Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-0861. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 10193'feet None feet true vertical 6107' feet None feet Effective Depth measured 10193'feet 9653', 9768'feet true vertical 6107' feet 5693', 5779' feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth) 3-1/2" L-80 9793' MD 5798' TVD Packers and SSSV (type, measured and true vertical depth) 9653' MD 9768' MD N/A 5693' TVD 5779' TVD N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title:Contact Phone: N/A Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 386 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: FHL Rtrvbl Packer 47B2 Packer: Bkaer SABL-3 Perm Packer SSSV: None Katherine O'Connor katherine.oconnor@conocophillips.com (907) 263-3718Senior Well Interventions Engineer 9866-9875', 9895-9899', 9905-9925', 9954-9970' 5854-5860', 5876-5879', 5883-5899', 5921-5933' measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) Well Remains offline Gas-Mcf MD 1200 Size 121' ~~~ 100 269262 ~ measured TVD 7" 7" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 195-086 50-103-20224-00-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0025568, ADL2225569 Kuparuk River Field/ Kuparuk River Oil Pool KRU 2T-22 Plugs Junk measured Length Production Liner 1712' 8435' Casing 1688' 6099' 1751' 10183' 3917' 121'Conductor Surface Tie Back String 16" 9-5/8" 80' 3958' 2883' Burst Collapse Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Gavin Gluyas at 8:05 am, Feb 26, 2025 Digitally signed by Katherine O'Connor DN: CN=Katherine O'Connor, O= ConocoPhillips, OU=Wells Group, E= katherine.oconnor@conocophillips.com, C=US Reason: I am the author of this document Location: Date: 2025.02.25 15:13:49-09'00' Foxit PDF Editor Version: 13.0.0 Katherine O'Connor JJL 02/27/25 RBDMS JSB 030325 DSR-2/28/25 DTTMSTART JOBTYP SUMMARYOPS 1/17/2025 OPTIMIZE WELL MIRU CTU 4 W/ 11,875' OF 2.0". DRY TAG AT 9888' CTMD, CLEAN TO 9918', NOT ABLE TO MAINTAIN RETURNS. BRING GL ON @ 375 MCPD AND WALK IT UP TO 700 MCFD. CLEANOUT 9,888' TO 9930'. JOB IN PROGRESS. 1/18/2025 OPTIMIZE WELL CONTINUE CLEANOUT FROM 9930' TO 10,000'. FREEZE PROTECT TUBING WITH 25 BBL DIESEL. 1/18/2025 MAINTAIN WELL FREEZE PROTECT PUMP 20 BBLS OF DSL DWN TBG FOLLWED BY 5 BBLS METH DWN FL JOB COMPLETE 2/1/2025 OPTIMIZE WELL TEL TAG TBG TAIL @ 9752' SLM (9792' RKB) 40' CORRECTION. DRIFT WITH 10' X 2.50" DMY PERF DRIFT, TAG FILL @ 9887' SLM (9927' RKB). PERFORM SBHPS ( SEE COMMENTS FOR DETAILS)(MAX = 1847 PSI). READY FOR E-LINE 2/3/2025 OPTIMIZE WELL RIH W/ 2 1/8" X 4' SPIRAL STRIP GUN. SIT DOWN ON PACKER AT 9653' RKB WITH GUN. AFTER SEVERAL ATTEMPTS OF TRYING TO GET THROUGH PACKER STRIP GUN WAS DAMAGED AND TOOLSTRING WAS LOSING GROUND. POOH AND REBUILD GUN WITH DIFFERENT BOTTOM. JOB IN PROGRESS. 2/4/2025 OPTIMIZE WELL RUN 1: PERFORATE INTERVAL: 9895' - 9899', W/ 2.125" SPRAL STRIP GUN RUN 2: PERFORATE INTERVAL: 9866' - 9875', W/ 2.125" SPIRAL STRIP GUN JOB COMPLETE 2/7/2025 MAINTAIN WELL HOT DSL FLUSH PUMP 80 BBLS OF 180* DSL DWN TBG PUMP 10 BBLS OF 180* DSL DWN FL JOB COMPLETE 2/16/2025 MAINTAIN WELL FREEZE PROTECT TBG WITH 20 BBLS DSL & FL WITH 5 BBS METHANOL 2T-22 Perforations Summary of Operations Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag: RKB 9,927.0 2T-22 2/1/2025 rogerba Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Add Perfs 2T-22 2/4/2025 bworthi1 Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 16 15.06 41.0 121.0 121.0 62.58 H-40 WELDED SURFACE 9 5/8 8.70 41.0 3,958.4 2,883.0 40.00 L-80 BTC TIE BACK STRING 7 6.28 38.6 1,751.0 1,687.8 26.00 L-80 Hyd563 PRODUCTION ORIGINAL 7 6.28 1,748.0 10,183.0 6,099.2 26.00 L-80 BTCM Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 36.8 Set Depth … 9,745.0 Set Depth … 5,762.0 String Max No… 3 1/2 Tubing Description Tubing – Gas Injection Wt (lb/ft) 9.30 Grade L-80 Top Connection HYD563 ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 36.8 36.8 0.00 HANGER 10.850 FMC Gen IV Tubing Hanger (6'' x 3 1/2'' HYD563 pin x 3-1/2" EUE box) w/ 3.54' 3-1/2" HYD563 9.3# L-80 pup jt FMC TC-1A- EN 2.992 3,374.4 2,611.3 62.63 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV SN 20819-01 VanOil MMG 2.920 6,425.4 4,029.5 62.48 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV SN 20819-12 VanOil MMG 2.920 7,870.2 4,710.9 61.97 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- SOV SN 20819-04 VanOil MMG 2.920 9,459.7 5,549.7 43.52 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DV SN 20819-07 VanOil MMG 2.920 9,579.6 5,638.1 41.80 GAS LIFT 5.968 Vanoil 3 1/2'' x 1.5'' MMG GLM- DCR-1 SOV SN 20819-15 VanOil MMG 2.920 9,639.2 5,682.7 41.58 PBR 5.880 PBR 80-40 H683-19-0140 4" seals 11.80" seal length TSH TSH 2.992 9,652.9 5,693.0 41.58 PACKER 5.970 FHL Ret Packer 47B2 - 7" 26# H781 -20-0025 Baker FHL 2.992 9,710.3 5,735.9 41.50 NIPPLE 4.500 3 1/2" x 2.913" X-Profile Landing Nipple, TSH 563 BxP x TSH X-Profile 2.813 9,737.4 5,756.2 41.27 OVERSHOT 6.030 Baker non sealing Overshot Bowen Bowen 3.500 Top (ftKB) 9,740.0 Set Depth … 9,793.3 Set Depth … 5,798.4 String Max No… 3 1/2 Tubing Description Tubing – Production Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE-abm ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 9,757.3 5,771.2 41.10 NIPPLE 4.500 CAMCO W-1 SELECTIVE LANDING NIPPLE CAMCO W-1 2.812 9,767.4 5,778.8 41.01 SEAL ASSY 4.750 BAKER KBH-22 ANCHOR SEAL ASSEMBLY BAKER KBH-22 3.000 9,768.3 5,779.5 41.00 PACKER 5.687 BAKER SABL-3 PERMANENT PACKER BAKER SABL-3 3.250 9,783.3 5,790.8 40.87 NIPPLE 4.500 CAMCO D NIPPLE w/2.795" NO GO CAMCO D 2.750 9,792.4 5,797.7 40.80 SOS 4.000 BAKER SHEAR OUT BAKER 2.992 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 9,740.0 5,758.2 41.25 TUBING CUT TUBING JET CUT 1/9/2019 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 3,374.4 2,611.3 62.63 1 GAS LIFT GLV RK 1 1/2 1,259.0 4/8/2023 0.188 6,425.4 4,029.5 62.48 2 GAS LIFT GLV RK 1 1/2 1,249.0 4/8/2023 0.188 7,870.2 4,710.9 61.97 3 GAS LIFT GLV RK 1 1/2 1,236.0 4/8/2023 0.188 9,459.7 5,549.7 43.52 4 GAS LIFT DMY RK 1 1/2 0.0 2/19/2019 0.000 9,579.6 5,638.1 41.80 5 GAS LIFT OV RK 1 1/2 0.0 4/8/2023 0.250 Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 1,734.1 1,673.5 31.75 Stage Collar 7.000 HES Cementer HYD563 Halliburto n HES 6.276 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 9,866.0 9,875.0 5,853.6 5,860.4 C-4, 2T-22 2/4/2025 6.0 APERF 2 1/8" STRIP GUN, SHOGUN N.T./S.D.P. 6 SPF 60 DEG. 9,895.0 9,899.0 5,875.7 5,878.7 A-4, 2T-22 2/4/2025 6.0 APERF 2 1/8" STRIP GUN, SHOGUN N.T./S.D.P. 6 SPF 60 DEG. 9,905.0 9,925.0 5,883.3 5,898.6 A-3, 2T-22 8/31/1995 4.0 IPERF 2 1/8" Enerjet; 180° Ph; Orient (+/-) 90° 9,954.0 9,970.0 5,920.9 5,933.2 A-2, 2T-22 1/17/2002 6.0 APERF 2.5" HSD PJ Chgs, 60° ph 2T-22, 2/20/2025 11:38:00 AM Vertical schematic (actual) PRODUCTION ORIGINAL; 1,748.1-10,183.0 APERF; 9,954.0-9,970.0 IPERF; 9,905.0-9,925.0 APERF; 9,895.0-9,899.0 APERF; 9,866.0-9,875.0 PACKER; 9,768.3 TUBING CUT; 9,740.0 NIPPLE; 9,710.3 PACKER; 9,652.9 GAS LIFT; 9,579.6 GAS LIFT; 9,459.7 GAS LIFT; 7,870.2 GAS LIFT; 6,425.4 SURFACE; 41.0-3,958.4 GAS LIFT; 3,374.4 TIE BACK STRING; 38.6- 1,751.0 CONDUCTOR; 41.0-121.0 HANGER; 36.8 KUP PROD KB-Grd (ft) 41.00 RR Date 6/25/1995 Other Elev… 2T-22 ... TD Act Btm (ftKB) 10,193.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 501032022400 Wellbore Status PROD Max Angle & MD Incl (°) 64.98 MD (ftKB) 6,050.00 WELLNAME WELLBORE2T-22 Annotation Last WO: End Date 2/20/2019 H2S (ppm) 60 Date 11/20/2015 Comment SSSV: NONE ORIGINATED TRANSMITTAL DATE: 2/19/2025 ALASKA E-LINE SERVICES TRANSMITTAL #: 5279 42260 Kenai Spur Hwy PO BOX 1481 - Kenai, Alaska 99611 FIELD Kuparuk PH: (907) 283-7374 FAX: (907) 283-7378 DELIVERABLE DESCRIPTION TICKET # WELL # API # LOG DESCRIPTION DATE OF LOG 5279 2T-22 50103202240000 Perf Record 3-Feb-2025 RECIPIENTS Conoco DIGITAL FILES PRINTS CD'S 1 FTP Transfer 0 0 USPS Attn: NSK-69 Richard.E.Elgarico@conocophillips.com 700 G Street Anchorage, AK 99503 Received By: Received By: Signature Signature AOGCC DIGITAL FILES PRINTS CD'S 1 ShareFile 0 0 USPS Attn: Natural Resources Technician II abby.bell@alaska.gov Alaska Oil & Gas Conservation Commision aogcc.data@alaska.gov 333 W. 7th Ave, Suite 100 - Anchorage, AK 99501 Received By: Received By: Signature Signature 195-086 T40102 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.02.19 15:21:12 -09'00' DNR DIGITAL FILES PRINTS CD'S 1 SharePoint Link 0 0 USPS Attn: Natural Resource Tech II DOG.Redata@alaska.gov 550 West 7th Ave, Suite #802 - Anchorage, AK 99501 Delivery Method: USPS Received By: Received By: Signature Signature Please return via e-mail a copy to both: AR@ake- line.com AKGGREDTSupport@ConocoPhillips.onmicrosoft.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS HLCEIVED MAR 2 2 2019 1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing Opera' h Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑+ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well B Re-enter Susp Well ❑ Other: ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: ConocoPhillips Alaska, Inc. Development p Strafigraphic❑ Exploratory❑ Service❑ 195-086 3. Address: P. O. Box 100360, Anchorage, 6. API Number: Alaska 99510 50-103-20224-00 7. Property Designation (Lease Number): 8, Well Name and Number: KRU 2T-22 ADL 25568 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 10,193 feet Plugs measured 9781 feet true vertical 6,107 feet Junk measured None feet Effective Depth measured 9,978 feet Packer measured 9653, 9768 feet true vertical 5,940 feet true vertical 5693, 5780 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 feet 16 121' MD 121' TVD SURFACE 3,917 feet 95/81, 3,958' MD 2883' TVD TIE BACK STRING 1,712 feet 7 " 1,751' MD 1688'TVD PRODUCTION 8,435 feet 7 10,183' MD 6099' TVD Perforation depth: Measured depth: 9905-9225. 9954-9970 feet True Vertical depth: 5883-5899. 5920-5933 feet Tubing (size, grade, measured and true vertical depth) 3.5 " L-80 9,793' MD 5,798' TVD Packers and SSSV (type, measured and true vertical depth) PACKER - FHL RET PACKER 47132 9,653' MD 5,693' TVD PACKER - BAKER SABL-3 PERM. PACKER 9,768' MD 5,780' TVD SSSV -NONE 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: SHUT -N - - - - Subsequent to operation: SHUT-IN - - - - 14. Attachments (required per 20 AAC 25.070, 25.077, 825.283) 15. Well Class after work: Daily Report of Well Operations O Exploratory ❑ Development 21 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run Cl 16. Well Status after work: Oil O Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ >USP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318-484 Contact Name. Dusty Ward Authorized Name: Dusty Ward Contact Email: Dusty.Ward@cop.com Authorized Tile: Sr. Wells Engineer Authorized Signature: '77—a-g(lwl Date 1 n contact Phone: (907) 265-6531 un-07UVISMOT R MAR ZO( 1 ConocoPhillips AasKa. Inc. KUP PROD WELL -NAME 2T-22 RIVER UNIT NONE w0: WELLBORE 2T-22 ST.1].9^d1 S995fi.3zAM Last Tag NNIANI =ec So l aNmdmn prem(nKel End Ezm won.. Lon Mosey Last Tag'. RKB I 9,916.0 IdSeA2018 2T-22 learges, Last Rev Reason HANGER, 36.9 1 Mnodtian EnEDad Wellsom Gooled By Rev Reason'. Installed Gas Lill Design 2/2512019 27-22 zembaej Casing Strings Cminiteempnon oO (in) men) Top(MID See Eepm (AINS) See pepin PVD), MLen p... G,ese Toprnrtas CONDUCTOR 16 1506 41.0 121.0 121.0 62.58 Hd WELDED i.n CONDUCTOR, 41 au' 0 Cal Deswanden SURFACE 00(In) E)pin 9618 8.70 Rea ave) Bet Oeom IRKED sm,E mIN01... WYLen g... Grass 41.0 3,9564 2,883.0 40M LF Top TOrtas BTC Dasdp 13-lpmen .0 (In) ID lin) Top MKel Be am e1K01 Bel Deem IN61....n11... GrWe Top Tpddl TIE BACK STRING 7 6.28 38.6 1,7510 1,68)8 2800 L-80 HydI cae, ne ")men PRODUCTION ORIGINAL Opllnl Ip llnl 7 6.28 top 1X1(81 9N DegF non.) Bel Depal II sSN WIILen 11 InW 1,7460 10,183.0 6,0992 26.00 L-80 Top Thread BTCM PmJV F141-UwJ; 376 x,150.01 m.371WNDS6 Tubing Strings Rising Dec"Intin Sema Ma..IDIIn) TOPmK- set Depth m.. an"Re'L.. WtONX) Gose iep conn«eon TUBING GAS 3112 2.99 36.8 9,]450 -Oe 5)62.0 9.30 L-60 HYD563 INJECTION Completion Details Top RNID) Top Ins' Neminal TIE SACK STRING. daa TOP MK81 (XKB) p) I Idm Des Com 10(m) 17510 WA 36.8 0.00 HANGER FMC Gen IV TUI Pointer "x 3 pin x jI dud 2.992 bem)1v73.54' 3-12' HYD5639.3e L-00 pupil 9,63. 5.682.7 1 PBR PBR8040116811904 4'ESDS ll. -sealleng0 2992 wsunranA4 96529 5,693.0 41.58 PACKER FHL Ret Pandoor 4]82-7"26k H781-20-0025 2,992 9,]103 5,735.9 41.50 NIPPLE 3112"x2.91S'X-Profle Landing Nipple, TSH 563 Ben x 2,813 9,7374 57562 4127 OVERSHOT Baker non sealing Overshot 3.500 TUM,l9 Desertion 3--i.-M. 10 (In) Top inns) Sn Depth nl- Se, peplh RrvD) 6.. Wi9w6 Grate Top ConnMlon TUBING ORIGINAL 312 299 9]40.0 9]93.3 5,]964 930 L-80 EUEabm SGRFA a 41,0406 � Completion Debits Anmlw Few -a sdmA z+.. To�tIK961 ro Nominal B.Tw D; v19•Ala Topples) f'nd Idm Cec Com On) wsUFT; g4z54 9,79 .3 5p12 41.10 NIPPLE CAMCO W -)SELECTIVE LANDING NIPPLE 2.812 9.7674 5,]]8.8 41.01 SEAL ABY BAKER KBH-22 ANCHOR SEAL ASSEMBLY 3.000 9.7683 5]]9.5 41.00 PACKER BAKER SAB43 PERMANENT PACKER 3.250 GASUFT', 7A702 9,783.3 5,]90.8 4087 NIPPLE CAMPO D NIPPLE w2 TIES' NO GO 2.750 91924 5,191,7 40.80 SOS BAKER SHEAR OUT 2.992 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top RVel Topmd ..UFT5R ;g4] To UKKRD I r) ped Com Ron Del. ID (in) 9,7400 5,758.2 41.25 TUBING CUT TUBING JET CUT 1192019 0000 9,7809 5,789.0 40.89 PLUG 1.81- CA -2 PLUG(OAL=26'7 41272018 0.000 9,7830 SINS 40.87 NIPPLE AZ,o Dx 1.81'Uns' REDUCER(OAL=2J') 9112/2016 1.81 GASBR;6sn's REDUCER Perforations 8 Slots sent ane FBR.98E.a Top RTv01 BM (NDI (eM1ObIR PACKER; 86528 Top pIMO) BImRPo(81 (11K01 MIKE) LlnMes Sn„e Dad ) Ten COm 9.9050 9,925.0 5,8833 5,898.6 A-3, 2T-22 813111995 4.0 IPERF 2 16 Enerjet: P', Oriem (41-) 90° NIPPLE: 97109 9,9540 9,970.0 5,9209 5,9332 A-227-22 V1L2W2 6.0 APERF 25"HSD PJ Chgs, 0 pM1 Notes: General S Safety End pare Allemande 311412019 NOTE: VIEW SCHEMATIC A'Alaska Schemawell).0 Ran.CDT; 9ia0,0 OYER.HOT ),Ts74 NIPPLE, PACKER;9]W.9 PL60; 9,]&1.9 NVPIF;'7RER NIPPLE REODLER, 9>ala sOs; 1114 IPERR;....UpI APERF, 96,I,Teanii PRODGCTION DRIGINA- 1,TIR1-16,tai.0 Operations Summary (with Timelog Depths) 2T-22 1W Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time Our (hr) Phase Op Code AIrvity Code Time P-T-X Operation Start Depth (ftKB) End Depih(flKB) 1/14/2019 1/15/2019 12.00 MIRU RPCOMP MOB P Move Rig F/ 2T-27 t/ 2T-22 0.0 0.0 12:00 00:00 1/15/2019 1/15/2019 4.00 MIRU MOVE MOB T Continue to move rig f/ 27-27 t/ 2t 22 00:00 0400 Sub Base is spotted over well 2T-22 1/15/2019 1/16/2019 20.00 MIRU MOVE MOB T Standy due to phase 3 conditions 04:00 0000 1/16/2019 1/16/2019 1.00 MIRU MOVE MOB T Standby due to Phase 3 conditions. 00:00 01:00 1/16/2019 1/16/2019 10.00 MIRU MOVE RURD P Phase 3 conditions lifted. Continue 01:00 11:00 rigging up. Install plywood around cellar and wheel rooms for walkways. Install herculite secondary containment. Spot pit complex to sub. Install matts. Spot and set up cuttings pits tank. Connect steam lines, hoses and pit interconnects. Berm around rig. Spot smoke shack, enviirovac, mud shac. Prep cellar and tie in hard line for kill well operations. Take on fluid in pits to prepare 9.3 ppg NaCl kill weight fluid. Note: Rig accepted at 0900 hours. 1/16/2019 1/16/2019 0.50 COMPZN WELCTL PRTS P IA pressure approximately 225 psi. 11:00 11:30 Isolate IA from hard line and pump through filling line back to tiger tank. Pressure test line to approximately 500/2000 psi. Test good. Attempt to bleed of pressure from IA, unable to bleed off pressure, diesel flow returning to tiger tank. Shut well IA in. Blow down line. Offline: Continue to dilute 9.8 ppg KWF to 9.3 ppg KWF 1/16/2019 1/16/2019 1.00 COMPZN WELCTL MPSP P Rig up FMC lubricator. Pressure test 11:30 12:30 lubricator to 2000 psi for 5 minutes. Test good. Pull BPV. Secure well closing in lower master and swab valve. Offline: Continue to dilute 9.8 ppg KWF to 9.3 ppg KWF in preparation to kill well. 1/16/2019 1/16/2019 2.00 COMPZN WELCTL KLWL P Continue diluting 9.8 ppg fluid to 9.3 12:30 14:30 ppg KWF. Dilute a total volume of approximately 570 bbls. Build scaffolding around cellar area. PJSM on well kill operations. 1/16/2019 1/16/2019 3.50 COMPZN WELCTL KLWL P Observed 225 psi of pressure on IA. 14:30 18:00 Attempt to bleed off pressure, pressure would not bleed, diesel returns to tiger tank. Start pumping down tubing with 9.3ppg NaCL KWF @ 3 bbls with 280 - 540 psi on tubing and open choke 20% and take diesel returns though choke manifold to flow back tank after approximately 350 bbls around, observed 9.3 ppg KWF at manifold with gas cut mud. Pump an additional 50 this of 9.3 ppg KWF around and shut pump down. Shut well in and monitor. Blow down hard line and choke manifold. 1/16/2019 1/16/2019 1.00 COMPZN RPCOMP PRTS P Set FMC BEV and Test to 1000 psi f/ 18:00 19:00 below 5 mins All good Page 1138 Report Printed: 2/21/2019 o Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Steri Depth Start Time Emi Time Dur(m) Phase Op Code Activity Cone Time P -T -X Operation (ftKB) End Depth ^13) 1/16/2019 1/17/2019 5.00 COMPZN RPCOMP NUND P RID lines blow down same and N/D 19:00 00:00 FMC Tree and N/U BOP 1/17/2019 1/17/2019 3.00 COMPZN RPCOMP NUND P Continue to nipple 13 5/8" BOP stack 00:00 03:00 and associated hydraulic hoses. Install turn buckles, and riser. Offline load drill pipe in shed and strap. 1/17/2019 1/17/2019 5.00 COMPZN RPCOMP SVRG P Perform BOP maintmance inspection 03:00 08:00 open all ram doors and inspect all rams as per AOGCC agreement. 1/17/2019 1/17/2019 2.50 COMPZN RPCOMP OTHR P Pick up blanking plug, and install in 08:00 10:30 well head. Make up TAW to test joint and make up to top drive. Rig up hoses to top drive and choke. Fill BOP slack, surface lines and choke manifold purging air out of system. 1/17/2019 1/17/2019 6.00 COMPZN RPCOMP BOPE P Pressure lest BOPE 250/2500 PSI for 10:30 16:30 5 Min each as per test procedure. AOGCC rep Matthew Herrera waived witness. 1) Blind Rams, CMV 1. 2. 3. 16, Demco Kill, IBOP 2) CMV 4, 5, 6, HCR Kill, Lower Kelly Valve 3) CMV 7, 8, 9, Manual Kill, HT -38 FOSV 4) Super Choke, Manual Choke 5)Annular, CMV 10, 11, HT-381BOP 6) UVBR, CMV 13, 13, 15 7) CMV 14 8) HCR Choke 9) Manual Choke 10) LVBR Accumulator Drawdown test Lay down test joint and blow down choke and lines. 1/17/2019 1/17/2019 1.00 COMPZN RPCOMP RURD P RID test equipment and Pull test dart 16:30 17:30 and BPV and LID same 1/17/2019 1/17/2019 1.00 COMPZN RPCOMP PULL P RIH w/landing joint BOLDS and Pulled 17:30 18:30 Hanger to Floor PUW 100 U 135K Pulled free 20' up PUW 95K 1/17/2019 1/17/2019 1.50 COMPZN RPCOMP PUTB P CBU @ 5 BBls w/ 470 PSI No fluid 18:30 20:00 losses Shut down monitor well 15 mins all good 1/17/2019 1/1812019 4.00 COMPZN RPCOMP PULD P POOH and STD Back 4 stands in 20:00 00:00 derick 375' 3 1/2" Tubing become corkscrewed on std 5 could not Std Back start LID 3 1/2" Tubing in pipe shed 1/18/2019 1/18/2019 4.50 COMPZN RPCOMP PULD T Continue LID 31/2" EUE tubing 00:00 04:30 corkscrewed pipe @ 1571' out of hole. PUWT 85K and Joint 50 PUWT 35K lost String wt. Continued to LID 12 more Joint TOT joint LID 62 + 6' pup Joint. Back out of GLM # 6 ToT LID 1979.67'. GLM was 378' below surface when string parted. Top pup backed out of GLM # 6 with no over pull 1/18/2019 1/18/2019 7.50 COMPZN RPCOMP PULD T RIH with 4 stands of 3 1/2" tubing out 04:30 12:00 of derrick. POOH with 3 1/2" tubing laying out in singles. Clean rig floor. Prepare 3 1/2" drill pipe and 4 3/4" drill collars. Load and strap 3 1/2" HT 38 drill pipe and BHA# 1 Baker tools. Page 2138 Report Printed; 2/2112019 Operations Summary (with Timelog Depths) Awl 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Depth Stan Time End Time our (h) Phase op Cade Activity Code Time P-T-X Operatic, (W13) End Depth (ftKB) 1/18/2019 1/18/2019 3.00 COMPZN RPCOMP BHAH T Pick Baker Hughes Fishing BHA#1 12:00 15:00 as follows: 5 7/8" Overshot (4 3/8" grapples), 61/8" string mill, bumper sub, oil jars, 9- 4 3/4" Drill collars, cross over and 3 1/2" HT38 drill pipe. While picking up BHA unable to pass 5 7/8" overshot through wellhead. Making several attempts to stab into wellhead and rotate pipe, unsuccessful. Lay Down Fishing BHA #1. 1/18/2019 1/18/2019 1.00 COMPZN RPCOMP BHAH T Pick 3 1/2" mule shoe and 3 1/2" 15:00 16:00 HT38 drill pipe in singles. RIH to perform drift run and attempt to tag top of fish while waiting on E-line to set 3 3/8' IBP. 3 1/2" tool joint OD 5.2". Able to RIH to approximately 63.5' and tagging up. Unable to work through obstruction. POOH and lay down mule shoe and 2 singles. 1/18/2019 1/18/2019 5.00 COMPZN RPCOMP PACK T Wait on Alaska E-line to set 3 3/8" IBP. 16:00 21:00 R/U pollard E-line and RIH w/ RBP Tag up (41403' p/u and space out to 392' and set POOH and R/D pollard a- line 1/18/2019 1/18/2019 0.50 COMPZN RPCOMP PRTS P Test RBP and casing U 2000 psi 5 21:00 21:30 mins all good 1/18/2019 1/19/2019 2.50 COMPZN RPCOMP NUND P N/D BOP and prep f/ Hydratight 21:30 00:00 procedure 1/19/2019 1/19/2019 10.00 COMPZN RPCOMP PUTB P PJSM. Rig up Hydra Tight equipment 00:00 10:00 and run in rods and allow 7" casing to grow. During occasional cycles casing would jump and psilgrowth would increase. Casing decompressing from buckling as well as releasing torsional strain (uncork-screwing) slightly. After 34 cycles casing grew approximately 20 1/2". Stay rigged up and allow and monitor casing without cycling, observed residual growth of 1". Continued to monitor further to ensure casing growth complete. Total casing growth from flange to flange measurement of 21 1/2". Rig down Hydra Tight equipment and remove 7" tubing head spool. 