Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
221-001
Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 5/28/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240528 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BRU 241-23 50283201910000 223061 5/13/2024 AK E-LINE CIBP/Cement HV B-12 50231200310000 207123 4/26/2024 AK E-LINE PPROF HV B-16A 50231200400100 222070 4/24/2024 AK E-LINE PPROF HV B-17 50231200490000 215189 4/23/2024 AK E-LINE Perf KTU 43-6XRD2 50133203280200 205117 5/10/2024 AK E-LINE Perf LRU C-02 50283201900000 223057 5/8/2024 AK E-LINE Perf MPU C-11A 50029213210100 221001 2/17/2024 AK E-LINE SetPacker NCIU A-17 50883201880000 223031 4/13/2024 AK E-LINE Plug/Perf/GPT Please include current contact information if different from above. T38851 T38852 T38853 T38854 T38855 T38856 T38857 T38858 MPU C-11A 50029213210100 221001 2/17/2024 AK E-LINE SetPacker Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.05.29 09:23:53 -08'00' 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Reset Patch Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 10,266 feet N/A feet true vertical 7,249 feet N/A feet Effective Depth measured 10,259 feet 8,351 feet true vertical 7,249 feet 7,002 feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)3-1/2" 4.7# / L-80 / Hyd 625 8,540' 7,157' 546 MD Packers and SSSV (type, measured and true vertical depth)Baker HB TRDP-IAE SCSSV See Above 546 TVD 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Wells Manager Contact Phone: Burst N/A Collapse N/A 2,020psi 11,200psi 3,520psi 7,240psi 11,780psi 8,540' 7,157' 5,410psi Conductor 7,249'10,260' 8,931' 5,506'Surface Production Liner 13-3/8" 9-5/8" 7" 80' 5,454' MILNE POINT / KUPARUK RIVER OIL Milne Pt Unit C-11A Plugs Junk measured measured TVD 2-3/8" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 221-001 50-029-21321-01-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0047433 & ADL0047434 measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing PressureGas-Mcf MD 115' Size 115' 4,745' Length 7,829' Casing N/A Todd Sidoti todd.sidoti@hilcorp.com 907-777-8443 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 1,720 0 1,6660 0 720 181 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG PL G Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 8:10 am, Mar 21, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.03.20 16:30:46 - 08'00' Taylor Wellman (2143) DSR-3/21/24 RBDMS JSB 032824 WCB 2024-07-11 _____________________________________________________________________________________ Revised By: TDF 3/20/2024 SCHEMATIC Milne Point Unit Well: MP C-11A Last Completed: 4/24/2021 PTD: 221-001 TD =10,266’ (MD) / TD =7,249’(TVD) Initial KB Elev.: 52’ (Alaska United #3) Ground level: 17’ 7” Top of Cement @ ~8423’ 6 2-3/8” 15 9-5/8” 1 4 4 Solid to Slotted Liner @9266’ PBTD =10,259’(MD) / PBTD =7,249’(TVD) Top of Liner @ 8431’ 13-3/8” 2 3 5 7 8 Estimated Top of Cement @ 7,850’ Tubing Punch 8,098 to 8,100 ELM on 4/25/2021 Casing Punch 8,621 to 8,626 ELM on 3/1/2021 Straddle Packer 8,088 to 8,108 ELM on 4/25/2021 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,540’ 0.0383 2-3/8” Liner 4.7# / L-80 / Hyd511 1.995” 8,431’ 10,260’ 0.0039 TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,540’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 5 8,423’ST 2: Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 6 8,463’ST 1: Port= 12 Dev.= 35, VLV= 400 BPD Orifice , TVD= 7,094’, 12/9/1990 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 10,259’ Guide Shoe OPEN HOLE / CEMENT DETAIL 12-1/4” 1875 sks Permafrost E plus 220 sks 9-5/8" x 7” 30 bbls Permafrost C in Annulus 8-1/2” 265 sks Class G 3-1/4” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL A KOP @ 8,540’ Max Hole Angle = 97° @ 9,471’ TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 MPU C-11 Drilled Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 A Sidetrack Completed: 4/24/2021 Convert to Producer – 4/29/2021 2-3/8” SLOTTED LINER DETAIL Joints Top MD BTM MD Top TVD Btm TVD 32 9,266’ 10,260 7’222 7,249’ Well Name Rig API Number Well Permit Number Start Date End Date MP C-11A EL, SL & LRS 50-029-21321-01-00 221-001 2/17/2024 2/19/2024 No operations to report. WELL SHUT IN ON ARRIVAL. PT PCE 200LP - 3000HP. RIH WITH 1 7/16" Cable Head, 2" Weight Bar, 2" CCL, 2.75" Baker 10 Setting Tool, and NS Lower Packer (Max OD = 2.82, Max Lenth = 26'). PACKER SET DEPTH = 8,108' , CCL OFFSET = 8.5' , CCL STOP DEPTH = 8,099.5. RIG DOWN/MOVE OFF. WELL SHUT IN ON DEPARTURE. 2/17/2024 - Saturday WELL S/I ON ARRIVAL. SET NS GAS LIFT STRADDLE @ 8100' SLM. RAN 3-1/2 CAT w/ 2.25'' STINGER, SET @ 8100' SLM, LRS PRESSURE UP ON TUBING, FAILED TEST LOST 400 psi IN 7 mins. R/U LRS TO IA, ACHIEVED PASSING MIT-IA, PULLED DV FROM 8118' SLM REPLACED w/ BTM INT GLV, WELL S/I ON DEPARTURE. 2/20/2024 - Tuesday 2/18/2024 - Sunday IA Flush, Pumped 200 bbls Source Water down IA, PUmped 66 bbls diesel down IA for Freeze Protect 2/19/2024 - Monday 2/16/2024 - Friday No operations to report. 2/14/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 2/15/2024 - Thursday No operations to report. NS Lower Packer RIH WITH 1 7/16" Cable Head, 2" Weight Bar, 2" CCL, 2.75" Baker 10 Setting Tool, and PACKER SET DEPTH = 8,108' SET NS GAS LIFT STRADDLE @ 8100' SLM. The slickliners referred to the top half of the patch as a "gas lift straddle." The ELMDs for the patch are correct on the WBS, included here (8088 to 8108). This was confirmed by Todd Sidoti, via email, on 7-11-2024. -WCB 1 Regg, James B (OGC) From:Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent:Friday, July 28, 2023 8:52 AM To:Regg, James B (OGC) Cc:Taylor Wellman Subject:NOT OPERABLE: MPC-11A (PTD# 2210010) - IA pressure over MOASP Attachments:MPU C-11A SCHEMATIC 7-28-2023.pdf; TIO Chart.docx Mr. Regg – PAL well MPC‐11A (PTD# 2210010) had a POGLM patch pulled covering tubing punch holes on 7/25/23. On 7/27/23 the well broke IA MOASP with an IA pressure of 2025 psi. The well has been re‐classified as NOT OPERABLE. Plan Forward: 1. FB ‐ Load and kill well with water. 2. SL ‐ ConƟngent – set plug to miƟgate IA re‐pressurizaƟon. 3. EL ‐ Set & test patch to regain tubing integrity. Please respond with any quesƟons. Thanks, Ryan Thompson Milne / Islands Well Integrity Engineer 907‐564‐5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. _____________________________________________________________________________________ Revised By: TDF 7/28/2023 SCHEMATIC Milne Point Unit Well: MP C-11A Last Completed: 4/24/2021 PTD: 221-001 TD =10,266’ (MD) / TD =7,249’(TVD) Initial KB Elev.:52’(Alaska United #3) Ground level: 17’ 7” Top of Cement @ ~8423’ 6 2-3/8” 15 9-5/8” 1 4 4 The SVS is blocked open 7-9-21 Solid to Slotted Liner @9266’ PBTD =10,259’(MD) / PBTD =7,249’(TVD) Top of Liner @ 8431’ 13- 3/8 2 3 5 7 8 Estimated Top of Cement @ 7,850’ Tubing Punch 8,098 to 8,100 on 4/25/2021 1/2” CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’0.1571 9-5/8"Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7"Production 26# / L-80 / BTRC 6.276” Surface 8,540’ 0.0383 2-3/8”Liner 4.7# / L-80 / Hyd625 1.995” 8,431’ 10,260’ 0.0039 TUBING DETAIL 3-1/2"Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,540’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’3-1/2” Camco TRDP-IAE NC SCSSV,ID=2.812” 2 8,336’Baker PBR, Seal Assembly 3 8,351’Baker ‘HB’ Packer, ID = 3.80” 4 8,389’Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 5 8,423’ST 2: Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 6 8,463’ST 1:Port= 12 Dev.=35, VLV= 400 BPD Orifice ,TVD= 7,094’,12/9/1990 7 8,504’Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 10,259’Guide Shoe OPEN HOLE / CEMENT DETAIL 12-1/4”1875 sks Permafrost E plus 220 sks 9-5/8" x 7” 30 bbls Permafrost C in Annulus 8-1/2”265 sks Class G 3-1/4”Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL A KOP @ 8,540’ Max Hole Angle = 97° @ 9,471’ TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 MPU C-11 Drilled Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 A Sidetrack Completed: 4/24/2021 Convert to Producer – 4/29/2021 2-3/8” SLOTTED LINER DETAIL Joints Top MD BTM MD Top TVD Btm TVD 32 9,266’7,222’10,259’7,249’ DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:MWD / GR / RESNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScale0 0 2210010 MILNE PT UNIT C-11A LOG HEADERS35084LogLog Header ScansDF5/4/20217489 8446 Electronic Data Set, Filename: MPU_C-11A_MainUpPass.las35084EDDigital DataDF5/4/2021 Electronic File: MPU_C-11A_25-Apr-21_CaliperSurveyLog.pdf35084EDDigital DataDF5/4/2021 Electronic File: MPU_C-11A_25-Apr-21_CaliperSurveyLog.tif35084EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 READ.pdf35085EDDigital DataDF5/4/2021 Electronic File: 630B0940.jpg35085EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 3.5'' Tubing ModalID.csv35085EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 3.5'' Tubing.IDX35085EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 3.5'' Tubing.RGB35085EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 3.5'' Tubing.SRV35085EDDigital DataDF5/4/2021 Electronic File: C-11A 2021-04-25 3.5'' Tubing.UNW35085EDDigital DataDF5/4/2021 Electronic File: Sample Data.IDX35085EDDigital DataDF5/4/2021 Electronic File: Sample Data.rgb35085EDDigital DataDF5/4/2021 Electronic File: Sample Data.UNW35085EDDigital DataDF5/4/2021 Electronic File: PDS 3-D Caliper Data Viewer Help.doc35085EDDigital DataMonday, June 28, 2021AOGCCPage 1 of 7PB1PB2 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoDF5/4/2021 Electronic File: PDS 3-D Caliper Data Viewer Help.pdf35085EDDigital Data0 0 2210010 MILNE PT UNIT C-11A LOG HEADERS35085LogLog Header Scans0 0 2210010 MILNE PT UNIT C-11A LOG HEADERS35146LogLog Header ScansDF5/21/20217840 10266 Electronic Data Set, Filename: MPU C-11A GAMMA RES.las35146EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11A_Run 10_ PWD Log_22Apr2021.las35146EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11A_Run 11_ PWD Log_22Apr2021.las35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 2MD Final.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 2TVD Final.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 5MD Final.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 5TVD Final.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 10 PWD.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 11 PWD.cgm35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A GAMMA RES.ASC35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A 2MD Final.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A 2TVD Final.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A 5MD Final.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A 5TVD Final.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 10 PWD.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 11 PWD.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPC-11A_Definitive Surveys.pdf35146EDDigital DataDF5/21/2021 Electronic File: MPC-11A_Definitive Surveys.xlsx35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A Survey Listing.txt35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A Survey.txt35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 2MD Final.tif35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 2TVD Final.tif35146EDDigital DataDF5/21/2021 Electronic File: MPU_C-11A 5MD Final.tif35146EDDigital DataMonday, June 28, 2021AOGCCPage 2 of 7U C-11A GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoDF5/21/2021 Electronic File: MPU_C-11A 5TVD Final.tif35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 10 PWD.tif35146EDDigital DataDF5/21/2021 Electronic File: MPU C-11A Run 11 PWD.tif35146EDDigital DataDF5/21/20217840 11050 Electronic Data Set, Filename: MPU C-11APB1 GAMMA RES.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 01_ PWD Log_10Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 02_ PWD Log_10Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 03_ PWD Log_11Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 04_ PWD Log_12Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 05_ PWD Log_12Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 06_ PWD Log_16Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 07_ PWD Log_17Apr2021.las35147EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB1_Run 08_ PWD Log_18Apr2021.las35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2MD Final.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2TVD Final.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5MD Final.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5TVD Final.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 01 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 02 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 03 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 04 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 05 PWD.cgm35147EDDigital DataMonday, June 28, 2021AOGCCPage 3 of 7MPU C-11APB1GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoDF5/21/2021 Electronic File: MPU C-11APB1 Run 06 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 07 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 08 PWD.cgm35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 GAMMA RES.ASC35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2MD Final.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2TVD Final.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5MD Final.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5TVD Final.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 01 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 02 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 03 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 04 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 05 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 06 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 07 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 08 PWD.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPC-11APB1_Definitive Surveys.pdf35147EDDigital DataDF5/21/2021 Electronic File: MPC-11APB1_Definitive Surveys.xlsx35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Survey Listing.txt35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Surveys.txt35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2MD Final.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 2TVD Final.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5MD Final.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU_C-11APB1 5TVD Final.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 01 PWD.tif35147EDDigital DataMonday, June 28, 2021AOGCCPage 4 of 7 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoDF5/21/2021 Electronic File: MPU C-11APB1 Run 02 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 03 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 04 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 05 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 06 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 07 PWD.tif35147EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB1 Run 08 PWD.tif35147EDDigital Data0 0 2210010 MILNE PT UNIT C-11A LOG HEADERS35147LogLog Header ScansDF5/21/20217840 10225 Electronic Data Set, Filename: MPU C-11APB2 GAMMA RES.las35148EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB2_Run 09_ PWD Log_19Apr2021.las35148EDDigital DataDF5/21/2021################Electronic Data Set, Filename: MPU C-11APB2_Run 10_ PWD Log_22Apr2021.las35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2MD Final Log.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2TVD Final Log.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 5MD Final Log.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 5TVD Final Log.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 09 PWD.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 10 PWD.cgm35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 GAMMA RES.ASC35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2MD Final Log.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2TVD Final Log.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 5MD Final Log.pdf35148EDDigital DataMonday, June 28, 2021AOGCCPage 5 of 7MPU C-11APB2GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsTotalBoxesSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYCompletion Date:4/24/2021DF5/21/2021 Electronic File: MPU C-11APB2 5TVD Final Log.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 09 PWD.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 10 PWD.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPC-11APB2_Definitive Surveys.pdf35148EDDigital DataDF5/21/2021 Electronic File: MPC-11APB2_Definitive Surveys.xlsx35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Survey Listing.txt35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Surveys.txt35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2MD Final Log.tif35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 2TVD Final Log.tif35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 5MD Final Log.tif35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 5TVD Final Log.tif35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 09 PWD.tif35148EDDigital DataDF5/21/2021 Electronic File: MPU C-11APB2 Run 10 PWD.tif35148EDDigital Data0 0 2210010 MILNE PT UNIT C-11A LOG HEADERS35148LogLog Header ScansMonday, June 28, 2021AOGCCPage 6 of 7 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21321-01-00Well Name/No. MILNE PT UNIT C-11ACompletion Status1-OILCompletion Date4/24/2021Permit to Drill2210010Operator Hilcorp Alaska, LLCMD10266TVD7249Current Status1-OIL6/28/2021UICNoComments:Compliance Reviewed By:Date:Date CommentsDescriptionRelease Date:1/13/2021Monday, June 28, 2021AOGCCPage 7 of 7M.Guhl06/28/2021 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _1 Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: 17.0' BF: Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 (ft MSL) 22.Logs Obtained: 23. BOTTOM 13-3/8" H-40 115' 9-5/8" K-55 4,745' 7" L-80 7,157' 2-3/8" L-80 7,249' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, Uncemented Solid / Slotted Liner3-1/4" TUBING RECORD 8540'3-1/2" 9.2# L-80 SIZEIf Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 265 sx Class 'G', 30 Bbls PF 'C' 8,431' 17-1/2" Surface 5,506'1875 sx PF 'E', 220 sx Class 'G' ~100 cu ft Permafrost cement STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp Alaska, LLC WAG Gas 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 4/24/2021 1068' FSL, 2205' FEL, Sec. 10, T13N, R10E, UM, AK 568' FNL, 3206' FEL, Sec. 11, T13N, R10E, UM, AK 221-001 / 321-199 Milne Point Field, Kuparuk Oil Pool 52.0' 10,259' / 7,249' HOLE SIZE AMOUNT PULLED 50-029-21321-01-00 MPU C-11A 558256 6029352 2015' FNL, 4035' FEL, Sec. 11, T13N, R10E, UM, AK CEMENTING RECORD 6031575 SETTING DEPTH TVD 6033029 BOTTOM TOP 8-1/2" Surface 12-1/4"Surface CASING WT. PER FT.GRADE 4.7# 561684 562499 TOP SETTING DEPTH MD Surface Per 20 AAC 25.283 (i)(2) attach electronic information 26# 10,260' Surface 7,068' DEPTH SET (MD) 8351' / 7002 PACKER SET (MD/TVD) 48# 36# 115' Surface 8,540' Gas-Oil Ratio:Choke Size:Water-Bbl: PRODUCTION TEST N/A Date of Test: Flow Tubing Oil-Bbl: suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary N/A 2-3/8" Slotted Liner 4/22/2021 9266' - 10259' 7222' - 7249' MWD / GR / RES Sr Res EngSr Pet GeoSr Pet Eng Oil-Bbl: Water-Bbl: 4/21/2021 4/11/2021 ADL 047434 & 047433 84-123 1800' (Approx.) 8,540' / 7,157'N/A 546' / 546' 10,266' / 7,249' Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 9:49 am, May 21, 2021 G Completion Date 4/24/2021 HEW DSR-5/24/21SFD 5/21/2021 RBDMS HEW 6/7/2021 SFD MGR28JUN~ Conventional Core(s): Yes No Sidewall Cores: 30. MD TVD Top of Productive Interval 8505' 7128' 8505' 7128' 8526' 7146' 8540' 7157' 9497' 7204' 10218' 7249' Kup D (fault) 10218' 7249' 31. List of Attachments: 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Joe Lastufka Contact Email:joseph.lastufka@hilcorp.com Authorized Contact Phone: 777-8400 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: FORMATION TESTS Permafrost - Top This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Drilling / Completion Report, Post-Rig Report, Definitive Directional Surveys, Wellbore Schematic Signature w/Date: If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. Authorized Name: Monty Myers Authorized Title: Drilling Manager Kuparuk D (Fault) Permafrost - Base 29. GEOLOGIC MARKERS (List all formations and markers encountered): Formation at total depth: Kicked off from Parent Well C-11 Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME Kuparuk C (From Base) Kuparuk C Kuparuk B The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. INSTRUCTIONS Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. TPI (Top of Producing Interval). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 5.21.2021Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2021.05.21 09:42:46 -08'00' Monty M Myers _____________________________________________________________________________________ Revised By: JNL 5/6/2021 SCHEMATIC Milne Point Unit Well: MP C-11A Last Completed: 4/24/2021 PTD: 221-001 2-3/8” SLOTTED Liner Jts Top (MD) Btm (MD Top (TVD Btm (TVD) 32 9266’ 7222’ 10259’ 7249’ TD =10,266’ (MD) / TD =7,249’(TVD) Initial KB Elev.: 52’ (Alaska United #3) Ground level: 17’ 7” Top of Cement @ ~8423’ 7 2-3/8” 15 9-5/8 ” 1 5 4 3 Solid to Slotted Liner @9266’ PBTD =10,259’(MD) / PBTD =7,249’(TVD) Tubing punch @ 8,098’ – 8,100’ on 4/25/21 Top of Liner @ 8431’ 13- 2 4 6 8 9 Estimated Top of Cement @ 7,850’ CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,540’ 0.0383 2-3/8” Liner 4.7# / L-80 / Hyd625 1.995” 8,431’ 10,260’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,540’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,091’ Pack-off GLM (~17‘ long) 16/64” orifice installed 3 8,336’ Baker PBR, Seal Assembly 4 8,351’ Baker ‘HB’ Packer, ID = 3.80” 5 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail –3-1/2” x 1-1/2” MMG-2 68,423’ST 2:Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 78,463’ST 1: Port= 12 Dev.= 35, VLV= 400 BPD Orifice , TVD= 7,094’, 12/9/1990 8 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 9 10,259’ Guide Shoe OPEN HOLE / CEMENT DETAIL 12-1/4” 1875 sks Permafrost E plus 220 sks 9-5/8" x 7” 30 bbls Permafrost C in Annulus 8-1/2” 265 sks Class G 3-1/4” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL A KOP @ 8,540’ Max Hole Angle = 97° @ 9,471’ TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 MPU C-11 Drilled Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 A Sidetrack Completed: 4/24/2021 TOWS 8540' MD 8982' MD C-11 Parent PB1 TD 11,050' MD / 7,199' TVD KOP 9,750' MD / 7,273' TVD Date 4/19/2021 PB2 TD 10,225' MD / 7,238' TVD KOP 8,780' MD / 7,226' TVD Date 4/20/2021 MPU C-11A OH Sidetrack Summary PTD: 221-001 / API: 50-029-21321-70-00 PTD: 221-001 / API: 50-029-21321-71-00 Activity Date Ops Summary 4/8/2021 Release Rig from C-04A @ 18:00. Finish getting Rig ready to Move. PJSM with NES / Rig Crews. Hook up to Pit Module and pullup the pad out of the way Pull Drilling Module off the Well around to the backside of the pad. Spot over Well C-11A and set mats/heaters in place. Set Drilling Module down. Bring Pit Module around from the front side of the pad. Stop/Pull disabled Vac truck out of the way. Position Pit Module next to Drilling Module and set down. Start MIRU Checklists. Accepted the Rig @ 5:00. 4/9/2021 Continue MIRU Ops Checklist. Secure cellar, Interconnects for both Mods, Connect to Highline Power, NU BOPE, and Test Risers MIRU checklist is completed. Fluid pack surface lines and BOPE Test BOP's as per AOGCC Requirements. Test witness is waived by AOGCC Inspector Guy Cook. Test Gas Alarms. Test rams and valves to 250psi low and 4000psi high, 3500psi annular. All rams and valves pass, F/P on TV1 and 2-3/8" P/S. L/D test joint. Remove CT riser and install sombrero. M/U injector to well, PT inner reel valve, CT riser, and CT stripper, good. Test wire, good. Install floats and PT floats and UQC connection, good. Install nozzle, get on well. PJSM with crews for opening up well. Pump 10 bbls MeOH then enough KCl water to leave MeOH at the end of the CT. Open well up to the closed choke. Zero pressure on well. Circ MeOH across the top to fill the well, the well is full. Flow check well. Offload extra drilling riser from the rig floor. PJSM then M/U BHA #1. 4/10/2021 MU injector to the BHA, PT the QTS and RIH. WHP's = SSSV 5400psi, IA 0psi, OA 0psi. Tag at 8553' PU and retagged at same depth, PUH to 7865' and log tie in. Swap coil to 9.3ppg drilling mud. Correct depth -2', RIH to 8550', close EDC and displace well to mud Mud at surface, good 9.3 at the Out MM, bring fluid inside, WHP climbing, shut down pump, check interconnect for ice plug. Found ice plug, cleared ice established returns Increase rate to 1.7 bpm, RIH looking for WOB, tag at 8549' and start milling CMT. Milled to 8560' PU WT = 36k, RIH and continue to mill. Milled to 8571' PUH circulating bottoms up then log CCL from 5300' to tag at 8528'. Bottom of the blast joint is at 8524.5', set TOWS at 8540' is good POOH OOH, good no flow, remove the injector, pull the BHA and remove the motor & mill. 2.80" Go 2.79" No Go on both mill & String Mill. MU the WS BHA, verify scribe is HS to the WS Tray. RIH with WS BHA Continue RIH. Log tie-in from 8170', correct -12'. RIH carefully to set depth. Get an up weight of 34K at 8500' then RIH to place top whipstock at 8540'. Pull CT in tension, walk pressure up slowly to set packer. Shears off at 3000 psi. Set 5k down to confirm good set. Whipstock set at 8540' @ 15R. POOH with whipstock setting tools. Good no-flow at surface. L/D whipstock setting tools. Tools have functioned normally. D1 drill and AAR with crews while L/D BHA. M/U first milling BHA, 0.4 deg fixed bend with mill and string reamer. Mill is 2.81 Go, 2.80 No-Go. Reamer is 2.80 Go, 2.79 No-Go. RIH with BHA #3, first window milling BHA. Log tie-in from 8175', correct -10.5'. Dry tag whipstock at 8541'. Pick up and go to 1.6 bpm / 3850 psi free spin. Ease down and engage casing. Start milling at 8539.4' at 15R. Four stalls getting started, then steady progress. 4/11/2021 Continue milling the window at 8541.5'. 8544.1', slow progress, PU to make sure we are not in a bind. Free Spin at 4155psi 727psi. WHP = 12psi, IAP = 280psi, OAP = 216psi. Start seeing WT at 8543.45', set down 1.47k WOB and set auto-Drill at 1fph Milled 6' to 8546', PU and back ream to TOW, dry drift to TD is clean. Open EDC, good no flow, POOH for 1.25° bend motor. OOH, flow check well, good no flow, remove injector and pull the BHA. Mills in gauge at 2.8 Go 2.79 No Go, rerun for 7" milling PU the Drillers Side Pressure Deployment Lubricator (PDL) and PT. Pump Fresh Water into the In and Out Micro-Motions and Calibrate them for MPD MU the 2nd window milling BHA and RIH. Tie-in depth, correct -11'. Close EDC. Bring rate to 1.6 bpm, apply 11.8# ECD with choke. RIH slowly to tag 7" casing. Tag 7" and continue milling window. Loss of motor work and DWOB at 8949.3', likely window exit. Hold ROP to 1 ft/hr to dress window lip with string mill. Drill rathole from 8950.3' to 8960.3'. Conduct 3 reaming passes at 15R, 0R and 30R. 8960'. Dry drift is clean, nothing seen. Pick up and open EDC. Circ new mud with black product around. Dynamic flow check is good, POOH, keep 11.8# at the window. Pressure undeploy BHA #4. 4/12/2021 Continue un-deploying the window milling BHA. BHA OOH, mills gauged 2.80" Go 2.79" No Go, PU the build BHA and deploy. BHA deployed, stab on injector, test BHI tools and there is a short, unstab and check the UQC, good. Swap out LQC and Flow Sub, good test, stab on, Eq Pressure open Combi ram and RIH WHP's = SSSV = 5500psi, WHP = 940psi, IAP = 0psi, OAP = 0psi. Log tie in, correct depth -17', WT CK = 33k. Tagged at 8426' GLM #2, roll TF 45° L and passed clean On bottom drilling Build Depth = 8561'. CT WT = 10.0 k WOB = 1.33. k ROP = 40 fph. In Rate = 1.77 bpm Out Rate = 1.84 bpm. In Density = 9.40 ppg Out Density = 9.35 ppg. Free Spin = 4171psi Circ PSI = 4489 psi. WHP = 355 ECD = 11.80 EMW Build landed, POOH for lateral BHA, flow check and POOH. Keep 11.8# at the window while POOH. PJSM with crews then undeploy BHA #5. Break off 2.5 deg motor, and lay it down. Bit is 1-3. M/U 0.9 deg motor with 2.7" x 3" ION99 3D cutters. Pressure deploy BHA #6. RIH with BHA #6, lateral drilling BHA with 0.9 deg motor. Keep 11.8# at the window. Log tie-in from 8170', correct -10'. Close EDC. Pass window, slow down to log RA marker. Tag at 8684' and drill. CT WT = 10.8 k WOB = 1.24k ROP = 41 fph. In Rate = 1.71 bpm Out Rate = 1..77 bpm. In Density = 9.46 ppg Out Density = 9.38 ppg. Free Spin = 4100 psi Circ PSI = 4290 psi. WHP = 396 ECD = 11.85 EMW. At 8785' pump 5 bbls lo/hi vis sweeps. At 8850' pull 150' wiper trip. Clean pass up and down. Continue drilling lateral ROP = 60 - 80 ft/hr with 1-2k DWOB. At 9000' pump 5 bbls lo/hi vis then pull 150' wiper. 4/13/2021 Drill from 9000' to 9150'. ROP is 60 - 90 ft/hr with 1-2k DWOB. Free spin is 4130 psi at 1.62 bpm. ECD 11.8 - 11.9# with 290 psi choke. Pump 5 bbls lo/hi vis sweeps around to prep for long wiper. Long wiper from 9148' to 8685' (just below build). 47K off bottom. Clean pass up and down. Drill from 9150' to 9600'. ROP is 70 - 90 ft/hr with 1-2K DWOB. ROP goes to 120-140 ft/hr briefly in the Kup C. MW 9.49 / 9.48 ppg In/Out. Circ pressure 4380 psi at 1.66 / 1.69 bpm. At 9300' pull 150' wiper. Clean pass up and down. Frequent BHA wipers Long wiper from 9600' to 8700' MD. Clean trip. Drill Lateral. MW In: 9.5 ppg / MW out: 9.43 ppg. Rate In: 1.62 bpm / Rate out: 1.62 bpm. Free Spin : 4055 psi @ 1.62 bpm. WOB: 1.8K to 2.2K. Issues with weight transfer. Long wiper up to 8700'. Perform Jog in hole 200'. Drop rate to 0.5 bpm. Pull through build and window without any issue. Trap pressure and open EDC. Pump 10 bbl HiVis. Circulate 1.5X B/U at 2 bpm until well cleans up. Some cracks are seen on the reel spokes, perform LO/TO on the reel and prep for weld repair. Welders arrive conduct PJSM with crews then start repair on reel. Pump 0.75 bpm through CT keep 11.8# while repair is ongoing. 4/11/2021Spud Date: Well Name: Field: County/State: MP C-11A Milne Point Hilcorp Energy Company Composite Report , Alaska 50-029-21321-01-00API #: 4/14/2021 Reel Repair. Continue welding cracks and gussets on reel spokes. Pump sweep around. Rih and close EDC. Log tie in to RA with +10' correction. Rih to bottom and min rate without issue. Drill lateral from 9725' MD. Free Spin: 4107 psi, 1.65 bpm. Rate: 1.65 bpm in, 1.73 bpm out Circ pressure: 4107 psi to 4472 psi. Mud Weight: 9.51 ppg in, 9.43 ppg out Window ECD: 11.85 ppg. Perform BHA wipers / Sweeps as needed. Drill to 10181'. Pump 5 bbls hi-vis ROP slows, stacking wt. Pick up for wiper to build section. Up weight is 41k. Perform jog then back to bottom. Stack wt at 9905'. Pickup is about 8k heavy, nothing seen on DWOB. Continue picking up pump 1.7 bpm / 4390 psi until weight cleans up, pulling about 50k with nothing on DWOB. Continue picking up until weight cleans up, pulling about 7-9k over most of the way with nothing on DWOB. Pump 5 bbls lo/hi vis sweeps. Reduce rate to 1 bpm through build. Pull through window and jog, open EDC. Pull wiper up through tangent section to 3500'. Steady stream of cuttings during wiper. Turn around at 3500'. RIH 1.96 / 2.26 bpm @ 4300 psi. MW 9.55 / 9.53 ppg In/Out. Tie-in depth, correct +21'. Confirm with RA tag. Clean counter wheel. Pass build section at min rate. RIH to bottom at 0.6 bpm. Clean pass. Drill from 10183 to 10321'. Drill at 1.60 / 1.63 bpm at 4150 psi free spin. MW 9.53 / 9.54 ppg In/Out. ROP is 30 - 60 ft/hr with 1-2k DWOB. At 10240' pump 5 bbls lo/hi vis sweeps. Frequent short pickups to keep a clean ECD. Pull 150' wiper from 10321'. Clean pass up, difficult to get turned around. 4/15/2021 Continue trying to get back to bottom. Weight transfer issues. Perform mud swap Drill Lateral from 10321' -10624' MD. Free Spin: 4090 psi @ 1.70 bpm. Rate in: 1.70 bpm, Rate out: 1.76 bpm Circulating Pressure: 4090 psi to 4377 psi. Mud Weight: 9.43 ppg in, 9.37 ppg out Window ECD: 11.78 ppg. Choke pressure: 373 psi. WOB: 1.8K. Drill Lateral from 10624' MD. Free Spin: 4090 psi @ 1.70 bpm. -Rate in: 1.71 bpm, Rate out: 1.80 bpm Circulating Pressure: 4090 psi to 4277 psi. Mud Weight: 9.46 ppg in, 9.43 ppg out Window ECD: 11.84 ppg. Choke pressure: 372 psi. WOB: 1.8K. Perform long wiper from 10785' MD to window . Pulled heavy and stalled motor at 10180' MD (Fault). Rih. Bring pump back online. Pull through without issue. At 8750' Pulled -2k on DWOB and stall motor. RIH without issue and try to pull through again, circ pressuring increase when approaching 8750'. Run back in, Pump 5 bbls lo/hi vis sweeps. Circ around at max rate and pick up 10 ft/min, stall motor at 8893'. Work back through trouble spot and circ cuttings bed out. Pull through build and window at min rate. Open EDC and circ lo/hi vis around at max rate. Circ 2x B/U until well cleans up. Close EDC. Log RA, correct +13'. RIH at 0.5 bpm. Minor bobbles, no setdowns to TD. Drill from 10786' to 10950'. MW 9.3 / 9.3 ppg In / Out. ROP around 100 ft/hr with 1-2k DWOB, -4k CT weight. Add 0.5% Lube 776 to bring lubes to 3.5%. Keep 11.8 ppg with 310 psi WHP. Frequent short pickups. Some differential sticking when turning around. Pull 150' wiper from 10950'. Up wt 40k. Clean pass up and down. Drill from 10950' to 11020'. MW 9.3 / 9.3 ppg In / Out. ROP around 80 - 100 ft/hr with 1-2k DWOB, -6k CT weight. Frequent short pickups. Drill from 11020' to 11051'. MW 9.3 / 9.3 ppg In / Out. ROP around 20 - 40 ft/hr with 1-2k DWOB, -8k CT weight. Diff sticking going up and down, frequent short pickups. Difficult to turn around with poor wt transfer. Call TD at 11051'. Pump 5 bbls lo / hi vis. Pull long wiper trip. Have to work past 10180'. Pick up above it then RIH past and pull through again. Clean pass second time, minor wt bobble. Continue wiper. Some cuttings beds seen around 8750' and 8890'. Pull through window and open EDC. 4/16/2021 Wiper to Surface. Drop rate through build section to 0.5bpm. Pull through window without issues. Jog in hole and started getting small shale back. Cleaned up relatively quickly. Steady cuttings coming back from tangent. Tag up and correct depth. Rih to 100' MD. Blow choke down. Rih. Rate In: 0.47 bpm, Rate out: 0.49 bpm. MW in: 9.38 ppg, MW out: 9.39 ppg. Maintain MPD schedule to bottom. Log tie in: 8160' MD to 8223.20' MD -8' correction. Weight Check: 34k / 12k. Close EDC, Bypass HP screens Drift open hole for liner. Rate in: 0.32 bpm, Rate out: 0.38 bpm. MW in: 9.38 ppg, MW out: 9.40 ppg . Sat down and went by 8770' MD (Toolface was rolling). Clean trip. Tag corrected TD at 11050' MD Lay liner running pill in 9.3 ppg Powerpro w/ 2 ppb Alpine beads to window. Rate in: 0.46 bpm, Rate out: 0.28 bpm. MW in: 9.40 ppg, MW out: 9.41 ppg. Clean trip. Small overpull at ~8750'. Pull above window and open EDC. Circ 11.9# around. Flowcheck near bottom is good. POOH. Flag pipe at TD and liner top depth while POOH. Good flow check at surface. L/D BHA #6. Bit is 2-2 chipped cutters. Function test BOPs. Prep rig floor for running liner. Confirm pipe count and safety jt XO. PJSM with crews. Pick up first jt, M/U NS Glide Shoe. Measured OD of the glide shoe (2.60") is larger than the printed value (2.41"). M/U 2.40" bullnose instead. Continue M/U liner. D1 drill and AAR with Madson crew while M/U liner. M/U UQC and LQC. M/U injector to well. RIH, pump 0.3 bpm. Stop at first flag, correct -13.7'. Up wt is 43k. Pass window with no issues. RIH, stack wt at 10171'. Pick up and try to work through. Work down to 10184'. 4/17/2021 Continue to work liner at 10184'. Attempted multiple scenarios to progress liner. Clean PU weights. Pull liner. PU above window while circulating slug of drilling mud out of hole. Clean 11.9 ppg around. Flow check. Hold 100 psi choke to prevent swabbing. Tag up. Flow check. Lay down 2-3/8" Production liner. Clean and clear rig floor. MU equipment to cut coil Cut 1000' of CT to move wear spot. Prep CT for connector. Install CT connector and pull test 42k, good. Test wire then install BHI UQC. PT CT connector, good. Get on well and pump 1 CT volume forward then PT checks and riser break, good. Prep rig floor for liner. Verify pipe count and safety jt XO. PJSM with rig crew and Northern Solutions rep for running liner. M/U motor and mill. M/U 2-3/8" slotted liner and XN. M/U inner string. Rattle the 1" pipe as it's picked up. Space out stinger halfway into lower O-ring sub then land upper seals into XN polished bore. M/U the rest of the solid 2-3/8" STL and 511 liner. 4/18/2021 MU MWD tools and Deployment Sleeve to liner. Rih with liner. Rate in: 0.41 bpm, Rate out: 0.72 bpm. MW in: 11.84 ppg, MW out: 11.86 ppg Circulating pressure: 989 psi. Stop at white flag 7448.44' - 7432.38 = -16' correction. Set depth. Window weight check: 42k / 15k. Run through window without issue. Run liner in OH. Tag at 10189' in compression. Attempt to PU. Pulling heavy. Attempt milling . Motor stalling off and on. Become detained at 10164' MD . Swap well over 9.5 ppg mud. Discuss with drilling engineer. Decide to open choke. Slowly work rate up. Become free. Pull up hole to 9957' MD. Attempt run back in hole. Multiple attempts to get down. Work liner. Not making any hole. Get stuck again at 10164'. Continue to circulate to get free. Free liner. Lay lube pill in from 9900' to window. Circulate 11.9 ppg fluid KWF around to surface. Flow check at window is good. POOH with second liner assembly. Flow check at surface is good. PJSM then L/D BHI tools and solid liner. L/D 1" CSH inner string. L/D slotted liner, O-ring sub, motor and mill. Clean and clear rig floor. Inspect injector chains. Prep billet in pipe shed. 4/19/2021 MU BOT Aluminum Anchor Billet. Verify EDC open. Rih with Anchor Billet. Rate in: 0.37 bpm, Rate out: 0.55 bpm. MW in: 11.84 ppg, MW out: 11.83 ppg. Log tie in with -14' correction. Rih to window. Close EDC Weight check: 34k / 15k. Rih to set depth of 9761.77' (9750' Top) Pressure up to 2200#. Set. Stack 2.5K. Good set. Pooh Lay down Billet running BHA. Make up Lateral BHA. Rih with Lateral BHA. Rate in: 0.37 bpm, Rate out: 0.55 bpm. MW in: 9.85 ppg, MW out: 11.83 ppg. Log tie in with -19' correction. Close EDC. Run though window at min rate. Tag at 8774' . Pulled heavy. Finish swapping to mud. Min rate and go by without issue. Dry tag billet at 9747' PU and bring rate up. Begin KO at 9747.42'. Free Spin: 4038 psi @ 1.72 bpm. Rate in: 1.71 bpm, Rate out: 1.71 bpm. MW in: 9.65 ppg, MW out: 9.67 ppg Circulation pressure: 4050 psi. Follow BHI procedure for starting sidetrack. Off the billet with no stalls. Drill from 9762' to 9850'. ROP is 60 - 100 ft/hr with 1-2k DWOB. Mw is 9.67 / 9.68 ppg In/Out. Keep 11.8# at window with 260 psi WHP. Pick up and drift billet area. Pick up past at min rate, RIH past at 0 rate. Clean both ways. Drill from 9850' to 10000'. Frequent pickups and sweeps to keep steady ECD. ROP is 70 - 90 ft/hr with 1-2k DWOB. Pull 150' wiper trip from 10000'. Clean pass up and down. Drill from 10000' to 10150'. ROP is 40 - 100 ft/hr with 1-2k DWOB. CT surface wt is 5-8k. Pump sweeps, pickup as needed. Long wiper from 10150' to window. Some cuttings beds and overpulls seen from 8760' back to 8700'. 15 - 20 bbl/hr losses after pulling through. Pull through window and jog, then open EDC. Pump 1.5X B/U until well cleans up. Tie-in, pass window. RIH to TD. Drill from 10150'. Rate is 1.74 / 1.58 bpm 4060 psi free spin. Keep 11.7 ppg at window with 200 psi WHP. ROP is 80 - 100 ft/hr with 1k DWOB. 100 BBL Losses for the tour. 4/20/2021 Continue drilling ahead. Encounter shale at 10171' MD. Continue to drill ahead to 10225' MD. Pull wiper while town decides on plan forward. Plan forward to clean hole up for a billet. Issue at 8742', 8785'. Try to turn around stacking up the hole. Finish wiper to window. Drop rate through the build. Wiper through window. Pump bottoms up till cuttings clean up on shaker. Log +5' correction. Start packing off. at 8774' MD. Work tools through and regain circulation. Short trip to base of build. Make a couple trips. Attempt to clean up at as drilled toolface, Appears we have inadvertently sidetracked. Discuss with Geology and Drilling engineer. Drill ahead to 8855'. Log hole to verify side track. POOH to window. Discus with town options and plan forward. Decide to continue with Open hole side track & Redrill to target C sand. Wait on directional to start new data base for new directional plan. Prep for mud displacement to new mud without black product. Close ECD. RIH & Log tie in at RA Tag @ 8545'. Set depth correction. +2'. RIH through window, Pump Min rate after window & tag btm on depth. 8855'. Drill ahead while displacing to new mud. Drill from 8855' to 9000'. ROP is 60 - 90 ft/hr with 1-2k DWOB. CT surface wt is 9.3k. Pull 150 wiper Clean. Drill from 9000' to 9300'. ROP is 100-115 ft/hr with 1-2k DWOB. CT surface wt is 6.6k. Pull 150 wiper Clean. Wiper to window clean. Open EDC, Circ clean. Close EDC, RIH & tag RA. +2' Correction. RIH to TD clean. Drill from 9300' to 9500 '. ROP is 100-115 ft/hr with 1-2k DWOB. Circ pressure 4109. ECD 11.7. CT surface wt is 8.7k. Pull 150 wipers Clean. 4/21/2021 Drilling ahead from 9509' MD to 9752' MD. Free spin: 4022 psi @ 1.71 bpm. Rate in: 1.70 bpm, Rate out: 1.67 bpm. MW in: 9.51 ppg, MW out: 9.46 ppg. Perform short wipers every 150' Drilling ahead from 9752' MD to 9905' MD. Free spin: 4077 psi @ 1.75 bpm. Rate in: 1.75 bpm, Rate out: 1.69 bpm. MW in: 9.50 ppg, MW out: 9.51 ppg. Continue drilling in C-sands. ROP dropping through siderite nodes. Long wiper to window. Rate in: 1.75 bpm, Rate out: 1.69 bpm. MW in: 9.50 ppg, MW out: 9.51 ppg. Pump bottoms up. Log tie in +4'. Head back to bottom. Rih. Rate in: 0.30 bpm, Rate out: 0.32 bpm. MW in: 9.41 ppg, MW out: 9.42 ppg. Rih at tag at 8742'MD. Toolface was rolling. Pick up and lightly push through at min rate. Run by sidetrack without issue Drilling ahead from 9905' MD to 10266 TD. Drilled fault in to B silt at 10218'. Free spin: 4047 psi @ 1.70 bpm. Rate in: 1.70 bpm, Rate out: 1.69 bpm Window ECD: 11.77 ppg. MW in: 9.48 ppg, MW out: 9.41 ppg Circulation pressure: 4047 psi to 4331 psi. Perform short wipers every 150' POOH F/ 10266 to window at 8540' at 1.7 GPM, 3940 PSI. Pulled to window & side track clean. Open EDC, Circ btm up at 1.79 GPM. 3800 psi. POOH F/ 8500' T/ Swab. Tag up and set depth. RIH at 82 FPM, 1.5 GPM. RIH at 82 FPM, 1.5 GPM. Set depth, at Tie in 8160'. -15.5' Correction RIH to 10233'. Pump at min rate. .5 BPM. Set down at 10233'. Pack off and over pull. POOH and bring up pumps. Stay clear of fault. Spot LRP while pulling out of the hole. 25 bbl 1.5 PPB beads in new 9.5 ppg mud from 10233' to window at 8450'. Clean trip. Open EDC & Start pumping 11.8 Kill wt mud at window. 