Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-020 STATE OF ALASKA A KA OIL AND GAS CONSERVATION COM SION • REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations El Fracture Stimulate El Pull Tubing❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate El Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well El Re-enter Susp Well❑ Other: Cl 2.Operator 4.Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development 0 Exploratory 0 190-020 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99503 50-733-20137-01 C E iv n la 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0018756 MGS C12-23 MAY 0 3 211, 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Middle Ground Shoal/E,F and G Oil Pools f 11. Present Well Condition Summary: Total Depth measured 11,895 feet Plugs measured N/A feet true vertical 9,585 feet Junk measured N/A feet Effective Depth measured 11,686 feet Packer measured 10,897 feet true vertical 9,721 feet true vertical 9,246 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,389' 13-3/8" 1,389' 1,383' 2,730 psi 1,130 psi Intermediate Production 9,866' 9-5/8" 9,866' 8,422' 6,330 psi 3,810 psi Liner 2,356' 7" 11,737' 9,754' 7,240 psi 5,410 psi Perforation depth Measured depth 10,984-11,668 feet AME© JUN 2 `i 40 i=. True Vertical depth 9,301 -9,709 feet Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.5#/L-80 10,947(MD) 9,279(TVD) 10,897(MD) 300(MD) Packers and SSSV(type,measured and true vertical depth) Baker"HB"Packer 9,246(TVD) Otis SSSV 300(TVD) 12.Stimulation or cement squeeze summary: Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 51 6 17 481 73 Subsequent to operation: 78 12 17 510 74 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory❑ Development El Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil El Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 316-111 Contact Dan Marlowe(907)283-1329 Email dmarlowe(c�hilcorp.com Printed Name Stan W.Golis Title Operations Manager Signature bL. Cs✓/�^ Phone (907)777-8356 Date 5/$ , i t /,_ 5--7-/t' ie 1$" Form 10-404 Revised 5/2015 Submit Original Only RBDMS IA- MAY 0 4 2016 g • III Middle Ground Shoal Well: MGS C12-23 SCHEMATIC Last Completed: 6/19/1990 PTD: 190-020 Hilcorp Alaska,LLC API: 50-733-20137-01 KB:35' Water Depth: 73'MSL CASING DETAIL Size Wt Grade Conn ID Top Btm Cement J 1 13-3/8" 54.5 K-55 BTC 12.615" 39.70' 1,389' 200 sx 43.5 L-80 LTC 8.755" 37.70' 4,018' 9-5/8" 47 L-80 LTC 8.681" 4,018' 9,866' 360 sx b 26 L-80 LTC 6.276" 9,381' 10,457' 7 32 P-110 LTC 6.094" 10,457' 11,737' 771 sx TUBING DETAIL 13-3/8" 2-7/8" 6.5 L-80 8rd EUE 2.441" Surf 10,947' 0 JEWELRY DETAIL Depth Depth No (MD) (TVD) ID Item 1 300' 300' Otis SSSV 1,784' 1,770' GLM#1 3,342' 3,146' GLM#2 4,868' 4,318' GLM#3 6,235' 5,321' GLM#4 %, 0 2 7,317' 6,144' GLM#5 ' 2 8,118' 6,780' GLM#6 8,667' 7,278' GLM#7 e� 0 9,215' 7,801' GLM#8 9,733' 8,298' GLM#9 0 10,283' 8,792' GLM#10 10,801' 9,185' GLM#11(Orifice) 3 10,846' 9,214' Otis"XD"Sliding Sleeve ' 0 4 10,897' 9,246' Baker"HB"Packer w/seal assy&PBR(Seal Assy @ 10,882',PBR @10,882') ti 5 10,935' 9,272' 2.205" Otis"XN"Nipple 6 10,947' 9,278' Otis WL Re-entry Guide 9-5/8" ' • ; PERFORATION DETAIL 0 Top Btm Top Btm DOB 3 . Zone (MD) (MD) (TVD) (TVD) FT Date Status HK-1 10,984' 11,010' 9,301' 9,317' 26' Open ® ` 4 HK-1 10,990' 11,010' 9,306' 9,318' 20' 04/06/16 Open _XN_ 6 HK-1 11,078' 11,120' 9,357' 9,381' 42' Open L____3 HK-1 11,080' 11,100 9,359' 9,370' 20' 04/06/16 Open 6 HK-1/HK-2 11,190' 11,236' 9,421' 9,447' 46' Open HK-2 11,230 11,250 9,444 9,455' 20' 04/06/16 Open HK-2 11,280' 11,358' 9,472' 9,517' 78' Open HK-2 11,330' 11,360' 9,501' 9,518' 30' 04/05/16 Open HK-2 11,398' 11,412' 9,540' 9,548' 14' Open i , -+ ' - HK-2 11,400' 11,450' 9,541' 9,571' 50' 04/05/16 Open , HK-2 11,416' 11,510' 9,550' 9,607' 94' Open HK-2 11,480' 11,510' 9,589' 9,608' 30' 04/04/16 Open Fill 11,686' r (7/28/01) ,` HK-3 11,564' 11,668' 9,641' 9,709' 104' Open 1 PBTD=11,711' TD=11,895' Updated By:JLL 04/29/16 • • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MGS C12-23 E-Line 50-733-20137-01-00 190-020 4/4/16 4/6/16 Daily Operations: 04/04/2016-Monday Fly SLB crew OSK to C platform. Platform orientation.SLB crew safety meeting with production operators&crane operator.JSA&Permit to Work.Spot SLB E-line equipment package on production deck.SI gas lift and allow well to flow to separator. Rig up lubricator&BOP stack to WH. Pressure test WHA and Lubricator/BOP assembly 250 LO/3500 HI-PASS. Initial Pressures(psi)-Tubing=50, IA=424,OA=64. PU GR/CCL log suite.Verify wire, BHA and firing head conductivity. Function test CCL.Arm Steel Carrier Gun#1(30'X 1.75"OD,GeoDynamics Razor,6 spf,60 deg. phase). 6.60'source to top perf shot. Rig to WHA.Open Swab. RIH to 11,600'WLM. 2-7/8"tbg,6.5 ppf,0'-10,947',7"CSG, 26 ppf, 10,457'-11,737'. Log up to 11,028'. Correlate and tie back to OH GR log and tie back correlation log. RIH to 11,600'. Repeat log and email LAS file and tie back log for correlation verification.Correlation verified. RIH to 11,600'. Log up to to 11,473.4'(+6.60'source to top perf)to put shots on depth. Perforate with Top Perf=11,480'and Bottom Perf=11,510'(1.75"OD GeoDynamics Razor,6spf,60 deg phase). Pre-Perforation Tubing pressure=50 psi. Post- Perforation Tubing pressure=50 psi. POOH to surface. Close swab valve. Perf gun at surface with all shots fired. L/D lubricator and tool suite. Nite cap BOP stack.Secure well and well room.Shut Down for Nite.Ongoing Operations. Final T/IA/OA=50/423/65. 04/05/2016-Tuesday Safety Meeting, Permit to Work and JSA. Initial Tubing=50 psi, IA=420 psi,OA=65 psi. Rig up ELU. PU GR/CCL tool suite.Arm Gun#2(33'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase).3.30'GR source to top perf. Rig to WHA. Pressure Test=250 LO/3500 HI-PASS.Open Swab and RIH. RIH to 11,611'WLM. Log up to correlate depth to OH GR log.Apply 35.3'shift to log and trip in hole to 11,611'. Log again to verify correlation correction.Send LAS file for depth verification and log depths verified. Log up from 11,611'and stop at GR source depth=11,413.7'(+3.30'source to top perf). Perforate placing Top Perf= 11,417 and Bottom Perf=11,450'(33'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase.Tubing=50 psi, IA=420 psi,OA=65 psi. POOH to surface.Close swab. L/D Gun#2, all shots fired. PU Gun#3 (17'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase). 6.60'GR source to top perf. Rig to WH.Open swab and RIH. Tubing=100 psi, IA=420 psi,OA=65 psi. RIH to 11,602'WLM. Log up to correlate depth.Apply 18.5'shift and repeat log to verify depth correlation to OH GR log. Return to 11,600'and log up to 11,393.4'(+6.60'source to top perf). Perforate placing Top Perf= 11,400 and Bottom Perf=11,417'(17'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase). Tubing=100 psi, IA=420 psi,OA=65 psi. POOH to surface.Close swab. LID Gun#3,all shots fired. PU Gun#4(30'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase). 6.60'GR source to top perf. Rig to WH.Open swab and RIH.Tubing=100 psi, IA=420 psi,OA=65 psi. RIH to 11,510'WLM. Log up to correlate depth.Apply 18.0'shift and repeat log to verify depth correlation to OH GR log. Return to 11,510'and log up to 11,323.4'(+6.60'source to top perf). Perforate placing Top Perf=11,330 and Bottom Perf=11,360'(30'X 1.75"OD GeoDynamics Razor,6spf,60 deg phase). POOH to surface. Close swab valve. Perf Gun #4 at surface with all shots fired. L/D lubricator and tool suite. Nite cap BOP stack.Secure well and well room.Shut Down for Nite. Return well to Production.Ongoing Operations. Final T/IA/OA=00/420/65 psi. • • ati Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MGS C12-23 E-Line 50-733-20137-01-00 190-020 4/4/16 4/6/16 Daily Operations; 04/06/2016-Wednesday Safety Meeting, Permit to Work and JSA.Well Flowing-Initial T/IA/OA=75/500/66 psi. Rig up ELU. PU GR/CCL tool suite.Arm Gun#5(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).3.70'GR source to top perf. Rig to WHA. Pressure Test=2000 psi-PASS.Open Swab and RIH. RIH to 11,450'WLM. Log up to 11,270'to correlate depth to OH GR and tie back logs.Apply 22.0'shift to log and RIH to 11,450'and repeat log to verify correction.TIH to 11,450'again and log up stopping at 11,226.3'(+3.70'source space out)placing shots on depth. Perforate Top Perf= 11,230'and Bottom Perf= 11,250'(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).T/IA/OA=74/500/66 psi. Pooh to surface.Close swab valve. L/D Gun#5,shots fired. PU Gun#6(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).3.30'GR source to top perf. Rig to WH.Open swab and RIH.T/IA/OA=75/487/65 psi. RIH to 11,308'WLM. Log up to 10,900'to correlate depth to OH GR and tie back logs.Apply 13.0'shift to log and RIH to 11,300'and repeat log to verify correction.TIH to 11,250'and log up stopping at 11,076.7'(+3.30'source space out)placing shots on depth. Perforate Top Perf=11,080'and Bottom Perf=11,100'(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).T/IA/OA=69/492/66 psi. Pooh to surface.Close swab valve. L/D Gun#6,shots fired. PU Gun#7(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).3.70'GR source to top perf. Rig to WH. Open swab and RIH.T/IA/OA=69/485/65 psi. RIH to 11,100'WLM. Log up to 10,900'to correlate depth to OH GR and tie back logs.Apply 17.0'shift to log and RIH to 11,150'and repeat log to verify correction.TIH to 11,150'and log up stopping at 10,986.3'(+3.70'source space out) placing shots on depth. Perforate Top Perf= 10,990' and Bottom Perf= 11,010'(20'X 1.75"OD GeoDynamics,6spf,60 deg. phase).T/IA/OA=69/491/65 psi. Pooh to surface.Close swab valve. Break for meal and Safety Meeting/JSA with Change-Out Crane Operator. Final T/IA/OA= 69/491/65 psi. Rig lubricator assembly off BOP/WHA stack. L/D Gun#7,shots fired. Rig BOP stack off WH and install WH Cap.Turn well over to Production.Job Complete and Ended. - 0 `al'0e"402-0 Vor T,, gi,-. �y��-c,. THE STATE Alaska Oil and Gas tioi of Conservation Commission ALAS <:A .ft �� 333 West Seventh Avenue ' ' C GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 .:r;* Main: 907.279.1433 U4,,A' "e*P' Fax: 907.276.7542 www.aogcc.alaska.gov Stan Golis Operations Manager ��rn I:cru t:2 2 01[-, Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Middle Ground Shoal Field, E, F, and G Oil Pools, MGS C 12-23 Permit to Drill Number: 190-020 Sundry Number: 316-111 Dear Mr. Golis: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /°q-(,v25L-t Cathy P Foerster Chair DATED this /*ay y of February, 2016. RBDMS Lt- FEB 1 1 2016 • • RECEIVED STATE OF ALASKA FEB 0 8 2016 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCr 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown Suspend ❑ Perforate 0 Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. ❑ 2.Operator Name: 4.Current Well Class: 5. Permit to Drill Number Hilcorp Alaska, LLC Exploratory ❑ Development 0. 190-020- 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number Anchorage,AK 99503 50-733-20137-01 . 7. If perforating: '8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? CO 44 Will planned perforations require a spacing exception? Yes ❑ No 0 MGS C12-23 • 9. Property Designation(Lease Number): 10.Field/Pool(s): ADL0018756• Middle Ground Shoal/E, F and G Oil Pools . 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11,895 . 9,585 ' 11,686 ' 9,721 3,720 psi N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,389' 13-3/8" 1,389' 1,383' 2,730 psi 1,130 psi Intermediate Production 9,866' 9-5/8" 9,866' 8,422' 6,330 psi 3,810 psi Liner 2,356' 7" 11,737' 9,754' 7,240 psi 5,410 psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10,984-11,668 - 9,301-9,709 2-7/8" 6.5#/L-80 10,947 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): Baker"HB"Packer&Otis SSSV - 10,897'(MD)9,246'(TVD)&300'(MD)300'(TVD) 12.Attachments: Proposal Summary 0 Wellbore schematic 0 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 • Service ❑ 14. Estimated Date for 15.Well Status after proposed work: Commencing Operations: 2/22/2016 OIL 0 . WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Dan Marlowe(907)283-1329 Email dmarlowe@hilcorp.com Printed Name �I Stan- W.Golis Title Operations Manager �� Jt' � Signature . " Phone (907)777-8356 Date Z ($' 1 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ' ‘(-Q - \\\ Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ^❑/ f1 Spacing Exception Required? Yes ❑ L�No Subsequent Form Required: 16-404 RBDMS L L FEB 1 1 2016 APPROVED BY / Approved by: -�a47p, „(���� COMMISSIONER THE COMMISSION Date: 2-/C - /6 �"`� /i L Iib �/ �``�� /r M'$'Q Z 10 GligeG311111N,Atd Submit n Form and Form 10-403 Revised 11/2015 for 12 months from the date of approval. Attachments in Duplicate • • Well Prognosis Well: MGS C12-23 Hilcorp Alaska,LLC Date: 01/28/2016 Well Name: MGS C12-23 API Number: 50-733-20137-01 Current Status: Gas-Lifted producer Leg: Leg#4 South corner Estimated Start Date: February 22, 2016 Rig: N/A (E-Line) Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: Regulatory Contact: Juanita Lovett (8332) Permit to Drill Number: 190-020 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907) 398-9904 (M) Second Call Engineer: Trudi Hallett (907) 777-8323 (0) (907) 301-6657 (M) Current Bottom Hole Pressure: 3,595 psi @ 8,000'TVD 0.449 psi/ft datum 2016 PBU Maximum Expected BHP: 4,000 psi @ 8,000'TVD 0.500 psi/ft datum upper zone/offsets Maximum Potential Surface Pressure: 3,720 psi Using 0.1 psi/ft gradient 20 MC 25.280(b)(4) Brief Well Summary Well Middle Ground Shoal C12-23 is a gas-lifted oil well completed in the Hemlock zone.This project will c re for�yto he Hemlock sands. n F J pGrVok tvi .b E-line Procedure: 1. MIRU E-line, PT lubricator to 5,000 psi Hi 250 Low. ✓ 2. RU e-line guns and perforate per program. Record tubing pressures before and after perforating run. 3. RD E-line. 4. Turn well over to production. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic H . 0 Middle Ground Shoal Well: MGS C12-23 SCHEMATIC Last Completed:06/19/1990 PTD: 190-020 1[ilcor»Alaska.LLC API: 50-733-20137-01 KB:35' Water Depth: 73'MSL CASING DETAIL Size Wt Grade Conn ID Top Btm Cement 13-3/8" 54.5 K-55 BTC 12.615" 39.70' 1,389' 200 sx 43.5 L-80 LTC 8.755" 37.70' 4,018' 9-5/8" 47 _ L-80 LTC 8.681" 4,018' 9,866' 360 sx 26 L-80 LTC 6.276" 9,381' 10,457' -� 7 32 P-110 LTC 6.094" 10,457' 11,737' 771 sx TUBING DETAIL 2-7/8" 6.5 L-80 8rd EUE 2.441" Surf 10,947' 13-3/8" 0 m JEWELRY DETAIL 6 Depth Depth No (MD) (TVD) ID Item 1 300' 300' Otis SSSV 1,784' . 1,770' GLM#1 3,342' 3,146' GLM#2 4,868' 4,318' GLM#3 2 6,235' 5,321' GLM#4 7,317' 6,144' GLM#5 2 8,118' 6,780' GLM#6 0 8,667' 7,278' GLM#7 9,215' 7,801' GLM#8 0 9,733' 8,298' GLM#9 10,283' 8,792' GLM#10 10,801' 9,185' GLM#11(Orifice) 6 3 10,846' 9,214' Otis"XD"Sliding Sleeve 4 10,897' 9,246' Baker"HB"Packer w/seal assy&PBR(Seal Assy - @ 10,882',PBR @10,882') 5 10,935' 9,272' 2.205" Otis"XN"Nipple 9-5/8" ' 6 10,947' 9,278' Otis WL Re-entry Guide • B OHS, 3 PERFORATION DETAIL Top Btm Top Btm 4 Zone (MD) (MD) (TVD) (TVD) FT Date Status HC-HD 10,984' 11,010' 9,301' 9,317' 26' Open _XN_ 5 'w' HE-HF 11,078' 11,120' 9,357' 9,381' 42' Open ifi 6 HI-HK 11,190' 11,236' 9,421' 9,447' 46' Open * HK-HN 11,280' 11,358' 9,472' 9,517' 78' Open j' ; HN-HR 11,398' 11,412' 9,540' 9,548' 14' Open HN-HR 11,416' 11,510' 9,550' 9,607' 94' Open - HR-HZ 11,564' 11,668' 9,641' 9,709' 104' Open i' 5 a w y. Fill 11,686' 7' (7/28/01) 1 '. PBTD=11,711' TD=11,895' Updated By:JLL 02/04/16 1111 Middle Ground Shoal Ei 1111 Well: MGS C12-23 PROPOSED Last Completed: 6/19/1990 PTD: 190-020 (Iilcorp Alaska,LLC API: 50-733-20137-01 KB:35' Water Depth: 73'MSL CASING DETAIL rail T Size Wt Grade Conn ID Top Btm Cement �' 13-3/8" 54.5 K-55 BTC 12.615" 39.70' 1,389' 200 sx 43.5 L-80 LTC 8.755" 37.70' 4,018' 9-5/8" 47 L-80 LTC 8.681" 4,018' 9,866' 360 sx )i 26 L-80 LTC 6.276" 9,381' 10,457' 7 32 P-110 LTC 6.094" 10,457' 11,737' 771 sx TUBING DETAIL 13-3/8" 2-7/8" 6.5 L-80 8rd EUE 2.441" Surf 10,947' 0 JEWELRY DETAIL Depth Depth No ID Item (MD) (TVD) 1 300' 300' Otis SSSV 1,784' 1,770' GLM#1 0 3,342' 3,146' GLM#2 4,868' 4,318' GLM#3 6,235' 5,321' GLM#4 2 ip 1: 7,317' 6,144' GLM#5 2 8,118' 6,780' GLM#6 8,667' 7,278' GLM#7 0 9,215' 7,801' GLM#8 9,733' 8,298' GLM#9 0 10,283' 8,792' GLM#10 10,801' 9,185' GLM#11(Orifice) 3 10,846' 9,214' Otis"XD"Sliding Sleeve 0 4 10,897' 9,246' Baker"HB"Packer w/seal assy&PBR(Seal Assy @ 10,882',PBR @10,882') 0 5 10,935' 9,272' 2.205" Otis"XN"Nipple 6 10,947' 9,278' Otis WL Re-entry Guide 9-5/8" ' • b PERFORATION DETAIL Top Btm Top Btm 000 3 Zone FT Date Status (MD) (MD) (TVD) (ND) HC-HD 10,984' 11,010' 9,301' 9,317' 26' Open 4p. 4 1' HK-1 ±10,990' ±11,010' ±9,306' ±9,318' ±20' Proposed M; ,' HE-HF 11,078' 11,120' 9,357' 9,381' 42' Open • 5 • f-'.!; } 'i HK-1 ±11,080' ±11,100 ±9,359' ±9,370' ±20' Proposed s. 6 w $., HI-HK 11,190' 11,236' 9,421' 9,447' 46' Open VHK-2 ±11,230 ±11,250 ±9,444 ±9,455' ±20' Proposed # HK-HN 11,280' 11,358' 9,472' 9,517' 78' Open k HK-2 ±11,330' ±11,360' ±9,501' ±9,518' ±30' Proposed '" AP HN-HR 11,398' 11,412' 9,540' 9,548' 14' Open HK-2 ±11,400' ±11,450' ±9,541' ±9,571' ±50' Proposed * 1 . HN-HR 11,416' 11,510' 9,550' 9,607' 94' Open P.'' v* ' HK-2 ±11,480' ±11,510' ±9,589' ±9,608' ±30' Proposed Fill 11,686 y " (7/28/01) '^ HR-HZ 11,564' 11,668' 9,641' 9,709' 104' Open PBTD=11,711' TD=11,895' Updated By:.111 02/04/16 XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. Iq O&O File Number of Well History File PAGES TO DELETE RESCAN [] Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original ~ Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other Complete COMMENTS: Scanned by: ~ Bran Vincent Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Beverly Bren Vincent Nathan Lowell Date: Is~ NOTScanned.wpd Safety Valve & Well Pressures Test Report lievrewed By: ~ J P.I. Suprv f'' Z ~ 1G Comm Pad: MGS_X'f0_C_PLATF InspDt: 2/22/2008 °~Inspected by John Crisp Interval InspNo svsJCr080225134306 Relu[ed Insp: Field Name MIDDLE GROUND SHOAL Operator XTO ENERGY INC Operator Rep Barney Phillips Reason 90-Day "~ Src: Inspector Well Data _ __ _ - Pilots- '~ SSV _SSSV tShutln Dtl Well Type j Well Pressures 1 Gas Lift ~ Conrrnents ' Waiver ' Well Permit Separ . _ Set L/P Test Test Pest Date SI Oi1,WAG,GINJ, Inner Outer Tubing Number Number PSI PSI Trip Code Code Code GAS,CYCLE, S! I'S] PSl PSI Yes/No Yes/No ~ ' r r C12 23 1900200 ~ 68 37 37 T P P P 1-OIL --i - -_ _ _ - C13-23 1880990 68 37 37 ~ P P P 1-OIL - -- - --.. C13A-23 ~ 1901060 68 0 ~ P P 1-OIL 021-23 ~ 1890870 _ 021-26 1890040 68 68 ~ 0 ~ - 0 _ P __ P _ - -- 1-OIL _ - - - - - - -- - - --- - - - - t ---- _._ ______ I ii SSSV out for W/L work - I _ _ "i / C21A 23 ~ 1910440 ~ ~ 68 ~ ~ 0 i -Y P P _ t 1-OIL 1-UIL -- -- _ - _ -- - -~ l - _ _ __ 022 26RD i 1760650 68 0 ~ P P 1-OIL C22A-26LN j i - ---- 2041820 -- _ 68 - 0 - ~ P P t-0IL - _ _- ' C3126RD __ - 2041400 ---- 68 0 - -- P -- P -- - _ - -- . I-OIL -_ . . - --. -. _ ~ 1 ' 032 23LW 2020340 68 I 0 P, 1' - - 1-OlL __ - _--- - -- - - -- --.. _ _ _ - -_ _ __~ -- -- 042-23 043-14 --___- 1780240 1881320 _- ___ 68 ~ 68 _ .--- _ 0 0 -- -- - __ --- P P -1 P P _ -- - 1-OIL 1 OU - --- _ - ~ _ -- - --I _ __ -1 _~ __ - Comments Performance Pilol numbers listed on wells 01 2-23 & 01 3-23 are for the pilots on the separators. Individual wells are 1 not equiped with pilots on this platform. :/ Wells Components Failures Failure Rate `- 12 25 0 c: ,~h1N~~ MAR ~. 9 2008 Tuesday, February 26, 2008 I THE MATE~AL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 20.00 E PL E W M A T E R IA L U N D ER TH IS M ARK ER C:LORI~IFILM.DOC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend __ Operation shutdown__ Re-enter suspended well ~ After casing __ Repair well __ Plugging Time extension __ Stimulate__ Change approved program __ Pull tubing ~ Variance ~ Perforate __ Other X 2. Name of Operator Cross Timbers 0peratinq Company 3. Address 210 PARK AVE. SUITE 2350 OKLA. CITY, OK. 4. Location of well at surface Platform "C", Leg 4, Cond. 26 At top of productive interval 2830 N & 2554' W of surface location At effective depth At total depth 2833' N & 1826' W of surface location 73102 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 105' KB 7. Unit or Property name Middle Ground Shoal 8. Well number C12-23 9. Permit number 90-20 10, APl number 5o- 733-20137-00 11. Field/Pool HGS/ E,F & G Pool feet 12. Present well condition summary Total depth: measured true vertical 11,895' feet Plugs (measured) 9858' feet Effective depth: measured 11,711' true vertical 9737' feet Junk (measured) feet Casing Length Size Structural Conductor Surface 1,389' Intermediate9866 ' Production Liner 11,737' Perforation depth: measured 10,894'- 11,668' true vertical Cemented 13-3/8",54.5~,K-55 200 sx "G" 9-5/8",43-47#,L-80 360 sx "G" 7",26-32#,L-80, 771 sx "G" 9,301'-9,709' Tubing (size, grade, and measured depth) 2.7/8", 6.5~, L-80 AB-HOD EUE to 10,897' Packersand SSSV~typeand measureddepth) BAKER Packer @ 10,897' ORIGINAL Measured depth 0'-1,389' 0'-9866' 9381'-11,737' True vertical depth 0'-1,389' 0'-9866' 9,381'-11,737' RECEIVED APR 0 4 2000 Alaska Oil & Gas Cons. Commission Anchorage 13. Attachments Description summary of proposal Detailed operations program X BOP sketch 14. Estimated date for commencing operation 05/01/2000 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Service INJECTOR Suspended 17. I ~cfrt~.,~ t~~O~ and correct to the best of my knowledge. Signe(J~/~ Title Sr. Engineering Tech Date 04/03/2000 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- IApproval No.~ ,,,, Approved by order of the Commission ORIGINAL SIGNED. BY Robert N. Chn.'stenson Form 10-403 Rev O6/15/88 Commissioner SUBMIT IN TRIPLICATE CROSS TIMBERS OPERATING COMPANY MGS C12-23 COOK INLET, ALASKA WELL DATA SURFACE CASING: PRODUCTION CASING: LINER: TUBING: PERFORATIONS: OBJECTIVE: 13 3/8" 54.5# K55. Set ~ 1389'. Cmt w/200 sx. 9 5/8" 43.5, 47# L80. Set at 9866'. Cmt w/360 sx. 7" 26, 32 # LB0, P110. TOL ~ 9381'. Set ~ 11737'. 