Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
190-023
WELL HISTORY FILE COVER PAGE XHVZS This page identifies oversize material and digital information available for this individual Well History file and weather or not it is available in the LaserFiche file. Please insure that it remains as the first page in this file. / tj IJ t:J ;)-"""3 Well History File # Digital Data Added to LaserFiche File 0 CD's - # - 0 DVD's - # - 0 Diskettes - # - 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No Oversized Material Added to LaserFiche File 0 Maps # - 0 Mud Logs # - 0 Other # - 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No General Notes or Comments about this file. If any ofthe information listed above is not available in the LaserFiche file you may contact the Alaska Oil & Gas Conservation Commission to request copies. Please call Robin Deason at (907) 793~1225 if you have any questions or information requests regarding this file. , #"... " ,\ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1a. Well Status: 0 Oil 0 Gas 0 Plugged II Abandoned 0 Suspended 0 WAG 20AAC2S.10S 20AAC2S.110 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 714' SNL, 1323' EWL, SEC. 19, T11N, R12E, UM Top of Productive Horizon: 4508' NSL, 194' EWL, SEC. 07, T11N, R12E, UM Total Depth: 4860' NSL, 214' EWL, SEC. 07, T11N, R12E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 599043 y- 5959360 Zone- ASP4 TPI: x- 597778 y- 5969845 Zone- ASP4 Total Depth: x- 597794 y- 5970198 Zone- ASP4 18. Directional Survey 0 Yes II No 21. Logs Run: GR 1 SP 1 DIL 1 BHCS 1 CNL Zero Other 5. Date Comp., Susp., or Aband. 1/17/2004 6. Date Spudded 02105/1990 7. Date T.D. Reached 03/02/1990 8. KB Elevation (ft): KBE = 88.7 9. Plug Back Depth (MD+TVD) 14885 + 9058 10. Total Depth (MD+TVD) 14970 + 9100 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 1b. Well Class: II Development 0 Exploratory 0 Stratigraphic Test 0 Service 12. Permit to Drill Number 190-023 303-380 13. API Number 50- 029-22013-00-00 14. Well Name and Number: PBU Z-30 15. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 047450 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) 22. CASING, LINER AND CEMENTING RECORD J~~y:" ~jWr; :;;¡ ;Wt. ;~~~~T~?~!£~:~AARE~-}': =~~=~~~=:' ~~~~~~~~r~ i.~1};çèM.ã~~~~~Yf:'? -~~ - 30" Surface 110' Surface 110' 13-3/8" 68# L-80 Surface 2874' Surface 2674' 9-5/8" 47# NT80-S Surface 14229' Surface 8701' 5-1/2" 17# NT80-S 13980' 14970' 8560' 9100' 23. Perforations oRen to Production (MD + TVD of Top- and Bottom Interval, Size and Number; if none, state' none"): None MD TVD MD :AMqûriŒ PtJLLEO< 17-1/2" 4009 cu ft Permafrost 12-1/4" 3209 cu ft Class 'G' 8-112" 431 cu ft Class 'G' 2'4;<:;',-, ~;~~.îtlStNGR.Eè6~:' SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 13850' - 13973' TVD PACKER SET (MD) 13924' ~5i>;';¡~~}'~;:~L;t~!R~f.~éi~~:ÇeM§!ii~9~~~çTþ, ':~- , , DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13416' Set EZSV ../ 13391' Set Whipstock / ,',- ' ~b~ ?\1f~ 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheét:"W'òeci:ls$ary). Submit core chips; if none, state "none". . - None \¡:AR 2 2 200 PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-BBL GAs-McF WATER-BBL OIL-BBL Form 10-407 Revised 12/2003 GAs-McF WATER-BBL ORIGINAL CONTINUED ON REVERSE SIDE IØ)MS 8FL MAR 2 1 200\ ~Ç/ CHOKE SIZE I GAS-OIL RATIO OIL GRAVITY-API (CORR) ': '::,;n 22. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 14242' 8708' 8742' None Shublik A 14301' Sadlerochit 1 Zone 4 14557' 8885' \¡1AR 2 2 20D r ': , .:ì . ," 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble /fÔ ~ - ~ Title Technical Assistant Date 03. {q. 0 <f PBU Z-30 190-023 303-380 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Neil Magee, 564-5119 Permit No.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEMS: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 nD'c.'~J^1 Well: Field: API: Permit: Z -30A Prudhoe Bay Unit 50-029-22013-01 203-219 Accept: Spud: Release: Rig: 01/12/04 01/19/04 02/01/04 Nabors 7ES PRE-RIG WORK 01/01/04 . DRIFT WI 3.70 CENT, SAMPLE BAILER,TO TIGHT SPOT @ 13860 SLM, TARGET DEPTH = 12,870. 01/03/04 CORRELATED TO TUBING SUMMARY DATED 212/91. FLUID LEVEL 420' AFTER TUBING PUNCHED @ 13795'-13797' WITH 9 HOLES, SHOT 2 STRAND STRING SHOT FROM 13820'-13832', CUT TUBING @ 13830'. WELL SHUT IN. 01/08/04 WHP=300/350/300.PUMPED 1300 BBLS SEA H2O DOWN IA TAKING RETURNS UP TBG FOR CIRC OUT. PUMPED 20 BBLS METH AND 150 BBLS DIESEL FOR FREEZE PROTECT.WHP=010/200. Sf> Opel';atiol1s Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Z-30A Z-30A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Date r..rÐm~ To . Hours Phase Task. Coêieh NPT 1/1212004 00:00 - 03:00 3.00 MOB P 03:00 - 06:00 3.00 MOB P 06:00 - 07:00 1.00 MOB P 07:00 -15:00 8.00 MOB P 15:00 - 18:00 3.00 MOB P 18:00 -19:00 1.00 MOB P 19:00 - 20:00 1.00 MOB P 20:00 - 21 :00 1.00 RIGU P 21:00 - 00:00 3.00 RIGU P PRE PRE PRE PRE PRE PRE PRE PRE PRE 1/13/2004 00:00 - 00:30 0.50 RIGU P 00:30 - 01 :30 1.00 RIGU P 01:30 - 03:00 1.50 RIGU P 03:00 - 05:30 2.50 KILL P PRE PRE PRE DECOMP 05:30 - 07:00 1,50 CLEAN P DECOMP 07:00 - 08:00 1.00 PULL P DECOMP 08:00 - 08:30 0.50 WHSUR P DECOMP 08:30 -10:00 1.50 WHSUR P DECOMP 10:00 -11:30 1.50 WHSUR P DECOMP 11:30 -16:00 4.50 BOPSUR P DECOMP 16:00 - 16:30 0.50 BOPSUF\P DECOMP 16:30 - 22:00 5.50 BOPSUF\P DECOMP Page 1 -- Start: 1/12/2004 Rig Release: 2/1/2004 Rig Number: Spud Date: 1/15/2004 End: 2/1/2004 Description of Operations -. Held PJSM. RID, Prepped and Moved Rig Shop and Satellite Camp to Z Pad. Held PJSM. Broke Apart Rig Modules. Backed Pit Module Away From Sub. RID and Backed Sub Base Away from S-118. PI U and Loaded Rig Mats. Prepared to Move Rig. Held PJSM wI Security, Truck Drivers and Drilling Crew. Moved Rig from S-118 to Z-30A. Moved Rig onto Mats, Spotted Spools and Equipment in Cellar. Spotted and Leveled Rig Over Z-30A. Bermed Rig. Spotted Pit Module and Leveled Same. R I U Lines from Pit Module to Sub Base. Prepared to Take on Seawater. Spotted Slop Tank. Began Taking on 140 deg 8.5 ppg Seawater. Accepted Rig at 2000 hrs 1/12/2004. Continued to Take on 140 deg Seawater. R I U on Tree to Pump Down Tubing and Take Retums Off of Annulus Through Choke. Held Pre-Spud Meeting wI Drilling Crew, Tour Pusher and Drilling Supervisor. Held PJSM. R I U DSM Lubricator, Pulled BPV, RID DSM Lubricator. Tubing and Annulus on Vacuum. Weighted Up 140 deg Seawater to 8.6 ppg. Tested Lines to 3,500 psi, OK. Pumped Down Tubing and Took Returns Up Annulus Through Choke to Displace Wellbore to 140 deg 8.6 ppg Seawater. Staged Up Pump Rate as Follows: 3 bpm, 70 psi, Gained Retums w/1 0 bbls Pumped, 4 bpm 150 psi, 6 bpm 400 psi, 8 bpm 735 psi, 10 bpm 1,200 psi. Steady Pump Rate 10 bpm 1,200 psi. Total Wellbore Volume = 949 bbls. Total Volume Pumped To Displace Wellbore to Clean Fluid = 1,100 bbls. Closed Circulating System Back to Pits. Circulated and Conditioned Brine to 8.6 ppg In I 8.6 ppg Out. Pump Rate 10 bpm 1,200 psi. Monitored Well, Wellbore Losses 23.5 bph. Set TWC. Held PJSM. N I D Tree and Removed from Cellar fl NORM Inspection. Bled Down, Terminated and Plugged off Control Lines. Removed Adapter Flange and Inspected Tubing Hanger. Held PJSM. N I U 13-5/8" X 5,000 psi BOP Stack. Hydril Annular Preventer, Top Pipe Ram wI 3-1/2" x 6" Variable Rams, Blind Rams, Mud Cross, Lower Pipe Rams wI 3-1/2" x 6" Variable Rams, Spacer Spool, Kill and Choke Lines. R I U Test Equipment to Test BOPE. M I U Test Joint and RIH wI Same. Opened Annulus Valve. Filled BOP Stack. Held PJSM. Tested BOPE. Tested Upper and Lower Rams, Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves to 3,500 psi High J 250 psi Low. Tested Annular Preventer to 3,500 psi High 1250 psi Low. All Tests Held fl 5 Min wI No Leaks or Pressure Loss. BOPE Test Witnessed by AOGCC Rep John Spaulding. Note: IBOP would not Test. Printed 21212004 2 21'59 PM Page 2 .. Bf' Openations 8ummary:Réport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date Z-30A Z-30A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Task Code. NPT, Phase From - To Hours 1/13/2004 22:00 - 23:00 1.00 BOPSUFP DECOMP 23:00 - 00:00 1.00 PULL P DECOMP 00:00 - 01:30 1.50 PULL P DECOMP 1/14/2004 01:30 - 02:30 1.00 BOPSUf;.P DECOMP 02:30 - 03:00 0.50 PULL P DECOMP 03:00 - 03:30 0.50 PULL P DECOMP 03:30 - 04:30 1.00 PULL P DECOMP 04:30 - 06:30 2.00 PULL P DECOMP 06:30 -10:00 3.50 PULL P DECOMP 10:00 -11:00 1.00 PULL P DECOMP 11:00-00:00 13.00 PULL P DECOMP 1/15/2004 00:00 - 02:30 2.50 PULL P DECOMP 02:30 - 04:00 1.50 PULL P DECOMP 04:00 - 05:00 1.00 CLEAN P DECOMP 05:00 - 05:30 0.50 CLEAN P DECOMP 05:30 - 06:00 0.50 WHSUR P DECOMP 06:00 -10:00 4.00 CLEAN P DECOMP 10:00 - 12:00 2.00 CLEAN P DECOMP 12:00 - 00:00 12.00 CLEAN P DECOMP 1/1612004 00:00 - 11:00 11.00 CLEAN P DECOMP 11:00 -13:30 2.50 CLEAN P DECOMP Start: 1/12/2004 Rig Release: 2/1/2004 Rig Number: Spud Date: 1/15/2004 End: 2/1/2004 Description of Operations Blew Down All Lines, Closed Annular Valve, LID Test Joint. R I D BOPE Test Equipment. Brought to Rig Floor and R I U 4-1/2" Tubing Handling Equipment. Held PJSM. Set 7" Lubricator Extension wI 7" Otis Connection in Annular, Closed Bag. M I U DSM Lubricator to 7" Otis Connection. Pulled TWC, Well On Vacuum. RID DSM Lubricator and 7" Lubricator Extension. Steamed Inside of IBOP Valve. Valve was Frozen R I U and Retested IBOP to 3,500 psi High 1250 Low. Tests were Held fl 5 Min wI No Leaks or Pressure Loss. Held P JSM. M I U Spear wI 3.958" Double Grapples to 5" DP. RIH wI Spear and Engaged 4-112" Tubing. BOLDS, Pulled on Tubing to 125,000#, Tubing Hanger Moved Off Seat at 125,000#. Observed Tubing Movement at 135,000#, Pulled Tubing Hanger to Rig Floor, String Weight Up 140,000#. Broke Out and LID Spear. Tenninated Control Lines in Tubing Hanger. Broke Out and LID Tubing Hanger. R I U Circulating Head and Line. Circulated Bottoms Up, Pump Rate 10 bpm, 1,150 psi. Losses While Circulating 35 bph. R I U CAMCO Spooling Equipment. POOH and LID 4-112" 12.6# L-80 TDS Tubing. Spooled Up Dual Encapsulated Control Line. LID 52 Joints of 4-1/2" Tubing. Broke Out and LID SSSV Assembly. RID CAMCO Spooling Unit. Recovered 28 Control Line Clamps and 2 SS Bands. POOH L / D 4-112" 12.6# L-80 TDS Tubing. Held PJSM. POOH L / D 4-112" Tubing, Recovered the Following: 343 Jts 4-112" 12.6# L-80 TDS Tubing - 1 SSSV Assembly wI Control Line - 28 Control Line Clamps, 2 SS Bands - 5 GLM Assemblies - Cut Joint = 30.04'. Average Losses While POOH 15 bph. Note: NORM Report of Downhole Equipment: 1 - 2 Rem I hr. RID 4-112" Tubing Handling Equipment. Cleared and Cleaned Rig Floor. Held PJSM. Slipped and Cut Drilling Line. Serviced Rig. M I U Retrieving Tool, Ran and Set Wear Bushing. Held PJSM. Loaded 5" DP, 5" HWDP and 6-1/4" DC into Pipe Shed and Tallied Same. Held PJSM. M I U Mill I Clean Out BHA: Starting Mill - Lower MiII- Upper MiII- Bumper Sub - Oil Jars - XO - 9 X 6-1/4" DC- XO - 21 Jts 5" HWDP. BHA Total Length: 942.63' RIH wI Clean Out BHA on 5" DP. PI U 5" DP 1 x 1 from Pipe Shed. Held PJSM. RIH wI Clean Out BHA on 5" DP to 13,826', DPM. PI U 5" DP 1 x 1 from Pipe Shed. Tagged 4-112" Tubing Stub at 13,826'. M I U Top Drive and Circulated to Clean Wellbore. Pump Rate 7 bpm, 1,300 psi. Losses While Circulating 15 bph. Established Parameters: String Weight Up 275,000#, String Weight Down 160,000#, String Weight Rotating 210,000#, RPM 50, Torque Printed 21212004 2 21,59 PM BP Operations S;cummaryReport Page ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Z-30A Z-30A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 1/12/2004 Rig Release: 2/112004 Rig Number: Spud Date: 1/15/2004 End: 2/112004 Date From - To Hours Task Code NPT Phase Description of Operations 1/16/2004 11:00 - 13:30 2.50 CLEAN P DECOMP 14,000 ft Ilbs. Blew Down Top Drive, Monitored Well, Fluid Level Falling in Wellbore. 13:30 -20:30 7.00 CLEAN P DECOMP POOH wI 5" DP to 900'. Calculated Fill = 91 bbls, Actual Fill = 175 bbls. Losses = 84 bbls. 20:30 - 21 :30 1.00 CLEAN P DECOMP POOH wI BHA. Stood HWDP and Drill Collars in Derrick. 21:30-22:30 1.00 CLEAN P DECOMP Broke Out and LID Mills, Jars and Bumper Sub. 22:30 - 23:00 0.50 PXA P DECOMP Held PJSM wI Drilling Crew, Schlumberger Crew, Tour Pusher and Drilling Supervisor. 23:00 - 00:00 1.00 PXA P DECOMP R I U Schlumberger Sheaves and E-Line Equipment. Brought Logging Tool to Rig Floor. Gamma Ray I CCL - Junk Basket I 8.5" Gauge Ring. 1/1712004 00:00 - 01:30 1.50 PXA P DECOMP Held PJSM. RIH wI Schlumberger's Logging Tool: Gamma Ray I Collar Locator - Junk Basket wI 8.5" Gauge Ring. Stacked Out at 12,300'. Made Several Attempts to Work Past 12,300'. Last Attempts to Work Through Stacked Out at 12,300' Took 1,500# Overpull to Free Tools. Note: Circulated Over Hole During Operation, Losses 10 bph. 01 :30 - 02:00 0.50 PXA P DECOMP Logged Up from 12,300' to 11,200 for Partial Correlation Tie-In Log. Note: Circulated Over Hole During Operation, Losses 10 bph. 02:00 - 03:30 1.50 PXA P DECOMP POOH wI Tools to Surface. Note: Circulated Over Hole During Operation, Losses 10 bph. 03:30 - 04:30 1.00 PXA P DECOMP Washed Down Tools, Emptied Junk Basket. Recovered 1/4 Gallon Scale and Paraffin. Changed Out 8.5" Gauge Ring to 8.0" Gauge Ring. Changed Out to Larger Head wI Stronger Weak Point of 4,800# - 5,400#. Checked Tools, OK. Note: Circulated Over Hole During Operation, Losses 10 bph. 04:30 - 06:00 1.50 PXA' P DECOMP RIH wI Gamma Ray I Collar Locator - Junk Basket wI 8.0" Gauge Ring to 13,850'. Note: Circulated Over Hole During Operation, Losses 10 bph. 06:00 - 06:30 0.50 PXA P DECOMP Tagged Up on Tubing Stub at 13,850', WLM. Logged Up from 13,850' to 11,800', Correlated and Tied into Halliburton Open Hole Dual Spaced Neutron Log, 03-March-1990. Winch Chain on Schlumberger Truck Parted. Note: Circulated Over Hole During Operation, Losses 10 bph. 06:30 - 11 :30 5.00 PXA N SFAL DECOMP Held PJSM. Installed Primary T-Bar Clamp on E-Line and Slacked Off on Rig Blocks. Installed Secondary T-Bar Clamp on E-Line. Schlumberger's Mechanics Arrived on Location, Repaired Winch on Truck. Removed Secondary T-Bar Clamp from E-Line. Raised Rig Blocks and Elevator to Original Position. Removed Primary T-Bar Clamp. Note: Circulated Over Hole During Operation, Losses 10 bph. 11:30 -13:00 1.50 PXA P DECOMP POOH wI Logging Tools on E-Line. Note: Circulated Over Hole During Operation, Losses 10 bph. 13:00 - 13:30 0.50 PXA P DECOMP Broke Out and LID Junk Basket and Gauge Ring. Note: Circulated Over Hole During Operation, Losses 10 bph. 13:30 - 14:30 1.00 PXA P DECOMP Held PJSM. M I U HES 9-5/8" EZSV Bridge Plug to Schlumberger Running and Setting Tool wI Gamma Ray - CCL. Note: Circulated Over Hole During Operation, Losses 10 bph. 14:30 - 16:00 1.50 PXA P DECOMP RIH wI 9-518" EZSV on Schlumberger E-Line to 13,500'. Relogged Interval to Confirm Correlation. Set On Depth, CCL at 13,403.8' I CCL to Top of EZSV Stand Off 12.2' - Top of Printed 2/212004 2 21 59 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 1/17/2004 1/18/2004 Date SF> Operations Summary Report Z-30A Z-30A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES 14:30 - 16:00 From - To Hours DECOMP 16:00 - 17:00 17:00 - 18:00 18:00 - 19:00 19:00 - 20:30 20:30 - 21 :00 21:00 -00:00 00:00 - 07:30 07:30 - 08:30 08:30 - 10:00 10:00 - 16:00 Task Code NPT Phase 1.50 PXA P 1.00 PXA 1.00 PXA 1.00 PXA P P P DECOMP DECOMP DECOMP 1.50 WHSUR P DECOMP 0.50 STWHIP P WEXIT 3.00 STWHIP P WEXIT 7.50 STWHIP P WEXIT 1.00 STWHIP P WEXIT 1.50 STWHIP P WEXIT 6.00 STWHIP P WEXIT Page 4- Start: 1/12/2004 Rig Release: 2/1/2004 Rig Number: Spud Date: 1/15/2004 End: 2/1/2004 [)escription 'of Operations EZSVat 13,416'. Set HES 9-5/8" EZSV Bridge Plug at 13,416'. Pulled Up Hole to 13,350', RIH and Set Down on EZSVat 13,416' to Confirm Setting Depth. Note: Circulated Over Hole During Operation, losses 10 bph. losses Stopped After Setting EZSV. POOH wI Running and Setting Tool on E-Line. RID Schlumberger's Sheaves and E-Line Equipment. Held PJSM. Closed Blind Rams, Pressure Tested 9-5/8" EZSV Plug and 9-5/8" Casing to 3,500 psi fl 30 minutes, OK. Calculated Strokes to Pressure Up to 3,500 psi, 166 - 11.50 bbls, Actual Strokes 185 -12.75 bbls. Bled off Pressure, Opened Blind Rams. Blew Down Lines. Held PJSM. M I U Retrieving Tool, latched and Pulled Wear Bushing. M I U PackoffTool to 5" DP. RIH Through BOP Stack Set into and Engaged 9-5/8" Packoff, BOLDS. Pulled Up On DP to 25,000#, Packoff Came Free. Pulled Packoff to Floor. Broke Out Old Packoff, M I U New 9-5/8" Packoff onto Running Tool. RIH and Set Packoff in Wellhead. RllDS. Tested 9-5/8" Packoff to 5,000 psi f/1 0 Minutes, OK. Ran and Set Wear Bushing. Note: Bleed Trailer was Connected and Open to 13-3/8" x 9-5/8" OA During the Entire Operation wI 0 psi. Held PJSM wI Drilling Crew, Baker Rep, Anadrill Crew, Tool Pusher and Drilling Supervisor. M I U Whipstock I Milling BHA: Bottom Trip Anchor- Whipstock Slide - 8" Starter MiII- 8" lower MiII- 8.51" Upper MiII-1 Jt 5" HWDP - XO - Float Sub - MWD - XO - UBHO Sub - XO - 9 x 6-1/4" DC - XO - 21 Jts 5" HWDP. Total BHA length: 1,021.67'. Held PJSM. RIH wI Whipstock BHA on 5" DP to 13,283'. Tripping Speed 1-1/2 - 2 Minutes I Stand. Filled Pipe Every 30 Stands. M I U Top Drive, Engaged Pumps, Established Parameters: Pump Rate 500 gpm, 2,100 psi, String Weight Up 215,000#, String Weight Down 153,000#. Oriented Whipstock 52 deg left and RIH very slowly, Tagged Up at 13,391' Drill Pipe Measurement. Set Down wI 25,000# and Set Whipstock Trip Anchor. Picked Up wI 10,000# Overpull to Confirm Anchor Set. Slacked Off and Stacked Out wI 40,000# and Sheared off of Whipstock. Pulled up and Confirmed Whipstock was Set and Sheared. Held PJSM. Displaced Wellbore to 11.6 ppg lSND Milling Fluid. Pump Rate 575 gpm, 2,450 psi. Circulated Mud System 1 Full Circulation, 11.6 ppg - In, 11.6 ppg - Out. Addition of EP Mudlube to System While Displacing and Milling, 0.5% by Volume. Milled Window from 13,367'to 13,383'. WOM 10,000#- 20,000#, RPM 70 - 100, Torque Off Bottom 10,000 ft Ilbs, Torque On Bottom 13,000 - 15,000 ft Ilbs, Pump Rate 500 gpm, 2,125 psi. Pumped 30 bbl Hi-Vis Sweeps wI Super Sweep Material Every 2-1/2 Hours. String Weight Up 215,000#, String Weight Down 153,000#, String Weight Rotating 185,000#. -- -- Pnnted 2I2l2OO4 2:21'59 PM ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ÐP Operati 0 ns 8",mmary Repo rt Z-30A Z-30A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Page 5~ Start: 1/12/2004 Rig Release: 2/1/2004 Rig Number: Spud Date: 1/15/2004 End: 2/1/2004 Date From - To Hours Task Code NPT PJ:1ase 1/18/2004 10:00 - 16:00 6.00 STWHIP P WEXIT 16:00 - 17:30 1.50 STWHIP P WEXIT 17:30 - 18:00 0.50 EVAL P WEXIT 18:00 - 18:30 0.50 STWHIP P WEXIT 18:30 - 00:00 5.50 STWHIP P WEXIT 1/19/2004 00:00 - 02:30 2.50 STWHIP P WEXIT 02:30 - 03:30 1.00 STWHIP P WEXIT 03:30 - 05:00 1.50 BOPSURP WEXIT 05:00 - 07:00 07:00 -13:00 13:00 -14:00 14:00 - 00:00 2.00 DRILL P WEXIT 6.00 DRILL P WEXIT 1.00 DRILL P WEXIT 10.00 DRILL P INT1 Description of Operations Note: Top of Window 13,367' / Bottom of Window 13,383'. Drilled New Hole to 13,399'. Pumped and Circulated Around 30 bbl Hi-Vis Sweep wI Super Sweep Material. Pump Rate 500 gpm, 2,150 psi. Circulated until Returns Over Shakers were Clean. Note: Recovered 170# of Metal Cuttings. Held PJSM. Pulled Back in Window, Closed Pipe Rams and Performed FIT. Strokes Pmp'd Pressure 3 55 psi 6 103 psi 9 158 psi 12 217 psi 15 274 psi 18 353 psi 21 393 psi 24 461 psi 27 520 psi 30 582 psi 33 641 psi 34 645 psi MW 11.5 ppg, Window TVD 8,240', Pressure 645 psi = 13.00 ppg EMW. Held Pressure f/10 minutes, Pressure Leaked Off from 620 psi to 604 psi in 5 minutes. Pressure at 10 minutes 593 psi. Bled down Pressure, Opened Pipe Rams. Flow Checked Well, Well Static. Pumped Dry Job, Blew Down Lines. POOH wI 5" DP. Calculated Fill 91 bbls, Actual Fill 93.5 bbls. Held PJSM. Broke Out and LID 6-1/4" DC, UBHO Sub, MWD, Float Sub, and Mills. All Mills Were In Gauge. Cleared Rig Floor of BHA Components. Cleaned Rig Floor. M I U Retrieving Tool, Latched and Retrieved Wear Bushing. L I D Retrieving Tool. M I U BOP Stack Washer, Washed and Flushed BOP Stack. L / D BOP Stack Washer. M I U Running Tool, Ran and Set Wear Bushing. LID Running Tool. Held PJSM. M I U 8-112" Directional BHA: 8-112" DS70 PDC Bit Ser#200346 dressed w/6 x 14 Jets - 6-3/4" 7.0 Stg 4/5 Lobe XP Mud Motor w/1.5 deg Bend - 8-112" Stabilizer - CDR Assembly - MWD Assembly - 8-112" Stabilizer - 3 x 6-3/4" Flex Collars - XO - 1 Jt 5" HWDP - Jars - 22 Jts 5" HWDP. Total BHA Length: 903.88'. Oriented Motor to MWD. Pulsed Tested MWD, OK. RIH wI 8-112" Directional BHA on 5" DP to 13,351'. Calculated Displacement = 88 bbls, Actual Displacement 87 bbls. M I U Top Drive, Established Parameters: String Weight Up 210,000#, String Weight Down 155,000#, String Weight Rotating 175,000#, RPM 60, Torque 10,000 ft fibs Pump Rate 500 gpm, 2,250 psi, ECD 12.6 ppg. Oriented Tools 60 deg Left, Shut Down Pumps, RIH Through Window. Re-Engaged Pumps, Washed Down as Precaution from 13,385' to 13,399'. Pump Rate 500 gpm, 2,250 psi. Drilled 8-112" Directional Hole by Rotjting ""Id.$lh:lil'l§ ffulll 13,1QO'to 13,000 . \NUB Sliding 8,000# -10,000#, WOB Printed 21212004 221,59 PM t ( To: Winton Aubert - AOGCC Date: December 16, 2003 From: Neil Magee - BPXA GPB Rotary Drilling Subject: Z-30 Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of PBU well Z-30. Currently the well is shut-in and has production tubing that is collapsed at approximately 13,864' MD and has a failed 9-5/8" casing pack-off. A /' horizontal sidetrack is seen as the most viable option to restore well bore integrity, access additional reserves, and maximize value. P and A of the original wellbore will be accomplished by recovering the tubing from above the collapsed joint, setting a bridge plug just above the stub and pressure testing to 3500 psi and providing 150' of /' cement in the 7" x 9-5/8" annulus above this point during the cementation of the drilling liner. / The Z-30A sidetrack is currently scheduled for Nabors 7ES beginning around 1/15/03. The pre-rig work for this sidetrack will be priority scheduled immediately after the Application for Sundry is approved. Please contact me directly should any additional information be required. Neil Magee Prudhoe Bay Drilling Engineer 564-5119 SeODe Pre-Ria ODerations: Well Condition (12/9/03): Well was killed and freeze protected with 60/40 methanol on 1/11/03. Tubing is collapsed at approximately 13,884' as indicated by last LIB and video log run ./ 12/16/2002. 