1/19/2019 1119/2019 4.00 COMPZN RPCOMP CUTP P Perform rough cut and cut 10:00 14:00 approximately 11" of 7" casing off. Remove 7" packoff. Pick up Baker 7" spear engage spear into 7" stump. Pick up on 7" spear with 100kslring weight( block wt 30K) and stretch 7" casing an additional 12.5". Slack off weight and set casing slips with 50k overfull. Total casing removed 34". Lay down spear 1/19/2019 1/19/2019 1.00 COMPZN RPCOMP WWSP P Wachs cut 7" excess casing. Install 14:00 15:00 packoff and energize pack off with 200 ftlbs per compression bolt. 1/19/2019 1/19/2019 5.50 COMPZN RPCOMP NUND P Nipple up 11" 3M x 13 5/8" 5M DSA. 15:00 20:30 Rig up 13 5/8" BOPE. Change out lower VBR's to 7" casing rams. 1/19/2019 1/19/2019 2.00 COMPZN RPCOMP ROPE P M/U 7" test joint and test 7" rams U 20:30 22:30 250/2500 5 mins each Allgood RID test joint and clean up floor and prep f/ slick line Page 3138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth start Time End Time Dis (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth(ftKB) 1/19/2019 1/20/2019 1.50 COMPZN RPCOMP SLKL P PJSM R/U Slick line M/U Baker over 22:30 00:00 shot and RIH 1/20/2019 1/20/2019 2.50 COMPZN RPCOMP SLKL P RIH w/ slick line with 5.37 OD over 00:00 02:30 shot and latch on to RBP @ 392',Pull release RBP and POOH UD same M/U GR 5.95 Drift RIH U 398' and tag up No go POOH and M/U 3.50 GR Drift RIH T/ 1988' Tag lop of fish 1988'w/ WLM POOH and RID Slick line unit 1/20/2019 1/20/2019 3.00 COMPZN RPCOMP WAIT P Wait on pollard E -Line unit for CBL 02:30 05:30 logs 1/20/2019 1/20/2019 4.50 COMPZN RPCOMP ELOG P PJSM with crew and Alaska -E -Line. 05:30 10:00 RU E -line logging unit. Attempt to RIH with CBL logging tools, unable to get past 403'. Losing all tension at 403', able to pick back up without any over pull, regain normal tension on line. Attempt several times, largest OD on tool is 3.25". POOH and lay down gamma ray tool, shortening tool string length. Attempt to RIH with shortened tool string, unable to get past 403'. Decision made to POOH and run Halliburton 40 arm caliper log while wailing on SLB 1 11/16" memory CBL tool. Successfully made it passed hang up depth of 403', Max tool OD 2.75", more flexible tool string. Log from surface to 1982' MD WLM. POOH and re -log from surface to 600' MD WLM, re -log trouble area. NOTE: Caliper log indicated damage in joints 9 and 10, 49.7% and 100% damage respectively (397'). Joint 10 appears to have a split in casing. Minimum ID recorded for 7" is 5.59". Remainder of casing in very good condition with less than 20% damage. 1/20/2019 1/20/2019 3.00 COMPZN RPCOMP WAIT P Wait on SLB 1 11/16" Memory CBL 10:00 13:00 tools and Baker inflatable bridge plugs to arrive on location. 1/20/2019 1/20/2019 10.00 COMPZN RPCOMP ELNE P M/U SLB CBL and RIH t/ 1984' and 13:00 23:00 log F/ 1984' to surface RID CBL and M/U Baker inflatable RBP RIH U 1974' and set RPB rQ 1974' POOH RID Pollard E -line 1202019 1/21/2019 1.00 COMPZN RPCOMP PRTS P R/U and Test 7" casing and RBP t/ 23:00 00:00 1 1 12000 psi All good 1/21/2019 1/21/2019 2.00 COMPZN RPCOMP SHAH P M/U Baker mule shoe guide on 3 1/2" 00:00 02:00 HT- 38 and P/U singles out of pipe shed Tag up 385' No go with 5.0 OD P/U 10' 1/21/2019 1/21/2019 2.50 COMPZN RPCOMP OTHR P R/U and Dump Sand in 31/2"" HT -38 02:00 04:30 100' on Top of RBP @ 1974' POOH and stand back 3 1/2"" DP Page 4138 Report Printed: 2/21/2019 Aap6_ Operations Summary (with Timelog Depths) + zj; ML 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Time End Time Wr(hd Phase Op Cede Acsaty Code Time P -T -X Operation Stan Depth (ftKB) End Depth(ftKB) 1/21/2019 1/21/2019 5.00 COMPZN RPCOMP BHAH P Prep to M/U Baker mechanical Cutter 04:30 09:30 BHA and P/U 2 7/8"" Pac HT DP Attempt RIH with Baker Hughes 4 1/2" mechanical cutler. Tagging up at 395'. Attempt several times to work through spot but unable to. Lay down 4 1/2" cutter and 13 stands of 2 7/8" work string. Pick up 3 3/4" mechanical cutter and 2 7/8" work string. Unable to get past hang up depth of 395'. Lay out 3 3/4" cutter and 2 7/8" work string. 1/21/2019 1/21/2019 9.00 COMPZN RPCOMP BHAH P Pick up Baker Hughes Swedge BHA 09:30 18:30 assembly as follows: Swedge, Bit Sub, Bumper Sub, Oil Jars, 12- 4 3/4" drill collars and crossover. Attempt to enlarge 7" casing ID large enough to pass 3 3/4" mechanical cutter past hang up depth of 395'. Unable to make enlarge 7" casing ID. Lay down Swedging assembly. 1/21/2019 1/22/2019 5.50 COMPZN RPCOMP SHAH P Pick up Baker Hughes milling 18:30 0000 assembly to enlarge 7" casing ID. RIH and mill out buckled casing at 390'. Mill V 399' 1/22/2019 1/22/2019 1.00 COMPZN RPCOMP MILL P Continue milling out buckled casing at 00:00 01:00 390', Mill V 399' no down movement observed. During milling operations observed diesel returns to surface. During milling operations milled through 7" casing. 1/22/2019 1/2212019 1.00 COMPZN RPCOMP TRIP P POOH and check mill. When on 01:00 02:00 surface observed the mill had twisted off at the top of the fishing neck. Bull nose and 5 3/4" watermelon mill left in hole, approximately 4.75' of fish in hole. 1/22/2019 1/22/2019 1.00 COMPZN RPCOMP BHAH T M/U BHA# 8 w/ Baker O/S 5 3/4" w/ 02:00 03:00 31/2"grapple 1/22/2019 1/22/2019 11.00 COMPZN RPCOMP CIRC P R/U to O.A to Bleed Tank and test 03:00 14:00 lines to 2000 psi and pump 9.3 ppg KWF down 7" casing with blinds shut via kill line taking returns up the OA to flowback tank. Observed gas and diesel back to flowback tank. Well out of balance, well u -tubing. Pumped approximately 200 bbls of 9.3 ppg to displace/swap well from arctic pack/diesel. Allow well to u -tube to equalize, bleeding off gas to bleed trailer. Shut OA in 5 times and each cycle pressure built up between 40-60 psi. Bleed well off to bleed back tank from 50 psi to 10 psi. 1/22/2019 1/22/2019 0.50 COMPZN RPCOMP SFTY P Safety stand down with all crew 14:00 14:30 members and 3rd party service providers on location. Discussed January Incident Review and Learning Opportunities Presentation. Page 5138 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation stadoepth (fil(e) End Depth (W) 1/22/2019 1/22/2019 4.50 COMPZN RPCOMP OWFF P Continue to bleed OA to bleed off 14:30 19:00 tank. Bleed well off completely to 0 psi. Observe well for 30 mins. No pressure or visual flow observed. Open blind rams and observe diesel in 7" casing and pressure build up to 45 psi on OA. Shut blind rams and pump 20 bbls of 9.3 ppg KWF down 7" casing up the OA to flowback tank. No pressure or flow observed. Monitor well. 1/22/2019 1/23/2019 5.00 COMPZN RPCOMP OWFF P Monitor well, open up. Decision was 19:00 00:00 made to test blind rams, AOGCC was notified. PU 7" retrievable test packer. RIH, set at 99'. POOH. Shut blind rams, test 7", and blinds to 250psi low and 2500psi high, 5min each, charted. Open blinds, RIH, release packer, allow to relax. POOH, LD packer. 1/23/2019 1/23/2019 7.00 COMPZN RPCOMP FISH T MU 5 3/4" overshot, RIH, tag fish at 00:00 07:00 395', had good indication it tagged, engaged, some over pull. Slack Off several limes, tag each time. POOH, no fish. Marks on outside of overshot, no indication fish was swallowed. MU smaller overshot 4 11/16", RIH, tag fish at 395' pumping and rotating set down 10K, PU 1 O over pull, pop free several times. POOH, no fish. Edge of overshot was rolled over and wom, no indication fish was swallowed. MU 5 5/8" BOT box tap, RIH. 1/23/2019 1/23/2019 2.00 COMPZN RPCOMP SHAH T Pick up 2 7/8" drill pipe and perform 07:00 09:00 drift run. Attempt to tag top of fish/verify fish depth. RIH and tag obstruction at 395' MD. Lay down 2 7/8" drill pipe. 1/23/2019 1/23/2019 4.50 COMPZN RPCOMP WAIT T Wait on Baker Hughes fishing tools 09:00 1330 (junk mill) and drill collars (3 1/8"). Clean rig and perform maintenance. 1/23/2019 1/23/2019 2.50 COMPZN RPCOMP BHAH T Prep 3 5/8" junk mill BHA. Pick up 13:30 16:00 Baker fishing assembly as follows: 3 5/8" junk mill, 12 -3 1/8" drill collars, and crossover. 1/23/2019 1/23/2019 1.00 COMPZN RPCOMP JAR T RIH with 3 5/8" junk mill assembly and 16:00 17:00 attempting to free fish. Continue working pipe stacking approximately 5 -8k WOB to fish at 395'MD. Successfully able to free fish from restricted spot at 395'. 1/23/2019 1/23/2019 0.50 COMPZN RPCOMP TRIP T RIH with 3 1/2" drill pipe, continuing to 17:00 17:30 push fish to bottom. Unable to pass 3 1/2" tool joint through restricted 7" casing ID at 395'. 1/23/2019 1/24/2019 6.50 COMPZN RPCOMP TRIP T POOH racking back 3 1/2" drill pipe in 17:30 00:00 derrick. Pick up 2 7/8" drill pipe singles, Passed through restriction, MU top drive and push three jts through until sufficient weight to fall through. Continue to push fish to top of sand at 1828'. Set down 10K to confirm bottom. 1/24/2019 1/24/2019 3.50 COMPZN RPCOMP TRIP T Monitor well. POOH LD 2 7/8" DP and 00:00 03:30 junk mill BHA. 1/24/2019 1/24/2019 2.00 COMPZN RPCOMP TRIP T MU 4 3/4" string mill BHA. RIH PU 2 03:30 0530 1 7/8" DP Page 6138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth start Tme End Time our (hr) Phase op Code ActivM Code Time P -T -X Operation dtKB) End Depth mKB) 1/24/2019 1/24/2019 0.50 COMPZN RPCOMP MILL T Make up stand of 3 1/2" drill pipe and 05:30 06:00 RIH. Tag 7" casing ID restriction at 396' MD. Establish milling parameters at 3 bpm, 780 psi SPP, 40 RPM, Off BTM TO 650 ftlbs, and On BTM TO 800 Ribs. 1/24/2019 1/2412019 0.50 COMPZN RPCOMP SVRG P Service top drive, grease top drive and 06:00 06:30 tighten black jack. 1/24/2019 1/24/2019 7.00 COMPZN RPCOMP MILL T Continue milling 7" casing restriction 06:30 13:30 from 396' to 400.5' MD. At 3bpm, 780 psi SPP, 40 RPM and torque ranging from 800 - 1400 ftlbs. Lightly feathering mill with 1-3 k lbs WOB. At approximately 400' MD torque became erratic. Decision made to POOH. 1/24/2019 1/24/2019 1.50 COMPZN RPCOMP TRIP T Decision made to POOH due to erratic 13:30 15:00 torque swings and not making any forward progress. POOH, laying down 3 1/2" drill collars and 2 7/8" drill pipe. Inspect mill. Milled showed wear on the ribs about 1/2 way. 1/24/2019 1/24/2019 1.50 COMPZN RPCOMP WAIT T Wait on string mill from Baker to be 15:00 16:30 built. 1/24/2019 1/2412019 1.00 COMPZN RPCOMP TRIP T PU 4 5/8" string mill with cutting 16:30 17:30 structure on full length of ribs, RIH PU DC/DP to 395ft. 1/24/2019 1/24/2019 3.00 COMPZN RPCOMP MILL T Establish milling pattern, 40RPM, 17:30 20:30 3bpm 780 SPP. Mill 7" casing restriction from 400.5' to 410' with torque ranging from 1000 to 1300 ftlbs. Lightly feathering mill with 1-3k lbs WOB. 1/24/2019 1/2412019 1.50 COMPZN RPCOMP REAM T Back ream and ream down 40RPM, 20:30 22:00 3bpm with torque ranging from 800- 130001bs. Work string mill up and down through restriction until torque normalizes. 1/24/2019 1/25/2019 2.00 COMPZN RPCOMP TRIP T RIH to 540'to drift for casing cutter. 22:00 00:00 Prep floor. POOH LD. 1/25/2019 1/25/2019 2.00 COMPZN RPCOMP TRIP P MU casing cutter BHA. RIH to cut 00:00 02:00 depth. 1/25/2019 1/25/2019 1.50 COMPZN RPCOMP CUTP P Wash down 5bpm to locate collar, PU 02:00 03:30 20' above collar to 419'. Cut casing 60rpm, 5bpm 1850psi SPP, 1080 ft Ib. OA 35 Psi. Not seeing expected drop in torque or pressure, SD pump, PU. Ease in hole pumping 5bpm to tag cut, saw dogs tag, Begin rotation again 60rpm. Irregular readings, torque not falling off, rotation noise sounds like cut is incomplete, decided to POOH and check cutter dogs. 1/25/2019 1/2512019 1.50 COMPZN RPCOMP TRIP P POOH to check cutter. Found one 03:30 05:00 cutter sheared off, approximately 1" x 1/2" piece of knife. Laydown BHA. 1/25/2019 1/2512019 1.00 COMPZN RPCOMP RURD P Rig up to circulate down 7" casing. 05:00 06:00 1/25/2019 1/25/2019 1.00 COMPZN RPCOMP PULD P Pick up 7" casing spear with one joint 06:00 07:00 of 3 1/2" drill pipe. Engage spear into 7" casing pull on 7" casing with 135k on weight indicator. Casing pulled free with approximately 90 k over pull. Page 7138 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth startrim End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (W) End Depth (W) 1/25/2019 1/25/2019 5.00 COMPZN RPCOMP CIRC P Circulate 50 bbls diesel at 140 deg F 07:00 12:00 down the 7" casing and taking returns up the OA to the flow back tank. Allow diesel to soak for 1 hour. Pump 140 deg 9.3 ppg brine at 1.5 bpm, displacing diesel out of the OA. Continue pumping until all diesel displaced and 9.3 ppg brine observed at surface. Allow well to balance. Observe well for 30 mins. No flow observed. 1/25/2019 1/25/2019 3.00 COMPZN RPCOMP NUND P Break 13 5/8" BOP stack on the 12:00 15:00 connection at the 13 518" DSA. Lift stack and secure. Remove 7" Casing slips. Lower stack back on to DSA and nipple back up. 1/25/2019 1/25/2019 0.50 COMPZN RPCOMP PULD P Lay down 7" casing, spear and 15:00 15:30 remove 7" casing packoff. 1/25/2019 1/25/2019 2.50 COMPZN RPCOMP PULD P POOH with 7" rasing from cut at 15:30 18:00 approximately 419' MD to surface. Strapping and tallying all 7" casing joints. Found last joint parted at the connection, recovered 367.89' of pipe (8 full joints) left in hole above cut 51.13'. 1/25/2019 1125/2019 1.50 COMPZN RPCOMP BOPE P Clear floor of 7" handling tools. PU 18:00 19:30 handling joint and test plug, set in wellhead. Test BOP/wellhead connection to 500psi for 5mmutes. Pull test plug. Run wear ring. 1/25/2019 1/25/2019 1.50 COMPZN RPCOMP BHAH P Clear floor, prepare to TIH, RU Wfd 19:30 21:00 tongs, move pipe in the pipe shed. Re -dress casing cutter tool. MU 3 3/4" casing cutter BHA. 1/25/2019 1/25/2019 1.00 COMPZN RPCOMP TRIP P TIH to cut depth, saw top of 7", fell 21:00 22:00 1 1 through. 1125/2019 1/25/2019 1.00 COMPZN RPCOMP CUTP P Bring rotary on, 60rpm, 900ftib torque, 22:00 23:00 bring pump on 500psi SPP 3bpm. Cut 7" casing at 424' torque ranging from 1100 to 1300ft1b, 60rpm, 4bpm, 1050psi SPP. After 31 min pump pressure fell off 100psi and torque fell off to 970ftlb. PU, SO pumping, confirmed cut by tagging stub with cutler. 1/25/2019 1/26/2019 1.00 COMPZN RPCOMP TRIP P POOH to BHA. 23:00 00:00 1/26/2019 1/26/2019 1.00 COMPZN RPCOMP BHAH P LD cutter BHA. Knives show good 00:00 01:00 indication of a cut. 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP SVRG P Rig maint. Grease top drive. 01:00 01:30 1/26/2019 1/26/2019 2.00 COMPZN RPCOMP BHAH P PU spear BHA 01:30 03:30 1/26/2019 1/26/2019 2.50 COMPZN RPCOMP TRIP P TIH w/ spear, tagged up at 363', 03:30 06:00 worked pipe to 368', restriction in 9 5/8" preventing spear from reaching top of 7" fish. POOH. Found sign of wear on 6-3/4" stop ring. Lay down 7" spear. 1/26/2019 1/26/2019 2.50 COMPZN RPCOMP BHAH P Pick up 7 1/4" string mill. RIH with mill 06:00 08:30 to drift well 9 5/8" casing. Tagged up at 396' md, TOF. 1/26/2019 1/26/2019 1.00 COMPZN RPCOMP TRIP P POOH and lay down string mill. 08:30 09:30 Page 8138 ReportPrinted: 2/2112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Time End Time Dur hr) Phase Op Code ActiOy Corte Time P -T -X Operation Start Depth (ftKB) End Depth(%KB) 1/26/2019 1/26/2019 1.00 COMPZN RPCOMP BHAH P Pick up 8 1/2" string mill. 09:30 10:30 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP TRIP P RIH and tag up at 353' md. Establish 10:30 1100 milling parameters at 5 bpm, 40 psi SPP, 60 RPM, and 900 ftlbs off bottom torque. 1/26/2019 1/26/2019 2.00 COMPZN RPCOMP 7T -HR P Due to pump pressure being 40 psi at 11:00 1300 5 bpm, troubleshoot SPP No indication on surface of any issues with mud pumps. POOH to inspect tools. No issue with tools at surface. Pump through BHA at surface and no issues observed. 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP TRIP P Run back in hole with 8 1/2" mill. 13:00 13:30 1/26/2019 1/26/2019 3.00 COMPZN RPCOMP MILL P Begin milling operations at 353' md. 13:30 1630 Up and down weight 37k. Establish milling parameters at: 4 bpm, 50 psi SPP, 60 RPM, 900 ftlbs off bottom torque, and 3500 ftlbs on bottom torque. Mill from 350' and to 353.5'md. Stall with tQ set at 12K. Attempt to PU, mill stuck, jar mill free at 100k up wt. Mill free. 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP TRIP P POOH 16:30 1700 1/26/2019 1/26/2019 2.00 COMPZN RPCOMP BHAH P LD BHA. BHA showed signs of 17:00 19:00 rubbing in several locations. MU BOT 7 1/4" string mill BHA. 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP TRIP P TIH, to 348'md. RIH, watching for 19:00 19:30 restriction. Set down 5K at 354'md. 1/26/2019 1/26/2019 1.00 COMPZN RPCOMP MILL P PU to 348', bring pumps on 6bpm, 19:30 20:30 178psi SPP, 77rpm 1000ftib. Erratic DP movement, wobble. Mill down to 361' pumping 6bpm, 78 rpm with torque ranging 1100-1300ftib, spiking to 2500ft1b. Monitor shakers for sand, returns for losses. RIH tag up at 395'. SD rotary, drift 9 5/8" pumping 6bpm past restriction three times with only slight bobbles on weight indicator. 1/26/2019 1/26/2019 0.50 COMPZN RPCOMP TRIP P POOH 71/4" mill. 20:30 2100 1/26/2019 1/27/2019 3.00 COMPZN RPCOMP BHAH P LD 7 1/4" mill. Found mill to have 21:00 00:00 broken cutters and wear on the leading and tail edge of the full OD gauge. PU 8 3/8" string mill BHA. 1/27/2019 1/27/2019 1.00 COMPZN RPCOMP TRIP P TIH with caution, looking for 00:00 01:00 restriction, stack out 10K at 356.4'md. 1/27/2019 1/27/2019 3.50 COMPZN RPCOMP MILL P PU to 345', bring pumps on at 6bpm, 01:00 04:30 89psi SPP, 75rpm 1700ftlb with extreme wobble and chatter. Mill down steadily, wobble stopped when bumper sub closed. Mill to 370ft, torque ranging from 1000 to 7000ft1b. Torque fell off. Drift in hole to TOE at 395'. Backream and work pipe through 325' to 360' with minimal torque, 33008 b at 361.6' to 367'. Mill down to 379', SD rotary, drift up and down pumping. No losses. 1/27/2019 1/27/2019 0.50 COMPZN RPCOMP TRIP P POOH. 04:30 0500 I Page 9/38 ReportPrinted: 2121/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Stan Time End rime Dur(no Phase Op Code Activity Code Time P -T -X Operation (KKB) BW Depth(MKB) 1/27/2019 1/27/2019 2.00 COMPZN RPCOMP BHAH P LD stinger, reconfigure 8 3/8" mill BHA 05:00 07:00 to get mill down to TOF. 1/27/2019 1/27/2019 0.60 COMPZN RPCOMP TRIP P TIH with 8 3/8" string mill. 07:00 07:30 1/27/2019 1/27/2019 0.50 COMPZN RPCOMP CIRC P Pump 20 bbls of Hi -Vs sweep. 07:30 08:00 Circulate sweep out of hole. Trace of sand and metal. 1/27/2019 1/27/2019 1.00 COMPZN RPCOMP TRIP P POOH with 8 3/8" string mill. Lay 08:00 09:00 down string mill. 1/27/2019 1/27/2019 1.50 COMPZN RPCOMP BHAH P Pick up 7" casing spear with 6.220" 09:00 10:30 grapple. 1/27/2019 1/27/2019 3.00 COMPZN RPCOMP FISH P RIH and engage 7" spear in to casing 10:30 13:30 stub at 395'. Stack approximately 15- 20 k weight to ensure 7" spear fully swallowed and engaged. Pull approximately 100 k over, appear to have 7" casing fish. POOH to surface, at surface observed no fish. Signs of scarring and markings on spear giving indication 7" spear had engaged in casing stub. Re -dress spear with new 6.220" grapple and RIH with the same. 1/27/2019 1/27/2019 1.50 COMPZN RPCOMP FISH P RIH, tagged casing stub high at 393' 13:30 15:00 md. Pulled casing up hole on previous run approximately 2' before spear disengaged. Stack approximately 15-20k weight to ensure 7" spear fully swallowed and engaged. Unable to enter top of fish at 393' and with spear. Several attempts made unsuccessfuly. Potential obstruction hindering spear from entering top of fish. 1/27/2019 1/27/2019 1.00 COMPZN RPCOMP TRIP P POOH with 7" spear and lay down the 15:00 16:00 same. 1/27/2019 1/27/2019 2.50 COMPZN RPCOMP BHAH P PU 6 1/8" string mill with 2 7/8" stinger 16:00 18:30 BHA. Clean and clear floor. 1/27/2019 1/27/2019 1.00 COMPZN RPCOMP MILL P TIH w/ string mill 1/335'. Stack wt at 18:30 19:30 401', fell through. RIH w/ 5k drag, set down 1 Ok at 420' md. Attempt to work past first casing cut. PU above fish to 380' with 5k drag, Creep in hole pumping 4bpm, 80psi SPP, rotating 20rpm 850ftlb, reaming down. Stack weight at 420'md repeatedly, unable to get stinger past original casing cut. 1/27/2019 1.00 COMPZN RPCOMP BHAH P POOH, LD stinger. MU 6 1/8" string 19:30 20:30 mill BHA. RIH f/ 301' to 392' pumping 11127/2019 3bpm, 44psi SPP. Tag TOF at 392'md, stack 8K. 1/27/2019 1/27/2019 2.50 COMPZN RPCOMP MILL P Attempt to enter fish unsuccessful. 20:30 23:00 PU to 380' and rotate 40rpm, 600ftlb. Ream in hole with 5K drag, entered fish, torque spiked to 4500ftib at 395', set down 15K. PU to check if dragging fish, popped free. Dry tag fish. RIH pumping 3bpm 40psi SPP, 50rpm 600ftlb, torque increased to 3000ft1b at 395'md/ Mill for 10min. POOH to inspect BHA. Page 10/38 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Time End Time Our (hr) Phase Op Code Aamiy code Time P -T -X OpenOw start Depth (M(B) End DepN (WB) 1/27/2019 1/28/2019 1.00 COMPZN RPCOMP BHAH P POOH LD string mill, Deep groove in 23:00 00:00 4 3/4" bull nose and immediately below the cutting structure on the leading edge of the string mill (little wear on actual cutting structure) indicate TOF is folded over. 1/28/2019 1/28/2019 1.50 COMPZN RPCOMP BHAH P PU taper mill BHA. 00:00 01:30 1/28/2019 1/28/2019 3.00 COMPZN RPCOMP MILL P RIH f/ 335'tag up at 393'. PU above 01:30 04:30 fish, RIH pumping 6.5bpm, 180psi, rotating 60rpm 560ftlb ream down to top of fish. Torque increased to 1000ftlb at 392.7' ream down with 80rpm and torque ranging 1000- 3000ftlb, work mill to 395.86. PU check free. Continue to mill stacking weight with no increase in torque or depth. POOH to check BHA. Found cutting structure on nose of tapered mill gone, wear on nose. 1/28/2019 1/28/2019 2.00 COMPZN RPCOMP SHAH P PU spear 6.47" grapple BHA. 04:30 06:30 1/28/2019 1/28/2019 1.50 COMPZN RPCOMP FISH P RIH with 7" spear tag top of fish at 06:30 08:00 394' and engage spear at 396'. Pick up to 1251k fish came free. 112812019 1/28/2019 1.00 COMPZN RPCOMP PULD P POOH and lay down fish and spear. 