wt/Len (l… 26.00 Grade L-80 Top Thread BTCM Casing Description OPEN HOLE OD (in) 6 1/8 ID (in)Top (ftKB) 7,878.3 Set Depth (ftKB) 10,854.0 Set Depth (TVD)… 7,058.8 Wt/Len (l…Grade Top Thread Tubing Strings Tubing Description TUBING String Ma… 4 1/2 ID (in) 3.96 Top (ftKB) 32.3 Set Depth (ft… 7,654.3 Set Depth (TVD) (… 7,001.4 Wt (lb/ft) 12.60 Grade L-80 Top Connection IBTM Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Item Des Com Nominal ID (in) 32.332.30.07HANGER FMC TUBING HANGER 4.500 1,723.4 1,722.4 0.53 NIPPLE CAMCO 'DB' NIPPLE 3.812 7,597.0 6,981.3 66.49 PACKER BAKER S-3 PACKER 3.875 7,642.1 6,997.6 71.16 NIPPLE HES 'XN' NIPPLE 3.725 7,653.0 7,001.0 72.29 WLEG WIRELINE ENTRY GUIDE 3.875 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°)Des Com Run Date ID (in)SN 1,723.4 1,722.5 0.53 INJ VALVE 4.5" A- INJECTION VALVE ON 3.812" DB LOCK 8/13/2021 0.000 HSS-162 7,642.1 6,997.6 71.16 GAUGES 4.5" KEYLESS XN LOCK w/ FLOWTHRU SUB & SPARTEK GAUGES 8/13/2021 0.000 Notes: General & Safety End Date Annotation 5/17/2009 NOTE: VIEW SCHEMATIC w/Alaska Schematic9.0 CD1-33, 8/25/2021 8:28:21 AM Vertical schematic (actual) OPEN HOLE; 7,878.3-10,854.0 PRODUCTION; 34.5-7,878.3 GAUGES; 7,642.1 PACKER; 7,597.0 SURFACE; 36.8-2,376.7 INJ VALVE; 1,723.4 NIPPLE; 1,723.4 CONDUCTOR Insulated 42"; 38.0-114.0 WNS INJ KB-Grd (ft) 42.56 Rig Release Date 1/5/2001 CD1-33 ... TD Act Btm (ftKB) 10,854.0 Well Attributes Field Name ALPINE Wellbore API/UWI 501032035700 Wellbore Status INJ Max Angle & MD Incl (°) 91.47 MD (ftKB) 10,802.99 WELLNAME WELLBORE Annotation Last WO: End DateH2S (ppm)DateComment SSSV: NIPPLE • MEMORANDUM • State of Alaska Alaska Oil and Gas Conservation Commission TO: Jap Regg DATE: Monday,June 19,2017 P.I.Supervisor ' "f 1 /(7 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC CD1-33 FROM: Bob Noble COLVILLE RIV UNIT CDI-33 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry J NON-CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CD1-33 API Well Number 50-103-20357-00-00 Inspector Name: Bob Noble Permit Number: 200-212-0 Inspection Date: 6/10/2017 ✓ Insp Num: mitRCN170612084533 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well CD1-33 Type Inj W TVD 6981 "Tubing 2420 - 2420 " 2420 - 2420 PTD 2002120 Type Test SPT Test psi 1745 - IA 1130 3200 ' 3120 3110 BBL Pumped: 2 -BBL Returned: 1.6 - OA 790 810 810 - 810 " Interval 4YRTST P/F P Notes: Monday,June 19,2017 Page I of 1 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday,October 08,2013 TO: Jim Regg P.I.Supervisor e - I b6,�(15 SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC CDl-33 FROM: Lou Grimaldi COLVILLE RIV UNIT CD1-33 Petroleum Inspector Src: Inspector Reviewed By: P.I.Suprv,c f NON-CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CD1-33 API Well Number 50-103-20357-00-00 Inspector Name: Lou Grimaldi Permit Number: 200-212-0 Inspection Date: 1 0/5/2013 Insp Num: mitLG131005171724 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min PTD 2002120 • TYpe Test; G TVD 6981 IA 2050 zsoo 7 2770 2770 Well CDI 33 Type In' Yp t SPT Test psi 1745 I OA 730 730 . 730 735 3450 3420 3420 3420 j Interval 'WRIST P/F P Tubing Notes: .5 bbl's diesel pumped and returned.Fluid in IA at surface.Good solid test. SCANNED ;) r 2 3Z Tuesday,October 08,2013 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday,June 18,2013 TO: Jim Regg r P.I.Supervisor .(7 t ((Z-1 I l SUBJECT: Mechanical Integrity Tests CONOCOPHILLIPS ALASKA INC CDI-33 FROM: Jeff Turkington COLVILLE RIV UNIT CDI-33 Petroleum Inspector Src: Inspector Reviewed By: P.I.Suprvt= NON-CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CDI-33 API Well Number 50-103-20357-00-00 Inspector Name: Jeff Turkington Permit Number: 200-212-0 Inspection Date: 6/12/2013 Insp Num: mitJAT130614193417 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well CD1-33 'Type Inj N TVD 6981 IA 560 2000 1935 1920 PTD 2002120 Type Test,SPT Test psi 1745 OA 740 • 740 740 740 Interval 4YRTST P/F P Tubing 2620 2620 2825 2825 - Notes: 1.0 bbl diesel to fill. SCANNED FEB 2 6 2014 Tuesday,June 18,2013 Page 1 of 1 • MEMORANDUM To: Jim Regg ~ ~ ~Z P.I. Supervisor ~~ ~ ~t~ 7 FROM: Bob Noble Petroleum Inspector • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, June 22, 2009 SUBJECT: Mechanical Integrity Tests CONOCOPHII.LIPS ALASKA INC CDI-33 COLVII.LE RIV UNIT CDl-33 Src: Inspector NON-CONFIDENTIAL Reviewed By: ~~_ P.I. Suprv , ~ Comm Well Name: COLVILLE RIV iTNIT CD1-33 Insp Num: mitRCN090617155636 Rel Insp Num: API Well Number: 50-103-20357-00-00 Permit Number: 200-212-0 ~ Inspector Name: Bob Noble Inspection Date: 6/13/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Wel~ CDl-33 Type Inj. G "j'~ 6981 jA 1600 3000 2950 2940 P.T.D 2002120 TypeTest SPT Test psi 3000 ,/ QA 775 600 990 790 Interval 4YRTST P~ P / Tubing 3633 3633 3633 3633 Notes: Nli r1 •`tGS+ P,^~~;c~~~ t ~4~~; ;. * [ ~j[`~ ~i ~ l~~. .} ~a~4 rsr~ }- ~ ~ ~ . ., ~... . _ .. Monday, June 22, 2009 Page 1 of 1 . . ~ ConocoPhillips Alaska ,\:J c--'·;.; P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31, 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 5CANI~ED APR 1 0 2007 d.,Ðt.J -~, d- Dear Mr. Maunder: Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of these wells were found to have a void in the conductor by surface casing annulus. The voids that were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered to prevent water nom entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~~C Jerry Dethlefs ConocoPhillips Well Integrity Proj Supervisor Attachment . . ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD# cement pumped cement date inhibitor sealant date ft bbls ft gal CD1-1 199-046 26" 0.3 6" 4/16/2003 3 2/17/2007 CD1-2 200-172 54" 0.6 5" 4/16/2003 2.7 2/17/2007 CD1-3 199-120 9'2" 1.4 14" 4/16/2003 6.5 2/17/2007 CD1-4 200-117 84" 1.0 9" 4/16/2003 4.3 2/17/2007 CD1-5 199-128 56" 0.6 30" 4/16/2003 14 2/17/2007 CD1-6 200-083 4" na 4" na 2 2/17/2007 CD1-8 204-059 6" na 6" na 8 2/17/2007 CD1-9 200-071 6" na 6" na 3 2/16/2007 CDHO 200-171 18" na 18" na 8.5 2/16/2007 CD1-12 204-205 4" na 4" na 2 3/8/2007 CD1-14 201-038 4" na 4" na 1 3/8/2007 CD1-16 199-094 14'7" 2.0 6" 4/16/2003 3 2/16/2007 CD1-17 200-145 8'9" 1.2 8" 4/16/2003 3.5 2/16/2007 CD1-18 204-206 4" na 4" na 1 3/8/2007 CD1-19 200-040 10" na 10" na 3 3/8/2007 CD1-20 204-240 6" na 6" na 2 3/8/2007 CD1-21 201-006 14' 1.8 8" 4/16/2003 3.7 2/16/2007 CD1-22 200-110 25" 0.3 4" 4/16/2003 1 3/8/2007 CD1-23 199-063 15' 2.1 8" 4/16/2003 3.7 2/16/2007 CD1-24 199-026 27" 0.3 6" 4/16/2003 2.8 2/16/2007 CD1-25 200-008 76" 0.8 18" 4/16/2003 8.4 2/16/2007 CD1-26 199-088 6" na 6" na 3 2/19/2007 CD1-27 200-006 16'8" 2.6 4" 4/16/2003 1.8 2/16/2007 CD1-28 200-199 6" na 6" na 3 2/16/2007 CD1-29 200-215 4" na 4" na 1.8 2/16/2007 CD1-30 200-132 9' 1.4 6" 4/16/2003 3 2/16/2007 CD1-31 200-118 6" na 6" na 3 2/19/2007 CD1-32 199-104 8'6" 1.2 5" 4/16/2003 2.3 2/16/2007 CD1-33 200-212 54" 0.6 10" 4/16/2003 4.7 2/16/2007 CD1-34 200-043 38' 5.7 8" 4/16/2003 3.7 2/16/2007 CD1-35 199-038 4" na 4" na 1 3/8/2007 CD1-36 199-112 15'10 2.3 8" 4/16/2003 3.7 2/16/2007 CD1-37 199-067 8" na 8" na 4 2/19/2007 CD1-38 200-003 48" 0.5 4" 4/16/2003 1.5 3/8/2007 CD1-39 199-080 4" na 4" na 1 3/8/2007 CD1-40 199-044 4" na 4" na 1.8 2/16/2007 CD1-41 200-017 12" na 12" na 5.6 2/16/2007 CD1-42 199-119 74" 0.8 6" 4/16/2003 2.8 2/16/2007 CD1-43 200-106 8" na 8" na 3.7 2/16/2007 CD1-44 200-055 10" na 10" na 4.7 2/16/2007 CD1-45 199-101 4" na 4" na 2 2/19/2007 CD1-46 204-024 36" na 36" na 16.9 2/16/2007 Alpine Field March 31,2007 ~.~~;., MICROFilMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc CIJI-- 3 3 ( Annular In¡ection Permit Required Documents: ~ 9-5/8" Casing Detail ~ 9-5/8" Cementing Details rM' Daily Drilling Report from Surface casing cement job , 9-5/8" Initial Casing Shoe Test , 7" Casing Detail ri 7" Cementing Details r$ Daily Drilling Report from Intermediate casing cement job rI Formation Adequacy for Annular Injection Test 5CANNEJ) JAN 1 3 2004 @r-D ~ Ð ,~ ( ( Casing Detail 9 5/8" Surface Casino ( Well: CD1-33 Date: 12/25/00 ( "'PHILLIPS Alaska, Inc. A Subsidiary of PHILLIPS PETROLELM COMPANY DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to LDS 36.80 FMC Gen V Hanger 2.43 36.80 Jts 3 to 55 53 Jts 9-5/811 36# J-55 BTC Csg 2252.20 39.23 Davis Lynch Float Collar 1.56 2291 .43 Jts 1 to 2 2Jts 9-5/811 36# J-55 BTC Csg 81.99 2292.99 Davis Lynch Float Shoe 1.74 2374.98 2376.72 TD 12 1/411 Surface Hole 2386.00 RUN TOTAL 32 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - #12 (On stop rings of Jt #1 & #2) #14,16,18,20,22,24,26,28,30,32,34,36,38, ) 40,42,44,46,48,50,52. . 10 Jts left out #56 - #65 Use Best-a-Life 2000 pipe dope Remarks: Up Wt -147k Dn Wt -145k Block Wt - 70 SupefVisor: David P. Burley " ¡ ( ~PHILLIPS Alaska, Inc. ~ A Subsidiary of PHILLIPS PETROLELM COMPANY (: CASING TALLY WELL NUMBER: TUBING DESCRIPTION: DATE: PAGE: RIG: 1 of 2 Doyon 19 CD1-33 9 5/8", 36# L-80 BTC 12/25/00 ì f Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 8 No Feet No Feet No Feet No Feet No Feet No Feet No Feet No Feet 1 39.02 28 42.54 51 42 44 76 101 12(3 151 H6 ------ - 2 42.97 27 42 99 52 42.94 77 102 127 152 177 3 43.52 28 41.7-6 53 I 42 56 78 103 128 1t>3 178 - 1--- -"--'- ~ -- - --..-. - - ..-- -- - .----- 4 37.83 29 4253 42 !::i4 7~ 104 12& 154 179 -- - -- - r---- - ---- .- -.. 5 42.52 30 42.80 55 ! 43 01 80 105 130 15:) 180 --' ---- I --'---- 6 43.09 31 42.30 55 42.64 81 1061 131 156 181 - - -' 1--:;1'- ----. ------- 7 42.$4 ~~2 43. 15 57 42 21 82 107 132 ~') I 182 .-- -. -- .-=~'-I Úi:i" ----- - u- 8 41.71 33 42 78 58 4~:d~ ~3 IOH 1 ~~:~ 1 ~..:B -- -- -1------_.. .- .- ---.- -- .-- -- --- -- -------- 9 42.23 42.93 I . $~ 59 4~ (;0 84 1091 134 159 184 :~¡¡¡:¡¡~M~9~¡¡~~~¡~¡ -------- - --. _-..n .n --- --- ..-- 10 35 42.02 60 42A8 85 110 135 160 185 11 :¡¡~¡¡¡~¡i~~ii¡¡j~~ 36 i:i¡¡~¡II.~ili¡¡¡¡¡¡:¡¡ 61 ~ 86 111 136 161 186 12 I¡¡¡¡ai~~ij¡¡~¡¡¡¡¡ 37 42.41 62 42-:4ã 87 112 137 162 187 13 43.44 38 j¡¡¡~¡¡¡¡~I~li¡¡¡¡¡¡¡¡~¡ 63 ~ 88 113 138 163 188 14 ¡¡~¡i¡¡M:.g~f~¡¡¡¡¡¡¡¡¡ 39 42.71 64 42-:-7ð 89 114 139 164 189 15 42.82 40 ¡¡j¡¡I\¡I.~~¡¡¡¡¡¡¡¡¡¡ 65 ~ 90 115 140 165 190 16 m¡¡¡IMfiI~¡¡¡ 41 42.70 66 91 116 141 166 191 17 42.90 42 ¡¡j¡¡¡¡¡~¡¡I~ii¡¡¡¡¡¡¡¡¡¡ 67 92 117 142 167 192 18 ¡¡~¡~¡¡:iJ.~ii¡¡¡¡¡¡¡ 43 42_68 68 93 118 143 168 193 19 42.70 44 ¡¡¡¡¡¡¡¡¡¡jl@ii:¡¡¡:¡¡¡: 69 94 119 144 169 194 20 :¡¡¡¡¡~a.i~i~¡¡¡¡¡¡¡¡ 45 42.66 70 95 120 145 170 195 21 42.76 46 ¡¡¡~¡¡}ii~¡II¡I~¡ 71 96 121 146 171 196 22 ~¡~¡¡¡~¡jig~li¡¡¡¡¡¡¡ 47 42.92 72 97 122 147 172 197 23 42.98 48 ¡¡¡¡i¡~¡¡¡¡I~ii::¡¡¡¡¡¡i¡ 73 98 123 148 173 198 24 ¡¡¡¡i¡¡¡¡~}¡~i:~i¡:¡¡¡¡i 49 42.33 74 99 124 149 174 199 25 41.14 50 i¡i¡¡¡¡¡i¡¡iJ~¡i¡}¡¡¡1i 75 100 125 150 175 200 Tot 1057.11 Tot 1063.19 Tot Tot Tot Tot 632.29 Tot Tot TOTAL LENGTH THIS PAGE = 2752.59 DIRECTIONS: TOTAL JOINTS THIS PAGE = 65 FLOAT SHOE 1.74 FLOAT COLLAR 1.56 HANGER 2.43 RKB 36.15 ( ( Phillips Alaska Drilling Cementing Details Well Name: CD1-33 Report Date: 12/25/2000 Report Number: 3 Rig Name: Doyon 19 AFC No.: 998C18 Field: Alpine Casing Size Hole Diameter: Angle thru KRU: Shoe Depth: LC Depth: % washout: 9.518 12.1/4 2377' 2291' Centralizers State type used. intervals covered and spacing Comments: 12.1/4" X 9.518" Bowsprlng centralizers 1 per Joint on #'s 1-12, (over stop rings on Jts. if. 1 & 2) over collars every other Joint from 32 Total Jts. #14 thru 52. Mud Weight: PV(prior cond): PV(after cond): YP(prior cond): YP(after cond): Comments: 9.8 15 14 40 15 Gels before: Gels after: Total Volume Circulated: 45/55/631 4/29/36 732 BBLS Wash 0 Type: Volume: Weight: Comments: 40 bbls 9.6 PPG Marker wI nutplug Spacer 0 Type: Volume: Weight: Comments: ARCO B45 50 BBlS 10.5 PPG lead Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield: Comments: AS III lW 70 365 10.7 PPG 4.44 Additives: 30% D053. 0.6% D046. 1.5% D079, 1.5% SO01. 50% D124, 9% BWOW DO44 Tall Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield: Comments: G 70 232 15.8 PPG 1.17 Additives: 0.2% D046. 0.3% D065. 1% SO01 Displaêement 0 Rate(before tail at shoe): Rate(tall around shoe): Str. WI. Up: Comments: 10 BPM 10 BPM 147 Reciprocation length: Reciprocation speed: Str. WI. Down: 25 20 FPM 143 Theoretical Displacement: Actual Displacement: Str. WI. In mud: 177.1 BBlS 177 BBlS Calculated top of cement: CP: Bumped plug: Floats held: Returns to Surface Date:12/25/00 YES YES Tlme:1442 hrs. Remarks:Clrculated and conditioned mud at 9.5 BPM @ 520 psi, reciprocated casing untllliast 40 BBlS of displacement. Full returns while circulating and cementing, had 57 bbls of 10.7 PPG cement returns to surface. Cement Company: Rig Contractor: IApproved By: Dowell DOYON I David P. Burley ,( ( .