Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-082STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________NIKAITCHUQ SP36-W5 JBR 03/18/2025 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 Tested with 4 1/2" test joint. Precharge Bottles = 36 all at 1000psi each. Good Test Test Results TEST DATA Rig Rep:S. Lawrence / C. SmithOperator:Hilcorp Alaska, LLC Operator Rep:T. Kruger / M. Smith Rig Owner/Rig No.:Doyon 15 PTD#:2130820 DATE:2/2/2025 Type Operation:WRKOV Annular: 250/2500Type Test:INIT Valves: 250/5000 Rams: 250/5000 Test Pressures:Inspection No:bopBDB250203063109 Inspector Brian Bixby Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 5 MASP: 1079 Sundry No: 324-686 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 15 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13 5/8 P #1 Rams 1 3 1/2x6 P #2 Rams 1 Blind/Shear P #3 Rams 1 3 1/2x6 P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3 1/8 P HCR Valves 2 3 1/8 P Kill Line Valves 1 3 1/8 P Check Valve 0 NA BOP Misc 0 NA System Pressure P3050 Pressure After Closure P2320 200 PSI Attained P10 Full Pressure Attained P36 Blind Switch Covers:PYES Bottle precharge P Nitgn Btls# &psi (avg)P10@4100 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA Annular Preventer P20 #1 Rams P8 #2 Rams P8 #3 Rams P8 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P2 HCR Kill P2 9 9 9 99 9 999 9 P.I. Supv Comm: Rig Coil Tubing Unit? No Rig Contractor Rig Representative Operator Operator Representative Well Permit to Drill # 2130820 Sundry Approval # 324-686 Operation Inspection Location Working Pressure, W/H Flange P Pit Fluid Measurement P Working Pressure P P Flow Rate Sensor P Operating Pressure P P Mud Gas Separator P Fluid Level/Condition P P Degasser P Pressure Gauges P P Separator Bypass P Sufficient Valves P P Gas Detectors P Regulator Bypass P P Alarms Separate/Distinct P Actuators (4-way valves) P P Choke/Kill Line Connections P Blind Ram Handle Cover P P Reserve Pits P Control Panel, Driller P P Trip Tank P Control Panel, Remote P PFirewallP P 2 or More Pumps P P Kelly or TD Valves P Independent Power Supply P P Floor Safety Valves P N2 Backup P P Driller's Console P Condition of Equipment P P Flow Monitor P Flow Rate Indicator P Pit Level Indicators P Valves P PPE P Gauges P Remote Hydraulic Choke P Well Control Trained P Gas Detection Monitor P FOV Upstream of Chokes P Housekeeping P Hydraulic Control Panel P Targeted Turns P Well Control Plan P Kill Sheet Current P Bypass Line P FAILURES:0 CORRECT BY: COMMENTS Brian Bixby 2/2/2025INSPECT DATE AOGCC INSPECTOR Doyon 15 Doyon Hilcorp North Slope LLC MISCELLANEOUS Flange/Hub Connections Drilling Spool Outlets Flow Nipple Control Lines RIG FLOOR ALASKA OIL AND GAS CONSERVATION COMMISSION RIG INSPECTION REPORT HCR Valve(s) Manual Valves Annular Preventer Working Pressure, BOP Stack Stack Anchored Choke Line Kill Line Targeted Turns Pipe Rams Blind Rams T. Kruger / M. Smith S. Lawrence / C. Smith Locking Devices, Rams BOP STACK Initial Test was to 5000psi. GOOD Test CHOKE MANIFOLD Spy Island MUD SYSTEM Nikaitchuq SP36-W5 Workover CLOSING UNIT 2025-0202_Rig_Doyon15_Nikaitchuq_SP36-W5_bb rev. 4-19-2023 9 9 99 9 9 -5HJJ 1 Gluyas, Gavin R (OGC) From:Lau, Jack J (OGC) Sent:Monday, December 9, 2024 11:21 AM To:AOGCC Records (CED sponsored) Subject:FW: [EXTERNAL] NIK_SP36-W5 (213-082) From: Keith Lopez <keith.lopez@hilcorp.com> Sent: Monday, December 9, 2024 10:30 AM To: Lau, Jack J (OGC) <jack.lau@alaska.gov> Cc: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>; Keith Lopez <Keith.Lopez@hilcorp.com> Subject: RE: [EXTERNAL] NIK_SP36-W5 (213-082) Sorry about the error in the procedure. We do plan on using injection water as our kill fluid (which is our recycled produced water, SG 1.02, ~8.5 ppg). We are using our worst-case scenario with our well building to 1,400 psi and only gas from formation to surface. Currently, the intake pressure is building but is only at 1,094 psi and rising 8 psi per day. We will have the ability to weight up our injection water if we need heavier kill fluid. Please let me know if you have additional questions. Thanks CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. 2 Keith Lopez Operations Engineer – Western North Slope Office: 907-777-8438 Cell: 907-903-5432 keith.lopez@hilcorp.com From: Lau, Jack J (OGC) <jack.lau@alaska.gov> Sent: Friday, December 6, 2024 3:45 PM To: Keith Lopez <keith.lopez@hilcorp.com> Cc: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: [EXTERNAL] NIK_SP36-W5 (213-082) Keith – Looking at the sundry app for NIK_SP36-W5 (213-082), the KWF should be 8.4 ppg, but the beginning of the program uses injection water as the kill fluid which I assume is 8.33 ppg (<8.4 ppg). then later in the program calls for 8.6 ppg 3% KCl/NaCl. Please clarify. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. 3 Thanks Jack Lau Senior Petroleum Engineer Alaska Oil and Gas Conservation Commission (907) 793-1244 OƯice (907) 227-2760 Cell The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9.Property Designation (Lease Number):10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 21,813 NA Casing Collapse Conductor NA Surface 2,260psi Intermediate 3,090psi Slotted Liner NA Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng Keith Lopez Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0388574, ADL0388575, ADL0388577, ADL0391283 213-082 C.O. 639 NIKAITCHUQ SP36-W5 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-629-23492-00-00 Hilcorp Alaska, LLC Length Size Proposed Pools: 3,396 21,130 3,596 1,079 SCHRADER BLUFF OIL SCHRADER BLUFF OIL 160' 160' 12.6# / L-80 TVD Burst 9,456' MD NA NA 12,390' 5,020psi 5,750psi 2,453' 3,507' 3,596' 3,470' 12,390' Slotted Liner 160' 20" 13-3/8" 9-5/8" 3,470' 5-1/2"9,597' Slotted Liner 907-777-8438 keith.lopez@hilcorp.com Operations Manager January 15, 2025 4-1/2" Perforation Depth MD (ft): NIKAITCHUQ SLXP Liner Hanger Packer, seven oil swell packers, and NA 11,219' MD/3,426' TVD, see schematic for swell packers, and NA NA 21,130' Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 4:07 pm, Dec 05, 2024 Digitally signed by Sara Hannegan (2519) DN: cn=Sara Hannegan (2519) Date: 2024.12.05 15:55:17 - 09'00' Sara Hannegan (2519) 324-686 Witnessed BOP test to 3500 psi, Annular to 2500 psi. A.Dewhurst 06DEC24 10-404 JJL 12/9/24 X DSR-12/16/24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.12.17 10:23:19 -09'00'12/17/24 RBDMS JSB 121824 Well: SP-36 PTD: 213-082 API: 50-629-23492-00-00 Well Name:SP-36 API Number:50-629-23492-00-00 Current Status:Producer Rig:Doyon 15 Estimated Start Date:01/15/25 Estimated Duration:8 days Regulatory Contact:Darci Horner Permit to Drill Number:212-082 First Call Engineer:Keith Lopez (907) 777-8438 (O) (907) 903-5432 (M) Second Call Engineer:Sara Hannegan (907) 564-4624 (O) (907) 309-1196 (M) Current Bottom Hole Pressure: 1,400 psi @ 3,207’ TVD |8.4 PPGE Max Potential Surface Pressure: 1,079 psi Gas Column Gradient (0.1 psi/ft) Max Angle: 83° Sail Angle from 3,470’ MD to ESP setting depth of 9,400’ MD Brief Well Summary: SP36 was drilled and completed in August 2013 as a Schrader Bluff OA producer with an ESP completion. In 2023, a failed ESP was pulled from the well and a lower 3-1/2” completion was installed to increase the velocity of the produced fluid and reduce sand accumulation. The current ESP had a 1.5 year run life and appears to have parted the shaft. Objectives: Pull ESP completion and run new ESP completion. Notes Regarding Wellbore Condition: x Casing test from 10,080’ MD to 2,000 psi passed on 5/21/2023. Pre-Rig Procedure (Non Sundried Work) Operations: 1. Bleed off gas cap from IA before the rig move to the well Brief RWO Procedure (Begin Sundried Work) 1. MIRU Doyon 15 WO Rig, ancillary equipment, and lines. 2. Displace corrosion inhibitor from capillary line prior to pulling ESP. 3. Kill well by bullheading the tubing string and the IA. a. Pump 130% tubing volume (186 bbls) of injection water inhibited with biocide. b. Pump 130% annulus volume (686 bbls) of injection water inhibited with biocide. c. Monitor OA annulus during kill. 4. Flow check for 30 min to ensure the well is killed. 5. Install BPV inside tubing hanger as per Vault. 6. Nipple down X-mas tree. 7. Make up blanking plug on top of tubing hanger as per Vault procedure. 8. Nipple up BOP. 9. Run 4-1/2”, and 2-7/8” test joint and engage tubing hanger blanking plug. a. Perform full BOP pressure test to 250/3,500 psi (notify AOGCC 48 hours prior to BOP test). Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 10. Pull 4-1/2” test joint with blanking plug. Well: SP-36 PTD: 213-082 API: 50-629-23492-00-00 11. Pull BPV from the tubing hanger per Vault procedure. 12. Call out Centrilift to pull ESP and pull tubing hanger. 13. RU tubing handling equipment. 14. Pump approximately 10 bbl/hour (+ pipe displacement while pulling pipe) of 8.6 ppg 3% KCl/NaCl brine down the annulus throughout the operations to maintain well fill. 15. POOH with 4-1/2” ESP completion standing back tubing and laying down ESP. Record number of clamps recovered. 16. RIH with 4-1/2” 12.25# L-80 TK-15XT and ESP completion to +/- 9,394’ with duel encapsulated capillary strings. a. Check electrical continuity every 1000’. b. Note PU and SO weights on tally. c. Install ESP clamps per Baker, and cross coupling clamps every other joint 17. Land tubing hanger. Use extra caution to not damage cable. 18. Lay down landing joint. 19. Set BPV. 20. ND BOPE and NU tree. 21. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV. 22. RDMO Doyon 15. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOPE Schematic 4-½” L80 12.6# W563 TKXT15Production TubingHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producerwith conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc.Nose Guide ShoeAs CompletedMay 2023 Resman Oil/Water TracerSub #1 Interm. Casing9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD,3,457' TVD -Baker SLXPLiner Hanger/PackerSurf. Casing13-3/8", 68 #3,470' MD, 2,453'TVD81º Inc.4 ½ Swivel Joint 11,219' MD, 3426'TVD – L1 - BakerSLXP LinerHanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe withBent JointHAL 5-½” Oil SwellPacker11,437-11,454' MD,Planned Casing ExitWindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568'TVD89º Inc. Resman Oil/Water Tracer Sub#2 Resman Oil/Water TracerSub #3Item MD (ft)Resman tracer Sub #1 - ROS 683 / RWS 751 12371Resman tracer Sub #2 - ROS 682 / RWS 750 12419Resman tracer Sub #3 - ROS 681 / RWS 749 11304Item MD (ft)5-1/2" Swell Pkr #1 210875-1/2" Swell Pkr #2 202265-1/2" Swell Pkr #3 186695-1/2" Swell Pkr #4 175325-1/2" Swell Pkr #5 168615-1/2" Swell Pkr #6 152305-1/2" Swell Pkr #7 14039Item L1 MD (ft)5-1/2" Swell Pkr #1 192835-1/2" Swell Pkr #2 179805-1/2" Swell Pkr #3 167145-1/2" Swell Pkr #4 155835-1/2" Swell Pkr #5 139925-1/2" Swell Pkr #6 123635-1/2" Swell Pkr #7 11493TD20870'MD/3546'TVDTD21813'MD/3396'TVDVelocity String: PHL Packer 10' pup of 4-½” tubing,XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD9,456' MD, 3,207' TVD, 83° Inc, - Bottom Motor cenetralizerCentrilift conventional ESP, 66 Stages Flex 47 GS3 Seals,562XP motor9394' MD / 3199' TVD Discharge GaugeDate Activity8/18/2013Drill and Complete with TTC-ESP12/15/2013Pull TTC-ESP and replace withconventional ESP4/25/2019Pull ESP due to electricalfailure and replace withconventional ESP5/26/2023Pull ESP due to ESP failure,run 3.5" middle and 4.5"upper completion andreplace with conventional ESPWell History 4-½” L80 12.6# TK-15XTProduction TubingHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producerwith conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc.Nose Guide ShoeProposedDec 2024 Resman Oil/Water TracerSub #1 Interm. Casing9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD,3,457' TVD -Baker SLXPLiner Hanger/PackerSurf. Casing13-3/8", 68 #3,470' MD, 2,453'TVD81º Inc. 11,219' MD, 3426'TVD – L1 - BakerSLXP LinerHanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe withBent JointHAL 5-½” Oil SwellPacker11,437-11,454' MD,Planned Casing ExitWindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568'TVD89º Inc. Resman Oil/Water Tracer Sub#2 Resman Oil/Water TracerSub #3Item MD (ft)Resman tracer Sub #1 - ROS 683 / RWS 751 12371Resman tracer Sub #2 - ROS 682 / RWS 750 12419Resman tracer Sub #3 - ROS 681 / RWS 749 11304Item MD (ft)5-1/2" Swell Pkr #1 210875-1/2" Swell Pkr #2 202265-1/2" Swell Pkr #3 186695-1/2" Swell Pkr #4 175325-1/2" Swell Pkr #5 168615-1/2" Swell Pkr #6 152305-1/2" Swell Pkr #7 14039Item L1 MD (ft)5-1/2" Swell Pkr #1 192835-1/2" Swell Pkr #2 179805-1/2" Swell Pkr #3 167145-1/2" Swell Pkr #4 155835-1/2" Swell Pkr #5 139925-1/2" Swell Pkr #6 123635-1/2" Swell Pkr #7 11493TD20870'MD/3546'TVDTD21813'MD/3396'TVDVelocity String: PHL Packer 10' pup of 4-½” tubing,XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD~9,456' MD, ~3,207' TVD, 83° Inc, - Bottom Motor centralizerCentrilift conventional ESP~9394' MD / ~3199' TVD Discharge GaugeDate Activity8/18/2013Drill and Complete with TTC-ESP12/15/2013Pull TTC-ESP and replace withconventional ESP4/25/2019Pull ESP due to electricalfailure and replace withconventional ESP5/26/2023Pull ESP due to ESP failure,run 3.5" middle and 4.5"upper completion andreplace with conventional ESPWell History 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: _ESP Changeout___ Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number):8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 21813 feet N/A feet true vertical 3386 feet N/A feet Effective Depth measured 21130 feet 9476 feet true vertical 3596 feet 3209 feet Perforation depth Measured depth 12390-21130 feet True Vertical depth 3507-3596 feet Tubing (size, grade, measured and true vertical depth)4.5"L-80 9394' 3199' Packers and SSSV (type, measured and true vertical depth)Halliburton PHL 9476' 3209' 12. Stimulation or cement squeeze summary:N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work:Schrader Bluff 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Giorgio Iannucci Digital Signature with Date:6/9/2023 Contact Name:Amjad Chaudhry Contact Email:amjad.chaudhry@eni.com Authorized Title:Well Operations Project Manager Contact Phone:907-865-3379 323-192 Sr Pet Eng: Slotted Sr Pet Geo:Sr Res Eng: WINJ WAG 14 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Gas-Mcf MD 127 measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 1110 10935 210 1461422 151 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 488 N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: 0391283, 0388577, 0388574, 0388575 Nikaitchuq Schrader Bluff Oil Pool Eni US Operating Co. Inc. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 213-082 50-629-23492-00-00 3700 Centerpoint Drive, Ste. 500, Anchorage, AK 99503 3. Address: SP36-W5 Length 160 3470 160Conductor Surface Intermediate 20" 13.375" Size 160 9.625" Slotted 5210 6890 measured TVD Production Liner 12390 9597 Casing Structural 3507 5.5" 12390 21130 3596 Plugs Junk measured 3470 2453 Burst Collapse 2480 4790 p k ft t Fra O s 213 6. A G L PG , _ Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov annucci By Grace Christianson at 9:09 am, Jun 13, 2023 DSR-6/13/23 RBDMS JSB 071423 4-½” L80 12.6# W563 TKXT15 Production TubingHAL 5-½” Oil Swell Packer4-½” x-cplg cable clamps, for ESP Power Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producer with conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc. Nose Guide ShoeAs CompletedMay 2023 Resman Oil/Water Tracer Sub #1 Interm. Casing 9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD, 3,457' TVD - Baker SLXP Liner Hanger/PackerSurf. Casing13-3/8", 68 # 3,470' MD, 2,453' TVD81º Inc.4 ½ Swivel Joint 11,219' MD, 3426' TVD – L1 - Baker SLXP Liner Hanger/Packer5-½” Silver Bullet Ecc. Nose Guide Shoe with Bent JointHAL 5-½” Oil Swell Packer11,437-11,454' MD, Planned Casing Exit WindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568' TVD89º Inc. Resman Oil/Water Tracer Sub #2 Resman Oil/Water Tracer Sub #3Item MD(ft)ResmantracerSub#1ͲROS683/RWS751 12371ResmantracerSub#2ͲROS682/RWS75012419ResmantracerSub#3ͲROS681/RWS749 11304Item MD(ft)5Ͳ1/2"SwellPkr#1 210875Ͳ1/2"SwellPkr#2 202265Ͳ1/2"SwellPkr#3 186695Ͳ1/2"SwellPkr#4 175325Ͳ1/2"SwellPkr#5 168615Ͳ1/2"SwellPkr#6 152305Ͳ1/2"SwellPkr#7 14039ItemL1 MD(ft)5Ͳ1/2"SwellPkr#1 192835Ͳ1/2"SwellPkr#2 179805Ͳ1/2"SwellPkr#3 167145Ͳ1/2"SwellPkr#4 155835Ͳ1/2"SwellPkr#5 139925Ͳ1/2"SwellPkr#6 123635Ͳ1/2"SwellPkr#7 11493TD 20870' MD/3546' TVDTD 21813' MD/3396' TVDVelocity String: PHL Packer 10' pup of 4-½” tubing, XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD9,456' MD, 3,207' TVD, 83° Inc, - Bottom Motor cenetralizerCentrilift conventional ESP, 66 Stages Flex 47 GS3 Seals, 562XP motor9394' MD / 3199' TVD Discharge Gauge Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/12/2023 Report #: 1 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 22.4 Wind W @ 8 mph Days LTI (days) 1,224.00 Days RI (days) POB 68.0 Safety Incidents - Near Miss Date 5/12/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Working at Heights. Safety alert of the day: IADC 13-09 High pressure release results in injury. Safety drill of the day: Stripping. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Evacuation Drill 1 5/12/2023 6/9/2023 28 Rig Inspection 1 5/12/2023 5/13/2023 1 Safety Meeting 1 5/12/2023 5/13/2023 1 Spill Drill 1 5/12/2023 5/26/2023 14 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Complete Nipple up BOPE and test. Rig-up Baker Centrilift and GBR for decompletion and pull ESP as per program. 24h Summary Completed rig-up check list. Transfer 8.6 ppg 3% KCL/NaCl to rig from mud plant. Bull head down the tubing and A annulus, monitored. Install BPV and nipple down tree and nipple up BOPE. Operation at 07.00 Testing BOPE. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:00 4.00 4.00 W.O. A 2 P Continue berming around rig, perform walking/working surface inspection around rig, covering gaps in rig mating boards, installing landings on egress from rig. Check suitcase line connection, perform pressure test with air and test level alarm system, good tests. Move accumulator trailer and reinstall berming for unit, make-up accumulator hydraulic lines in rig sub. Back on High line power at 08:00 hours. 04:00 08:00 4.00 8.00 W.O. M 1 P Transfer 910 bbls. of 8.6 ppg 3% KCL/NaCl brine treated with biocide from mud plant to rig active pits. Rig-up lines and valves on tubing and A annulus for well kill, spot bleed trailer and 2” hose to trailer. Assist installing scaffolding over suitcase for access into well bays. Initial pressure on tubing 64 psi. / A annulus 45 psi. / B annulus 190 psi. 08:00 12:30 4.50 12.50 W.O. M 9 P Fluid pack lines and pressure test lines to 3500 psi. Bull head down tubing with 8.6 ppg 3% KCL/NaCl brine treated with biocide, ICP 3 bpm at 126 psi stag-up to ICP of 5 bpm at 290 psi. monitored B annulus at 210 psi. Pumped 185 bbls. with FCP 5 bpm at 255 psi. Monitored A annulus with 104 psi. / B annulus 210 psi. Switched to bull head down A annulus with 968 bbls. of 8.6 ppg 3% KCL/NaCl brine treated with biocide pumping ICP 6 bpm at 300 psi. and FCP 6 bpm at 330 psi. Monitored tubing 122 psi and B annulus 195 psi. Held ½ hour safety stand down at 11:00 hours with new drilling crew on the walking/working surfaces. 12:30 17:00 4.50 17.00 W.O. M 1 P Perform flow check for 1 hour tubing 69 psi. A annulus 68 psi. bleed off tubing / A annulus to zero psi. 17:00 19:30 2.50 19.50 W.O. C 5 P Rig down lines, valves and equipment from bull head operation. Vault rep install BPV and nipple down tree, prep tubing hanger and installing blanking plug. Set high pressure riser on well head and torque to spec. 19:30 00:00 4.50 24.00 W.O. C 5 P Nipple-up BOP stack, set stack on high pressure riser and install two sets of Choke/Kill HCR/manual valves and hose on stack. Service choke manifold. SIMOPS: load 5” TT525 drill pipe in pipe shed and strap. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1173 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1173 bbls. Gas Readings Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%) Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 882.0 Hole 897.0 Loss 1,173.0 Cumulative Mud Volumes Active Volume (bbl) 1,779.0 Hole Volume (bbl) 897.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 1,173.0 Cum Losses (bbl) 1,173.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/12/2023 Report #: 1 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Little Red Services Hot Oil Truck 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 4 Baker Hughes ESP Crew 12.00 5 Schlumberger MI Swaco WIF 12.00 5 EXPRO Flow back 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/12/2023 Consumed 1,140.0 Received 1,140.0 Returned Cum Consumed 1,140.0 Cum Received 1,140.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/12/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 198.0 Cum Received 198.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/12/2023 Consumed 1,001.0 Received 9,552.0 Returned Cum Consumed 1,001.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 8,551.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/12/2023 Consumed 22.0 Received 135.0 Returned Cum Consumed 22.0 Cum Received 135.0 Cum Returned 0.0 Cum On Loc 113.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/12/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 42.0 Cum Received 42.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/12/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 840.0 Cum Received 840.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date Tot insp. Nbr Total I.N.C. number Comment STOP Cards Submitted Company # Rpts Com ASRC 3 Observation ASRC 1 Communication Baker-Hughes 1 Environment Baker-Hughes 1 Observation Baker-Hughes 1 Procedures Baker-Hughes 1 Communication Baker-Hughes 1 Good Catch Doyon 5 Communication Doyon 5Mentoring Doyon 7 Hazard Hunt Doyon 7 Observation Doyon 5 Procedures EXPRO 1Stop Work EXPRO 2 Procedures EXPRO 1 Hazard Hunt Logistics 1 Procedures Mi-Swaco 1 Procedures Mi-Swaco 2 Communication Mi-Swaco 4 Observation Mi-Swaco 3 Hazard Hunt Mi-Swaco 1Mentoring Udelhoven 1 Communication Vault 1 Environment Worley 3 Good Catch Worley 1 Environment Worley 3Stop Work Worley 2 Procedures Worley 1 Hazard ID Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/12/2023 Report #: 1 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Worley 3 Communication General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/13/2023 Report #: 2 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 20.7 Wind E @ 21 MPH Days LTI (days) 1,225.00 Days RI (days) POB 64.0 Safety Incidents - Near Miss Date 5/13/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Change Management. Eni Golden Rules with a focus on: Confined Space. Safety alert of the day: IADC 13- 06 Poor communication amongst crew results in injury. Safety drill of the day: Well Kill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Evacuation Drill 1 5/12/2023 6/9/2023 27 Rig Inspection 2 5/13/2023 5/14/2023 1 Safety Meeting 2 5/13/2023 5/14/2023 1 Spill Drill 1 5/12/2023 5/26/2023 13 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Continue pulling out of hole with ESP assembly laying down 4-1/2” tubing. 24h Summary Complete nipple-up of BOPE and test, witnessed by Brian Bixby with AOGCC. Rig-up Baker Centrilift and GBR for decompletion and pull ESP as per program. Pull tubing hanger free and lay down, pull out hole from 9,390’ to 8,838’. Change out GBR tongs. Operation at 07.00 Pulling out of the hole with ESP assembly, laying down 4-1/2" tubing at 6,544' MD. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:00 4.00 4.00 W.O. C 5 P Continue nipple-up BOP stack, Installing upper and lower choke lines, install bell nipple, flow line to pits and drain pan covers/hoses, hook-up accumulator hydraulic lines to BOP stack. 04:00 07:30 3.50 7.50 W.O. C 5 P Pick-up 4-1/2” test joint make-up to test dart and set per Vault rep. rig-up test equipment. Fluid pack and perform shell test 3500 psi. good test. 07:30 11:30 4.00 11.50 W.O. C 12 P Test BOPE with 4-1/2” and 5” test joints to 250 psi. low/3500 psi. high for 5 minutes each, with test sequence #1-#11. Tested Annular, upper and lower pipe rams, upper and lower choke and kill lines, HCR and manual valves. Tested all valves on the choke manifold. Tested blind rams, dart valve, TIW, upper and lower IBOP on TDS. Manually/remote operated choke 2000 psi, opened and observed pressure bleed off, close at 1300 psi. Accumulator drawdown test on 4-1/2” tubular. Starting @ 3000 psi. after function 2150 psi. 200 psi. increase in 10 seconds. Full pressure recovery in 51 seconds. Nitrogen back up 10 bottles with 3800 psi. average. Tested alarms on PVT, G/L, TTG/L, F/O, & gas (LEL/H2S). All good tests. 11:30 13:00 1.50 13.00 W.O. C 5 P Pull test dart as per Vault rep and break/lay down test joint. Blow down and rig down test equipment. Pull BPV with Vault rep. 13:00 18:00 5.00 18.00 W.O. M 1 P Rig-down and move bleed trailer, mobilized GBR power pack and tubing tongs to rig and rig-up. Make-up FOSV with crossover to 4-1/2” Hydril 563 pin. Lower ESP sheaves from derrick, install environmental hose on sheave and thread ropes through both ESP and capillary sheaves, re-hang both from derrick board. 18:00 20:30 2.50 20.50 W.O. L 5 P Make-up landing joint to tubing hanger and back out lock down pins on well head as per Vault rep. Pull hanger free with 55K over, stage pick-up weight from 140K to 180K. Pull hanger to rig floor. Baker Centrilift perform conductivity and electrical on penetrator and after penetrator removed (good test). Pull out of hole to 9,390 and lay down tubing hanger and swivel jt. UP wt.=125K. 20:30 23:30 3.00 23.50 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 9,390’ to 8,838’ MD. PUW=125K. adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl Brine inhibited with Biocide. Pumping tubing volume every 3,000’. 23:30 00:00 0.50 24.00 W.O. L 5 U Change out GBR power tongs. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 50 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1223 bbls. Gas Readings Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%) Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 829.0 Hole 900.0 Loss 50.0 Cumulative Mud Volumes Active Volume (bbl) 1,729.0 Hole Volume (bbl) 900.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 50.0 Cum Losses (bbl) 1,223.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/13/2023 Report #: 2 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/13/2023 Consumed 909.0 Received 909.0 Returned Cum Consumed 2,049.0 Cum Received 2,049.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/13/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 396.0 Cum Received 396.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/13/2023 Consumed 900.0 Received 0.0 Returned Cum Consumed 1,901.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 7,651.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/13/2023 Consumed 70.0 Received 0.0 Returned Cum Consumed 92.0 Cum Received 135.0 Cum Returned 0.0 Cum On Loc 43.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/13/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 84.0 Cum Received 84.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/13/2023 Consumed 2,520.0 Received 2,520.0 Returned Cum Consumed 3,360.0 Cum Received 3,360.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date Tot insp. Nbr Total I.N.C. number Comment STOP Cards Submitted Company # Rpts Com ASRC 1 Observation ASRC 5 Communication Baker-Hughes 3 Observation Baker-Hughes 1 Good Catch Doyon 8 Procedures Doyon 2Stop Work Doyon 6 Communication Doyon 3Mentoring Doyon 7 Hazard Hunt Expro 1 Hazard ID Expro 1 Procedures GBR 1 Communication Logistics 1 Good Catch Mi-Swaco 3 Procedures Mi-Swaco 2 Communication Mi-Swaco 3 Observation Mi-Swaco 2 Hazard Hunt Mi-Swaco 1Stop Work Udelhoven 1 Communication Vault 1Stop Work Worley 2 Good Catch Worley 1 Communication Worley 2 Hazard Hunt Worley 2 Environment Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/13/2023 Report #: 2 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Worley 5 Procedures General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/14/2023 Report #: 3 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 31.8 Wind SE @ 20 MPH Days LTI (days) 1,226.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/14/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Communication. Eni Golden Rules with a focus on: Driving Safety. Safety alert of the day: IADC 12-32 Inattentiveness results in injured employees. Safety drill of the day: Fire Drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Evacuation Drill 1 5/12/2023 6/9/2023 26 Kick Drill 1 5/14/2023 5/28/2023 14 Rig Inspection 3 5/14/2023 5/15/2023 1 Safety Meeting 3 5/14/2023 5/15/2023 1 Spill Drill 2 5/14/2023 5/28/2023 14 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Mobilized and pick up 9-5/8” casing conditioning and clean out assembly per Baker reps. run in hole picking up 5” TT525 drill pipe singles from pipe shed to SLXP liner top. 24h Summary Mobilized and changed out GBR tongs. Continue pulling out of hole with ESP assembly laying down 4-1/2” tubing. Pumped tubing volumes at 6,270’ and 3,141’. Lay down ESP pump/motor assembly. Rig down decompletion equipment and GBR tongs from rig floor. Remove both sheaves from derrick. Mobilized and install wear bushing. Clean and clear rig floor. Operation at 07.00 Running in the hole with polish mill assembly at 511' MD. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 00:30 0.50 0.50 W.O. L 5 U Mobilized and change out GBR power tongs to rig floor hook-up and function test, good test. 00:30 03:30 3.00 3.50 W.O. L 4 P Pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 8,838’ to 7,008’ MD. Up wt.= 115K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 03:30 04:30 1.00 4.50 W.O. L 5 U Observed hydraulic fluid leaking from fitting on hard line on beaver slide for GBR hydraulic supply line to rig floor. Shut down and change out fitting and re-connect hose and function test (good test). 04:30 05:30 1.00 5.50 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 7,008’ to 6,270’ MD. Up wt.= 110K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. Pumping tubing volume every 3,000’. 05:30 06:30 1.00 6.50 W.O. L 9 P Rig-up high pressure hose and pump tubing volume of 95 bbls. of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, rate of 2.5 bpm at 1300 psi. 06:30 11:00 4.50 11.00 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 6,270’ to 3,141’ MD. Up wt.= 95K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. Pumping tubing volume every 3,000’. 11:00 12:00 1.00 12.00 W.O. L 9 P Rig-up high pressure hose and pump tubing volume of 48 bbls. of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, rate of 2.5 bpm at 1460 psi. 12:00 17:00 5.00 17.00 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 3,141’ to 71’ MD. Up wt.= 60K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 17:00 20:00 3.00 20.00 W.O. L 5 P Pull out laying down ESP assembly per Baker Centrilift, the discharge head to pump packed off with scale (samples collected), no pump rotation. Observed water in upper seal/lower clean oil. Tandem seals and motor free rotation. Scale on top of shroud (sample collected). Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide.20:00 23:00 3.00 23.00 W.O. L 5 P Spool ESP cable and Capillary line back to spooling unit. Rig down Baker Centrilift equipment from rig floor and GBR power tong. Continue to clean and clear rig floor of components. Remove environmental hose from ESP cable sheave and remove both sheaves out of derrick. Add 10 bbl. per hour of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 23:00 00:00 1.00 24.00 W.O. C 5 P Mobilized and install wear bushing with Vault rep (9.12” ID). Clean and clear rig floor. Add 10 bbl. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 377 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 1600 bbls. 24 Hour metal recovered = 00 lbs. Total metal recovered = 00 lbs. Gas Readings Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%) Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 628.0 Hole 939.0 Loss 377.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/14/2023 Report #: 3 Page: 2 of 3 Cumulative Mud Volumes Active Volume (bbl) 1,567.0 Hole Volume (bbl) 939.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 377.0 Cum Losses (bbl) 1,600.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/14/2023 Consumed 1,061.0 Received 1,061.0 Returned Cum Consumed 3,110.0 Cum Received 3,110.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/14/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 594.0 Cum Received 594.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/14/2023 Consumed 652.0 Received 0.0 Returned Cum Consumed 2,553.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 6,999.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/14/2023 Consumed 26.0 Received 0.0 Returned Cum Consumed 118.0 Cum Received 135.0 Cum Returned 0.0 Cum On Loc 17.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/14/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 126.0 Cum Received 126.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/14/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 4,200.0 Cum Received 4,200.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date Tot insp. Nbr Total I.N.C. number Comment STOP Cards Submitted Company # Rpts Com ACS 1 Good Catch ACS 1Mentoring ASRC 1 Observation ASRC 1Mentoring ASRC 1 Procedures ASRC 1 Hazard Hunt ASRC 2Stop Work Baker-Hughes 1Stop Work Baker-Hughes 1 Communication Doyon 4 Observation Doyon 4 Hazard Hunt Doyon 4Mentoring Doyon 5Stop Work Doyon 3 Procedures Doyon 5 Communication Doyon 1 Good Catch GBR 2 Communication GBR 2 Good Catch Logistics 1 Hazard Hunt Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/14/2023 Report #: 3 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Mi-Swaco 6 Observation Mi-Swaco 2 Procedures Mi-Swaco 1 Good Catch Mi-Swaco 3 Communication Udelhoven 1 Good Catch Vault 1 Good Catch Worley 1Stop Work Worley 2 Communication Worley 1 Environment Worley 1 Observation Worley 3 Procedures Worley 1 Unsafe Conditions Worley 1 Hazard Hunt Worley 1 Good Catch General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/15/2023 Report #: 4 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 37.4 Wind SW @ 9 MPH Days LTI (days) 1,227.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/15/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Control of Work. Eni Golden Rules with a focus on: Energized Systems. Safety alert of the day: IADC 12-26 Gloved hand caught in pipe spinner results in injury. Safety drill of the day: H2S Drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/20/2023 5 BOP Test (pressure)1 5/13/2023 5/20/2023 5 Evacuation Drill 1 5/12/2023 6/9/2023 25 Fire Drill 1 5/15/2023 5/29/2023 14 Kick Drill 1 5/14/2023 5/28/2023 13 Man Down Drill 1 5/15/2023 8/13/2023 90 Rig Inspection 4 5/15/2023 5/16/2023 1 Safety Meeting 4 5/15/2023 5/16/2023 1 Spill Drill 2 5/14/2023 5/28/2023 13 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Pull out hole and lay down BHA #1 and pick-up BHA #2 the 5-1/2” Liner Cleanout Assembly to clean out 5-1/2” liner. 24h Summary Mobilized and pick up 9-5/8” casing conditioning and clean out assembly. and single in hole with 5” TT525 drill pipe to 11,231’, pump drill pipe volume every 3,000’. Perform casing conditioning and clean out as per program. Pull out of hole to 11,169. Cut and slip drilling line. Operation at 07.00 Pulling out of the hole with BHA #1 at 2,952 MD Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 00:30 0.50 0.50 W.O. M 25 P PJSM – Service top drive, blocks and draw-works. 00:30 04:00 3.50 4.00 W.O. M 5 P Mobilized Baker 9-5/8” casing conditioning and clean out assembly to rig floor, beaver slide operation. Pick-up BHA #1 assembly. Adding 10 bbls. per hour of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 04:00 12:00 8.00 12.00 W.O. M 4 P Run in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe from 167’ to 4,422’ (3.75” OD pipe drift). Pump volume at 3,041’ pump rate 5 bpm at 500 psi. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 116K / Dn wt.= 80K. 12:00 18:00 6.00 18.00 W.O. M 4 P Continue running in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe from 4,422’ to 9,027’ (3.75” OD pipe drift). Pumping volume until pressure at 6,008 pump rate 5 bpm at 511 psi Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 155K / Dn wt.= 95K. 18:00 20:30 2.50 20.50 W.O. M 4 P Continue running in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe from 9,027’ to 11,142’ (3.75” OD pipe drift). Pumping volume until pressure at 9,060’ pump rate 5 bpm at 300 psi. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 175K / Dn wt.= 85K. 20:30 21:30 1.00 21.50 W.O. M 19 P Single in hole from 11,142’, at 30 fpm to 11,231’ and tag with 10K, no issues entering top of liner at 11,219’. Pick-up neutral weight plus 1’ mark pipe and reciprocate drill pipe from 11,213’ to 11,163’ five time, 9-5/8” casing scraper section was from 11,133’ to 11,083’, pumping 3 BPM at 400 psi. Baker run back to 11,213’ rotate to 11,231’ polishing liner top with 20 rpm @ 16K torque, tag with 10K for 2 minutes, reduce pump rate to 3 BPM at 350 psi. Pump out of hole to 11,169’. Up wt.= 175K / Dn wt.= 85K. 21:30 00:00 2.50 24.00 W.O. M 25 P Cut and slip drill line (110’). Repair grease zerk fitting on line of Brake linkage. Add 10 bbl. per hour of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 411 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2011 bbls. 24 Hour metal recovered = 00 lbs. Total metal recovered = 00 lbs. Gas Readings Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%) Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 865.0 Hole 866.0 Loss 411.0 Cumulative Mud Volumes Active Volume (bbl) 1,731.0 Hole Volume (bbl) 866.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 411.0 Cum Losses (bbl) 2,011.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/15/2023 Report #: 4 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/15/2023 Consumed 859.0 Received 859.0 Returned Cum Consumed 3,969.0 Cum Received 3,969.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/15/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 792.0 Cum Received 792.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/15/2023 Consumed 648.0 Received 0.0 Returned Cum Consumed 3,201.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 6,351.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/15/2023 Consumed 135.0 Received 135.0 Returned Cum Consumed 253.0 Cum Received 270.0 Cum Returned 0.0 Cum On Loc 17.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/15/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 168.0 Cum Received 168.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/15/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 5,040.0 Cum Received 5,040.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1Mentoring ACS 1 Observation ASRC 1 Hazard Hunt ASRC 1 Observation ASRC 1 Environment Baker-Hughes 1Mentoring Baker-Hughes 2 Procedures Baker-Hughes 2 Observation Baker-Hughes 1 Good Catch Doyon 5 Hazard Hunt Doyon 2 Good Catch Doyon 13 Communication Doyon 5 Procedures Doyon 4 Observation GBR 1 Observation Logistics 1Mentoring Mi-Swaco 5 Communication Mi-Swaco 2 Procedures Mi-Swaco 2 Observation Mi-Swaco 1 Hazard Hunt Mi-Swaco 2 Good Catch Udelhoven 1 Procedures Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/15/2023 Report #: 4 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Vault 1 Hazard ID Worley 1 Procedures Worley 1Mentoring Worley 4 Environment Worley 4 Communication General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/16/2023 Report #: 5 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 21.7 Wind N @ 10 MPH Days LTI (days) 1,228.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/16/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Fire safety. Safety alert of the day: IADC 12-22, falling steel plate results in struck by incident. Safety drill of the day: Kick while drilling. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/20/2023 4 BOP Test (pressure)1 5/13/2023 5/20/2023 4 Evacuation Drill 1 5/12/2023 6/9/2023 24 Fire Drill 1 5/15/2023 5/29/2023 13 H2S Drill 1 5/16/2023 5/30/2023 14 Kick Drill 2 5/16/2023 5/30/2023 14 Man Down Drill 1 5/15/2023 8/13/2023 89 Rig Inspection 5 5/16/2023 5/17/2023 1 Safety Meeting 5 5/16/2023 5/17/2023 1 Spill Drill 2 5/14/2023 5/28/2023 12 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Wash down with polish mill assembly and set weight on brass tattle tale. Pull up to neutral weighty and one foot and mark. Circulate and reciprocating for 1 hour. Pull out of hole and lay down BHA. 24h Summary Complete cut and slip of drill line. Pull out hole from 11,169’ and lay down BHA #1. Pick-up BHA #2 the 5-1/2” Liner Cleanout Assembly to clean out 5-1/2” liner. Run in hole to 10,810’. Rotate and circulate from 10,810 to 11,206’ MD. Work through restriction between 11,206’ and 11,198’ and pull out of hole to 10,784’ MD. Wash from 10,784 to 11,153’ MD. Operation at 07.00 Pulling out of the hole with Baker clean out assembly at 1,569' MD. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 01:00 1.00 1.00 W.O. M 25 P Complete cut and slip and calibrate block height. Perform drop inspection Service top drive, blocks and draw-works. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 01:00 08:00 7.00 8.00 W.O. M 4 P Pull out of hole from 11,169’ to 167’ MD. Adding 10 bbls of 8.6 ppg brine plus displacement every hour. 08:00 09:30 1.50 9.50 W.O. M 5 P Lay down polish mill with Vacs cleanout run BHA #1 from 167’ to surface. Lay down pup joint, jars, bumper sub, pup joint, 2- magnets, scraper, pup joint, Vacs tool, and polish mill. Clean magnets and drain Vacs tool, 88 pounds of metal from magnets, ½ bbl emulsified oil sand from Vacs tool. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 09:30 11:00 1.50 11.00 W.O. M 5 P Make up cleanout run #2 in hole to 179’. Make up Polish reamer, pup joint, Vacs tool, pup joint, scraper, 3-magnets, pup joint, bumper sub, jars, pup joint and X-O. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 11:00 18:00 7.00 18.00 W.O. M 4 P Run in hole with BHA #2 on 5” TT525 drill pipe from 179’ to 10,810’ MD, loss of slack off weight. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 18:00 21:30 3.50 21.50 W.O. M 6 P Rotate and ream at 20 rpm and pump at 1 BPM in hole from 10810’ to 11,202’. Work from 11,202 to 11206’ MD. Travel restricted between 11,206’ and 11,198’ MD. Reciprocate and work through restriction. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Returns to surface at 141 BBls pumped, oil interface. 21:30 23:00 1.50 23.00 W.O. M 6 P Back ream from 11,206’ to 11,061’ MD, at 1 BPM, 10 psi, 20 rpm, TQ=15 k. Pull on elevators from 11,061 to 10,784’, PU=208 k, RTW=128 k. 23:00 00:00 1.00 24.00 W.O. M 6 P Wash and ream down from 10,784’ to 11,153’ MD, 1 BPM, 20 psi, 20 rpm, Ream down each stand and up with each stand, then stop rotary and rotation and slack off in hole. RW=129 k, PU=195 k, SO=78 k. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 338 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2349 bbls. 24 Hour metal recovered = 88 lbs. Total metal recovered = 88 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 819.0 Hole 866.0 Loss 338.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/16/2023 Report #: 5 Page: 2 of 3 Cumulative Mud Volumes Active Volume (bbl) 1,685.0 Hole Volume (bbl) 866.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 338.0 Cum Losses (bbl) 2,349.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/16/2023 Consumed 1,091.0 Received 1,091.0 Returned Cum Consumed 5,060.0 Cum Received 5,060.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/16/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 990.0 Cum Received 990.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/16/2023 Consumed 888.0 Received 0.0 Returned Cum Consumed 4,089.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 5,463.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/16/2023 Consumed 83.0 Received 135.0 Returned Cum Consumed 336.0 Cum Received 405.0 Cum Returned 0.0 Cum On Loc 69.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/16/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 210.0 Cum Received 210.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/16/2023 Consumed 420.0 Received 420.0 Returned Cum Consumed 5,460.0 Cum Received 5,460.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Procedures ACS 1Mentoring ASRC 3 Communication ASRC 1Mentoring ASRC 1 Lesson Learned ASRC 1Stop Work ASRC 4 Observation Baker-Hughes 1 Environment Baker-Hughes 1Mentoring Baker-Hughes 1 Procedures Baker-Hughes 2 Observation Doyon 3 Hazard Hunt Doyon 11 Communication Doyon 5 Procedures Doyon 1 Good Catch Doyon 2 Observation Doyon 2Mentoring GBR 1 Good Catch Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/16/2023 Report #: 5 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com GBR 1 Observation Logistics 1 Procedures Mi-Swaco 1 Environment Mi-Swaco 2 Good Catch Mi-Swaco 1Mentoring Mi-Swaco 1 Hazard Hunt Mi-Swaco 2 Communication Mi-Swaco 4 Observation Mi-Swaco 1 Procedures Other 1 Observation Udelhoven 1 Observation Vault 1 Good Catch Worley 1 Observation Worley 1Other Worley 1 Hazard Hunt Worley 1 Hazard ID Worley 1Mentoring Worley 1 Procedures Worley 1 Environment Worley 4 Communication General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/17/2023 Report #: 6 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 21.8 Wind NW @ 14 MPH Days LTI (days) 1,229.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/17/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Complacency. Eni Golden Rules with a focus on: Health management. Safety alert of the day: IADC 12-18, loose machine guarding results in injury. Safety drill of the day: Man down. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/20/2023 3 BOP Test (pressure)1 5/13/2023 5/20/2023 3 Evacuation Drill 2 5/17/2023 6/14/2023 28 Fire Drill 1 5/15/2023 5/29/2023 12 H2S Drill 1 5/16/2023 5/30/2023 13 Kick Drill 3 5/17/2023 5/31/2023 14 Man Down Drill 1 5/15/2023 8/13/2023 88 Rig Inspection 6 5/17/2023 5/18/2023 1 Safety Meeting 6 5/17/2023 5/18/2023 1 Spill Drill 2 5/14/2023 5/28/2023 11 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Continue to run in hole with cleanout run #3 and set down on liner top and tag top of liner with indicator. Pumping to clean up liner top. Pull out of hole and lay down BHA. Clean Vacs tool and access need for additional run. Make up and run in hole with BHA #4 with 2 7/8” tailpipe. Pull out of hole and lay down assembly. 24h Summary Wash down with clean out assembly from 11,153’ to 11,204’ MD. Pull out of hole with clean out run #2 from 11,204’ to surface. Clean out sand from Vacs tool and clean magnets. Make up clean out run #3 and run in hole to 11,146’ MD. Operation at 07.00 Laying down BHA # 3, Baker clean out assembly. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 01:30 1.50 1.50 W.O. M 4 P Wash down with clean out assembly from 11,153’ to 11,204’ MD, RPM=20, TQ=18 k, 1-5 BPM, 20-650 psi. Unable to ream past 11,204’. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Continue to inspect and process 3.5” tubing in pipe shed. 01:30 02:00 0.50 2.00 W.O. M 4 P Pull out of the hole while rotating from 11,204’ to 11,084’ MD at 1 BPM, 20 psi, 20 rpm. 02:00 07:00 5.00 7.00 W.O. M 4 P Pull out of hole on elevators from 11,084’ to 179’ MD. Continue adding 10 bbls per hour plus displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 07:00 12:00 5.00 12.00 W.O. M 5 P Lay down BHA cleanout run #2 from 179’ to surface. Clean magnets, remove sand from Vacs tool, clean rig floor, prep no-go sub for next run. Recover 68 LBS of fine metal from magnets. Vacs tool full of dry course sand. 12:00 12:30 0.50 12.50 W.O. M 25 P Complete MP2 work order on top drive lube pump, Drops inspection on top drive. Grease draw works, grease iron roughneck, change dies in iron roughneck. 12:30 16:00 3.50 16.00 W.O. M 1 P Clean and clear floor. Finish processing 3.5” tubing. Clean out slop tank. Change out gear oil filter on top drive. 16:00 18:00 2.00 18.00 W.O. M 5 P Mobilize mill to rig floor. Make up Vacs tool clean out run #3 and run in hole to 140’ MD. Remove 2 magnets, scraper, 9’ pup and polish mill from rig floor. 18:00 00:00 6.00 24.00 W.O. M 4 P Run in hole with cleanout run #3 on TT525 drill pipe from 140’ to 11,146’’ MD, PU=158 K, SO=103 K. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Filling pipe every 3000’. No returns. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 346 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2695 bbls. 24 Hour metal recovered = 68 lbs. Total metal recovered = 156 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 910.0 Hole 866.0 Loss 346.0 Cumulative Mud Volumes Active Volume (bbl) 1,776.0 Hole Volume (bbl) 866.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 346.0 Cum Losses (bbl) 2,695.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/17/2023 Report #: 6 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/17/2023 Consumed 951.0 Received 951.0 Returned Cum Consumed 6,011.0 Cum Received 6,011.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/17/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 1,188.0 Cum Received 1,188.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/17/2023 Consumed 900.0 Received 0.0 Returned Cum Consumed 4,989.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 4,563.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/17/2023 Consumed 52.0 Received 0.0 Returned Cum Consumed 388.0 Cum Received 405.0 Cum Returned 0.0 Cum On Loc 17.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/17/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 252.0 Cum Received 252.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/17/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 6,300.0 Cum Received 6,300.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1Mentoring ACS 1Stop Work ASRC 2 Procedures ASRC 3 Observation ASRC 2Stop Work Baker-Hughes 1 Communication Baker-Hughes 2 Procedures Baker-Hughes 2 Good Catch Baker-Hughes 2Stop Work Doyon 5 Communication Doyon 2Mentoring Doyon 10 Procedures Doyon 5 Observation Doyon 3 Hazard Hunt GBR 1 Good Catch GBR 1 Procedures Logistics 1Mentoring Mi-Swaco 3 Observation Mi-Swaco 3 Good Catch Mi-Swaco 1 Communication Mi-Swaco 4 Procedures Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/17/2023 Report #: 6 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Mi-Swaco 1 Unsafe Conditions Superior 1 Observation Vault 1 Observation Worley 2 Communication Worley 5 Procedures Worley 1 Hazard Hunt Worley 2 Observation General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/18/2023 Report #: 7 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 26.1 Wind S @ 6 MPH Days LTI (days) 1,230.00 Days RI (days) POB 67.0 Safety Incidents - Near Miss Date 5/18/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Commitment. Eni Golden Rules with a focus on: Lifting operations. Safety alert of the day: IADC 12-15, improper body placement results in injury to mouth. Safety drill of the day: Rig evacuation. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/20/2023 2 BOP Test (pressure)1 5/13/2023 5/20/2023 2 Evacuation Drill 2 5/17/2023 6/14/2023 27 Fire Drill 2 5/18/2023 6/1/2023 14 H2S Drill 1 5/16/2023 5/30/2023 12 Kick Drill 3 5/17/2023 5/31/2023 13 Man Down Drill 1 5/15/2023 8/13/2023 87 Rig Inspection 7 5/18/2023 5/19/2023 1 Safety Meeting 7 5/18/2023 5/19/2023 1 Spill Drill 2 5/14/2023 5/28/2023 10 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Pull out of hole and lay down Vacs tool BHA #4 cleanout assembly. Empty Vacs tool and clean magnet. Make up and run in hole with cleanout BHA #5 with 800’ of 2-7/8” tail pipe. Pull out of hole and lay down BHA. Run in hole with test packer. 24h Summary Run in hole with cleanout BHA #3. Set down on liner top and tag top of liner with indicator at 11,219’. Pull out of hole from 11,219’ and lay down BHA. Recover 1-¼ bbl from Vacs tool and 34 pounds of metal from magnet. Run in hole with Vacs tool cleanout BHA #4 and 2-7/8” Tailpipe to 11,625’. Pull out of from 11,625’ to 3994’ MD. Operation at 07.00 Finish laying Down BHA #4. Clean and prep floor for next run. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 01:00 1.00 1.00 W.O. M 4 P Wash and ream in hole with cleanout BHA #3 on TT525 drill pipe from 11,146’ to 11,225’ MD, Tagging Liner top at 11,219’ with brass indicator and rotating 1 minute with 10k weight, PU=158 K, SO=103 K, 20 rpm, 3-5 BPM, 162 psi. Pull up to neutral weight plus 1’. Reciprocate from 11,224’ to 11,200 for 30 minutes. No extra torque or taking weight until indicator on liner top. 01:00 05:30 4.50 5.50 W.O. M 4 P Pull out of hole standing back stands in derrick from 11,224’ to 142’. Continue adding 10 bbls per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Filling pipe every 3000’. 05:30 07:30 2.00 7.50 W.O. M 5 P PJSM and lay down BHA, Clean Vacs tool, lay down pup joint, bumper sub, jars, pup joint, clean magnet. Recovered 34 LBS of metal fines. Change out iron rough neck die blocks for smaller OD pipe, break and lay down mill, Change iron roughneck die back. Recover ¾ BBL sand and ¼ BBL of emulsified oily sands. 07:30 09:00 1.50 9.00 W.O. M 1 P Clean rig floor. De-mobilize BHA tools from rig floor, mobilize GBR power tongs, elevators and slips for 2-7/8” PH6, cross over for FOSV. 09:00 12:30 3.50 12.50 W.O. M 5 P Pick up and make up BHA #4. Run in hole from surface to 556’ MD of 2-7/8” PH6, SO=62 k. Torque each connection with GBR power tongs. 12:30 18:00 5.50 18.00 W.O. M 4 P Run in hole with Cleanout BHA #4 from 556’ to 11,177’, PU=158 K, SO=106 k. 18:00 21:00 3.00 21.00 W.O. M 4 P Wash and ream from 11,177’ to 11,625’ MD at 5 BPM, 600 psi, 10 rpm, TQ=8 k, 4-15 ft/min. No returns to surface. Pump out of hole from 11,625’ to 11,173’ MD, 5 BPM, 575 psi, 20-25 rpm. No returns to surface. 21:00 00:00 3.00 24.00 W.O. M 4 P Pull out of hole on elevators from 11,173’ to 3994’ MD. Adding 10 bbls per hour plus displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 1027 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 3722 bbls. 24 Hour metal recovered = 34 lbs. Total metal recovered = 190 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 821.0 Hole 913.0 Loss 1,027.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/18/2023 Report #: 7 Page: 2 of 3 Cumulative Mud Volumes Active Volume (bbl) 1,734.0 Hole Volume (bbl) 913.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 1,027.0 Cum Losses (bbl) 3,722.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Baker Hughes ESP Crew 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/18/2023 Consumed 1,056.0 Received 1,056.0 Returned Cum Consumed 7,067.0 Cum Received 7,067.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/18/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 1,386.0 Cum Received 1,386.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/18/2023 Consumed 816.0 Received 0.0 Returned Cum Consumed 5,805.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 3,747.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/18/2023 Consumed 74.0 Received 135.0 Returned Cum Consumed 462.0 Cum Received 540.0 Cum Returned 0.0 Cum On Loc 78.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/18/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 294.0 Cum Received 294.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/18/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 7,140.0 Cum Received 7,140.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Communication ASRC 1 Hazard Hunt ASRC 2 Procedures ASRC 1 Environment ASRC 4 Observation Baker-Hughes 3 Observation Baker-Hughes 1 Environment Baker-Hughes 1 Good Catch Baker-Hughes 1 Communication Baker-Hughes 1 Procedures Doyon 8 Communication Doyon 1 Hazard Hunt Doyon 1 Good Catch Doyon 2Stop Work Doyon 4 Observation Doyon 1Mentoring Doyon 1 At Risk Behavior Doyon 6 Procedures Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/18/2023 Report #: 7 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com GBR 1 Good Catch GBR 1 Communication Mi-Swaco 1 Procedures Mi-Swaco 1 Good Catch Mi-Swaco 10 Observation Mi-Swaco 1 Communication Superior 1 Procedures Udelhoven 1 Observation Vault 1 Procedures Worley 1Near Miss Worley 3 Communication Worley 1 Environment Worley 1Stop Work Worley 1 Hazard ID Worley 3 Procedures Worley 2 Hazard Hunt Worley 2 Observation General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/19/2023 Report #: 8 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 24.1 Wind S @ 12 MPH Days LTI (days) 1,231.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/19/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Management of change. Safety alert of the day: IADC 12-09, Tangled fall arrest cable results in fatality. Safety drill of the day: Facility evacuation. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/20/2023 1 BOP Test (pressure)1 5/13/2023 5/20/2023 1 Evacuation Drill 3 5/19/2023 6/16/2023 28 Fire Drill 2 5/18/2023 6/1/2023 13 H2S Drill 1 5/16/2023 5/30/2023 11 Kick Drill 3 5/17/2023 5/31/2023 12 Man Down Drill 1 5/15/2023 8/13/2023 86 Rig Inspection 8 5/19/2023 5/20/2023 1 Safety Meeting 8 5/19/2023 5/20/2023 1 Spill Drill 2 5/14/2023 5/28/2023 9 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Pull out of hole and lay down BHA #5. Clean Vacs tool and pipe to assess need for additional clean out run. Test BOPE with 3.5” and 5” test joints. Run in hole with packer and test casing. 24h Summary Pull out of hole with Vacs tool cleanout run #4 with 400’ of 2-7/8” tail pipe from 3994’ and lay down.. Empty Vacs tool and clean magnet. Make up and run in hole with cleanout BHA #5 with 800’ of 2-7/8” tail pipe to 12,028’. Pump out of hole at 5 BPM from 12,028’ to 11,211’ MD. Pull out of hole on elevators from 11,211’ to 9630’ MD. Operation at 07.00 Finish laying Down BHA #5. Clean and prep floor for BOPE test. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 01:30 1.50 1.50 W.O. M 4 P Pull out of hole on elevators with Clean out BHA #4, Vacs tool and 400’ of 2-7/8” tail pipe from 3994’ to 546’ MD. Adding 10 bbls per hour plus displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 01:30 03:00 1.50 3.00 W.O. M 5 P Lay down BHA, pup joint, bumper sub, jars, pup joint, Magnet, pup joint, Vacs tool, pup joint, NO-GO and cross over. Drain and clean Vacs tool and recover 1/3 BBL of emulsified oil and sand, Recover 21 pounds of metal from magnet. 03:00 07:00 4.00 7.00 W.O. M 5 P Swap elevators, Mobilize GBR power tongs to rig floor and rig up tongs. Lay down 2-7/8” pipe from 405’ to surface, recover 1.6 bbls of fine sand and emulsified crude from inside pipe above the finger valve. 07:00 09:00 2.00 9.00 W.O. M 1 P Clean rig floor after Vacs tool run. 09:00 12:00 3.00 12.00 W.O. M 5 P Make up 2-7/8” PH6 pipe torque to 4K from surface to 805’. Adding 10 BPH of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 12:00 12:30 0.50 12.50 W.O. M 20 U Loss of highline power at 12:00. Bring rig generator online and power up equipment. 12:30 14:00 1.50 14.00 W.O. M 5 P Continue to make up clean out BHA from 805’ to 955’, SO=77 k. 14:00 19:30 5.50 19.50 W.O. M 4 P Run in hole with BHA #5 from 955’ to 11,215’, PU=150 K, SO=106 k. Adding 10 BPH of brine every hour, fill pipe every 3000’. Bring highline power on to rig at 16:00. 19:30 23:00 3.50 23.00 W.O. M 4 P Wash down from 11,215’ to 12,028’, 5 BPM, 580 PSI, 15-20 ft/min, reciprocate razor back scraper 3 times from 11,207’ to 11,157’ MD. Pump out of hole at 5 BPM from 12,028’ to 11,211’ utilizing Vacs tool to clean hole, 560 psi, PU=154 k, SO=105 k. 23:00 00:00 1.00 24.00 W.O. M 4 P Pull out of hole on elevators from 11,211’ to 9630’ MD, PU=145 K, SO=105 K. Note: Highline power off from 12:00-16:00. 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 909 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 4631 bbls. 24 Hour metal recovered = 21 lbs. Total metal recovered = 211 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 904.0 Hole 876.0 Loss 909.0 Cumulative Mud Volumes Active Volume (bbl) 1,780.0 Hole Volume (bbl) 876.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 909.0 Cum Losses (bbl) 4,631.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/19/2023 Report #: 8 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 4 Schlumberger MI Swaco WIF 12.00 5 Baker Hughes ESP Crew 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/19/2023 Consumed 885.0 Received 885.0 Returned Cum Consumed 7,952.0 Cum Received 7,952.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/19/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 1,584.0 Cum Received 1,584.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/19/2023 Consumed 828.0 Received 0.0 Returned Cum Consumed 6,633.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 2,919.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/19/2023 Consumed 78.0 Received 0.0 Returned Cum Consumed 540.0 Cum Received 540.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/19/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 336.0 Cum Received 336.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/19/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 7,980.0 Cum Received 7,980.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Communication ASRC 7 Observation ASRC 1 Communication Baker-Hughes 2 Procedures Baker-Hughes 3 Observation Baker-Hughes 2Stop Work Doyon 2Mentoring Doyon 8 Communication Doyon 8 Procedures Doyon 2 Good Catch Doyon 3 Hazard Hunt GBR 1 Communication GBR 1 Observation Mi-Swaco 3 Communication Mi-Swaco 1 Unsafe Conditions Mi-Swaco 1Mentoring Mi-Swaco 4 Observation Mi-Swaco 1 Environment Mi-Swaco 2 Procedures Superior 1 Procedures Udelhoven 1 Observation Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/19/2023 Report #: 8 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Vault 1 Environment Worley 2 Environment Worley 2 Communication Worley 2Mentoring Worley 1 Good Catch Worley 4 Procedures General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/20/2023 Report #: 9 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Clear Temperature (°F) 29.8 Wind SW @ 15 MPH Days LTI (days) 1,232.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/20/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Change management. Eni Golden Rules with a focus on: Permit to work. Safety alert of the day: IADC 12-06, Struck by incident results in sprained ankle. Safety drill of the day: Spill drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 7 BOP Test (pressure)2 5/20/2023 5/27/2023 7 Evacuation Drill 3 5/19/2023 6/16/2023 27 Fire Drill 2 5/18/2023 6/1/2023 12 H2S Drill 1 5/16/2023 5/30/2023 10 Kick Drill 3 5/17/2023 5/31/2023 11 Man Down Drill 1 5/15/2023 8/13/2023 85 Rig Inspection 9 5/20/2023 5/21/2023 1 Safety Meeting 9 5/20/2023 5/21/2023 1 Spill Drill 2 5/14/2023 5/28/2023 8 Well Kill Drill 1 5/20/2023 6/3/2023 14 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Make up right hand turn Baker test packer and run in hole and set. Fill casing with brine and bleed air. Test 9-5/8” casing to 2000 psi, Unseat packer and pull out of hole. Lay down packer. Rig up to run middle completion. 24h Summary Pull out of hole on elevators from 9,630’ and lay down BHA #5. Clean Vacs tool and 2-7/8” pipe. Rig down equipment and clean floor. Rig up and test BOPE. Rig down test equipment. Make up test packer and run in hole to 1,413’ MD. Operation at 07.00 Preparing to test 9-5/8" casing with Baker test packer. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:00 4.00 4.00 W.O. M 4 P Pull out of hole on elevators from 9630’ to956’ MD, PU=145 K, SO=105 K. Adding 10 BPH and pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide. 04:00 05:30 1.50 5.50 W.O. M 5 P Lay down BHA #5, crossover, pup joint, jars, bumper sub, pup joint, magnet, pup joint, Vacs tool, pup joint, Razor back scraper, no-go dress mill and 2- crossover. Recover 14 pounds of metal fines from magnet, recover 1/3 barrel of emulsified crude and trace sand from Vacs tool. Clean and clear floor of BHA components. 05:30 14:30 9.00 14.50 W.O. M 5 P Rig up GBR power tongs to lay down 2-7/8” PH6 tail pipe. Lay down 2-7/8” pipe from 809’ to surface. No sands in pipe, emulsified oil only. Rig down and de-mobilize GBR power tongs and die box from rig floor. De-mobilize 2-7/8” tools from rig floor. Clean up floor and equipment emulsified oil and sand from trips. Adding 10 BPH of brine. 14:30 15:30 1.00 15.50 W.O. C 5 P Rig up to test BOPE. Flood system with water and purge air. Perform shell test to 3500 psi, good test. 15:30 20:30 5.00 20.50 W.O. C 12 P Test BOPE 250/3500 psi with 3-1/2” and 5” test joints, witness waived by AOGCC Guy Cook. Test gas alarms, test PVT and flow alarms. Perform accumulator draw down test. All good tests. 20:30 21:00 0.50 21.00 W.O. C 5 P Pull test plug and install wear ring, ID=9.12”. Rig down test equipment. 21:00 22:30 1.50 22.50 W.O. M 5 P PJSM, Pick up and break off cross overs from cleanout BHA. Lay down components. 22:30 23:00 0.50 23.00 W.O. M 5 P Mobilize and make up Right handed set Baker test packer BHA #6 assembly. Make up and run in hole to 16’. 23:00 00:00 1.00 24.00 W.O. M 4 P Run in hole from 16’ to 1413’ MD, SO=87 k, 70 ft/min, fill pipe every 30 stands. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 254 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 4885 bbls. 24 Hour metal recovered = 14 lbs. Total metal recovered = 225 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 641.0 Hole 930.0 Loss 4,885.0 Cumulative Mud Volumes Active Volume (bbl) 1,571.0 Hole Volume (bbl) 930.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 4,885.0 Cum Losses (bbl) 9,516.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/20/2023 Report #: 9 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 4 Schlumberger MI Swaco WIF 12.00 5 Baker Hughes ESP Crew 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/20/2023 Consumed 887.0 Received 887.0 Returned Cum Consumed 8,839.0 Cum Received 8,839.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/20/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 1,782.0 Cum Received 1,782.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/20/2023 Consumed 609.0 Received 0.0 Returned Cum Consumed 7,242.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 2,310.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/20/2023 Consumed 14.0 Received 135.0 Returned Cum Consumed 554.0 Cum Received 675.0 Cum Returned 0.0 Cum On Loc 121.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/20/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 378.0 Cum Received 378.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/20/2023 Consumed Received Returned Cum Consumed 7,980.0 Cum Received 7,980.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ASRC 1 Communication ASRC 1 Hazard ID ASRC 1Mentoring ASRC 3 Observation ASRC 1 Hazard Hunt ASRC 1 Good Catch Baker-Hughes 2 Good Catch Baker-Hughes 3 Observation Baker-Hughes 2 Procedures Baker-Hughes 1 Environment Doyon 9 Procedures Doyon 2 Observation Doyon 2 Hazard Hunt Doyon 4 Communication Doyon 3Stop Work Doyon 2Mentoring GBR 2 Observation Mi-Swaco 1 Procedures Mi-Swaco 7 Observation Mi-Swaco 1 Environment Mi-Swaco 3 Good Catch Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/20/2023 Report #: 9 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Superior 1 Good Catch Udelhoven 1 At Risk Behavior Vault 1 Communication Worley 1Near Miss Worley 1 Environment Worley 5 Procedures Worley 1 Good Catch Worley 2 Observation Worley 2 Communication General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/21/2023 Report #: 10 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 30.9 Wind S @ 5 MPH Days LTI (days) 1,233.00 Days RI (days) POB 68.0 Safety Incidents - Near Miss Date 5/21/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Communications. Eni Golden Rules with a focus on: Waste management. Safety alert of the day: IADC 12-02, Disregard for energy isolation procedures results in amputation. Safety drill of the day: Stripping drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 6 BOP Test (pressure)2 5/20/2023 5/27/2023 6 Evacuation Drill 3 5/19/2023 6/16/2023 26 Fire Drill 2 5/18/2023 6/1/2023 11 H2S Drill 1 5/16/2023 5/30/2023 9 Kick Drill 3 5/17/2023 5/31/2023 10 Man Down Drill 1 5/15/2023 8/13/2023 84 Rig Inspection 10 5/21/2023 5/22/2023 1 Safety Meeting 10 5/21/2023 5/22/2023 1 Spill Drill 3 5/21/2023 6/4/2023 14 Well Kill Drill 1 5/20/2023 6/3/2023 13 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Pull out of hole and lay down BHA #6 test packer. Rig up to run middle. Run 3-1/2” middle completion. Rig down middle completion running tools. Rig up to run 4-1/2” upper completion. 24h Summary Run in hole to 11,179’ MD set packer and test casing, test failed. Pull up hole and set packer at 11,103’ MD, test fail. Pull up to 11,039’, test fail. Slip and cut 102’ of drilling line. Pull up hole and set packer at 9610’ MD and test to 2000 psi, good test. Run in hole and set packer at 10,080’ MD, good test. Run in hole to 11,170’, set packer and test, test fail. Rig down test equipment. Pull out of hole from 11,170’ to 9,805’ MD. Operation at 07.00 Picking up middle completion, and run in the hole. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 06:30 6.50 6.50 W.O. M 4 P Run in hole from 1,413’ to 10,175’ MD, PU=148, SO=106 k, fill pipe every 30 stands. Adding 10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. 06:30 13:30 7.00 13.50 W.O. M 12 P Attempt to set packer with 35 k down weight at 11,179’, could not set packer. Pulled up hole to 11,102’ worked packer and set at 11,103’, filled annulus and line up to test backside, test failed. Pull up to 11,061’ and set down 25 k, test backside to 2000 psi staging up 500 psi increments, test failed. Set down 50 k and retest, test failed. Attempt to test at 11,044’ with center of element at 11,039’ MD. Fill annulus and allow air to migrate. Stage up pressure at .5 BPM to 800 psi, 1000 psi and up to 2000 psi, test failed. 13:30 14:00 0.50 14.00 W.O. M 4 P Run in hole with two singles from pipe shed from 11,049’ to 11,110’ MD, PU=150 k, SO=105 k. Rig down test equipment and blow down choke and kill lines. 14:00 15:30 1.50 15.50 W.O. M 25 P PJSM, slip and cut 102’ of drilling line, inspect brakes, calibrate block and hook load. 15:30 16:30 1.00 16.50 W.O. M 4 P Pull out of hole from 11,110’ to 9,615’ MD. 16:30 18:00 1.50 18.00 W.O. M 12 P With center of element at 9,610’ MD. Set packer and test casing. Fill annulus and allow air to migrate, Stage up pressure in 500 psi increments at .5 BPM to 2000 psi. Test 9 5/8” casing for 30 minutes charted, good test. 18:00 19:00 1.00 19.00 W.O. M 4 P Release packer. Run in hole from 9,616’ to 10,085’ MD, PU=150 K, SO=105 K. 19:00 20:30 1.50 20.50 W.O. M 12 P Set packer with center element at 10,080’ MD and test casing. Fill annulus and allow air to migrate, Stage up pressure in 500 psi increments at .5 BPM to 2000 psi. Test 9 5/8” casing for 30 minutes charted, good test. 20:30 21:30 1.00 21.50 W.O. M 4 P Release packer. Run in hole from 10,085’ to 11,170’ MD, PU=155, SO=104 k. 21:30 23:00 1.50 23.00 W.O. M 12 P Set packer with center of element at 11,165’MD and test casing. Fill annulus and allow air to migrate, Stage up pressure in 500 psi increments at .5 BPM to 2000 psi. Test 9-5/8” casing for 30 minutes charted, test failed. Bled off throughout each stage of pressure. Bleed off pressure and release packer. 23:00 23:30 0.50 23.50 W.O. M 5 P Rig down test equipment. Blow down surface equipment. 23:30 00:00 0.50 24.00 W.O. M 4 P Pull out of hole from 11,170’ to 9,805’ MD. PU=146 K, SO=104 k. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 373 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 5258 bbls. 24 Hour metal recovered = 0 lbs. Total metal recovered = 225 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/21/2023 Report #: 10 Page: 2 of 3 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 884.0 Hole 875.0 Loss 373.0 Cumulative Mud Volumes Active Volume (bbl) 1,759.0 Hole Volume (bbl) 875.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 373.0 Cum Losses (bbl) 5,258.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Halliburton Completion Hands 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 4 Schlumberger MI Swaco WIF 12.00 5 Baker Hughes ESP Crew 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/21/2023 Consumed 918.0 Received 918.0 Returned Cum Consumed 9,757.0 Cum Received 9,757.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/21/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 1,980.0 Cum Received 1,980.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/21/2023 Consumed 579.0 Received 0.0 Returned Cum Consumed 7,821.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 1,731.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/21/2023 Consumed 60.0 Received 0.0 Returned Cum Consumed 614.0 Cum Received 675.0 Cum Returned 0.0 Cum On Loc 61.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/21/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 420.0 Cum Received 420.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/21/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 9,240.0 Cum Received 9,240.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Hazard ID ASRC 1 Communication ASRC 1 Good Catch ASRC 1 Hazard Hunt ASRC 4 Observation Baker-Hughes 3 Procedures Baker-Hughes 1 Observation Baker-Hughes 1Mentoring Baker-Hughes 1 Hazard ID Baker-Hughes 1 Communication Doyon 2Stop Work Doyon 10 Procedures Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/21/2023 Report #: 10 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Doyon 4 Communication Doyon 1 Observation Doyon 1Mentoring Doyon 6 Hazard Hunt Doyon 1 Good Catch GBR 1 Observation GBR 1 Procedures Mi-Swaco 3 Communication Mi-Swaco 7 Observation Mi-Swaco 1 Good Catch Mi-Swaco 1Mentoring Superior 1 Procedures Udelhoven 1 Observation Vault 1 Procedures Worley 6 Procedures Worley 2 Communication Worley 2 Observation Worley 1 Good Catch General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/22/2023 Report #: 11 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Clear Temperature (°F) 33.9 Wind S @ 14 MPH Days LTI (days) 1,234.00 Days RI (days) POB 69.0 Safety Incidents - Near Miss Date 5/22/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Control of work. Eni Golden Rules with a focus on: Working at heights. Safety alert of the day: IADC 11-30, Accidental triggering of power washer results in foot injury. Safety drill of the day: Well kill drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 5 BOP Test (pressure)2 5/20/2023 5/27/2023 5 Evacuation Drill 3 5/19/2023 6/16/2023 25 Fire Drill 2 5/18/2023 6/1/2023 10 H2S Drill 1 5/16/2023 5/30/2023 8 Kick Drill 4 5/22/2023 6/5/2023 14 Man Down Drill 1 5/15/2023 8/13/2023 83 Rig Inspection 11 5/22/2023 5/23/2023 1 Safety Meeting 11 5/22/2023 5/23/2023 1 Spill Drill 3 5/21/2023 6/4/2023 13 Strip Drill 1 5/22/2023 6/19/2023 28 Well Kill Drill 1 5/20/2023 6/3/2023 12 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Continue pulling out of hole laying down drill pipe from 4,786’ MD. Rig up and run 4-1/2” upper completion. 24h Summary Pull out of hole from 9,805’ MD and lay down packer assembly. Rig up to run middle completion. Run 3-1/2” middle completion and set packer, liner top at 9,476’. Rig down middle completion running tools. Pull out of hole laying down drill pipe from 9500’ to 4786’ MD. Operation at 07.00 Pulling out of the hole with setting tools and laying down drill pipe. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:00 4.00 4.00 W.O. M 4 P PJSM, pull out of hole from 9,805’ to 16’ MD. Lay down packer assembly. Adding 10 BPH and pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. 04:00 05:30 1.50 5.50 W.O. M 5 P Change out iron rough neck die blocks, break off bull nose from packer and lay down Packer assembly from 16’ to surface. Mobilize GBR power tongs, slips, and elevators and crossovers. Rig up power tongs. 05:30 11:30 6.00 11.50 W.O. K 4 P PJSM, Pick up and run in hole to 1,789’ MD with 3-1/2” IBTM mule shoe and tubing. Pump 25 bbls of brine at 4 BPM through tubing to flush. Make up Halliburton Hanger assembly and Baker setting sleeve. 11:30 12:00 0.50 12.00 W.O. K 5 P Rig down GBR power tongs, slips and elevators and move off floor. 12:00 18:00 6.00 18.00 W.O. K 4 P Run in hole with 3-1/2” middle completion on TT525 drill pipe from 1,789’ to 11,256’ MD, PU=145 k, SO=105 K, run in at 90 ft/min. Filling pipe every 3000’. 18:00 19:30 1.50 19.50 W.O. K 9 P Drop 1.5” setting ball, circulate at 3.5 BPM, 35 psi. Slow down pumping to 1.5 BPM at 1000 strokes, 0 psi. Ball on seat at 1511 strokes. Increase pressure and observe packer set at 2200 psi, bring pressure up to 3600 psi and hold for 15 minutes. Bleed pressure off and set 25 k on packer to confirm set. Pressure back up and shear ball seat at 4900 psi. Pick up 5’ and verify release. Top of liner set at 9,476’. 19:30 00:00 4.50 24.00 W.O. K 4 P Pull out of hole laying down drill pipe to pipe shed from 9,500’ to 4,786’, PU-115 K, SO104 K. Adding 10 BPH and pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 525 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 5783 bbls. 24 Hour metal recovered = 0 lbs. Total metal recovered = 225 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 738.0 Hole 895.0 Loss 525.0 Cumulative Mud Volumes Active Volume (bbl) 1,633.0 Hole Volume (bbl) 895.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 525.0 Cum Losses (bbl) 5,783.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/22/2023 Report #: 11 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796 Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 ASRC Energy Services Company man 12.00 2 Baker Hughes Tool Hands 12.00 2 GBR Tubing services 12.00 2 Halliburton Completion Hands 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 Vault Wellhead 12.00 2 Schlumberger MI-Swaco Mud plant 12.00 4 Schlumberger MI Swaco WIF 12.00 5 Baker Hughes ESP Crew 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/22/2023 Consumed 904.0 Received 904.0 Returned Cum Consumed 10,661.0 Cum Received 10,661.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/22/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 2,178.0 Cum Received 2,178.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/22/2023 Consumed 543.0 Received 0.0 Returned Cum Consumed 8,364.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 1,188.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/22/2023 Consumed 57.0 Received 135.0 Returned Cum Consumed 671.0 Cum Received 810.0 Cum Returned 0.0 Cum On Loc 139.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/22/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 462.0 Cum Received 462.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/22/2023 Consumed 420.0 Received 420.0 Returned Cum Consumed 9,660.0 Cum Received 9,660.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Environment ASRC 2 Observation ASRC 2 Procedures ASRC 1 Hazard Hunt ASRC 1Stop Work ASRC 2 Communication Baker-Hughes 1 Communication Baker-Hughes 2 Good Catch Baker-Hughes 1 Observation Baker-Hughes 1Mentoring Baker-Hughes 3 Hazard ID Doyon 7 Communication Doyon 1 Lesson Learned Doyon 1 Observation Doyon 1Mentoring Doyon 6 Procedures Doyon 4 Good Catch Doyon 2Stop Work Doyon 1 Hazard Hunt GBR 2 Observation Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/22/2023 Report #: 11 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Halliburton 1 Good Catch Halliburton 1 Communication Mi-Swaco 1Mentoring Mi-Swaco 1 Communication Mi-Swaco 7 Observation Mi-Swaco 3 Procedures Superior 1 Procedures Udelhoven 1 Communication Vault 1 Observation Vault 1Mentoring Worley 1 Good Catch Worley 3 Communication Worley 2 Observation Worley 2 Hazard Hunt Worley 1 Procedures Worley 1 Hazard ID General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/23/2023 Report #: 12 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 37.0 Wind W @ 5 MPH Days LTI (days) 1,235.00 Days RI (days) POB 66.0 Safety Incidents - Near Miss Date 5/23/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Confined space. Safety alert of the day: IADC 11-29, Pipe used as anchorage point on rig floor becomes a projectile. Safety drill of the day: Fire drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 4 BOP Test (pressure)2 5/20/2023 5/27/2023 4 Evacuation Drill 3 5/19/2023 6/16/2023 24 Fire Drill 2 5/18/2023 6/1/2023 9 H2S Drill 1 5/16/2023 5/30/2023 7 Kick Drill 5 5/23/2023 6/6/2023 14 Man Down Drill 1 5/15/2023 8/13/2023 82 Rig Inspection 12 5/23/2023 5/24/2023 1 Safety Meeting 12 5/23/2023 5/24/2023 1 Spill Drill 3 5/21/2023 6/4/2023 12 Strip Drill 1 5/22/2023 6/19/2023 27 Well Kill Drill 2 5/23/2023 6/6/2023 14 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Finish testing cap tube and check valve. Run in hole with 4.5” upper completion from 70’. Perform electrical test every 1000’, continuously test dual cap tube. 24h Summary Continue pulling out of hole laying down drill pipe from 4,786’ to surface and lay down running tool. Run in hole 19 stands of drill pipe from derrick and pull out of hole and lay down. Rig up to run upper completion. Make up ESP assembly, shroud and cap tube. Make electrical MLE to ESP cable splice. Make electrical tests, good. Testing cap tube check valve pass through and stabilization pressures. Operation at 07.00 Run in hole with 4.5” upper completion. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 03:00 3.00 3.00 W.O. K 4 P PJSM. Pull out of hole laying down drill pipe to pipe shed from 4,786’ to 1760’. PU-98 K, SO-100 K. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. 03:00 03:30 0.50 3.50 W.O. K 25 P Service pipe skate-replace kicker control switch. 03:30 05:30 2.00 5.50 W.O. K 4 P Pull out of hole laying down drill pipe to pipe shed from 1760’ to surface. Clear floor of running tool and crossovers. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands. 05:30 08:00 2.50 8.00 W.O. K 4 P Make up mule shoe and run in hole with 19 stands of drill pipe from derrick to 1,740’ MD. Pull out of hole from 1,740’ laying down drill pipe to pipe shed. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 08:00 14:00 6.00 14.00 W.O. K 20 P Clear and clean floor. Mobilize equipment for running tubing and ESP assembly. Stage tubing hanger and swivel joint. Hang sheaves in derrick. Stage clamps, job boxes and handling equipment. Mobilize power tongs to rig floor and rig up tongs. Pull ESP cable and dual cap lines through sheaves in derrick. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 14:00 17:00 3.00 17.00 W.O. K 5 P Make up ESP assembly. Check free rotation on all component. Service and fill with oil - motor, seal section, tubing cross over bearing system. Check and fill cap vent and drain plug tightness. ENI Co-man witness. 17:00 18:00 1.00 18.00 W.O. K 20 P Rig up GBR power tongs. Make up shroud. 18:00 19:30 1.50 19.50 W.O. K 5 P Install Dual cap tube and check valves. Connect discharge line to motor gauge. Plug in MLE into motor pothead. Make up shroud hanger and run in hole to 70’ MD. 19:30 00:00 4.50 24.00 W.O. K 20 P Perform MLE to ESP cable splice and continuity check, ENI electrician witness. Attempt to test cap tube pressure and check valve. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 237 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 6020 bbls. 24 Hour metal recovered = 0 lbs. Total metal recovered = 225 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 537.0 Hole 939.5 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/23/2023 Report #: 12 Page: 2 of 3 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Loss 237.0 Cumulative Mud Volumes Active Volume (bbl) 1,476.5 Hole Volume (bbl) 939.5 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 237.0 Cum Losses (bbl) 6,020.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 ASRC Energy Services Rig clerk 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 GBR Tubing services 12.00 4 Schlumberger MI-Swaco Mud plant 12.00 4 Baker Hughes ESP Crew 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/23/2023 Consumed 617.0 Received 617.0 Returned Cum Consumed 11,278.0 Cum Received 11,278.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/23/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 2,376.0 Cum Received 2,376.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/23/2023 Consumed 440.0 Received 0.0 Returned Cum Consumed 8,804.0 Cum Received 9,552.0 Cum Returned 0.0 Cum On Loc 748.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/23/2023 Consumed 70.0 Received 0.0 Returned Cum Consumed 741.0 Cum Received 810.0 Cum Returned 0.0 Cum On Loc 69.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/23/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 504.0 Cum Received 504.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/23/2023 Consumed 840.0 Received 840.0 Returned Cum Consumed 10,500.0 Cum Received 10,500.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Communication ASRC 3 Observation ASRC 2 Hazard Hunt ASRC 3 Communication Baker-Hughes 2Stop Work Baker-Hughes 3 Procedures Doyon 1Mentoring Doyon 2 Observation Doyon 3Stop Work Doyon 2 Hazard Hunt Doyon 6 Procedures Doyon 5 Communication Doyon 6 Hazard ID GBR 1 Observation GBR 1 Communication Logistics 1 Communication Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/23/2023 Report #: 12 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Mi-Swaco 5 Observation Mi-Swaco 1Stop Work Mi-Swaco 2 Communication Mi-Swaco 1 Procedures Mi-Swaco 1 Hazard Hunt Other 1Stop Work Vault 1 Observation Worley 3 Communication Worley 4 Procedures Worley 1 Hazard Hunt Worley 2 Observation Worley 2 Hazard ID General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/24/2023 Report #: 13 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 21.6 Wind NE @ 23 Days LTI (days) 1,236.00 Days RI (days) POB 65.0 Safety Incidents - Near Miss Date 5/24/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Energized systems. Safety alert of the day: BSEE 463, Adaptation and modification of tools results in injury. Safety drill of the day: H2S drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 3 BOP Test (pressure)2 5/20/2023 5/27/2023 3 Evacuation Drill 3 5/19/2023 6/16/2023 23 Fire Drill 3 5/24/2023 6/7/2023 14 H2S Drill 1 5/16/2023 5/30/2023 6 Kick Drill 5 5/23/2023 6/6/2023 13 Man Down Drill 1 5/15/2023 8/13/2023 81 Rig Inspection 13 5/24/2023 5/25/2023 1 Safety Meeting 13 5/24/2023 5/25/2023 1 Spill Drill 3 5/21/2023 6/4/2023 11 Strip Drill 1 5/22/2023 6/19/2023 26 Well Kill Drill 2 5/23/2023 6/6/2023 13 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Run in hole with 4.5” upper completion from 7,475’ to 9,456’ MD. Make up tubing hanger, swivel joint and terminate lines. Land out tubing hanger, test seals and run in lock down screws. Pull landing joint and clear floor. Nipple down BOPE. Nipple up tree. Perform passport test and pull TWC. While tripping perform electrical test every 1000’, continuously test dual cap tubes. 24h Summary Finish testing cap tube and replace #2 cap tube check valve and cap tube extension and fittings. Run in hole with 4.5” upper completion from 70’ to 7,308’ MD. Make ESP cable splice, perform all checks. Continue in hole to 7,475’ MD. Operation at 07.00 Making penetrator splice. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:30 4.50 4.50 W.O. K 25 U Trouble shoot cap tube and check valve. Pull ESP assemble up and visually inspect failed check valve fitting. Found that the cap tubing fitting above check valve leaked when pressure exceeded 2100 psi. Replace check valve assemble and 3/8” tubing, retest good. Tie in test manifold for dual cap tube lines. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 04:30 06:00 1.50 6.00 W.O. K 4 P PJSM. Start running in hole from surface to 520’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 06:00 12:00 6.00 12.00 W.O. K 4 P Continue running in hole from 520’ to 3,570’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 12:00 18:00 6.00 18.00 W.O. K 4 P Run in hole from 3,570’ to 6030’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 18:00 20:00 2.00 20.00 W.O. K 4 P Run in hole from 6030’ to 7,308’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 20:00 23:30 3.50 23.50 W.O. K 25 P Change out ESP cable spool in spool house. Perform ESP splice witnessed by ENI electrician. 23:30 00:00 0.50 24.00 W.O. K 4 P Continue to run in hole from 7,308’ To 7,475’ MD, SO=84 K. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Note: 24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 292 bbls. Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 6312 bbls. 24 Hour metal recovered = 0 lbs. Total metal recovered = 225 lbs. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/24/2023 Report #: 13 Page: 2 of 3 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 543.5 Hole 907.0 Loss 292.0 Cumulative Mud Volumes Active Volume (bbl) 1,450.5 Hole Volume (bbl) 907.0 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 292.0 Cum Losses (bbl) 6,312.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 GBR Tubing services 12.00 4 Schlumberger MI-Swaco Mud plant 12.00 4 Baker Hughes ESP Crew 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 25 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/24/2023 Consumed 1,036.0 Received 1,036.0 Returned Cum Consumed 12,314.0 Cum Received 12,314.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/24/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 2,574.0 Cum Received 2,574.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/24/2023 Consumed 566.0 Received 2,667.0 Returned Cum Consumed 9,370.0 Cum Received 12,219.0 Cum Returned 0.0 Cum On Loc 2,849.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/24/2023 Consumed 119.0 Received 135.0 Returned Cum Consumed 860.0 Cum Received 945.0 Cum Returned 0.0 Cum On Loc 85.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/24/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 546.0 Cum Received 546.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/24/2023 Consumed 420.0 Received 420.0 Returned Cum Consumed 10,920.0 Cum Received 10,920.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ACS 1 Communication ASRC 1 Environment ASRC 4 Observation ASRC 3 Communication Baker-Hughes 4 Observation Baker-Hughes 1 Communication Doyon 2 Communication Doyon 6 Hazard ID Doyon 2 Hazard Hunt Doyon 2 Observation Doyon 1Mentoring Doyon 4Stop Work Doyon 5 Procedures GBR 1 Observation Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/24/2023 Report #: 13 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com GBR 2 Communication Mi-Swaco 1Stop Work Mi-Swaco 1 Environment Mi-Swaco 7 Observation Mi-Swaco 2 Communication Other 1 Communication Udelhoven 1Stop Work Udelhoven 1 Communication Worley 3 Procedures Worley 3 Communication Worley 1 Observation Worley 1 Environment Worley 2 Hazard ID Worley 2 Hazard Hunt General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/25/2023 Report #: 14 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 23.0 Wind NE @ 23 MPH Days LTI (days) 1,237.00 Days RI (days) POB 67.0 Safety Incidents - Near Miss Date 5/25/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Commitment. Eni Golden Rules with a focus on: Fire safety . Safety alert of the day: IADC, 2-20, Back injury caused by lifting slings. Safety drill of the day: Kick while tripping drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 2 BOP Test (pressure)2 5/20/2023 5/27/2023 2 Evacuation Drill 3 5/19/2023 6/16/2023 22 Fire Drill 3 5/24/2023 6/7/2023 13 H2S Drill 2 5/25/2023 6/8/2023 14 Kick Drill 5 5/23/2023 6/6/2023 12 Man Down Drill 1 5/15/2023 8/13/2023 80 Rig Inspection 14 5/25/2023 5/26/2023 1 Safety Meeting 14 5/25/2023 5/26/2023 1 Spill Drill 3 5/21/2023 6/4/2023 10 Strip Drill 1 5/22/2023 6/19/2023 25 Well Kill Drill 2 5/23/2023 6/6/2023 12 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Prepare tubing hanger. Install tree and perform Passport test. Finish cleaning pits. Rig down suitcases. Lay liner and matting boards in front of SP10. Build matting board bridge to SP10. Remove burming around rig. Split pits and sub. Move sub to SP10. 24h Summary Run in with ESP completion from 7,475’ to bottom of shroud at 9,456’ MD and land out tubing hanger. Perform checks and tests on cable and cap tube. Empty and cleaning pits. Nipple down BOP stack and equipment. Prepare hanger to install tree. Operation at 07.00 Rig down passport test equipment. Prep to rig move. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 04:30 4.50 4.50 W.O. K 4 P PJSM. Run in hole with ESP assembly from 7475’ to 9409’, UW 120K, DW 82K, perform ESP electrical checks every 1000’, pump a tubing volume every 3000’ and maintain 1000 PSI on capillary lines. Perform ESP cable splice, landed out at 20’ up from pin on joint #184, (1834’ from surface). Note: Splice witnessed by ENI electrician. Adding 10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 04:30 06:00 1.50 6.00 W.O. K 5 P Make up swivel joint and orientate tubing hanger, install TWC and make up landing joint, cut ESPcable and prep for penetrator splice. Adding 10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 06:00 09:00 3.00 9.00 W.O. K 20 P Complete ESP cable splice to penetrator connector. Note splice witnessed by ENI electrician. Connect ESP cable to penetrator, and terminate capillary lines through tubing hanger. Test capillary voids through tubing hanger to 5000 PSI for 10 minutes all good. Perform ESP electrical checks all good, pump through capillary line, check valve opened at 4249 PSI, and closed at 2580 PSI. Blow down mud pumps, kill lines and choke manifold. Shipped fluid out of pits, emptying same. Adding 10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. 09:00 10:00 1.00 10.00 W.O. K 5 P Land tubing hanger with bottom of shroud at 9456’, UW 128K, SDW 82K. Run in lock down screws, and test tubing hanger body seals to 5000 psi for 10 minutes. Perform ESP electrical checks via umbilical, note all good. Remove landing joint, spool up ESP cable and capillary lines over sheaves back to spooling unit. 10:00 12:00 2.00 12.00 W.O. K 20 P De-mob Baker Centerlift clamp boxes, and thread protectors from rig floor. Rig down pump #3, and power down accumulator. Clean rig floor, and rig down mud pump interconnects. 12:00 16:00 4.00 16.00 W.O. K 20 P Continue to clean rig floor, clean drip pan, and de-mob equipment from rig floor. Disconnect suit case lines from rig. Empty mud pits clean pits 3 and 4. Disconnect spooling unit and change out ESP cable spool to empty spool. 16:00 22:00 6.00 22.00 W.O. C 1 P Clean out drip pan under rig floor. Remove bell nipple and flow line. Remove choke and kill HCR and manual lines. Prepare and set back BOP stack. Remove high pressure riser. Continue cleaning in pits, pill pit #2 and #5. Move suit cases from rig SP10-FN5. 22:00 00:00 2.00 24.00 W.O. C 5 P Remove high pressure riser. Clean and prepare tubing hanger for tree installation as per Vault hand. Install tree. Continue removal of suit cases. Continue cleaning pit #5 ,1, 2, pill pit 1. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 0.0 Hole 897.3 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/25/2023 Report #: 14 Page: 2 of 3 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Loss 82.0 Cumulative Mud Volumes Active Volume (bbl) 897.3 Hole Volume (bbl) 897.3 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 82.0 Cum Losses (bbl) 6,394.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Steve Lawrence ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 GBR Tubing services 12.00 4 Baker Hughes ESP Crew 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/25/2023 Consumed 708.0 Received 708.0 Returned Cum Consumed 13,022.0 Cum Received 13,022.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/25/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 2,772.0 Cum Received 2,772.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/25/2023 Consumed 658.0 Received 0.0 Returned Cum Consumed 10,028.0 Cum Received 12,219.0 Cum Returned 0.0 Cum On Loc 2,191.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/25/2023 Consumed 150.0 Received 65.0 Returned Cum Consumed 1,010.0 Cum Received 1,010.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/25/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 588.0 Cum Received 588.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/25/2023 Consumed 420.0 Received 420.0 Returned Cum Consumed 11,340.0 Cum Received 11,340.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ASRC 2 Communication ASRC 1Stop Work ASRC 5 Observation ASRC 1 Good Catch Baker-Hughes 2 Communication Baker-Hughes 1 Observation Doyon 1Mentoring Doyon 2 Hazard Hunt Doyon 2 Observation Doyon 9 Hazard Id Doyon 4 Procedures Doyon 4 Communication Doyon 1Stop Work GBR 1 Procedures GBR 2 Communication GBR 1 Observation Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/25/2023 Report #: 14 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Little Red Services 1 Procedures Little Red Services 1 Communication Little Red Services 1Stop Work Logistics / Beacon 1 Communication MI-Swaco 3 Communication MI-Swaco 1Stop Work MI-Swaco 6 Observation MI-Swaco 1 Procedures MI-Swaco 1 Environment Other 1 Communication Udelhoven 1 Procedures Udelhoven 1 Observation Vault 1 Hazard Hunt Vault 1Stop Work Vault 1 Observation Worley 3 Observation Worley 2 Hazard Hunt Worley 2 Hazard Id Worley 8 Communication Worley 5 Procedures General Notes Comment: Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/26/2023 Report #: 15 Page: 1 of 3 Well Header Permit/Concession N° ADL-388583 Operator ENI PETROLEUM Subsidiary ENI Petroleum Co. Inc. Initial Lahee Code DEVELOPMENT WELL Rotary Table Elevation (ft) 53.67 Ground Level (ft) 13.09 First Flange (ft) 16.82 RKB - Base Flange (ft) 36.85 RKB - Tubing Spool (ft) 31.94 Rigs Rig Name RIG 15 Contractor DOYON Rig Type LAND RIG Rig Num 0723 Rig Start Date 5/10/2023 Rig Release Date Daily Information Weather Overcast Temperature (°F) 24.8 Wind NE @ 23 MPH Days LTI (days) 1,238.00 Days RI (days) POB 68.0 Safety Incidents - Near Miss Date 5/26/2023 Category Type Subtype Severity Cause Lost time? No Comment HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Health management. Safety alert of the day: SCS 2023-05, unauthorized removal of insulation. Safety drill of the day: Man down drill. Safety Drills Type # Occur Last Date Next Date Days Until Next Check (days) Authority Visit 1 5/13/2023 5/27/2023 1 BOP Test (pressure)2 5/20/2023 5/27/2023 1 Evacuation Drill 3 5/19/2023 6/16/2023 21 Fire Drill 4 5/26/2023 6/9/2023 14 H2S Drill 2 5/25/2023 6/8/2023 13 Kick Drill 5 5/23/2023 6/6/2023 11 Man Down Drill 1 5/15/2023 8/13/2023 79 Rig Inspection 15 5/26/2023 5/27/2023 1 Safety Meeting 15 5/26/2023 5/27/2023 1 Spill Drill 3 5/21/2023 6/4/2023 9 Strip Drill 1 5/22/2023 6/19/2023 24 Well Kill Drill 2 5/23/2023 6/6/2023 11 Casings seat Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013 CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013 LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013 Last Cementing Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment: Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com 1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Floats held. CIP @ 1700 hrs. Job Information Job Phase WORKOVER Planned Start Date 5/12/2023 00:00 Start Date 5/12/2023 00:00 End Date 5/27/2023 00:00 P50 Duration (days) 15.00 Daily Summary Operations 24h Forecast Spot and shim pits. Rig up interconnects. Lower stompers and skid floor to drill position. Spot pump #3. Burm around rig. Take on brine. Bullhead and kill well. Monitor well to ensure dead. Set back pressure valve. Nipple down Tree. Nipple up BOPE. 24h Summary Prepare hanger to install tree. Install tree and perform Passport test. Clean pits Lay liner and matting boards in front of SP10. Build matting board bridge to SP10. Remove burming around rig. Split pits and sub. Move sub to SP10. Spot and shim sub base. Last report for SP36-W5. Operation at 07.00 Spotting pump #3. Final report on SP36-W5 reporting moved to SP10-FN5. Time Log Start Time End Time Dur (hr) Cum Dur (hr)Phase Opr. Act. Plan Oper. Descr. 00:00 02:30 2.50 2.50 W.O. C 5 P Clean and prepare tubing hanger for tree installation as per Vault hand. Install tree, and test void to 5000 PSI for 10 minutes. Good test. Demob scaffolding over suit cases and roof access. Secure top drive and torque tube in rotary table. Continue removal of suit cases and continue cleaning pits. 02:30 06:00 3.50 6.00 W.O. C 12 P Rig up and perform passport tree testing. Finish moving suit cases from in front of well bay #1. Leveling the pad in front of SP10-FN5.Continue cleaning pits. 06:00 12:00 6.00 12.00 W.O. A 2 P Change over from highline power to rig power, and spool up highline cable. Lay Herculite liner, and set mats. Disconnect interconnects below rig floor. Complete rig floor skid checklist, blow down rig floor and pits, steam and water systems. Drain rig water tank, blow down rig air system, lug down top drive, flip beaver slide, skid rig floor, and raise stompers. 12:00 18:30 6.50 18.50 W.O. A 2 P PJSM. Move suit cases from rig to WIF. Continue to build bridge, separate rig. 18:30 00:00 5.50 24.00 W.O. A 2 P Turn tires and move sub down well bay to SP10 and spot. Spot and shim sub base. Extra shims needed under tires to get height needed. Lower stompers. Trim shims under sticking out from under sub base. Final report for SP36-W5. Gas Readings Avg Background Gas (%) 0.00 Max Background Gas (%) 0.00 Avg Connection Gas (%) 0.00 Max Connection Gas (%) 0.00 Avg Drill Gas (%) 0.00 Max Drill Gas (%) 0.00 Avg Trip Gas (%) 0.00 Max Trip Gas (%) 0.00 Daily Mud Volumes Tank/Addition/Loss Type Des Volume (bbl) Tank 0.0 Hole 897.3 Loss 0.0 Cumulative Mud Volumes Active Volume (bbl) 897.3 Hole Volume (bbl) 897.3 Additions (bbl) 0.0 Cum Additions (bbl) 0.0 Losses (bbl) 0.0 Cum Losses (bbl) 6,394.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative Steve Lawrence ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715 Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722 Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/26/2023 Report #: 15 Page: 2 of 3 Daily Contacts Position Contact Name Company Title Email Office Mobile Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716 Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721 Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796 Personnel Log (POB) Company Serv. Type Work H (hr) Stand-by H (hr) Count Note ASRC Energy Services Rig clerk 12.00 1 ASRC Energy Services Lift Advisor 12.00 1 ASRC Energy Services HSE 12.00 1 ASRC Energy Services SOA 12.00 1 Airswift Fueler 12.00 1 Superior Thread Rep 12.00 1 Vault Wellhead 12.00 1 ASRC Energy Services Company man 12.00 2 Schlumberger MI Swaco Mud Engineer 12.00 2 GBR Tubing services 12.00 4 Baker Hughes ESP Crew 12.00 5 Schlumberger MI Swaco WIF 12.00 5 Schlumberger MI-Swaco Mud plant 12.00 6 Worley Rig Support 12.00 11 Doyon Onshore Rig 12.00 26 BOP Stack & Components Description BOP Stack Start Date 1/8/2023 Last Certification Date 12/13/2019 Pressure Rating (psi) 5,000.0 Type Make Model ID Nom (in) P Range (psi) Last Cert Date Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019 Slow Circulation Rates Pump Number: Make:Model: Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi) Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm) Daily Bulk Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note: Date 5/26/2023 Consumed 1,020.0 Received 1,020.0 Returned Cum Consumed 14,042.0 Cum Received 14,042.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note: Date 5/26/2023 Consumed 198.0 Received 198.0 Returned Cum Consumed 2,970.0 Cum Received 2,970.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note: Date 5/26/2023 Consumed 776.0 Received 0.0 Returned Cum Consumed 10,804.0 Cum Received 12,219.0 Cum Returned 0.0 Cum On Loc 1,415.0 Note Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note: Date 5/26/2023 Consumed 107.0 Received 0.0 Returned Cum Consumed 1,117.0 Cum Received 1,010.0 Cum Returned 0.0 Cum On Loc -107.0 Note Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note: Date 5/26/2023 Consumed 42.0 Received 42.0 Returned Cum Consumed 630.0 Cum Received 630.0 Cum Returned 0.0 Cum On Loc 0.0 Note Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note: Date 5/26/2023 Consumed 420.0 Received 420.0 Returned Cum Consumed 11,760.0 Cum Received 11,760.0 Cum Returned 0.0 Cum On Loc 0.0 Note Last Authority Visit Date 5/13/2023 Tot insp. Nbr Total I.N.C. number Comment Witnessed by AOGCC rep Brian Bixby. STOP Cards Submitted Company # Rpts Com ASRC 2 Procedures ASRC 7 Observation ASRC 1 Unsafe Conditions ASRC 2Stop Work Baker-Hughes 1 Observation Baker-Hughes 1Stop Work Baker-Hughes 1 Procedures Doyon 1Mentoring Doyon 3 Procedures Doyon 2 Communication Doyon 7 Hazard Hunt Doyon 1Stop Work Doyon 5 Hazard ID GBR 1 Observation GBR 1 Communication Little Red 1Mentoring Logistics 1 Procedures Mi-Swaco 2 Procedures Mi-Swaco 9 Observation Mi-Swaco 1Stop Work Udelhoven 1 Observation Udelhoven 1 Communication Vault 1 Communication Vault 1 Procedures Vault 1 Hazard Hunt Worley 2 Communication Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCEI: N/A Daily Report Date: 5/26/2023 Report #: 15 Page: 3 of 3 STOP Cards Submitted Company # Rpts Com Worley 2 Procedures Worley 3 Hazard ID Worley 1Stop Work Worley 4 Observation Worley 1 Environment General Notes Comment: 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Changeout ___ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address: Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes No 9. Property Designation (Lease Number): 10. Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 21813 21130 3596 1055 N/A N/A Casing Collapse Structural Conductor Surface 2480 Intermediate 4790 Production Liner slotted Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A N/A 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Stefano Pierfelici 3/30/2023 Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: AOGCC USE ONLY Amjad Chaudhry amjad.chaudhry@eni.com 907-865-3379 Well Operations Project Manager slotted Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Tubing Size: L80 9350 4/15/2023 Nikaitchuq Schrader Bluff Oil Pool 3386 PRESENT WELL CONDITION SUMMARY STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 0391283, 0388577, 0388574, 0388575 213-082 3700 Centerpoint Drive, Ste. 500, Anchorage, AK 99503 50-629-23492-00-00 Eni US Operating Co. Inc. SP36-W5 Length Size TVDMD 6890 5210 160 2453 3507 160 3470 Burst 20" 13.375" 160 3470 Perforation Depth MD (ft): 12390 12,390-21,130 5.5" 3,507-3,596 211309597 4.5" 3596 9.625"12390 Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov 10-404 BOP test to 2500 psi Pressure test casing to 1500 psi prior to running new completion. X DSR-3/31/23BJM 4/6/23 MDG 4/7/2023 GCW 04/07/23 04/07/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.04.07 09:33:58 -08'00' RBDMS JSB 040723 3700 Centerpoint Drive Suite 500 Anchorage, Alaska 99503 Stefano Pierfelici Phone (907) 865-3320 Email: Stefano.Pierfelici@eni.com March 30th, 2023 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval for SP36-W5 Rig Workover Dear Commissioners, ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP36-W5. SP36-W5 was completed on Spy Island on August 18 th, 2013 with a conventional electric submersible pump set at a depth of 9,456 MD. This ESP producer was completed without a packer. The well was started up for production in August 2013. On April 1 st, 2019 an electrical failure occurred to the ESP failure was occurred and ESP went down. Workover was performed and well was put back on production, In March 2023 well is shut down because of a suspected ESP failure. The estimated date for beginning this work is April 15 th, 2023 Please find attached for the review of the Commission forms 10-403 and supporting documentation. If you have any questions or require further information, please contact Amjad Chaudhry at 907- 865-3379. Sincerely, Stefano Pierfelici Well Operations Project Manager SP36-W5 Workover Summary Page PTD#:213-082 Current Status Well SP36-W5 is currently down due an electric ESP failure. Scope of Work Scope of this workover is change ESP pump. General Well info Reservoir Pressure/TVD: This well is expected to have a static max bottom hole pressure of approximately 1,400 psi (3,447 TVD) during the time of workover. Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi BOP configuration: Annular/pipe/blind rams/pipe TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not performed. Intermediate prior to drill out on July 2013. Well type: Producer Estimated start date: April 15th, 2023 Drilling rig: Doyon 15 Senior Drilling Engineer Amjad Chaudhry Amjad.chaudhry@eni.com Work: 907-865-3379 Well Operations Project Manager Stefano Pierfelici Stefano.pierfelici@eni.com Work: 907-865-3320 Procedure: 1. MIRU Doyon Rig 15. 2. Kill well by using (8.6-9.3) ppg 3 % KCl kill fluid through tree. 3. Set BPV. ND tree and NU BOP and test as per AOGCC approved Sundry. 4. POOH and lay down tubing and ESP assembly. 5. MU new ESP assembly and RIH to setting depth. (Note: a possibility that we will run a middle completion with a packer and 3-1/2 or 2-7/8 tubing just below ESP setting depth to increase velocity of the fluid) 6. Land hanger and test it. 7. Install BPV and nipple down BOP. 8. NU tubing adapter and tree. 9. Pull BPV, install test plug and test tree. (5000 psi test) 10. Freezes protect through tree down IA. 11. RDMO. Below the current schematic of the well: Run test packer and Pressure test casing to 1500 psi prior to installing new completion. -bjm STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________NIKAITCHUQ SP36-W5 JBR 06/16/2023 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 Tested with 4 1/2" and 5" test joints, tested all gas alamrms and PVT's, Precharge Bottles = 36 ea. All at 1000psi each. Test Results TEST DATA Rig Rep:V. TorresOperator:Eni US Operating Co. Inc.Operator Rep:B. Simonson Rig Owner/Rig No.:Doyon 15 PTD#:2130820 DATE:5/13/2023 Type Operation:WRKOV Annular: 250/3500Type Test:INIT Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopBDB230515155910 Inspector Brian Bixby Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 4 MASP: 1055 Sundry No: 323-192 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 15 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13 5/8"P #1 Rams 1 3 1/2"x6"P #2 Rams 1 Blind/Shear P #3 Rams 1 3 1/2"x6"P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 2 3 1/8"P HCR Valves 4 3 1/8"P Kill Line Valves 2 3 1/8"P Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P2150 200 PSI Attained P10 Full Pressure Attained P51 Blind Switch Covers:PYES Bottle precharge P Nitgn Btls# &psi (avg)P10@3800 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA Annular Preventer P16 #1 Rams P9 #2 Rams P8 #3 Rams P8 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P3 HCR Kill P3      STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS JUN 0 3 2019 r% � '�- I . 1. Operations Abandon Ll Plug Perforations LJ Fracture Stimulate Li Pull Tubing s Operati6n5 Shutdown Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: _ESP Change -out_ ❑' 2. Operator Eni US Operating Co. Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 0 Exploratory ❑ Stratigraphic ❑ Service ❑ 213-082 3. Address: 3800 Centerpoint Drive, Ste. 300, Anchorage, AK 6. API Number: 99503 50-629-23492-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: 0391283, 0388577, 0388574, 0388575 SP36-W5 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Nikaitchug Schrader Bluff Oil Pool 11. Present Well Condition Summary: Total Depth measured 21813 feet Plugs measured N/A feet true vertical 3386 feet Junk measured N/A feet Effective Depth measured 21130 feet Packer measured N/A feet true vertical 3596 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Structural Conductor 160 160 160 Surface 3470 13.375' 3470 2453 5210 2480 Intermediate 12390 9.625' 12390 3507 6890 4790 Production Liner 9597 5.5" 21130 3596 Slotted Slotted Perforation depth Measured depth 12390-21130 feet True Vertical depth 3507-3596 feet Tubing (size, grade, measured and true vertical depth) 4.5 L80 9326 3192 Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Wafer -Bbl Casing Pressure Tubing Pressure Prior to well operation: 861 40 1019 0 1 274 Subsequent to operation: 1253 68 1383 -7 304 14. Attachments (required per 20 AAc 25.070, 25.o71, a 25.283) 15. Well Class after work: Daily Report of Well Operations Exploratory ❑ Development Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil E Gas L WDSPL LJ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-172 Authorized Name: Stefano Pierfelici Contact Name: Amjad Chaudhry Authorized Title: Well Operations M a er Contact Email: ami ad.chaudhrvGBeni.corn `Pro'ect Authorized Signature: Date: 06LO !L- U Contact Phone: 907-865-3379 Farm 10404 Revised 4/2017j'�' �t�4 3BDMS 4CvJUN 0 3 2019 Submit Original Only Surf. Casing 13-3/8", 68 # 370' MD, 2,453' TVD 81° Inc. 11,219' MD, 3426' TVD — L1 - Baker SLXP Liner Hanger/Packer Resman Oil/Water Trace Sub #3 11,533' MD\ 3,457' TVD - Baker SLXP Liner Hanger/ Packer _ Item LS MD ft 2" Swell Pkr#1 19283 1/2" Swell Pkr#2 17980 2" Swell Pkr#3 11/2" 16714 2" Swell Pkr #4 15583 " Swell Pkr #5 13992 2" Swell Pkr#6 12363 Swell Pkr#7 11493 4 % Swivel Joint 4'/2" L80 12.6 THW563 ppf Production Tubing 4-Y" x-cplg cable clamps, for ESP Power Cable, (1) 3/8" Chem Inj Line 9,378' MD, 3,197' TVD - Discharge Gauge Sub #M ani p®rro�eunm SP36-W5 Dual Lateral Producer with conventional ESP As Completed 04/25/2019 9,436' MD, 3,204' TVD, 831 Inc — Bottom of Motor Centralizer Centrilift, Flex47 ESP 93 stage SXD pump, 513 GSB3 seals, 250HP 562XP 200/3635/34_167/ 3030 08R motor 11,437-11,454' MD, Resman Oil/ HAL 5-1/2" Oil Swell Planned Casing Exit Water Tracer Sub Packer Window / #2 , Resman Oil/Water Sub #1 Item MD ft Resman tracer Sub #1- ROS 683 / RWS 751 123 Rosman tracer Sub #2 -ROS 682 RWS 750 1241 Rosman tracer Sub #3 -ROS 681 RWS 749 1 Field —Spy Island Interm. Casing 9-5/8", 40# HAL 5-%" Oil Swell 12,390' MD, 3,507' TVD Packer 87° Inc. Slotted Liner, 5-'/2" Silver Bullet Ecc. 5-%" 15.5 ppf Nose Guide Shoe with 20,651' MD, 3,568' Bent Joint TVD 89° Inc. TD 20870' o MD/ 3546' n TVD 5 '/_" Silver Bullet Nose Guide Sh 21813' MD/ 3396' TVD Slotted Liner, 5-1/2" 15.5 ppf 21,130' MD, 3,596' TVD 95° Inc. MD ft 1/2"#1 21087 1/2"#2 20226 aPkr#1 2" #3 18669 2"#4 17532 5- 2"r#5 16861 " #6 15230 2" swell lip 1 14039 5 '/_" Silver Bullet Nose Guide Sh 21813' MD/ 3396' TVD Slotted Liner, 5-1/2" 15.5 ppf 21,130' MD, 3,596' TVD 95° Inc. Well Name:S OR Wellbore Name: e: SP36-W5 S Well Code: 27335 ® ' Job: WORKOVER WCER Level: Daily Report Date: 411712019 Report #: 1 Page: 1 of 2 Well Header Permit/Concezai. N° eralor Subsidiary Initial Lahee Code AUwSKA ENI PETROLEUM ENI Petroleum Go re, DEVELOPMENT WELL Rotary Table Elevation (RI Ground Level th) First Flange lk) RKB-Base Flange in) RKB Tubin9 Spool(h) 53.67 32,805.12 1682 36.85 31.90 Rigs Rig Name Corrector Rig Type Rig Num RIB Start Dab 0.ig Release Oate RIG 15 DOYON LAND RIG 0]23 4n02019 Daily Information WeatherTemparaturs j -F) Wind Days LTIhays) Days Rl (tlays) POB Overcast 68 N®17 MPH 543.00 54300 90.0 Safety InCidents - Near Miss Data Category Type Subtype Severity C.... Lost time? Comment Safety Drills Days Until Nert Check Type dOccur Last Date Next Date in,) Rig Inspection1 4/1]12019 .[812019 1 Salty Mee5n9 1 4/1712019 4/1812019 1 TT H23 Drill 1 4(1]12019 7,1512019 90 Casings seat Cas.Type Do (I.) to (in) Grade Top("") Bottom NUKE) TVD Rot (kK6) Run Date ING 13318 12,42L-80 0.0 3,46.5 2.4508 71412013 CASING 9 518 6,84 L00 O O 12,350.1 3.504 8 711412013 LINER 5 112 4.83 L-00 11.502.8 21,130.0 3,594.4 7125/2013 Last Cementing Camenting sta t Data: 7/152a13 String: CASING, 12,390.1kK3 Comment: atgg Tail I Top Meas Men BM ptl(H) Cont 1 9,723.0 Acoustic Log 12,390.0 SLB last /hies M 3000 psi. Rig pump 100 bbl. 10.5 ppg MudPush 5 bpm, 340 psi, drop bull plug end SLB .,.and pump 230 batik 12.5 ppg DeepCreR cement @ 4 B ppg, 550 psi, drop top plug and kick one wl 10 ads of walar. Rig displam w, 923 able x19.4 pill LSNO mud® SB bpm, 2601820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Flak held. CIP @ 1700 his. 2 Job Information Job Phase Plennad Start Data End Dela P50 Duration (days) Japanese, WORKOas 418,201900:00 .1]201910.00 Dao Daily Summary Operations 24b Forecast Spot and dg up pit system. Skid no Som. Lower stompers. Remove traveling mat boards. Set and rig up mud pump 43, rock washer generator k5, HeRlbudon Shark. Bum In rig 2" Summary Pull sub away from NN01. Lay Hurwlge and mat boars. Center over SPW and spot sub. Stage Pik dose to sub. operation at 07.00 Continue to Moya In Rig Up. Time Log start Endtumour Time Time Due (be) (h, Phase Opc Act, I Plan Oper. Draw, 1330 1]'30 4.00 000 W.O. A 2 P PJSM, pull pe of NN -01. Prepare pad fm Haradhorn front of SP36. web Hecuba, and leymals. 1730 tS30 1.00 500 W.D. A 1 P Move over and center sub mod on SP36. 1830 2230 4.00 9.00 W.O. A 1 P Mev. sub over well bey, 5037 things to Cbc ran s"d n for lubricator cap mane An too tall above roof, wou ! not be able W sat down on mat boards. Pull away from well bay end well hand replaced spear with parted flange. lowamg be. mot time Finish laying mal boars. Stage pits close W sub 22:30 OO:Op 1.50 10.50 W.O A i P Signs sub over SP36. spot pits closer to sub. Gas Readings Avg Background Gas (°F) Max BacM9round Gas (%) Avg Connection Goa (%) Max Connection Gas (°k) Avg Drill Gas (%) Max ural Gas (%) Avg Trip Gas (%) Mex Trip use (%) Cumulative Mud Volumes Ac We Volume thin Hole Volume (bull Additiona(bbl) CUM Additions(bbl) Losses (bull Cu. Losses(bbg Daily Contacts Position Contact Name Company This Email Office Mobile Ent re,seramalive 3dmane Seaman Eni Undifing Supv. siddrilfng@enLcore 907685-0]15 Eni representalNe Mary Guarino Ent Orlin Supv. Marco.Guanno@oni.cam Enirepreumalbe Mike Grubb Em Desire, Sups. sinnlfng@ampdeSerse oom 9076854715 Eni representat. AssureaMro Tuhmo Eni Fluid Supervisor Era representative Wada Thmnas Eni Rig Client AKRIgCkhk.Doyonl 5@ercum 90]685-0]22 End represealmo, Mer Hunts, Ent HSE Eni rcpassionless Cory Houghton Eni HSE Tod Part, Justin Hays Doyen Drilling Tool Pusher rtgi5@doyondn1kng... Tool Push Einer Fle rgle Doyen Driigng Tool Push Tool Push CRICearu Doyon Drilling HSE ens®doynndelMg corn 68s07% Tool Push Isconsiparger. I Doyon Drying IHSE Personnel Log (POB) Company Be'. Type Work H(he) Stand -0y H the) Count Note yon Feed Supermtendent 12.50 0 04HIM ASRC Company Man Use 1 Culling ASRC Clam 12.50 1 Dulling ASRC BOA 12.50 1 SIO Support ASRC Crane Ar Msor 12.50 1 SID Support Heawn Media 12.50 1 SIDSuppou End Company Men 12.50 1 Drulaig Northern Oiffefd SeMaar Faster 12.50 1 SID Support Vatco(BHGE) Weighed 12.50 1 Cable, Eni Finds Supervisor 12.50 1 Dnlfng Daily Report Date: 4118/2019 Report #: 2 Page: 1 of 2 Well Header Well Name: OR Wellbore Name: me: SP3 SP36-W-W5 0, war u 141ary Initial Lahee Code Well Code: 27335 ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL Job: WORKOVER enni WCER Level: Daily Report Date: 4118/2019 Report #: 2 Page: 1 of 2 Well Header PermibConcessicn N° 0, war u 141ary Initial Lahee Code ADL -388583 ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL Pusher, Table Elevaeon (h) Grvuntl Level (ft) FEst Flange (k) RKS -Ease Flange tripRKR Tubing spool no, 53.67 32,805.12 16.82 3685 31.84 Rigs D Nome GonlracWe RIg Type ftlg Num Rig Star/ DaM Rig Release Data RIG 15 DOYON LAND RIG OT23 4/11112019 Daily Information Weather Temperature l°FI Ww% Days(days) oat's Rl (days) POS Cloudy 1.4 W @ 9 MPH 544.000 544.00 96.0 Safety incidents- Near Miss pate Category Type Subtype sevttlly Cause Lost Omer Comment Safety Grills Days Until Ne at Check Type X occur last Date next Data Itlaysl Rig Inspection 2 411012019 4/1912019 1 Safety Meeting 2 4I1W2019 411912019 I L TT H2S DrA 1 411]12019 711612019 89 Casings seat Cas. Type OD (in) IO Iinl Grade Top IftKBI Bottom MKBI TVD Bot. (fiKB) Ron Date CASING 133/8 12A2 L-80 00 3.469.5 2,4508 7/a2013 CASING 9518 BBd L80 90 12,39D.1 3,509.8 7/1a2013 LINER 5112 4.83 L-80 11,502.8 21,130.0 3,594.4 ]252013 Last Cementing Cementing StartDate: 7/152013 Stang: CASING. 12.390.1hKS Comment: atg # Top (ftKB) I Top Mesa MethCom Sbn (ftKB)12,390.0 1 9,723D ACrUSIC Log SLB test Imes is 3000 psi. Rig Pump 100 PER 10.5 ppg MudPmh @ 5 bpm. 340 psi, dreg btm plug and SLB mu and pump 230 but, 12S ppg DeepCrets cement @ 4.0 pP9, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig displace w1923 table of 9A ppg LSND mW @ M bpm, 260/ 020 Psi. Bumped plug and Pressure up to 1320 psi and hold for 10 min. Foals held. CIP @ 1700 has. 2 Job Information JOE Phase Plennetl start Date Start Date End Data PSO Duration (days) WORKOVER a&201800:00 a172p181000 99D Daily Summary Cperapons 24h Forecast Kill well. NAD well head and N/U BOPE. Test ROPE. 21U Spot pump complex, lower stompem. Spot pump #8, VFD house. Generator b5, rock washer and suit mass. Its up mud lines, electrical to mud pump #3. Rig up Inter connects. Spray down PIIS as a final clean before bringing time into pits. Hook up suit cases and build including access to VFO and generator #5. Test lines and therefor 9.0 pp0 bane Into pit from mud plant. Rig up Imes Rom ng pumps is tubing and IA. Opera6en at 07.00 Prep for WD Trans. NN ROPE Time Log End Co. our Time our (hr) (m) Phase Opt. Act Plan Quer. Descr. 02:00 2.00 2.00 W.O. A 1 P 8polpumpcomplsx. NCO 2.00 400 W.O. A 2 P Lower stamper andudd g Dor Mo wok pai 16:30 12.50 16.50 W O. A 1 P Remove top drive ag move pup secu sing for travel. Rig up tmall line, choke Ane and Samoa Imes under ng floor. Rig up mud Imes and secondary NA in pump mem IMenonmd. Plug in electrical lines between pits and sub base. Spot Pump 93. ng up mud and power Imes m pumpaQ.11 up rgpowerto shop. Insist last suitensunentam0ar. Install Choke and gas buster rGa$ stack on roof. Spot generator #6 and mW Camp WD. Install service Anes n muck washet. Stan burning abound rig. 20:00 3.50 2000 W O. A 1 P Rinse and second cleaning of mud DAs. nstail valvas on Re pump #3.Tg up .it cases. Build sceffclding around generator 95 and VFD house. Rabe luddi ing auppons in pile shed. Power up lights and camera in mttb chute. Hook up skate controls to ng floor. 