2 7/8" 6.5# LB0 ABMOD EUE ~ 10897'. HC-HD 10984-11010' HE-HF 11078-11120' HI-HK 11190-11236' HK-HN 11280-11358' HN-HR 11398-11412', 11416-11510' HR-HZ 11564-11668' Convert To Injection Cmt w/9990 sx. Note: This well will no flow. If well control is needed, FIW will control this well. Have mud and weight material on location during workover operations. H2S on 3/30/2000 was 0 ppm. 1. RU SL. Test lubricator. Pull ball valve and GLV #11. Run and set a plug in XN nipple ~ 10935'. RD SL. Skid rig and RU. Load well w/FIW. Install BPV. ND tree and NU BOP's. Test BOP's. Release Bkr (BOT) HB pkr and POOH w/2 7/8" 6.5# LB0 8R EUE ABMOD tbg and pkr assembly. LD and send to shore for inspection. Check all tbg for NORM per OIL 1.00(n)-I (Revised 1/10/92). PU 3 ½" DP. TIH w/6" bit and scraper for 7" 32# csg, 3 ½" DP, scraper for 9 5/8" 47//csg on 3 ½" DP. Space out to run 7" scraper to 11160' and 9 5/8" scraper to TOL ~ 9381 '. Pump a 40 bbl Xanvis pill to clean well. Circ well clean. If necessary, pump a second pill. Circ well clean using FIW. POOH. 4. TIH w/7" sqz pkr on 3 ½" DP to +10900'. Test annulus to 2000 psi. Release pkr and POOH. 5. RU Schlumberger w/5000 psi lubricator. Test lubricator. Re-Perfthe Hemlock as follows: HC HE 10984-11010' EL (10980-11006' Atlas SBL) (26') 4 SPF, 104 holes, 90° phased 11078-120' EL (11074-116' Atlas SBL) (42') 4 SPF, 168 holes, 90° phased using a 4 ½" HSD (Schlumberger 5lB 38.8g charge, .46" EHD, 34.6"TTP). RD Schlumberger. (Cased hole log--Atlas Segmented Bond Log, 5/17/90) 6. RU Schlumberger WL w/5000 psi lubricator. Test lubricator. Run and set a Baker DB pkr assembly as follows: Item Length Top Btm Baker DB pkr 13 11140 11153 6' pupjt 2 7/8" 7.9# N80 BTS6-PR 6 11153 11159 Otis RN nipple 2.010" ID 1 11159 11160 6' pup jt 2 7/8" 7.9# N80 BTS6-PR 6 11160 11166 RECEIVED APR 0 4 2000 Oil & Gas Cons. Commission Anchorage CROSS TIMBERS OPr--'ATING COMPANY MGS C12-23 COOK INLET, ALASKA CONVERT TO INJECTION IWL Re-entry Guide Set pkr assembly ~ +11140'. POOH. RD Schlumberger. 7. TIH w/top pkr assembly as follows: Item Length Top Btm 2 7/8" 7.9# N80 BTS6-PR 300 0 300 Otis R nipple 2.188" ID 1 300 301 2 7/8" 7.9# N80 BTS6-PR 10532 301 10833 Bkr SB3 pkr 3 10833 10836 1 jt 2 7/8" 7.9# N80 BTS6-PR 32 10836 10868 Otis R nipple 2.188" ID 1 10868 10869 1 jt 2 7/8" 7.9# N80 BTS6-PR 32 10869 10901 Otis R nipple 2.188" ID 1 10901 10902 3 its 2 7/8" 7.9# N80 BTS6-PR 96 10902 10998 GL Mandrel w/dummy valve 6 10998 11004 2 its 2 7/8" 7.9# N80 BTS6-PR 64 11004 '11068 GL Mandrel w/Inj Control Valve set @ 6 11068 11074 !900 BWPD 5jts 2 7/8" 7.9# N80 BTS6-PR 64 11074i 11138 Seal Unit 2 11138 11140 Locate btm pkr ~ +11140'. Attempt to reverse circ to insure lwr seals are in btm pkr. PU and pickle tbg using 500 gal ofxylene and 500 gal of 15% HC1. Displace acid and xylene to EOT and reverse out. Spot pla' fluid using 10 gal of Nalco ECl 124A per 100 bbls. Lwr pkr assembly. Drop Halliburton setting ball. Press up to set pkr per Baker recommendation. Land tbg. Test annulus to 2000 psi. ND BOP's, NU tree. Test tree to 5000 psi. Cap blf Top Btm Bbls 9 5/8"43.5# x 2 7/8" annulus 0.0664 0 4018 267 9 5/8"47# x 2 7/8" annulus 0.0652 4018 9381 350 7" 29# x 2 7/8" annulus 0.0291 9381 10457 31 7" 32#x2 7/8" annulus 0.028 10457 11140, 19 Total Annular Fluid to top of Pkr 667 8. Notify the State 48 hrs prior to MIT and start of injection. Target injection rate is 1000 BWPD. Max press is 5496 psi (80% of burst for 9 5/8" 47//NS0 csg). Any oil should be sent to shore. Dispose of all other returned fluids to the disposal well. Document all uses of the disposal well per the attached schedule. RECEIVED APR 04 2000 Alaska Oil & Gas Cms. Commission Anchorage cross TIMBERS OPI?~'iTING COMPANY MGS C12-23 COOK INLET, ALASKA CONVERT TO INJECTION 03/31/00 Charles Po~5 B' 1 P~d~ose Doug Ma[rshall Doug S~ Date Date % Date Dfite RECEIVED APR 0 4 2000 ~a~a Oil & Gas Cons. Commission Cross Timben )perating Company MGS C12-23 Cook Inlet, Alaska Leg 4, Conductor 26 APl No.: 50-733-20137-01 Spud: 3110190 * Surf Csg: 13 3/8", 54.5 lb, K55. Set @ 1389'. Cmt~d w/200 sx. Present Completion Prod Csg: 9 5/8", 43.5 & 47#, L80. Set @ 9866'. Cmt'd w/ 360 sx. TOL @ 9381'. 7" Liner. 26 L80 (9381-10457'), 32# P110 (10475-11737'). Cmt'd wi 771 sx G. Liner top sqz wi 100 sx G, tested to 3500~ ok PBTD; 11711' MD (8737' TVD) TD: 11895' MD (9858' TVD) Prepared by: jrs 5113199 Checked by: KB: 105' Water Depth: 73' MSL Tubing: 2-7/8", 6.5~, L80 EUE 8rd MOD Item 'I'VD MD Ptro Port Otis SSSV 300' 300' Gas Lift Valve #1 1770' 1784' 950 12 Gas Lift Valve #2 3146' 334Z 950 12 Gas Lift Valve #3 4318' 4868' 950 - 12. Gas Lift Valve ~4 5321' 6235' 1000 15 Gas Lift Valve #5 6144' 731T' 1000 16 Gas Lift Valve #6 6780' 8118' 998 - 16 Gas Lift Valve #7 7278' 866T 1099 20 Gas Lift Valve ~ 7801' 9215' 1096 20 ' Gas Lift Valve #9 8298' 9733' 1093 20 Gas Lilt Valve #10 8792' 10283' 1092 20. Gas Liff Valve #11 9185' 10801' Orffifce 5 RECEIVED 04 2000 ,AJa'~ka 0il & Gas Cons. Commission Anchorage One JL Tubing ~ 10815' MD (9194' TVD) One Jt. Tubing 2 10849' MD (9216' TVD) Baker Seal Assmy ~} 10881' MD (9235' TVD) Baker PBR ~ 10882' MD (9236' TVD) Baker "HB" Packer ~} 10897' MD (9246' TVD) One Jt. Tubing ~ 10904' MD (9252' TVD) Otis "XN' Nipple {~ 10935' MD (9272' 'I'VD) (2.205'1) 1 PUP Jt. ¢~} 10937' MD (9273' 7VD) Otis WL Re-enl3¥ Guide ~} 10946' MD (9278' TVD) End of Tubing ~} 10947' MD (9279' TVD) Otis "XD"Sliding Sleeve {~ 10846' MD (9214 TVD) HC-HD: 10984'-11010' (9301;9317' TVD) HE-HF: 11078'-11120' (9357'-9381' TVD) HI-HK: HK-HN: HN-HR: HN-HR: HR-HZ: 11190;11236' (9421'-9447' TVD) 11280'-11358' (9472,-9517' TVD) 11398'-11412' (9540'-9548' TVD) 11416'-11510. (9550'-9607' TVD) 11564'-11668' (9641'-9709' TVO) Cross ?imber~--i)perating Company Proposed Completion MGS C12-23 Cook Inlet, Alaska Leg 4, Conductor 26 APl No.: 50-733-20137.01 Spud: 3110190 ' Surf Csg: 13 3/8", 54.5 lb, K55. Set @ 1389'. Cmt'd w/200 sx. Prod Csg: 9 5/8", 43.5 & 47#, L80. Set @ 9866'. Cmt'd w/ 360 sx. TOL @ 9381'. 7" Liner:. 28 L80 (9381-10457'), 32# P110 (10475-11737'). Cmt'd w/771 sx G. Liner top sqz w! 100 sx G, tested to 3500# ok PBTD: 11711' MD (9737' TVD) TD: 11895' MD (9858' TVD) Prepared by: irs 5113199 Checked by: KB: 105' Water Depth: 73' MSL i ltem C~--R"~-2:188-~ '2 i~" ~.~ ~u ~ ~Z i~u~/.~ u~ ~ ~r~ml wl mj ~r, Vol Va~e ;item i r~aKer LU pKr pup,p: z pupjtz i Length! 12i) lll4Ui ~ '~'~'~b3 J 6 ~luui RECEIVED / PR 0 4 2000 Alaska 0ii & Gas Cons. Commission Anchorage HC-HD: 10984'-11010' (9301'-931T TVD) HE-HF: 11078'-11120' (9357'-9381° TVD) HI-HK: HK-HN: HN-HR: HN-HR: HR-HZ: 11190'-11236' (9421'-9447' TVD) 11280-11358' (947Z-951T TVD) 11398'-11412' (9540'-9548' TVD) 11416'-11510' (9550-9607' TVD) 11564'-11668' (9641'-9709' TVD) i I ~"~ I) " m II , , m m · ~ ,,~ imm mmm m ,, m m m m II m m m m I I II t ...... F x , ~ ~ ~ mm m , F~ ' ? m~ ~ ,, m ~ "' ~ ~' m ~ m ' [ ! , ,, ' m m m ~- j,,, ~ I ~~,- 1 ! i · ~-~ _ 111 lr~ j~ .__~~.1~. I ..b- Ill ' Ill _ _ imm ' JH ,. .-,~ ,,~ ~. ~ ~ ~ ,.. , .~ I il l I _ -, ~ r ~ ill , , , , _ Ill .,~ _ ~a~ m m m ~ ~ ~ m~ m m ~ ~mI Ill ' k .d I Ii L,~ ~&_ Il! ~.%~ ~ , -. ~'r~ Ill , , , , ~ m .... .. ,_ ~[~. ~ ,, , I : -- _ _ i . iii ~ --'~ III / / 111 , I I~: t ~ ]' I 11 ~ ,~ m J X 1 1 Iii .) Shell Western E&P Inc. 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 July 23, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen' SUBJECT- SUBMISSION OF THE WELL COMPLETION OR RECOMPLETION REPORT AND LOG FOR MIDDLE GROUND SHOAL WELL C12-23 Enclosed in duplicate is the Well Completion or Recompletion Report and Log for Middle Ground Shoal well C12-23. The well was spud on March 10, 1990 and completed June 23, 1990. This should complete the reporting for this well. If you have any questions regarding this report, please contact Susan Brown-Maunder at (907) 263-9613. Very Truly Yours, W. tr. Simpson Manager Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosure \DRILL ING\C 12- 23 \072390. DOC bc: C. M. Kidwell, WCK 1178 B. N. Osborn, Kenai R. R. Wagner, Anchorage P. T. Huckabee, Anchorage File 5.6120 C12-23 Production, WCK 4100 Reading File, Anchorage Reading File, Houston RECEIVED \DRILL ING\C 12- 23\072390. DOC STATE OF ALASIC~ .--~., nulcl iAL u.,.,,..-.--' -OIL AND GAS CONSERVATION CO~4MISSION CONPLETION OR RECONPLET]ON REPORT AND LOG 1. Status of Well CLassification of Service Vel[ OIL (X) GAS ( ) SUSPENDED ( ) ABANDONED ( ) SERVICE ( ) 2. Name of Operator 7. Per .,r. iNA t SHELL WESTERN E&P, INC. 90-20 -- ~J 3. Address 8. API Number 601 West Fifth, Suite 800, Anchorage, AK 99501 50-7'53-20137-01 Platfor~ "~", Leg 4, Conductor 26~'~~DAT~'I [ L~'~-~"~'?l ! ~i~:! Middle Ground Shoal At Top Pr6ducing Interval 10. Well Nunber 285~Fr.~& 2;~5~+' ~"of surface location z~V~R/[FLED i~ ~ i C12-23 ~ ~£;:.:~,.':, ,,7..-::3 11. Field and Pool At Total Depth 2.~..~"&A4~2Er'1~-of surface Location ~A~_A ~ A.~%~ ¢~L_.:~-,;, z~ TR/v" ~ I~v~ ~. Middle Ground Shoal 5. ELevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. E, F, & G Pool 105' KB ADL 18756 12' Date s~dd~ 113' Date T'D' eeach~ 114' Date C~" Susp' °r A~nd' 115' Water Oepth'03/10/go 05/06/90 06/23/90 ~if offshore 16. No. of Completions 'feet MSL 1 17. Tota111,895Depth+ 9,858(MD+TVD) 118' PLug11,711Back+ 9,737Depth (MD+TVD) 119~EsDirectionaL(x) NO Survey( ) 20. 300Depth wherefeetSSSVMDSet 21. ThickneSSfrost N/A°f Perma- I I 22. Type ELectric or Other Logs Run Gyrodata Gyro; Atlas PCL; SL-CHT-PCM-CN-CDL-DIFL/DIP-GR/SBT-GR-CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 54.5 # K-55 0 1,389 17-1/2" 200 SX "G" Cement + Additives 0 9-5/8" 43.5 & 47 # L-80 0 9,866 12-1/4" 360 SX "G" Cm~nent + Additives 0 7" 26 & 32 # L-80&P-110 9381 11,7'57 8-1/2" 771 SX "G" C~nt + Additives 0 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) Top Bottom SIZE DEPTH SET (MD) PACKER SET (MD) Interval MD TVD MD TVD Size No. 2-7/8" 10,947' 10,897' HC'HD 10,894 9,301 11,010 9,317 0.37 105 HE'HC 11,078 9,357 11,120 9,381 0.37 169 HI'HK 11,190 9,421 11,236 9,447 0.54 185 HK'HN 11,280 9,472 11,358 9,517 0.54 312 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. HN'HR 11,398 9,540 11,412 9,548 0.37 57 HN'HR 11,416 9,550 11,510 9,607 0.54 340 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED HR'HZ 11,564 9,641 11,668 9,709 0.54 375 11,564' ' 11,668' 34,308# 20'40 ISP 11,416' ' 11,510' 54,000# 20'40 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas Lift, etc.) 06/19/90 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 07/08/90 12 TEST PERIOD · 159 59 2 128/64I 371 FLow Tubing Casing Pressure CALCULATED FOR OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (corr) Press. 90 615 24-HOUR RATE · ~18 118 4 35.5 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of l~gr i~r¥~ r~belit core chips. N/A ~JUL 2,199~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ~Ja~ka.Oi! a Gas C0ns..G~. mmis~"~t in dup[icate 29. GEOLOGICAL MARKERS 30. .~RMATION TESTS Include interval tested, pressure data, all fluids recovered NAME MEAS. DEPTH TRUE VERT. DEPTH and gravity, GOR, and time of each phase. N/A N/A N/A N/A 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge (,~_~ j~S i g?ed ~,~__ Title ALaska Date 07/23/90 Manager, Operations INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Log on all types of lands and Leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing too[. item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. item 28: If no cores taken, indicate "none". Form 10-407 DAILY REPORT OF OPERATIONS C12-23 DATE DESCRIPTION 03/10/90 DRLG F/323~ T/328~, HARD CEMENT. CLEANING PITS AT REPORT TIME. 03/11/90 CLEAN OUT CONDUCTOR W/SEAWATER; DRLG F/328~ T/370~ W/BIT #2RR. DISPLACED SEAWATER W/MUD AT 370~. CIRC. HOLE CLEAN. POH W/CLEAN OUT ASSEMBLY. TIH T/370~ W/KICK-OFF ASSEMBLY. ORIENT DRLG W/GYRO-DATA SURVEYS/MUD MOTOR F/370~ T/538~. SURVEYS INDICATE ASSEMBLY IS FOLLOWING "OLD" 9.875" HOLE THAT WAS DRILLED DURING METAL MUNCHING OPERATIONS TO 612~. (GYRO WAS 94~ BEHIND BIT). POH W/MUD MOTOR ASSEMBLY AT REPORT TIME. 03/12/90 STAND BACK MUD MOTOR ASSEMBLY. PICKED UP 9 jts 3.5" TBG, XO, AND DRILL PIPE AND TIH T/538~. CIRC./COND. RAN GYRO AND SURVEYED AT 535~. CIRC./COND. FOR CEMENT. HELD SAFETY MEETING W/ALL HANDS. RIG AND TEST HOWCO LINES T/2000 PSI. OK. PUMPED 50 BBLS OF FRESH WATER AHEAD OF 422 SX~S CLASS "G" CEMENT PLUS 1.25% CFR-3 PLUS 2% CACL2. USED 42.2 BBLS WATER TO MIX 16.6 PPG SLURRY. DISPLACED W/1BBL FRESH WATER FOLLOWED BY 4 BBL OF 8.9 PPG MUD CIP AT 1830 HOURS 03/11/90. HAD VERBAL APPROVAL FROM MR. MINDER OF AOGCC TO PLUG BACK. EST TOP OF CEMENT TO BE 345~. POH. WAIT ON CEMENT. 03/13/90 LAYED DOWN HWDP FROM DERRICK WHILE WOC. TIH W/KICK-OFF BHA. TAGGED HARD CEMENT AT 314~. DRLG F/314~ T/377~ ROTATING KICK-OFF ASSEMBLY. ORIENT AND DRILL AHEAD W/GYRO-DATA TO 416~. LOST 450 PSI PUMP PRESSURE. GO THROUGH PUMPS, POH LOOKING FOR WASH OUT, FOUND NONE. #1 PUMP WAS BAD. TIH, REPAIRED ~UMP. ORIENT AND DRILL AHEAD F/416~ 5/527~ W/GYRO-DATA. MOTOR STALLED. POH, LAYED DOWN MWD. MADE UP TBG CEMENTING STINGER (gjts OF 3.5"TBG). TIH T/527~. CIRC. 10 MINS TO CLEAR TBG. RAN GYRO. CONFIRMED BIT WAS AGAINST C24-23. CIRC./COND. FOR PLUG BACK. 03/14/90 CIRC./COND. RIG HOWCO TO LAY PLUG. HELD SAFETY MEETING W/ALL HANDS. TEST LINES T/2000 PSI. OK. PUMPED 50 BBLS OF FRESH WATER AHEAD OF 340 SX OF CLASS "G" CEMENT PLUS 2% CACL2 PLUS 1.25% CFR-3. USED 34 BBLS MIX WATER, 16.6 PPG, 63 BBLS OF SLURRY. DISPLACED W/1 BBL OF FRESH WATER FOLLOWED BY 4 BBLS OF 8.9 PPG MUD. CIP AT 2145 HOURS 03/13/90. HAD VERBAL APPROVAL FROM MR. LONNIE SMITH OF AOGCC TO LAY PLUG. WOC. TIH W/MUD MOTOR ASSEMBLY. TAG HARD CMT AT 336~. CLEAN OUT CONDUCTOR F/336~, T/375~ DRLG HARD CEMENT. ORIENT MUD MOTOR. BIT JETS PLUGGED. POH, UNPLUG JETS/CNG OUT MUD MOTOR. BRG PACK LEAKING \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. I EXCESSIVELY WHEN PULLED. (BLEW SEALS WHEN JETS PLUGGED). WASH FILL/CNG OVER T/MUD F/SEAWATER F/328' T/375~. ORIENT TOOLS W/DIA-LOG AND GYRO-DATA. DRILL/SURVEY W/GYRO-DATA AND DIA-LOG F/375' T/441' AT RPT TIME. 03/15/90 DRLG/SURVEY W/GYRO-DATA AND DIA-LOG F/441' T/472' W/BIT #3. POH. LAY DOWN 1.75 DEG BENT SUB. PICKED UP 1.5 DEG BENT SUB AND MWD. TIH T/472'. ORIENT, DRLG AHEAD W/MUD MOTOR 1/491. MOTOR STALLED. POH. STOOD BACK MUD MOTOR ASSEMBLY. TIH W/17.5" BIT, NB STAB, 2 DC'S, STAB, 4 DC~S, XO AND HWDP T/SHOE. REAM OUT MOTOR RUN F/370' T/491'. CIRC./COND. F/SURVEY. RAN GYRO-DATA ON DIA-LOG WIRELINE F/SURVEY AT 487'. PROD DEPT. BLED OFF PRESSURE FROM C42-23 AND C-LINE WELL. ATTEMPT TO WORK BY C42-23. NO SUCCESS. POH, LAY DN 17.5" BIT. MAKE UP 9 7/8" BIT. TIH T/491'. ATTEMPT TO WORK BY C~2-23 W/SMALLER PILOT BIT. KEPT GOING ALONGSIDE C42-23 T/502 . UNABLE TO GET AWAY FROM C42-23. CIRC./COND. F/CEMENT. POH 2/9 7/8" BIT. LAY DOWN SAME. MADE UP 3.5" MULESHOE ON 9 jts 3.5"TBG, XO, DP. TIH T/499'. RIG HOWCO LINES, CLEAN PIT FOR MIX WATER WHILE CIRC./COND FOR PLUG. 03/16/90 CIRC. AND COND. FOR CEMENT PLUG. CLEAN PIT FOR MIX WATER, RIG UP HOWCO LINES, MIX CEMENT MIX WATER, TEST LINES @ 2000 PSI. PUMP 50 BBLS FRESH WATER AHEAD, MIX AND PUMP 281SX "G" + 2% CACL2 + 1.25% CFR-3 MIXED @ 16.6 PPG, FOLLOWED BY 1BBL FRESH WATER. DISPLACE WITH 4 BBLS MUD, CEMENT IN PLACE @ 1150 HOURS 03/15/90. POOH, LAY DOWN EXCESS 5" DRILL PIPE AND 3.5" TUBING FROM DERRICK. WAIT ON CEMENT, SLIP AND CUT 100' DRILL LINE, SERVICE RIG, INSPECT MUD PUMPS, M/U KICKOFF ASSEMBLY, LAY DOWN MUD. RIH, TAG CEMENT @ 348', DRILL CEMENT 5/375'. CIRC. HOLE CLEAN, ORIENT BENT SUB WITH GYRO SURVEY. DRILL WITH MUD MOTOR FROM 375' TO 410'. GYRO SURVEY. DRILL WITH MUD MOTOR FROM 410' TO 441'. GYRO SURVEY AT REPORT TIME. NOTE: RECEIVED VERBAL APPROVAL FROM LONNIE SMITH WITH AOGCC TO SET CEMENT PLUG FOR PLUG BACK. 03/17/90 DRILL WITH MUD MOTOR T/503'. POOH, CHANGE 1.75 DEGREE BENT SUB TO 1.5 DEGREE, ORIENT BHA, RIH TO 503'. SURVEY, ORIENT. DRILL WITH MUD MOTOR AND GYRO SURVEY 17.5" HOLE F/503' T/625'. POOH. PICK UP MWD, CHECK BIT, TIH. DRILL 17.5" HOLE WITH MUD MOTOR FROM 625' TO 1032', GYRO SURVEY. 03/18/90 DRILL 17 1/2" HOLE WITH MUD MOTOR AND GYRO SURVEY FROM 1032' TO 1311'. CHECK FLOW, POOH, STAND BACK MOTOR ASSEMBLY IN DERRICK. M/U BIT # 2RR AND CLEAN OUT ASSEMBLY, P/U DRILLING JARS. TIH WITH CLEAN OUT ASSEMBLY TO 370', HIT BRIDGE, WASH AND REAM CLEAN OUT ASSEMBLY TO BOTTOM. CIRC. HOLE CLEAN. GYRO SURVEY. CHECK FLOW, POOH, STAND BACK CLEAN OUT ASSEMBLY IN DERRICK. M/U MOTOR ASSEMBLY, RIH AT REPORT TIME. 03/19/90 ORIENT MOTOR, DRILL F/1311' T/1352' WITH MUD MOTOR. POOH, MAKE UP DRILLING CLEAN OUT ASSEMBLY, RIH T/1342'. WASH AND REAM FROM 1342' TO 1352'. GYRO SURVEY WITH DIALOG AND GYRO-DATA. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 2 POOH, MAKE UP MOTOR ASSEMBLY, RIH. ORIENT MOTOR AND BENT SUB, DRILL 17 1/2" HOLE WITH MUD MOTOR FROM 1356~ TO 1389~. CHECK FLOW, POOH, STAND BACK MOTOR ASSEMBLY. MAKE UP BIT #2RR, TIH WITH DRILLING CLEAN OUT ASSEMBLY. REAM FROM 1345~ TO 1389~. GYRO SURVEY. CIRC. AND COND.. MUD FOR CASING. MAKE UP SHOE JOINT, PICKUP AND RUN 12 JOINTS 13 3/8" 54.5# BT&C CASING, HIT BRIDGE @ 505~. ATTEMPT TO WORK CASING PAST BRIDGE @505~,, R/U CIRC. SWEDGE, ATTEMPT TO WASH CSG. PAST BRIDGE. LOST CIRCULATION. POOH WITH 13 3/8" CASING AT REPORT TIME. 03/20/90 POOH, L/D 13 3/8" CASING. RIG DOWN CSG. TOOLS. MAKE UP CLEAN OUT BHA, P/U STAB, RIH T/425~. WASH AND REAM F/425~ ~/1389~. CHECK FLOW, POOH, P/U LEAD COLLAR AND STAB, TIH 5/380 . WASH AND REAM F/380~ T/1389~. CIRC. AND COND. MUD FOR CASING. CHECK FLOW, POOH, STAND BACK CLEAN OUT ASSEMBLY IN DERRICK. RIG UP TO RUN CSG, MAKE UP FLOAT EQUIPMENT, FUNCTION TEST DIVERTER, P/U AND RIH WITH 37 jts 13 3/8" 54.5# K-55 BTC CSG. TO 1389~. GUIDE SHOE SET @ 1389~ FLOAT COLLAR @ 1348~. RIG UP HOWCO CEMENT HEAD AND CEMENT LINES. CIRC. AND COND. MUD FOR CEMENT JOB, MIX CEMENT WATER AT REPORT TIME. 03/21/90 TEST HOWCO LINES @ 2000 PSI, PUMP 50 BBLS FRESH WATER AHEAD, MIX AND PUMP 200 SX "G" + 10% GEL +.2% CACL2 + .5% CFR-3 MIXED @ 12.8 PPG, FOLLOWED BY 200 SX "G" + .2% CACL2 + .5% CFR-3 MIXED @ 15.8 PPG, DISPLACE WITH 210 BBLS INLET WATER. BUMP PLUG WITH 1500 PSI, CEMENT IN PLACE @ 0600 03/20/90. WOC, RIG DOWN DIVERTER SYSTEM, PREPARE TO NIPPLE DOWN DIVERTER. BLEED OFF PRESSURE ON 13 3/8" CSG, RAISE 20" DIVERTER, ROUGH CUT CSG. REMOVE FLOW NIPPLE, HYDRIL AND RISER. RIG UP FOR TOP JOB, RUN 1" PIPE TO 161~ KB, PUMP 250 SX "G" + 1% CACL2 MIXED @ 15.8 PPG, NO CEMENT TO SURFACE, LOST CIRCULATION, RIG DOWN HOWCO LINES. MAKE FINAL CUT ON 13 3/8" CASING, WELD ON CIW 13 3/8" 2M X 13 5/8" 3M "WF" CASING HOUSING, TEST SAME @800 PSI FOR 30 MIN. N/U BOPE AT REPORT TIME. NOTE: RECEIVED VERBAL WAIVER FROM DOUG AMOS W/AOGCC TO WITNESS BOPE TEST. 03/22/90 NIPPLE UP BOPE. P.U TEST PLUG, TEST BOPE: TEST ALL RAMS, LINES, AND VALVES @ 250/3000 PSI, TEST ANNULAR PREVENTER @ 250/3000PSI, TEST KELLY, ROTARY HOSE, AND STANDPIPE @ 250/3000 PSI, TEST ALL SAFETY VALVES AND FLOOR VALVES @ 250/3000 PSI, 03/23/90 DRILL 12 1/4" HOLE FROM 1365~ TO 3170~ SURVEY WITH ANADRIL MWD @ 90~ STATIONS. 03/24/90 DRILL F/3170~ T/3201~ CHECK FLOW, POOH, L/D STAB~S, STAND BACK STEEL DC~S. M/U BIT # 5, M/U MUD MOTOR, AND 1.5 DEGREE BENT SUB, TEST MWD AND MUD MOTOR, RIH WITH MOTOR ASSEMBLY. WASH AND REAM WITH MUD MOTOR F/3118~ T/3201~ ORIENT MOTOR, DRILL AND SURVEY WITH MUD MOTOR F/3201~ T/3450~ CHECK FLOW, POOH WITH MOTOR ASSEMBLY, LAY DOWN MUD MOTOR, L/D BIT #5 PICK UP MONEL WITH CLAMP ON STAB., MAKE UP DRILLING ASSEMBLY, MAKE UP BIT #6, RIH AT REPORT TIME. DULL BIT GRADE: #4 5-4-WT-BT-M-E-3-PR #5 2-2-WT-A-E-1-BHA \DRILLING~C12-23~DAILYRPT.DOC PAGE NO. 3 03/25/90 RIH WITH BIT # 6 TO 2892~, HIT BRIDGE KELLY UP, WORK THRU BRIDGE @ 2892' RIH T/3125', L/D 6 jts. DRILL PIPE. REAM F/3125' T/3450' DRILL AND SURVEY F/ 3450~ T/ 3550' CHANGE PUMP LINER AND SWAB IN #1 PUMP. DRILL AND SURVEY FROM 3550~ T/4078' CHECK FLOW, PUMP PILL, POOH FOR BHA, LAY DOWN MONEL W/ CLAMP ON STAB, P/U MONEL, P/U LEAD COLLAR, MAKE UP BIT # 6RR, CHECK STAB, RIM T/4078', DRILL AND SURVEY F/4078' T/4287'. 03/26/90 DRILL AND SURVEY F/4287' T/4719~ CHECK FLOW, PUMP PILL, POOH WITH BIT # 6RR, CHANGE BHA, L/D LEAD COLLAR, MAKE UP BIT #7, RIH T/ 4600~, HIT BRIDGE WASH AND REAM BRIDGE @ 4600', WASH T/4719' DRILL AND SURVEY 12 1/4" HOLE F/4719' T/5049' BIT #6 DULL GRADE: 4-3-WT/BT-M-E-1-BHA 03/27/90 DRILL AND SURVEY F/5049' T/5806' 03/28/90 DRILL F/5806~ T/5809' CHECK FLOW, PUMP PILL, POOH W/BIT #7, CHANGE OUT N/B STAB. SLEEVE, P/U EXTENSION SUB, CHECK MWD SCREEN, M/U BIT #8, RIH CUT AND SLIP 100' DRILL LINE @ 13 3/8" CASING SHOE, FILL PIPE. RIH T/5809' DRILL 12 1/4" HOLE AND SURVEY F/5809' T/6369' BIT #8: 8-8-BT-A-E-4-LT-PR 03/29/90 DRILL AND SURVEY 12 1/4" HOLE F/6369' T/6525' 03/29/90 SURVEY, CHECK FLOW, PUMP PILL, POOH WITH BIT #8 LAY DOWN EXT. SUB, MAKE UP BIT # 5RR, CHANGE OUT STAB. SLEEVES, TEST MWD, RIH, FILL PIPE @ SHOE DRILL AND SURVEY 12 1/4" HOLE F/6525' T/6720'. BIT #8: 8-8-BT-A-F-I-LT-PR 03/30/90 DRLG/SURVEY W/MWD F/6720' T/6842' W/BIT #5RR. CHECKED F/FLOW, NONE. POH, LAYED DOWN SLEEVE TYPE STAB AND BIT. DID WEEKLY BOPE TEST. MAKE UP NEW BIT ON NEAR BIT WELDED BLADE STAB. PICKED UP EXT SUB ON TOP OF BOTTOM MONEL DC. DRLG/SURVEY W/MWD F/6842' T/6925' W/BIT #9. 03/31/90 DID 5 POINT CHECK SHOTS W/MWD. DRLG/SURVEY W/MWD F/6925~. T/7206~ W/BIT #9. DRLG/SURVEY W/MWD F/7206' T/7535' W/BIT #9. BIT #5RR COND.: 8-5-BT-M-E-I-ER-PR 04/01/90 DRLG/SURVEY W/MWD F/7535' T/7585' W/BIT #9. CHECK F/FLOW, NONE. POH. CHANGED OUT JARS, MWD, NB STAB, BIT. TIH. NOTE: CHANGED PUMP LINERS/PISTONS F/5.5" T/7" WHILE POH/TIH. REAM 50' T/BOTTOM. DRLG F/7585' T/7651' W/BIT #10. DID 5 POINT MWD SURVEY'S. DRLG/SURVEY W/MWD F/7651~ T/7735' W/BIT #10. NOTE: BIT #10 IS 12.25" BIT. BIT #9 COND.: 7-7-BT-A-E-2-SD-BHA 04/02/90 DRLG/SURVEY W/MWD F/7735' T/7868' W/BIT #10. (DROP OFF POINT) CHECKED F/FLOW, NONE. POH. LAYED DOWN NB STAB, LC. REPLACED WORN STABS ABOVE AND BELOW MWD. TIH W/BIT #11. FILL PIPE AT 4637'/CHECK MWD. OK FINISHED TIP IN HOLE. DRLG F/7868' T/7935' W/BIT #11. DID 5 POINT CHECK SHOT W/MWD. DRLG/SURVEY W/MWD F/7935' T/8025' W/BIT #11. BIT #10 COND.: 2-2-WT-A-E-I-NO-BHA \DRILLING~C12-23~DAILYRPT.DOC PAGE NO. 4 04/03/90 DRLG/SURVEY W/MWD F/8025' T/8443' W/BIT #11. CHECK F/FLOW, NONE. POH F/NEW BIT AT REPORT TIME. 04/04/90 FINISHED POH, CNG BIT. TIH T/CSG SHOE. CDL 100'. FINISHED TIH W/BIT #12. DRLG/SURVEY W/MWD F/8443' T/8667' W/BIT #12. WORK TIGHT CONN AT 8667'. DRLG/SURVEY W/MWD F/8667' T/8850' W/BIT #12. BIT #11 COND.: 3-3-BT-M/A-E-I-WT-PR/HOUR 04/05/90 DRLG F/8850' T/8857'. LOST 500 PSI OF PUMP PRESSURE. CHECK OUT SURFACE EQUIP. NOTHING FOUND. CHECK F/FLOW, NONE. POH (WET). NOTHING FOUND. CHANGE OUT ROTARY TABLE. DID WEEKLY BOPE TEST. OK. PRESSURE TESTING BHA AS TIH. NOTHING FOUND AS YET. BIT #12 COND.: 1-1-NO-A-E- I-NO-PP 04/06/90 FOUND VERTICAL SPLIT IN THE BOX OF A JT OF HWDP. 6" LONG SPLIT. LAY DN 2 jts HWDP, PICKED UP 2 NEW ONES. FINISHED TIH T/8758'. WASH/WORK F/8758' T/8857'. DRLG F/8857' T/8898' W/BIT #12RR. DID 5 POINT MWD SURVEY. DRLG/SURVEY W/MWD F/8898' T/8959 W/BIT #12RR. WORK TIGHT HOLE ON A CONNECTION AT 8926'. (COAL) DRLG/SURVEY W/MWD F/8959' T/9122' W/BIT #12RR. 04/07/90 DRLG/SURVEY W/MWD F/9122' T/9173' W/BIT #12RR. LOST 500 PSI PUMP PRESSURE. CHECKED OUT SURFACE EQUIP. NOTHING FOUND. CHECKED F/FLOW, NONE. POH W/ WET STRING. NOTHING FOUND. CNG BIT/STAB SLEEVE ABOVE MWD. PRESSURE TEST BHA GOING IN HOLE. NOTHING FOUND. TIH T/3626', MT. REDOUBT VOLCANO ERUPTED, ASH CLOUD MOVING RAPIDLY. TOWARD RIG. POH T/SHOE. SECURED DRILLING ENGINES/GENERATORS. CUT DRLG LINE 100' WHILE MONITORED ASH CLOUD. NORTH WIND FRESHENED AND MOVED ASH OFF IN A MORE SOUTHERLY DIRECTION. FIRED UP ENGINES/GENS. TIH, FILLED PIPE AND CHECKED MWD AT 4463'. OK. PUMP PSI NORMAL ALSO. DRLG/SURVEY W/MWD F/9173' T/9280 W/BIT #13. BIT #12RR COND.: 3-3-CT-H/M-E-I-NO-WO 04/08/90 DRLG/SURVEY W/MWD F/9280' T/9334' W/BIT #13. WORK TIGHT HOLE T/MAKE CONNECTION AT 9334'. DRLG/SURVEY W/MWD F/9334' T/9357' W/BIT #13. CHECK F/FLOW, NONE. POH. CNG BNA/BIT. TIN. FILL PIPE/TEST MWD AT 4446' OK. FINISHED TIH W/BIT #14. DRLG'F/9357' T/9367' WORK TIGHT HOLE. (COAL) DRLG F/9367' T/9398' WORK TIGHT HOLE AT 9398' (COAL) DRLG F/9398' T/9410' W/BIT #14. BIT #13 COND.: 1-1-NO-A-E- I-NO-BHA 04/09/90 DRLG F/9410' T/9436' W/BIT #14. ROTARY CHAIN BROKE. CIRC./COND. WHILE REPLACING CHAIN. WHILE PUTTING ON THE CHAIN GUARDS NOTICED A 500 PSI DROP IN PUMP PRESSURE. SURFACE EQUIP. CHECKED OUT OK. FINISHED INSTALLING CHAIN GUARDS W/PUMP OFF. STARTED OUT OF HOLE F/WASHOUT. PULLED 167' OFF BOTTOM AND PIPE PARTED SHALLOW. MOBILIZING FISHING TOOLS. POH. RECOVERED 939' OF DRLG PIPE AND 19" OF ANOTHER JT. (BOX & 7" OF PIPE) MAKE UP TRI- STATE OVERSHOT LOADED W/5" BASKET GRAPPLE/PACK-OFF AND MILL CONTROL. TIH, FOUND TOP OF FISH AT 946'. WORK OVER FISH. POH T/TOOLS. LAY DOWN TOOLS AND 28' FISH OF S-135 DP. CHECK F/FLOW, \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 5 NONE. POH T/HWDP. LAYED DOWN 15 jts OF BENT "G" PIPE. INSPECTING BHA AT REPORT TIME. 04/10/90 FINISH INSPECT BHA. CNG OUT 2 MONELS, I STEEL DC, NB STAB AND MWD. LAY DOWN HWDP, JARS. TIH T/3100~ W/BENT "G" PIPE. POH LAYING DOWN THE BENT jts. RAN THE REST OF THE "G" PIPE IN HOLE, POH LAYING DOWN THE BENT ONES. TOTAL OF 75 BENT jts OF "G" PIPE LAYED DOWN. PICKED UP NEW HWDP/NEW JARS/"G" DRILL PIPE AND TIH AT RPT TIME. BIT #14 COND.: 1-1-NO-A-8-8-NO-WO/DSF 04/11/90 FINISH TIH T/BRIDGE AT 9327'. WASH/REAM/WORK THRU BRIDGE AND TIGHT HOLE F/9327' T/9436~. DID 5 POINT MWD SURVEYS. DRLG/SURVEY W/MWD F/9436/ T/9737~ W/BIT #15. HAD ONLY ONE TIGHT CONN AT 9556~. 