HomeMy WebLinkAbout213-082STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________NIKAITCHUQ SP36-W5
JBR 03/18/2025
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:0
Tested with 4 1/2" test joint. Precharge Bottles = 36 all at 1000psi each. Good Test
Test Results
TEST DATA
Rig Rep:S. Lawrence / C. SmithOperator:Hilcorp Alaska, LLC Operator Rep:T. Kruger / M. Smith
Rig Owner/Rig No.:Doyon 15 PTD#:2130820 DATE:2/2/2025
Type Operation:WRKOV Annular:
250/2500Type Test:INIT
Valves:
250/5000
Rams:
250/5000
Test Pressures:Inspection No:bopBDB250203063109
Inspector Brian Bixby
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 5
MASP:
1079
Sundry No:
324-686
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
FSV Misc 0 NA
15 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 13 5/8 P
#1 Rams 1 3 1/2x6 P
#2 Rams 1 Blind/Shear P
#3 Rams 1 3 1/2x6 P
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3 1/8 P
HCR Valves 2 3 1/8 P
Kill Line Valves 1 3 1/8 P
Check Valve 0 NA
BOP Misc 0 NA
System Pressure P3050
Pressure After Closure P2320
200 PSI Attained P10
Full Pressure Attained P36
Blind Switch Covers:PYES
Bottle precharge P
Nitgn Btls# &psi (avg)P10@4100
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
0 NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P20
#1 Rams P8
#2 Rams P8
#3 Rams P8
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P2
HCR Kill P2
9
9
9
99
9 999
9
P.I. Supv
Comm:
Rig Coil Tubing Unit? No
Rig Contractor Rig Representative
Operator Operator Representative
Well Permit to Drill # 2130820 Sundry Approval # 324-686
Operation Inspection Location
Working Pressure, W/H Flange P Pit Fluid Measurement P Working Pressure P
P Flow Rate Sensor P Operating Pressure P
P Mud Gas Separator P Fluid Level/Condition P
P Degasser P Pressure Gauges P
P Separator Bypass P Sufficient Valves P
P Gas Detectors P Regulator Bypass P
P Alarms Separate/Distinct P Actuators (4-way valves) P
P Choke/Kill Line Connections P Blind Ram Handle Cover P
P Reserve Pits P Control Panel, Driller P
P Trip Tank P Control Panel, Remote P
PFirewallP
P 2 or More Pumps P
P Kelly or TD Valves P Independent Power Supply P
P Floor Safety Valves P N2 Backup P
P Driller's Console P Condition of Equipment P
P Flow Monitor P
Flow Rate Indicator P
Pit Level Indicators P Valves P
PPE P Gauges P Remote Hydraulic Choke P
Well Control Trained P Gas Detection Monitor P FOV Upstream of Chokes P
Housekeeping P Hydraulic Control Panel P Targeted Turns P
Well Control Plan P Kill Sheet Current P Bypass Line P
FAILURES:0 CORRECT BY:
COMMENTS
Brian Bixby
2/2/2025INSPECT DATE
AOGCC INSPECTOR
Doyon 15
Doyon
Hilcorp North Slope LLC
MISCELLANEOUS
Flange/Hub Connections
Drilling Spool Outlets
Flow Nipple
Control Lines
RIG FLOOR
ALASKA OIL AND GAS CONSERVATION COMMISSION
RIG INSPECTION REPORT
HCR Valve(s)
Manual Valves
Annular Preventer
Working Pressure, BOP Stack
Stack Anchored
Choke Line
Kill Line
Targeted Turns
Pipe Rams
Blind Rams
T. Kruger / M. Smith
S. Lawrence / C. Smith
Locking Devices, Rams
BOP STACK
Initial Test was to 5000psi. GOOD Test
CHOKE MANIFOLD
Spy Island
MUD SYSTEM
Nikaitchuq SP36-W5
Workover
CLOSING UNIT
2025-0202_Rig_Doyon15_Nikaitchuq_SP36-W5_bb rev. 4-19-2023
9
9
99 9
9
-5HJJ
1
Gluyas, Gavin R (OGC)
From:Lau, Jack J (OGC)
Sent:Monday, December 9, 2024 11:21 AM
To:AOGCC Records (CED sponsored)
Subject:FW: [EXTERNAL] NIK_SP36-W5 (213-082)
From: Keith Lopez <keith.lopez@hilcorp.com>
Sent: Monday, December 9, 2024 10:30 AM
To: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Cc: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>; Keith Lopez <Keith.Lopez@hilcorp.com>
Subject: RE: [EXTERNAL] NIK_SP36-W5 (213-082)
Sorry about the error in the procedure. We do plan on using injection water as our kill fluid (which is our
recycled produced water, SG 1.02, ~8.5 ppg). We are using our worst-case scenario with our well
building to 1,400 psi and only gas from formation to surface. Currently, the intake pressure is building
but is only at 1,094 psi and rising 8 psi per day. We will have the ability to weight up our injection water if
we need heavier kill fluid. Please let me know if you have additional questions. Thanks
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
2
Keith Lopez
Operations Engineer – Western North Slope
Office: 907-777-8438
Cell: 907-903-5432
keith.lopez@hilcorp.com
From: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Sent: Friday, December 6, 2024 3:45 PM
To: Keith Lopez <keith.lopez@hilcorp.com>
Cc: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>
Subject: [EXTERNAL] NIK_SP36-W5 (213-082)
Keith –
Looking at the sundry app for NIK_SP36-W5 (213-082), the KWF should be 8.4 ppg, but the beginning of
the program uses injection water as the kill fluid which I assume is 8.33 ppg (<8.4 ppg). then later in the
program calls for 8.6 ppg 3% KCl/NaCl. Please clarify.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
3
Thanks
Jack Lau
Senior Petroleum Engineer
Alaska Oil and Gas Conservation Commission
(907) 793-1244 OƯice
(907) 227-2760 Cell
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2.Operator Name: 4.Current Well Class:5.Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9.Property Designation (Lease Number):10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
21,813 NA
Casing Collapse
Conductor NA
Surface 2,260psi
Intermediate 3,090psi
Slotted Liner NA
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Keith Lopez
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0388574, ADL0388575, ADL0388577, ADL0391283
213-082
C.O. 639 NIKAITCHUQ SP36-W5
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-629-23492-00-00
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,396 21,130 3,596 1,079
SCHRADER BLUFF OIL SCHRADER BLUFF OIL
160' 160'
12.6# / L-80
TVD Burst
9,456'
MD
NA
NA
12,390'
5,020psi
5,750psi
2,453'
3,507'
3,596'
3,470'
12,390'
Slotted Liner
160' 20"
13-3/8"
9-5/8"
3,470'
5-1/2"9,597'
Slotted Liner
907-777-8438
keith.lopez@hilcorp.com
Operations Manager
January 15, 2025
4-1/2"
Perforation Depth MD (ft):
NIKAITCHUQ
SLXP Liner Hanger Packer, seven oil swell packers, and NA 11,219' MD/3,426' TVD, see schematic for swell packers, and NA
NA
21,130'
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 4:07 pm, Dec 05, 2024
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2024.12.05 15:55:17 -
09'00'
Sara Hannegan
(2519)
324-686
Witnessed BOP test to 3500 psi, Annular to 2500 psi.
A.Dewhurst 06DEC24
10-404
JJL 12/9/24
X
DSR-12/16/24*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2024.12.17 10:23:19 -09'00'12/17/24
RBDMS JSB 121824
Well: SP-36
PTD: 213-082
API: 50-629-23492-00-00
Well Name:SP-36 API Number:50-629-23492-00-00
Current Status:Producer Rig:Doyon 15
Estimated Start Date:01/15/25 Estimated Duration:8 days
Regulatory Contact:Darci Horner Permit to Drill Number:212-082
First Call Engineer:Keith Lopez (907) 777-8438 (O) (907) 903-5432 (M)
Second Call Engineer:Sara Hannegan (907) 564-4624 (O) (907) 309-1196 (M)
Current Bottom Hole Pressure: 1,400 psi @ 3,207’ TVD |8.4 PPGE
Max Potential Surface Pressure: 1,079 psi Gas Column Gradient (0.1 psi/ft)
Max Angle: 83° Sail Angle from 3,470’ MD to ESP setting depth of 9,400’ MD
Brief Well Summary:
SP36 was drilled and completed in August 2013 as a Schrader Bluff OA producer with an ESP completion. In
2023, a failed ESP was pulled from the well and a lower 3-1/2” completion was installed to increase the velocity
of the produced fluid and reduce sand accumulation. The current ESP had a 1.5 year run life and appears to
have parted the shaft.
Objectives:
Pull ESP completion and run new ESP completion.
Notes Regarding Wellbore Condition:
x Casing test from 10,080’ MD to 2,000 psi passed on 5/21/2023.
Pre-Rig Procedure (Non Sundried Work)
Operations:
1. Bleed off gas cap from IA before the rig move to the well
Brief RWO Procedure (Begin Sundried Work)
1. MIRU Doyon 15 WO Rig, ancillary equipment, and lines.
2. Displace corrosion inhibitor from capillary line prior to pulling ESP.
3. Kill well by bullheading the tubing string and the IA.
a. Pump 130% tubing volume (186 bbls) of injection water inhibited with biocide.
b. Pump 130% annulus volume (686 bbls) of injection water inhibited with biocide.
c. Monitor OA annulus during kill.
4. Flow check for 30 min to ensure the well is killed.
5. Install BPV inside tubing hanger as per Vault.
6. Nipple down X-mas tree.
7. Make up blanking plug on top of tubing hanger as per Vault procedure.
8. Nipple up BOP.
9. Run 4-1/2”, and 2-7/8” test joint and engage tubing hanger blanking plug.
a. Perform full BOP pressure test to 250/3,500 psi (notify AOGCC 48 hours prior to BOP test).
Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
10. Pull 4-1/2” test joint with blanking plug.
Well: SP-36
PTD: 213-082
API: 50-629-23492-00-00
11. Pull BPV from the tubing hanger per Vault procedure.
12. Call out Centrilift to pull ESP and pull tubing hanger.
13. RU tubing handling equipment.
14. Pump approximately 10 bbl/hour (+ pipe displacement while pulling pipe) of 8.6 ppg 3% KCl/NaCl
brine down the annulus throughout the operations to maintain well fill.
15. POOH with 4-1/2” ESP completion standing back tubing and laying down ESP. Record number of
clamps recovered.
16. RIH with 4-1/2” 12.25# L-80 TK-15XT and ESP completion to +/- 9,394’ with duel encapsulated
capillary strings.
a. Check electrical continuity every 1000’.
b. Note PU and SO weights on tally.
c. Install ESP clamps per Baker, and cross coupling clamps every other joint
17. Land tubing hanger. Use extra caution to not damage cable.
18. Lay down landing joint.
19. Set BPV.
20. ND BOPE and NU tree.
21. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV.
22. RDMO Doyon 15.
Attachments:
1. Current Wellbore Schematic
2. Proposed Wellbore Schematic
3. BOPE Schematic
4-½” L80 12.6# W563 TKXT15Production TubingHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producerwith conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc.Nose Guide ShoeAs CompletedMay 2023 Resman Oil/Water TracerSub #1 Interm. Casing9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD,3,457' TVD -Baker SLXPLiner Hanger/PackerSurf. Casing13-3/8", 68 #3,470' MD, 2,453'TVD81º Inc.4 ½ Swivel Joint 11,219' MD, 3426'TVD – L1 - BakerSLXP LinerHanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe withBent JointHAL 5-½” Oil SwellPacker11,437-11,454' MD,Planned Casing ExitWindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568'TVD89º Inc. Resman Oil/Water Tracer Sub#2 Resman Oil/Water TracerSub #3Item MD (ft)Resman tracer Sub #1 - ROS 683 / RWS 751 12371Resman tracer Sub #2 - ROS 682 / RWS 750 12419Resman tracer Sub #3 - ROS 681 / RWS 749 11304Item MD (ft)5-1/2" Swell Pkr #1 210875-1/2" Swell Pkr #2 202265-1/2" Swell Pkr #3 186695-1/2" Swell Pkr #4 175325-1/2" Swell Pkr #5 168615-1/2" Swell Pkr #6 152305-1/2" Swell Pkr #7 14039Item L1 MD (ft)5-1/2" Swell Pkr #1 192835-1/2" Swell Pkr #2 179805-1/2" Swell Pkr #3 167145-1/2" Swell Pkr #4 155835-1/2" Swell Pkr #5 139925-1/2" Swell Pkr #6 123635-1/2" Swell Pkr #7 11493TD20870'MD/3546'TVDTD21813'MD/3396'TVDVelocity String: PHL Packer 10' pup of 4-½” tubing,XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD9,456' MD, 3,207' TVD, 83° Inc, - Bottom Motor cenetralizerCentrilift conventional ESP, 66 Stages Flex 47 GS3 Seals,562XP motor9394' MD / 3199' TVD Discharge GaugeDate Activity8/18/2013Drill and Complete with TTC-ESP12/15/2013Pull TTC-ESP and replace withconventional ESP4/25/2019Pull ESP due to electricalfailure and replace withconventional ESP5/26/2023Pull ESP due to ESP failure,run 3.5" middle and 4.5"upper completion andreplace with conventional ESPWell History
4-½” L80 12.6# TK-15XTProduction TubingHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producerwith conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc.Nose Guide ShoeProposedDec 2024 Resman Oil/Water TracerSub #1 Interm. Casing9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD,3,457' TVD -Baker SLXPLiner Hanger/PackerSurf. Casing13-3/8", 68 #3,470' MD, 2,453'TVD81º Inc. 11,219' MD, 3426'TVD – L1 - BakerSLXP LinerHanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe withBent JointHAL 5-½” Oil SwellPacker11,437-11,454' MD,Planned Casing ExitWindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568'TVD89º Inc. Resman Oil/Water Tracer Sub#2 Resman Oil/Water TracerSub #3Item MD (ft)Resman tracer Sub #1 - ROS 683 / RWS 751 12371Resman tracer Sub #2 - ROS 682 / RWS 750 12419Resman tracer Sub #3 - ROS 681 / RWS 749 11304Item MD (ft)5-1/2" Swell Pkr #1 210875-1/2" Swell Pkr #2 202265-1/2" Swell Pkr #3 186695-1/2" Swell Pkr #4 175325-1/2" Swell Pkr #5 168615-1/2" Swell Pkr #6 152305-1/2" Swell Pkr #7 14039Item L1 MD (ft)5-1/2" Swell Pkr #1 192835-1/2" Swell Pkr #2 179805-1/2" Swell Pkr #3 167145-1/2" Swell Pkr #4 155835-1/2" Swell Pkr #5 139925-1/2" Swell Pkr #6 123635-1/2" Swell Pkr #7 11493TD20870'MD/3546'TVDTD21813'MD/3396'TVDVelocity String: PHL Packer 10' pup of 4-½” tubing,XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD~9,456' MD, ~3,207' TVD, 83° Inc, - Bottom Motor centralizerCentrilift conventional ESP~9394' MD / ~3199' TVD Discharge GaugeDate Activity8/18/2013Drill and Complete with TTC-ESP12/15/2013Pull TTC-ESP and replace withconventional ESP4/25/2019Pull ESP due to electricalfailure and replace withconventional ESP5/26/2023Pull ESP due to ESP failure,run 3.5" middle and 4.5"upper completion andreplace with conventional ESPWell History
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: _ESP Changeout___
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number):8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 21813 feet N/A feet
true vertical 3386 feet N/A feet
Effective Depth measured 21130 feet 9476 feet
true vertical 3596 feet 3209 feet
Perforation depth Measured depth 12390-21130 feet
True Vertical depth 3507-3596 feet
Tubing (size, grade, measured and true vertical depth)4.5"L-80 9394' 3199'
Packers and SSSV (type, measured and true vertical depth)Halliburton PHL 9476' 3209'
12. Stimulation or cement squeeze summary:N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:Schrader Bluff
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and Giorgio Iannucci
Digital Signature with Date:6/9/2023 Contact Name:Amjad Chaudhry
Contact Email:amjad.chaudhry@eni.com
Authorized Title:Well Operations Project Manager Contact Phone:907-865-3379
323-192
Sr Pet Eng:
Slotted
Sr Pet Geo:Sr Res Eng:
WINJ WAG
14
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Gas-Mcf
MD
127
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
1110 10935
210 1461422
151
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
488
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
0391283, 0388577, 0388574, 0388575
Nikaitchuq Schrader Bluff Oil Pool
Eni US Operating Co. Inc.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
213-082
50-629-23492-00-00
3700 Centerpoint Drive, Ste. 500, Anchorage, AK
99503
3. Address:
SP36-W5
Length
160
3470
160Conductor
Surface
Intermediate
20"
13.375"
Size
160
9.625"
Slotted
5210
6890
measured
TVD
Production
Liner
12390
9597
Casing
Structural
3507
5.5"
12390
21130 3596
Plugs
Junk measured
3470 2453
Burst Collapse
2480
4790
p
k
ft
t
Fra
O
s
213
6. A
G
L
PG
,
_
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
annucci
By Grace Christianson at 9:09 am, Jun 13, 2023
DSR-6/13/23
RBDMS JSB 071423
4-½” L80 12.6# W563 TKXT15 Production TubingHAL 5-½” Oil Swell Packer4-½” x-cplg cable clamps, for ESP Power Cable, (1) 3/8" Chem Inj LineSP36-W5Dual Lateral Producer with conventional ESPNikaitchuq Field –Spy Island5-½” Silver Bullet Ecc. Nose Guide ShoeAs CompletedMay 2023 Resman Oil/Water Tracer Sub #1 Interm. Casing 9-5/8", 40# 12,390' MD, 3,507' TVD87º Inc.Slotted Liner,5-½” 15.5 ppf21,130' MD, 3,596' TVD95º Inc. 11,533' MD, 3,457' TVD - Baker SLXP Liner Hanger/PackerSurf. Casing13-3/8", 68 # 3,470' MD, 2,453' TVD81º Inc.4 ½ Swivel Joint 11,219' MD, 3426' TVD – L1 - Baker SLXP Liner Hanger/Packer5-½” Silver Bullet Ecc. Nose Guide Shoe with Bent JointHAL 5-½” Oil Swell Packer11,437-11,454' MD, Planned Casing Exit WindowSlotted Liner,5-½” 15.5 ppf20,651' MD, 3,568' TVD89º Inc. Resman Oil/Water Tracer Sub #2 Resman Oil/Water Tracer Sub #3Item MD(ft)ResmantracerSub#1ͲROS683/RWS751 12371ResmantracerSub#2ͲROS682/RWS75012419ResmantracerSub#3ͲROS681/RWS749 11304Item MD(ft)5Ͳ1/2"SwellPkr#1 210875Ͳ1/2"SwellPkr#2 202265Ͳ1/2"SwellPkr#3 186695Ͳ1/2"SwellPkr#4 175325Ͳ1/2"SwellPkr#5 168615Ͳ1/2"SwellPkr#6 152305Ͳ1/2"SwellPkr#7 14039ItemL1 MD(ft)5Ͳ1/2"SwellPkr#1 192835Ͳ1/2"SwellPkr#2 179805Ͳ1/2"SwellPkr#3 167145Ͳ1/2"SwellPkr#4 155835Ͳ1/2"SwellPkr#5 139925Ͳ1/2"SwellPkr#6 123635Ͳ1/2"SwellPkr#7 11493TD 20870' MD/3546' TVDTD 21813' MD/3396' TVDVelocity String: PHL Packer 10' pup of 4-½” tubing, XN nipple XO to 3-1/2” 9.3# L-80 IBT-M tubingTop: 9,476' MD / 3,209' TVDBottom: 11,256' MD/ 3,430' TVD9,456' MD, 3,207' TVD, 83° Inc, - Bottom Motor cenetralizerCentrilift conventional ESP, 66 Stages Flex 47 GS3 Seals, 562XP motor9394' MD / 3199' TVD Discharge Gauge
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/12/2023
Report #: 1
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
22.4
Wind
W @ 8 mph
Days LTI (days)
1,224.00
Days RI (days) POB
68.0
Safety Incidents - Near Miss
Date
5/12/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Working at Heights. Safety alert of the day: IADC 13-09 High
pressure release results in injury. Safety drill of the day: Stripping.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Evacuation Drill 1 5/12/2023 6/9/2023 28
Rig Inspection 1 5/12/2023 5/13/2023 1
Safety Meeting 1 5/12/2023 5/13/2023 1
Spill Drill 1 5/12/2023 5/26/2023 14
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Complete Nipple up BOPE and test. Rig-up Baker Centrilift and GBR for decompletion and pull ESP as per program.
24h Summary
Completed rig-up check list. Transfer 8.6 ppg 3% KCL/NaCl to rig from mud plant. Bull head down the tubing and A annulus, monitored. Install BPV and nipple down tree and nipple up BOPE.
Operation at 07.00
Testing BOPE.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:00 4.00 4.00 W.O. A 2 P Continue berming around rig, perform walking/working surface inspection around rig, covering gaps in rig mating boards,
installing landings on egress from rig. Check suitcase line connection, perform pressure test with air and test level alarm
system, good tests. Move accumulator trailer and reinstall berming for unit, make-up accumulator hydraulic lines in rig sub.
Back on High line power at 08:00 hours.
04:00 08:00 4.00 8.00 W.O. M 1 P Transfer 910 bbls. of 8.6 ppg 3% KCL/NaCl brine treated with biocide from mud plant to rig active pits. Rig-up lines and
valves on tubing and A annulus for well kill, spot bleed trailer and 2” hose to trailer. Assist installing scaffolding over suitcase
for access into well bays. Initial pressure on tubing 64 psi. / A annulus 45 psi. / B annulus 190 psi.
08:00 12:30 4.50 12.50 W.O. M 9 P Fluid pack lines and pressure test lines to 3500 psi. Bull head down tubing with 8.6 ppg 3% KCL/NaCl brine treated with
biocide, ICP 3 bpm at 126 psi stag-up to ICP of 5 bpm at 290 psi. monitored B annulus at 210 psi. Pumped 185 bbls. with
FCP 5 bpm at 255 psi. Monitored A annulus with 104 psi. / B annulus 210 psi. Switched to bull head down A annulus with 968
bbls. of 8.6 ppg 3% KCL/NaCl brine treated with biocide pumping ICP 6 bpm at 300 psi. and FCP 6 bpm at 330 psi.
Monitored tubing 122 psi and B annulus 195 psi. Held ½ hour safety stand down at 11:00 hours with new drilling crew on the
walking/working surfaces.
12:30 17:00 4.50 17.00 W.O. M 1 P Perform flow check for 1 hour tubing 69 psi. A annulus 68 psi. bleed off tubing / A annulus to zero psi.
17:00 19:30 2.50 19.50 W.O. C 5 P Rig down lines, valves and equipment from bull head operation. Vault rep install BPV and nipple down tree, prep tubing
hanger and installing blanking plug. Set high pressure riser on well head and torque to spec.
19:30 00:00 4.50 24.00 W.O. C 5 P Nipple-up BOP stack, set stack on high pressure riser and install two sets of Choke/Kill HCR/manual valves and hose on
stack. Service choke manifold. SIMOPS: load 5” TT525 drill pipe in pipe shed and strap.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1173 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1173 bbls.
Gas Readings
Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%)
Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%)
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 882.0
Hole 897.0
Loss 1,173.0
Cumulative Mud Volumes
Active Volume (bbl)
1,779.0
Hole Volume (bbl)
897.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
1,173.0
Cum Losses (bbl)
1,173.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/12/2023
Report #: 1
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Little Red Services Hot Oil Truck 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 4
Baker Hughes ESP Crew 12.00 5
Schlumberger MI Swaco WIF 12.00 5
EXPRO Flow back 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/12/2023
Consumed
1,140.0
Received
1,140.0
Returned Cum Consumed
1,140.0
Cum Received
1,140.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/12/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
198.0
Cum Received
198.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/12/2023
Consumed
1,001.0
Received
9,552.0
Returned Cum Consumed
1,001.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
8,551.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/12/2023
Consumed
22.0
Received
135.0
Returned Cum Consumed
22.0
Cum Received
135.0
Cum Returned
0.0
Cum On Loc
113.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/12/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
42.0
Cum Received
42.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/12/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
840.0
Cum Received
840.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date Tot insp. Nbr Total I.N.C. number Comment
STOP Cards Submitted
Company # Rpts Com
ASRC 3 Observation
ASRC 1 Communication
Baker-Hughes 1 Environment
Baker-Hughes 1 Observation
Baker-Hughes 1 Procedures
Baker-Hughes 1 Communication
Baker-Hughes 1 Good Catch
Doyon 5 Communication
Doyon 5Mentoring
Doyon 7 Hazard Hunt
Doyon 7 Observation
Doyon 5 Procedures
EXPRO 1Stop Work
EXPRO 2 Procedures
EXPRO 1 Hazard Hunt
Logistics 1 Procedures
Mi-Swaco 1 Procedures
Mi-Swaco 2 Communication
Mi-Swaco 4 Observation
Mi-Swaco 3 Hazard Hunt
Mi-Swaco 1Mentoring
Udelhoven 1 Communication
Vault 1 Environment
Worley 3 Good Catch
Worley 1 Environment
Worley 3Stop Work
Worley 2 Procedures
Worley 1 Hazard ID
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/12/2023
Report #: 1
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Worley 3 Communication
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/13/2023
Report #: 2
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
20.7
Wind
E @ 21 MPH
Days LTI (days)
1,225.00
Days RI (days) POB
64.0
Safety Incidents - Near Miss
Date
5/13/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Change Management. Eni Golden Rules with a focus on: Confined Space. Safety alert of the day: IADC 13-
06 Poor communication amongst crew results in injury. Safety drill of the day: Well Kill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Evacuation Drill 1 5/12/2023 6/9/2023 27
Rig Inspection 2 5/13/2023 5/14/2023 1
Safety Meeting 2 5/13/2023 5/14/2023 1
Spill Drill 1 5/12/2023 5/26/2023 13
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Continue pulling out of hole with ESP assembly laying down 4-1/2” tubing.
24h Summary
Complete nipple-up of BOPE and test, witnessed by Brian Bixby with AOGCC. Rig-up Baker Centrilift and GBR for decompletion and pull ESP as per program. Pull tubing hanger free and lay down, pull out hole
from 9,390’ to 8,838’. Change out GBR tongs.
Operation at 07.00
Pulling out of the hole with ESP assembly, laying down 4-1/2" tubing at 6,544' MD.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:00 4.00 4.00 W.O. C 5 P Continue nipple-up BOP stack, Installing upper and lower choke lines, install bell nipple, flow line to pits and drain pan
covers/hoses, hook-up accumulator hydraulic lines to BOP stack.
04:00 07:30 3.50 7.50 W.O. C 5 P Pick-up 4-1/2” test joint make-up to test dart and set per Vault rep. rig-up test equipment. Fluid pack and perform shell test
3500 psi. good test.
07:30 11:30 4.00 11.50 W.O. C 12 P Test BOPE with 4-1/2” and 5” test joints to 250 psi. low/3500 psi. high for 5 minutes each, with test sequence #1-#11. Tested
Annular, upper and lower pipe rams, upper and lower choke and kill lines, HCR and manual valves. Tested all valves on the
choke manifold. Tested blind rams, dart valve, TIW, upper and lower IBOP on TDS. Manually/remote operated choke 2000
psi, opened and observed pressure bleed off, close at 1300 psi. Accumulator drawdown test on 4-1/2” tubular. Starting @
3000 psi. after function 2150 psi. 200 psi. increase in 10 seconds. Full pressure recovery in 51 seconds. Nitrogen back up 10
bottles with 3800 psi. average. Tested alarms on PVT, G/L, TTG/L, F/O, & gas (LEL/H2S). All good tests.
11:30 13:00 1.50 13.00 W.O. C 5 P Pull test dart as per Vault rep and break/lay down test joint. Blow down and rig down test equipment. Pull BPV with Vault rep.
13:00 18:00 5.00 18.00 W.O. M 1 P Rig-down and move bleed trailer, mobilized GBR power pack and tubing tongs to rig and rig-up. Make-up FOSV with
crossover to 4-1/2” Hydril 563 pin. Lower ESP sheaves from derrick, install environmental hose on sheave and thread ropes
through both ESP and capillary sheaves, re-hang both from derrick board.
18:00 20:30 2.50 20.50 W.O. L 5 P Make-up landing joint to tubing hanger and back out lock down pins on well head as per Vault rep. Pull hanger free with 55K
over, stage pick-up weight from 140K to 180K. Pull hanger to rig floor. Baker Centrilift perform conductivity and electrical on
penetrator and after penetrator removed (good test). Pull out of hole to 9,390 and lay down tubing hanger and swivel jt. UP
wt.=125K.
20:30 23:30 3.00 23.50 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 9,390’ to
8,838’ MD. PUW=125K. adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl Brine inhibited with
Biocide. Pumping tubing volume every 3,000’.
23:30 00:00 0.50 24.00 W.O. L 5 U Change out GBR power tongs.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 50 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with Biocide = 1223 bbls.
Gas Readings
Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%)
Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%)
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 829.0
Hole 900.0
Loss 50.0
Cumulative Mud Volumes
Active Volume (bbl)
1,729.0
Hole Volume (bbl)
900.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
50.0
Cum Losses (bbl)
1,223.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/13/2023
Report #: 2
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/13/2023
Consumed
909.0
Received
909.0
Returned Cum Consumed
2,049.0
Cum Received
2,049.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/13/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
396.0
Cum Received
396.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/13/2023
Consumed
900.0
Received
0.0
Returned Cum Consumed
1,901.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
7,651.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/13/2023
Consumed
70.0
Received
0.0
Returned Cum Consumed
92.0
Cum Received
135.0
Cum Returned
0.0
Cum On Loc
43.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/13/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
84.0
Cum Received
84.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/13/2023
Consumed
2,520.0
Received
2,520.0
Returned Cum Consumed
3,360.0
Cum Received
3,360.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date Tot insp. Nbr Total I.N.C. number Comment
STOP Cards Submitted
Company # Rpts Com
ASRC 1 Observation
ASRC 5 Communication
Baker-Hughes 3 Observation
Baker-Hughes 1 Good Catch
Doyon 8 Procedures
Doyon 2Stop Work
Doyon 6 Communication
Doyon 3Mentoring
Doyon 7 Hazard Hunt
Expro 1 Hazard ID
Expro 1 Procedures
GBR 1 Communication
Logistics 1 Good Catch
Mi-Swaco 3 Procedures
Mi-Swaco 2 Communication
Mi-Swaco 3 Observation
Mi-Swaco 2 Hazard Hunt
Mi-Swaco 1Stop Work
Udelhoven 1 Communication
Vault 1Stop Work
Worley 2 Good Catch
Worley 1 Communication
Worley 2 Hazard Hunt
Worley 2 Environment
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/13/2023
Report #: 2
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Worley 5 Procedures
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/14/2023
Report #: 3
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
31.8
Wind
SE @ 20 MPH
Days LTI (days)
1,226.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/14/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Communication. Eni Golden Rules with a focus on: Driving Safety. Safety alert of the day: IADC 12-32
Inattentiveness results in injured employees. Safety drill of the day: Fire Drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Evacuation Drill 1 5/12/2023 6/9/2023 26
Kick Drill 1 5/14/2023 5/28/2023 14
Rig Inspection 3 5/14/2023 5/15/2023 1
Safety Meeting 3 5/14/2023 5/15/2023 1
Spill Drill 2 5/14/2023 5/28/2023 14
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Mobilized and pick up 9-5/8” casing conditioning and clean out assembly per Baker reps. run in hole picking up 5” TT525 drill pipe singles from pipe shed to SLXP liner top.
24h Summary
Mobilized and changed out GBR tongs. Continue pulling out of hole with ESP assembly laying down 4-1/2” tubing. Pumped tubing volumes at 6,270’ and 3,141’. Lay down ESP pump/motor assembly. Rig down
decompletion equipment and GBR tongs from rig floor. Remove both sheaves from derrick. Mobilized and install wear bushing. Clean and clear rig floor.
Operation at 07.00
Running in the hole with polish mill assembly at 511' MD.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 00:30 0.50 0.50 W.O. L 5 U Mobilized and change out GBR power tongs to rig floor hook-up and function test, good test.
00:30 03:30 3.00 3.50 W.O. L 4 P Pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 8,838’ to 7,008’ MD.
Up wt.= 115K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide.
03:30 04:30 1.00 4.50 W.O. L 5 U Observed hydraulic fluid leaking from fitting on hard line on beaver slide for GBR hydraulic supply line to rig floor. Shut down
and change out fitting and re-connect hose and function test (good test).
04:30 05:30 1.00 5.50 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 7,008’ to
6,270’ MD. Up wt.= 110K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with
biocide. Pumping tubing volume every 3,000’.
05:30 06:30 1.00 6.50 W.O. L 9 P Rig-up high pressure hose and pump tubing volume of 95 bbls. of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, rate of
2.5 bpm at 1300 psi.
06:30 11:00 4.50 11.00 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 6,270’ to
3,141’ MD. Up wt.= 95K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with
biocide. Pumping tubing volume every 3,000’.
11:00 12:00 1.00 12.00 W.O. L 9 P Rig-up high pressure hose and pump tubing volume of 48 bbls. of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, rate of
2.5 bpm at 1460 psi.
12:00 17:00 5.00 17.00 W.O. L 4 P Continue to pull out of hole with ESP assembly laying down 4-1/2” (12.6#/L-80 /HYD 563) tubing to pipe shed from 3,141’ to
71’ MD. Up wt.= 60K. Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide.
17:00 20:00 3.00 20.00 W.O. L 5 P Pull out laying down ESP assembly per Baker Centrilift, the discharge head to pump packed off with scale (samples
collected), no pump rotation. Observed water in upper seal/lower clean oil. Tandem seals and motor free rotation. Scale on
top of shroud (sample collected). Adding 10 bbls. per hour plus pipe displacement of 8.6 PPG 3%KCL/NaCl brine inhibited
with biocide.20:00 23:00 3.00 23.00 W.O. L 5 P Spool ESP cable and Capillary line back to spooling unit. Rig down Baker Centrilift equipment from rig floor and GBR power
tong. Continue to clean and clear rig floor of components. Remove environmental hose from ESP cable sheave and remove
both sheaves out of derrick. Add 10 bbl. per hour of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide.
23:00 00:00 1.00 24.00 W.O. C 5 P Mobilized and install wear bushing with Vault rep (9.12” ID). Clean and clear rig floor. Add 10 bbl. per hour of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 377 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 1600 bbls.
24 Hour metal recovered = 00 lbs.
Total metal recovered = 00 lbs.
Gas Readings
Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%)
Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%)
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 628.0
Hole 939.0
Loss 377.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/14/2023
Report #: 3
Page: 2 of 3
Cumulative Mud Volumes
Active Volume (bbl)
1,567.0
Hole Volume (bbl)
939.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
377.0
Cum Losses (bbl)
1,600.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/14/2023
Consumed
1,061.0
Received
1,061.0
Returned Cum Consumed
3,110.0
Cum Received
3,110.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/14/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
594.0
Cum Received
594.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/14/2023
Consumed
652.0
Received
0.0
Returned Cum Consumed
2,553.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
6,999.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/14/2023
Consumed
26.0
Received
0.0
Returned Cum Consumed
118.0
Cum Received
135.0
Cum Returned
0.0
Cum On Loc
17.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/14/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
126.0
Cum Received
126.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/14/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
4,200.0
Cum Received
4,200.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date Tot insp. Nbr Total I.N.C. number Comment
STOP Cards Submitted
Company # Rpts Com
ACS 1 Good Catch
ACS 1Mentoring
ASRC 1 Observation
ASRC 1Mentoring
ASRC 1 Procedures
ASRC 1 Hazard Hunt
ASRC 2Stop Work
Baker-Hughes 1Stop Work
Baker-Hughes 1 Communication
Doyon 4 Observation
Doyon 4 Hazard Hunt
Doyon 4Mentoring
Doyon 5Stop Work
Doyon 3 Procedures
Doyon 5 Communication
Doyon 1 Good Catch
GBR 2 Communication
GBR 2 Good Catch
Logistics 1 Hazard Hunt
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/14/2023
Report #: 3
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Mi-Swaco 6 Observation
Mi-Swaco 2 Procedures
Mi-Swaco 1 Good Catch
Mi-Swaco 3 Communication
Udelhoven 1 Good Catch
Vault 1 Good Catch
Worley 1Stop Work
Worley 2 Communication
Worley 1 Environment
Worley 1 Observation
Worley 3 Procedures
Worley 1 Unsafe Conditions
Worley 1 Hazard Hunt
Worley 1 Good Catch
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/15/2023
Report #: 4
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
37.4
Wind
SW @ 9 MPH
Days LTI (days)
1,227.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/15/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Control of Work. Eni Golden Rules with a focus on: Energized Systems. Safety alert of the day: IADC 12-26
Gloved hand caught in pipe spinner results in injury. Safety drill of the day: H2S Drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/20/2023 5
BOP Test (pressure)1 5/13/2023 5/20/2023 5
Evacuation Drill 1 5/12/2023 6/9/2023 25
Fire Drill 1 5/15/2023 5/29/2023 14
Kick Drill 1 5/14/2023 5/28/2023 13
Man Down Drill 1 5/15/2023 8/13/2023 90
Rig Inspection 4 5/15/2023 5/16/2023 1
Safety Meeting 4 5/15/2023 5/16/2023 1
Spill Drill 2 5/14/2023 5/28/2023 13
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Pull out hole and lay down BHA #1 and pick-up BHA #2 the 5-1/2” Liner Cleanout Assembly to clean out 5-1/2” liner.
24h Summary
Mobilized and pick up 9-5/8” casing conditioning and clean out assembly. and single in hole with 5” TT525 drill pipe to 11,231’, pump drill pipe volume every 3,000’. Perform casing conditioning and clean out as per
program. Pull out of hole to 11,169. Cut and slip drilling line.
Operation at 07.00
Pulling out of the hole with BHA #1 at 2,952 MD
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 00:30 0.50 0.50 W.O. M 25 P PJSM – Service top drive, blocks and draw-works.
00:30 04:00 3.50 4.00 W.O. M 5 P Mobilized Baker 9-5/8” casing conditioning and clean out assembly to rig floor, beaver slide operation. Pick-up BHA #1
assembly. Adding 10 bbls. per hour of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide.
04:00 12:00 8.00 12.00 W.O. M 4 P Run in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe from 167’ to
4,422’ (3.75” OD pipe drift). Pump volume at 3,041’ pump rate 5 bpm at 500 psi. Continue adding 10 bbls. per hour of 8.6
PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 116K / Dn wt.= 80K.
12:00 18:00 6.00 18.00 W.O. M 4 P Continue running in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe
from 4,422’ to 9,027’ (3.75” OD pipe drift). Pumping volume until pressure at 6,008 pump rate 5 bpm at 511 psi Continue
adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 155K / Dn wt.= 95K.
18:00 20:30 2.50 20.50 W.O. M 4 P Continue running in hole with BHA #1 Baker 9-5/8” casing conditioning and cleanout. Single in hole with 5” TT525 drill pipe
from 9,027’ to 11,142’ (3.75” OD pipe drift). Pumping volume until pressure at 9,060’ pump rate 5 bpm at 300 psi. Continue
adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Up wt.= 175K / Dn wt.= 85K.
20:30 21:30 1.00 21.50 W.O. M 19 P Single in hole from 11,142’, at 30 fpm to 11,231’ and tag with 10K, no issues entering top of liner at 11,219’. Pick-up neutral
weight plus 1’ mark pipe and reciprocate drill pipe from 11,213’ to 11,163’ five time, 9-5/8” casing scraper section was from
11,133’ to 11,083’, pumping 3 BPM at 400 psi. Baker run back to 11,213’ rotate to 11,231’ polishing liner top with 20 rpm @
16K torque, tag with 10K for 2 minutes, reduce pump rate to 3 BPM at 350 psi. Pump out of hole to 11,169’. Up wt.= 175K /
Dn wt.= 85K.
21:30 00:00 2.50 24.00 W.O. M 25 P Cut and slip drill line (110’). Repair grease zerk fitting on line of Brake linkage. Add 10 bbl. per hour of 8.6 PPG 3%KCL/NaCl
brine inhibited with biocide.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 411 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2011 bbls.
24 Hour metal recovered = 00 lbs.
Total metal recovered = 00 lbs.
Gas Readings
Avg Background Gas (%) Max Background Gas (%) Avg Connection Gas (%) Max Connection Gas (%)
Avg Drill Gas (%) Max Drill Gas (%) Avg Trip Gas (%) Max Trip Gas (%)
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 865.0
Hole 866.0
Loss 411.0
Cumulative Mud Volumes
Active Volume (bbl)
1,731.0
Hole Volume (bbl)
866.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
411.0
Cum Losses (bbl)
2,011.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/15/2023
Report #: 4
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative David Smith ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Ted Kruger Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Mark Hubler ASRC Energy Services HSE mark.hubler@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/15/2023
Consumed
859.0
Received
859.0
Returned Cum Consumed
3,969.0
Cum Received
3,969.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/15/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
792.0
Cum Received
792.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/15/2023
Consumed
648.0
Received
0.0
Returned Cum Consumed
3,201.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
6,351.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/15/2023
Consumed
135.0
Received
135.0
Returned Cum Consumed
253.0
Cum Received
270.0
Cum Returned
0.0
Cum On Loc
17.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/15/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
168.0
Cum Received
168.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/15/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
5,040.0
Cum Received
5,040.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1Mentoring
ACS 1 Observation
ASRC 1 Hazard Hunt
ASRC 1 Observation
ASRC 1 Environment
Baker-Hughes 1Mentoring
Baker-Hughes 2 Procedures
Baker-Hughes 2 Observation
Baker-Hughes 1 Good Catch
Doyon 5 Hazard Hunt
Doyon 2 Good Catch
Doyon 13 Communication
Doyon 5 Procedures
Doyon 4 Observation
GBR 1 Observation
Logistics 1Mentoring
Mi-Swaco 5 Communication
Mi-Swaco 2 Procedures
Mi-Swaco 2 Observation
Mi-Swaco 1 Hazard Hunt
Mi-Swaco 2 Good Catch
Udelhoven 1 Procedures
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/15/2023
Report #: 4
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Vault 1 Hazard ID
Worley 1 Procedures
Worley 1Mentoring
Worley 4 Environment
Worley 4 Communication
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/16/2023
Report #: 5
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
21.7
Wind
N @ 10 MPH
Days LTI (days)
1,228.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/16/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Fire safety. Safety alert of the day: IADC 12-22, falling steel
plate results in struck by incident. Safety drill of the day: Kick while drilling.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/20/2023 4
BOP Test (pressure)1 5/13/2023 5/20/2023 4
Evacuation Drill 1 5/12/2023 6/9/2023 24
Fire Drill 1 5/15/2023 5/29/2023 13
H2S Drill 1 5/16/2023 5/30/2023 14
Kick Drill 2 5/16/2023 5/30/2023 14
Man Down Drill 1 5/15/2023 8/13/2023 89
Rig Inspection 5 5/16/2023 5/17/2023 1
Safety Meeting 5 5/16/2023 5/17/2023 1
Spill Drill 2 5/14/2023 5/28/2023 12
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Wash down with polish mill assembly and set weight on brass tattle tale. Pull up to neutral weighty and one foot and mark. Circulate and reciprocating for 1 hour. Pull out of hole and lay down BHA.
24h Summary
Complete cut and slip of drill line. Pull out hole from 11,169’ and lay down BHA #1. Pick-up BHA #2 the 5-1/2” Liner Cleanout Assembly to clean out 5-1/2” liner. Run in hole to 10,810’. Rotate and circulate from
10,810 to 11,206’ MD. Work through restriction between 11,206’ and 11,198’ and pull out of hole to 10,784’ MD. Wash from 10,784 to 11,153’ MD.
Operation at 07.00
Pulling out of the hole with Baker clean out assembly at 1,569' MD.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 01:00 1.00 1.00 W.O. M 25 P Complete cut and slip and calibrate block height. Perform drop inspection Service top drive, blocks and draw-works. Continue
adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
01:00 08:00 7.00 8.00 W.O. M 4 P Pull out of hole from 11,169’ to 167’ MD. Adding 10 bbls of 8.6 ppg brine plus displacement every hour.
08:00 09:30 1.50 9.50 W.O. M 5 P Lay down polish mill with Vacs cleanout run BHA #1 from 167’ to surface. Lay down pup joint, jars, bumper sub, pup joint, 2-
magnets, scraper, pup joint, Vacs tool, and polish mill. Clean magnets and drain Vacs tool, 88 pounds of metal from magnets,
½ bbl emulsified oil sand from Vacs tool. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with
biocide.
09:30 11:00 1.50 11.00 W.O. M 5 P Make up cleanout run #2 in hole to 179’. Make up Polish reamer, pup joint, Vacs tool, pup joint, scraper, 3-magnets, pup joint,
bumper sub, jars, pup joint and X-O. Continue adding 10 bbls. Per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
11:00 18:00 7.00 18.00 W.O. M 4 P Run in hole with BHA #2 on 5” TT525 drill pipe from 179’ to 10,810’ MD, loss of slack off weight. Continue adding 10 bbls. Per
hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
18:00 21:30 3.50 21.50 W.O. M 6 P Rotate and ream at 20 rpm and pump at 1 BPM in hole from 10810’ to 11,202’. Work from 11,202 to 11206’ MD. Travel
restricted between 11,206’ and 11,198’ MD. Reciprocate and work through restriction. Continue adding 10 bbls. per hour of
8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Returns to surface at 141 BBls pumped, oil interface.
21:30 23:00 1.50 23.00 W.O. M 6 P Back ream from 11,206’ to 11,061’ MD, at 1 BPM, 10 psi, 20 rpm, TQ=15 k. Pull on elevators from 11,061 to 10,784’, PU=208
k, RTW=128 k.
23:00 00:00 1.00 24.00 W.O. M 6 P Wash and ream down from 10,784’ to 11,153’ MD, 1 BPM, 20 psi, 20 rpm, Ream down each stand and up with each stand,
then stop rotary and rotation and slack off in hole. RW=129 k, PU=195 k, SO=78 k. Continue adding 10 bbls. per hour of 8.6
PPG 3% KCL/NaCl brine inhibited with biocide.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 338 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2349 bbls.
24 Hour metal recovered = 88 lbs.
Total metal recovered = 88 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 819.0
Hole 866.0
Loss 338.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/16/2023
Report #: 5
Page: 2 of 3
Cumulative Mud Volumes
Active Volume (bbl)
1,685.0
Hole Volume (bbl)
866.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
338.0
Cum Losses (bbl)
2,349.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/16/2023
Consumed
1,091.0
Received
1,091.0
Returned Cum Consumed
5,060.0
Cum Received
5,060.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/16/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
990.0
Cum Received
990.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/16/2023
Consumed
888.0
Received
0.0
Returned Cum Consumed
4,089.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
5,463.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/16/2023
Consumed
83.0
Received
135.0
Returned Cum Consumed
336.0
Cum Received
405.0
Cum Returned
0.0
Cum On Loc
69.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/16/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
210.0
Cum Received
210.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/16/2023
Consumed
420.0
Received
420.0
Returned Cum Consumed
5,460.0
Cum Received
5,460.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Procedures
ACS 1Mentoring
ASRC 3 Communication
ASRC 1Mentoring
ASRC 1 Lesson Learned
ASRC 1Stop Work
ASRC 4 Observation
Baker-Hughes 1 Environment
Baker-Hughes 1Mentoring
Baker-Hughes 1 Procedures
Baker-Hughes 2 Observation
Doyon 3 Hazard Hunt
Doyon 11 Communication
Doyon 5 Procedures
Doyon 1 Good Catch
Doyon 2 Observation
Doyon 2Mentoring
GBR 1 Good Catch
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/16/2023
Report #: 5
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
GBR 1 Observation
Logistics 1 Procedures
Mi-Swaco 1 Environment
Mi-Swaco 2 Good Catch
Mi-Swaco 1Mentoring
Mi-Swaco 1 Hazard Hunt
Mi-Swaco 2 Communication
Mi-Swaco 4 Observation
Mi-Swaco 1 Procedures
Other 1 Observation
Udelhoven 1 Observation
Vault 1 Good Catch
Worley 1 Observation
Worley 1Other
Worley 1 Hazard Hunt
Worley 1 Hazard ID
Worley 1Mentoring
Worley 1 Procedures
Worley 1 Environment
Worley 4 Communication
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/17/2023
Report #: 6
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
21.8
Wind
NW @ 14 MPH
Days LTI (days)
1,229.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/17/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Complacency. Eni Golden Rules with a focus on: Health management. Safety alert of the day: IADC 12-18,
loose machine guarding results in injury. Safety drill of the day: Man down.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/20/2023 3
BOP Test (pressure)1 5/13/2023 5/20/2023 3
Evacuation Drill 2 5/17/2023 6/14/2023 28
Fire Drill 1 5/15/2023 5/29/2023 12
H2S Drill 1 5/16/2023 5/30/2023 13
Kick Drill 3 5/17/2023 5/31/2023 14
Man Down Drill 1 5/15/2023 8/13/2023 88
Rig Inspection 6 5/17/2023 5/18/2023 1
Safety Meeting 6 5/17/2023 5/18/2023 1
Spill Drill 2 5/14/2023 5/28/2023 11
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Continue to run in hole with cleanout run #3 and set down on liner top and tag top of liner with indicator. Pumping to clean up liner top. Pull out of hole and lay down BHA. Clean Vacs tool and access need for
additional run. Make up and run in hole with BHA #4 with 2 7/8” tailpipe. Pull out of hole and lay down assembly.
24h Summary
Wash down with clean out assembly from 11,153’ to 11,204’ MD. Pull out of hole with clean out run #2 from 11,204’ to surface. Clean out sand from Vacs tool and clean magnets. Make up clean out run #3 and run
in hole to 11,146’ MD.