08:00 09:00 Recovered approximately 24' of 7" casing fish. There was no internal scaring in the 7" casing from initial cut attempt at 419', which would have indicated that we pulled from the second cut at 424' md. therefore leaving approximately 5' of casing left in hole. 1/28/2019 1/28/2019 3.50 COMPZN RPCOMP SHAH P Pick up 7" spear with 6.220" grapple. 09:00 12:30 RIH in an attempt to fish the remaining 5' of 7" casing fish. Estimated top of fish at 418', unable to tag fish. Tagged at 397' indicating 9 5/8" casing impingement. POOH and lay down spear assembly. 1/28/2019 1/28/2019 1.50 COMPZN RPCOMP BHAH P Pick up bull nose, 7 1/4" string mill, 12:30 14:00 bumper sub, oil jars, and 9- 4 3/4" drill collars. Attempt to mill out and drift 9 5/8" casing to the top of the 7" casing fish at 418'. Milling parameters: 60 RPM, 1400K filbs, 7 bpm and 250 psi SPP. 1/28/2019 1/28/2019 3.50 COMPZN RPCOMP MILL P TIH f/302'tag up at 395'md. Attempt 14:00 17:30 to mill out and drift 9 5/8" casing to the top of the 7" casing fish at 418'. Milling parameters: 60 RPM, 1400 nibs, 7 bpm and 250 psi SPP. Make steady progress 24k WOB. Mill to 401.41, at which time torque dropped off, and RPM increased, twisted off BHA. POOH to inspect BHA. 1/28/2019 1/28/2019 1.50 COMPZN RPCOMP BHAH T POOH, stand back BHA. Found 17:30 19:00 bumper sub parted near service connection (Still in hole bullnose, 7 1/4" string mill and remainder of bumper sub, 9.13' OAL). 3.29' of 4 3/4" slick looking up. Order tools from Baker Fishing shop. Page 11/38 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) a r 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Oepth Sten Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (RKB) End Depth(RKB) 1/28/2019 1/28/2019 2.50 COMPZN RPCOMP WAIT T Wait on fishing tools to recover fish. 19:00 21:30 1/28/2019 1/28/2019 0.50 COMPZN RPCOMP SFTY T Safety Stand Up with Brandon's crew. 21:30 22:00 Review January incidents. 1/28/2019 1/29/2019 2.00 COMPZN RPCOMP WAIT T Wait on fishing tools to recover fish. 22:00 00:00 1/29/2019 1/29/2019 3.50 COMPZN RPCOMP WAIT T Clean and organize rig, perform PM's, 00:00 03:30 install gunline in mud pits, service tong sheaves, and prepare for picking up BHA #34 while waiting on fishing tools/overshot assembly. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP BHAH T P/U and M/U and RIH with BHA#34 03:30 04:30 overshot fishing assembly. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP FISH T Attempt to engage fish at 390' with 04:30 05:30 rotary stalling out. 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP BHAH T Lay down BHA#34 overshot assembly 05:30 06:00 and inspect overshot. 1/29/2019 1/29/2019 1.50 COMPZN RPCOMP BHAH T P/U and M/U BHA#35 overshot 06:00 07:30 assembly and RIH to 390' and attempt to engage fish with 43k rotating weight with 30 rpm at 650 ft/lb torque and 4bpm at 71 psi down to 392.58' with TDS stalling out. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP TRIP T POOH to lay down overshot assembly. 07:30 08:30 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP BHAH T B/D and lay down overshot assembly 08:30 09:00 #35 and inspect overshot, lip guide bent inward with visible markings on inner ID. 1/29/2019 1/29/2019 2.50 COMPZN RPCOMP WAIT T Continue rig PM's while waiting on 09:00 11:30 overshot with carbide ring over mill guide control in overshot. 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP SHAH T P/U and M/U BHA#36 overshot 11:30 12:00 1 1 assembly and RIH 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA#36 to 390'to attempt to 12:00 12:30 engage fish. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP FISH T Attempt to engage fish from 390' with 12:30 13:30 43k rotating weight with 30 rpm at 650 1t/Ib torque and 4bpm at 71 psi down to 392.58' with TDS stalling out. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP TRIP T POOH with BHA #36 13:30 14:30 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP SHAH T B/D and lay down overshot assembly 14:30 15:00 #36 and inspect overshot, lip guide bent inward with visible markings on inner ID. Fish never engaged up in overshot to carbide ring. 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP BHAH T P/U and MIN BHA#37 polish mill 15:00 15:30 assembly and RIH 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#37 to 390'to attempt to 15:30 16:30 engage fish. 1/29/2019 1/29/2019 1.50 COMPZN RPCOMP MILL T Mill with polish mill, check parameters 16:30 18:00 at 390' with 43k rotating weight with 30 rpm at 650 ft/Ib torque to 750 ft/Ib torque and 4bpm at 71 psi down to 392.46' and mill for 1 foot down to 393.46'. Metal over shakers showing signs of cutting 9-5/8" casing in small hair like slivers. Page 12138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Start Time End Time our (hu Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth(ftKe) 1/29/2019 1/29/2019 2.50 COMPZN RPCOMP MILL T Continue to mill with polish mill, check 18:00 20:30 parameters at 393.46' with 43k rotating weight with 30 rpm at 650 ft/lb torque to 750 ft/lb torque and 4bpm at 71 psi down to 394.16' and mill for total of 1.7 foot down over fish. Metal over shakers showing signs of cutting 9-5/8" casing in small hair like slivers. Started seeing occasional torque spikes as high as 1000ft1b, progress slowed. Notified State of upcoming BOPE test 19:45hrs. 1/29/2019 1/29/2019 1.00 COMPZN RPCOMP SHAH T POOH to check BHA. Found 20:30 21:30 indication of something was up inside of polish mill, wear on ID (measured the first 1.6' up inside) and cutting structure of nose. Found portion of bumper sub paint gone indicating contact. PU and MU overshot with 4 3/4"grapple, 1.8ft swallow BHA #38 1/29/2019 1/29/2019 1.50 COMPZN RPCOMP FISH T Trip in hole f/298' to 389'md, check 21:30 23:00 parameters 4bpm, 60psi, tOrpm 400ftlb torque. RIH, tag up at 394.25', set down 10k, no bobble getting over fish, depth indicates overshot swallowed polished fish. POOH to inspect, no overpull. No fish. Found drag mark on overshot and top of grapple tip broke off. 1/29/2019 1/29/2019 0.50 COMPZN RPCOMP BHAH T Break off overshot/grapple. M/U 5 2300 2330 7/8" short catch overshot with 4 3/4" grapple, the objective being to determine if fishing BHA is getting over the fish or running beside it. 1/29/2019 1/30/2019 0.50 COMPZN RPCOMP FISH T TIH f/ 298'tag up at 393.63' twice 23:30 00:00 (TOF 392.55'), PU no overpull. RIH, set down at 392.55' 10K twice, work pipe over fish to 393.57' set down 8K. PU, no overpull. Attempt to engage fish. 1/30/2019 1/30/2019 1.00 COMPZN RPCOMP BHAH T B/D and lay out BHA#39 overshot w/ 0.0 0.0 0000 01:00 grapple fishing assembly and inspect, observed no signs of fish engagement. 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP WWWH T P/U and M/U string magnet and 0.0 01:00 0230 Johnny Wacker and flush BOP stack, collect 3lbs of metal shaving out of ram cavities, lay out assembly 1/30/2019 1/30/2019 1.00 COMPZN RPCOMP BHAH T P/U and M/U BHA #40 and rig up 0.0 0230 03:30 Weatherford power tongs and M/U 2- 7/8" Hpac DP. 1/30/2019 1/30/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA #40 to 393' and tag up 0.0 03:30 04:00 with several attempts at measured depth of 392.7'. POOH. 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP BHAH T B/D and lay out BHA #40 and rid down 0.0 0400 0530 Weatherford tongs. 1/30/2019 1/30/2019 4.50 COMPZN RPCOMP SVRG T Service rig, work on spinners, and 0.0 0530 10:00 perform PM's while waiting on clean and filtered 9.3 ppg brine for down hole camera operations. 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP BHAH T P/U and M/U BHA #41 with overshot 10:00 11:30 1 1 1 1 1 1 for camera guide shoe. Page 13/38 Report Printed: 2/2112019 a Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Start Time End Time Our (hr) Phase Op Cade ACBvity Code Time P -T -X Operation (flKB) EM Depth (flKB) 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP TRIP T RIH with BHA #41 to 392.85'. RU circ 11:30 13:00 equipment. 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP ELNE T Spot and R/U Alaska E -Line and hang 13:00 14:30 sheave in elevators on TDS and prepare to pick up down hole camera. 1/30/2019 1/30/2019 1.50 COMPZN RPCOMP CIRC T Pump 20 bbl high vis pill at 391.85' 0.0 14:30 16:00 and chase with 65 bbls 9.3ppg brine, returns clean and clear brine water for down hole camera. 1/3012019 1/30/2019 3.00 COMPZN RPCOMP ELNE T R/U EV down hole camera on E -Line 16:00 19:00 and RIH to 392' 1/30/2019 1/30/2019 3.50 COMPZN RPCOMP CIRC T MU pump in in sub, RU Little Red to 19:00 22:30 pump 50bbl and displace well to 140deg F healed diesel. Move pipe up and down to flush the top of fish. Allow to soak 30min. Reverse circ with 45bbi filtered brine. 1/30/2019 1/31/2019 1.50 COMPZN RPCOMP ELOG T R/U EV down hole camera on E -Line 22:30 00:00 and RIH to 392'. Poor visibility, motor slow. POOH change out motor, reconfigure tool string. 1/31/2019 1/31/2019 2.50 COMPZN RPCOMP ELOG T RU aline RIH to top of fish, pump 0.0 0.0 00:00 02:30 varying rate with fresh, utility water, until visiblity improved. RIH past top of fish to view sideview camera. 1/31/2019 1/31/2019 1.00 COMPZN RPCOMP ELOG T RD Eline. Review data, screenshots 0.0 0.0 02:30 03:30 and video snippets. Transfer files. 1/31/2019 1/31/2019 0.50 COMPZN RPCOMP CIRC T Circulate 9.3ppg brine 5bpm, 200psi, 0.0 0.0 03:30 04:00 displace FW. R/D blow down lines. C/O handling equipment. 1/31/2019 1/31/2019 0.50 COMPZN RPCOMP TRIP T POOH standing back, LD overshot. 0.0 0.0 04:00 04:30 1 1/3112019 1/31/2019 1.00 COMPZN RPCOMP CLEN P Pull wear ring. Jet the stack. 10bpm, 0.0 0.0 04:30 05:30 rotate and flush clean. 1/3112019 1/31/2019 3.00 COMPZN RPCOMP BOPE P PU test joints, 2-7/8" - 7" - 3-1/2" and 0.0 0.0 05:30 08:30 check space out depths for donut bottoms of test joints. Prepare to pressure test BOPE. Pressure test witness waived by Matt Herrara with AOGCC via email and phone. 1/31/2019 1/31/2019 6.50 COMPZN RPCOMP PRTS P Pressure test BOPE, 250 psi low 5 0.0 0.0 08:30 15:00 minutes / 2,500 psi high 5 minutes on 2-7/8" test joint on annular and UVBR, 7" test joint on LPR and annular, 3- 1/2" on UPR, choke manifold and FOSVs. Perform gas alarm tests and Koomey draw down test. All tests good. 1/31/2019 1/31/2019 1.50 COMPZN RPCOMP RURD P Lay down test tool and clear and clean 0.0 0.0 15:00 16:30 rig floor, Make up landing joint and pull test plug, turn landing joint and test plug and RIH and land wear bushing and run in one lock down screw. Lay out landing joint. 1/31/2019 1/31/2019 2.50 COMPZN RPCOMP WAIT T Wait on fishing tools. 0.0 0.0 16:30 19:00 1/31/2019 1131/2019 1.50 COMPZN RPCOMP BHAH T M/U spear with 3.203" grapple on bent 0.0 0.0 19:00 20:30 1 1 1 Isub BHA. 1/31/2019 1/31/2019 0.50 COMPZN RPCOMP CIRC T RIH f/ 3outt, to top of fish, pump 1Obbll 0.0 0.0 20:30 21:00 1 High vis. sweep, recover fair amount of metal shavings on magnets. Page 14/38 ReportPrinted: 2/2112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Start Tim End Tim our (hr) Phase Op cotle Activity Code Time P -T -X Operation (NCB) End Depth (NCB) 1/31/2019 1/31/2019 0.50 COMPZN RPCOMP FISH T RIH pumping ibpm, 260psi, 44k hkld 0.0 0.0 21:00 21:30 to 393'md, past fish. PU 1/4 turn to left RIH saw pump pressure increase to 320 psi, 4k drag, set down 10K at 392', top of fish. Tum 1/4 tum and run past fish in all other orientations, Reorient pipe RIH saw pump pressure increase to 295psi, set down wt. PU 5K overpull then fell off. 1/31/2019 1/3112019 1.50 COMPZN RPCOMP BHAH T POOH to inspect BHA. Found grapple 0.0 0.0 21:30 23:00 in released position, will re -run. PU reset grapple BHA. 1/31/2019 2/1/2019 1.00 COMPZN RPCOMP CIRC T RIH f/ 300ft to top offish, pump ibpm 0.0 0.0 23:00 00:00 280psi,44k string wt. Attempt to engage fish. 2/1/2019 2/112019 0.50 COMPZN RPCOMP FISH T Attempt to spear fish. Pumping ibpm 0.0 0.0 00:00 00:30 280psi, set down 10K at 394', PU rotate 1/8 turn, RIH past to 397', PU rotate 1/8 turn tagged top offish at 391', pump pressure increase, rotate in, set down at 394ft. POOH to inspect BHA. 211/2019 2/1/2019 2.00 COMPZN RPCOMP BHAH T POOH standing back DC. Found 0.0 0.0 00:30 02:30 circle on nose of grapple, indicating set down on ID of FISH. Grapple released, dings indicated tag up. Unable to engage fish with spear. PU 6 3/8" overshot with 4" grapple BHA. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP FISH T RIH f/ 298ft pumping 30psi at 2.5bpm, 0.0 0.0 02:30 03:30 string wt 44k. Set down at 392' 10K work pipe down over fish to 394', at down 15k, PU 51k overpull, popped off. POOH to inspect BHA. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP BHAH T Found opposing scarring on first few 0.0 0.0 03:30 04:30 teeth of grapple. PU 5 3/4" overshot with 3in grapple. 2/1/2019 2/1/2019 0.50 COMPZN RPCOMP FISH T RIH f/ 29811 purring 3bpm, 44psi, 44k. 0.0 0.0 04:30 05:00 Set down IOK at 392ft. Work pipe over fish, set down 12K. PU overpull, allow jars to bleed open. PU 40K overpull, chained it down, PU 60K overpull, chained it down, showing some sign of upward movement. PU, popped free at 80K overpull. POOH to inspect. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP BHAH T Entire 7-1/4" mill fish BHA recovered, 0.0 0.0 05:00 06:00 1 lay out BHA #45. 2/1/2019 2/1/2019 2.50 COMPZN RPCOMP BHAH T Clean and clear rig floor, break down 0.0 0.0 06:00 08:30 Spear Assembly and clean up fishing tools on dg Floor and lay out to pipe shed for back haul. Prepare to pick up 8-1/2" string mill assembly BHA #46. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP BHAH T P/U and M/U BHA #46 string mill 0.0 0.0 08:30 09:30 assembly with 8-1/2" rough OD. 2/1/2019 2/112019 0.50 COMPZN RPCOMP TRIP T RIH with BHA #46 to 362' and observe 0.0 0.0 09:30 10:00 2k bobble, pick up and break circulation to begin milling/washing in hole. Page 16138 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log start Depth Start Time End Time Dur (hr) Phase Op Code Activity Cone Time P -T -X Dpemon (ftKB) End Depth (flKB) 2/1/2019 2/1/2019 4.00 COMPZN RPCOMP MILL T Reaming/Milling/Washing down from 0.0 0.0 10:00 14:00 362' to 392' with 8-1/2" mill assembly on 3-1/2" DP with 10 bpm, 180 psi, 60 rpm at 1100 to 2100 ft/lbs torque. Up weight at 43k and down weight 43k. Pumping 10 bbl Hi -Vis sweeps as needed, small metal shaving on ditch magnets, no abnormal metal shaving at shakers. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP TRIP T POOH with BHA #46 to surface. 0.0 0.0 14:00 15:00 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP BHAH T Inspect 8-1/2" string mill on surface, 0.0 0.0 15:00 16:00 good. Pick up stand of 6-1/4" drill collar and RIH with 8-1/2" string mill on stiffer assembly BHA #47. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA #47 to 362' with no tag 0.0 0.0 16:00 17:00 up's. 2/1/2019 2/1/2019 2.00 COMPZN RPCOMP MILL T Reaming/Milling/Washing down from 0.0 0.0 17:00 19:00 362' to 392' with 8-1/2" mill assembly on stand of 8-1/4" DC with 10 bpm, 180 psi, 60 rpm at 1100 to 2100 ft/lbs torque. Up weight at 43k and down weight 43k. Pumping 10 bbl Hi -Vis sweeps as needed, small metal shaving on ditch magnets, no abnormal metal shaving at shakers. 2/1/2019 2/1/2019 0.50 COMPZN RPCOMP TRIP T POOH with BHA 947 to surface. 0.0 0.0 19:00 19:30 2/1/2019 2/1/2019 0.50 COMPZN RPCOMP SFTY P Safety Stand Up with Ralph's crew. 0.0 0.0 19:30 20:00 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP BHAH T Inspect 8-1/2" string mill on surface, 0.0 0.0 20:00 21:00 good, lay down mill. Rack back stand of 6-1/4" drill collar and RIH with 8" string mill on 3 12" DP BHA #48. 2/1/2019 2/1/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA #48 to 388' with no tag 0.0 0.0 21:00 22:00 up's, establish off bottom parameters 10bpm, 150psi, 60 rpm 970ftib. RIH, torque increased at 3951 to 1200ft1b. 2/1/2019 2/1/2019 1.50 COMPZN RPCOMP MILL T Reaming/MillingNVashing down from 0.0 0.0 22:00 23:30 395' to 397.3' with 8" mill assembly on stands of 3-1/2" DP with 10 bpm, 150 psi, 60 rpm at 1100 to 2900 ft/lbs torque. Up weight at 43k and down weight 43k. Pumping 10 bbl Hi -Vis sweeps as needed, small metal shaving on ditch magnets, no abnormal metal shaving at shakers, possible chips of cement on shakers. PU, no overpull, drift in hole pumping to 397' with some bobbles. PU to 389' ream in hole, torque increased from 750 to 2500ftlbs at 397.3'. after 15min no progress torque not dropping off, POOH to inspect mill. 2/1/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T Prepare, POOH w/ mill BHA #48 0.0 0.0 23:30 00:00 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T TOOH, found mill in good condition, 0.0 0.0 00:00 00:30 1 some wear on XO sub. Will re -run. Page 16/38 Report Printed: 2121/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Sten Depth Start Time End Time our (hr) phase Op Code A Viry Code Time P -T -X Operation (flK0) End Depth (flK0) 212/2019 2/2/2019 2.00 COMPZN RPCOMP MILL T TIH to 397', set down 5K. PU to 392', 0.0 0.0 00:30 02:30 establish parameters; 460psi at 11 bpm, 880ftlb at 60rpm. Wash/Ream/Mill down to 397', 2500- 4300ftlb, 3-5k WOB to 401.1', torque erratic. PU to 387', wash/ream back to 401.1. Mill 1700ftlb at 65rpm, 2-5k WOB 10minutes then torque not falling off. Saw some cement or rock come over shakers. PU to 385', wash down to 396', stack 5k. POOH to inspect BHA. 2/2/2019 21212019 1.00 COMPZN RPCOMP TRIP T POOH. Found 8" string mill worn at a 0.0 0.0 02:30 03:30 sharp angle on leading edge, a groove on the bull nose and the joint of 3-1/2" DP above the mill shiny from contact. 2/212019 212/2019 0.50 COMPZN RPCOMP SHAH T Lay out and flag bad joint of 3 1/2" DP. 0.0 0.0 03:30 04:00 PU 9ft flex joint below the string mill to drift for a ledge. 2/2/2019 212/2019 0.50 COMPZN RPCOMP MILL T RIH, set down 8K at 397'. PU to 386' 0.0 0.0 04:00 04:30 600ft1b at 27rpm, 145psi at 10bpm. Ream/wash down, torque 3000ftlb at 397'. Pull up above, stop rotating, wash down, set down 10k at 397'. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP CIRC T Pump a 10bbi sweep on bottom. 0.0 0.0 04:30 05:00 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T POOH to change BHA configuration. 0.0 0.0 05:00 05:30 2/2/2019 2/2/2019 1.00 COMPZN RPCOMP BHAH T 8" mill has flat wear on leading edge of 0.0 0.0 05:30 06:30 mill blades with work wear on 6-3/8" bull nose. Tools showed engagement of the mills on the first two bulges in the 9-5/8" casing at 392' and 394', the third bulge at 397' seems to be causing a side load geometry that effectively pinched the bull nose over to the side and allowed the mill to contact the last bulge at 397' where the mill could not get Weight On Bit. B/D and UD 8" string mill and P/U and M/U BHA#50, 8-1/4" shod stand off mill on bull nose assembly. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA #60 to 392'. 0.0 0.0 06:30 07:00 2/2/2019 2/2/2019 2.00 COMPZN RPCOMP MILL T M/U TDS at 392' establish 0.0 0.0 07:00 09:00 parameters; 460psi at 11 bpm, 880ftlb at 60rpm. Wash/Ream/Mill down to 397', 2500-4300ftib, 3-5k WOB to 401.1' with mill depth at 398', torque erratic and then smoothed off with 5k WOB following same pattern as previous mill run, mill to 402'. Prepare to POOH. 2/2/2019 2/212019 0.50 COMPZN RPCOMP TRIP T POOH with BHA #50 0.0 0.0 09:00 09:30 1 Page 17138 Report Printed: 2/2112 01 9 . Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Stan Time EM rime our (hr) Phase op Code Activity Code rime P -T -x operaEon (flea) End Depth (B)(a) 2/2/2019 2/2/2019 1.00 COMPZN RPCOMP BHAH T 8-1/4" mill shows sign of work, first 0.0 0.0 09:30 10:30 joint of 3-1/2" drill pipe has work marks on it that corresponds to 392' and another wear patters above mill at 394' and below the mill at bull nose at 399' reference, chalked up bottom of bull nose still has chalk markings. Break down BHA#50. PIU and M/U BHA#51, 8-1/2" mill in tandem with 8- 1/4" mill. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA#51 to 355' and start 0.0 0.0 10:30 11:00 taking slight weight, M/U TDS establish parameters; 460psi at 11 bpm, 880111b at 60rpm. 2/2/2019 2/2/2019 1.50 COMPZN RPCOMP MILL T Wash/Ream/Mill down to 392' with 0.0 0.0 11:00 12:30 only 1-2k WOB and 880 to 1200 ft/lbs through spot at 360' to 370' and smoothed out down to 392'. Mill/ReamNVash down from 392'to 401' at 2500-7300ftib, 3-5k WOB, observed decrease in torque to 3000 ft/lb and WOB go up to 5k with torque coming up to 6k fl/lb and leveling off, signs mills were hung on lip again. Prepare to POOH. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T POOH with BHA#51 0.0 0.0 12:30 13:00 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP BHAH T 8-1/4" short bottom mill shows signs of 0.0 0.0 13:00 13:30 work on main body OD of mill, B/D and UD BHA#51. P/U and M/U BHA #52 with 8-1/2" string mill on bull nose. 212/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA#52 to 392', no drag or 0.0 0.0 13:30 14:00 bobbles through 360'to 370'. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP MILL T M/U TDS, with starting parameters: 0.0 0.0 14:00 14:30 460psi at 11 bpm, 880ft1b at 60rpm, MIIVReamN/ash down from 392' to 401' at 2500-7300ftib, 3-5k WOB, observed decrease in torque to 3000 Witt and WOB at 5k, signs mills were hung on lip again. Prepare to POOH. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T POOH with BHA#52. 0.0 0.0 14:30 15:00 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD BHA#52 and PIU and 0.0 0.0 15:00 15:30 M/U BHA#53 with bull nose, 4-1/2" flex joint and 8" mill. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA #53 to 392'. 