9-5/8" pack-off failed pressure test on 9/16/02. "Primary seal is leaking-secondary seal is holding". Description of pre-rig work: 1. Record SITP and IA pressure. " 2. Pull Otis SSSV at 211f' if present. Drift the 4-1/2" tubing to collapse point at 13,884'SLM - / collapsed tubing point {Ensure no ice is present in the tubing/ 3. Replace all live GL V's with dummy GL V's. .~ " 4. RIH with Schlumberger string shot and chemical cutter for 4-1/2" tubin Cut the tubing at / approximately 13,860'. 5. Circulate the wêlltoseawater and record SITP and IA pressures. (Contact ODE and discuss pressures recorded if seawater is not sufficient to kill well.) Plan on immediately freeze protecting Z-30 Application for Sundry ~GA~t~En) JA!N\ 2 ~ 2004 f { ( ( well if seawater provides sufficient hydrostatic pressure. Well should be freeze protected to 2100' with diesel in tubing and annulus. .,-/' 6. Function test all tubing hanger lockdown screws on the wellhead by backing out and re-torquing one at a time. 9-5/8" Pack-off failed test (9/17/02) No indication that tubing hanger seals have been tested. LDS checked and torqued to 650 ft-Ibs (9/17/02) U. Set BPV in tubing hanger and secure well. ./ 8. Prior to rig arrival remove well house and flowlines. If necessary level the pad and dig out the cellar. 9. Provide total cumulative cost to BP Drilling Supervisor on Handover. 'Tl~s \0' '-{OS C~ffr1JV~(., Summarv of Ria ODerations: 1. MIRU Nabors 7ES. Circulate out freeze protection and displace well to 8.4 ppg seawater. Pre-Rig ~k) may indicate a higher weight brine is required to kill well. (Formation pressure expected to be 8.1 ,ppg.) Set TWC. 2. - Ipple down tree. Nipple up and test BOPE to 3500 psi. 3. Pull and lay down 3-1/2" tubing from cut. 4. M/U 8-1/2" milling BHA. RIH PU drillpipe and drift down to remaining tubing stub. 5. RIH with EZSV on e-line and set at approximately 13,420'. Pressure test to 3500 psi. 6. Replace and test 9-5/8" mandrel hanger pack-off to 5000 psi. 7. RIH with 9-5/8" (47 Ib/ft) Baker bottom-trip anchor whipstock assembly. Orient whipstock and set on BP. Change well over to 11.6 ppg LSND milling/drilling mud. Mill window in 9-5/8" casing at -13,400' MD. Prior to POH, perform FIT to 13.0 ppg EMW. 8. RIH with 8-1/2" drilling assembly (with MWD/GR/RES) to whipstock. Kick-off and drill the 8-1/2" intermediate section to Top Sag @ :f:14,092' MD (8717' TVD). 9. Run and cement 7",26# intermediate drilling liner to -150' back into window. POH. 10. Make up and RIH with a 6-1/8" directional assembly (with MWD/GR/RES/ABI). Pressure test casing to 3500 psi. Drill landing collar and clean out shoe track. Swap mud over to 8.7 ppg FloPro drill in fluid. 11. Drill 20' of new formation. Conduct FIT to 10.0 ppg EMW. 12. Drill 6-1/8" production section as per directional plan to an estimated TD of 16,890' MD (8899' TVD). 13. Run 4 ¥2", 12.6# L-80 slotted production liner throughout the 6-1/8" well bore. After setting liner top packer displace to clean seawater above liner top. 14. Test the 4-1(2",7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 2000 psi for 30 min. POH LD excess drill pipe. 15. Run a 4-1/2", 12.6# 13Cr Vam Ace completion tying into the 4-1/2" liner top. 16. Set packer and test the tubing and annulus to 3500 psi for 30 minutes. 17. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 18. Freeze protect the well to -2200' TVD and secure the well. 19. Rig down and move off. Post-Ria Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below production packer. Install gas lift valves. Z-30 Application for Sundry vJ G~ I 1-/ j q I ¿oc' 'š . . (STATE OF ALASKA ( IJrJ )2{¿:z1'~ ALASKA OIL AND GAS CONSERVATION COMMISSION Sf (VI' "7 ,? /1 ~0 APPLICATION FOR SUNDRY APPROVAL VV( / 20 MC 25.280 1. Type of Request: 181 Abandon / 0 Suspend 0 Operation Shutdown 0 Perforate 0 Variance 0 Other 0 Alter Casing 0 Repair Well 181 Plug Perforations 0 Stimulate 0 Time Extension 0 Chanç¡e Approved Proç¡ram 0 Pull Tubinç¡ 0 Perforate New PaolO Re-Enter Suspended Well 0 Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. !HI Development 0 Exploratory 190-023 ./ 3. Address: 0 Stratigraphic 0 Service 6. API Number: ",-' P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22013-00-00 7. KB Elevation (ft): KBE = 88 7 9. Well Name and Number: /" . PBU Z-30 8. Property Designation: 10. Field / Pool(s): ADL 047450 Prudhoe Bay Field / Prudhoe Bay Pool 11. ¡ '¡.¡"..,... ,¡"..' ,...' <.,... ,.,' .'" '.', ..., PRESEt'!TWEt..LCOND1T!ONSl)MMI\RY,:""..,'''.> , ',.. '. ".' ".'".. ,'.. ".,.' " Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 14970 9100 14885 9058 N/A 14885 Cååing,> Length" Size' " ' MD ' TVD ' ' ' Burst Collapse Structural Î "lnnllrtor 110' 30" 110' 110' Surface 2874' 13-3/8" 2874' 2674' 4930 2270 :. . 14229' 9-5/8" 14229' 8701' 6870 4750 Production linp.r 990' 5-1/2" 13980' - 14970' 8560' - 9100' 7740 6280 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: I Tubing MD (ft): 14606' - 14650' 8912' - 8936' 4-1/2", 12.6# L-80 13973' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker packer Packers and SSSV MD (ft): 13924' , 4-1/2" Otis SSSV Nipple 2114' ./ 12. Attachments: 13. Well Class after proposed work: !HI Des~ription Su~mary of Proposal 0 BOP Sketch 0 Ex lorator !HI Development 0 Service 0 Detailed Operations Program p y 14. Estimated Date for / ) 15. Well Status after proposed work: Commencing Operations: DecembE)f 23) 2003 0 Oil 0 Gas 0 Plugged !HI Abandoned 16. Verbal Approval: Dat~,.r 0 WAG 0 GINJ 0 WINJ 0 WDSPL Com mission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Neil Magee, 564-5119 Printed Name Bill Isaacson Title Senior Drilling Engineer I Prepared By Name/Number: Signature LJ.11-. ^. ~k(;L Phone 564-5521 Date 11//1/63 Terrie Hubble, 564-4628 , Commission Use'Cnly "" ",' , " ' I Sundry Number: 3 iJ 3 -3cf"O Conditions of approval: Notify Commission so that a representative may witness ( 0 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance RECEIVED Other: DEC 1 82003 S b t Ç> . d 1 0 ¡ " () 7 Alaska Oil & Gas Cons. Commission u sequen .orm require -.... Anchorage Original Signed By BY ORDER OF ! :J / '"\ ~ £í'7 Approved By: Sarah Palin COMMISSIONER THE COMMISSION Date /' !TJ';X9¿1 J Form 10-403 Revised 2/2003 U r) f G , N A" t. Sutfmit In Duplicate ~~[PIrlt X1Jft' 12 Z:/,Ilni,'i ~\ j" fii~\¡~~~[¡! ,J~Q~~ 2 @ 2004 lREE= 4-1/16" FMC.I ~ I W8..LHEAD= FMC '\ Z 30 /' S NOTES: ACTUATOR = BAKER - KB. 8..EV = 88.66' BF.-8..EV = 52.01' ~,....~.~_.>...........--......................-.__..............................-.._.~......, ~~~..~...................,...........,..,..,.............~.~g~.', 2114' -i4-1/2" OTIS SSSV NIP, ID = 3.813" 1 Max Angle = 60 @ 14825' 8 Datum MD = 14727' ....'-"'"'""""',-""'"''''-'''''''--''''''''','''''..._n........''',.m......,........,... Datum 1VD = 8800' SS GAS LIFT MANDR8..S I I ST MD 1VD DEV TYÆ VLV LATCH PORT DATE 13-3/8" CSG, 68#, L-80, ID = 12.415" 6 3398 2891 55 MERLA RK 5 8298 5506 56 MERLA RK 4 10881 6882 58 MERLA RK Minimum ID = 3.725" @13961' 3 12290 7614 56 M'ERLA RK II 2 13308 8116 59 MERLA RK 4-1/2 PARKER SWN NIPPLE 1 13889 8422 57 MERLA RK / Collapsed Tubing at 13,864' MD -i4-1/2" PARKER SWS NIP, ID = 3.813" I -i 9-5/8" X 4-1/2" BKR, PKR I -i4-1/2" PARKER SWS NIP, ID = 3.813" 1 -14-1/2" PARKER SWN NIP, ID = 3.725" I 14-1/2 "TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I ....J4-1/2" WLEG, ID = 3.958" I I TOP OF 5-1/2" LNR I l-f 8..MD TT LOGGED 08/12/921 I 9-5/8" CSG, 47#, L-80, ID = 8.681" I PERFORA TION SUMMARY REF LOG: HLS BHCS ON 03/03/90 ANGLE AT TOP PERF: 56 @ 14606' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 14606 - 14622 0 03/11/90 3-3/8" 4 14634 - 14654 0 03/11/90 3-3/8" 4 14668 - 14684 0 03/11/90 3-3/8" 4 14688 - 14735 0 03/11/90 3-3/8" 4 14745 - 14764 0 03/11/90 3-3/8" 4 14773 - 14795 0 03/11/90 3-3/8" 6 14580 - 14650 0 04/17/91 I PBTD I 15-1/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892" 1 DA TE REV BY COMMENTS DA TE REV BY COMMENTS PRUDHOE BAY UNIT 03/11/90 DFF ORIGINAL COMPLETION WELL: 2-30 02/04/91 RWO RECOMPLETION PERMIT No: 1900230 03/08/01 SIS-QAA CONVERTED TO CANVAS API No: 50-029-22013-00 03/14/01 SIS-MD FINAL SEC 19, T11 N, R12E, 714' FNL & 3648' FEL 05/19/01 RNlTP CORRECTIONS BP Exploration (Alas ka) Z-3~rl Proposed Com~.etion ÃëTDAfõÆ;-"'''''''"'''-''----SA-KËR KB. ELEV = 87.6' n.m.....uno' .m... mum.m" - . , _nm" ""'52~61i BF. E1...EV = 'î<ÖÞ = '""-''"'''''"''''''-'-'''^'-''~-~-'13428' 'Miix'Angië',;,n' ,'" 92"@"1(3'föõï 2875' 13-3/8", 68#, L-80 Datum MD = ---,,'"---- ~._.""-'-~,-~,,~~,~,""''',,~-" ~'T~"..'~"'-~--~~ "'------ -"~',,~, DatumlVD = 14-1/2" 'X' nipple at 2200' MD I GLM Design: #5 - ????' TVD - 4-1/2" X 1-1/2" 4-1/2", 12.6#, 13Cr-80, Tubing #4 - ????' TVD - 4-1/2" X 1-1/2" #3 - ????' TVD - 4-1/2" X 1-1/2" #2 - ????' TVD - 4-1/2" X 1-1/2" #1 - 1 jt above packer - 4-1/2" X 1" 13,250' 9-5/8" X 7" HMC Liner Hanger with ZXP /' Liner Top Packer and C2 Running Tool Top of Tubing Tail: Window at -10' Pup Joint 13,400' -X Nipple (3.813") -2 x 10' Pup Joint 7" X 4-1/2" S-3 Permanent Packer @ 13,940' -Packer -2 x 10' Pup Joint 7" X 4-1/2" HMC Liner Hanger with ZXP Liner -X Nipple (3.813") BP set at -2 x 10' Pup Joint 13,420' / Top Packer and C2 Running Tool @ 14,000' -XN Nipple (3.725") -10' Pup Joint 11',26#, L-80, BTC-M @ 14,092' I -WLEG 13,924' 14,229' 9-5/8", 47#, L-80 4-1/2", 12.6#, L-80, IBT-M Slotted Liner @ 16,890' 14,961' ~ 5.5", 17#, L-80 Date Rev By Comments PRUDHOE BAY UNIT 12-15-03 NM Proposed Completion Design - P6 WELL: Z-30A API NO: 50-029-22013-01 Permit No: GPB Rotary Drilling MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner DATE: April 21, 2001 THRU: Tom Maunder, P. I. Supervisor FROM: Lou Gdmaldi, SUBJECT: Petroleum Inspector SVS Tests BPX Z-pad Prudhoe Bay Field Sat.urday, April 21, 2001; I witnessed the three-month SVS retests on BPX Z pad in the Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (one SSV Failure) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. This was the first experience I have had with the new SV control system on Z pad and found it to operate quite well; The temperatures today were somewhat mild (+15) and it remains to ~-be seen-how-they will. hold up dudng next winter's cold season; Wells z.5 and Z-8had Sl°W-;cloSing SSV's (+ 2 minutes), Merv called the Automation crew and these were being worked on before I left the pad. The pad is being used as a staging area for some pipeline fabrication and has some equipment and material stored on it. This was kept for the most part neat and orderly. SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay 'Field. 20 wells, 40 components, Onefail'ure,- 2;4 % 34 Wellhouse inspections, no problems. Attachmen.ts: SVS PBU Z pad 4-21-01 LG.XLS NON-CONFIDENTIAL SVS PBU Z pad 4-21-01 LG Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Lou Grimaldi , , , ,, Submitted By: Lou G. Date: Field/Unit~ad: Prudhoe Bay F!eld, Z,pad Separator psi: LPS 159. HPS ., Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GENJ, Number Number PSI PSI Trip Code Code. Code , Passed GAS or, CYCLE Z-01' ' 188066'0. I'~9 ' '125 125 P P Z-02A 1960430! , .. Z-03 ..... 1971310: 159! '125 115 'P" P ....... z-04 " 1891230 " ' z-05 , '1900780'"," '159 ,'!25 155 ..P 'P ," ' ," ' . ..... z-o6 1880320' 159 125 125 P e Z'07A 1931100 Z-08A ' ' '1931'280' "159 ..... 1'25 i 3~j P P .... ~:09 ....... 18~0850 ..... , .... Z-10 1891160 , , .......... Z11 1900720 159 'i25 12~ P P z-12 1891020 ....... , .... z-13 1900940 1'59 125 '12~ 'P P Z-14A 1980510 , . ...... , , Z-15 1880880 'Z'i'~' 1920120 '159 ' ' 125 ' 125 P P z-17 1891390 1591 125 125 P P Z-18 1890960 .., z-19 1920230 , ,, Z_ o ' ' '188'i0oo ..... , Z-21 18904~20 159 1'2'5 125 'P 'P ............ Z-2~B ' i~60350 ' 159 125! ' .115 .... e P Z-23A i950430 159 125 'i25 P P Z-24 1890180 159 125 i'25 P ' :4 ~,d:~'.~ ~ ¥-~\~ /kD , z-2~' 18'81'~J0 ' 159 125 "i25 P e , , , Z-26 1890520 "159 125 125 P P Z'2~' 190'0510 "159 125 125 ~ P P ' Z-28. 1881270 , , , Z-29 ' ' 1890650 ' 159 1'2~' 120 P P ~ , , Z-5o ...... i900230 159 i2~ 120 "' P P z-31 1881120 Z-'3'2B 1970340 · 1'59 125 ' 125 P ' P ..... , 'Z_33A ' "1890050! ' , .. z-35 1980930: z-38 "~ 1980600 .... 159 ' 125 ' '1'20 ' P P RJF 1/16/01 Page 1 of 2 SVS PBU Z pad Well Number Wells: Permit Number 20 Remarks: · II I I I . , I U~ Separ Set PSI PSI Components: Trip ] Code ]CodeI Code Passed 40 Failures: 1 Failure Rate: Oil, WAG, GIN& GAS or CYCLE 2.50% I~ 9o Day · - .,Z, 75 & 8 ,L,°.,ng closure t',anes on sSV.. ...... . . . RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG MEMORANDUM State of Alaska · Alaska Oil and Gas Conservation Commission TO: Julie Heusser Commissioner DATE: January 23, 2001 THRU: FROM: Tom Maunder, ~.~~~ P. !. Supervisor o~1~-o\ Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Z-Pad .Friday, JanUa.ry.. !9. 200!' I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system'testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOGCC Safety. Value System Test Report indicates I witnessed the testing of 21 wells and 43 components with 6 failureS. The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.). The SSV on well Z-18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired except th® slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenance crew to perform the work. Wellhouse inspections were conducted on the 21 wells tested with no exceptions noted. Summa~: I witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13.9% failure rate. 21 wellhouse inspections conducted. ,A,, ttachme~nt: SVS PBU Z Pad 1-19-01 JJ Alaska Oil and Gas Conservation CommiSSiOn Safety Valve System Test Report Operator: BPX Operator Rep: Mew Lid&low AOC~C Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/pBU/Z'Pad Date: 1/19/01 Separator psi: LPS 159 HPS """ ,, ',i ' '~ ~ -' ' h '- ',' i ,,, ,, ,, ,- ' i , , i ,", "', ~, '-,, ..... ,'."'t-', ,,,, .... ~::~'~:i"~'~"?'::-'' L---.: :--~:~:::--..,:'-..': ::;:=~,=~=:-.:-'~-;'-:'-".-.~,...." .:-:::~.,-.-.'.-: WeB' Permit Separ -' Set L/P Test Test Test Date Oil, WAG, Ol~J. Number Number PSI PSI T, rip Code Code Code Passed GAS or CYCLE -- i i i i z-01 18~o~6o 'i~9, 125 125 P ' ' OIL p i _Ill Z-02A 1960430! }E-'03 ' 1971'~10 "15~'1' '125 0 ' 1 P ' OIL Z-04 18912301 Z-os "1'900)801 159 125 120 P P OIL Z-06 1880320! Z-07A 1931100' '~;'-08A i931280: 1~9 125 ..... 0 2 .... 43 - '1)25/bi - 6XL Z-09 ' '1890850' - .......... ...... - Z-10 1891160: Z:I 1 ' 1900720 .... i5~' ' i'25! '125 ' P ' P ..... 0IL Z-12 1891020 Z-13 1900940 159 125 125 P P OIL Z-14A 1980510 Z- 15 1880880 Z-16 1920120' 159 i'25 "' .125 P V OIL Z-17' '18913'90 "i59 '12S!' ' ']5~ P 'P · OIL z-18 i89/)960 ' 'i59' i25 120 P '43 ..... i~I'L Z-19 1920230 Z-20 . 1881000 · Z-21 "- 1890420 ..... ' .................... Z-22B 1960350 159 125: .125 P 4 OIL Z-23A 19~'0430 ..... -Z-24 1890180 .' ..... 159 125,' 130 P 4 Z-25 1881590 159. 125 '125 P P OILi ~Z-26'" · 1890~20 159 .... i25 ..... ~25 .... ? ' ? O~L Z-27 190~310 '" 159 15~ 125' '~ L, p ........... OiL, ,Z-28 _ ~88'1'27'9 .... ',, , ' ............. Z-29 1890650 . 1,,5,9, - .1~'5 120 ~" P ...... OIL , Z-30 _ 1900230 ,, 159 125 i'15', P P 0IL Z-31 1881120 Z-32B 1970340 159 125 125 P P OIL Z-33A 1890050 " 2750 2600 2500 P P P GINJ Z-35 1980950 159~ 125 120 P P 'OIL 1/24/01 Page I of 2 SVS PBU Z Pad 1-19-01 JJ.xls Well Permit Separ Set L/P Test Test Test Date cra, WAG, G~NJ, Number Number PSI PSI Trip Code I Code Code passed CaSorCYCLE I I I I I! Illl I I I I _ I I I I1 I. I I I I II II _l Z-38 1980600 159 125 120 ~P P OIL · Wells: ~. 21 Components: 43 Failures: 6 Failure Rate: 13.9°/d~!9o - -- _ i _1 . i i i . Remarks: ZT08A. SSV f..~. ed..;..1..2 .minute close, Z-1 s ssv failed: 15 ,,n~,', ute close, ~ozen pilot . thawed & passe~l,, ,r,e,,t~: ..... _ _ : .............. 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501 . Date: 29 September 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION O~~~/W~-42 (23-17-11-14) 1 CCL FINAL BL+RF 0 . -16 1 PLS FINAL BL+RF _ 9 /.< z-30 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1-PLS FINAL BL+RF Run # 1 . Run # 1 Run # 1 Run # 1 Run # 1 Run ECC No. 3539.02 5928.03 6135.02 6237.02 6486.00 6487.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 [~LE/V , ka ot STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS~. _~,~1 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate . Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 714' SNL, 3648' WEL, SEC. 19, T11N, R12E At top of productive interval 771'SNL, 4775' WEL, SEC. 07, T11N, R12E At effective depth 494' SNL, 4696' WEL, SEC. 07, T11N, R12E At total depth 419'SNL, 4735' WEL, SEC. 07, T11N, R12E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 14970' feet 9100' feet 14885' feet 9058' feet Plugs (measured) Junk (measured) 6. Datum elevation (DF or KB) KBE=88.66 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-30(11-07-11-12) 9. Permit number/approval number 90-23 / 10. APl number 50- 029-22013 11. Field/Pool Prudhoe Oil Pool Casing Length Size Structural -- Conductor 110' 30" Surface 2844' 13 3/8" I nte rmediate 14199' 9 5/8" Production -- Liner 990' Perforation depth: measured Cemented Measured depth True vertical depth BKB 147 147 4009 cu fl Permafrost 2874' 2674 3209 cu ft C/ass G 14229' 8701 5 1/2" 431 cu ft C/ass G 13980-14970 8561-9101 14606'-14622', 14634'-14654', 14668'-14684', 14668'-14735', 14745'-14764', 14773'-14795' Tubing (size, grade, and measured depth) 4-1/2" 12.6#L-80 to 13973' ~UPo 3 0 '[995 Packers and SSSV (type and measured depth) 9-5/8" Baker Packer@ 13924',SSSV@2114' ~ -,~ ~[[ & Gas Cons. ..... --, ~chorage, 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 402 703 558 2530 286 659 1373 954 2500 271 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby (;:ertify that the forej;l,oing is true and correct to the best of my knowledge. Signed L"-~//t~~,~- "~-- /~/ ~///4~ r~; Title Senior TechnicalAssistant ll Form 10-40'4 Rev 06/15/88 ~ Date SUBMIT IN DL~PLI(~ATE 9/30/94 11/27/94 WELL Z-30(11-07-11-12) Stimulation Operation A HCL tubing wash treatment was performed to remove scale using the following fluids: JOB SUMMARY Well was SI at 0400 hrs. Killed well with 235 BBLS SW with 0.2% NE-41 surfactant, followed by 15% HCL / 10% Xylene pumped at 1.6 bpm to allow 15 min contact time. Displaced well with 176 BBLS diesel to prevent overbalanced condition in wellbore. 235 24 176 FLUID SUMMARY Bbls Seawater with 0.2% NE-41 surfactant Bbls 15% HCL/10 % Xylene Bbls diesel A bullhead Scale Inhibitor was performed using the following fluids: 115 50 350 187 212 Lift gas FLUID SUMMARY Bbls Sw with 1.25% GS-6 and 2 GPT NE-18 Bbls SW with 50 ppm GS-6 and 2 GPT NE-18 Bbls SW with 7.5% ESL-19P Bbls SW with 50 ppm GS-6 and 2 GPT NE-18 Bbls SW displacement to perfs Displacement the remaining distance. STATE OF ALASKA ALA;sKA OIL AND GAS CONSERVATION COMMISS~,..,'N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X 2. Name of Operator Pull tubing Alter casing Repair well 5. Type of Well: Other ~ ' 6. Datum elevation (DF or BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 714' SNL, 3648' WEL, SEC. 19, T11N, R12E At top of productive interval 771'SNL, 4775' WEL, SEC. 07, T11N, R12E At effective depth 494'SNL, 4696' WEL, SEC. 07, T11N, R12E At total depth 419'SNL, 4735' WEL, SEC. 07, T11N, R12E 12. Present well condition summary Total depth: measured true vertical Development Exploratory Stratigraphic Service RECEIVED MAR 1,5 199; Alaska 0il & Gas Cons. Commissio~ Anchorage 14970'feet Plugs (measured) 9100'feet KBE=88. ,6'~{e,~t 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-30(11-07-11-12) 9. Permit number/approval number 9O-23/ 10. APl number 50- 029-22013 11. Field/Pool Prudhoe 0il Pool Effective depth: measured true vertical 14885'feet Junk (measured) 9058'feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth . _ BKB 110' 30" 147 147 2844' 13 3/8" 4009 cuft Permafrost 2874' 2674 14199' 9 5/8" 3209 cuft Class G 14229' 8701 measured .. 990' 5 1/2" 431 cu ft Class G 13980-14970 8561-9101 14606'-14622', 14634'-14654', 14668'-14684', 14668'-14735', 14745'-14764', 14773'-14795' truevertical subsea8824'-8832~8839'-8850~8857'-8866~886858893~889858908~891358924' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 to 13973' Packers and SSSV (type and measured depth) 9-5/8" Baker Packer@ 13924',SSSV@2114' 13. Stimulation or cement squeeze summary 4/17/91 AddPerf performed using 3 3/8" guns ,6SPF, random orientation and 60°phasing. 5/13/91 Hydraulic Fracture Treatment was performed using the following fluids: Intervals treated (measured) 14580'-14650' 50 bbl lO#gel est rate, 100 bbls S.I, 317bbl lO#gel to flush hcl, 69 Treatment description including volumes used and final pressure bb150# gel prepad to est rate, 1730 bb150# x-link gel pad, 956 bbl 50#x-link gel w/24600#16/20 cl, 148 bbl diesel, 601 bb150# gel 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 960 1001 35 1108 2560 2797 140 1560 Tubing Pressure 259 306 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~'AOjv~ '~.,.~ ~')- '~~,, Title Senior TechnicalAss/stantl Form 10-404 ~ev 06/15/88 ! Service Date SUBMIT IN DUPLICATE~'-...~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 09/12/92 T# 83889 BP CASED HOLE FINALS Enclosed is your copy of the materials listed questions, please contact BP Well Records at 5 " R-08 ~/'V T,EAK DET ~-1o3/'73 STATIC W-01 ~-;~7 CCL 5 " Z-0~/[~ ~ JEWELRY5 " z-30 ~$~ JEWELRY ~ 5 " 08/16/92 08/13/92 08/09/92 #1 08/15/92 #1 08/15/92 #1 08/11/92 #1 08/11/92 08/10/92 08/12/92 below. If you have any (907) 564-4004. #1 9900.00-10110.00 CAMCO #1 10950.00-11301.00 CAMCO 10200.00-11124.00 CAMCO 5 " 9700.00-10400.00 CAMCO 5 " 10100.00-10460.00 CAMCO 5 " 11500.00-12416.00 C~MCO 5 " #1 10190.00-11638.00 CAMCO #1 8750.00- 9604.00 CAMCO #1 12800.00-14637.00 CAMCO Information Control Well Records Shirley Hale RECEiVED SEP 1 8 1992 Alaska 0il & Gas Cons. Commission Anchorage ALAS,,~ OIL AND GAS CONSERVATION COMMISSI(.,,~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing ._~ 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Stimulate Plugging Perforate Alter casing Repair well Other X Workover Completion 4. Location of well at surface 714' SNL, 3648' WEL, SEC. 19, T11N, R12E At top of productive interval 771'SNL, 4775' WEL, SEC. 07, T11N, R12E At effective depth At total depth 419'SNL, 4735'WEL, SEC. 07, T11N, R12E 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 88.66' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number z-30 (11-07-11-12) 9. Permit number/approval number 9O-23 10. APl number 50- 029-22013 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical 14970'MD feet Plugs (measured) 9100'TVD feet BKB Effective depth: measured true vertical 14885'MD feet Junk (measured) 9058'TVD feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length 30" 2844' 14199' 990' measured Size Cemented Measured depth 110' 13-3/8" 4009 cu fl Permafrost 2874' 9-5/8" 3209 cu fl Class G 14229' True vertical depth BKB 110' 5-1/2" 431 cu ft Class G 13980'-14970' 14606'- 14622', 14634'- 14654', 14668'- 14684', 14688'- 14735', 14745'- 14764', 14773'- 14795' true vertical subsea 8824'-8832', 8839'-8850', 8857'-8866', 8868'-8893', 8898'-8908', 8913'-8924' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 to 13973' Packers and SSSV (type and measured depth) 9-5/8"BakerPacker@13924',SSSV@211~'~.