0000 4D0 2400 AD L 6 P Test transfer lines from mud plant to ph, Fis pita with 9. ppg bone frau mud plan. Build 16 b ils of 9 0 ppg hi'is sweep for bull hmdkg annulus. Rig up lines ham ng pumps to Wbirg mW IA for mal MII operation. atl/ngs Avg Background Gas 1%) Max Background Gas 1%) Avg Cormectlon Ges 1%) Max Connection Gm (%) Avg Drill Gas I%) Max Disk Ga. (%I Avg Tap Gas (d Max Trip Gas ( ) Daily Mud Volumes TanWAtltli[ipnlLoss Type Des Volume @w) Tank 904 0 00 Loss Hole 1.044.0 Cumulative Mud Volumes Active Volume (bbl) litVowme (bbg Additions (bbl) Cum Publishers /bbl) -ase- (bw) Cum Losses (bwl 11948.0 i.OM.O 0.0 0.0 0.0 0.0 Daily Contacts Position Contact Name Company Title Email -9O-7E85 Mo. Mobile Eni representative Simone Belemmi Eni OMing Sup, Rdm1[Rg@xm..rn 715 Eni representative Marco Guarino Eni Drilling Sup, MancouGuanno@xseconn Ent represardi Mike Gmbh Ed Drilling Supv. abddling@mlCetroleum.mm 901 Enl represeMaWe Alessandro Tutano Eni Fluid Supervisor EM representax. Waite Thomas Eni Rig Clerk AKRgCbrksOayonl 5@uccom WOMBSOT22 ERI representative Mak Hubler Eni HSE EW repreasntative Cay Haughton Em HSE Tod Push Justin Hays psych Drilling Tool Pusher rirs@doyondMling.com Tod Push Einer Fbagle Doyon Drying Tod Push Tod Puah Cliff Orem Doyen Drilling HSE cosem@doyeadMilnycon 605-0796 Tool Push Scott Smmom Doyon DMAhg HSE Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4118/2019 Report #: 2 Page: 2 of 2 Personnel Log (POB) Company San. Type Work H(hr) SUVFtay H(M) Count Note Doyon Field Superintendent 1250 0 Drilling Halliburton ECO 12.50 0 Drilling ASRC Company Man 1250 1 Dnlling ASRC Ckdc 1250 1 Dnlling ASRC SOA 12.50 1 SID Support ASRC Crane Advisor 12.50 1 SID Support Beacon Medic 12.50 1 SID Support EnI Company Man 12.50 1 Drilling Northern OMeild Services Feeler 12.50 1 SID Support Voted(BHGE) WellHead 12.50 1 Drilling Eel Flultls Supervisor 12.50 1 Got, ACS Enummingmal 1250 2 SID Support Became HSE 12.50 2 SID Support Doyon Tool pushers 1250 2 Drilling Doyon HSE 12.50 2 Drilling Halliburton Mud Loggers 12.50 2 Dnding MI Swam Mud Engineer 12.50 2 Drilling SLB Cement 12.50 2 Drilling Compounds Logbfic 12.50 4 SID Support MI Swum Mud Plant 12.50 6 Drying Purcell Security 12.50 6 SID Support Ml S.U. WIF 12.508 SID Support ESS Catering 12.50 10 SID Support Jambs Truck driver l Crane operator 12.50 14 Drilling Doyon Rig Personnel 1250 25 Initial Drills, Personnel 65 BOP Stack 8 Components Description Start Dote Last Certification DatePressure Rating(MI) Type Mak¢ Model IO Npm (in) P Renge (pad,last Cott Date Slow Circulation Rates Pump Number: Make: Madel: Start Data I End Date Liner Size (in) Volume Per Sfmke Overrate (bbllstk) Max Pressure (Mil Date Depth IRRB) Slow Spd Simon (am) P (MI) EH (%) O Flow (Sam) Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gat Unit Slze: 1 Note: Date Consumed Recelved Returned Cum Consumetl Cum Rmeivetl Ctun Rammed Cum On tnc Note 41172019 1,2430 12430 2,on 2.4500 0.0 O.o Supply Item Dezctlpdm: Mud Sam Boilers Unit Label: Gal Unit Size: Note: Date Consumed Received Returned Cum Consumed Cum Reserved Cum Returnetl Cum On Lm Nofe 411&2019 42.0 42.0 890 840 0.0 0.0 Supply Item Descdpdom Rig Fuel Unit Labi gal us Unit Size: 1 Note: Det. Consumed Recelved Returmd Cum Cmalmned Cum Rmeivetl Cum Returned Gum On l.oc Note 41182019 1.]23.0 3.8000 3,111.0 14.586.0 0.0 116750 Supply lower Description: Rig Water Unit LabM: bbl Unit Size:1 Note: DMe Consumed Received 1amuread Cum Consumed Cum Received Cu. Returned Cum On Loc Note 411WO19 230 1.11 23.0 135.0 00 112.0 Supply lbm DesMptlon: WIF Boden Undiluted: Gel Unit Siu: Note: Data Con sumedRecelved ReWrrretl Cum Consumetl Cum Receivetl Cum Returnetl Cum On Loc Floor 4/1812019 198.0 198.0 388.0 3%,0 0.0 0.0 Supply Item Description: WIF Injected Dorsal Und Labid: Gal Unit Sin: Note: Dale Consumed Receivetl Relumed Cum Consumed Cum Receivetl Cum Returned Cum On Loc Nofe 41182019 840.0 8400 1,260.0 1,2690 0.0 0.0 Last Authority Visit Date Tot imp. Nor Total I.N.C. number Comment STOP Cards Submitted Company a Rpts Cpm Doyon Drilling S PJSM'S Doyon Onlling Inc, 8 COW Doyon Dnlfng Inc. 21 We Cards Doyon DMIM, lnc. 8 HRWS MI Swam 6 HARGJSA MI Swam 8 MIT, General Notes Comment: Daily Report Date: 4/19/2079 Report #: 1 Page: 1 of 2 Well Header Well Name: SP36-W5 Wellbore Name: SP36-W-WS 0loratar Subsidiary Initial Lahee Code Well Code: 27335 aa Job: WORKOVER en II WCER Level: Daily Report Date: 4/19/2079 Report #: 1 Page: 1 of 2 Well Header Permlticoncession N° 0loratar Subsidiary Initial Lahee Code AOL -388583 ENI PETROLEUM ENI Petroleum CO. Ina DEVELOPMENT WELL Rotary Table Eleven..hi) Ground Level in) First Flange Mi RKB - Base Flange(K( RKB- Tubing OF., I-1 5367 32,805.12 16.82 mos 31.94 Rigs R{p Name Coneactor Rig Type Rig Num Rig Start Data Rig Release Date RIG is DOYON LAND RIG 0723 41102019 Daily Information WeatherTemperature PF) Wind Days LTI(days) Days Ed (days) PCB Overcast 6.8 E@4MPH 545.00 545.00 1050 Safety Incidents - Near Miss Data Category Type Subtype Sevedy Cause Lost timer Comment Safety Drills Days Un(, Next Check Type pIXGm "Stoats Next Date (Slays) Rig Inspection 3 4I19I2019 42012019 t Safety Meeting 3 411W2019 42012019 1 TT Ha DMI 1 4/1]12019 ]11612019 08 Casings seat Can. Type OD lint I ID bol Grade To, QKB) I Bottom (10013) TVD Bot.(bKBI Run Data CASING 133/6 1242 L60 0.0 3.489.5 2.450.8 ]Ia203 CASING 9518 8.84 LSo 0.0 12.390.1 3,504.8 ]/14/2013 LINER 512 4.83 L-80 11,502.8 21,130.0 3,594.4 7/252013 Last( cementlng Start Data: ]/152013 Strirp: CASING, 12,390.1,08 Comment: Sign Top IRKBI I Top Meas Mean BM (RKB) Com 1 9.]23 0 011mc Log 12.380 0 SLB Last Ilnas to 3000 Pei. Rig pump 100 bbls 10.5 Mpg MudPush 5 bpm, 340 psi, drop ism plug and SLB mix and pump 230 Was 12.5 ppg DeepCrete cement @ 4.8 also. 550 poi, drop OF plug and kick out wl 10 bbls Of water. Rig displace w/ 923 bbls of 9.4 ppg -SND mud @ 513 bpm, 26W 820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min Monte held. LIP a 17N hre. 2 Job Information Job PhasePlanned Start Oats Start Dab End Data PSO Duration (days) WORKOVER a0201e MoD 4/1]1201910:00 0.00 Daily Summary Ope;mt ns 2" Forecast Finish WU SOPS. Test BOPS. Prepare to decomplete. 241h Summary Rig up lines on well head Bull head and kill wall 9.8 ppg brine. Set BW and Nipple down Vee. Nippling up BOPS. Cpersdor at 07.00 Testing ROPE Time Log Start End cum Our Time Time Dur(hr) (m) Phase ops, Act. Plan Open. Descr. woo 01:00 1 00 1.00 W.O. P 1 P Rig Upon well or bull head ipwetlin. Tess surface line b 2000 pn r 10 min. 01:00 0500 4.00 5.00 W.O. A 1 P Bull head 180 bbta of 9.8 ppg brine Slosh tubing, alleging up to 5 bpm at 800 psi dropping to 650 gni. Tubing an vacuum after pumping down tubing. Line up to Aannulus Pump 16 Not 98 ppg hi -vis pill and shin chasing with 98 ppg bone staging up to 6 bpm .1 450 psi dropping b too pat. Annulus on vacuum after pumping. 05 VO 06 00 1.00 6.00 W.0 A 1 P Monitor Tubing and Annulus pressure. Both side slightly on vacuum. SIMOPS: spot mud engines, shark. 0690 07:30 150 7.50 W.D. A 1 P R1U lubricator and Set BPV. 0730 0830 100 850 W.O C i P RID lubricator. Remove well head off a r,. P/U high pressure eL M Vee. SIMOPS'. spot hallibu tan mud Mill unit W 30 10:00 1.50 1000 W O. C 1 Is et VG tack in BW inside tubing hanger. Imbti choke line adapter on BOP. 10:00 0000 14 00 24.00 W O. C 1 P PJSM, Set VG lack on BW inside Sher, hinges. Metati choke line aspirant, Nipple up BOPE. Set BOP sick an mon, torque bolls. Install Manual and HCR valves on choke and fill line. Build berm and spot accumulator. power up acwmulator. install primary and secondary choke and IMI lines on BOP stapK Install Accumulator hoses to BOP. Rig up May line and flow fire user. Prepare shed and sties it lift for 4 W tubing M pipe shed Remove Cmlolus from put and box up. Gas Readings Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas VAI Max Connecson Gas (Y°) Avg Ddll Gas (%) Max Ont Gas I%) Avg Tip Gae (°61 Max Trip Gas 1%) Daily Mud Volumes TanklAdditioMoss Type Oes Volume lbbg Tank 65].0 Loss 126.0 Role 19044 0 Cumulative Mud Volumes ActNe Volume (bhp Hole Velum. (660 Additions (bbl Cum AddMons MAN) Ling es, Mb0 Cum Losses (1,M) 1,701.0 1,044.0 0.0 00 126.0 126.0 Daily Contacts Position Contact Name Company Tide Ercall Office Mobile Eni representative Simone Belemmi EM Drilling Sup¢ siddMling®aol.com 907.565-0715 Eni representative Mary Guarino Eni Drilling Sup, Ma=.Guadno@eni.com Eni representative Mike Grubb Ent Drilling Supv. sidddlling@anipetraMum.com 907.605,0715 Ent representative Alessandro Tutano End Fluid Supervisor End representalne Wetle Thomas ES Rig Clerk AKRgClerksDopril 5®eni.com 90)685-0]22 End representative Mark Hubler ES HSE end representative Cory Houghton EM HSE Drilling S.N. $am Dye Doyon Drafting Field Superintendent Tool Push Justin Hays Deign Drove Tool Pusher 1g15todiymtlralin9wm Tool Push Elnef Fleagta Doyon Dulling Tial Push TOM Push Cliff Opens Doyon Drilling HSE cowens@doyonddling.com 685-07% Tod Pooh Scott Sermons jDayan Drilling HSE Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/19/2019 Report #: 3 Page: 2 of 2 Personnel Log (POB) Company Serv. Type We* HIII Standby H(or) Count Note Iliburion ECD 1250 0 Drilling ASRC Company Man 1250 1 Dtllling ASRC Clerk 1250 1 Drilling ASRC SOA 1250 1 SID Support ASRC Crane Aemor 12.50 1 SIO Support Beacon Medic 12,50 1 SID support Doyon Fent Superintendent 12.50 1 Drilling End Company Man 12.50 1 Dtllling Norham Oduld Services Fmer' 12.50 1 SID Support V.I.(BHGE) WeIIHead 12.50 1 Drilling End Finds Superveer 12.50 1 Drilling ACS Enviromental 12.50 2 SID Support Season NSE 12.50 2 SID Support Doyon Tool push.. 12.50 2 Drilling Doyon HSE 12.50 2 Drilling Helliburbn Mud Loggers 12.50 2 Dtllling MI Swaw Mud Engineer 12.50 2 Drilling SLB C .... t 12.50 2 Drilling GSR Casing Casing Service 12.50 3 Drilling Computed. Logistic 12.50 4 SID Support Baker Cenirdlift Completions 12.50 5 Drilling MI Sweco Mud Plant 12.50 6 Drilling Purcell Security 12.50 6 SID Support Ml Swam WIF 12.50 8 SID Support ESS Catering 12.50 10 SID Suppod Jawps Truck driver I Crane operator 12.50 14 Drilling Doyon Rig Personnel 12.50 25 Dtllling Total Onlling Personnel 74 BOP Stack 8 Components Description Start Data Last CetlHlCation Data Pressure Rating (psi) Type Make Model ID Nunn (I.) I PRas, last) Last Cert Dairy Slow Circulation Rates Pump Number: Make: Model: Start Dab End Data Liner Size (in) Volume Per Stroke Override(bblls*) Islas Pressure(psd) Data Depth (WB) Slow Spot Spokes lagoon) I P(ps0 EH (%) 0Flow igpm) Daily Bulk Supply Item Drucinqua to Equipment Fuel Unit Label: Gel Unitsion 1 Nob: Dale Consumed Receivetl Returned Cum Consumetl Cum Received Cum Returned Cum On L.ec Note 4/1912019 1,1670 1.i6L0 3637.0 3,63]0 0.0 0.0 Supply Itam Description: Mud Plant Boilers Unit Uml: Gal Unit Size: Note: Data Consumed I Received ReturneeCum Consumed Cum Receivetl Cum Returned Cum On Lee Note 4/1912019 42.0 42.0 126.0 126.0 00 0.0 Supply Ilam Description: Rig Fuel Unit Label: gal ua Unit size: 1 Note: Data Consumetl Receivetl Returned Cum Consumetl Cum Received Cum Returned Cum on Loc Note 4/1912019 1,9650 00 5.0760 14,566.0 0.0 9,510.0 Guppy Item Danymption: Rig Water Unit Label: tort Unit Size:1 Note: Data Consumetl Receivetl Returned Cum Consumed Cum Received Cum Returned Cum On Loc N019 4/1912019 450 135.0 680 270.0 00 202.0 Supply Ron Description: WIF Bailers Unit Label: Gal Unit Size: Note: Date Consumetl Received Rebmed Cum Consumed Cum Received Cum Returned Cum On Loc NWe 4/1912019 1980 198.0 MIND 5940 00 0.0 Supply Item Description: WIF loj.cbtl Diesel Unit Label: Gal Unit Size: Note: Oat. Consumed Received Returced Cum Consumed Lom Received Cum Returned C.0 Cu. On Loc Note 4/19,2019 6400 8400 2,1000 2,1000 0.0 LastAurnonty visit Data Tot imp. Nbr Tobi I.N.O. number Comment STOP Cards Submitter Company B RPM Com Doyon Dntldng 8 PJSM'S Doyon Dntldng toe. 21 Safe Cares Doran Dntldng Inc. 8 cow Doyon Drilling Inc. 8 HRWS Ml Swaw 6 HARCIJSA MI Swaw 8 RIWs General Notes Comment: Well Name:S OR Wellbore Name: e: SP SP36-W-WS Well Code: 27335 Job: WORKOVER ens WCERLevel: Daily Report Date: 4/20/2019 Report ft: 4 Page: 1 of 2 Well Header Pap"bCancntalon N• Operator Subsidiary Initial Lame Code HDL -3811583 ENI PETROLEUM ENI Petroleum Co. Ism DEVELOPMENT WELL Rotary Table Elesman In, Ground Le 1red Fent Flange On RKe - Base Flange Do RKB- Tubing imsed(-I 53.87 32.805.12 1682 36.05 31.94 I I Rigs Rig Name ContractorWg Type Rig Num Rig sun Date Rig Release Date RIG 15 DOYON tANORIG 0723 4fl02019 Daily Information WeatM1er Temperature(F) Wind Days LTI jdaysl Days Rl(do,.) POB Clear -94 SW 11 MPH 548.00 54fi.0o lo5.0 Safety Incidents - Near Miss Date Category Type Subtype Severity Cause Lastoaret Commend Safety Drills Days Until Neat check Type 9Occur Last Date Nest Date (days) Authodly VLad 1 4202019 412712019 7 BOP Pressure Test 1 4202019 V272019 7 Rig Inspection 4 4202019 412112019 1 Safety Meeting 4 420f20t9 42112019 1 TT H25 Drill 1 41172019 71162019 87 Casings seat Oas.Type OD (in) ID (in) Grade Top(ftKB) Bottom(ftKB) TVO Ed. RKB) Run Data IN 13&8 12.42 L-80 0.0 3,469.5 2A50.8 "'mu"' CASING 95/8 11.84 LBO 60 12,390.1 3,504 B 7/1412013 LINER 512 483 L-80 11.502.8 21,130.0 3,594.4 72512013 Last Cementing Cementing Sun Date: 7/152013 Stni CASING. 12.390,1111 Comment: NSA Top(ftKB) I Top Meas Meth Stan (final Cam 1 r"I". Log 12.390.0 SLB lest lines to 3000 psi. Rig pump 100 ober 105 ppg Mudl ® 5 bpm. NO psi, drop him plug and SLB max and pump 230 bbls 12 5 pp9 DsepCrete cement @4B ppg, 550 psi, drop top plug and kick out wl 10 bole of water. Rig [rpunm displace wf 923 bbls of 94 ppg LSND mud ® M bpm, 2601820 psi. Bumped plug and pressure up to 1320 pat and hold for 10 min. Floats held. CIP @ 1700 hn. 2 Job Information Job Phase Planned Start Bate start Dun End Date Duration (days) IPSO WORKOVER 478r20190000 411720191000 1 900 Daily ummary Operations 24h Forecast Rig up Baker end GBR. Pull tubing M1en9erwsM1 IalWing lornd. Steil d.mr,lefin, 24h Summary Mines up BOPE and bad rims Set blanking plug for pressure tesfing. Test BOPE 25013000 psi, lest assumed by Jeff Jams of AOGCC. Rig down test equipment and hlow down lines. Stan rig up of Baker ,around for dftr-carnplbmn. Operation at OT.Do Pnp for Be Completion Time Log SWrt End Cum our Time Time our lhfl IM) Phase Gen. Act. Plan Gen. Desw. woo 02:00 200 200 W.O. C 5 P Continue to nipple up near and fieser line to BOP. Install flanged spool Or place of removed Conolis. Install accumulator hoses to annular and upper rams. 0200 0630 450 6.50 W.O. C 5 P Install lower mms4 5- R Tensions. Install upper rams .5 K 5- variable rams. Replace door loatl hinge seals on bi ad shear ram doors. Install blind shear mars. Leading 4 W tubing he pipe shed 06.30 1030 400 10.50 WG. C 5 P Rig up test BOPS Makeup lestjdnt W blanking plug. Cnthwe to load pipe shed with 4'6Nbing, 10.30 1830 8.00 1850 W O. C 12 P Test 13 518- annular with 4 V test joint win 250 psi bw and 3000 psi high for 5 minutes each. Test Assumetl by deft Jones of AOGCC. lshear ms. Replaced mors. dosed rams for 5 minu r with dosing pressure at 18:30 1930 1.00 1950.W.O C 12 TiRD5 Blind rams failed. Trouble shah leak on blindra 250D psi 3 times to relax minutes. Lower dosing pressure and relent MiMr ar rem test was good. 1930 22:00 250 2200 IN . C 12 P Test pit hdinumear solve. Rig down led equipment Blow down surface lines. 22:00 ODAO 200 2400 W.O. L 1 P Remove BW. nub'm stack went down tubing. drugle9 Bakes id binar to rig floor. Prepare above W Imlalt in demck. Gas Readings Avg Background Gas (%1 Max Background Gas (%) Avg Connection Gas (•h) Max Connection Gas (b) Avg Drill Gas 1%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes TankrAddibou Loss Type Das Volume Our) Tank 6570 Loss 0.0 Hole 1 044.0 Cumulative Mud Volumes Active Volume (bbl) Hde VoIn. bbl) Additions (bullCum Additions (ver) Losses(hot) Cum Lnsea bb0 1,7010 1,044.0 00 O.D 0.0 1260 Daily Contacts position Contact Name Company True Email Office Mobile Erie mpresenWNe Simone Belemmi Em Drilling Sup¢ addslt'ni ce 9 76850715 End repreaentat. Mane Guarino Eni Drilling Supv. Meno.Guadna@ni.com Em cep er entalNe Mike Grubb End Doling Si siCdnllengl%henipebdeum.cam 907,685-0715 Ent representative Alessandro Tulano Eni Fluid Supervisor End represantalire Weds Thomas Em Rig Clark AKRIgClemmDd on15®eni.win 90760S0722 End representabof Me&Publar Eni HSE Ent representatNe Cary Haughton Em HSE Wiling Bolt. Sam Dye Doyon Grain, Ii Superintendent Tool Push Justin Hays Doyon Wiling Tool Pusher flgl5®doyaMrillengwm Tool Push Brief fkagle Doran Wiling Tool Push Well Name: SP36-WS OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/20/2019 Report #: 4 Page: 2 of 2 Daily Contacts Position Contact Name Company Tips Email Office Mobile Push Owens Dnpn Ddlllne HSE cowens�tloyon.... ..ng.com 885-079fi ToolPwh Send si erns Doyon Dulling HSE Personnel Log (POB) company Sew. Type Work H(hri Stand-byH(N) Client Note Haillhurian ECD 12.50 0 Dulling ASRC Company Man 12.50 1 Drilling ASRC Cars 12.50 1 Dnllhg ASRC SOA 12.50 1 SID Support ASRC Crane Advisor 12.50 1 SID Support Be.. Medic 12.50 1 SID Support Doyon Field Superintendent 12.50 1 Doling Eni Company Man 12.50 1 Dolling Nodharn Defend Servir<a Fuelar 12.50 1 SID Support Velco(BHGE) W@IIHead 12.50 1 Dulling Eni Fluids S,eerspor 12.50 1 Dulling ACS Eaviromenlal 12.50 2 SID Support Beawn WE 1250 2 SID Support Doyon Tool pusher, 12.50 2 Dnlling Doyon HSE 1250 2 Drilling Ha111burNn Mud Loggers 1250 2 Drilling MI Swaco Mud Engineer 12.50 2 Drilling SLB Cement 12.50 2 Drilling GBRCssllg Casing Senate 125p 3 Drilling Competarb. Logistic 12.50 4 SID Support Better Cenmlift Completions 12.50 5 Dnlling MI Swace Mud Plant1250 6 erring P" Security 1250 6 $IO Support MI SWaen WIF 12.50 8 SIDSuppod EBS Catering 1250 10 SID Support Jesobs Truck drlver l Crane operator 12.50 14 one, Doyon Rig Personnel 12.50 25 Dnghg_Total Drilling Personnel 74 BOP Stack 8 Components Description Madonna Last Certificated Data Pressure Beting(Pai) Type Make Metier ID Nom (int PRange lissil T Last Cut Data Slow Circulation Rates Pump Number: Make: Modal: Start Date End Date Liner Slee (in) Volume Per Stroke Overme (bblls&) Max Pressure (pi) Cate I Depth(aHa) Slow bpd Stroke,(spm) P(psp EHI%) 0Flow(gpm) Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gal Unit Size: 1 Note: Data C. arm Receivetl ReNrnetl Cum Conaumetl Cum Received Cum Returnee Cum Dn Loc Note 42012019 1,1950 1,135.0 4.]]2.0 4,]72.0 00 0.0 Supply Item Description: Mud Plant Bnikns Unit Labe: Gel Unit 5lze: Note: Date Conaumetl Received Retumetl Cum Conaumetl Cum Recelved Cum Returned Cum On Loc Note .019 420 4211 1660 168.0 0.0 00 Supply Item Description: Rlg Fuel Unit LaIadj6q us Unit Size: 1 Note: Data lUsak d Returned Cum Consumea Gum Receivetl Cum Returned Cum On Loc Npte Presumed 42012018 20.0 1,109.0 6,99fi.0 15,6950 0.0 8,699.0 Supply lNm Description: Rig water Ulgt label: bbl Unit Size: 1 Note: Data Consumea Receivetl Returned Cum consumed Our, Receivetl Gum Returnee Cum On Loc Note 4@012019 780 0.0 146.0 2700 0.0 124.0 Supply lNm Desduptiot: WIF Rollers Unit Label: Gal Unit Size: Note: Date Consumed Receivetl Returned UNm Corrsumed Cu. Received Cum Returned CUm On Loc Note 4/2012019 198.0 1980 17--,C 920 792.0 OU 0.0 Supply Item Descdptlon: WIF In ectetl Diesel UnRLabel: Gal Unit Size: Note: Date Conwmetl Receivetl Returned Cum Consumea Cum Recelved Cum Returned Cum Oa Les, IN. 4808019 8400 840U 2949.0 2.940.0 00 DO Last Authority Visit Date Tel loop. Nbr Total I.N.C. number on! tH 4802019 AOGOCommC Jonas wilnessed ROPE Test 4120119 STOP Cards Submitted company R Rats Com Wynn Dnllirg 7 PJSM'S Doyon Drilling Inc. 14 Sale Cams Doyon Drimng Inc. 7 COW Doyon Oohing Inc. 7 HRWS Ml swacp 8 RIR's Ml Swacc 6 HARCUSA General Notes Comment: Well Name: OR Wellbore Name: me: SP3 SP36-W-WS Well Code: 27335 eninn' Job: WORKOVER WCER Level: Daily Report Date: 412112019 Report #: 5 Page: 1 of 2 Well Header PermiVtoneeulon N' Ocerator Subsldbry Initial LaM1ee Cmee ADL -388583 ENI PETROLEUM ENI Petroleum Co Inc. DEVELOPMENT WELL Rotary TeL4e Elevation ut, umum Lwal in) First-amge(ff) RKB-Base Flange IN) RKB-Tubing Spobi(.I 5367 32.805.12 16.82 3685 3194 Rigs RIB Nema Contractor Rig Type Rig Num RIB Shirt Dad Rig Release Date RIG 15 DOYON /ANO RIG 0729 9/102018 Daily Information Weather Temperature (°F) wine Days LTI(dos) Days RI (days) POB Cloudy 50 Ntlg 11 MPH 547.00 54]00 105.0 Safety Incidents - Near Miss to Category Type Subtype Severity Cause Lost time] Comment Safety Drills Days Until Next Check Type erOccur Last Data Next Date (days) Authority Visit 1 4/202019 4272019 6 SOP Pressure Test 1 4/202019 42]2018 6 Rig Inspection 5 4121/2019 4222019 1 Safety Meeting 5 U212019 42412019 1 TT Kick While Topping Doll 242112019 4282019 7 TT H2S Dnp 1 411 7/1612019 86 Casings seat Cas.Type I Do (lot IO (in) I Grade Top(ftKB) I Bottom(hKBI I TVD But(RKB) Run UMe CA IN t3 WB 12.42 L-80 0.0 3.4685 2,450.8 71412013 CASING 9518 884 100 00 12,390.1 3.5046 7114/2013 LINER 512 4.63 LBO 11.502.8 21.1300 3,594A 7252013 Last Cementing Cementing5tart Date: 71152013 String: CASING, 12.390.IRKB Comment: St, a Top RHM) I Top Meas Meth aft (NKe) Cohn 1 9]230 Acoustic Log 12,3800 BLU teal lines to 3030 pal. Rig pump 100 bleb IDS ppg MudPush @ 5 rpm, 340 psi, drop Eton plug and SLB mix and pump 230 bible 12.5 ppg DeepCrets cement @ 4S ppg. 550 psi, dmp top plug and kick out of 10 bbh of water gas dlsdace w/ 923 bible of 9.4 ppg -SND mud ® 513 bpm. 2801820 psi. Bumped plug and pressure up to 1320 psi and hold for 10 min. Fleets held. CIP ®17W hi 2 Job Information Job Phase Planned Sure Date SON Data EM Dam P50 Duration (days) WORKCAER 4/8201800:00 4/1]201810:00 0.00 Daily Summary Opera ons 24h Forecast Pull out of hole laying down tubing. Lay down ESP assembly Make up new ESP assembly and run in hole on 126 pm tubing. 24h Summary Rig up Baker and GBR Pull Hanger w/IWK. PUH 12.6 ppf tobin9 out of hole T/3.958% pumping 10 bph into annulus and tubing volume every 300'. Change out ESP electoral spool. Total bible of 8.8 ppg bumped into .11 0. last 24 houn l- bible. Operation at 07.00 UD ESP ASSY Time Log Start End Cum Dur Time Time Durlim) the) Phase Our. Act. Plan Other. Descr. 00:00 04.00 4 OC 4 00 W O. - 1 P PJSM. Gather BHGE tools and RAJ ESP & Cap duel sheave to dmnck board Dal elephant mock. SIMOPS. install drip pan drain hoses, install clam shell around riser. Adding 10 arms of 9.8 ppg brine per hour and pumping tubing volume every 04:00 0600 2.OD 6,00 Wo. L I P PJSM. R/U GBR 4S TBG handling equipment on rig ftomr. 06 OD 07:00 100 TDO W.O. L i P Gather BHGE tomisand RlUsem�aheave roaeflas 0 denkkboanf. 07:05 1000 3 DD lobo W 0. L 4 P PJSM. RIH and N1U landing joint on Tubing Hanger. Puil Haiger WMDK to unset Pull to the rig floor and disconnect ESP & Cap lines as per SHOE and Vei rep. u0 Hanger. 10:00 16.30 6.50 16.50 W. P POOH 4.5" 12.6 p Tbg ,4t to ,365 fl and UD in shed removing IDg clamp- In rogeas. PU=100 k. 1630 1T30 1.00 17.50 W.O. L 9 P Rig up and pump tubing volume at 4 bpm 200 psi. 17:35 19:00 1.50 19.00 W O. L 4 P POOH 4.5" 12.6 ppf Tbg F/6.365' TI5.484. PU-95 k. 19:00 19.30 0.50 19.50 Wo L 20 P Replace hose an GBR tongs while restocking floor with Clamps and thread protMors. 19:30 21:30 1 2.00 2150 W 0. L 4 P 1 POO M1 Y6 ppf Tbg F15,494- TM, INS 8', PU=80 k. 2130 0000 2.50 24.00 W O. L 20 P Crange our NII elecumn spool In dismal house. Offload pipe from pipe shed Pump tubing volume of 60 SBLS at 4 SPM at 200 pet Trouble slwut spool house generator Heating issue. Adding 10 Obis of 9.8 ppg brine per hour and pumping tubing volume every 3AD0. Total dNa of 9.8 ppg pumped inlowdl line last 24 hours�40 ads. Gas Readings Avg Background Gas (%) Max Background Gas l%) Avg Connection Gas(%) Mas Correction Gas l%) Avg Drill Gas (%) Max one use (%) Avg Trip Gas (%I Max Trip Use (%) Daily Mud Volumes TanIdAddttionlLoss Type Des Volume (bbl) Tank 6490 Loss 3400 Hole 1,069.0 Cumulative Mud Volumes Active volume (bbl) Hole Volume (bbl) Adi iOons (bbl) Cum Pregame Ibbs Losses (bbl) Cum Losses (bbl) 1,]18.0 1,089.0 0.0 0.0 340.0 466.0 Daily Contacts Position Contact Name Company Title Email Office Mobile Eel representative Simone Afternoon Em Gigging Supv. aido If ngCeni.cam 9W48SW15 Eni representative Mike Grubb Enl Drilling Supv. sidddlflng�anipeboleum.com 907485-0715 SO representative Amami Tobago Phi Fluid Supervisor Enl repmeentilive Wed. Thomas Eni Rig Cledr AKRigClerksDpyonl5@eni.com 9074054722 End representative Mark Huber Ed HSE Eni representative Cory Houghton Eni FEE Well Name: SP36-W5 OR Wellbore Name: SP36-WS Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/2112019 Report #: 5 Page: 2 of 2 Daily Contacts Poseion I Contact Name Company Tilde Edell office Mobile Milling did Bath Dye Doyon Drilling Fidd Bupe ntentlant Tool Push Justin Hays Doyon Drilling Tool Posner rigl5Qtloyondelling.wm Tool Push Einer Faagle Doyon Dulling Tool Push Tool Push Oliff Owens Doyon Drilling HSE an s@doyendnlling.cpm 695-0796 Tool Push Scott Simmons Doyon Drilling HSE Personnel Log (POB) Company Slant. Type Work H Ihq Standby H Ihr) Count Note Hallibutlon ECD 1250 0 Dtllling ASRC Company Man 12.50 1 Calling ASRC Clerk 12.50 1 D lir, ASRC SOA 12.50 1 SID Support ASRC Crans Advisor 1250 1 SID Support Beason Medic 1250 1 SID Support Doyon Field Supemlendent 12.50 1 DdNng Em Company Man 1250 1 Dain Northam O'IKMid Servlcee Fueler 12.50 1 SIDSupport Vetoc(BHGE) Welland 12.50 1 Drilling Em Fluids Supervisor 12.50 1 Drilling ACS Enwromental 12.50 2 SIDSupport Season HSE 12.50 2 SID Support Detroit Tad pushers 12.50 2 Dnlling Doyon HSE 12.50 2 DdIMg HaDibudon Mud Loggers 12.50 2 Drilling MI Swaw Mud Engineer 12.50 2 Dulling SLB Cement 12.50 2 Drilling GBR Casing Casing Sands. 12.50 3 Drilling Competing. Logistic 12.50 4 SID Supped Baker Centliliff Completion. 12.50 5 Drilling MI Swaw Mutl PWM 12.50 6 Drilling Purcell Security12 6 SID Support Ml Swaw WIF S2.50 10 8 SID Supper! ESS Calmng 12.50 10 SID Suppml Jambe, Truck EdveN Cone operator 12.50 14 Miling Doyon Rig PersemeR 12.50 25 Dnlling_Total Dulling Personnel 74 BOP Stack 8 Components Description Start Dale Last Cungsatlon Date Pressure Rating lips) Type Make tootle/ IO Nor(in) PRanpe(,al) Last Cert Date Slow Circulation Rates Pump Number: Make: Mntlel: Start Dow End Data Liner Size lin) Volume Per Stroke Override (bbllsik) Max Pressure (psi) Dale I Depth loKB) Slow Set Stokes (spm) P(PSN Eff(%) 0Flow (gpm) Daily Bulk Supply Iqm Description: Equipment Fus! Unit Labet Gal Unit Size: 1 Note: Opti Consumetl Rec.had Returned Co. CansumM Cum Resolved tum Returned Cum On Loc Note 42112019 12650 1265.0 6,03].0 6,0370 00 0.0 Supply Ilam Dsseuption: Mrd Fund Begins UM Labe, Gal Unit Size: Note: Dale Consumed ReceWetl ReturnedGum Consumetl Gum Received Cum Returned Cum Oa Loc Nate 42112019 420 42.0 210.0 210.0 0.0 0.0 Supply Item D ... rip6an: Rg Fuel Unk Labee gal us Unit Size: 1 Note: Data Consumetl ReceWetl Relurnetl Lum Lonsumetl Lum Recelvetl Cum Returned Cum On Loc Note 4/21/2019 1265.0 1,265.0 &2610 16,9600 00 8.699.0 Supply Reno Deserlptlon: Rig Water UMltabeb to Unitsize: 1 Note: Dale Consumetl lRessived Relurnetl Co. Consumed Cu. Receivetl Com Relurnetl Cum On Loc Note 421/2019 34.0 loo t00D 2]0.0 00 900 Supply Item Description: WIFBoilee Uet Label Gal Unit Size: Note: Dae Consumetl Received Relurnetl Co. Consumed Cum Recelvetl Lum Relurnetl Lum On Loc Note 4218019 1960 198.0 990.(1 990.0 00 0.0 Supply lam Description: WIF Injected Desel Una Label: Gel Unit Size: Note: Dae Consumetl Recelvetl Returlmtl Cum Consumed Cum Recelvetl Cum Relurnetl Cum On Roc Nola 421/2019 420.0 4200 3.360.0 3,360.0 0.0 0.0 Last AUMOnty Visit Data TO loan. Nor Total I.N.C. number Comment 4208019 I AOGCC Jeff Jones witnessed ROPE Test 4120119 STOP Cards Submitted Company kRpq Com Doyon Drilling 10 PJSMG Doyon Driving Inc. 25 Safe Cards Doyon Drilling Inc. 10 cow Doyon Drilling Inc. 10 HRWS Wigwam 8 per. Ml Swaw 6 HARMJSA General Notes Comment. Well Name:S OR I� Wellbore Name: e: SP SP36-W-WS Well Code: 27335 Job: WORKOVER gni WCERLevel: Daily Report Date: 412212019 Report #: 6 Page: 1 of 2 Well Header Permttconcessien N' Operator ubslClary Initial La as Code ADL -388583 ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL Rotary Table Elevation (MGfound Level ml First Plunge to, ftKB- ease Flange in) RKB-Tubing Spool(R) 53 S] 32,805.12 16.82 36.85 ]190 Rigs Rte Name Comndor Rig Type Rig Num Rig Start DataRig Release Date RIG 15 00YON LAND RIG 0]23 41102019 Daily Information Weather Temperature(°F) Wind Days LTI(days) Days RI tdaysl Poe Clear 86 INE @20 MPH Dol 548.00 105.0 Safety Incidents - Near Miss Data category Type Subtype Severity cause Losttime7 Comment Safety Drills Days Until Next check Type 9Occur Last Date Next Dale (days) Authority Visit 1 42012019 42 2019 5 BOP Pressure Test 1 42012019 42712019 5 Rg Robertson 6 4222019 412312019 1 Safely Meerng 6 4/222019 42312019 1 TT Kick While Tripping Drill 2 4212019 4MW2019 6 TT HOS 0011 1 4/172019 7/1612019 05 TT Spill Dail 1 412L2019 51612019 14 Casings seat Cas.Type OD (in) ID (in) Grade Top(RK9) Bottom(RKB) I TVD BOL tRKBI Run Date CA ING 133/8 12.42 L -BO 00 6469.9 2450.8 ]1412D13 CASING 95/6 8.84 LBO 0.0 12.39D.1 3,509.8 ]11412013 LINER 512 483 L-80 11.502.8 21.130.0 3,594.0 728'2013 Last Cementing Cementing Start Dale: 71152013 SWM: CASING. 12,390.1 tKB Comment: Stg 4 Top tRKES I Top Meas Meth Ban (MB) Can 1 9.72 0 Acoustic Log 12,3BO.D SLB We lines to 3000 psi. Rig pump 100 bbis 10.5 poll MudP4sh ® 5 bpm, 340 psi, drop btm plug and SLB mix and s of ter. Rig pump 230 bola 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and Wal, out wl 10 bibwa displace w1923 bbls of 94 ppg LSND mud Q W bon. 2601820 N. Bumped plug am pressure up to 1320 psi ant hold for 10 min. Floods held. CIP Q 1700 has 2 Job Information Job Phase Planned Start DaW Stan DebtEnd Data P50 Dundee(days) WORKOVER 4/10/20190090 4117201910:00 U.Oo Dally Summary Operations 2411 Forecast Complete MLEfrable splice and Suit @ Its. Intent cap and lest as per program. Continue to RIM with 0-12' 12.641410 TSA Hydtll 583 thread as per lolly -GBR tongue -tum correction using Ne Volant tool. Test ESP cable every 1,000' ant monger 1000 psi. on cap fine. Cordage pumping 10 Sol of 9.8 plot brine into well. 20 Summary POOH IMA68'. V83' -flush ESP assembly @ 303'. Terminate ESP cable/cap line to spooling unit and LAD ESP assembly. ROD umimnmengtlrein makes Irom sheaves in derrick. Change out saver sub an TD V4- 12' IF. MOB Baker Centreli8 and GBR equmment to Dips shed and its firer. MIU Volant toot to cap dwas PJSM- PN 7-W shed d and ESP assembly as par Baker CentralM W 05'. RJU ant string ESP cable and though sheave in derrick and pop to splice. Pump 10 bbis car. of 9.0 poll hand W inch. Note: Lose for last 24 hours = 250 bas, Operation at 011 RIM W1ESP ASSY Time Log Start End Co. Dor Time Time our (m) (m) Phase Opr. I Act. Plan Clear. Causer. OO:OD OS'.00 5OD 500 W.O. L 4 P POOHw#h ESP assemby- 1-104-12"tbg 113,968'-11303'. Pump lO bbis.@r.of9.0 ppg arRre. monitor well Upwl=60k. 05M 05:30 0.50 5.50 WO L 19 P Circulatelflush 4-11T tubing and ESP assembly wily 10 bile. of UP ppg brine Pumping 85 Bpm ® 36 psi. 0530 0690 0.50 6w W.O. L 14 P Continue POOH I/303'- U83ESP assembly. Pump 10 firlscar. 09 ppg brine. moo 10'.00 400 1090 W.O. L 5 P Terminate ESP cable/cap line pull back to spooling unit, UO ESP assembly as per Baker GentraliR reps to pipe shed. Recovered and accounted fm all temps and components as per Baker can raped Wily. SIMOPS. Rumored red ant clamps, GRA Wep, and air stops for the rig Seat,Cultures 10 bbis /hr. of 9.8 ppg brine in well. 1000 10:30 0.50 10.50 W . L 5 P PJSM- RID elapWnl track and 2- drain tom ESP cable sheaves in darner to run temperate. 1030 12:30 200 12.50 Wo, L 5 P Charge out saver sub on lop drive BY TT525 W 4-112 IF for Valantipd. Pump 10 Max Mr, of 9.8 ppg Was in WWI. 12'30 1530 300 15.50 W.O. K 1 P Mob Baker Ci ntrli0 tools antl antipment, ESP clamps, motor leads, Y. cep antl TEC line spools and components to rig Poor for ESP assembly. RAJ GOR Volant muss on top drive and torque Sum compuladequymanl Lead pipe shed Win Baker Centraiift 7-$/W shmud, pamplseala/moW a amMl . Conrnue whh l O bWs.lhr. of 9.B ppg brine in well. 15:30 2200'. 6.50 2200 W.O. K t P PJSM for mnnirlg ESP assembly- PIU 7 -518 -shroud and MN ESP pump/seal/mpor assembly, service same es per Baker Centra ift reps. Insist MILE, W oap and V TEC Ilues V85'. Tested TEC line connection 115000 be Mr 5 minutes, witness ENI rep. Check MILE to pump -good battle spike. 22:00 23:30 1.50 23. W W.O. K 1 P Splice rope W ESP cable and pull Mm igh sheave in demck, Rom spooling unit to rig floor. 2330 00 OD 0,50 2400 WO K 5 P Prep MILE end cable ends for mike, apiece with ENI elacbic)an b witness. Nota: Lone Mr lest 24 M1wre= 250 able. Gas Readings Avg Background Gas t%) Max Background Gas 1%) Avg Connection Gas t%) Moa Connection Gas t ) Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%1 Mak Trip Gas (%1 Daily Mud Volumes TanMAdii5on/Loss Type Des Volume (bail ank 861 a Loss 250.0 Hole 1 066 0 Cumulative Mud Volumes Active VOlume(bM) Hole Volume total) Addidons(bbp Cum Additions tab) Losses tLM) coLosses lbbl) 1,967.0 1005.0 00 00 250.0 7160 Daily Contacts Position Contact Name Company Title Email Office Mobile Eni representative simom Sakmmi I Eni Drilling Sup. laxem r".mcom 90]-685-0]15 Well Name: SP36-W5 OR Wellbore Name: SP36-WS Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/22/2019 Report #: 6 Page: 2 of 2 Daily Contacts Real". Contact Name Company Title Email Office Mobile Ent repreaenhhve Davld Smith End Drilling Supv. Eel representative Almsantlm Turbine Eni Fluid Supervisor Eni repreeentdive Were Thomas Eni Rig Clerk AKRIgCkrksDadnlS@enLmm 907,685-0722 Eni representative Mark Harper EN HSE Enl repreeentated Cory Houghton Eni HSE Dolling Supl Sam Dye Doyon Wiling Field Superintendent Tool Push Justin Hays Doyon Drilling Tool Pusher dg15ittdoyandolifir,e m Tod Push El. Fkagle Daps Drilling Tool Push Tool Push CIiXOwens Geyer Drilling HSE convensill000ndrifling cam 6854)796 Tod Push Send Simmons Doyon Coding HSE Personnel Log (P( B) Company Sam. Type Work H (hr) stand-by H Ino Count Nate TGMFU-rim ECD 12.50 0 DNling ASRC Company Man 1250 1 During ASRC ChM 12.50 1 Oiling ASRC SOA 12.50 1 SID Support ASRC Cone Amliaor 12.50 1 SID Support Beason more 12.50 1 SID Support Doyon Flak Superintendent 12.50 1 Dolling Eni Company Man 12.50 1 Drilling Northam Odlfoild Services Fueler 12.50 1 SID Support Vdm(BHGE) Wettlead 12.50 1 Call" Eni Fluids Supervisor 12.50 1 Wiling ACS Envkmnenwi 12.50 2 SIDSuppori Beacon HSE 12.50 2 SID Support Doyon Taal pushers 12.50 2 Gaining Doyon NSE 12.50 2 Wriling Hailiburlon Mud Loggers 12.60 2 Grain, MI Shrew MW Ergineer, 12.50 2 Drilling SLB Cement 12.50 2 Dolling GBR Casing Casing Service 12.50 3 Galling Competenhe Logili c 12.50 4 SID Supi oa Baker CeMNIdX Compleaons 12.50 5 Dmlmg MI Swam Mud Plant 12.50 S Drilling Purcell Security12.50 6 SID Support Ml Swam WIF 12.50 8 SIDSuppon ESS Catering 12.50 10 SID SuppOn Jacobs Tmck driver l Crane operator 12.50 14 Drilling Doyon Rig Personnel 12.50 25 Dnll'mg Total Drilling Personnel 74 BOP Stack 8 Components Description dart Doh Last Codification Date Pressure Rating(psi) Type Make Model ID Nom iii P Range (psi) Last Cert Data Slow Circulation Rates Pump Number: Make: Model: sun Data End Vale Line, $i.(in) Volume Per Stroke Override tbbllsh) Max Pressure (psi) Data I Depth (XKBI Slow Sptl Stmkes(a m) PlpsO EXi%) 1 0Ft. igpm) Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gal Unit Size:1 Note: Dafe Consumed Receivetl Retufned Cum Oonsumetl Cum Recelvetl Cum Returned Co. On Loc Nole 4122/2019 1,2120 1,212.0 ].249.0 ].2490 0.0 0.0 Supply It.. Description: Mud Plod edkrs Unit label: Gal Unit Size: Note: one COnsumetl Receivetl Returned Gum Lomume0 Lum Recelvetl Cum Relurnetl Cum On Loc Note 4P 019 430 42.0 2520 252.0 00 00 Supply Mem Description: Rig Fuel Link Label: gal us Unit Size: 1 Note: DahConsoared Received Returned Cum Consumed Cum Received Lum Returned Lum On Loc Note 4=0192,0980 00 103590 16.950.0 00 6.601.0 Supply lhm Descriptlolr: Rig Water Udt Label: bbl Unitsiae:1 Hopi: Dew Consumed Received Returned [cam Consumed Cum Received Cum Returned cum On Lac Note 41222019 28.0 80.0 208.0 350.0 00 142.0 Supply Item Description: WIF Boilers UnItLabek Gal Unit St. Note: Dah Oonsumetl Receivetl Rewrnetl Cum Consumed Cum Received Cum Returned Cum On Lac Now .019 198.0 198.0 1.188.0 1,188.0 0.0 0.0 Supply item Description: WIF injected Wpesd Udt Lard: Gal Unit Sial, : Now: Gale Consumed Received Reamed Cum Consumed OUm Receivetl Cum Returned Cum On LOC Note, 4122/2019 420.0 4200 3,]800 3,7800 0.0 0.0 Last Authority Visit Dale Tot map. Nor Tata) I.N C. number Comment 412012019 AOOGC JeX Jones Witnessed ROPE Test 420119 STOP Cards Submitted Company IsRpw Com Doyon Gal, 16 PJ M'S Doyen Wism, Inc. 18 Safe Cama DoyonW INng Inc. 16 COW Doyon Wtllkng Inc. 16 HRWS Ml Swam 8 RIR's Ml Swam 6 HARCIJSA General Notes Comment: Well Name:S OR Wellbore Name: e: SP SP36-W-WS Well Code: 27335 Job: WORKOVER ani WCERLevel: Daily Report Date: 4/23/2019 Report #: 7 Page: 1 of 2 Well eader PermlVConceaden N° pe bur Subaldiary Initial Lahas Code ADL -388583 ON, PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL Rmary Table Elevation (N Ground Level (R) First Flange In) RKB -Base Flange (k) RKB-Tubing Spool (Rt 5367 32.805.12 16.82 36.85 31.94 Rigs Rlg Name Contractor Rig Type Rig Num Rig Start Date Rig Release Date RIG 15 DOVON I LAND RIG 0723 u1020t9 Daily Information Weather Temperature (°F) Wind Ory' LTI (days) Day. RI (days) POB 1 Cloudy 150 NE @ 23 MPH 54900 549.00 108.0 Safety Incidents - Near Miss Data Category Type Subtype Severity Cause Lost fume? Comment Safety Drills oays until Next check Type NOccur Last Date Next Date (days) Authority Visit 1 4/20/2019 4272019 4 BOP Pressure Test 1 4202019 427/2019 4 Rq Inspection 7 42112019 4242019 1 Salary Meeting 7 4/232019 424/2019 1 TT Kick While Tripping Drill 2 42112019 4282019 5 TT WE DriII 3 4232019 722/2019 90 TT Spill Drill 1 412212019 5R2o19 13 Casings seat Gas. Type Do (in) 10 (in) Grace Top (MB) Bottom (RK3) I TVD Bot RKB) Run Data CASING 133/8 12.42 LL80 0.0 3,489.5 23,504.8 ,450.6 7/412013 CASING 9518 884 : 0.0 12,390.1 i/1 N2013 LINER 512 483 L40 Mg028 21,130.0 3,594.4 7252013 Last Cementing C .... tay Etartoate: 711512013 String: CASING. 12.990.1KK8 Comment: atg If Top (What Top Meas MeM Bpn (ttKB) Com 1 9 ]23.0[meVlc Lag 12,390.0 SLB teal Ilnes l0 3000 psi. Rg W cop 100Ib1s 10.5 ppg MUtlPush ®5 bpm, 340 psi, drop band plug and SLB mix and pump 230 bms 12S ppg DeepCree cement Q 4.8 ppg, 550 poi, drop tap plug and kickout w/ 10 hula of water. Rig displace .1923 DDH of 94 pplt LEND mud @ M3 bpm, 26W l psi. Bumped plug and pressure up to 1320 psi add hold her 10 min. Floats held. CIP ®17M Inds, 2 Job Information Job Pbase Planned Sort Date Suit Date End Dae PSO OurNb. fit".) WORKOVER 4110201900:00 4/17201910:00 6.00 Daily Summary operations 26b Forecast RIH with 4.1Z 12AN L-80 4-12' Hydnl Wedge 583 thread (/5,012- tR,390'. GBR torque -Wm connection with Vnlem tool. Test ESP cable every 1,000'and monitor 1000 an. on can line. Pump hag volume every 3,000and 10 bbls.lr. Change ESP spools around 7,400` and perform slim. Continue to 9,380' PIU halt hangerdanding joint, doss and spike ESP less. 241h Summary Completed MLE/cap line aplica and rating. RIH will ESP assembly an 4-12' Hydn1 Wedge 563 tbg. GOR terms form conn tion 1/85'- 95,012' -teat ESP cablelmomtar cap line every 1.000'. Pump hag volume every 3.00)' will 9.8 ppg brine, also pump 10 bbls.mr. of 9.8 ppg brine to well. Note: Lose for last 24 house = 283 bbls. Operation at 07.00 RIH W/ESP ASSY Time Log Star[ End Cum our Time Time our em) Mr) phase Opt. Act. Man Oper. Dinner. 0000 03:00 300 3W W.O. K 5 P Completed MILE antl ESP cable spllm an ng floor as per Baker Complaft Perform elecbiml tat and recorded data spmling unit- all good, all witness by ENI elececian. 0300 05.30 2 50 5 50 W.O. K 5 P Pull cop line lrpugM1 sM1eave in tlarnck and optica %" ta JIB`. Perform pressure teal- low 250 psi, 1000 psi: and 2000 poi: all recorded with Data Logger on 1 second intervals for ♦10.Mutes -all goad, on leaks. Bleed pressure to 1000 psi. and stabilized for monitoring while RIH, Change Dae Logger to 2 minute Intervals. 0530 17.30 1200. 17.50 W.O. K 4 P RIHwhh ESP ..piston assembly PlU 4-12112.M/L.80 I Hind) Wetlge 563 hag.IRS'-9$028'. With GBRVolanitool and partiatum commum a. Perform se micel and data est ch ESP cable every 1,000' and moetor regularly line @ 1000 psi. IslaWd me coupling case clamps on every joint while RIH. Up vol=Hak1 Dn M= 94k. Pump via 9b tank 10 bbls.lhr. of 9.8 ppg brine. 1730 18.30 1.00 18.50 W.O. P Test ESP case and check cop line pressure. Ciutale ibg volume wild final pump rete 56 gpnd Lly 170 put, Baker Cenhatift Invited a M gpm. lav) 00'.00 5 50 2400 W., K 4 P Continue RM with ESP cempietlon reprinter, PIU 4-121 126# I L -80I Hydro Wedge 563 Big. (13,028'- 95.012. GBR torque name mrsu cbon with Volas tool. Baker Cenbali8 perform ESP case electrical rest and recoil data every 1.000'. Monflor W" Data Logger and maintain cap line ®1000 poi. Initial ESP cable clamps on ever connection. Up can=1031, / Do wt= 90k. Cbcuete lig volume esry 3,000', nerd @ N- 6,000'. SIMOPS' Spot ESP a vial by ung to prep fm up.mang Mange -oro of reels Note: Lose for last 24 flours m 283 bbls. Gas Readings Avg Background Gas I%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Ga I%) Avg Drill Gas (%) Mas Drill Gas (%) Avg This Gas rh) Max Trip Gat (%) Daily Mud Volumes TanWAdditeNLoas Type Da Volume (pull Tank 877.0 Loss 283.0 Hotta 1.01{4.0 Cumulative Mud Volumes Active Volume (bbl) Note Volume (bbl) Additions (bbl)Gum Additions (bbl) Lona (bat Cum Losses (bbU 1,941.0 1064.0 00 00 283.0 999.0 Daily Contacts Position Contac[Name Company Title Broad Office Mobile En repreaentagve Elmem Belemml Eni Drilling Supv. sedmlingssenLcom 9........ 