~ Phillips Alaska Drilling Daily Drilling Report AFC No. Date RptNo Rig Accept - hrs Days Since AccepUEst: 2.4 / 2.3 Rig Retase - hrs: 998C18 12/2512000 3 12/231200001:30:00 PM Well: CD1.33 Depth (MDfTVD) 2386/2385 Prey Depth MD: 2386 Progress: 0 Contractor. DOYON Daily Cost $ 334900 Cum Cost $ 569642 Est Cost To Date $ 540000 Rig Name: Doyon 19 Last Csg: 9-5/8" @ 2377' Next Csg: 7" @ 7874' Shoe Test: Operation At 0600: Changing brake band on drawworks. Upcoming Operations: MU BHA #2 and PU 5" drill pIpe. Test casIng, clean out cement, LOT, change over, drill ahead. : MUD DATA DRILLING DATA BIT DATA EH&S DRILLS/BOP DATA MUD TYPE De:PTH BIT NO. BIT NO. ACCIDENT (nen-splll) LAST BOP.DIVERT LAST BOP/DRILL LSND 1 N TST 12/1712000 12/23/2000 WEIGHT ROT WT SIZE SIZE EMPLOYER LAST H2S DRILL LAST FIRE DRILL 9.6ppg 12.25 12/1412000 VISCOSITY PUWT MAKE MAKE SPILL LAST CONFINED LAST SPILL DRILL 48sqc HTC N SPACE 12/14/2000 12/05/2000 PVIYP SOWT TYPE TYPE TYPE . " ;>i ..,.;~ 5/14 MXC1 .. ... .::. .:;. c"..;' "'," GELS AVG DRAG SERIAL NO SERIAL NO VOLUME (gallons) FUEL USED 3821 6/10/12 L98DJ APIWL MAX DRAG DEPTH OUT DEPTH OUT LAST SAFETY MTG DRILL WATER USED 700 8.2 10125/2000 - BBLS HTHP WL TRO BTM DEPTH IN DEPTH IN ,. ' POTABLE WATER 95 ml130 min 116 INJECtiON USED - BBLS SOLIDS TRO OFF FOOTAGE FOOTAGE INJECTION WELL . . WEATHER&.'. 6.0% 2270 CD1-44 . PERSONNEL DATA HOLE VOLUME PUMP PRES ADT/AST ADT/AST SOURCE WELL TEMP of .10 146bbl III 13.75/4.38 / CD1.33 MBT PUMP NO WOB2 WOB2 RATE (bpm) WIND SPEED 2 12.5 11211 20-30 - 3.5 ph LINER SZ RPM 1 RPM 1 PRESSURE (psi) WIND DIRECTION 70. 10 5.51611 90 - 245 - 1200 LGS SPM 1 TFA TFA INJECTION FLUIDS CHILL FACTOR of .10.00 2.7% III .547 Water Base Muds 1502 PIT VOL GPM2 JETS JETS Cement PHILLIPS 1 300 III 1011211211811 IIIII 57 PERSONNEL Other 241 DAILY MUD SPS 1 BIT COST BIT COST Diesel CONTRACTOR 26 $4491 III 20 PERSONNEL 0 TOTAL MUD SPP 1 DULL DULL TOTAL VOL (bbl) MISC PERSONNEL 5 $17290 III 2141WTIA III 1820 COMPANY MUDWT GRADE GRADE TOT FOR WELL (bbl) SERVICE 13 MI III E III ER 1 TD III 18058 PERSONNEL TOTAL 45 ~BI;ff.:ÐE$QRIR:rIQN, ,.,¡,:.~,..:~..:::,: c': I BIT/M1C@1.4/XO/NMPONY/NMSTAB/MWD/UBHO/2 NMDC/NMSTAB/NMDCIXO/3 HWDP/JARS/26 HWDP . ,::, \:i~::,..i~'.' ::,~,:.:';;::~.(,::':'.~';ii\,~:';'.,'.:::~,'~::.:,':{':/..:;,..),:,»::,' .":.",DRll,L;pl.p"~QjD.TA?fX<,t\:.)i:?':"t:::.:;.t..';;¡,>'.:,~, ... :.:'>:,.';':',::::),'i.',;:<:::,:.:';i»:':.' BHA NO 1 00,. . ,ID. WEIGHT GRAD~ C;ONNEC,TION .. CLASS 2 , LENGTH BHA LENGTH 1078.78 5 4.281 19.5 G.105 4.1/2 IF DATE LAST INSPECTED: HOURS ON JARS: 131.4 \):'TltilJE:~ ì"h'~:¿~EN[)<.. 'J .:' . .HOURS ". ..: OPS CODE I. , Ho.LE SECT JPHASE.OPS . I ..';.:';:, ,'~,:. ..;/;Qf!E;8ATIQN~FROM OOQO.':.OQOO.... .. .. 12:00 AM 12:30 AM 0.50 CIRC SURF Making Hole Monitor well, static, pump dry job. 12:30 AM 03:00 AM 2.50 TRIP_OUT SURF Making Hole POH, monitor well at hwdp. standback hwdp. 03:00 AM 05:00 AM 2.00 BHA SURF Making Hole LD BHA#1, clear tools from floor. 05:00 AM 11:00 AM 6.00 RUN_CSG SURF Casing and RU to run casing, PJSM. Ran 55 Jts. of 9.5/8" casing. MU Cementing hanger and landing Joint. 11:00 AM 01 :00 PM 2.00 CIRC SURF Casing and Stage pumps up to 9.5 BPM. final pressure 520 psI. PJSM. Cementing 01 :00 PM 03:00 PM 2.00 CLN_OUT SURF Casing and Test lines to 2500 psi, pumped 40 bbls of 9.6 ppg spacer Cementing with nutplug for marker and 50 bbls of 10.5 ppg spacer. Cemented casing with 365 sxs of lead and 232 sxs of tall slurry. Displaced with 20 bbls FW and 157 bbls of mud, plugs bumped, CIP @ 1442 hrs, had 57 bbls of 10.7 ppg cement returns at surface. Flush and blow down surface lines. 03:00 PM 04:30 PM 1.50 OTHER SURF Casing and LD cement head and LJ, MU wash tool and flush Dlvertor Cementing and riser. 04:30 PM 08:30 PM 4.00 NU_ND SURF Casing and ND Dlvertor system, Install Unl.Head and test M/M seal s to Cementing 1000 psi for 10 min. 08:30 PM 10:30 PM 2.00 NU_ND SURF Casing and NU bope. Cementing 10:30 PM 12:00 AM 1.50 BOPE SURF Casing and RU and begin testing BOP's and choke manifold 250/3500 Cementing psI. John Spaulding (AOGCC) waived witnessing test. Daily Drilling Report: CD1-33 12/25/2000 Page 1 CASING; Well Name: )T and FORMATION INTEGRITY TEST --- CD1-33 12/26/00 Supervisor. D. Burley: Date: Reason(s) for test: 0 Initial Casing Shoe Test 0 Formation Adequacy for Annular Injection 0 Deep Test: Open Hole Adequacy for Higher Mud Weight Casing Size and Description: 95/8" 36# J-55 BTC CSG Casing Setting Depth: Hole Depth: 2,406' TMD 2,405' TVD 2,377' TMD 2,376' TVD Mud Weight: 9.6 ppg 29' Length of Open Hole Section: EMW= = Leak-off Press. + Mud Weight 0.052 x TVD 760 psi 0.052 x 2,376' + 9.6 ppg EMW for open hole section = 15.8 ppg Used cement unit Ria DumD used Pump output = 0.0997 bps 3,000 psi 2,800 psi 2,600 psi 2,400 psi 2,200 psi 2,000 psi 1,800 psi w ~ 1,600 psi CI) ~ 1 400 psi t:t: ' Q. 1,200 psi 1,000 psi 800 psi 600 psi 400 psi 200 psi 0 psi NO #2 Fluid Pumped = 1.1 bbls Fluid Bled Back = 0.9 bbls - .-... u ~LEAK-OFF TEST ""-CASING TEST --- LOT SHUT IN TIME -:t;- CASING TEST SHUT IN TIME -+- TIME UNE 0 10 30 STROKES 20 40 50 NOTE: STROKES TURN TO MINUTES DVRING "SHUT IN TIME":see time line above Modified by Scott Reynolds LEAK-OFF DATA MINUTES FOR 60 LOT STROKES PRESSURE ¡- --------- - -,--- - -- -- -- -_OJ ----- --_Of : : 0 I 0 psi: - --- -- ------ -- - -t----- --- - - ---+ --------- t I I 1.0 I 0 psi: ;------------ - - -t ---- -------- -1----- ------ f I I 2.0 I 50 psi: :---- ---- ----1---- --- --- ---- -1- ----- - -- --- - -- f ; I 3.0 I 190 psi: :- -- - --- -------~-- -- -- - - - ---- + - - ---- - ----~ ! ! 4.0 ! 300 psi! .. -- - --- ------- --,------- - - -----.,------ -- -------, ! ¡ 5.0 ! 390 psi ¡ .. - - - -- - -- --- ---.,----------- ---..--------- --- - --, ! ! 6.0 ! 490 psi! .. - - - - - - - - -- - ----.,-------- ---..- ------- --- -- - ~ ! ! 7.0 ! 560 psi! .. - --- ---- ---- ---., ------- ..------------- -- -. ! ! 8.0 ! 630 psi! I- - - - ----- - - -----.. - ----------------- - ------ ---. i ! 9.0 i 680 psi! 1----- - - - --- -----..- --- --- ----------- -----& ! ! 10.0 i 720 psi! 1--- --- -- --- --- - -.. ------ -- ------....------- ---_& , , I . , : : 11.0 : 760 pSI: '----------------"---------------.L.---------------_& , , , , , , , , , , , , ----------------i---------------+----------------t , . , , , , , , :--------------i---------------- -----------------t I I , , I , I , :---------------~---------------I------ ---- -------f , , I , , , , , ----------------~----------------I-----------------f , , , , , , , I , I , , ...-------------.,---------------..-----------------, I , , , , I , , , , , I ..- -- - -- - -------,--- - - -- - --- - --..-- --- - -- - - - -- ----, , I , , , I I , , I , , ..---------------..--------------..-----------------' I , I , , , , I , I , , ..---------------+-----------------------------. , I , , , , , , , , I , ..--------------..-- --- --------..------------- - --. I , I , , , , I , I , , 1----------------""--------------""----------------& , , , I , , , I , , , , '---------------...1- - - - - - - - - - - -I- - - - - - - - - - - . -, , , , , , , , , 1 , , , I I . : SHUT IN TIME I SHUT IN PRESSURE -- - - --- - --- --- -- i-- --- - - - - - ---- -,- ---- - -- -- ----- T : 0.0 min : : 760 psi: ---------------~---------------- -----------------f : 1.0 min : : 710 psi: :----------------~----------------I-----------------f : 2.0 min : : 660 psi: ----------------~----------------I-----------------f 1 30 " I 630 . I ; . mln I : pSI: .. ----- ---- --- --.,- --- - - - ----- -- -..--- --- -- - - -- - ---, i 4.0 min ¡ ¡ 600 psi ¡ ..---------.,---------------..---------- -------, ! 5.0 min ! ! 580 psi! ..------.,---------------..----------------. ! 6.0 min ! ! 560 psi! ..-- - --------.. ---- ---- -- - --... -- ---- --- ---- --. '70" '550.' : .mln: : pSI: 1------ ----- - -..-- -- ------ - - -------- ----+ '80" '540 I' : . mln : I ps: t--------- --..- - ---------- ---....---- - -- ---+ '90" '530" : . mln : : pSI: 1----- --- ---- - -"-- - - - - --- - -- -....--- ------ --- --_& ! 10.0 min ! ! 520 psi! '---------------_..I_-------------_.J.._-------------~ 8 ' " PHilliPS Alas«'a, Inc. œ A Slbsidiary of PHILLIPS PETROlEL.t.1 COMPANY CASING TEST DATA MINUTES FOR CSG TEST STROKES PRESSURE ¡---------------i---------------i-----------------¡ : : 0 stks: 0 psi: ----------------t---------------t----------------1 !----------------¡--_¥..!S_~~!_--¡----~J.!~---~ ~---------------¡---~_!5_~~!---¡--_¥.~~_P.!51_--i : I 6 stks I 520 psi I ----------------~----- ----------~---------------I : : 8 stks : 830 Psi: ----------------~--------------~-----------------I i ! 10 stks i 1 ,030 psi! ,.---------------.---------------.,----------------., ! ! 13 stks i 1,310 psi ¡ r---------------I---1!i-¡¡i-a(¡;--I--1-:!i1()-ittŠi-l~~ ..- - ---- -- - - -- - --of - --- ---- ---. --- --- - -- - ---- -. ! ! 17 stks ! 1,740 psi, 1----------------+-------------"----------------+ L- --- - ---- - - - - - L~ -~-~~ _J. - ~ -'-~~~ p. !!j i ! 21 stks ¡ 2,230 psi! 1------ --- ------_&_------------_&_------ ---------' I , , . , I : 23 stks : 2,510 pSI: '------------ ---- &_------------_¿_-- ----- ---------' , , , I , , , I . , I I ------ ----- --- --I ------- ----- ---t- -- ------ -- - ----1 I I , 1 , I , I :------ --- -------t ------- --- -- ---t- --------,. --- -- - 1 , , , , , I , 1 ------ --- -- -----t------- ----- - -- f- - - - -- -- -- --- ----I , , , I , , , I -- - -- -- - - ---- ---~------------- --~- - -- -- --- ---- ----I , , I , , , I 1 , I I 1 .. ----- -------- --.,---- --- -- --- ---,------ ---- ------., 1 , , , , , 1 1 , , 1 1 ..- --- -----------. ------- --------.,--- --------- ----., I I , I , , , , , 1 , I ,.-- -------------., ------------ ---.----------------... I , , I I 1 , I , I , , , , I SHUT IN TIME: SHUT IN PRESSURE r-õ~ö -m lñ - -- r - - -- - ---- ---- r- 2~Š- i õ -P- 51--! 1------ -- -- -- - - -- + - - -- --- - --- - --- + ---- - - -- - - -- ----... , " '00 I' : 1.0 mln : : 2,5 ps: 1..--------------"--------------- &_-- --------------' '20" '2500" : . mln : :, pSI: ,----------------¿--------------_&_----------------' '30" '2500" : . mln : :, PSI"-c'- ------- ----- ---t--- - -----------t --------------- : 4.0 min : I 2,490 psi ----------------f ----------- -- --t----------------"1 I 5.0 min : : 2,490 psi: :---------------f------------ - --t- -- --- ---- -------1 ! 6.0 min ; : 2,490 psi: ,..---------- -- ---~--------------- f-----------------I ¡ 7.0 min ¡ ¡ 2,490 psi! .. ---------------., ---------------.,----------------., i 8.0 min ! i 2,480 psi ¡ ,.---------------.,---------------.,----------------., ! 9.0 min ! i 2,480 psi! ..---------------.,---------------.,----------------... ! 10.0min ! ! 2,480 psi ! 0----------------.---------------.----------------'" , 150 . , I 2480 ., : . minI :, pSI: 1---------------+---------------+-----------------0 i 20.0 min i ! 2,470 psi! 1----------------"------------ ---+----------------... , 2 ., '4 0 i I I 5.0 mln I I 2, 7 ps : I..-------------~--------------_&_----------------' ! 30.0 min ! ! 2,460 psi! ,--------------_¿_--------______4____-------------' NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY . ( ~PHILLIPS Alaska, Inc. ~ A Subsidiary of PHILLIPS PETROLEUM COMPANY .1 '¡ Jt Number Num of Jts Jts 3 to 192 190 Jts Jts 1 to 2 2 Jts - ì - Casing Detail 7" Intermediate Casing ,c , \ Well: CD1-33 Date: 12/30/00 COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH Doyon 19 AKB to LDS FMC 1111 X 7" Hanger 7" 26# L-80 BTCM Csg 7" Davis Lynch Float Collar 7" 26# L-80 BTCM Csg 7" Davis Lynch Float Shoe 34.45 2.05 7757.10 1.50 81.50 1.70 TO 8 1/2" hole Top of Alpine @ 7790 ' MD. 1 straight blade centralizer per it. #1 - # 16 27 spiral centralizer (1) every other jt #137 - #189 Total - 43 centralizers . See.l. 0lJLrr'\ 0 O"Y\.. tÌ.n \If\l1' Do.O.nl'"<r~ 'It 0\ q FoVnd ~ ~ \\ FS ~ ~(.~hll ^ rl ~ \1~J.ed $ ~ r e Æ"11rl~ '-' J-o 1 þj,.