~ 13. Stimulation or cement squeeze summary Waiting on stimulation Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Re.Dresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mc, Water-Bbl Casing Pressure 620 - 20 970 Tubing Pressure 26O 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed/~.,,.~.~'~ ~ ~~~ Title CompletionEnginoorin~Suporvisor Form 10-404 Rev 06/15/88' ~ SUBMIT IN DUPLICATE BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRI. IDHOE BAY UNIT As of 0600 Hrs. Wednesday, January_ 23, 1991 WELL: Z-3O (11-07-11-12). Rig: Doyon Rig #16 Day: 1_ Expense AFE Number: Expense AFE Amount = 145034 $688.000 Current Field Costs = Estimated Final Cost = $93,8O7 Current Operation: RIH. Summary_ of Last 24 Hours Circulate well. NU BOP and test. Pull 3-1/2" tubing. RIH to fish tubing stub. Reviewed By' '"'¢$~ Rrr, CEJ /£D Alaska Oil & Gas Oor~s. Anchorage BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, January_ 24, 1991. WELL: Z-3O (11-07-11-12) Rig' Doyon Rig #16 Day: 2 Expense AFE Number: Expense AFE Amount = 145034 .$688,000 Current Field Costs = Estimated Final Cost = $122,610 Current Operation: POH. Summary of Last ~4 Hours RIH, recover stub and SBR. RIH, release slick stick. POH. Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Friday. danua~ 25, 1991 WELL: ,.Z-3O (11-07-11-12) PRUDHOE BAY UNIT Rig: D0y,,0n Rig #16 Day: 3 Expense AFE Number: Expense AFE Amount = ..1 45034 Current Field Costs = Estimated Final Cost = Current Operation: POH for mill. Summary_ of Last 24 Hours Recovered slick stick. RIH and mill packer. POH for new mill. Reviewed By:~;~~-~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, January 28, 1991 WELL:- Z-30 (11-07-11-12) Rig' D0yon Rig #16 Day: 6 Expense AFE Number: Expense AFE Amount = 145034 Current Field Costs = Estimated Final Cost = Current Operation: Make up overshot. Summary_ of Last 72 Hours RIH with mill and PRT. Tag at 13,981'. Mill on packer, no progress, POH. RIH with packer shoe, mill on packer, POH. RIH with new packer shoe. Tag fish at 13,984', reverse circulate, mill on packer and POH. Lay down shoe, MU overshot. Reviewed By: ";:~ ,/ · BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Wednesday, January,,30. 1991 WELL: Z-3O (11-07-11-12), Day: 8 Expense AFE Number: Expense AFE Amount = 145034 PRUDHOE BAY UNIT Rig: Dgyon Rig #16 ,, Current Field Costs = Estimated Final Cost = Current Operati,,0n: Waiting on weather. Summary of Last 2~4 Hours POH. Slow recovered fish. RIH 8-1/2" bit and 9-5/8" scraper to linertop at 13,961'. Reverse circulate. High winds, waiting on weather. Reviewed By: '~' BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHQE BAY UNIT As of 0600 Hrs. Thursday, January 31, 1991 WELL: Z-30 (11-07-11-12) Rig- DQyon Rig #16 Day: 9 Expense AFE Number: Expense AFE Amount = Current Field Costs = Estimated Final Cost = Current Operation' POH to run test packer. Summary_ of Last ~4_ Hour~ Pump pill. Wait on weather (high winds). POH. Reviewed By: ,, '~/~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Fdday, Fgbruary 1. 1991 WELL: .Z-30 (11-07-1,!-1.2,). PRI. J, DHOE BAY UNIT Rig: Doyon Big i#16. Day: 10 Expense AFE Number: Expense AFE Amount = 145034 Current Field Costs = Estimated Final Cost = Current Operation' RIH 4-3/4" mill. Summary of Last 24 Hours Run 5-1/2" test packer. Tested casing and lap to 3000 psi, ok. RIH 4-3/4" mill. Reviewed By: f~"~'~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHQE BAY UNIT As of 0600 Hrs. Monday, February 4, 1991 WELL: Z-30 (11-07-11-12), Rig: Doyon Rig #16 Day: 13 Expense AFE Number: Expense AFE Amount = 145034, Current Field Costs = Estimated Final Cost = Current,Operation' Rig released at 0600 hrs on 2/4/91. Summary of Last 7~ Hours RIH. Reverse circulate. Run tubing, space out and land tubing. Install two-way check. Nipple down BOP. Nipple up and test tree. Puli two-way check valve. Pull BV dummy. Set plug. Set packer. Freeze protect well. Release rig at 0600 hrs on 2/4/91. Reviewed By :~z~___ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date:04/22/91 T#:82355 FROM' ,. SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS EncloSed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-12 E-21 E-21 0-.23 z-oo Production Log 04/16/91 #1 8794-9388 Sch 5" Tubing Cutter 04/17/91 #1 9200-10440 Sch 5" Peal 04/15/91 #1 10180-10590 Sch 5" Perf 04/17/91 #1 9000-9500 Sch 5" Completion 04/17/91 #1 13828-14738 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES ARCHIVES DATE: 04/02/90 T#: 81025 BP OPEN HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z-30 Mudlog 03/02/90 #- 14237-14970 NL Baroid R[ ¢EIVED. Alaska Oil & 6as Cons. CommissJ0~ Anchorage STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON MOBIL GEOSCIENCES ARCHIVES BP OPEN HOLE FINAL LOGS DATE: 03/23/90 T#: 80981 RE EIVED UAY ~ 1 199~~ ~.OIl.& 6~ Cons. domml~io. AnchOr~. Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Z-30 BCS 03/03/90 #1 14200-14932 HLS Z-30 DIL 03/03/90 #1 1420~14969 HLS Z-30 DSN 03/03/90 #1 ~0000-14932 HLS 2"/5" 2"/5" 2"/5" *** GEOS/ARCO/EXXON/ARCHIVES ONLY .... STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO 1. Status of Well Classification of Service Well OIL [] GAS r-! SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 90-23 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22013 4. Location of well at surface 9. Unit or Lease Name 714'SNL, E67[8'-F~EI_ SEC. 19, T11N, R12E ~ Prudhoe Bay Unit : 771'SNL,,~}WEL, SEC. 7, TI1N, R12E ~iI ~_ VE~:IFlS~ i Z-30(11-O7-11-12)PrudhoeBay Field/Prudhoe Bay Pool 419' SNL, ~~ SEC 7, T11N, R12E ~". ~ ~[ 5. Elevation in f~t (indite KB, DF, etc.) ~. Lea~ Designation and Serial No. KBE ='88.66' ~ ADL 47~0 ~12. Date ~udd~ 13~ Date T.D. Reach~ 14, D~e Comp., Su~. or Aband. ]15. Water Depth, if offshore ~16. No. of Completions 02-05-90 03-02-90 ' ~~ N/A feet MSL~1 one 17. Total D~th (MD+TVD) 18. Plug ~ck Depth (MD+~D) 19. Dir~tional Survey ~20. D~th where SSSV set ~21. Thickness of Permafrost I 14970'MD/9100'~D 14885'MD/9058'TVD ~ ~ ~ D 2122'feet MD ~ 1892' ~22. Type Electric or Oth~ Logs Run GR/SP/DI~BHCS/CNL 23. CASING, LINER AND CEMENTI~ R~ S~I~ D~ MD CASING SIZE ~. PER ~. ~DE ~ ~ ~E SI~ ~1~ R~RD A~UNT PULLED 30" Sudace 110' , , 13-3/8" 68~ L-80 Sudace 2874' 17-1/2" 4009 cufl Permafrost 9-5/8" 47~ NT80-S Sudace 14229' 12-2/4" 3209 cufl Class G 5-1/2" 17~ NT80-S 13980 14970' 8-1/2" ~1 cufl Class G ,,, 2~' Peri'rations open to Pr~uction (MD+TVD of T~ and BoSom and 25. ~1~ R~RD interval, size and number) SIZE DEP~ S~ (MD) PACKER S~ Baker3-3~8" ~ 4 spf 3-1/2" 9.2~ TDS 13982' 13905' MD . ~Dss 14606~ 14622' 8824 ~8832' 26. ACID, F~CTURE, CEM~ ~UE~E, ~C. 14~4~14654' 8~9~8850' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL ~ED 14668~14684' 8~7~8866' 13-3/8" X 9-5/8" Freeze Prot~t Annulus w/150 bbls 14688~ 14735' 8868~8893' 147~~ 14764' 8898~8908' D~ Crude 14~3~14795' 8913~8924' 27. PR~~ TEST Date First Production ~Method of O~ration (Flowing, g~ lift, etc.) .... ~ ~o ~ I Flowing Date of Test Hours Tested P~D~ ~ OIL-BBL ~S-MCF ~ATER-BBL ~E~ ]GAS-OIL ~TIO ~ST PERIOD ~ I Flow Tubing C~ing Pressure CALCU~TED~ OIL-BBL ~S-MCF ~ATER-BBL OIL G~VITY-API (corr) Press. 24-HOUR ~TE ~ 28. ~RE DATA Brief description of lithology, porosity, fractures, a~ent dips, and presen~of0il, gas or water. Submit corechips. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS FOR~,~[ ION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 14242' 8708' Shublik A 14302' 8742' Zone 4 14557' 8885' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed -~~~' '~t'~~/-~ TitlePBULeadEno_ineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, January 31, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day' -1 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Turnkey move. Summary of Last 24 Hours: Moving from Z-17 to Z-30 around the reserve pit. Wells Shut-in For Drill-By: Z-29, Z-31 MudType Mud Weight Viscosity .P V YP Fluid Loss Solids Temp #/gal Sec. cc °F Survey D. epth, Angle Direction N-S E-W ,Dog Leg TVD, Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hm. Thumday, February 1, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: -2 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 , Current Operation: Moving rig. Summary of Last 24 Hours: Turn key dg move. AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = , ,, Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Typ~ , Mud Weight #/gal Survey Deoth Anale Viscosity Sec. ,Direction TVD PV YP ~ Solids Temp cc °F Section Coordinate Coordinate °/100, Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hm. Friday, February 2, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day: -3 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 Current Operation: Move to Z-30. Summary of Last 24 Hours' Turn key dg move. APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Tvoe Mud Weiaht Viscosity #/gal Sec. P V YF' EJJ,tJ.~[_L.~,s~ Solids'l'em~) cc °F Survey Deoth Anale Direction 'I'VD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, February 5, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 ,,, Day: 1 Depth at 0600 Hrs. = 456 72 Hour Footage = 338 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Drilling 17-1/2" hole. Summary of Last 72 Hours: Accepted dg on Z-30 at 1800 hrs on 2/4/90. 456' MD. Drilled 17-1/2" hole to Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity p ¥. ~YP~ Spud 9.5 #/gal 195 Sec. 50 50 Fluid Loss Solids Temo 9.2 cc 6.5% 50 °F Angle Direction TVD N-S E,W Dog Leg Section Coordinate Coordinate °/100, Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, February 6, 1990 WELL: Z-30 (11-07-11-12) BaY UNIT159 RIG: ALASKA UNITED #2 Day: 1 Depth at 0600 Hrs. = 1,685 24 Hour Footage = 1,670 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling 17-1/2" hole. Summary of Last 24 Hours: Drilled 17-1/2" hole to 1685' MD. Wells Shut-in For Drill-By: Z-29, Z-31 , , Mud Type Mud Weight ..Viscosity P,V. SPUD 9.7 Cf/gal 140 Sec. 37 YP Fluid Loss Solids. 43 9.2 cc 7.5% Temp 65 OF Survey Depth Angle Direction T.VD 9 1,608 17.60 N10.4W 1,597 N-S ~-W Section ,Coo. rdi,nate Coordinate 95 N95 W13 Dog Leg °/1 o0: 2.10 Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, February 7, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 2 Depth at 0600 Hrs. = 2,890 24 Hour Footage = 1,205 AP! No. 50-029-220!3 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Circulating bottoms up. Summary of Last 24 Hours: Drilled 17-1/2" hole to 2890' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity P V Spud 10.4 Cf/gal 93 Sec. 32 YP Fluid Loss Solids 35 10.0 cc 11% Temp 58 OF Survey Depth Angle Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, February 8, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 3 Depth at 0600 Hrs. = 2,890 24 Hour Footage = 0 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs - Current Operation: Nipple up BOP's. Summary of Last 24 Hours: Ran and cemented 13-3/8" casing. Wells Shut-in For Drill-.By: Z-29 & Z-31 Mud Type Mud Weight Viscosity, .P V Gel Non Disp 9.6 #/gal 33 Sec. 9 YP. Fluid Loss Solids 3 19.2 cc 7% Temp OF Survey Depth Angle. Direction TVD N-$ E-W Section. Coordinate Coordinate Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, February 9, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 4 Depth at 0600 Hrs. = 2,890 24 Hour Footage = 0 AP! No. 50-029-22013 AFE Number: 1 25136 AFE Amount = Current Field Costs = Current Operation: Run in hole. Summary of Last 24 Hours: Test BOP's. Pick up 12-1/4" BHA. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight ~ P V Lty Dispersed ---. 9.5 Cf/gal 34 Sec. 9 YR Fluid Loss Solids Temp 4 15.8 cc 7% °F Depth Angle Direction TVD N-S E,-W. Doa Lea Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, February 12, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 7 Depth at 0600 Hrs. -- 7,000 72 Hour Footage = 4,110 APl No. 50-029-22013 AFE Number: 1 25136 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 72 Hours: Drilled 12-1/4" hole to 7000' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity P,,V Dispersed 10.0 #/gal 37 Sec. 1 5 YR. Fluid Loss Solids Temp 9 6.4 cc 10% 82 °F Survey Depth Angle Direction. TVD N-S E-W Dog Leg Section. Coordinate ,Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, February 13, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 8 Depth at 0600 Hrs. = 7,885 24 Hour Footage = 885 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 7885' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity P V Dispersed 10.1 Cf/gal 38 Sec. 15 YP Fluid Loss .Solids Temp 1 1 5.8 cc 11% 82 °F Survey' Depth Angle Direction TVD 73 7,725 58.40 N11.1W 5,291 N-,.S E-W Dog Leg Section Coordinate Coordinate °/100' 4,807 N4775 W565 0.70 Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, February 14, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 9 Depth at 0600 Hrs. = 8,648 24 Hour Footage = 763 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Tripping out of hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 8648' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 .Mud Type Mud Weight Vis.c0sity .P V Dispersed 10.1 #/gal 42 Sec. 19 ,, YP Fluid Loss Solids Temp 1 2 4.8 cc 11% 90 °F Survey_ Depth Angle Direction TVD N-S E-W,. Dog Leg Section Coordinate Coordinate.. °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, February 15, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 1 0 Depth at 0600 Hrs. = 9,212 24 Hour Footage = 564 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled and surveyed to 9212'. Wells Shut-in For Drill-By: Z-29 & Z-31 ,, , .Mud Type Mud Weight Viscosity Dispersed 10.2 #/gal 43 Sec. P V YP Fluid Loss. Solids Temp 20 16 4.0 cc 12.5% 88 °F .Survey Depth Angle Direction N-S E-W D_~ TVD Section Coordinate Coordinate. °/100' Reviewed By: /~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Friday, February 16, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day: 11 Depth at 0600 Hrs. = 9,700 24 Hour Footage = 488 AP! No. 50-029-22013 AFl= Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours' Drilled 12-1/4" hole to 9700' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 ..Mud Type Mud Weight Viscosity P V Dispersed 10.4 #~gal 45 Sec. 23 YP Fluid Loss Solids 17 3.8 cc 13.5% Temp 90 °F Survey Depth,, A,ngle Direction TVD N-S E-W Dog Leg Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Monday, February 19, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day: 1 4 Depth at 0600 Hrs. = 11,300 72 Hour Footage = 1,600 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Drilling. Summary of Last 72 Hours: Drilled 12-1/4" hole to 11,300'. Wells Shut-in For Drill-By: , Mud Type Dispersed Z-29 & Z-31 Mud Weight Viscosity 10.4 Cf/gal 46 Sec. .PV YP Fluid LOSS Solids Temp 17 12 4.5 cc 13.5% 98 °F Survey Depth Angle Direction TVD .N-S E-W DOg Leg .Section Coordinate Coordinate °/100' Reviewed By: /¢~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, February 20, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 1 5 Depth at 0600 Hrs. = 11,733 24 Hour Footage = 433 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Pull out of hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 11,733' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 , ..Mud Type Mud Weight Viscosity P V Dispersed 10.4 #/gal 43 Sec. 1 4 YP Fluid Loss Solids 11 4.8 cc 13.5% Temp 105 OF Survey Depth. Angle. Direction TVD N-S E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Wednesday, February 21, 1990 WELL: Z-30 (11-07-11-12) Day: 1 6 Depth at 0600 Hrs. = 12,005 24 Hour Footage = 272 PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 12,005' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 , , Mud Type Mud Weight Yis, cosity P V, Dispersed 10.4 #/gal 42 Sec. 13 ,YP Fluid L0s8 Solids Temp 1 0 4.6 cc 13.5% 101 °F ,Survey Depth An. gle .Direction TVD N-S E-W Doa Lea Section .Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, February 22, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 17 Depth at 0600 Hrs. = 12,290 24 Hour Footage = 285 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 12290' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud, Weight Dispersed 10.4 Cf/gal Viscosity P V 44 Sec. 1 6 YP Fluid L0s~. Solids 13 4.8 cc 14% ,,, Temp 92 °F Survey Depth Angle, Direction TVD N-S E-w Section .Coordinate, Coordinate, Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Friday, February 23, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 1 8 Depth at 0600 Hrs. = 12,550 24 Hour Footage = 260 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled 12-1/4" hole to 12550' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 .Mud .Type Mud Weight Viscosity P V Dispersed 10.4 Cf/gal 45 Sec. 17 Y__EP Fluid Loss Solids Temp 1 2 4.6 cc 14% 92 °F Survey Depth Anale ,Direction, TVD N-S ErW Dog Leg Section Coordinate Coordinate °/lOO' Reviewed By: '~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs, Monday, February 26, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 21 Depth at 0800 Hrs. = 13,730 72 Hour Footage = 1,180 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 72 Hours: Drilled 12-1/4" hole to 13730' MD. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Dispersed 10.4 #/gal Viscosity PV YP Fluid LOss Solids Temp 42 Sec. 15 1 2 4.5 cc 14% 95 °F Survey Depth Angle Directio. n N.S E-W, ~ TVD Section Coordinate Coordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday, February 27, 1990 WELL: Z-30 (11-07-11-12) Day: 22 Depth at 0600 Hrs. = 14,197 24 Hour Footage = 467 PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Reaming 12-1/4" hole. Summary of Last 24 HOurs: Drilled 12-1/4" hole to 14197'. Wells Shut-in For Drill-By:. Z-29 & Z-31 Mud Type Mud Weight Viscosity Dispersed 10.4 #/gal 46 Sec. Survey Depth An__ngJ.~ Direction TVD ,PV YP FIuid,L0ss, Solids Temp, 17 13 4.2 cc 14% 95 °F , , N-S E~W Doe Lee Section CQQrdinate Coordinate, °/1001. Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Wednesday, February 28, 1990 WELL: Z-30 (11-07-11-12) Day: 23 Depth at 0600 Hrs. = 14,237 24 Hour Footage = 40 Current Operation: Run 9-5/8" casing. Summary of Last 24 Hours: PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Drilled to 14,237'. L/D pipe. RU casing crew to run 9-5/8" casing. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Dispersed 10.4 #/gal Viscosity - 42 Sec. Survey Deoth Angle . .D. irection TVD P. V YP Fluid Loss Solids 15 11 4.2 cc 14% N-S E-W Section Coordinate Coordinate Temp 112 °F Do(~ Lea °/100, Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, March 1, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 24 Depth at 0600 Hrs. = 14,234 24 Hour Footage = 0 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation: Test IBOP. Summary of Last 24 Hours: Ran 363 joints 9-5/8" casing to 14229'. Cemented with 1576 sxs lead and 200 sxs tail. Did not bump plug. Wells Shut-in For Drill-By: Z-29 & Z-31 MudType Mud W~ight Viscosity P V YP Fluid Loss Solids Temp Dispersed 9.7 Cf/gal 36 Sec. 10 5 10.0 cc 7.5% 80 °F Survey Depth Angle Dire¢l;i0n N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, March 2, 1990 WELL: Z-30 (11-07-11-12) PRUDHOE BAY UNIT RIG: ALASKA UNITED #2 Day' 25 Depth at 0600 Hrs. = 14,418 24 Hour Footage = 189 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Drilling. Summary of Last 24 Hours' Drilled out cement to 14,111'. Tested 9-5/8" casing to 3000 psi. Drilled out float equipment. Lowered mud weight to 9.5 ppg. Drilled 8-1/2" hole to 14,418'. Wells Shut-in For Drill-By' Z-29 & Z-31 Mud Type ..Mud Weight Viscosity Dispersed 9.5 Cf/gal 35 Sec. .P .V YP Fluid Loss Solids Temp 10 4 6.0 cc 7% 82 °F Survey_ Depth Angle Direction N-S E-W Dog Leg _TVD Section Coordinate Coordinate °/100' Reviewed By: ~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Monday, March 5, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT , ~nchora~ ' RIG: ALASKA UNITED #2 Day' 28 Depth at 0600 Hrs. = 552 72 Hour Footage = 14,970 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' POH. Summary of Last 72 Hours' Drilled 8-1/2" hole to 14970'. Log. Ran and cemented 5-1/2" liner. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity Dispersed 9.5 Cf/gal 35 Sec. P V YP,. Fluid Loss Solids 9 7 5.6 cc 7% Temp,.. 96 OF Survey. Depth Angle, Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg °/100' Reviewed By' BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Tuesday, March 6, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day' 29 Depth at 0600 Hrs. = 24 Hour Footage = 0 14,970 APl No. 50-029-22013 AFE Number: 1 25136 AFE Amount = Current Field Costs = Current Operation' Drilling cement. Clean out liner. Summary of Last 24 Hours: RIH to clean out liner. Test casing to 3000 psi. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity P V Dispersed 9.5 #/gal 38 Sec. 14 ,.YP. Fluid Loss Solids 8 cc Temp oF Survey Depth Angle Direction TVD N-S, E-W Section Coordinate Coordinate Dog Leg 01100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, March 7, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 30 Depth at 0600 Hrs. = 14,885 24 Hour Footage = 0 APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs - Current Operation' Circulating. Summary of Last 24 Hours: Cleaned out liner. Wells Shut'in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity Dispersed' 9.4 If/gal 38 Sec. P V YP Fluid Loss .Solids 1 4 9 cc Temp 92 OF Survey Depth Angle Direction TVD N-$ E-W Section Coordinate Coordinate Dog Leg o/100'. Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, March 8, 1990 WELL: Z-30 (11-07-11-12) BAY UNIT RIG: ALASKA UNITED #2 Day: 31 Depth at 0600 Hrs. = 24 Hour Footage = 0 14,885' PBTD APl No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Logging. Summary of Last 24 Hours: Rig up and logging CBT/CET. Wells Shut-in For Drill-By: Z-29 & Z-31 Mud Type Mud Weight Viscosity NaCI 9.2 Cf/gal 26 Sec. PV Yp Fluid Loss Solids CC Temp oF Survey Depth Angle. Direction TVD N-S E-W Section Coordinate Coordinate Dog Leg 01100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, March 9, 1990 WELL: Z-30 (11-07-11-12) PRUDHOE BAY UNIT :'~ Ar~chora~.,~ RIG: ALASKA UNITED #2 Day: 32 Depth at 0600 Hrs. = 14,885 PBTD 24 Hour Footage = 0 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Circulating. Summary of Last 24 Hours' Finished logging Gyro/CCL. Drillpipe conveyed perforated 14,606' - 14,622', 14,634' - 14,654', 14,668' - 14,684', 14,688' - 14,735', 14,745 - 14,764' & 14,773' - 14,795'. Wells Shut-in For Drill-By' Z-29 & Z-31 Mud Type Mud Weight Viscosity P V .YP. Fluid Loss Solids Temp NaCI 9.2 #/gal 26 Sec. -. cc °F Survey Depth Angle DirectiQn N-S E-W Dog Leg. .TyD. Section Coordinate Coordinate °/100, Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, March 12, 1990 WELL: Z-30 (11-07-11-12) RIG: ALASKA UNITED #2 Day: 34 Depth at 0600 Hrs. = 0 72 Hour Footage = 0 AP! No. 50-029-22013 AFE Number: 125136 AFE Amount = Current Field Costs = Current Operation' Released rig at 2400 hfs on 3/10/90. Summary of Last 72 Hours' Ran 3-1/2" tubing. NU tree and tested to 5000#. Displaced well to diesel. Wells Shut-in For Drill-By: Z-29 & Z-31 MudType Mud Weight Viscosity p V YP Fluid Loss Solids NaCI 9.0 #/gal Sec. cc Temp oF Survey Depth Angle Direction TVD N-S E-W Section Coordinate Coordinate Dog Leg o/100' Reviewed By' ~y~ SUB. SURFACE DIRECTIONAl. SURVEY I~UIDANCE r~ONTINUOUS I-~IOOL Company BP EXPLORATION ... Well Name Z-30 t11-07-11-12)(714' SNL~3648' WEL,SEC 19,TllN,R12E) Field/Location PRUDHOE BAY~ NORTH .SLOPE~ ALASKA . Job Reference No. 73756 Lo(3{3ed By; WARNER ,i' lCit 0 FILM ED Date_ / 0/~. ,-7./©/~ Computed .... -~ KOHRTNG SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION Z-30 (11-07-11-12) PRUDHOE BAY NORTH SLOP~. ALASKA SURVEY DATE: 08-MAR-90 ENGINEER: HARNER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 5 DEG 54 MIN WEST COMPUTATION DATE: II-MAR-90 PAGE I BP EXPLORATION Z-30 (11-07-11-12) PRUDHOE BAY NORTH SLOPE9 ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88.66 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED 'VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH OEG -88.66 0 0 N 0 0 E 11.34 0 8 S 49 3 E 111.34' 0 7 N 25 4 W 211.34 0 15 S 34 26 E 311.34 0 16 S 3 29 E 411.34 0 13' S 0 21 E 511.34 0 20 S 30 41 E 611.33 0 34 S 32 30 E 711.33 0 33 S 15 40 E 811.32 0 28 S 32 35 E S 31 17 Id N 5 42 E N 6 22 Id N 12 56 Id N 143¢1,1 N 12 23 Id N 10 4 W N 8 51W N 9 23 Id N 9 12 W ENGINEER: WARNER 0.00 0.00 100.00 100.00 ZO0. O0 200.00 300.00 300.00 400.00 400.00 500.00 500'00 600.00 600.00 700.00 699.99 800.00 799.99 900.00 899.98 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/IdEST OZSTo AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG 1000.00 999.98 911.32 0 7 1100.00 1099.94 1011.28 2 56 1200.00 1199.61 1110.95 6 28 1300.00 1298.52 1209.86 10 4 1400.00 1396.52 1307.86 12 48 1500.00 1493.53 1404.87 15 14 1600.00 1589.41 1500.75 17 44 1700.00 1684.04 1595.38 19 50 '1800o00 1777.72 1689.06 20 59 1900.00 1870.80 1782.14 21 56 0.00 0.00 0.00 N 0.00 E 0.14 0.16 0.14 N 0.02 W O.ZZ 0.41 0.24 N 0.12 E 0.05 0.41 0.05 N 0.07 E -0.22 0.46 0.20 S 0.17 E -0.62 0.50 0.60 S 0.31 E -1.23 0.60 1.18 S 0.55 E '2.03 0.62 1.95 S 0.84 E -Z.82 0.35 2.71 S 1.19 E -3.78 0.39 3.63 S 1.64 E 2000.00 1963.14 1874.48 23 16 2100.00 Z054.18 1965.52 25 45 2200.00 Z143.23 2054.57 28 21 2300.00 2230.27 2141.61 30 40 2400.00 2314.46 2225.80 34 57 2500.00 2394.52 2305.86 37 57 2600.00 2473.64 2384.98 37 54 2700.00 2550.87 2462.21 41 20 2800.00 2623.5.4 2534.88 45 26 2900.00 2691.07 2602.41 49 19 -4.20 0.83 4.04 S -2.29 2.96 2.05 S 5.64 4.44 5.90 N 20.16 3.12 20.22 N 39.84 2.18 39.51 N 63.85 2.60 63.06 N 92°08 2.32 90.88 N 124.35 1.76 122.77 N 159.28 0.82 157.32 N 195.76 1.09 193.38 N 3000.00 2754.24 2665.58 52 21 3100.00 2813.30 2724.64 55 8 3200.00 2869.21 2780.55 56 23 3300.00 2924.64 2835.98 56 23 3400.00 2980.47 2891.81 55 46 3500.00 3036.82 2948.16 55 40 3600.00 3093.42 3004.76 55 24 3700.00 3150.19 3061.53 55 25 3800.00 3207.03 3118.37 55 16 3900.00 3263.45 3174.79 56 2 N 7 49 W 234.09 N 9 22 W 275.40 N t2 10 Id 320.68 N 11 49 W 369.61 N 11 19 W 423.27 N 11 5 W 482.89 N 10 45 W 543.82 N 10 18 W 607.10 N 10 5 W 675.56 N 9 48 W 749.10 N 9 40 W 826.43 N 9 32 W 906.94 N 9 24 W 989.68 N 9 21 W 1072.77 N 9 30 W 1155.57 N 9 33 W 1238.02 N 9 31 W 1320.30 N 9 25 W 1402.46 N 9 18 W 1484.59 N 8 47 W 1567.02 0.00 N 0 0 E O. 14 N 9 41 0.26 N 26 19 E 0.09 N 51 5 E 0.26 S 39 22 E 0.67 S 27 37 E 1.30 S 2.12 S 23 12 E 2.96 S 23 41 E 3.98 S 24 21 E 1.79 E 4.42 S 23 57 E 2.42 E 3.17 S 4.9 47 E 2.18 E 6.29 N 20 16 E 0.61 W 20.23 N 1 9 W 5.26 W 39.86 N 7 35 W 10.99 W 64.01 N 9 53 I/ 16.42 W 92.35 N 10 14 W 21.66 W 124.67 N 10 0 W 27.17 W 159.64 N 9 48 W 33.14 W 196.20 N 9 43 W 1.92 3.10 2.36 3.05 5.04 0.77 1.96 4.33 4.41 3.18 231.33 N 38.76 W 234.55 N 9 31 W 272.25 N 44.73 W 275.90 N 9 20 W 316.87 N 53.38 W 321.34 N 9 34 W 365.00 N 63.67 W 370.51 N 9 54 W 417.83 N 74.41 W 424.40 N 10 6 W 476.56 N 86.06 W 484.27 N 10 14 W 536.63 N 97.61 W 545.43 N 10 19 W 599.05 N 109.22 W 608.92 N 10 ZO W 666.62 N 121.35 W 677.58 N 10 19 W 739.24 N 134.06 W 751.30 N 10 17 W 2.89 2.37 0.44 0.05 0.32 0.24 0.39 0.33 0.34 0.76 815.63 N 147.13 W 828.79 N 10 14 W 895.17 N 160.60 W 909.47 N 10 10 W 976.95 N 174.21 W 992.36 N 10 7 W 1059.08 N 187.74 W 1075.59 N 10 3 W 1140.92 N 201.33 W 1158.55 N 10 0 W 1222'40 N 214.98 W 1241.16 N 9 58 W 1303.71 N 228.61 W 1323.60 N 9 57 W 1384.91 N 242.15 W 1405.92 N 9 55 W 1466.09 N 255.54 W 1488.19 N 9 53 W 1547.62 N 268.52 W 1570.74 N 9 51 W COMPUTATION DATE: 21-MAR-g0 PAGE 2 BP EXPLORATION DATE OF SURVEY: 08-MAR-90 Z-30 Cl1-07-11-12) KELLY BUSHING ELEVATXON: 88.66 FT PRUDHOE BAY NORTH SLOPEr ALASKA ENGINEER: gARNER INTERPOLATEO vALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVTATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/14EST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MTN 4000.00 3319.42 3230.76 55 44 4100.00 3375.56 3286.90 55 59 4200.00 3431.36 3342.70 56 12 4300.00 3486.72 3398.06 56 33 4400.00 3541.89 3453.23 56 28 4500.00 3596.80 3508.14 56 57 4600.00 3651.26 3562.60 56 56 4700.00 3705.54 3616.88 57 17 6800.00 3759.63 3670.97 57 19 4900.00 3813.82 3725.16 57 7 5000.00 3868.09 3779,.43 57 10 5100.00 3922.31 3833.65 56 59 5200.00 3976.87 3888-21 56 54 5300.00 4031.74 3943.08 56 37 5400.00 4086.33 3997.67 57 30 5500.00 4139.43 4050.77 58 17 5600.00 4191.31 4102.65 59 5 5700.00 4242.55 4153.89 59 16 5800.00 4294.06 4205.40 58 35 5900.00 4345.88 4257.22 59 I 6000.00 4397.44 4308.78 58 59 6100.00 4448.60 4359.94 59 29 6200.00 4499.81 4411.15 58 51 6300.00 4551.30 4462.64 59 19 6400.00 4602.18 4513.52 59 24 6500.00 4653.20 4564.54 59 29 6600.00 ~703.87 4615.21 59 27 6700.00 4754.58 4665.92 59 37 6800.00 4805.19 4716.53 59 40 6900.00 4855.77 4767.11 59 34 7000.00' 4906.63 4817.97 59 11 7100.00 4958.20 4869.54 58 55 7200.00 5'009.68 4921.02 58 58 7300.00 5061.53 4972.87 58 47 7400.00 5113.21 5024.55 58 37 7500.00 5166.02 5077.36 57 54 7600.00 5218.89 5130.23 58 24 7700.00 5270.92 5182o26 58 45 7800.00 5323.29 5234.63 57 53 7900.00 5377.18 5288.52 57 5 DEG MTN FEET DEG/IO0 FEET FEET FEET DEG HIN N 8 28 W 1649.81 N 8 35 14 1732.47 N 8 15 1,,I 1815.37 N 8 3 14 1898.59 N 7 56 N 1981.94 N 7 33 ~ 2065.47 N 7 19 ti 2149.31 N 7 25 I,/ 2233.27 N 7 28 14 2317.35 N 7 29 W 2401.36 N 7 34 W 2485.32 N 7 16 kl 2569.31 N 7 4 ~1 2653.10 N 6 46 W 2736.69 N 6 13 ~ 2~20.47 N 5 36 g 2905.20 N 5 33 14 2990.69 N 5 25 W 3076.56 N 5 29 W 3162.27 N 5 25 14 3247.80 N 5 10 ~ 3333.47 N 4 49 H 3419.38 N 4 54 ~ 3505.26 N 4 58 W 3590.97 N 4 55 ~ 3577.05 N 4 44 W 3763.04 N 4 34 W 3849.23 N 4 36 W 3935.40 N 4 38 W 4021.62 N 4 37 ~ 4107.87 N 4 36 W 4193.94 N 4 27 W 4279.59 N 4 9 14 4365.29 N 4 38 W 4450.76 N 6 19 W 4536.37 N 7 13 14 4621.27 N 9 36 W 4706.08 N 11 43 W 4791.14 N 11 19 W 4875.91 N 1Z 4 W 4959.75 0.8.3 0.50 0.53 0.24 0.23 0.50 1.02 1.00 0.34 0.24 0.84 0.61 0.36 0.32 1.56 0.92 0.32 0.16 1.16 0.62 0.37 0.71 0.62 0.30 0.57 0.60 0.65 0.20 0.26 0.47 0.80 0.73 0.51 1.80 2.04 0.73 3.17 0.55 1.19 2.06 1629.57 N 280.88 W 1653.59 N 9 47 14 1711.40 N 293.14 W 1736.33 N 9 43 1793.49 N 305.30 14 1819.29 ~N 9 40 14 1875.93 N 317.06 Id 1902.54 N 9 36 1958.53 N 328.66 14 1985.91 N 9 32 2041.34 N 339.91 ~ 2069.45 N 9 ZT ti 2124.52 N 350.73 14 2153.27 N 9 22 ti 2207.81 N 361.45 14 2237.20 N 9 18 2291.21 N 372.36 Id 2321.27 N 9 14 ti 2374.55 N 383.24 14 2405.27 N 9 10 W 2457.81 N 394.27 Id 2489.23 N 9 7 14 2541.13 N 405.10 14 2573.22 N 9 3 14 2624.29 N 415.53 14 2656.98 N 9 0 14 2707.28 N 425.59 W 2740.53 N 8 56 14 2790.52 N 435.09 W 2824.24 N 8 52 W 2874.82 N 443.76 ~1 2908.87 N 8 46 ti 295,9.90 N 452.03 W 2994.22 N 8 41 W 3045.39 N 460.22 W 3079.97 N 8 36 ti 3130.71 N 468.36 14 3165.55 N 8 31 14 3215.85 N 476.50 bl 3250.96 N 8 26 ti 3301.17 N 484.38 ti 3336.52 N 8 21 g 3386.76 N 491.83 ti 3422.29 N 8 16 ti 3472.35 N 499.07 ti 3508.03 N 8 11 W 3557.76 N 506.45 W 3593.63 N 8 6 ti 3643.53 N 513.88 W 3679.59 N 8 2 W 3729.23 N 521.06 Id 3765.46 N 7 57 N 3815.16 N 528.05 t,I 3851.53 N 7 53 W 3901.08 N 534.91 t,I 3937.58 N 7 48 g 3987.04 N 541.83 ~/ 4023.69 N 7 44 ti 4073.03 N 548.76 ',t 4109.83 N 7 40 ti 4158.85 N 555.69 g 4195.81 N 7 37 14 4244.26 N 562.45 W 4281.36 N 7 33 4329.75 N 568.82 I,/ 4366.96 N 7 29 ti 4415.03 N 575.16 g 4452.33 N 7 25 W 4500.23 N 583.43 t,/ 4537.89 N 7 23 14 4584.56 N 593.42 kl 4622.80 N 7 23 4.668.57 N 605.49 W 4707.67 N 7 23 4752.41 N 621.66 I,I 4792.90 N 7 27 4835.87 N 638.74 g 4877.87 N 7 31 14 4918.43 N 655.48 I,I 4961.91 N 7 35 ti CDHPUTATION DATE: II-MAR-90 PAGE 3 BP EXPLORATION Z-30 (11-07-11-12) PRUDHOE BAY NgRTH SLOPEr ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88.66 FT ENGINEER: gARNeR INTERPOLATED VALUES FOR EVEN 100 FEET OF HEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZINUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG 'MIN 8000.00 5431.41 5342.75 57 10 8100.00 5485.83 5397.17 56 56 8200.00 5540.63 5451.97 56 28 8300.00 5596.18 5507.52 56 6 8400.00 5652.22 5563.56 55 42 8500.00 5708-87 5620.21 55 20 8600.00 5766.08 5677.42 5'4 49 8700.00 5823.85 5735.19 54 55 8800.00 5880.89 5792.23 55 19 8900.00 5937.57 5848.91 55 41 N 13 14 ~ 5043.16 N 13 27 W 5126.35 N 13 38 W 5209.26 N 13 51 ~ 5291.63 N 14 3 ~ 5373.64 N 14 27 ~ 5455.18 N 14 48 ~ 5536.24 N 14 54 g 5616.87 N 14 40 W 5698.02 N 13 57 g 5779.51 0.47 0.24 0.88 0.41 0.58 0.54 0.50 1.16 0.44 0.88 5000.36 N 674.09 g 5045.59 N 7 41 ~ 5081.99 N 693.44 g 5129'08 N T 46 ~ 5163.31 N 713.02 W 5212.31 N 7 52 ~ 5244.09 N 732.76 g 5295.04 N 7 57 ~ 5324.48 N 752.71 ~ 5377.42 N 8 3 W 5406.35 N 772.96 ~ 5459.35 N 8 8 W 5483.70 N 793.68 ~ 5540.84 N 8 14 ~ ii ~~ 5562.60 N 814.63 W 5621.94 N 8 20 g 5642.01 N 835.63 g 5703.55 N 8 25 ~ 5721.83 N 856.00 W 5785.50 N 8 31 g 9000.00 5993.50 5904.84 56 21 9100-00 6048.49 5959.83 56 54 9200.00 6102.81 6014.15 57 20 9300.00 6156.18 6067.52 58 11 9400.00 6208.81 6120.15 58 13 9500,00 6261.22 6172.56 58 47 9600.00 6312.35 6223.69 59 29 9700.00 6363.22 6274.56 59 21 9800.00 6414.22 6325.56 59 24 9900.00' 6465.00 6376.34 59 35 N 13 31 g 5861.65 N 13 36 ~ 5944.43 N 13 35 ~ 6027.63 N 13 36 ~ 6111.44 N 13 34 ~ 6195.70 N 13 11 ~ 6Z80.14 N 12 46 g 6365.43 N 12 37 g 6450.92 N 12 14 g 6536.38 N 12 5 ~ 6622.02 O. 83 0.44 0.66 0.66 0.15 1.23 0.36 0.22 0.37 0.26 5802.38 N 875.60 ~ 5868.07 N 8 35 5883.57 N 895.17 N 5951.28 N 8 39 5965.19 N '914.88 El 6034.94 N 8 43 6047.39 N 934.75 kl 6119.20 N 8 47 6130.04 N 954.73 ~1 6203.94 N 8 51 6212-88 N 974.48 Id 6288.84 N 8 55 6296.64 N 993.73 ld 637ko57 N 8 58 6380.63 N 1012.63 14 6460.48 N 9 6464.62 N 1031.17 g 6546.35 N 9 4 6548- 85 N 1049.27 'd 6632.38 N 9 6 10000.00 6515.56 6426.90 59 43 10100.00 6566.1Z 6477.46 59 33 10200.00 6617.19 6528.53 59 1 10300.00 6668.92 6580.26 58 38 10400.00 67Z1.50 6632°84 58 4 10500.00 6774.12 6685.46 58 32 10600.00 6825.74 6737.08 59 10 10700.00 6876.95 6788.29 59 4 10800.00 6928.73 6840.07 58 38 10900.00 6980.87 6892.21 58 29 N 11 4.1 N 6707.82 N 11 37 I,I 6793.66 N 11 35 ~I 6879.21 N 11 11 ~ 6964.39 N 10 13 g 7049.16 N 9 41 ~ 7133.99 N 9 48 1~ 7219.45 N 9 46 ~1 7305.14 N 9 40 H 7390.50 N 8 50 ~ 7475.68 0.31 O.3Z 0.40 0.90 1.16 0 °97 0.02 1.26 0.82 0.82 6633.27 N 1067.07 W 671.8.55 N 9 8 M 6717.77 N 1084.47 ~ 6804.74 N 9 10 14 6801.99 N 1101.75 ~ 6890.64 N 9 12 g 6885.88 N 1118.69 ~ 6976.16 N 9 14 ~ 6969.46 N 1134.49 ~ 7061.19 N 9 15 ~ 7053.24 N 1149.03 ~ 7146.22 N 9 15 ~ 7137.66 N 1163.51 ~ 7231.87 N 9 15 ~ 7222.30 N 11'78.08 ~ 7317.76 N 9 16 ~ ! 7306.62 N 1192.55 W 7403.30 N 9 16 g *~ 7390.84 N 1206.31 W 7488.63 N 9 16 W ~,11000.00 7033.39 6944.73 58 13 11100.00 7086.29 6997.63 57 53 11200.00 7139.92 7051.26 57 12 11300°00 719~.57 7105.91 56 40 11400.00 7249.73 7161.07 56 12 11500.00 7306.22 7217.56 55 6 11600.00 7363.06 7274.40 56 6 11700°00 7417.18 7328.52 58 17 11800.00 7469.07 7380.41 58 58 t1900.00 75Z0.09 7431.63 59 51 N 8 5 W 7560.70 N 7 19 ~ 7645.51 N 6 9 g 7729.91 N 4 49 ~ 7813.65 N 3 I ~ 7897.01 N 0 49 ~ 7979.31 N 0 13 ~ 8061.20 N 0 38 ~ 8144.89 N 0 16 ~ 8230.00 N 0 17 E 8315.55 0.72 1.03 1.35 1.06 2.14 1.53 2.53 2.02 0.52 1.84 7475.01 N 1218.83 ~ 7573.72 N 9 16 ~ 7559.10 N 1230.20 g 7658.55 N 9 15 g 7642.92 N 12~0.09 ~ 7742,88 N 9 13 g 7726.28 N 1248.10 g 7826.44 N 9 11 ~ 7809.48 N 1253.91 ~ 7909.51 N 9 7 H 7891.95 N 1256.58 W 7991.36 N 9 3 g 7974.22 N 1257.08 g 8072.70 N 8 58 ~ 8058.29 N 1257.73 ~ 8155.86 N 8 52 ~ 8143.78 N 1258.44 W 8240.44 N 8 47 ~ 8229.78 N 1258.47 ~ 8325.44 N 8 42 ~ COMPUTATION DATE: 21-NAR-90 PAGE BP EXPLORATION Z-30 (11-07-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88.66 FT ENGINEER: WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF'MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DISTo AZIHUTH DEPTH DEPTH DEPTH DEG 12000.00 7569.33 7680.67 61 6 12100.00 7616.62 7527.96 62 19 12200.00 7662.41 7573.75 63 17 12300.00 7707.08 7618.42 63 35 12400.00 7751.17 7662.51 63 39 12500.00 7797.43 7708.77 61 25 12600.00 7846.43 7757.77 59 52 12700.00 7896.73 7808.07 59 53 12800.00 7946.87 7858.21 59 57 12900.00 7997.08 7908.¢2 59 45 13000.00 8047.61 7958.95 59 34 13100.00 8098.34 8009.68 59 33 13200.00 8149.13 8060.47 59 27 13300.00 8200.28 8111.62 59 5 13400.00 8251.95 8163.29 58 43 13500.00 8303.99 8215.33 58 32 13600.00 8356.46 8267.80 58 10 13700.00 8409.46 8320.80 57 44 13800.00 8463.03 8374.37 57 31 13900.00 8516.91 8428.25 57 8 14000.00 8571.55 8482.89 56 31 14100.00 8627.16 8538.50 55 39 14200.00 8684.23 8595.57 54 54 14300.00 8741.38 8652.72 55 39 14400.00 8797.27 8708.61 56 6 14500.00 8853.21 8764.55 55 49 14600.00 8909.10 8820.44 56 26 14700.00 8963.38 8874.72 57 52 14800.00 9015.48 8926.82 59 29 14900.00 9065.47 8976.81 60 11 DEG MIN FEET DEG/IO0 FEET FEET FEET DEG HIN N 0 51 E 8402.02 N I 11 E 8489.48 N I 35 E 8577.67 N I 58 E 8666.33 N 2 20 E 8755.21 N 1 53 E 8842.99 N 2 35 E 8929.28 N 2 40 E 9014.74 N ,2 28 E 9100.31 N 2 11 E 9185.91 N 2 27 E 9271.32 N 2 50 E 9356.55 N 3 4 E 9441.66 N 3 17 E 9526.51 N 3 39 E 9610.98 N 3 37 E 9695.20 N 3,46 E 9779.13 N 3 56 E 9862.71 N 4 18 E 9945.87 N 4 53 ~ 10028.72 N 5 5 E 10110.99 N 5 6 E 10192.58 N 5 27 E 10273.15 N 5 18 E 10353.59 N 5 44 E 10434.96 N 6 43 E 10515.92 N 5 6 E 10597.08 N 3 42 E 10679.70 N 2 37 E 10764.00 N 2 12 E 10849.71 1.48 0.79 1.21 0.95 2.03 1.35 1.29 0.52 0.38 0.31 8316.81 N 1257.53 W 8~11.34 N 8 36 N 8404.90 N 1255.98 ~ 8498.23 N 8 30 W 8493.78 N 1253.83 ~ 8585.82 N 8 24 W 8583.20 N 1251.07 ~ 8673.90 N 8 18'W 8672.90 N 12~7.68 ~ 8762.18 N 8 11 W 8761.48 N 1244.42 ~ 8849.42 N 8 5 ~ '~ 8848.58 N 1241.02 W 8935.19 N 7 59 W 8934.92 N 1236.94 W 9020.13 N. 7 53 W - 9021.35 N 1233.08 ~ 9105.23 N 7 ~7 W 9107.76 N 1229.62 ~ 9190.39 N 7 41 W 0.37 1.14, 0.99 0.35 0.36 0.40 0.40 0.93 0.69 1.29 9193.99 N 1226.13 W 9275.39 N 7 36 W 9280.07 N 1222.18 W 9360.21 N 7 30 W 9366.10 N 1217.74 R 9444.93 N '7 24 W 9451.89 N 1212.96 ~ 9529.40 N 7 19 ~ 9537.35 N 1207.73 ~ 9613.52 N 7 13 W 9622.57 N 1202.38 ~ 9697.40 N 7 7 ~ 9707.52 N 1196.89 ~ 9781.03 N 7 2 W 9792.13 N 1191.18 W 9864.32 N 6 56 W 9876.36 N 1185.18 ~ 9947.22 N 6 51 W 9960.34 N 1178.49 ~10029.82 N 6 45 W 5.78 10043.78 N 1171.36 M10111.86 N 6 39 0.62 10126.57 N 1164.04 M10193.25 N 6 33 0.69 10208.34 N 1156.56 ~10273.65 N 6 28 2.18 10290.02 N 1148.68 W10353.94 N 6 22 2.30 10372.60 N 1141.19 ~10435.19 N 6 17 1.22 10454.96 N 1131.79 W10516.04 N 6 11 W 1.85 10537.44 N 1123.24 W10597.14 N 6 5 1.97 10621.17 N 1116.80 W10679.72 N 6 0 2.31 10706.39 N 1112.13 ~10764.00 N 5 56 0.00 10792.92 N 1108.64 ~10849.71 N 5 52 ~14970.00 9100.28 9011.62 60 11 N 2 12 E 10909.83 0.00 10853.60 N 1106.30 ~10909.84 N 5 49 W COMPUTATION DATE: ZI-HAR-90 PAGE 5 BP EXPLORATION Z-30 (11-07-11-12) PRUDHOE 8AY NORTH SLOPE~ ALASKA DATE OF SURVEY: 08-MAR-g0 KELLY BUSHING ELEVATION: 88.66 FT INTERPOLATED VALUES FOR EVEN 1000 FEET OF NEASUREO OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 0o00 0.00 -88.66 0 0 1000.00 999.98 911.32 0 7 2000.00 1963o14 1874.48 23 16 3000°00 2754°24 2665.58 52 21 4000.00 3319.42 3230.76 55 44 5000.00 3868.09 3779o43 57 10 6000°00 4397.44 4308.78 58 59 7000.00 4906.63 4817.97 59 11 8000.00 5431.41 5342.75 57 10 9000°00 5993.50 5904.84 56 21 ENGINEER: WARNER 10000°00 6515.56 6426.90 59 43 11000°00 7033°39 6944.73 58 13 12000.00 7569.33 7480.67 61 6 13000°00 8047.61 7958.95 59 34 14000.00 8571'55 8482.89 56 31 14970.00 9100°28 9011.62 60 11 VERTICAL DOGLEG RECTANGULAR COORDTNATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST° AZIHUTH FEET DEG/IO0 FEET FEET FEET DEG NIN N 0 0 E 0°00 S 31 17 W N 7 49 W 234°09 N 9 40 W 826.43 N~ 8 28 W 1649.81 N 7 34 W 2485.32 N 5 10 W 3333.47 N 4 36 W 4193.94 N 13 14 W 5043.16 N 13 31 ~d 5861.65 0.00 0.83 1.92 2.89 0.83 0.84 0.37 0.80 0.47 O.83 o.oo .o.oo ~o.oo . o o ~ ~.o,. s ~.*r~ ~ ,..,.z's 'z~ s~ ~ 815.63 N 147.13" 828.79 N 10 1~ , 1629.57 N 280.88 ~ ~653.59 N 9 ~7 ~ ~O00.S6 ~ 6~*.0~ ~ SO~S.~ ~ ~ ~ N 11 41 W 6707.82 N 8 5 W 7560°70 N 0 51 E 8402.02 N 2 27 E 9271°32 N 5 5 E 10110.99 N 2 12 E 10909.83 0.31 6633.27 N 1067.07 W 6718.55 N 9 8 ~ 0.72 7475.01 N 1218.83 W 7573.72 N 9 16 M 1.48 8316.81 N 1257.53 W 8411.34 'N 8 36 W 0.37 9193.99 N 1226.13 ~ 9275.39 N 7 36 W 5.78 10043.78 N 1171.36 W10111.86 N 6 39 W 0.00 10853.60 N 1106.30 W10909.84 N 5 49 W COMPUTATION DATE: 21-MAR-90 PAGE 6 BP EXPLORATION Z-30 (11-07-11-12) PRUDHDE BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88.66 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH ENGINEER: WARNER TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIHU'TH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -88.66 0 0 N 0 0 E 88.66 88.66 0.00 0 7 S 34 3 E 188.66 188.66 100.00 0 8 N 5 37 W 288.66 288.66 ZO0. O0 0 14 S 21 32 E 388.66 388.66 300.00 0 14 S ~+ 18 W 488.66 488.66 ~.00.00 0 11 S 4 28 5 588.66 588.66 500.00 0 22 S 38 43 E 688.67 688.66 600.00 0 35 S 25 55 E 788.67 788.66 700.00 0 31 S 15 44 E 888.68 888.66 800.00 0 31 S 34 9 E VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET' OEG MIN 988.68 988.66 900.00 0 7 1088.70 1088.66 1000.00 2 36 1188.99 1188.66 1100.00 6 0 1289.98 1288.66 1200.00 9 46 1391.94 1388.66 1300.00 12 36 1494.96 1488.66 1400.00 15 7 1599.21 1588.66 1500.00 17 43 1704.92 1688.66 1600.00 19 55 · 1811.72 1788.66 1'?00.00 21 5 1919.28 1888.66 1800.00 22 8 0.00 0.00 0.00 N 0.00 0.16- 0.19 0.16 N 0.04 0.20 0.2:9 0.21 N 0.12 0.09 0.44 0.10 N 0.05 -0.17 0.44 0.16 S 0.17 -0.58 0.49 0.55 S 0.31 -1.17 0.35 1.12 S 0.51 -1.92 0.58 1.85 S 0.78 -2.72 0.26 Z.61 S 1.16 -3.69 0.43 3.5,5 S 1.59 S 50 49 W N 8416 N 5 16 W N 12 31 W N 14 34 14 N 12 33 W N 10 4 W N 8 51W N 9 27 W N 8 55 W 2027.82 1988.66 1900.00 23 50 2138.46 Z088.66 2000.00 26 47 2251.92 2188.66 2100.00 29 27 2368.73 2288.66 2200.00 33 23 2492.59 2388.66 2300.00 37 56 2619.05 2488.66 2400.00 38 17 2751.08 Z588.66 2500.00 43 25 2896.31 2688.66 2600.00 49 12 3057.49 2788.66 2700.00 54 1 3235.10 2888.66 2800.00 56 19 -4.18 0.59 4.02 S -2.82 3.22 2.59 S 4.46 4.42 4.72 N 18.44 2.95 18.53 N 38.09 2.91 37.79 N 62.54 2.58 61.77 N 91.84 2.32 90.63 N 126.02 1.68 124.42 N 163.¢6 0.81 203.00 1.26 3414.55 2988.66 2900.00 55 44 3591.62 3088.66 3000.00 55 24 3767.73 3188.66 3100.00 55 20 3945.14 3288.66 3200.00 56 3 4123.44 3388.66 3300.00 56 2 4303.51 3488.66 3400. O0 56 33 4485.08 3588.66 3500.00 56 53 4668.76 3688.66 3600.00 57 17 4853.64 3788.66 3700.00 57 10 5037.97 3888.66 3800. O0 57 13 N 7 45 W 245.16 N 10 45 W 292.39 bi 12 9 W 345.66 N 11 22 W 405.68 N 11 7 W 478.37 N. 10 42 W 555.49 N 10 11 W 641.36 N 9 48 W 746.31 N 9 3 7 W 872.38 N 9 21 W 1018.85 N 9 30 W 1167.58 N 9 31 W 1313.42 N 9 21 W 1458.10 N 8 34 W 1604.42 N 8 32 W 1751.88 N 8 3 W 1901.51 N 7 36 W 2052.97 N 7 21 W 2207.00 N 7 25 W 2362.44 N T 27 W 2517.22 0.00 'N 0 0 E 0.17 N 14 25 W 0.25 N 30 8 E 0.11 N 25 38 E O. 23 S 47 2 E 0.64, S 29 11 E 1.23 S 24 23 E 2.01 S 22 52 E · 2.86 S 23' 59 E 3.88 S 24 8 E 1.81 E 4.41 S 2~. 