Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
189-128
Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~¢--,/)~-'"' File Number of Well History File PAGES TO DELETE Complete RESCAN ~- ~~Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED -~/~s of various kinds J~' Other COMMENTS: Scanned by: Bevedy Bre~athan Lowell Isl. _~.,.~ TO RE-SCAN Notes: Re-Scanned by: Beverly Bren Vincent Nathan Lowell Date: Isl NOTScanned.wpd STATE Of ALASKA · ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 189-128 303-102 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21993-00 4. Location of well at surface 9. Unit or Lease Name 556' SNL, 1179' WEL, SEC. 21, T11N, R12E, UM X = 612049, Y = 5959701 Prudhoe Bay Unit At top of productive interval 2619' NSL, 170' WEL, SEC. 16, T11N, R12E, UM X = 613003, Y= 5962890 At total depth 10. Well Number 2759' NSL, 59' WEL, SEC. 16, T11N, R12E, UM X = 613112, Y = 5963032 W-23 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 90.6' ADL 028263 12. Date Spudded12/25/1989 113' Date T'D' Reached 114' Date comp'' susp'' or Aband'01/00/1990 4/25/2003 115' water depth' if °ffsh°reN/A MSL 116' NO' °f c°mpletionszero 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 10200 9203 FTI 10150 9161 FTI [] Yes [] NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run BHCS, CNL, DIFL, Borehole Profile 2:~. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 146' 13-3/8" 68# L-80 Surface 2678' 17-1/2" 3915 cu ft Coldset II 9-5/8" 47# NSCC Surface 9766' 12-1/4" 2018 cuft Class 'G' , 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 3-1/2", 9.2#, L-80 9730'- 10171' 9475' MD TVD MD TVD (Cut) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USErD 9721' Set EZSV with Whipstock on top / 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS'MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE co. r4 ¢'. F i'\,/P i"") Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit ~o~"~ip'"~. JUN 0 5 2003 No core samples were taken. ~;; Alaska 0il & Gas Cons. Commission Anchorage ;ANNED JUN 1 2, 2003 Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 9695' 8777' Shublik A 9734' 8809' Sadlerochit / Zone 4 9862' 8916' RECEIVED JUN 0 ~ 2003 Alaska 0il & Gas C~l~s. [;0remission Anch0rags 51. List of Affachments: Summa~ of Pre-Rig Work and Daily Drilling Repo~s 32. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~~ ~ Title Technical Assistant Date ~'0~'~ W-23 189-128 303-102 Prepared By Name/Numbec Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer' Nell Magee, 564-5119 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any a~achments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Ii EM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ORIGINAL Well: W-23A Accept: 04/19/03 Field: Prudhoe Bay Unit Spud: 04/27/03 APl: 50-029-21993-01 Release: 05/03/03 Permit: 203-056 Rig: Nabors 9ES Date PRE-RIG WORK 04/01/03 MILL TUBING OBSTRUCTION. MIRU COIL UNIT #5 W/15610' 1.75" COIL TBG. VOL = 34.4BBLS. 366K RUNNING FOOTAGE. MAKE UP MHA W/2.80" 5-BLADE CONCAVE JUNK MILL. RIH. TAG UP ON SSSV LANDING NIPPLE @ 2082'. POOH TO C/O MILLS. MAKE UP WEATHERFORD MHA W/2.73" 3-BLADE JUNK MILL. RIH. TAG TBG OBSTRUCTION @ 6992', MILL THROUGH, RIH MILL THROUGH OBSTRUCTION AT 9432'. GOT TO 9463' AND APPEARED TO MAKE -2' AT FIRST BUT STALLED OUT AT 9465'. POOH. 04102/03 POOH AFTER TRYING TO MILL THROUGH OBSTRUCTION AT 9465', (PACKER). HAD SPORADIC OVER PULLS OF 3000# TO 6000# UNTIL -8000' WHILE PULLING OUT OF HOLE. WENT IN THE HOLE WITH A 2.73" OD, CON-CAVED MILL, CAME OUT 2.43" OD & BULL-NOSED. IT APPEARS WE EXITED THE TUBING AT 7000' AND WERE MILLING IN THE 9 5/8" X 3 1/2" IA AT THE TOP OF THE PACKER. FREEZE PROTECT THE TUBING TO 2000' WITH 60/40 MEOH & THE FLOW LINE WITH 10 BBLS. RIG DOWN. 04/16/03 WELL KILL, CIRCULATED KILL INTO THE IA UPON EXPERIENCING HIGH BULLHEAD PRESSURES THEN BULLHEADED THE TUBING FOR THE FINAL KILL. PUMPED: 10 BBLS NEAT, 720 BBLS INHIBITED SEA WATER, 158 BBLS FLOW-PRO, 250 BBLS KCL, AND 150 BBLS DIESEL DOWN THE IA AND PUMPED 10 BBLS NEAT, 200 BBLS KCL, 30 BBLS FLOW-PRO, AND 25 BBLS DIESEL DOWN TUBING, ALSO PUMPED 10 BBLS NEAT AND 5 BBLS DIESEL TO FREEZE PROTECT FLOWLINE. 04/17/03 T/I/O=0/20/0 (POST KILL) MONITOR WHP'S. BP Page 1 ~ Operations Summary Report Legal Well Name: W-23A Common Well Name: W-23A Spud Date: 4/19/2003 Event Name: REENTER+COMPLETE Start: 4/19/2003 End: 5/3/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5~3~2003 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/19/2003 16:00 - 18:00 2.00 MOB P PRE Move sub off from W-207. Move down pad and spot rig over W-23 18:00 - 20:00 2.00 RIGU P PRE Spot pits, camp. 20:00 - 22:00 2.00 RIGU P PRE RU service lines; water, steam, electric. RU rig floor. Berm cellar and rig areas. Take on seawater. Rig Accepted @ 20:00 hrs. 22:00 -23:00 1.00 CLEAN P DECOMP Clean rig 23:00 - 00:00 1.00 WHSUR ~ DECOMP , RU surface lines to circulate out diesel and displace with clean seawater 4120/2003 00:00 - 02:30 2.50 RIGU = DECOMP Continue taking on clean seawater and RU to circulate out freeze protect. 02:30 - 03:30 1.00 RIGU = DECOMP Rig Service, top drive. CO bails, install elevators 03:30 - 04:30 1.00 WHSUR = DECOMP RU DSM, pull BPV through lubricator. Monitor well for 15 minutes - static 04:30 - 05:00 0.50 KILL = DECOMP PJSM with MI and all rig personnel on rigging up manifold and choke to circulate out freeze protect and pressure testing lines. 05:00 - 08:30 3.50 KILL P DECOMP Pressure test manifold and choke lines to 3000 psi. Reverse circulate 19 bbl diesel out of tbg. Pump 50 bbl soap down tbg with approximately 134 bbls diesel + seawater returns from annulus going to cuffings tank through flare line. Pump at 3.5 bpm, 230 psi until clean seawater to surface, 08:30 - 10:30 2.00 KILL P DECOMP Blow down secondary kill line. Line up returns to pits. circulate bottoms up at 5 bpm, 315 psi. 10:30 - 11:30 1.00 WHSUR P DECOMP Monitor well - static, blow down lines. Install TWC with FMC. 11:30 - 13:00 1.50 WHSUR !P DECOMP Bleed down adapter. ND tree and adapter flange 13:00 - 18:00 5.00 BOPSUF~ P DECOMP Break adapter flanges off BOP stack. MU mud cross. NU BOP and mud cross to tbg spool. 18:00 - 21:00 3.00 BOPSUF N SFAL DECOMP Attempt to test tbg hanger and TWC. Leak between tbg spool and mud cross. ND BOP, dress ring seal groove, replace APl ring seal. NU BOP on tbg spool. 21:00 - 00:00 3.00 BOPSUF P DECOMP Test hanger, TWC and new seal ring to 3500 psi - OK. Test BOPE, choke manifold and all related equip. 250 psi Iow and 3500 psi high for 5 minutes each. Witness of BOPE test waived by Jeff Jones, AOGCC. 4/21/2003 00:00 - 02:00 2.00 BOPSUF P DECOMP Continue test BOPE to 3500 psi high and 250 psi Iow for 5 minutes each. Blow down lines and RD test equipment 02:00 - 03:00 1.00 BOPSUR P DECOMP RU DSM and pull TWC through lubricator 03:00 - 03:30 0.50 PULL P DECOMP MU landing joint and pull tbg. Unseat tbg hanger and pull to rig floor, tbg pulled free at 90 Ubs up. 03:30 - 05:00 1.50 PULL P DECOMP Fill hole with 70 bbl clean seawater. Circulate clean seawater surface to surface, 8.5 bpm @ 513 psi. 8 bbl loss during circulation. 05:00 - 05:30 0.50 PULL P DECOMP Monitor well - static. RU tbg equipment. RU Camco unit to spool control lines. RD control lines from tbg hanger 05:30 - 09:00 3.50 PULL P DECOMP LD tbg hanger, 3 pup joints. Continue LD tbg while spooling SSSV control lines. Recovered all 34 clamps & 4 SS bands. SLM all tbg joints 09:00 - 09:30 0.50 PULL P DECOMP LD SSSV. RD Camco. Clear floor 09:30 - 15:30 6.00 PULL P DECOMP Continue LD 3-1/2" tbg & jewelry. Corrosion holes in joints #130-~142 and #211-~223. Recovered 223 joints + 16.80' of parted joint. Top of tbg stub calculated at 6985'. 15:30 - 16:00 0.50 PULL P DECOMP Clean and clear rig floor. RD tbg equipment. Printed: 5/5/2003 11:29:09 AM BP Page 2 ~ Operations Summa Report Legal Well Name: W-23A Common Well Name: W-23A Spud Date: 4/19/2003 Event Name: REENTER+COMPLETE Start: 4/19/2003 End: 5~3~2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5~3~2003 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/21/2003 16:00 - 16:30 0.50 WHSUR P DECOMP Install wear bushing - 8.75" ID 16:30 - 18:00 1.50 PULL P DECOMP PU 30 single joints of DP, stand back 10 stands. 18:00 - 20:00 2.00 PULL P DECOMP MU BHA #1 - shoe, tbg cutter, 3 joints of wash pipe, drive sub, bumper sub, 9 x 6 1/2" DC, 9 x 4" HWDP. 20:00 - 00:00 4.00 PULL : P DECOMP RIH with BHA #1to 2500', picking up DP. 95 klbs up, 85 klbs down. Drift DP to 2.5" Losses last 24 hrs. = 205 bbls Total losses = 205 bbls 4/22/2003 00:00 - 02:30 2.50 FISH P DECOMP Continue PU DP and RIH with tbg cutter to 6870'. Drift DP to 2.5". 02:30 - 03:30 1.00 FISH P DECOMP Continue RIH with stands from derrick to 6923'. Drift DP to 2.5". 03:30 - 04:45 1.25 FISH P DECOMP Wash down from 6923'. 150 gpm @ 54 psi. 165 klbs up, 144 klbs down, 156 klbs rotate. Engage top of fish at 6987'.. Wash over 101' of fish to 7088'. POH to 7073' and engage collar to make tbg cut. 04:45 - 06:30 1.75 FISH P DECOMP PU and engage mechanical tbg cutter @ 7065' per Baker Rep. 06:30 - 09:30 3.00 FISH P DECOMP Monitor well - static. Blow down top drive. POH to HWDP 09:30 - 10:00 0.50 FISH P DECOMP Stand back 3 stands HWDP and 3 stands DC 10:00 - 12:30 2.50 FISH P DECOMP LD bumper sub, drive sub, and 1 joint washpipe. Retrieve stub and 2 joints 3-1/2" tbg - total length 77.60'. LD remaining BHA 12:30 - 13:00 0.50 FISH P DECOMP Clear and clean rig floor. 13:00 - 16:00 3.00 FISH P DECOMP PU BHA #2 - overshot, bumper sub. RIH to 7065' 16:00 - 16:30 0.50 FISH P DECOMP Wash down and engage fish at 7065'. 145 klbs up, 125 klbs down, 135 klbs rotate. 200 gpm at 140 psi. Rotate over fish, ensure fish is in grapple. PU 45 klbs over string weight, set slips. 16:30 - 16:45 0.25 FISH P DECOMP PJSM with SWS and rig personnel. On MU and running string shot and chemical cutters. 16:45 - 19:00 2.25 FISH P DECOMP RU SWS. RIH with 2.5" blank perf gun, drift DP and 3-1/2" tbg to 9850' 19:00 - 19:30 0.50 FISH P DECOMP POH with 2.5" blank perf gun drift. 19:30 - 22:00 2.50 FISH P DECOMP LD 2.5" blank perf gun. MU string shot and RIH to 9850'. POH and correlate depth to tbg tally. Shoot string shot at 9740' 22:00 - 22:30 0.50 FISH I P DECOMP POH with string shot 22:30 - 00:00 1.50 FISHiP DECOMP LD string shot. MU chemical cutter and RIH. Losses last 24 hrs. = 227 bbls Total losses = 432 bbls 4/23/2003 00:00 - 01:00 1.00 FISH P DECOMP Continue RIH with chemical cutter on wireline to 9750'. 01:00 - 01:30 0.50 FISH P DECOMP Depth correlate chemical cutter #1 to tbg tally. Make chemical cut in 3-1/2" tbg at 9750'. 01:30 - 02:45 1.25 FISH P DECOMP POH with chemical cutter #1. 02:45 - 03:00 0.25 FISH P DECOMP PJSM with chemical 200' below surface. SWS and all rig personnel, no non-essential personnel on rig floor while picking up or laying down chemical cutters. 03:00 - 03:15 0.25 FISH P DECOMP LD chemical cutter #1 and clear rig floor of same. 03:15 - 04:45 1.50 FISH P DECOMP MU chemical cutter #2 and RIH on wireline 04:45 - 05:15 0.50 FISH P DECOMP Depth correlate chemical cutter #2 to tbg tally. Make chemical cut in 3-1/2" tbg at 9469'. 05:15 - 07:00 1.75 FISH P DECOMP POH with chemical cutter#2 07:00 - 08:30 1.50 FISH P DECOMP Pick up DP 10' to verify tbg cut, 165 klbs up. CBU @ 415 gpm, Printed: 515/2003 11:29:09 AM BP Page 3 ~ Operations Summa Report Legal Well Name: W-23A Common Well Name: W-23A Spud Date: 4/19/2003 Event Name: REENTER+COMPLETE Start: 4/19/2003 End: 5~3~2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5~3~2003 Rig Name: NABORS 9ES Rig Number: Date From-To Hours Task Code NPT Phase Description of Operations 4~23~2003 07:00 - 08:30 1.50 FISH 3 DECOMP 1170 psi. Monitor well - static, pump dry job, blow down top drive. 08:30 - 11:00 2.50 FISH 3 DECOMP POH with DP 11:00- 12:00 1.00 FISH ~ DECOMP LD BHA#2 12:00 - 12:30 0.50 PULL ~ DECOMP RU tbg eqipment to LD 3-1/2" tbg fish 12:30 - 14:30 2.00 PULL 3 DECOMP LD 3-1/2" tbg fish - 73 joints, 4 GLM's, 1 X-nipple 14:30 - 15:00 0.50 PULL :~ DECOMP Clear and clean rig floor 15:00 - 16:00 1.00 FISH :~ DECOMP MU BHA #3 - overshot, bumper sub, hydraulic jar and 9 DC's 16:00- 17:00 1.00 FISH P DECOMP RIH picking up DP from pipe shed 17:00 - 19:30 2.50 FISH P DECOMP Continue RIH with stands from derrick. 19:30 - 20:00 0.50 FISH P DECOMP Wash down. Engage fish at 9450', wash over 5' offish to ensure fish was engaged in overshot. Pull 10 klbs over rotating weight and make 8 turns to the right to unscrew the K-anchor. 200 klbs up, 155 klbs down, 180 klbs rotate. I 20:00 - 00:00 4.001 FISH . P DECOMP POH with k-anchor. 200 klbs up, 155 klbs down. Losses last 24 hrs. = 146 bbls Total losses = 578 bbls 4/24/2003 00:00 - 00:30 0.50 FISH P DECOMP LD fishing assembly and K-anchor. Fish shows a groove where coiled tubing milled down between the 9-5/8" csg and the K-anchor mandrel to the top of the packer. Possibly milling through the 9-5/8" casing. 00:30 - 01:00 0.50 FISH P DECOMP MU BHA #4 - packer milling assembly, and 3 stands of DC's 01:00 - 01:30 0.50 FISH P DECOMP PU 21 joints of 5" HWDP and RIH. Drift HWDP to 2.5" 01:30 - 05:00 3.50 FISH P DECOMP RIH with DP RU bleed tank and bleed 13-3/8" X 9-5/8" annulus pressure to 0 psi 05:00 - 06:30 1.50 FISH P DECOMP Cut and slip 90' of drilling line. Service top drive. 06:30 - 07:00 0.50 FISH P DECOMP Circulate at 300 gpm, 1576 psi. 220 klbs up, 178 klbs down, 200 klbs rotate, torque 4500 lbs. 07:00 - 11:00 4.00 FISH P DECOMP Mill packer asembly Tag up on packer at 9457', milled to 9460' 11:00 - 11:30 0.50 FISH P DECOMP Monitor well - static. Blow down choke, gas buster and top drive 11:30 - 15:00 3.50 PULL P DECOMP Pull packer and tbg tail. Pulled slow for the first 10 stands, to prevent swabbing. Pulling 15 to 20 klbs over original up weight through csg collars on first 10 stands. 15:00 - 15:30 0.50 PULL P DECOMP Stand back BHA ~ 15:30 - 16:00 0.50 PULL P DECOMP LD milling assembly and packer. 16:00 - 16:30 0.50 PULL P DECOMP Clean out junk baskets. CO elevators 16:30 - 17:00 0.50 PULL P DECOMP LD 7 joints 3-1/2" tbg, 2 X-nipples, 2 10' tbg pups 17:00 - 18:30 1.50 STWHIP P DECOMP MU BHA #5 - upper window mill and casing scraper 18:30 - 21:30 3.00 STWHIP P DECOMP RIH, tag tbg stump @ 9730' 21:30 - 23:00 1.50 STWHIP P DECOMP Circulate sweep surface to surface. 590 gpm, 2330 psi. 225 ~ klbs up, 170 klbs down, 200 klbs rotate, torque 5800 lbs @ 65 rpm. 23:00 - 00:00 1.00 STWHIP P DECOMP Monitor well - static. Pump dry job. TOH. 230 klbs up, 170 klbs down. Losses last 24 hrs. = 61 bbls Total losses = 639 bbls 4/25/2003 00:00 - 03:00 3.00 STWHIP P DECOMP POH with mill and casing scraper. Printed: 5/5/2003 11:29:09 AM BP Page 4 ~ Operations Summa Report Legal Well Name: W-23A Common Well Name: W-23A Spud Date: 4/19/2003 Event Name: REENTER+COMPLETE Start: 4/19/2003 End: 5~3~2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5~3~2003 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4~25~2003 03:00 - 03:30 0.50 STVVHIP P DECOMP Stand back HWDP and DC's 03:30 - 04:30 1.00~ STWHIP P DECOMP _D BHA #5. Clean out junk basket. Clean and clear rig floor ,04:30 - 04:45 0.25 STWHIP P DECOMP PJSM with SWS, HOWCO and all rig personnel on RU and running EZSV, and explosives safety. 04:45 - 05:30 0.75 STWHIP P DECOMP PU SWS BP setting tool and MU EZSV. 05:30 - 08:00 2.50 STWHIP P DECOMP RIH with EZ_,S.V~a¢ tbg stub at 9730' ELMD 08:00 - 08:30 0.50 S'DWHIP P DECOMP Depth c/¢~Yelate wi~eline to CNL/GR log of 01/08/1990. Set EZSVffat 9721'/Elf. MD 08:30 - 09:30 1.00 STWHIP P DECOMP POH ~_~,~eline. L_D setting tool. RD SWS. Clear floor 09:30 - 10:00 0.50 BOPSUF P DECOMP Pull weber b~shing. Flush BOP stack. 10:00 - 11:00 1.00 WHSUR P DECOMP Pressure test packoff anf 9-5/8 csg to 1000 psi for 5 minutes - OK. MU pack off running tool. Pull 9-5/8" packoff. 11:00 - 11:30 0.50 WHSUR P DECOMP PU up new 9-5/8" packoff, attempt to install - no go 11:30 - 16:00 4.50 BOPSU~ N SFAL DECOMP ND BOPE, inspect 9-5/8" csg hanger. Hanger not seated, 5-1/2" above load shoulder. Ran packoff with BOP racked back to visually inspect csg hanger and packoff position. Pull packoff and RD running tool. 0 psi on 13-3/8" X 9-5/8" annulus 16:00- 18:00 2.00 BOPSUI; N SFAL DECOMP NU BOPE and riser 18:00 - 19:30 1.50 WHSUR N SFAL DECOMP MU mule shoe. RIH with DC's and HWDP 19:30- 21:30 2.00 WHSUR N SFAL DECOMP RIH with DP to 5100' 21:30 - 23:00 1.50 WHSUR N SFAL DECOMP Circulate 350 bbls 33 degree water around to cool csg and reduce thermal expansion. 5 bpm, 150 psi 23:00 - 00:00 1.00 WHSUR N SFAL DECOMP MU R'I-rS. RIH I stand. Set RTTS, with ...127 klbs below to re-seat 9-5/8" csg hanger. POH with 1 stand, break down stinger 4/26/2003 00:00 - 01:30 1.50 WHSUR N SFAL DECOMP MU running tool and packoff. RIH seat packoff. RILDS. Test packoff to 5000 psi for 30 minutes - OK 01:30 - 03:00 1.50 WHSUR N SFAL DECOMP MU stand and RTTS stinger. Sting into RTTS, pump down DP and test casing below RTTS to 3000 psi for 5 minutes - OK Release R'I-rS and POH, LD same 03:00 - 04:00 1.00 CASE P DECOMP Fill lines close pipe rams. Test 9-5/8" csg & packoff to 3000 psi for 30 minutes - OK 04:00 - 07:30 3.50 STWHIP N SFAL DECOMP Blow down top drive and choke. POH to pick up whipstock 07:30- 08:00 0.50 STWHIP N SFAL DECOMP Stand back 5" HWDP and DC's 08:00 - 08:30 0.50' STWHIP P DECOMP Clean and clear rig floor. Install wear bushing and mouse hole 08:30 - 09:30 1.00' STWHIP P WEXlT MU whipstock, milling assembly and MWD. Orient MWD 09:30 - 10:00 0.50 STWHIP, P VVEXlT Rig service, top drive, blocks and crown 10:00 - 11:00 1.00 STWHIP: P WEXlT RIH with DC's and HWDP, 1-1/2 minute per stand 11:00 - 11:30 0.50 STWHIPi P WEXlT Shallow test MWD 11:30 - 16:00 4.50 STWHIP!P VVEXIT RIH with DP to 9614' MD @ 1-1/2 minute per stand, fill hole at 5700' MD 16:00 - 16:30 0.50 STWHIP P WEXlT Orient whipstock to 60 degrees right of high side. Tag EZSV at 9704' MD, EZSV set at 9721 ELMD'. Set down 20 klbs to set anchor, pick up and check anchor set - OK. Set down 45 klbs to shear off. 230 klbs up, 180 klbs down. 16:30 - 18:00 1.50 STWHIP P WEXIT Displace well wit~),8:'~"ppg FIo-Pro mud, 7 bpm, 1300 psi 18:00 - 00:00 6.00 STWHIP P WEXIT Mill window fro~ 968/1~ to 9703' MD. 450 gpm, 1880 psi. 230 klbs up, 180 klb~,deWn, 201 klbs rotate. 4/27/2003 00:00 - 02:30 2.50 STWHIP P VVEXIT Continue milling Window to 9709' MD. 450 gpm, 1880 psi. 230 klbs up, 180 klbs down, 201 klbs rotate. Approximately 100 lbs of metal recovered. 02:30 - 03:30 1.00 STWHIP P WEXIT Circulate hi-vis sweep surface to surface. 500 gpm, 1870 psi. Work mills through window while circulating. Printed: 515/2003 11:29:09 AM BP Page 5 Operations Summa Report Legal Well Name: W-23A Common Well Name: W-23A Spud Date: 4/19/2003 Event Name: REENTER+COMPLETE Start: 4/19/2003 End: 5~3~2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5~3~2003 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/27/2003 03:30 - 04:00 0.50 EVAL P WEXIT POH to top of window. Perform FIT to 10.0 EMW. 8.7 ppg mud at 8786' TVD = 600 psi pump pressure 04:00 - 08:00 4.00 STWHIP P WEXIT Monitor well - static. Pump dry job and POH 08:00 - 09:00 1.00 STWHIP P WEXIT LD 21 joints of 5" HWDP and 9 joints of 6-1/2" DC's 09:00 - 10:30 1.50 STWHIP, P WEXIT Break down milling assembly and clear rig floor 10:30 - 11:00 0.50 WHSUR P WEXIT Pull wear bushing and flush BOP stack 11:00 - 14:00 3.00 BOPSUF P WEXIT PU BOPE test equipment. Test BOPE to 250 psi Iow and 3500 psi high for 5 minutes each. Witness of BOP test waived by Chuck Scheeve, AOGCC 14:00 - 14:30 0.50 WHSUR P WEXIT Install wear bushing. RD BOP test equipment 14:30 - 16:30 2.00 DRILL P PROD1 MU BHA #7. Orient MWD, RIH with BHA and shallow test MWD 16:30 - 19:30 3.00 DRILL P PROD1 RIH with DP to 9115', fill every 30 stands 19:30 - 21:00 1.50 DRILL P PROD1 Cut and slip 92' of drilling line. Service top drive 21:00 - 22:00 1.00 DRILL P PROD1 RIH to 9675'. Log MWD up at 400 ft/hr to 9500' for geologic tie-in and correlation. 300 gpm, 1600 psi. Then orient 60 degrees right of hi,Ih side and exit window 22:00 - 00:00 2.00' DRILL P PROD1 Directional drill from 9709' to 9749', sliding 100%. Building ' angle at ~23 degrees per 100'. 300 gpm, 1880 psi. 193 klb~ 152 klbs down. 3-3/8" X 9-5/8" annulus pressure up to 1000 ps, jclSled down to 4/28/2003 00:00 - 16:45 16.75 DRILL P PROD1 Directional drill from 9749' to 10173', 10~%'sli~g, building angle at ~23 degrees per 100' throu,~uild section, final inclination at 10173' is 88.77 de~s at 105 degrees azimuth. 300 gpm, 1910 psi. 201~, 155 klbs down Sliding time last 24~r,~= 9.1 hrs. 0.25 Total sliding time~"10.1 hrs 16:45 - 17:00 DRILL P PROD1 Monitor well.~atic 17:00 - 17:30 0.50 DRILL P PROD1 POH~utting the motor at the botto~,Cof the windo~prns and pull out of the ' Uow to 9650'. Monitor well - static. 17:30 - 19:00 1.50 DRILL P PRODlJ CBU at 300 gpm, reciprocate DP while circulating 19:00 - 22:30 3.50 DRILL P PRO_~ Monitor well - static. Pump dry job and POH to the BHA 22:30 - 23:00 0.50 DRILL P P~A~D1 Stand back jars and DC's. Break out bit #1 and LD motor 23:00 - 00:00 1.00 DRILL P /~ROD1 PU up new motor and MU bit #2. Download and Orient MWD. 4/29/2003 00:00 - 01:00 1.00 DRILL PJ PROD1 Continue to download MWD. RIH with BHA and shallow test p/ MWD, 280 gpm and 840 psi 01:00 - 02:30 1.50 DRILL PROD1 RIH to 3988' with Bit #2, break circulation. 