4/22/2021 Finish circulating 11.8 ppg around. Perform flow check. well on slight losses (~8 bph). Paint Yellow flag at 8372.20' (8300' EOP), Paint White flag: 6572.17' (6500' EOP). Pooh an minimum rate. Lay down BHA. Bit graded 1-2. Clean and clear rig floor for liner run. DSM, TP, NS rep verified liner. Run 2-3/8" Production Liner. Make up 32 joints 2-3/8" slotted liner. Make up 26 joints 2-3/8" solid liner. Make up Deployment sleeve and BHI coiltrak Rih w/ liner. Rate in: 0.43 bpm, Rate out: 0.71 bpm. MW in: 11.83 ppg, MW out 11.76 ppg. Stop at flag 8366.02' - 8352.37'= -13.65' correction. Correct depth. Rih to window. -PU weight 37k / 14K. Run liner to bottom. 10260' corrected PU to 8300' MD. Log CCL down to latch. Corrected liner top 8430' MD. Displace well to 1%KCL While pulling out of the hole to 2500". Monitoring flow out 1-1. Final Pressure at 860 psi. Displace well to 60/40 Meth with rig monitoring flow 1-1. Chase meth in coil with fresh water. Final pressure at 920 psi. POOH from 2500 psi filling with pipe displacement. Bump up. Final pressure on well 950 psi. Close both master valves & Lock out same. Bleed off surface pressure. Good. L/D BHA, L/D Liner running tools. Install side jet Nozzle, & Stab on to stack. Pump 25 bbl fresh water through stack to cuttings tank cleaning out stack at 1.5 BPM. R/U Halliburton N2 Unit. Test lines to ctmt valve and test to 500/4000 psi. Good. Pump 15000 SCFS at 1800 CFPM taking returns to cuttings tank. Monitor returns keeping flow our from choke below 3 BPM. Bleed down N@ to Kill tank. Blow down remaining surface equipment. Install night cap. PJSM, R/D inner real iron and prep for reel swap to 2 3/8. Pull Coil through Injector. 4/23/2021 Spool 2.0" Coil up. Secure coil to reel with shipping bar. RD inner reel iron and pressure bulkhead. Swap goosenecks from 2" to 2-3/8". Swap injector blocks from 2.0" to 2-3/8". Swap out 2'' Reel to 2 3/8 Reel. Install 2 3/8 Reel. Secure saddle clamps. Install inner real iron & secure. Move 2 3/8 rams to from lower double gate to lower cavity. Install 3'' rams in upper cavity of lower double gate. Install 2 /8 Rams in upper double gate lower cavity. Leave blinds in upper cavity of upper double gate. R/U cable and sheaves to pull coil to injector. Install thread on coil puller. Pull to injector & install horse head on coil. Pull coil through injector. R/U cables & Sheaves. Prep for body test on bops. Flood stack, Test to 250. Found leak on lower ram doors driller side. Open ram doors & inspect seal. Fix same. Swap to F-22 Report at 0600. 4/24/2021 Prep for body test on bops. Flood stack, Test to 250. Found leak on lower ram doors driller side. Open ram doors & inspect seal. Fix same. Swap to F-22 Report at 0600. Rig released at 10:30. Completed rig down. Well Name Rig API Number Well Permit Number Start Date End Date MP C-11A E-line 50-029-21321-01-00 221-001 4/25/2021 4/29/2021 4/25/2021 Hoist READ Caliper tool. Once data confirmed, RIH and shoot tubing punch @ 8098' - 8100'. On first tbg punch run, there was a misrun. Couldn’t communicate with gun once at depth. POOH to investigate, couldn’t find an exact cause - intermittent readings at surface. Rebuilt the whole tool string and ran back in. Successful run. 1 9/16" punch, 4 spf, 0 degree phased, 2' OAL, 8 total holes. Next run, set Northern Solutions POGLM @ 8108'. Saw good tension loss when it set, and slacking off on it showed that it took weight. 4/26/2021 Hilcorp Alaska, LLC Weekly Operations Summary 4/29/2021 SET 3-1/2" UPPER PACKER W/ POGLM AT 8,091' MD. Nitrogen Circulation Use nitrogen to circulate IA fluids. Pumped for 1 hour w/ 700 psi on choke, 9 bbl returned, fluid level 2100'. Continue another hour, 500 psi on choke, 24 additional bbl's returned, fluid level 3100'. Pumped 3 hours w/ 300 psi on choke, 180 total bbl's returned, FL 6600'. Begin pumping again, after half hour see Nitrogen returns at tank. 331 bbl's total returned. TAG LOWER PACKER W/ 2.70" LIB AT 8,079' SLM (impression of g-fishneck). RIH W/ DPU, UPPER PACKER W/ POGLM (16/64" orifice installed). Well support Wellhead crew Set TWC, pulled CDR tree off, set new production tree, reconnected flowline and gas lift line. Set Foundation / Set Well house PT tree to 4000 psi, pt flowlines to 1500 psi pulled TWC. 4/28/2021 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]52.008500.0003/03/218500.008770.5104/13/218770.5110266.0004/21/21MDTVDNorthEastGrid EastGrid NorthLatitudeLongitudeShape[ft][ft][ft][ft][US ft][US ft]N/A7149.002287.843736.43561973.796031668.4070°29'49.3849"N149°29'35.5583"WpolygonStart MDEnd MDIntervalStart TVDEnd TVDStart N/SStart E/WEnd N/SEnd E/W[ft][ft][ft][ft][ft][ft][ft][ft][ft]MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 0.00 0.00 -52.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0052.00 0.00 0.00 52.00 0.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 48.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.42 0.42 1.32 0.00200.00 0.00 0.00 200.00 148.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 1.29 1.29 1.33 0.00300.00 0.00 0.00 300.00 248.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 2.16 2.16 1.36 0.00400.00 0.00 0.00 400.00 348.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.04 3.04 1.40 0.00500.00 0.00 0.00 500.00 448.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.91 3.91 1.44 0.00600.00 0.25 332.00 600.00 548.00 0.19 -0.10 558255.66 6029351.77 70°29'26.8957"N149°31'25.5455"W0.25 180 0.25 0.00 0.06 4.78 4.78 1.50 332.00700.00 0.00 180.00 700.00 648.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.25 0 -0.25 0.00 0.11 5.65 5.65 1.56 152.00800.00 0.00 180.00 800.00 748.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.00 0 0.00 0.00 0.11 6.53 6.53 1.63 152.00900.00 0.25 244.00 900.00 848.00 0.29 -0.40 558255.36 6029351.87 70°29'26.8967"N149°31'25.5543"W0.25 180 0.25 0.00 -0.09 7.40 7.40 1.70 312.331000.00 0.00 180.00 1000.00 948.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.25 0 -0.25 0.00 -0.30 8.27 8.27 1.78 104.901100.00 0.00 180.00 1100.00 1048.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.00 0 0.00 0.00 -0.30 9.15 9.15 1.87 104.921200.00 0.25 124.00 1200.00 1148.00 0.07 -0.42 558255.34 6029351.65 70°29'26.8946"N149°31'25.5548"W0.25 -27.398 0.25 0.00 -0.25 10.02 10.02 1.96 109.351300.00 1.50 101.00 1299.98 1247.98 -0.30 1.05 558256.81 6029351.29 70°29'26.8909"N149°31'25.5116"W1.27 -39.835 1.25 -23.00 0.56 10.89 10.89 2.05 103.631400.00 3.75 76.00 1399.88 1347.88 0.24 5.51 558261.27 6029351.86 70°29'26.8962"N149°31'25.3804"W2.47 -6.438 2.25 -25.00 4.18 11.76 11.76 2.15 84.971500.00 7.00 73.00 1499.42 1447.42 2.82 14.51 558270.25 6029354.51 70°29'26.9215"N149°31'25.1155"W3.26 -11.846 3.25 -3.00 12.49 12.64 12.63 2.25 77.641600.00 10.50 69.00 1598.25 1546.25 7.86 28.85 558284.54 6029359.67 70°29'26.9712"N149°31'24.6936"W3.55 -23.708 3.50 -4.00 26.40 13.53 13.48 2.36 73.791700.00 12.50 65.00 1696.23 1644.23 15.70 47.17 558302.80 6029367.65 70°29'27.0483"N149°31'24.1546"W2.15 -28.755 2.00 -4.00 45.11 14.45 14.33 2.49 70.791800.00 15.50 59.00 1793.26 1741.26 27.16 68.43 558323.97 6029379.27 70°29'27.1610"N149°31'23.5287"W3.33 -15.229 3.00 -6.00 68.45 15.41 15.16 2.63 67.511900.00 17.75 57.00 1889.07 1837.07 42.35 92.67 558348.09 6029394.65 70°29'27.3103"N149°31'22.8154"W2.32 10.817 2.25 -2.00 96.50 16.44 15.99 2.81 64.562000.00 19.50 58.00 1983.83 1931.83 59.50 119.61 558374.89 6029412.01 70°29'27.4790"N149°31'22.0226"W1.78 -12.636 1.75 1.00 127.87 17.55 16.80 3.01 62.732100.00 23.00 56.00 2077.02 2025.02 79.27 149.98 558405.09 6029432.02 70°29'27.6735"N149°31'21.1292"W3.57 -9.787 3.50 -2.00 163.54 18.77 17.60 3.25 61.352200.00 25.50 55.00 2168.19 2116.19 102.55 183.81 558438.74 6029455.55 70°29'27.9024"N149°31'20.1335"W2.53 -9.052 2.50 -1.00 204.12 20.14 18.37 3.53 60.062300.00 28.50 54.00 2257.28 2205.28 128.92 220.75 558475.47 6029482.22 70°29'28.1617"N149°31'19.0464"W3.03 -24.593 3.00 -1.00 249.10 21.69 19.13 3.86 58.932400.00 30.75 52.00 2344.20 2292.20 158.69 260.21 558514.69 6029512.29 70°29'28.4545"N149°31'17.8854"W2.46 0 2.25 -2.00 298.23 23.44 19.87 4.23 57.822500.00 32.50 52.00 2429.35 2377.35 190.97 301.52 558555.75 6029544.89 70°29'28.7719"N149°31'16.6695"W1.75 0 1.75 0.00 350.44 25.40 20.60 4.65 56.832600.00 35.25 52.00 2512.37 2460.37 225.28 345.44 558599.39 6029579.54 70°29'29.1094"N149°31'15.3770"W2.75 15.17 2.75 0.00 405.94 27.60 21.30 5.12 56.072700.00 37.50 53.00 2592.88 2540.88 261.37 392.50 558646.16 6029615.99 70°29'29.4643"N149°31'13.9923"W2.33 -39.699 2.25 1.00 464.94 30.07 21.99 5.63 55.542800.00 38.25 52.00 2671.81 2619.81 298.75 441.20 558694.56 6029653.75 70°29'29.8318"N149°31'12.5590"W0.97 161.266 0.75 -1.00 526.02 32.78 22.67 6.18 55.132900.00 36.50 53.00 2751.28 2699.28 335.71 489.35 558742.42 6029691.08 70°29'30.1953"N149°31'11.1420"W1.85 0 -1.75 1.00 586.41 35.64 23.36 6.73 54.803000.00 37.00 53.00 2831.41 2779.41 371.72 537.13 558789.91 6029727.46 70°29'30.5494"N 149°31'9.7357"W 0.50 0 0.50 0.00 645.89 38.64 24.06 7.30 54.603100.00 37.00 53.00 2911.27 2859.27 407.94 585.20 558837.69 6029764.05 70°29'30.9056"N 149°31'8.3212"W 0.00 50.841 0.00 0.00 705.71 41.79 24.77 7.87 54.443200.00 37.50 54.00 2990.87 2938.87 443.94 633.85 558886.05 6029800.42 70°29'31.2596"N 149°31'6.8893"W 0.79 90.397 0.50 1.00 765.81 45.11 25.49 8.45 54.353300.00 37.50 55.00 3070.21 3018.21 479.29 683.41 558935.33 6029836.16 70°29'31.6072"N 149°31'5.4307"W 0.61 22.821 0.00 1.00 826.13 48.59 26.20 9.05 54.363400.00 39.00 56.00 3148.74 3096.74 514.34 734.44 558986.07 6029871.61 70°29'31.9519"N 149°31'3.9291"W 1.62 0 1.50 1.00 887.31 52.26 26.92 9.66 54.463500.00 39.75 56.00 3226.04 3174.04 549.82 787.03 559038.38 6029907.49 70°29'32.3007"N 149°31'2.3812"W 0.75 69.081 0.75 0.00 949.92 56.15 27.62 10.29 54.593600.00 40.00 57.00 3302.78 3250.78 585.20 840.49 559091.56 6029943.29 70°29'32.6487"N 149°31'0.8078"W 0.69 90.383 0.25 1.00 1013.10 60.23 28.3310.93 54.753700.0040.0058.003379.393327.39619.74894.70559145.496029978.2570°29'32.9883"N149°30'59.2124"W0.641800.001.001076.2464.4629.0411.5854.961String / DiameterWellboreBH CoilTrak (2019) (Standard) MPC-11A CoilTrak <8780.00-10266> MPC-11ATarget NameCommentOWSG Camera Based Film Gyro Multi-Shot rev1 MPC-11 CB-Film-GMS <0-8990> MPC-11BH CoilTrak (2019) (Standard) MPC-11APB1 CoilTrak MWD<8540-11051> MPC-11APB1Positional Uncertainty Model Log Name / CommentWellbore149°31'25.5425"W149°31'31.8215"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6029351.586027347.716027347.71Latitude70°29'26.8939"N70°29'7.2002"N70°29'7.2002"N[ft]213.38Grid East[US ft]558255.76558058.04558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]2002.4646.73°included52.00 ftLocal East Grid North LongitudeSection AzimuthSurface Position UncertaintyEllipse Starting MDNAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999040.45 EastSlotRig on MPC-11 (RT)Rig on MPC-11 (RT)Mean Sea Level52.00 ft52.00 ft52.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.69 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPC-11 (RT) To Facility Vertical DatumRig on MPC-11 (RT) To Mean Sea LevelRig on MPC-11 (RT) to Ground Level at Slot (MPC-11)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase04/23/21 at 13:43 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU C PadMPC-11MPC-11AMPC-11AMPC-11A04/21/2021MPC-11APB1 at 8770.51 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 3800.00 39.75 58.00 3456.13 3404.13 653.71 949.07 559199.59 6030012.64 70°29'33.3223"N149°30'57.6122"W0.25 0 -0.25 0.00 1139.12 68.83 29.75 12.22 55.193900.00 40.75 58.00 3532.45 3480.45 687.95 1003.86 559254.11 6030047.30 70°29'33.6590"N149°30'55.9995"W1.00 69.471 1.00 0.00 1202.48 73.37 30.46 12.88 55.394000.00 41.00 59.00 3608.07 3556.07 722.14 1059.66 559309.63 6030081.93 70°29'33.9951"N149°30'54.3573"W0.70 -79.993 0.25 1.00 1266.55 78.11 31.18 13.55 55.604100.00 41.25 57.00 3683.40 3631.40 756.99 1115.43 559365.12 6030117.21 70°29'34.3378"N149°30'52.7159"W1.34 0 0.25 -2.00 1331.04 83.03 31.89 14.22 55.764200.00 41.50 57.00 3758.44 3706.44 792.99 1170.86 559420.26 6030153.64 70°29'34.6918"N149°30'51.0843"W0.25 111.093 0.25 0.00 1396.08 88.11 32.60 14.90 55.844300.00 41.25 58.00 3833.48 3781.48 828.51 1226.61 559475.72 6030189.59 70°29'35.0410"N149°30'49.4436"W0.71 0 -0.25 1.00 1461.01 93.34 33.32 15.59 55.944400.00 42.00 58.00 3908.23 3856.23 863.71 1282.94 559531.77 6030225.23 70°29'35.3871"N149°30'47.7856"W0.75 0 0.75 0.00 1526.15 98.74 34.03 16.27 56.074500.00 42.00 58.00 3982.54 3930.54 899.16 1339.69 559588.23 6030261.12 70°29'35.7357"N149°30'46.1154"W0.00 70.346 0.00 0.00 1591.78 104.33 34.75 16.97 56.184600.00 42.50 60.00 4056.57 4004.57 933.79 1397.32 559645.58 6030296.19 70°29'36.0761"N149°30'44.4191"W1.43 -156.434 0.50 2.00 1657.47 110.08 35.46 17.67 56.344700.00 41.00 59.00 4131.17 4079.17 967.57 1454.69 559702.68 6030330.42 70°29'36.4082"N149°30'42.7304"W1.64 180 -1.50 -1.00 1722.40 115.93 36.18 18.36 56.514800.00 40.50 59.00 4206.93 4154.93 1001.19 1510.64 559758.37 6030364.48 70°29'36.7388"N149°30'41.0835"W0.50 -69.375 -0.50 0.00 1786.19 121.82 36.92 19.04 56.644900.00 40.75 58.00 4282.83 4230.83 1035.21 1566.16 559813.61 6030398.93 70°29'37.0732"N149°30'39.4495"W0.70 90.379 0.25 -1.00 1849.93 127.83 37.67 19.72 56.735000.00 40.75 59.00 4358.59 4306.59 1069.32 1621.81 559868.99 6030433.47 70°29'37.4085"N149°30'37.8113"W0.65 111.384 0.00 1.00 1913.83 134.00 38.41 20.40 56.825100.00 40.50 60.00 4434.49 4382.49 1102.36 1677.91 559924.82 6030466.95 70°29'37.7334"N149°30'36.1600"W0.70 -90.38 -0.25 1.00 1977.33 140.29 39.15 21.08 56.955200.00 40.50 59.00 4510.53 4458.53 1135.33 1733.87 559980.51 6030500.34 70°29'38.0575"N149°30'34.5129"W0.65 180 0.00 -1.00 2040.66 146.71 39.90 21.76 57.075300.00 40.00 59.00 4586.85 4534.85 1168.60 1789.25 560035.63 6030534.05 70°29'38.3846"N149°30'32.8827"W0.50 0 -0.50 0.00 2103.80 153.23 40.66 22.43 57.155400.00 40.00 59.00 4663.46 4611.46 1201.71 1844.35 560090.46 6030567.58 70°29'38.7101"N149°30'31.2609"W0.00 180 0.00 0.00 2166.61 159.85 41.42 23.10 57.235500.00 39.25 59.00 4740.48 4688.48 1234.56 1899.02 560144.86 6030600.85 70°29'39.0330"N149°30'29.6517"W0.75 0 -0.75 0.00 2228.93 166.57 42.18 23.77 57.315600.00 40.00 59.00 4817.50 4765.50 1267.40 1953.68 560199.26 6030634.12 70°29'39.3559"N149°30'28.0426"W0.75 -52.648 0.75 0.00 2291.24 173.41 42.95 24.43 57.385700.00 40.50 58.00 4893.82 4841.82 1301.16 2008.77 560254.08 6030668.31 70°29'39.6878"N149°30'26.4210"W0.82 0 0.50 -1.00 2354.50 180.48 43.71 25.11 57.425800.00 40.75 58.00 4969.72 4917.72 1335.67 2063.99 560309.02 6030703.24 70°29'40.0269"N149°30'24.7956"W0.25 0 0.25 0.00 2418.35 187.74 44.47 25.80 57.455900.00 41.25 58.00 5045.19 4993.19 1370.43 2119.62 560364.37 6030738.44 70°29'40.3687"N149°30'23.1578"W0.50 180 0.50 0.00 2482.69 195.19 45.22 26.49 57.476000.00 39.75 58.00 5121.23 5069.23 1404.85 2174.70 560419.17 6030773.28 70°29'40.7070"N149°30'21.5365"W1.50 180 -1.50 0.00 2546.38 202.71 45.98 27.17 57.496100.00 38.75 58.00 5198.67 5146.67 1438.38 2228.35 560472.56 6030807.23 70°29'41.0366"N149°30'19.9570"W1.00 180 -1.00 0.00 2608.43 210.17 46.76 27.83 57.516200.00 38.50 58.00 5276.80 5224.80 1471.45 2281.29 560525.23 6030840.72 70°29'41.3617"N149°30'18.3987"W0.25 -180 -0.25 0.00 2669.65 217.67 47.54 28.48 57.536300.00 37.25 58.00 5355.73 5303.73 1503.99 2333.35 560577.03 6030873.65 70°29'41.6815"N149°30'16.8660"W1.25 0 -1.25 0.00 2729.86 225.17 48.33 29.12 57.546400.00 37.50 58.00 5435.20 5383.20 1536.15 2384.83 560628.25 6030906.22 70°29'41.9977"N149°30'15.3506"W0.25 -68.127 0.25 0.00 2789.39 232.71 49.13 29.76 57.566500.00 37.75 57.00 5514.40 5462.40 1568.96 2436.32 560679.47 6030939.42 70°29'42.3202"N149°30'13.8349"W0.66 0 0.25 -1.00 2849.36 240.42 49.93 30.39 57.566600.00 38.25 57.00 5593.20 5541.20 1602.49 2487.95 560730.84 6030973.35 70°29'42.6498"N149°30'12.3148"W0.50 180 0.50 0.00 2909.94 248.32 50.72 31.04 57.546700.00 38.00 57.00 5671.87 5619.87 1636.11 2539.73 560782.35 6031007.38 70°29'42.9803"N149°30'10.7905"W0.25 113.001 -0.25 0.00 2970.69 256.37 51.51 31.68 57.526800.00 37.50 59.00 5750.94 5698.94 1668.56 2591.64 560834.00 6031040.22 70°29'43.2992"N 149°30'9.2623"W 1.32 120.173 -0.50 2.00 3030.72 264.4752.31 32.32 57.546900.00 36.50 62.00 5830.81 5778.81 1698.20 2644.00 560886.11 6031070.27 70°29'43.5905"N 149°30'7.7210"W 2.06 -67.665 -1.00 3.00 3089.16 272.5553.11 32.95 57.637000.00 36.75 61.00 5911.06 5859.06 1726.67 2696.42 560938.31 6031099.15 70°29'43.8703"N 149°30'6.1776"W 0.65 -58.947 0.25 -1.00 3146.85 280.6753.92 33.57 57.747100.00 37.50 59.00 5990.80 5938.80 1756.85 2748.68 560990.32 6031129.73 70°29'44.1669"N 149°30'4.6392"W 1.42 180 0.75 -2.00 3205.58 289.03 54.7234.2057.817200.00 36.25 59.00 6070.79 6018.79 1787.75 2800.12 561041.51 6031161.04 70°29'44.4707"N 149°30'3.1249"W 1.25 -67.546 -1.25 0.00 3264.22 297.4555.53 34.82 57.847300.00 36.50 58.00 6151.31 6099.31 1818.74 2850.68 561091.83 6031192.42 70°29'44.7753"N 149°30'1.6362"W 0.64 0 0.25 -1.00 3322.28 305.91 56.34 35.44 57.867400.00 36.75 58.00 6231.56 6179.56 1850.36 2901.27 561142.16 6031224.43 70°29'45.0860"N 149°30'0.1468"W 0.25 180 0.25 0.00 3380.78 314.53 57.1536.06 57.877500.00 36.50 58.00 6311.82 6259.82 1881.97 2951.87 561192.50 6031256.43 70°29'45.3967"N149°29'58.6573"W0.25 180 -0.25 0.00 3439.29 323.27 57.95 36.69 57.877600.00 36.00 58.00 6392.46 6340.46 1913.30 3002.01 561242.40 6031288.15 70°29'45.7047"N149°29'57.1809"W0.50 -90.405 -0.50 0.00 3497.28 332.06 58.77 37.30 57.887700.00 36.00 57.00 6473.37 6421.37 1944.88 3051.58 561291.71 6031320.12 70°29'46.0151"N149°29'55.7214"W0.59 113.508 0.00 -1.00 3555.02 340.91 59.58 37.92 57.877800.00 35.75 58.00 6554.40 6502.40 1976.37 3101.01 561340.88 6031351.99 70°29'46.3245"N149°29'54.2663"W0.64 0 -0.25 1.00 3612.59 349.85 60.40 38.53 57.867900.00 35.75 58.00 6635.55 6583.55 2007.33 3150.55 561390.18 6031383.33 70°29'46.6288"N149°29'52.8075"W0.00 -90.406 0.00 0.00 3669.89 358.88 61.22 39.14 57.868000.00 35.75 57.00 6716.71 6664.71 2038.72 3199.83 561439.20 6031415.11 70°29'46.9373"N149°29'51.3568"W0.58 90.406 0.00 -1.00 3727.28 368.02 62.03 39.75 57.858100.00 35.75 58.00 6797.87 6745.87 2070.11 3249.10 561488.22 6031446.88 70°29'47.2458"N149°29'49.9060"W0.58 0 0.00 1.00 3784.67 377.29 62.85 40.35 57.848200.00 35.75 58.00 6879.03 6827.03 2101.07 3298.65 561537.52 6031478.22 70°29'47.5501"N149°29'48.4472"W0.00 -142.742 0.00 0.00 3841.97 386.66 63.67 40.96 57.858300.00 35.00 57.00 6960.57 6908.57 2132.17 3347.47 561586.10 6031509.70 70°29'47.8557"N149°29'47.0096"W0.95 -90.41 -0.75 -1.00 3898.84 396.07 64.49 41.57 57.848400.00 35.00 56.00 7042.48 6990.48 2163.83 3395.30 561633.67 6031541.73 70°29'48.1669"N149°29'45.6014"W0.57 90.41 0.00 -1.00 3955.36 405.51 65.32 42.17 57.818500.00 35.00 57.00 7124.40 7072.40 2195.49 3443.13 561681.25 6031573.76 70°29'48.4780"N149°29'44.1931"W0.57 0 0.00 1.00 4011.89 415.05 66.14 42.76 57.78 Tie On Point to MPC-118540.00 35.20 57.00 7157.12 7105.12 2208.01 3462.42 561700.44 6031586.43 70°29'48.6011"N149°29'43.6251"W0.50 -30.35 0.50 0.00 4034.52 416.97 66.46 43.01 57.77 Top of Whipstock8560.04 40.61 52.23 7172.93 7120.93 2215.16 3472.43 561710.39 6031593.66 70°29'48.6713"N149°29'43.3304"W30.69 -28.163 27.00 -23.80 4046.71 416.97 66.46 43.01 57.77 Int Az8590.76 52.85 44.27 7193.97 7141.97 2230.12 3488.95 561726.79 6031608.75 70°29'48.8184"N149°29'42.8438"W44.03 -43.29 39.84 -25.91 4068.99 416.98 66.48 43.03 57.77 Int Az8620.67 63.25 33.84 7209.80 7157.80 2249.84 3504.79 561742.47 6031628.59 70°29'49.0123"N149°29'42.3775"W45.59 -33.964 34.77 -34.87 4094.04 416.98 66.50 43.06 57.77 Int Az8650.68 75.54 25.51 7220.36 7168.36 2274.22 3518.58 561756.07 6031653.07 70°29'49.2519"N149°29'41.9711"W48.46 -39.434 40.95 -27.76 4120.79 416.99 66.52 43.10 57.778680.29 86.87 16.35 7224.89 7172.89 2301.49 3528.97 561766.25 6031680.41 70°29'49.5200"N149°29'41.6649"W48.94 -67.805 38.26 -30.94 4147.05 416.99 66.53 43.15 57.778710.51 88.80 11.64 7226.03 7174.03 2330.78 3536.27 561773.32 6031709.76 70°29'49.8081"N149°29'41.4496"W16.83 -74.138 6.39 -15.59 4172.44 417.00 66.54 43.19 57.778740.44 89.97 7.53 7226.36 7174.36 2360.28 3541.25 561778.07 6031739.30 70°29'50.0982"N149°29'41.3025"W14.28 -25.587 3.91 -13.73 4196.29 417.01 66.57 43.19 57.778770.51 90.68 7.19 7226.18 7174.18 2390.10 3545.11 561781.68 6031769.15 70°29'50.3915"N149°29'41.1887"W2.62 85.738 2.36 -1.13 4219.54 417.01 66.60 43.20 57.77 Tie On Point8780.00 90.77 8.40 7226.06 7174.06 2399.50 3546.39 561782.90 6031778.56 70°29'50.4840"N149°29'41.1507"W12.78 99.825 0.95 12.75 4226.92 417.15 66.67 43.23 57.79 KOP/Openhole Sidetrack8809.95 89.97 13.01 7225.87 7173.87 2428.92 3551.95 561788.23 6031808.02 70°29'50.7733"N149°29'40.9866"W15.62 54.5 -2.67 15.39 4251.14 417.15 66.70 43.23 57.798840.54 90.89 14.30 7225.64 7173.64 2458.65 3559.18 561795.22 6031837.79 70°29'51.0655"N149°29'40.7736"W5.18 -32.614 3.01 4.22 4276.77 417.16 66.74 43.23 57.788870.67 91.14 14.14 7225.11 7173.11 2487.85 3566.58 561802.39 6031867.05 70°29'51.3527"N149°29'40.5553"W0.99 126.634 0.83 -0.53 4302.17 417.17 66.78 43.23 57.788903.01 89.63 16.17 7224.89 7172.89 2519.06 3575.03 561810.59 6031898.32 70°29'51.6596"N149°29'40.3060"W7.82 126.599 -4.67 6.28 4329.72 417.18 66.83 43.24 57.788930.78 88.22 18.07 7225.41 7173.41 2545.60 3583.20 561818.56 6031924.92 70°29'51.9205"N149°29'40.0651"W8.52 167.549 -5.08 