0.0 0.0 15:30 16:00 2/2/2019 2/2/2019 1.00 COMPZN RPCOMP MILL T M/U TDS, with starting parameters: 0.0 0.0 16:00 17:00 460psi at 11 bpm, 880ftlb at 60rpm, Mill/Ream/Wash down from 392' to 399' at 2500-7300ft1b, 3-5k WOB, observed decrease in torque to 3700 ft/1b and WOB at 5k, signs flex joint and bull plug were hung on lip again. Prepare to POOH. 2/2/2019 2/2/2019 1.00 COMPZN RPCOMP TRIP T POOH with BHA#54. Lay out mill and 0.0 0.0 17:00 18:00 re -run BHA. Page 18138 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Depm Start Time End Time Our (hr) Phase Op Code Activdy Code Time P -T -x Operation (ftKB) EM Depth (ftKB) 2/2/2019 2/2/2019 2.00 COMPZN RPCOMP TRIP T RIH to drift with 6 3/4" bullnose, flex 0.0 0.0 18:00 20:00 joint on 3 112" DP, set down at 399', rotated and fell through, set down at 404'. POOH. Lay out all BHA. RIH with 4 3/4" bullnose on 3 1/2" DP, set down at 399', rotated, fell through, continue in hole to 424' no need to go further. POOH. 2/2/2019 2/2/2019 0.50 COMPZN RPCOMP BHAH T Break off 4 3/4" bullnose. PU BHA 0.0 0.0 20:00 20:30 #56, 8 1/2" lower mill (cutting structure length is —1', tapers to 5 3/4" OD) and 5 1/2" OD muleshoe on DP. TIH, set down at 399', rotate and fall through. 2/2/2019 2/2/2019 2.50 COMPZN RPCOMP MILL T Continue in hole to 401.7', PU to 0.0 0.0 20:30 23:00 400.8', establish parameters 407gpm, 150psi, 1100ft Ib at 60rpm. Ream in hole, mill from 401.7 to 404' torque ranging 1400-2000ftib rpm 60-90. PU above, shutoff rotary and wash down without bobbles to 403.4'. 2/2/2019 2/3/2019 1.00 COMPZN RPCOMP TRIP T POOH to inspect BHA. PU 8" string 0.0 0.0 23:00 00:00 mill and 6 3/4" rounded bull nose on 3 1/2" DP, RIH. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP MILL T TIH down to 404' with no bobbles; PU 0.0 0.0 00:00 00:30 and establish parameters 630ftlb at 72rpm, 180 psi at 10bpm Mill/Ream/Wash down to 404' al 1700- 2500ftib, 3-5k WOB, observed torque leveling off, signs mills were hung on lip again. Prepare to POOH. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP TRIP T POOH to change BHA. LD 8" mill, PU 0.0 0.0 00:30 01:30 8 1/4" lower mill with muleshoe again. 2/3/2019 2/3/2019 1.50 COMPZN RPCOMP MILL T TIH down to 404' with slight bobbles 0.0 0.0 01:30 03:00 establish parameters 730ft1b at 60rpm, 170 psi at 10bpm Mill/Ream/Wash down to 406' at 1500-2500ftib, 2-4k WOB, observed high torque with little WOB. Prepare to POOH. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP TRIP T POOH to change BHA. LD 81/4" 0.0 0.0 03:00 04:00 lower mill, found tool joint showing signs of contact. PU 8 3/4" string mill and 6 3/8" rounded bull nose, BHA #59 TIH on 312" DP. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP TRIP T TIH with 6-3/4" mill down to 353', take 0.0 0.0 04:00 04:30 wt. 2/3/2019 2/3/2019 2.00 COMPZN RPCOMP MILL T P/U establish parameters 700ft1b at 0.0 0.0 04:30 06:30 60rpm, 175 psi at 10bpm Mill/ReamlWash down to 355' at 1200ftib, 24k WOB, continue to 359', Mill/Ream/Wash down to 367' at 1200RIb, 2-4k WOB, continue to 370', torque spiked to 2000ftib at 371', PIU and ease back down, able to drift without rotating, just washing down at 10 bpm at 175 psi. Continue in hole to 392' and see tag up with 2k down weight, continue milling/washing/reaming down with 60 rpm at 700 fUlb to 3000 ft/Ib torque with 10bpm at 175 psi to 399.4' and lake 5k WOB tag up with 3,000 ft/lbs torque. Pick up off bottom to prepare and POOH. Page 19138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log startDepth Stmt Time End Time our (hr) Phase Op carte Activity Coee Time P -T -X Operadon (fiKB) End Depth (flKB) 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP TRIP T Circulate, pump Hi -Vis Sweep out of 0.0 0.0 06:30 07:00 hole at 399', nothing abnormal over shakers, a few small pieces of soft/semi-hard cement 3cm x 3cm size. Shakers clean after sweep out. POOH. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP BHAH T BID and LID BHA#59 8-3/4" string mill 0.0 0.0 07:00 07:30 BHA and M/U 8-1/4" short string mill and RIH with BHA #60. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA#60 to 399', no tag ups, 0.0 0.0 07:30 08:00 slick. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP MILL T P/U at 399' and establish parameters 0.0 0.5- 08:00 09:00 700ftlb at 60rpm, 175 psi at 10bpm Mill/Ream/Wash down to 418.5' at 700 fUlb to 1000ftlb torque, 0-1k WOB, hole slick, no issues (could not go to 419' to tag top of 7" casing cut due to TDS stand down to rig floor. Prepare Ito POOH. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP CIRC T Circulate, pump Hi -Vis sweep at 0.0 0.0 09:00 09:30 418.5', sweep clean at shakers, nothing abnormal over shakers. Perform dg service on TDS. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP TRIP T POOH from 418.5' with BHA#60, slick 0.0 0.0 09:30 10:00 no over pull, mill assembly clean. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP BHAH T BID and LID BHA #60, P/U and M/U 7" 0.0 0.0 10:00 11:00 casing spear assembly with jars and bumper sub and RIH with fishing BHA #61. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP TRIP T RIH to 418' with spear fishing BHA 0.0 0.0 11:00 11:30 #61 to engage 7" cut casing fish at 419'. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP FISH T P/U at 418' and establish parameters 0.0 0.0 11:30 12:00 100 psi at 5bpm, hole slick, no issues. Slack off from 418' to 419' and engage 7" x 5' cut fish with spear with t Ok slack off and no measureable increase in string weight. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP TRIP T Circulate and Prepare to POOH, 0.0 0.0 12:00 13:00 POOH with 7" x 5' cut fish from 424' bottom of fish and 419' lop of fish to surface laying out fishing assembly and fish. Area of 9-5/8" at 398' took overpull and 5 jar attempts to free fish at 100k over, Only sign on fish was a slight roll of the top of the 7" cut, fishing tool assembly showed no sign of abnormal wear or cuts. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP SHAH T Lay down 4.9' of 7" fish, B/D and UD 0.0 0.0 13:00 13:30 spear fishing assembly BHA #61. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP SFTY T Perform DROPS inspection of derrick 0.0 0.0 13:30 14:00 and TDS, all good, no finds. 2/3/2019 2/3/2019 0.50 COMPZN RPCOMP SHAH T P/U and M/U 8-1/4" x 8-1/2" tandem 0.0 0.0 14:00 14:30 milling assembly BHA#62 and RIH 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#62 to 392'slick with no 0.0 0.0 14:30 15:30 tag up spots. 2/3/2019 2/3/2019 1.00 COMPZN RPCOMP MILL T P/U and M/U TDS at 392' and 0.0 0.0 15:30 16:30 establish parameters 171 psi at 10bpm, hole slick, no issues until 398' and tag up with 10k down, same as we seen early, mill assembly not acting like mill was engaging. Prepare Ito POOH. Page 20138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 16 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log San Depth Sart Tme End Time our (hr) Phase Op Code Activity Cace Time P -T -X Operation (W15) End Depth(ftKB) 2/3/2019 2/4/2019 7.50 COMPZN RPCOMP RGRP T Rig service TDS, change out IBOP 0.0 0.0 16:30 00:00 due to jarring fatigue of automatic gear on IBOP, change out saver sub. PU bull plug, pressure test IBOP on TDS 250psi, 2500psi 5min FAIL. Remove upper IBOP, lower safety valve. Found sheared dowell in clamp. Service TDS, replace broken/damaged parts. Retrieve mechanic stuck behind rig move. 2/4/2019 2/4/2019 6.00 COMPZN RPCOMP RGRP T Repair IBOP onTDS. Replace SOP 0.0 0.0 00:00 06:00 shifter and gear control and function test, pressure test 250, 2500psi. Good Tests. 2/4/2019 2/4/2019 1.00 COMPZN RPCOMP SVR- T Clear and clean rig Floor, final 0.0 0.0 06:00 07:00 inspection on TDS, DROPS inspection on TDS, prepare to POOH 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T POOH w/ BHA #62 0.0 0.0 07:00 07:30 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD BHA #62, UD 8-1/4" 0.0 0.0 07:30 08:00 string mill and M/U and RIH with BHA #63 8-1/2" string mill assembly. 2/4/2019 2/412019 0.50 COMPZN RPCOMP TRIP T RIH with 8-1/2" milling assembly BHA 0.0 0.0 08:00 08:30 #63 to 398', hole slick no obstructions. 2/4/2019 2/4/2019 1.00 COMPZN RPCOMP MILL T PIU at 398' and establish parameters 0.0 0.0 08:30 09:30 700ftlb at 60rpm, 175 psi at 10bpm Mill/ReamM/ash down to 424' at 700 ft/lb to 3000ft1b torque, 0-2k WOB, hole slick, no issues. Prepare to POOH. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T Circulate, pump Hi -Vis Sweep out of 0.0 0.0 09:30 10:00 hole at 423', nothing abnormal over shakers. Shakers clean after sweep out. POOH with BHA #63, no over pull encountered, hole slick, hole taking proper displacement. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD BHA#63, and M/U 8-1/4" 0.0 0.0 10:00 10:30 string mill on bottom in tandem with 8- 1/2" string mill and RIH with tandem milling assembly BHA #64. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T RIH with 8-1/4" x 8-1/2" tandem milling 0.0 0.0 10:30 11:00 assembly BHA #64 to 392', hole slick no obstructions. 21412019 214/2019 1.00 COMPZN RPCOMP MILL T P/U at 392' and establish parameters 0.0 0.0 11:00 12:00 700ft1b at 60rpm, 175 psi at 1 Obpm Mill/Ream/Wash down to 396' at 700 ft/Ib to 3000ftlb torque, 0-5k WOB, at 397' stacked up weight without mill engaging. Prepare to POOH. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T Circulate, pump Hi -Vis Sweep out of 0.0 0.0 12:00 12:30 hole, nothing abnormal over shakers. Shakers clean after sweep out. POOH with BHA #64, no over pull encountered, hole slick, hole taking proper displacement. 2/412019 2/4/2019 0.50 COMPZN RPCOMP BHAH T Inspect mills, no abnormal wear on 0.0 0.0 12:30 13:00 milling assembly but on bull nose, BID and UD BHA #64, and M/U 8" x 8-1/2" tandem milling assembly BHA #65. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T RIH BHA #65 on 3-1/2" DP to 395' 0.0 0.0 13:00 13:30 picking up singles out of pipe shed and racking DP back to make room in pipe shed for bringing in 7" casing to be strapped, drifted, and prepared for running on off -drillers side. Page 21138 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Start Time End Time Our (hr) Phae Op Cotle Activity Code Time P -T -X Operation (flKB) End Depth IRKS) 2/4/2019 2/4/2019 1.00 COMPZN RPCOMP MILL T P/U at 392' and establish parameters 0.0 0.0 13:30 14:30 700ftlb at 60rpm, 175 psi at 10bpm Mill/Ream/Wash down to 399' at 700 ft/lb to 3000ftib torque, 0-5k WOB, stacked up weight without mill engaging. Prepare to POOH. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T Circulate, pump Hi -Vis Sweep out of 0.0 0.0 14:30 15:00 hole, nothing abnormal over shakers. Shakers clean after sweep out. POOH with BHA #65, no over pull encountered, hole slick, hole taking proper displacement. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP SVRG T Rig service, service TDS rotary sensor 0.0 0.0 15:00 15:30 and service pipe skate and re -arrange derrick stands to continue POOH and racking back stands with drill collars in better position. 2/4/2019 214/2019 0.50 COMPZN RPCOMP BHAH T Inspect mills, no abnormal wear on O.0 0.0 15:30 16:00 milling assembly but on bull nose, B/D and UD BHA #65, and M/U 8-3/8" x 8- 1/4" tandem milling assembly BHA #66. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA #66 milling assembly 0.0 0.0 16:00 16:30 picking up 3-1/2" DP singles out of pipe shed to 392'. 2/4/2019 2/4/2019 2.00 COMPZN RPCOMP MILL T P/U at 392' and establish parameters 0.0 0.0 16:30 18:30 706ftib at 60rpm, 175 psi at IObpm Mill/Ream/Wash down 39T -99'1.5k TQ continue to 401-408', 1.5k TO, continue in hole to 423'. Backream to 390'then drift slick to 423'. Pump 10bbi sweep. Prepare to POOH. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T POOH w/ BHA#66. No over pull 0.0 0.0 18:30 19:00 encountered, hole slick, hole taking proper displacement. 2/4/2019 2/4/2019 1.50 COMPZN RPCOMP SHAH T Inspect mills, no abnormal wear on 0.0 0.0 19:00 20:30 milling assembly but on bull nose, B/D and UD BHA #66, and M/U 8-3/8" x 8- 1/2" tandem milling assembly on DC BHA#67. 2/4/2019 214/2019 0.50 COMPZN RPCOMP TRIP T Trip in hole picking up 3 1/2" DP to 0.0 0.0 20:30 21:00 1 1 1355' 2/4/2019 2/4/2019 2.00 COMPZN RPCOMP MILL T P/U and establish parameters 0.0 0.0 21:00 2300 PU/SO/ROT wt 45k, 6501111b at 60rpm, 160 psi at 10bpm Mill/Ream/Wash tight spots @ 363'-370', 2.5k TO, 380'- 385' 1.4k TQ, 3991402' 1.6k TQ and 410'415' 2.3k TQ, continue down to 420'. Backream to 360', max TQ 1.2K. Prepare to POOH. 2/4/2019 2/4/2019 0.50 COMPZN RPCOMP TRIP T POOH w/ BHA#67. No over pull 0.0 0.0 23:00 23:30 encountered, hole slick, hole taking proper displacement. 2/4/2019 215/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD BHA #67 0.0 0.0 23:30 00:00 2/512019 2/5/2019 1.00 COMPZN RPCOMP BHAH T LD BHA #67, PU BHA #68 5- 0.0 0.0 00:00 01:00 7/8"overshot with 3 1/2" grapple, jars and bumper sub on 3 stands 4 3/4" DC. 2/512019 2/5/2019 1.00 COMPZN RPCOMP TRIP T Trip in hole f/ 301' to top of 7" rasing 0.0 0.0 01:00 02:00 stub @ 426.5', set down 5K. Work pipe up and down rotating, drop in. TIH to 1819' set down 5K. Page 22138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Depth sten Time End Time Dur (hr) Phase Op Code ANvity Cone Time P -T -X Operation (ftK8) End Depth (ftKS) 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP FISH T PU, establish parameters PU/SO 0.0 0.0 02:00 03:00 60K/60K, 185psi @ 4bpm. Attempt to wash down. Al bottoms up saw artic pac come over shakers then cleaned up. Wash to 1821', pump pressure increased to 270psi. PU, no overpull and wash down @ 10bpm, pump pressure increasing, attempt to clean up, unable to get any deeper. POOH to change BHA. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP TRIP T Trip out of hole. No over pull 0.0 0.0 03:00 04:00 encountered, hole slick, hole taking proper displacement. 2/5/2019 2/5/2019 1.50 COMPZN RPCOMP SHAH T B/D and UD BHA#68, and M/U 0.0 0.0 04:00 05:30 reverse junk basket, jars and bumper sub on 3 stands 4-3/4" DC and RIH with BHA #69. 2/5/2019 2/5/2019 1.50 COMPZN RPCOMP TRIP T Trip in hole f/ 306' with BHA #69 to 0.0 0.0 05:30 07:00 1790', hole slick no issues entering top of cut 7" rasing. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP CIRC T Circulate reverse junk basket down 0.0 0.0 07:00 07:30 from 1790' to 1828' with I Obpm at 765 psi and work junk basket up and down in 3' strokes and observe good signs junk moving into reverse basket. Prepare to POOH. 2/5/2019 2/5/2019 2.00 COMPZN RPCOMP TRIP T POOH with BHA #69 to surface, hole 0.0 0.0 07:30 09:30 slick, well taking proper displacement. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP BHAH T BID and UD reverse junk basket BHA 0.0 0.0 09:30 10:00 #69, large 5" by 3" pieces x 4 of cut and milled/tore 9-5/8" rasing retrieved in junk basket. P/U and M/U BHA#70 with re -dressed reverse junk basket and cages and RIH. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#70 to 1780', hole slick, 0.0 0.0 10:00 11:00 no tag ups or issues entering top of 7" cul casing. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP CIRC T Circulate reverse junk basket down 0.0 0.0 11:00 11:30 from 1790' to 1828' with 10bpm at 765 psi and work junk basket up and down in 3' strokes and observe good signs junk moving into reverse basket. Prepare to POOH. 2/5/2019 2/52019 1.00 COMPZN RPCOMP TRIP T POOH with BHA#70 to surface, hole 0.0 0.0 11:30 12:30 1 1 slick, well taking proper displacement. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP BHAH T BID and UD reverse junk basket BHA 0.0 0.0 12:30 13:00 #70, large 3" by 2" pieces x 4 of cut and milled/tore 9-5/8" casing retrieved in junk basket along with 10 pounds of fine millings, only a few pieces of rounded formation and cement 3cm x 3cm (formation looks to be black gravel). PIU and MIU BHA#71 with re- dressed reverse junk basket and cages and RIH. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#71 to 1780', hole slick, 0.0 0.0 13:00 14:00 no tag ups or issues entering top of 7" cut casing. 2/52019 2/52019 1.50 COMPZN RPCOMP CIRC T Circulate reverse junk basket down 0.0 0.0 14:00 15:30 from 1790'to 1828' wbh 10bpm at 765 psi and work junk basket up and down in 3' strokes and observe good signs junk moving into reverse basket. Prepare to POOH. Page 23/38 Report Printed: 2121/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Sten Depth Start Mme End Time our (hn Phase Op Code Ac&m, Code Time P -T -X Operation (IIKB) EM Depth (NCS) 2/5/2019 2/5/2019 2.00 COMPZN RPCOMP TRIP T POOH with BHA#71 to surface, hole 0.0 0.0 15:30 17:30 slick, well taking proper displacement. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP BHAH T B/D and UD reverse junk basket BHA 0.0 0.0 17:30 18:30 #71, large 3" by 2" pieces x 4 of cut and milled/tore 9-5/8" casing retrieved in junk basket along with 10 pounds of fine millings, only a few pieces of rounded formation and cement 3cm x 3cm (formation looks to be black gravel). P/U and M/U BHA#72 with reverse junk basket. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP TRIP T RIH with BHA#72 to 1780', hole slick, 0.0 0.0 18:30 19:00 no tag ups or issues entering top of 7" cut casing. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP CIRC T Circulate reverse junk basket down 0.0 0.0 19:00 20:00 from 1790' to 1828' with 10bpm at 765 psi and work junk basket up and down in 3' strokes and observe good signs junk moving into reverse basket. Prepare to POOH. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP TRIP T POOH from 1828' to surface. Hole 0.0 0.0 20:00 21:00 slick, no overpull issues, hole taking proper displacement. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP BHAH T B/D and clean out reverse junk 0.0 0.0 21:00 21:30 basket BHA#72 with 2large 3X3" pieces looks like 9 5/8"casing. RIH with BHA#73 to clean top of fish at 1828'. 2/5/2019 2/5/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#73 to 1820', hole slick, 0.0 0.0 21:30 22:30 no tag ups or issues entering top of 7" cut casing. 2/5/2019 2/5/2019 0.50 COMPZN RPCOMP CIRC T Circulate reverse junk basket down 0.0 0.0 22:30 23:00 from 1820' to 1828' with 10bpm at 765 psi and work junk basket up and down in 3' strokes and observe good signs junk moving into reverse basket. Prepare to POOH. 2/5/2019 2/6/2019 1.00 COMPZN POOH from 1828' to surface. Hole 0.0 OA 23:00 00:00 slick, no overpull issues, hole laking proper displacement. 2/6/2019 2/6/2019 2.00 COMPZN RPCOMP BHAH T B/D and UD reverse junk basket BHA 0.0 0.0 00:00 02:00 #73, clear and clean rig floor. P/U and M/U BHA#74 with Baker Overshot Short Catch dressed with 3-1/2" grapples and RIH. 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA #74 to 1820'. 0.0 0.0 02:00 03:00 2/6/2019 2/6/2019 1.50 COMPZN RPCOMP FISH T Attempt to engage fish with BOS at 0.0 0.0 03:00 04:30 1828' and utilizing pump to try and wash over, pushed/washed fish down to 1833' washing down to 1844' with 15k set down weight and 5bpm at 225 psi. Prepare to POOH. 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP TRIP T POOH with BOS BHA#74 to surface 0.0 0.0 04:30 05:30 and inspect overshot, wear observed starting into the overshot but not to the grapple. Re -dress BOS and paint the bottom of the BOS and RIH with BHA #75 2/6/2019 2/6/2019 0.50 COMPZN RPCOMP FISH T M/U BHA# 75 with Baker overshot 0.0 0.0 05:30 06:00 RIH and t/ 1834' latch up on fish POOH No fish redress over shot RIH W/ BHA # 75 Page 24138 Report Printed: 2/2112019 Operations Summary (with Timelog Depths) a 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log start Depth Ste t Time End Time our (hr) Phase Op Cotle Activity Code Time P -T -X Operation (WB) End OepN (WB) 2/6/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA #75 to 1820'. 0.0 0.0 07:00 2/6/2019 0.50 COMPZN RPCOMP FISH T Attempt to engage fish with BOS at 0.0 0.0 07:30 1844' and utilizing no pump, squat 15k down and pick up length of bumper E2/6/20199 sub and set 15k back down x 3 times at 1844' with 15k set down weight, pick up T to 1841 and observe 2-3k overfull. Prepare to POOH. 2/6/2019 1.50 COMPZN RPCOMP TRIP T Break TDS connection and blow out 0.0 0.0 07:30 09:00 Kelly, notice pipe full, good sign fish is engaged. POOH with 2-3k over initial string weight from 1841'to surface. FISH at surface at 09:00 hrs. 2/6/2019 2/6/2019 0.50 COMPZN RPCOMP SHAH T B/D and UD BHA #75, BOS and 5- 0.0 0.0 09:00 09:30 314" string mill fish. 2/6/2019 2/6/2019 0.50 COMPZN RPCOMP SHAH P PIU and M/U Baker cutter assembly 0.0 0.0 09:30 10:00 and RIH with BHA $76. 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP TRIP P RIH with Baker cutting assembly BHA 0.0 0.0 10:00 11:00 #76 to 1758'. 2/6/2019 2/6/2019 0.50 COMPZN RPCOMP CUTP P S/O from 1758' to 1777' and M/U TDS, 0.0 0.0 11:00 11:30 P/U to 1769' and record parameters, 3 bpm at 365 psi, 1 bpm at 63 psi, S/O at 55k P/U at 55k. S/O f/ 1769' to 1783' at 1 bpm at 365 psi, P/U to 1769' and increase pump to 4 bpm and SIO from 1769'to 1778' and observe cutters tag up on collar connection in 7", PM to 1770' and SIO to 1778' and verify connection in 7". Shut down pumps and pick up to cut depth at 1748'. Bring up pumps to 5 bpm at 880 psi and engage TDS at 60 rpm at 1,200 ft/lbs torque and observe cutters engaging 7" with 2,000 f 1lb torque and 900 psi for 30 rotations and pressure drop to 680 psi and torque drop to 1,200 tVlbs, slack off 10th of a foot to observe 1 k WOB for 5 minutes with weight drilling off, slack off another 10th of a foot and observe 1 k WOB for 5 minutes, rotated with cutter total of 15 minutes. All indication good cut. Circulated a total of 1.5 bottoms from moment of cut, no Arctic Pack Observed at surface. 2/6/2019 2/6/2019 0.50 COMPZN RPCOMP OWFF P Observe Well for Flow 10 minutes. 0.0 0.0 11:30 12:00 Well Static. 