04/12/90 DRLG/SURVEY W/MWD F/9737~ T/9866~ W/BIT #15. CIRC./COND. F/LOGS AT 9.625" CSG POINT. CHECK F/FLOW, NONE. SLM OUT OF HOLE F/LOGS. (NO CORRECTION) RIG UP ATLAS WIRELINE. RUNNING DIL/SP/GR/PCM/CHT AT RPT TIME. BIT #15 COND.: 1-1-BT-H/A-E-2-NO-TD 04/13/90 RUN ATLAS W/L DIL/SP/GR/PCM/CHT F/9854~ T/1392~. TAG BTTM @ 9858~ WLM P/U BNA, TIN T/1385~, FILL PIPE. SLIP & CUT 100~ OF DRILLING LINE. TIH W/BIT #13RR. VISUALLY INSPECT PIPE WHILE TIH. L/D 16 ea jts. OF G PIPE, 4 ea jts. OF S-135 PIPE. TIH T/9866~ DPM, NO FILL OBSERVED. CIRCULATE & CONDITION HOLE TO RUN 9.625" CASING. CHECK WELL FOR FLOW, PUMP PILL, POH. L/D DC~S & STABS. CHANGE BOPE TO 9.625" CSG RAMS. RUN INTEGRITY PRESS. TEST @ 3000#. R/U TO RUN 9.625" CASING @ REPORT TIME. NOTE: RECEIVED VERBAL NOTICE FROM MR. L. SMITH, AOGCC, TO DEFER WEEKLY BOPE TEST UNTIL 9.625" CSG. IS SET & CEMENTED. (4/11/90) 04/14/90 R/U TO RUN 9.625" CSG. HOLD SAFETY/ORGANIZATIONAL MEETING W/ALL HANDS. RUN 9.625" CSG. STRING AS FOLLOWS: FLOAT SHOE @ 9866~ - 9864~ (TOP) FLOAT COLLAR @ 9778~. BAKERLOCK 5 BTTM jts & JEWELRY. TEST FLOAT EQUIP 144 jts, 47#, L-80, LTC, M/U TORQUE @ 8900#. TOP @ 4018~. 95 jts, 43.5#, L-80, LTC, M/U TORQUE @ 8100#. CENTRALIZERS @ 9842, 9801, 9704, 9625, 9541, 9458, 9378, 9298, 9216 & 9132 (ft). "ON HOOK" WAS 9873~ W/7~ ABOVE RKB. RKB TO TOP OF "WF" FLG @ 39.80~ R/U HOWCO CMT HEAD/LINES. CIRCULATE/CLEAN ANNULUS W/RIG PUMPS 750bbls OF 9.8# MUD. UNABLE TO RECIPROCATE PIPE WITH 450K# MAX. PULL. HOLD PRE-JOB SAFETY & PLANNING MEETING PRIOR TO CEMENT JOB. PUMP 5 bbls FW (FRESH WATER), DROP PLUG #1, 5 bbls FW, TEST LINES @ 4000#, CHECK FLOAT, LOAD PLUG #2, PUMP 90 bbls OF FW W/HOWCO UNIT. PUMP 94 bbls OF LEAD CEMENT SLURRY; 360 SX OF "G" PREMIUM, 1.5% PRE-HYDRATED GEL, .4% CFR-3, 12% HOUR-7, @ 14.2#/g, YIELD OF 1.46 CF/SK. PUMP 41 bbls OF TAIL CMT SLURRY; 200 SX OF "G" .5% CFR-3, .05% LWL. 15.8#,l.15YLD, DROP PLG #2. DISPLACE W/5 bbls OF FW, SWITCH TO RIG PMP AND DISPLACE CEMENT W/721 bbls OF 9.8# MUD. BUMP PLUG & HOLD 1000# FOR 3 MIN. BLEED OFF PRESSURE, MONITOR FOR FLOAT INTEGRITY. GOOD. CEMENT IN PLACE @ 0100 HOURS 4/14/90. R/D CEMENT HEAD & HOWCO LINES. LIFT BOPE STACK \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 6 DRILLING RISER. PULL 335K# ON CSG, SET DOWN ON CAMERON 12 X 9.625" "AW" CASING HANGER WITH 325K# ON SLIPS. MAKE ROUGH & FINISH CUT ON 9.625" CSG. INSTALL CAMERON 13.625" 3M X 11" 5M "AP" TBG HEAD. TEST SEAL INTEGRITY AT 1410# FOR 15 MINUTES. GOOD. L/D I JT 9.625" @ 43.32#, L-80 LTC, JT # 11 @ 43.32~ + 2.5" CUT. THESE WERE USED FOR LANDING CASING IN "WF" HOUSING. PREPARE TO BEGIN DRAWWORKS REPAIR PROJECT. 04/15/90 WOC. N/U BOPE STACK & CHOKE LINES. BEGIN CLEANING PITS. BEGIN DRAWWORKS REPAIR PROJECT: HANG OFF BLOCKS & BACK OFF DRILL LINE F/DRUM. REMOVE DRILLER'S CONSOLE DRAWWORKS GUARDS, E-Z TORQUE & CLEAR RIG FLOOR WORK AREA. BREAKDOWN DRUM ASSEMBLY. REMOVE/REPLACE BRAKE FLANGES, HI/LOW DRUM (DRIVE) CHAINS & BRAKE BANDS. INSPECT CLUTCH ASSEMBLIES. REINSTALL SAME IN GOOD CONDITION. RESET DRUM ASSEMBLY. RE-INSTALL GUARDS & RIG FLOOR COMPONENTS. MUD SYSTEM ACTIVITY: CLEAN PITS, REPAIR GATES & VALVES. CHANGE PUMP LINERS F/7" T/5.5". FILL PITS W/FRESH WATER & PRE-HYDRATE GEL FOR KCL SYSTEM. START MIXING MUD. R/U AND PREPARE TO PULL ROTARY TABLE DRIVE ASSEMBLY. NOTE: AOGCC WAS NOTIFIED OF OUR INTENT TO TEST CASING & BOPE IN THE NEXT 24 HOURS. NOTICE WAS RECEIVED & LOGGED BY THE ANSWERING SERVICE, WHO INFORMED ME THAT NO REPRESENTATIVE WAS ON CALL DURING WEEKENDS. FURTHER THAT VERBAL NOTIFICATION WOULD SUFFICE. 04/16/90 CONTINUE DRAWWORKS REPAIRS AS FOLLOWS: REMOVE/REPLACE ROTARY TABLE, CHANGE OUT DRIVE SPOOL, REBUILD BACK BRAKE INSTALL ROTARY CLUTCH & TABLE LOCK ASSEMBLIES. FILL ROTARY TABLE W/LUBE OIL AND OPERATE. ADJUST DRAWWORKS. BRAKES. -REPLACE 90 ELLS IN CHOKE/KILL LINES W/TARGETED TEES. -REPAIR DAMAGED TRIP LOCK IN B-J HOOK. MUD SYSTEM ACTIVITY: MIX 900 bbls OF 1% KCL MUD. CHANGE OUT PUMP LINERS T/5.5". TEST BOPE: LOW TEST ALL VALVES, LINES & RAMS @ 250#. TEST BLIND & PIPE RAMS @ 5000#. TEST L/U KELLY COCK, S/V, KELLY HOSE, STD PIPE, MUD LINE, ALL KILL & CHOKE VALVES, HCR @ 5000#. ANNULAR PREVENTER @ 3500#. PERFORMANCE TEST ACCUMULATOR. RESET WEAR RING. M/U MUD MOTOR/MWD BHA. TIH W/BIT #16 BHA. SURFACE TEST MUD MOTOR & MWD OPERATION. FILL PIPE & ADJUST BRAKES @ 1300~ & 5000~. 04/17/90 TIH W/BIT #16 ASSEMBLY. FILL PIPE @ 9000~. TAG WIPER PLUG/TOP OF FLOAT COLLAR AT 9780~, NO CEMENT OBSERVED ABOVE PLUG. L/D SINGLES, CIRCULATE RUN CASING PRESSURE INTEGRITY TEST @ 2200# FOR 30 MINUTES. GOOD. DRILL OUT PLUGS & FLOAT COLLAR @ 9780~ T/ TOP OF SHOE @ 9865~. CIRCULATE OUT CEMENT CONTAMINATED MUD. DRILL OUT SHOE @ 9865~ & 10~ OF OPEN HOLE T/9875~. CBU. INITIATE FORMATION LEAKOFF TEST @ 9875~. TEST T/3100# W/9.9# MUD. NO FORMATION BREAKDOWN OCCURRED. EMW = 17.00#. ROTARY DRILL F/9875~ T/9885~. ORIENT BHA. DRILL AHEAD W/MUD MOTOR/MWD ASSEMBLY. F/9885~ T/10029~ AT REPORT TIME. 04/18/90 DIRECTIONAL DRILL W/MUD MOTOR/MWD BHA F/10029~ T/10175~. SURVEY EVERY 31~ (SINGLE CONN.). WORK TIGHT SPOT @ 10085~. POSSIBLY THE "GD" COAL SECTION. CIRCULATE MUD & TAKE BOTTOMHOLE SURVEY \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 7 W/MWD. POH T/CSG SHOE @ 9866~. L/D 11 jts. DP. CHECK FOR FLOW, PUMP PILL, POH. 04/19/90 POH W/BIT #16 BHA. L/D MWD & MUD MOTOR ASSEMBLIES. P/U BIT #17, 2 ea DC. TIH W/BIT #17 BHA T/9850~. SLIP & CUT 100~ OF DRILLING LINE. P/U KELLY & REAM MOTOR RUN F/9866~ T/10175~. CIRCULATE BOTTOM SECTION. POH T/CSG SHOE @ 9866~. CLEAN MUD PITS. FILL W/PREMIXED 1% KCL MUD W/LIQUID CASING ADDITIVE. R/U SURVEY RETRIEVAL WIRELINE, REPAIR KELLY SPINNER MOTOR. TIH T/10175~. DRILL F/10175~ T/10290~. DISPLACE W/KCL MUD. WORK TIGHT SPOT @ 10240~. CIRCULATE & CONDITION HOLE FOR SURVEY. DROP SS SURVEY TOOL. MONITOR WELL FOR FLOW. POH T/CSG SHOE. RETRIEVE SURVEY W/WL. SURVEY GOOD. TIH T/10290~. DRILL W/BIT #17 BHA F/10290~ T/10375~ @ REPORT TIME. BIT #16 EVALUATION: 5-7-BT-A-E-2-ER-BHA 04/20/90 DRILL W/BIT #17 T/10382~. CIRC./COND. FOR SURVEY. REVISED CHECK FOR FLOW, DROP SS SURVEY. POH T/CSG SHOE. RIH W/SLICK LINE TO RECOVER SURVEY. CIRCULATE & CONDITION MUD. REVIEW SURVEY RESULTS. SERVICE RIG. CHECK FOR FLOW, PUMP PILL, POH TO CHANGE BHA. L/D BIT #17 BHA. M/U BIT #18 BHA. TIH W/BIT #18 BHA. STOP & FILL PIPE @ 5118~, 9860~. TIH T/10337~. WASH & REAM 45~ T/10382~. DRILL T/10447~. CIRCULATE & CONDITION MUD, CHECK FOR FLOW, DROP SURVEY. POH T/CSG SHOE. RETRIEVE SURVEY. TIH. DRILL F/10447~ T/10525~ @ REPORT TIME. BIT #17 EVALUATION: 3-3-BT-H-E-I-WT-BHA. 04/21/90 DRILL W/BIT #18 BHA F/10530~ T/10601~. CIRCULATE & CONDITION HOLE FOR SURVEY. CHECK FOR FLOW, DROP SURVEY. POH T/CSG"SHOE FOR SURVEY RECOVERY. RETRIEVE SURVEY. REVIEW DIRECTIONAL DATA. SERVICE RIG. CHECK FOR FLOW, PUMP PILL, POH TO CHANGE BHA. L/D BIT #18 BHA. P/U BIT #19 BHA. TIH, STOP & FILL PIPE @ 5144~, 9860~. TIH T/10575~. WORK TIGHT SPOT @ 10580~. DRILL F/10601~ T/10633~. ENGAGE COAL SEAM @ 10633~. DRILL STRING STUCK ON BOTTOM AT BIT. UNABLE TO ROTATE OR JAR DOWN. WORK & JAR UP ON STUCK PIPE. FREE STUCK PIPE. WASH & REAM F/10610~ T/10633~ DRILL AHEAD F/10633~ T/10659~. REAM COAL SEAM @10633~ DRILL F10659~ T/10751~. CIRCULATE & CONDITION HOLE FOR SURVEY. DROP SURVEY @ REPORT TIME. BIT #18 EVALUATION: 5-5-WT-A-E-I-NO-BHA 04/22/90 CIRCULATE/CONDITION HOLE FOR SURVEY. CHECK FOR FLOW. DROP SURVEY. POH T/CSG SHOE & RETRIEVE SURVEY. TIH T/10751~. DRILL F/10751~ T/10905~ W/BIT #19 BHA. CIRC./COND. HOLE. DROP SS SURVEY. POH T/SHOE. RECOVER SURVEY. POH FOR BHA CHANGE. L/D BIT #19 BHA. P/U BIT #20 BHA. TIH & FILL PIPE @ 5550, 9860~ SLIP & CUT DRILL LINE. TIH T/10905~. NO FILL ON BOTTOM. DRILL ~/10905~ T/10910~ (@ REPORT TIME). BIT #19 EVALUATION: 4-4-WT-A-E-1-CT-BHA 04/23/90 DRILL 8.5" HOLE W/BIT #20 ASSEMBLY F/10910~ T/10924~. POH T/CSG SHOE. CIRCULATE HOLE WHILE REPLACING RHEOSTAT ON GEN. 3A ASSIGNMENT SWITCH IN DC PANEL. TIH T/10924~, NO FILL. DRILL AHEAD W/BIT #20 T/11230~ AT REPORT TIME. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 8 04/24/90 DRILL 8.5" HOLE F/11230~ T/11250~. CIRCULATE HOLE FOR SURVEY. DROP SURVEY. POH T/CSG SHOE. RIH W/WL & RETRIEVE SURVEY. SECURE TRIP OPERATIONS. MONITOR WELL. PREPARE TO REPAIR FAULTY DRAWWORK BRAKES. CLEAN BRAKE FLANGES AND CHANGE OUT (BRAKE) BANDS. CLEAN/INSPECT BRAKE SHIFTING SLEEVE & YOKE ASSEMBLY. ALIGN BRAKE SHIFTER SLEEVE. P/U BLOCKS, SECURE DRAWWORKS FOR OPERATION. TIH T/11250~. DRILL AHEAD W/BIT #20 F/11250~ T/11435~. CIRCULATE HOLE & DROP SURVEY. POH. POH 3 STDS & PULL TIGHT @ 11200~. UNABLE TO JAR DOWN, JAR UP OR ROTATE WORK STUCK PIPE, INDICATES DIFFERENTIAL STICKING. MAINTAIN CIRCULATION FREE UP-JARS. CONTINUE JARRING ON STUCK PIPE @ REPORT TIME. WEEKLY DRILL CREW SAFETY MEETING. NOTE: MR. LONNIE SMITH OF AOGCC HAS APPROVED OUR REQUEST TO DEFER THE WEEKLY BOPE TEST THROUGH THIS BIT RUN. 04/25/90 CONTINUE JARRING UP ON FISH @ 11200~. UNABLE TO ROTATE OR JAR DOWN. MAINTAIN CIRCULATION THROUGH FISH. WORK STUCK PIPE. RIH W/WL & RETRIEVE SS SURVEY TOOL. WORK STUCK PIPE. R/U DIALOG. M/U & RIH W/FREE POINT INDICATOR & STRING SHOT ASSEMBLY. UNABLE TO PROCEED BEYOND 10430~ (WLM). POH. M/U PUMP-IN SUB AND RIH W/FREE POINT-STRING SHOT. PUMP DOWN TOOL AND INITIATE FREE POINT LOGGING. LOCATE FREEPOINT BETWEEN DN JAR & UP JAR. WORK DOWN LEFT HAND TORQUE & SHOOT STRING SHOT I JT ABOVE UP-JAR AT 10896~ (WLM). NO BACKOFF OBSERVED. POH W/DIALOG FREE POINT ASSEMBLY. P/U KELLY AND WORK STUCK PIPE. NO BACK OFF. LOST JAR ACTION. R/U DIALOG & RIH W/FREE POINT-lO STRING SHOT ASSEMBLY. LOCATE FREE POINT WORK IN LEFT HAND TORQUE & SHOOT @ 10715~(DPM). OBSERVE BACK OFF. POH W/DIALOG & STAND BACK SAME. POH W/RECOVERED PIPE. L/D SHOT JOINT. RECOVERED ALL "G" & S-135 PIPE, 28 jts OF HWDP. FISH IN HOLE = BIT/BS,LDC,LDC,NMSTB,MC, NMSTB,MC,MC,DC,DC,XOSTB,HWDP,DN JAR,UP JAR,9 HWDP. TOP OF FISH @ 10676~(DPM). P/U FISHING BHA & TIH. BHA @ 6800~ @ REPORT TIME. NOTE: REQUESTED FROM AOGCC WAIVER OF WEEKLY BOPE TEST UNTIL FISHING ACTIVITY IS STABILIZED/SECURED. 04/26/90 TIH W/FISHING BHA. TAG TOP OF FISH @ 10681~ (DPM). P/U PUP JT & KELLY. SCREW INTO & CIRCULATE THROUGH FISH. JAR ON FISH, CONCENTRATING ON DOWN JARRING. R/U & RIH W/DIALOG FP/SS LOCATE FREE POINT @ 10,968 (1 JT ABOVE JARS). FREE POINT TOOL FAILED. POH & CHANGE OUT TOOL. RIH & LOCATE FREE POINT. WORK DOWN LEFT HAND TORQUE. PIPE BACKED OFF MECHANICALLY. POH WIRELINE. P/U KELLY, SCREW INTO FISH. WORK PIPE CONTINUALLY WHILE RIH W/WIRELINE. RIH W/FREE POINT/STRING SHOT. LOCATE FREE POINT @ 10,380, WORK IN LEFT TORQUE. FISHING ASSEMBLY BECAME PROGRESSIVELY DIFFERENTIALLY STUCK AS LEFT HAND TORQUE WAS INDUCED. STOP APPLYING TORQUE. WORK PIPE AND FOUND FISHING JARS STUCK. POH W/WL. WORK STUCK PIPE TO ACTIVATE FISHING JARS. UNABLE TO ACTIVATE FISHING JARS. P/U KELLY & ATTEMPT TO ACTIVATE FISHING JARS. MIX & PUMP 20#/BBL LIQUID CASING SWEEPS TO STABILIZE HOLE. R/U & RIH W/DIALOG FP/SS TOOL. LOCATE FREE PIPE @ 10485~. WORK IN LEFT HAND TORQUE. PIPE BACKED OFF MECHANICALLY @ 10360~ (EST). POH W/FP/SS. POH W/REMAINING ASSEMBLY AT REPORT TIME. FISH IN HOLE: FISH #1BOT @ 11205~ : ~DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 9 BIT #20, B/S, NMLDC, NMLDC, NMSTB, MC, NMSTB, MC, MC, DC, DC, XOSTB, HWDP, DN JAR, UP JAR, FISH #1 TOP @ 10681 8 jts HWDP -- 524~ FISH #2 BOT @ 10681~ : SCREW-IN SUB, BUMPER SUB, OIL JARS, XO SUB, FISH #2 TOP @ 10327~. 11 ea SPIRAL 6.25" DC : 354~ (EST) PULLING OUT OF HOLE WITH FISH AT REPORT TIME. 04/27/90 POOH, RECOVERED 27 HWDP AND 6 DRILL COLLARS. TOP OF FISH AT 10,385. TEST BOPE. LOW TEST ALL VALVES LINES AND RAMS TO 250 PSI. TEST BLIND AND PIPE RAMS TO 5,000 PSI. TEST U/L KELLY SAFETY VALVES, FLOOR VALVE, DART VALVE, INSIDE AND OUTSIDE KILL LINES, HCR AT 250 AND 5,000 PSI. TEST HYDRIL TO 250 AND 3,500 PSI. PERFORMANCE TEST ACCUMULATOR. MAKEUP CLEANOUT ASSEMBLY WITH BIT #18 RR, RIH TO SHOE. SLIP AND CUT 100~ DRILLING LINE RIH TAG TOP OF FISH @ 10,384. CIRCULATE AND CONDITION MUD AND HOLE. POOH. HOLE TIGHT AT 10,300 PICKUP LYNES 7" PERMANENT INFLATABLE BRIDGE PLUG. MAKE UP ON 15 jts. 3 1/2 TUBING. FILL TUBING WITH WATER. RIH WITH PACKER FILLING PIPE AT SURFACE. 04/28/90 RIH WITH LYNES INFLATABLE PACKER ON DRILL PIPE WITH 450~ TUBING STINGER. ATTEMPT TO SET PACKER AT 10,375 (lO'ABOVE TOP OF FISH) FORMATION APPARENTLY WASHED OUT PAST RANGE OF PACKER. MOVED PKR. DOWN TO TOP OF FISH AND ATTEMPTED TO RELEASE, PKR. TURNED. MOVED PKR. UP HOLE 120~ IN ATTEMPT TO PULL INTO SMALLER HOLE AND RELEASE. LOST PRESSURE ON STRING AND ASSUMED PKR. DISENGAGED. PULLED INTO SHOE AND RAN BACK TO TOP OF FISH. NO EVIDENCE OF PKR. CIRCULATE AND CONDITION FOR CEMENT PLUG. PUMP 40 BBL. WATER AHEAD AND MIX 200 SX CLASS G BLENDED W/0.5% CFR 0.25% HOUR-7 SLURRY WT. 16.7 PPG, FOLLOWED BY 3 BBLS WATER. DISPLACED WITH 174 BBLS 11.1 PPG MUD. C.I.P. 12:00 NOON 04/28/90 POOH, LAY DOWN EXCESS DRILL PIPE IN DERRICK. PICKUP BHA FOR DRESSING PLUG. RIH. TAG FIRM CEMENT AT 10,175 POLISH PLUG TO 10,187 (DRILLED AT 1 MIN./FT. W/ 10,000 LBS. WT.) CIRC. AND COND. FOR MOTOR RUN. POOH, CHANGING BHA AT REPORT TIME 04/29/90 PICKUP MUD MOTOR AND ASSOCIATED BHA, ORIENTED MWD. RIH. BREAK CIRCULATION AND SURVEY AT 10,181. CIRCULATE AND CLEAN UP HOLE. KICKING OFF PLUG WITH BIT #21 FROM 10,187~ TO 10,263~ AT REPORT TIME. 04/30/90 DIRECTIONALLY DRILLING WITH MUD MOTOR TO 10,309~. TRIP OUT WITH MOTOR (WET). LAY DOWN MWD AND MOTOR ASSEMBLY./PU ANGLE BUILDING ROTATING ASSEMBLY. TRIP IN HOLE. REAMING MOTOR RUN TO BOTTOM. 05/01/90 DRILLING WITH BIT #22 10,309~-10,462~. RUN WIRELINE SURVEY (INST. DEPTH 10,396~). DRILLING 10,462~-10,772~. AFTER DRILLING "GS" COAL WHILE PICKING UP TO MAKE CONNECTION ABOUT 6~ OFF BOTTOM PIPE TORQUED UP AND STUCK. WORKED FREE AND POOH AT REPORT TIME. 05/02/90 DROP SURVEY AND PREPARE TO PULL BIT #22. POH, CHANGE JARS AND BOTTOM ASSEMBLY. RIH. WASH AND REAM 100~ TO BOTTOM DRILL 10,768~- 10,854~ SHORT TRIP TO CSG. SHOE (25K LESS DRAG THAN LAST TRIP) DRILLING \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 10 05/03/90 DRILLING W/ BIT#23 TO 10,964~ SHORT TRIP TO CSG. SHOE, HOLE IN GOOD CONDITION DRILLING, 10,964~ TO 11,065~ DROP SURVEY TRIP OUT OF HOLE RETRIEVE SURVEY INSTRUMENT CHANGE BOTTOM HOLE ASSEMBLY TEST BOPE, LOW AND HIGH PRESSURE TEST ALL VALVES, LINES, RAMS, AND ASSOCIATED WELL CONTROL EQ., PERFORMANCE TEST ACCUMULATOR. RIH W/BIT #24 BIT GRADING: BIT #21:2 2 WT A F I BT DMF. #22:5 5 BT H F 3 SD PR. #23:4 4 BT HM E I WT HOUR. 05/04/90 RIH W/BIT #24 DRILLING 11,065~-11,277~ SHORT TRIP TO CSG. SHOE. HOLE IN GOOD CONDITION DRILLING TO 11,320~ ENCOUNTER HIGH TORQUE AND REDUCED P RATE. DROP SURVEY. POOH AND CHANGE BHA BIT GRADING: BIT #24: 8 8 RG A F 12 SD TQ. 05/05/90 RIH TO SHOE SLIP AND CUT DRILLING LINE RIH WASH AND REAM 11205~ TO 11348~ DRILLING 11348~ TO 11494~ SHORT TRIP, TIGHT HOLE 11286~, REAM TIGHT SPOTS, RIH DRILLING AT 11590, SWIVEL PACKING FAILED. POOH TO CSG. SHOE FOR REPAIR 05/06/90 RIH AFTER SHORT TRIP TO REPAIR SWIVEL PACKING DRILLING TO 11,687~ DROP SURVEY PULLING AND REAMING UP, WORKING THROUGH KEY SEATS, STARTED PULLING FREE AT 11,200~ LAY DOWN 14 jts. POOH, CHANGE BOTTOM HOLE ASSEMBLY, PICK UP 3 PT. REAMER DRESSED W/ SHARP CUTTERS ON TOP OF BHA. RIH TO 10,948~ REAM 10,948~ TO 11,431~, 11,567~ TO 11,687~ REAM TOTAL 603~ DRILLING WITH BIT #26 BIT #25 GRADING: 8 8 WT A F 8 RG TQ 05/07/90 DRILLING TO 11,772~ SHORT TRIP TO CSG. SHOE, SIGNIFICANT KEYSEATS AT 10,968 & 10,890~ REAM 10,855~ TO 11,029~ RIH DRILL TO TD AT 11,895~ PULL TO CSG. SHOE, KEYSEATS AT 11,432, UP TO 10,515~ REAM 10,486 TO 11,152~ C & C,SPOT FRESH GEL IN OPEN HOLE PRIOR TO POH POH, HOLE APPEARS IN GOOD COND. FOR LOGS 05/08/90 POOH FOR LOGS (SLM, NO CORRECTION) RIG UP ATLAS, RUN GR-AC-DIL, COULD NOT GET TOOLS BELOW 10,920~ WIRELINE KEYSEATING IN HOLE. CHT INDICATED MINIMUM PULL AT TOOLS. RIG UP DIA-LOG AND RUN 9 5/8" CSG. CALIPER FROM 9770~ TO SURFACE. LAY DOWN MONELS AND REPLACE WITH STEEL DC~S. RIH, REAM AND COND. HOLE FROM 10,700~ TO 11,200~ BIT #26 GRADING: 5 4 BT HM E 8 PB TD 05/09/90 C & C, SPOT GEL PILL AT CONCLUSION OF CIRCULATION POH RU ATLAS WIRELINE, RIH W/ GR-DIL, TOOL WOULD NOT GO BELOW 11,040~ POH AND RIG DOWN. RIH WITH DRILLING ASSEMBLY C & C, SPOT GEL PILL PRIOR TO POH. POH FOR ATLAS TCL (TUBING CONVEYED LOG) EQUIPMENT. RIG UP TCL EQUIPMENT 05/10/90 RIG UP ATLAS TCL TOOLS AND RIH TO SHOE ON DRILL PIPE. RIG UP AND REHEAD ATLAS LINE. RIH W/ LINE TO LATCH IN CIRCULATE DRILL PIPE. LATCH IN, TEST TOOLS, CLAMP OFF LINE, AND RIH TO 11,836~ (LOGGING TOOL STRING- SL-CHT-PCM-CN-CDL-DIFL) POOH LOGGING 11,836~ TO 11,560~ TOOL FAILED POH TO CSG SHOE. WIRELINE KNOTTED AND PINCHED, POH TO CHANGE WIRELINE DRUMS. POH WITH DRILL PIPE FOR CLEAN OUT TRIP. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 11 05/11/90 L/D PCL TOOLS. TIH T/CSG SHOE, SLIP & CUT 100~ OF DRILL LINE. TIH T/11845~, CIRC. & CONDITION MUD. SPOT HIGH-VIS PILL IN OPEN HOLE. CHECK FOR FLOW, POH W/CLEAN OUT ASSEMBLY. TEST BOPE: PRESSURE TEST CHOKE MANIFOLD & VALVES @ 250# & 5000#, 5/15 MINUTES WHILE POH. TEST BOPE: TEST VALVES; KILL, U/L KELLY COCK, FLOOR, HCR, INSIDE BOP, @ 250#/5000#, 5/15 MINUTES. TEST PIPE/BLIND RAMS @ 250#/5000#. PERFORMANCE TEST ACCUMULATOR. M/U ATLAS PCL LOG; SL-CHT-PCM-CN-CDL-DIFL. TIH W/PCL LOG TOOLS ON DP TO CSG SHOE. R/U ATLAS WL. CIRCULATE/WASHOVER PIN CONNECT. LATCH ONTO WET CONNECT. OPERATE TOOLS. SPOT PILL IN DP, ADJUST LINE TENSION & CLAMP OFF TO SIDE DOOR SUB. LOGGING DOWN @ REPORT TIME. 05/12/90 TIH & LOG DOWN W/ATLAS PCL (PIPE CONVEYED LOG) SL-CHT-PCM-CN- CDL-DIFLF/CSG SHOE T/11711~ DPM. LOG UP T/CSG SHOE @ 30~/MINUTES. RELEASE CLAMP ON SIDE DOOR SUB, UNSEAT WET CONNECT & POH W/WIRE LINE. POH W/PCL ASSEMBLY ON DRILL PIPE, L/D LOG TOOLS & WIRE LINE. M/U PCL DIP LOG/GR. TIH W/PCL ON DRILL PIPE T/9753~. M/U SIDE DOOR SUB & RIH W/WL. CIRCULATE/WASHOVER PIN CONNECT. LATCH ONTO WET CONNECT & OPERATE TOOLS. SPOT PILL IN DP, ADJUST LINE TENSION & CLAMP OFF TO SIDE DOOR SUB. LOG DOWN W/GR FROM CSG SHOE T/11760~. LOG UP W/DIP LOG/GR F/11760~ T/CSG SHOE. RELEASE TENSION CLAMP ON SIDE DOOR SUB & POH W/WIRE LINE. RIGGING DOWN ATLAS WIRELINE AT REPORT TIME. 05/13/90 POH W/ATLAS PCL TOOLS. L/D DIP LOG/GR. R/D ATLAS WL. P/U & TIH W/BIT #23RR T/CSG SHOE. SLIP & CUT 100~ OF DRILL LINE. TIN T/11895~. WORK TIGHT SPOT AT 11864~. REAM UP TO FREE STRING. CIRCULATE & CONDITION MUD TO RUN 7" LINER. PUMP PILL, PON T/CSG SHOE. BREAK SWIVEL FROM KELLY. LAY DOWN BOTH IN PREPARATION TO RUN LINER. POH W/BIT #23RR BHA. L/D SAME. M/U TIW CEMENT HEAD, FLAG SUB W/TIMKEN SWIVEL ASSEMBLY TO KELLY. STAND BACK & SECURE IN DERRICK. R/U & RUN IN HOLE W/7" LINER. M/U TIW TYPE LG SETTING COLLAR & HYDRO HANGER W/XO TO DP. RABBIT DRILL PIPE GOING IN HOLE. DEPTH OF LINER SHOE AT REPORT TIME IS 4355~. BIT #23RR GRADE: 4-4-BT-A-E-2-LT-TD 05/14/90 RUN 7" LINER ON 5" DRILL PIPE T/9550~. P/U TIW CEMENTING HEAD & SWIVEL ASSEMBLY & M/U TO KELLY, STAND BACK SAME. R/U & TEST T/5000# HOWCO CEMENT LINES. BREAK CIRCULATION, RECIPROCATE & ROTATE PIPE TO ESTABLISH TORQUE & DRAG PARAMETERS. STAND BACK KELLY & CEMENTING HEAD. RUN 7" LINER (SEE DETAIL, PAGE #2) ON DRILL PIPE, RABBIT DP WHILE RIH. LINER STOPPED @ 11737~ (FLOAT SHOE DEPTH). WORK STUCK LINER. P/U KELLY ASSEMBLY. BREAK CIRCULATION. ATTEMPT TO ROTATE LINER, HANGER SPLINE PINS SHEARED PREMATURELY. UNABLE TO ROTATE LINER ON UP-STROKE. UNABLE TO RECIPROCATE LINER. CIRCULATE & CONDITION MUD FOR CEMENT JOB WHILE WORKING STUCK LINER. R/U & TEST @ 5000# CEMENTING LINES. DROP BALL, SET LINER SLIPS W/2700# PRESSURE. CONFIRM RUNNING TOOL WAS RELEASED FROM HANGER ASSEMBLY...CEMENT LINER: PUMP 50 bbls 1% FRESH WATER SPACER, 163 bbls CEMENT SLURRY CONSISTING OF 771SX OF "G" CEMENT, 97 bbls 1% KCL FRESH WATER, 0.4% HALAD-344, 0.3% HOUR-7 , 5.3 g/sk, YIELD OF 1.19 \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 12 cf/sk, @ 15.5# ppg DROP DRILL PIPE WIPER, CHASE WITH 10 Bbls 1% KCL FRESHWATER. DISPLACE CEMENT W/155 bbls OF MUD @ 9 BPM TO SHEAR LINER WIPER PLUG. PUMP 86 bbls OF MUD TO DISPLACE CEMENT FROM LINER & BUMP WIPER @ 2000# CEMENT IN PLACE @ 1915 HOURS, 5/13/90. PULL OUT OF LINER HANGER, POH T/7355~ & REVERSE CIRCULATE 1 DP VOLUME. NO CEMENT RETURNS OBSERVED. SHUT IN WELL WITH 300#. FINAL S.I. PRESSURE @ 120#. POH W/TIW 7" LINER RUNNING TOOL. 7" LINER DETAIL: DEPTH JOINTS LENGTH DESCRIPTION FROM TO 2.04 I 38.00 1.83 I 38.03 0.80 7 267.08 I FLAG 17.94 7 267.59 1 FLAG 19.25 6 228.94 I FLAG 19.37 10 378.96 25 1060.01 15.71 TIW LS SETSHOE 32# P-110 LTC CSG TIW F FLOAT COLLAR 32# P-110 LTC CSG TIW L LANDING COLLAR 32# P-110 LTC CSG 32# P-110 LTC CSG 32# P-110 LTC CSG 32# P-110 LTC CSG 32# P-110 LTC CSG 32# P-110 LTC CSG 32# P-110 LTC CSG 26# L-80 LTC CSG TIW HYDRO HANGER 11737 11735 11735 11697 11697 11695 11695 11657 11657 11656 11656 11389 11389 11371 11371 11103 11103 11084 11084 10855 10855 10836 , 10836 10457 10457 9397 9397 9381 NOTE: 37 SLIP ON CENTRALIZERS WERE RUN IN THE OPEN HOLE SECTION 2 ALUMINUM CENTRALIZERS WERE RUN IN THE LAP SECTION TORQUE STOP RINGS WERE INSTALLED IN THE LTC CONNECTIONS 32# CONNECTIONS WERE TORQUED @ 13,000# 26# CONNECTIONS WERE TORQUED @ 10,000# 05/15/90 POH W/TIW HANGER RUNNING TOOL. BREAK & L/D TIW RUNNING TOOL & CEMENTING HEAD. M/U KELLY SWIVEL ASSEMBLY, SET BORE PROTECTOR. M/U 8.5" BIT #RR23 W/CSG SCRAPER. TIH T/9350~. P/U KELLY, CIRCULATE & TAG TOL @ 9386~. NO CEMENT OBSERVED ABOVE LINER CBU. PULL UP I STD, CLOSE RAMS & TEST LINER LAP @ 3500#. PRESSURE BLED OFF 500# IN 15 MINUTES. RELEASE PRESSURE. CHECK FOR FLOW, PUMP PILL & POH. L/D 38 jts HWDP, 2 HYD. JARS, 9 5/8" SCRAPER & BHA. M/U & TIH W/HOWCO RTTS W/CIRC. VALVE T/9323~. R/U & TEST CEMENT LINES @ 5000#. SET RTTS PACKER @ 9311~ FOR SQUEEZE. CLOSE BYPASS & HYDRIL W/500# ON ANNULUS. ESTABLISH INJECTION RATE @ 2 bpm @ 4650#. OPEN BYPASS. PUMP 25 bbls FW (FRESH WATER) W/1% KCL. FOLLOW W/CEMENT SLURRY CONSISTING OF 100 SX "G" CMT, 12.4 bbls FW, .5% HALAD-344, .2% CFR-3, .08% LWL, 1% KCL. YIELD OF 1.18 cuft/sk, SLURRY DENSITY OF 15.6#/g. CHASE W/5 bbls FW 1% KCL. DISPLACE W/114 bbls MUD TO SPOT LEAD AT RTTS. CLOSE RTTS BYPASS & DISPLACE SLURRY TO LINER LAP W/50 BBLS MUD FOR TOTAL DISPLACEMENT VOL OF 169 bbls. FINAL SLURRY DISPLACEMENT RATE OF 1.66 bpm @ 3500#. FINAL SHUT IN PRESSURE @ 2700#. WAIT ON CEMENT. SLIP & CUT 100~ OF DRILL LINE. REPAIR DRAWWORKS. CHANGE OIL ON SWIVEL & DRAWWORKS. GENERAL RIG MAINT. UNSEAT PACKER, PULL UP 30~ TO REVERSE CIRCULATE AT REPORT TIME. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 13 05/16/90 POH W/RTTS ASSEMBLY. L/D RTTS & 3 its G PIPE. P/U 8.5" BIT #23RR & 9.625" CSG SCRAPER. TIH (SLM) & TAG TOC @ 9320'. DRILL FIRM CEMENT F/9320' T/9386' TOL. CIRCULATE & CLEAN HOLE. PULL UP I STD, CLOSE RAMS. PRESSURE TEST LINER LAP @ 3500# FOR 30 MINUTES. TEST WAS GOOD. PUMP PILL & POH W/CLEAN OUT ASSEMBLY. M/U RTTS PACKER W/HYDROSPRING TESTER & REVERSING SUB. TIH, FILL DP EVERY 5 STDS T/4744' W/9.9# MUD. TIH W/VOIDED DP & SET PACKER @ 9270'. RUN LINER LAP NEGATIVE PRESSURE TEST. PACKER SET 100" ABOVE TOL, TEST W/9.9# MUD FOR UNDERBALANCE OF 2000#+. OPEN DUAL CIP VALVE & MONITOR. CLOSE VALVE & RECORD SHUT IN TEST. FALSE PLATFORM FIRE ALARM. SECURED WELL. ALL HANDS RESPONDED WELL. OPEN VALVE, REVERSE CIRC. DP VOL, RELEASE PACKER. PUMP PILL & POH. POH W/RTTS/HYDROSPRING TESTER @ REPORT TIME. DRILL CREWS HELD SAFETY MEETINGS ON 5/14/90. 05/17/90 POH W/RTTS, HYRDOSPRING ASSEMBLY. L/D SAME. RECOVER/READ CHARTS. GOOD TEST. PULL WEAR RING, TEST 3.5" RAMS @ 250#/5000#, RESET WEAR RING. P/U 5.875" BIT #27, 4.75" DC, 3.5" DP FOR DRILLOUT ASSEMBLY. RABBIT 3.5"DP TIH W/TAPERED STRING ASSEMBLY. TAG & DRILL FIRM CMT F/9383' T/9407'. OBSERVE SMALL AMOUNT CMT IN TOL. TIH. TAG & DRILL CMT @11599'. DRILL LANDING, FLOAT COLLAR, CMT T/11711 CIRCULATE & CONDITION MUD. POH W/BIT #27 ASSEMBLY. M/U & TIH W/BIT #27RR, 7" CSG SCRAPER, 7" STRING MILL ASSEMBLY. SLIP & CUT DRILL LINE. TIH W/CLEAN OUT ASSEMBLY AT REPORT TIME. 05/18/90 TIH WITH (SPACED) 7" SCRAPER & STRING MILL T/11520', CONDITION LINER. CIRCULATE & CONDITION MUD FOR LOGS. PULL UP I std, CLOSE RAMS & PRESSURE TEST CSG @ 3500# FOR 30 MINUTES. OK POH W/BIT $ 27RR BHA. PULL PITCHER NIPPLE, INSTALL SHOOTING FLANGE & LUBRICATOR ON HYDRIL. R/U ATLAS WL, PRESS. TEST LUBRICATOR @ 2500#. RIH W/SBT/GR/CCL T/11674 PRESSURE WELLBORE T/lO00#, LOG F/11674' T/8950' W/SBT/GR/CCL. POH/LD TEST BOPE SURFACE SYSTEM WHILE LOGGING. (CHOKE MANIF/VALVES/FLR VALVE) R/U GYRODATA GYRO SURVEY TOOL, SURVEY F/11692' T/SURFACE. R/D ATLAS WL PULL SHOOTING FLANGE, INSTALL PITCHER NIPPLE. TESTING STACK BOPE & ACCUMULATOR SYSTEM AT REPORT TIME. 05/19/90 TEST BOPE: PULL BORE PROTECTOR, TEST PIPE, BLIND, HCR, MANUAL. CHOKE LINE, KILL, SAFETY, KELLY, & INSIDE BOP VALVES @ 250#/5000#. TEST ANNULAR PREVENTER @ 250#/3500#. PERFORMANCE TEST ACCUMULATOR SYST. SET BORE PROTECTOR, P/U & TIH W/BIT #27RR & SPACED 7" CSG SCRAPER AND STRING MILL T/11711'. CIRC. & COND. MUD. PUMP PILL. POH & L/D DRILL STRING. R/U & RIH W/3.5" 9.3# N-80 TBG WORK STRING. 05/20/90 P/U, RABBIT (2.8"), & RIH W/3.5" 9.3# N-80 TBG WORKSTRING. ALTERNATE MUD FLOW DIRECTION AT HIGH RATE TO REMOVE LOOSE RUST/SCALE/PIPE DOPE FROM TUBING. R/U TO DISPLACE MUD. PUMP HIGH VIS. HEC SWEEP AHEAD AND CHASE WITH 8.5# FIW (FILTERED INLET WATER) UNTIL RETURNS INDICATED <60 TSS ON TURBIDITY METER. CLOSE SYSTEM. CLEAN MUD PITS, FLOWLINE, SHAKERS, FLUSH ALL MUD LINES W/FIW. R/U & PRIME DE FILTER SYSTEM. CIRCULATE & \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 14 FILTER WATER THROUGH DE FILTER SYSTEM W/2 MICRON DISCHARGE FILTERS TO OBTAIN <60 TSS. CONTINUE FILTERING UNTIL "DIRTY" SPOTS IN SYSTEM ARE REMOVED. NOTE: PULLED END OF WELL MUD SAMPLE. 05/21/90 CONTINUE CIRCULATING FIW THROUGH DE FILTRATION SYSTEM & 2 MICRON CARTRIDGE FILTERS. FINAL WATER QUALITY @ 37 TSS. CLEAN PITS, MIX & SPOT 15 bbl 3% KCL FIW PILL ACROSS PERFS. P/U 2 7/8" PRODUCTION TUBING & STANDBACK IN DERRICK WHILE CIRCULATING. POH W/3.5" 9.3# TUBING WORKSTRING. M/U HALLIBURTON RES. SERV. SURFACE EQUIPMENT & TEST HEAD W/WIRELINE XO STANDBACK SAME. M/U VANN SERVICES TUBING CONVEYED PERFORATING BHA W/HOURS CHAMP III PKR, HOURS OMNI CYCLING TOOL, & 12 ea. 4.75" DRILL COLLARS. TIH W/VANN/HOURS BHA ON 3.5" WORKSTRING. STOP & FILL TUBING EVERY 5 STDS FILL PIPE TO 4374~ OF WATER CUSHION FOR A CALCULATED UNDERBALANCE OF 2500# AND 1600# HYDROSTATIC REMAINING ON FORMATION UPON OPENING OMNI. CONTINUE TIH W/O FILLING TUBING, GUN DEPTH @ 10100~, REPORT TIME. NOTE: HELD SAFETY/ORGANIZATIONAL MEETING WITH ALL DRILL HANDS ON TOUR REGARDING VANN PERFORATING GUN HANDLING SAFETY & RUNNING OPNS. PRIMARY PERFORATING DATA: GUNS LOADED @ 4 SPF W/90d PHASING. TOP SHOT PROGNOSED @ 11564~, BOTTOM SHOT @ 11668~. FIRING ASSEMBLY SET FOR ANNULAR PRESSURE OR MECHANICAL BAR DROP. 05/22/90 TIH W/VANN TBG CONVEYED GUNS & HALLIBURTON RESERVOIR SERVICES (HOURS) BHA T/11564~(DPM) TOP SHOT LOCATION. RABBIT ALL'STANDS WHILE TIH. R/U & RIH W/ATLAS WL GR/CCL FOR TIE-IN W/RA MARKER DEPTH. LOWER STRING 12~ TO LOCATE TOP SHOT @ 11564~ (WL DEPTH IS 12~ LOWER THAN DP SLM DEPTH). R/D ATLAS WL. R/U & TEST HOURS TEST HEAD & MANIFOLD @ 3500#. UNABLE TO SET HOWCO CHAMP III PACKER @11516~. POH 7 STDS, ATTEMPT TO SET PACKER. POH TOTAL OF 14 STDS INTO 26# CSG. SET PACKER. TIH, WORK & SET PACKER @ 11516~. R/U HOURS TEST MANIFOLD/FLUID LEVEL EQ. PRESSURE UP ON ANNULUS 1500# TO CYCLE OMNI VALVE & OPEN LPR-N VALVE. SHOOT BASELINE FLUID LEVEL SURVEY. PRESSURE UP ON ANNULUS 3500# TO FIRE VANN GUNS. NO SIGNIFICANT INDICATION OF GUNS FIRING WAS OBSERVED. FLUID LEVEL SURVEY DID NOT INDICATE INFLOW. CYCLE OMNI & LPR-N VALVES, SURGE PRESSURE ON ANNULUS IN ATTEMPT TO FIRE GUNS. COULD NOT CONFIRM OMNI/LPR-N VALVES OPEN, THEREFORE DID NOT DROP FIRING BAR. R/U & RIH W/SLICKLINE WT BAR/JARS/VANN FIRING BAR TO CONFIRM OMNI/ LPR-N VALVES OPEN & TO MECHANICALLY FIRE GUNS. AT 600~ FROM FIRING HEAD, THE LOWER SLICKLINE SHEAVE BROKE LOOSE & NICKED SLICKLINE. POH W/SLICKLINE TO AVOID LOSING LINE IN TUBING. SHOOT FLUID LEVEL. MINOR INDICATIONS OF FLUID RISE IN TBG SUGGESTED POSSIBLE GUN FIRING. CYCLE OMNI VALVE TO CIRCULATING MODE. REVERSE CIRCULATE 8.9# FILTERED KILL BRINE. CONTINUE CIRCULATING 8.9# BRINE TO REDUCE WATER QUALITY TURBIDITY <60 TSS. CHECK WELL FOR FLOW, R/D HOURS TEST HEAD & MANIFOLD, UNSEAT CHAMP III PACKER. CHECK FOR FLOW. POH W/VANN GUN/HOURS TEST BHA. NOTE: DOWELL-SCHLUMBERGER FRAC EQUIPMENT & MATERIALS ARE ONBOARD AND STANDING BY FOR FRAC JOB. PROTECTOR. L/D BHA IN DERRICK, L/D 17 1/2" STABS AND KICKOFF ASSEMBLY, P/U DRILL ASSEMBLY, M/U BIT #4 RIH WITH DRILLING ASSEMBLY. TAG ~DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 15 CEMENT @ 1330', DRILL CMT, DRILL FLOAT COLLAR @ 1348~ AND SHOE @ 1389~ DRILL OUT OF 13 3/8" CSG @ 2300 HOURS 03/21/90. DRILL 12 1/4" HOLE F/1389~ T/1400~, CHANGE OVER TO MUD. PERFORM LEAK OFF TEST @ 1400~, BREAK DOWN @ 315 PSI, 13.4 PPG EQUIV. DRILL AND SURVEY 12 1/4" HOLE F/1400~ T/1685~. 05/23/90 POH W/VANN GUN/HRS TEST BHA. L/D HRS TEST TOOLS. VANN PERFORATING GUNS DID NOT FIRE. NOTE: THE FIRING HEAD & BOOSTER/IGNITER APPEAR TO HAVE BEEN ACTUATED ON THE TOP VANN GUN. THE FAILURE WAS APPARENTLY DUE TO THE PRIMA-CORD INCOMPLETE BURN. RELOADING VANN GUNS. HALLIBURTON RESERVOIR SERVICE (HRS) DISASSEMBLED THE OMNI & LPR-N ROTATIONAL VALVES. THE ASSEMBLIES WERE PACKED WITH TUBING SCALE MATERIAL. THE DRAIN VALVE ON THE VANN BHA APPEARS TO HAVE SCALE BUILD UP @ PORTS. EXCESSIVE SCALE MAY COMPROMISE THE OPERATION OF THE BHA TEST TOOLS AND OPTION OF DROPPING FIRE BAR. RIH W/MULE SHOE ON 3.5" TUBING TO 11261~. RABBIT EACH STAND FOR SCALE REMOVAL. R/U TO SPOT ACID IN TUBING FOR SCALE REMOVAL. HOLD SAFETY MEETING WITH DRILL CREW. TEST LINES @1000#. PUMP 46 bbls OF 15% HCL W/.2% INHIBITOR TO END OF TUBING. SHUT IN, ACID IN PLACE ( F/11261~ T/5630) FOR 90 min REVERSE CIRCULATE 46 bbls &.,SPOT ACID F/5630~ T/RKB, ACID IN PLACE FOR 90 mins. DISPLACE ACID RETURNS TO DOWELL-SCHLUMBERGER 2000 g TANK, DILUTE WITH FRESHWATER, NEUTRALIZE WITH SODA ASH & SSII (H2S SCAVENGER). TRANSFER 128 bbls OF NEUTRALIZED/DILUTED HCL TO PRODUCTION SYSTEM. WASH OUT & R/D ACID LINES. REVERSE CIRCULATE TUBING. MONITOR RETURNS FOR LIGHT SPOTS. FILTER 8.9# BRINE THROUGH DE FILTERS FOR <60 WATER QUALITY. PREPARE TO POH @ REPORT TIME. 05/24/90 REVERSE CIRCULATE TUBING TO CLEAR OF SCALE EMULSION FROM ACID JOB. POH W/3.5" WORKSTRING. P/U VANN TUBING CONVEYED PERF. GUN ASSEMBLY W/HALLIBURTON RESERVOIR SERVICE BHA TESTING TOOLS. (SEE PERFORATING DETAIL BELOW). TIH W/PERFORATING BHA. STOP FILLING PIPE WITH WATER AFTER 42 STDS. FOR APPROXIMATE UNDERBALANCE OF 2600#. CONTINUE TIH & SET R/A MARKER AT 11261~ DRILL PIPE MEAS. R/U & RIH W/ATLAS WIRELINE GR/CCL. TIE IN WITH CASED HOLE GR & SPACE R/A MARKER. POH & L/D ATLAS WIRELINE. R/U & TEST HRS TEST MANIFOLD AND HEAD ASSEMBLY. @ 3500#. SHOOT FLUID LEVEL LOCATED AT 7380~ (4096~ WATER FROM F/LPR-N). PRESSURE ON ANNULUS T/950# & OPEN LPR-N, CONTINUE PRESSURING UP T/3000 PERFORATING GUNS FIRED. RUN HRS FLUID LEVEL INFLOW SURVEYS FOR 1 HOUR. CYCLE OMNI VALVE TO CIRCULATE MODE. REVERSE CIRCULATE INFLOW FLUID TO SURFACE, MONITOR FOR SAMPLES.,OIL IN BRINE RETURNS OBSERVED & SAMPLED. FLUID ROSE 312~ IN 58 min. RELEASE PACKER. REVERSE CIRCULATE TUBING VOLUME. R/D TEST HEAD & MANIFOLD. POH W/VANN GUN BHA (SLOW IN 7" TO AVOID SWABBING IN 7"). LAYING DOWN BHA AT REPORT TIME. PERFORATING DATA: TOP SHOT @ 11564~ BOTTOM SHOT @ 11668~. 4 SPF, 32 GRAMS/SHOT, 90d PHASING, 375 HOLES (EST) SHOT. ~DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 16 FLUID LEVEL DATA: CASING PRESSURE @ 3200#. FL @ 7380~ 20:57 OPEN LPR-N FLD LEVEL @ 7287~ 21:02 FIRE GUNS, FLD LEVEL @ 21:05 7287~ 20:55 FLD LEVEL @ 7103~ 20:15 FLD LEVEL @ 7241~ 20:60 FLD LEVEL @ 7072~ 20:25 FLD LEVEL @ 7180~ SUMMARY- 312~ RISE @ 58 min. 20:35 FLD LEVEL @ 7149~ 20:45 FLD LEVEL @ 7134~ 05/25/90 FINISHED POH/LAY DOWN VANN GUNS/BHA. CHANGED VARIABLE RAMS TO SOLID 3.5" PIPE RAMS FOR FRAC JOB. TEST OK. RAN 7" RTTS PKR/CIRC. VALVE W/MULE SHOE ON A 6~ PUP JT. EOT AT 10477~. CIRC. 110 BBLS 8.9 PPG BRINE DOWN TBG TO CLEAN IT OUT AFTER TRIPPING. SET PKR, CLOSED PIPE RAMS JUST ABOVE DP TOOL JT. TEST BACKSIDE T/3500# HELD PRE-JOB SAFETY/OPERATIONS MEETING WITH ALL INVOLVED PERSONNEL. RIG DOWELL LINES T/FLOOR; TEST AT 11500, OK. TEST AT 6000 F/5 MINS OK. MINI-FRAC; 40 BBLS/15 BBLS MIN, 9800 PSI. ISIP 6200, 5 MIN 3461 THEN, 80 BBLS/15 BBLS MIN, 9599 PSI. ISIP 6850, 5 MIN 5548, 30 MIN 3119, THEN 100 BBLS/20 BBLS MIN, 9500 PSI. ISIP 6750, 5 MINS 5470, 72 MIN 2792 RE-OPEN FRACTURE; 15 BBLS AT 1.7 BBLS 6468 PSI. 5 MIN 4665 32 MIN 2792 15 BBLS AT 1.4 BBL/MIN 6345 PSI. 5 MIN 4706 30 MIN 2797. MIX UP 250 BBLS OF PRE-PAD. (WF-20) REFUEL TURBINES. HELD SAFETY MEET. FRAC WELL; W/8# AT PERFS AND 10# GOING DOWN HAD SCREEN OUT. GOT 34308 POUNDS OF PROPPANT IN FORMATION. 22100# LEFT IN THE TBG. MONITOR PRESSURE'S. 05/26/90 MONITOR WELL: HOURLY PSI READINGS. 1360 PSI AT 0430 HRS THIS DATE. HAS BEEN DROPPING 40 TO 60 PSI PER HOUR. DC PANEL: REMOVING OLD WIRES AT THIS TIME. BEST ESTIMATE FOR COMPLETION 7-9 DAYS. HAVE 5 ELECTRICIANS ON THE PROJECT, 2 WORKING NIGHTS AND 3 WORKING DAYS. THERE ISN'T ROOM FOR ANY MORE HELP THAN THIS AT THE PANEL. 05/27/90 MONITOR WELL: HOURLY PSI READINGS. 360 PSI AT 0500 THIS DATE. DROPPING AT 20 PSI/HOUR AT THIS TIME. 05/28/90 MONITOR WELL: HOURLY PSI READINGS. WELL PRESSURE STAYING AT 200 TO 220 PSI AS OF 1000 HRS 05/27/90. 05/29/90 MONITOR WELL: READINGS EACH 4 HRS. AT 180 PSI SINCE NOON 05/28/90. 05/30/90 MONITOR WELL: TBG PSI 170#. DC PANEL: CONTINUE INSTALLING NEW WIRE. RIG: PREPARING TO PICK UP AND STAND BACK IN THE DERRICK THE 2.875" COMPLETION TBG. (WILL USE AIR TUGGERS/MOUSE HOLE TO DO THIS) 05/31/90 TBG PSI AT ZERO. DC PANEL: CONTINUE INSTALLING NEW WIRING. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 17 TERMINATE AC CONTACTORS. RIG' PICKED UP 324 JTS 2.875" TBG AND STOOD BACK IN DERRICK. CLEANING/PAINTING IN PUMP ROOM/CELLAR. WELDERS FAB/INSTALLED HANDRAILS AROUND TOP OF DOG HOUSE. (REPLACED POST/CHAIN STYLE RAILING) 06/01/90 TBG PSI AT ZERO. DC PANEL' CONTINUE WIRING TO CONTACTORS AND RELAYS. 900601 RIG' INSTALLED DRUM LINERS IN 55 GAL DRUMS IN PREPARATION FOR REMOVAL OF FRAC SAND FROM FRAC STRING. 06/02/90 TBG PSI AT ZERO. DC PANEL' CONTINUE WIRING TO CONTACTORS AND RELAYS. RIG: INSPECTED THE DERRICK AND SUB-STRUCTURE. REPAIRED BENT HAND RAIL AT THE RUN-AROUND, REPLACED A FEW MISSING KEEPER PINS. ALL ELSE WAS FOUND TO BE IN GOOD ORDER. 06/03/90 TBG PSI AT ZERO. DC PANEL' CONTINUE WIRING TO CONTACTORS AND RELAYS. 06/04/90 TBG PSI ZERO. DC PANEL: FINISHED WIRING TO CONTACTORS AND RELAYS. PUT 140 VOLT DC POWER TO PANEL. TEST ALL CONTROL CIRCUITS/ASSIGNMENTS AT RIG FLOOR AND MUD PITS. START ENGINES/DC GENERATORS. TEST ALL BLOWER MOTORS FOR PROPER ROTATION. TEST ALL TRACTION MOTORS FOR PROPER ROTATION. ADJUST RPMS ON ENGINES. SETTING VOLTAGES/AMPS, UNDER LOAD, FINAL ADJUSTMENTS TO RHEOSTATS THIS MORNING. RIG: RIG UP 3" CHICKSAN TO CHOKE MANIFOLD TO REVERSE OUT FRAC PROPPANT FROM TBG. 06/05/90 CHECK OUT ASSIGNMENTS; A-B MOTORS/GENS, ADJUST LOAD SHARING AS NEEDED. OPEN BYPASS ABOVE RTTS. PRESSURE UP T/3500 PSI IN ATTEMPT TO REVERSE OUT FRAC SAND FROM TBG. NO SUCCESS. CONTINUE TRYING WHILE MOBILIZING ARCTIC RECOIL CO.~S COILED TBG UNIT (CTU) RIG UP CTU USING 1.5" COILED TBG. (W/MULE SHOE ON END) HELD SAFETY MEETING W/ALL INVOLVED PERSONNEL; RIG CREW, CRANE CREW & CTU HANDS. PRIME UP CTU. TEST LINES/HEAD T/lO00 PSI. OK. RUN IN HOLE T/865~. CIRC. OUT CROSS LINKED GEL/SAND. (5 DRUMS OF IT) BEGAN STAGING IN HOLE. RUN IN 200~ THEN CIRC. 15 MINS AT EACH 200~ INTERVAL. AT 3800~ CIRC. UNTIL TBG WAS CLEAN. (30 MINS) CONTINUE STAGING IN THE HOLE AS ABOVE AT REPORT TIME. HAVE RECOVERED 2 MORE DRUMS OF SAND FROM 865~ TO 3800~. THIS SAND DID NOT HAVE ANY X-LINKED 900605 GEL INTRAINED WITH IT. NOTE: PUMP RATE IS 1.5 BBLS/MIN AT 4200 PSI THRU CTU. FRAC STRING TBG IS 3.5" 8RD AB MOD L-80 9.3#/FT. 06/06/90 CONTINUE STAGING IN BY 200~ INTERVALS TO 6000~. CIRC. HOLE CLEAN. RAN IN HOLE, WITH PUMP OFF, TO 7490~. TAGGED UP SOLID ON SAND. START PUMP AT 1.5 BBLS/MIN, 4000 PSI AND STAGING IN BY 100~ INTERVALS WITH 15 MIN CIRC. TIME BETWEEN, DOWN TO 8000~. ATTEMPT TO REVERSE CIRC. W/RIG PUMPS. NO SUCCESS. CONTINUE STAGING IN HOLE T/11000~ AS ABOVE. CIRC. HOLE CLEAN AT REPORT TIME. PREPARATORY TO ANOTHER ATTEMPT AT REVERSING OUT WITH RIG PUMP. (BYPASS IS OPEN AT 11458~) HAVE BEEN MAINTAINING 200-300 PSI ON ANNULUS DURING OPERATIONS. NOTE: HAVE RECOVERED A TOTAL OF 30 DRUMS OF SAND. APPROXIMATELY. 42 GALS IS PUT IN EACH DRUM. ~DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 18 06/07/90 FINISH CIRC. HOLE CLEAN W/CTU. REVERSE CIRC. OUT REMAINING SAND THRU BYPASS AND AROUND RTTS FROM EOT AT 11460'. RECOVERED 1.75 DRUMS OF SAND. 2 BBL/MIN RATE AT 700 PSI W/RIG PUMP AND CTU PULLING OUT OF THE HOLE PUMPING AT .25 BBL/MIN. CIRC. HOLE UNTIL CLEAN. SHUT IN WELL. RIG DOWN CTU. CHECK F/FLOW, NONE. PUMPED 10 SX SALT PILL FOR DRY JOB. POH, LAYED DOWN RTTS. (HOWCO HAND WILL RE-DRESSED RTTS FOR NEXT FRAC) DID WEEKLY BOPE TEST. MAKE UP 3.5" MULE SHOE ON EOT. TIH. TAGGED SAND AT 11460'. REVERSE OUT SAND T/11560 (DIL) 11569'*TBG MEASUREMENT. RECOVERED 2.5 DRUMS OF SAND. TOTAL RECOVERED SAND FROM THIS FRAC IS 35 DRUMS. CHECK F/FLOW, NONE. PUMPED DRY JOB. POH W/MULE SHOE AT RPT TIME. NOTE:*THERE IS 9' DIFFERENCE BETWEEN DIL AND TBG MEASUREMENT AS NOTED ABOVE, TBG MUST BE 9' DEEPER TO BE AT DIL MEASUREMENT. 06/08/90 POH W/3.5" TUBING WORKSTRING. P/U & TIH W/HOWCO 7"X32# MODEL "N QUICK" RETRIEVABLE BRIDGE PLUG. SET RBP @ 11554' DPM (TOP OF SPEAR). RELEASE FROM RUNNING TOOL & STAND BACK KELLY. PULL UP T/11510' & CLOSE RAMS. TEST RBP @ 3500# FOR 30 mins. GOOD. SPOT 500# OF 20/40 MESH SAND ON TOP OF RBP. TAG TOP OF SAND @ 11533'. REVERSE CIRCULATE 1.5 X TBG VOL. TAG SAND @ 11533' DPM. R/U & PUMP 162 bbls OF 8.8# BRINE COMPLETION FLUID TO PRODUCTION TO EMPTY MUD PITS. CLEAN MUD PITS & R/U FEEDWATER SUPPLY LINE FROM WATER INJECTION HEADER. WATER QUALITY = <5 MICRON, WATER INJECTION QUALITY DOWNSTREAM OF CUNO FILTERS. FILL PITS W/8.5# FIW AND DISPLACE WELL COMPLETION FLUIDS TO PRODUCTION CONTINUE DISPLACING AT REPORT TIME. 06/09/90 DISPLACE 8.8# WELL COMPLETION FLUID W/8.5# FILTERED INLET WATER FROM WATERFLOOD INJECTION HEADER. WATER QUALITY <3 MICRON, FINAL TURBIDITY VALUE @ 35 TSS. TRANSFERRED GROSS TOTAL VOLUME OF 1020 bbls 8.8# BRINE TO PRODUCTION HEADER. ONSHORE OPERATOR TOOK EFFLUENT SAMPLE AS REQUIRE TAG TOP OF SAND @ 11533'. POH W/HOWCO RBP RUNNING TOOL. CONDUCT SAFETY MEETING OF ALL PERSONNEL INVOLVED IN THE ASSEMBLY OF VANN TUBING CONVEYED PERFORATING GUNS. ASSEMBLE VANN PERFORATING GUN BHA, 3 STDS 4.75" DC, HRS CHAMP III PKR, HRS OMNI & LPR-N VALVES PER PROG. TIH W/VANN/HRS BHA ON 3.5" WORKSTRING. RABBIT TBG, FILL W/8.5# FIW EVERY 5 stds TO 4300' OF TBG. CALCULATED UNDERBALANCE OF 2500# W/1600# ON FORMATION AT TIME OF PERFORATION. WORK CHAMP III PACKER THROUGH TOP OF LINER. M/U HRS TEST HEAD & TIH T/11520' DPM. R/U ATLAS WL & RIH W/GR/CCL FOR CORRELATION W/DIL. CONFIRM DPM IS 9' DEEPER THAN DIL. RA SPACED @ 11142' DPM, PLACING TOP SHOT @ 11425' DPM (11416' DIL), BOTTOM .SHOT @ 1151g' DPM (11510' DIL). POH, R/D ATLAS WL SET HOWCO CHAMP III PACKER. PRESSURE TEST ALL SURFACE TEST PIPING & MANIFOLD T/3500#. GOOD. RUNNING BASELINE FLUID LEVEL SURVEY IN PREPARATION TO PERFORATE @ REPORT TIME. 06/10/90 RUN BASELINE FLUID LEVEL SURVEY PRIOR TO OPENING LPR-N. FL @ 7073'. CYCLE OPEN LPR-N & OMNI VALVES. PRESSURE ANNULUS TO 2200#, GUNS FIRED @ 0630 hrs. PERFORATE HN-HR INTERVAL F/11510' ~DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 19 (DIL) T/11416~ (DIL). GUNS LOADED @ 4 JSPF, 90d PHASE, RDX, 32 GMDP CHARGE; 340 HOLES FLUID LEVEL DATA: TIME FLUID LEVEL 06:25 - GUNS FIRED 06:30 - 6734~ 06:35 - 6642~ 06:40 - 6550~ 06:45 - 6458~ 06:50 - 6381~ 06:55 - 6304~ 07:00 - 6227~ 07:05 - 6150~ 07:10 - 6081~ 07:15 - 6004~ 07:20 - 5927~ 07:25 - 5850~ SUMMARY: 1223~ IN 1 hr. CYCLE OMNI VALVE & REVERSE CIRCULATE FORMATION FLUIDS TO PRODUCTION. UNSEAT PACKER, REVERSE CIRCULATE 8.5# COMPLETION BRINE & FLUIDS TO PRODUCTION. CHECK FOR FLOW. WELL STABLE. 155 bbls OF COMPLETION FLUIDS PUMPED TO PRODUCTION. MONITOR WELL. R/D TEST MANIFOLD & PIPING. POH W/VANN/HRS TEST BHA. L/D VANN & HRS BHA. OBSERVE 2 PACKER RUBBERS LEFT IN HOLE. P/U HOWCO RTTS PACKER & FRAC BHA. M/U & TIH W/3.5" 9.3# N-80 EUE ABMOD TUBING FRAC STRING. SPACE W/S-135 DRILL PIPE BELOW RAMS. UNABLE TO SET RTTS PACKER. RELOCATE & WORK PACKER. CONTINUE EFFORTS TO SET PACKER AT REPORT TIME. 06/11/90 CONTINUE EFFORTS TO SET RTTS PACKER. PULL OUT OF HOLE 5 stds, SET PACKER. RELEASE PACKER. RIH T/11310~. UNABLE TO SET PACKER. PULL UP 60~. SPACE PUP JOINTS BELOW PIPE RAMS, SET PACKER @ 11243~. CLOSE PIPE RAMS & PRESSURE TEST ANNULUS @ 3500#. R/U DOWELL-SCHLUMBERGER & GEL UP TANKS. CONDUCT PRE-JOB SAFETY & ORGANIZATIONAL MEETING WITH ALL PERSONNEL. PRESSURE ANNULUS T/3500#, PRESSURE TEST ALL FRAC (INJ) LINES @ 11000#. INITIATE DATA FRAC: STAGE 1: PUMP 40 bbls WF220 @ 15 BPM. NO BREAKDOWN OBSERVED. S/D PUMPS ISIP : 4250#. PRESSURE FELL OFF TO 1640# IN 12 mins. STAGE 2: PUMP 80 bbls OF WF220 @ 15 BPM. ISIP = 5685#. PRESSURE FELL OFF TO 2870# IN 12 mins. STAGE 3: PUMP 100 bbls WF220 @ 20 GPM. ISIP : 5800#. PRESSURE FELL OFF TO 2653# IN 43 mins. REOPEN FRACTURE TWICE @ 1.5 BPM W/PRESSURE FALL OFF BETWEEN PUMPING. REPAIR LEAK ON D-S HIGH PRESSURE PUMP FLUID END. REFUEL TURBINES. PRIME UP 2 OF 5 TURBINES. INITIATE FRACTURE TREATMENT: STAGE RATE VOL VOL (BPM) (DIRTY) (CLEAN) PAD 15 577 577 8266 2# 15 16 593 8220 4# 15 32 625 8109 6# 15 37 662 7506 8# 15 40 702 7145 10# 15 138 840 7205 FLUSH 15 86* 926 11000* TREATING PRESSURE * REQUIRED FLUSH VOLUME WAS 102 bbls. TREATMENT SCREENED OUT @ 85% (16 bbls SHORT) OF FLUSH VOLUME. TOTAL TREATMENT INCLUDED 866 bbls YF240 AND 54,000 lbs OF 20-40 ISP IN FORMATION. ESTIMATE 6500 lbs ISP IN WELLBORE. TOTAL FLUID LOAD TO RECOVER \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 20 IS (EST) 1,116 bbls. SHUT IN WELL & MONITOR TUBING/CASING DATE TIME TBG PRESSURE 6\10 1930 10280# 2000 9666# 2030 8781# 2100 6866# 2130 5722# 2200 5250# 2230 4827# 2300 3400# 2330 3350# 2400 3260# 6\11 0030 3200# 0100 3120# 0200 3000# 0300 3010# 0400 3050# 0500 2960# PRESSURE. INITIAL SHUT- IN PREPARE TO FLOW BACK WELL AT REPORT TIME. NOTE: 194 bbls OF FRAC GEL (SURFACE MIX) SURPLUS TRANSFERRED TO PRODUCTION. MAINTENANCE: WORKING ON #2 MUD PUMP, REBUILDING CROSSHEADS & LINERS 06/12/90 MONITOR SHUT IN WELL FOR CLOSURE. FINAL SHUT-IN PRESSURE @ 2930#. BLEED OFF TUBING PRESSURE. FLOWBACK WELL, MONITOR VALUES. INITIAL FLOW RATE : 6.5 BPH, PEAK @ 45. END @ 2.5 B/H. FLOW BACK MTRL CONSISTED OF GEL,OIL,X-LINKED GEL & GAS. NO SAND RECOVERED. 116 bbls GROSS PRODUCED VOLUME. OIL/WATER CUT @ 22% SHUT-IN WELL FOR PRESSURE BUILD UP. FINAL PRESSURE WAS 175# (TBG). BLEED OFF TUBING, OPEN PIPE RAMS & PICK UP ON TUBING TO RELEASE RTTS. CLOSE RAMS, REVERSE CIRCULATE FLUID BELOW PACKER & TUBING VOLUME THROUGH CHOKE, GAS BUSTER & ACROSS SCREENS. NO SAND RECOVERED. S/I WELL & OBSERVE TBG/CSG PRESSURE. 300# ON CSG, O# ON TBG. SUSPECT SAND BRIDGED IN TBG. REVERSE CIRCULATE TWO TIMES TUBING VOLUME. RECOVER 1/2 bbl SAND "SLUG" S/I WELL & MONITOR TBG/CSG FOR KILL WEIGHT FLUID CALCULATIONS. CLEANING MUD PITS FOR BRINE WEIGHT INCREASE AT REPORT TIME. NOTE: TRANSFERRED 230 bbls OF FRAC/COMPLETION FLUIDS TO PRODUCTION. MAINTENANCE: REBUILDING OF CROSSHEADS, LINERS & CYLINDERS ON MUD PUMP #1 COMPLETED. TESTED & PUT ON LINE. BEGIN REPAIRS ON MUD PUMP #2. 06/13/90 MONITOR S/I WELL. CLEAN PITS, BUILD 9.5# KILL BRINE WITH FIW. CIRCULATE 9.5# KILL FLUID TO STABILIZE WELL. MONITOR WELL, NO FLOW. CLEAR RIG FLOOR, CHECK FOR FLOW, PUMP SALT PILL. POH W/FRAC RTTS PACKER BHA. P/U & TIH W/MULE SHOE ON 3.5" TBG WORKSTRING. TAG TOP OF SAND @ 11260~ REVERSE CIRCULATE TO CLEAN OUT FRAC SAND F/11260~ T/11429~. RECOVERED 8 DRUMS OF FRAC SAND. POH W/MULE SHOE BHA @ REPORT TIME. OTHER:-REBUILDING CROSSHEADS, LINERS & CYLINDERS ON MUD PUMP #2.-TRANSFERRED 576 bbls (GROSS VOL.) OF 8.5# COMPLETION FLUIDS TO PRODUCTION. -STATUS REPORT OF MGS C-LINE WELL: INJECTED 574 bbls OF~,FIW \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 21 THROUGH TUBING FOR DISPLACEMENT OF POSSIBLE H2S TAINTED"FLUIDS. ENDING PRESSURES AFTER INJECTION; 1050# TBG. 960# ANNULUS. 