Operation at 07.00
Laying down BHA # 3, Baker clean out assembly.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 01:30 1.50 1.50 W.O. M 4 P Wash down with clean out assembly from 11,153’ to 11,204’ MD, RPM=20, TQ=18 k, 1-5 BPM, 20-650 psi. Unable to ream
past 11,204’. Continue adding 10 bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Continue to inspect
and process 3.5” tubing in pipe shed.
01:30 02:00 0.50 2.00 W.O. M 4 P Pull out of the hole while rotating from 11,204’ to 11,084’ MD at 1 BPM, 20 psi, 20 rpm.
02:00 07:00 5.00 7.00 W.O. M 4 P Pull out of hole on elevators from 11,084’ to 179’ MD. Continue adding 10 bbls per hour plus displacement of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide.
07:00 12:00 5.00 12.00 W.O. M 5 P Lay down BHA cleanout run #2 from 179’ to surface. Clean magnets, remove sand from Vacs tool, clean rig floor, prep no-go
sub for next run. Recover 68 LBS of fine metal from magnets. Vacs tool full of dry course sand.
12:00 12:30 0.50 12.50 W.O. M 25 P Complete MP2 work order on top drive lube pump, Drops inspection on top drive. Grease draw works, grease iron roughneck,
change dies in iron roughneck.
12:30 16:00 3.50 16.00 W.O. M 1 P Clean and clear floor. Finish processing 3.5” tubing. Clean out slop tank. Change out gear oil filter on top drive.
16:00 18:00 2.00 18.00 W.O. M 5 P Mobilize mill to rig floor. Make up Vacs tool clean out run #3 and run in hole to 140’ MD. Remove 2 magnets, scraper, 9’ pup
and polish mill from rig floor.
18:00 00:00 6.00 24.00 W.O. M 4 P Run in hole with cleanout run #3 on TT525 drill pipe from 140’ to 11,146’’ MD, PU=158 K, SO=103 K. Continue adding 10
bbls. per hour of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide. Filling pipe every 3000’. No returns.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 346 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 2695 bbls.
24 Hour metal recovered = 68 lbs.
Total metal recovered = 156 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 910.0
Hole 866.0
Loss 346.0
Cumulative Mud Volumes
Active Volume (bbl)
1,776.0
Hole Volume (bbl)
866.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
346.0
Cum Losses (bbl)
2,695.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/17/2023
Report #: 6
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/17/2023
Consumed
951.0
Received
951.0
Returned Cum Consumed
6,011.0
Cum Received
6,011.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/17/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
1,188.0
Cum Received
1,188.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/17/2023
Consumed
900.0
Received
0.0
Returned Cum Consumed
4,989.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
4,563.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/17/2023
Consumed
52.0
Received
0.0
Returned Cum Consumed
388.0
Cum Received
405.0
Cum Returned
0.0
Cum On Loc
17.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/17/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
252.0
Cum Received
252.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/17/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
6,300.0
Cum Received
6,300.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1Mentoring
ACS 1Stop Work
ASRC 2 Procedures
ASRC 3 Observation
ASRC 2Stop Work
Baker-Hughes 1 Communication
Baker-Hughes 2 Procedures
Baker-Hughes 2 Good Catch
Baker-Hughes 2Stop Work
Doyon 5 Communication
Doyon 2Mentoring
Doyon 10 Procedures
Doyon 5 Observation
Doyon 3 Hazard Hunt
GBR 1 Good Catch
GBR 1 Procedures
Logistics 1Mentoring
Mi-Swaco 3 Observation
Mi-Swaco 3 Good Catch
Mi-Swaco 1 Communication
Mi-Swaco 4 Procedures
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/17/2023
Report #: 6
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Mi-Swaco 1 Unsafe Conditions
Superior 1 Observation
Vault 1 Observation
Worley 2 Communication
Worley 5 Procedures
Worley 1 Hazard Hunt
Worley 2 Observation
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/18/2023
Report #: 7
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
26.1
Wind
S @ 6 MPH
Days LTI (days)
1,230.00
Days RI (days) POB
67.0
Safety Incidents - Near Miss
Date
5/18/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Commitment. Eni Golden Rules with a focus on: Lifting operations. Safety alert of the day: IADC 12-15,
improper body placement results in injury to mouth. Safety drill of the day: Rig evacuation.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/20/2023 2
BOP Test (pressure)1 5/13/2023 5/20/2023 2
Evacuation Drill 2 5/17/2023 6/14/2023 27
Fire Drill 2 5/18/2023 6/1/2023 14
H2S Drill 1 5/16/2023 5/30/2023 12
Kick Drill 3 5/17/2023 5/31/2023 13
Man Down Drill 1 5/15/2023 8/13/2023 87
Rig Inspection 7 5/18/2023 5/19/2023 1
Safety Meeting 7 5/18/2023 5/19/2023 1
Spill Drill 2 5/14/2023 5/28/2023 10
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Pull out of hole and lay down Vacs tool BHA #4 cleanout assembly. Empty Vacs tool and clean magnet. Make up and run in hole with cleanout BHA #5 with 800’ of 2-7/8” tail pipe. Pull out of hole and lay down
BHA. Run in hole with test packer.
24h Summary
Run in hole with cleanout BHA #3. Set down on liner top and tag top of liner with indicator at 11,219’. Pull out of hole from 11,219’ and lay down BHA. Recover 1-¼ bbl from Vacs tool and 34 pounds of metal from
magnet. Run in hole with Vacs tool cleanout BHA #4 and 2-7/8” Tailpipe to 11,625’. Pull out of from 11,625’ to 3994’ MD.
Operation at 07.00
Finish laying Down BHA #4. Clean and prep floor for next run.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 01:00 1.00 1.00 W.O. M 4 P Wash and ream in hole with cleanout BHA #3 on TT525 drill pipe from 11,146’ to 11,225’ MD, Tagging Liner top at 11,219’ with
brass indicator and rotating 1 minute with 10k weight, PU=158 K, SO=103 K, 20 rpm, 3-5 BPM, 162 psi. Pull up to neutral
weight plus 1’. Reciprocate from 11,224’ to 11,200 for 30 minutes. No extra torque or taking weight until indicator on liner top.
01:00 05:30 4.50 5.50 W.O. M 4 P Pull out of hole standing back stands in derrick from 11,224’ to 142’. Continue adding 10 bbls per hour of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide. Filling pipe every 3000’.
05:30 07:30 2.00 7.50 W.O. M 5 P PJSM and lay down BHA, Clean Vacs tool, lay down pup joint, bumper sub, jars, pup joint, clean magnet. Recovered 34 LBS
of metal fines. Change out iron rough neck die blocks for smaller OD pipe, break and lay down mill, Change iron roughneck
die back. Recover ¾ BBL sand and ¼ BBL of emulsified oily sands.
07:30 09:00 1.50 9.00 W.O. M 1 P Clean rig floor. De-mobilize BHA tools from rig floor, mobilize GBR power tongs, elevators and slips for 2-7/8” PH6, cross over
for FOSV.
09:00 12:30 3.50 12.50 W.O. M 5 P Pick up and make up BHA #4. Run in hole from surface to 556’ MD of 2-7/8” PH6, SO=62 k. Torque each connection with
GBR power tongs.
12:30 18:00 5.50 18.00 W.O. M 4 P Run in hole with Cleanout BHA #4 from 556’ to 11,177’, PU=158 K, SO=106 k.
18:00 21:00 3.00 21.00 W.O. M 4 P Wash and ream from 11,177’ to 11,625’ MD at 5 BPM, 600 psi, 10 rpm, TQ=8 k, 4-15 ft/min. No returns to surface. Pump out
of hole from 11,625’ to 11,173’ MD, 5 BPM, 575 psi, 20-25 rpm. No returns to surface.
21:00 00:00 3.00 24.00 W.O. M 4 P Pull out of hole on elevators from 11,173’ to 3994’ MD. Adding 10 bbls per hour plus displacement of 8.6 PPG 3% KCL/NaCl
brine inhibited with biocide.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 1027 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 3722 bbls.
24 Hour metal recovered = 34 lbs.
Total metal recovered = 190 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 821.0
Hole 913.0
Loss 1,027.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/18/2023
Report #: 7
Page: 2 of 3
Cumulative Mud Volumes
Active Volume (bbl)
1,734.0
Hole Volume (bbl)
913.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
1,027.0
Cum Losses (bbl)
3,722.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Baker Hughes ESP Crew 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/18/2023
Consumed
1,056.0
Received
1,056.0
Returned Cum Consumed
7,067.0
Cum Received
7,067.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/18/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
1,386.0
Cum Received
1,386.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/18/2023
Consumed
816.0
Received
0.0
Returned Cum Consumed
5,805.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
3,747.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/18/2023
Consumed
74.0
Received
135.0
Returned Cum Consumed
462.0
Cum Received
540.0
Cum Returned
0.0
Cum On Loc
78.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/18/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
294.0
Cum Received
294.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/18/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
7,140.0
Cum Received
7,140.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Communication
ASRC 1 Hazard Hunt
ASRC 2 Procedures
ASRC 1 Environment
ASRC 4 Observation
Baker-Hughes 3 Observation
Baker-Hughes 1 Environment
Baker-Hughes 1 Good Catch
Baker-Hughes 1 Communication
Baker-Hughes 1 Procedures
Doyon 8 Communication
Doyon 1 Hazard Hunt
Doyon 1 Good Catch
Doyon 2Stop Work
Doyon 4 Observation
Doyon 1Mentoring
Doyon 1 At Risk Behavior
Doyon 6 Procedures
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/18/2023
Report #: 7
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
GBR 1 Good Catch
GBR 1 Communication
Mi-Swaco 1 Procedures
Mi-Swaco 1 Good Catch
Mi-Swaco 10 Observation
Mi-Swaco 1 Communication
Superior 1 Procedures
Udelhoven 1 Observation
Vault 1 Procedures
Worley 1Near Miss
Worley 3 Communication
Worley 1 Environment
Worley 1Stop Work
Worley 1 Hazard ID
Worley 3 Procedures
Worley 2 Hazard Hunt
Worley 2 Observation
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/19/2023
Report #: 8
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
24.1
Wind
S @ 12 MPH
Days LTI (days)
1,231.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/19/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Management of change. Safety alert of the day: IADC 12-09,
Tangled fall arrest cable results in fatality. Safety drill of the day: Facility evacuation.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/20/2023 1
BOP Test (pressure)1 5/13/2023 5/20/2023 1
Evacuation Drill 3 5/19/2023 6/16/2023 28
Fire Drill 2 5/18/2023 6/1/2023 13
H2S Drill 1 5/16/2023 5/30/2023 11
Kick Drill 3 5/17/2023 5/31/2023 12
Man Down Drill 1 5/15/2023 8/13/2023 86
Rig Inspection 8 5/19/2023 5/20/2023 1
Safety Meeting 8 5/19/2023 5/20/2023 1
Spill Drill 2 5/14/2023 5/28/2023 9
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Pull out of hole and lay down BHA #5. Clean Vacs tool and pipe to assess need for additional clean out run. Test BOPE with 3.5” and 5” test joints. Run in hole with packer and test casing.
24h Summary
Pull out of hole with Vacs tool cleanout run #4 with 400’ of 2-7/8” tail pipe from 3994’ and lay down.. Empty Vacs tool and clean magnet. Make up and run in hole with cleanout BHA #5 with 800’ of 2-7/8” tail pipe to
12,028’. Pump out of hole at 5 BPM from 12,028’ to 11,211’ MD. Pull out of hole on elevators from 11,211’ to 9630’ MD.
Operation at 07.00
Finish laying Down BHA #5. Clean and prep floor for BOPE test.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 01:30 1.50 1.50 W.O. M 4 P Pull out of hole on elevators with Clean out BHA #4, Vacs tool and 400’ of 2-7/8” tail pipe from 3994’ to 546’ MD. Adding 10
bbls per hour plus displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
01:30 03:00 1.50 3.00 W.O. M 5 P Lay down BHA, pup joint, bumper sub, jars, pup joint, Magnet, pup joint, Vacs tool, pup joint, NO-GO and cross over. Drain
and clean Vacs tool and recover 1/3 BBL of emulsified oil and sand, Recover 21 pounds of metal from magnet.
03:00 07:00 4.00 7.00 W.O. M 5 P Swap elevators, Mobilize GBR power tongs to rig floor and rig up tongs. Lay down 2-7/8” pipe from 405’ to surface, recover
1.6 bbls of fine sand and emulsified crude from inside pipe above the finger valve.
07:00 09:00 2.00 9.00 W.O. M 1 P Clean rig floor after Vacs tool run.
09:00 12:00 3.00 12.00 W.O. M 5 P Make up 2-7/8” PH6 pipe torque to 4K from surface to 805’. Adding 10 BPH of 8.6 PPG 3%KCL/NaCl brine inhibited with
biocide.
12:00 12:30 0.50 12.50 W.O. M 20 U Loss of highline power at 12:00. Bring rig generator online and power up equipment.
12:30 14:00 1.50 14.00 W.O. M 5 P Continue to make up clean out BHA from 805’ to 955’, SO=77 k.
14:00 19:30 5.50 19.50 W.O. M 4 P Run in hole with BHA #5 from 955’ to 11,215’, PU=150 K, SO=106 k. Adding 10 BPH of brine every hour, fill pipe every 3000’.
Bring highline power on to rig at 16:00.
19:30 23:00 3.50 23.00 W.O. M 4 P Wash down from 11,215’ to 12,028’, 5 BPM, 580 PSI, 15-20 ft/min, reciprocate razor back scraper 3 times from 11,207’ to
11,157’ MD. Pump out of hole at 5 BPM from 12,028’ to 11,211’ utilizing Vacs tool to clean hole, 560 psi, PU=154 k, SO=105
k. 23:00 00:00 1.00 24.00 W.O. M 4 P Pull out of hole on elevators from 11,211’ to 9630’ MD, PU=145 K, SO=105 K.
Note:
Highline power off from 12:00-16:00.
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 909 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 4631 bbls.
24 Hour metal recovered = 21 lbs.
Total metal recovered = 211 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 904.0
Hole 876.0
Loss 909.0
Cumulative Mud Volumes
Active Volume (bbl)
1,780.0
Hole Volume (bbl)
876.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
909.0
Cum Losses (bbl)
4,631.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/19/2023
Report #: 8
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 4
Schlumberger MI Swaco WIF 12.00 5
Baker Hughes ESP Crew 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/19/2023
Consumed
885.0
Received
885.0
Returned Cum Consumed
7,952.0
Cum Received
7,952.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/19/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
1,584.0
Cum Received
1,584.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/19/2023
Consumed
828.0
Received
0.0
Returned Cum Consumed
6,633.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
2,919.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/19/2023
Consumed
78.0
Received
0.0
Returned Cum Consumed
540.0
Cum Received
540.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/19/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
336.0
Cum Received
336.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/19/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
7,980.0
Cum Received
7,980.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Communication
ASRC 7 Observation
ASRC 1 Communication
Baker-Hughes 2 Procedures
Baker-Hughes 3 Observation
Baker-Hughes 2Stop Work
Doyon 2Mentoring
Doyon 8 Communication
Doyon 8 Procedures
Doyon 2 Good Catch
Doyon 3 Hazard Hunt
GBR 1 Communication
GBR 1 Observation
Mi-Swaco 3 Communication
Mi-Swaco 1 Unsafe Conditions
Mi-Swaco 1Mentoring
Mi-Swaco 4 Observation
Mi-Swaco 1 Environment
Mi-Swaco 2 Procedures
Superior 1 Procedures
Udelhoven 1 Observation
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/19/2023
Report #: 8
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Vault 1 Environment
Worley 2 Environment
Worley 2 Communication
Worley 2Mentoring
Worley 1 Good Catch
Worley 4 Procedures
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/20/2023
Report #: 9
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Clear
Temperature (°F)
29.8
Wind
SW @ 15 MPH
Days LTI (days)
1,232.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/20/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Change management. Eni Golden Rules with a focus on: Permit to work. Safety alert of the day: IADC 12-06,
Struck by incident results in sprained ankle. Safety drill of the day: Spill drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 7
BOP Test (pressure)2 5/20/2023 5/27/2023 7
Evacuation Drill 3 5/19/2023 6/16/2023 27
Fire Drill 2 5/18/2023 6/1/2023 12
H2S Drill 1 5/16/2023 5/30/2023 10
Kick Drill 3 5/17/2023 5/31/2023 11
Man Down Drill 1 5/15/2023 8/13/2023 85
Rig Inspection 9 5/20/2023 5/21/2023 1
Safety Meeting 9 5/20/2023 5/21/2023 1
Spill Drill 2 5/14/2023 5/28/2023 8
Well Kill Drill 1 5/20/2023 6/3/2023 14
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Make up right hand turn Baker test packer and run in hole and set. Fill casing with brine and bleed air. Test 9-5/8” casing to 2000 psi, Unseat packer and pull out of hole. Lay down packer. Rig up to run middle
completion.
24h Summary
Pull out of hole on elevators from 9,630’ and lay down BHA #5. Clean Vacs tool and 2-7/8” pipe. Rig down equipment and clean floor. Rig up and test BOPE. Rig down test equipment. Make up test packer and run
in hole to 1,413’ MD.
Operation at 07.00
Preparing to test 9-5/8" casing with Baker test packer.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:00 4.00 4.00 W.O. M 4 P Pull out of hole on elevators from 9630’ to956’ MD, PU=145 K, SO=105 K. Adding 10 BPH and pipe displacement of 8.6 PPG
3%KCL/NaCl brine inhibited with biocide.
04:00 05:30 1.50 5.50 W.O. M 5 P Lay down BHA #5, crossover, pup joint, jars, bumper sub, pup joint, magnet, pup joint, Vacs tool, pup joint, Razor back
scraper, no-go dress mill and 2- crossover. Recover 14 pounds of metal fines from magnet, recover 1/3 barrel of emulsified
crude and trace sand from Vacs tool. Clean and clear floor of BHA components.
05:30 14:30 9.00 14.50 W.O. M 5 P Rig up GBR power tongs to lay down 2-7/8” PH6 tail pipe. Lay down 2-7/8” pipe from 809’ to surface. No sands in pipe,
emulsified oil only. Rig down and de-mobilize GBR power tongs and die box from rig floor. De-mobilize 2-7/8” tools from rig
floor. Clean up floor and equipment emulsified oil and sand from trips. Adding 10 BPH of brine.
14:30 15:30 1.00 15.50 W.O. C 5 P Rig up to test BOPE. Flood system with water and purge air. Perform shell test to 3500 psi, good test.
15:30 20:30 5.00 20.50 W.O. C 12 P Test BOPE 250/3500 psi with 3-1/2” and 5” test joints, witness waived by AOGCC Guy Cook. Test gas alarms, test PVT and
flow alarms. Perform accumulator draw down test. All good tests.
20:30 21:00 0.50 21.00 W.O. C 5 P Pull test plug and install wear ring, ID=9.12”. Rig down test equipment.
21:00 22:30 1.50 22.50 W.O. M 5 P PJSM, Pick up and break off cross overs from cleanout BHA. Lay down components.
22:30 23:00 0.50 23.00 W.O. M 5 P Mobilize and make up Right handed set Baker test packer BHA #6 assembly. Make up and run in hole to 16’.
23:00 00:00 1.00 24.00 W.O. M 4 P Run in hole from 16’ to 1413’ MD, SO=87 k, 70 ft/min, fill pipe every 30 stands.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 254 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 4885 bbls.
24 Hour metal recovered = 14 lbs.
Total metal recovered = 225 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 641.0
Hole 930.0
Loss 4,885.0
Cumulative Mud Volumes
Active Volume (bbl)
1,571.0
Hole Volume (bbl)
930.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
4,885.0
Cum Losses (bbl)
9,516.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/20/2023
Report #: 9
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 4
Schlumberger MI Swaco WIF 12.00 5
Baker Hughes ESP Crew 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/20/2023
Consumed
887.0
Received
887.0
Returned Cum Consumed
8,839.0
Cum Received
8,839.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/20/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
1,782.0
Cum Received
1,782.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/20/2023
Consumed
609.0
Received
0.0
Returned Cum Consumed
7,242.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
2,310.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/20/2023
Consumed
14.0
Received
135.0
Returned Cum Consumed
554.0
Cum Received
675.0
Cum Returned
0.0
Cum On Loc
121.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/20/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
378.0
Cum Received
378.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/20/2023
Consumed Received Returned Cum Consumed
7,980.0
Cum Received
7,980.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ASRC 1 Communication
ASRC 1 Hazard ID
ASRC 1Mentoring
ASRC 3 Observation
ASRC 1 Hazard Hunt
ASRC 1 Good Catch
Baker-Hughes 2 Good Catch
Baker-Hughes 3 Observation
Baker-Hughes 2 Procedures
Baker-Hughes 1 Environment
Doyon 9 Procedures
Doyon 2 Observation
Doyon 2 Hazard Hunt
Doyon 4 Communication
Doyon 3Stop Work
Doyon 2Mentoring
GBR 2 Observation
Mi-Swaco 1 Procedures
Mi-Swaco 7 Observation
Mi-Swaco 1 Environment
Mi-Swaco 3 Good Catch
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/20/2023
Report #: 9
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Superior 1 Good Catch
Udelhoven 1 At Risk Behavior
Vault 1 Communication
Worley 1Near Miss
Worley 1 Environment
Worley 5 Procedures
Worley 1 Good Catch
Worley 2 Observation
Worley 2 Communication
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/21/2023
Report #: 10
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
30.9
Wind
S @ 5 MPH
Days LTI (days)
1,233.00
Days RI (days) POB
68.0
Safety Incidents - Near Miss
Date
5/21/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Communications. Eni Golden Rules with a focus on: Waste management. Safety alert of the day: IADC 12-02,
Disregard for energy isolation procedures results in amputation. Safety drill of the day: Stripping drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 6
BOP Test (pressure)2 5/20/2023 5/27/2023 6
Evacuation Drill 3 5/19/2023 6/16/2023 26
Fire Drill 2 5/18/2023 6/1/2023 11
H2S Drill 1 5/16/2023 5/30/2023 9
Kick Drill 3 5/17/2023 5/31/2023 10
Man Down Drill 1 5/15/2023 8/13/2023 84
Rig Inspection 10 5/21/2023 5/22/2023 1
Safety Meeting 10 5/21/2023 5/22/2023 1
Spill Drill 3 5/21/2023 6/4/2023 14
Well Kill Drill 1 5/20/2023 6/3/2023 13
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Pull out of hole and lay down BHA #6 test packer. Rig up to run middle. Run 3-1/2” middle completion. Rig down middle completion running tools. Rig up to run 4-1/2” upper completion.
24h Summary
Run in hole to 11,179’ MD set packer and test casing, test failed. Pull up hole and set packer at 11,103’ MD, test fail. Pull up to 11,039’, test fail. Slip and cut 102’ of drilling line. Pull up hole and set packer at 9610’
MD and test to 2000 psi, good test. Run in hole and set packer at 10,080’ MD, good test. Run in hole to 11,170’, set packer and test, test fail. Rig down test equipment. Pull out of hole from 11,170’ to 9,805’ MD.
Operation at 07.00
Picking up middle completion, and run in the hole.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 06:30 6.50 6.50 W.O. M 4 P Run in hole from 1,413’ to 10,175’ MD, PU=148, SO=106 k, fill pipe every 30 stands. Adding 10 BPH of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
06:30 13:30 7.00 13.50 W.O. M 12 P Attempt to set packer with 35 k down weight at 11,179’, could not set packer. Pulled up hole to 11,102’ worked packer and set
at 11,103’, filled annulus and line up to test backside, test failed. Pull up to 11,061’ and set down 25 k, test backside to 2000
psi staging up 500 psi increments, test failed. Set down 50 k and retest, test failed. Attempt to test at 11,044’ with center of
element at 11,039’ MD. Fill annulus and allow air to migrate. Stage up pressure at .5 BPM to 800 psi, 1000 psi and up to 2000
psi, test failed.
13:30 14:00 0.50 14.00 W.O. M 4 P Run in hole with two singles from pipe shed from 11,049’ to 11,110’ MD, PU=150 k, SO=105 k. Rig down test equipment and
blow down choke and kill lines.
14:00 15:30 1.50 15.50 W.O. M 25 P PJSM, slip and cut 102’ of drilling line, inspect brakes, calibrate block and hook load.
15:30 16:30 1.00 16.50 W.O. M 4 P Pull out of hole from 11,110’ to 9,615’ MD.
16:30 18:00 1.50 18.00 W.O. M 12 P With center of element at 9,610’ MD. Set packer and test casing. Fill annulus and allow air to migrate, Stage up pressure in
500 psi increments at .5 BPM to 2000 psi. Test 9 5/8” casing for 30 minutes charted, good test.
18:00 19:00 1.00 19.00 W.O. M 4 P Release packer. Run in hole from 9,616’ to 10,085’ MD, PU=150 K, SO=105 K.
19:00 20:30 1.50 20.50 W.O. M 12 P Set packer with center element at 10,080’ MD and test casing. Fill annulus and allow air to migrate, Stage up pressure in 500
psi increments at .5 BPM to 2000 psi. Test 9 5/8” casing for 30 minutes charted, good test.
20:30 21:30 1.00 21.50 W.O. M 4 P Release packer. Run in hole from 10,085’ to 11,170’ MD, PU=155, SO=104 k.
21:30 23:00 1.50 23.00 W.O. M 12 P Set packer with center of element at 11,165’MD and test casing. Fill annulus and allow air to migrate, Stage up pressure in
500 psi increments at .5 BPM to 2000 psi. Test 9-5/8” casing for 30 minutes charted, test failed. Bled off throughout each
stage of pressure. Bleed off pressure and release packer.
23:00 23:30 0.50 23.50 W.O. M 5 P Rig down test equipment. Blow down surface equipment.
23:30 00:00 0.50 24.00 W.O. M 4 P Pull out of hole from 11,170’ to 9,805’ MD. PU=146 K, SO=104 k. Adding 10 BPH and pipe displacement of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 373 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 5258 bbls.
24 Hour metal recovered = 0 lbs.
Total metal recovered = 225 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/21/2023
Report #: 10
Page: 2 of 3
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 884.0
Hole 875.0
Loss 373.0
Cumulative Mud Volumes
Active Volume (bbl)
1,759.0
Hole Volume (bbl)
875.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
373.0
Cum Losses (bbl)
5,258.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Halliburton Completion Hands 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 4
Schlumberger MI Swaco WIF 12.00 5
Baker Hughes ESP Crew 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/21/2023
Consumed
918.0
Received
918.0
Returned Cum Consumed
9,757.0
Cum Received
9,757.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/21/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
1,980.0
Cum Received
1,980.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/21/2023
Consumed
579.0
Received
0.0
Returned Cum Consumed
7,821.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
1,731.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/21/2023
Consumed
60.0
Received
0.0
Returned Cum Consumed
614.0
Cum Received
675.0
Cum Returned
0.0
Cum On Loc
61.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/21/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
420.0
Cum Received
420.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/21/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
9,240.0
Cum Received
9,240.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Hazard ID
ASRC 1 Communication
ASRC 1 Good Catch
ASRC 1 Hazard Hunt
ASRC 4 Observation
Baker-Hughes 3 Procedures
Baker-Hughes 1 Observation
Baker-Hughes 1Mentoring
Baker-Hughes 1 Hazard ID
Baker-Hughes 1 Communication
Doyon 2Stop Work
Doyon 10 Procedures
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/21/2023
Report #: 10
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Doyon 4 Communication
Doyon 1 Observation
Doyon 1Mentoring
Doyon 6 Hazard Hunt
Doyon 1 Good Catch
GBR 1 Observation
GBR 1 Procedures
Mi-Swaco 3 Communication
Mi-Swaco 7 Observation
Mi-Swaco 1 Good Catch
Mi-Swaco 1Mentoring
Superior 1 Procedures
Udelhoven 1 Observation
Vault 1 Procedures
Worley 6 Procedures
Worley 2 Communication
Worley 2 Observation
Worley 1 Good Catch
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/22/2023
Report #: 11
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Clear
Temperature (°F)
33.9
Wind
S @ 14 MPH
Days LTI (days)
1,234.00
Days RI (days) POB
69.0
Safety Incidents - Near Miss
Date
5/22/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Control of work. Eni Golden Rules with a focus on: Working at heights. Safety alert of the day: IADC 11-30,
Accidental triggering of power washer results in foot injury. Safety drill of the day: Well kill drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 5
BOP Test (pressure)2 5/20/2023 5/27/2023 5
Evacuation Drill 3 5/19/2023 6/16/2023 25
Fire Drill 2 5/18/2023 6/1/2023 10
H2S Drill 1 5/16/2023 5/30/2023 8
Kick Drill 4 5/22/2023 6/5/2023 14
Man Down Drill 1 5/15/2023 8/13/2023 83
Rig Inspection 11 5/22/2023 5/23/2023 1
Safety Meeting 11 5/22/2023 5/23/2023 1
Spill Drill 3 5/21/2023 6/4/2023 13
Strip Drill 1 5/22/2023 6/19/2023 28
Well Kill Drill 1 5/20/2023 6/3/2023 12
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Continue pulling out of hole laying down drill pipe from 4,786’ MD. Rig up and run 4-1/2” upper completion.
24h Summary
Pull out of hole from 9,805’ MD and lay down packer assembly. Rig up to run middle completion. Run 3-1/2” middle completion and set packer, liner top at 9,476’. Rig down middle completion running tools. Pull out
of hole laying down drill pipe from 9500’ to 4786’ MD.
Operation at 07.00
Pulling out of the hole with setting tools and laying down drill pipe.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:00 4.00 4.00 W.O. M 4 P PJSM, pull out of hole from 9,805’ to 16’ MD. Lay down packer assembly. Adding 10 BPH and pipe displacement of 8.6 PPG
3%KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
04:00 05:30 1.50 5.50 W.O. M 5 P Change out iron rough neck die blocks, break off bull nose from packer and lay down Packer assembly from 16’ to surface.
Mobilize GBR power tongs, slips, and elevators and crossovers. Rig up power tongs.
05:30 11:30 6.00 11.50 W.O. K 4 P PJSM, Pick up and run in hole to 1,789’ MD with 3-1/2” IBTM mule shoe and tubing. Pump 25 bbls of brine at 4 BPM through
tubing to flush. Make up Halliburton Hanger assembly and Baker setting sleeve.
11:30 12:00 0.50 12.00 W.O. K 5 P Rig down GBR power tongs, slips and elevators and move off floor.
12:00 18:00 6.00 18.00 W.O. K 4 P Run in hole with 3-1/2” middle completion on TT525 drill pipe from 1,789’ to 11,256’ MD, PU=145 k, SO=105 K, run in at 90
ft/min. Filling pipe every 3000’.
18:00 19:30 1.50 19.50 W.O. K 9 P Drop 1.5” setting ball, circulate at 3.5 BPM, 35 psi. Slow down pumping to 1.5 BPM at 1000 strokes, 0 psi. Ball on seat at
1511 strokes. Increase pressure and observe packer set at 2200 psi, bring pressure up to 3600 psi and hold for 15 minutes.
Bleed pressure off and set 25 k on packer to confirm set. Pressure back up and shear ball seat at 4900 psi. Pick up 5’ and
verify release. Top of liner set at 9,476’.
19:30 00:00 4.50 24.00 W.O. K 4 P Pull out of hole laying down drill pipe to pipe shed from 9,500’ to 4,786’, PU-115 K, SO104 K. Adding 10 BPH and pipe
displacement of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 525 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 5783 bbls.
24 Hour metal recovered = 0 lbs.
Total metal recovered = 225 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 738.0
Hole 895.0
Loss 525.0
Cumulative Mud Volumes
Active Volume (bbl)
1,633.0
Hole Volume (bbl)
895.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
525.0
Cum Losses (bbl)
5,783.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/22/2023
Report #: 11
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Bob Smejkal ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Viktor Torres Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Harold Richardson Doyon Drilling HSE hrichardson@doyondrilling.com 907-685-0796
Safety Representative Tyler Gochenauer Doyon Drilling HSE tgochenauer@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
ASRC Energy Services Company man 12.00 2
Baker Hughes Tool Hands 12.00 2
GBR Tubing services 12.00 2
Halliburton Completion Hands 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
Vault Wellhead 12.00 2
Schlumberger MI-Swaco Mud plant 12.00 4
Schlumberger MI Swaco WIF 12.00 5
Baker Hughes ESP Crew 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/22/2023
Consumed
904.0
Received
904.0
Returned Cum Consumed
10,661.0
Cum Received
10,661.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/22/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
2,178.0
Cum Received
2,178.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/22/2023
Consumed
543.0
Received
0.0
Returned Cum Consumed
8,364.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
1,188.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/22/2023
Consumed
57.0
Received
135.0
Returned Cum Consumed
671.0
Cum Received
810.0
Cum Returned
0.0
Cum On Loc
139.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/22/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
462.0
Cum Received
462.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/22/2023
Consumed
420.0
Received
420.0
Returned Cum Consumed
9,660.0
Cum Received
9,660.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Environment
ASRC 2 Observation
ASRC 2 Procedures
ASRC 1 Hazard Hunt
ASRC 1Stop Work
ASRC 2 Communication
Baker-Hughes 1 Communication
Baker-Hughes 2 Good Catch
Baker-Hughes 1 Observation
Baker-Hughes 1Mentoring
Baker-Hughes 3 Hazard ID
Doyon 7 Communication
Doyon 1 Lesson Learned
Doyon 1 Observation
Doyon 1Mentoring
Doyon 6 Procedures
Doyon 4 Good Catch
Doyon 2Stop Work
Doyon 1 Hazard Hunt
GBR 2 Observation
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/22/2023
Report #: 11
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Halliburton 1 Good Catch
Halliburton 1 Communication
Mi-Swaco 1Mentoring
Mi-Swaco 1 Communication
Mi-Swaco 7 Observation
Mi-Swaco 3 Procedures
Superior 1 Procedures
Udelhoven 1 Communication
Vault 1 Observation
Vault 1Mentoring
Worley 1 Good Catch
Worley 3 Communication
Worley 2 Observation
Worley 2 Hazard Hunt
Worley 1 Procedures
Worley 1 Hazard ID
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/23/2023
Report #: 12
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
37.0
Wind
W @ 5 MPH
Days LTI (days)
1,235.00
Days RI (days) POB
66.0
Safety Incidents - Near Miss
Date
5/23/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Confined space. Safety alert of the day: IADC 11-29, Pipe
used as anchorage point on rig floor becomes a projectile. Safety drill of the day: Fire drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 4
BOP Test (pressure)2 5/20/2023 5/27/2023 4
Evacuation Drill 3 5/19/2023 6/16/2023 24
Fire Drill 2 5/18/2023 6/1/2023 9
H2S Drill 1 5/16/2023 5/30/2023 7
Kick Drill 5 5/23/2023 6/6/2023 14
Man Down Drill 1 5/15/2023 8/13/2023 82
Rig Inspection 12 5/23/2023 5/24/2023 1
Safety Meeting 12 5/23/2023 5/24/2023 1
Spill Drill 3 5/21/2023 6/4/2023 12
Strip Drill 1 5/22/2023 6/19/2023 27
Well Kill Drill 2 5/23/2023 6/6/2023 14
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Finish testing cap tube and check valve. Run in hole with 4.5” upper completion from 70’. Perform electrical test every 1000’, continuously test dual cap tube.
24h Summary
Continue pulling out of hole laying down drill pipe from 4,786’ to surface and lay down running tool. Run in hole 19 stands of drill pipe from derrick and pull out of hole and lay down. Rig up to run upper completion.
Make up ESP assembly, shroud and cap tube. Make electrical MLE to ESP cable splice. Make electrical tests, good. Testing cap tube check valve pass through and stabilization pressures.
Operation at 07.00
Run in hole with 4.5” upper completion.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 03:00 3.00 3.00 W.O. K 4 P PJSM. Pull out of hole laying down drill pipe to pipe shed from 4,786’ to 1760’. PU-98 K, SO-100 K. Adding 10 BPH and pipe
displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
03:00 03:30 0.50 3.50 W.O. K 25 P Service pipe skate-replace kicker control switch.
03:30 05:30 2.00 5.50 W.O. K 4 P Pull out of hole laying down drill pipe to pipe shed from 1760’ to surface. Clear floor of running tool and crossovers. Adding 10
BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide, fill pipe every 30 stands.
05:30 08:00 2.50 8.00 W.O. K 4 P Make up mule shoe and run in hole with 19 stands of drill pipe from derrick to 1,740’ MD. Pull out of hole from 1,740’ laying
down drill pipe to pipe shed. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
08:00 14:00 6.00 14.00 W.O. K 20 P Clear and clean floor. Mobilize equipment for running tubing and ESP assembly. Stage tubing hanger and swivel joint. Hang
sheaves in derrick. Stage clamps, job boxes and handling equipment. Mobilize power tongs to rig floor and rig up tongs. Pull
ESP cable and dual cap lines through sheaves in derrick. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl
brine inhibited with biocide.
14:00 17:00 3.00 17.00 W.O. K 5 P Make up ESP assembly. Check free rotation on all component. Service and fill with oil - motor, seal section, tubing cross over
bearing system. Check and fill cap vent and drain plug tightness. ENI Co-man witness.
17:00 18:00 1.00 18.00 W.O. K 20 P Rig up GBR power tongs. Make up shroud.
18:00 19:30 1.50 19.50 W.O. K 5 P Install Dual cap tube and check valves. Connect discharge line to motor gauge. Plug in MLE into motor pothead. Make up
shroud hanger and run in hole to 70’ MD.
19:30 00:00 4.50 24.00 W.O. K 20 P Perform MLE to ESP cable splice and continuity check, ENI electrician witness.
Attempt to test cap tube pressure and check valve.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 237 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 6020 bbls.
24 Hour metal recovered = 0 lbs.
Total metal recovered = 225 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 537.0
Hole 939.5
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/23/2023
Report #: 12
Page: 2 of 3
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Loss 237.0
Cumulative Mud Volumes
Active Volume (bbl)
1,476.5
Hole Volume (bbl)
939.5
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
237.0
Cum Losses (bbl)
6,020.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
ASRC Energy Services Rig clerk 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
GBR Tubing services 12.00 4
Schlumberger MI-Swaco Mud plant 12.00 4
Baker Hughes ESP Crew 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/23/2023
Consumed
617.0
Received
617.0
Returned Cum Consumed
11,278.0
Cum Received
11,278.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/23/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
2,376.0
Cum Received
2,376.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/23/2023
Consumed
440.0
Received
0.0
Returned Cum Consumed
8,804.0
Cum Received
9,552.0
Cum Returned
0.0
Cum On Loc
748.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/23/2023
Consumed
70.0
Received
0.0
Returned Cum Consumed
741.0
Cum Received
810.0
Cum Returned
0.0
Cum On Loc
69.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/23/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
504.0
Cum Received
504.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/23/2023
Consumed
840.0
Received
840.0
Returned Cum Consumed
10,500.0
Cum Received
10,500.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Communication
ASRC 3 Observation
ASRC 2 Hazard Hunt
ASRC 3 Communication
Baker-Hughes 2Stop Work
Baker-Hughes 3 Procedures
Doyon 1Mentoring
Doyon 2 Observation
Doyon 3Stop Work
Doyon 2 Hazard Hunt
Doyon 6 Procedures
Doyon 5 Communication
Doyon 6 Hazard ID
GBR 1 Observation
GBR 1 Communication
Logistics 1 Communication
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/23/2023
Report #: 12
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Mi-Swaco 5 Observation
Mi-Swaco 1Stop Work
Mi-Swaco 2 Communication
Mi-Swaco 1 Procedures
Mi-Swaco 1 Hazard Hunt
Other 1Stop Work
Vault 1 Observation
Worley 3 Communication
Worley 4 Procedures
Worley 1 Hazard Hunt
Worley 2 Observation
Worley 2 Hazard ID
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/24/2023
Report #: 13
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
21.6
Wind
NE @ 23
Days LTI (days)
1,236.00
Days RI (days) POB
65.0
Safety Incidents - Near Miss
Date
5/24/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Competency. Eni Golden Rules with a focus on: Energized systems. Safety alert of the day: BSEE 463,
Adaptation and modification of tools results in injury. Safety drill of the day: H2S drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 3
BOP Test (pressure)2 5/20/2023 5/27/2023 3
Evacuation Drill 3 5/19/2023 6/16/2023 23
Fire Drill 3 5/24/2023 6/7/2023 14
H2S Drill 1 5/16/2023 5/30/2023 6
Kick Drill 5 5/23/2023 6/6/2023 13
Man Down Drill 1 5/15/2023 8/13/2023 81
Rig Inspection 13 5/24/2023 5/25/2023 1
Safety Meeting 13 5/24/2023 5/25/2023 1
Spill Drill 3 5/21/2023 6/4/2023 11
Strip Drill 1 5/22/2023 6/19/2023 26
Well Kill Drill 2 5/23/2023 6/6/2023 13
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Run in hole with 4.5” upper completion from 7,475’ to 9,456’ MD. Make up tubing hanger, swivel joint and terminate lines. Land out tubing hanger, test seals and run in lock down screws. Pull landing joint and clear
floor. Nipple down BOPE. Nipple up tree. Perform passport test and pull TWC. While tripping perform electrical test every 1000’, continuously test dual cap tubes.
24h Summary
Finish testing cap tube and replace #2 cap tube check valve and cap tube extension and fittings. Run in hole with 4.5” upper completion from 70’ to 7,308’ MD. Make ESP cable splice, perform all checks. Continue
in hole to 7,475’ MD.
Operation at 07.00
Making penetrator splice.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:30 4.50 4.50 W.O. K 25 U Trouble shoot cap tube and check valve. Pull ESP assemble up and visually inspect failed check valve fitting. Found that the
cap tubing fitting above check valve leaked when pressure exceeded 2100 psi. Replace check valve assemble and 3/8”
tubing, retest good. Tie in test manifold for dual cap tube lines. Adding 10 BPH and pipe displacement of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide.
04:30 06:00 1.50 6.00 W.O. K 4 P PJSM. Start running in hole from surface to 520’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD
563 internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep
inspect and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10
BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
06:00 12:00 6.00 12.00 W.O. K 4 P Continue running in hole from 520’ to 3,570’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563
internal coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect
and witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and
pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
12:00 18:00 6.00 18.00 W.O. K 4 P Run in hole from 3,570’ to 6030’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal
coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and
witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and
pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
18:00 20:00 2.00 20.00 W.O. K 4 P Run in hole from 6030’ to 7,308’ MD with upper completion with ESP assembly with 4.5”, L-80, 12.6#, HYD 563 internal
coated pipe with CB rings, SO=90 K. Torque turn each connection with GBR power tongs, Superior thread rep inspect and
witness each connection. Perform ESP gauge test every 1000’. Circulate tubing volume every 3000’. Adding 10 BPH and
pipe displacement of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
20:00 23:30 3.50 23.50 W.O. K 25 P Change out ESP cable spool in spool house. Perform ESP splice witnessed by ENI electrician.
23:30 00:00 0.50 24.00 W.O. K 4 P Continue to run in hole from 7,308’ To 7,475’ MD, SO=84 K. Adding 10 BPH and pipe displacement of 8.6 PPG 3% KCL/NaCl
brine inhibited with biocide.
Note:
24 Hour loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 292 bbls.
Total loses of 8.6 PPG 3%KCL/NaCl brine inhibited with biocide = 6312 bbls.
24 Hour metal recovered = 0 lbs.
Total metal recovered = 225 lbs.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/24/2023
Report #: 13
Page: 2 of 3
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 543.5
Hole 907.0
Loss 292.0
Cumulative Mud Volumes
Active Volume (bbl)
1,450.5
Hole Volume (bbl)
907.0
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
292.0
Cum Losses (bbl)
6,312.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
GBR Tubing services 12.00 4
Schlumberger MI-Swaco Mud plant 12.00 4
Baker Hughes ESP Crew 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 25
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/24/2023
Consumed
1,036.0
Received
1,036.0
Returned Cum Consumed
12,314.0
Cum Received
12,314.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/24/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
2,574.0
Cum Received
2,574.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/24/2023
Consumed
566.0
Received
2,667.0
Returned Cum Consumed
9,370.0
Cum Received
12,219.0
Cum Returned
0.0
Cum On Loc
2,849.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/24/2023
Consumed
119.0
Received
135.0
Returned Cum Consumed
860.0
Cum Received
945.0
Cum Returned
0.0
Cum On Loc
85.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/24/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
546.0
Cum Received
546.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/24/2023
Consumed
420.0
Received
420.0
Returned Cum Consumed
10,920.0
Cum Received
10,920.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ACS 1 Communication
ASRC 1 Environment
ASRC 4 Observation
ASRC 3 Communication
Baker-Hughes 4 Observation
Baker-Hughes 1 Communication
Doyon 2 Communication
Doyon 6 Hazard ID
Doyon 2 Hazard Hunt
Doyon 2 Observation
Doyon 1Mentoring
Doyon 4Stop Work
Doyon 5 Procedures
GBR 1 Observation
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/24/2023
Report #: 13
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
GBR 2 Communication
Mi-Swaco 1Stop Work
Mi-Swaco 1 Environment
Mi-Swaco 7 Observation
Mi-Swaco 2 Communication
Other 1 Communication
Udelhoven 1Stop Work
Udelhoven 1 Communication
Worley 3 Procedures
Worley 3 Communication
Worley 1 Observation
Worley 1 Environment
Worley 2 Hazard ID
Worley 2 Hazard Hunt
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/25/2023
Report #: 14
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
23.0
Wind
NE @ 23 MPH
Days LTI (days)
1,237.00
Days RI (days) POB
67.0
Safety Incidents - Near Miss
Date
5/25/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Commitment. Eni Golden Rules with a focus on: Fire safety . Safety alert of the day: IADC, 2-20, Back injury
caused by lifting slings. Safety drill of the day: Kick while tripping drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 2
BOP Test (pressure)2 5/20/2023 5/27/2023 2
Evacuation Drill 3 5/19/2023 6/16/2023 22
Fire Drill 3 5/24/2023 6/7/2023 13
H2S Drill 2 5/25/2023 6/8/2023 14
Kick Drill 5 5/23/2023 6/6/2023 12
Man Down Drill 1 5/15/2023 8/13/2023 80
Rig Inspection 14 5/25/2023 5/26/2023 1
Safety Meeting 14 5/25/2023 5/26/2023 1
Spill Drill 3 5/21/2023 6/4/2023 10
Strip Drill 1 5/22/2023 6/19/2023 25
Well Kill Drill 2 5/23/2023 6/6/2023 12
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Prepare tubing hanger. Install tree and perform Passport test. Finish cleaning pits. Rig down suitcases. Lay liner and matting boards in front of SP10. Build matting board bridge to SP10. Remove burming around
rig. Split pits and sub. Move sub to SP10.
24h Summary
Run in with ESP completion from 7,475’ to bottom of shroud at 9,456’ MD and land out tubing hanger. Perform checks and tests on cable and cap tube. Empty and cleaning pits. Nipple down BOP stack and
equipment. Prepare hanger to install tree.
Operation at 07.00
Rig down passport test equipment. Prep to rig move.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 04:30 4.50 4.50 W.O. K 4 P PJSM. Run in hole with ESP assembly from 7475’ to 9409’, UW 120K, DW 82K, perform ESP electrical checks every 1000’,
pump a tubing volume every 3000’ and maintain 1000 PSI on capillary lines. Perform ESP cable splice, landed out at 20’ up
from pin on joint #184, (1834’ from surface). Note: Splice witnessed by ENI electrician. Adding 10 BPH of 8.6 PPG 3%
KCL/NaCl brine inhibited with biocide.
04:30 06:00 1.50 6.00 W.O. K 5 P Make up swivel joint and orientate tubing hanger, install TWC and make up landing joint, cut ESPcable and prep for
penetrator splice. Adding 10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
06:00 09:00 3.00 9.00 W.O. K 20 P Complete ESP cable splice to penetrator connector. Note splice witnessed by ENI electrician. Connect ESP cable to
penetrator, and terminate capillary lines through tubing hanger. Test capillary voids through tubing hanger to 5000 PSI for 10
minutes all good. Perform ESP electrical checks all good, pump through capillary line, check valve opened at 4249 PSI, and
closed at 2580 PSI. Blow down mud pumps, kill lines and choke manifold. Shipped fluid out of pits, emptying same. Adding
10 BPH of 8.6 PPG 3% KCL/NaCl brine inhibited with biocide.
09:00 10:00 1.00 10.00 W.O. K 5 P Land tubing hanger with bottom of shroud at 9456’, UW 128K, SDW 82K. Run in lock down screws, and test tubing hanger
body seals to 5000 psi for 10 minutes. Perform ESP electrical checks via umbilical, note all good. Remove landing joint,
spool up ESP cable and capillary lines over sheaves back to spooling unit.
10:00 12:00 2.00 12.00 W.O. K 20 P De-mob Baker Centerlift clamp boxes, and thread protectors from rig floor. Rig down pump #3, and power down accumulator.
Clean rig floor, and rig down mud pump interconnects.
12:00 16:00 4.00 16.00 W.O. K 20 P Continue to clean rig floor, clean drip pan, and de-mob equipment from rig floor. Disconnect suit case lines from rig. Empty
mud pits clean pits 3 and 4. Disconnect spooling unit and change out ESP cable spool to empty spool.
16:00 22:00 6.00 22.00 W.O. C 1 P Clean out drip pan under rig floor. Remove bell nipple and flow line. Remove choke and kill HCR and manual lines. Prepare
and set back BOP stack. Remove high pressure riser. Continue cleaning in pits, pill pit #2 and #5. Move suit cases from rig
SP10-FN5.