~<'l ' Use Best-a-Life 2000 pipe dope Remarks: Up Wt -250 k On Wt -200 k Supervisor: David P. Burley DEPTH TOPS 34.45 36.50 7793.60 7795.1 0 7876.60 7878.30 7888.00 ( ~PHILLIPS Alaska, Inc. ~ A SUbsidiary of PHILLIPS PETROLEUvI COMPANY \ WELL NUMBER: TUBING DESCRIPTION: DATE: CD1-33 7", 26# L-80 BTCM 12/30/00 PAGE: RIG: ( 1 of 2 Doyon 19 CASING TALLY Column 1 No Feet 1 40 62 ' 2 40.88 3 40.19 4 39.46 5 35 09 6 37.00 7 41 78 8 41 79 9 39.48 10 38.03 11 40.91 12 41.74 13 41 28 14 41 .70 15 41 37 16 41 76 17 .4208 18 4226 19 41.70 41.63 20 21 41.72 41.81 22 23 24 41.51 4181 25 .11 [¡.:; Tot 1019.10 Tot Column 2 No Feet 26 27 28 29 30 31 41.27 41 68 41 56 4154 41 ~2 41.53 4150 41 66 TOTAL LENGTH THIS PAGE = 32 33 34 35 36 41.53 4154 41 75 41.53 .11 78 Column 3 No Feet 51 52 5~~ 54 41 60 41.38 41.65 41 28 4167 4166 Column 4 No Feet 76 41 89 77 3961 78 41.72 79 41 70 80 40.49 81 4 1 35 82 40 7';. 83 4 1 78 84 4 1 79 . -,- ,~ 41 15 1028.99 Tot 1018.77 Tot Column 5 No Feet 101 3853 41 68 40 11 Column 6 No 126 121 128 Feet 40.21 3935 3870 Column 7 No Feet 151 41,92 152 40.11 153 49.54 154 40.55 155 40.09 156 4oJ.69 157 158 39.93 43.03 40.58 Column 8 No 176 177 178 Feet 41 81 41.71 4::: 41. 4074 37 38 39 40 111.68 41 b2 55 56 57 42.25 85 4 1. 5ö 102 103 10~ 4001 4060 129 130 40.12 4011 3701 40 12 159 160 161 42.12 4::1.73 179 180 181 182 183 184 4j 47 39.'12 ~J 7C 4Œ 14 ,..~. ,..^ .:.:: ¿b 41 42 41.80 4 1 :~H 58 I, 1 79 85 3984 38.17 105 106 40 16 131 132 133 134 135 4 1 8<3 43.26 3823 162 42.14 41.21 185 186 37(;7 1..1 1 ~ ~t :'~4 43 4101 '"'C~ ...... 41.51 41.66 4173 87 88 I1Q 11 107 39.6:] 135 3982 163 1~ì4 ,'", ",'.' , ..,:-: I ~':' 187 188 1B9 ..... C') .::: ... t- .c 1 ßf.) . 44 45 40.38 40.90 60 51 62 ~1.78 89 3::': A:j IOU .10 if. 137 4'~ '17 1fif: 3::1 51 190 ~1 ?ï 4ß 41. ßoG 63 3957 90 41 ." I 40 m~ Wi) 38 15 40 15 131:) 41 5{J 40, 1\) 166 41.67 41.63 191 1..:. 16 47 48 41 4,3 41 3J 64 ¿;17H 91 92 42.22 40 1? 110 111 37.98 1 ~,4 14e ,...c '~'" ".,. 1-'..1 167 1ßö 41.67 192 1:1 4G 4[; 4~ B:¿ ~;5 41 70 93 94 41 ßl ~ 12 1,0 i3 14 ~ 142 40.W 41 55 1G9 41. ï'9 , 40.'37 193 4;¿.: o~ C".r. ~.w I¡ 1 ß6 un 111.71 41.69 95 96 40.68 41 7f: 1 1 ::: 40 ~:9 14S 42 5;' 170 171 41.24 194 ,~~-1 Ü 1037.80 Tot 67 Hé) 3~ 55 97 4':) 23 ~ 14 3/8b 144 39.1~ 172. 35.51 195 1..1... -+0 5B 38.53 98 4.:' 1 t: 115 116 4 1 ~~ ~:I 4051 145 146 41 OS 4098 39,2i 1'73 1ï"11 45.6~5 4C.22 4~ .51 196 H?ì '198 199 2.JG 81 2 .60 DIRECTIONS: TOT AL JOINTS THIS PAGE = 195 FLOAT SHOE 1.7 FLOAT COLLAR 1.5 HANGER 2.55 RKB 34.45 Joints 193 thru 195 stay out. (3 left in shed) Shaded cells indicate positive standoff centralizer placement. 70 71 41.57 3917 7t.~ ¿; 1.79 ...,... ; ,') 3 D 30 ",'" ,- 41.52 7961.84 ::10 ..... "C -.- ~¡ .. . ~: :.: iC'] ..:: 1 t: 117 41.35 11 F. 119 3~: 6? 391ô 120 121 38.87 4061 122 4[' ?! 12~~ 4.J m: ... . !,'::. ; .. ,..,., "" c...". 1 ;~:,,' :~~) 11 1000.10 Tot . II-' "'t'l ~4B ~o ï~~ í.19 '~O "if.. .-.. : ~r.} .128.\ 1009.79 Tot 175 1034.69 Tot (' ( Phlr AI k D lr c f D t 1 I IpS as a rl Ing ernen Ing e al S Well Name: CD1-33 Report Date: 12/3112000 Report Number. 9 Rio Name: Doyon 19 þ,FC No.: 998C18 Reid: Alølne Casing Size Hole Diameter. Angle thru KRU: Shoe Depth: LC Depth: % washout: 7" 8.5" 7878 7794 Centralizers State type used, intervals covered and spacing Comments: 1 Straight blade centralizer on Joints "s 1-16 and 1 spiral centralizer on every other Joint "s 137-189. 43 total Mud Weight: PV(prior con d): PV(after cond): YP(prior cond): YP(after cond): Comments: 9.7 PPG 13 14 21 17 Gels before: Gets after. Total Volume Circulated: 12115117 8110/12 720 BBlS Wash 0 Type: Volume: Weight:, Comments: ARCO Wash 20 BBlS 8.4 PPG Spacer 0 Type: Volume: Weight: Comments: ARCO 845 50 BBlS 12.5 PPG Lead Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield: Comments: Additives: Tall Cement 0 Type: Mix wtr temp: No. of Sacks: Weight: Yield: Comments: G 70 130 15.8 1.15 Additives: 0.2% D046, 0.25% D065, 0.25% D800 and 0.18% D167. Displacement 0 Rate(before tail at shoe): Rate(tail around shoe): Str. WI. Up: Comments: 7.5 BPM 8BPM 250 Reciprocation length: Reciprocation speed: Str. WI. Down: 30' 25 FPM 200 Theoretical Displacement: Actual Displacement: Str. WI. in mud: 298.4 BBLS 296.2 BBlS Calculated top of cement: CP: Bumped plug: Floats held: 7290' WI 40"10 excess In open hole Date:12/31/oo YES YES Tlme:0426 hrs Remarks:Clrculated and conditioned mud @ 7.5 bpm final pressure 870 psi. Reciprocated pipe untllliast 15 bbls of displacement, full returns throughout. Cement Company: Rig Contractor: Approved By: Dowell DOYON David P. Burley ( ( Phillips' Alaska Drilling Daily Drilling Report \ I AFC No. I Date Apt No I Rig Ac:c8pt . hIS Days Sln08 AcoeptlEat 8.4 I U 988C18 12/31/2000 9 12J23J2000 01 :30:00 PM Rig Rei... - hIS: Well: CD1-83 Depth (t.fD/'TVD) 78&817040 Prev Depth t.fD: 788ð PIog IUS: 0 Contrador: DOYON Daily Coat $ 277042 Cum Ooat $1558709 Est Cost To Dale $ 1655474 Rill Name: Down 19 Lasl Csg: .,. 0 7818' Next C8Q: Nt A Shoe Test Operatio~ AI 0600: Tn"" _1110 to 3SOO pal. Upc:omin" Operations: Clean ovI ceme~1. AT. chan"e OV8r \g Flo-Pro mud and drill produdion hole. MUD DATA DRlWNG DATA 8fT )ATA EH&S ORiLlSI8OP DATA MUD~ DI!P'TH elT NO. elT NO. ACOIDI!NT (non-spill) LAST eoP/DIVel'lT ~T LAST eol-/DRILL LSNO " N 1 2/3112000 12/2812000 WEIGHT ROTWT SIZE SIZE EMPLO'r'ER LAST HZS DRILL LAST FIRE DRILL 8.8ÞPQ 6.125 12/27/2000 VISCOSITY PUWT MAKE MAKE SALL LAST CONFINED SPACE LAST SPILL DRILL 46sqc STC N 12I0512OOO 12/2912000 fNf'(f!1 sowr TYÆ TYÆ TYÆ FUel. WATER 10 (19 M20SPX GELS Ava DRAG SERIAL NO SERIAL NO VOLUME (gallens) FUEL USED 4111 8(10113 JS3898 API WI. MAXOflAG DEPTH OUT DEPTH OUT LAST SAFETY t.fTG DRILL WATER USED. 500 4.0 1013112000 BBLS HTHPWL TRQ BTM DEPTH IN DEPTH IN POTABLE WATER USED. 90 12mlf3O mln 788ð INJEC1l0N BBLS SOUDS TRQ OFF FOOTAGE FOOTAGE INJECTION WELL WEATHER. 7.5% 0 CD1-44 PERSONNel DATA HOLE VOLUME PUMP PRES ADT/AST ADT/AST SOURCE WELL TEMP 'F .16 298bbl III I ( CD1~ MBT PUMP NO WOB2 WOB2 flATE (bpm) WIND SPEED 14 20 11211 . . 3.5 ph UNERSZ RPM1 RPM1 PRESSURE (psi) WIND DIRECTlON 40' 8.5 5.51811 ' . 1300 LCS SPM1 TFA TFA INJECT10N FLUIDS CHILL FACTOR 'F -50.61 4.1% III 0.690 Weier &sø Muds 1200 PIT VOL GPM2 JETS JETS Other PHILUPS PERSONNEL 1 III 1511511511511 11111 80 120 Diesel 50 DAJLYMUD SPS1 BIT COST BIT COST CONTRACTOR 21 30140130140 0 PERSONNEL $26501 0 TOTAL MUD SPP1 DULL DULL TOTAL VOL (bbl) MISC PERSONNEL 5 III III III 1330 $114164 COMPANY MUDWT GRADE GRADE TOT FOR WELL (bbl) SERVICE PERSONNEL 13 hi' III III III U~\19 TOTAL 46 BHA DESCRIPTION I glT{!1U;TAQI"'1XO1.2INt.CGTAQlNUPONYn.AWDlPWMN~DP/1 I-IWDP/JARIõI4 .IWD ;1 ORilLPlPE DATA ¡w.. NO 4 OD 10 WEIGHT GRADE OONNEO'nON OI..ASS 2 LENGTH BHA LENGTH 383.38 5 4.281 19.5 0.105 4-112 IF DATE LAST INSPECTED: HOURS ON JARS: 11ME I . END I HOURS OPS CODE I HOlE$ECT .1 PHASE OPS I OPERATIONS FROM 0000 . 0000 12:00AM 12:30 AM 0.50 RUN_CSG P1 Casing and Cementing Run 7" casing. MU LJ and establish clrc. 12:30 AM 01:45 AM 1.25 ClRC P1 Casing and Cementing Stage pumps up 10 1.5 bpm and condition mud. 01:45AM 02:15 AM 0.50 OTHER P1 CasIng and Cementing Lay down fill-up tool and MU cement head. 02:15AM 02:45 AM 0.50 ClRC P1 Casing and Cementing Continue circulating hole clean. PJSM. 02:45 AM 0iI:3O AM 1.75 Ct.fT - CSG P1 Casing and Cementing Test lines \g 3400 psi. pump 20 bbls of wash and 50 bbls of 12.5 ppg spacer. Cemented casing wi1h 130 sxs of tail slurry. dilpla.ced wi1h 20 bbls PW and 275.6 bbls of mud. Plugs bumped. floa.ts held. ClP@ 0426 hrs. 0iI:3O AM 06:30 AM 2.00 OTHER P1 Casing and Cementing AD cement head. LO landing joint and remove running tools from floor. 06:90 AM 07:80 AM 1.00 TEST P1 Casing and Cemenllng Pull wear sleeve. instaJl and test packoff 10 5000 psi. 10 min. 07:30 AM 10:00 AM 2.50 BOPE P1 Casing and Cementing Change lop pipe rams 10 3-112" ( 6" and change 11> saver sub \g 3-112" IF. 10:00 AM 04:00 PM 6.00 BOPE P1 Cuing and Cementing Test BOPE " choke and surfac:e safety valves 10 250( 3500 psI. Lay down le91 plug and Install wear bushing. 04:00 PM 0&:00 PM 2.00 BHA PROD Making Hole MU B . A 14. 06:00 PM 12:00 AM 6.00 TRIP_IN PROD Making Hole RIH picking up 3-112" drill pipe from sheef. 24.00 Supervisor: DAVID P. BURLEY Daily Drilling Report: CD1-33 12/31/2000 Page 1 CASING -¡, T and FORMATION INTEGRITY TEST Well Name: CD1-33 Date: 12/31/00 Supervisor: D. Burley Reason(s) for test: 0 Initial Casing Shoe Test 0 Formation Adequacy for Annular Injection 0 Deep Test: Open Hole Adequacy for Higher Mud Weight Casing Setting Depth: Casing Size and Description: 95/8" 36# J-55 BTC X 7" 26# L-80 BTMC Hole Depth: TOC 7,290' TMD 6,798' TVD 2,377' TMD 2,376' TVD Mud Weight: 9.7 ppg Length of Open Hole Section: + 9.7 ppg 4,913' Leak-off Press. + Mud Weight = 820 psi 0.052xTVD 0.052 x 2,376' EMW for open hole section @9 EMW= Pump output = bbls pumped Ai UJOOpsi 900 psi 800 psi 700 psi 6CO psi w D:: => 500 psi In In W D:: D.. 400 psi 300 psi 200 psi 100 psi 5 10 BARRELS Fluid Pumped = 11.5 bbls Fluid Bled Back = 0.0 bbls TIMELlNE;.;..:.:... ONE',Mïf:'Juie JiëKS:. . ~ LEAK-OFF TEST ~CASING TEST --- LOT SHUT IN TIME ~ CASING TEST SHUT IN TIME -+- TIME LINE "'"1"-~ 15 20 NOTE: STROKES TURN TO MINUTES DURING IISHUT IN TIME":see time line above Modified by Scott Reynolds LEAK-OFF DATA MINUTES FOR LOT BBLS PRESSURE r----- -- - -----ï- - - --- ---- ----¡- ---- - -- - - -: - - ---j I I 0 : 0 pSI: '- -- --- -- ------ - .1-- -- --- - -- - --.L.- -- -- ----- -- -- --.I , , 1 . I : I 0.5 : 15 pSI I ;- --- -- --- - -- - ---i --- - ----- - - ----+ - - - -- --- - -- - -- - -t : I 1.0 : 30 psi: ;-- - - - -- - - - - - --- - i --- ------ - -----i-- --- - ------ - -- - - f : I 1.5 I 85 psi I :----------------~--------------~-----------------f : : 2.0 I 197 psi I I-------------~---------------I-----------------f ! ! 2.5 ! 295 psi! r-------------,---------------""----------------' ! ! 3.0 ! 419 psi! r- ------ -- - - -- --,-- ---- ---.,..-- - - -- --- - ----- -. ! i 3.5 i 510 psi i .... - --- - - ---- - ---.. --------- -- - -...-- -- -- ----- -- -- -. ! ! 4.0 i 601 psi ¡ .... -- - -- - - - -- --.. ------- ---- - - of- ------------- - - -. ! ! 4.5 ! 686 psi! 1------ ----- - --<t-- ---- --- --- -....---- -- ---- ---- -.I 1 1 5 0 '177 . , : :.: pSI: to ------ - -- - - -- .1-- ---- - ----- -....----------- -.I 1 1 5 '"IÞ't . 1 : :.5 I 0,,0 pSI: L. -- - -- -- -- -----' - --- - -- -- ---- - -.L. -- -- - - -- --------.1 , , 1 . I : : 6.0 : 750 pSI: '----------------.l--------------.L.------------.I , , 1 . , I : 6.5 : 700 pSI I ;- - --- - -- - ----i - -- - -- - --- --+---- ---- - t : : 7.0 I 670 psi: :--- - -- --- - -- - ---~ --- - - - - ---- - -~-- ------- f : : 7.5 I 590 psi: :--- ------ - ----~-- --- - -----~--- ------ - f : I 8.0 : 586 psi: :-- - - ----- - -- --- -.f-- --- - - ------1------------- f ¡ ! 8.5 ! 591 psi ¡ r - - - -- - - - - - ----, - -- -- -- - ----,--------- -- ----- -, ! ! 9.0 ¡ 576 psi! r - -- - - --- -----,---- ----------.,..----- ----------, : : 9.5 : 565 Psi: , 1 , 1 r --- - -- - - -- ----,------....- ------------. ! ! 10.0 ! 560 psi! r - -- - - - - - --- --..------- - -~ ---- ---- - - ----. ! ! 10.5 ! 540 psi ¡ .. - -- --- - - - ------ --- ------ --- --....- -- - ---- -- - - ----. ! ! 11.0 ! :540 psi! L.---------------"-------------. - - - - - - - - - - --, ! ! 11.5 ¡ 545 psi! ----------- 25 , I : SHUT IN TIME: SHUT IN PRESSURE '------------.1 -- - --- - -- - - - -- -- - ------ ----- , 0 0 . I , 545 . , I . mln : : pSI: ¡-------;- ---1--- --- - - - - -- - -1---- ----:--1 , 1.0 mln , 1 343 PSI, ;-- ------------ i - -- --- - -- -- -- ~- - ----- - -- --of : 2.0 min : : 328 psi: :-------------~----------------I---------------4 : 3.0 min I : 315 psi: :------- ----- ~-- - - -- - - - -- - - - -I- - -- - -- ---- ----- f ! 4.0 min ¡ ! 303 psi! .----- - -- --- ---, -- -- - - -- -- -- - - -.,.. -- - ---- ---- - -- --, ! 5.0 min i i 293 psi ¡ r- ----------- ---.. -- - - - -- - - - --- --.,..- - -- -- ----- -- - -. '60" '283" : .mln: : pSI: r------------"---------------""---------------. '70" '270" : .mln: : pSI: r---- ---- - --- ---.. -- - - - -- --- - - - -of----- --------- - - -. '80" '258" : .mlnl : pSI: to--------------"-------- -------+ ---------------. '90" '247" I .mlnl : pSI: 1---------------"---------------""----------------' ! 10.0 min i ! 242 psi ¡ L. ---------------..---------- -----....---- ------------.1 fa . " PHilliPS AlaSl\á, Inc. A Slbsldia1y of PHILLIPS PETROLELM COMPANY CASING TEST DATA MINUTES FOR CSG TEST STROKES PRESSURE ¡---------------¡--------------¡-----------------¡ : I 0 stks: 0 psi : '----------------.1-- - -- -- ------ --..---- ----- -------.1 1 , , , 1 , , , , , , :--------------- -t----- -- - -- -----t -------- ---- ----1 1 I I I , 1 I I :- -------------- - t--- -- ----------t------ --- ----- - --I , I , , 1 I , 1--------- ---- --- t---- ----------- t--- --- - -- --- -----I , 1 , I , 1 1 , I---------------t---------------t-----------------I , 1 , , , 1 I 1 , 1 , , ...