06/14/90 POH W/MULE SHOE ON 3.5" 9.3# TBG. WORKSTRING. P/U & TIH W/HOWCO RETRIEVABLE BRIDGE PLUG, SET @ 11409~ DPM, 11400~DIL RELEASE RUNNING TOOL FROM RPB, CLOSE PIPE RAMS, PRESSURE TEST @ 3500#. DUMP 300#~S OF 20-40 MESH SAND IN TBG. DISPLACE TO EOT. SPOT & SETTLE. TAG TOP OF SAND @ 11401~ DPM. REVERSE CIRCULATE COMPLETION FLUID & FILTER W/BAKER DE SYSTEM TO OBTAIN WATER QUALITY OF 37 TSS USING 2 MICRON FINAL STAGE FILTERS. CHECK WELL FOR FLOW, POH W/HOWCO RBP RUNNING TOOL. M/U & TIH W/VANN/HRS PERFORATING/TESTING BHA. GUNS LOADED TO PERFORATE FOLLOWING INTERVALS OF HK-HN & HI-HK, 11190-11236~ & 11280~-11358~ (DIL MEAS). THERE IS 288.3~ FROM R/A PILL TO TOP SHOT OF SCALLOP VANNGUNS, LOADED W/4 JSPF, 90d PHASING, RDX, 32 GM. SET FOR A TOTAL OF 449 PERFORATIONS. HRS TESTING ASSEMBLY INCLUDES LPR-N, OMNI & IPO CIRC. VALVES, W/CHAMP III PACKER. OTHER: MGS C-LINE WELL STATUS: WELL SHUT-IN. TBG @ 650#, CSG @ 585. SCHEDULED FOR SLICKLINE WORK FOR DEPTH DETERMINATION AND SLIDE TUBING SLEEVE OR PULL DUMMY GLV. 06/15/90 TIH W/VANN/HRS (HALLIBURTON RES. SERVICES) PERF/TEST BHA. FILL TUBING TO 4390~ W/8.3# FRESH WATER FOR UNDERBALANCE OF 2500#. CONTINUE TIN W/VOIDED TUBING T/11368~ DPM. RABBIT TUBING AS REQUIRED. M/U HRS TEST HEAD W/TUBING. R/U ATLAS WIRELINE & RIH W/GR/CCL TOOLS FOR CORRELATION WITH DIL SURVEY. TIE-IN R/A PILL @ 10901.7~. TOP INTERVAL @ 11190~-11236~, LOWER INTERVAL @ 11280~-11358~ DIL MEAS. R/U HRS MANIFOLD & FLOW TEST SYSTEM. PRESSURE TEST @ 500# & 3500#. POH & R/D ATLAS WL. SET CHAMP III PACKER. PREPARE TO PERFORATE. SHOOT BASELINE FLUID LEVEL. RAISE ANNULUS PRESSURE T/1500# TO OPEN LPR-N. NOTE: UPON OPENING ANNULAR SECTION BELOW PACKER TO UNDERBALANCED TBG VOLUME, FLUID LEVEL SURVEYS INDICATED A RISING FLUID COLUMN PRIOR TO FIRING PERF. GUNS. THIS ACTIVITY INDICATED THE RETRIEVABLE BRIDGE PLUG MAY HAVE FAILED W/UNDERBALANCE CONDITIONS, THEREFORE FLUID LEVEL DATA AFTER PERFORATING MAY BE SUSPECT. REFER TO FLUID LEVEL DATA BELOW. PRESSURE ON ANNULUS TO CYCLE OMNI VALVE IN CIRC. MODE. REVERSE CIRC. TEST FLUIDS TO PRODUCTION. 47 bbls OILY FLUIDS PRODUCED & SAMPLED. UNSEATED CHAMP III PACKER WITH CONSIDERABLE DIFFICULTY. MONITOR WELL FOR UNDERBALANCE CONDITIONS & FLOW. NO FLOW, WELL STABILIZED. REVERSE CIRC. 1 TBG VOLUME TO DISPLACE TEST FLUIDS BELOW PACKER. MONITOR WELL FOR FLOW. R/D HRS TEST MANIFOLD & TEST HEAD, PREP T/POH. POH W/VANN/HRS PERF & TEST BHA. SLOW THROUGH 7" TO AVOID SWABBING. LAY DOWN VANN GUNS & HR$ TEST BHA. SAMPLES RECOVERED F/HR$ CHAMBER. OBSERVE ALL GUNS FIRED. R/U & TEST BOPE. (CHOKE MANIFOLD & ACCESSIBLE VALVES WERE TESTED WHILE POH W/BHA). TEST ALL RAMS & VALVES, KELLY & STAND PIPE @ 250#/5000#. TEST ANNULAR PREVENTER @ 250#/3500#. PERFORMANCE TEST ACCUMULATOR. OTHER: - PUMPED 67 bbls OF TEST FLUIDS TO PRODUCTION.- MGS C-LINE WELL: R/U & RIH WITH WL GAUGE TOOL. COULD NOT SAFELY GO BELOW SECOND PACKER (POSSIBLE STUCK TOOL). PREP T/PULL GLV @ 10704. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 22 TIME HRS FLUID LEVEL DATA - HK/HN & HI/HK FLUID FLUID DEPTH RISE ACTIVITY OTHER 1100 1145 6458' 1204 1205 5197' 1210 5289 -92 1215 5258 31 1220 4920 338 1225 4905 15 1230 4843 62 1235 4812 31 1240 4776 46 1245 4736 30 1250 4689 47 1255 4651 38 1300 4620 31 1305 4589 31 SET PACKER SHOOT FLUID LEVEL OBSERVE RAPID RISE IN FL PRIOR TO FIRING GUNS GUNS FIRE GAS BUBBLE ? GAS BUBBLE ? ANNULUS @ 1500# ANNULUS @ 1500# ANNULUS @ 3400# TOTAL FLUID RISE @ 1869' NOTE: THE FLUID RISE PRIOR TO FIRING THE PERFORATION GUNS IS PROBABLY DUE TO THE RETRIEVABLE BRIDGE PLUG (PARTIALLY) FAILING IN UNDERBALANCE CONDITIONS. THIS CONCLUSION IS DUE TO THE FACT THAT THE ANNULUS PRESS. DID NOT CHANGE & FORMATION HAD NOT BEEN EXPOSED. VARIATIONS IN THE FLUID LEVEL AFTER PERFORATING MAY BE DUE TO THE INFLUX OF A GAS BUBBLE AND SUBSEQUENT EXPANSION. 06/16/90 FINISH TESTING BOPE AND RIG DOWN TEST EQUIPMENT. RIH WITH HOWCO OVERSHOT AND STRING MILL ON 3 1/2" TUBING TO 11,400' WASH TO 11,409'REVERSE SAND TO PITS. POH, DID NOT RECOVER RPB RIH, (SLIP AND CUT DRLG.LINE) WASH AND ROTATE TO 11,409, PULL RPB FREE POH WITH RPB SET AND CHECK IN LINER TOP, RELEASE AND POH. OTHER; C-SOUTH LINE WELL UNABLE TO PULL GLV #7 AT 10,704' ATTEMPT TO OPEN OTIS "XO" SLIDING SLEEVE AT 11,709' WITH NO SUCCESS, RIG DOWN LUBRICATOR AND WIRELINE EQ. 06/17/90 POH WITH BRIDGE PLUG, MAKE UP NEW OVERSHOT AND RIH, TAG SAND 11,429 WASH AND REVERSE OUT SAND TO TOP OF PLUG @ 11,559 UNSEAT PLUG AND POH, LAY DOWN PLUG AND STRING MILL. PICKUP CLEANOUT ASSEMBLY AND RIH, TAG SAND @ 11,559' CIRCULATE AND WASH TO 11,636' REVERSE OUT, RECOVER 2 DRUMS OF SAND CIRC. AND WASH TO 11,723', REVERSE OUT 2 DRUMS OF SAND. CIRCULATE THROUGH BAKER SAND FILTER AT REPORT TIME. 06/18/90 CIRCULATE COMPLETION FLUID THROUGH BAKER SAND FILTER, SEND SAMPLE TO LAB. FINAL TSS 37 PPM. CIRCULATE CORROSION INHIBITER. LAY DOWN 3 1/2" WORK STRING. CHANGE TO 2 7/8" PIPE RAMS ,AND TEST PREVENTERS. RUNNING 2 7/8" PRODUCTION STRING. \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 23 06/19/90 LAND TUBING STRING WITH OTIS BELL TYPE SHEAR OUT SUB AND WIRELINE ENTRY GUIDE AT 10,947' (R.T. MEASUREMENT) PRESSURE UP TUBING TO SET BAKER HB PACKER.(SETTING PRESSURE 1600 PSI) HELD 2500 PSI TO TEST TUBING AND PICKED UP STRING AND SHEARED SET SCREWS HOLDING SEAL ASSEMBLY. TO PBR. PRESSURE HELD AND PACKER SET. LANDED TUBING AND RAN IN LOCK SCREWS. INSTALL BPV. ITEM DEPTH OTIS SSSV 300.07 OTIS XD SLIDING SLEEVE 10,846 BAKER HB PACKER 10,897 OTIS XN NIPPLE 10,935 UP WEIGHT ON STRING BEFORE SETTING PKR. MANDREL NO. 1 2 3 4 5 6 98,000# (WITH 2500 PSI ON TUBING PULLED 7 8000# OVER TO SHEAR OUT OF PBR) 8 9 10 11 DEPTH 1783.56 3341.64 4868.08 6235.16 7317.93 8118.19 8666.92 9215.06 9732.87 10282.69 10800.77 NIPPLE DOWN BOP AND PULL RISER. INSTALL PRODUCTION TREE, FLOWLINE AND GAS INJECTION LINE. CAMERON REP. TESTED CONTROL LINE "T" SEALS AND TREE RIG UP SLICKLINE UNIT MAKE DUMMY GUN RUN OUT OF EOT, OPEN OTIS XD SLIDING SLEEVE WITH OTIS "B" SHIFTING TOOL. NO WIRELINE PROBLEMS. PUMP 730 BBLS. FIW DISPLACE COMPLETION FLUID. RIG DOWN CHICKSAN LINES AND VALVES AND TURN WELL OVER TO PRODUCTION AT 0230 06/19/90 WELL UN- LOADED APPROX. 250 BBLS AT 0500 CASING PRESSURE 860 PSI. 06/20/90 LAY DOWN REMAINING 2 7/8 TUBING, CLEAN RIG, WELL HEAD ROOM. SET AND RIG UP HOWCO BATCH BLENDER FOR DE MUD MIXING. PUMP FRESH WATER THROUGH UNIT AND CHECK OUT EQUIPMENT. PREPARE HYDRAULIC RIG JACKS FOR MOVE. CHANGE PIPE RAMS TO 3 1/2, PREPARE RIG FOR MOVE. C-LINE WELL: REMOVE WATER INJECTION LINE AND INSTALL VALVE TO ACCESS TUBING. REMOVE GAUGE FLANGE FROM ANNULUS AND INSTALL VALVE. FLOW TEST 12-23: ANNULUS LIFTED DOWN TO GLV #8 @ 9215 MD 0500 HRS TOTAL FLUID 965 CUT 65.0 B/D OIL 151 TOTAL OIL 44.9 B/D WATER 281 INJ GAS 1000 TBG PSI 100 CSG PSI 820 06/21/90 PRODUCTION TESTING PRIOR TO PERFORATING HN-HR, HE-HF, HC-HD CHECK VALVES AND SEATS IN MUD PUMPS, OPERATE JACKING SYSTEM AND CHECK FOR LEAKS. GREASE VALVES IN CHOKE MANIFOLD AND HCR. RIG UP BLENDER FOR DE MUD MIXING OPERATION. AFTER LIFTING LOAD WATER BELOW GLV #10 RIG UP SLICKLINE AND CLOSE OTIS "XD" SLIDING SLEEVE AT 10,846' \DRILLING~C12-23\DAILYRPT.DOC PAGE NO. 24 TIME TOTAL FLUID CUT B/D OIL B/D WATER CSG. PSI 1230 1298 38.0 208 128 745 0130 1312 36.0 215 121 745 0230 1327 36.0 230 130 740 0330 1340 36.0 200 112 740 0430 1353 34.0 206 106 735 0530 1367 34.0 222 114 735 0630 1380 30.0 218 94 730 0730 1393 30.0 218 94 730 0830 1407 32.0 228 108 730 0930 1420 30.0 218 94 730 1030 1433 30.0 218 94 730 1130 1445 26.0 213 75 725 1230 1457 27.0 210 78 725 1330 1469 25.0 216 72 725 RIG UP ATLAS WIRELINE. TEST LUBRICATOR T/2000 PSI. OK. PERF~ED HN-HR, 11398-11412 AND HE-HF, 11078-11120 WITH DECENTRALIZED 2 1/8" SILVERJET, LOADED 4 JSPF, ZERO PHASED WITH 16 GRAM CHARGES. CORRELATED W/SBT/CCL/GR LOG DATED 05/17/90. STARTED IN HOLE W/GUN #3 TO PERF THE HC-HD, 10984~-11010~ AND STUCK GUN AT 8607~ (WLM). GLM #7 IS AT A DEPTH OF 8667~.(TBG MEASUREMENT) WORKED LINE, FLOWED WELL, WORKED LINE AGAIN. PULLED 2000# OVERPULL. ROPE SOCKET PULL OUT IS AT 3900# OVERPULL. FLOWING WELL AT REPORT TIME TO STABILIZE FLOW. HOLDING 2000# TENSION ON STUCK GUN. 06/22/90 PROD TEST PRIOR TO PERF~ING HN-HR, HE-HF, HC-HD. TIME TOTAL FLUID CUT B/D OIL B/D WATER CSG PSI 0630 1380 30.0 218 94 730 0730 1393 30.0 218 94 730 0830 1407 32.0 228 108 730 0930 1420 30.0 218 94 730 1030 1433 30.0 218 94 730 1130 1445 26.0 213 75 725 1230 1457 27.0 210 78 725 1330 1469 25.0 216 72 725 RIG UP ATLAS WIRELINE. TEST LUBRICATOR T/2000 PSI. OK. PERF~ED HN-HR, 11398-11412 AND HE-HF, 11078-11120 WITH DECENTRALIZED 2-1/8" SILVERJET, LOADED 4 JSPF, ZERO PHASED WITH 16 GRAM CHARGES. CORRELATED W/SBT/CCL/GR LOG DATED 05/17/90. STARTED IN HOLE W/GUN #3 TO PERF THE HC-HD, 10984~-11010~ AND STUCK GUN AT 8607~ (WLM). GLM #7 IS AT A DEPTH OF 8667~. (TBG MEASUREMENT) WORKED LINE, FLOWED WELL, WORKED LINE AGAIN. PULLED 2000# OVERPULL. ROPE SOCKET PULL OUT IS AT 3900# OVERPULL. FLOWING WELL AT REPORT TIME TO STABILIZE FLOW. HOLDING 2000# TENSION ON STUCK GUN. 06/23/90 SHUT WELL IN TO BUILD UP TBG PSI. PULLED 2750 OVERPULL ON STUCK GUN AND SURGED WELL. DID NOT FREE GUN. CLOSED OFF FLOW FROM WELL AT THE VALVE. PULLED LINE OUT OF ROPE SOCKET WITH 4050# \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 25 OVERPULL TO REMOVE LINE FROM WELL. POH W/ALL WIRELINE. RIG ATLAS ASIDE. RIG UP SHELL SLICKLINE UNIT. TEST LUBRICATOR T/2000#. OK. RIH W/1 5/8" JDC PULLING TOOL. LATCHED ONTO FISH AT 8607', HIT JARS ONCE, FISH CAME FREE. POH. LAYED DOWN FISH. (GUN #3) FULL RECOVERY. FLOW WELL. RAN 2 1/8" DUMMY GUN T/10850 ON SLICKLINE W/NO PROBLEMS. POH, RIG DOWN RIG UP ATLAS, TEST LUBRICATOR T/2000#. OK. RIH W/2 1/8" SILVERJET GUN LOADED 4 JSPF, 16 GRAMS, ZERO DEG PHASING AND PERFED 10984' TO 11010'. POH, RIG DOWN ATLAS. RIG UP SHELL SLICKLINE. SET SSSV AT 300', POH. RIG DOWN. TEAR OUT RIG FOR MOVE TO NEW LOCATION. RIG RELEASED AT 0600 HRS 06/23/90 FROM C12-23. ACCEPTED ON C-LINE WELL NOTE' 06/25/90 MODIFIED REPORT TO CORRECT PERF'ED DEPTH'S. DEPTH SHOWN ON THIS REPOT NOW REFLECT DEPTH'S REPORTED ON ATLAS SERVICE ORDER #42405 DATED 23JUN90. \DRILLING\C12-23\DAILYRPT.DOC PAGE NO. 26 ORIGINAL ? ffCROFiLMED SURVEY REPORT S.W.E.P.I. MGS C12-23 SLOT # 26 KENAI BOROUGH COOK INLET, ALASKA MAY 22, 1990 Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77224 713/461-3146 Fax: 713/461-0920 May 22, 1990 Mr. Randy Wagner S.W.E.P.I. 601 West 5th Street, Suite 810 Anchorage, Alaska 99501 Re: MGS C12-23 Slot # 26 Kenai Borough, Cook Inlet, Alaska Dear Mr. Wagner: Enclosed please find one (1) original and six (6) copies of the completed survey of Well No. 26. We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Sincerely, Gary cht Vice President, Technical Services GU/cv Enclosures Gyrodata Services, Inc. Houston, TX / Lafayette, LA / New Orleans, LA/Ventura, CA / Aberdeen, U.K. / Calgary, Alberta Anchorage, AK / Kuantan, Malaysia / Buenos Aires, Argentina / Bergen, Norway A Gyrodata Directiona1 for Survey SWEPI MGS C12-23 (SLOT #26) KENAI BOROUGH, COOK INLET, ALASKA Date Run: 17-b~Y-90 2t:30:00 Job Number: AK0590G228 Surveyor: AL KUDRLE Calculation Method: RADIUS OF CURVATURE Survey Latitude: 60deg 45min 36sec N Bearings Corrected ldeg 18min 20sec EAST to Grid North Proposed Well Direction: N 48deg 48min Osec W Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference {WEPI IGS C12-23 (SLOT #26) ~ENAI BOROUGH, COOK INLET, ALASKA lob Number: AK0590G228 A Gyrodat a Directional Survey blEAS INCL BORE HOLE DEPTH BEARING ft deg min deg min .0 0 0 N 0 0 E 100.0 0 9 N 83 21 E 200.0 0 11 N 14 36 W 300.0 0 35 N 66 58 W 400.0 0 50 S 28 49 E 500.0 3 43 S 36 19 E 600.0 4 49 S 7 8 E 700.0 4 16 S 26 40 W 800.0 5 5 S 64 58 W 900.0 5 55~ N 85 39 W 1000.0 7 23 N 71 15 W 1100.0 8 23 N 70 18 W 1200.0 8 33 N 75 15 W 1300.0 8 40 N 79 58 W 1400.0 9 16 N 83 24 W 1500.0 10 11 N 82 46 W 1600.0 11 15 N 81 42 W 1700.0 12 22 N 79 39 W 1800.0 13 43 N 77 1 W 1900.0 15 11 N 74 40 W 2000.0 16 55 N 71 50 W 2100.0 18 30 N 70 1 W 2200.0 20 16 N 67 50 W 2300.0 21 49 N 66 1 W 2400.0 23 47 N 64 22 W DOG-LEG VERT VERT SEVERITY DEPTH SECTION deg/100' ft ft CLOSURE DISTANCE BEARING ft deg min .00 .0 .0 .0 N 0 0 E GYRODATA SURVEY RUN IN 9.5/8" AND 7" CASING MEASURED DEPTHS REF TO PLATFORM C RKB .15 100.0 ~i -.1 .1 N 83 21 E .25 200.0 -.1 .4 N 50 38 E .49 300.0 .6 .7 N 11 19 W 1.33 400.0 .6 .8 N 89 1 W 2.90 499.9 -3.2 2.39 599.6 -9.8 2.69 699.3 -13.8 3.16 799.0 -13.2 2.90 898.5 -7.3 3.6 S 22 18 E 11.0 S 21 55 E 18.1 S 8 48 E 23.6 S 7 14 W 28.0 S 26 5 W 2.2i 997.8 2.7 1.01 1096.9 15.5 .75 1195.8 28.9 .72 1294.7 42.0 .81 I393.4 55.1 32.8 S 46 0 W 40.9 S 63 26 W 52.5 S 74 37 W 66.1 S 80 40 W 81.1 S 84 0 W .91 1492.0 69.1 1.09 1590.3 84.6 1.19 1688.1 102.0 1.48 1785.6 121.6 1.58 1882.4 143.8 97.7 S 86 13 W 116.0 S 88 4 W 136.1 S 89 45 W 158.2 N 88 34 W 182.6 N 86 51 W 1.90 1978.5 ~169.0 1.67 2073.8 197.2 1.92 2168.1 228.3 1.68 2261.4 262.4 2.07 2353.6 299.6 209.6 N 85 4 W 239.2 N 83 17 W 271.5 N 81 33 W 306.3 N 79 51 W 344.0 N 78 13 W HORIZONTAL COORDINATE, feet .00 N .00 E .02 N .13 E .23 N .27 E .71N .14 W .01N .77 W 3.33 S 1.37 E 10.16 S 4.09 E 17.85 S 2.77 E 23.43 S 2.98 W 25.13 S 12.31 W 22.82 S 23.63 W 18.30 S 36.59 W 13.94 S 50.65 W !0.73 S 65.26 8.47 S 80.76 6.44 S 97.47 W 3.93 S 115.89 W .61S 136.08 W 3.95 N 158.17 W 10.05 N 182.36 W 18.02 N 208.83 W 27.96 N 237.56 W 39.89 N 268.52 W 53.96 N 301.55 W 70.22 N 336.72 W 4EPI ;S C12-23 (SLOT 026) 2NAI BOROUGH, COOK INLET, ALASKA ~b Number: AK05906228 A Gyro dar a Directional Survey Page MEAS INCL BORE HOLE DOG-LEG DEPTH BEARING SEVERITY ft deg min deg min deg/100' 2500.0 25 57 N 62 52 W 2600.0 28 27 N 61 45 W 2700.0 30 9 N 60 29 W 2800.0 31 40 N 59 59 W 2900.0 32 59 N 58 51 W 3000.0 34 36 N 58 46 W 3100.0 36 27 N 57 40 W 3200.0 38 6 N 56 51 W 3300.0 38 41 N 60 42 W 3400.0 39 31 N 64 17 W 3500.0 40 29 N 65 27 W 3600.0 39 4 N 64 32 W 3700.0 39 20 N 64 44 W 3800.0 38 29 N 63 54 W 3900.0 38 57 N 64 1 W 4000.0 37 30 N 62 38 W 4100.0 37 35 N 61 39 W 4200.0 38 39 N 61 27 W 4300.0 39 27 N 61 16 W 4400.0 40 19 N 61 22 W 4500.0 40 53 N 60 42 W 4600.0 41 22 N 60 1 W 4700.0 42 18 N 59 57 W 4800.0 42 38 N 59 34 W 4900.0 42 37 N 59 19 W 2.26 2.54 1.81 1.54 1.46 1.61 1.97 1.72 2.46 2.42 1.22 1.54 .30 1.01 .48 1.69 .60 1.09 .81 .85 .72 .65 .94 .41 .17 VERT DEPTH ft 2444.3 2533.3 2620.5 2706.3 2790.8 2873.9 2955.2 3034.8 3113.2 3190.8 3267.4 3344.3 3421.8 3499.6 3577.6 3656.2 3735.5 3814.1 3891.8 3968.5 4044.4 4119.8 4194.3 4268.0 4341.6 VERT SECTION ft '340.3 384.7 432.5 482.9 535.4 590.2 647.5 707.4 768.6 829.8 891.6 953.0 1013.8 1074.3 1134.7 1194.6 1253.9 1314.1 1375.6 1438.2 1501.8 1566.2 1631.7 1697.9 1764.5 CLOSURE DISTANCE BEARING ft deg min 384.8 N 76 38 W 429.2 N 75 8 W 476.9 N 73 42 W 527.0 N 72 24 W 579.2 N 71 13 W 633.6 N 70 8 W 690.6 N 69 8 W 749.9 N 68 11W 811.2 N 67 28 W 874.1 N 67 7 W 938.3 N 66 57 W 1002.3 N 66 50 W 1065.4 N 66 42 W 1128.2 N 66 34 W 1190.6 N 66 26 W 1252.4 N 66 17 W 1313.2 N 66 5 W 1374.7 N 65 53 W 14.37.6 N 65 41 W 1501.5 N 65 30 W 1566.4 N 65 19 W 1631.9 N 65 7 W 1698.4 N 64 55 W 1765.6 N 64 43 W 1833.1 N 64 31 W H O R I ZIONNATTAE COORD feet 88.92 N 374.40 W 110.16 N 414.87 W 133.80 N 4.57.71 W 159.30 N 502.30 W 186.50 N 548.34 W 215.31 N 595.91 W 245.91 N 645.29 W 278.67 N 696.23 W 310.86 N 749.32 W 339.98 N 805.24 W 367.29 N 863.44 W 394.34 N 921.41W 421.42 N 978.52 W 448.64 N ' 1035.12 W 476.10 N 1091.31fw 503.88 N 1146.59( 532.35 N 1200.46 W 561.76 N 1254.73 W 591.96 N 1310.02 W 622.75 N 1366.27 W 654.27 N 1423.20 W 686.80 N 1480.36 W 720.17 N 1538.12 W 754.16 N 1596.44 W 788.59 N 1654.76 W A Gyrodata Directional Survey WEPI iGS C12-23 (SLOT #26) ENAI BOROUGH, COOK INLET, ALASKA ob Nm~-~ber: AK0590G228 Page btEAS INCL BORE HOLE DOG-LEG DEPTH BEARING SEVERITY ft deg min deg min deg/100' 5000.0 43 6 N 58 47 W 5100.0 43 28 N 58 31 W 5200.0 43 45 N 57 48 W 5300.0 43 42 N 57 10 W 5400.0 43 44 N 56 35 W 5500.0 44 5 N 56 6 W 5600.0 43 28 N 55 5 W 5700.0 42 47 N 53 47 W 5800.0 41 36 N 52 38 W 5900.0 41 22 N 51 26 W 6000.0 41 41 N 50 53 W 6100.0 41 45 N 50 1 W 6200.0 42 2 N 49 44 W 6300.0 42 27 N 49 8 W 6400.0 42 11 N 48 9 W 6500.0 42 2 N 47 50 W 6600.0 41 22 N 46 47 W 6700.0 40 33 N 46 32 W 6800.0 39 49 N 45 43 W 6900.0 39 31 N 45 30 W 7000,0 39 25 N 44 12 W 7100.0 38 45 N 43 24 W 7200.0 39 21 N 42 44 W 7300.0 38 53 N 42 19 W 7400.0 37 58 N 41 33 W .6O .42 .57 .44 .40 .48 .93 1.12 1.42 .83 .49 .58 .34 .58 .71 .25 .97 .83 .91 .32 .83 .84 .74 .55 1.02 VERT DEPTH ft 4414.9 4487.7 4560.1 4632.4 4704.7 4776.7 4848.9 4921.9 4996.0 5070.9 5145.8 5220.4 5294.9 5368.9 5442.8 5517.0 5591.7 5667.2 5743.6 5820.6 5897.8 5975.4 6053.1 6130.6 6209.0 VERT SECTION ft 1831.4 1.899.0 !967.0 2~035.4 2103.8 2172.5 2241.2 2309.3 2376.2 2442.4 2508.6 2575.1 2641.9 2709.1 2776.4 2843.5 2910.0 2975.5 3039.9 3103.7 3167.1 3229.9 3292.6 3355.3 3417.0 CLOSURE DISTANCE BEARING ft deg min 1900.8 N 64 19 W 1969.0 N 64 8 W 2037.6 N 63 56 W 2106.3 N 63 43 W 2175.0 N 63 30 W 2243.8 N 63 17 W 2312.4 N 63 3 W 2380.0 N 62 48 W 2446.2 N 62 32 W 2511.4 N 62 16 W 2576.5 N 61 59 W 2641.7 N 61 41 W 2707.1 N 61 24 W 2772.9 N 61 7 W 2838.7 N 60 49 W 2904.1 N 60 32 W 2968.9 N 60 14 W 3032.6 N 59 57 W 3095.3 N 59 39 W 3157.3 N 59 23 W 3218.9 N 59 6 W 3279.7 N 58 48 W 3340.4 N 58 31 W 3401.1 N 58 13 W 3460.8 N 57 56 W HORIZONTAL C 00RD INA T E~ feet 823.56 N 1713.09 W 859.23 N 1771.65 W 895.63 N 1830.24 W 932.79 N 1888.53 W 970.56 N 1946.40 W 1008.99 N 2004.12 W 1048.09 N 2061.20 W 1087.85 N 2116.81 W 1128.07 N 2170.59 W 1168.82 N 2222.82 W 1210.40 N 2274.46 1252.77 N 2325.77 1295.80 N 2376.82 1339.52 N 2427.89 1384.00 N 2478.41 1428.88 N 2528.24 1473.98 N 2577.14 W 1518.96 N 2624.81 W 1563.68 N 2671.32 W 1608.34 N 2716.93 W 1653.41 N 2761.76 W 1698.90 N 2805.40 W 1744.92 N 2848.42 W 1791.42 N 2891.07 W 1837.65 N 2932.60 W WEPI [GS C12-23 (SLOT #26) iENAI BOROUGH, COOK INLET, ALASKA 'ob Number: AKO590G228 A Gyro dar a Directional Survey Page MEAS INCL BORE HOLE DOG-LEG DEPTH BEARING SEVERITY ft deg min deg min deg/lO0' 7500.0 37 50 N 39 49 W 7600.0 37 19 N 38 42 W 7700.0 38 40 N 37 54 W 7800.0 39 46 N 37 26 W 7900.0 38 4 N 35 16 W 8000.0 35 12 N 33 51 W 8100.0 31 34 N 33 16 W 8200.0 28 54 N 31 10 W 8300.0 26 23 N 27 5 W 8400.0 24 1 N 24 43 W 8500.0 22 27 N 20 58 W 8600.0 20 47 N 17 31 W 8700.0 19 27 N 13 15 W 8800.0 18 19 N 10 41 W 8900.0 17 48 N 3 51 W 9000.0 17 24 N 3 21 E 9100.0 15 34 N 7 38 E 9200.0 14 7 N 10 16 E 9300.0 13 26 N 19 49 E 9400.0 15 6 N 29 50 E 9500.0 16 22 N 34 28 E 9600.0 18 5 N 37 24 E 9700.0 20 11 N 39 12 E 9800.0 '21 42 N 39 59 E 9900.0 22 31 N 48 1 E 1.07 .85 1.43 1.15 2.18 2.99 3.65 2.87 3.14 2.57 2.15 2.09 1.98 1.41 2.18 2.21 2.20 1.60 2.37 2.97 1.78 1.92 2.18 1.55 3.13 VERT DEPTH ft 6287.9 6367.1 6446.0 6523.4 6601.2 6681.5 6764.9 6851.3 6939.9 7030.4 7122.3 7215.2 7309.1 7403.8 7498.8 7594.1 7690.0 7786.7 7883.8 7980.7 8077.0 8172.5 8267.0 8360.4 8453.0 VERT SECTION ft 3477.8 3537.9 3598.5 3660.5 3721.8 3779.7 3832.7 3881.0 3924.7 3963.9 3999.3 4031.4 4060.1 4086.0 4109.2 4129.2 4145.8 4159.4 4169.9 4176.8 4181.1 4183.8 4185.5 4186.5 4184.6 CLOSURE DISTANCE BEARING ft deg min 3519.5 N 57 38 W 3577.4 N 57 19 W 3635.7 N 57 0 W 3695.4 N 56 41 W 3754.4 N 56 21 W 3809.8 N 56 1W 3860.7 N 55 42 W 3907.0 N 55 25 W 3948.6 N 55 7 W 3985.8 N 54 49 W 40].9.3 N 54 31 W 4049.5 N 54 13 W 4076.3 N 53 55 W 4100.4 N 53 37 W 4121.9 N 53 18 W 4140.1 N 52 58 W 4155.0 N 52 38 W 4167.3 N 52 19 W 4176.5 N 52 1W 4182.2 N 51 41 W 4185.2 N 51 19 W 4186.7 N 50 55 W 4187.2 N 50 28 W 4187.4 N 49 59 W 4184.9 N 49 28 W HORIZONTAL C O O RD INA T E'~ feet 1884.24 N 2972.64 W 1931.46 N 3011.23 W 1979.76 N 3049.39 W 2029.81 N 3088.03 W 2080.41 N 3125.26 W 2129.55 N 3159.10 W 2175.39 N 3189.52 W 2217.98 N 3216.36 W 2258.49 N 3238.93 W' 2296.78 N 3257.53 W 2333.13 N 3272.84 W 2367.91N 3284.99 W 2401.07 N 3294.12 W 2432.73 N 3300.83 W 2463.46 N 3304.75 w 2493.67 N 3304.88 ~ 2521.91N 3302.16 W 2547.21N 3298.18 W 2570.17 N 3292.01W 2592.50 N 3281.67 W 2615.45 N 3267.25 W 2639.41 N 3249.S8 W 2665.13 N 3229.57 W 2692.67 N 3206.79 W 2719.73 N 3180.66 W ,WEPI [GS C12-23 (SLOT #26) iENAI BOROUGH, COOK INLET, ALASKA iob Number: AKO590G228 A Gy rodat a Directional Survey · Page MEAS INCL BORE HOLE DEPTH BEARING ft deg min deg min 10000.0 24 19 N 64 6 E 10100.0 27 7 N 76 0 E 10200.0 30 27 N 79 29 E 10300.0 34 34 N 79 30 E 10400.0 37 20 N 80 26 E 10500.0 40 13 N 82 21 E 10600.0 42 10 N 82 27 E 10700.0 44 18 N 83 56 E 10800.0 47 4 N 84 37 E 10900.0 50 27 N 84 57 E 11000.0 53 19 N 85 23 E 11100.0 54 51 N 86 0 E 11200.0 55 47 N 86 43 E 11300.0 55 44 N 87 25 E 11400.0 53 56 N 89 49 E 11500.0 51 51 S 88 39 E 11600.0¢q~/ 49 55 S 87 22 E 11692 0 48 37 S 87 39 E Flnal Statlon Closure: 3463.5 feet DOG-LEG VERT VERT SEVERITY DEPTH SECTION deg/100' ft ft 6.61 8544.8 4174.5 5.87 8634.9 4153.6 3.73 8722.5 4124.9 4.12 8806.8 4091.6 2.81 8887.7 4054.9 3.13 8965.7 4014.5 1.94 9041.0 3971.1 2.38 9113.8 3925.3 2.81 9183.7 3876.4 3.38 9249.6 3824.6 2.89 9311.3 3770.0 1.61 9370.0 3713.2 1.11 9426.9 3654.9 .57 9483.1 3595.6 2.66 9540.7 3535.4 2.42 9601.0 3474.9 2 17 9664 1 ' · .~7e© 3414.7 1.44 9724. 3360.3 North 34 deg 46 min 55 sec West CLOSURE DISTANCE BEARING ft deg min 4174.5 N 48 57 W 4153.7 N 48 25 W 4125.4 N 47 53 W 4093.1 N 47 17 W 4057.8 N 46 37 W 4019.5 N 45 55 W 3979.1 N 45 11 W 3936.9 N 44 24 W 3892.6 N 43 34 W 3846.4 N 42 42 W 3798.6 N 41 45 W 3749.9 N 40 46 W 3700.9 N 39 46 W 3651.9 N 38 43 W 3603.0 N 37 41 W 3554.1 N 36 41W 3506.1 N 35 41 W 3463.5 N 34 47 W H 0 R I Z 0 N T A L COORDI NATE~ feet 2741.84 N 3147.79 W 2756.62 N 3107.09 W 2766.84 N 3060.05 W 2776.64 N 3007.22 W 2786.88 N 2949.42 W 2796.26 N 2887.51 W 2804.97 N 2822.24 W 2813.09 N 2754.23 W 2820.23 N 2683.04 W 2827.07 N 2608.17 W 2833.69 N 2529.79 W 2839.78 N 2449.03 W 2845.00 N 2366.97 W 2849.23 N 2284.41W 2851.21N 2202.70 W \ 2850.40 N 2122.96 2847.69 N~=~2045.42 WD 2844.66 N[~' 1975 77 --! 1 II~HJt;ION INSI RLIMt NI CHARI' NO ]0 i · i- , I - · :-:-5-:--i-:..'----~--~---~-~-i- : : ' i I .i' '.t z _ ...... AOGCC GI~'OLOGICAL MA~'~RiALS iNV~N'TORY LIS'l: .......... ( check offor list data as it is r,,eceived 1 ',o~. ! ~;/~..K/go .... d;,i'.", hist°ry . '-"' survey ! ./I"~,.", t~t;~ I'c;re'd~sriPti'on cored i,n'te, Wa'lS ,, c,?r,e ,analysis dry ditch intervals .. digital data ....................................................... z_/~-/,~ , ........ i_'O(~ TqPE .......RUN ..... INTERVALS ': ....... SCALE NO. .................... .............................. , .......... ,,, ...... ........ .............. .... '~1 ......... ATLAS WIREMNE ISERVICEI;;I W~.~.em At:lee 5600 B Street, Suite 201 International Anchorage, AK 99518 · ------~ ~~ ~'.~-~-~ ~.~ ~,~._ .... TO: STATE OF ALASKA OIL & GAS CONSERVATION COMMISSION 3001 PURCUPINE DR ANCHORAGE AK 99501 ATTN: LIBRARIAN, LARRY GRANT POSTMASTER: RETURN POSTAGE GUARANTEED Dip'log.. ~___ ~ PRINTS ,~"~.~._~ - S E P IA Spectralog ' ' 1_ PRINTS N~"~I"~~,~/~PIA BHC / AL ~_ PRINTS NEG. 1 '~ DIFL .. 