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP TRIP P B/O TDS and blow down Kelly. POOH 0.0 0.0 12:00 13:00 with BHA#76 from 1748'to surface and inspect stabilizer and Baker casing cutter. No abnormal wear observed on cutter, all indications we have a clean cut. 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP BHAH P BID and UO BHA#76 Baker casing 0.0 0.0 13:00 14:00 cutter assembly. P/U and M/U BHA #77 Baker 7" pack off, 7" spear, bumper sub and jars and RIH. 2/6/2019 2/8/2019 0.50 COMPZN RPCOMP TRIP P RIH with BHA#76 to 420. 0.0 0.0 14:00 14:30 Page 25138 Report Printed: 2121/2019 Operations Summary (with Timelog Depths) 2T-22 1 K111117 -1=P, 60 1 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth StartTime End Tim. Dur (hu Phase Op Code Activity Code Time P -T -X Operation ni Ertl Depth otKe) 2/6/2019 2/6/2019 1.00 COMPZN RPCOMP FISH P M/U TDS and record parameters, 1 0.0 0.0 1430 15:30 bpm at 60 psi and slack off from 420' to 424' and engage 7" casing cut observing pressure build to 110 psi, shut off pump and squat down on fish with 15k down and work bumper sub back down onto fish 3 times and pick up. Original P/U 55k, pick up with fish at 110k and space out drill pipe in stack to close Annular. 2/6/2019 2/6/2019 7.50 COMPZN RPCOMP CIRC P Close Annular with fish engaged at 0.0 0.0 1530 23:00 424' with bottom of 7" cut at 1747' and lined up to take returns though Braden Head line to choke house / Tiger Tanks. Bring on LRS with heated Brine 80 bbls ahead, followed by 42 bbls heated Diesel, followed by 75 bbls heated Brine and spot Diesel in 7" and 9-5/8" Annulus. 2/6/2019 2/7/2019 1.00 COMPZN RPCOMP OWFF P Start Clean up all pits and start 0.0 0.0 23:00 00:00 building clean 9.3 brine in pits Allow the diesel to soak on 7 X 9 5/8 Annulus 2/7/2019 2/7/2019 3.00 COMPZN RPCOMP CLEN P Continue clean up all pits and start 0.0 0.0 00:00 03:00 building clean 9.3 brine in pits Allow the diesel to soak on 7 X 9 5/8 Annulus 2/7/2019 2/7/2019 1.50 COMPZN RPCOMP CIRC P Start displace well with clean 9.3 ppg 0.0 0.0 03:00 04:30 brine @ 6 bbls min w/320 psi taking all returns to flow back tank Shut down and monitor well 15 mins All good 2/7/2019 2/7/2019 5.00 COMPZN RPCOMP PULD P POOH slow and stand back 4 stand of 0.0 0.0 04:30 09:30 HT 38 D.P and UD Baker Spear and UD 7" casing 2/7/2019 2/7/2019 1.00 COMPZN RPCOMP BHAH P P/U and M/U 7" polish mill assembly 0.0 0.0 09:30 10:30 and RIH with BHA#77. 2/7/2019 2/7/2019 1.00 COMPZN RPCOMP TRIP P RIH with BHA#77 tp 409' and tag up 0.0 0.0 10:30 11:30 iwith 5k down, work tight spot, POOH. 2/7/2019 2/7/2019 2.00 COMPZN RPCOMP BHAH P B/D and UO BHA#77 and P/U and 0.0 0.0 11:30 13:30 M/U 2 x 8-1/2" string mill assembly in tandem and RIH with BHA#78. 2/7/2019 2/7/2019 0.50 COMPZN RPCOMP TRIP P RIH with BHA#78 to 399' and take 2k 0.0 0.0 13:30 14:00 bobbles of weight down. 2/7/2019 2/7/2019 4.00 COMPZN RPCOMP MILL P P/U and establish parameters, 5bpm 0.0 0.0 14:00 18:00 at 600 psi, 60 rpm at 1,200 ft/lbs of torque, Mill/Drift/Wash down from 399' to 436' with 1,200 to 4,000 ft/lbs of torque and start taking weight again at 436', Mill/Drift/Wash from 436' to 447' with 1,200 to 4,000 ft/lbs at 60 rpm at 2-5 bpm with 200 to 600 psi. Continue to RIH drifting 9-5/8" casing with tandem 8-1/2" mill assembly.t/ 447' POOH due to high torque 2/7/2019 2/8/2019 6.00 COMPZN RPCOMP MILL P C/O BHA# 79 and Make BHA# 80 0.0 1800 0000 RIH with 8 3/8" mill t/ 1748' to top of 7" stub with no issues POH and UD BHA # 80 M/U BHA #81 with a single 8.5 Mill RIH to 449' tag up Start Mill/Wash down t/456' PUW 45 SOW 40 ROT 45 Tq 800-1800 ft Page 26/38 Report Printed: 2/2112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log stall Depth Ste" Time EiW Tene Dur (hr) Phase Op code A00ty Code Time P -T -X Operation (itKe) End Depen (MB) 2/8/2019 2/8/2019 7.50 COMPZN RPCOMP REAM P RIH to 449'tag up Start MiIIPNash 0.0 0.0 00:00 07:30 down 0456'. Ream Through 3X no issues PUW 45 SOW 40 ROT 45 Tq 800-1800 ft WOM 1-2k Clean up @ 0030 Continue RIH and tag up @ 1748', hole slick and clear from 456' down to top of 7" cut. Prepare to POOH. 2/8/2019 2/8/2019 1.00 COMPZN RPCOMP TRIP P POOH with BHA#81 from 1748', no 0.0 0.0 07:30 08:30 issues going through tight spots from 456' to 392'. 218/2019 2/8/2019 0.50 COMPZN RPCOMP BHAH P B/D and LID BHA #81. P/U and M/U 0.0 0.0 08:30 09:00 BHA#82 8-1/2" tandem mills on 6- 1/4" DCs with 8' flex joint between the mills and RIH. 202019 2/8/2019 0.50 COMPZN RPCOMP TRIP P RIH with BHA#82 to 407' with no 0.0 0.0 09:00 09:30 issues going in hole. 2/8/2019 2/8/2019 1.50 COMPZN RPCOMP MILL P Tag up @407' Milling/Reaming f/407 0.0 0.0 09:30 11:00 t/452' pass with 1 - 5 bpm 200 psi to 600 psi, PUW 45 SOW 40 ROT 45, Tq 800-3800 ft WOM 1-2k fro 3X without getting through below 452' without laking over 5k WOM. Prepare to POOH. 2/8/2019 2/8/2019 0.50 COMPZN RPCOMP TRIP P POOH with BHA #82 from 1748', no 0.0 0.0 11:00 11:30 issues going through tight spots from 456' to 392'. 2/8/2019 2/8/2019 0.50 COMPZN RPCOMP SHAH P BID and LID BHA#82. P/U and M/U 0.0 0.0 11:30 12:00 BHA#83 8-1/2" tandem mills on 6- 1/4" DC with flex joint removed, sorter assembly and RIH. 2/8/2019 2/8/2019 0.50 COMPZN RPCOMP TRIP P RIH with BHA#83 to 407' with no 0.0 0.0 1200 12:30 issues going in hole. 2/8/2019 2/8/2019 2.00 COMPZN RPCOMP MILL P Tag up @407' Milling/Reaming f/407 0.0 0.0 1230 14:30 0455' pass with 1 - 5 bpm 200 psi to 600 psi, PUW 45 SOW 40 ROT 45, Tq 800-3800 ft WOM 1-2k fro 5X without getting through below 455' without taking over 5k WOM. Prepare to POOH. 2/8/2019 2/8/2019 0.50 COMPZN RPCOMP TRIP P POOH with BHA#83 from 1748', no 0.0 0.0 14:30 15:00 issues going through tight spots from 456' to 392'. 2/8/2019 2/8/2019 0.50 COMPZN RPCOMP BHAH P BID and LID BHA#83. P/U and M/U 0.0 0.0 15:00 15:30 BHA#84 8-318" x 8-1/2" tandem mills flexible on DP without 6-14" DC and RIH. 2/812019 2/8/2019 0.50 COMPZN RPCOMP TRIP P RIH with BHA#84 to 407' with no 0.0 0.0 15:30 16:00 issues going in hole. 2/8/2019 2/8/2019 2.00 COMPZN RPCOMP MILL P Tag up @407' Milling/Reaming f/407 0.0 0.0 16:00 18:00 0457' pass with 1 - 5 bpm 200 psi to 600 psi, PUW 45 SOW 40 ROT 45, Tq 800-3800 ft WOM 1-2k fro 3X wiping out fight spots until smooth. Continue RIH and lag up @ 1748', hole slick and clear from 456' down to lop of 7" cut. Prepare to POOH. 2/8/2019 2/8/2019 3.00 COMPZN RPCOMP MILL P RIH with BHA # 85 Tag up @ 453' 0.0 18:00 21:00 PUW 45 SOW 40 ROT 45 Ream /mill F/ 453T/ 456' 800 - 2700 ft WOB 1=3 POOH 2/8/2019 2/9/2019 3.00 COMPZN RPCOMP MILL P M/U BHA# 86 with 1 6 1/4" D.0 w/ 8 21:00 00:00 1/2" X 8 1/2" Mills RIH Tag up @ 410 Ream F/ 410 -450 w/ 1-3 WOB Page 27/38 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) / 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Sten Depth Start Time End Time Dur (hr) Phase Op Code A vdy Code Time P -T -X Opeiatlon (@KB) End Depth (ftKB) 2/9/2019 2/9/2019 2.50 COMPZN RPCOMP MILL P Continue to dress @ 410 Ream F/ 0.0 0.0 00:00 02:30 410 -450 w/ 1-3 WOB pass/drift 3X 2/9/2019 2/9/2019 2.00 COMPZN RPCOMP TRIP P Continue RIH to top of 7" stub @ 0.0 0.0 02:30 04:30 1748' with no issues POOH 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP BHAH P UD BHA# 86 and M/U BHA# 87 w/ 0.0 0.0 04:30 05:30 Baker Mill shoe 8-1/8" polish mill with Hydro Jars and RIH to clean off top of 7" casing stub 2/9/2019 2/9/2019 2.00 COMPZN RPCOMP TRIP P RIH with BHA#87 and tag up at 435' 0.0 0.0 05:30 07:30 and attempt to get mill down without success, POOH from 435'to surface. 2/9/2019 2/9/2019 0.50 COMPZN RPCOMP BHAH P B/D and UD BHA #87 and prepare to 0.0 0.0 07:30 08:00 slip and cut drilling line. 219/2019 2/9/2019 2.00 COMPZN RPCOMP SLPC P Rig service, slip and cul drilling line 0.0 0.0 08:00 10:00 and perform tests. 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP BHAH P P/U and M/U BHA# 88 w/ Baker Mill 0.0 0.0 10:00 11:00 shoe 8-1/2" mill and RIH. 2/9/2019 2/9/2019 1.50 COMPZN RPCOMP TRIP P RIH with BHA#88 and tag up at 435' 0.0 0.0 11:00 12:30 and mill down to 500', POOH from 500'to surface. no overpull issues. 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP BHAH P BID and UD BHA#88, PIU and M/U 0.0 0.0 12:30 13:30 BHA#89 w/ Baker Mill shoe 8-1/8" polish mill without Hydro Jars and RIH to clean off top of 7" casing stub. 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP TRIP P RIH with BHA#89 and lag up at 435' 0.0 0.0 13:30 14:30 and attempt to get mill down without success, POOH from 435'to surface. 219/2019 2/9/2019 1.00 COMPZN RPCOMP BHAH P B/D and UD BHA #89, PIU and M/U 0.0 0.0 14:30 15:30 BHA#90 w/ 8-314" string mill limber on drill pipe and RIH to dress 7" casing from 427' to 448'. 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP TRIP P RIH with BHA#90 and slack off 0.0 0.0 15:30 16:30 through 400' to 560' without any tag ups with 8-3/4" mill on drill pipe. Prepare to POOH. POOH with BHA #90, hole slick no overpull spots, well taking proper displacement. 2/9/2019 2/9/2019 1.00 COMPZN RPCOMP BHAH P B/D and UD BHA #90, PILI and M/U 0.0 0.0 16:30 17:30 BHA #91 with tandem 8-1/2" x 8-3/4" string mills limber on drill pipe and RIH to dress 7" casing from 350' 2/9/2019 2/10/2019 6.50 COMPZN RPCOMP TRIP P Tag up at 350' Ream and Mill F/ 350- 0.0 0.0 17:30 00:00 440' PU W 43K SOW 41 K ROT 38K @ 7 BBLS 200 PSI 2/10/2019 2/10/2019 2.50 COMPZN RPCOMP MILL P Continue Ream and Milling F/ 440' 0.0 0.0 00:00 02:30 T/460' PUW 43K SOW 41 K ROT 38K WOB 1-3K @ 7 BBLS 200 PSI drift F/ 3507/490 with no issue.Eslimate 250 Ib metal shavings f/ 9 518" casing 2/10/2019 2/10/2019 2.50 COMPZN RPCOMP TRIP P POOH and check BHA# 91 Both mills 0.0 0.0 02:30 05:00 in gage M/U BHA# 92 and Add 1 Stand 6 1/4" D.0 RIH and drift T1485' No issue POOH UD mills 2/10/2019 2/10/2019 1.00 COMPZN RPCOMP TRIP P M/U BHA# 93 with Baker 7" mill Shoe 0.0 0.0 05:00 06:00 8 1/8" RIH Dress off top of 7" casing stub@ 1748'. 2/10/2019 2/10/2019 2.00 COMPZN RPCOMP MILL P Dress off top of 7" casing stub@ 0.0 0.0 06:00 08:00 1748', reamed 7" times, pumped sweep out of well, clean returns. 2/10/2019 2/10/2019 2.00 COMPZN RPCOMP TRIP P POOH with BHA #93 to surface 0.0 0.0 08:00 10:00 1 2/10/2019 2/10/2019 2.00 COMPZN RPCOMP BHAH P BID and UD polish mill assembly, 0.0 0.0 10:00 12:00 1 I I clear and clean rig floor. Page 28/38 Report Printed: 212112019 Operations Summary (with Timelog Depths) 2T-22 • Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth StartTime EM Time our (m) Phase Op Code Activity Code Time P -T -X Operabon (WEI) End Depth(WS) 2/10/2019 2/10/2019 1.00 COMPZN RPCOMP PULD P Make up wear bushing puller on joint 0.0 0.0 12:00 13:00 of DP and retrieve/pull wear bushing and lay out same. 2/10/2019 2/10/2019 1.00 COMPZN RPCOMP CIRC P P/U and M/U jet sub and magnet and 0.0 0.0 13:00 14:00 jet well head and BOPE two cycles, B/D and UD magnet and jet sub, 2 lbs of metal recovered. 2/10/2019 2/10/2019 0.50 COMPZN RPCOMP SFTY P PJSM, rig up Weatherford and 0.0 0.0 14:00 14:30 prepare to pick up Baker Casing patch with Halliburton stage tool assembly and RIH picking up 7" casing. 2/10/2019 2/10/2019 0.50 COMPZN RPCOMP RURD P Rig up Weatherford, change elevators, 0.0 0.0 14:30 15:00 prepare handling equipment and P/U Baker casing patch and inspect and RIH set slips in rotary. 2/10/2019 2/10/2019 6.00 COMPZN RPCOMP RCST P P/U and M/U HYD563 7" 26# L-80 0.0 0.0 15:00 21:00 rasing to 9.4001V1bs torque and RIH 34 joints, 1 x 8' pup, 1 x 10' pup, 1 x 20' pup, and 6 joints with centralizers every other joint down to 1748' and engage 7" casing cut and swallow down to 1751' shoe depth and set down 10k, pick up to neutral and set rotary slips, stage tool depth at 1737'. RIH t/ 1748' SOW 67K PU 10K over 2/10/2019 2/11/2019 3.00 COMPZN RPCOMP CMNT P R/U Halliburton Cement Head and 0.0 21:00 00:00 load Plug Hold PJSM w/ SLB Cement Crew and test 7" casing it 2500 psi OK Continue pressure up U 3300 psi shift open stage tool CBU @ 5 bbls min w/ 180 psi 2/11/2019 2/11/2019 4.00 COMPZN CEMENT CMNT P Line up SLB Cement unit to rig floor 0.0 O.0 00:00 04:00 and start pumping 5 bbls water ahead and shut down and test lines t/ 3000psi ok cont pumping 60 bbls 15.7 ppg ASI cement @ 4 bbls shut down drop Halliburton wiper plug and chase w/ 1.5 bbls cement 3.5 bola water @ 4 bbls min shut down displace w/ 9.3 brine w/ rig pump @14 bible min and 54.5 bbls and bump plug and test to 2550 and Gose cement tool and open up and check tool bleed off to 0 psi w/ no flow back Blow Down flow back tank CIP @ 00:30 1 bbl cement Back Clean up Stack Flush out all lines. R/D Cement head and go to phase 3 stand by. 2/11/2019 2/11/2019 8.00 COMPZN RPCOMP WAIT P Wait on weather phase 3 conditions 0.0 0.0 04:00 12:00 2/11/2019 2/11/2019 1.00 COMPZN RPCOMP NUND P Nipple down BOPE and pick up stack 0.0 0.0 12:00 13:00 T and clean well head housing, center 7" rasing in well head. 2/11/2019 2/11/2019 1.00 COMPZN RPCOMP W WSP P Set C-22 slips engaged with 40 kips 0.0 0.0 13:00 14:00 down. 2/11/2019 2/11/2019 1.00 COMPZN RPCOMP NUND P Cut 7" joint and lay out, nipple down 0.0 0.0 14:00 15:00 DSA on BOP and rack back BOP. 2/11/2019 2/11/2019 1.00 COMPZN RPCOMP W WSP P Dress 7" cut and set pack off. 0.0 0.0 15:00 16:00 2/11/2019 2/11/2019 2.00 COMPZN RPCOMP NUND P P/U and N/U 7-1/6" 5M x 11" 3M 0.0 0.0 16:00 18:00 1 1 Tubing head and test pack off to 2,800 psi, tested good. Page 29138 Report Printed: 2/2112019 ` Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log start Depth sold Time ErMTim9 Dur(hr) Phase Op Code Activit' Code Time P -T -X Operimon (RKS) End Deplh(RKB) 2/11/2019 2/12/2019 6.00 COMPZN RPCOMP NUND P Nipple up BOP with DSA and Spool 7- 0.0 0.0 18:00 00:00 1/16" 5M x 11" 5M x 13-5/8" 5M and torque bolts. Change out LPR from 7" to 2-7/8" x 5" VBR and prepare BOPE to pressure test. 2112/2019 2/12/2019 1.50 COMPZN RPCOMP RURD P PJSM R/U Test equipment f/ BOP lest 0.0 0.0 00:00 01:30 2/12/2019 2/1212019 9.50 COMPZN RPCOMP BOPE P Testing BOP t/ 250/2500 PSI AOGCC 0.0 0.0 01:30 11:00 Witness waived Bob Noble @2-11-19- 6:67PM E -Mail #1 B.R CMV 1,2,3,16 demcoKill # B.R. CMV 4,5,6.HCR Kill,IBOP #3 BY CMV 7,8,9,#2 Manual Kill ,Lower Kelly ValveTD #4 Super CH,Manual CH .#5 B.R CMV 10,11,HCR Kill w/Floor dart valve #6 B.R CMV 12,13, TIW valve # 7 Annular,CMV 15,12,13 #8 UPR CMV #9 UPR HCR choke ,#10 UPR Manual Choke #11 Lower P.R. and #11 Koomey Test Due to metal in ram cavities, change out Blind Ram element top seal on Drillers side while pressure testing choke manifold. 2/12/2019 2/12/2019 1.00 COMPZN RPCOMP RURD P Pull wear bushing and lay out, lay out 0.0 0.0 11:00 12:00 test joint, test alarms system, and clear and dean rig floor. 2/12/2019 2112/2019 1.00 COMPZN RPCOMP RURD P P/U wear bushing running tool and set 0.0 0.0 12:00 13:00 wear bushing and run in lock down screws. UD assembly, clear and clean dg floor and prepare to PIU and RIH with DP picking up from pipe shed. 2/12/2019 2/13/2019 11.00 COMPZN RPCOMP TRIP P P/U Mule Shoe and RIH picking up DP 0.0 0.0 13:00 0000 singles out of pipe shed to 1600', POOH racking back DP.Repeat 4X 2/13/2019 2/13!2019 3.00 COMPZN RPCOMP PULD P Finish RIH picking up OP singles out 0.0 0.0 00:00 03:00 of pipe shed to 1600', POOH racking back DP.Repeat 4 X 2/132019 2/13/2019 3.00 COMPZN RPCOMP BHAH P P/U and M/U 6 1/8" Mill Tooth Bit Re- 0.0 0.0 03:00 06:00 Run, bit sub and 4-3/4" D,C, BHA #94 and P/U the last 42 joints DP f/ pipe shed and RIH to 1628'. 2113/2019 2/1312019 1.00 COMPZN RPCOMP WASH P M/U TDS and break circulation, pick 0.0 0.0 06:00 07:00 up and record parameters, P/U 60k SIO 58k, 400 gpm at 880 psi, 35 rpm 1,100 fl/fibs, bs, RIH washing and reaming down from 1628' and take 1k bobbles in green cement top at 1655'. 2/132019 2/13/2019 1.00 COMPZN RPCOMP COCF P Continue washing and reaming in the 0.0 0.0 07:00 08:00 hole from 1655'to 1733', P/U 60k SID 58k, 400 gpm at 880 psi, 35 rpm 1,100 to 1,400 fUlbs. Drill hard cement with 1 -2k WOB from 1733' to 1734' and drill plug with 5-6k WOB from 1734' to 1734.7' and drill stage tool aluminum with 2-6k WOB from 1734.7' to 1735.4' and break through slacking off washing and reaming down to 1737' and taking 5k WOB, ream through down to 1739' with slick and clean parameters. Page 30138 Report Printed: 212112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time Our (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth MKB) End Depth (ftKB) 2/13/2019 2/13/2019 1.00 COMPZN RPCOMP WASH P PIU from 1739' back reaming and 0.0 0.0 08:00 09:00 washing to 1628' and back to 1739' three limes, slick and clear through stage tool. Continue to RIH PIU 60k SIO 58k, 400 gpm at 880 psi, 35 rpm 1,100 ft/lbs from 1739'to 1810' and take 5k tag up, work up and back down in an attempt to move obstruction down hole, solid with 5k Pet down. 2/13/2019 2/13/2019 1.50 COMPZN RPCOMP MILL P Mill on plug and shift tool material at 0.0 0.0 0900 1030 1810' down to 1813' with 1-1 Ok WOB P/U 60k S/O 58k, 400 gpm at 880 psi, 35 rpm 1,100 - 1,500 f 1lbs, working up through several times and continued varying parameters in an attempt to drill/mill through obstruction. From 1810' to 1811' there was rubber plug material coming back, from 1811'to 1813'there was aluminum coming over shakers and still trace cement fines. 2/13/2019 2/13/2019 0.50 COMPZN RPCOMP WASH P Wash down from 1813'to 1844' with 0.0 0.0 10:30 11:00 only a few bobbles on weight, wash and ream down to top of sand from 1844' down to 1848' and pick up to 1840' and circulate bottoms up at 400 gpm. 2/13/2019 2/13/2019 0.50 COMPZN RPCOMP CIRC P At 1840', circulate hole clean with 400 0.0 0.0 11:00 11:30 gpm at 1,200 psi, good returns of frac sand over shakers with good metal shavings, shaker's clean on bottoms up. 2/13/2019 2/13/2019 1.00 COMPZN RPCOMP RURD P Pull up and break stand and rack 0.0 0.0 11:30 12:30 back, blow down Kelly and lines. Rig up head pin in string and break circulation through string. 2/13/2019 2/13/2019 1.00 COMPZN RPCOMP PRTS P Close UPR on 3-1/2" DP, pumping 0.0 0.0 12:30 13:30 down kill line and string, pressure up 7" 26# L-80 casing with bit at 1813' to 2,500 psi at 0.25 bpm and hold for 30 minutes pressure end at 2,450 psi. 1.25 bbls pumped, bled back 1.25 bbls to 0 psi. Good Test. 2/13/2019 2/13/2019 0.50 COMPZN RPCOMP RURD P Open UPR, rig down surface lines, 0.0 0.0 13:30 14:00 blow down lines, prepare to POOH. Note: PJSM with derrick man, -50° with wind chill, risk assessment concluded heater in shelter is sufficient t0 keep derrick man warm, tripping out of the hole speeds slow enough to give derrick man 3 minutes to warm up with only 3 minutes out side to rack back each stand. 2/13/2019 2/13/2019 2.00 COMPZN RPCOMP TRIP P POOH with BHA #94 clean out bit 0.0 0.0 14:00 16:00 assembly from 1813' to surface racking back stands and DC's. 2/13/2019 2/13/2019 0.50 COMPZN BHAH P B/D and UD BHA #94 clean out 0.0 0.0 16:00 16:30 assembly and P/U and M/U BHA#95 JRPCOMP Baker Reverse Junk Baskel assembly and RIH. Page 31138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log StaM1 Time End Time Dur (hr) PhewOp cwe Activity Code Time P-T-X Operation Start Depth (Aka) End Depth (flKB) 2/13/2019 2/13/2019 4.00 COMPZN RPCOMP TRIP P RIH with BHA#95 RJB assembly to 0.0 0.0 16:30 20:30 1846' and M/U TDS and record parameters, P/U 60k S/O 58k, 400 gpm at 880 psi. Attempt Reverse Junk in basket wash F/ 1846"1850 No Go set down 10K POOH @ 1638 over pull 40K 2/13/2019 2/13/2019 2.00 COMPZN RPCOMP JAR T Continue Working string PUW 60K 0.0 0.0 20:30 22:30 SOW 30K Attempt to Tq and jar Through tight spot @ 1638' No movement Set Jar off F/ 40K over t/ 75 over No go slump and Tq No go Decision was made to make Blind Back off work Tq down up V 7500 V 10000 Ib Back off @ 10000 5 turns PUW @ 60K. Break TDS and prepare for DROPS inspection. 2/13/2019 2/14/2019 1.50 COMPZN RPCOMP TRIP T Hold derrick Inspection due to jarring 0.0 0.0 22:30 00:00 Continue POOH stand back work- string and Ckecking All Connections 2/14/2019 2/14/2019 3.00 COMPZN RPCOMP TRIP T POOH with backed off pipe and 0.0 0.0 00:00 03:00 observe good back off at 3-1/2" IF Connection at Junk Mill Basket, set back BHA#96 2/14/2019 2/14/2019 1.00 COMPZN RPCOMP BHAH T P/U and M/U double acting drilling 0.0 0.0 03:00 04:00 Jars and 9 more 4-3/4" DCs and RIH with BHA#97 2/14/2019 2/14/2019 2.00 COMPZN RPCOMP TRIP T RIH with BHA#97 and engage top of 0.0 0.0 04:00 06:00 fish at 1630' and screw into the fish with 6 turns to the right at 5,600 ft/lbs torque with 1/2 tum back, P/U and observe fully engaged into the fish. Note: PJSM with derrick man, -52° with wind chill, risk assessment concluded heater in shelter is sufficient to keep derrick man warm, tripping out of the hole speeds slow enough to give derrick man 3 minutes to warm up with only 3 minutes out side to rack back each stand. 2/14/2019 2/14/2019 5.00 COMPZN RPCOMP JAR T Jar on fish attempting to hit jars down, 0.0 0.0 06:00 11:00 unsuccessfully. Attempted 10 times to get jars to fire up and down, warming them up with 100k overpull and 50k set down, Weatherford Jars set* HT54106-IV. Prepare to POOH while ordering mechanical jars and surface jars. 2/1412019 2/14/2019 2.00 COMPZN RPCOMP TRIP T Perform mechanical back off, 6.25 0.0 0.0 11:00 13:00 turns to the left with .25 turns back, P/U and observe free from fish. POOH with BHA #97 2/14/2019 2/14/2019 1.00 COMPZN RPCOMP BHAH T BIO and L/D BHA#97, lay down 0.0 0.0 13:00 14:00 Weatherford jars and prepare to pick up BHA #98 2/14/2019 2/14/2019 8.00 COMPZN RPCOMP SVRG T Service rig, clear and clean rig floor, 0.0 0.0 14:00 22:00 perform PMs, and lay out completion string in pipe shed, drift, strap, and tally while waiting on Jars and intensifiers. 