75 8 5071 5 Eni reposen al Oavitl Smith Ent Drilling Supv. Eni npraentative Mendenhall Tureen Em Fluid Supervisor Well Name: SP36-W5 OR Wellbore Name: SP36-WS Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/23/2019 Report #: 7 Page: 2 of 2 Daily Contacts Position Contact Name Company Title Emall Office Mobile Edi represeMelNe Wade Thomas End Rig CleM AKRigCler"Doynnl5®eni.com 907-6850722 Eni repmsentelrve Mark Hurler Era HSE Enl represedtilNe Cory Houghton Eni HSE Drilling Supt. Sam Dye Doyon Ddkng Field Superintendent Tool Push Justin Heys Doyon Dealing Taal Pusher 6g15Qdoyonddlllrg cpm Tool Push Elim Fle.N. Doyon During Ted Push Tool Push CIO Owen. Doyon 0,011ng HSE cosenceflidirehoinfling.ohn 0050796 Tool Push Scott Simmons Doyon Detling HSE Personnel Log (POB) Company Sam. Type We* H (hr) Sandi H Hit) COUM Note Hellburbn ECD 12.50 0 OrMing ASRC Company Man 12.50 1 DriOing ASRC Clerk 12.50 1 Onlr g ASRC SOA 12.50 1 SIDSupport ASRC Came Adviser 12.60 1 SIDSUpport Beacon Medic 12.50 1 SIDSU,.d Doyon Field Superintendent 1250 1 Drilling EN Company Man 12.50 1 DNlling Norham Oilblld Serves. Feeler 12.50 1 SID Support Vale. eHGE) Wellhead 12.50 1 Drilling Eni Fmgs Supervisor 12.50 1 Dtllling ACS Envsomenlai 12.50 2 SID Support Seaton HSE 12.50 2 SID Support Doyon Tool pushers 12.50 2 grind, Doyon HSE 12.50 2 Entine Halliburton Mud Loggers 12.50 2 Dintung MI Saco Mud Engineer 12.50 2 DtlOmg SLB Camel 12.07 2 Crime Competen8e Legrilic 12.50 4 SIDSupport GER Casing Casing Service 12.60 4 Drilling MI 607.. Mud Plant 12.50 6 Drilling Permit security 12.50 6 SIDSUPport Baker Carmliff Completions12.50 6 Drilling MI Sup. WIF 12.50 0 SID Support ESS Candng 12.50 11 SID Support Jacobs Trucktldver/Crsneoyerater 12.50 14 Entire Doyon Wg Personnel 12.50 25 DdlingJotal Drilling Personnel 74 BOP Stack 8 Components Description Shrt Doh Last Certification Date Pressure Rating (psi) Type Make Model lD Nunn (In) PRange (psi) Last Cert Data Slow Circulation Rates Pump Number: Make: Abdel: Start Data End Date Liner Sin (in) Volume Per Stoke McMtle(bbill Max Pressure (psi) Data Depth (NICE) Slow Spot Strokes issued I P Haiti) Eff (%) D Flow (gam) Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gal Unit Sue: 1 Note: new Consumed Returned Cum Consumed Cum Resident On Loc m Note 151 42312019 0 151]0 8,]60 0.0 0.0 Supply Item Description: Mud Plant Boilers Unit Label: Gal Unit Size: Note: Data Consumed Receivetl Returned Cum Consumetl Cum Received Cum Returned Cum On Lo. ride 412&2019 42 0 42.0 294.0 294.0 0.0 I.0 Supply Item Description: Rig Fuel owl Lsted: gal us Unit Bice: 1 Nate: DohConsumetl Receivetl Rehrated Co. Consumed Cum Receivetl Cum psi umetl Cum On Loc Note 4232019 2,325.0 3,086.0 12.6840 20.046.0 00 7,362➢ Supply learn Description: Rig Water Udt Label: bbl Unit Size:1 Not: Date Consumetl Receivetl Retumetl Cum Consumed Cum Isnolved Cum Returned Cum On Lac Note 42312019 10].0 0.0 3150 350.0 De 350 Supply team Description: WIF also. Udt Label: Gal Unit Size: Note: Doh Consumetl Received Rehrneot Co. Consumetl Cum Received! Cum Returned Cum On Loc Nota 4232018 198.0 1980 1,38fi.0 1,386.0 be 0.0 Supply Item Description: WIF Injected Dina l Unit Label: Gal Unit Size: Nate: Date Consumed Receivetl Returned C Cum Consumed Cum Received Cum Returned Cum On Loc Note 4232019 Do 0.0 3,]800 3,]80.0 0.0 Last Authority Visit Date Td ins, the, Total LN.C. number Comment 42012019 AOGCC Jeff Janes witnessed BOPE Test 4120119 STOP Cards Submitted Co."" p Rpts Com Doyon Drilling 3 PJSM'S Doyon Drilling Inc. 3 COW Doycd Drilling Inc. 3 HRWS Doyon Drilling Inc. 7 Safe Cards Ml Sane 5 HARCIJSA MI Swaco 8 RIR'. General Notes Cmnmenr. Well Name: SPR Wellbore Name:: SP36- SP36-WS Well Code: 27335 Job: WORKOVER ani WCER Level: Daily Report Date: 412 412 01 9 Report k: 6 Page: 1 of 2 Well Header Farm Correlation N" Operator Subsidiary Initial Lanes Code AOL -388503 ENIPETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL Rotary Table Houston in) Ground Level(N) First Flange (it) RKB - Base Flange IK) RKB Tubing Spool(R) 53 61 13.09 16.02 36.85 31.94 Rigs Rig Neme Contractor RIg Type RI9 Num Rig Brad Data Rig Release Date RIG 15 DOYON tAND RIG m23 4/102018 Daily Information WeatherTemProtons PF) Wind Days LTl(daye) Days Rl(days) FOR Clear 8.6 NE 22 MPH ifivi 55000 1060 Safety Incidents - Near Miss Date category Type Subtype Severity Cause Losttimei Comment Safety Drills Days Until Next Check T pe 'Occur Last Date Next Date (days) Authority Viso 1 4120/2019 42712019 3 BOP Pressure Test 1 412012019 42712019 3 Fire unit 1 412442019 5/8/2018 14 Rig lnspediat S 42412019 42512019 1 Safety Managing 8 42b2019 4252019 1 TT Kick While Tripping Ddg 24212019 420/2019 4 TT 142S Drill 3 42312019 ]/22/2019 89 TT Spill will 1 4222019 5/6/2019 12 Casings seat Cas. Type Do (in) ID (in) Grade Top (ftKB) Bottom itlKB) TVD Sot.(hKB) Run Data CASING 13 1,8 12A2 L -BO 0.0 3469.5 24508 ]l4/2013 CASING 95R B.Bd 1,80 0.0 12,390.1 3,504.8 711412017 LINER 512 4.83 L-80 11,5028 21,130.0 3,5944 7252013 Last Cementing Cementing Start Date: 7/1WO13 String: CASING. 12,3gc1ftKB Comment: Sig 9 Top (KKB) I Top Meas Mem Ban DtKB) Cpm 1 9,723 D Acbu.9r Lag 12,390.0 SLB teal Ines ad 3000 Psi, Rig Pump 100 been 10.5 ppg Mudi @ 5 bpm, 340 psi. drop burn plug and SLS mix and pump 230 bible 12.5 ppg Dissociates cement @ 4.0 ppg. 550 psi, drop lop plug and kick but wl 10 blue of water. Rig displace ad 923 bible of 9.4 ppg LSND mud ® 513 bpm, 260/ 820 psi. Bumped plug and pressure up M 1320 psi antl hdtl for 10 min. Floats held CIP 170 him 2 Job Information Jab Phase Planned Start Date Start Data End Dole Pill DuraOon (days) WORKOVER 4110201900:00 411]201910:00 0.00 Daily Summary Operations 20 Forecast Finish penetrator pigtail spkce and dress 169 hanger with splice Y.' capillary -line, perform lead on each. Land mg hanger and perform electrical lest. Test harper body V5000 psi. Pull landing joint and Install BPV- months. WD BOP and WU use. GE Veko perform passport last. 2" Summary RUN ESP completion an 4-12' mg 12.60 / L -80I Hydril Wedge 563 thread (/5,012'- 0,0451 Change ESP spools and perform ESP cable slice I test GBR mmue-tum connection with Voted tool. Test ESP cable every 1.000and Data Lagger monitor capillary line Ig 1000 psi. Pump tbg volume Q 6,000' and 10lebJhr. Generale 0.390' and P4U mg han9edianding joint, GE Vetcn oriented and NO HellibuMn Fast Swivel. Baker CerdralM ESP penetrator pigtail spike with ENI electrician witness. Note: Lose for last 24 hours = 363 tads. Operal en at 07.00 Wp SOME Time Log Stare End Com our Time Time Dur (m) err) Phase Opr. I Act Plan Doer. Descr. 00:00 02'30 250 230 W.O. K 4 P RIH with ESP completion P/U 4-12112. BY 4 L-80 / Ryddl Wedge 563 ibg. f6i65.029'. GBR tbryue turns conte Nsm with Volad tool. Baker Centralifl perform ESP cable electrical fest and record data every 1,000'. Monitor Data Logger on cap line @ 1000 psi. Install ESP cable clamps on every contemnor. On w1,= 821. Pump fit dunfln. of SS ppg brine. 0230 0330 1.00 3.50 W.O K 19 P Test ESP cable all check cap line uppeamen Circulate Ott volume with fmau pump We 75 gpm ® 840 pal. 0330 0630 3.00 6.50 W 0 K 4 P RIH with ESP cample0on PIU 4-12-112.60 / L-00 / Hydnl Waste 563 tbg. WT- W.045. GBR tofqueAum wnmmibm. Preform electoral and tlda test on ESP cable and monitor capillary line @ IM psi. Installed cable clamps on every joint On a4= 82k Trip tank atld 10 bbis.dr, of 9.8 ppg brine. 05:30 11:00 450 11.00 W.0 K 5 P Change out reek In ESP spooling unit per Baker Cardinal, Spike ESP cable to reel In spooling Mul and test ekceical and record down hole data points, wMeas by ENI blecMtlan. SIMOPS: Service top drive, pipe shad and mud pump maintenance, C/O Volanf battery pack as per GBR. 1100 18:00 7.00 18.00 W.0 K 4 P Continue RIh with ESP compkfion PN Fll /t LLS; / LACI NOW Wedge 583 Re. V7.045' -V9,390'. GBR toque him connection. Baker Centralia perform ESP cable electrical test and recall data every 1,000'. Monitor capiiery lith with Date Logger @ 1000 psi. Install ESP cable clamps on ever comlec0ot. Do cal.= 721,. 1800 19.00 To 1900. W.0 K 5 P FVD GBR bail exlamamps and Volant and install 4.11 mg elevators - MOB ting hanger and Hagiibudon FAST -Swivel to re floor. 1900'. 20 OD 1.00 2000. W . K 5 P WU Rover Halliburton FASTSwiml. Wit lending joint and MN b tbg hanger. GE Vetrn'dented and MN to spec: final gap 0.462 mm TO -0i 00,001-400 24.00 W.O. K 5 P Baker Centrallh making final penetrator Pgtag assembly splicefor" hanger. witness by ENIetendan. Prearced Post 4 on caplllery Ilne with 1000 pan record one second Interval. for 10 mins. Note: Lose for lest 24 hours =363 Max. Gas Readings Avg Background Gas (%) Max Background Gas (%I Avg Connection Gas I%) Mak Connection Gas (%) Avg Drill Gas (vd Max pill Gas (%I Avg Trip Gas (%) Max Trip Gas (%) Daily Mud Volumes TanWAtlamonlLoss Type Des Volume Rf ark 2 0 Loss 363.0 Hole 1,045.0 Cumulative Mud Volumes Acfive Volume (bellHole Volume (bbl) Additions (blah Cum Additions (bbl) Losses (bbl) Cum Losses (bbh 1,248.0 10450 0.0 0.0 363.0 1,302.0 Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/242019 Report #: 6 Page: 2 of 2 Daily Contacts Position Contact Name Company Title Email Chet. Mobile EM representative Simone Sell Eni Drilling So, sidddlling@eni.com 8 0 741850715 Enirepnrmt.11N. Could Smith Ent Duling Supe. Eniu numali Watle Thames EN RIB Clerk AKRIgCkrIbDU mnl5@sni.cam 950605-0722 Eel repmeardetive Mak Hublar Epi HSE Eng zepoaerlative Cory Houghton Eni HSE Drilling Supt Sam Dye Doyon Drilling Heid Su mark. fart Tool Push Justin Hap Doyon Dr01hp Tool Pusher rgl5@d Wnddiling.com Tool Push Einer Fmegm Doyon DMiing Tool Push Tool Push CIICvoom Dayan DnRng HSE cowens@dopnddlling.com 885-0796 Tod Push Dev. Sena Doyon Drilling HSE dsena@dopondrilling.com 605-0796 Personnel Log (POB) Company Sam. Type Work H(hr) Stand-byH an Court Note Hell orlon 1250 IIinD Eni Field. Supervisor 12.50 0 Drilling ASRC Company We 12.50 1 Drilling ASRC Clek 12.50 1 Dnlling ASRC SOA 12.50 1 SID Support ASRC Cone Adviser 12.50 1 SID Support Beacon Medic 1250 1 SID Support Doyon FMtl Superintendent 12.50 1 Drilling Eli Company Man 12.50 1 Dulling Noribem Oipelld Servtes Poster 12.50 1 SID Support SLB Cement 12.50 1 ranging Veto(BHGE) W.IlHead 12.50 1 Drilling ACS Envimmental 12.50 2 SID Support Beacon HSE 12.50 2 SID Support Doyon Tod pushers 12.50 2 Running Doyon NSE 12.50 2 During Halliburton Mud Logger: 125D 2 Drilling MI Ssu co Mud Engineer 12.50 2 Drilling COcquouta Logistt 12.50 4 SID Supood GBR Casing Corning Sarviw 12.50 4 piiMg Mi Swaw Mud Plant 1250 6 Drilling Purcell security 12.50 6 SID Support Baker Cei Completions 12.50 6 Dulling Ml $warn WIF 12.50 8 SID Support ESS Catering 12.50 11 SID Supporl Jacobs Truck driver /Cane operator 12.50 14 Drilling Doyen Rip Personnel 12 1 25 DnIIIn9Jotal Drilling Personnel 74 BOP Stack R Components Description 8Yd Wte Last C.dit .tion Data Pressure Rating has!) Type Make Model ID Nom (in) PRange (psi) Last Ced Dole Slow Circulation Rates Pump Number: Make: Modelo start Date End Data Liner Size (in) Volume Per Stroke overdue bbllak) Mas Pleasure (,a!) Date Depth(WEI) Slow Spit Strokec(spm) P(par) Ee(%) OFlow (gpml Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gal Unit Size: 1 Note: Doh lConsumed I Received Rate ... d Cum Consumetl Cum Received Lum Returned CUm On Lon Note 424/2018 1,048.0 1048.0 9,814.0 9.814.0 CU 0.0 Supply Item Dosc - Mutl PleM eolmM Unit Label: Gal Unit Size: Note: Date Consumetl Received N! Returnetl Cum Consumed Lu -.Ross - Cum Returned Com On Loc Note ,ug 4IZ19 42.0 420 336.D 60 0.0 Supply Rem Description: Rig Fuel Unit Label: gal us Unit Size: 1 Note: Date Consumetl Readved Remrrad Cum Consumed Cum Received Cum Returned Cum Oa Loc Note 42412019 22990 0.0 14,983.0 20,046.0 0.0 5.063.0 Supply Item Description: Rig Water UnRLebel: bbl Unit Size:1 Note: Rafe ConsumedRaceivetl Returned Cum Consumed Oum Received Cum Returned Cum On Lou Note 4242019 210 0.0 3360 350,0 0.0 14.0 Supply Item Description: WIF Boilers Unit Label: Gat Unit Size: Note: C on. Date CsumedIn Received RNurned Cum Consumetl Cum R.ceived Lum Returned Cum On Loc Note 4242018 1980 t504.0 1,584.0 0.0 0.0 Suoply Ram Description: WIFladed Dleld Unit Labol: Gal Unit Size: No. DantConsumetl Received Returned Lum Consumed Cum Received Cum Returned Cum On Loc Note 42412019 4200 4200 4,200.0 4,200.0 0.0 0.0 Last Authority Visit Date Tot hop. Nor Total I.N.C. number Comment 4202o18 gOGCC JeR Jones wban ed ROPE Test 420/18 STOP Cards Submitted Company 0 Ross Cam Wynn Dinfifing 11 PJSM Doyon Drum, Inc. 42 Sale Cards Doyon Drilling into 11 COW Doyon Drilling into 11 HRWS Ml Sis. 8 RIR's Ml Swaco 7 HARCOSA General Notes comment: Well Name:5 OR Wellbore Name: e: SP SP36-W-W5 Well Code: 27335 enie' Job: WORKOVER WCERLevel: Daily Report Date: 4/25/2019 Report #: 9 Page: 1 of 3 Well Header PermitlConcession N° Operator Subaldiary Initial Lames Ootle AOL -388583 ENI PETROLEUM ENI Petroleum Go. Inc. DEVELOPMENT WELL Rotary Table Elevation jr, Ground Level DoFirst Flange(,) RKD - Base Flange HO KKB Tubing Spool(a) 5367 13.119 16.82 36.85 31.94 Rigs RigName Conbacfm Rig Type Rig Num RIg SMrt De@ Rig Release Date RIG 15 DOYON LAND RIG 0]23 4/tO2019 Daily Information Weather Wina Days LTI(days) Days IS POB Overcast r14.. 14.0 EQIO MPH 551.00 55100 980 Safety Incidents - Near Miss Data Category Type Subtype Severity Cause Lost time? Comment Safety Drills Days Until Next Check Type 0Occur Last Date Next Date (days) Authority Mak 1 42012019 412712019 2 BOP Pressure Test 1 42012019 4127/2019 2 Fire drill 1 4/2472019 W12019 13 Rig lnspsctlon 9 412WO19 42612019 1 Safety Moetin9 9 41252019 42612019 1 TT Kick While Topping Drill 341252019 !r22019 7 TT H2S 0.11 3 42312019 7222019 88 TT Spill Doll 2 4252019 5192019 14 Casings seat Cas.Type GO (in) to (in) Grade Top RKB) I am". (me) I TVD But (faKB) Run Data O aimri 133/8 12A2 L-60 0.0 3.469.5 2,450.8 ]142013 CASING 9518 8.84 L80 00 12.390.1 3.509.8 ]1142013 LINER 5 112 4.83 L-80 11.5028 21,130.0 3,594.4 72672013 Last Cementing Corning., Start Dale: 771512013 String: CASING. 12.390.1gKB Comment: Soo Top IaKB) Top Meas Mem I Ban(RKB) I Co. t 9.]23 0 ACoudk Lag 12.390.0 SLB last lines to 3000 Par. Rig pump 10 bbN 10.5 ppg Madftsh @ 5 bpm, NO psi, drop ban plug and SLB mix and pump 230 bola 12.5 ppg Dissociate cement @ 4.8 ppg, 550 psi, drop top plug and kick out wl 10 bola of water. Rig displace w/ 923 bale of 94 pp, LEND mud @ W bpm, 26M 820 psi. Bumped plug and pressure up to 1320 psi and I hod by 10 min. Firsts Mid CIP @ 1700 bra. 2 Job Information Job Phase Planned Start Date Start Data End Data PSD Duration (days) WORKONER 4110201900.00 4/17201910:00 OOO Daily Summary Operations 24h Forecast SP35AV5 workover complete. Rig mow horn SP36-W5 or SP12-SE3. 24h Summary Finish penetrator pigtail splice and area mg harper with splice Y°' capillary line, peoora test an each. Land thg hanger and sclec in lock down pins, perform electrical lest. Teat hangar body V5000 Psr. Pull landag joint and install BW-montlw. WD BOP and WU tree_ GE Ve" perform passpod teal. We Lose for last 36 he.. = 363 bbl i. Operation at 07.00 Rig all operations to SP12SE3 Time Log Stare End Cu. Dur Time Time Car(hn I @q Phase Orr. Act. Plan Oper. actor. 00.00 0100 1.00 1.00 W.O. K 5 P Baker Centralift finishedfrol penetrator pigtail spinaefor tbg hanger and conduct etmoreal test, wiliness by ENI hauctocian. Add 10 bblsJhr. 0100 0200 100 200 W . K 5 P Space oW arm hicall 1W capol line through themg harperper. GEVeer. test hanger capillary void t. S"Ing far 10 mins. Wrap %' hose mass mg and spike to 316'. Add 10 bb6 mr. 02:00 0330 1.50 350 V0_ K 12 P Pedonn capillary integray tart. recorded with Data Logger on one second intervals for IO - mina. @250,i and 1000 poi. Increasing pressure to burst disk @ 4033 psi, and continue pumping Hof 5 minutes to confian Inledlon ICP ® 19M psi. antl FOP ® 19M parshuNa and member for 10 manages pressure slebiilaed @ 1876 psi. Pwg in umbikmrd to Perri and perform electrical lest - good 03.30 05:00 150 500 WO. C 5 P Land ESP complegon lntowell head (Upwt=14M.On all 75k)- lorJ: tlown pine and pmmmMdcomplete ESP ager bnding - gad, w9mas by ENI rep. Teat hanger body void V5000 pat far 10 minutes per GE Vatco, winners by COL. dollar. 5,00 06:30 1.50 5M Wo C 5 P and UD belling joint and installed SW Into Ibg hanger - shelter or 30 minutes. WU fill -up lane to Annulus B to maintain 10 blas As. white NT. SIMOPS: Clear non-essential equipment and clean ng floor. 06:30 12CD 5 s0 MOO W O. C 5 P7_ NAD BOP- remove IMckell nipple - remove accumulator, cboka and kill lines-chokepkill NCR antl manual ver es -PIUand rack back BOP stack - Pull HP dset rack back tin cellae SIMCPS: Prep to move dg 1200 137 100 13.M W.O. C 5 P NVU Ins - Pmp tog hanger and run capillary through bee par Viden, rep. Set and torque ray -lock to spec. 13:00 1430 1.50 14.50 W 0. C 5 P Test hanger void and neck seal V5000 par tar 10 mases per GE Vetco. witness by ENI company rep. Pull BPV and Install TWO RU to test. 1430 17:m 250 1700 WO. C 12 P Attempt to areal test, Iumcater out TWO and repbam with new TWO. SIMOPS'. ROD and move accumulator, WD lines m#3 mud pump, dean pile, and cock washer for dg move 17:00 2300 600 23.00 Wo C 12 P 1SWournpasspod teal an tonal Par Gil Vefti2 30 psi, grease and firmetronolives and SSV.Go last. SIM PS: Remove .it ..an. and #3 mud pump, pus seMce loop hmn tap done and denkk Prep b odd rg floor. 2300 00:00 100 24.00 NTO C 5 P Rempw TWO w wbr.bdcat,To same and was has valve- secure well Workover completed Note. Lme for last 24 hours =208 ods. Note: ProducMn -bleed down all monitor EP125E3-tbg? 244 psi. l Am.dus 8=150 Psi. /Annulus A= 268 psi. Gas Readings Avg Background Gas I%) Max Background Gas I%) Avg Connection Gas I%) Max Connection Gas CA) Avg Drill Gas (°hl Max oral Ga (%I Avg Trip Ga. I%1 Max Trip Gas I%) Daily Mud Volumes Tonl0tltlm tivall.3 Type Des V.I.(bbg Tank 0 Loss 208p Hole 1,045.0 Well Name: SP36-WS OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/25/2019 Report #: 9 Page: 2 of 3 Cumulative Mud Volumes Active yet...(bbq HONv0lmna(bbll AddlOans(bb0 Cum Additions(6b0 Losses (bbl) Cum LOases(bM) 1.0450 1.Ws.0 0.0 0.0 2080 1.570.0 Daily Contacts Position Conssct Name Company Title Email oelce Middle Ent repremmeave Simone 8efirrom Ent Unhand; Sup¢ eadnlliigleni. m 90]-685-0]15 Ent representative grace Simonson Ent Drilling Supv. audddlling@,mcom 90],68&0)15 Ens repreaentatNe David Smith Ent Drahng Supv. Ent representative Wed. Thomas Ent Rig Clerk AKRsgClerksDdyon l5®eni.com 907465-0722 Enl rep .... nations Me& Hubler Ent HSE Ent haresenhlbe Pet Mem Ent HSE Will, Supt. Sam Dye Dayton Oak, Reid Superintendent Taal Push Rye. Pankrah Doyon Drilling Taal Pusher ngl5iltdoyonddlling,win Tool Push Einer Handle Doyon DHIUng Toal Push Tod Push Carlosm Doyon DMBng HSE covens@dayorionOing.com 885-0798 Tool Push Dave Sena Doyon Drilling 715E dsenatiltdoymmnlling.mm 885-0796 Personnel Log B) Company Sere. Type Work H(hr Stand-by H(hr) Count NMB Haliburon ECD 1250 0 Calling SLB Cement 1250 0 Drilling Ent Rad. Supervisor 12.50 0 Drilling GBR Casing Cash, serves 12.50 0 Drilling ASRC Company Man 12.50 1 Drilling ASRC Clan: 12.50 1 Drilling ASRC SOA 12.50 1 SID Support ASRC Crane Advisor 12.50 1 SID Support Beason Modic 12.50 1 SID Support Doyon Haiti Superintended 12.50 1 Drilling Ent company Man 12.50 1 Drilling NeMer. Oilleild Services Favor 12.50 1 SID Supyor Vemot(BHGE) WsIIHead 12.50 1 Drilling ACS Extramarital 12.50 2 SID Support Beacon WE 12.50 2 SID Support Doyon Tool pushers 12.50 2 Drilling Dayan HSE 12.50 2 Drilling Helliburzat Mud Loggers 12.50 2 Drilling Ml shared Mud Engineer 12.50 2 Drilling CompMened Legible 12.50 4 SID Support Baker CenWllR Completions 12.50 4 Drilling MI Save. Mud Plant12.50 6 Dulling Purcell SewMy 12.506 SID Support Ml S.. WIF 12.50 8 SID Support ESS Catanng 12.50 10 SID Support Jacobs Truck diner/Crane operator 12.50 14 Drilling Doyon Rtg Personnel 1250 25 Dtlllmg_Totel Drilling Personnel BOP Stack 6 Components Description Shit Data Last !!= more Pressure Rann9 (pal) Type Make Molal 10 Nom (in) P Range (pail Last Can Date Slow Circulation Rates Pump Number: Make: Modid: Start Data I End Date Liner Size put volume Per Stroke Override (bbi/sti) I Max Pressure (pal) Cate I Depth NKB) Slow Sad Stiokes(apml P(Psll BY I%) QRate (giblet Daily Bulk Supply Item Description: Equipment Fund Unit Label: Gal Unit Son:1 Note: Data Consumed Recetvetl Returnetl Cum Consumed Cum Received Cum Returned Com On Loc Note 4252019 1.2690 1269.0 11,083.0 110830 I 0.0 I Supply OeserPa...Mud Plant Boilers Uen Label: Gal Unit Size: Note: ad Cate Consumed Received Returnetl Cum Consumetl Cum Racalved um Returned Cum On Loc Note 4252018 42.0 42.0 378.0 378.0 0.0 0.0 Supply Item Desorption: We Fuel Unit Label: gal us Unit Size: 1 Note: Date Consumetl Reuivetl Returned Cum Consumed tum Received Cu. Returnetl Cum On Loc Note 42512019 2,061.0 3.852.0 1],044.0 23,9,8.0 0.0 8.864.0 Supply lam DtlMpti9n: Rig Water Unit Label: led Unit Size: t Note: Dab Loneumad Resolved Returned Cu. Consumed Cum Received Cum Returned Cum On Loc Note 42512019 490 500 3850 400.0 0.0 15.0 Supply have generation: WIF Bogah UMILdial: Gal Unit Sea Note: Cate Consumetl Receivetl Returned Cum Consumed Cum Received Cum Returned Cum On Loc Note 0/2Y1019 198.0 1980 1,182.0 1,782.0 ,a 0.0 Supptylten Deeeription: WIF lnlecied Diesel UNtlabN: Gel Unit Size: Note: Date Consumed Receivetl Returned Cum Consumed CUm Receivetl Cum Returned Cu. On Lae Note 4125!1019 4200 4200 I 4,620.0 4,620.0 I 0,0 0.0 I LaSt Authority Visit Dace Tot ins, Nbr Total I.N.C. number Comment 4202018 AOGCC Jeff Jaren wllneaeed BOPS Test 4120119 ST P Cards Submitted Company #Russ Lam Doyon Dolling 1 J M' Doyon Drilling Inc. 19 HRWS Doyon Drilling Inc. 19 cow Dayan Drilling Inc. 13 Sale Cards Ml Swaco a IBARC/JSA Ml Swaco 8 RIRs Well Name: SP36-W5 OR Wellbore Name: SP36-W5 Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 412512019 Report #: 9 Page: 3 of 3 Well Name: SP36-W5 OR Wellbore Name: SP36-WS Well Code: 27335 Job: WORKOVER WCER Level: Daily Report Date: 4/17/2019 Report III: 1 Page: 2 of 2 Personnel Log (POB) Company Serv. Type Work H(m) Strri H Nu) Count Nola FCS Enviramental 12.50 2 SID Support Beacon HSE 12.50 2 SID Support Wynn Tool "share 12.50 2 During Doyon HSE 12.50 2 Drilling Halliburton Mud Loggers 12.50 2 Drilling Halliburton ECD 12.50 2 Dnllmg MI Swem Mud Ergs. 12.50 2 Dnllteg SLB Cement 12.50 2 Drilling Conn'tenge Logone 12.50 4 SID Support MI Swam Mud Plant 12.50 6 Drilling Purcell Security12.50 6 SID Support W SWaco WIF 12.50 8 SID Suppert ESS teri Cang 12.50 10 SID Support Jacobs Truck driver I Crane operator 12.50 14 Drilling Wynn Rig Pereomel 12 W 26 Drilling Total Drilling Personnel 67 BOP Stack 8 Components Description Start Cote Last CertlBcatlun Data Pressure Rating (psi) Type Make Moral ID Nom (I.) PRange (psi) feel Gert Dale Slow Circulation Rates Pump Number: Make: Model: StartCola End DMe Liner Size (int Volume Per Stroke Override (bbl/sur) Max Pressure (psi) Date Deptb /rice) Slow Spot Strokes(spm) Plpsll EN I%) F OFlow (gpm) Daily Bulk Supply Item Description: Equipment Fuel Unit Label: Gal Unit Size:l No. Dale Consumed Received Returned Cum Consumed Cum Received Cum Retumed Cum On Loc Note 4/17Y019 1,243.0 1,243.0 1,2430 1,2430 O.0 0.0 Supply Item Description: Men Plant Boilers Unit Label: Gal Unit Size: Note: DateConsumetl Received Returned Cum Consumed Cum Reconvert Cum Returned Cum On Loc Note 4/1]2019 42.0 42.0 42.0 420 00 00 Bu IMn Description: Rig Fuel Unit Label: gal us Unit Size: 1 Note: Gate Consumed Receivetl Returned Cum Consumetl Cum Received Cum Returned Cum On Loc Note 4n]2018 1.388.0 10.986.0 1.388.0 10,986.0 0.0 9,598.0 Supply IMn Description: Rig Water Unit Label: bbl Unit Size: 1 Note: Dale Consumed Received Returned Cum Consumed Cum Receivetl Cum Returned Cum On Loc Note 4/1]/2019 0.0 00 0.0 0.It 0.0 0.0 Supply Nam Description: WIF Boilers Una Label: Gal unit Size: Note: Data Consumed Recelved Returned Lum Consumed Cum Receivetl Cum Returned Cum On Loc Note 4/1T/2019 196.0 1980 1960 198.0 0.0 0C Supply Item Description: WIF Injected Daniel UMt Label: Gal Unit Size: Note: DateLOOSUmad Receivetl Returned Co. Consumed Cum Received Cum Returned Co. On Loc Nate 41171W19 420.0 420.0 420.0 420.0 0.0 0.0 Last Authority Visit Date Tot map. NM Total I.N.C. number Comment STOP Cards Submitted Company #Burs Com Cayce Dnikng 4 PJSM'S Doyon Dnlxng Inc. 4 CAW Doyon Drilling Inc. 5 Safe Cams Wynn Dulling Inc. 4 HIRING MI Swaco 6 HFRC/JSF MI Swaco 8 RIR. General Notes Comment: THE STATE ALASKA GOVERNOR MIKE DUNLEAVY Stefano Pierfelici Well Operations Project Manager Eni US Operating Co. Inc. 3800 Centerpoint Drive, Suite 300 Anchorage, AK 99503 Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP36-W5 Permit to Drill Number: 213-082 Sundry Number: 319-172 Dear Mr. Pierfelici: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 v .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, �G�,71CIiel'owski -e, Jessi Commissioner DATED this a day of April, 2019. RBDMSLLEYAPR 0 9 2919 S;, Q"r-V7-S4lglxx STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 APR 0 3 20119 4()rrr. 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Q • Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: _ESP Change-out—E] 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Eni US Operating Co. Inc. Exploratory ❑ Development Q , Stratigraphic ❑ Service ❑ 213-082 ' 3. Address: 6. API Number: 3800 Centerpoint Drive, Ste, 300, Anchorage, AK 99503 50-629-23492-00-00 ' 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? A Will planned perforations require a spacing exception? Yes ❑ No ❑O SP36-W5 9. Property Designation (Lease Number): 10. Field/Pool(s): 03912831 0388577, 0388574, 0388575 I Nikaitchuq Schrader Bluff Oil Pool it. PRESENT WELL CONDITION SUMMARY Total Depth MD (fl): Total Depth TVD (t): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): • 21813 3386 21130 3596 1055 N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor 160 20" 160 160 Surface 3470 13.375" 3470 2453 5210 2480 Intermediate 12390 9.625" 12390 3507 6890 4790 Production Liner 959715.5" 211301 3596 slotted slotted Perforation Depth MD (ft): Perforation Depth TVD (fl): Tubing Size: Tubing Grade: Tubing M D (fl): 12,390-21,130 3,507-3,596 4.5" L80 9237 Packers and SSSV Type: Packers and SSSV MD (fl) and TVD (fl): WA N/A 12. Attachments: Proposal Summary LwJ Wellbore schematic L�j 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 2 Exploratory ❑ Stratigraphic ❑ Development Service ❑ 14. Estimated Date for 4/9/2019 15. Well Status after proposed work: Commencing Operations: OIL WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stefano Pierfellci Contact Name: Amjad Chaudhry Authorized Title: Well Operations Project pager Contact Email: amiad.chaudh eni.COm Contact Phone: 907-865-3379 Authorized Signature: Date: OJLq cOMMISS N USE ONLY �r that a representative may witness Sundry Number: n 1 11 L Conditions of approval: Notify Commission 310-112- ✓,soo Plug Integrity ❑ BOP Test M Mechanical Integrity TestLocation Clearance Elf �❑ Other: X Sao() �� gPR 0 91019 / Post Initial Injection MIT Req'd? Yes F-1No❑ RBDMS✓ Spacing Exception Required? Yes ❑ No [g Subsequent Form Required: APPROVED BY )41 I / 1 Approved by: COMMISSIONER T E COMMISSION Date: e ! l (,N/ �' `Submit Form ani_ Form 10403 Revised 412017 A 4 roved applicat bn is valid for 12 months from the date of approval. Attachments in Duplicate WEinio Petirdleviinn 3800 Centerpoint Drive Suite 300 Anchorage, Alaska 99503 Stefano Pierfelici Phone(907)865-3320 Email: Stefano.Pierfelici@eni.com April 2"d, 2019 Alaska Oil and Gas Conservation Commission 333 West 7`^ Avenue, Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval for SP36-W5 Rig Workover Dear Commissioners, ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP36-W5. SP36-W5 was completed on Spy Island on August 181, 2013 with a conventional electric submersible pump set at a depth of 9,456' MD. This ESP producer was completed without a packer. The well was started up for production in August 2013. On April 151, 2019 an electrical failure occurred to the ESP failure was occurred and ESP went down. The estimated date for beginning this work is April 9', 2019. Please find attached for the review of the Commission forms 10-403 and supporting documentation. If you have any questions or require further information, please contact Amjad Chaudhry at 907- 865-3379. Sincerely, c Stefano Pierfelici Well Operations Project Manager SP36-W5 Workover — Summary Page PTD#:213-082 Current Status Well SP36-W5 is currently down due an electric ESP failure. Scope of Work Scope of this workover is change ESP pump. General Well info Reservoir Pressure/TVD: This well is expected to have a static max bottom hole pressure of approximately 1,450 psi (3,596' TVD) during the time of workover, which places the fluid level well below surface. Wellhead type/pressure rating: Vetco Gray, MB -247/5000 psi BOP configuration: Annular/pipe/blind rams/pipe TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not performed. Intermediate csg 9 5/8" was tested prior to drill out on July 2013. Well type: Estimated start date: Drilling rig: Completion Engineer: Senior Drilling Engineer Producer April 91h 2019 Doyon 15 Tommaso Mallano Tommaso.Mallano(a)eni.com Work: 907-865-3345 Amjad Chaudhry Amiad.chaudhru(5)eni.com Work: 907-865-3379 Well Operations Project Manager Stefano Pierfelici Stefano.pierfelici(a)eni.com Work: 907-865-3320 Procedure: 1.MIRU Doyon 15. 2. Shear upper GLM valve and pump in bull heading 9.3 ppg NaCl/KCI brine through tree. Pump in bullheading 9.3 ppg NaCl/KCI brine in IA Ensure well is killed. 3. Set BPV. ND tree and NU BOP and test as per AOGCC requirements. 4. Pull tubing to upper GLM. 5. Shear lower GLM valve and pump in bullheading 9.3 ppg NaCl/KCI brine. - 6. Pull tubing to lower GLM. Rig up wireline and pull tubing stop check valve. 7. Circulate out remaining production fluid. 8. Continue POOH and lay down ESP assembly. 9. MU new ESP assembly and RIH to setting depth. 10. Land hanger, and test it. 11. Install BPV and nipple down BOP. 12. NU tubing adapter and tree. 13. Pull BPV, install test plug and test tree. 14. Circulate Freeze protect through tree down IA. 15. Shut in well. 16. RDMO. Below the current schematic of the well: Sur/. Casin 7 Baro^, 63 x \ 470' MD, 2,453 TVD IIV Inc. 11,219' MD, 3026• TVD- L7 -Baker SUP Liner Hangerfloacker Resman Oil/Water T Sub #3 4,%' 12 6 ppf Production Tubing 2.19r MD, 1.887' TVD 53• Inc - GLM, KBMG. 4-%- x 1', with 2.000 psi STS -1 SOV installed 4-%' rcplg cable clamps. for ESP Power Cable, (1) 3i8' Chem Inj Line 9.236' MD, 8r Inc - GLM. KBMG, 4.'/," z 1'. with 3.100 pal STS -1 SOV installed 11,533- MW1 3,457' TVD - Sake' SUP Liner HangeH Packer — Sub #1 9,334' MD, 3.179' TVD - Discharge Gauge Sub SP36-W5 Dual Lateral Producer with ESP Lift As completed 0811612013 9 438' MD. 3,205' ND. 83° Inc - Bottom of Motor Centralizer Centdlift. TTC-ESP. 134 -stage 38OP18SXD pump. 513 GS133 seals. 150 HP MSP325 motor 9.455' MD 320 Shroud Assembly with cable and 5-7.' Silver Bullet Er / chemical injection line feed-Ihrus Slotted Liner, 11,437-11.454' MD, Resman ON HAL SZ' On Swell 5-Z- Silver Bullet Ecc. b Y.^ 15.5 ppf Planned Casing Exit Water Tracer Sub packer Nose Guide Shoewith 20,651' MD, 3,61 Window #2 \ / / / Bent Joint TVD \ 96° Inc. Interm. Casing 9-518", 40# HAL 5-%'011 Swell 12 390'MD, 3,507' TVD Packer 871 Inc, 5-7.' Silver Bullet Er Nose Guide Shoe 1 aUa's.u"riiea a aen ' Slotted Liner, •' - VA" 15.5 ppf sLz-swuirn++. vnn wurw+s 21130' MD, 3,596' TVD o-vz-r..uer.as vssx 95. Inc RIG 15 BOP STACK HYDRIL 13-5/8" ANNULAR "GK" 5000 PSI STUD x FLANGE BX -160 FLOOR ;1{1YDRI�L�; HYDRIL MPL SINGLE GATE 13-5/8" 5000 PSI FLANGE x FLANGE BX -160 10" OPERATORS VARIABLE PIPE RAMS ® OO HYDRIL MPL SINGLE GATE 13-5/8" 5000 PSI FLANGE x STUD BX -1600 0 14" OPERATORS ® ®O BLIND/SHEAR RAMS HYDRIL MPL SINGLE GATE ® ®� 13-5/8" 5000 PSI ®LCCot FLANGE x FLANGE BX -160 10" OPERATORS VARIABLE PIPE RAMS VetcoGray MB -247 SURFACE COMPLETION SYSTEM PRP 10161, NO aGc imacinahcn o. work 10 OF 10 23 JANUARY 2009 • • Com( o 0 it"m co _ co` 0 ,_ O n ,- 0 0 0) O co) Or h O n V a 0 m ' 0 N 0 CO O a m a M N co O 0 n n r €0 n n 0 t0 0) 00 0 j C l0 \/1. 4, 1, co co X on coom U)a. m v Ino °^ 5- N 5- N n N n 0) o CO N M o o v� o NI. N II) M M N a N N M a N M tea0 cza Z. CV H + C •0 m • CL. 7 co Yr '2, aN MOm N N W UCC — N N a N 0 V NO a N N4) N ( l) aa M a (n '' a O ta z' . 0) W 0 0) 0) 0 0) 0 co co n 0) n n m COO) n n n COCOn N CON 0) n d Q Z, m > N r (EOO m 9. Sia. N Z W N l b� c .C9 _o , -� L 03 CO 0 0) (0 r N� N 0) CO N O 0) O 0) n N 0 p 0 O .V.. N M M O N O M 0 N Q O f7 O n n a )0 O ^ n N ^ 11] n V O N m a M 0 (h a 1f1 6 co N N N 0 0 0 a n M co N Q r Y Z O Z a '° 0 (n o`LL C m 0 N O.E n n co n n .- N co 0 CO N co0co00n CO CO 0 00 (O N (O n U) COnn ((CU O n yfj 0n m )F E EU w U W m °ZO paAC0W1Q 5, C a NNNNrNNNNN N 0 M MM 0 N N n .- Mr rN N N N N 0CC ggj) N0 m N < ti ..J N o 0 iii m z 0 W N 0c0 N M 0 0) a a 0 Co 0 0 N O M0 '00 O N n O m M M N I- O W U m W 0) o O) 0 O) 0 0) n co CO a 0 M 0 M a a M M N 0 0 M M Ni. a co a _ d N N N N N N N N Cl N N N N N N N N N N y O to F' Q J )n a tq C72 m 0 F=- c p� M o n N N n o o a n a 01 co 0 o t0 co 0) E M M 0 M co n n n L y N O 0) 0 00 ) a O) �} N Q O N V N COm 0) W fV T' Cl {9 N N N N 0 N N N N N 0 e0- 2 0. `o C O `o 0) r C M n co O N n CO CO 1, C05- 5- 6510P- 0515- 051. 00051. 000 ,,, 2 (n B N ,- M N °) N Ort N N Mr m .988 .7 '4885; 0 n a a M N 3 •' N Cl N N N N N N N M C 5 f. 0 N C co m 2 O N N N N N N ^ N N - ^ N N N N - ,Ov N N CU N N o N N N = m 2 0 r r r r O) 0 N U E. a w m c c 2 Y m 5 E co 0 U) 0 0 0 0 0 In 0 0 O 0 0 0 0 0 0 0 0 CO 0 0 0 0 )f) 0 If) 0 0 21 E mW m d Y i-i Z `o �a H m m a c ImCO 0 (0 (O t0 0 t0 m 0 0 0 0 m 0 ID CO CO CO CO m b CO ID to co 0 0 {0 0 5 2 g `o r mc� d fd QdQ f: d 6 fcc677 (qq5 0 m 6 4.qq d�� oS n' Ids� 6 c5 m ,,_si 6 ' 4 6 v5 „A m' 5 o 0 G o 0 0 0 o S o 0 0 0 0 ; o 0 8 i i 8 i ; i b i l ; i o b t c m 0 a; X 0 0 0 0 0 0 0 0 0 0 Cl 0g 0 0q 0 8 O o o O o 0 0 8 m d a d d o d o o 0 0 $ S a 0 UggRc 2 dO) O N (UI [7 '0 l+) COCOU) o O f� SIS C) d O 4p N 0 N m X M a a CO CO 0 �7 1n v v 1� ' ui 'fit 0 a u6i U6 U m O) Xx CO CO CO CO CO M N N M M E C Q N N N N N N N Ni N N N N N N N N N N N N N N N N N N N N N N o 00 N N N N N N D) N N N N N N N N N N N N N N N N N N N N N N 0 0 dQ �0 O O Qa 0 (0 ((0 (0 (0 (d0 m 0 m O (0 (0 m m CO' O 6 1(00 I Ido to 10 10 )O N 110 Yl Ido U)) (1) Y] C)) U)) If) 100 10 60 H 0 (t0 (O 1a0 (1) N 0 It. 2 Om C N m r 41 G S. 9 m 4' E Y CO o 0 P A Z o rasa o o M O o c0 Z W W 1.-. n Z W Z 0 _ n r z _a,' 15 a a a a in a a CO a a o F tn Z () W '� v E ° ? O 0. 0 0 0 d N CO CL Or CO O) 9 -! LL Z LL f0 ll Z N Z C0�{ Z Z p3 5 4. �5 (5 .y. a 0clic 0 1 N 1 d N N f` N N !7 !9 m 'C co w 3 a a a a a a a a n. a a a a a a a a a a a a N a a a a a a a a — - a 0 0 0 0 0 0 0 0 0 0 0 0 0 (n CO CO CO CO (A CO CO N co co co co co co co N ¢ — Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: August 15, 2013 Surface Data Logging End of Well Report SP36-W5 SP36-W5 L1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Show Reports 7. Mud Record 8. Bit Record 9. Morning Reports 10. Survey Report Digital Data to include: Final Logs Halliburton Log Viewer EMF Log Viewer EOW Report PDF Version ADI Backup GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Doyon 15 Well: SP36-W5 & SP36-W5 L1 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23492-00-00 (SP36-W5) 50-629-23492-60-00 (SP36-W5 L1) Sperry Job Number: AK-AM-0900577139 Job Start Date: 28 June 2013 Spud Date: 30 June 2013 Total Depth: 21813’ MD, 3396.14’ TVD (SP36-W5) 20870’ MD, 3422.79’ TVD (SP36-W5 L1) North Reference: True North Declination: 19.825° Dip Angle: 81.079° Total Field Strength: 57610.778 nT Date Of Magnetic Data: 27 July 2013 Wellhead Coordinates N: North 70° 33’ 27.62282” Wellhead Coordinates W: West 149° 54’ 23.07478“ Drill Floor Elevation 53.67’ Ground Elevation: 13.10’ Permanent Datum: Mean Sea Level SDL Engineers: Leigh Ann Rasher, Kori Jo Plowman, Clifton Posey, Alexander Kalenuik, Jeremy Tiegs SDL Sample Catchers: Chris Woolley, Chance Taylor, Jason Ostrem, Jeremy Tiegs Company Geologist: Andrew Buchanan Company Representatives: Jack Keener, Mike Ross SSDS Unit Number: 110 DAILY SUMMARY 06/28/2013 SDL continues on location from previous well. Move rig. 06/29/2013 Spot and set mudlogging shack. Wait on the unit to warm up before rigging up. Rig up mudlogging shack. Continue rig up operations on rig. Rig up suitcases and test. Pick up 5” drill pipe. Perform 13-3/8” dummy hanger run. Rack back heavy weight drill pipe, jars, and non magnetic drill flex collar. Fill conductor and check for leaks. Pressure test mud pumps. Pick up conductor clean out BHA #1. Tag bottom at 62’ MD. Clean out conductor at 126’ MD. 06/30/2013 Circulate hole clean. Pull out of hole from 165’ MD. Pick up BHA #2 and shallow test MWD tools. Drill ahead to 405’ MD and back ream out of hole to pick up BHA. Run in hole to 405’ MD and drill ahead to 1151’ MD. No samples collected during surface section. Gas: The max gas was 52 units at 1056’ MD. 07/01/2013 Drill ahead from 1151’ MD to 3110’ MD. Gas: The max gas was 1455 units at 2238’ MD. 07/02/2013 Drill ahead from 3110’ MD to surface section TD of 3484’ MD. Back ream out of hole per K&M rep. Lay down BHA #2 and begin rigging up casing equipment. Gas: The max gas was 94 units at 3450’ MD and 886 units while back reaming out of hole. 07/03/2013 Continue to rig up casing equipment. Run in hole to 315’ MD and make up shoe track. Continue to run in hole with 13-3/8” casing to 3470’ MD. Circulate and condition mud. Rig up cement equipment and cement 13-3/8” casing. Gas: The max gas was 118 units. 07/04/2013 Continue to cement 13-3/8” casing. Rig down cement equipment and lay down landing joint. Nipple down diverter stack and nipple up BOP stack. Set test plug and test BOP. Begin picking up 5” drill pipe. 07/05/2013 Test BOP. Continue to pick up 5” drill pipe. Pick up and make up BHA #3. Run in hole with BHA #3 and test tools. Continue to run in hole. 07/06/2013 Continue to run in hole to 3242’ MD. Wash down to top of cement plug at 3382’ MD and circulate bottoms up. Test 13-3/8” casing to 2500 psi for 30 minutes. Drill shoe track and rat hole to 3484’ MD. Drill 20’ of new formation to 3504’ MD. Displace mud to LSND and cut and slip drill line. Perform leak off test to 11.16 ppg EMW. Drill ahead from 3504’ MD to 4640’ MD. Gas: The max gas was 286 units at 3713’ MD. Geology: Cuttings consist mainly of sandstone with local silts. 07/07/2013 Drill ahead from 4640’ MD to 7910’ MD. Gas: The max gas was 117 units at 4994’ MD. Geology: Cuttings consist mainly of sandstone with local silts and some coal cuttings from 4900’ MD to 5000’ MD. 07/08/2013 Drill ahead from 7910’ MD to 9400’ MD. Gas: The max gas was 41 units at 8815’ MD. Geology: Cuttings consist mainly of sandstone. 07/09/2013 Drill ahead from 9400’ MD to 9599’ MD. Begin back ream out of hole due to low ROP. Gas: The max gas was 29 units at 9404’ MD. Geology: Cuttings consist mainly of clean sandstone. Metal shavings observed in samples. 07/10/2013 Continue to back ream out of hole. Lay down BHA #3. Pick up BHA #4 and begin run in hole. Gas: The max gas was 48 units. Geology: Cuttings consist mainly of sandstone. 07/11/2013 Continue to wash and ream to 9599’ MD. Drill ahead from 9599’ MD to 12015’ MD. Gas: The max gas was 525 units at 11361’ MD. Geology: Cuttings consist mainly of clean sandstone with some silt from 9599’ MD to 11500’ MD. Siltstone became dominant with some sand and 5-10% shale fragments from 11550’ MD to 12000’ MD. 07/12/2013 Drill ahead from 12015’ MD to intermediate TD of 12405’ MD. Begin back ream out of hole. Gas: The max gas was 70 units at 12333’ MD and 81 units while back ream out of hole. Geology: Cuttings consist mainly of siltstone with some sand and shale. 07/13/2013 Continue to back ream out of hole. Lay down BHA #4. Test rams and begin to rig up casing equipment. Gas: The max gas was 26 units. 07/14/2013 Continue to rig up casing equipment. Make up shoe track to 165’ MD. Run in hole with 9-5/8” casing. Make up landing joint and land casing at 12390’ MD. Rig down casing equipment and begin to fill casing. 07/15/2013 Continue to fill 9-5/8” casing. Rig up cement equipment and cement 9-5/8” casing. Rig down cement equipment and prepare to cut casing. 07/16/2013 Nipple up BOP equipment and test pack off. Set test plug and test body. Pick up 4.5” drill pipe. Cut and slip line, and service draw works. Rig up and test BOPE. 07/17/2013 Complete BOP test. Pick up BHA #5 and 8.75” PDC bit. Run in hole to 1213’ MD and shallow test. Continue to run in hole. Ream in hole at 40 rpm to 12188’ MD. Wash and ream to 12281’ MD. Test casing to 3000 psi for 30 minutes. Prepare to displace LSND mud to oil based mud. 07/18/2013 Displace LSND mud to oil based mud. Drill shoe track cement to shoe and 20’ of new hole to 12425’ MD. Drill 8.75” production hole with tapered drill string. Gas: The max gas was 1305 units at 13455’ MD. Geology: Samples consist of mainly clean sandstone. 07/19/2013 Drill ahead from 13772’ MD to 16137’ MD. Gas: The max gas was 1989 units at 14940’ MD. Geology: Samples consist of mainly clean sandstone. 07/20/2013 Drill ahead from 16137’ MD to 18629’ MD. Gas: The max gas was 1217 units at 18390’ MD. Geology: Samples consist of mainly clean sandstone. 07/21/2013 Drill ahead from 18629’ MD to 19843’ MD. Gas: The max gas was 1095 units at 19130’ MD. Geology: Samples consist of mainly clean sandstone. 07/22/2013 Drill ahead from 19843’ MD to 21813’ MD. Gas: The max gas was 1036 units at 19904’ MD. Geology: Samples consist of mainly clean sandstone. 07/23/2013 Back ream out of hole from 21813’ MD to 11729’ MD. 07/24/2013 Back ream out of hole from 11729’ MD. Cut and slip drill line. 07/25/2013 Run in the hole with 5.5” liner to 21813’ MD. Set casing shoe. 07/26/2013 Complete work on top drive. 07/27/2013 Rig up wireline equipment. Moisture related interference with the tools caused malfunctions. 07/28/2013 Run in hole with Baker bullnose. Pull out of hole from clean out line. Rigged up wireline and ran tools down hole with no problems. 07/29/2013 Test BOP’s. 07/30/2013 Run in hole with Whipstock Mill, set the Whipstock, displace mud, and then perform top drive maintenance. Gas: The max gas was 30 units at 11472’ MD. 07/31/2013 Drill ahead from 11482’ MD to 11501’ MD to drill out window in the casing. Gas: The max gas was 25 units at 11485’ MD. Geology: Samples consist of mainly clean sandstone. 