11 E 2.36 E 3.50 S 42 18 E 2.30 E 5.25 N 25 57 E 0.02 W 18.53 N 0 4 W 4.82 W 38.10 N 7 16 W 10.71 W 62.69 N 9 50 W 16.38 W 92.10 N 10 14 W 21.92 W 126.34 N 9 59 W 161.46 N 27.86 W 163.84 N 9 47 W 200.54 N 34.27 W 203.45 N 9 42 W 2.47 3.16 2.06 5.04 0.93 2.89 3.72 3.20 2.86 0 242.30 N 40.27 W 245.62 N 9 26 W 289.01 N 47.72 W 292.93 N 9 23 W 341.43 N 58.68 W 346.44 N 9 45 W 400.51 N 70.94 W 406.74 N 10 3 W 472.11 N 85.19 W 479.74 N 10 14 W 548.14 N 99.80 W 557.15 N 10 19 W 632.86 N 115.33 W 643.28 N 10 ZO W ) 736.48 N 133.58 W 748.50 N 10 17 W 861.02 N 154.84 W 874.83 N 10 12 W 1005.78 N 178'97 W 1021.58 N 10 5 W 0.14 0.38 0.57 1.07 0.37 0.21 0.51 0.97 0.29 0.87 1152.78 N 203.31 W 1170.57 N 10 0 W 1296.90 N 227.47 W 1316.70 N 9 57 W 1439.90 N 251.24 W 1461.66 N 9 54, W 1584.64 N 274.16 W 1608.18 N 9 49 W 1730.62 N 296.03 W 1755.76 N 9 42 W 1878.83 N 317.47 W 1905.47 N 9 35 W 2028.94 N 338.26 W 2056.95 N 9 28 W 2181.75 N 358.08 W 2210.94 N 9 19 W 2335.93 N 378.20 W 2366.35 N 9 12 W 2489.45 N 398.43 W 2521.13 N 9 6 W COMPUTATION DATE: 21-HAR-90 PAGE 7 BP EXPLORATZON Z-30 ¢11-07-11-12) PRUDHOE BAY NORTH SLOPEm ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88066 FT ENGINEER: WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN 5221.55 3988.66 3900000 56 48 5404.31 4088066 4000000 57 34 5594.84 4188066 4100.00 59 4 5789.60 4288066 4200000 58 38 5982.98 4388066 4300.00 58 57 6178043 4488.66 4400.00 58 56 6373.43 4588.66 4500000 59 28 6570000 4688.66 4600.00 59 34 6767030 4788.66 4700000 59 34 6964.82 4888066 4800.00 59 25 7159.17 4988.66 4900.00 59 4 7352.56 5088.66 5000.00 59 5 7542.66 5188.66 5100.00 58 0 7734.11 5288.66 5200.00 58 35 7921.13 5388.66 5300.00 57 5 8105.18 5488.66 5400.00 56 55 8286.53 5588.66 5500.00 56 9 8664.42 5688.66 5600.00 55 26 8639.07 5788.66 5700.00 54 35 8813.67 5888.66 5800.00 55 21 8991.26 5988.66 5900.00 56 18 9173.84 6088066 6000.00 57 12 9361.71 6188.66 6100000 58 16 9553.45 6288.66 6200.00 59 20 9749.86 6388.66 6300°00 59 19 9946.75 6488.66 6400.00 59 37 10144.36 6588.66 6500.00 59 20 10337.76 6688.66 6600.00' 58 21 10527.94 6788.66 6700.00 58 49 10722.73 6888.66 6800.00 58 56 410914.89 6988.66 6900.00 58 26 11106.46 7088.66 7000.00 57 52 11289.24 7188066 7100.00 56 61 11669.21 7288.66 7200.00 55 22 11646.54 7388066 7300.00 57 11 11838.12 7488.66 7400.00 59 10 12060.35 7588.66 7500.00 61 42 12258.68 7688066 7600.00 63 28 12481.50 7788.66 7700.00 61 43 12683.93 7888.66 7800.00 59 52 DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN N 7 I W 2671.13 N 6 11 W 2824.09 N 5 34 W 2986.26 N 5 29 W 3153.38 N 5 12 W 3318.90 N 4 51 W 3486.80 N 4 57 W 3654.18 N 4 37 W 3823.38 N 4 37 W 3993.41 N 4 38 14 4163.71 N 4 14 14 4330.30 N 5 41 W 4495.77 N 7 52 W 4657.42 N 11 41 W 4820.13 N 12 32 W 4977.39 N 13 28 W 5130.66 N 13 49 W 5280.56 N 14 17 W 5426.21 N 16 53 W 5567.74 N 14 35 W 5709013 N 13 31 W 5854.44 N 13 35 W 6005.82 N 13 36 W 6163044 N 12 56 W 6325.65 N 12 28 W 6493.51 N 11 56 W 6662.11 N 11 36 W 6831.68 N 10 51W 6996.46 N 9 42 W 7157.80 N 9 47 W 7326.58 N 8 43 W 7688035 N 7 16 W 7649.29 N 4 58 W 7804.66 N I 25 W 7954.12 N 0 27 W 8099.88 N 0 6 W 8262.54 N 0 58 E 8637.19 N I 68 E 8629.69 N I 55 E 8826.85 N 2 43 E 9000.99 0.55 1.52 0.34 1.12 0.33 0.97 0.44 0.38 0.55 0.43 2642.19 N 417.73 W 2675.01 N 8 59 W 279,.13 N 435.49 t.I 2827.86 N 8 52 W 2955.49 N 451.60 W 2989.80 N 8 41 , 3121.86 N 467.51 W 3156.68 N 8 31 W 3286.65" 483.07 W 3321.96 N 8 22 W 3453.96 N 497.49 W 3689.60 N 8 12 W ,,- 3958.92 N 539056 W 3995.52 N 7 46 W 4128.71 N 553o26 W 4165.61 N 7 38 W 0.30 1.92 2.09 0.80 2.01 0.21 0.69 0.49 0.73 0.53 4294.84 N 566.27 W 4332.01 N 7 31 W 6459086 N 579017 W 4497.31 N 7 24 W 6620.40 N 598.15 W 6658.96 N 7 23 W 47~0.94 N 627.56 14 4821.95 N Z 29 W 6935.78 N 659.20 W 4979.60 N 7 36 W 5086.21 N 694.45 W 5133.40 N 7 46 W 5233'23 N 730.09 ~ 5283.91 N 7 57 W 5375.98 N 765.70 W 5630.24 N 8 6 W 5514.53 N 801'84 W 5572.52 N 8 16 W 5652.89 N 838.45 W 5716.73 N 8 26 W 0.90 0.51 0024 0.89 0.69 0.54 0.82 1.27 1.13 1.10 5795031 N 873.90 W 5860.83 N 8 35 W 5963079 N 909.72 W 6013.01 N 8 42 W 6098.39 N 947009 M 6171.50 N 8 50 W 6257056 N 984082 ~ 6334.58 N 8 57 ~ 6622.68 N 1021.94 W 6503.28 N 9 2 W 6588.29 N 1057.66 14 6672.65 N 9 7 W 6755.20 N 1092.15 ~ 6862.91 N 9 11 W 6917.68 N 1124.84 W 7008.34 N 9 14 W 7076.76 N 1153.04 W 7170.08 N 9 15 W 7241.50 N 1181.38 W 7337.23 N 9 16 W 0.82 7403.37 N 1208.24 W 7501.32 N 9 16 W 1.11 7562.85 N 1230.68 W 7662.33 N 9 15 W 1.01 7717.33 N 1247.34 W 7817.48 N 9 11 W 2025 7866.67 N 1256.11 W 7966.32 N 9 4 W 2.04 8013.08 N 1257.30 W 8111.12 N 8 55 W 0.81 8176.43 N 1258.54 W 8272.77 N 8 45 W 1.46 8352.22 N 1256.97 W 8466.28 N 8 34 W 0.69 8546.24 N 1252.29 ~ 8637.50 N 8 20 W 1.75 8765.21 N 1244.96 W 8833.38 N 8 6 W 0.66 8921.03 N 1237.60 W 9006.47 N 7 54 W COHPUTATION DATE: 21-MAR-g0 PAGE 8 BP EXPLORATION Z-30 Cl1-07-11-12) PRUDHOE BAY NORTH SLOPEr ALASKA DATE OF SURVEY: 08-MAR-90 KELLY BUSHING ELEVATION: 88.66 FT ENGINEER: WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HOR[Z. DEPARTURE SECTION SEVERITY NORTH/SOUTH'EAST/WEST D,IST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN 1Z883.28 7988.66 7900.00 59 46 13080.90 8088.66 8000.00 59 31 13277.37 8188.66 8100.00 59 8 13470.60 8288.66 8ZOO.O0 58 36 13660.91 8388.66 8300.00 57 58 13847.65 8488.66 8400.00 57 30 1¢031.06 8588.66 8500.00 56 35 14207.70 8688.66 8600.00 54 54 14384.56 8788.66 8700.00 56 8 14563.23 8888.66 8800.00 56 2 14747.94 8988.66 8900.00 58 34 14946.64 9088.66 9000.00 60 11 14970°00 9100.28 9011.62 60 11 N 2 11 E 9171.61 N g 45 E 9340.27 N 3 14 E 9507.34 N 3 34 E 9670.45 N 3 53 E 9830.09 N 4 31 E 9985.39 N 5 0 E 10L36.44 N 5 30 E 10Z79.33 N 5 19 E 104Z2.41 N 5 43 E 10567.11 N 3 8 E 10719'90 N Z 12 E 10889.76 N 2 12 E 10909.83 0.34 9093.3'3 N 1230.17 W 9176.16 N 7 aZ id 1.38 9263.63 N 12Z2.99 W 9344.01 N 7 31 W 0.16 9~3Z.50 N 1214.06 W 9510.31 N 7 ZO W 0.33 9597.53 N 1Z03.95 W 9672.75 N 7 9 W 0.68 9759.11 N 1193.43 W 9831.81 N 6 58 W 0.95 9916.41 N 1182.11 W 9986.62 N 6 ~8 W .' --~ Z.SZ 10069.61 N 1169.09 W10137.25 N 6 37 id 0.67 10214.61 N 1155.97 W102:79.81 N 6 27 W Z.45 10359.85 N 11,~2.49 W10422.66 N 6 18 W 1.75 10507.01 N 1126.13 W10567.19 N 6 7 W 1.55 10661.83 N 1114'36 W10719.91 N 5 58 W 0.00- 10833.35 N 1107.08 W10889.77 N 5 50 W 0.00 10853.60 N 1106.30 W10909.84. N 5 ~9 W SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY BP EXPLORAT I ON WELL Z-90 ( 11-07- 11- 121 FIELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 08 - MAR - 90 REFERENCE 737S6 WELL ' (714' Z-30 (11-07-11 SNL, 3648' WEL, SLC 19, TllN, R12E) HORIZONTAL PROJECTION NORTH 14000 ! ~'000 ! 0000 8000 6000 4000 2000 SOUTH -2000 -8000 NEST REF 79756 SCALE = !/2000 IN/FT ~ ~ ' i ~ ~ i i ~ i ~ ~ ~ ! ~ i : : i ~ ' i i i : i ~ i : i : i i ~ i ~ i I ~ : ~ ~ ............ '"'~"'?'"?'"~'"+'"'~"'?'"?"'? .... --~..,-.~ ....... ~..*..,-~ ......... ,.~..++.4 ........... ~ ........... ,.-~ ...... ~ .................. ~ .......... , ..... ~ .......... ~ ............. ~..,..~ ............... ,..,..~ ...... ~---+---~..~-.-~4.++.4 ...... +.++.4 ....... +4...~-+...4...?..?..?i...r..?.i..i..i .... ~ ~ $ ..~.... ....... ~......~..~ ........ ~-~ ...... ~...~ ...... + ........ ~ .... ~ ....... ....~...~...~ ....... ~.......~...~ ...... ~...~...~...~ ...... ~...~...~...~ .......... . ........ ...... ~...~ ...... , -~'"~"~"?"1'"t"t-t-, ..... ?","1'-, ..... t"t"'~t ....... ?"?'?'! ...... t'"~' . ..... t . . , , : ~ t ~ , I , t ....... ~ ~ ~ ~ .... t t t t , . ? t -~..4-.~.~.-.;...{-4-~-.~ ..... ~--~--~-% ..¢-~..~-4 ..... ~-~---;-4 ..... ~.-.~--.~---~ ........ ~..+..+-~... -.~4-.~..~ ..... ~..+..~-~ ..... 4...~-.~...$ ...... ~.--+..4.~ ...... ~--~...~..+-...-~4-.e.~ ..... ~-+-.~..-~ ...... ~-.$...f.+.. ~'~'~"" -~"t-t'"t'"~ -?"?"T'"T ...... T'"T'"T'"?" ,"?"?"?"T'"1'"T"T"?"t ........ T'"?"?"T ....... t"'?":'"T'" "~", "t"'t ...... T"~"T'T--T-t"'T'~ ....... W?"T"~ ...... T"T"?"T ....... ?"?"T"'T ....... T"'T"'?-T ...... T'W"T"? '~+-+4 ...... ~-~-+-~ ...... +--+-+"~ ..... f"?'i-f"~"+'+-f-f"t'"f"f'+~ ....... ~'-~-'f'~ ...... T"'T"~'"t"'~"'t'"t-t"'t ...... f"?+"t ........ ?'T'~-r""'?'T'T"~ ...... ?~"?'"t ...... ~'"T-'f"~ ....... ?'+~"'~ ...... ~"+"~'i 'J4-~...L.~...L.L~...L.....L.L..L.~...~.44.4...~ ...... L.~-L.L.J.4...L.L.L....~..L4.4 ...... ~4..4.4...~.4...L..~...~ ...... L.~4.4 ..... L.~-~.4.4.4...L.L..~ ...... L.;J...L.~...;..L.L..~ ....... L.L.L.~ ...... L.L.L.~ ~.-~--~---~ ....... P-.~-4----~ ....... ~..-~.-.~..-~ ....... ~--4--~*-.~ ....... L...~....~--.~ ...... ~.*..~...~-..~ ....... ~*.-~...~...~ ...... ~".~"'~"'~ ........ ~-,.~...~.-.~... ~..*~...~-..~..-~ ....... ~.-~....~...~ ...... ~...~...~...~ ....... r..~....>-.~ ....... ~.-~.-.~....~ ....... ~..-,...~-.~ ...... ~ ........ : ] i ~ i ~ i i : i i i I i i ! i : i i : : · [ i : i ! ! ~ i : : i i : i i : : ! ! i : i : ! i i : : ~ i i i : ' I : i : _~+....., ...................... ?,.?]...: ..... ,..., ............ : ..... I...:...,...:.l., ....... ,..??:.~...??-?.+.+-:...~.?,.?..+.:-.?L?,.?-~ ..... ,..,..?..,-.L,-?:...: ....... ?+-~...,4+~...,..? ~.?~i: ' ......... ~ ~._?~...~: i ! ~ ....... ????:':: :_~...$._!...]._$? ...... ~'"?i t...?i...~...:_.]...~...i_]~ ....... ~:-.:-]-.~..~ ..~-~ ~-~ ..... ] ]--.~---{---i--- }-~-] ]--$ .... .... $--*-4.-~.:-~-.~-.{--i: ..... ~ ~..i-]-.-{i ..... ~ $...~..~...~ ....... ~...{...$...$...i-{..4-.~...{..l .... ~ ] / ~ ~ i ; ~ ~ ~ ~/ ~. :.~- ~ . : : ri : ~ J ~ : ] : I :. J ~ , , ~-.-,.-.t~T ...... T-+--T-.-T ....... T-.4..4...f-.~.-4..4..-~-.4 ..... T..-T---+---T...~..4--.T.-4-T ....... ~-4..4.-.~.--~+.-?.-+'-.~-q-T.q---T---T---,.--T---T-..T-~ ...... +..-T---T-.-T ....... ~-..$-..~.--~ ...... ?~"~'"T"~'"T"'~"'?'~ ....... ~'~'"T-'T"'~'-T'"~-~ ~-: ¢-¢--~ ~-~-~ 4: ~: ~: ~: ~:~ ~ ......:: ~: .... ~: ~--~---~ : ......~ ~"-¢'--~'"~:::: ....... ~'"~"'~'"~:::~: "'~-'~'"~"'~'"~"'~'"~"'t"'T:::: j : : . , .... ~ ~--,~--9---~: ~ ~ ; ........ *---~.-?.~ .~: . ~ 7 t, t. ~i ; : : : ~: ?: ; : ~! ' 7 ~ ?'?'~"'?'. . ~,..-~.--~ :--~-.+--~--T ...... T.-+--~'.~ ...... T--+--T-.~ ..... T--T-.4.--f.- ..+-+.4..~ ....... f-4..-T ...... T..4.-T..+.--.+.+-4--?-r-~--4-4-.-~ ........ ~'-+--~ ....... ~-'T"?t ..... t-t"T'% ...... t"'?"t'"t ....... t'"T'"~'"t"T"t-'~-t-~'"' ~-..T-f-?...R-+--~-~ ....... -4.-+-+-.T ....... +-+-+-4 ...... T..-f-+-+--~--+.+-+--~ ....... ~-+.+.~.--J.-+-+--+-4 ...... ~.-T-.+-4 ....... ~--+,~--4 ...... i...L-L.L-~..-~...~.4.4 ...... L.L4...&......f..t...f.-f..:.4..+..~...~ ....... $-~-.~-..~--. · ..~...~ ....... ~ ....... ~--.~---~---~ .... ...?-?.?--~' ........... ....... ?-?--.-r--? ....... r.-?-.-?-r.-~---~---~--?~ ....... ?r--'~ ...... F?-?--?'~ ...... ?'?'"?~ ....... ~.-??~'~ ....... ~-~-.-~--.~---~-~.-'~"-~"-~ ..... ~"¢'+'4 ....... ?-?-'f--f'-~ .... ~"-~--~'-"~ .... -t'?~-t .... ~"t'"t"'t'-r"t'"t'~'T'" "~-f"~"~"' "~"~'"?t"'"'TT'T"t .... ~L~ ...... ~-'~'"~--~'" ' - ........ ~ J i J i ~i ~ i J ..................................................... J J J ~ J ~ J ~ ~ J J i ~ ~.~J i J ] ............................. J J J ~ ] ~ J i~ .... J ~ J J$ ..... j..~i i J ~ ........ ' ~iJi ......... Li...i_L.._L_j L..i_..~..j..~i .... -1--~--~ ..... i--~R-..~.-.~-..~..-~--~.~ ............................. ...... ~-~...~...~ ....... +...~..-~...~ .......... ~..~.~ ....... ~...~.-~ ..... 4..+..,..~-~...~...~-..~..¢-~ ....... ~ ¢4"¢-'-~'--e+-~-I'-~--~"+'~ ........ ....... ~._~...~ ..... ~...~...~..~.. -.L~].4.-,, ~ , "-4--'~---F-~-"'' I : ~ : ~ ~ ~ ~ ..4---~.--~....~ ....... ~..4...¢...¢.-.~-..~...~..-&-..~ ....... ~..-.~.-.~...~ ....... ~...¢...¢ ..... ~ ....... &...¢...~.--~ ....... ¢...~...&...~ ....... ~...¢..4...~ ...... ~...¢...&...¢ ....... &--.~-..~--.& ........ *...~---.>.--~ .... ~.~¢--~-.i .... ?*~? ...... ?~-?.?--~.-?-? ..... +-.-~--~ ~ .... ~ "?"~'"'~'"~"' "'~-~-? ........ ~"'~"~-~"~ ........ ?"~"'-?~m'~"~"~t-'?" '~?"??" ~* ~: ~ T~"W-'TW'T"~'~"TTT'T"."T'T"T-T"'rT'T'T'T'T"T"T"T~ ...... T-~ ......... ~'t"rTT'T"T ..... t"~ T' T T"TT'~ 'T'T'T"T T ~ ~ T ~ ~ ~ ~ ..~...~_~..C.-T"~'-t .... ~"t~'-~'~" --~"t'"W"~"~ '"?"?~?'T"~ "'?"~"t'"t ....... ?"t'"~'"t -'t"'?"?-t"~ ....... t"'?"t ........ ~ t~'~"'T .... -~'"TmT ...... ~X'T"T .... m-m ...... rTT'T"::i::I::E:[: .:i.i-LL ~'~'~"!'tTT'" "'?"TT"t'"~ mT-m-~"'t'T"T'"r+"r'?"m ..... T'-~-' b.--~/~-- --~--~---t--~ .... · ...... ~"T'T"T ....... T'T'T"T ..................... ....... T"T"T'"'~ ...... Y"?'T"T ...... ~"T 'T"'T'"t'"T"T'T"T ....... T'"T"'T'"'~'"'"itt"i"~'"?'~'"i"?"~ ..... ~---k+--~j: , , ....... ~,.+.-~-..i,,, ...... ~.-+.+-.~:,,, ....... +', '+"?-'~,, j ....... ;, , , f"F"F"~ ~, , ...... T"T"T'"T .... : : ' : : i i i i : i i i i i i i i : : : : i i i i i : i i ' i i i i i i i i i i i i i : ! i i i i i : i i ~ ~ i j ! .... 4.4...1.-~ ....... i.4...~...~...~..i...~..~...~...~".~...~...~...~...~...~.`.~...~...~...j...~...~...~...~ ........ ~---~...~.--~.~ ...~-~-~-¢..~-.-~.-.~ ....... ~-.¢--~---~ ....... ~---~.-.~..4 ...... ~.--~-.+.-~ ....... ~'"~"-~"-~ ....... ~'--~'"~'"~ ...... .--+.-?-.~ ....... L..i...i...i .... ~..L4..4 ...... L.L~...L..:...~...L4-L..~..-L..L.L..~ ...... L..;-.L-.L4..-~-4.4-4:.-..-.;4.4...~J ...;~ -4.4-~--.~ ....... t-;.4---~ ...... ~-..~--4.-¢.-~.4-~-+.-~ ...... ~..~---~-.~ ...... ~--~--4-~ ...... ~.+--~.--~ ....... L4-..;4 .... -T'"['T"I ....... T"T"T"T ....... '?'T"'?"~ ...... T"'T'"'F'T" r"?' 'T"?'"T ........ ??'"?'"~ ...... ?"?"?'? ...... T""F'T"? ...... ?"T"?"? ....... P'?'"r'"~ ....... T'"T"T'"~ ...... ?"T'"T"~ ....... ~'"T"" ........... I'"I'":"'T"']'"'?'?'T'"["' .-m??.t .... +-.., ...... ~,, ...... ,,~-.t.,~+.~ .... ,-,,4...,..**., ...... ,~..&**+.+.. L,+.,J...,+++..-..+~-+-+ .... ,++.,..~..+~+...~...,._?.~ ...... ~-?.'""r'~"?"~ .... ~;~4....-;-~.-;...t.C~-;-.L-~4-.44.--;---~..¢4-.~44444 ....... ~...¢...L~.J.~...~m[N...~...;..~...'.44-;4 ..... ~...~-.~...¢ ...... L.~..¢..~ ....... ~...~-~...+ ....... ~..¢..¢..¢..~...%.¢..~ ....... ~-~...~4 .... ++--S~ .... f~.-?--4-$64--~--6.~-+.-~ ....... f.-f--f-4.--f-4--+-4-~ ...... ¢--4.+++-~---~+4.--~-++-f+..-.+.~-q-,--4---~d--4 ..... f--s.--~.--~.--.--T~-?--t ..... t'"?~ ..... ?'?"~ ....... ..~,-.,.4 ...... *-4-* ........ +..4.-4..-~..'~.--~+'-'~-.-S ....... ~--e--?S--~---S-.+..+..-S--.--¢--e--~-+-...*~--f--~.S..-.-S-~-.S-~-.-~---+---~-S ..... +..4-S-S .......... $.-4-S ...... ?S-?--t .... t...S..-t..-t ...... ???.4 ....... '~.J "?"t--ti I ~ ..... ?'t~'-~'a~ ],J ~ "'t'"~"'?'~'q~ ~ ~ ~ -'t'"?~'"t~ ~ ~ ~ ....... t'"W"~"'~ ~ J ~ ~ ....... ~P"W''~''4~ ~ j ..... ~"'~'"$'"~"~ ~ -¢-T~j'¢''4'~'L ....... ~'---~--.¢-..¢ ..... ¢..-~-¢..-¢.-*~ -.¢ .4 .... ~ ~'"' k..--K-.~--.~-.-*~ ~ ] ...... *-*-~...*~ ~ J ~. ....... ~.*---*--*~ ~ , J ...... ~-.4-.-.~ ~ ~'"~ .... ~-+ i=i ....... e-e4--+q--4.-+'+'-e'~.-+-+'+-+-' .--+.+-+.+--]-~-'+-+--+ ....... +-~.-+-+.-~--+q..+-~---.-~-+-+--~ ...... ~--+--~--.~ ...... ~.-+%--~ ...... ~--+.+-.~ ...... ~--e.~..-~ ....... ~..-~..-~---~ ..... ~.--f--~-..~.-..-.+-j---~--~ .... '4-¢'.g-~ ...... ~-+--~.-¢-.--~--.~--~.--~--.~..-~-.-~.--~..-~ ....... ~-4.-.~..-~-..~.-¢-+..~-.-~ ....... ~---~-.+-+.-~.-+.-...~.-+-..--+-.~.--4-..~ ....... ~.--~.-+.-~ ..... ~.4.-+--~ ...... ~--¢4---f.-..-¢--f"f"~ ....... f"f-'f"~ ...... f-'f'-?~ ....... ~"f'4'"f"~ ~-~-4---~-~-~-~-~--~ ...... ~-~'~-'~"'~'"?~"T"~ ....... ?"???t-T'"?"~'~ ....... ?-?'~-'~-~-'T'": "T"~~ ~'W"~'"?W"T'"T"'~ ...... ~'"?'"~-~ ...... ~"-?W"~ ....... ~'"T"T"~"T"~"'~'"?"~" ?"~"'?"~'"~ ....... ~"~"~-'~"' .~i]..L.L.L.LL..~ ..... L.;..L.LL.L¢..L.~ ...... ~.-.~.--~.-.L4-..;4.-.L.~ ....... L.L.~.4..4..4...~ i...L._4...$_~...L..'...L.L.L.~ ....... ~...~..~...~ ........ ~4..4...~ ....... ~'"~"'~'"~'"~"¢"~"'F'~ ....... ~"'~'"~'"~ ....... ~'"~'"F'~'" ~ ~ L ~.l ~. ' ~-'- -~. ~-~. · ~ ~ '-~ ~- ~ ~ ~.z 4 ~ ~ 4 4. ~-.~-~ ~ 4-4 ~ ~-~ .-~ ~ .~ ~- ~--~-~..$ ...... ~...~...~...~ ...... ~...;.4-~ ....... ~ ....... ~.4..4...~...: ....... ~ ....... ~...~...~.4 ....... ~-.$ ...... ;.. -?-m--%~'-'t~--'t ..... t'?--t-'F-~-?--?"'~ ...... ?--:.--?.-t.--~.--?-'m.-~ ....... t---:-'~'"t..-~-"~-'--~?¥'~ ~o-?--?-':-'-:"'?'-?--t ....... r---?m'-'-?"~'"t"': ....... t"?"?"~'"]'"m'"?"'; ....... ?"m'"~'"T'?"~'"?' .... ........ ...... ......... ...... ....... ....... ...... , ....... ..... .... .... ....... ~ .............. ~ ...................... , ....... , .......... ,""~'", ........... ~'"~ ........... ?"'?'"?, ....... , ....... , .............. ? ....... ~'~;~f'i'''~''i'''~q''i'''~'''~'''?'''f-~ ...... t'"~"?"? ...... t..?-.-.r...? ....... r"'?' ,~-~4-~-~--~--~---~---~---~ 4---~+-6--LH-.-~ ....... ~-.-~--~.--~---~.--i---~--.~--~ 4444-¢~-4~--. ~._~_.~.~...;.~_;.. ~_.~...~4...~ ...... ~...~4...~ ....... ~...;..~.-.~- ..4..4...~.4 ....... ~-+.6--~...~4..-~--~.-- -~-~.-I---~--~.--?~-?~-.-?--?Y.~---?--?.-~ ....... ?.-?..?--~ ....... ?.-~-'i .... ?~..??~_?..?_~.~u..;..~.;.~.4...~..;_~...;..;..~ .... .--m-.-?T-~'~ ....... ..4...~...~...~, ....... ...... ...... ~...~...~-.~ .......~.~,~,...~...~...~.......,..,...~-~... '-,-~-*~-- -.~.-~-+-~.-.~-++--?--~ ..... ,--?-, ...... ,-.-,---,-~....--~-+.?---?.-?.-,+ -~-.-, ........ ~.-.;--~ ...... ~---~--~---;-~--~-'-~"-~---~'--' ~.~- -~-~--~-~.-~---~-~-q:-~-~-.-~..-~ ...... ~--~.-~-.~--..-~-~-~-.-~-~-~--~--~--~-- .-~-¢-¢--~ ....~-.~-.~-¢4--~--~.--~.+-~---"'TT"T'~ ~'"~'"t"~ ~"'r'~"?" ..~,~,,~,~,~ ,,~ ~,~ ,~,, ~ ~,:~: ............. ""?'??-~ ....... TT'T'T",-~'"?"~'"~ ....... ?'~"T'T"?"~'"~'"~'" ' '~ "~ ~'~ ~'~ ~ '~ ~" ~'~; *~.--~.-.~.-.~..-~.--~ ....... FH-.-H.--F{-.-F~ ....... ~--.~-...~.-.~ ...... H--H ....... H.-.6-j--.H.-H-- ---,-~-~--" --~-.-~-~-~ ...... ~-~.--~---~ ...... ~-.~---~...~ .... ~..-~'--~-~ ....... ~--~"4--'~ ..... ~-~--t--~--- '~-'-~--"~ ~ ~ · ~ · : ~ , ~ : . . ~ ~ .... ~ .... ~ ~ ~ . , ...~...~...~...~ ....... ~...~...~...~ ...... ~,..'...~...~... ~-~--+~--+ ...... ~-~-.4 ..... ~--+-+-~ ...... ~.-.+-..+..-~ ...... ~.-+-+.-~ ....... ~--+-+.-+ ...... t-~"'f'~ ...... ~"~"~'"t~ -'T'"~'"?'T"I'"T"?'T'~ ....... T"T'T"?"t'"T"T"T'"'~ ....... ?"T'"T"T'" ~ ~ ~ ~ ~ ~ ~ ~ , ~ '%--~---~--~ ....... ~--~-~'¢-'~-~-"~---~---~--- '-~---~'"~-'-~ ....... ~--~---~'--~ ....... ~-'-~'-'~"~"~-f"~'"t"~ ...... f"~"i-T ........ "]~]~]]]]~]T]]]~]]~]]]~]]]~]~]]]]]]~]~ ]]]~]]~]]]~ ~"'T"'T"'T ....... ~'"T'"?"t ......T _?"'c't'"T'- .~...~..~...~, ..... ,.-,.4.4~ ...... .~.-,.~...~ ...... ,...,...~...~ ....... ~..-,...~..~...~1~--.~.-~...~..~ ....... *-*"'~"'*"'~ ~"~'"~'"~'~ ~ ~ ~./'T~ ~ ~TT ~T~ ~ ~ "'?"?"t'"t .... ....... ?"?"t'"?'t"?'?"?"T'" 4...~--~ .......... ~ ...... ~..-T.T--~-W.T-T.T ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ "'~"'*"'*'"~ ....... ...... ,.-.,...,.-., ...... ,...,...,..-, ....... ?,...?, ...... ....... ....... ?,..-,..-, ...... ,...,...,..-? ~...~.~4-~..~-.~-, ...... ~-.,...,.4-;.4...~...~ ....... ~-~...~-~.4..4-~...~..~..~..4.~...~-~.....~-~...,-, ...... ,...~...,...~...~..~...~...,.4.~'.5~ }~ ~I~ }~ ~Z Z ] Z E Z ] Z ]~...L4_;..~ ...... ;..~...L..~ .... ~ .... ~..~..~-~.., ............. ,-~--~4-.-~ ................... ~--.,.--~ ....... ~ ............. ~ ...... L.L4.~...i.4.4-4.4 ....... L4.4.4.-.~...L.L4-4 ...... L.i...i...L.'...L.L.L..L.~...~...~.4...~...~...~...~..¢..~ ....... ~--'~-'4-'f'-~'-+'-?--~"'~ : i i i i i : i i i i : : i ! i i i i i i : i !j j · -'t'-r-r~q--m-"r'T ....... m'-'r'~"T"m-m ...... f--f-.-H---Lq--+..f.-~ ....... 6'6'?"t'"tq-?"~-'t .... ~"~'-~-'~'-t-'T'~T"td'T'r"T-T ...... rT'T"~'"~'"T"'~'"r'r" ~'~ ~ ~ ~' ~ ~'~ ~...i..-L..~ ...... ~-.-~--.i.-.~... ======================================== :::::::::::::::::::::::::::::::::::::::: ....... '+'""' ....... -.~..~..?..?y?.??.~ ...... ??....?.T-?.-....~....?.T..?..?T-?..?...?~ ...... ~--.~..-~---~ ....... F..~.-+--~ ....... ~--+..e.+--~-.+-+-+--~ -6000 -4000 -2000 0 2000 4000 6000 8000 EAST WELL · (714' Z-30 (Il-07-11 SNL, 3648' WEL, S,_d' 19, TllN, R12E) ?"'VERTICAL PROJECTION 1'74. -2000 0 0 2000 4000 SO00 8000 !0000 !2000 -i-.4-.I,.4..4...~...&..~_-': ...... [.]1...~-.i...Li-L1...i ...... L4...i*.~.L.¢-,~..4...1..-L.~..-L..i...L4-4-.4.-i-L.....L4-...L..i..4...1....~...L.1... L..L.L.i.-L.I...L.L.L.L.]...L.:...i...L.I...L.L.L.~ ....... L.L..L..L.,L..L.L.";-..L. .4-,h.;..t ...... t.t...;4-... 4.4.-4.4 ...... ~-.~..."*.4 ...... ~.4...t-.,*...1..4-.4-4--4 ...... ~.--;4-4 ..... ¢.4-4-4 ....... ;.4-4'4-.-i-4-4.--t.-4-'.-.¢.4.4--.~--.'..--t--.,*..4---~ ....... ~--~.--t-4.--*'.-.;--~...~-4-.-..-4..-,~---t-4..4-4'--t-4-4''' "'T'!-T?"!~"T"i'"~;"I"t~"'~-["i"T' ~]-I-TJ~'T']-i"' 'i~'T"'"I?'i"'i ..... i~'TS~"T"?i'"i ...... T"!"T"i ...... 1'7'"i'-! ...... VT'T'T"~'"T'T"T"I ...... -.¢..4-¢...¢ ........ ¢...&4---¢ ...... ¢...~...¢..4......4-..:..4.-4...: ..-¢...¢..4...¢..-~ "4"'~-~---f" '"-f'-+-4"~ ....... ~--~"+'-+ ...... f'-'f-"f-"f--~ '-+-'~'"f"4 ...... +'-'f-"k'4 ....... ~-+"f'-'f ...... +"+"~ "+"~'--~ '4"+--+"-' '-'+'+-+-'+'-~-'+'+-+'+" -¢.4..4-4---.-4.4.4-4..- r4.4-¢.4 ..... ~4--i.4-Z--f4-4-4-d'"~'f'+'4 ...... ~--~4-+-~.-4..+.4---+-+.+-~-..--f-f-+..~ ..... f'+-~-'f-r-f-+'4"4 ...... f'4"4'"f'"{'"~-f"4"~ ...... f'+"f4'":'-f'+'+-f" -f-?--f+-r---f--¢-4'-4--- ~f-f--f-'~ ....... f--f-4"4 ....... ¢..-?'-t--'t-'i---t-i'-'~-~ .... ?"t"T"'r'r"?"t'~"i ....... t"t'"t"'¢ ....... t"i-¢'"~ ..... ¢"'?¢'"t"'rt'"?"¢'"t ....... - ~.-4--~.-4 ....... ~.-b.-~..G..- ,-~' ~ ' --¢-.-~.--~ ....... ~.--i..-~'-'-~ ...... ~'?'"~--~ ...... ?'"?~"'T" ~-~'~'~'"~ ...... T"'?"~'"? ...... t'-?"?"T ...... T'"??"? ...... ?"Y"?'"% ...... ?'"?"%'"?"T"'?"?'?"? ....... T"'?'"*"?"- "?"?"'?'"?"' -~-¢.-¢..-¢ ...... ¢4...h-, ..... , ..... ?-, ..... ?-?-? ...... ..??-~, , ....... ~ ............... ,: ]3 ~ ~"I itl ~XS] ~]]~]]i Z~': ~]~X {] ~XX]]]] X..]...;..t.~-44.~4 ...... ~--~-.4---t ...... f44.4--- -444-4.-.~ 4444..- -4¢44 ...... ~4-4-.-~ ...... f...¢.--~..i ...... t..-;44..- t ~ t ? . ~ ~ ~ ? ~ UUU? ? . . : ~ .... ~ ......... ~ : ~ ~ : ' ~ ~ : .......... '-' i '*-¢ ~ ' ~" ' t ~ ' ' * ' ' ' _~...i...~...~....'.X...L.L~ ..... i...~.4..t...t...t~...~...,~..;4,4...t-4...t ...... ;4.4.4-4-h+4..+.-.--4--~---+-.4-f--~--~--~-+++4.-F++-++...--+++4 ....... ~..++.+.. ~-4-~...¥4 ....... h4.-++-- .... ~..+.+--f ...... ~.-+-+.-~ ..... f.--*-~-~-.4---~--~',---?--?~-.-?J-.-??.?.--?- -.~--?-?--?f--?-~--'v'~ ........ :---~--~--'~-~-- "'v-r?'~ ...... v-v'-~'-'~'--~'-'~ ..... ~ i ' : : : : :~ ' : ~ : : ' ~ : ~ ~ .... .4 ~ ~ ¢ --¢-4-'4- ~ ~-~ -4.+4~---,-44..+4-..'-4-4.-4-4 ..... r-.f4-{ ........ f--f--f.~-'-*~---t-+-'f4-?r"r"r''~''~'''?''~ r-?",'"r' ~',"',"'?"?','"??"~ -4.-+-4.-4 ....... ~.-F4.--+ ...... ~..4..4--.~-....+..;.--¢---~ ....... +.-.?-+-.,~ ~- '..4 . .,.u....f..,...f..~..4...f..?.~ ....... ?.-f--,..-: ....... ?T"f"~ ...... v'?"?", ....... ~-+-+.+~-4.4~--4 .... ~..+4..+.--~4--+-4 ...... ~.4-4.~~. -f~-+-'t'-~--~-~-'~-"-~"'t'~-~ ...... f--,-r~- ~"~-'-~-~ 4-4-~-¢.~--4-4-4-4 ...... ¢-.-{~-{-.~ ....... ~4--4.-4 ....... ~.--~---+.~-¢ ~--4'~-+-+-~ ..... k.f.?~-.5-~-f-? -{..-f-f-~ ..... ~'5---f'-, ....... ~--fw--r-b--~w--!-~ ....... ~-~'~'t'-~"~-~-'~- '-.",'r'T-x'"T'-?'??'-T"'~-~-T''''TT~'? ~,~ t~ ~/]L~ ~ ~,,~, ~4''Z~ -- $-.4- ~*-., .-~-*~-~ * -*-~ * ~" * ~ *- *"'~"'t'"* .......... ??"? .... ?"~'~-'?" ~" ~'?'~--?'m '"?"~ '-~ .... ~-'?~"" "'?-?"?"~' '~?"~ ....... ~ ..... ~ ..... ? ~ ' ' ' -..~,-.~---v--~ ............................................... ...... v-.~4 ...... ~--.~.--~.--~ ...... ?-~-.-f.-~ ....... ~.--.r.-3---? ....... ?'--r--?---? ...... ?'"?'"?'V' ~'"? "'?"'? ....... T"'T"'?'"? ...... V'T'"T"? ...... ?'"~ .............. & 4--; 4-.j 4...1~. -.;44...t.4-t.t...;..: ....... :...¢...:...;...-.~...¢..-:...~....44.-N- -+~.4-: ~4-+4-:..4.~q-4- .4-4-.¢.4 ...... :-4.4..4-...+4.4-.* ..... ~.4-.+.+ ....... +-~-+.;.--...+.+++. -.~...~ .~.4~.~- .-~-~..4-~ ...... ~..4.~ ........ ~--~--~-~-~ ~.~-.t- ~.~-~-.--~-~-~:'-?