From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: Not Operable: MPI-02 (PTD# 1900910) - Well to Remain Shut In
Date:Thursday, May 8, 2025 7:40:16 AM
From: Ryan Thompson <Ryan.Thompson@hilcorp.com>
Sent: Wednesday, May 7, 2025 3:38 PM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Taylor Wellman <twellman@hilcorp.com>
Subject: Not Operable: MPI-02 (PTD# 1900910) - Well to Remain Shut In
Mr. Wallace –
PWI injector MPI-02 (PTD# 1900910) had an injectivity test performed with fullbore on
5/5/25, showing a lack of injectivity to bring the well back on injection.
Injection in the well has not commenced since the Operable note below on 2/21/25
therefore no online AOGCC MIT-IA has been performed.
The well will now return to Not Operable status until further wellwork is performed to
increase well injectivity.
Please respond with any questions or concerns.
Thank you,
Milne / Islands / WNS Well Integrity Engineer
907-564-5005
Ryan Thompson
From: Ryan Thompson
Sent: Friday, February 21, 2025 8:26 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Taylor Wellman <twellman@hilcorp.com>
Subject: Operable: MPI-02 (PTD# 1900910) - Return to PWI Injection
Mr. Wallace –
PWI well MPI-02 was made Not Operable after being shut in for its 4 year MIT-IA due in
March 2023. We will be returning this well to PWI injection.
The well is now re-classified as Operable.
Plan forward:
1. POI
2. Perform state witnessed MIT-IA once on stable injection.
Please respond with any questions or concerns.
Thank you,
Ryan Thompson
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: Operable: MPI-02 (PTD# 1900910) - Return to PWI Injection
Date:Monday, February 24, 2025 8:57:40 AM
From: Ryan Thompson <Ryan.Thompson@hilcorp.com>
Sent: Friday, February 21, 2025 8:26 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: Taylor Wellman <twellman@hilcorp.com>
Subject: Operable: MPI-02 (PTD# 1900910) - Return to PWI Injection
Mr. Wallace –
PWI well MPI-02 was made Not Operable after being shut in for its 4 year MIT-IA due in
March 2023. We will be returning this well to PWI injection.
The well is now re-classified as Operable.
Plan forward:
1. POI
2. Perform state witnessed MIT-IA once on stable injection.
Please respond with any questions or concerns.
Thank you,
Ryan Thompson
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system.
Do not click links or open attachments unless you recognize the sender and know
the content is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: MPI-02 (PTD# 190-091) Missed AOGCC Witness MIT-IA
Date:Tuesday, April 4, 2023 9:06:49 AM
From: Jerimiah Galloway <Jerimiah.Galloway@hilcorp.com>
Sent: Sunday, April 2, 2023 2:40 PM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov>
Cc: David Haakinson <dhaakinson@hilcorp.com>
Subject: NOT OPERABLE: MPI-02 (PTD# 190-091) Missed AOGCC Witness MIT-IA
Mr. Wallace,
Produced Water Injector MPI-02 (PTD#190-091) is currently shut in and will not be brought online
for its scheduled MIT-IA. The well is now classified as NOT OPERABLE and will remain shut in. A
witnessed MIT-IA will be scheduled once the well is returned to injection.
Please respond with any comments or concerns.
Jerimiah Galloway
MPU/Islands Well Integrity Engineer
Email: jerimiah.galloway@hilcorp.com
O: (907)564-5005
C: (828)553-2537
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
To: Jim Regg •�7 p�
P.I. Supervisor Il —y� 3'ZG,I�C'
DATE: Friday, March 22, 2019
SUBJECT: Mechanical Integrity Tests
I '
HILCORP ALASKA LLC
FROM: Lou Laubenstein
Petroleum Inspector
I-02
MILNE PT UNIT 402
Sre: Inspector
Reviewed By: �
P.1. Supry Zluz=�
NON -CONFIDENTIAL Comm
Well Name MILNH PT UNIT 1-02 API Well Number 50-029-22066-00-00 Inspector Name: Lou Laubenstein
Insp Num: mitLOL190316160852 Permit Number: 190-091-0 Inspection Date: 3/16/2019
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well oz P w 4Ty� San "Tubing 083 oas - oso - oso
PTD 900910 ' Type Test sPT 'Test psi soo IA 498 696 1650 1638
BBL Pumped. i BBL Returned OA 4 41- sa -
Interval avRTST 'P/F P
Notes:
Friday, March 22, 2019 Page 1 of I
STATE OF ALASKA
ALARA OIL AND GAS CONSERVATION COM SION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon LJ Plug Perforations LI Fracture Stimulate U Pull Tubing Li Operations shutdown LJ
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other:MBE Treatment 0
2.Operator 4.Well Class Before Work: 5.Permit to Drill Number:
Name: Hilcorp Alaska LLC Development ❑ Exploratory ❑ 190-091
3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic❑ Service ❑✓ 6.API Number:
AK 99503 50-029-22066-00-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0025906 MILNE PT UNIT SB 1-02
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
N/A MILNE POINT/SCHRADER BLUFF OIL
11.Present Well Condition Summary:
Total Depth measured 6,260 feet Plugs measured 6,138 RECEIVED
true vertical 4,308 feet Junk measured 6,133 feet
5,680,5,853& JUL 2 0 2017
Effective Depth measured 6,133 feet Packer measured 5,960 feet
3,875,4,007& AOGCC
'true vertical 4,217 feet true vertical 4,088 feet
Casing Length Size MD TVD Burst Collapse
Conductor 106' 13-3/8" 106' 106' 3,730psi 1,130psi
Surface 2,800' 9-5/8" 2,800' 2,385' 3,520psi 2,020psi
Production 6,260' 7" 6,260' 4,312' 7,240psi 5,410psi
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
2-3/8"(Long) 4.6/L-80/IBT 5,984' 4,106'
Tubing(size,grade,measured and true vertical depth) 2-3/8"(Short) 4.6/L-80/IBT 5,879' 4,027'
GT Dual x(2)
Packers and SSSV(type,measured and true vertical depth) &FH N/A See Above N/A
12.Stimulation or cement squeeze summary: N/A
Intervals treated(measured): N/A C
Treatment descriptions including volumes used and final pressure: N/A SCANNED AUG 16 2017
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 0 0 0 0
Subsequent to operation: 0 0 0 0 0
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 2 Exploratory❑ Development❑ Service Q Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 0 Gas ❑ WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ Q WAG ❑ GINJ ❑ SUSP❑ SPLUG❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
316-408
cle
Authorized Name: Bo York Contact Name: Stan Porhola
Authorized Title: Operations Manager Contact Email: sporhola@hilCOrp.COm
Authorized Signature: /7"-------------.. Dab 7/20/2017 Contact Phone: 777-8412
Form 10-404 Revised 4/2017 �'"""B/4- 7
St - ] RBDMS t ,L 1 7 2017 Submit Original Only
•
• •
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name Rig API Number Well Permit Number Start Date End Date
MP 1-02 Pump Truck 50-029-22066-00-00 190 091 9/23/16 2/6/17
Daily Operations:
9/21/2016-Wednesday
No activity to report. c j`
9/22/2016 -Thursday
No activity to report. --
9/23/2016- Friday
MIRU Cement Pump Unit and Little Red Pump Unit on Short String. PT lines to 3,500 psi -test OK. Perform injectivity test at
0.40 bpm @ 1,350 psi. Mix and up mp 10 bbl of HEC, 15 bbl of 15.8 ppg cement, and 5 bbl of HEC. Drop foam ball. Displace
w/ 12.0 bbl of 1% KCI water. Switch to Little Red Pump Unit and pump 10 bbl of diesel. SD Pumps. Monitor well. Final SITP
of 1,300 psi. Move to Long String. RU on Long String. PT lines to 3,500 psi -test OK. Perform injectivity test at 0.60 bpm @
1,280 psi. Mix and pump 10 bbl of HEC, 15 bbl of 15.8 ppg cement, and 5 bbl of HEC. Drop foam ball. Displace w/ 12.0 bbl
of 1% KCI water. Switch to Little Red Pump Unit and pump 10 bbl of diesel. SD Pumps. Monitor well. Final SITP of 1,190 psi.
RDMO Cement Pump Unit & Little Red Pump Unit. Rig Down.
9/24/2016-Saturday
No activity to report.
9/25/2016-Sunday
No activity to report.
9/26/2016 - Monday
No activity to report.
9/27/2016-Tuesday
No activity to report.
• S S
Hilcorp Alaska, LLC
Hilcorp Alaska,LEX Weekly Operations Summary
Well Name Rig API Number Well Permit Number Start Date End Date
MPI-02 Coil 50-029-22066-00-00 190-091 9/23/2016 2/6/2017
i �a
7-Wen-say Q , 61 rftigtir
0111
No Operations to Report.
2/2/17-Thursday
No Operations to Report.
2/3/17-Friday
No Operations to Report.
2/4/17-Saturday
No Operations to Report.
2/5/17-Sunday
Move support equipment from J-24 to I-02.,HES CTU arrive with AMU#1. Hold safety meeting. Discuss job procedure and review JSA. MIRU CTU.,Start
BOPE test. Test all rams and valves to 250/3500 psi. Draw down test accumulators. BOPE test complete. Pop off well stack back injector head. Install
night cap.
2/6/17-Monday = W
Hold safety meeting. Discuss job procedure. Pick inj head. Stab 20' lubricator. Make up dimple coil connector. 1.5"OD,DFCV 1.7",G force Jars
1.69"OD,Disconnect 1.69"OD,Circ Sub 1.69"OD,X treme mudd motor 1.7"OD,Reverse clutch 3 blade Junk mill 1.74"OD, Total BHA length18.14' (PT
MHA 250/3500,Pull test connector 25k) Stab on well. PT stack 250/3500 psi.,Bleed down to 500 psi. Open master and swab on short string. Fusible cap
installed on SSV. WHP 350 psi. IA=O,OA=0 psi. Bleed down WHP open choke. Returns at surface. RIH, Wt check at 5630'13.8K, RIH wt-600 lbs.
5805'wt check 15k.,5960' Start pumping bottoms up 1 bbl/min 4500 psi. Pumped 12 bbls. Annular Velocity in 2.375"=595'. Shut down pump. RIH at
10 ft/min 5940'stack 5k down.pick up online 1 bbl/min down CT 4000 psi. RIH not indication of motor work. Clean out to Max depth in short string 5961'
slight tag on packer. Plck up and re tag dry. Gel sweep at nozzle. Pump bottoms up. Returns look grey and black.,POOH to surface. Tagged up.
Pumped 84 bbls for short string FCO. Online down back side with freeze protect at.25 bbls/min 1100 psi. Spoke with engineer. Changed injection
rates. Attempted to inject via pressure vs.rate. Shut down pump. Wellhead leveled off at 950 psi.,Short string freeze protected from surface to 2500'.
Close master and swab. Blow down stack. Pop off well. Break down tools. Baker tool hand wants to install new motor. Make up new motor and re
install mill. Same BHA configuration in description above. Swap tree cap to long string. Stab on well. Low pt stack 250/3500 psi.,RIH, at min rate.4
bbls/min 679 psi. Increase rate 1 bbl/min and FCO to tubing tail. Stacked weight and stalled motor in xn nipple 5976'. Pick up and CIH. pump bottoms
up at tubing tail at 5984'. Weight check in tubing tail prior to 7"entry 19K. Small motor work. Doesnt look to be cement. More Gooey than hard.
Stacking-7k and motor still spinning. Milled to 6008'and HES stated out of fluid.,Pick up and pump bottoms up. Gel at nozzle. 31k wt check. PU to
5900'and finish bottoms up. Trickle in 60/40 meth. Waiting on Vac truck with more fluid.Fluid tracker on shows pumped 200 bbls of stage volume of 1
KCL.Continue to creep OOH 1.5 ft/min.;Vac truck on location. Pulled 200 bbls off return tank. Should have been at least 260 in return tank. Vac truck
pull off upright that was suppose to be out of fluid. pulled 65 bbls. Upright was not out of fluid. Investigate why HES was unable to pull from tank. 1700•
2000 NPT on HES. Vac truck on location with 1%KCL.;Hook up truck circulate KCL to Mill.. RIH attempt dry tag. Clear sailing from 5900-6100'. Plck up
to 6000'and start puming 1 bbl/min 4000 psi. Cleanout to 6100'. 10 bbl gel sweep at nozzle. Chase OOH at 20 ft/min in 7". Increase POOH speed in
tubing tail to 110 ft/min. 3000'shut donw fluid pump. Circulate 23 bbls of 60/40 in coil for freeze protect. Online down back side for freeze protect of
tubing;Tagged up at suface. Close choke. Pump.25 bbls/min injecting at 1073 psi for 3 bbls. Good flat line. Close master swab. Dump SSV. Blow down
stack. Rig down injector head,p sub and flowback iron. Unit still spotted up to well. Install tree cap. Location Secure. Crews off location.
2/7/17 ii=4Tuesday
. 11 0 • Mime PointMP102 Unit
We
l SCHEMATIC Last Completed: 10/18/2002
Hileorp Alaska,LLC PTD: 190-091
TREE&WELLHEAD
Tree 2-3/8"- 5M Dual
Orig.KB Elev.=68.50/Orig.GL Elev.=35.00 11"x 2-3/8"5M FMC Dual w/2.375"IBT T&B Thread
Wellhead FMC Tubing Hanger 2.0"CIW"H"BPV Profile
13-3/8"At:, 1 OPEN HOLE/CEMENT DETAIL
13-3/8" 500 sx Permafrost C in a 30"Hole
9-5/8" 938 sx PF'E',254 sx'E',in a 12-1/4"Hole
7" 391 sx Class`G'in a 8-1/2"
WELL INCLINATION DETAIL
KOP @ 500'
Max hole angle=69 deg.at 4,023'MD
Hole angle thru perfs=41 deg at 6,100'MD
9-5/8" ag 1 ii CASING DETAIL
A Size Type Wt/Grade/Conn ID Drift Top Btm BPF
13-3/8" Conductor 54.5/K-55/N/A 12.615" 12.459" Surface 106' 0.1545
9-5/8" Surface 36/K-55/BTC 8.921" 8.765" Surface 2,800' 0.0773
7" Production 26/L-80/BTC 6.276" 6.151" Surface 6,260' 0.0383
TUBING DETAIL
2-3/8" Tubing(Long) 4.6/L-80/IBT 1.995" 1.901" Surf 5,984' 0.0039
2-3/8" Tubing(Short) 4.6/L-80/IBT 1.995" 1.901" Surf 5,879' 0.0039
TUBING DETAIL
No Top Depth Item
LONG STRING
1 2,278' HES 2-3/8"'X'Nipple,ID=1.875"
2 5,660' HES 2-3/8"'X'Nipple,ID=1.875"
TOC:4,000 3 5,680' Baker Model'GT'Retrievable Dual Packer 40K Shear
4 5,853' Baker Model'GT'Retrievable Dual Packer 40K Shear
5 5,960' Baker FH Packer 40K ROT Release
.4 RA Tag:
5036' 6 5,976' 2-3/8"'XN'Nipple 1.795"No Go
7 5,984' 2-3/8"Cut Tubing
TOC 5,450 8 6,130' Dropped Baker Model'E'Hydro-Trip Sub/Mule Shoe
USIT 10/16/02 SHORT STRING
(No log above) B
Y� 2 . A 2,281' HES 2-3/8"'X'Nipple,ID=1.875"
B 5,659' HES 2-3/8"'X'Nipple,ID=1.875"
C 5,680' Baker Model'GT'Retrievable Dual Packer 40K Shear
C ( ?w 3 D 5,853' Baker Model'GT'Retrievable Dual Packer 40K Shear
Z. -� 'yam
E 5,867' 2-3/8"'XN'Nipple 1.795"No Go
N Sands F 5,868' 2-3/8"WLEG—Bottom @ 5,879'
D 4 PERFORATION DETAIL
MnimumlD ELII Sands Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT SPF Size Date Status
1.795"@5,867' 5,710' 5,722' 3,896' 3,905' 12 12 3.5" 2/15/1991 Open
F ONG STRING 5,742' 5,758' 3,920' 3,932' 16 12 3.5" 2/15/1991 Open
"op of Cement N
OA Sands X6,100'CTM 5,775' 5,782' 3,945' 3,951' 7 12 3.5" 2/15/1991 Open
Milled 2/06/17 5,803' 5,826' 3,955' 3,973' 23 12 3.5" 2/15/1991 Open
OA 5,898' 5,940' 4,038' 4,069' 42 5 5.0" 2/01/1991 Open
5
Minimum ID= ` =' i OB 5,982' 6,018' 4,101' 4,129' 36 5 5.0" 2/01/1991 Open
1.795"@5,976 Ref Log:SLB GCT—1/30/1991—Perf Guns 5.0"/37 gram 5 spf;Perf Guns 3.5"/24 gram 12 spf
6 �a
) , a
OB Sands ` ' "' 7 ' , GENERAL WELL INFO
-ish:Tubing Tail API:50-029-22066-00-00 STIMULATION DETAIL
X6,133' Drilled&Cased by Nabors 27E—11/05/1990 OA/OB:Frac w/82,72644 16/20 Carbolite
Fish:1.75"Ball Frac Pack ESP Completion by EWS Rig—2/18/1991
@6,138' a 8 Pull&Replace ESP by EWS Rig-12/21/1991 NOTE:
7 '0lir- 1 ,, . Pull&Run ESPCP by Nabors 4ES—3/08/1995 7"Casing Repaired in 2002.
•
Pull&Replace ESPCP by Polar 1—6/23/1996
TD(MD)=6,260'/ TD(TVD)=4,308' Pull&Run ESP by Nabors 5S—3/16/1998
PBTD(MD)=6,138'/PBTD(TVD)=4,293' Pull&Replace ESP by Nabors 4ES—4/06/2001
Convert to Injector by Nabors 4ES—10/18/2002
Cut long-string tubing tail—8/19/2009
Revised By:STP 7/20/2017
� OFTJi • •
• re I'/7;4.ct THE STATE Alaska Oil and Gas
; Of TAS Conservation Commission
� � AL
}# 333 West Seventh Avenue
Anchorage, Alaska 99501-3572
rR., GOVERNOR BILL WALKER g
Main: 907.279.1433
O4'ALAS Fax: 907.276.7542
www.aogcc.alaska.gov
Bo York
Area Operations Manager
Hilcorp Alaska, Inc. SCANNED JAN 1 3 2017
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Milne Point Field, Schrader Bluff Oil Pool, MPU SB I-02
Permit to Drill Number: 190-091
Sundry Number: 316-408
Dear Mr. York:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
A
Cathy P oerster
Chair
DATED this /6137 of August, 2016.
RBDMS'I,L/ AUG 1 5 2016
e • RECEIVED
• STATE OF ALASKA AUGALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS ars $//' 6
20 AAC 25.280 O
1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing 0 Other: MBE Treatment❑., /
2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number.
Hilcorp Alaska LLC • Exploratory ❑ Development 0 190-091 I
3.Address: 3800 Centerpoint Dr,Suite 1400Stratigraphic 0 Service 0, 6.API Number.
Anchorage Alaska 99503 50-029-22066-00-00 '
7.If perforating: 8.Well Name and Number
What Regulation or Conservation Order governs well spacing in this pool? C.O. 477.05 '
Will planned perforations require a spacing exception? Yes ❑ No ❑✓ / MILNE PT UNIT SBI-02 '
9.Property Designation(Lease Number): 10.Field/Pool(s):
ADL0025906 " MILNE POINT/SCHRADER BLUFF OIL •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
6,260' 4,308' 6,133' 4,217' 3,500 6,138' 6,133' ,
Casing Length Size MD TVD Burst Collapse
Conductor 106' 13-3/8" 106' 106' 3,730psi 1,130psi
Surface 2,800' 9-5/8" 2,800' 2,385' 3,520psi 2,020psi
Production 6,260' 7" 6,260' 4,312' 7,240psi 5,410psi
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
2-3/8"(Long) 4.6/L-80/IBT 5,984'
See Attached Schematic / See Attached Schematic 2-3/8"(Short) 4.6/L-80/IBT 5,879'
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): i
GT Dual Pkr,GT Dual Pkr&FH Pkr and N/A 5,680(MD)/3,875(TVD),5,853(MD)/4,007(TVD)&5,960(MDY 4,088(TVD)and N/A
12.Attachments: Proposal Summary ❑✓ Wellbore schematic Q 13.Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑✓ Exploratory 0 Stratigraphic ❑ Development❑ Service 0
14.Estimated Date for 15.Well Status after proposed work:
8/20/2016
Commencing Operations: OIL ❑ WINJ Q v WDSPL 0 Suspended El
16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR El SPLUG ❑
Commission Representative: GINJ 0 Op Shutdown ❑ Abandoned ❑
17. I hereby certify that the foregoing is true and the procedure approved
herein will not be deviated from without prior written approval. Contact Stan Porhola SIP
Email sDorholat hilcorp.com
Printed Name Bo York Title Operations Manager
Signature A Phone 777-8345 Date 8/2/2016
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number.Ce: I `
V
Plug Integrity 0 BOP Test Mechanical Integrity Test 0 Location Clearance ❑ /
Other: 3560 p S 4 ,•' 'd--)10 °T5 f- EC:r4'
111 )
Post Initial Injection MIT Req'd? Yes 0 No 0
Spacing Exception Required? Yes ❑ Nod Subsequent Form Required: /4 / 0: Li
it' I� 1
t� L.:_ 5 2016
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date: g -/ -J
D4cJ � Submit Form and
.F.fC"SY„ t
Form 10-403 Revised 11/2015 for 12 months from the date of approval. Attachments in Duplicate
•
Well Prognosis
Well: MPU 1-02
Hibor!Alaska,LI)
Date:8/01/2016
Well Name: MPU 1-02 API Number: 50-029-22066-00
Current Status: SI Dual Water Injector Pad: Milne Point I-Pad
Estimated Start Date: August 20th, 2016 Rig: N/A
Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd:
Regulatory Contact: Tom Fouts Permit to Drill Number: 190-091
First Call Engineer: Stan Porhola (907) 777-8412 (0) (907) 331-8228 (M)
Second Call Engineer: Paul Chan (907) 777-8333 (0) (907) 444-2881 (M)
AFE Number:
Current Bottom Hole Pressure: 2,793 psi @ 4,000' TVD (Last BHP measured 3/25/2014)
Maximum Expected BHP: 2,793 psi @ 4,000' TVD (No new perfs being added, EMW= 13.43 ppg)
MPSP: 3,500 psi (Based on maximum surface injection pressure)
Brief Well Summary:
MPU 1-02 was drilled with Nabors #27E in 1990 as a deviated producer in the Schrader Bluff NA, NB,
NC, NE, OA, and OB sands. The well was first brought online using an ESP in March 1991. The ESP was changed
out using EWS #4 in December 1991, Nabors 4ES in March 1995, Polar #1 in June 1996, Nabors 5S in March
1998, and Nabors 4ES in April 2001.
The well was converted to a dual string injector using Nabors 4ES in October 2002. A hole was found in
the 7" production casing during the workover and the casing was cut at 476' and recovered the cut joint and
backed off and recovered the cut joint. New 7" casing was ran and made up to the existing casing and tested to
3,000 psi.The tubing tail of the long-string was cut in August 2009.
The well provides support in hydraulic unit 3 for the OA sand (Short-string) and the OB sand (Long-
string) for offset producers MPU H-16 (PTD 204-190), MPU I-04A (PTD 201-092), and MPU 1-15 (PTD 202-152).
Notes Regarding Wellbore Condition
• Dual String Injector(Short-string= OA sand; Long-string = OB sand).
• Well is a deviated dual-string water injector (max hole angle 69.5° @ 4,000').
• Last MIT-IA to 1,500 psi on 3/12/2015.
• Shut-in water injection due to diagnosed MBE (Matrix Bypass Event).
• Confirmed MBE between MPU H-16 (ESP Oil Producer) based on dye tests in the OA and OB sands.
Objective:
The purpose of this work/sundry is to pump MBE treatments (down both the Long String [OB sand] and the
Short String(OA sand])and place the well back on water injection for both strings.
Brief Procedure: // j$ (a,/tr f °a
Pumping Procedure (STEPS#1-#30 to be completed for both Long&Short Strings):
1. Production to SI offset producers up to 5 days prior to treatment (H-16, I-04A, 1-15).
2. Production to SI offset injectors up to 2 days prior to treatment (H-04& H-15).
3. MIRU Cement Pumping Unit and Little Red Pumping Unit. PT lines to 3,500 psi. [TREATMENT#1]
• •
Well Prognosis
Well: MPU 1-02
Hilcorp Alaska,LLQ Date:8/01/2016
a. Setup fluid manifold to allowing switching over from Cement Unit to Little Red.
4. Perform injectivity test w/8.5 ppg fresh water.
a. Inject at 1.0 bpm or a max 1,000 psi for injectivity test. Do not exceed 1,250 psi.
5. Mix and bullhead the following fluids with the Cementing Unit:
a. +/- 10 bbl of 100 ppt HEC (hydroxy ethyl cellulose) lead spacer pill.
b. +/- 15 bbl of 15.8 ppg acid soluble cement.
c. +/-5 bbl of 100 ppt HEC(hydroxy ethyl cellulose)tail spacer pill.
d. Drop foam ball.
6. Mix and bullhead the following fluids with the Little Red Pumping Unit:
a. +/- 12.0 bbl of 1% KCL water.
b. +/- 10.0 bbl of diesel (freeze protection).
i. Volumes above will over-displace cement into formation by 1.0 bbl.
ii. Injection pressure may be increased to prevent leaving cement in tubing.
7. SD Pumps. Monitor wellhead pressures for 15 min (T/I/0).
8. RDMO Cement Pumping Unit and Little Red Pumping Unit.
9. WOC 48 hours.
10. MIRU Little Red Pumping Unit. PT lines to 3,500 psi. [INJECTIVITY TEST#1]
11. Mix and bullhead the following fluids:
a. +/-5 bbl of 60/40 McOH/Water(to ensure injectivity).
b. +/-40 bbl of 8.5 ppg sea water or until injection rate stabilizes (same rate as injectivity test).
c. ***Contingency*** If unable to establish injectivity.
i. Increase injection pressure, do not exceed 1,250 psi.
d. +/- 10 bbl of 60/40 McOH/Water(freeze protection; after stable injection achieved).
12. RDMO Little Red Pumping Unit.
13. Contingency: If unable to establish injectivity:
a. MIRU Slickline. PT lubricator to 3,500 psi Hi 250 psi Low.
b. RIH and tag cement top. POOH. /
c. RIH and bail cement. POOH.
d. RIH w/dump bailer and spot 15% HCI acid to dissolve cement in tubing.
e. Wait on acid minimum 4 hours(to dissolve calcium carbonate based cement).
f. RIH and bail cement. POOH.
g. RD Slickline.
14. Contingency: If residual cement exists:
a. MIRU Coiled Tubing Unit and spot ancillary equipment. Fill source tank w/8.5 ppg seawater.
b. Pressure test BOPE to 3,500 psi Hi 250 psi Low, 10 min each test.
i. Notify AOGCC 24 hrs.
ii. Test using 60/40 methanol or 8.5 ppg seawater.
iii. Each subsequent test of the lubricator will be to 3,500 psi Hi 250 psi Low to confirm no leaks.
c. RIH w/1.50" coil w/1.50" wash nozzle to cement top.Circulate well w/8.5 ppg seawater.
d. Continue to RIH and cleanout cement to+/-5,960' MD(SS-Pkr)or+/- 6,133' MD (LS-Fish).
e. RU to test injectivity thru the tubing tail. Do not exceed 3,500 psi. POOH.
15. Contingency: If unable to cleanout cement w/wash nozzle.
a. RIH w/1.75" OD mill, 1-11/16" motor, and oil jars and cleanout cement to+/-5,960' MD (SS-Pkr)or
+/-6,133' MD(LS-Fish).
b. RU to test injectivity thru the tubing tail. Do not exceed 3,500 psi. POOH.
16. Contingency: If able to cleanout cement but unable to establish injectivity.
a. RIH w/ 1.75" wash nozzle to+/-5,960' MD (SS-Pkr)or+/-6,133' MD (LS-Fish).
. 13
• •
Well Prognosis
Well: MPU 1-02
Hikcorp Alaska,LU Date:8/01/2016
b. RU acid pumping unit. RU lines to pump down coil tubing. PT lines to 3,500 psi.
c. Mix and pump 5-10 bbl of 15% HCI acid. Displace acid w/8.5 ppg seawater. POOH.
d. RD acid pumping unit. RU return lines to acid returns tank.
e. Wait on acid minimum 4 hours (to dissolve calcium carbonate based cement).
f. Circulate acid out of well pumping 8.5 ppg seawater.
g. RU to test injectivity thru the tubing tail. Do not exceed 3,500 psi. POOH.
17. Contingency: If unable to establish injectivity test after HCI soak, repeat Step#16[a-g].
18. MIRU Cement Pumping Unit. PT lines to 3,500 psi. [TREATMENT#2]
19. MIRU Little Red Pumping Unit. PT lines to 3,500 psi.
20. Fluid-pack and maintain tubing pressure on offset well saffected by MBE (H-16/I-04A/I-15).
21. Mix and bullhead the following fluids with the Cementing Unit:
a. +/-5 bbl of 100 ppt HEC(hydroxy ethyl cellulose) lead spacer pill.
b. +/- 10 bbl of 15.8 ppg acid soluble cement.
c. +/-5 bbl of 100 ppt HEC(hydroxy ethyl cellulose)tail spacer pill.
d. Drop foam ball.
22. Mix and bullhead the following fluids with the Little Red Pumping Unit:
a. +/- 12.0 bbl of 1% KCL water.
b. +/- 10.0 bbl of diesel (freeze protection).
i. Volumes above will over-displace cement into formation by 1.0 bbl.
ii. Injection pressure may be increased to prevent leaving cement in tubing.
23. Discontinue maintaining tubing pressure on offset well affected by MBE (H-16/I-04A/I-15).
24. SD Pumps. Monitor wellhead pressures for 15 min (T/I/0).
25. RDMO Cement Pumping Unit and Little Red Pumping Unit.
26. WOC 48 hours.
27. MIRU Little Red Pumping Unit. PT lines to 3,500 psi. [INJECTIVITY TEST#2]
28. Mix and bullhead the following fluids:
a. +/-5 bbl of 60/40 McOH/Water(to ensure injectivity).
b. +/-40 bbl of 8.5 ppg sea water or until injection rate stabilizes(same rate as injectivity test).
c. ***Contingency*** If unable to establish injectivity.
i. Increase injection pressure, do not exceed 1,250 psi.
d. +/- 10 bbl of 60/40 McOH/Water(freeze protection; after stable injection achieved).
29. RDMO Little Red Pumping Unit.
30. Turn well over to production.
Attachments:
1. As-built Schematic
2. Coil BOPE Schematic
3. Fluid Flow Diagram-Acidizing
• 4) Milne
Well: Point MP 1-02Unit
SCHEMATIC Last Completed: 10/18/2002
flacon)Ala k��,f,t�. PTD: 190-091
TREE&WELLHEAD
Tree 2-3/8"- 5M Dual
Orig.KB Elev.=68.50/Orig.GL Elev.=35.00 11"x 2-3/8"5M FMC Dual w/2.375"IBT T&B Thread
Wellhead FMC Tubing Hanger 2.0"CIW"H"BPV Profile
13-3/8 ` -'. OPEN HOLE/CEMENT DETAIL
13-3/8" 500 sx Permafrost C in a 30"Hole
9-5/8" 938 sx PF`E',254 sx'E',in a 12-1/4"Hole
7" 391 sx Class'G'in a 8-1/2"
WELL INCLINATION DETAIL
KOP @ 500'
Max hole angle=69 deg.at 4,023'MD
Hole angle thru penis=41 deg at 6,100'MD
9-5/8" ,, ii' CASING DETAIL
.<1
A' Size Type Wt/Grade/Conn ID Drift Top Btm BPF
13-3/8" Conductor 54.5/K-55/N/A 12.615" 12.459" Surface 106' 0.1545
9-5/8" Surface 36/K-55/BTC 8.921" 8.765" Surface 2,800' 0.0773
7" Production 26/L-80/BTC 6.276" 6.151" Surface 6,260' 0.0383
TUBING DETAIL
2-3/8" Tubing(Long) 4.6/L-80/IBT 1.995" 1.901" Surf 5,984' 0.0039
2-3/8" Tubing(Short) 4.6/L-80/IBT 1.995" 1.901" Surf 5,879' 0.0039
TUBING DETAIL
No Top Depth Item
LONG STRING
) 1 2,278' HES 2-3/8"'X'Nipple
2 5,660' HES 2-3/8"'X'Nipple
TOC:4,000 = 3 5,680' Baker Model'GT'Retrievable Dual Packer 40K Shear
(Estlrraterq -
4 5,853' Baker Model'GT'Retrievable Dual Packer 40K Shear
5 5,960' Baker FH Packer 40K ROT Release
CE 6 5,976' 2-3/8"'XN'Nipple 1.795"No Go
7 5,984' 2-3/8"Cut Tubing
TOO 5,450' r
8 6,130' Dropped Baker Model'E'Hydro-Trip Sub/Mule Shoe
USlT10/16/02 .' SHORT STRING
I
(tel'g ) 4 B'' - 2Y*)., A 2,281' HES 2-3/8"'X'Nipple
B 5,659' HES 2-3/8"'X'Nipple
=0? C 5,680' Baker Model'GT'Retrievable Dual Packer 40KShear
C` — D 5,853' Baker Model'Gr Retrievable Dual Packer 40K Shear
s ,3 E 5,867' 2-3/8"'XN'Nipple 1.795"No Go
N Sands F 5,868' 2-3/8"WLEG—Bottom @ 5,879'
D °'4 PERFORATION DETAIL
' Sands Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT SPF Size Date Status
MnimumlD= �` E ` /�1/(�
1.795"@5,867 �; 'i'
,„=+ i�" 5,710' 5,722' 3,896' 3,905' 12 12 3.5" 2/15/1991 Open
F �� N 5,742' 5,758' 3,920' 3,932' 16 12 3.5" 2/15/1991 Open
Sands tit4 (4 5,775' 5,782' 3,945' 3,951' 7 12 3.5" 2/15/1991 Open
PA5,803' 5,826' 3,955' 3,973' , 23 12 3.5" 2/15/1991 Open
OA 5,898' 5,940' 4,038' 4,069' 42 5 5.0" 2/01/1991 Open
Mnimumllk 5l OB 5,982' 6,018' 4,101' 4,129' 36 5 5.0" 2/01/1991 Open
1.795"@5,976' � iRef Log:SLB GCT—1/30/1991—Perf Guns 5.0"/37 gram 5 spf;Perf Guns 3.5"/24 gram 12 spf
It 6
f.iii OB Sands 7 ; GENERAL WELL INFO
-F Feh Tubing Tail API:50-029-22066-00-00 STIMULATION DETAIL
@6,133 Drilled&Cased by Nabors 27E—11/05/1990 OA/OB:Frac w/82,7264 16/20 Carbolite
Fish:1.75"Ball ': -%, , Frac Pack ESP Completion by EWS Rig—2/18/1991
@6,138' i. 8 Pull&Replace ESP by EWS Rig—12/21/1991
,' NOTE:
Y j , Pull&Run ESPCP by Nabors 4ES-3/08/1995
7 •
Pull&Replace ESPCP by Polar 1-6/23/1996 7"Casing Repaired in 2002.