08/01/2013 Drill ahead from 11501’ MD to 11620’ MD. Pull out of hole to change out BHA and remove mud motor. Gas: The max gas was 63 units at 11620’ MD. Geology: Samples consist of mainly clean sandstone. 08/02/2013 Drill ahead from 11620’ MD to 12465’ MD. Back ream out of hole from 12465’ MD to 11454’ MD and perform a FIT. Run in hole and drill ahead. Gas: The max gas was 805 units at 12582’ MD. Geology: Samples consist of mainly clean sandstone. 08/03/2013 Drill ahead from 12652’ MD to 15364’ MD Gas: The max gas was 2145 units at 15320’ MD. Geology: Samples consist of mainly clean sandstone and some siltstone. 08/04/2013 Drill ahead from 15364’ MD to 17789’ MD Gas: The max gas was 1333 units at 17724’ MD. Geology: Samples consist of mainly clean sandstone. 08/05/2013 Drill ahead from 17789’ MD to 19636’ MD Gas: The max gas was 978 units at 19562’ MD. Geology: Samples consist of mainly clean sandstone. 08/06/2013 Drill ahead from 19636’ MD to 20870’ MD. Well SP36-W5L1 has reached TD. BROOH started. Gas: The max gas was 841 units at 20869’ MD. Geology: Samples consist of mainly clean sandstone. 08/07/2013 Back ream out of hole from 20870’ MD to 9994’ MD. 08/08/2013 Back ream out of hole from 9994’ MD to surface. Start to run in hole with BHA #9 to retrieve the whipstock but MWD equipment began to malfunction and had to pull out of hole from 2883’ MD. 08/09/2013 Debris was visible in the MWD components and was removed. Run in hole from surface to 11441’ MD and tagged the hook slot for whipstock and successfully retrieved it. Begin to pull out of hole. 08/10/2013 Continue to pull the whipstock BHA out of the hole and then lay down the BHA. Rig up Franks casing running equipment. Start to run in hole with 5.5” liner from surface to 6027’ MD. 08/11/2013 Continue to run 5.5” liner. Liner top is at 11220’ MD. Prepare to displace mud. 8/12/2013 Displace oil-based mud to Brine. Slip and cut drill line. Pull out of hole and lay down 5” drill pipe, and running tool. Rig up and begin testing BOP’s. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000 24000 0 5 10 15 20 25 30 35 40 45 Me a s u r e d D e p t h Rig Days Prognosed Actual Days vs. Depth 28 Jun 2013 Sperry SDL continues on location from previous well WELL NAME: SP36-W5 & SP36-W5 L1 OPERATOR: ENI Petroleum MUD CO: MI Swaco RIG: Doyon 15 SPERRY JOB: AK-AM-0900577139 LOCATION: North Slope AREA: Spy Island STATE: Alaska SPUD: 30-Jun-2013 TD: 6-Aug-2013 Commenced 16" Surface Hole Section On Bot: 07:00 30 Jun 2013 TD Surface Hole Section 3484' MD, 2452' TVD Off Bot: 07:30 02 Jul 2013 Landed 13 3/8" Casing 3470' MD, 2450' TVD 03 Jul 2013 Commenced 12.25" Intermediate Hole Section On Bot: 1530 06 Jul 2013 Drill 12.25" hole to 9599' MD POOH due to low ROP Off Bot: 06:10 09 Jul 2013 Resume 12.25" Hole Section On Bot: 05:15 11 Jul 2013 TD Intermediate Hole Section 12405' MD, 3506' TVD Off Bot: 04:05 12 Jul 2013 Landed 9 5/8" Casing 12390' MD, 3507' TVD 14 Jul 2013 Commenced 8.75" Production Hole Section On Bot: 07:42 17 July 2013 TD Production Hole Section 21813' MD, 3745' TVD Off Bot: 20:15 22 July 2013 Run 5.5" liner and RIH with Whipstock Mill. Set whip stock in preperation for SP36-W5 L1 23-30 July 2013 Commenced 8.75" Production L1 Hole Section On Bot: 17:15 04 Aug 2013 TD Production Hole Section 20870' MD, 3539' TVD Off Bot: 17:30 06 Aug 2013 WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION:Surface EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-AM-0900577139 Leigh Ann Rasher 4-Jul-2013 SP36-W5 What went as, or better than, planned: The gas chromatograph had a lot of "noise" during surface section. We are not sure if it was the cord connecting the chromatograph to the Iris computer or if it is a problem with the chromatograph itself. During the surface section casing run the chromatograph and cord were switched out and no problems have been experienced since. Recommendations: Innovations and/or cost savings: Surface section was completed with no major issues. Weight on bit tracked better than normal after checking the "Use 3rd Party WOB" box under the WOB configurations in the 'Configure and Monitor Rig Floor' window. Difficulties experienced: Use the "WOB from 3rd party" options for upcoming wells. After well is complete looking into getting new cord sent out for the chromatograph to find out if that solves the problem with "noise". If not the old chromatograph should be sent to town and a new backup should be sent to location. N/A Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION:Intermediate EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-AM-0900577139 Leigh Ann Rasher 13-Jul-2013 SP36-W5 What went as, or better than, planned: No major difficultes were experienced. The canrig computer did freeze towards the beginning of the section and was fixed by closing out the RigWatch program and restarting it. The bit depth got thrown off a few times during connections. Recommendations: Innovations and/or cost savings: Intermediate section was completed with no major problems. The gas chromatograph was switched out after surface casing was cemented and functioned well. Difficulties experienced: Compare bit depth with the pipe tally during each connection to make sure it stays on track. N/A Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 ENI Petroleum AK-AM-0900577139 Paul Kalenuik 25-Jul-2013 SP36-W5 What went as, or better than, planned: During the drilling of the production run, we had and electrical issue with the cord on the Workstation computer. The connection between the computer and the cord had a gap and there was a short. We disconnected the cord and replace it. That solved the issue and it has been operating fine ever since. Recommendations: Innovations and/or cost savings: This section was completed with no major issues. Can Rig tracked better than normal. We experiencede no failures from Can Rig. Depth tracked better than expected also. The bore tracked within a tenth of a foot to one foot with the Wits data we recieved from SLB. Difficulties experienced: Provide or install a monitor on the rig floor so that our drilling parameters can be tracked by them. Very often the drilling depth that is on the Can Rig monitor is different from the depth that SLB and Insite is showing. This would allow for more acurate tracking of depth for all parties. N/A Surface Data Logging After Action Review WELL NAME:LOCATION:North Slope OPERATOR:AREA:Spy Island SPERRY JOB:STATE:Alaska RIG:Doyon 15 HOLE SECTION:Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 What went as, or better than, planned: During the drilling of the production run, L1, we had an issue with the gas chromatograph powering down. Chromatograph data was lost from roughly 18200' MD to 19000' MD. Recommendations: Innovations and/or cost savings: Production section, L1, was completed with no major issues. Can Rig tracked better than normal. We experienced no failures from Can Rig. Depth tracked better than expected also. Difficulties experienced: Check power connections to gas equipment and make sure the 8900 Chromatograph within Insite is always running. N/A ENI Petroleum AK-AM-0900577139 Kori Jo Plowman 7-Aug-2013 SP36-W5 L1 Surface Data Logging After Action Review WELL NAME:SP36-W5 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO:M I Swaco STATE:Alaska RIG:Doyon 15 SPUD:30-Jun-2013 SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013 Marker MD INC AZ TVD TVDSS 16" Surface Borehole 20" Conductor Shoe 160.0 0.6 173.5 160.0 -106.3 SV-4 769.0 19.6 199.6 758.7 -705.0 SV-3 1,164.0 31.0 193.5 1,112.1 -1,058.4 SV-2 1,480.00 36.8 192.1 1,373.1 -1,319.4 Permafrost Base 1,980.0 44.7 197.7 1,746.4 -1,692.8 SV-1 2,233.0 53.0 198.3 1,910.9 -1,857.2 Ugnu Top (UG4)2,829.0 57.7 215.9 2,217.5 -2,163.8 13 3/8" Casing Shoe 3,470.0 81.4 235.2 2,451.9 -2,398.3 TD 16" Borehole 3,484.0 81.6 235.3 2,454.0 -2,400.3 12 1/4" Intermediate Borehole Fault 4 4,951.0 83.1 228.5 2,634.2 -2,580.5 UG-2 Coal Bed Marker 5,010.0 83.4 228.5 2,641.1 -2,587.4 Lower Ugnu 8,831.0 82.9 231.0 3,127.2 -3,073.5 Schrader Bluff 10,233.0 82.5 255.3 3,315.6 -3,261.9 N Sequence Top 10,516.0 82.8 270.6 3,352.1 -3,298.4 N Sand Top 10,827.0 84.4 277.6 3,386.0 -3,332.3 N 2 10,916.0 84.5 279.4 3,394.5 -3,340.8 N 3 10,956.0 84.6 280.1 3,398.3 -3,344.6 N Sand Bottom 11,087.0 84.5 282.9 3,410.9 -3,357.2 N Sequence Base 11,542.0 84.1 293.8 3,455.4 -3,401.7 9 5/8" Intermed. Casing 12,390.0 87.0 314.9 3,503.8 -3,450.1 TD 12 1/4" Borehole 12,405.0 87.0 314.6 3,504.6 -3,450.9 8 3/4" Lateral OA Sand Top 12,682.0 85.3 310.4 3,519.8 -3,466.1 OA sbl 2 Top 12,741.0 85.8 310.1 3,525.0 -3,471.3 OA sbl 3 Top 12,818.0 87.6 309.7 3,529.3 -3,475.6 OA sbl3 Top 13,934.0 92.9 311.1 3,523.2 -3,469.5 OA sbl 2 Top 14,201.0 91.3 311.4 3,516.8 -3,463.1 OA sbl2 Top 15,018.0 89.1 311.4 3,510.2 -3,456.5 OA sbl3 Top 15,264.0 88.6 311.2 3,512.2 -3,458.5 OA sbl3 Top 16,850.0 92.4 312.1 3,511.3 -3,457.6 OA sbl2 Top 16,990.0 91.7 311.8 3,505.4 -3,451.7 Fault 1 17,473.0 90.0 310.8 3,503.5 -3,449.8 OA Sand Top 17,694.0 86.3 310.1 3,535.6 -3,481.9 OA sbl2 Top 18,629.0 88.0 310.7 3,543.7 -3,490.0 OA sbl3 Top 18,819.0 87.1 310.6 3,554.2 -3,500.5 OA sbl3 Top 19,551.0 90.0 312.3 3,557.4 -3,503.7 OA sbl 3 Top 19,615.0 88.1 311.8 3,559.1 -3,505.4 Fault 2 19,862.0 89.0 311.6 3,574.3 -3,520.6 OA sbl2 Top 19,907.0 91.3 311.6 3,574.2 -3,520.5 OA Sand Top 20,076.0 92.8 312.5 3,567.5 -3,513.8 OA Sand Top 20,431.0 85.7 311.3 3,578.2 -3,524.5 OA Sand Top 20,967.0 92.2 311.8 3,588.8 -3,535.1 N Sequence Base 21,364.0 105.7 310.8 3,539.6 -3,485.9 N Sand Bottom 21,520.0 110.3 311.1 3,490.6 -3,436.9 N Sand Top 21,639.0 111.5 310.7 3,448.4 -3,394.7 N Sequence Top 21,656.0 111.9 310.7 3,442.1 -3,388.4 TD 8 3/4" Lateral 21,813.0 113.4 311.4 3,396.1 -3,342.5 Formation Tops WELL NAME:SP36-W5 L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO:M I Swaco STATE:Alaska RIG:Doyon 15 SPUD:30-Jun-2013 SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013 Marker MD INC AZ TVD TVDSS 8 3/4" Leg 1 Top of Window 11,437.0 84.4 290.8 3,444.9 -3,391.2 Bottom of Window 11,454.0 84.4 288.7 3,446.5 -3,392.9 N Sequence Base 11,542.0 83.4 289.8 3,455.9 -3,402.2 OA Sand Top 12,419.0 86.7 313.3 3,517.4 -3,463.7 OA sbl2 12,567.0 90.1 314.8 3,522.2 -3,468.5 OA sbl2 12,630.0 90.8 314.5 3,521.9 -3,468.2 OA sbl2 13,982.0 86.8 309.1 3,515.8 -3,462.1 OA sbl3 14,049.0 87.1 310.7 3,519.5 -3,465.8 OA sbl3 15,547.0 92.0 311.9 3,515.8 -3,462.1 OA sbl2 15,653.0 92.2 312.3 3,511.2 -3,457.5 OA sbl2 16,661.0 86.6 310.8 3,500.1 -3,446.4 OA sbl3 16,754.0 88.0 310.1 3,505.2 -3,451.5 OA sbl4 17,649.0 87.5 310.9 3,530.2 -3,476.5 OA sbl4 18,022.0 92.1 312.9 3,534.9 -3,481.2 OA sbl3 18,431.0 92.4 316.2 3,529.9 -3,476.2 OA sbl2 18,499.0 92.5 316.0 3,526.7 -3,473.0 OA Sand Top 19,119.0 89.9 310.8 3,525.0 -3,471.3 OA Sand Top 19,178.0 88.5 311.9 3,526.6 -3,472.9 Fault A 19,262.0 87.1 312.1 3,530.6 -3,476.9 OA Sand Top 19,366.0 85.6 311.0 3,537.2 -3,483.5 OA sbl2 19,492.0 86.2 311.0 3,546.8 -3,493.1 Fault B 19,596.0 86.5 309.8 3,553.0 -3,499.3 OA Sand Top 19,647.0 86.9 309.3 3,556.0 -3,502.3 OA sbl2 20,000.0 87.1 309.7 3,564.2 -3,510.5 OA sbl2 20,248.0 91.5 310.5 3,563.9 -3,510.2 Fault C 20,470.0 88.8 310.5 3,563.4 -3,509.7 OA sand base 20,558.0 91.9 310.7 3,563.5 -3,509.8 Fault D 20,630.0 92.8 312.2 3,560.0 -3,506.3 TD 8 3/4" L1 20,870.0 97.2 314.0 3,539.8 -3,486.1 Formation Tops Show Report Rt # 1 Show Report Report # 1 Well Name: Depth (MD) to ft Location:(TVD)to ft 11400 3445 10800 3380 SP36-W5 Spy IslandLocation:(TVD)to ft Operator: Report Prepared By:Formation: 34453380 N Sand Spy Island ENI Petroluem Leigh Ann RasherReport Prepared By:Formation: Report Delivered To: Date: N-Sand 11-Jul-2013 Leigh Ann Rasher Andrew Buchanan Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Interpretation: Hydrocarbon Ratios Dt h ft G Ui t Md C h l i d ( / L )C1 C1 C1 C1 1 150010850343DepthftGasUnitsMud Chlorides (mg/L) =C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 150010850343 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =42372 7239601 2771 1000 C2 -=C1/C3 = C3 -=C1/C4 = 548 154 7 147 573 25 269 184 C4 -=C1/C5 = C5 -=0 71 71 558215 222 7 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 100 Depth ft Gas Units Mud Chlorides (mg/L) = Fl li Bk d Sh 2 150010937 301 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = 2771 70 247514 37070 34299 489 25 10 C3 -=C1/C4 = C4 -=C1/C5 = 7 139 173 7 146 166 207 953 Oil C5 -= Production 36 0 36 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios3 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 25811047 1500 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =31008 6542 24466 71 1000C1C1/C2 C2 -=C1/C3 = C3 =C1/C4 =155 99 56 453 109 344 31008 6542 24466 247 302 71 NPH C4 -=C1/C5 = C5 -= 184 44 103 81 -10 54 -2447 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 100 Depth ft Gas Units Mud Chlorides (mg/L) = 4 52511361 1500 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = 52325 16167 839 273 566 36158 120 64 10 OilC2C1/C3 C3 -=C1/C4 = C4 -=C1/C5 =550 288 262 839 273 566 463 162 301 120 138 36158 C5 -= Production 213 212 1 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 22-Jul-2013 91000 119 SP36-W5 Spy Island ENI Petroluem Paul Kalenuik Andrew Buchanan 79 127177 Interpretation: Show Report Report # 2 15127 3516 13411 3539 OA-Sand 131 48 114 5 22 91 398 453 924 166 21820 108 336 1347 13535 116289 12666 104 1243 1083 -10363 91000 259 334 122 116000 149 198 21 930 970 -40 1144 1200 799 830 126934 124558 2376 116814 103623 185 267 -56 648-31 1182 1162 20 444 1082 85 1060 463 1167 597 988 535 453 1477 1236 241 1090 882 12 851 870 171024 149204 1587815127 543 383 No producible oil within these zones based upon gas and chromatograph data collected. 160 115214474 106000134111265 1 2 3 4 601 410 191 283 -16 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis x Gas Oil Water Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 570 55 515 24 288 667 31 No producible oil within these zones based upon gas and chromatograph data collection. 636 111516695 2000160371115 1275 1043 562 232 94517 3669 47516879 461 75 386 1161 58 1103 1052 1432 184 1248 692 83 1152 548 63 1235 485 116846 9043 107803 63106 2314 89 312 675 210616 611 65 546 728 53 663 47 60389 2000 111 98 85 2000 101 103 239 1423 16310 118230 115916 1367 56 1115 140 422 72 980 90848 633 59 93 235 176 255 170 82 Interpretation: Show Report Report # 3 17000 3510 16000 3524 OA Sands 25-Jul-2013 2000 86 SP36-W5 Spy Island ENI Petroluem Kori Jo Plowman Andrew Buchanan 182 2717 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 390 61 329 54 268 338 70 No producible oil within these zones based upon gas and chromatograph data collected. 268 87720625 2000197801187 519 446 307 73 110557 6465 101620903 381 81 300 1149 94 1055 608 975 106 869 310 116 492 328 94 608 234 98088 9398 88690 129336 9244 102 322 1222 464749 825 74 751 1300 78 820 71 124261 2000 165 166 104 2000 192 199 404 1036 20009 103760 94516 908 128 949 68 239 75 533 104092 258 52 195 347 316 371 344 99 Interpretation: Show Report Report # 4 20900 3604 19700 3575 OA Sands 25-Jul-2013 2000 102 SP36-W5 Spy Island ENI Petroluem Kori Jo Plowman Andrew Buchanan 353 5075 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Show Report Report # 5 Show Report Report # 5 Well Name: Depth (MD) to ft Location: (TVD) to ft SP36-W5 Spy Island 20900 3604 19700 3575 Location: (TVD) to ft Operator: Report Prepared By: Formation: Spy Island ENI Petroluem Kori Jo Plowman 3604 3575 OA Sands Report Prepared By: Formation: Report Delivered To: Date: 25-Jul-2013 Kori Jo Plowman Andrew Buchanan OA Sands Interpretation: Interpretation: No producible oil within these zones based upon gas and chromatograph data collected. Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 2000 19780 1187 1 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 2000 19780 1187 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =5075 124261 129336 102 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 - =C1/C4 = 5075 124261 165 166 825 74 751 1300 78 129336 102 1222 NPH C4 - =C1/C5 = C5 - = 825 74 751 820 71 322 464 749 54 268 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 2 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 20009 949 2000 2 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =1036 103760 94516 908 128 104 192 9244 10 C2 -=C1/C3 = C3 - =C1/C4 = C4 - =C1/C5 =353 1036 908 128 192 404 116 492 328 94 608 234 Oil C4 C1/C5 = C5 - = Production 353 328 94 234 338 70 268 1 NPH Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 2000 877 20625 3 Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 . Flowline Background Show C2 C3 C4 C5 ppm ppm ppm 2000 877 20625 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 =102 98088 9398 88690 1000 C1 -=C1/C2 = C2 - =C1/C3 = C3 =C1/C4 = 102 371 199 98088 9398 88690 975 106 869 519 446 73 NPH C3 =C1/C4 = C4 - =C1/C5 = C5 -= 371 344 68 239 258 52 310 519 446 307 73 NPH C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 258 52 310 4 100 Depth ft Gas Units Mud Chlorides (mg/L) = . Flowline Background Show 2000 1016 20903 4 Gas Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10 Hydrocarbon Ratios C1 - =C1/C2 = C2 -=C1/C3 =195 99 104092 1149 94 1055 110557 6465 10 Oil C2 -=C1/C3 = C3 - =C1/C4 = C4 -=C1/C5 = 195 347 316 75 533 381 81 300 1149 94 1055 608 NPH C4 -=C1/C5 = C5 - = Production 316 0.00 381 81 300 390 61 329 1 NPH Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis x Gas Oil Water Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 4-Aug-2013 91000 192 SP36-W5 L1 Spy Island ENI Petroluem Paul Kalenuik Andrew Buchanan 170 158427 Interpretation: Show Report Report # 6 15279 3283 14676 3283 OA-Sand 300 54 212 198 490 158 493 379 772 75 22504 153 374 1234 14837 101214 38823 396 838 2145 15961 91000 55 58 98 91000 128 333 116 1212 921 291 1541 1222 1239 962 185482 110454 75028 174388 62391 50 501 319 161277 1356 965 391 527 787 304 818 483 1091 335 825 411 414 1095 953 142 847 998 225 872 773 112793 90289 102015279 594 365 No producible oil within these zones based upon gas and chromatograph data collected. 229 181114924 91000146761668 1 2 3 4 485 379 106 402 99 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 499 381 118 480 4 572 441 No producible oil within these zones based upon gas and chromatograph data collected. 131 107217303 84000166211079 1156 74 1047 1082 99126 94475 91218018 916 438 478 1143 1086 57 947 1356 1264 92 597 1082 33 1046 480 1115 566 116498 108152 8346 112980 107794 87 484 18 39414 1113 1094 19 1283 1265 1088 1074 1574 83000 83 112 117 84000 195 113 11 1293 17075 114215 6421 55 1238 1061 498 549 912 35 4651 178 419 133 10 39 15 47 82 Interpretation: Show Report Report # 7 18018 3538 16621 3500 OA-Sand 5-Aug-2013 83000 91 SP36-W5 L1 Spy Island ENI Petroluem Paul Kalenuik Andrew Buchanan 49 111406 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator: Report Prepared By:Formation: Report Delivered To:Date: Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Gas Units Mud Chlorides (mg/L) = Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons 1 2 3 4 344 303 41 349 10 411 343 No producible oil within these zones based upon gas and chromatograph data collected. 68 84119691 8400019240715 801 22 1047 779 79046 73609 70620345 916 438 478 913 845 68 483 1112 1086 26 465 695 36 1046 480 731 566 91713 87745 3968 78674 77102 99 359 57 56425 773 748 25 989 932 805 780 5637 82000 225 225 77 83000 97 180 6 973 19457 80585 3483 45 928 739 498 549 442 41 5437 74 391 133 11 133 7 54 80 Interpretation: Show Report Report # 8 20345 3565 19240 3532 OA-Sand 11-Aug-2013 83000 153 SP36-W5 L1 Spy Island ENI Petroluem Jeremy Tiegs Andrew Buchanan 51 73037 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH SP36-W5 & SP36-W5 L1 ENI Petroleum MI Swaco Doyon 15 AK-AM-0900577139 Date Depth Wt Vis PV YP Gels Filt R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++ 29-Jun 62'8.70 130 49 52 18/31/42 5.8 150/101/80/56/20/18 2/-2.0 .5/97.5 0.00 0.08 9.6 22.5 .01/.18 500 160 Clean Conductor 30-Jun 784'9.00 76 24 27 17/46/55 5.0 75/51/42/32/17/15 2/-3.8 1/95.25 0.15 0.08 9.4 21.0 .02/.21 2100 160 Drill 16" Surface 1-Jul 2870'9.40 89 30 33 17/48/66 5.4 93/63/51/37/18/16 2/-5.0 1/94 0.10 0.10 9.5 23.5 .05/.28 1500 60 Drill 16" Surface 2-Jul 3484'9.40 92 29 37 25/53/67 5.5 95/66/54/41/20/18 2/-5.0 1/94 0.10 0.20 9.6 22.5 .09/.22 950 120 R/U Casing 3-Jul 3484'9.30 44 23 12 10/11/13 -58/35/27/17/5/4 -----8.0 ----Cement Surface 4-Jul 3484'9.10 35 22 9 7/8/10 -53/31/23/13/4/3 -----8.3 ----P/U 5" DP 5-Jul 3484'9.30 50 9 20 10/11/14 6.4 38/29/25/19/13/9 1/-4.0 2/94 -0.22 9.7 -.10/1.00 300 280 RIH 6-Jul 4150'9.30 49 10 26 10/14/15 6.2 46/36/31/24/12/10 1/-4.0 2/94 0.15 0.15 9.9 2.5 .10/1.10 700 160 Drill 12.25" Intermediate 7-Jul 7320'9.30 59 15 35 19/30/35 5.0 65/50/43/34/15/12 1/-5.5 2/93 0.10 0.14 9.7 17.5 .05/.90 1400 100 Drill 12.25" Intermediate 8-Jul 9295'9.30 51 12 27 17/28/36 5.3 51/39/33/26/14/12 1/-5.0 2/93 0.10 0.15 9.5 17.5 .06/.90 1700 100 Drill 12.25" Intermediate 9-Jul 9599'9.35 62 16 32 16/36/55 5.1 64/46/41/33/17/15 1/-6.0 2/92 0.10 0.10 9.6 22.5 .07/.90 1700 100 BROOH 10-Jul 9599'9.20 56 17 26 18/35/48 5.3 60/43/36/28/15/13 1/-6.0 2/92 0.10 0.10 9.6 22.5 .05/1.00 1450 120 RIH BHA #4 11-Jul 11679'9.50 62 18 32 23/44/59 5.2 68/50/42/33/18/16 1/-8.0 2/90 0.10 0.10 9.5 22.5 .04/.90 1600 100 Drill 12.25" Intermediate 12-Jul 12405'9.45 52 13 25 23/47/65 5.2 51/35/33/26/14/12 1/-8.0 2/90 0.15 0.15 9.6 23.0 .06/.90 1400 100 BROOH 13-Jul 12405'9.40 49 12 25 18/36/53 5.2 49/37/31/24/14/12 1/-8.0 2/90 0.10 0.20 9.7 21.0 .07/.80 1100 100 R/U Casing 14-Jul 12405'9.50 64 16 23 13/30/51 5.0 55/39/34/26/13/11 1/-8.0 2/90 0.10 0.10 9.5 20.0 .05/.80 1100 100 Fill 9-5/8" Csg 15-Jul 12405'9.40 44 10 14 6/8/13 5.3 34/24/21/14/6/4 1/-7.5 2/91 0.10 0.08 9.1 15.0 .02/1.20 900 100 Prep csg cut 16-Jul 12405'9.40 49 12 25 18/36/53 5.2 49/37/31/24/14/12 1/-8.0 2/90 0.10 0.02 9.7 21.0 .07/.80 1100 100 R/U Casing 17-Jul 12405'9.30 50 9 18 6/6/7 -36/27/22/17/7/5 ----------Displace to OBM Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/ R6/R3 Cake Solids Oil/Water Alka POM Excess Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG 18-Jul 13419 9.35 47 16 14 6/7/7 3.2 46/30/24/17/7/6 -/2 6.62 65/35 2.75 3.58 519 35.01 -17.34/46.19 -Drill 8.75" Production 19-Jul 15913 9.3 46 15 17 6/7/7 3.2 47/32/25/18/7/6 -/1 7.17 66/34 2.2 2.86 783 32.19 -30.73/37.1 -Drill 8.75" Production 20-Jul 18250 9.3 47 16 16 7/7/8 3.0 48/32/26/18/7/6 -/1 6.92 66/34 3.1 4.03 996 32.83 -27.65/37.98 -Drill 8.75" Production 21-Jul 19651 9.3 45 16 15 7/7/8 3.2 47/31/25/18/7/6 -/1 7.14 67/33 3.2 4.16 1070 33.89 -19.29/47.17 -Drill 8.75" Production 22-Jul 21813 9.3 49 16 19 7/7/8 3.0 51/35/28/20/7/6 -/1 7.36 66/34 1.9 2.47 996 32.34 -38.28/30.89 -BROOH 23-Jul 21813 9.3 49 17 15 7/7/8 -49/32/25/18/7/6 -7.32 66/34 1.9 2.47 1050 31.46 -28.55/40.92 -BROOH 24-Jul 21813 9.3 50 17 15 7/7/8 -49/32/25/18/7/6 -7.32 66/34 2 2.6 1000 31.46 -31.28/37.98 -R/U 5.5" Liner Equipment 25-Jul 21813 9.3 50 15 16 7/7/8 -46/31/25/18/7/6 -7.37 66/34 2.4 3.12 850 31.22 -30.52/39.29 -Running in 5.5" Liner 26-Jul 21813 9.3 50 16 16 7/7/8 -48/32/26/18/7/6 -7.52 66/34 2.6 3.38 760 30.47 -30.88/40.37 -Repair Top Drive 27-Jul 21813 9.3 50 16 16 7/7/8 -48/32/25/18/7/6 -7.56 66/34 2.4 3.12 580 30.21 -31.15/40.56 -Prep Wireline Ops 28-Jul 21813 9.3 50 16 17 7/7/8 -49/33/26/18/7/6 -7.61 66/34 2.1 2.73 550 29.96 -28.12/44.31 -Circulate at 11502' MD 29-Jul 21813 9.3 50 16 17 7/7/8 -49/33/25/18/7/6 -7.66 66/34 2.2 2.86 480 29.7 -25.62/47.48 -BOP Testing 30-Jul 11480 9.25 50 15 17 6/7/7 -47/32/25/19/7/6 -6 64/36 3.25 4.23 325 31.72 -17.84/39.7 -Clean Surface Equipment 31-Jul 11480 9.25 49 15 15 6/7/7 -45/30/24/18/7/6 -6.01 64/36 3.00 3.9 370 31.72 -1.46/57.34 -Wash Down to 11480' MD 1-Aug 11617 9.25 50 16 16 7/8/8 4.0 48/32/26/19/7/6 -/1 6.0 64/36 3.00 3.90 365.0 31.5 -22.56/35.11 -Slip and Cut Drill Line 2-Aug 12465 9.20 50 16 18 7/8/8 4.0 50/34/28/20/8/7 -/1 6.5 66/34 3.30 4.29 400.0 32.8 -37.84/22.7 -Drill 8.75" L1 Hole 3-Aug 14959 9.20 46 14 19 8/8/8 4.0 47/33/27/20/8/7 -/1 7.4 66/34 2.60 3.38 550.0 29.2 -28.28/42.21 -Drill 8.75" L1 Hole 4-Aug 17507 9.20 47 15 19 8/9/9 3.7 49/34/28/21/8/8 -/1 7.1 67/33 2.70 3.51 660.0 30.6 -31.61/35.06 -Drill 8.75" L1 Hole 5-Aug 19396 9.2 46 13 21 8/9/9 3.7 47/34/28/21/8/7 -/1 7.01 68/32 2.90 3.77 735 31.31 -20.71/46.57 -Drill 8.75" L1 Hole 6-Aug 20870 9.15 47 14 21 9/9/9 3.8 49/35/30/23/9/9 -/1 7.08 61/39 3.00 3.9 770 31.05 -47.24/18.48 -BROOH 7-Aug 20870 9.2 46 14 18 7/8/8 3.8 46/32/27/20/8/8 -/1 7.11 69/31 2.80 3.64 750 31.55 -35.51/31.37 -BROOH 8-Aug 20870 9.2 45 14 18 7/8/8 -46/32/27/20/8/7 -7.11 69/31 2.70 3.51 745 31.55 -35.51/31.37 -POOH 9-Aug 20870 9.3 47 12 19 7/8/8 -43/31/26/19/8/7 -7.49 69/31 3.00 3.9 740 32.48 -21.7/50.04 -POOH 10-Aug 20870 9.3 47 12 20 7/8/8 -44/32/27/20/8/7 -7.44 69/31 3.10 4.03 750 32.74 -22.38/48.81 -Running in 5.5" Liner 11-Aug 20870 9.3 47 12 19 7/8/8 -43/31/26/19/8/7 -7.49 69/31 3.00 3.9 745 32.48 -21.7/50.04 -Prep for Displacement Casing Record Remarks 20" Conductor @ 160' MD, 160'TVD 13.375" Casing @ 3470' MD, 2450'TVD 9.625" Casing @ 12390' MD, 3507'TVD WELL NAME:LOCATION:Spy Island OPERATOR:AREA:North Slope MUD CO:STATE:Alaska RIG:SPUD:30-Jun-2013 SPERRY JOB:TD:6-Aug-2013 W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 2 110 1 Smith XR+ 6C Mill tooth 16"160'3484'3324'23.40 1.117 142.3 25 50 2250 900 2-1-WT-M-1-I-SD-TD Surface TD 3 200 2 Smith MDI816LVEBPX PDC 12.25"3485'9600'6115'43.20 0.960 141.7 15 180 2380 900 8-8-RO-Sh-X-1-BT-ROP POOH due to low ROP 4 300 3 Hycalog SKHI716D-E8C PDC 12.25"9600'12405'2805'12.30 0.969 227.7 10 180 2850 900 1-1-CT-G-X-In-No-TD Intermediate TD 5 400 4 Smith MdSi616EBPX PDC 8.75"12405'21813 9768'62.80 0.902 149.9 18 150 3800 550 0-0-CT-T-X-In-No-TD Production 8 700 5 Smith XR+ Mill tooth 8.75"11480'11620'140'2.50 0.746 56.9 10 40 2200 500 0-0-WT-A-E-In-No-BHA Mill Window for L1 9 800 6 Smith MdSi616EBPX PDC 8.75"11620'20870'9250'55.80 0.902 165.8 10 160 3400 550 1-1-WT-A-X-In-CT-TD Production L1 TD Alaska RIG:Doyon 15 SPUD:30-Jun-2013 WELL NAME:SP36-W5 & SP36-W5 L1 LOCATION:Spy Island OPERATOR:ENI Petroleum AREA:North Slope MUD CO: SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013 MI Swaco STATE: B i t R e c o r d . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 500.00 29-Jun-2013 24:00:00 Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 1 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: ConditionBit # 2.08.708.70 Size 160' Tools API FL WOB EVAMAR Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type Spud Mud 5.8052 Depth in / out YP (lb/100ft2) 9.60 CementCht Silt 24 hr Max Weight Hours Ss (ppb Eq) AK-AM-900480746 $2,810.00 $5,710.00 Clean conductor PV Footage Keener/Amend/Buchanan ShClyst TuffGvlCoal cP 49 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 0' 0' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 22.5130 MBT pH Siltst Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20" Cly * 24 hr Recap:Cont. R/U operations. R/U suitcases & test. P/U 5" DP. Perform 13-3/8" dummy hanger run. Rack back HWDP, jars 0 conductor @ 126'. 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 0Background (max) Trip Average 0 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 & NMDFC. Fill conductor & check for leaks. PSI test mud pumps. P/U conductor clean out BHA. Tag bottom @ 62'. Clean out 0 0 0'Minimum Depth C-5n 0' C-2 0 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 0 . 1 Smith XR+ 6C Milltooth 16" 1.117 160' Cly Set AtSize 178.9 X-65 Grade 20" 846 1352 Casing Summary Lithology (%) MBT 1151' pH Siltst SPP (psi) Gallons/stroke TFABit Type Depth 21.076 161.0 in Time: 160' 1151' 991' Max @ ft Current 472'335.5 Date: Avg to160' Yesterday's Depth: Current Depth: 24 Hour Progress: 1498.4 Flow In (gpm) Flow In (spm) (current) Keener/Amend/Buchanan ShClyst TuffGvlCoal cP 24 Footage Ss (ppb Eq) AK-AM- $2,810.00 $8,520.00 Drill Ahead 16" Hole PV 24 hr Max Weight Hours CementCht Silt YP (lb/100ft2) 9.40Spud Mud 5.078427 Depth in / out Mud Type Lst Type 9.44 Avg Min Comments RPM ECD (ppg) ml/30min Tools SP Motor 1.83, GyroPulse, Telescope 825, ARC 825 API FL WOB EVAMAR160' ConditionBit # 3.89.00 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Morning Report Report # 2 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 30-Jun-2013 24:00:00 Current Pump & Flow Data: 201 Max Chlorides mg/l 2100.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 2913 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 1396 545 Units* 0 0 0 0 C-5n 1056' C-2 52 2 744'Minimum Depth to 405' MD. Drill ahead to 1151' MD as of midnight. Max gas observed was 52 units @ 1056' MD. No samples collected during 13 Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 06Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 surface section. 0 Circ hole clean. POOH f/ 165' MD. P/U BHA #2 & shallow test tools. Drill ahead to 405' MD. BROOH to P/U BHA. RIH . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1500.00 1-Jul-2013 24:00:00 Current Pump & Flow Data: 1661 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 3 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.41 Doyon 15 Report For: ConditionBit # 5.09.40 Size 160' Tools SP Motor 1.83, GyroPulse, Telescope 825, ARC 825 API FL WOB EVAMAR 9.649.96 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type Spud Mud 5.42870'33 Depth in / out YP (lb/100ft2) 9.50 CementCht Silt 24 hr Max Weight Hours Ss (ppb Eq) AK-AM- $2,810.00 $11,330.00 Drill Ahead 16" Hole PV Footage Keener/Amend/Buchanan ShClyst TuffGvlCoal cP 30 (current) Avg to1151' Yesterday's Depth: Current Depth: 24 Hour Progress: 2408.9 Flow In (gpm) Flow In (spm) 1151' 3110' 1959' Max @ ft Current 3018'223.5 Date: Time: in 186.7 SPP (psi) Gallons/stroke TFABit Type Depth 23.589 MBT 3110' pH Siltst 816 193 Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20" Cly 1 Smith XR+ 6C Milltooth 16" 1.117 160' * 24 hr Recap:Drill ahead f/ 1151' MD to 3110' MD. Max gas observed the past 24 hrs was 1455 units @ 2238' MD. No samples 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 57Background (max) Trip Average 0 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 collected during surface section. 181 3 1615'Minimum Depth C-5n 2238' C-2 1455 0 0 0 Units* 02212 292 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 11670 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' Cly Set AtSize 178.9 X-65 Grade 20"Casing Summary Lithology (%) MBT 3484' pH Siltst SPP (psi) Gallons/stroke TFABit Type Depth 22.592 in Time: 3110' 3484' 374' Max @ ft Current 3464'134.8 Date: Avg to3110' Yesterday's Depth: Current Depth: 24 Hour Progress: 595.3 Flow In (gpm) Flow In (spm) (current) Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 29 Footage 3484' 3324' Ss (ppb Eq) AK-AM- $2,810.00 $14,140.00 R/U to run csg PV 24 hr Max Weight Hours CementCht Silt YP (lb/100ft2) 9.60Spud Mud 5.53484'37 Depth in / out Mud Type Lst Type 9.679.89 Avg Min Comments RPM ECD (ppg) ml/30min Tools SP Motor 1.83, GyroPulse, Telescope 825, ARC 825 API FL WOB EVAMAR160' ConditionBit # 5.09.40 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.09 Doyon 15 Report For: Morning Report Report # 4 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 2-Jul-2013 24:00:00 Current Pump & Flow Data: Max Chlorides mg/l 950.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 6040 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 4930 877 Units* 0 0 0 0 C-5n 3450' C-2 94 14 3166'Minimum Depth and 886 units while BROOH. No samples collected during surface section. 52 Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 886Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Drill ahead f/ 3110' MD to 3484' MD. BROOH. L/D BHA #2. R/U for csg. Max gas observed was 94 units @ 3450' MD . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 3-Jul-2013 24:00:00 Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 5 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: ConditionBit # 9.30 Size 160' Tools API FL WOB EVAMAR Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type Spud Mud3484'12 Depth in / out YP (lb/100ft2) 8.00 CementCht Silt 24 hr Max Weight Hours Ss (ppb Eq) AK-AM- $2,810.00 $16,950.00 Cement PV Footage 3484' 3324' Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 23 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 3484' 3484' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 44 MBT pH Siltst Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20" Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:R/U csg equip. RIH to 315' MD & M/U shoe track. RIH 13-3/8" csg to 3470' MD. Circ & cond mud. Cement. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max) Trip Average 118 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 0 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' Cly Set AtSize 178.9 X-65 Grade 20"Casing Summary Lithology (%) MBT pH Siltst SPP (psi) Gallons/stroke TFABit Type Depth 35 in Time: 3484' 3484' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) (current) Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 22 Footage 3484' 3324' Ss (ppb Eq) AK-AM- $2,810.00 $19,760.00 P/U 5" DP PV 24 hr Max Weight Hours CementCht Silt YP (lb/100ft2) 9.30Spud Mud3484'9 Depth in / out Mud Type Lst Type Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL WOB EVAMAR160' ConditionBit # 9.10 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Morning Report Report # 6 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 4-Jul-2013 24:00:00 Current Pump & Flow Data: Max Chlorides mg/l Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 0 0 Units* 0 0 0 0 C-5nC-2 Minimum Depth 5" DP. Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont. cement. R/D cement equip & L/D landing jt. N/D diverter stack. N/U BOP stack. Set test plug & test BOP. P/U . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 300.00 5-Jul-2013 24:00:00 Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 7 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: ConditionBit # 2 4.0 12.25"Smith MDI816LVEBPX PDC 9.30 Size 3470' 160' Tools Xceed 900, TeleScope 825, ARC 825 API FL 3484' WOB EVAMAR Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type Spud Mud 6.43484'20 Depth in / out YP (lb/100ft2) 9.70 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM- $2,810.00 $22,570.00 RIH PV Footage 3484' 3324' Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 9 (current) Avg to3484' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 3484' 3484' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 50 L-80 MBT 3484' pH 0.960 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Test BOP. Cont. P/U 5" DP. P/U BHA #3. RIH w/ BHA #3 and test tools. Cont. RIH. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max) Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 0 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' BTC Cly Set AtSize 178.9 X-65 Grade 20" 5 13 3/8" 850 201 Casing Summary Lithology (%) L-80 MBT 4640' pH 0.960 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2.549 269.3 in Time: 3484' 4640' 1156' Max @ ft Current 3502'260.3 Date: Avg to3484' Yesterday's Depth: Current Depth: 24 Hour Progress: 727.3 Flow In (gpm) Flow In (spm) (current) Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 10 Footage 3484' 3324' Ss (ppb Eq) AK-AM- $3,410.00 $25,980.00 Drill 12.25" Hole PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.90LSND6.24150'26 Depth in / out Mud Type Lst 95 Type 9.519.85 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL 3484' WOB EVAMAR 3470' 160' ConditionBit # 2 4.0 12.25" 9.30 Smith MDI816LVEBPX PDC 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.06 Doyon 15 Report For: Morning Report Report # 8 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 6-Jul-2013 24:00:00 Current Pump & Flow Data: 1561 Max Chlorides mg/l 700.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 38067 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 4443 32 Units* 0 0 0 0 C-5n 3713' C-2 286 3 3485'Minimum Depth min. Drill shoe track & rat hole to 3484' MD. Drill 20' new hole to 3504' MD. Displace mud to LSND. Cut & slip drill line. Perform 41 Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 15Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 mainly of sandstone with local silts. LOT to 11.16 ppg EMW. Drill ahead from 3504' MD to 4640' MD. Max gas observed was 286 units @ 3713' MD. Cuttings consist 0 Cont. RIH to 3242' MD. Wash down to top of cmt plug @ 3382' MD & Circ B/U. Test 13-3/8" csg to 2500 psi for 30 . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1400.00 7-Jul-2013 24:00:00 Current Pump & Flow Data: 2253 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.71 Doyon 15 Report For: ConditionBit # 2 5.5 12.25"Smith MDI816LVEBPX PDC 9.30 Size 3470' 160' Tools Xceed 900, TeleScope 825, ARC 825 API FL 3484' WOB EVAMAR 9.9810.33 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 95 Type LSND 5.07320'35 Depth in / out YP (lb/100ft2) 9.70 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM- $3,410.00 $29,390.00 Drill 12.25" Hole PV Footage 3484' 3324' Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 15 (current) Avg to4640' Yesterday's Depth: Current Depth: 24 Hour Progress: 666.6 Flow In (gpm) Flow In (spm) 4640' 7910' 3270' Max @ ft Current 4963'275.2 Date: Time: in 227.7 SPP (psi) Gallons/stroke TFABit Type Depth 17.559 L-80 MBT 7910' pH 0.960 Siltst 13 3/8" 901 213 Casing Summary Lithology (%) 5 Set AtSize 178.9 X-65 Grade 20" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Drill ahead f/ 4640' MD to 7910' MD as of midnight. Max gas observed the past 24 hrs was 117 units @ 4994' MD. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 4Background (max) Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 Cuttings have consisted of mostly sandstone with local silts and some coal ctgs around 4900' MD - 5000' MD. 12 2 6425'Minimum Depth C-5n 4994' C-2 117 0 0 0 Units* 01242 10 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 14666 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' BTC Cly Set AtSize 178.9 X-65 Grade 20" 13 3/8" 905 214 Casing Summary Lithology (%) L-80 MBT 9400' pH 0.960 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 17.551 227.7 in Time: 7910' 9400' 1490' Max @ ft Current 4963'209.6 Date: Avg to7910' Yesterday's Depth: Current Depth: 24 Hour Progress: 408.7 Flow In (gpm) Flow In (spm) (current) Perry/Amend/Buchanan ShClyst TuffGvlCoal cP 12 Footage 3484' 3324' Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $32,800.00 Drill 12.25" Hole PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.50LSND5.39295'27 Depth in / out Mud Type Lst 100 Type 10.1110.37 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, TeleScope 825, ARC 825 API FL 3484' WOB EVAMAR 3470' 160' ConditionBit # 2 5.0 12.25" 9.30 Smith MDI816LVEBPX PDC 9.30 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.68 Doyon 15 Report For: Morning Report Report # 10 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 8-Jul-2013 24:00:00 Current Pump & Flow Data: 2433 Max Chlorides mg/l 1700.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 4504 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 424 21 Units* 0 0 0 0 C-5n 8815' C-2 41 2 9277'Minimum Depth sandstone. 8 Gas Summary 0 0 0 C-1 C-5i 5 C-3 00 C-4i C-4n 000Average 2Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Drill ahead f/ 7910' MD to 9400' MD. Max gas observed was 41 units @ 9915' MD. Samples consist of mainly clean . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1700.00 9-Jul-2013 24:00:00 Current Pump & Flow Data: 1503 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 11 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.38 Doyon 15 Report For: ConditionBit # 2 6.0 12.25"Smith MDI816LVEBPX PDC 9.35 Size 3470' 160' Tools Xceed 900, TeleScope 825, ARC 825 API FL 3484' WOB EVAMAR 10.0710.30 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 95 Type LSND 5.19599'32 Depth in / out YP (lb/100ft2) 9.60 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $36,210.00 BROOH PV Footage 3484' 3324' Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 16 (current) Avg to9400' Yesterday's Depth: Current Depth: 24 Hour Progress: 269.4 Flow In (gpm) Flow In (spm) 9400' 9599' 199' Max @ ft Current 9513'104.6 Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 22.562 L-80 MBT 9599' pH 0.960 Siltst 13 3/8" 787 186 Casing Summary Lithology (%) 5 Set AtSize 178.9 X-65 Grade 20" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Drill ahead f/ 9400' MD to 9599' MD. BROOH due to low ROP. Max gas observed was 29 units @ 9404' MD. Samples 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) 5Background (max) Trip Average 19 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 consisty of mainly clean sandstone. Metal shavings seen in cutting samples. 10 5 9599'Minimum Depth C-5n 9404' C-2 29 0 0 0 Units* 0746 326 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 2489 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' BTC Cly Set AtSize 178.9 X-65 Grade 20" 13 3/8" 207 48 Casing Summary Lithology (%) L-80 MBT 9599' pH 0.960 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 22.556 in Time: 9599' 9599' 0' Max @ ft Current Date: Avg to9599' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) (current) Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 17 6115' 12.25" 0.969 Footage 43.20 3484' 3324' Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $39,620.00 RIH PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.60 180.0 Hycalog SKHI716D-E8C PDC LSND 5.3 9599' 9599'26 Depth in / out Mud Type Lst Type Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, PowerPulse 825, ARC 825 API FL 15.03484' 3599' WOB EVAMAR 3 3470' 160' Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 6.0 12.25"Smith MDI816LVEBPX PDC 9.20 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 10-Jul-2013 24:00:00 Current Pump & Flow Data: 314 Max Chlorides mg/l 1450.