~-v.4- -4-+-4--'~ ....... ~"i'-~'t ...... ~-~-~ ..... ?+"T'?'-'~-'~'~-- "~ ,L~.4..~...].4...i~i ...... LLLLL$..4...L$ ....... ;4...L~....'.4...t.~-;..j4...~.~.4...~4.44.4 ........ F44-4-4.4-4-.~ 4.444 ....... .~. ' i 4._~..: ....... ;..~...;..~ ...... $_.~.4-; ~-~.~ ~-~ ~.44 ~ .4-++.~-+4..+4..~ .... '..44.. ~ ..~-4 ...... f.4-f.4 ...... f-f-+4 ....... f--?-4-.4 ....... ?-++4.-. "'?'~"'?"t"<'"~-?'~"i'"~'"t'"~-~'"?i-'~'~ ~ ,~ ~,, ~ ............ ~{X~Bi .... i~ ............... ,---~'"'"'"" ..+.4...f.+..~....k..f~.i..i...i...f..f..?.-t-.r.v.-?...~ ....... ~""r"c'~ ....... r-r-T"-v--~-''r-?''r-v'-F''r''v''v''~ ....... r'~"'?,'~ ....... {"'r'?x-~ ...... V~q~'i ~. ~_~ .~.~ ~- .~.~.-~ 4- ~ ~_.~.~.~_....~...~..~.., -~.-~-.~-,-.~-.~-...~.4-~-~ .... .~-h~- .~.+-~.-4-t-.v,-.-~ .......... ~.~..-t ....... ~.-.,...T-x .......... ...¢-~...¢...¢ ...... ¢..¢~¢ ..... ¢--4--.¢---¢ ....... ~.-¥--~...f ....... +.--~---+---~ ....... ?---~---f-f ..... F+~4"~"4-4'4'-~"'-44'~4'-"4"'~"4'"~' ~"~4-t"'~'~]- "W"T'W"T'~ '"T"T"T"T" "'%"'T"T"Z'"' "T"?'~'" ...i...L.i..~ ...... i~.~.....L2-.~.4.-....~¢-¢...~.......4...¢...¢...;4-.;...;.4~-~..~.44.-¢4~-4 ..... f:=:h~--¢~+-.+- .4~--+-4 ...... -44-f4-~-.-t-f~4 ..... ¢444 ....... ~444-.. 4-¢44..-~.--~-4-4-+-.i.+4-44q.4-4+~ .... f++4,.4-f-f-+- +++4 ...... f..4.q.+-. ~ ~.++-4 ....... ~-+i-q ...... f'-??i"' --i'-4--++~--4q~ ..... ~--i-i--'} ...... tq"i'--} ....... f"f"?i'T't'"t"i-t"l-t"f'¢i"l"i"i¢'?i"i"!-'t .... ¢--'t'"t'"t ...... ¢-t"'t'-~ ....... ?-z--'¢ ....... r~t ...... C:'t:'Z'~""t"'?'T"T""XX"T"~"' · "?~'?-?~"'t"'?'~"~ ..... t"'~-'¢'"~ ...... ~-~"'T'I ~"'T"'~'":'"T'%"~'"~"'~ ...... ~'"T"T"~'T"T"T'~'-~ ...... T"T'%"T'~"~"~'~"'~ .... T': ~ % · --~'--~'-'f'"~"q '"+'-~'~f ..... +-~'"~'"f"' "'4'"~"'~"4 ...... f'"~'"f'"f'"~"'+'"~"4'"f ...... ~'"~"4"4--4"+"f"f ...... f"'f'4-f-'~--+-4-f--4---k-~.-4.-~.-.~ ........ +..+-.v.-~ ....... · ¢4-F4-q.-++~4- .++4-~.--.--+444---.-4-+--.f-4..+--f-4-.4-f.. ~.4-4~-~-~'4--' ~--~-4~'4-f~-S'-4-'-f--f~'"f'+"f"+ ....... t-~.-4-q ..... t"'i'"tJ ........ i'"¢"'¢"'}'"t'"t"'?'r' -i'-i'--??i"-???4 ....... ~x~-¢--i"-'~ ...... i'-i-'-??i---??-¢ ..... t--~-'tm ...... t-%--~--i---"x-"t'"t"'t-J'"t'-t-t"'¢ ..... ¢'"T"'¢"'¢'"~'"¢'"?'"?"'¢ ...... ¢'"T"?'T'TT"T"']'"T ....... T'"~'T'T'T'T"'T'T'T"' - '-?'"~4'd"4"'4"'~'"?::~:::;:z ::::::::::::::::::::::::::: ,, 4 "?" '"~ i'-t'" t'"t' "~'"? .... :::::::::::::::::::::::::::::::: ....... ]""~"'?~'"t"'~'"'~'"~"4~'' ':'~ ......... ::: '"~'": ::: ::: :::: i" i" i"' "-~'"~"~'-:. .,..,: ,? ...... "-~+~?~ ~-: & 4-~--~-.~-.,-~.-.~-.~-'~'" ? ?i ....... :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ??t-i ~ ~ 44.44.4 444.4 ...... t44.4.4-t44...t ....... ~--4---L¢ ....... L~.4.+-.4-++4.44-+4.+..+++4-.~-4.+.~-~ ....... ~.--H-4 ...... 6--~.+.~.+-?-!---?.-kf-.f.f..i ....... f'-?-'~'"G'+-i-q"i ~ $ ~ ~ ~ ~ ¢ ~ ~ ¢ ~ ;-~.*.¢.*~.*.~ ....... ~.---i--*.i-.-i ....... ~....i....~.-..~ ...... ~-..~..4---~...i.*-~ ........ ~..4 ....... ~...~...~....:..q...~...~...+....i ....... ~...~....~...~ ........ ?..~...~.--~ ....... k'-t'-'$'"¢"*?"'t'"?'"?~ ....... ~ J } i ~ i ~ i f ~ ~ ~ } I ] } ~ ~ ~ ~ ~ ~ ~ j ~ ~ ~ ~ ~ ~ , ~ ] ; * ~ ~ i ~ ~ : ~ : ' : , L * i. L..'...:....L..L..L..b..¢...¢...L..~ ...... L..¢..¢...~ '...¢...¢...~...~.. "'T"T"T'T'i'"* i ~ ~ ~* ** ** *~ ~ ~ ~* ~_ ~ L.i* ._]..~i ....... ~i-L ~.4..~-.I ...... i..4-.i...I ....... i...i...i.-.i ....... i-4..&.~ ...... 1...I...L~ ....... i...~...I...L.~...~..-~..4...* ...... ...... ...... -~ -*~-~ t-~-~--~-~ -~ ................... ~-~-t--~-,--~--*--~-~-*-*.-~ ....... ~---~-~-~---~..*-~ ~-~-t~,, ............ ~ ........................... 4~ ~ ~ ~'"~ ........... ....... ~.-4-..~.--~..-~-4--4--4.-4.-- ...~.4...;4 ....... ~...~-.~...~ ..... ...... ;..;..~_~..~...~...~4..;..~ 4.444-q.¢4.+-~ ..... ~..-~---~.-.~ ........ ~..4...~-..~ ....... ..... 4.444 ...... ~.-~4.4-.,-~.q4..~44444 ....... ~4...~-~~.~' -44~-~k~.-H--++~.4.++-4 ..... ~.+++.,..+++-~ ....... ~.+++-~.+++4 ....... .... ...... ....... ....... ....... ...... .... ~.-44--4 ...... ~-4--4..4.-.~-4-.4--f-4 ....... f-'f--{-~ ...... {-f--f'~ ...... f"f"f"f"~"?f"f"f"r't"f"~"'f'""?f"f"f"~"'f"?'f"~ ....... ~'"?'?'~"T'T'"F'"F'7"~'"T'T"T"?"T"V'T'T"~ ...... T"7"T"V'~ .... f4"4---{ ....... f"f"f"f"~'+'?'t'~ ....... f-f'"k"~ ...... f"?f-~ ...... f"}'~f'~ ...... f'?f"f"r~'"~"?~ ....... ?-?--?.~ ...... ~-"~"-~'--~"-,-'-'r"',"',"','","','", .... ??'?'i ...... ?-?i ...... ~'~n~'-~'"~"'~ ....... t?'"?i ....... ~'"i'-~"'~"'~?'¢'?"?r"'~"~"~"'~ ....... ???'"~'"?TT"}'""'T'T'T'T'"rT'T'T'T":"T'T'T'"[ ...... ...4.4-~4 ..... ,..~_.~_.~ ...... ;..~.4.4 ...... ~..44...~.-..4..~4 ...... ,4.+.~ .... ~+.¢.¢ ~.~.4 ..... ~-~.+4~-+4..++.~+4.++47~...~...?..~-..~-..?.-~-.-~ ...... ?~.-.?--~ ....... ?..~---?..?-..~...~-~..? : ~ ! ~ ~ i i ~ i ~ i [ i ~ : : : . : : i : : t , : : : : ...:...~.-}-..}---.~--4--}---},~..-}--.}--,}-.-} ....... 4...4...4..-4...4...;-.*...4...4..-~..-4...4,..4...4 ...... '.--'..4...4 ...... 4...4...4..4...J...4...~...4...4 ~..~._,...~ ...... ~.~.~..~ .... ~.~...,...~ ....... ,,.,...~...~ ....... ~...~..,.., ...... ~...?...~...~ ..... ?...?.?..~.... ~ ................ : .... : : : ~ ~ : : : : : : ~ : : : : 44.4...~ ....... 4...4...4.4 ..... 4...4.4.4..+.4-4.4...4 ....... 4.4.4..4 ....... ~...4-4.4...~..+.4---3-f..bf.4..+.4 ....... f-4-.4---f..~...4..+.-f.4-,-4.-.f.-f-f4'-'f-4"-f"f--~-'-f?'?", ....... ~.-.~...~...~ ....... ???"~'"~"'t"?'"~'"~ 4 ~-~ ~ ~-4.. ~. -~-~-~- ~- L~...~..* ...... 3-.4.-~...~.-..~.~...~-4...~--'~-4-+-' -~4~" ---+...3-+-+.4 -4--~--ff"-~-- ~-+'"+-+"+'"3"+'+"+"+-4 .-+-+-+"3 ....... 3.-q'.+'-~ ....... ?'?"ff"'ff'"~'"T"'~"'v"T- ' j · --.~-.4---~-.-+--., ---~--+*~'-4 ..... ~.-4-S-f-- --~'--v'+--. ....... ??-"?-? ....... ?-'-~-'-?"'v", -?'"T"?'"?"' ;"~'"?-?'"? ....... ?-"?-v-T'-, '-?-"v--~-~ ...... ?'"?'?"'~'"~"' ,'"?'"?"~ ....... -++4---f---4'4-4-~- 4-~-~--q-~-f-+-"-4'-'S-*'~'"~'"~-+~S -~$'?f" ~"?~"~ ....... f"f4'"~'~"'~4"'f"~ ..... ~'"~"?~'"~"'T"~'"~'"~ .... T"T"?'~ ....... ~ ~ : ' ~ ~ ~ ~ ~ ~ ' ' ~ ' ~.- - ~/:' ~ ~ ' ~ ~ *¢ '¢ ~*¢'''~'~'''¢_ _ ~ ..... ~"¢'~"'¢ ......._.__T __.¢-'~"¢'"~ ...... ~...¢-.¢...~......~..,-.~...,.. ~ ...... ,..-,...,..., ...... ~...,...,...~ ....... ,....,...e...~ ........ ~...~-..,.-.~ ...... ~...,.--,-., '"?'?"?'?"]'"~'~'?~'-?'~-?--?""~?"'?-'?" ? ? ~ ? . : : t : : : : : : : : : : : : i ~ : : : : : : ---f--~"-f--~ ....... f'-~-'-f-'~ ...... ~t~i"i"~ ....... t'--~'--t"-~'-'t'--~'-'?-?~"-??'t"v'?¢"t'"t ....... r'r'r-rr~'"~-'"r'~ ....... ~"'?'t'"~'"?"'t'"?~ ?'t"'?""~ ?'~"'~ ~'"~"T"r' .... '"V'T"'T"? 14000 354. PROJECTION ON VERTICAL PLANE 9S4. - 1'24. SCALED IN VERTICAL OEPTHS HORIZ SCALE = 1/2000 IN/FT [ TELECO1 Teleco Oilfield Se~ ~,s of Alaska Inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 February 28, 1990 JOB #717 BP EXPLORATION (ALASKA) INC. WELL: Z-30 EILEEN WEST END RIG: AUD #2 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures A .~iA'I' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 02/27/90 Company: Well: Location: Rig: BP EXPLORATION Z-30 EILEEN WEST END AUD # 2 TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 743TAK 0.0° 30.0° 30.0° 354.4° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE INTO SINGLE SHOT GYRO 485 0 0.0 0.0 485.01 0.01 0.01N 0.01E 0.01 N 45.00E 0.00 TELECO MWD SURVEYS 960 475 0.7 155.5 960.00 -2.69 2.59S 1.21E 2.86 S 25.11E 0.15 1052 92 1.5 15.2 1051.99 -2.10 1.94S 1.76E 2.62 S 42.28E 2.27 1144 92 4.0 3.6 1143.88 2.20 2.44N 2.28E 3.34 N 43.12E 2.78 1235 91 7.6 356.3 1234.40 11.36 11.62N 2.09E 11.81 N 10.20E 4.02 PAGE 1 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD 02 Meas Course True Vertical COordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 1328 93 11.0 348.2 1326.16 26.34 26.45N 0.12W 26.45 N 0.27W 3.92 1421 93 13.1 346.1 1417.11 45.60 45.38N 4.47W 45.60 N 5.63W 2.30 1515 94 15.7 351.0 1508.15 68.84 68.29N 9.02W 68.88 N 7.52W 3.05 1608 93 17.6 349.6 1597.25 95.41 94.55N 13.52W 95.51 N 8.14W 2.09 1702 94 19.9 352.7 1686.25 125.57 124.40N 18.12W 125.71 N 8.29W 2.67 1796 94 20.8 351.3 1774.39 158.22 156.76N 22.68W 158.40 N 8.23W 1.09 1891 95 21.8 352.0 1862.90 192.69 190.91N 27.68W 192.90 N 8.25W 1.09 1983 92 22.8 353.1 1948.02 227.58 225.52N 32.20W 227.81 N 8.13W 1.18 2076 93 25.0 353.4 2033.03 265.26 262.95N 36.62W 265.48 N 7.93W 2.38 2169 93 ~27.4 349.6 2116.47 306.24 303.53N 42.75W 306.53 N 8.02W 3.14 2272 103 29.4 350.6 2207.07 355.09 351.79N 51.16W 355.49 N 8.27W 2.00 2367 95 33.0 349.9 2288.32 404.17 400.29N 59.51W 404.68 N 8.46W 3.82 2461 94 37.4 351.3 2365.10 458.22 453.74N 68.32W 458.85 N 8.56W 4.75 2553 92 37.1 350.3 2438.34 513.80 508.71N 77.22W 514.54 N 8.63W 0.73 PAGE 2 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 2646 93 38.7 349.9 2511.72 570.76 564.98N 87.04W 571.65 N 8.76W 1.74 2741 95 42.~ 349.9 2583.84 632.38 625.84N 97.88W 633.45 N 8.89W 4.00 2834 93 46.7 350.3 2650.04 697.48 690.15N 109.10W 698.72 N 8.98W 4.53 2929 95 50.2 350.6 2713.04 768.39 760.25N 120.89W 769.80 N 9.04W 3.69 3023 94 53.0 350.6 2771.42 841.89 832.93N 132.92W 843.47 N 9.07W 2.99 3164 141 54.3 351.0 2854.98 955.23 945.04N 151.06W 957.04 N 9.08W 0.94 3308 144 56.2 351.7 2937.06 1073.37 1062.01N 168.84W 1075.34 N 9.03W 1.38 3403 95 55.8 351.0 2990.18 1152.01 1139.87N 180.68W 1154.10 N 9.01W 0.73 3497 94 55.5 351.0 3043.22 1229.48 1216.52N 192.80W 1231.71 N 9.01W 0.32 3590 93 55.5 351.7 3095.90 1306.01 1292.29N 204.32W 1308.35 N 8.98W 0.61 3683 93 55.4 351.7 3148.64 1382.52 1368.09N 215.38W 1384.94 N 8.95W 0.11 3776 93 55.4 351.3 3201.45 1458.97 1443.80N 226.70W 1461.49 N 8.92W 0.35 3871 95 55.5 352.4 3255.33 1537.13 1521.25N 237.79W 1539.73 N 8.88W 0.96 PAGE 3 ComDany: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 3964 93 55.9 352.7 3307.73 1613.92 1597.43N 247.75W 1616.53 N 8.82W 0.51 4059 95 56.1 352.0 3360.86 1692.63 1675.49N 258.23W 1695.27 N 8.76W 0.64 4153 94 55.9 352.0 3413.42 1770.48 1752.66N 269.06W 1773.19 N 8.73W 0.21 4247 94 56.4 352.7 3465.78 1848.50 1830.03N 279.44W 1851.25 N 8.68W 0.81 4342 95 56.3 352.7 3518.42 1927.54 1908.47N 289.49W 1930.31 N 8.63W 0.11 4436 94 56.4 352.7 3570.51 2005.76 1986.09N 299.44W 2008.53 N 8.57W 0.11 4530 94 57.1 352.0 3622.05 2084.32 2064.00N 309.90W 2087.14 N 8.54W 0.97 4624 94 57.1 353.1 3673.11 2163.20 2142.26N 320.12W 2166.04 N 8.50W 0.97 4719 95 57.0 352.7 3724.77 2242.89 2221.37N 329.98W 2245.74 N 8.45W 0.37 4813 94 57.0 353.1 3775.96 2321.70 2299.61N 339.72W 2324.57 N 8.40W 0.36 4907 94 57.1 353.4 3827.08 2400.57 2377.95N 348.99W 2403.42 N 8.35W 0.28 5000 93 57.0 353 . 4 3877.65 2478 . 60 2455.47N 357 . 96W 2481.43 N 8.29W 0.10 5094 94 57.1 354.5 3928.77 2557.48 2533.92N 366.28W 2560.25 N 8.23W 0.99 PAGE 4 Compan¥:~'BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 5189 95 57.0 354.1 3980.44 2637.21 2613.24N 374.19W 2639.90 N 8.15W 0.37 5283 94 56.7 354.5 4031.83 2715.91 2691.56N 382.01W 2718.53 N 8.08W 0.49 5377 94 57.2 354.5 4083.10 2794.70 2769.99N 389.56W 2797.25 N 8.01W 0.53 5472 95 58.4 354.5 4133 . 72 2875.09 2850.00N 397.27W 2877.56 N 7.94W 1.26 5566 94 59.1 354.8 4182.49 2955.45 2930.02N 404.76W 2957.84 N 7.87W 0.79 5659 93 59.2 354.8 4230.17 3035.29 3009.53N 412.00W 3037.60 N 7.80W 0.10 5752 93 59.1 355.2 427~7.86 3115.12 3089.07N 418.96W 3117.35 N 7.72W 0.38 5845 93 58.9 353.8 4325.77 3194.84 3168.41N 426.59W 3197.00 N 7.67W 1.31 5940 95 58.8 354.5 4374.91 3276.14 3249.29N 434.88W 3278.26 N 7.62W 0.64 6033 93 59.3 355.9 4422.74 3355.89 3328.77N 441.55W 3357.92 N 7.56W 1.40 6128 95 59.6 355.5 4471.03 3437.68 3410.35N 447.69W 3439.61 N 7.48W 0.48 6222 94 59.2 355.5 4518.88 3518.58 3491.01N 454.04W 3520.41 N 7.41W 0.43 6316 94 59.4 355.9 4566.87 3599.38 3571.61N 460.10W 3601.12 N 7.34W 0.42 PAGE 5 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6411 95 59.2 356.3 4615.37 3681.03 3653.10N 465.65W 3682.66 N 7.26W 0.42 6505 94 59.6 355.9 4663.22 3761.91 3733.83N 471.16W 3763.44 N 7.19W 0.56 6600 95 59.8 355.9 4711.15 3843.90 3815.64N 477.02W 3845.34 N 7.13W 0.21 6693 93 59.6 356.3 4758.07 3924.17 3895.75N 482.48W 3925.51 N 7.06W 0.43 6788 95 59.7 356.3 4806.07 4006.10 3977.56N 487.77W 4007.35 N 6.99W 0.11 6882 94 59.7 355.9 4853.50 4087.23 4058.53N 493.29W 4088.40 N 6.93W 0.37 6976 94 59.5 356.3 4901.06 4168.27 4139.42N 498.81W 4169.36 N 6.87W 0.42 7071 95 59.1 356.3 4949.57 4249.91 4220.93N 504.08W 4250.93 N 6.81W 0.42 7165 94 59.0 356.6 4997.90 4330.48 4301.40N 509.07W 4331.42 N 6.75W 0.29 7257 92 58.7 356.6 5045.48 4409.17 4380.00N 513.74W 4410.03 N 6.69W 0.34 7351 94 59.2 354.5 5093.97 4489.68 4460.28N 519.99W 4490.49 N 6.65W 1.99 7445 94 57.9 353.4 5143.02 4569.86 4540.02N 528.44W 4570.67 N 6.64W 1.71 7539 94 58.0 353.1 5192.89 4649.52 4619.15N 537.80W 4650.35 N 6.64W 0.29 PAGE 6 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 7631 92 58.8 349.6 5241.10 4727.75 4696.60N 549.60W 4728.65 N 6.67W 3.35 7725 94 58.4 348.9 5290.08 4807.66 4775.42N 564.56W 4808-68 N 6.74W 0.76 7818 93 57.6 349.2 5339.36 4886.17 4852.85N 579.54W 4887.34 N 6.81W 0.90 7912 94 57.5 347.5 5389.80 4965.04 4930.54N 595.56W 4966.38 N 6.89W 1.53 8007 95 57.3 347.1 5440.98 5044.46 5008.61N 613.15W 5046.01 N 6.98W 0.41 8099 92 57.0 346.8 5490.88 5121.09 5083.91N 630.61W 5122.87 N 7.07W 0.42 8192 93 56.5 346.8 5541.87 5198.18 5159.63N 648.37W 5200.21 N 7.16W 0.55 8286 94 56.2 346.4 5593.95 5275.70 5235.75N 666.50W 5278.00 N 7.25W 0.48 8381 95 55.8 346.8 5647.08 5353.72 5312.37N 684.75W 5356.31 N 7.34W 0.55 8475 94 55.5 346.8 5700.12 5430.64 5387.92N 702.47W 5433.53 N 7.43W 0.32 8569 94 55.0 346.4 5753.69 5507.15 5463.06N 720.37W 5510.35 N 7.51W 0.63 8658 89 54.8 346.1 5804.86 5579.23 5533.79N 737.68W 5582.74 N 7.59W 0.36 8752 94 55.1 345.7 5858.84 5655.33 5608.43N 756.43W 5659.21 N 7.68W 0.47 PAGE 7 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 8844 92 55.5 346.4 5911.21 5730.16 5681.83N 774.66W 5734.40 N 7.76W 0.76 8937 93 55.7 346.8 5963.76 5806.17 5756.48N 792.44W 5810.77 N 7.84W 0.41 9031 94 56.5 347.8 6016.19 5883.59 5832.59N 809.59W 5888.51 N 7.90W 1.23 9125 94 56.9 347.5 6067.79 5961.60 5909.34N 826.40W 5966.84 N 7.96W 0.50 9224 99 57.7 347.1 6121.28 6044.26 5990.61N 844.71W 6049.87 N 8.03W 0.88 9317 93 58.6 347.5 6170.35 6122.65 6067.67N 862.08W 6128.61 N 8.09W 1.03 9410 93 58.5 347.8 6218.88 6201.43 6145.17N 879.05W 6207.73 N 8.14W 0.30 9503 93 59.2 348.5 6266.98 6280.54 6223.07N 895.39W 6287.15 N 8.19W 0.99 9596 93 59.5 348.2 6314.39 6360.10 6301.43N 911.55W 6367.01 N 8.23W 0.42 9690 94 59.5 348.2 6362.10 6440.61 6380.71N 928.11W 6447.85 N 8.28W 0.00 9783 93 59.5 348.5 6409.30 6520.29 6459.19N 944.29W 6527.85 N 8.32W 0.28 9881 98 59.7 349.6 6458.90 6604.44 6542.17N 960.35W 6612.29 N 8.35W 0.99 9974 93 59.9 350.3 6505.68 6684.57 6621.32N 974.37W 6692.63 N 8.37W 0.69 PAGE 8 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 10067 93 59.6 349.2 6552.53 6764.64 6700.37N 988.67W 6772.92 N 8.39W 1.07 10160 93 59.2 348.9 6599.87 6844.33 6778.96N 1003.87W 6852.89 N 8.42W 0.51 10253 93 58.9 349.6 6647.70 6923.76 6857.32N 1018.75W 6932.58 N 8.45W 0.72 10347 94 58.3 349.9 6696.67 7003.73 6936.27N 1033.03W 7012.77 N 8.47W 0.69 10441 94 58.3 351.0 6746.07 7083.51 7015.14N 1046.29W 7092.74 N 8.48W 1.00 10534 93 59.3 351.3 6794.25 7162.92 7093.74N 1058.52W 7172.28 N 8.49W 1.11 10627 93 59.2 351.0 6841.80 7242.72 7172.71N 1070.81W 7252.20 N 8.49W 0.29 10720 93 59.0 351.7 6889.55 7322.41 7251.61N 1082.80W 7332.01 N 8.49W 0.67 10815 95 58.7 351.3 6938.68 7403.60 7332.02N 1094.82W 7413.31 N 8.49W 0.49 10908 93 58.4 352.4 6987.21 7482.86 7410.56N 1106.07W 7492.65 N 8.49W 1.06 11001 93 58.2 352.1 7036.08 7561.93 7488.96N 1116.74W 7571.77 N 8.48W 0.35 11095 94 57.8 353.1 7085.89 7641.60 7568.01N 1127.01W 7651.47 N 8.47W 1.00 11187 92 57.1 355.2 7135.39 7719.14 7645.15N 1134.92W 7728.93 N 8.44W 2.07 PAGE 9 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 11282 95 56.5 356.3 7187.41 7798.61 7724.42N 1140.81W 7808.21 N 8.40W 1.16 11375 93 56.0 358.0 7239.08 7875.85 7801.65N 1144.65W 7885.18 N 8.35W 1.62 11468 93 54.9 359.8 7291.81 7952.22 7878.23N 1146.12W 7961.17 N 8.28W 1.98 11555 87 55.4 1.9 7341.53 8023.16 7949.62N 1145.06W 8031.66 N 8.20W 2.06 11649 94 58.2 0.8 7393.00 8101.23 8028.24N 1143.22W 8109.23 N 8.10W 3.14 11750 101 58.9 0.8 7445.69 8186.86 8114.39N 1142.02W 8194.36 N 8.01W 0.69 11844 94 59.2 1.5 7494.04 8266.93 8194.99N 1140.40W 8273.96 N 7.92W 0.71 11939 95 60.6 1.2 7541.68 8348.52 8277.16N 1138.46W 8355.08 N 7.83W 1.50 12031 92 62.1 2.6 7585.79 8428.57 8357.84N 1135.78W 8434.67 N 7.74W 2.11 12125 94 62.8 3.3 7629.27 8510.99 8441.07N 1131.49W 8516.57 N 7.63W 1.00 12219 94 63.5 2.6 7671.72 8593.93 8524.83N 1127.17W 8599.02 N 7.53W 1.00 12305 86 64.2 4.7 7709.63 8670.13 8601.86N 1122.26W 8674.76 N 7.43W 2.34 12398 93 63.1 4.3 7750.91 8752.18 8684.94N 1115.72W 8756.31 N 7.32W 1.24 PAGE 10 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 12524 126 61.0 3.6 7809.95 8861.95 8795.98N 1108.04W 8865.49 N 7.18W 1.73 12593 69 59.8 4.7 7844.03 8921.09 8855.82N 1103.70W 8924.33 N 7.10W 2.24 12687 94 60.1 4.3 7891.10 9001.20 8936.93N 1097.32W 9004.04 N 7.00W 0.49 12779 92 60.1 3.6 7936.96 9079.86 9016.49N 1091.83W 9082.36 N 6.90W 0.66 12867 88 59.9 3.3 7980.96 9155.13 9092.57N 1087.24W 9157.34 N 6.82W 0.37 12967 100 59.6 3.6 8031.34 9240.45 9178.79N 1082.04W 9242.35 N 6.72W 0.40 13061 94 59.6 3.6 8078.91 9320.49 9259.71N 1076.95W 9322.13 N 6.63W 0.00 13154 93 59.7 4.7 8125.90 9399.60 9339.75N 1071.14W 9400.98 N 6.54W 1.03 13249 95 59.2 4.7 8174.19 9480.09 9421.29N 1064.44W 9481.23 N 6.45W 0.53 13341 92 59.1 5.0 8221.36 9557.78 9499.99N 1057.76W 9558.70 N 6.35W 0.31 13432 91 58.8 4.7 8268.30 9634.45 9577.67N 1051.16W 9635.18 N 6.26W 0.44 13522 90 58.5 5.0 8315.12 9710.05 9654.25N 1044.65W 9710.61 N 6.18W 0.44 13613 91 58.2 6.1 8362.88 9786.06 9731.35N 1037.16W 9786.47 N 6.08W 1.07 PAGE 11 Company: BP EXPLORATION, Well: Z-30, Location: EILEEN WEST END, Riq: AUD ~2 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 13704 91 57.8 5.0 8411.10 9861.78 9808.16N 1029.68W 9862.06 N 5.99W 1.11 13796 92 57.6 5.7 8460.26 9938.14 9885.59N 1022.43W 9938.32 N 5.90W 0.67 13887 91 57.2 5.4 8509.29 10013.36 9961.89N 1015.01W 10013.47 N 5.82W 0.52 13978 91 56.3 6.1 8559.18 10087.99 10037.61N 1007.39W 10088.03 N 5.73W 1.18 14070 92 55.8 5.7 8610.56 10162.78 10113.52N 999.54W 10162.79 N 5.64W 0.65 14161 91 54.9 6.4 8662.30 10236.11 10187.96N 991.66W 10236.11 N 5.56W 1.17 PAGE 12 TELL~O 0 ~ 1 f ~ e 1 d Se p v ~ c e s PLAN VIEW 12800 BP EXPLORATION Z-30 EZLEEN WEST END AUD #2 JOB# 743TAK/O0 SCALE: 1 inch = 1600 feet + 13978 13522 1306! ~2687 12305 11939 11468 11001 10584 t0067 9596 ' 9125 ' 8658 ' 8~92 ' 7725 7257 ' 6882 ' 6505 ' 6128 ' 5659 ' 5189 4719 B77~ 3308 283~ 1~200 9600 8000 6400 z 0 I 4800 3200 1600 ~600 8000 6400 4800WEST 32~?t) 1600 0 1600 -lO00 0 2000 4000 T8000 08000 iO000 12000 14000 ~6000 18000 TELL~O 0 i 1 f i e 1 d Se r v i c e s VER T I C AL PROJECT I ON 1000 3000 5000 7000 gO00 ilO00 8485 ' .0~ deg 960 ' .7 Oeg 1421 ' 13.i Oeg 89i ' 21.8 deg 367 ' 33.01 deg 9 ' 50.2 Oeg 3 ' 55.4 deg BP EXPLORATION Z-30 EILEEN WEST END AUD #2 JOB# 743TAK/O0 SCALE: 1 inch = 2000 feet VERTICAL SECTION (ft) ~ deg 59.~ deg 54.9 deg GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMPANY Z-30 WELL NAME WEST EILEEN, ALASKA LOCATION AL 290 D9 MWD 3/7/90 mmmmmmmmmmmmmmmmmmmmm JOB NUMBER TYPE SURVEY DATE DIRECTIONAL LYNN HENSLEY SUPERVISOR ~ '! ~' . .~ .... NAME TITLE SIGNATURE 0 FT 14237 FT mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm DEPTH INTERVAL FROM TO 1/31/90 3/1/90 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF'.THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. · . !i ICROFILHED GREAT LAND DIRECTIONAL DRILLING,INC Client .............. : BP EXPLOP~ATION Well : WEST EILEEN #Z 30 · .e...........