TD(MD)=6,260'/ TD(TVD)=4,308' Pull&Run ESP by Nabors 5S—3/16/1998
PBTD(MD)=6,138'/PBTD(TVD)=4,293' Pull&Replace ESP by Nabors 4ES—4/06/2001
Convert to Injector by Nabors 4E5—10/18/2002
Cut long-string tubing tail-8/19/2009
Revised By:STP 8/01/2016
• •
, IIMilne Point Unit
COIL BOPE MPU I-02
7/21/2016
fIhM1p.Ala4a.LU,
MPU 1-02
13% X 9% X 7 X 2%(Dual) 1 's
Coil Tubing BOP Lubricator to injection
head
, 0
al l
1,______J
1.50"Single Stripper
I I
1J•��I Blind/Shear ®`1/16 10 —Blind/Shear, 7
'.LLIBIind/Shearr -Nisi
=4
Blind/Shear
44
,O0
—__ Slip Slip ,�,'.
sm "`1
1'•'.',) Pipe =— Pipe 1111471 �s -
Crossover spool e_
4 1/16 10M X4 1/16 5M iimi
St vi
Pump-In Sub
41/16 5M I ' ;: IIIiffl
1502 Union
A i i
Manual Gate Manual Gate
Crossover spool 2 1/8 5M 2 1/8 5M
4 1/16 5M X2 3/8 5M 6 4 1 `
p=
Alai
i' —lig
Valve,Swab,WKM-M, ' , .�,
2 3/8 5M FE(Long-String) � � h
� ,,/ Valve,Swab,WKM-M,
III I.11 2 3/8 5M FE(Short-String)
°'roc\ .�1=IIII II _-'c'
S
a5ailI....1i,,,e,‘,1\,.. (11 om - I: 'L''\
illnino
Valve,Upper Master,Baker, iplik
OO Valve,Upper Master,Baker,
2 3/8 5M FE,w/Hydraulic •IF
s • 2 3/8 5M FE,w/Hydraulic
(Long-String)
El' (Short-String)
Valve,Lower Master,WKM-M, ON
2 3/8 5M FE(long String) (.i,
\*/''' � Valve, Lower Master,WKM-M,
�� ' " 2 3/8 5M FE(Short-String)
.w. w4 CrIJ
11.a�wwr.
air
Tubing Adapter,11 x 7 lit�iMMOMMININIM
psi
x23/8dual 5M --=
S
0
1 I-
I2 re
S-
m .3-
• • Ti
a ok 0 ..:::•••. E "'",, --'" O
a
r=4 0 -,; E 7,1
et
E
•
:or 2 gc ' :•:::••••
R Lucc w= .: ''
1 i I
16 r ....._
—
IIXZZO
Loi ......
i--
IN 4.,,,,j
..,....
.--
te)-.
.”,
no. ... ..
0 I
,..-••
z ....:
< --;
ez • .-,
> m
••• Z 0 ..."'' ;,,,
¢ .... < :".% L,'_, •- `>' u 2 --g 5
• : :
a... _ •,,.. -: > cD 0:1 c.: a.
45-0-141/111 —101..;
f ;
o -si f
I 4 g
1, .' ..,..
Mill
IIIIN,
,•
7 A .E
a.
4 4 .
1 u u 5 a i•77 .-- ,.'J-
___ in gm ini mi ,-----i--- = AI
E....-7 :71 I 11 mum* 0 /liwiim .4- 41.011i -4101
a _f_ •'''
1111 III IIII IIII
DODO 1 i i w
NJ Z ,..
9
iLI! <
i
..... :-. ..-. .. Ce 0.
U. I-
0 o 0 0
0 .
7
4
d
2
2
co
8
LA
04
4
e-
I.
4
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg31?-01\ 15 DATE: Tuesday,March 17,2015
P.I.Supervisor ( SUBJECT: Mechanical Integrity Tests s
l-IILCORP ALASKA LLC
1-02
FROM: Bob Noble MILNE PT UNIT SB I-02
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name MILNE PT UNIT SB 1-02 API Well Number 50-029-22066-00-00 Inspector Name: Bob Noble
Permit Number: 190-091-0 Inspection Date: 3/12/2015
Insp Num: mitRCN150312160654
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 1-02 Type Inj W• TVD 4001 • Tubing 759 763 • 766 - 766
PTD 1900910 - Type Test SPT Test psi 1500 IA 104 1815 1748 - 1745
Interval!4YRTST IP/F l P '' OA � 12 17- 18 18 -
Notes:
I`i��1rt 3 .t
sopa
Tuesday,March 17,2015 Page 1 of 1
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
i qO ~' I~ [ File Number of Well History File PAGES TO DELETE
RESCAN
[] Color items - Pages:
[] Grayscale, halftones, pictures, graphs, charts-
Pages:
[] Poor Quality Original - Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
Complete
COMMENTS:
Scanned by: ~ Bren Vincent Nathan Lowell
D TO RE-SCAN
Date:~c ~' 02 Is' ~
Notes:
Re-Scanned by: Beverly Bren Vincent Nathan Lowell
Date: ~si
NOTScanned.wpd
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, March 14, 2011
TO: Jim Regg 251 11
P.I. Supervisor C SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
I -02
FROM: Jeff Jones MILNE PT UNIT SB 1 -02
Petroleum Inspector
Src: Inspector
Reviewed B;
P.I. Supry J
NON - CONFIDENTIAL Comm
Well Name: MILNE PT UNIT SB 1 -02 , API Well Number: 50- 029 - 22066 -00 -00 Inspector Name: Jeff Jones
Insp Num: mitJJ110314070613 Permit Number: 190 -091 -0 Inspection Date: 3/12/2011
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well 1-02 Type Inj. W 1 TVD 3873 ' IA 60 1790 ' 1760 1750 '
P.T.DI 1900910 , TypeTest SPT Test psi 1500 , OA 30 30 30
Interval 4YRTST - p/Ii P - Tubing 900 900 900 900
Notes: 1.2 BBLS methanol pumped. 1 well inspected; no exceptions noted.
_, , MAR 0 MI
Monday, March 14, 2011 Page 1 of 1
~
~
~`$ ~ ~ ~=y~ ~ ~ . ~ ~ , ~ ~ ~~`~~ ~ ~~`~.~ ~ ,~i" a.~ ~ °,
~ ~ ~ ~; ~ ~ ~ ~
~ ~~~ ~ ~ 4'~ ~~~ ~ ~ ~ ~ ~ ~ ~ ~~~ ~~ ~ ~ SEAN PARNELL, GOVERNOR
~~e ~ ~ ~..~ ~ ~.~:,~ ~ ~ a a t ~ a ., , , ~~ ~ ~ fi
~~,~ ~~s~ ~ H ~~ ~~ „~n ~ } ~ R ~ ~ a=A~i~. `~~ ~„Y F.~ _ ~ ~
~
ALAS~ Du A1~TD ~S ~
COI~TSERQATIOI~T CO1~II~IISSIOI~T ~~ 333 W. 7th AVENUE, SUITE 100
~ ANCHORAGE, ALASKA 99501-3539
~' PHONE (907) 279-1433
; FAX (907) 276-7542
Mr. Keith Lopez
Well Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
~o~l
~~b
Re: Milne Point, Schrader Bluff Oil Pool MPI-02
Sundry Number: 309-328
°, „*::~~ ~ ^~tzr;r~
~ n ,__ ._ r~ ,
Dear Mr. Lopez:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
~ Chair
h
DATED this 2Zday of September 2009
Encl.
STATE OF ALASKA
ALAS L AND GAS CONSERVATION COMMISSI~
APPLICATION FOR SUNDRY APPROVALS
~n nnr ~~ ~nn
1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Re-enter Suspertded Well ^'
Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate Q. Other ^ S~Cify:
Change approved program ^ Pull Tubing ^ Perforate New Pool ^ Time Extension ^
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), Inc. Development ~ Exploratory ~ 190-0910 ~
3. Address: P.O. Box 196612 5tratigraphic ~ Service ~. 6. API Number:
Anchorage, AK 99519-6612 50-029-22066-00-00 .
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: /,,p
MPI-02 ~~+ Jo ~
Spacing Exception Required? Yes ^ No ^
9. Property Designation (Lease Number): 10. Field/Pool(s):
ADLO-025906 • MILNE POINT Field / SCHRADER BLUFF OIL Pooi •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Totai Depth ND (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured):
6260 ' 4312.35 ~ 6221 4283 NONE NONE
Casing Length Size MD ND Burst Collapse
Structural
Conductor 71 13-3/8" 54.4# K-55 SURFACE 106 SURFACE 106 2730 1130
Surtace
Intermediate 2765 9-5/8" 36# K-55 SURFACE 2800 SURFACE 2384 3520 2020
Production 6186 7" 26# L-80 SURFACE 6221 SURFACE 4283 7240 5410
Liner
Perforation Depth MD (ft): Pertoration Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
SEE ATTACHED - - 2-7/8" 6.5# L-80 SURFACE - 5424'
Packers and SSSV Tvpe: 7" OTIS AWD SUMP PKR Packers and SSSV MD and ND (ftl: 5863' 4015'
7" OTIS VST VERSA-TRIEVE 5517' 3751'
12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work:
Detailed Operations Program ~ BOP Sketch ^ Exploratory ^ Development ~ Service ^~ r
14. Estimated Date for 15. Weli Status after proposed work:
Commencing Operations: 9/21/2009 Oil ^ Gas ^ WDSPL ~ Plugged ^
16. Verbal Approval: Date: WINJ ^~ • GINJ ^ WAG ^ Abandoned ^
Commission Representative: GSTOR ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact KEITH LOPEZ
Printed Name EITH LOPEZ Title WELL ENGINEER
Signature Phone Date
564-5718 9/15/2009 Prepared by Gary Preble 564-4944
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~9J~ f~~
Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^
Other.
Subsequent Form Required:
~ O "
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date: Z 2
"~~F ~~? ~~~.. ~ ~a~ ~j~ t3~ ~ ~. /G-~ i
~- ~ ~ - ~=~~~~ ~ R ~ G I !~ A L ~~ ~ ,1~, ~~~~~
Form 10-403 Revised 07/2009 ~~ ~/~~~ Submit in Duplicate
M PI-02
190-091
PFRF oTT~4CHMENT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPI-02 2/19/91 PER 5,710. 5,722. 3,898.4 3,907.55
MPI-02 2/19/91 PER 5,742. 5,758. 3,922.78 3,934.96
MPI-02 2/19/91 PER 5,775. 5,782. 3,947.89 3,953.21
MPI-02 2/19/91 PER 5,803. 5,826. 3,969.16 3,986.6
MPI-02 2/19/91 PER 5,898. 5,940. 4,041.02 4,072.64
MPI-02 2/19/91 PER 5,982. 6,018. 4,104.21 4,131.22
MPI-02 10/17/02 STC 5,677. 5,849. 3,873.22 4,004.02
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
, . • •
~~
To:
From:
BP Exploration Alaska
Milne Point
Jerry Sharp/Mark O'Malley
MPU Well Operations Supervisor
Keith Lopez
Tract 14 Engineer
Subject: MPI-02LS Acid 5timulation
Date: 9/ 14/09
IOR: 50 bopd
AFE: MSIPDWL02
COST: $ l OK
Cate ory Ste Descri tion
F 1 Pum Acid Job
WELL INFO:
1. Well status: Both strings on water injection.
2. Minimum I.D.:
a. SS: 1.791".at 5867'MD - 2-3/8" HES XN nipple
b. LS: 1.791" at 5976'MD - 2-3/8" HES XN nipple
c. LS: Fish (tubing tail) @ 6007' MD
3. Pressure:
a. LS: 2135 psi @ 4000' TVDss (3/16/07)
b. SS: 2056 psi @ 4000'TVDss (3/15/07)
4. Maximum wellbore angle through tubing is 69 deg at 4023'MD
5. Hole angle through perfs: 41 deg
6. Last downhole ops: LS tag after tubing tail cut @ 6007' MD on 8/19/09
7. Last PBTD tag: LS 6007' on 8/19/09
OBJECTIVES:
Pump acid down the LS to stimulate the OB zone and increase injectivity. .
BACKGROUND
MPI-02 is a dual string Schrader Bluff injector. The well was converted from a commingled
producer to an injector in 2002. The well has had a breakthrough event with MPI-15 and it is •
unknown whether the breakthrough was in the OA or OB. String communication has been
.~
• .
suspected since 02' and was verified with a pulse test in 03'. The communication seems to be
stronger from LS to SS but there is evidence that there is some pressure connection SS to LS. It
is suspected that the cause of the communication is either a tubing leak in the LS or a packer
failure (packer @ 5960').
LS
A TD tag was attempted in the LS on 4/11/09 but could not get past 5974' SLM. An LIB
recovered a semicircular impression thought to be a bent collette finger in the Baker `E' Hydro
Trip Sub @ 5984'. A XN plug was then run and set in the XN nipple after some difficulty
getting down and a brush and flush. An attempt to MIT the tubing failed as it pressured up to
2500 psig pumping at 0.2 bpm and bled off to 1300 psig in 4 minutes. A Schmoo-be-gone
treatment was conducted on 6/8/09 with little increase in injectivity observed.
The LS tubing tail was cut off (below the XN nipple) on 8/18/09. A tag was made and found the
severed tubing tail @ 6007' MD estimating 11' of fill above the bottom perf leaving 25' of OB
perfs open.
The plan forward is pump a HCL acid pill down the LS while keeping the SS on injection. ,
DETAILED PROGRAM:
MPI-025S
Keep the SS on injection at 1050 psig throughout this procedure (this is to
discourage the fluid pumped in the LS from communicating across to the SS)
FB - MPI-02LS
1. MIRU pump truck to MPI-02LS
2. Pump 5 bbls MEOH spacer. Pump 30 bbls of 12°Io HCl DAD acid @ 0.5 bpm
without exceeding 1500 psig tubing pressure. Pump 5 bbls MEOH spacer.
3. Allow LS to soak for 90 minutes.
4. Return LS to injection for 10 bbls without exceeding 1050 psig
5. Allow LS to soak for 90 minutes.
6. Return LS to injection targeting 500 bwpd with m~imum wellhead pressure of
1050 psig.
Please contact Keith Lopez at 564-5718(w) or 903-5432(c) with any questions.
Tree: CiW 2-3/8" 5M Dual siring 7
Weilhead:ll" x 2 3t8" 5M FMC dual sfring
Hanger thread 2 3/8° 18T top and 6ottom
2" CIW-H 8~'V profile
13-3/8",5a.5 #fft, K-55 Weld Set 166'
~ P U'~42 f Orig. DF EEev. = 68.5 (27 E}
. .: Orig. GL Elev. = 35.0 (27 E)
Shdr# Strm9
2-318` HES X-Nlpple (1.875" pkg. bore} 2,28t'
9-5l8". 36 #IR K-55 Buft 2800`
KOP @ 500'
Max. hole angie = 69 deg @ 4023`
Hole angle tF-ru perEs = 41 DEG.
7" 26#. 1-80. 67RC Casing
(drift id = 6.15t, cep.= .09g3 bP~
2-3/8". 4.7 #!ft L-80.18'C iubing
{drift id = 1.90i, cap.=.OQ3$7 bPfl
2-3t8" HES X Nipple {9.875" pkg. bore) 5,659'
N-Sands Stradd3ed
Size Spf fntervaf Tvd
92 5,714' - 5,722' 3,896' - 3,905'
12 5,742' - 5,758' 3,920` - 3,932'
12 5.775` - 5,782' 3,945` - 3,951'
12 5,$03' - 5,826' 3,955' - 3,973'
2-3l8" HES XN-Nippte (1,875" pkg. bore} ~ 8fi7'
No-Go t.79i"
Tubing tail / WLEG 6,879`
5ize Spf lntervat Tvd
5 OA sands
5,888' - 5,940'
bB sands
4,038' - 4,069'
5 5,982'-6,01$' 4,101`-4,728'
7° Halli~urton float shoe 6,221`
T° Halliburfon F'loat Cotiar P6Tf3 6,260'
1.15" bafl.
2-3/8" HES X Nippls {1.875° pkg. bore) 2.278' i
2-318" HES X-Nepple (i.875° pkg. bore) 5,~4'
7" x 2-3/8° Baker "GT" Rei. dual pkr. 5,677`
1.945° ID.
7" x 2-3(8" Baker "Gl'° Ret. duaE pkr, 5,849'
1.845"ID.
7" x 2-3/8" Baker "FH" Rei, pkr. ~~ggp~
2-3l8" i1ES XN-Nipple (1.875" pkg. bare) g.976'
NaGo i.79i°
2-3l8" Baker `E' Hydro Trip Sub 5,384'
(2.00" pk8- bore)
~ Tubing tail / 1/Y[.Et3 5>g89'
QATE REV. SY COMMENTS
MILNE POINT UNiT
10/17/02 MDO Cornerted from ESP to Dual tnjector 4-ES {~yELL No.' 1-0Zi
API : 50-029 22066-00
BP EXPLORATION (AKj
• • Page 1 of 1
Schwartz, Guy L (DOA)
From: Schwartz, Guy L (DOA)
Sent: Thursday, September 17, 2009 9:10 AM ~~~~ ~~
To: 'Lopez, Keith'
Subject: RE: MPI-02i acid stim (PTD- 190-091)
Keith,
Thanks for the reply. Was just making sure we are confident that the acid will stay out of the IA during the job.
L-.fS7 /~t- / T - ~i4
Guy Schwartz
Senior Petroleum Engineer
AOGCC
793-1226
From: Lopez, Keith [mailto:lopek3@BP.com]
Sent: Wednesday, September 16, 2009 4:57 PM
To: Schwar~, Guy L (DOA)
Subject: RE: MPI-02i acid stim (PTD- 190-091)
3-31- zoo7
Yes, to the best of my knowledge the IA is not in communication with either tubing strings. There was no
response in the IA pressure during the pressure test of the LS. The IA halds a substantial pressure differential
from the two strings (+/- 700 psig).
Keith Lopez
Wells & Subsurface Engineer
Milne Point - Alaska
BP Explorcrtion A/aska, lnc.
Offite (907)-564-5718
Cell (907)-903-5432
. .,. . R~; ... _ . , .
_ _ __ _ _ _ _ _
From: Schwariz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov]
Sent: Wednesday, September 16, 2009 3:49 PM
To: Lopez, Keith
Subject: MPI-02i acid stim (P'TD- 190-091)
Keith,
I am reviewing the sundry application to acid stim MPI-02. 1 saw you pressure tested the LS tubing with a plug in
the XN tubing tail. Did IA respond at all? ~an I assume the IA has integrity?
Guy Schwartz
Senior Petroleum Engineer
AOGCC
793-1226
9/17/2009
• ,
Maunder, Thomas E (DOA)
From: Preble, Gary B (SAIC) [Gary.Preble@bp.com]
Sent: Monday, August 31, 2009 3:44 PM
To: Maunder, Thomas E (DOA)
Subject: Emailing: MPI-02 TUBING-PACKER ATTACHMENT.doc
Attachments: MPI-02 TUBING-PACKER ATTACHMENT.doc
~~
MPI-02 ~R~G~ ~S ~ ~ ~ ~ ~
G-PACKER ATTACHI ~'tiC t1 C~ t~^~,~ ~
The message is ready to be sent with the following file or link
attachments:
MPI-02 TUBING-PACKER ATTACHMENT.doc
Note: To protect against computer viruses, e-mail programs may prevent sending or
receiving certain types of file attachments. Check your e-mail security settings to
determine how attachments are handled.
«MPI-02 TUBING-PACKER ATTACHMENT.doc»
Page 1 of 1
~.}.~ "4~~,'`~u ii_.~ .E ~d~~'.
Maunder, Thomas E (DOA)
From: Maunder, Thomas E (DOA)
Sent: Monday, August 31, 2009 2:28 PM
To: 'Preble, Gary B (SAIC)'
Subject: MPI-02 (190-091)
Gary,
I am reviewing the 404 recently submitted for cutting off the tail pipe on the long string. There is only one tubing
string listed on the 404 and neither the depth given for it or the packers do not match the last drawing in the file.
Looking closely at the 403, the packer depths don't match there either. Could you reconcile?
Thanks,
Tom Maunder, PE
AOGCC
~~m~ ~ ~~~~~ ~
STATE OF ALASKA
ALAS~L AND GAS CONSERVATION COMMIS~
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ~ Repair Well ~ Plug Pertorations ~ Stimulate~ Other Q~j~T~1f,~~IG TAIL
PerFormed: "^`'~-T
Alter Casing ~ Pull Tubing~ Perforate New Pool ~ Waiver~ Time Extension~
Change Approved Program ~ Operat. Shutdown ~ Pertorate ~ Re-enter Suspended Well ~
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~ Exploratory ~!i 19o-oslo •
3. Address: P.O. Box 196612 ,+ •
Stratigraphic ~ Service 6. API Number:
Anchora e, AK 99519-6612
g 50-029-22066-00-00 '
7. KB Elevation (ft): 9. Well Name and Number:
70 KB • MPI-02 •
8. Property Designation: 10. Field/Pool(s):
ADLO-025906 MILNE POINT Field/ SCHRADER BLUFF OIL Pool .
11. Present Well Condition Summary:
Total Depth measured 6260 ' feet Plugs (measured) None
true vertical 4312.35 . feet Junk (measured) None
Effective Depth measured 6221 feet
true vertical 4283 feet
Casing Length Size MD ND Burst Collapse
CONDUCTOR 71 13-3/8"54.5# K-55 SURFACE - 106 SURFACE - 106 2730 1130
INTERMEDIATE 2765 9-5/8" 36# K-55 SURFACE - 2800 SURFACE - 2384 3520 2020
PRODUCTION 6186 7" 26# L-80 SURFACE - 6221 SURFACE - 4283 7240 5410
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, and measured depth) 2-7/8" 6.5# L-80 S E- 5424' ('1
~~0 0
C
~~
~
SE,E.
''V
Packers and SSSV (type and measured depth) 7" otis awd sump pkr 5863'
~~,,
~
7" otis vst versa-trie 5517' ~
`
0 ~~ ~
0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oii-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 447 1375
Subsequent to operation: 585 1091
14. Attachments: 15. Well Class after qroposed work:
Copies of Logs and Surveys Run Exploratory ~ De~elopment T° Senrice ~'
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ~ Gas ~ WAG r GINJ ~ WINJ ~' ' WDSPL ~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
309-239
Contact Gary Preble
Printed Name Gary Preb Title Data Management Engineer
Signature Phone 564-4944 Date 8/26/2009
~`1~J~ 2 'm "1_~G3
'~'~ ~. K v ~:I h ~~C~E~
~ Q' 7 ~'~~~
Form 10-404 R vised 04/2006 ~" R" ,.- ~ ~~Submit Original Only v ~/
. .~.~ ~~. ,~~ fD ~ ?!J(t~~ ~~ „/~~C(~
~7~~,
• •
MPI-02
1: SO-091
TUBING AND PACKER ATTACHMENIT
Tubing size grade and measured depth:
Dual Tubing:
2-3/8" 4.7# L80 tubing to 5879'
2-3/8" 4.7# L80 tubing to 5989'
Packers and SSSV type and measured depth:
7 x2-3/8" Baker GT Ret Dual Packer at 5677' and at 5849'
7 x2-3/8" Baler FH Ret Packer at 5960'
~'P@~~- Q4c~ ~
~~~~~
~
M PI-02
190-091
PFRF ATTO(:HMFNT
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPI-02 2/19/91 PER 5,710. 5,722. 3,898.4 3,907.55
MPI-02 2/19/91 PER 5,742. 5,758. 3,922.78 3,934.96
MPI-02 2/19/91 PER 5,775. 5,782. 3,947.89 3,953.21
MPI-02 2/19/91 PER 5,803. 5,826. 3,969.16 3,986.6
MPI-02 2/19/91 PER 5,898. 5,940. 4,041.02 4,072.64
MPI-02 2/19/91 PER 5,982. 6,018. 4,104.21 4,131.22
MPI-02 10/17/02 STC 5,677. 5,849. 3,873.22 4,004.02
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
~
•
~
~
MPI-02
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
8/18/2009!***WELL (LS) SHUT-IN ON ARRIVAL""" (E-LINE: JETCUTTER)
~ INITIAL T/I/O: 750/0/0 PSI
j CUT TUBING @ 5984' AS PER PROGRAM.
~ CCL TO CUTTER: 4.2' CCL STOP DEPTH: 5979.8'
~ FINAL T/I/O: 1000/0/0 PSI. NOTIFY PAD OP. RDMO
I"*"LS STRING SHUT-IN ON DEPARTURE**"
8/19/2009~***WELL S/I ON ARRIVAL"''* (LONG STRING)
i RAN 3' X 1.5" STEM, 1.75" CENTRALIZER, SAMPLE BAILER TO 5974'
~SLM ( SETTING DOWN IN XN NIPPLE)
~ RAN 3' X 1.5" STEM, 1.75" LIB TO 5998' SLM (IMPRESSION OF COLLET
iIN HYROTRIP)
;TAKING CORRECTION OFF OF PREVIOUS TAG OF XN NIPPLE.
iCUTOFF TAILPIPE ASSEMBLY IS AT 6002' MD + 5' FOR TUBING TAIL =
i6007' MD FOR TOP OF FILL. ESTIMATE 11' OF FILL OVER BOTTOM
~ PERF. ~ ~ ~ ~~~
j*""JOB COMPLETE, RDMO""*
FLUIDS PUMPED
BBLS
1 DIESEL
1 TOTAL
•
•
~ ~ ~ ~~ ~~ /
~ ~ ~ SARAH PALIN, GOVERNOR
t ~ ~ ~
Mr. Chidiebere Igbokwe
Petroleum Engineer
BP Exploration (Alaska) Inc. , j ,, ~~ a~ c~
P.O. Box I96612 ~'~~~~~~"~ J ~ ~' % ~`i
Anchorage, Alaska 99516-6612
Re: Milne Point Field, Schrader Bluff Pool, Milne Point Unit I-02
Sundry Number: 309-239 ~ " ~
~
Dear Mr. Igbokwe: ~ 1 ~
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Ccmmission to witness any
required test, contact the Comrnission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, withuz 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Comrriission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30. PM on the 23rd day following the date of this letter, or the ne~ working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
~
DATED this ~ day of July, 2009
Encl.
Daniel T. Seamount, Jr.
Chair
O~ V~ ;~~t~ ~ STATE OF ALASKA
~ ~~ ALAS~OIL AND GAS CONSERVATION COMM~ON
~,1~ APPLICATION FOR SUNDRY APPROVALS
~ 20 AAC 25.280
~Gt~/~I 4/ ~~
~ ,.~~~ ~. ~ ~Ll~~
~~~ , : .
_ n:! 4. C_ae ('e-C!~ ~.~iY§1'~~~'~a~~Sa
1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ ` aiver ~~~~~~,~~~~~,Other
Alter casing ~ Repair well ~ Plug Perforations ~ Stimulate ^ Time Extension ~ CUT TUBING TAIL
Change approved program ~ Pull Tubing ~ Perforate New Pool ~ Re-enter Suspended Well ~ r/.~.i
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), Inc. Development ~ Exploratory ~ 190-0910 •
3. Address: P.O. Box 196612 Stratigraphic ~ Service Q~ 6. API Number:
Anchorage, AK 99519-6612 50-029-22066-00-00 ~
7. If perforating, closest approach in pooi(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: ~ ~~ ~~'~~ ~' ~~'-~ ~
~~ /~ ~
Spacing Exception Required? Yes ^ No
^ ~/
~ 7i ~
9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ~, `
ADLO-025906 ~ 70 KB ° Milne Point Field / Schrader Bluff Pooi .
12• PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured):
6260 ' 4312.35 ~ 6221 4283 NONE NONE
Casing Length Size MD ND Burst Collapse
Structurai
Conductor 71 13-3/8" 54.5 # K-55 SURFACE 106 SURFACE 106 2730 1130
Surface
Intermediate 2765 9-5/8" 36# K-55 SURFACE 2800 SURFACE 2384 3520 2020
Production 6186 7" 26# L-80 SURFACE 6221 SURFACE 4283 7240 5410
Liner
Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
SEE ATTACHED 2-7/8" 6.5# L-80 SURFACE - 5424'
Packers and SSSV Type: 7" OTIS AWD SUMP PKR Packers and SSSV MD (ft): 5863'
7" OTIS VST VERSA-TRIEVE 5517'
13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work:
Detailed Operations Program ~ BOP Sketch ~ Exploratory ~ Development ^ Service Q~
15. Estimated Date for 16. Well Status after proposed work:
Commencing Operations: 7/24/2009 , Oil ~ Gas ^ Plugged ^ Abandoned ^
17. Verbal Approval: Date: WAG ~ GINJ ^ WINJ Q• WDSPI ^
Commission Representative: Prepared by Gary Preble 564-4944
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Giovanna Boccardo
Printed Name ~ Chidiebere I b k e Title Petroleum Engineer
Signature t}~, ~% Phone Date
t `~;: a, ~ ti
"
'~
~ ~
>'
~
`
564-4795 7/10l2009
°"~. COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~ y~ a~ ~
Plug Integrity ~ BOP Test ~ Mechanical Integrity Test ~ Location Clearance ^
Other: ~~-~~ CCj,~~~ CLC v`'i e i~-'~~J~..'t~ `~. GCL~ ~~( Pv ~C., a-S . c~ b~
l-
Subsequent Form Required: '~^`oy ~~~~ i~~° ,~U~- ~ ~3 ~~~~
l
~ APPROVED BY ---- ~~
~
~
/
~/
~/
~
i
Approved by:
COMMISSIONER THE COMMISSION Date:
/
~
~~~
~, ~ U~IUiNAL ~~ ~,~~~
Form 10-403 Revis 06/2006 Submit in upiicate
-~-r//v/GlY
MPI-02
190-091
PFRF ATTArHMFNT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPI-02 2/19/91 PER 5,710. 5,722. 3,898.4 3,907.55
MPI-02 2/19/91 PER 5,742. 5,758. 3,922.78 3,934.96
MPI-02 2/19/91 PER 5,775. 5,782. 3,947.89 3,953.21
MPI-02 2/19/91 PER 5,803. 5,826. 3,969.16 3,986.6
MPI-02 2/19/91 PER 5,898. 5,940. 4,041.02 4,072.64
MPI-02 2/19/91 PER 5,982. 6,018. 4,104.21 4,131.22
MPI-02 10/17/02 STC 5,677. 5,849. 3,873.22 4,004.02
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
. •
~~
To:
From:
BP Exploration Alaska
Milne Point
C. Olsen/J. Bixby
ADW Wells Ops Supervisor
Jerry Sharp/Mark O'Malley
MPU Well Operations Supervisor
Keith Lopez
Schrader Bluff Production Engineer
Subject: MPI-02LS Cut Tubing Tail
Date: 6/24/09
IOR: 100 bopd
A~; MSIPDWL02
COST: $30K
Cate o Ste Descri tion
S 1 Drift for 1.68" Jet Cutter
E 2 Cut off tubin tail at 5984' ELMD
S 3 Ta TD
WELL INFO:
1. Well status: Both strings on water injection.
2. Minimum I.D.:
a. LS: 1.791" at 5976'MD - 2-3/8" HES XN nipple
b. SS: 1.791".at 5867'MD - 2-3/8" HES XN nipple
c. Obstruction @ 5984'
3. Pressure:
a. LS: 2135 psi @ 4000' TVDss (3/16/0'n
b. SS: 2056 psi @ 4000'TVDss (3/15/0'n
4. Maximum wellbore angle through tubing is 69 deg at 4023'MD
5. Hole angle through perfs: 41 deg
6. Last downhole ops: LS MIT on 6/5/09
7. Last PBTD tag: LS 6104' on 9/13/06
OBJECTIVES:
Use an E-line deployed jet cutter to cut the LS tubing tail and allow it to fall to the bottom of '
wellbore. This will allow access to the mainbore. SL will then perform a TD tag.
" ~ ~
BACKGROUND
MPI-02 is a dual string Schrader Bluff injector. The well was converted from a commingled
producer to an injector in 2002. The well has had a brea.kthrough event with MPI-15 and it is
unknown whether the breakthrough was in the OA or OB. String communication has been
suspected since 02' and was verified with a pulse test in 03'. The communication seems to be
stronger from LS to SS but there is evidence that there is some pressure connection SS to LS. It
is suspected that the cause of the communication is either a tubing leak in the LS or a packer
failure (packer @ 5960').
LS
A TD tag was attempted in the LS on 4/11/09 but could not get past 5974' SLM. An LIB
recovered a semicircular impression thought to be a bent collette finger in the Baker `E' Hydro
Trip Sub @ 5984'. A XN plug was then run and set in the XN nipple after some difficulty
getting down and a brush and flush. An attempt to MIT the tubing failed as it pressured up to
2500 psig pumping at 0.2 bpm and bled off to 1300 psig in 4 minutes.
Plan forward is to cut the tubing tail using a jet cutter and allow it to fall to the bottom of the
mainbore. SL will then move in and perform a TD tag to determine if a CT FCO is necessary to
increase injection into the LS.
DETAILED PROGRAM:
Slickline:
Drift LS to 5984' MD for 1.68" Jet Cutter
a. Note: there is an obstruction in the Baker `E' Hydro trip sub at 5984' MD.
E-line•
Jet cut 2-3/8" tubing at 5984' ELMD.
Tie-in Log: SLB Depth Correlation log
Tie-in Injection String
18-October-2002
Slickline•
1. Drift LS and Tag.
Please contact Keith Lopez at 564-5718(w) or 903-5432(c) with any questions.
Tree: CIW 2-3/8" SM Dual strin
Wellhead:11" x 2 3/8" 5M FMC dual string
Hanger thread 2 3/8" tBT top and bottom
2" CIW-M BPV profile
13-3/8",54.5 #/ft, K-55 Weld Set 106'
~hort Strina
2-3/8" HES X-Nipple (1.875" pkg. bore) 2,251
9-5/8", 36 #/ft K-55 Butt 2800'
7" 26#, L-80, BTRC Casing
(drift id = 6.151, cap.= .0383 bpfl
2-3/8", 4.7 #/ft L-80, IBT tubing
(drift id = 1.901, cap.=.00387 bp~
2-3/8" HES X-Nipple (1.875" pkg. bore) 5,659'
N-Sands Straddied
Size Spf Interval Tvd
12 5,710' - 5,722' 3,896' - 3,905'
12 5,742' - 5,758' 3,920' - 3,932'
12 5,775` - 5,782' 3,945' - 3,951'
12 5,803' - 5,826' 3,955' - 3,973'
2-3/8" HES XN-Nipple (1.875" pkg. bore) 5,867'
No-Go 1.791"
Tubing tail / WLEG 5,879'
Size Spf Interval Tvd
5 OA sands
5,898' - 5,940'
OB sands
4,038' - 4,069'
5 5,982' - 6,018' 4,101`- 4,129'
7" x 2-3/8" Baker "GT" Ret. dual pkr. 5,849'
1.945" ID.
7" x 2-3/8" Baker "FH" Ret. pkr. 5,960'
2-3/8" HES XN-Nipple (1.875" pkg. bore) 5,976'
No-Go 1.791"
2-3/8" Baker'E' Hydro Trip Sub 5,984'
(2.00" pkg. bore)
~ Tubing tail / WLEG 5,989'
7" Halliburton float shoe 6,221' ~
7" Halliburton Float Collar PBTD 6,260'
DATE REV. BY COMMENTS
10/17/02 MDO Converted from ESP to Dual Injector 4-ES
MILNE POINT UNIT
WELL No.: I-02i
API : 50-029-22066-00
BP EXPLORATION (AK)
3/8" HES X-Nipple (1.875" pkg. bore) 2,278' I
2-3/8" HES X-Nipple (1.875" pkg. bore) 5,660'
7" x 2-3/8" Baker "GT" Ret. dual pkr. 5,677`
1.945" ID.
M P U I~~2 ~ i9• DF Elev. = 68.5 (27 E)
Orig. GL Elev. = 35.0 (27 E)
[Fwd: 1-02i 7" casing failure]
Subject: [Fwd: 1-02i 7" casing failure]
Date: Sat, 23 Nov 2002 08:03:09 -0900
From: "Jeff B. Jones" <jeff_jones@admin.state.ak.us>
Organization: AOGCC
To: Tom Maunder <tom_maunder@admin.state.ak.us>
Hi Tom,
Here is some more info on the 1-02 7" casing failure regarding the
electric cabling removed from the well.
Thanks,
Jeff
Subject: RE: 1-02i 7" casing failure
Date: Sat, 23 Nov 2002 10:35:40 -0600
From: "Hasebe, Brant M" <HasebeBM@BP.com>
To: "Jeff Jones (E-mail)" <jeffjones@admin.state.ak.us>
CC: "Tom Maunder (E-mail)" <tom_maunder@admin.state.ak.us>
Jeff,
Apologies for the delay in response. For some reason I had this
sitting in my "Drafts" box and just now realized it...