02:30 - 03:00 0.50~.DRILL. PROD1 Service top drive and blocks 03:00 ~ 05:00 2.00 DRIp" P PROD1 Continue RIH to 9586'. Break circulation at 7709'. At 9586' break circulation again and orient 60 degrees right of high side ,~ to exit window 05:00 ~ 06:00 DRILL I P PROD1 RIH through window and continue on to bottom pumping surveys as required by MWD. Wash last stand to bottom. No adverse hole conditions or fill. :06:00 18.00 DRILL P PROD1 Drill from 10,173 to 10,891 pumping 30 bbls. Hi-Vis. sweeps J every 200 to 300 ft. or as hole dictates. Backreaming every connection. ART==4 AST==7.33 Drilling with following parameters: WOB==5-10 UP WT==194K DWN==170K RT==170K TRQ==5,700 off bottom Printed: 5/5/2003 11:29:09 AM To: Winton Aubert - AOGCC Date: March 27, 2003 From: D. Neil Magee - BPXA GPB Rotary Drilling Subject: Reference: W-23 Application for Sundry Approval - Isolation for Sidetrack Operations APl # 50-029-21993-00 Approval is requested for the proposed well work of PBU well W-23 in preparation for a sidetrack (W-23A) of this well bore. Well W-23 was drilled and completed in January 1990. The well was completed with a series of sliding sleeves and CTC packers across the open hole interval, f The well initially produced 500 BOPD at 80% WC. A cement squeeze was performed on the well in March 1990 to isolate the lower 42P interval which was suspected of being the source of the produced water. The cement squeeze clogged up the open sliding sleeves above and the well was perforated through the tubing interval to restqre~"~ctivity in March and April of the same year. After a period of one year, production had fallen to~00' B~ Subsequent HCL stimulations were able to stabilize the well at approximately 600 BOPD. A ~~'performed on the well in 1997 with no increase in oil r..~tes. The production rate subsequently fell to 250 BOPD. The well is currently sanded back to 9900' and shut in due to well integrity issues. Currently the well appears to have a fish or perhaps collapsed tubing at 6976' and numerous holes in the completion tubing above the packer. (A video surveillance.r4:n'r was run to verify the tubing condition and to try and identify the fish.) Coil tubing operations are planned in late March to clean out the fish/ascertain if the tubing is collapsed. Based upon the poor tubing condition and added drainage by drilling a lateral through the existing completion interval (46P through 43P), the decision was made to pursue a sidetrack using a rotary rig. ~' The W-23A sidetrack is currently scheduled for Nabors Rig 0ES, beginning around 03. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application'f~F~Sundry is approved. Proposal We would like to propose relief from the usual requirement for cement isolation in the current wellbore ahead of sidetracking due to the following: · The lower portion of the original well, 42P sand and below, was squeeze cemented in 1990 to provide isolation from the original open hole below and to eliminate the potential water encroachment. · The sidetracked well-will-'bew~mpleted with a slotted liner across the same zones as the parent well and in v~'close~' y. . · The prospect-~E;FalltTcult cleanout to current well TD in light of a tubing fish and sand placement from TD to 9900'. ·The limited benefit of performing a cement squeeze in the current completion due to the questionable isolation provided by the CTC packers in the original completion. · The risks associated with squeeze cement interfering with subsequent tubing cuts due to the known and unknown holes in the current completion tubing. W-23 Application for Sundry Scope of Work Pre-Riq Work: 1. Pressure test/verify repairs to lower wellhead housing. 2. Pressure test the tubing and casing pack-offs to 5000 psi. 3. RU coil tubing. RIH with mill and attempt to mill/push tubing obstruction at 6976' to top of sand at approximately 9900'. 4. Liquid pack the tubing and IA. 5. String shot and chemical cut the 3~" tubing at __. 9,750' and in the upper three ft of the short joint at 9449' joint above the Otis HC packer at 9475'. 6. Circulate the well to seawater and shut-in after 1.25x complete circulation. Freeze protect the well to 2200' with diesel. 7. Pressure test hanger seals and 9-5/8" pack-offs to 5000 psi. Back out and run in all LDS. Set BPV. 8. Remove the well house. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ri.q Operations: 1. MIRU Nabors 9ES. 2. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 3½" tubing from above pro-rig cut. 5. Maker up overshot assembly and recover anchor from Otis HC packer. Mill over and recover packer from tubing cut at 9,750'. 6. MU window milling BHA and drift down through the BP setting depth. Set BP on E-line (set as needed to avoid cutting casing collar). 7. Test 9-5/8" casing to 3000 psi. 8. RIH with 9 5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock and set on BP. Mill window in 9 5/8" casing at ___9,720' MD. POH. 9. Kick-off and drill the 6-1/8" hole as per directional plan to an estimated TD of 11,228'. 10. Run a 4 ½", 12.6# L-80 production liner consisting of a combination of solid and slotted liner. Displace well to clean seawater above liner top. POH LD DP. 11. Run 4-1/2", 12.6# L-80 completion tying into the liner top. 12. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 13. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 14. Freeze protect the well to -2200' and secure the well. 15. Rig down and move off. Post-Ri.q Work: 1. MIRU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. Install gas lift valves. W-23 Application for Sundry Estimated Pm-rig Start Date: 03/29/03 Estimated Spud Date: 04/15/03 Neil Magee Operations Drilling Engineer 564-5119 W-23 Application for Sundry · ~ STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL ri. Type of Request: [] Abandon [] Alter Casing [] Change Approved Program [] Suspend [] Repair Well [] Operation Shutdown 2. Name of Operator BP Exploration (Alaska) Inc. :3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface 556' SNL, 1179' WEL, SEC. 21, T11N, R12E, UM At top of productive interval 2619' NSL, 170' WEL, SEC. 16, T11N, R12E, UM At effective depth 2738' NSL, 75' WEL, SEC. 16, T11N, R12E, UM At total depth 2759' NSL, 59' WEL, SEC. 16, T11N, R12E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical [] Plugging [] Time Extension [] Perforate [] Pull Tubing [] Variance [] Other [] Re-Enter Suspended Well [] Stimulate Casing 5. Type of well: ID! Development [] Exploratory [] Stratigraphic [] Service X = 612049, Y = 5959701 X = 613003, Y = 5962890 X = 613097, Y = 5963011 X = 613112, Y = 5963032 Sidetrack 10200 feet Plugs (measured) 9203 feet 10150 feet Junk (measured) 9161 feet 6. Datum Elevation (DF or KB) KBE = 90.6' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-23 9. Permit Number 189.128~'' 10. APl Number 50-029-21993-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Magna Range Bddge Plug at 10150'; Sand to about 9900' Length Size Cemented MD TVD Structural Conductor 146' 20" 146' 146' Surface 2678' 13-3/8" 3915 cu ft Coldset II 2678' 2673' Intermediate Production 9766' 9-5/8" 2018 cuft Class 'G' 9766' 8836' Liner Perforation depth: measured Open: 9850' - 9890', 9898' - 9917', 9928' - 9954', 9966' - 9996'; Open Hole: 10171' - 10200' Sqzd: 10020' - 10040' true vertical Open: 8906' - 8940', 8947' - 8963', 8972' - 8994', 9005' - 9030'; Open Hole: 9179' - 9203' Sqzd: 9050' - 9067' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 to 10171' Packers and SSSV (type and measured depth) 9-5/8" Otis 'HL' packer at 9475'; Extemal Casing Packers at 9859', 9918', 9952' and 9992' !3. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 4. Estimated date for commencing operation March 29, 2003 16. If proposal was verbally approved Name of approver Date Approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service contact Engineer Name/Number: Neil Magee, 564-5119 Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge '-~ !"~,,.~ " Title Senior Drilling Engineer Date ~,~/~. / 2.C-.,0 ~ Signed Bill Isaacson' . ~ _~.V"t ~ ~"'~"--'''[----' ' ' " "~"~*~' ~"~'"'" ..... I' "" ........ '[ ........... """" '" ":'""';''"' ":' "' "' ""' '"": " ......'" ""' ... ... ~,,,.,,~,~,:,....~......,,,..y.:..:,........?,~.: .. ...... ......,.~,.;:.,,,.. ....... .....~, .., ... ...... .,..... ,;....,.. :.~. .... ... ,,.. :.. .... ...',. '.... ' I ' ' i1 I" i1' i i I I _1 ....... ? I ^pprova, No- Conditions of Approval: Notify Commission so representative ma~y/~lvitness Plug integrity BOP Test _~_ Location clearance Mechanical Integrity Test 'Su~~ ~ ~ 1~ ~ Approved by order of the Commission Form10-403 Rev. 06/15/88 "[~[~MS , UKII INAL Commissioner Date .~/'~//~ APR I 2003 Submit In TdlSlica~ TREE 3" IVlCEV OY WELLHEAD = FMC ~,CTUATOR = BAKER ~i~:"~'~-; ........................... ~:4.'~~ (OP = 3300' ~'~'":~'~-~i~-: .............. :i~"'~"i~ii'i~'O'~' Datum MD = 9832' Datum 'I'VD = 8800' SS J 13-3/8" CSG, 72#, L-80, ID = 12.347" Jd 2678' W-23 SAFr K)TES: TBG LEAK IN PUP JOINT BELOW #1. HOLb,.d 6892', 6937', 6939', 6985', & 6999'. OBSTRUCTION ~ 6976' SLM. Hole in tubing at 9448'.Well sanded back to 9900'. Well currently shut in due to integrity issues. J 2099' J--J3-112"OTISSSSV LAND. NIP, ID=2.75" J GAS LIFT MANDRELS JMinimum ID = 2.635" ~ 10162' J 3-112" OTIS XN NIPPLE J 9-5/8" CSG, 47#, L-80, ID = 8.681" bJ 9766' 9469' J--J 3-1/2" OTIS X NIP, ID = 2.750" J 9475' J---Jg-5/8" X 3-1/2" OTIS HL PKP,, ID= 3.850" J 9522' J-J 3-1/2" OTIS X NIP, ID = 2.750" J 9542' J--J 3-1/2" OTIS X NIP, ID = 2.750" J J 20' CTC PKR J--J 9859' PERFORATION SUMMARY RE]= LOG: BHC/GR ON 01/08/90 ANGLEATTOP PEP, F: 33 @ 9850' Note: Refer to Production DB for historical perf data SIZE SPF I~VAL Opn/Sqz DATE 2-1/2", 8 9850- 9890 O 09/01/97 2" 4 9898 - 9917 O 04/01/90 2" 4 9928 - 9954 O 03/26/90 2" 4 9966- 9996 O 03/21/90 2-1/2" 4 10020- 10040 S 03/08/90 J 9885' J 9905' 9907' 9943' FJ3-1/2" OTIS XD SLIDING SLEEVE, ID = 2.750" J--J3-1/2" OTIS XD SLIDING SLEEVE, ID: 2.750" J ~13-1/2" OTIS XD SLIDING SLEEVE, ID: 2.750" J 20' CTC PKR J--J 9918' J 20' CTC PKR 9952' J 9977' J-J3-1/2" on XD SLIDING SLEEVE, ID: 2.750" J J 40' CTC PKR bJ 9992' 10171' J 8-1/2" OPEN HOLE J--J 10200' 110150' RANGEBP I I 10162' H 3-1/2"OTmSXNNIP, ID:2.635") 10171' H5-i/2,, TNV DUEL VALVE SHOE J' DATE REV BY COMMENTS DATE REV BY COMMENTS 01111/90 DR ORIGINAL COMPLETION 03/05/01 SIS-LG FINAL 11/02/01 RN/TP CORRECTIONS 12/11/02 JDM/KK OBSTRUCTION SAFETY NOTE 02/18/03 PJP/tlh HOLES IN LNR SAFETY NOTE PRUDHOE BAY UNIT WELL: W-23 PERMIT No: 1891280 1:~I-3=,MIT No: 50-029-21993-00 SEC 21, T11N, R12E, 556' FSL & 1179' FEL BP Exploration (Alaska) TREE -' 3" MCEVOY WELLHEAD = FMC '~,-~Y~Si~-; ................... ~-~ 'i~i~:"~";' ............................ ~'i~,'6'~ KOP = 3300' "i~'-A:'~'~i~'"; .............. '~i'~'"~'"i~'~i~'i~~' :)atum MD = 9832' Datum TVD = 8800' SS 2678' ~ 9-5/8" CSG, 47#, L-80, ID = 8.681" bi 9766' 20' CTC PKR ~"'1 9859' PERFORATION SUMMARY REF LOG: BHC/GR ON 01/08/90 ANGLEATTOP PEP, F: 33 @ 9850' Note: Refer to Production DB for historical perf data SIZE SPF INTB~VAL OpnlSqz DATE 2-1/2" 8 9850- 9890 O 09/01/97 2" 4 9898- 9917 O 04/01/90 2" 4 9928 - 9954 O 03/26/90 2" 4 9966 - 9996 O 03121/90 2-112" 4 10020 - 10040 S 03108/90 20' CTC PKR J'-I 9918' I-L 9952' 40' crc PKR ~1 9992' 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" bL 10171' 18-1/2" OPEN HOLE bL 10200' W-23 Decomplete '-----" ,/' Bridge Plug set at +/-9700' MD 9885' H3-1/2,, OTIS XD SLIDING SLEEVE, ID = 2.750" 9905' pI 31/2" OTlS XD SLIDING SLEEVE, ID=2.750" I I 9907' pITOPOFSANDBACK J I 9977' pi 3-1/2" OTIS XD SLIDING SLI--;'-VE, ID = 2.750" I I 10150' pIMAGNA RANGEBP I I o s2' I-I 10171' pi5-1/2" TIW DUEL VALVE SHOE COMMENTS Proposed Suspension COMMENTS PRUDHOE BAY uNrr WELL: W-23 PB:~VlIT No: 1891280 PERMIT No: 50-029-21993-00 SEC21, TllN, R12E, 556' FSL & 1179' FEL BP Exploration (Alas ka) O bp To: From: Subject: Winton Aubert (AOGCC) Nell Magee Operations Drilling Engineer W-23 Pre-Rig Work Date: March 19, 2003 I want to review our plans for the pre-rig work on W-23 to prepare it for an upcoming sidetrack ahead of the Sundry application. I've attached a current and planned schematic of the well as well as a geologic cross section for your review. Discussion: The sidetrack well will be completed with a slotted liner cross cuffing the Zone 4B (46,45,44 and 43 sands). The well will be kicked off with 20 degree doglegs just below the Sag river landing _in the 44 sand inverting at the 46 sand and TD'ing in the 43 or 42 sand depending on the OWC. The slotted liner completion will cover all sands currently open in the original completion with the exception of the 42 sand. The top sand will be cut when the sidetracked well is some 40' away from the parent well and the lower 43/42 sand will be cut when the sidetracked well is approximately 1200' from the parent well. From a reservoir cross flow perspective, further isolation of the original wellbore is not a requirement. The original completion was squeezed below 10,020' to shut off potential water encroachment from the open hole completion below. The completion was sanded back to 9900' as part of an unsuccessful frec job performed in 1997. The well is able to produce from the top perforation interval at 9850-9890'. There is an unknown fish in the tubing at 6976', which will have to be milled out or pushed to bottom ahead of the tubing cuts required to de-complete the well. This fish may prove problematic to remove and if we are successful in pushing the obstruction down to the top of sand at 9900', may prevent further clean out progress. The pre-rig entails a tubing cut at 9750' to allow for setting a whipstock. Well Status: The well is currently shut in. The wellhead was reported to be leaking at two small areas between the lower wellhead housing and the 13-3/8" casing. Well Integrity Engineers have been asked to inspect wellhead and make appropriate welding repairs prior to the rig mobilization. A video surveillance was run on the well 12/10/03 to determine the nature of the obstruction in the tubing at approximately 6976' (SLM). The obstruction appears to be metal debris laying over in the tubing at that depth. A bailer run was run without recovery. Tubing leaks have been identified at 6892', 6937', 6939', 6985', 6999' and 9448'. The pre-rig entails verifying the wellhead/13-3/8" casing leak has been corrected, in conjunction with safe out of the well for wellhead repair, performing a clean out run with coil, testing the wellhead pack-offs and performing tubing cuts. proposal We would like to propose relief from the usual requirement for cement isolation in the current wellbore ahead of sidetracking due to the following: · The lower portion of the original well, 42P sand and below, was squeeze cemented in 1990 to provide isolation from the original open hole below and to eliminate the potential water encroachment. · The sidetracked well Wi~i'~e completed with a slotted liner across the same zones as the parent well and in very close proximity. The prospect of a difficult cleanout to current well TD in light of a tubing fish and sand placement from TD to 9900'. · The limited benefit of performing a cement squeeze in the current completion due to the questionable isolation provided by the CTC packers in the original completion. · The risks associated with squeeze cement interfering with subsequent tubing cuts due to the known and unknown holes in the current completion tubing. I'm available to discuss this with you at your convenience and will contact you prior to any proposed pre-rig work ahead of the W-23a sidetrack. Regards, Neil Magee Operations Drilling Engineer Office: 564-5119 Cell: 240-8038 attach. f~EE -- 3" MC~rZVOY SAFETY NOTE~: TBG LEAK IN PLI~ JOINT BELOW I1. WELLHEAD: FMC W 23 HOLES, 6,2'. 6937'. 6~39'. 698S'. & 6999'. A CTUA TOl~ :~AhFR m OBSTRUCTION O 6976' SLM. Hole In tubing KB. ELEV: g0.61' g448'.Well eanded beck to 99~0'. Well currently shut in Bi: E] E'¥ ~ 5,t ,:6' ~ due to Integrity Iseues. KOP -: 3300' MF,~ Angle = 37 ~ a8C,0: Dat,m Iv10 = 9832' O ~112' OT,S $SSV LAND. N,P. ID = 275"I ....................... Datum TVD: 88~0' SS GAS LIFT MANERFI S 104116/95 2 ~34 ?§84 37 OTIS DV RA 04,18,96 1 9440 8477 35 OTiS SO RA 20 j04118198 IMinimum ID = 2.635" ~ 10162'I ; 3-1/2" OTIS XN NIPPLE .. [ 20'CTCF~':R]'-[~-~--~']'~"~ 3-1/2"OTIS XDSLIDING SLEEVE. ,D= 2750' ~mFORAT~O~ SUMMARY '~' ~ LOG BIICJGR ON 01108190 / ~ ANGLE AT TOPPE~F-' 33 ~_. 9850' Note Refer lo I~oductm, DB lo~ [qi$1orlcal perf data 3.112" OTIS XD SLIDING SLE~IE. I;D: 2.750" SiZE SPF II'g'ERV A L OpnlSqz DATE 2-1/2" i:] "l.g50 - 9.~90 O 09,01,97 2' 4 9~9~J' 99179954 Co C3126,9004!01'90J~ /~~ .'t' 4 9q?..3. .~.,.~.. ;~ lOO.~o. ~004o ~ o-~;o8,9o L 3-tl2" OTIS XD SLIDING SLE~"VE ~D = 2750" L20' CTC FAR CMT,~~.. TIW DUEL VALVE SHOE~ lr¥' TIW DUEL VALVE SHOE ] DATE RE~! BY OOMMEHI'$ DATE REV BY COlvT,/IENTS mL.O-IOEBAY UNIT 01111190 Dgt ORIGINAL COMJ:~tETIOH WELL: W-~) 0310bi01 SIS-LG:IHAL PERIVIT No' 1891980 11102101 RNFrP CORRECTIO£,IS PE~MT No. 50-029-21993-00 121~110~ J~WI<KOBSTF'.dJCTIOI'i.~.ArE'rY NOJE SEC21, TllU, R12E, 55('FSL& ll?g'FEL 02118103 P, lP/tlh HOLESIN LN~ SAFEIY NOtE ~P J~j~lJl'lJlJn JAJllklJ FERFORATIOt~ SUMMARY EEF LOG BIIOGR ON 01/08190 ANGLE AT TOPPE~F-' 33 ~_. 9850' Note Refer to I~oductmn DB lo~ [qi$1oncal perf data S!ZE SPF II'g'ERV A LOpnlSqz DATE 1i2" i~ ,'l.g5O - 9-390 O 09/01197 2' 4 gY~g~ - ggl7O 04!01190 2' 4 9q78- 9954 0 C3!26190 2' ,1 9906 - ggg6 0 03!21190 2-112" 4 10,.,120- 10040 S 03/08190 . ~REE -'- 3' MCL¥OY WELLHEAD = FMC A~,~d~-~.-_~- ...... ~.~.~ W-23 Decomplete ~B ~.~/ = ~0 ~1' KOP = 3300' Max A~gle ~ S7 ~ ~8C0' Ca:urn ~D ~ ~832' I '33/a"CSG. 7~.L-S0, tD='~.347"H 2678' ~ [ Bridge Plug set at +/-9700' MD I 9-5~8"C$G Z/#,L-60,1D=8801" I"'1 eZ66' ~ · .~-,,~.. o~s :<~ SL=~,o ~. ,o: ~ ~5o" ~FORATION SUMMA RY ~ LOG BI[OG~ ON 01108190 ANGLE AT TOP ~F: 33 ~ 9~50' Note Refer to R~ductmn ~ for histonce~ pert data ~ ~' ~1~ 112" O~S XD ~I~NG ~E, ID = Z750" S~E S~ I~VAL OpnlS~I DATE ~.112" 8 9850- 9890 0 I 09101197 i . 9986- g~g8 0 i 0~21/90 / 3-1/2" O~S ~ ~IDMO ~E ID= 2750" ~'~':"I 4 ~o~o. ~o~o s ~ o~/o~/~o ??: ~0~62" I 3.1~2' Om m ~P, ID= 2635' :MT...~ ~ ~ DATE R~ BY CO~S DATE R~ BY CO~TS ~OEBAY UNiT ~311~03 NM Roposed Suspensmn ~L' W-23 -- ~ 1891280 ~MT P~: 50-02~2199~00 SEC ~1. TllN, ~ ~leratlen (Allmkm) PERFORATION SUMMARY ~ LO(; B~IC/GI~ ON 01108190 ANGLE AT TOP I:~;~F: 33 @ 9850' Note Refer to R'c, duct~on DB for historical pert data SIZE SPF iNTERVAL OpnlSc~z DATE 2-112" 8 9850- 9890 O 09/01197 2" 4 9698- 9917 0 04/01190 2" 4 9928 - 9954 0 03126190 2" 4 9966 - 9,998 0 03~21193 2-112" 4 1d020 - 10040 S 03108190 x Angle -- I Datum TVD = W-23a Sidetrack 2000' H 4-1/2. HES X NIP, ID = 3.813" 13-3/8" CSG, 72#, L-80, ID = 12.347" J--J 2678' 9-5/8"X 4-1/2" Baker SABL Packer 4-1/2" 'X' Landing Nipple with 3.813" seal bore. ~ 4-1/2" 'X' Landing Nipple with 3.813" seal bore. ~ 4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. Tie Back Sleeve ZXP Liner Top Packer BAKER 7" x 9-5/8" HMC Liner Hanger 4-1/2" 12.6# 13Cr-80 Vam Ace with GLM's GAS LIFT MANDRELS ST MD TVD DEV TYPE i VLV LATCH PORT DATE 6 KBG-2 RK 5 KBG-2 RK 4 KBG-2 RK 3 KBG-2 INT 2 KBG-2 INT I KBG-2 INT Window Milled from Whipstock Top of Window at +/-9720' MD Bridge Plug set at +/-9740' MD 9-5/8" CSG, 47#, L-80, ID = 8.681" J--J 9766' -,) J TD 11428' J--.J4-1/2" 12.6# L-80 Slotted/Solid Liner 20' CTC PKR ~J 9859' PERFORATION SUMMARY REF LOG: BHC/GR ON 01/08/90 ANGLE AT TOP PEP, F: 33 @ 9850' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 2-1/2" 8 9850- 9890 O 09101197 2" 4 9898- 9917 O 04101~90 2" 4 9928 - 9954 O 03126/90 2" 4 9966- 9996 O 03/21/90 2-1/2" 4 10020 - 10040 S 03~08~90 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" I--J 10171' I lo15o, RANGEBP I 18'I/2''°PENH°LE H 10200' DATE REV BY COMMENTS DATE REV BY COMMENTS 03118103 NM Proposed Sidetrack PRUDHOE BAY UNIT WELL: W-23A PERMIT No: PERMIT No: 50-XXX-00 SEC 21, T11N, R12E, 556' FSL & 1179' FEL BP Exploration (Alaska) 1114 W-23A wp3 RST Predrill Cross-section ---8600 -8650 -8650 -8700 -87OO ~8750 -8750 -8800 -8800 -8850 -8850 -8900 -8900 -8950 -8950 0 500 1000 1500 -9000 -8600- Conformance Cross-=section between W-23A and W-24i ~,~ 23 -86 -8650. -8700~ -86 -87 -8750. -87 -8800. -88 -8850 -88 -8'900 -8'9 28950 -8'9 -9000 -9O Current Well Status Well History/Current Status: W-23 is a monobore 3.5" tubing completion from surface to TD drilled in 1/90. The well is completed with a series of sliding sleeves and CTC packers and came on at 500 BOPD and 80% water. A cement squeeze WSO of the well in 3/90 clogged up all the sliding sleeves. Perforations through the sliding sleeves were added after the cement squeeze to restore productivity to 500 BOPD at lower watercut. W-23 quickly declined to 100 BOPD and an HCL stim of the perfs in 1/91 increased production to 1000 BOPD. A second HCL treatment in early 1992, kept the well producing at 600 BOPD. A frac in 1997, screened out and did nothing to improve oil rates. Since 1999, W-23 has declined to 250 BOPD. With the frac'd sliding sleeve completion, there are no further wellwork options to stimulate this well. Currently, W-23 is sanded back to 9900' MD and is shut-in due to integrity issues.- W-23 Integrity issues as follows: 07/12/97: Hole in tubing @ 9448' Pup joint at GLM #1. HES patch run for frac job 11/18/97: Patch pulled for CTU C/O - hole in tubing remains open 10/11/02: PPPOT-T Failed, could not get void to build any pressure, PPPOT-IC packed off. 10/17/02: MIT-OA to 2400 psi- Passed 10/18/02: TIFL failed, NFT failed 11/15/02: Drift sat down at 6976', metal marks on LIB 12/08/02: Pad Op called in small leaks on existing bradenhead weld 12/11/02: Video showed metal debris laying over in tbg @ 7001' (6976' SLM), not collapsed pipe and holes in tbg @6892', 6937', 6939', 6985', 6999' and possible additional . shallow holes ~,~=. ~.,~jl~_ ~,~;,.~'~..~r'~-. .~.'"-~" ~.,,-~-.~ S:\GPB~Well Files\W\W-23A\Planning~W-23A Tcch Package\W-23A Rig Technical package.doc 20-Mar-03 Page 5 of 20 Geoscience Target Location The proposed W-23A coil sidetrack is a Zone 4 Periphery Wedge play located in the northeast corner of W-Pad. It is analogous and in close proximity to well W-21A. It will provide the bulk of the northern offtake for the W-24i injector, which is planned to begin injecting water in 4Q03. Figure I TSAD Depth structure Map showing location of the proposed W-23A coil sidetrack well in pinR. In cross-section (Figure 2) the well has the following objectives (in the order they will be encountered along the well trajectory: 1. Kick off in the Sag River Sand S:~GPB\Well Files\W~W-23A\Planning\W-23A Tech Package'~W-23A Rig Technical package.doc 20-Mar-03 Page 6 of 20 2. Swing to the southeast to parallel strike, land in the 44P, above the expected POWC. 3. Climb up to approx 10' below projected TSad, cross-cutting the 44, 45 and 46P sands. Get as high as possible without compromising weight-on-bit and the ability to turn down at toe to tag the POWC away from the parent well 4. When 80' MD minimum oil-bearing reservoir is exposed, consider turning down to confirm the POWC 5. If the POWC is encountered higher than expected, drill 15 vertical feet below logged contact & TD the well 6. TD criteria = 15 vertical feet below logged contact. W-23A wp3 RST Predrill CrosS-section -860{ .......................... 