HomeMy WebLinkAbout195-0861. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other:
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 10193'feet None feet
true vertical 6107' feet None feet
Effective Depth measured 10193'feet 9653', 9768'feet
true vertical 6107' feet 5693', 5779' feet
Perforation depth Measured depth
True Vertical depth
Tubing (size, grade, measured and true vertical depth) 3-1/2" L-80 9793' MD 5798' TVD
Packers and SSSV (type, measured and true vertical depth) 9653' MD
9768' MD
N/A
5693' TVD
5779' TVD
N/A
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title:Contact Phone:
N/A
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
386
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
N/A
Packer: FHL Rtrvbl Packer 47B2
Packer: Bkaer SABL-3 Perm Packer
SSSV: None
Katherine O'Connor
katherine.oconnor@conocophillips.com
(907) 263-3718Senior Well Interventions Engineer
9866-9875', 9895-9899', 9905-9925', 9954-9970'
5854-5860', 5876-5879', 5883-5899', 5921-5933'
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
Well Remains offline
Gas-Mcf
MD
1200
Size
121'
~~~
100 269262
~
measured
TVD
7"
7"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
195-086
50-103-20224-00-00
P.O. Box 100360
Anchorage, AK 99510
3. Address:
ConocoPhillips Alaska, Inc.
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0025568, ADL2225569
Kuparuk River Field/ Kuparuk River Oil Pool
KRU 2T-22
Plugs
Junk measured
Length
Production
Liner
1712'
8435'
Casing
1688'
6099'
1751'
10183'
3917'
121'Conductor
Surface
Tie Back String
16"
9-5/8"
80'
3958' 2883'
Burst Collapse
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Gavin Gluyas at 8:05 am, Feb 26, 2025
Digitally signed by Katherine O'Connor
DN: CN=Katherine O'Connor, O=
ConocoPhillips, OU=Wells Group, E=
katherine.oconnor@conocophillips.com, C=US
Reason: I am the author of this document
Location:
Date: 2025.02.25 15:13:49-09'00'
Foxit PDF Editor Version: 13.0.0
Katherine
O'Connor
JJL 02/27/25
RBDMS JSB 030325
DSR-2/28/25
DTTMSTART JOBTYP SUMMARYOPS
1/17/2025 OPTIMIZE
WELL
MIRU CTU 4 W/ 11,875' OF 2.0". DRY TAG AT 9888' CTMD, CLEAN TO 9918', NOT ABLE
TO MAINTAIN RETURNS. BRING GL ON @ 375 MCPD AND WALK IT UP TO 700 MCFD.
CLEANOUT 9,888' TO 9930'. JOB IN PROGRESS.
1/18/2025 OPTIMIZE
WELL
CONTINUE CLEANOUT FROM 9930' TO 10,000'. FREEZE PROTECT TUBING WITH 25
BBL DIESEL.
1/18/2025 MAINTAIN
WELL
FREEZE PROTECT
PUMP 20 BBLS OF DSL DWN TBG
FOLLWED BY 5 BBLS METH DWN FL
JOB COMPLETE
2/1/2025 OPTIMIZE
WELL
TEL TAG TBG TAIL @ 9752' SLM (9792' RKB) 40' CORRECTION. DRIFT WITH 10' X 2.50"
DMY PERF DRIFT, TAG FILL @ 9887' SLM (9927' RKB). PERFORM SBHPS ( SEE
COMMENTS FOR DETAILS)(MAX = 1847 PSI). READY FOR E-LINE
2/3/2025 OPTIMIZE
WELL
RIH W/ 2 1/8" X 4' SPIRAL STRIP GUN. SIT DOWN ON PACKER AT 9653' RKB WITH
GUN. AFTER SEVERAL ATTEMPTS OF TRYING TO GET THROUGH PACKER STRIP
GUN WAS DAMAGED AND TOOLSTRING WAS LOSING GROUND. POOH AND REBUILD
GUN WITH DIFFERENT BOTTOM. JOB IN PROGRESS.
2/4/2025 OPTIMIZE
WELL
RUN 1: PERFORATE INTERVAL: 9895' - 9899', W/ 2.125" SPRAL STRIP GUN
RUN 2: PERFORATE INTERVAL: 9866' - 9875', W/ 2.125" SPIRAL STRIP GUN
JOB COMPLETE
2/7/2025 MAINTAIN
WELL
HOT DSL FLUSH
PUMP 80 BBLS OF 180* DSL DWN TBG
PUMP 10 BBLS OF 180* DSL DWN FL
JOB COMPLETE
2/16/2025 MAINTAIN
WELL FREEZE PROTECT TBG WITH 20 BBLS DSL & FL WITH 5 BBS METHANOL
2T-22 Perforations
Summary of Operations
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: RKB 9,927.0 2T-22 2/1/2025 rogerba
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Add Perfs 2T-22 2/4/2025 bworthi1
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR 16 15.06 41.0 121.0 121.0 62.58 H-40 WELDED
SURFACE 9 5/8 8.70 41.0 3,958.4 2,883.0 40.00 L-80 BTC
TIE BACK STRING 7 6.28 38.6 1,751.0 1,687.8 26.00 L-80 Hyd563
PRODUCTION
ORIGINAL
7 6.28 1,748.0 10,183.0 6,099.2 26.00 L-80 BTCM
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
36.8
Set Depth …
9,745.0
Set Depth …
5,762.0
String Max No…
3 1/2
Tubing Description
Tubing – Gas Injection
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
HYD563
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
36.8 36.8 0.00 HANGER 10.850 FMC Gen IV Tubing Hanger (6'' x 3
1/2'' HYD563 pin x 3-1/2" EUE box)
w/ 3.54' 3-1/2" HYD563 9.3# L-80
pup jt
FMC TC-1A-
EN
2.992
3,374.4 2,611.3 62.63 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV
SN 20819-01
VanOil MMG 2.920
6,425.4 4,029.5 62.48 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV
SN 20819-12
VanOil MMG 2.920
7,870.2 4,710.9 61.97 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- SOV
SN 20819-04
VanOil MMG 2.920
9,459.7 5,549.7 43.52 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV
SN 20819-07
VanOil MMG 2.920
9,579.6 5,638.1 41.80 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM-
DCR-1 SOV SN 20819-15
VanOil MMG 2.920
9,639.2 5,682.7 41.58 PBR 5.880 PBR 80-40 H683-19-0140 4" seals
11.80" seal length
TSH TSH 2.992
9,652.9 5,693.0 41.58 PACKER 5.970 FHL Ret Packer 47B2 - 7" 26# H781
-20-0025
Baker FHL 2.992
9,710.3 5,735.9 41.50 NIPPLE 4.500 3 1/2" x 2.913" X-Profile Landing
Nipple, TSH 563 BxP x
TSH X-Profile 2.813
9,737.4 5,756.2 41.27 OVERSHOT 6.030 Baker non sealing Overshot Bowen Bowen 3.500
Top (ftKB)
9,740.0
Set Depth …
9,793.3
Set Depth …
5,798.4
String Max No…
3 1/2
Tubing Description
Tubing – Production
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE-abm
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
9,757.3 5,771.2 41.10 NIPPLE 4.500 CAMCO W-1 SELECTIVE LANDING
NIPPLE
CAMCO W-1 2.812
9,767.4 5,778.8 41.01 SEAL ASSY 4.750 BAKER KBH-22 ANCHOR SEAL
ASSEMBLY
BAKER KBH-22 3.000
9,768.3 5,779.5 41.00 PACKER 5.687 BAKER SABL-3 PERMANENT
PACKER
BAKER SABL-3 3.250
9,783.3 5,790.8 40.87 NIPPLE 4.500 CAMCO D NIPPLE w/2.795" NO GO CAMCO D 2.750
9,792.4 5,797.7 40.80 SOS 4.000 BAKER SHEAR OUT BAKER 2.992
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
9,740.0 5,758.2 41.25 TUBING CUT TUBING JET CUT 1/9/2019 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
3,374.4 2,611.3 62.63 1 GAS LIFT GLV RK 1 1/2 1,259.0 4/8/2023 0.188
6,425.4 4,029.5 62.48 2 GAS LIFT GLV RK 1 1/2 1,249.0 4/8/2023 0.188
7,870.2 4,710.9 61.97 3 GAS LIFT GLV RK 1 1/2 1,236.0 4/8/2023 0.188
9,459.7 5,549.7 43.52 4 GAS LIFT DMY RK 1 1/2 0.0 2/19/2019 0.000
9,579.6 5,638.1 41.80 5 GAS LIFT OV RK 1 1/2 0.0 4/8/2023 0.250
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
1,734.1 1,673.5 31.75 Stage Collar 7.000 HES Cementer HYD563 Halliburto
n
HES 6.276
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
9,866.0 9,875.0 5,853.6 5,860.4 C-4, 2T-22 2/4/2025 6.0 APERF 2 1/8" STRIP GUN,
SHOGUN N.T./S.D.P. 6 SPF
60 DEG.
9,895.0 9,899.0 5,875.7 5,878.7 A-4, 2T-22 2/4/2025 6.0 APERF 2 1/8" STRIP GUN,
SHOGUN N.T./S.D.P. 6 SPF
60 DEG.
9,905.0 9,925.0 5,883.3 5,898.6 A-3, 2T-22 8/31/1995 4.0 IPERF 2 1/8" Enerjet; 180° Ph;
Orient (+/-) 90°
9,954.0 9,970.0 5,920.9 5,933.2 A-2, 2T-22 1/17/2002 6.0 APERF 2.5" HSD PJ Chgs, 60° ph
2T-22, 2/20/2025 11:38:00 AM
Vertical schematic (actual)
PRODUCTION ORIGINAL;
1,748.1-10,183.0
APERF; 9,954.0-9,970.0
IPERF; 9,905.0-9,925.0
APERF; 9,895.0-9,899.0
APERF; 9,866.0-9,875.0
PACKER; 9,768.3
TUBING CUT; 9,740.0
NIPPLE; 9,710.3
PACKER; 9,652.9
GAS LIFT; 9,579.6
GAS LIFT; 9,459.7
GAS LIFT; 7,870.2
GAS LIFT; 6,425.4
SURFACE; 41.0-3,958.4
GAS LIFT; 3,374.4
TIE BACK STRING; 38.6-
1,751.0
CONDUCTOR; 41.0-121.0
HANGER; 36.8
KUP PROD
KB-Grd (ft)
41.00
RR Date
6/25/1995
Other Elev…
2T-22
...
TD
Act Btm (ftKB)
10,193.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
501032022400
Wellbore Status
PROD
Max Angle & MD
Incl (°)
64.98
MD (ftKB)
6,050.00
WELLNAME WELLBORE2T-22
Annotation
Last WO:
End Date
2/20/2019
H2S (ppm)
60
Date
11/20/2015
Comment
SSSV: NONE
ORIGINATED
TRANSMITTAL
DATE: 2/19/2025
ALASKA E-LINE SERVICES
TRANSMITTAL
#: 5279
42260 Kenai Spur Hwy
PO BOX 1481 - Kenai, Alaska 99611 FIELD Kuparuk
PH: (907) 283-7374 FAX: (907) 283-7378
DELIVERABLE DESCRIPTION
TICKET # WELL # API #
LOG
DESCRIPTION
DATE OF
LOG
5279 2T-22 50103202240000 Perf Record 3-Feb-2025
RECIPIENTS
Conoco
DIGITAL FILES PRINTS CD'S
1 FTP Transfer 0 0 USPS
Attn: NSK-69
Richard.E.Elgarico@conocophillips.com 700 G Street
Anchorage, AK 99503
Received
By: Received By:
Signature Signature
AOGCC
DIGITAL FILES PRINTS CD'S
1 ShareFile 0 0 USPS
Attn: Natural Resources Technician II
abby.bell@alaska.gov Alaska Oil & Gas Conservation Commision
aogcc.data@alaska.gov 333 W. 7th Ave, Suite 100 - Anchorage, AK 99501
Received
By: Received By:
Signature Signature
195-086
T40102
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2025.02.19 15:21:12 -09'00'
DNR
DIGITAL FILES PRINTS CD'S
1 SharePoint
Link 0 0 USPS
Attn: Natural Resource Tech II
DOG.Redata@alaska.gov 550 West 7th Ave, Suite #802 - Anchorage, AK 99501
Delivery Method: USPS
Received
By: Received By:
Signature Signature
Please return via e-mail a copy to both:
AR@ake-
line.com AKGGREDTSupport@ConocoPhillips.onmicrosoft.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
HLCEIVED
MAR 2 2 2019
1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Pull Tubing Opera' h
Performed: Suspend ❑ Perforate
❑ Other Stimulate ❑
Alter Casing ❑+ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool
❑ Repair Well B
Re-enter Susp Well ❑ Other: ❑
2. Operator
4. Well Class Before Work:
5. Permit to Drill Number:
Name: ConocoPhillips Alaska, Inc.
Development p
Strafigraphic❑
Exploratory❑
Service❑
195-086
3. Address: P. O. Box 100360, Anchorage,
6. API Number:
Alaska 99510
50-103-20224-00
7. Property Designation (Lease Number):
8, Well
Name and Number: KRU 2T-22
ADL 25568
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Kuparuk River Field / Kuparuk River Oil Pool
11. Present Well Condition Summary:
Total Depth measured 10,193
feet Plugs
measured 9781 feet
true vertical 6,107
feet Junk
measured None feet
Effective Depth measured 9,978
feet Packer
measured 9653, 9768 feet
true vertical 5,940
feet
true vertical 5693, 5780 feet
Casing Length Size
MD
TVD Burst Collapse
CONDUCTOR 80 feet 16
121' MD
121' TVD
SURFACE 3,917 feet 95/81,
3,958' MD
2883' TVD
TIE BACK STRING 1,712 feet 7 "
1,751' MD
1688'TVD
PRODUCTION 8,435 feet 7
10,183' MD
6099' TVD
Perforation depth: Measured depth:
9905-9225. 9954-9970 feet
True Vertical depth:
5883-5899. 5920-5933 feet
Tubing (size, grade, measured and true vertical depth)
3.5 "
L-80 9,793' MD 5,798' TVD
Packers and SSSV (type, measured and true vertical depth)
PACKER - FHL RET PACKER 47132 9,653' MD 5,693' TVD
PACKER - BAKER SABL-3 PERM. PACKER 9,768' MD 5,780' TVD
SSSV -NONE
12. Stimulation or cement squeeze summary:
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure:
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: SHUT -N
-
- - -
Subsequent to operation: SHUT-IN
-
- - -
14. Attachments (required per 20 AAC 25.070, 25.077, 825.283)
15. Well Class after work:
Daily Report of Well Operations O
Exploratory ❑
Development 21 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run Cl
16. Well Status after work:
Oil O Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ >USP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct
to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
318-484
Contact Name. Dusty Ward
Authorized Name: Dusty Ward
Contact Email: Dusty.Ward@cop.com
Authorized Tile: Sr. Wells Engineer
Authorized Signature:
'77—a-g(lwl
Date
1 n contact Phone: (907) 265-6531
un-07UVISMOT R MAR ZO(
1
ConocoPhillips
AasKa. Inc.
KUP PROD WELL -NAME 2T-22
RIVER UNIT
NONE
w0:
WELLBORE 2T-22
ST.1].9^d1 S995fi.3zAM
Last Tag
NNIANI =ec So l
aNmdmn
prem(nKel
End Ezm won..
Lon Mosey
Last Tag'. RKB
I 9,916.0
IdSeA2018 2T-22
learges,
Last Rev Reason
HANGER, 36.9
1
Mnodtian
EnEDad Wellsom
Gooled By
Rev Reason'. Installed Gas Lill Design 2/2512019 27-22
zembaej
Casing Strings
Cminiteempnon
oO (in) men)
Top(MID See Eepm (AINS) See pepin PVD), MLen p... G,ese
Toprnrtas
CONDUCTOR
16 1506
41.0 121.0 121.0 62.58 Hd
WELDED
i.n CONDUCTOR, 41 au' 0
Cal Deswanden
SURFACE
00(In) E)pin
9618 8.70
Rea ave) Bet Oeom IRKED sm,E mIN01... WYLen g... Grass
41.0 3,9564 2,883.0 40M LF
Top TOrtas
BTC
Dasdp 13-lpmen
.0 (In) ID lin)
Top MKel Be am e1K01 Bel Deem IN61....n11... GrWe
Top Tpddl
TIE BACK STRING
7 6.28
38.6 1,7510 1,68)8 2800 L-80
HydI
cae, ne ")men
PRODUCTION
ORIGINAL
Opllnl Ip llnl
7 6.28
top 1X1(81 9N DegF non.) Bel Depal II sSN WIILen 11 InW
1,7460 10,183.0 6,0992 26.00 L-80
Top Thread
BTCM
PmJV F141-UwJ; 376
x,150.01 m.371WNDS6
Tubing Strings
Rising Dec"Intin
Sema Ma..IDIIn)
TOPmK-
set Depth m..
an"Re'L..
WtONX)
Gose
iep conn«eon
TUBING GAS
3112
2.99
36.8
9,]450
-Oe
5)62.0
9.30
L-60
HYD563
INJECTION
Completion Details
Top RNID)
Top Ins'
Neminal
TIE SACK STRING. daa
TOP MK81 (XKB)
p) I Idm Des
Com
10(m)
17510
WA 36.8
0.00 HANGER
FMC Gen IV TUI Pointer "x 3 pin x jI
dud 2.992
bem)1v73.54' 3-12' HYD5639.3e L-00 pupil
9,63. 5.682.7
1 PBR
PBR8040116811904 4'ESDS ll. -sealleng0
2992
wsunranA4
96529 5,693.0
41.58 PACKER
FHL Ret Pandoor 4]82-7"26k H781-20-0025
2,992
9,]103 5,735.9
41.50 NIPPLE
3112"x2.91S'X-Profle Landing Nipple, TSH 563 Ben x
2,813
9,7374 57562
4127 OVERSHOT
Baker non sealing Overshot
3.500
TUM,l9 Desertion
3--i.-M. 10 (In)
Top inns) Sn Depth nl- Se, peplh RrvD) 6.. Wi9w6 Grate
Top ConnMlon
TUBING ORIGINAL
312 299
9]40.0 9]93.3 5,]964 930 L-80
EUEabm
SGRFA a 41,0406 �
Completion Debits
Anmlw Few -a sdmA z+..
To�tIK961
ro
Nominal
B.Tw D; v19•Ala
Topples)
f'nd Idm Cec
Com
On)
wsUFT; g4z54
9,79 .3 5p12
41.10 NIPPLE
CAMCO W -)SELECTIVE LANDING NIPPLE
2.812
9.7674 5,]]8.8
41.01 SEAL ABY
BAKER KBH-22 ANCHOR SEAL ASSEMBLY
3.000
9.7683 5]]9.5
41.00 PACKER
BAKER SAB43 PERMANENT PACKER
3.250
GASUFT', 7A702
9,783.3 5,]90.8
4087 NIPPLE
CAMPO D NIPPLE w2 TIES' NO GO
2.750
91924 5,191,7
40.80 SOS
BAKER SHEAR OUT
2.992
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top RVel
Topmd
..UFT5R
;g4]
To UKKRD I
r) ped
Com Ron
Del. ID (in)
9,7400 5,758.2
41.25 TUBING CUT TUBING JET CUT 1192019 0000
9,7809 5,789.0
40.89 PLUG
1.81- CA -2 PLUG(OAL=26'7 41272018
0.000
9,7830 SINS
40.87 NIPPLE
AZ,o Dx 1.81'Uns' REDUCER(OAL=2J') 9112/2016
1.81
GASBR;6sn's
REDUCER
Perforations 8 Slots
sent
ane
FBR.98E.a
Top RTv01
BM (NDI
(eM1ObIR
PACKER; 86528
Top pIMO) BImRPo(81
(11K01
MIKE)
LlnMes Sn„e
Dad
)
Ten
COm
9.9050 9,925.0
5,8833
5,898.6
A-3, 2T-22
813111995
4.0 IPERF
2
16 Enerjet: P',
Oriem (41-)
90°
NIPPLE: 97109
9,9540 9,970.0
5,9209
5,9332
A-227-22
V1L2W2
6.0 APERF
25"HSD PJ
Chgs, 0 pM1
Notes: General S Safety
End pare
Allemande
311412019 NOTE:
VIEW SCHEMATIC A'Alaska
Schemawell).0
Ran.CDT; 9ia0,0
OYER.HOT ),Ts74
NIPPLE,
PACKER;9]W.9
PL60; 9,]&1.9
NVPIF;'7RER
NIPPLE REODLER, 9>ala
sOs; 1114
IPERR;....UpI
APERF, 96,I,Teanii
PRODGCTION DRIGINA-
1,TIR1-16,tai.0
Operations Summary (with Timelog Depths)
2T-22
1W
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Time
End Time
Our (hr)
Phase
Op Code
AIrvity Code
Time P-T-X
Operation
Start Depth
(ftKB)
End Depih(flKB)
1/14/2019
1/15/2019
12.00
MIRU
RPCOMP
MOB
P
Move Rig F/ 2T-27 t/ 2T-22
0.0
0.0
12:00
00:00
1/15/2019
1/15/2019
4.00
MIRU
MOVE
MOB
T
Continue to move rig f/ 27-27 t/ 2t 22
00:00
0400
Sub Base is spotted over well 2T-22
1/15/2019
1/16/2019
20.00
MIRU
MOVE
MOB
T
Standy due to phase 3 conditions
04:00
0000
1/16/2019
1/16/2019
1.00
MIRU
MOVE
MOB
T
Standby due to Phase 3 conditions.
00:00
01:00
1/16/2019
1/16/2019
10.00
MIRU
MOVE
RURD
P
Phase 3 conditions lifted. Continue
01:00
11:00
rigging up. Install plywood around
cellar and wheel rooms for walkways.
Install herculite secondary
containment. Spot pit complex to sub.
Install matts. Spot and set up cuttings
pits tank. Connect steam lines, hoses
and pit interconnects. Berm around
rig. Spot smoke shack, enviirovac,
mud shac. Prep cellar and tie in hard
line for kill well operations. Take on
fluid in pits to prepare 9.3 ppg NaCl kill
weight fluid.
Note: Rig accepted at 0900 hours.
1/16/2019
1/16/2019
0.50
COMPZN
WELCTL
PRTS
P
IA pressure approximately 225 psi.
11:00
11:30
Isolate IA from hard line and pump
through filling line back to tiger tank.
Pressure test line to approximately
500/2000 psi. Test good. Attempt to
bleed of pressure from IA, unable to
bleed off pressure, diesel flow
returning to tiger tank. Shut well IA in.
Blow down line.
Offline: Continue to dilute 9.8 ppg
KWF to 9.3 ppg KWF
1/16/2019
1/16/2019
1.00
COMPZN
WELCTL
MPSP
P
Rig up FMC lubricator. Pressure test
11:30
12:30
lubricator to 2000 psi for 5 minutes.
Test good. Pull BPV. Secure well
closing in lower master and swab
valve.
Offline: Continue to dilute 9.8 ppg
KWF to 9.3 ppg KWF in preparation to
kill well.
1/16/2019
1/16/2019
2.00
COMPZN
WELCTL
KLWL
P
Continue diluting 9.8 ppg fluid to 9.3
12:30
14:30
ppg KWF. Dilute a total volume of
approximately 570 bbls. Build
scaffolding around cellar area. PJSM
on well kill operations.
1/16/2019
1/16/2019
3.50
COMPZN
WELCTL
KLWL
P
Observed 225 psi of pressure on IA.
14:30
18:00
Attempt to bleed off pressure,
pressure would not bleed, diesel
returns to tiger tank. Start pumping
down tubing with 9.3ppg NaCL KWF
@ 3 bbls with 280 - 540 psi on tubing
and open choke 20% and take diesel
returns though choke manifold to flow
back tank after approximately 350 bbls
around, observed 9.3 ppg KWF at
manifold with gas cut mud. Pump an
additional 50 this of 9.3 ppg KWF
around and shut pump down. Shut
well in and monitor. Blow down hard
line and choke manifold.
1/16/2019
1/16/2019
1.00
COMPZN
RPCOMP
PRTS
P
Set FMC BEV and Test to 1000 psi f/
18:00
19:00
below 5 mins All good
Page 1138
Report
Printed:
2/21/2019
o Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Steri Depth
Start Time
Emi Time
Dur(m)
Phase
Op Code
Activity Cone
Time P -T -X
Operation
(ftKB)
End Depth ^13)
1/16/2019
1/17/2019
5.00
COMPZN
RPCOMP
NUND
P
RID lines blow down same and N/D
19:00
00:00
FMC Tree and N/U BOP
1/17/2019
1/17/2019
3.00
COMPZN
RPCOMP
NUND
P
Continue to nipple 13 5/8" BOP stack
00:00
03:00
and associated hydraulic hoses.
Install turn buckles, and riser. Offline
load drill pipe in shed and strap.
1/17/2019
1/17/2019
5.00
COMPZN
RPCOMP
SVRG
P
Perform BOP maintmance inspection
03:00
08:00
open all ram doors and inspect all
rams as per AOGCC agreement.
1/17/2019
1/17/2019
2.50
COMPZN
RPCOMP
OTHR
P
Pick up blanking plug, and install in
08:00
10:30
well head. Make up TAW to test joint
and make up to top drive. Rig up
hoses to top drive and choke. Fill BOP
slack, surface lines and choke
manifold purging air out of system.
1/17/2019
1/17/2019
6.00
COMPZN
RPCOMP
BOPE
P
Pressure lest BOPE 250/2500 PSI for
10:30
16:30
5 Min each as per test procedure.
AOGCC rep Matthew Herrera waived
witness.
1) Blind Rams, CMV 1. 2. 3. 16,
Demco Kill, IBOP
2) CMV 4, 5, 6, HCR Kill, Lower Kelly
Valve
3) CMV 7, 8, 9, Manual Kill, HT -38
FOSV
4) Super Choke, Manual Choke
5)Annular, CMV 10, 11, HT-381BOP
6) UVBR, CMV 13, 13, 15
7) CMV 14
8) HCR Choke
9) Manual Choke
10) LVBR
Accumulator Drawdown test
Lay down test joint and blow down
choke and lines.
1/17/2019
1/17/2019
1.00
COMPZN
RPCOMP
RURD
P
RID test equipment and Pull test dart
16:30
17:30
and BPV and LID same
1/17/2019
1/17/2019
1.00
COMPZN
RPCOMP
PULL
P
RIH w/landing joint BOLDS and Pulled
17:30
18:30
Hanger to Floor PUW 100 U 135K
Pulled free 20' up PUW 95K
1/17/2019
1/17/2019
1.50
COMPZN
RPCOMP
PUTB
P
CBU @ 5 BBls w/ 470 PSI No fluid
18:30
20:00
losses Shut down monitor well 15
mins all good
1/17/2019
1/1812019
4.00
COMPZN
RPCOMP
PULD
P
POOH and STD Back 4 stands in
20:00
00:00
derick 375' 3 1/2" Tubing become
corkscrewed on std 5 could not Std
Back start LID 3 1/2" Tubing in pipe
shed
1/18/2019
1/18/2019
4.50
COMPZN
RPCOMP
PULD
T
Continue LID 31/2" EUE tubing
00:00
04:30
corkscrewed pipe @ 1571' out of
hole. PUWT 85K and Joint 50 PUWT
35K lost String wt. Continued to LID
12 more Joint TOT joint LID 62 + 6'
pup Joint. Back out of GLM # 6 ToT
LID 1979.67'. GLM was 378' below
surface when string parted. Top pup
backed out of GLM # 6 with no over
pull
1/18/2019
1/18/2019
7.50
COMPZN
RPCOMP
PULD
T
RIH with 4 stands of 3 1/2" tubing out
04:30
12:00
of derrick. POOH with 3 1/2" tubing
laying out in singles. Clean rig floor.
Prepare 3 1/2" drill pipe and 4 3/4" drill
collars. Load and strap 3 1/2" HT 38
drill pipe and BHA# 1 Baker tools.