22:00 00:00 2.00 24.00 W.O. C 5 P Remove high pressure riser. Clean and prepare tubing hanger for tree installation as per Vault hand. Install tree. Continue
removal of suit cases. Continue cleaning pit #5 ,1, 2, pill pit 1.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 0.0
Hole 897.3
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/25/2023
Report #: 14
Page: 2 of 3
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Loss 82.0
Cumulative Mud Volumes
Active Volume (bbl)
897.3
Hole Volume (bbl)
897.3
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
82.0
Cum Losses (bbl)
6,394.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Steve Lawrence ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
GBR Tubing services 12.00 4
Baker Hughes ESP Crew 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/25/2023
Consumed
708.0
Received
708.0
Returned Cum Consumed
13,022.0
Cum Received
13,022.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/25/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
2,772.0
Cum Received
2,772.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/25/2023
Consumed
658.0
Received
0.0
Returned Cum Consumed
10,028.0
Cum Received
12,219.0
Cum Returned
0.0
Cum On Loc
2,191.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/25/2023
Consumed
150.0
Received
65.0
Returned Cum Consumed
1,010.0
Cum Received
1,010.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/25/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
588.0
Cum Received
588.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/25/2023
Consumed
420.0
Received
420.0
Returned Cum Consumed
11,340.0
Cum Received
11,340.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ASRC 2 Communication
ASRC 1Stop Work
ASRC 5 Observation
ASRC 1 Good Catch
Baker-Hughes 2 Communication
Baker-Hughes 1 Observation
Doyon 1Mentoring
Doyon 2 Hazard Hunt
Doyon 2 Observation
Doyon 9 Hazard Id
Doyon 4 Procedures
Doyon 4 Communication
Doyon 1Stop Work
GBR 1 Procedures
GBR 2 Communication
GBR 1 Observation
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/25/2023
Report #: 14
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Little Red Services 1 Procedures
Little Red Services 1 Communication
Little Red Services 1Stop Work
Logistics / Beacon 1 Communication
MI-Swaco 3 Communication
MI-Swaco 1Stop Work
MI-Swaco 6 Observation
MI-Swaco 1 Procedures
MI-Swaco 1 Environment
Other 1 Communication
Udelhoven 1 Procedures
Udelhoven 1 Observation
Vault 1 Hazard Hunt
Vault 1Stop Work
Vault 1 Observation
Worley 3 Observation
Worley 2 Hazard Hunt
Worley 2 Hazard Id
Worley 8 Communication
Worley 5 Procedures
General Notes
Comment:
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/26/2023
Report #: 15
Page: 1 of 3
Well Header
Permit/Concession N°
ADL-388583
Operator
ENI PETROLEUM
Subsidiary
ENI Petroleum Co. Inc.
Initial Lahee Code
DEVELOPMENT WELL
Rotary Table Elevation (ft)
53.67
Ground Level (ft)
13.09
First Flange (ft)
16.82
RKB - Base Flange (ft)
36.85
RKB - Tubing Spool (ft)
31.94
Rigs
Rig Name
RIG 15
Contractor
DOYON
Rig Type
LAND RIG
Rig Num
0723
Rig Start Date
5/10/2023
Rig Release Date
Daily Information
Weather
Overcast
Temperature (°F)
24.8
Wind
NE @ 23 MPH
Days LTI (days)
1,238.00
Days RI (days) POB
68.0
Safety Incidents - Near Miss
Date
5/26/2023
Category Type Subtype Severity Cause Lost time?
No
Comment
HSE focus for May 2023 - Stop Work Authority. No HSE incidents. Reviewed the 7 C's with a focus on: Culture. Eni Golden Rules with a focus on: Health management. Safety alert of the day: SCS 2023-05,
unauthorized removal of insulation. Safety drill of the day: Man down drill.
Safety Drills
Type # Occur Last Date Next Date
Days Until Next Check
(days)
Authority Visit 1 5/13/2023 5/27/2023 1
BOP Test (pressure)2 5/20/2023 5/27/2023 1
Evacuation Drill 3 5/19/2023 6/16/2023 21
Fire Drill 4 5/26/2023 6/9/2023 14
H2S Drill 2 5/25/2023 6/8/2023 13
Kick Drill 5 5/23/2023 6/6/2023 11
Man Down Drill 1 5/15/2023 8/13/2023 79
Rig Inspection 15 5/26/2023 5/27/2023 1
Safety Meeting 15 5/26/2023 5/27/2023 1
Spill Drill 3 5/21/2023 6/4/2023 9
Strip Drill 1 5/22/2023 6/19/2023 24
Well Kill Drill 2 5/23/2023 6/6/2023 11
Casings seat
Cas. Type OD (in) ID (in) Grade Top (ftKB) Bottom (ftKB) TVD Bot. (ftKB) Landing Date
CASING 13 3/8 12.42 L-80 0.0 3,469.5 2,450.8 7/4/2013
CASING 9 5/8 8.84 L80 0.0 12,390.1 3,504.8 7/14/2013
LINER 5 1/2 4.83 L-80 11,502.8 21,130.0 3,594.4 7/25/2013
Last Cementing
Cementing Start Date:7/15/2013 String:CASING, 12,390.1ftKB Comment:
Stg # Top (ftKB) Top Meas Meth Btm (ftKB) Com
1 9,723.0 Acoustic Log 12,390.0 SLB test lines to 3000 psi. Rig pump 100 bbls 10.5 ppg MudPush @ 5 bpm, 340 psi, drop btm plug and SLB mix and
pump 230 bbls 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w/ 923 bbls of 9.4 ppg LSND mud @ 5/3 bpm, 260/ 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Floats held. CIP @ 1700 hrs.
Job Information
Job Phase
WORKOVER
Planned Start Date
5/12/2023 00:00
Start Date
5/12/2023 00:00
End Date
5/27/2023 00:00
P50 Duration (days)
15.00
Daily Summary Operations
24h Forecast
Spot and shim pits. Rig up interconnects. Lower stompers and skid floor to drill position. Spot pump #3. Burm around rig. Take on brine. Bullhead and kill well. Monitor well to ensure dead. Set back pressure valve.
Nipple down Tree. Nipple up BOPE.
24h Summary
Prepare hanger to install tree. Install tree and perform Passport test. Clean pits Lay liner and matting boards in front of SP10. Build matting board bridge to SP10. Remove burming around rig. Split pits and sub.
Move sub to SP10. Spot and shim sub base. Last report for SP36-W5.
Operation at 07.00
Spotting pump #3. Final report on SP36-W5 reporting moved to SP10-FN5.
Time Log
Start
Time
End
Time Dur (hr)
Cum Dur
(hr)Phase Opr. Act. Plan Oper. Descr.
00:00 02:30 2.50 2.50 W.O. C 5 P Clean and prepare tubing hanger for tree installation as per Vault hand. Install tree, and test void to 5000 PSI for 10 minutes.
Good test. Demob scaffolding over suit cases and roof access. Secure top drive and torque tube in rotary table. Continue
removal of suit cases and continue cleaning pits.
02:30 06:00 3.50 6.00 W.O. C 12 P Rig up and perform passport tree testing. Finish moving suit cases from in front of well bay #1. Leveling the pad in front of
SP10-FN5.Continue cleaning pits.
06:00 12:00 6.00 12.00 W.O. A 2 P Change over from highline power to rig power, and spool up highline cable. Lay Herculite liner, and set mats. Disconnect
interconnects below rig floor. Complete rig floor skid checklist, blow down rig floor and pits, steam and water systems. Drain
rig water tank, blow down rig air system, lug down top drive, flip beaver slide, skid rig floor, and raise stompers.
12:00 18:30 6.50 18.50 W.O. A 2 P PJSM. Move suit cases from rig to WIF. Continue to build bridge, separate rig.
18:30 00:00 5.50 24.00 W.O. A 2 P Turn tires and move sub down well bay to SP10 and spot. Spot and shim sub base. Extra shims needed under tires to get
height needed. Lower stompers. Trim shims under sticking out from under sub base. Final report for SP36-W5.
Gas Readings
Avg Background Gas (%)
0.00
Max Background Gas (%)
0.00
Avg Connection Gas (%)
0.00
Max Connection Gas (%)
0.00
Avg Drill Gas (%)
0.00
Max Drill Gas (%)
0.00
Avg Trip Gas (%)
0.00
Max Trip Gas (%)
0.00
Daily Mud Volumes
Tank/Addition/Loss Type Des Volume (bbl)
Tank 0.0
Hole 897.3
Loss 0.0
Cumulative Mud Volumes
Active Volume (bbl)
897.3
Hole Volume (bbl)
897.3
Additions (bbl)
0.0
Cum Additions (bbl)
0.0
Losses (bbl)
0.0
Cum Losses (bbl)
6,394.0
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Steve Lawrence ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Mike Grubb ASRC Energy Services Drilling Supv. siddrilling@eni.com 907-685-0715
Eni representative Yelyzaveta Saprykina ASRC Energy Services Rig Clerk AKRigClerksDoyon15@eni.com 907-685-0722
Tool Push Ryan Pankratz Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/26/2023
Report #: 15
Page: 2 of 3
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Tool Push Andrew Yochum Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Safety Representative Pat Ahern ASRC Energy Services HSE Patrick.Ahern@external.eni.com 907-685-0721
Safety Representative Derek Ambrose Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Safety Representative John Lettow Doyon Drilling HSE rig15@doyondrilling.com 907-685-0796
Personnel Log (POB)
Company Serv. Type Work H (hr) Stand-by H (hr) Count Note
ASRC Energy Services Rig clerk 12.00 1
ASRC Energy Services Lift Advisor 12.00 1
ASRC Energy Services HSE 12.00 1
ASRC Energy Services SOA 12.00 1
Airswift Fueler 12.00 1
Superior Thread Rep 12.00 1
Vault Wellhead 12.00 1
ASRC Energy Services Company man 12.00 2
Schlumberger MI Swaco Mud Engineer 12.00 2
GBR Tubing services 12.00 4
Baker Hughes ESP Crew 12.00 5
Schlumberger MI Swaco WIF 12.00 5
Schlumberger MI-Swaco Mud plant 12.00 6
Worley Rig Support 12.00 11
Doyon Onshore Rig 12.00 26
BOP Stack & Components
Description
BOP Stack
Start Date
1/8/2023
Last Certification Date
12/13/2019
Pressure Rating (psi)
5,000.0
Type Make Model ID Nom (in) P Range (psi) Last Cert Date
Annular Hydril GK 500 13 5/8 5,000.0 4/6/2020
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Blind Shear Ram Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
3 1/2" x 6" VBRs Hydril MPL 5000 13 5/8 5,000.0 12/13/2019
Slow Circulation Rates
Pump Number: Make:Model:
Start Date End Date Liner Size (in) Volume Per Stroke Override (bbl/stk) Max Pressure (psi)
Date Depth (ftKB) Slow Spd Strokes (spm) P (psi) Eff (%) Q Flow (gpm)
Daily Bulk
Supply Item Description:Equipment Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/26/2023
Consumed
1,020.0
Received
1,020.0
Returned Cum Consumed
14,042.0
Cum Received
14,042.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Mud Plant Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/26/2023
Consumed
198.0
Received
198.0
Returned Cum Consumed
2,970.0
Cum Received
2,970.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:Rig Fuel Unit Label:gal us Unit Size:1 Note:
Date
5/26/2023
Consumed
776.0
Received
0.0
Returned Cum Consumed
10,804.0
Cum Received
12,219.0
Cum Returned
0.0
Cum On Loc
1,415.0
Note
Supply Item Description:Rig Water Unit Label:bbl Unit Size:1 Note:
Date
5/26/2023
Consumed
107.0
Received
0.0
Returned Cum Consumed
1,117.0
Cum Received
1,010.0
Cum Returned
0.0
Cum On Loc
-107.0
Note
Supply Item Description:WIF Boilers Unit Label:gal us Unit Size:1 Note:
Date
5/26/2023
Consumed
42.0
Received
42.0
Returned Cum Consumed
630.0
Cum Received
630.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Supply Item Description:WIF Injected Diesel Unit Label:gal us Unit Size:1 Note:
Date
5/26/2023
Consumed
420.0
Received
420.0
Returned Cum Consumed
11,760.0
Cum Received
11,760.0
Cum Returned
0.0
Cum On Loc
0.0
Note
Last Authority Visit
Date
5/13/2023
Tot insp. Nbr Total I.N.C. number Comment
Witnessed by AOGCC rep Brian Bixby.
STOP Cards Submitted
Company # Rpts Com
ASRC 2 Procedures
ASRC 7 Observation
ASRC 1 Unsafe Conditions
ASRC 2Stop Work
Baker-Hughes 1 Observation
Baker-Hughes 1Stop Work
Baker-Hughes 1 Procedures
Doyon 1Mentoring
Doyon 3 Procedures
Doyon 2 Communication
Doyon 7 Hazard Hunt
Doyon 1Stop Work
Doyon 5 Hazard ID
GBR 1 Observation
GBR 1 Communication
Little Red 1Mentoring
Logistics 1 Procedures
Mi-Swaco 2 Procedures
Mi-Swaco 9 Observation
Mi-Swaco 1Stop Work
Udelhoven 1 Observation
Udelhoven 1 Communication
Vault 1 Communication
Vault 1 Procedures
Vault 1 Hazard Hunt
Worley 2 Communication
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCEI: N/A
Daily Report
Date: 5/26/2023
Report #: 15
Page: 3 of 3
STOP Cards Submitted
Company # Rpts Com
Worley 2 Procedures
Worley 3 Hazard ID
Worley 1Stop Work
Worley 4 Observation
Worley 1 Environment
General Notes
Comment:
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Changeout ___
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address: Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes No
9. Property Designation (Lease Number): 10. Field/Pool(s):
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
21813 21130 3596 1055 N/A N/A
Casing Collapse
Structural
Conductor
Surface 2480
Intermediate 4790
Production
Liner slotted
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
N/A N/A
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Stefano Pierfelici 3/30/2023
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Post Initial Injection MIT Req'd? Yes No
Spacing Exception Required? Yes No Subsequent Form Required:
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
AOGCC USE ONLY
Amjad Chaudhry
amjad.chaudhry@eni.com
907-865-3379
Well Operations Project Manager
slotted
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Tubing Size:
L80 9350
4/15/2023
Nikaitchuq Schrader Bluff Oil Pool
3386
PRESENT WELL CONDITION SUMMARY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
0391283, 0388577, 0388574, 0388575
213-082
3700 Centerpoint Drive, Ste. 500, Anchorage, AK 99503 50-629-23492-00-00
Eni US Operating Co. Inc.
SP36-W5
Length Size TVDMD
6890
5210
160
2453
3507
160
3470
Burst
20"
13.375"
160
3470
Perforation Depth MD (ft):
12390
12,390-21,130
5.5"
3,507-3,596
211309597
4.5"
3596
9.625"12390
Form 10-403 Revised 10/2022 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
10-404
BOP test to 2500 psi
Pressure test casing to 1500 psi prior to running new completion.
X
DSR-3/31/23BJM 4/6/23 MDG 4/7/2023
GCW 04/07/23
04/07/2023
Brett W. Huber,
Sr.
Digitally signed by Brett W.
Huber, Sr.
Date: 2023.04.07 09:33:58
-08'00'
RBDMS JSB 040723
3700 Centerpoint Drive Suite 500
Anchorage, Alaska 99503
Stefano Pierfelici
Phone (907) 865-3320
Email: Stefano.Pierfelici@eni.com
March 30th, 2023
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP36-W5 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP36-W5.
SP36-W5 was completed on Spy Island on August 18
th, 2013 with a conventional electric
submersible pump set at a depth of 9,456 MD. This ESP producer was completed without a
packer. The well was started up for production in August 2013. On April 1
st, 2019 an electrical
failure occurred to the ESP failure was occurred and ESP went down. Workover was performed
and well was put back on production, In March 2023 well is shut down because of a suspected
ESP failure.
The estimated date for beginning this work is April 15
th, 2023
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Amjad Chaudhry at 907-
865-3379.
Sincerely,
Stefano Pierfelici
Well Operations Project Manager
SP36-W5 Workover Summary Page
PTD#:213-082
Current Status
Well SP36-W5 is currently down due an electric ESP failure.
Scope of Work
Scope of this workover is change ESP pump.
General Well info
Reservoir Pressure/TVD: This well is expected to have a static max bottom
hole pressure of approximately 1,400 psi (3,447
TVD) during the time of workover.
Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi
BOP configuration: Annular/pipe/blind rams/pipe
TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not
performed. Intermediate
prior to drill out on July 2013.
Well type: Producer
Estimated start date: April 15th, 2023
Drilling rig: Doyon 15
Senior Drilling Engineer Amjad Chaudhry
Amjad.chaudhry@eni.com
Work: 907-865-3379
Well Operations Project Manager Stefano Pierfelici
Stefano.pierfelici@eni.com
Work: 907-865-3320
Procedure:
1. MIRU Doyon Rig 15.
2. Kill well by using (8.6-9.3) ppg 3 % KCl kill fluid through tree.
3. Set BPV. ND tree and NU BOP and test as per AOGCC approved Sundry.
4. POOH and lay down tubing and ESP assembly.
5. MU new ESP assembly and RIH to setting depth. (Note: a possibility that
we will run a middle completion with a packer and 3-1/2 or 2-7/8 tubing just
below ESP setting depth to increase velocity of the fluid)
6. Land hanger and test it.
7. Install BPV and nipple down BOP.
8. NU tubing adapter and tree.
9. Pull BPV, install test plug and test tree. (5000 psi test)
10. Freezes protect through tree down IA.
11. RDMO.
Below the current schematic of the well:
Run test packer and
Pressure test casing to
1500 psi prior to installing
new completion. -bjm
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________NIKAITCHUQ SP36-W5
JBR 06/16/2023
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:0
Tested with 4 1/2" and 5" test joints, tested all gas alamrms and PVT's, Precharge Bottles = 36 ea. All at 1000psi each.
Test Results
TEST DATA
Rig Rep:V. TorresOperator:Eni US Operating Co. Inc.Operator Rep:B. Simonson
Rig Owner/Rig No.:Doyon 15 PTD#:2130820 DATE:5/13/2023
Type Operation:WRKOV Annular:
250/3500Type Test:INIT
Valves:
250/3500
Rams:
250/3500
Test Pressures:Inspection No:bopBDB230515155910
Inspector Brian Bixby
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 4
MASP:
1055
Sundry No:
323-192
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.P
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
FSV Misc 0 NA
15 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 13 5/8"P
#1 Rams 1 3 1/2"x6"P
#2 Rams 1 Blind/Shear P
#3 Rams 1 3 1/2"x6"P
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 2 3 1/8"P
HCR Valves 4 3 1/8"P
Kill Line Valves 2 3 1/8"P
Check Valve 0 NA
BOP Misc 0 NA
System Pressure P3000
Pressure After Closure P2150
200 PSI Attained P10
Full Pressure Attained P51
Blind Switch Covers:PYES
Bottle precharge P
Nitgn Btls# &psi (avg)P10@3800
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
0 NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P16
#1 Rams P9
#2 Rams P8
#3 Rams P8
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P3
HCR Kill P3
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
JUN 0 3 2019
r% � '�- I .
1. Operations Abandon Ll Plug Perforations LJ Fracture Stimulate Li Pull Tubing s Operati6n5 Shutdown
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: _ESP Change -out_ ❑'
2. Operator Eni US Operating Co. Inc.
4. Well Class Before Work:
5. Permit to Drill Number:
Name:
Development 0 Exploratory ❑
Stratigraphic ❑ Service ❑
213-082
3. Address: 3800 Centerpoint Drive, Ste. 300, Anchorage, AK
6. API Number:
99503
50-629-23492-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
0391283, 0388577, 0388574, 0388575
SP36-W5
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Nikaitchug Schrader Bluff Oil Pool
11. Present Well Condition Summary:
Total Depth measured 21813 feet Plugs measured N/A feet
true vertical 3386 feet Junk measured N/A feet
Effective Depth measured 21130 feet Packer measured N/A feet
true vertical 3596 feet true vertical N/A feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 160 160
Surface 3470 13.375' 3470 2453 5210 2480
Intermediate 12390 9.625' 12390 3507 6890 4790
Production
Liner 9597 5.5" 21130 3596 Slotted Slotted
Perforation depth Measured depth 12390-21130 feet
True Vertical depth 3507-3596 feet
Tubing (size, grade, measured and true vertical depth) 4.5 L80 9326 3192
Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Wafer -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 861 40 1019 0 1 274
Subsequent to operation: 1253 68 1383 -7 304
14. Attachments (required per 20 AAc 25.070, 25.o71, a 25.283)
15. Well Class after work:
Daily Report of Well Operations
Exploratory ❑ Development Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil E Gas L WDSPL LJ
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
319-172
Authorized Name: Stefano Pierfelici Contact Name: Amjad Chaudhry
Authorized Title: Well Operations M a er Contact Email: ami ad.chaudhrvGBeni.corn
`Pro'ect
Authorized Signature: Date: 06LO !L- U Contact Phone: 907-865-3379
Farm 10404 Revised 4/2017j'�' �t�4 3BDMS 4CvJUN 0 3 2019 Submit Original Only
Surf. Casing
13-3/8", 68 #
370' MD, 2,453'
TVD
81° Inc.
11,219' MD, 3426'
TVD — L1 - Baker
SLXP Liner
Hanger/Packer
Resman Oil/Water Trace
Sub #3
11,533' MD\
3,457' TVD -
Baker SLXP
Liner Hanger/
Packer _
Item LS
MD ft
2" Swell Pkr#1
19283
1/2" Swell Pkr#2
17980
2" Swell Pkr#3
11/2"
16714
2" Swell Pkr #4
15583
" Swell Pkr #5
13992
2" Swell Pkr#6
12363
Swell Pkr#7
11493
4 % Swivel Joint
4'/2" L80 12.6 THW563 ppf Production Tubing
4-Y" x-cplg cable clamps, for ESP
Power Cable, (1) 3/8" Chem Inj Line
9,378' MD, 3,197' TVD - Discharge Gauge Sub
#M
ani p®rro�eunm
SP36-W5
Dual Lateral Producer
with conventional ESP
As Completed
04/25/2019
9,436' MD, 3,204' TVD, 831 Inc — Bottom of Motor Centralizer
Centrilift, Flex47 ESP 93 stage SXD pump, 513 GSB3 seals, 250HP 562XP 200/3635/34_167/
3030 08R motor
11,437-11,454' MD, Resman Oil/ HAL 5-1/2" Oil Swell
Planned Casing Exit Water Tracer Sub Packer
Window / #2 ,
Resman Oil/Water
Sub #1
Item MD ft
Resman tracer Sub #1- ROS 683 / RWS 751 123
Rosman tracer Sub #2 -ROS 682 RWS 750 1241
Rosman tracer Sub #3 -ROS 681 RWS 749 1
Field —Spy Island
Interm. Casing
9-5/8", 40# HAL 5-%" Oil Swell
12,390' MD, 3,507' TVD Packer
87° Inc.
Slotted Liner,
5-'/2" Silver Bullet Ecc. 5-%" 15.5 ppf
Nose Guide Shoe with 20,651' MD, 3,568'
Bent Joint TVD
89° Inc.
TD
20870'
o MD/
3546'
n TVD
5 '/_" Silver Bullet
Nose Guide Sh
21813'
MD/
3396'
TVD
Slotted Liner,
5-1/2" 15.5 ppf
21,130' MD, 3,596' TVD
95° Inc.
MD ft
1/2"#1
21087
1/2"#2
20226
aPkr#1
2" #3
18669
2"#4
17532
5- 2"r#5
16861
" #6
15230
2" swell lip
1 14039
5 '/_" Silver Bullet
Nose Guide Sh
21813'
MD/
3396'
TVD
Slotted Liner,
5-1/2" 15.5 ppf
21,130' MD, 3,596' TVD
95° Inc.
Well Name:S OR
Wellbore Name: e: SP36-W5 S
Well Code: 27335
® ' Job: WORKOVER
WCER Level:
Daily Report
Date: 411712019
Report #: 1
Page: 1 of 2
Well Header
Permit/Concezai. N° eralor Subsidiary Initial Lahee Code
AUwSKA ENI PETROLEUM ENI Petroleum Go re, DEVELOPMENT WELL
Rotary Table Elevation (RI Ground Level th) First Flange lk) RKB-Base Flange in) RKB Tubin9 Spool(h)
53.67 32,805.12 1682 36.85 31.90
Rigs
Rig Name Corrector Rig Type Rig Num RIB Start Dab 0.ig Release Oate
RIG 15 DOYON LAND RIG 0]23 4n02019
Daily Information
WeatherTemparaturs j -F) Wind Days LTIhays) Days Rl (tlays) POB
Overcast 68 N®17 MPH 543.00 54300 90.0
Safety InCidents - Near Miss
Data Category Type Subtype Severity C.... Lost time?
Comment
Safety Drills
Days Until Nert Check
Type
dOccur
Last Date
Next Date
in,)
Rig Inspection1
4/1]12019
.[812019
1
Salty Mee5n9
1 4/1712019
4/1812019
1
TT H23 Drill
1 4(1]12019
7,1512019
90
Casings seat
Cas.Type
Do (I.)
to (in)
Grade
Top("")
Bottom NUKE)
TVD Rot (kK6)
Run Date
ING
13318
12,42L-80
0.0
3,46.5
2.4508
71412013
CASING
9 518
6,84
L00
O
O 12,350.1
3.504 8
711412013
LINER
5 112
4.83
L-00
11.502.8
21,130.0
3,594.4
7125/2013
Last Cementing
Camenting sta t Data: 7/152a13 String: CASING, 12,390.1kK3
Comment:
atgg Tail
I Top Meas Men
BM ptl(H)
Cont
1 9,723.0
Acoustic Log
12,390.0
SLB last /hies M 3000 psi. Rig pump 100 bbl. 10.5 ppg MudPush 5 bpm, 340 psi, drop bull plug end SLB .,.and
pump 230 batik 12.5 ppg DeepCreR cement @ 4 B ppg, 550 psi, drop top plug and kick one wl 10 ads of walar. Rig
displam w, 923 able x19.4 pill LSNO mud® SB bpm, 2601820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Flak held. CIP @ 1700 his.
2
Job Information
Job Phase Plennad Start Data End Dela P50 Duration (days)
Japanese,
WORKOas 418,201900:00 .1]201910.00 Dao
Daily Summary Operations
24b Forecast
Spot and dg up pit system. Skid no Som. Lower stompers. Remove traveling mat boards. Set and rig up mud pump 43, rock washer generator k5, HeRlbudon Shark. Bum In rig
2" Summary
Pull sub away from NN01. Lay Hurwlge and mat boars. Center over SPW and spot sub. Stage Pik dose to sub.
operation at 07.00
Continue to Moya In Rig Up.
Time Log
start Endtumour
Time Time Due (be) (h, Phase Opc Act, I Plan Oper. Draw,
1330 1]'30 4.00 000 W.O. A 2 P PJSM, pull pe of NN -01. Prepare pad fm Haradhorn front of SP36. web Hecuba, and leymals.
1730 tS30 1.00 500 W.D. A 1 P Move over and center sub mod on SP36.
1830 2230 4.00 9.00 W.O. A 1 P Mev. sub over well bey, 5037 things to Cbc ran s"d n for lubricator cap mane An too tall above roof, wou ! not be able W
sat down on mat boards. Pull away from well bay end well hand replaced spear with parted flange. lowamg be. mot time
Finish laying mal boars. Stage pits close W sub
22:30 OO:Op 1.50 10.50 W.O A i P Signs sub over SP36. spot pits closer to sub.
Gas Readings
Avg Background Gas (°F)
Max BacM9round Gas (%)
Avg Connection Goa (%)
Max Connection Gas (°k)
Avg Drill Gas (%)
Max ural Gas (%)
Avg Trip Gas (%)
Mex Trip use (%)
Cumulative Mud Volumes
Ac We Volume thin Hole Volume (bull Additiona(bbl) CUM Additions(bbl) Losses (bull Cu. Losses(bbg
Daily Contacts
Position
Contact Name
Company
This
Email
Office
Mobile
Ent re,seramalive
3dmane Seaman
Eni
Undifing Supv.
siddrilfng@enLcore
907685-0]15
Eni representalNe
Mary Guarino
Ent
Orlin Supv.
Marco.Guanno@oni.cam
Enirepreumalbe
Mike Grubb
Em
Desire, Sups.
sinnlfng@ampdeSerse oom
9076854715
Eni representat.
AssureaMro Tuhmo
Eni
Fluid Supervisor
Era representative
Wada Thmnas
Eni
Rig Client
AKRIgCkhk.Doyonl 5@ercum
90]685-0]22
End represealmo,
Mer Hunts,
Ent
HSE
Eni rcpassionless
Cory Houghton
Eni
HSE
Tod Part,
Justin Hays
Doyen Drilling
Tool Pusher
rtgi5@doyondn1kng...
Tool Push
Einer Fle rgle
Doyen Driigng
Tool Push
Tool Push
CRICearu
Doyon Drilling
HSE
ens®doynndelMg corn
68s07%
Tool Push
Isconsiparger. I
Doyon Drying
IHSE
Personnel Log (POB)
Company
Be'. Type
Work H(he)
Stand -0y H the)
Count
Note
yon
Feed Supermtendent
12.50
0 04HIM
ASRC
Company Man
Use
1 Culling
ASRC
Clam
12.50
1 Dulling
ASRC
BOA
12.50
1 SIO Support
ASRC
Crane Ar Msor
12.50
1 SID Support
Heawn
Media
12.50
1 SIDSuppou
End
Company Men
12.50
1 Drulaig
Northern Oiffefd SeMaar
Faster
12.50
1 SID Support
Vatco(BHGE)
Weighed
12.50
1 Cable,
Eni
Finds Supervisor
12.50
1 Dnlfng
Daily Report
Date: 4118/2019
Report #: 2
Page: 1 of 2
Well Header
Well Name: OR
Wellbore Name: me: SP3 SP36-W-W5
0, war u 141ary Initial Lahee Code
Well Code: 27335
ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Job: WORKOVER
enni
WCER Level:
Daily Report
Date: 4118/2019
Report #: 2
Page: 1 of 2
Well Header
PermibConcessicn N°
0, war u 141ary Initial Lahee Code
ADL -388583
ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Pusher, Table Elevaeon (h) Grvuntl Level (ft) FEst Flange (k) RKS -Ease Flange tripRKR Tubing spool no,
53.67 32,805.12 16.82 3685 31.84
Rigs
D Nome GonlracWe RIg Type ftlg Num Rig Star/ DaM Rig Release Data
RIG 15 DOYON LAND RIG OT23 4/11112019
Daily Information
Weather Temperature l°FI Ww% Days(days) oat's Rl (days) POS
Cloudy 1.4 W @ 9 MPH 544.000 544.00 96.0
Safety incidents- Near Miss
pate Category Type Subtype sevttlly Cause Lost Omer
Comment
Safety Grills
Days Until Ne at Check
Type
X occur
last Date
next Data
Itlaysl
Rig Inspection
2 411012019
4/1912019
1
Safety Meeting
2 4I1W2019
411912019
I
L
TT H2S DrA
1 411]12019
711612019
89
Casings seat
Cas. Type
OD (in)
IO Iinl
Grade
Top IftKBI
Bottom MKBI
TVD Bot. (fiKB)
Ron Date
CASING
133/8
12A2
L-80
00
3.469.5
2,4508
7/a2013
CASING
9518
BBd
L80
90
12,39D.1
3,509.8
7/1a2013
LINER
5112
4.83
L-80
11,502.8
21,130.0
3,594.4
]252013
Last Cementing
Cementing StartDate: 7/152013 Stang: CASING. 12.390.1hKS Comment:
atg # Top (ftKB)
I Top Mesa MethCom
Sbn (ftKB)12,390.0
1 9,723D
ACrUSIC Log
SLB test Imes is 3000 psi. Rig Pump 100 PER 10.5 ppg MudPmh @ 5 bpm. 340 psi, dreg btm plug and SLB mu and
pump 230 but, 12S ppg DeepCrets cement @ 4.0 pP9, 550 psi, drop top plug and kick out w/ 10 bbls of water. Rig
displace w1923 table of 9A ppg LSND mW @ M bpm, 260/ 020 Psi. Bumped plug and Pressure up to 1320 psi and
hold for 10 min. Foals held. CIP @ 1700 has.
2
Job Information
JOE Phase Plennetl start Date Start Date End Data PSO Duration (days)
WORKOVER a&201800:00 a172p181000 99D
Daily Summary Cperapons
24h Forecast
Kill well. NAD well head and N/U BOPE. Test ROPE.
21U
Spot pump complex, lower stompem. Spot pump #8, VFD house. Generator b5, rock washer and suit mass. Its up mud lines, electrical to mud pump #3. Rig up Inter connects. Spray down PIIS as a final clean
before bringing time into pits. Hook up suit cases and build including access to VFO and generator #5. Test lines and therefor 9.0 pp0 bane Into pit from mud plant. Rig up Imes Rom ng pumps is tubing and IA.
Opera6en at 07.00
Prep for WD Trans. NN ROPE
Time Log
End
Co. our
Time our (hr)
(m)
Phase
Opt.
Act
Plan
Quer. Descr.
02:00 2.00
2.00
W.O.
A 1
P
8polpumpcomplsx.
NCO 2.00
400
W.O.
A 2
P
Lower stamper andudd g Dor Mo wok pai
16:30 12.50
16.50
W O.
A 1
P
Remove top drive ag move pup secu sing for travel. Rig up tmall line, choke Ane and Samoa Imes under ng floor. Rig up mud
Imes and secondary NA in pump mem IMenonmd. Plug in electrical lines between pits and sub base. Spot Pump 93. ng up
mud and power Imes m pumpaQ.11 up rgpowerto shop. Insist last suitensunentam0ar. Install Choke and gas buster
rGa$
stack on roof. Spot generator #6 and mW Camp WD. Install service Anes n muck washet. Stan burning abound rig.
20:00 3.50
2000
W O.
A 1
P
Rinse and second cleaning of mud DAs. nstail valvas on Re pump #3.Tg up .it cases. Build sceffclding around generator
95 and VFD house. Rabe luddi ing auppons in pile shed. Power up lights and camera in mttb chute. Hook up skate controls
to ng floor.
0000 4D0
2400
AD
L 6
P
Test transfer lines from mud plant to ph, Fis pita with 9. ppg bone frau mud plan. Build 16 b ils of 9 0 ppg hi'is sweep for
bull hmdkg annulus. Rig up lines ham ng pumps to Wbirg mW IA for mal MII operation.
atl/ngs
Avg Background Gas 1%) Max Background Gas 1%)
Avg Cormectlon Ges 1%)
Max Connection Gm (%)
Avg Drill Gas I%) Max Disk Ga. (%I
Avg Tap Gas (d
Max Trip Gas ( )
Daily Mud Volumes
TanWAtltli[ipnlLoss Type Des Volume @w)
Tank
904 0
00
Loss
Hole
1.044.0
Cumulative Mud Volumes
Active Volume (bbl) litVowme (bbg Additions (bbl) Cum Publishers /bbl) -ase- (bw) Cum Losses (bwl
11948.0 i.OM.O 0.0 0.0 0.0 0.0
Daily Contacts
Position
Contact Name
Company
Title
Email
-9O-7E85
Mo.
Mobile
Eni representative
Simone Belemmi
Eni
OMing Sup,
Rdm1[Rg@xm..rn
715
Eni representative
Marco Guarino
Eni
Drilling Sup,
MancouGuanno@xseconn
Ent represardi
Mike Gmbh
Ed
Drilling Supv.
abddling@mlCetroleum.mm
901
Enl represeMaWe
Alessandro Tutano
Eni
Fluid Supervisor
EM representax.
Waite Thomas
Eni
Rig Clerk
AKRgCbrksOayonl 5@uccom
WOMBSOT22
ERI representative
Mak Hubler
Eni
HSE
EW repreasntative
Cay Haughton
Em
HSE
Tod Push
Justin Hays
psych Drilling
Tool Pusher
rirs@doyondMling.com
Tod Push
Einer Fbagle
Doyon Drying
Tod Push
Tod Puah
Cliff Orem
Doyen Drilling
HSE
cosem@doyeadMilnycon
605-0796
Tool Push
Scott Smmom
Doyon DMAhg
HSE
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4118/2019
Report #: 2
Page: 2 of 2
Personnel Log (POB)
Company
San. Type
Work H(hr)
SUVFtay H(M)
Count
Note
Doyon
Field Superintendent
1250
0
Drilling
Halliburton
ECO
12.50
0
Drilling
ASRC
Company Man
1250
1
Dnlling
ASRC
Ckdc
1250
1
Dnlling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
EnI
Company Man
12.50
1
Drilling
Northern OMeild Services
Feeler
12.50
1
SID Support
Voted(BHGE)
WellHead
12.50
1
Drilling
Eel
Flultls Supervisor
12.50
1
Got,
ACS
Enummingmal
1250
2
SID Support
Became
HSE
12.50
2
SID Support
Doyon
Tool pushers
1250
2
Drilling
Doyon
HSE
12.50
2
Drilling
Halliburton
Mud Loggers
12.50
2
Dnding
MI Swam
Mud Engineer
12.50
2
Drilling
SLB
Cement
12.50
2
Drilling
Compounds
Logbfic
12.50
4
SID Support
MI Swum
Mud Plant
12.50
6
Drying
Purcell
Security
12.50
6
SID Support
Ml S.U.
WIF
12.508
SID Support
ESS
Catering
12.50
10
SID Support
Jambs
Truck driver l Crane operator
12.50
14
Drilling
Doyon
Rig Personnel
1250
25
Initial Drills, Personnel 65
BOP Stack 8 Components
Description
Start Dote
Last Certification DatePressure Rating(MI)
Type Mak¢ Model
IO Npm (in)
P Renge (pad,last Cott Date
Slow Circulation Rates
Pump Number: Make:
Madel:
Start Data I End Date
Liner Size (in)
Volume Per Sfmke Overrate (bbllstk) Max Pressure (Mil
Date Depth IRRB)
Slow Spd
Simon (am)
P (MI)
EH (%) O Flow (Sam)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gat
Unit Slze: 1
Note:
Date Consumed Recelved
Returned
Cum Consumetl Cum Rmeivetl
Ctun Rammed
Cum On tnc Note
41172019 1,2430 12430
2,on
2.4500
0.0
O.o
Supply Item Dezctlpdm: Mud Sam Boilers
Unit Label:
Gal
Unit Size:
Note:
Date Consumed Received
Returned
Cum Consumed Cum Reserved
Cum Returnetl
Cum On Lm Nofe
411&2019 42.0 42.0
890
840
0.0
0.0
Supply Item Descdpdom Rig Fuel
Unit Labi
gal us
Unit Size: 1
Note:
Det. Consumed Recelved
Returmd
Cum Cmalmned Cum Rmeivetl
Cum Returned
Gum On l.oc Note
41182019 1.]23.0 3.8000
3,111.0
14.586.0
0.0
116750
Supply lower Description: Rig Water
Unit LabM:
bbl
Unit Size:1
Note:
DMe Consumed Received
1amuread
Cum Consumed Cum Received
Cu. Returned
Cum On Loc Note
411WO19 230 1.11
23.0
135.0
00
112.0
Supply lbm DesMptlon: WIF Boden
Undiluted:
Gel
Unit Siu:
Note:
Data Con sumedRecelved
ReWrrretl
Cum Consumetl Cum Receivetl
Cum Returnetl
Cum On Loc Floor
4/1812019 198.0 198.0
388.0
3%,0
0.0
0.0
Supply Item Description: WIF Injected Dorsal
Und Labid:
Gal
Unit Sin:
Note:
Dale Consumed Receivetl
Relumed
Cum Consumed Cum Receivetl
Cum Returned
Cum On Loc Nofe
41182019 840.0 8400
1,260.0
1,2690
0.0
0.0
Last Authority Visit
Date Tot imp. Nor
Total I.N.C. number Comment
STOP Cards Submitted
Company
a Rpts
Cpm
Doyon Drilling
S
PJSM'S
Doyon Onlling Inc,
8
COW
Doyon Dnlfng Inc.
21
We Cards
Doyon DMIM, lnc.
8
HRWS
MI Swam
6
HARGJSA
MI Swam
8
MIT,
General Notes
Comment:
Daily Report
Date: 4/19/2079
Report #: 1
Page: 1 of 2
Well Header
Well Name: SP36-W5
Wellbore Name: SP36-W-WS
0loratar Subsidiary Initial Lahee Code
Well Code: 27335
aa
Job: WORKOVER
en II
WCER Level:
Daily Report
Date: 4/19/2079
Report #: 1
Page: 1 of 2
Well Header
Permlticoncession N°
0loratar Subsidiary Initial Lahee Code
AOL -388583
ENI PETROLEUM ENI Petroleum CO. Ina DEVELOPMENT WELL
Rotary Table Eleven..hi) Ground Level in) First Flange Mi RKB - Base Flange(K( RKB- Tubing OF., I-1
5367 32,805.12 16.82 mos 31.94
Rigs
R{p Name Coneactor Rig Type Rig Num Rig Start Data Rig Release Date
RIG is DOYON LAND RIG 0723 41102019
Daily Information
WeatherTemperature PF) Wind Days LTI(days) Days Ed (days) PCB
Overcast 6.8 E@4MPH 545.00 545.00 1050
Safety Incidents - Near Miss
Data Category Type Subtype Sevedy Cause Lost timer
Comment
Safety Drills
Days Un(, Next Check
Type
pIXGm
"Stoats
Next Date
(Slays)
Rig Inspection
3 4I19I2019
42012019
t
Safety Meeting
3 411W2019
42012019
1
TT Ha DMI
1
4/1]12019 ]11612019
08
Casings seat
Can. Type
OD lint
I ID bol
Grade
To, QKB)
I Bottom (10013)
TVD Bot.(bKBI
Run Data
CASING
133/6
1242
L60
0.0
3.489.5
2.450.8
]Ia203
CASING
9518
8.84
LSo
0.0
12.390.1
3,504.8
]/14/2013
LINER
512
4.83
L-80
11,502.8
21,130.0
3,594.4
7/252013
Last(
cementlng Start Data: ]/152013 Strirp: CASING, 12,390.1,08 Comment:
Sign
Top IRKBI
I Top Meas Mean BM (RKB)
Com
1
9.]23 0
011mc Log 12.380 0
SLB Last Ilnas to 3000 Pei. Rig pump 100 bbls 10.5 Mpg MudPush 5 bpm, 340 psi, drop ism plug and SLB mix and
pump 230 Was 12.5 ppg DeepCrete cement @ 4.8 also. 550 poi, drop OF plug and kick out wl 10 bbls Of water. Rig
displace w/ 923 bbls of 9.4 ppg -SND mud @ 513 bpm, 26W 820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min Monte held. LIP a 17N hre.
2
Job Information
Job PhasePlanned Start Oats Start Dab End Data PSO Duration (days)
WORKOVER a0201e MoD 4/1]1201910:00 0.00
Daily Summary Ope;mt ns
2" Forecast
Finish WU SOPS. Test BOPS. Prepare to decomplete.
241h Summary
Rig up lines on well head Bull head and kill wall 9.8 ppg brine. Set BW and Nipple down Vee. Nippling up BOPS.
Cpersdor at 07.00
Testing ROPE
Time Log
Start End cum Our
Time Time Dur(hr) (m) Phase ops, Act. Plan Open. Descr.
woo 01:00 1 00 1.00 W.O. P 1 P Rig Upon well or bull head ipwetlin. Tess surface line b 2000 pn r 10 min.
01:00 0500 4.00 5.00 W.O. A 1 P Bull head 180 bbta of 9.8 ppg brine Slosh tubing, alleging up to 5 bpm at 800 psi dropping to 650 gni. Tubing an vacuum after
pumping down tubing. Line up to Aannulus Pump 16 Not 98 ppg hi -vis pill and shin chasing with 98 ppg bone staging up to
6 bpm .1 450 psi dropping b too pat. Annulus on vacuum after pumping.
05 VO 06 00 1.00 6.00 W.0 A 1 P Monitor Tubing and Annulus pressure. Both side slightly on vacuum. SIMOPS: spot mud engines, shark.
0690 07:30 150 7.50 W.D. A 1 P R1U lubricator and Set BPV.
0730 0830 100 850 W.O C i P RID lubricator. Remove well head off a r,. P/U high pressure eL M Vee. SIMOPS'. spot hallibu tan mud Mill unit
W 30 10:00 1.50 1000 W O. C 1 Is et VG tack in BW inside tubing hanger. Imbti choke line adapter on BOP.
10:00 0000 14 00 24.00 W O. C 1 P PJSM, Set VG lack on BW inside Sher, hinges. Metati choke line aspirant, Nipple up BOPE. Set BOP sick an mon, torque
bolls. Install Manual and HCR valves on choke and fill line. Build berm and spot accumulator. power up acwmulator. install
primary and secondary choke and IMI lines on BOP stapK Install Accumulator hoses to BOP. Rig up May line and flow fire
user. Prepare shed and sties it lift for 4 W tubing M pipe shed Remove Cmlolus from put and box up.
Gas Readings
Avg Background Gas (%) Max Background Gas (%)
Avg Connection Gas VAI
Max Connecson Gas (Y°)
Avg Ddll Gas (%) Max Ont Gas I%)
Avg Tip Gae (°61
Max Trip Gas 1%)
Daily Mud Volumes
TanklAdditioMoss Type Oes Volume lbbg
Tank
65].0
Loss
126.0
Role
19044 0
Cumulative Mud Volumes
ActNe Volume (bhp Hole Velum. (660 Additions (bbl Cum AddMons MAN) Ling es, Mb0 Cum Losses (1,M)
1,701.0 1,044.0 0.0 00 126.0 126.0
Daily Contacts
Position
Contact Name
Company
Tide
Ercall
Office
Mobile
Eni representative
Simone Belemmi
EM
Drilling Sup¢
siddMling®aol.com
907.565-0715
Eni representative
Mary Guarino
Eni
Drilling Sup,
Ma=.Guadno@eni.com
Eni representative
Mike Grubb
Ent
Drilling Supv.
sidddlling@anipetraMum.com
907.605,0715
Ent representative
Alessandro Tutano
End
Fluid Supervisor
End representalne
Wetle Thomas
ES
Rig Clerk
AKRgClerksDopril 5®eni.com
90)685-0]22
End representative
Mark Hubler
ES
HSE
end representative
Cory Houghton
EM
HSE
Drilling S.N.
$am Dye
Doyon Drafting
Field Superintendent
Tool Push
Justin Hays
Deign Drove
Tool Pusher
1g15todiymtlralin9wm
Tool Push
Elnef Fleagta
Doyon Dulling
Tial Push
TOM Push
Cliff Opens
Doyon Drilling
HSE
cowens@doyonddling.com
685-07%
Tod Pooh
Scott Sermons
jDayan Drilling
HSE
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/19/2019
Report #: 3
Page: 2 of 2
Personnel Log (POB)
Company
Serv. Type
We* HIII
Standby H(or)
Count
Note
Iliburion
ECD
1250
0
Drilling
ASRC
Company Man
1250
1
Dtllling
ASRC
Clerk
1250
1
Drilling
ASRC
SOA
1250
1
SID Support
ASRC
Crane Aemor
12.50
1
SIO Support
Beacon
Medic
12,50
1
SID support
Doyon
Fent Superintendent
12.50
1
Drilling
End
Company Man
12.50
1
Dtllling
Norham Oduld Services
Fmer'
12.50
1
SID Support
V.I.(BHGE)
WeIIHead
12.50
1
Drilling
End
Finds Superveer
12.50
1
Drilling
ACS
Enviromental
12.50
2
SID Support
Season
NSE
12.50
2
SID Support
Doyon
Tool push..
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
Helliburbn
Mud Loggers
12.50
2
Dtllling
MI Swaw
Mud Engineer
12.50
2
Drilling
SLB
C .... t
12.50
2
Drilling
GSR Casing
Casing Service
12.50
3
Drilling
Computed.
Logistic
12.50
4
SID Support
Baker Cenirdlift
Completions
12.50
5
Drilling
MI Sweco
Mud Plant
12.50
6
Drilling
Purcell
Security
12.50
6
SID Support
Ml Swam
WIF
12.50
8
SID Support
ESS
Catering
12.50
10
SID Suppod
Jawps
Truck driver I Crane operator
12.50
14
Drilling
Doyon
Rig Personnel
12.50
25
Dtllling Total Onlling Personnel 74
BOP Stack 8 Components
Description
Start Data
Last CetlHlCation Data Pressure Rating (psi)
Type Make Model
ID Nunn (I.)
I
PRas, last) Last Cert Dairy
Slow Circulation Rates
Pump Number: Make:
Model:
Start Dab End Data
Liner Size (in) Volume Per Stroke Override(bblls*) Islas Pressure(psd)
Data
Depth (WB)
Slow Spot
Spokes lagoon) I
P(ps0
EH (%) 0Flow igpm)
Daily Bulk
Supply Item Drucinqua to Equipment Fuel
Unit Label: Gel
Unitsion 1
Nob:
Dale Consumed
Receivetl
Returned Cum Consumetl Cum Received Cum Returned
Cum On L.ec Note
4/1912019 1,1670
1.i6L0
3637.0
3,63]0 0.0
0.0
Supply Itam Description: Mud Plant
Boilers
Unit Uml:
Gal
Unit Size:
Note:
Data Consumed I Received
ReturneeCum
Consumed Cum Receivetl Cum Returned
Cum On Lee Note
4/1912019 42.0 42.0
126.0
126.0 00
0.0
Supply Ilam Description: Rig Fuel
Unit Label:
gal ua
Unit size: 1
Note:
Data Consumetl Receivetl
Returned
Cum Consumetl Cum Received Cum Returned
Cum on Loc Note
4/1912019 1,9650 00
5.0760
14,566.0 0.0
9,510.0
Guppy Item Danymption: Rig Water
Unit Label:
tort
Unit Size:1
Note:
Data Consumetl Receivetl
Returned Cum Consumed Cum Received Cum Returned
Cum On Loc N019
4/1912019 450 135.0
680
270.0 00
202.0
Supply Ron Description: WIF Bailers
Unit Label: Gal
Unit Size:
Note:
Date Consumetl Received
Rebmed Cum Consumed Cum Received Cum Returned
Cum On Loc NWe
4/1912019 1980 198.0
MIND
5940 00
0.0
Supply Item Description: WIF loj.cbtl Diesel
Unit Label: Gal
Unit Size:
Note:
Oat. Consumed Received
Returced Cum Consumed Lom Received Cum Returned
C.0
Cu. On Loc Note
4/19,2019 6400 8400
2,1000
2,1000
0.0
LastAurnonty visit
Data Tot imp. Nbr
Tobi I.N.O. number Comment
STOP Cards Submitter
Company
B RPM
Com
Doyon Dntldng
8
PJSM'S
Doyon Dntldng toe.