8600 -8650 -8650 -8700 ............................................................. 8700 -8750 -8750 -8800 -8800 -8850 ........... '"'" ..... ' ...... -8850 -8900 -8900 -8950 Zl2P -8950 W.23A 588 -900O 0 1000 ~500 Figure 2 Predrill Cross-section for well W-23A showing proposed well path, original gas/oil contact (OGOC), present oil/water contact (POWC expected and high cases), and original oil/water contact (OWC) S:\GPB\Well Files~V~W-23A~Planning~W-23A Tech Package\W-23A Rig Technical package.doc 20-Mar-03 Page 7 of 20 Conformance We expect conformance between the injector and W-23A to be good along the entire horizontal length of the well bore, Figure 3 is a north-south trending cross-section between the W-24i injector and the proposed well bore at the heel (near the parent well). The proposed well will have perforations in the 46 and 45P sands at the heel and from the 46 to 42P sands at the toe, The distance between the injector and the producer is approximately 1800 feet. Conformance Cross-section between W-23A and W-241 -8600 -8650 -8650 -8700 -8700 -8750 -8750 -8800 -8800 -8850 -8850 -8900 -8900 -8950 -8950 -9000 O~lds: JWL_022403 C; Tones 92-24-03 Figure 3. Cross-section showing the relationship between the proposed W-23A well and the MI injector W24i. Reservoir Quality Based on the standard suite of data (Neutron-porosity logs, descriptions, etc) reservoir quality in fair to good in the offset wells. gamma-ray, cuttings -9000 S:\GPB~Wcll Filcs~V~W-23A\Planning\W-23A Tech Package\W-23A Rig Technical package, doc 20-Mar-03 Page 8 of 20 Fluid Summary The present gross light oil column (GLOC) is bounded by TSad on top and water influx from below due to natural water drive. The present oil-water contact (POWC) is inferred from well water cuts with the addition of one good recent control point to the east in well W-21A. There is a Iow chance of having some gas under-runs (UR) below TSad and the 45N Shale. We have three estimates of the Gross Light Oil Column based on three potential fluid scenarios. Low Case -8825 Expected Case -8825 High Case -8825 86' 115' The expected case (Figure 2) honors the existing log data and assumes a tabular rise in water with no coning of water near existing production. It is a somewhat conservative estimate, as recent drilling has indicated that the influx water level is highest near existing production The Low Case is similar to the expected case but has subtracted 10' from the Gross light Oil column for possible gas under-runs. The Hiqh Case assumes that the POWC approaches original levels away from existing offtake and that the well data represent coning of water near the well bore. Structure: The proposed W-23A well is located north-northwest of W Pad in the Main Fault Block shown on the attached Top Sadlerochit structure map (Fig. 1) and seismic continuity map (Fig. 4). S:~GPB\Well Files\W~W-23A\Planning\W-23A Tech Package~W-23A Rig Technical package.doc 20-Mar-03 Page 9 of 20 Figure 4. Top Sadlerochit seismic continuity map. The target polygon is shown in yellow and red lines (hard-lines) Faulting: Overall the lost cimulation risk is considered Iow (20-40% chance for some losses). While both the W-21A and W-32A wells had significant losses, the majority of these losses are interpreted to be associated with fault crossings. No fault crossings are expected in the W- 23A well. Them is one region near the heel of the well that may be a southern extension of a small fault, but there is no seismic evidence for this fault, apart from a small change in the stratigmphic dip. S:~GPB~Well Files\W~W-23A\Planning\W-23A Tech Package~W-23A Rig Technical package.doc 20-Mar-03 Page 10 of 20 Figure 5. Seismic section along the proposed well bore showing prognosed faults (rna.3dv time reflection data). Tar_oet Polygon Two sides of the target polygon are hard lines (Fig. 4). The northern side of the target polygon is a hard-line to maintain standoff from a small 5' fault, to the north. The southeastern side of the target polygon is a hard-line to maintain 400 ft. standoff from perforations in W-21A. As shown in Fig. 4, no major faults are mapped between W-23A and W-24i. Significant impact on sweep efficiency is not expected. S:\GPB\Well Files\W~W-23A\Planning\W-23A Tech Package\W-23A Rig Technical package, doc 20-Mar-03 Page 11 of 20 03/07~2003 Velocity Model Figure 6. Average velocity map to Top Sadlerochit. Seismic Quality Seismic quality (Hurl-West end survey) is moderate to good (Fig. 5). The seismic velocity gradients, while generally smooth, do not have a large amount of well control to the Northeast. The W-23A well is located in an area of changing velocity (Fig 6), and will be going from a zone of lower to higher velocity. Formation depths are expected to be close to estimation near the kickoff point. However, due to uncertainty in the velocity gradient, depths are estimated to be within +/-30 feet of prognosis away from the two existing control points (W-23 and W-21A). S:\GPB~Well Files\W~W-23A\Planning\W-23A Tech Package\W-23A Rig Technical package.doc 20-Mar-03 Page 12 of 20 Reservoir Benefits Volumetric OIIP and Reserves W-23A is planned on the Northern flank of the main fault-block as a pattern improvement well for the W-24i MI injection pattern. Currently the parent well is shut-in due to tubing collapse. The parent well has a small remaining value that requires a tubing change-out to be realized. This is an alternative case to sidetracking the well. The relevant drainage patterns and MI sectors are shown in Figure 7. The target length of the lateral is 1330 feet with an 900 foot effective reservoir section. It is assumed that 400 feet will be non- contributing (shales, high Sw, or blanked off faults). W-23A is one of four production wells in the W-24i MI injection pattern (Figure 7); the other wells are W-18, W-22 and W-32A. The heel of W-21A may also receive some benefit from W-24i. Volumetric estimates are summarized in Table 1. For primary recovery, W-23A will drain 226 acres containing 8.444 MMSTB OIIP. Presently, 24% of OIIP in this drainage area has been produced (2.00 MMSTB) by W-23. Drilling the proposed W-23A-is- expected to raise primary recovery to 37%, yielding 1.129 MMBO SLP. Table 1. Summary of O01P and reserves PrOduced Ult. Primary WF & MI OIP Acres (SLP) (SLP) recovery MMSTB MMSTB RF MMSTB RF MMSTB RF W-23 primary drainage "~ ...... ~' '."~'"': "'..'.' .'. '.:,.":"~':. '~'~ after tubing c/o 162 6.069 2.00 33% 2.508 41% i:;:~..' '."!.:;.'?:!~,; :!~i':.;::'...';i..'.......i.'~; i.:!':...' ....... W-23A primary drainage 226 8.444 2.00 24% 3.129 37% W-23 MI benefits after ,.' ." .' ..' :.".: .'.' ..:,. '.'= ...:".'~'" '?'".:.'".::: .: :='~ ;'. ":..'"....~." tubing c/o 39 1.189 '~ . ."..' ':..:.". · .:.:."..'..:..~.':'.' ":..:~.? .'.:': ::i..'~?.: :. ::~i':','..,:. ~' ;~'~ ?.:i:: .::.:.?..:;;~;'~; 0.119 10% W-23A MI benefits 85 2.778 ' .. ".. ::." ': "'...:.. ;',..."..i'":"';: .';..'.'.':' ?'!. :i: ". .". '!' ~'.:?".' '..~:.':."'!=.:,""..":'?:i' 0.278 10% The W-23A MI sector is 85 acres in the 42P through 45P layers and has an estimated 2.778 MMBO OIIP in the MI target zones. 'The MI benefit is estimated at 10% of this OOIP, or 0.278 MMBO. The parent W-23 MI recovery (if the well is repaired instead of drilling a sidetrack) is estimated at 0.119 MMSTB (10% of an OOIP of 1.189 MMBO). MI injection starts 1Q04. The MI slug is estimated to last about one year (350-400 days effective injection time at 12-15 MMSCFPD). The MI injection period is based on a slug size of 40% of the HCPV in the target MI zones. The MI slug is followed by water injection to displace and sweep out the mobilized oil before additional slugs of MI are applied. Currently the parent well is shut-in because of its mechanical condition. An alternative to sidetracking the well would be to repair the well (tubing change-out). Decline curve analysis indicates that the parent well would recover an additional 0.508 MMBO SLP if we can restore production levels to those before the tubing collapse. With MI benefits, the total IOR reserves for fixing the parent well are 0.572 MMBO. A conservative cost estimate for a tubing change-out is $1.2 MM, yielding $2.10/BO. As seen in Table 2, S:\GPB\Well Files\W~W-23A\Planning\W-23A Tech Package\W-23A Rig Technical package.doc 20-M~r-03 Page 13 of 20 repairing the well is not competitive with sidetracking the well. Hence, for the purpose of this analysis, it is assumed that the parent well remains shut-in. The sidetrack trajectory attempts to minimize loss of parent well reserves. 1311 Figure 7. W-24i MI pattern and W-23A drainage and MI patterns. Table 2. W-23 scenarios (decline curve 3redictions w! MI) # Scenario Recovery . To{al Cost USD/BBL MMBBL (MM $) 1 Continue producing W-23 after fixing0.572 1.200' 2.10 OA leak; no lateral or sidetrack 2 Sidetrack with rig to W-23A; 1.383 2.404 1.74 abandon parent well * Rough estimate Note that the EWE Phase II DSP production and reserves forecasts did not premise a W- 23A sidetrack; it premised continued production from W-23. Hence, only the reserves difference between the W-23A and W-23 tubing change-out (1.383 MMBO - 0.572 MMBO = 0.811 MMBO) would be additional to the EWE Phase II DSP. S:~GPB~Well Files\W~W-23A\Planning\W-23A Tech Package\W-23A Rig Technical package.doc 20-Mar-03 Page 14 of 20 STATE OF ALASKA ALAS'~x,OIL AND GAS CONSERVATION COMMISSIO~-'~ REPORT (.. SUNDRY WELL OPE,.ATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Pluggingm Pull tubing Alter casing __ Repair well Perforate x Other,,,x 2. Name of Operator BP Ex/~loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorac~e, Alaska 99519-6612 4. Location of well at surface 556' SNL, 1179' WEL, SEC. 21, T11N, R 12E, UPM At top of productive interval 2660'SNL, 175' WEL, SEC. 16, T11N, R12E, UPM At effective depth 2542'SNL, 80' WEL, SEC. 16, T11N, R12E, UPM At total depth 2521' SNL, 63' WEL, SEC. 16, T11N, R12E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 90. 61 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number W-23 (42-16-11-12) PBU 9. Permit number/approval number 89-128 / 10. APl number 50-029-21993 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 1O2OO true vertical BKB 9203 measured 10150 true vertical BKB 9160 Length Size .. 110 20 2642 13 3/8 9730 9 5/8 feet feet feet feet Plugs (measured)Magna Range bridge plug at 10150' MD Junk (measured) Cemented Measured depth True vertical depth BKB 146 146 3723 c.f. 2678 267,3 2018 c.f. 9766 8835 __ measured 9850;9866'; 9870'-9890'; 9890;9917'; 9928;9940'; 9940;9953~ 9953'-9954'; 9966'-9973'; .q.qT,'~L.q.q.q4': .q.q.q4 '-.q.q.qR' I' 1~¢)P~3' - l Ofl4Q' .¢ClTRd. ) true vertica§ubsea 8815'-8829'; 8832'-8849'; 8849'-8872'; 8882'-8892'; 8892'-8903'; 8903'-8904'; 8914 '-8920'; 8920'-8938'; 8938'-8940'; (8960'-8977' sazed) Tubing (size, grade, and measured depth)31/2" L-80 to10171' 0RJ61N L Packers and SSSV (type and measured depth~ 5/8" Otis HL packer at 9475'; external casing packers at 9859'.9918'.9952'.9992': ..... ,~ ,~ ,,;_,.~,, ::r,-,.;~ 13. Stimulation or cement squeeze summar~Gee Attachment 14. Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or Iniecti6~'bata r,,; ,,: ::. ::/., OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 410 615 298 1500 507 Subsequent to operation SI 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oilx Gas Suspended Service 17. I hgr. eb~ certify..,thatctb, e fore.~oing is true ~and.;co/.rect to the best of my knowledge. S i g n e ;~~.~"_ i~ ~-//~. ~q....~ ,,~~.--~.~-.~.-,.~ TitleTechnicalAssistantlll Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE W-23 DESCRIPTION OF WORK COMPLETED ADDPERF 09/01/97 SUMMARY The following additional interval were perforated using 2 1/2" guns, 4 SPF, random orientation and 60° phasing. 9849.5'-9865.5' MD TUBING PATCH O9/02/97 SUMMARY SET HES 3 1/2" RETRIEVABLE TUBING PATCH. THE HALLIBURTON 3.5" RCP PACKER/PATCH IS RETRIEVABLE. THIS WAS SET FROM THE TOP SEAL AT 9433.5' TO 9451' PROVIDING 17 FEET OF COVERAGE. THE HOLE WAS LOCATED AT 9448'. MINIMUM ID THROUGH PATCH IS 1.310". OVERALL LENGTH OF PATCH WITH PROFILE IS 22.37' Fluids Pumped BBLS. Description REPERF 11/01/97 SUMMARY The following interval were reperforated using 2 1/2" guns, 4 SPF, 90° orientation and 0/180° phasing. 9870'- 9890' MD TUBING PATCH 11/07/97 SUMMARY A 3 1/2" Halliburton Tubing Patch was successfully set with top element @ 9434' and bottom element @ 9451.5'. GLM # 1 @ 9440' and tbg leak @ 9448' should be totally isolated. Top of tbg patch assembly @ 9431.75'. Min ID thru patch = 1.31". Total length of patch - 22.37'. '1" Fluids Pumped BBLS. Description FRAC Operation 11/13/97 A Hydraulic Fracture treatment was performed using the following fluids:: SUMMARY The job was pumped without problems. There was not much reaction to acid treatment and subsequent soak sequence. There was still significant near well bore friction observed through out job, although treating pressures were lower than previous frac attempt. Well screened out while'in flush stage with 3 ppg on perfs. Got 4,500 lbs of 20/40 carbolite behind pipe and leaving 16,305 lbs in liner and tubing. Estimated sand top at 1724'. Recommend attempting to pull fit before cleaning out with coil.There were several changes to the program to note: First, the acid was change from 15% Hcl to 12% 90:10 Dad based on recent stim results out a W-Pad. Second, there was discrepancy in the frac design where 60' and 70' frac height had been used in the frac and data frac design. The 1st data frac was recalculated using the 60' parameter. Third, there was difficulty concluding fluid efficiency from the 1st data frac and so a the 2nd was pumped. Last, the frac design had changed significantly, such as increased pad volume and reduced total sand volume, based on all the previous data. ! Fluids Pumped BBLS. Description 329 Freshwater filtered w/2% Kcl ~ 100 deg. 121 12 % 90:10 Dad Acid 274 Frac gel - cross link. 30 Freshwater Gel. 754 Total Please sign and return to:~ Petrotechnical Data Cente~ BP Exploration (Alaska) Ino 900 East Benson Boulevard Anchorage, Alaska 99~08 Received ~Y ..... ALASKA OiL & u~' Cum~:~ATI~{ COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 4 August 1994 RE: ,. Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL B-12 (43-31-1-14) 7'2 ' "~ ~ M-32 (41-01-11-12) ~%/ ' 7~ N-25 (33-7-11-13) ~ ~/2~ W-23 ~O--3 g~- B-04 (23-29-11-14) ~ ~-~3-~ W-31 (31-17-11-12) DESCRIPTION 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1PLS STATIC RF SEPIA 1 PL/STATIC FINAL BL 1PL/STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA ECC No. Run # 1 5791.03 Run # 1 Run ~ 1 1317.02 Run ~ i Run # 1 5790.01 Run # 1 Run # 1 6238.02 Run # 1 Run ~ 1 4146.02 Run ~ 1 Run $ 1 5807.01 Run # 1 Run # 1 5659.02 Run # 1 Please sign and return to: Atlas Wireline Services ,.- 5600 B Street Suite 201 · Anchorage, ' RECEIVED Received b~./~~~/////~~ D ate------~.---~- ~aska 0il & o.~s 0,3D$. C o[iilTj,81j,O,! ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 16 July 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL N - 25 DESCRIPTION 1/~DIFLAC LDWG TAPE+LST ~-~\ Z-27 ~S-~5 z-15 /z PoK/GR ~.owG TAPE+~.ST /~ POK/~R ~.~W~ TAPE+~.ST ~PDK/GR LDWG TAPE+LST ~/PDK/GR LDWG TAPE+LST ECC No. Run # 1 6238.00 Run ~ 1 4269.01 Run ~ 1 3752.01 Run ~ 1 6026.02 Run # 1 4146.01 Please sign and return to~K~as Wireline Servic~ ~ 5600 B Street ~ ~ Suite 201 ~ ~ Anchorage, AK 99518// ~Attn. Rodne~aulson Received by:.. _/ ~ Date: , RECEIVED JUL 18 1994 Please si~n ~nd x~ttlx1~ 'tO= PetroteehnteaX Dat~ BP Exploration (Alaska) Ina 900 East Bensoll Bou~ev~ Received Date Petrotechnical Data C--ret BP Exploration (Alaska/ Inc 900 East Benson Boulevard Anchorage, Alaska 99.508 Received by Dste ALAS - COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date:~ 7 July 1994 RE: Transmittal of Data Sent by: ATLAS WIRELINE Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. /J~PDK/GR FINAL BL 1PDK/GR FINAL RF Run # 1 4269.01 Run # 1 ~FO_L-z.~ x-o7 (43-os-~o-14) i~LS FINAL BL ~ PLS FINAL' RF FINAL 'LS/ LS F .,IAL .F /~1 PDK/GR FINAL BL PDK/GR FIND~ RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 4046.04 4146.01 /~ SBT/GR FINAL BL 1 SBT/GR FINAL RF Run # 1 Run # 1 6229.00 /~CN/GR FINAL BL 1 CN/GR FINAL RF Run # Run # ! 1187.02 CN/GR FINAL BL CN/GR FINAL RF Run # 1 Run # 1 6012.01 j~COLLAR LOG FINAL BL 1 COLLAR LOG FINAL RF Run # 1 Run # 1 1991.02 Please sign and return to: Atlas Wire!ine Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: - STATE OF ALASKA AL AAOIL AND GAS CONSERVATION COMMIt ~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: OperatiOnpull tubingShUtd°wn Alter'" casingStimulate X Repair Pluggingwell. Perforate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 556' SNL, 1179' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2660'SNL, 175'WEL, SEC. 16, T11N, R12E, UPM At effective depth 2542' SNL, 80'WEL, SEC. 16, T11N, R12E, UPM At total depth 2521' SNL, 63'WEL, SEC. 16, T11N, R12E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service Other__ 6. Datum elevation (DF or KB) ~'~/~1 KBE= 90.61 AMSL fe~ I 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-23 (42-16-11-12) PBU 9. Permit number/approval number 89-128 / 10. APl number 50- 029-21993 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 10200 feet BKB 9203 feet Plugs (measured) Magna Range bridge plug at 10150' MD Effective depth: measured true vertical 10150 feet BKB 9160 feet Junk (measured) Casing Length Structural -- Conductor 110 Surface 2642 Intermediate 9730 Production -- Liner -- Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 146 146 13 3/8 3723 c.f. 2678 2673 9 5/8 2018 c.f. 9 766 8835 Open-hole completion w/isolated pay intervals: 9898'-9917', 9928'-9954', 9966'-9996' ( 10020' - 10040' sqzed.) true vertical subsea 8842'-8937' (three intervals) Tubing (size, grade, and measured depth) 3 1/2"L-80 to 10171' Packers and SSSV (type and measured depth) 9 5/8" Otis HL packer at 9475'; external casing packers at 9859',9918',9952',9992'; 3 1/2" SSSV at 2099' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. ,Bepresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing 'lS~'~ssure Prior to well operation 410 615 298 1500 5O7 Subsequent to operation 610 1034 564 2080 325 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations, Oil X Gas Suspended 17. I hereby certify that the foregoing.is true and correct to the best of my knowledge. Signed A,"z,,v~ .~..,~.~ r),,"vV..~ Title Senior Technical Assistant I Form 10-464~Rbv 06/15/88 ' ?--' Service Date SUBMIT IN DU~LI~'ATE WELL W-23(42-16-11-12) ACID Stimulation Operation 2/O8/92 Performed a HCL Matrix Stim. using the following fluids: FLUIDS PUMPED; 11 $ bbls filtered seawater 231 bbls PW 26 bbls BIOZAN 95 bbls 15% HCL 65 bbls MEOH fjh 6/29/93 STATE OF ALASKA AlasKA OIL AND GAS CONSERVATION COMMISb,ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate × Pull tubing Alter casing Repair well Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB~ BP Exploration (Alaska) Inc. KBE = 90.61 AM~. teet 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Development X Exploratory · Stratigraphic 7. Unit or Property name Service Prudhoe Bay Unit 8. Well number W-23 (42-16-11-12) PBU 9. Permit number/approval number 89-128/90-120 10. APl number 50- 029-21993 11. Field/Pool Prudhoe Oil Pool 4. Location of well at surface 556'SNL, 1179' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2660' SNL, 175' WEL, SEC. 16, T11N, R12E, UPM At effective depth 2542' SNL, 80' WEL, SEC. 16, T11N, R12E, UPM At total depth 2521'SNL, 63' WEL, SEC. 16, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10200feet BKB 9203feet 10150feet BKB 9160feet Plugs (measured) Junk (measured) Magna Range bridge plug at 10150' MD Casing Length Structural -- Conductor 110 Surface 2642 Intermediate 9730 Production -- Liner -- Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 146 146 13 3/8 3723 c.f. 2678 2673 9 5/8 2018 c.f. 9766 8835 Open-hole c, omp!e, tion w/isolate, d pa~y~,inte~,als: 9898 -9917, 9928'-9954, 9966 -9996 ( 10020' - 10040' sqzed.) true vertical subsea Tubing (size, grade, and measured depth) 3 1/2" L-80 to 10171' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 9 5/8" Otis HL packer at 9475'; external casing packers at 9859',99~18~9952',9992'; 3 1/2" SSSV at 2099' r~ r. ~ r, I \1 FI-) ~!'~, L-- ~,,,~ L- I · Bm, '"' MAR 1 5 t99) Alaska 0tl & Gas Cons. Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 530 1465 2348 1236 430 405 204 883 Tubing Pressure 288 262 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c~rtify that thee forego/jn~is true and correct to the best of my knowledge. Signed ~ J~3~,~~, L//r~-, ~ Title Senior TechnicalAssistant, Form 10-40~, ~ev 06/15/88 / ' - Date ~//~/~ SUBMIT IN DUiSLI~:ATE ~ 3/07/90 3/08/90 3/20/90 3/25/90 4/01/90 10/10/92 WELL W-23(42-16-11-12) AddPerf/NRWO/Reperf A Add Perf(Pre SQZ) was performed using 2 1/8" guns, 4 SPF, 90° orientation and 180° phasing. 10020' - 10040' MD A NRWO was performed using the following fluids: Squeeze #1 115 bbls PW to load well 20 bbls Cement 30 bbls Dual Polymer SQUF~EZE g2 10 bbls EFF H20 10 bbls Cement 32 bbls EFF. WTR 10 bbls Cement 14 bbls EFF. WTR 15 bbls. Dual Polymer CEMENT: FL28 1.12%, CD31 .15%, RI 1 .05%, FP6L 1 GAL/SK WELL CLEANED OUT TO 10145 FT. 10 bbls EFF H20(Spacer) 30 bbls EFF H20 A Add Perf(Post SQZ) was performed using 2" guns, 4 SPF, random orientation and 0° phasing. 9966'- 9996' MD A Add Perf was performed using 2" guns, 4 SPF, random orientation and 0° phasing. 9928' - 9948' MD 9948' - 9954' MD The following intervals were reperforated using 2" guns, 4 SPF, random orientation and 0° phasing. 