Page 2138 Report Printed; 2/2112019
Operations Summary (with Timelog Depths)
Awl
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Depth
Stan Time
End Time
our (h)
Phase
op Cade
Activity Code
Time P-T-X
Operatic,
(W13)
End Depth (ftKB)
1/18/2019
1/18/2019
3.00
COMPZN
RPCOMP
BHAH
T
Pick Baker Hughes Fishing BHA#1
12:00
15:00
as follows: 5 7/8" Overshot (4 3/8"
grapples), 61/8" string mill, bumper
sub, oil jars, 9- 4 3/4" Drill collars,
cross over and 3 1/2" HT38 drill pipe.
While picking up BHA unable to pass
5 7/8" overshot through wellhead.
Making several attempts to stab into
wellhead and rotate pipe,
unsuccessful. Lay Down Fishing BHA
#1.
1/18/2019
1/18/2019
1.00
COMPZN
RPCOMP
BHAH
T
Pick 3 1/2" mule shoe and 3 1/2"
15:00
16:00
HT38 drill pipe in singles. RIH to
perform drift run and attempt to tag top
of fish while waiting on E-line to set 3
3/8' IBP. 3 1/2" tool joint OD 5.2".
Able to RIH to approximately 63.5' and
tagging up. Unable to work through
obstruction. POOH and lay down
mule shoe and 2 singles.
1/18/2019
1/18/2019
5.00
COMPZN
RPCOMP
PACK
T
Wait on Alaska E-line to set 3 3/8" IBP.
16:00
21:00
R/U pollard E-line and RIH w/ RBP
Tag up (41403' p/u and space out to
392' and set POOH and R/D pollard a-
line
1/18/2019
1/18/2019
0.50
COMPZN
RPCOMP
PRTS
P
Test RBP and casing U 2000 psi 5
21:00
21:30
mins all good
1/18/2019
1/19/2019
2.50
COMPZN
RPCOMP
NUND
P
N/D BOP and prep f/ Hydratight
21:30
00:00
procedure
1/19/2019
1/19/2019
10.00
COMPZN
RPCOMP
PUTB
P
PJSM. Rig up Hydra Tight equipment
00:00
10:00
and run in rods and allow 7" casing to
grow. During occasional cycles casing
would jump and psilgrowth would
increase. Casing decompressing from
buckling as well as releasing torsional
strain (uncork-screwing) slightly. After
34 cycles casing grew approximately
20 1/2". Stay rigged up and allow
and monitor casing without cycling,
observed residual growth of 1".
Continued to monitor further to ensure
casing growth complete. Total casing
growth from flange to flange
measurement of 21 1/2". Rig down
Hydra Tight equipment and remove 7"
tubing head spool.
1/19/2019
1119/2019
4.00
COMPZN
RPCOMP
CUTP
P
Perform rough cut and cut
10:00
14:00
approximately 11" of 7" casing off.
Remove 7" packoff. Pick up Baker 7"
spear engage spear into 7" stump.
Pick up on 7" spear with 100kslring
weight( block wt 30K) and stretch 7"
casing an additional 12.5". Slack off
weight and set casing slips with 50k
overfull. Total casing removed 34".
Lay down spear
1/19/2019
1/19/2019
1.00
COMPZN
RPCOMP
WWSP
P
Wachs cut 7" excess casing. Install
14:00
15:00
packoff and energize pack off with 200
ftlbs per compression bolt.
1/19/2019
1/19/2019
5.50
COMPZN
RPCOMP
NUND
P
Nipple up 11" 3M x 13 5/8" 5M DSA.
15:00
20:30
Rig up 13 5/8" BOPE. Change out
lower VBR's to 7" casing rams.
1/19/2019
1/19/2019
2.00
COMPZN
RPCOMP
ROPE
P
M/U 7" test joint and test 7" rams U
20:30
22:30
250/2500 5 mins each Allgood RID
test joint and clean up floor and prep
f/ slick line
Page 3138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
start Time
End Time
Dis (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth(ftKB)
1/19/2019
1/20/2019
1.50
COMPZN
RPCOMP
SLKL
P
PJSM R/U Slick line M/U Baker over
22:30
00:00
shot and RIH
1/20/2019
1/20/2019
2.50
COMPZN
RPCOMP
SLKL
P
RIH w/ slick line with 5.37 OD over
00:00
02:30
shot and latch on to RBP @ 392',Pull
release RBP and POOH UD same
M/U GR 5.95 Drift RIH U 398' and tag
up No go POOH and M/U 3.50 GR
Drift RIH T/ 1988' Tag lop of fish
1988'w/ WLM POOH and RID Slick
line unit
1/20/2019
1/20/2019
3.00
COMPZN
RPCOMP
WAIT
P
Wait on pollard E -Line unit for CBL
02:30
05:30
logs
1/20/2019
1/20/2019
4.50
COMPZN
RPCOMP
ELOG
P
PJSM with crew and Alaska -E -Line.
05:30
10:00
RU E -line logging unit. Attempt to RIH
with CBL logging tools, unable to get
past 403'. Losing all tension at 403',
able to pick back up without any over
pull, regain normal tension on line.
Attempt several times, largest OD on
tool is 3.25". POOH and lay down
gamma ray tool, shortening tool string
length. Attempt to RIH with shortened
tool string, unable to get past 403'.
Decision made to POOH and run
Halliburton 40 arm caliper log while
wailing on SLB 1 11/16" memory CBL
tool. Successfully made it passed
hang up depth of 403', Max tool OD
2.75", more flexible tool string. Log
from surface to 1982' MD WLM.
POOH and re -log from surface to 600'
MD WLM, re -log trouble area.
NOTE: Caliper log indicated damage
in joints 9 and 10, 49.7% and 100%
damage respectively (397'). Joint 10
appears to have a split in casing.
Minimum ID recorded for 7" is 5.59".
Remainder of casing in very good
condition with less than 20% damage.
1/20/2019
1/20/2019
3.00
COMPZN
RPCOMP
WAIT
P
Wait on SLB 1 11/16" Memory CBL
10:00
13:00
tools and Baker inflatable bridge plugs
to arrive on location.
1/20/2019
1/20/2019
10.00
COMPZN
RPCOMP
ELNE
P
M/U SLB CBL and RIH t/ 1984' and
13:00
23:00
log F/ 1984' to surface RID CBL and
M/U Baker inflatable RBP RIH U 1974'
and set RPB rQ 1974' POOH RID
Pollard E -line
1202019
1/21/2019
1.00
COMPZN
RPCOMP
PRTS
P
R/U and Test 7" casing and RBP t/
23:00
00:00
1
1
12000
psi All good
1/21/2019
1/21/2019
2.00
COMPZN
RPCOMP
SHAH
P
M/U Baker mule shoe guide on 3 1/2"
00:00
02:00
HT- 38 and P/U singles out of pipe
shed Tag up 385' No go with 5.0 OD
P/U 10'
1/21/2019
1/21/2019
2.50
COMPZN
RPCOMP
OTHR
P
R/U and Dump Sand in 31/2"" HT -38
02:00
04:30
100' on Top of RBP @ 1974' POOH
and stand back 3 1/2"" DP
Page 4138 Report Printed: 2/21/2019
Aap6_ Operations Summary (with Timelog Depths)
+ zj;
ML
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Time
End Time
Wr(hd
Phase
Op Cede
Acsaty Code
Time P -T -X
Operation
Stan Depth
(ftKB)
End Depth(ftKB)
1/21/2019
1/21/2019
5.00
COMPZN
RPCOMP
BHAH
P
Prep to M/U Baker mechanical Cutter
04:30
09:30
BHA and P/U 2 7/8"" Pac HT DP
Attempt RIH with Baker Hughes 4 1/2"
mechanical cutler. Tagging up at 395'.
Attempt several times to work through
spot but unable to. Lay down 4 1/2"
cutter and 13 stands of 2 7/8" work
string. Pick up 3 3/4" mechanical
cutter and 2 7/8" work string. Unable
to get past hang up depth of 395'. Lay
out 3 3/4" cutter and 2 7/8" work
string.
1/21/2019
1/21/2019
9.00
COMPZN
RPCOMP
BHAH
P
Pick up Baker Hughes Swedge BHA
09:30
18:30
assembly as follows: Swedge, Bit
Sub, Bumper Sub, Oil Jars, 12- 4 3/4"
drill collars and crossover. Attempt to
enlarge 7" casing ID large enough to
pass 3 3/4" mechanical cutter past
hang up depth of 395'. Unable to
make enlarge 7" casing ID. Lay down
Swedging assembly.
1/21/2019
1/22/2019
5.50
COMPZN
RPCOMP
SHAH
P
Pick up Baker Hughes milling
18:30
0000
assembly to enlarge 7" casing ID.
RIH and mill out buckled casing at
390'. Mill V 399'
1/22/2019
1/22/2019
1.00
COMPZN
RPCOMP
MILL
P
Continue milling out buckled casing at
00:00
01:00
390', Mill V 399' no down movement
observed. During milling operations
observed diesel returns to surface.
During milling operations milled
through 7" casing.
1/22/2019
1/2212019
1.00
COMPZN
RPCOMP
TRIP
P
POOH and check mill. When on
01:00
02:00
surface observed the mill had twisted
off at the top of the fishing neck. Bull
nose and 5 3/4" watermelon mill left in
hole, approximately 4.75' of fish in
hole.
1/22/2019
1/22/2019
1.00
COMPZN
RPCOMP
BHAH
T
M/U BHA# 8 w/ Baker O/S 5 3/4" w/
02:00
03:00
31/2"grapple
1/22/2019
1/22/2019
11.00
COMPZN
RPCOMP
CIRC
P
R/U to O.A to Bleed Tank and test
03:00
14:00
lines to 2000 psi and pump 9.3 ppg
KWF down 7" casing with blinds shut
via kill line taking returns up the OA to
flowback tank. Observed gas and
diesel back to flowback tank. Well out
of balance, well u -tubing. Pumped
approximately 200 bbls of 9.3 ppg to
displace/swap well from arctic
pack/diesel. Allow well to u -tube to
equalize, bleeding off gas to bleed
trailer. Shut OA in 5 times and each
cycle pressure built up between 40-60
psi. Bleed well off to bleed back tank
from 50 psi to 10 psi.
1/22/2019
1/22/2019
0.50
COMPZN
RPCOMP
SFTY
P
Safety stand down with all crew
14:00
14:30
members and 3rd party service
providers on location. Discussed
January Incident Review and Learning
Opportunities Presentation.
Page 5138 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
stadoepth
(fil(e)
End Depth (W)
1/22/2019
1/22/2019
4.50
COMPZN
RPCOMP
OWFF
P
Continue to bleed OA to bleed off
14:30
19:00
tank. Bleed well off completely to 0
psi. Observe well for 30 mins. No
pressure or visual flow observed.
Open blind rams and observe diesel in
7" casing and pressure build up to 45
psi on OA. Shut blind rams and pump
20 bbls of 9.3 ppg KWF down 7"
casing up the OA to flowback tank. No
pressure or flow observed. Monitor
well.
1/22/2019
1/23/2019
5.00
COMPZN
RPCOMP
OWFF
P
Monitor well, open up. Decision was
19:00
00:00
made to test blind rams, AOGCC was
notified. PU 7" retrievable test packer.
RIH, set at 99'. POOH. Shut blind
rams, test 7", and blinds to 250psi low
and 2500psi high, 5min each, charted.
Open blinds, RIH, release packer,
allow to relax. POOH, LD packer.
1/23/2019
1/23/2019
7.00
COMPZN
RPCOMP
FISH
T
MU 5 3/4" overshot, RIH, tag fish at
00:00
07:00
395', had good indication it tagged,
engaged, some over pull. Slack Off
several limes, tag each time. POOH,
no fish. Marks on outside of overshot,
no indication fish was swallowed. MU
smaller overshot 4 11/16", RIH, tag
fish at 395' pumping and rotating set
down 10K, PU 1 O over pull, pop free
several times. POOH, no fish. Edge
of overshot was rolled over and wom,
no indication fish was swallowed. MU
5 5/8" BOT box tap, RIH.
1/23/2019
1/23/2019
2.00
COMPZN
RPCOMP
SHAH
T
Pick up 2 7/8" drill pipe and perform
07:00
09:00
drift run. Attempt to tag top of
fish/verify fish depth. RIH and tag
obstruction at 395' MD. Lay down 2
7/8" drill pipe.
1/23/2019
1/23/2019
4.50
COMPZN
RPCOMP
WAIT
T
Wait on Baker Hughes fishing tools
09:00
1330
(junk mill) and drill collars (3 1/8").
Clean rig and perform maintenance.
1/23/2019
1/23/2019
2.50
COMPZN
RPCOMP
BHAH
T
Prep 3 5/8" junk mill BHA. Pick up
13:30
16:00
Baker fishing assembly as follows: 3
5/8" junk mill, 12 -3 1/8" drill collars,
and crossover.
1/23/2019
1/23/2019
1.00
COMPZN
RPCOMP
JAR
T
RIH with 3 5/8" junk mill assembly and
16:00
17:00
attempting to free fish. Continue
working pipe stacking approximately 5
-8k WOB to fish at 395'MD.
Successfully able to free fish from
restricted spot at 395'.
1/23/2019
1/23/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with 3 1/2" drill pipe, continuing to
17:00
17:30
push fish to bottom. Unable to pass 3
1/2" tool joint through restricted 7"
casing ID at 395'.
1/23/2019
1/24/2019
6.50
COMPZN
RPCOMP
TRIP
T
POOH racking back 3 1/2" drill pipe in
17:30
00:00
derrick. Pick up 2 7/8" drill pipe
singles, Passed through restriction,
MU top drive and push three jts
through until sufficient weight to fall
through. Continue to push fish to top
of sand at 1828'. Set down 10K to
confirm bottom.
1/24/2019
1/24/2019
3.50
COMPZN
RPCOMP
TRIP
T
Monitor well. POOH LD 2 7/8" DP and
00:00
03:30
junk mill BHA.
1/24/2019
1/24/2019
2.00
COMPZN
RPCOMP
TRIP
T
MU 4 3/4" string mill BHA. RIH PU 2
03:30
0530
1
7/8" DP
Page 6138
Report
Printed:
2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
start Tme
End Time
our (hr)
Phase
op Code
ActivM Code
Time P -T -X
Operation
dtKB)
End Depth mKB)
1/24/2019
1/24/2019
0.50
COMPZN
RPCOMP
MILL
T
Make up stand of 3 1/2" drill pipe and
05:30
06:00
RIH. Tag 7" casing ID restriction at
396' MD. Establish milling parameters
at 3 bpm, 780 psi SPP, 40 RPM, Off
BTM TO 650 ftlbs, and On BTM TO
800 Ribs.
1/24/2019
1/2412019
0.50
COMPZN
RPCOMP
SVRG
P
Service top drive, grease top drive and
06:00
06:30
tighten black jack.
1/24/2019
1/24/2019
7.00
COMPZN
RPCOMP
MILL
T
Continue milling 7" casing restriction
06:30
13:30
from 396' to 400.5' MD. At 3bpm, 780
psi SPP, 40 RPM and torque ranging
from 800 - 1400 ftlbs. Lightly
feathering mill with 1-3 k lbs WOB. At
approximately 400' MD torque became
erratic. Decision made to POOH.
1/24/2019
1/24/2019
1.50
COMPZN
RPCOMP
TRIP
T
Decision made to POOH due to erratic
13:30
15:00
torque swings and not making any
forward progress. POOH, laying down
3 1/2" drill collars and 2 7/8" drill pipe.
Inspect mill. Milled showed wear on
the ribs about 1/2 way.
1/24/2019
1/24/2019
1.50
COMPZN
RPCOMP
WAIT
T
Wait on string mill from Baker to be
15:00
16:30
built.
1/24/2019
1/2412019
1.00
COMPZN
RPCOMP
TRIP
T
PU 4 5/8" string mill with cutting
16:30
17:30
structure on full length of ribs, RIH PU
DC/DP to 395ft.
1/24/2019
1/24/2019
3.00
COMPZN
RPCOMP
MILL
T
Establish milling pattern, 40RPM,
17:30
20:30
3bpm 780 SPP. Mill 7" casing
restriction from 400.5' to 410' with
torque ranging from 1000 to 1300
ftlbs. Lightly feathering mill with 1-3k
lbs WOB.
1/24/2019
1/2412019
1.50
COMPZN
RPCOMP
REAM
T
Back ream and ream down 40RPM,
20:30
22:00
3bpm with torque ranging from 800-
130001bs. Work string mill up and
down through restriction until torque
normalizes.
1/24/2019
1/25/2019
2.00
COMPZN
RPCOMP
TRIP
T
RIH to 540'to drift for casing cutter.
22:00
00:00
Prep floor. POOH LD.
1/25/2019
1/25/2019
2.00
COMPZN
RPCOMP
TRIP
P
MU casing cutter BHA. RIH to cut
00:00
02:00
depth.
1/25/2019
1/25/2019
1.50
COMPZN
RPCOMP
CUTP
P
Wash down 5bpm to locate collar, PU
02:00
03:30
20' above collar to 419'. Cut casing
60rpm, 5bpm 1850psi SPP, 1080 ft Ib.
OA 35 Psi. Not seeing expected drop
in torque or pressure, SD pump, PU.
Ease in hole pumping 5bpm to tag
cut, saw dogs tag, Begin rotation
again 60rpm. Irregular readings,
torque not falling off, rotation noise
sounds like cut is incomplete, decided
to POOH and check cutter dogs.
1/25/2019
1/2512019
1.50
COMPZN
RPCOMP
TRIP
P
POOH to check cutter. Found one
03:30
05:00
cutter sheared off, approximately 1" x
1/2" piece of knife. Laydown BHA.
1/25/2019
1/2512019
1.00
COMPZN
RPCOMP
RURD
P
Rig up to circulate down 7" casing.
05:00
06:00
1/25/2019
1/25/2019
1.00
COMPZN
RPCOMP
PULD
P
Pick up 7" casing spear with one joint
06:00
07:00
of 3 1/2" drill pipe. Engage spear into
7" casing pull on 7" casing with 135k
on weight indicator. Casing pulled
free with approximately 90 k over pull.
Page 7138 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
startrim
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(W)
End Depth (W)
1/25/2019
1/25/2019
5.00
COMPZN
RPCOMP
CIRC
P
Circulate 50 bbls diesel at 140 deg F
07:00
12:00
down the 7" casing and taking returns
up the OA to the flow back tank. Allow
diesel to soak for 1 hour. Pump 140
deg 9.3 ppg brine at 1.5 bpm,
displacing diesel out of the OA.
Continue pumping until all diesel
displaced and 9.3 ppg brine observed
at surface. Allow well to balance.
Observe well for 30 mins. No flow
observed.
1/25/2019
1/25/2019
3.00
COMPZN
RPCOMP
NUND
P
Break 13 5/8" BOP stack on the
12:00
15:00
connection at the 13 518" DSA. Lift
stack and secure. Remove 7" Casing
slips. Lower stack back on to DSA
and nipple back up.
1/25/2019
1/25/2019
0.50
COMPZN
RPCOMP
PULD
P
Lay down 7" casing, spear and
15:00
15:30
remove 7" casing packoff.
1/25/2019
1/25/2019
2.50
COMPZN
RPCOMP
PULD
P
POOH with 7" rasing from cut at
15:30
18:00
approximately 419' MD to surface.
Strapping and tallying all 7" casing
joints. Found last joint parted at the
connection, recovered 367.89' of pipe
(8 full joints) left in hole above cut
51.13'.
1/25/2019
1125/2019
1.50
COMPZN
RPCOMP
BOPE
P
Clear floor of 7" handling tools. PU
18:00
19:30
handling joint and test plug, set in
wellhead. Test BOP/wellhead
connection to 500psi for 5mmutes.
Pull test plug. Run wear ring.
1/25/2019
1/25/2019
1.50
COMPZN
RPCOMP
BHAH
P
Clear floor, prepare to TIH, RU Wfd
19:30
21:00
tongs, move pipe in the pipe shed. Re
-dress casing cutter tool. MU 3 3/4"
casing cutter BHA.
1/25/2019
1/25/2019
1.00
COMPZN
RPCOMP
TRIP
P
TIH to cut depth, saw top of 7", fell
21:00
22:00
1
1
through.
1125/2019
1/25/2019
1.00
COMPZN
RPCOMP
CUTP
P
Bring rotary on, 60rpm, 900ftib torque,
22:00
23:00
bring pump on 500psi SPP 3bpm. Cut
7" casing at 424' torque ranging from
1100 to 1300ft1b, 60rpm, 4bpm,
1050psi SPP. After 31 min pump
pressure fell off 100psi and torque fell
off to 970ftlb. PU, SO pumping,
confirmed cut by tagging stub with
cutler.
1/25/2019
1/26/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH to BHA.
23:00
00:00
1/26/2019
1/26/2019
1.00
COMPZN
RPCOMP
BHAH
P
LD cutter BHA. Knives show good
00:00
01:00
indication of a cut.
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
SVRG
P
Rig maint. Grease top drive.
01:00
01:30
1/26/2019
1/26/2019
2.00
COMPZN
RPCOMP
BHAH
P
PU spear BHA
01:30
03:30
1/26/2019
1/26/2019
2.50
COMPZN
RPCOMP
TRIP
P
TIH w/ spear, tagged up at 363',
03:30
06:00
worked pipe to 368', restriction in 9
5/8" preventing spear from reaching
top of 7" fish. POOH. Found sign of
wear on 6-3/4" stop ring. Lay down 7"
spear.
1/26/2019
1/26/2019
2.50
COMPZN
RPCOMP
BHAH
P
Pick up 7 1/4" string mill. RIH with mill
06:00
08:30
to drift well 9 5/8" casing. Tagged up
at 396' md, TOF.
1/26/2019
1/26/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH and lay down string mill.
08:30
09:30
Page 8138 ReportPrinted: 2/2112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Time
End Time
Dur hr)
Phase
Op Code
ActiOy Corte
Time P -T -X
Operation
Start Depth
(ftKB)
End Depth(%KB)
1/26/2019
1/26/2019
1.00
COMPZN
RPCOMP
BHAH
P
Pick up 8 1/2" string mill.
09:30
10:30
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH and tag up at 353' md. Establish
10:30
1100
milling parameters at 5 bpm, 40 psi
SPP, 60 RPM, and 900 ftlbs off bottom
torque.
1/26/2019
1/26/2019
2.00
COMPZN
RPCOMP
7T -HR
P
Due to pump pressure being 40 psi at
11:00
1300
5 bpm, troubleshoot SPP No
indication on surface of any issues
with mud pumps. POOH to inspect
tools. No issue with tools at surface.
Pump through BHA at surface and no
issues observed.
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
TRIP
P
Run back in hole with 8 1/2" mill.
13:00
13:30
1/26/2019
1/26/2019
3.00
COMPZN
RPCOMP
MILL
P
Begin milling operations at 353' md.
13:30
1630
Up and down weight 37k. Establish
milling parameters at: 4 bpm, 50 psi
SPP, 60 RPM, 900 ftlbs off bottom
torque, and 3500 ftlbs on bottom
torque. Mill from 350' and to 353.5'md.
Stall with tQ set at 12K. Attempt to
PU, mill stuck, jar mill free at 100k up
wt. Mill free.
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH
16:30
1700
1/26/2019
1/26/2019
2.00
COMPZN
RPCOMP
BHAH
P
LD BHA. BHA showed signs of
17:00
19:00
rubbing in several locations. MU BOT
7 1/4" string mill BHA.
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
TRIP
P
TIH, to 348'md. RIH, watching for
19:00
19:30
restriction. Set down 5K at 354'md.
1/26/2019
1/26/2019
1.00
COMPZN
RPCOMP
MILL
P
PU to 348', bring pumps on 6bpm,
19:30
20:30
178psi SPP, 77rpm 1000ftib. Erratic
DP movement, wobble. Mill down to
361' pumping 6bpm, 78 rpm with
torque ranging 1100-1300ftib, spiking
to 2500ft1b. Monitor shakers for sand,
returns for losses. RIH tag up at 395'.
SD rotary, drift 9 5/8" pumping 6bpm
past restriction three times with only
slight bobbles on weight indicator.
1/26/2019
1/26/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH 71/4" mill.
20:30
2100
1/26/2019
1/27/2019
3.00
COMPZN
RPCOMP
BHAH
P
LD 7 1/4" mill. Found mill to have
21:00
00:00
broken cutters and wear on the
leading and tail edge of the full OD
gauge. PU 8 3/8" string mill BHA.
1/27/2019
1/27/2019
1.00
COMPZN
RPCOMP
TRIP
P
TIH with caution, looking for
00:00
01:00
restriction, stack out 10K at 356.4'md.
1/27/2019
1/27/2019
3.50
COMPZN
RPCOMP
MILL
P
PU to 345', bring pumps on at 6bpm,
01:00
04:30
89psi SPP, 75rpm 1700ftlb with
extreme wobble and chatter. Mill
down steadily, wobble stopped when
bumper sub closed. Mill to 370ft,
torque ranging from 1000 to 7000ft1b.
Torque fell off. Drift in hole to TOE at
395'. Backream and work pipe
through 325' to 360' with minimal
torque, 33008 b at 361.6' to 367'. Mill
down to 379', SD rotary, drift up and
down pumping. No losses.
1/27/2019
1/27/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH.
04:30
0500
I
Page 9/38 ReportPrinted: 2121/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Stan Time
End rime
Dur(no
Phase
Op Code
Activity Code
Time P -T -X
Operation
(KKB)
BW Depth(MKB)
1/27/2019
1/27/2019
2.00
COMPZN
RPCOMP
BHAH
P
LD stinger, reconfigure 8 3/8" mill BHA
05:00
07:00
to get mill down to TOF.
1/27/2019
1/27/2019
0.60
COMPZN
RPCOMP
TRIP
P
TIH with 8 3/8" string mill.
07:00
07:30
1/27/2019
1/27/2019
0.50
COMPZN
RPCOMP
CIRC
P
Pump 20 bbls of Hi -Vs sweep.
07:30
08:00
Circulate sweep out of hole. Trace of
sand and metal.
1/27/2019
1/27/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH with 8 3/8" string mill. Lay
08:00
09:00
down string mill.
1/27/2019
1/27/2019
1.50
COMPZN
RPCOMP
BHAH
P
Pick up 7" casing spear with 6.220"
09:00
10:30
grapple.
1/27/2019
1/27/2019
3.00
COMPZN
RPCOMP
FISH
P
RIH and engage 7" spear in to casing
10:30
13:30
stub at 395'. Stack approximately 15-
20 k weight to ensure 7" spear fully
swallowed and engaged. Pull
approximately 100 k over, appear to
have 7" casing fish. POOH to surface,
at surface observed no fish. Signs of
scarring and markings on spear giving
indication 7" spear had engaged in
casing stub. Re -dress spear with new
6.220" grapple and RIH with the same.
1/27/2019
1/27/2019
1.50
COMPZN
RPCOMP
FISH
P
RIH, tagged casing stub high at 393'
13:30
15:00
md. Pulled casing up hole on
previous run approximately 2' before
spear disengaged. Stack
approximately 15-20k weight to
ensure 7" spear fully swallowed and
engaged. Unable to enter top of fish
at 393' and with spear. Several
attempts made unsuccessfuly.
Potential obstruction hindering spear
from entering top of fish.
1/27/2019
1/27/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH with 7" spear and lay down the
15:00
16:00
same.
1/27/2019
1/27/2019
2.50
COMPZN
RPCOMP
BHAH
P
PU 6 1/8" string mill with 2 7/8" stinger
16:00
18:30
BHA. Clean and clear floor.
1/27/2019
1/27/2019
1.00
COMPZN
RPCOMP
MILL
P
TIH w/ string mill 1/335'. Stack wt at
18:30
19:30
401', fell through. RIH w/ 5k drag, set
down 1 Ok at 420' md. Attempt to work
past first casing cut. PU above fish to
380' with 5k drag, Creep in hole
pumping 4bpm, 80psi SPP, rotating
20rpm 850ftlb, reaming down. Stack
weight at 420'md repeatedly, unable to
get stinger past original casing cut.