6.84 4353.86 417.19 66.88 43.25 57.788960.43 85.33 18.71 7227.08 7175.08 2573.68 3592.54 561827.68 6031953.08 70°29'52.1967"N149°29'39.7898"W9.98 43.431 -9.75 2.16 4379.91 417.20 66.93 43.26 57.788990.74 89.45 22.60 7228.46 7176.46 2602.00 3603.22 561838.13 6031981.48 70°29'52.4752"N149°29'39.4751"W18.68 78.217 13.59 12.83 4407.10 417.21 66.99 43.27 57.779020.68 89.88 24.66 7228.63 7176.63 2629.43 3615.22 561849.91 6032008.99 70°29'52.7449"N149°29'39.1214"W7.03 68.116 1.44 6.88 4434.64 417.23 67.04 43.28 57.779050.75 90.92 27.25 7228.42 7176.42 2656.46 3628.38 561862.86 6032036.13 70°29'53.0107"N149°29'38.7337"W9.28 98.785 3.46 8.61 4462.75 417.25 67.10 43.29 57.779080.89 90.46 30.22 7228.06 7176.06 2682.89 3642.86 561877.14 6032062.66 70°29'53.2705"N149°29'38.3069"W9.97 55.432 -1.53 9.85 4491.41 417.26 67.16 43.31 57.769110.70 91.72 32.05 7227.49 7175.49 2708.40 3658.27 561892.34 6032088.29 70°29'53.5213"N149°29'37.8529"W7.45 89.952 4.23 6.14 4520.12 417.29 67.21 43.32 57.769140.67 91.72 35.24 7226.59 7174.59 2733.33 3674.87 561908.74 6032113.35 70°29'53.7664"N149°29'37.3640"W10.64 84.215 0.00 10.64 4549.29 417.31 67.27 43.33 57.769170.95 92.06 38.63 7225.60 7173.60 2757.52 3693.05 561926.73 6032137.68 70°29'54.0042"N149°29'36.8284"W11.25 84.068 1.12 11.20 4579.11 417.33 67.32 43.35 57.759200.96 92.40 41.94 7224.43 7172.43 2780.39 3712.44 561945.94 6032160.70 70°29'54.2291"N149°29'36.2573"W11.08 -112.52 1.13 11.03 4608.91 417.36 67.36 43.37 57.759230.82 92.06 41.12 7223.27 7171.27 2802.73 3732.22 561965.54 6032183.19 70°29'54.4486"N149°29'35.6747"W2.97 -84.889 -1.14 -2.75 4638.62 417.39 67.40 43.39 57.749260.68 92.40 37.26 7222.10 7170.10 2825.85 3751.07 561984.21 6032206.45 70°29'54.6759"N149°29'35.1194"W12.97 -88.828 1.14 -12.93 4668.19 417.43 67.45 43.41 57.749290.75 92.46 34.15 7220.83 7168.83 2850.24 3768.60 562001.55 6032230.98 70°29'54.9157"N149°29'34.6030"W10.34 -73.363 0.20 -10.34 4697.68 417.46 67.50 43.43 57.739320.71 93.07 32.10 7219.38 7167.38 2875.30 3784.95 562017.70 6032256.16 70°29'55.1621"N149°29'34.1212"W7.13 -73.896 2.04 -6.84 4726.76 417.50 67.57 43.45 57.739350.85 93.63 30.15 7217.62 7165.62 2901.06 3800.51 562033.05 6032282.04 70°29'55.4153"N149°29'33.6630"W6.72 -87 1.86 -6.47 4755.74 417.53 67.64 43.47 57.729380.37 93.81 26.57 7215.71 7163.71 2926.98 3814.50 562046.84 6032308.06 70°29'55.6702"N149°29'33.2508"W12.12 -62.609 0.61 -12.13 4783.69 417.57 67.71 43.50 57.729411.82 95.26 23.75 7213.22 7161.22 2955.35 3827.83 562059.94 6032336.54 70°29'55.9491"N149°29'32.8580"W10.06 -67.585 4.61 -8.97 4812.85 417.60 67.80 43.53 57.719440.66 96.49 20.73 7210.27 7158.27 2981.90 3838.68 562070.59 6032363.17 70°29'56.2102"N149°29'32.5379"W11.26 -88.657 4.26 -10.47 4838.95 417.64 67.90 43.55 57.719470.66 96.55 17.79 7206.86 7154.86 3010.03 3848.51 562080.20 6032391.38 70°29'56.4868"N149°29'32.2481"W9.74 -89.091 0.20 -9.80 4865.39 417.67 68.00 43.58 57.709500.72 96.59 14.62 7203.42 7151.42 3038.71 3856.85 562088.30 6032420.11 70°29'56.7688"N149°29'32.0024"W10.48 -106.021 0.13 -10.55 4891.12 417.71 68.12 43.61 57.699530.72 95.66 11.40 7200.22 7148.22 3067.77 3863.56 562094.79 6032449.22 70°29'57.0545"N149°29'31.8043"W11.11 162.181 -3.10 -10.73 4915.92 417.74 68.25 43.64 57.699561.65 92.30 12.48 7198.07 7146.07 3097.95 3869.94 562100.94 6032479.45 70°29'57.3513"N149°29'31.6159"W11.41 -155.968 -10.86 3.49 4941.26 417.78 68.39 43.67 57.689595.05 87.88 10.51 7198.02 7146.02 3130.67 3876.60 562107.33 6032512.21 70°29'57.6731"N149°29'31.4195"W14.49 119.953 -13.23 -5.90 4968.53 417.82 68.55 43.72 57.679630.91 86.13 13.56 7199.89 7147.89 3165.69 3884.06 562114.52 6032547.29 70°29'58.0175"N149°29'31.1992"W9.80 96.482 -4.88 8.51 4997.97 417.86 68.73 43.77 57.669651.1385.7916.617201.327149.323185.163889.31562119.626032566.8070°29'58.2089"N149°29'31.0444"W15.1499.698-1.6815.085015.14417.8868.8443.7957.65Page 2 of 3 9681.14 85.30 19.52 7203.65 7151.65 3213.60 3898.59 562128.67 6032595.31 70°29'58.4886"N149°29'30.7709"W9.80 127.927 -1.63 9.70 5041.39 417.93 68.98 43.83 57.649711.06 83.60 21.72 7206.54 7154.54 3241.47 3909.07 562138.94 6032623.26 70°29'58.7626"N149°29'30.4618"W9.26 114.873 -5.68 7.35 5068.13 417.97 69.13 43.87 57.649741.64 82.48 24.17 7210.25 7158.25 3269.42 3920.90 562150.55 6032651.30 70°29'59.0375"N149°29'30.1130"W8.76 167.557 -3.66 8.01 5095.90 418.02 69.27 43.91 57.639771.12 80.78 24.55 7214.54 7162.54 3295.99 3932.93 562162.37 6032677.96 70°29'59.2987"N149°29'29.7585"W5.91 19.227 -5.77 1.29 5122.87 418.07 69.41 43.95 57.629800.84 89.51 27.58 7217.05 7165.05 3322.56 3945.94 562175.16 6032704.62 70°29'59.5599"N149°29'29.3753"W31.08 123.006 29.37 10.20 5150.55 418.12 69.54 44.00 57.619825.22 88.40 29.29 7217.50 7165.50 3343.99 3957.54 562186.60 6032726.15 70°29'59.7707"N149°29'29.0332"W8.36 122.497 -4.55 7.01 5173.70 418.17 69.65 44.05 57.609850.91 86.47 32.33 7218.65 7166.65 3366.03 3970.68 562199.56 6032748.29 70°29'59.9874"N149°29'28.6460"W14.01 173.518 -7.51 11.83 5198.37 418.22 69.76 44.09 57.599880.72 82.80 32.75 7221.43 7169.43 3391.05 3986.65 562215.33 6032773.42 70°30'0.2333"N149°29'28.1757"W12.39 66.682 -12.31 1.41 5227.14 418.28 69.87 44.14 57.589910.78 85.21 38.29 7224.58 7172.58 3415.37 4004.01 562232.50 6032797.88 70°30'0.4724"N149°29'27.6641"W20.00 103.034 8.02 18.43 5256.46 418.34 69.98 44.19 57.579940.94 84.53 41.27 7227.27 7175.27 3438.45 4023.23 562251.53 6032821.11 70°30'0.6993"N149°29'27.0980"W10.10 92.136 -2.25 9.88 5286.27 418.41 70.08 44.24 57.569970.91 84.41 44.78 7230.16 7178.16 3460.26 4043.58 562271.71 6032843.07 70°30'0.9136"N149°29'26.4985"W11.66 100.387 -0.40 11.71 5316.03 418.48 70.15 44.29 57.5610000.78 83.79 48.24 7233.23 7181.23 3480.70 4065.13 562293.10 6032863.68 70°30'1.1146"N149°29'25.8637"W11.71 87.963 -2.08 11.58 5345.74 418.56 70.21 44.34 57.5510030.77 83.94 52.09 7236.44 7184.44 3499.80 4088.02 562315.84 6032882.95 70°30'1.3023"N149°29'25.1894"W12.77 142.486 0.50 12.84 5375.50 418.64 70.26 44.39 57.5410062.42 81.10 54.30 7240.56 7188.56 3518.60 4113.14 562340.81 6032901.95 70°30'1.4870"N149°29'24.4495"W11.33 17.62 -8.97 6.98 5406.68 418.72 70.29 44.45 57.5310090.95 83.29 55.00 7244.43 7192.43 3534.95 4136.20 562363.73 6032918.48 70°30'1.6477"N149°29'23.7706"W8.05 3.464 7.68 2.45 5434.67 418.80 70.31 44.50 57.5310120.94 86.59 55.20 7247.08 7195.08 3552.04 4160.69 562388.09 6032935.75 70°30'1.8156"N149°29'23.0491"W11.02 -32.546 11.00 0.67 5464.22 418.89 70.33 44.56 57.5210151.03 89.02 53.65 7248.23 7196.23 3569.53 4185.15 562412.40 6032953.44 70°30'1.9875"N149°29'22.3289"W9.58 -101.488 8.08 -5.15 5494.01 418.98 70.35 44.62 57.5110181.13 88.40 50.59 7248.91 7196.91 3588.00 4208.90 562436.00 6032972.09 70°30'2.1691"N149°29'21.6294"W10.37 -10.605 -2.06 -10.17 5523.97 419.08 70.38 44.68 57.5010210.47 90.43 50.21 7249.21 7197.21 3606.70 4231.50 562458.46 6032990.97 70°30'2.3529"N149°29'20.9636"W7.04 -103.095 6.92 -1.30 5553.25 419.17 70.42 44.73 57.5010238.17 89.69 47.03 7249.18 7197.18 3625.01 4252.28 562479.10 6033009.44 70°30'2.5328"N149°29'20.3514"W11.79 0 -2.67 -11.48 5580.93 419.26 70.47 44.79 57.4910266.0089.6947.037249.337197.333643.984272.64562499.316033028.5670°30'2.7192"N149°29'19.7516"W0.00N/A0.000.005608.76419.3570.5344.8557.48Projection to TDPage 3 of 3 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]52.008500.0003/03/218500.0011050.0004/13/21MDTVDNorthEastGrid EastGrid NorthLatitudeLongitudeShape[ft][ft][ft][ft][US ft][US ft]N/A7149.002287.843736.43561973.796031668.4070°29'49.3849"N149°29'35.5583"WpolygonStart MDEnd MDIntervalStart TVDEnd TVDStart N/SStart E/WEnd N/SEnd E/W[ft][ft][ft][ft][ft][ft][ft][ft][ft]MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 0.00 0.00 -52.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0052.00 0.00 0.00 52.00 0.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 48.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.42 0.42 1.32 0.00200.00 0.00 0.00 200.00 148.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 1.29 1.29 1.33 0.00300.00 0.00 0.00 300.00 248.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 2.16 2.16 1.36 0.00400.00 0.00 0.00 400.00 348.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.04 3.04 1.40 0.00500.00 0.00 0.00 500.00 448.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.91 3.91 1.44 0.00600.00 0.25 332.00 600.00 548.00 0.19 -0.10 558255.66 6029351.77 70°29'26.8957"N149°31'25.5455"W0.25 180 0.25 0.00 0.06 4.78 4.78 1.50 332.00700.00 0.00 180.00 700.00 648.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.25 0 -0.25 0.00 0.11 5.65 5.65 1.56 152.00800.00 0.00 180.00 800.00 748.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.00 0 0.00 0.00 0.11 6.53 6.53 1.63 152.00900.00 0.25 244.00 900.00 848.00 0.29 -0.40 558255.36 6029351.87 70°29'26.8967"N149°31'25.5543"W0.25 180 0.25 0.00 -0.09 7.40 7.40 1.70 312.331000.00 0.00 180.00 1000.00 948.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.25 0 -0.25 0.00 -0.30 8.27 8.27 1.78 104.901100.00 0.00 180.00 1100.00 1048.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.00 0 0.00 0.00 -0.30 9.15 9.15 1.87 104.921200.00 0.25 124.00 1200.00 1148.00 0.07 -0.42 558255.34 6029351.65 70°29'26.8946"N149°31'25.5548"W0.25 -27.398 0.25 0.00 -0.25 10.02 10.02 1.96 109.351300.00 1.50 101.00 1299.98 1247.98 -0.30 1.05 558256.81 6029351.29 70°29'26.8909"N149°31'25.5116"W1.27 -39.835 1.25 -23.00 0.56 10.89 10.89 2.05 103.631400.00 3.75 76.00 1399.88 1347.88 0.24 5.51 558261.27 6029351.86 70°29'26.8962"N149°31'25.3804"W2.47 -6.438 2.25 -25.00 4.18 11.76 11.76 2.15 84.971500.00 7.00 73.00 1499.42 1447.42 2.82 14.51 558270.25 6029354.51 70°29'26.9215"N149°31'25.1155"W3.26 -11.846 3.25 -3.00 12.49 12.64 12.63 2.25 77.641600.00 10.50 69.00 1598.25 1546.25 7.86 28.85 558284.54 6029359.67 70°29'26.9712"N149°31'24.6936"W3.55 -23.708 3.50 -4.00 26.40 13.53 13.48 2.36 73.791700.00 12.50 65.00 1696.23 1644.23 15.70 47.17 558302.80 6029367.65 70°29'27.0483"N149°31'24.1546"W2.15 -28.755 2.00 -4.00 45.11 14.45 14.33 2.49 70.791800.00 15.50 59.00 1793.26 1741.26 27.16 68.43 558323.97 6029379.27 70°29'27.1610"N149°31'23.5287"W3.33 -15.229 3.00 -6.00 68.45 15.41 15.16 2.63 67.511900.00 17.75 57.00 1889.07 1837.07 42.35 92.67 558348.09 6029394.65 70°29'27.3103"N149°31'22.8154"W2.32 10.817 2.25 -2.00 96.50 16.44 15.99 2.81 64.562000.00 19.50 58.00 1983.83 1931.83 59.50 119.61 558374.89 6029412.01 70°29'27.4790"N149°31'22.0226"W1.78 -12.636 1.75 1.00 127.87 17.55 16.80 3.01 62.732100.00 23.00 56.00 2077.02 2025.02 79.27 149.98 558405.09 6029432.02 70°29'27.6735"N149°31'21.1292"W3.57 -9.787 3.50 -2.00 163.54 18.77 17.60 3.25 61.352200.00 25.50 55.00 2168.19 2116.19 102.55 183.81 558438.74 6029455.55 70°29'27.9024"N149°31'20.1335"W2.53 -9.052 2.50 -1.00 204.12 20.14 18.37 3.53 60.062300.00 28.50 54.00 2257.28 2205.28 128.92 220.75 558475.47 6029482.22 70°29'28.1617"N149°31'19.0464"W3.03 -24.593 3.00 -1.00 249.10 21.69 19.13 3.86 58.932400.00 30.75 52.00 2344.20 2292.20 158.69 260.21 558514.69 6029512.29 70°29'28.4545"N149°31'17.8854"W2.46 0 2.25 -2.00 298.23 23.44 19.87 4.23 57.822500.00 32.50 52.00 2429.35 2377.35 190.97 301.52 558555.75 6029544.89 70°29'28.7719"N149°31'16.6695"W1.75 0 1.75 0.00 350.44 25.40 20.60 4.65 56.832600.00 35.25 52.00 2512.37 2460.37 225.28 345.44 558599.39 6029579.54 70°29'29.1094"N149°31'15.3770"W2.75 15.17 2.75 0.00 405.94 27.60 21.30 5.12 56.072700.00 37.50 53.00 2592.88 2540.88 261.37 392.50 558646.16 6029615.99 70°29'29.4643"N149°31'13.9923"W2.33 -39.699 2.25 1.00 464.94 30.07 21.99 5.63 55.542800.00 38.25 52.00 2671.81 2619.81 298.75 441.20 558694.56 6029653.75 70°29'29.8318"N149°31'12.5590"W0.97 161.266 0.75 -1.00 526.02 32.78 22.67 6.18 55.132900.00 36.50 53.00 2751.28 2699.28 335.71 489.35 558742.42 6029691.08 70°29'30.1953"N149°31'11.1420"W1.85 0 -1.75 1.00 586.41 35.64 23.36 6.73 54.803000.00 37.00 53.00 2831.41 2779.41 371.72 537.13 558789.91 6029727.46 70°29'30.5494"N 149°31'9.7357"W 0.50 0 0.50 0.00 645.89 38.64 24.06 7.30 54.603100.00 37.00 53.00 2911.27 2859.27 407.94 585.20 558837.69 6029764.05 70°29'30.9056"N 149°31'8.3212"W 0.00 50.841 0.00 0.00 705.71 41.79 24.77 7.87 54.443200.00 37.50 54.00 2990.87 2938.87 443.94 633.85 558886.05 6029800.42 70°29'31.2596"N 149°31'6.8893"W 0.79 90.397 0.50 1.00 765.81 45.11 25.49 8.45 54.353300.00 37.50 55.00 3070.21 3018.21 479.29 683.41 558935.33 6029836.16 70°29'31.6072"N 149°31'5.4307"W 0.61 22.821 0.00 1.00 826.13 48.59 26.20 9.05 54.363400.00 39.00 56.00 3148.74 3096.74 514.34 734.44 558986.07 6029871.61 70°29'31.9519"N 149°31'3.9291"W 1.62 0 1.50 1.00 887.31 52.26 26.92 9.66 54.463500.00 39.75 56.00 3226.04 3174.04 549.82 787.03 559038.38 6029907.49 70°29'32.3007"N 149°31'2.3812"W 0.75 69.081 0.75 0.00 949.92 56.15 27.62 10.29 54.593600.00 40.00 57.00 3302.78 3250.78 585.20 840.49 559091.56 6029943.29 70°29'32.6487"N 149°31'0.8078"W 0.69 90.383 0.25 1.00 1013.10 60.23 28.3310.93 54.753700.00 40.00 58.00 3379.39 3327.39 619.74 894.70 559145.49 6029978.25 70°29'32.9883"N149°30'59.2124"W0.64 180 0.00 1.00 1076.24 64.46 29.04 11.58 54.963800.0039.7558.003456.133404.13653.71949.07559199.596030012.6470°29'33.3223"N149°30'57.6122"W0.250-0.250.001139.1268.8329.7512.2255.19String / DiameterWellboreTarget NameComment1OWSG Camera Based Film Gyro Multi-Shot rev1 MPC-11 CB-Film-GMS <0-8990> MPC-11BH CoilTrak (2019) (Standard) MPC-11APB1 CoilTrak MWD<8540-11051> MPC-11APB1Positional Uncertainty Model Log Name / CommentWellbore149°31'25.5425"W149°31'31.8215"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6029351.586027347.716027347.71Latitude70°29'26.8939"N70°29'7.2002"N70°29'7.2002"N[ft]213.38Grid East[US ft]558255.76558058.04558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]2002.4646.73°included52.00 ftLocal East Grid North LongitudeSection AzimuthSurface Position UncertaintyEllipse Starting MDNAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999040.45 EastSlotRig on MPC-11 (RT)Rig on MPC-11 (RT)Mean Sea Level52.00 ft52.00 ft52.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.69 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPC-11 (RT) To Facility Vertical DatumRig on MPC-11 (RT) To Mean Sea LevelRig on MPC-11 (RT) to Ground Level at Slot (MPC-11)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase04/23/21 at 13:37 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU C PadMPC-11MPC-11AMPC-11APB1MPC-11APB104/20/2021MPC-11_awp at 8500.00 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 3900.00 40.75 58.00 3532.45 3480.45 687.95 1003.86 559254.11 6030047.30 70°29'33.6590"N149°30'55.9995"W1.00 69.471 1.00 0.00 1202.48 73.37 30.46 12.88 55.394000.00 41.00 59.00 3608.07 3556.07 722.14 1059.66 559309.63 6030081.93 70°29'33.9951"N149°30'54.3573"W0.70 -79.993 0.25 1.00 1266.55 78.11 31.18 13.55 55.604100.00 41.25 57.00 3683.40 3631.40 756.99 1115.43 559365.12 6030117.21 70°29'34.3378"N149°30'52.7159"W1.34 0 0.25 -2.00 1331.04 83.03 31.89 14.22 55.764200.00 41.50 57.00 3758.44 3706.44 792.99 1170.86 559420.26 6030153.64 70°29'34.6918"N149°30'51.0843"W0.25 111.093 0.25 0.00 1396.08 88.11 32.60 14.90 55.844300.00 41.25 58.00 3833.48 3781.48 828.51 1226.61 559475.72 6030189.59 70°29'35.0410"N149°30'49.4436"W0.71 0 -0.25 1.00 1461.01 93.34 33.32 15.59 55.944400.00 42.00 58.00 3908.23 3856.23 863.71 1282.94 559531.77 6030225.23 70°29'35.3871"N149°30'47.7856"W0.75 0 0.75 0.00 1526.15 98.74 34.03 16.27 56.074500.00 42.00 58.00 3982.54 3930.54 899.16 1339.69 559588.23 6030261.12 70°29'35.7357"N149°30'46.1154"W0.00 70.346 0.00 0.00 1591.78 104.33 34.75 16.97 56.184600.00 42.50 60.00 4056.57 4004.57 933.79 1397.32 559645.58 6030296.19 70°29'36.0761"N149°30'44.4191"W1.43 -156.434 0.50 2.00 1657.47 110.08 35.46 17.67 56.344700.00 41.00 59.00 4131.17 4079.17 967.57 1454.69 559702.68 6030330.42 70°29'36.4082"N149°30'42.7304"W1.64 180 -1.50 -1.00 1722.40 115.93 36.18 18.36 56.514800.00 40.50 59.00 4206.93 4154.93 1001.19 1510.64 559758.37 6030364.48 70°29'36.7388"N149°30'41.0835"W0.50 -69.375 -0.50 0.00 1786.19 121.82 36.92 19.04 56.644900.00 40.75 58.00 4282.83 4230.83 1035.21 1566.16 559813.61 6030398.93 70°29'37.0732"N149°30'39.4495"W0.70 90.379 0.25 -1.00 1849.93 127.83 37.67 19.72 56.735000.00 40.75 59.00 4358.59 4306.59 1069.32 1621.81 559868.99 6030433.47 70°29'37.4085"N149°30'37.8113"W0.65 111.384 0.00 1.00 1913.83 134.00 38.41 20.40 56.825100.00 40.50 60.00 4434.49 4382.49 1102.36 1677.91 559924.82 6030466.95 70°29'37.7334"N149°30'36.1600"W0.70 -90.38 -0.25 1.00 1977.33 140.29 39.15 21.08 56.955200.00 40.50 59.00 4510.53 4458.53 1135.33 1733.87 559980.51 6030500.34 70°29'38.0575"N149°30'34.5129"W0.65 180 0.00 -1.00 2040.66 146.71 39.90 21.76 57.075300.00 40.00 59.00 4586.85 4534.85 1168.60 1789.25 560035.63 6030534.05 70°29'38.3846"N149°30'32.8827"W0.50 0 -0.50 0.00 2103.80 153.23 40.66 22.43 57.155400.00 40.00 59.00 4663.46 4611.46 1201.71 1844.35 560090.46 6030567.58 70°29'38.7101"N149°30'31.2609"W0.00 180 0.00 0.00 2166.61 159.85 41.42 23.10 57.235500.00 39.25 59.00 4740.48 4688.48 1234.56 1899.02 560144.86 6030600.85 70°29'39.0330"N149°30'29.6517"W0.75 0 -0.75 0.00 2228.93 166.57 42.18 23.77 57.315600.00 40.00 59.00 4817.50 4765.50 1267.40 1953.68 560199.26 6030634.12 70°29'39.3559"N149°30'28.0426"W0.75 -52.648 0.75 0.00 2291.24 173.41 42.95 24.43 57.385700.00 40.50 58.00 4893.82 4841.82 1301.16 2008.77 560254.08 6030668.31 70°29'39.6878"N149°30'26.4210"W0.82 0 0.50 -1.00 2354.50 180.48 43.71 25.11 57.425800.00 40.75 58.00 4969.72 4917.72 1335.67 2063.99 560309.02 6030703.24 70°29'40.0269"N149°30'24.7956"W0.25 0 0.25 0.00 2418.35 187.74 44.47 25.80 57.455900.00 41.25 58.00 5045.19 4993.19 1370.43 2119.62 560364.37 6030738.44 70°29'40.3687"N149°30'23.1578"W0.50 180 0.50 0.00 2482.69 195.19 45.22 26.49 57.476000.00 39.75 58.00 5121.23 5069.23 1404.85 2174.70 560419.17 6030773.28 70°29'40.7070"N149°30'21.5365"W1.50 180 -1.50 0.00 2546.38 202.71 45.98 27.17 57.496100.00 38.75 58.00 5198.67 5146.67 1438.38 2228.35 560472.56 6030807.23 70°29'41.0366"N149°30'19.9570"W1.00 180 -1.00 0.00 2608.43 210.17 46.76 27.83 57.516200.00 38.50 58.00 5276.80 5224.80 1471.45 2281.29 560525.23 6030840.72 70°29'41.3617"N149°30'18.3987"W0.25 -180 -0.25 0.00 2669.65 217.67 47.54 28.48 57.536300.00 37.25 58.00 5355.73 5303.73 1503.99 2333.35 560577.03 6030873.65 70°29'41.6815"N149°30'16.8660"W1.25 0 -1.25 0.00 2729.86 225.17 48.33 29.12 57.546400.00 37.50 58.00 5435.20 5383.20 1536.15 2384.83 560628.25 6030906.22 70°29'41.9977"N149°30'15.3506"W0.25 -68.127 0.25 0.00 2789.39 232.71 49.13 29.76 57.566500.00 37.75 57.00 5514.40 5462.40 1568.96 2436.32 560679.47 6030939.42 70°29'42.3202"N149°30'13.8349"W0.66 0 0.25 -1.00 2849.36 240.42 49.93 30.39 57.566600.00 38.25 57.00 5593.20 5541.20 1602.49 2487.95 560730.84 6030973.35 70°29'42.6498"N149°30'12.3148"W0.50 180 0.50 0.00 2909.94 248.32 50.72 31.04 57.546700.00 38.00 57.00 5671.87 5619.87 1636.11 2539.73 560782.35 6031007.38 70°29'42.9803"N149°30'10.7905"W0.25 113.001 -0.25 0.00 2970.69 256.37 51.51 31.68 57.526800.00 37.50 59.00 5750.94 5698.94 1668.56 2591.64 560834.00 6031040.22 70°29'43.2992"N 149°30'9.2623"W 1.32 120.173 -0.50 2.00 3030.72 264.4752.31 32.32 57.546900.00 36.50 62.00 5830.81 5778.81 1698.20 2644.00 560886.11 6031070.27 70°29'43.5905"N 149°30'7.7210"W 2.06 -67.665 -1.00 3.00 3089.16 272.5553.11 32.95 57.637000.00 36.75 61.00 5911.06 5859.06 1726.67 2696.42 560938.31 6031099.15 70°29'43.8703"N 149°30'6.1776"W 0.65 -58.947 0.25 -1.00 3146.85 280.6753.92 33.57 57.747100.00 37.50 59.00 5990.80 5938.80 1756.85 2748.68 560990.32 6031129.73 70°29'44.1669"N 149°30'4.6392"W 1.42 180 0.75 -2.00 3205.58 289.03 54.7234.2057.817200.00 36.25 59.00 6070.79 6018.79 1787.75 2800.12 561041.51 6031161.04 70°29'44.4707"N 149°30'3.1249"W 1.25 -67.546 -1.25 0.00 3264.22 297.4555.53 34.82 57.847300.00 36.50 58.00 6151.31 6099.31 1818.74 2850.68 561091.83 6031192.42 70°29'44.7753"N 149°30'1.6362"W 0.64 0 0.25 -1.00 3322.28 305.91 56.34 35.44 57.867400.00 36.75 58.00 6231.56 6179.56 1850.36 2901.27 561142.16 6031224.43 70°29'45.0860"N 149°30'0.1468"W 0.25 180 0.25 0.00 3380.78 314.53 57.1536.06 57.877500.00 36.50 58.00 6311.82 6259.82 1881.97 2951.87 561192.50 6031256.43 70°29'45.3967"N149°29'58.6573"W0.25 180 -0.25 0.00 3439.29 323.27 57.95 36.69 57.877600.00 36.00 58.00 6392.46 6340.46 1913.30 3002.01 561242.40 6031288.15 70°29'45.7047"N149°29'57.1809"W0.50 -90.405 -0.50 0.00 3497.28 332.06 58.77 37.30 57.887700.00 36.00 57.00 6473.37 6421.37 1944.88 3051.58 561291.71 6031320.12 70°29'46.0151"N149°29'55.7214"W0.59 113.508 0.00 -1.00 3555.02 340.91 59.58 37.92 57.877800.00 35.75 58.00 6554.40 6502.40 1976.37 3101.01 561340.88 6031351.99 70°29'46.3245"N149°29'54.2663"W0.64 0 -0.25 1.00 3612.59 349.85 60.40 38.53 57.867900.00 35.75 58.00 6635.55 6583.55 2007.33 3150.55 561390.18 6031383.33 70°29'46.6288"N149°29'52.8075"W0.00 -90.406 0.00 0.00 3669.89 358.88 61.22 39.14 57.868000.00 35.75 57.00 6716.71 6664.71 2038.72 3199.83 561439.20 6031415.11 70°29'46.9373"N149°29'51.3568"W0.58 90.406 0.00 -1.00 3727.28 368.02 62.03 39.75 57.858100.00 35.75 58.00 6797.87 6745.87 2070.11 3249.10 561488.22 6031446.88 70°29'47.2458"N149°29'49.9060"W0.58 0 0.00 1.00 3784.67 377.29 62.85 40.35 57.848200.00 35.75 58.00 6879.03 6827.03 2101.07 3298.65 561537.52 6031478.22 70°29'47.5501"N149°29'48.4472"W0.00 -142.742 0.00 0.00 3841.97 386.66 63.67 40.96 57.858300.00 35.00 57.00 6960.57 6908.57 2132.17 3347.47 561586.10 6031509.70 70°29'47.8557"N149°29'47.0096"W0.95 -90.41 -0.75 -1.00 3898.84 396.07 64.49 41.57 57.848400.00 35.00 56.00 7042.48 