Our Centrilift crew takes good notes during workover operations and
pay particular attention to potential cable failures and the like. During
the pull in question, the heat trace cable was found to be good and balanced
phase to phase and phase to ground with no indication of compromise. The
ESP cable had a few armor blowouts the last 1000' to the ESP, but this
didn't result in an electrical compromise and also is far below the location
of the casing leak. It should be noted that this well had been worked over
with new equipment after the Paratrol heating system in question was
replaced. Let me know if you have any other questions and we'll keep you
appraised of any changes in the existing wells.
Regards,
-Brant
..... Original Message .....
From: Jeff B. Jones [mailto:ieff iones@admin.state.ak.us]
Sent: Sunday, November 03, 2002 2:33 PM
To: MPU, Wells ESP Coord
Cc: Tom Maunder
Subject: Re: 1-02i 7" casing failure
Hello Brant,
thanks for the information regarding MPU well 1-02 and the other wells which
were operated with this type (
Paratrol ) of system that you and Jack Merrifield have provided. I do have
one question: what is the
condition of the ESP/heat trace cabling ( in the area relative to the depth
of the hole in the 1-02 7"
casing ) that was removed from well 1-02 during the recent injector
conversion? Has this cabling been
checked for damage? The increased surveillance you described of these wells
appears warranted and please
keep the AOGCC informed of any problems that arise in the future regarding
this topic.
Thanks again for the information,
Jeff Jones
AOGCC
I of 3 11/25/2002 4:46 PM
C3
~
I
LL.
C3
~
C3
C3
a..
"-
"-
co
I
t-
I
~
" If
l
.-li.
I
e
I:)
....
I.L
e
tU
....,.
CQ
"-
~
~
~
I
CÐ
I
......
u
C>
STATE OF ALA~t\A
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanlcallntegrlty Test
E-MaU to~ Tom_Maunder@admln.state.ak.us and Bob_Fleckenstein@admln.state.ak.us
OPERATOR:BP
F'ELD / UNIT I PAO~ .MiLNE POfNT UNiT
DATE: October 18J 2002
1Jv'GI(
~!"., " PERMit 'l' ';~ :,:~; ',:. :" r·}i. ~:. <;' y. i;,.l· ¡ ::'/ ,,;:; ,"{.~" ';> ·r,'· ":'r:: i'.· :i ":' : ....:.j: .:\ ,\., .;<. ,~. :' :'. '. ~:-t': ,. ~ ;i ·P..~tEst: : ·.~T AR1;:;;tM'I~ ;;;Ç~3If"'(I'e; ;'¡," ">" ~: . :y¡ : ":::y
~·.'.~~~~~~~'~¡i
~ 1: . /.~ 'WEµ :·l.(~ 'r.I:.Ulp~'.,: 1 ,I P=ï: ;: .:~ F.L:Olu.~ : ~,r\"::<'~D'~ 1~6. ~~. 81...e JWT·::,G~OJ2.,;,~·;.slZ~ ': ~~P8ESS-J ~." PRESS! " ~; . i C$G I . " 7::. 'ÇSG:-· ::-~ '::,': ÇSG',:-. ~ , : ~tIME:'-'-~:1 :. :+~: ..~.~.,,',
'{~~;,~~·,~}NtíM.ËR~.~~~\·: :~~?<": ·~.-~~{{~:f;:.~ ';,"?()' ~ ::' "'~'¡~;~):'~~':,:~'..,:,:"::,:". :"~~·::~::'~:·~'/":~·::":-;:'=t·Z:..::';:.~~.:~,~.':;: ~:~~T;;}~:: ..~.:::~ .?~.:::..;':/:.~.~-r;.':~':.~~:~:j:..;:: j~: ÞRÊ$$,~ ;:~·P.RE·~,S,.~··¡:~· PR'ESS~: ?;~:··~:?~?::.:I:;: ?;n,:::~t): I
-- - -". N M' BRINE, 411 DO 7P126tlL80 : 2..318/' : 3J 000 3) 000 . 3.000 . 3,000 X
. Wen,: MPI-02 'i P1ESEL 5)675 4.7 ; 1025 2,000 2.060 ~ooo 2)000
COMMENTS:
MJT TeST WAS PERFORMED IN 1WO STEPS TBG. TO 3000 SET PKRS & MONITOR 3D-MINUTES /BLEED TBG & PRESSURE ANNULUS TO 2000 & MONiTOR,
. PTD: ' i. . .
'¡ Well #:
COMMENTS:
MPI-02 API. ~ 5()"~9-22086 PERMJT # 190-091 SHARDER INJECTOR OA & DB SANDS.
PTD: '
Well #:
COMMENTS:
PTC:
Wen #:
. COMMENTS:
PTD:
WeU #:
COMMENTS:
TBG. INJ.. FLUID CODES
F = FRESH WATER 'NJ.
G = GAS INJ.
S = SAlT WATER lNJ.
N = NOT iNJECTING
TEST TYPE:
M = ANNULUS MONtTORING
P = STO ANNULUS PRESSURE TeST
R = INTERNAL RAD. TRACER SURVEY
A = TEMPERATURE ANOMALY TEST
Q = D1FFERENTtAL TEMPERATURE TEST
ANNULAR FLU'D: P,P .G. Grad.
D1ESEl 6.5 0.34
GLYCOL
SALTWATER '10.2 0.53
ORIU..ING MUD
OTHER
WELL TEST:
Initial X
4 w Year
Workover
Other
D161ribut'lDn:
0'"'9 - weO F~'&
c - Operalor
c - Database
Sheet revised by L&!.-Q9flle
c - Ins.pector
LARRY MYERS
. AOGCC REP SIGNATURE:
OPERATOR REP SJGNA TURE:
CHUCK SHéVE (WA'VEDl
".
REeerVED
OCT 2 1 2002
- Alàska Oil· & Gas Qons. CommlllJon
'-: Anchorage
rl
. qD'" ()~\~~ \ ...C~
Copy of MP B..Q2 M~T
10'1912002.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Mike Bill, ~'~
Commissioner
THRU: Tom Maunder,
P. ,. Supervisorp'~ '\~,~'~_
FROM: Jeff Jones,
Petroleum Inspector
DATE: October 11, 2002
SUBJECT: Investigation
7" casing failure
Well UPI-02
BPXA
Milne Point Field/MPU
October 11, 2002: I traveled to BPXA's Milne Point Field well MPI-02 to
investigate a 7" casing failure.
On my arrival at Nabors rig 4ES to witness a BOPE test, I met and discussed the
rig work over (RWO) with BPXA representative Larry Myers, who was in charge
of the operation. Well MPI-02 was an Electric Submersible Pump (ESP)
completionbeing converted to a multi-zone injection well. During the RWO, a
casing integri~test determined that the 7" buttress casing was leaking. A drill
pipe conveyed packer (RTTS) was used to identify the location of the leak: a 15'
section of casing at a depth of between 407' MD and 422" MD. A leak rate of
approximately 1.5 BBL/min. @ 1500 PSI was noted. The upper approx. 500' of
7" casing was cut & removed, and new 7" buttress casing was installed to
surface and set on emergency slips at the wellhead. A new emergency pack-off
was installed with a "B condition" tubing spool and tested successfully. Well MPI-
02 was re-completed as a dual injector.
I inspected the damaged 7" buttress casing and noted a circular hole in the
caSing that measured approx. ¼" diameter on the outer surface and approx. %"
diameter on the inner surface. The hole, in my opinion, appeared to be "burned"
or "melted" in the casing rather than a split or fracture of the pipe. I spoke with
BPXA Milne Point Field Supervisors Mike Hefley and Jack Merrifield regarding
the casing failure and requested that the cause be investigated and reported to
the AOGCC. I also requested that the shielded ESP electric and heat trace lines
removed from well MPI-02 be inspected for damage in the area that corresponds
to the depth of the 7" casing damage. BPXA MPU Artificial Lift Coordinator Matt
Linder investigated this item but was unable to find any damaged cabling. He
indicated that if there was damaged cabling it was probably removed from the
well during one of several RWO's that were performed between 1991 and 2002
and is not available for inspection at this time. Photographs of the 7" casing and
the affected area is attached for reference.
MPI-02 7 inch Casing Failure 1 O-11-02 JJ.doc
Summary: I inspected a 7" casing failure that occurred on BPXA's Milne Point
Field well MPI-02.
Attachments: MPI-02 7" casing photographs (2)
Mpu Lead Tech J. Merrifield Report (3) v/'
MPI-02 Well & Wellhead Schematics & RWO History (18)
BPXA Daily Operations Reports (3)
E-mail from Brant Hasebe BPXA MPU ALC (2)
NON-CONFIDENTIAL
cc:
MPI-02 7 inch Casing Failure 1 O-11-02 JJ.doc
Tests performed on the original insulating doughnuts installed in the two failed
applications, determined that the doughnuts had some conductive properties and
may have help cause the failures. So the manufacturer was contacted and a
different material was used to mold replacements. The 1-02 well was the first to
have these replacement insulators installed. The 1-02 Well was unlanded and
raised and it was found that the E-SUB had failed and arced across the inlet and
outlet. The E-SUB was replaced. Since the workover rig was in place it was
decided to replace the insulating doughnuts that fitted between each joint of
tubing. A Time Delay Reflectometer (TDR) had been rented and brought on site
to investigate the failures. A TDR will inject a signal and reflect back the
distance to where the short occurred. However, a TDR is primarily used on
insulated wire with known capacitance values. Since the capacitance values of
the system were not known, the exact distance to the shorts were never
determined.
As the 1-02 ESP and tubing was run in the hole, the electrical characteristics
were monitored on the insulated tubing. Each time the tubing was in the
wellbore to about 500-700 feet the tubing went shorted to ground and the
process was stopped and the tubing pulled. Repeated attempts and different
torque values were done on the tubing joints to insure the doughnuts were
compressed to seal them. Eventually even though the tubing was shorted it was
determined to land the completion. The reason we continued to indicate a
shorted condition was unknown and after 8 days of work over it was determined
to just run the completion and hope it would work under current.
After the surface hook up was reinstalled the Paratrol system was activated and
it tripped the breaker. It was determined to indeed be shorted and pulled about
1300 amps at 186 VAC single-phase. The Well ESP was never started. After a
week of additional troubleshooting and investigation it was determined to utilize a
ESP variable speed drive to limit the power to the Paratrol system to the current
that was being pulled by the J-05 and 1-01 wells which had successful Paratrol
installations.
This connection was made and the 1-02 Paratrol system was activated at the
VSD limitations of 241 amps. The voltage I remember was in about the 20 VAC
range. The ESP was started but the well froze up after several days of
operation.
Additional attempts were made to install the Paratrol systems on the I-4 and J-4
wells but also never met with success. All failed at a TDR reading of 500-800
feet down hole.
The 1-01 and J-05 never shorted and ran until their ESP's failed and required
work-overs. The Paratrol systems were replaced on those wells with the present
UL approved heat trace systems for downhole applications. The J-05 well
Paratrol system operated in excess of 44,000 hours.
The concept was not continued in 1993 due to the poor overall success rate. Of
the 8 attempts to utilize this system, only 2-of the systems ever operated
successfully (I-01 and J-05).
1-01, 1-02, 1-04, J-05, J-07, and J-04 all had a Paratrol System installed for either
operation or an attempt at operation.
Of all the systems installed the current limit operation was only performed on the
1-02 as I remember.
Results:
The failed systems were eventually removed and discarded; it is believed that
the doughnut actually held the seal to the wrap on the upper and lower side of
the two joints as intended. However the well was under work over operation and
was killed with water, seawater, or brine. As the Tubing was lowered into the
well bore the pressure on the outside of the seal far exceeded the interior
pressure on the inner ID of the doughnut. Once adequate head caused a
sufficient-over balance condition, the kill fluid-penetrated the doughnut seal
surface and made a conductive path to the tubing. The paths that occurred
near the inner surface of the inner annulus provided an early current path before
the current reached the contactor at 3500 feet where the well would have
adequate distance for the applied voltage.
Looking at the failed casing that was removed from 1-02 it is my opinion that
when the Paratrol system was operated in current limit at the Iow voltage, the
casing was under a continual arcing condition. The surface of the metal was
heated and material was lost. Either at that time or sometime since then the
integrity failed at that point and was not detected.
As of now, no Paratrol systems are in operation on any Milne Point Well. I do
not know of any additional wells that have ever had this issue.
It is unlikely in my oPinion that the ESP cable could ever fail and cause a similar
failure on a well casing.
Jack S. Merrifield Jr.
MPU Field Lead Tech
907-670-3359
• •
Maunder, Thomas E (DOA)
From: Jeff B. Jones [jeffjones @admin.state.ak.us]
Sent: Wednesday, October 16, 2002 10:49 AM
To: Maunder, Thomas E (DOA)
Subject: CGF gas release report and MPI -02 7'casing photos
Attachments: Hydrocarbon Release CGF LTS3GLX 10 -12 -02 JJ.doc; CGF GTLX Train3.2.JPG; CGF GTLX
Train 3.4.JPG; CGF GTLX Train 3.JPG; CGF GTLX Train 3.3.JPG; MPI -02 7in.csg.JPG;
MPI -02 7in.csg.3.JPG; MPI -02 7in.csg.2.JPG
Hydrocar. ,n CGF G CGF GT rain CGF GTLX in CGF GTLX in MPI -02 7in.csg.JPG MPI -02
elease CGF LT ,GL. Train3.2. G 3.4.JPG 3.JPG 3.3.JPG 7in.csg.3.JPG
o hti ,
MPI -02
7in.csg.2.JPG
Hello Tom,
attached is a report on the gas release at CGF and some photos of the hole in the 7"
casing that 4ES removed from well MPI -02. The hole in the casing is approx. 1" diameter on
the inside and approx. 1/4" diameter on the outside. The folks at Milne Point Facility
suspect that either the ESP power cable or the heat trace cable was arcing (480 V) against
the casing and caused the failure. I have some attachments and supporting documents that I
will bring to town for your review. Chuck just called and the AA Prudhoe flight for this
morning was cancelled due to a mechanical problem. He said they scheduled one for this
evening. I don't know how that will work for the performance review meeting we had
planned, but we'll work it out.
Thanks,
Jeff
1
s
MPU SB I -02 (190 -091) 7" casing hole October 16, 2002
,, s . ��
4,
.. F '._ h 4.$'Yk� aM iq
�� � � ,, "a -^ * Vii%
�" • ,:' � AA�R - _ $ t4 '45 a "v
u' . i . z u ? . x q
E
, ; mss;,
;,
y ,
t
13 . PM
MPU SB I -02 (190 -091) 7" casing hole October 16, 2002
' ''i:', .A'•':•''•1 -'<- ' ••. ,•••• -, ,•-• •--: • ,......- . -.' - • , -.,- , , ....,.- -,,,,,,... -.., ..., z'-'. ,..
,.. , . .„ ....
, .
, .
)44i4.-.. 4
, ' ...
.. ,„
..., . „
, .
. -
,,...
, ,..
‘
,-.
,.,
) ' .
. ;
'
1,.,4t"
.,. ..= .-
MPU SB 1-02 (190-091) 7" casing hole October 16, 2002
Re: 1-02i 7" casing failure ~-'" '-'"
Subject: Re: 1-02i 7" casing failure
Date: Sun, 03 Nov 2002 14:33:17 -0900
From: "Jeff B. Jones" <jeff_jones@admin.state.ak.us>
Organization:-AOGCC
To: "MPU, Wells ESP Coord" <MPUWelIsESPCoord@BP.com>
CC: Tom Maunder <tom_maunder@admin.state.ak.us>
Hello Brant,
thanks for the information regarding MPU well 1-02 and the other wells which were operated with this type (
Paratrol ) of system that you and Jack Merrifield have provided. I do have one question: what is the
condition of the ESP/heat trace cabling ( in the area relative to the depth of the hole in the 1-02 7"
casing ) that was removed from well 1-02 during the recent injector conversion? Has this cabling been ·
checked for damage? The increased surveillance you described of these wells appears warranted and please
keep the AOGCC informed of any problems that arise in the future regarding this topic.
Thanks again for the information,
Jeff Jones
AOGCC.
"MPU, Wells ESP Coord" wrote:
> Jeff,
> Enclosed below is a document written by Jack Merrifield, MPU Lead
> Production Operator, on the Paratrol'heating system we believe is
> responsible for the compromised casing we found in 1.02. I belive he
> spoke to you in depth about this last week. if you have any further
> questions, please do not hesitate to call - though if you have specific
> questions about the history of Para'roi systems I suggest you call Jack
> specifically. He is on R&R right now and will be back in a week.
You may have questions about other wells at MPU that have in the
past had Paratrol systems in place at one time. The wells that had this
system were 1.01, 1.02, 1.04, J-04, J-05, and J-07. 1.02 was the only
well where a VSD was utilized to maintain a constant current despite a
downhole short situation, which we feel was resonsible for the wall loss.
As you know, we recently worked over 1.02 and replaced the casing.
It should be said up front that the reason, for the recent discovery
of the compromise in the casing was spurred by the decision to convert
1.02 from a producer to an injector. None of the producers inquestion,
including.l-02, have ever exhibited inner or outer annulus pressures in
excess of #2000 or #1500 (respectively), whiCh are.our threshold pressures
to identify the need for further troubleshooting. These threshold
> pressures we use at MPU are in line with-Alaska Administrative Code
> 20AAC25.412. In the life of these wells, the highestpressures seen are
> as follows:
IA .OA
1-01 - 1840 1160
1-02 1750 850
1-04 5O0 460
1-04A 480 370
J-04 800 720
J-05 975 950
J-07 480 450
The 1-01 and J-05 systems were successful 1-01's last ESP failed
in December of 1998 and was not replaced. We continue to monitor the IA
and OA pressures and have not seen any indication of communication. J-05
has been worked over once in October 2000 since the initial installation
in December of t991 and is currently producing. Again, there is no
evidence of IA x OA communication.
We have instigated daily tracking of the OA and IA pressures on the
remaining three wells, 1-04A (sidetracked from 1.04 on 7/23/01), J-04
' - 11/R/2002 10:46 AM
I~e: 1-02i 7" casing failure
> (currently shut in), and J-07, because there is indication that the IA and
> OA are tracking eachother. Again, none of these wells have pressures
> anywhere close to threshold values, we are simply increasing our
> surveillance of these wells because of the potential situation brought to
> light by 1-02's conversion. FY/, the wellhead packoffs were checked on
> all these wells and verified good.
> One of the qUestions alluded to in Jack's document is the possiblity
> of ESP cable causing a similar situation. Cable faults occur due to
> blowouts in the protective metal armor caused by expansion of the gas
> trapped in the insulating material. This allows entrance of we//bore
> fluids and results in a short. When this happens, the ESP immediately
> shuts down due to an instantaneous overload trip detected by the variable.
> speed controller. The situation of constant current application to a
> shorted system, as that employed with 1-02's Paratrol system, would not be
> possible. During the next RWO of the above mentioned wells a determination
> will be made whether or not to run a packer to check out the top 3000' of
> casing. All factors of casing integrity will be considered when making
> this decision.
> Again, please feel free to call if you have any further questions or
> concerns.
> Regards,
> -Brant Hasebe
> <<021017 MP/-02 Damaged Casing Explanation3. doc>>
> ps - please feel free to forward this email to other appropriate
> personnel.
> Brant M. Hasebe
> Artificial Lift Coordinator
> Mi/ne Point
> * Internal: BPX Mi/ne Point L-I, P.O. Box 196612
> * Externah 1000 Mi/ne Point Road, Prudhoe Bay, AK 99734
> * Work (907) 670-3333
> * Fax (907) 670-3390
> * hasebebm@BP, com
Name: 021017 MPi-02 Damaged Casing Explanation3. doc
027017 MPi-02 Damaged Casing Explanation&doc Type: WINWORD File (application/msword)
Encoding: base64
itt. t/ J.O
2~
N '
To: ,Jim
From; ~ Linde(
__ __
I~J~! Dar 4/6/2001
flOP Dele: 4/9/2001
Fall C)~e: 414/2D02
RurilJme: 360
_.
,
Date: Monday, May 27, 2002
i
·
I
;
:
i
I q . I , I
i! I i i
Sl[Bli~ 8Uwa¥: ' 4/~11~G6 8~fl~ ~ H-1 li. I~Si
i
P~: 1~ E~o~ ~HP: 1150
9ohfader Bluff N/O;
i-02 £9P was ImdaN
f'e~l wide shut da~'~
p4~npmam'o PHD f~
i III
II · i
~d afl 4aM:)1 end over i~s life required mJmeroLlS $1icldlne bumps 1o remtmt.. A
cK~ured off 12/7/01. Upon re~ld, the unit son until 12/9t01 when I'he
Bed oral 3 houm liner ~e unit shut down. Cenlililt was ~Ned to ctmck downhole
esCX:N'ded weak plliSe lo graund buL good pkB~e tO pl'mse. On 414102 b'le uJ~
7t29J1994
3/3,/1996
3/20/lgg6
Wlg/IOO~
10/2011990
9/22/1997
1/9/1990
2/2d/1998
10tl,2000
Waif c~wn for ~ tu~, ~ pr~ ~.
lZ~ ~ 4~
~n
~ ~m ~ ~, ~ ~18~,
~ ~e~ul ~ ~ ~ ~ ~k~.
Pe~: 14~ ~
RWO ~ N~. R m ~ E~P ~ ~n~ Heat
:
3/2:8/2001 RWO Pul! PCl~ar¢l replace ~ 21~ FCNPSH/FC.,650'~ ...... J
Rue- I Pump Pu~p Pump Mot~'
I~lailed l~rst Pr¢~ Fgiture Dgm days ; Type ~ ~ $1,.g~ ~ ~ ~ HP V Amps
.__
' F'PINTHP-2 [~ .65__~_2~..~
VSC KVA Xfmer KVA I Xfme~ Ra~io V$C ~rn Ximer ~fl
i
!
;
O~ T~ 8~ ~t ~GY
~ ' ~ s~, ~ r~ the B~y ~p,
Dom BOPO
~ FOrm.
Rate Gas TGLR GOR Amps Hz PiP WHP WHT
Tree: CIW 2-3f8' 5M i:kml abing
Wollltead: 11'xZ 3/8' 5M FMC ~al ~
Hanger th~eed 2 3/8' IBT top and boltT~n
2' CIW. H BPV profile
MPU 1-02i
DI-A-Iil]iLINIL ! VIllI'-'
I I,
Orig, DF Elev. = 68.6 (27 E)
Orlg, GL EIo¥. = 35,0 (27 E)
13-3/6",54.5 #/ft, K-,55WIdd Set ~
2-3/8' HES X-Nil~le (1.675" pkg. bore)
2.-3/r HES X-N~p~ (~.875' p~. kxxe) ~
D.5/r, 36 ~ K-55 ~lu(t ~
KOP ~500'
Max. hole a~gle = 69 <leg @ 4023'
Hole angle 1bm perf$ = 41 OEO.
(ddtt id = 6, t5~. cap." .03e~ bpf)
2-3/8'. 4.7 ff./it L-EI~, IBT tubin9
(drR id -- 1.901, r, ep.=.01)387' bpi)
2-3/r HE$ X-Nipple (1.67D" l-'&g, bore) ~
N-,,'~nds ~lraddled
2-3~ HFS XN-~ (1.8'i'$* pkg. bore) ldo.Go 1.791"
Tubing ~ I WLEG
2-3/6" I-lES X-Nipple (1.675" pkg. Ix~) ~
7' x 2-3/a' E.,ker'Gr' ~t ~ .u. I ~:~7' ]
~.945" ID.
7'
x 2-3/9" Baker ~T" ReL dual pkr, ~
1.945' ID.
Size Spt In~rval Tvd
.
6 5,89~'- 5.940' 4.038' - 4,~'
5 B,~' - 6.018' ;,,4.101'-4.t~'
7' HMll)urmrt Ik~at shoe ~
7' Halh~urtm Float Collar PBTO ~
7' X 2,3/8" I~aker 'FH' Ret. pkr.
2-s~' HES X~-~pp~
No-Go 1.791'
2-3/B' Baker 1~' Hydro Trip
(2.00"pkg. bore}
1.75" ball.
DATE
10117/02
COMMEN'~
Conver~ed'fiTmi'E~P ~ I~ Inje0~or 4.E~S
ii
M!~NE POINT UN~_
WELL No.: 1-02i
BP EXPLORATION (AK)
000c3 IdV .,I ~
000~
(3ALVA Idly3) ~£'L~
I
o00c. ]dY .9~/
000~ IdV
~L 't'
i
I
/O'c~g
gO'gOt
g~
OT /O
..I
I
-T~t~g J~mf essy. 11" SM s 11~ SM wI ~ 1116" ~ (pa. 441734)
7-1.~-89
TF,.GT FI T'I'i NI~
LI:X~
N'F.~"T FITTIN~
,~4...i"4& I.~i ,LTl.
'CAMEliON
FIELD SERVICE[ ORDER
&
WEU,HEAD
- J~l.,v .~ u-'----, tV-J.,.3 I"'.
: I Il [ f) ;t~t1¥1C~. rdl{|}I It ~,~, ,,
!LAND : OTHER I
~ED. WAT. F~[I~HT ; VIA L~A i'~l~
LL ~ ~1~ I CA~IEn
' ~ TO
~ S/~ · W,~.
., ,
: .q,'N
PAkl NO. i),, .-- PRIC~' DI~-
COUNT
· ! ..... ;.... ~,. ]
I
' 'TOTAL P~R'I'~
~ · · ---,m.a~ I
Jori 'l'Ypi~
·
Wc;H~ROVi' i :.
8LIP,c,
13.OM PLi-': ,,,
LL/IJ.I IK'A ? .t
M Lqlr,/l'
f.'(tr.I I I t¢?1:
~'~.-~i~ ' ............~~ ' -" .~ .... .,,,,,~,: ,.~' '
. .-,.. ~.,
I
· ~.!11 _11 . i __ m , I 2
ISi~bkrO ...............
:
lGa~r .~ ,
'1 i -l' --' , -' _ ,. ;
~0 'd ZT:OT gO, g
iiii .... --
[ ~^'1 I.
I
11" WKM "TDU" Dual tubing t~nger
2 3/8" IBT 'Ibp & BTM
2" Type'"H" back pressure valv~ prep
Bore 1.935"
Assembly PN: 2221517-01-01
Assembly SN: 11043128~
r ~-,L ,I, / LO
6.'19
5.47'
"t
4.16
3.44
~1 000 A01 2:11.351S-~~. 1.ao ~
?Q20&2-04. i4 S. Off
~I'-IN, i D] ,CII-A-LV]I-N.A_,
~/ ,tO
I
WELLHEAD: 11" 5M WEll w/i! -~,~L Orig, KB · GL" 35' {NABORS 271:
2-711t" Brd TREE 'l'OP OONNE~TIMN
2.1/2' "H' P(~le. :
I
i
K-F~ Wek:l ~l ~ ·
: Camoo 2 718" x 1"
'-: ...... sk:lepo~ket KBMM
KOP ~11500' i GLM
M~x I.fl31e Angle; 69' ~ 40~' MD
) I
K-55 Butt ' -..
) ·
i r, idepocket KBMM
2L?/8' 6.,~ L.80 EUE ~ ,~. GLM
.0o~79 bbl,~. ,
,~3 ~,
2 718" XN Nipple
: ID 2.25' [ 5411'
.
~n~ff 204 ~g PC ~-~2~' I
; ~0 and 21 ~g
FCNPSH ~ 1:1 ~D 3~5'
: iC~n~iX~ ~ndem seal
. S~D ~E~~ ~M~Y Cen~l~ 57 HP KMH
~ZE SPF I~E~ ~D rotated fr~ 50 HP
12 S710'~722' ~'~'-3~5' KME-I l~50v/2~A
12 5742'~758' 3[ 20'~932' ~nt~lifl Hi~ Load PHD
I
~74'
I
12 ' S775'~Ta2' 3(45'-3~1' w~ ~x Fin Centralizer I
12 ~'~6' 3~55'~973'
~ 7' OTI~ W~T" VERSA-TRIEVE
· ~ ~ ~-S 3-1~ ~ ~ (154
lUU,,
s~ sPI ~.~.. ~vo ·. o-.~ s= Bom(z. TS'~D) I
. (lt. zoo')
5 5~2'~18 41~1'412~~ ~ OTIS'AW~ S~p ~r
3.~' X N~E (2.~13"1D)
4 ~ PBTDI 0221' I
:
ii
~TE ~V. a~ :
,. , ' .... MILNE POINT UNIT
~ ...~BR RWy. INSTALL ESPCP. WELL 1~2
0~23198
M.LI~m
,,.~o ~rs-s .. ,,
~~ ~, ~ R~O.~ ~s B~, ~PLO~TIqN tA~'
Tree Cap
Gate Valve
Handvhee! Operated
Blind Flange
,Z-9/16# SN
C~ons Studded 2-9/16"
r:~stmas742 Tree ~embl~
/,41232
x 2-9/!6
t&41232
Gate Velve
2-9t16"
HaIJdvheel Op~
·
746
~feldneck Flange
2-9/16" 5N
Oa~e Valve ~dapted for Ac
Baker Actuator v/ Do.et
Gate Valve 2-9/1b"
Hand~hee£ Operated
TubJ. ng Head Adapter
TubTng Head I &~173.5
{
Oumpanion FlanBe { ~1736
r~41734 SuI1PIu8 ~'~' 4~17~9
~ubing Hd. A~mbly/'veZve '
Plu~ {
~ { 441616 ~stn8 Ilead
~ 441619 Bull Plu8
' "161~d ~
Assembl "·
~ 441617.~panion ~an'
t ~1230 Grace Valv~
441359 Gate
~1617
COmpanion F~an{
~1750 rtut~!
I -B/8°
TT-~. ' .
~'~17~ l)iverter Head
FLOW CONTROL
= . ,[ 6(--OOZO , l_
W*Kdd PFt~
I
·
il
· rt~T FI~TIf',,G
I
P,~d~KOIT
~ ~.~ lNG HEAD
I
CAS 1 NG
· I .... .--iLl
FILE NO.
I ' I r II
=UeJJI~T
SHGETIOP
~,hl, N/A $,1
co.,- .~-,., CALCULATIONS
~ ..
'/.ZP- '
__
i
COT-'~M~.- H
CALCULATIONS
l o-octl
Milne Point Unit, AK.
TO: Hefley / Bixby
FROM: Jack Merrifield
Well Name: IMP I-O2
Main Category: I Information Only
Sub Category:
I
Operation Date: IOctober 17, 2002
Date: ]October 17, 2002
Purpose:
This well is being converted as a new Dual injector. During the demobe process
and RWO preparation the well was found to have communication between the
inner and outer annulus. The workover plan was continued and the program
was modified to repair the well and return to use as the planned dual injector.
The Casing was recovered where the failure had occurred. The AOGCC has
requested a clarification as to the cause of the failure. This Telex is to provide
that information and is based on my memory of the well. The exact dates are not
known but will be stated based on what l remember.
Sequence of Events:
11/01/92 to 03/30/93
The shallow oil sands of the Schrader Bluff reservoirs repeatedly hydrated and
froze off the tubing during production operations. The 1-02 well was equipped
with an ESP and the ESP pump failed prematurely due to no flow conditions
causing the motor to overheat when the tubing froze.
Conoco Corporate engineering developed a concept to use a Heated Tubing
System called Paratrol to attempt to prevent plugs from occurring in the tubing.
The Paratrol system was developed and dep!oyed in the lower 48 to clear
paraffin and asphaltine deposit from the interior walls of production tubing in
wells that had build up problems. In those wells the tubing was installed in strait
bore shallow wells primarily. The concept was to suspend the tubing from the
tubing hanger by utilizing an E-SUB. This device provided electrical insulation
from the wellhead. A heavy cable was run in to the well casing and attached to
the lower portion of. the E-SUB. To provide insulation qualities from the well
bore, the tubing was wrapped with a corrosion wrap and that wrap was non
conductive.
4 Paratrol Systems were purchased and the surface equipment was installed
and the workovers planned. Wells 1-01, 1-02, J-05, and J-07 were worked over
and a Paratrol system was installed with each. Upon activation the J-7 and the
1-02 Paratrol systems failed and were found shorted to ground.
The J-7 well ESP was started and the well produced adequate water production
to warm the tubing and prevented hydrates from forming. No attempt was made
to repair this system.
STATE OF ALASKA
ALASKA' OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Convert to Dual Injector
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 70'
3. Address [] Exploratory 7. Unit or Property Name
[] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
'4. Location of well at surface 8. Well Number
2948' SNL, 3756' WEL, SEC. 33, T13N, R10E, UM MPI-02
At top of productive interval 9. Permit Number / Approval No.
190-091 / 302-292 & 302-315
1569' SNL, 482' WEL, SEC. 33, T13N, R10E, UM 10. APl Number
At effective depth 50-029-22066-00
1515' SNL, 151' WEL, SEC. 33, T13N, R10E, UM 11. Field and Pool
At total depth Milne Poir~t Unit
1511' SNL, 125' WEL, SEC. 33, T13N, R10E, UM -C=,ands----'~'
12. Present well condition summary
Total depth: measured 6260 feet Plugs (measured)
true vertical 4312 feet
Effective depth: measured 6221 feet Junk (measured)
true vertical 4283 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 71' 13-3/8" 500 sx Parma Frost 'C' 106' 106'
Surface
Intermediate 2765' 9-5/8" 938 sx Parma Frost 'E', 254 sx 'E' 2800' 2384'
Production 6186' 7" 391 sx Class 'G' 6221' 4283'
Liner
Perforation depth: measured Isolated: 5710'- 5722', 5742' - 5758', 5775'- 5782', 5803'- 5826', 5898'- 5940', 5982' - 6018'
true vertical Isolated: 3898'- 3908', 3923' - 3934', 3948' - 3953', 3969' - 3987', 4041'- 4073', 5004' - 5131'
Tubing (size, grade, and measured depth) Dual Tubing - 2-3/8", 4.7#, L-80 tubing to 5879' and 2-3/8", 4.7#, L-80 tubing to 5989'.
Packers and SSSV (type and measured depth) 7' x 2-3/8" Baker GT Ret. Dual Packer at 5677' and at 5849'; 7" x 2-3/8" Baler FH Ret
Packer at 5_960'. ,, ......
13. Stimulation or cement squeeze summary
Intervals treated (measured) NOV 0 8 ~00~
Treatment description including volumes used and final pressure
Alaska 0il & Gas ~ns. Commission
Anchorage
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[][] CopieSDaily Report°f Logsof Welland SurveySoperationsrUn ~il [] Gas [] Suspended Service Water Injection X
17. I hereby certi~ for~ggoing is true and correct to the best of my knowledge
So Stewm Title Technical Assistant Date
Signed
~% ~ ~ ~% ~_ ~,~ ~ ~ ~ Prepared By Name/Number: Sondra Stewman, 564-4750
Form 10-404 Rev. 06/15/88 R B D M $ El F L NOV I 5 ~0,,_~ubmit In Duplicate
· BP EXPLORATION Page I of 4
Operations Summary Report
Legal Well Name: MPI-02
Common Well Name: MPI-02 Spud Date: 10/27/1990
Event Name: RECOMPLETION Start: 9/25/2002 End: 10/18/2002
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From-To Hours Task t Codel NPT Phase Description of Operations
9/23/2002 06:00 - 14:00 8.00 MOB P PRE MI/RU & SAFE OUT EQUIPMENT.
14:00 - 15:30 1.50 KILL P DECOMP RIG LINES TO TREE & TIGER TANK
15:30 - 16:00 0.50 WHSUR P DECOMP RIG LUB & PULL BPV
16:00 - 18:30 2.50 KILL P DECOMP CIRC WELL BORE INFLUX OUT OF WELL WITH HOT
SEAWATER & GET SITP & SICP & DISPLACE WELL WITH
10.2 PPG. BRINE.
18:30 - 19:00 0.50 WHSUR P DECOMP SET TWC
119:00 20:00 1.00 WHSUR P DECOMP NIPPLE DN TREE
20:00 - 22:00 2.00 BOPSUI~P DECOMP NIPPLE UP BOP
22:00 - 22:30 0.50 BOPSURrP DECOMP SAFETY MEETING WITH BP REPS FROM ANCHORAGE.
22:30 - 00:00 1.50 BOPSUR~P DECOMP BODY TEST & FUNCTION BOP TO 250~3500 (TEST WAIVED
!