1/27/2019
1.00
COMPZN
RPCOMP
BHAH
P
POOH, LD stinger. MU 6 1/8" string
19:30
20:30
mill BHA. RIH f/ 301' to 392' pumping
11127/2019
3bpm, 44psi SPP. Tag TOF at
392'md, stack 8K.
1/27/2019
1/27/2019
2.50
COMPZN
RPCOMP
MILL
P
Attempt to enter fish unsuccessful.
20:30
23:00
PU to 380' and rotate 40rpm, 600ftlb.
Ream in hole with 5K drag, entered
fish, torque spiked to 4500ftib at 395',
set down 15K. PU to check if
dragging fish, popped free. Dry tag
fish. RIH pumping 3bpm 40psi SPP,
50rpm 600ftlb, torque increased to
3000ft1b at 395'md/ Mill for 10min.
POOH to inspect BHA.
Page 10/38 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Time
End Time
Our (hr)
Phase
Op Code
Aamiy code
Time P -T -X
OpenOw
start Depth
(M(B)
End DepN (WB)
1/27/2019
1/28/2019
1.00
COMPZN
RPCOMP
BHAH
P
POOH LD string mill, Deep groove in
23:00
00:00
4 3/4" bull nose and immediately
below the cutting structure on the
leading edge of the string mill (little
wear on actual cutting structure)
indicate TOF is folded over.
1/28/2019
1/28/2019
1.50
COMPZN
RPCOMP
BHAH
P
PU taper mill BHA.
00:00
01:30
1/28/2019
1/28/2019
3.00
COMPZN
RPCOMP
MILL
P
RIH f/ 335'tag up at 393'. PU above
01:30
04:30
fish, RIH pumping 6.5bpm, 180psi,
rotating 60rpm 560ftlb ream down to
top of fish. Torque increased to
1000ftlb at 392.7' ream down with
80rpm and torque ranging 1000-
3000ftlb, work mill to 395.86. PU
check free. Continue to mill stacking
weight with no increase in torque or
depth. POOH to check BHA. Found
cutting structure on nose of tapered
mill gone, wear on nose.
1/28/2019
1/28/2019
2.00
COMPZN
RPCOMP
SHAH
P
PU spear 6.47" grapple BHA.
04:30
06:30
1/28/2019
1/28/2019
1.50
COMPZN
RPCOMP
FISH
P
RIH with 7" spear tag top of fish at
06:30
08:00
394' and engage spear at 396'. Pick
up to 1251k fish came free.
112812019
1/28/2019
1.00
COMPZN
RPCOMP
PULD
P
POOH and lay down fish and spear.
08:00
09:00
Recovered approximately 24' of 7"
casing fish. There was no internal
scaring in the 7" casing from initial cut
attempt at 419', which would have
indicated that we pulled from the
second cut at 424' md. therefore
leaving approximately 5' of casing left
in hole.
1/28/2019
1/28/2019
3.50
COMPZN
RPCOMP
SHAH
P
Pick up 7" spear with 6.220" grapple.
09:00
12:30
RIH in an attempt to fish the remaining
5' of 7" casing fish. Estimated top of
fish at 418', unable to tag fish. Tagged
at 397' indicating 9 5/8" casing
impingement. POOH and lay down
spear assembly.
1/28/2019
1/28/2019
1.50
COMPZN
RPCOMP
BHAH
P
Pick up bull nose, 7 1/4" string mill,
12:30
14:00
bumper sub, oil jars, and 9- 4 3/4" drill
collars. Attempt to mill out and drift 9
5/8" casing to the top of the 7" casing
fish at 418'. Milling parameters: 60
RPM, 1400K filbs, 7 bpm and 250 psi
SPP.
1/28/2019
1/28/2019
3.50
COMPZN
RPCOMP
MILL
P
TIH f/302'tag up at 395'md. Attempt
14:00
17:30
to mill out and drift 9 5/8" casing to the
top of the 7" casing fish at 418'.
Milling parameters: 60 RPM, 1400
nibs, 7 bpm and 250 psi SPP. Make
steady progress 24k WOB. Mill to
401.41, at which time torque dropped
off, and RPM increased, twisted off
BHA. POOH to inspect BHA.
1/28/2019
1/28/2019
1.50
COMPZN
RPCOMP
BHAH
T
POOH, stand back BHA. Found
17:30
19:00
bumper sub parted near service
connection (Still in hole bullnose, 7
1/4" string mill and remainder of
bumper sub, 9.13' OAL). 3.29' of 4
3/4" slick looking up. Order tools from
Baker Fishing shop.
Page 11/38 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
a r
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Oepth
Sten Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(RKB)
End Depth(RKB)
1/28/2019
1/28/2019
2.50
COMPZN
RPCOMP
WAIT
T
Wait on fishing tools to recover fish.
19:00
21:30
1/28/2019
1/28/2019
0.50
COMPZN
RPCOMP
SFTY
T
Safety Stand Up with Brandon's crew.
21:30
22:00
Review January incidents.
1/28/2019
1/29/2019
2.00
COMPZN
RPCOMP
WAIT
T
Wait on fishing tools to recover fish.
22:00
00:00
1/29/2019
1/29/2019
3.50
COMPZN
RPCOMP
WAIT
T
Clean and organize rig, perform PM's,
00:00
03:30
install gunline in mud pits, service tong
sheaves, and prepare for picking up
BHA #34 while waiting on fishing
tools/overshot assembly.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
BHAH
T
P/U and M/U and RIH with BHA#34
03:30
04:30
overshot fishing assembly.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
FISH
T
Attempt to engage fish at 390' with
04:30
05:30
rotary stalling out.
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
BHAH
T
Lay down BHA#34 overshot assembly
05:30
06:00
and inspect overshot.
1/29/2019
1/29/2019
1.50
COMPZN
RPCOMP
BHAH
T
P/U and M/U BHA#35 overshot
06:00
07:30
assembly and RIH to 390' and attempt
to engage fish with 43k rotating weight
with 30 rpm at 650 ft/lb torque and
4bpm at 71 psi down to 392.58' with
TDS stalling out.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH to lay down overshot assembly.
07:30
08:30
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and lay down overshot assembly
08:30
09:00
#35 and inspect overshot, lip guide
bent inward with visible markings on
inner ID.
1/29/2019
1/29/2019
2.50
COMPZN
RPCOMP
WAIT
T
Continue rig PM's while waiting on
09:00
11:30
overshot with carbide ring over mill
guide control in overshot.
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
SHAH
T
P/U and M/U BHA#36 overshot
11:30
12:00
1
1
assembly and RIH
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#36 to 390'to attempt to
12:00
12:30
engage fish.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
FISH
T
Attempt to engage fish from 390' with
12:30
13:30
43k rotating weight with 30 rpm at 650
1t/Ib torque and 4bpm at 71 psi down
to 392.58' with TDS stalling out.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA #36
13:30
14:30
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
SHAH
T
B/D and lay down overshot assembly
14:30
15:00
#36 and inspect overshot, lip guide
bent inward with visible markings on
inner ID. Fish never engaged up in
overshot to carbide ring.
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
BHAH
T
P/U and MIN BHA#37 polish mill
15:00
15:30
assembly and RIH
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#37 to 390'to attempt to
15:30
16:30
engage fish.
1/29/2019
1/29/2019
1.50
COMPZN
RPCOMP
MILL
T
Mill with polish mill, check parameters
16:30
18:00
at 390' with 43k rotating weight with 30
rpm at 650 ft/Ib torque to 750 ft/Ib
torque and 4bpm at 71 psi down to
392.46' and mill for 1 foot down to
393.46'. Metal over shakers showing
signs of cutting 9-5/8" casing in small
hair like slivers.
Page 12138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Start Time
End Time
our (hu
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth(ftKe)
1/29/2019
1/29/2019
2.50
COMPZN
RPCOMP
MILL
T
Continue to mill with polish mill, check
18:00
20:30
parameters at 393.46' with 43k
rotating weight with 30 rpm at 650 ft/lb
torque to 750 ft/lb torque and 4bpm at
71 psi down to 394.16' and mill for
total of 1.7 foot down over fish. Metal
over shakers showing signs of cutting
9-5/8" casing in small hair like slivers.
Started seeing occasional torque
spikes as high as 1000ft1b, progress
slowed.
Notified State of upcoming BOPE test
19:45hrs.
1/29/2019
1/29/2019
1.00
COMPZN
RPCOMP
SHAH
T
POOH to check BHA. Found
20:30
21:30
indication of something was up inside
of polish mill, wear on ID (measured
the first 1.6' up inside) and cutting
structure of nose. Found portion of
bumper sub paint gone indicating
contact. PU and MU overshot with 4
3/4"grapple, 1.8ft swallow BHA #38
1/29/2019
1/29/2019
1.50
COMPZN
RPCOMP
FISH
T
Trip in hole f/298' to 389'md, check
21:30
23:00
parameters 4bpm, 60psi, tOrpm
400ftlb torque. RIH, tag up at 394.25',
set down 10k, no bobble getting over
fish, depth indicates overshot
swallowed polished fish. POOH to
inspect, no overpull. No fish. Found
drag mark on overshot and top of
grapple tip broke off.
1/29/2019
1/29/2019
0.50
COMPZN
RPCOMP
BHAH
T
Break off overshot/grapple. M/U 5
2300
2330
7/8" short catch overshot with 4 3/4"
grapple, the objective being to
determine if fishing BHA is getting
over the fish or running beside it.
1/29/2019
1/30/2019
0.50
COMPZN
RPCOMP
FISH
T
TIH f/ 298'tag up at 393.63' twice
23:30
00:00
(TOF 392.55'), PU no overpull. RIH,
set down at 392.55' 10K twice, work
pipe over fish to 393.57' set down 8K.
PU, no overpull. Attempt to engage
fish.
1/30/2019
1/30/2019
1.00
COMPZN
RPCOMP
BHAH
T
B/D and lay out BHA#39 overshot w/
0.0
0.0
0000
01:00
grapple fishing assembly and inspect,
observed no signs of fish
engagement.
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
WWWH
T
P/U and M/U string magnet and
0.0
01:00
0230
Johnny Wacker and flush BOP stack,
collect 3lbs of metal shaving out of
ram cavities, lay out assembly
1/30/2019
1/30/2019
1.00
COMPZN
RPCOMP
BHAH
T
P/U and M/U BHA #40 and rig up
0.0
0230
03:30
Weatherford power tongs and M/U 2-
7/8" Hpac DP.
1/30/2019
1/30/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #40 to 393' and tag up
0.0
03:30
04:00
with several attempts at measured
depth of 392.7'. POOH.
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
BHAH
T
B/D and lay out BHA #40 and rid down
0.0
0400
0530
Weatherford tongs.
1/30/2019
1/30/2019
4.50
COMPZN
RPCOMP
SVRG
T
Service rig, work on spinners, and
0.0
0530
10:00
perform PM's while waiting on clean
and filtered 9.3 ppg brine for down
hole camera operations.
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
BHAH
T
P/U and M/U BHA #41 with overshot
10:00
11:30
1
1 1
1
1
1 for camera guide shoe.
Page 13/38 Report Printed: 2/2112019
a Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op Cade
ACBvity Code
Time P -T -X
Operation
(flKB)
EM Depth (flKB)
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #41 to 392.85'. RU circ
11:30
13:00
equipment.
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
ELNE
T
Spot and R/U Alaska E -Line and hang
13:00
14:30
sheave in elevators on TDS and
prepare to pick up down hole camera.
1/30/2019
1/30/2019
1.50
COMPZN
RPCOMP
CIRC
T
Pump 20 bbl high vis pill at 391.85'
0.0
14:30
16:00
and chase with 65 bbls 9.3ppg brine,
returns clean and clear brine water for
down hole camera.
1/3012019
1/30/2019
3.00
COMPZN
RPCOMP
ELNE
T
R/U EV down hole camera on E -Line
16:00
19:00
and RIH to 392'
1/30/2019
1/30/2019
3.50
COMPZN
RPCOMP
CIRC
T
MU pump in in sub, RU Little Red to
19:00
22:30
pump 50bbl and displace well to
140deg F healed diesel. Move pipe
up and down to flush the top of fish.
Allow to soak 30min. Reverse circ
with 45bbi filtered brine.
1/30/2019
1/31/2019
1.50
COMPZN
RPCOMP
ELOG
T
R/U EV down hole camera on E -Line
22:30
00:00
and RIH to 392'. Poor visibility, motor
slow. POOH change out motor,
reconfigure tool string.
1/31/2019
1/31/2019
2.50
COMPZN
RPCOMP
ELOG
T
RU aline RIH to top of fish, pump
0.0
0.0
00:00
02:30
varying rate with fresh, utility water,
until visiblity improved. RIH past top
of fish to view sideview camera.
1/31/2019
1/31/2019
1.00
COMPZN
RPCOMP
ELOG
T
RD Eline. Review data, screenshots
0.0
0.0
02:30
03:30
and video snippets. Transfer files.
1/31/2019
1/31/2019
0.50
COMPZN
RPCOMP
CIRC
T
Circulate 9.3ppg brine 5bpm, 200psi,
0.0
0.0
03:30
04:00
displace FW. R/D blow down lines.
C/O handling equipment.
1/31/2019
1/31/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH standing back, LD overshot.
0.0
0.0
04:00
04:30
1
1/3112019
1/31/2019
1.00
COMPZN
RPCOMP
CLEN
P
Pull wear ring. Jet the stack. 10bpm,
0.0
0.0
04:30
05:30
rotate and flush clean.
1/3112019
1/31/2019
3.00
COMPZN
RPCOMP
BOPE
P
PU test joints, 2-7/8" - 7" - 3-1/2" and
0.0
0.0
05:30
08:30
check space out depths for donut
bottoms of test joints. Prepare to
pressure test BOPE. Pressure test
witness waived by Matt Herrara with
AOGCC via email and phone.
1/31/2019
1/31/2019
6.50
COMPZN
RPCOMP
PRTS
P
Pressure test BOPE, 250 psi low 5
0.0
0.0
08:30
15:00
minutes / 2,500 psi high 5 minutes on
2-7/8" test joint on annular and UVBR,
7" test joint on LPR and annular, 3-
1/2" on UPR, choke manifold and
FOSVs. Perform gas alarm tests and
Koomey draw down test. All tests
good.
1/31/2019
1/31/2019
1.50
COMPZN
RPCOMP
RURD
P
Lay down test tool and clear and clean
0.0
0.0
15:00
16:30
rig floor, Make up landing joint and pull
test plug, turn landing joint and test
plug and RIH and land wear bushing
and run in one lock down screw. Lay
out landing joint.
1/31/2019
1/31/2019
2.50
COMPZN
RPCOMP
WAIT
T
Wait on fishing tools.
0.0
0.0
16:30
19:00
1/31/2019
1131/2019
1.50
COMPZN
RPCOMP
BHAH
T
M/U spear with 3.203" grapple on bent
0.0
0.0
19:00
20:30
1
1
1
Isub BHA.
1/31/2019
1/31/2019
0.50
COMPZN
RPCOMP
CIRC
T
RIH f/ 3outt, to top of fish, pump 1Obbll
0.0
0.0
20:30
21:00
1
High vis. sweep, recover fair amount
of metal shavings on magnets.
Page 14/38 ReportPrinted: 2/2112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Start Tim
End Tim
our (hr)
Phase
Op cotle
Activity Code
Time P -T -X
Operation
(NCB)
End Depth (NCB)
1/31/2019
1/31/2019
0.50
COMPZN
RPCOMP
FISH
T
RIH pumping ibpm, 260psi, 44k hkld
0.0
0.0
21:00
21:30
to 393'md, past fish. PU 1/4 turn to
left RIH saw pump pressure increase
to 320 psi, 4k drag, set down 10K at
392', top of fish. Tum 1/4 tum and run
past fish in all other orientations,
Reorient pipe RIH saw pump pressure
increase to 295psi, set down wt. PU
5K overpull then fell off.
1/31/2019
1/3112019
1.50
COMPZN
RPCOMP
BHAH
T
POOH to inspect BHA. Found grapple
0.0
0.0
21:30
23:00
in released position, will re -run. PU
reset grapple BHA.
1/31/2019
2/1/2019
1.00
COMPZN
RPCOMP
CIRC
T
RIH f/ 300ft to top offish, pump ibpm
0.0
0.0
23:00
00:00
280psi,44k string wt. Attempt to
engage fish.
2/1/2019
2/112019
0.50
COMPZN
RPCOMP
FISH
T
Attempt to spear fish. Pumping ibpm
0.0
0.0
00:00
00:30
280psi, set down 10K at 394', PU
rotate 1/8 turn, RIH past to 397', PU
rotate 1/8 turn tagged top offish at
391', pump pressure increase, rotate
in, set down at 394ft. POOH to
inspect BHA.
211/2019
2/1/2019
2.00
COMPZN
RPCOMP
BHAH
T
POOH standing back DC. Found
0.0
0.0
00:30
02:30
circle on nose of grapple, indicating
set down on ID of FISH. Grapple
released, dings indicated tag up.
Unable to engage fish with spear. PU
6 3/8" overshot with 4" grapple BHA.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
FISH
T
RIH f/ 298ft pumping 30psi at 2.5bpm,
0.0
0.0
02:30
03:30
string wt 44k. Set down at 392' 10K
work pipe down over fish to 394', at
down 15k, PU 51k overpull, popped off.
POOH to inspect BHA.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
BHAH
T
Found opposing scarring on first few
0.0
0.0
03:30
04:30
teeth of grapple. PU 5 3/4" overshot
with 3in grapple.
2/1/2019
2/1/2019
0.50
COMPZN
RPCOMP
FISH
T
RIH f/ 29811 purring 3bpm, 44psi, 44k.
0.0
0.0
04:30
05:00
Set down IOK at 392ft. Work pipe
over fish, set down 12K. PU overpull,
allow jars to bleed open. PU 40K
overpull, chained it down, PU 60K
overpull, chained it down, showing
some sign of upward movement. PU,
popped free at 80K overpull. POOH
to inspect.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
BHAH
T
Entire 7-1/4" mill fish BHA recovered,
0.0
0.0
05:00
06:00
1 lay out BHA #45.
2/1/2019
2/1/2019
2.50
COMPZN
RPCOMP
BHAH
T
Clean and clear rig floor, break down
0.0
0.0
06:00
08:30
Spear Assembly and clean up fishing
tools on dg Floor and lay out to pipe
shed for back haul. Prepare to pick up
8-1/2" string mill assembly BHA #46.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
BHAH
T
P/U and M/U BHA #46 string mill
0.0
0.0
08:30
09:30
assembly with 8-1/2" rough OD.
2/1/2019
2/112019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #46 to 362' and observe
0.0
0.0
09:30
10:00
2k bobble, pick up and break
circulation to begin milling/washing in
hole.
Page 16138 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Cone
Time P -T -X
Dpemon
(ftKB)
End Depth (flKB)
2/1/2019
2/1/2019
4.00
COMPZN
RPCOMP
MILL
T
Reaming/Milling/Washing down from
0.0
0.0
10:00
14:00
362' to 392' with 8-1/2" mill assembly
on 3-1/2" DP with 10 bpm, 180 psi, 60
rpm at 1100 to 2100 ft/lbs torque. Up
weight at 43k and down weight 43k.
Pumping 10 bbl Hi -Vis sweeps as
needed, small metal shaving on ditch
magnets, no abnormal metal shaving
at shakers.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA #46 to surface.
0.0
0.0
14:00
15:00
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
BHAH
T
Inspect 8-1/2" string mill on surface,
0.0
0.0
15:00
16:00
good. Pick up stand of 6-1/4" drill
collar and RIH with 8-1/2" string mill
on stiffer assembly BHA #47.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA #47 to 362' with no tag
0.0
0.0
16:00
17:00
up's.
2/1/2019
2/1/2019
2.00
COMPZN
RPCOMP
MILL
T
Reaming/Milling/Washing down from
0.0
0.0
17:00
19:00
362' to 392' with 8-1/2" mill assembly
on stand of 8-1/4" DC with 10 bpm,
180 psi, 60 rpm at 1100 to 2100 ft/lbs
torque. Up weight at 43k and down
weight 43k. Pumping 10 bbl Hi -Vis
sweeps as needed, small metal
shaving on ditch magnets, no
abnormal metal shaving at shakers.
2/1/2019
2/1/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH with BHA 947 to surface.
0.0
0.0
19:00
19:30
2/1/2019
2/1/2019
0.50
COMPZN
RPCOMP
SFTY
P
Safety Stand Up with Ralph's crew.
0.0
0.0
19:30
20:00
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
BHAH
T
Inspect 8-1/2" string mill on surface,
0.0
0.0
20:00
21:00
good, lay down mill. Rack back stand
of 6-1/4" drill collar and RIH with 8"
string mill on 3 12" DP BHA #48.
2/1/2019
2/1/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA #48 to 388' with no tag
0.0
0.0
21:00
22:00
up's, establish off bottom parameters
10bpm, 150psi, 60 rpm 970ftib. RIH,
torque increased at 3951 to 1200ft1b.
2/1/2019
2/1/2019
1.50
COMPZN
RPCOMP
MILL
T
Reaming/MillingNVashing down from
0.0
0.0
22:00
23:30
395' to 397.3' with 8" mill assembly on
stands of 3-1/2" DP with 10 bpm, 150
psi, 60 rpm at 1100 to 2900 ft/lbs
torque. Up weight at 43k and down
weight 43k. Pumping 10 bbl Hi -Vis
sweeps as needed, small metal
shaving on ditch magnets, no
abnormal metal shaving at shakers,
possible chips of cement on shakers.
PU, no overpull, drift in hole pumping
to 397' with some bobbles. PU to 389'
ream in hole, torque increased from
750 to 2500ftlbs at 397.3'. after 15min
no progress torque not dropping off,
POOH to inspect mill.
2/1/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
Prepare, POOH w/ mill BHA #48
0.0
0.0
23:30
00:00
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
TOOH, found mill in good condition,
0.0
0.0
00:00
00:30
1
some wear on XO sub. Will re -run.
Page 16/38 Report Printed: 2121/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Sten Depth
Start Time
End Time
our (hr)
phase
Op Code
A Viry Code
Time P -T -X
Operation
(flK0)
End Depth (flK0)
212/2019
2/2/2019
2.00
COMPZN
RPCOMP
MILL
T
TIH to 397', set down 5K. PU to 392',
0.0
0.0
00:30
02:30
establish parameters; 460psi at
11 bpm, 880ftlb at 60rpm.
Wash/Ream/Mill down to 397', 2500-
4300ftlb, 3-5k WOB to 401.1', torque
erratic.
PU to 387', wash/ream back to 401.1.
Mill 1700ftlb at 65rpm, 2-5k WOB
10minutes then torque not falling off.
Saw some cement or rock come over
shakers. PU to 385', wash down to
396', stack 5k. POOH to inspect BHA.
2/2/2019
21212019
1.00
COMPZN
RPCOMP
TRIP
T
POOH. Found 8" string mill worn at a
0.0
0.0
02:30
03:30
sharp angle on leading edge, a groove
on the bull nose and the joint of 3-1/2"
DP above the mill shiny from contact.
2/212019
212/2019
0.50
COMPZN
RPCOMP
SHAH
T
Lay out and flag bad joint of 3 1/2" DP.
0.0
0.0
03:30
04:00
PU 9ft flex joint below the string mill to
drift for a ledge.
2/2/2019
212/2019
0.50
COMPZN
RPCOMP
MILL
T
RIH, set down 8K at 397'. PU to 386'
0.0
0.0
04:00
04:30
600ft1b at 27rpm, 145psi at 10bpm.
Ream/wash down, torque 3000ftlb at
397'. Pull up above, stop rotating,
wash down, set down 10k at 397'.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
CIRC
T
Pump a 10bbi sweep on bottom.
0.0
0.0
04:30
05:00
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH to change BHA configuration.
0.0
0.0
05:00
05:30
2/2/2019
2/2/2019
1.00
COMPZN
RPCOMP
BHAH
T
8" mill has flat wear on leading edge of
0.0
0.0
05:30
06:30
mill blades with work wear on 6-3/8"
bull nose. Tools showed engagement
of the mills on the first two bulges in
the 9-5/8" casing at 392' and 394', the
third bulge at 397' seems to be
causing a side load geometry that
effectively pinched the bull nose over
to the side and allowed the mill to
contact the last bulge at 397' where
the mill could not get Weight On Bit.
B/D and UD 8" string mill and P/U and
M/U BHA#50, 8-1/4" shod stand off
mill on bull nose assembly.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #60 to 392'.
0.0
0.0
06:30
07:00
2/2/2019
2/2/2019
2.00
COMPZN
RPCOMP
MILL
T
M/U TDS at 392' establish
0.0
0.0
07:00
09:00
parameters; 460psi at 11 bpm, 880ftlb
at 60rpm. Wash/Ream/Mill down to
397', 2500-4300ftib, 3-5k WOB to
401.1' with mill depth at 398', torque
erratic and then smoothed off with 5k
WOB following same pattern as
previous mill run, mill to 402'. Prepare
to POOH.
2/2/2019
2/212019
0.50
COMPZN
RPCOMP
TRIP
T
POOH with BHA #50
0.0
0.0
09:00
09:30
1
Page 17138 Report Printed: 2/2112 01 9
. Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Stan Time
EM rime
our (hr)
Phase
op Code
Activity Code
rime P -T -x
operaEon
(flea)
End Depth (B)(a)
2/2/2019
2/2/2019
1.00
COMPZN
RPCOMP
BHAH
T
8-1/4" mill shows sign of work, first
0.0
0.0
09:30
10:30
joint of 3-1/2" drill pipe has work marks
on it that corresponds to 392' and
another wear patters above mill at
394' and below the mill at bull nose at
399' reference, chalked up bottom of
bull nose still has chalk markings.
Break down BHA#50. PIU and M/U
BHA#51, 8-1/2" mill in tandem with 8-
1/4" mill.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#51 to 355' and start
0.0
0.0
10:30
11:00
taking slight weight, M/U TDS
establish parameters; 460psi at
11 bpm, 880111b at 60rpm.
2/2/2019
2/2/2019
1.50
COMPZN
RPCOMP
MILL
T
Wash/Ream/Mill down to 392' with
0.0
0.0
11:00
12:30
only 1-2k WOB and 880 to 1200 ft/lbs
through spot at 360' to 370' and
smoothed out down to 392'.
Mill/ReamNVash down from 392'to
401' at 2500-7300ftib, 3-5k WOB,
observed decrease in torque to 3000
ft/lb and WOB go up to 5k with torque
coming up to 6k fl/lb and leveling off,
signs mills were hung on lip again.
Prepare to POOH.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH with BHA#51
0.0
0.0
12:30
13:00
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
BHAH
T
8-1/4" short bottom mill shows signs of
0.0
0.0
13:00
13:30
work on main body OD of mill, B/D
and UD BHA#51. P/U and M/U BHA
#52 with 8-1/2" string mill on bull nose.
212/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#52 to 392', no drag or
0.0
0.0
13:30
14:00
bobbles through 360'to 370'.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
MILL
T
M/U TDS, with starting parameters:
0.0
0.0
14:00
14:30
460psi at 11 bpm, 880ft1b at 60rpm,
MIIVReamN/ash down from 392' to
401' at 2500-7300ftib, 3-5k WOB,
observed decrease in torque to 3000
Witt and WOB at 5k, signs mills were
hung on lip again. Prepare to POOH.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH with BHA#52.
0.0
0.0
14:30
15:00
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD BHA#52 and PIU and
0.0
0.0
15:00
15:30
M/U BHA#53 with bull nose, 4-1/2"
flex joint and 8" mill.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #53 to 392'.
0.0
0.0
15:30
16:00
2/2/2019
2/2/2019
1.00
COMPZN
RPCOMP
MILL
T
M/U TDS, with starting parameters:
0.0
0.0
16:00
17:00
460psi at 11 bpm, 880ftlb at 60rpm,
Mill/Ream/Wash down from 392' to
399' at 2500-7300ft1b, 3-5k WOB,
observed decrease in torque to 3700
ft/1b and WOB at 5k, signs flex joint
and bull plug were hung on lip again.