6990.48 2163.83 3395.30 561633.67 6031541.73 70°29'48.1669"N149°29'45.6014"W0.57 90.41 0.00 -1.00 3955.36 405.51 65.32 42.17 57.818500.00 35.00 57.00 7124.40 7072.40 2195.49 3443.13 561681.25 6031573.76 70°29'48.4780"N149°29'44.1931"W0.57 0 0.00 1.00 4011.89 415.05 66.14 42.76 57.78 Tie On Point to MPC-118540.00 35.20 57.00 7157.12 7105.12 2208.01 3462.42 561700.44 6031586.43 70°29'48.6011"N149°29'43.6251"W0.50 -30.35 0.50 0.00 4034.52 416.97 66.46 43.01 57.77 Top of Whipstock8560.04 40.61 52.23 7172.93 7120.93 2215.16 3472.43 561710.39 6031593.66 70°29'48.6713"N149°29'43.3304"W30.69 -28.163 27.00 -23.80 4046.71 416.97 66.46 43.01 57.77 Int Az8590.76 52.85 44.27 7193.97 7141.97 2230.12 3488.95 561726.79 6031608.75 70°29'48.8184"N149°29'42.8438"W44.03 -43.29 39.84 -25.91 4068.99 416.98 66.48 43.03 57.77 Int Az8620.67 63.25 33.84 7209.80 7157.80 2249.84 3504.79 561742.47 6031628.59 70°29'49.0123"N149°29'42.3775"W45.59 -33.964 34.77 -34.87 4094.04 416.98 66.50 43.06 57.77 Int Az8650.68 75.54 25.51 7220.36 7168.36 2274.22 3518.58 561756.07 6031653.07 70°29'49.2519"N149°29'41.9711"W48.46 -39.434 40.95 -27.76 4120.79 416.99 66.52 43.10 57.778680.29 86.87 16.35 7224.89 7172.89 2301.49 3528.97 561766.25 6031680.41 70°29'49.5200"N149°29'41.6649"W48.94 -67.805 38.26 -30.94 4147.05 416.99 66.53 43.15 57.778710.51 88.80 11.64 7226.03 7174.03 2330.78 3536.27 561773.32 6031709.76 70°29'49.8081"N149°29'41.4496"W16.83 -74.138 6.39 -15.59 4172.44 417.00 66.54 43.19 57.778740.44 89.97 7.53 7226.36 7174.36 2360.28 3541.25 561778.07 6031739.30 70°29'50.0982"N149°29'41.3025"W14.28 -25.587 3.91 -13.73 4196.29 417.01 66.57 43.19 57.778770.51 90.68 7.19 7226.18 7174.18 2390.10 3545.11 561781.68 6031769.15 70°29'50.3915"N149°29'41.1887"W2.62 85.506 2.36 -1.13 4219.54 417.01 66.60 43.20 57.778800.63 90.98 11.03 7225.75 7173.75 2419.83 3549.87 561786.22 6031798.91 70°29'50.6839"N149°29'41.0479"W12.79 104.789 1.00 12.75 4243.39 417.02 66.64 43.21 57.778830.47 89.97 14.85 7225.50 7173.50 2448.91 3556.55 561792.67 6031828.04 70°29'50.9698"N149°29'40.8509"W13.24 95.972 -3.38 12.80 4268.18 417.03 66.69 43.22 57.778860.62 89.60 18.39 7225.61 7173.61 2477.80 3565.18 561801.07 6031856.99 70°29'51.2538"N149°29'40.5967"W11.81 95.608 -1.23 11.74 4294.26 417.04 66.75 43.23 57.768890.39 89.23 22.17 7225.92 7173.92 2505.71 3575.49 561811.16 6031884.98 70°29'51.5283"N149°29'40.2926"W12.76 91.648 -1.24 12.70 4320.91 417.05 66.80 43.25 57.768925.56 89.11 26.42 7226.43 7174.43 2537.76 3589.96 561825.37 6031917.13 70°29'51.8434"N149°29'39.8663"W12.09 87.465 -0.34 12.08 4353.41 417.07 66.86 43.26 57.768950.47 89.23 29.11 7226.79 7174.79 2559.80 3601.56 561836.80 6031939.26 70°29'52.0601"N149°29'39.5245"W10.81 86.774 0.48 10.80 4376.96 417.09 66.90 43.28 57.758980.54 89.42 32.46 7227.14 7175.14 2585.62 3616.95 561851.98 6031965.20 70°29'52.3140"N149°29'39.0712"W11.16 86.011 0.63 11.14 4405.87 417.10 66.95 43.29 57.759010.46 89.75 37.17 7227.36 7175.36 2610.18 3634.02 561868.87 6031989.89 70°29'52.5555"N149°29'38.5681"W15.78 91.942 1.10 15.74 4435.14 417.13 67.00 43.31 57.759040.52 89.60 41.62 7227.53 7175.53 2633.40 3653.10 561887.76 6032013.26 70°29'52.7838"N149°29'38.0064"W14.81 94.059 -0.50 14.80 4464.94 417.15 67.04 43.33 57.749070.51 89.29 46.01 7227.82 7175.82 2655.04 3673.85 561908.34 6032035.06 70°29'52.9964"N149°29'37.3950"W14.67 145.744 -1.03 14.64 4494.88 417.18 67.07 43.35 57.749100.64 87.94 46.93 7228.55 7176.55 2675.78 3695.69 561930.01 6032055.97 70°29'53.2003"N149°29'36.7519"W5.42 -96.187 -4.48 3.05 4525.00 417.21 67.10 43.37 57.749130.79 87.45 42.34 7229.76 7177.76 2697.21 3716.85 561951.00 6032077.56 70°29'53.4110"N149°29'36.1287"W15.30 -100.118 -1.63 -15.22 4555.10 417.24 67.13 43.40 57.739160.72 86.80 38.66 7231.26 7179.26 2719.94 3736.26 561970.23 6032100.44 70°29'53.6344"N149°29'35.5570"W12.47 -109.644 -2.17 -12.30 4584.81 417.28 67.17 43.42 57.739190.54 85.54 35.10 7233.26 7181.26 2743.73 3754.11 561987.90 6032124.37 70°29'53.8683"N149°29'35.0310"W12.64 -108.876 -4.23 -11.94 4614.12 417.31 67.22 43.45 57.739220.73 83.74 29.74 7236.08 7184.08 2769.10 3770.22 562003.81 6032149.85 70°29'54.1177"N149°29'34.5564"W18.65 -115.947 -5.96 -17.75 4643.24 417.35 67.28 43.48 57.729250.49 81.99 26.08 7239.78 7187.78 2795.18 3784.05 562017.42 6032176.05 70°29'54.3742"N149°29'34.1492"W13.55 -95.157 -5.88 -12.30 4671.18 417.38 67.34 43.51 57.729280.61 81.62 21.67 7244.07 7192.07 2822.44 3796.11 562029.27 6032203.39 70°29'54.6422"N149°29'33.7936"W14.54 -79.533 -1.23 -14.64 4698.65 417.42 67.42 43.54 57.719310.52 82.27 18.20 7248.26 7196.26 2850.27 3806.20 562039.14 6032231.30 70°29'54.9159"N149°29'33.4961"W11.69 -91.923 2.17 -11.60 4725.08 417.45 67.51 43.57 57.709340.72 82.14 13.52 7252.36 7200.36 2879.05 3814.38 562047.09 6032260.14 70°29'55.1988"N149°29'33.2550"W15.36 102.446 -0.43 -15.50 4750.75 417.48 67.61 43.61 57.709370.53 81.80 15.09 7256.53 7204.53 2907.65 3821.67 562054.16 6032288.79 70°29'55.4801"N149°29'33.0398"W5.34 81.867 -1.14 5.27 4775.67 417.51 67.72 43.64 57.699400.79 82.33 18.72 7260.71 7208.71 2936.32 3830.39 562062.65 6032317.53 70°29'55.7620"N149°29'32.7829"W12.01 35.78 1.75 12.00 4801.67 417.54 67.83 43.68 57.689430.38 85.70 21.15 7263.79 7211.79 2963.98 3840.42 562072.46 6032345.26 70°29'56.0339"N149°29'32.4871"W14.01 58.937 11.39 8.21 4827.93 417.58 67.94 43.71 57.689460.68 87.82 24.66 7265.50 7213.50 2991.84 3852.19 562084.02 6032373.21 70°29'56.3079"N149°29'32.1401"W13.52 83.916 7.00 11.58 4855.60 417.62 68.05 43.75 57.679490.65 88.25 28.65 7266.53 7214.53 3018.60 3865.63 562097.24 6032400.08 70°29'56.5710"N149°29'31.7442"W13.38 86.765 1.43 13.31 4883.73 417.67 68.16 43.79 57.669520.71 88.50 32.99 7267.38 7215.38 3044.40 3881.02 562112.43 6032425.99 70°29'56.8247"N149°29'31.2907"W14.46 83.292 0.83 14.44 4912.62 417.72 68.26 43.83 57.669550.63 89.05 37.63 7268.02 7216.02 3068.80 3898.30 562129.52 6032450.53 70°29'57.0646"N149°29'30.7815"W15.61 91.004 1.84 15.51 4941.93 417.77 68.34 43.87 57.659580.48 88.99 41.16 7268.54 7216.54 3091.86 3917.24 562148.28 6032473.73 70°29'57.2913"N149°29'30.2236"W11.83 -115.088 -0.20 11.83 4971.53 417.82 68.41 43.92 57.649610.60 87.30 37.54 7269.51 7217.51 3115.14 3936.33 562167.17 6032497.15 70°29'57.5201"N149°29'29.6614"W13.26 -76.702 -5.61 -12.02 5001.38 417.88 68.48 43.96 57.639640.54 88.16 33.92 7270.70 7218.70 3139.42 3953.79 562184.45 6032521.57 70°29'57.7588"N149°29'29.1468"W12.42 -90.945 2.87 -12.09 5030.74 417.94 68.57 44.00 57.639670.54 88.10 30.02 7271.68 7219.68 3164.85 3969.67 562200.12 6032547.12 70°29'58.0088"N149°29'28.6792"W12.99 -78.2 -0.20 -13.00 5059.73 418.00 68.67 44.05 57.629700.4988.7127.117272.517220.513191.143983.98562214.236032573.5270°29'58.2673"N149°29'28.2574"W9.92-77.3672.04-9.725088.17418.0668.7844.1057.61Page 2 of 3 9730.77 89.69 22.75 7272.93 7220.93 3218.59 3996.74 562226.77 6032601.07 70°29'58.5372"N149°29'27.8813"W14.76 -83.885 3.24 -14.40 5116.28 418.12 68.90 44.15 57.609760.74 90.12 18.74 7272.98 7220.98 3246.61 4007.35 562237.16 6032629.17 70°29'58.8127"N149°29'27.5684"W13.46 -110.404 1.43 -13.38 5143.21 418.17 69.04 44.19 57.599790.51 89.51 17.10 7273.08 7221.08 3274.94 4016.51 562246.10 6032657.56 70°29'59.0912"N149°29'27.2983"W5.88 118.956 -2.05 -5.51 5169.30 418.22 69.19 44.24 57.589820.84 87.88 20.05 7273.77 7221.77 3303.68 4026.17 562255.53 6032686.37 70°29'59.3738"N149°29'27.0136"W11.11 95.88 -5.37 9.73 5196.03 418.28 69.35 44.30 57.579850.49 87.51 23.69 7274.96 7222.96 3331.16 4037.20 562266.35 6032713.94 70°29'59.6441"N149°29'26.6883"W12.33 74.565 -1.25 12.28 5222.90 418.33 69.50 44.35 57.569880.46 88.43 27.01 7276.02 7224.02 3358.23 4050.02 562278.95 6032741.10 70°29'59.9102"N149°29'26.3104"W11.49 66.619 3.07 11.08 5250.79 418.40 69.65 44.40 57.559910.24 89.72 29.99 7276.51 7224.51 3384.39 4064.23 562292.95 6032767.37 70°30'0.1674"N149°29'25.8917"W10.90 73.502 4.33 10.01 5279.07 418.46 69.79 44.46 57.549940.41 90.86 33.84 7276.35 7224.35 3410.00 4080.18 562308.70 6032793.10 70°30'0.4191"N149°29'25.4219"W13.31 61.616 3.78 12.76 5308.23 418.54 69.91 44.52 57.539970.43 92.58 37.03 7275.45 7223.45 3434.44 4097.57 562325.90 6032817.68 70°30'0.6594"N149°29'24.9094"W12.07 91.682 5.73 10.63 5337.65 418.61 70.02 44.57 57.5210000.57 92.46 40.92 7274.13 7222.13 3457.84 4116.50 562344.65 6032841.23 70°30'0.8895"N149°29'24.3516"W12.90 70.739 -0.40 12.91 5367.48 418.69 70.12 44.63 57.5110031.92 93.62 44.26 7272.46 7220.46 3480.89 4137.69 562365.65 6032864.44 70°30'1.1160"N149°29'23.7276"W11.26 51.148 3.70 10.65 5398.70 418.78 70.21 44.69 57.5010060.74 94.15 44.92 7270.51 7218.51 3501.37 4157.87 562385.67 6032885.07 70°30'1.3173"N149°29'23.1329"W2.93 -58.928 1.84 2.29 5427.43 418.87 70.27 44.75 57.4910090.62 96.09 41.67 7267.84 7215.84 3523.02 4178.28 562405.90 6032906.88 70°30'1.5302"N149°29'22.5318"W12.63 -82.436 6.49 -10.88 5457.13 418.96 70.35 44.81 57.4810120.49 96.49 38.57 7264.57 7212.57 3545.72 4197.41 562424.85 6032929.73 70°30'1.7533"N149°29'21.9683"W10.40 -96.084 1.34 -10.38 5486.62 419.05 70.44 44.87 57.4710150.17 96.07 34.74 7261.32 7209.32 3569.39 4215.02 562442.27 6032953.53 70°30'1.9859"N149°29'21.4495"W12.90 -105.552 -1.42 -12.90 5515.67 419.14 70.55 44.93 57.4610180.27 95.29 31.95 7258.34 7206.34 3594.41 4231.48 562458.54 6032978.67 70°30'2.2319"N149°29'20.9644"W9.58 -54.628 -2.59 -9.27 5544.80 419.22 70.68 45.00 57.4410210.32 97.70 28.51 7254.94 7202.94 3620.20 4246.51 562473.36 6033004.58 70°30'2.4855"N149°29'20.5214"W13.92 -36.349 8.02 -11.45 5573.42 419.31 70.82 45.06 57.4310240.38 100.62 26.32 7250.16 7198.16 3646.53 4260.17 562486.82 6033031.02 70°30'2.7444"N149°29'20.1187"W12.09 -21.217 9.71 -7.29 5601.43 419.40 70.97 45.13 57.4210270.54 104.46 24.78 7243.61 7191.61 3673.09 4272.87 562499.31 6033057.67 70°30'3.0055"N149°29'19.7444"W13.67 -71.979 12.73 -5.11 5628.87 419.48 71.14 45.20 57.4010300.63 105.74 20.57 7235.77 7183.77 3699.88 4284.07 562510.29 6033084.55 70°30'3.2690"N149°29'19.4143"W14.16 -76.259 4.25 -13.99 5655.40 419.56 71.31 45.27 57.3910330.49 106.37 17.81 7227.51 7175.51 3726.98 4293.50 562519.51 6033111.72 70°30'3.5354"N149°29'19.1361"W9.13 -85.107 2.11 -9.24 5680.84 419.63 71.50 45.33 57.3810360.44 106.63 14.28 7219.00 7167.00 3754.57 4301.44 562527.23 6033139.37 70°30'3.8067"N149°29'18.9020"W11.33 -98.561 0.87 -11.79 5705.53 419.70 71.70 45.39 57.3610390.44 106.33 12.27 7210.49 7158.49 3782.57 4308.04 562533.62 6033167.41 70°30'4.0820"N149°29'18.7071"W6.50 -94.473 -1.00 -6.70 5729.53 419.77 71.92 45.46 57.3510420.44 106.05 8.90 7202.12 7150.12 3810.89 4313.33 562538.68 6033195.77 70°30'4.3605"N149°29'18.5508"W10.83 -77.164 -0.93 -11.23 5752.79 419.84 72.15 45.52 57.3310450.35 106.36 7.46 7193.77 7141.77 3839.32 4317.42 562542.55 6033224.22 70°30'4.6400"N149°29'18.4300"W4.74 134.726 1.04 -4.81 5775.25 419.90 72.38 45.59 57.3210480.42 104.05 9.85 7185.89 7133.89 3868.00 4321.79 562546.69 6033252.94 70°30'4.9221"N149°29'18.3009"W10.86 161.889 -7.68 7.95 5798.10 419.96 72.63 45.66 57.3010510.54 100.65 10.98 7179.45 7127.45 3896.93 4327.11 562551.79 6033281.91 70°30'5.2066"N149°29'18.1437"W11.87 175.039 -11.29 3.75 5821.80 420.03 72.88 45.73 57.2910540.51 97.45 11.26 7174.73 7122.73 3925.97 4332.82 562557.26 6033310.99 70°30'5.4922"N149°29'17.9752"W10.72 164.367 -10.68 0.93 5845.86 420.10 73.14 45.81 57.2710570.52 94.24 12.16 7171.68 7119.68 3955.20 4338.88 562563.09 6033340.26 70°30'5.7796"N149°29'17.7963"W11.10 173.216 -10.70 3.00 5870.31 420.17 73.40 45.89 57.2610600.68 90.37 12.62 7170.46 7118.46 3984.63 4345.34 562569.33 6033369.73 70°30'6.0690"N149°29'17.6054"W12.92 115.959 -12.83 1.53 5895.19 420.25 73.66 45.97 57.2410630.60 89.08 15.27 7170.61 7118.61 4013.66 4352.55 562576.31 6033398.82 70°30'6.3545"N149°29'17.3927"W9.85 129.545 -4.31 8.86 5920.34 420.33 73.92 46.06 57.2210660.62 86.65 18.22 7171.73 7119.73 4042.38 4361.19 562584.72 6033427.61 70°30'6.6369"N149°29'17.1378"W12.73 78.165 -8.09 9.83 5946.32 420.41 74.18 46.14 57.2010690.37 87.48 22.15 7173.25 7121.25 4070.26 4371.44 562594.75 6033455.56 70°30'6.9110"N149°29'16.8355"W13.48 83.22 2.79 13.21 5972.89 420.50 74.42 46.22 57.1910720.61 87.91 25.73 7174.47 7122.47 4097.87 4383.70 562606.79 6033483.27 70°30'7.1825"N149°29'16.4741"W11.91 106.898 1.42 11.84 6000.75 420.60 74.65 46.31 57.1710760.41 86.35 30.91 7176.46 7124.46 4132.85 4402.55 562625.37 6033518.39 70°30'7.5264"N149°29'15.9185"W13.58 73.896 -3.92 13.02 6038.45 420.75 74.92 46.42 57.1510780.63 86.83 32.57 7177.66 7125.66 4150.02 4413.17 562635.85 6033535.64 70°30'7.6952"N149°29'15.6056"W8.53 159.863 2.37 8.21 6057.95 420.82 75.05 46.48 57.1410810.70 82.18 34.29 7180.54 7128.54 4174.99 4429.65 562652.14 6033560.73 70°30'7.9407"N149°29'15.1198"W16.48 67.46 -15.46 5.72 6087.07 420.94 75.22 46.57 57.1210840.45 83.23 36.82 7184.32 7132.32 4199.00 4446.81 562669.10 6033584.87 70°30'8.1766"N149°29'14.6142"W9.14 66.314 3.53 8.50 6116.01 421.06 75.38 46.67 57.1010870.60 85.02 40.88 7187.41 7135.41 4222.35 4465.62 562687.73 6033608.37 70°30'8.4062"N149°29'14.0600"W14.65 83.002 5.94 13.47 6145.71 421.19 75.52 46.76 57.0910900.70 85.57 45.26 7189.88 7137.88 4244.25 4486.10 562708.03 6033630.43 70°30'8.6215"N149°29'13.4566"W14.62 76.683 1.83 14.55 6175.64 421.32 75.63 46.85 57.0710930.77 86.46 48.99 7191.97 7139.97 4264.66 4508.08 562729.85 6033651.01 70°30'8.8221"N149°29'12.8091"W12.72 85.286 2.96 12.40 6205.63 421.46 75.71 46.94 57.0610960.42 86.71 51.97 7193.73 7141.73 4283.49 4530.91 562752.53 6033670.02 70°30'9.0071"N149°29'12.1366"W10.07 83.392 0.84 10.05 6235.17 421.60 75.77 47.03 57.0410990.92 87.02 54.62 7195.40 7143.40 4301.69 4555.32 562776.80 6033688.41 70°30'9.1860"N149°29'11.4174"W8.73 110.768 1.02 8.69 6265.42 421.75 75.81 47.13 57.0311020.47 86.22 56.74 7197.14 7145.14 4318.32 4579.68 562801.03 6033705.22 70°30'9.3494"N149°29'10.6998"W7.66 0 -2.71 7.17 6294.55 421.89 75.82 47.22 57.0211050.0086.2256.747199.097147.094334.484604.32562825.536033721.5870°30'9.5082"N149°29'9.9741"W0.00N/A0.000.006323.57422.0475.8347.3157.01Projection to TDPage 3 of 3 Vert Uncert 1sd[ft]0.000.00Start MDEnd MDSurvey Date[ft][ft]52.008500.0003/03/218500.009730.7704/13/219730.7710225.0004/20/21MDTVDNorthEastGrid EastGrid NorthLatitudeLongitudeShape[ft][ft][ft][ft][US ft][US ft]N/A7149.002287.843736.43561973.796031668.4070°29'49.3849"N149°29'35.5583"WpolygonStart MDEnd MDIntervalStart TVDEnd TVDStart N/SStart E/WEnd N/SEnd E/W[ft][ft][ft][ft][ft][ft][ft][ft][ft]MDInclinationAzimuthTVDTVDSSNorthEastGrid EastGrid NorthLatitudeLongitudeDLSToolfaceBuild RateTurn RateVert SectMajor SemiMinor SemiVert SemiMinor AzimComments[ft][°][°][ft][ft][ft][ft][US ft][US ft][°/100ft][°][°/100ft][°/100ft][ft][ft][ft][ft][°]0.00 0.00 0.00 0.00 -52.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0052.00 0.00 0.00 52.00 0.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 48.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 0.42 0.42 1.32 0.00200.00 0.00 0.00 200.00 148.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 1.29 1.29 1.33 0.00300.00 0.00 0.00 300.00 248.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 2.16 2.16 1.36 0.00400.00 0.00 0.00 400.00 348.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.04 3.04 1.40 0.00500.00 0.00 0.00 500.00 448.00 0.00 0.00 558255.76 6029351.58 70°29'26.8939"N149°31'25.5425"W0.00 0 0.00 0.00 0.00 3.91 3.91 1.44 0.00600.00 0.25 332.00 600.00 548.00 0.19 -0.10 558255.66 6029351.77 70°29'26.8957"N149°31'25.5455"W0.25 180 0.25 0.00 0.06 4.78 4.78 1.50 332.00700.00 0.00 180.00 700.00 648.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.25 0 -0.25 0.00 0.11 5.65 5.65 1.56 152.00800.00 0.00 180.00 800.00 748.00 0.39 -0.20 558255.55 6029351.96 70°29'26.8976"N149°31'25.5485"W0.00 0 0.00 0.00 0.11 6.53 6.53 1.63 152.00900.00 0.25 244.00 900.00 848.00 0.29 -0.40 558255.36 6029351.87 70°29'26.8967"N149°31'25.5543"W0.25 180 0.25 0.00 -0.09 7.40 7.40 1.70 312.331000.00 0.00 180.00 1000.00 948.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.25 0 -0.25 0.00 -0.30 8.27 8.27 1.78 104.901100.00 0.00 180.00 1100.00 1048.00 0.19 -0.60 558255.16 6029351.77 70°29'26.8958"N149°31'25.5601"W0.00 0 0.00 0.00 -0.30 9.15 9.15 1.87 104.921200.00 0.25 124.00 1200.00 1148.00 0.07 -0.42 558255.34 6029351.65 70°29'26.8946"N149°31'25.5548"W0.25 -27.398 0.25 0.00 -0.25 10.02 10.02 1.96 109.351300.00 1.50 101.00 1299.98 1247.98 -0.30 1.05 558256.81 6029351.29 70°29'26.8909"N149°31'25.5116"W1.27 -39.835 1.25 -23.00 0.56 10.89 10.89 2.05 103.631400.00 3.75 76.00 1399.88 1347.88 0.24 5.51 558261.27 6029351.86 70°29'26.8962"N149°31'25.3804"W2.47 -6.438 2.25 -25.00 4.18 11.76 11.76 2.15 84.971500.00 7.00 73.00 1499.42 1447.42 2.82 14.51 558270.25 6029354.51 70°29'26.9215"N149°31'25.1155"W3.26 -11.846 3.25 -3.00 12.49 12.64 12.63 2.25 77.641600.00 10.50 69.00 1598.25 1546.25 7.86 28.85 558284.54 6029359.67 70°29'26.9712"N149°31'24.6936"W3.55 -23.708 3.50 -4.00 26.40 13.53 13.48 2.36 73.791700.00 12.50 65.00 1696.23 1644.23 15.70 47.17 558302.80 6029367.65 70°29'27.0483"N149°31'24.1546"W2.15 -28.755 2.00 -4.00 45.11 14.45 14.33 2.49 70.791800.00 15.50 59.00 1793.26 1741.26 27.16 68.43 558323.97 6029379.27 70°29'27.1610"N149°31'23.5287"W3.33 -15.229 3.00 -6.00 68.45 15.41 15.16 2.63 67.511900.00 17.75 57.00 1889.07 1837.07 42.35 92.67 558348.09 6029394.65 70°29'27.3103"N149°31'22.8154"W2.32 10.817 2.25 -2.00 96.50 16.44 15.99 2.81 64.562000.00 19.50 58.00 1983.83 1931.83 59.50 119.61 558374.89 6029412.01 70°29'27.4790"N149°31'22.0226"W1.78 -12.636 1.75 1.00 127.87 17.55 16.80 3.01 62.732100.00 23.00 56.00 2077.02 2025.02 79.27 149.98 558405.09 6029432.02 70°29'27.6735"N149°31'21.1292"W3.57 -9.787 3.50 -2.00 163.54 18.77 17.60 3.25 61.352200.00 25.50 55.00 2168.19 2116.19 102.55 183.81 558438.74 6029455.55 70°29'27.9024"N149°31'20.1335"W2.53 -9.052 2.50 -1.00 204.12 20.14 18.37 3.53 60.062300.00 28.50 54.00 2257.28 2205.28 128.92 220.75 558475.47 6029482.22 70°29'28.1617"N149°31'19.0464"W3.03 -24.593 3.00 -1.00 249.10 21.69 19.13 3.86 58.932400.00 30.75 52.00 2344.20 2292.20 158.69 260.21 558514.69 6029512.29 70°29'28.4545"N149°31'17.8854"W2.46 0 2.25 -2.00 298.23 23.44 19.87 4.23 57.822500.00 32.50 52.00 2429.35 2377.35 190.97 301.52 558555.75 6029544.89 70°29'28.7719"N149°31'16.6695"W1.75 0 1.75 0.00 350.44 25.40 20.60 4.65 56.832600.00 35.25 52.00 2512.37 2460.37 225.28 345.44 558599.39 6029579.54 70°29'29.1094"N149°31'15.3770"W2.75 15.17 2.75 0.00 405.94 27.60 21.30 5.12 56.072700.00 37.50 53.00 2592.88 2540.88 261.37 392.50 558646.16 6029615.99 70°29'29.4643"N149°31'13.9923"W2.33 -39.699 2.25 1.00 464.94 30.07 21.99 5.63 55.542800.00 38.25 52.00 2671.81 2619.81 298.75 441.20 558694.56 6029653.75 70°29'29.8318"N149°31'12.5590"W0.97 161.266 0.75 -1.00 526.02 32.78 22.67 6.18 55.132900.00 36.50 53.00 2751.28 2699.28 335.71 489.35 558742.42 6029691.08 70°29'30.1953"N149°31'11.1420"W1.85 0 -1.75 1.00 586.41 35.64 23.36 6.73 54.803000.00 37.00 53.00 2831.41 2779.41 371.72 537.13 558789.91 6029727.46 70°29'30.5494"N 149°31'9.7357"W 0.50 0 0.50 0.00 645.89 38.64 24.06 7.30 54.603100.00 37.00 53.00 2911.27 2859.27 407.94 585.20 558837.69 6029764.05 70°29'30.9056"N 149°31'8.3212"W 0.00 50.841 0.00 0.00 705.71 41.79 24.77 7.87 54.443200.00 37.50 54.00 2990.87 2938.87 443.94 633.85 558886.05 6029800.42 70°29'31.2596"N 149°31'6.8893"W 0.79 90.397 0.50 1.00 765.81 45.11 25.49 8.45 54.353300.00 37.50 55.00 3070.21 3018.21 479.29 683.41 558935.33 6029836.16 70°29'31.6072"N 149°31'5.4307"W 0.61 22.821 0.00 1.00 826.13 48.59 26.20 9.05 54.363400.00 39.00 56.00 3148.74 3096.74 514.34 734.44 558986.07 6029871.61 70°29'31.9519"N 149°31'3.9291"W 1.62 0 1.50 1.00 887.31 52.26 26.92 9.66 54.463500.00 39.75 56.00 3226.04 3174.04 549.82 787.03 559038.38 6029907.49 70°29'32.3007"N 149°31'2.3812"W 0.75 69.081 0.75 0.00 949.92 56.15 27.62 10.29 54.593600.00 40.00 57.00 3302.78 3250.78 585.20 840.49 559091.56 6029943.29 70°29'32.6487"N 149°31'0.8078"W 0.69 90.383 0.25 1.00 1013.10 60.23 28.3310.93 54.753700.0040.0058.003379.393327.39619.74894.70559145.496029978.2570°29'32.9883"N149°30'59.2124"W0.641800.001.001076.2464.4629.0411.5854.961String / DiameterWellboreBH CoilTrak (2019) (Standard) MPC-11APB2 CoilTrak MWD<9750-xx> MPC-11APB2Target NameCommentOWSG Camera Based Film Gyro Multi-Shot rev1 MPC-11 CB-Film-GMS <0-8990> MPC-11BH CoilTrak (2019) (Standard) MPC-11APB1 CoilTrak MWD<8540-11051> MPC-11APB1Positional Uncertainty Model Log Name / CommentWellbore149°31'25.5425"W149°31'31.8215"W149°31'31.8215"WHoriz Uncert 1sd[ft]0.000.00[US ft]6029351.586027347.716027347.71Latitude70°29'26.8939"N70°29'7.2002"N70°29'7.2002"N[ft]213.38Grid East[US ft]558255.76558058.04558058.04Slot LocationFacility Reference PtField Reference PtLocal North[ft]2002.4646.73°included52.00 ftLocal East Grid North LongitudeSection AzimuthSurface Position UncertaintyEllipse Starting MDNAD27 / TM Alaska SP, Zone 4 (5004), US feetTrue0.9999040.45 EastSlotRig on MPC-11 (RT)Rig on MPC-11 (RT)Mean Sea Level52.00 ft52.00 ft52.00 ftE 0.00 ftN 0.00 ftMagnetic North is 15.69 degrees East of True North2.00Std DevWA_ANC_DefnProjection SystemNorth ReferenceScaleConvergence at SlotHorizontal Reference PointVertical Reference PointMD Reference PointField Vertical ReferenceRig on MPC-11 (RT) To Facility Vertical DatumRig on MPC-11 (RT) To Mean Sea LevelRig on MPC-11 (RT) to Ground Level at Slot (MPC-11)Section Origin XSection Origin YDeclinationEllipse Confidence LimitDatabase04/23/21 at 13:41 using WellArchitect 6.0Hilcorp Alaska, LLCNorth Slope, AlaskaMilne PointMPU C