---- -----------.,-- -------------,--------------- -., , 1 , 1 , 1 , 1 , 1 , , ,..- --------------.,------ ---------.,----- ---- ---- ---., : : : -- , , 1 r----------------"---- -- ---------.---- ----- ----_. , 1 I , , , I , I r-------------- --+--- ----- ----- --+------------- ---of I I , , , , I , , 1 I , t----------------+- --- ----- ------+----------------of I 1 1 I , 1 1 , , I 1 '---------------- +--- ------------+---------------- of 1 , 1 , , I 1 , , , 1 , '-------------- -- .1--------------_£ --------- ------_.& 1 , 1 , 1 , 1 , 1 I 1 , 1..---------------" ----- ----------..-------- -- ------.1 1 I , I , , , , , 1 , I :----------------t---------------t----------------1 1 1 , , , , , 1 :----------------t---------------t----------------1 , , , 1 I , , I----------------t------------ -- -t----- ----- -------1 1 , , , 1 I 1 , I---------------t-------------- -t- --- -- -----------1 1 I I 1 1 , I , I , I , r- --------------.,---------------., ----------------., 1 , 1 , 1 I 1 , 1 , 1 , r--------------,---------------'----------------" , , 1 , 1 , I 1 , , , , , , I SHUT IN TIME I SHUT IN PRESSURE r-- ---- ----- - ----+ --- ---- - -- - ----.. - -- -- - ----- -- -- --, , 00 ., 1 0 . I : . mln : : pSI: t- ---------------+--- ------- ----+----------------of ! 1.0 min ! ! ! L.---------------+--- --- - - -- -----+-------- -- ------... ! 2.0min ! ! ! L.---------------.I---------------+----------------'" ! 3.0 min ! ¡--"" '- ----------- ----..---- --- -------_.&_---------- --. ¡ 4.0min ! i :----------------t---- -----------t----------- -----1 : 5.0min : : : :------------- ---t------ ---------t------ ----- - -- ---I : 6.0min : : : 1------------- - - -t - ---------- ----t----------- ---- --I : 7.0min : : : I----------------t---------------t-----------------I ! 8.0min ! ! i ,..---------------,---------------,----------- -- ---., ¡ 9.0min ! ! ! ,..---------------,---------------.,----------- -- ---., ¡ 10.0 min ¡ ! ! r--------------+ --- ------------, ---------- - -- -- -., ¡ 15.0 min ! ¡ ¡ r----------------+---------------+----------------of ! 20.0 min ¡ ¡ ¡ t-- --------------+----- ----- -- -- - .--- -- ------ -- - -- of ¡ 25.0 min ¡ ¡ ! '---------------- +------------ ---+ ----------- -- - --... ! 30.0 min ¡ ! ! L.------- - --- - ---.1- -- - --- - - - -- ---.I - - - -- - - - -- - - -- - _.& NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY Permit to Drill 2002120 MD 10854 ~ TVD DATA SUBMITTAL COMPLIANCE REPORT 1116/2003 Well Name/No. COLVILLE RIV UNIT CDI-33 Operator CONOCOPHILLIPS ALASKA INC 7059 ... Completion Dat 1/5/2001 /" Completion Statu WAGIN Current Status WAGIN APl No. 50-103-20357-00-00 UIC Y ~ REQUIRED INFORMATION Mud Log N__.~o Sample N._.~o Directional Survey ~_~..~___:~__ .: .... DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Lo ~ Injection Profile Lo _CC~,C,,esing collar Iocator Lo ~-~'~"l'~Perature Lo ~ma Ray Lo L L C R L L R Log Log Run Name Scale Media No (data taken from Logs Portion of Master Well Data Maint Interval Start Stop OH I Dataset CH Received Number Comments MD Array Res TVD Array Res 9931 Directional Survey CBL Injection Profile Directional Survey 1 Blu 1 Blu 1 Blu 1 Blu 1 2/5 2/5 Blu 1 7750 9900 1 7750 9900 1 7750 9900 I 7750 9900 2.~10854 1 7750 9900 FI NAL 2386 10854 FI NAL 2388 10854 FINAL 2386 10854 FINAL FINAL 7420 7720 FINAL 7800 7920 FINAL Case 6/21/2002 Case 6/21/2002 Case 6/21/2002 Case 6/21/2002 Open 2/26/2001 Case 6/21/2002 oh 2/26/2001 oh 2/26/2001 oh 2/26/2001 2/22/2001 ch 3/16/2001 ch 6/1/2001 oh 9/24/2001 09931 2386-10854 2386-10854 BL, Sepia 2386-10854 BL, Sepia 2386-10854 Digital Data Dir Survey Paper Copy 7420-7720 Color Print 7800-7920 BL, Sepia Directional Survey Well Cores/Samples Information: Name Start Interval Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y/~ Chips Received? ~ Analysis Y.J-N.--.- R ~.r~.iv~.rl? Daily History Received? Formation Tops Permit to Drill 2002120 MD 10854 TVD DATA SUBMITTAL COMPLIANCE REPORT 1/1612003 Well Name/No. COLVILLE RIV UNIT CD1-33 Operator CONOCOPHILLIPS ALASKA INC 7059 Completion Dat 1/5/2001 Completion Statu WAGIN Current Status WAGIN APl No. 50-103-20357-00-00 UIC Y Comments: Compliance Reviewed By: Date: O6/12/O2 Schlumberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2154 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine Color Well Job # Log Description Date BL Sepia Prints CD CD1-33 ~l~l-~l,;). ;INJECTION SURVEY 05/16/02 1 CD1-40 [ ~ c~--O'./cl :FLOWING TEMP/PRESS SURVEY 05/19/02 1 CD1-45 JcICj.../O~ INJECTION SURVEY-WARMBACKS 05/19/02 I RECEIVED ~('~ DATE: ,, ,~,, r~ ~ r)t~"~O SIGNED: I ,,JL.;i"4 /._ !, /...gu'- Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907)561 Schlumberger Schlumberger Technology Corporation, by and through is Geoquest' Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1t74 Company:- Alaska Oil & Gas Cons Comm Attn: Lisa Weepie .333 west 7th Ave, Suite t00 Anchorage, AK 99501 Field: -AlPine (Open Hole) Color Well Job # Log Description Date BL Sepia Prints CD CD1-33 INJECTION PROFILE 05/1310t t 1 CD1-14 21225 USIT 0412710t 1 . . . . . · "' .-. ~, ~./ .^~: JUN 0 1 2001 Aladm 0il & Gas Cons. CmmTdseion Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 661-8317, Tha~l~l~8 5/3012001 Scklumberger Schlumberger Technology Corporation, by and through is Geoquest Division ' 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1076 . .Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine (Cased Hole) _. Color Well Job # Log Description Date BL Sepia Prints CD CD1-02~Db-1"T=.~ 21103 SCMT 02/07101 I - CD1-33~0~i1,,~ 21104 SCMT 02/08101 1 CD1-26 IC~..D~'~ 21116 RST WATERFLOW LOG 03/03/01 I 1 WD-02 21117 TEMP BASELINE & WARMBACK ' 03101/01 1- 1 WD-02 21117 RST WATERFLOW LOG 03102/01 I 1 WD-02 21117 INJECTION PROFILE/RST 03102/01 ' I 1 I V 3/14/01 NadmOil&GasC0ns.~ Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907)561-83!7. Than~ - PHILLIPS Alaska, Inc. A Subsidiary of PHILLIPS PETROLEUM COMPANY Post Office Box 100360 Anchorage, Alaska 99510-0360 G. Alvord Phone (907) 265-6120 Fax: (907) 265-6224 March 2, 2001 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Subject: Completion Report for CD1-33 (200-212) Dear Mr. Commissioner: Phillips Alaska, Inc. submits the attached Completion Report for the drilling operations on the Alpine well CD 1-33. If you have any questions regarding this matter, please contact me at 265-6120 or Scott Reynolds at 265-6253. Sincerely, G. C. Alvord Alpine Drilling Team Leader PA1 Drilling GCA/skad RECEIVED MAP, 06 2.001 Alaska 0ii & Gas Cons. Commission ~0h0tag0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil D Gas [~ Suspended [~ Abandoned D service [~ WAG injector 2. Name of Operator ..... ~ ;'-'*=, 7. Permit Number Phillips Alaska, Inc. ! LOCATIC~4.,S v[~_~, _~'~ 200-212 3. Address_~U. ~--.~ 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 ..... 50-103-20357-00 4. Location of well at surface ~ 9. Unit or Lease Name 452' FNL, 2349' FWL, Sec. 5, T11 N, R5E, UM (ASP: 385774, 5975679) - -...-- Colville River Unit At Top Producing Interval , .... _.. 10. Well Number 1947' FNL, 1049' FWL, Sec. 5, T11 N, R5E, UM (ASP: 384454, 5974203) ' _.j'_...5.--_..~j_ CD1-33 At Total Depth :' '.';-.;":r" - ' " 11. Field and Pool 682' FSL, 2475' FWL, Sec. 5, T11 N, RSE, UM (ASP: 885846, 5971484) ; ..... ~,~.~_ ...... " Colville River Field 5. Elevation in feet (indicate KB, DF, etc.) is. Lease Designation and Serial No. ' ........................... ~ Alpine Oil Pool RKB 87 feetJ ADL 25559 / ALK 872095 12. Date Spudded 18. Date T.D. Reached 14. Date Comp., Susp. Or Aband. J15. Water Depth, if offshore 18. No. of Completions December 23, 2000 January 3, 2001 January 5, 2001 J N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey ~20. Depth where SSSV set 21. Thickness of Permafrost 10854' MD / 7059' TVD 10854' MD / 7059' TVD YES r~ No DI N/A feetUD 1557' 22. Type Electric or Other Logs Run GR/Res 23. CASING, LINER AND CEMENTING RECORD SEYI-ING DEPTH MD J CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 16" 62.5# H-40 Surface 114' 42" lO cu yds Portland Type 3 9.625" 36# J-55 Surface 2377' 12.25" 365 sx AS III LW & 232 sx Class G 7" 26# L-80 Surface 7878' 8.5" 13o sx Class G 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4.5" 7653' 7597' Open Hole completion 6.125" OH from 7888'-10854' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27. PRODUCTION TEST Jr""'r'~J [',) t J~' ~ I~.! J[ I~ Date First Production Method of Operation (Flowing, gas lift, etc.) ~'J J \ J ~J ~ J ~ J~ L N/A Injector Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF tNATER-BBL OIL GRAVITY - APl (corr) press, psi 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. .,^ RECEIVED MAR 0 6 2001 Alaska 0ii & Gas Cons. Commission Anchorage · Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. ~.. 30. ~- GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Alpine D 7763' 7027' Alpine 7798' 7034' N/A 31. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Scott Reynolds 265-6253 Signed ~ "~., {~ Title Alpine Dri inR Team Leader Date -~/~-(O { ~/ ~ G. C. Alvord Prepared by Sharon AIIsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL)or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Operations Summary CD1-33 Rpt No Comments 12/23/00 Move out Ball Mill and split Rig modules. Move rig from well CD1-28 to CD133. Move in Pits and Motors, spot GIS. 12/23/00 Nu Divertor system, take on mud in pits. Accepted rig @ 13:30 hours. 12/23/00 Ready floor for BHA, service TD and drawworks, take on mud in pits. 1 2/23/00 12/23/00 1 2/23/00 12/23/00 1 2/23/00 12/24/00 1 2/24/00 1 2/24/00 12/24/00 1 2/25/00 1 2/25/00 12/25/00 1 2/25/00 12/25/00 12/25/00 12/25/00 12/25/00 12/25/00 12/25/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 12/26/00 1 2/27/00 12/27/00 MU BHA #1. Held Pre-Spud Meeting with Rig Team. Performed Divertor Test, John Crisp (AOGCC) waived witnessing test. Fill Conductor and pressure test mud lines and standpipe to 2500 psi. Drill from 116' to 300', surveying with Gyro. ART=0.85 AST=0.79 Drill from 300' to 2386'. ART=9.37 ASR=4.38 Pump sweep around and circ clean, monitor well. Wipe hole to 1459', max overpull 35k. RIH, no problems. Circ and condition mud. Monitor well, static, pump dry job. POH, monitor well at hwdp, standback hwdp. LD BHA #1, clear tools from floor. RU to run casing. PJSM. Ran 55 jts. of 9-5/8" casing. MU hanger and landing joint. Stage pumps up to 9.5 BPM, final pressure 520 psi. PJSM. Test lines to 2500 psi, pumped 40 bbls of 9.6 ppg spacer with nutplug for marker and 50 bbls of 10.5 ppg spacer. Cemented casing with 365 sxs of lead and 232 sxs of tail slurry. Displaced with 20 bbls FW and 157 bbls of mud, plugs bumped, CIP @ 1442 hrs, LD cement head and LJ, MU wash tool and flush Divertor and riser. ND Divertor system, install Uni-Head and test M/M seal s to 1000 psi for 10 min. NU bope. RU and begin testing BOP's and choke manifold 250/3500 psi. John Spaulding (AOGCC) waived witnessing test. Test BOPE, choke manifold and surface safety valves 250/3500 psi, annular 250/2500 psi. Install wear bushing. Slip and cut drilling line. Change out off-drillers side brake band on drawworks. Service drawworks and top drive. MU BHA #2, shallow test tools. PU 30 Jts of DP and RIH to 2266'. Wash down from 2266' to 2277', circ out cement contaminated mud, Blow down TD. RU and test 9-5/8" casing to 2500 psi for 30 min.' Drill out cement and float equipment - made 20' of new hole to 2406'. Circ hole clean. RU and perform LOT - established 15.8 ppg EMW. Displaced hole with new 9.6 ppg LSND mud. Drill from 2406' to 3215'. ART=4.1 AST=0 Drill from 3215' to 4783'. ART=4.94 AST=2.56 Pump high vis sweep and circ hole clean. Monitor well, static. 12/27/00 Wiped hole to shoe, no problems. RIH, precautionary wash last 90' to bottom. 12/27/00 Drill from 4783' to 6020'. ART=5.16 AST--1.35 12/28/00 Drill from 6020' to 6945'. ART=5.18 AST=0.67 Operations Summary CD1-33 ~. 12/28/00 Pumped high vis sweep and circ hole clean. Monitor well, static, blow dn. TD. 12/28/00 POH, no problems. Monitor well @ shoe & hwdp, static. 12/28/00 Standback hwdp and DC's, laid down tools. MU BHA #3, shallow test @ 1070'. 12/28/00 RIH, no problems, precautionary wash down last 90'. 12/28/00 Drill from 6945' to 7138'. ART=0.6 AST=2.6 12/29/00 Drill from 7138' to 7888'. ART=3.6 AST=10.2 12/29/00 Pump high/Iow/high vis sweeps and circ hole clean. 