Prepare to POOH.
2/2/2019
2/2/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA#54. Lay out mill and
0.0
0.0
17:00
18:00
re -run BHA.
Page 18138 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Depm
Start Time
End Time
Our (hr)
Phase
Op Code
Activdy Code
Time P -T -x
Operation
(ftKB)
EM Depth (ftKB)
2/2/2019
2/2/2019
2.00
COMPZN
RPCOMP
TRIP
T
RIH to drift with 6 3/4" bullnose, flex
0.0
0.0
18:00
20:00
joint on 3 112" DP, set down at 399',
rotated and fell through, set down at
404'. POOH.
Lay out all BHA.
RIH with 4 3/4" bullnose on 3 1/2" DP,
set down at 399', rotated, fell through,
continue in hole to 424' no need to go
further. POOH.
2/2/2019
2/2/2019
0.50
COMPZN
RPCOMP
BHAH
T
Break off 4 3/4" bullnose. PU BHA
0.0
0.0
20:00
20:30
#56, 8 1/2" lower mill (cutting structure
length is —1', tapers to 5 3/4" OD) and
5 1/2" OD muleshoe on DP. TIH, set
down at 399', rotate and fall through.
2/2/2019
2/2/2019
2.50
COMPZN
RPCOMP
MILL
T
Continue in hole to 401.7', PU to
0.0
0.0
20:30
23:00
400.8', establish parameters 407gpm,
150psi, 1100ft Ib at 60rpm. Ream in
hole, mill from 401.7 to 404' torque
ranging 1400-2000ftib rpm 60-90. PU
above, shutoff rotary and wash down
without bobbles to 403.4'.
2/2/2019
2/3/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH to inspect BHA. PU 8" string
0.0
0.0
23:00
00:00
mill and 6 3/4" rounded bull nose on 3
1/2" DP, RIH.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
MILL
T
TIH down to 404' with no bobbles; PU
0.0
0.0
00:00
00:30
and establish parameters 630ftlb at
72rpm, 180 psi at 10bpm
Mill/Ream/Wash down to 404' al 1700-
2500ftib, 3-5k WOB, observed torque
leveling off, signs mills were hung on
lip again. Prepare to POOH.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH to change BHA. LD 8" mill, PU
0.0
0.0
00:30
01:30
8 1/4" lower mill with muleshoe again.
2/3/2019
2/3/2019
1.50
COMPZN
RPCOMP
MILL
T
TIH down to 404' with slight bobbles
0.0
0.0
01:30
03:00
establish parameters 730ft1b at 60rpm,
170 psi at 10bpm Mill/Ream/Wash
down to 406' at 1500-2500ftib, 2-4k
WOB, observed high torque with little
WOB. Prepare to POOH.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH to change BHA. LD 81/4"
0.0
0.0
03:00
04:00
lower mill, found tool joint showing
signs of contact. PU 8 3/4" string mill
and 6 3/8" rounded bull nose, BHA
#59 TIH on 312" DP.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
TRIP
T
TIH with 6-3/4" mill down to 353', take
0.0
0.0
04:00
04:30
wt.
2/3/2019
2/3/2019
2.00
COMPZN
RPCOMP
MILL
T
P/U establish parameters 700ft1b at
0.0
0.0
04:30
06:30
60rpm, 175 psi at 10bpm
Mill/ReamlWash down to 355' at
1200ftib, 24k WOB, continue to 359',
Mill/Ream/Wash down to 367' at
1200RIb, 2-4k WOB, continue to 370',
torque spiked to 2000ftib at 371', PIU
and ease back down, able to drift
without rotating, just washing down at
10 bpm at 175 psi. Continue in hole to
392' and see tag up with 2k down
weight, continue
milling/washing/reaming down with 60
rpm at 700 fUlb to 3000 ft/Ib torque
with 10bpm at 175 psi to 399.4' and
lake 5k WOB tag up with 3,000 ft/lbs
torque. Pick up off bottom to prepare
and POOH.
Page 19138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
startDepth
Stmt Time
End Time
our (hr)
Phase
Op carte
Activity Coee
Time P -T -X
Operadon
(fiKB)
End Depth (flKB)
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
TRIP
T
Circulate, pump Hi -Vis Sweep out of
0.0
0.0
06:30
07:00
hole at 399', nothing abnormal over
shakers, a few small pieces of
soft/semi-hard cement 3cm x 3cm
size. Shakers clean after sweep out.
POOH.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
BHAH
T
BID and LID BHA#59 8-3/4" string mill
0.0
0.0
07:00
07:30
BHA and M/U 8-1/4" short string mill
and RIH with BHA #60.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#60 to 399', no tag ups,
0.0
0.0
07:30
08:00
slick.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
MILL
T
P/U at 399' and establish parameters
0.0
0.5-
08:00
09:00
700ftlb at 60rpm, 175 psi at 10bpm
Mill/Ream/Wash down to 418.5' at 700
fUlb to 1000ftlb torque, 0-1k WOB,
hole slick, no issues (could not go to
419' to tag top of 7" casing cut due to
TDS stand down to rig floor. Prepare
Ito POOH.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
CIRC
T
Circulate, pump Hi -Vis sweep at
0.0
0.0
09:00
09:30
418.5', sweep clean at shakers,
nothing abnormal over shakers.
Perform dg service on TDS.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH from 418.5' with BHA#60, slick
0.0
0.0
09:30
10:00
no over pull, mill assembly clean.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
BHAH
T
BID and LID BHA #60, P/U and M/U 7"
0.0
0.0
10:00
11:00
casing spear assembly with jars and
bumper sub and RIH with fishing BHA
#61.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH to 418' with spear fishing BHA
0.0
0.0
11:00
11:30
#61 to engage 7" cut casing fish at
419'.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
FISH
T
P/U at 418' and establish parameters
0.0
0.0
11:30
12:00
100 psi at 5bpm, hole slick, no issues.
Slack off from 418' to 419' and engage
7" x 5' cut fish with spear with t Ok
slack off and no measureable increase
in string weight.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
TRIP
T
Circulate and Prepare to POOH,
0.0
0.0
12:00
13:00
POOH with 7" x 5' cut fish from 424'
bottom of fish and 419' lop of fish to
surface laying out fishing assembly
and fish. Area of 9-5/8" at 398' took
overpull and 5 jar attempts to free fish
at 100k over, Only sign on fish was a
slight roll of the top of the 7" cut,
fishing tool assembly showed no sign
of abnormal wear or cuts.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
SHAH
T
Lay down 4.9' of 7" fish, B/D and UD
0.0
0.0
13:00
13:30
spear fishing assembly BHA #61.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
SFTY
T
Perform DROPS inspection of derrick
0.0
0.0
13:30
14:00
and TDS, all good, no finds.
2/3/2019
2/3/2019
0.50
COMPZN
RPCOMP
SHAH
T
P/U and M/U 8-1/4" x 8-1/2" tandem
0.0
0.0
14:00
14:30
milling assembly BHA#62 and RIH
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#62 to 392'slick with no
0.0
0.0
14:30
15:30
tag up spots.
2/3/2019
2/3/2019
1.00
COMPZN
RPCOMP
MILL
T
P/U and M/U TDS at 392' and
0.0
0.0
15:30
16:30
establish parameters 171 psi at
10bpm, hole slick, no issues until 398'
and tag up with 10k down, same as
we seen early, mill assembly not
acting like mill was engaging. Prepare
Ito POOH.
Page 20138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
16 2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
San Depth
Sart Tme
End Time
our (hr)
Phase
Op Code
Activity Cace
Time P -T -X
Operation
(W15)
End Depth(ftKB)
2/3/2019
2/4/2019
7.50
COMPZN
RPCOMP
RGRP
T
Rig service TDS, change out IBOP
0.0
0.0
16:30
00:00
due to jarring fatigue of automatic gear
on IBOP, change out saver sub. PU
bull plug, pressure test IBOP on TDS
250psi, 2500psi 5min FAIL. Remove
upper IBOP, lower safety valve.
Found sheared dowell in clamp.
Service TDS, replace
broken/damaged parts. Retrieve
mechanic stuck behind rig move.
2/4/2019
2/4/2019
6.00
COMPZN
RPCOMP
RGRP
T
Repair IBOP onTDS. Replace SOP
0.0
0.0
00:00
06:00
shifter and gear control and function
test, pressure test 250, 2500psi. Good
Tests.
2/4/2019
2/4/2019
1.00
COMPZN
RPCOMP
SVR-
T
Clear and clean rig Floor, final
0.0
0.0
06:00
07:00
inspection on TDS, DROPS inspection
on TDS, prepare to POOH
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH w/ BHA #62
0.0
0.0
07:00
07:30
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD BHA #62, UD 8-1/4"
0.0
0.0
07:30
08:00
string mill and M/U and RIH with BHA
#63 8-1/2" string mill assembly.
2/4/2019
2/412019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with 8-1/2" milling assembly BHA
0.0
0.0
08:00
08:30
#63 to 398', hole slick no obstructions.
2/4/2019
2/4/2019
1.00
COMPZN
RPCOMP
MILL
T
PIU at 398' and establish parameters
0.0
0.0
08:30
09:30
700ftlb at 60rpm, 175 psi at 10bpm
Mill/ReamM/ash down to 424' at 700
ft/lb to 3000ft1b torque, 0-2k WOB,
hole slick, no issues. Prepare to
POOH.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
Circulate, pump Hi -Vis Sweep out of
0.0
0.0
09:30
10:00
hole at 423', nothing abnormal over
shakers. Shakers clean after sweep
out. POOH with BHA #63, no over pull
encountered, hole slick, hole taking
proper displacement.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD BHA#63, and M/U 8-1/4"
0.0
0.0
10:00
10:30
string mill on bottom in tandem with 8-
1/2" string mill and RIH with tandem
milling assembly BHA #64.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with 8-1/4" x 8-1/2" tandem milling
0.0
0.0
10:30
11:00
assembly BHA #64 to 392', hole slick
no obstructions.
21412019
214/2019
1.00
COMPZN
RPCOMP
MILL
T
P/U at 392' and establish parameters
0.0
0.0
11:00
12:00
700ft1b at 60rpm, 175 psi at 1 Obpm
Mill/Ream/Wash down to 396' at 700
ft/Ib to 3000ftlb torque, 0-5k WOB, at
397' stacked up weight without mill
engaging. Prepare to POOH.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
Circulate, pump Hi -Vis Sweep out of
0.0
0.0
12:00
12:30
hole, nothing abnormal over shakers.
Shakers clean after sweep out. POOH
with BHA #64, no over pull
encountered, hole slick, hole taking
proper displacement.
2/412019
2/4/2019
0.50
COMPZN
RPCOMP
BHAH
T
Inspect mills, no abnormal wear on
0.0
0.0
12:30
13:00
milling assembly but on bull nose, BID
and UD BHA #64, and M/U 8" x 8-1/2"
tandem milling assembly BHA #65.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH BHA #65 on 3-1/2" DP to 395'
0.0
0.0
13:00
13:30
picking up singles out of pipe shed
and racking DP back to make room in
pipe shed for bringing in 7" casing to
be strapped, drifted, and prepared for
running on off -drillers side.
Page 21138 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phae
Op Cotle
Activity Code
Time P -T -X
Operation
(flKB)
End Depth IRKS)
2/4/2019
2/4/2019
1.00
COMPZN
RPCOMP
MILL
T
P/U at 392' and establish parameters
0.0
0.0
13:30
14:30
700ftlb at 60rpm, 175 psi at 10bpm
Mill/Ream/Wash down to 399' at 700
ft/lb to 3000ftib torque, 0-5k WOB,
stacked up weight without mill
engaging. Prepare to POOH.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
Circulate, pump Hi -Vis Sweep out of
0.0
0.0
14:30
15:00
hole, nothing abnormal over shakers.
Shakers clean after sweep out. POOH
with BHA #65, no over pull
encountered, hole slick, hole taking
proper displacement.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
SVRG
T
Rig service, service TDS rotary sensor
0.0
0.0
15:00
15:30
and service pipe skate and re -arrange
derrick stands to continue POOH and
racking back stands with drill collars in
better position.
2/4/2019
214/2019
0.50
COMPZN
RPCOMP
BHAH
T
Inspect mills, no abnormal wear on
O.0
0.0
15:30
16:00
milling assembly but on bull nose, B/D
and UD BHA #65, and M/U 8-3/8" x 8-
1/4" tandem milling assembly BHA
#66.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA #66 milling assembly
0.0
0.0
16:00
16:30
picking up 3-1/2" DP singles out of
pipe shed to 392'.
2/4/2019
2/4/2019
2.00
COMPZN
RPCOMP
MILL
T
P/U at 392' and establish parameters
0.0
0.0
16:30
18:30
706ftib at 60rpm, 175 psi at IObpm
Mill/Ream/Wash down 39T -99'1.5k
TQ continue to 401-408', 1.5k TO,
continue in hole to 423'. Backream to
390'then drift slick to 423'. Pump
10bbi sweep. Prepare to POOH.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH w/ BHA#66. No over pull
0.0
0.0
18:30
19:00
encountered, hole slick, hole taking
proper displacement.
2/4/2019
2/4/2019
1.50
COMPZN
RPCOMP
SHAH
T
Inspect mills, no abnormal wear on
0.0
0.0
19:00
20:30
milling assembly but on bull nose, B/D
and UD BHA #66, and M/U 8-3/8" x 8-
1/2" tandem milling assembly on DC
BHA#67.
2/4/2019
214/2019
0.50
COMPZN
RPCOMP
TRIP
T
Trip in hole picking up 3 1/2" DP to
0.0
0.0
20:30
21:00
1
1
1355'
2/4/2019
2/4/2019
2.00
COMPZN
RPCOMP
MILL
T
P/U and establish parameters
0.0
0.0
21:00
2300
PU/SO/ROT wt 45k, 6501111b at 60rpm,
160 psi at 10bpm Mill/Ream/Wash
tight spots @ 363'-370', 2.5k TO, 380'-
385' 1.4k TQ, 3991402' 1.6k TQ and
410'415' 2.3k TQ, continue down to
420'. Backream to 360', max TQ
1.2K. Prepare to POOH.
2/4/2019
2/4/2019
0.50
COMPZN
RPCOMP
TRIP
T
POOH w/ BHA#67. No over pull
0.0
0.0
23:00
23:30
encountered, hole slick, hole taking
proper displacement.
2/4/2019
215/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD BHA #67
0.0
0.0
23:30
00:00
2/512019
2/5/2019
1.00
COMPZN
RPCOMP
BHAH
T
LD BHA #67, PU BHA #68 5-
0.0
0.0
00:00
01:00
7/8"overshot with 3 1/2" grapple, jars
and bumper sub on 3 stands 4 3/4"
DC.
2/512019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
Trip in hole f/ 301' to top of 7" rasing
0.0
0.0
01:00
02:00
stub @ 426.5', set down 5K. Work
pipe up and down rotating, drop in.
TIH to 1819' set down 5K.
Page 22138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Depth
sten Time
End Time
Dur (hr)
Phase
Op Code
ANvity Cone
Time P -T -X
Operation
(ftK8)
End Depth (ftKS)
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
FISH
T
PU, establish parameters PU/SO
0.0
0.0
02:00
03:00
60K/60K, 185psi @ 4bpm. Attempt to
wash down. Al bottoms up saw artic
pac come over shakers then cleaned
up. Wash to 1821', pump pressure
increased to 270psi. PU, no overpull
and wash down @ 10bpm, pump
pressure increasing, attempt to clean
up, unable to get any deeper. POOH
to change BHA.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
Trip out of hole. No over pull
0.0
0.0
03:00
04:00
encountered, hole slick, hole taking
proper displacement.
2/5/2019
2/5/2019
1.50
COMPZN
RPCOMP
SHAH
T
B/D and UD BHA#68, and M/U
0.0
0.0
04:00
05:30
reverse junk basket, jars and bumper
sub on 3 stands 4-3/4" DC and RIH
with BHA #69.
2/5/2019
2/5/2019
1.50
COMPZN
RPCOMP
TRIP
T
Trip in hole f/ 306' with BHA #69 to
0.0
0.0
05:30
07:00
1790', hole slick no issues entering top
of cut 7" rasing.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
CIRC
T
Circulate reverse junk basket down
0.0
0.0
07:00
07:30
from 1790' to 1828' with I Obpm at 765
psi and work junk basket up and down
in 3' strokes and observe good signs
junk moving into reverse basket.
Prepare to POOH.
2/5/2019
2/5/2019
2.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA #69 to surface, hole
0.0
0.0
07:30
09:30
slick, well taking proper displacement.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
BHAH
T
BID and UD reverse junk basket BHA
0.0
0.0
09:30
10:00
#69, large 5" by 3" pieces x 4 of cut
and milled/tore 9-5/8" rasing retrieved
in junk basket. P/U and M/U BHA#70
with re -dressed reverse junk basket
and cages and RIH.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#70 to 1780', hole slick,
0.0
0.0
10:00
11:00
no tag ups or issues entering top of 7"
cul casing.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
CIRC
T
Circulate reverse junk basket down
0.0
0.0
11:00
11:30
from 1790' to 1828' with 10bpm at 765
psi and work junk basket up and down
in 3' strokes and observe good signs
junk moving into reverse basket.
Prepare to POOH.
2/5/2019
2/52019
1.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA#70 to surface, hole
0.0
0.0
11:30
12:30
1
1
slick, well taking proper displacement.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
BHAH
T
BID and UD reverse junk basket BHA
0.0
0.0
12:30
13:00
#70, large 3" by 2" pieces x 4 of cut
and milled/tore 9-5/8" casing retrieved
in junk basket along with 10 pounds of
fine millings, only a few pieces of
rounded formation and cement 3cm x
3cm (formation looks to be black
gravel). PIU and MIU BHA#71 with re-
dressed reverse junk basket and
cages and RIH.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#71 to 1780', hole slick,
0.0
0.0
13:00
14:00
no tag ups or issues entering top of 7"
cut casing.
2/52019
2/52019
1.50
COMPZN
RPCOMP
CIRC
T
Circulate reverse junk basket down
0.0
0.0
14:00
15:30
from 1790'to 1828' wbh 10bpm at 765
psi and work junk basket up and down
in 3' strokes and observe good signs
junk moving into reverse basket.
Prepare to POOH.
Page 23/38 Report Printed: 2121/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Sten Depth
Start Mme
End Time
our (hn
Phase
Op Code
Ac&m, Code
Time P -T -X
Operation
(IIKB)
EM Depth (NCS)
2/5/2019
2/5/2019
2.00
COMPZN
RPCOMP
TRIP
T
POOH with BHA#71 to surface, hole
0.0
0.0
15:30
17:30
slick, well taking proper displacement.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
BHAH
T
B/D and UD reverse junk basket BHA
0.0
0.0
17:30
18:30
#71, large 3" by 2" pieces x 4 of cut
and milled/tore 9-5/8" casing retrieved
in junk basket along with 10 pounds of
fine millings, only a few pieces of
rounded formation and cement 3cm x
3cm (formation looks to be black
gravel). P/U and M/U BHA#72 with
reverse junk basket.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#72 to 1780', hole slick,
0.0
0.0
18:30
19:00
no tag ups or issues entering top of 7"
cut casing.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
CIRC
T
Circulate reverse junk basket down
0.0
0.0
19:00
20:00
from 1790' to 1828' with 10bpm at 765
psi and work junk basket up and down
in 3' strokes and observe good signs
junk moving into reverse basket.
Prepare to POOH.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH from 1828' to surface. Hole
0.0
0.0
20:00
21:00
slick, no overpull issues, hole taking
proper displacement.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and clean out reverse junk
0.0
0.0
21:00
21:30
basket BHA#72 with 2large 3X3"
pieces looks like 9 5/8"casing. RIH
with BHA#73 to clean top of fish at
1828'.
2/5/2019
2/5/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#73 to 1820', hole slick,
0.0
0.0
21:30
22:30
no tag ups or issues entering top of 7"
cut casing.
2/5/2019
2/5/2019
0.50
COMPZN
RPCOMP
CIRC
T
Circulate reverse junk basket down
0.0
0.0
22:30
23:00
from 1820' to 1828' with 10bpm at 765
psi and work junk basket up and down
in 3' strokes and observe good signs
junk moving into reverse basket.
Prepare to POOH.
2/5/2019
2/6/2019
1.00
COMPZN
POOH from 1828' to surface. Hole
0.0
OA
23:00
00:00
slick, no overpull issues, hole laking
proper displacement.
2/6/2019
2/6/2019
2.00
COMPZN
RPCOMP
BHAH
T
B/D and UD reverse junk basket BHA
0.0
0.0
00:00
02:00
#73, clear and clean rig floor. P/U and
M/U BHA#74 with Baker Overshot
Short Catch dressed with 3-1/2"
grapples and RIH.
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA #74 to 1820'.
0.0
0.0
02:00
03:00
2/6/2019
2/6/2019
1.50
COMPZN
RPCOMP
FISH
T
Attempt to engage fish with BOS at
0.0
0.0
03:00
04:30
1828' and utilizing pump to try and
wash over, pushed/washed fish down
to 1833' washing down to 1844' with
15k set down weight and 5bpm at 225
psi. Prepare to POOH.
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH with BOS BHA#74 to surface
0.0
0.0
04:30
05:30
and inspect overshot, wear observed
starting into the overshot but not to the
grapple. Re -dress BOS and paint the
bottom of the BOS and RIH with BHA
#75
2/6/2019
2/6/2019
0.50
COMPZN
RPCOMP
FISH
T
M/U BHA# 75 with Baker overshot
0.0
0.0
05:30
06:00
RIH and t/ 1834' latch up on fish
POOH No fish redress over shot RIH
W/ BHA # 75
Page 24138 Report Printed: 2/2112019
Operations Summary (with Timelog Depths)
a
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
start Depth
Ste t Time
End Time
our (hr)
Phase
Op Cotle
Activity Code
Time P -T -X
Operation
(WB)
End OepN (WB)
2/6/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA #75 to 1820'.
0.0
0.0
07:00
2/6/2019
0.50
COMPZN
RPCOMP
FISH
T
Attempt to engage fish with BOS at
0.0
0.0
07:30
1844' and utilizing no pump, squat 15k
down and pick up length of bumper
E2/6/20199
sub and set 15k back down x 3 times
at 1844' with 15k set down weight,
pick up T to 1841 and observe 2-3k
overfull. Prepare to POOH.
2/6/2019
1.50
COMPZN
RPCOMP
TRIP
T
Break TDS connection and blow out
0.0
0.0
07:30
09:00
Kelly, notice pipe full, good sign fish is
engaged. POOH with 2-3k over initial
string weight from 1841'to surface.
FISH at surface at 09:00 hrs.
2/6/2019
2/6/2019
0.50
COMPZN
RPCOMP
SHAH
T
B/D and UD BHA #75, BOS and 5-
0.0
0.0
09:00
09:30
314" string mill fish.
2/6/2019
2/6/2019
0.50
COMPZN
RPCOMP
SHAH
P
PIU and M/U Baker cutter assembly
0.0
0.0
09:30
10:00
and RIH with BHA $76.
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
TRIP
P
RIH with Baker cutting assembly BHA
0.0
0.0
10:00
11:00
#76 to 1758'.
2/6/2019
2/6/2019
0.50
COMPZN
RPCOMP
CUTP
P
S/O from 1758' to 1777' and M/U TDS,
0.0
0.0
11:00
11:30
P/U to 1769' and record parameters, 3
bpm at 365 psi, 1 bpm at 63 psi, S/O
at 55k P/U at 55k. S/O f/ 1769' to
1783' at 1 bpm at 365 psi, P/U to
1769' and increase pump to 4 bpm
and SIO from 1769'to 1778' and
observe cutters tag up on collar
connection in 7", PM to 1770' and SIO
to 1778' and verify connection in 7".
Shut down pumps and pick up to cut
depth at 1748'. Bring up pumps to 5
bpm at 880 psi and engage TDS at 60
rpm at 1,200 ft/lbs torque and observe
cutters engaging 7" with 2,000 f 1lb
torque and 900 psi for 30 rotations
and pressure drop to 680 psi and
torque drop to 1,200 tVlbs, slack off
10th of a foot to observe 1 k WOB for 5
minutes with weight drilling off, slack
off another 10th of a foot and observe
1 k WOB for 5 minutes, rotated with
cutter total of 15 minutes. All indication
good cut. Circulated a total of 1.5
bottoms from moment of cut, no Arctic
Pack Observed at surface.
2/6/2019
2/6/2019
0.50
COMPZN
RPCOMP
OWFF
P
Observe Well for Flow 10 minutes.
0.0
0.0
11:30
12:00
Well Static.
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
TRIP
P
B/O TDS and blow down Kelly. POOH
0.0
0.0
12:00
13:00
with BHA#76 from 1748'to surface
and inspect stabilizer and Baker
casing cutter. No abnormal wear
observed on cutter, all indications we
have a clean cut.
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
BHAH
P
BID and UO BHA#76 Baker casing
0.0
0.0
13:00
14:00
cutter assembly. P/U and M/U BHA
#77 Baker 7" pack off, 7" spear,
bumper sub and jars and RIH.
2/6/2019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#76 to 420.
0.0
0.0
14:00
14:30
Page 25138 Report Printed: 2121/2019
Operations Summary (with Timelog Depths)
2T-22
1 K111117 -1=P, 60 1
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
StartTime
End Tim.
Dur (hu
Phase
Op Code
Activity Code
Time P -T -X
Operation
ni
Ertl Depth otKe)
2/6/2019
2/6/2019
1.00
COMPZN
RPCOMP
FISH
P
M/U TDS and record parameters, 1
0.0
0.0
1430
15:30
bpm at 60 psi and slack off from 420'
to 424' and engage 7" casing cut
observing pressure build to 110 psi,
shut off pump and squat down on fish
with 15k down and work bumper sub
back down onto fish 3 times and pick
up. Original P/U 55k, pick up with fish
at 110k and space out drill pipe in
stack to close Annular.
2/6/2019
2/6/2019
7.50
COMPZN
RPCOMP
CIRC
P
Close Annular with fish engaged at
0.0
0.0
1530
23:00
424' with bottom of 7" cut at 1747' and
lined up to take returns though Braden
Head line to choke house / Tiger
Tanks. Bring on LRS with heated Brine
80 bbls ahead, followed by 42 bbls
heated Diesel, followed by 75 bbls
heated Brine and spot Diesel in 7" and
9-5/8" Annulus.
2/6/2019
2/7/2019
1.00
COMPZN
RPCOMP
OWFF
P
Start Clean up all pits and start
0.0
0.0
23:00
00:00
building clean 9.3 brine in pits
Allow the diesel to soak on 7 X 9 5/8
Annulus
2/7/2019
2/7/2019
3.00
COMPZN
RPCOMP
CLEN
P
Continue clean up all pits and start
0.0
0.0
00:00
03:00
building clean 9.3 brine in pits
Allow the diesel to soak on 7 X 9 5/8
Annulus
2/7/2019
2/7/2019
1.50
COMPZN
RPCOMP
CIRC
P
Start displace well with clean 9.3 ppg
0.0
0.0
03:00
04:30
brine @ 6 bbls min w/320 psi taking
all returns to flow back tank Shut down
and monitor well 15 mins All good
2/7/2019
2/7/2019
5.00
COMPZN
RPCOMP
PULD
P
POOH slow and stand back 4 stand of
0.0
0.0
04:30
09:30
HT 38 D.P and UD Baker Spear and
UD 7" casing
2/7/2019
2/7/2019
1.00
COMPZN
RPCOMP
BHAH
P
P/U and M/U 7" polish mill assembly
0.0
0.0
09:30
10:30
and RIH with BHA#77.
2/7/2019
2/7/2019
1.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#77 tp 409' and tag up
0.0
0.0
10:30
11:30
iwith 5k down, work tight spot, POOH.