PadMPC-11MPC-11AMPC-11APB2MPC-11APB204/21/2021MPC-11APB1 at 9730.77 MDUlricardMinimum curvatureWellpathWellbore last revised Sidetrack fromUserCalculation methodFieldFacilitySlotWellWellboreActual Wellpath Geographic Report - including Position UncertaintyReport by Baker HughesOperatorAreaPage 1 of 3 3800.00 39.75 58.00 3456.13 3404.13 653.71 949.07 559199.59 6030012.64 70°29'33.3223"N149°30'57.6122"W0.25 0 -0.25 0.00 1139.12 68.83 29.75 12.22 55.193900.00 40.75 58.00 3532.45 3480.45 687.95 1003.86 559254.11 6030047.30 70°29'33.6590"N149°30'55.9995"W1.00 69.471 1.00 0.00 1202.48 73.37 30.46 12.88 55.394000.00 41.00 59.00 3608.07 3556.07 722.14 1059.66 559309.63 6030081.93 70°29'33.9951"N149°30'54.3573"W0.70 -79.993 0.25 1.00 1266.55 78.11 31.18 13.55 55.604100.00 41.25 57.00 3683.40 3631.40 756.99 1115.43 559365.12 6030117.21 70°29'34.3378"N149°30'52.7159"W1.34 0 0.25 -2.00 1331.04 83.03 31.89 14.22 55.764200.00 41.50 57.00 3758.44 3706.44 792.99 1170.86 559420.26 6030153.64 70°29'34.6918"N149°30'51.0843"W0.25 111.093 0.25 0.00 1396.08 88.11 32.60 14.90 55.844300.00 41.25 58.00 3833.48 3781.48 828.51 1226.61 559475.72 6030189.59 70°29'35.0410"N149°30'49.4436"W0.71 0 -0.25 1.00 1461.01 93.34 33.32 15.59 55.944400.00 42.00 58.00 3908.23 3856.23 863.71 1282.94 559531.77 6030225.23 70°29'35.3871"N149°30'47.7856"W0.75 0 0.75 0.00 1526.15 98.74 34.03 16.27 56.074500.00 42.00 58.00 3982.54 3930.54 899.16 1339.69 559588.23 6030261.12 70°29'35.7357"N149°30'46.1154"W0.00 70.346 0.00 0.00 1591.78 104.33 34.75 16.97 56.184600.00 42.50 60.00 4056.57 4004.57 933.79 1397.32 559645.58 6030296.19 70°29'36.0761"N149°30'44.4191"W1.43 -156.434 0.50 2.00 1657.47 110.08 35.46 17.67 56.344700.00 41.00 59.00 4131.17 4079.17 967.57 1454.69 559702.68 6030330.42 70°29'36.4082"N149°30'42.7304"W1.64 180 -1.50 -1.00 1722.40 115.93 36.18 18.36 56.514800.00 40.50 59.00 4206.93 4154.93 1001.19 1510.64 559758.37 6030364.48 70°29'36.7388"N149°30'41.0835"W0.50 -69.375 -0.50 0.00 1786.19 121.82 36.92 19.04 56.644900.00 40.75 58.00 4282.83 4230.83 1035.21 1566.16 559813.61 6030398.93 70°29'37.0732"N149°30'39.4495"W0.70 90.379 0.25 -1.00 1849.93 127.83 37.67 19.72 56.735000.00 40.75 59.00 4358.59 4306.59 1069.32 1621.81 559868.99 6030433.47 70°29'37.4085"N149°30'37.8113"W0.65 111.384 0.00 1.00 1913.83 134.00 38.41 20.40 56.825100.00 40.50 60.00 4434.49 4382.49 1102.36 1677.91 559924.82 6030466.95 70°29'37.7334"N149°30'36.1600"W0.70 -90.38 -0.25 1.00 1977.33 140.29 39.15 21.08 56.955200.00 40.50 59.00 4510.53 4458.53 1135.33 1733.87 559980.51 6030500.34 70°29'38.0575"N149°30'34.5129"W0.65 180 0.00 -1.00 2040.66 146.71 39.90 21.76 57.075300.00 40.00 59.00 4586.85 4534.85 1168.60 1789.25 560035.63 6030534.05 70°29'38.3846"N149°30'32.8827"W0.50 0 -0.50 0.00 2103.80 153.23 40.66 22.43 57.155400.00 40.00 59.00 4663.46 4611.46 1201.71 1844.35 560090.46 6030567.58 70°29'38.7101"N149°30'31.2609"W0.00 180 0.00 0.00 2166.61 159.85 41.42 23.10 57.235500.00 39.25 59.00 4740.48 4688.48 1234.56 1899.02 560144.86 6030600.85 70°29'39.0330"N149°30'29.6517"W0.75 0 -0.75 0.00 2228.93 166.57 42.18 23.77 57.315600.00 40.00 59.00 4817.50 4765.50 1267.40 1953.68 560199.26 6030634.12 70°29'39.3559"N149°30'28.0426"W0.75 -52.648 0.75 0.00 2291.24 173.41 42.95 24.43 57.385700.00 40.50 58.00 4893.82 4841.82 1301.16 2008.77 560254.08 6030668.31 70°29'39.6878"N149°30'26.4210"W0.82 0 0.50 -1.00 2354.50 180.48 43.71 25.11 57.425800.00 40.75 58.00 4969.72 4917.72 1335.67 2063.99 560309.02 6030703.24 70°29'40.0269"N149°30'24.7956"W0.25 0 0.25 0.00 2418.35 187.74 44.47 25.80 57.455900.00 41.25 58.00 5045.19 4993.19 1370.43 2119.62 560364.37 6030738.44 70°29'40.3687"N149°30'23.1578"W0.50 180 0.50 0.00 2482.69 195.19 45.22 26.49 57.476000.00 39.75 58.00 5121.23 5069.23 1404.85 2174.70 560419.17 6030773.28 70°29'40.7070"N149°30'21.5365"W1.50 180 -1.50 0.00 2546.38 202.71 45.98 27.17 57.496100.00 38.75 58.00 5198.67 5146.67 1438.38 2228.35 560472.56 6030807.23 70°29'41.0366"N149°30'19.9570"W1.00 180 -1.00 0.00 2608.43 210.17 46.76 27.83 57.516200.00 38.50 58.00 5276.80 5224.80 1471.45 2281.29 560525.23 6030840.72 70°29'41.3617"N149°30'18.3987"W0.25 -180 -0.25 0.00 2669.65 217.67 47.54 28.48 57.536300.00 37.25 58.00 5355.73 5303.73 1503.99 2333.35 560577.03 6030873.65 70°29'41.6815"N149°30'16.8660"W1.25 0 -1.25 0.00 2729.86 225.17 48.33 29.12 57.546400.00 37.50 58.00 5435.20 5383.20 1536.15 2384.83 560628.25 6030906.22 70°29'41.9977"N149°30'15.3506"W0.25 -68.127 0.25 0.00 2789.39 232.71 49.13 29.76 57.566500.00 37.75 57.00 5514.40 5462.40 1568.96 2436.32 560679.47 6030939.42 70°29'42.3202"N149°30'13.8349"W0.66 0 0.25 -1.00 2849.36 240.42 49.93 30.39 57.566600.00 38.25 57.00 5593.20 5541.20 1602.49 2487.95 560730.84 6030973.35 70°29'42.6498"N149°30'12.3148"W0.50 180 0.50 0.00 2909.94 248.32 50.72 31.04 57.546700.00 38.00 57.00 5671.87 5619.87 1636.11 2539.73 560782.35 6031007.38 70°29'42.9803"N149°30'10.7905"W0.25 113.001 -0.25 0.00 2970.69 256.37 51.51 31.68 57.526800.00 37.50 59.00 5750.94 5698.94 1668.56 2591.64 560834.00 6031040.22 70°29'43.2992"N 149°30'9.2623"W 1.32 120.173 -0.50 2.00 3030.72 264.4752.31 32.32 57.546900.00 36.50 62.00 5830.81 5778.81 1698.20 2644.00 560886.11 6031070.27 70°29'43.5905"N 149°30'7.7210"W 2.06 -67.665 -1.00 3.00 3089.16 272.5553.11 32.95 57.637000.00 36.75 61.00 5911.06 5859.06 1726.67 2696.42 560938.31 6031099.15 70°29'43.8703"N 149°30'6.1776"W 0.65 -58.947 0.25 -1.00 3146.85 280.6753.92 33.57 57.747100.00 37.50 59.00 5990.80 5938.80 1756.85 2748.68 560990.32 6031129.73 70°29'44.1669"N 149°30'4.6392"W 1.42 180 0.75 -2.00 3205.58 289.03 54.7234.2057.817200.00 36.25 59.00 6070.79 6018.79 1787.75 2800.12 561041.51 6031161.04 70°29'44.4707"N 149°30'3.1249"W 1.25 -67.546 -1.25 0.00 3264.22 297.4555.53 34.82 57.847300.00 36.50 58.00 6151.31 6099.31 1818.74 2850.68 561091.83 6031192.42 70°29'44.7753"N 149°30'1.6362"W 0.64 0 0.25 -1.00 3322.28 305.91 56.34 35.44 57.867400.00 36.75 58.00 6231.56 6179.56 1850.36 2901.27 561142.16 6031224.43 70°29'45.0860"N 149°30'0.1468"W 0.25 180 0.25 0.00 3380.78 314.53 57.1536.06 57.877500.00 36.50 58.00 6311.82 6259.82 1881.97 2951.87 561192.50 6031256.43 70°29'45.3967"N149°29'58.6573"W0.25 180 -0.25 0.00 3439.29 323.27 57.95 36.69 57.877600.00 36.00 58.00 6392.46 6340.46 1913.30 3002.01 561242.40 6031288.15 70°29'45.7047"N149°29'57.1809"W0.50 -90.405 -0.50 0.00 3497.28 332.06 58.77 37.30 57.887700.00 36.00 57.00 6473.37 6421.37 1944.88 3051.58 561291.71 6031320.12 70°29'46.0151"N149°29'55.7214"W0.59 113.508 0.00 -1.00 3555.02 340.91 59.58 37.92 57.877800.00 35.75 58.00 6554.40 6502.40 1976.37 3101.01 561340.88 6031351.99 70°29'46.3245"N149°29'54.2663"W0.64 0 -0.25 1.00 3612.59 349.85 60.40 38.53 57.867900.00 35.75 58.00 6635.55 6583.55 2007.33 3150.55 561390.18 6031383.33 70°29'46.6288"N149°29'52.8075"W0.00 -90.406 0.00 0.00 3669.89 358.88 61.22 39.14 57.868000.00 35.75 57.00 6716.71 6664.71 2038.72 3199.83 561439.20 6031415.11 70°29'46.9373"N149°29'51.3568"W0.58 90.406 0.00 -1.00 3727.28 368.02 62.03 39.75 57.858100.00 35.75 58.00 6797.87 6745.87 2070.11 3249.10 561488.22 6031446.88 70°29'47.2458"N149°29'49.9060"W0.58 0 0.00 1.00 3784.67 377.29 62.85 40.35 57.848200.00 35.75 58.00 6879.03 6827.03 2101.07 3298.65 561537.52 6031478.22 70°29'47.5501"N149°29'48.4472"W0.00 -142.742 0.00 0.00 3841.97 386.66 63.67 40.96 57.858300.00 35.00 57.00 6960.57 6908.57 2132.17 3347.47 561586.10 6031509.70 70°29'47.8557"N149°29'47.0096"W0.95 -90.41 -0.75 -1.00 3898.84 396.07 64.49 41.57 57.848400.00 35.00 56.00 7042.48 6990.48 2163.83 3395.30 561633.67 6031541.73 70°29'48.1669"N149°29'45.6014"W0.57 90.41 0.00 -1.00 3955.36 405.51 65.32 42.17 57.818500.00 35.00 57.00 7124.40 7072.40 2195.49 3443.13 561681.25 6031573.76 70°29'48.4780"N149°29'44.1931"W0.57 0 0.00 1.00 4011.89 415.05 66.14 42.76 57.78 Tie On Point to MPC-118540.00 35.20 57.00 7157.12 7105.12 2208.01 3462.42 561700.44 6031586.43 70°29'48.6011"N149°29'43.6251"W0.50 -30.35 0.50 0.00 4034.52 416.97 66.46 43.01 57.77 Top of Whipstock8560.04 40.61 52.23 7172.93 7120.93 2215.16 3472.43 561710.39 6031593.66 70°29'48.6713"N149°29'43.3304"W30.69 -28.163 27.00 -23.80 4046.71 416.97 66.46 43.01 57.77 Int Az8590.76 52.85 44.27 7193.97 7141.97 2230.12 3488.95 561726.79 6031608.75 70°29'48.8184"N149°29'42.8438"W44.03 -43.29 39.84 -25.91 4068.99 416.98 66.48 43.03 57.77 Int Az8620.67 63.25 33.84 7209.80 7157.80 2249.84 3504.79 561742.47 6031628.59 70°29'49.0123"N149°29'42.3775"W45.59 -33.964 34.77 -34.87 4094.04 416.98 66.50 43.06 57.77 Int Az8650.68 75.54 25.51 7220.36 7168.36 2274.22 3518.58 561756.07 6031653.07 70°29'49.2519"N149°29'41.9711"W48.46 -39.434 40.95 -27.76 4120.79 416.99 66.52 43.10 57.778680.29 86.87 16.35 7224.89 7172.89 2301.49 3528.97 561766.25 6031680.41 70°29'49.5200"N149°29'41.6649"W48.94 -67.805 38.26 -30.94 4147.05 416.99 66.53 43.15 57.778710.51 88.80 11.64 7226.03 7174.03 2330.78 3536.27 561773.32 6031709.76 70°29'49.8081"N149°29'41.4496"W16.83 -74.138 6.39 -15.59 4172.44 417.00 66.54 43.19 57.778740.44 89.97 7.53 7226.36 7174.36 2360.28 3541.25 561778.07 6031739.30 70°29'50.0982"N149°29'41.3025"W14.28 -25.587 3.91 -13.73 4196.29 417.01 66.57 43.19 57.778770.51 90.68 7.19 7226.18 7174.18 2390.10 3545.11 561781.68 6031769.15 70°29'50.3915"N149°29'41.1887"W2.62 85.506 2.36 -1.13 4219.54 417.01 66.60 43.20 57.778800.63 90.98 11.03 7225.75 7173.75 2419.83 3549.87 561786.22 6031798.91 70°29'50.6839"N149°29'41.0479"W12.79 104.789 1.00 12.75 4243.39 417.02 66.64 43.21 57.778830.47 89.97 14.85 7225.50 7173.50 2448.91 3556.55 561792.67 6031828.04 70°29'50.9698"N149°29'40.8509"W13.24 95.972 -3.38 12.80 4268.18 417.03 66.69 43.22 57.778860.62 89.60 18.39 7225.61 7173.61 2477.80 3565.18 561801.07 6031856.99 70°29'51.2538"N149°29'40.5967"W11.81 95.608 -1.23 11.74 4294.26 417.04 66.75 43.23 57.768890.39 89.23 22.17 7225.92 7173.92 2505.71 3575.49 561811.16 6031884.98 70°29'51.5283"N149°29'40.2926"W12.76 91.648 -1.24 12.70 4320.91 417.05 66.80 43.25 57.768925.56 89.11 26.42 7226.43 7174.43 2537.76 3589.96 561825.37 6031917.13 70°29'51.8434"N149°29'39.8663"W12.09 87.465 -0.34 12.08 4353.41 417.07 66.86 43.26 57.768950.47 89.23 29.11 7226.79 7174.79 2559.80 3601.56 561836.80 6031939.26 70°29'52.0601"N149°29'39.5245"W10.81 86.774 0.48 10.80 4376.96 417.09 66.90 43.28 57.758980.54 89.42 32.46 7227.14 7175.14 2585.62 3616.95 561851.98 6031965.20 70°29'52.3140"N149°29'39.0712"W11.16 86.011 0.63 11.14 4405.87 417.10 66.95 43.29 57.759010.46 89.75 37.17 7227.36 7175.36 2610.18 3634.02 561868.87 6031989.89 70°29'52.5555"N149°29'38.5681"W15.78 91.942 1.10 15.74 4435.14 417.13 67.00 43.31 57.759040.52 89.60 41.62 7227.53 7175.53 2633.40 3653.10 561887.76 6032013.26 70°29'52.7838"N149°29'38.0064"W14.81 94.059 -0.50 14.80 4464.94 417.15 67.04 43.33 57.749070.51 89.29 46.01 7227.82 7175.82 2655.04 3673.85 561908.34 6032035.06 70°29'52.9964"N149°29'37.3950"W14.67 145.744 -1.03 14.64 4494.88 417.18 67.07 43.35 57.749100.64 87.94 46.93 7228.55 7176.55 2675.78 3695.69 561930.01 6032055.97 70°29'53.2003"N149°29'36.7519"W5.42 -96.187 -4.48 3.05 4525.00 417.21 67.10 43.37 57.749130.79 87.45 42.34 7229.76 7177.76 2697.21 3716.85 561951.00 6032077.56 70°29'53.4110"N149°29'36.1287"W15.30 -100.118 -1.63 -15.22 4555.10 417.24 67.13 43.40 57.739160.72 86.80 38.66 7231.26 7179.26 2719.94 3736.26 561970.23 6032100.44 70°29'53.6344"N149°29'35.5570"W12.47 -109.644 -2.17 -12.30 4584.81 417.28 67.17 43.42 57.739190.54 85.54 35.10 7233.26 7181.26 2743.73 3754.11 561987.90 6032124.37 70°29'53.8683"N149°29'35.0310"W12.64 -108.876 -4.23 -11.94 4614.12 417.31 67.22 43.45 57.739220.73 83.74 29.74 7236.08 7184.08 2769.10 3770.22 562003.81 6032149.85 70°29'54.1177"N149°29'34.5564"W18.65 -115.947 -5.96 -17.75 4643.24 417.35 67.28 43.48 57.729250.49 81.99 26.08 7239.78 7187.78 2795.18 3784.05 562017.42 6032176.05 70°29'54.3742"N149°29'34.1492"W13.55 -95.157 -5.88 -12.30 4671.18 417.38 67.34 43.51 57.729280.61 81.62 21.67 7244.07 7192.07 2822.44 3796.11 562029.27 6032203.39 70°29'54.6422"N149°29'33.7936"W14.54 -79.533 -1.23 -14.64 4698.65 417.42 67.42 43.54 57.719310.52 82.27 18.20 7248.26 7196.26 2850.27 3806.20 562039.14 6032231.30 70°29'54.9159"N149°29'33.4961"W11.69 -91.923 2.17 -11.60 4725.08 417.45 67.51 43.57 57.709340.72 82.14 13.52 7252.36 7200.36 2879.05 3814.38 562047.09 6032260.14 70°29'55.1988"N149°29'33.2550"W15.36 102.446 -0.43 -15.50 4750.75 417.48 67.61 43.61 57.709370.53 81.80 15.09 7256.53 7204.53 2907.65 3821.67 562054.16 6032288.79 70°29'55.4801"N149°29'33.0398"W5.34 81.867 -1.14 5.27 4775.67 417.51 67.72 43.64 57.699400.79 82.33 18.72 7260.71 7208.71 2936.32 3830.39 562062.65 6032317.53 70°29'55.7620"N149°29'32.7829"W12.01 35.78 1.75 12.00 4801.67 417.54 67.83 43.68 57.689430.38 85.70 21.15 7263.79 7211.79 2963.98 3840.42 562072.46 6032345.26 70°29'56.0339"N149°29'32.4871"W14.01 58.937 11.39 8.21 4827.93 417.58 67.94 43.71 57.689460.68 87.82 24.66 7265.50 7213.50 2991.84 3852.19 562084.02 6032373.21 70°29'56.3079"N149°29'32.1401"W13.52 83.916 7.00 11.58 4855.60 417.62 68.05 43.75 57.679490.65 88.25 28.65 7266.53 7214.53 3018.60 3865.63 562097.24 6032400.08 70°29'56.5710"N149°29'31.7442"W13.38 86.765 1.43 13.31 4883.73 417.67 68.16 43.79 57.669520.71 88.50 32.99 7267.38 7215.38 3044.40 3881.02 562112.43 6032425.99 70°29'56.8247"N149°29'31.2907"W14.46 83.292 0.83 14.44 4912.62 417.72 68.26 43.83 57.669550.63 89.05 37.63 7268.02 7216.02 3068.80 3898.30 562129.52 6032450.53 70°29'57.0646"N149°29'30.7815"W15.61 91.004 1.84 15.51 4941.93 417.77 68.34 43.87 57.659580.48 88.99 41.16 7268.54 7216.54 3091.86 3917.24 562148.28 6032473.73 70°29'57.2913"N149°29'30.2236"W11.83 -115.088 -0.20 11.83 4971.53 417.82 68.41 43.92 57.649610.60 87.30 37.54 7269.51 7217.51 3115.14 3936.33 562167.17 6032497.15 70°29'57.5201"N149°29'29.6614"W13.26 -76.702 -5.61 -12.02 5001.38 417.88 68.48 43.96 57.639640.54 88.16 33.92 7270.70 7218.70 3139.42 3953.79 562184.45 6032521.57 70°29'57.7588"N149°29'29.1468"W12.42 -90.945 2.87 -12.09 5030.74 417.94 68.57 44.00 57.639670.5488.1030.027271.687219.683164.853969.67562200.126032547.1270°29'58.0088"N149°29'28.6792"W12.99-78.2-0.20-13.005059.73418.0068.6744.0557.62Page 2 of 3 9700.49 88.71 27.11 7272.51 7220.51 3191.14 3983.98 562214.23 6032573.52 70°29'58.2673"N149°29'28.2574"W9.92 -77.367 2.04 -9.72 5088.17 418.06 68.78 44.10 57.619730.77 89.69 22.75 7272.93 7220.93 3218.59 3996.74 562226.77 6032601.07 70°29'58.5372"N149°29'27.8813"W14.76 -84.031 3.24 -14.40 5116.28 418.12 68.90 44.15 57.60 Tie on Point9750.00 89.96 20.17 7272.99 7220.99 3236.49 4003.77 562233.66 6032619.01 70°29'58.7131"N149°29'27.6739"W13.49 20.994 1.40 -13.42 5133.66 418.23 69.25 44.15 57.62 KOP, Top of Billet9780.49 92.46 21.13 7272.35 7220.35 3265.01 4014.52 562244.19 6032647.62 70°29'58.9936"N149°29'27.3571"W8.78 -87.625 8.20 3.15 5161.04 418.26 69.34 44.16 57.619810.51 92.61 17.38 7271.02 7219.02 3293.32 4024.41 562253.85 6032676.00 70°29'59.2719"N149°29'27.0655"W12.49 -83.516 0.50 -12.49 5187.65 418.30 69.43 44.16 57.609841.86 92.98 14.08 7269.49 7217.49 3323.45 4032.90 562262.10 6032706.20 70°29'59.5683"N149°29'26.8151"W10.58 35.1 1.18 -10.53 5214.48 418.33 69.54 44.16 57.609871.27 94.37 15.06 7267.61 7215.61 3351.86 4040.28 562269.26 6032734.66 70°29'59.8476"N149°29'26.5973"W5.78 83.115 4.73 3.33 5239.33 418.36 69.65 44.17 57.599900.38 94.74 18.19 7265.29 7213.29 3379.66 4048.58 562277.34 6032762.52 70°30'0.1209"N149°29'26.3525"W10.79 96.476 1.27 10.75 5264.43 418.40 69.76 44.17 57.589930.44 94.34 21.65 7262.91 7210.91 3407.83 4058.79 562287.33 6032790.76 70°30'0.3979"N149°29'26.0515"W11.55 89.881 -1.33 11.51 5291.17 418.43 69.88 44.18 57.589960.57 94.34 24.79 7260.63 7208.63 3435.43 4070.63 562298.96 6032818.46 70°30'0.6694"N149°29'25.7024"W10.39 88.475 0.00 10.42 5318.72 418.47 69.99 44.19 57.579990.37 94.43 28.53 7258.35 7206.35 3461.98 4083.96 562312.08 6032845.11 70°30'0.9304"N149°29'25.3095"W12.52 94.551 0.30 12.55 5346.62 418.52 70.09 44.20 57.5610020.53 94.21 31.24 7256.08 7204.08 3488.06 4098.95 562326.85 6032871.30 70°30'1.1867"N149°29'24.8680"W8.99 90.419 -0.73 8.99 5375.40 418.56 70.19 44.21 57.5610050.52 94.17 35.29 7253.89 7201.89 3513.06 4115.35 562343.06 6032896.43 70°30'1.4325"N149°29'24.3847"W13.47 96.754 -0.13 13.50 5404.49 418.61 70.28 44.22 57.5510080.86 93.93 37.30 7251.75 7199.75 3537.45 4133.26 562360.78 6032920.95 70°30'1.6723"N149°29'23.8569"W6.66 -44.359 -0.79 6.62 5434.25 418.67 70.36 44.23 57.5410113.78 94.46 36.78 7249.34 7197.34 3563.66 4153.04 562380.35 6032947.31 70°30'1.9299"N149°29'23.2742"W2.25 -74.98 1.61 -1.58 5466.61 418.73 70.45 44.25 57.5310143.48 95.36 33.38 7246.79 7194.79 3587.87 4170.04 562397.16 6032971.65 70°30'2.1680"N149°29'22.7732"W11.80 -74.655 3.03 -11.45 5495.59 418.78 70.54 44.27 57.5210170.23 96.12 30.57 7244.12 7192.12 3610.44 4184.14 562411.07 6032994.34 70°30'2.3899"N149°29'22.3579"W10.83 0 2.84 -10.50 5521.32 418.83 70.62 44.28 57.5210225.0096.1230.577238.287186.283657.334211.83562438.406033041.4470°30'2.8509"N149°29'21.5417"W0.00N/A0.000.005573.63418.9470.8244.3257.50Projection to TDPage 3 of 3 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 777-8510. Received By: Date: Date: 05/20/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-11A, MPU C-11APB1, MPU C-11APB2 (PTD 221-001) FINAL LWD FORMATION EVALUATION LOGS (04/10/2021 to 04/22/2021) •Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) •Final Definitive Directional Survey SFTP Transfer - Data Folders: Please include current contact information if different from above. PTD: 2210010 E-Set: 35146 05/21/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 777-8510. Received By: Date: Date: 05/20/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-11A, MPU C-11APB1, MPU C-11APB2 (PTD 221-0001) FINAL LWD FORMATION EVALUATION LOGS (04/10/2021 to 04/22/2021) •Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) •Final Definitive Directional Survey SFTP Transfer - Data Folders: Please include current contact information if different from above. PTD: 2210010 E-Set: 35147 05/21/2021 David Douglas Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or fax to 907 777-8510. Received By: Date: Date: 05/20/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-11A, MPU C-11APB1, MPU C-11APB2 (PTD 221-0001) FINAL LWD FORMATION EVALUATION LOGS (04/10/2021 to 04/22/2021) •Multiple Propagation Resistivity & Gamma Ray (2” & 5” MD/TVD Color Logs) •Final Definitive Directional Survey SFTP Transfer - Data Folders: Please include current contact information if different from above. PTD: 2210010 E-Set: 35148 05/21/2021 1 Guhl, Meredith D (CED) From:Regg, James B (CED) Sent:Thursday, May 13, 2021 11:01 AM To:Wallace, Chris D (CED); Rixse, Melvin G (CED) Subject:FW: Hilcorp MPU C-11 (PTD#221-001) IA Pressure Exceedance No action needed from us. Artificial lift is outside the SCP rules. Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907‐793‐1236 From: David Haakinson <dhaakinson@hilcorp.com> Sent: Wednesday, May 12, 2021 4:29 PM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Chad Helgeson <chelgeson@hilcorp.com>; Alaska NS ‐ Milne ‐ Foreman <AlaskaNS‐Milne‐Foreman@hilcorp.com>; Alaska NS ‐ Milne ‐ Field Operator Leads <AlaskaNS‐Milne‐FieldOperatorLeads@hilcorp.com>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Jon Arend <Jon.Arend@hilcorp.com>; Alaska NS ‐ Wells Foreman <AlaskaNS‐ WellsForeman@hilcorp.com> Subject: Hilcorp MPU C‐11 (PTD#221‐001) IA Pressure Exceedance Jim, I was notified this afternoon that lift‐gas producer MPU C‐11A (PTD # 221‐001) was temporarily operating with an IA pressure above 2,000 psi at 2,150 psi. The readings given to me were T/I/O pressures of 294/2150/590 psi. The well passed an MIT‐IA to 2,602 psi on 12/26/2020 prior to being converted to production following coiled tubing drilling in April 2021. Producer C‐11A has been stable and operating at 1,900 to 1,950 psi, but has had occasional exceedances above 2,000 psi in the past few days during the gas lift unloading. Per my discussion with operations, the exceedances were temporary and corrected by the man‐watch crew. The well is being man‐watched while we await the permanent gas lift tie‐in and installation of real‐time IA gauge monitoring. The operating pressure was recorded and verified by operations and the wells team as 1,900 psi this morning. The higher than normal gas lift injection pressure is due to a deep lifting point on the well and unloading from a single point mandrel. After discussion, the gas lift rate was also found to be over‐lifting and fluctuating, thus the cause for temporary exceedance. After contact from Jon Arend, I contacted the operator and asked for a gas lift rate decrease which brought the pressure to 1,900 psi. I requested the IA pressure be maintained below 2,000 psi as per our well operating guidelines. As the well’s flush liquid rate decreases and as we have real‐time data to optimize, we’ll likely bring the gas lift rate and IA pressure down accordingly. I’m currently in the field and I’ll review this will all of our operations team tonight and tomorrow. 