21
Safe Cares
Doran Dntldng Inc.
8
cow
Doyon Drilling Inc.
8
HRWS
Ml Swaw
6
HARCIJSA
MI Swaw
8
RIWs
General Notes
Comment:
Well Name:S OR
Wellbore Name: e: SP
SP36-W-WS
Well Code: 27335
Job: WORKOVER
ens WCERLevel:
Daily Report
Date: 4/20/2019
Report ft: 4
Page: 1 of 2
Well Header
Pap"bCancntalon N• Operator Subsidiary Initial Lame Code
HDL -3811583 ENI PETROLEUM ENI Petroleum Co. Ism DEVELOPMENT WELL
Rotary Table Elesman In, Ground Le 1red Fent Flange On RKe - Base Flange Do RKB- Tubing imsed(-I
53.87 32.805.12 1682 36.05 31.94
I I
Rigs
Rig Name ContractorWg Type Rig Num Rig sun Date Rig Release Date
RIG 15 DOYON tANORIG 0723 4fl02019
Daily Information
WeatM1er Temperature(F) Wind Days LTI jdaysl Days Rl(do,.) POB
Clear -94 SW 11 MPH 548.00 54fi.0o lo5.0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lastoaret
Commend
Safety Drills
Days Until Neat check
Type
9Occur
Last Date
Nest Date
(days)
Authodly VLad
1 4202019
412712019
7
BOP Pressure Test
1 4202019
V272019
7
Rig Inspection
4 4202019
412112019
1
Safety Meeting
4 420f20t9
42112019
1
TT H25 Drill
1 41172019
71162019
87
Casings seat
Oas.Type
OD (in)
ID (in)
Grade
Top(ftKB)
Bottom(ftKB)
TVO Ed. RKB)
Run Data
IN
13&8
12.42
L-80
0.0
3,469.5
2A50.8
"'mu"'
CASING
95/8
11.84
LBO
60
12,390.1
3,504 B
7/1412013
LINER
512
483
L-80
11.502.8
21,130.0
3,594.4
72512013
Last Cementing
Cementing Sun Date: 7/152013 Stni CASING. 12.390,1111 Comment:
NSA Top(ftKB)
I Top Meas Meth
Stan (final
Cam
1 r"I".
Log
12.390.0
SLB lest lines to 3000 psi. Rig pump 100 ober 105 ppg Mudl ® 5 bpm. NO psi, drop him plug and SLB max and
pump 230 bbls 12 5 pp9 DsepCrete cement @4B ppg, 550 psi, drop top plug and kick out wl 10 bole of water. Rig
[rpunm
displace wf 923 bbls of 94 ppg LSND mud ® M bpm, 2601820 psi. Bumped plug and pressure up to 1320 pat and
hold for 10 min. Floats held. CIP @ 1700 hn.
2
Job Information
Job Phase Planned Start Bate start Dun End Date Duration (days)
IPSO
WORKOVER 478r20190000 411720191000 1 900
Daily ummary Operations
24h Forecast
Rig up Baker end GBR. Pull tubing M1en9erwsM1 IalWing lornd. Steil d.mr,lefin,
24h Summary
Mines up BOPE and bad rims Set blanking plug for pressure tesfing. Test BOPE 25013000 psi, lest assumed by Jeff Jams of AOGCC. Rig down test equipment and hlow down lines. Stan rig up of Baker
,around for dftr-carnplbmn.
Operation at OT.Do
Pnp for Be Completion
Time Log
SWrt End Cum our
Time Time our lhfl IM) Phase Gen. Act. Plan Gen. Desw.
woo 02:00 200 200 W.O. C 5 P Continue to nipple up near and fieser line to BOP. Install flanged spool Or place of removed Conolis. Install accumulator hoses
to annular and upper rams.
0200 0630 450 6.50 W.O. C 5 P Install lower mms4 5- R Tensions. Install upper rams .5 K 5- variable rams. Replace door loatl hinge seals on bi ad
shear ram doors. Install blind shear mars. Leading 4 W tubing he pipe shed
06.30 1030 400 10.50 WG. C 5 P Rig up test BOPS Makeup lestjdnt W blanking plug. Cnthwe to load pipe shed with 4'6Nbing,
10.30 1830 8.00 1850 W O. C 12 P Test 13 518- annular with 4 V test joint win 250 psi bw and 3000 psi high for 5 minutes each. Test Assumetl by deft Jones of
AOGCC.
lshear ms. Replaced mors. dosed rams for 5 minu r with dosing pressure at
18:30 1930 1.00 1950.W.O C 12 TiRD5 Blind rams failed. Trouble shah leak on blindra
250D psi 3 times to relax minutes. Lower dosing pressure and relent MiMr ar rem test was good.
1930 22:00 250 2200 IN . C 12 P Test pit hdinumear solve.
Rig down led equipment Blow down surface lines.
22:00 ODAO 200 2400 W.O. L 1 P Remove BW. nub'm stack went down tubing. drugle9 Bakes id binar to rig floor. Prepare above W Imlalt in demck.
Gas Readings
Avg Background Gas (%1
Max Background Gas (%) Avg Connection Gas (•h)
Max Connection Gas (b)
Avg Drill Gas 1%)
Max Drill Gas (%) Avg Trip Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TankrAddibou Loss Type Das
Volume Our)
Tank
6570
Loss
0.0
Hole
1 044.0
Cumulative Mud Volumes
Active Volume (bbl) Hde VoIn. bbl) Additions (bullCum Additions (ver) Losses(hot) Cum Lnsea bb0
1,7010 1,044.0 00 O.D 0.0 1260
Daily Contacts
position
Contact Name
Company
True
Email
Office
Mobile
Erie mpresenWNe
Simone Belemmi
Em
Drilling Sup¢
addslt'ni ce
9 76850715
End repreaentat.
Mane Guarino
Eni
Drilling Supv.
Meno.Guadna@ni.com
Em cep er entalNe
Mike Grubb
End
Doling Si
siCdnllengl%henipebdeum.cam
907,685-0715
Ent representative
Alessandro Tulano
Eni
Fluid Supervisor
End represantalire
Weds Thomas
Em
Rig Clark
AKRIgClemmDd on15®eni.win
90760S0722
End representabof
Me&Publar
Eni
HSE
Ent representatNe
Cary Haughton
Em
HSE
Wiling Bolt.
Sam Dye
Doyon Grain,
Ii Superintendent
Tool Push
Justin Hays
Doyon Wiling
Tool Pusher
flgl5®doyaMrillengwm
Tool Push
Brief fkagle
Doran Wiling
Tool Push
Well Name: SP36-WS OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/20/2019
Report #: 4
Page: 2 of 2
Daily Contacts
Position Contact Name
Company
Tips
Email
Office
Mobile
Push Owens
Dnpn Ddlllne
HSE
cowens�tloyon.... ..ng.com
885-079fi
ToolPwh Send si erns
Doyon Dulling
HSE
Personnel Log (POB)
company
Sew. Type
Work H(hri
Stand-byH(N)
Client
Note
Haillhurian
ECD
12.50
0
Dulling
ASRC
Company Man
12.50
1
Drilling
ASRC
Cars
12.50
1
Dnllhg
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Be..
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Doling
Eni
Company Man
12.50
1
Dolling
Nodharn Defend Servir<a
Fuelar
12.50
1
SID Support
Velco(BHGE)
W@IIHead
12.50
1
Dulling
Eni
Fluids S,eerspor
12.50
1
Dulling
ACS
Eaviromenlal
12.50
2
SID Support
Beawn
WE
1250
2
SID Support
Doyon
Tool pusher,
12.50
2
Dnlling
Doyon
HSE
1250
2
Drilling
Ha111burNn
Mud Loggers
1250
2
Drilling
MI Swaco
Mud Engineer
12.50
2
Drilling
SLB
Cement
12.50
2
Drilling
GBRCssllg
Casing Senate
125p
3
Drilling
Competarb.
Logistic
12.50
4
SID Support
Better Cenmlift
Completions
12.50
5
Dnlling
MI Swace
Mud Plant1250
6
erring
P"
Security
1250
6
$IO Support
MI SWaen
WIF
12.50
8
SIDSuppod
EBS
Catering
1250
10
SID Support
Jesobs
Truck drlver l Crane operator
12.50
14
one,
Doyon
Rig Personnel
12.50
25
Dnghg_Total Drilling Personnel 74
BOP Stack 8 Components
Description
Madonna
Last Certificated Data Pressure Beting(Pai)
Type Make
Metier
ID Nom (int
PRange lissil T Last Cut Data
Slow Circulation Rates
Pump Number: Make:
Modal:
Start Date End Date
Liner Slee (in) Volume Per Stroke Overme (bblls&) Max Pressure (pi)
Cate I Depth(aHa)
Slow bpd
Stroke,(spm)
P(psp
EHI%) 0Flow(gpm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gal
Unit Size: 1
Note:
Data C. arm
Receivetl
ReNrnetl
Cum Conaumetl Cum Received Cum Returnee
Cum Dn Loc Note
42012019 1,1950
1,135.0
4.]]2.0
4,]72.0 00
0.0
Supply Item Description: Mud Plant Bnikns
Unit Labe:
Gel
Unit 5lze:
Note:
Date Conaumetl Received
Retumetl
Cum Conaumetl Cum Recelved Cum Returned
Cum On Loc Note
.019 420 4211
1660
168.0 0.0
00
Supply Item Description: Rlg Fuel
Unit LaIadj6q
us
Unit Size: 1
Note:
Data lUsak d
Returned
Cum Consumea Gum Receivetl Cum Returned
Cum On Loc Npte
Presumed
42012018 20.0 1,109.0
6,99fi.0
15,6950 0.0
8,699.0
Supply lNm Description: Rig water
Ulgt label:
bbl
Unit Size: 1
Note:
Data Consumea Receivetl
Returned
Cum consumed Our, Receivetl Gum Returnee
Cum On Loc Note
4@012019 780 0.0
146.0
2700 0.0
124.0
Supply lNm Desduptiot: WIF Rollers
Unit Label:
Gal
Unit Size:
Note:
Date Consumed Receivetl
Returned
UNm Corrsumed Cu. Received Cum Returned
CUm On Loc Note
4/2012019 198.0 1980
17--,C
920
792.0 OU
0.0
Supply Item Descdptlon: WIF In ectetl Diesel
UnRLabel:
Gal
Unit Size:
Note:
Date Conwmetl Receivetl
Returned
Cum Consumea Cum Recelved Cum Returned
Cum Oa Les,
IN.
4808019 8400 840U
2949.0
2.940.0 00
DO
Last Authority Visit
Date Tel loop. Nbr
Total I.N.C. number on!
tH
4802019
AOGOCommC
Jonas wilnessed ROPE Test 4120119
STOP Cards Submitted
company
R Rats
Com
Wynn Dnllirg
7
PJSM'S
Doyon Drilling Inc.
14
Sale Cams
Doyon Drimng Inc.
7
COW
Doyon Oohing Inc.
7
HRWS
Ml swacp
8
RIR's
Ml Swacc
6
HARCUSA
General Notes
Comment:
Well Name: OR
Wellbore Name: me: SP3 SP36-W-WS
Well Code: 27335
eninn' Job: WORKOVER
WCER Level:
Daily Report
Date: 412112019
Report #: 5
Page: 1 of 2
Well Header
PermiVtoneeulon N' Ocerator Subsldbry Initial LaM1ee Cmee
ADL -388583 ENI PETROLEUM ENI Petroleum Co Inc. DEVELOPMENT WELL
Rotary TeL4e Elevation ut, umum Lwal in) First-amge(ff) RKB-Base Flange IN) RKB-Tubing Spobi(.I
5367 32.805.12 16.82 3685 3194
Rigs
RIB Nema Contractor Rig Type Rig Num RIB Shirt Dad Rig Release Date
RIG 15 DOYON /ANO RIG 0729 9/102018
Daily Information
Weather Temperature (°F) wine Days LTI(dos) Days RI (days) POB
Cloudy 50 Ntlg 11 MPH 547.00 54]00 105.0
Safety Incidents - Near Miss
to Category Type Subtype Severity Cause Lost time]
Comment
Safety Drills
Days Until Next Check
Type
erOccur Last Data
Next Date
(days)
Authority Visit
1 4/202019 4272019
6
SOP Pressure Test
1 4/202019 42]2018
6
Rig Inspection
5 4121/2019 4222019
1
Safety Meeting
5 U212019 42412019
1
TT Kick While Topping Doll
242112019 4282019
7
TT H2S Dnp
1 411 7/1612019
86
Casings seat
Cas.Type
I Do (lot
IO (in)
I Grade
Top(ftKB)
I Bottom(hKBI
I TVD But(RKB)
Run UMe
CA IN
t3 WB
12.42
L-80
0.0
3.4685
2,450.8
71412013
CASING
9518
884
100
00
12,390.1
3.5046
7114/2013
LINER
512
4.63
LBO
11.502.8
21.1300
3,594A
7252013
Last Cementing
Cementing5tart Date: 71152013 String: CASING, 12.390.IRKB
Comment:
St, a Top RHM)
I Top Meas Meth
aft (NKe)
Cohn
1 9]230
Acoustic Log
12,3800
BLU teal lines to 3030 pal. Rig pump 100 bleb IDS ppg MudPush @ 5 rpm, 340 psi, drop Eton plug and SLB mix and
pump 230 bible 12.5 ppg DeepCrets cement @ 4S ppg. 550 psi, dmp top plug and kick out of 10 bbh of water gas
dlsdace w/ 923 bible of 9.4 ppg -SND mud ® 513 bpm. 2801820 psi. Bumped plug and pressure up to 1320 psi and
hold for 10 min. Fleets held. CIP ®17W hi
2
Job Information
Job Phase Planned Sure Date SON Data EM Dam P50 Duration (days)
WORKCAER 4/8201800:00 4/1]201810:00 0.00
Daily Summary Opera ons
24h Forecast
Pull out of hole laying down tubing. Lay down ESP assembly Make up new ESP assembly and run in hole on 126 pm tubing.
24h Summary
Rig up Baker and GBR Pull Hanger w/IWK. PUH 12.6 ppf tobin9 out of hole T/3.958% pumping 10 bph into annulus and tubing volume every 300'. Change out ESP electoral spool. Total bible of 8.8 ppg bumped
into .11 0. last 24 houn l- bible.
Operation at 07.00
UD ESP ASSY
Time Log
Start End Cum Dur
Time Time Durlim) the) Phase Our. Act. Plan Other. Descr.
00:00 04.00 4 OC 4 00 W O. - 1 P PJSM. Gather BHGE tools and RAJ ESP & Cap duel sheave to dmnck board Dal elephant mock. SIMOPS. install drip pan
drain hoses, install clam shell around riser. Adding 10 arms of 9.8 ppg brine per hour and pumping tubing volume every
04:00 0600 2.OD 6,00 Wo. L I P PJSM. R/U GBR 4S TBG handling equipment on rig ftomr.
06 OD 07:00 100 TDO W.O. L i P Gather BHGE tomisand RlUsem�aheave roaeflas 0 denkkboanf.
07:05 1000 3 DD lobo W 0. L 4 P PJSM. RIH and N1U landing joint on Tubing Hanger. Puil Haiger WMDK to unset Pull to the rig floor and disconnect ESP &
Cap lines as per SHOE and Vei rep. u0 Hanger.
10:00 16.30 6.50 16.50 W. P POOH 4.5" 12.6 p Tbg ,4t to ,365 fl and UD in shed removing IDg clamp- In rogeas. PU=100 k.
1630 1T30 1.00 17.50 W.O. L 9 P Rig up and pump tubing volume at 4 bpm 200 psi.
17:35 19:00 1.50 19.00 W O. L 4 P POOH 4.5" 12.6 ppf Tbg F/6.365' TI5.484. PU-95 k.
19:00 19.30 0.50 19.50 Wo L 20 P Replace hose an GBR tongs while restocking floor with Clamps and thread protMors.
19:30 21:30 1 2.00 2150 W 0. L 4 P 1 POO M1 Y6 ppf Tbg F15,494- TM, INS 8', PU=80 k.
2130 0000 2.50 24.00 W O. L 20 P Crange our NII elecumn spool In dismal house. Offload pipe from pipe shed Pump tubing volume of 60 SBLS at 4 SPM at
200 pet Trouble slwut spool house generator Heating issue. Adding 10 Obis of 9.8 ppg brine per hour and pumping tubing
volume every 3AD0.
Total dNa of 9.8 ppg pumped inlowdl line last 24 hours�40 ads.
Gas Readings
Avg Background Gas (%) Max Background Gas l%)
Avg Connection Gas(%)
Mas Correction Gas l%)
Avg Drill Gas (%) Max one use (%)
Avg Trip Gas (%I
Max Trip Use (%)
Daily Mud Volumes
TanIdAddttionlLoss
Type Des
Volume (bbl)
Tank
6490
Loss
3400
Hole
1,069.0
Cumulative Mud Volumes
Active volume (bbl) Hole Volume (bbl) Adi iOons (bbl) Cum Pregame Ibbs Losses (bbl) Cum Losses (bbl)
1,]18.0 1,089.0 0.0 0.0 340.0 466.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eel representative
Simone Afternoon
Em
Gigging Supv.
aido If ngCeni.cam
9W48SW15
Eni representative
Mike Grubb
Enl
Drilling Supv.
sidddlflng�anipeboleum.com
907485-0715
SO representative
Amami Tobago
Phi
Fluid Supervisor
Enl repmeentilive
Wed. Thomas
Eni
Rig Cledr
AKRigClerksDpyonl5@eni.com
9074054722
End representative
Mark Huber
Ed
HSE
Eni representative
Cory Houghton
Eni
FEE
Well Name: SP36-W5 OR
Wellbore Name: SP36-WS
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/2112019
Report #: 5
Page: 2 of 2
Daily Contacts
Poseion I Contact Name
Company
Tilde
Edell
office
Mobile
Milling did Bath Dye
Doyon Drilling
Fidd Bupe ntentlant
Tool Push Justin Hays
Doyon Drilling
Tool Posner
rigl5Qtloyondelling.wm
Tool Push Einer Faagle
Doyon Dulling
Tool Push
Tool Push Oliff Owens
Doyon Drilling
HSE
an s@doyendnlling.cpm
695-0796
Tool Push Scott Simmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Slant. Type
Work H Ihq
Standby H Ihr)
Count
Note
Hallibutlon
ECD
1250
0
Dtllling
ASRC
Company Man
12.50
1
Calling
ASRC
Clerk
12.50
1
D lir,
ASRC
SOA
12.50
1
SID Support
ASRC
Crans Advisor
1250
1
SID Support
Beason
Medic
1250
1
SID Support
Doyon
Field Supemlendent
12.50
1
DdNng
Em
Company Man
1250
1
Dain
Northam O'IKMid Servlcee
Fueler
12.50
1
SIDSupport
Vetoc(BHGE)
Welland
12.50
1
Drilling
Em
Fluids Supervisor
12.50
1
Drilling
ACS
Enwromental
12.50
2
SIDSupport
Season
HSE
12.50
2
SID Support
Detroit
Tad pushers
12.50
2
Dnlling
Doyon
HSE
12.50
2
DdIMg
HaDibudon
Mud Loggers
12.50
2
Drilling
MI Swaw
Mud Engineer
12.50
2
Dulling
SLB
Cement
12.50
2
Drilling
GBR Casing
Casing Sands.
12.50
3
Drilling
Competing.
Logistic
12.50
4
SID Supped
Baker Centliliff
Completion.
12.50
5
Drilling
MI Swaw
Mutl PWM
12.50
6
Drilling
Purcell
Security12
6
SID Support
Ml Swaw
WIF
S2.50
10
8
SID Supper!
ESS
Calmng
12.50
10
SID Suppml
Jambe,
Truck EdveN Cone operator
12.50
14
Miling
Doyon
Rig PersemeR
12.50
25
Dnlling_Total Dulling Personnel 74
BOP Stack 8 Components
Description
Start Dale
Last Cungsatlon Date Pressure Rating lips)
Type Make tootle/
IO Nor(in)
PRanpe(,al) Last Cert Date
Slow Circulation Rates
Pump Number: Make:
Mntlel:
Start Dow End Data
Liner Size lin)
Volume Per Stroke Override (bbllsik) Max Pressure (psi)
Dale I Depth loKB)
Slow Set
Stokes (spm)
P(PSN
Eff(%) 0Flow (gpm)
Daily Bulk
Supply Iqm Description: Equipment Fus!
Unit Labet
Gal
Unit Size: 1
Note:
Opti Consumetl Rec.had
Returned
Co. CansumM Cum Resolved
tum Returned
Cum On Loc Note
42112019 12650 1265.0
6,03].0
6,0370
00
0.0
Supply Ilam Dsseuption: Mrd Fund Begins
UM Labe,
Gal
Unit Size:
Note:
Dale Consumed ReceWetl
ReturnedGum
Consumetl Gum Received
Cum Returned
Cum Oa Loc Nate
42112019 420 42.0
210.0
210.0
0.0
0.0
Supply Item D ... rip6an: Rg Fuel
Unk Labee
gal us
Unit Size: 1
Note:
Data Consumetl ReceWetl
Relurnetl
Lum Lonsumetl Lum Recelvetl
Cum Returned
Cum On Loc Note
4/21/2019 1265.0 1,265.0
&2610
16,9600
00
8.699.0
Supply Reno Deserlptlon: Rig Water
UMltabeb
to
Unitsize: 1
Note:
Dale Consumetl lRessived
Relurnetl
Co. Consumed Cu. Receivetl
Com Relurnetl
Cum On Loc Note
421/2019 34.0 loo
t00D
2]0.0
00
900
Supply Item Description: WIFBoilee
Uet Label
Gal
Unit Size:
Note:
Dae Consumetl Received
Relurnetl
Co. Consumed Cum Recelvetl
Lum Relurnetl
Lum On Loc Note
4218019 1960 198.0
990.(1
990.0
00
0.0
Supply lam Description: WIF Injected
Desel
Una Label:
Gel
Unit Size:
Note:
Dae Consumetl
Recelvetl
Returlmtl Cum Consumed Cum Recelvetl
Cum Relurnetl
Cum On Roc Nola
421/2019 420.0
4200
3.360.0
3,360.0
0.0
0.0
Last AUMOnty Visit
Data TO loan. Nor
Total I.N.C. number Comment
4208019
I
AOGCC Jeff Jones witnessed ROPE
Test 4120119
STOP Cards Submitted
Company
kRpq
Com
Doyon Drilling
10
PJSMG
Doyon Driving Inc.
25
Safe Cards
Doyon Drilling Inc.
10
cow
Doyon Drilling Inc.
10
HRWS
Wigwam
8
per.
Ml Swaw
6
HARMJSA
General Notes
Comment.
Well Name:S OR
I� Wellbore Name: e: SP
SP36-W-WS
Well Code: 27335
Job: WORKOVER
gni WCERLevel:
Daily Report
Date: 412212019
Report #: 6
Page: 1 of 2
Well Header
Permttconcessien N' Operator ubslClary Initial La as Code
ADL -388583 ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation (MGfound Level ml First Plunge to, ftKB- ease Flange in) RKB-Tubing Spool(R)
53 S] 32,805.12 16.82 36.85 ]190
Rigs
Rte Name Comndor Rig Type Rig Num Rig Start DataRig Release Date
RIG 15 00YON LAND RIG 0]23 41102019
Daily Information
Weather Temperature(°F) Wind Days LTI(days) Days RI tdaysl Poe
Clear 86 INE @20 MPH Dol 548.00 105.0
Safety Incidents - Near Miss
Data category Type Subtype Severity cause Losttime7
Comment
Safety Drills
Days Until Next check
Type
9Occur
Last Date
Next Dale
(days)
Authority Visit
1
42012019 42
2019
5
BOP Pressure Test
1
42012019 42712019
5
Rg Robertson
6
4222019 412312019
1
Safely Meerng
6
4/222019 42312019
1
TT Kick While Tripping Drill
2
4212019 4MW2019
6
TT HOS 0011
1
4/172019 7/1612019
05
TT Spill Dail
1
412L2019 51612019
14
Casings seat
Cas.Type
OD (in)
ID (in)
Grade
Top(RK9)
Bottom(RKB)
I TVD BOL tRKBI
Run Date
CA ING
133/8
12.42
L -BO
00
6469.9
2450.8
]1412D13
CASING
95/6
8.84
LBO
0.0
12.39D.1
3,509.8
]11412013
LINER
512
483
L-80
11.502.8
21.130.0
3,594.0
728'2013
Last Cementing
Cementing Start Dale: 71152013 SWM: CASING. 12,390.1 tKB Comment:
Stg 4 Top tRKES
I Top Meas Meth Ban (MB)
Can
1 9.72 0
Acoustic Log 12,3BO.D
SLB We lines to 3000 psi. Rig pump 100 bbis 10.5 poll MudP4sh ® 5 bpm, 340 psi, drop btm plug and SLB mix and
s of ter. Rig
pump 230 bola 12.5 ppg DeepCrete cement @ 4.8 ppg, 550 psi, drop top plug and Wal, out wl 10 bibwa
displace w1923 bbls of 94 ppg LSND mud Q W bon. 2601820 N. Bumped plug am pressure up to 1320 psi ant
hold for 10 min. Floods held. CIP Q 1700 has
2
Job Information
Job Phase Planned Start DaW Stan DebtEnd Data P50 Dundee(days)
WORKOVER 4/10/20190090 4117201910:00 U.Oo
Dally Summary Operations
2411 Forecast
Complete MLEfrable splice and Suit @ Its. Intent cap and lest as per program. Continue to RIM with 0-12' 12.641410 TSA Hydtll 583 thread as per lolly -GBR tongue -tum correction using Ne Volant tool. Test
ESP cable every 1,000' ant monger 1000 psi. on cap fine. Cordage pumping 10 Sol of 9.8 plot brine into well.
20 Summary
POOH IMA68'. V83' -flush ESP assembly @ 303'. Terminate ESP cable/cap line to spooling unit and LAD ESP assembly. ROD umimnmengtlrein makes Irom sheaves in derrick. Change out saver sub an TD V4-
12' IF. MOB Baker Centreli8 and GBR equmment to Dips shed and its firer. MIU Volant toot to cap dwas PJSM- PN 7-W shed d and ESP assembly as par Baker CentralM W 05'. RJU ant string ESP cable and
though sheave in derrick and pop to splice. Pump 10 bbis car. of 9.0 poll hand W inch.
Note: Lose for last 24 hours = 250 bas,
Operation at 011
RIM W1ESP ASSY
Time Log
Start End Co. Dor
Time Time our (m) (m) Phase Opr. I Act. Plan Clear. Causer.
OO:OD OS'.00 5OD 500 W.O. L 4 P POOHw#h ESP assemby- 1-104-12"tbg 113,968'-11303'. Pump lO bbis.@r.of9.0 ppg arRre. monitor well Upwl=60k.
05M 05:30 0.50 5.50 WO L 19 P Circulatelflush 4-11T tubing and ESP assembly wily 10 bile. of UP ppg brine Pumping 85 Bpm ® 36 psi.
0530 0690 0.50 6w W.O. L 14 P Continue POOH I/303'- U83ESP assembly. Pump 10 firlscar. 09 ppg brine.
moo 10'.00 400 1090 W.O. L 5 P Terminate ESP cable/cap line pull back to spooling unit, UO ESP assembly as per Baker GentraliR reps to pipe shed.
Recovered and accounted fm all temps and components as per Baker can raped Wily. SIMOPS. Rumored red ant clamps, GRA
Wep, and air stops for the rig Seat,Cultures 10 bbis /hr. of 9.8 ppg brine in well.
1000 10:30 0.50 10.50 W . L 5 P PJSM- RID elapWnl track and 2- drain tom ESP cable sheaves in darner to run temperate.
1030 12:30 200 12.50 Wo, L 5 P Charge out saver sub on lop drive BY TT525 W 4-112 IF for Valantipd. Pump 10 Max Mr, of 9.8 ppg Was in WWI.
12'30 1530 300 15.50 W.O. K 1 P Mob Baker Ci ntrli0 tools antl antipment, ESP clamps, motor leads, Y. cep antl TEC line spools and components to rig Poor
for ESP assembly. RAJ GOR Volant muss on top drive and torque Sum compuladequymanl Lead pipe shed Win Baker
Centraiift 7-$/W shmud, pamplseala/moW a amMl . Conrnue whh l O bWs.lhr. of 9.B ppg brine in well.
15:30 2200'. 6.50 2200 W.O. K t P PJSM for mnnirlg ESP assembly- PIU 7 -518 -shroud and MN ESP pump/seal/mpor assembly, service same es per Baker
Centra ift reps. Insist MILE, W oap and V TEC Ilues V85'. Tested TEC line connection 115000 be Mr 5 minutes, witness ENI
rep. Check MILE to pump -good battle spike.
22:00 23:30 1.50 23. W W.O. K 1 P Splice rope W ESP cable and pull Mm igh sheave in demck, Rom spooling unit to rig floor.
2330 00 OD 0,50 2400 WO K 5 P Prep MILE end cable ends for mike, apiece with ENI elacbic)an b witness.
Nota: Lone Mr lest 24 M1wre= 250 able.
Gas Readings
Avg Background Gas t%)
Max Background Gas 1%)
Avg Connection Gas t%)
Moa Connection Gas t )
Avg Drill Gas (%)
Max Drill Gas (%)
Avg Trip Gas (%1
Mak Trip Gas (%1
Daily Mud Volumes
TanMAdii5on/Loss
Type
Des
Volume (bail
ank
861 a
Loss
250.0
Hole
1 066 0
Cumulative Mud Volumes
Active VOlume(bM) Hole Volume total) Addidons(bbp Cum Additions tab) Losses tLM) coLosses lbbl)
1,967.0 1005.0 00 00 250.0 7160
Daily Contacts
Position
Contact Name
Company Title Email Office Mobile
Eni representative
simom Sakmmi
I Eni Drilling Sup. laxem r".mcom 90]-685-0]15
Well Name: SP36-W5 OR
Wellbore Name: SP36-WS
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/22/2019
Report #: 6
Page: 2 of 2
Daily Contacts
Real".
Contact Name
Company
Title
Email
Office
Mobile
Ent repreaenhhve
Davld Smith
End
Drilling Supv.
Eel representative
Almsantlm Turbine
Eni
Fluid Supervisor
Eni repreeentdive
Were Thomas
Eni
Rig Clerk
AKRIgCkrksDadnlS@enLmm
907,685-0722
Eni representative
Mark Harper
EN
HSE
Enl repreeentated
Cory Houghton
Eni
HSE
Dolling Supl
Sam Dye
Doyon Wiling
Field Superintendent
Tool Push
Justin Hays
Doyon Drilling
Tool Pusher
dg15ittdoyandolifir,e m
Tod Push
El. Fkagle
Daps Drilling
Tool Push
Tool Push
CIiXOwens
Geyer Drilling
HSE
convensill000ndrifling cam
6854)796
Tod Push
Send Simmons
Doyon Coding
HSE
Personnel Log (P(
B)
Company
Sam. Type
Work H (hr)
stand-by H Ino
Count
Nate
TGMFU-rim
ECD
12.50
0
DNling
ASRC
Company Man
1250
1
During
ASRC
ChM
12.50
1
Oiling
ASRC
SOA
12.50
1
SID Support
ASRC
Cone Amliaor
12.50
1
SID Support
Beason
more
12.50
1
SID Support
Doyon
Flak Superintendent
12.50
1
Dolling
Eni
Company Man
12.50
1
Drilling
Northam Odlfoild Services
Fueler
12.50
1
SID Support
Vdm(BHGE)
Wettlead
12.50
1
Call"
Eni
Fluids Supervisor
12.50
1
Wiling
ACS
Envkmnenwi
12.50
2
SIDSuppori
Beacon
HSE
12.50
2
SID Support
Doyon
Taal pushers
12.50
2
Gaining
Doyon
NSE
12.50
2
Wriling
Hailiburlon
Mud Loggers
12.60
2
Grain,
MI Shrew
MW Ergineer,
12.50
2
Drilling
SLB
Cement
12.50
2
Dolling
GBR Casing
Casing Service
12.50
3
Galling
Competenhe
Logili c
12.50
4
SID Supi oa
Baker CeMNIdX
Compleaons
12.50
5
Dmlmg
MI Swam
Mud Plant
12.50
S
Drilling
Purcell
Security12.50
6
SID Support
Ml Swam
WIF
12.50
8
SIDSuppon
ESS
Catering
12.50
10
SID SuppOn
Jacobs
Tmck driver l Crane operator
12.50
14
Drilling
Doyon
Rig Personnel
12.50
25
Dnll'mg Total Drilling Personnel 74
BOP Stack 8 Components
Description
dart Doh
Last Codification Date Pressure Rating(psi)
Type
Make Model
ID Nom iii
P Range (psi) Last Cert Data
Slow Circulation Rates
Pump Number: Make:
Model:
sun Data End Vale
Line, $i.(in)
Volume
Per Stroke Override tbbllsh) Max Pressure (psi)
Data I Depth (XKBI
Slow Sptl
Stmkes(a m)
PlpsO
EXi%) 1 0Ft. igpm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label: Gal
Unit Size:1
Note:
Dafe Consumed Receivetl
Retufned Cum Oonsumetl Cum Recelvetl
Cum Returned
Co. On Loc
Nole
4122/2019 1,2120 1,212.0
].249.0
].2490
0.0
0.0
Supply It.. Description: Mud Plod edkrs
Unit label:
Gal
Unit Size:
Note:
one COnsumetl Receivetl
Returned
Gum Lomume0 Lum Recelvetl
Cum Relurnetl
Cum On Loc
Note
4P 019 430 42.0
2520
252.0
00
00
Supply Mem Description: Rig Fuel
Link Label:
gal us
Unit Size: 1
Note:
DahConsoared Received
Returned
Cum Consumed Cum Received
Lum Returned
Lum On Loc
Note
4=0192,0980 00
103590
16.950.0
00
6.601.0
Supply lhm Descriptlolr: Rig Water
Udt Label:
bbl
Unitsiae:1
Hopi:
Dew Consumed Received
Returned
[cam Consumed Cum Received
Cum Returned
cum On Lac
Note
41222019 28.0 80.0
208.0
350.0
00
142.0
Supply Item Description: WIF Boilers
UnItLabek
Gal
Unit St.
Note:
Dah Oonsumetl
Receivetl
Rewrnetl Cum Consumed Cum Received
Cum Returned
Cum On Lac
Now
.019 198.0
198.0
1.188.0
1,188.0
0.0
0.0
Supply item Description: WIF injected
Wpesd
Udt Lard:
Gal
Unit Sial, :
Now:
Gale Consumed Received
Reamed
Cum Consumed OUm Receivetl
Cum Returned
Cum On LOC
Note,
4122/2019 420.0 4200
3,]800
3,7800
0.0
0.0
Last Authority Visit
Dale Tot map. Nor
Tata) I.N C. number Comment
412012019
AOOGC JeX
Jones Witnessed ROPE Test 420119
STOP Cards Submitted
Company
IsRpw
Com
Doyon Gal,
16
PJ M'S
Doyen Wism, Inc.
18
Safe Cama
DoyonW INng Inc.
16
COW
Doyon Wtllkng Inc.
16
HRWS
Ml Swam
8
RIR's
Ml Swam
6
HARCIJSA
General Notes
Comment:
Well Name:S OR
Wellbore Name: e: SP
SP36-W-WS
Well Code: 27335
Job: WORKOVER
ani WCERLevel:
Daily Report
Date: 4/23/2019
Report #: 7
Page: 1 of 2
Well eader
PermlVConceaden N° pe bur Subaldiary Initial Lahas Code
ADL -388583 ON, PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rmary Table Elevation (N Ground Level (R) First Flange In) RKB -Base Flange (k) RKB-Tubing Spool (Rt
5367 32.805.12 16.82 36.85 31.94
Rigs
Rlg Name Contractor Rig Type Rig Num Rig Start Date Rig Release Date
RIG 15 DOVON I LAND RIG 0723 u1020t9
Daily Information
Weather Temperature (°F) Wind Ory' LTI (days) Day. RI (days) POB
1
Cloudy 150 NE @ 23 MPH 54900 549.00 108.0
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Lost fume?
Comment
Safety Drills
oays until Next check
Type
NOccur
Last Date
Next Date
(days)
Authority Visit
1
4/20/2019 4272019
4
BOP Pressure Test
1
4202019 427/2019
4
Rq Inspection
7
42112019 4242019
1
Salary Meeting
7
4/232019 424/2019
1
TT Kick While Tripping Drill
2
42112019 4282019
5
TT WE DriII
3
4232019 722/2019
90
TT Spill Drill
1
412212019 5R2o19
13
Casings seat
Gas. Type
Do (in)
10 (in)
Grace
Top (MB)
Bottom (RK3)
I TVD Bot RKB)
Run Data
CASING
133/8
12.42
LL80
0.0
3,489.5
23,504.8 ,450.6
7/412013
CASING
9518
884
:
0.0
12,390.1
i/1 N2013
LINER
512
483
L40
Mg028
21,130.0
3,594.4
7252013
Last Cementing
C .... tay Etartoate: 711512013 String: CASING. 12.990.1KK8 Comment:
atg If Top (What
Top Meas MeM Bpn (ttKB)
Com
1 9 ]23.0[meVlc
Lag 12,390.0
SLB teal Ilnes l0 3000 psi. Rg W cop 100Ib1s 10.5 ppg MUtlPush ®5 bpm, 340 psi, drop band plug and SLB mix and
pump 230 bms 12S ppg DeepCree cement Q 4.8 ppg, 550 poi, drop tap plug and kickout w/ 10 hula of water. Rig
displace .1923 DDH of 94 pplt LEND mud @ M3 bpm, 26W l psi. Bumped plug and pressure up to 1320 psi add
hold her 10 min. Floats held. CIP ®17M Inds,
2
Job Information
Job Pbase Planned Sort Date Suit Date End Dae PSO OurNb. fit".)
WORKOVER 4110201900:00 4/17201910:00 6.00
Daily Summary operations
26b Forecast
RIH with 4.1Z 12AN L-80 4-12' Hydnl Wedge 583 thread (/5,012- tR,390'. GBR torque -Wm connection with Vnlem tool. Test ESP cable every 1,000'and monitor 1000 an. on can line. Pump hag volume every
3,000and 10 bbls.lr. Change ESP spools around 7,400` and perform slim. Continue to 9,380' PIU halt hangerdanding joint, doss and spike ESP less.
241h Summary
Completed MLE/cap line aplica and rating. RIH will ESP assembly an 4-12' Hydn1 Wedge 563 tbg. GOR terms form conn tion 1/85'- 95,012' -teat ESP cablelmomtar cap line every 1.000'. Pump hag volume
every 3.00)' will 9.8 ppg brine, also pump 10 bbls.mr. of 9.8 ppg brine to well.
Note: Lose for last 24 house = 283 bbls.
Operation at 07.00
RIH W/ESP ASSY
Time Log
Star[
End
Cum our
Time
Time
our em)
Mr)
phase
Opt.
Act.
Man
Oper. Dinner.
0000
03:00
300
3W
W.O.
K
5
P
Completed MILE antl ESP cable spllm an ng floor as per Baker Complaft Perform elecbiml tat and recorded data
spmling unit- all good, all witness by ENI elececian.
0300
05.30
2 50
5 50
W.O.
K
5
P
Pull cop line lrpugM1 sM1eave in tlarnck and optica %" ta JIB`. Perform pressure teal- low 250 psi, 1000 psi: and 2000 poi: all
recorded with Data Logger on 1 second intervals for ♦10.Mutes -all goad, on leaks. Bleed pressure to 1000 psi. and
stabilized for monitoring while RIH, Change Dae Logger to 2 minute Intervals.
0530
17.30
1200.
17.50
W.O.
K
4
P
RIHwhh ESP ..piston assembly PlU 4-12112.M/L.80 I Hind) Wetlge 563 hag.IRS'-9$028'. With GBRVolanitool and
partiatum commum a. Perform se micel and data est ch ESP cable every 1,000' and moetor regularly line @ 1000 psi.
IslaWd me coupling case clamps on every joint while RIH. Up vol=Hak1 Dn M= 94k. Pump via 9b tank 10 bbls.lhr. of
9.8 ppg brine.
1730
18.30
1.00
18.50
W.O.
P
Test ESP case and check cop line pressure. Ciutale ibg volume wild final pump rete 56 gpnd Lly 170 put, Baker Cenhatift
Invited a M gpm.
lav)
00'.00
5 50
2400
W.,
K
4
P
Continue RM with ESP cempietlon reprinter, PIU 4-121 126# I L -80I Hydro Wedge 563 Big. (13,028'- 95.012. GBR torque
name mrsu cbon with Volas tool. Baker Cenbali8 perform ESP case electrical rest and recoil data every 1.000'. Monflor
W" Data Logger and maintain cap line ®1000 poi. Initial ESP cable clamps on ever connection. Up can=1031, / Do wt=
90k. Cbcuete lig volume esry 3,000', nerd @ N- 6,000'. SIMOPS' Spot ESP a vial by ung to prep fm up.mang Mange -oro
of reels
Note: Lose for last 24 flours m 283 bbls.
Gas Readings
Avg Background Gas I%)
Max Background Gas (%)
Avg Connection Gas (%)
Max Connection Ga I%)
Avg Drill Gas (%)
Mas Drill Gas (%)
Avg This Gas rh)
Max Trip Gat (%)
Daily Mud Volumes
TanWAdditeNLoas
Type
Da
Volume (pull
Tank
877.0
Loss
283.0
Hotta
1.01{4.0
Cumulative Mud Volumes
Active Volume (bbl) Note Volume (bbl) Additions (bbl)Gum Additions (bbl) Lona (bat Cum Losses (bbU
1,941.0 1064.0 00 00 283.0 999.0
Daily Contacts
Position
Contac[Name
Company
Title
Broad
Office Mobile
En repreaentagve
Elmem Belemml
Eni
Drilling Supv.
sedmlingssenLcom
9........
75 8 5071 5
Eni reposen al
Oavitl Smith
Ent
Drilling Supv.
Eni npraentative
Mendenhall Tureen
Em
Fluid Supervisor
Well Name: SP36-W5 OR
Wellbore Name: SP36-WS
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/23/2019
Report #: 7
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Emall
Office
Mobile
Edi represeMelNe
Wade Thomas
End
Rig CleM
AKRigCler"Doynnl5®eni.com
907-6850722
Eni repmsentelrve
Mark Hurler
Era
HSE
Enl represedtilNe
Cory Houghton
Eni
HSE
Drilling Supt.
Sam Dye
Doyon Ddkng
Field Superintendent
Tool Push
Justin Heys
Doyon Dealing
Taal Pusher
6g15Qdoyonddlllrg cpm
Tool Push
Elim Fle.N.
Doyon During
Ted Push
Tool Push
CIO Owen.
Doyon 0,011ng
HSE
cosenceflidirehoinfling.ohn
0050796
Tool Push
Scott Simmons
Doyon Detling
HSE
Personnel Log (POB)
Company
Sam. Type
We* H (hr)
Sandi H Hit)
COUM
Note
Hellburbn
ECD
12.50
0
OrMing
ASRC
Company Man
12.50
1
DriOing
ASRC
Clerk
12.50
1
Onlr g
ASRC
SOA
12.50
1
SIDSupport
ASRC
Came Adviser
12.60
1
SIDSUpport
Beacon
Medic
12.50
1
SIDSU,.d
Doyon
Field Superintendent
1250
1
Drilling
EN
Company Man
12.50
1
DNlling
Norham Oilblld Serves.
Feeler
12.50
1
SID Support
Vale. eHGE)
Wellhead
12.50
1
Drilling
Eni
Fmgs Supervisor
12.50
1
Dtllling
ACS
Envsomenlai
12.50
2
SID Support
Seaton
HSE
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
grind,
Doyon
HSE
12.50
2
Entine
Halliburton
Mud Loggers
12.50
2
Dintung
MI Saco
Mud Engineer
12.50
2
DtlOmg
SLB
Camel
12.07
2
Crime
Competen8e
Legrilic
12.50
4
SIDSupport
GER Casing
Casing Service
12.60
4
Drilling
MI 607..
Mud Plant
12.50
6
Drilling
Permit
security
12.50
6
SIDSUPport
Baker Carmliff
Completions12.50
6
Drilling
MI Sup.
WIF
12.50
0
SID Support
ESS
Candng
12.50
11
SID Support
Jacobs
Trucktldver/Crsneoyerater
12.50
14
Entire
Doyon
Wg Personnel
12.50
25
DdlingJotal Drilling Personnel 74
BOP Stack 8 Components
Description
Shrt Doh Last Certification Date Pressure Rating (psi)
Type Make
Model
lD Nunn (In)
PRange (psi) Last Cert Data
Slow Circulation Rates
Pump Number: Make:
Abdel:
Start Data End Date
Liner Sin (in)
Volume Per Stoke McMtle(bbill Max Pressure (psi)
Data Depth (NICE)
Slow Spot
Strokes issued I P Haiti)
Eff (%) D Flow (gam)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label: Gal
Unit Sue: 1 Note:
new Consumed
Returned Cum Consumed Cum Resident On Loc
m
Note
151
42312019 0 151]0
8,]60 0.0 0.0
Supply Item Description: Mud Plant Boilers
Unit Label:
Gal
Unit Size: Note:
Data Consumed Receivetl
Returned
Cum Consumetl Cum Received Cum Returned Cum On Lo.
ride
412&2019 42 0 42.0
294.0
294.0 0.0 I.0
Supply Item Description: Rig Fuel
owl Lsted:
gal us
Unit Bice: 1 Nate:
DohConsumetl Receivetl
Rehrated Co. Consumed Cum Receivetl Cum psi umetl Cum On Loc
Note
4232019 2,325.0 3,086.0
12.6840
20.046.0 00 7,362➢
Supply learn Description: Rig Water
Udt Label:
bbl
Unit Size:1 Not:
Date Consumetl Receivetl
Retumetl
Cum Consumed Cum Isnolved Cum Returned Cum On Lac
Note
42312019 10].0 0.0
3150
350.0 De 350
Supply team Description: WIF also.
Udt Label:
Gal
Unit Size: Note:
Doh Consumetl
Received
Rehrneot
Co. Consumetl Cum Received! Cum Returned Cum On Loc
Nota
4232018 198.0
1980
1,38fi.0
1,386.0 be 0.0
Supply Item Description: WIF Injected
Dina l
Unit Label:
Gal
Unit Size: Nate:
Date Consumed Receivetl
Returned
C
Cum Consumed Cum Received Cum Returned Cum On Loc
Note
4232019 Do 0.0
3,]800
3,]80.0 0.0
Last Authority Visit
Date Td ins, the,
Total LN.C. number Comment
42012019
AOGCC Jeff
Janes witnessed BOPE Test 4120119
STOP Cards Submitted
Co.""
p Rpts
Com
Doyon Drilling
3
PJSM'S
Doyon Drilling Inc.
3
COW
Doycd Drilling Inc.
3
HRWS
Doyon Drilling Inc.
7
Safe Cards
Ml Sane
5
HARCIJSA
MI Swaco
8
RIR'.
General Notes
Cmnmenr.
Well Name: SPR
Wellbore Name:: SP36- SP36-WS
Well Code: 27335
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 412 412 01 9
Report k: 6
Page: 1 of 2
Well Header
Farm Correlation N" Operator
Subsidiary Initial Lanes Code
AOL -388503 ENIPETROLEUM
ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Houston in) Ground Level(N)
First Flange (it) RKB - Base Flange IK) RKB Tubing Spool(R)
53 61 13.09
16.02 36.85 31.94
Rigs
Rig Neme Contractor
RIg Type RI9 Num Rig Brad Data Rig Release Date
RIG 15 DOYON
tAND RIG m23 4/102018
Daily Information
WeatherTemProtons PF)
Wind Days LTl(daye) Days Rl(days) FOR
Clear 8.6
NE 22 MPH ifivi 55000 1060
Safety Incidents - Near Miss
Date category Type
Subtype Severity Cause Losttimei
Comment
Safety Drills
Days Until Next Check
T pe
'Occur
Last Date
Next Date
(days)
Authority Viso
1
4120/2019
42712019
3
BOP Pressure Test
1
412012019
42712019
3
Fire unit
1
412442019
5/8/2018
14
Rig lnspediat
S
42412019
42512019
1
Safety Managing
8
42b2019
4252019
1
TT Kick While Tripping Ddg
24212019
420/2019
4
TT 142S Drill
3
42312019
]/22/2019
89
TT Spill will
1
4222019
5/6/2019
12
Casings seat
Cas. Type
Do (in)
ID (in)
Grade
Top (ftKB)
Bottom itlKB)
TVD Sot.(hKB)
Run Data
CASING
13 1,8
12A2
L -BO
0.0
3469.5
24508
]l4/2013
CASING
95R
B.Bd
1,80
0.0
12,390.1
3,504.8
711412017
LINER
512
4.83
L-80
11,5028
21,130.0
3,5944
7252013
Last Cementing
Cementing Start Date: 7/1WO13 String: CASING. 12,3gc1ftKB
Comment:
Sig 9
Top (KKB)
I Top Meas Mem
Ban DtKB)
Cpm
1
9,723 D
Acbu.9r Lag
12,390.0
SLB teal Ines ad 3000 Psi, Rig Pump 100 been 10.5 ppg Mudi @ 5 bpm, 340 psi. drop burn plug and SLS mix and
pump 230 bible 12.5 ppg Dissociates cement @ 4.0 ppg. 550 psi, drop lop plug and kick but wl 10 blue of water. Rig
displace ad 923 bible of 9.4 ppg LSND mud ® 513 bpm, 260/ 820 psi. Bumped plug and pressure up M 1320 psi antl
hdtl for 10 min. Floats held CIP 170 him
2
Job Information
Jab Phase Planned Start Date
Start Data End Dole Pill DuraOon (days)
WORKOVER 4110201900:00
411]201910:00 0.00
Daily Summary Operations
20 Forecast
Finish penetrator pigtail spkce and dress 169 hanger with splice Y.' capillary
-line, perform lead on each. Land mg hanger and perform electrical lest. Test harper body V5000 psi. Pull landing joint and Install BPV-
months. WD BOP and WU use. GE Veko perform passport last.