2/14/2019 2/15/2019 2.00 COMPZN RPCOMP SHAH T M/U and Strap BHA#98 With New 0.0 0.0 22:00 00:00 Drilling Jars RIH w/ 3-1/2" HT38 workstdng T/ top fish @ 1633' Page 32138 Report Printed: 2/2112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Depth Stan Time End Time our (hr) Phase Op Dose Activity Code Time P -T-% Operation (eKB) End Depth (WS) 2/15/2019 2115/2019 2.00 COMPZN RPCOMP TRIP T RIH w/ 3-1/2" HT38 DP workstring T/ 0.0 0.0 00:00 02:00 top fish @ 1633' 2/1512019 2/15/2019 2.00 COMPZN RPCOMP JAR T Tag Fish @ 1633 Screw in to fish 0.0 0.0 02:00 04:00 PUW 62K SOW 60K Attempt to jar fish free NO GO Drilling Jars NO GO and used Baker Bumper sub to Attempt to jar down, No go Back off fish, POOH. 2/15/2019 2/15/2019 1.00 COMPZN RPCOMP BHAH T UD Weatherford Jars and BHA#98 0.0 0.0 04:00 05:00 and M/U BHA#99 with screw-in sub, accelerator, bumper sub and RIH. 211512019 2/15/2019 1.00 COMPZN RPCOMP TRIP T RIH to 1620' and space out string to 0.0 0.0 05:00 06:00 1 1 1 make up surface jars. 2115/2019 2/15/2019 1.00 COMPZN RPCOMP BHAH T PJSM, Make up surface jars and cross 0.0 0.0 06:00 07:00 1 -over's and set surface jars for I 00 over release weight. 2/15/2019 2/1512019 1.00 COMPZN RPCOMP JAR T Slack off and engage fish at 1633' and 0.0 0.0 07:00 08:00 screw into fish with 4k torque 6 turns to the right. Pick up 100k over and surface jars released freeing fish, only stroked jars once. Engage rotary at 20 rpm with 1,000 ft/lbs torque, pipe free. 2/15/2019 211512019 1.00 COMPZN RPCOMP CIRC T Circulate at 1640' and pump 20 bbl Hi- 0.0 0.0 08:00 09:00 Vis sweep, only metal shavings and some cement over shakers, shakers dean up after sweep. 2/15/2019 2/15/2019 4.00 COMPZN RPCOMP TRIP T Blow down Kelly. POOH from 1640' 0.0 0.0 09:00 13:00 slow, hole slick from 1640'to 1290' and lake 1 O over pull, work back down with 5k to free down, attempt to pull up with same. P/U single joint of DP and M/U TDS, engage rotary at 20 rpm at 3,000 Mbs and stalled rotary, slack down with 5k and free rotary and pipe, circulate 200gpm and work spot three limes, slick. Blow down Kelly and continue POOH on the hook from 1290' to surface, aluminum found on RJB and 6" long piece of aluminum from stage tool sleeve retrieved in basket. 2/15/2019 2/15/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD RJB and fishing 0.0 0.0 13:00 13:30 assembly BHA #99 2115/2019 2/15/2019 0.50 COMPZN RPCOMP SVRG P Rig service, service TDS and rig, clear 0.0 0.0 13:30 14:00 and clean rig floor. 2/1512019 2/15/2019 1.50 COMPZN RPCOMP BHAH P P/U and M/U BHA#100, 6-1/8" junk 0.0 0.0 14:00 15:30 mill and 6-1/8" string mill and RIH with BHA#100 to millldrift cement stage tool and dress junk on top of sand at 1848'. 2/15/2019 2/15/2019 1.50 COMPZN RPCOMP TRIP P RIH with BHA#100 0.0 0.0 15:30 17:00 2/1512019 2/15/2019 2.50 COMPZN RPCOMP WASH P PUW 64k SOW 60K ROT 62k Wash 0.0 0.0 17:00 19:30 and ream F/1630' V1861' Mill up junk F/ 1851 t/1858' Milling on Junk and sand Pick off bottom and CBU @ 9 bbls wl 1700 PSI POOH 2/1512019 2/15/2019 2.00 COMPZN RPCOMP BHAH P Clean Magnets off and Check mill All 0.0 0.0 19:30 21:30 good M/U BHA# 101 w/Bakerjunk Reverse basket. 2/15/2019 2/16/2019 2.50 COMPZN RPCOMP TRIP P RIH w/ 3-1/2" HT38 D.P Work string 0.0 0.0 21:30 00:00 1 1 F/ 340'T/ 1858' Page 33/38 Report Printed: 2121/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (NCB) End Depth (MB) 2/16/2019 2/16/2019 1.00 COMPZN RPCOMP WASH P Reaming and wash down 0.0 0.0 00:00 01:00 F/18587/1865 w/ baker reverse Basket PUW 65K SOW 62k ROT 62K 8 BBL w1720 PSI, good sand returns to shakers, circulate until clean. B/D TDS and blow down Kelly. Prepare to POOH. 2/16/2019 2/16/2019 1.00 COMPZN RPCOMP TRIP P POOH with BHA#101 to surfacefrom 0.0 0.0 01:00 02:00 1864'. 2/16/2019 2116/2019 0.50 COMPZN RPCOMP BHAH P Clean out reverse basket, boot 0.0 0.0 02:00 02:30 baskets, and Magnet10 Ib on magnet and reverse basket 7 small pieces and chunk of aluminum and a few brass pieces. 2/16/2019 2/16/2019 0.50 COMPZN RPCOMP BHAH P M/U BHA #102 with same RJB, 2 x 0.0 0.0 02:30 03:00 boot baskets, and 1 magnet and RIH. 2/16/2019 2/1612019 1.50 COMPZN RPCOMP TRIP P RIH with BHA#102 from surface to 0.0 0.0 03:00 04:30 1860' and establish parameters. 2/16/2019 2116/2019 1.00 COMPZN RPCOMP WASH P Reaming and wash down F/1860' 0.0 0.0 04:30 05:30 T/1873' w/ baker reverse Basket PUW 65K SOW 62k ROT 62K 8 BBL wl720 PSI, good sand with a lot of metal and aluminum shavings seen at shakers, pumped a 20 bbl Hi -Ys sweep out of hole. 2/16/2019 2/16/2019 2.00 COMPZN RPCOMP TRIP P BID TOS and blow down Kelly. POOH 0.0 0.0 05:30 0730 from 1873'to surface. 2116/2019 2/16/2019 1.00 COMPZN RPCOMP BHAH P Clean out reverse basket, boot 0.0 0.0 07:30 08:30 baskets, and Magnell0 Ib on magnet and reverse basket 7 small pieces and chunk of aluminum and a few brass pieces and recovered knive blade from Baker casing cutter. 2/16/2019 2/16/2019 0.50 COMPZN RPCOMP BHAH P M/U BHA#103 with same RJB, 2 x 0.0 0.0 08:30 09:00 boot baskets, and 1 magnet and RIH. 2116/2019 2/16/2019 2.00 COMPZN RPCOMP TRIP P RIH with BHA#103 from surface to 0.0 0.0 09:00 11:00 1870' and establish parameters. 2116/2019 2/16/2019 2.50 COMPZN RPCOMP WASH P Reaming and wash down F/1870' 0.0 0.0 11:00 13:30 T/1940' w/ baker reverse Basket PUW 65K SOW 62k ROT 62K 8 BBL wl720 PSI, good sand with a lot of metal and aluminum shavings seen at shakers, pumped a 20 bbl Hi -Vis sweep out of hole. 2/16/2019 2/16/2019 2.00 COMPZN RPCOMP TRIP P B/D TDS and blow down Kelly. POOH 0.0 0.0 13:30 15:30 from 1940' to surface. 2/1612019 2/16/2019 0.50 COMPZN RPCOMP BHAH P Clean out reverse basket, boot 0.0 0.0 15:30 16:00 baskets, and Magnetl Ib on magnet and reverse basket. very little tiny metal shavings in baskets. 2/16/2019 2/16/2019 1.00 COMPZN RPCOMP SHAH P BID and UD BHA#103 and PIU and 0.0 0.0 16:00 17:00 M/U BHA#104 with overshot assembly for pulling IBP and RIH. 2/16/2019 2/16/2019 2.00 COMPZN RPCOMP TRIP P RIH with BHA#104 from surface to 0.0 0.0 17:00 19:00 1 1 11935'and record parameters. 2/16/2019 2/16/2019 1.50 COMPZN RPCOMP WASH P Wash down from 1935' to 1969' 0.0 0.0 19:00 20:30 washing sand and engaging IBP fishing neck, set down and equalize IBP. 2/16/2019 2/16/2019 0.50 COMPZN RPCOMP OWFF P Observe well for flow, well static, allow 0.0 0.0 20:30 21:00 IBP to relax before pulling up out of the hole. 2116/2019 2/16/2019 2.00 COMPZN RPCOMP TRIP P BID TDS, blow down Kelly and POOH 0.0 0.0 21:00 23:00 with IBP on overshot assembly Page 34138 Report Printed: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Depth Stan Time End Time Our (hr) Phase Op Code A ivly Code Time P -T -X Operadon (KKB) End Depen(ftKB) 2/16/2019 2/17/2019 1.00 COMPZN RPCOMP BHAH P B/D and UD BHA#104 and IBP and 0.0 0.0 23:00 00:00 lay out. P/U and MIU BHA#105 with Baker Overshot dressed with 4-9/16" grapple to RIH and engage 3-1/2" completion string fish. 2/17/2019 2117/2019 1.50 COMPZN RPCOMP TRIP P RIH with BHA#105 from 25'to 1917' 0.0 0.0 00:00 01:30 and M/U TDS and break circulation. 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP FISH T PUW 60K SOW 58K pump rate @ 5 0.0 0.0 01:30 02:30 bbl min w/ 250 psi. Attempt to engage fish at 1983' w/ baker short catch over shot. Attempted 3 times without success. Observe well for flow and Blow DownTDS. Prepare to POOH to inspect overshot. 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP TRIP T POOH from 1983' with BHA#105 and 0.0 0.0 02:30 03:30 stand back 3-1/2" work -string, inspect overshot, observe engaging the fish with wear marks but grapples did not engage. 2/17/2019 2/17/2019 0.50 COMPZN RPCOMP SHAH T UD BHA#105 with short catch 0.0 0.0 03:30 04:00 overshot and PIU short spear (18"to shoulder) and RIH with BHA #106. 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP TRIP T RIH with BHA#106 from 25to 1983'. 0.0 0.0 04:00 05:00 1 1 1 M/U TDS and record parameters. 2/17/2019 2/17/2019 0.50 COMPZN RPCOMP FISH T PUW 60K SOW 58K pump rate @ 5 0.0 0.0 05:00 05:30 bbl min w/ 250 psi. Attempt to engage fish at 1983'w/ baker short spear and observe fish engaged with 10k down on 2nd attempt. Pick up to 20k overpull and observe jars fire and fish dropped off of spear. Attempted 3 times without success. Observe well for flow. Blow DownTDS. Prepare to POOH to inspect spear. 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP TRIP T POOH from 1983' with BHA #106 and 0.0 0.0 05:30 06:30 stand back 3-1/2" work -string, inspect spear, observe engaging the fish with wear marks but notice fish was bottoming out on spear's shoulder with only leading edge of grapple engaged. 2/17/2019 2/17/2019 0.50 COMPZN RPCOMP BHAH T B/D and UD BHA#106 and P/U and 0.0 0.0 06:30 07:00 M/U long spear assembly (24" to spear shoulder) and RIH with BHA #107 to 25'. 2/17/2019 2/17/2019 0.50 COMPZN RPCOMP SVRG T PJSM, service rig and TDS. 0.0 0.0 07:00 07:30 2/17/2019 2/17/2019 1.50 COMPZN RPCOMP TRIP T RIH with BHA#107 from 25'to 1983'. 0.0 0.0 07:30 09:00 M/U TDS and record parameters. 2/17/2019 2/17/2019 0.50 COMPZN RPCOMP FISH P PUW 60K SOW 58K. Engage fish at 0.0 0.0 09:00 09:30 1983' and swallow to 11985'w/ baker long spear and observe fish engaged with 5k down, pick up to 20k over and allow jars to bleed off, pick up to 11 Ok PUW with 50k overpull equaling estimated fish weight. 2/1712019 2/17/2019 1.50 COMPZN RPCOMP TRIP P POOH with fish on BHA#107 racking 0.0 0.0 09:30 11:00 back 3-1/2" DP from 1985' spear depth to surface, fish engaged to spear shoulder (Fish neck on GLM measured at 4.25" instead of 4.36" as per SLB fishing diagram). Page 35/36 Report Printed: 212112019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time our (hr) Phase Op Code Activity Code Time P-T-% Operation Start Depth (ftKB) Entl Depth(ftKB) 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP SHAH P PJSM, rig up double stack power 0.0 0.0 11:00 12:00 tongs, B/D and L/D fishing BHA#107 and break pup joint below GLM #6 and lay out, lay fishing tools and prepare to POOH with 3-1/2" completions string. 2/17/2019 2/17/2019 10.00 COMPZN RPCOMP PULL P POOH with 3-1/2" completions from 0.0 0.0 12:00 2200 7740' bottom cut depth laying out tubing and GLMs and strapping tubing before laying outside to lay down area. 2/17/2019 2/17/2019 1.00 COMPZN RPCOMP RURD P PJSM, rig down tubing tongs, clear 0.0 0.0 22:00 2300 and clean rig floor. Prepare to pick up casing scraper and clean out BHA. 2/17/2019 2/18/2019 1.00 COMPZN RPCOMP SHAH P PJSM, P/U and M/U Baker clean out D.D 0.0 23:00 00:00 assembly BHA#107 with polish mill and casing scraper w/magnet and RIH to 50'. 2/18/2019 2/18/2019 1.50 COMPZN RPCOMP BHAH P PJSM, P/U and M/U Baker clean out 0.0 0.0 00:00 01:30 assembly BHA#107 with polish mill and casing scraper w/magnet and RIH to 50'. 2/18/2019 2/18/2019 7.00 COMPZN RPCOMP TRIP P RIH with BHA#107 on 3-1/2" HT38 0.0 0.0 01:30 0830 Work- string to 9,702'. P/U single joint drill pipe, M/U TDS. 2/18/2019 2/18/2019 1.50 COMPZN RPCOMP WASH P Break circulation at 9,702'. P/U 125k 0.0 0.0 08:30 1000 S/O 90k RAN 124k, 2bpm at 440 psi 42 rpm at 8,300 ft/Ibs torque. Stop rotary and wash down to top of stump and tag up at 9,714.2', pick up and engage rotary and polish/mill/wash over 7" stump w/ 3bpm at 660 psi and 43 rpm with torque increasing to 9,100 ft/Ibs as inner mill engaged 7" casing. Dress/palish/mill/wash down from 9,714.2' to 9,719.2' with 42 rpm at 8,300 to 10,300 ft/Ibs and observe 7k WOB indicating tag up on top of fish with lip mill. P/U back reaming from 9,7192to 9,700' and stop rotary and slack off down to 9,721.2' and set 10k down. (Top of dressed off 7" cut is at 9,7145). P/U to 9,705' and circulate bottoms up with 9 bpm at 3,145 psi. 2/18/2019 2/18/2019 1.00 COMPZN RPCOMP CIRC P Circulate bottoms up at 9,705' with 9 0.0 0.0 10:00 11:00 bpm at 3,145 psi. Shakers clean on bottoms up, observed some scale, sand, and small metal flings. 2/18/2019 2/18/2019 0.50 COMPZN RPCOMP TRIP P POOH from 9,705'to 9,647' and rack 0.0 0.0 11:00 11:30 stand back. M/U TDS and break circulation recording parameters. 2/18/2019 2/18/2019 0.50 COMPZN RPCOMP WASH P Break circulation at 9,646', P/U 125k 0.0 0.0 11:30 12:00 S/O 90k RNV 124k, 5 bpm at 1,440 psi 42 rpm at 8,300 ft/Ibs torque. Work casing scraper across packer setting depth from 9,646' to 9,595' rotating and reciprocating 5 times. Circulate bottoms up at 9.646'. 2/18/2019 2/18/2019 1.00 COMPZN RPCOMP CIRC P lCirculate bottoms up at 9,646" with 9 0.0 0.0 12:00 13:00 bpm at 3,145 psi. Shakers clean on bottoms up, observed some scale and small metal flings. 2/18/2019 2/18/2019 10.00 COMPZN RPCOMP TRIP P POOH L/D 3 1/2" HT 38 Work string 0.0 0.0 13:00 2300 from 9,647' to 347' Set up t/ Cut and slip D/L Page 36/38 ReportPrinted: 2/21/2019 Operations Summary (with Timelog Depths) 2T-22 Rig: NABORS SES Job: RECOMPLETION Time Log I $fart Depth Start Time EM Time Dur(hr) Phase Op Code Activity Code Time P -T-% Operation (ftKB) End Depth(WEI) 2/18/2019 2/19/2019 1.00 COMPZN RPEQPT SLPC P Slip and Cut Drilling Line 79'179' 0.0 0.0 23:00 00:00 2/19/2019 2/19/2019 1.00 COMPZN RPCOMP PULD P Continue UD 3 1/2" HT 38 D.P Work - 0.0 00:00 01:00 String 2/19/2019 2/19/2019 3.50 COMPZN RPCOMP BHAH P UD Baker BHA and 4 3/4" D.C. UD 01:00 04:30 All Baker Tools F/ Rig Floor and Pulled Wear Ring Bushing Flush BOP Slack RID Flush joint 2/19/2019 2/20/2019 19.50 COMPZN RPCOMP RCST P R/U 3 1/2" HYD -563 Tubing 04:30 00:00 Equipment M/U 3 1/2" HYD 563 as per tally w/ Baker Non seal Overshot M/U Tq 2900 Nlbs Continue running 3 1/2" completion string, tag tubing stub on depth at 9714', set down and swallowed 2.85', observed shear pins shear 11 K. 2/20/2019 2/20/2019 1.00 COMPZN RPCOMP RCST P Tag tubing stub, set down 20k to 00:00 01:00 confine, PU saw 20K drag, popped off when got off tubing stub. Tag twice and mark for space out each time seeing drag. PU above stub, prep to circulate. 2/20/2019 2/20/2019 2.00 COMPZN RPCOMP CRIH P Pump 268bbi corrosion inhibited 01:00 03:00 9.3ppg brine, displace with 10bbi 9.3ppg brine from pits. 2/20/2019 2/20/2019 0.50 COMPZN RPCOMP PACK P Drop 1 5/16" ball and rod, wait for it to 03:00 03:30 fall. Pressure up on tubing to 2200psi then 3000psi to set production packer. PU, sheared out PBR with 20K over. Packer set at 9628'. 2/20/2019 2/202019 2.00 COMPZN RPCOMP RCST P Space out, PU three pups, PU tubing 03:30 05:30 hanger and landing joint. Land out tubing. Run in LDS 220/2019 2/20/2019 2.50 COMPZN RPCOMP PRTS P RU to pressure test tubing and IA. 05:30 08:00 Pressure up tubing to 3000 psi, chart test for 5 mins. Pressure test good. Bleed down tubing pressure to 1500 psi. Pressure up the IAto 2500 psi. Chart test for 30 mins, test good. Bleed tubing pressure down to 0 psi while maintaining 2500 psi on IA. SOV did not shear open. Pump on IA to increase differential pressure, SOV sheared open at 2900 psi. Rig down circulating equipment. Blow down surface lines and lay out landing joint. 2/20/2019 2/202019 0.50 COMPZN RPCOMP OTHR P Install BPV Pressure lest BPV to 08:00 08:30 1000 psi for 5 mins. Test good. 2/20/2019 2/20/2019 2.00 COMPZN RPCOMP NUND P Remove riser and riser adapter. 08:30 10:30 Nipple down BOP stack. Remove choke hose from BOP slack. Remove DSA. 2/20/2019 2/20/2019 2.00 COMPZN RPCOMP NUND P Clean hanger profile and install tree 10:30 12:30 adapter. Nipple up FMC Gen IV 3- 1/8" 5M production tree. 2/20/2019 2/20/2019 1.50 COMPZN RPCOMP PRTS P Pressure lest wellhead packoff to 250 12:30 14:00 psi low for 5 mins and 5000 psi high for 10 mins. No visual leaks, pressure test good. 2/20/2019 2/20/2019 0.50 COMPZN RPCOMP OTHR P Pull BPV and install tree test plug. 14:00 14:30 2/20/2019 2/2012019 0.50 COMPZN RPCOMP PRTS P Pressure test tree to 250 psi low for 5 14:30 15:00 mins and 5000 psi high for 10 mins. Test good. Page 37138 Report Printed: 2121/2019 Operations Summary (with Timelog Depths) qW 2T-22 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time our (hr) Phase On Code Activity Code Time P-T-X Operation Stan Depth (fiKB) End Depth(flKB) 2/20/2019 2/20/2019 0.50 COMPZN RPCOMP OTHR P Pull tree test plug. 15:00 1530 2/20/2019 2/20/2019 3.50 COMPZN RPCOMP FRZP P Rig up surface lines to production tree 15:30 19:00 to take returns to flow back tank and freeze protect well. Rig up LRS to tree and pump 80 bbls of diesel at 2 bpm at 950 psi. Taking returns to flow back tank. Allow well to U- tube/equalize tubing with IA. 2/20/2019 2/20/2019 1.00 COMPZN RPCOMP MPSP P M/U FMC dry rod and RIH w/ FMC 19:00 2000 BPV and set Secure well R/D release Rig F/ 2T-22 T/ 2T-218 @ 20:00hrs. Page 38138 Report Printed: 2/21/2019 1950 856 30375 WELL LOG TRANSMITTAL #905425682 To: Alaska Oil and Gas Conservation Comm. February 13, 2019 Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Multi Finger Caliper: 2T-22 Run Date: 1/20/2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS—ANC@halliburton.com 2T-22 Digital Data (LAS), Digital Log file, Casing Inspection Re ort, 3D Viewer 1 CD Rom 50-103-20224-00 RECEIVE D FEB 19 2019 A®GCC PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com Date: gll l / l 61? Signed: ORIGINATED ALASKA E -LINE SERVICES 42260 Kenai Spur Hwy PO BOX 1481 - Kenai, Alaska 99611 PH: (907) 283-7374 FAX: (907) 283-7378 DELIVERABLE DESCRIPTION RECEIVED Kuparuk FEB 192019 19 50 86 AOGCC 50363 BP North Slope 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids 900 E. Benson Blbd. - Anchorage, AK 99508 USPS Tracking # Conoco Phillips Alaska Inc. 1 0 0 Attn: NSK-69 700 G Street Anchorage, Alaska 99501 USPS Tracking # n/a AOGCC 0 0 1 ATTN: Natural Resources Technician II Alaska Oil & Gas Conservation Commision 333 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539 USPS Tracking # 9405 5036 9930 0417 5293 91 DNR L 0 0 1 Attn: Garrett Brown -Geologist I DNR, Division of Oil & Gas 550 West 7th Ave, Suite #1100 =Anchorage, AK 99501 USPS Tracking # 9405 5036 9930 0417 5293 84 Prim Name( ! Signatures " Please return via e-mail a copy to both Alaska E -Line Services and Conoco Phillips Alaska: tom.osterkamp@conocophillii)s.com reception@ake-line.com ORIGINATED ALASKA E -LINE SERVICES 42260 Kenai Spur Hwy PO BOX 1481 - Kenai, Alaska 99611 PH: (907) 283-7374 FAX: (907) 283-7378 DELIVERABLE DESCRIPTION 2664 3H-05 2665 2T-22 2666 2T-22 2671 2K-26 TRANSMITTAL D'2/13/2019 TRANSMITTAL #: � 02132019 RECEIVED Kuparuk FEB 19 2019 19 50 0 6 AOGCC 30 3 6 4 SU -029-20077-00 CCL -Final Field 50-103-20224-00 CCL -Final Field 50-103-20224-00 CCL -Final Field 50-103-20126-00 CCL -Final Field 1/9/2019 1/18/201'. 2/3/2019 BP North Slope 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids 900 E. Benson Blbd. - Anchorage, AK 99508 USPS Tracking # Conoco Phillips Alaska Inc. 1 0 0 Attn: NSK-69 700 G Street Anchorage, Alaska 99501 USPS Tracking # n/a I31 AOGCC 0 0 TTN: Natural Resources Technician II laska Oil & Gas Conservation Commision 33 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539 USPS Tracking # 9405 5036 9930 0417 5293 91 DNR 0 0 1 Attn: Garrett Brown -Geologist I DNR, Division of Oil & Gas 550 West 7th Ave, Suite #1100 - Anchorage, AK 99501 USPS Tracking # 9405 5036 9930 0417 5293 84 Date Please return via e-mail a copy to both Alaska E -Line Services and Conoco Phillips Alaska: Pro Loepp, Victoria T (DOA) From: Ward, Dusty K <Dusty.Ward@conocophillips.com> Sent: Thursday, February 7, 2019 4:49 PM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]Re: 2T-22 Procedure Change Follow Up Flag: Follow up Flag Status: Flagged Yes. Thanks. Dusty Ward Senior Wells Engineer Office: 907-265-6531 Cell: 503-476-2519 From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Sent: Thursday, February 7, 2019 4:48 PM To: Ward, Dusty K <Dusty.Ward@conocophillips.com> Subject: [EXTERNAL]Re: 2T-22 Procedure Change Will you be testing the VBRs after install? Victoria Sent from my iPhone On Feb 7, 2019, at 1:54 PM, Ward, Dusty K <Dusty.Ward@conocophillips.com> wrote: Victoria, Hope this finds you well. On 2T-22 subsidence RWO procedure with 7ES, I wanted to communicate two updates as an FYI. The well is progressing, and we've pulled the subsided 7" casing portion, and we've cleaned up most our drift to run new 7" casing! We're getting ready to re -run our 7" casing to tie back into our cut (^'1750') and then will move forward with the cement procedure to cement the 7" in place. A change to the cement procedure: - We will use an HES II cement valve instead of an HMCV cement valve in our 7", and we will be closing the 7" fixed blinds as part of the cement procedure to force cement out of the OA valve (instead of up letting it come up the BOP stack) as a planned 'routine use' of the 7" fixed ram. - We will make sure the effectiveness of the element isn't compromised. (And we'll actually be changing out the 7" back to the 2-7/8" x 5.0" VBRs in the next step, because we'll be done working with our 7" casing after the cement job). Also, - the completion will now be primarily HYD 563 for the 7" casing and 3.5" completion instead of BTCM and EUE 8rd respectively. (Revised schematic attached.) 