9898' - 9917' MD Alaska 0il & Gas Cons. /~nchora~lo STATE OF ALASKA ~ ~ At_. ,KA OIL AND GAS CONSERVATION COMMIt · ,O "': REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 556' SNL, 1179' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2660'SNL, 175'WEL, SEC. 16, T11N, R12E, UPM At effective depth . Stimulate x Plugging Perforate Alter casing Repair well Other 5. Type of Well: Development X Exploratory Strafigraphic Service 2542' SNL, 80' WEL, SEC. 16, T11N, R12E, UPM At total depth 2521' SNL, 63' WEL, SEC. 16, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB RECEIYED FEB 1 5 0il ,& Gas Cons. C0m ss'tot 10200feet Plugs (measured) 9203feet 10150feet Junk (measured) 9160feet 6. Datum elevation (DF or KB) KBE = 90.61 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-23 (42-16-11-12) PBU 9. Permit number/approval number 89-128/ 10. APl number 50- 029-21993 11. Field/Pool Prudhoe Oil Pool Magna Range bridge plug at 10500' MD Casing Length Structural -- Conductor 110 Surface 2642 Intermediate 9730 Production -- Liner -- Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 146 146 13 3/8 3723 c.f. 2678 2673 9 5/8 2018 C. fo 9766 8835 Open-hole completion w/isolated pay intervals: 9898'-9917', 9928'-9954', 9966'-9996' ( 10020' - 10040' sqzed.) true vertical subsea 8842'-8937' (three intervals) Tubing (size, grade, and measured depth) 3 1/2"L-80 to 10171' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9475'; external casing packers at 9861', 9919', 9953', 9994'; 3 1/2" SSSVat 2099' 13. Stimulation or cement squeeze summary Intervals treated (measured) see attached Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 110 98O 331 0 1258 222 16. Status of well classification as: Oil X Gas Suspended 1225 260 1623 315 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned C~'~ ~,,~ Title Supervisor Peripheral & EOA Form 10-404 Rev b6/15/88 Service Date SUBMIT IN DUI~LIbATE BP EXPLORATION Rig: Audi #3 Well: W-23 (43-16-11-12) Daily Drilling Report -- Prudhoe Bay Unit January 12, 1990 at 0600 hrs AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: Current Operation: 0600 Depth: 10200' Day: 18 24- HourFtg: 0 Rig released at 0300 hrs. 1-12-90. Moving rig to W-19. Tested tree. Freeze protected annulus from top GLM with brine. Pulled plug from X nipple above packer. Set Magnaset plug in tubing above XN nipple. Set BPV. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: WT: VIS: PV: YP: SURVEY MD ANGLE DIRECTION TVD FL: Solids: Temp: °F SECTION COORDINATES DLS WELL W-23 (44-16.11-12~ PBU STIMULATION PROCEDURE A HCL Acid Perf Wash was performed on January 1, 1991 on the following perforations' 9898 - 9917'MDBKB 9928 - 9954'MDBKB 9966 - 9996'MDBKB 10020- 10040'MD BKB Squeezed Fluid summary is as follows: 92 Bbl 15% HCL W/10% Xylene 25 Bbls methanol 555 BblsPW 100 Bbls 60/40 meth mtp 02/05/91 A~aska Oi~ & Gas Gons. Gomm'~ss'~o~ AnChorag~ BP EXPLORATION BP Exoloration (Alaska)Inc. 900 East Oenson I~ou~evara P.O, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 l' TO: ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ~E OF A~ ARCHIVES DATE:... 07/30/90 T#: 81448 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564,4445. D-23 07/22/90 BHP Report Static Gradient W-11 07/13/90 BHP Reoprt Static Gradient W-12 07/14/90 BHP Report Static Gradient W-20 07/14/90 BHP Report Static Gradient W-23 07/14/90 BHP Report Static Gradient W-25 07/15/90 BHP Report Static Gradient W-26 07/14/90 BHP Report Static Gradient Z-14 07/13/90 BHP Report Static Gradient Z-22 07/16/90 BHP Report Static Gradient Z-27 07/15/90 BHP Report Static Gradient Information Control Well Records LR 2-1 J. Dietz/S. McCun7 RECEIVED '"~asl/~,.OJl & Gas Cons. commis i.o. '-' - Anchorage BP EXPLORATION 0 0 Alaska 011 & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/16/90 T#:81157 FROM' SUBJECT: Information Control Well Records LR2-1 I~P (~ASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-08 PERF 03/30/90 #1 8700-8930 HLS 5" C-05 PERF 03/22/90 #1 11600-11839 HLS 5" W-06 PERF 04/09/90 #1 12830-13307 HLS 5" W-23 CCL 04/01/90 #1 6850-9995 HLS 5" W-23 PERF 03/21/90 #1 9850-10075 HLS 5" W-23 PERF 03/25/90 #1 9800-10050 HLS 5" w-37 PERF 04/27/90 #1 9850-10194 HLS 5" Y-181 PERF 02/23/90 #1 10850-11260 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 T~. DISTRIBUTION Date' 05/01/90 T#:81134 FROM: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-23 COLLAR 0 1/1 1/90 # 1 93.50-10150 HLS 5" W-23 GR 01/10/90 #1 9750-1015~ HLS 5" Distribution: CHEVRON GEOSCIENC~ MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 20, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well W-23 (42-16-11-12) Enclosed, in duplicate, is form 10-407, our Report of Well Completion for the above named well. This information reflects the current condition and status of the well. Enclosed are two copies each of daily drilling reports, directional and gyroscopic surveys. Also included are (1) print and (1) sepia of all open hole logs run in the well. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KMT cc: R. I. Smith J. Martin (MB 9-4) Well File Anchora~ " ORIGINAL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number B.P Exploration. 89-128 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21993 4. 'Location of well at surface 9. Unit or Lease Name ~'~ ........... '* ..................... '~' Prudhoe Bay Unit 556' SNL, 1179' WEL, SEC. 21, T11N, R12E I' C¢;4~[~--~'~.' ~ L~;:~3"~"::~":;~'~ :~ At Top Producing Interval ~- _b~/~-- i "~:';'~'%;'~~' 10. Well Number , ~' ~:' ?'"' '" W-23(43;16-11-12) 2658' SNL, 175' WEL, SEC. 16, T12N, R12E i~Z~!~;= ~.~; ~,,~,..¢ ........ ~¢~ 11. Field and Pool At Total Depth i ~¢~'~ L~ ~?~;~%7_~ Prudhoo Bay Fiold/Prudhoo Bay Pool 2519'SNL, ~'WEL, SEC. 16, T11N, R12E 5. Elevation in feet (indi~te KB, DF, etc.) ~. Lease Designation and Sedal No. KBE = 90.61' 128263 12~ Date Spudded 13. Date T.D. Reach~ 14. Date Comp., Su~. or Aband. 115. Water Depth, if offshore 116. No. of Completions 12-25-89 01-08-90 ~I N/A f~t MSL I ONE 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+~D 19. Directional Survey ~20. Depth where SSSV set 121. Thickness of Permafrost 10200Y9203'~D 10150'MD/9160'TVD ~ ~ ~ BI 2099'feet MD I 1862' 22. Type El~tric or Other Logs Run ~HCS, CNL, DIFL, Bomhole Profile 23. CASING, LINER AND CEME~I~ R~ S~I~ DEp~ MD CASING SIZE ~. PER ~. ~DE TOP ~ ~E SIZE CEM~I~ R~D AMOUNT PULLED ,,, 20' ~nd. Sudace 146' 13-3/8" 68~ L-80 Sudace 2678' 17-1/2" 3915 cufl ~ldset fl 9-5/8" 47~ NSCC Sudace 9766' 12-1/4" 2018cu fl Class G 24. Pedorations o~n to Pr~uction (MD+TVD of T~ and Bottom and 25. T~I~ R~ORD interval, size and number) '" SIZE DE~ S~ (MD) PACKER S~ Hallibu~on Logging Se~ice 2" ~ 4 spf 3-1/2" 9.2~ L-80 10165' 9-5/8" ~ 9475' MD ~D~ (4) CTC Pkrs ~ 9861 ', 9919', 9953', & 9994' 26. ACID, F~C~RE, CEME~ ~UE~E, ~C. 9928L9954' 8882'~904" DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL ~ED 9966~9996' 8914'~9' .. 13-3/8" x 9-5/8" Freeze Prote~ed Annulus w/150 bbls DW Crude 27. PR~TI~ TEST D~te First Production IMethod of Operation (Flowing, g~ lift, etc.) Mamh 2~, . 1990 I Flowing Date of Test Hours Tested P~D~T~ OIL-BBL ~S-MCF WATER-BBL ~E~ IGAS-OIL RATIO TEST PERIOD ~ I Flow Tubing C~ing Pressure CALCU~TED OIL-BBL ~S-MCF WATER-BBL OIL G~VITY-API (corr) Press. 24-HOUR ~TE ~ 2~. CORE DATA ,.. Brief description of lithology, porosity, fractures, a~arent dips, and presen~ of oil, gas or water. Submit core chips. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. : ;: '~' 30. GE(:~OGIC MARKERS ~. ,~MATION TESTS ,, NAME .... Include Interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 9695' 8776' Shublik A 9734' .8808' Zone 4 9862' 8916' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~J ?~~-'~' TitlePBULoadEnclineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXi~OFI.~ION Daily Drilling Report -- Prudhoe Bay Unit December 26, 1989 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 1200' Day: 1 24- Hour Ftg: 1200' Current Operation: Tripping. Accepted rig 0900 hrs. 12-25-89. Spudded well 1430 hrs. 12-25-89. Skidded rig from W-08. Rigged up. Drilled 17-1/2" hole to 1200'. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: SPUD WT: 9.0 VIS: 260 PV: 23 YP: 62 FL: 13.8 Solids: 6 Temp: 62 °F SURVEY ,~M'D ANGLE DIRE~['IQN TVD SECTION .COORDINATES DLS 2 1024 .5 S6GE 1024 0.12 S.46 El.04 - Bi) EXFI.0R~N Daily Drilling Report -- Prudhoe Bay Unit December 27, 1989 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 APh 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 1510' Day: 2 24- Hour Ftg: 310' Current Operation: Jet drilling. Jet drilled/dr/lied 17-1/2" hole to 1510'. ~ ~ Shut-ln for Drill-By: W-22, W-24 Mud Type: SPUD WT: 9.1 VIS: 140 PV:20 ~,LI ~_V .V .V .V .V .V .V~ ~ ~ ANGLE DIRECTION TVD 5 1390 5.75 N60W 1390 YP: 33 FL: 15.4 ~ECTION 5 Solids: 7 Tcmp: COORDINATES N5.48 E0.74 49°F DLS Daily Drilling Report -- Prudhoe Bay Unit December 28, 1989 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 Al'I: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 2690' Day: 3 24- Hour Ftg: 1180' Current Operation: RIH with 13-3/8" casing. Drilled 17-1/2" hole to 2690'. RIH with 13-3/8" casing. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: SPUD WT: 9.7 VIS: 68 PV: 21 YP: 28 FL: - SURVI~Y MD ANGLE DIRECTION TVD SECTION 9 1860 4.5 N47W 1856 25 Solids: 10 Temp: - °F COORDINATES DLS N42 W46 ~ ~(P~.OR~ON Daily Drilling Report-- Prudhoe Bay Unit December 29, 1989 at 0600 hrs Rig: Audi 4/3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 2700' Day: 4 24- Hour Ftg: 10' Current Operation: Drilling 12-1/4" hole. RII--I with 13-3/8" casing. Bump plug with 2000 psi. - OK. No cement reran at surface. Did 200 sks top job. RU and test BOPE to 5000 psi. - OK. RIH with 12-1/4" bit. Test 13-3/8" casing to 3000 psi. - OK. Drilling 12-1/4" hole. Wells Shut-In for Drill-By: W-22, W-24' Ivlud Type: LSND WT: 9.2 VIS: 33 PV: 4 YP: 2 FL: 19.6 ~I,[R~Y MD ANGLE DIRECTION TVD SECTION Solids: 5 Temp: °F COORDINATES, DLS BP EXPLORAT~N Daily Drilling Report -- Prudhoe Bay Unit January 2, 1990 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AYE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 7100' Day: 8 96- Hour Ftg: 4400' Current Operation: Drilling 12-1/~" hole. Dr/lled 12-1/4" hole to 2800'. Kicked off with mud motor. Drilled 12-!/4" hole to 6853'. Motor run to 6985'. Drilled 12-1/4" hole to 7100'. Wells Shut-In for Drill-Bv: W-22 & W-24 Mud Type: LSND WT:9.7 VIS:37 PV: 12 YP: 10 FL:6.8 Solids: 10 Temp: 80°1:: SURVEY 14 31 43 55 MD 2860' 4462' 5579' 6794' ANGLE DIRECTION TVD ..S..ECTION (~©ORDINATES DLS 1.1 2854' 45 N72 W75 28.6 N5.7E 4355' 537 N559 E16 32.3 N3.3E 5309' 1103 N1138 E65 31.5 N8.9E 6334' 1738 N1787 E122 BP EXPLORAIION Rig: Audi #3 Well: W-23 (43-16-11-12) Daily Drilling Report-- Prudhoe Bay Unit January 3, 1990 at 0600 hrs AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 8000' Day: 9 24- Hour Ftg: 900' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole to 8000'. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LS WT: 9.7 VIS: 45 PV: 20 SURVEY MD ANGLE DIRE~WIQN TVD 60 7266 29.2 N18.8E 6744 YP: 16 FL: 65 SE~FIQN 1971 Solids: 12 Temp: - °F COORDINATES DLS N2011 E 184 BP EXPLORATtCN Daily Drilling Report-- Prudhoe Bay Unit January 4, 1990 at 0600 hfs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 APl: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 8675' Day: 10 24- HourFtg: 675' Current Operation: Drilling. Drilled 12-1/4" hole to 8675'. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LW SURVEY MD 68 8015 74 8577 WT: 9.8 VIS: 36 PV: 11 ANGLE DIRECTION 30.6 N29.3E 33.8 N36.0E TVD 7395 7872 YP: 8 FL: 7.4 SECTION 2339 2623 Solids: 13 Temp: 5: COORDINATES DLS N2~49 Wo.~4 N2596 W495 BP EXPLOR~N Daily Drilling Report-- Prudhoe Bay Unit January 5, 1990 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 9150' Day: 11 24- Hour Ftg: 475' Current Operation: Drilling. Drilled 12-1/4" hole to 8823'. Tested BOP's. Drilled 12-1/4" hole to 9150'. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LS WT: 9.7 VIS: 35 PV: 9 YP: 6 FL: 65 Solids: 13 Temp: ..SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES 77 8856 36.7 N38.8E 8150 2777 N2726 W592 90°F DLS BP EXPLOR~N Daily Drilling Report-- Prudhoe Bay Unit January 8, 1990 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 9825' Day: 14 72- Hour Ftg: 675' Current Operation: Drilling. Drilled 12-1/4" hole to 9773'. Ran and cemented 9-5/8" casing. Drilled to 9825'. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LS WT: 9.7 VIS: 42 PV: 12 YP: 10 FL: 8.2 TVD SECTION 8491 3037 8791 3222 SURVEY MD ANGLE DIRECTION 82 9338 35.3 N42.7E 85 9702 33.8 N44.8E Solids: 13 Temp: - °F COORDINATES DLS N2941 E774 - N3090 E917 - BP EXPLOR.~I'iON Rig: Audi #3 Well: W-23 (43-16-11-12) Daily Drilling Report -- Prudhoe Bay Unit January 9, 1990 at 0600 hrs AFE # 125113 APl: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 10200' Day: 15 24- Hour Ftg: 375' Current Operation: TIH. Drilled to 10200'. POH. Logged. TIH. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LS WT: 9.7 VIS: 35 PV:9 SURVEY MD ANGLE DIRECTION TVD YP: 6 FL: 11.8 SECTION Solids: 12 Temp: - cF .COORDINATES DLS BI~ EX]~ORATION Daily Drilling Report -- Prudhoe Bay Unit January 10, 1990 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600Depth: 10200' Day: 16 24- HourFtg: 0 Current Operation: Running tailpipe completion. Condition hole. POH. Ran 3-1/2" tubing with CTC packers and sliding sleeves. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LIGNO WT: 9.7 VIS: 35 PV:9 YP:5 FL: 12.2 SURVEY MD ANGLE DIRECTION TVD SECTION Solids: 13 Temp: °F COORDINATES DLS BP EXPLOR.a;rlON Daily Drilling Report-- Prudhoe Bay Unit January 11, 1990 at 0600 hrs Rig: Audi #3 Well: W-23 (43-16-11-12) AFE # 125113 API: 50-029-21993 AFE Amount: Current Amount: 0600 Depth: 10200' Day: 16 24- Hour Ftg: 0 Current Operation: NU tree. Ran 3-1/2" tailpipe completion. Logging string into place. Spaced out tubing. Landed hanger. Ran plug in X nipple. Tested tubing to 3500 psi. NU tree. Wells Shut-In for Drill-By: W-22, W-24 Mud Type: LIGNO WT: 9.7 VIS: 35 PV: 9 YP: 5 FL: 12.2 SURVEY MD. ANGLE DIRECTION TVD SECTION Solids: 13 Temp: - °F COORDINATES DLS GREAT LAND DIRECTIONAL DRILLING, Client .... : Field ..... : Well ...... : Section at: BP EXPLORATION West Eileen Pad W W-23 N,18.31,E INC. for GYRO/DATA, INC. IdlCROFILMED ORIGINAL ElevatiOn ~? Case ID ...... : 01/30/90 RADIUS OF CURVATURE Ol/18/9o 90.61 ft WW23 S MEA8 INCLN C DEPTH ANGLE VERTICAL-DEPTHS BKB SUB-SEA SECTION DIRECTION DISTNCE BEARING RELATIVE-COORDINATES FROM-WELL-HEAD CLOSURE DL DISTNCE BEARING /100 7 100 7 200 7 300 7 400 7 500 0.38 100.0 9.4 0.28 200.0 109.4 0.25 300.0 209.4 0.17 400.0 309.4 0.00 500.0 409.4 -0.0 S 37.81 E -0.3 S 41.82 E -0.6 S 42.00 E -0.7 S 56.46 E -0.7 8 83.05 E 0.1S 0.3E 0.6S 0.7E 0.9S 1.0E 1.2S 1.2E 1.2S 1.4E 0.3 S 63.91 E 0.38 0.9 8 48.38 E 0.10 1.3 S 46.15 E 0.03 1.7 8 46.81 E 0.08 1.8 S 48.59 E 0.17 6OO 700 8OO 9OO 1000 0.05 600.0 509.4 0.06 700.0 609.4 0.12 800.0 709.4 0.20 900.0 809.4 0.13 1000.0 909.4 -0.7 N 18.37 W -0.6 N 21.12 E -0.4 N 35.06 E -0.2 N 8.57 E 0.1 N 33.97 E 1.2S 1.4E 1.1S 1.4E 0.98 1.4E 0.7S 1.5E 0.48 1.6E 1.8 8 49.29 E 0.05 1.7 S 51.68 E 0.01 1.7 8 56.82 E 0.06 1.7 8 66.05 E 0.08 1.7 8 75.71 E 0.07 1100 1200 1300 1400 1500 0.21 1100.0 1009.4 0.33 1200.0 1109.4 1.25 1300.0 1209.4 5.93 1399.8 1309.1 8.67 1498.9 1408.3 0.4 N 23.11 E 0.9 N 43.54 E 2.2 N 5.07 W 6.5 N 47.68 W 11.8 N 47.25 W 0.28 1.8E 0.2N 2.0E 1.5N 2.5E 7.0N 0.2W 15.6N 9.6W 1.8 8 84.90 E 2.1 N 83.54 E 2.9 N 59.01 E 7.0 N 1.88 W 18.3 N 31.64 W 0.08 0.12 0.92 4.7r 2.7,~ 1600 1700 1800 1900 2000 8.41 1597.8 1507.2 6.57 1697.0 1606.4 4.86 1796.5 1705.9 4.78 1896.1 1805.5 4.84 1995.8 1905.2 18.1 N 45.35 W 23.7 N 47.81 W 27.9 N 44.63 W 32.0 N 40.32 W 36.6 N 37.35 W 25.8 N 20.3 W 34.8 N 29.8 W 41.7 N 37.0 W 47.9 N 42.7 W 54.4 N 47.9 W 32.9 N 38.21 W 45.8 N 40.58 W 55.7 N 41.59 W 64.1 N 41.70 W 72.5 N 41.37 W 0.26 1.84 1.71 0.09 0.06 7 2100 7 2200 7 2300 7 2400 7 2500 4.42 2095.4 2004.8 2.99 2195.2 2104.6 1.89 2295.1 2204.5 0.97 2395.1 2304.5 0.64 2495.1 2404.5 41.3 N 34.34 W 45.2 N 34.75 W 47.6 N 39.07 W 48.9 N 44.17 W 49.4 N 54.23 W 60.9 N 52.6 W 66.3 N 56.3 W 69.7 N 58.9 W 71.5 N 60.5 W 72.4 N 61.6 W 80.5 N 40.82 W 87.0 N 40.35 W 91.2 N 40.19 W 93.7 N 40.23 W 95.1 N 40.36 W 0.42 1.43 1.10 0.92 0.33 'Survey Codes: 7/GYRO S MEAS INCLN C DEPTH ANGLE 7 2600 0.51 7 2700 0.41 7 2800 0.32 7 2900 1.83 7 3000 4.14 7 3100 6.18 7 3200 8.49 7 3300 10.97 7 3400 13.58 7 3500 15.67 7 3600 18.14 7 3700 20.85 7 3800 22.68 7 3900 25.70 7 4000 28.03 7 4100 28.71 7 4200 28.74 7 4300 29.00 7 4400 28.89 7 4500 28.68 7 4600 29.32 7 4700 30.10 7 4800 30.98 7 4900 31.59 7 5000 31.98 7 5100 32.52 7 5200 32.68 7 5300 33.06 7 5400 32.89 7 5500 32.75 VERTICAL-DEPTHS BKB SUB-SEA 2595.1 2504.5 2695.1 2604.5 2795.1 2704.5 2895.1 2804.5 2994.9 2904.3 SECTION DISTNCE RECORD OF SURVEY DIRECTION BEARING 49.6 N 67.30 W 49.6 N 78.48 W 49.9 N 12.52 W 51.6 N 7.65 E 56.8 N 9.52 E 3094.5 3003.9 65.7 3193.7 3103.1 78.5 3292.2 3201.6 95.4 3389.9 3299.3 116.6 3486.7 3396.1 141.8 3582.4 3491.8 170.9 3676.6 3586.0 204.2 3769.5 3678.9 241.1 3860.7 3770.1 281.7 3949.9 3859.3 326.3 4037.9 3947.3 373.1 4125.6 4035.0 420.3 4213.2 4122.5 467.5 4300.7 4210.1 514.9 4388.3 4297.7 562.1 4475.8 4385.2 609.6 4562.6 4472.0 658.0 4648.8 4558.1 707.7 4734.2 4643.6 758.4 4819.2 4728.6 809.6 4903.8 4813.2 861.5 4988.0 4897.4 914.3 5072.0 4981.4 967.3 5155.9 5065.3 1020.2 5240.0 5149.3 1072.7 RELATIVE-COORDINATES FROM-WELL-HEAD 72.9 N 62.5 W 73.2 N 63.2 W 73.6 N 63.6 W 75.5 N 63.7 W 80.6 N 62.9 W N 17.56 E 89.3 N 60.8 W N 17.47 E 101.5 N 57.0 W N 15.82 E 117.7 N 52.2 W N 15.15 E 138.2 N 46.5 W N 16.17 E 162.5 N 39.~'W N 15.58 E N 14.99 E N 11.00 E N 9.89 E N 8.32 E N 8.33 E N 6.45 E N 5.94 E N 7.67 E N 6.56 E N 6.02 E N 5.83 E N 6.64 E N 5.22 E N 4.42 E N 5.71 E N 7.25 E N 4.93 E N 4.04 E N 4.04 E 190.5 N 31.7 W 222.7 N 22.9 W 258.8 1%1 14.6 W 299.1 N 7.2 W 343.7 N 0.0 W 390.7 N 6.9 E 438.4 N 13.1 E 486.4 N 18.3 E 534.4 N 24.0 E 582.2 N 30.0 E 630.4 N 35.3 E 679.7 N 40.4 E 730.2 N 45.9 E 781.8 N 51.3 E 834.3 N 55.7 E 887.5 N 60.4 E 941.0 N 66.5 E 995.0 N 72.2 E 1049.2 N 76.5 E 1103.3 N 80.3 E CLOSURE DISTNCE BEARING 96.0 N 40.57 W 96.7 N 40.83 W 97.3 N 40.85 W 98.8 N 40.18 W 102.3 N 37,99 W 108.1 N 34.26 W 116.4 N 29.31 W 128.7 N 23.90 W 145.8 N 18.59 W 167.3 N 13.72 W 193.1 N 9.45 W 223.8 N 5.88 W 259.2 N 3.23 W 299.2 N 1.37 W 343.7 N 0.00 W 390.8 N 1.01 E 438.6 N 1.71 E 486.7 N 2.15 E 535.0 N 2.57 E 583.0 N 2.95 E 631.4 N 3.20 E 680 · 9 N 3 · 40 E 731.6 N 3.60 E 783.5 N 3.75 E 836.2 N 3.82 E 889.5 N 3.89 E 943.4 N 4.04 E 997.6 N 4.15 E 1052.0 N 4.17 E 1106.2 N 4.16 E /lOO 0.13 0.10 0.09 1.51 2.31 2.04 2.3.~ 2.48 2.61 2.09 2.47 2.71 1.92 3.03 2.36 0.68 0.44 0.29 0.42 0.33 0.6',. 0.78 0.91 0.72 0.45 0.66 0.48 0.79 0.31 0.14 'Survey Codes: 7/GYRO S MEAS INCLN C DEPTH ANGLE 7 5600 32.87 7 5700 32.20 7 5800 32.15 7 5900 32.39 7 6000 32.85 7 6100 33.23 7 6200 33.23 7 6300 33.16 7 6400 32.95 7 6500 32.99 7 6600 32.60 7 6700 32.05 7 6800 31.77 7 6900 30.35 7 7000 29.06 7 7100 28.70 7 7200 29.43 7 7300 29.27 7 7400 29.11 7 7500 29.47 7 7600 29.75 7 7700 29.94 7 7800 29.96 7 7900 29.97 7 8000 30.88 7 8100 31.57 7 8200 31.41 7 8300 31.27 7 8400 32.05 7 8500 32.99 VERTICAL-DEPTHS BKB SUB-SEA SECTION DISTNCE 5324.0 5233.4 1125.0 5408.3 5317.7 1177.1 5492.9 5402.3 1228.6 5577.5 5486.9 1280.2 5661.7 5571.1 1332.4 5745.6 5654.9 1385.2 5829.2 5738.6 1438.5 5912.9 5822.3 1492.1 5996.7 5906.1 1545.6 6080.6 5990.0 1599.0 6164.7 6074.0 1652.1 6249.2 6158.5 1704.7 6334.0 6243.4 1756.8 6419.7 6329.1 1808.0 6506.6 6416.0 1857.4 RECORD OF SURVEY DIRECTION BEARING N 2.78 E N 4.41 E N 3.22 E N 3.63 E N 4.04 E N 3.64 E N 6.20 E N 7.25 E N 6.95 E N 6.67 E RELATIVE-COORDINATES FROM-WELL-HEAD 1157.4 N 83.5 E 1211.1 N 86.9 E 1264.2 N 90.5 E 1317.5 1~ 93.6 E 1371.3 N 97.3 E 1425.7 N 100.9 E 1480.3 N 105.6 E 1534.6 N 112.0 E 1588.8 N 118.8 E 1642.8 N 125.2 E N 7.41 E 1696.6 N 131.9 E N 8.09 E 1749.5 N 139.1 E N 9.51 E 1801.8 N 147.1 E N 12.73 E 1852.4 N 157.1 E N 16.71 E 1900.3 N 169.7 E 6594.1 6503.5 1905.7 N 19.19 E 6681.5 6590.9 1954.3 N 19.37 E 6768.7 6678.1 2003.3 N 19.75 E 6856.0 6765.4 2052.0 N 21.66 E 6943.2 6852.6 2100.8 N 22.46 E 1946.3 N 184.6 E 1992.1 N 200.6 E 2038.3 N ' 217.0 E 2083.9 N 234.3 E 2129.3 N 252.6 E 7030.2 6939.5 2150.1 7116.9 7026.3 2199.7 7203.5 7112.9 2249.3 7290.2 7199.6 2298.5 7376.4 7285.8 2348.2 7461.9 7371.3 2399.0 7547.2 7456.6 2450.0 7632.6 7542.0 2500.4 7717.7 7627.1 2550.9 7802.0 7711.4 2602.2 N 22.61 E 2174.9 N 271.6 E N 23.49 E 2220.7 N 291.1 E N 26.07 E 2266.0 N 312.0 E N 29.75 E 2310.1 N 335.4 E N 29.47 E 2354.2 N 360.4 E N 29.61 E 2399.3 N 385.9 E N 32.09 E 2444.1 N 412.7 E N 33.27 E 2487.9 N 440.8 E N 34.68 E 2531.4 N 470.1 E N 37.12 E 2575.0 N 501.7 E CLOSURE DISTNCE BEARING 1160.4 N 4.13 E 1214.2 N 4.11 E 1267.4 N 4.09 E 1320.8 N 4.07 E 1374.7 N 4.06 E 1429.2 N 4.05 E 1484.0 N 4.08 E 1538.7 N 4.17 E 1593.2 N 4.27 E 1647.6 N 4.36 E 1701.7 N 4.44 E 1755.1 N 4.54 E 1807.8 N 4.67 E 1859.0 N 4.85 E 1907.9 N 5.10 E 1955.0 N 5.42 E 2002.2 N 5.75 E 2049.8 N 6.08 E 2097.0 N 6.41 E 2144.2 N 6.77 E 2191.8 N 7.12 E 2239.7 N 7.47 E 2287.4 N 7.84 E 2334.4 N 8.26 E 2381.6 N 8.70 E 2430.1 N 9.14 E 2478.7 N 9.58 E 2526.6 N 10.05 E 2574.7 N 10.52 E 2623.4 N 11.02 E /lOO 0.39 0.81 0.34 0.27 0.48 0.4(~ 0.7'. 