2 Thank you, David Haakinson Operations Engineer | North Slope Asset Team Hilcorp Alaska, LLC Office: (907) 777-8343 | Cell: (307) 660-4999 dhaakinson@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 05/04/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-11A (PTD 221-001) Caliper Survey Report with 3D Viewer 04/25/2021 Please include current contact information if different from above. PTD: 2210010 E-Set: 35085 Received by the AOGCC 05/04/2021 05/04/2021 Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 05/04/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU C-11A (PTD 221-001) Caliper Survey Log 04/25/2021 Please include current contact information if different from above. PTD: 2210010 E-Set: 35084 Received by the AOGCC 05/04/2021 05/04/2021 1 Guhl, Meredith D (CED) From:Sean Mclaughlin <Sean.Mclaughlin@hilcorp.com> Sent:Monday, April 19, 2021 9:01 AM To:Rixse, Melvin G (CED) Cc:Joseph Lastufka; Davies, Stephen F (CED); Boyer, David L (CED) Subject:MPC-11A (221-001) PB1 Mel, MPU C‐11A Update: Unable to run liner across B shale. Sidetrack planned to drill above B shale. Currently running in hole with aluminum billet. Target interval is unchanged. Sidetrack details: OH Sidetrack Date Depth Interval (ft) Length (ft) PB1 4/19/2021 9,750’ – 11,051’ 1301’ Thanks, sean Sean McLaughlin Hilcorp Alaska, LLC Drilling Engineer Sean.McLaughlin@hilcorp.com Cell: 907‐223‐6784 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Convert to Producer 2.Operator Name:4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception?Yes No 9. Property Designation (Lease Number):10. Field/Pool(s): 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): 8,990'N/A Casing Collapse Conductor N/A Surface 2,020psi Production 5,410psi Production 11,200psi Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12.Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date:GAS WAG GSTOR SPLUG Commission Representative: GINJ Op Shutdown Abandoned Chad Helgeson Contact Name: Operations Manager Contact Email:dhaakinson@hilcorp.com Contact Phone: 777-8343 Date: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Post Initial Injection MIT Req'd? Yes No Spacing Exception Required? Yes No Subsequent Form Required: APPROVED BY Approved by:COMMISSIONER THE COMMISSION Date: Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Tubing MD (ft): COMMISSION USE ONLY Authorized Name: Tubing Size:Tubing Grade:Perforation Depth MD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0047433 & ADL0047434 221-001 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 Milne Point Unit / Kuparuk River Oil Pool 50-029-21321-01-00 Hilcorp Alaska LLC N/A Length Size 7,527' 8,901' 7,453' 3,132 ±11,016 N/A PRESENT WELL CONDITION SUMMARY 115' 115' 9.2# / L-80 / EUE 8rd TVD Burst 8,661' MD 2-3/8" 5,454' ±2,606' Perforation Depth TVD (ft): 8,931' 3,520psi 11,780psi 4,745' 7,192' 5,506' 7" BOT HB / BOT '2-B' and Camco TRDP TRSSSV 8,351' MD / 7,002' TVD : 8,629' MD / 7230' TVD and 546' MD / 546' TVD Authorized Title: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Milne Pt Unit C-11A Authorized Signature: 4/26/2021 3-1/2"See Schematic David Haakinson 7"8,982'7,520'7,240psi C.O. 432D See Schematic 80' 13-3/8" 9-5/8" ory Statu Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. 321-199 Chad Helgeson (1517) 2021.04.16 14:48:39 - 08'00' Convert to Producer DLB 04/16/2021 DSR-4/16/21MGR15APR21 SFD 4/19/2021 X 10-404 Comm 4/23/21 dts 4/22/2021 RBDMS HEW 4/23/2021 Conversion to PROD Install POGLM Well: MPU C-11A Well Name:MPU C-11A API Number: 50-029-21321-01-00 Current Status:Shut In - Injector Pad:C-Pad Estimated Start Date:April 26th, 2021 Wellwork unit:SL/EL Reg. Approval Req’d?Yes Date Reg. Approval Rec’vd: Regulatory Contact:Tom Fouts Permit to Drill Number:221-001 First Call Engineer:David Haakinson (907) 777-8343 (O)(307) 660-4999 (M) Second Call Engineer:David Gorm (907) 777-8333 (O)(505) 215-2819 AFE Number:Job Type:Conv to Production Current Bottom Hole Pressure: 3,640 psi @ 7,053’ TVD SBHP (12/27/2020) |9.92 PPG Maximum Expected BHP:3,640 psi @ 7,053’ TVD Decreasing Pressure |9.92 PPG MPSP:2,935 psi Gas Column Gradient (0.1 psi/ft) Max Inclination 42.5° @ 4,600’ MD MIN ID:2.812” SCSSV @ 546’ MD Brief Well Summary MPU C-11A was recently drilled with coiled tubing resulting in a new lateral in the C-sand. The results from the drilling beat expectations and proved enough reserves in the area that will require additional drilling for full development of the oil. The premise of this work is to convert C-11A to gas lift production and add a new drill injector in the future to support both C-04A and C-11A. A pack-off gas lift mandrel is the best option for the well given the lack of mandrels or sliding sleeves. Notes Regarding Wellbore Condition x C-11 was initially completed as an injector in December 1985. x MIT-IA to 2,602 psi completed on 12/26/2020. x In April 2021, a CTD sidetrack lateral was completed as a C-sand only well. x Baker HB packer is rated to 6,000 psi differential pressure o PBR Sheared. Additional casing pressure will not risk packer. GL depth is planned for 1200 psi operating pressure. x Integrity of 2.812” Nipple @ 8,389’ is good for future Combo MIT-IA testing. Objective x Punch tubing holes @ ~8,100’ MD x Set pack-off gas lift mandrel (POGLM) across tubing holes Procedure E-Line 1. MIRU EL. PT lubricator to 200 psig low, 3,500 psig high. 2. MU GR/CCL and 24-arm caliper tool-string. 3. RIH to 8,350’ MD. Perform caliper survey from 8,350’ MD to 7,500’ MD a. POOH @ 40 FPM. In April 2021, a CTD sidetrack lateral was completed as a C-sand only well. MPU C-11A was recently drilled with coiled tubing resulting in a new lateral in the C-sand. T The premise of this work is to convert C-11A to gas lift production a Conversion to PROD Install POGLM Well: MPU C-11A b. Engineer to review data for tubing condition and evaluation of sealing capacity for POGLM elements 4. PU string shot and plan to shoot holes @ ~8,100’ MD a. Up to 3’ of holes will be shot to reduce erosional velocity concerns versus a single hole punch. i. Design gas lift rate is 1,000 mscf/d. b. Correlate to Tubing Caliper Run. c. Target mid joint. Do not shoot on collars. 5. PU Lower Packer Patch and Set @ ~8,115’ MD a. Lower Packer Mid-element should be ~12’ below bottom tubing holes. b. Goal is to set tubing holes across from blast joint. Note: POGLM patch pup joints may change length. 6. RDMO E-line. Slickline 1. MIRU SL. PT lubricator to 200 psig low, 3500 psig high. 2. PU upper POGLM assembly. a. Snap Latch, GLM, Blast Joint, and Upper Packer b. Ensure that GLM is loaded with 1” BK Latch GLV (0.25” OV) 3. RIH and latch upper section with lower receptacle of first section. 4. Set Upper Packer. 5. RDMO Slickline. _____________________________________________________________________________________ Revised By: TDF 4/16/2021 SCHEMATIC Milne Point Unit Well: MP C-11 Last Completed: 12/9/1990 PTD: 185-059 TD =8,990’ (MD) / TD =7,527’(TVD) Initial KB Elev.: 52’(Alaska United #3) Ground level: 17’ 7” 6 15 9-5/8” 1 4 4 MIN ID = 2.750” @ 8,652’ Lower ECP @8,698’ PBTD =8,901’(MD) / PBTD =7,453’(TVD) 10 13-3/8” 2 3 5 7 Estimated Top of Cement @ 7,850’ 8 11 9 Upper ECP @ 8,676’ CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,982’ 0.0383 TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / EUE 8rd 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 58,423’ST 2:Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 68,463’ST 1:TVD= 7,094’, Empty pocket 03/21/2021 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 8,628’ Baker C.L. Seal Assembly with locator, ID = 3.00” 9 8,629’ Baker ‘2-B’ Permanent Packer with Millout Extension 10 8,652’ Camco ‘D’ Nipple,ID = 2.750” 11 8,661’ Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Shot Date Status Size KUP C 8,506’ 8,526’ 7,129’ 7,146’ 20 4/25/1985 Open 5” KUP B 8,600’ 8,604’ 7,206’ 7,209’ 4 4/25/1985 Open 5 KUP A 8,700’ 8,720’ 7,287’ 7,304’ 20 4/25/1985 Open 2-5/8” KUP A 8,734’ 8,762’ 7,315’ 7,338’ 28 4/25/1985 Open 5” Ref Log: DIL Log 4/22/1985 OPEN HOLE / CEMENT DETAIL 9-5/8” 1875 sks Permafrost E plus 220 sks Class G in 12-1/4” hole 9-5/8" x 7” 30 bbls Permafrost C in Annulus 7” 265 sks Class G in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1250’ Max Hole Angle = 42.5° @ 4,600’ Hole Angle thru perforations= 36° TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-00-00 Drilled and Completed by Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 LTSI – SI on 3/10/1995 _____________________________________________________________________________________ Revised By: TDF In Progress PROPOSED Milne Point Unit Well: MP C-11A Last Completed: TBD PTD: 221-001 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface ±8,540’0.0383 2-3/8” Liner 4.6# / L-80 / Hyd625 1.995” ±8,410’ ±11,016’ 0.0039 TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8rd EUE 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 ±8,100 POGLM 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 58,423’ST 2:Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 68,463’ST 1: TVD= 7,094’, Empty pocket 03/21/2021 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 8,628’ Baker C.L. Seal Assembly with locator, ID = 3.00” 9 8,629’ Baker ‘2-B’ Permanent Packer with Millout Extension 10 8,652’ Camco ‘D’ Nipple,ID = 2.750” 11 8,661’ Tubing Tail OPEN HOLE / CEMENT DETAIL 9-5/8” 1875 sks Permafrost E plus 220 sks Class G in 12-1/4” hole 9-5/8" x 7” 30 bbls Permafrost C in Annulus 7” 265 sks Class G in 8-1/2” Hole TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 Redrill by CDR-2: In Progress TD =±11,016’ (MD) / TD =±7,192’(TVD) Initial KB Elev.: 52’ (Alaska United #3) Ground level: 17’ 7” Top of Cement @ ~8423’ 6 2-3/8” 15 9-5/8 ” 1 4 4 Solid to Slotted Liner TBD PBTD =±11,016’(MD) / PBTD =±7,192’(TVD) Top of Liner @ ±8410’ 13- 2 3 5 7 Estimated Top of Cement @ 7,850’ NSAK 2 Trip 3-½” Gas Lift Mandrel Straddle Packer Two Trip Install With In-Sit-U GLM The enclosed is conceptual for information only. All feasibility and dimensional data should be verified with the supplying vendor prior to installation. Local Knowledge for a Global Industry Well No.:MPU C-11 Vendor: Drawn By: CWD Requested By:NSAK Date: 4/8/2021FOR INFORMATION ONLY NSAK Ref: 15465-000xx Description OD ID Length Total Length TW: David Haakinson NSAK 350-272 Upper Packer 3" GS FN x 2-3/8" 4.6# ST-L Pin or 511 NSAK In Sit U Gas Lift Mandrel 2-3/8" STL Box X Pin Accepts 1" BK Style or Bottom Latch Snap Latch Mandrel 2-3/8" ST-L Box x 2.25" Seal Unit NSAK 350-272 Lower Packer 2-3/8" ST-L Box Up x WLEG Down Mechanical Set on W-Line Snap Latch Receptacle w/ 2.25" Seal Bore Receptacle 3" GS Box Up x 2-3/8" ST-L Pin Down Run #1 Run #2 8100'Blast Joint 2-3/8" ST-L B x P Pup Joint 2-3/8" STL B x P Perfs 2.72" 1.81" 4.70'2.72" 1.81" 4.70' 2.625" 1.995" 9.90'2.625" 1.995" 9.90' 2.700" 1.00" 2.16'2.700" 1.00" 2.16' 2.700" 1.800" 1.50'2.700" 1.800" 1.50' 2.700" 2.25" 4.82'2.700" 2.25" 4.82' 2.375" 1.995" 2' +-2.375" 1.995" 2' +- 2.72" 1.83"4.82'2.72" 1.83"4.82' The enclosed is conceptual for information only. All feasibility and dimensional data should be verified with the supplying vendor prior to installation. Local Knowledge for a Global Industry Well No.:Vendor: Drawn By: CWD Requested By:NSAK Date: 04-08-2021FOR INFORMATION ONLY NSAK Ref: 15465-000xx Description OD ID Length Total Length TW: David Haakinson 3-½” 35 KB Bottom Packer E Line Set MPU C-11 NSAK 350-272 Lower Packer 2-3/8" ST-L or 511 Box Up x WLEG Down Mechanical Set on W-Line Snap Latch Receptacle w/ 2.25" Seal Bore Receptacle 3" GS Box Up x 2-3/8" ST-L Pin Down Or Hydril 511 Pup Joint 2-3/8" STL B x P Or Hydril 511 2.700" 2.25" 4.82'2.700" 2.25" 4.82' 2.375" 1.995" 2' +-2.375" 1.995" 2' +- 2.72" 1.83"4.82'2.72" 1.83"4.82' The enclosed is conceptual for information only. All feasibility and dimensional data should be verified with the supplying vendor prior to installation. Local Knowledge for a Global Industry Well No.:Vendor: Requested By:FOR INFORMATION ONLY NSAK Ref: 15465-000xx Description OD ID Length Total Length TW: 3-½” Gas Lift Straddle Two Trip Install Run # 2 – Slick Line MPU C-11 Drawn By: CWD NSAK Date: 04/08/21David Haakinson NSAK 350-272 Upper Packer 3" GS FN x 2-3/8" 4.6# ST-L Pin or 511 NSAK In Sit U Gas Lift Mandrel 2-3/8" STL or 511 Box X Pin Accepts 1" BK Style or Bottom Latch Snap Latch Mandrel 2-3/8" ST-L or 511 Box x 2.25" Seal Unit Blast Joint 2-3/8" ST-L B x P or 511 2.72" 1.81" 4.70'2.72" 1.81" 4.70' 2.625" 1.995" 9.90'2.625" 1.995" 9.90' 2.700" 1.00" 2.16'2.700" 1.00" 2.16' 2.700" 1.810" 1.50'2.700" 1.810" 1.50' 8100'Perfs Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Monty M Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk Oil Pool, MPU C-11A Hilcorp Alaska, LLC Permit to Drill Number: 221-001 Surface Location: 1069' FSL, 2204' FEL, Sec. 10, T13N, R10E, UM, AK Bottomhole Location: 77' FSL, 2358' FWL, Sec. 02, T13N, R10E, UM, AK Dear Mr. Myers: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of January, 2021. y, i 13 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp 1c. Specify if well is proposed for: Drill Lateral Stratigraphic Test Development - Oil Service - Winj Single Zone Coalbed Gas Gas Hydrates Redrill Reentry Exploratory - Oil Development - Gas Service - Supply Multiple Zone Geothermal Shale Gas 2. Operator Name: 5. Bond: Blanket Single Well 11. Well Name and Number: Bond No. 3. Address: 6. Proposed Depth: 12. Field/Pool(s): MD: 11016' TVD: 7192' 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 52' 15. Distance to Nearest Well Open Surface: x-558256 y- 6029352 Zone-4 17' to Same Pool: 3265' 16. Deviated wells: Kickoff depth: 8540 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: Surface: Hole Casing Weight Grade Coupling Length MD TVD MD TVD 3-1/4" 2-3/8" 4.4# L-80 TH511 2606' 8400' 7042' 11016' 7192' 19.PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Junk (measured): None TVD 115' 4745' 7520' 8506' - 8762' 7129' - 7338' Hydraulic Fracture planned? Yes No 20. Attachments: Property Plat BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements Contact Name: Contact Email: Contact Phone: Date: Permit to Drill API Number: Permit Approval Number:Date: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Samples req'd: Yes No Mud log req'd: Yes No H2S measures: Yes No Directional svy req'd: Yes No Spacing exception req'd: Yes No Inclination-only svy req'd: Yes No Post initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Sr Pet Eng Sr Pet Geo Sr Res Eng GL / BF Elevation above MSL (ft): See cover letter for other requirements. Perforation Depth MD (ft): 21. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Commission Use Only Perforation Depth TVD (ft): 1875 sx PF 'E', 220 sx Class 'G' 115' 5506' 8982' SizeLength Authorized Signature: 265 sx Class 'G'Production Liner Intermediate 8982'7" 9-5/8"Surface Conductor/Structural 13-3/8"80' 5506' (including stage data) Effect. Depth TVD (ft): 8901'8990'7527' Total Depth MD (ft): Total Depth TVD (ft): 7453' Uncemented Solid / Slotted Liner Casing None 2016' FNL, 1242' FWL, Sec. 11, T13N, R10E, UM, AK 77' FSL, 2358' FWL, Sec. 02, T13N, R10E, UM, AK 84-123 5120 Cement Volume MD Effect. Depth MD (ft):Plugs (measured): 4933' Cement Quantity, c.f. or sacks 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 Hilcorp Alaska, LLC 1069' FSL, 2204' FEL, Sec. 10, T13N, R10E, UM, AK ADL 047434 & 047433 022224484 3695 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 4420 MPU C-11A Milne Point Unit Kuparuk Oil Pool 50-029-21321-01-00 3/1/2020 Authorized Name: Monty Myers Authorized Title: Drilling Manager Sean McLaughlin sean.mclaughlin@hilcorp.com 907-223-6784 18. Casing Program: Top - Setting Depth - BottomSpecifications Form 10-401 Revised 3/2020 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g) 1.7.2021 By Samantha Carlisle at 10:42 am, Jan 07, 2021 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2021.01.07 10:06:34 -09'00' Monty M Myers X 221-001 X X X DLB 01/08/2020 DSR-1/7/21 X X X DLB MGR11JAN2021 2021 BOPE test to 4000 psi. Annular to 3500 psi. Alternate plug placement approved per 20 AAC 25.112(i) R11JAN2021 1/13/2021 1/13/2021 Redacted 06/28/2021 M. Guhl Area of Review MPU C-11APTD API WELL STATUSTop of KupC (MD)Top of KupC (TVD)CBL Top ofCement(MD)CBL Top ofCement(TVD) Kuparuk C statusZonal Isolation195-191 50-029-21321-00-00 MPU C-11Kuparuk A, B & CWINJ 8505' 7128' 7850' 6595' Cased/CementedHilcorp will P&A this well forcompleting MPU C-11A217-077 50-023-23577-70-00 MPU C-47PB1 Kuparuk Plugback 10217' 7152' 6448' 4789'OpenCement Plug / Retainers inSurface Casing217-077 50-029-23577-71-00 MPU C-47PB2 Kuparuk Plugback 10249' 7150' 6448' 4789'OpenCement Plug / Retainers inSurface Casing To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin Drilling Engineer Date: January 7, 2021 Re: MPU C-11A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well MPU C-11 with the Nabors CDR2 Coiled Tubing Drilling rig on or around March 2021. Proposed plan for MPU C-11A Injector: Prior to drilling activities the wellbore will be prepared for a sidetrack (see C-11 Sundry request). A tubing plug and cement retainer will be used to fill the annulus with cement between the straddle packers. This operation will isolate the parent perforations. An E-line unit will set a CTD whipstock. CDR2 will mill a 2.80” window through the 3-1/2” tubing and 7” casing. An in zone 2,467’ “C” sand injector will be drilled into the fault block to the north to a TD of 11,016’. The lateral will be completed with a 2-3/8” solid liner 300’ past the fault to the north and then 2-3/8” slotted liner to TD. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: 1. Reference MPU C-11 Sundry dated 12/31/2020 and submitted by Ian Toomey 2. Additional pre-rig work: a. E-line: Set 3.5” monobore whipstock at 8540’, 15 deg ROHS Rig Work: 3. MIRU and test BOPE to 4000 psi. MASP with gas (0.10 psi/ft) to surface is 3695 psi a. Test annular to 3500 psi. b. Test against swab and master valves (No TWC) c. Load pits with 9.3 ppg mud d. Open well and ensure zero pressure 4. Mill 2.80” dual string window plus 10’ of rathole. a. TOWS at 8540’, 15 ROHS. b. Two runs planned. First with a 0.6 deg motor and the second with a 1.25 deg motor c. Pressure deployment is required for the window milling runs i. SBHPS 12/27/20 3,844 psi at 7,129’ TVD (10.4 ppg EMW) 5. Drill C sand sidetrack a. 2.375” BHA with GR/RES b. Drill with bicenter bit (3.25”) c. 35 deg build section – 446’ d. 12 deg lateral section - 2030’ e. Planned fault crossing at 10,137’. i. Transition from a 10.4 ppg to an 11.7 ppg reservoir. f. Planned TD 11,016’ g. Target constant bottom hole pressure of 11.8 ppg for entire sidetrack h. Pressure deployment will be required i. After TD and on the last trip out of hole lay in KWF in preparation for liner run j. No flow test prior to laying down drilling BHA 24 hour notice to AOGCC to witness. 