BY JEFF JONES WITH AOGC)
- WHSURIP DECOMP PULL TWC
9/24/2002 00:00 00:30 0.50
00:30 - 14:00 13.50 PULL!P DECOMP POOH WITH ESP COMPLETION LAYING DN TBG. & ESP
EVAL N ASSY. & HEAT TRACE TAPE.
14:00 - 19:00 5.00 DFAL DECOMP RIH WITH HES PLUG & SET IN 7" VERS RETRIEVE PKR @
5520' & PRESSURE UP TO VERIFY PLUG IN PLACE &
INTEGRITY. (NOTE:CSG. LEAK ABOVE PREVENTED
POSITIVE TEST AT THIS TIME)
19:00 - 21:00 2.00 EVAL N DFAL DECOMP POOH & LAY DN SETTING TOOL
21:00 - 22:30 1.50 EVAL N DFAL DECOMP RIH WITH HES CHAMP PACKER & SET @ 1025' & PSI
DOWN TO 5520' VERSA-RETRIEVE PLUG @ 2000 PSI.
GOOD INTEGRITY.
22:30 - 00:00 1.50 EVAL N DFAL DECOMP POOH TESTING & ISOLATED LEAK IN 7" BETWEEN 285' &
463' & HAD POSSIBLE BY LEAK ON CHAMP PKR.
9~25~2002 00:00 - 07:00 7.00 EVAL N DFAL DECOMP RUN CHAMP & ISOLATE INTEGRITY FAILURE BETWEEN
285' & 463' PAKER WAS LEAKING BY VALVE, POOH&
CHG. TO 7" CHAMP PKR & ISOLATE INTEGRITY FAILURE
OF CSG. TO BE BETWEEN 407' & 422' POOH & LAY DN
RTTS.
07:00 - 09:30 2.50 CHEM N DFAL ABAN RIH WITH 3.5" DP TO 5500' & MU & SET R-I-rS @ 55' 4ES
KB
09:30 - 15:00 5.50 CHEM N DFAL ABAN REVERSE CIRC IN 65- BBL. DIESEL & U-TUBE TO DP. &
HAB&R RIG UP & FREEZE PROTECT 7" X 9-5/8" ANNULUS
DOWN TO LEAK VIA DP & U-TUBE FLUID AGAIN IN DP TO
ENSURE DP FREEZE PROTECTION OK(NOTE :WE WERE
UNABLE TO BULL ANY DIESEL DN 7" X 9-5~8" ANNULUS
BELOW THE LEAK.
15:00 - 18:00 3.00 TA N DFAL ABAN PREP RIG FOR WARM STACK
18:00 - 00:00 6.00 TA N ABAN STD. BY WITH CREWS.
10/11/2002 12:00 - 14:00 2.00 MOB N PRE START UP RIG FROM WARM STACK
14:00 - 23:00 9.00 BOPSUF.N DECOMP TEST BOP 250/2500 PSI. WITNESSED BY JEFF JONES
WITH AOGC (NOTE :HAD EXCESSIVE PROBLEMS
GETTING TEST PLUG TO MAKE SEAL. HAD TO
RE-INSTALL TBG. HANGER & TEST AGAINST IT BY
ENEGERIZER THE SEALS TO GET A POSITIVE SEAL.
23:00 - 23:30 0.50 DHEQP N DECOMP MU RET. TOOL & OPEN VALVE ON RTTS @ 50' & CHECK
PRESSURES & PULL RTTS TO FLOOR & LAY DN SAME.
23:30 - 00:00 0.50 CASE N DECOMP CIRC FREEZE PROTECTION DIESEL OUT WITH 10.2 PPG.
BRINE
10/12/2002 00:00 - 01:00 1.00 CASE N DECOMP ClRC FREEZE PROTECTION OUT OF WELL BORE.
01:00 - 03:00 2.00 CASE N DECOMP POOH WITH 3.5" DP.
03:00 - 04:30 1.50 FISH N DECOMP MU BAKER HYD. CUTTER & RIH & LOCATE CONNECTION
Printed: 11/5/2002 12:04:22 PM
' '" ' : ON Page 2 of 4
: ...... mmarY Report
Legal Well Name: MPI-02
Common Well Name: MPI-02 Spud Date: 10/27/1990
Event Name: RECOMPLETION Start: 9~25~2002 End: 10/1812002
Contractor Name: Rig Release:
Rig Name: Ri9 Number:
: Date: ' :From~TOlHours TaSk code' NpT ' Phase Description of Operations
10/12/2002 103-00. - 04:30 1.50 FISH N DECOMP @ 499' & PULL UP & CUT CSG. @ 476'
04:30 05:00 0.50 FISH N DECOMP POOH & LAY DN CUTTER
05:00 08:00 3.00 FISH iN DECOMP RIG CENTER SPEAR & LATCH CSG. & BOLDS & ATTEMPT
,J ,TO PULL CUT CSG. WAS NOT SUCCESSFUL
I
10:00 1.00 FISH N DECOMP CIRC HOT FLUID TO MELT POSSIBLE ICE PLUG IN OUTER
ANNULUS.
10:00 - 10:30 0.50 FISH N DECOMP PULL CUTTER TO 476' & RE-CUT CSG. ALL INDICATIONS
i WERE THAT CSG. ALREADY CUT
i10:30 - 11:30 1.00i FISH N DECOMP POOH & LAY DN CUTTER & MU CENTER SPEAR & LATCH
I : SAME. IN 7" & PIPE FREE.
11:30 - 12:30 1.00! FISH N DECOMP LAY DN 7" CSG. HOLE WAS FOUND IN JT. NO. 10 3-FT.
, ABOVE PIN ROUND ABOUT THE SIZE OF A LEAD PENCIL
I i i& ANALYZATION WAS MORE LIKE A ARCED SPOT FROM
I I ESP CABLE. (POSSIBLE)
12:30- 19:00 6.50i FISH N DECOMP MU BAKER BACKOFF TOOL & RIH & BACK OF STUB
i 6-ROUNDS & RELEASE BACKOFF TOOL & TOH & LAY DN
I BACK OFF TOOL & MU SPEAR & TIH TO CONNECTION @
499' & MU KELLY & BACK OUT CONNECTION & POOH &
' i RECOVER REMAINING CUT WITH PIN END.
19:00 - 20:00 I 1.00 FISHI N DECOMP RIH WITH BAKER MODEL G-LOCK PACKER & SET @ 561'
00 & POOH.
20:00 - 21:00 ! 1. CASE N DECOMP MU & RIH WITH 11-JTS. 7" 26~ L-80 BUTTRESS CSG. TO
499'
21:00 - 22:00 1.00 CASE N DECOMP FREEZE PROTECT OUT ANNULUS WITH 40- BBL. DIESEL
22:00 - 23:00~ 1.00 CASE N DECOMP MU CSG. CONNECTION @ 499' & TEST SAME TO 3000 PSI.
23:00 - 23:30 I 0.50 CASE N DECOMP RIG DN CSG. TOOLS
23:30 - 00:00 I 0.50 CASE N : DECOMP NIPPLE DN BOP'S FOR PICK UP TO SET SLIPS. WITH 60K
10/13/2002 00:00 - 02:30I 2.50 CASE N DECOMP PU BOP'S & SET SLIPS WITH 60K & CUT 7" &
i DRESS.STUB.
02:30 - 04:30 2.00 CASE N DECOMP INSTALL PACKOFF & INSTALL TBG. SPOOL & TEST TO
5000 PSI.
04:30 - 06:30 2.00 BOPSUF~ N DECOMP NIPPLE UP BOP'S & TEST SAME TO 3500 PSI.
06:30 - 08:00 1.50 PULL N DECOMP RIH & TO BAKER BRIDGE PLUG & CIRC DIESEL OUT 561'
, & PULL PLUG & LAY DN.
08:00 - 12:00 4.00 PULL N DECOMP RIH WITH HFS VST PLUG RETRIEVEABLE TOOL & LATCH
I & RELEASE PLUG @ 5513' (NOTE:CHG. OUT UPPER
II KELLY VALVE & TESTED TO 3500 PSI. ON TIH.
12:00 - 16:30 4.501 KILL N DECOMP CIRC OUT INFLUX & RAISE BRINE WT. TO 10.5 PPG. &
I, MONITOR SAME.
16:30
- 19:00 2.501 PULL N DECOMP POOH WITH HFS VST PLUG & LAY DN SAME.
19:00 - 22:30 3.50 FISH P DECOMP RIG SWS & RIH WITH STRING SHOT TO CLEAN SCALE
I 50 FROM 3.5" BLANK PIPE- & GET ON DEPTH & FIRE @ 5688'
22:30 - 00:00 . FISH P DECOMP MU SWS 2-5~8" CHEMICAL CUTTER
10/14/2002 00:00 - 02:00 2.00 FISH P DECOMP RIH WITH SWS 2-5/8" CU'I-I'ER & CUT 3.5" BLANK PIPE IN
SCREEN ASSY @ 5688' POOH & RIG DN SWS.
02:00 - 03:30 1.50 FISH P DECOMP MU HFS VERSA-RET. TOOL & RIH TO PKR @ 5513'
03:30 - 04:30 1.00 FISH P DECOMP LATCH PKR. WITH RET. TOOL & UNABLE TO RELEASE
PKR & RELEASE TOOL.
04:30 - 06:30 2.00 FISH P DECOMP POOH WITH HFS RET. TOOL & DISCOVER TOOL HAD
I , BACKED OFF AT 2-3/8" CONNECTION.
06:30 - 11:00 4.50 FISH P DECOMP RIH WITH HFS VERS-RET. TOOL +BUMPER
Printed: 1115/2002 12:04:22 PM
Page 3 of 4
;: :; :: ::oPerati°ns summary Report
: i :: : :: : : ::: : i ii: : : : i ::: :: :
Legal Well Name: MPI-02
Common Well Name: MPI-02 Spud Date: 10/27/1990
Event Name: RECOMPLETION Start: 9/25/2002 End: 10/18/2002
Contractor Name: Rig Release:
Rig Name: Rig Number:
:ii:Date: l:Fr°m; TO IHOurS : TaSk l:Code NPT :1 Phase Description of Operations
'
10/14/2002 06:30 - 11:00 4.50 FISH P DECOMP SUB+JARS+9-DC & MAKE SCREW IN & JAR ON PKR &
RELEASE SAME
11:00 - 14:30 3.50 FISH P DECOMP POOH WITH VERSA PKR & LAY DN SAME & 143' OFF
BLANK 3.5" PIPE. (HAD GOOD CHEMICAL CUT )
14:30 - 18:30 4.00 FISH DECOMP MU BAKER FTA OVER SHOT+RATTLER TOOL+BUMPER
, SUB+JARS+ 9-DC & RIH WITH SAME & LATCH 3.5" BLANK
i PIPE
18:30 - 22:30 4.00! FISH P DECOMP WORK RATTLER TOOL @ ALL POSITION & JAR ETC.
; UNABLE TO RELEASE SCREEN ASSY.
22:30 - 00:00 , 1.50 FISH P DECOMP RELEASE OVERSHOT & POOH & LAY DN FTA. RATTLING
I I TOOL.
10/15/2002 00:00 - 02:00 ! 2.00 FISH P DECOMP MU FTA SHOE+6-JTS. WASHPIPE+BUMPER
I
SUB+JARS+9-DC'S
02:00 - 05:00 3.00 FISH P DECOMP RIH & TAG FISH @ 5688'
05:00 - 06:00 1.00 FISH !P DECOMP WASH OVER SCREEN ASSY 5688' TO 5839' SUMP
PACKER & CIRC OUT SAND.
06:00 - 08:30 2.50 FISH I P DECOMP POOH & LAY DN WASH PIPE & CLEAN FLOOR
08:30 - 10:30 2.00 FISH P DECOMP MU OVERSHOT+BUMPER SUB+JARS+9-DC'S & RIH TO
15681'
10:30 - 11:00' I 0.50 FISH P DECOMP LATCH SCREEN ASSY & WORK FREE.
11:00 - 12:00 1.00 FISH P DECOMP POOH WITH FISH TO 3300' & GAS BUBBLE WORKED UP
DP.
12:00 - 13:00 1.00 FISH P DECOMP ClRC INFLUX OUT OF DP & MONITOR WELL (STATIC &
TAKING FLUID)
13:00 - 15:30 2.50 FISH P DECOMP POOH & LAY DN RECOVERED SCREEN ASSY.
15:30- 16:30 1.00 FISH P DECOMP MU FTA PACKER MILL W/PRT+ 3-BOOT
BASKETS+BUMPER SUB+JARS+9-DC'S
16:30- 18:30 2.00 FISH P DECOMP RIH & ENGAGE PKR.
18:30 - 19:30 1.00 FISH P DECOMP MILL PACKER @ 5843'
19:30 - 20:30 1.00 FISH P DECOMP CIRC. BOTTOMS UP & MONITOR WELL BORE.
20:30 - 23:30 3.00 FISH P DECOMP POOH & LAY DN RECOVERED PKR. & MILLING FTA.
23:30 - 00:00 0.50 CLEAN P DECOMP MU CLEAN OUT ASSY. BIT+7" CSG SCRAPER
10/16/2002 00:00 - 01:30 1.50: CLEAN P DECOMP RIH WITH BIT+SCRAPER+3-BOOT BASKETS+9-DC TO
5987'
01:30 - 03:00 1.50 CLEAN P DECOMP WASH DOWN TO 6107'
i03:00-04:30 1.50 CLEAN iP DECOMP REVERSE WELL CLN TO 10.3 PPG. BRINE.
i
04:30 - 07:30 ' 3.00 CLEAN P DECOMP POOH & LAY DN CLN-OUTASSY.
07:30 - 14:00 6.50 EVAL P DECOMP RIG SWS & RUN USlT LOG & FROM 6107' TO 5450' &
POOH & RIG DN SWS
14:00-21:30I 7.50 EVAL ~ DECOMP RIGHESCHAMPPACKER&RIHWlTHSAME&SET@
5960' & ESTABLISH INJECTION RATE INTO "CA" SAND @
' 3-BBL. BPM 1100 PSI. SEEN NO COMMUNICATION INTO
"OB" SAND, RESET PKR @ 5850' & ESTABLISH INJECTION
RATE INTO "OB" SAND AT 3-BPM 900 PSI. SEEN NO
COMMUNICATIONS INTO "N" SANDS (GOOD INTEGRITY)
CIRC WELL BORE TO CLN-FLUID &POOH & LAY 3.5" DP &
PACKER.
21:30 - 22:30 1.00 BOPSUR P COMP SET TEST PLUG & CHG RAMS TO 2-3~8" & TEST BREAK
TO 250~3500
22:30 - 00:00 1.50 RUNCOItF' COMP RIG TBG. TOOLS & RIH WITH LONG STRING OF 2-3/8"
TBG.
10/17/2002 00:00 - 04:00 4.00 RUNCOr P COMP PU & RIH WITH 180-JT. 2-3/8" TBG.
04:00 - 07:00 3.00! PULL P COMP POOH WITH 180-JTS. 2-3~8" TBG. AND STAND IN DERRICK
Printed: 111512002 12:04:22 PM
::: .... ::: i~: ::~ i i~ i : BP:EXPLORATION Page4of4
: : :
ii:: : :i: : OPerations :Summary Report
: : :: : i : : : : : :
Legal Well Name: MPI-02
Common Well Name: MPI-02 Spud Date: 10/27/1990
Event Name: RECOMPLETION Start: 9~25~2002 End: 10/18~2002
Contractor Name: Rig Release:
Rig Name: Rig Number:
~01~712002 04:00 - 07:00 I 3.00 ~ULL P COM~ IN PRFP TO RUN DUAL GOMPLI=TION
07:00 - ~ 1:00 I 4.00 RurqGoI~ COM~ PICK LIP 180- J-rS. 2-3/8" IBG. FRO~ PI~F SHFD 8, Rll-I
11 00 - 12:00I 1.00 PULL P COMP SLIP & CUT DRLG. LINE
12:00 14:00 2.00 PULL P COMP POOH WITH 180- JTS. 2-318" TBG. & STAND IN DERRICK IN
I~REP FOR DUAL COMPLETION.
14:00 - 15:30 1.50 BOPSURo~~i~ IcOMP 250/3500CHG' RAMS IN BOP TO DUAL 2-3/8" & TEST SAME TO
15:30 23:30 8.00 RUNC ~COMP RIG GR&R DUAL TBG. TOOLS & MU TRIPLE PACKER DUAL
{SOMPLETION & RIH TO 5975'
23:30 - 00:00 0.50 RUNCO~Pj .COMP RIG SWS
10/18/2002 00:00 02:00 2.00 RUNCOI~P COMP RUN SWS GR/CCL & CORRELATE IN PKRS. & RIG DOWN
I
SWS.
102:00 - 03:30 1.50~ RUNCOIVP COMP SPACE OUT & MU HANGER & LAND & RILDS & TEST
i SAME TO 5000 PSI.
~03:30 - 04:00 0.50: RUNCOr COMP RIG DOWN GB&R DUAL STRING TBG. TOOLS.
04:00 - 06:00 2.00 BOPSUF:P J COMP SET TWC'S & NIPPLE DOWN BOP & CHG. RAMS TO 2-7/8"
06:00 - 10:00 4.00 WHSUR PI COMP NIPPLE UP TREE & TEST SAME TO 5000 PSI. & RIG LUB &
PULL TWC'S
10:00 - 12:30 i 2.50 RUNCOI~I~ COMP ~REVERSE IN TREATED BRINE WITH COREXIT 100 BBL. &
i.~ FOLLOW WITH 90- BBL. DIESEL& U-TUBE TO BOTH TBS.
I Jl~ STRINGS.
112:30 - 16:00 3.50 RUNCO COMP DROP BALL IN LONG STRING & PUMP TO SEAT & TEST
i SAME TO 3000 PSI. FOR 30-MIN & SHEAR HYDRO-SUB @
I 3500 PSI. & BLEED TBG. PRESSURE & PRESSURE
! ANNULUS TO 2000 PSI. & MONITOR FOR 30-MIN (GOOD
[ TEST) & DROP BALL IN SHORT STRING & PUMP TO SEAT
& TEST SAME TO 3000 PSI. FOR 30-MIN OK. & ATTEMPT
16:00 - 17:00 1.00 RUNCO CO ,RIG UP ON LONG STRING & RE-FREEZE PROTECT WITH
,10 BBL. DIESEL.
17:00 - 18:00 1.00 RUNCO ' COMP I~IG'LUBRICATOR & SET BPV'S IN BOTH STRING &
SECURE TREE AREA. & RELEASE RIG FOR MOVE TO
JVIPE-09 @ 1800 HRS. 10/18/2002
I
I I
I
i
I
t
Printed: 111512002 12:04:22 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
.
.
.
Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well:
[] Development
[] Exploratory
[] Stratigraphic
[] Service
Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
Location of well at surface
2948' SNL, 3756' WEL, SEC. 33, T13N, R10E, UM
At top of productive interval
1569' SNL, 482' WEL, SEC. 33, T13N, R10E, UM
At effective depth
2916' SNL, 3691' WEL, SEC. 33, T13N, R10E, UM
At total depth
1511' SNL, 125' WEL, SEC. 33, T13N, R10E, UM
6. Datum Elevation (DF or KB)
KBE = 7O'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPI-02
9. Permit Number
190-091 / 302-292
10. APl Number
50- 029-22066-00
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
6260 feet Plugs (measured)
4312 feet
1025 feet Junk (measured)
1019 feet
HES Plug set in 7" Versa-Trieve Packer at 5517' (09/02)
HES Champ Plug at 1025' (09/02)
Length Size Cemented M D TVD
71' 13-3/8" 500 sx Perma Frost 'C' 106' 106'
2765' 9-5/8" 938 sx Perma Frost 'E', 254 sx 'E' 2800' 2384'
6186' 7" 391 sx Class 'G' 6221' 4283'
Perforation depth: measured
true vertical
Isolated: 5710'-5722',5742'-5758',5775'-5782',5803'-5826',5898'-5940',5982'-6018'
Isolated: 3898'-3908',3923'-3934',3948'-3953',3969'-3987',4041'-4073',5004'-5131'
Tubing (size, grade, and measured depth) None
Packers and SSSV (type and measured depth) 7" Otis 'VST' VERSA-TRIEVE packer at 5517' and a 7" Otis Sump packer at 5863'.
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program I~'S~et~ch
4. Estimated date for commencing operation
September 25, 2002 /
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Number:
Status of well classifications as: 0CT 0 2 2002
[]Oil [] Gas []Suspended
Service ~ Oil & Gas Cons. Commission
A_n_chomge
Prepared By Name/Numben Sondra Stewman, 564-4750
17. I hereby certify th~ is t. rue and correct to th, e~best of my knowledge
Signed Robe Drilling Engineer
Conditions of Approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Mechanical Integrity Test __ Subsequent form required 10-
Approved by order of the Commission
Form !Q-¢.0~ Rev...0.6/15/8~..
ORIGINAL SIGNED BY
D 'r"aylor,Seamounf · ~,,. : ,~ ~
Date
I Approval No.
Commissioner
Submit'In 1-riplicate
1-02
Please find in the following section a brief recap of the operations on 1-02 until the time
of suspending operations. Operations was suspended after we concluded that the 7"
casing had a leak. There was no 7" casing on the slope on the time of operations, so we
suspended operations with the rig over the well until we come back on October 11. We
will then fix the casing leak and continue with the planned recompletion as per the
Sundry (approval number 302-292)
Recap of operations:
1. MI/RU & SAFE OUT EQUIPMENT.
2. RIG LINES TO TREE & TIGER TANK
3. RIG LUB & PULL BPV
4. CIRC WELL BORE INFLUX OUT OF WELL WITH HOT SEAWATER &
GET SITP & SICP & DISPLACE WELL WITH 10.2 PPG. BRINE.
5. SET TWC
6. NIPPLE DN TREE
7. NIPPLE UP BOP
8. SAFETY MEETING WITH BP REPS FROM ANCHORAGE.
9. BODY TEST & FUNCTION BOP TO 250/3500 (TEST WAIVED BY JEFF
JONES WITH AOGC)
10. PULL TWC
11. POOH WITH ESP COMPLETION LAYING DN TBG. & ESP ASSY. & HEAT
TRACE TAPE.
12. RIH WITH HES PLUG & SET IN 7" VERS RETRIEVE PKR @ 5520' &
PRESSURE UP TO VERIFY PLUG IN PLACE & INTEGRITY. (NOTE:CSG.
LEAK ABOVE PREVENTED POSITIVE TEST AT THIS TIME)
13. POOH & LAY DN SETTING TOOL
14. RIH WITH HES CHAMP PACKER & SET @ 1025' & PSI DOWN TO 5520'
VERSA-RETRIEVE PLUG @ 2000 PSI. GOOD INTEGRITY.
15. POOH TESTING & ISOLATED LEAK IN 7" BETWEEN 285' & 463' & HAD
POSSIBLE BY LEAK ON CHAMP PKR.
16. RUN CHAMP & ISOLATE INTEGRITY FAILURE BETWEEN 285' & 463'
PAKER WAS LEAKING BY VALVE, POOH& CHG. TO 7" CHAMP PKR &
ISOLATE INTEGRITY FAILURE OF CSG. TO BE BETWEEN 407' & 422'
POOH & LAY DN RTTS.
17. RIH WITH 3.5" DP TO 5500' & MU & SET RTTS @ 55' 4ES KB
18. REVERSE CIRC IN 65- BBL. DIESEL & U-TUBE TO DP. & HAB&R RIG UP
& FREEZE PROTECT 7"X 9-5/8" ANNULUS DOWN TO LEAK VIA DP & U-
TUBE FLUID AGAIN IN DP TO ENSURE DP FREEZE PROTECTION
OK(NOTE :WE WERE UNABLE TO BULL ANY DIESEL DN 7" X 9-5/8"
ANNULUS BELOW THE LEAK.
19. PREP RIG FOR WARM STACK /
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request: Abandon_ Suspend_ 'Operational shutdown _ Re-enter suspended well' '_' Conversion
Conversion from Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Prod to Inject
Prod to Inject Well Change approved program _ Pull tubing _ Vadance _ Perforate _ Other_X
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__X RKB 70.0 feet
3. Address Exploratory__ 7. Unit or Property name
P. O. Box 196612 Stratigraphic __
Anchorage, AK 99519-6612 Service__ Milne Point Unit
4. Location of well at surface 8. Well number
2948' FNL, 3756' FEL, Sec. 33, T13N, R10E, UM (asp's 551614, 6009447) MPI-02
At top of productive interval 9. Permit number / approval number
1569' FNL, 482' FEL, SEC 33, T13N, R10E, UM (asp's 554875, 6010849) 190-091
At effective depth 10. APl number
1515' FNL, 150' FEL, Sec. 33, T13N, R10E, UM (asp's 555206, 6010905) 50-029-22066-00
At total depth 11. Field / Pool
1511' FNL, 125' FEL, Sec 33 T13N, R10E, UM (asp's 555232, 6010909) Milne Point Unit / Schrader Sands
12. Present well condition summary
Total depth: measured 6260 feet Plugs (measured)
true vertical 4312 feet
Effective depth: measured 6221 feet Junk (measured)
true vertical 4283 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 71' 13-3/8" 500 sx Perma Frost 'C' 106' 106'
Intermediate 2765' 9-5/8" 938 sx Perma Frost 'E', 2800' 2384'
254 sx 'E'
Production 6186' 7" 391 sx C;ass 'G' 6221' 4283'
Perforation depth: measured Open Perfs behind Screen 5710'-5722', 5742'-5758', 5775'-5782', 5803
Open Perfs below Sump PKR 5898'-5940', 5982'~6018'
true vertical Open Perfs behind Screen 3896'-3905', 3920'-3932', 3945'-3951', 3955'-3~
Open Perfs below Sump PKFI 4038'-4069', 4101'-4129'
Tubing (size, grade, and measured depth 2-7/8", 6.5#, L-80 TBG @ 5424' MD. Bottom of EPS pump unit @~,~ ~.:~ ~'
Packers & SSSV (type & measured depth) 7" Otis 'VST' VERSA-TRIEVE @ 5517', 7" Otis 'AWD' Sump PKR @ 5863'.
2-7/8" x 1"Camco sidepocket KBMM GLM @ 131'
13. Attachments Description summary of proposal _X Detailed operations program __ BOP sketch __
14. Estimated date for commencing operation 15. Status of well classification as:
October 16, 2002
16. If proposal was verbally approved Oil _ Gas _ Suspended
Name of approver Date approved Service WATER INJECTION
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Scan Petersen @ 564-5025.
Signed ~ ~" ~ Title: Milne Point Production Engineer Date September 06, 2002
Sean Petersen Prepared by DeWaTne R. Schnorr 564-5174
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness,IApproval ,o.=
Plug integrity_ &OP Test _~, Location clearance__ ~ ~ ¢ Z
Mechanical Integrity Test ~ . Subsequent form required 10-
Approved by order of the Commission On~lnal Si~Fi~,,~, Commissioner . Date
CammvOechsliTavt~ ...... ~GANNED I)i;i A 4 ?AA? ' ' '
Form 10-403 Rev 06/15/88 ·
SUBMIT IN TRIPLICATE
bp
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 06, 2002
Winton Aubert
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Dear Winton:
Re: Sundry Notice for MPI-02 Producer to Injector Recompletion
BP Exploration Alaska, Inc. proposes to recomplete MPI-02 from a failed ESP
producer (N, OA and OB sands) to a dual string injector (OA and OB Sands)
similar to those at S-Pad. MPI-02i will support MPI-04A, MPI-15, MP03, and
MPI-07.
MPI-02i was drilled, cased, and completed as an Schrader Bluff producer in
June 1991 by Nabors 27E. The N ands are behind screens, and the OA and
OB sands are perforated without sand control. The last ESP failed in April 2002
after approximately one year of production.
MPI-02's location makes it an ideal candidate for a conversion to a dual injector
to support the OA and OB multilaterals MPI-04A and MPI-15 (recent grass roots
well). These wells are the two major producers in this hydraulic unit, and they
will benefit from this injection support.
Note: The current injector in the hydraulic unit, MPI-05i, injects into the
N, OA and OB sands. The plan for MPI-05i is to isolate the OA and OB
sands, making MPI-05i an N-Sand only injector. After this work is
completed, will be able to control injection into each sand, which will help
in reservoir management. The work package proposal for MPI-05 will be
submitted separately.
If you have any questions concerning this Sundry Application, please don't
hesitate to call me at 564-5025, home 349-3098, or e-mail me at
mailto:peterssd(~bp.com
Sincerely,
5~- o~
Sean Petersen 0~1 ~ & %%%%
Milne Point Unit - Schrader Bluff Production Engine~~~0
Well MPI-02 C, ~nt Status'
· Failed ESP Producer since April 2002
Order of Operations:
.
2.
3.
4.
5.
6.
.
8.
9.
10.
11.
12.
13.
MIRU 4ES
Kill well
Remove ESP completion
Mill and pull screens over N-Sands
FCC to PBTD
Run a CBL to verify sufficient cement for isolation between CA sands, OB
sands and surface
a. Perform a cement squeeze if necessary
Test for channels behind pipe
Run Dual Completion
Obtain a state witness of MITIA
RDMO Work Over Rig.
Complete installation of surface facilites
Begin injection into the Schrader Bluff sands
Injection profiles should not be required since each injection string is
injecting into an isolated zone
Well MPI-02 k..../rent Status:
· Failed ESP Producer since April 2002
Order of Operations:
1. MIRU 4ES /'
2. Kill well /
3. Remove ESP completion
4. Mill and pull screens over N-Sands
5. FCO to PBTD /-~'
6. Run a CBL to verify sufficient cement for isolation between OA sands, OB
sands and surface
a. Perform a cement squeeze if necessary
7. Test for channels behind pipe
8. Run Dual Completion
9. Obtain a state witness of MITIA
10. RDMO Work Over Rig.
11. Complete installation of surface facilites
12. Begin injection into the Schrader Bluff sands
13. Injection profiles should not be requi~d since each injection string is
injecting into an isolated zone
SCANNED OCT 0 4 2002
3PUD DATE:
ZiG RELEASE· ·
~'~C~:CAL T~U~.iT~ ~,.E?OET ·
DATA
Casing: 7
Shoe: ~Zg.t MI) ~.~:'I'VD, DV: ---~ ~ -TV'D
Liner: Shoe:
¥~"
Tub4~: ~' Packer
::ole Size ~'lZ and
iNTEGRITY - PAiRT ~!
Annulus Press Test:
Co~ents:
; !5 rain ; 30 min
iNTEGRITY- PART ~2
Cemen~ Volumes:- Ant. Liner ; Csg 5qJSfL ; DV .
Theoretical TOC
Cement Bond Log (Yes or No) ~ ; In AOGCC File
CBL Evaluation, zone above perfs C 0~ ~'~'u-M, ~'~ ~J
Production Log: Type
; Evaluation
, .:.
coN~:LUSiONS: ':':.
· .
Part
t
'
STATE OF ALASKA
ALASKA _ .,.. AND GAS CONSERVATION COMIv,,_.,&ION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Change Out ESP
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 70'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
2948' SNL, 3756' WEL, SEC. 33, T13N, R10E, UM MPI-02
At top of productive interval 9. Permit Number / Approval No.
190-091
1569' SNL, 482' WEL, SEC. 33, T13N, R10E, UM 10. APl Number
At effective depth 50-029-22066-00
1515' SNL, 150' WEL, SEC. 33, T13N, R10E, UM 11. Field and Pool
At total depth Milne Point Unit / Kuparuk River
1511' SNL, 125' WEL, SEC. 33, T13N, R10E, UM Sands
12. Present well condition summary
Total depth: measured 6260 feet Plugs (measured)
true vertical 4312 feet
Effective depth: measured 6221 feet Junk (measured)
true vertical 4283 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 71' 13-3/8" 500 sx Perma Frost 'C' 106' 106'
Surface
Intermediate 2765' 9-5/8" 938 sx Perma Frost 'E', 254 sx 'E' 2800' 2384'
Production 6186' 7" 391 sx Class 'G' 6221' 4283'
Liner
Perforation depth: measured Open: 5710' - 5722', 5742' - 5758', 5775' - 5782', 5803' - 5826', 5898' - 5940', 5982' - 6018'
true vertical Open: 3898' - 3908', 3923' - 3934', 3948' - 3953', 3969' - 3987', 4041' - 4073', 5004' - 5131'
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 tubing to 5474'
Packers and SSSV (type and measured depth) 7" Otis 'VST' VERSA-TRIEVE packer at 5517' and a 7" Otis Sump packer at 5863'.
13. Stimulation or cement squeeze summary ! \ L_ V C L.,J
Intervals treated (measured)
Treatment description including volumes used and final pressure
Al~ka Oil & Gas Cons. Commission
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service
"i7. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Sondra ~,.,~~ ~.%.,..~Titl~"'~~cz~,_( ,.~-~C%-~r~-' Date ~)~L~ q-~ [-'(.._~ [
Prepared By Name/Number: Sondra Stewman, 564-4750
Form 10-404 Rev. 06/15/88
Submit In Duplicatetete~
Legal Well Name: MPI-02
Common Well Name: MPI-02 Spud Date: 10/27/1990
Event Name: WORKOVER Start: 4/3/2001 End: 4/6/2001
Contractor Name: NABOR$ Rio Release: 4/6/2001 Group: RIG
Ri~ Name: NABOR8 4E8 Rio Number: 4
:::::~: ~/: ~~~ ~~ ~.:.~::~,,,..:,ub~:~:'~'~S~ '~::~::~:.:~: : Phase : ·: ' Description of Operations
: ~?::~Od~:.;:: :~::::~::~::~::~:.~ ..::.::::..... · ...
4/3/2001 15:00 - 23:30 8.50 RIGU PRE MOVE RIG FROM MPG-11 TO MPI-02 & RIG UP SAME.
23:30- 00:00 0.50 KILL DECOMP BERM PITS
4/4/2001 00:00 - 01:00 1.00 KILL DECOMP Berm and spot tiger tank Rig up lines to tree and Tiger Tank
01:00 - 02:00 1.00 KILL DEOOMP Pull BPV and fill pits with 9.3 ppg fluid
02:00 - 05:00 3.00 KILL DECOMP Test lines to 3,500 psi. 390 psi SITP and 480 psi SICP. opened choke
and began well kill at 3 BPM. Pumped 31 bbls down tubing, S I Casing
and bullheaded 26 bbls at 3 bpm at 2000 psi. Opened choke and
continued to circulate. Pumped a total of 245 bbls of 9.3 ppg brine and
circulated 180 bbls of oil to the tiger tank. Final circulating pressure
1400 psi at 3 bpm.
05:00 - 06:00 1.00 KILL DECOMP Monitor well
06:00 - 07:30 1.50 WHSUR DECOMP SET ~C & TEST & ND TREE.
07:30 - 10:00 2.50 BOPSUF DEGOMP NIPPLE UP BOP
10:00 - 12:00 2.00 BOPSUR DECOMP PRESSURE TEST BOP TO 250 LOW & 3500 HIGH (TEST WAIVED
BY CHUCK SHEVE WITH AOGC) & PULL ~C.
12:00 - 00:00 12.00 PULL DEGOMP PULL HANGER TO FLOOR & CHECK OUT SAME & POOH WITH
COMPLETION REMOVING ESP & HEAT T~CE.
4/5/2001 00:00 - 02:30 2.50 PULL DECOMP ~Y DOWN ESP EQUIPMENT.
02:30 - 00:00 21.50 RUNCO~ COMP MAKE UP ESP ASSY & RIH WITH SAME INSTALLING HEAT T~CE
& ACCESSORIES.
41612001 00:00 - 03:00 3.00 RUNCO~ COMP CONTINUE TO RIH & SPLICE ESP CABLE & HEAT T~CE & ~ND
HANGER & RILDS.
03:00 - 04:30 1.50 BOPSUF COMP SET ~C & TEST & ND BOP
04:30 - 06:00 1.50 WHSUR COMP NIPPLE UP TREE & TEST TO 5000 PSI. & SECURE TRE AREA. RIG
RELEASED ~ 0600 HRS. 41612001
Printed: 4/12/2001 9:36:15 AM
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
Julie HeUsser'
Commissioner
FROM: Chuck Scheve; SUBJECT:
Petroleum Inspector
DATE: April 22, 2001
Safety Valve Tests
Milne Point Unit
J& I Pads
Sunday Aprj! 22, 20.0t..: I traveled to BPXs MPU J & I Pads and witnessed the semi
annual safety valve system testing.