12/29/00 Pump out to 7630', continue POH to 6779', no problems. RIH, precautionary wash last 60' to bottom. 12/29/00 12/30/00 1 2/30/00 12/30/00 1 2/30/00 12/30/00 12/30/00 12/30/00 12/30/00 12/30/00 12/30/00 12/30/00 12/30/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 12/31/00 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 Pump high vis sweep, circ and cond mud. Circ and cond mud, monitor well, static. Pump out to 7443', POH. Monitor well at shoe and hwdp, no problems. Set back hwdp, lay down BHA, clear tools from floor. Pull long wear bushing, flush wellhead and BOP stack with wash tool, install wear sleeve. RU to run 7" casing, held PJSM with crew. Run casing to 2350', cup on fill-up tool failed. Lay down fill tool and blow down TD, RU circ swedge and hose. Circ and cond mud, repaired Fill-up tool. RD circ equipment - MU fill-up tool. PJSM w/crew. Run 7" casing to 5546'. CBU @5 BPM , 450 PSI. R E C E IV E D Run 7" casing. Run 7" casing, MU LJ and establish circ. Stage pumps up to 7.5 bpm and condition mud. MAR 0 6 Z001 Lay down fill-up tool and MU cement head. Continue circulating hole clean, PJSM. Alaska 0il & l]as Cons. Commission Aj~ch0rag.e . Test lines to 3400 psi, pump 20 bbls of wash and 50 bbls of 12.5 ppg spacer. L;ememeo casing with 130 sxs of tail slurry, displaced with 20 bbls FW and 275.6 bbls of mud. Plugs bumped, floats held, CIP @ 0426 hrs. RD cement head, LD landing joint and remove running tools from floor. Pull wear sleeve, install and test packoff to 5000 psi, 10 min. Change top pipe rams to 3-1/2" x 6" and change TD saver sub to 3-1/2" IF. Test BOPE - choke and surface safety valves to 250/3500 psi. Lay down test plug and install wear bushing. MU BHA #4. RIH picking up 3-1/2" drill pipe from shed. RIH picking up drill pipe to 6649'. Slip and cut drilling line, service drawworks and top Drive. RIH to 7656'. Clean out cement stringers from 7656' to 7708', and med hard cement from 7708' to 7779'. Circ and condition mud. RU and test casing to 3500 psi for 30 min. Blow down lines and RD circ head. Drill out float equipment, cement and 20' of new hole to 7908'. Found FC and FS 14' high, adjusted shoe depth to 7864'. Circ and condition mud. RU and perform LOT - established EMW of 11.9 ppg. Blow down lines and RD circ head. Operations Summary CD1-33 {'-" 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/1/01 1/2/01 1/3/01 1/3/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/4/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 1/5/01 PJSM. Change well over to 9.2 ppg FIo-Pro mud - clean possum belly and shaker pans. Attemp to survey - unable. Troubleshoot MWD Pump out 5 stands and POH. Handle BHA - change out MWD. MU BHA #5 and shallow test tools. RIH to 7886' - establish circ and survey. Drill from 7908' to 7978'. ART=0.8 AST=0 Drill from 7978' to 9382'. ART=12.5 AST=4.1 Drill 6 1/8" hole f/9382' to 10854'-7058 TVD Circ Iow/high vis sweeps - circ and condition prep for change over Continue circ Iow/hi vis sweeps - circ & clean pit 6 & trip tank - Take on 9.2 ppg brine - mix hi vis spacer Cahnge well over to 9.2 ppg brine - 4.5 bbls/m @ 1690 psi Monitor well - hole taking 108 bbls/hr - spot 40 bbls hi vis pill @ 10854' Pull out to 9572' - hole taking 30 bbls/hr. Spot 40 bbls hi vis pill @ 9572' Continue pull out to 7861'(into 7" csg) monitor well - hole taking < 10bbls/hr Pump dry job - blow down top drive Continue pull out std back 45 stds 3 1/2" DP - L/D 201 jts. 3 1/2" DP Flush BHA w/40 bbls flesh water - blow down TD L/D 6 1/8" BHA Pull wear bushing Rig up to run 4 1/2" completion PJSM - M/U WLEG -Pup it.- XN nipple - 1 jt. tbg - Baker S-3 packer -(3) 4 1/2" pups jts - RIH w/4 1/2" 12.6# L-80 IBTM tbg - Ran 138 jts.- Install Camco DB nipple - RIH w/40 jts. 4 1/2" 12.6# L-80 IBTM tbg - M/U FMC tbg hanger M/U tbg hanger - land tbg - Test tbg hanger seals to 5000 psi - WLEG @ 7654 - Packer @ 7597 Rig down tongs - clean rig floor Change upper pipe rams to41/2" x 7" - change SS in TD - N/D BOPE - N/U Tree - test to 5000 psi - pull 2 way ck Rig up circ manifold and lines for displacement PJSM - Displace well w/105 bbls 9.6 ppg Inhab. brine followed by 153 bbls diesel @ 2.5 bbl/min @ 1100 psi N/U short lubicator to tree - drop RHC packer setting ball & rod - attempt to pressure up to set packer - ball didn't seat into RHC profile R/U slick Iline- PJSM - Test wireline BOP to 3500 psi RIH w/blind box on slick line to attempt to push ball & rod to RHC profile - observed slight bobble @ 7450' - ran on in to top of XN nipple - pressure up to 1000 psi - appears ball seated into RCH profile - POOH w/slick line & tools into wireline lubica Pressure up on tbg to set packer w/3500 psi & hold for 30 mins. lost 230 psi in 30 mins - switch line & test 4 1/2 x 7 annulus to 3500 psi for 30 mins. ok - Pressure test witnessed and approved by Lou Grimaldi AOGCC Bleed off lines - rig down slick line - rig down circ manifold R/U lubicator & set BVP- Secure well - release rig RECEIVED MAR 06 2001 Alaska 0ii & Gas Cons, Commissl0n Anchorage - -~:_::: ;..::? :..-i .?~!'AtgPINE:-'"f-{:' CD 1~q3'-': :'i-~- '~; ..... ('-"---'-'~:-: :'Alaska State:'Plan&~i'-'-.-"-t; :' i ~- :' '..: --J:. -'." ~: _~'-:':; ~_::r~.VSect:.. Pl~'n~:'~ 2 :;:"' ;-:i ;"';~: ~,~'~d''-': ~:;'~'~i~,:~.i.;':';1;.'.,~i~'~i::('fvi~-~e:.~:'!;i -rg~.J [.'i-.'.?:~: xi ~;i-;.[~::. :-':-:i-::-" Yi=;i~-.--'-..--) !: ~ N :~ ,~i'~' ii':~i 51 5195.00 33.83 235.37 5050.52 4994.52 385280.86 5975313.98 -372.40 -487.24 1.78 52 5386,00 33.46 234,99 5209,52 5153,52 385193,06 5975254.92 -432,82 -574,11 0.22 53 5480.01 33.57 236.09 5287,91 5231.91 385149,82 5975226,22 -462,19 -616,91 0.66 54 5672.00 33,41 235,02 5448,02 5392.02 385061.54 5975167,68 -522,11 -704,27 0.32 55 5862,00 32,98 235,11 5607.02 5551,02 384975.35 5975109,45 -581,67 -789,55 0,23 56 5958,00 32,47 234,94 5687,78 5631,78 384932,37 5975080.37 -611.42 -832.08 0.54 57 6051,00 31,77 237,48 5766.55 5710.55 384890.87 5975053,51 -638.93 -873.16 1,64 58 6243.00 31.39 235.42 5930.12 5874,12 384806.24 5974999.27 -694,48 -956.95 0.60 59 6432.00 31.54 236,01 6091.33 6035,33 384723,88 5974944.97 -750,05 -1038,46 0,18 60 6624 31.8 236.39 6254.74 6198,74 384639,26 5974890,21 -806,13 -1122,23 0,17 61 6718 31,92 237,62 6334,58 6278,58 384597.23 5974863,85 -833,15 -1163,84 0,7 62 6814 31,42 236,88' 6416.28 6360,28 384554.42 5974837,25 -860,41 -1206,23 0,66 63 6882 31,55 237,62 6474,27 6418,27 384524,26 5974818,5 -879,62 -1236,1 0,6 64 6906 32,11 237,8 6494,66 6438.66 384513,46 5974811,91 -886,38 -1246.8 2,37 65 6937 32,09 238,93 6520,92 6464,92 384499,3 5974803,49 -895,02 -1260,83 1,94 66 6968 32,49 234,01 6547,13 6491,13 384485,37 5974794,56 -904,17 -1274,62 8,57 67 7001 33,85 230,83 6574,76 6518,76 384470.9 5974783,77 -915,18 -1288,92 6,69 68 7035 35,6 225,83 6602,7 6546.7 384456,26 5974771,12 -928,06 -1303,36 9,83 69 7061,99 36,96 223,05 6624,46 6568,46 384444,91 5974759,89 -939,47 -1314,54 7,91 70 7094 38,27 219,12 6649,82 6593,82 384431,86 5974745,37 -954,19 -1327.36 8.54 71 7123 39,27 215,16 6672,44 6616,44 384420.68 5974731,07 -968.67 -1338,32 9,22 72 7158 40,38 209,4. 6699.32 6643.32 384408,44 5974712,32 -987,61 -1350.26 11 73 7189 41.09 203,85 6722.82 6666,82 384399,11 5974694.39 -1005.68 -1359.32 11.9 74 7224 41,46 199,47 6749.13 6693,13 384390,27 5974673,08 -1027,13 -1367,83 8,32 75 7256 42,14 194.7 6772,99 6716,99 384383,69 5974652,8 -1047,5 -1374,09 '10,16 76 7283,02 43,05 191,42 6792,89 6736,89 384379,29 5974635,06 -1065,31 -1378,21 8,88 77 7319 44,81 186,76 6818,8 6762,8 384374,98 5974610,49 -1089,95 -1382,14 10,23 78 7351 46,13 182,66 6841,25 6785,25 384372,77 5974587,8 -1112.68 -1384 10,02 79 7383 47,52 177,56 6863,15 6807,15 384372,37 5974564.48 -1136 -1384,04 12,41 80 7415 49.71 174,24 6884,31 6828,31 384373,73 5974540,52 -1159,94 -1382,31 10.36 81 7446 52,16 172,29 6903,85 6847,85 384376,18 5974516,58 -1183,84 -1379,48 9,29 82 7478 54,72 171,27 6922,91 6866,91 384379,47 5974491,09 -1209,27 -1375,8 8,4 83 7510' 57,95 169,82 6940,64 6884,64 384383,44 5974464,77 -1235,54 -1371,42 10,77 84 7541 60,73 168,54 6956.45 6900,45 384388,04 5974438,5 -1261,73 -1366,41 9,65 85 7572 63,99 167,05 6970,83 6914,83 384393,43 5974411,58 -1288,5.6 -1360.6 11.35 86 7604 67,19 165,33 6984,05 6928,05 384399.95 5974383.19 -1316.85 -1353,64 11,13 87 7635 70,43 163.77 6995,26 6939,26 384407.22 5974355,22 -1344.71 -1345.94 11.46 88 7667 73,73 162.71 7005.1 6949,1 384415.54 5974325.94 -1373,85 -1337,16 10,78 89 7698 76,09 161.64 7013.17 6957,17 384424,26 5974297,32 -1402,35 -1327,99 8,31 90 7731 76,96 162,86 7020,86 6964,86 384433,57 5974266,61 -1432,91 -1318,21 4,46 91 7759 79,11 160,61 7026,67 6970,67 384441.75 5974240,47 -1458.92 -1309,63 10,99 92 7792,01 81,95 158,77 7032,1 6976,1 384452,57 5974209,77 -1489,45 -1298,32 10,21 93 7820 84,57 158,27 7035,38 6979,38 384462,34 5974183,75 -1515,31 -1288,15 9,53 94 7888 87 154 7040,38 6984,38 384488,81 5974121,34 -1577,31 -1260,71 7,21 95 >>>Projected to TD 96 97 98 99 100 : :" .'-~' t:":': ': !:' · _ .~ .. :-.:.- -... · ve~:'-s~ -.-.._:.;_~-?:.:: 594.80 696.18 745.82 847.10 946.82 996.58 1043.68 1139.33 1233.57 1329.62 1376.67 1424.4 1458.04 1469.99 1485.49 1501.23 1518.75 1537.82 1553,71 1573.22 1591.36 1613.62 1633.4 1655.48 1675.32 1691.83 1713.55 1732.49 1750.75 1768.41 1785.34 1802.95 1820.78 1838.15 1855,52 1873.32 1890.32 1907.66 1924.24 1942.06 1957.06 1973.91 1987.81 2019.23 ': ::-' .: :.---~'-.:' :.ALPINE-'_'--?CD1-3~: ~:?.~ :' ::-: ':~ ': '. Alaska state Plane: :.!:::. · :- .:-" -':' ::: ": - .-.:::.¥.$ect'~ plan· ~.~15i~85:.:'.:.::-~':;..' $.vy#!:: De~t.h':'. :i~.': :' d~9..:.':!:.:.:!::.'.':deg:.~:i.!:.-:':-! :.:~t:::':..-"?-:!'.:subsea:::: .-"~ ~: .ff..=:-: :': i :.....:_.'! ftli.' ~.:_'._'-" :_ ft. =-:_':.': 101 8403.00 89.79 152.69 7043.46 6987.46 384720.58 5973661.55 -2033.48 -1021.80 102 8498.00 89.97 152.40 7043.66 6987.66 384763.06 5973576.58 -2117.78 -978.00 103 8593.00 88.94 152.32 7044.57 6988.57 384805.81 5973491.76 -2201.94 -933.93 104 8685.00 89.69 151.16 7045.67 6989.67 384848.10 5973410.08 -2282.96 -890.37 105 8779.00 90.17 151.46 7045.78 6989.78 384891.94 5973326.93 -2365.42 -845.25 106 8870.00 90.62 153.91 7045.15 6989.15 384932.42 5973245.45 -2446.27 -803.49 107 8964.00 89.01 151.47 7045.46 6989.46 384974.24 5973161.29 -2529.78 -760.37 108 9056.00 89.97 152.61 7046.28 6990.28 385016.10 5973079.38 -2611.04 -717,24 109 9149.00 87.77 154.56 7048.11 6992.11 385056.16 5972995.49 -2694.30 -675.88 110 9240.00 87.70 151.73 7051.71 6995.71 385095.96 5972913.75 -2775.41 -634.81 111 9331.00 88.11 154.21 7055.04 6999.04 385136.01 5972832.13 -2856.41 -593.48 112 9425.00 88.32 153.90 7057.96 7001.96 385175.80 5972747.02 -2940.90 -552.38 113 9517.00 89.59 152.76 7059.64 7003.64 385215.80 5972664.20 -3023.09 -511.09 114 9611.00 90.17 154.49 7059.84 7003.84 385256.24 5972579.36 -3107.31 -469.33 115 9703.00 89.28 150.54 7060.28 7004.28' 385297.41 5972497.11 -3188.90 -426.88 116 9794.00 90.24 152.74 7060.66 7004.66 385339.38 5972416.39 -3268.98 -383.66 117 9886.00 89.07 150.26 7061.21. 7005.21 385382.00 5972334.88 -3349.82 -339.77 118 9978.00 89.55 149.61 7062.32 7006.32' 385426.84 5972254.56 -3429.43 -293.68 119 10070.00 89.90 152.02 7062.76 7006.76' 385470.44. 5972173.57 -3509.75 -248.82 120 10163.00 90.24 151.94 7062.65 7006.65 385512.85 5972090.81 -3591.85 -205.13 121 10254.00 90.72 149.33 7061.89 7005.89 385556,22 5972010.83 -3671.14 -160.51 122 10344.00 89.14 150.63 7062.00 7006.00 385600.03 5971932.23 -3749.07 -115.49 123 10436.00 89.59 149.84 7063.02 7007.02 385644.45 5971851.67 -3828.92 -69.82 124 10530.00 90.00 151.30 7063.35 7007.35 385689.35 5971769.11 -3910.79 -23.63 125 10620.00 90.41 150.86 7063.03 7007.03 385731.64 5971689.67 -3989.57 19.89 126 10713.00 90.93 150.64 7061.94 7005.94 385775.81 5971607.84 -4070.70 65.33 127 10803.00 91.47 148.87 7060.06 7004.06 385819.91 5971529.43 -4148.43 110.65 ** 10854.00 91.47 148.87 7058.75 7002.75 385845.58 5971485.38 -4192.07 137.01 1.75 1310.89 0.36 1405.88 1.09 1500.87 1.50 1592.86 0.60 1686.86 2.74 1777.84 3.11 1871.82 1.62 1963.81 3.16 2056.74 3.11 2147.64 2.76 2238.55 0.40 2332.44 1.85 2424.39 1.94 2518.34 4.40 2610.31 2.64 2701.30 2.98 2793.29 0.88 2885.23 2.65 2977.21 0.38 3070.21 2.92 3161.18 2.27 3251.12 0.99 3343.08 1.61 3437.05 0.67 3527.04 0.61 3620.02 2.06 3709.94 0.00 3760.85 Scklumberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 923 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine (Open Hole) 1/29/01 Color Well Job # Log Description Date BL Sepia Prints CD CD1-33 21034 M10,1MP & CDR LWD (PDC) 010104 1 ~1-33 21034 MD ARRAY RES (PDC) 010104 1 1 CD1-33 21034 TVD ARRAY RES (PDC) 010104 I 1 CD1-229 PB1 21035 ADN & CDR LWD (PDC) 010116 1 CD1-229 PB1 21035 MD ADN (PDC) 010116 I 1 CD1-229 PB1 21035 TVD ADN (PDC) 010116 I 1 CD1-229 PB1 21035 MD CDR (PDC) 010116 I 1 CD1-229 PB1 21035 TVD CDR (PDC) 010116 I I SIGNE~ DATE: ~~..