0.32 0.23 0.09 0.45 0.58 0.48 1.64 1.60 0.68 0.73 0.18 0.48 0.41 0.2b 0.29 0.64 0.92 0.91 0.69 0.69 0.35 0.88 1.19 ASurvey Codes: 7/GYRO S MEAS INCLN C DEPTH ANGLE 7 8600 34.36 7 8700 36.00 7 8800 37.05 7 8900 36.22 7 9000 35.64 7 9100 35.58 7 9200 35.89 7 9300 35.52 7 9400 34.91 7 9500 34.62 7 9600 35.01 7 9700 34.51 7 9800 33.16 7 9900 31.61 7 10000 31.92 7 10100 31.95 VERTICAL-DEPTHS BKB SUB-SEA SECTION DISTNCE 7885.3 7794.6 2654.7 7967.0 7876.4 2709.3 8047.3 7956.7 2765.6 8127.6 8037.0 2822.0 8208.6 8117.9 2877.1 8289.9 8199.2 2931.4 8371.0 8280.4 2985.8 8452.2 8361.6 3039.3 8533.9 8443.3 3092.0 8616.1 8525.5 3144.0 8698.2 8607.6 3196.1 8780.3 8689.7 3248.3 8863.4 8772.8 3299.5 8947.8 8857.2 3349.1 9032.9 8942.3 3398.3 RECORD OF SURVEY 9117.7 9027.1 3448.0 DIRECTION BEARING RELATIVE-COORDINATES FROM-WELL-HEAD N 36.94 E 2619.2 N 535.0 E N 36.93 E 2665.3 N 569.7 E N 37.33 E 2712.7 N 605.6 E N 37.34 E 2760.2 N 641.8 E N 39.49 E 2806.1 N 678.2 E N 39.43 E 2851.1 N 715.2 E N 40.12 E 2896.0 N 752.6 E N 43.51 E 2939.5 N 791.5 E N 41.15 E 2982.1 N 830.3 E N 43.66 E 3024.2 N 868.8 E N 41.48 E 3066.2 N 907.4 E N 42.37 E 3108.7 N 945.5 E N 40.77 E 3150.3 N 982.4 E N 39.82 E 3191.2 N 1017.1 E N 38.91 E 3231-.9 N 1050.5 E CLOSURE DISTNCE BEARING 2673.3 N 11.55 E 2725.5 N 12.06 E 2779.5 N 12.58 E 2833.8 N 13.09 E 2886.9 N 13.59 E 2939.4 N 14.08 E 2992.2 N 14.57 E 3044.2 N 15.07 E 3095.5 N 15.56 E 3146.5 N 16.03 E 3197.7 N 16.49 E 3249.3 N 16.92 E 3300.0 N 17.32 E 3349.3 N 17.68 E 3398.3 N 18.01 E N 37.61 E 3273.4 N 1083.2 E 3448.0 N 18.31 E DL' /100 1.37 1.64 1.06 0.83 0.93 0.06 0.3[ 1.20 0.98 0.86 0.82 0.58 1.43 1.57 0.40 0.37 'Survey Codes: 7/GYRO DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL SUBSEA MEAS BKB MD-TVD VERT DEPTH DEPTH DEPTH DIFF CORRECT 0 91 91 0 0 100 191 191 0 0 200 291 291 0 0 300 391 391 0 0 400 491 491 0 0 50O 6OO 700 8OO 9OO 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 250O 2600 2700 2800 2900 591 691 791 891 991 1091 1191 1291 1391 1492 1593 1694 1794 1894 1995 2095 2195 2295 2396 2496 2596 2696 2796 2896 2996 591 0 0 691 0 0 791 0 0 891 0 0 991 0 0 1091 0 0 1191 0 0 1291 0 0 1391 0 0 1491 1 1 1591 2 1 1691 3 1 1791 4 1 1891 4 0 1991 4 0 2091 5 0 2191 5 0 2291 5 0 2391 5 0 2491 5 0 2591 5 0 2691 5 0 2791 5 0 2891 5 0 2991 5 0 RELATIVE COORDINATES FROM WELL HEAD 0.18 N 0.16 E 0.55 S 0.63 E 0.90 S 0.94 E 1.15 S 1.22 E 1.22 S 1.38 E 1.24 S 1.40 E 1.08 S 1.37 E 0.96 S 1.43 E 0.72 S 1.54 E 0.44 S 1.64 E 0.19 S 1.78 E 0.19 N 2.01 E 1.30 N 2.47 E 6.27 N 0.32 E 14.71 N 8.67 W 25.07 N 19.57 W 34.29 N 29.24 W 41.30 N 36.64 W 47.51 N 42.36 W 54.05 N 47.65 W 60.63 N 52.43 W 66.06 N 56.16 W 69.55 N 58.76 W 71.48 N 60.46 W 72.42 N 61.53 W 72.93 N 62.41 W 73.17 N 63.19 W 73.56 N 63.66 W 75.32 N 63.75 W 80.30 N 63.00 W DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL SUBSEA MEAS BKB MD-TVD VERT DEPTH DEPTH DEPTH DIFF CORRECT 3000 3100 3200 3300 3400 35OO 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 550O 5600 5700 5800 5900 3096 3197 3298 3401 3504 3609 3715 3823 3933 4046 4160~ 4274 4389 4503 4617 4732 4849 4966 5084 5203 5322 5441 5560 5679 5797 5916 6034 6154 6273 6393 3091 5 0 3191 6 1 3291 8 1 3391 10 2 3491 13 3 3591 18 5 3691 24 6 3791 32 8 3891 43 10 3991 56 13 4091 ~70 14 4191 84 14 4291 98 14 4391 112 14 4491 126 14 4591 142 15 4691 158 17 4791 176 17 4891 194 18 4991 212 19 5091 232 19 5191 251 19 5291 270 19 5391 288 19 5491 307 18 5591 325 18 5691 344 19 5791 363 19 5891 383 20 5991 402 19 RELATIVE COORDINATES FROM WELL HEAD 88.95 N 61.00 W 101.08 N 57.14 W 117.40 N 52.23 W 138.35 N 46.45 W 163.56 N 39.37 W 193.09 N 30.99 W 227.84 N 21.52 W 267.59 N 12.87 W 313.50 N 4.62 W 365.28 N 3.15 E 419.28 N 11.10 E 473.94 N 17.09 E 528.99 N 22.64 E 583.45 N 30.11 E 638.70 N 36.16 E 695.93 N 41.92 E 755.26 N 49.17 E 816.54 N 54.71 E 879.21 N 58.61 E 942.65 N 66.77 E 1007.01 N 1071.60 N 1135.79 N 1199.99 N 1262.59 N 73.48 E 78.08 E 83.37 E 84.34 E 92.02 E 1325.81 N 1389.91 N 1455.17 N 1520.33 N 1584.78 N 94.08 E 98.77 E 100.74 E 108.81 E 118.81 E DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL SUBSEA MEA8 BKB MD-TVD VERT DEPTH DEPTH DEPTH DIFF CORRECT 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 7200 7300 7400 7500 7600 7700 7800 7900 8OOO 8100 8200 8300 8400 85OO 8600 8700 8800 8900 RELATIVE COORDINATES FROM WELL HEAD 6512 6631 6749 6866 6982 6091 421 19 6191 440 19 6291 458 18 6391 476 17 6491 491 16 1649.28 1713.01 1775.31 1836.05 1892.78 125.80 E 133.58 E 141.40 E 148.89 E 160.33 E 7096 7210 7325 7440 7554 6591 505 14 6691 520 14 6791 535 15 6891 549 15 6991 564 15 1945.67 N 1996.97 N 2050.14 N 2102.12 N 2154.15 N 179.02 E 202.22 E 220.17 E 240.75 E 262.73 E 7670 7785 7901 8017 8134 7091 579 15 7191 594 15 7291 610 15 7391 626 16 7491 643 17 2207.37 N 2261.23 N 2310.36 N 2361.61 N 2415.55 N 283.63 E 303.39 E 335.48 E 364.51 E 392.53 E 8251 8368 8486 8606 8729 7591 660 17 7691 677 17 7791 696 18 7891 716 20 7991 739 23 2467.37 N 2519.00 N 2572.52 N 2622.15 N 2679.32 N 425.34 E 458.03 E 491.30 E 537.25 E 579.69 E 8854 8978 9101 9224 9347 8091 763 25 8191 787 24 8291 810 23 8391 834 23 8491 856 23 2738.50 N 2799.81 N 2851.53 N 2908.53 N 2955.77 N 625.22 E 664.40 E 715.56 E 758.84 E 813.19 E 9469 9591 9712 9832 9950 8591 878 22 8691 900 22 8791 922 22 8891 942 20 8991 960 18 3015.70 N 3055.62 N 3113.21 N 3162.74 N 3210.16 N 850.53 E 909.71 E 950.86 E 994.91 E 1035.40 E DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL SUBSEA MEAS BKB MD-TVD VERT DEPTH DEPTH DEPTH DIFF CORRECT RELATIVE COORDINATES FROM WELL HEAD 9000 10068 9091 977 18 3257.35 N 1075.80 E DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL MEAS BKB SUBSEA DEPTH DEPTH DEPTH RELATIVE COORDINATES FROM WELL HEAD 1000 1000 909 2000 1996 1905 3000 2995 2904 4000 3950 3859 5000 4819 4729 0.42 S 1.65 E 54.40 N 47.91 W 80.61 N 62.95 W 343.69 N 0.01 W 834.33 N 55.70 E 6000 5662 5571 7000 6507 6416 8000 7376 7286 9000 8209 8118 10000 9033 8942 1371.28 N 1900.31 N 2354.17 N 2806.14 N 3231.87 N 97.26 E 169.68 E 360.38 E 678.24 E 1050.48 E 3900 3600 33OO 3000 2?00 2t00 1800 t500 t200 900 600 300 300 tBO0 Marker Identification MD N/S E/W A} KB 0 0 N 0 E B) GLM 2977 79 N 63 W C) GLM 58t4 tt65 N 84 E D) GLM 730t 2039 N 2t7 E E) LOWER SHALE 7435 2100 N 241 E F) IKRU/PBU/LCU 7435 2t00 N 241 E G) BASE HRZ 7435 2t00 N 24t E H) JKU 8t03 240t N 387 E I) J-G 9t38 24t8 N 398 E J) BLM 9279 2479 N 435 E K) J-F 8483 2588 N 498 E L) J-E 8751 2689 N 588 E ~) GLM 8827 2726 N 8t5 E N) J-D 8988 280] N 674 E O) J-C 9322 2949 N BO0 E P) GLM 9433 2996 N 943 E PLAN VIEW BP EXPLORATION N-23 CLOSURE ..... : 3448 ft N 18.31E DECLINATION.: 30.00 E SCALE ....... : 1 inch = 600 feet DRAWN ....... : 01/31/90 S) SAG ) , 9695 3,t07 N 944 · ~) S~'_BLI_~ B_ i gBO0 3t50 N 992 ,v) EiLEnd i 9953 3i72 N tOOi ~) SL]D]~ SLEEVE 9878 3~82 N ~)) SLIDING SLEEVE~ gBgg 3t91 N )) SLIDI~ SLEEVE~ 9936 3206 N t029 :) SLIDI~ SLEEVE( ~7t 3220 N t04t )) P.O.W.~./WATER INFL 10024 3242 N t058 ~) ZONE 3 10098 3273 N t083 'i) TD _) tut00 3273 i) PBTD ~ ~ ~O~5O 3294 N t099 ~) DRILL~'S DEP~ ~O200 33i5 N . .. ( ( .. ) ............ , ........ ..... i ,.. .... {~ , ~ ..... ..... ,,, ,, t500 t200 900 600 300 0 300 600 900 t200 t500 1800 Lend Ol'ra£ tl'onsl 600 ~200 ~800 2400 3000 3800 4200 T 48oo V 5400 6000 6600 7200 7800 8400 9000 9600 10200 10800 600 VERTICAL SECTION BP EXPLORATION N-23 Section at: N 1B.3~ E TVD Scale.: ~ inch = 1200 feet Dep Scale.: ~ inch = ~200 feet Dnawn .....: 0~/3i/90 Marker Identification MD TVD DEPR7 INCLN A) KB 0 0 0 0.00 B) DRILLER'S DEPTH ~0200 9203 3498 3~.95 600 1200 i800 2400 3000 3600 4200 4800 5400 6000 6600 Departure Marker Identification HO N/S ElM A] KB 0 0 N 0 E B) DRILLER'S DEPTH 10200 33i5 N iii6 E PLAN VIEW BP EXPLORATION Y-23 CLOSURE ..... : 344B ft N 18.31E DECLINATION.: 30.00 E SCALE ....... : 1 inch = 600 feet BRAWN ....... : 0~/3~/90 3900 3600 330O 3000 ~700 240O 2i00 1800 t200 9OO 600 3OO 300 300 i1 I t 'I I ,, " // ~ ! .... Ii .... I ,. t l I i11. 1 0 300 600 900 1200 t500 1800 2i00 2400 2700 3000 3300 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800 8400 90OO 9600 10200 10800 t 600 0 600 t200 t800 240O VERTICAL SECTION BP EXPLORATION N-23 Section at: N tB.31E TVD Scale.: 1 inch : 1200 feet Oep Scale.' 1 inch = 1200 feet Drawn · 01/31/90 Marker Identification MD TVD DEPRT INCLN A) KB 0 0 0 0.00 B) GLM 2977 2972 55 3.6t ~ SLM 56t4 5336 tt32 32.78 D) GLM 730t 6770 2004 29.27 E} IKRU/PBU/LCU 7435 6887 2069 29.24 F) BASE HRZ 7435 6887 2069 29.24 G] LOWER SHALE 7435 6887 2069 29.24 H) JKU 8t03 7464 240t 3t.57 I) d-G 8t38 7494 24t8 3t.5t J) GLM 8279 78t5 2490 3i.30 K] J-F 8483 7788 2593 32.83 L) J-E 8751 8008 2738 36.54 M] 6LM 8827 8069 278t 36.83 NJ J-D 8988 8t99 287t 35.7! O] J-C 9322 8470 3051 35.39 P} GLM 9433 856t 3~09 34.8t 9) PACKER 9489 859t 3~28 34.7t R) J-B 95t0 8624 3t49 34.66 S) SAG 9695 8776 3246 34.54 T) SHUBLIK A 9734 BBOB 3266 34.05 U) 9 5/8 CASING SHOE 9766 8835 3282 33.62 V) SHUBLIK B 9800 8863 3299 33.t6 N] SHUBLIK C 9826 8885 33t3 32.76 X} EILEEN 9853 8908 3326 32.34 Y} ZONE 4 9862 89t6 3330 32.20 Z} SLIDING SLEEVE 9878 8929 3338 3t.95 a) SLIDING SLEEVE 9899 8947 3349 3t.63 bi SLIDING SLEEVE 9936 8978 3367 3t.72 c) SLIDING SLEEVE 997t 9008 3384 3t.83 3000 3~0 4 0 4 0 Departure] ~1 TELE£OI Teleco Oilfield Se ;s of Alaska Inc. 61 16 Nielson Way Anchorage, AK 99§02 (907) 562-2646 January 15, 1990 JOB #733 BP EXPLORATION (ALASKA) INC. WELL: W-23 PRUDHOE BAY - EILEEN WEST END RIG: AUD #3 ORIGINAL Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jo~nat~ha 'n~G~s Field Operations Supervisor JGM/el Enclosures HICROFILMED Date A ,~I/~T COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 1/7/90 Company: Well: Location: Rig: BP EXPLORATION W-23 W'23PRUDHOE BAY - EILEEN WEST END AUDI 3 TELECO Job # 733TAK Grid Correction: 0.0° Magnetic Declination: 30.0° Total grid correction: 30.0° Proposed Direction: 17.8° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' TIE-IN TO SPERRY SUN GYRO 2660 0 0.5 263.0 2654.42 45.38 71.12N 73.12W 102.00 N 45.79W 0.00 TELECO MWD SURVEYS 2766 106 0.4 258.9 2760.42 45.01 70.99N 73.94W 102.51 N 46.17W 0.10 2860 94 1.1 8.9 2854.41 45.74 71.82N 74.12W 103.21 N 45.90W 1.38 2953 93 2.9 8.2 2947.35 48.94 75.03N 73.65W 105.14 N 44.47W 1.94 3046 93 4.9 13.1 3040.13 55.22 81.23N 72.41W 108.82 N 41.72W 2.18 PAGE 1 Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 3138 92 7.1 18.4 3131.62 64.82 90.45N 69.73W 114.21 N 37.63W 2.46 3231 93 9.3 15.9 3223.67 78.08 103.13N 65.86W 122.37 N 32.56W 2.40 3325 94 11.5 14.5 3316.12 95.03 119.51N 61.43W 134.38 N 27.20W 2.36 3419 94 13.8 16.3 3407.83 115.60 139.35N 55.94W 150.16 N 21.87W 2.48 3511 92 15.9 18.4 3496.75 139.17 161.84N 48.88W 169.06 N 16.80W 2.36 3605 94 18.4 16.6 3586.56 166.88 188.28N 40.57W 192.60 N 12.16W 2.72 3699 94 20.7 15.2 3675.14 198.31 218.53N 31.98W 220.86 N 8.32W 2.50 3792 93 22.4 11.7 3761.64 232.36 251.75N 24.07W 252.90 N 5.46W 2.29 3884 92 25.0 11.0 3845.87 269.11 288.01N 16.80W 288.50 N 3.34W 2.85 3978 94 27.7 10.7 3930.09 310.53 328.99N 8.95W 329.11 N 1.56W 2.87 4089 111 28.7 6.1 4027.93 362.23 380.85N 1.33W 380.85 N 0.20W 2.16 4184 95 28.6 5.7 4111.30 406.80 426.16N 3.35E 426.17 N 0.45E 0.23 4277 93 28.6 5.7 4192.95 450.34 470.46N 7.78E 470.52 N 0.95E 0.00 4371 94 28.8 6.1 4275.40 494.51 515.36N 12.42E 515.51 N 1.38E 0.29 PAGE 2 Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 4462 91 28.6 5.7 4355.22 537.27 558.83N 16.91E 559.08 N 1.73E 0.30 4556 94 28.6 6.4 4437.75 581.33 603.57N 21.65E 603.96 N 2.05E 0.36 4649 93 29.5 5.4 4519.05 625.51 648.49N 26.29E 649.02 N 2.32E 1.10 4740 91 30.2 5.4 4597.98 669.75 693.58N 30.55E 694.25 N 2.52E 0.77 4833 93 31.0 4.3 4678.02 715.89 740.76N 34.55E 741.56 N 2.67E 1.06 4926 93 31.6 5.0 4757.48 762.95 788.92N 38.47E 789.86 N 2.79E 0.75 5021 9'5 31.8 4.7 4838.31 811.60 838.66N 42.70E 839.75 N 2.91E 0.27 5110 89 32.3 5.4 4913.75 857.67 885.70N 46.86E 886.94 N 3.03E 0.70 5201 91 32.5 4.7 4990.58 905.23 934.27N 51.15E 935.67 N 3.13E 0.47 5299 98 32.9 4.7 5073.05 956.79 987.04N 55.49E 988.60 N 3.22E 0.41 5394 95 32.8 4.3 5152.86 1006.95 1038.41N 59.53E 1040.12 N 3.28E 0.25 5486 92 32.6 3.6 5230.28 1055.21 1088.00N 62.95E 1089.82 N 3.31E 0.46 5579 93 32.3 3.3 5308.75 1103.55 1137.81N 65.96E 1139.72 N 3.32E 0.37 PAGE 3 Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5674 95 32.2 2.6 5389.10 1152.55 1188.43N 68.57E 1190.41 N 3.30E 0.41 5768 94 31.9 2.6 5468.77 1200.69 1238.26N 70.83E 1240.29 N 3.27E 0.32 5955 187 32.4 3.6 5627.10· 1296.95 1337.62N 76.22E 1339.79 N 3.26E 0.39 60~ 94 32.8 4.3 5706.29 1346.12 1388.15N 79.71E 1390.43 N 3.29E 0.58 6141 92 33.0 -, 4.3 5783.53 1394.72 1437.98N 83.45E 1440.40 N 3.32E 0.23 6235 94 33.0 5.0 5862.36 1444.59 1489.02N 87.61E 1491.60 N 3.37E 0.41 6328 93 33.0 5.4 5940.34 1494.04 1539.48N 92.21E 1542.24 N 3.43E 0.23 6420 92 32.8 5.7 6017.58 1542.88 1589.22N 97.04E 1592.18 N 3.49E 0.29 6513 93 32.9 7.1 6095.71 1592.33 1639.35N 102.66E 1642.57 N 3.58E 0.82 6606 93 32.2 7.9 6174.11 1641.56 1688.96N 109.19E 1692.49 N 3.70E 0.88 6700 94 32.1 7.5 6253.69 1690.81 1738.53N 115.89E 1742.39 N 3.81E 0.25 6794 94 31.5 8.9 6333.58 1739.65 1787.56N 122.95E 1791.78 N 3.93E 1.01 6916 122 30.1 13.8 6438.39 1801.67 1848.77N 135.18E 1853.70 N 4.18E 2.35 PAGE 4 ..Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6983 67 29.1 16.3 6496.65 1834.72 1880.72N 143.76E 1886.21 N 4.37E 2.37 7077 94 28.6 17.7 6578.98 1880.07 1924.10N 157.02E 1930.49 N 4.67E 0.89 7171 94 29.0 18.0 6661.35 1925.36 1967.21N 170.91E 1974.62 N 4.97E 0.46 7266 95 29.3 18.8 6744.31 1971.63 2011.12N 185.52E 2019.66 N 5.27E 0.51 7358 92 29.1 20.2 6824.62 2016.49 2053.43N 200.50E 2063.19 N 5.58E 0.77 7453 95 29.0 20.9 6907.67 2062.58 2096.63N 216.70E 2107.79 N 5.90E 0.37 7546 93 29.6 22 . 6 6988.77 2107 . 98 2138 . 90N 233 . 57E 2151.61 N 6.23E 1.10 7639 93 29.5 23.0 7069.67 2153.67 2181.18N 251.34E 2195.61 N 6.57E 0.24 7733 94 29.8 24.7 7151.36 2199.91 2223.70N 270.15E 2240.05 N 6.93E 0.94 7827 94 29.8 26.8 7232.94 2246.17 2265.77N 290.44E 2284.31 N 7.30E 1.11 7921 94 30.3 28.9 7314.30 2292.51 2307.38N 312.44E 2328.44 N 7.71E 1.24 8015 94 30.6 29.3 7395.34 2339.22 2349.01N 335.60E 2372.86 N 8.13E 0.39 8108 93 31.3 30.4 7475.10 2385.99 2390.49N 359.41E 2417.36 N 8.55E 0.97 PAGE 5 Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 8200 92 31.3 31.4 7553.71 2432.54 2431.50N 383.96E 2461.63 N 8.97E 0.56 8295 95 31.2 32.1 7634.92 2480.37 2473.41N 409.89E 2507.14 N 9.41E 0.40 8389 94 31.6 34.6 7715.16 2527.54 2514.30N 436.81E 2551.97 N 9.86E 1.45 8483 94 32.5 36.3 7794.84 2575.06 2554.93N 465.75E 2597.03 N 10.33E 1.36 8577 94 33.8 36.0 7873.53 2623.84 2596.43N 496.07E 2643.40 N 10.82E 1.39 8671 94 35.2 36.3 7951.00 2674.37 2639.42N 527.49E 2691.61 N 11.30E 1.50 8764 93 36.6 36.7 8026.33 2726.02 2683.25N 559.93E 2741.05 N 11.79E 1.53 8856 92 36.7 38.8 8100.15 2777.63 2726.67N 593.54E 2790.52 N 12.28E 1.37 8950 94 35.8 39.1 8175.95 2829.47 2769.90N 628.48E 2840.30 N 12.78E 0.98 9045 95 35.6 40.2 8253.10 2880.92 2812.58N 663.85E 2889.86 N 13.28E 0.71 9144 99 35.6 40.2 8333.60 2934.19 2856.60N 701.05E 2941.36 N 13.79E 0.00 9238 94 35.7 40.9 8409.98 2984.71 2898.22N 736.67E 2990.38 N 14.26E 0.45 9338 100 35.3 42.7 8491.40 3037.76 2941.51N 775.37E 3041.99 N 14.77E 1.12 PAGE 6 Company: BP EXPLORATION, Well: W-23, Location: W-23PRUDHOE BAY - EILEEN WEST END, Riq: AUDI 3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 9422 84 34.9 43.4 8560.12 3081.44 2976.81N 808.34E 3084.61 N 15.19E 0.68 9519 97 34.6 44.1 8639.82 3131.15 3016.75N 846.57E 3133.28 N 15.68E 0.51 9702 183 33.8 44.8 8791.18 3223.08 3090.18N 918.60E 3223.82 N 16.56E 0.49 PAGE 7 TEL O Oilfield Senvices PLAN VIEX 36OO + 9702 + 9238 ' + 8856 8671 ' i 8483 8295 ' 8i08 792i 7733 ' 7546 ' 7358 ' 7171 ' 6916 ' 6700 ' 6513 ' 6328 ' 6141 5955 ' 5768 ' 5579 ' 5394 ' Ii 201 ' 502~ ' 4833 ' 4649 ' 4462 ' 4277 ' 089 ' 792 ' 9045 ' BP EXPLORATION X-23 W-23PRUDHOE BAY - EILEEN WI AUDI 3 JOB# 733TAK/O0 SCALE; 1 inch = 400 feet 32OO 2800 2400 2000 z 16oo C- 1200 800 ST END 400 400 400 80?ft) EAST 1200 1600 2000 0 2000 3O0O 4000 %~50 O0 LLJ n6000 >7000 8OOO 90OO 10000 ilO00 TELL.O Oilfield Services VERTICAL PROJECTION lO00 2000 3000 4000 5000 6000 2660' .5 deg BP EXPLORATION 2953 ' 2.9 deg W-23 W-23PRUDHOE BAY · 3231 ' 9.3 deg AUDI 3 35~I ' ~5.9 .~g JOB# 733TAK/O0 ~3792 ' 22.4 aeg SCALE: 4089 ' 28.7 deg ~ znch = 1000 S 4371 ' 28.8 deg 4649 ' 29.5 deg 4926 ' 3~.6 deg %520~ ' 32.5 deg 5486 ' 32.6 deg 5768 ' 31.9 deg 6049 ' 32.8 deg 6328 ' 33.01 deg 6606 ' 32.2 deg 6916 ' 30.1 deg $7171 ' ~9.01 deg 7453 ' 29.01 deg 7733 ' 29.8 deg 8015 ' 30.6 deg 8295 ' 31.2 deg 8577 ' 33.8 deg 8856 ' 36.7 deg %9~44 ' 35.6 deg - EILEEN feet W ST END VERTICAL SECTION (ft) GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY COMPANY WEST EILEEN # W-23 WELL NAME WEST EILEEN, ALASKA LOCATION DON LEJEUNE SUPERVISOR NAME T I TLE S I GNATURE 500 FT 9702 FT DEPTH INTERVAL FROM TO zz/~.z/89 z/6/9o DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL ICROFWLMED WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. GREAT L~a%~D DIRECTIONAL DRILLING,INC 1-11-90 Client .............. : BP EXPLORATION Well ................ : WEST EILEEN #W-23 Vertical Section at.: N 17.79 E Magnetic Declination: 30 deg 0 min E Data file name ...... : B:WW23D.DAT RECORD OF SURVEY (Well assumed vertical to MD of Computation: RADIUS OF CURVATURE Survey date: 12-22-89 Method ..... : MWD RKB Height.: 90.6 ft 0.0) MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 0 0 0 0.00 -90.61 0.00 N 0.00 E 0.00 N 500 0 0 500.00 409.39 0.00 N 0.00 E 0.00 N 1024 0 15 1024.00 933.39 -0.24 S 60.00 E 0.57 S 1176 0 15 1176.00 1085.39 -0.19 N 87.00 E 0.72 S 1294 1 0 1293.99 1203.38 0.80 N 19.00 E 0.01N 0.00 E 0.00 E 0.99 E 1.63 E 2.59 E CLOSURE DISTANCE DG MN S 0.00 N 0 0 0 E 0.00 N 0 0 0 E 1.14 S 60 0 0 E 1.78 S 65 59 26 E 2.59 N 89 52 30 E DOG LE deg/10· o.0o 0.00 0.04 0.00 0.63 1390 1482 1577 1672 1860 5 45 1389.80 1299.19 9 0 1481.02 1390.41 9 0 1574.85 1484.24 7 15 1668.89 1578.28 4 30 1855.89 1765.28 4.89 N 60.00 W 4.89 N 7.59 N 58.00 W 10.97 N 11.86 N 53.00 W 19.38 N 16.93 N 47.00 W 28.01 N 25.13 ~ 47.00 W ' ': 41.13 N 0.77 E 9.35 W 21.60 W 31.88 W · 45.95 W 4.95 N 8 56 29 E 14.41 N 40 26 51 W 29.02 N 48 5 17 W 42.43 N 48 41 33 W 61.67 N 48 9 52 W 5.01 3.53 0.12 1.84 1.46 2045 2229 2660 2766 2860 5 45 2040.15 1949.54 2 45 2223.62 2133.01 0 30 2654.42 2563.81 0 24 2760.42 2669.81 i 6 2854.41 2763.80 34.38 N 29.00 W 43.63 N 30.00 W 45.38 S 83.00 W 45.00 S 78.90 W 45.46 N 8.90 E 54.10 N 65.97 N 71.12 N 70.99 N 71.71 N 56.08 W 62.79 W 73.12 W 73.94 W 74.70 W 77.92 N 46 1 43 W 91.08 N 43 35 16 W 102.00 N 45 47 43 W 102.50 N 46 10 5 W 103.55 N 46 10 3 W 0.68 1.63 0.52 (' ~9 2953 2 54 2947.35 2856.74 3046 4 54 3040.13 2949.52 3138 7 6 3131.62 3041.01 3231 9 18 3223.66 3133.05 3325 11 30 3316.11 3225.50 48.67 N 8.20 E 54.94 N 13.10 E 64.55 N 18.40 E 77.81 N 15.90 E 94.76 N 14.50 E 74.92 N 81.14 N 90.39 N 103.06 N 119.44 N 74.21 W 73.05 W 70.44 W 66.53 W 62.08 W 105.46 N 44 43 41 W 109.17 N 41 59 46 W 114.59 N 37 55 41 W 122.67 N 32 50 32 W 134.61 N 27 27 49 W 1.93 2.15 2.39 2.36 2.34 3419 13 48 3407.82 3317.21 3511 15 54 3496.74 3406.13 3605 18 24 3586.56 3495.95 3699 20 42 3675.13 3584.52 3792 22 24 3761.63 3671.02 115.32 N 16.30 E 138.90 N 18.40 E 166.61 N 16.60 E 198.05 N 15.20 E 232.10 ~ 11.70 E 139.28 N 161.78 N 188.22 N 218.46 N 251.68 N 56.61W 49.58 W 41.25 W 32.63 W 24.69 W 150.35 N 22 7 11 W 169.21 N 17 2 19 W 192.68 N 12 21 39 W 220.89 N 8 29 42 W 252.89 N 5 36 7 W . 2.44 2.28 2.66 2.45 1.90 WEST EILEEN #W-23 1-11-90 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST 6794 31 30 6333.68 6243.07 1739.49 N 8.90 E 1787.21'N 6916 30 6 6438.47 6347.86 1801.55 N 13.80 E 1848.44 N 6983 29 6 6496.72 6406.11 1834.60 N 16.30 E 1880.39 N 7077 28 36 6579.06 6488.45 1879.95 N 17.70 E 1923.76 N 7171 29 0 6661.43 6570.82 1925.24 N 18.00 E 1966.87 N DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 123.54 E 135.83 E 144.42 E 157.68 E 171.56 E 7266 29 18 6744.40 6653.79 1971.51 N 18.80 E 2010.78 N 7358 29 6 6824.71 6734.10 2016.37 N 20.20 E 2053.09 N 7453 29 12 6907.67 6817.06 2062.59 N 20.90 E 2096.41 N 7546 29 36 6988.70 6898.09 2108.13 N 22.60 E 2138.82 N 7639 29 30 7069.60 6978.99 2153.82 N 23.00 E 2181.10 N 186.17 E 201.15 E 217.39 E 234.31 E 252.08 E 7733 29 48 7151.29 7060.68 2200.06 N 24.70 E 2223.63 N 7827 29 48 7232.86 7142.25 2246.33 N 26.80 E 2265.70 N 7921 30 18 7314.2'3 7223.62 2292.67 N 28.90 E 2307.32 N 8015 30 36 7395.26 7304.65 2339.46 N 28.30 E 2349.14 N 8108 31 18 7475.02 7384.41 2386.32 N 30.40 E 2390.83 N 270.88 E 291.18 E 313.17 E 335.97 E 359.41 E 8200 31 18 7553.63 7463.02 2432.87 N 31.40 E 2431.84 N 8295 31 12 7634.85 7544.24 2480.70 N 32.10 E 2473.75 N 8389 31 36 7715.08 7624.47 2527.87 N 34.60 E 2514.66 N 8483 32 30 7794.75 7704.14 2575.40 N 36.30 E 2555.29 N 8577 33 48 7873.45 7782.84 2624.10 N 36.60 E 2596.64 N 383.96 E 409.89 E 436.81 E 465.74 E 496.28 E 8671 35 12 7950.92 7860.31 2674.54 N 36.30 E 2639.46 N 8764 36 36 8026.25 7935.64 2726.19 N 36.70 E 2683.30 N 8856 36 42 8100.06 8009.45 2777.81 N 38.80 E 2726.72 N 8950 35 48 8175.86 8085.25 2829.64 N 39.10 E 2769.94 N 9045 35 36 8253.01 8162.40 2881.09 N 40.20 E 2812.63 N 527.91 E 560.35 E 593.97 E 628.91 E 664.28 E 9144 35 36 8333.51 8242.90 2934.37 N 40.20 E 2856.64 N 9238 35 42 8409.89 8319.28 2984.89 N 40.90 E 2898.27 N 9338 35 18 8491.30 8400.69 3037.93 N 42.70 E 2941.56 N 9422 34 54 8560.03 8469.42 3081.61 N 43.40 E 2976.86 N 9519 34 36 8639.73 8549.12 3131.33 N 44.10 E 3016.80 N 701.48 E 737.10 E 775.80 E 808.77 E 847.01 E CLOSURE DISTANCE DG MN S 1791.47 N 3 57 15 E 1853.42 N 4 12 10 E 1885.93 N 4 23 31 E 1930.22 N 4 41 9 E 1974.34 N 4 59 6 E 2019.38 N 5 17 23 E 2062.92 N 5 35 44 E 2107.66 N 5 55 13 E 2151.61 N 6 15 7 E 2195.62 N 6 35 34 E 2240.07 N 6 56 44 E 2284.34 N 7 19 24 E '2328.47 N 7 43 46 E 2373.05 N 8 8 21 E 2417.70 N 8 32 57 E 2461.97 N 8 58 20 E 2507.48 N 9 24 30 E 2552.31 N 9 51 16 E 2597.39 N 10 19 47 E 2643.64 N 10 49 12 E 2691.74 N 11 18 37 E 2741.18 N 11 47 44 E 2790.66 N 12 17 20 E 2840.44 N 12 47 31 E 2890.01 N 13 17 19 E 2941.51 N 13 47 48 E 2990.53 N 14 16 9 E 3042.14 N 14 46 29 E 3084.77 N 15 11 59 E 3133.44 N 15 40 58 E DOG LE deg/10 ,. 