1 PRINTS NEG. ] SEPIA CD / CNL ~ PRINTS NEG. 1 SEPIA DIFL/CDL/CN 1 PRINTS NEG. ] SEPIA __ PRINTS ~ NEG. ~ SEPIA ~' ~ ~' / ~, ~ ~ __ PRINTS ~ NEG. ~ SEPIA ABOVE RECEIVED FROM: ATLAS WlRELINE Librarian, Larry Grant ATTENTION SIGNED .. · · . . DATE 19 .:: '; ..-L . ,' .} :...)~ .. .... ...~ .,]., ....'~ . -. ~. . .' . ' ~::: .; ,.-' ,,:? :,z '..:-.Z ' ~' % :.; :.? 7;;: ~-.:' ' :_: ,-:~?.t.' ; .. : ,..?.¥,7 ..j ... '~.. .-.. ;(..... _.. January 3I, ! 9.90 Telecopy= (907)~76-7542 Mr. M. L. Woodson Division Operations M~nager Shell Western E&P Inc. 601 W. Fifth Avenue, Suite 810 Anchorage, Alaska 99501-2257 Re: Middle Ground Shoal C12-23 Shell Western E&P Inc. Permit No. 90-20 Sur. Loc. Platform "C", Leg 4, Conductor 26 Btmhole Loc. 1782'F~, 3380'FEL, Sec. 23, TSN, R13W, SM. Dear Mr. Woodson: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conductiug drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. ~ere a dtverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very trul~y Moors, ~-V. Chat~rto~ Chairman of Alaska Oil and Gas Conservation Co~ission BY ORDER OF nE COMMISSION Enclosure Department of Fish & Game, Habitat Section wlo enc].. Department of Enviro~nental Conservation w/o encl. Mr. Bill H- Lamoreaux Shell Western E&P Inc. Q 601 West Fifth Avenue * Suite 810 Anchorage, Alaska 99501 January 19, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: SUBMISSION OF AN APPLICATION FOR PERMIT TO DRILL MIDDLE GROUND SHOAL C12-23 Enclosed, in tripli~te, is the Application for Permit to Drill the upcoming Middle GroUnd,Shoal well C12-23. The surface location is Platform C, Leg 4, 'Conductor 26. Drilling operations are expected to commence February 10, 1990, and continue for two and one-half months. In the unlikely event that H2S is encountered, we intend to comply with the 20 AAC 25.065 and follow the "Recommended Practices for Conducting Oil and Gas Production Operations Involving Hydrogen Sulfide." Please note that the closest producer is C21-23, which is 750' from the proposed well at the top of the producing interval. This well, C12-23 is the third producer in the governmental quarter section, for which we request a variance from Conservation Order #44, Rule I (Spacing Pattern) under provisions contained in Conservation Order #44, Rule 6 (Administrative Approval). The current well plan calls for a TVD of 10,040', but SWEPI would like to maintain the flexibility to drill to a maximum prognosed TVD of 10,500'. If you have any questions concerning this application, please call Ms. Susan Brown-Maunder at (907) 263-9613. Very truly yours, Division Operations Manager Alaska Division MLW/SBBM/af Enclosures SBBL/aogcc. 011890 ~-~. STATE OF ALASKA --- ALASKA AND GAS CONSERVATION C(. ¢IISSION PERMIT TO DRILL 20 AAC 25.005 I la. Typeofwork DrillxE3 Redrill '~1 lb. Type of welI. Exploratory ~ StratigraphicTest ,~ DevelopmentOil~ Re-Entry E3 DeepenE31 Service ~ Developement Gas ~ Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Shell Western E&P~ Inc. 105' KB feet Middle Ground Shoal 3. Address 6. Property Designation 601 West Fifth, Suite 810 Anchoraqe, AK 99501 ADL 18756 E, F, & G Pool 4. Location of well at surface Platform "C", Leg 4 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025~ Conductor 26. Middle Ground Shoal Blanket At top of productive interval 1915' FNL & 4080' FEL, 8. Well number Number Section 23, T8N, R13W, ASP C12-23 400HM7522 At total depth 1782, FNL & 3380' FEL, SEC. 23 9. Approximate spud date Amount$200,O00.00 T8N, R13W, ~ ~ February 10~ 1990 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth~MD a,dTVD) property tine 3575' feet 750' feet 3746' 12028' & 10040' feet 16. To be completed for deviated wells 17. Anticipated pressure ~see 20 AAC 25.035 (e)(2)) Kickoff depth 375 feet Maximum hole angl~5.3 0 Maximum surface 2118 psig At total depth ~VD) 57~ psig 18. Casing program Settin~ Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 1711/2'' 13-3/8" 54.5 K-55 ~BTC 1205 0' 0' 1205' 1200' 440 sx "G" + addi~ive~ 12-1/4" 9-5/8" 43.5 L-80 LTC ~559 0' 0' 4559' 4000' 560 sx "G" + additive~ 47 ~L-80 LTC ~7) 4~59' ~O00' 9538' 8000' 7706' "G" + Addi ti yes 8-1/2" 7" 26 I-PO I T~ 1~7~ 92~' 1~R1~~ R970' ~ ~ 32 P-110 LTC '1415 10613' 8970' 12028' 10040' 19. TO be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~ ~,, ,? ~; ~ ~ ~:~ ~ ~ Intermediate Production ",': :, ~,:? ~:' Liner .: : ~:.:~:~ ~,.:?~. :,.: ... Perforation depth: measured true vertical 20. Attachments Filing fee~ Property plat ~ BOP Sketch ~ Diverter Sketch ~ Drilling program ~ Drilling fluid program~ Time vs depth plot ~ Refraction analysis ~ Seabed report ~ 20 AAC 25.050 requirements certify ' t the foregoing is true and correct to the best of my knowledge Signed ~~ Title DIVISION OPERATIONS MGR. Date 01/19/90 Commission Use Only ~ ~~ s0-~- ~ o/~~ / 01/31/90 for other mqu~remonts Conditions of a~roval Samples roquiro~ ~ Yes ~ ~o Mud Io~ roquired ~ Yes Hydro,on su}fi~o measures ~ Yes ~ ~o Directional survey require0 ~Yes D ~o ~rovo~ by loner the commission ~ate 10-401 Rev. 12-1-85 ~ogcc.011890a Sub / 'iplicate Telecopy No. (907) 276-7542 January 29, 1990 ADMINISTRATIVE APPROVAL N O. 44.42 Re: The application of SHELL WESTERN E & P, INC. to drill, complete, and produce the Middle Groum. d Shoal 18756 No. C-12-23 in the Middle Ground Shoal Field. Mr. M. L. Woodson Division Operations Manager Alaska Division Shell Western E & P, Inc. 601 West Fifth Avenue, Suite 810 Anchorage, Alaska 99501 Dear Mr. Woodson.. The referenced application was received on January 19, 1990. The drilling of the Middle Ground Shoal No. C-12-23 is in the steeply dipping West Flank part of the field which requires closer than 80 acre areal well spacing to adequately drain this part of the reservoir. . · .... . The Alaska Oil and Gas Conservation Commission has studied the evidence available and hereby authorizes the drilling, com- pletion, and production of t~e referenced well pursuant to Rule 6 of Conservation Order 44. David W. JohnstOn Commissioner ' BY ORDER OF T~IE COM~-{ISSION dlf/3.AA44 MIDDLE WELL LOCATION PLAT GROUND SHOAL FIELD COOK INLET, ALASKA WELL: C12-23 LEASE NO.: ADL18756 A34-t4D C41-23 C21-23 C12-23 C22-23 23 C42-23 PLATFORM C .... ~_._3__~__ __C34 LEG NO. 1 , ~'"-' -- PROPOSED LOCATION AT TOP OF OBJECTIVE: 1915 FT. FROM N LINE AND 4080 FT. FROM E LINE SECTION 23, T 8 N, R 13 W A.S.P. PROPOSED LOCATION AT TOTAL DEPTH: 1782 FT. FROM N LINE AND 3380 FT. FROM E LINE SECTION 23, T 8 N, R 13 W A.S.P. MGSO00113.407 ALASKA DIVISION DRILLING PFIOGNO$1$ 1/11/90 WELL: C12-23 LOCATION' PLATFORM 'C', LEG 4, CONDUCTOR 26 OBJECTIVE: HEMLOCK EVALUATION GEOLOGY SWEPI ~NTEREST: 66.67% AFE NO: 263771 FIELD: MGS EST. ELEVATION: 105' (mean Iow Iow tide: 73') DRILLING CORES LLI o z ELEC. MUD SURVEYS LOGGER (_9 0 SIGNIFICANT FORMATIONS 24' Conductor -370 13-3/8' Surface Casing 1200 9-5/8' Protective Casing 8000 HC 9205' HZ 7' Prod. Liner [TD) 9905' 10040': WELL CASING DEPTH AND TVD MD CEMENT 370 . 205' .~ I J ¥ 9538' 10913' 11848' 12028' HOLE DEV. HOLE AND DIR. SIZE CONTROL T 17-1/2" 12-1/4' 8-1/2' MUD PROGRAM UJ Grid C:o:rrect/on = 1.31'(11 Ei~)~ _~J J. i Net rMa~netic: SUr_'vie:y C0trleC' ' ii surface L,oc ion ~li~g i4; Ci(~n.;clluciOrl 26 i ~TICAL $ ,7~'~TV~i ~ ........ L_LL_. CHANGE 'O LOWER. VSEC RLAT iv;sEc ~00 :DEPA IT;ClO0.O.') ' ' :: .... ' 'LOwEFI VERTICAL SECTION:::::: VSec Az= 90,0°. I t l'..!:,{ i 'FARGEf ~¢ g205'.TVD 1,09,13'MD '~-'~"i '": I'/ Iii i111 L I ! ~TDl 1;lq48'~DlI 1'0040"7 ~,/;jt!i [ VSEO 1000') ...... I I .1/11/90. DRILLING PROGRAM MIDDLE GROUND SHOAL C12-23 · e · · · · Rig up. Drill out 24" casing shoe with 17-1/2" bit. Continue drilling to 375~. Kick off at 375~ and directionally drill to 1,205~ MD using 17-1/2" bit. Run and cement 13-3/8", 54.5#, K-55, BTC casing. Nipple up BOP stack. Test all connections, valves, and rams to 3,000 psi. Test annular preventer to 2,500 psi. Test all kelly, stand pipe, and emergency valves to 3,000 psi. Test casing to 1,500 psi. All tests performed in accordance with AOGCC regulations. Drill out 10~ and perform leak off test. Directionally drill 12-1/4" hole to 9-5/8" casing point. Run wireline logs. Run and cement 9-5/8", 43.5 and 47#, L-80, LTC casing. Nipple up BOP stack. Test all connections, valves, rams kelly, standpipe and emergency valves to 5,000 psi. Test annular preventer to 3,500 psi. Test casing to 3,000 psi. All tests performed in accordance with AOGCC regulations. 10. Drill out 10~ and perform leak off test. 11. Directionally drill 8-1/2" hole to TD. caliper log. Run wireline logs and casing 12. Run and cement 7", 26#, L-80 and 32#, P-110, LTC liner. 13. Proceed with cased hole completion prognosis. RRW/O11090a. RECOMMENDED MUD PROGRAM C12-23 Interval: Mud Type: Recommended Properties: Interval: Mud Type: Recommended Propert i es: Interval: Mud Type: Recommended Properties: 17-1/2" HOLE 0- 1,205' Spud Mud (water and gel). Generic mud #2 * Weight : 8.5 to 9.0 ppg * Funnel Viscosity: 40 to 50 sec/qt * Plastic Viscosity : 5 to 10 cp * Yield Point = 10 to 20 lb/lO0 sq ft * Fluid Loss = no control * pH : 9.0 to 9.5 12-1/4" HOLE 1,205' to 9,538' Water and gel. Disperse only if required. Generic mud #2. * Weight : 8.8 to 9.5 ppg * Funnel Viscosity: 36 to 42 sec/qt * Plastic Viscosity = 5 t 12 cp * Yield Point : 10 to 15 lb/lO0 sq ft *API Fluid Loss = 20 cc * pH = 8.5 to 9.5 * MBT = 15 to 25 9,538' to 12,028' 8-1/2" HOLE Freshwater dispersed lignosulfonate mud with 1% KCl. * Weight: 9.3 to 9.8 ppg, or as required to combat waterflood pressure (11 ppg anticipated) * Salinity: 1% KC1 * Funnel Viscosity - 40 to 45 sec/qt * Plastic Viscosity: 15-20 cp * Yield Point: 10-20 lb/lO0 sq ft *API Fluid Loss: 10 cc; 5 cc by HC * HTHP FL at 150o; less than 20 cc; 10 cc by HC * pH: 9.5 t 10.5 * MBT: 15 to 25 RRW/O11090a. · · · · Be · CASING AND CEMENT PROGRAM C12-23 Run 13-3/8", 54.5#, K-55, BTC from 1,205~ to surface. Casing design criteria are attached. Cement surface casing using 20% excess on gaged hole volume from TD to conductor shoe. Lead with 240 sx Class "G" + 10% gel + 2% CaC12 + defoamer and friction reducer as required (12.8 ppg, 10.8 gal/sk, 1.94 cf/sk) followed by 200 sx Class "G" + 2% CaCl2 + defoamer and friction reducer as required (15.8 ppg, 5.0 gal/sk, 1.15 cf/sk). Perform top job within shoe of conductor. Run 9-5/8", 43.5 and 47#, L-80, LTC from TD to surface. See attached casing design criteria. Cement to 8,538~ MD (1000 ft above shoe) using 30% excess on caliper (preferably 4 arm caliper). Lead with an estimated 360 sx (based on a 15" hole) Class "G" + 4% gel + additives for rheologies (14.2 ppg, 7.6 gal/sk, 1.52 cf/sk, 2,000+ psi ultimate compressive strength) followed by 200 sx Class "G" + additives for rheologies (15.8 ppg, 5.0 gal/sk, 1.15 cf/sk). Run 7", 26 and 32#, L-80 and P-110, LTC from 12,028~ to 9,238~. See attached casing design criteria. Cement liner with Class "G" + 1% KC1 + retarder + defoamer + fluid loss agent for WL less than 100 cc @ 150OF as required (15.6 ppg, 5.2 gal/sk, 1.18 cf/sk). Total thickening time between 3 and 4 hours brought up to temperature in 50 minutes. An estimated 950 sx of cement will be required (based on 40% excess in 11" hole to HC and 9" hole below HC). RRW/OllO90a. . C12-23 CASING DESIGN Casinq Desiqn Criteria Frac Gradient Pressure Gradient Max Collapse Pressure Max burst Pressure 13-3/8" .57 .467 583 psi (Full evacuation) 1245 psi (1/3 BHP @ 9-5/8" csg pt) 9-5/8" .79 .467 3736 psi (Full evacuation) 3700 psi (injection pressure) 7" (Liner) .57 10,000 psi (pressure 10,000 psi (pressure from frac from frac treatment) treatment) Size 13-3/8" 0-1205' 0-1200' ACTUAL DESIGN CONDITION Grade/ Tension # Collapse Burst Depth Weiqht Couplinq Wt in Mut PSI PSI MD 54.5# K-55 56,000 561 1245 TVD BTC MD 43.5# L-80 TVD LTC 9-5/8" 0-4559' 0-4000' 4559-9538' MD 47# 4000-8000' TVD MD 26# TVD 7" 9238-10613' 7706-8970' L-80 LTC L-80 LTC P-110 LTC 10613-12028' MD 32# 8970-10040' TVD **Casing Rating/Design Factors** Tension (m) Collapse Burst 853/10+ 1131/2.02 2820/2.26 310,000 1868 3700 825/2.66 3714/1.99 6712/1.81 134,000 3736 3700 905/6.75 4805/1.29 6688/1 23,000 5120 3700 519/10+ 5435/1.06 7179/1.94 -19,000 10000 10000 N/A 10847/1.08 12120/1.21 RRW/O11090a. MISCELLANEOUS C12-23 The maximum pressure gradient is expected to be .571 psi/ft. Maximum BHP is expected to be .571 x 10,040 : 5,733 psi. The shallowest depth at which abnormal waterflood pressures could be encountered is below the protective shoe. Maximum surface pressure is expected to be 2118 psi, assuming a full column of .360 psi/ft oil. The well will be drilled in compliance with the Alaska Oil & Gas Conservation Commission's regulations issued April 2, 1986. The proposed well path is in the vicinity of the following active producers and injectors: C42-23, C24-23RD, C31-26, C34-23 and C24A-23. In order to prevent possible intersections with these wells, collision cones of uncertainty have been calculated for each well based on the survey instruments used to survey each. The proposed wellpath does not intersect any of these collision cones. Should the actual wellpath intersect any of these collision cones, the affected well(s) will be shut in and bled down. Single shot gyro surveys will be taken while drilling the surface hole and MWD surveys will be used while drilling intermediate hole. As noted in the drawing of the diverter, both 10" mechanical valves will be kept in an open position until the preventer is closed. The mechanical valves will be wired full open and tagged with instructions concerning proper Procedures for closing a valve in the event the preventer is closed. RRW/101090a. , 1'7-,,,"2" HOLE 2000"PSI STA~ .... TOP OF KELLY BUSHING ~ ,- ,,.: TOP OF DERRICK FLOOR j--' BOTTOM OF ROT AhY BEAM ~ DRILL co NIPPLE FLOW LINE FILL UP LINE ~ ~._ 20' ANNULAR !,,, · PREVENTER ~ VI 2000 PSI r,,J '~ '~L ~j/~/-~20' 2000 PSI FLANGE ~ ~../ r'--TO BE CONNECTED SO THAT VALVE IS ,[ ~' / AUTOMATICALLY & SIMULTANEOUSLY L J / OPENED WHEN THE ANNULAR PREVENTER IS CLOSED. BOTI'I 10" MECHANICAL FULt.-OPENING VALVES WILL DE IN AN OPEH POSITION. UPON CLOSING THE ,"-,NNULAR PREVENTFR THE PROPER DIVERTER LINE IS SELECTED. i ;::, MAIN DECK · 20' 2000 PSI RISER : , ~,,') .,... ~'" 20" 2000 PSI FLANGE ' WELLHEAD ROOM FLOOR ! i ¢/26/89 N.T.S. 1.4 1,...o 'f-"4' HOLE i(,,F c,::i:' KELLY BUSHING T OOn 3000 PSI ST/" ..... I I DRILL HIPPLE FLOW l. If-IE / FILl,_ UP LINE ~ -1"' ANN[)LAR BLIND RAM 5000 PSI PIPE RAM 5000 13-5/8' 5000 PSI FLANGE 3- i 8' CI~;.)KF! TOP OF SUBBASE I)RILL oP()OL -- .-' /, .,,' / ,/ ,// ,,~ "~, ~' 5000 MAIN [)ECK c~si 9/ 0/87 N.T.S. 5000 PSI RISER DRILL SPOOL 13-5/8' 5000 PSt FLANGE ......~.~. ............ 2 ......................................................... r'-I[ ' '~ ,~ ,,..c~/~,, ,l(lt.]O r~[~l F[ A," ~. L ,~ % .' L .... i , - 13-3/8" SOW X 13-5/8 3000 PSI 'WF' HOUSING NOTE: DIMENSIONS INCLUDE 1/2" GAP BETWEEN FLANGES 8'--'"'2" HOL'E 5'000 PSI ST'~'CK 1.40'; TOP L.,F KELLY BUSHING TOP OF DERRICK FLOOR I i BOTTOM OF ROTARY BEAM F"'" DRILL NIPPLE FLOW LINE FILL UP LINE ~ -- I~ ANNULAR L/! PREVENTER .... 13-5/8" 5000 PSI FLANGE BLIND RAM 5000 PSI PIPE RAM 5000 PSI .... ' I · 3-5/8" 5000 TOP OF SUBBASE / / / / ,_JPSI FLANGE [) -7---7--7i--7--,7----7-I7 ~~//~'J / // / ~2-1/16// KILL~ LIN~ SPOOL DRILL.j~_.~3!1/8__' CH~~j~~~~/~13_5/8. 5000PSI FLANGE/ MAIN DECK 5000 RISER ' AP' ''" SPOOL : mLICASING~ ~ FFL F- I'-I HEAD [--- I -~ 3000 Fa l !1 '---u_q ..----- i ..~ ................ · .... -, , ,..., ,~ ,~ 1~.-~ - - 9/10/87 13-3/8' SOW X 13-5/8 3000 PSI 'WF' HOUSING N.T.S. NOTE: DIMENSIONS INCLUDE 1/2" GAP BETWEEN FLANGES SHELL MINIMUM BOP STACK REQUIREMENTS Min. Min. No. Item I.D. Nominal 1 Flowi ina 7" 2 Fill up Line 2" 3 Drilling Nipple 4 Annular Preventer 5 Two single or one dual hydrualically operated rams 6 Drilling spool with 2" and 3" min. outlets 7 Gate Valve 3 1/8" 8 Gate Valve Power Operated 3-1/8" 9 Line to choke manifold 3" 10 Gate Valve 2-1/16" i 1 Check Valve 2-1/16" 13 Casing Spool 14 Valves Gate 1-13/16" i 5 Compound Pressure Gauge connector 16 Control plug or valve 1-13/16" 17 Kill line to rig mud pump manifold 2" 18 2" X 2" X 2" cross *NOTE: Additional specifications for Air/Gas Service are given in Shell Well Control Manual, Appendix 6.18. A rotating head shall be provided on Air/Gas Service OPTIONAL 12 Wear flange or bore protector 19 Gate valve 20 Line to roadside connection 2" 21 Rotating blowout preventer 22 Gate Valve power operated 6" DRAWING & CHECK LIST 104A SHELL CLASS 5M SURFACE INSTALLATIONS NORMAL AIR/GAS* FOR AIR/GAS DRILLING CONFIGURATION A ~ ANNULAR PREVENTER BLIND RAM PIPE RAM Location optional SHELL MINIMUM AUXILIARY EQUIPMENT REQUIREMENTS Master control w~lh Hydril pressure regulating valve. 4. ~ unit remote control Hydraulic BOP operat,ng umt. ~C, ee below for detail. · Kelly cocks [] Upper [] Lower Pressure Ratin0 5.000 psi · Kelly saver sub with protector rubber. · Inside BOP, surface type, for each size drill pipe. · Full opening ball valve for each size drill pipe in use. Labelled crossover subs for each different connection in drill strin~l. OPTIONAL AUXILIARY EQUIPMENT · Circulating head for each size drill pipe in use with steel pipe and Chiksan joints to reach stand pipe connection. · Inside BOP - Drop or downhole type. Cup or plug type BOP tester with spare seals. SHELL MINIMUM HYDRAULIC OPERATING UNIT SPECIFICATIONS Accumulator volume - must deliver 1.5 times the volume to make position change on all hydraul- ically operated units and retain 1:200 psi (200 psi above precharge) without pumps. Pump capacity to obtain 200 psi above accumulator precharge pressure in two (2) minutes or less, while closing annular preventer and opening choke line valve. See Section 4.31. Power for pumps - 2 sources required - Air-Electric or All Air (rig air plus separate air tank) - 2 pumps required. Lines from operating unit to BOP units 5,000 psi Minimum Yield IZ] Seamless steel lines .90" minimum I.D. [] Seamless steel lines with Chiksan joints. I[] Hose per Section 4.32 Operatincj unit fluids: Hydraulic oil or soluble oil. All controls shall be clearly marked to show unit operated. Blind Ram control to have easily removed latch or (}uard. Sufficient bottled nitrogen or other back-up storage system to equal accumulator capacity, manifolded to by-pass accumulator and close BOP directly. Alarm, or visual indicator to show when accumulator is shut off from preventers. _ SHELL MINIMUM MUD SYSTEM REQUIREMENTS Pump stroke counters each pump. Deaasser. Pit volume recorder with alarm. __ Flow line monitor. OPTIONAL MUD SYSTEM EQUIPMENT Trip tank (with 6th man) Flow line gas separator. MISCELLANEOUS EQUIPMENT SPECIFICATIONS AND INSTALLATION INSTRUCTIONS 7. I. All connections s__hal~ be welded, studded, flanged or Cameron clamp of comparable rating. 2. All flanges _shall be APl 6B or 6eX and ring gaskets sh.all be APl steel RX or BX. Do not re-use BX rings. Always use new rings below lower most preventer when flanges are parted. 3. Drilling spools shall be forged or forged and v~tded. Pipe spools not acceptable. 4. BOP stack shall be braced to subbase or suitable support by turnbuckled lines or rods. (No rigid connections.) .. 5. All gate valves shall be equipped with handwheeis. Rams should have manually operated screw locking exlensmns (extended beyond subbase) ready for use. 6. For land rigs the master control stalion and operaling unil shall be Iocaled at ground level e minimum of 50' from the well. The remotestat~on is to be located near the driiler's position. Inoperative condition of the remote unit is not lo interfere w~th operation of the master control unit. For platform and barge rigs she rTtaster control station and operating unit may be on the rig floor w~th the remote station located so that is protected from the well area end accessible from a logical evacuation route. Hydraulic lines may be high pressure hose provided they meet the require- ments Jn Section 4.3:2 in the Shell Well Control Manual. Housing and heating should be provided for accumulator, blowout preventers, choke manifold where conditions warrant. Contractor shal..___JI make no connection to casing head side outlets except by orders of Shell. One spare set pt ram blocks for the drill pipe in use shall be kept on rigs. 10. Any m~sai~gnment of rig should be corrected to avoid undue wear of casing. . 2. 3. 4. 5. 6. ' . 8. 9. 10. SHELL WESTERN E&P INC. MIDDLE GROUND SHOAL FIELD PLATFORM "C" CHOKE MANIFOLD 3' 5 KSI LINES CROSS 3" X 3' X 3" X 3' 5 KSI CROSS 3" X 3" X 3" X 3' X 3' 5 KSI 3" 5 KS! GATE VALVE ADJUSTABLE MANUAL CHOKE - 3' 5 KSi REMOTE OPERATED CHOKE - 2-9/16" 10KSI HYDRAULIC ADJUSTABLE PRESSURE GAGE 4' LINES MUD/GAS SEPARATOR 6' LINE TO MUD PITS INLET VENTED AT CROWN TO MIJD PITS PLATFORM 'C' SOLIDS CONTROL 111 1/~8 OPERATING MODE DRILLING UNWEIGHTED MUD DRILLING WEIGHTED MUD TRIPPING BUILD SLUG GATES CLOSED D, E, G D, E, G E, F,C,G C, D, F MUD FLOW ROUTINGi 1 -2-3-4-5 1 -2-3-4-5 4-5-2-3 1 -2-3-4 SOLIDS EQUIP. IN USE SS, 4' SS SS, 4' COMMENTS MAY WANT TO OPERATE 4' 4' TURNED OFF w/WEIGHTED MUD I I © OD I NOTE' All ec TRW / BRANDT I-.-- DEGASSER! BG-IO / ® DERRICK FLO-LINE SLUG PIT/ ® ~' SAND TRAP ualizers (except from pit 1 to Legend ~ TOP EQUALIZATION ~ BOTTOM EQUALIZATION ~ AGITATOR 2 are riser type and can be used for either top or bottom equalization. CHECK LIST FOR NEW WELL PERMITS ITEM (1) Fee (2) Loc APPROVE DATE (8) . (3) Admin '('9 thru'~'3') ' (~0 a~ ~3) (4) Casg (14 thru 22) le me 3. 4. 5. 6. 7. 8. e 10. 11. 12. 13. 14. 15. - YES Is the permit fee attached ....................................... ,.. Is Well to be lOcated in a defined pool ............................. Is we_l] located proper distance from property line .................. Is we~l located proper distance from other wells .................... Is suz~iCient undedicated acreage available in this pool ............ Is well to be deviated and is wellbore plat included ................ (5) BOPE (23 thru 28) 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is operator the only affected party ................................. Can permit be approved before fifteen-day wait ...................... Lease & Well No. ~D~ /"~,~. ~-~ ,' (~.-/~--~-'_~/?. ~ NO - - RE~fARK~ Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... ~ Is the drilling fluid program schematic and list of equipment adequate,~ Are necessary diagrams and descriptions of diverter and BOPE attached, z~ Does BOPE have sufficient pressure rating - Test to ~oo~mm° psig .. ~ Does the choke manifold comply w/API RP-53 (May 84) .... % ............. ,,~ Is the presence of H2S gas probable ................................. (6) OTHER '~29- th (6) Add: Geology: Engineering: rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE 0 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. P~QGRA~.: LIS Start of execution: REVISION: 4.1 Mon 4 JUN 90 2:48pm PART NUMBER: .