~ '"'01 Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. MWDILWD Log Product Delivery Customer Phillips Alaska Inc. Dispatched To: AOGCC Well No CD1-33 Date Dispatche 19-Jan-01 Installation/Rig Doyen 19 Dispatched By: Nate Rose LOG Run No. Scale Original Film No Of Prints No of Floppies No of Tapes ~urveys (Paper) ,,~(3b-~l~ 2 ~° = !11 - -' I::7 ~. Received By: Please sign and return to: Anadrill LWD Division 3940 Arctic Blvd, Suite 300 Anchorage, Alaska 99503 nrosel @slb.com Fax: 907-561-8417 LWD Log Delivery V1.1, Dec '97 Alpine CD1-33 Permit Subject: Alpine CDI-33 Permit Date: Mon, 18 Dec 2000 16:10:26 -1000 From: "Vernon T Johnson" <VJOHNSOl@ppco.com> To: tom_maunder@admin.state.ak, us Tom, We are currently ahead of schedule on Doyon 19 (drilling CD1-28) and could be spudding CD1-33 as soon as Friday night. We applied for the permit last week and I wanted to give you a heads up on the rig timing, due to the upcoming Christmas holidays. If you have any questions please contact me at this email address, or the numbers below. Vern Johnson 265-6081 (wk) 242-8157 (cell) 267-0566 (pager) I of 1 12/19/00 7:52 AM ~J C¡'-r' r' ~'-~;:¡ ~E /~';"\. ~". r.~\ ["'¡ . r- t;;ì æ... rì ji (L " ^ I ( . ~ ¡ , / ,\ \ ,¡ i 1\\ \ (Ll 1\ \ (; , 'L\ .J ¡ Ii! 1/\1, II if \ ~ lJ 'J' ~) 1- if~ II L l \0) L! U\i L L, LFJ ~ } . IÆ I TONY KNOWLES, GOVERNOR / r f ALASKA OILA5D GAS I 3001 PORCUPINE DRIVE CONSERVATION COMMISSION II ~~~~~~~~7~'2~~~4~~ 99501-3192 Chip Alvord FAX, (907) 276-7542 Drilling Team Leader Phillips Alaska, Inc. POBox 100360 Anchorage, AK 99510-0360 Re: Colville River Unit CDI-33 Phillips Alaska, Inc. Permit No: 200-212 Sur Loc: 452"FNL, 2349"FWL, Sec. 5, TIIN, R5E, UM Btmhole Loc. 639~FSL, 2484~FEL, Sec. 5, Tl1N, R5E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part of the Permit to Drill application for Colville River Unit Well No. CDI-33. Please note that any disposal of fluids generated from this drilling operation which are pumped down the surface/production casing annulus of a well approved for annular disposal on the CD 1 pad must comply with the requirements and limitations of 20 AAC 25.080. Approval of this permit to drill does not authorize disposal of drilling waste in a volume greater than 35,000 barrels through the annular space of a single well or to use that well for disposal purposes for a period longer than one year. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3).Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, ,must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. aniel T. Seamount, J r. Commissioner BY ORDER OF THE COMM.ISSION DA TED this 2- I .s..:z:-- day of December, 2000 , d1fÆnclosures cc: Department 'of Fish & Game, Habitat Section w/o encl. Department of Environmenta] Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill ~ lb Type of Well Exploratory Stratigraphic Test Development Oil Re-Entry Deepen! Service X Development Gas Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. DF 56' feet Colville River Field 3. Address 6. Prope~.~s_ignation Alpine Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 .~31~a~JS'5'8 / ADL 25559 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 452' FNL, 2349' FWL, Sec.5, T11 N, R5E, UM Colville River Unit Statewide At target .~wT~casing point) 8. Well number Number 2020' F~'I_; 1095' FWL, Sec. 5, T11 N, R5E, UM CD1-33 #59-52-180 At total depth 9. Approximate spud date Amount 639' FSL, 2484' FWL, Sec. 5, T11 N, R5E, UM 12/24/00 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) Property line Alpine CD1- 34 10,854' MD 639' FSL T11N R5E feet 9.9' @ 200' Feet 2560 7,056' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 3500' feet Maximum hole angle 90.39° Maximum sudase 2484 psig At total depth (TVD) 3167 at psig 7000' 'I'VD.SS 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed 12.25" 9.625" 36# J-55 BTC 2364' 37' 37' 2401' 2400' 476 Sx Arctic set III L & 230 Sx Class G 8.5" 7" 26# L-80 BTC-M 7847' 37' 37' 7884' 7046' 109 Sx Class G N/A 4.5" 12.6# L-80 I BT-M 7546' 32' 32' 7578' 6970' Tubing (packer depth) 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length ~~ ~ ~/~(~ented Measured depth True Vertical depth Structural Conductor Surface Intermediate DEC 1 ~ ?nnl) Production Liner true measured vertical Naska 0il, Gas Cons. Commission Anchorage"" '-- I~') '" I GiNAj'~ ~. .... . Perforation depth: 20. Attachments Filing fee X Property plat BOP Sketch Diverter Sketch Drilling program X Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ {~ Title Drilling Team Leader Date (~[(L{ ,, / '~' Commission Use Only Permit Number~.Z:~- ~7.../Z. I APl number 50- /'C:)~ ,~.Z~"7- ~ I Appr°valdate/~.-.,~,"~/-'' ~;:~(~'') ISeec°verletterf°r - Other requirements Conditions of approval Samples required Yes ~ Mud Icg required Yes ~ Hydrogen sulfide measures ~ No Directional survey required ~ No Required working pressure for BOPE 2M 3M ~.5M.) 10M 15M Approved by D TaYlor Seamount Commissioner the commission Form 1'0-401 Rev. 7-24-89 Submit in triplicate Alpine: CD1-33 Procedure ( 1. Install diverter. Move on Doyon 19. Function test diverter. . 3. 4. 5. 6. 7. 8. . 11. 12. 13. 14. 15. 16. 17. 18. 19. Drill 12 1/4 inch hole to the surface casing point as per the directional plan. Run and cement 9 5/8 surface casing. Install and test BOPE to 3500 psi. Pressure test casing to 2500 psi. Drill out 20' of new hole. Perform leak off test. Drill 8-1/2" hole to the intermediate casing point in the Alpine Reservoir. Run and cement 7 inch casing as per program. Top of cement 500 feet above Alpine reservoir as per Rule 20 AC 25.030. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. BOPE test to 3500 psi. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. Drill 6 1/8" horizontal section to well TD. Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore having moved out of the Alpine reservoir sand). Displace well to brine and pull out of hole. Run 4 ½, 12.6 #., L-80 tubing with and production packer. Land hanger. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. Circulate tubing to diesel and install freeze protection in the annulus. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. Set BPV and secure well. Move rig off. RECEIVED DEC Naska 0il & Gas Cons. Commissio~ Anchorage Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD1-34 will be the closest well to CD1-33 (9.9' at 200' MD). Accounting for survey tool inaccuracies, the ellipse separation between these wells will be 8.2' at 200' MD. Drillin.q Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: There is some potential for lost circulation in the Alpine sand do to faulting. If losses are encountered, conventional LCM treatments will be used. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD1-33 will be injected into the annulus of a permitted well on the CD1 pad. The CD1-33 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 500' of cement fill above the top of the Alpine as per regulations. We request that CD1-33 be permitted for annular pumping of fluids occurring as a result of drilling operations, per regulation 20 AAC 25.080. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set at the base of the Schrader Bluff Formation (C-30). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg)* (0.052)* (Surf. Shoe TVD). 1,500 psi RECEIVED -- (12.0 ppg) * (0.052) * (2400') + 1,500 psi - 2,998 psi Pore Pressure = 1,086 psi DEC -[ ~ ~00~] Alaska 0ti & Gas Cons. Commission Therefore Differential = 2998 - 1086 = 1912 psi. Anchorage The internal 'casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 27992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 47599 psi 7,240 psi 6,154 psi CD1-33 DRILLING FLUID PROGRAM SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 ~" Section - 6 1/8" point- 12 ~, Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.2 ppg PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 160 12 - 14 cc/30 rain PH 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 KCL 6 % Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at +_ 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel / polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with _+ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. CD1-33 / ~, 16" Conductor to 114' / /~ 4a; 11/72';00, amTvcD°=D1BToNiP, PIM~ (3'812" ' D) @ 2401' MD / 2400' TVD cemented to surface ( ;olville River Field ~'" Injection Well Completion Plan Updated 12/11/00 A1 Injection Valve (2.125"1D) - to be installed later 4-1/2" 12.6 ppf L-80 IBT Mod. R_~3 tubing run with Jet lube pipe dope Packer Fluid mix: 9.6 ode KCl Brine with 2000' TVD diesel cap Tubing Supended with diesel TOC @ +/- 7278' ME (+500' MD above top Alpine) Top Alpine at 7778' MD / 7033' TVD Completion MD TVD Tubing Hanger 32' 32' 4-1/2", 12.6#/ft, IBT-Mod Tubing Camco DB Nipple 1701' 1700' 4-1/2", 12.6#/ft, IBT-Mod Tubing S3 Packer (c/w handling pups) 7578' 6970' 4-1/2" tubing joint (1) R2 HES "XN" (3.725" ID) - 68 deg 7635' 6993' 4-1/2" 10' pup joint WEG - 69 deg 7645' 6996' Baker S3 Packer at +/- 7578' (<200' MD above to top Alpine) Well TD at 10854' MD / 7056' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 7884' MD / 7046' TVD @ 87 deg i' Colville River Field CD1-33 Injection Well Completion Plan Formation Isolation Contingency Options Updated 12/11/00 16" Conductor to 114' 4-1/2" Camco DB Nipple (3.812" ID) @ 1700' TVD = 1701' MD 9-5/8" 36 ppf J-55 BTC Surface Casing @ 2401' MD / 2400' TVD cemented to surface 4-1/2" 12.6 ppf L-80 IBT Mod. tubing run with Jet Lube Run'n'Seal pipe dope (A) Bonzai ECP Assembly - Baker ZXP Packer (4.75" ID) - Baker HMC Liner Hanger - XO to IBT-Mod - blank 4-1/2" joints (TBD) - Cementing Valve - Baker Payzone ECP (mud inflated) -Landing Collar - 4-1/2" joint (1- 2) blank · - Guide Shoe (B) Open Hole Scab Liner - Baker Payzone ECP (cement inflated) - 4-1/2" joints (TBD) blank tbg - Baker Payzone ECP (cement inflated) - Baker Model XL-10 ECP (anchor) - Muleshoe / Entry Guide TOC @ +/- 7278' MD (+500' MD above top Alpine) (C) Open Hole Brid_~e Plu_~ Assembly - Baker Payzone ECP (cement inflated) -XO -Float Collar - 4-1/2" Float Shoe Well TD at Baker S3 Packer set at +/- 7578' 10854' M D I _ 7056' TVD ® ..... · .... ® ............ N_a ........ 7" 26 ppf L-80 BTC Mod Production Casing @ 7884' MD / 7046' TVD @ 87 deg CD1-33 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/I'VD(fi) gal) 16 114 / 114 10.9 52 53 9 5/8 2401 / 2400 14.2 1086 1532 7"' 7884 / 7046 16.0 3188 2484 'N/A 10854/7056 16.0 3193 N/A · NOTE: Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP-(0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point . ASP CALCULATIONS Drilling below conductor casing (16") ASP = [(FG x 0.052)-0.1] D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1086 - (0.1 x 2400') = 846 psi 2. Drilling below surface casing (9 5/8") ASP = ASP = [(FG x 0.052) - 0.1] D [(14.2 x 0.052) -0.1] x 2400 -- 1532 psi OR FPP - (0.1 x D) 3134- (0.1 x 6926') = 2484 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3134 - (0.1 x 6926') = 2484 psi 9 518" Surface Casing run to 2401 MD 12400' TVD. Cement from 2401' MD to 1901' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 1901' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost. Lead slurry: (1901'-1557') X 0.3132 ft3/ft X 1.5 (50% excess) = 161.6 ft3 below permafrost 1557' X 0.3132 ft3/ft X 4 (300% excess) = 1950.6 ft3 above permafrost Total volume = 161.6 + 1950.6 = 2112.2 ft3 => 476 Sx @ 4.44 ft3/sk System: Tail slurry: 476 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 ft~/sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124 extender and 9% BWOW~ D044 freeze suppressant 500' X 0.3132 fts/ft X 1.5 (50% excess) = 234.9 ft3 annular volume 80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume Total volume = 234.9 + 34.7 = 269.6 ft~ => 230 Sx @ 1.17 ft3/sk System: 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S001 accelerator @ 15.8 PPG yielding 1.17 fta/sk 7" Intermediate Casing run to 7884 MD / 7046' TVD Cement from 7884' MD to +/- 7278' MD (minimum 500' MD above top of Alpine formation) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Slurry: (7884' - 7278') X 0.1268 ft3/ft X 1.4 (40% excess) = 108 ft3 annular volume 80' X 0.2148 ft3/ft = 17.2 fts shoe joi~nt volume Total volume = 108 + 17.2 = 125 ft° => 109 Sx @ 1.15 ft~/sk System: 109 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersa~nt, 0.25% D800 retarder and 0.18% D167 fluid loss additive @ 15.8 PPG yielding 1.15 ft°/sk I By Weight Of mix Water, all other additives are BWOCement ic~t'~ ~ ~"~ For: S. Re~nolds I Date plottee: 1-Dec-2~ ~ PI~ Retere~ae ;e CD1-33 Ve~n~5. ] C~r~no~ ore ;n feet ref~ence ~T.e Ve.;col ~pth ..... f ...... RKB (~. 