0.75 1.52 1.73 o 0. -~$ 0.37 0.42 0.20 0.62 0.15 0.54 0.55 0.77 0.35 0.96 .29 ~2 i .09 .38 1.49 1.51 0.82 0.96 0.44 0.00 0.27 0.72 0.54 0.38 WEST EILEEN #W-23 1-11-90 RECORD OF SURVEY m mmm MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE COORDINATES DEPTH DG MN DEPTH DEPTH DIST ANGLE FROM WELL-HEAD m 9702 33 48 8791.08 8700.47 3223.25 N 44.80 E 3090.22 N 919.04 E DISTANCE mmmmmmmmmmmmmm mmmmmmmmmm CLOSURE DOG LE DG MN S deg/10 3223.99 1~ 16 33 45 E 0.45 WEST EILEEN #W-23 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 1-11-90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 91 91 0 0 0 191 191 100 0 0 291 291 200 0 0 391 391 300 0 0 491 491 400 0 0 591 591 500 0 0 691 691 600 0 0 791 791 700 0 0 891 891 800 0 0 991 991 900 0 0 1091 1091 1000 0 0 1191 1191 1100 0 0 1291 1291 1200 0 0 1391 1391 1300 0 0 1492 1491 1400 1 1 1593 1591 1500 1694 1691 1600 1794 1791 1700 1895 1891 1800 1995 1991 1900 2096 2091 2000 5 1 2196 2191 2100 5 0 2296 2291 2200 5 0 2396 2391 2300 5 0 2496 2491 2400 5 0 2596 2591 2500 5 0 2696 2691 2600 5 0 2796 2791 2700 5 0 2896 2891 2800 5 0 2996 2991 2900 5 0 RELATIVE COORDINATES FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.10 S. 0.17 E 0.21 S 0.36 E 0.32 S 0.55 E 0.43 S 0.74 E 0.54 S 0.93 E 0.64 S 1.27 E 0.63 S 1.75 E 0.02 S 2.57 E 4.94 N 0.68 E 11.83 N 10.60 W 20.83 N 23.32 W 29.53 N 33.51 W 36.55 N 41.04 W 43.58 N 47.86 W 50.62 N 53.36 W 57.37 N 57.93 W 63.83 N 61.59 W 66.77 N 64.40 W 67.96 N 66.80 W 69.16 ~ 69.19 W 70.35 N 71.59 W 71.07 ~ 73.40 W 71.22 N 74.18 W 72.96 N 74.51 W 77.82 ~ 73.67 W WEST EILEEN #W-23 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 1-11-90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT mmmtmm 3097 3091 3000 6 1 3198 3191 3100 7 1 3299 3291 3200 8 1 3401 3391 3300 10 2 3505 3491 3400 14 4 3609 3591 3500 18 4 3716 3691 3600 25 7 3824 3791 3700 33 8 3934 3891 3800 43 10 4047 3991 3900 56 13 4160 4091 4000 69 13 4274 4191 4100 83 14 4388 4291 4200 97 14 4502 4391 4300 111 14 4616 4491 4400 125 14 4732 4591 4500 141 16 4848 4691 4600 157 16 4965 4791 4700 174 17 5083 4891 4800 192 18 5201 4991 4900 210 18 5320 5091 5000 '229 19 5439 5191 5100 248 19 5558 5291 5200 267 19 5676 5391 5300 285 18 5794 5491 5400 303 18 5912 5591 5500 321 18 6030 5691 5600 339 18 6149 5791 5700 358 19 6269 5891 5800 378 20 6388 5991 5900 397 19 mmmmmmmmmmmmmmm RELATIVE COORDINATES FROM WELL-HEAD 86.24 N 71.61 W 98.51 N 67.93 W 114.92 N 63.30 W 135.56 N 57.64 W 160.23 N 50.07 W 189.60 N 40.85 W 224.41 N 31.21 W 264.15 N 22.18 W 309.70 N 13.24 W 361.00 N 4.82 W 414.86 N 1.63 E 469.13 N 7.08 E 523.58 N 12.70 E 577.95 N 18.37 E 632.72 N 24.10 E 689.32 N 29.59 E 748.32 N 34.61 E 809.23 N 39.64 E 871.20 N 45.01 E 934.18 N 51.00 E 998.19 N 56.69 E 1062.44 N 61.51 E 1126.14 N 65.57 E 1189.23 N 68.92 E 1251.82 N 71.88 E 1314.58 N 1378.00 N 1442.41 N 1507.05 N 1571.44 N 75.28 E 79.32 E 84.13 E 89.66 E 95.92 E WEST EILEEN #W-23 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 1-11-90 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 6507 6091 6000 416 19 6625 6191 6100 434 18 6743 6291 6200 452 18 6860 6391 6300 469 17 6976 6491 6400 485 16 7090 6591 6500 499 14 7204 6691 6600 513 14 7319 6791 6700 528 15 7433 6891 6800 542 14 7548 6991 6900 557 15 7663 7091 7000 572 15 7778 7191 7100 587 15 7894 7291 7200 603 16 8010 7391 7300 619 16 8126 7491 7400 635 16 8243 7591 7500 652 17 8360 7691 7600 669 17 8478 7791 7700 687 18 8598 7891 7800 707 20 8720 7991 7900 729 22 8844 8091 8000 753 24 8968 8191 8100 777 24 9091 8291 8200 800 23 9214 8391 8300 823 23 9337 8491 8400 846 23 9459 8591 8500 868 22 9581 8691 8600 890 22 RELATIVE COORDINATES FROM WELL-HEAD 1635.67 N 1698.83 N 1760.78 N 1820.47 N 1877.04 N 102.86 E 111.15 E 119.73 E 130.21E 143.52 E 1929.81 N 1982.31 N 2035.12 N 2087.50 N 2139.82 N 159.63 E 176.70 E 194.79 E 214.05 E 234.73 E 2192.04 N 2243.91 N 2295.24 N 2346.74 N 2398.97 N 256.92 E 280.67 E 306.78 E 334.66 E 364.28 E 2450.92 N 2502.18 N 2553.18 N 2606.12 N 2662.56 N 395.77 E 428.60 E 464.24 E 503.29 E 545.00 E 2721.16 N 2778.10 N 2833.19 N 2887.76 N 2941.19 N 589.66 E 635.67 E 681.66 E 728.11 E 775.47 E 2992.18 N 3041.48 N 823.44 E 871.22 E WEST EILEEN #W-23 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH 1-11-90 MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH -- 1000 1000 909 2000 1995 1904 3000 2994 2903 4000 3949 3858 5000 4820 4729 6000 5665 5574 7000 6512 6421 8000 7382 7291 9000 8216 8125 RELATIVE COORDINATES FROM WELL-HEAD -- 0.55 S 0.94 E 50.95 N 53.62 W 78.06 N 73.62 W 339.19 N 8.04 W 827.59 N 41.19 E 1361.66 1888.24 2342.47 2792.41 78.19 E 146.82 E 332.33 E 647.53 E 500 1000 t500 2000 2500 3000 3500 T 4000 V 4500 D 5000 5500 6000 VERTICAL SECTION BP EXPLORATION NEST EILEEN #N-23 SECTION AT N i7.79 E TVD SCALE: i inch = 1000 feet DEP SCALE: i inch" lO00 feet DRANN : i-il-90 Harker Identification HD TVD DEPRT A} KB 0 0 0 B} TD 9702 879t 3223 6500 7OOO 7500 BO00 BSO0 90O0 -500 500 tO00 1500 ;~000 3500 3000 3500 4000 4500 5000 5500 Departure kJ KB HD Tvn [)EPRT 0 0 0 9702 879t 3223 PLAN VIEW BP EXPLORATION WEST EILEEN #W-23 CLOSURE: 3224 ft N 16.6 E DECLINATION: 30.00 deg E SCALE: 1 [rich = 500 feet DRAWN: i-i1-90 3250 3000 2750 2500 225O 2000 t750 i500 i250 tO00 750 5OO 25O i500 1~50 1000 750 5O0 2~0 2~0 .qO0 750 1000 t250 tSO0 AOGCC GEOLOGICAL MATERIALS INVENTORY LIST PERMITN ~o~ _ ~ WELL NAME /P~ COMP! FTION DATE .~ I'''35'' I ? o CO. CONTACT 8; NO. fo rm re ce lye d re ce lye d d ate co m m e nts 407 no ' completion report O 403 yes no sundry application 404 yes no report of sundry application Open' required received Cased requ~;~d received'~r-0duCtior:required received hole log hole !o9 MUD A//o / GCT TEMP DII_/SFL ~ / CNL PROD v/ , , DLL CBT PRESS BHCISL CET SPINNER BH~¥AC ,,// .,,-'~'~ EPT O~HER DATA LSS PERF ,.~ 3 ...-'~' Survey REC SSS PACKER Di git~l~ $ ~'~/ Data FD C- It,, ; Test~ CNL L-,~. FDC RWD required received SAMPLES required rccCivc'd MWD ~T=~. C N L v.~ ~ dry ditch ML core CYBER core LOOK Analysis " NGT ' BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON MOBIL PHILLIPS ~,ST~TE OF ana~a-'-h GEOSCIENCES ARCHIVES DATE: 01/12/90 T%: 80782 BP OPEN HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-23 BHCS 01/08/90 91 9762-10171 Atlas 2"/5" W-23 CNL 01/08/90 #1 7300-10142 Atlas 2"Y5" W-23 DIFL 01/08/90 #1 9762-10200 Atlas 2"/5" .' W-23 BOREHOLE PROFILE 01/08/90 #1 9762-10201 Atlas ' 5" GESO/ARCO/EXXON/ARCHIVES ONLY .... W-23 SS TVD 01/08/90 91 8750-9150 Atlas 1"/2" STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: JobS: JobS: Information Control Well Records LR 2-1 J. Dietz/S. McCurry RECEIVED I~,~,Y - 4 1990 Alaska Oit & Gas (;oas. commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 03/16/90 Transmittal: 80941 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL .LOGS Enclosed is your copy of the material questions, please contact BP Well Records C-21 TEMP 03/03/90 #1 C-25 TEMP 02/28/90 #1 J-14 PROD-F 03/05/90 #1 Q-01 PROD-F 03/06/90 #1 R-18 TEMP 03/04/90 #1 W-~6 PROD-F 03/01/90 #1 W-23 LEAK DET. 02/27/90 #1 W-~I~3 LEAK DET. 03/03/90 #1 listed below. If you at (907) 564-4445. 8950-9191 Camco 10000-10223 Camco 10250-10527 Camco ~9250-9650 Camco ~700-1005~ Camco 13050-13321 Camco ~-10100 Camco 9700-10100 Camco have any 5" 5" 5" 5" 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR RECEIVED BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (9073 561-5111 To: Distribution Date: 03/12/90 Transmittal: 80969 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-34 Prod-F 03/02/90 #1 9332-9577 Sch 5" C-36 Prod-F 03/03/90 #1 9650-9899 Sch 5" H-16 Completion 03/06/90 #1 9797-10020 Sch 5" J-15 Perf 03/04/90 #1 11100-11334 Sch' 5" W-03 Perf 03/06/90 #1 9190-9876 Sch 5" W-23 Perf 03/0.7/90 #1 9850-10116 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOBIL PHILLIPS RESERVOIR ARCHIVES BP EXPLORATION February 22, 1990 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commi:;sion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well W-23 (42-16-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form ]0-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustain~ent work on the well. Yours very truly, C. J. A. Lewis Supervisor Peripheral & EOA CJAL:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File (Form 10-403 faxed to Mike Minder, AOGCC~ 2/22/90, for verbal approval) STATE OF ALASKA ~SKA OIL AND GAS CONSERVATION COMb. -~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon . Suspend ~ Alter casing Repair well Change approved program 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 556' SNL, 1179' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2660' SNL, 175' WEL, SEC. 16, T11N, R12E, UPM At effective depth 2542' SNL, 80' WEL, SEC. 16, TI 1N, R12E, UPM At total depth 2521'SNL, 63'WEL, SEC. 16, T11N, R12E, UPM 12. Present well condition summary Total depth: measured 10200 feet true vertical BKB 9203 feet Operation Shutdown ~ Plugging ~ Pull tubing Variance ~ 5. Type of Well: Development Exploratory StratJgraphic Service Re-enter suspended well Time extension Stimulate Perforate ~ Other ~ 6. Datum elevation (DF or KB) KBE, 90.61 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-23 (42-16-11-12) PBU 9. Permit number 89-128 10. APl number 50- 029-21993 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Magna Range bridge plug at 10500' MD Effective depth: measured 10150 feet true vertical BKB 9160 feet Junk (measured) Casing Length Structural -- Conductor 110 Surface 2642 Intermediate 9730 Production -- Liner -- Perforation depth: Size Cemented Measured depth True vertical depth BKB 2O 146 146 13 3/8 3723 c.f. 2678 2673 9 5/8 2018 c.f. 9766 8835 measured Open-hole completion w/isolated pay intervals: 9882'-9919', 9940'-9953', 9973-9994' RECEIVED true vertical subsea 8842'-8937' (three intervals) FEB 2 6 Tubing (size, grade, and measured depth) 3 1/2" L-80 to 10171' ~l~$ka OJ~ & Gas C0115~ ComffiJssloli Anchora~ Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9475'; external casing packers at 9861', 9919', 9953', 9994'; 3 1/2" SSSV at 2099' 13. Attachments Description summary of proposal × Detailed operations program ~ BOP sketch × 14. Estimated date for commencing operation I 15. Status of well classification as: February 1990 16. If proposal was verbally approved Oil X Gas ~ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~,.,> Title supervisorPerpheral& EOA FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Suspended~ Date Z/~.~./ffc, ~,,.,~oproval No. ~mmissioner Date Plug integrity ~ BOP Test~ Mechanical Integrity Test Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required 10- 4 c.. ~/ ORIGINAL SIGNED BY t n.l~nr C, e~'IITH SUBMIT IN TRIPLICATE W-23 Tailpipe Completion NRWO Procedure February 21, 1990 Note: No primary cement was performed on this well. Zone isolation was to be effected by external casing packers. It now appears that the packers are not providing the isolation and this squeeze is designed to shut off water being produced from below the OWC. 1. RU. Slickline. Pull SSSV. Blank off GLM's. 1 Close top sliding sleeve. Pressure test to ensure that all sleeves are closed prior to squeeze. 3. RU Coil Tubing unit. RIH and determine PBTD. 4. Circulate out gas as required. 4. Install Biozan Polymer system to cleanout well. 5. Clean out to Magna-Range bridge plug at 10150' MD BKB. 6. Perforate from 10020'-10040' MDBKB at 4 SPF. . Squeeze with Class G cement with 35% silica flour. Use hesitation technique as required to achieve a squeeze. Use retainer if necessary. . WOC 12 hours. Pressure test to 2000 psi. Resqueeze if necessary. 9. RU. Slickline. Install GLM's. 10. Open top sliding sleeve and well put on production. 11. Perform well test. 12. Run production logs. If it is determined that cement has covered some of the productive interval, that interval will be perforated. Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams Chicksan (Kill Line) Slips ~===~ Pipe Rams Pump-In Sub (C ircula te/R e turns) W ell Head Swab Valve RECEIVELt ~ .,,, ~ Anchorage UNIT Lc~cstt'an: _ F~AC-E3 TO FOLLOW , fca Net Include Ccver 5E, DUR/TY CLA~,IFiCATilON MAT-'~L~-JTM FAX ~IACHINI~ _. ~_ i i Il _L,' · EXPLORATION February 22, 1990 F~. BOx 1~1~ Art(~horage, Alaska 9951g-6612 Alaaka 0il & Gas Conservation Commicsion 3001 POrCupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V..Chatterton Well w-23 (42-16-11-12) PBU Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal tO perform rem~dlal/oapaoity sustainment work on the well. YoUrs very truly, C. J. A. Lewis Supervisor Peripheral & EOA CJAL:JAM Enclosures (9) cc: L, Burke (MB12-1) Well File (Form 10-403 faxed to Mike Minder, AOGCC, 2/22/90, for verbal approval) STATE OF N.A~KA ALASKA OIL AND GA~ CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abaneon ~ne Ol~mlio~ ahutdewn ,, R~enw sua~d well__ 3. ~dreel ~r~lo , 6. Datum elevation (DF or KB) KBE - 90J1 AMSL feet "' ?~-unit or Property name Prudh~e Bay Unl~ W. ES (42.1~,1f.1~) PBU 9. Permit number i0, APl number --:'"'"~ ........ ' 50- 0£9.~_1993 ......... L ..... I 11, Fleld/P~l Pmdhoe 0/I Pool measured 1~00 feet true vedtoal 8/~ g~ feet Piu~ (measured) Megna Range bridge plug at 10600'MD Effective depth: measured 10160 feet true vertical BKB 9160 feet Junk (measured) Casing Length 81ze Oemented Measured depth True vertical depth Structural - BKB Conductor f 10 .20 146 146 Surf aDa ~64~ 13 3/~ 3723 o.f. 28,78 2673 Intermediate 9730 Production Liner Perforation depth: measured Open.hole ~mplefton w4selated pay Inte~a/s: 9882'.9919', 9940'-~', 9973-9994 true vertical aubeea 884g'-8~7' (~hree ht~vat~) Tubing (size, grade, and measured deplh) 3 I/2'L.aO to 10171' Packere and 855V (type and measured depth) 9 6/8', TlW packer at g476~, external ca, lng packem at g861; 9919', gg53; 9994'; $ I/2 SSSVatEOgg' 13. Attaeh~nents .... Deacriptton ~ummaw of pro~ai-~- DetaJieci-~ratione I~ogram .... , ...... -BOI~ sketch. ~ ~i'4,'Eai~i;ted date for oommenci~-6per~tlon Febma/7 1t3~0 N~e ~ ~ov~ Date ~mv~ Sew~e ~ i '~7~-J here~ m~ t~a ~e f~r~ i~ tme a~ m~ lo the best ~ my kmwledge, FOR C~~I~ UgE ~Y ~bni' 0f ~mval: ~ ~mlesbn aD r~meemm~e may w~n~e J~ Statue of Well classification aa: Suspended. Plug Integrity..___ BOP Teat.,__ Lcd. etlon clearance ._.._. Mechanical Integrity Test ~_._ Sul~equent form required 10-. i o va{ No': .................. " ........ , la .......... __~._ red by order of the Comml~ton Form 10-403 Rev 06/IMt6 CommlasIoner Date SUBMIT IN TRIpi.-i~;-~,~E- Note: No prlrrmry cement ws. performed on this well. Zone Isolstlon was to be effected by externsl oaelng packera, It now sppears thst the pa~kera are not providing the I~olatlon Ind this squeeze It designed to shut off water being produced from below the owe. 2~ . 1 e . , 7~ . 1 RU. Slickline. Pull SSSV, Blank off GLM's. Close top sliding sleeve. Pressure test to ensure .that all sleeves are closed prior to squeeze, RU Coil Tubing unit, RIH and determine PBTD. Cimulate out gas as required. Install Biozan Polymer system .to cleanout well, Clean out to Magna-Range bridge plug at 10150' MD BKB. Perforate from 10020'-10040' MDBKB at 4 SPF, Squeeze with Class G cement with 35% silica flour, Use hesitation technique as required to achieve a squeeze, Use retainer If necessary, WOO 12 hours. Pressure test to 2000 psi, Resqueeze if necessary. RU. Slickline. Install GLM's. 10. Open top sliding sleeve and well put on production, Perform well test. 12, Run production logs, If it is determined that cement has covered some of the productive interval, that interval will be perforated. Coiled Tubing Blow*Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line) Slips Pipe Rams Pump-In Sub (C Ircula t e/R e turns) W ell Head Swab Valve BP EXPLORATION BP Exploration (Alaska) Inc. gOO East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 02/12/90 Transmittal: 80902 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have questions, please contact BP Well Records at (907) 564-4445. any C-04 Casing Cutter 02/03/90 #1 8790-9514 Sch 5" C-15 TCP Gun/Packer 02/06/90 #1 9152-9702 Sch 5" C-15 PERF 02/04/90 #1 9152-97~ Sch 5" J-03 LEAK DET. 01/30/90 #1 9690-10066 Sch 5" M-07 PROD-F 02/07/90 #2 8150-9880 Sch 5" M-14i PERF 02/05/90 #1 10300-10733 Sch 5" W-19 CBT 02/02/90 #1 10500-11426 Sch 5" W-19 CET 02/02/90 #1 _10500-11445 Sch 5" W-19 PERF 02/02/90 #1 10680-11424 Sch 5" W-23 PROD-F 02/03/90 #1 9700-9958 Sch 5" Distribution: ARCO CHEVRON EX/fON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ~A~E OF ALASK~b ARCHIVES RECEIVED F E._F] 2.1. (Iii & ~as Co:is. commissio.~ A~]cl]0rage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO ARCO EXXON PHILLIPS STATE OF ALASKA Date: 01/19/90 T#: 80784 SYSTEH Tape & Transmittal 0nly ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. OPEN HOLE: W-23 0H/DIFL/BHC/CN Atias#4i46 01/08/90 #- 7286-10226 ib00bpi API#50-029-21993 Tape Pos.#06889 This is a corrected tape to replace the one sent to you on Jan, 15 1990. Information Control Well Records LR2-1 J. Dietz/S. McCurry RECEIVED ;~iash Oil ~ ~ Cons. ¢ommi~l~ll~ AnchoragO BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 01/18/90 CHEVRON T#: 80786 EXXON MOBIL PHILLIPS GEOSCIENCES ARCHIVES BP OPEN HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-23 Mudlog 01/08/90 #- 9773-10200 NL Baroid 2" , lVE D .0il '~ ~;~s Cons. Co. mmlssl0.~ Anchorage STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To ARCO EXXON PHILLIPS Date: 01/15/90 T#: 80784 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. OPEN HOLE: W-23 OH/DIFL/BHC/CN/GR 01/08/89 %- 7286-10226 Atlas%4146 1600bpi API%50-029-21993 CASED HOLE: B-28 CH/TDT~P Borax 12/29/89 #1 10596-11345.5 Sch%73626 1600bpi AAPI%50-029-21510 ARCHIVES ONLY: Tape Pos.%06889 Tape Pos.#06890 B-28 CH/TDT-P Borax field tape 12/29/89 %1 Sch%73626 1600bpi API#50-029-21510 Tape Pos.#06919 Information Control Well Records LR2-1 J. Dietz/$. McCurry -'"MEMORANDdM State of Alaska TO: Lonnie C :'Smit DATE: January 4, 1990 Commissioner mLENO: D.BDF.100 THRU: FROM: Michael T Minder ~' ~~' Sr Petroleum Engineer Bobby D Fos~ter\~'/ Petroleum Inspector TELEPHONE NO: SUBJECT.' BOP Test BPX PBU W-23 Permit #89-128 Prudhoe Oil Pool Thursday., De_¢embe~.28,_1989: The test began at ll:00pm and was concluded at i:00am 12/2-9789. As the attached BOP test report shows, there was one failure. The accumulator did not maintain 200 psig above precharge pressure, and I requested the precharge pressure be checked in the accumulator bottles and myself or the AOGCC office be notified when completed. ~ In summary, I witnessed the BOP test on Audi Rig/on BPX W-23. Attachment Saturday, December 30, 1989: John Salario notified me this date that {h~ pr&~harge 'press~re-'in ~he accumulator bottles had been checked, found to be low, and had been pressured up to 1000 psig, and the unit now functioned properly. -- BF. 02-001A (Rev. 8/85) ' '~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report Rig # Location (general) / Well sign General housekeeping Reserve pit Vi sual Audio MUD SYSTEMS: Trip tank Pit gauge Flow monitor Gas detectors BOPE STACK: Annular preventer Pipe rams Blind rams Choke line valves HCR valve Kill line valves Check valve DATE ACCUMULATOR SYSTEM: Full charge pressure Press after closure Pump incr clos press 200 psig -- min .. min psig. Full charge press attained / Controls: Master ! Remote/~/'(~' Blind switch cover~'-~,~.~ ! KELLY AND FLOOR SAFETY VALVES: Upper Kelly / Lower Kel 1 y / Test P~essure ~.~-.~ ,/~.,~ Inside BOP / ~ .~ Cho~ m~n~o~ ~/1~ ~ ,, Number valves . ~/,. --~ ,, ,, Adjustable chokes ~ Hydraulically operated choke ft psig psig sec sec TEST RESULTS: Failures / Test time .~_~ ht's Repair or replacement of failed equipment to be made within and Inspector/Commission office notified. days Distribution: orig - AOGCC c - Operator c - Supervisor .~OOq (rev 03/J?/89) Inspector:[ JAN-- TUE ALASKA UNIfieD D~G, INC. December 13, 19S9 Telecopy: (907) 276-7542 G. W. Kirton PBU Lead Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 ~nchorage, Alaska 99519-6612 Prudhoe Bay Unit W-23 BP Exploration (Alaska) inc. Permit No. 89-128 Sur. Loc. 556'SNL, l179'WEL, Sec. 21, TllN, R12E, U~4 Btmhole Loc. 2676'SNL, 158'WEL, Sec. 16, TllN, R12E, UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to. drill does not exempt you from obtaining addigional permits required by law from other, governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior co commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness tesning of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Co~ission may witness testing before drilling below the shoe of the conductor pipe. BY ORDER OF THE CObR4ISSION dif Enclosure Depargment of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 December 8, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton W-23 (43-16-11-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above-named well. Also included are the attachments listed on the application form, and a check in the amount of $100 to cover the permit filing fee. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH CC Richard Smith Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.0O5 la. Type of work Drill [] Redrilll-Illb. Type of well. ExploratoryF1 Stratigraphic TestF1 D~Velopment OillZl Re-Entry [] DeepenI-Ii Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and pOol BP Ex~lor~tion KBE = 92 feet Prudhoe Bay Field/Prudhoe 3. Address i6. Property Designation Bay Pooi P, O. BOX..196612. Anchorage. Alaska 99519-6612 ADL 28263 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 556' SNL, 1179' WEL, SEC 21, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2782' SNL, 192' WEL, SEC 16, T11N, R12E W-23 (43-16-11-12) 2S100302630-277 At total depth 9. Approximate spud date Amount 2676'SNL, 158' WEL, SEC 16, T11N, R12E December24, 1989 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property lb. Proposed depth(UDandTVD) property line ADL 28261 @2676 feet W-24 @3142'/14.2 feet 2560 10054'MD/9197'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth 2800 feet Maximum hole angle 30o Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. 80' Surface 110' 110' ,, 17-1/2" 13-3/8" 68# L-80 Butt 2650' Surface 2680' 2680' 3723 cu fl Coldset II , . 12-!/4" 9-5/8" 47# NT80-S NSCC 9631' Surface 9661' 8856' 2018 cu fl Class G 8-1/2" 5-1/2" 17# L-80 NSCC 643' 9411' 8640' 10054' 9197' 285 cu ft Class G ,, 191 To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor f~*'~ ? ~' ~''' ~ ....... Surface .- Intermediate Production '~ ('''' !'~' ~.:~ Liner Perforation depth: measured .... .~,,' .,,' true vertical ~:~ -- · - 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] .Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed reportl-I 20 AAC 25.050 requirements r-I 21' I herebT'~certify~re~e and cOrrect tO the best Of my knOwledgO Signed ~ Title PBU Lead Engineer Date ' ~' ' Commission Use Only ~'ermit Number number I ISee cover letter I or o,,.r 6'~-- ,~.