As the attached AOGCC Safety Valve System Test Report indicates I witnessed the
testing of 17 wells and 34 components with no failures. Lee Hulme performed the
testing today; he demonstrated good test procedures and was a pleasure to work
with.
I also inspected the well houses on these pads during the SVS testing. All
the wellhouses were very clean and the equipment appeared to be in excellent
condition.
Summary: I witnessed SVS testing at BPXs MPU J & I Pads.
MPU J Pad, 11wells 22 Components 0 failures
MPU I Pad 6wells 12 components 0 failures
23 wellhouse inspections
Attachment: SVS MPU J Pad 4-22-01 CS
SVS MPU I Pad 4-22-01 CS
X Unclassified Confidential (Unclassified if doc. removed )
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Lee Hulme
AOGCC Rep: Chuck Scheve
Submitted By: Chuck Scheve Date:
FieldfLlnit/Pad: Milne Point / MPU / I Pad
.
Separator psi: LPS 140 HPS
4/22/01
Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J,
Number Number PSI PSI... T.rip Code Code Code Passed GAS or CYCLE
i'o~ ' ' ~ ~9oo90o ...............
1-62' 1900910' 140 '100..... 95 '"P P ....... oil
1-03 i 900920 ~ 40~ oo9s P P om
~-'04 ' ' '~900930 ' 'i40 ~00 '~9s p "p ' ' om
~-06 '~97'~950 '~40 "~00 ' 9~P' P ......... 6i~
~:07' ~9~'i0 '" ~40"i009~' P....... P ' om
~0~ ' ~97i920 ~i40 i00 '9~ 'P P ..... 0m
,, , ,, ~., , , , , , , ~, , , i ,
, , , , ,, ,,~, ,, , ,, ,, ,
Wells: :6 Components: 12 Failures: 0 Failure Rate: 0.00% []]90
Remarks:
RJF 1/16/01 Page 1 of 1 SVS MPU I Pad 4-22-01 CS
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX Submitted By: Chuck Scheve Date: 4/22/01
Operator Rep: Lee Hulme Field/Unit/Pad: Milne Point / MPU / J Pad
AOGCC Rep: ..... Cl~k Scheve'~ ~ Separator psi: LPS ' ~ 140 '" HPS
Well permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ,
Number Number PSI PSI , , . Trip Code ,.,C°de Code Passed GAS or CYCLE
J-01A 1991110 140 100 95 P P OIL
J-03 1900970 140 100i 951 P P OIL
~,04 1900980~ '140 100 " ~5~' P ' P ........... 0IL
~-'05 1910950' 'i40' 100 '' 9'5 "P" P ...... 0iL
J-06'" 1940950'" 140
J'O7 1910970 140 100 95 P P OIL
j-08A 199117b 140 100 ' 95' ' P .... P .... oIL
j-09A ...... 199'1140 ..... 140 100 110 " p p .... I ..... OIL
J-10 1941100 140 100 95 P P OIL
J. 1i.. 1941'140 .........................
J-12 1941180
..
J- 18 1972200
J-lVA 1951700 ......
j~2'o ..... 1972150 .........................
J-21 ' "1972000 'i40
!~j-22 1981240 140 100 95 P P OIL
J-23 2001200
Wells: . . ~ 11, Components: 22 Failures: 0 Failure Rate: 0.00% [3 9o var
Remarks:
RJF 1/16/01 Page 1 ofl SVS MPU JPad 4-22-01 CS
THE MATERIAL UNDER THIS COVER HAS BEEN
M.ICROFILMED
ON OR BEFORE
OCTOBER 27 2000
E
E
C:LORBMFILM.DOC
PL E W
M A T E R IA L U N D ER
TH IS M ARK ER
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
[] Operation Shutdown F~ Stimulate I--J Plugging I-~ Perforate
[~3 Pull Tubing [] Alter Casing [] Repair Well [~ Other
ESP Changeout
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
99519-6612
4. Location of well at surface
2948' SNL, 3756' WEL, Sec. 33, T13N, R10E
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 52'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPI-02
9. Permit Number / Approval No.
90-91
10. APl Number
50- 029-22066
At top of productive interval
1568' SNL, 492' WEL, Sec. 33, T13N, R10E
At effective depth
1526' SNL, 233' WEL, Sec. 33, T13N, R10E
At total depth
1510' SNL, 129' WEL, Sec. 33, T13N, R10E
11. Field and Pool
Milne Point Unit / Schrader Bluff
12. Present well condition summary
Total depth: measured 6260'
true vertical 4309'
Effective depth: measured 6138'
true vertical 4218'
Casing Length
Structural
Conductor 71'
Surface 2765'
Intermediate
Production
Liner 6186'
feet Plugs (measured)
feet
feet Junk (measured) ~"~
feet
Al~ 0il & Gas Cons, Commi~i~
Size Cemented .~1~0E1~¢~ MD TVD
13 3/8" 500 Sxs PermaFrost C 106' 106'
9 5/8" 938 Sxs PermaFrost E/254 Sxs E 2800' 2384'
7" 391 Sxs G 6221' 4280'
Perforation depth:
measured
true vertical
5710' - 5722', 5742' - 5758', 5775' - 5782', 5803' - 5826', 5898' - 5940', 5982' - 6018'
(Subsea) 3828' - 3838', 3853' - 3865', 3878' - 3883', 3899' - 3917', 3971' - 4003', 4034' - 4061'
Tubing (size, grade, and measured depth) 2 7/8" 6.5# L-80 to 5407'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
Intervals treated (measured)
7" Otis "VST" Versa-Trieve packer at 5517'and a 7" Otis "AWD" Sump Packer at
5863'.
Treatment description including volumes used and final pressure
ORIGINAL
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments 16. Status of well classifications as:
E~ Copies of Logs and Surveys run [] Oil [] Gas I'-I Suspended
[] Daily Report of Well Operations
17'.' I hereby (~el~'i~ that ihe f0r~going is true and correct t9 the best of my knowledge
Jeancj~Vl_. Haas Title Staff Technical Assistant
· E~ Prepared By Name/Number:
Service
Date
Jeanne L, Haas, 564-5225
Progress Report
Facility M Pt I Pad
Well MPI-02 Page 1
Rig Nabors 5S Date 13 April 98
Date/Time
09 Mar 98 06:00-06:15
06:15-18:00
18:00-06:00
10Mar 98 06:00-16:00
16:00-18:00
18:00-18:30
18:30-01:00
11 Mar 98 01:00-03:00
03:00-05:00
05:00-06:00
06:00-09:00
09:00-10:00
10:00-13:00
13:00-14:30
14:30-18:00
18:00-22:00
22:00-02:30
12 Mar 98 02:30-03:30
03:30-06:00
06:00-12:30
12:30-18:00
18:00-19:30
19:30-21:00
21:00-00:15
13 Mar 98 00:15-01:00
01:00-05:00
06:00-07:30
07:30-11:30
11:30-12:30
12:30-18:00
18:00-22:00
22:00-00:15
14 Mar 98 00:15-04:30
04:30-06:00
06:00-08:00
08:00-10:00
10:00-13:00
13:00-18:00
18:00-06:00
15 Mar 98 06:00-13:00
13:00-14:00
14:00-18:00
18:00-20:00
20:00-21:30
21:30-00:15
16 Mar 98 00:15-01:15
01:15-02:00
02:00-06:00
Duration
1/4 hr
11-3/4 hr
12hr
10hr
2hr
1/2 hr
6-1/2 hr
2hr
2 hr
1 hr
3 hr
liar
3 hr
1-1/2 hr
3-1/2 hr
4 hr
4-1/2 hr
lhr
2-1/2 hr
6-1/2 hr
5-1/2 hr
1-1/2 hr
1-1/2 hr
3-1/4 hr
3/4 hr
4 hr
1-1/2 hr
4 hr
1 hr
5-1/2 hr
4 hr
2-1/4 hr
4-1/4 hr
1-1/2 hr
2 hr
2 hr
3hr
5 hr
12hr
7 hr
1 hr
4 hr
2hr
1-1/2 hr
2-3/4 hr
1 hr
3/4 hr
4 hr
Activity
Held safety meeting
Rig moved 100.00 %
Rig moved 100.00 %
Held safety meeting
Circulated at 5374.0 ft
Held safety meeting
Circulated at 5374.0 ft
Removed Xmas tree
Rigged up All rams
Tested All rams
Tested All rams
Removed Tubing hanger
Removed Tubing hanger
Rigged up Tubing handling equipment
Pulled Tubing in stands to 850.0 ft
Pulled Tubing in stands to 3150.0 ft
Pulled Tubing in stands to 5400.0 ft
Laid down 5439.0 ft of Tubing
Conducted slickline operations on Slickline equipment - Tool run
Conducted slickline operations on Slickline equipment - Tool run
Conducted slickline operations on Slickline equipment - Tool run
Ran Tubing to 0.0 ft (2-7/8in OD)
Ran Tubing in stands to 0.0 ft
Ran Tubing in stands to 5517.0 ft
Circulated at 5517.0 ft
Pulled Tubing in stands to 0.0 ft
Ran Tubing to 660.0 ft (1-1/4in OD)
Ran Tubing in stands to 5517.0 ft
Circulated at 5517.0 ft
Ran Tubing to 5981.0 ft (2-7/8in OD)
Ran Tubing to 6115.0 ft (2-7/8in OD)
Circulated at 6115.0 ft
Pulled Tubing in stands to 0.0 ft
Serviced ESP
Serviced ESP
Ran Tubing in stands to 1952.0 ft
Rigged up sub-surface equipment - Other sub-surface equipment
Ran Tubing in stands to 2850.0 ft
Ran Tubing in stands to 4600.0 ft
Ran Tubing in stands to 5452.0 ft
Ran Tubing to 5452.0 ft (2-7/8in OD)
Ran Tubing to 5452.0 ft (2-7/8in OD)
Installed Tubing hanger
Removed BOP stack
Installed Xmas tree
Freeze protect well - 75.000 bbl of Diesel
Cleared Flowline
Rig moved 0.00 %
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging~
Pull tubing x Alter casing __ Repair well
Perforate__
Other__
2. Name of Operator
BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2948' FNL, 3756' FEL, SEC. 33, T13N, RIOE
At top of productive interval
1568' FNL, 492' FEL, SEC. 33, T13N, RIOE
At effective depth
1526' FNL , 233' FEL, SEC. 33, T13N, R IOE
At total depth
1510' FNL, 129' FEL, SEC. 33, T13N, RIOE
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
ORIGINAL
6. Datum elevation (DF or KB)
KBE = 70' feet
7. Unit or Property name
Mi/ne Point Unit
8. Well number
MPI-02
9. Permit number/approval number
90-91
10. APl number
50- 029-22066
11. Field/Pool
Kuparuk River / Scrader Bluff
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
6260 feet Plugs (measured) None
4308 feet
6138' feet Junk (measured) None
4293 feet
Casing Length Size Cemented
Structural
Conductor 71' 13-3/8" 500 sxs. PermaFC
S u rface 2765' 9-5/8" 938 sxs. PermaFE
Intermediate
Production 6186' 7" 391 sxs. G
Liner
Perforation depth: measured 5710'- 5722' 5803'- 5826' 5982'- 6018'
5775'- 5782' 5898'- 5940'
true vertical 3895'- 3904' 3966'- 3983' 4101'- 4128'
3945'- 3950' 4038'- 4069'
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 EuE 5482' MD
Measured depth
106'
2800'
6221'
True vertical depth
106'
2384'
4280'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary N/A
Intervals treated (measured) N/A
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 237 9 4 3 250
250
Subsequent to operation
19 7 8 2 16 250 250
15. Attachments I 16. Status of well classification as:
Copies of Logs and Surveys run
I
Daily Report of Well Operations ~ Oil x Gas__ Suspended _
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
1~' '-' -~ v 06/15/88 ~ ""'"'~ -~''/ Title Wells Operation Superintendent
Form
Service
Date
SUBMIT IN DUPLICATE
MP 1-02
Operations Summary
o
,
°
o
Pre-rig: Install dummy valve in the GLM. Freeze protect the well and install BPV.
Remove wellhouse and flowline.
MIRU Polar 1 pulling unit. Kill well with heated kill weight fluid before ND_NU.
Pull existing 2-7/8" tubing and ESPCP completion.
Perform slickline TD tag. To verify no fill.
Run a new ESPCP on 2-7/8" L-80 tubing and heat trace through
permafrost.
Freeze protect well. ND BOP and NU tree. RDMO Polar 1.
Put well on production.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David Johns~,'
Chairman ~ ~
THRU: Blair Wondzell, ~~ FILE NO:
P. !. Supervisor ~ I¢,..q96
DATE: jUNE 23, 1996
aw91fwdd.doc
FROM: John Spaulding,~r SUBJECT'
Petroleum Insp'.'Jean
BOPE Test Polar 1
BPX MPU well 1-02
Kuparuk River Field
PTD ¢O ~ Oc~/
Sunday June 23, 1996' I traveled this date to BPX's Milne Point Unit to witness
the BOPE Test on Polar Energy's rig 1. The AOGCC test report is attached for
reference.
The rig has been shut down waiting to receive and install the correct gas
detection system, both LEL and H2S. I was at the rig and witnessed the final
installation and calibration by Mike Kisser of Alaska Petroleum Contractors. Mr.
Kisser is certified in the installation and calibration procedures. The calibration
forms are attached.
The rest of he BOPE test went well with 2 failures observed, 1on the kill line and
I floor valve. These items were repaired or replaced and testing was continued.
The area around the rig although quite small was well layed out with good
access.
Summary: I witnessed the BOPE test on Polar rig 1 with 2 failures, 3 hour test
time.
Attachments: aw91fwdd.xls
Calibration forms (APC)
Unclassified Confidental (Unclassified if document removed)
Confidentai
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size: 7"
Test: Initial
Workover: X
Polar Energy Rig No.
BP Exploration
MPI.02
X
Set @
Weekly
6,260
Other
I PTD #
Rep.:
Rig Rep.:
Location: Sec.
DATE:
Rig Ph.#
Dave Hildreth
6/23/96
659-2782
Gordon Ross
T. R. Meridian
TEST DATA
MISC. INSPECTIONS:
Location Gen.: ok
Housekeeping: ok (Gen)
PTD On Location yes
Standing Order Posted yes
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign yes
Drl. Rig ok
Hazard Sec. yes
Quan. Test Press. P/F
1 300/2,500 P
N/A 250/3,000
1 250/3,000 P
I 250/3,000 P
3 250/3,000 P
1 250/3,000 P
2 250/3,000 P
N/A
MUD SYSTEM: Visual Alarm
Trip Tank ok ok
Pit Level Indicators ok ok
Flow Indicator ok ok
Math Gas Detector ok ok
H2S Gas Detector ok ok
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Quan
Test
Pressure
250/5,000
P/F
250/5,000
2 300/3, 000 P
250/5,000
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
16
Test
Pressure P/F
250/5,000 P
42 250/5, 000 P
2 P
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's: N/A
3,000 P
2,050 P
minutes 15 sec.
minutes 58 sec.
YES Remote: Need
Psig.
· ~ TEST RESULTS
Number of Failures: 2 ,Test Time: ~ ~ours. Number of valves tested 23 Repair or Replacement of Failed
Equipment will be made within O ~ Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Smafl leak on kill line - repaired and continued testing; Leak on floor valve replaced and continue testing.
PVT & flow show was serviced,'"Hydril re-sealed and serviced,"'Accumulator was serviced and K-valve for hydril was repaired.
LEL & H2S equipment was installed and certified by APG Fire & Safety (Mike Kisser) 6-23-96 8am
Distribution:
orig-Well File
c - Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
John H. Spaulding
FI-021L (Rev. 12/94) AW9LFWDD.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate ~ Plugging__ Perforate ....
Pull tubing x Alter casing m Repair well m Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2948' SNL, 3756' WEL, SEC. 33, T13N, RIOE
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 70'
7. Unit or Property name
Milne Point Unit
8. Well number
MPI-02
At top of productive interval
1568' SNL, 492' WEL, SEC. 33, T13N, RIOE
At effective depth
At total depth
1510' SNL, 129' WEL, SEC. 33, T13N, RIOE
9. Permit number/approval number
90-9 I/Conservation order 347
10. APl number
50- 029-22066
11. Field/Pool
Schrader Bluff
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured
6260 feet
4309 feet
6138' feet
4218 feet
Size
Plugs (measured)
Junk (measured)
Cemented Measured depth True vertical depth
true vertical
Tubing (size, grade, and measured depth) 2-7/8", L-80 tubing w/Centrilifl PC ESP assembly to 5480' MD
Packers and SSSV (type and measured depth)
"A WD" packer @ 5846' MD
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Gravel pack screen assembly w/Otis Versa-trieve packer @ 5517" MD & Otis
R _CF. iV rcD
APR - 4 1995
ijil & Gas Cons. C0mmissiot~
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
15. Attachments
Copies of Logs and Surveys run __
Daily Report of WeJJ Operations x
17. I hereby ce~i~ t.~~mmmm~r~,,.~g~and correct
Signed
Form 10-404 Rev/36/15/88
16. Status of well classification as:
Oil x Gas Suspended
to the best of my knowledge.
Title Drilling) Engineer Supervisor
Service
SUBMIT IN DUPLICATE
BP/AAI SHARED SERVICE
DAILY OPERATIOk, ~
PAGE: 1
WELL: MPU 1-02
BOROUGH: NORTH SLOPE
UNIT: UNKNOWN
FIELD: UNKNOWN
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 03/04/95 08:00
SPUD:
RELEASE: 03/08/95 06:00
OPERATION: DRLG RIG:
WO/C RIG: NABORS 4ES
03/05/95 ( 1)
TD: 6260
PB: 6139
NIPPLE UP BOPS MW: 0.0
MOVE RIG FROM J-03 TO 1-02 AND SPOT OVER WELL. BERM AND
TRIM HERC. PULL BPV SET AND HOOK LINES TO THRASH TANK AND
TEST. LINES. PUMP 8.4 PPG HEATED SOURCE WATER DOWN TBG
TAKING RETURNS TO THRASH TANK. CIRC. ND ADAPTER FLG AND
TREE. NIPPLE UP BOPS. ACCEPTED RIG @ 2000 HRS ON 03/04/95.
03/06/95 (2)
TD: 6260
PB: 6139
RUNNING GR/JB W/ CAMCO MW: 0.0
NIPPLE UP BOPS. TEST BOPS. RIG UP LUBRICATOR FOR OFFSET
HGRS AND PULL TWC. M/U LANDING JT IN HGR BOLDS AND PULL
HGR TO FLOOR, TEST ESP CABLE W/ SYSTEMS REP AND LAY DOWN 1
- GLM AND 93 JTS 2 7/8" RICE WRAPPED TBG. FOUND ARC DAMAGE
TO COLLARS ON JTS. CONTINUE TO PULL TBG STRAP AND DRIFT.
STAND BACK 14'STDS. CHANGE OUT 9 COLLARS. LAY DOWN 33 JTS
AND HAD 25 GALLED JTS. INSPECT AND LAY DOWN ESP. RIG
CAMCO TO RUN GR/JB AND TAG TD.
03/07/95 (3)
TD: 6260
PB: 6139
RIH W/ ESP COMP MW: 0.0
CONTINUE RIG CAMCO AND RUN #1 GR/JB TO 5517'. POH AND RIG
DOWN CAMCO UNIT. RIG UP ON 7" X 9 5/8" ANNULUS AND TEST
WITH DIESEL, OK. CLOSE OFF AND REPLACE FLGS. P/U PCP AND
INSP AND RIH W/ SAME PICKING UP TBG FROM SHED. CUT DRLG
LINE. CONTINUE TO RIH W/ COMPLETION. RIG UP TO RUN
RAYCHEM HEAT TRACE TAPE. CONTINUE TO 'RIH W/ ESP COMP
INSTALLING HEAT TRACE TAPE AND FLAT BANDING.
03/08/95 (4)
TD: 6260
PB: 6139
RELEASE RIG. TREE SECURE. MW: 0.0
CONT TO RIH WITH PCP ESP COMPLETION INSTALLING HEAT TRACE
TAPE.SPACE OUT FOR HGR. & HEAT TRACE. MAKE SPLICE IN ESP
CABLE TO HGR. LAND HGR. IN TBG. SPOOL & TEST TO 50000 PSI.
SET TWC. ND. BOP'S & ADAPTER. N/U ADAPTER FLG & TREE TEST
TREE TO 500 PSI. REPLACE LOCK DOWN PIN GLAND NUTS ON TBG
SPOOL & TEST ADPT FLG. TO 5000 PSI & PULL TWC. FREEZE
PROTECT W/85 BBL DRY CRUDE DOWN ANNULUS & 12 BBL MECH. IN
TBG SET BPV. SECURE TREE & CLEAN PIT. RIG RELEASED AT
0600 HRS 3/8/95.
SIGNATURE:
DATE:
Gas Cons. Commission
Anchor;
, .~noco Inc.
Anchorage Division
To Larry Grant
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
(907) 279-1433
[] Under Separate Cover
Enclosed
,cord of Shipment of
Confidential Information
Date
From Steve Davies
Conoco Inc.
3201 C Street, Suite 200
June 10, 1993
Anchorage, Alaska 99503
(907) 564-7640
Via Petroleum Couriers
Subject
Quantity Contents
Core Analysis Report
Sidewall Descriptions
~01~? .~.-2 Final Drilling Report
C~1.-_~_,~ ,'~1-3 Final Drilling Report
¢~)1~'1 ~!-4 Final Drilling Report
(~-,~!-1 Final Drilling Report
¢~1~ ! ~-2 Final Drilling Report
C~~ ~1-3 Final Drilling Report
-3 No Whole Core or Sidewall Cores taken as noted on completion report.
~l~J I-4 Final Drilling Report
1 t-4A Core Analysis Report
1 ; U-1 Final Drilling Report
c~1~I d-1 Core Analysis Report
1 ~-1 Core Description Report
~11.~~ ~ ~-2 Final Drilling Report
'~-2 Completion History
¢~)1~'7-. 'Jo'-3 Final Drilling Report
O~:~l~~J~-4 Final Drilling Report
~.~ ~ Final Drilling & Completion Report
~:~)~--//E~--:8 Final Drilling & Completion Report
9 Final Drilling & Completion Report
C~ f jO/.~_9 C°re Descripti°n Rep°rt - Core Analysis Report
RECEIVED
& Gas Cons. Commission
Anchorage
¢ Signed By
Date
Transmittal Approved By -'.
Instructions: Please rmng second copy.
Received By Date
Remarks
"~June lb;-1-E~3
Transmittal Copy Only To
(Jonoco Inc.
Anchorage Division
hecord of Shipment of
Confidential Information
To Larry Grant
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
{907) 279-1433
[] Under Separate Cover
Enclosed
Date
From Steve Davies
Conoco Inc.
MO¥ 5. 1993
3201 C Street~ Suite 200
Anchorage, Alaska 99503
(907) 564-7640
Via Petroleum Couriers
,Subject
Milne Point Well Log Magnetic Tapes I-2, I-3, I-4~ I-4A~ J-l~ J-3~ J-4~ L-7~ L-8~ L-9
Quantity
Contents
1 each
I-2 Magnetic Tape. ~EDIT; APl #50-029-22066, Log Date: 03-NOV-90, Ref #74175. :::~:...~-,~,i,
I-3 Magnetic Tape. O.H.EDIT, APl #50-029-22067, Log Date: 12-NOV-90, Ref #74203. g~O-c~
I-4 Magnetic Tape. O.H.EDIT, APl #50-029-22068, Log Date: 19-Nov-90, Ref #74208. ~l~~
I-4~Magnetic Tape. O.H.EDIT, APl #50-029-22068, Log Date: 29-Nov-90, Ref #74229.
J-1 Magnetic Tape. Open Hole,APl #50-029-22070, Log Date: .13-Dec-90, Atlas Wireline & LIS listing,c~O-~'~'
J-3 Magnetic Tape. O.H.EDIT, APl #50-029-22072, Log Date: 27-Dec-91, Ref #74271 & LIS listing.
J-4 Magnetic Tape. O.H.EDIT, APl #50-029-22073, Log Date: 03-Jan-91, Ref #74276 & LIS Iisting. c~~
L-7 Magnetic Tape. O.H.EDIT, APl #50-029-22028, Log Date: 14-Feb-91, Ref #74350. ~
L-8 Magnetic Tape. Open Hole,APl #50-029-22074, Log Date: 17-Apr-91, Ref #74527 & LIS Iisting.~o~ll3D
L-9 Magnetic Tape. O.H.EDIT, APl #50-029-22075, Log Date: 28-Mar-91, Ref #74467. ¢[O
RECEIVED
M~Y 0 5
~iaska 0il & Gas Cons. C0mmlssi0n
Anchorage
**LIS listings not availabe for I-2, I-3, I-4, I-4A, L-7 & L-9. Verbal notification provided to H. Oakland. Waiver
granted via phone conversation May 5, 1993.
{~~~ Signed By
Transmittal Approved By ~ Date
Instructions: Please ackno~'~ge~°mptly by signing and returning second copy.
Received By Date
May 5, 1993
Remarks
Transmittal Copy Only To
STATE OF ALASKA
ALA~ OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well
Alter casing Repair well __ Plugging __ Time extention Stimulate.
Change approved program Pull tubing ..X Variance __ Perforate __ Other
Name of Operator
Conoco Inc.
Address
3201 C Street, Suite 200 Anchorage, AK 99503
Location of well at surface
2948' FNL, 3756' FEL, Sec. 33, T13N, R10E, U.M.
At top of productive interval
1568' FNL, 492' FEL, Sec. 33, T13N, R10E, U.M.
At e~fective depth
1526' FNL, 233' FEL, Sec. 33, T13N, R10E, U.M.
At total depth
1510' FNL, 129' FEL, Sec. 33, T13N, R10E, U.M.
.5. Type of Well:
Development X
Exploratory __
Stratigraphic __
Service
NSB AK
NSB AK
NSB AK
6. Datum elevation (DF or KB)
KB 7O MSL
7. Unit or Property name
Milne Point Unit
8. Well number
I-2
9. Permit number
90-91
10. APl number
5O-029-22066
11. Field/Pool
NSB AK
feet
Kuparuk River/Schrader Bluff
12.
Present well condition summary
Total depth: measured
true vertical
6260' feet
4309' feet
Plugs (measured)
Effective depth: measured 6138 feet
true vertical 4218 feet
Junk (measured)
Casing Length Size
Structural
Conductor 71' 13-3/8"
Surface 2765' 9-5/8"
Intermediate
Production 6186' 7"
Uner
Perforation Depth:
Cemented Measured depth True vertical depth
Surface 106' 106'
Surface 2800' 2384'
T.O.C.@~ 4000' 6221' 4280'
measured 5710'-5722', 5742'-5758', 5775'-5782', 5803'-5826', 5898'-5940', 5982'-6018'
true vertica13895'-39o4', 3920'-3932', 3945'-3950', 3966'-3983', 4038'-4069', 4101'-4128'
Tubing (size, grade, and measured depth)2-7/8", 6.5#, L-80, 8rd, EuE, 5482' MD R ErE ~VED
Packers and SSSV (type and measured depth) None
MAR - 6 ~ag~.
Alaska 0ii & Gas Cons, Coral
13. Attachments
Description summary of proposal X Detailed operations program __ BOP sketch Arlch01'a~
14. Estimated date for commencing operation
April 1, 1992
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas Suspended__
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~,,,~~/~".~-~B. G. Augustine Title Sr. Production Engineer
! FOR COMMISSION USE ONLY
Date 3/5/92
Conditions of approval: Notihj Commission so representative may witness
Plug integrity __ BOP Test Location clearance
Mechanical Integrity Test Su---'bsequent form required 10-'"'
Approved by order of the Commission
ORIGINAL SIGNED BY'
LONNIE C, SMITH
Approval No.
Commissioner Date ,-.~- ~- (~ ~
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
tissiO~
MILNE POINT UNIT I-Z
IEPLACE INOPEI~TIVE E-SUB
SU~Y PROCEDURE
1. MIRU slickline unit and pull dummy valve from gas lift mandrel at 5294'.
RDMO slickline unit.
2. MIRU workover rig.
3. Kill well with 8.6 ppg NaCl. ND production tree. NU BOPE and test.
4. POOH with tubing to E-Sub (approximately 20').
tubing.
LD E-Sub and 1 joint of
5. POOH with 3000' of coated tubing and LD.
6. RIH with 3000' of coated tubing, replacing seal rings.
7. Replace E-sub.
8. RIH with tubing. Land hanger and pressure test.
9. ND BOPE and NU production tree. Pressure test tree. RDMO rig.
10. MIRU slickline unit. RIH and set dummy valve in gas lift mandrel at 5294'.
RDMO slickline unit.
11. Return well to production.
RECEJVJSD
Alaska Oil & Gas Cons.
Anchorage
AL.~KA OIL. AND ~AS CONSERVATION COMMI~o~ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations pedormed:
Operation shutdown __ Stimulate __ Plugging
Pull tubing ~ Alter casing __ Repair well X
Pedorate __
Other
2. Name of Operator
CONOCO TNC.
3. Address
3201 C St.,Ste.,200 Anchorage, AK 99503
4. Location of well at surface
2948' FNL, 3756' FEL, Sec. 33,
At top of productive interval
1568' FNL, 486' FEL, Sec. 33,
At effective depth
5. Type of Well:
Development X__
Exploratory __
Stratigraphic __
Service __
T13N, R10E, U.M.
T13N, RiOE, U.M.
Attotaldepth
1510' FNL, 129' FEL, Sec. 33, T13N, RiOE, U.M.
6. Datum elevation(DForKB)
70 KB
feet
7. Unit or Property name
Milne Point Unit
8. Well number
I-2
9. Permit number/approval number
90-91 / ~/-- 2g~-
10. APl number
50--029-22066
11. Field/Pool Kuparuk River/
Schrader Bluff
12. Present well cOndition summary
Total depth: measured
true vertical
Effective depth' measured
true vertical
6260 feet
4308 feet
6138 feet
4293 feet
Plugs (measured) None
None
Junk (measured) None
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
Cemented
71' 13-3/8" 500 sxs. PermaFC
2765' 9-5/8" 938 sxs. PermaFE
6186' 7" 391 sxs. G
measured 5710'-5722'
5775'-5782'
truevertical 3895'-3904'
3945'-3950'
Tubing (size, grade, and measured depth) 2-7/8",
Packers and SSSV (type and measured depth) None
Measured depth
True vertical depth
106' 106'
2800' 2384'
6221' 4280'
5803'-5826'
5898'-5940'
3966'-3983'
4038'-4069'
6.5#, L-80 EuE
5982'-6018'
4101'-4128'
RECEIVED
5482 ' MD
FEB 1 992
,Alaska Oil & Gas Cons. CommissiOn
/~nchora_~e
13. Stimulation or cement squeeze summary
Intervals treated (measured) N/A
N/A
Treatment description including volumes used and final pressure N/A
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 15 0 6 0 10
250 250
Subsequent to operation Well down for final surface hook-up & check-out
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations __X
16. Status of well classification as:
Oil ~ Gas __ Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed/~/Z¢9¢ L.~",~_J~,~-.-,.~'~ Title
Form 1~)-404 Rev 06/15/88
Date
SUBMIT IN DUPLICATE
02-18-91: RIH w/ GR/TDT, log gravel; good pack indicated up to 5662' (top
of screens 5698'), GR indicates all lobes taking gravel. R/D
Schlumberger. P/U Reda pump assby. RIH w/ pump. Checked pump
& cable @ 25 stands - only showing 250 ohms to ground. PSI not
indicating pressure. POOH. Found PSI not working; changeout
same. RIH checking cable every 10 stands.
02-19-91: Finish RIH w/ 171 jnts of 2-7/8" tbg, & ESP cable. Splice ESP
cable to lower pig tail. Land tbg hgr & screw in lockdowns;
tested hanger body seals to 5000 psi. N/D BOP; N/U tree; test
to 5000 psi. Pull 2-way check. Pump 60 bbls of diesel into 7"
x 2-7/8" annulus. Install BPV & pump 12 bbls diesel into tbg.
Operations suspended pending well test. Rig released @ 2400
hrs 02-18-91.
Milne Point I No. 2 - WORKOVER
API No.: 50-029-22066
t,ocation:
AFE Number:
AFE Amount:
Milne Point Field - SCHRADER BLUFF POOL
10-61-1436 Approved: 09/18/91
$400,000 gross Cost to Date: $ 261,080 gross
1~/15/91: Move Rig over to I-2 Well.
(unload brine).
RU & Hook-up lines & equipment
12/16/91: Continue to rig up lines, etc. Had problems with circulating
& offloading - lines were froze up. Off load 400 BBLS of 8.6
NACL with 12% methanol in brine tanks (raise derrick - vac out
slop tank). Heat NACL brine to 150° with hot oil truck. Pull
BPV out of tubing hanger. Fill boilers with potable water.
Work on spooling unit generator. RU to pump NACL 8.6 ppg brine
down annulus & return through tubing. Check locks on MC & Reda
drive in ESP building. Pump brine at 150° @ 2.75 BBL/min rate.
Pumped 240 BBLS reverse circulating - Pump press 300 PSI.
Tubing press 150. SD pump - well is dead. 0 PSI TBG & 0 PSI
casing. Returns looked clean. Set BPV in TBG hanger. Nipple
down tree. Nipple up BOP's. Complete BOP inspection; test
press 2500 PSI using diesel. Vac out slop tank. 240 BBLS
crude & diesel. RU & run 2-way check. Sting into hanger and
lift to rig floor. Breakout hanger & penetrator after
resistance checks on both cable & penetrator. Found bad spots
in cable at 90' 150' 160' 175' & 214' 4 stands in derrick.
12/17/91: Cut bad spots out of cable in several spots. Called
electricians out to work on spooling unit generator. Restored
power to unit. Continue out the hole with ESP assembly. Found
one more bad spot in cable @ 915' (29th stand). Reach top of
pump. Take resistance readings. Remove flatguards and flat
cable. Take oil samples. Everything looks good except for top
seal section with oil contamination. Motor looks like it may
have a flat spot where possibly rubbing and/or overheating.
Top of pump looks like (discharge) paint peeled off due to
overheating. Pump turns freely & motor turns but with some
resistance due to possible flat spot on housing. Disassembled
ESP and lay down; Break out 7 bad joints of TBG. PU Otis APR-
M2 circulating valve & seal assembly in order to sting into the
Otis "VST" packer. Packer is set at 5520' KBM (change out).
RIH with 2-7/8" EUE 6.5#/ft. TBG (175 JTS) Otis seal unit, and
APR-M2 cir. valve to 5520'. Pick-up 5' and circulate tubing
volume. RU slickline unit w/1.5" bailer. RIH & tagged fill at
6063 ' WLM, 45 ' below bottom perf in "O" sands. POOH
w/slickline. Found small amount of formation sand. Set up
pits to pump wellbore clean out treatment - wait on source H~O.
Pressure up annulus to 1400 PSI. Shifted APR-M2 circulating
valve. Mix pills of 50 BBL dirt magnet & 25 BBL HEC. Pump down
TBG.
~2/18/91: Pumped a total of 290 BBLS of NACL 8.6 PPG down TBG and up
annulus. Pumped 6 BBLS of super pickle with 26 BBLS of source
water to spot accross APR-M2 cir. valve. Pumped 42 BBLS to
clean up. Returns looked good. POOH with 2-7/8" EUE 6.5#/ft.
tubing, circ. valve, seal assembly. Lay down 98 JTS of TBG.
Leave 2400' or 76 JTS of 2-7/8" EUE in derrick. Move tubing
from pipe shed. PU centrilift pump assembly. Pull empty spool
from spooling unit & re-spot spooling unit. Move ESP equipment
into pipe shed. Move 60 JTS 2-7/8" 8rd rice wrap pipe into
pipe shed. Wait on Reda to lay down old ESP equipment. Make
up ESP equipment. Wait on centrilift hand to make splice on
cable & run ESP equipment.