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 0 0 Units* 0 0 0 0 C-5nC-2 Minimum Depth Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average 48Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont. BROOH. L/D BHA #3. P/U BHA #4. RIH. . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1600.00 11-Jul-2013 24:00:00 Current Pump & Flow Data: 2597 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.96 Doyon 15 Report For: Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 8.0 12.25"Smith MDI816LVEBPX PDC 9.50 Size 3 3470' 160' Tools Xceed 900, PowerPulse 825, ARC 825 API FL 15.03484' 3599' WOB EVAMAR 10.0510.48 Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst 45 Type 180.0 Hycalog SKHI716D-E8C PDC LSND 5.2 9599' 11679'32 Depth in / out YP (lb/100ft2) 9.50 CementCht Silt 24 hr Max 68.0 Weight Hours 5 Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $43,030.00 Drill 12.25" Hole PV 6115' 12.25" 0.969 Footage 43.20 3484' 3324' Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 18 (current) Avg to9599' Yesterday's Depth: Current Depth: 24 Hour Progress: 383.1 Flow In (gpm) Flow In (spm) 9599' 12015' 2416' Max @ ft Current 9845'257.8 Date: Time: in 214.5 SPP (psi) Gallons/stroke TFABit Type Depth 22.562 L-80 MBT 12015' pH 0.960 Siltst 13 3/8" 854 202 Casing Summary Lithology (%) 50 Set AtSize 178.9 X-65 Grade 20" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Cont. wash & ream to 9599' MD. Drill ahead from 9599' MD to 12015' MD. Max gas observed the past 24 hours was 111 siltstone with some sand and 5-10% shale fragments from 11550' - 12000' MD. 100% Gas In Air=10,000 UnitsConnection 463 Chromatograph (ppm) 48Background (max) Trip Average 8 082188 00 C-4i C-4n 119 C-3C-1 C-5i Gas Summary 0 213 566 525 units @ 11361' MD. Samples consist of mainly clean sandstone with some silt from 9599' MD - 11500' MD and mainly 90 8 9679'Minimum Depth C-5n 11361' C-2 525 0 550 0 Units* 1347500 946 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 839 0 52325 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' BTC Cly Set AtSize 178.9 X-65 Grade 20" 80 13 3/8" 905 214 Casing Summary Lithology (%) L-80 MBT 12405' pH 0.960 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 23.052 in Time: 12015' 12405' 390' Max @ ft Current 12202'196.2 Date: Avg to12015' Yesterday's Depth: Current Depth: 24 Hour Progress: 297.4 Flow In (gpm) Flow In (spm) (current) Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 13 6115' 12.25" 0.969 Footage 43.20 3484' 3324' Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $46,440.00 BROOH PV 24 hr Max 68.0 Weight Hours 10 CementCht Silt YP (lb/100ft2) 9.60 180.0 Hycalog SKHI716D-E8C PDC LSND 5.2 9599' 12405 25 Depth in / out Mud Type Lst 10 Type 10.7210.86 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 900, PowerPulse 825, ARC 825 API FL 15.03484' 3599' WOB EVAMAR 3 3470' 160' Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 8.0 12.25"Smith MDI816LVEBPX PDC 9.45 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: 10.97 Doyon 15 Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Depth 12-Jul-2013 24:00:00 Current Pump & Flow Data: 1990 Max Chlorides mg/l 1400.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 59 0 6617 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 3126 51 Units* 27 0 40 0 C-5n 12333' C-2 70 3 12028'Minimum Depth Samples consist of mainly siltstone with some sand and shale. 38 Gas Summary 0 40 60 C-1 C-5i 31 C-3 00 C-4i C-4n 02445Average 8119Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 51 29 Drill ahead f/ 12015' MD to 12405' MD. Max gas observed was 70 units @ 12333' MD and 81 units while BROOH. . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 1100.00 13-Jul-2013 24:00:00 Current Pump & Flow Data: Max 1-1-CT-G-X-In-No-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 15 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 8.0 12.25"Smith MDI816LVEBPX PDC 9.40 Size 3 3470' 160' Tools API FL 10 15.03484' 3599' WOB EVAMAR Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Type 180 180.0 Hycalog SKHI716D-E8C PDC LSND 5.2 9599' 12405'25 12405' Depth in / out YP (lb/100ft2) 9.70 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $49,850.00 R/U Csg Equip PV 6115' 12.25" 0.969 Footage 12.30 2806' 43.20 3484' 3324' Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 12 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12405' 12405' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 21.049 L-80 MBT pH 0.960 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade 20" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Cont. BROOH. L/D BHA #4. Test rams. R/U csg equip. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max) Trip Average 26 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 0 . 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' BTC Cly Set AtSize 178.9 X-65 Grade L-8012390' 20" 9 5/8" 13 3/8" Casing Summary Lithology (%) L-80 MBT pH 0.960 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 20.064 in Time: 12405' 12405' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 (current) Perry/Wimmer/Buchanan ShClyst TuffGvlCoal cP 16 6115' 12.25" 0.969 Footage 12.30 2806' 43.20 3484' 3324' Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $53,260.00 Fill 9-5/8" Csg PV 24 hr Max 68.0 Weight Hours CementCht Silt YP (lb/100ft2) 9.50 180 180.0 Hycalog SKHI716D-E8C PDC LSND 5.0 9599' 12405'23 12405' Depth in / out Mud Type Lst Hydril Type Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL 10 15.03484' 3599' WOB EVAMAR 3 3470' 160' Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 89 5 12.25"Smith MDI816LVEBPX PDC 9.50 Size Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope 1-1-CT-G-X-In-No-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 14-Jul-2013 24:00:00 Current Pump & Flow Data: Max Chlorides mg/l 1100.00 Density (ppg) out (sec/qt) Viscosity Cor Solids % * 24 hr Recap: (max)(current) 0 0 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey 0 0 Units* 0 0 0 0 C-5nC-2 Minimum Depth equip. Fill csg. Gas Summary 0 0 0 C-1 C-5i 0 C-3 00 C-4i C-4n 000Average Background (max) Trip Chromatograph (ppm) 100% Gas In Air=10,000 UnitsConnection 0 0 Cont R/U csg equip. M/U shoe track to 165' MD. RIH 9-5/8" csg. M/U landing jt & land csg @ 12390' MD. R/D csg . Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 900.00 15-Jul-2013 24:00:00 Current Pump & Flow Data: Max 1-1-CT-G-X-In-No-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Condition 8-8-RO-Sh-X-1-BT-ROP Bit # 2 7.5 12.25"Smith MDI816LVEBPX PDC 9.40 Size 3 3470' 160' Tools API FL 10 15.03484' 3599' WOB EVAMAR Avg Min Comments RPM ECD (ppg) ml/30minMud Type Lst Hydril Type 180 180.0 Hycalog SKHI716D-E8C PDC LSND 5.3 9599' 12405'14 12405' Depth in / out YP (lb/100ft2) 9.10 CementCht Silt 24 hr Max 68.0 Weight Hours Ss (ppb Eq) AK-AM-0900577139 $3,410.00 $56,670.00 Prep csg cut PV 6115' 12.25" 0.969 Footage 12.30 2806' 43.20 3484' 3324' Keener/Wimmer/Buchanan ShClyst TuffGvlCoal cP 10 40.0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12405' 12405' 0' Max @ ft Current Date: Time: in SPP (psi) Gallons/stroke TFABit Type Depth 15.044 L-80 MBT pH 0.960 Siltst 13 3/8" Casing Summary Lithology (%) Set AtSize 178.9 X-65 Grade L-8012390' 20" 9 5/8" BTC Cly 25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160' * 24 hr Recap:Cont. fill 9-5/8" csg. R/U cmt equip & cmt csg. R/D cmt equip. 0 100% Gas In Air=10,000 UnitsConnection 0 Chromatograph (ppm) Background (max) Trip Average 000 00 C-4i C-4n 0 C-3C-1 C-5i Gas Summary 0 0 0 Minimum Depth C-5nC-2 0 0 0 Units* 00 0 907-685-0772Unit Phone: 0 Leigh Ann Rasher Maximum Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey (max)(current) 0 0 0 . * 24 hr Recap: 2 Smith MDI816LVEBPX PDC 12.25 0.960 43.20 3484' (max)(current) BTC 0 0 Cly 0 Set AtSize 178.9 X-65 Grade L-8012390' 20" 9 5/8" 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik / Clifton Posey 0 0 13 3/8" Units* Casing Summary Lithology (%) 0 L-80 MBT pH 0.960 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 15.044 C-5nC-2 in Minimum Depth Time: R/U and test BOPs at time of report. 12405' 12405' 0' Max @ ft Current Date: Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 40.0 Gas Summary 0 0 0 (current) ShClyst TuffGvlCoal 12.30 3599' 6115' Keener/Wimmer cP 11 15.0 Ss (ppb Eq) C-1 C-5i AK-AM-0900577139 $4,410.00 $61,080.00 Testing BOPs PV 2806' 24 hr Max 68.0 Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 9.10 000 LSND 5.31240513 Depth in / out Mud Type Lst Hydril Type Average Background (max) Trip Avg Min Comments RPM ECD (ppg) ml/30min Chromatograph (ppm) 109599' 12405' WOB EVAMAR 180 Footage 100% Gas In Air=10,000 UnitsConnection 0 3470' 160' Condition 1-1-CT-G-X-IN-NO-TD Bit # 3 7.5 12.25Hycalog SKH17-E8C PDC 9.40 Size 180.0 8-8-RO-SH-X-1-BT-ROP Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: Morning Report Report # 18 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope ROP ROP (ft/hr) 4.23 @ Mud Data Tools API FL Depth 0 Chlorides 16-Jul-2013 24:00:00 Current Pump & Flow Data: Max mg/l 900.00 N/U BOP equipment test packoff. Set test plug and test body. P/U 4.5" drill pipe. Cut and slip, service draw works. Density (ppg) out (sec/qt) Viscosity Cor Solids % . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity Cor Solids %mg/l Chlorides 17-Jul-2013 24:00:00 Current Pump & Flow Data: Max Depth ROP ROP (ft/hr) 4.23 @ Mud Data Tools API FL Morning Report Report # 19 Customer: Well: Area: Location: Rig: SP36-W5 ENI Petroleum Spy Island North Slope Job No.: Daily Charges: Total Charges: MWD Summary 0.96 Rig Activity: Doyon 15 Report For: 12.25Hycalog SKH17-E8C PDC 9.30 Size 180.0 8-8-RO-SH-X-1-BT-ROP 0 3470' 160' Condition 1-1-CT-G-X-IN-NO-TD Bit # 3 to Faze Pro OBM. Completed BOP test. P/U BHA #5 and 8.75" PDC bit. RIH to 1213' MD and shallow test. Continue to RIH. Ream in Footage 100% Gas In Air=10,000 UnitsConnection 0 Avg Min Comments RPM ECD (ppg) ml/30min 10 Background (max) Trip Average Mud Type Lst Hydril Type Chromatograph (ppm) LSND12405 18 Depth in / out 9599' 12405' WOB EVAMAR 000 180 00 CementChtSilt C-4i C-4n 24 hr Max 68.0 Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0900577139 $3,410.00 $64,490.00 RIH PV 12.30 3599' 6115' Keener/Wimmer cP 9 15.0 2806' YP (lb/100ft2) ShClyst TuffGvlCoal 40.0 Gas Summary 0 0 0 (current) Avg to Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) 12405' 12405' 0' Max @ ft Current Date: Time: the hole at 40 rpm to 12188' MD. Wash and ream to 12281' MD. Casing test to 3000 psi for 30 minutes. Prep to displace LSND in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 15.050 L-80 MBT pH 0.960 0 0 0 Siltst 13 3/8" Units* Casing Summary Lithology (%) 00 0 907-685-0772Unit Phone: 0 Paul Kalenuik Maximum Report By:Logging Engineers:Paul Kalenuik / Clifton Posey Set AtSize 178.9 X-65 Grade L-8012390' 20" 9 5/8" (max)(current) BTC 0 0 Cly 0 2 Smith MDI816LVEBPX PDC 12.25 0.960 43.20 3484' . . * 24 hr Recap: 3.58 6.6 Displace to Faze Pro OBM. Drill shoe track cement to shoe and 20 new feet of hole to 12425' MD. Drill 8.75" Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Clifton Posey (max)(current) BTC Cly L-80 40.0 Depth in / out L-8012390' Bit Type RPM 12405' 180 180.0 Unit Phone: 106 Paul Kalenuik Set AtSize 178.9 X-65 Grade 0 0 C-2 Gas Summary 46110 154 400 0 343 149095 Gallons/stroke 0 1305 12509'Minimum Depth 13 3/8" Maximum in 20 13455' 0 456 197 production hole with tappered drill string. 546 Date: Time: 529 Alkal Coal 0 12405' 13772' 1367 Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 13175'321.0238.0 Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 0.960 1647 6115' 12.25 0.960 Footage Sh AK-AM-0900577139 3410 67900 Drilling Ahead PV cP 68.0 Weight Flow In (gpm) 432 Size Hours 7 Cement C-1 C-5i C-3 Chromatograph (ppm) 1312 1013 35158 C-4i C-4n 66 9599' 12.30 2806' 43.20 65/35 10 15.0 Lst 100 Hydril (lb/100ft2) 9.35 Type 14 Hycalog SKH17-E8C PDC Mud (lb/bbl)ml/30min 2.75 (max) Average Comments 49Background Trip 100% Gas In Air=10,000 UnitsConnection 1-1-CT-G-X-IN-NO-TD3 3470' Condition 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB Smith MDI816LVEBPX PDC TFA MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 13419 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 379.0 Morning Report Report # 20 Customer: Well: Area: Location: Rig: SP36-W5L1 18-Jul-2013 24:00:00 Yesterday's Depth: 3065 ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 3265 ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Morning Report Report # 21 Customer: Well: Area: Location: Rig: SP36-W5 19-Jul-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 456.0 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 15931 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth Flow In (spm) EVAMAR 3599' WOB Smith MDI816LVEBPX PDC TFA 3470' Condition 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160' 1-1-CT-G-X-IN-NO-TD3 Trip 100% Gas In Air=10,000 UnitsConnection Average 104Background Mud (lb/bbl)ml/30min 2.20 (max) Comments (lb/100ft2) 9.30 Type 17 Hycalog SKH17-E8C PDC 2806' 43.20 66/34 10 15.0 Lst 100 Hydril 90294 C-4i C-4n 157 C-3 Chromatograph (ppm) 1477 1169 574 Size Hours 7 Cement C-1 C-5i Sh AK-AM-0900577139 $3,410.00 $71,310.00 Drilling Ahead PV cP 68.0 Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 0.960 1546 6115' 12.25 0.960 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 14052'113.0334.0 0 13772' 16137' 2365' Lime TuffGvl C-5n Date: Time: 541 Alkal Coal 671 14940' 0 626 302 Minimum Depth 13 3/8" Maximum in 8 Gallons/stroke 0 57990 243 537 0 480 216811 32 C-2 Gas Summary 1989 907-685-0772Unit Phone: 169 Paul Kalenuik Set AtSize 178.9 X-65 Grade Depth in / out L-8012390' Bit Type RPM 12405' 180 180.0 9599' 12.30 (current) BTC Cly L-80 40.0 0 2.86 78.2 Drill 8.75" production run to a depth of 16137' MD as of midnight. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Clifton Posey (max) . . * 24 hr Recap: 4.03 6.9 Drill 8.75" production run to a depth of 18629' MD as of midnight. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Clifton Posey (max) Cly L-80 40.0 0 L-8012390' Bit Type RPM 12405' 180 180.0 9599' 12.30 BTC Set AtSize 178.9 X-65 Grade Depth in / out 907-685-0772Unit Phone: 190 Paul Kalenuik (current) C-2 Gas Summary 1217 47309 274 564 0 567 127611 Gallons/stroke 0Minimum Depth 13 3/8" Maximum in 17 18390' 0 694 331 27 582 Date: Time: 550 Alkal Coal 0 16137' 18629' 2492' Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 17420'105.0301.0 Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 0.960 1647 6115' 12.25 0.960 Footage Sh AK-AM-0900577139 $4,410.00 $75,720.00 Drilling Ahead PV cP 68.0 Weight Flow In (gpm) 605 Size Hours 7 Cement C-1 C-5i Chromatograph (ppm) 1432 1287 115354 C-4i C-4n 194 10 15.0 Lst 100 Hydril C-3 (lb/100ft2) 9.30 Type 16 Hycalog SKH17-E8C PDC Mud (lb/bbl)ml/30min 3.10 (max) Comments Average 22Background Trip 100% Gas In Air=10,000 UnitsConnection 1-1-CT-G-X-IN-NO-TD3 3470' Condition 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB Smith MDI816LVEBPX PDC TFA 2806' 43.20 66/34 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 18250 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 450.0 Morning Report Report # 22 Customer: Well: Area: Location: Rig: SP36-W5 20-Jul-2013 24:00:00 Yesterday's Depth: 3665 ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity . . 3 * 24 hr Recap: Report By: 20" 9 5/8" Logging Engineers:A.Paul kalenuik/ Clifton Posey (max)(current) BTC Cly L-80 40.0 Depth in / out L-8012390' Bit Type RPM 3599' 180.0 50.0 Unit Phone: 155 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade 0 10 38 C-2 Gas Summary 41726 220 482 0 439 117390 Gallons/stroke 0 1095 Minimum Depth 13 3/8" Maximum in 19 19130' 0 564 283 Drill 8.75" production run to a depth of 19,843''MD as of midnight. No issues to report. Monitoring well volumes and tracking gas. 569 Date: Time: 546 Alkal Coal 0 18629' 19843' 1214' Lime TuffGvl C-5n 24 Hour Progress: SPP (psi) Max @ ft Current 19472'105.0345.0 Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 1.117 1645 3324' 12.25"0.960 Footage Sh AK-AM-0900577139 $3,410.00 $79,130.00 Drilling Ahead PV cP 68.0 Weight Flow In (gpm) 518 Size Hours 0 Cement C-1 C-5i C-3 Chromatograph (ppm) 1340 1045 91275 C-4i C-4n 158 3484' 43.20 6115' 23.40 37/33 15.0 25.0 Lst 90 Hydril (lb/100ft2) 9.30 Type 15 Smith MDI816LVEBPX PDC Mud (lb/bbl)ml/30min 4.163.20 (max) Average Comments 24Background Trip 100% Gas In Air=10,000 UnitsConnection 8-8-RO-Sh-X-1-BT-ROP2 3470' Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 160'EVAMAR 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 19651 7.1 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 437.0 Morning Report Report # 23 Customer: Well: Area: Location: Rig: SP36-W5 07/21/2013 24:00:00 Yesterday's Depth: 3716 ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Density (ppg) out (sec/qt) Viscosity 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Morning Report Report # 24 Customer: Well: Area: Location: Rig: SP36-W5 22-Jul-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 495.0 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 66/34 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB 3 3470' 2806' Trip 100% Gas In Air=10,000 UnitsConnection Average 59Background Mud (lb/bbl)ml/30min 1.90 (max) Comments 1-1-CT-G-X-IN-NO-TD Condition Lst 100 Hydril C-3 40137 C-4i C-4n 90 7 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 313 Size Hours 1158 686 10 AK-AM-0900577139 $3,410.00 $82,540.00 BROOH PV cP (lb/100ft2) Flow In (spm) 1649 6115' 12.25 0.960 Footage 19 TFA 43.20 ClystSsChtSiltSiltst Sh Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.960 9.30 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 19759'79.8 0 19843' 21813' 1970' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 402 221 27 back reaming were 12 barrles at the time of report. Encountered fault at 19980' MD. Well bore breathing observed. 357 Minimum Depth 13 3/8" Maximum in 19 Gallons/stroke 0 123 386 0 186 C-2 Gas Summary 1036 11308219904' 907-685-0772Unit Phone: 98 Paul Kalenuik (current) 21240 Set AtSize 178.9 X-65 Grade Depth in / out 15.0 Type Hycalog SKH17-E8C PDC Smith MDI816LVEBPX PDC Bit Type RPM 12405' 180 180.0 9599' 12.30 Cly L-80 40.0 0 L-8012390' BTC 2.70 7.4 Drill 8.75" hole to a TD of 21813' MD. Circulate bottoms up and then proceeded to BROOH to 21600' MD. Loss from Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Clifton Posey (max) . . 3 * 24 hr Recap: Report By: 20" 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) BTC Cly L-80 40.0 Depth in / out L-8012390' Bit Type RPM 3599' 180.0 50.0 Unit Phone:A.Paul Kalenuik Set AtSize 178.9 X-65 Grade C-2 Gas Summary Gallons/stroke Minimum Depth 13 3/8" Maximum in BROOH from 21,813' MD to 11,729' MD. Date: Time: 550 Alkal Coal 21813' 21813' 0' Lime TuffGvl C-5n 24 Hour Progress: SPP (psi) Max @ ft Current Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 1.117 1749 3324' 12.25"0.960 Footage Sh AK-AM-0900577139 $3410.00 $85950.00 BROOH PV cP 68.0 Weight Flow In (gpm) Size Hours Cement C-1 C-5i C-3 Chromatograph (ppm) C-4i C-4n 3484' 43.20 6115' 23.40 66/34 15.0 25.0 Lst 100 Hydril (lb/100ft2) 9.30 Type 15 Smith MDI816LVEBPX PDC Mud (lb/bbl)ml/30min 2.471.90 (max) Average Comments Background Trip 100% Gas In Air=10,000 UnitsConnection 8-8-RO-Sh-X-1-BT-ROP2 Well bore breathing observed. 3470' Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 160'EVAMAR 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 7.3 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 25 Customer: Well: Area: Location: Rig: SP36-W5 07/23/2013 24:00:00 Yesterday's Depth: 3680 ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Density (ppg) out (sec/qt) Viscosity 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 . . 3 * 24 hr Recap: 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Morning Report Report # 26 Customer: Well: Area: Location: Rig: SP36-W5 07/24/2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 7.3 MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm) 160'EVAMAR 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 8-8-RO-Sh-X-1-BT-ROP2 Cut & slip drill line. 3470' 100% Gas In Air=10,000 Units0Connection Comments 0Background Trip (max) Average 0 Mud (lb/bbl)ml/30min 2.602.00 Lst 100 Hydril (lb/100ft2) 9.30 Type 15 Smith MDI816LVEBPX PDC 3484' 43.20 6115' 23.40 66/34 15.0 25.0 00 C-4i C-4n 0 C-3 Chromatograph (ppm) 0 0 0 Size Hours 0 Cement C-1 C-5i Sh AK-AM-0900577139 $3410.00 $89,360.00 R/U 5.5" Liner Equip PV cP 68.0 Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 1.117 1750 3324' 12.25"0.960 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' 24 Hour Progress: SPP (psi) Max @ ft Current 0 21813' 21813' 0' Lime TuffGvl C-5n Date: Time: 0 Alkal Coal BROOH f/12250' MD to 10662' at 514 gpm. No losses noted. 0 0 0' 0 0 00 0'Minimum Depth 13 3/8" Maximum in Gallons/stroke 0 0 0 0 0 0 0 0 0 C-2 Gas Summary Unit Phone: 0 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade L-80 40.0 Depth in / out L-8012390' Bit Type RPM 3599' 180.0 50.0 Report By: 20" 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) BTC Cly . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Morning Report Report # 27 Customer: Well: Area: Location: Rig: SP36-W5 25-Jul-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 66/34 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB 3 3470' 2806' Trip 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 2.40 (max) Comments 1-1-CT-G-X-IN-NO-TD Condition Lst Hydril C-3 Clyst 00 C-4i C-4n 0 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 10 AK-AM-0900577139 $3,410.00 $92,770.00 Run 5.5" Liner PV cP (lb/100ft2) Flow In (spm) 1550 6115' 12.25 0.960 Footage 19 TFA 43.20 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.960 9.30 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 0 21813' 21813' 0' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 0 0 0Minimum Depth 13 3/8" Maximum in Gallons/stroke 0 0 0 0 0 C-2 Gas Summary 0 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 0 Set AtSize 178.9 X-65 Grade Depth in / out 15.0 Type Hycalog SKH17-E8C PDC Smith MDI816LVEBPX PDC Bit Type RPM 12405' 180 180.0 9599' 12.30 L-80 40.0 0 L-8012390' BTC 3.12 7.4 Running in 5.5" liner before performing production casing operations. RIH with 5" DP to 12348' MD. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . 3 * 24 hr Recap: 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Morning Report Report # 28 Customer: Well: Area: Location: Rig: SP36-W5 07/26/2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 7.5 MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm) 160'EVAMAR 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 8-8-RO-Sh-X-1-BT-ROP2 Liner top at 11503'. POH to 11310'. R/U & repair top drive. 3470' 100% Gas In Air=10,000 Units0Connection Comments 0Background Trip (max) Average 0 Mud (lb/bbl)ml/30min 3.382.60 Lst 100 Hydril (lb/100ft2) 9.30 Type 16 Smith MDI816LVEBPX PDC 3484' 43.20 6115' 23.40 66/34 15.0 25.0 00 C-4i C-4n 0 C-3 Chromatograph (ppm) 0 0 0 Size Hours 0 Cement C-1 C-5i Sh AK-AM-0900577139 $3,410.00 $96,180.00 Repairing Top Drive PV cP 68.0 Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 1.117 1650 3324' 12.25"0.960 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' 24 Hour Progress: SPP (psi) Max @ ft Current 0 21813' 21813' 0' Lime TuffGvl C-5n Date: Time: 0 Alkal Coal RIH f/16925' to 17859'. Monitor top drive rotating link assembly leak. RIH to set 5.5" liner at 21130'. 0 0 0' 0 0 00 0'Minimum Depth 13 3/8" Maximum in Gallons/stroke 0 0 0 0 0 0 0 0 0 C-2 Gas Summary Unit Phone: 0 A.Paul Kalenuik Set AtSize 178.9 X-65 Grade L-80 40.0 Depth in / out L-8012390' Bit Type RPM 3599' 180.0 50.0 Report By: 20" 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) BTC Cly . . * 24 hr Recap: 3.12 7.6 Complete work on top drive. POOH. Perform rig maintenance. Lay down running tool. Cut and slip drill line. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 12405' 180 180.0 9599' 12.30 Set AtSize 178.9 X-65 Grade Depth in / out 15.0 Type Hycalog SKH17-E8C PDC Smith MDI816LVEBPX PDC 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 0 C-2 Gas Summary 0 0 0 0 0 Gallons/stroke 0Minimum Depth 13 3/8" Maximum in 0 0 0 0 PJSM rig up Halliburton wireline. Moisture related interferance with like and tools. Date: Time: Oil / Water API FL Alkal Coal ECD (ppg) Tools 0 21813' 21813' 0' Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.960 9.30 Ss Cht Silt Siltst ShCly 1650 6115' 12.25 0.960 Footage 16 TFA 43.20 AK-AM-0900577139 $3,410.00 $99,590.00 Prep Wireline ops PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 10 0 Cement C-1 C-5i Chromatograph (ppm) 00 C-4i C-4n 0 Lst Hydril C-3 Clyst Mud (lb/bbl)ml/30min 2.40 (max) Comments 1-1-CT-G-X-IN-NO-TD Condition Average Background Trip 100% Gas In Air=10,000 UnitsConnection 3 3470' 2806' 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB 66/34 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 29 Customer: Well: Area: Location: Rig: SP36-W5 27-Jul-2013 24:00:00 Yesterday's Depth: ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity . . 3 * 24 hr Recap: 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Morning Report Report # 30 Customer: Well: Area: Location: Rig: SP36-W5L1 07/28/2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 7.6 MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm) 12390'Hydril 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 8-8-RO-Sh-X-1-BT-ROP2 report time. Currently POOH from clean out line. RIH w/Baker bullnose, 2 junk baskets, magnet & mill to 9862'. RIH. Tag TOL at 11503'. At 11502', circ at 10 bpm & 1240 psi at f/CCL. L/D, R/D & changeout wireline units. 21813' 100% Gas In Air=10,000 Units0Connection Comments 0Background Trip (max) Average 0 Mud (lb/bbl)ml/30min 2.732.10 Lst 100 (lb/100ft2) 9.30 Type 17 Smith MDI816LVEBPX PDC 3484' 43.20 6115' 23.40 66/34 15.0 25.0 00 C-4i C-4n 0 C-3 Chromatograph (ppm) 0 0 0 Size Hours 0 Cement C-1 C-5i Sh AK-AM-0900577139 $3,410.00 $103,000.00 POOH PV cP Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 1.117 1650 3324' 12.25"0.960 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' 24 Hour Progress: SPP (psi) Max @ ft Current 0 21813' 21813' 0' Lime TuffGvl C-5n Date: Time: 0 Alkal Coal PJSM. R/U wireline equip. RIH w/junk basket, CCL, 6.45" gauge ring & tractor to 6400'. Unable to reach TOL. POH. Metal shavings 0 Estimated Kick-off Point at 11,423 MD. 0 0' 0 0 00 0'Minimum Depth 5.5" Maximum in Gallons/stroke 0 0 0 0 0 0 0 0 0 C-2 Gas Summary Unit Phone: 0 A.Paul Kalenuik Set AtSize 40.0 L-80 Grade Depth in / outBit Type RPM 3599' 180.0 50.0 Report By: 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) Cly . . 3 * 24 hr Recap: Report By: 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) Cly Depth in / outBit Type RPM 3599' 180.0 50.0 Unit Phone: 0 A.Paul Kalenuik Set AtSize 40.0 L-80 Grade 0 0 C-2 Gas Summary 0 0 0 0 0 0 Gallons/stroke 0 0 0'Minimum Depth 5.5" Maximum in 0 0' 0 0 0 Monitor well. Static. POH to 9862' Pumped 20 bbl 10.9 lb/gal dry job. POH. L/D Baker tools. 0 Date: Time: 0 Alkal Coal 0 21813' 21813' 0' Lime TuffGvl C-5n 24 Hour Progress: SPP (psi) Max @ ft Current Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 1.117 1650 3324' 12.25"0.960 Footage Sh AK-AM-0900577139 $3,410.00 $106,410.00 Testing BOP PV cP Weight Flow In (gpm) 0 Size Hours 0 Cement C-1 C-5i C-3 Chromatograph (ppm) 0 0 00 C-4i C-4n 0 3484' 43.20 6115' 23.40 66/34 15.0 25.0 Lst 100 (lb/100ft2) 9.30 Type 17 Smith MDI816LVEBPX PDC 0 Mud (lb/bbl)ml/30min 2.862.20 (max) Average Comments 0Background Trip 100% Gas In Air=10,000 Units0Connection 8-8-RO-Sh-X-1-BT-ROP2 Clean rig floor. Drain stack and pull wear ring. Rig up and Test BOP's. Metal shavings on magnet. Boot baskets:empty. 21813' Condition 2-1-WT-M-1-I-SD-TD Bit # 1 16"160' 12390'Hydril 3484' WOB Smith XR+ 6C Milltooth TFA Hycalog SKHI716D-E8C PDC 12.25" MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 21813 7.7 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 31 Customer: Well: Area: Location: Rig: SP36-W5L1 07/29/2013 24:00:00 Yesterday's Depth: ROP ROP (ft/hr) Keener/Wimmer/Buchanan 24 hr Max Density (ppg) out (sec/qt) Viscosity 180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10 . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Ross/Amend 24 hr Max Morning Report Report # 32 Customer: Well: Area: Location: Rig: SP36-W5 30-Jul-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 11480 64/36 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 8-8-RO-SH-X-1-BT-ROP Bit # 2 12.25 3484' 160'EVAMAR 3599' WOB 3 3470' 2806' Trip 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.25 (max) Comments 1-1-CT-G-X-IN-NO-TD Condition Lst Hydril C-3 Clyst 00 C-4i C-4n 0 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 5 Size Hours 20 8 10 AK-AM-0900577139 $3,410.00 $109,820.00 Displacing Mud PV cP (lb/100ft2) Flow In (spm) 1550 6115' 12.25 0.960 Footage 17 TFA 43.20 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.960 9.25 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 0 11482' 11482' 0' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 2 0 25 17 11456'Minimum Depth 13 3/8" Maximum in 13 Gallons/stroke 0 1 6 0 1 C-2 Gas Summary 30 205611472' 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 612 Set AtSize 178.9 X-65 Grade Depth in / out 15.0 Type Hycalog SKH17-E8C PDC Smith MDI816LVEBPX PDC Bit Type RPM 12405' 180 180.0 9599' 12.30 L-80 40.0 5 L-8012390' BTC 4.23 6.0 RIH with whipstock mill. Set whipstock and mill window. Displace mud and perform top drive maintenance. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . * 24 hr Recap: 3.90 6.0 Clean surface equipment after displacement. Worked on top drive. Monitored well with trip tank. POOH. Laid down Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) L-80 40.0 1 L-8012390' BTC Bit Type RPM Set AtSize 178.9 X-65 Grade Depth in / out Type Smith XR+ Milltooth 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 1783 C-2 Gas Summary 25 233911485' 1 0 0 3 Gallons/stroke 011481'Minimum Depth 13 3/8" Maximum in 3 0 0 0 392 mill BHA. Cleaned rig floor and flush stack. RIH with BHA #8. Shallow tested MWD at 1160' MD. RIH to 11431' MD. Drill ahead. 17 Date: Time: Oil / Water API FL 365 Alkal Coal ECD (ppg) Tools 0 11482' 11501' 19' Lime TuffGvl C-5n Current Depth 24 Hour Progress: 117 SPP (psi) Max @ ft Current 11501'49.832.4 Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.25 Ss Cht Silt Siltst ShCly 1549 Footage 15 TFA AK-AM-0900577139 $3,410.00 $3,410.00 Drilling Ahead PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 10 Size Hours 12 4 0 Cement C-1 C-5i Chromatograph (ppm) 00 C-4i C-4n 0 Lst 100 Hydril C-3 Clyst Mud (lb/bbl)ml/30min 3.00 (max) Comments Condition Average 8Background Trip 100% Gas In Air=10,000 UnitsConnection 3470' Bit # 5 8.75"11480' 160'EVAMAR WOB 64/36 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 11480 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 94.7 Morning Report Report # 33 Customer: Well: Area: Location: Rig: SP36-W5 31-Jul-2013 24:00:00 Yesterday's Depth: 1422 ROP ROP (ft/hr) Ross/Amend 24 hr Max Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Ross/Amend 24 hr Max Morning Report Report # 34 Customer: Well: Area: Location: Rig: SP36-W5 1-Aug-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 158.5 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 11617 64/36 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 6 3470' Trip 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.00 (max) Comments Condition Lst 100 Hydril C-3 Clyst 00 C-4i C-4n 0 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 15 Size Hours 39 12 AK-AM-0900577139 $3,410.00 $6,820.00 Cut and Slip PV cP (lb/100ft2) Flow In (spm) 1650 19' 8.75"0.902 Footage 16 TFA 0.50 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.25 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 11619'33.1 0 11501' 11620' 119' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 2 0 41 Slip and cut drill line. 28 11501'Minimum Depth 13 3/8" Maximum in 8 Gallons/stroke 0 3 8 0 5 C-2 Gas Summary 63 663211620' 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 2348 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth Bit Type RPM 37.0 11620' L-80 40.0 0 L-8012390' BTC 3.90 6.0 Drill from 11501' MD to 11620' MD. POOH and laid down BHA. Picked up new BHA and ran in the hole to 11254' MD Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . * 24 hr Recap: 4.29 6.5 Service Rig. Drill from 11620' MD to 12465' MD. Back ream out of the hole from 12465' MD to 11454' MD. Perform Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 37.0 11620' Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth 907-685-0772Unit Phone: 59 Paul Kalenuik (current) 8819 C-2 Gas Summary 805 9622312582' 19 259 0 51 Gallons/stroke 011620'Minimum Depth 13 3/8" Maximum in 2 0 279 110 0 FIT. Run in the hole and drill ahead. 120 Date: Time: Oil / Water API FL 546 Alkal Coal ECD (ppg) Tools 0 11620' 12652' 1032' Lime TuffGvl C-5n Current Depth 24 Hour Progress: 124 SPP (psi) Max @ ft Current 12651'62.7182.7 Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.20 Ss Cht Silt Siltst ShCly 1650 19' 8.75"0.902 Footage 18 TFA 0.50 AK-AM-0900577139 $3,410.00 $10,230.00 Drilling ahead PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 72 Size Hours 930 704 0 Cement C-1 C-5i Chromatograph (ppm) 320 C-4i C-4n 7 Lst 100 Hydril C-3 Clyst Mud (lb/bbl)ml/30min 3.30 (max) Comments Condition Average Background Trip 100% Gas In Air=10,000 Units726Connection 6 3470' 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 66/34 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 12465 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 419.1 Morning Report Report # 35 Customer: Well: Area: Location: Rig: SP36-W5 2-Aug-2013 24:00:00 Yesterday's Depth: 3024 ROP ROP (ft/hr) Ross/Amend 24 hr Max Density (ppg) out (sec/qt) Viscosity . . 6 * 24 hr Recap: 1560.902 11620'1032'3 Density (ppg) out (sec/qt) Viscosity 3204 ROP ROP (ft/hr) Ross/Amend/Buchanan 24 hr Max Morning Report Report # 36 Customer: Well: Area: Location: Rig: SP36-W5L1 08/03/2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 428.0 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 14959 7.4 MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm) 12390'Hydril WOBTFA Smith MDSi616EBPX PDC 8.75" ConditionBit # 0-0-WT-A-E No-BHA5 Drilling ahead currently through the lateral. 100% Gas In Air=10,000 Units645Connection Comments 20Background Trip (max) Average 0 Mud (lb/bbl)ml/30min 3.382.60 Lst 100 (lb/100ft2) 9.20 Type 19 Smith XR+ Milltooth 11480' 0.50 19' 66/34 8 0401 C-4i C-4n 197 C-3 Chromatograph (ppm) 1572 1338 848 Size Hours 4 Cement C-1 C-5i Sh AK-AM-0900577139 $3,410.00 $13,640.00 Drilling ahead PV cP Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 1446 8.75"0.746 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' 24 Hour Progress: 130 SPP (psi) Max @ ft Current 13448'121.60.0 0 12652' 15364' 2712' Lime TuffGvl C-5n Date: Time: 550 Alkal Coal Drilling F/12652' T/15364'. 871 Samples have been sandstone with some siltstone rarely seen. Accessory minerals seen: glauconite, mica, and pyrite. well srt, uncons, sli slty, tr glauc, r sh frag, r mic, r pyr, SHOW: brn stn, sli odor, 40% even dull yel fluor, dull lt yel-wh ct fluor, lt yl ct. Some shell fragments have been seen. Typical sample : Sandstone : trnsl-trnsp-lt gy-wh-crm-gn-blk, m-vf gr, ang-sb ang, 16 15320' 0 685 3232145 12652'Minimum Depth Maximum in Gallons/stroke 4 82012 336 575 0 731 233195 0 96 C-2 Gas Summary Unit Phone: 0 A.Paul Kalenuik Set AtSize 40.0 L-80 Grade Depth in / outBit Type RPM 11620' 37 Report By: 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) Cly . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 3048 ROP ROP (ft/hr) Ross/Amend 24 hr Max Morning Report Report # 37 Customer: Well: Area: Location: Rig: SP36-W5 4-Aug-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 470.9 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 17507 67/33 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 6 3470' Trip 100% Gas In Air=10,000 Units645Connection Average 20Background Mud (lb/bbl)ml/30min 2.70 (max) Comments Condition Lst 100 Hydril C-3 Clyst 0421 C-4i C-4n 228 7 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 793 Size Hours 1477 1175 AK-AM-0900577139 $3,410.00 $17,050.00 Drilling ahead PV cP (lb/100ft2) Flow In (spm) 1547 19' 8.75"0.902 Footage 19 TFA 0.50 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.20 Current Depth 24 Hour Progress: 109 SPP (psi) Max @ ft Current 17788'107.8 0 15364' 17789' 2425' Lime TuffGvl C-5n 478 Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 654 328 84 Accessory minerals seen: glauconite, mica, and pyrite. Some shell fragments have been seen. 737 15364'Minimum Depth 13 3/8" Maximum in 18 Gallons/stroke 5 339 560 3 712 C-2 Gas Summary 1333 14235417724' 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 66629 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth Bit Type RPM 37.0 11620' L-80 40.0 0 L-8012390' BTC 3.51 7.1 Drill ahead from 15364' MD to 17789' MD. Samples have been sandstone and a decrease in accesory minerals. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . * 24 hr Recap: 3.77 7.0 Drill ahead from 17789' MD to 19636' MD. Samples have been sandstone and a decrease in accesory minerals. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 37.0 11620' Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 37365 C-2 Gas Summary 978 9912619562' 221 440 2 425 Gallons/stroke 317789'Minimum Depth 13 3/8" Maximum in 17 0 522 270 50 Accessory minerals seen: glauconite, mica, and pyrite. Some shell fragments have been seen. 526 Date: Time: Oil / Water API FL 525 Alkal Coal ECD (ppg) Tools 0 17789' 19636' 1847' Lime TuffGvl C-5n Current Depth 24 Hour Progress: 123 SPP (psi) Max @ ft Current 19634'83.675.0 Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.20 Ss Cht Silt Siltst ShCly 1346 19' 8.75"0.902 Footage 21 TFA 0.50 AK-AM-0900577139 $3,410.00 $20,460.00 Drilling ahead PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 475 Size Hours 1146 953 7 Cement C-1 C-5i Chromatograph (ppm) 0270 C-4i C-4n 162 Lst 100 Hydril C-3 Clyst Mud (lb/bbl)ml/30min 2.90 (max) Comments Condition Average 24Background Trip 100% Gas In Air=10,000 Units645Connection 6 3470' 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 68/32 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 19396 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 432.6 Morning Report Report # 38 Customer: Well: Area: Location: Rig: SP36-W5 5-Aug-2013 24:00:00 Yesterday's Depth: 3499 ROP ROP (ft/hr) Ross/Amend 24 hr Max Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity 3149 ROP ROP (ft/hr) Ross/Amend 24 hr Max Morning Report Report # 39 Customer: Well: Area: Location: Rig: SP36-W5 6-Aug-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 420.6 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 61/39 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 6 3470' Trip 100% Gas In Air=10,000 Units296Connection Average Background Mud (lb/bbl)ml/30min 3.00 (max) Comments Condition Lst 100 Hydril C-3 Clyst 0174 C-4i C-4n 116 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 343 Size Hours 1112 801 AK-AM-0900577139 $3,410.00 $23,870.00 BROOH PV cP (lb/100ft2) Flow In (spm) 1447 19' 8.75"0.902 Footage 21 TFA 0.50 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.15 Current Depth 24 Hour Progress: 124 SPP (psi) Max @ ft Current 20868'51.3 0 19636' 20870' 1234' Lime TuffGvl C-5n 499 Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 465 252 50 335 19545'Minimum Depth 13 3/8" Maximum in 22 Gallons/stroke 0 150 415 0 231 C-2 Gas Summary 841 9171320869' 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 27366 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth Bit Type RPM 37.0 11620' L-80 40.0 0 L-8012390' BTC 3.90 7.1 Drill ahead from 19636' MD to 20870' MD TD. Begin back reaming out of the hole. Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . 6 * 24 hr Recap: 1560.902 11620'1032'3 Density (ppg) out (sec/qt) Viscosity 2306 ROP ROP (ft/hr) Ross/Wimmer 24 hr Max Morning Report Report # 40 Customer: Well: Area: Location: Rig: SP36-W5L1 08/07/2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 0.0 Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 7.1 MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm) 12390'Hydril WOBTFA Smith MDSi616EBPX PDC 8.75" ConditionBit # 0-0-WT-A-E No-BHA5 100% Gas In Air=10,000 Units0Connection Comments 0Background Trip (max) Average 0 Mud (lb/bbl)ml/30min 3.642.80 Lst 100 (lb/100ft2) 9.20 Type 18 Smith XR+ Milltooth 11480' 0.50 19' 69/31 8 00 C-4i C-4n 0 C-3 Chromatograph (ppm) 0 0 0 Size Hours 7 Cement C-1 C-5i Sh AK-AM-0900577139 $3,410.00 $27,280.00 BROOH PV cP Weight Flow In (gpm) Siltst Casing Summary Lithology (%) 1446 8.75"0.746 Footage (current) Units* ClystSsChtSilt Oil / Water ECD (ppg) Tools API FL Depth 0'to0' 24 Hour Progress: 121 SPP (psi) Max @ ft Current 0.00.0 0 20870' 20870' 0' Lime TuffGvl C-5n Date: Time: 494 Alkal Coal Currently BROOH F/ 20870' T/9994 0 0 0 0 00 Minimum Depth Maximum in Gallons/stroke 0 0 0 0 0 0 0 0 0 C-2 Gas Summary Unit Phone: 0 A.Paul Kalenuik Set AtSize 40.0 L-80 Grade Depth in / outBit Type RPM 11620' 37 Report By: 9 5/8" Logging Engineers:A.Paul kalenuik/ Kori Plowman (max)(current) Cly . . * 24 hr Recap: 3.51 7.1 Back ream out of the hole to surface. TIH to retrieve whipstock. At 2883' MD pressure spikes were seen. Hole was Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 20870' 156 37.0 11620' 55.80 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 0 C-2 Gas Summary 0 0 0 0 0 Gallons/stroke 0Minimum Depth 13 3/8" Maximum in 0 0 0 0 filled to try and free blockage but the attempts failed. Began POOH. Date: Time: Oil / Water API FL Alkal Coal ECD (ppg) Tools 0 20870' 20870' 0' Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.20 Ss Cht Silt Siltst ShCly 1445 19' 8.75"0.902 Footage 18 TFA 0.50 AK-AM-0900577139 $3,410.00 $30,390.00 POOH PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 3 0 Cement C-1 C-5i Chromatograph (ppm) 00 C-4i C-4n 0 Lst 100 Hydril C-3 Clyst Mud (lb/bbl)ml/30min 2.70 (max) Comments Condition Average Background Trip 100% Gas In Air=10,000 UnitsConnection 6 3470' 9250' 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 69/31 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 41 Customer: Well: Area: Location: Rig: SP36-W5 8-Aug-2013 24:00:00 Yesterday's Depth: ROP ROP (ft/hr) Ross/Amend 24 hr Max Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Ross/Amend 24 hr Max Morning Report Report # 42 Customer: Well: Area: Location: Rig: SP36-W5 9-Aug-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 69/31 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 6 3470' 9250' Trip 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min 3.00 (max) Comments Condition Lst Hydril C-3 Clyst 00 C-4i C-4n 0 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 3 AK-AM-0900577139 $2,810.00 $33,200.00 POOH PV cP (lb/100ft2) Flow In (spm) 1247 19' 8.75"0.902 Footage 19 TFA 0.50 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.30 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 0 20870' 20870' 0' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 0 0 0 MD. Began POOH with whipstock BHA. Minimum Depth 13 3/8" Maximum in Gallons/stroke 0 0 0 0 0 C-2 Gas Summary 0 907-685-0772Unit Phone: 0 Paul Kalenuik (current) 0 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth Bit Type RPM 20870' 156 37.0 11620' 55.80 L-80 40.0 0 L-8012390' BTC 3.90 7.5 POOH to Insp tool and MWD. Debris found inside MWD. Laid down MWD. RIH the hole and tag hook slot at 11441' Report By: 20" 9 5/8" Logging Engineers:Paul Kalenuik / Kori Plowman (max) . . 6 * 24 hr Recap: Report By: 9 5/8" Logging Engineers:Jeremy Tiegs/ Kori Plowman (max)(current) Cly Depth in / outBit Type RPM 11620' 37 Unit Phone: 0 Jeremy Tiegs Set AtSize 40.0 L-80 Grade 0 0 C-2 Gas Summary 0 0 0 0 0 0 Gallons/stroke 0 0 Minimum Depth Maximum in 0 0 0 0 Con't POOH F/4849' T/BHA. L/D BHA. 0 Date: Time: 0 Alkal Coal 0 20870' 20870' 0' Lime TuffGvl C-5n 24 Hour Progress: 0 SPP (psi) Max @ ft Current 0.00.0 Oil / Water ECD (ppg) Tools API FL Depth 0'to0' (current) Units* ClystSsChtSiltSiltst Casing Summary Lithology (%) 1247 8.75"0.746 Footage Sh AK-AM-0900577139 $2,810.00 $36,010.00 Running In Liner PV cP Weight Flow In (gpm) 0 Size Hours 7 Cement C-1 C-5i C-3 Chromatograph (ppm) 0 0 00 C-4i C-4n 0 11480' 2.50 19' 69/31 8 Lst 100 (lb/100ft2) 9.30 Type 20 Smith XR+ Milltooth 0 Mud (lb/bbl)ml/30min 4.033.10 (max) Average Comments 0Background Trip 100% Gas In Air=10,000 Units0Connection 0-0-WT-A-E No-BHA5 Run 5.5" 15.5# L80 H521 slotted liner F/Surface T/6027'. R/U Franks casing running equipment. ConditionBit # 12390'Hydril WOBTFA Smith MDSi616EBPX PDC 8.75" MWD Summary 0.96 %Mud Type FazePro NA Ratio Mud Data Depth Flow In (spm)4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 7.4 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg 0.0 Morning Report Report # 43 Customer: Well: Area: Location: Rig: SP36-W5L1 08/10/2013 24:00:00 Yesterday's Depth: 0 ROP ROP (ft/hr) Ross/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity 1560.902 55.80 11620'20870'9250'3 . . * 24 hr Recap: 3.90 7.5 Continued to run in the hole with 5.5" liner. Rig down running tool. Prepare for displacement. Report By: 20" 9 5/8" Logging Engineers:Jeremy Tiegs / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 20870' 156 37.0 11620' 55.80 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth 907-685-0772Unit Phone: 0 Jeremy Tiegs (current) 0 C-2 Gas Summary 0 0 0 0 0 Gallons/stroke 0Minimum Depth 13 3/8" Maximum in 0 0 0 0 Date: Time: Oil / Water API FL Alkal Coal ECD (ppg) Tools 0 20870' 20870' 0' Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.30 Ss Cht Silt Siltst ShCly 1247 19' 8.75"0.902 Footage 19 TFA 0.50 AK-AM-0900577139 $2,810.00 $38,820.00 Prepare to Displace Mud PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 3 0 Cement C-1 C-5i Chromatograph (ppm) 00 C-4i C-4n 0 Lst Hydril C-3 Clyst Mud (lb/bbl)ml/30min 3.00 (max) Comments Condition Average Background Trip 100% Gas In Air=10,000 UnitsConnection 6 3470' 9250' 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 69/31 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 44 Customer: Well: Area: Location: Rig: SP36-W5 11-Aug-2013 24:00:00 Yesterday's Depth: ROP ROP (ft/hr) Ross/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity . . * 24 hr Recap: Density (ppg) out (sec/qt) Viscosity ROP ROP (ft/hr) Ross/Wimmer 24 hr Max Morning Report Report # 45 Customer: Well: Area: Location: Rig: SP36-W5 12-Aug-2013 24:00:00 Yesterday's Depth:ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Cor Solids Avg Min YP Max 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB 6 3470' 9250' Trip 100% Gas In Air=10,000 UnitsConnection Average Background Mud (lb/bbl)ml/30min (max) Comments Condition Lst Hydril C-3 Clyst 00 C-4i C-4n 0 0 Cement C-1 C-5i Chromatograph (ppm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 3 AK-AM-0900577139 $2,810.00 $41,630.00 Testing BOPs PV cP (lb/100ft2) Flow In (spm) 27 19' 8.75"0.902 FootageTFA 0.50 Ss Cht Silt Siltst ShCly Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.15 Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current 0 20870' 20870' 0' Lime TuffGvl C-5n Alkal Coal ECD (ppg) Tools Date: Time: Oil / Water API FL 0 0 0 0 install test plug. Rig up to test BOPs. Begin testing BOPs. Minimum Depth 13 3/8" Maximum in Gallons/stroke 0 0 0 0 0 C-2 Gas Summary 0 907-685-0772Unit Phone: 0 Jeremy Tiegs (current) 0 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth Bit Type RPM 20870' 156 37.0 11620' 55.80 L-80 40.0 0 L-8012390' BTC Displace OBM. Slip and cut drill line. Clean surface equipment. POOH and lay down running tool. Pull W/R and Report By: 20" 9 5/8" Logging Engineers:Jeremy Tiegs / Kori Plowman (max) . . * 24 hr Recap: connection to 5000 psi. Completed BOP test. Rig up completion equipment. RIH with lower completeiong tbg to bottom of jt #1. Test Report By: 20" 9 5/8" Logging Engineers:Jeremy Tiegs / Kori Plowman (max) L-80 40.0 0 L-8012390' BTC Bit Type RPM 20870' 156 37.0 11620' 55.80 Set AtSize 178.9 X-65 Grade Depth in / out 8.0 Type Smith MDSI616EBPX PDC Smith XR+ Milltooth 907-685-0772Unit Phone: 0 Jeremy Tiegs (current) 0 C-2 Gas Summary 0 0 0 0 0 Gallons/stroke 0Minimum Depth 13 3/8" Maximum in 0 0 0 0 Date: Time: Oil / Water API FL Alkal Coal ECD (ppg) Tools 0 20870' 20870' 0' Lime TuffGvl C-5n Current Depth 24 Hour Progress: SPP (psi) Max @ ft Current Depth 0'to0' (current) Units* Casing Summary Lithology (%) 0.746 9.15 Ss Cht Silt Siltst ShCly 27 19' 8.75"0.902 FootageTFA 0.50 AK-AM-0900577139 $2,810.00 $44,440.00 Test 4.5" Tbg Conn PV cP (lb/100ft2) Flow In (spm) 68.0 Weight Flow In (gpm) 0 Size Hours 0 0 3 0 Cement C-1 C-5i Chromatograph (ppm) 00 C-4i C-4n 0 Lst Hydril C-3 Clyst Mud (lb/bbl)ml/30min (max) Comments Condition Average Background Trip 100% Gas In Air=10,000 UnitsConnection 6 3470' 9250' 0-0WT-A-E-NO-BHA Bit # 5 8.75"11480' 160'EVAMAR 11620' WOB MWD Summary 0.96 %Mud Type FazePro Ratio Mud Data Depth 4.23 @ Current Pump & Flow Data: Doyon 15 Report For: 20870 Cor Solids Avg Min YP Max ENI Petroleum SPY ISLAND North Slope Job No.: Daily Charges: Total Charges: Rig Activity: Avg Morning Report Report # 46 Customer: Well: Area: Location: Rig: SP36-W5 13-Aug-2013 24:00:00 Yesterday's Depth: ROP ROP (ft/hr) Keener/Wimmer 24 hr Max Density (ppg) out (sec/qt) Viscosity WELL INFORMATION Customer :Eni Petroleum Well Name :SP36-W5 Job Number :AK-XX-0900577139 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 40.57 0.00 0.00 40.57 0.00 N 0.00 E 0.00 0.00 79.86 0.60 288.64 79.86 0.07 N 0.19 W 0.07 1.53 119.60 0.68 279.83 119.60 0.17 N 0.62 W 0.17 0.32 124.31 0.86 277.26 124.31 0.18 N 0.69 W 0.18 3.89 133.21 0.78 273.99 133.21 0.19 N 0.81 W 0.19 1.04 143.13 0.61 266.62 143.12 0.20 N 0.93 W 0.20 1.93 153.18 0.38 236.25 153.17 0.17 N 1.01 W 0.17 3.40 162.88 0.36 188.01 162.87 0.13 N 1.05 W 0.13 3.12 183.44 0.87 162.94 183.43 0.09 S 1.01 W -0.09 2.75 193.03 1.18 165.42 193.02 0.25 S 0.96 W -0.25 3.26 204.76 1.53 166.67 204.75 0.52 S 0.90 W -0.52 2.99 214.53 1.90 168.34 214.51 0.81 S 0.83 W -0.81 3.82 224.41 2.18 168.06 224.39 1.15 S 0.76 W -1.15 2.84 234.64 2.59 169.49 234.61 1.57 S 0.68 W -1.57 4.05 263.85 3.54 176.29 263.78 3.12 S 0.50 W -3.12 3.48 295.43 4.79 177.99 295.27 5.41 S 0.39 W -5.41 3.98 326.22 5.44 187.18 325.94 8.14 S 0.53 W -8.14 3.39 358.64 5.43 192.89 358.21 11.16 S 1.06 W -11.16 1.67 388.02 6.01 197.03 387.45 13.99 S 1.82 W -13.99 2.42 449.10 7.91 198.98 448.08 21.02 S 4.13 W -21.02 3.13 541.98 11.58 201.63 539.60 35.73 S 9.64 W -35.73 3.98 634.91 13.57 201.81 630.30 54.53 S 17.13 W -54.53 2.14 728.11 17.88 200.32 719.99 78.11 S 26.17 W -78.11 4.64 821.36 21.90 198.81 807.66 108.01 S 36.75 W -108.01 4.35 914.91 25.48 197.54 893.31 143.72 S 48.44 W -143.72 3.87 972.32 27.29 196.58 944.74 168.11 S 55.92 W -168.11 3.24 1065.55 29.68 194.53 1,026.68 210.94 S 67.81 W -210.94 2.77 1158.85 31.40 193.85 1,107.03 256.91 S 79.43 W -256.91 1.88 1252.22 31.22 192.03 1,186.81 304.19 S 90.29 W -304.19 1.03 1345.58 35.22 190.04 1,264.90 354.39 S 100.03 W -354.39 4.44 1439.01 38.27 191.59 1,339.76 409.27 S 110.55 W -409.27 3.41 INSITE V7.4.20 Page 1Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1532.27 36.51 192.89 1,413.85 464.61 S 122.54 W -464.61 2.07 1625.52 38.05 195.34 1,488.05 519.37 S 136.33 W -519.37 2.29 1718.81 42.61 197.53 1,559.15 577.25 S 153.46 W -577.25 5.12 1812.13 45.51 198.59 1,626.21 638.93 S 173.59 W -638.93 3.21 1905.60 44.58 198.23 1,692.25 701.69 S 194.48 W -701.69 1.03 1999.02 44.70 197.52 1,758.72 764.16 S 214.63 W -764.16 0.55 2093.12 50.09 197.35 1,822.40 830.22 S 235.37 W -830.22 5.73 2185.64 52.83 197.76 1,880.04 899.21 S 257.20 W -899.21 2.98 2279.09 54.21 198.94 1,935.60 970.52 S 280.86 W -970.52 1.79 2372.47 57.26 199.59 1,988.17 1,043.36 S 306.33 W -1043.36 3.32 2466.17 61.03 199.89 2,036.21 1,119.06 S 333.49 W -1119.06 4.03 2559.23 60.99 201.82 2,081.32 1,195.12 S 362.47 W -1195.12 1.81 2652.67 62.94 206.70 2,125.25 1,270.26 S 396.37 W -1270.26 5.06 2746.10 59.58 211.60 2,170.19 1,341.79 S 436.20 W -1341.79 5.84 2839.36 56.47 216.03 2,219.59 1,407.51 S 480.16 W -1407.51 5.23 2932.67 58.66 222.19 2,269.67 1,468.54 S 529.84 W -1468.54 6.04 3025.95 61.75 226.80 2,316.03 1,526.22 S 586.58 W -1526.22 5.42 3101.21 65.59 229.54 2,349.41 1,571.17 S 636.84 W -1571.17 6.06 3201.21 70.59 232.32 2,386.72 1,629.58 S 708.86 W -1629.59 5.63 3300.89 74.94 233.36 2,416.25 1,687.07 S 784.72 W -1687.07 4.48 3400.09 79.25 234.14 2,438.40 1,744.23 S 862.68 W -1744.23 4.41 3500.12 81.46 236.18 2,455.16 1,800.55 S 943.62 W -1800.55 2.99 3568.13 82.92 235.35 2,464.40 1,838.46 S 999.32 W -1838.46 2.46 3661.52 83.26 234.57 2,475.64 1,891.69 S 1,075.23 W -1891.69 0.91 3754.95 82.98 232.80 2,486.83 1,946.62 S 1,149.97 W -1946.62 1.90 3848.27 82.73 231.87 2,498.44 2,003.20 S 1,223.26 W -2003.20 1.02 3941.53 83.14 230.67 2,509.91 2,061.10 S 1,295.46 W -2061.10 1.35 4034.87 83.14 230.19 2,521.06 2,120.14 S 1,366.90 W -2120.14 0.51 4128.26 82.84 229.03 2,532.46 2,180.20 S 1,437.49 W -2180.20 1.27 4221.78 82.64 228.38 2,544.27 2,241.42 S 1,507.19 W -2241.42 0.72 4315.17 82.33 224.61 2,556.49 2,305.15 S 1,574.34 W -2305.15 4.02 4408.56 83.03 228.36 2,568.40 2,368.91 S 1,641.50 W -2368.91 4.05 4501.98 83.14 227.96 2,579.64 2,430.78 S 1,710.59 W -2430.78 0.44 4595.41 83.07 227.55 2,590.86 2,493.13 S 1,779.26 W -2493.13 0.44 4688.75 82.89 228.16 2,602.27 2,555.30 S 1,847.94 W -2555.30 0.68 4782.11 83.02 228.50 2,613.72 2,616.90 S 1,917.16 W -2616.90 0.39 4875.57 82.98 228.35 2,625.11 2,678.45 S 1,986.55 W -2678.46 0.16 4969.02 83.23 228.47 2,636.33 2,740.04 S 2,055.94 W -2740.04 0.30 5062.44 82.97 228.63 2,647.55 2,801.43 S 2,125.45 W -2801.43 0.33 5155.83 83.16 229.06 2,658.83 2,862.44 S 2,195.25 W -2862.44 0.50 5249.27 83.26 229.11 2,669.87 2,923.21 S 2,265.37 W -2923.21 0.12 5342.98 82.75 229.00 2,681.29 2,984.16 S 2,335.63 W -2984.16 0.56 5436.09 83.49 229.61 2,692.44 3,044.44 S 2,405.71 W -3044.44 1.03 5529.50 82.75 229.92 2,703.63 3,104.34 S 2,476.51 W -3104.34 0.86 5622.89 83.11 229.47 2,715.12 3,164.29 S 2,547.18 W -3164.29 0.61 INSITE V7.4.20 Page 2Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 5716.30 83.22 229.48 2,726.24 3,224.55 S 2,617.68 W -3224.55 0.12 5809.69 83.19 228.93 2,737.29 3,285.14 S 2,687.89 W -3285.14 0.59 5903.05 82.88 229.55 2,748.61 3,345.64 S 2,758.08 W -3345.64 0.74 5996.51 83.05 229.59 2,760.06 3,405.80 S 2,828.69 W -3405.80 0.19 6089.93 81.99 229.46 2,772.22 3,465.92 S 2,899.14 W -3465.92 1.14 6183.28 82.21 229.79 2,785.05 3,525.82 S 2,969.59 W -3525.82 0.42 6276.69 82.27 230.00 2,797.66 3,585.44 S 3,040.38 W -3585.44 0.23 6370.12 81.99 230.65 2,810.46 3,644.53 S 3,111.61 W -3644.53 0.75 6463.54 82.10 231.08 2,823.38 3,702.92 S 3,183.37 W -3702.92 0.47 6556.97 81.87 231.70 2,836.41 3,760.65 S 3,255.67 W -3760.66 0.70 6650.37 82.12 231.68 2,849.42 3,817.99 S 3,328.24 W -3817.99 0.27 6743.79 82.17 232.56 2,862.19 3,874.81 S 3,401.29 W -3874.81 0.93 6837.25 82.50 233.41 2,874.65 3,930.57 S 3,475.24 W -3930.57 0.97 6930.75 82.72 233.74 2,886.68 3,985.63 S 3,549.85 W -3985.63 0.42 7024.07 82.24 234.09 2,898.89 4,040.12 S 3,624.62 W -4040.12 0.63 7117.46 82.66 233.68 2,911.16 4,094.69 S 3,699.41 W -4094.69 0.63 7210.85 82.40 233.98 2,923.30 4,149.34 S 3,774.16 W -4149.34 0.42 7304.31 82.43 233.82 2,935.64 4,203.92 S 3,849.01 W -4203.92 0.17 7397.70 82.56 233.41 2,947.84 4,258.85 S 3,923.55 W -4258.85 0.46 7491.12 82.52 233.38 2,959.97 4,314.08 S 3,997.91 W -4314.08 0.05 7584.50 82.49 232.60 2,972.15 4,369.81 S 4,071.84 W -4369.81 0.83 7677.93 82.56 233.01 2,984.30 4,425.81 S 4,145.63 W -4425.81 0.44 7771.52 82.49 232.22 2,996.48 4,482.15 S 4,219.36 W -4482.16 0.84 7864.88 82.46 231.75 3,008.70 4,539.16 S 4,292.28 W -4539.16 0.50 7958.35 82.59 231.07 3,020.86 4,596.96 S 4,364.72 W -4596.96 0.73 8051.72 82.49 231.02 3,032.99 4,655.17 S 4,436.72 W -4655.17 0.12 8145.13 83.35 231.28 3,044.50 4,713.32 S 4,508.91 W -4713.32 0.96 8238.46 82.72 231.20 3,055.82 4,771.31 S 4,581.15 W -4771.31 0.68 8330.13 83.14 230.93 3,067.10 4,828.48 S 4,651.91 W -4828.49 0.54 8425.04 83.07 230.57 3,078.49 4,888.10 S 4,724.88 W -4888.10 0.38 8518.40 83.01 230.67 3,089.81 4,946.90 S 4,796.51 W -4946.90 0.12 8611.85 83.07 230.49 3,101.13 5,005.80 S 4,868.17 W -5005.80 0.20 8705.13 83.07 230.21 3,112.39 5,064.89 S 4,939.46 W -5064.89 0.30 8798.41 83.07 231.87 3,123.64 5,123.11 S 5,011.46 W -5123.11 1.77 8891.79 82.80 230.29 3,135.13 5,181.33 S 5,083.56 W -5181.33 1.70 8985.19 82.80 229.73 3,146.83 5,240.88 S 5,154.56 W -5240.88 0.59 9078.75 83.20 229.05 3,158.24 5,301.32 S 5,225.05 W -5301.32 0.84 9172.15 82.03 229.62 3,170.24 5,361.68 S 5,295.31 W -5361.68 1.39 9265.52 82.67 228.78 3,182.67 5,422.14 S 5,365.36 W -5422.15 1.12 9358.72 82.64 229.13 3,194.59 5,482.84 S 5,435.07 W -5482.84 0.37 9451.97 82.78 228.76 3,206.42 5,543.59 S 5,504.82 W -5543.59 0.42 9545.52 83.44 228.70 3,217.64 5,604.85 S 5,574.63 W -5604.85 0.71 9636.18 82.29 232.47 3,228.91 5,661.96 S 5,644.11 W -5661.96 4.32 9729.41 80.99 234.87 3,242.46 5,716.60 S 5,718.41 W -5716.60 2.90 9822.71 81.55 238.04 3,256.63 5,767.56 S 5,795.26 W -5767.56 3.41 INSITE V7.4.20 Page 3Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 9916.08 81.10 242.17 3,270.72 5,813.55 S 5,875.26 W -5813.55 4.40 10009.44 81.19 245.33 3,285.09 5,854.35 S 5,957.99 W -5854.35 3.35 10102.87 81.57 248.78 3,299.10 5,890.35 S 6,043.04 W -5890.35 3.67 10196.13 82.23 253.20 3,312.25 5,920.41 S 6,130.31 W -5920.42 4.75 10289.38 82.29 258.43 3,324.81 5,943.05 S 6,219.86 W -5943.05 5.56 10382.67 82.62 264.37 3,337.07 5,956.87 S 6,311.26 W -5956.87 6.32 10475.99 82.81 269.65 3,348.91 5,961.70 S 6,403.67 W -5961.70 5.62 10569.46 83.19 272.14 3,360.31 5,960.25 S 6,496.42 W -5960.25 2.68 10662.88 83.65 274.19 3,371.01 5,955.12 S 6,589.08 W -5955.12 2.23 10756.15 84.17 276.01 3,380.91 5,946.88 S 6,681.45 W -5946.88 2.02 10849.50 84.50 278.22 3,390.13 5,935.37 S 6,773.63 W -5935.37 2.38 10942.95 84.39 279.69 3,399.17 5,920.89 S 6,865.50 W -5920.90 1.57 11036.33 84.52 281.66 3,408.20 5,903.68 S 6,956.83 W -5903.68 2.10 11129.75 84.20 283.99 3,417.38 5,883.04 S 7,047.47 W -5883.04 2.51 11223.09 84.50 286.52 3,426.57 5,858.61 S 7,137.08 W -5858.61 2.72 11316.53 84.42 288.41 3,435.59 5,830.70 S 7,225.79 W -5830.70 2.02 11409.96 84.56 290.05 3,444.56 5,800.07 S 7,313.60 W -5800.07 1.75 11503.22 83.99 292.51 3,453.87 5,766.39 S 7,400.06 W -5766.39 2.69 11596.53 84.21 295.46 3,463.46 5,728.67 S 7,484.85 W -5728.67 3.15 11689.81 84.97 299.04 3,472.26 5,686.15 S 7,567.39 W -5686.15 3.91 11783.12 85.67 302.88 3,479.87 5,638.32 S 7,647.13 W -5638.32 4.17 11876.47 86.26 306.53 3,486.45 5,585.31 S 7,723.66 W -5585.31 3.95 11969.81 87.10 309.90 3,491.85 5,527.67 S 7,796.87 W -5527.67 3.72 12063.22 87.81 313.30 3,496.00 5,465.73 S 7,866.64 W -5465.73 3.71 12156.59 88.43 315.81 3,499.06 5,400.26 S 7,933.13 W -5400.26 2.77 12249.97 88.42 317.83 3,501.63 5,332.19 S 7,997.00 W -5332.19 2.16 12343.33 87.14 316.03 3,505.25 5,264.05 S 8,060.70 W -5264.05 2.36 12360.33 86.71 315.37 3,506.16 5,251.90 S 8,072.56 W -5251.90 4.63 12458.17 87.32 314.16 3,511.26 5,183.10 S 8,141.93 W -5183.10 1.38 12494.47 87.00 312.50 3,513.05 5,158.22 S 8,168.30 W -5158.22 4.65 12587.86 87.32 310.68 3,517.68 5,096.30 S 8,238.06 W -5096.31 1.98 12681.04 84.76 310.43 3,524.12 5,035.87 S 8,308.68 W -5035.87 2.76 12774.50 86.94 310.11 3,530.88 4,975.62 S 8,379.80 W -4975.62 2.36 12867.84 86.40 309.15 3,536.30 4,916.19 S 8,451.57 W -4916.19 1.18 12961.16 87.83 308.94 3,541.00 4,857.48 S 8,523.95 W -4857.48 1.55 13054.46 88.63 309.46 3,543.88 4,798.54 S 8,596.22 W -4798.54 1.02 13147.82 90.12 310.22 3,544.90 4,738.73 S 8,667.90 W -4738.74 1.79 13241.20 91.08 311.11 3,543.92 4,677.89 S 8,738.72 W -4677.89 1.40 13334.59 90.70 311.69 3,542.47 4,616.14 S 8,808.77 W -4616.14 0.74 13428.02 90.59 311.72 3,541.42 4,553.98 S 8,878.52 W -4553.98 0.12 13521.34 90.77 311.64 3,540.31 4,491.93 S 8,948.21 W -4491.93 0.21 13614.60 89.61 310.48 3,540.00 4,430.68 S 9,018.53 W -4430.68 1.76 13707.94 91.25 310.35 3,539.30 4,370.17 S 9,089.59 W -4370.17 1.76 13801.33 92.56 311.02 3,536.20 4,309.32 S 9,160.36 W -4309.32 1.58 13895.95 92.80 310.92 3,531.77 4,247.35 S 9,231.73 W -4247.35 0.27 INSITE V7.4.20 Page 4Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 13988.24 91.78 311.40 3,528.08 4,186.66 S 9,301.16 W -4186.66 1.22 14081.63 91.42 311.02 3,525.48 4,125.16 S 9,371.39 W -4125.16 0.56 14174.44 91.11 311.48 3,523.43 4,063.98 S 9,441.15 W -4063.98 0.60 14268.48 90.79 311.49 3,521.87 4,001.69 S 9,511.58 W -4001.69 0.34 14361.82 90.60 311.71 3,520.74 3,939.72 S 9,581.38 W -3939.73 0.31 14455.18 91.11 312.35 3,519.34 3,877.23 S 9,650.72 W -3877.23 0.88 14548.64 90.43 312.46 3,518.09 3,814.21 S 9,719.72 W -3814.21 0.74 14642.09 90.52 311.58 3,517.31 3,751.65 S 9,789.14 W -3751.65 0.95 14735.51 91.29 312.10 3,515.84 3,689.35 S 9,858.73 W -3689.35 0.99 14828.90 89.48 310.83 3,515.21 3,627.51 S 9,928.71 W -3627.51 2.37 14922.34 89.01 311.22 3,516.44 3,566.19 S 9,999.20 W -3566.19 0.65 15015.71 88.84 311.41 3,518.19 3,504.55 S 10,069.31 W -3504.55 0.27 15109.16 90.25 311.65 3,518.94 3,442.60 S 10,139.27 W -3442.60 1.53 15202.57 89.28 311.89 3,519.32 3,380.38 S 10,208.93 W -3380.38 1.07 15295.96 87.42 310.87 3,522.01 3,318.67 S 10,278.98 W -3318.67 2.27 15389.37 86.94 310.37 3,526.60 3,257.93 S 10,349.79 W -3257.93 0.74 15482.76 88.48 311.74 3,530.33 3,196.64 S 10,420.15 W -3196.65 2.21 15576.12 89.96 312.33 3,531.61 3,134.14 S 10,489.49 W -3134.14 1.71 15669.58 90.58 312.23 3,531.17 3,071.27 S 10,558.63 W -3071.27 0.67 15763.00 90.41 312.11 3,530.36 3,008.55 S 10,627.87 W -3008.55 0.22 15856.38 90.89 312.36 3,529.30 2,945.79 S 10,697.00 W -2945.79 0.58 15949.76 90.85 312.64 3,527.88 2,882.71 S 10,765.84 W -2882.71 0.30 16043.19 90.80 312.12 3,526.54 2,819.74 S 10,834.85 W -2819.74 0.56 16136.61 90.40 312.56 3,525.56 2,756.82 S 10,903.90 W -2756.82 0.64 16230.04 89.96 311.28 3,525.26 2,694.41 S 10,973.42 W -2694.41 1.45 16323.44 89.73 310.42 3,525.52 2,633.31 S 11,044.07 W -2633.32 0.95 16416.86 89.93 311.26 3,525.79 2,572.22 S 11,114.74 W -2572.22 0.92 16510.32 90.16 311.43 3,525.72 2,510.49 S 11,184.91 W -2510.49 0.31 16603.82 90.34 311.87 3,525.31 2,448.35 S 11,254.77 W -2448.35 0.51 16697.14 91.35 311.92 3,523.94 2,386.04 S 11,324.23 W -2386.04 1.08 16790.53 91.79 312.03 3,521.38 2,323.60 S 11,393.63 W -2323.60 0.49 16883.92 92.50 312.13 3,517.88 2,261.06 S 11,462.90 W -2261.06 0.77 16977.38 92.31 311.82 3,513.96 2,198.61 S 11,532.32 W -2198.61 0.39 17070.77 91.08 311.76 3,511.20 2,136.40 S 11,601.92 W -2136.40 1.32 17164.19 88.59 311.23 3,511.47 2,074.51 S 11,671.88 W -2074.51 2.73 17257.57 89.80 311.03 3,512.78 2,013.10 S 11,742.21 W -2013.10 1.31 17351.00 90.41 311.15 3,512.61 1,951.69 S 11,812.63 W -1951.69 0.67 17444.59 90.47 310.71 3,511.89 1,890.38 S 11,883.33 W -1890.38 0.47 17537.95 87.46 310.88 3,513.58 1,829.40 S 11,953.99 W -1829.40 3.23 17631.42 85.26 309.84 3,519.51 1,768.99 S 12,025.06 W -1769.00 2.60 17724.79 86.90 310.12 3,525.89 1,709.14 S 12,096.44 W -1709.15 1.78 17818.20 89.91 310.77 3,528.49 1,648.58 S 12,167.49 W -1648.58 3.30 17911.53 90.21 311.42 3,528.39 1,587.23 S 12,237.83 W -1587.23 0.77 18004.86 90.97 311.64 3,527.43 1,525.36 S 12,307.69 W -1525.36 0.85 18098.11 89.37 310.47 3,527.16 1,464.12 S 12,378.00 W -1464.12 2.13 INSITE V7.4.20 Page 5Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 18191.47 87.66 309.99 3,529.58 1,403.84 S 12,449.25 W -1403.84 1.90 18284.92 87.97 309.79 3,533.14 1,343.95 S 12,520.90 W -1343.95 0.39 18378.20 88.12 310.23 3,536.32 1,284.02 S 12,592.31 W -1284.02 0.50 18471.48 87.66 310.78 3,539.76 1,223.47 S 12,663.18 W -1223.47 0.77 18564.86 87.98 310.90 3,543.31 1,162.45 S 12,733.78 W -1162.45 0.37 18658.26 87.60 310.59 3,546.91 1,101.53 S 12,804.49 W -1101.54 0.52 18751.82 87.12 310.30 3,551.22 1,040.91 S 12,875.61 W -1040.91 0.60 18845.22 86.36 310.74 3,556.53 980.32 S 12,946.50 W -980.32 0.94 18938.59 85.71 310.05 3,562.99 919.96 S 13,017.44 W -919.96 1.01 19031.79 87.07 310.39 3,568.85 859.90 S 13,088.46 W -859.90 1.50 19125.04 90.04 310.86 3,571.21 799.21 S 13,159.21 W -799.21 3.22 19218.59 89.85 309.91 3,571.30 738.60 S 13,230.46 W -738.60 1.04 19312.01 89.80 310.53 3,571.58 678.27 S 13,301.79 W -678.27 0.67 19405.24 90.50 312.31 3,571.34 616.60 S 13,371.70 W -616.60 2.05 19498.54 91.71 312.75 3,569.54 553.54 S 13,440.44 W -553.54 1.38 19591.91 87.80 311.88 3,569.94 490.70 S 13,509.47 W -490.70 4.29 19685.27 83.85 311.51 3,576.73 428.77 S 13,578.98 W -428.77 4.25 19778.70 87.45 311.47 3,583.82 367.07 S 13,648.76 W -367.07 3.85 19871.96 89.47 311.62 3,586.32 305.24 S 13,718.53 W -305.24 2.17 19965.21 91.79 311.44 3,585.30 243.42 S 13,788.33 W -243.42 2.50 20058.50 92.93 312.55 3,581.46 181.06 S 13,857.60 W -181.06 1.70 20151.82 91.10 312.51 3,578.18 118.02 S 13,926.32 W -118.02 1.96 20245.29 86.57 312.10 3,580.08 55.14 S 13,995.42 W -55.14 4.87 20338.71 85.62 311.62 3,586.44 7.06 N 14,064.83 W 7.06 1.14 20431.98 85.61 311.26 3,593.57 68.61 N 14,134.55 W 68.61 0.38 20525.33 88.26 312.23 3,598.56 130.66 N 14,204.09 W 130.66 3.02 20618.78 88.01 312.31 3,601.60 193.49 N 14,273.20 W 193.49 0.28 20712.16 88.14 311.58 3,604.74 255.87 N 14,342.62 W 255.87 0.79 20805.58 89.26 311.66 3,606.86 317.90 N 14,412.44 W 317.90 1.20 20898.92 91.03 311.99 3,606.62 380.14 N 14,481.99 W 380.14 1.93 20992.36 92.40 311.70 3,603.83 442.45 N 14,551.57 W 442.45 1.50 21085.79 93.27 311.08 3,599.21 504.15 N 14,621.57 W 504.15 1.14 21179.05 97.27 311.02 3,590.64 565.12 N 14,691.59 W 565.12 4.29 21272.36 101.32 311.02 3,575.57 625.54 N 14,761.05 W 625.54 4.34 21365.64 105.76 310.77 3,553.74 684.90 N 14,829.59 W 684.90 4.77 21458.95 108.98 311.18 3,525.89 743.29 N 14,896.82 W 743.29 3.48 21552.30 110.56 311.06 3,494.31 801.06 N 14,962.99 W 801.06 1.70 21645.64 111.64 310.62 3,460.71 858.01 N 15,028.87 W 858.01 1.24 21739.05 113.35 311.44 3,424.97 914.65 N 15,093.97 W 914.65 2.00 21749.75 113.40 311.37 3,420.73 921.15 N 15,101.34 W 921.15 0.76 21813.00 113.40 311.37 3,395.61 959.51 N 15,144.90 W 959.51 0.00 INSITE V7.4.20 Page 6Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report WELL INFORMATION Customer :Eni Petroleum Well Name :SP36-W5 L1 Job Number :AK-XX-0900577139 Rig Name :Doyon 15 Field Name :Nikaitchuq Country :USA Survey Report DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 40.57 0.00 0.00 40.57 0.00 N 0.00 E 0.00 0.00 79.86 0.60 288.64 79.86 0.07 N 0.19 W 0.07 1.53 119.60 0.68 279.83 119.60 0.17 N 0.62 W 0.17 0.32 124.31 0.86 277.26 124.31 0.18 N 0.69 W 0.18 3.89 133.21 0.78 273.99 133.21 0.19 N 0.81 W 0.19 1.04 143.13 0.61 266.62 143.12 0.20 N 0.93 W 0.20 1.93 153.18 0.38 236.25 153.17 0.17 N 1.01 W 0.17 3.40 162.88 0.36 188.01 162.87 0.13 N 1.05 W 0.13 3.12 183.44 0.87 162.94 183.43 0.09 S 1.01 W -0.09 2.75 193.03 1.18 165.42 193.02 0.25 S 0.96 W -0.25 3.26 204.76 1.53 166.67 204.75 0.52 S 0.90 W -0.52 2.99 214.53 1.90 168.34 214.51 0.81 S 0.83 W -0.81 3.82 224.41 2.18 168.06 224.39 1.15 S 0.76 W -1.15 2.84 234.64 2.59 169.49 234.61 1.57 S 0.68 W -1.57 4.05 263.85 3.54 176.29 263.78 3.12 S 0.50 W -3.12 3.48 295.43 4.79 177.99 295.27 5.41 S 0.39 W -5.41 3.98 326.22 5.44 187.18 325.94 8.14 S 0.53 W -8.14 3.39 358.64 5.43 192.89 358.21 11.16 S 1.06 W -11.16 1.67 388.02 6.01 197.03 387.45 13.99 S 1.82 W -13.99 2.42 449.10 7.91 198.98 448.08 21.02 S 4.13 W -21.02 3.13 541.98 11.58 201.63 539.60 35.73 S 9.64 W -35.73 3.98 634.91 13.57 201.81 630.30 54.53 S 17.13 W -54.53 2.14 728.11 17.88 200.32 719.99 78.11 S 26.17 W -78.11 4.64 821.36 21.90 198.81 807.66 108.01 S 36.75 W -108.01 4.35 914.91 25.48 197.54 893.31 143.72 S 48.44 W -143.72 3.87 972.32 27.29 196.58 944.74 168.11 S 55.92 W -168.11 3.24 1065.55 29.68 194.53 1,026.68 210.94 S 67.81 W -210.94 2.77 1158.85 31.40 193.85 1,107.03 256.91 S 79.43 W -256.91 1.88 1252.22 31.22 192.03 1,186.81 304.19 S 90.29 W -304.19 1.03 1345.58 35.22 190.04 1,264.90 354.39 S 100.03 W -354.39 4.44 1439.01 38.27 191.59 1,339.76 409.27 S 110.55 W -409.27 3.41 INSITE V7.4.20 Page 1Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 1532.27 36.51 192.89 1,413.85 464.61 S 122.54 W -464.61 2.07 1625.52 38.05 195.34 1,488.05 519.37 S 136.33 W -519.37 2.29 1718.81 42.61 197.53 1,559.15 577.25 S 153.46 W -577.25 5.12 1812.13 45.51 198.59 1,626.21 638.93 S 173.59 W -638.93 3.21 1905.60 44.58 198.23 1,692.25 701.69 S 194.48 W -701.69 1.03 1999.02 44.70 197.52 1,758.72 764.16 S 214.63 W -764.16 0.55 2093.12 50.09 197.35 1,822.40 830.22 S 235.37 W -830.22 5.73 2185.64 52.83 197.76 1,880.04 899.21 S 257.20 W -899.21 2.98 2279.09 54.21 198.94 1,935.60 970.52 S 280.86 W -970.52 1.79 2372.47 57.26 199.59 1,988.17 1,043.36 S 306.33 W -1043.36 3.32 2466.17 61.03 199.89 2,036.21 1,119.06 S 333.49 W -1119.06 4.03 2559.23 60.99 201.82 2,081.32 1,195.12 S 362.47 W -1195.12 1.81 2652.67 62.94 206.70 2,125.25 1,270.26 S 396.37 W -1270.26 5.06 2746.10 59.58 211.60 2,170.19 1,341.79 S 436.20 W -1341.79 5.84 2839.36 56.47 216.03 2,219.59 1,407.51 S 480.16 W -1407.51 5.23 2932.67 58.66 222.19 2,269.67 1,468.54 S 529.84 W -1468.54 6.04 3025.95 61.75 226.80 2,316.03 1,526.22 S 586.58 W -1526.22 5.42 3101.21 65.59 229.54 2,349.41 1,571.17 S 636.84 W -1571.17 6.06 3201.21 70.59 232.32 2,386.72 1,629.58 S 708.86 W -1629.59 5.63 3300.89 74.94 233.36 2,416.25 1,687.07 S 784.72 W -1687.07 4.48 3400.09 79.25 234.14 2,438.40 1,744.23 S 862.68 W -1744.23 4.41 3500.12 81.46 236.18 2,455.16 1,800.55 S 943.62 W -1800.55 2.99 3568.13 82.92 235.35 2,464.40 1,838.46 S 999.32 W -1838.46 2.46 3661.52 83.26 234.57 2,475.64 1,891.69 S 1,075.23 W -1891.69 0.91 3754.95 82.98 232.80 2,486.83 1,946.62 S 1,149.97 W -1946.62 1.90 3848.27 82.73 231.87 2,498.44 2,003.20 S 1,223.26 W -2003.20 1.02 3941.53 83.14 230.67 2,509.91 2,061.10 S 1,295.46 W -2061.10 1.35 4034.87 83.14 230.19 2,521.06 2,120.14 S 1,366.90 W -2120.14 0.51 4128.26 82.84 229.03 2,532.46 2,180.20 S 1,437.49 W -2180.20 1.27 4221.78 82.64 228.38 2,544.27 2,241.42 S 1,507.19 W -2241.42 0.72 4315.17 82.33 224.61 2,556.49 2,305.15 S 1,574.34 W -2305.15 4.02 4408.56 83.03 228.36 2,568.40 2,368.91 S 1,641.50 W -2368.91 4.05 4501.98 83.14 227.96 2,579.64 2,430.78 S 1,710.59 W -2430.78 0.44 4595.41 83.07 227.55 2,590.86 2,493.13 S 1,779.26 W -2493.13 0.44 4688.75 82.89 228.16 2,602.27 2,555.30 S 1,847.94 W -2555.30 0.68 4782.11 83.02 228.50 2,613.72 2,616.90 S 1,917.16 W -2616.90 0.39 4875.57 82.98 228.35 2,625.11 2,678.45 S 1,986.55 W -2678.46 0.16 4969.02 83.23 228.47 2,636.33 2,740.04 S 2,055.94 W -2740.04 0.30 5062.44 82.97 228.63 2,647.55 2,801.43 S 2,125.45 W -2801.43 0.33 5155.83 83.16 229.06 2,658.83 2,862.44 S 2,195.25 W -2862.44 0.50 5249.27 83.26 229.11 2,669.87 2,923.21 S 2,265.37 W -2923.21 0.12 5342.98 82.75 229.00 2,681.29 2,984.16 S 2,335.63 W -2984.16 0.56 5436.09 83.49 229.61 2,692.44 3,044.44 S 2,405.71 W -3044.44 1.03 5529.50 82.75 229.92 2,703.63 3,104.34 S 2,476.51 W -3104.34 0.86 5622.89 83.11 229.47 2,715.12 3,164.29 S 2,547.18 W -3164.29 0.61 INSITE V7.4.20 Page 2Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 5716.30 83.22 229.48 2,726.24 3,224.55 S 2,617.68 W -3224.55 0.12 5809.69 83.19 228.93 2,737.29 3,285.14 S 2,687.89 W -3285.14 0.59 5903.05 82.88 229.55 2,748.61 3,345.64 S 2,758.08 W -3345.64 0.74 5996.51 83.05 229.59 2,760.06 3,405.80 S 2,828.69 W -3405.80 0.19 6089.93 81.99 229.46 2,772.22 3,465.92 S 2,899.14 W -3465.92 1.14 6183.28 82.21 229.79 2,785.05 3,525.82 S 2,969.59 W -3525.82 0.42 6276.69 82.27 230.00 2,797.66 3,585.44 S 3,040.38 W -3585.44 0.23 6370.12 81.99 230.65 2,810.46 3,644.53 S 3,111.61 W -3644.53 0.75 6463.54 82.10 231.08 2,823.38 3,702.92 S 3,183.37 W -3702.92 0.47 6556.97 81.87 231.70 2,836.41 3,760.65 S 3,255.67 W -3760.66 0.70 6650.37 82.12 231.68 2,849.42 3,817.99 S 3,328.24 W -3817.99 0.27 6743.79 82.17 232.56 2,862.19 3,874.81 S 3,401.29 W -3874.81 0.93 6837.25 82.50 233.41 2,874.65 3,930.57 S 3,475.24 W -3930.57 0.97 6930.75 82.72 233.74 2,886.68 3,985.63 S 3,549.85 W -3985.63 0.42 7024.07 82.24 234.09 2,898.89 4,040.12 S 3,624.62 W -4040.12 0.63 7117.46 82.66 233.68 2,911.16 4,094.69 S 3,699.41 W -4094.69 0.63 7210.85 82.40 233.98 2,923.30 4,149.34 S 3,774.16 W -4149.34 0.42 7304.31 82.43 233.82 2,935.64 4,203.92 S 3,849.01 W -4203.92 0.17 7397.70 82.56 233.41 2,947.84 4,258.85 S 3,923.55 W -4258.85 0.46 7491.12 82.52 233.38 2,959.97 4,314.08 S 3,997.91 W -4314.08 0.05 7584.50 82.49 232.60 2,972.15 4,369.81 S 4,071.84 W -4369.81 0.83 7677.93 82.56 233.01 2,984.30 4,425.81 S 4,145.63 W -4425.81 0.44 7771.52 82.49 232.22 2,996.48 4,482.15 S 4,219.36 W -4482.16 0.84 7864.88 82.46 231.75 3,008.70 4,539.16 S 4,292.28 W -4539.16 0.50 7958.35 82.59 231.07 3,020.86 4,596.96 S 4,364.72 W -4596.96 0.73 8051.72 82.49 231.02 3,032.99 4,655.17 S 4,436.72 W -4655.17 0.12 8145.13 83.35 231.28 3,044.50 4,713.32 S 4,508.91 W -4713.32 0.96 8238.46 82.72 231.20 3,055.82 4,771.31 S 4,581.15 W -4771.31 0.68 8330.13 83.14 230.93 3,067.10 4,828.48 S 4,651.91 W -4828.49 0.54 8425.04 83.07 230.57 3,078.49 4,888.10 S 4,724.88 W -4888.10 0.38 8518.40 83.01 230.67 3,089.81 4,946.90 S 4,796.51 W -4946.90 0.12 8611.85 83.07 230.49 3,101.13 5,005.80 S 4,868.17 W -5005.80 0.20 8705.13 83.07 230.21 3,112.39 5,064.89 S 4,939.46 W -5064.89 0.30 8798.41 83.07 231.87 3,123.64 5,123.11 S 5,011.46 W -5123.11 1.77 8891.79 82.80 230.29 3,135.13 5,181.33 S 5,083.56 W -5181.33 1.70 8985.19 82.80 229.73 3,146.83 5,240.88 S 5,154.56 W -5240.88 0.59 9078.75 83.20 229.05 3,158.24 5,301.32 S 5,225.05 W -5301.32 0.84 9172.15 82.03 229.62 3,170.24 5,361.68 S 5,295.31 W -5361.68 1.39 9265.52 82.67 228.78 3,182.67 5,422.14 S 5,365.36 W -5422.15 1.12 9358.72 82.64 229.13 3,194.59 5,482.84 S 5,435.07 W -5482.84 0.37 9451.97 82.78 228.76 3,206.42 5,543.59 S 5,504.82 W -5543.59 0.42 9545.52 83.44 228.70 3,217.64 5,604.85 S 5,574.63 W -5604.85 0.71 9636.18 82.35 232.41 3,228.86 5,662.00 S 5,644.09 W -5662.00 4.23 9729.41 81.11 234.84 3,242.27 5,716.72 S 5,718.36 W -5716.72 2.90 9822.71 81.57 237.99 3,256.32 5,767.73 S 5,795.19 W -5767.73 3.37 INSITE V7.4.20 Page 3Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 9916.08 81.17 242.13 3,270.34 5,813.79 S 5,875.16 W -5813.79 4.40 10009.44 81.25 245.30 3,284.61 5,854.65 S 5,957.88 W -5854.65 3.36 10102.87 81.63 248.72 3,298.52 5,890.72 S 6,042.92 W -5890.72 3.64 10196.13 82.27 253.13 3,311.59 5,920.89 S 6,130.16 W -5920.89 4.73 10289.38 82.35 258.37 3,324.07 5,943.63 S 6,219.70 W -5943.63 5.57 10382.67 82.67 264.31 3,336.24 5,957.55 S 6,311.10 W -5957.55 6.32 10475.99 82.87 269.60 3,348.00 5,962.46 S 6,403.51 W -5962.46 5.63 10569.46 83.24 272.09 3,359.30 5,961.09 S 6,496.28 W -5961.09 2.67 10662.88 83.70 274.15 3,369.93 5,956.04 S 6,588.95 W -5956.04 2.25 10756.15 84.22 275.97 3,379.74 5,947.86 S 6,681.33 W -5947.86 2.02 10849.50 84.54 278.16 3,388.88 5,936.44 S 6,773.52 W -5936.44 2.36 10942.95 84.45 279.66 3,397.85 5,922.03 S 6,865.42 W -5922.03 1.60 11036.33 84.56 281.62 3,406.79 5,904.87 S 6,956.77 W -5904.87 2.09 11129.75 84.28 283.97 3,415.88 5,884.28 S 7,047.43 W -5884.28 2.52 11223.09 84.54 286.50 3,424.97 5,859.87 S 7,137.05 W -5859.87 2.71 11316.53 84.48 288.40 3,433.91 5,831.98 S 7,225.78 W -5831.98 2.03 11409.96 84.59 290.04 3,442.81 5,801.36 S 7,313.60 W -5801.36 1.75 11437.00 84.39 290.76 3,445.41 5,791.98 S 7,338.82 W -5791.98 2.75 11454.00 84.42 288.70 3,447.06 5,786.27 S 7,354.75 W -5786.27 12.06 11482.40 84.47 289.62 3,449.81 5,776.99 S 7,381.45 W -5776.99 3.23 11577.41 82.73 289.85 3,460.40 5,745.11 S 7,470.32 W -5745.11 1.85 11652.98 83.99 290.32 3,469.14 5,719.33 S 7,540.81 W -5719.33 1.78 11746.39 86.53 292.20 3,476.86 5,685.58 S 7,627.56 W -5685.58 3.38 11839.75 86.71 294.41 3,482.37 5,648.71 S 7,713.15 W -5648.71 2.37 11924.90 87.12 297.68 3,486.95 5,611.38 S 7,789.53 W -5611.38 3.86 12026.38 87.31 302.18 3,491.88 5,560.82 S 7,877.35 W -5560.82 4.43 12119.73 86.27 304.85 3,497.11 5,509.37 S 7,955.05 W -5509.37 3.07 12213.33 85.93 308.71 3,503.48 5,453.47 S 8,029.83 W -5453.47 4.13 12306.36 85.91 311.45 3,510.10 5,393.73 S 8,100.82 W -5393.73 2.94 12399.71 87.00 312.97 3,515.87 5,331.13 S 8,169.83 W -5331.13 2.00 12493.07 87.66 314.39 3,520.22 5,266.73 S 8,237.27 W -5266.73 1.68 12586.44 90.18 315.18 3,521.98 5,200.97 S 8,303.52 W -5200.97 2.83 12679.91 91.05 313.90 3,520.98 5,135.41 S 8,370.14 W -5135.41 1.66 12773.23 90.78 312.65 3,519.49 5,071.45 S 8,438.07 W -5071.45 1.37 12866.55 90.11 311.52 3,518.76 5,008.91 S 8,507.33 W -5008.91 1.41 12959.81 89.76 310.03 3,518.87 4,948.00 S 8,577.95 W -4948.01 1.64 13053.20 89.77 309.84 3,519.25 4,888.06 S 8,649.56 W -4888.06 0.20 13146.71 89.72 308.99 3,519.67 4,828.69 S 8,721.80 W -4828.69 0.91 13240.13 90.82 310.20 3,519.23 4,769.15 S 8,793.78 W -4769.15 1.75 13333.50 90.80 309.85 3,517.91 4,709.10 S 8,865.28 W -4709.10 0.38 13426.95 90.81 309.29 3,516.59 4,649.58 S 8,937.30 W -4649.58 0.60 13520.35 90.23 308.77 3,515.75 4,590.77 S 9,009.86 W -4590.77 0.83 13613.71 90.84 308.55 3,514.88 4,532.45 S 9,082.75 W -4532.45 0.69 13707.06 90.97 308.58 3,513.40 4,474.26 S 9,155.73 W -4474.26 0.14 13800.48 89.82 308.28 3,512.76 4,416.20 S 9,228.91 W -4416.20 1.27 INSITE V7.4.20 Page 4Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 13893.96 89.00 308.93 3,513.72 4,357.87 S 9,301.96 W -4357.88 1.12 13987.35 86.64 309.06 3,517.27 4,299.16 S 9,374.49 W -4299.16 2.53 14080.78 88.00 311.63 3,521.64 4,238.74 S 9,445.61 W -4238.74 3.11 14174.20 87.65 313.24 3,525.19 4,175.75 S 9,514.50 W -4175.75 1.76 14267.61 89.16 313.14 3,527.79 4,111.85 S 9,582.58 W -4111.85 1.62 14361.04 89.86 314.24 3,528.59 4,047.32 S 9,650.13 W -4047.32 1.40 14454.46 90.44 314.23 3,528.34 3,982.15 S 9,717.07 W -3982.15 0.62 14547.87 90.34 312.91 3,527.71 3,917.77 S 9,784.74 W -3917.77 1.42 14641.24 92.27 313.94 3,525.58 3,853.61 S 9,852.53 W -3853.61 2.34 14734.62 89.88 313.02 3,523.83 3,789.37 S 9,920.27 W -3789.37 2.74 14827.98 90.33 312.35 3,523.66 3,726.07 S 9,988.90 W -3726.07 0.86 14921.43 89.88 311.47 3,523.48 3,663.65 S 10,058.45 W -3663.65 1.06 15014.87 89.73 310.77 3,523.80 3,602.20 S 10,128.84 W -3602.20 0.77 15108.26 90.27 311.32 3,523.80 3,540.88 S 10,199.27 W -3540.88 0.83 15201.60 90.28 311.22 3,523.35 3,479.31 S 10,269.43 W -3479.31 0.11 15295.10 90.27 312.23 3,522.91 3,417.08 S 10,339.21 W -3417.09 1.08 15388.50 90.88 312.21 3,521.97 3,354.33 S 10,408.37 W -3354.33 0.65 15481.94 91.76 311.67 3,519.82 3,291.89 S 10,477.86 W -3291.89 1.10 15575.28 93.00 311.82 3,515.94 3,229.80 S 10,547.44 W -3229.80 1.34 15668.74 91.68 312.49 3,512.12 3,167.13 S 10,616.66 W -3167.13 1.58 15762.19 91.96 312.57 3,509.16 3,103.99 S 10,685.49 W -3103.99 0.31 15855.66 91.58 313.56 3,506.27 3,040.20 S 10,753.75 W -3040.20 1.13 15949.06 91.90 313.81 3,503.43 2,975.72 S 10,821.26 W -2975.72 0.43 16042.40 91.62 314.53 3,500.57 2,910.71 S 10,888.18 W -2910.71 0.83 16135.78 89.30 314.35 3,499.82 2,845.34 S 10,954.84 W -2845.34 2.49 16229.23 90.19 314.12 3,500.23 2,780.15 S 11,021.80 W -2780.15 0.98 16322.66 90.24 312.86 3,499.88 2,715.85 S 11,089.58 W -2715.85 1.35 16416.06 90.80 311.86 3,499.03 2,652.92 S 11,158.59 W -2652.92 1.23 16509.46 90.26 312.57 3,498.17 2,590.17 S 11,227.76 W -2590.17 0.96 16602.82 88.30 311.62 3,499.34 2,527.59 S 11,297.03 W -2527.59 2.33 16696.42 87.07 310.33 3,503.12 2,466.27 S 11,367.63 W -2466.27 1.90 16789.87 86.38 309.85 3,508.46 2,406.18 S 11,439.01 W -2406.18 0.90 16883.29 88.20 308.84 3,512.88 2,347.03 S 11,511.17 W -2347.03 2.23 16976.72 89.84 308.53 3,514.48 2,288.64 S 11,584.09 W -2288.64 1.79 17070.03 90.92 309.71 3,513.86 2,229.77 S 11,656.48 W -2229.77 1.71 17163.46 89.27 309.30 3,513.70 2,170.34 S 11,728.56 W -2170.34 1.82 17256.79 88.37 310.25 3,515.63 2,110.64 S 11,800.28 W -2110.64 1.40 17350.06 87.44 309.92 3,519.04 2,050.62 S 11,871.59 W -2050.62 1.06 17443.37 87.25 310.84 3,523.36 1,990.24 S 11,942.59 W -1990.24 1.01 17536.79 87.26 311.07 3,527.83 1,929.07 S 12,013.06 W -1929.07 0.25 17630.10 86.97 310.55 3,532.53 1,868.17 S 12,083.60 W -1868.17 0.64 17723.83 87.78 311.20 3,536.82 1,806.90 S 12,154.39 W -1806.90 1.11 17816.73 88.08 311.06 3,540.18 1,745.83 S 12,224.32 W -1745.83 0.36 17910.10 90.53 311.40 3,541.31 1,684.30 S 12,294.53 W -1684.30 2.65 18003.62 92.27 312.72 3,539.03 1,621.67 S 12,363.94 W -1621.67 2.34 INSITE V7.4.20 Page 5Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 18097.09 90.79 313.68 3,536.53 1,557.71 S 12,432.05 W -1557.71 1.89 18190.46 90.01 313.60 3,535.88 1,493.28 S 12,499.62 W -1493.28 0.84 18283.73 89.98 314.28 3,535.89 1,428.56 S 12,566.78 W -1428.56 0.73 18377.04 90.87 315.08 3,535.19 1,362.95 S 12,633.13 W -1362.95 1.28 18470.42 92.93 316.87 3,532.10 1,295.85 S 12,697.98 W -1295.85 2.92 18563.84 91.84 315.52 3,528.21 1,228.49 S 12,762.59 W -1228.49 1.86 18657.19 90.20 315.73 3,526.55 1,161.78 S 12,827.86 W -1161.78 1.77 18750.47 88.81 313.21 3,527.35 1,096.44 S 12,894.42 W -1096.44 3.09 18843.80 89.70 310.53 3,528.57 1,034.16 S 12,963.90 W -1034.16 3.03 18937.17 89.67 310.68 3,529.08 973.39 S 13,034.79 W -973.39 0.16 19030.53 90.25 310.11 3,529.15 912.89 S 13,105.89 W -912.89 0.87 19123.88 89.93 310.80 3,529.00 852.32 S 13,176.92 W -852.32 0.81 19217.13 87.54 312.76 3,531.06 790.22 S 13,246.44 W -790.22 3.31 19310.43 86.71 311.19 3,535.74 727.90 S 13,315.71 W -727.90 1.90 19403.75 84.63 310.74 3,542.78 666.89 S 13,385.97 W -666.89 2.28 19497.16 86.91 311.43 3,549.67 605.68 S 13,456.18 W -605.68 2.55 19591.09 86.52 309.70 3,555.06 544.70 S 13,527.41 W -544.70 1.89 19683.95 89.07 308.73 3,558.63 486.04 S 13,599.30 W -486.04 2.94 19777.19 89.79 310.40 3,559.56 426.65 S 13,671.17 W -426.65 1.95 19870.63 87.11 310.28 3,562.08 366.20 S 13,742.36 W -366.20 2.87 19964.02 87.33 309.83 3,566.61 306.17 S 13,813.76 W -306.17 0.54 20057.42 87.98 309.51 3,570.44 246.60 S 13,885.59 W -246.60 0.78 20150.84 92.10 310.67 3,570.37 186.45 S 13,957.05 W -186.45 4.58 20244.25 91.70 310.48 3,567.27 125.72 S 14,027.96 W -125.72 0.47 20337.64 90.84 310.97 3,565.20 64.81 S 14,098.71 W -64.81 1.06 20430.95 88.23 310.77 3,565.96 3.76 S 14,169.27 W -3.76 2.81 20524.26 89.72 310.01 3,567.63 56.69 N 14,240.32 W 56.69 1.79 20617.55 92.84 312.02 3,565.55 117.89 N 14,310.68 W 117.89 3.98 20710.85 92.76 313.70 3,560.99 181.27 N 14,378.99 W 181.27 1.80 20804.17 97.40 313.99 3,552.73 245.64 N 14,446.01 W 245.64 4.98 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 20,804.17 feet is 14,448.10 feet along 270.97 degrees (Grid) INSITE V7.4.20 Page 6Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report