~ 150. oq,?- ConditiOns of approval Samples required [] Yes I~ No Mud log required []yes ,[~I. No Hydrogen sulfide measures [] Yes I~. No Directional survey requ~re~ ,~ Yes [] No Other: ' ' by order of Co ,s,,on r Form 10-401 1-85 Submit PROPOSED DRILLING AND COMPLETION PROGRAM WELL W-23 [4:3-16-11-121 PBU Tailr~ir~e Completion - - Install and cement 80' of 20" conductor to surface. The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 17- 1/2" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 9.5 ppg water base mud in the 8-1/2" hole. Directionally drill 17-1/2" hole (a surface nudge is required to avoid well W-24) to 2700' MD and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point 60' below the top of the Shublik formation. Run 9-5/8" 47# NT-80S NSCC casing to within 5' of 12- 1/4" TD and cement using Class G cement around the 9-5/8" shoe. Drill 8-1/2" hole to TD. Run open hole logs and if appropriate run tailpipe tubing completion, incorporating external casing packers and sliding sleeves for slective zone isolation and production. A 9-5/8" production packer will be run on the 3.5" tubing. A subsurface safety valve with dual control lines will be placed 200' below base of permafrost. Install and test Xmas tree. Release Rig. Rig up Coiled Tubing Unit and inflate the external casing packers with cement. Reverse out cement to PBTD. Rig down the CTU and bring the well on production by opening the sliding sleeves with a slick line unit. If the open hole logs or hole conditions dictate running a liner, a 5 1/2" liner will be run from TD to 250' inside 9-5/8" casing shoe and cemented using Class G cement. Clean out to 5 1/2" float equipment. Change over to 8.9 ppg. filtered NaC1 completion fluid. Test casing and lap to 3000 psi. Run CET/CBT/CCL-GR and GYRO. Perforate with wireline conveyed guns. Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13-3/8" annulus of the well. Tubing Size: 3-1/2", 9.2# L-80 TDS TBG with GLM's. NOTE: Perforate with rig on location if tailpipe completion not run. RIS Dec. 5th, 1989. PROPOSED DOWNHOLE DIAGRAM WELL W-23 [43-16-11-12] PBU/EWE TAILPIPE COMPLETION PROPOSED DEPTH BKB 20" Conductor 110' Ball Valve 2100' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 2700' 3-1/2" 9.2/$ L-80 TDS robing with GLM's 9-5/8" Packer 9400' 9-5/8" Shoe 12-1/4" Open Hole 3 1/2"9.2# L-80 TDS Tubing 9661' 9666' External Casing Packer Sliding Sleeve GOC ~LOC SHALE ~LOC OWC 3-1/2" Tailpipe Float Shoe 8-1/2" Open Hole 10030' 10054' · RIS-' '" i~ ' ': ...... ' ' : Dec,'Z~th;' I989 PROPOSED DOWNHOLE DIAGRAM WELL W-2;~ [4;~-16-11-121 PBU/EWE CONVENTIQNAL COMPLETION PROPOSED DEPTH BKB 20" Conductor 110' Ball Valve 2100' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 2700' 3-1/2" 9.2# L-80 TDS robing with GLM's 9-5/8" Packer 9361' 5 1/2" Liner 9411' 9-5/8" Shoe 12-1/4" Open Hole 9661' 9666' 5 1/2" 17# NT-80S NSCC Liner 5 1/2" PBTD 5 1/2" Liner Shoe 8-1/2" Open Hole 10014' 10054' 10054' RIS~.~c. 4th, 1989 B.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK 5000 PSi WP DRILLING ANNULAR PREVENTER ,I I, I PIPE RAMS I BLIND RAMS 2 IN. KILL LINE GATE GATE DRILLING SPOOL I PIPE RAMS ' 'I I 4 IN. CHOKE LINE HAND HYD. ASST. GATE GATE NORTH WELL N® W' 2:5 11 SURFACE LOCATION LAT. ' 70° 17' 55. 850" LONG, Y = 5, 959 , 700.86 A.S.P. X · 612 ,0q, 8.92 ZONE 4 556' FRO¥ N. LINE SECT. 2~ 1179' FROM E. LINE SECT. 2~ CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I AM II'IqOPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF &J.&SKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AM~ THAT ALL DIMENSIONS AND OT.ER DETAILS ARE COR.ECT. SURVEYOR D~TE: SCALE; · L ] j (MILES .WELL PAD'W' i IELL N° W- 25 AS-IUILT LOCATED I~ PROTRACTED SECT. ti ~ T. II II. ~ R. I~ E. , U.M. IURYEYED FOR : ALASKA ~TIOr', 30 PREPARED. IY ; KUUKPIK - TECHNICAL ~ERV. INC. PRUDHOE lAY OFFICE DATE ~ NOV, 15, 86 IN. AWN BY: B.T. CH KC). IY; R.H. WELL PAD, "W" SCALE 1":400' ~ OF WELL PAD REV. e REV. 5/18/88 JJC 12/08/87 JJC T. II N., R. 12 E.,O.M. 16 15 21 22 ,i (AS STAKED) PAD "W" Located in PROTRACTED SECTION ~.1, T. I IN.,R,12. E.~UMIATMERIDIAN,AK. Surveyed for ST~ND~RD ALASKA I::::RODUCTJON CO. Surveyed by i KUUKPIK TECHNICAL SERVICES, INC. i · ANCHORAGE, ALASKA (907-) 561-5257 ~ _ ii II LEGEND · EXISTING CONDUCTOR BOX o FUTURE CONDUCTOR BOX _m4$DUA12.4~ [DRANO2.5]W2.3_CLOSAP_SHORT7. LIS~ 2. 4-DEC-1989 14'30 Page i 'r--Closest Approach Analysis --- Date: 4-DEC-89 Time: 14: 29:57 ....... ~,-;Y--~-'~ -'~';-di-~-~-z-~°-O-- ....... -~--~'~-~-L-~%~'-~ ~-~'~ Fo~ p~oposed well: W-23 [43-16-iI-1~] Location = W-E S-N TVD(SBS) Top 61~04~. O0 5~5~701. O0 -~. O0 .... B.O~om .... 6_!~608.__6~628~%~_~_5 8~2.6 ~ 00 Note' Ail depths in ~eet Belo~ ~ie!!y ~ushing (~KB) " Closest Approach Vertical Intersection '__WELL...!DENT ................... /ERO~O.SED\ .................. ~NEARBY\ ...................... ~LOSES~ ............ /PROPOSED\ ....... /NEARBY\ VER~!CAL TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART DISTANCE ',:. ~P1511 822.~.-T-----~¥g~7~- .....e~61"-~ ........ ~g~--~- 288~'-~ ........... ~1o2. ~ 3 ........... z~-~- .............................. 75.6 8448.1 5572. ....... W,20 ............................... lO..O .............. _O.=p ............... 0.0 .............. 0.__0 105_~ A029-2183300 W-24 85600 86900 __~o29~2k88000 3141.8 26.2. 3i3i. 7 21. 4 14.2 3210. I 37. ~ i084.6 7.0 -~iis. 33_68._? .............. Z2...i ....... 633~.. 5 ................. 3~._ I ............... 4313. 3 517. ~, 7853. ~_ '~ 484. 3 3550. O~__Q .................. O. 0 0.._0 ............ ,210. 0 0.0 0.0 O. 0 35. 0 ' W-18 9. 7 A029-2 ! 92900 ....... W-_21 900._7 ' ___SUMMARY ......................... 0.0 0.0 0.0 176.0 o. 0 8~?.:...~ ............ ! 4_:_?_ .......... _6_Z_._~ ............................................... ___T_he__~ e! l~h_i cb__c ome_s_c lp s e s t __t o__t h_e _ p_r o p o s e d _ w e.!_I _is: ................ A02~-2183300 W-24 Closest approach distance = 14. 2 ~eet _S45DUAI24'[DRANO25]W23--CLOSAP--SHORToLIS;~ Sea?ch Radius= 200 COURSE LINE Fo? proposed well: W-23 [43-16-11-12] 4-DEC-1989 14:29 --~.Closest Approach Analgsis Date: 4-DEC-89 Time: I4:29'16 Location = W-E S-N TVD(SBS) Top 6i2049.00 5959701.00 -92.00 _Bottom Note: All depths in ~eet Below lie!lg ~ushing (BKB) Page i Closest Approach Ve?tical Inteesection .... WELL_IDEN~ ..................... /PRO~OSEDN ...................... /NEARBY\ ........... CLOSEST ...... /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART __A027:2052400 ~P1511 8~54.6 ~778. 3 8294.4 5825.4 ~18. 6 7655.4 A029-2180800 .... W~Q ..... 10,_0 0,..0 .................. 0...0 ...................... ~.~0 ................. 105.0 -;' A029-2183300 ' W-24 3151.0 27.6 3140.9 ~i.4 10. 2434.7 8543.1 6'130.5 38.0 1346.9 11.3 VERTICAL D I STANCE 905. 8 -1857. 2 A029-2185~00 : . ..... W~17 ..................... 1.0.._4 ................ 0,_.0 ............... O. 0 ...... O. 0 ........ ~10. 0 ' A029-2186900 -~ W-~-~- 9. 7 O. 0 O. 0 O. 0 35. 0 · "~ __/%02~_-2188000 -' W-18 9.7 0.0 0.0 0.0 176.0 A029-21~2900 · W-21 900.7 0.0 899.5 14.9 67.9 -- SU~_!MA~ RY .. 3290.5 53.2 6167.9 ~q 9 2887.5 9428.4 1157.3 8764.3 1124.9 3346.0 The_~ell which....comes_closest_to the proposed ~ell is: A029-2183300 W-24 Closest a;p?oach distance = 10.9 Beet ;{ICK OF~ ~o? this ?un = ~2800. 0 ~eet MUD WEIGHT CALCULATIONS WELL W-23 (43-16-11-12) Mud Wt.: 8-1/2" Hole - 9.5 ppg., 12-1/4" Hole - 9.7 ppg P Sag River: P Sadlerochit: P Top Sadlerochit: 4138 psi. 3780 psi. at 8800' TVDSS 3786 psi. OB Sag River: OB Top S adlerochit: Current GOC: 300 psi. (12-1/4" hole) 626 psi. (8-1/2" hole) 8845' TVDSS 9-5/8" Casing Pt. Top Sag River Top S adlerochit 8856' TVD BKB 8799' TVD BKB 8932' TVD BKB, Cement Calculations 13-3/8" CASING Measured Depth: 2680' Basis: 2.0 x Annular volume (0.6946 cuft/ft) Total Cement Vol: 3723 cuft All Tail Slurry Vol: 3723 cuft 3878 Sx Cold Set II @ 0.96 cuft/Sk 9-5/$"CA$!NG Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 9661' 90% Annular Volume to 13-3/8" + 50 cuft (0.3132 cuft/ft) 2018 cuft 1440 cuft 802 Sx G+8% @ 1.796 cuft/Sk 578 cuft 500 Sx Neat G @ 1.156 cuft/Sk ;5 1/2" LINER Measured Depth: 9411' Hanger- 10054' Shoe Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cult (0.2291 cuft/ft) Total Cement Vol: 285 cult 184 Sx G+35% Si Flour at 1.546 cuft/Sk RIS: 12-05-89 _ RIG 3 MUD SYSTEM /- ALASKA UNITED DRILLING INC. RIG 3 MUD SYSTEM DATE October 1987 ~A~[NTS ALASKA UNITED RIG NO. 3 MUD SOLIDS CONTROL EQUIPMENT 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1 - Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desiiter) 1- Tri-Flo Horizontal Vacuum Atmospheric Mud Degasser 1- 200 gpm Operating Capacity Centrifuge 1 9- Brandt MA5 Mud Mix Agitators 1- 125 bbl. Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1- Drilling fluid flow sensor with readout at driller's console 1- Cavium Dewatering screen assembly CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE ,,, (2 thru (8) (3) Admin ~ ' ~/~;/~7 9. (9 thru-,13)' '" ,! 10. (10 and 13) 12. 13. (4) Casg ~,'~//~/ (14 thru 22) (23 thru 28) Company ~P ~"~,~a,,-,~v~/~ Lease & Well No. YES NO Is the permit fee attached .......................................... ~ 2. Is well to be located in a defined pool ............................. 3. Is we~] located proper distance from property line .................. 4. Is'we-~,l_located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate .................... ................. Does the well have a unique name and number .................. ...... 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ REMARKS Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate/~ Are necessary diagrams and descriptions of ~~"~-am~ BOPE attached. ~ ~oes BOPE have sufficient pressure rating - Test to ~'~ psig .. ,~ Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (29 thru '31)- (6) Add: .,4',d~. ,..,~'~,//, Geology: Eng '.~Aeer ing: rcs rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ - an offshore loc., are survey results of Seabed conditions presented//~' If Additional requirements ............................................. ~ INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE 0 Well History File APPENDIX Information of detailed nature that is not -particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX~ No special 'effort has been made to chronologically organize this category of information. ,o Run 1' 25 - June - 1994 PDK-1001GR Atlas Wireline Services 9673 0022 Tape Subfile 2 is type: LIS T~E HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD W- 23 500292199300 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 14-JUL-94 4146.01 K. RICHARDS R. MAYS 21 11N 12E 556 1179 91.00 53.00 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 3.500 10162.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 13.375 2678.0 72.00 9.625 9766.0 47.00 PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 9655.0 9700.5 9711.5 9712.5 9727.5 9728.0 9729.0 9740.5 9756.5 9758.0 9759.0 9767.0 BCS GR 2 1 08-JAN-90 ATLAS WIRELINE SERVICES 9.20 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 9655.0 9702.0 9713.0 9713.5 9729.5 9730.0 9730.5 9742.0 9758.5 9760.0 9760.5 976815 '~ 97~8.0 .9769.5 9782.0 9789.5 9796.0 9799.0 9800.0 9817.5 9829.0 9841.0 9848.5 9853.5 9857.5 9860.0 9866.5 9868.5 9880.0 9886.0 9894.5 9914.0 9914.5 9920.0 9922.5 9925.5 9927.0 9928.0 9928.5 9930.0 9946.0 9957.5 9963.5 9964.0 9980.5 9998.5 10015.0 $ REMARKS: ~9.0 9770.5 9784.5 9792.0 9798.0 9801.0 9801.5 9819.0 9830.0 9842.0 9850.0 9854.0 9858.0 9861.0 9867.5 9869.0 9880.5 9886.0 9894.5 9915.5 9916.0 9920.5 9922.5 9925.0 9926.5 9927.5 9928.5 9930.0 9946.5 9957.0 9961.0 9961.5 9980.0 9998.0 10015.0 PDK-100/GR Log. LOG TIED INTO BHCS RUN 08-JAN-90. LOGGING PROGRAM ORGANIZATION: 1. WELL SHUT-IN. 2. LOGGED 3 PASSES. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR EACH PASS. THE CURVE IS NAMED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS: BOREHOLE SIZE = 8" CASING SIZE = 7" SALINITY = 0 PPM A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR ALL THREE PASSES. NOTE THAT THE POROSITY CURVES ARE SEVERELY AFFECTED BY THE SLIDING SLEEVES AND PACKERS. SHIFT PROCEDURE AS FOLLOWS: 1. FIRST'SS GAMMA RAY DEPTH MATCHE~-~O PREVIOUS OPEN HOLE GAMMA RAY. 2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS SGMA. PRODUCTION RATES (24-JUN-94): GFR = 1.04 MBOPD OIL = 0.57 MBOPD WATER CUT = 45.5 % FORM. GAS = 1.04 MMSCFD GOR = 1831 SCF/STB CHOKE = 104.0 MAXIMUM WELL DEVIATION = 32 DEGREES @ 9832'. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i START DEPTH STOP DEPTH 9662.0 10002.0 9674.0 10014.0 BASELINE DEPTH 9707.0 9709.5 9710.5 9711.5 9713.0 9714.5 9729.5 9731.0 9738.0 9785.0 9786.5 9790.0 9806.5 9808.5 9809.5 9810.0 9860.5 9867.0 9869.5 9890.0 9904.0 9906.0 9913.0 9913.5 9914.5 9925.5 9928.5 9929.5 9931.0 9932.5 9933.0 9935.5 9951.0 9961.5 9962.5 9963.5 9985.5 9992.0 10002.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... SGMA 9707.0 9709.5 9710.0 9711.0 9711.5 9715.0 9731.0 9732.5 9740.0 9787.0 9789.0 9792.5 9808.5 9810.5 9811.0 9811.5 9861.0 9867.5 9870.5 9891.0 9904.5 9906.5 9914.0 9914.5 9915.0 9925.5 9928.5 9929.0 9930.5 9932.5 9933.5 9936.0 9951.0 9961.5 9962.0 9962.5 9984.5 9991.5 100'02.0 lOOb3.o $ REI~kRKS: PASS 1. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCHiB. OUT $ CN : BP EXPLORATION WN : W - 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units I GRCH PDK 68 I GAPI 2 BIF PDK 68 1 3 BKL PDK 68 i CPS 4 BKS PDK 68 i CPS 5 CSLS PDK 68 i CU 6 LS PDK 68 i CPS 7 MSD PDK 68 I CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 i CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 I CPS 15 SGNT PDK 68 I CU 16 PHI PDK 68 i PU-S * DATA RECORD (TYPES 0) Total Data Records: 52 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 64 958 BYTES * Tape File Start Depth = 10015.000000 Tape File End Depth = 9655.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** L~S representation code~coding summary: Rep Code: 68 12258 datums Tape Subfile: 2 266 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9664.0 10002.0 9676.0 10014.0 BASELINE DEPTH GRCH 9663.5 9665.5 9666.0 9668.0 9668.5 9678.0 9695.5 9696.5 9697.5 9698.0 9699.5 9699.0 9700.5 9700.5 9702.5 9710.0 9712.0 9711.0 9712.5 9712.0 9713.5 9712.5 9713.0 9714.0 9713.5 9714.5 9714.0 9715.5 9714.5 9715.5 9719.0 9721.0 9721.5 9722.0 9723.0 9724.0 9728.0 9729.5 9730.0 9740.0 9741.5 9745.5 9746.0 9754.5 9755.5 9756.5 9758.5 9762.5 9763.0 9764.5 9766.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... SGMA 9670.5 9680.0 9696.0 9697.0 9697.5 9712.5 9714.0 9715.0 9720.0 9722.0 9723.0 9723.5 9724.0 9725.0 9729.5 9731.0 9732.0 9747.5 9748.5 9757.0 9757.5 9764.5 9765.5 9~65.5 9774.0 9780.5 9781.0 9782.5 9794.0 9796.5 9800.0 9802.0 9803.0 9806.0 9807.0 9831.0 9832.0 9848.0 9849.0 9856.0 9857.0 9865.0 9865.5 9869.0 9869.5 9870.0 9891.0 9894.5 9895.0 9908.5 9913.5 9914.5 9915.5 9916.0 9916.5 9917.0 9917.5 9924.0 9929.0 9930.0 9930.5 9933.5 9934.0 9938.0 9945.5 9946.0 9949.0 9950.0 9950.5 9951.0 9962.0 9963.0 9965.0 9969.0 9974.0 9982.0 9993.5 9994.0 10002.0 10002.5 10005.0 10005.5 $ 9785.0 9796.5 9798.0 9802.0 9849.5 9850.0 9870.0 9870.5 9895.5 9910.0 9915.0 9915.5 9918.0 9924.0 9929.0 9929.5 9930.0 9934.5 9946.5 9952.0 9973.0 9982.0 10005.0 10005.5 9768.0 9776.0 9782.5 9783.5 9804.5 9805.0 9808.0 9808.5 9832.5 9833.0 9857.0 9857.5 9865.5 9866.5 9870.0 9871.0 9892.5 9895.5 9916.5 9917.0 9917.5 9918.0 9934.0 9935.0 9939.0 9946.0 9949.5 9950.0 9950.5 9951.5 9962.5 9963.0 9965.0 9968.5 9993.0 9994.0 10002.0 10002.5 R~S: PASS 2. ALL PDK CURVES WERE SHIFTED WITH SGMA. ! ? ?MATCH2A. OUT /??MATCH2B. OUT CN : BP EXPLORATION WN : W- 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GRCH PDK 68 i GAPI 2 BIF PDK 68 1 3 BKL PDK 68 i CPS 4 BKS PDK 68 I CPS 5 CSLS PDK 68 I CU 6 LS PDK 68 i CPS 7 MSD PDK 68 I CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 i ,CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 1 CPS 15 SGNT PDK 68 1 CU 16 PHI PDK 68 1 PU-S 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 64 * DATA RECORD (TYPES 0) 958 BYTES * Total Data Records: 52 Tape File Start Depth = 10015.000000 Tape File. End Depth = 9655.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation 'code decoding summary: ~'ep c6de.- 6s Tape Subfile: 3 Minimum record length: Maximum record length= 12~ datums 182 records... 62 bytes 958 bytes Tape 'Subfile 4 is type: LIS FILE HEADER FILE NUMBER= 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i START DEPTH STOP DEPTH 9660.0 10002.0 9672.0 10014.0 BASELINE DEPTH 9655.0 9662.5 9668.5 9678.0 9696.0 9696 .'5 9697.5 9698.0 9703.0 9711.0 9712.0 9714.0 9715.0 9716.0 9718.5 9724.0 9725.0 9727.0 9727.5 9729.0 9729.5 9734.0 9738.5 9739.0 9784.5 9786.5 9790.0 9793.0 9794.0 9795.5 9801.0 9802.5 9803.5 9812.5 9819.0 9820.0 9821.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... SGMA GRCH 9655.0 9663.0 9704.0 9735.5 9792.0 9797.5 9802.0 9814.0 9820.5 9666.5 9676.0 9696.0 9696.5 9697.0 9698.0 9711.0 9711.5 9713.5 9714.0 9715.0 9719.5 9725'0 9725.5 9727.5 9728.5 9730.0 9731.0 9740.0 9741.0 9786.5 9789.0 9795.5 9796.0 9804.5 9805.0 9821.5 9822.0 98~3.5 9829.0 9830.0 9833.0 9833.5 9841.0 9843.0 9844.0 9848.0 9855.5 9861.5 9862.0 9863.0 9864.0 9866.5 9867.0 9878.5 9879.5 9893.5 9895.0 9897.5 9899.5 9900.0 9913.0 9914.0 9914.5 9915.5 9917.0 9917.5 9918.0 9918.5 9923.5 9924.5 9929.5 9930.5 9932.0 9932.5 9934.0 9949.5 9950.0 9950.5 9951.0 9952.5 9961.0 9962.0 9963.0 9963.5 9965.0 9970.0 9971.0 9972.0 9973.5 9975.0 9976.5 9980.0 9986.5 9992.0 9992.5 9993.0 9993.5 9842.0 9849.0 9856.0 9862.0 9863.0 9864.0 9864.5 9879.0 9879.5 9893.5 9914.0 9915.5 9916.0 9917.5 9924.0 9929.0 9929.5 9934.5 9950.5 9951.0 9952.5 9960.0 9961.0 9961.5 9962.0 9976.0 9979.5 9993.0 9830.0 9830.5 9833.5 9834.5 9844.0 9844.5 9867.0 9868.0 9896.0 9898.0 9900.0 9901.0 9914.0 9914.5 9917.5 9918.0 9918.5 9919.0 9923.5 .9932.0 9933.0 9950.0 9950.5 9965.0 9969.0 9970.0 9971.5 9973.0 9974.0 9985.5 9992.0 9992.5 9993.0 10003.5 10004.0 10004.5 10005.0 10005.5 10015.0 $ REMARKS: 10004.0 10004.5 10015.0 10003.0 10004.5 10005.0 1O005.5 PASS 3. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ? ?MATCH3A. OUT / ??MATCH3B. OUT $ CN : BP EXPLORATION WN : W - 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves'. Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH PDK 68 i GAPI 2 BIF PDK 68 1 3 BKL PDK 68 i CPS 4 BKS PDK 68 i CPS 5 CSLS PDK 68 I CU 6 LS PDK 68 i CPS 7 MSD PDK 68 i CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 i CU 13 SGMB PDK 68 I CU 14 SS PDK 68 i CPS 15 SGNT PDK 68 i CU 16 PHI PDK 68 I PU-S 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 64 * DATA RECORD (TYPE# 0) Total Data Records: 52 958 BYTES * Tape File Start Depth Tape File End Depth = 10015.000000 = 9655.000000 T~pe File Level Sp~ng = Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24516 datums Tape Subfile: 4 189 records... Minimum record length: 62 bytes Maximum record length: 958 bytes 0.500000 Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass I ga~a ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PASSES INCLUDED iN AVERAGE PBU TOOL CODE PASS NUMBERS PDK GRCH $ REMARKS: 1,.2, 3 1 AVERAGED PASS. PASSES 1, 2, & 3 WERE AVERAGED. $ CN : BP EXPLORATION WN : W - 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH PNAV 68 I GAPI 2 BKL PNAV 68 I CPS 3 BKS PNAV 68 I CPS 4 BIF PNAV 68 1 5 CSLS PNAV 68 1. CU 6 LS PNAV 68 I CPS 7 MSD PNAV 68 I CU 8 RATO PNAV 68 1 9 RBOR PNAV 68 1 10 RICS PNAV 68 1 11 RIN PNAV 68 1 12 SGMAPNAV 68 i CU 13 SGMB PNAV 68 I CU 14 SS PNAV 68 i CPS 15 SGNT PNAV 68 i CU 16 PHI PNAV 68 i PU-S 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 4 4 71 784 90 5 64 * DATA RECORD (TYPES 0) 958 BYTES * ~otal Data Recor~ 52 Tape File Start Depth = 10015.000000 Tape File End Depth = 9655.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24516 datums Tape Subfile: 5 74 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9661.0 PDK 9673.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10010.0 10022.0 25-JUN-94 FSYS REV. J001 VER. 1.1 1247 25-JUN-94 10150.0 10030.0 9673.0 10022.0 9OO.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 $ TOOL NUMBER 2725XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 10162.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING 'WINDOW (FT): .0 .0 ~LUELINE COUNT -~ .... SCALES SET BY FIELD ENGI FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 90000 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN : BP EXPLORATION WN : W- 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 24 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR PDK 68 I GAPI 4 2 BIF PDK 68 i 4 3 BKL PDK 68 I CPS 4 4 BKS PDK 68 i CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 G1 PDK 68 I CPS 4 9 G2 PDK 68 1 CPS 4 10 ISS PDK 68 i CPS 4 11 LS PDK 68 i CPS 4 12 MON PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 I 4 15 RBOR PDK 68 i 4 16 RICS PDK 68 1 4 17 RIN PDK 68 i 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 i CU 4 20 SPD PDK 68 i F/MN 4 21 SS PDK 68 i CPS 4 22 TEN PDK 68 I LB 4 23 SGNT PDK 68 i CU 4 24 PHI PDK 68 i PU-S 4 4 06 511 09 4 00 201 24 4 39 705 61 4 74 169 61 4 92 630 79 4 00 201 24 4 00 201 24 4 35 975 96 4 36 631 32 4 71 162 89 4 71 162 89 4 32 125 68 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 52 386 28 4 05 626 89 4 17 922 28 4 00 201 24 4 00 201 24 96 0 1 6 6 6 1 1 1 1 6 6 0 1 0 0 0 0 6 1 5 6 5 1 1 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 145 Tape File Start Depth = 10022.000000 Tape File End Depth = 9661.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60642 datums Tape Subfile: 6 218 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9662.5 PDK 9674.5 $ LOG H~A/)ER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD' LOGGER (FT): TOP LOG INTERVAL (FT) BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): STOP DEPTH 10010.0 10022.0 25-JUN-94 FSYS REV. J001 VER. 1.1 1320 25-JUN-94 10150.0 10030.0 9673.0 10022.0 900.0 YES TOOL NUMBER 2725XA .000 10162.