2/7/2019
2/7/2019
2.00
COMPZN
RPCOMP
BHAH
P
B/D and UO BHA#77 and P/U and
0.0
0.0
11:30
13:30
M/U 2 x 8-1/2" string mill assembly in
tandem and RIH with BHA#78.
2/7/2019
2/7/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#78 to 399' and take 2k
0.0
0.0
13:30
14:00
bobbles of weight down.
2/7/2019
2/7/2019
4.00
COMPZN
RPCOMP
MILL
P
P/U and establish parameters, 5bpm
0.0
0.0
14:00
18:00
at 600 psi, 60 rpm at 1,200 ft/lbs of
torque, Mill/Drift/Wash down from 399'
to 436' with 1,200 to 4,000 ft/lbs of
torque and start taking weight again at
436', Mill/Drift/Wash from 436' to 447'
with 1,200 to 4,000 ft/lbs at 60 rpm at
2-5 bpm with 200 to 600 psi. Continue
to RIH drifting 9-5/8" casing with
tandem 8-1/2" mill assembly.t/ 447'
POOH due to high torque
2/7/2019
2/8/2019
6.00
COMPZN
RPCOMP
MILL
P
C/O BHA# 79 and Make BHA# 80
0.0
1800
0000
RIH with 8 3/8" mill t/ 1748' to top of 7"
stub with no issues POH and UD BHA
# 80 M/U BHA #81 with a single 8.5
Mill RIH to 449' tag up Start Mill/Wash
down t/456' PUW 45 SOW 40 ROT 45
Tq 800-1800 ft
Page 26/38 Report Printed: 2/2112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
stall Depth
Ste" Time
EiW Tene
Dur (hr)
Phase
Op code
A00ty Code
Time P -T -X
Operation
(itKe)
End Depen (MB)
2/8/2019
2/8/2019
7.50
COMPZN
RPCOMP
REAM
P
RIH to 449'tag up Start MiIIPNash
0.0
0.0
00:00
07:30
down 0456'. Ream Through 3X no
issues PUW 45 SOW 40 ROT 45 Tq
800-1800 ft WOM 1-2k Clean up @
0030 Continue RIH and tag up @
1748', hole slick and clear from 456'
down to top of 7" cut. Prepare to
POOH.
2/8/2019
2/8/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH with BHA#81 from 1748', no
0.0
0.0
07:30
08:30
issues going through tight spots from
456' to 392'.
218/2019
2/8/2019
0.50
COMPZN
RPCOMP
BHAH
P
B/D and LID BHA #81. P/U and M/U
0.0
0.0
08:30
09:00
BHA#82 8-1/2" tandem mills on 6-
1/4" DCs with 8' flex joint between the
mills and RIH.
202019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#82 to 407' with no
0.0
0.0
09:00
09:30
issues going in hole.
2/8/2019
2/8/2019
1.50
COMPZN
RPCOMP
MILL
P
Tag up @407' Milling/Reaming f/407
0.0
0.0
09:30
11:00
t/452' pass with 1 - 5 bpm 200 psi to
600 psi, PUW 45 SOW 40 ROT 45, Tq
800-3800 ft WOM 1-2k fro 3X without
getting through below 452' without
laking over 5k WOM. Prepare to
POOH.
2/8/2019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH with BHA #82 from 1748', no
0.0
0.0
11:00
11:30
issues going through tight spots from
456' to 392'.
2/8/2019
2/8/2019
0.50
COMPZN
RPCOMP
SHAH
P
BID and LID BHA#82. P/U and M/U
0.0
0.0
11:30
12:00
BHA#83 8-1/2" tandem mills on 6-
1/4" DC with flex joint removed, sorter
assembly and RIH.
2/8/2019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#83 to 407' with no
0.0
0.0
1200
12:30
issues going in hole.
2/8/2019
2/8/2019
2.00
COMPZN
RPCOMP
MILL
P
Tag up @407' Milling/Reaming f/407
0.0
0.0
1230
14:30
0455' pass with 1 - 5 bpm 200 psi to
600 psi, PUW 45 SOW 40 ROT 45, Tq
800-3800 ft WOM 1-2k fro 5X without
getting through below 455' without
taking over 5k WOM. Prepare to
POOH.
2/8/2019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH with BHA#83 from 1748', no
0.0
0.0
14:30
15:00
issues going through tight spots from
456' to 392'.
2/8/2019
2/8/2019
0.50
COMPZN
RPCOMP
BHAH
P
BID and LID BHA#83. P/U and M/U
0.0
0.0
15:00
15:30
BHA#84 8-318" x 8-1/2" tandem mills
flexible on DP without 6-14" DC and
RIH.
2/812019
2/8/2019
0.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#84 to 407' with no
0.0
0.0
15:30
16:00
issues going in hole.
2/8/2019
2/8/2019
2.00
COMPZN
RPCOMP
MILL
P
Tag up @407' Milling/Reaming f/407
0.0
0.0
16:00
18:00
0457' pass with 1 - 5 bpm 200 psi to
600 psi, PUW 45 SOW 40 ROT 45, Tq
800-3800 ft WOM 1-2k fro 3X wiping
out fight spots until smooth. Continue
RIH and lag up @ 1748', hole slick
and clear from 456' down to lop of 7"
cut. Prepare to POOH.
2/8/2019
2/8/2019
3.00
COMPZN
RPCOMP
MILL
P
RIH with BHA # 85 Tag up @ 453'
0.0
18:00
21:00
PUW 45 SOW 40 ROT 45 Ream /mill
F/ 453T/ 456' 800 - 2700 ft WOB 1=3
POOH
2/8/2019
2/9/2019
3.00
COMPZN
RPCOMP
MILL
P
M/U BHA# 86 with 1 6 1/4" D.0 w/ 8
21:00
00:00
1/2" X 8 1/2" Mills RIH Tag up @ 410
Ream F/ 410 -450 w/ 1-3 WOB
Page 27/38 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
/
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Sten Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
A vdy Code
Time P -T -X
Opeiatlon
(@KB)
End Depth (ftKB)
2/9/2019
2/9/2019
2.50
COMPZN
RPCOMP
MILL
P
Continue to dress @ 410 Ream F/
0.0
0.0
00:00
02:30
410 -450 w/ 1-3 WOB pass/drift 3X
2/9/2019
2/9/2019
2.00
COMPZN
RPCOMP
TRIP
P
Continue RIH to top of 7" stub @
0.0
0.0
02:30
04:30
1748' with no issues POOH
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
BHAH
P
UD BHA# 86 and M/U BHA# 87 w/
0.0
0.0
04:30
05:30
Baker Mill shoe 8-1/8" polish mill with
Hydro Jars and RIH to clean off top of
7" casing stub
2/9/2019
2/9/2019
2.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#87 and tag up at 435'
0.0
0.0
05:30
07:30
and attempt to get mill down without
success, POOH from 435'to surface.
2/9/2019
2/9/2019
0.50
COMPZN
RPCOMP
BHAH
P
B/D and UD BHA #87 and prepare to
0.0
0.0
07:30
08:00
slip and cut drilling line.
219/2019
2/9/2019
2.00
COMPZN
RPCOMP
SLPC
P
Rig service, slip and cul drilling line
0.0
0.0
08:00
10:00
and perform tests.
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
BHAH
P
P/U and M/U BHA# 88 w/ Baker Mill
0.0
0.0
10:00
11:00
shoe 8-1/2" mill and RIH.
2/9/2019
2/9/2019
1.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#88 and tag up at 435'
0.0
0.0
11:00
12:30
and mill down to 500', POOH from
500'to surface. no overpull issues.
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
BHAH
P
BID and UD BHA#88, PIU and M/U
0.0
0.0
12:30
13:30
BHA#89 w/ Baker Mill shoe 8-1/8"
polish mill without Hydro Jars and RIH
to clean off top of 7" casing stub.
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#89 and lag up at 435'
0.0
0.0
13:30
14:30
and attempt to get mill down without
success, POOH from 435'to surface.
219/2019
2/9/2019
1.00
COMPZN
RPCOMP
BHAH
P
B/D and UD BHA #89, PIU and M/U
0.0
0.0
14:30
15:30
BHA#90 w/ 8-314" string mill limber on
drill pipe and RIH to dress 7" casing
from 427' to 448'.
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#90 and slack off
0.0
0.0
15:30
16:30
through 400' to 560' without any tag
ups with 8-3/4" mill on drill pipe.
Prepare to POOH. POOH with BHA
#90, hole slick no overpull spots, well
taking proper displacement.
2/9/2019
2/9/2019
1.00
COMPZN
RPCOMP
BHAH
P
B/D and UD BHA #90, PILI and M/U
0.0
0.0
16:30
17:30
BHA #91 with tandem 8-1/2" x 8-3/4"
string mills limber on drill pipe and RIH
to dress 7" casing from 350'
2/9/2019
2/10/2019
6.50
COMPZN
RPCOMP
TRIP
P
Tag up at 350' Ream and Mill F/ 350-
0.0
0.0
17:30
00:00
440' PU W 43K SOW 41 K ROT 38K @
7 BBLS 200 PSI
2/10/2019
2/10/2019
2.50
COMPZN
RPCOMP
MILL
P
Continue Ream and Milling F/ 440'
0.0
0.0
00:00
02:30
T/460' PUW 43K SOW 41 K ROT 38K
WOB 1-3K @ 7 BBLS 200 PSI drift F/
3507/490 with no issue.Eslimate 250
Ib metal shavings f/ 9 518" casing
2/10/2019
2/10/2019
2.50
COMPZN
RPCOMP
TRIP
P
POOH and check BHA# 91 Both mills
0.0
0.0
02:30
05:00
in gage M/U BHA# 92 and Add 1
Stand 6 1/4" D.0 RIH and drift T1485'
No issue POOH UD mills
2/10/2019
2/10/2019
1.00
COMPZN
RPCOMP
TRIP
P
M/U BHA# 93 with Baker 7" mill Shoe
0.0
0.0
05:00
06:00
8 1/8" RIH Dress off top of 7" casing
stub@ 1748'.
2/10/2019
2/10/2019
2.00
COMPZN
RPCOMP
MILL
P
Dress off top of 7" casing stub@
0.0
0.0
06:00
08:00
1748', reamed 7" times, pumped
sweep out of well, clean returns.
2/10/2019
2/10/2019
2.00
COMPZN
RPCOMP
TRIP
P
POOH with BHA #93 to surface
0.0
0.0
08:00
10:00
1
2/10/2019
2/10/2019
2.00
COMPZN
RPCOMP
BHAH
P
BID and UD polish mill assembly,
0.0
0.0
10:00
12:00
1
I
I
clear and clean rig floor.
Page 28/38 Report Printed: 212112019
Operations Summary (with Timelog Depths)
2T-22
•
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
StartTime
EM Time
our (m)
Phase
Op Code
Activity Code
Time P -T -X
Operabon
(WEI)
End Depth(WS)
2/10/2019
2/10/2019
1.00
COMPZN
RPCOMP
PULD
P
Make up wear bushing puller on joint
0.0
0.0
12:00
13:00
of DP and retrieve/pull wear bushing
and lay out same.
2/10/2019
2/10/2019
1.00
COMPZN
RPCOMP
CIRC
P
P/U and M/U jet sub and magnet and
0.0
0.0
13:00
14:00
jet well head and BOPE two cycles,
B/D and UD magnet and jet sub, 2 lbs
of metal recovered.
2/10/2019
2/10/2019
0.50
COMPZN
RPCOMP
SFTY
P
PJSM, rig up Weatherford and
0.0
0.0
14:00
14:30
prepare to pick up Baker Casing patch
with Halliburton stage tool assembly
and RIH picking up 7" casing.
2/10/2019
2/10/2019
0.50
COMPZN
RPCOMP
RURD
P
Rig up Weatherford, change elevators,
0.0
0.0
14:30
15:00
prepare handling equipment and P/U
Baker casing patch and inspect and
RIH set slips in rotary.
2/10/2019
2/10/2019
6.00
COMPZN
RPCOMP
RCST
P
P/U and M/U HYD563 7" 26# L-80
0.0
0.0
15:00
21:00
rasing to 9.4001V1bs torque and RIH
34 joints, 1 x 8' pup, 1 x 10' pup, 1 x
20' pup, and 6 joints with centralizers
every other joint down to 1748' and
engage 7" casing cut and swallow
down to 1751' shoe depth and set
down 10k, pick up to neutral and set
rotary slips, stage tool depth at 1737'.
RIH t/ 1748' SOW 67K PU 10K over
2/10/2019
2/11/2019
3.00
COMPZN
RPCOMP
CMNT
P
R/U Halliburton Cement Head and
0.0
21:00
00:00
load Plug Hold PJSM w/ SLB Cement
Crew and test 7" casing it 2500 psi OK
Continue pressure up U 3300 psi shift
open stage tool CBU @ 5 bbls min w/
180 psi
2/11/2019
2/11/2019
4.00
COMPZN
CEMENT
CMNT
P
Line up SLB Cement unit to rig floor
0.0
O.0
00:00
04:00
and start pumping 5 bbls water ahead
and shut down and test lines t/
3000psi ok cont pumping 60 bbls 15.7
ppg ASI cement @ 4 bbls shut down
drop Halliburton wiper plug and chase
w/ 1.5 bbls cement 3.5 bola water @ 4
bbls min shut down displace w/ 9.3
brine w/ rig pump @14 bible min and
54.5 bbls and bump plug and test to
2550 and Gose cement tool and open
up and check tool bleed off to 0 psi w/
no flow back Blow Down flow back
tank CIP @ 00:30 1 bbl cement Back
Clean up Stack Flush out all lines.
R/D Cement head and go to phase 3
stand by.
2/11/2019
2/11/2019
8.00
COMPZN
RPCOMP
WAIT
P
Wait on weather phase 3 conditions
0.0
0.0
04:00
12:00
2/11/2019
2/11/2019
1.00
COMPZN
RPCOMP
NUND
P
Nipple down BOPE and pick up stack
0.0
0.0
12:00
13:00
T and clean well head housing, center
7" rasing in well head.
2/11/2019
2/11/2019
1.00
COMPZN
RPCOMP
W WSP
P
Set C-22 slips engaged with 40 kips
0.0
0.0
13:00
14:00
down.
2/11/2019
2/11/2019
1.00
COMPZN
RPCOMP
NUND
P
Cut 7" joint and lay out, nipple down
0.0
0.0
14:00
15:00
DSA on BOP and rack back BOP.
2/11/2019
2/11/2019
1.00
COMPZN
RPCOMP
W WSP
P
Dress 7" cut and set pack off.
0.0
0.0
15:00
16:00
2/11/2019
2/11/2019
2.00
COMPZN
RPCOMP
NUND
P
P/U and N/U 7-1/6" 5M x 11" 3M
0.0
0.0
16:00
18:00
1
1
Tubing head and test pack off to 2,800
psi, tested good.
Page 29138 Report Printed: 2/2112019
` Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
start Depth
sold Time
ErMTim9
Dur(hr)
Phase
Op Code
Activit' Code
Time P -T -X
Operimon
(RKS)
End Deplh(RKB)
2/11/2019
2/12/2019
6.00
COMPZN
RPCOMP
NUND
P
Nipple up BOP with DSA and Spool 7-
0.0
0.0
18:00
00:00
1/16" 5M x 11" 5M x 13-5/8" 5M and
torque bolts. Change out LPR from 7"
to 2-7/8" x 5" VBR and prepare BOPE
to pressure test.
2112/2019
2/12/2019
1.50
COMPZN
RPCOMP
RURD
P
PJSM R/U Test equipment f/ BOP lest
0.0
0.0
00:00
01:30
2/12/2019
2/1212019
9.50
COMPZN
RPCOMP
BOPE
P
Testing BOP t/ 250/2500 PSI AOGCC
0.0
0.0
01:30
11:00
Witness waived Bob Noble @2-11-19-
6:67PM E -Mail
#1 B.R CMV 1,2,3,16 demcoKill # B.R.
CMV 4,5,6.HCR Kill,IBOP #3 BY
CMV 7,8,9,#2 Manual Kill ,Lower Kelly
ValveTD #4 Super CH,Manual CH .#5
B.R CMV 10,11,HCR Kill w/Floor dart
valve #6 B.R CMV 12,13, TIW valve #
7 Annular,CMV 15,12,13 #8 UPR
CMV #9 UPR HCR choke ,#10 UPR
Manual Choke #11 Lower P.R. and
#11 Koomey Test
Due to metal in ram cavities, change
out Blind Ram element top seal on
Drillers side while pressure testing
choke manifold.
2/12/2019
2/12/2019
1.00
COMPZN
RPCOMP
RURD
P
Pull wear bushing and lay out, lay out
0.0
0.0
11:00
12:00
test joint, test alarms system, and
clear and dean rig floor.
2/12/2019
2112/2019
1.00
COMPZN
RPCOMP
RURD
P
P/U wear bushing running tool and set
0.0
0.0
12:00
13:00
wear bushing and run in lock down
screws. UD assembly, clear and clean
dg floor and prepare to PIU and RIH
with DP picking up from pipe shed.
2/12/2019
2/13/2019
11.00
COMPZN
RPCOMP
TRIP
P
P/U Mule Shoe and RIH picking up DP
0.0
0.0
13:00
0000
singles out of pipe shed to 1600',
POOH racking back DP.Repeat 4X
2/13/2019
2/13!2019
3.00
COMPZN
RPCOMP
PULD
P
Finish RIH picking up OP singles out
0.0
0.0
00:00
03:00
of pipe shed to 1600', POOH racking
back DP.Repeat 4 X
2/132019
2/13/2019
3.00
COMPZN
RPCOMP
BHAH
P
P/U and M/U 6 1/8" Mill Tooth Bit Re-
0.0
0.0
03:00
06:00
Run, bit sub and 4-3/4" D,C, BHA #94
and P/U the last 42 joints DP f/ pipe
shed and RIH to 1628'.
2113/2019
2/1312019
1.00
COMPZN
RPCOMP
WASH
P
M/U TDS and break circulation, pick
0.0
0.0
06:00
07:00
up and record parameters, P/U 60k
SIO 58k, 400 gpm at 880 psi, 35 rpm
1,100 fl/fibs, bs, RIH washing and reaming
down from 1628' and take 1k bobbles
in green cement top at 1655'.
2/132019
2/13/2019
1.00
COMPZN
RPCOMP
COCF
P
Continue washing and reaming in the
0.0
0.0
07:00
08:00
hole from 1655'to 1733', P/U 60k SID
58k, 400 gpm at 880 psi, 35 rpm 1,100
to 1,400 fUlbs. Drill hard cement with 1
-2k WOB from 1733' to 1734' and drill
plug with 5-6k WOB from 1734' to
1734.7' and drill stage tool aluminum
with 2-6k WOB from 1734.7' to 1735.4'
and break through slacking off
washing and reaming down to 1737'
and taking 5k WOB, ream through
down to 1739' with slick and clean
parameters.
Page 30138 Report Printed: 212112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
Start Depth
MKB)
End Depth (ftKB)
2/13/2019
2/13/2019
1.00
COMPZN
RPCOMP
WASH
P
PIU from 1739' back reaming and
0.0
0.0
08:00
09:00
washing to 1628' and back to 1739'
three limes, slick and clear through
stage tool. Continue to RIH PIU 60k
SIO 58k, 400 gpm at 880 psi, 35 rpm
1,100 ft/lbs from 1739'to 1810' and
take 5k tag up, work up and back
down in an attempt to move
obstruction down hole, solid with 5k
Pet down.
2/13/2019
2/13/2019
1.50
COMPZN
RPCOMP
MILL
P
Mill on plug and shift tool material at
0.0
0.0
0900
1030
1810' down to 1813' with 1-1 Ok WOB
P/U 60k S/O 58k, 400 gpm at 880 psi,
35 rpm 1,100 - 1,500 f 1lbs, working
up through several times and
continued varying parameters in an
attempt to drill/mill through
obstruction. From 1810' to 1811' there
was rubber plug material coming back,
from 1811'to 1813'there was
aluminum coming over shakers and
still trace cement fines.
2/13/2019
2/13/2019
0.50
COMPZN
RPCOMP
WASH
P
Wash down from 1813'to 1844' with
0.0
0.0
10:30
11:00
only a few bobbles on weight, wash
and ream down to top of sand from
1844' down to 1848' and pick up to
1840' and circulate bottoms up at 400
gpm.
2/13/2019
2/13/2019
0.50
COMPZN
RPCOMP
CIRC
P
At 1840', circulate hole clean with 400
0.0
0.0
11:00
11:30
gpm at 1,200 psi, good returns of frac
sand over shakers with good metal
shavings, shaker's clean on bottoms
up.
2/13/2019
2/13/2019
1.00
COMPZN
RPCOMP
RURD
P
Pull up and break stand and rack
0.0
0.0
11:30
12:30
back, blow down Kelly and lines. Rig
up head pin in string and break
circulation through string.
2/13/2019
2/13/2019
1.00
COMPZN
RPCOMP
PRTS
P
Close UPR on 3-1/2" DP, pumping
0.0
0.0
12:30
13:30
down kill line and string, pressure up
7" 26# L-80 casing with bit at 1813' to
2,500 psi at 0.25 bpm and hold for 30
minutes pressure end at 2,450 psi.
1.25 bbls pumped, bled back 1.25 bbls
to 0 psi. Good Test.
2/13/2019
2/13/2019
0.50
COMPZN
RPCOMP
RURD
P
Open UPR, rig down surface lines,
0.0
0.0
13:30
14:00
blow down lines, prepare to POOH.
Note: PJSM with derrick man, -50°
with wind chill, risk assessment
concluded heater in shelter is
sufficient t0 keep derrick man warm,
tripping out of the hole speeds slow
enough to give derrick man 3 minutes
to warm up with only 3 minutes out
side to rack back each stand.
2/13/2019
2/13/2019
2.00
COMPZN
RPCOMP
TRIP
P
POOH with BHA #94 clean out bit
0.0
0.0
14:00
16:00
assembly from 1813' to surface
racking back stands and DC's.
2/13/2019
2/13/2019
0.50
COMPZN
BHAH
P
B/D and UD BHA #94 clean out
0.0
0.0
16:00
16:30
assembly and P/U and M/U BHA#95
JRPCOMP
Baker Reverse Junk Baskel assembly
and RIH.
Page 31138 Report Printed: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
StaM1 Time
End Time
Dur (hr)
PhewOp
cwe
Activity Code
Time P-T-X
Operation
Start Depth
(Aka)
End Depth (flKB)
2/13/2019
2/13/2019
4.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#95 RJB assembly to
0.0
0.0
16:30
20:30
1846' and M/U TDS and record
parameters, P/U 60k S/O 58k, 400
gpm at 880 psi. Attempt Reverse Junk
in basket wash F/ 1846"1850 No Go
set down 10K POOH @ 1638 over
pull 40K
2/13/2019
2/13/2019
2.00
COMPZN
RPCOMP
JAR
T
Continue Working string PUW 60K
0.0
0.0
20:30
22:30
SOW 30K Attempt to Tq and jar
Through tight spot @ 1638' No
movement Set Jar off F/ 40K over t/
75 over No go slump and Tq No go
Decision was made to make Blind
Back off work Tq down up V 7500 V
10000 Ib Back off @ 10000 5 turns
PUW @ 60K. Break TDS and prepare
for DROPS inspection.
2/13/2019
2/14/2019
1.50
COMPZN
RPCOMP
TRIP
T
Hold derrick Inspection due to jarring
0.0
0.0
22:30
00:00
Continue POOH stand back work-
string and Ckecking All Connections
2/14/2019
2/14/2019
3.00
COMPZN
RPCOMP
TRIP
T
POOH with backed off pipe and
0.0
0.0
00:00
03:00
observe good back off at 3-1/2" IF
Connection at Junk Mill Basket, set
back BHA#96
2/14/2019
2/14/2019
1.00
COMPZN
RPCOMP
BHAH
T
P/U and M/U double acting drilling
0.0
0.0
03:00
04:00
Jars and 9 more 4-3/4" DCs and RIH
with BHA#97
2/14/2019
2/14/2019
2.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#97 and engage top of
0.0
0.0
04:00
06:00
fish at 1630' and screw into the fish
with 6 turns to the right at 5,600 ft/lbs
torque with 1/2 tum back, P/U and
observe fully engaged into the fish.
Note: PJSM with derrick man, -52°
with wind chill, risk assessment
concluded heater in shelter is
sufficient to keep derrick man warm,
tripping out of the hole speeds slow
enough to give derrick man 3 minutes
to warm up with only 3 minutes out
side to rack back each stand.
2/14/2019
2/14/2019
5.00
COMPZN
RPCOMP
JAR
T
Jar on fish attempting to hit jars down,
0.0
0.0
06:00
11:00
unsuccessfully. Attempted 10 times to
get jars to fire up and down, warming
them up with 100k overpull and 50k
set down, Weatherford Jars set*
HT54106-IV. Prepare to POOH while
ordering mechanical jars and surface
jars.
2/1412019
2/14/2019
2.00
COMPZN
RPCOMP
TRIP
T
Perform mechanical back off, 6.25
0.0
0.0
11:00
13:00
turns to the left with .25 turns back,
P/U and observe free from fish. POOH
with BHA #97
2/14/2019
2/14/2019
1.00
COMPZN
RPCOMP
BHAH
T
BIO and L/D BHA#97, lay down
0.0
0.0
13:00
14:00
Weatherford jars and prepare to pick
up BHA #98
2/14/2019
2/14/2019
8.00
COMPZN
RPCOMP
SVRG
T
Service rig, clear and clean rig floor,
0.0
0.0
14:00
22:00
perform PMs, and lay out completion
string in pipe shed, drift, strap, and
tally while waiting on Jars and
intensifiers.
2/14/2019
2/15/2019
2.00
COMPZN
RPCOMP
SHAH
T
M/U and Strap BHA#98 With New
0.0
0.0
22:00
00:00
Drilling Jars
RIH w/ 3-1/2" HT38 workstdng T/ top
fish @ 1633'
Page 32138 Report Printed: 2/2112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Depth
Stan Time
End Time
our (hr)
Phase
Op Dose
Activity Code
Time P -T-%
Operation
(eKB)
End Depth (WS)
2/15/2019
2115/2019
2.00
COMPZN
RPCOMP
TRIP
T
RIH w/ 3-1/2" HT38 DP workstring T/
0.0
0.0
00:00
02:00
top fish @ 1633'
2/1512019
2/15/2019
2.00
COMPZN
RPCOMP
JAR
T
Tag Fish @ 1633 Screw in to fish
0.0
0.0
02:00
04:00
PUW 62K SOW 60K Attempt to jar fish
free NO GO Drilling Jars NO GO and
used Baker Bumper sub to Attempt to
jar down, No go Back off fish, POOH.
2/15/2019
2/15/2019
1.00
COMPZN
RPCOMP
BHAH
T
UD Weatherford Jars and BHA#98
0.0
0.0
04:00
05:00
and M/U BHA#99 with screw-in sub,
accelerator, bumper sub and RIH.
211512019
2/15/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH to 1620' and space out string to
0.0
0.0
05:00
06:00
1
1
1 make up surface jars.
2115/2019
2/15/2019
1.00
COMPZN
RPCOMP
BHAH
T
PJSM, Make up surface jars and cross
0.0
0.0
06:00
07:00
1
-over's and set surface jars for I 00
over release weight.
2/15/2019
2/1512019
1.00
COMPZN
RPCOMP
JAR
T
Slack off and engage fish at 1633' and
0.0
0.0
07:00
08:00
screw into fish with 4k torque 6 turns
to the right. Pick up 100k over and
surface jars released freeing fish, only
stroked jars once. Engage rotary at 20
rpm with 1,000 ft/lbs torque, pipe free.
2/15/2019
211512019
1.00
COMPZN
RPCOMP
CIRC
T
Circulate at 1640' and pump 20 bbl Hi-
0.0
0.0
08:00
09:00
Vis sweep, only metal shavings and
some cement over shakers, shakers
dean up after sweep.