-fl: e':/2 W5550-MICRO WELL DATA FILE: C:\WDSDATA\W04368.WDF ECC: 4359.00 COMPANY NAME: WELL NAME: FIELD: LOCATION: SHELL WESTERN E &P C 12-23 MIDDLE GROUND SHOAL PLATFORM C LEG 4 COND 26 Top of Well: Bottom of Well: Level Spacing: 1350.000 11820.000 0.500 NUMBER OF CURVES: DEPTH CHT RILD01 RILM TTEN TTEN01 18 CILD GR RILM01 SP GR01 SP01 RFOC SPD RFOC01 RILD SPD01 TEMP COMPANY:SHELL WESTERN E &P WELL:C 12-23 FIELD:MIDDLE GROUND SHOAL COUNTY:KENAI STATE:ALASKA TAPE INFORMATION FILE:MAIN .001 FILE INTERVAL: START= 11820.000 END= 1350.000 DEPT GR SPD SP RILD CILD RILM CHT TEMP TTEN RFOC 11~820. ~00 ~1795.000 11770.000 11745.000 11720.000 11695.000 11670.000 11645.000 11620.000 11595.000 11570.000 11545.000 11520.000 11495.000 11470.000 11445.000 11420.000 11395.000 11370.000 11345.000 11320.000 11295.000 -999.250 -999.250 0.000 0.200 0.000 12.463 129.239 4.817 60.454 6.523 176.200 27.679 91.206 40.287 81.222 43.463 68.736 63.267 66.829 89.273 76.086 54.901 104.065 18.157 101.620 60.402 126.805 59.762 369.944 59.098 143.686 32.959 161.658 52.643 168.347 52.722 154.321 78.000 134.969 70.852 134.072 58.509 150.889 63.384 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 24.124 -999.250 34.870 -999.250 30.980 -999.250 30.997 -999.250 29.997 -999.250 24.854 -999.250 26.906 -999.250 31.342 -999.250 29.761 -999.250 28.870 -999.250 29.888 -999.250 33.835 -999.250 28.360 -999.250 30.233 -999.250 27.233 -999.250 29.451 -999.250 27.761 -999.250 -999.250 -999.250 73.182 10.079 68.420 12.388 77.922 4.940 85.512 12.668 67.434 21.698 59.425 26.434 58.241 24.929 78.784 40.633 66.126 50.649 77.482 37.509 93.835 16.369 72.507 38.909 65.092 40~462 66.438 31.649 74.516 21.748 69.212 33.671 66.952 39.600 71.139 41.454 64.162 45.256 66.089 40.645 65.062 39.766 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 9.466 -999.250 -999.250 11.949 -999.250 -999.250 4.736 -999.250 -999.250 24.342 -999.250 2961.540 24.202 -999.250 3018.637 44.289 -999.250 2736.472 64.828 -999.250 2591.786 137.174 -999.250 3035.232 53.527 -999.250 3367.543 42.942 -999.250 3090.372 33.317 -999.250 2672.305 10000.000 -999.250 2829.098 10000.000 -999.250 2899.433 10000.000 -999.250 2849.330 10000.000 -999.250 3039.453 10000.000 -999.250 2666.828 10000.000 -999.250 3088.491 10000.000 -999.250 3029.769 10000.000 -999.250 3153.970 10000.000 -999.250 3287.605 10000.000 11~270. ~00 i1245.000 11220.000 1 C 12-23 DEPT 11195.000 11170.000 11145.000 11120.000 11095.000 11070.000 11045.000 11020.000 10995.000 10970.000 10945.000 10920.000 10895.000 10870.000 10845.000 10820.000 10795.000 123.838 55.155 138.141 38.514 128.316 54.215 GR RILD 131.745 62.204 206.409 32.563 148.924 19.154 188.167 77.178 886.727 55.755 165.785 32.038 125.429 13.721 271.158 24.949 160.945 53.906 218.108 28.176 291.272 16.949 185.679 9.216 113.028 7.494 277.087 3.747 260.506 22.801 418.707 5.506 194.025 7.148 31.997 -999.250 33.032 -999.250 32.652 -999.250 SPD CILD 27.578 -999.250 28.980 -999.250 13.549 -999.250 29.997 -999.250 31.761 -999.250 28.233 -999.250 29.124 -999.250 28.652 -999.250 30.106 -999.250 33.324 -999.250 25.997 -999.250 29.290 -999.250 29.233 -999.250 34.433 -999.250 27.216 -999.250 28.124 -999.250 26.762 -999.250 67.833 32.738 65.508 54.341 65.004 37.926 SP RILM 63.424 46.256 66.858 26.916 68.420 17.186 76.042 47.410 61.417 41.903 72.024 20.413 90.124 12.070 83.210 23.525 56.643 32.512 63.280 38.032 69.941 25.376 71.278 7.868 78.711 6.565 78.827 3.533 72.830 19.675 71.838 5.015 77.564 6.964 -999.250 -999.250 -999.250 CHT -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 TEMP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 3440.038 2820.709 3292.198 TTEN 3293.075 3343.436 2728.567 2965.473 3139.853 3036.869 2992.254 3114.003 2989.322 3036.882 3237.238 3275.450 2890.794 2902.337 2972.596 2914.362 3241.047 10000. 000 10000. 000 39.725 RFOC 43.424 14.443 11.159 58.879 66. 125 27.371 10.542 24.249 60.751 30.345 13.565 6.635 6.552 4.489 17.818 4.739 6.323 10~770 . 000 10745.000 10720.000 10695.000 10670.000 10645.000 10620.000 10595.000 1 C 12-23 DEPT 10570.000 10545.000 10520.000 10495.000 10470.000 10445.000 10420.000 10395.000 10370.000 10345.000 10320.000 10295.000 200.963 13.023 229.155 43.008 145.811 30.688 200.288 17.178 145.574 6.932 179.329 14.915 151.477 13.381 272.738 15.155 GR RILD 220.142 24.636 244.880 11.986 179.157 6.887 247.134 8.012 285.359 15.601 181.883 14.758 0.000 9.585 0.000 38.952 0.619 17.893 0.000 9.599 0.000 7.520 0.000 6.339 27.761 -999.250 28.997 -999.250 31.106 -999.250 27.233 -999.250 25.107 -999.250 24.452 -999.250 28.761 -999.250 20.102 -999.250 SPD CILD 22.871 -999.250 29.233 -999.250 28.525 -999.250 22.998 -999.250 27.779 -999.250 29.233 -999.250 26.325 -999.250 25.871 -999.250 28.761 -999.250 33.106 -999.250 24.343 -999.250 24.469 -999.250 74.339 14.197 49.758 30.895 48.424 19.009 58.465 16.510 59.749 7.020 58.731 13.743 52.597 11.386 55.873 10.575 SP RILM 50.964 23.066 53.866 9.515 54.398 6.496 56.041 7.130 57.357 13.720 57.986 14.555 60.191 8.955 51.185 48.485 53.063 15.739 46.612 9.485 48.679 7.333 51.010 6.654 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 CHT -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 TEMP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 3023.608 2975.847 3058.400 3056.366 2993.902 3103.624 3073.270 2670.388 TTEN 3224.153 2940.067 3207.188 2930.313 2942.879 3002.887 3147.793 3216.364 3177.489 3067.609 2853.887 2886.193 12.613 25.122 11.573 13.358 6.827 12.432 9.347 12.269 RFOC 24.857 10.141 5.532 7.549 12.976 12.157 9.449 43.092 14.344 5.975 6.983 6.908 10~270.G00 0.000 25.543 47.267 -999.250 -999.250 3128.451 9.031 -999.250 8.822 8.821 10245.000 0.000 30.215 34.735 -999.250 -999.250 2999.806 14.411 -999.250 12.821 15.362 10220.000 0.000 20.073 48.795 -999.250 -999.250 3074.916 11.796 -999.250 9.753 10.227 10195.000 0.802 21.544 40.174 -999.250 -999.250 3250.496 10.255 -999.250 10.651 10.998 10170.000 0.000 25.888 43.863 -999.250 -999.250 3034.300 12.025 -999.250 11.473 9.667 10145.000 0.000 26.526 49.364 -999.250 -999.250 3245.297 6.045 -999.250 6.206 4.551 10120.000 0.000 25.941 49.652 -999.250 -999.250 2886.788 7.331 -999.250 8.140 4.927 10095.000 0.000 28.888 ~ 51.105 -999.250 -999.250 2886.332 6.463 -999.250 5.305 5.989 10070.000 0.012 29.342 43.115 -999.250 -999.250 2967.344 14.822 -999.250 14.205 14.733 10045.000 0.065 28.342 53.309 -999.250 -999.250 2640.882 9.336 -999..250 7.907 6.653 10020.000 0.131 27.233 54.704 -999.250 -999.250 3246.741 9.510 -999.250 8.803 6.106 9995.000 0.000 29.233 55.712 -999.250 -999.250 3023.080 8.587 -999.250 7.822 6.384 9970.000 0.034 32.123 43.523 -999.250 -999.250 2449.670 16.630 -999.250 17.687 23.995 C 12-23 DEPT GR SPD SP CHT TEMP TTEN RILD CILD RILM RFOC 9945.000 159.986 25.596 40.698 -999.250 -999.250 2539.235 14.506 -999.250 14.890 18.231 9920.000 219.683 26.997 51.507 -999.250 -999.250 2969.079 10.274 -999.250 9.609 6.356 9895.000 396.183 31.233 52.111 -999.250 -999.250 2986.139 7.699 -999.250 7.390 5. 132 9870.000 193.409 30.215 54.232 200.000 0.000 2505.665 7.685 0.000 6.666 5.351 9845.000 58.006 47.942 1.272 673.598 0.000 6417.754 14.552 68.720 15.249 14.363 9820.000 51.951 49.437 -27.145 631.310 0.000 6252.672 15.100 66.225 15.435 16.242 9795.000 54.177 50.989 -31.570 602.550 0.000 6227.422 16.283 61.416 17.611 15.742 9'770 · O00 9745.000 9720.000 9695.000 9670.000 9645.000 9620.000 9595.000 9570.000 9545.000 9520.000 9495.000 9470.000 9445.000 9420.000 9395.000 9370.000 9345.000 C 12-23 DEPT 9320.000 9295.000 50.968 13.903 61.051 10.534 94.909 29.561 45.684 25.281 45.343 12.827 50.062 10.830 79.650 16.447 78.511 22.732 96.445 25.244 89.425 26.816 43.449 20.815 60.779 18.643 53.621 23.937 56.407 13.251 74.389 18.796 76.442 25.355 83.497 28.491 70.046 45.973 GR RILD 66.165 41.435 93.864 20.331 50.995 71.929 50.995 94.934 50.437 33.829 50.995 39.556 70.358 77.959 68.993 92.336 69.993 60.800 69.957 43.992 69.993 39.613 70.993 37.292 71.029 48.042 71.587 53.640 71.993 41.776 71.587 75.467 72.023 53.203 71.393 39.441 71.993 35.099 72.957 21.752 SPD CILD 71.581 24.134 72.029 49.186 -37.351 14.661 -3.998 10.867 -7.397 29.640 -23.827 28.152 4.656 14.057 -1. 682 12.755 -10.177 16.442 -16.364 23.011 6.294 22.140 -5.339 25.495 -33.557 21.339 -13.670 17.641 -52.523 25.581 -50.077 14.633 -19.083 17.861 -15.561 24.550 -13.895 21.282 -35.307 31.131 SP RILM -44.107 57.955 -23.845 20.491 627.298 620.718 634.891 657.335 661.426 638.514 632.067 635.521 638.340 626.585 629.435 635.427 620.882 623.948 630.743 642.613 639.987 632.920 CHT 651.559 653.179 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 6216.898 6311.004 6322.109 6358.250 6584.848 6498.250 6440.070 6439.629 6416.086 6334.918 6314.879 6289.687 6260.418 6256.742 6011.570 6191.625 6247.070 6204.375 TTEN 6252.254 6264.859 15.748 10.366 24.468 26.024 17.095 9.687 15.441 19.958 19.920 24.216 21.807 18.448 32. 128 17.578 17.598 15.584 21.083 35.401 RFOC 51.287 17.978 9~70 · 0'00 '9245.000 9220.000 9195.000 9170.000 9145.000 9120.000 9095.000 9070.000 9045.000 9020.000 8995.000 8970.000 8945.000 8920.000 8895.000 8870.000 8845.000 8820.000 8795.000 8770.000 8745.000 83. 21. 42. 22. 51. 19. 61. 12. 47. 25. 51. 21. 58. 23. 66. 15. 55. 22. 59. 18. 65. 14. 95. 17. 90. 19. 70. 25. 86. 35. 97. 22. 88. 17. 91. 16. 53. 15. 73. 13. 51. 56. 47. 17. 136 697 711 621 756 377 232 423 470 438 940 034 475 595 639 199 968 055 393 598 525 826 308 418 381 387 681 865 072 955 374 412 840 663 533 642 051 397 163 659 301 908 604 891 73 46 74 44 74 51 73 80 73 39 72 47 74 42 74 65 74 45 75 53 74 67 75 57 75 51 75 38 76 27 76 44 76 56 76 60 76 64 77 73 77 17 78 55 .957 .090 .592 .206 .957 .608 .551 .497 .993 .312 .987 .541 .592 .383 .993 .795 .993 .342 .987 .769 .957 .447 .551 .413 .028 .580 .216 .663 .399 .813 .586 .618 .992 .616 .992 .088 .992 .946 .180 .214 .992 .572 .586 .895 -23.865 22.568 -55.036 28.482 -56.121 23. 314 -17.937 12.389 -48.951 29.119 -53.448 24.73.1 -55.573 27.168 -41.810 16.567 -50.085 24.617 -46.449 20.664 -33.815 15.681 -22.433 16.667 -27.656 19.150 -26.883 18.431 -27.265 26.800 -20.040 22.078 -12.086 17.897 -11.704 15.291 -63.564 18.584 -21.453 14.582 -26.988 42.277 -55.081 22.573 657.448 636.123 655.708 654.873 643.257 631.057 640.179 646.398 642.609 629.270 670.486 668.286 666.953 660.367 672.772 668.069 657.777 641.911 624.136 628.596 643.388 638.909 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6179.043 6115.504 6120.641 6100.754 6039.852 6031.277 5993.906 5989.113 6008.352 5960.582 6000.383 5978.016 5957.246 5933.289 5928.789 5907.445 5851.383 5879.539 5768.164 5776.367 5735.051 5719.852 18.001 29.430 23.712 12.887 34.554 26.098 25.332 16.960 25.162 17.787 16.649 18.520 16.803 21.111 34.179 16.787 16.427 14.799 22. 189 14.781 49.970 26.337 8 ~/2,0.0~0 0 C 12-23 DEPT 8695.000 8670.000 8645.000 8620.000 8595.000 8570.000 8545.000 8520.000 8495.000 8470.000 8445.000 8420.000 8395.000 8370.000 8345.000 8320.000 8295.000 8270.000 8245.000 43.315 14.962 GR RILD 58.942 16.218 41.803 21.953 105.198 12.724 98.754 24.797 85.819 14.206 46.590 12.913 107.369 14.765 50.873 14.596 48.371 10.051 49.506 8.838 45.253 15.804 45.151 12.226 56.813 13.083 34.731 77.903 42.408 14.514 43.143 10.283 72.763 9.267 72.242 30.010 105.755 14.526 78.398 66.836 SPD CILD 76.998 61.658 78.440 45.552 79.028 78.593 78.992 40.327 79.980 70.391 80.992 77.439 80.992 67.727 81.986 68.514 80.992 99.492 81.992 113.148 81.550 63.275 76.951 81.792 75.405 76.433 75.551 12.836 75.440 68.897 76.028 97.252 77.028 107.913 76.028 33.322 77.992 68.841 -58.951 19.649 SP RILM -39.608 22. 123 -13.770 21.044 -13.126 14.240 -9.167 20.480 -5.829 16.482 -50.586 17.489 -4.322 13.242 -48.507 18.985 -49.592 13.312 -54.838 11.308 -51.622 21.366 -56.937 16.136 -44.940 15.839 -24.253 71.716 20.340 -11.813 9.981 -11.337 -9.291 -22.153 29.155 -15.745 14.524 644.778 CHT 708.358 646.642 658.392 665.441 647.877 632.268 636.423 636.845 636.494 627.920 669.064 636.299 672.575 669.839 696.854 678.446 696.658 686.051 669.381 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5715.730 TTEN 5831.773 5665.937 5646.668 5622.230 5567.242 5507.457 5517.555 5484.281 5478.426 5468.359 5474.762 5393.754 5445.781 5447.535 5410.176 5368.125 5303.867 5359.387 5279.629 25.596 RFOC 22.086 14.144 12.531 14.476 13.885 25.010 13.147 24.091 17.495 15.651 26.228 21.452 18.868 40.005 12.790 9.418 10.286 33.165 11.858 8~2~ o. o,oo 8195.000 8170.000 8145.000 8120.000 8095.000 C 12-23 DEPT 8070.000 8045.000 8020.000 7995.000 7970.000 7945.000 7920.000 7895.000 7870.000 7845.000 7820.000 7795.000 7770.000 7745.000 99.220 13.605 44.213 10.889 56.202 13.297 67.916 11.661 83.595 13.595 38.312 28.964 GR RILD 42.986 41.944 47.211 17.851 48.076 17.082 57.661 60.176 89.292 12.968 56.799 16.916 81.589 14.420 49.659 30.634 55.861 14.950 72.753 16.474 90.292 10.816 100.652 12.632 83.649 18.355 55.358 5.637 77.034 73.500 77.992 91.832 79.428 75.205 79.028 85.753 80.956 73.559 80.998 34.526 SPD CILD 81.986 23.842 82.950 56.020 81.392 58.542 79.440 16.618 82.179 77.110 81.840 59.116 83.027 69.347 83.550 32.644 82.022 66.888 82.992 60.701 84.956. 92.454 84.956 79.163 84.992 54.481 85.392 177.396 -9.476 13.424 -9.494 10.885 -40.204 15.389 -15.034 12.325 -18.784 12.206 -45.390 31.288 SP RILM -52.669 43.795 -48.083 19.853 -43.502 19.995 -30.032 40.413 -24.173 13.684 -32.801 19.948 -19.874 13.757 -52.338 30.048 -41.364 17.975 -28.252 16.654 -7.934 9.163 -11.724 11.912 -1.826 15.971 1.570 5.569 670.637 684.660 657.306 658.474 639.374 653.908 CHT 652.728 664.834 603.859 699.022 648.889 654.648 622.854 648.570 709.285 681.709 649.068 631.367 661.753 709.220 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5274.969 5292.953 5161.891 5209.871 5102.965 5108.582 TTEN 5016.793 4993.711' 5105.391 5159.984 4990.090 5039.684 4932.242 4908.801 4990.828 4979.715 4859.953 4913.836 4848.836 4862.738 12.908 9.841 14.640 11.068 13.985 34.154 RFOC 50.831 21.930 20.713 34.382 11.970 18.676 15.089 32.347 18.564 16.680 9.584 10.487 12.268 6.677 7'-/20.0,00 7695.000 7670.000 7645.000 7620.000 7595.000 7570.000 7545.000 7520.000 7495.000 7470.000 1 C 12-23 DEPT 7445.000 7420.000 7395.000 7370.000 7345.000 7320.000 7295.000 7270.000 7245.000 69.805 7.643 72.933 7.393 88.059 8.591 44.446 16.686 53.435 12.497 62.549 10.789 31.377 72.322 78.858 12.382 82.029 11.413 103.406 15.811 96.867 23.383 GR RILD 102.394 11.304 97.010 8.957 91.820 7.964 44.952 15.302 45.301 14.553 50.842 11.200 61.929 6.620 59.547 17.333 54.005 4.683 78.398 130.831 75.992 135.266 75.992 116.403 75.998 59.932 77.138 80.019 77.363 92.688 75.669 13.827 77.628 80.763 77.992 87.619 77.992 63.247 76.476 42.766 SPD CILD 77.633 88.466 78.428 111.648 80.351 125.566 80.986 65.352 81.538 68.714 81.915 89.284 80.992 151.065 79.404 57.692 80.022 213.523 -6.041 7.501 -7.801 6.771 -7.171 8.255 -12. 155 16.830 -46.965 13.395 -27. 129 11.749 -12.948 269.636 -22.740 11.325 -8.373 10.733 -18.363 13.074 -34.099 16.742 SP RILM -5.332 10.348 7.165 9.045 0.943 7.844 -34.938 18.493 -36.498 17.798 -34.411 13.870 -13.491 6.813 -4.025 14.445 -1.657 4.846 668.260 654.963 682.244 662.797 674.815 658.661 645.503 662.259 642.957 682.088 672.792 CHT 663.483 672.965 634.359 624.747 638.946 632.208 650.462 681.610 666.745 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4853.453 4720.684 4803.379 4707.844 4652.359 4742.953 4709.160 4686.730 4644.523 4671.773 4735.906 TTEN 4603.555 4605.441 4505.520 4474.496 4457.020 4470.219 4484.273 4541.633 4504.457 8.593 6.898 10.174 12.369 12.716 11.957 16.532 11.727 10.072 14.743 22.897 RFOC 8.604 8. 017 8.215 19.223 16.887 12.766 6.995 10.967 5.209 7220.0,00 7195.000 7170.000 7145.000 7120.000 7095.000 7070.000 7045.000 7020.000 6995.000 6970.000 6945.000 6920.000 6895.000 6870.000 6845.000 C 12-23 DEPT 6820.000 6795.000 6770.000 6745.000 41.508 6.802 42.910 6.647 48.488 6.180 47.384 6.818 55.713 6.135 52.880 41.863 51.236 10.436 45.584 9.946 44.473 11.605 64.513 8. 677 97.716 13.986 47.491 17.261 54.647 11.858 85.317 9.567 94.267 14.038 100.694 12.300 GR RILD 64.913 7.847 70.990 6.761 60.608 12.503 66.573 8.255 81.514 147.013 77.769 150.439 75.957 161.800 79.622 146.674 81.392 162.990 84.356 23.887 82.998 95.822 82.591 100.542 83.597 86.172 81.470 115.246 79.769 71.500 84.956 57.935 80.404 84.333 76.622 104.526 79.556 71.237 81.956 81.302 SPD CILD 81.392 127.435 80.392 147.916 80.470 79.981 81.992 121.146 -1.268 6.988 0.621 6.211 0.505 6.827 -0.752 6.987 -4. 388 6.055 -3.960 39.841 -37.897 13.080 -36.762 12.662 -38.186 15.360 -33.138 10.478 -1.050 13.410 -19.853 19.818 -32.222 13.893 -17.662 10.425 -8.143 12.801 -5.003 12.317 SP RILM 1.593 7.660 -1.343 6.906 -8.475 12. 323 -9.636 7.503 665.045 711.051 677.902 652.820 672.592 632.749 633.397 631.867 626.989 646.543 751.054 650.544 642.050 716.871 702.066 719.495 CHT 679.317 689.409 680.178 678.978 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 4447.102 4480.387 4407.543 4402.766 4381.238 4258.988 4247.801 4286.602 4250.488 4296.180 4552.922 4156.566 4128.535 4303.211 4145.539 4143.160 TTEN 4112.551 4119.746 4094.886 4055.866 6.781 6.553 5.795 7.368 8.376 27.366 13.007 14.250 23.582 10.464 11.148 26.480 13.617 7.972 16.241 13.048 RFOC 6.970 6.708 9. 090 7.379 ' DEP~ 6195.000 6170.000 6145.000 6120.000 6095.000 6070.000 6045.000 6020.000 5995.000 5970.000 5945.000 5920.000 5895.000 5870.000 5845.000 5820.000 5795.000 5770.000 5745.000 5720.000 5695.000 GR RILD 44.356 10.906 48.965 11.701 49.661 9.141 66.708 7.275 46.392 18.761 70.436 7.346 86.284 12.533 88.902 11.612 87.992 11.187 83.306 16.715 84.585 7.927 88.183 5.219 91.513 6.805 45.839 14.001 73.990 16.062 83.708 8.561 92.523 10.230 96.511 8.583 102.218 8.040 84.703 7.497 41.992 10.642 SPD CILD 80.586 91.694 78.998 85.461 80.592 109.399 80.028 137.456 82.392 53.302 82.556 136.131 82.033 79.790 80.481 86.120 83.992 89.386 84.021 59.827 83.956 126.148 82.992 191.607 83.992 146.943 84.392 71.423 83.404 62.261 83.422 116.813 82.691 97.756 83.950 116.515 84.579 124.380 84.027 133.390 84.179 93.966 SP RILM -22.849 10.649 -48.213 12.947 -23.854 8.879 -21.182 7. 184 -26.467 22.922 -19.706 7.110 -21.959 12.065 -11.647 11.963 -7.022 11.110 -9.901 15.017 -8.753 8.039 -5.123 5.038 -6.199 6.574 -48.403 17.295 -6.505 19.183 -9.338 7.880 -3.963 10.003 0.461 7.926 3.005 7.472 -3.089 6.841 -31.267 13.225 CHT 638.359 678.472 677.588 670.494 665.149 651.228 654.057 674.446 638.061 642.202 651.837 640.433 647.442 620.696 672.839 670.771 720.237 649.986 644.599 635.700 649.949 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TTEN 3685.709 3794.243 3738.608 3742.082 3639.356 3672.850 3634.844 3683.013 3589.712 3576.463 3580.937 3605.748 3564.605 3542.137 3636.191 3539.235 3629.376 3483.975 3436.320 3473.066 3409.323 RFOC 10.751 11.606 7.973 8.527 12.559 9.571 10.507 9.091 10.359 16.685 7.648 6.012 7.759 19.375 11.788 8.113 9.604 9.279 9.508 7.099 13.604 5,670.000 5645.000 5620.000 5595.000 C 12-23 DEPT 5570.000 5545.000 5520.000 5495.000 5470.000 5445.000 5420.000 5395.000 5370.000 5345.000 5320.000 5295.000 5270.000 5245.000 5220.000 5195.000 41.424 14.929 50.933 18.941 45.772 9.952 54.811 13.859 GR RILD 82.473 10.164 72.212 17.089 40.805 27.588 99.908 9.768 22.047 69.577 97.198 10.435 95.318 7.037 94.724 8.468 86.742 6.877 89.810 6.666 62.032 10.343 66.422 8.120 74.780 5.843 51.628 16.751 43.605 15.593 56.253 33.106 82.585 66.983 80.416 52.797 79.550 100.484 79.550 72.154 SPD CILD 80.028 98.383 81.944 58.518 80.550 36.247 77.227 102.377 78.180 14.373 79.992 95.831 80.627 142.103 81.550 118.088 83.550 145.410 83.956 150.013 82.992 96.682 83.027 123.149 83.834 171.141 83.440 59.698 83.585 64.131 83.027 30.206 -32.443 19.890 -41.973 23.268 -37.646 12.249 -13.454 11.160 SP RILM -12.867 10.012 -32.570 18.590 -13.307 20.044 -10.741 8.801 -25.525 72.561 7.061 10.247 10.089 6.868 7. 676 8.561 7.016 6.295 5.662 6.312 -25.024 11.254 -12. 170 8.270 -0.973 5.820 -40.185 20.962 -46.625 20.303 -18.059 28.825 651.258 618.615 629.769 651.351 CHT 657.677 609.427 647.851 663.276 697.833 686.775 636.213 665.656 628.927 615.266 629.817 647.920 670.466 652.400 633.634 673.237 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3385.052 3362.410 3354.690 3368.613 TTEN 3344.674 3276.271 3313.969 3485.979 3442.002 3367.526 3278.988 3303.934 3193.447 3164.970 3184.759 3200.636 3205.680 3163.011 3171.511 3196.752 24.981 21.728 11.798 14.329 RFOC 10.609 15.194 29.732 9.525 47.968 8.827 7.300 8.726 6.988 7.054 9.965 8.439 8.700 22.724 23.371 52.294 5170. 000 5145.000 5120.000 5095.000 5070.000 5045.000 5020.000 4995.000 4970.000 C 12-23 DEPT 4945.000 4920.000 4895.000 4870.000 4845.000 4820.000 4795.000 4770.000 4745.000 4720.000 4695.000 96. 141 9.898 46.886 10.246 56.831 8.993 66.815 7.982 89.670 7.002 74.089 10.920 81.484 7.045 100.271 10.039 89.560 11.248 GR RILD 80.632 8.757 50.178 10.047 48.061 10.250 48.534 9.916 44.293 12.713 84.714 7.617 48.903 9.072 49.762 5.222 83.790 10.860 57.401 38.023 86.116 11.731 82.962 101.030 83.591 97.597 81.992 111.202 81.440 125.276 82.392 142.824 80.592 91.573 83.027 141.952 83.591 99.615 83.191 88.905 SPD CILD 84.944 114.195 84.992 99.536 82.962 97.562 81.980 100.850 79.986 78.660 80.398 131.285 80.956 110.228 81.544 191.484 81.185 92.081 82.550 26.300 78.962 85.245 -11.945 9.941 -33.067 11.263 -25. 641 9.626 -12.012 7.748 -11.931 6.558 -21.598 12.513 -6.538 6.879 -6.573 9.558 -0.066 11.121 SP RILM -1.656 8.753 -40.390 12.791 -40.671 13.005 -42.564 12.922 -43.724 17.124 -10.219 7.873 -47.184 11.160 -56.207 7.690 -3.354 12.561 -22.320 28.925 -3.848 10.346 674.403 625.824 649.197 661.677 659.465 692.408 655.471 660.315 656.781 CHT 634.602 661.226 685.989 652.050 696.536 662.924 652.677 647.148 768.176 649.225 659.504 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3228.453 3135.594 3134.439 3182.721 3122. 618 3181.860 3109.188 3067.429 3028.394 TTEN 2990.760 3032.397 3045.032 2940.131 2953.329 2975.174 2891.841 2897.733 2879.544 2880.715 2894.648 10.139 10.771 9. 147 8.436 7.303 11.549 7.416 12.173 10.860 RFOC 9.278 14.941 15.699 15.139 18.109 9. 046 18.267 13.748 13.036 32.799 9.753 4,670. 000 4645.000 4620.000 4595.000 4570.000 4545.000 4520.000 4495.000 4470.000 4445.000 4420.000 4395.000 4370.000 4345.000 C 12-23 DEPT 4320.000 4295.000 4270.000 4245.000 4220.000 4195.000 88.818 12.459 88.167 9.629 38.615 18.214 87.521 9.782 68.444 8.101 68.791 9.521 92.667 8.715 86.003 8.754 51.489 5.208 59.646 4.775 67.589 11.573 40.108 24.169 66.784 8.183 70.391 8.516 GR RILD 67.800 8.607 63.703 10.762 61.812 9.631 31.129 57.521 79.185 11.305 81.256 12.859 78.434 80.266 77.622 103.856 78.221 54.904 78.998 102.229 79.357 123.439 78.956 105.032 79.434 114.749 80.586 114.231 80.992 191.998 83.992 209.435 81.956 86.407 81.992 41.376 82.556 122.202 84.992 117.427 SPD CILD 82.556 116.182 82.998 92.917 84.143 103.836' 81.028 17. 385 81.950 88.457 80.992 77.766 -4. 067 12.477 -4.874 8.978 -2. 