19)j ~ INT;O j Phillips Alaska, Inc.i Structure: CD#1 Field: Alpine Field Well : 33 Location: North Slope, Alaska 60 40 20 240 220 200 160 160 140 1300 5600 1200 5500 (- West (feet) 120 100 80 1600 1100 5400 0 5300 1100 1000 900 1200 1100 1000 20 1200 1100 1000 900 800 700 600 4o 60 1000 900 800 80 100 120 1000 600 60 40 20 0 20 40 60 80 "-- ....600 :5400 ,..o ~° 1500 '"~'"--.....,: 1400 ?-~400 ~ 1000 900 1200 ~ ~ 20 400 700 ~ 400 ~ 0 5700 ~ ~ 500 ~ 500 20 ~.~800 70O 700 600 400 800 800 / 1800 700 600 500'00 70// /6000 O0 800 800t /: 120( / 900 .'~ / /6100 I00 · .-' 90~,/,' 900~ 140 1000 449. 160 ..-'" /~000 / /6200 ..- / 1000~ i' 1000, ,,o ?-- ..- / / ~63oo 15oo 200 / 1600 26o~ ...-'~2oo / ,~vu 2 o .... 280 / i i i i i i i i i i i i i i i i i i i i i 240 220 200 180 160 140 120 100 80 60 40 20 0 <- West(feet) 9OO 1000 900 1000 8o U1 12O0 0 oo [ 1300 100 :3' 1400 ~ (D 120 ~ 1500 v I ~¢o v 700 160 180 1200 2OO 22O 240 , 280 2~0 40 60 Phillips Alaska, Inc., Structure: CD#I Well : 33 i Field: Alpine Field Location : North Slope, Alaskai <- West (feet) 1600 1500 1400 1300 1200 11 O0 1000 900 800 700 600 500 400 300 200 1 O0 0 100 2OO 300 400 5OO 600 700 800 -C: go0 0 (~ 1000 I 1100 1200 1300 3200 3600 1600 4400 5200 4800 1800 1400 15OO 1600 1700 2000 1600 2200 2800 3000 2400 3200 · 2600 2000 3600 4000 · i4~ ~ 600 2800 ··· , .~29 / , 2400 i~ ~/ // / ' ·; ;[/2000 / 2600 2400 2800 !0( / ~oo / // 4200 ,/ 2000 ,.- / // /.oo /~ooo /~oo/ ,' /// / 2200 I , /2200 / / ' / / / t 28002400 ! % ',, /o / ~ 0 600 ~ 7000 ,, , / /~ooo/ '',, / / / '" ~ 2800 ""' ~ '" 600 , ,,,, / /~oo / ..., ,,,, / / ;, ooo .... i i i i i i i i i i 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 1800 , <- West (feet) 100 2OO 300 400 500 600 700 800 0 r-' ,--i- 900 ~ ...+. 1000 v I V 1100 12 O0 1300 1400 1500 1600 1700 1800 Dote pzottecl: I-Dec-2000 Plot Reference :- ~at. ore ;n f.~ V~I ~pthl o~ t~ere~e RKB (~n 19),~ .................................. ~.~. ................................................ Phillips Alaska, Inc.! Structure: CD#1 Well : 55 Field: Alpine Field Location: North Slope, Alaskai - <- West (feet) 1800 1600 1400 1200 1000 800 600 400 200 0 200 400 600 800 1000 1200 1400 I I I I I I I ! I I t I I I I / I I I I .~ I, I I I I I I I I I 1000 ~.... 200 ~NNN~' ~ ~ ~ 1000 ~-~ooo.~,~8oo t~ I i I '. ~°°~.oo .~oo ,,oo ~o ', ~! f ~ ',,.',. ~ooo -~.. ,,oo ~ / ~ 2800 ' ', ~ ~ooo /~oo i ~.oo , ', , ~ , / I~OO~/ ~ .,~,oo ~ ,,oo 1400 ~x.~ ' ~". 3000 "', ...""~ '.. ~.oo / ~.oo ~ ,~ ~oo ,,oo .....,,,,...... / / oo/ ooo , oo "'.. ~ / t [ / 3400 ', ". ~3800 .., '.../~oo I / ~ 1800 '.. , /. ~ 3400 J 3200 ~ '. " fi4000 1800 ". ~./ ',. / [ ~ 3600 ', '.. 2~ ". / . / '~ '~ ~4200 ~ooo 'Zo~'.,.~, ~oo ~oo ,, ,, ~ ~ooo /". ', ".. ~ .... / / ; 2~o~., ~oo 2200 ',. ~x '. ~3200 '.. ~/ '~.. / I .~ ,, ~ 2200 /' ".../~00"...... t 3800 ~4200 2400 ~ ~, k "t. / / [, ~ ~ 5000 2400 5400 '. ~ " 4400 ,2800 1~4oo t ", ', '. ~ooo · ,oo i / .. , ..., t,oo , ...~ ~oo "...... ',, t..,~oo / /~ '" 'fl'" f,oo ',~ooo ',,.,t 2800 200'", 4~0 5600 /~.oo / '..../', '... ~,ooo ',. ',.. ~ /. '~.~o '. ~ ', ',.~ 3000 400 ". ~ '.. 5200 ~ '""~ - ~000 / J4800 ~- " / / ~ '.. ', ". 15400 ~oo ~oo / ", , '",, I ', ~ ~oo / pooo ,, ,,, ..,. ~..o ,, , ~ ",, [ 3400 /4800 ~5200 ".. ', ".. [ 5800 ,, 3400 ~ / "'., ,, '.., ~ ,~oo . ~ J5400 '". ~ "'. ~ 6000 ~,oo /~ooo r' ..... ,, ... ~ ,, -~,oo O0 '" ~x '" ~800 ~ ~5200 ] "'... x '~'.. ,8400 ~ I ~ ~oo ', ', ... ~', ,ooo~ ~ I '....... ,, '...,.~ ~,oo ,, ~ooo ~¢~ t.o ',. ',, ..':~.oo "°°1~ ~.~oo , ..,,,,~,~.oo 4400 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ / 4400 1800 1600 1400 1200 1000 800 600 400 200 0 200 400 600 800 1000 1200 1400 (- West (feet) D~te plotted: 1-Dec-2000 Plot Rcferer~e 1~ CD1-33 Vem;onJf5. Coordln~B ~ra ;n f~t reference VeK~ol ~pths ore reference RKB (D~n 19).~ I~I'EO ............................................................................................... Phillips Alaska, Inc. Sfrucfure: CD#1 Well: 55 Field: Alpine Field Location: Norfh Slope, Al(3skai 218.52 AZIMUTH 2oo ' ***Plane of Proposal*** <- West (feet) 1800 1500 1200 900 600 300 I I I I I I I I I I I I TARGET LOCATION J 2020' FNL, 1095~ FWL SEC. 5, T11N, R5E INTERM. POINT J 936' FSL, 1795' FWL SEC. 5, T11N, R5E SURFACE LOCATION 452' FNL, 2549' FWL SEC. 5, T11N, R5E 0 300 I I I Beg. 9 Deg. Bid/Turn HRZ K-1 LCU Miluveoch A Alpine D '*,.Alpine ~.' '... Target - Csg Pt ',, ., ,, ',, EOB · ., '",. ",. Base Alpine ., Begin Nudge Be~ionc Drop /u~o. WO Sak.mafrost C-40 C-30 9 5/8 Cosing Pt. C-20 K-3 K-2 KOP EOB TD LOCATION 659' FSL, 2484' FWL SEC. 5, T11N, R5E '". '",,, Beg. 1 Deg. Bid/Turn '"' ',. Interm Pt-EOC TD - Csg Pt"'"',.~..~'~ 600 I 300 0 300 6O0 9O0 1200 1500 1800 "+' 2100 -..i- 2400 I V 2700 3000 3300 3600 3900 ~ 4200 - 4500 400 8OO 1200 1600 2000 2400 2800. 3200- . 3600- 4ooo- [.... 4400 I 4800 5200 56OO 6000 6400. . 6800- 7200 I RKB Elevation: 56' Beg~n Nudge 2.00 4.aa Begin Drop 4.00 2.00 £0C W. Sok Phillips Alaska, Inc. Structure: CD#I Well: 55 Field: Alpine Field Location: North Slope, Alaska DLS: 2.00 deg per 100 ft a 18.52 AZIMUTH 2005' (TO TARGET) ***Plane of Proposal*** Permafrost C-40 ~-53/08 Casing Pt. C-20 KOP 5.00 6.00 DLS: 3.00 dog per 100 ft ~9.00 K-3 ~12.00 ~ 15.00 K-2 % 18.oo ), 21.00 ~ 24,OO '~ 27.O0 ~ TANGENT ANGLE  3g.09 DEG %%kkAlbl°n-97  Albion-96 ~. Beg. 9 Deg. Bid/Turn . '~ 32.6g .~ TANGENT ANGLE _. N35~3=9~,L-~v~luveoch^ 89.39 DEG TARGET ANGLE ",,. ..... ^,o~ne D z ~"~z~,,~r ,', z z-tJ.~l U'J~J~ ',~ 58 48 Aloine ~ ~0 63Torge~ - Cs..q,~Pt 87.00 DEG "'~'"%:: ' :~OB ._~3,~.~jTD - Csg Pt DLS: 9.00 dog per 100 ft Bose Alpine . Boq. I Boq. Bid/Turn Inform Pt-£OC i i i i i i i i i i i i i i i i i i i i 0 400 600 1200 1600 2000 2400 2800 3200 3600 Verficol Section (feet) -> Azimuth 218.52 with reference 0.00 S, 0.00 E from slot #55 FINAL ANGLE 90.39 DEG [Creoted by bowers Fol': S. Reynolds Dote plotted: 4-D~-2~ P~ Referee ~ CDI~ Ve~n~5. ~T~ Ve~=l ~pt~ am mlere~ RKB (~n 19). INTEQ .i Phillips Alaska, Inc. Structure: CD#I Well: 55 Field : Alpine Field Location : North Slope, AlaskaI 151.85 AZIMUTH a?O4' (*0 ***Plane of Proposal*** 6000- 6150 6,100 6450 6600 6750 6900 7050 7200 7,150 ,1aa TARGET ANGLE LCU 5B.4B 87.00 DEC 65'~v~luve(x;h A~ DLS: 9.00 de(J per 100 ft Alp,ne u 3.08. Alp,ne ~ Target - C;g Pt EOB Base Alpine TANGENT ANGLE 89.39 DEG Beg. 1 Deg. Bid/Turn Interm Pt-EOC i i i ! i i i i i i i i i i i i i i ! i i i [ i i i i ! i i ! 450 600 750 900 1050 1200 1,350 1500 1650 1800 1950 2100 2250 2400 2550 2700 Verficc]l Section (feet) -> FINAL ANGLE 90.39 DEG i ! i! i 2850 ,1000 .tl 50 Azlmufh 151.85 wlfh reference 0.00 N, 0.00 E from slot //55 TD - Csg Pt i i i i i i i i i ,1300 3450 3600 3750 3900 c~w ~ ~.,~ For: S. Reynolds] Date plotled: 4-Dec-2000 / Pier Relevance ;8 ~1-~ ~ ~ C~;~l am ;fl f~t ~emnce ~ ~33. / ......................... ~ ................................... J 32O 310 Phillips Alaska, Inc.i Structure: CD~I Well: 35 Field: Alpine Field Location: North Slope, AlaskaI ~)'.,~,~,°°340 330 ~'. 35O TRUE NORTH 1100 " ,. ~ ~3oo 30 470C 300 1100 3OO 290 ~0 1700 70 280 8O 270 700 90 26O 25O 100 ~00 110 120 220 140 0 ~oo '", 150 200 ~6'~ 170 Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well 130 Creuted by bowers For: S. Reynolds Date plotted: 1-Dec-2000 Plot Reference ~s CD1-35 VersionS5. Coordinates are in feet reference elot True Vertical Depths are reference RKB (Doyon lg).; iPhillips Alaska, Inc i Sfruclure: CD#! Well: 53 Field: Alpine Field Location: North Slope, PROFILE COMMENT DATA I ! Point l!i~:~DropNUdge JW. Sok Permafrost C-40 iC-50 i9 5/8 Cosin9 Pt. C-20 KOP K-5 K-2 EOB Albion-97 iAIbion-96 Be9. 9 De9. Bid/Turn HRZ K-1 LCU Miluveoch A Alpine D Alpine Torget - Cs9 Pt iEOB Bose Alpine Beg. 1 De9. Bid/Turn Interm Pt-EOC TD - Csg Pt MD 250.00 550.00 850.00 1047.10 1557.10 2177.10 2587.10 2401.10 2767.10 3500.00 58'35.79 4044.44 4569.68 6083.44 6543.77 6947.19 7064.19 7294.96 7441.73 7617.34 7679.43 7777.54 7883.67 8125.07 8261.86 928.3.58 9584.02 10854.46 Inc Dir TVD North 0.00 150.00 250.00 0.00 6.00 150.00 549.45 - 10.09 0.00 150.00 848.90 -20.18 0.00 150.00 1046.00 -20.18 0.00 130.00 1556.00 -20.18 0.00 150.00 2176.00 -20.18 0.00 150.00 2586.00 -20.18 0.00 150.00 2400.00 -20.18 0.00 150.00 2766.00 -20.18 0.00 150.00 3498.90 -20.18 10.01 256.01 5851.00 -56.44 16.55 256.01 4056.00 -65.27 52.09 256.01 4515.55 -185.52 32.09 256.01 5796.00 -652.92 52.09 256.01 6186.00 -769.65 52.09 256.01 6527.78 -889.47 54.20 217.07 6626.00 -955.20 44.99 188.85 6805.00 - 1067.04 54.44 176.67 6900.00 -1178.40 66.94 165.54 6986.00 - 1528.89 71.55 162.15 7008.00 -1584.62 78.95 157.14 7055.00 - 1475.46 87.00 151.99 7046.00 - 1568.45 89.59 151.98 7055.55 -1779.67 89.59 151.98 7055.00 - 1902.20 89.39 151.98 7065.81 -2804.14 90.59 151.85 7066.00 -2892.75 90.39 151.85 7056.00 -4189.26 Eost 0.00 12.02 24.04 24.04 24.04 24.04 24.04 24.O4 24.04 24.05 -0.08 -39.86 -217.89 -884.66 - 1087.45 -1265 12 -1510 84 - 1565 04 - 1567 56 - 1 543 09 - 1 326 92 - 1 293.89 -1248.66 - 1156.28 -1071.09 -591.21 -545.95 149.75 V. Sect 0.00 0.40 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 28.56 74.52 279.15 1046.17 1279.42 1485.84 1546.55 1685.75 1775.69 1876.19 1909.72 1958.65 2OO4.79 2100.05 2155.50 2562.06 2601.94 3184.25 Deg/lO01 O.OOi i 2.00i 2.00i O.OOi 0.00i 0.00' 0.00 0.00 0.00 0.00i 3.00i ! 3.ooi .:, 3.ooi 0.001 0 00' 0 O0 9 900l 9 O0i 9 00! 9.ooi 9.oo! .., 9.00! 1.00i 0.00i 0.001 · 1.00i 0.001 Phillips Al&ska, Inc. CD91 33 slot #33 Alpine Field North Slope, Alaska PROPOSAL LZSTING ~kez~esI~9 Your re£ : CD1-33 Version95 Our ref : prop3537 .License : Date pr4nted : 4-Dec-2006 Date created : 11-Aug-1999 Last revised : 1-Dac-2000' Field is centre~ on n?o 20 37.100,w150 51 37.53 Structure is centred on nT0 20 37.1000w~50 56 46.04! Slot locat~ou is n?0 20 32.663,w150 55 37.'375 Slot Grid coordinates are N 5975678.725° S 385773.787 Slot loc&l coordinates a~e 450.74 S 2350.50 E Pro]ectiout~pe:. &laska - zOne 4, Spheroid: Clarke - 1866 Re~erenoe North is .True North ~SS!LULUO::) 'SUO0 S~ '~ i~ e'4sqV oooz 03AI30 W Ph£11ips Alaska, Inc. CD#lo 33 Alpine Field,North Slope, Alaska Measured Inclin Azimuth True Vert Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 100.00 0.00 130.00 100.00 200.00 0.00 130,00 200.00 250.00 0,00 130,00 250.00 350,00 2,00 130,00 349,98 450,00 4.00 130,00 449.84 550,00 6,00 130,00 549.45 650,00 4.00 130.00 649,07 750,00 2,00 130,00 748,92 850,00 0.00 130.00 848.90 1000,00 0.00 130,00 998,90 1047.10 0.00 130.00 1046.00 1500,00 0.00 130.00 1498.90 1557.10 0,00 130.00 1556.00 2000.00 0.00 130.00 1998.90 2177.10 0,00 130,00 2176,00 2387.10 0.00 130.00 2386,00 2401,10 0,00 130,00 2400.00 2500,00 0.00 130,00 2498,90 2767.10 0,00 130,00 2766,00 3000,00 0,00 130,00 2998,90 3500,00 0,00 130,00 3498,90 3600,00 3,00 236,01 3598.86 3700.00 6,00 236,01 3698,54 3800,00 9,00 236,01 3797.67 3833,79 10,01 236,01 3831.00 3900.00 12,00 236,01 3895,99 4000,00 15,00 23.6.01 3993,21 4044.44 16,33 .236,01 4036,00 4100.,0018,00 236,01 4089,08 4200~00 .21,00 236,01 4183,34 4300.00 24,00 236,01 4275,71 4400,00 27.00 236,01 4365,96 4500,00 30,00 236,01 4453,83 4569,68 32,09 236,01 4513,53 5000.00 32,09 236,01 4878.10 5500.00 32,09 236,01 5301,71 6000,00 32,09 236~01 5725,31 6083.44 32,09 236,01 .5796,00 6500,00'32.09 236,01 6148,92 6543.77 32,09 236,01 6186,00 6947,'1932,09 236,01 6527,78 7000,00 32,69 227,20 6572,40 7064,19 .34,20 217,07 6626,00 7100,00 35,39 211,82 6655,42 7200,00 .39,75 198,87 6734,79 7294.96 44.99 188,83 6805,00 7300,00 45,29 188,35 6808,55 7400,00 51,63 179,79 6874,90 7441.73 54,44 176,67' 6900.00 RECTANGULAR COORDINATES 0.00S 0.00E 0.00S 0.00E 0.00S 0.00E 0.00S 0.00E 1,125 1.34E 4.495 5.358 10 · 095 12 · 028 15 , 695 18,708 19.055 22.71E 20.185 24.04E 20.185 24.048 20.185 24.048 20.185 24.04;- 20.185 24.048 20.185 24.048 20.185 24.04E 20.185 24.04E 20.185 24.048 20 . 