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 ~LUELINE COUNT R~'~ ~ SCALES SET BY FIELD ENGI~.~R FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4500 NEAR COUNT RATE LOW SCALE (CPS): 0 .oooo TOOL STANDOFF (IN): .0 REMARKS: PASS 2. $ CN : BP EXPLORATION WN : W - 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 24 Curves: Name Tool code Samples Units I GR PDK 68 i GAPI 2 BIF PDK 68 1 3 BKL PDK 68 i CPS 4 BKS PDK 68 i CPS 5 CCL PDK 68 1 6 CSLS PDK 68 i CU 7 CSS PDK 68 i CPS 8 G1 PDK 68 i CPS 9 G2 PDK 68 i CPS 10 ISS PDK 68 i CPS 11 LS PDK 68 i CPS 12 MON PDK 68 i CPS 13 MSD PDK 68 i CU 14 RATO PDK 68 1 15 RBOR PDK 68 1 16 RICS PDK 68 1 17 RIN PDK 68 1 18 SGMAPDK 68 i CU 19 SGMB PDK 68 i CU 20 SPD PDK 68 i F/MN 21 SS PDK 68 i CPS 22 TEN PDK 68 i LB 23 SGNT PDK 68 i CU 24 PHI PDK 68 i PU-S API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 06 511 09 0 4 4 00 201 24 1 4 4 39 705 61 6 4 4 74 169 61 6 4 4 92 630 79 6 4 4 00 2.01 24 1 4 4 00 201 24 1 4 4 35 975 96 1 4 4 36 631 32 1 4 4 71 162 89 6 4 4 71 162 89 6 4 4 32 125 68 0 4 4 00 201 24 1 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 96 761 61 6 4 4 00 201 24 1 4 4 52 386 28 5 4 4 05 626 89 6 4 4 17 922 28 5 4 4 00 201 24 1 4 4 00 201 24 1 96 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 144 Tape File Start Depth = 10022.000000 Tape File End Depth = 9662.500000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 60492 datums Tape Subfile: 7 217 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE Nt~ER: 7 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9658.0 PDK 9670.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10008.0 10020.0 25-JUN-94 FSYS REV. J001 VER. 1.1 1359 25-JUN-94 10150.0 10030.0 9673.0 10022.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 $ TOOL NUMBER 2725XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .000 10162.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERM3tL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 ~LUELINE COUNT SCALES SET BY FIELD ENGI FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 90000 TOOL STANDOFF (IN): .0 REMARKS: PASS 3. $ CN : BP EXPLORATION WN : W- 23 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FO~tMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 24 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR PDK 68 i GAPI 2 BIF PDK 68 1 3 BKL PDK 68. I CPS 4 BKS PDK 68 I CPS 5 CCL PDK 68 1 6 CSLS PDK 68 i CU ? CSS PDK 68 i CPS 8 G1 PDK 68 I CPS 9 G2 PDK 68 I CPS 10 ISS PDK 68 i CPS 11 LS PDK 68 I CPS 12 MON PDK 68 I CPS 13 MSD PDK 68 i CU 14 RATO PDK 68 1 15 RBOR PDK 68 1 16 RICS PDK 68 1 17 RIN PDK 68 1 18 SGMA PDK 68 I CU 19 SGMB PDK 68 i CU 20 SPD PDK 68 i F/MN 21 SS PDK 68 1 CPS 22 TEN PDK 68 I LB 23 SGNT PDK 68 i CU 24 PHI PDK 68 i PU-S 4 4 06 511 09 0 4 4 00 201 24 1 4 4 39 705 61 6 4 4 74 169 61 6 4 4 92 630 79 6 4 4 00 201 24 1 4 4 00 201 24 1 4 4 35 975 96 1 4 4 36 631 32 1 4 4 71 162 89 6 4 4 71 162 89 6 4 4 32. 125 68 0 4 4 00 201 24 1 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 96 761 61 6 4 4 00 201 24 1 4 4 52 386 28 5 4 4 05 626 89 6 4 4 17 922 28 5 4 4 00 201 24 1 4 4 00 201 24 1 96 * DATA RECORD (TYPES O) 1006 BYTES * Total Data Records: 145 Tape File Start Depth = 10020.000000 Tape File End Depth = 9658.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 96868 datums Tape Subfile= 8 218 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 9 is type: LIS 94/ 7/14 01 **** REEL TRAILER **** 94/ 7/14 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 14 JLY 94 3:41p Elapsed execution time = 8.73 seconds. SYSTEM RETURN CODE = 0 -Star~ of execUtion= Fr~~ 12 JAN 90 9:-31a **** REEL HEADER **** LIS 9ot'oe/o~. ATLAS 01' · LIS CUSTOMER FORMAT TAPE' **** TAPE HEADER **** LIS ~olo~1o~ 4146. 01 'OPEN HOLE-DiFL, BHC, CN'~R & CHCN~ RAN~ IS 10226-7286 FILE #' 1 MAIN .001 **** FILE ~ER **** 1024 CN : BP EXPLORATION WN :~ FN = PRUDHOE BAY COUN : NORTH SLOPE STAT ~". ALASKA * FomiAT agCOaD (T~E# 64) ..ONE DEPTH Pm: FRAME TAPE DEPTH UNIT : F 14 CURVES : NAME CODE S.AMp. LE# UNIT i ~R ' 68 I API 2 lU~OC 6e I ~ 3 ' RILD 68. .1.: O'dMM 4 R.ILM '68 1' OBMM 5 SPD '68 i F/MM 6 SP' 68 I i~ ? CHT', ~ ~ LB 8 TTEN 68 I LB' BY~ES 4 4 .4 4 4 4 - , 13 CN '68 I PCT 14 CNC 68 i PCT '4 4 4 4 DATA RECORD SPD SP AC LSN ( T'f~# o) 966 BYTI~S * 10226.000 O. O000000E+O0 50.00000 o, 0-00oo00E+00 -80.00000 .30,0-0000 0.2000000 300,'0000 ..100.0000 10176.000 27. 23311 50. 00000 10126 ~. 000 26.99730 81. 44344_ - $.oo76.0o0 26..gg730 . 83.17537 O, 0o00o00~:+o0 -63.15932 30.00000 o,. OOOoOOOE+oo ,66. 84550 - 0.-oooo0 0. 0000000~ +00 . .6e.o9146" 181 ..1904 4.328154 · 824.5498 10O'0ooO 5.043;929 783.8833 10o. 0o0o 85..80e569~ 358. 5674 10026.000 26,99?30 66,07651 27.790~6 -6~.47983 245.59:40 18.72061 8.74.4565 408.2278 9976.000 26.99730 .71.71825 ,39.81389 36' 255.~ 174.9897 11.23836 902.213.1 357.0750 9926.000 26,9973.0 88.35988' 26 ;46051:-": -' -71,38461 91.47400 5.091785 907..'4250 258,6716 RZLD 0'.2000000 4000.0 o-~ oo~o~b~:+oo 1.779928 5306.039 O~OooooOoE+oo 5299 o. 0o0ooooz+oo. 2.113850 -5 i[86' 4!57 1! .63879 8.253866 5!71.379 8.005880 5.35'0669 5 I'80.3.20 ' 12.35498. ,, 2.256826 5120.035 2-1.61490 RILM CiLD CNC 0.20O0O0O 0.0000000E + 00 0.00000001~+00 2.924804 561. 8206 0.0000000~+00 2.093206 553.9248 O. 0000000Z+00 2.383914 473.0706 15.63879 10.43368 121,1553 12.00588 6.2'65922 · 1'186 , 8925 16.35498 ,, 2.527913' 443.1001 25.61490 9876. O00 26. 99730 86,08162 3~4 ~. 85133 -69', 31674 107.9137 .6.471484 904, i382 284.3872 2,700743 5168.551 19.33696 3.161906 370.2686 23.33696 9826.000 26.99730 79.91269 · . 9776.000 26.99?30 87.54546. : 50.21407 -45.31966 95. 744-42 25.15460 -61.28,566 lo0. ?6 6 0 8.514938 914.1899 277.5703 10.02837 917,.9297 277.8298 3.2-22365 5174.777 22.46198 6.125931 5149.- 734 20,77750 3.852695 310.3311 26.46198 6.253413 163.2405 24.77750 ' 26 ' 99730 -~9 ~ '~ 9 .... ~51'88~ 3~§8 · 84. ,tSS05 i03.4548 280,2026 20.20097 154.2414 24.20097 9676.000 32.03217 13.84561 10.2'0776 26.99?30 -62.15501 969.6616 5252-~7~7 82 ..01373 120.. 1~61 294,4390 i?. 16'811 · · r~TAL. DATA REcORDs .;' ? 1 .- STARTING TAPE DEPTH '". 10226-00 ENDING TAPE **** FiLE TRAILER **** 9.832045 97.96468 21.16811 9666.00 2 ***** FILE SEADER *'*** FILE # ~:~:~,~. °02 1024 '. .. * FORMAT RECORD F(~E# 64) o~E DEPTH P:~R .' ' · . . TAPE DEPTH UNIT = F · ~4 cuav~s ~ NAME 1 2 3' 4 5 6 7 8 9 10 11 12 13 14 CODE SAMPLE# UNIT GR 68 -. I~,OC RILD 68. RILM 68 SPD 68 SP 68' CHT 68 TTEN 68 CiLD 68 AC 68 LSN 68 SSN 68 CN 68 CNC 68 I API !. :' OHMM I ~ ~ :~/.~ '1 MY · 1 LB · 1 LB i MMHO ~ US/F I CTS 1 CTS 1 PCT i PCT BYTES 4 4 4 4 .4 4. 4, 4 '4 4' 4 4 * DATA RECORD · .· 'DEPTH SPD SP AC LSN (TYPE# 0) 10225.000 0.0'000000R+00 -80' 00000 · 50. 00000 30 · 00000 - 966 BY'IW, S * RFOC CHT SSN -.. . · 0', O000000:g+O0. ·0. 200.0000 300;~ 0000 100. 0000 RILD RILM '~.EN CILD CN CNC 0.2000000 0.2000000 4'000.000 0. O000000E+O0 0.0000000E+00 0.0000000E+00 50 ,'00000 30.'00000 ' 1'00.0000 O, O000000E+O0 ~ ~' .5542 O,O000000E+O0 '10125.000 25.99741 81.4.6806 10075.000 26.10660 83.38101 O.O000000E+O0 -49,98737 · 30.00000 O. O000000E+O0 -50.~33231 179.0-869 5.044843 929.3428 ~OO.o0oo 5;881881 931,7148: 365.4175 1.781614 0.0o oo 2.181721 5318.535 · .12, 35381 2.0802,19 561.2886 O.O000000E+O0 · , .. . 2.494788' 458.3538 16.353'81 ioo25.0Oo 25,987¢1 -64. 17192 31.64635 -43. 37926 247.6314 18.66397 9'00.9048 412.3105 8.281008 ~:5224,266 8,~037624 10.51629 120.7583 12.03762 ... 9975.000 25.99741 74.44556 9925..00.0 2,5.99741 88.41638 .9875,000 25.,.99741 .83.82005 9825.000 25'99741 .79.81270' 9775.,000 26.65230 87.32307 38.. 87816 '-11.62615 1-63.1648 ; 2:5.98842 -41.81932. 9'3:793,*70 '33.:'5938;7 -42 5'5 ~52.663... -18.77844 99.92361 54.09888 -24,69124 94.34091 7 ..472968 930.7947 352,8093.. 5.879989 875,0937 268.0564 6; 782030 931~911t 282.7695 6,439639 937.3740 2,70. 8267 11.26886 962.' 0:~91 2?3,45'70 5.1121'89 53i6- 13. 77609 2.450961 5087.043 21.97263 2.'494374 522,~.. 3'20 17'-Si~52! -3,24498! 5241.05.9 20.22324 5.5'7 8412 5275.969 22,45639 5.944435 195.6109 17.77609 2.663980 408.0032 25.97263 2.898294 400.9O21 21.88'521- 3.971431 308. i682 24.22324 6.'059133 179.2625 26.45639 9725,000 25,99741, 85.95831 3·2,93065 -29.24832 I06,9375 9675.ooo ~ o. 25.99741 82.31412 32.1712O' -36.92548 117,0513 TOT~j., DA~A REcoRDs .* STARTING TAPE DEPTH = **** FILE ~J~ILER **** 70 10225.00 1.2.030,62 1'263.383 283.5291 6.542538 5907,258 19- 52625 14.92050 927.3708 297.2244 10.33,545 5145.742 18.20412 ENDING TAPE DEPTH 6.596451 152.8459 23.52625 9.9.63125 96.75433 22.20412 9673. O0 FILE # 3 CHCN . 003 **** FILE. ~ER **** * FORMAT RECORD E# 64) ONE DF~TH PER Fi- !'~ . TAPE DEPTH UNIT : FT 5 CURVES : NAME 1 2 3 4~ 5 ' ~R LSN SSN CNC ,. CODR ~LE# UNIT 68 I 68 .... 1 CTS 68 .1 PCT 4 4 4 4. 4- * DATA RECORD DEPTH CNC . .. · 9.806 ~ 000 -0,7525117 9756.000 -0,7525t17.; ' 9706.000 -0.7525117 9656.000 .25.Si023 9606. 000 28.01100 9556.000 57.19182 9506. 000 48.73018 9456.000 47.74217 9406.000 ~9.59926 9356.000 51.22438 · 9306.000 51,62993 9256.,000 ; . 54.39r133 . (~z# . o) OR o. oooooooz+oo. 0.~O000000E+00 o. OoooodOz+oo .. o; OooOooo=,oo 133.1006 66.88435 e?.o3029 87.28546 75~792§i 73.75.613 67.204121 79.89751 1014 BYTi~$ .*' LSN .. ~0..ooooo 30.00000 30. 00000 57..59750 .. . 27.66510 3.0.69870 29. 48640 30.89110 28,41510 · , 27.681il 24.98900 ., Ss~ soo'~ oooo ,. ~187.3656 186 · 5 868 144,8211 149.8616 142.9070 145.4108 · , 13.5.0868: -o. 7s~$~igz-o4 -0.7148349E-04 25,91316 28.39151 61.253.05 51.72411 50.61145 52.70,277 · 54.53294 54.989'61 58.09930 e- 9156.0100 73 · 601.43 25, 96091 ' 14~0.5435- 55. 4223O - 59,26031 9106.000 56.*6354? 68_. 07469 30.25780 60.62653 go56.0oo 41.52414 9006.000 48.24937 8956.000 62.0'9.801 ' 72~,47Z74 70.64828 29.68781 26.32071. 26.45390 43.60912 51.18265 66.7780-9 8906.000 · , 51.32884 66.8644'0 277, 78241 , · 8856.000 51.39578 8806:000 47.53123 8?56.000 38.15512 64,459:15 60. 25.9-1330 27'91080 36.73981 141.3053 145,7646 54.72594 50,37396 39.81517 ... 8706.000. 37.4473[7 57.49l~.2 37.30850 39.01813 · 8656.000 '* 36. 31854 .'~ 8606.000 - 37. 324'19 61.t9772 .53.38696 37.64111 . . 39.17030 147.9553 156.7743 37.74690 38.87941 8556.000 38.50931 · , 8506.000 39. 10530 35',84917 8406 ~. 000 .'37,96619 s 56.ooo 37.26350 ao6-..o0o 38.54852 50.85918 55,62605 52.24664 47.4531'2 : 56.32838 ,. 54.98502 38,53481 .. 33.6745:1. -. 42.?8720 39.19220 33.'35712 3'4.81380 158.9252 156.4583 160.5198 170.1973 138.3469 142.8044 40,21400 . 40.88519 37.21835 39,60243 38.81111 40.25826 8'256. ooo 49.07893' 8206.0~)0 45,41606 . . i 6.0oo 60 ~"44400 60.00055 57'r67224 · . 68.17603 26.36450 ,: 27.84000 26.76910 140.4563 139.8405 137.4130 52.11691 47.99202 64.91551 .8056:000 51.00752 .. 8o06. O,oo 55.59673 7956.000 61..52242 7906.000 54.18437 57.43460 7806 72,3118-6 7756,000... 56,48268 7706,0.00 - 52,17'578' . 47,64650.. 7606,000. 37,97002 71.28416 26.147'20- 66,,2.8868 , 26,07271 71.15353 23.70,860 68,19612 2 .03 9o 75. 15083 25.00160 60.55669 22,42470 53 .'09.407 25, 26060. 64.98.3.96 26.7::1.111 57.43350 30.71591. 130.2290 134.2598 13'0 · 2081 137.5389 134.0902 119.6031 124.8763 136.702.6 140.758-2 55.45708 35.47830 144,. 1130 54.28871 59.45680 66,12991 57.8663-0 6'1.52652 78.28032 60,4545l 55.60440 50.50380 39.60680 7556 000. 48 35017 35.02791 _I~4.~583 43.66902 4i,57721" '"' . , 7506.000 53.62453 29.68860 137.4997 40.26384 38.55341 7456,000 37,60681 50. 39883 36. 81720 150. 5507 39. 19785 44, 16086 42.38371 169.4850 35. 29965 50.05156 36,98730 14,6. 4779 35 · 25577 50. 548.14 36. 74870 143. 9001 7406.000 34.14523 7356'000 34.10625. 7306..000 36.84973 38.34532 TOTAL DATA RECORDS : STARTING TAPE DEPTH'= FILE TRAILER **** 121 9806.00 ENDING TAPE DEPTH - 7286.00 **** TAPE TRAILER'**** LIS o/oslol 4146 01:- **** I~EL TI~[LE~ **** 9o/oe/o ATLAS 01 TOTAL RECORDS IN THIS: LOQ!CA~ ~EEL : TOTAL RECORDS' IN THIS PHYSICAL REEL: End of execution: Fri 12 JAN 90 9~32a ElapSed execution time =- 58.17 second's. SYSTEM RETURN CODE = 0 276 276 PROGRAM: LISCAN RE'VISION: 5.1 S'~'~'r;~ of execu)~i'on: Fr.~ 19 '~.JAN 90 10:24~ **** REEL HEADER: **** LIS 90/01/09 ATLAS 01 LI~S CUSTOMER FORMAT TAPE **** TAPE HEADER **** LIS 90/01/09 PART NUMBER: W5790-PE32 4146 01' DIFL-AC-CN- 4 ARM C.~LIPER- MAIN 18 REPEAT, AND CASED HOLE CN. FILE # 1 MAIN .001 **** FILE HEADER **** 1024 CN : B.P. E~PLORATION WN : PRUDHOE BAY FN : ~~ COUN : NORTH SLOPE STAT : ALASKA * COMMENT RECORD , MAIN PASS , FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 1 5 CURVES : NAME i~Ti n CODE SAMPLE# UNIT BYTES /, 3 R [.LM 4 .. RILD 5 RFOC 6 SPD 7 TTEN 8 TEMP 9 CHT 10 SP 11 AC 12 CSSN 13 CLSN 14 CN 15 CNC 68 I OMMM 4 68 I OH MM 4 68 I OHMM 4 68 I FT~ 4 68 I LBS 4 68 I DEGR 4 68 I LB 4 68 I M~. 4 68 I US/F 4 68 I CTS 4 68 I CTS 4 68 I PCT 4 68 I PCT 4 * DATA RECORD DEPTH RFOC SP CNC 10226.000 0.200OOO0 -80.00000 0.0000000 10176.000 5.043929 -66.84550 0.0000000 10126.000 18.72061 -64.47983 12.00588 10076.000 5.091785 -71.38461 25.61490 10026.000 8.514938 -45.31966 26.46198 9976.000 8.437004 -49.38139 24.20097 9926.000 6.613901 -28..80273 22.95100 9876.000 7.360090 -9.361900 22.52805 (TYPE# O) C ILD SPD AC 0.0000000 0.0000000 50.00000 553.9248 26.99730 81.44344 121.1553 26.99730 66.07651 443.1001 26.99730 88.35988 310.3311 26.99730 79.91269 154.2414 26.99730 84.45805 153.9190 26.99730 83.80278 153.2388 26.99730 76.61369 966 BYTES * GR TTEN CSSN 0.0000000 4OOO.OOO 100.0000 0.0000000 5122.285 100.0000 27.79016 5171.379 408.2278 26.46051 5120.035 258.6716 50.21407 5174.777 277.5703 46.64394 5188.398 280.2026 121.6562 5152.969 248.1411 114.6089 5399.926 262.5278 RILM TEMP CLSN 0.2000000 100.0000 30.00000 2.093206 100.0000 30.00000 10.43368 179.4587 245-5940 2.527913 179.9684 91.47400 3.852695 180.7575 95.74442 6.794033 181.4367 103.4548 7.937722 181.8640 95.34302 7.948122 181.5293 102.2803 RILD CHT CN 0.2000000 300.0000 0.0000000 1.805299 783.8833 0.0000000 8.253866 874.4565 8.005880 2.256826 907.4250 21.61490 3.222365 914.189~- 22.46198 6.483344 940.0054 20.20097 6.496924 951.4561 18.95100 6.525763 1086.518 18.52805 -~ 07. 3206 .9.683828 58.5~4404 5 01:' 9 797 5.6838~9 9776. 000 64 .'33553 1 20.3044 1 8.88379 1 5. 54351 20.35846 25. 99741 5257.215 1 77.91 88 1041 . 232 -50. 94014 85 o 79591 246. 9601 81. 60951 23. 97990 27.97990 9 726 . 000 O. 0000000 36. 77678 O. 2 000000 O. 2000000 O. 2000000 0.0000000 4000. 000 176.0922 300. 0000 -80. 00000 57. 77789 1 80. 2526 60.51 730 23. 40997 27.40997 9676.000 0.0000000 0.0000000 0.2000000 O. 2000000 O. 2000000 O. 0000000 4000.000 174.6664 300. 0000 -80. 00000 50. 00000 100. 0000 30.00000 O. 0000000 0.0000000 75 10226.00 ENDING TAPE DEPTH = TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 9666.00 FILE # 2 MAIN .001 **** FILE HEADER **** 1024 * COMMENT RECORD * 4i ARM CALIPER. MAIN PASS , FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH U~NIT : FT 11 CURVES : NAME CODE SAMPLE# UNIT BYTES I CAL 68 I IN 4 2 TEMP 68 I DEGF 4 3 DTEM 68 I DEGF 4 4 GR 68 I API 4 5 C13 68 I INCH 4 6 C24 68 I INCH 4 7 TTEN 68 I LB 4 8 DEr 68 I DEG 4 9 RB 68 I DEG 4 10 CHT 68 I LB 4 11 SPD 68 1 F/MM 4 * DATA RECORD (TYPE// O) 1014 BYTES * CHT ~ SPD 10212.000 6.242761 5.363278 7.122244 458.7080 44.23141 10162.000 8.319319 8.211037 8.427603 881 . 1372 40. 99591 10112.000 8.438345 8.407442 8.469254 880.9902 40.10521 10062.000 8.547110 8.491425 8.602795 858.1140 40.23181 10012.000 8.547560 8.483118 8.612003 873.9348 40.99591 9962 000 8 492971 . · 8.431299 8.554638 870.8616 40.10521 9912.000 8.575407 8.528095 8,622723 877.3547 40.88670 9862.000 8.682180 8.711517 8.652849 908.3687 39.99600 9812.000 9.1 69065 9.679743 8.658386 960.1843 39.99600 9762.000 9.731634 9.858952 9.604315 938.7375 39.99600 TTEN 0.0000000 3821.410 197.7455 4614.012 198.3827 4593.875 199,1012 4531.711 198.8402 4497.078 198.2720 4475.961 197.5884 4473.250 196.3423 4584.348 192.8833 4590.711 188.9529 4663.074 9712.000 -999,2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 DEV- -1.000000 348.8740 0.2133179E'01 360.5159 0. 1266479E-02 360.3235 0.7934570E-03 359.3154 -0.4165649E-02 359.4333 0.3585815E-03 358.7942 -0. 3304291E-01 358.8372 -0.3841400E-01 359,~0~6 -0.1108780 360.7285 -0. 5010223E-01 356.5605 -999.2500 -999.2500 0.0000000 14.25301 23.16182 5.519982 22.85664 5.469074 27.04767 5.952587 44.43623 5.920080 34.02943 6.475497 37.68692 6.353163 111.2478 6.459651 120.9366 6.054545 66.71150 8.075375 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 49 1021 2. O0 ENDI,NG TAPE DEPTH = 9700.00 FILE # 3 REPEAT.O02 **** FILE HEADER **** 1024 -ONE ~EPTH PE" FRAME TAPE DEPTH UNIT : FT 15 CURYE$ : NANE CODE SANPLE# UNIT 1 C I L D 68 1 NMH O 2 C~R 68 1 3 R I LM 68 I OHMM 4 RIL.D 68 I OHMM 5 RFOC 68 I OHMM 6 SPD 68 I FT 7 TTEN 68 I LBS 8 TEMP 68 I DEGR 9 CHT 68 I LB 10 SP 68 1 11 AC 68 I US/F I 2 C SSN 68 I CTS 13 CLSN 68 I CTS 14 CN 68 I PCT 15 CNC 68 I PCT BYTES 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD (TYPE# O) 966 BYTES * DEPTH CILD GR RILM RILO RFOC SPD TTEN T EMP CHT SP AC CSSN CLSN CN CNC 10226. 000 O. 0000000 O. 0000000 0 . 2000000 0 · 2000000 O. 2000000 O. 0000000 4000. 000 100. 0000 300. 0000 -80.00000 50. 00000 100. 0000 30. 00000 O. 0000000 0.0000000 101 76. 000 556.4695 O. 0000000 2.076978 I · 797044 4.951011 25. 99741 5294.023 100.0000 939. 5088 -50. 68230 81 . 49132 100. 0000 30. 00000 0.0000000 0.0000000 101 26. 000 1'24 . 8274 30. 37479 1 0 · 11 821 8.011 059 19.06923 25.99741 5230.91~0 . 181.5082 913.8230 -47 . 82655 66. 67850 394. 4998 224. 5731 9. 078117 13.07812 10076,000 5.456180 -46.11612 26.00787 10026.000 8.042147 -19.75838 23.50047 9976.000 12.17755 -26.05037 22.83688 441.1223 25.99741 88.55191 311.8130 25.99741 78.94952 154.2566 25.99741 84.54791 157.3383 9926.000 26.75319 5415.102 258.5071 55.34850 5217.125 271.3176 45.96707 5692.582 280.9993 122.7850 2.552291 183.3827 90.35860 3.877367 185.0274 102.4161 6.719887 185.7468 108.3709 7.472157 2.266945 992.3262 22.00787 3.207050 929.7524 19.50047 6. 482704 1165.828 18.83688 6.355.732 (3 ""J '3, /. CI, OC '20,72473 9876,000 6,822529 27,94989 22,17393 9826,000 387,1692 -67,24652 10,69788 9776,000 20,14348 -15,10104 28,09718 9726,000 0,2000000 -80,00000 32,07848 9676,000 0,2000000 -80,00000 0,0000000 166,9437 25.99741 76,20880 19,93866 25,99741 58,89363 66,53972 26,65230 85,59720 0,0000000 0,0000000 47,26025 0.0000000 0.0000000 50.00000 116.9781 5445,117 270,7085 186,3110 5361,359 499,7585 118,3622 5267,859 248.00?9 37,84810 4OD0,000 184,2329 0,0000000 4000,000 100,0000 7,105929 185,5103 106,7166 74,79997 184,1?92 323,3928 18.48463 181.5021 81.69191 0.2000000 179.1659 ' 54. 79080 0.2000000 177.4617 30.00OD0 5.990043 1007.981 18.17393 50.1 5382 942.8262 6.69?8?7 15,02862 890,9033 24,09718 0.2000000 300.0000 28.0?848 0.2000000 300.0000 0.0000000 TOTAL DATA RECORDS : 75 STARTING TAPE DEPTH = 10226.00 **** FILE TRAILER **** ENDING TAPE DEPTH = 9666,00 FILE # 4 **** FILE HEADER **** C,H,CN.O04 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH.PER FRAME TAPE DEPTH UNIT : FT CURVES : NAME CODE SAMPLE# UNIT BYTES I GR 68 I AP1 4 2 CSSN 68 I CTS 4 3 CLSN 68 I CTS 4 4 CN 68 I PCT 4 5 CNC 68 I PCT 4 * DATA RECORD (TYPE# O) 1014 BYTES * 9806. 000 -0.7525119 9756.00(] -0.75251'19 9706.000 28.01100 9656.000 48. 7301 8 9606.000 49.59926 9556.000 51.62993 9506.000 52.02956 9456.000 56.63547 9406.000 48.24937 9356.000 51.32884 9306.000 47.53123 9256.000 37.44737 9206.000 37.32419 9156.000 39.10530 9106.000 37.96619 9056.000 38.54852 9006.000 45.41606 8956.000 55.99634 8906.000 55.59673 8856.000 54.18437 8806.000 72.31186 0.0000000 0.0000000 133.1006 87.03029 75.79251 67.20421 73.87155 68.07469 72.47174 66.86440 65.11160 57,49112 53.38696 55.62605 47.45313 54,98502 57.67224 71.14244 66.28868 68.19612 60.55669 100.0000 100.0000 186.5868 146.9712 I 42. 9070 135.5257 131.6650 153.7269 140.5202 147.7754 141.3053 157.4350 156.7743 156,4583 170.1973 142,8044 139.8405 133.2703 134.2598 137.5389 119.6031 30.00000 30.00000 57.59750 30.69870 30.89110 27.68!11 26.80751 30.25780 26.32071 27.78241 27.91080 37.30850 39.17030 33.67451 39.19220 34.81380 27.84000 25.78790 26.07271 26,03490 22.424?0 -0.7148349E-04 -0.7148349E-04 28.39151 51.72411 52.70277 54.98961 55.43962 60.62653 51.18265 54.65057 50.37396 39.01813 38.87941 40.88519 39.60243 40.25826 47.99202 59.90683 59.45680 57.86630 78.28032 87~06.0~0 37,97002 8656,000 38,55341 8606,000 34,14523 8556,000 36,84973 8506,000 37,18567 8456,000 48,82869 8406,000 51,84430 8356,000 52.13992 8306,000 57,30687 8256.000 52,41501 8206.000 5t,56082 8156,000 58.49292 8106.000 67.12914 8056,000 60,65652 8006,000 40.,05414 7956,000 56,69452 7906,000 57.49712 7856.000 59,37636 7806,000 54,94467 7756,000 56,99207 7706,000 65,27766 55.45708 53,62453 44,16086 50.54814 53,23979 63,66350 67,03165 63,80411 65,11705 56,11345 63,45897 63,10033 64,26950 63,60139 64,78799 48,05727 60,35292 53,04654 58.65524 64,96616 62,38089 144.1130 137,4997 169,4850 143,9001 136,4874 131,2920 136,0381 125,4239 131,3638 126,7808 132,2307 134,9186 143,0542 128,0939 135,8755 142,2537 137,1347 134,2530 136,8593 I 24,6931 128,1278 35,47830 29,68860 42,38371 36.74870 30.3?950 27,48080 25,62270 27,16730 25,53320 25,26950 25,04640 25,27541 23.58990 35,26981 26,66080 28,05040 25,17030 27,82561 23,40430 22,22450 39,60680 40,26384 35,29965 38,34532 38,72371 51,83533 55,23128 55,56419 61.38286 55.87396 54,91203 62,71857 72,44411 65,15508 41,95398 60.69327 61,59714 63,71342 58,72272 61,02837 70,35907 76~6.00~ 58.32504 7556.000 42.50916 57.01920 64.88562 7506.000 58.34499 49°08629 7456.000 62. 28264 54.45544 7406.000 108.6896 56.29211 7356.ooo 104.8302 66.17813 7306.000 189.0033 79.32651 132.5124 132.7043 134. 7489 127.4327 126.6225 126.0472 115.3805 25.29201 28.55670 28.07491 24.77431 23,86031 25.17531 18.370'/'0 62.52943 44.71858 52.12535 58.17186 60.24023 71.37325 86.18005 TOTAL DATA R:ECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** **** TAPE LIS 90/01/09 4146 01 TRAILER **'** 121 9806.00 ENDING TAPE DEPTH 7286.00 TOTAL **** REEL LIS 90/01/09 ATLAS 01 RECORDS IN THIS LOGICAL TAPE : 338 TRAILER **** TOTAL RECORDS TOTAL RECORDS IN THIS LOGICAL REEL : 339 IN THIS PHYSICAL REEL: 339 19 ::JAN 90 10:27a Ela~sed e~ecution ti:me SYSTEM RETURN CODE = 0 = 3 minutes,, 37.0 seconds.