12/19/91: Waiting on Centrilift hand to make splice on ESP cable. RIH
with ESP pump, 4' PUP JT two JTS 2-7/8" EUE 8rd TUB, check
valve, two JTS 2-7/8" EUE 8rd TUB 2' PUP JT 2-7/8" x 1-1/2"
MMG-P gas lift mandrel, 4' PUP JT & 72 JTS of 2-7/8" EUE 8rd
TUB. Pick up & install contactor. RIH with 82 JTS of 2-7/8"
EUE 8rd rice wrap TUB. Ran out of ESP cable with 400' ~ to go.
Bring in new spool of ESP cable & start making splice. Shut
down rig.
12/20/91: Completed making splice on ESP cable at 350' from surface.
Continue to RIH. Make up 2-7/8" 8rd EUE crossover sub, PTE E-
sub 2' x 2-7/8" EUE 8rd PUP, 2-7/8" x 1" EUE 8rd KBMG-M gas
lift mandrel, 3' x 2-7/8" EUE 8rd PUP & tubing hanger. Splice
ESP cable to pig tail & hook to tubing hanger. Run continuity
test on ESP cable & pig tail. Make up PTI power cable. Land
hanger & fish PTI cable out of casing valve. ND BOP's & NU
production tree. Test tree to 5000 PSI & hanger to 1000 PSI
(ok). Start ~etting rig ready to move. Could not rig down
because of -48 weather. Clean mud pits.
12/21/91: Rig down Ewe & support equipment. Wait on trucks to move rig
if weather permits. Temperature -45°. Fix and repair rig, also
start clean up of rig & location. Rig up HB&R to freeze
protect well. Pressure test lines two 2000 PSI. Start pumping
@ 1.5 BBLS/min @ 1000 PSI down tubing. Tubing displacement 30
BBLS. Displacement from GLM to perforations 12 BBLS. Pump
total of 42 BBLS. Shut down for 10 minutes to let diesel
migrate up back side. Continue this process until we pumped a
total of 105 BBLS of diesel. Final press 750 PSI @ 1/4
BBL/min. Rig down HB&R & secure well. RECEIVED
Alaska Oil & ~a$ Cons. CommissiO~
Anchorage
12/22/91: Wait on trucks to move rig, weather permitting. Temperature is
-50o. Can not use crane to move well house off G-7 to. Max
operating range for crane is -35° per manufacturer. Continue
to clean up rig & make repairs. Trucks to move rig came
available. Moved well house off G-7 by cutting door support
beam & skidding well house off with two loaders, re-weld.
Support beam on well house good as new. Level pad, start
moving ri~. Will not raise mast on rig until temperature gets
above -35 . We lowered mast on I-2 when temp was -34°.
FEB 1,~ 1992
Alaska Oil & Gas Cons. Commission
AnChorage.
STATE OF ALASKA
ALA~r~A OIL AND GAS CONSERVATION COMMIbolON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend __
Alter casing __ Repair well
Change approved program __
Operation shutdown Re-enter suspended well
Plugging __ Time extention Stimulate
Pull tubing X Variance __ Perforate __ Other
Name of Operator 5. Type of Well: 6.
Conoco Inc. Development X
Address Exploratory. 7.
3201 C Street, Suite 200 Anchorage, AK 99503 Stratigraphic
Service
Location of well at surface 8.
2948' FNL, 3756' FEL, Sec. 33, T13N, R10E, U.M.
At top of productive interval
1568' FNL, 486' FEL, Sec. 33, T13N, R10E, U.M.
At effective depth
At total depth
1510' FNL, 129' FEL, Sec. 33, T13N, R10E, U.M.
Datum elevation (DF or KB)
70 KB
unit or Property name
Milne Point Unit
Well number
I-2
9. Permit number
90-91
10. APl number
50-029-22066
11. Field/Pool
feet
Kuparuk River/Schrader Bluff
12. Present well condition summary
-Total depth: measured 6260 feet Plugs (measured) None
true vertical 4308 feet Junk (measured) None
E/fective depth: measured 6138 feet Junk (measured) None
true vertical 4293 feet
Casing Length Size Cemented
Structural
Conductor 71' 13-3/8" 500 SXS. PermaF C
surface 2765' 9-5/8" 938 sxs PermaF E
Intermediate 254 SXS. E
Production 6186' 7" 391 SXS. G
Liner
Perforation Depth: measured 5710'-5722' 5803'-5826' 5982-6018'
5775'-5782' 5898'-5940'
true vertical 3895'-3904' 3966-3983' 4101 '-4128'
3945'-3950' 4038'-4069'
Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 EuE 5476' MD
Measured depth
106'
2800'
6221'
Packers and $SSV (type and measured depth) None
True ve~cal depth
106'
2384'
4280'
13. Attachments
Description summary of proposal . .X
Detailed operations program
BOP sketch
14. Estimated date for commencing operation
10/01/91
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas
Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed . Au~lustine Title Sr. Production Engineer
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Approval No.
Plug integrity BOP Test
Mechanical Integrity Test ~
Location clearance
.....
Subsequent form required 10- ~ ~
Approved by order of the Commission
ORIGINAL SIGNED BY
LONNIE C. SMITH
Commissioner
Approved Copy
Returned
Date c1. ~1
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
H~LNE POINT UNiT ~-~ .... .
OUT F~LL AlqD RUN NEW L
SU~Y PROCEDURE
1. MIRU EWS #4 rig.
2. Kill well with 8.5 ppg NaCl. ND production tree. NU BOPE and test.
3. POOH with tubing, ESP, and ESP cable. LD ESP and cable.
4. RU slickline unit and RIH with wireline tools. Tag fill.
5. POOH with wireline and RD unit.
6. RIH with seal assembly on 2-7/8" tubing and sting into gravel pack packer at
5520'. Pressure test annulus to 500 psi.
7. RU coiled tubing unit. RIH with coiled tubing and circulate out fill to
PBTD.
8. POOH with coiled tubing and RD coiled tubing unit.
9. POOH with 2-7/8" tubing and seal assembly.
10. PU new ESP, motor, and cable. RIH with ESP assembly and tubing. Set bottom
of pump at 5480'.
11. ND BOPE and NU production tree. RDMO rig.
12. Return well to production.
RECEIVED
STATE OF ALASKA
ALASKA i _AND GAS CONSERVATION CC ,AISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
OIL C~]
GAS C SUSPENDED i:'~, '"~ ABANDONED
2. Name of Operator
CONOCO INC.
3. Address
Pouch 340045, Prudhoe Bay, Alaska 99734
4. Location of well at surface
SERVICE LJ
i¢' t~', ,,,,,
2948'FNLx3756'FEL of Sec. 33, T13N R10E Umiat F[~ridi~n
At TOp Producing Interval
1568'FNLx486' FEL of Same Section
At Total Depth
~5~0'~Lx~29' ~DL o~ Same Sact$o~
5. Elevation in feet (indicate KB, DF, etc.)
70' KB
Lease Designation and Serial No.
ADL - 25906
12. Date Spudded
10-27-90
17. Total Depth (MD+TVD)
6260 + 4308
13. Date T.D. Reached
11-1-90
18.Plug Back Depth'iM~TVD)
6138 + 4293
22. Type Etectric or Other Logs Run
DITE, LDT, CNL, NGT, AMS
Classification of Service Well
7. Permit Number
90-91
8. APl Number
5o--029-22066
9. Unit or Lease Name
Milne Point Unit
10. Well Number
~-2
11. Field and Pool
KUPARUK RIVER FIELD
14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
~1 I N / A feet MSL , / ,~ IV
19. Directional Survey 20. Depth whereSSSV set I 21. Thickness of Permafrost
YES]i(] NO [] NONE feet MD I + 1800
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP
35
BOTTOM
106
28OO
HOLE SIZE
30
,,12-1/4
CASING SIZE
CEMENTING RECORD
500 sxs PermaFrostC
938 sxs PermaFrost E
254 sxs E
AMOUNT PULLED
NONE
NONE
WT. PER FT.
GRADE
13-3/8 54.5# K-55
36# J-55
35
9-5/8
7
24. Perforations open to Production (MD+TVD of Top and Bottom and
interval, size and number)
N Sand
5710-22 MD, 3903 TVD 12SPF, 24GM,5742-58,
5775-82
5803-26 MD, 3991TVD 12SPF, 24GM
0 Sand
5898-5940 MD, 4046 TVD, 5SPF, 37GM
5982-6018 MD, 4136 TVD, 5SPF, '37GM
26# L-80 35 6221 8-1/2 391 sxs G NONE
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
2--7/8 5476 NONE
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
5898-6018 82726# 16-20 Hesh
27. PRODUCTION TEST
Carbo Lite Proppant
I Method of Operation (Flowing, gas lift, etc.)
Submersible Pump- Well Unloaded and shut-in
DateNAof Test HoursNATested 1TESTPERIOD I~ IPRODUCTION FOR OIL-BBL IGASoMCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED , IOIL-BBL I GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~1~l
28. CORE DATA . '¢- ~.-. '~ "~ '~
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core ch,ps,~, '~.iti~ ~ , ~¢~.. ~
Date First Production
3-3-91
NONE TAKEN
Form 1 O-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
29. 30.
NAME
Top of "N" Sand
Top of "0" Sandi
GEOLOGIC MARKERS
MEAS. DEPTH
5710'
5898'
TRUE VERT. DEPTH
3903'
4046'
r ,~RMATION TESTS
Include interval tested, pressure data, alt fluids recovered and gravity,
GOR, and time of each phase.
NA
31. LIST OF ATTACHMENTS
Plat, Gyro Survey
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
S igned~._ _~?_~/~_(~_~/.~,,~ Title Sr. Prod. Foreman
Date 4-28-91
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none"
Form 10-407
NOTES:
I. STATI~ PLANE[ COORDINATES ARE ZONE 4,
2, ALL GEODETiC POSITIONS AF~E BASED ON
N.A-D. 1927,
OFFSE:'PS TO SECTION LINES ARE COMPUTED
BASED ON Pt~OTEACT~D VALUES OF THf[
SECTION CORNER POSITIONS,
I PAD PROPOSED
, ----_ _ EXPANSI ON
I ~--:~I--~I-5 I-'6 I-7 ,28 ' ~I
! I ~SSERVS P~T i ! ~'l
~IILN[ POINT UNIT ~
...--'-"~- I PAD
! \, ~ gAY
MtLNE PT. VICINITY MAP
MILES
LEGEND
I EXISTING WELL
0 PROPOSED WELL
PI j I-3.. $ 87'25'19" E
Y 6,009,284,486 410,00'
X 551,787,589
AS-BUILT
WELL DATA
PLANT
COORD$
LOCATED WITHIN SECTION 3,3
T. 13 N., R. 10 E., U.M., ALASKA
I--1 N 1120.60 Y 6,009,445.29 70' 26' 11.58¢' 2951" FNL
E 1580.~6 X S51o6?S.16 1~9' ~4° 4~.261" 5696' FEL
i
I-2 N 1120.47 Y 6,009,447.85 70' 26° 11.614" 29~8' FNL
E 1320.51 X 551,615.27 1~9' 34' 45.019' 3756" FEL
!-3 Nl120.1¢ Y 6,009,450.22 70' 26' 11.6¢I" 2945' FNL
E 1260.~1 X 551,5§5.2~ 149' ~4.' 46.780' 3816' FEL
,,i,
1-4 N 1119.98 Y 6,009,4,52.80 70' 26° 11.670" 2942' FNL
E 1199.66 X 551,~9~.5~ 1~9" 34' ~8.§61" 5876' FEL
, ~
II I .....
SURVEYOR'S
CERTIFICATE
1 HEREBY CERTIFY THAT I AM PROPERLY REGISTEREr3
AND LICENSED, TO PRACTICE LAND SURVEYING IN THE
STATE OF' ALASKA, AND THAT THIS PLAT REPRESENTS
A LOCATiON SURVEY MADE BY ME OR UNDER MY DIR-
ECT SUPERVISION,AND THAT ALL DIMENSIONS AND
OTHER DETAILS ARE CORRECT,
=~:0 ~-VEyED FOR: ._
cconoco)
DATE: 3-27-91 - "-
DRAWN: STOLL 0
c. Ec~E~:,6..:.o WELL CONDUCT R AS-BUILTS
~o. No.: ~oos~ I-1 I-2, I-,3 & I--
SCALE: 1" - 300' t
Milne Point I No. 2
COMPLETION HISTORY
Kuparuk River - SBP - North Slope Borough, Alaska W.I. 1.0
Milne Point I No. 2 (P) CONFIDENTIAL AFE 10-61-1256
Location: 2948' FNL, 3756' FEL, Sec. 33, T13N, R10E, U.M. NSB AK
Location: Bottom hole, 1456' FNL, 159' FEL, Sec. 33, T13N, R10E
Objective: 6110' MD- Schrader Bluff
01-29-91: Rig accepted 0000 hrs 01-29-91. N/D tree, N/U BOP. Test BOP.
P/U bit/scraper/4DC. RIH, P/U drill pipe. Tagged bottom @
6154. Mix & reverse 20 bbls H20 w/ 27 gal of dirt magnet.
Mud wt. 8.6 Viscosity: N/A Cum. Cost: $ 1,009,617
POOL 102 (0-9-1) Drillinq Foreman: BRADY
01-30-91: Reverse circulate @ 6 bpm to displace 9.2 ppg brine w/ 8.6
ppg. Filter to 2 microns & complete a full circulation.
POOH. WOW. R/U Schlumberger, GCT. RIH to 6100' & log up.
Clean snow f/ perf guns & attempt to establish continuity - no
success. Roads impassable, cannot get more tools. Rest
Schlumberger personnel.
Mud wt. 8.6 Viscosity: N/A Cum. Cost: $ 1,037,521
POOL 102 (0-9-2) Drillinq Foreman: BRADY
01-31-91: WOW. Schlumberger unit inoperative - needs replacement parts.
R/D Schlumberger. RIH to 1200, circulate to prevent freezing.
WOW.
Mud wt. 8.6 Viscosity: N/A Cum. Cost: $ 1,058,524
POOL 102 (0-9-3) Drillinq Foreman: BRADY
02/01/91: WOW. POOH, R/U Schlumberger. WOW - road open to MPU & to
spine. P/U guns, RIH, tie in w/ open hole GR, shoot 5 SPF,
5 lb, 37 gm shots f/ 6002' - 6018'. P/U next gun w/ CCL. RIH
tie-in w/ CCL & perf f/ 5982' - 6002'. POOH w/ gun. RIH w/
gun & tie-in w/ CCL. Perforate from 5918-38' & 5938-40'.
POOH w/ gun. RIH w/ gun & tie-in w/ CCL. Perforate from
5898' - 5918'. POOH w/ gun. R/D Schlumberger. P/U 3 jts DP,
Champ PKR, Jars & RIH.
02/02/91: RIH w/ Champ PKR to 5698' R/U Dowell Schlumberger. Set PKR
@ 5698'. Pressure test blckside to 500 psi. Continue to R/U
DS. Prep pumps, engines, turbines for frac job. Pressure
test lines to 7500 psi. OK. Pump 100 bbl pre-pad @ 25 bpm.
Shut down for 10 min. ISIP - 934 psi. Pump frac job as
follows: 340 bbls pad, 15 bbl 2 ppg prop, 32 bbl 4 ppg prop,
35 bbl 6 ppg prop, 50 bbl 8 ppg prop, 60 bbl 10 ppg prop, 70
bbl 12 ppg prop, 56 bbl 14 ppg prop (out of 75 bbls planned)
When the pressure immediately increased from ± 3900 psi to
6500 psi. Attempt to displace frac fluid w/ diesel. No
success. R/D DS lines on rig floor. R/U to reverse circ.
Open bypass ports on Champ PKR. Pressure up on annulus to
1000 psi. Could not reverse circ. 0 psi on DP. Wait on
post-fracture treatment as per completion procedure.
Milne Point I No. 2
Completion History
Page 2
02/03/91: Wait on post frac treatment as per completion procedure.
Unseat Champ PKR. POOH. Pipe pulled dry. No sand in DP.
P/U bailer assby & TIH. Assby: saw tooth collar, flapper
valve, 40 jts 3-1/2" DP, bailer, safety jt, 3-1/2" DP. Tagged
sand @ 5345'. Bailed for 1 hr - lost = 30' of hole. Sand
still settling out.
02/04/91: Note: Found 2 stand error in pipe talley. Depth sand
tagged - 5472' Top of perforations 5898' PBTD - 6148'
· , ·
Est. 676' sand (= 26 bbls sand). Attempt to bail sand. Lost
another 30' to approx 5410'. POOH w/ 4-7/8" bailer. Found
piece of hydril rubber lodged up against flapper valve.
Recovered = 1 bbl sand. Mandrel on bailer stuck in closed
position. Could not get open. P/U 2-7/8" bailer & RIH on
3-1/2" DP. Use 30 jts 3-1/2" DP for cavity. Tag sand
@ 5395'. Bail 10' to 5405'. Sand began falling in. Lost
± 60' hole to 5350'. Make 5 stand short trip. Tag sand
@ 5342'. POOH w/ 2-7/8" bailer. Recovered 3/4 bbl sand. L/D
bailer assby. Mandrel stuck in closed position also on 2-7/8"
bailer. (Suspect frac sand is causing this). P/U 6" bit w/o
jets & TIH to 3014'. Rev circ hole volume. Got back traces
of frac sand. Slip & cut drill line. RIH w/ bit to rev circ
on bottom.
02/05/91: TIH to 5312'_ccir Tagged sand. R/U to rev circulate. Reverse
full hole @ 100 stk/min. Attempt to wash down thru sand.
No success. P/U kelly. Rotate ± 30' thru sand, circulating
long way. L/D kelly· R/U to reverse circulate. Pump 15 bbl
Hi Vis pill. Circ 1 hole volume. Pill returns indicated very
little sand· Pump 10 bbl Hi Vis pill. Circ two complete hole
volumes. Est top of sand @ ± 5320'. POOH w/ bit. TIH w/ saw
tooth collar, flapper valve, 10 stds 3-1/2" DP. M/U 2-7/8"
bailer· Observed stem on bailer was twisted & bent near the
tool joint. Decision made not to run bailer until stem
inspected· L/D bailer· Send in to Tuboscope for inspection.
Had bailer Magna-fluxed, straightened out & Magna-fluxed
again. Tool check out OK. Send back to rig. P/U bailer
assby & TIH. [P/U 10 stds 3-1/2" DP for cavity - 4.2 bbls
capacity] Note: 4-7/8" bailer used in prior run is no longer
usable. Replacement is scheduled to arrive 2/8/91. Tag sand
@ 5324'. Bail sand f/ 5324' - 5371' (47').
02/06/91: Bail sand f/ 5371 - 5394'. Bailer quit stroking. POOH.
Retrieved 2.8 bbls of sand. P/U 2-7/8" bailer. TIH. Tag
sand @ 5393'. Bailer not stroking. Attempt for 1-1/2 hrs to
get bailer to work. No success. POOH w/ bailer. Prepare to
run Baker hydrostatic bailer. P/U notch collar/flapper valve,
48 jts 2-7/8" tbg, Baker master hydrostatic valve, 3-1/2" DP
& TIH. RIH w/ 3-1/2" DP dry. Tag sand @ 5403'. Bail f/
5403' -5598' (195'). POOH w/ bailer assby.
Milne Point I No. 2
Completion History
Page 3
02/07/91: POOH w/ bailer assby. No sand in tbg cavity. Flapper valves
(Baker has dual flappers in their sub) failed to hold sand.
Geolograph showed sudden loss in weight in a couple of spots.
R/D sand chute. P/U 2-7/8" flapper valve off bulldog bailer
& place 1 jt above Baker flapper sub for extra backup. TIH &
tag sand @ 5499'. Bail sand f/ 5499' - 5530'. Master
hydrostatic valve stopped functioning. Assby quit bailing.
Close hydril. Pressure up on annulus to 800 psi. Try to
unplug string. No success. POOH w/ bailer assby. Found
hydrostatic valve full of frac sand. Retrieved 1-1/2 bbls of
sand. P/U mule shoe jt, csg scraper. TIH to 2507'. Rev circ
2 hole volumes. Pump 15 bbl Hi Vis pill around. TIH to
4504'. Rev circ/pump Hi Vis pill. Recovered trace of sand.
TIH to TD. Tag @ 5509'. Pump 15 bbl Hi Vis pill. Reverse
circ 1-1/2 hole volumes. POOH to P/U hydrostatic bailer.
02/08/91: Finish POOH. P/U Baker notch collar/flapper valve, 1 jt
2-7/8" tbg, backup flapper valve, 47 jts 2-7/8" tbg, master
hydrostatic valve, 3-1/2" DP & TIH. Tag sand @ 5512'. Bail
f/ 5512' - 5528' Bailer quit bailing @ 5528'. POOH w/
bailer assby. C~uld find nothing wrong w/ assby. Appears
that something is on bottom preventing us from bailing.
(Possible rubber from annular). Change hydril rubbers.
Install new nitrile rubber. Old rubber very damaged. P/U 6"
bit, DC's & TIH (Due to weather, could not get any junk
baskets out).
02/09/91: Finish TIH. Tag bottom @ 5518'. Rotate on bottom w/
2000-4000 #'s weight w/o pumps. Attempt to break up any
rubber on bottom. R/U to reverse circ. Pump 15 bbl Hi Vis
pill. Circulate 3 complete hole volumes. Observed trace of
sand/ small pieces of rubber while circulating. P/U kelly &
rotate on bottom w/ 2000-4000 #'s weight on bottom w/o pumps.
Bit hung up once indicating something hard on bottom. R/U to
reverse circ Tag bottom @ 5520'. Pump 20 bbl Hi Vis pill.
Circ 2 complete hole volumes @ 5 bbl/min. Observed only trace
of sand/rubber @ surface. POOH w/ bit. Found 1 jet plugged
w/ rubber. P/U globe basket, DC's & RIH. Tag @ 5521'. Work
pipe w/o circulating. Made 1-1/2'. Reverse circ @ 5-6
bbl/min. Work pipe down to 5527' P/U kelly. Make a few
rotating runs on bottom. Reverse ~irc @ 6 bbl/min (2 bottoms
up). Worked to 5528'. Prepare to POOH for bulldog bailer.
02/10/91: POOH w/ 6" globe basket. No junk in basket. P/U bulldog
bailer assby & TIH. Tag sand @ 5528'. Bail sand f/
5528'-5728' (200'). POOH w/ bailer. Recovered 8 bbls sand
(19 stds). TIH w/ bulldog bailer. Tag sand @ 5723'. Bail f/
5723'-5874' (151').
Milne Point I No. 2
Completion History
Page 4
02/11/91: Bail f/ 5874'-5955'. POOH to 4-7/8" bulldog bailer. R/U to
dump sand. Found sand 1 stand below bailer. POOH & recover
9 bbls of sand. P/U bailer to service. Bailer came out of
hole stuck in open position (upstroke position). Send rod
section to Baker machine shop in Deadhorse for evaluation.
Rabbit & RIH w/ saw tOoth collar, flapper valve & 23 stds
3-1/2" DP. Found out from Baker that threads were not
repairable. Call out Baker 2-7/8" hydrostatic bailer. POOH
w/ 3-1/2" DP. M/U sawtooth collar, flapper valve (spring
loaded), 42 jts 2-7/8" tbg, Baker drain sub, 8 jts 2-7/8" tbg,
safety jt, Baker hydrostatic valve, 3-1/2" DP & TIH. Tag sand
@ 5956'. Bail f/ 5956'-6036' (80').
02/12/91: Bail f/ 6036'-6148 (PBTD). POOH w/ bailer assby. Recovered
15 stds sand (5.5 bbls) w/ traces of crude oil. M/U 6" bit,
11 jts 3-1/2" DP, csg scraper & TIH. Tag bottom @ 6064' (84'
off PBTD of 6148'). Tag @ 6055'. Lost 9'. P/U 1 std & go to
bottom. Tag @ 6052'. Lost 3'. P/U 1 std & go to bottom.
Tag @ 6052'. Circ 8' off bottom @ 1.2 bpm. Pump 90 bbls
clean fluid. RIH @ tag bottom @ 6051' (Lost 1'). Did not
lose any fluid while pumping. POOH above perfs to 5845'.
Clean filters on DE filter press. Circ/Filter fluid @ 5845'
Lost = 39 bbls while filtering fluid. RIH to bottom. Tag ~
6049'. POOH to pickup Baker hydrostatic bailer.
02/13/91: P/U hydrostatic assby & TIH. Tag sand @ 6051'. Bail f/
6051'-6148'. P/u & wait 15 min. GIH to bottom. No fill.
POOH to above perfs. RIH & tag sand @ 6065'. Lost 83'. Bail
sand f/ 6065'-6148'. Wait 15 min & re-tag bottom. No fill.
POOH w/ bailer. Recovered 3 bbls sand (78' in 7" csg). R/U
Schlumberger. RIH w/ junk basket & 6" gauge ring. Could not
get past 3893'. POOH. No junk in basket. RIH w/ same.
Could not get past 3948'. POOH. Found one small piece of DP
hardband in basket. Take off junk basket. RIH w/ 6" gauge
ring. Could not get past 3880' POOH & R/D Schlumberger.
Wait on boot baskets f/ Tri-State. M/U 6" bit, 3 boot
baskets, csg scraper, 5 DC's & TIH on 3-1/2" DP.
02/14/91: TIH to 3800'. Work pipe thru 3750'-3800'. Circ down to
3970'. TIH to 5890'. POOH. Found no junk in boot baskets.
R/U Schlumberger. RIH w/ GR, CCL, junk basket, 6" gauge ring,
2 weight bars to 5864'. OK. POOH. M/U sump PKR, GR-CCL.
RIH w/ sump PKR. Could not get past 4022' (Angle 69°). POOH.
P/U sump PKR, hydraulic setting tool, 2-7/8" PUP jt, XO, 1 std
3-1/2" DP, RA sub. TIH to 5856' on DP. R/U Schlumberger.
RIH w/ GR-CCL to correlate PKR setting depth.
Milne Point I No. 2
Completion History
Page 5
02/15/91: Correlate PKR setting depth w/ Schlumberger 1-1//16" GR-CCL
tool. POOH w/ wireline & R/D Schlumberger. Drop 1-7/8" ball.
Position PKR @ 5846'. Pressure up on ball to 2200 psi. P/U
pipe & set down 10,000 #'s on PKR to verify it set. Press up
to 3000 psi to blow ball into ball catcher sub. POOH w/
setting tool. R/U Schlumberger to perforate. Arm & load perf
guns (12 SPF, 24 gm). RIH w/ Run #1. Correlate guns w/
GR-CCL. Perforate "N" sand f/ 5803'-5826' (23'). POOH w/
guns. P/U guns for Run #2. Correlate w/ CCL. Perforate f/
5742'-5758' (12 SPF). POOH w/ guns. P/U guns for Run #3,
shoot f/ 5775'-5782', 5710'-5722'. POOH. P/U 3-1/2" OD gun
for dummy run, RIH to 5846' and run through sump PKR, no
obstructions noted. P/U Re-entry guide/XN nipple/pup/collet
guide/XO/Isolation sub/XO/T.T, screen/O-ring sub/2 jnts of
3-1/2", screen - handling sub backed out of screen, dropped
screen assby in hole. W.O.T. to fish screens.
02-16-91: W.O.T. P/U O.Shot/B-sub/Jars/DC. RIH tag fish @ 5758' - fish
had not fallen inside sump PKR. Work over fish. POOH w/
fish; retrieved entire assembly. L/D top screen; L/D jars/B-
sub. P/U gravel pack assby & washpipe. RIH w/ drillpipe.
Drop ball. Space out.
02-17-91: Set PKRw/ 1500 psi & pull test to 10,000 lbs over string wt.
Pressure to 2800 psi. P/U & shear out of release. Pressure
to 4000 psi - shear out ball seat. Locate reverse position,
pump 30 bbl high visc sweep down drill pipe & back to surface.
Pump pickle solution. Establish rates in squeeze mode 0.9 bpm
- 35 psi, 5 bpm - 1420 psi. Pump in squeeze mode @ 8 bpm -
2020 psi. Establish circulating rates 5 bpm = 500 psi.
Gravel pack well. Test pack to 2000 psi. OK. R/D Howco,
POOH L/D drillpipe. R/U Schlumberger.
02-18-91: RIH w/ GR/TDT, log gravel; good pack indicated up to 5662'
(top of screens 5698'), GR indicates all lobes taking gravel.
R/D Schlumberger. P/U Reda pump assby. RIHw/ pump. Checked
pump & cable @ 25 stands - only showing 250 ohms to ground.
PSI not indicating pressure. POOH. Found PSI not working;
changeout same. RIH checking cable every 10 stands.
02-19-91: Finish RIH w/ 171 jnts of 2-7/8" tbg, & ESP cable. Splice ESP
cable to lower pig tail. Land tbg hgr & screw in lockdowns;
tested hanger body seals to 5000 psi. N/D BOP; N/U tree; test
to 5000 psi. Pull 2-way check. Pump 60 bbls of diesel into
7" x 2-7/8" annulus. Install BPV & pump 12 bbls diesel into
tbg. Operations suspended pending well test. Rig released @
2400 hrs 02-18-91.
OPERATOR: CONOCO
MILNE POINT UNIT
I-2
FINAL DRILLING REPORT
WELL: MPU I-2
CASING: 13-3/8" @ 105'
FIELD: Milne Poin~i'a&Ep., ,.'.Y / 7 ,/99~TD: 6,110'
" u// &. .
9-5/8" e 2800 7",~~s
·
CURRENT TD: 6260
PR~'RESS: 0
DATE:
10-28-90:
10-29-90:
10-30-90:
10-31-90:
11-01-90:
11-02-90:
11-03-90:
11-04-90:
11-05-90:
11-06-90:
Description of Operations:
Move rig from I-1 to I-2 conductor. PU rig @ 2230 hrs 10-27-90. PU BHA, mix spud
mud, function test diverter.
Drill 105 to 330. Replace hydraulic pump on rig floor. MWD failed. Trip for new MWD.
Drill to 1024.
Drill 1024 to 1083. Ream 992 to 1083. Drill to 1417. Short trip 10 stds. Drill to 2363.
Short trip 10 stds. Drill to 2485.
Drill 2485 to 2525. Ream 2363 to 2525. Drill to 2820. C & C. Short trip. C & C.
POOH. Run 4 arm caliper on E/L. Unable to get below 1614. RIH w/bit. C & C. POOH
to run csg.
Run 71 jts, 2753', 9 5/8", 36#, K-55, Butt csg. FS @ 2800' FC @ 2719'. Circ.
Cement w/329 BBL Artic cmt & 52 BBL G cmt. Disp cmt & bump plug. ND diverter.
Install speed head. NU BOP. Test BOP. MU 8 1/2" drilling assy.
RIH. Drillout HOS cmt collar @ 1009. RIH. Drill out cmt to 2718. Test csg to 1500 psi.
Drill FC & FS. Drill 2820 to 2830. Run leakoff test to 16.0 PPG EMW. Drill to 4444.
Trip for MWD & bit. RIH. Tight hole. Ream 3016 to 3394.
Ream 3394 to 4444. Drill 4444 to 5294. Short trip. Drill to 6260. C & C. Short trip.
C & C. RU E/L. Unable to get log below 3900'. RIH w/bit. C & C. POOH. RU E/L. Run
DITE-LDT-CNL-NGT-AMS f/6256 to 2800. RIH w/bit.
C & C. POOH. LD DP & BHA. RU & run 155 jts, 6180', 26#, L-80, Butt csg. FS @
6221. FC @ 6139. Circ. Cement w/391 sx (80 BBL) G cmt @ 15.8 PPG. DISP w/
214 BBL 9.2 PPG Brine & 20 BBL diesel. Bump plug. Test csg to 1500 psi. Install
packoff. Would not test. Change out packoff. Test OK. ND BOP. NU tree. Clean pits.
Finish cleaning mud pits. Released rig @ 0200 hrs 11-05-90 to I-3. Operations
suspended.
RIG RECEIVED: 10-27-90
SPUD DATE: 10-28-90
RIG:Nabors 27-E DAYS: 9 / 9 FOREMAN: Mountjoy
~UB.~URFACE
DIRECTIONAL
~URVEY
ORIGINAL
I~UIDANCE
~]ONTINUOUS
~IOOL
Company
Well Name
CONOCO, INC.
MPU I-2 (2948' FNL, 3756' FEL, SEC 33, T13N, RIOE)
FleldlLocatlon SCHRADER BLUFF, NORTH SLOPE, ALASKA
Job Reference No.
74326
Loo(:ed 8¥:
BARNARD
SCHLUMBERGER
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE, ALASKA
SURVEY DATE: 29-JAN-91
ENGINEER: K.BARNARD
METHODS OF COMPUTATION
TOOL LOCATION:
INTERPOLATION:
VERTICAL SECTION:
TANGENTIAL-
LINEAR
HORIZ. DIST.