®. ~ Vertical Section at.: N 5.56 W Magnetic Declination: 30 deg 0 min E Data file name ...... : B:WZ30D.DAT RECORD OF SURVEY (Well assumed vertical to MD of 3/8/90 Computation: RADIUS OF CURVATURE Survey date: 2/4/90 Method ..... : MWD RKB Height.: 88.7 ft 0.0) MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 0 0 0 0.00 -88.66 485 0 0 485.00 396.34 960 0 42 959.99 871.33 1052 1 30 1051.97 963.31 1144 4 0 1143.86 1055.20 0.00 N 0.00 E 0.00 N 0.00 E -2.74 S 24.50 E -2.77 N 15.20 E 1.49 N 3.60 E 0.00 N 0.00 E 0.00 N 0.00 E 2.64 S 1.20 E 2.53 S 2.56 E 1.82 N 3.28 E CLOSURE DISTANCE DG MN S 0.00 N 0 0 0 E 0.00 N 0 0 0 E 2.90 S 24 30 0 E 3.60 S 45 17 6 E 3.75 N 60 59 6 E DOG LE 0.00 0.00 0.14 0.87 2.71 1235 7 36 1234.38 1145.72 1328 11 0 1326.14 1237.48 1421 13 6 1417.09 1328.43 1515 15 42 1508.13 1419.47 1608 17 36 1597.22 1508.56 10.64 N 3.70 W 25.64 N 11.80 W 44.90 N 13.90 W 68.14 N 9.00 W 94.72 N 10.40 W 11.01 N 3.27 E 25.88 N 1.24 E 44.81 N 3.07 W 67.71 N 7.71 W 93.98 N 12.20 W 11.48 N 16 32 7 E 25.91 N 2 44 54 E 44.91 N 3 55 32 W 68.15 N 6 29 57 W 94.76 N 7 23 55 W 3.95 3.67 2.26 2.79 2.04 1702 19 54 1686.23 1597.57 1796 20 48 1774.36 1685.70 1891 21 48 1862.87 1774.21 1983 22 48 1947.99 1859.33 2076 25 0 2033.01 1944.35 124.88 N 7.30 W 157.53 N 8.70 W 192.00 N 8.00 W 226.89 N 6.90 W 264.56 N 6.40 W 123.83 N 16.85 W 156.20 N 21.40 W 190.34 N 26.41W 224.95 N 30.94 W 262.37 N 35.30 W 124.97 N 7 44 58 W 157.65 N 7 48 5 W 192.16 N 7 53 60 W 227.07 N 7 49 51 W 264.74 N 7 39 46 W 2.47 0.97 1.05 1 ~,0 L ~ 2169 27 24 2116.45 2027.79 2272 29 24 2207.05 2118.39 2367 33 0 2288.29 2199.63 2461 37 24 2365.08 2276.42 2553 37 6 2438.32 2349.66 305.56 N 10.40 W 354.40 N 9.40 W 403.48 N 10.10 W 457.53 N 8.70 W 513.10 N 9.70 W 302.98 N 41.30 W 351.24 N 49.72 W 399.73 N 58.05 W 453.18 N 66.90 W 508.15 N 75.80 W 305.78 N 7 45 42 W 354.74 N 8 3 25 W 403.93 N 8 15 47 W 458.09 N 8 23 51 W 513.77 N 8 29 4 W 2.73 1.95 3.79 4.71 0.51 2646 38 42 2511.70 2423.04 2741 42 30' 2583.82 2495.16 2834 46 42 2650.02 2561.36 2929 50 12 2713.02 2624.36 3023 53 0 2771.40 2682.74 570.06 N 10.10 W 631.68 N 10.10 W 696.78 N 9.70 W 767.69 N 9.30 W 841.19 N 9.40 W 564.42 N 85.62 W 625.28 N 96.46 W 689.59 N 107.69 W 759.70 N 119.42 W 832.38 N 131.39 W 570.88 N 8 37 34 W 632.67 N 8 46 12 W 697.95 N 8 52 33 W 769.03 N 8 56 1 W 842.69 N 8 58 12 W 1.72 4.00 4.52 3.69 2.97 WEST EILEEN #Z-30 3/8/90 MEAS DRIFT DEPTH DG MN 3164 54 18 3308 56 12 3403 55 48 3497 55 30 3590 55 30 3683 55 24 3776 55 24 3871 55 30 3964 55 54 4059 56 6 4153 55 54 4247 56 24 4342 56 18 4436 56 24 4530 57 6 4624 57 6 4719 57 0 4813 57 0 4907 57 6 5000 57 0 5094 57 6 5189 57 0 5283 56 42 5377 57 12 5472 58 24 5566 59 6 5659 59 12 5752 59 6 5845 58 54 5940 58 48 RECORD OF SURVEY TRUVERT SUBSEA SECTION DIRECTION DEPTH DEPTH DIST ANGLE 2854.98 2766.32 954.52 2937.05 2848.39 1072.66 2990.17 2901.51 1151.31 3043.21 2954.55 1228.77 3095.89 3007.23 1305.31 3148.63 3059.97 1381.82 3201.44 3112.78 1458.27 3255.32 3166.66 1536.43 3307.73 3219.07 1613.22 3360.85 3272.19 1691.92 3413.41 3324.75 1769.78 3465.77 3377.11 1847.79 3518.41 3429.75 1926.84 3570.50 3481.84 2005.05 3622.04 3533.38 2083.61 3673.10 3584.44 2162.49 3724.77 3636.11 2242.18 3775.97 3687.31 2320.99 3827.09 3738.43 2399.85 3877.68 3789.02 2477.88 3928.80 3840.14 2556.76 3980.48 3891.82 2636.48 4031.88 3943.22 2715.18 4083.14 3994.48 2793.97 4133.76 4045.10 2874.35 4182.53 4093.87 2954.71 4230.22 4141.56 3034.55 4277.91 4189.25 3114.39 4325.81 4237.15 3194.11 4374.95 4286.29 3275.41 RELATIVE COORDINATES FROM WELL-HEAD 9.00 W 944.48 N 149.54 8.30 W 1061.44 N 167.34 9.00 W 1139.31N 179.18 9.00 W 1215.96 N 191.32 8.30 W 1291.73 N 202.85 N 8.30 W 1367.53 N 213.91 N 8.70 W 1443.24 N 225.22 N 7.60 W 1520.69 N 236.32 N 7.30 W 1596.87 N 246.28 N 8.00 W 1674.92 N 256.76 N 8.00 W 1752.10 N 267.61 N 7.30 W 1829.47 N 278.00 N 7.30 W 1907.91 N 288.05 N 7.30 W 1985.52 N 297.99 N 8.00 W 2063.43 N 308.45 N 6.90 W 2141.69 N 318.69 N 7.30 W 2220.80 N 328.54 N 6.90 W 2299.03 N 338.29 N 6.60 W 2377.36 N 347.56 N 6.40 W 2454.90 N 356.39 N 5.50 W 2533.35 N 364.57 N 5.90 W 2612.68 N 372.49 N 5.50 W 2690.99 N 380.30 N 5.50 W 2769.42 N 387.85 N 5.50 W 2849.43 N 395.56 N 5.20 W 2929.44 N 403.05 N 5.20 W 3008.96 N 410.29 N 4.80 W 3088.49 N 417.25 N 6.20 W 3167.84 N 424.89 N 5.50 W 3248.72 N 433.17 CLOSURE DISTANCE DG MN S W 956.25 N 8 59 50 W 1074.55 N 8 57 32 W 1153.31 N 8 56 16 W 1230.92 N 8 56 31 W 1307.56 N 8 55 29 W 138'4.15 N 8 53 25 W 1460.70 N 8 52 11 W 1538.94 N 8 49 59 W 1615.75 N 8 46 2 W 1694.49 N 8 42 56 1772.41 N 8 41 2 1850.47 N 8 38 25 1929.53 N' 8 35 8 2007.76 N 8 32 7 2086.36 N 8 30 7 . W 2165.27 N 8 27 49 W 2244.97 N 8 24 55 W 2323.78 N 8 22 14 W 2402.63 N 8 19 3 W 2480.63 N 8 15 37 W 2559.45 N 8 11 21 W 2639.10 N 8 6 50 W 2717.73 N 8 2 38 W 2796.44 N 7 58 20 W 2876.76 N 7 54 12 W 2957.04 N 7 50 2 W 3036.80 N 7 45 53 W 3116.55 N 7 41 38 W 3196.21 N 7 38 21 W 3277.47 N 7 35 41 DOG' LE deg/10 W 0.94 W 1.36 w o. 65 w W 0.51 W 0.10 W 0.29 W 0.79 W 0.48 W 0.55 W 0.21 W 0.74 W 0.10 W 0.10 W 0.91 W 0.82 W 0.24 W 0.18 W 0.68 W 0.31 W 0.43 W 0.53 W 1.26 W 0.78 W 0.10 W 0.33 W 1.12 W 0.54 WEST EILEEN #Z-30 3/8/90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST 6033 59 18 4422.78 4334.12 3355.16 N 4.10 W 3328.20 N 6128 59 36 4471.06 4382.40 3436.95 N 4.50 W 3409.78 N 6222 59 12 4518.91 4430.25 3517.84 N 4.50 W 3490.44 N 6316 59 24 4566.91 4478.25 3598.65 N 4.10 W 3571.04 N 6411 59 12 4615.41 4526.75 3680.30 N 3.70 W 3652.53 N DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 439.85 W 445.98 W 452.33 W 458.39 W 463.95 W 6505 59 36 4663.26 4574.60 3761.18 N 4.10 W 3733.26 N 6600 59 48 4711.19 4622.53 3843.17 N 4.10 W 3815.07 N 6693 59 36 4758.11 4669.45 3923.43 N 3.70 W 3895.18 N 6788 59 42 4806.11 4717.45 4005.37 N 3.70 W 3976.99 N 6882 59 42 4853.54 4764.88 4086.50 N 4.10 W 4057.96 N 469.45 W 475.31 W 480.77 W 486.06 W 491.58 W 6976 59 30 4901.10 4812.44 4167.54 N 3.70 W 4138.85 N 7071 59 6 4949.60 4860.94 4249.18 N 3.70 W 4220.36 N 7165 59 0 4997.95 4909.29 4329.75 N 3.40 W 4300.82 N 7257 58 42 5045.54 4956.88 4408.43 N 3.40 W 4379.42 N 7351 59 12 5094.02 5005.36 4488.94 N 5.50 W 4459.71 N 497.10 W 502.37 W 507.36 W 512.03 W 518.28 W 7445 57 54 5143.06 5054.40 4569.12 N 6.60 W 4539.45 7539 58 0 5192.95 5104.29 4648.78 N 6.90 W 4618.57 7631 58 48 5241.15 5152.49 4727.01 N 10.40 W 4696.02 7725 58 24 5290.13 5201.47 4806.92 N 11.10 W 4774.85 7818 57 36 5339.41 5250.75 4885.43 N 10.80 W 4852.28 526.73 W 536.10 W 547.88 W 562.84 W 577.83 W 7912 57 30 5389.85 5301.19 4964.31 N 12.50 W 4929.96 N 8007 57 18 5441.03 5352.37 5043.72 N 12.90 W 5008.04 N 8099 57 0 5490.93 5402.27 5120.35 N 13.20 W 5083.33 N 8192 56 30 5541.93 5453.27 5197.43 N 13.20 W 5159.05 N 8286 56 12 5594.01 5505.35 5274.95 N 13.60 W 5235.17 N 593.84 W 611.44 W 628.89 W 646.65 W 664.78 W 8381 55 48 5647.14 5558.48 5352.97 N 13.20 W 5311.78 N 8475 55 30 5700.17 5611.51 5429.89 N 13.20 W 5387.34 N 8569 55 0 5753.75 5665.09 5506.40 N 13.60 W 5462.47 N 8658 54 48 5804.93 5716.27 5578.47 N 13.90 W 5533.20 N 8752 55 6 5858.91 5770.25 5654.57 N 14.30 W 5607.84 N 683.04 W 700.76 W 718.66 W 735.96 W 754.71 W CLOSURE DISTANCE DG MN S 3357.14 N 7 31 42 W 3438.82 N 7 27 6 W 3519.63 N 7 23 2 W 3600.34 N 7 18 53 W 3681.88 N 7 14 20 W 3762.66 N 7 10 2 W 3844.56 N 7 6 6 W 3924.74 N 7 2 11 W 4006.58 N 6 58 5 W 4087.63 N 6 54 26 W 4168.59 N 6 50 55 W 4250.16 N 6 47 18 W 4330.65 N 6 43 41 W 4409.25 N 6 40 7 W 4489.72 N 6 37 44 W 4569.90 N 6 37 7 W 4649.58 N 6 37 15 W 4727.87 N 6 39 16 W 4807.91 N 6 43 22 W 4886.56 N 6 47 28 W 4965.60 N 6 52 7 W 5045.23 N 6' 57 39 W 5122.09 N 7 3 9 W 5199.42 N 7 8 40 W 5277.21 N 7 14 13 W 5355.52 N 7 19 39 W 5432.72 N 7 24 40 W 5509.54 N 7 29 42 W 5581.93 N 7 34 35 W 5658.39 N 7 39 54 W DOG LE deg/10 1.23 0.44 0.37 0.53 0.21 0.38 0.10 0.31 0.38 0.42 0.25 0.32 1.73 1.61 2 0.68 0.89 1.29 0.36 0.39 0.53 0.43 0.51 0.31 0.60 0.31 0.42 WEST EILEEN #Z-30 3/8/90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 8844 55 30 5911.29 5822.63 5729.40 N 13.60 W 5681.24 N 8937 55 42 5963.83 5875.17 5805.42 N 13.20 W 5755.89 N 9031 56 30 6016.26 5927.60 5882.83 ,N 12.20 W 5832.00 N 9125 56 54 6067.86 5979.20 5960.85 N 12.50 W 5908.75 N 9224 57 42 6121.35 6032.69 6043.51 N 12.90 W 5990.02 N 772.94 W 790.73 W 807.88 W 824.68 W 843.00 W CLOSURE DISTANCE DG MN S 5733.58 N 7 44 51 W 5809.95 N 7 49 20 W 5887.69 N 7 53 12 W 5966.02 N 7 56 44 W 6049.04 N 8 0 39 W 9317 58 36 6170.42 6081.76 6121.90 N 12.50 W 6067.08 N 9410 58 30 6218.95 6130.29 6200.68 N 12.20 W 6144.58 N 9503 59 12 6267.05 6178.39 6279.79 N 11.50 W 6222.48 N 9596 59 30 6314.46 6225.80 6359,34 N 11.80 W 6300.84 N 9690 59 30 6362.17 6273.51 6439.86 N 11.80 W 6380.12 N 860.37 W 877.33 W 893.68 W 909.83 W 926.40 W 6127.78 N 8 4 16 W 6206.90 N 8 7 33 W 6286,32 N 8 10 23 W 6366.19 N 8 12 60 W 6447.02 N 8 15 42 W 9793 59 30 6414.45 6325.79 6528.10 N 11.50 W 6467.04 N 944.32 W 9881 59 42 6458,98 6370.32 6603.67 N 10.40 W 6541.55 N 958.74 W 9974 59 54 6505.76 6417.10 6683.80 N 9.70 W 6620.70 N ~972.76 W . 10067 59 36 6552.61 6463.95 6763.86 N 10.80 W 6699.75 N 987.06 W 10160 59 12 6599.95 6511.29 6843.56 N 11.10 W 6778.34 N 1002.26 W 6535.62 N 8 18 27 W 6611.44 N 8 20 17 W .6691.78 N '8 21 31 W 6772.07 N 8 22 51 W 6852.04 N 8 24 39 W 10253 58 54 6647.78 6559.12 6922.99 N 10.40 W 6856.70 N 1017.14 W 6931.73 N 8 26 16 W 10347 58 18 6696.76 6608.10 7002.95 N 10.10 W 6935.65 N 1031.42 W 7011.93 N 8 27 31 W 10441 58 18 6746.15 6657.49 7082.74 N 9.00 W 7014.52 N 1044.68 W 7091.89 N 8 28 15 W 10534 59 18 6794.33 6705.67 7162.15 N 8.70 W 7093.12 N 1056.92 W 7171.43 N 8 28 30 W 10627 59 12 6841.88 6753.22 7241.95 N 9.00 W 7172.09 N 1069.22 W. 7251.36 N 8 28 45 W 10720 59 0 6889.64 6800.98 7321.63 N 8,30 W 7250.99 N 1081.22 W 10815 58 42 6938.78 6850.12 7402.82 N 8.70 W 7331.39 N 1093.24 W 10908 58 24 6987.30 6898.64 7482.08 N 7.60 W 7409.93 N 1104.49 W 11001 58 12 7036.17 6947.51 7561.15 N 7.90 W 7488.33 N 1115.16 W 11095 57 48 7085.98 6997.32 7640.82 N 6.90 W 7567.38 N 1125.42 W 7331.15 N 8 28 52 W 7412.46 N 8 28 53 W 7491.79 N 8 28 40 W 7570.91 N 8 28 13 W 7650.61 N 8 27 33 W 11187 57 6 7135.48 7046.82 7718.36 N 4.80 W 7644.52 N 1133.33 W 11282 56 30 7187.50 7098.84 7797.84 N 3.70 W 7723.80 N 1139.22 W 11375 56 0 7239.17 7150.51 7875.07 N 2.00 W 7801.02 N 1143.06 W 11468 54 54 7291.91 7203.25 7951.43 N 0.20 W 7877.60 N 1144.53 W 11555 55 24 7341,62 7252,96 8022.38 N 1.90 E 7948.99 N 1143,47 W 7728.08 N 8 25 58 W 7807.36 N 8 23 25 W 7884.32 N 8 20 10 W 7960.31 N 8 15 60 W 8030,81 N 8 11 9 W DOG LE deg/10 0.67 0.36 1..l 2 0 1.01 0,25 0,93 0.40 0.00 0.21 0.95 0.60 0.93 0.49 0.63 o° 1.10 0.26 0.59 0.44 0.91 0.31 0.87 1.78 1.02 1.36 1.75 1.73 WEST EILEEN #Z-30 3/8/90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 11673 58 30 7405.97 7317.31 8120.65 N 0.20 W 8047.87 N 1142.01 W 11750 58 54 7445.97 7357.31 8186.10 N 0.80 E 8113.66 N 1141.66 W 11844 59 12 7494.31 7405.65 8266.16 .N 1.50 E 8194.26 N 1140.04 W 11939 60 36 7541.96 7453.30 8347.75 N 1.20 E 8276.42 N 1138.11 W 12031 62 6 7586.07 7497.41 8427.80 N 2.60 E 8357.11 N 1135.43 W CLOSURE DISTANCE DG MN S 8128.49 N 8 4 35 W 8193.59 N 8 0 34 W 8273.18 N 7 55 14 W 8354.31 N 7 49 47 W 8433.89 N 7 44 13 W 12125 62 48 7629.54 7540.88 8510.22 N 3.30 E 8440.34 N 1131.14 W 12219 63 30 7672.00 7583.34 8593.17 N 2.60 E 8524.09 N 1126.83 W 12290 63 54 7703.46 7614.80 8656.15 N 2.90 E 8587.67 N 1123.77 W 12398 63 6 7751.64 7662.98 8751.56 N 4.30 E 8684.13 N 1117.70 W 12524 61 0 7810.70 7722.04 8861.33 N 3.60 E 8795.16 N 1110.04 W 8515.80 N 7 37 59 W 8598.25 N 7 31 50 W 8660.89 N 7 27 19 W 8755.76 N 7 20 2 W 8864.93 N 7 11 36 W 12593 59 48 7844.78 7756.12 8920.46 N 4.70 E 8855.00 N 1105.69 W 12687 60 6 7891.85 7803.19 9000.58 N 4.30 E 8936.11 N 1099.31 W 12779 60 6 7937.71 7849.05 9079.24 N 3.60 E 9015.68 N 1093.82 W 12867 59 54 7981.71 7893.05 9154.51 N 3.30 E 9091.75 N' 1089.23 W 12967 59 36 8032.09 7943.43 9239.82 N 3.60 E 9177.97 N 1084.03 W 8923.76 N 7 7 3 W 9003.47 N 7 0 48 W 9081.79 N 6 55 3 W 9156.76 N 6 49 54 W 9241.77 N 6 44 10 W 13061 59 36 8079.66 7991.00 9319.87 N 3.60 E 9258.89 N 1078.94 W 13154 59 42 8126.65 8037.99 9398.97 N 4.70 E 9338.93 N 1073.13 W 13249 59 12 8174.93 8086.27 9479.47 N 4.70 E 9420.47 N 1066.43 W 13341 59 6 8222.11 8133.45 9557.16 N 5.00 E 9499.17 N 1059.75 W 13432 58 48 8269.05 8180.39 9633.84 N 4.70 E 9576.85 N 1053.16 W 9321.54 N 6 38 48 W 9400.39 N 6 33 18 W 9480.64 N 6 27 31 W 9558.10 N 6 21 57 W 9634.59 N 6 16 32 W 13522 58 30 8315.87 8227.21 9709.43 N 5.00 E 9653.44 N 1046.66 W 9710.01 N 6 11 17 W 13613 58 12 8363.62 8274.96 9785.44 N 6.10 E 9730.54 N 1039.17 W 9785.87 N 6 5 45 W 13704 57 48 8411.84 8323.18 9861.17 N 5.00 E 9807.35 N 1031.71 W 9861.47 N 6 0 19 W 13796 57 36 8461.00 8372.34 9937.53 N 5.70 E 9884.77 N 1024.46 W 9937.72 N 5 55 1 W 13887 57 12 8510.03 8421.37 10012.75 N 5.40 E 9961.08 N 1017.04 W 10012.86 N 5 49 47 W 13978 56 18 8559.93 8471.27 10087.37 N 6.10 E 10036.79 N 1009.42 W 10087.43 N 5 44 35 W 14070 55 48 8611.31 8522.65 10162.17 N 5.70 E 10112.71 N 1001.57 W 10162.18 N 5 39 22 W 14161 54 54 8663.04 8574.38 10235.50 N 6.40 E 10187.15 N 993.68 W 10235.50 N .5 34 16 W 14237 54 30 8706.96 8618.30 10296.18 N 6.40 E 10248.79 N 986.77 W 10296.18 N 5 29 58 W DOG LE deg/10 2.92 1.08 0.~6~ 0.95 0.95 0.65 1.26 1.72 2.10 0.45 0.57 0.34 0.37 0.00 0.26 0.40 0.41 0.93 0.97 0.58 0.49 1.12 0.62 1.11 0.52 WEST EILEEN #Z-30 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3/8/90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 89 89 0 0 0 189 189 100 0 0 289 289 200 0 0 389 389 300 0 0 489 489 400 0 0 589 589 500 0 0 689 689 600 0 0 789 789 700 0 0 889 889 800 0 0 989 98.9 900 0 0 1089 1189 1290 1392 1495 1599 1705 1811 1919 2027 2138 2251 2367 2491 2617 2748 2892 3052 3223 3400 1089 1000 0 0 1189 1100 0 0 1289 1200 1 1 1389 1300 3 2 1489 1400 6 3 1589 1500 10 4 1689 1600 16 6 1789 1700 22 6 1889 1800 30 8 1989 1900 38 8 2089 2000 49 11 2189 2100 62 13 2289 2200 78 16 2389 2300 102 24 2489 2400 128 26 2589 2500 159 31 2689 2600 203 44 2789 2700 263 60 2889 2800 334 71 2989 2900 411 77 RELATIVE COORDINATES FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.02 S 0.01 E 0.58 S 0.26 E 1.13 S 0.52 E 1.69 S 0.77 E 2.24 S 1.02 E 2.61 S 1.62 E 0.79 S 2.84 E 6.36 N 3.27 E 19.81 N 2.07 E 38.89 N 1.73 W 62.81 N 6.72 W 91.45 N 11.77 W 124.72 N 16.98 W 161.71 N 22.21 W 200.83 N 27.78 W 242.85 N 33.02 W 289.46 N 39.30 W 341.45 N 48.01 W 399.99 N 58.09 W 470.87 N 69.77 W 546.75 N 82.54 W 629.98 N 97.29 W 732.59 N 114.88 W 855.53 N 135.14 W 992.48 N 156.85 W 1137.09 N 178.85 W WEST EILEEN #Z-30 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3/8/90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 3577 3089 3000 488 77 3753 3189 3100 564 76 3930 3289 3200 641 77 4109 3389 3300 720 79 4288 3489 3400 799 79 4469 4653 4836 5020 5204 5387 5578 5773 5967 6163 6359 6555 6753 6951 7147 7341 7531 7722 7910 8095 8276 8455 8630 8804 8982 3589 3500 880 81 3689 3600 964 84 3789 3700 1047 83 3889 3800 1131 84 3989 3900 1215 84 4089 4000 1298 83 4189 4100 1389 91 4289 4200 1484 95 4389 4300 1578 94 4489 4400 1674 96 4589 4500 1770 96 4689 4600 1866 96 4789 4700 1964 98 4889 4800 2062 98 4989 4900 2158 96 5089 5000 2252 94 5189 5100 2342 90 5289 5200 2433 91 5389 5300 2521 88 5489 5400 2606 85 5589 5500 2687 81 5689 5600 2766 79 5789 5700 2841 75 5889 5800 2915 74 5989 5900 2993 78 RELATIVE COORDINATES FROM WELL-HEAD 1281.33 N 1424.91 N 1569.15 N 1715.75 N 1863.57 N 201.27 W 222.48 W 242.65 W 262.50 W 282.37 W 2012.97 N 2165.51N 2318.48 N 2471.75 N 2625.15 N 301.68 W 321.66 W 340.59 W 358.15 W 373.73 W 2778.14 N 2939.67 N 3106.31 N 3271.51 N 3439.44 N 388.69 W 403.98 W 418.96 W 435.09 W 448.32 W 3607.59 N 3776.62 N 3947.25 N 4117.69 N 4285.37 N 460.88 W 472.56 W 484.14 W 495.66 W 506.40 W 4450.83 N 4611.77 N 4772.49 N 4928.14 N 5079.90 N 517.59 W 535.29 W 562.40 W 593.47 W 628.09 W 5227.35 N 5370.94 N 5510.72 N 5649.53 N 5791.94 N 662.92 W 696.91 W 730.46 W 765.07 W 798.85 W WEST EILEEN #Z-30 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 3/8/90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 9163 6089 6000 3074 81 9352 6189 6100 3163 89 9545 6289 6200 3256 93 9742 6389 6300 3353 97 9940 6489 6400 3451 98 10138 10331 10523 10718 10911 11100 11284 11462 11641 11833 6589 6500 3549 98 6689 6600 3642 93 6789 6700 3734 92 6889 6800 3829 95 6989 6900 3922 93 7089 7000 4011 89 7189 7100 4095 84 7289 7200 4173 78 7389 7300 4252 79 7489 7400 4344 92 12037 7589 7500 4448 104 12257 7689 7600 4568 120 12477 7789 7700 4688 120 12681 7889 7800 4792 104 12881 7989 7900 4892 100 13079 13276 13470 13660 13847 14029 14205 8089 8000 4990 98 8189 8100 5087 97 8289 8200 5181 94 8389 8300 5271 90 8489 8400 5358 87 8589 8500 5440 82 8689 8600 5516 76 RELATIVE COORDINATES FROM WELL-HEAD 5940.35 N 831.80 W 6096.21N 866.74 W 6258.19 N 901.04 W 6424.16 N 935.48 W 6591.77 N 967.63 W 6759.60 6922.60 7083.88 7249.37 7412.11 998.64 W 1029.06 W 1055.48 W 1080.98 W 1104.78 W 7571.56 7725.53 7872.89 8021.27 8184.83 1125.85 W 1139.30 W 1144.44 W 1142.40 W 1140.23 W 8362.08 8557.77 8753.73 8930.61 9103.64 1135.17 W 1125.21W 1112.90 W 1099.74 W 1088.51 W 9274.23 9443.37 9608.93 9770.42 9927.81 1077.83 W 1064.49 W 1050.44 W 1035.30 W 1020.27 W 10079.25 10223.10 1005.03 W 989.65 W WEST EILEEN #Z-30 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH 3/8/90 MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH 1000 1000 911 2000 1964 1875 3000 2757 2668 4000 3328 3239 5000 3878 3789 6000 4406 4317 7000 4913 4824 8000 5437 5348 9000 5999 5910 10000 6519 6430 11000 7036 6947 12000 7571 7482 13000 8049 7960 '14000 '8572 8483 RELATIVE COORDINATES FROM WELL-HEAD 2.59 S 1.79 E 231.79 N 31.74 W 814.60 N 128.46 W 1626.45 N 250.25 W 2454.90 N 356.39 W 3300.00 N 4159.44 N 5002.29 N 5806.90 N 6642.80 N 437.48 W 498.43 W 610.14 W 802.22 W 976.76 W 7487.49 N 8329.92 N 9206.38 N 10054.95 N 1115.04 W 1136.33 W 1082.25 W 1007.54 W 950 i900 ~BSO 4750 5700 i ) I VERTICAL SECTION BP EXPLORATION WEST EILEEN #Z-30 SECTION AT N 5.56 W TVD SCALE' t ~nch = t900 feet IDEP SCALE' I inch = i900 feet DRAWN , 3/8/90 Marker Identification MO TVD DEPRT A) KB 0 0 0 8) TVD i4237 B707 102g§ 6650 7600 8550 ,i t0450 ti400 i2350 13300 ....... ~ ............ -950 950 tgo0 ~850 ~00 4750 5700 66§0 7600 Depar'tL~r-'e 8~50 9500 t0450 10400 Marker Identification MD TVD DEPRT AJ KB 0 0 0 B) TVD 14237 B707 t0296 PLAN VIEW BP EXPLORATION NEST EILEEN #Z-30 CLOSURE: 10296 ft N 5.5 W DECLINATION: 30.00 deg E SCALE: t inch = 1600 feet DRAWN: 3/8/90 9600 BSO0 8000 7200 6400 5600 4800 4000 3200 2400 t600 BO0 4~00 4000 3200 2400 1600 BO0 0 800 t600 2400 3200 4000 4BO0 COMPLETION DATE ~ i/''~ I ?~ .CO. CONTACT & NO. · form ' received receiVed dale ' comments ~ ~ .... no ~/~,~.//~; ..................................... completion report 403' yes no sundry application 404 ' yes no report of Sundry applicafl°n hole Io9 ....... hole log , Io9 ........ MUD GCT 1EMP 'DlUS~L ~ ~' " 'CNL PflOD .... _ ,~, BHCISL CET ~' / SPINNER BHCIAC E~ OTHER DATA ,i ....... i i i ,,~ LSS PERF sss " -mc[[n ......... '" Data FDC- Well CNI_. Tesl~ FDC RWD ,cquhcd' received S~MPLEs requi,ed received LDT!CNL ~~ ~ ~ d. ditch ML core CYBER .............. core "' LOOK ..... Analysis , , ..... , ~I ,,, ~- ,, ,, ....... , ............ i ill, , i i i i BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO ARCO EXXON PHILL_I~ Date: 03/23/90 T#: 80982 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. 0H/DIL/BHC/DSN API#50-029-22013 #1 03/03/90 800bpi TP#06970 9990.50-14991.50 JTN#378873 Z-30 **ARCHIVES ONLY: OH/ EWE/LIS Tape w/repeat API#50-029-22013 JTN#378873 #1 03/03/90 TP#06971 800bpi 800bpi Information Control Well Records LR2-1 J. Dietz/S. McCurry RECEIVED Alaska Oil & Gas Cons. C0mmissi0_s Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alast<a 99519-6612 (907) 561-5111 To: Distribution Date: 03/15/90 Transmittal: 80970 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well RecOrds at (907) 564-4445. C-14 Tubing Puncher 03/10/90 #1 9945-10270 Sch 5" H-21 TDT-P Borax 03/09/90 #1 9130-9886 Sch 5" J-08 Collar 03/09/90 #1 12040-12284 Atlas 5" M-12i Perf 03/07/90 $1 9960-10313 Sdh 5" W-40 TDT-P 03/08/90 #1 9917-10531 Sch 5" Z-30 CET 03/08/90 #1 13990-14902 Sch 5" Z-30 CBT 03/08/90 #1 14402-14884 Sch 5" Z-30 TCP Gun Positioning 03/08/90 #1 14287-14560 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ARCHIVES MAR ~ 2 1990 1"' A.:,ska Oil & Gas Cons. Comm~sslo.u Anchorage M EMORAN D" "M State f Alaska ~ASKA OIL g~D GAS CONSERVATION COmmISSION TO: Lonnie C. Smi '--~-~ ~ ~"~ ~ DATE: Commissioner / '~ FILE NO: February 14, 1990 JT. BDF. 22 THRU: S ~v/zP e tl~ eum~n g~t~neer TELEPHONE NO: SU BJ ECT: BOP Test BPX PBU Z-30 Permit. #90-23 Prudhoe Oil Pool FROM: bby "~5 ~'~ Bo D. Foster / Petroleum Inspector Thursday, February 8, 1990: The test began at 1:00 p.m. and was ~~-~~~-~.m. As the attached BOPE test report shows, there were 9 failures. The failures consisted of leaking AP1 flange rings, internal mud seals in blind rams, blind ram sealing elements, frozen hydraiic lines on blind ram control lines, and an upper-belly valve leak. Before i left, all of the above failures were corrected except for the upper-belly valve. The AOGCC will be notified when it is repaired and replaced. in summ;~ry, I witnessed the BOPE Test on A.U.D.I. Rig 2 upon BPX's Z-30. Attachment - Sunday, February 1!, 1990, i was notified by Lewis Brown, BPX Representative, that the upper-belly valve had been repaired and tested 02-001A (Rev. 8~85) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report Wel 1 si gn ~-"/ Rig ~ Location (general) !~" General housekeeping ~ Audio Reserve pit MUD SYSTEMS: .Visua1 Trip tank ~ I~ Pit gauge Fi" I Flow monitor .... ~ I Cas detectors '~,-/ ,I BOPE STACK: Annular preventer Pipe rams Blind rams Choke line valves HCR valve . Kill line valves Check valve Test Pressure Rig # Representative Permit, ACCUMULATOR SYST~ ft Pump incr clos press 200 psig Full charge press attained 2 Controls: Master psig psig --' min 1~ ~.. min 4J psig. sec sec RemoteL~ ~ Blind switch cover/-~---~ KELLY AND FLOOR SA~'ETY VALVES: Upper Kelly Lower Kelly Ball type Inside BOP Test pressure~_~/~r~ Test pressure~/~:~ Test pressure Test pressure~ Choke manifold ~:j~. Test pressur~//'.~'~:~::~_ Number valves , Number fl anges 2~ Adjustable chokes ~ Hydraulically operated choke TEST RESULTS: Failures .~ Test time /~,, ..... hfs Repair or replacement of failed equipment to be made'within ~ and Inspector/Commission office notified. days (1,,~ Distribution: c - Operator c - Supervisor C.004 (rev 03/17/89) January 26, I990 Telecopy.. (907)276-7542 G. W. Kirton PBU Lead Engineer BP Exploration (Alaska) !nc. P.O. Box 196612 Anchorage, Alaska 99519-66!2 Re: Prudhoe Bay Unit Z-30 BP Exploration (Alaska) InC' Permit No. 90-23 Sur. Loc. 7!4'S~L, 3648'~L, Sec. 19, TllN, R12E, UM Btmhole Loc. 538'S~Vb, 4632't~L, Sec. 7, TllN, R12E, UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other gove~ental agencies, and does not authorize conducting drilling operations until all other required permitting determinations., are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the'Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a dlverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling bel~ the shoe of the conductor pipe. V~ t ly yours, ,- i ' ':, .---- / <.,<%/.//.<< ~. V. c~att~rto~ Chaiman of Alaska Oil and Gas Conse~ation Co~ission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 22, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Z-30 (1!,.-07-11-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above-named well. Also included are the attachments listed on the application form, and a check in the amount of $100 to cover the permit filing fee. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH CC S. A. Leach Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PER IT TO DRILL 2O AAC 25.OO5 la. Type of work Drill ~ Redrillr"lllb. Type of well. Exploratoryl-I Stratigraphic Testl-I Development Oill[] Re-Entry [] DeepenI-!I Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exo/oration KBE = 92 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADb 47450 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 ,,.Ac 25.025) 714' SNL, 3648' WEL, SEC. 19, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 780' SNL, 4609' WEL, SEC. 7, T11N, R12E Z-30 (11-07-11-12) 2S100302630-277 At total depth 9. Approximate spud date Amount 538' SNL, 4632' WEL, SEC. 7, T11N, R12E February 5, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property l5. Proposed depth(uDandTVO) property line ADL 28240 @292 feet Z-31 @1497'/22 feet 2560 14827'MD/9117'TVDf e e t 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.o35 (e)(2)) Kickoff depth 1000 feet Maximum hole angle ,57,55 Maximum surface 3330 psig At total depth (TVD) 8800'/,d.390 pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD M D TVD (include stage data) 20" Cond. 80' Sudace 110' 110' 17-1/2" 13-3/8" 68# L-80 Butt 2855' Surface 2886' 2680' 4009 cu ft Permafrost 12-1/4" 9-5/8" 47# NT80-S NSCC 14064' Surface 14094' 8724' 3209 cu fl Class G 8-1/2" 5-1/2" 17# L-80 NSCC 983' 13844' 8576' 14827' 9117' 402 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~): ~: ~ I\?' Intermediate Production : !!:'~ ?'