1 thought it prudent to overcommunicate versus under communicate for this minor change, so this will be a planned 'routine use' of the 7" BOP element. We won't be sending out any e-mail within 24 hours of the operation since it is planned 'routine use'. Thanks. Please reach out to me if you have any questions or concerns. Make it a great day. Dusty Ward Senior Wells Engineer Office: 907-265-6531 Cell: 503-476-2519 <2T-22 APPROVED 10-403 Pull Tubing, Repair Well, Alter Casing Sundry App.pdf> <2T-22 RWO Prop Schematic_REV1.pdf> KtEk zr-zz Regg, James B (DOA) From: Ward, Dusty K <Dusty.Ward@conocophillips.com> Sent: Tuesday, January 22, 2019 7:39 PM -q.. (Z�i To: DOA AOGCC Prudhoe Bay; Loepp, Victoria T (DOA) `1 Cc: Senden, R. Tyler; NSK RWO CoMan; Ward, Dusty K Subject: Notification of BOP use on Nabors 7ES on 1/22/2019 Attachments: 2T-22 BOPE Letter 1 22 2019.doc Victoria and to whom it may concern, Please see attached document in response to Bulletin 10-003 in order to document the use of BOP equipment on 2T-22. Please let me know if you have any questions. Dusty Ward Senior Wells Engineer Office: 907-265-6531 Cell: 503-476-2519 ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 Jan 22, 2019 AOGCC Industry Guidance Bulletin No. 10-003 Reporting BOPE Use to Prevent the Flow of Fluids from a Well Dear Commissioner: As per AOGCC Industry Guidance Bulletin No. 10-003, this letter is to follow up on BOPE usage on Nabors 7ES with a written report. ! ^� Time of BOPE Use: 1/22/2019 at 00:30 hours Well Location: 2T-22 ` API Number: 50-103-20224-00 PTD Number: 195-086 Rip Name: Nabors 7ES ' Operator Contact: Dusty Ward. (o) 907-265-6531. (c) 503-476-2519. Dusty. Ward@conocophillips.com Operations Summary: On 1/21/2019 at approximately 18:30, milling operations began on the 7" production casing because the casing was buckled due to subsidence and we were attempting to enlarge the drift through the buckled portion of the casing so that a casing cutter could be drifted below the buckled portion. While milling, the mill snapped off in the buckled casing and the remaining BHA was pulled to surface. Shortly after that time, diesel was noticed at surface, which indicated fluid communication from 7" casing to the 7" x 9-5/8" outer annulus (OA). Diesel Arctic pack in the OA is nominally a 7.2 ppg, while a 9.3 ppg brine was in the 7" casing. Once communication was made, the fluids started to swap and utube, which began to push diesel to the pits. At approximately 00:30 hours on 1/22/2019 the blind rams were Jo to prevent diesel from nothing to the pits. 9.3 ppg brine was pumped in the well to let swap with the diesel in the OA and returns were taken to a tank through the OA valve. Initial diesel returns were seen equal to the brine fluid put in the well. After some time a brine/diesel mixture was returning to the tank. Some entrained gas also appeared to break out of the diesel being displaced and was bled off. The operation of letting the fluids swap has continued throughout 1/22/2019, and the ratio of brine returning with diesel has continued to increase. Currently the OA and casing have both been bled off and held at 0 psig. We're waiting for a period to confirm the OA and casing are indeed balance. No fluid volume gains were realized through the operation. The blind ram will be retested once current operations of swapping out the diesel is complete. It will be tested to 250 psi and 2500 psi. BOPE Used: Blind Reason for HOPE Use: The blind ram was closed to determine to prevent utube diesel from entering the pits Actions To Be Taken: The blind ram will be retested once the current operation of swapping out the diesel and confirming no pressure on OA and casing is finished. If you have any questions or require any further information, please contact me at 265-6531. Sincerely, Dusty Ward Rig Workover Engineer CPAI Drilling and Wells i ConocoPhillips P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 July 16th, 2010 Commissioner Dan Seamount Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Commissioner Dan Seamount: • ~~~~rv~® ~1. ~~ €'~ 2010 A~~aska ~ & Gaz C~ C~pssion ~nclror~ge 195_080 a~~ as Enclosed please fmd a spreadsheet with a list of wells from the Kuparuk field (KRil). Each of these wells was found to have a void in the conductor. These voids were filled with corrosion inhibitor, engineered to prevent water~from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The corrosion inhibitor/sealant was pumped July 11th, 12th, 13th 2010. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions. Sincerely, Perry Klein ConocoPhillips Well Integrity Projects Supervisor • ConocoPhillips Alaska Inc. Surtace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Kuparuk Field Date 7!16/10 2T. 3H PAD r Well Name API # PTD # Initial top o cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al 2T 22 50903202240000 1950860 8" Na 8" Na 3.8 7/12/2010 2T-23 50103202160000 1950320 8" Na 8" n/a 2.1 7/12/2010 2T-27A 50103202170100 2090900 7" n/a 7" Na 1.7 7/12/2010 2T-32 50103202180000 1950490 36" n/a 36" Na 11.9 7/12/2010 2T-37 50103202270000 1951010 22" n/a 22" Na 2.5 7/11/2010 2T-38A 50103202290100 1972050 8" n/a 8" Na 1.7 7/11/2010 2T-203 50103205200000 2051970 22" Na 22" Na 5.1 7/13/2010 2T-208 50103205180000 2051870 13" n/a 15" n/a 2.5 7/13/2010 2T 210 50103202730000 1982030 18" n/a 18" n/a 5.1 7/12/2010 2T-217A 50103203340100 2000740 8" n/a 8" n/a 1.7 7/12/2010 3H-13A 50103200890100 1961970 SF n/a 22" n/a 3.8 7/11/2010 PHILLIPS Alaska, Inc. Subsidiary of PHILLIPS PETROLEUM COMPANY Post Office Box 100360 Anchorage, Alaska 99510-0360 M. Mooney Phone (907) 263-4574 Fax: (907) 265-6224 February 19, 2002 Commissioner Cammy Oechsli Taylor State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Subject: Report of Sundry Well Operations 2T-22 Dear Commissioner Oechsli Taylor: Phillips Alaska, Inc. submits the attached Report of Sundry Well Operations for the perforations on the KRU well 2T-22. If there are any questions, please contact me at 263-4574. Sincerely, M. Mooney Wells Team Leader Phillips Drilling MM/skad STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator Phillips Alaska, Inc. 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 4857' FNL, 4724' FEL, Sec. 1, T11N, R8E, UM 5. Type of Well: Development __X Exploratory __ Stratigraphic __ Service__ (asp's 498944, 5970401) 6. Datum elevation (DF or KB feet) RKB 122 feet 7. Unit or Property name Kuparuk Unit 8. Well number 2T-22 At top of productive interval 2265' FSL, 1155' FEL, Sec. 3, T11 N, R8E, UM At effective depth At total depth 2965' FNL, 1354' FEL, Sec. 3, T11N, R8E, UM (asp's 491754, 5972298) 9. Permit number / approval number 195-086 / 10. APl number 50-103-20224 11. Field / Pool Kuparuk Oil Pool 12. Present well condition summary Total depth: measured true vertical 10193 feet 6107 feet Effective depth: measured 9978 feet true vertical 5940 feet Casing Length Size CONDUCTOR 85' 16" SUR. CASING 3919' 9-5/8" PROD. CASING 10056' 7" Plugs (measured) Junk (measured) Cemented 225 sx AS 1 790 sx AS III, 640 sx Class G 210 sx Class G Measured Depth 85' 3958' 10183' True ve~icalDepth 85' 2882' 6099' Perforation depth: measured 9905'-9925',9954'-9970' true vertical 5884'-5899', 5922'-5934' l'ubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 Tbg @ 9793' MD. Packers & SSSV (type & measured depth) BAKER SABL-3 PERM. @ 9768' MD. CAMCO 'DS' NIPPLE NO GO @ 511' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Oil-Bbl 673 Representative Daily Averaqe Production or Iniection Data Gas-Mcr Water-Bbl 1348 98 712 1444 94 Casing Pressure Tubing Pressure 271 284 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Oil__ X Gas__ Suspended__ Service. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Carl Mike Mooney 263-4574 Signed Michael Mooned, Title Wells Team Leader Date Z.//~/~ Prepared b~/ Sharon Al~sup-Drake 263-4612 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE Date Comment 2T-22 Event History 01/09/02 01 / 17/02 TAGGED @ 9990' RKB, EST 65' OF RATHOLE. DRIFTED TBG W/2.62" X 20' HC TO 9990' RKB. [PERF, TAG] PERFORATED A2 SAND INTERVAL @ 9954'- 9970' W/2 1/2" HSD 6 SPF POWER JET 60 BEG PHASING, TAGGED TD AT 9978'. [PERF] Page 1 of I 2/13/2002 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 Ron Marquez Production Engineering Supervisor Kuparuk River Unit NSK 69 Phone 659-7226 Fax 659-7314 October 6, 1999 Mr. Robert N. Christenson, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Christenson' Attached in duplicate are Report of Sundry Approvals (Form 10-404) for the following Kuparuk wells: Well Action 2T-22 Stimulate 3F-18 Perforate 3F-18 Perforate 3H-15 -Perforate 3M-23 Stimulate RECEIVED OCT 2 ~ ~995) 0il & Gas Cons. c0mmissi0.n Anchorage If you have any questions, please call me at 276-1215, ext. 7226. Sincerely, ,I, ~- ~ Ron M~rque~ Kuparuk Production Engineering Supervisor ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany bcc; Central Files NSK Well Files ATO-320 NSK-69 (w/o cover) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate~X Plugging _ Perforate _ Pull tubing Alter casing Repair well _ Other _ 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development X. 41' RKB 13. Address: Exploratory_~. 7. Unit or Property: P.O. Box 100360 Stratagrapic__ Anchorage, AK 99510-0360 Service __ Kuparuk River Unit 4. Location of well at surface: 8. Well number: 417' FSL, 556' FWL, Sec 1, T11 N, R8E, UM 2T-22 Af top of productive interval: 9. Permit number/approval number: 2265' FSL, 1155' FEL, Sec 3, T11 N, R8E, UM 95-86 At effective depth: 10. APl number: 2298' FNL, 1293' FEL, Sec 3, T12N, R8E, UM 50-103-20224-00 At total depth: 11. Field/Pool: 2315' FSL, 1354' FEL, Sec 3, T11N, R8E, UM Kuparuk River Field / Oil Pool 12. Present well condition summary Total Depth: measured 10193 feet Plugs (measured) None true vertical 6107 feet Effective Depti measured 10093 feet Junk (measured) None true vertical 6029 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 85' 16" 225 Sx AS I 121' 121' Surface 3919' 9-5/8" 7906x AS III lead & 3958' 2882' 6406x Class G tail Production 10056' 7" 210 sx Class G 10183' 6099' Liner Perforation Depth measured g905' - gg25' true vertical 5884' - 5899' Tubing (size, grade, and measured depth) 00~- 3.5", 9.3 Ib/ft, L-80 @ 9793' . .~ Packer: Baker SABL-3 perm @ 9768'; No SSSV: Nipple @ 511' 13. Stimulation or cement squeeze summary Fracture stimulate "A" sand on 7/8/98. ,~'~l Intervals treated (measured) ..... ~.; ~., 9905'-9925' '-' -' ~ .~"' ~ , Treatment description including volumes used and final pressure Pumped 237,427 lbs of 20/40, 12/18 & 10/14 ceramic proppant into formation, fp was 5118 psi. 14. Representitive Daily Average Production or Injection Data Oii-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 881 686 108 1000 280 Subsequent to operation 1446 646 170 1149 257 15. Attachments MIT form 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _~X Oil _X Gas _ Suspended _ Service _ 17. I here. by certify that the foregoing is true and correct to the best of my knowledge. /L~t~,~;~-/-)j'~ Title: Production Engineering Supervisor Date Signed '""IIII"L I Form 10-404 r~ 5/88 SUBMIT IN DUPLIC~ Inc. (UPARUK RIVER UNIT ."LL SERVICE REPORT K1(2T-22(W4-6)) WELL JOB SCOPE JOB NUMBER 2T-22 FRAC, FRAC SUPPORT 0628981833.2 DATE DAILY WORK UNIT NUMBER 07/08/98 A SAND FRAC. FRAE; DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 4 i~ Yes (~ ,oI ® Yes (~ No DS-YOKUM RinGS FIELD AFC# CC# DALLY COST ACCUM COST Si;i~.~..~ ,ed,3/,~ .~ .,,/,,.... ESTI MATE K D2457 230DS28TL $139,227 $160,395 Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann ~ Initial Outer'Ann' I ~=in/al~7'e~r'~nn 0 PSI 160 PSI 1000 PSI 500 PSII 110 PSI I 225 PSI DALLY SUMMARY A SAND REFRAC PUMPED FRAC AS PER DESIGN @ 15 BPM AND AN AVG. PRESSURE OF 3450# USING 50# XL GW. COMPLETED THRU FLUSH (45 BBLS DIESEL PAST SWAB). PUMPED 237427 # OF PROPANT IN THE FORMATION W/427# PROPANT LEFT IN THE PIPE. PROPANT USED 20/40 12/18 10/14 WITH 14 PPG AT PERF'S [Frac-Refrac] TIME LOG ENTRY 08:30 MIRU DS EQUIPMENT HOLD SAFETY MEETING 17 PEOPLE ON LOCATION. PT LINES TO 10000# 09:00 PUMP BREAKDOWN W 50# XL GW @ 15 BPM. TBG PRESS@ 7114# AN PRESS @ 3439# PREFORM STEP DOW TEST. MONITOR PRESSURE. ISIP 1332# AN PRESS 2507 10:20 PUMPED DATA FRAC STARTING @ 5 BPM UP TO 15 BPM W/50# XL GW. AVG TBG. PRESSURE 3827#. SD MONITOR PRESSURE. 11:25 PUMPED 375 BBL PAD@ 15 BPM W/50# XL GW. @ 4770# TBG. PRESSURE. 12:06 PUMPED FRAC AS PER DESIGN @ 15 BPM AVG. PRESURE 3400# USING 50# XL GW PUMPED FLUSH AWAY. ISIP 1849# TOTAL PROP 237427 W 144fPPG AT PERFS:427# OF PROP IN PIPE 25' OF FILL. PUMPED 60 BBL DIESEL. 14:30 DOWELL STARTED TO RIG DOWN MOVE OFF. SERVICE COMPANY - SERVICE DAILY COST ACCUM TOTAL $0.00 $1,280.00 APC $5,000.00 $6,750.00 DOW ELL $132,227.74 $132,227.74 HALLIBURTON $0.00 $12,378.00 LITTLE RED $2,000.00 $7,760.00 TOTAL FIELD ESTIMATE $139,227.74 $160,395.74 P ERHIq' DATA T DikTA .... F'I,,US Da'[u; 07/0c-~/97'. tRUN DAI"E ...... RECVD 'n5 i0/J3/',, 95 .... 086 SUF.::VEY ~ 121~--i0i93 A N A D iq.:: I L. L /',.".! ,^. D F: l L L-- '1 08/' irs 19% l,~ 8 / ''~ q / q ~', .... ! 0 8/" z .u/ 3 5 95-~086 ,SDR ..p,~. i 0 193 -I+ 150 10~-,".t07 ,-.R'/;.OOMPL. ETZON DATE I '-~ 2 I O/ i 3/95 ~ /91 /¢f'/ /ox';O," Ar'e dr'y t:he DAI L"/ WELL d'¥t;ch samples ops R G;'/~,q~-/ Tc, $ St /clj'7 I~/"_~o/?~-'/'" r'equ'¥r'ed? yes ~And r'eceived? y e s .(~,.'*t "~ a 'l y s i s ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 25, 1995 Mr. David J. Johnston Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: 2T-22 (Permit No. 95-86) Well Completion Report Dear Mr. Commissioner: Enclosed is the well completion report for the recent operations on KRU 2T- 22. If there are any questions, please call 265-6206. Sincerely, Supervisor Kuparuk Drill Site Development MZ/skad STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM~v~ISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL ~] GAS ~'~ SUSPENDED ~ ABANDONED r~ SERVICE 2 Name of Operator ARCO Alaska, Inc 3 Address P.O. Box 100360, Anchoracje, AK 99510-0360 4 Location of well at surface 417' FSL, 556' FWL, Sec. 1, T11N, R8E, UM . At Top Producing Interval 2265' FSL, 1155' FEI_, Se(::. 3, TllN, R8E, UM At Total Depth · 2315' FSL, 1354' FEE Sec. 3, T11N, R8E, UM 5 Elevation in feet (indicate KB, DF, etc.) RKB 41' Pad 81' 12 Date Spudded June 16, 1995 17 Total Depth (MD+TVD) 10193' MD & 6107'TVD Permit Number 95-86 22 Type Electric or Other Logs Run 8 /'A?t Number ~' {i-~5¢1,03-20224 9 Unit.br~f_ea..4e Name KuparOE:R~v'er Unit 10 Well Number' 2T-22 Field and Pool KUPARUK RIVER Kuparuk River Oil Pool 6 Lease Designation and Serial No. ADL25568 ALK2666 ' June 24, 1995 31-Au~]-95 (Perf'd) NA feet MSLI 1 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost 10093' M D & 6029'MD YES [~ NO [~ NA feet MD ,, 1380'ss APPROX GR/CDR 23 CASING SIZE 7" 26.0# Surf. 24 Perforations o ~n to Production (MD+TVD of Top and Bottom and interval, size and number) 4 spf 9905' - 9925' MD 5884' - 5899"1'VD 27 Date First Production September 15, 1995 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD BTM HOLE SIZE CEMENT RECORD 121' 24" 225 SX AS I 3958' 12.25" 790 sx AS III Lead, 640 sx Class G Tail 10183' 8.5" 210 sx Class G 25 TUBING RECORD ;Date of Test IHours Tested September 29, 1995 24 Flow Tubing JCasing Pressure Press 317 I 507 SIZE IDEPTH SET (MD) PACKER SET (MD) 3.5" 19793' 9768' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED 183,302# carbolite proppant 9905'-9925' PRODUCTION TEST IMethod of Operation (Flowing, gas lif~, etc.) Flowing PRODUCTION FOR IOIL-BBL GAS-MCF ! ITEST PERIOD ¢ I 1759 2531 ICALCULATED OIL-aBE GAS-MCF 124-HOUR RATE I~ WATER-aBE 14 WATER-aBE CHOKE SIZE I GAS-OIL RATIO 1 76 J 1438 OIL GRAVITY-APl (corr) 24° 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cora chips. Form 10-407 Rev. 7-1-80 C. ONRNUED ON REVERSE SIDE Submit In duplicate 30. GEOLOGIO MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Kuparuk O 9866' 5854" Bottom Kuparuk O 9878' 5863' Top Kuparuk A 9878' 5863' Bottom Kuparuk A 10050' 5996' 31. LIST OF AI-f'ACI~MENTS Daily Drilling Histon/, Directional Survey · 32, I hereby certify that the foregoing is true and correct to the best of my knowlege. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in~situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 28: If no cores taken, indicate "none". Form 10-407 Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. · Date:10/04/95 Page: 1 ARCO Alaska Inc. DAILY DRILLING REPORT WELL:2T-22 RIG:PARKER 245 WI: 55% SECURITY:0 WELLID: AK8173 AFE: AK8173 TYPE:DEV AFE EST:$ 1322M/ 1720M AREA/CNTY:NORTH SLOPE STATE:AK API NUMBER:50-103-20224 FIELD: KUPARUK SPUD:06/16/95 START COMP: FINAL: 06/17/95 (1) TD: 828' (828) SUPV:JT 06/18/95 ( 2) TD: 3970' (3142) SUPV: JT 06/19/95 (3) TD: 3970'( 0) SUPV:JT 06/20/95 (4) TD: 4206' (236) SUPV:JT 06/21/95 (5) TD: 6165'(1959) SUPV:RLM 06/22/95 (6) TD: 9075' (2910) SUPV:RLM 06/23/95 (7) TD: 9707'(632) SUPV:RLM 06/24/95 (8) TD:10193' (486) SUPV:RLM 06/25/95 (9) TD:10193' ( 0) SUPV: PJ24 MW: 9.5 RIH Drill from 121' to 828' . DAILY: $57,224 CUM: $57,224 PV/YP: 31/29 ETD:SO APIWL: 8.2 EFC: $1,378,724 ~N: 10.2 PV/YP: 26/30 APIWL: 7.6 POOH TO PU HOLE OPENER Drilled from 828 to 3970. POOH. Tight and swabbing. Hit bridges. DAILY:S90,365 Cb/~:$147,589 ETD:SO EFC:$1,469,089 MW: 10.2 PV/YP: 18/12 APIWL: 7.8 TESTING BOPE Ream out bridge. Run 9-5/8" casing. Cement well. Prepare to test BOPE. DAILY:S196,193 CUM:$343,782 ETD:SO EFC:$1,665,282 MW: 9.7 PV/YP: 20/28 APIWL: 8.2 DRILLING Pressure test BOPE. Pressure test casing. Held H2S drill. Drill from 3980' to 4206'. DAILY:S91,453 CUM:$435,235 ETD:SO EFC:$1,756,735 MW: 9.8 PV/YP: 23/18 APIWL: 7.6 DRILLING Directional drill 8.5" hole from 4206' to 6165' DAILY'S93,006 C~4:$528,241 ETD:SO EFC'$1,849,741 MW: 10.1 PV/YP: 19/10 POOH Directional drill from 6165' to 9075'. DAILY: $74,902 CUM: $603,143 ETD:SO APIWL: 5.2 EFC: $1,924,643 MW: 10.9 PV/YP: 18/12 APIWL: 4.8 DRILLING Directional drill 8.5" hole from 9075' to 9707'. DAILY:S87,845 CUM:$690,988 ETD:SO EFC:$2,012,488 MW: 10.9 PV/YP: 24/12 APIWL: 4.0 POOH Directional drill 8.5" hole from 9707' to 10193'. DAILY:S88,931 CUM:$779,919 ETD:SO EFC:$2,101,419 MW: 10.9 CIRCULATE 7" CASING Run 7" casing to 10183' DAILY:S184,054 CUM:$963,973 PV/YP: 22/10 ETD:SO APIWL: 4.4 EFC: $2,285,473 Date: 10/04/95 Page: 2 06/26/95 (10) TD'10193~ ( 0) SUPV: R/lV/ ARCO Alaska Inc. DAILY DRILLING REPORT MW: 0.0 PV/YP: 0/ 0 APIWL: 0.0 RIG RELEASED Cement 7" casing. CIP at 1006 hfs 6/25/95. Freeze protect 7x9 5/8 annulus. Release rig at 2400 6/25/95. DAILY:S94,372 CUM:$1,058,345 ETD:SO EFC:$2,379,845 Date: 10/04/95 Page: 3 ARCO Alaska Inc. DAILY DRILLING REPORT REMJ~DIAL AND COMPLETION OPERATIONS ~LL: WELLID: AK8173 AiREA/CN~Y: FIELD: SPUD: RIG:NORDIC WI: 0% SECURITY:0 AFE: AK8173 TYPE:DEV AFE EST:$ 1322M/ 1720M STATE: API NUMBER: START COMP: FINAL: 08/22/95 (11) TD:10193' PB: 0' SUPV:DCL PREP ROAD FOR RIG MOVE MW: 0.0 Rig maintenance. Move rig from 2B pad to F-pit. -. DAILY:S36,750 CUM:$1,095,095 ETD:SO EFC: $2,416,595 08/23/95 (12) TD:10193' PB:10093' SUPV:DCL ~J BOP, PREP TO TEST. MW: 0.0 Move rig from F pit to 2T. Accept rig @ 0100 8/23/95. Prepare rig. DAILY:S17,800 CUM:$1,112,895 ETD:SO EFC: $2,434,395 08/24/95 (13) TD:10193' PB:10093' SUPV:DCL RIG W/ 3-1/2" COMPLETION Test BOPE and 7" casing. DAILY:S34,158 CUM:$1,147,053 ETD:SO MN: 0.0 EFC: $2,468,553 08/25/95 (14) SEAWATER/DIESEL TD:10193' PB:10093' SUPV:DCL RiH W/ 3-1/2" COMPLETION ?,f~,~: 0.0 Finish running in hole with 3-1/2" completion equipment. Freeze protect well. Secure well. Released rig at 2300 hrs 8-24-95. DAILY:S108,995 CUM:$1,256,048 ETD:SO EFC:$2,577,548 8/31/95 Perforate 'A' sands Perforated 'A' sand interval 9905'-9925' with 2-1/8" enerjet gun, bighole charges, 4 spf total, oriented +/- 90 degrees, 180 degree phasing. End of WellSummary for Well:AK8173 RECEIVED Alaska 0il & Gas 0~%. Commission Anchorage :2j:.-'4. ,' -,--.o ft ft ft ft 12!,00 0,0 12!,0'3 0,00 ~0,00 ~c, ,. 440 530,00 ?0,0 52?,?? 0,12 ~:l,O~ ?i,;~ 620 <'~ "41 ~0i !3~0~76 i570,83 !755 1i.7,i ...... 47.~ ?0~? i002,35 9i,4 i090,72 7!,76 72,~ 1270,37 ?2,7 1357,~`~ 177,7! 94,6 !445,!? 92,5 16!4,1i 2?4,77 ?2,O !673,2~ 34!,67 zm~ ;~:.- ~7~... ?4,2 1546:% V4,5 17!S,04 510,46 9t,5 ~, ...... ,, . ~:d~O~lff ..... .~ ,0 2Z?¥,33 I034,74 23!4,~5 ~ ^ ~7 3625,02 !~7,4 2726,2~ i866,70 5~ ~ - 207!,!A 4007~23 4098,30 41'74,01 4287,80 4380,g4 2994,95 7367,34 .... ~' ~:~ 252? ~wS,~ ,73 75:3 3i~!~i3 i67!~07 £//,} ~ .... ~ ^~ 3355~~ 4472,00 :_:-..-! . .~.d STATION AZIMUTH LATITUDE INCLN~ N/'S d,~o Oe~ ft ^ ~n ~,OO O,O0 3 .= =:~,00 -0,22 10,50 "~ ~ 10,77 ~,40 27~,"~ '~ 79. i~ ~ ~/4,51 !7,14 t6,85 276,99 !9,80 20,75 278,00 28,66 PS,hA ?' '"" 34,85 9$,62 ':~'~.q7 ~3,12 , 2~4,57 53,07 29 i! - 45,g7 ~o ~ i35,5~ .... r7 79 .~ ~a~. 270 ~/ t~,l? .... 31 ,'" . _ z.. 62,26 287,02 403,94 ~£ .... .. ~!& _ 62,02 2~,77 565,7! ~i,45 ~"' 80,77 285,99 645,64 60,~n 286,~ ,~, s9 59,48 287,R~ 713,:~ 9?-9? OEPARTURE DI~,~:MnN? AZIMUTH g!-Y ft ft deo 0,00 O,O0 ::-4! i ~" :97 an -0,62 1,98 -2,54 2,55 264,76 fi: ,.leal lOOft 0 ,C:O 0,16 O, '.."? 5,41 -45 '~ 47,97 -66,? 6~,81 283,27 9,09 -90,34 ?!,95 280,74 !,18 -116,51 11~,18 · .!44,81 i46,77 27'2,27 2,49 -iZz 1~ 178,4~ 279,24 2,ii -270,75 275,56 2~0,34 3,93 'OJ;T;' '- -385,i3 393,40 2S1,77 " 94 ZO: 3~~'' -439,I~ 445',% '~ <'~ -' .-497,54 ~. ~-~- VI . -se7 ~. =7~ "' 283,67 3,71 . / ,3 ¢..~ .;,... -766,.74 .... i~ -84!,36 871,60 2~5,0! 3,5? 1241,,42 1286 '"~ ..:'85 14 " 15.oo,57 "~,27 -'479~4z "'"' .'.' -!639,03 !700,4t 285, 1778,53 1867,01 ... /.07~.* dj -1588,78 2671,87 -;j 0020 i ~ 0,4',2 0,34 0,59 0,?I !,40 i:i7 O, 54 O, .37 ~773~10 3963,4~ 9244,57 ._ 2£?0, 93,4 5406,08 ?O,o 5591,72 i0!14,05' 231,7 TH~ LAST ft de~ deo ft · - ~ o~ tn':l 435!:~.~ 62,60 ~o~,~' ..... ~ '~t .... .- -4518,22 5755, ?5 ,r.' ~ .; :'.- jJ~ ::,.,, 57! ,:.~ ."J ,~ ; -~-~ .~ .658'¢,20 58,10 284:02 -~68Z,70 6648,2':.-' ~.~ a":: ?A~: ci i7(11:~4 .a'-.-i ;,~ _~ .;-ua. . .. . :u,.: ~, ._..-, ,.,, .,.=.., Y2 2~;:, :."- ......... -"--' 6~0,'~, '-'" =-q "'" "' ..... I ....,40 .,=.¢ 3£ ./,.,,--'"J £:-"£*~'/ /-JO iq';+ ,'-0 ....7~7,03 36,35 285.q0... 1883,20 -/z,0,03 7240,17 265,4~ ~84,5'4 284,?0 284,75 2~4,74 2S4,74 ?84,74 284,75 ~84,TM¢, ~en/ lOOft 0,63 0,72 0,46 0,57 2:'-'7 1 ... '7. 1,66 5,i6 i,12 l, 08, 0,04 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9796 Company: 10/11/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Kuparuk (Open Hole) LIS Well Job # Log Description Date BL RF Sepia DIR MWD Tape 2T-22 ~i~'.