2/15/2019
2/15/2019
4.00
COMPZN
RPCOMP
TRIP
T
Blow down Kelly. POOH from 1640'
0.0
0.0
09:00
13:00
slow, hole slick from 1640'to 1290'
and lake 1 O over pull, work back
down with 5k to free down, attempt to
pull up with same. P/U single joint of
DP and M/U TDS, engage rotary at 20
rpm at 3,000 Mbs and stalled rotary,
slack down with 5k and free rotary and
pipe, circulate 200gpm and work spot
three limes, slick. Blow down Kelly
and continue POOH on the hook from
1290' to surface, aluminum found on
RJB and 6" long piece of aluminum
from stage tool sleeve retrieved in
basket.
2/15/2019
2/15/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD RJB and fishing
0.0
0.0
13:00
13:30
assembly BHA #99
2115/2019
2/15/2019
0.50
COMPZN
RPCOMP
SVRG
P
Rig service, service TDS and rig, clear
0.0
0.0
13:30
14:00
and clean rig floor.
2/1512019
2/15/2019
1.50
COMPZN
RPCOMP
BHAH
P
P/U and M/U BHA#100, 6-1/8" junk
0.0
0.0
14:00
15:30
mill and 6-1/8" string mill and RIH with
BHA#100 to millldrift cement stage
tool and dress junk on top of sand at
1848'.
2/15/2019
2/15/2019
1.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#100
0.0
0.0
15:30
17:00
2/1512019
2/15/2019
2.50
COMPZN
RPCOMP
WASH
P
PUW 64k SOW 60K ROT 62k Wash
0.0
0.0
17:00
19:30
and ream F/1630' V1861' Mill up junk
F/ 1851 t/1858' Milling on Junk and
sand Pick off bottom and CBU @ 9
bbls wl 1700 PSI POOH
2/1512019
2/15/2019
2.00
COMPZN
RPCOMP
BHAH
P
Clean Magnets off and Check mill All
0.0
0.0
19:30
21:30
good M/U BHA# 101 w/Bakerjunk
Reverse basket.
2/15/2019
2/16/2019
2.50
COMPZN
RPCOMP
TRIP
P
RIH w/ 3-1/2" HT38 D.P Work string
0.0
0.0
21:30
00:00
1
1
F/ 340'T/ 1858'
Page 33/38 Report Printed: 2121/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(NCB)
End Depth (MB)
2/16/2019
2/16/2019
1.00
COMPZN
RPCOMP
WASH
P
Reaming and wash down
0.0
0.0
00:00
01:00
F/18587/1865 w/ baker reverse
Basket PUW 65K SOW 62k ROT 62K
8 BBL w1720 PSI, good sand returns
to shakers, circulate until clean. B/D
TDS and blow down Kelly. Prepare to
POOH.
2/16/2019
2/16/2019
1.00
COMPZN
RPCOMP
TRIP
P
POOH with BHA#101 to surfacefrom
0.0
0.0
01:00
02:00
1864'.
2/16/2019
2116/2019
0.50
COMPZN
RPCOMP
BHAH
P
Clean out reverse basket, boot
0.0
0.0
02:00
02:30
baskets, and Magnet10 Ib on magnet
and reverse basket 7 small pieces and
chunk of aluminum and a few brass
pieces.
2/16/2019
2/16/2019
0.50
COMPZN
RPCOMP
BHAH
P
M/U BHA #102 with same RJB, 2 x
0.0
0.0
02:30
03:00
boot baskets, and 1 magnet and RIH.
2/16/2019
2/1612019
1.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#102 from surface to
0.0
0.0
03:00
04:30
1860' and establish parameters.
2/16/2019
2116/2019
1.00
COMPZN
RPCOMP
WASH
P
Reaming and wash down F/1860'
0.0
0.0
04:30
05:30
T/1873' w/ baker reverse Basket PUW
65K SOW 62k ROT 62K 8 BBL wl720
PSI, good sand with a lot of metal and
aluminum shavings seen at shakers,
pumped a 20 bbl Hi -Ys sweep out of
hole.
2/16/2019
2/16/2019
2.00
COMPZN
RPCOMP
TRIP
P
BID TOS and blow down Kelly. POOH
0.0
0.0
05:30
0730
from 1873'to surface.
2116/2019
2/16/2019
1.00
COMPZN
RPCOMP
BHAH
P
Clean out reverse basket, boot
0.0
0.0
07:30
08:30
baskets, and Magnell0 Ib on magnet
and reverse basket 7 small pieces and
chunk of aluminum and a few brass
pieces and recovered knive blade
from Baker casing cutter.
2/16/2019
2/16/2019
0.50
COMPZN
RPCOMP
BHAH
P
M/U BHA#103 with same RJB, 2 x
0.0
0.0
08:30
09:00
boot baskets, and 1 magnet and RIH.
2116/2019
2/16/2019
2.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#103 from surface to
0.0
0.0
09:00
11:00
1870' and establish parameters.
2116/2019
2/16/2019
2.50
COMPZN
RPCOMP
WASH
P
Reaming and wash down F/1870'
0.0
0.0
11:00
13:30
T/1940' w/ baker reverse Basket PUW
65K SOW 62k ROT 62K 8 BBL wl720
PSI, good sand with a lot of metal and
aluminum shavings seen at shakers,
pumped a 20 bbl Hi -Vis sweep out of
hole.
2/16/2019
2/16/2019
2.00
COMPZN
RPCOMP
TRIP
P
B/D TDS and blow down Kelly. POOH
0.0
0.0
13:30
15:30
from 1940' to surface.
2/1612019
2/16/2019
0.50
COMPZN
RPCOMP
BHAH
P
Clean out reverse basket, boot
0.0
0.0
15:30
16:00
baskets, and Magnetl Ib on magnet
and reverse basket. very little tiny
metal shavings in baskets.
2/16/2019
2/16/2019
1.00
COMPZN
RPCOMP
SHAH
P
BID and UD BHA#103 and PIU and
0.0
0.0
16:00
17:00
M/U BHA#104 with overshot
assembly for pulling IBP and RIH.
2/16/2019
2/16/2019
2.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#104 from surface to
0.0
0.0
17:00
19:00
1
1
11935'and
record parameters.
2/16/2019
2/16/2019
1.50
COMPZN
RPCOMP
WASH
P
Wash down from 1935' to 1969'
0.0
0.0
19:00
20:30
washing sand and engaging IBP
fishing neck, set down and equalize
IBP.
2/16/2019
2/16/2019
0.50
COMPZN
RPCOMP
OWFF
P
Observe well for flow, well static, allow
0.0
0.0
20:30
21:00
IBP to relax before pulling up out of
the hole.
2116/2019
2/16/2019
2.00
COMPZN
RPCOMP
TRIP
P
BID TDS, blow down Kelly and POOH
0.0
0.0
21:00
23:00
with IBP on overshot assembly
Page 34138
Report Printed:
2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Depth
Stan Time
End Time
Our (hr)
Phase
Op Code
A ivly Code
Time P -T -X
Operadon
(KKB)
End Depen(ftKB)
2/16/2019
2/17/2019
1.00
COMPZN
RPCOMP
BHAH
P
B/D and UD BHA#104 and IBP and
0.0
0.0
23:00
00:00
lay out. P/U and MIU BHA#105 with
Baker Overshot dressed with 4-9/16"
grapple to RIH and engage 3-1/2"
completion string fish.
2/17/2019
2117/2019
1.50
COMPZN
RPCOMP
TRIP
P
RIH with BHA#105 from 25'to 1917'
0.0
0.0
00:00
01:30
and M/U TDS and break circulation.
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
FISH
T
PUW 60K SOW 58K pump rate @ 5
0.0
0.0
01:30
02:30
bbl min w/ 250 psi. Attempt to engage
fish at 1983' w/ baker short catch over
shot. Attempted 3 times without
success. Observe well for flow and
Blow DownTDS. Prepare to POOH to
inspect overshot.
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH from 1983' with BHA#105 and
0.0
0.0
02:30
03:30
stand back 3-1/2" work -string, inspect
overshot, observe engaging the fish
with wear marks but grapples did not
engage.
2/17/2019
2/17/2019
0.50
COMPZN
RPCOMP
SHAH
T
UD BHA#105 with short catch
0.0
0.0
03:30
04:00
overshot and PIU short spear (18"to
shoulder) and RIH with BHA #106.
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
TRIP
T
RIH with BHA#106 from 25to 1983'.
0.0
0.0
04:00
05:00
1
1
1 M/U TDS and record parameters.
2/17/2019
2/17/2019
0.50
COMPZN
RPCOMP
FISH
T
PUW 60K SOW 58K pump rate @ 5
0.0
0.0
05:00
05:30
bbl min w/ 250 psi. Attempt to engage
fish at 1983'w/ baker short spear and
observe fish engaged with 10k down
on 2nd attempt. Pick up to 20k
overpull and observe jars fire and fish
dropped off of spear. Attempted 3
times without success. Observe well
for flow. Blow DownTDS. Prepare to
POOH to inspect spear.
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
TRIP
T
POOH from 1983' with BHA #106 and
0.0
0.0
05:30
06:30
stand back 3-1/2" work -string, inspect
spear, observe engaging the fish with
wear marks but notice fish was
bottoming out on spear's shoulder with
only leading edge of grapple engaged.
2/17/2019
2/17/2019
0.50
COMPZN
RPCOMP
BHAH
T
B/D and UD BHA#106 and P/U and
0.0
0.0
06:30
07:00
M/U long spear assembly (24" to
spear shoulder) and RIH with BHA
#107 to 25'.
2/17/2019
2/17/2019
0.50
COMPZN
RPCOMP
SVRG
T
PJSM, service rig and TDS.
0.0
0.0
07:00
07:30
2/17/2019
2/17/2019
1.50
COMPZN
RPCOMP
TRIP
T
RIH with BHA#107 from 25'to 1983'.
0.0
0.0
07:30
09:00
M/U TDS and record parameters.
2/17/2019
2/17/2019
0.50
COMPZN
RPCOMP
FISH
P
PUW 60K SOW 58K. Engage fish at
0.0
0.0
09:00
09:30
1983' and swallow to 11985'w/ baker
long spear and observe fish engaged
with 5k down, pick up to 20k over and
allow jars to bleed off, pick up to 11 Ok
PUW with 50k overpull equaling
estimated fish weight.
2/1712019
2/17/2019
1.50
COMPZN
RPCOMP
TRIP
P
POOH with fish on BHA#107 racking
0.0
0.0
09:30
11:00
back 3-1/2" DP from 1985' spear
depth to surface, fish engaged to
spear shoulder (Fish neck on GLM
measured at 4.25" instead of 4.36" as
per SLB fishing diagram).
Page 35/36 Report Printed: 212112019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS 7ES Job: RECOMPLETION
Time Log
Stan Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-%
Operation
Start Depth
(ftKB)
Entl Depth(ftKB)
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
SHAH
P
PJSM, rig up double stack power
0.0
0.0
11:00
12:00
tongs, B/D and L/D fishing BHA#107
and break pup joint below GLM #6
and lay out, lay fishing tools and
prepare to POOH with 3-1/2"
completions string.
2/17/2019
2/17/2019
10.00
COMPZN
RPCOMP
PULL
P
POOH with 3-1/2" completions from
0.0
0.0
12:00
2200
7740' bottom cut depth laying out
tubing and GLMs and strapping tubing
before laying outside to lay down area.
2/17/2019
2/17/2019
1.00
COMPZN
RPCOMP
RURD
P
PJSM, rig down tubing tongs, clear
0.0
0.0
22:00
2300
and clean rig floor. Prepare to pick up
casing scraper and clean out BHA.
2/17/2019
2/18/2019
1.00
COMPZN
RPCOMP
SHAH
P
PJSM, P/U and M/U Baker clean out
D.D
0.0
23:00
00:00
assembly BHA#107 with polish mill
and casing scraper w/magnet and RIH
to 50'.
2/18/2019
2/18/2019
1.50
COMPZN
RPCOMP
BHAH
P
PJSM, P/U and M/U Baker clean out
0.0
0.0
00:00
01:30
assembly BHA#107 with polish mill
and casing scraper w/magnet and RIH
to 50'.
2/18/2019
2/18/2019
7.00
COMPZN
RPCOMP
TRIP
P
RIH with BHA#107 on 3-1/2" HT38
0.0
0.0
01:30
0830
Work- string to 9,702'. P/U single joint
drill pipe, M/U TDS.
2/18/2019
2/18/2019
1.50
COMPZN
RPCOMP
WASH
P
Break circulation at 9,702'. P/U 125k
0.0
0.0
08:30
1000
S/O 90k RAN 124k, 2bpm at 440 psi
42 rpm at 8,300 ft/Ibs torque. Stop
rotary and wash down to top of stump
and tag up at 9,714.2', pick up and
engage rotary and polish/mill/wash
over 7" stump w/ 3bpm at 660 psi and
43 rpm with torque increasing to 9,100
ft/Ibs as inner mill engaged 7" casing.
Dress/palish/mill/wash down from
9,714.2' to 9,719.2' with 42 rpm at
8,300 to 10,300 ft/Ibs and observe 7k
WOB indicating tag up on top of fish
with lip mill. P/U back reaming from
9,7192to 9,700' and stop rotary and
slack off down to 9,721.2' and set 10k
down. (Top of dressed off 7" cut is at
9,7145). P/U to 9,705' and circulate
bottoms up with 9 bpm at 3,145 psi.
2/18/2019
2/18/2019
1.00
COMPZN
RPCOMP
CIRC
P
Circulate bottoms up at 9,705' with 9
0.0
0.0
10:00
11:00
bpm at 3,145 psi. Shakers clean on
bottoms up, observed some scale,
sand, and small metal flings.
2/18/2019
2/18/2019
0.50
COMPZN
RPCOMP
TRIP
P
POOH from 9,705'to 9,647' and rack
0.0
0.0
11:00
11:30
stand back. M/U TDS and break
circulation recording parameters.
2/18/2019
2/18/2019
0.50
COMPZN
RPCOMP
WASH
P
Break circulation at 9,646', P/U 125k
0.0
0.0
11:30
12:00
S/O 90k RNV 124k, 5 bpm at 1,440 psi
42 rpm at 8,300 ft/Ibs torque. Work
casing scraper across packer setting
depth from 9,646' to 9,595' rotating
and reciprocating 5 times. Circulate
bottoms up at 9.646'.
2/18/2019
2/18/2019
1.00
COMPZN
RPCOMP
CIRC
P lCirculate
bottoms up at 9,646" with 9
0.0
0.0
12:00
13:00
bpm at 3,145 psi. Shakers clean on
bottoms up, observed some scale and
small metal flings.
2/18/2019
2/18/2019
10.00
COMPZN
RPCOMP
TRIP
P
POOH L/D 3 1/2" HT 38 Work string
0.0
0.0
13:00
2300
from 9,647' to 347' Set up t/ Cut and
slip D/L
Page 36/38 ReportPrinted: 2/21/2019
Operations Summary (with Timelog Depths)
2T-22
Rig: NABORS SES Job: RECOMPLETION
Time Log
I
$fart Depth
Start Time
EM Time
Dur(hr)
Phase
Op Code
Activity Code
Time P -T-%
Operation
(ftKB)
End Depth(WEI)
2/18/2019
2/19/2019
1.00
COMPZN
RPEQPT
SLPC
P
Slip and Cut Drilling Line 79'179'
0.0
0.0
23:00
00:00
2/19/2019
2/19/2019
1.00
COMPZN
RPCOMP
PULD
P
Continue UD 3 1/2" HT 38 D.P Work -
0.0
00:00
01:00
String
2/19/2019
2/19/2019
3.50
COMPZN
RPCOMP
BHAH
P
UD Baker BHA and 4 3/4" D.C. UD
01:00
04:30
All Baker Tools F/ Rig Floor and Pulled
Wear Ring Bushing
Flush BOP Slack RID Flush joint
2/19/2019
2/20/2019
19.50
COMPZN
RPCOMP
RCST
P
R/U 3 1/2" HYD -563 Tubing
04:30
00:00
Equipment M/U 3 1/2" HYD 563 as per
tally w/ Baker Non seal Overshot
M/U Tq 2900 Nlbs Continue running
3 1/2" completion string, tag tubing
stub on depth at 9714', set down and
swallowed 2.85', observed shear pins
shear 11 K.
2/20/2019
2/20/2019
1.00
COMPZN
RPCOMP
RCST
P
Tag tubing stub, set down 20k to
00:00
01:00
confine, PU saw 20K drag, popped off
when got off tubing stub. Tag twice
and mark for space out each time
seeing drag. PU above stub, prep to
circulate.
2/20/2019
2/20/2019
2.00
COMPZN
RPCOMP
CRIH
P
Pump 268bbi corrosion inhibited
01:00
03:00
9.3ppg brine, displace with 10bbi
9.3ppg brine from pits.
2/20/2019
2/20/2019
0.50
COMPZN
RPCOMP
PACK
P
Drop 1 5/16" ball and rod, wait for it to
03:00
03:30
fall. Pressure up on tubing to 2200psi
then 3000psi to set production packer.
PU, sheared out PBR with 20K over.
Packer set at 9628'.
2/20/2019
2/202019
2.00
COMPZN
RPCOMP
RCST
P
Space out, PU three pups, PU tubing
03:30
05:30
hanger and landing joint. Land out
tubing. Run in LDS
220/2019
2/20/2019
2.50
COMPZN
RPCOMP
PRTS
P
RU to pressure test tubing and IA.
05:30
08:00
Pressure up tubing to 3000 psi, chart
test for 5 mins. Pressure test good.
Bleed down tubing pressure to 1500
psi. Pressure up the IAto 2500 psi.
Chart test for 30 mins, test good.
Bleed tubing pressure down to 0 psi
while maintaining 2500 psi on IA.
SOV did not shear open. Pump on IA
to increase differential pressure, SOV
sheared open at 2900 psi. Rig down
circulating equipment. Blow down
surface lines and lay out landing joint.
2/20/2019
2/202019
0.50
COMPZN
RPCOMP
OTHR
P
Install BPV Pressure lest BPV to
08:00
08:30
1000 psi for 5 mins. Test good.
2/20/2019
2/20/2019
2.00
COMPZN
RPCOMP
NUND
P
Remove riser and riser adapter.
08:30
10:30
Nipple down BOP stack. Remove
choke hose from BOP slack. Remove
DSA.
2/20/2019
2/20/2019
2.00
COMPZN
RPCOMP
NUND
P
Clean hanger profile and install tree
10:30
12:30
adapter. Nipple up FMC Gen IV 3-
1/8" 5M production tree.
2/20/2019
2/20/2019
1.50
COMPZN
RPCOMP
PRTS
P
Pressure lest wellhead packoff to 250
12:30
14:00
psi low for 5 mins and 5000 psi high
for 10 mins. No visual leaks, pressure
test good.
2/20/2019
2/20/2019
0.50
COMPZN
RPCOMP
OTHR
P
Pull BPV and install tree test plug.
14:00
14:30
2/20/2019
2/2012019
0.50
COMPZN
RPCOMP
PRTS
P
Pressure test tree to 250 psi low for 5
14:30
15:00
mins and 5000 psi high for 10 mins.
Test good.
Page 37138 Report Printed: 2121/2019
Operations Summary (with Timelog Depths)
qW
2T-22
Rig:
NABORS 7ES
Job: RECOMPLETION
Time Log
Stan Time
End Time
our (hr)
Phase
On Code
Activity Code
Time P-T-X
Operation
Stan Depth
(fiKB)
End Depth(flKB)
2/20/2019
2/20/2019
0.50
COMPZN
RPCOMP
OTHR
P
Pull tree test plug.
15:00
1530
2/20/2019
2/20/2019
3.50
COMPZN
RPCOMP
FRZP
P
Rig up surface lines to production tree
15:30
19:00
to take returns to flow back tank and
freeze protect well. Rig up LRS to
tree and pump 80 bbls of diesel at 2
bpm at 950 psi. Taking returns to flow
back tank. Allow well to U-
tube/equalize tubing with IA.
2/20/2019
2/20/2019
1.00
COMPZN
RPCOMP
MPSP
P
M/U FMC dry rod and RIH w/ FMC
19:00
2000
BPV and set Secure well R/D release
Rig F/ 2T-22 T/ 2T-218 @ 20:00hrs.
Page 38138
Report Printed: 2/21/2019
1950 856
30375
WELL LOG TRANSMITTAL #905425682
To: Alaska Oil and Gas Conservation Comm. February 13, 2019
Attn.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Multi Finger Caliper: 2T-22
Run Date: 1/20/2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
FRS—ANC@halliburton.com
2T-22
Digital Data (LAS), Digital Log file, Casing Inspection Re ort, 3D Viewer 1 CD Rom
50-103-20224-00 RECEIVE D
FEB 19 2019
A®GCC
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@halliburton.com
Date: gll l / l 61? Signed:
ORIGINATED
ALASKA E -LINE SERVICES
42260 Kenai Spur Hwy
PO BOX 1481 - Kenai, Alaska 99611
PH: (907) 283-7374 FAX: (907) 283-7378
DELIVERABLE DESCRIPTION
RECEIVED Kuparuk
FEB 192019 19 50 86
AOGCC 50363
BP North Slope 0 0 0
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids
900 E. Benson Blbd. - Anchorage, AK 99508 USPS Tracking #
Conoco Phillips Alaska Inc. 1 0 0
Attn: NSK-69
700 G Street
Anchorage, Alaska 99501 USPS Tracking # n/a
AOGCC 0 0 1
ATTN: Natural Resources Technician II
Alaska Oil & Gas Conservation Commision
333 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539 USPS Tracking # 9405 5036 9930 0417 5293 91
DNR L 0 0 1
Attn: Garrett Brown -Geologist I
DNR, Division of Oil & Gas
550 West 7th Ave, Suite #1100 =Anchorage, AK 99501 USPS Tracking # 9405 5036 9930 0417 5293 84
Prim Name( ! Signatures "
Please return via e-mail a copy to both Alaska E -Line Services and Conoco Phillips Alaska:
tom.osterkamp@conocophillii)s.com reception@ake-line.com
ORIGINATED
ALASKA E -LINE SERVICES
42260 Kenai Spur Hwy
PO BOX 1481 - Kenai, Alaska 99611
PH: (907) 283-7374 FAX: (907) 283-7378
DELIVERABLE DESCRIPTION
2664 3H-05
2665 2T-22
2666 2T-22
2671 2K-26
TRANSMITTAL D'2/13/2019
TRANSMITTAL #: � 02132019
RECEIVED Kuparuk
FEB 19 2019 19 50 0 6
AOGCC 30 3 6 4
SU -029-20077-00
CCL -Final Field
50-103-20224-00
CCL -Final Field
50-103-20224-00
CCL -Final Field
50-103-20126-00
CCL -Final Field
1/9/2019
1/18/201'.
2/3/2019
BP North Slope 0 0 0
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids
900 E. Benson Blbd. - Anchorage, AK 99508 USPS Tracking #
Conoco Phillips Alaska Inc. 1 0 0
Attn: NSK-69
700 G Street
Anchorage, Alaska 99501 USPS Tracking # n/a
I31
AOGCC 0 0
TTN: Natural Resources Technician II
laska Oil & Gas Conservation Commision
33 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539 USPS Tracking # 9405 5036 9930 0417 5293 91
DNR 0 0
1
Attn: Garrett Brown -Geologist I
DNR, Division of Oil & Gas
550 West 7th Ave, Suite #1100 - Anchorage, AK 99501 USPS Tracking # 9405 5036 9930 0417 5293 84
Date
Please return via e-mail a copy to both Alaska E -Line Services and Conoco Phillips Alaska:
Pro
Loepp, Victoria T (DOA)
From: Ward, Dusty K <Dusty.Ward@conocophillips.com>
Sent: Thursday, February 7, 2019 4:49 PM
To: Loepp, Victoria T (DOA)
Subject: RE: [EXTERNAL]Re: 2T-22 Procedure Change
Follow Up Flag: Follow up
Flag Status: Flagged
Yes.
Thanks.
Dusty Ward
Senior Wells Engineer
Office: 907-265-6531
Cell: 503-476-2519
From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Sent: Thursday, February 7, 2019 4:48 PM
To: Ward, Dusty K <Dusty.Ward@conocophillips.com>
Subject: [EXTERNAL]Re: 2T-22 Procedure Change
Will you be testing the VBRs after install?
Victoria
Sent from my iPhone
On Feb 7, 2019, at 1:54 PM, Ward, Dusty K <Dusty.Ward@conocophillips.com> wrote:
Victoria,
Hope this finds you well.
On 2T-22 subsidence RWO procedure with 7ES, I wanted to communicate two updates as an FYI.
The well is progressing, and we've pulled the subsided 7" casing portion, and we've cleaned up most our
drift to run new 7" casing! We're getting ready to re -run our 7" casing to tie back into our cut (^'1750')
and then will move forward with the cement procedure to cement the 7" in place.
A change to the cement procedure:
- We will use an HES II cement valve instead of an HMCV cement valve in our 7", and we will be
closing the 7" fixed blinds as part of the cement procedure to force cement out of the OA valve
(instead of up letting it come up the BOP stack) as a planned 'routine use' of the 7" fixed ram.
- We will make sure the effectiveness of the element isn't compromised. (And we'll actually be
changing out the 7" back to the 2-7/8" x 5.0" VBRs in the next step, because we'll be done
working with our 7" casing after the cement job).
Also,
- the completion will now be primarily HYD 563 for the 7" casing and 3.5" completion instead of
BTCM and EUE 8rd respectively. (Revised schematic attached.)
1 thought it prudent to overcommunicate versus under communicate for this minor change, so this will
be a planned 'routine use' of the 7" BOP element. We won't be sending out any e-mail within 24 hours
of the operation since it is planned 'routine use'.
Thanks. Please reach out to me if you have any questions or concerns.
Make it a great day.
Dusty Ward
Senior Wells Engineer
Office: 907-265-6531
Cell: 503-476-2519
<2T-22 APPROVED 10-403 Pull Tubing, Repair Well, Alter Casing Sundry App.pdf>
<2T-22 RWO Prop Schematic_REV1.pdf>
KtEk zr-zz
Regg, James B (DOA)
From: Ward, Dusty K <Dusty.Ward@conocophillips.com>
Sent: Tuesday, January 22, 2019 7:39 PM -q.. (Z�i
To: DOA AOGCC Prudhoe Bay; Loepp, Victoria T (DOA) `1
Cc: Senden, R. Tyler; NSK RWO CoMan; Ward, Dusty K
Subject: Notification of BOP use on Nabors 7ES on 1/22/2019
Attachments: 2T-22 BOPE Letter 1 22 2019.doc
Victoria and to whom it may concern,
Please see attached document in response to Bulletin 10-003 in order to document the use of BOP equipment on 2T-22.
Please let me know if you have any questions.
Dusty Ward
Senior Wells Engineer
Office: 907-265-6531
Cell: 503-476-2519
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
Jan 22, 2019
AOGCC Industry Guidance Bulletin No. 10-003
Reporting BOPE Use to Prevent the Flow of Fluids from a Well
Dear Commissioner:
As per AOGCC Industry Guidance Bulletin No. 10-003, this letter is to follow up on BOPE usage on Nabors 7ES with a written
report. ! ^�
Time of BOPE Use: 1/22/2019 at 00:30 hours
Well Location: 2T-22 `
API Number: 50-103-20224-00
PTD Number: 195-086
Rip Name: Nabors 7ES '
Operator Contact: Dusty Ward. (o) 907-265-6531. (c) 503-476-2519. Dusty. Ward@conocophillips.com
Operations Summary: On 1/21/2019 at approximately 18:30, milling operations began on the 7" production casing because the casing
was buckled due to subsidence and we were attempting to enlarge the drift through the buckled portion of the casing so that a casing
cutter could be drifted below the buckled portion. While milling, the mill snapped off in the buckled casing and the remaining BHA
was pulled to surface. Shortly after that time, diesel was noticed at surface, which indicated fluid communication from 7" casing to the
7" x 9-5/8" outer annulus (OA). Diesel Arctic pack in the OA is nominally a 7.2 ppg, while a 9.3 ppg brine was in the 7" casing. Once
communication was made, the fluids started to swap and utube, which began to push diesel to the pits. At approximately 00:30 hours
on 1/22/2019 the blind rams were Jo to prevent diesel from nothing to the pits. 9.3 ppg brine was pumped in the well to let swap
with the diesel in the OA and returns were taken to a tank through the OA valve. Initial diesel returns were seen equal to the brine
fluid put in the well. After some time a brine/diesel mixture was returning to the tank. Some entrained gas also appeared to break out
of the diesel being displaced and was bled off. The operation of letting the fluids swap has continued throughout 1/22/2019, and the
ratio of brine returning with diesel has continued to increase. Currently the OA and casing have both been bled off and held at 0 psig.