2" Summary
RUN ESP completion an 4-12' mg 12.60 / L -80I Hydril Wedge 563 thread (/5,012'- 0,0451 Change ESP spools and perform ESP cable slice I test GBR mmue-tum connection with Voted tool. Test ESP cable
every 1.000and Data Lagger monitor capillary line Ig 1000 psi. Pump tbg volume Q 6,000' and 10lebJhr. Generale 0.390' and P4U mg han9edianding joint, GE Vetcn oriented and NO HellibuMn Fast Swivel.
Baker CerdralM ESP penetrator pigtail spike with ENI electrician witness.
Note: Lose for last 24 hours = 363 tads.
Operal en at 07.00
Wp SOME
Time Log
Stare
End
Com our
Time
Time
Dur (m)
err)
Phase
Opr.
I Act
Plan
Doer. Descr.
00:00
02'30
250
230
W.O.
K
4
P
RIH with ESP completion P/U 4-12112. BY 4 L-80 / Ryddl Wedge 563 ibg. f6i65.029'. GBR tbryue turns conte Nsm
with Volad tool. Baker Centralifl perform ESP cable electrical fest and record data every 1,000'. Monitor Data Logger on cap
line @ 1000 psi. Install ESP cable clamps on every contemnor. On w1,= 821. Pump fit dunfln. of SS ppg brine.
0230
0330
1.00
3.50
W.O
K
19
P
Test ESP cable all check cap line uppeamen Circulate Ott volume with fmau pump We 75 gpm ® 840 pal.
0330
0630
3.00
6.50
W 0
K
4
P
RIH with ESP cample0on PIU 4-12-112.60 / L-00 / Hydnl Waste 563 tbg. WT- W.045. GBR tofqueAum wnmmibm.
Preform electoral and tlda test on ESP cable and monitor capillary line @ IM psi. Installed cable clamps on every joint On
a4= 82k Trip tank atld 10 bbis.dr, of 9.8 ppg brine.
05:30
11:00
450
11.00
W.0
K
5
P
Change out reek In ESP spooling unit per Baker Cardinal, Spike ESP cable to reel In spooling Mul and test ekceical and
record down hole data points, wMeas by ENI blecMtlan. SIMOPS: Service top drive, pipe shad and mud pump maintenance,
C/O Volanf battery pack as per GBR.
1100
18:00
7.00
18.00
W.0
K
4
P
Continue RIh with ESP compkfion PN Fll /t LLS; / LACI NOW Wedge 583 Re. V7.045' -V9,390'. GBR toque him
connection. Baker Centralia perform ESP cable electrical test and recall data every 1,000'. Monitor capiiery lith with Date
Logger @ 1000 psi. Install ESP cable clamps on ever comlec0ot. Do cal.= 721,.
1800
19.00
To
1900.
W.0
K
5
P
FVD GBR bail exlamamps and Volant and install 4.11 mg elevators - MOB ting hanger and Hagiibudon FAST -Swivel to re
floor.
1900'.
20 OD
1.00
2000.
W .
K
5
P
WU Rover Halliburton FASTSwiml. Wit lending joint and MN b tbg hanger. GE Vetrn'dented and MN to spec: final gap
0.462 mm
TO -0i
00,001-400
24.00
W.O.
K
5
P
Baker Centrallh making final penetrator Pgtag assembly splicefor" hanger. witness by ENIetendan. Prearced Post 4
on caplllery Ilne with 1000 pan record one second Interval. for 10 mins.
Note: Lose for lest 24 hours =363 Max.
Gas Readings
Avg Background Gas (%) Max Background Gas (%I
Avg Connection Gas I%)
Mak Connection Gas (%)
Avg Drill Gas (vd Max pill Gas (%I
Avg Trip Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TanWAtlamonlLoss
Type
Des
Volume Rf
ark
2 0
Loss
363.0
Hole
1,045.0
Cumulative Mud Volumes
Acfive Volume (bellHole Volume (bbl) Additions (blah Cum Additions (bbl) Losses (bbl) Cum Losses (bbh
1,248.0 10450 0.0
0.0 363.0 1,302.0
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/242019
Report #: 6
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Email
Chet.
Mobile
EM representative
Simone Sell
Eni
Drilling So,
sidddlling@eni.com
8 0 741850715
Enirepnrmt.11N.
Could Smith
Ent
Duling Supe.
Eniu numali
Watle Thames
EN
RIB Clerk
AKRIgCkrIbDU mnl5@sni.cam
950605-0722
Eel repmeardetive
Mak Hublar
Epi
HSE
Eng zepoaerlative
Cory Houghton
Eni
HSE
Drilling Supt
Sam Dye
Doyon Drilling
Heid Su mark. fart
Tool Push
Justin Hap
Doyon Dr01hp
Tool Pusher
rgl5@d Wnddiling.com
Tool Push
Einer Fmegm
Doyon DMiing
Tool Push
Tool Push
CIICvoom
Dayan DnRng
HSE
cowens@dopnddlling.com
885-0796
Tod Push
Dev. Sena
Doyon Drilling
HSE
dsena@dopondrilling.com
605-0796
Personnel Log (POB)
Company
Sam. Type
Work H(hr)
Stand-byH an
Court
Note
Hell orlon
1250
IIinD
Eni
Field. Supervisor
12.50
0
Drilling
ASRC
Company We
12.50
1
Drilling
ASRC
Clek
12.50
1
Dnlling
ASRC
SOA
12.50
1
SID Support
ASRC
Cone Adviser
12.50
1
SID Support
Beacon
Medic
1250
1
SID Support
Doyon
FMtl Superintendent
12.50
1
Drilling
Eli
Company Man
12.50
1
Dulling
Noribem Oipelld Servtes
Poster
12.50
1
SID Support
SLB
Cement
12.50
1
ranging
Veto(BHGE)
W.IlHead
12.50
1
Drilling
ACS
Envimmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tod pushers
12.50
2
Running
Doyon
NSE
12.50
2
During
Halliburton
Mud Logger:
125D
2
Drilling
MI Ssu co
Mud Engineer
12.50
2
Drilling
COcquouta
Logistt
12.50
4
SID Supood
GBR Casing
Corning Sarviw
12.50
4
piiMg
Mi Swaw
Mud Plant
1250
6
Drilling
Purcell
security
12.50
6
SID Support
Baker Cei
Completions
12.50
6
Dulling
Ml $warn
WIF
12.50
8
SID Support
ESS
Catering
12.50
11
SID Supporl
Jacobs
Truck driver /Cane operator
12.50
14
Drilling
Doyen
Rip Personnel
12
1
25
DnIIIn9Jotal Drilling Personnel 74
BOP Stack R Components
Description
8Yd Wte
Last C.dit .tion Data Pressure Rating has!)
Type Make Model
ID Nom (in)
PRange (psi) Last Ced Dole
Slow Circulation Rates
Pump Number: Make:
Modelo
start Date End Data
Liner Size (in)
Volume Per Stroke overdue bbllak) Mas Pleasure (,a!)
Date Depth(WEI)
Slow Spit
Strokec(spm)
P(par)
Ee(%) OFlow (gpml
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gal
Unit Size: 1
Note:
Doh lConsumed
I Received
Rate ... d
Cum Consumetl Cum Received
Lum
Returned CUm On Lon
Note
424/2018 1,048.0
1048.0
9,814.0
9.814.0
CU
0.0
Supply Item Dosc - Mutl PleM
eolmM
Unit Label:
Gal
Unit Size:
Note:
Date Consumetl Received
N!
Returnetl Cum Consumed Lu -.Ross -
Cum Returned Com On Loc
Note
,ug
4IZ19 42.0 420
336.D
60
0.0
Supply Rem Description: Rig Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Date Consumetl Readved
Remrrad
Cum Consumed Cum Received
Cum Returned Cum Oa Loc
Note
42412019 22990 0.0
14,983.0
20,046.0
0.0
5.063.0
Supply Item Description: Rig Water
UnRLebel:
bbl
Unit Size:1
Note:
Rafe ConsumedRaceivetl
Returned
Cum Consumed Oum Received
Cum
Returned Cum On Lou
Note
4242019 210 0.0
3360
350,0
0.0
14.0
Supply Item Description: WIF Boilers
Unit Label:
Gat
Unit Size:
Note:
C on.
Date CsumedIn
Received
RNurned
Cum Consumetl Cum R.ceived
Lum
Returned Cum On Loc
Note
4242018
1980
t504.0
1,584.0
0.0
0.0
Suoply Ram Description: WIFladed
Dleld
Unit Labol:
Gal
Unit Size:
No.
DantConsumetl
Received
Returned
Lum Consumed Cum Received
Cum Returned Cum On Loc
Note
42412019 4200
4200
4,200.0
4,200.0
0.0
0.0
Last Authority Visit
Date Tot hop. Nor Total I.N.C. number Comment
4202o18
gOGCC JeR
Jones wban ed ROPE Test
420/18
STOP Cards Submitted
Company
0 Ross
Cam
Wynn Dinfifing
11
PJSM
Doyon Drum, Inc.
42
Sale Cards
Doyon Drilling into
11
COW
Doyon Drilling into
11
HRWS
Ml Sis.
8
RIR's
Ml Swaco
7
HARCOSA
General Notes
comment:
Well Name:5 OR
Wellbore Name: e: SP
SP36-W-W5
Well Code: 27335
enie' Job: WORKOVER
WCERLevel:
Daily Report
Date: 4/25/2019
Report #: 9
Page: 1 of 3
Well Header
PermitlConcession N°
Operator
Subaldiary Initial Lames Ootle
AOL -388583
ENI PETROLEUM
ENI Petroleum Go. Inc. DEVELOPMENT WELL
Rotary Table Elevation jr, Ground Level DoFirst
Flange(,) RKD - Base Flange HO KKB Tubing Spool(a)
5367 13.119
16.82 36.85 31.94
Rigs
RigName
Conbacfm
Rig Type Rig Num RIg SMrt De@ Rig Release Date
RIG 15
DOYON
LAND RIG 0]23 4/tO2019
Daily Information
Weather
Wina Days LTI(days) Days IS POB
Overcast
r14..
14.0
EQIO MPH 551.00 55100 980
Safety Incidents - Near Miss
Data Category
Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Next Check
Type
0Occur
Last Date
Next Date
(days)
Authority Mak
1
42012019
412712019
2
BOP Pressure Test
1
42012019
4127/2019
2
Fire drill
1
4/2472019
W12019
13
Rig lnspsctlon
9
412WO19
42612019
1
Safety Moetin9
9
41252019
42612019
1
TT Kick While Topping Drill
341252019
!r22019
7
TT H2S 0.11
3
42312019
7222019
88
TT Spill Doll
2
4252019
5192019
14
Casings seat
Cas.Type
GO (in)
to (in)
Grade
Top RKB)
I am". (me)
I TVD But (faKB)
Run Data
O aimri
133/8
12A2
L-60
0.0
3.469.5
2,450.8
]142013
CASING
9518
8.84
L80
00
12.390.1
3.509.8
]1142013
LINER
5 112
4.83
L-80
11.5028
21,130.0
3,594.4
72672013
Last Cementing
Corning., Start Dale: 771512013 String: CASING. 12.390.1gKB Comment:
Soo
Top IaKB)
Top Meas Mem
I Ban(RKB)
I Co.
t
9.]23 0
ACoudk Lag
12.390.0
SLB last lines to 3000 Par. Rig pump 10 bbN 10.5 ppg Madftsh @ 5 bpm, NO psi, drop ban plug and SLB mix and
pump 230 bola 12.5 ppg Dissociate cement @ 4.8 ppg, 550 psi, drop top plug and kick out wl 10 bola of water. Rig
displace w/ 923 bale of 94 pp, LEND mud @ W bpm, 26M 820 psi. Bumped plug and pressure up to 1320 psi and
I
hod by 10 min. Firsts Mid CIP @ 1700 bra.
2
Job Information
Job Phase Planned Start Date
Start Data End Data PSD Duration (days)
WORKONER 4110201900.00
4/17201910:00 OOO
Daily Summary Operations
24h Forecast
SP35AV5 workover complete. Rig mow horn SP36-W5 or SP12-SE3.
24h Summary
Finish penetrator pigtail splice and area mg harper with splice Y°' capillary line, peoora test an each. Land thg hanger and sclec in lock down pins, perform electrical lest. Teat hangar body V5000 Psr. Pull
landag joint and install BW-montlw. WD BOP and WU tree_ GE Ve" perform passpod teal.
We Lose for last 36 he.. = 363 bbl i.
Operation at 07.00
Rig all operations to SP12SE3
Time Log
Stare End Cu. Dur
Time Time Car(hn I @q Phase
Orr. Act. Plan Oper. actor.
00.00 0100 1.00 1.00 W.O.
K 5
P Baker Centralift finishedfrol penetrator pigtail spinaefor tbg hanger and conduct etmoreal test, wiliness by ENI hauctocian.
Add 10 bblsJhr.
0100 0200 100 200 W .
K 5
P Space oW arm hicall 1W capol line through themg harperper. GEVeer. test hanger capillary void t. S"Ing far 10
mins. Wrap %' hose mass mg and spike to 316'. Add 10 bb6 mr.
02:00 0330 1.50 350 V0_
K 12
P Pedonn capillary integray tart. recorded with Data Logger on one second intervals for IO - mina. @250,i and 1000 poi.
Increasing pressure to burst disk @ 4033 psi, and continue pumping Hof 5 minutes to confian Inledlon ICP ® 19M psi. antl
FOP ® 19M parshuNa and member for 10 manages pressure slebiilaed @ 1876 psi. Pwg in umbikmrd to Perri and
perform electrical lest - good
03.30 05:00 150 500 WO.
C 5
P Land ESP complegon lntowell head (Upwt=14M.On all 75k)- lorJ: tlown pine and pmmmMdcomplete ESP
ager bnding - gad, w9mas by ENI rep. Teat hanger body void V5000 pat far 10 minutes per GE Vatco, winners by COL.
dollar.
5,00 06:30 1.50 5M Wo
C 5
P and UD belling joint and installed SW Into Ibg hanger - shelter or 30 minutes. WU fill -up lane to Annulus B to maintain
10 blas As. white NT. SIMOPS: Clear non-essential equipment and clean ng floor.
06:30 12CD 5 s0 MOO W O.
C 5
P7_ NAD BOP- remove IMckell nipple - remove accumulator, cboka and kill lines-chokepkill NCR antl manual ver es -PIUand
rack back BOP stack - Pull HP dset rack back tin cellae SIMCPS: Prep to move dg
1200 137 100 13.M W.O.
C 5
P NVU Ins - Pmp tog hanger and run capillary through bee par Viden, rep. Set and torque ray -lock to spec.
13:00 1430 1.50 14.50 W 0.
C 5
P Test hanger void and neck seal V5000 par tar 10 mases per GE Vetco. witness by ENI company rep. Pull BPV and Install
TWO RU to test.
1430 17:m 250 1700 WO.
C 12
P Attempt to areal test, Iumcater out TWO and repbam with new TWO. SIMOPS'. ROD and move accumulator, WD lines m#3
mud pump, dean pile, and cock washer for dg move
17:00 2300 600 23.00 Wo
C 12
P 1SWournpasspod teal an tonal Par Gil Vefti2 30 psi, grease and firmetronolives and SSV.Go last. SIM PS: Remove
.it ..an. and #3 mud pump, pus seMce loop hmn tap done and denkk Prep b odd rg floor.
2300 00:00 100 24.00 NTO
C 5
P Rempw TWO w wbr.bdcat,To same and was has valve- secure well Workover completed
Note. Lme for last 24 hours =208 ods.
Note: ProducMn -bleed down all monitor EP125E3-tbg? 244 psi. l Am.dus 8=150 Psi. /Annulus A= 268 psi.
Gas Readings
Avg Background Gas I%)
Max Background Gas I%)
Avg Connection Gas I%)
Max Connection Gas CA)
Avg Drill Gas (°hl
Max oral Ga (%I
Avg Trip Ga. I%1
Max Trip Gas I%)
Daily Mud Volumes
Tonl0tltlm
tivall.3
Type
Des
V.I.(bbg
Tank
0
Loss
208p
Hole
1,045.0
Well Name: SP36-WS OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/25/2019
Report #: 9
Page: 2 of 3
Cumulative Mud Volumes
Active yet...(bbq HONv0lmna(bbll AddlOans(bb0
Cum
Additions(6b0 Losses (bbl) Cum LOases(bM)
1.0450 1.Ws.0
0.0
0.0
2080
1.570.0
Daily Contacts
Position
Conssct Name
Company
Title
Email
oelce
Middle
Ent repremmeave
Simone 8efirrom
Ent
Unhand; Sup¢
eadnlliigleni. m
90]-685-0]15
Ent representative
grace Simonson
Ent
Drilling Supv.
audddlling@,mcom
90],68&0)15
Ens repreaentatNe
David Smith
Ent
Drahng Supv.
Ent representative
Wed. Thomas
Ent
Rig Clerk
AKRsgClerksDdyon l5®eni.com
907465-0722
Enl rep .... nations
Me& Hubler
Ent
HSE
Ent haresenhlbe
Pet Mem
Ent
HSE
Will, Supt. Sam
Dye
Dayton
Oak,
Reid Superintendent
Taal Push
Rye. Pankrah
Doyon
Drilling
Taal Pusher
ngl5iltdoyonddlling,win
Tool Push Einer
Handle
Doyon
DHIUng
Toal Push
Tod Push Carlosm
Doyon
DMBng
HSE
covens@dayorionOing.com
885-0798
Tool Push
Dave Sena
Doyon
Drilling
715E
dsenatiltdoymmnlling.mm
885-0796
Personnel Log
B)
Company
Sere. Type
Work H(hr
Stand-by H(hr)
Count
NMB
Haliburon
ECD
1250
0
Calling
SLB
Cement
1250
0
Drilling
Ent
Rad. Supervisor
12.50
0
Drilling
GBR Casing
Cash, serves
12.50
0
Drilling
ASRC
Company Man
12.50
1
Drilling
ASRC
Clan:
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beason
Modic
12.50
1
SID Support
Doyon
Haiti Superintended
12.50
1
Drilling
Ent
company Man
12.50
1
Drilling
NeMer. Oilleild Services
Favor
12.50
1
SID Supyor
Vemot(BHGE)
WsIIHead
12.50
1
Drilling
ACS
Extramarital
12.50
2
SID Support
Beacon
WE
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
Drilling
Dayan
HSE
12.50
2
Drilling
Helliburzat
Mud Loggers
12.50
2
Drilling
Ml shared
Mud Engineer
12.50
2
Drilling
CompMened
Legible
12.50
4
SID Support
Baker CenWllR
Completions
12.50
4
Drilling
MI Save.
Mud Plant12.50
6
Dulling
Purcell
SewMy
12.506
SID Support
Ml S..
WIF
12.50
8
SID Support
ESS
Catanng
12.50
10
SID Support
Jacobs
Truck diner/Crane operator
12.50
14
Drilling
Doyon
Rtg Personnel
1250
25
Dtlllmg_Totel Drilling Personnel
BOP Stack 6 Components
Description
Shit Data Last !!= more Pressure Rann9 (pal)
Type
Make Molal
10 Nom (in)
P Range (pail Last Can Date
Slow Circulation Rates
Pump Number: Make:
Modid:
Start Data I End Date
Liner Size put
volume Per Stroke Override (bbi/sti) I Max Pressure (pal)
Cate
I Depth NKB)
Slow Sad
Stiokes(apml
P(Psll
BY I%) QRate (giblet
Daily Bulk
Supply Item Description: Equipment Fund
Unit Label:
Gal
Unit Son:1
Note:
Data Consumed Recetvetl
Returnetl
Cum Consumed Cum Received
Cum Returned Com On Loc
Note
4252019 1.2690 1269.0
11,083.0
110830
I
0.0
I
Supply OeserPa...Mud Plant Boilers
Uen Label:
Gal
Unit Size:
Note:
ad
Cate Consumed Received
Returnetl
Cum Consumetl Cum Racalved
um Returned Cum On Loc
Note
4252018 42.0 42.0
378.0
378.0
0.0 0.0
Supply Item Desorption: We Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Date Consumetl Reuivetl
Returned
Cum Consumed
tum Received
Cu. Returnetl Cum On Loc
Note
42512019 2,061.0 3.852.0
1],044.0
23,9,8.0
0.0 8.864.0
Supply lam DtlMpti9n: Rig Water
Unit Label:
led
Unit Size: t
Note:
Dab Loneumad Resolved
Returned
Cu. Consumed
Cum Received
Cum Returned Cum On Loc
Note
42512019 490 500
3850
400.0
0.0 15.0
Supply have generation: WIF Bogah
UMILdial:
Gal
Unit Sea
Note:
Cate Consumetl Receivetl
Returned Cum Consumed
Cum Received
Cum Returned Cum On Loc
Note
0/2Y1019 198.0 1980
1,182.0
1,782.0
,a 0.0
Supptylten Deeeription: WIF lnlecied Diesel
UNtlabN:
Gel
Unit Size:
Note:
Date Consumed Receivetl
Returned
Cum Consumed
CUm Receivetl
Cum Returned Cu. On Lae
Note
4125!1019 4200 4200
I
4,620.0
4,620.0
I 0,0 0.0
I
LaSt Authority Visit
Dace Tot ins, Nbr
Total I.N.C. number Comment
4202018
AOGCC Jeff Jaren wllneaeed BOPS Test 4120119
ST P Cards Submitted
Company
#Russ
Lam
Doyon Dolling
1
J M'
Doyon Drilling Inc.
19
HRWS
Doyon Drilling Inc.
19
cow
Dayan Drilling Inc.
13
Sale Cards
Ml Swaco
a
IBARC/JSA
Ml Swaco
8
RIRs
Well Name: SP36-W5 OR
Wellbore Name: SP36-W5
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 412512019
Report #: 9
Page: 3 of 3
Well Name: SP36-W5 OR
Wellbore Name: SP36-WS
Well Code: 27335
Job: WORKOVER
WCER Level:
Daily Report
Date: 4/17/2019
Report III: 1
Page: 2 of 2
Personnel Log (POB)
Company
Serv. Type
Work H(m)
Strri H Nu)
Count
Nola
FCS
Enviramental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Wynn
Tool "share
12.50
2
During
Doyon
HSE
12.50
2
Drilling
Halliburton
Mud Loggers
12.50
2
Drilling
Halliburton
ECD
12.50
2
Dnllmg
MI Swem
Mud Ergs.
12.50
2
Dnllteg
SLB
Cement
12.50
2
Drilling
Conn'tenge
Logone
12.50
4
SID Support
MI Swam
Mud Plant
12.50
6
Drilling
Purcell
Security12.50
6
SID Support
W SWaco
WIF
12.50
8
SID Suppert
ESS
teri
Cang
12.50
10
SID Support
Jacobs
Truck driver I Crane operator
12.50
14
Drilling
Wynn
Rig Pereomel
12 W
26
Drilling Total Drilling Personnel 67
BOP Stack 8 Components
Description
Start Cote
Last CertlBcatlun Data Pressure Rating (psi)
Type
Make
Moral
ID Nom (I.)
PRange (psi) feel Gert Dale
Slow Circulation Rates
Pump Number: Make:
Model:
StartCola End DMe
Liner Size (int
Volume
Per Stroke Override (bbl/sur) Max Pressure (psi)
Date Deptb /rice)
Slow Spot
Strokes(spm)
Plpsll
EN I%) F OFlow (gpm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gal
Unit Size:l
No.
Dale Consumed Received
Returned
Cum Consumed Cum Received
Cum Retumed
Cum On Loc Note
4/17Y019 1,243.0 1,243.0
1,2430
1,2430
O.0
0.0
Supply Item Description: Men Plant Boilers
Unit Label:
Gal
Unit Size:
Note:
DateConsumetl Received
Returned
Cum Consumed Cum Reconvert
Cum Returned
Cum On Loc Note
4/1]2019 42.0 42.0
42.0
420
00
00
Bu IMn Description: Rig Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Gate Consumed Receivetl
Returned
Cum Consumetl Cum Received
Cum Returned
Cum On Loc Note
4n]2018 1.388.0 10.986.0
1.388.0
10,986.0
0.0
9,598.0
Supply IMn Description: Rig Water
Unit Label:
bbl
Unit Size: 1
Note:
Dale Consumed Received
Returned
Cum Consumed Cum Receivetl
Cum Returned
Cum On Loc Note
4/1]/2019 0.0 00
0.0
0.It
0.0
0.0
Supply Nam Description: WIF Boilers
Una Label:
Gal
unit Size:
Note:
Data Consumed
Recelved
Returned
Lum Consumed Cum Receivetl
Cum Returned
Cum On Loc Note
4/1T/2019 196.0
1980
1960
198.0
0.0
0C
Supply Item Description: WIF Injected
Daniel
UMt Label:
Gal
Unit Size:
Note:
DateLOOSUmad Receivetl
Returned
Co. Consumed Cum Received
Cum Returned
Co. On Loc Nate
41171W19 420.0 420.0
420.0
420.0
0.0
0.0
Last Authority Visit
Date Tot map. NM
Total I.N.C. number Comment
STOP Cards Submitted
Company
#Burs
Com
Cayce Dnikng
4
PJSM'S
Doyon Dnlxng Inc.
4
CAW
Doyon Drilling Inc.
5
Safe Cams
Wynn Dulling Inc.
4
HIRING
MI Swaco
6
HFRC/JSF
MI Swaco
8
RIR.
General Notes
Comment:
THE STATE
ALASKA
GOVERNOR MIKE DUNLEAVY
Stefano Pierfelici
Well Operations Project Manager
Eni US Operating Co. Inc.
3800 Centerpoint Drive, Suite 300
Anchorage, AK 99503
Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP36-W5
Permit to Drill Number: 213-082
Sundry Number: 319-172
Dear Mr. Pierfelici:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
v .aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
�G�,71CIiel'owski
-e, Jessi
Commissioner
DATED this a day of April, 2019.
RBDMSLLEYAPR 0 9 2919
S;, Q"r-V7-S4lglxx
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
APR 0 3 20119
4()rrr.
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Q • Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: _ESP Change-out—E]
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
Eni US Operating Co. Inc.
Exploratory ❑ Development Q ,
Stratigraphic ❑ Service ❑
213-082 '
3. Address:
6. API Number:
3800 Centerpoint Drive, Ste, 300, Anchorage, AK 99503
50-629-23492-00-00 '
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? A
Will planned perforations require a spacing exception? Yes ❑ No ❑O
SP36-W5
9. Property Designation (Lease Number):
10. Field/Pool(s):
03912831 0388577, 0388574, 0388575
I Nikaitchuq Schrader Bluff Oil Pool
it. PRESENT WELL CONDITION SUMMARY
Total Depth MD (fl): Total Depth TVD (t): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
• 21813 3386 21130 3596 1055 N/A N/A
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20" 160 160
Surface 3470 13.375" 3470 2453 5210 2480
Intermediate 12390 9.625" 12390 3507 6890 4790
Production
Liner 959715.5" 211301 3596 slotted slotted
Perforation Depth MD (ft):
Perforation Depth TVD (fl):
Tubing Size: Tubing Grade:
Tubing M D (fl):
12,390-21,130
3,507-3,596
4.5" L80
9237
Packers and SSSV Type:
Packers and SSSV MD (fl) and TVD (fl):
WA
N/A
12. Attachments: Proposal Summary LwJ Wellbore schematic L�j
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch 2
Exploratory ❑ Stratigraphic ❑ Development Service ❑
14. Estimated Date for 4/9/2019
15. Well Status after proposed work:
Commencing Operations:
OIL WINJ ❑ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Stefano Pierfellci Contact Name: Amjad Chaudhry
Authorized Title: Well Operations Project pager Contact Email: amiad.chaudh eni.COm
Contact Phone: 907-865-3379
Authorized Signature: Date: OJLq
cOMMISS N USE ONLY
�r
that a representative may witness Sundry Number: n 1 11 L
Conditions of approval: Notify Commission 310-112-
✓,soo
Plug Integrity ❑ BOP Test M Mechanical Integrity TestLocation Clearance Elf
�❑
Other: X Sao()
�� gPR 0 91019 /
Post Initial Injection MIT Req'd? Yes F-1No❑ RBDMS✓
Spacing Exception Required? Yes ❑ No [g Subsequent Form Required:
APPROVED BY )41 I / 1
Approved by: COMMISSIONER T E COMMISSION Date: e ! l
(,N/
�' `Submit Form ani_
Form 10403 Revised 412017 A 4 roved applicat bn is valid for 12 months from the date of approval. Attachments in Duplicate
WEinio Petirdleviinn
3800 Centerpoint Drive Suite 300
Anchorage, Alaska 99503
Stefano Pierfelici
Phone(907)865-3320
Email: Stefano.Pierfelici@eni.com
April 2"d, 2019
Alaska Oil and Gas Conservation Commission
333 West 7`^ Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP36-W5 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP36-W5.
SP36-W5 was completed on Spy Island on August 181, 2013 with a conventional electric
submersible pump set at a depth of 9,456' MD. This ESP producer was completed without a
packer. The well was started up for production in August 2013. On April 151, 2019 an electrical
failure occurred to the ESP failure was occurred and ESP went down.
The estimated date for beginning this work is April 9', 2019.
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Amjad Chaudhry at 907-
865-3379.
Sincerely,
c
Stefano Pierfelici
Well Operations Project Manager
SP36-W5 Workover — Summary Page
PTD#:213-082
Current Status
Well SP36-W5 is currently down due an electric ESP failure.
Scope of Work
Scope of this workover is change ESP pump.
General Well info
Reservoir Pressure/TVD: This well is expected to have a static max bottom
hole pressure of approximately 1,450 psi (3,596'
TVD) during the time of workover, which places the
fluid level well below surface.
Wellhead type/pressure rating: Vetco Gray, MB -247/5000 psi
BOP configuration: Annular/pipe/blind rams/pipe
TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not
performed. Intermediate csg 9 5/8" was tested prior
to drill out on July 2013.
Well type:
Estimated start date:
Drilling rig:
Completion Engineer:
Senior Drilling Engineer
Producer
April 91h 2019
Doyon 15
Tommaso Mallano
Tommaso.Mallano(a)eni.com
Work: 907-865-3345
Amjad Chaudhry
Amiad.chaudhru(5)eni.com
Work: 907-865-3379
Well Operations Project Manager Stefano Pierfelici
Stefano.pierfelici(a)eni.com
Work: 907-865-3320
Procedure:
1.MIRU Doyon 15.
2. Shear upper GLM valve and pump in bull heading 9.3 ppg NaCl/KCI brine through
tree. Pump in bullheading 9.3 ppg NaCl/KCI brine in IA Ensure well is killed.
3. Set BPV. ND tree and NU BOP and test as per AOGCC requirements.
4. Pull tubing to upper GLM.
5. Shear lower GLM valve and pump in bullheading 9.3 ppg NaCl/KCI brine. -
6. Pull tubing to lower GLM. Rig up wireline and pull tubing stop check valve.
7. Circulate out remaining production fluid.
8. Continue POOH and lay down ESP assembly.
9. MU new ESP assembly and RIH to setting depth.
10. Land hanger, and test it.
11. Install BPV and nipple down BOP.
12. NU tubing adapter and tree.
13. Pull BPV, install test plug and test tree.
14. Circulate Freeze protect through tree down IA.
15. Shut in well.
16. RDMO.
Below the current schematic of the well:
Sur/. Casin 7
Baro^, 63 x \
470' MD, 2,453
TVD
IIV Inc.
11,219' MD, 3026•
TVD- L7 -Baker
SUP Liner
Hangerfloacker
Resman Oil/Water T
Sub #3
4,%' 12 6 ppf Production Tubing
2.19r MD, 1.887' TVD 53• Inc - GLM, KBMG. 4-%- x 1', with
2.000 psi STS -1 SOV installed
4-%' rcplg cable clamps. for ESP
Power Cable, (1) 3i8' Chem Inj Line
9.236' MD, 8r Inc - GLM. KBMG, 4.'/," z 1'. with 3.100 pal
STS -1 SOV installed
11,533- MW1
3,457' TVD -
Sake' SUP
Liner HangeH
Packer —
Sub #1
9,334' MD, 3.179' TVD - Discharge Gauge Sub
SP36-W5
Dual Lateral Producer
with ESP Lift
As completed
0811612013
9 438' MD. 3,205' ND. 83° Inc - Bottom of Motor Centralizer
Centdlift. TTC-ESP. 134 -stage 38OP18SXD pump. 513 GS133 seals. 150 HP MSP325 motor
9.455' MD 320 Shroud Assembly with cable and
5-7.' Silver Bullet Er
/ chemical injection line feed-Ihrus
Slotted Liner,
11,437-11.454' MD, Resman ON HAL SZ' On Swell
5-Z- Silver Bullet Ecc. b Y.^ 15.5 ppf
Planned Casing Exit Water Tracer Sub packer
Nose Guide Shoewith 20,651' MD, 3,61
Window #2
\ / / /
Bent Joint TVD
\ 96° Inc.
Interm. Casing
9-518", 40# HAL 5-%'011 Swell
12 390'MD, 3,507' TVD Packer
871 Inc,
5-7.' Silver Bullet Er
Nose Guide Shoe
1
aUa's.u"riiea a aen
'
Slotted Liner,
•' -
VA" 15.5 ppf
sLz-swuirn++. vnn
wurw+s
21130' MD, 3,596' TVD
o-vz-r..uer.as vssx
95. Inc
RIG 15 BOP STACK
HYDRIL 13-5/8" ANNULAR
"GK" 5000 PSI
STUD x FLANGE BX -160
FLOOR
;1{1YDRI�L�;
HYDRIL MPL SINGLE GATE
13-5/8" 5000 PSI
FLANGE x FLANGE BX -160
10" OPERATORS
VARIABLE PIPE RAMS ® OO
HYDRIL MPL SINGLE GATE
13-5/8" 5000 PSI
FLANGE x STUD BX -1600 0
14" OPERATORS ® ®O
BLIND/SHEAR RAMS
HYDRIL MPL SINGLE GATE ® ®�
13-5/8" 5000 PSI ®LCCot
FLANGE x FLANGE BX -160
10" OPERATORS
VARIABLE PIPE RAMS
VetcoGray MB -247
SURFACE COMPLETION SYSTEM
PRP 10161, NO
aGc imacinahcn o. work
10 OF 10 23 JANUARY 2009
• •
Com(
o
0
it"m co _
co` 0 ,_ O n ,- 0 0 0) O co) Or h O n V a 0 m ' 0 N 0 CO O a m
a M N co O 0 n n r €0 n n 0 t0 0) 00
0 j
C l0
\/1. 4, 1,
co co X on coom U)a. m v Ino °^ 5- N 5- N n N n 0) o CO N M o o v� o
NI. N II) M M N a N N M a N M
tea0
cza
Z. CV
H +
C
•0 m • CL.
7
co Yr '2, aN MOm N N W
UCC — N N a N 0 V NO a N N4) N ( l) aa M a (n
''
a O
ta
z' . 0) W 0 0) 0) 0 0) 0 co co n 0) n n m COO) n n n COCOn N CON 0) n d Q Z,
m > N r
(EOO m 9.
Sia. N Z
W N l b�
c .C9 _o ,
-� L 03 CO 0 0) (0 r N� N 0) CO N O 0) O 0) n N 0 p 0
O .V.. N M M O N O M 0 N Q O f7 O n n a )0 O ^ n N ^ 11] n V O
N m a M 0 (h a 1f1 6 co N N N 0 0 0 a n M co N Q
r Y
Z O Z a '°
0
(n o`LL C
m
0
N O.E n n co n n .- N co 0 CO N co0co00n CO CO 0 00 (O N (O n U) COnn ((CU O n yfj 0n m
)F E
EU w U W m °ZO
paAC0W1Q 5, C a NNNNrNNNNN N 0 M MM 0 N N n .- Mr rN N N N N 0CC
ggj) N0
m
N
< ti
..J N o 0 iii m
z 0 W N 0c0 N M 0 0) a a 0 Co 0 0 N O M0 '00 O N n O m M M N I- O
W U m W 0) o O) 0 O) 0 0) n co CO a 0 M 0 M a a M M N 0 0 M M Ni. a co a _
d N N N N N N N N Cl N N N N N N N N N
N y O to
F' Q J )n a
tq C72 m
0 F=- c p�
M o n N N n o o a n a 01 co 0 o t0 co 0) E M M 0 M co n n n L
y N O 0) 0 00 ) a O) �} N
Q O N V N COm 0) W fV T' Cl {9 N N N N 0 N N N N N 0 e0-
2 0. `o
C
O `o
0) r
C M n co O N n CO CO 1, C05- 5- 6510P- 0515- 051. 00051. 000 ,,,
2
(n B N ,- M N °) N Ort N N Mr m .988 .7 '4885; 0 n a a M N
3 •' N Cl N N N N N N N M C
5
f.
0 N C
co m 2
O N N N N N N ^ N N - ^ N N N N - ,Ov N N CU N N o N N N = m
2 0 r r r r O)
0 N
U E.
a w
m
c c 2 Y
m 5 E co 0 U) 0 0 0 0 0 In 0 0 O 0 0 0 0 0 0 0 0 CO 0 0 0 0 )f) 0 If) 0 0 21 E
mW m
d Y
i-i Z `o
�a H
m
m a c
ImCO 0 (0 (O t0 0 t0 m 0 0 0 0 m 0 ID CO CO CO CO m b CO ID to co 0 0 {0 0 5 2 g
`o r mc� d fd QdQ f: d 6 fcc677 (qq5 0 m 6 4.qq d�� oS n' Ids� 6 c5 m ,,_si 6 ' 4 6 v5 „A m' 5 o 0
G o 0 0 0 o S o 0 0 0 0 ; o 0 8 i i 8 i ; i b i l ; i o b t c
m 0 a;
X 0 0 0 0 0 0 0 0 0 0 Cl 0g 0 0q 0 8 O o o O o 0 0 8 m
d a d d o d o o 0 0 $ S a 0 UggRc 2
dO) O N (UI [7 '0 l+) COCOU) o O f� SIS C) d O 4p N 0 N m
X M a a CO CO 0 �7 1n v v 1� ' ui 'fit 0 a u6i U6 U m O)
Xx CO CO CO CO CO M N N M M E C
Q N N N N N N N Ni N N N N N N N N N N N N N N N N N N N N N N o 00
N N N N N N D) N N N N N N N N N N N N N N N N N N N N N N 0
0 dQ �0 O O Qa 0 (0 ((0 (0 (0 (d0 m 0 m O (0 (0 m m CO' O
6 1(00 I Ido to 10 10 )O N 110 Yl Ido U)) (1) Y] C)) U)) If) 100 10 60 H 0 (t0 (O 1a0 (1) N 0 It. 2
Om
C N
m r 41 G
S. 9 m 4' E Y
CO o
0 P A Z o rasa o o M O o c0 Z W W 1.-.
n Z W Z 0 _ n r z _a,'
15 a a a a in a a CO a a o F tn Z () W '� v
E ° ? O 0. 0 0 0 d N CO CL Or CO O) 9 -! LL Z LL f0 ll Z N Z C0�{ Z Z p3 5 4. �5 (5 .y.
a 0clic 0 1 N 1 d N N f` N N !7 !9 m 'C
co w 3 a a a a a a a a n. a a a a a a a a a a a a N a a a a a a a a — - a
0 0 0 0 0 0 0 0 0 0 0 0 0 (n CO CO CO CO (A CO CO N co co co co co co co N ¢ —
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Doyon 15
Date: August 15, 2013
Surface Data Logging
End of Well Report
SP36-W5
SP36-W5 L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Show Reports
7. Mud Record
8. Bit Record
9. Morning Reports
10. Survey Report
Digital Data to include:
Final Logs
Halliburton Log Viewer
EMF Log Viewer
EOW Report PDF Version
ADI Backup
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Doyon 15
Well: SP36-W5 & SP36-W5 L1
Field: Nikaitchuq
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-629-23492-00-00 (SP36-W5)
50-629-23492-60-00 (SP36-W5 L1)
Sperry Job Number: AK-AM-0900577139
Job Start Date: 28 June 2013
Spud Date: 30 June 2013
Total Depth: 21813’ MD, 3396.14’ TVD (SP36-W5)
20870’ MD, 3422.79’ TVD (SP36-W5 L1)
North Reference: True North
Declination: 19.825°
Dip Angle: 81.079°
Total Field Strength: 57610.778 nT
Date Of Magnetic Data: 27 July 2013
Wellhead Coordinates N: North 70° 33’ 27.62282”
Wellhead Coordinates W: West 149° 54’ 23.07478“
Drill Floor Elevation 53.67’
Ground Elevation: 13.10’
Permanent Datum: Mean Sea Level
SDL Engineers: Leigh Ann Rasher, Kori Jo Plowman,
Clifton Posey, Alexander Kalenuik, Jeremy Tiegs
SDL Sample Catchers: Chris Woolley, Chance Taylor, Jason Ostrem,
Jeremy Tiegs
Company Geologist: Andrew Buchanan
Company Representatives: Jack Keener, Mike Ross
SSDS Unit Number: 110
DAILY SUMMARY
06/28/2013
SDL continues on location from previous well. Move rig.
06/29/2013
Spot and set mudlogging shack. Wait on the unit to warm up before rigging up. Rig up
mudlogging shack. Continue rig up operations on rig. Rig up suitcases and test. Pick up 5” drill
pipe. Perform 13-3/8” dummy hanger run. Rack back heavy weight drill pipe, jars, and non
magnetic drill flex collar. Fill conductor and check for leaks. Pressure test mud pumps. Pick up
conductor clean out BHA #1. Tag bottom at 62’ MD. Clean out conductor at 126’ MD.
06/30/2013
Circulate hole clean. Pull out of hole from 165’ MD. Pick up BHA #2 and shallow test MWD
tools. Drill ahead to 405’ MD and back ream out of hole to pick up BHA. Run in hole to 405’ MD
and drill ahead to 1151’ MD. No samples collected during surface section.
Gas: The max gas was 52 units at 1056’ MD.
07/01/2013
Drill ahead from 1151’ MD to 3110’ MD.
Gas: The max gas was 1455 units at 2238’ MD.
07/02/2013
Drill ahead from 3110’ MD to surface section TD of 3484’ MD. Back ream out of hole per K&M
rep. Lay down BHA #2 and begin rigging up casing equipment.
Gas: The max gas was 94 units at 3450’ MD and 886 units while back reaming out of hole.
07/03/2013
Continue to rig up casing equipment. Run in hole to 315’ MD and make up shoe track. Continue
to run in hole with 13-3/8” casing to 3470’ MD. Circulate and condition mud. Rig up cement
equipment and cement 13-3/8” casing.
Gas: The max gas was 118 units.
07/04/2013
Continue to cement 13-3/8” casing. Rig down cement equipment and lay down landing joint.
Nipple down diverter stack and nipple up BOP stack. Set test plug and test BOP. Begin picking
up 5” drill pipe.
07/05/2013
Test BOP. Continue to pick up 5” drill pipe. Pick up and make up BHA #3. Run in hole with BHA
#3 and test tools. Continue to run in hole.
07/06/2013
Continue to run in hole to 3242’ MD. Wash down to top of cement plug at 3382’ MD and
circulate bottoms up. Test 13-3/8” casing to 2500 psi for 30 minutes. Drill shoe track and rat
hole to 3484’ MD. Drill 20’ of new formation to 3504’ MD. Displace mud to LSND and cut and
slip drill line. Perform leak off test to 11.16 ppg EMW. Drill ahead from 3504’ MD to 4640’ MD.
Gas: The max gas was 286 units at 3713’ MD.
Geology: Cuttings consist mainly of sandstone with local silts.
07/07/2013
Drill ahead from 4640’ MD to 7910’ MD.
Gas: The max gas was 117 units at 4994’ MD.
Geology: Cuttings consist mainly of sandstone with local silts and some coal cuttings from
4900’ MD to 5000’ MD.
07/08/2013
Drill ahead from 7910’ MD to 9400’ MD.
Gas: The max gas was 41 units at 8815’ MD.
Geology: Cuttings consist mainly of sandstone.
07/09/2013
Drill ahead from 9400’ MD to 9599’ MD. Begin back ream out of hole due to low ROP.
Gas: The max gas was 29 units at 9404’ MD.
Geology: Cuttings consist mainly of clean sandstone. Metal shavings observed in samples.
07/10/2013
Continue to back ream out of hole. Lay down BHA #3. Pick up BHA #4 and begin run in hole.
Gas: The max gas was 48 units.
Geology: Cuttings consist mainly of sandstone.
07/11/2013
Continue to wash and ream to 9599’ MD. Drill ahead from 9599’ MD to 12015’ MD.
Gas: The max gas was 525 units at 11361’ MD.
Geology: Cuttings consist mainly of clean sandstone with some silt from 9599’ MD to 11500’
MD. Siltstone became dominant with some sand and 5-10% shale fragments from 11550’ MD to
12000’ MD.
07/12/2013
Drill ahead from 12015’ MD to intermediate TD of 12405’ MD. Begin back ream out of hole.
Gas: The max gas was 70 units at 12333’ MD and 81 units while back ream out of hole.
Geology: Cuttings consist mainly of siltstone with some sand and shale.
07/13/2013
Continue to back ream out of hole. Lay down BHA #4. Test rams and begin to rig up casing
equipment.
Gas: The max gas was 26 units.
07/14/2013
Continue to rig up casing equipment. Make up shoe track to 165’ MD. Run in hole with 9-5/8”
casing. Make up landing joint and land casing at 12390’ MD. Rig down casing equipment and
begin to fill casing.
07/15/2013
Continue to fill 9-5/8” casing. Rig up cement equipment and cement 9-5/8” casing. Rig down
cement equipment and prepare to cut casing.
07/16/2013
Nipple up BOP equipment and test pack off. Set test plug and test body. Pick up 4.5” drill pipe.
Cut and slip line, and service draw works. Rig up and test BOPE.
07/17/2013
Complete BOP test. Pick up BHA #5 and 8.75” PDC bit. Run in hole to 1213’ MD and shallow
test. Continue to run in hole. Ream in hole at 40 rpm to 12188’ MD. Wash and ream to 12281’
MD. Test casing to 3000 psi for 30 minutes. Prepare to displace LSND mud to oil based mud.
07/18/2013
Displace LSND mud to oil based mud. Drill shoe track cement to shoe and 20’ of new hole to
12425’ MD. Drill 8.75” production hole with tapered drill string.
Gas: The max gas was 1305 units at 13455’ MD.
Geology: Samples consist of mainly clean sandstone.
07/19/2013
Drill ahead from 13772’ MD to 16137’ MD.
Gas: The max gas was 1989 units at 14940’ MD.
Geology: Samples consist of mainly clean sandstone.
07/20/2013
Drill ahead from 16137’ MD to 18629’ MD.
Gas: The max gas was 1217 units at 18390’ MD.
Geology: Samples consist of mainly clean sandstone.
07/21/2013
Drill ahead from 18629’ MD to 19843’ MD.
Gas: The max gas was 1095 units at 19130’ MD.
Geology: Samples consist of mainly clean sandstone.
07/22/2013
Drill ahead from 19843’ MD to 21813’ MD.
Gas: The max gas was 1036 units at 19904’ MD.
Geology: Samples consist of mainly clean sandstone.
07/23/2013
Back ream out of hole from 21813’ MD to 11729’ MD.
07/24/2013
Back ream out of hole from 11729’ MD. Cut and slip drill line.
07/25/2013
Run in the hole with 5.5” liner to 21813’ MD. Set casing shoe.
07/26/2013
Complete work on top drive.
07/27/2013
Rig up wireline equipment. Moisture related interference with the tools caused malfunctions.
07/28/2013
Run in hole with Baker bullnose. Pull out of hole from clean out line. Rigged up wireline and ran
tools down hole with no problems.
07/29/2013
Test BOP’s.
07/30/2013
Run in hole with Whipstock Mill, set the Whipstock, displace mud, and then perform top drive
maintenance.
Gas: The max gas was 30 units at 11472’ MD.
07/31/2013
Drill ahead from 11482’ MD to 11501’ MD to drill out window in the casing.
Gas: The max gas was 25 units at 11485’ MD.
Geology: Samples consist of mainly clean sandstone.
08/01/2013
Drill ahead from 11501’ MD to 11620’ MD. Pull out of hole to change out BHA and remove mud
motor.
Gas: The max gas was 63 units at 11620’ MD.
Geology: Samples consist of mainly clean sandstone.
08/02/2013
Drill ahead from 11620’ MD to 12465’ MD. Back ream out of hole from 12465’ MD to 11454’ MD
and perform a FIT. Run in hole and drill ahead.
Gas: The max gas was 805 units at 12582’ MD.
Geology: Samples consist of mainly clean sandstone.
08/03/2013
Drill ahead from 12652’ MD to 15364’ MD
Gas: The max gas was 2145 units at 15320’ MD.
Geology: Samples consist of mainly clean sandstone and some siltstone.
08/04/2013
Drill ahead from 15364’ MD to 17789’ MD
Gas: The max gas was 1333 units at 17724’ MD.
Geology: Samples consist of mainly clean sandstone.
08/05/2013
Drill ahead from 17789’ MD to 19636’ MD
Gas: The max gas was 978 units at 19562’ MD.
Geology: Samples consist of mainly clean sandstone.
08/06/2013
Drill ahead from 19636’ MD to 20870’ MD. Well SP36-W5L1 has reached TD. BROOH started.
Gas: The max gas was 841 units at 20869’ MD.
Geology: Samples consist of mainly clean sandstone.
08/07/2013
Back ream out of hole from 20870’ MD to 9994’ MD.
08/08/2013
Back ream out of hole from 9994’ MD to surface. Start to run in hole with BHA #9 to retrieve the
whipstock but MWD equipment began to malfunction and had to pull out of hole from 2883’ MD.