Aver&geO deviation and azimuth
PROJECTED ONTO A TARGET AZIMUTH
OF NORTH 67
DEG
58 MIN
EAST
COMPUTATION DATE: 5-FEB-91
PAGE
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE, ALASKA
DATE OF SURVEY: 29-JAN-91
KELLY BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.O0
100.00
200.00
300 00
400 00
500 00
600 O0
700 00
800 O0
900 00
0.00
99.95
199.95
299.95
399.95
499.94
599.80
699.43
798.71
897.32
-70. O0 0 0 N 0 0 E
29.95 0 4 N 83 43 W
129.95 0 0 5 50 54 W
229.95 0 7 N 44 26 W
329.95 0 6 N 68 48 E
429.94 1 9 N 68 54 E
529.80 4 14 N 65 18 E
629;43 5 44 N 65 3 E
728.71 8 1 N 65 37 E
827.32 1'1 9 N 63 11 E
0.00 0.00 0.00 N 0.00 E 0.00 N 0 0 E
-0.39 0.00 0.45 N 0.60 W 0.75 N 52 58 W
-0,46 0.00 0.46 N 0.68 W 0.82 N 55 59 W
-0,43 0,32 0.55 N 0.68 W 0.88 N 51 7 W
-0.44 0.28 0.54 N 0.70 W 0.88 N 52 17 W
0.09 3.53 0.84 N 0.25 W 0.88 N 16 25 W
5. 19 1.44 2.84 N 4.45 E 5.28 N 57 29 E
13.66 1.84 6.41 N 12.15 E 13.73 N 62 10 E
25.58 2.03 11.37 N 22.99 E 25.65 N 63 41 E
42.13 3.57 18.53 N 37.94 E 42.23 N 63 58 E
1000.00 994.66 924.66 14 47
1100.00 1091.17 1021.17 15 57
1200.00 1186.48 1116.48 19 23
1300.00 1279.23 1209.23 23 46
1400.00 1370.08 1300.08 25 2
1500.00 1459.63 1389.63 28 16
1600.00 1546.52 1476.52 31 27
1700.00 1630.43 1560.43 33 21
1800.00 1713.44 1643.44 33 55
1900.00 1796.20 1726.20 35 4
N 62 39 E 64.83 1.20
N 62 6 E 90.91 3.53
N 60 22 E 120.89 4.54
N 61 44 E 157.95 2.81
N 61 38 E 199.48 1.40
N 62 13 E 243.68 3.07
N 62 32 E 292.92 5.02
N 63 39 E 347.10 0.83
N 64 50 E 402.75 1.36
N 64 9 E 458,77 2.84
28.92 N 58.24 E 65.02 N 63 35 E
40.93 N 81.51 E 91.21 N 63 20 E
55.72 N 107.86 E 121.41 N 62 41 E
73.68 N 140.57 E 158.71 N 62 20 E
93.46 N 177.37 E 200.49 N 62 13 E
114.48 N 216.55 E 244.95 N 62 B E
137.37 N 260.41 E 294.42 N 62 11 E
162.12 N 308.84 E 348.80 N 62 18 E
186.23 N 359.11 E 404.53 N 62 35 E
210.43 N 409.75 E 460.63 N 62 49 E
2000.00 1875.69 1805.69 40 23 N 63 18 E 519.20
2100.00 1949.77 1879.77 43 26 N 63 32 E 586.14
2200.00 2020.40 1950.40 46 43 N 63 31 E 656.70
2300.00 2087.05 2017.05 49 38 N 63 20 E 731.02
2400.00 2149.80 2079.80 51 34 N 61 2 E 808.41
2500.00 2212.18 2142.18 51 16 N 61 36 E 886.04
2600.00 2273.68 2203.68 53 3 N 62 7 E 964.44
2700.00 2331.22 2261.22 57 24 N 62 30 E 1045o79
2800.00 2383.56 2313.56 58 38 N 63 3 E 1130.65
2900.00 2433.97 2363.97 62 6 N 65 24 E 1216.79
6.41
3.04
3.58
4.43
1.65
0.93
1.75
4.74
2.10
5,68
237.23 N 464.10 E 521.22 N 62 56 E
267.33 N 524.14 E 588.38 N 62 59 E
298.92 N 587.47 E 659.14 N 63 2 E
331.95 N 654.28 E 733.67 N 63 6 E
368.86 N 722.82 E 811.50 N 62 58 E
406.29 N 791,43 E 889.63 N 62 50 E
443.53 N 860.93 E 968.46 N 62 45 E
481.51 N 933.33 E 1050.22 N 62 43 E
520.53 N 1009.07 E 1135.42 N 62 43 E
558.08 N 1086,81 E 1221.72 N 62 49 E
3000.00 2477.36 2407.36 65 23
3100.00 2517.26 2447.26 66 38
3200.00 2557.70 2487.70 66 44
3300.00 2595.22 2525,22 68 22
3400.00 2633.77 2563,77 66 6
3500.00 2677.04 2607.04 63 2
3600.00 2720.34 2650.34 65 5
3700.00 2762.37 2692.37 65 39
3800.00 2800.40 2730.40 69 17
3900.00 2836.07 2766.07 69 3
N 66 21 E 1306,81
N 67 1 E 1398.47
N 65 32 E 1489.91
N 62 24 E 1582.31
N 63 26 E 1674.20
N 64 49 E 1764.13
N 65 45 E 1854.16
N 66 23 E 1944.84
N 64 34 E 2037.21
N 65 5 E 2130.49
3,73
2.89
5.17
2,35
4.54
2.58
O. 64
3.63
1.34
0.53
594.74 N 1169.08 E 1311.67 N 63 2 E
631.18 N 1253.22 E 1403.19 N 63 16 E
667.12 N 1337.32 E 1494.48 N 63 29 E
708.37 N 1420.31 E 1587.15 N 63 30 E
750.49 N 1502.39 E 1679.41 N 63 27 E
789.88 N 1583.46 E 1769.54 N 63 29 E
827.55 N 1665.34 E 1859.63 N 63 35 E
864.37 N 1748.27 E 1950.28 N 63 41 E
902.93 N 1832.31 E 2042.70 N 63 46 E
942.64 N 1916.87 E 2136.11 N 63 49 E
COMPUTATION DATE: 5-FEB-91
PAGE 2
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE. ALASKA
DATE OF SURVEY: 29-JAN-91
KELLY BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
4000 O0 2871.55 2801.55 69 29 N 65 23 E 2223.88
4100 O0 2906.49 2836.49 69 25 N 65 41 E 2317.49
4200 O0 2941.47 2871.47 69 24 N 65 59 E 2411.11
4300 O0 2979.02 2909.02 65 34 N 65 56 E 2503.71
4400 O0 3022.88 2952.88 62 13 N 66 5 E 2593.51
4500 O0 3072.50 3002.50 58 23 N 68 48 E 2680.28
4600 O0 3126.42 3056.42 56 5 N 72 5 E 2764.41
4700.00 3184.22 3114.22 53 40 N 74 35 E 2845.61
4800.00 3244.33 3174.33 52 3 N 75 33 E 2924.93
4900.00 3307.13 3237.13 49 29 N 76 19 E 3002.00
0.80 981.77 N 2001.78 E 2229.57 N 63 52 E
0.29 1020.59 N 2087.06 E 2323.24 N 63 56 E
0.80 1059.00 N 2172.51 E 2416.87 N 64 1 E
4.63 1096.66 N 2257.16 E 2509.47 N 64 5 E
5.21 1133.27 N 2339.22 E 2599.28 N 64 9 E
3.62 1166.95 N 2419.20 E 2685.95 N 64 15 E
4.44 1195.32 N 2498.48 E 2769.69 N 64 26 E
1.40 1218.44 N 2576.72 E 2850.28 N 64 42 E
1.94 1239.13 N 2653.91 E 2928.94 N 64 58 E
4.48 1258.13 N 2729.36 E 3005.38 N 65 15 E
5000.00 3373.43 3303.43 48 15 N 76 31E 3076.04
5100.00 3440.04 3370.04 48 5 N 76 54 E 3149.77
5200.00 3508.27 3438.27 44 48 N 76 57 E 3221.93
5300.00 3561.78 ~3511.78 40 53 N 76 30 E 3288.93
5400.00 3658.07,e~_.3588.07 40 6 N 76 45 E 3352.85
5500.00 3734.49~-w 3664.49 40 7 N 78 5 E 3416.49
5600.00 3811.15~ 3741.15 39 59 N 79 1E 3479.59
5700.00 3887.60~ 3817.60 40 17 N 79 35 E 3542.79
5800.00 3963.68 3893.68 40 36 N 80 18 E 3606.29
5900.00 4039.37 3969.37 41 6 N 80 38 E 3670.08
0.25 1275.68 N 2802.13 E 3078.85 N 65 31 E
0.90 1292.87 N 2874.7~ E 3152.06 N 65 47 E
5.49% 1309.24 N~2945.94 E 3223.77 N 66 2 E
2.87~ 1324.86 N~3011.89 E 3290.40 N 66 15 E
0.35~ 1339.89 N~3074.76 E 3354.02 N 66 27 E
1.17~ 1354.05 N~3137.69 E 3417.39 N 66 39 E
0 60~ 1366 71N 3200.64 E 3480 23 N 66 53 E
0 44 ~1378 64 N~3263.98 E 3543 19 N 67 6 E
0.45 1390.04 N 3327.87 E 3606.51 N 67 20 E
0.52 1400.83 N 3392.33 E 3670.18 N 67 34 E
6000.00 4114.50 4044.50 41 23 N 80 41 E 3734.47
6100.00 4189.53 4119.53 41 34 N 61 7 E 3798.98
6200.00 4264.35 4194.35 41 34 N 81 7 E 3863.58
6260.00 4309.24 4239.24 41 34 N 81 7 E 3902,35
0.60 1411.55 N 3457.45 E 3734.49 N 67 48 E
0.00 1421.94 N 3522.83 E 3798.98 N 68 1 E
0.00 1432.19 N 3588.38 E 3863.63 N 68 15 E
0.00 1438.33 N 3627.71 E 3902.44 N 68 22 E
CONOCO INC.
MILNE POINT UNIT
SCHRADER BLUFF
NORTH SLOPE, ALASKA
COMPUTATION DATE: 5-FEB-91
PAGE 3
DATE OF SURVEY: 29-JAN-91
KELLY BUSH[ND ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVER[TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG
0.00 0.00 -70.00 0 0 N 0 0 E 0.00
1000.00 994.66 924.66 14 47 N 62 39 E 64.83
2000.00 1875.69 1805.69 40 23 N 63 18 E 519,20
3000.00 2477.36 2407.36 65 23 N 66 21 E 1306.81
4000.00 2871.55 2801.55 69 29 N 65 23 E 2223,88
5000.0D 3373.43 3303.43 48 15 N 76 31 E 3076.04
6000.00 4114.50 4044.50 41 23 N 80 41 E 3734.47
6260.00 4309.24 4239.24 41 34 N 81 7 E 3902.35
0.00 0.00 N 0.00 E 0.00 N 0 0 E
1.20 28.92 N 58 24 E 65.02 N 63 35 E
6.41 237.23 N 464 10 E 521.22 N 62 56 E
3.73 594.74 N 1169 OB E 1311.67 N 63 2 E
0.80 981.77 N 2001 78 E 2229.57 N 63 52 E
0.25 1275.68 N 2802 13 E 3078.85 N 65 31 E
0.60 1411.55 N 3457 45 E 3734.49 N 67 48 E
0.00 143B.33 N 3627.71 E 3902.44 N 68 22 E
COMPUTATION DATE: 5-FEB-91
PAGE 4
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE. ALASKA
DATE OF SURVEY: 29-JAN-91
KELLY BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG
0.00 0.00 -70.00 0 0 N 0 0 E
70.05 70.00 0.00 0 5 N 78 39 W
170.05 170.00 100.00 0 1 S 71 7 W
270.05 270.00 200.00 0 7 N 8 2 E
370.05 370.00 300.00 0 2 S 41 22 E
470.06 470.00 400.00 0 20 N 52 31 E
570.13 570.00 500.00 3 41 N 66 4 E
670.43 670.00 600.00 5 10 N 65 13 E
771.03 770.00 700.00 7 23 N 65 39 E
872.20 870.00 800.00 10 10 N 63 56 E
0.00 0.00 O.O0 N
-0.35 0.12 0.45 N
-0.46 0.27 0.46 N
-0.43 0.35 0.50 N
-0.47 0. 17 0.54 N
-0.30 1.87 0.68 N
3. 12 2.39 1.98 N
10.86 2.23 5.23 N
21 .71 2.46
36.99 2.97
0.00 E 0.00 N 0 0 E
0.56 W 0.72 N 51 20 W
0.68 W 0.82 N 55 52 W
0.67 W 0.83 N 53 16 W
0.73 W 0.91 N 53 25 W
0.60 W 0.91 N 41 21 W
2.56 E 3.24 N 52 17 E
9.60 E 10.93 N 61 25 E
9.77 N 19.46 E 21.78 N 63 20 E
16.24 N 33.34 E 37.08 N 64 2 E
974.52 970.00 900.00 14 16 N 62 46 E 58.45
1078.01 1070.00 1000.00 15 23 N 62 40 E 84.99
1182.57 1170.00 1100.00 18 39 N 60 14 E 115.26
1289.94 1270.00 1200.00 23 29 N 61 41 E 153.95
1399.91 1370.00 1300.00 25 2 N 61 38 E 199.44
1511.80 1470.00 1400.00 28 34 N 62 19 E 249.29
1627.72 1570.00 1500.00 32 44 N 62 39 E 307.58
1747.55 1670.00 1600.00 34 2 N 64 25 E 373.40
1868.15 1770.00 1700.00 34 14 N 64 17 E 440.69
1992.50 1870.00 1800.00 39 57 N 63 19 E 514.33
2.91
1 .60
3.79
2.92
1 .40
2.54
3.87
1.68
2.34
7.16
25.98 N 52.54 E 58.61 N 63 41 E
38.18 N 76.24 E 85.26 N 63 24 E
52.91 N 102.93 E 115.73 N 62 48 E
71.78 N 137.03 E 154.69 N 62 21 E
93.44 N 177.34 E 200.45 N 62 13 E
117.11 N 221.54 E 250.59 N 62 8 E
144.15 N 273.48 E 309.15 N 62 12 E
173.66 N 332.54 E 375.16 N 62 26 E
202.55 N 393.44 E 442.52 N 62 46 E
235.03 N 459.73 E 516.33 N 62 55 E
2128.08 1970.00 1900.00 44 20 N 63 30 E 605.55
2273.89 2070.00 2000.00 48 46 N 63 51 E 711.31
2432.40 2170.00 2100.00 51 17 N 61 20 E 833.55
2593.88 2270.00 2200.00 52 57 N 62 4 E 959.57
2773.89 2370.00 2300.00 58 48 N 62 51 E 1108.41
2982.42 2470.00 2400.00 65 8 N 66 17 E 1290.85
3231.76 2570.00 2500.00 67 46 N 64 4 E 1519.14
3484.42 2670.00 2600.00 63 10 N 64 36 E 1750.25
3718.80 2770.00 2700.00 66 24 N 66 8 E 1962.02
3995.57 2870.00 2800.00 69 27 N 65 22 E 2219.73
3.39
2.86
0.96
1 .81
0.47
2.11
5.19
2.90
4.88
0.70
276.01 N 541.57 E 607.85 N 63 0 E
323.15 N 636.58 E 713.90 N 63 5 E
381.07 N 745.01 E 836.81 N 62 55 E
441.24 N 856.61 E 963.57 N 62 45 E
510.37 N 989.20 E 1113.10 N 62 43 E
588.33 N 1154.47 E 1295.73 N 63 0 E
679.55 N 1363.82 E 1523.75 N 63 31 E
783.95 N 1570.89 E 1755.64 N 63 29 E
871.29 N 1763.99 E 1967.44 N 63 43 E
980.05 N 1998.01 E 2225.42 N 63 52 E
4277.69 2970.00 2900.00 66 44 N 65 57 E 2483.32
4495.18 3070.00 3000.00 58 32 N 68 38 E 2676.17
4675.89 3170.00 3100.00 54 0 N 74 15 E 2826.27
4841.48 3270.00 3200;00 51 30 N 75 46 E 2957.22
4994.85 _3370.00 3300.00 48 14 N 76 30 E 3072.24
5144.64 3470.00 3400.00 47 31 N 77 8 E 3182.45
5284.39 3570.00 3500.00 41 22 N 76 37 E 3278.80
5415.60 3670.00 3600.00 40 7 N 76 50 E 3362.78
5546.35 3770.00 3700.00 39 53 N 78 38 E 3445.78
5676.94 3870.00 3800.00 40 12 N 79 30 E 3528.19
5.79 1088.35 N 2238.53 E 2489.08 N 64 4 E
3.97 1165.44 N 2415.38 E 2681.85 N 64 15 E
2.29 1213.21 N 2557.97 E 2831.10 N 64 38 E
1.77 1247.20 N 2685.48 E 2960.97 N 65 5 E
0.28 1274.78 N 2798.40 E 3075.07 N 65 31 E
2.34 1300.31 N 2906.96 E 3184.53 N 65 54 E
3.66 1322.47 N 3001.93 E 3280.32 N 66 13 E
0.59 1342.19 N 3084.54 E 3363.91 N 66 29 E
0.62 1360.04 N 3166.86 E 3446.55 N 66 46 E
0.39 1375.94 N 3249.33 E 3528.65 N 67 3 E
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE, ALASKA
COMPUTATION DATE: 5-FEB-91 PAGE 5
DATE OF SURVEY: 29-JAN-91
KELLY BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTZCAL VERTZCAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IOO FEET FEET FEET DEG
5808.32 3970.00 3900 O0 40 37 N 80 21 E 3611.58
5940.70 4070.00 4000.00 41 17 N 80 40 E 3696.23
6073.97 4170.00 4100.00 41 31 N 81 4 E 3782.13
6207.55 4270.00 4200.00 41 34 N 81 7 E 3868.46
6260.00 4309.24 4239.24 41 34 N 81 7 E 3902.35
0.34 1390.95 N 3333.21 E 3611.79 N 67 21 E
0.30 1405.19 N 3418.77 E 3696.29 N 67 39 E
1.03 1419.30 N 3505.72 E 3782.13 N 67 58 E
0.00 1432.96 N 3593.33 E 3868.51 N 68 16 E
0.00 1438.33 N 3627.71 E 3902.44 N 68 22 E
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE, ALASKA
MARKER
LAST READ[NG GCT
DRILLERS TD
COMPUTATION DATE: 5-FEB-91 PAGE 6
DATE OF SURVEY: 29-JAN-gl
KELLY BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
INTERPOLATED VALUES FOR CHOSEN HORIZONS
SURFACE LOCATION = 2948' FNL & 3756' FEL, SEC33 T13N RIOE
MEASURED DEPTH TVD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST
6080.09 4174.5B 4104.58 1419.93 N 3509.73 E
6260.00 4309.24 4239.24 1438.33 N 3627.71 E
COMPUTATION DATE: 5-FEB-91 PAGE 7
CONOCO INC.
MILNE POINT UNIT I-2
SCHRADER BLUFF
NORTH SLOPE, ALASKA
DATE OF SURVEY: 29-JAN-91
KELLV BUSHING ELEVATION: 70.00 FT
ENGINEER: K.BARNARD
*****e****** STRATIGRAPHIC SUMMARY
SURFACE LOCATION = 2948' FNL & 3756' FEL, SEC33 T13N RIOE
MARKER
MEASURED DEPTH TVD
BELOW KB FROM KB SUB-SEA
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
LAST READING GCT
DRILLERS TD
6080.09 4174.58 4104.58 1419.93 N 3509.73 E
6260.00 4309.24 4239.24 1438.33 N 3627.71 E
FINAL WELL LOCATION AT TD:
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET DEG
6260.00 4309.24 4239.24 3902.44 N 68 22 E
SCHLUMBEROER
O I AEC T I ONAL SURVE Y
COMPANY CONOCO INC.
WELL MILNE POINT UNIT I-2
FI ELD SCHRAOER BLUFF
COUNTRY USA
RUN ONE
DATE LOOOEO 29 - JAN - 9i
REFERENCE ?4326
WELL:· MP, U I-2
(2948'' FNL, 3756' FEL, SEC 33, T13N, RIOE)
HORIZONTAL PROJECTION
4OOO
10{30
-2OOO
~ou'rH -3000
-2000
SCALE = l/10130 IN/FT
~ I I i i ~ i ~ ~ ~ T"i r~--~-~---~-~+-+?"-~T+~ ~ ~.~-..~..LI..~_ ~ ~.~ -,.L.~-L..~..~..~ ~ i ~ : ~ ~ ~ :. ~ ~ ~ *.
' ' ~ ' ' ' ~ ~ ~-~ -: ~ i ' ~ ~ ~ ~ ' '"'~"' '*T'~'"*"~ .... ~ ............. t*"~-~ ~-~-
] ~ ~ ~ { I : t i ~ ~ ] ~ : : i : : i i . f . i [', : ~ ~ ; - · ;~-~ ~ ~ ~ ~ ' '..,.~_~. :.: : . : ~ : ~ ~ ~ : ~ ; , . '
~~,-,.~4.~:~-~.~,-~.~.~.~ ~ ~ ~ , ! ;, i~ ; _t_~:: ~ , ~ T ~ ~m' ~"T~-~++'''~ i~
~ ' : ! ~ ~ ] , i ~ ~ ' ~ i ~ } t , ~ ~ ! i : ; ~- T ~ , : ~ ~: :~ :T:::~ ~ r ~ . 4-~-- ..~.~..~.. ~ ~ .~. ~ : : ] :
~~----~.~..~.-.;.....:-4---~..4.-..-~-~--i-.-i---~..~_~.MM~~ ~ ~ : i i i ~ ; I t't"~T"'~"'r~ .... ~'~-I-~-
-- i i t I ~ tm'~m't"'T-:-r",-4-"+-'+--t-ff-~ ~ ~ i ~ -~ ~ ~ i i ~'-~ ~ ~ ~ , ! ~ ~ ~ ; '. ~ ~ ~ ~ ~ ~ ;
~~.~.~4..l-i-~.~i-l~..;: ! ~ ~ i ~ I i ~-iq-; :~ ?'T1"t"-h .... i~'T~ ...... T'I"I'"~"I'"+'~'"?'+'-
:] ~ ] ~ 1 i'tT-"t'fi"?'~:'t"ti'"! ..... i' H...ff-~-e-t 14: i-~ ~' 4~-~4.~-~...? 4.~.. ZL~.... Z.i.i:.. ~4_J. ,~
d I I I i ~ ~ ~ ' ~ ~ ; ; ~ ~T'~~l ~ i i i l't:7-1-~i ~ ~ ~ i i i ~ ~'~-~+--:-+i ~
.... ~-4 ..... ~4 ~.~--..4~...; ..... - ~ : J t , . i I , i ' . ~ T ~ ~'"'~: - :
~ r ~!~'~1T!--.?f.-~ ...... t-t-t-.t.. ~~:.--~-~ ..... H~-. +.~++-H-H- ,-~...:...;...~ ....... ;...~-;..4...,..H-b.~ ..~...~..~ 4.. H..L,4...;: i
- , ; : : : - ~ ..... +-~-.* .... ~-..e.-~.-~-- ' z ~ ...... ~. : ; : } , i I s . ·
~ ~ ~ ~4--~-~,..~ ...~...q...'... ..= : ~ : ~ : ~ : : ~ i ~ ~ = ~ : ; : . . : : ~ i . . ~ ~__-........~,...,...,-...~..--~...f._
_~ ~ ~ i I ~ ~ i ~ ~ ~ ~ T '7" ' yT"r"Y' "'~T~''''~ 'T'" ~*~ -?+.+4- -~... ~.,...,..ff ~ + , 4~-, ~ -~ .4- ..~.4-~ 4 i- * ;..4 ..... :...~ .....
M iiI ! I ~ I ~ ~ T'Y/"~"T'T"~ ...... T~'T"t .... , , ~-i i i ] ~ ' ~--~~+-.,~,.~i..M-~-~4-. ,.~.~4..,,..&.4-i 4~ ~, .i-4...~...~.. :.. h..~.
- ~ T ~- '7-~-?'~'~"~-~+---~-~-~-.-~ ~ : ; , i ~ ~ ~ i i ~ ~ ..... :. : ' , ~ ~ { ~ ~ ' ~ ; ~ ~ ~ : ; 7 'T ~'.
.... ~ .~ T ~ ~ ~'"~ ..... ?-~"~'*"- < : : ' ' ~ ; .... 4 ~ : : : : : ~ ' ' ' ' ...... ' ~ : : : ' ' ' ' : '
~ i: i l { ,i, i ~ ' { { ~ ~ i] ~ ~ i ~ i ~ i ~ ~ ~ ~ ~ ~ i '': EI { ~ { ~ [ [T'-T"7"'TTT'TTTT"TTT~ l"TT-'IT-"YT"':"T't'!':'"t"7
~ ~ : ~ ~ ~ i il, ~ ~ ; ! I I ! I { T ]? i I ~~-*?~"'?'" 'T'~t-~'~+~ ~..+..~..4..+..?.~..¢.+...
~r~.~-+-+-~ ......... ~ ............. 1 ........ :-4.-.~-~f _ ~ ~ ..... ~ ~ ..... ~ ~ : ~ ...... ~ ~ ~ ..... m'",'":": .............. ,
-4 ! - ~ ~ ! ~ ~ ~,..L~-~4_~..~~ : ~ I ~ ! ! I { i i ~ i ~ ; i ~ I ]~.TTTTTTT.~.T~..T~..T.~T-T...T...T-T.....T.~t..~..+..?~?..~..r..?..~..~..~ ...... ,.+..?;...~...H
:2~ ~_~.~ ~ ~ ~ ~)~ : :~-"~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~'~-~ ..... ,.~-.-~-+--~-..r--?-+.~.-+-.-..+..H+-.~---f-.r-&...~ ........ ~ ....... ~ ...... ~...: ...... ~...~ ....
7"';'","'?": ..... :'"::":
~/~ ~.~ ~:::T::~ c"'yt?'~,-t~'T'~-' '-tT-~H'-~ ~ ~ ~ ~ ~ ~ j~.::::~ fH.--?~.~..~.4...H...~..-;.-.L.:..-~ ...... ~..-~..;..~4-b-¢...L; ....... ;4...; ................. ~ .......
I [I .... ~T'T'~ ....... JT'T'T"~"T'TT~T ...... ~*'T~-'~'%~¢- ? ~ :~ ~ ; ~--,~-~--+~-..~,.4.-~...~ ...... +...;...!,_~...~..,¢...r..;...+.,.L._¢..,+...+...~..., ........... :.,.; ....... ;.,.~...,,..,,.4,,,; ...........
~ ~ ~ ~ T"~'w~r-?'T~'~-~ ~ ~ ti k4+~~-~-.~-..--+~+%H.+-~...+...,-.+..H.-+..~...;...b;..; ...... ¢-.~ ........... ~...;..~...,...;_
;iq ~ r'~'~" 'T!-t-t ....... Y't't"~ ...... i'+++-'-~;-++~+++--~+H-.f.~..;--i.--; ...... H...;...iq...bi...L.~ ........ LLL.Li...LLL;...'...;...LL ;i..L:.:..L
/ I I ~ i ! ~ ~ ;" C~ ~71'~: ..... 1-I"!-~ ....... ~'t~',''t'~e ~;*-~;?~-+~..4.-.? 4---?.*..-~.+..¢-.i ..... ; ....... ;.4...i.., , ;. L.;,-i ...... L.4-.; ...... ~ .............
~-~-~-~-.M-.;..;..., ..... +..4-,...~ ...... *.*4-..*-4 ~ ~;-&~ ~-~.~&. ~4- ~.: 4-~ '-i-~ : i .... ~ : ~ I : : : . * T T
i ~ ~ ~ ~T~ T TT'T-]'"~'T"T"? ........ ?-'~'"T'"T"TTT-T-T"'~"~-T-TT'[~"T'"T-T ....... T"T*T"T'*~"7"T"T"T ....... ?T'"T'"':'*"t''~ ~ ~ ..... ~'"Y'T .........~ T..-?.. r..~ .......... 7"' '~ .....
2000 3000 4000 5000 6000
EP~T
- I OOO 0 1 o0o
WELL' 'M'PU
-2
(2948' FNL, 3756' FEL, SEC 33, T13N,R10E)
VERTICAL PROJECTION
.i
248.
N
-2000 - ! 1300 0 0 ! 1300 L~ 3000 .4000 BO00
i ~ ) ) : ; ) ; ] ) ) ~ t ~ ~ I ( / f ) r ( ~ ~ ~ T ! i ~ I i ) ~ i f ~ i ) ~'T'I "~'~T" "T'?T'~"I "~'T"~ ..... T"~'~'" "~"r"~"J"~"'+''-
'~:ii ~--iTT-t; ~' ~~'~ i Ct ~i~'r ri i'~ f~T'~mT'!"t'i"¢i"4-~--.'~-+r't-t"'?--t': ....... t.-.t-+..t....-+-.r-f--f-.f..~..~.,-.+..-
~, ~ ~ ~ ~ :- · ~'~- ~- ~- F r,; , -~ , ~ r- ~- , ~ ~-~$~.*-.-~.-..-.~+m-?--~-~ ~.~
?~'TT~"'f~-'P~---t"~"K Ft~', -~ fiii ~ ;~ ~ i - i i + ( ~-~+%e?~..~..-~'-f-~e--~,+..~q..t.4,-+,~
~i]~ ~+ ~-+.-~..+~-~ k+:~.-~-~ ~ ~ ~ ~ ~ ,~ ~ ~ -+~T~.-~..~,-~..~-~-~-~ ~.
.... t
· ~.-4 ....... ;-+-+-H ' ..+.+..;..¢-. '-+-$--.H+-, ,..~.~'-+++.$ .... ~:+~---+~--~---~::H~ 4 :~-,.~4.~ ..+-.~..;---;----~--+.-~.+..HL;..~.,.
-~t 't~'"-'r't"??"l't'?( ...... t "?t-?"t"?'r"?'t-' "t'ttt ,-?~ ~ t ~' ..+t.~f., ..i.,;.i..i_ ~-4,~J.-~ I~ "t~tr-'
LI I I I : iJ ] i ~ J ~ i l~j ~.~-~ 1"~ ~ [ ~ ; ~ ~_! J Li ] ! ~ ~ ~ i ~ [ ~ i ~ ~ ~~ ~ i J i [ i i i
P ~ i : ': ;- ;~4 H: ~+~-4..~..~ .,4---~...~-..~.-.?.,.;...~..4-~..~ ,~ ~.~ ~ - ; J : : i- ~ .,~.4~ ~~..+-,~,., ...~,~.~.. ~-~-~. ,..4..~.4..,a...+..,~ ....... ;.,
'Ill ' ' ~' ~ ........ -~'~-~" 't"?'"?'~'- "~'"?-'7'"?.: , : [ ...... ?"~"!'t ..... .... ~'-! : 'r ' : ~l -- ~ i w f. ~--: ' .~e,T..~ ~ : ' .~i. i~ ! .~ "~'"~'~--t:; ..... ~T'~?'" '~'~'"~"; ..... '"'~"~'~'"ill
F"~'TTT?-T"~ ....... T'TTTT'T'T'~" "T'T"?T' T"?T'T'T"~"TTT'T""'T'T"?'T" "'?TT'T ..... T"TT'T ..... T'"T'":'"t ...... T"T"r"T ...... ; 'T'T"~ ....... T'T'T"T ...... T'T'T"T"~ ";' ':'; ....
"'T~~~"" ~"~""-~'~"~'" "~'"~"t'"?'T"t-T-?? -r'~'r" ~-t- -~ --~?.~t ..... r"t'"+"f ...... ?-m.~ ......... ~'-'t~ ...... ~-?.'t'.,' "T'~.'.r'-~..-T ........... r"r..
-~..4-H~.~4~-.,~-..i...~..-~ .-$...~...,.," 4.....4.-4 ....... ~...l...~...~...;,.4.-i ,-i-.~ = ~ ~ :X- ~ G: ~ ~ .... i-4..~ ...... $...~..~...;...,...~..~..~...$.- ..~4...~...~ ...... ;-~..-~...~......4-.;...;,..; ....... ~...;. ,: ......
~-,~..4~.,.~-.~-.~ ........ 4 ...... * ..... 4.,.~,-~.,~ ...... ~-..~ ....... : .......... ~...~-~.. -.~ ....... ~ ....... 4.4~- -~.~.~ ..... ~,4~...~-. - '.,.~...' ..... ~...*,.4...~...~ ...... ~ ...... '...~...-.4..~-4,.4 ........... ;..4 ..... ~ ................
-+~'+- s~'...-+H-+'~.-H-++.- .+.H...H.+-~..H ...... ~+.~ ~..~+ ~; ~:~_x .~_~¢,,4...bb.bH..H...;_ ~..-;¢-.H--~++.....b+..H...bF ;...b~
-..~¢.- ~. -~.4-+-; -~ ;-; .4-;.; ..; 4 -;; ¢4.. ~ * ~ ~ ~ ~ -~;.4-~4 .... ~.~ 4..;..+..;.~..;-4.- ~.; ~. 4 - - ;, 4. 4~ ,4-.;. ~ ..; ~ .., ,...;. = ...
I i I , , i : : . : : · ; : : , : : , : : : : : ~ i !: ~ : I; ; ~ : : i : : . ~ : : : : ; : ; : ; : ~ i ; ~ : : , . :
~4 ....~- ~-~. · ~.- ~ ~ ..... ~ ~ ~ · ' -4 ,. * 4. ~-~ i : ~ s ~ ~ ~ ' ' ~-. ~...~..4..~. ~,..~ .., ,4.~ * ~ -- ~ :. 4,. ~
-~-~--~-~-*"~-'~-~'.-e'-T--~."t-T.r-? ~ ; ~ ~ ~ ~ v i a ~ ~~-~'~"m'~"?"'?-T"t"r"?-~?~'""~"~"."~'"'-'t"t"~'"~ ....
-~~'"T'~'~'~'"T'' "T'-T"~'T"~'-Y~ ~ [ ~ i ~ ~ ~ ~ i i ~ ~ J : ? ~-~T~T'~"r"r""'~"T"Y"Y'"'~'T-T
~+~--+%-.~%-~.fi .-+-.f.-~--4 ...... ~..+..+..+..~ ~ ~l +, ~, ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~-~-+-?-~.-~-+%.~.-.~...+ ........ ~-.*..,*..,+ ....... ~...+...+ ...* ....... r ....... t ...................
-.4.~-+.-4-..~ . ~"t"'4"4'"L"~'-': ~ ~ : ,.4..4-.;..-;-;...~.-¢...~..4...: ~ ! ~ I : i ~ ~ .-4...;.,-;~: ~ ~ ...... T ~...~..4-~-: '. t i ~. ~1 ~:: -~ {l ~' ~: :' ~ ~ !,~: ~~/"'~";'~'~ i ~ ~ ...... ~..;...~.-;..4...¢.-L..;....i;:; ~ : ~ : ~ ....... ,_.+...4...,~:; . ..... ~ ~...;..f.-¢~... ......,
.......... , ....... , ....... ....... ..... : ................
'~f? .... t~?~""?t+?i'"t'"f"r'?" "~'~"~?~ ~ ~ ?t~ ~ ~ ~ ~-?~"t"f'~ .... ~-.t..-~-f+-~.=-~...: ....... ,.,.,...~ ....... t...?..?.:...~ .................. ~ ...........
· -~,-~+~.~-~-H-.~..,--+-+--~-4--,t..~-.~-~ i ~ ! q i ~ h. ~-~--~..-+-4-~.4.++-4-.,...~ ....... ~-4-.+-4-4.-.~-~..+.~ ..... ~...+...:..~
, , , · . , : . : : : : : : . : , : : : : · : , : , : : ; ; ! ~ : t [ ) : : ; : ! : [ : : : : : r : : · : , : , , . :
PROJECTION ON VERTICAL PLANE 68. - 248. SCi)LEO IN VERTICAL OEPTHS HORIZ SCALE = 1/1000 IN/FT
AOGCC GEOLOGICAL iviATE~.iALS iNVENTORY LiST
COMPLETION DATE ,,~ ../ ,.~ /.ql CO. CONTACT
check off or list data as it is received.*list received date for 407. if not rcouired list as NR * ~-i drillin~ histo~-~ survev well tests core descri
I LOG ~.,nc, ,r- ' i RUN INTERVALS SCALE
NO. {to thc nearest foot) {inchl100']
,
i
~1 I
i
, ,,
.
...................
[i8!
~ ,
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLCX~Y CORPORATION
HOUSTON. TEXAS 77251-2 t 75
PLEASE REPLY TO
~'~ ! 3 1991 SCHLUMBERGER WELL SERVICES
Pouch 340069
?rudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
CONOCO, Inc.
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineberger
Gentlemen:
Enclosed are 2 BLprints of the
Company CONOCO, Inc.
Completion Record, Run 1, 2/14/91
on:
Well
Milne Point Unit I-2
Field Milne Poipt /Schrader Bluff
Additionolprintsare beingsentto:
1BL nrints
CONOC6, Inc.
600 North Dairy Ashford
Houston, TX 77079
Attn: George Lamb - OF 2018 PER
County North Slope State
1BL prints, 1RF Sepia
CONOCO, Inc.
1000 South Pine
Alaska
Ponca City, OK 74603
Attn: Glenn Welch 7360RDW
1 BL mrints, 1 RF Sepia
OXY U' S.A., Inc.
5 Desta Drive
Midland, TX 79710
Attn: John Carrol
*(915/685-5898)
1BL prints, 1RF Sepia
Chevron U.S.A.
11Ill South Wilcrest
Hosuton, TX 77099
Attn: Priscilla MacLeroy
*(713/561-3652)
~I~sk~ Oil & Gas Gouserv~Xbion
3001 Porcupine Drive
chora~e.-AK 99501
The film is returned to CONOCO,
Ponca City.
We appreciate the privilege of serving you.
prints
~prints
prints
Received by:
Date:
Very truly yours,
SCHLUMBERGER WELL SERVICES
Raymond N. Dickes
DISTRICT MANAGER
SWS--I327.F
CONOCO, Inc.
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION
HOUSTON. TEXAS 7725! -2 ! 75
PLEASE REPLY TO
SCHLUMBERGER WELL SERVICES
......... ~ Pouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineber~er
Gentlemen'
Enclosed ore 2 BLprintsof the
Company CONOCO, Inc.
Gravel Pack Log, Run 1, 2/17/91
on:
Well
Milne PointUnit I-2
Field Milne Point
Additional prints are being sent to:
1 BL prints
CONOCO, Inc.
600 North Dairy Ashford
Houston, TX 77079
Attn: George Lamb - OF 2018 PER
.County North Slope ..... State
1 BL prints. 1 RF Sepia
CONOCO, Inc.
1000 South Pine
Alaska
Ponca City, OK 74603
Attn: Glenn Welch 7360gDW
1 BL prints, I RF Sepia
OXY U.S.A., Inc.
6 Desta Drive
Midland, TX 79710
Attn: John Carrol
*(915/685-5898)
1BL prints, I RF Sepia
Chevron U.S.A.
11111 South Wilcrest
Hosuton, TX 77099
Attn: Priscilla MacLeroy
*(713/561-3652)
A!ask~ Oil & Gas ConservationXx
Commission . ~
__3001 Porcupine Drive . ~
~.~_Anchorage, AK 99501
A~: John Boyle ~/
The film is returned to CONOCO,
Ponca City.