!i '?. '.:::; i!* Liner Perforation depth: measured ::ii :.. ::~; i:.:i,. true vertical . ~ 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby ce_rtify that the foregoing is true and correct to the best of my knowledge Commission Use Only Permit Number IAPI number . IApprevel/~e:~ JSee cover letter ~'~ "'~----. ~ 150'~2;)~-~-' ~'~-d~l/~ I 0't/25/cJ0 Ifor other requirements Conditions of approval Samples required [] Yes ~;l~No Mud Icg required [] Yes '~'No Hydrogen sulfide measures [] Yes '~[' No Directiona~ I survey requ~reo '~'Yes I-I~'No' Required workin, g,,p?'Slssure~for B~3FE~I-1~2,~I; I~SM;/J~5M; I-]10M; []I~M; Other: /~ j/~ /~ ~_.Z,,~ ~_ bv order of Approved by (k~ ~ .-~', ~,~ //~,~,,,~,~~ Commissioner t~e commission Date Form 10-401 Rev~- 12-1-85 // /' Submit AFE No. PROPOSED DRILLING AND COMPLETION PROGRAM WELL Z-30 [11-7-11-12] PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. The Drilling fluid program will consist of an 9.5-10.0 ppg spud mud in the 17- 1/2" hole, a 9.5-10.4 ppg water base mud in the 12-1/4" hole and a 9.4 ppg water base mud in the 8-1/2" hole. Drill 17-1/2" hole to 2915' MD and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9-5/8" 47# NT80-S NSCC casing to within 10' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directionally drill 8-1/2" hole to TD. Run 5-1/2" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to NaCL completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The well will be perforated with rig on location. Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13- 3/8" annulus of the well. Tubing Size: Tailpipe Size: 3-1/2", 9.2# L-80, EUE 8 Round A/B Mod IPC TBG with 6 GLM's. 3-1/2" TAILPIPE sal: 1/11/90 PROPOSED DOWNHOLE DIAGRAM WELL Z-30 [11-%11-12] PBU PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 2100 13-3/8" Casing Shoe 17-1/2" Open Hole 2886 2915 3-1/2" 9.2# L-80 EUE 8RD A/B MOD Butt IPC. Tubing with 6 GLM's 9-5/8" Packer 13794 5-1/2" Tieback Assembly 13844 9-5/8" Shoe 14094 12-1/4" Open Hole 14104 5-1/2" 17# L-80 NSCC Liner 5-1/2" PBTD 14807 5-1/2" Liner Shoe 14827 8-1/2" Open Hole 14827 SAL: 1/11/90 SURFACE HOLE DIVERTER SYSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. Valves" 35' or as required 43' Dresser Sleeve 10" Diverter Line 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. F'uti 2. Manual 10" !~ valvds- mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening ball valve wi Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet KRL 12/18/89 BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM ST ACK DRILLING I RISER I ANNULAR PREVENTER I PI PE RAMS I I I I I BLIND RAMS I 2" KILL LINE MANUAL HYDRAULIC GATE GATE DRILLING SPOOL I PI PE RAMS I I 4" CHOKE LINE I HYDRAULIC MANUAL GATE GATE NORTH WELL I~ Z- 30 i SURFACE lOCATION LAT. · 70° 17 ' 54. 294" LONG. · 149° II ' 52. 462" y · 5t 959, 359. 99 &'$'P' X · 599, 043. OI ZONE 714' FROM N. LINE SECT 1:323' FROM W. LINE SECT. T. IZ N, T. II N. T. II N. T. ION. E.N.W, 34 ~CALE : I ( MILES TW. 'C' CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAN*:) SURVEYING IN THE STATE OF ALASKA AND THAT THiS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY IUP~RVI~4ON~ &ND THAT ALL DIMENSIONS AND OTHER DETAILS AR.,,E CORRECT. SURVEYOR DATE: SHEET I-OF 2 WELL PAD 'Z' WELL N° Z- 30 AS-BUILT LOCATED IN PROTRACTED SECT 19 t T. II N. · R. 12 F._, U,M. SURVEYED FOR : · 'rANI:UtRD ALASKA I~ODUCTJO~,,~ CO. PREPARED IY : KUUKPIK - TECHNICAL SERV. INC. PRUDHOE BAY OFFICE DATE: NOV. 20,86 DRAWN BY: ~.T. CHKD. BY: R.H. -~~ii ii i i i ~m, - NW CORN. OF SECT. 19 NORTH LINE OF SECTION 19 SUMP · · · · · · · · · · · · · · · · SUMP 1 NORTH SHEET 2 ~ 2 WELL PAD 'Z' _ _ WELL N® Z-SO AS-BUILT LOCATED IN IURYEYED POR : STAH~D AL,~,~,~ PS~:~C)C~TK~)N CO. PR~PARIrD BY s J ~.UUKPIK ' . }, OAl*E: ,Or. ~.M ECHNICAL SERV. INC. I DIIAWN BY s iT: f_ _$4$DUAi~4:[DRANSRC. ~TEST. RUN]Z30_CLOSAP_SHORT7..LIS~I --- ~iosest App~igsls --- Date: Il-dAN-90 Time: 14:16:09 Sea. ch Radius= 200 7 DEGREE LEAD LINE Fo~ p~oposed well:.'Z-30 [11- 7-11-12] Il-dAN-1990 14:16 Page 1 Location = W-E S-N TVD(SBS) Top 599043.00 59~9359.00 -92.00 Note: All depths in ~eet Belo~ Kellg Bushing Closest Approach -'-I~L-L---I]:)ENT /PROPOSED\ /NEAI~Y\ CL-OSE~T TVD DEPART TVD DEPART DISTANCE '---A-029-2006200 Vertical Intersection /PROPOSED\ /N~RBY\ ~~E TVD DEPART TVD DEPART DISTANCE 71112 A029-2006201 ---'--71112R . :.A029-20,511 O0 CHEVTR ~-2178700 Z-8 A0~9-~178701 .: ,.- Z~:8oi-g 6640.2 6891.9 6283.9 777.0 1870.8 ~507. ~ ~110. 8 5410. 8 1553' 7 0.4 0.0 0.0 0.0 A0~?-~187~00 Z-28 A029-218~500 Z-~ A029--2189501 Z-33A 267. 5 300.4 0.0 3000 0.~ 6~.9 1398.0 34.8 1398.3 6.0 99.1 6350.8 ":6436.7 7036.0 6427.7 685.8 Z-32 A027-2193800 ~ Z--~! A029-21 ? 5400 Z-2~ AO2*~21Z-09 ?6700 1264.5 15.8 1264.2 0.6 67.4 100.2 0.0 100.0 0.2 3~.0 998.4 0.0 1000.0 3.1 276.4 5117.0 4495.9 832~.5 4479.3 3212.7 SUMMARY 15 33¸ _.]44 4~ 47 S3 531 ~'~J The well which comes closest to the p?oposed ~ell is: Closest approach dlst~nce = KtC~ OFF ~or this Tun = 2y. 1 ~eet 1000.0 ~eet _$45DUA124: [DRANSRC. GTEST. RUN]Z30_CLOSAP_SHORT. LISt 1 _ 4 5 --- s I-o~.--~p'r om-~AS.,Sm--I g s i s --- Date: fl-daN-90 Time: 14:15:03 Il-daN-1990 I4'15 Page I Search Radius= 200 COURSE LINE For proposed well: Z-30 [11- 7-11-12] Location = W-E S-N TVD(SBS) Top 599043.00 5959359.00 -92.00 Note: All depths in Feet Below Eellg Bushing (BKB) Closest Approach WELL IDENT /PROI~OSED\ /NEARBY\ CL~S~I TVD DEPART TVD DEPART DISTANCE AO~-~O06~O0 Vertical !nte~section /M~OPO~D\ /NEA~Y\ vE~TiCAu TVD DEPART TVD DEPART DISTANCE 71112 A0~9-2006201 .... 7ilI~ A029-2051100 CHEVTR 5564.0 Z-8 0.4 A029-2178701 ?A029-~187100 Z-31 Z-~8 300.4 A02~-2189500 6858. 4 7~35. 0 6691. 6 851. 3 1016. 7 5199.0 5454. 2 1588. 2 758. 0 .... O. 0 O. 0 O, 0 267. 5 0~0 0.0 0.0 ~57_ 5 O. 0 :300. 0 O. 2 69. 9 754~.8 8317.8 8913.8 8313.0 13~7.7 . A02~-218~501 - Z-33A Z--32 A0~9-21~3800 Z--~I A02~-2195400 131~.~ 22,8 I31~.~ 1190.8 8.1 1190.6 100.~ 0.0 100.0 0.7 68.8 0.2 35.0 2940.8 1072.8 3711.8 1076.2 971. a ~uo9.8 4405.9 0972, i 440~.9 £9ia. 4 AO29-alg6700 Z-09 998.4 0.0 1000.0 3.1 276.4 .. J68 The well which comes closest to the proposed well is: A029-~187100 Z-31 Closest approach distance = 27.1 ~eet .. TOTAL Acrl~,£ ~3~g~ · ~ee ~tc m~O rAN~ ~.~ ~ ~L · PLJ HI~, /1UD la~ 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1- Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1 - Drilco Atmospheric Mud Degasser ~0 ~L 50 eec 1- 200 gpm Operating Capacity. Centrifuge 15 - Brandt MA5 Mud Mix Agitators 1 - 150 bbl. Trip Tank 1 - P~cording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 0£~co IZ 3 rr~ ~. T^~Jr. Z ,) CURL rA.~I D E H TO 1 - Drilling fluid flc~ s~or with readout at drili%~.',s console MUD WEIGHT CALCULATIONS WELL Z-30 (11-7-11-12~ C~m~nt Calculations 13-3/8" CASING Measured Depth: 2886' Basis: 2 X Annular volume Total Cement Vol: 4009. (cu ft) 9-5/8"CASING Measured Depth: 14094' Basis: 90% Annular Volume to. 13-3/8" + 50 cuft Total Cement Vol: 3209 (cu ft) Lead Slurry Vol: 2979 (cu ft) Tail Slurry Vol: 230(cu ft) 5-1/2" LINER Measured Depth: 14094' (Shoe) Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cuft Total Cement Vol: 402 (cuft) sal: 1/11/90 CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE . pATE (1) Fee /~/~C ///'~.~//z~'~:5 1. Is (3) Admin~___ ~ 9. ' 9-~-'~--~'~'~u/~ 10. //.z/.¢~ /-Z5'-¢¢ 11. (10 and 13) 12. 13 (4) (14 thru 22) (23 thru 28) th~u 31) (6) Eng~peering: . nos sw./ (6) Add: Geology: rev: 01/30/89 6.011 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. For 29.. 30. 31. Company ~/~ ~~/~/~/~) YES the per, nit fee attached .......................................... ~ Is operator the only affected party ................................. Can permit be aPproved before, fifteen-day wait ...................... Lease & Well No./~~ NO 2. Is well'to be located in a defined pool ............................. 3. Is we~] located proper distance from property line .................. 4. Is we~ located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. 8. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate ~ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~O~O psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................ ' Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. 32. Additional Remarks: Z-.~O /~¢~,V ~ ~.~',, INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE O ~Z Well Histo.ry File APPENDIX Information of detailed nature that.is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi ,, No special'effOrt has been made to chronologically organize this category of information. MAR 291990 Alaska Oil .a Gas Cons, Commissi~ AnchOrage DIRECT DiGiTAL LOGGING ii ilCROFILMED COMPUTER PROCESSED ANALYSIS .L .L ,L .L ,k .L .L ,L ,C ,L .L. LLLLLLLLLL ,LLLLLLLLLLL IIIIIIIIII iiitiiiiii ii ii 11 ti ii Ii 11 Iiiiiiiiii iililiiiii :. ~.. ~. ~,DDDD UU UU D [:' f) D D D D D D D U U U U D 0 D D U U U U D D D D U U U LJ D iD D D U U U U DD OD UU UU DD [:'D UU UU DD DD UU UU i.:) I) LZ~L,~ UU UU D D D D U U U U D[:,DDDDDDDD UULiUUUUUUUUU b D D DD DD DD UUUU UU U L.i' ' o U PPPPPPPPPP PPPPPPPPPP PP PPPPPPPPPP P' MP'P'H P'I-' I~ I~ t'~' PP P' PP PP PP 999999 9999 999999999999 99 99 999999999999 999999999999 99 99 99 999999999999 9999999999 ~;~z~'.22 z~ MMM MMM 22 ~ MMMM MMMM 22 MM MM MM MM z~ MM MMMM MM 22 M M M M M M 22 MM MM 22 MM MM 22 MM MM 5.~ 55 5555555555 55 AA AAAA AA AA AA AA AA AA AA .AA AAAAAAAAAAAA AAAAAAAAAAAA AA AA AA AA AA AA AA AA 8888888888 888888888888 88 88 88 88 88 88 88888888 88888888 88 88 88 88 88 88 888888888888 8888888888 RRRRRRRRRRR RRRRRRRRRRRR RR RR RR RR RR RR RRRRRRRRRRRR RRRRRRRRRRR RR RR RR RR RR RR RR RR RR RR AA A A K1A AA AA A A A A AA AA AA AA AAAAAAAAAAAA AAAAAAAAAAAA AA AA AA AA AA AA AA AA 9999999999 999 '~ '.~ '~ 999999 ~ 99 99 99 99 99 999999999999 ., ~ ... 99 99 99 999999999999 999999q'~'-...~ MM M M M M H bi MM MM MM M M M M M t'i MM MH M M t~t P1 M M MM MM 0 0 0 0 0 0 O0 000000000 O0 O0 O0 O0 O0 O0 O0 O0 000000000 00000000 name: &GSF01 HEaD= R E C 0 R D c. · '22 Origin: Raai name 3~''''' Data: 90?03., : ,,a1:~73 Continuation ~: 0i TAPE HEADER Servicz name: &GSFO] Previous taps: ,)ate: 9070D./22 Origin: Tape name:: Comments: Var~ion ~: Maximum te:ngth: t024 Film type: LO Pravious ?ilm: H N E CN WN FN COUN STAT CTRY A P i N LATI LONG SECT T 0 W N RANG EK8 EDF EGL :PD LMF DMF RUN Tit'iE DATE LCC SON LUN FL LUL ENGi lltt TN DD DL ~CBD i CSL. i TLi BL. i TCS TLA8 8HT MRT biT MSS DFD MViS DFPH DFL Rt, l RHF biFST t'iFSS Rt'iC 1 NFORMAT 1 ON RECORDS CONTENTS U N i T 8P EXPLORATION Z-,-~ 0 PRUDHOE 8AY (EWE HORTN SLOPE ALASKf~ LiSA 220i ~, 000 ..... ~ ~_g 0 Nih 0 D~_g. 0 M i n i~ N i2E '0.000 89. 000, . O. 0 u 0 bl S DF i65Z , 000 ~0 ........ G-.Z6 i i , NORTH SLOPE NORTH SLOPE McKAY '~' ' "SHIRZAD ~.~:RNDT,' ~4970. 000 .............. ~4~27, ~ 4~34 ~ 4 ~07, ~ 00 .............. 20g, 000 ............... ~i 4J ~Og, 000 ....... D i SPE~ ED CIRCULATED 9,500 ................. ~5. 000 FT FT lJlill&l .... FT . , FT FT HR DEGF DEGF 5:.600 ................................................... 2. 200 ................................................... 2.i30 ................................................... 7i ,000 ...................... ............................ HEASURED ............................................ 2.4.90 ................................................... LE-:,.'G CF' 0 i.-i i"l N 0 H H bi DEGF 0 H N bi TYPE CATG 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 3 0 0 0 -' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3 0 3 0 .3 0 0 2 0 4 0 i 0 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 40 40 40 20 '20 20 4 ,.I; 3 4 4 4 2 2 .5 4 ~0 ~ 0 20 0 4. 4- 4, ,4 ;~u 0 4 4 4 4 4 4 4 C iD D E ERROR MNEM MCST MCSS CS BS I NF ORMA T I ON RECORD©o CONTENTS F{.O00 MEASURED 9,625 8~500 UNIT T?PE DEGF' C A T G 4 ~2 4 4 CODE ERROR 68 68 Cc MMENT_ RECOR[) Well Location Comment ~: SURFACE: ?~4' FNL & 3648' FEL Wmtt Locmtion Comment 2: Wmll Location Commmnt 3: Well Location Commmnt 4: Well Film Commmnt ~: GR MERGED FROM MAIN PASS TO BOTH REPEAT SECTtONS~ PULL. ED W~ll Film Commmnt 2: TIGHT ON ~ST REPEAT AT ~4568', HOT SPOT CAUSED BY TOOL BEING Wmll Film Commmnt 3: POSITIONED AT ~3962' FOR TOO LONG, DDL~ SYSTEM USED TO LOG t:Jall File Co~m~nt 4: WEL. L. mm LIS tape written by: ANCHORAGE COMPUTING CENTER *:~ Al! curve and tool mnmmonic~ used arm t.~,.=.m -a~ which most. closmi,~ aatch ** Halliburton curve and tool mnemonics, ** :-P :~ :9 $ :~ :~:9 :~ :~ :9 :~ :~:~ :~:$: ~:~: :~:~; ~$ :~:9 ~::~ :9:~ :~:;~ ~;:~ ':~ :~ :9~: :~::~ :~:~ :$::4: :~:~ ;9:'~ :~:~: ~:~ :~:9 :~ :~ HALL, ISURTON TO SCHLUMBERGER TOP 80TTON MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH DEPTH DEPTH FT DEPT FT 9990,00 i4995.00 TENS G-EN LBS TENS GEN LBS 9990,50 1499~,50 SP OIL MV SP DIL MV 9990,50 ~4991.50 GR GEN APt GR GEN APl 9990,50 14991,50 ILD DIL OHMM ILO DIL OHMM 9990~50 ~499~,50 ILM DiL OHMM ILM DIL OHMM 9990,50 14991,50 RL, L,~ DIL OHMM RLL3 ~iL OHMM 9990.50 t4991.50 DT 8CS US?F DT 8C9 US/F 9990.50 i499i.50 FDSN DSN CPS FDSN DSN CPS 9990,50 1499i,50 NDSN DSN CPS NDSN DSN CPS 9990.50 14991.50 Pa9~ l'T2 TT3 TT4 NPH I NRAT CILD CIL. H BCS BCS BCS BCS DSN DSN DIL DiL US US US US SSPU MMHO MMHO TTi TT2 TT~ TT4 NPHI NRAT C!LD CILM 8CS 8CS 8CS 8CS DSN DSN DIL DtL US US US US SSPU MMHO MMHO 9990 9990 9990 9990 9990 9990 9990 9990 50 50 50 50 50 50 50 50 D A ~T A F 0 R M A ENTRY :+::*:~:~'- ENTRY BLOCK LEGEND TYPE DESCRI'PTiON 16 D.atum s~,mcification block sub.-typm 0 Terminat. or < no morm mntrims ) ' ' TYPE T~,c'PEC I F I CA T I ON'?~ SiZE CODE 16 t 66 0 i 66, DATA FORMAT · DATUM SPECIFICATION 8i_OCKS **** ':' '" C I' " '.'i · ~,PE. , F I L,A T 1 c SERVICE SERVICE MNEM iD ORDER $ API AP t API AP I F'IL.E UNIT LOG TYPE '.i .... PRC ~ SIZE LVL SNPL. RiD PROCESS INDICATORS DEPT 3?887.3 TENS GEN 3 ~ ~:_4 ,...~ SP D iL 378873 6R GEN ~78873 ILD D ii.. ~7887~ I LM D i L ~'78873 RL. L3 [:, t L. 378873 DT BCS 378873 F D S N D S N 378873 NDSN DSN ~7887~ TT i 8C'S g7887~ T T 2 8 C: S 3788 "~,.~ ~ TTJ 8 TT4 BCS '~ ~,.~, NPHi DSN 378873 NRAT DSN ~78':~,-~, CiLD D iL ~78873 CILM DiI_ .,~7887~ 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 O0000O OOOOO0000000 000000 000000 000000 000000 000000 000000 OOOOO0 O'OOO00 OOOOOO OOOO00 OOOOO0000000 000000 000000 000000 000000 000000 000000 000000 0'00000 000000 O000OO 000000 000000 000000 000000 000000 000000 000000 000000 000000 O0000'O 000000 000000 000000 000000 DEP T FDSN C~ LD TENS H L> ::, N C I LH SF' T T i DA TT2 TA RECORD"': ILl'., TT:$ I LH TT4 RLL.~ NPH i D T NRAT Page i 4'=~ i. O. i000. i 4900. 207, 295, 14700. 20!, 75. 14600, ,~ 0 i . 4500, 59. 44(}0. iii, i4300, ii7, 84, 14200, 51, -'-999, · _, .00 .0 O0 000 000 4.00 8 0 i '0 0 0 GO0 7i9 0 00 ?00 5.09 0 O0 700 162 000 800 704 000 800 000 800 i40 000 200 25O .x?19 000 O. 000 lO00.OOO 6080. 000 372,200 6096.000 874,000 134,276 382,400 i:0i.625 6~,,000 ...o~ 200 i'08, ~93 6546,000 308,500 75,683 261 ~00 i96,789 6329,000 262,300 119,950 6110,000 148,700 -999 o= 0.000 0.000 -82,300 326,000 ~"-t i 00 327,000 -26,600 .,~. O. O00 800 000 27,800 277,000 '35,800 3i1,000 30,000 ~:,4,000 -107,700 · ~ '~ '5 " 0.000 0,000 25. 000 ~;'.* ~_ .':_,, 000 9, ..sO 0 328,000 .~: 6.4 00 ..~... i 000 i 17,200 ,., i 9,000 327,400 264, :00 0 76,000 276,000 I. 000 O.O00 487,000 1 0,447 4:.~, 000 504,000 !~.305 492,000 I 6,74'9 404,000 477,000 399,000 .:,,. , . 000 t , 000 0.000 3.i48 487,000 7,447' 491. 000 9,840 50i . 000 493.000 'i3,2t :3 407,000 5. 082 4.7'8,000 4 ] '~ ~.,:., 000 .000 ='90 OhO I ,000 0,000 I i . i43 25.09 0 ;25,820 964 ~90 5,i88 -. .z, ,440 7,499 30,40'9 5;4.650 0.000 0.000 85. 900 i, '78 i 86,500 i ,805 ,:..~.000 84,300 i,853 75,300 i 83. 000 2,24,5 7~ 500 2,08S DP:PT TENS FDSN NDSN C i LD C i LH {4100.000 6047.000i 50,600 i74 ,,~.~00 g'~O 250 -999 0,00,000 60i ?. 000 ~q 400 i 999 , 250 ~ '~'': ' -~.~50 1,=~00 000 5874 000 55. 200 t66,200 ..... ~.~. 0 -999,250 .3700,000 580.3,000 59 .~00 i71,400 "999,250 -999. 250 :3600 , 000 5744,000 60. 500 i 62,300 -999,250 -999,250 135:00.000 5682,000 63,i00 i73,600 -~.250 -999,250 3400,000 56:04,000 66 , 200 g'~q 250 -. ..... i~300. 000 5o~8, 000 50. O00 t55,400 999. "...'50 -. --~.~, 250 DATA RECORDS SF' GR I LD I L.H RLL'Z O T TT i TT2 TT7 TI"4 NF'H i i',IRA T -62,800 ,~,'2. 000 --92, ..3' 00 27'.7, O00 · -,~,, ;-..', 00 277,0 O0 -87,200 27~ 000 -76,500 274,000 -69.4 O0 '"-3,,-: ," 000 -62,000 277,000 -65,900 276.000 ,.~ .... O0 27:4,000 4, t40 ':"87 000 63, O00 277,000 9, t4! · ., o :.', 000 70,000 ,~ ,-' ~, 0 '00 69, 280,000 ~91,000 61 , 5:0 0 o76 000 :055 ,000 67. ?:00 276,000 3,006 388,000 48,700 ~:4.~. 000 9,226 ~87,000 52,8,00 4. 064 388,000 68,5:00 246, 000 4,32'5 ~ OOO ,.000 389,000 ~0 690 '5 ,i, ,490 5; 6.30 0 .3. 195 ,000 .39i,000 29,992 46,690 59.000 ~ qO9 .000 ,.~0 000 30. 690 ' ~ o O0 56.900 -?;. i .,5 ,,'3 ,.'00'0 393,000 30,620 44,000 56,. 200 ,000 ~89,000 · '30.690 4i. i40 ,000 ~9i .000 ~0 690 39,380 57. 000 ,674 ,000 ..'3.,90. 000 .30,690 '" , ~o0 .000 ,39 O. 000 30..'339 ,.,...,960 56.800 .000 ,;, .w.~, 000 30.690 5O .890 62_..900 · ~ , 0,"3 OEP T FDSN C i LD 3200,0 O O 5-'"',~, 700 -999. 250 ~.3~ O0,00o 68,900 -999,250 i 3000. '.-0 O0 55.400 ~: ~ 00, '000 68.900 -999 '~'= , 12800,000 69.800 -~.,,250 i2700,'000 68,000 -999,250 12tS 00,0.00 5i ~00 -9.99,250 i2500.000 48,600 ,=;.4 0 O. 000 46,900 -999.250 TENS NDSN CiLM 5492.0 O0 "g'= ,25 ,-~.~ 0 54i4.000 i59.408 --999,250 5337,000 i74,600 o~5 OOO i72,200 -~99.250 ~,000 i67.i00 -999 '~=" o251,000 i4~,608 -999,250 5136,000 145,000 52t7,000 i6i,20~ -gqg '~= SP TTi -54.7'00 ,=:. ,' ...,. 000 -57.300 27S,000 -o~,400 272, O00 -72,400 ~,'~. 000 -65.400 .-, %-. ~ ~,' ..;., O00 -68,I00 °7'~ OOO -63,3O0 272,000 -48,900 ~¢~,000 -,900 27i. 000 D A T A RECORDS =R TT2 ILD TT3 ILH TT4 RLL3 NPH i 64,5'00 '276, O00 o.ii7 3'87,000 ,000 390. 000 .'30.620 4'.;"', 290 ~-8 600 243,0 O 0 .:, , 470 387,000 .OOO :>390, 000 690 i 90 5,3,200 '""" 000 4.775 387,000 ,000 09,000 30,761 4i.740 47. 400 24..3,000 6.5B,z'~ 388. 000 .'000 389.000 30,620 36,320 44,90 0 243,000 4,592 388. 000 , :000 390,000 30,690 3i q= 48,,000 244,0'00 6,442 :388,000 .OOO 390,000 ~0,549 ~ 0 275,000 3,750 ~87 000 .000 390.000 ..'~0,409 47,630 60, -300 276. O00 3,664 :387,000 .000 ,.-. :::':: OOO 47.660 61,i00 275,000 4,909 387, O00 , :00 '0 ....;, ,', O0 O 30 4,'.. 53, i80 DT NRAT 56.90O 56,800 2,743 65. OOO 2. 552 65,000 64,900 '--' 390 57,500 ~ '~ 56.700 2,966 60,200 3,i95 Page; DEPT F D S N C i L D 12,s v [ 000 49,500 -999,250 12200,800 46,800 -999, 2 I 2i OO, OOO 51 ,800 -999,250 1°000~ , 000 46,800 -999,250 53,i00 --.~. 250 11800,000 5i.800 -,999,250 11700,000 5i,200 -.999 ~= 11600,000 42,800 -999,250 11500.000 -999,250 DATA RECORDS TENS N D S N C i SP GR ILD I Ll'i RLLS TTi TT2 TT3 'TT4 NPHi DT NRAT 5224. 00 i5i '~' -999, 5155,000 5i82,000 i46,800 -999 5t30,000 i54,400 -~.250 51S1',80~ i55,600 -9'99,258 i44,300 4992. 000 i45,400 -999 '"'-'= 5.071,000 i35,800 -999,250 5021 o 000 I50,600 -999,250 -i3,900 ~.,' O. 000 -i 9. 200 ~,'o. 000 .-8, 27t, 000 -14,200 ,.,.i ,000 ~ '900 272, 0 O0 I ,500 z,, O,OOO 27' i , 0 O O 10,500 275,000 61 . 7 O 0 57. 000 '-'-' 78 000 63,700 242,000 6:'00 OOO 6,00 52,600 244,00 '0 52,800 242,000 45, ~;" tJ 0 2.75. O00 52...-400 ,=:79.000 5 . 984 ~84. O00 6. 486 :39 O, 000 586,000 3,I84 386,000 5., 508 ._'. :~ ~.,, 000 4.7i0 ~o~, 000 ~"" S, ... o,. 000 386. 000 3,289 390, 00'0 .'000 ,~88.000 . O00 ..'., c, t-¢. 000 ,000 389.000 .000 L':'.89,000 ,'000 ..~o,OOO . 000 x~'~ O0 d . 000 ._,c, 9,000 .000 392.000 30,269 4.'7,070 ~0,620 4.8 °00 '~ 99 ~7. 0 44,650 30,6'.90 52,660 30,690 47,ii0 30,690 600 30,690 4.5,620 SO ,620 54,260 30,479 39,460 ..6 600 2,955 56, .3 0 0 ~, 02i 64,900 o 863 62,600 3.i64 65,200 2.9,43 .'.:',, 1 O0 2,887 64. 'SO0 '"' '~06 56,900 3,'2'~ 55. 700 . .6~6 10 D E P T FDgN C i L f5 li4OO.OOO 44.i00 -999,250 tt;~O0.OOO ,.~OO 1~200,000 46.700 -999,250 iilO0,O00 49,300 -.999,250 1t000,000 45,30O -~,z50 I 0900,000 38.i00 '10800,000 5i,300 .... )99,250 t~O0 000 6i,800 -999,250 06.00. OOO 4i ,000 -999.250 RECORDS T E N S N D '"i' C i L M SP C~R i L.[:, I LM RL.L. 3 T T i T T2 T T ','!: T T 4 NPH Z DT NRAT 4970. O0 i48,70 -999.25 4,;,~ OOO i~7,600 -gq~ .~.2~0o 483t,000 i43.000 .-999 4608,000 i44,000 4738,000 i 37.30'0 ~,250 4, e3,000 i40.OOO -999 4683.000 I49,30'0 -999,250 4594,00~ i53.300 -999,258 4576,000 -999.250 i i , 4' O0 27 i . 000 6,700 .'..~ 7 i . 000 i 0.4, O 0 271,000 7 ~00 ':2;:"'2. 000 9,900 2,.'"'0. OOO 6,800 ':' ~'-'" 000 i0,800 27i, 000 , ..,00 270,000 t0,400 27.3,000 57.700 24i,000 ~ 600 243.000 ,.',~, 800 24.3,000 65,700 243,000 58,50'0 24i,000 59,100 46.100 242,000 46,400 24. i,000 ~'~ 700 ~,5,0OO 999 000 .~o~.000 3,:.~., 00 O ~,~ 204 S,95. O00 ~85 000 6, 194 ,,~. ~, 000 t O. 28, O S;-]5, 000 7,709 385,000 5. 035 395,000 .000 o8.'000 , 000 '~o~ 000 .000 388,000 ,0'00 3~ 000 ,000 387,000 . '000 · 389,000 .000 ~o-~ 00 O ,000 ZST,000 ,000 392.000 30,620 48,720 .30.69:0 53.560 30,620 49,590 ~0 ~00 47,500 ~0 6~0 54,-R 30.690 48.470 30,690 3~-~, 550 30, 061 52,330 64,300 3,055 64.900 3, 65. 000 .7, 04° 65,000 ~ 0~'~ 64,900 996 64,800 3,263 62.300 3,0i7 64,900 2.666 6i ,600 .3, i52 il DEPT FD~-..H C I LD TENS NDSN C: l L bi SP TT~ DA GR TT2 TA RECORDS ILO TT ,7 i LH T T 4 RLL.~ N P H i DT NRAT 10500,'000 45,900 '0 400: 000 40.500 -999.250 I0300,000 4i,800 -999.250 I0200,'000 :37,800 -q9q ~ O1 00. 000 44., 5 O0 -999,250 I 0000: 000 4583 i45 -999 4555 -,: ~: 4354, I44. 4396, t4i, -999. ,000 ,2O0 ,250 , O00 .700 ,250 ,000 ,000 000 OOO 250 .00 O 5O0 250 000 600 25O '2,40 '0 27' i , 000 I 0,600 '27't . O00 27i ,000 4, i O0 27 O, 000 i2,000 270,000 7,500 ~.,'i ,000 40,200 242,000 63,8O0 275.000 1.06,700 2.79,000 i17,6'00 242,000 96,9-00 242,000 }~1,4.00 243 000 5,058 .~o,OOO :~ 204 :384. 000 7,, 06~ ,., o o. 000 ._~ :385, O 00 ~86,00 O 6,9!8 :395,000 , 00:0 ..~ c. ~, :000 , OOO · -; o ,,., OOO ,000 388,000 ,000 :387,000 . O0 0 38 9,0 0 0 ,000 ,.~o.000 ~0 690 46,450 50,090 5i -".:' i 0 30,62'0 6i °00 30,690 52,530 5 i, 96 0 65. 00.0 2 .,952 · _b 400 ..,.~ .z,, 074 64. 90n ~,i29 64,700 3,439 66,70'0 3,i70 64.700 ,z,. i 3b Film name; &GSFO1 .00~ TRA I LER RECORDS Max:imux~ length: !024 File: tpp¢: LO Ver~ion ~: Dmtm: Next f'i Page Service name; &.C;SFOi Nmxt r-me:l: Date: 90/0._,,22 Cosmmnts: Origin: Re. el name; ,~,.o8,.¢ Continuatior'~ ~; O~ Origin: Tape nam,i: g ,' ~,~ ," .., L:ont. inu.~.tion ~; Oi