-~//O 95232 CDR [n~,~l C~ ~..~\'~//(,.-~,1) 1"~_.._950624 1 1 I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ARCO Alaska, Inc. Date: August 25, 1995 Transmittal #: 9291 RETURN TO: ARCO Alaska, Inc. Attn: Brian Hebert Kuparuk Records Clerk ATO-1119B P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following items. return one signed co~y of this transmittal. 2A-18~ Directional Survey Please acknowledge receipt and AK7621 /._2 ._~T.:22_-22q~:-o ~(~'~ Directional Survey5/19/95 AK8213 ' Directional Survey 6/23/95 AK8173 ~ ~~_.~T:2.6 Directional Survey 6/9/95 AK8237 E['~- ~ ~ -_._.T.:2~ Directional Survey 7/2/95 AK9229 ~ ~-~_.2_.T=29~ Directional Survey 5/31/95 AK8157 ~ ~t~ .-~.2.T. c3-1_~ Directional Survey 7/11/95 AK8181 ~ q~'"-~ .2T-3~6~_ Directional Survey ~~t95~ ...... AK8253 / ~: , · ..... ~'7. Date: 5/18/95 Mr. Vernon E. Pringle, Jr. DeGIoyer and MacNaughton One Energy Square Dallas, TX 75206 ':'?Earry Grant (2 copies), 3001 Porcupine Dr. Anchorage, AK 99501 ARCO Alaska, Inc. Date: August 11, 1995 Transmittal #: 9285 RETURN TO: ARCO Alaska, Inc. Attn: Bdan Hebert Kuparuk Records Clerk ATO-1119B P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted below are the following items. Please acknowledge receipt and return one signed copy of this transmittal. r..I,)/,' 0'~O~2A-18 Sub-Surface Directional Survey ..-------"'S-d'rvey ~,~ o~1.... 2A-28 SurveySUb-Surface Directional 2T-22 Sub-Surface Directional Survey Sub-Surface Directional ~ ~ O'~~T-26 Survey ~ ~"-..-O"}~ 2T-29 SurveySUb-Surface Directional ¢//¢"'-0¢"/fl 2T-31Receipt ,Sub-SurfaCesu rve. y_..// Directional Acknowledged:/''7/--~-,-~ ,.~ ~ DiSTRiBUTiO ;i~/ '/ ' Mr. Vernon E. Pringle, Jr. DeGIoyer and MacNaughton One Energy Square Dallas, TX 75206 5/18/95 AK 7621 712/95 AK 9229 6/23/95 AK 8173 6/9/95 AK 8237 5/31/95 AK 8157 7/11,95 -. Date.; · ,, u,, ~.""~'~anChorage.Cuns Co[a~fS,lo~ :Lar~ Grant (2 ~pies) 3001 Porcupine Dr. Anchorage, AK 99501 ALASKA OIL AND GAS / CONSERVATION COMMISSION / TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 14, 1995Date Michael Zanghi Drill Site Develop. Supv. ARCO Alaska, Inc. P O Box 10~360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit 2T-22 ARCO Alaska, Inc. Permit No. 95-86 Sur. Loc. 417'FSL, 556'FWL, Sec. 1, TllN, R8E, UM Btmnhole Loc. 2298'FSL, 1433'FEL, Sec. 3, TllN, RSE, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling oper. ations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Russell A. D~uglas Commissioner BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ~ ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work Drill X Redrill [~ 1 b Type of Well Exploratory ~] Stratigraphic Test [~] Development Oil X Re-Entry r"l Deepen [~ Service ~] Development Gas r~ Single Zone X Multiple Zone F'~ 2. Name of Operator 5. Datum Elevation (DF or KB) 1 0. Field and Pool ARCO Alaska, Inc. RKB 41', Pad 81' feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25568, ALK 2666 4. Location of well at surface 7. Unit or property Name 1 1. Type Bond (see 20 AAC 25.025) 417' FSL, 556' FWL, Sec. 1, T11N, R8E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 2239' FSL, 1204' FEL, Sec. 3, T11N, R8E, UM 2T-22 #U-630610 At total depth 9. Approximate spud date Amount 2298' FSL, 1433' FEL, Sec. 3, T11N, R8E, UM 6/1 5/95 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 2T-2 10270' MD 1433 ~ TD feet 10.7' ~ 540' MD feet 2560 6152' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 600' feet Maximum hole angle 61,84° Maxirnumsurface 1700 psig At totaJ depth (TVD) 3200 pslg 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Len~lth MD TVD MD TVD {include sta~le data) 24" 16" 62.5# H-40 Weld 80' 41' 41' 121' 121' +_200 CF 12.25" 9.625" 40.0# L-80 BTC 3867' 41' 41' 3908' 2872' 790 Sx Arcticset III & HF-ERW 640 Sx Class G 8.5" 7" 26.0# L-80 BTCMOE 10229 41' 41' 10270' 6152' 210SxClassG HF-ERW Top 500' above Kuparuk 1 9. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cement~ ~%asured depth True Vertical depth Structural~ E£EiV EIJ Conductor Surface Intermediate ProductiondUN 1 2 1995 Liner A~ska 0il & Gas Cons. Commission Perforation depth: measured true verticalAnch0ra :~ 20. Attachments Filing fee X Property plat ~] BOPSketch X Diverter Sketch X Drilling program X Drilling fluid program X Time vs depth plot [-'1 Refraction analysis E] Seabed report [-~ 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed '~ API~r CommissionTitleuse OnlyDrill Site Develop. Supv. Date Permit._Number ~ I Approval dat ~;),.~..,.1 See cover letter for /~',_~"--oc>~' ~ 50-/4~- .2..~ .~. ~_. ~' e(~ ...- /.~..~ other rec{uirements Conditions of approval Samples required [~ Yes ~ No Mud Icg required r'] Yes ~ No Hydrogen sulfide measures J~ Yes [~] No Directional survey required ]~ Yes [~] No Required working pressure forBOPE [~] 2M [] 3M [~] 5M [~ 10M r~ 15M Other: ORIGINAL SIGNED BY RUSSELL A. DOUGLASS by order of I IL I C~-- Approved by Commissioner the commission Date Form 10-401 Rev. 7-24-89 Submit in triolicate GENERAL DRILUNG PROCEDURE KUPARUK RIVER FIELD 2T-22 , . , , , . . . , 10. 11. 12. 13. 14. 15. 16. 17. Move in and rig up Parker #245. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (3,908')according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2000 psi. Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole to total depth (10,270') according to directional plan. Run open hole evaluation logs or LWD tools as needed. Run and cement 7" casing. (If significant hydrocarbon zones are present above the Kuparuk, sufficient cement will be pumped for isolation in accordance with Rule 20 ^AC 25.030. Alternatively, if significant hydrocarbon zones occur within 200' TVD of the surface casing shoe, cement will be down squeezed in the annular space between the surface and production casing after the primary cement job is completed.) ND BOPE. NU tubinghead & either full opening valve (if logging planned) or master valve and upper tree assembly (if no logging planned). Note: As a dedicated producer, no cased hole cement bond logs will be run unless there are problems with the cement job. Secure well and release rig. Move in and rig up Nordic #1. Install and test BOPE. Pressure test 7" casing to 3500 psi. Perforate and run completion assembly. Set and pressure test packer. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. RECEIVED JUN 1 2 1995 Alaska Oil & Gas Cons. Commission Anchor; ~;' DRILLING FLUID PROGRAM Well 2T-22 Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing 9.0-10.0 15-25 15-35 50-80* 5-15 15-40 10-12 9.5-10 +10% Drill out to weight up 8.4-9.6 5-15 5-8 30-40 2-4 4-8 8-10 9.5-10 4-7% Weight up to TD 11.0 10-18 8-12 35-50 2-4 4-8 4-5 through Kuparuk 9.5-10 <12% Drilling Fluid System: Tandem Brandt Shale Shakers Triple Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuges, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators RECEIVED JUN 1 2 199,5 A!aska 0il & Gas Cons. Commission Anchore ,~ Notes: Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 1,700 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3000 psi. The nearest existing well to 2%22 is 2T-2. As designed, the minimum distance between the two wells would be 10.7' @ 540' MD. Incidental fluids developed from drilling operations will be hauled to the nearest permitted disposal well or will be pumped down the surface/production casing annulus of an existing well. That annulus will be left with a non-freezing fluid during any extended shut down (> 4 hr) in pumping operations. The 2T-22 surface/production casing annulus will be filled with diesel after setting 7" and prior to the drilling rig moving off of the well. If isolation is required per regulations on significant hydrocarbons, the annulus will later be sealed with cement from the surface shoe to the base of the permafrost, with Arctic pack fluid or diesel from the base of the permafrost to the surface. Risks in the 2T-22 drilling area include lost circulation and high pressures in the Kuparuk formation. Lost circulation above the Kuparuk will be addressed with lost circulation material (LCM) and reduced circulating rates as needed. The 7" casing will be topset above the Kuparuk and a 5" liner run to TD if lost circulation cannot be controlled with LCM and reduction of circulating pressure alone. Efforts to reduce Kuparuk geopressure at the target location and careful analysis of pressure data from offset wells show that a mud weight of 11.0 ppg will provide sufficient overpressure to safely drill, trip pipe, and cement. The 9-5/8" casing shoe will be tested to an equivalent mud weight of 12.5 ppg upon drilling out of the surface casing. *Spud mud should be adjusted to a FV between 50-80 sec/qt to drill gravel beds. iCreotedi by : jones For: D PETRASIt I Date plotted : 9-May-95 Reference is 22 Version #5. iCoordinotes ore in feet reference slot #22. . True Vertical Deference RKB. ARC0 ALASKA, Structure : Pad 2T Well : 22 Field : Kuparuk River Unit Location : North Slope, Alaska Wesf 7650 7200 6750 6300 5850 5400 4950 4500 4050 3600 3150 2700 2250 1800 1350 900 450 0 450 Scale 1 · 225.00 o o 0 _ .. 4_3 450 _ TD LOCATION:  9'°* 2298' FSL, 1433' [--EL N 75.49 DEG W SEC 3 T11N RSE ET ~ ~._ ,~- .... =_'"'__ 7372 (TO TARG ) RKB E~AnON' 1~' TARG~ LOCATION. %~ 4~ ¢ . ~ aa ~¢ 2239' FSL, 1204' FEL ~~o~ ~* SEC, 3, T11 N, RSE ~ ~°*~- TARG~ -~b~ ~ KOP ~D=600 TMD=600 DEP=O ~=5870 900 _ ._C 135o_ -- (:I) ~8oo_ Eb _ 2250_ -- C) ~ 2700_ -- 3150_ -- 3600_ -- 4050_ I - I4500_ V 4950_ 5850_ 6300_ TMD=9902 6.00 DEP=7272 NORTH 1822 12.00 BUILO 3 DEG / 100' WEST 7040 18.00 24.00 B/ PERMAFROST TVD=1502 TMB=1539 DEP=226 30.00 T/ UGNU SNDS TVD=1547 TMD=1591 DEP=251 36.00 42.00 48.00 54.00 T/ W SAK SNDS TVD=2192 TMD=2482 DEP=855 60.00 EOC TVD=2284 TMD=2661 DEP=IO08 RECEIVED Alaska Oil & 8as Cons. Commission Anchore ..,, B/ W SAK SNDS 1¥D=2672 TMD=3484 DEP=1734 9 5/8" CSG PT TVD=2872 TMD=3908 DEP=2107 K-lO TVD=3027 TMD=4236 DEP=2597 K-5 '[VD=4542 TMD=7446 DEP=5227 MAXIMUM ANGLE 61.84 DEG _2250 SURFACE LOCATION: 417' FSL, 556' F'WL SEC. 1, T11N, R8E BEGIN ANGLE DROP TVD=5186 TMD=8810 DEP=6429 60.00 56.00 DROP 2 DE(;; / 100' 52.00 4-8.00 HRZ TVD=5710 TMD=9686 DEP=7127 42.00 TARGET - T/ KUP SNDS (EOD) TVD=5870 TMD=9903 DEP=727g TARGET ANGLE T/ ZONE A TVD=5873 TMD=9g06 DE T/ A3 SNDS ~VD:5887 TMD:9..q24 DEP:7286 40 DEG B/ KUP SNDS rVD=S999 TMD=~O070 DEP=7380 TD / ?" CSG PT TVD=61§2 TMD=10270 DEP=7§09 450 0 450 900 1350 1800 2250 2700 5150 3600 4050 4500 4950 5400 5850 6500 6750 7200 7650 Scale 1 : 225.00 Vertical Section on 284.51 azimuth with reference 0.00 N, 0.00 E from slot #22 _1800 _ /% 1350 I I _ 900 Z _ 0 _ 450 ---I- -- _ 0 ~ .. -- _ 450 g Created by : jones Date plotted : 9-May-95 Plot Reference is 22 Version ~5. Coordinates are in feet reference slat true Vertical Depths are reference RKB. --- Baker Hughes INTEQ --- ARCO ALASKA, Structure : Pad 2T Well: 22 Field : Kuparuk River Unit Location : North Slope, Alaska <-- Wesf Scale 1. lO.OO 280 260 240 220 200 180 160 140 120 1 O0 80 60 40 20 0 20 40 60 260 I I II . I I 260 240 220 ~ )0 2OO 1500 180 1400 100 700 1000 11 O0 24O 220 2OO 180 160 140O 120 100 80 6o 160 140 1300 140 100 1200 1500 1800 1100 1700 120O 1500 160O 900 800 600 8OO 7OO 110 900 590O ~o I 100 I 80 Z ~o 0 .___i_. , 40 ~' 2O 3800 140C 1900 2O 0 60 _ 0 .. ~- 8O 100 1600 370O i400 1200 18O0 20 ~20O 1100 1700 1000 /~ oCO 1600 60 ~__ 3500 1500 ~ ~ 1300 ./~00 80 · ' 0 100 0 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 20 40 60 < West Scale 1 · 10.00 Jcreated by : jones jDate plotted : 9-May-g5 JPIot Reference is 22 Version #5. jCoordinates are in feet reference slot #22. jTrue Vertical Depths are reference RKB. --- Baker Hughes INTEQ --- I ARCO ALASKA, ]D_C. Structure : Pad 2T Well: 22 Field : Kuparuk River Unit Location : North Slope, Alaska <-- West co,e . 0.oo 440 440 1600 4900 400 400 360 4800 ,.,~ot) 360 320 1800 s~g~) 320 4700 280 280 24O 200 J 160 C- 120 · J · L O ~o 40 _ 120 _ 0 0 _ 0 cq 160 J .. ~ 200 460o 1700 44O0 430O 2300 22OO 2000 19 O0 18OO I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 920 880 840 800 760 720 680 640 600 560 520 480 440 400 .$60 320 280 < West Scale1' 20.00 24O 200 j 160 J ,207 O 4O _ 40 120 o o __ 160 ,, 200 0 .dPARUK RIVER UNIT 20" DIVERTER SCHEMATIC I4 5 3 DO NOT SHUT IN DIVERTER AND VALVE AT SAME TIME UNDER ANY CIRCUMSTANCES. . . MAINTENANCE & OPER/~TION UPON INITIAL INSTALLATION: · CLOSE VALVE AND FILL PREVENTER WITH WATER TO ENSURE NO LEAKS. · CLOSE PREVENTER TO VERIFY OPERATION AND THAT THE VALVE OPENS IMMEDIATELY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN VALVE TO ACHIEVE DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(b) 1. 16" CONDUCTOR. 2. SLIP-ON WELD STARTING HEAD. 3. DIVERTER ASSEMBLY WITH ONE 2-1/16"- 2000 PSI BALL VALVE. 4. 20" - 2000 PSI DRILLING SPOOL WITH ONE 16" OUTLET. 5. ONE 16" HCR KNIFE VALVE WITH 16" DIVERTER LINE. THE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. DIVERTER LINE WILL BE PLACED FOR OPTIMUM DISPERSION IN PREVAILING WIND CONDITIONS. 6. 20" - 2000 PSI ANNULAR PREVENTER. DKP 11/9/94 < < ,6 , 5 13 5/8" 5000 PSISTACK ACCUMULATOR CAPACITy TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAUUC FLUID. 2_ ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER UMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH WATER. 2- CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 3 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 3 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE UNE VALVES. 6. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. 7. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. CONTINUE TESTING ALL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3000 PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BO3-FOM PIPE RAMS. TEST BOTTOM RAMS TO 250 PSI AND 3000 PSI FOR 3 MINUTES. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BUND RAMS AND TEST TO 3000 PSI FOR 3 MINUTES. BLEED TO ZERO PSI. 10. OPEN BUND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND MNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI FOR 3 MINUTES. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16"-2000 PSI STARTING HEAD 2_ 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 1:~5/8" - 5000 PSI SPACER SPOOL 4. 13~5/8"- 5000 PSI PIPE RAMS 5. 13-5/8" - 5000 PSI DRLG SPOOLW/ CHOKE AND KILL UNES 6. 1:~5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BUND RAMS ON BTM 7. 1::~5/8" - 5000 PSI ANNULAR WELL PERMIT CHECKLIST oo,. WELL NAME GEOL AREA PROGRAM: exp [] dev~ redrll [] serv [] /?/,~',~ o~/o~ sso~ ADMINISTRATION ENGINEERING 1. Permit fee attached ................... ~Y 2. Lease number appropriate ................ IY 3. Unique well name and number ............... 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary., tY 6. Well located proper distance from other wells ...... '7. Sufficient acreage available in drilling unit ...... ~Y 8. If deviated, is wellbore plat included ......... IY 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order ..... 12. Permit can be issued without administrative approval.. 13. Can permit be approved before 15-day wait ........ 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. CMT will cover all known productive horizons ...... Casing designs adequate for C, T, B & permafrost .... Adequate tankage or reserve pit ............. If a re-drill, has a 10-403 for abndnmnt been approved. Adequate wellbore separation proposed .......... If diverter required, is it adequate .......... Drilling fluid program schematic & equip list adequate BOPEs adequate ..................... Conductor string provided ............... ~ N Surface casing protects all known USDWs ........ ~ N CMT vol adequate to circulate on conductor & surf csg..~ N CMT vol adequate to tie-in long string to surf csg . . Y ~ BOPE press rating adequate; test to %~ pstg.' ~ N Choke manifold complies w/API RP-53 ('Ma~' 84) ....... 4~-~..~J~ Work will occur without operation shutdown ....... ~ N Is presence of H2S gas probable ............ ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y/ 31. Data presented on potential overpressure zones .. .... Y//~ 32. Seismic analysis 9f shallow gas zones .......... ~ N /~,/.. '7-- 33. Seabed condition survey (if off-shore) ........ /Y N 34. Contact name/phone for weekly progress reports . . ./ . Y N . [exploratory only] // . GEOLOGY: ENGINEERING: COMMISSION: Co~m~ts/Instructions: HOW/jo - A:%'=ORMS%cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not . particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER · SCHLUMBERGER * COMPANY NAME : ARCO ALASKA~ INC. WELL NAME : 2T-22 FIELD NAME : KUPARUK RIVER BOROUGH : NORTH SLOPE STATE : ALASKA AP1 NUMBER : 50-~03-20224-00 REFERENCE NO : 95232 LIS Tape Verification Listing Schlumberger Alaska Computing Center 10-OCT-ggg5 15:39 · =*, REEL HEADER *=~* SERVICE NAME : EDIT DATE : 95/19/19 ORIGIN : FLIC REEL NAME : 95232 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, INC., KUPARUK 2T-22, API #59-~93-20224-99 · ~, TAPE HEADER SERVICE NAME : EDIT DATE : 95/19/19 ORIGIN : FLIC TAPE NAME : 95232 CONTINUATION # : ~ PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC., KUPARUK 2T-22, API #59-993-29224-99 TAPE HEADER KUPARUK RIVER MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA 2T-22 599032922499 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 99-06T-95 BlT RUN 1 BIT RUN 2 BIT RUN 3 JOB NUMBER: 95232 95232 LOGGING ENGINEER: GREEN GREEN OPERATOR WITNESS: MORRISON MORRISON SURFACE LOCATION SECTION: 9 TOWNSHIP: ~N RANGE: 8E FNL: FSL: FEL: FWL: 556 ELEVATION(FT FROM MSL 9) KELLY BUSHING: 122.9~ DERRICK FLOOR: 122.0e GROUND LEVEL: 89.7e WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.59e 9.625 3958.9 2ND STRING PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 10-0CT-1995 15:30 3RD STRING PRODUCTION STRING REMARKS: Well drilled 20-JUN through 24-JUN-95 with CDR only, All data was collec%ed in two bit runs, No depth shifting was done at ARCO's request. $ $ **** FILE HEADER *=,= FILE NAME : EDIT ,001 SERVICE : FLIC VERSION : 001C01 DATE : 95/10/1~ MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : PAGE: FILE HEADER FILE NUMBER: EDITED MERGED MWD Dep%h shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 4150.~ 10193.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH MWD $ MERGED DATA SOURCE LDWG TOOL CODE MAD $ REMARKS: BlT RUN NO. MERGE TOP MERGE BASE 4150.e 4740.0 4740.0 9075.0 9075.0 10193.0 This file contains ~he Very Enhanced resisi~ivity (QRO processing) with 2' average that was repro- cessed at GeoQuest Anchorage. It also contains merged and edited files from Bit Runs 1 & 2. $ LIS FORMAT DATA LIS Tape Verificaf, ion Lis~,|ng Schlumberger Alaska Compu~,|ng Cent, er 10-0¢T-1995 15:30 PAGE: DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 5 66 6 73 7 65 8 68 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 0 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 APl AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 57028 00 0~0 ~0 0 1 1 I 4 68 0000000~0 RA MWD OHMM 57028 Oe 0~0 ee e 1 I 1 4 68 00eOe00000 RP MWD OHMM 57028 00 00e 00 0 1 1 1 4 68 ooeoeooe00 VRA MWD OHMM 57028 00 0~0 00 e 1 I 1 4 68 0000ee0000 VRP MWD OHMM 57~28 00 000 00 0 1 I 1 4 68 0000000000 DER MWD OHMM 57028 00 ~0 00 0 ! 1 I 4 68 0000000000 ROP MWD FPHR 57028 0~ 000 0~ ~ 1 1 1 4 68 ~000000000 GE MWD GAPI 57028 00 000 00 0 1 1 1 4 68 0000000000 FET MWD HR 57028 00 0~0 00 0 1 1 1 4 68 000000~000 DATA DEPT. 10193.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD VRP.MWD -999.250 DER.MWD -999.250 ROP.MWD 89.552 GR.MWD FET.MWD -999.250 DEPT. 4150.000 RA.MWD -999.250 RP.MWD -999.250 VRA.MWD VRP,MWD -999.250 DER,MWD -999.250 ROP.MWD -999,250 GR.MWD FET.MWD -999.250 -999.250 -999.250 -999.250 74.050 LIS Tape Verification Listing Schlumberger Alaska Computing Center 1~-0CT-1995 15:30 PAGE: END OF DATA ** **** FILE TRAILER FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 0~1C01 DATE : 95/i0/i0 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT SERVICE : FLIC VERSION : 99iC91 DATE : 95/i9/i9 MAX REC SIZE : 1924 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: 9.5999 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH MAD $ MERGED DATA SOURCE LDWG TOOL CODE 4749.9 MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE $ REMARKS: This file is the MAD pass run on Bit Run i, from 4i59' to 4749;. No depth shifts were made at ARCO's request, $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 10-0CT-199~ 1~:30 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ~ TYPE REPR CODE VALUE 1 66 0 2 66 0 $ 73 28 4 66 S 66 6 73 ? 8 68 0.S 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 SET TYPE - CHAN ** PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 57028 eO ~00 00 0 2 RA MAD OHMM 57028 00 ~00 eO 0 2 1 1 4 68 00~0000000 RP MAD OHMM 57028 00 ~00 00 0 2 1 1 4 68 ~0~0~00000 DER MAD OHMM 57028 ~0 00~ 00 0 2 1 1 4 68 0~00000~00 ROP MAD FPHR 57~28 ~0 0~0 00 0 2 1 1 4 68 00~0~00000 GR MAD GAPI 57028 ~0 00~ 00 0 2 1 1 4 68 00eooooe00 FET MAD HR 57028 00 000 00 0 2 1 1 4 68 ** DATA ** DEPT. 474e.eee RA.MAD $.417 RP.MAD 3.e82 DER.MAD ROP.MAD 1385.951 GR.MAD 84,.112 FET,.MAD 0.3~0 3.183 END OF DATA LIS Tape Verification L|sting Schlumberger Alaska Computing Center *=** FILE TRAILER =*** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 001C01 DATE : 95/10/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 10-0CT-199~ 1~:30 PAGE: **=, TAPE TRAILER ,**= SERVICE NAME : EDIT DATE : 95/10/10 ORIGIN : FLIC TAPE NAME : 95232 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA~ INC.~ KUPARUK 2T-22~ API #50-103-20224-~ *~, REEL TRAILER SERVICE NAME : EDIT DATE : ORIGIN : FLIC REEL NAME : 95232 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA~ INC., KUPARUK 2T-22, API #50-1~3-20224-~0