348 21.849 21.598 9.009 -6.292 8.331 -18.674 13.086 2.731 8.336 0.087 7.741 -62.585 8.145 -57.646 7.638 -16.455 9.529 -8.653 38.371 -0.818 7.785 0.901 8.708 SP RILM 2.843 8. 187 -6.510 10.798 -3.404 8.960 -22.595 110.649 -7. 644 10.517 -3.666 11.960 647.963 643.690 651.657 666.150 693.523 636.954 647.402 659.522 662.675 625.276 650.367 645.490 675.551 659.704 CHT 657.273 654.594 630.918 657.016 657.153 654.401 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 2827.060 2815.910 2845.552 2827.494 2812.375 2798.096 2775.031 2775.894 2756.875 2676.060 2702.463 2687.872 2684.081 2661.465 TTEN 2659.808 2624.681 2601.932 2575.447 2569.385 2549.994 9.310 9.718 13.773 8.749 9.436 11.379 9.020 9.875 15.389 14.100 10.054 12.267 7.567 7.743 RFOC 7.801 9. 149 11.398 78.474 10.048 12.358 4~70.~00 4145.000 4120.000 4095.000 4070.000 4045.000 4020.000 3995.000 3970.000 3945.000 3920.000 3895.000 3870.000 3845.000 3820.000 3795.000 3770.000 3745.000 3720.000 C 12-23 DEPT 3695.000 29.069 80.722 86.316 9.833 60.669 12.119 81.064 8.309 50.917 14.689 37.999 13.924 40.724 14.636 39.672 13.627 52.444 11.815 39.904 18.008 78.850 19.141 18.496 82.904 46.891 6.296 49.887 5.859 56.854 4.750 42.650 9.365 67.920 7.604 26.659 43.828 61.007 3.253 GR RILD 48.080 5.880 80.592 12.388 81.398 101.700 81.992 82.513 81.398 120.346 81.992 68.079 84.992 71.820 83.992 68.325 84.950 73.386 83.591 84.640 84.469 55.532 84.428 52.245 85.356 12.062 85.149 158.844 85.956 170.667 84.743 210.532 81.986 106.776 83.986 131.502 80.980 22.817 80.386 307.451 SPD CILD 80.580 170.081 -4.822 10000.000 4. 176 9.282 -23.816 12.928 -5.038 8. 192 -31.770 15.194 -31.998 14.586 -32.702 16.878 -33.640 15.745 -34.793 13.203 -39.041 19.777 -18.453 16.807 8.046 960.805 24.085 5.860 7.293 5.710 -4.557 4.587 -19.821 9.365 -10.667 7.299 -15.546 69.294 -8. 000 3.202 SP RILM -12.133 5.679 662.847 674.030 665.714 676.782 660.869 666.749 649.122 637.086 667.002 649.696 675.455 679.067 651.595 648.555 669.060 656.871 624.044 662.806 680.392 CHT 673.004 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 2558.742 2587.371 2534.408 2546.899 2471.321 2455.532 2441.103 2422.685 2433.052 2389.700 2445.286 2425.268 2358.228 2349.187 2340.971 2317.258 2258.889 2256.752 2297.235 TTEN 2247.592 90.343 9.321 11.386 9. 175 14.520 15.823 15.383 14.739 13.063 18.096 22.671 49.958 6.034 5.824 5.525 8.906 7.875 40.938 4.435 RFOC 6.113 3'6?0.0.00 3645.000 3620.000 3595.000 3570.000 3545.000 3520.000 3495.000 3470.000 3445.000 3420.000 3395.000 3370.000 3345.000 3320.000 3295.000 3270.000 3245.000 3220.000 3195.000 3170.000 3145.000 60.623 6.862 84.136 16.481 90.643 9.543 65.287 4.849 52.133 7.043 51.511 6.950 45.203 12.544 50.903 6.799 62.414 6.579 76.573 6.063 74.121 10.109 63.392 10.922 76.208 10.075 72.856 11.540 72.259 11.661 72.831 5.392 59.106 6.332 47.032 8.124 47.325 11.827 46.322 10.311 47.926 17.533 46.177 11.053 80. 145. 83. 60. 82. 104. 82. 206. 82. 141. 84. 143. 82. 79. 83. 147. 83. 151. 84. 164. 83. 98. 84. 91. 84. 99. 85. 86. 86. 85. 85. 185. 84. 157. 86. 123. 86. 84. 86. 96. 88. 57. 78. 90. 434 740 027 677 179 792 386 226 404 993 556 88O 069 719 027 079 666 991 986 945 938 921 392 555 362 253 621 653 538 759 149 454. 428 924 398 097 544 556 985 981 391 037 398 471 -15. 6. -19. 20. -20. 9. -23. 7. -27. 7. -35. 14. -15. 6. -15. 6. -16. 5. -16. 9. -18. 10. -20. 10. -18. 10. -20. 10. -13. 7. -22. 11. -22. 9. -27. 17. -15. 10. 836 132 025 864 320 123 516 636 242 133 189 511 154 172 932 407 901 146 495 657 954 383 915 282 180 683 835 136 583 002 243 122 364 756 768 453 681 616 678 960 534 964 953 752 664.901 643.981 666.289 674.644 690.531 640.934 635.784 648.014 642.559 626.039 672.094 679.690 698.852 648.578 639.226 651.635 661.622 644.748 664.819 646.485 641.338 654.463 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2259.145 2189.610 2197.912 2242.605 2220.297 2169.343 2149.021 2137.024 2172.520 2068.257 2169.135 2097.234 2107.415 2004.135 2029.282 2007.982 2073.977 1992.285 2012.356 1984.583 1929.964 1943.137 7.664 11.177 9.380 5.060 7.494 7.830 12.715 6.624 7.924 7.359 9.230 9.707 8.227 10.645 11.800 6.118 7.679 8.582 11.048 10.014 13.732 8.902 3'12.0. O00 3095.000 C 12-23 DEPT 3070.000 3045.000 3020.000 2995.000 2970.000 2945.000 2920.000 2895.000 2870.000 2845.000 2820.000 2795.000 2770.000 2745.000 2720.000 2695.000 2670.000 2645.000 37.613 22.130 48.810 7.916 GR RILD 63.566 7.271 69.832 7.793 62.454 15.473 49.004 6.109 76.575 7.899 21.983 76.248 41.646 13.832 44.159 15.997 42.896 11.167 48.728 10.433 40.356 19.153 54.665 8.550 64.278 6.861 56.896 7.205 60.467 7.126 57.688 6.833 44.570 14.815 49.731 10.417 77.992 45.188 79.508 126.325 SPD CILD 77.491 137.528 79.622 128.317 80.428 64.629 80.392 163.696 78.876 126.597 80.986 13.115 80.633 72.298 81.033 62.511 81.022 89.553 81.986 95.848 82.591 52.211 82.950 116.964 82.422 145.751 84.556 138.797 83.392 140.328 83.550 146.347 85.179 67.499 85.392 95.997 -12.289 23.593 -5.418 6.667 SP RILM -10.103 6.778 -11.092 7.155 -12.117 18.181 -8.372 5.237 -16.452 7.530 -13.148 2434.568 -19.121 15.034 -17.004 14.973 -20.110 11.743 -18.141 10.850 -26.285 19.139 -6.946 8.093 -3.337 6.515 -2.382 7.066 -1.655 6.824 -1.730 6.497 -11.166 17.880 -20.591 10.344 684.828 665.324 CHT 685.220 651.829 644.990 648.422 641.216 638.144 638.345 624.620 654.372 652.840 637.116 661.947 638.237 642.719 638.805 648.016 682.192 639.793 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1955.510 1901.522 TTEN 2010.680 1897.608 1882.426 1884.401 1899.445 1816.651 1784.727 1809.242 1818.002 1804.934 1764.182 1760.412 1768.464 1725. 191 1722.187 1716.695 1677.974 1673.576 24.699 8.082 RFOC 7.663 8.033 14.183 6.726 9.617 45.003 12.760 15.516 11.071 10.651 16.960 8.204 8.259 7.262 7.723 8.067 13.674 9.318 2~6 ~,0. QO0 2595.000 2570.000 2545.000 2520.000 2495.000 2470.000 C 12-23 DEPT 2445.000 2420.000 2395.000 2370.000 2345.000 2320.000 2295.000 2270.000 2245.000 2220.000 2195.000 2170.000 2145.000 63.716 6.451 65.772 7.029 50.732 10.081 45.000 10.405 49.448 9.002 62.392 8.688 61.095 9.143 GR RILD 54.765 12.765 62.567 7.613 65.666 8.363 61.100 7.081 50.786 9.610 48.621 10.817 52.266 11.237 49.461 9.933 45.965 17.077 48.868 10.692 41.939 31.185 47.136 10.498 54.318 7.050 85.956 155.006 84.398 142.270 84.992 99.195 84.992 96.112 85.021 111.091 85.591 115.105 80.028 109.375 SPD CILD 81.986 78.337 81.956 131.355 81.956 119.575 80.998 141.216 83.585 104.055 83.585 92.443 81.577 88.988 83.950 100.673 84.404 58.559 84.556 93.527 83.986 32.067 83.992 95.252 84.550 141.847 -5.893 5.999 -3.490 6.742 -13.967 9.892 -23.882 10.594 -15.582 9.007 -9.139 7.701 -14.764 8.637 SP RILM -12.049 9.258 -7.916 7. 022 -7.983 7.675 -13.406 6.331 -9.375 11.598 -19.709 9.861 -20.295 11.055 -22.335 9.748 -17.657 16.764 -25.153 10.591 -17.032 35.396 -27.619 10.413 -14.742 6.471 659.994 685.256 658.82'1 678.568 650.328 726.087 679.123 CHT 649.372 638.873 639.067 667.808 676.376 647.320 662.833 669.377 627.202 655.316 685.963 706.888 620.295 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1654.428 1709.194 1649.346 1646.910 1627.960 1636.333 1650.878 TTEN 1595.665 1586.307 1581.660 1585.494 1576.888 1529.640 1492.973 1513.756 1511. 618 1475. 140 1502.889 1474.617 1435.969 6.789 9. 144 9.652 9.666 9.293 9.572 9.452 RFOC 12.511 7.982 10.043 7.833 8.965 10.005 9.916 9.634 23.922 10.066 27.294 9.909 6.782 2'120.000 2095.000 2070.000 2045.000 2020.000 1995.000 1970.000 1945.000 1920.000 1895.000 1870.000 1845.000 C 12-23 DEPT 1820.000 1795.000 1770.000 1745.000 1720.000 1695.000 1670.000 1645.000 67.921 6.554 39.852 16.253 42.687 17.496 47.242 12.508 42.880 12.335 55.437 12.455 40.021 11.759 61.306 9.329 47.649 41.724 55.904 9.104 60.918 7.194 58.698 7.841 GR RILD 57.412 15.056 60.358 6.624 33.139 26.672 47.233 12.568 56.944 7.074 60.876 18.893 52.990 9.260 55.761 7.308 84.992 152.581 85.027 61.526 85.585 57.155 84.986 79.949 85.392 81.068 84.445 80.287 86.956 85.039 85.956 107.194 85.591 23.967 85.956 109.840 85.433 139.010 83.591 127.538 SPD CILD 84.986 66.418 85.021 150.971 81.926 37.493 83.392 79.569 81.556 141.353 80.998 52.931 81.986 107.989 81.992 136.830 -12.448 5.615 -15.074 17.189 -36.996 18.060 -33.393 12.349 -34.964 12.421 -33.669 11.443 -16.954 16.533 -16.029 8.789 -19.109 40.212 -13.587 8.183 -12.823 6.541 -16.925 8.413 SP RILM -23.821 16.592 -9.531 5. 676 -10.673 17.428 -18.325 15.036 -10.980 6.996 -20.680 19.972 -7.184 10.374 -8.187 6.392 643.542 667.370 645.301 659.790 666.442 649.427 667.987 658.975 700.720 660.031 659.984 653.361 CHT 654.728 669.001 645.461 633.786 644.278 670.755 644.510 656.647 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TEMP 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1429.156 1444.927 1424. 171 1409.101 1394.614 1414. 140 1398.300 1366.978 1357.794 1341.492 1345.523 1321.128 TTEN 1290.955 1284.306 1281.358 1255.772 1234.200 1251.326 1226.206 1202.420 7.507 19.078 15.830 11.440 11.402 12.464 16.589 8.771 25.142 8.848 7.697 8.064 RFOC 11.768 7.019 19.015 10.099 8. 093 15.998 9. 171 7.271 000 57. 104 81. 033 -3. 270 3.658 273.409 3.166 1595. 000 63 . 124 81. 992 -9. 393 6.716 148.902 6.021 1570.000 50.798 83.027 -13.578 9.828 101.751 9.930 1545.000 63.288 84.544 -4.448 7.060 141.636 6.485 1520.000 58.481 83.992 -4.772 8.070 123.922 7.650 1495.000 53.407 84.398 -2.917 9.432 106.025 9.259 1470.000 60.447 84.997 -10.409 8.640 115.743 8.727 1445.000 55.685 87.392 -2.279 9.437 105.968 8.460 1420.000 53.262 85.991 -38.962 5.626 177.734 5.154 1395.000 57.541 85.591 -19.098 32.743 30.541 32.216 1370.000 27.490 0.000 -209.712 0.200 0.000 0.200 1350.000 -999.2 -999.2 WELL DATA FILE: ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 50 -999.250 -999.250 50 -999.250 -999.250 C: \WDSDATA\W04366. WDF 4366.00 SHELL WESTERN EXP. C 12 - 23 9650.000 10900.000 0.500 660.036 630.673 654.153 666.652 609.754 615.669 635.378 637.846 644.583 648.231 200.000 -999.250 & PRO 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -999.250 1218. 100 1205. 813 1178.347 1157.708 1153.022 1147. 321 1131.309 1124.440 1117.107 1105.914 0.000 -999.250 5.530 8.654 9. 177 7.304 7.379 8.900 8.528 7.708 5.552 6.388 0.200 -999.250 NUMBER OF CURVES: 13 DEPTH AC ACQ RILD RILM SP CAL CHT SPD TTEN CILD GR RFOC FILE:MAIN .002 FILE INTERVAL: START= 10900.000 END= 9650.000 DEPT GR SPD TTEN AC 10900.~00 10875.000 10850.000 10825.000 10800.000 10775.000 10750.000 10725.000 10700.000 10675.000 10650.000 10625.000 10600.000 10575.000 10550.000 10525.000 10500.000 10475.000 10450.000 10425.000 10400.000 10375.000 10350.000 10325.000 10300.000 10275.000 10250.000 10225.000 10200.000 10175.000 10150.000 10125.000 10100.000 -999.250 0.000 0.000 45.117 56.155 64.085 50.417 46.948 94.566 54.707 66.637 51.890 92.953 44.123 41.685 49.206 53.118 67.973 86.583 58.216 51.342 59.125 60.182 39.986 62.244 80.951 58.516 50.665 54.747 79.105 42.717 41.930 56.633 -999.250 34.997 34.997 34.997 34.997 35.342 34.997 34.997 35.996 34.997 38.996 38.232 38.996 36.996 37.996 38.996 39.996 39.996 39.996 39.996 39.996 39.996 39.996 39.996 40.232 39.996 39.996 39.996 39.996 38.996 39.996 39.996 39.996 -999.250 6746.301 6876.855 6717.156 6922.945 6683.457 6728.727 6869.551 6709.840 6599.133 6701.266 6456.422 6445.922 7158.254 6588.449 6487.629 6549.434 6454.504 6630.566 6416.137 6391.492 6375.973 6417.562 6303.305 6254.871 6229.879 62'16.129 6316.648 6252.414 6229.395 6177.148 5992.520 6113.277 -999.250 50.000 68.o17 63.846 70.422 66.809 76.237 72.181 65.590 69.193 70.036 78.284 101.431 68.855 69.324 70.017 81.504 69.687 68.911 71.391 71. 194 75.751 107.289 67.584 74.963 82.585 71.847 105.872 73.848 71.456 68.342 72.207 78.593 100~5.O00 51.230 .10050.000 42.378 10025.000 45.269 10000.000 45.968 9975.000 51.870 9950.000 42.046 9925.000 39.754 9900.000 40.048 9875.000 45.942 9850.000 43.142 9825.000 32.554 9800.000 36.492 9775.000 32.894 9750.000 29.815 9725.000 47.678 9700.000 35.255 9675.000 0.000 40.887 5949.121 40.887 5984.082 40.760 5941.570 40.996 5854.410 41.105 5899.148 41.341 5780.535 41.232 5860.945 41.651 5837.195 41.887 5799.008 41.996 5720.789 52.742 5744.238 49.995 5739.730 49.995 5677.934 49.995 5690.832 49.995 5676.832 0.000 2000.000 0.000 2000.000 70.433 72.616 72.449 73.577 69.524 73.709 75.534 68.481 70.952 68.576 74.820 77.523 52.681 51.481 68.715 84.160 50.000 C 12 - 23 DEPT GR SPD TTEN AC 9650.000 -999.250 -999.250 -999.250 -999.250 9650.000 -999.250 -999.250 -999.250 -999.250 WELL DATA FILE ECC COMPANY NAME: WELL NAME: FIELD: LOCATION: : C: \WDSDATA\W04365.WDF : 4365.00 SHELL WESTERN E & P, MGS C 12 - 23 9820.000 11850.000 0.500 Top of Well: Bottom of Well: Level Spacing: NUMBER OF CURVES: 21 DEPTH CAL CHT CN CNC GR K KTH LSN RFOC SPD SSN TH TTEN U ' INC CNRA RILD CORR RILM DEN SP FILE:MAIN .003 FILE INTERVAL: START= 11850.000 END= 9820.000 DEPT 11850.000 11825.000 11800.000 11775.000 11750.000 11725.000 11700.000 11675.000 11650.000 11625.000 11600.000 11575.000 11550.000 11525.000 11500.000 11475.000 11450.000 11425.000 11400.000 GR CAL CHT TTEN CNC DEN CORR CNRA -999.250 -999.250 -999.250 -999.250 0.000 -15.000 0.000 -15.000 126.939 17.578 60.494 27.570 184.612 24.727 97.528 12.659 89.679 12.301 66.381 7.164 67.007 9.260 76.382 9.654 156.037 19.282 80.091 7.620 99.148 8.541 138.235 -15.000 478.036 -15.000 137.811 -999.250 165.931 -999.250 -999.250 -999.250 -999.250 -999.250 6.000 1.650 13.237 2.563 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -0.500 -999.250 -999.250 -999.250 0.321 -999.250 15.930 -999.250 -999.250 2.461 0.127 0.621 15.948 -999.250 -999.250 2.362 0.155 0.853 13.801 2.529 0.000 4000.000 0.271 0.778 14.840 90.381 2694.243 2.509 0.110 0.495 11.941 138.597 2941.849 2.541 0.085 0.467 8.722 112.376 2886.817 2.569 0.091 0.341 7.934 127.338 3068.334 2.577 0.097 0.394 9.245 91.813 3150.036 2.518 0.133 0.418 11.572 150.875 2649.881 2.493 0.224 0.665 10.180 153.661 2689.798 2.557 0.123 0.361 9.065 133.836 2740.653 2.548 0.101 0.380 8.848 91.853 2692.944 2.567 0.083 0.000 9.518 125.807 2831.168 2.547 0.080 0.000 8.147 -1196.116 2103.560 2.503 0.067 0.000 10.368 2.467 146.463 3093.013 0.067 0.000 LSN -999.250 -999.250 0.000 0.000 113.988 63.865 78.311 163.216 181.625 373.949 240.470 248.717 112.130 320.235 308.957 5. 172 2.272 10. 174 4.395 SSN -999.250 -999.250 0.000 0.000 283.344 217.949 243.624 323.235 339.313 509.760 379.164 415.905 298.080 462.006 469.588 0.000 0.000 0.006 0.000 CN -999.250 -999.250 0.000 0.000 17.711 28.906 25.178 11.764 10.459 4.780 7.130 8.208 19.757 5.644 6.495 6.815 0.000 -999.250 -999.250 1137~5.0~)0 11350.000 485.647 -999.250 125.040 -999.250 11325.000 126.122 -999.250 11300.000 158.373 -999.250 11275.000 132.038 -999.250 11250.000 126.756 -999.250 MGS C 12 - 23 DEPT GR CNC 11225.000 132.923 -999.250 11200.000 133.319 9.545 11175.000 118.450 16.803 11150.000 157.873 16.038 11125.000 164.883 30.490 11100.000 151.289 12.549 11075.000 123.471 18.753 11050.000 130.119 29.942 11025.000 218.478 30.836 11000.000 150.925 14.210 10975.000 170.953 18.159 10950.000 232.572 24.658 10925.000 172.771 22.271 10900.000 111.406 28.964 12.143 2.540 12.180 2.540 11.009 2.606 11.789 2.624 14.077 2.438 13.458 2.566 CAL DEN 15.017 2.528 16.141 2.544 19.033 2.480 20.000 2.605 18.944 2.369 10.461 2.530 14.161 2.456 21.629 2.236 18.527 2.304 9.594 2.501 19.146 2.474 18.215 2.370 18.465 2.142 21.057 2.409 123.980 0.196 114.717 0.090 135.287 0.091 78.384 0.130 74.352 0.131 81.809 0.099 CHT CORR 131.641 0.060 168.082 0.073 94.935 0. 193 171.838 0.228 184.945 0. 146 179.241 0.070 183.573 0. 121 245.877 0. 105 383.456 0.253 393.328 0.075 291.663 0.263 233.251 0.213 406.710 0.333 274.529 0.258 3030.300 0.000 3244.064 0.000 3105.380 0.000 3255.756 0.000 3389.588 0.000 3020.429 0.000 TTEN CNRA 2661.408 0.000 3286.618 0.419 3447.927 0.617 3094.804 0.602 2961.173 0.930 2964.324 0.459 3136.786 0.641 3012.210 0.933 3126.650 0.935 3024.421 0.487 2659.013 0.651 2982.680 0.801 3133.850 0.747 2975.191 0.910 0. 625 1.667 10.581 5.375 16.261 0.711 LSN 0.187 269.711 90.543 139.182 57.751 209.140 93.483 40.435 46.228 198.007 79.941 64.206 72.282 46.252 0.000 0.000 0.000 0.000 0.000 0.000 SSN 0.000 452.316 223.477 335.406 214.841 383.614 239.845 150.936 172.845 385.784 208.230 205.675 215.946 168.392 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 CN -999.250 -999.250 17.504 16.814 32.906 10.066 18.658 33.079 33.162 11.390 19.121 26.305 23.686 31.848 108775.0~00 10850.000 10825.000 10800.000 10775.000 10750.000 10725.000 10700.000 10675.000 10650.000 10625.000 MGS C 12 - DEPT 10600.000 10575.000 10550.000 10525.000 10500.000 10475.000 10450.000 10425.000 10400.000 257.323 30.351 254.045 21.963 249.801 17.637 3536.994 22.341 258.651 11.875 240.168 16.663 218.748 17.059 175.808 23.481 203.012 16. 012 232.702 6.926 171.404 19.188 23 GR CNC 222.514 26.443 233.131 9.853 199.865 20.509 125.557 17.377 216.464 28.633 291. 612 27.928 960.545 18.823 0.000 19.933 0.000 23.199 18.286 2.534 18.900 2.138 18.589 2.477 17.777 2.497 17.009 2.507 17.502 2.487 21.581 2.468 18.938 2.402 17.706 2.570 16.324 2.481 20.165 2.523 CAL DEN 16.628 2.513 11.868 2.522 15.464 2.465 18.814 2.435 17.450 2.512 16.854 2.493 16.629 2.467 17.120 2.482 12.923 2.220 316.061 0.167 325.712 0.190 181.219 0. 127 247.746 0.120 243.651 0.218 266.973 0.144 253.451 0.274 219.907 0. 083 202.586 0.079 408.505 0.106 287.139 0.278 CHT CORR 288.322 0.158 321.311 0.055 307.656 0.235 315.071 0.170 220.475 0.178 218.578 0.127 221.198 0.124 355.408 0.077 234.199 -0.010 2812.176 0.924 2990.093 0.742 3160.711 0.636 3017.175 0.745 2487.012 0.483 2972.709 0.606 2964.214 0.636 3145.577 0.778 3014.369 0.591 3068.266 0.348 3081.109 0.682 TTEN CNRA 3038.911 0.832 2960.393 0.406 2856.251 0.690 3083.276 0.630 3137.584 0.884 3009.141 0.866 3010.068 0.655 3184.882 0.684 3052.768 0.734 59.113 81.951 112. 044 85.617 210.165 146.796 90.148 76.131 132.761 250.244 79.111 LSN 67.962 249.993 71.141 104.321 63.553 69.765 113.590 102.085 88.549 218.429 243.205 284.859 255.097 406.407 356.030 229.301 236.835 313.924 348.118 215.712 SSN 226.236 405.715 196.245 262.998 224.698 241.591 297.611 279.394 259.956 32.571 23.447 18.382 23.590 11.220 16.997 18.396 25.177 16.279 5.082 20.569 CN 27.856 7.649 20.947 18.129 30.475 29.543 19.302 20.690 23.064 10-37,9.04)0 10350.000 10325.000 10300.000 10275.000 10250.000 10225.000 10200.000 10175.000 10150.000 10125.000 10100.000 10075.000 10050.000 10025.000 10000.000 1 MGS C 12 - DEPT 9975.000 9950.000 9925.000 9900.000 0.000 18.554 0.000 27.460 1.481 13.670 0.000 30.335 0.000 35.918 0.000 15.020 0.000 71.326 0.000 18.084 0.000 26.512 0.000 18.017 0.000 19.943 0.000 21.565 0.000 14.180 0.422 16.274 0.000 19.297 0.038 18.904 23 GR CNC 0.475 11.585 163.798 18.848 171.448 24.285 191.721 24.402 15 2 15 2 16 2 15 2 16 2 12 2 12 1 10 2 14 2 20 2 20 2 16 2 12 2 10 2 18 2 18 2 .189 .464 .596 .333 .529 .529 .880 .447 .108 .397 .608 .492 .228 .754 .634 .621 .831 .507 .816 .507 .110 .489 .216 .490 .586 .556 .929 .538 .056 .560 .510 .523 CAL DEN 11.395 2.527 8.576 2.472 16.273 2.491 22.150 2.554 275.463 0.188 241.205 0.108 333.500 0.113 248.064 0. 132 357.617 0.197 304.706 0.109 -508.983 0.085 246.777 0.218 331.273 0.310 339.232 0.225 181.747 0.066 315. 688 0.100 570.198 0.142 216.001 0.231 253.269 0.231 283.381 0.168 CHT CORR 242.793 0.113 53141.453 0.189 167.242 5.704 315.610 0.291 3142.907 0.642 3109.839 0.849 3150.526 0. 527 2995.33'6 0.911 3364.954 1.017 2982.583 0.539 2623.575 1.389 2980.805 0.589 2863.072 0.824 2705.210 0.656 2893.050 0.700 2959.897 0.718 2938.465 0.518 2916.098 0.550 3243.392 0.674 3100.862 0.666 TTEN CNRA 3006.485 0.444 3247.245 0.573 2965.576 0.782 2874.568 0.817 90.532 68.665 150.988 61.638 45.995 147.813 24.302 142.330 66.739 95.873 88.349 87.438 147.409 136.944 83.597 82.032 LSN 212.457 119.425 53.795 48.931 232.317 233.156 318.485 224.552 187.139 318.634 135.031 335.132 219.998 251.593 247.320 251.275 305.715 301.533 225.241 218.635 SSN 377.575 273.696 168.245 159.816 18.663 28.691 13.273 31.879 37.858 13.817 70.954 16.162 27.452 19.352 21.433 22.321 12.858 14.361 20.185 19.838 CN 9.408 15.420 25.379 27.078 9S-7~5~. {~00 210. 051 17. 652 265. 628 18.130 2.583 0.344 9850.000 215.431 36.244 9825.000 -999.250 -999.250 9820.000 -999.250 -999.250 WELL DATA FILE: ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: NUMBER OF CURVES: 21 9.367 187.789 2.265 -1.006 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 C: \WDSDATA\W04364. 4364.00 WDF SHELL WESTERN EXP. C 12 - 23 11440.000 11820.000 0.500 DEPTH CAL CHT CN CNC GR K KTH LSN RFOC SPD SSN TH TTEN U 2825.358 0.643 2872.887 0.951 -999.250 -999.250 -999.250 -999.250 & PRO 78.819 56.088 -999.250 -999.250 CNRA CORR RILD RILM 202.771 213.406 -999.250 -999.250 DEN SP 18.740 34.061 -999.250 -999.250 FILE: MAIN .004 FILE INTERVAL: START= 11820.000 END= 11440.000 DEPT GR KTH TH K U 11820.000 -999.250 -999.250 -999.250 -999.250 -999.250 11795.000 0.000 0.000 0.000 0.000 -5.000 11770.000 0.000 0.000 0.000 0.000 -5.000 11745.000 129.239 81.610 37.900 0.067 5.605 11720.000 60.454 34.245 6.993 0.280 3.030 11695.000 176.200 65.249 15.589 0.455 12.756 11670.000 91.206 13.289 5.333 0.084 9.588 11645.000 81.222 24.947 8.432 0.086 5.606 11620.000 68.736 18.294 1.656 0.238 6.276 11595.000 66.829 17.793 4.812 0.122 5.982 11570.000 76.086 7.533 3.386 0.000 7.809 11545.000 104.065 55.798 10.651 0.513 5.797 11520.000 101.620 11495.000 78.699 11470.000 0.000 11445.000 -999.250 11440.000 -999.250 WELL DATA FILE: ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 101.620 48.344 0.073 0.246 78.699 37.470 -0.009 0.220 0.000 0.000 0.075 0.291 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 C:\WDSDATA\W04361.WDF 4361.00 SHELL WESTERN EXP. C 12 - 23 1350.000 1620.000 0.500 & PRO NUMBER OF CURVES: DEPTH AC RILD RILM TEMP TTEN 18 ACQ CAL CHT SP SPD TlR1 CILD TlR2 GR T2R1 RFOC T2R2 FILE:REPEAT.005 FILE INTERVAL: START= 1620. 000 END= 1350.000 DEPT GR SPD SP RILD CILD RILM 1620.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 1595.000 0.000 77.337 -10.524 0.200 0.000 7.242 1570.000 49.913 83.882 -16.977 9.621 103.937 9.526 1545.000 68.267 84.756 -7.009 7.066 141.513 6.67'7 1520.000 63.054 84.992 -5.438 7.342 136.197 7.044 1495.000 64.095 84.992 -6.368 8.121 123.137 7.934 1470.000 55.337 85.991 -13.105 8.493 117.738 8.612 1445.000 49.822 86.227 -6.416 9.379 106.616 9.294 CHT -999.250 636.156 637.168 639.959 620.850 634.539 615.539 634.011 TEMP -999.250 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TTEN -999.250 1192.102 1177.523 1139.181 1114.206 1114.010 1103.447 1089.621 RFOC -999.250 9.435 9.328 7.118 7.490 7.602 8.397 9.027 1420.000 62.592 86.991 '~ 6.026 165.944 -41.780 5.447 1395.000 42.002 82.756 -58.903 1.217 822.013 1.607 1370.000 30.812 0.000 0.200 0.000 -80.000 0.200 1350.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 End of execution: Mon Elapsed execution time = SYSTEM RETURN CODE = 0 4 JUN 90 1 minute , 635.468 643.242 200.000 -999.250 2:50pm 20.2 seconds. 0.000 0.000 0.000 -999.250 1089.885 1068.612 0.000 -999.250 5.691 7. 132 0.200 -999.250