185 24 . 048 20.18S 24.04R 20,185 24,048 20,185 24,058 21,645 21.878 26.035 15,378 33,325 4,558 36.445 0.08~ 43 · 515 10 · 56W 56,565 29,91W 63 · 275 39 · 86W 72 · 445 53 . 46W 91 · 105 81 . 13W 112 · 495 112 . 85W 136.565 148.55W 163.235 188 . 10W 183 · 325 217.89W 311.135 407 . 44W 459. 645 627,68W , 608 · 145 847'. 91W 632,926 ' 884.66W 756 · 65S 1068.15W 769 . 655 1087.43W 889.475 1265.12W 907.015 , 1287.23W 933.205 ' 1310.84W 950.055. 1322.38W 1005,025 1348.04W 1067. 045 1363.04W 1070,575 1363,58W 1145,085 ' 1368,61W 1178 .'405 1367,56W PROPOSAL LISTING Page 1 Your re£ : CD1-33 Version%5 Last revised : 1-Dec-2000 GRID COORDS GEOGRAPHIC East~ng Northing C O O R D I N A T R S 385773.79 5975678.72 nT0 20 32.66 w150 55 37.38 385773.79 5975678.72 nT0 20 32.66 w150 55 37.38 385773.79 5975678.72 n70 20 32.66 wlSO 55 37.38 385773.79 5975678.72 nT0 20 32.66 w150 55 37.38 385775.11 5975677.58 nV0 20 32.65 w150 55 37.34 385779.06 5975674.16 n70 20 32.62 w150 55 37.22 385785.65 5975668.45 n70 20 32.56 w150 55 37.02 385792.24 5975662.75 nT0 20 32.51 w150 55 36.83 385796.19 5975659.32 nT0 20 32.48 w150 55 36.71 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51.5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20 32.46 w150 55 36.67 385797.51 5975658.18 nT0 20,32.46 w150 55 36.67 385797,51 5975658,18 nT0 20 32.46 w150 55 36,67 385797,51 5975658,18 n70 20 32,46 w150 55 36.67 385795,32 5975656,75 nT0 20 32.45 w150 55 36..74 385788,75 5975652,47 nT0 20 32.41 w150 55 36,93 385777,82 5975645,34 nT0 20 32,34 w150 55 37~24 385773,14 5975642,29nT0 20 32,31 w150"55 37,38 385762,55 5975635,39nT0 20 32,24 w150 55 37.68 385743,00 5975622,64nT0 20 32,11 w150 55 38,25 385732,95.5975616,09'nT0 20 32.04 w150 55 38,54 385719,22 5975607,13nT0 20 31,95 w150 55 38,94 385691.26 5975588.91'nV0 20 31,77 w150 55 39,75' 385659,21 5975568,01 nT0 20 31,56 w150 55 40,67 385623.15 5975544,51 nT0 20 31,32 w150 55 41,72 385583,19 5975518.45 nT0 20 31.06 w150 55 42.87 385553,09 5975498,83 nT0 20 30,86 w150 55 43',74 3853'61.59 5975374,00 nT0 20 29,60 w150.55 49,28 385139,09 5975228.94 nT0 20 28,14 w150 55 55,71 384916,59 5975083,89 nT0 20 ·26,68 W150 56 02,15 384879,46 5975059,69 nT0 20 26,44' w150 56 03,22 384694.09 5974938,84 nT0 20 25.22 w150 56 08.58 384674;62 59;74926,14nT0 20 25,10 wi50 56 09,i5 384495,09 5974809.11 nT0 20 23,92. w150 56 14.34 384472.72 5974791.91 nT0 20 23.'/5 w150 56 14.98 384448.70 5974766.10 nT0 20 23.49 w150 56 15.67 384436,91 5974749.43 nT0 20 23,32 v150 56 16.01 384410,40 5974694,87 nT0 20 22,78 w150 56 16,76 384394,43 5974633.10 nT0 20 22:17 w150 56 17,20 384393,85 5974629,58 nT0 20 22,14 w150 56 17.21 384387,66 5974555,16 nT0 20 21,40 w150 56 17,36 384388,18 5974521,83 nT0 20 21,08 'w150 56 17.33 u .o.o.O!~lmmOO 'suoo seg t~.1!0 O3A130.3 All data in feet unless otherwise s~ated. Calculationuses minimumcurvature method. ¢oo~dlnates £ron slot #33 and ~VD £rom RKB (Do,on 19) (56.00 Ft above mean sea level). Bott~hole d/stance is 4191.93 on sz~nuth 177.95 degrees fronwellhead. Total Dogleg for wellpath is 131.77 degrees. Vertical section is from wellhead on azimuth 218.52 degrees. Grid is alaska - Zone 4. Grid coor~4nates in F~ET and ccm~uted using the Clarke - 1866 spheroid. Presantedby Baker Hughes INTEQ , . Phillips ~aska, Inc. CD#1,33 ~pine F~eld,Nor~h Slope, PROPOSAL LISI~I~ Page 2 Your re£ : CD1-33 Version#5 Last rev£sed : 1-Dec-2000 HeasuredZncl~n Azimuth TL-ue Vert R E C ? A N G U L A R G R Z D C 00 R D S G ~ 0 Dep~ Degrees ~ees ~th C 0 0 R D I N A T R S hst~ Not~g C 0 0 7500.00 58.48 1~2.66 6932.20 1226.72S 1363.01W 384391.98 59~4473.45 nTO 20 7600.00 65.67 166.53 6979.03 1313.48S 1346.92W 384406.72 5974386.46 nTO 20 7617.34 66.94 165.54 6986.00 1328.89S 1343.09W 384410.31 5974370.99 nTO 20 7679.43 71.55 162.15 ~008.00 1384.62S 1326.92W 384425.61 5974315.02 nTO 20 7700.00 73.08 161.07 7014.25 1403.22S 1320.74W 384431.50 5974296.33 nTO 20 7777.54 78.93 157.14 7033.00 1473.46S 1293,89w 384457.25 5974225.69 nTO 20 7800.00 80.63 156.03 ;036,98 1493.74S 1285.11~ 384465.72 5974205.28 nTO 20 7883.67 8~.00 151,99 7046,00 1568.45S 1248.66~ 384500.99 5974130.02 nTO 20 7883.69 8~,00 151.99 ~046.00 1568.46S 1248.66~ 384501.00 5974130.00 nTO 20 7983.69 88.00 151.98 ;050.36 1656.66S 1201.V3~ 384546.54 5974041.09 nTO 20 8083.69 89.00 151.98 ~052,98 1;44.91S 1154.78~ 384592.12 5973952.13 nTO 20 8123.0; 89.39 151.98 7053.53 1379.67S 1136.28~ 384610.07 5973917.09 nTO 20 8261.86 89.39 151.98 7055.00 1902.20S 1071.09~ 384673.34 59~3;93.5; nTO 20 8500.00 89.39 151.98 705~.52 2112.42S 959.24~ 384381,89 5973581.66 nTO 20 9000.00 89.39 151.98 7062.81 2553.80S 724.40~ 385009.82 5973136.71 nTO 20 9283.58 89.39 151.98 7065.81 2804.14S 591.21~ 385139.10 5972884.35 nTO 20 9300.00 89.56 151.96 7065.96 2818.63S 583.50W 385146.59 5972869.74 nTO 20 9384.02 90.39 151.85 V066.00 2892.75S 543.93N 385184.99 5972795,02 nTO 20 9384.04 90.39 151.85 ~066.00 2892.78S 543.92W 385185.00 5972;95.00 nTO 20 9500.00 90.39 151.85 7065.21 2995.02S 489.22W 385238.10 5972691,93 nTO 20 10000.00 90.39 151.85 ;061.81 3435.87S 253.35W 385467.06 5972247.50 nTO 19 10500.00 90.39 151.85 7058.41 38q6.V3S 17.48~ 385696.03 59~1803.06 nTO 19 10854.46 90.39 151.85 ~056.00 4189.26S 149.73E 385858.35 5971488.00 nTO 19 GRAPHIC RDINATES 20.60 19.75 19.60 19.05 18.87 w150 56 17.20 w150 56 16.73 w150 56 16.62 w150 56 16.14 w150 56 15.96' 18.17 17.98 17.24 17.24 16.37 w150 56 15.18 w150 56 14.92 w150 56 13.86 w150 56 13.86 w150 56 12.49 15.51 15.16 13.96 11.89 07.55 w150 56 11.12 w150 56 10.58 w150 56 08.67 w150 56 05.41 w150 55 58.55 05.09 04.94 04.21 04.21 03.21 w150 55 54.67 w150 55 S4.44 w150 55 53.29 w150 55 53.29 w150 55 51.69 58.87 54.54 51.46 w150 55 44.80 w150 55 37.92 w150 55 33.04 c~ta iu feet unless, otherwise stated. Calculat$on uses ~ c~at~e ~od. Coo~na~es ~r~ slo~ %33 ~d~ fr~ (~ 19) (56.00 F~ ~~ sea 1~1). Bo2t~hole ~s=~ce is 4191.93 ~ az~h 177.95 d~rees fr~llhead. ~al Do~l~ for~11pa~h is 131.77 d~rees. Vertical secbi~ is Er~llhead ~'az~th 218.52 ~rees.. Grid is alas~ - Z~e.4. 'Grid coord~tes in F~ ~ c~t~ us~ ~ Clarke - 1866 ~eroid, Phillips Alaska, Inc. CD#1,33 Alpine Field,North Slope, Alaska PROPOSAL LZSTZNG Page 3 Your re£ : CD1-33 Version#5 Last revised : 1-Dec-2000 Comments in wellpath MD TVD Rectangular Coords. Cc=ment 250.00 250.00 0.00S 0.00E Begin Nudge 550.00 549.45 850.00 848.90 1047.10 1046.00 1557.10 1556.00 2177.10 2176.00 2387.10 2386.00 2401.10 2400.00 2767.10 2766.00 3500.00 3498.90 3833.79 3831.00 4044.44 4036.00 4569.68 4513.53 6083.44 5796.00 6543.77 6186.00 6947.19 6527.78 7064.29 6626.00 7294.96 6805.00 744~.73 6900.00 7617.34 6986.00 7679.43 7008.00 7777.54 7033.00 7883.67 7046.00 7883.69 7046.00 8123.07 7053.53 8261.86 7055.00 9283.58 7065.81 9384.02 7066.00 9384,04 7066,00 ~0854.46 7056'.00 10.09S 12.02E Begin Drop 20.18S 24.04~ 20.18S 24.04B H. Sak 20.18S 24.04E 20.18S 24.04E C-40 20.18S 24.04E C-30 20.18S 24.04E 9 5/8' Casing P~. 20.18S 24.04E C-20 20.18S 24.05~ KOP 36.44S 0.08W K-3 63.27S 39.86W K-2 183.32S 217.89W EOB 632.92S 884.66W A1bian-97 769.65S 1087.43W Albian-96 889.47S 1265.12W Beg. 9 Deg. Bld/Turn 933.20S 1310.84W HRZ 1067.04S 1363.04W K-1 1178.40S 1367.56W LCU 1328.89S 1343.09W Miluveach A 1384.62S 1326.92W Alpine D 1473.46S 1293.89W Alpine 1568.45S 1248.66W Target - Csg Pt 1568.46S 1248.66W CD1-33 Tgt Rvsd 21-Nov-00 1779.67S 1136.28W EOB 1902.20S 1071.09W Base Alpi~e 2804.14S 591.21W Beg. I Deg: Bld/Turn 2892.75S 543.93W Zn~erm 2892.78S 543.92W CD1-33 ZntermP~ Rvsd 21-Nov~00 4189.26S 149.73E TD- Csg Pt Casing positions in string 'A' ~ ~ ~ ~ Rect~lar CoorS. Bob ~ Bo~ ~ Rec~Zar CoorS. Casi~ .................................. i ............................................................... 7--T ..... 0.00 0.00 0.00S 0.00E 7883.69 7046.00 1568.46S 1248.6~ 7' Casi~ 0.00 0.00 · 0.00S ' 0.00~ 2401.10 2400.00 20.18S 24.04E 9 5/8' Cas~ Targets associated w~th this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised ............. . ...... ~- ................................................................................ ~ ..... CD1-33 Tgt Rvsd 21-N 384501.000,5974130.000,0.0000 7046.00 1568.46S 1248.66W 22-Nov-2000 . CD1-33 ZntentPt Rvsd 385185.000,5972795.000,0.0000 7066.00 2892.78S 543.92W 22-Nov-2000 Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alask= 99510-0360 Telephone 907-276-1215 December 12, 2000 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Application for Permit to Drill CD1-33 Dear Sirs: RECEIVED DEC 1 000 Alas~ Oil & Gas Cons. Commlalat Anchorage Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Water Alternating Gas (WAG) injection well from the Alpine CD1 drilling pad. The intended spud date for this well is December 24, 2000. It is intended that Doyon Rig 19 be used to drill the well. CD1-33 will be drilled to penetrate the Alpine sand horizontally. 7" casing will then be run and cemented in place. A horizontal section will then be drilled and the well completed as an open hole injector. At the end of the work program, the well will be shut in awaiting surface connection. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program, including a request for approval of annular pumping operations. 4. A drilling fluids program summary. 5. Proposed completion diagram. 6. Proposed Completion diagram with open hole isolation options. 7. Pressure information as required by 20 ACC 25.035 (d)(2). 8. Proposed cementing program and calculations. 9. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. If you have any ques. , ~s or require further information, pleas~ contact Scott Reynolds at 265-6253 or Chip Alvord at 265-6120. Sincerely, .... Scott D. Reynolds Drilling Engineer Attachments CC: CD1-33 Well File / Sharon AIIsup Drake Chip Alvord Mike Erwin Gracie Stefanescu Lanston Chin ATO 1054 ATO 1030 ANO 384 Anadarko - Houston Kuukpik Corporation e-mail · Tommy_Thompson @ anadarko.com RECEIVED DEC 1 ~ ZOO0 American Express' Cash' Advance D=aft lo4 PAY TO THE . ' . .? . - Issued by Integrated Payment System, Inc DOLLARS ~,,,u~ ~o~^.ou.~ov~$~ . WELL PERMIT CHECKLIST COMPANY F~.-&'////~_~ WELL NAME ~ ~/- ~ PROGRAM: exp dev redrll serv / wellbore seg ann. disposal para req FIELD & POOL ! Z. OIC~ INIT ~SS ~~/~ ~~J~ GEOL AR~ ~~ UNIT~ ~ ~~~ ON/OFF SHORE ~ ADMINIST~TION 1. Ps,it fee affached ........................ ~ 2. Lease number appmp~a~:~ ~ ~~ .~ ~- ~ ~ ~ ~~ ~~ ~ ~~ ~~~' ~~o ~ ~ ~ ~ ~/~ 3. Unique well name and number .................. ~ /~~ ~ ~ ~ ~~. ~ 4. Well Io~ted in a defined pool .................. DATE 5. Well located proper distance from ddlling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in ddlling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor stdng provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long stdng to surf csg ........ 18. CMT will cover all known productive hodzons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. . N N N DATE 21. 22. 23. 24. 25. 26. 27. 28. 29. .. 31. 32. II A~F~,R DATE ' 33. II_~_'/~, ~-~b 34. If a re-drill, has a 10-403 for abandonment been approved... .-y--ff YA i~, ~" ~..J['~","'c~' ' Adequate weilbore separation proposed .............. i~) N ~..k~,~: Gc~<~'~,'~. '~'~. ~.' ' ' If diverter required, does it meet regulations .......... ' ,~ N ~ ' - '. - . Drilling fluid program schematic & equip list adequate ..... BOPEs, do they meet regulation ....... ;. ~.~..,,, ..... . BOPE press rating appropriate; test to L'gE-S.x~ Dsig. Choke manifold complies w/APl R.P-53 (May 84) ........ Work will occur without operation shutdown .................. ........... ~:.~ ~, <-J~~ ~ ~'~" '~'-'~-"~'~ ~. ~"~r"'""~ ~r'~ Is presence of H2S gas probable ~A,._3~ ~'.~.~. ~, ~ is~..~x'~'~C. ~,.~..~, DataPermitpresentedcan be issued wlo hydrogen sulfide measureS.on potential overpressure zones .... · Seismic analysis of shallow gas zones ......... ' ..... N ' Seabed condition survey (if off-shore) ......... ' .... ~?d/f Y . Contact name/phone for weekly progress reports [expl~,te~ only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR . DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical'integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E). will not circumvent 20 AAC 25.252 Or 20 AAC 25.412.. Y N ENGINEERING: . UlClAnnular COMMISSION: ~QF-i..~....~_~,." . WM ~)1~1SHC~ l~.~' Comments/Instructions: ~c,~ i'~"co,~',~ ~*~. c~.p. i~.. ~' ~l~r~~ ~.~ p~' 0 Z 0 rtl Z -!- c:Vnsoffice\wordian~diana\checklist (rev. 11/01fl00)