We're waiting for a period to confirm the OA and casing are indeed balance. No fluid volume gains were realized through the
operation. The blind ram will be retested once current operations of swapping out the diesel is complete. It will be tested to 250 psi
and 2500 psi.
BOPE Used: Blind
Reason for HOPE Use: The blind ram was closed to determine to prevent utube diesel from entering the pits
Actions To Be Taken: The blind ram will be retested once the current operation of swapping out the diesel and confirming no pressure
on OA and casing is finished.
If you have any questions or require any further information, please contact me at 265-6531.
Sincerely,
Dusty Ward
Rig Workover Engineer
CPAI Drilling and Wells
i
ConocoPhillips
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
July 16th, 2010
Commissioner Dan Seamount
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Commissioner Dan Seamount:
•
~~~~rv~®
~1. ~~ €'~ 2010
A~~aska ~ & Gaz C~ C~pssion
~nclror~ge
195_080
a~~ as
Enclosed please fmd a spreadsheet with a list of wells from the Kuparuk field (KRil). Each of
these wells was found to have a void in the conductor. These voids were filled with corrosion
inhibitor, engineered to prevent water~from entering the annular space. As per previous
agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments
took place and meets the requirements of form 10-404, Report of Sundry Operations.
The corrosion inhibitor/sealant was pumped July 11th, 12th, 13th 2010. The attached spreadsheet
presents the well name, top of cement depth prior to filling, and volumes used on each
conductor.
Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions.
Sincerely,
Perry Klein
ConocoPhillips Well Integrity Projects Supervisor
•
ConocoPhillips Alaska Inc.
Surtace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Kuparuk Field
Date 7!16/10 2T. 3H PAD
r
Well Name
API #
PTD #
Initial top o
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft al
2T 22 50903202240000 1950860 8" Na 8" Na 3.8 7/12/2010
2T-23 50103202160000 1950320 8" Na 8" n/a 2.1 7/12/2010
2T-27A 50103202170100 2090900 7" n/a 7" Na 1.7 7/12/2010
2T-32 50103202180000 1950490 36" n/a 36" Na 11.9 7/12/2010
2T-37 50103202270000 1951010 22" n/a 22" Na 2.5 7/11/2010
2T-38A 50103202290100 1972050 8" n/a 8" Na 1.7 7/11/2010
2T-203 50103205200000 2051970 22" Na 22" Na 5.1 7/13/2010
2T-208 50103205180000 2051870 13" n/a 15" n/a 2.5 7/13/2010
2T 210 50103202730000 1982030 18" n/a 18" n/a 5.1 7/12/2010
2T-217A 50103203340100 2000740 8" n/a 8" n/a 1.7 7/12/2010
3H-13A 50103200890100 1961970 SF n/a 22" n/a 3.8 7/11/2010
PHILLIPS Alaska, Inc.
Subsidiary of PHILLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage, Alaska 99510-0360
M. Mooney
Phone (907) 263-4574
Fax: (907) 265-6224
February 19, 2002
Commissioner Cammy Oechsli Taylor
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue
Suite 100
Anchorage, Alaska 99501
Subject: Report of Sundry Well Operations 2T-22
Dear Commissioner Oechsli Taylor:
Phillips Alaska, Inc. submits the attached Report of Sundry Well Operations for the perforations
on the KRU well 2T-22.
If there are any questions, please contact me at 263-4574.
Sincerely,
M. Mooney
Wells Team Leader
Phillips Drilling
MM/skad
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator
Phillips Alaska, Inc.
3. Address
P. O. Box 100360
Anchorage, AK 99510-0360
4. Location of well at surface
4857' FNL, 4724' FEL, Sec. 1, T11N, R8E, UM
5. Type of Well:
Development __X
Exploratory __
Stratigraphic __
Service__
(asp's 498944, 5970401)
6. Datum elevation (DF or KB feet)
RKB 122 feet
7. Unit or Property name
Kuparuk Unit
8. Well number
2T-22
At top of productive interval
2265' FSL, 1155' FEL, Sec. 3, T11 N, R8E, UM
At effective depth
At total depth
2965' FNL, 1354' FEL, Sec. 3, T11N, R8E, UM
(asp's 491754, 5972298)
9. Permit number / approval number
195-086 /
10. APl number
50-103-20224
11. Field / Pool
Kuparuk Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
10193 feet
6107 feet
Effective depth: measured 9978 feet
true vertical 5940 feet
Casing Length Size
CONDUCTOR 85' 16"
SUR. CASING 3919' 9-5/8"
PROD. CASING 10056' 7"
Plugs (measured)
Junk (measured)
Cemented
225 sx AS 1
790 sx AS III, 640 sx Class G
210 sx Class G
Measured Depth
85'
3958'
10183'
True ve~icalDepth
85'
2882'
6099'
Perforation depth:
measured 9905'-9925',9954'-9970'
true vertical 5884'-5899', 5922'-5934'
l'ubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 Tbg @ 9793' MD.
Packers & SSSV (type & measured depth) BAKER SABL-3 PERM. @ 9768' MD.
CAMCO 'DS' NIPPLE NO GO @ 511' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) N/A
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Oil-Bbl
673
Representative Daily Averaqe Production or Iniection Data
Gas-Mcr Water-Bbl
1348 98
712 1444 94
Casing Pressure Tubing Pressure
271
284
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
Oil__ X Gas__ Suspended__
Service.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Questions? Carl Mike Mooney 263-4574
Signed
Michael Mooned,
Title Wells Team Leader
Date Z.//~/~
Prepared b~/ Sharon Al~sup-Drake 263-4612
Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE
Date
Comment
2T-22 Event History
01/09/02
01 / 17/02
TAGGED @ 9990' RKB, EST 65' OF RATHOLE. DRIFTED TBG W/2.62" X 20' HC TO 9990' RKB. [PERF,
TAG]
PERFORATED A2 SAND INTERVAL @ 9954'- 9970' W/2 1/2" HSD 6 SPF POWER JET 60 BEG PHASING,
TAGGED TD AT 9978'. [PERF]
Page 1 of I 2/13/2002
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
Ron Marquez
Production Engineering Supervisor
Kuparuk River Unit
NSK 69
Phone 659-7226
Fax 659-7314
October 6, 1999
Mr. Robert N. Christenson, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Christenson'
Attached in duplicate are Report of Sundry Approvals (Form 10-404) for the
following Kuparuk wells:
Well Action
2T-22 Stimulate
3F-18 Perforate
3F-18 Perforate
3H-15 -Perforate
3M-23 Stimulate
RECEIVED
OCT 2 ~ ~995)
0il & Gas Cons. c0mmissi0.n
Anchorage
If you have any questions, please call me at 276-1215, ext. 7226.
Sincerely,
,I, ~- ~
Ron M~rque~
Kuparuk Production Engineering Supervisor
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
bcc;
Central Files
NSK Well Files
ATO-320
NSK-69 (w/o cover)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation Shutdown _ Stimulate~X Plugging _ Perforate _
Pull tubing Alter casing Repair well _ Other _
2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet):
ARCO Alaska, Inc. Development X. 41' RKB
13. Address: Exploratory_~. 7. Unit or Property:
P.O. Box 100360 Stratagrapic__
Anchorage, AK 99510-0360 Service __ Kuparuk River Unit
4. Location of well at surface: 8. Well number:
417' FSL, 556' FWL, Sec 1, T11 N, R8E, UM 2T-22
Af top of productive interval: 9. Permit number/approval number:
2265' FSL, 1155' FEL, Sec 3, T11 N, R8E, UM 95-86
At effective depth: 10. APl number:
2298' FNL, 1293' FEL, Sec 3, T12N, R8E, UM 50-103-20224-00
At total depth: 11. Field/Pool:
2315' FSL, 1354' FEL, Sec 3, T11N, R8E, UM Kuparuk River Field / Oil Pool
12. Present well condition summary
Total Depth: measured 10193 feet Plugs (measured) None
true vertical 6107 feet
Effective Depti measured 10093 feet Junk (measured) None
true vertical 6029 feet
Casing Length Size Cemented Measured depth True vertical depth
Conductor 85' 16" 225 Sx AS I 121' 121'
Surface 3919' 9-5/8" 7906x AS III lead & 3958' 2882'
6406x Class G tail
Production 10056' 7" 210 sx Class G 10183' 6099'
Liner
Perforation Depth
measured g905' - gg25'
true vertical 5884' - 5899'
Tubing (size, grade, and measured depth) 00~-
3.5", 9.3 Ib/ft, L-80 @ 9793' . .~
Packer: Baker SABL-3 perm @ 9768'; No SSSV: Nipple @ 511'
13. Stimulation or cement squeeze summary
Fracture stimulate "A" sand on 7/8/98. ,~'~l
Intervals treated (measured)
..... ~.; ~.,
9905'-9925' '-' -' ~ .~"' ~ ,
Treatment description including volumes used and final pressure
Pumped 237,427 lbs of 20/40, 12/18 & 10/14 ceramic proppant into formation, fp was 5118 psi.
14. Representitive Daily Average Production or Injection Data
Oii-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 881 686 108 1000 280
Subsequent to operation 1446 646 170 1149 257
15. Attachments MIT form 16. Status of well classification as:
Copies of Logs and Surveys run _
Daily Report of Well Operations _~X Oil _X Gas _ Suspended _ Service _
17. I here. by certify that the foregoing is true and correct to the best of my knowledge.
/L~t~,~;~-/-)j'~ Title: Production Engineering Supervisor Date
Signed
'""IIII"L I
Form 10-404 r~ 5/88
SUBMIT IN DUPLIC~
Inc.
(UPARUK RIVER UNIT
."LL SERVICE REPORT
K1(2T-22(W4-6))
WELL JOB SCOPE JOB NUMBER
2T-22 FRAC, FRAC SUPPORT 0628981833.2
DATE DAILY WORK UNIT NUMBER
07/08/98 A SAND FRAC. FRAE;
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
4 i~ Yes (~ ,oI ® Yes (~ No DS-YOKUM RinGS
FIELD AFC# CC# DALLY COST ACCUM COST Si;i~.~..~ ,ed,3/,~ .~ .,,/,,....
ESTI MATE K D2457 230DS28TL $139,227 $160,395
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann ~ Initial Outer'Ann' I ~=in/al~7'e~r'~nn
0 PSI 160 PSI 1000 PSI 500 PSII 110 PSI I 225 PSI
DALLY SUMMARY
A SAND REFRAC PUMPED FRAC AS PER DESIGN @ 15 BPM AND AN AVG. PRESSURE OF 3450# USING 50# XL GW.
COMPLETED THRU FLUSH (45 BBLS DIESEL PAST SWAB). PUMPED 237427 # OF PROPANT IN THE FORMATION W/427#
PROPANT LEFT IN THE PIPE. PROPANT USED 20/40 12/18 10/14 WITH 14 PPG AT PERF'S [Frac-Refrac]
TIME LOG ENTRY
08:30 MIRU DS EQUIPMENT HOLD SAFETY MEETING 17 PEOPLE ON LOCATION. PT LINES TO 10000#
09:00 PUMP BREAKDOWN W 50# XL GW @ 15 BPM. TBG PRESS@ 7114# AN PRESS @ 3439# PREFORM STEP DOW
TEST. MONITOR PRESSURE. ISIP 1332# AN PRESS 2507
10:20 PUMPED DATA FRAC STARTING @ 5 BPM UP TO 15 BPM W/50# XL GW. AVG TBG. PRESSURE 3827#. SD
MONITOR PRESSURE.
11:25 PUMPED 375 BBL PAD@ 15 BPM W/50# XL GW. @ 4770# TBG. PRESSURE.
12:06 PUMPED FRAC AS PER DESIGN @ 15 BPM AVG. PRESURE 3400# USING 50# XL GW PUMPED FLUSH AWAY.
ISIP 1849# TOTAL PROP 237427 W 144fPPG AT PERFS:427# OF PROP IN PIPE 25' OF FILL. PUMPED
60 BBL DIESEL.
14:30 DOWELL STARTED TO RIG DOWN MOVE OFF.
SERVICE COMPANY - SERVICE DAILY COST ACCUM TOTAL
$0.00 $1,280.00
APC $5,000.00 $6,750.00
DOW ELL $132,227.74 $132,227.74
HALLIBURTON $0.00 $12,378.00
LITTLE RED $2,000.00 $7,760.00
TOTAL FIELD ESTIMATE $139,227.74 $160,395.74
P ERHIq' DATA T DikTA .... F'I,,US
Da'[u; 07/0c-~/97'.
tRUN DAI"E ...... RECVD
'n5
i0/J3/',,
95 .... 086 SUF.::VEY ~ 121~--i0i93
A N A D iq.:: I L. L
/',.".! ,^. D F: l L L--
'1
08/' irs 19%
l,~ 8 / ''~ q / q ~',
.... !
0 8/" z .u/ 3 5
95-~086 ,SDR
..p,~. i 0 193 -I+ 150
10~-,".t07 ,-.R'/;.OOMPL. ETZON DATE
I '-~ 2 I O/ i 3/95
~ /91 /¢f'/ /ox';O,"
Ar'e
dr'y
t:he
DAI L"/ WELL
d'¥t;ch samples
ops R G;'/~,q~-/ Tc, $ St /clj'7 I~/"_~o/?~-'/'"
r'equ'¥r'ed? yes ~And r'eceived?
y e s .(~,.'*t "~ a 'l y s i s
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 25, 1995
Mr. David J. Johnston
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: 2T-22 (Permit No. 95-86) Well Completion Report
Dear Mr. Commissioner:
Enclosed is the well completion report for the recent operations on KRU 2T-
22.
If there are any questions, please call 265-6206.
Sincerely,
Supervisor
Kuparuk Drill Site Development
MZ/skad
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COM~v~ISSION
WELL COMPLETION OR REOOMPLETION REPORT AND LOG
1 Status of Well
Classification of Service Well
OIL ~] GAS ~'~ SUSPENDED ~ ABANDONED r~ SERVICE
2 Name of Operator
ARCO Alaska, Inc
3 Address
P.O. Box 100360, Anchoracje, AK 99510-0360
4 Location of well at surface
417' FSL, 556' FWL, Sec. 1, T11N, R8E, UM .
At Top Producing Interval
2265' FSL, 1155' FEI_, Se(::. 3, TllN, R8E, UM
At Total Depth
·
2315' FSL, 1354' FEE Sec. 3, T11N, R8E, UM
5 Elevation in feet (indicate KB, DF, etc.)
RKB 41' Pad 81'
12 Date Spudded
June 16, 1995
17 Total Depth (MD+TVD)
10193' MD & 6107'TVD
Permit Number
95-86
22 Type Electric or Other Logs Run
8 /'A?t Number
~' {i-~5¢1,03-20224
9 Unit.br~f_ea..4e Name
KuparOE:R~v'er Unit
10 Well Number'
2T-22
Field and Pool
KUPARUK RIVER
Kuparuk River Oil Pool
6 Lease Designation and Serial No. ADL25568 ALK2666 '
June 24, 1995 31-Au~]-95 (Perf'd) NA feet MSLI 1
18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost
10093' M D & 6029'MD YES [~ NO [~ NA feet MD ,, 1380'ss APPROX
GR/CDR
23
CASING SIZE
7" 26.0# Surf.
24 Perforations o ~n to Production (MD+TVD of Top and Bottom and
interval, size and number)
4 spf 9905' - 9925' MD 5884' - 5899"1'VD
27
Date First Production
September 15, 1995
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
BTM HOLE SIZE CEMENT RECORD
121' 24" 225 SX AS I
3958' 12.25" 790 sx AS III Lead, 640 sx Class G Tail
10183' 8.5" 210 sx Class G
25 TUBING RECORD
;Date of Test IHours Tested
September 29, 1995 24
Flow Tubing JCasing Pressure
Press 317 I 507
SIZE IDEPTH SET (MD) PACKER SET (MD)
3.5" 19793' 9768'
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED
183,302# carbolite proppant
9905'-9925'
PRODUCTION TEST
IMethod of Operation (Flowing, gas lif~, etc.)
Flowing
PRODUCTION FOR IOIL-BBL GAS-MCF
!
ITEST PERIOD ¢ I 1759 2531
ICALCULATED OIL-aBE GAS-MCF
124-HOUR RATE I~
WATER-aBE
14
WATER-aBE
CHOKE SIZE I GAS-OIL RATIO
1 76 J 1438
OIL GRAVITY-APl (corr)
24°
28 CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cora chips.
Form 10-407
Rev. 7-1-80
C. ONRNUED ON REVERSE SIDE
Submit In duplicate
30.
GEOLOGIO MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Kuparuk O 9866' 5854"
Bottom Kuparuk O 9878' 5863'
Top Kuparuk A 9878' 5863'
Bottom Kuparuk A 10050' 5996'
31. LIST OF AI-f'ACI~MENTS
Daily Drilling Histon/, Directional Survey
·
32, I hereby certify that the foregoing is true and correct to the best of my knowlege.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in~situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 28: If no cores taken, indicate "none".
Form 10-407
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
·
Date:10/04/95
Page: 1
ARCO Alaska Inc.
DAILY DRILLING REPORT
WELL:2T-22 RIG:PARKER 245 WI: 55% SECURITY:0
WELLID: AK8173 AFE: AK8173 TYPE:DEV AFE EST:$ 1322M/ 1720M
AREA/CNTY:NORTH SLOPE STATE:AK API NUMBER:50-103-20224
FIELD: KUPARUK
SPUD:06/16/95 START COMP: FINAL:
06/17/95 (1)
TD: 828' (828)
SUPV:JT
06/18/95 ( 2)
TD: 3970' (3142)
SUPV: JT
06/19/95 (3)
TD: 3970'( 0)
SUPV:JT
06/20/95 (4)
TD: 4206' (236)
SUPV:JT
06/21/95 (5)
TD: 6165'(1959)
SUPV:RLM
06/22/95 (6)
TD: 9075' (2910)
SUPV:RLM
06/23/95 (7)
TD: 9707'(632)
SUPV:RLM
06/24/95 (8)
TD:10193' (486)
SUPV:RLM
06/25/95 (9)
TD:10193' ( 0)
SUPV: PJ24
MW: 9.5
RIH
Drill from 121' to 828' .
DAILY: $57,224 CUM: $57,224
PV/YP: 31/29
ETD:SO
APIWL: 8.2
EFC: $1,378,724
~N: 10.2 PV/YP: 26/30 APIWL: 7.6
POOH TO PU HOLE OPENER
Drilled from 828 to 3970. POOH. Tight and swabbing. Hit
bridges.
DAILY:S90,365 Cb/~:$147,589 ETD:SO EFC:$1,469,089
MW: 10.2 PV/YP: 18/12 APIWL: 7.8
TESTING BOPE
Ream out bridge. Run 9-5/8" casing. Cement well. Prepare to
test BOPE.
DAILY:S196,193 CUM:$343,782 ETD:SO EFC:$1,665,282
MW: 9.7 PV/YP: 20/28 APIWL: 8.2
DRILLING
Pressure test BOPE. Pressure test casing. Held H2S drill.
Drill from 3980' to 4206'.
DAILY:S91,453 CUM:$435,235 ETD:SO EFC:$1,756,735
MW: 9.8 PV/YP: 23/18 APIWL: 7.6
DRILLING
Directional drill 8.5" hole from 4206' to 6165'
DAILY'S93,006 C~4:$528,241 ETD:SO EFC'$1,849,741
MW: 10.1 PV/YP: 19/10
POOH
Directional drill from 6165' to 9075'.
DAILY: $74,902 CUM: $603,143 ETD:SO
APIWL: 5.2
EFC: $1,924,643
MW: 10.9 PV/YP: 18/12 APIWL: 4.8
DRILLING
Directional drill 8.5" hole from 9075' to 9707'.
DAILY:S87,845 CUM:$690,988 ETD:SO EFC:$2,012,488
MW: 10.9 PV/YP: 24/12 APIWL: 4.0
POOH
Directional drill 8.5" hole from 9707' to 10193'.
DAILY:S88,931 CUM:$779,919 ETD:SO EFC:$2,101,419
MW: 10.9
CIRCULATE 7" CASING
Run 7" casing to 10183'
DAILY:S184,054 CUM:$963,973
PV/YP: 22/10
ETD:SO
APIWL: 4.4
EFC: $2,285,473
Date: 10/04/95
Page: 2
06/26/95 (10)
TD'10193~ ( 0)
SUPV: R/lV/
ARCO Alaska Inc.
DAILY DRILLING REPORT
MW: 0.0 PV/YP: 0/ 0 APIWL: 0.0
RIG RELEASED
Cement 7" casing. CIP at 1006 hfs 6/25/95. Freeze protect
7x9 5/8 annulus. Release rig at 2400 6/25/95.
DAILY:S94,372 CUM:$1,058,345 ETD:SO EFC:$2,379,845
Date: 10/04/95
Page: 3
ARCO Alaska Inc.
DAILY DRILLING REPORT
REMJ~DIAL AND COMPLETION OPERATIONS
~LL:
WELLID: AK8173
AiREA/CN~Y:
FIELD:
SPUD:
RIG:NORDIC WI: 0% SECURITY:0
AFE: AK8173 TYPE:DEV AFE EST:$ 1322M/ 1720M
STATE: API NUMBER:
START COMP: FINAL:
08/22/95 (11)
TD:10193'
PB: 0'
SUPV:DCL
PREP ROAD FOR RIG MOVE MW: 0.0
Rig maintenance. Move rig from 2B pad to F-pit.
-.
DAILY:S36,750 CUM:$1,095,095 ETD:SO
EFC: $2,416,595
08/23/95 (12)
TD:10193'
PB:10093'
SUPV:DCL
~J BOP, PREP TO TEST. MW: 0.0
Move rig from F pit to 2T. Accept rig @ 0100 8/23/95.
Prepare rig.
DAILY:S17,800 CUM:$1,112,895 ETD:SO
EFC: $2,434,395
08/24/95 (13)
TD:10193'
PB:10093'
SUPV:DCL
RIG W/ 3-1/2" COMPLETION
Test BOPE and 7" casing.
DAILY:S34,158 CUM:$1,147,053 ETD:SO
MN: 0.0
EFC: $2,468,553
08/25/95 (14)
SEAWATER/DIESEL
TD:10193'
PB:10093'
SUPV:DCL
RiH W/ 3-1/2" COMPLETION
?,f~,~: 0.0
Finish running in hole with 3-1/2" completion equipment.
Freeze protect well. Secure well. Released rig at 2300 hrs
8-24-95.
DAILY:S108,995 CUM:$1,256,048 ETD:SO EFC:$2,577,548
8/31/95 Perforate 'A' sands
Perforated 'A' sand interval 9905'-9925' with 2-1/8" enerjet gun, bighole
charges, 4 spf total, oriented +/- 90 degrees, 180 degree phasing.
End of WellSummary for Well:AK8173
RECEIVED
Alaska 0il & Gas 0~%. Commission
Anchorage
:2j:.-'4. ,' -,--.o
ft ft ft ft
12!,00 0,0 12!,0'3 0,00
~0,00 ~c, ,. 440
530,00 ?0,0 52?,?? 0,12
~:l,O~ ?i,;~ 620 <'~ "41
~0i
!3~0~76
i570,83
!755
1i.7,i ...... 47.~
?0~? i002,35
9i,4 i090,72 7!,76
72,~ 1270,37
?2,7 1357,~`~ 177,7!
94,6 !445,!?
92,5 16!4,1i 2?4,77
?2,O !673,2~ 34!,67
zm~ ;~:.- ~7~...
?4,2 1546:%
V4,5 17!S,04 510,46
9t,5 ~, ...... ,,
. ~:d~O~lff .....
.~ ,0 2Z?¥,33 I034,74
23!4,~5
~ ^ ~7
3625,02 !~7,4 2726,2~ i866,70
5~ ~ - 207!,!A
4007~23
4098,30
41'74,01
4287,80
4380,g4
2994,95 7367,34
.... ~' ~:~ 252?
~wS,~ ,73
75:3 3i~!~i3 i67!~07
£//,}
~ .... ~ ^~ 3355~~
4472,00
:_:-..-! . .~.d
STATION AZIMUTH LATITUDE
INCLN~ N/'S
d,~o Oe~ ft
^ ~n ~,OO O,O0
3 .= =:~,00 -0,22
10,50 "~ ~ 10,77
~,40 27~,"~ '~ 79.
i~ ~ ~/4,51 !7,14
t6,85 276,99 !9,80
20,75 278,00 28,66
PS,hA ?' '"" 34,85
9$,62 ':~'~.q7 ~3,12
, 2~4,57 53,07
29 i! -
45,g7 ~o ~ i35,5~
.... r7 79
.~ ~a~. 270 ~/
t~,l? .... 31 ,'"
. _ z..
62,26 287,02 403,94
~£ .... .. ~!& _
62,02 2~,77 565,7!
~i,45 ~"'
80,77 285,99 645,64
60,~n 286,~ ,~, s9
59,48 287,R~ 713,:~
9?-9?
OEPARTURE DI~,~:MnN? AZIMUTH
g!-Y
ft ft deo
0,00 O,O0
::-4! i ~" :97 an
-0,62 1,98
-2,54 2,55 264,76
fi:
,.leal
lOOft
0 ,C:O
0,16
O, '.."?
5,41
-45 '~ 47,97
-66,? 6~,81 283,27 9,09
-90,34 ?!,95 280,74 !,18
-116,51 11~,18
· .!44,81 i46,77 27'2,27 2,49
-iZz 1~ 178,4~ 279,24 2,ii
-270,75 275,56 2~0,34 3,93
'OJ;T;' '-
-385,i3 393,40 2S1,77 " 94
ZO: 3~~''
-439,I~ 445',% '~ <'~ -'
.-497,54
~. ~-~- VI .
-se7 ~. =7~ "' 283,67 3,71
. / ,3
¢..~ .;,...
-766,.74 .... i~
-84!,36 871,60 2~5,0! 3,5?
1241,,42 1286 '"~ ..:'85 14
" 15.oo,57 "~,27
-'479~4z "'"' .'.'
-!639,03 !700,4t 285,
1778,53 1867,01
... /.07~.* dj
-1588,78 2671,87
-;j 0020 i ~
0,4',2
0,34
0,59
0,?I
!,40
i:i7
O, 54
O, .37
~773~10
3963,4~
9244,57
._ 2£?0,
93,4 5406,08
?O,o 5591,72
i0!14,05' 231,7
TH~ LAST
ft de~ deo ft
· - ~ o~ tn':l
435!:~.~ 62,60 ~o~,~' ..... ~
'~t
.... .-
-4518,22
5755, ?5
,r.' ~ .; :'.-
jJ~ ::,.,,
57! ,:.~ ."J
,~ ; -~-~ .~
.658'¢,20 58,10 284:02 -~68Z,70
6648,2':.-' ~.~ a":: ?A~: ci i7(11:~4
.a'-.-i ;,~ _~ .;-ua. . .. . :u,.:
~, ._..-, ,.,, .,.=.., Y2 2~;:, :."- ......... -"--'
6~0,'~, '-'" =-q "'" "' ..... I ....,40
.,=.¢ 3£ ./,.,,--'"J £:-"£*~'/ /-JO iq';+ ,'-0
....7~7,03 36,35 285.q0... 1883,20 -/z,0,03
7240,17
265,4~
~84,5'4
284,?0
284,75
2~4,74
2S4,74
?84,74
284,75
~84,TM¢,
~en/
lOOft
0,63
0,72
0,46
0,57
2:'-'7
1 ... '7.