08/09/2013
Debris was visible in the MWD components and was removed. Run in hole from surface to
11441’ MD and tagged the hook slot for whipstock and successfully retrieved it. Begin to pull out
of hole.
08/10/2013
Continue to pull the whipstock BHA out of the hole and then lay down the BHA. Rig up Franks
casing running equipment. Start to run in hole with 5.5” liner from surface to 6027’ MD.
08/11/2013
Continue to run 5.5” liner. Liner top is at 11220’ MD. Prepare to displace mud.
8/12/2013
Displace oil-based mud to Brine. Slip and cut drill line. Pull out of hole and lay down 5” drill pipe,
and running tool. Rig up and begin testing BOP’s.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
23000
24000
0 5 10 15 20 25 30 35 40 45
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
Days vs. Depth
28 Jun 2013
Sperry SDL continues on location
from previous well
WELL NAME: SP36-W5 & SP36-W5 L1
OPERATOR: ENI Petroleum
MUD CO: MI Swaco
RIG: Doyon 15
SPERRY JOB: AK-AM-0900577139
LOCATION: North Slope
AREA: Spy Island
STATE: Alaska
SPUD: 30-Jun-2013
TD: 6-Aug-2013
Commenced 16" Surface
Hole Section
On Bot: 07:00 30 Jun 2013
TD Surface Hole Section
3484' MD, 2452' TVD
Off Bot: 07:30 02 Jul 2013
Landed 13 3/8" Casing
3470' MD, 2450' TVD
03 Jul 2013
Commenced 12.25" Intermediate
Hole Section
On Bot: 1530 06 Jul 2013
Drill 12.25" hole to 9599' MD
POOH due to low ROP
Off Bot: 06:10 09 Jul 2013
Resume 12.25" Hole Section
On Bot: 05:15 11 Jul 2013
TD Intermediate Hole Section
12405' MD, 3506' TVD
Off Bot: 04:05 12 Jul 2013
Landed 9 5/8" Casing
12390' MD, 3507' TVD
14 Jul 2013
Commenced 8.75" Production
Hole Section
On Bot: 07:42 17 July 2013
TD Production Hole Section
21813' MD, 3745' TVD
Off Bot: 20:15 22 July 2013
Run 5.5" liner and RIH with
Whipstock Mill. Set whip stock in
preperation for SP36-W5 L1
23-30 July 2013
Commenced 8.75" Production L1
Hole Section
On Bot: 17:15 04 Aug 2013
TD Production Hole Section
20870' MD, 3539' TVD
Off Bot: 17:30 06 Aug 2013
WELL NAME:LOCATION:North Slope
OPERATOR:AREA:Spy Island
SPERRY JOB:STATE:Alaska
RIG:Doyon 15 HOLE SECTION:Surface
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ENI Petroleum
AK-AM-0900577139
Leigh Ann Rasher 4-Jul-2013
SP36-W5
What went as, or better than, planned:
The gas chromatograph had a lot of "noise" during surface section. We are not sure if it was the cord
connecting the chromatograph to the Iris computer or if it is a problem with the chromatograph itself.
During the surface section casing run the chromatograph and cord were switched out and no problems
have been experienced since.
Recommendations:
Innovations and/or cost savings:
Surface section was completed with no major issues. Weight on bit tracked better than normal after
checking the "Use 3rd Party WOB" box under the WOB configurations in the 'Configure and Monitor
Rig Floor' window.
Difficulties experienced:
Use the "WOB from 3rd party" options for upcoming wells. After well is complete looking into getting
new cord sent out for the chromatograph to find out if that solves the problem with "noise". If not the old
chromatograph should be sent to town and a new backup should be sent to location.
N/A
Surface Data Logging
After Action Review
WELL NAME:LOCATION:North Slope
OPERATOR:AREA:Spy Island
SPERRY JOB:STATE:Alaska
RIG:Doyon 15 HOLE SECTION:Intermediate
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ENI Petroleum
AK-AM-0900577139
Leigh Ann Rasher 13-Jul-2013
SP36-W5
What went as, or better than, planned:
No major difficultes were experienced. The canrig computer did freeze towards the beginning of the
section and was fixed by closing out the RigWatch program and restarting it. The bit depth got thrown
off a few times during connections.
Recommendations:
Innovations and/or cost savings:
Intermediate section was completed with no major problems. The gas chromatograph was switched out
after surface casing was cemented and functioned well.
Difficulties experienced:
Compare bit depth with the pipe tally during each connection to make sure it stays on track.
N/A
Surface Data Logging
After Action Review
WELL NAME:LOCATION:North Slope
OPERATOR:AREA:Spy Island
SPERRY JOB:STATE:Alaska
RIG:Doyon 15 HOLE SECTION:Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ENI Petroleum
AK-AM-0900577139
Paul Kalenuik 25-Jul-2013
SP36-W5
What went as, or better than, planned:
During the drilling of the production run, we had and electrical issue with the cord on the Workstation
computer. The connection between the computer and the cord had a gap and there was a short. We
disconnected the cord and replace it. That solved the issue and it has been operating fine ever since.
Recommendations:
Innovations and/or cost savings:
This section was completed with no major issues. Can Rig tracked better than normal. We
experiencede no failures from Can Rig. Depth tracked better than expected also. The bore tracked
within a tenth of a foot to one foot with the Wits data we recieved from SLB.
Difficulties experienced:
Provide or install a monitor on the rig floor so that our drilling parameters can be tracked by them. Very
often the drilling depth that is on the Can Rig monitor is different from the depth that SLB and Insite is
showing. This would allow for more acurate tracking of depth for all parties.
N/A
Surface Data Logging
After Action Review
WELL NAME:LOCATION:North Slope
OPERATOR:AREA:Spy Island
SPERRY JOB:STATE:Alaska
RIG:Doyon 15 HOLE SECTION:Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
What went as, or better than, planned:
During the drilling of the production run, L1, we had an issue with the gas chromatograph powering
down. Chromatograph data was lost from roughly 18200' MD to 19000' MD.
Recommendations:
Innovations and/or cost savings:
Production section, L1, was completed with no major issues. Can Rig tracked better than normal. We
experienced no failures from Can Rig. Depth tracked better than expected also.
Difficulties experienced:
Check power connections to gas equipment and make sure the 8900 Chromatograph within Insite is
always running.
N/A
ENI Petroleum
AK-AM-0900577139
Kori Jo Plowman 7-Aug-2013
SP36-W5 L1
Surface Data Logging
After Action Review
WELL NAME:SP36-W5 LOCATION:Spy Island
OPERATOR:ENI Petroleum AREA:North Slope
MUD CO:M I Swaco STATE:Alaska
RIG:Doyon 15 SPUD:30-Jun-2013
SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013
Marker MD INC AZ TVD TVDSS
16" Surface Borehole
20" Conductor Shoe 160.0 0.6 173.5 160.0 -106.3
SV-4 769.0 19.6 199.6 758.7 -705.0
SV-3 1,164.0 31.0 193.5 1,112.1 -1,058.4
SV-2 1,480.00 36.8 192.1 1,373.1 -1,319.4
Permafrost Base 1,980.0 44.7 197.7 1,746.4 -1,692.8
SV-1 2,233.0 53.0 198.3 1,910.9 -1,857.2
Ugnu Top (UG4)2,829.0 57.7 215.9 2,217.5 -2,163.8
13 3/8" Casing Shoe 3,470.0 81.4 235.2 2,451.9 -2,398.3
TD 16" Borehole 3,484.0 81.6 235.3 2,454.0 -2,400.3
12 1/4" Intermediate Borehole
Fault 4 4,951.0 83.1 228.5 2,634.2 -2,580.5
UG-2 Coal Bed Marker 5,010.0 83.4 228.5 2,641.1 -2,587.4
Lower Ugnu 8,831.0 82.9 231.0 3,127.2 -3,073.5
Schrader Bluff 10,233.0 82.5 255.3 3,315.6 -3,261.9
N Sequence Top 10,516.0 82.8 270.6 3,352.1 -3,298.4
N Sand Top 10,827.0 84.4 277.6 3,386.0 -3,332.3
N 2 10,916.0 84.5 279.4 3,394.5 -3,340.8
N 3 10,956.0 84.6 280.1 3,398.3 -3,344.6
N Sand Bottom 11,087.0 84.5 282.9 3,410.9 -3,357.2
N Sequence Base 11,542.0 84.1 293.8 3,455.4 -3,401.7
9 5/8" Intermed. Casing 12,390.0 87.0 314.9 3,503.8 -3,450.1
TD 12 1/4" Borehole 12,405.0 87.0 314.6 3,504.6 -3,450.9
8 3/4" Lateral
OA Sand Top 12,682.0 85.3 310.4 3,519.8 -3,466.1
OA sbl 2 Top 12,741.0 85.8 310.1 3,525.0 -3,471.3
OA sbl 3 Top 12,818.0 87.6 309.7 3,529.3 -3,475.6
OA sbl3 Top 13,934.0 92.9 311.1 3,523.2 -3,469.5
OA sbl 2 Top 14,201.0 91.3 311.4 3,516.8 -3,463.1
OA sbl2 Top 15,018.0 89.1 311.4 3,510.2 -3,456.5
OA sbl3 Top 15,264.0 88.6 311.2 3,512.2 -3,458.5
OA sbl3 Top 16,850.0 92.4 312.1 3,511.3 -3,457.6
OA sbl2 Top 16,990.0 91.7 311.8 3,505.4 -3,451.7
Fault 1 17,473.0 90.0 310.8 3,503.5 -3,449.8
OA Sand Top 17,694.0 86.3 310.1 3,535.6 -3,481.9
OA sbl2 Top 18,629.0 88.0 310.7 3,543.7 -3,490.0
OA sbl3 Top 18,819.0 87.1 310.6 3,554.2 -3,500.5
OA sbl3 Top 19,551.0 90.0 312.3 3,557.4 -3,503.7
OA sbl 3 Top 19,615.0 88.1 311.8 3,559.1 -3,505.4
Fault 2 19,862.0 89.0 311.6 3,574.3 -3,520.6
OA sbl2 Top 19,907.0 91.3 311.6 3,574.2 -3,520.5
OA Sand Top 20,076.0 92.8 312.5 3,567.5 -3,513.8
OA Sand Top 20,431.0 85.7 311.3 3,578.2 -3,524.5
OA Sand Top 20,967.0 92.2 311.8 3,588.8 -3,535.1
N Sequence Base 21,364.0 105.7 310.8 3,539.6 -3,485.9
N Sand Bottom 21,520.0 110.3 311.1 3,490.6 -3,436.9
N Sand Top 21,639.0 111.5 310.7 3,448.4 -3,394.7
N Sequence Top 21,656.0 111.9 310.7 3,442.1 -3,388.4
TD 8 3/4" Lateral 21,813.0 113.4 311.4 3,396.1 -3,342.5
Formation Tops
WELL NAME:SP36-W5 L1 LOCATION:Spy Island
OPERATOR:ENI Petroleum AREA:North Slope
MUD CO:M I Swaco STATE:Alaska
RIG:Doyon 15 SPUD:30-Jun-2013
SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013
Marker MD INC AZ TVD TVDSS
8 3/4" Leg 1
Top of Window 11,437.0 84.4 290.8 3,444.9 -3,391.2
Bottom of Window 11,454.0 84.4 288.7 3,446.5 -3,392.9
N Sequence Base 11,542.0 83.4 289.8 3,455.9 -3,402.2
OA Sand Top 12,419.0 86.7 313.3 3,517.4 -3,463.7
OA sbl2 12,567.0 90.1 314.8 3,522.2 -3,468.5
OA sbl2 12,630.0 90.8 314.5 3,521.9 -3,468.2
OA sbl2 13,982.0 86.8 309.1 3,515.8 -3,462.1
OA sbl3 14,049.0 87.1 310.7 3,519.5 -3,465.8
OA sbl3 15,547.0 92.0 311.9 3,515.8 -3,462.1
OA sbl2 15,653.0 92.2 312.3 3,511.2 -3,457.5
OA sbl2 16,661.0 86.6 310.8 3,500.1 -3,446.4
OA sbl3 16,754.0 88.0 310.1 3,505.2 -3,451.5
OA sbl4 17,649.0 87.5 310.9 3,530.2 -3,476.5
OA sbl4 18,022.0 92.1 312.9 3,534.9 -3,481.2
OA sbl3 18,431.0 92.4 316.2 3,529.9 -3,476.2
OA sbl2 18,499.0 92.5 316.0 3,526.7 -3,473.0
OA Sand Top 19,119.0 89.9 310.8 3,525.0 -3,471.3
OA Sand Top 19,178.0 88.5 311.9 3,526.6 -3,472.9
Fault A 19,262.0 87.1 312.1 3,530.6 -3,476.9
OA Sand Top 19,366.0 85.6 311.0 3,537.2 -3,483.5
OA sbl2 19,492.0 86.2 311.0 3,546.8 -3,493.1
Fault B 19,596.0 86.5 309.8 3,553.0 -3,499.3
OA Sand Top 19,647.0 86.9 309.3 3,556.0 -3,502.3
OA sbl2 20,000.0 87.1 309.7 3,564.2 -3,510.5
OA sbl2 20,248.0 91.5 310.5 3,563.9 -3,510.2
Fault C 20,470.0 88.8 310.5 3,563.4 -3,509.7
OA sand base 20,558.0 91.9 310.7 3,563.5 -3,509.8
Fault D 20,630.0 92.8 312.2 3,560.0 -3,506.3
TD 8 3/4" L1 20,870.0 97.2 314.0 3,539.8 -3,486.1
Formation Tops
Show Report Rt # 1 Show Report Report # 1
Well Name: Depth (MD) to ft
Location:(TVD)to ft
11400
3445
10800
3380
SP36-W5
Spy IslandLocation:(TVD)to ft
Operator:
Report Prepared By:Formation:
34453380
N Sand
Spy Island
ENI Petroluem
Leigh Ann RasherReport Prepared By:Formation:
Report Delivered To: Date:
N-Sand
11-Jul-2013
Leigh Ann Rasher
Andrew Buchanan
Interpretation:
No producible oil within these zones based upon gas and chromatograph data collected.
Interpretation:
Hydrocarbon Ratios
Dt h ft G Ui t Md C h l i d ( / L )C1 C1 C1 C1
1
150010850343DepthftGasUnitsMud Chlorides (mg/L) =C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
150010850343
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =42372 7239601 2771 1000
C2 -=C1/C3 =
C3 -=C1/C4 =
548
154 7 147
573 25 269
184
C4 -=C1/C5 =
C5 -=0 71 71
558215 222 7 NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
100
Depth ft Gas Units Mud Chlorides (mg/L) =
Fl li Bk d Sh
2
150010937 301 Gas
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios 10Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
2771 70
247514
37070 34299
489 25
10
C3 -=C1/C4 =
C4 -=C1/C5 =
7 139
173 7
146
166
207
953
Oil
C5 -=
Production
36 0 36 1
NPH
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios3
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
25811047 1500
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =31008 6542 24466 71 1000C1C1/C2
C2 -=C1/C3 =
C3 =C1/C4 =155 99 56
453 109 344
31008 6542 24466
247
302
71
NPH
C4 -=C1/C5 =
C5 -=
184
44
103 81
-10 54
-2447
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
100
Depth ft Gas Units Mud Chlorides (mg/L) =
4
52511361 1500 Gas
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios 10Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
52325 16167
839 273 566
36158
120
64
10
OilC2C1/C3
C3 -=C1/C4 =
C4 -=C1/C5 =550 288 262
839 273 566
463 162 301
120
138
36158
C5 -=
Production
213 212 1 1
NPH
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
22-Jul-2013
91000
119
SP36-W5
Spy Island
ENI Petroluem
Paul Kalenuik
Andrew Buchanan
79
127177
Interpretation:
Show Report Report # 2
15127
3516
13411
3539
OA-Sand
131
48
114
5
22
91
398 453
924 166
21820
108 336
1347
13535
116289 12666
104 1243
1083
-10363
91000
259
334
122
116000
149
198
21
930 970 -40
1144 1200
799 830
126934 124558 2376
116814
103623
185
267
-56
648-31
1182 1162 20
444
1082 85
1060 463
1167
597
988 535 453
1477 1236 241
1090
882 12
851
870
171024 149204
1587815127
543 383
No producible oil within these zones based upon gas and chromatograph data collected.
160
115214474
106000134111265
1
2
3
4
601 410 191
283 -16
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis x Gas Oil Water Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
570 55 515
24 288
667 31
No producible oil within these zones based upon gas and chromatograph data collection.
636
111516695
2000160371115
1275 1043
562
232
94517 3669
47516879
461 75 386
1161 58 1103
1052
1432 184 1248
692
83 1152
548 63
1235
485
116846 9043 107803
63106
2314
89
312
675
210616
611 65 546
728 53
663 47
60389
2000
111
98
85
2000
101
103
239
1423
16310
118230 115916
1367 56
1115
140 422
72 980
90848
633 59
93
235
176
255
170
82
Interpretation:
Show Report Report # 3
17000
3510
16000
3524
OA Sands
25-Jul-2013
2000
86
SP36-W5
Spy Island
ENI Petroluem
Kori Jo Plowman
Andrew Buchanan
182
2717
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
390 61 329
54 268
338 70
No producible oil within these zones based upon gas and chromatograph data collected.
268
87720625
2000197801187
519 446
307
73
110557 6465
101620903
381 81 300
1149 94 1055
608
975 106 869
310
116 492
328 94
608
234
98088 9398 88690
129336
9244
102
322
1222
464749
825 74 751
1300 78
820 71
124261
2000
165
166
104
2000
192
199
404
1036
20009
103760 94516
908 128
949
68 239
75 533
104092
258 52
195
347
316
371
344
99
Interpretation:
Show Report Report # 4
20900
3604
19700
3575
OA Sands
25-Jul-2013
2000
102
SP36-W5
Spy Island
ENI Petroluem
Kori Jo Plowman
Andrew Buchanan
353
5075
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Show Report Report # 5 Show Report Report # 5
Well Name: Depth (MD) to ft
Location: (TVD) to ft
SP36-W5
Spy Island
20900
3604
19700
3575 Location: (TVD) to ft
Operator:
Report Prepared By: Formation:
Spy Island
ENI Petroluem
Kori Jo Plowman
3604 3575
OA Sands Report Prepared By: Formation:
Report Delivered To: Date: 25-Jul-2013
Kori Jo Plowman
Andrew Buchanan
OA Sands
Interpretation: Interpretation:
No producible oil within these zones based upon gas and chromatograph data collected.
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 2000 19780 1187
1
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 .
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
2000 19780 1187
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =5075 124261 129336 102 1000 C1 -=C1/C2 =
C2 - =C1/C3 =
C3 - =C1/C4 =
5075 124261
165
166 825 74 751
1300 78
129336 102
1222
NPH C4 - =C1/C5 =
C5 - =
825 74 751
820 71
322
464 749
54 268
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
2
100
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
20009 949 2000
2
Gas
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios 10 Hydrocarbon Ratios
C1 - =C1/C2 =
C2 -=C1/C3 =1036
103760 94516
908 128
104
192
9244
10
C2 -=C1/C3 =
C3 - =C1/C4 =
C4 - =C1/C5 =353
1036 908 128 192
404 116 492
328 94
608
234
Oil
C4 C1/C5 =
C5 - =
Production
353 328 94 234
338 70 268
1
NPH
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 2000 877 20625
3
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1 .
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
2000 877 20625
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =102 98088 9398 88690 1000
C1 -=C1/C2 =
C2 - =C1/C3 =
C3 =C1/C4 =
102
371
199
98088 9398 88690
975 106 869
519 446 73 NPH C3 =C1/C4 =
C4 - =C1/C5 =
C5 -=
371
344 68 239
258 52 310
519 446
307
73 NPH
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
258 52 310
4
100
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
2000 1016 20903
4
Gas
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios 10 Hydrocarbon Ratios
C1 - =C1/C2 =
C2 -=C1/C3 =195
99 104092
1149 94 1055
110557 6465
10
Oil C2 -=C1/C3 =
C3 - =C1/C4 =
C4 -=C1/C5 =
195
347
316
75 533
381 81 300
1149 94 1055
608
NPH
C4 -=C1/C5 =
C5 - =
Production
316
0.00
381 81 300
390 61 329 1
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis x Gas Oil Water Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
4-Aug-2013
91000
192
SP36-W5 L1
Spy Island
ENI Petroluem
Paul Kalenuik
Andrew Buchanan
170
158427
Interpretation:
Show Report Report # 6
15279
3283
14676
3283
OA-Sand
300
54
212
198
490
158
493 379
772 75
22504
153 374
1234
14837
101214 38823
396 838
2145
15961
91000
55
58
98
91000
128
333
116
1212 921 291
1541 1222
1239 962
185482 110454 75028
174388
62391
50
501
319
161277
1356 965 391
527
787 304
818 483
1091
335
825 411 414
1095 953 142
847
998 225
872
773
112793 90289
102015279
594 365
No producible oil within these zones based upon gas and chromatograph data collected.
229
181114924
91000146761668
1
2
3
4
485 379 106
402 99
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
499 381 118
480 4
572 441
No producible oil within these zones based upon gas and chromatograph data collected.
131
107217303
84000166211079
1156 74
1047
1082
99126 94475
91218018
916 438 478
1143 1086 57
947
1356 1264 92
597
1082 33
1046 480
1115
566
116498 108152 8346
112980
107794
87
484
18
39414
1113 1094 19
1283 1265
1088 1074
1574
83000
83
112
117
84000
195
113
11
1293
17075
114215 6421
55 1238
1061
498 549
912 35
4651
178 419
133
10
39
15
47
82
Interpretation:
Show Report Report # 7
18018
3538
16621
3500
OA-Sand
5-Aug-2013
83000
91
SP36-W5 L1
Spy Island
ENI Petroluem
Paul Kalenuik
Andrew Buchanan
49
111406
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) =
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
344 303 41
349 10
411 343
No producible oil within these zones based upon gas and chromatograph data collected.
68
84119691
8400019240715
801 22
1047
779
79046 73609
70620345
916 438 478
913 845 68
483
1112 1086 26
465
695 36
1046 480
731
566
91713 87745 3968
78674
77102
99
359
57
56425
773 748 25
989 932
805 780
5637
82000
225
225
77
83000
97
180
6
973
19457
80585 3483
45 928
739
498 549
442 41
5437
74 391
133
11
133
7
54
80
Interpretation:
Show Report Report # 8
20345
3565
19240
3532
OA-Sand
11-Aug-2013
83000
153
SP36-W5 L1
Spy Island
ENI Petroluem
Jeremy Tiegs
Andrew Buchanan
51
73037
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
SP36-W5 & SP36-W5 L1
ENI Petroleum
MI Swaco
Doyon 15
AK-AM-0900577139
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
29-Jun 62'8.70 130 49 52 18/31/42 5.8 150/101/80/56/20/18 2/-2.0 .5/97.5 0.00 0.08 9.6 22.5 .01/.18 500 160 Clean Conductor
30-Jun 784'9.00 76 24 27 17/46/55 5.0 75/51/42/32/17/15 2/-3.8 1/95.25 0.15 0.08 9.4 21.0 .02/.21 2100 160 Drill 16" Surface
1-Jul 2870'9.40 89 30 33 17/48/66 5.4 93/63/51/37/18/16 2/-5.0 1/94 0.10 0.10 9.5 23.5 .05/.28 1500 60 Drill 16" Surface
2-Jul 3484'9.40 92 29 37 25/53/67 5.5 95/66/54/41/20/18 2/-5.0 1/94 0.10 0.20 9.6 22.5 .09/.22 950 120 R/U Casing
3-Jul 3484'9.30 44 23 12 10/11/13 -58/35/27/17/5/4 -----8.0 ----Cement Surface
4-Jul 3484'9.10 35 22 9 7/8/10 -53/31/23/13/4/3 -----8.3 ----P/U 5" DP
5-Jul 3484'9.30 50 9 20 10/11/14 6.4 38/29/25/19/13/9 1/-4.0 2/94 -0.22 9.7 -.10/1.00 300 280 RIH
6-Jul 4150'9.30 49 10 26 10/14/15 6.2 46/36/31/24/12/10 1/-4.0 2/94 0.15 0.15 9.9 2.5 .10/1.10 700 160 Drill 12.25" Intermediate
7-Jul 7320'9.30 59 15 35 19/30/35 5.0 65/50/43/34/15/12 1/-5.5 2/93 0.10 0.14 9.7 17.5 .05/.90 1400 100 Drill 12.25" Intermediate
8-Jul 9295'9.30 51 12 27 17/28/36 5.3 51/39/33/26/14/12 1/-5.0 2/93 0.10 0.15 9.5 17.5 .06/.90 1700 100 Drill 12.25" Intermediate
9-Jul 9599'9.35 62 16 32 16/36/55 5.1 64/46/41/33/17/15 1/-6.0 2/92 0.10 0.10 9.6 22.5 .07/.90 1700 100 BROOH
10-Jul 9599'9.20 56 17 26 18/35/48 5.3 60/43/36/28/15/13 1/-6.0 2/92 0.10 0.10 9.6 22.5 .05/1.00 1450 120 RIH BHA #4
11-Jul 11679'9.50 62 18 32 23/44/59 5.2 68/50/42/33/18/16 1/-8.0 2/90 0.10 0.10 9.5 22.5 .04/.90 1600 100 Drill 12.25" Intermediate
12-Jul 12405'9.45 52 13 25 23/47/65 5.2 51/35/33/26/14/12 1/-8.0 2/90 0.15 0.15 9.6 23.0 .06/.90 1400 100 BROOH
13-Jul 12405'9.40 49 12 25 18/36/53 5.2 49/37/31/24/14/12 1/-8.0 2/90 0.10 0.20 9.7 21.0 .07/.80 1100 100 R/U Casing
14-Jul 12405'9.50 64 16 23 13/30/51 5.0 55/39/34/26/13/11 1/-8.0 2/90 0.10 0.10 9.5 20.0 .05/.80 1100 100 Fill 9-5/8" Csg
15-Jul 12405'9.40 44 10 14 6/8/13 5.3 34/24/21/14/6/4 1/-7.5 2/91 0.10 0.08 9.1 15.0 .02/1.20 900 100 Prep csg cut
16-Jul 12405'9.40 49 12 25 18/36/53 5.2 49/37/31/24/14/12 1/-8.0 2/90 0.10 0.02 9.7 21.0 .07/.80 1100 100 R/U Casing
17-Jul 12405'9.30 50 9 18 6/6/7 -36/27/22/17/7/5 ----------Displace to OBM
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG
18-Jul 13419 9.35 47 16 14 6/7/7 3.2 46/30/24/17/7/6 -/2 6.62 65/35 2.75 3.58 519 35.01 -17.34/46.19 -Drill 8.75" Production
19-Jul 15913 9.3 46 15 17 6/7/7 3.2 47/32/25/18/7/6 -/1 7.17 66/34 2.2 2.86 783 32.19 -30.73/37.1 -Drill 8.75" Production
20-Jul 18250 9.3 47 16 16 7/7/8 3.0 48/32/26/18/7/6 -/1 6.92 66/34 3.1 4.03 996 32.83 -27.65/37.98 -Drill 8.75" Production
21-Jul 19651 9.3 45 16 15 7/7/8 3.2 47/31/25/18/7/6 -/1 7.14 67/33 3.2 4.16 1070 33.89 -19.29/47.17 -Drill 8.75" Production
22-Jul 21813 9.3 49 16 19 7/7/8 3.0 51/35/28/20/7/6 -/1 7.36 66/34 1.9 2.47 996 32.34 -38.28/30.89 -BROOH
23-Jul 21813 9.3 49 17 15 7/7/8 -49/32/25/18/7/6 -7.32 66/34 1.9 2.47 1050 31.46 -28.55/40.92 -BROOH
24-Jul 21813 9.3 50 17 15 7/7/8 -49/32/25/18/7/6 -7.32 66/34 2 2.6 1000 31.46 -31.28/37.98 -R/U 5.5" Liner Equipment
25-Jul 21813 9.3 50 15 16 7/7/8 -46/31/25/18/7/6 -7.37 66/34 2.4 3.12 850 31.22 -30.52/39.29 -Running in 5.5" Liner
26-Jul 21813 9.3 50 16 16 7/7/8 -48/32/26/18/7/6 -7.52 66/34 2.6 3.38 760 30.47 -30.88/40.37 -Repair Top Drive
27-Jul 21813 9.3 50 16 16 7/7/8 -48/32/25/18/7/6 -7.56 66/34 2.4 3.12 580 30.21 -31.15/40.56 -Prep Wireline Ops
28-Jul 21813 9.3 50 16 17 7/7/8 -49/33/26/18/7/6 -7.61 66/34 2.1 2.73 550 29.96 -28.12/44.31 -Circulate at 11502' MD
29-Jul 21813 9.3 50 16 17 7/7/8 -49/33/25/18/7/6 -7.66 66/34 2.2 2.86 480 29.7 -25.62/47.48 -BOP Testing
30-Jul 11480 9.25 50 15 17 6/7/7 -47/32/25/19/7/6 -6 64/36 3.25 4.23 325 31.72 -17.84/39.7 -Clean Surface Equipment
31-Jul 11480 9.25 49 15 15 6/7/7 -45/30/24/18/7/6 -6.01 64/36 3.00 3.9 370 31.72 -1.46/57.34 -Wash Down to 11480' MD
1-Aug 11617 9.25 50 16 16 7/8/8 4.0 48/32/26/19/7/6 -/1 6.0 64/36 3.00 3.90 365.0 31.5 -22.56/35.11 -Slip and Cut Drill Line
2-Aug 12465 9.20 50 16 18 7/8/8 4.0 50/34/28/20/8/7 -/1 6.5 66/34 3.30 4.29 400.0 32.8 -37.84/22.7 -Drill 8.75" L1 Hole
3-Aug 14959 9.20 46 14 19 8/8/8 4.0 47/33/27/20/8/7 -/1 7.4 66/34 2.60 3.38 550.0 29.2 -28.28/42.21 -Drill 8.75" L1 Hole
4-Aug 17507 9.20 47 15 19 8/9/9 3.7 49/34/28/21/8/8 -/1 7.1 67/33 2.70 3.51 660.0 30.6 -31.61/35.06 -Drill 8.75" L1 Hole
5-Aug 19396 9.2 46 13 21 8/9/9 3.7 47/34/28/21/8/7 -/1 7.01 68/32 2.90 3.77 735 31.31 -20.71/46.57 -Drill 8.75" L1 Hole
6-Aug 20870 9.15 47 14 21 9/9/9 3.8 49/35/30/23/9/9 -/1 7.08 61/39 3.00 3.9 770 31.05 -47.24/18.48 -BROOH
7-Aug 20870 9.2 46 14 18 7/8/8 3.8 46/32/27/20/8/8 -/1 7.11 69/31 2.80 3.64 750 31.55 -35.51/31.37 -BROOH
8-Aug 20870 9.2 45 14 18 7/8/8 -46/32/27/20/8/7 -7.11 69/31 2.70 3.51 745 31.55 -35.51/31.37 -POOH
9-Aug 20870 9.3 47 12 19 7/8/8 -43/31/26/19/8/7 -7.49 69/31 3.00 3.9 740 32.48 -21.7/50.04 -POOH
10-Aug 20870 9.3 47 12 20 7/8/8 -44/32/27/20/8/7 -7.44 69/31 3.10 4.03 750 32.74 -22.38/48.81 -Running in 5.5" Liner
11-Aug 20870 9.3 47 12 19 7/8/8 -43/31/26/19/8/7 -7.49 69/31 3.00 3.9 745 32.48 -21.7/50.04 -Prep for Displacement
Casing Record
Remarks
20" Conductor @ 160' MD, 160'TVD
13.375" Casing @ 3470' MD, 2450'TVD
9.625" Casing @ 12390' MD, 3507'TVD
WELL NAME:LOCATION:Spy Island
OPERATOR:AREA:North Slope
MUD CO:STATE:Alaska
RIG:SPUD:30-Jun-2013
SPERRY JOB:TD:6-Aug-2013
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
2 110 1 Smith XR+ 6C Mill tooth 16"160'3484'3324'23.40 1.117 142.3 25 50 2250 900 2-1-WT-M-1-I-SD-TD Surface TD
3 200 2 Smith MDI816LVEBPX PDC 12.25"3485'9600'6115'43.20 0.960 141.7 15 180 2380 900 8-8-RO-Sh-X-1-BT-ROP POOH due to low ROP
4 300 3 Hycalog SKHI716D-E8C PDC 12.25"9600'12405'2805'12.30 0.969 227.7 10 180 2850 900 1-1-CT-G-X-In-No-TD Intermediate TD
5 400 4 Smith MdSi616EBPX PDC 8.75"12405'21813 9768'62.80 0.902 149.9 18 150 3800 550 0-0-CT-T-X-In-No-TD Production
8 700 5 Smith XR+ Mill tooth 8.75"11480'11620'140'2.50 0.746 56.9 10 40 2200 500 0-0-WT-A-E-In-No-BHA Mill Window for L1
9 800 6 Smith MdSi616EBPX PDC 8.75"11620'20870'9250'55.80 0.902 165.8 10 160 3400 550 1-1-WT-A-X-In-CT-TD Production L1 TD
Alaska
RIG:Doyon 15 SPUD:30-Jun-2013
WELL NAME:SP36-W5 & SP36-W5 L1 LOCATION:Spy Island
OPERATOR:ENI Petroleum AREA:North Slope
MUD CO:
SPERRY JOB:AK-AM-0900577139 TD:6-Aug-2013
MI Swaco STATE:
B
i
t
R
e
c
o
r
d
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
500.00
29-Jun-2013
24:00:00
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
ConditionBit #
2.08.708.70
Size
160'
Tools
API FL
WOB
EVAMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Type
Spud Mud 5.8052
Depth in / out
YP
(lb/100ft2)
9.60
CementCht Silt
24 hr Max
Weight
Hours
Ss
(ppb Eq)
AK-AM-900480746
$2,810.00
$5,710.00
Clean conductor
PV
Footage
Keener/Amend/Buchanan
ShClyst TuffGvlCoal
cP
49
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
0'
0'
0'
Max @ ft Current
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.5130
MBT pH
Siltst
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
20"
Cly
*
24 hr Recap:Cont. R/U operations. R/U suitcases & test. P/U 5" DP. Perform 13-3/8" dummy hanger run. Rack back HWDP, jars
0
conductor @ 126'.
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
0Background
(max)
Trip
Average
0
000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
& NMDFC. Fill conductor & check for leaks. PSI test mud pumps. P/U conductor clean out BHA. Tag bottom @ 62'. Clean out
0
0 0'Minimum
Depth C-5n
0'
C-2
0
0
0
0
Units*
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
0
.
1 Smith XR+ 6C Milltooth 16" 1.117 160'
Cly
Set AtSize
178.9 X-65
Grade
20"
846
1352
Casing
Summary
Lithology (%)
MBT
1151'
pH
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
21.076
161.0
in
Time:
160'
1151'
991'
Max @ ft Current
472'335.5
Date:
Avg
to160'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
1498.4 Flow In (gpm)
Flow In (spm)
(current)
Keener/Amend/Buchanan
ShClyst TuffGvlCoal
cP
24
Footage
Ss
(ppb Eq)
AK-AM-
$2,810.00
$8,520.00
Drill Ahead 16" Hole
PV
24 hr Max
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.40Spud Mud 5.078427
Depth in / out
Mud Type
Lst
Type
9.44
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
SP Motor 1.83, GyroPulse, Telescope 825, ARC 825
API FL
WOB
EVAMAR160'
ConditionBit #
3.89.00
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
30-Jun-2013
24:00:00
Current Pump & Flow Data:
201
Max
Chlorides
mg/l
2100.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
2913
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
1396
545
Units*
0
0
0
0
C-5n
1056'
C-2
52
2 744'Minimum
Depth
to 405' MD. Drill ahead to 1151' MD as of midnight. Max gas observed was 52 units @ 1056' MD. No samples collected during
13
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
06Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
surface section.
0
Circ hole clean. POOH f/ 165' MD. P/U BHA #2 & shallow test tools. Drill ahead to 405' MD. BROOH to P/U BHA. RIH
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1500.00
1-Jul-2013
24:00:00
Current Pump & Flow Data:
1661
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.41
Doyon 15 Report For:
ConditionBit #
5.09.40
Size
160'
Tools
SP Motor 1.83, GyroPulse, Telescope 825, ARC 825
API FL
WOB
EVAMAR
9.649.96
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Type
Spud Mud 5.42870'33
Depth in / out
YP
(lb/100ft2)
9.50
CementCht Silt
24 hr Max
Weight
Hours
Ss
(ppb Eq)
AK-AM-
$2,810.00
$11,330.00
Drill Ahead 16" Hole
PV
Footage
Keener/Amend/Buchanan
ShClyst TuffGvlCoal
cP
30
(current)
Avg
to1151'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
2408.9 Flow In (gpm)
Flow In (spm)
1151'
3110'
1959'
Max @ ft Current
3018'223.5
Date:
Time:
in
186.7 SPP (psi)
Gallons/stroke
TFABit Type
Depth
23.589
MBT
3110'
pH
Siltst
816
193
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
20"
Cly
1 Smith XR+ 6C Milltooth 16" 1.117 160'
*
24 hr Recap:Drill ahead f/ 1151' MD to 3110' MD. Max gas observed the past 24 hrs was 1455 units @ 2238' MD. No samples
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
57Background
(max)
Trip
Average
0
000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
collected during surface section.
181
3 1615'Minimum
Depth C-5n
2238'
C-2
1455
0
0
0
Units*
02212
292
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
11670
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
Cly
Set AtSize
178.9 X-65
Grade
20"Casing
Summary
Lithology (%)
MBT
3484'
pH
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.592
in
Time:
3110'
3484'
374'
Max @ ft Current
3464'134.8
Date:
Avg
to3110'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
595.3 Flow In (gpm)
Flow In (spm)
(current)
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
29
Footage
3484' 3324'
Ss
(ppb Eq)
AK-AM-
$2,810.00
$14,140.00
R/U to run csg
PV
24 hr Max
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.60Spud Mud 5.53484'37
Depth in / out
Mud Type
Lst
Type
9.679.89
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
SP Motor 1.83, GyroPulse, Telescope 825, ARC 825
API FL
WOB
EVAMAR160'
ConditionBit #
5.09.40
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.09
Doyon 15 Report For:
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
2-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
Chlorides
mg/l
950.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
6040
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
4930
877
Units*
0
0
0
0
C-5n
3450'
C-2
94
14 3166'Minimum
Depth
and 886 units while BROOH. No samples collected during surface section.
52
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
886Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
0
Drill ahead f/ 3110' MD to 3484' MD. BROOH. L/D BHA #2. R/U for csg. Max gas observed was 94 units @ 3450' MD
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
3-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
ConditionBit #
9.30
Size
160'
Tools
API FL
WOB
EVAMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Type
Spud Mud3484'12
Depth in / out
YP
(lb/100ft2)
8.00
CementCht Silt
24 hr Max
Weight
Hours
Ss
(ppb Eq)
AK-AM-
$2,810.00
$16,950.00
Cement
PV
Footage
3484' 3324'
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
23
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
3484'
3484'
0'
Max @ ft Current
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
MBT pH
Siltst
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
20"
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:R/U csg equip. RIH to 315' MD & M/U shoe track. RIH 13-3/8" csg to 3470' MD. Circ & cond mud. Cement.
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
Background
(max)
Trip
Average
118
000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
Minimum
Depth C-5nC-2
0
0
0
Units*
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
0
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
Cly
Set AtSize
178.9 X-65
Grade
20"Casing
Summary
Lithology (%)
MBT pH
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
35
in
Time:
3484'
3484'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
(current)
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
22
Footage
3484' 3324'
Ss
(ppb Eq)
AK-AM-
$2,810.00
$19,760.00
P/U 5" DP
PV
24 hr Max
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.30Spud Mud3484'9
Depth in / out
Mud Type
Lst
Type
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
WOB
EVAMAR160'
ConditionBit #
9.10
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
4-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
Chlorides
mg/l
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
0
0
Units*
0
0
0
0
C-5nC-2
Minimum
Depth
5" DP.
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
0
Cont. cement. R/D cement equip & L/D landing jt. N/D diverter stack. N/U BOP stack. Set test plug & test BOP. P/U
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
300.00
5-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
ConditionBit #
2
4.0
12.25"Smith MDI816LVEBPX PDC
9.30
Size
3470'
160'
Tools
Xceed 900, TeleScope 825, ARC 825
API FL
3484'
WOB
EVAMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Type
Spud Mud 6.43484'20
Depth in / out
YP
(lb/100ft2)
9.70
CementCht Silt
24 hr Max
68.0
Weight
Hours
Ss
(ppb Eq)
AK-AM-
$2,810.00
$22,570.00
RIH
PV
Footage
3484' 3324'
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
9
(current)
Avg
to3484'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
3484'
3484'
0'
Max @ ft Current
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
50
L-80
MBT
3484'
pH
0.960
Siltst
13 3/8"
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
20"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Test BOP. Cont. P/U 5" DP. P/U BHA #3. RIH w/ BHA #3 and test tools. Cont. RIH.
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
Background
(max)
Trip
Average 000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
Minimum
Depth C-5nC-2
0
0
0
Units*
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
0
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
BTC
Cly
Set AtSize
178.9 X-65
Grade
20"
5
13 3/8"
850
201
Casing
Summary
Lithology (%)
L-80
MBT
4640'
pH
0.960
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.549
269.3
in
Time:
3484'
4640'
1156'
Max @ ft Current
3502'260.3
Date:
Avg
to3484'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
727.3 Flow In (gpm)
Flow In (spm)
(current)
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
10
Footage
3484' 3324'
Ss
(ppb Eq)
AK-AM-
$3,410.00
$25,980.00
Drill 12.25" Hole
PV
24 hr Max
68.0
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.90LSND6.24150'26
Depth in / out
Mud Type
Lst
95
Type
9.519.85
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 900, TeleScope 825, ARC 825
API FL
3484'
WOB
EVAMAR
3470'
160'
ConditionBit #
2
4.0
12.25"
9.30
Smith MDI816LVEBPX PDC
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.06
Doyon 15 Report For:
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
6-Jul-2013
24:00:00
Current Pump & Flow Data:
1561
Max
Chlorides
mg/l
700.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
38067
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
4443
32
Units*
0
0
0
0
C-5n
3713'
C-2
286
3 3485'Minimum
Depth
min. Drill shoe track & rat hole to 3484' MD. Drill 20' new hole to 3504' MD. Displace mud to LSND. Cut & slip drill line. Perform
41
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
15Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
mainly of sandstone with local silts.
LOT to 11.16 ppg EMW. Drill ahead from 3504' MD to 4640' MD. Max gas observed was 286 units @ 3713' MD. Cuttings consist
0
Cont. RIH to 3242' MD. Wash down to top of cmt plug @ 3382' MD & Circ B/U. Test 13-3/8" csg to 2500 psi for 30
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1400.00
7-Jul-2013
24:00:00
Current Pump & Flow Data:
2253
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.71
Doyon 15 Report For:
ConditionBit #
2
5.5
12.25"Smith MDI816LVEBPX PDC
9.30
Size
3470'
160'
Tools
Xceed 900, TeleScope 825, ARC 825
API FL
3484'
WOB
EVAMAR
9.9810.33
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
95
Type
LSND 5.07320'35
Depth in / out
YP
(lb/100ft2)
9.70
CementCht Silt
24 hr Max
68.0
Weight
Hours
Ss
(ppb Eq)
AK-AM-
$3,410.00
$29,390.00
Drill 12.25" Hole
PV
Footage
3484' 3324'
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
15
(current)
Avg
to4640'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
666.6 Flow In (gpm)
Flow In (spm)
4640'
7910'
3270'
Max @ ft Current
4963'275.2
Date:
Time:
in
227.7 SPP (psi)
Gallons/stroke
TFABit Type
Depth
17.559
L-80
MBT
7910'
pH
0.960
Siltst
13 3/8"
901
213
Casing
Summary
Lithology (%)
5
Set AtSize
178.9 X-65
Grade
20"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Drill ahead f/ 4640' MD to 7910' MD as of midnight. Max gas observed the past 24 hrs was 117 units @ 4994' MD.
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
4Background
(max)
Trip
Average 000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
Cuttings have consisted of mostly sandstone with local silts and some coal ctgs around 4900' MD - 5000' MD.
12
2 6425'Minimum
Depth C-5n
4994'
C-2
117
0
0
0
Units*
01242
10
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
14666
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
BTC
Cly
Set AtSize
178.9 X-65
Grade
20"
13 3/8"
905
214
Casing
Summary
Lithology (%)
L-80
MBT
9400'
pH
0.960
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
17.551
227.7
in
Time:
7910'
9400'
1490'
Max @ ft Current
4963'209.6
Date:
Avg
to7910'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
408.7 Flow In (gpm)
Flow In (spm)
(current)
Perry/Amend/Buchanan
ShClyst TuffGvlCoal
cP
12
Footage
3484' 3324'
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$32,800.00
Drill 12.25" Hole
PV
24 hr Max
68.0
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.50LSND5.39295'27
Depth in / out
Mud Type
Lst
100
Type
10.1110.37
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 900, TeleScope 825, ARC 825
API FL
3484'
WOB
EVAMAR
3470'
160'
ConditionBit #
2
5.0
12.25"
9.30
Smith MDI816LVEBPX PDC
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.68
Doyon 15 Report For:
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
8-Jul-2013
24:00:00
Current Pump & Flow Data:
2433
Max
Chlorides
mg/l
1700.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
4504
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
424
21
Units*
0
0
0
0
C-5n
8815'
C-2
41
2 9277'Minimum
Depth
sandstone.
8
Gas Summary
0
0 0
C-1 C-5i
5
C-3
00
C-4i C-4n
000Average
2Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
0
Drill ahead f/ 7910' MD to 9400' MD. Max gas observed was 41 units @ 9915' MD. Samples consist of mainly clean
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1700.00
9-Jul-2013
24:00:00
Current Pump & Flow Data:
1503
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.38
Doyon 15 Report For:
ConditionBit #
2
6.0
12.25"Smith MDI816LVEBPX PDC
9.35
Size
3470'
160'
Tools
Xceed 900, TeleScope 825, ARC 825
API FL
3484'
WOB
EVAMAR
10.0710.30
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
95
Type
LSND 5.19599'32
Depth in / out
YP
(lb/100ft2)
9.60
CementCht Silt
24 hr Max
68.0
Weight
Hours
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$36,210.00
BROOH
PV
Footage
3484' 3324'
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
16
(current)
Avg
to9400'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
269.4 Flow In (gpm)
Flow In (spm)
9400'
9599'
199'
Max @ ft Current
9513'104.6
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.562
L-80
MBT
9599'
pH
0.960
Siltst
13 3/8"
787
186
Casing
Summary
Lithology (%)
5
Set AtSize
178.9 X-65
Grade
20"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Drill ahead f/ 9400' MD to 9599' MD. BROOH due to low ROP. Max gas observed was 29 units @ 9404' MD. Samples
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
5Background
(max)
Trip
Average
19
000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
consisty of mainly clean sandstone. Metal shavings seen in cutting samples.
10
5 9599'Minimum
Depth C-5n
9404'
C-2
29
0
0
0
Units*
0746
326
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
2489
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
BTC
Cly
Set AtSize
178.9 X-65
Grade
20"
13 3/8"
207
48
Casing
Summary
Lithology (%)
L-80
MBT
9599'
pH
0.960
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.556
in
Time:
9599'
9599'
0'
Max @ ft Current
Date:
Avg
to9599'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
(current)
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
17
6115'
12.25" 0.969
Footage
43.20
3484' 3324'
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$39,620.00
RIH
PV
24 hr Max
68.0
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.60
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.3
9599'
9599'26
Depth in / out
Mud Type
Lst
Type
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 900, PowerPulse 825, ARC 825
API FL
15.03484' 3599'
WOB
EVAMAR
3
3470'
160'
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
6.0
12.25"Smith MDI816LVEBPX PDC
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
10-Jul-2013
24:00:00
Current Pump & Flow Data:
314
Max
Chlorides
mg/l
1450.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
0
0
Units*
0
0
0
0
C-5nC-2
Minimum
Depth
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
48Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
0
Cont. BROOH. L/D BHA #3. P/U BHA #4. RIH.
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1600.00
11-Jul-2013
24:00:00
Current Pump & Flow Data:
2597
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.96
Doyon 15 Report For:
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
8.0
12.25"Smith MDI816LVEBPX PDC
9.50
Size
3
3470'
160'
Tools
Xceed 900, PowerPulse 825, ARC 825
API FL
15.03484' 3599'
WOB
EVAMAR
10.0510.48
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
45
Type
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.2
9599'
11679'32
Depth in / out
YP
(lb/100ft2)
9.50
CementCht Silt
24 hr Max
68.0
Weight
Hours
5
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$43,030.00
Drill 12.25" Hole
PV
6115'
12.25" 0.969
Footage
43.20
3484' 3324'
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
18
(current)
Avg
to9599'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
383.1 Flow In (gpm)
Flow In (spm)
9599'
12015'
2416'
Max @ ft Current
9845'257.8
Date:
Time:
in
214.5 SPP (psi)
Gallons/stroke
TFABit Type
Depth
22.562
L-80
MBT
12015'
pH
0.960
Siltst
13 3/8"
854
202
Casing
Summary
Lithology (%)
50
Set AtSize
178.9 X-65
Grade
20"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Cont. wash & ream to 9599' MD. Drill ahead from 9599' MD to 12015' MD. Max gas observed the past 24 hours was
111
siltstone with some sand and 5-10% shale fragments from 11550' - 12000' MD.