We appreciate the privilege of serving you.
prints
prints
prints
Very truly yours,
SCHLUMBERGER WELL SERVICES
Raymond N. Dickes
DISTRICT MANAGER
SWS-- ! 327-F
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION
HOUSTON. TEXAS 77251-2175
FEB 0 3 1991
CONOCO, Inc.
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineberger
~SE REPLY TO
BCHLUMBERGER WELLBERVICESPouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernle/Shelley
Gentlemen:
Enclosed ore_2_BL_prints of the GCT, Run 1, 1/29/91
Company CONOCO, [nc,
Well Milne Point Unit I-2
on:
Field Milne Point/Schrader Bluff
Additional prints are being sent to:
1 BL prints
CONOCO, Inc.
600 North Dairy Ashford
Houston, TX 77079
Attn: George Lamb - OF 201~ PER ...
County North Slope
State Alaska
_L_]~rints, 1RF Sepia
CONOCO; ThC,
1000 South Pine
Ponca City, OK 74603
Attn: Glenn Welch 7~6ORDW
I BL prints, 1RF Sepia
OXY U.S.A., Inc.
§ Desta Drive
Midland, TX 79710
Attn: John Carrol
*(915/685-5600)
__[_J~rints, 1 RF Sepia
Ghevron U.S.A.
_ 11111 South Wilcr~_.~t_
__ Hnu.~tnn: T~w~ .q 77f}qq
Attn: Priscilla MacLeroy
,.'713/561-3652
~ts, 1 RF Sepia~
Alask~a Oil & Gas Conservation
CommJ ssi on
3001 Porcupine Drive~
Anchorage, AK 99501~
x-~t t n: John Boyle ~
The film is returned to Conoco,
Log Library.
We appreciate the privilege of serving you.
prints
prints
prints
ReceJ ved by:
Date-_~r''v~//~ "' , ,
Very truly yours,
SCHLUMBERGER WELL SERVICES
David M. Saalwaechter
DISTRICT MANAGER
SW$-- 132
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION
HOUE~TON. TEXAS 77251-2 175
FEB 0 ~ lg91
CONOCO, Inc.
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineberger
~UIE REPLY TO
sc~uus~£~ W~LS~,C£SPouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
Gentlemen:
Enclosed ore_Z_SL_prints of the.
Compony CONOC0, Inc,
Well Milne Point Unit I-2
Perforating Record, Run 1, 1/31/91
.on:
Field Milne PoJnt/Schrader Bluff
Additionol prints ore being sent to:
1 BL prints
CONOCO, Inc.
600 North Dairy Ashford
Houston, TX 77079
Atgn: George Lomb - OF 2018 PER
County Nartb Slope Stote Alaska
_l_JlL_prints, 1RF Sepia
CONOCO: Tnc~
1000 South Pine
Ponca City, OK 74603
Attn: Glenn Welch 7360~DW
I BL prints, 1RF Sepia
OXY U.S.A., Inc.
6 Desta Drive
Midland, TX 79710
Attn: John Carrol
*(915/685-5600)
_l_Jlb_prints, 1RF Sepia
Chevron U.S.A.
11111South._Wilcrmmr_ .
_Houston: Towa~ 77DqO
Attn: Priscilla MacLeroy
,'713/561-3652
/A~as~a Oil & Gas Conservat~gon
/- Commission
/ 3001 Porcupine Drive
[ Anchorage, AK 99501
\ Attn: John Boyle
film is returned to Conoco,
Log LJbrary.
We oppreciote the privilege of serving you.
prints
prints
prints
ReceJ ved bv:
Date:
Very truly yours,
SCHLUMBERGER WELL SERVICES
David M. Saalwaechter
DISTRICT MANAGER
Sw$-- 1327.F
STATE OF ALASKA - ~,i ~; .
ALASt'~ OIL AND GAS CONSERVATION COMMISo~ON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend
Alter casing m Repair well
Change approved program
Operation shutdown Re-enter suspended well __
Plugging __ Time extention __ Stimulate X
Pull tubing~ Variance Perforate X Other X
Name of Operator
Conoco Inc.
Address
3201 C Street, Suite 200 Anchorage, AK 99503
Location of well at surface
2948' FNL, 3756' FEL, Sec. 33, T13N, R10E, U.M.
At top of productive interval
1680' FNL, 700' FEL, Sec. 33, T13N, R10E, U.M.
At effective depth
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
NSB AK
NSB AK
At total depth
1456' FNL, 159' FEL, Sec. 33, T13N, R10E, U.M. NSB AK
6. Datum elevation (DF or KB)
KB 35' AGL
7. Unit or Property name
Milne Point Unit
Well number
I-2
9. Permit number
90-91
10. APl number
50-029-22066
11. Field/Pool
Schrader Bluff
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor 115'
Surface 2800'
Intermediate
Production 6221'
Uner
Perforation Depth: measured
6256' feet
4309' feet
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
feet
feet
Plugs (measured)
Junk (measured)
Size Cemented
13-3/8" Surface
9-5/8" Surface
7" T.O.C. @ 4000'
Measured depth
115'
2800'
6221'
True ve~ical depth
115'
2400'
4285'
RECEIVED
JAN 1] ]99I
Alaska.Oil & Gas Cons. C0mmissl(
; ulch0raga
13. Attachments
Description summary of proposal X Detailed operations program __ BOP sketch
14. Estimated date for commencing operation
1/27/91
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas
Suspended
Service
17. I hereby cert!fy that the foregoing is true and correct to the best of my knowledge.
SigneC_~,(~'~ ~~ Lineberger Title Sr. Production Engineer
~: _~_ ___~_ FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Date 1/9/91
Plug integrity ~ BOP Test
Mechanical Integrity Test
Approved by order of the Commission
Location clearance
Subsequent form required 10- ~ 7
UI~IG]NAL SIGNED
BY LONNIE C. S~]TH
feet
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
MILNE POINT UNIT I-2 WELL
PROPOSED COMPT.F. TION PROCEDURE - SUMMARY
1/7/91 - CVL
NOTE:
Hold frequent on site safety/environmental meetings
prior to all potentially hazardous tasks.
1. MIRU on I-2 well. Test BOP's.
2. GIH w/ bit and scraper to PBTD. Reverse circulate well clean.
3. RU electric line. Run Gyro survey (if necessary). Correlate
with open hole logs and perforate "0" sands at 5 SPF over
5898'-5940' and 5982'-6018'. RD electric line.
4. GIH with squeeze packer and set above top perf.
5. MIRU frac equipment. Pressure test all lines. Pump frac job
to stimulate "O" sand perf's. RD frac equipment.
6. Clean out proppant from wellbore, if necessary.
7. RU electric line and set gravel pack sump packer above "0"
sand perf's and below proposed "N" sand perfs.
8. Perforate "N" sands at 12-24 SPF over 5710'-22', 5742'-58',
5775'-82' and 5803'-26' utilizing electric line or tubing
conveyed perforating (TCP). If TCP is used, apply 300 psi
underbalance and allow well to flow for approximately 20 bbls.
Kill well and POOH.
9. PU gravel pack assembly and GIH.
pumps/blenders and test surface lines.
packer.
RU gravel pack
Set gravel pack
10. Pickle workstring. Establish injection profile. Pump gravel
pack. Stress test gravel pack and POOH.
11. PU and run electric submersible pump (ESP) on tubing. Freeze
protect. ND BOP's and NU tree.
12. Leave well shut in until surface equipment installation is
complete.
RECEIVED
JAN 1 1 19,91
,Oil .& Gas Cons.
Anchoraoja
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon __ Suspend __ Operation shutdown .X_ Re-enter suspended well __
Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __
Change approved program __ Pull tubing __ Variance ~._ Perforate __ Other __
2. Name of Operator
Conoco Inc.
3. Address 99503
3201 C Street, Suite 200, Anchorage, AK
4. Location of well at surface
2948' FNL, 3756' FEL, Sec. 33,
At top of productive interval
1680' FNL, 700' FEL, Sec. 33,
At effective depth
T13N, RIOE,
T13N, RIOE
At total depth
1456' FNL, 159' FEL, Sec. 33, T13N, RIOE
5. Type of Well:
Development __X
Exploratory __
Stratigraphic __
Service __
U.M. N.S.B., AK
6. Datum elevation (DF or KB)
KB 35 AGI,
7. Unit or Property name
Mille Point Unit
8. Well number
[-2
9. Permit number
90-91
10. APl number
50-- 029-22066
11. Field/Pool
Schrader Bluff
feet
12. Present well condition summary
Total depth: measured
true vertical
6256 feet
4309 feet
Plugs (measured)
Effective depth: measured feet
true vertical feet
Junk (measured)
Casing Length Size
Structural
Conductor 115 ' 13-3/8"
Surface 2800' 9-5/8"
Intermediate
Production 6221 ' 7"
Liner
Perforation depth: measured
true vertical
Cemen~d
Surface
Surface
T.O.C. @ 4000'
Measureddepth
115'
2800'
6221'
~ueverticaldepth
115'
2400'
4285'
RECEIVED
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
DEC 1 1 1990
Alaska 0il & 6as Cons. Comm'tss'tot~
Anchorage
13. Attachments Description summary of proposal X
Shutdown drilling rig operations pending
14. Estimated date for commencing operation
2/9].
16. If proposal was verbally approved
com
Detailed operations program __ BOP sketch __
)letions with workover rig.
15. Status of well classification as:
Oil X Gas __
Suspended __
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ ~,,..b..~, ,..~. Title sr. Drilling Engineer
~teve Rossber~ - ~-"- FOR COMMISSION ~USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Mechanical IntegrityTest__ Subsequent form required 10- ~
ORIGINAL SIGNED B'~' Approved Copy
LONNIE C g~.~TU Rclurnpd.
~"~ i'
Approved by order of the Commission ~.. JOk!C- ?Jll~---~ommissioner
Date ].2/7/90
JApproval ¢,~ '--'~'7 /
No.
/, ,
Date
Form 10-403 Rev 06/15/88
SUBMIT I~ TRII~LICATE
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION
HOUSTON. TEXAS 77251-2175
NOV 0 6 10g0
CONOCO, Inc.
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineberger
I~t. EASE REPLY TO
SCHLUMBERGER WELL SERVICES?ouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
Gentlemen: DIT-E, NGT, CNL(PORO), CNL(RAW).
Enclosed ere2 Bl. prints of the Cyberlook, Run 2, 11/O3/90
Company CONOCO, Inc
Well Milne Point Unit I-2
on:
Field Milne Point/Schrader Bluff
Additional prints ore being sent to:
1 BL prints
CONOCO, Inc.
600 North Dairy Ashford
Houston, TX 77079
Attn: George Lamb - OF 201~ PER
County North Slope State
_L_BL_prints, 1RF Sepia
CONOCO, Tnt,
1000 South Pine
Alaska
Ponca City, OK 74603
Attn: Log Library
1BL prints, 1RF Sepia
OXY U.S.A., Inc
6 Pe~Y~_Dx!xe
Midland, TX 79710
Atgn: John Carrol
*(915/685-5600)
_lJlL_prints, 1RF Sepia
Chevron U.S.A.
_11111 South.WJlcrmmt_ .
:_Houston; TPw~ 770qq
Attn: Priscilla MacLeroy
.~713/561-3652
1 BL 1 RF Se "
A1 0il & Gas :zon
-~'C ommi s s i on
)1 Porcupine Drive.
Anchorage, AK 99501
Attn: John Boyle
The film is returned to Conoco,
Log Library.
prints
prints
r {CEIVED
NOV 0 9 1990
Naska 0il & Gas Cons. Commlesion
Anchorage
Received by:~ ~
Date:
We appreciate the privilege of serving you.
Very truly yours,
SCHLUMBERGER WELL SERVICES
David M, Saalwaechter
DIETRICT MANAGER
5W$-- t 327-F
TO:
THRU:
FROM:
MEMORANUUM State of Alaska
ALASKA OIL AND GAS CONSERVATION COMM_ISSION
Lonnie C. Smi DATE: November 8, 1990
Commissioner ·
FILE NO: JT. DA. 118
TELEPHONE NO:
SUBJECT:
Diverter Test
Conoco's MPU I-2 Well
Permit No. 90-91
Kuparuk Rv Field
r e ._ ro I eu~--~n s p e c t or
e_.t 28, 1990: I traveled this date from BPX PBU to Conoco's
--'%o inspect the diverter system and witness the function
test. i found all components of the diverter system to be in
compliance. However, I did have Conoco representative, Joe Polya, add
a 40' section of !0" pipe to the vent line paralleling the rig so that
the end of the line extended past the pipe shed. I stopped by the rig
later this date and confirmed this addition.
In sun, nary: I conducted an inspection of the diverter system at
Conoco's MPU 1-2 well on Nabors Rig 27E.
02-00lA (Rev. 6/89)
20/ll/MEMO1.PM3
SCHLUMBERGER WELL SERVICES
A DIVISION OF SCHLUMBERGER TECHNOLOGY CORPORATION
HOUSTON. TEXAS 7725 I-2175
OC T 3 ! 1990
CONOCO, Inc.
3201 "C" Street, Suite 200
Anchorage, AK 99503
Attention: Van Lineberger
~$E REPLY TO
SCHLUMBERGER WELL SERVICESPouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
Gentlemen:
Enclosed ore2 P,l. prints of the
Company CONOCO, Inc.
Milne Point Unit I-2
Well
BGT, Run 1, 10/30/90
on:
Field Milne PoJ. nt
Additional prints ore being sent to:
1 BL prints
CONOCO, Inc.
600 North Dairy Ashford
Houston, TX 77079
Attn: George Lamb - OF 2018 PER
,,County North Slope __State. Alaska
_l_BL_prints, 1RF Sepia
CONOCO; Tnc~
1000 South Pine
Ponca City, OK 74603
Attn: Log Library
1BL prints, 1RF Sepia
OXY U.S.A., Inc.
6 PC_s_t~._P_~_i~e .
Midland, TX 79710
Attn: John Carrol
*(915/685-56OO)
_l__]tL_prints, 1 RF Sepia
Chevron U.S.A.
§O01 Bollinger Canyon Road
San Ramon: CA 94583-0943
Attn: Priscilla MacLeroy
*(415/842-to00)
lB L~Se pi a~""~
A~k~a Oil & Gas Conservatio~
J Commission _
3001 Porcupine Dri~~[
Anchorage, ~ 995~ ~ ,,,
~Attn: John Boyle ,.,~~:~ ~ .....
Gas Cons. commission
The film
~o¢ ~Jb~ar~.
We appreciate the privilege of serving you.
prints
prints
prints
Date:/
Very truly yours,
SCHLUMBERGER WELL SERVICES
SWS-- 13274:*
David M, Saalwaechter
DISTRICT MANAGER
July 27, t990
Telecopy:
(907)276-7542
David L. MountJoy
Sr. Drilling Foreman
Conoco Inc.
3201 C Street, Suite 200
Anchorage, Alaska 99503
Milne Point Unit No. 1-2
Conoco Inc.
Permit No. 90-91
Sur. Loc. 2948'FNL, 3756'FEL, Sec. 33, T13N, R10E, UM.
Btmhote Loc. 1456'F~, 159'FEL, Sec. 33, T13N, R10E, UM.
Dear Mr. MountJ oy:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and
does not authorize conducting drilling operations until all other
required pe~itting determinations are made.
The Commission will advise you of those BOPE tests that it wishes
to witness.
Very truly yours,
Davi~d W. John~$on
Commissioner of
Alaska Oil and Gas Conservation Commission
BY ORDER OF THE CO~ISSION
dlf
Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
,,. .--,~ STATE OF ALASKA
ALASK OIL AND GAS CONSERVATION 5MMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill ,~. Redrill -'[ lb. Type of well. Exploratory ,~ Stratigraphic Test ~ Development Oil
Re-Entry _ DeepenEI Service '- Developement Gas ~ Single Zone~ Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
CONOCO INC. KB 35' AGL feet KUPARUK RIVER
3. Address 6. Property Designation
Pnuch 34OO4.~. Pf'udhoe Bay, AK 99734 ADL-25906 FIELD .
4. Location of well' at surface 7. Unit or property Name 11. Type Bond ~see 2o AAC 25.025)
2948 FNL, 3756' FEL, SEC. 33, T13N, R10E MILNE POINT UNIT BLANKET
At top of productive interval U,M,, NSB, AK 8. Well number Number
1680' FNL, 700' FEL, SEC. 33, T13N, RIOE I-2 8086-15-54
At total depth 9. Approximate spud date Amount
1456' FNL. 159' FEL, SEC. 33~ T13N~ RIOE OCTOBER 4~ 1990 $200,000
12. Distance to nearest I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth(MD and TVD)
property line
I
3600 'FSL feet! 60'F/I-1 ~ 500' feet 2560 6,58' MD, 4237' TVDf~et
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 500 feet Maximum hole angle 630 Maximum surface 1900 psig At total depth fTVD) 2000 psig
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing WeightlGradelCoup,inglLength MOI TVOl MD] TVD (include stago data)
'~n, 1~ ~t/~ /1~.~ IH_/t¢~l I,/l:'lrt I Rr~, ~R, I ~R, i 11R, I 11R, 4-4R.~ ..~K.~ PFRHAFRO.~T C
9 5/8 .4~ I;~-.4~1 RTRS 13~E' 35' i .~.~' l~-2-5-0' I 2500' +773 SKS PERMAFROST E
,+333 SKS.,,.CLASS G
10. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured) D0~NSQUEEZE
trUe vertical feet +_355 SKS PERMAFROST C
+60 BBLS DEAD CRUDE
Effective depth: measured feet Junk (measured)
true vertical feet
Length Size Cemented Measured depth True Vertical depth
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured
true vertical PIT SKETCH X
20. Attachments Filing fee ~ Property plat ~ BOP Sketch ~ Diverter Sketch X~. Drilling program ~_~
Drilling fluid program ;~ Time vs depth plot ;~ Refraction analysis [] Seabed report ~ 20 AAC 25.050 requirements
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
.. ~. ~ .-'¢ ...
, ~ ,~-2-;..,~-" SR DRILLING FOREMAN
Signed ..~ Title · Date
~ ~"-Commission Use Only
Permit Number APl number Approval date See cover letter
¢O -- ~/ 50- O ~ ?- ~ ~ (E' ~" 0 7 / 2 7 / 9 0 for other requirements i
Conditions of approval Samples required ~ Yes /,~ No Mud log required ~ Yes ~No
Hydrogen sulfide measures ~ Yes'~2M'~'N°; Directional survey required ~Yes ~ No
t
Required working pressure for BOPE ~ 3M; .~ 5M; [] 10M; [] 15M
Other:
~~' ' by order of
Approved Commissioner the commission Date ?,.
Form 10-401 Rev. 1~5 --'- ~ "' " Submit in triplicate
SUPPLEMENTAL DATA SHEET
APPLICATION FOR PERMIT TO DRILL
CONOCO MILNE POINT UNIT I-2
Conoco Inc.
P. O. Box 340045
Prudhoe Bay, Alaska 99734
I. Casing and Cementing Program
ae
The 13-3/8" conductor will be set at ±80' below the
surface, then cemented to the surface with ±485 sacks of
Permafrost Type "C".
Bo
The 9-5/8" surface casing will be cemented with ±773
sacks of Permafrost "E" cement followed by ±261 sacks of
Class "G" Cement. A top job will be done if cement is
not circulated to the surface.
Ce
The 7" production casing will be cemented in two stages.
The first stage will consist of ±129 sacks of Permafrost
"E" cement pumped around the casing shoe followed by ±333
sacks of Class "G" cement. The secondary cement job will
consist of ±355 sacks of Permafrost "C" cement followed
by ±60 barrels of Arctic Pack pumped down the 7"x 9-5/8"
annulus.
II. Drilling Fluid Program
ao
0' - 3250' 9.0 ppg freshwater spud mud.
B. 3250' - 5246' 9.2 ppg low solids non-dispersed.
C. 5246' - TD 9.4 low solids non-dispersed.
III. Drilling Program
Conoco Inc. proposes drilling the subject well as a production
well in the Kuparuk River Field (Upper Cretaceous-West Sac).
The mud system will be low solids, non-dispersed with a mud
weight in surface hole of 9.0 ppg. Mud weight at TD will be
9.4 ppg. A 20", 2000 psi diverter will be installed on the 13-
3/8" conductor for drilling surface hole. A 13-3/8", 5000 psi
RSRRA BOPE stack will be used on the surface casing. Pressure
tests will be performed as per State Regulations. BOP's,
choke manifold, upper and lower kelly safety valves will be
tested to 500 psig and 5000 psig, the Hydril to 350 psig and
3500 psig. Casing will be pressure tested to 1500 psig.
Maximum downhole pressure is based on initial reservoir
pressure. Maximum surface pressure is based on an unexpanded
gas bubble, temperature taken into account. The closest
wellbore is I-1 with a closure of 60 feet at a depth of 500'.
The well will not be completed or tested at this time.
ao
Drill a 30" conductor hole to ±80' and set 13-3/8"
conductor.
Be
Drill a 12-1/4" surface hole to ±2500' TVD 3250' MD and
set 9-5/8" casing.
Ce
Drill a 8-1/2" production hole to ±4237' TVD to 6158' MD
and set 7" casing.
TVD MD FORMATION BIT MUD WT YD PV VIS FL
0 0 Gravel 1-1-4 9.0 32 20 90 15
500 500 Sand/Clay 1-1-4 9.0 25 20 65 15
3289 4890 "K" Sand 1-1-4 9.2 25 15 35 10
3539 5246 "M" Sand 1-1-4 9.4 25 15 35 10
3755 5528 "N" Sand 1-1-4 9.4 25 12 35 05
3937 5766 "0" Sand 1-1-4 9.4 25 12 35 05
4237 6158 TD 1-1-4 9.4 25 12 35 05
*The proposed depth is an estimate only. If the actual depth
exceeds the permit depth by over 300 feet TVD, a Sundry Notice will
be submitted.
NOTES:
t STATE PLANE COORDINATES ARE ZONE 4
2, ALL GEODETIC POSITIONS ARE BASED ON
N.A.D, 1927
3. OI::I:SET$ TO SECTION LINES ARE COMPUTED
BASED ON PROTRACTED VALUE8 O1:: THE
SECTION CORNIER POSTION$
500'
i
., ~rGRAVEL ROAD
t
I -PAD
MILN~ POINT UNIT
~3WYDY~ BAY
MILNE PT, VICINITY MAP
o ~ ~
MILE8
LOC^TION IN
,SEC. 33, T13N, R1OE, UMIAT MERIDIAN
WELL I::ROM EAST LINE FROM NORTH LINE
1--1 3696' 29(~1'
I-2 $756' 2948'
1'"'8 3816' 2944'
I-4 3876' 2941'
,~TATE PLANE COOEDINATE3-ZONE 4
WELL Y X
I-1 6,009,444,70' 551,674`68'
I---2 6,009,447.40' 561,614.74'
1-3 6,009.460.10' ~8L5~4,81'
I-4 6,009,462.80' 55L494JlS'
~.~ ,~ l?o' _,_, lo' _GEODETIC PO$ITIO..NS NAD 1~27
~',L .' ...... [ 1 ~ I+ I-1 70'2611.67a7' "i49'~4;4~3.270""
~ I-4 70'25'11.~705' 149' 34'48.551'
'TYPICAL 3ECTIO~No ~CALE ~
"'J .... lmm _ mm -- [_mm m _ ~[ll,, -- . mm1 i ~ - -
~ATE OEO. ",,,, ,,,"
FIELD
sC,~L~ !',20rD' JOB t,;o, 87033
...... III ' ~ I ...... _ _ m_ _ mm . .
T13NRgE
CJ~c'~RON O
23 24
,M~L.-25514 2560 AC
T13N RIOE
CHEVRON ~ CONOCO ET Al. (~
6 4 0
·
0 .10
-
A.D~-25509 2533 JKC ADL"47434 2560 AC
v
( CHEVRON
18 17 16 18
2
11 T 12 ~
ADL-4T433 2 AC
13
30 29
24
2560 AC
CHEVRON
26 · 25
T13NR11E
ET AL ~)
CONOCO
6' 6
ADL-3197 1265 AC
CONOCO' ET AL
7
3 AC
CONOCO ET
q-
MILNE POINT UNIT
(D Denotee tract numbaro
Total Area In Unit 35,744 Ac
Mm,, Unit Boundary
ADL Lam ~
10
ADL-47438 2544
CONOCO.
30 29
31 3 03 34
A1~.-25517 ~2 KC~ADL-25~ 2560 AC
_2235 AC
__ / II,~ I I I IJ
CHEY.
AnCO
BP
IOHIO
~DL-25518
II I I III I
6/04
CONOCO ET AL
(D_
21 22
39 ADL-3 J5846
1280 AC .1280 AC
·
EXHIBIT A
MILNE POINT UNIT AREA
Bleed on Umlat Meridian,Alaska
o 1
MIlle I .... t
5call
CONOCO INC,--NABORS RIO 27E 13-5/8" 58888
Fill Line
API 13-,5/8' 5M
A~ 1~5~8'5M
F lo w Llne
Annular Preventor
Ram
R~m
Ram
A~ ~3-s~ ~ × u' ~ Tubing Spool
w/ 2"-5000~t
APl 11" 5H
Casing Spool
w/ 3"-5000~t
Tl~e~ded ComecHon 9-5/8"
C'hoke Line, 3" 5000~ Manual
& 3" HCR VALVE
Kill Line, Two 3" 5000~ Manual
Valves
Side Outlets
Side Outlets
Surf ace Casing
13-3/8" Conductor Casing
BOP
GaTe
SYSTEM
Valve
Gale
l, BOP STACK S]ZE RATING MEETS APl RP53 & SPEC 8A FOR CLASS 5H
2, BOPE TO BE OPERATED EACH TRlP AND TESTED W'EEKL'f,
3, BOP HYDRAULIC CONTROL SYSTEH TO INCLUDE (5) STAT]ON CONTROL
HAN]FOLD LOCATED REI"IOTE WITH 168 GALLON ACCUHULATOR, RESERVOIR
UNIT, & AUX]LIAR'f ENERGY SOURCE FOR SYSTEH ACT]VAT]ON,
4, MINIMUM ONE SET BLIND RAMS & TWO SETS APPROPRIATE PIPE RAMS,
5, CHOKE & KILL HANIFOLDS SHOWN SEPARATELY TO HEET API RP 53
CLASS 5H REOUZREHENTS,
KILL MANIFOLD
FROM REWROTE HIGH
PRESSURE PUMP --*"
~OT£:
!. N~ULI¢ CONTROL SYSTEI,I FOR 8~ ~C~ ~ CHO~
~N:FOLD TO ~NCLU~[ (5] STATI~ CONTROL MAN~FO~
L~TED REgOTELT ~JTX ~o PSI ~CCUUULATOR 8
1~0 ~. ~E~E~R 8 ~UX. E~ER~ SOURCE.
STA ~NTROL ~A~IF~ PLUS VARIABLE CHOKE
~NT~L TO BE ~CATE0 O~ RIG ELOOR.
Z K~L & CNG~ gAN~FOLDS ~ MEET A~ RPS] ~.
5e
~. KILL ~ANIF~D SIZE- RATING ~"- 5000
~ CHO~E ~ANIFO~ SIZE-RATING 3"-5~0
J FRON M, 2U~P
RE.~IOTE PRESSURE [;AGE SENSC~
HYDRt. ULIC CONTROLLED
REMOTE OPERATED
DRILLING SPOOL
REMOTE PRESSURE GAGE SENSOR
ADJUSTABLE
CHOKE
CHOKE
ADJUSTABLE I~ANIFOLD
CHOKE
-- VARIABLE
CHOKE
CONTROL
BLEED LINE
TO PIT
l
TO ATMOSPHERIC
MUD/GAS SEPARATOR
---,i. TO SHALE
SHAKER
CHOKE 8 KILL ~ANtFOLDS FOR 9s/8'~ & 7" OD C''
AS,NG BOP STACK
BOP I,IANIFOLD LAYOUT - CONOCO, INC.
,
C
C
CONOCO, INC.
IdlLN[ POINT UNIT
DIVERTER STACK FOR 13 ,318' CONDUCTOR
$,t V [ III '$U!
_
STARTI~O I~[AD
.. ?.. ': ': :. . ; ~ ~ .'
1. The hydraulic control syste~ will be in accordar~ze with API
specifications and A{~G43C requiremer~ts.
2. The HCR valve will open when the preventer closes. A single
I0" relief line will pun off of the drilling spool HCR valve
and will have a targeted downstream tee for downwind
diversion. Valves on both sides of the te~ will b~ full
opentn~] and linked together to enablQ one to always be open
and the. other to be closed.
:4
MuD CL£ANER
w~,T E.R ~
i
i
lak,~.t,~ 2
pul,~p 2
. o
FLOw SHEET
A. XELSEN INDUSTRIES LTD.
~b¥~LU~t'lbl~ I ~bLL
WELL NAME: MP.L~-~-2
15--Jan--90
CONDUCTOR SETTING DEPTH:
SURFACE CASING SETTING DEPTH:
INTERMEDIATE CASING SETTING DEPTH:
PRODUCTION CASING DEPTH (OR TD):
80
3233
0
6110
DEPTH OPERATION:
0 1 RIG MOVE:
0 2 RIG-UP; SET CONDUCTOR:
(3,233) 3 DRL/SURVEY SURFACE HOLE:
(3,~o~) 4 SURFACE HOLE LOGGING:
(3,233) 5 CONDI]'IONING TRIP:
(3,233) 6 RU/RUN SURFACE CASING:
(3,233) 7 RU/CEMENT SURFACE CASING:
(3,233) 8 CHNG BOPs; PU BHA; RIH:
(3,333) 9 DRL OUT; TEST; TOOH; RIH:
(3,333) 10 DRILL INTERMEDIATE HOLE:
CUM
HOUR DAYS DAYS
6 0.25 0.25
12 0.50 0.75
57 ~.° 39 3. 14
0 0.00 3.14
o 0.13 o.7 27
10 0 42 ~
. 0.69
6 0.25 3.94
9 0.38 4.33
10 0.41 4.74
0 0.00 4.74
(3,333) 11 LOGGING OPERATIONS: 0
(3,333) 12 CONDITIONING TRIP: 0
(3,333) 13 RU/RUN INTERMEDIATE CASING: 0
(3,333) 14 RU/CEMENT INTERMEDIATE CASING: 0
(3,333) 15 CHNG BOPs; PU BHA; RIH 0
(3~333) 16 DRL OUT; TEST; TOOH; RIH 0
(6,!10) 17 DRILL PRODUCTION HOLE: 64
(6,110) 18 CORING OPERATIONS: 0
(6~i10) 19 LOGGING OPERATIONS (MWD ONLY): 0
(6,110) '~' CONDITIONING TRIP: 10
(6,1i0) ~'i nU/RUN PRODUCTION CASING: 16
(6,110) ==°¢) RU/CEMENT PRODUCi'ION CASING: 6
(6,110) o]
~ RD DRLG RIG 12
(6,110) 24 RU COMPLETION RIG: 1~
(6,110) 25 RD DRLG RIG 12
(6~110) 26 RU COMPLETION RIG: 12
(6,110) 2Z RD DRLG RIG 12
(6~110) 28 RU COMPLETION RIG: 12
(6,110) 29 RD DRLG RIG 12
(6,i10) 30 RU COMPLETION RiG: 12
O. O0 4.74 -'
0. O0 4.74
O. O0 4.74
O. O0 4.74
0. O0 4.74
O. O0 4.74
~' 66 "~ 7 40
O. O0 7.40
(}. 00 7.40
0.42 7.82
0.65 8.47
0.25 8.73
0.50 9.23
· ..,d, 0.50
~----)
0..~t 1. O0
0.50 1.50
O. 50 2. O0
0 50 2
0.50 3.50
11:./
CONOCO, Inc.
Pad [, Well No, 2
Yll Ins Point Unit,
Revleecl Proposal
North SI ope, Al asea
0 . RKB ELEYAT[ON~ 3E'
KOP TVD=500 TMD=500 DEP=O MAXI MUM ANGLE
:~ 62 DEG 40 MI N
1000 _ ~, is '
21 BUILD 3 DE(3
-27 PER I00 Fl'
%'~55~EOB TVD 2197 TlqD 2589 DEP 1033
2OOO
' CSG PT Tva=2500 TlqD=3250 DEP=1620 ,
;3000_ BEGIN ANGLE DROP
6°54~ TVD=3070 TMD=4491 DEP=2723
DROP 3 DEG -'48 'Xx K SNDS TVD=3289 TMD=48=90 DEP=30=56
~i~' 160-~ 4.2 ~ TARGET / I`1 SNDS TVD 3539 TlqD 5246 DEP=3309
TARGET ANGLE
40 DEG
5000.,
I I I I
0 1000 2000 3000 4000
VERTICAL SECTION
HORIZONTAL
SCALE 1 IN.
PROJECTION
-- 1000 FEET
z
SURFACE LOCAITON~
2948' FNL. 3756' FEL
SEC, 33. T13N. RIOE
2OOO
1000
1000
CONOCO, Inc,
Pad I. Well No= 2
Mi lne Poln'l: Unit:.
Revised Proposal
North Slope. Alaska
1000 0
I
WEST-EAST
1000 2000 :3000
I ! I
SURFACE (
/ H SNDS
/ TVD-3$39
/ THD=5246
~./ DEP-3309
· NORTH 1268
EAST 3056
TARGET LOCATION,
1680' FNL. 700' FEL
SEC, :$3. TI3N. RIOE
TD LOCATION,
1436' FNL. 159' FEL
SEC, ::$3. T13N. RIOE
N 67 DEG 28 MI N E
3309' (TO TARGET)
:3950 :3900 :3850 :3800 :37'50 :37'00 ;3650 :3600 :3550
2800 _
2850 _
2900 _
2950 _
;3000 _
,7050 _
:3100 _
I ! t
/
/
/
/
/
~' 1100
/
/
/
/
/
? 900
/
/
)' 7'OO
· 500
500
~700
\
I ! I I I I
~900
\
\
\
', 1100
\
\
\
\
\
\
~°"~00
~'1
/ 100
I i I
:3950 3900 3850 3800 3750 3700 3650 3600 3550
_ 2800
285O
2900
2950
3000
3050
:3100
CHECK LIST FOR NEW WELL PERMITS
ITeM APPROVE DATE
----- (j thru 8)
(8)
(3) Admin /~'_ 7~F
'(f9 thru~'j)" '
(10 and 13)
(4) 7--ao- o
(14 thru 22)
(5) BOPE
(23 thru 28)
Company
Lease & Well No. NO
1. Is the permit fee at:ached ..........................................
e
3.
4.
5.
6.
7.
8.
e
10.
11.
12.
13.
14.
15.
Is well td be located in a defined pool .............................
Is well located proper dis:ante from property line ..................
Is well located proper distance from other wells ....................
Is sufficient undedicated acreage available in this pool ............
Is well to be deviated and is we!lbore plat included ................
Is operator the only affected parry .................................
Can permit be approved before fifteen-day wait ......................
YES
Does operator have a bond in force .................................. ~
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate ..................................... ~
Does the well have a unique name and number ......................... .
Is cdnductor string provided ........................................
Will surface casing protect all zones reasonably expected to
serve as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface amd intermediate or production strings ...
Will cement cover ail known productive horizons .....................
Will all casing give adequate safety in collapse, tension and burst..
Is :his well to be kicked off from an existing wellbore ............. __
Is old we!Ibore abandor~ment procedure included on 10-403 ............
Is adequate weilbore separation proposed ............................ "~
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate-~Z~f
Are necessary diagr~w~ and descriptions of diverter and BOPE attached.
Does BOPE have sufficient pressure rating - Test to ~m psig ..
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable ............................. ~...
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
~'oo/
thru
(6) Add: ,, .. 7-2o-?o
Geology: Engineering:
DWJ ~ LCS BEW
rev: 01/30/89
6.011.
Fo r
29.
30.
31.
32.
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
:/
Additional requirements ............................................. ~
Additional Remarks:'
INITIAL GEO. UNIT ON / OFF
POOL CLASS STATUS A/LEA NO. SHORE
/- o.'/ /cf
,,
__