1,66
5,i6
i,12
l, 08,
0,04
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9796
Company:
10/11/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk (Open Hole)
LIS
Well Job # Log Description Date BL RF Sepia DIR MWD Tape
2T-22 ~i~'.-~//O 95232 CDR [n~,~l C~ ~..~\'~//(,.-~,1) 1"~_.._950624 1 1 I
SIGNED:
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
ARCO Alaska, Inc.
Date: August 25, 1995
Transmittal #: 9291
RETURN TO:
ARCO Alaska, Inc.
Attn: Brian Hebert
Kuparuk Records Clerk
ATO-1119B
P.O. Box 100360
Anchorage, AK 99510-0360
Transmitted below are the following items.
return one signed co~y of this transmittal.
2A-18~ Directional Survey
Please acknowledge receipt and
AK7621
/._2 ._~T.:22_-22q~:-o ~(~'~ Directional Survey5/19/95 AK8213
' Directional Survey 6/23/95 AK8173
~ ~~_.~T:2.6 Directional Survey 6/9/95 AK8237
E['~- ~ ~ -_._.T.:2~ Directional Survey 7/2/95 AK9229
~ ~-~_.2_.T=29~ Directional Survey 5/31/95 AK8157
~ ~t~ .-~.2.T. c3-1_~ Directional Survey 7/11/95 AK8181
~ q~'"-~ .2T-3~6~_ Directional Survey ~~t95~ ...... AK8253
/ ~: , · ..... ~'7. Date:
5/18/95
Mr. Vernon E. Pringle, Jr.
DeGIoyer and MacNaughton
One Energy Square
Dallas, TX 75206
':'?Earry Grant (2 copies),
3001 Porcupine Dr.
Anchorage, AK 99501
ARCO Alaska, Inc.
Date: August 11, 1995
Transmittal #: 9285
RETURN TO:
ARCO Alaska, Inc.
Attn: Bdan Hebert
Kuparuk Records Clerk
ATO-1119B
P.O. Box 100360
Anchorage, AK 99510-0360
Transmitted below are the following items. Please acknowledge receipt and
return one signed copy of this transmittal.
r..I,)/,' 0'~O~2A-18 Sub-Surface Directional
Survey
..-------"'S-d'rvey
~,~ o~1.... 2A-28 SurveySUb-Surface Directional
2T-22 Sub-Surface Directional
Survey
Sub-Surface Directional
~ ~ O'~~T-26 Survey
~ ~"-..-O"}~ 2T-29 SurveySUb-Surface Directional
¢//¢"'-0¢"/fl 2T-31Receipt ,Sub-SurfaCesu rve. y_..// Directional
Acknowledged:/''7/--~-,-~ ,.~ ~
DiSTRiBUTiO ;i~/ '/ '
Mr. Vernon E. Pringle, Jr.
DeGIoyer and MacNaughton
One Energy Square
Dallas, TX 75206
5/18/95 AK 7621
712/95 AK 9229
6/23/95 AK 8173
6/9/95 AK 8237
5/31/95 AK 8157
7/11,95
-.
Date.;
· ,, u,, ~.""~'~anChorage.Cuns Co[a~fS,lo~
:Lar~ Grant (2 ~pies)
3001 Porcupine Dr.
Anchorage, AK 99501
ALASKA OIL AND GAS /
CONSERVATION COMMISSION
/
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
June 14, 1995Date
Michael Zanghi
Drill Site Develop. Supv.
ARCO Alaska, Inc.
P O Box 10~360
Anchorage, AK 99510-0360
Re:
Kuparuk River Unit 2T-22
ARCO Alaska, Inc.
Permit No. 95-86
Sur. Loc. 417'FSL, 556'FWL, Sec. 1, TllN, R8E, UM
Btmnhole Loc. 2298'FSL, 1433'FEL, Sec. 3, TllN, RSE, UM
Dear Mr. Zanghi:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling oper. ations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector on the North Slope pager at
659-3607.
Sincerely,
Russell A. D~uglas
Commissioner
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ~
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of Work Drill X Redrill [~ 1 b Type of Well Exploratory ~] Stratigraphic Test [~] Development Oil X
Re-Entry r"l Deepen [~ Service ~] Development Gas r~ Single Zone X Multiple Zone F'~
2. Name of Operator 5. Datum Elevation (DF or KB) 1 0. Field and Pool
ARCO Alaska, Inc. RKB 41', Pad 81' feet Kuparuk River Field
3. Address 6. Property Designation Kuparuk River Oil Pool
P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25568, ALK 2666
4. Location of well at surface 7. Unit or property Name 1 1. Type Bond (see 20 AAC 25.025)
417' FSL, 556' FWL, Sec. 1, T11N, R8E, UM Kuparuk River Unit Statewide
At top of productive interval (@ TARGET ) 8. Well number Number
2239' FSL, 1204' FEL, Sec. 3, T11N, R8E, UM 2T-22 #U-630610
At total depth 9. Approximate spud date Amount
2298' FSL, 1433' FEL, Sec. 3, T11N, R8E, UM 6/1 5/95 $200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
property line 2T-2 10270' MD
1433 ~ TD feet 10.7' ~ 540' MD feet 2560 6152' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2))
Kickoff depth 600' feet Maximum hole angle 61,84° Maxirnumsurface 1700 psig At totaJ depth (TVD) 3200 pslg
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Len~lth MD TVD MD TVD {include sta~le data)
24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' +_200 CF
12.25" 9.625" 40.0# L-80 BTC 3867' 41' 41' 3908' 2872' 790 Sx Arcticset III &
HF-ERW 640 Sx Class G
8.5" 7" 26.0# L-80 BTCMOE 10229 41' 41' 10270' 6152' 210SxClassG
HF-ERW Top 500' above Kuparuk
1 9. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cement~ ~%asured depth True Vertical depth
Structural~ E£EiV
EIJ
Conductor
Surface
Intermediate
ProductiondUN 1 2 1995
Liner
A~ska 0il & Gas Cons. Commission
Perforation depth: measured
true verticalAnch0ra :~
20. Attachments Filing fee X Property plat ~] BOPSketch X Diverter Sketch X Drilling program X
Drilling fluid program X Time vs depth plot [-'1 Refraction analysis E] Seabed report [-~ 20 AAC 25.050 requirements X
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed '~ API~r CommissionTitleuse OnlyDrill Site Develop. Supv. Date
Permit._Number ~ I Approval dat ~;),.~..,.1 See cover letter for
/~',_~"--oc>~' ~ 50-/4~- .2..~ .~. ~_. ~' e(~ ...- /.~..~ other rec{uirements
Conditions of approval Samples required [~ Yes ~ No Mud Icg required r'] Yes ~ No
Hydrogen sulfide measures J~ Yes [~] No Directional survey required ]~ Yes [~] No
Required working pressure forBOPE [~] 2M [] 3M [~] 5M [~ 10M r~ 15M
Other: ORIGINAL SIGNED BY
RUSSELL A. DOUGLASS by order of
I IL I C~--
Approved by Commissioner the commission Date
Form 10-401 Rev. 7-24-89 Submit in triolicate
GENERAL DRILUNG PROCEDURE
KUPARUK RIVER FIELD
2T-22
,
.
,
,
,
.
.
.
,
10.
11.
12.
13.
14.
15.
16.
17.
Move in and rig up Parker #245.
Install diverter system.
Drill 12-1/4" hole to 9-5/8" surface casing point (3,908')according to directional
plan.
Run and cement 9-5/8" casing.
Install and test BOPE. Test casing to 2000 psi.
Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW.
Drill 8-1/2" hole to total depth (10,270') according to directional plan.
Run open hole evaluation logs or LWD tools as needed.
Run and cement 7" casing. (If significant hydrocarbon zones are present above the
Kuparuk, sufficient cement will be pumped for isolation in accordance with Rule 20
^AC 25.030. Alternatively, if significant hydrocarbon zones occur within 200' TVD
of the surface casing shoe, cement will be down squeezed in the annular space between
the surface and production casing after the primary cement job is completed.)
ND BOPE. NU tubinghead & either full opening valve (if logging planned) or master
valve and upper tree assembly (if no logging planned). Note: As a dedicated producer,
no cased hole cement bond logs will be run unless there are problems with the cement
job.
Secure well and release rig.
Move in and rig up Nordic #1.
Install and test BOPE. Pressure test 7" casing to 3500 psi.
Perforate and run completion assembly. Set and pressure test packer.
ND BOPE and install production tree.
Shut in and secure well.
Clean location and release rig.
RECEIVED
JUN 1 2 1995
Alaska Oil & Gas Cons. Commission
Anchor; ~;'
DRILLING FLUID PROGRAM
Well 2T-22
Density
PV
YP
Viscosity
Initial Gel
10 Minute Gel
APl Filtrate
pH
% Solids
Spud to 9-5/8"
surface casing
9.0-10.0
15-25
15-35
50-80*
5-15
15-40
10-12
9.5-10
+10%
Drill out to
weight up
8.4-9.6
5-15
5-8
30-40
2-4
4-8
8-10
9.5-10
4-7%
Weight up
to TD
11.0
10-18
8-12
35-50
2-4
4-8
4-5 through Kuparuk
9.5-10
<12%
Drilling Fluid System:
Tandem Brandt Shale Shakers
Triple Derrick Shale Shakers
Solids Processing System to minimize drilling waste
Mud Cleaner, Centrifuges, Degasser
Pit Level Indicator (Visual and Audio Alarm)
Trip Tank
Fluid Flow Sensor
Fluid Agitators
RECEIVED
JUN 1 2 199,5
A!aska 0il & Gas Cons. Commission
Anchore ,~
Notes:
Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033.
Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW
and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface
pressure of 1,700 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to
3000 psi.
The nearest existing well to 2%22 is 2T-2. As designed, the minimum distance between the two wells
would be 10.7' @ 540' MD.
Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well
or will be pumped down the surface/production casing annulus of an existing well. That annulus will be
left with a non-freezing fluid during any extended shut down (> 4 hr) in pumping operations. The 2T-22
surface/production casing annulus will be filled with diesel after setting 7" and prior to the drilling rig
moving off of the well. If isolation is required per regulations on significant hydrocarbons, the annulus
will later be sealed with cement from the surface shoe to the base of the permafrost, with Arctic pack
fluid or diesel from the base of the permafrost to the surface.
Risks in the 2T-22 drilling area include lost circulation and high pressures in the Kuparuk formation. Lost
circulation above the Kuparuk will be addressed with lost circulation material (LCM) and reduced
circulating rates as needed. The 7" casing will be topset above the Kuparuk and a 5" liner run to TD if
lost circulation cannot be controlled with LCM and reduction of circulating pressure alone. Efforts to
reduce Kuparuk geopressure at the target location and careful analysis of pressure data from offset
wells show that a mud weight of 11.0 ppg will provide sufficient overpressure to safely drill, trip pipe,
and cement. The 9-5/8" casing shoe will be tested to an equivalent mud weight of 12.5 ppg upon
drilling out of the surface casing.
*Spud mud should be adjusted to a FV between 50-80 sec/qt to drill gravel beds.
iCreotedi by : jones For: D PETRASIt
I Date plotted : 9-May-95
Reference is 22 Version #5.
iCoordinotes ore in feet reference slot #22.
.
True Vertical Deference RKB.
ARC0 ALASKA,
Structure : Pad 2T Well : 22
Field : Kuparuk River Unit Location : North Slope, Alaska
Wesf
7650 7200 6750 6300 5850 5400 4950 4500 4050 3600 3150 2700 2250 1800 1350 900 450 0 450
Scale 1 · 225.00
o
o
0 _
..
4_3 450 _
TD LOCATION:
9'°* 2298' FSL, 1433' [--EL N 75.49 DEG W
SEC 3 T11N RSE ET
~ ~._ ,~- .... =_'"'__ 7372 (TO TARG )
RKB E~AnON' 1~' TARG~ LOCATION. %~ 4~ ¢
. ~ aa ~¢
2239' FSL, 1204' FEL ~~o~ ~*
SEC, 3, T11 N, RSE ~ ~°*~-
TARG~ -~b~ ~
KOP ~D=600 TMD=600 DEP=O ~=5870
900 _
._C 135o_
--
(:I) ~8oo_
Eb _
2250_
--
C)
~ 2700_
--
3150_
--
3600_
--
4050_
I -
I4500_
V
4950_
5850_
6300_
TMD=9902
6.00 DEP=7272
NORTH 1822
12.00 BUILO 3 DEG / 100' WEST 7040
18.00
24.00
B/ PERMAFROST TVD=1502 TMB=1539 DEP=226
30.00 T/ UGNU SNDS TVD=1547 TMD=1591 DEP=251
36.00
42.00
48.00
54.00 T/ W SAK SNDS TVD=2192 TMD=2482 DEP=855
60.00 EOC TVD=2284 TMD=2661 DEP=IO08
RECEIVED
Alaska Oil & 8as Cons. Commission
Anchore ..,,
B/ W SAK SNDS 1¥D=2672 TMD=3484 DEP=1734
9 5/8" CSG PT TVD=2872 TMD=3908 DEP=2107
K-lO TVD=3027 TMD=4236 DEP=2597
K-5 '[VD=4542 TMD=7446 DEP=5227
MAXIMUM ANGLE
61.84 DEG
_2250
SURFACE LOCATION:
417' FSL, 556' F'WL
SEC. 1, T11N, R8E
BEGIN ANGLE DROP TVD=5186 TMD=8810 DEP=6429 60.00
56.00
DROP 2 DE(;; / 100' 52.00
4-8.00
HRZ TVD=5710 TMD=9686 DEP=7127
42.00
TARGET - T/ KUP SNDS (EOD) TVD=5870 TMD=9903 DEP=727g
TARGET ANGLE T/ ZONE A TVD=5873 TMD=9g06 DE
T/ A3 SNDS ~VD:5887 TMD:9..q24 DEP:7286
40 DEG B/ KUP SNDS rVD=S999 TMD=~O070 DEP=7380
TD / ?" CSG PT TVD=61§2 TMD=10270 DEP=7§09
450 0 450 900 1350 1800 2250 2700 5150 3600 4050 4500 4950 5400 5850 6500 6750 7200 7650
Scale 1 : 225.00
Vertical Section on 284.51 azimuth with reference 0.00 N, 0.00 E from slot #22
_1800
_ /%
1350 I
I
_ 900 Z
_ 0
_ 450 ---I-
--
_ 0 ~
..
--
_ 450 g
Created by : jones
Date plotted : 9-May-95
Plot Reference is 22 Version ~5.
Coordinates are in feet reference slat
true Vertical Depths are reference RKB.
--- Baker Hughes INTEQ ---
ARCO ALASKA,
Structure : Pad 2T
Well: 22
Field : Kuparuk River Unit Location : North Slope, Alaska
<-- Wesf Scale 1. lO.OO
280 260 240 220 200 180 160 140 120 1 O0 80 60 40 20 0 20 40 60
260 I I II . I I 260
240
220 ~ )0
2OO
1500
180
1400
100
700 1000
11 O0 24O
220
2OO
180
160
140O
120
100
80
6o
160
140 1300 140
100
1200
1500
1800
1100 1700
120O
1500
160O
900
800
600
8OO
7OO
110 900
590O
~o
I
100
I
80
Z
~o 0
.___i_.
,
40 ~'
2O
3800
140C
1900
2O
0
60 _
0
..
~- 8O
100
1600
370O
i400
1200
18O0 20
~20O
1100
1700
1000 /~ oCO
1600 60 ~__
3500 1500 ~ ~
1300 ./~00 80 · '
0
100 0
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 20 40 60
< West Scale 1 · 10.00
Jcreated by : jones
jDate plotted : 9-May-g5
JPIot Reference is 22 Version #5.
jCoordinates are in feet reference slot #22.
jTrue Vertical Depths are reference RKB.
--- Baker Hughes INTEQ ---
I
ARCO ALASKA,
]D_C.
Structure : Pad 2T
Well: 22
Field : Kuparuk River Unit Location : North Slope, Alaska
<-- West co,e . 0.oo
440 440
1600
4900
400 400
360 4800 ,.,~ot) 360
320 1800 s~g~) 320
4700
280 280
24O
200
J 160
C- 120
· J ·
L
O ~o
40 _
120 _
0
0
_
0
cq 160 J
..
~ 200
460o 1700
44O0
430O
2300
22OO
2000
19 O0
18OO
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
920 880 840 800 760 720 680 640 600 560 520 480 440 400 .$60 320 280
< West Scale1' 20.00
24O
200 j
160 J
,207
O
4O
_ 40
120
o
o
__
160
,,
200 0
.dPARUK RIVER
UNIT
20" DIVERTER SCHEMATIC
I4
5
3
DO NOT SHUT IN DIVERTER
AND VALVE AT SAME TIME
UNDER ANY CIRCUMSTANCES.
.
.
MAINTENANCE & OPER/~TION
UPON INITIAL INSTALLATION:
· CLOSE VALVE AND FILL PREVENTER WITH WATER TO
ENSURE NO LEAKS.
· CLOSE PREVENTER TO VERIFY OPERATION AND
THAT THE VALVE OPENS IMMEDIATELY.
CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN
INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED.
OPEN VALVE TO ACHIEVE DIVERSION.
ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS
DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b)
1. 16" CONDUCTOR.
2. SLIP-ON WELD STARTING HEAD.
3. DIVERTER ASSEMBLY WITH ONE 2-1/16"- 2000 PSI BALL VALVE.
4. 20" - 2000 PSI DRILLING SPOOL WITH ONE 16" OUTLET.
5. ONE 16" HCR KNIFE VALVE WITH 16" DIVERTER LINE. THE VALVE OPENS AUTOMATICALLY UPON
CLOSURE OF ANNULAR PREVENTER. DIVERTER LINE WILL BE PLACED FOR OPTIMUM DISPERSION IN
PREVAILING WIND CONDITIONS.
6. 20" - 2000 PSI ANNULAR PREVENTER.
DKP 11/9/94
<
<
,6 ,
5
13 5/8" 5000 PSISTACK
ACCUMULATOR CAPACITy TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAUUC FLUID.
2_ ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER UMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH WATER.
2- CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD. ALL OTHERS OPEN.
4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 3 MINUTES.
INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 3 MINUTES.
BLEED TO ZERO PSI.
5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE UNE
VALVES.
6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES.
7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4.
CONTINUE TESTING ALL VALVES, LINES, AND CHOKES WITH A 250 PSI
LOW AND 3000 PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST
ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE.
8. OPEN TOP PIPE RAMS AND CLOSE BO3-FOM PIPE RAMS. TEST BOTTOM
RAMS TO 250 PSI AND 3000 PSI FOR 3 MINUTES.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BUND RAMS AND TEST TO 3000 PSI FOR 3 MINUTES. BLEED TO
ZERO PSI.
10. OPEN BUND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD
AND MNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 3000 PSI FOR 3 MINUTES.
12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP.
13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM.
SIGN AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY.
1. 16"-2000 PSI STARTING HEAD
2_ 11" - 3000 PSI CASING HEAD
3. 11" - 3000 PSI X 1:~5/8" - 5000 PSI
SPACER SPOOL
4. 13~5/8"- 5000 PSI PIPE RAMS
5. 13-5/8" - 5000 PSI DRLG SPOOLW/
CHOKE AND KILL UNES
6. 1:~5/8" - 5000 PSI DOUBLE RAM W/
PIPE RAMS ON TOP, BUND RAMS ON BTM
7. 1::~5/8" - 5000 PSI ANNULAR
WELL PERMIT CHECKLIST
oo,.
WELL NAME
GEOL AREA
PROGRAM: exp [] dev~ redrll [] serv []
/?/,~',~ o~/o~ sso~
ADMINISTRATION
ENGINEERING
1. Permit fee attached ................... ~Y
2. Lease number appropriate ................ IY
3. Unique well name and number ...............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary., tY
6. Well located proper distance from other wells ......
'7. Sufficient acreage available in drilling unit ...... ~Y
8. If deviated, is wellbore plat included ......... IY
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order .....
12. Permit can be issued without administrative approval..
13. Can permit be approved before 15-day wait ........
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
CMT will cover all known productive horizons ......
Casing designs adequate for C, T, B & permafrost ....
Adequate tankage or reserve pit .............
If a re-drill, has a 10-403 for abndnmnt been approved.
Adequate wellbore separation proposed ..........
If diverter required, is it adequate ..........
Drilling fluid program schematic & equip list adequate
BOPEs adequate .....................
Conductor string provided ............... ~ N
Surface casing protects all known USDWs ........ ~ N
CMT vol adequate to circulate on conductor & surf csg..~ N
CMT vol adequate to tie-in long string to surf csg . . Y ~
BOPE press rating adequate; test to %~ pstg.' ~ N
Choke manifold complies w/API RP-53 ('Ma~' 84) ....... 4~-~..~J~
Work will occur without operation shutdown ....... ~ N
Is presence of H2S gas probable ............ ~ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .... Y/
31. Data presented on potential overpressure zones .. .... Y//~
32. Seismic analysis 9f shallow gas zones .......... ~ N /~,/.. '7--
33. Seabed condition survey (if off-shore) ........ /Y N
34. Contact name/phone for weekly progress reports . . ./ . Y N .
[exploratory only] // .
GEOLOGY: ENGINEERING: COMMISSION:
Co~m~ts/Instructions:
HOW/jo - A:%'=ORMS%cheklist rev 03/94
Well History File
APPENDIX
Information of detailed nature that is not .
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER
· SCHLUMBERGER *
COMPANY NAME : ARCO ALASKA~ INC.
WELL NAME : 2T-22
FIELD NAME : KUPARUK RIVER
BOROUGH : NORTH SLOPE
STATE : ALASKA
AP1 NUMBER : 50-~03-20224-00
REFERENCE NO : 95232
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
10-OCT-ggg5 15:39
· =*, REEL HEADER *=~*
SERVICE NAME : EDIT
DATE : 95/19/19
ORIGIN : FLIC
REEL NAME : 95232
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA, INC., KUPARUK 2T-22, API #59-~93-20224-99
· ~, TAPE HEADER
SERVICE NAME : EDIT
DATE : 95/19/19
ORIGIN : FLIC
TAPE NAME : 95232
CONTINUATION # : ~
PREVIOUS TAPE :
COMMENT : ARCO ALASKA, INC., KUPARUK 2T-22, API #59-993-29224-99
TAPE HEADER
KUPARUK RIVER
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
2T-22
599032922499
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
99-06T-95
BlT RUN 1 BIT RUN 2 BIT RUN 3
JOB NUMBER: 95232 95232
LOGGING ENGINEER: GREEN GREEN
OPERATOR WITNESS: MORRISON MORRISON
SURFACE LOCATION
SECTION: 9
TOWNSHIP: ~N
RANGE: 8E
FNL:
FSL:
FEL:
FWL: 556
ELEVATION(FT FROM MSL 9)
KELLY BUSHING: 122.9~
DERRICK FLOOR: 122.0e
GROUND LEVEL: 89.7e
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 8.59e 9.625 3958.9
2ND STRING
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
10-0CT-1995 15:30
3RD STRING
PRODUCTION STRING
REMARKS:
Well drilled 20-JUN through 24-JUN-95 with CDR only,
All data was collec%ed in two bit runs, No depth
shifting was done at ARCO's request.
$
$
**** FILE HEADER *=,=
FILE NAME : EDIT ,001
SERVICE : FLIC
VERSION : 001C01
DATE : 95/10/1~
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
PAGE:
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Dep%h shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
MWD 4150.~ 10193.0
$
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH MWD
$
MERGED DATA SOURCE
LDWG TOOL CODE
MAD
$
REMARKS:
BlT RUN NO. MERGE TOP
MERGE BASE
4150.e 4740.0
4740.0 9075.0
9075.0 10193.0
This file contains ~he Very Enhanced resisi~ivity
(QRO processing) with 2' average that was repro-
cessed at GeoQuest Anchorage. It also contains
merged and edited files from Bit Runs 1 & 2.
$
LIS FORMAT DATA
LIS Tape Verificaf, ion Lis~,|ng
Schlumberger Alaska Compu~,|ng Cent, er
10-0¢T-1995 15:30
PAGE:
DATA FORMAT SPECIFICATION RECORD
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 36
4 66
5 66
6 73
7 65
8 68
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66
0 66 0
SET TYPE - CHAN **
NAME SERV UNIT SERVICE AP1 APl AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 57028 00 0~0 ~0 0 1 1 I 4 68 0000000~0
RA MWD OHMM 57028 Oe 0~0 ee e 1 I 1 4 68 00eOe00000
RP MWD OHMM 57028 00 00e 00 0 1 1 1 4 68 ooeoeooe00
VRA MWD OHMM 57028 00 0~0 00 e 1 I 1 4 68 0000ee0000
VRP MWD OHMM 57~28 00 000 00 0 1 I 1 4 68 0000000000
DER MWD OHMM 57028 00 ~0 00 0 ! 1 I 4 68 0000000000
ROP MWD FPHR 57028 0~ 000 0~ ~ 1 1 1 4 68 ~000000000
GE MWD GAPI 57028 00 000 00 0 1 1 1 4 68 0000000000
FET MWD HR 57028 00 0~0 00 0 1 1 1 4 68 000000~000
DATA
DEPT. 10193.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD
VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD 89.552 GR.MWD
FET.MWD -999.250
DEPT. 4150.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD
VRP,MWD -999.250 DER,MWD -999.250 ROP.MWD -999,250 GR.MWD
FET.MWD -999.250
-999.250
-999.250
-999.250
74.050
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
1~-0CT-1995 15:30
PAGE:
END OF DATA **
**** FILE TRAILER
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : 0~1C01
DATE : 95/i0/i0
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER
FILE NAME : EDIT
SERVICE : FLIC
VERSION : 99iC91
DATE : 95/i9/i9
MAX REC SIZE : 1924
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: 9.5999
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
MAD
$
MERGED DATA SOURCE
LDWG TOOL CODE
4749.9
MAD RUN NO. MAD PASS NO.
MERGE TOP MERGE BASE
$
REMARKS: This file is the MAD pass run on Bit Run i, from 4i59'
to 4749;. No depth shifts were made at ARCO's request,
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
10-0CT-199~ 1~:30
DATA FORMAT SPECIFICATION RECORD
SET TYPE - 64EB ~
TYPE REPR CODE VALUE
1 66 0
2 66 0
$ 73 28
4 66
S 66
6 73
?
8 68 0.S
9 65 FT
11 66 36
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
SET TYPE - CHAN **
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 57028 eO ~00 00 0 2
RA MAD OHMM 57028 00 ~00 eO 0 2 1 1 4 68 00~0000000
RP MAD OHMM 57028 00 ~00 00 0 2 1 1 4 68 ~0~0~00000
DER MAD OHMM 57028 ~0 00~ 00 0 2 1 1 4 68 0~00000~00
ROP MAD FPHR 57~28 ~0 0~0 00 0 2 1 1 4 68 00~0~00000
GR MAD GAPI 57028 ~0 00~ 00 0 2 1 1 4 68 00eooooe00
FET MAD HR 57028 00 000 00 0 2 1 1 4 68
** DATA **
DEPT. 474e.eee RA.MAD $.417 RP.MAD 3.e82 DER.MAD
ROP.MAD 1385.951 GR.MAD 84,.112 FET,.MAD 0.3~0
3.183
END OF DATA
LIS Tape Verification L|sting
Schlumberger Alaska Computing Center
*=** FILE TRAILER =***
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : 001C01
DATE : 95/10/10
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
10-0CT-199~ 1~:30
PAGE:
**=, TAPE TRAILER ,**=
SERVICE NAME : EDIT
DATE : 95/10/10
ORIGIN : FLIC
TAPE NAME : 95232
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA~ INC.~ KUPARUK 2T-22~ API #50-103-20224-~
*~, REEL TRAILER
SERVICE NAME : EDIT
DATE :
ORIGIN : FLIC
REEL NAME : 95232
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA~ INC., KUPARUK 2T-22, API #50-1~3-20224-~0