100% Gas In Air=10,000 UnitsConnection
463
Chromatograph (ppm)
48Background
(max)
Trip
Average
8
082188
00
C-4i C-4n
119
C-3C-1 C-5i
Gas Summary
0
213 566
525 units @ 11361' MD. Samples consist of mainly clean sandstone with some silt from 9599' MD - 11500' MD and mainly
90
8 9679'Minimum
Depth C-5n
11361'
C-2
525
0
550
0
Units*
1347500
946
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
839
0
52325
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
BTC
Cly
Set AtSize
178.9 X-65
Grade
20"
80
13 3/8"
905
214
Casing
Summary
Lithology (%)
L-80
MBT
12405'
pH
0.960
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
23.052
in
Time:
12015'
12405'
390'
Max @ ft Current
12202'196.2
Date:
Avg
to12015'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
297.4 Flow In (gpm)
Flow In (spm)
(current)
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
13
6115'
12.25" 0.969
Footage
43.20
3484' 3324'
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$46,440.00
BROOH
PV
24 hr Max
68.0
Weight
Hours
10
CementCht Silt
YP
(lb/100ft2)
9.60
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.2
9599'
12405 25
Depth in / out
Mud Type
Lst
10
Type
10.7210.86
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 900, PowerPulse 825, ARC 825
API FL
15.03484' 3599'
WOB
EVAMAR
3
3470'
160'
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
8.0
12.25"Smith MDI816LVEBPX PDC
9.45
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
10.97
Doyon 15 Report For:
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
12-Jul-2013
24:00:00
Current Pump & Flow Data:
1990
Max
Chlorides
mg/l
1400.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
59
0
6617
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
3126
51
Units*
27
0
40
0
C-5n
12333'
C-2
70
3 12028'Minimum
Depth
Samples consist of mainly siltstone with some sand and shale.
38
Gas Summary
0
40 60
C-1 C-5i
31
C-3
00
C-4i C-4n
02445Average
8119Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
51
29
Drill ahead f/ 12015' MD to 12405' MD. Max gas observed was 70 units @ 12333' MD and 81 units while BROOH.
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1100.00
13-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
1-1-CT-G-X-In-No-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
8.0
12.25"Smith MDI816LVEBPX PDC
9.40
Size
3
3470'
160'
Tools
API FL
10
15.03484' 3599'
WOB
EVAMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Type
180
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.2
9599'
12405'25
12405'
Depth in / out
YP
(lb/100ft2)
9.70
CementCht Silt
24 hr Max
68.0
Weight
Hours
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$49,850.00
R/U Csg Equip
PV
6115'
12.25" 0.969
Footage
12.30 2806'
43.20
3484' 3324'
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
12
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
12405'
12405'
0'
Max @ ft Current
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
21.049
L-80
MBT pH
0.960
Siltst
13 3/8"
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
20"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Cont. BROOH. L/D BHA #4. Test rams. R/U csg equip.
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
Background
(max)
Trip
Average
26
000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
Minimum
Depth C-5nC-2
0
0
0
Units*
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
0
.
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
BTC
Cly
Set AtSize
178.9 X-65
Grade
L-8012390'
20"
9 5/8"
13 3/8"
Casing
Summary
Lithology (%)
L-80
MBT pH
0.960
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
20.064
in
Time:
12405'
12405'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
(current)
Perry/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
16
6115'
12.25" 0.969
Footage
12.30 2806'
43.20
3484' 3324'
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$53,260.00
Fill 9-5/8" Csg
PV
24 hr Max
68.0
Weight
Hours
CementCht Silt
YP
(lb/100ft2)
9.50
180
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.0
9599'
12405'23
12405'
Depth in / out
Mud Type
Lst
Hydril
Type
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
10
15.03484' 3599'
WOB
EVAMAR
3
3470'
160'
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
89 5
12.25"Smith MDI816LVEBPX PDC
9.50
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
1-1-CT-G-X-In-No-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
14-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
Chlorides
mg/l
1100.00
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
*
24 hr Recap:
(max)(current)
0
0
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
0
0
Units*
0
0
0
0
C-5nC-2
Minimum
Depth
equip. Fill csg.
Gas Summary
0
0 0
C-1 C-5i
0
C-3
00
C-4i C-4n
000Average
Background
(max)
Trip
Chromatograph (ppm)
100% Gas In Air=10,000 UnitsConnection
0
0
Cont R/U csg equip. M/U shoe track to 165' MD. RIH 9-5/8" csg. M/U landing jt & land csg @ 12390' MD. R/D csg
.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
900.00
15-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
1-1-CT-G-X-In-No-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Condition
8-8-RO-Sh-X-1-BT-ROP
Bit #
2
7.5
12.25"Smith MDI816LVEBPX PDC
9.40
Size
3
3470'
160'
Tools
API FL
10
15.03484' 3599'
WOB
EVAMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30minMud Type
Lst
Hydril
Type
180
180.0
Hycalog SKHI716D-E8C PDC
LSND 5.3
9599'
12405'14
12405'
Depth in / out
YP
(lb/100ft2)
9.10
CementCht Silt
24 hr Max
68.0
Weight
Hours
Ss
(ppb Eq)
AK-AM-0900577139
$3,410.00
$56,670.00
Prep csg cut
PV
6115'
12.25" 0.969
Footage
12.30 2806'
43.20
3484' 3324'
Keener/Wimmer/Buchanan
ShClyst TuffGvlCoal
cP
10
40.0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
12405'
12405'
0'
Max @ ft Current
Date:
Time:
in
SPP (psi)
Gallons/stroke
TFABit Type
Depth
15.044
L-80
MBT pH
0.960
Siltst
13 3/8"
Casing
Summary
Lithology (%)
Set AtSize
178.9 X-65
Grade
L-8012390'
20"
9 5/8"
BTC
Cly
25.0 50.0 2-1-WT-M-1-I-SD-TD1Smith XR+ 6C Milltooth 16" 1.117 23.40 160'
*
24 hr Recap:Cont. fill 9-5/8" csg. R/U cmt equip & cmt csg. R/D cmt equip.
0
100% Gas In Air=10,000 UnitsConnection
0
Chromatograph (ppm)
Background
(max)
Trip
Average 000
00
C-4i C-4n
0
C-3C-1 C-5i
Gas Summary
0
0 0
Minimum
Depth C-5nC-2
0
0
0
Units*
00
0
907-685-0772Unit Phone:
0
Leigh Ann Rasher
Maximum
Report By:Logging Engineers:Leigh Ann Rasher / Clifton Posey
(max)(current)
0
0
0
.
*
24 hr Recap:
2 Smith MDI816LVEBPX PDC 12.25 0.960 43.20 3484'
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-8012390'
20"
9 5/8"
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik / Clifton Posey
0
0
13 3/8"
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
0.960
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
15.044
C-5nC-2
in
Minimum
Depth
Time:
R/U and test BOPs at time of report.
12405'
12405'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
ShClyst TuffGvlCoal
12.30
3599' 6115'
Keener/Wimmer
cP
11
15.0
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900577139
$4,410.00
$61,080.00
Testing BOPs
PV
2806'
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.10
000
LSND 5.31240513
Depth in / out
Mud Type
Lst
Hydril
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Chromatograph (ppm)
109599' 12405'
WOB
EVAMAR
180
Footage
100% Gas In Air=10,000 UnitsConnection
0
3470'
160'
Condition
1-1-CT-G-X-IN-NO-TD
Bit #
3
7.5
12.25Hycalog SKH17-E8C PDC
9.40
Size
180.0 8-8-RO-SH-X-1-BT-ROP
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
ROP
ROP (ft/hr)
4.23 @
Mud Data
Tools
API FL
Depth
0
Chlorides
16-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
mg/l
900.00
N/U BOP equipment test packoff. Set test plug and test body. P/U 4.5" drill pipe. Cut and slip, service draw works.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%mg/l
Chlorides
17-Jul-2013
24:00:00
Current Pump & Flow Data:
Max
Depth
ROP
ROP (ft/hr)
4.23 @
Mud Data
Tools
API FL
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
ENI Petroleum
Spy Island
North Slope
Job No.:
Daily Charges:
Total Charges:
MWD Summary
0.96
Rig Activity:
Doyon 15 Report For:
12.25Hycalog SKH17-E8C PDC
9.30
Size
180.0 8-8-RO-SH-X-1-BT-ROP
0
3470'
160'
Condition
1-1-CT-G-X-IN-NO-TD
Bit #
3
to Faze Pro OBM.
Completed BOP test. P/U BHA #5 and 8.75" PDC bit. RIH to 1213' MD and shallow test. Continue to RIH. Ream in
Footage
100% Gas In Air=10,000 UnitsConnection
0
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
10
Background
(max)
Trip
Average
Mud Type
Lst
Hydril
Type
Chromatograph (ppm)
LSND12405 18
Depth in / out
9599' 12405'
WOB
EVAMAR
000
180
00
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0900577139
$3,410.00
$64,490.00
RIH
PV
12.30
3599' 6115'
Keener/Wimmer
cP
9
15.0
2806'
YP
(lb/100ft2)
ShClyst TuffGvlCoal
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
12405'
12405'
0'
Max @ ft Current
Date:
Time:
the hole at 40 rpm to 12188' MD. Wash and ream to 12281' MD. Casing test to 3000 psi for 30 minutes. Prep to displace LSND
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
15.050
L-80
MBT pH
0.960
0
0
0
Siltst
13 3/8"
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik / Clifton Posey
Set AtSize
178.9 X-65
Grade
L-8012390'
20"
9 5/8"
(max)(current)
BTC
0
0
Cly
0
2 Smith MDI816LVEBPX PDC 12.25 0.960 43.20 3484'
.
.
*
24 hr Recap:
3.58 6.6
Displace to Faze Pro OBM. Drill shoe track cement to shoe and 20 new feet of hole to 12425' MD. Drill 8.75"
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Clifton Posey
(max)(current)
BTC
Cly
L-80
40.0
Depth in / out
L-8012390'
Bit Type RPM
12405' 180
180.0
Unit Phone:
106
Paul Kalenuik
Set AtSize
178.9 X-65
Grade
0
0
C-2
Gas Summary
46110 154
400
0
343
149095
Gallons/stroke
0
1305
12509'Minimum
Depth
13 3/8"
Maximum
in
20
13455'
0
456 197
production hole with tappered drill string.
546
Date:
Time:
529
Alkal
Coal
0
12405'
13772'
1367
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
13175'321.0238.0
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
0.960
1647
6115'
12.25 0.960
Footage
Sh
AK-AM-0900577139
3410
67900
Drilling Ahead
PV
cP
68.0
Weight
Flow In (gpm)
432
Size Hours
7
Cement
C-1 C-5i
C-3
Chromatograph (ppm)
1312 1013
35158
C-4i C-4n
66
9599' 12.30 2806'
43.20
65/35
10
15.0
Lst
100
Hydril
(lb/100ft2)
9.35
Type
14
Hycalog SKH17-E8C PDC
Mud (lb/bbl)ml/30min
2.75
(max)
Average
Comments
49Background Trip 100% Gas In Air=10,000 UnitsConnection
1-1-CT-G-X-IN-NO-TD3
3470'
Condition
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
Smith MDI816LVEBPX PDC
TFA
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
13419
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
379.0
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
18-Jul-2013
24:00:00
Yesterday's Depth:
3065
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
3265
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
19-Jul-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
456.0
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
15931
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
Flow In (spm)
EVAMAR
3599'
WOB
Smith MDI816LVEBPX PDC
TFA
3470'
Condition
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'
1-1-CT-G-X-IN-NO-TD3
Trip 100% Gas In Air=10,000 UnitsConnection
Average
104Background
Mud (lb/bbl)ml/30min
2.20
(max)
Comments
(lb/100ft2)
9.30
Type
17
Hycalog SKH17-E8C PDC 2806'
43.20
66/34
10
15.0
Lst
100
Hydril
90294
C-4i C-4n
157
C-3
Chromatograph (ppm)
1477 1169
574
Size Hours
7
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3,410.00
$71,310.00
Drilling Ahead
PV
cP
68.0
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
0.960
1546
6115'
12.25 0.960
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
14052'113.0334.0
0
13772'
16137'
2365'
Lime
TuffGvl
C-5n
Date:
Time:
541
Alkal
Coal
671
14940'
0
626 302
Minimum
Depth
13 3/8"
Maximum
in
8
Gallons/stroke
0
57990 243
537
0
480
216811
32
C-2
Gas Summary
1989
907-685-0772Unit Phone:
169
Paul Kalenuik
Set AtSize
178.9 X-65
Grade
Depth in / out
L-8012390'
Bit Type RPM
12405' 180
180.0
9599' 12.30
(current)
BTC
Cly
L-80
40.0
0
2.86 78.2
Drill 8.75" production run to a depth of 16137' MD as of midnight.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Clifton Posey
(max)
.
.
*
24 hr Recap:
4.03 6.9
Drill 8.75" production run to a depth of 18629' MD as of midnight.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Clifton Posey
(max)
Cly
L-80
40.0
0
L-8012390'
Bit Type RPM
12405' 180
180.0
9599' 12.30
BTC
Set AtSize
178.9 X-65
Grade
Depth in / out
907-685-0772Unit Phone:
190
Paul Kalenuik
(current)
C-2
Gas Summary
1217
47309 274
564
0
567
127611
Gallons/stroke
0Minimum
Depth
13 3/8"
Maximum
in
17
18390'
0
694 331
27
582
Date:
Time:
550
Alkal
Coal
0
16137'
18629'
2492'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
17420'105.0301.0
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
0.960
1647
6115'
12.25 0.960
Footage
Sh
AK-AM-0900577139
$4,410.00
$75,720.00
Drilling Ahead
PV
cP
68.0
Weight
Flow In (gpm)
605
Size Hours
7
Cement
C-1 C-5i
Chromatograph (ppm)
1432 1287
115354
C-4i C-4n
194
10
15.0
Lst
100
Hydril
C-3
(lb/100ft2)
9.30
Type
16
Hycalog SKH17-E8C PDC
Mud (lb/bbl)ml/30min
3.10
(max)
Comments
Average
22Background Trip 100% Gas In Air=10,000 UnitsConnection
1-1-CT-G-X-IN-NO-TD3
3470'
Condition
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
Smith MDI816LVEBPX PDC
TFA
2806'
43.20
66/34
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
18250
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
450.0
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
20-Jul-2013
24:00:00
Yesterday's Depth:
3665
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
3
*
24 hr Recap:
Report By:
20"
9 5/8"
Logging Engineers:A.Paul kalenuik/ Clifton Posey
(max)(current)
BTC
Cly
L-80
40.0
Depth in / out
L-8012390'
Bit Type RPM
3599' 180.0
50.0
Unit Phone:
155
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
0
10
38
C-2
Gas Summary
41726 220
482
0
439
117390
Gallons/stroke
0
1095
Minimum
Depth
13 3/8"
Maximum
in
19
19130'
0
564 283
Drill 8.75" production run to a depth of 19,843''MD as of midnight. No issues to report. Monitoring well volumes and tracking gas.
569
Date:
Time:
546
Alkal
Coal
0
18629'
19843'
1214'
Lime
TuffGvl
C-5n
24 Hour Progress:
SPP (psi)
Max @ ft Current
19472'105.0345.0
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
1.117
1645
3324'
12.25"0.960
Footage
Sh
AK-AM-0900577139
$3,410.00
$79,130.00
Drilling Ahead
PV
cP
68.0
Weight
Flow In (gpm)
518
Size Hours
0
Cement
C-1 C-5i
C-3
Chromatograph (ppm)
1340 1045
91275
C-4i C-4n
158
3484' 43.20 6115'
23.40
37/33
15.0
25.0
Lst
90
Hydril
(lb/100ft2)
9.30
Type
15
Smith MDI816LVEBPX PDC
Mud (lb/bbl)ml/30min
4.163.20
(max)
Average
Comments
24Background Trip 100% Gas In Air=10,000 UnitsConnection
8-8-RO-Sh-X-1-BT-ROP2
3470'
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
160'EVAMAR
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
19651 7.1
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
437.0
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
07/21/2013
24:00:00
Yesterday's Depth:
3716
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
22-Jul-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
495.0
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 66/34
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
3
3470'
2806'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
59Background
Mud (lb/bbl)ml/30min
1.90
(max)
Comments
1-1-CT-G-X-IN-NO-TD
Condition
Lst
100
Hydril
C-3
40137
C-4i C-4n
90
7
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
313
Size Hours
1158 686
10
AK-AM-0900577139
$3,410.00
$82,540.00
BROOH
PV
cP (lb/100ft2)
Flow In (spm)
1649
6115'
12.25 0.960
Footage
19
TFA
43.20
ClystSsChtSiltSiltst Sh
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.960
9.30
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
19759'79.8
0
19843'
21813'
1970'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
402 221
27
back reaming were 12 barrles at the time of report. Encountered fault at 19980' MD. Well bore breathing observed.
357
Minimum
Depth
13 3/8"
Maximum
in
19
Gallons/stroke
0
123
386
0
186
C-2
Gas Summary
1036 11308219904'
907-685-0772Unit Phone:
98
Paul Kalenuik
(current)
21240
Set AtSize
178.9 X-65
Grade
Depth in / out
15.0
Type
Hycalog SKH17-E8C PDC
Smith MDI816LVEBPX PDC
Bit Type RPM
12405' 180
180.0
9599' 12.30
Cly
L-80
40.0
0
L-8012390'
BTC
2.70 7.4
Drill 8.75" hole to a TD of 21813' MD. Circulate bottoms up and then proceeded to BROOH to 21600' MD. Loss from
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Clifton Posey
(max)
.
.
3
*
24 hr Recap:
Report By:
20"
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
BTC
Cly
L-80
40.0
Depth in / out
L-8012390'
Bit Type RPM
3599' 180.0
50.0
Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
C-2
Gas Summary
Gallons/stroke
Minimum
Depth
13 3/8"
Maximum
in
BROOH from 21,813' MD to 11,729' MD.
Date:
Time:
550
Alkal
Coal
21813'
21813'
0'
Lime
TuffGvl
C-5n
24 Hour Progress:
SPP (psi)
Max @ ft Current
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
1.117
1749
3324'
12.25"0.960
Footage
Sh
AK-AM-0900577139
$3410.00
$85950.00
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Size Hours
Cement
C-1 C-5i
C-3
Chromatograph (ppm)
C-4i C-4n
3484' 43.20 6115'
23.40
66/34
15.0
25.0
Lst
100
Hydril
(lb/100ft2)
9.30
Type
15
Smith MDI816LVEBPX PDC
Mud (lb/bbl)ml/30min
2.471.90
(max)
Average
Comments
Background Trip 100% Gas In Air=10,000 UnitsConnection
8-8-RO-Sh-X-1-BT-ROP2
Well bore breathing observed.
3470'
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
160'EVAMAR
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 7.3
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
07/23/2013
24:00:00
Yesterday's Depth:
3680
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
.
.
3
*
24 hr Recap:
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
07/24/2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 7.3
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)
160'EVAMAR
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
8-8-RO-Sh-X-1-BT-ROP2
Cut & slip drill line.
3470'
100% Gas In Air=10,000 Units0Connection
Comments
0Background Trip (max)
Average
0
Mud (lb/bbl)ml/30min
2.602.00
Lst
100
Hydril
(lb/100ft2)
9.30
Type
15
Smith MDI816LVEBPX PDC 3484' 43.20 6115'
23.40
66/34
15.0
25.0
00
C-4i C-4n
0
C-3
Chromatograph (ppm)
0 0
0
Size Hours
0
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3410.00
$89,360.00
R/U 5.5" Liner Equip
PV
cP
68.0
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
1.117
1750
3324'
12.25"0.960
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
Date:
Time:
0
Alkal
Coal
BROOH f/12250' MD to 10662' at 514 gpm. No losses noted.
0
0
0'
0
0 00
0'Minimum
Depth
13 3/8"
Maximum
in
Gallons/stroke
0
0 0
0
0
0
0
0
0
C-2
Gas Summary
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
L-80
40.0
Depth in / out
L-8012390'
Bit Type RPM
3599' 180.0
50.0
Report By:
20"
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
BTC
Cly
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
25-Jul-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 66/34
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
3
3470'
2806'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
2.40
(max)
Comments
1-1-CT-G-X-IN-NO-TD
Condition
Lst
Hydril
C-3
Clyst
00
C-4i C-4n
0
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
10
AK-AM-0900577139
$3,410.00
$92,770.00
Run 5.5" Liner
PV
cP (lb/100ft2)
Flow In (spm)
1550
6115'
12.25 0.960
Footage
19
TFA
43.20
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.960
9.30
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
0 0
0Minimum
Depth
13 3/8"
Maximum
in
Gallons/stroke
0
0
0
0
0
C-2
Gas Summary
0
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
0
Set AtSize
178.9 X-65
Grade
Depth in / out
15.0
Type
Hycalog SKH17-E8C PDC
Smith MDI816LVEBPX PDC
Bit Type RPM
12405' 180
180.0
9599' 12.30
L-80
40.0
0
L-8012390'
BTC
3.12 7.4
Running in 5.5" liner before performing production casing operations. RIH with 5" DP to 12348' MD.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
3
*
24 hr Recap:
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
07/26/2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 7.5
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)
160'EVAMAR
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
8-8-RO-Sh-X-1-BT-ROP2
Liner top at 11503'. POH to 11310'. R/U & repair top drive.
3470'
100% Gas In Air=10,000 Units0Connection
Comments
0Background Trip (max)
Average
0
Mud (lb/bbl)ml/30min
3.382.60
Lst
100
Hydril
(lb/100ft2)
9.30
Type
16
Smith MDI816LVEBPX PDC 3484' 43.20 6115'
23.40
66/34
15.0
25.0
00
C-4i C-4n
0
C-3
Chromatograph (ppm)
0 0
0
Size Hours
0
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3,410.00
$96,180.00
Repairing Top Drive
PV
cP
68.0
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
1.117
1650
3324'
12.25"0.960
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
Date:
Time:
0
Alkal
Coal
RIH f/16925' to 17859'. Monitor top drive rotating link assembly leak. RIH to set 5.5" liner at 21130'.
0
0
0'
0
0 00
0'Minimum
Depth
13 3/8"
Maximum
in
Gallons/stroke
0
0 0
0
0
0
0
0
0
C-2
Gas Summary
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
L-80
40.0
Depth in / out
L-8012390'
Bit Type RPM
3599' 180.0
50.0
Report By:
20"
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
BTC
Cly
.
.
*
24 hr Recap:
3.12 7.6
Complete work on top drive. POOH. Perform rig maintenance. Lay down running tool. Cut and slip drill line.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
12405' 180
180.0
9599' 12.30
Set AtSize
178.9 X-65
Grade
Depth in / out
15.0
Type
Hycalog SKH17-E8C PDC
Smith MDI816LVEBPX PDC
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
0
C-2
Gas Summary
0
0
0
0
0
Gallons/stroke
0Minimum
Depth
13 3/8"
Maximum
in
0
0 0
0
PJSM rig up Halliburton wireline. Moisture related interferance with like and tools.
Date:
Time:
Oil / Water API FL Alkal
Coal
ECD
(ppg)
Tools
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.960
9.30
Ss Cht Silt Siltst ShCly
1650
6115'
12.25 0.960
Footage
16
TFA
43.20
AK-AM-0900577139
$3,410.00
$99,590.00
Prep Wireline ops
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
10
0
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i C-4n
0
Lst
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
2.40
(max)
Comments
1-1-CT-G-X-IN-NO-TD
Condition
Average
Background Trip 100% Gas In Air=10,000 UnitsConnection
3
3470'
2806'
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
66/34
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
27-Jul-2013
24:00:00
Yesterday's Depth:
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
3
*
24 hr Recap:
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
07/28/2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 7.6
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)
12390'Hydril
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
8-8-RO-Sh-X-1-BT-ROP2
report time. Currently POOH from clean out line.
RIH w/Baker bullnose, 2 junk baskets, magnet & mill to 9862'. RIH. Tag TOL at 11503'. At 11502', circ at 10 bpm & 1240 psi at
f/CCL. L/D, R/D & changeout wireline units.
21813'
100% Gas In Air=10,000 Units0Connection
Comments
0Background Trip (max)
Average
0
Mud (lb/bbl)ml/30min
2.732.10
Lst
100
(lb/100ft2)
9.30
Type
17
Smith MDI816LVEBPX PDC 3484' 43.20 6115'
23.40
66/34
15.0
25.0
00
C-4i C-4n
0
C-3
Chromatograph (ppm)
0 0
0
Size Hours
0
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3,410.00
$103,000.00
POOH
PV
cP
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
1.117
1650
3324'
12.25"0.960
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
Date:
Time:
0
Alkal
Coal
PJSM. R/U wireline equip. RIH w/junk basket, CCL, 6.45" gauge ring & tractor to 6400'. Unable to reach TOL. POH. Metal shavings
0
Estimated Kick-off Point at 11,423 MD.
0
0'
0
0 00
0'Minimum
Depth
5.5"
Maximum
in
Gallons/stroke
0
0 0
0
0
0
0
0
0
C-2
Gas Summary
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
40.0 L-80
Grade
Depth in / outBit Type RPM
3599' 180.0
50.0
Report By:
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
Cly
.
.
3
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
Cly
Depth in / outBit Type RPM
3599' 180.0
50.0
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
40.0 L-80
Grade
0
0
C-2
Gas Summary
0 0
0
0
0
0
Gallons/stroke
0
0
0'Minimum
Depth
5.5"
Maximum
in
0
0'
0
0 0
Monitor well. Static. POH to 9862' Pumped 20 bbl 10.9 lb/gal dry job. POH. L/D Baker tools.
0
Date:
Time:
0
Alkal
Coal
0
21813'
21813'
0'
Lime
TuffGvl
C-5n
24 Hour Progress:
SPP (psi)
Max @ ft Current
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
1.117
1650
3324'
12.25"0.960
Footage
Sh
AK-AM-0900577139
$3,410.00
$106,410.00
Testing BOP
PV
cP
Weight
Flow In (gpm)
0
Size Hours
0
Cement
C-1 C-5i
C-3
Chromatograph (ppm)
0 0
00
C-4i C-4n
0
3484' 43.20 6115'
23.40
66/34
15.0
25.0
Lst
100
(lb/100ft2)
9.30
Type
17
Smith MDI816LVEBPX PDC
0
Mud (lb/bbl)ml/30min
2.862.20
(max)
Average
Comments
0Background Trip 100% Gas In Air=10,000 Units0Connection
8-8-RO-Sh-X-1-BT-ROP2
Clean rig floor. Drain stack and pull wear ring. Rig up and Test BOP's.
Metal shavings on magnet. Boot baskets:empty.
21813'
Condition
2-1-WT-M-1-I-SD-TD
Bit #
1 16"160'
12390'Hydril
3484'
WOB
Smith XR+ 6C Milltooth
TFA
Hycalog SKHI716D-E8C PDC 12.25"
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
21813 7.7
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
07/29/2013
24:00:00
Yesterday's Depth:
ROP
ROP (ft/hr)
Keener/Wimmer/Buchanan
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
180 1-1-CT-G-X-In-No-TD0.969 12.30 9599' 12405' 2806'10
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
30-Jul-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
11480 64/36
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
8-8-RO-SH-X-1-BT-ROP
Bit #
2 12.25 3484'
160'EVAMAR
3599'
WOB
3
3470'
2806'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.25
(max)
Comments
1-1-CT-G-X-IN-NO-TD
Condition
Lst
Hydril
C-3
Clyst
00
C-4i C-4n
0
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
5
Size Hours
20 8
10
AK-AM-0900577139
$3,410.00
$109,820.00
Displacing Mud
PV
cP (lb/100ft2)
Flow In (spm)
1550
6115'
12.25 0.960
Footage
17
TFA
43.20
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.960
9.25
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
11482'
11482'
0'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
2 0
25
17
11456'Minimum
Depth
13 3/8"
Maximum
in
13
Gallons/stroke
0
1
6
0
1
C-2
Gas Summary
30 205611472'
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
612
Set AtSize
178.9 X-65
Grade
Depth in / out
15.0
Type
Hycalog SKH17-E8C PDC
Smith MDI816LVEBPX PDC
Bit Type RPM
12405' 180
180.0
9599' 12.30
L-80
40.0
5
L-8012390'
BTC
4.23 6.0
RIH with whipstock mill. Set whipstock and mill window. Displace mud and perform top drive maintenance.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
*
24 hr Recap:
3.90 6.0
Clean surface equipment after displacement. Worked on top drive. Monitored well with trip tank. POOH. Laid down
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
L-80
40.0
1
L-8012390'
BTC
Bit Type RPM
Set AtSize
178.9 X-65
Grade
Depth in / out
Type
Smith XR+ Milltooth
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
1783
C-2
Gas Summary
25 233911485'
1
0
0
3
Gallons/stroke
011481'Minimum
Depth
13 3/8"
Maximum
in
3 0
0 0
392
mill BHA. Cleaned rig floor and flush stack. RIH with BHA #8. Shallow tested MWD at 1160' MD. RIH to 11431' MD. Drill ahead.
17
Date:
Time:
Oil / Water API FL
365
Alkal
Coal
ECD
(ppg)
Tools
0
11482'
11501'
19'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
117
SPP (psi)
Max @ ft Current
11501'49.832.4
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.25
Ss Cht Silt Siltst ShCly
1549
Footage
15
TFA
AK-AM-0900577139
$3,410.00
$3,410.00
Drilling Ahead
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
10
Size Hours
12 4
0
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i C-4n
0
Lst
100
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
3.00
(max)
Comments
Condition
Average
8Background Trip 100% Gas In Air=10,000 UnitsConnection
3470'
Bit #
5 8.75"11480'
160'EVAMAR
WOB
64/36
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
11480
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
94.7
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
31-Jul-2013
24:00:00
Yesterday's Depth:
1422
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Morning Report Report # 34
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
1-Aug-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
158.5
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
11617 64/36
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
6
3470'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.00
(max)
Comments
Condition
Lst
100
Hydril
C-3
Clyst
00
C-4i C-4n
0
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
15
Size Hours
39 12
AK-AM-0900577139
$3,410.00
$6,820.00
Cut and Slip
PV
cP (lb/100ft2)
Flow In (spm)
1650
19'
8.75"0.902
Footage
16
TFA
0.50
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.25
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
11619'33.1
0
11501'
11620'
119'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
2 0
41
Slip and cut drill line.
28
11501'Minimum
Depth
13 3/8"
Maximum
in
8
Gallons/stroke
0
3
8
0
5
C-2
Gas Summary
63 663211620'
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
2348
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
Bit Type RPM
37.0
11620'
L-80
40.0
0
L-8012390'
BTC
3.90 6.0
Drill from 11501' MD to 11620' MD. POOH and laid down BHA. Picked up new BHA and ran in the hole to 11254' MD
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
*
24 hr Recap:
4.29 6.5
Service Rig. Drill from 11620' MD to 12465' MD. Back ream out of the hole from 12465' MD to 11454' MD. Perform
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
37.0
11620'
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
907-685-0772Unit Phone:
59
Paul Kalenuik
(current)
8819
C-2
Gas Summary
805 9622312582'
19
259
0
51
Gallons/stroke
011620'Minimum
Depth
13 3/8"
Maximum
in
2 0
279 110
0
FIT. Run in the hole and drill ahead.
120
Date:
Time:
Oil / Water API FL
546
Alkal
Coal
ECD
(ppg)
Tools
0
11620'
12652'
1032'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
124
SPP (psi)
Max @ ft Current
12651'62.7182.7
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.20
Ss Cht Silt Siltst ShCly
1650
19'
8.75"0.902
Footage
18
TFA
0.50
AK-AM-0900577139
$3,410.00
$10,230.00
Drilling ahead
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
72
Size Hours
930 704
0
Cement
C-1 C-5i
Chromatograph (ppm)
320
C-4i C-4n
7
Lst
100
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
3.30
(max)
Comments
Condition
Average
Background Trip 100% Gas In Air=10,000 Units726Connection
6
3470'
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
66/34
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
12465
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
419.1
Morning Report Report # 35
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
2-Aug-2013
24:00:00
Yesterday's Depth:
3024
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
6
*
24 hr Recap:
1560.902 11620'1032'3
Density (ppg)
out (sec/qt)
Viscosity
3204
ROP
ROP (ft/hr)
Ross/Amend/Buchanan
24 hr Max
Morning Report Report # 36
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
08/03/2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
428.0
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
14959 7.4
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)
12390'Hydril
WOBTFA
Smith MDSi616EBPX PDC 8.75"
ConditionBit #
0-0-WT-A-E No-BHA5
Drilling ahead currently through the lateral.
100% Gas In Air=10,000 Units645Connection
Comments
20Background Trip (max)
Average
0
Mud (lb/bbl)ml/30min
3.382.60
Lst
100
(lb/100ft2)
9.20
Type
19
Smith XR+ Milltooth 11480' 0.50 19'
66/34
8
0401
C-4i C-4n
197
C-3
Chromatograph (ppm)
1572 1338
848
Size Hours
4
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3,410.00
$13,640.00
Drilling ahead
PV
cP
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
1446
8.75"0.746
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
24 Hour Progress:
130
SPP (psi)
Max @ ft Current
13448'121.60.0
0
12652'
15364'
2712'
Lime
TuffGvl
C-5n
Date:
Time:
550
Alkal
Coal
Drilling F/12652' T/15364'.
871
Samples have been sandstone with some siltstone rarely seen. Accessory minerals seen: glauconite, mica, and pyrite.
well srt, uncons, sli slty, tr glauc, r sh frag, r mic, r pyr, SHOW: brn stn, sli odor, 40% even dull yel fluor, dull lt yel-wh ct fluor, lt yl ct.
Some shell fragments have been seen. Typical sample : Sandstone : trnsl-trnsp-lt gy-wh-crm-gn-blk, m-vf gr, ang-sb ang,
16
15320'
0
685 3232145
12652'Minimum
Depth
Maximum
in
Gallons/stroke
4
82012 336
575
0
731
233195
0
96
C-2
Gas Summary
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
40.0 L-80
Grade
Depth in / outBit Type RPM
11620' 37
Report By:
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
Cly
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
3048
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Morning Report Report # 37
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
4-Aug-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
470.9
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
17507 67/33
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
6
3470'
Trip 100% Gas In Air=10,000 Units645Connection
Average
20Background
Mud (lb/bbl)ml/30min
2.70
(max)
Comments
Condition
Lst
100
Hydril
C-3
Clyst
0421
C-4i C-4n
228
7
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
793
Size Hours
1477 1175
AK-AM-0900577139
$3,410.00
$17,050.00
Drilling ahead
PV
cP (lb/100ft2)
Flow In (spm)
1547
19'
8.75"0.902
Footage
19
TFA
0.50
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.20
Current Depth
24 Hour Progress:
109
SPP (psi)
Max @ ft Current
17788'107.8
0
15364'
17789'
2425'
Lime
TuffGvl
C-5n
478
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
654 328
84
Accessory minerals seen: glauconite, mica, and pyrite. Some shell fragments have been seen.
737
15364'Minimum
Depth
13 3/8"
Maximum
in
18
Gallons/stroke
5
339
560
3
712
C-2
Gas Summary
1333 14235417724'
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
66629
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
Bit Type RPM
37.0
11620'
L-80
40.0
0
L-8012390'
BTC
3.51 7.1
Drill ahead from 15364' MD to 17789' MD. Samples have been sandstone and a decrease in accesory minerals.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
*
24 hr Recap:
3.77 7.0
Drill ahead from 17789' MD to 19636' MD. Samples have been sandstone and a decrease in accesory minerals.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
37.0
11620'
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
37365
C-2
Gas Summary
978 9912619562'
221
440
2
425
Gallons/stroke
317789'Minimum
Depth
13 3/8"
Maximum
in
17 0
522 270
50
Accessory minerals seen: glauconite, mica, and pyrite. Some shell fragments have been seen.
526
Date:
Time:
Oil / Water API FL
525
Alkal
Coal
ECD
(ppg)
Tools
0
17789'
19636'
1847'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
123
SPP (psi)
Max @ ft Current
19634'83.675.0
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.20
Ss Cht Silt Siltst ShCly
1346
19'
8.75"0.902
Footage
21
TFA
0.50
AK-AM-0900577139
$3,410.00
$20,460.00
Drilling ahead
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
475
Size Hours
1146 953
7
Cement
C-1 C-5i
Chromatograph (ppm)
0270
C-4i C-4n
162
Lst
100
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
2.90
(max)
Comments
Condition
Average
24Background Trip 100% Gas In Air=10,000 Units645Connection
6
3470'
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
68/32
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
19396
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
432.6
Morning Report Report # 38
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
5-Aug-2013
24:00:00
Yesterday's Depth:
3499
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
3149
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Morning Report Report # 39
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
6-Aug-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
420.6
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870 61/39
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
6
3470'
Trip 100% Gas In Air=10,000 Units296Connection
Average
Background
Mud (lb/bbl)ml/30min
3.00
(max)
Comments
Condition
Lst
100
Hydril
C-3
Clyst
0174
C-4i C-4n
116
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
343
Size Hours
1112 801
AK-AM-0900577139
$3,410.00
$23,870.00
BROOH
PV
cP (lb/100ft2)
Flow In (spm)
1447
19'
8.75"0.902
Footage
21
TFA
0.50
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.15
Current Depth
24 Hour Progress:
124
SPP (psi)
Max @ ft Current
20868'51.3
0
19636'
20870'
1234'
Lime
TuffGvl
C-5n
499
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
465 252
50
335
19545'Minimum
Depth
13 3/8"
Maximum
in
22
Gallons/stroke
0
150
415
0
231
C-2
Gas Summary
841 9171320869'
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
27366
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
Bit Type RPM
37.0
11620'
L-80
40.0
0
L-8012390'
BTC
3.90 7.1
Drill ahead from 19636' MD to 20870' MD TD. Begin back reaming out of the hole.
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
6
*
24 hr Recap:
1560.902 11620'1032'3
Density (ppg)
out (sec/qt)
Viscosity
2306
ROP
ROP (ft/hr)
Ross/Wimmer
24 hr Max
Morning Report Report # 40
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
08/07/2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
0.0
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870 7.1
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)
12390'Hydril
WOBTFA
Smith MDSi616EBPX PDC 8.75"
ConditionBit #
0-0-WT-A-E No-BHA5
100% Gas In Air=10,000 Units0Connection
Comments
0Background Trip (max)
Average
0
Mud (lb/bbl)ml/30min
3.642.80
Lst
100
(lb/100ft2)
9.20
Type
18
Smith XR+ Milltooth 11480' 0.50 19'
69/31
8
00
C-4i C-4n
0
C-3
Chromatograph (ppm)
0 0
0
Size Hours
7
Cement
C-1 C-5i
Sh
AK-AM-0900577139
$3,410.00
$27,280.00
BROOH
PV
cP
Weight
Flow In (gpm)
Siltst
Casing
Summary
Lithology (%)
1446
8.75"0.746
Footage
(current)
Units*
ClystSsChtSilt
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
24 Hour Progress:
121
SPP (psi)
Max @ ft Current
0.00.0
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Date:
Time:
494
Alkal
Coal
Currently BROOH F/ 20870' T/9994
0
0 0
0 00
Minimum
Depth
Maximum
in
Gallons/stroke
0
0 0
0
0
0
0
0
0
C-2
Gas Summary
Unit Phone:
0
A.Paul Kalenuik
Set AtSize
40.0 L-80
Grade
Depth in / outBit Type RPM
11620' 37
Report By:
9 5/8"
Logging Engineers:A.Paul kalenuik/ Kori Plowman
(max)(current)
Cly
.
.
*
24 hr Recap:
3.51 7.1
Back ream out of the hole to surface. TIH to retrieve whipstock. At 2883' MD pressure spikes were seen. Hole was
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
20870' 156
37.0
11620' 55.80
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
0
C-2
Gas Summary
0
0
0
0
0
Gallons/stroke
0Minimum
Depth
13 3/8"
Maximum
in
0
0 0
0
filled to try and free blockage but the attempts failed. Began POOH.
Date:
Time:
Oil / Water API FL Alkal
Coal
ECD
(ppg)
Tools
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.20
Ss Cht Silt Siltst ShCly
1445
19'
8.75"0.902
Footage
18
TFA
0.50
AK-AM-0900577139
$3,410.00
$30,390.00
POOH
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
3
0
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i C-4n
0
Lst
100
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
2.70
(max)
Comments
Condition
Average
Background Trip 100% Gas In Air=10,000 UnitsConnection
6
3470'
9250'
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
69/31
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 41
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
8-Aug-2013
24:00:00
Yesterday's Depth:
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Ross/Amend
24 hr Max
Morning Report Report # 42
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
9-Aug-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870 69/31
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
6
3470'
9250'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.00
(max)
Comments
Condition
Lst
Hydril
C-3
Clyst
00
C-4i C-4n
0
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
3
AK-AM-0900577139
$2,810.00
$33,200.00
POOH
PV
cP (lb/100ft2)
Flow In (spm)
1247
19'
8.75"0.902
Footage
19
TFA
0.50
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.30
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
0 0
0
MD. Began POOH with whipstock BHA.
Minimum
Depth
13 3/8"
Maximum
in
Gallons/stroke
0
0
0
0
0
C-2
Gas Summary
0
907-685-0772Unit Phone:
0
Paul Kalenuik
(current)
0
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
Bit Type RPM
20870' 156
37.0
11620' 55.80
L-80
40.0
0
L-8012390'
BTC
3.90 7.5
POOH to Insp tool and MWD. Debris found inside MWD. Laid down MWD. RIH the hole and tag hook slot at 11441'
Report By:
20"
9 5/8"
Logging Engineers:Paul Kalenuik / Kori Plowman
(max)
.
.
6
*
24 hr Recap:
Report By:
9 5/8"
Logging Engineers:Jeremy Tiegs/ Kori Plowman
(max)(current)
Cly
Depth in / outBit Type RPM
11620' 37
Unit Phone:
0
Jeremy Tiegs
Set AtSize
40.0 L-80
Grade
0
0
C-2
Gas Summary
0 0
0
0
0
0
Gallons/stroke
0
0
Minimum
Depth
Maximum
in
0 0
0 0
Con't POOH F/4849' T/BHA. L/D BHA.
0
Date:
Time:
0
Alkal
Coal
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
24 Hour Progress:
0
SPP (psi)
Max @ ft Current
0.00.0
Oil / Water
ECD
(ppg)
Tools
API FL
Depth
0'to0'
(current)
Units*
ClystSsChtSiltSiltst
Casing
Summary
Lithology (%)
1247
8.75"0.746
Footage
Sh
AK-AM-0900577139
$2,810.00
$36,010.00
Running In Liner
PV
cP
Weight
Flow In (gpm)
0
Size Hours
7
Cement
C-1 C-5i
C-3
Chromatograph (ppm)
0 0
00
C-4i C-4n
0
11480' 2.50 19'
69/31
8
Lst
100
(lb/100ft2)
9.30
Type
20
Smith XR+ Milltooth
0
Mud (lb/bbl)ml/30min
4.033.10
(max)
Average
Comments
0Background Trip 100% Gas In Air=10,000 Units0Connection
0-0-WT-A-E No-BHA5
Run 5.5" 15.5# L80 H521 slotted liner F/Surface T/6027'.
R/U Franks casing running equipment.
ConditionBit #
12390'Hydril
WOBTFA
Smith MDSi616EBPX PDC 8.75"
MWD Summary
0.96
%Mud Type
FazePro NA
Ratio
Mud Data
Depth
Flow In (spm)4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870 7.4
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
0.0
Morning Report Report # 43
Customer:
Well:
Area:
Location:
Rig:
SP36-W5L1
08/10/2013
24:00:00
Yesterday's Depth:
0
ROP
ROP (ft/hr)
Ross/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
1560.902 55.80 11620'20870'9250'3
.
.
*
24 hr Recap:
3.90 7.5
Continued to run in the hole with 5.5" liner. Rig down running tool. Prepare for displacement.
Report By:
20"
9 5/8"
Logging Engineers:Jeremy Tiegs / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
20870' 156
37.0
11620' 55.80
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
907-685-0772Unit Phone:
0
Jeremy Tiegs
(current)
0
C-2
Gas Summary
0
0
0
0
0
Gallons/stroke
0Minimum
Depth
13 3/8"
Maximum
in
0
0 0
0
Date:
Time:
Oil / Water API FL Alkal
Coal
ECD
(ppg)
Tools
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.30
Ss Cht Silt Siltst ShCly
1247
19'
8.75"0.902
Footage
19
TFA
0.50
AK-AM-0900577139
$2,810.00
$38,820.00
Prepare to Displace Mud
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
3
0
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i C-4n
0
Lst
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
3.00
(max)
Comments
Condition
Average
Background Trip 100% Gas In Air=10,000 UnitsConnection
6
3470'
9250'
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
69/31
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 44
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
11-Aug-2013
24:00:00
Yesterday's Depth:
ROP
ROP (ft/hr)
Ross/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
ROP
ROP (ft/hr)
Ross/Wimmer
24 hr Max
Morning Report Report # 45
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
12-Aug-2013
24:00:00
Yesterday's Depth:ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Cor Solids
Avg Min
YP
Max
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
6
3470'
9250'
Trip 100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
(max)
Comments
Condition
Lst
Hydril
C-3
Clyst
00
C-4i C-4n
0
0
Cement
C-1 C-5i
Chromatograph (ppm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
3
AK-AM-0900577139
$2,810.00
$41,630.00
Testing BOPs
PV
cP (lb/100ft2)
Flow In (spm)
27
19'
8.75"0.902
FootageTFA
0.50
Ss Cht Silt Siltst ShCly
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.15
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Alkal
Coal
ECD
(ppg)
Tools
Date:
Time:
Oil / Water API FL
0
0 0
0
install test plug. Rig up to test BOPs. Begin testing BOPs.
Minimum
Depth
13 3/8"
Maximum
in
Gallons/stroke
0
0
0
0
0
C-2
Gas Summary
0
907-685-0772Unit Phone:
0
Jeremy Tiegs
(current)
0
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
Bit Type RPM
20870' 156
37.0
11620' 55.80
L-80
40.0
0
L-8012390'
BTC
Displace OBM. Slip and cut drill line. Clean surface equipment. POOH and lay down running tool. Pull W/R and
Report By:
20"
9 5/8"
Logging Engineers:Jeremy Tiegs / Kori Plowman
(max)
.
.
*
24 hr Recap:
connection to 5000 psi.
Completed BOP test. Rig up completion equipment. RIH with lower completeiong tbg to bottom of jt #1. Test
Report By:
20"
9 5/8"
Logging Engineers:Jeremy Tiegs / Kori Plowman
(max)
L-80
40.0
0
L-8012390'
BTC
Bit Type RPM
20870' 156
37.0
11620' 55.80
Set AtSize
178.9 X-65
Grade
Depth in / out
8.0
Type
Smith MDSI616EBPX PDC
Smith XR+ Milltooth
907-685-0772Unit Phone:
0
Jeremy Tiegs
(current)
0
C-2
Gas Summary
0
0
0
0
0
Gallons/stroke
0Minimum
Depth
13 3/8"
Maximum
in
0
0 0
0
Date:
Time:
Oil / Water API FL Alkal
Coal
ECD
(ppg)
Tools
0
20870'
20870'
0'
Lime
TuffGvl
C-5n
Current Depth
24 Hour Progress:
SPP (psi)
Max @ ft Current
Depth
0'to0'
(current)
Units*
Casing
Summary
Lithology (%)
0.746
9.15
Ss Cht Silt Siltst ShCly
27
19'
8.75"0.902
FootageTFA
0.50
AK-AM-0900577139
$2,810.00
$44,440.00
Test 4.5" Tbg Conn
PV
cP (lb/100ft2)
Flow In (spm)
68.0
Weight
Flow In (gpm)
0
Size Hours
0 0
3
0
Cement
C-1 C-5i
Chromatograph (ppm)
00
C-4i C-4n
0
Lst
Hydril
C-3
Clyst
Mud (lb/bbl)ml/30min
(max)
Comments
Condition
Average
Background Trip 100% Gas In Air=10,000 UnitsConnection
6
3470'
9250'
0-0WT-A-E-NO-BHA
Bit #
5 8.75"11480'
160'EVAMAR
11620'
WOB
MWD Summary
0.96
%Mud Type
FazePro
Ratio
Mud Data
Depth
4.23 @
Current Pump & Flow Data:
Doyon 15 Report For:
20870
Cor Solids
Avg Min
YP
Max
ENI Petroleum
SPY ISLAND
North Slope
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Avg
Morning Report Report # 46
Customer:
Well:
Area:
Location:
Rig:
SP36-W5
13-Aug-2013
24:00:00
Yesterday's Depth:
ROP
ROP (ft/hr)
Keener/Wimmer
24 hr Max
Density (ppg)
out (sec/qt)
Viscosity
WELL INFORMATION
Customer :Eni Petroleum
Well Name :SP36-W5
Job Number :AK-XX-0900577139
Rig Name :Doyon 15
Field Name :Nikaitchuq
Country :USA
Survey Report
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00
40.57 0.00 0.00 40.57 0.00 N 0.00 E 0.00 0.00
79.86 0.60 288.64 79.86 0.07 N 0.19 W 0.07 1.53
119.60 0.68 279.83 119.60 0.17 N 0.62 W 0.17 0.32
124.31 0.86 277.26 124.31 0.18 N 0.69 W 0.18 3.89
133.21 0.78 273.99 133.21 0.19 N 0.81 W 0.19 1.04
143.13 0.61 266.62 143.12 0.20 N 0.93 W 0.20 1.93
153.18 0.38 236.25 153.17 0.17 N 1.01 W 0.17 3.40
162.88 0.36 188.01 162.87 0.13 N 1.05 W 0.13 3.12
183.44 0.87 162.94 183.43 0.09 S 1.01 W -0.09 2.75
193.03 1.18 165.42 193.02 0.25 S 0.96 W -0.25 3.26
204.76 1.53 166.67 204.75 0.52 S 0.90 W -0.52 2.99
214.53 1.90 168.34 214.51 0.81 S 0.83 W -0.81 3.82
224.41 2.18 168.06 224.39 1.15 S 0.76 W -1.15 2.84
234.64 2.59 169.49 234.61 1.57 S 0.68 W -1.57 4.05
263.85 3.54 176.29 263.78 3.12 S 0.50 W -3.12 3.48
295.43 4.79 177.99 295.27 5.41 S 0.39 W -5.41 3.98
326.22 5.44 187.18 325.94 8.14 S 0.53 W -8.14 3.39
358.64 5.43 192.89 358.21 11.16 S 1.06 W -11.16 1.67
388.02 6.01 197.03 387.45 13.99 S 1.82 W -13.99 2.42
449.10 7.91 198.98 448.08 21.02 S 4.13 W -21.02 3.13
541.98 11.58 201.63 539.60 35.73 S 9.64 W -35.73 3.98
634.91 13.57 201.81 630.30 54.53 S 17.13 W -54.53 2.14
728.11 17.88 200.32 719.99 78.11 S 26.17 W -78.11 4.64
821.36 21.90 198.81 807.66 108.01 S 36.75 W -108.01 4.35
914.91 25.48 197.54 893.31 143.72 S 48.44 W -143.72 3.87
972.32 27.29 196.58 944.74 168.11 S 55.92 W -168.11 3.24
1065.55 29.68 194.53 1,026.68 210.94 S 67.81 W -210.94 2.77
1158.85 31.40 193.85 1,107.03 256.91 S 79.43 W -256.91 1.88
1252.22 31.22 192.03 1,186.81 304.19 S 90.29 W -304.19 1.03
1345.58 35.22 190.04 1,264.90 354.39 S 100.03 W -354.39 4.44
1439.01 38.27 191.59 1,339.76 409.27 S 110.55 W -409.27 3.41
INSITE V7.4.20 Page 1Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1532.27 36.51 192.89 1,413.85 464.61 S 122.54 W -464.61 2.07
1625.52 38.05 195.34 1,488.05 519.37 S 136.33 W -519.37 2.29
1718.81 42.61 197.53 1,559.15 577.25 S 153.46 W -577.25 5.12
1812.13 45.51 198.59 1,626.21 638.93 S 173.59 W -638.93 3.21
1905.60 44.58 198.23 1,692.25 701.69 S 194.48 W -701.69 1.03
1999.02 44.70 197.52 1,758.72 764.16 S 214.63 W -764.16 0.55
2093.12 50.09 197.35 1,822.40 830.22 S 235.37 W -830.22 5.73
2185.64 52.83 197.76 1,880.04 899.21 S 257.20 W -899.21 2.98
2279.09 54.21 198.94 1,935.60 970.52 S 280.86 W -970.52 1.79
2372.47 57.26 199.59 1,988.17 1,043.36 S 306.33 W -1043.36 3.32
2466.17 61.03 199.89 2,036.21 1,119.06 S 333.49 W -1119.06 4.03
2559.23 60.99 201.82 2,081.32 1,195.12 S 362.47 W -1195.12 1.81
2652.67 62.94 206.70 2,125.25 1,270.26 S 396.37 W -1270.26 5.06
2746.10 59.58 211.60 2,170.19 1,341.79 S 436.20 W -1341.79 5.84
2839.36 56.47 216.03 2,219.59 1,407.51 S 480.16 W -1407.51 5.23
2932.67 58.66 222.19 2,269.67 1,468.54 S 529.84 W -1468.54 6.04
3025.95 61.75 226.80 2,316.03 1,526.22 S 586.58 W -1526.22 5.42
3101.21 65.59 229.54 2,349.41 1,571.17 S 636.84 W -1571.17 6.06
3201.21 70.59 232.32 2,386.72 1,629.58 S 708.86 W -1629.59 5.63
3300.89 74.94 233.36 2,416.25 1,687.07 S 784.72 W -1687.07 4.48
3400.09 79.25 234.14 2,438.40 1,744.23 S 862.68 W -1744.23 4.41
3500.12 81.46 236.18 2,455.16 1,800.55 S 943.62 W -1800.55 2.99
3568.13 82.92 235.35 2,464.40 1,838.46 S 999.32 W -1838.46 2.46
3661.52 83.26 234.57 2,475.64 1,891.69 S 1,075.23 W -1891.69 0.91
3754.95 82.98 232.80 2,486.83 1,946.62 S 1,149.97 W -1946.62 1.90
3848.27 82.73 231.87 2,498.44 2,003.20 S 1,223.26 W -2003.20 1.02
3941.53 83.14 230.67 2,509.91 2,061.10 S 1,295.46 W -2061.10 1.35
4034.87 83.14 230.19 2,521.06 2,120.14 S 1,366.90 W -2120.14 0.51
4128.26 82.84 229.03 2,532.46 2,180.20 S 1,437.49 W -2180.20 1.27
4221.78 82.64 228.38 2,544.27 2,241.42 S 1,507.19 W -2241.42 0.72
4315.17 82.33 224.61 2,556.49 2,305.15 S 1,574.34 W -2305.15 4.02
4408.56 83.03 228.36 2,568.40 2,368.91 S 1,641.50 W -2368.91 4.05
4501.98 83.14 227.96 2,579.64 2,430.78 S 1,710.59 W -2430.78 0.44
4595.41 83.07 227.55 2,590.86 2,493.13 S 1,779.26 W -2493.13 0.44
4688.75 82.89 228.16 2,602.27 2,555.30 S 1,847.94 W -2555.30 0.68
4782.11 83.02 228.50 2,613.72 2,616.90 S 1,917.16 W -2616.90 0.39
4875.57 82.98 228.35 2,625.11 2,678.45 S 1,986.55 W -2678.46 0.16
4969.02 83.23 228.47 2,636.33 2,740.04 S 2,055.94 W -2740.04 0.30
5062.44 82.97 228.63 2,647.55 2,801.43 S 2,125.45 W -2801.43 0.33
5155.83 83.16 229.06 2,658.83 2,862.44 S 2,195.25 W -2862.44 0.50
5249.27 83.26 229.11 2,669.87 2,923.21 S 2,265.37 W -2923.21 0.12
5342.98 82.75 229.00 2,681.29 2,984.16 S 2,335.63 W -2984.16 0.56
5436.09 83.49 229.61 2,692.44 3,044.44 S 2,405.71 W -3044.44 1.03
5529.50 82.75 229.92 2,703.63 3,104.34 S 2,476.51 W -3104.34 0.86
5622.89 83.11 229.47 2,715.12 3,164.29 S 2,547.18 W -3164.29 0.61
INSITE V7.4.20 Page 2Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
5716.30 83.22 229.48 2,726.24 3,224.55 S 2,617.68 W -3224.55 0.12
5809.69 83.19 228.93 2,737.29 3,285.14 S 2,687.89 W -3285.14 0.59
5903.05 82.88 229.55 2,748.61 3,345.64 S 2,758.08 W -3345.64 0.74
5996.51 83.05 229.59 2,760.06 3,405.80 S 2,828.69 W -3405.80 0.19
6089.93 81.99 229.46 2,772.22 3,465.92 S 2,899.14 W -3465.92 1.14
6183.28 82.21 229.79 2,785.05 3,525.82 S 2,969.59 W -3525.82 0.42
6276.69 82.27 230.00 2,797.66 3,585.44 S 3,040.38 W -3585.44 0.23
6370.12 81.99 230.65 2,810.46 3,644.53 S 3,111.61 W -3644.53 0.75
6463.54 82.10 231.08 2,823.38 3,702.92 S 3,183.37 W -3702.92 0.47
6556.97 81.87 231.70 2,836.41 3,760.65 S 3,255.67 W -3760.66 0.70
6650.37 82.12 231.68 2,849.42 3,817.99 S 3,328.24 W -3817.99 0.27
6743.79 82.17 232.56 2,862.19 3,874.81 S 3,401.29 W -3874.81 0.93
6837.25 82.50 233.41 2,874.65 3,930.57 S 3,475.24 W -3930.57 0.97
6930.75 82.72 233.74 2,886.68 3,985.63 S 3,549.85 W -3985.63 0.42
7024.07 82.24 234.09 2,898.89 4,040.12 S 3,624.62 W -4040.12 0.63
7117.46 82.66 233.68 2,911.16 4,094.69 S 3,699.41 W -4094.69 0.63
7210.85 82.40 233.98 2,923.30 4,149.34 S 3,774.16 W -4149.34 0.42
7304.31 82.43 233.82 2,935.64 4,203.92 S 3,849.01 W -4203.92 0.17
7397.70 82.56 233.41 2,947.84 4,258.85 S 3,923.55 W -4258.85 0.46
7491.12 82.52 233.38 2,959.97 4,314.08 S 3,997.91 W -4314.08 0.05
7584.50 82.49 232.60 2,972.15 4,369.81 S 4,071.84 W -4369.81 0.83
7677.93 82.56 233.01 2,984.30 4,425.81 S 4,145.63 W -4425.81 0.44
7771.52 82.49 232.22 2,996.48 4,482.15 S 4,219.36 W -4482.16 0.84
7864.88 82.46 231.75 3,008.70 4,539.16 S 4,292.28 W -4539.16 0.50
7958.35 82.59 231.07 3,020.86 4,596.96 S 4,364.72 W -4596.96 0.73
8051.72 82.49 231.02 3,032.99 4,655.17 S 4,436.72 W -4655.17 0.12
8145.13 83.35 231.28 3,044.50 4,713.32 S 4,508.91 W -4713.32 0.96
8238.46 82.72 231.20 3,055.82 4,771.31 S 4,581.15 W -4771.31 0.68
8330.13 83.14 230.93 3,067.10 4,828.48 S 4,651.91 W -4828.49 0.54
8425.04 83.07 230.57 3,078.49 4,888.10 S 4,724.88 W -4888.10 0.38
8518.40 83.01 230.67 3,089.81 4,946.90 S 4,796.51 W -4946.90 0.12
8611.85 83.07 230.49 3,101.13 5,005.80 S 4,868.17 W -5005.80 0.20
8705.13 83.07 230.21 3,112.39 5,064.89 S 4,939.46 W -5064.89 0.30
8798.41 83.07 231.87 3,123.64 5,123.11 S 5,011.46 W -5123.11 1.77
8891.79 82.80 230.29 3,135.13 5,181.33 S 5,083.56 W -5181.33 1.70
8985.19 82.80 229.73 3,146.83 5,240.88 S 5,154.56 W -5240.88 0.59
9078.75 83.20 229.05 3,158.24 5,301.32 S 5,225.05 W -5301.32 0.84
9172.15 82.03 229.62 3,170.24 5,361.68 S 5,295.31 W -5361.68 1.39
9265.52 82.67 228.78 3,182.67 5,422.14 S 5,365.36 W -5422.15 1.12
9358.72 82.64 229.13 3,194.59 5,482.84 S 5,435.07 W -5482.84 0.37
9451.97 82.78 228.76 3,206.42 5,543.59 S 5,504.82 W -5543.59 0.42
9545.52 83.44 228.70 3,217.64 5,604.85 S 5,574.63 W -5604.85 0.71
9636.18 82.29 232.47 3,228.91 5,661.96 S 5,644.11 W -5661.96 4.32
9729.41 80.99 234.87 3,242.46 5,716.60 S 5,718.41 W -5716.60 2.90
9822.71 81.55 238.04 3,256.63 5,767.56 S 5,795.26 W -5767.56 3.41
INSITE V7.4.20 Page 3Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
9916.08 81.10 242.17 3,270.72 5,813.55 S 5,875.26 W -5813.55 4.40
10009.44 81.19 245.33 3,285.09 5,854.35 S 5,957.99 W -5854.35 3.35
10102.87 81.57 248.78 3,299.10 5,890.35 S 6,043.04 W -5890.35 3.67
10196.13 82.23 253.20 3,312.25 5,920.41 S 6,130.31 W -5920.42 4.75
10289.38 82.29 258.43 3,324.81 5,943.05 S 6,219.86 W -5943.05 5.56
10382.67 82.62 264.37 3,337.07 5,956.87 S 6,311.26 W -5956.87 6.32
10475.99 82.81 269.65 3,348.91 5,961.70 S 6,403.67 W -5961.70 5.62
10569.46 83.19 272.14 3,360.31 5,960.25 S 6,496.42 W -5960.25 2.68
10662.88 83.65 274.19 3,371.01 5,955.12 S 6,589.08 W -5955.12 2.23
10756.15 84.17 276.01 3,380.91 5,946.88 S 6,681.45 W -5946.88 2.02
10849.50 84.50 278.22 3,390.13 5,935.37 S 6,773.63 W -5935.37 2.38
10942.95 84.39 279.69 3,399.17 5,920.89 S 6,865.50 W -5920.90 1.57
11036.33 84.52 281.66 3,408.20 5,903.68 S 6,956.83 W -5903.68 2.10
11129.75 84.20 283.99 3,417.38 5,883.04 S 7,047.47 W -5883.04 2.51
11223.09 84.50 286.52 3,426.57 5,858.61 S 7,137.08 W -5858.61 2.72
11316.53 84.42 288.41 3,435.59 5,830.70 S 7,225.79 W -5830.70 2.02
11409.96 84.56 290.05 3,444.56 5,800.07 S 7,313.60 W -5800.07 1.75
11503.22 83.99 292.51 3,453.87 5,766.39 S 7,400.06 W -5766.39 2.69
11596.53 84.21 295.46 3,463.46 5,728.67 S 7,484.85 W -5728.67 3.15
11689.81 84.97 299.04 3,472.26 5,686.15 S 7,567.39 W -5686.15 3.91
11783.12 85.67 302.88 3,479.87 5,638.32 S 7,647.13 W -5638.32 4.17
11876.47 86.26 306.53 3,486.45 5,585.31 S 7,723.66 W -5585.31 3.95
11969.81 87.10 309.90 3,491.85 5,527.67 S 7,796.87 W -5527.67 3.72
12063.22 87.81 313.30 3,496.00 5,465.73 S 7,866.64 W -5465.73 3.71
12156.59 88.43 315.81 3,499.06 5,400.26 S 7,933.13 W -5400.26 2.77
12249.97 88.42 317.83 3,501.63 5,332.19 S 7,997.00 W -5332.19 2.16
12343.33 87.14 316.03 3,505.25 5,264.05 S 8,060.70 W -5264.05 2.36
12360.33 86.71 315.37 3,506.16 5,251.90 S 8,072.56 W -5251.90 4.63
12458.17 87.32 314.16 3,511.26 5,183.10 S 8,141.93 W -5183.10 1.38
12494.47 87.00 312.50 3,513.05 5,158.22 S 8,168.30 W -5158.22 4.65
12587.86 87.32 310.68 3,517.68 5,096.30 S 8,238.06 W -5096.31 1.98
12681.04 84.76 310.43 3,524.12 5,035.87 S 8,308.68 W -5035.87 2.76
12774.50 86.94 310.11 3,530.88 4,975.62 S 8,379.80 W -4975.62 2.36
12867.84 86.40 309.15 3,536.30 4,916.19 S 8,451.57 W -4916.19 1.18
12961.16 87.83 308.94 3,541.00 4,857.48 S 8,523.95 W -4857.48 1.55
13054.46 88.63 309.46 3,543.88 4,798.54 S 8,596.22 W -4798.54 1.02
13147.82 90.12 310.22 3,544.90 4,738.73 S 8,667.90 W -4738.74 1.79
13241.20 91.08 311.11 3,543.92 4,677.89 S 8,738.72 W -4677.89 1.40
13334.59 90.70 311.69 3,542.47 4,616.14 S 8,808.77 W -4616.14 0.74
13428.02 90.59 311.72 3,541.42 4,553.98 S 8,878.52 W -4553.98 0.12
13521.34 90.77 311.64 3,540.31 4,491.93 S 8,948.21 W -4491.93 0.21
13614.60 89.61 310.48 3,540.00 4,430.68 S 9,018.53 W -4430.68 1.76
13707.94 91.25 310.35 3,539.30 4,370.17 S 9,089.59 W -4370.17 1.76
13801.33 92.56 311.02 3,536.20 4,309.32 S 9,160.36 W -4309.32 1.58
13895.95 92.80 310.92 3,531.77 4,247.35 S 9,231.73 W -4247.35 0.27
INSITE V7.4.20 Page 4Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
13988.24 91.78 311.40 3,528.08 4,186.66 S 9,301.16 W -4186.66 1.22
14081.63 91.42 311.02 3,525.48 4,125.16 S 9,371.39 W -4125.16 0.56
14174.44 91.11 311.48 3,523.43 4,063.98 S 9,441.15 W -4063.98 0.60
14268.48 90.79 311.49 3,521.87 4,001.69 S 9,511.58 W -4001.69 0.34
14361.82 90.60 311.71 3,520.74 3,939.72 S 9,581.38 W -3939.73 0.31
14455.18 91.11 312.35 3,519.34 3,877.23 S 9,650.72 W -3877.23 0.88
14548.64 90.43 312.46 3,518.09 3,814.21 S 9,719.72 W -3814.21 0.74
14642.09 90.52 311.58 3,517.31 3,751.65 S 9,789.14 W -3751.65 0.95
14735.51 91.29 312.10 3,515.84 3,689.35 S 9,858.73 W -3689.35 0.99
14828.90 89.48 310.83 3,515.21 3,627.51 S 9,928.71 W -3627.51 2.37
14922.34 89.01 311.22 3,516.44 3,566.19 S 9,999.20 W -3566.19 0.65
15015.71 88.84 311.41 3,518.19 3,504.55 S 10,069.31 W -3504.55 0.27
15109.16 90.25 311.65 3,518.94 3,442.60 S 10,139.27 W -3442.60 1.53
15202.57 89.28 311.89 3,519.32 3,380.38 S 10,208.93 W -3380.38 1.07
15295.96 87.42 310.87 3,522.01 3,318.67 S 10,278.98 W -3318.67 2.27
15389.37 86.94 310.37 3,526.60 3,257.93 S 10,349.79 W -3257.93 0.74
15482.76 88.48 311.74 3,530.33 3,196.64 S 10,420.15 W -3196.65 2.21
15576.12 89.96 312.33 3,531.61 3,134.14 S 10,489.49 W -3134.14 1.71
15669.58 90.58 312.23 3,531.17 3,071.27 S 10,558.63 W -3071.27 0.67
15763.00 90.41 312.11 3,530.36 3,008.55 S 10,627.87 W -3008.55 0.22
15856.38 90.89 312.36 3,529.30 2,945.79 S 10,697.00 W -2945.79 0.58
15949.76 90.85 312.64 3,527.88 2,882.71 S 10,765.84 W -2882.71 0.30
16043.19 90.80 312.12 3,526.54 2,819.74 S 10,834.85 W -2819.74 0.56
16136.61 90.40 312.56 3,525.56 2,756.82 S 10,903.90 W -2756.82 0.64
16230.04 89.96 311.28 3,525.26 2,694.41 S 10,973.42 W -2694.41 1.45
16323.44 89.73 310.42 3,525.52 2,633.31 S 11,044.07 W -2633.32 0.95
16416.86 89.93 311.26 3,525.79 2,572.22 S 11,114.74 W -2572.22 0.92
16510.32 90.16 311.43 3,525.72 2,510.49 S 11,184.91 W -2510.49 0.31
16603.82 90.34 311.87 3,525.31 2,448.35 S 11,254.77 W -2448.35 0.51
16697.14 91.35 311.92 3,523.94 2,386.04 S 11,324.23 W -2386.04 1.08
16790.53 91.79 312.03 3,521.38 2,323.60 S 11,393.63 W -2323.60 0.49
16883.92 92.50 312.13 3,517.88 2,261.06 S 11,462.90 W -2261.06 0.77
16977.38 92.31 311.82 3,513.96 2,198.61 S 11,532.32 W -2198.61 0.39
17070.77 91.08 311.76 3,511.20 2,136.40 S 11,601.92 W -2136.40 1.32
17164.19 88.59 311.23 3,511.47 2,074.51 S 11,671.88 W -2074.51 2.73
17257.57 89.80 311.03 3,512.78 2,013.10 S 11,742.21 W -2013.10 1.31
17351.00 90.41 311.15 3,512.61 1,951.69 S 11,812.63 W -1951.69 0.67
17444.59 90.47 310.71 3,511.89 1,890.38 S 11,883.33 W -1890.38 0.47
17537.95 87.46 310.88 3,513.58 1,829.40 S 11,953.99 W -1829.40 3.23
17631.42 85.26 309.84 3,519.51 1,768.99 S 12,025.06 W -1769.00 2.60
17724.79 86.90 310.12 3,525.89 1,709.14 S 12,096.44 W -1709.15 1.78
17818.20 89.91 310.77 3,528.49 1,648.58 S 12,167.49 W -1648.58 3.30
17911.53 90.21 311.42 3,528.39 1,587.23 S 12,237.83 W -1587.23 0.77
18004.86 90.97 311.64 3,527.43 1,525.36 S 12,307.69 W -1525.36 0.85
18098.11 89.37 310.47 3,527.16 1,464.12 S 12,378.00 W -1464.12 2.13
INSITE V7.4.20 Page 5Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
18191.47 87.66 309.99 3,529.58 1,403.84 S 12,449.25 W -1403.84 1.90
18284.92 87.97 309.79 3,533.14 1,343.95 S 12,520.90 W -1343.95 0.39
18378.20 88.12 310.23 3,536.32 1,284.02 S 12,592.31 W -1284.02 0.50
18471.48 87.66 310.78 3,539.76 1,223.47 S 12,663.18 W -1223.47 0.77
18564.86 87.98 310.90 3,543.31 1,162.45 S 12,733.78 W -1162.45 0.37
18658.26 87.60 310.59 3,546.91 1,101.53 S 12,804.49 W -1101.54 0.52
18751.82 87.12 310.30 3,551.22 1,040.91 S 12,875.61 W -1040.91 0.60
18845.22 86.36 310.74 3,556.53 980.32 S 12,946.50 W -980.32 0.94
18938.59 85.71 310.05 3,562.99 919.96 S 13,017.44 W -919.96 1.01
19031.79 87.07 310.39 3,568.85 859.90 S 13,088.46 W -859.90 1.50
19125.04 90.04 310.86 3,571.21 799.21 S 13,159.21 W -799.21 3.22
19218.59 89.85 309.91 3,571.30 738.60 S 13,230.46 W -738.60 1.04
19312.01 89.80 310.53 3,571.58 678.27 S 13,301.79 W -678.27 0.67
19405.24 90.50 312.31 3,571.34 616.60 S 13,371.70 W -616.60 2.05
19498.54 91.71 312.75 3,569.54 553.54 S 13,440.44 W -553.54 1.38
19591.91 87.80 311.88 3,569.94 490.70 S 13,509.47 W -490.70 4.29
19685.27 83.85 311.51 3,576.73 428.77 S 13,578.98 W -428.77 4.25
19778.70 87.45 311.47 3,583.82 367.07 S 13,648.76 W -367.07 3.85
19871.96 89.47 311.62 3,586.32 305.24 S 13,718.53 W -305.24 2.17
19965.21 91.79 311.44 3,585.30 243.42 S 13,788.33 W -243.42 2.50
20058.50 92.93 312.55 3,581.46 181.06 S 13,857.60 W -181.06 1.70
20151.82 91.10 312.51 3,578.18 118.02 S 13,926.32 W -118.02 1.96
20245.29 86.57 312.10 3,580.08 55.14 S 13,995.42 W -55.14 4.87
20338.71 85.62 311.62 3,586.44 7.06 N 14,064.83 W 7.06 1.14
20431.98 85.61 311.26 3,593.57 68.61 N 14,134.55 W 68.61 0.38
20525.33 88.26 312.23 3,598.56 130.66 N 14,204.09 W 130.66 3.02
20618.78 88.01 312.31 3,601.60 193.49 N 14,273.20 W 193.49 0.28
20712.16 88.14 311.58 3,604.74 255.87 N 14,342.62 W 255.87 0.79
20805.58 89.26 311.66 3,606.86 317.90 N 14,412.44 W 317.90 1.20
20898.92 91.03 311.99 3,606.62 380.14 N 14,481.99 W 380.14 1.93
20992.36 92.40 311.70 3,603.83 442.45 N 14,551.57 W 442.45 1.50
21085.79 93.27 311.08 3,599.21 504.15 N 14,621.57 W 504.15 1.14
21179.05 97.27 311.02 3,590.64 565.12 N 14,691.59 W 565.12 4.29
21272.36 101.32 311.02 3,575.57 625.54 N 14,761.05 W 625.54 4.34
21365.64 105.76 310.77 3,553.74 684.90 N 14,829.59 W 684.90 4.77
21458.95 108.98 311.18 3,525.89 743.29 N 14,896.82 W 743.29 3.48
21552.30 110.56 311.06 3,494.31 801.06 N 14,962.99 W 801.06 1.70
21645.64 111.64 310.62 3,460.71 858.01 N 15,028.87 W 858.01 1.24
21739.05 113.35 311.44 3,424.97 914.65 N 15,093.97 W 914.65 2.00
21749.75 113.40 311.37 3,420.73 921.15 N 15,101.34 W 921.15 0.76
21813.00 113.40 311.37 3,395.61 959.51 N 15,144.90 W 959.51 0.00
INSITE V7.4.20 Page 6Job No:AK-XX-0900577139 Well Name:SP36-W5 Survey Report
WELL INFORMATION
Customer :Eni Petroleum
Well Name :SP36-W5 L1
Job Number :AK-XX-0900577139
Rig Name :Doyon 15
Field Name :Nikaitchuq
Country :USA
Survey Report
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00
40.57 0.00 0.00 40.57 0.00 N 0.00 E 0.00 0.00
79.86 0.60 288.64 79.86 0.07 N 0.19 W 0.07 1.53
119.60 0.68 279.83 119.60 0.17 N 0.62 W 0.17 0.32
124.31 0.86 277.26 124.31 0.18 N 0.69 W 0.18 3.89
133.21 0.78 273.99 133.21 0.19 N 0.81 W 0.19 1.04
143.13 0.61 266.62 143.12 0.20 N 0.93 W 0.20 1.93
153.18 0.38 236.25 153.17 0.17 N 1.01 W 0.17 3.40
162.88 0.36 188.01 162.87 0.13 N 1.05 W 0.13 3.12
183.44 0.87 162.94 183.43 0.09 S 1.01 W -0.09 2.75
193.03 1.18 165.42 193.02 0.25 S 0.96 W -0.25 3.26
204.76 1.53 166.67 204.75 0.52 S 0.90 W -0.52 2.99
214.53 1.90 168.34 214.51 0.81 S 0.83 W -0.81 3.82
224.41 2.18 168.06 224.39 1.15 S 0.76 W -1.15 2.84
234.64 2.59 169.49 234.61 1.57 S 0.68 W -1.57 4.05
263.85 3.54 176.29 263.78 3.12 S 0.50 W -3.12 3.48
295.43 4.79 177.99 295.27 5.41 S 0.39 W -5.41 3.98
326.22 5.44 187.18 325.94 8.14 S 0.53 W -8.14 3.39
358.64 5.43 192.89 358.21 11.16 S 1.06 W -11.16 1.67
388.02 6.01 197.03 387.45 13.99 S 1.82 W -13.99 2.42
449.10 7.91 198.98 448.08 21.02 S 4.13 W -21.02 3.13
541.98 11.58 201.63 539.60 35.73 S 9.64 W -35.73 3.98
634.91 13.57 201.81 630.30 54.53 S 17.13 W -54.53 2.14
728.11 17.88 200.32 719.99 78.11 S 26.17 W -78.11 4.64
821.36 21.90 198.81 807.66 108.01 S 36.75 W -108.01 4.35
914.91 25.48 197.54 893.31 143.72 S 48.44 W -143.72 3.87
972.32 27.29 196.58 944.74 168.11 S 55.92 W -168.11 3.24
1065.55 29.68 194.53 1,026.68 210.94 S 67.81 W -210.94 2.77
1158.85 31.40 193.85 1,107.03 256.91 S 79.43 W -256.91 1.88
1252.22 31.22 192.03 1,186.81 304.19 S 90.29 W -304.19 1.03
1345.58 35.22 190.04 1,264.90 354.39 S 100.03 W -354.39 4.44
1439.01 38.27 191.59 1,339.76 409.27 S 110.55 W -409.27 3.41
INSITE V7.4.20 Page 1Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1532.27 36.51 192.89 1,413.85 464.61 S 122.54 W -464.61 2.07
1625.52 38.05 195.34 1,488.05 519.37 S 136.33 W -519.37 2.29
1718.81 42.61 197.53 1,559.15 577.25 S 153.46 W -577.25 5.12
1812.13 45.51 198.59 1,626.21 638.93 S 173.59 W -638.93 3.21
1905.60 44.58 198.23 1,692.25 701.69 S 194.48 W -701.69 1.03
1999.02 44.70 197.52 1,758.72 764.16 S 214.63 W -764.16 0.55
2093.12 50.09 197.35 1,822.40 830.22 S 235.37 W -830.22 5.73
2185.64 52.83 197.76 1,880.04 899.21 S 257.20 W -899.21 2.98
2279.09 54.21 198.94 1,935.60 970.52 S 280.86 W -970.52 1.79
2372.47 57.26 199.59 1,988.17 1,043.36 S 306.33 W -1043.36 3.32
2466.17 61.03 199.89 2,036.21 1,119.06 S 333.49 W -1119.06 4.03
2559.23 60.99 201.82 2,081.32 1,195.12 S 362.47 W -1195.12 1.81
2652.67 62.94 206.70 2,125.25 1,270.26 S 396.37 W -1270.26 5.06
2746.10 59.58 211.60 2,170.19 1,341.79 S 436.20 W -1341.79 5.84
2839.36 56.47 216.03 2,219.59 1,407.51 S 480.16 W -1407.51 5.23
2932.67 58.66 222.19 2,269.67 1,468.54 S 529.84 W -1468.54 6.04
3025.95 61.75 226.80 2,316.03 1,526.22 S 586.58 W -1526.22 5.42
3101.21 65.59 229.54 2,349.41 1,571.17 S 636.84 W -1571.17 6.06
3201.21 70.59 232.32 2,386.72 1,629.58 S 708.86 W -1629.59 5.63
3300.89 74.94 233.36 2,416.25 1,687.07 S 784.72 W -1687.07 4.48
3400.09 79.25 234.14 2,438.40 1,744.23 S 862.68 W -1744.23 4.41
3500.12 81.46 236.18 2,455.16 1,800.55 S 943.62 W -1800.55 2.99
3568.13 82.92 235.35 2,464.40 1,838.46 S 999.32 W -1838.46 2.46
3661.52 83.26 234.57 2,475.64 1,891.69 S 1,075.23 W -1891.69 0.91
3754.95 82.98 232.80 2,486.83 1,946.62 S 1,149.97 W -1946.62 1.90
3848.27 82.73 231.87 2,498.44 2,003.20 S 1,223.26 W -2003.20 1.02
3941.53 83.14 230.67 2,509.91 2,061.10 S 1,295.46 W -2061.10 1.35
4034.87 83.14 230.19 2,521.06 2,120.14 S 1,366.90 W -2120.14 0.51
4128.26 82.84 229.03 2,532.46 2,180.20 S 1,437.49 W -2180.20 1.27
4221.78 82.64 228.38 2,544.27 2,241.42 S 1,507.19 W -2241.42 0.72
4315.17 82.33 224.61 2,556.49 2,305.15 S 1,574.34 W -2305.15 4.02
4408.56 83.03 228.36 2,568.40 2,368.91 S 1,641.50 W -2368.91 4.05
4501.98 83.14 227.96 2,579.64 2,430.78 S 1,710.59 W -2430.78 0.44
4595.41 83.07 227.55 2,590.86 2,493.13 S 1,779.26 W -2493.13 0.44
4688.75 82.89 228.16 2,602.27 2,555.30 S 1,847.94 W -2555.30 0.68
4782.11 83.02 228.50 2,613.72 2,616.90 S 1,917.16 W -2616.90 0.39
4875.57 82.98 228.35 2,625.11 2,678.45 S 1,986.55 W -2678.46 0.16
4969.02 83.23 228.47 2,636.33 2,740.04 S 2,055.94 W -2740.04 0.30
5062.44 82.97 228.63 2,647.55 2,801.43 S 2,125.45 W -2801.43 0.33
5155.83 83.16 229.06 2,658.83 2,862.44 S 2,195.25 W -2862.44 0.50
5249.27 83.26 229.11 2,669.87 2,923.21 S 2,265.37 W -2923.21 0.12
5342.98 82.75 229.00 2,681.29 2,984.16 S 2,335.63 W -2984.16 0.56
5436.09 83.49 229.61 2,692.44 3,044.44 S 2,405.71 W -3044.44 1.03
5529.50 82.75 229.92 2,703.63 3,104.34 S 2,476.51 W -3104.34 0.86
5622.89 83.11 229.47 2,715.12 3,164.29 S 2,547.18 W -3164.29 0.61
INSITE V7.4.20 Page 2Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
5716.30 83.22 229.48 2,726.24 3,224.55 S 2,617.68 W -3224.55 0.12
5809.69 83.19 228.93 2,737.29 3,285.14 S 2,687.89 W -3285.14 0.59
5903.05 82.88 229.55 2,748.61 3,345.64 S 2,758.08 W -3345.64 0.74
5996.51 83.05 229.59 2,760.06 3,405.80 S 2,828.69 W -3405.80 0.19
6089.93 81.99 229.46 2,772.22 3,465.92 S 2,899.14 W -3465.92 1.14
6183.28 82.21 229.79 2,785.05 3,525.82 S 2,969.59 W -3525.82 0.42
6276.69 82.27 230.00 2,797.66 3,585.44 S 3,040.38 W -3585.44 0.23
6370.12 81.99 230.65 2,810.46 3,644.53 S 3,111.61 W -3644.53 0.75
6463.54 82.10 231.08 2,823.38 3,702.92 S 3,183.37 W -3702.92 0.47
6556.97 81.87 231.70 2,836.41 3,760.65 S 3,255.67 W -3760.66 0.70
6650.37 82.12 231.68 2,849.42 3,817.99 S 3,328.24 W -3817.99 0.27
6743.79 82.17 232.56 2,862.19 3,874.81 S 3,401.29 W -3874.81 0.93
6837.25 82.50 233.41 2,874.65 3,930.57 S 3,475.24 W -3930.57 0.97
6930.75 82.72 233.74 2,886.68 3,985.63 S 3,549.85 W -3985.63 0.42
7024.07 82.24 234.09 2,898.89 4,040.12 S 3,624.62 W -4040.12 0.63
7117.46 82.66 233.68 2,911.16 4,094.69 S 3,699.41 W -4094.69 0.63
7210.85 82.40 233.98 2,923.30 4,149.34 S 3,774.16 W -4149.34 0.42
7304.31 82.43 233.82 2,935.64 4,203.92 S 3,849.01 W -4203.92 0.17
7397.70 82.56 233.41 2,947.84 4,258.85 S 3,923.55 W -4258.85 0.46
7491.12 82.52 233.38 2,959.97 4,314.08 S 3,997.91 W -4314.08 0.05
7584.50 82.49 232.60 2,972.15 4,369.81 S 4,071.84 W -4369.81 0.83
7677.93 82.56 233.01 2,984.30 4,425.81 S 4,145.63 W -4425.81 0.44
7771.52 82.49 232.22 2,996.48 4,482.15 S 4,219.36 W -4482.16 0.84
7864.88 82.46 231.75 3,008.70 4,539.16 S 4,292.28 W -4539.16 0.50
7958.35 82.59 231.07 3,020.86 4,596.96 S 4,364.72 W -4596.96 0.73
8051.72 82.49 231.02 3,032.99 4,655.17 S 4,436.72 W -4655.17 0.12
8145.13 83.35 231.28 3,044.50 4,713.32 S 4,508.91 W -4713.32 0.96
8238.46 82.72 231.20 3,055.82 4,771.31 S 4,581.15 W -4771.31 0.68
8330.13 83.14 230.93 3,067.10 4,828.48 S 4,651.91 W -4828.49 0.54
8425.04 83.07 230.57 3,078.49 4,888.10 S 4,724.88 W -4888.10 0.38
8518.40 83.01 230.67 3,089.81 4,946.90 S 4,796.51 W -4946.90 0.12
8611.85 83.07 230.49 3,101.13 5,005.80 S 4,868.17 W -5005.80 0.20
8705.13 83.07 230.21 3,112.39 5,064.89 S 4,939.46 W -5064.89 0.30
8798.41 83.07 231.87 3,123.64 5,123.11 S 5,011.46 W -5123.11 1.77
8891.79 82.80 230.29 3,135.13 5,181.33 S 5,083.56 W -5181.33 1.70
8985.19 82.80 229.73 3,146.83 5,240.88 S 5,154.56 W -5240.88 0.59
9078.75 83.20 229.05 3,158.24 5,301.32 S 5,225.05 W -5301.32 0.84
9172.15 82.03 229.62 3,170.24 5,361.68 S 5,295.31 W -5361.68 1.39
9265.52 82.67 228.78 3,182.67 5,422.14 S 5,365.36 W -5422.15 1.12
9358.72 82.64 229.13 3,194.59 5,482.84 S 5,435.07 W -5482.84 0.37
9451.97 82.78 228.76 3,206.42 5,543.59 S 5,504.82 W -5543.59 0.42
9545.52 83.44 228.70 3,217.64 5,604.85 S 5,574.63 W -5604.85 0.71
9636.18 82.35 232.41 3,228.86 5,662.00 S 5,644.09 W -5662.00 4.23
9729.41 81.11 234.84 3,242.27 5,716.72 S 5,718.36 W -5716.72 2.90
9822.71 81.57 237.99 3,256.32 5,767.73 S 5,795.19 W -5767.73 3.37
INSITE V7.4.20 Page 3Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
9916.08 81.17 242.13 3,270.34 5,813.79 S 5,875.16 W -5813.79 4.40
10009.44 81.25 245.30 3,284.61 5,854.65 S 5,957.88 W -5854.65 3.36
10102.87 81.63 248.72 3,298.52 5,890.72 S 6,042.92 W -5890.72 3.64
10196.13 82.27 253.13 3,311.59 5,920.89 S 6,130.16 W -5920.89 4.73
10289.38 82.35 258.37 3,324.07 5,943.63 S 6,219.70 W -5943.63 5.57
10382.67 82.67 264.31 3,336.24 5,957.55 S 6,311.10 W -5957.55 6.32
10475.99 82.87 269.60 3,348.00 5,962.46 S 6,403.51 W -5962.46 5.63
10569.46 83.24 272.09 3,359.30 5,961.09 S 6,496.28 W -5961.09 2.67
10662.88 83.70 274.15 3,369.93 5,956.04 S 6,588.95 W -5956.04 2.25
10756.15 84.22 275.97 3,379.74 5,947.86 S 6,681.33 W -5947.86 2.02
10849.50 84.54 278.16 3,388.88 5,936.44 S 6,773.52 W -5936.44 2.36
10942.95 84.45 279.66 3,397.85 5,922.03 S 6,865.42 W -5922.03 1.60
11036.33 84.56 281.62 3,406.79 5,904.87 S 6,956.77 W -5904.87 2.09
11129.75 84.28 283.97 3,415.88 5,884.28 S 7,047.43 W -5884.28 2.52
11223.09 84.54 286.50 3,424.97 5,859.87 S 7,137.05 W -5859.87 2.71
11316.53 84.48 288.40 3,433.91 5,831.98 S 7,225.78 W -5831.98 2.03
11409.96 84.59 290.04 3,442.81 5,801.36 S 7,313.60 W -5801.36 1.75
11437.00 84.39 290.76 3,445.41 5,791.98 S 7,338.82 W -5791.98 2.75
11454.00 84.42 288.70 3,447.06 5,786.27 S 7,354.75 W -5786.27 12.06
11482.40 84.47 289.62 3,449.81 5,776.99 S 7,381.45 W -5776.99 3.23
11577.41 82.73 289.85 3,460.40 5,745.11 S 7,470.32 W -5745.11 1.85
11652.98 83.99 290.32 3,469.14 5,719.33 S 7,540.81 W -5719.33 1.78
11746.39 86.53 292.20 3,476.86 5,685.58 S 7,627.56 W -5685.58 3.38
11839.75 86.71 294.41 3,482.37 5,648.71 S 7,713.15 W -5648.71 2.37
11924.90 87.12 297.68 3,486.95 5,611.38 S 7,789.53 W -5611.38 3.86
12026.38 87.31 302.18 3,491.88 5,560.82 S 7,877.35 W -5560.82 4.43
12119.73 86.27 304.85 3,497.11 5,509.37 S 7,955.05 W -5509.37 3.07
12213.33 85.93 308.71 3,503.48 5,453.47 S 8,029.83 W -5453.47 4.13
12306.36 85.91 311.45 3,510.10 5,393.73 S 8,100.82 W -5393.73 2.94
12399.71 87.00 312.97 3,515.87 5,331.13 S 8,169.83 W -5331.13 2.00
12493.07 87.66 314.39 3,520.22 5,266.73 S 8,237.27 W -5266.73 1.68
12586.44 90.18 315.18 3,521.98 5,200.97 S 8,303.52 W -5200.97 2.83
12679.91 91.05 313.90 3,520.98 5,135.41 S 8,370.14 W -5135.41 1.66
12773.23 90.78 312.65 3,519.49 5,071.45 S 8,438.07 W -5071.45 1.37
12866.55 90.11 311.52 3,518.76 5,008.91 S 8,507.33 W -5008.91 1.41
12959.81 89.76 310.03 3,518.87 4,948.00 S 8,577.95 W -4948.01 1.64
13053.20 89.77 309.84 3,519.25 4,888.06 S 8,649.56 W -4888.06 0.20
13146.71 89.72 308.99 3,519.67 4,828.69 S 8,721.80 W -4828.69 0.91
13240.13 90.82 310.20 3,519.23 4,769.15 S 8,793.78 W -4769.15 1.75
13333.50 90.80 309.85 3,517.91 4,709.10 S 8,865.28 W -4709.10 0.38
13426.95 90.81 309.29 3,516.59 4,649.58 S 8,937.30 W -4649.58 0.60
13520.35 90.23 308.77 3,515.75 4,590.77 S 9,009.86 W -4590.77 0.83
13613.71 90.84 308.55 3,514.88 4,532.45 S 9,082.75 W -4532.45 0.69
13707.06 90.97 308.58 3,513.40 4,474.26 S 9,155.73 W -4474.26 0.14
13800.48 89.82 308.28 3,512.76 4,416.20 S 9,228.91 W -4416.20 1.27
INSITE V7.4.20 Page 4Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
13893.96 89.00 308.93 3,513.72 4,357.87 S 9,301.96 W -4357.88 1.12
13987.35 86.64 309.06 3,517.27 4,299.16 S 9,374.49 W -4299.16 2.53
14080.78 88.00 311.63 3,521.64 4,238.74 S 9,445.61 W -4238.74 3.11
14174.20 87.65 313.24 3,525.19 4,175.75 S 9,514.50 W -4175.75 1.76
14267.61 89.16 313.14 3,527.79 4,111.85 S 9,582.58 W -4111.85 1.62
14361.04 89.86 314.24 3,528.59 4,047.32 S 9,650.13 W -4047.32 1.40
14454.46 90.44 314.23 3,528.34 3,982.15 S 9,717.07 W -3982.15 0.62
14547.87 90.34 312.91 3,527.71 3,917.77 S 9,784.74 W -3917.77 1.42
14641.24 92.27 313.94 3,525.58 3,853.61 S 9,852.53 W -3853.61 2.34
14734.62 89.88 313.02 3,523.83 3,789.37 S 9,920.27 W -3789.37 2.74
14827.98 90.33 312.35 3,523.66 3,726.07 S 9,988.90 W -3726.07 0.86
14921.43 89.88 311.47 3,523.48 3,663.65 S 10,058.45 W -3663.65 1.06
15014.87 89.73 310.77 3,523.80 3,602.20 S 10,128.84 W -3602.20 0.77
15108.26 90.27 311.32 3,523.80 3,540.88 S 10,199.27 W -3540.88 0.83
15201.60 90.28 311.22 3,523.35 3,479.31 S 10,269.43 W -3479.31 0.11
15295.10 90.27 312.23 3,522.91 3,417.08 S 10,339.21 W -3417.09 1.08
15388.50 90.88 312.21 3,521.97 3,354.33 S 10,408.37 W -3354.33 0.65
15481.94 91.76 311.67 3,519.82 3,291.89 S 10,477.86 W -3291.89 1.10
15575.28 93.00 311.82 3,515.94 3,229.80 S 10,547.44 W -3229.80 1.34
15668.74 91.68 312.49 3,512.12 3,167.13 S 10,616.66 W -3167.13 1.58
15762.19 91.96 312.57 3,509.16 3,103.99 S 10,685.49 W -3103.99 0.31
15855.66 91.58 313.56 3,506.27 3,040.20 S 10,753.75 W -3040.20 1.13
15949.06 91.90 313.81 3,503.43 2,975.72 S 10,821.26 W -2975.72 0.43
16042.40 91.62 314.53 3,500.57 2,910.71 S 10,888.18 W -2910.71 0.83
16135.78 89.30 314.35 3,499.82 2,845.34 S 10,954.84 W -2845.34 2.49
16229.23 90.19 314.12 3,500.23 2,780.15 S 11,021.80 W -2780.15 0.98
16322.66 90.24 312.86 3,499.88 2,715.85 S 11,089.58 W -2715.85 1.35
16416.06 90.80 311.86 3,499.03 2,652.92 S 11,158.59 W -2652.92 1.23
16509.46 90.26 312.57 3,498.17 2,590.17 S 11,227.76 W -2590.17 0.96
16602.82 88.30 311.62 3,499.34 2,527.59 S 11,297.03 W -2527.59 2.33
16696.42 87.07 310.33 3,503.12 2,466.27 S 11,367.63 W -2466.27 1.90
16789.87 86.38 309.85 3,508.46 2,406.18 S 11,439.01 W -2406.18 0.90
16883.29 88.20 308.84 3,512.88 2,347.03 S 11,511.17 W -2347.03 2.23
16976.72 89.84 308.53 3,514.48 2,288.64 S 11,584.09 W -2288.64 1.79
17070.03 90.92 309.71 3,513.86 2,229.77 S 11,656.48 W -2229.77 1.71
17163.46 89.27 309.30 3,513.70 2,170.34 S 11,728.56 W -2170.34 1.82
17256.79 88.37 310.25 3,515.63 2,110.64 S 11,800.28 W -2110.64 1.40
17350.06 87.44 309.92 3,519.04 2,050.62 S 11,871.59 W -2050.62 1.06
17443.37 87.25 310.84 3,523.36 1,990.24 S 11,942.59 W -1990.24 1.01
17536.79 87.26 311.07 3,527.83 1,929.07 S 12,013.06 W -1929.07 0.25
17630.10 86.97 310.55 3,532.53 1,868.17 S 12,083.60 W -1868.17 0.64
17723.83 87.78 311.20 3,536.82 1,806.90 S 12,154.39 W -1806.90 1.11
17816.73 88.08 311.06 3,540.18 1,745.83 S 12,224.32 W -1745.83 0.36
17910.10 90.53 311.40 3,541.31 1,684.30 S 12,294.53 W -1684.30 2.65
18003.62 92.27 312.72 3,539.03 1,621.67 S 12,363.94 W -1621.67 2.34
INSITE V7.4.20 Page 5Job No:AK-XX-0900577139 Well Name:SP36-W5 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
18097.09 90.79 313.68 3,536.53 1,557.71 S 12,432.05 W -1557.71 1.89
18190.46 90.01 313.60 3,535.88 1,493.28 S 12,499.62 W -1493.28 0.84
18283.73 89.98 314.28 3,535.89 1,428.56 S 12,566.78 W -1428.56 0.73
18377.04 90.87 315.08 3,535.19 1,362.95 S 12,633.13 W -1362.95 1.28
18470.42 92.93 316.87 3,532.10 1,295.85 S 12,697.98 W -1295.85 2.92
18563.84 91.84 315.52 3,528.21 1,228.49 S 12,762.59 W -1228.49 1.86
18657.19 90.20 315.73 3,526.55 1,161.78 S 12,827.86 W -1161.78 1.77
18750.47 88.81 313.21 3,527.35 1,096.44 S 12,894.42 W -1096.44 3.09
18843.80 89.70 310.53 3,528.57 1,034.16 S 12,963.90 W -1034.16 3.03
18937.17 89.67 310.68 3,529.08 973.39 S 13,034.79 W -973.39 0.16
19030.53 90.25 310.11 3,529.15 912.89 S 13,105.89 W -912.89 0.87
19123.88 89.93 310.80 3,529.00 852.32 S 13,176.92 W -852.32 0.81
19217.13 87.54 312.76 3,531.06 790.22 S 13,246.44 W -790.22 3.31
19310.43 86.71 311.19 3,535.74 727.90 S 13,315.71 W -727.90 1.90
19403.75 84.63 310.74 3,542.78 666.89 S 13,385.97 W -666.89 2.28
19497.16 86.91 311.43 3,549.67 605.68 S 13,456.18 W -605.68 2.55
19591.09 86.52 309.70 3,555.06 544.70 S 13,527.41 W -544.70 1.89
19683.95 89.07 308.73 3,558.63 486.04 S 13,599.30 W -486.04 2.94
19777.19 89.79 310.40 3,559.56 426.65 S 13,671.17 W -426.65 1.95
19870.63 87.11 310.28 3,562.08 366.20 S 13,742.36 W -366.20 2.87
19964.02 87.33 309.83 3,566.61 306.17 S 13,813.76 W -306.17 0.54
20057.42 87.98 309.51 3,570.44 246.60 S 13,885.59 W -246.60 0.78
20150.84 92.10 310.67 3,570.37 186.45 S 13,957.05 W -186.45 4.58
20244.25 91.70 310.48 3,567.27 125.72 S 14,027.96 W -125.72 0.47
20337.64 90.84 310.97 3,565.20 64.81 S 14,098.71 W -64.81 1.06
20430.95 88.23 310.77 3,565.96 3.76 S 14,169.27 W -3.76 2.81
20524.26 89.72 310.01 3,567.63 56.69 N 14,240.32 W 56.69 1.79
20617.55 92.84 312.02 3,565.55 117.89 N 14,310.68 W 117.89 3.98
20710.85 92.76 313.70 3,560.99 181.27 N 14,378.99 W 181.27 1.80
20804.17 97.40 313.99 3,552.73 245.64 N 14,446.01 W 245.64 4.98
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.