6. Run 2-3/8” L-80 solid/slotted liner a. Have 2-3/8” safety joint with TIW valve ready to be picked up while running slotted liner b. Solid liner to 300’ past fault and then slotted to TD i. Liner may be run in two sections if weight transfer or hole conditions is poor c. After releasing from the liner swap the well over to 2% KCl i. Expect 1220 psi WHP d. Freeze protect well from 2000’ Post Rig: 1. V: Tree work as necessary 2. S: Install LTP 3. F: MIT-IA to 2,600 psi Managed Pressure Drilling: MPD will be utilized to provide overbalance and constant bottom hole pressure while drilling by using 9.3 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure allow for lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and the mud pits and will be independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 2.375” pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected for MPC-11A: MPD Pressure at the MPU C-11A Planned Window (8540’ MD - 7105’ TVD) Pumps On Pumps Off A Target BHP at Window (ppg) 4360 psi 4360 psi 11.8 B Annular friction - ECD (psi/ft) 769 psi 0 psi 0.09 C Mud Hydrostatic (ppg) 3436 psi 3436 psi 9.3 B+C Mud + ECD Combined 4205 psi 3436 psi (no choke pressure) A-(B+C) Choke Pressure Required to Maintain 155 psi 924 psi Target BHP at window and deeper Operation Details: Reservoir Pressure: x The maximum reservoir pressure is expected to be 4,420 psi at 7266’ TVDSS (11.7 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 3695 psi. Mud Program: x Drilling: Minimum MW of 9.3 ppg KCL with Geovis for drilling. Managed pressure used to maintain hydrostatic overbalance. CTU Managed Pressure Drilling protocols will be employed. DLB x KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (11.9 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. x Completion: 11.9ppg NaBr KWF to be used for liner deployment Disposal: x All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility. Hole Size: x 3.25” bicenter hole for entirety of the sidetrack. Liner Program: x 2-3/8”, 4.4#, L-80 solid liner: 8,400’ MD – 10,437’ MD (XO 300’ past fault) x 2-3/8”, 4.4#, L-80 slotted liner: 10,437’ MD – 11,016’ MD x No Cement. A liner top packer will be run post rig to facilitate injection into the new fault block. x The primary barrier for this operation: A minimum EMW of 11.9 ppg brine (75 psi over balance) x An X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: x 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. x BOP diagram is attached. MPD and pressure deployment is planned. x Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,000 psi. x The annular preventer will be tested to 250 psi and 3,500 psi. Directional: x Directional plan attached. Maximum planned hole angle is 101°, inclination at kick off point is 35°. x Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. x Distance to nearest property line – 4,933’ x Distance to nearest well within pool – 3,265’ (C-04) Logging: x MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. x Real time bore pressure to aid in MPD and ECD management. Perforating: x No perforating, slotted liner. Anti-Collision Failures: x C-47PB1 – 27’ ellipse separation. C-47PB1 is isolated and no additional safety measures required Hazards: x No H2S at MPU. x Fault crossing planned at 10,137’ into the A sand. Potential to go from an 10.4ppg EMW to 11.7ppg EWM. The pressure observed in the offset fault block is based on data from drilling the A sand in MPC- 47. The pressure may have dissipated in the last two years but is not able to be determined. There has been no recent injection in the area so pressure is not expected to be elevated above what was observed during the MPC-47 drilling. x Medium lost circulation risk. Sean McLaughlin CC: Well File CTD Engineer Joseph Lastufka 907-223-6784 07 December, 2020 Plan: MPU C-11A wp03 Milne Point M Pt C Pad MPC-11 Plan: MPU C-11A 550060006500700075008000True Vertical Depth (750 usft/in)4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 10000 10500 11000Vertical Section at 46.72° (750 usft/in)MPC-11L1 wp03 tgt01MPC-11L1 wp03 tgt02MPC-11L1 wp03 tgt03MPC-11L1 wp03 tgt04MPC-11L1 wp03 tgt05MPC-11L1 wp03 tgt06MPC-11L1 wp03 tgt07MPC-11L1 wp03 tgt08MPC-11L1 wp03 tgt09MPC-11L1 wp03 tgt10MPC-11L1 wp03 tgt11MPC-11L1 wp03 tgt12MPC-11L1 wp03 tgt1385008990MPC-112 3/8" x 3 1/4"9 0 0 0950010000105001100011016MPU C-11A wp03KOP:StartDir9º/100':8540'MD,0'TVD:15°RTTFStartDir35º/100':8560'MD,20'TVDStartDir12º/100':8746.62'MD,186.62'TVDTotalDepth:11016'MD,289.38'TVDWELL DETAILS: MPC-11 NAD 1927 (NADCON CONUS) Alaska Zone 04Ground Level:0.00+N/-S+E/-W Northing EastingLatittude Longitude0.00 0.00 6029351.580 558255.76170° 29' 26.894 N149° 31' 25.542 WCASING DETAILSTVD TVDSS MD Size Name7191.90 7139.90 11016.00 2-3/8 2 3/8" x 3 1/4"FORMATION TOP DETAILSNo formation data is availableProject: Milne PointSite: M Pt C PadWell: MPC-11Wellbore: Plan: MPU C-11ADesign: MPU C-11A wp03SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 8540.00 35.20 57.00 7157.12 2208.01 3462.42 0.00 0.00 4034.46 KOP : Start Dir 9º/100' : 8540' MD, 0'TVD : 15° RT TF2 8560.00 36.94 57.78 7173.29 2214.36 3472.34 9.00 15.00 4046.03 Start Dir 35º/100' : 8560' MD, 20'TVD3 8746.62 98.00 30.47 7242.55 2337.55 3578.37 35.00 -30.00 4207.68 Start Dir 12º/100' : 8746.62' MD, 186.62'TVD4 8986.62 101.82 1.47 7200.38 2562.14 3643.01 12.00 -80.00 4408.705 9161.62 84.48 13.39 7190.77 2734.42 3665.64 12.00 145.00 4543.276 9261.62 84.60 25.44 7200.31 2828.12 3698.67 12.00 90.00 4631.567 9536.62 85.48 58.56 7224.76 3028.81 3879.46 12.00 90.00 4900.768 9961.62 86.38 7.43 7257.11 3372.60 4102.55 12.00 -91.00 5298.86910136.62 87.69 28.42 7266.26 3537.94 4156.05 12.00 87.00 5451.161010236.62 91.82 39.69 7266.69 3620.64 4211.95 12.00 70.00 5548.5511 10416.62 110.37 28.37 7232.09 3765.82 4310.66 12.00 -30.00 5719.941210516.62 110.53 15.56 7197.02 3852.49 4345.61 12.00 -87.00 5804.801310726.62 85.33 15.56 7168.28 4051.25 4400.95 12.00 -180.00 5981.341411016.00 85.59 50.39 7191.90 4289.48 4555.54 12.00 91.00 6257.20 Total Depth : 11016' MD, 289.38' TVDSURVEY PROGRAMDate: 2020-12-07T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool100.00 8540.00 1 : Camera based gyro multisho (MPC-11) 3_CB-Film-GMS8540.00 8940.00 MPU C-11A wp03 (Plan: MPU C-11A) 3_MWD_Interp Azi+Sag8940.00 11016.00 MPU C-11A wp03 (Plan: MPU C-11A) 3_MWD+IFR2+MS+Sag 1400 1750 2100 2450 2800 3150 3500 3850 4200 4550 4900 5250 5600 5950 6300 6650 7000 7350 7700 8050 South(-)/North(+) (700 usft/in)3150 3500 3850 4200 4550 4900 5250 5600 5950 6300 6650 7000 7350 7700 8050 West(-)/East(+) (700 usft/in) MPC-11L1 wp03 tgt13 MPC-11L1 wp03 tgt12 MPC-11L1 wp03 tgt11 MPC-11L1 wp03 tgt10 MPC-11L1 wp03 tgt09 MPC-11L1 wp03 tgt08 MPC-11L1 wp03 tgt07 MPC-11L1 wp03 tgt06 MPC-11L1 wp03 tgt05 MPC-11L1 wp03 tgt04 MPC-11L1 wp03 tgt03 MPC-11L1 wp03 tgt02 MPC-11L1 wp03 tgt01 MPC-11 7" 2 3/8" x 3 1/4" 6 5 0 0 6 7 5 0 7 0 0 0 7250 7 1 9 2 MPU C-11A wp03 KOP : Start Dir 9º/100' : 8540' MD, 0'TVD : 15° RT TF Start Dir 35º/100' : 8560' MD, 20'TVD Start Dir 12º/100' : 8746.62' MD, 186.62'TVD Total Depth : 11016' MD, 289.38' TVD CASING DETAILS TVD TVDSS MD Size Name 7191.90 7139.90 11016.00 2-3/8 2 3/8" x 3 1/4" Project: Milne Point Site: M Pt C Pad Well: MPC-11 Wellbore: Plan: MPU C-11A Plan: MPU C-11A wp03 WELL DETAILS: MPC-11 Ground Level: 0.00 +N/-S +E/-W Northing Easting Latittude Longitude0.00 0.00 6029351.580 558255.761 70° 29' 26.894 N 149° 31' 25.542 W REFERENCE INFORMATION Co-ordinate (N/E) Reference:Well MPC-11, True North Vertical (TVD) Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic drilling rig) Measured Depth Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic drilling rig) Calculation Method:Minimum Curvature Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Milne Point, ACT, MILNE POINT Alaska Zone 04 Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Position: From: Site Latitude: Longitude: Position Uncertainty: Northing: Easting: Grid Convergence: M Pt C Pad, TR-13-10 usft Map usft usft °0.45Slot Radius:"0 6,027,347.710 558,058.040 0.00 70° 29' 7.200 N 149° 31' 31.821 W Well Well Position Longitude: Latitude: Easting: Northing: usft +E/-W +N/-S Position Uncertainty usft usft usftGround Level: MPC-11, MPC-11 usft usft 0.00 0.00 6,029,351.580 558,255.761 0.00Wellhead Elevation:usft0.00 70° 29' 26.894 N 149° 31' 25.542 W Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) Plan: MPU C-11A Model NameMagnetics BGGM2020 2/21/2021 15.73 80.87 57,359.54164259 Phase:Version: Audit Notes: Design MPU C-11A wp03 PLAN Vertical Section: Depth From (TVD) (usft) +N/-S (usft) Direction (°) +E/-W (usft) Tie On Depth:8,540.00 46.720.000.0035.60 Inclination (°) Azimuth (°) +E/-W (usft) Tool Face (°) +N/-S (usft) Measured Depth (usft) Vertical Depth (usft) Dogleg Rate (°/100usft) Build Rate (°/100usft) Turn Rate (°/100usft) Plan Sections TVD System usft 0.000.000.000.003,462.422,208.017,157.1257.0035.208,540.00 7,105.12 15.003.888.719.003,472.342,214.367,173.2957.7836.948,560.00 7,121.29 -30.00-14.6332.7235.003,578.372,337.557,242.5530.4798.008,746.62 7,190.55 -80.00-12.081.5912.003,643.012,562.147,200.381.47101.828,986.62 7,148.38 145.006.81-9.9112.003,665.642,734.427,190.7713.3984.489,161.62 7,138.77 90.0012.050.1212.003,698.672,828.127,200.3125.4484.609,261.62 7,148.31 90.0012.040.3212.003,879.463,028.817,224.7658.5685.489,536.62 7,172.76 -91.00-12.030.2112.004,102.553,372.607,257.117.4386.389,961.62 7,205.11 87.0011.990.7512.004,156.053,537.947,266.2628.4287.6910,136.62 7,214.26 70.0011.274.1212.004,211.953,620.647,266.6939.6991.8210,236.62 7,214.69 -30.00-6.2910.3112.004,310.663,765.827,232.0928.37110.3710,416.62 7,180.09 -87.00-12.810.1612.004,345.613,852.497,197.0215.56110.5310,516.62 7,145.02 -180.000.00-12.0012.004,400.954,051.257,168.2815.5685.3310,726.62 7,116.28 91.0012.040.0912.004,555.544,289.487,191.9050.3985.5911,016.00 7,139.90 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 2 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS -16.40 Vert Section 35.60 0.00 35.60 0.00 0.000.00 558,255.7616,029,351.580-16.40 0.000 0.00 100.00 0.00 100.00 0.00 0.000.00 558,255.7616,029,351.58048.00 0.000 0.00 115.00 0.00 115.00 0.00 0.000.00 558,255.7616,029,351.58063.00 0.000 0.00 13 3/8" 200.00 0.00 200.00 0.00 0.000.00 558,255.7616,029,351.580148.00 0.000 0.00 300.00 0.00 300.00 0.00 0.000.00 558,255.7616,029,351.580248.00 0.000 0.00 400.00 0.00 400.00 0.00 0.000.00 558,255.7616,029,351.580348.00 0.000 0.00 500.00 0.00 500.00 0.00 0.000.00 558,255.7616,029,351.580448.00 0.000 0.00 600.00 0.25 600.00 0.19 -0.10332.00 558,255.6576,029,351.772548.00 0.250 0.06 700.00 0.00 700.00 0.39 -0.20180.00 558,255.5536,029,351.964648.00 0.250 0.11 800.00 0.00 800.00 0.39 -0.20180.00 558,255.5536,029,351.964748.00 0.000 0.11 900.00 0.25 900.00 0.29 -0.40244.00 558,255.3586,029,351.866848.00 0.250 -0.09 1,000.00 0.00 1,000.00 0.19 -0.60180.00 558,255.1636,029,351.769948.00 0.250 -0.30 1,100.00 0.00 1,100.00 0.19 -0.60180.00 558,255.1636,029,351.7691,048.00 0.000 -0.30 1,200.00 0.25 1,200.00 0.07 -0.42124.00 558,255.3446,029,351.6491,148.00 0.250 -0.25 1,300.00 1.50 1,299.98 -0.30 1.05101.00 558,256.8136,029,351.2881,247.98 1.274 0.56 1,400.00 3.75 1,399.88 0.24 5.5176.00 558,261.2666,029,351.8651,347.88 2.473 4.18 1,500.00 7.00 1,499.42 2.82 14.5173.00 558,270.2486,029,354.5081,447.42 3.261 12.49 1,600.00 10.50 1,598.25 7.86 28.8569.00 558,284.5456,029,359.6691,546.25 3.550 26.39 1,700.00 12.50 1,696.23 15.70 47.1765.00 558,302.7986,029,367.6511,644.23 2.152 45.10 1,800.00 15.50 1,793.26 27.16 68.4359.00 558,323.9736,029,379.2751,741.26 3.329 68.44 1,900.00 17.75 1,889.07 42.35 92.6757.00 558,348.0926,029,394.6491,837.07 2.321 96.50 2,000.00 19.50 1,983.83 59.50 119.6158.00 558,374.8946,029,412.0061,931.83 1.779 127.87 2,100.00 23.00 2,077.02 79.27 149.9856.00 558,405.0966,029,432.0172,025.02 3.574 163.53 2,200.00 25.50 2,168.19 102.55 183.8155.00 558,438.7446,029,455.5542,116.19 2.533 204.12 2,300.00 28.50 2,257.28 128.92 220.7554.00 558,475.4766,029,482.2162,205.28 3.034 249.10 2,400.00 30.75 2,344.20 158.69 260.2152.00 558,514.6906,029,512.2882,292.20 2.457 298.23 2,500.00 32.50 2,429.35 190.97 301.5252.00 558,555.7506,029,544.8892,377.35 1.750 350.44 2,600.00 35.25 2,512.37 225.28 345.4452.00 558,599.3946,029,579.5422,460.37 2.750 405.94 2,700.00 37.50 2,592.88 261.37 392.5053.00 558,646.1616,029,615.9952,540.88 2.327 464.93 2,800.00 38.25 2,671.81 298.75 441.2052.00 558,694.5646,029,653.7482,619.81 0.969 526.02 2,900.00 36.50 2,751.28 335.71 489.3553.00 558,742.4186,029,691.0802,699.28 1.852 586.41 3,000.00 37.00 2,831.41 371.72 537.1353.00 558,789.9146,029,727.4582,779.41 0.500 645.88 3,100.00 37.00 2,911.27 407.94 585.2053.00 558,837.6876,029,764.0482,859.27 0.000 705.70 3,200.00 37.50 2,990.87 443.94 633.8554.00 558,886.0566,029,800.4262,938.87 0.785 765.81 3,300.00 37.50 3,070.21 479.29 683.4155.00 558,935.3326,029,836.1593,018.21 0.609 826.12 3,400.00 39.00 3,148.74 514.34 734.4456.00 558,986.0746,029,871.6113,096.74 1.623 887.30 3,500.00 39.75 3,226.04 549.82 787.0356.00 559,038.3836,029,907.4933,174.04 0.750 949.91 3,600.00 40.00 3,302.78 585.20 840.4957.00 559,091.5606,029,943.2913,250.78 0.688 1,013.09 3,700.00 40.00 3,379.39 619.74 894.7058.00 559,145.4936,029,978.2473,327.39 0.643 1,076.23 3,800.00 39.75 3,456.13 653.71 949.0758.00 559,199.5896,030,012.6423,404.13 0.250 1,139.10 3,900.00 40.75 3,532.45 687.95 1,003.8658.00 559,254.1086,030,047.3063,480.45 1.000 1,202.47 4,000.00 41.00 3,608.07 722.14 1,059.6659.00 559,309.6306,030,081.9303,556.07 0.701 1,266.53 4,100.00 41.25 3,683.40 756.99 1,115.4357.00 559,365.1196,030,117.2143,631.40 1.339 1,331.02 4,200.00 41.50 3,758.44 792.99 1,170.8657.00 559,420.2646,030,153.6433,706.44 0.250 1,396.06 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 3 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 3,781.48 Vert Section 4,300.00 41.25 3,833.48 828.51 1,226.6158.00 559,475.7246,030,189.5903,781.48 0.707 1,460.99 4,400.00 42.00 3,908.23 863.71 1,282.9458.00 559,531.7726,030,225.2273,856.23 0.750 1,526.13 4,500.00 42.00 3,982.54 899.16 1,339.6958.00 559,588.2336,030,261.1263,930.54 0.000 1,591.76 4,600.00 42.50 4,056.57 933.79 1,397.3260.00 559,645.5846,030,296.1944,004.57 1.435 1,657.45 4,700.00 41.00 4,131.17 967.57 1,454.6959.00 559,702.6876,030,330.4264,079.17 1.641 1,722.38 4,800.00 40.50 4,206.93 1,001.19 1,510.6459.00 559,758.3696,030,364.4794,154.93 0.500 1,786.16 4,900.00 40.75 4,282.83 1,035.21 1,566.1658.00 559,813.6096,030,398.9304,230.83 0.697 1,849.90 5,000.00 40.75 4,358.59 1,069.32 1,621.8159.00 559,868.9906,030,433.4684,306.59 0.653 1,913.80 5,100.00 40.50 4,434.49 1,102.36 1,677.9160.00 559,924.8236,030,466.9494,382.49 0.697 1,977.30 5,200.00 40.50 4,510.53 1,135.33 1,733.8759.00 559,980.5156,030,500.3454,458.53 0.649 2,040.63 5,300.00 40.00 4,586.85 1,168.60 1,789.2559.00 560,035.6306,030,534.0524,534.85 0.500 2,103.77 5,400.00 40.00 4,663.46 1,201.71 1,844.3559.00 560,090.4626,030,567.5854,611.46 0.000 2,166.58 5,500.00 39.25 4,740.48 1,234.56 1,899.0259.00 560,144.8646,030,600.8564,688.48 0.750 2,228.89 5,506.00 39.29 4,745.12 1,236.51 1,902.2759.00 560,148.1036,030,602.8384,693.12 0.750 2,232.61 9 5/8" 5,600.00 40.00 4,817.50 1,267.40 1,953.6859.00 560,199.2666,030,634.1274,765.50 0.750 2,291.21 5,700.00 40.50 4,893.82 1,301.16 2,008.7758.00 560,254.0826,030,668.3164,841.82 0.817 2,354.46 5,800.00 40.75 4,969.72 1,335.67 2,063.9958.00 560,309.0226,030,703.2474,917.72 0.250 2,418.32 5,900.00 41.25 5,045.19 1,370.43 2,119.6258.00 560,364.3796,030,738.4444,993.19 0.500 2,482.65 6,000.00 39.75 5,121.23 1,404.85 2,174.7058.00 560,419.1776,030,773.2865,069.23 1.500 2,546.34 6,100.00 38.75 5,198.67 1,438.38 2,228.3558.00 560,472.5636,030,807.2305,146.67 1.000 2,608.39 6,200.00 38.50 5,276.80 1,471.45 2,281.2958.00 560,525.2356,030,840.7195,224.80 0.250 2,669.61 6,300.00 37.25 5,355.73 1,503.99 2,333.3558.00 560,577.0376,030,873.6565,303.73 1.250 2,729.82 6,400.00 37.50 5,435.20 1,536.15 2,384.8358.00 560,628.2586,030,906.2235,383.20 0.250 2,789.35 6,500.00 37.75 5,514.40 1,568.96 2,436.3257.00 560,679.4806,030,939.4245,462.40 0.660 2,849.32 6,600.00 38.25 5,593.20 1,602.49 2,487.9557.00 560,730.8446,030,973.3565,541.20 0.500 2,909.90 6,700.00 38.00 5,671.87 1,636.11 2,539.7357.00 560,782.3526,031,007.3825,619.87 0.250 2,970.64 6,800.00 37.50 5,750.94 1,668.56 2,591.6459.00 560,834.0016,031,040.2285,698.94 1.323 3,030.68 6,900.00 36.50 5,830.81 1,698.20 2,644.0062.00 560,886.1186,031,070.2775,778.81 2.064 3,089.12 7,000.00 36.75 5,911.06 1,726.67 2,696.4261.00 560,938.3146,031,099.1515,859.06 0.647 3,146.80 7,100.00 37.50 5,990.80 1,756.85 2,748.6859.00 560,990.3306,031,129.7385,938.80 1.421 3,205.54 7,200.00 36.25 6,070.79 1,787.75 2,800.1259.00 561,041.5166,031,161.0436,018.79 1.250 3,264.17 7,300.00 36.50 6,151.31 1,818.74 2,850.6858.00 561,091.8326,031,192.4236,099.31 0.644 3,322.23 7,400.00 36.75 6,231.56 1,850.36 2,901.2758.00 561,142.1706,031,224.4296,179.56 0.250 3,380.73 7,500.00 36.50 6,311.82 1,881.97 2,951.8758.00 561,192.5096,031,256.4356,259.82 0.250 3,439.24 7,600.00 36.00 6,392.46 1,913.30 3,002.0158.00 561,242.4036,031,288.1586,340.46 0.500 3,497.23 7,700.00 36.00 6,473.37 1,944.88 3,051.5857.00 561,291.7216,031,320.1246,421.37 0.588 3,554.97 7,800.00 35.75 6,554.40 1,976.37 3,101.0158.00 561,340.8906,031,351.9946,502.40 0.637 3,612.53 7,900.00 35.75 6,635.55 2,007.33 3,150.5558.00 561,390.1886,031,383.3396,583.55 0.000 3,669.83 8,000.00 35.75 6,716.71 2,038.72 3,199.8357.00 561,439.2106,031,415.1116,664.71 0.584 3,727.22 8,100.00 35.75 6,797.87 2,070.11 3,249.1058.00 561,488.2316,031,446.8846,745.87 0.584 3,784.62 8,200.00 35.75 6,879.03 2,101.07 3,298.6558.00 561,537.5306,031,478.2296,827.03 0.000 3,841.91 8,300.00 35.00 6,960.57 2,132.17 3,347.4757.00 561,586.1066,031,509.7086,908.57 0.947 3,898.78 8,400.00 35.00 7,042.48 2,163.83 3,395.3056.00 561,633.6816,031,541.7366,990.48 0.574 3,955.30 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 4 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 7,058.47 Vert Section 8,483.00 35.00 7,110.47 2,190.17 3,434.9656.83 561,673.1286,031,568.3777,058.47 0.574 4,002.23 7" 8,500.00 35.00 7,124.40 2,195.49 3,443.1357.00 561,681.2556,031,573.7637,072.40 0.574 4,011.83 8,540.00 35.20 7,157.12 2,208.01 3,462.4257.00 561,700.4446,031,586.4407,105.12 0.500 4,034.46 KOP : Start Dir 9º/100' : 8540' MD, 0'TVD : 15° RT TF 8,550.00 36.07 7,165.25 2,211.17 3,467.3257.40 561,705.3166,031,589.6347,113.25 9.000 4,040.19 8,560.00 36.94 7,173.29 2,214.36 3,472.3457.78 561,710.3126,031,592.8617,121.29 9.000 4,046.03 Start Dir 35º/100' : 8560' MD, 20'TVD 8,570.00 40.01 7,181.12 2,217.80 3,477.5255.05 561,715.4636,031,596.3467,129.12 35.000 4,052.16 8,580.00 43.12 7,188.60 2,221.72 3,482.8752.66 561,720.7866,031,600.3037,136.60 35.000 4,058.74 8,590.00 46.29 7,195.71 2,226.09 3,488.3850.53 561,726.2606,031,604.7177,143.71 35.000 4,065.75 8,600.00 49.49 7,202.41 2,230.90 3,494.0348.62 561,731.8666,031,609.5737,150.41 35.000 4,073.16 8,610.00 52.72 7,208.69 2,236.14 3,499.7846.88 561,737.5826,031,614.8517,156.69 35.000 4,080.94 8,620.00 55.97 7,214.52 2,241.77 3,505.6345.29 561,743.3886,031,620.5327,162.52 35.000 4,089.06 8,630.00 59.24 7,219.88 2,247.79 3,511.5543.81 561,749.2616,031,626.5957,167.88 35.000 4,097.50 8,640.00 62.53 7,224.74 2,254.17 3,517.5242.43 561,755.1806,031,633.0187,172.74 35.000 4,106.22 8,650.00 65.82 7,229.10 2,260.88 3,523.5241.13 561,761.1226,031,639.7757,177.10 35.000 4,115.18 8,660.00 69.13 7,232.93 2,267.90 3,529.5239.90 561,767.0666,031,646.8447,180.93 35.000 4,124.36 8,670.00 72.45 7,236.22 2,275.21 3,535.5038.72 561,772.9896,031,654.1957,184.22 35.000 4,133.73 8,680.00 75.78 7,238.95 2,282.77 3,541.4437.58 561,778.8696,031,661.8047,186.95 35.000 4,143.24 8,690.00 79.11 7,241.13 2,290.56 3,547.3236.48 561,784.6856,031,669.6407,189.13 35.000 4,152.86 8,700.00 82.44 7,242.73 2,298.55 3,553.1135.40 561,790.4136,031,677.6757,190.73 35.000 4,162.55 8,710.00 85.78 7,243.76 2,306.71 3,558.8034.34 561,796.0346,031,685.8787,191.76 35.000 4,172.28 8,720.00 89.12 7,244.20 2,315.01 3,564.3533.28 561,801.5276,031,694.2207,192.20 35.000 4,182.02 8,730.00 92.45 7,244.06 2,323.42 3,569.7632.23 561,806.8706,031,702.6697,192.06 35.000 4,191.72 8,740.00 95.79 7,243.35 2,331.90 3,575.0031.17 561,812.0436,031,711.1947,191.35 35.000 4,201.35 8,746.62 98.00 7,242.55 2,337.55 3,578.3730.47 561,815.3666,031,716.8637,190.55 35.000 4,207.67 Start Dir 12º/100' : 8746.62' MD, 186.62'TVD 8,750.00 98.07 7,242.08 2,340.44 3,580.0630.06 561,817.0306,031,719.7667,190.08 12.004 4,210.88 8,775.00 98.58 7,238.46 2,362.16 3,591.8927.07 561,828.6866,031,741.5787,186.46 12.000 4,234.39 8,800.00 99.06 7,234.62 2,384.44 3,602.5524.08 561,839.1756,031,763.9407,182.62 12.000 4,257.42 8,825.00 99.52 7,230.59 2,407.22 3,612.0221.07 561,848.4676,031,786.7897,178.59 12.000 4,279.94 8,850.00 99.95 7,226.36 2,430.43 3,620.2718.06 561,856.5366,031,810.0657,174.36 12.000 4,301.86 8,875.00 100.36 7,221.95 2,454.02 3,627.2815.04 561,863.3616,031,833.7027,169.95 12.000 4,323.13 8,900.00 100.74 7,217.37 2,477.91 3,633.0312.02 561,868.9226,031,857.6367,165.37 12.000 4,343.69 8,925.00 101.09 7,212.64 2,502.04 3,637.518.98 561,873.2056,031,881.8027,160.64 12.000 4,363.49 8,950.00 101.41 7,207.76 2,526.35 3,640.695.94 561,876.1986,031,906.1337,155.76 12.000 4,382.48 8,975.00 101.70 7,202.75 2,550.77 3,642.582.89 561,877.8936,031,930.5627,150.75 12.000 4,400.59 8,986.62 101.82 7,200.38 2,562.14 3,643.011.47 561,878.2376,031,941.9347,148.38 12.000 4,408.70 9,000.00 100.50 7,197.79 2,575.26 3,643.452.41 561,878.5796,031,955.0527,145.79 12.000 4,418.01 9,025.00 98.03 7,193.77 2,599.89 3,644.874.14 561,879.7966,031,979.6917,141.77 12.000 4,435.93 9,050.00 95.56 7,190.81 2,624.61 3,647.035.85 561,881.7636,032,004.4327,138.81 12.000 4,454.45 9,075.00 93.08 7,188.93 2,649.37 3,649.937.54 561,884.4756,032,029.2077,136.93 12.000 4,473.54 9,100.00 90.60 7,188.12 2,674.09 3,653.589.23 561,887.9256,032,053.9507,136.12 12.000 4,493.13 9,125.00 88.12 7,188.40 2,698.70 3,657.9510.91 561,892.1026,032,078.5927,136.40 12.000 4,513.19 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 5 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 7,137.77 Vert Section 9,150.00 85.64 7,189.77 2,723.13 3,663.0312.60 561,896.9956,032,103.0657,137.77 12.000 4,533.64 9,161.62 84.48 7,190.77 2,734.42 3,665.6413.39 561,899.5106,032,114.3677,138.77 12.000 4,543.27 9,175.00 84.49 7,192.05 2,747.32 3,668.9015.00 561,902.6746,032,127.2997,140.05 12.000 4,554.50 9,200.00 84.50 7,194.45 2,771.18 3,675.9718.02 561,909.5586,032,151.2077,142.45 12.000 4,576.00 9,225.00 84.53 7,196.84 2,794.63 3,684.2921.03 561,917.6896,032,174.7217,144.84 12.000 4,598.13 9,250.00 84.58 7,199.21 2,817.62 3,693.8324.04 561,927.0456,032,197.7767,147.21 12.000 4,620.83 9,261.62 84.60 7,200.31 2,828.12 3,698.6725.44 561,931.8066,032,208.3227,148.31 12.000 4,631.56 9,275.00 84.61 7,201.57 2,840.07 3,704.5627.06 561,937.6026,032,220.3107,149.57 12.000 4,644.04 9,300.00 84.62 7,203.92 2,861.93 3,716.4630.07 561,949.3286,032,242.2587,151.92 12.000 4,667.69 9,325.00 84.65 7,206.25 2,883.13 3,729.4933.08 561,962.1936,032,263.5607,154.25 12.000 4,691.71 9,350.00 84.70 7,208.57 2,903.62 3,743.6236.10 561,976.1606,032,284.1587,156.57 12.000 4,716.04 9,375.00 84.76 7,210.87 2,923.34 3,758.8139.11 561,991.1926,032,303.9957,158.87 12.000 4,740.62 9,400.00 84.83 7,213.14 2,942.24 3,775.0142.12 562,007.2476,032,323.0167,161.14 12.000 4,765.37 9,425.00 84.92 7,215.38 2,960.26 3,792.1945.13 562,024.2816,032,341.1717,163.38 12.000 4,790.23 9,450.00 85.02 7,217.57 2,977.36 3,810.2948.14 562,042.2486,032,358.4087,165.57 12.000 4,815.13 9,475.00 85.14 7,219.71 2,993.48 3,829.2751.15 562,061.0986,032,374.6817,167.71 12.000 4,840.00 9,500.00 85.26 7,221.81 3,008.59 3,849.0854.16 562,080.7806,032,389.9457,169.81 12.000 4,864.78 9,525.00 85.41 7,223.84 3,022.65 3,869.6557.16 562,101.2396,032,404.1597,171.84 12.000 4,889.39 9,536.62 85.48 7,224.76 3,028.81 3,879.4658.56 562,111.0006,032,410.3987,172.76 12.000 4,900.76 9,550.00 85.45 7,225.82 3,035.92 3,890.7456.95 562,122.2216,032,417.6007,173.82 12.000 4,913.85 9,575.00 85.41 7,227.81 3,050.06 3,911.2653.94 562,142.6306,032,431.8917,175.81 12.000 4,938.48 9,600.00 85.38 7,229.82 3,065.25 3,931.0150.93 562,162.2596,032,447.2347,177.82 12.000 4,963.27 9,625.00 85.37 7,231.84 3,081.45 3,949.9447.92 562,181.0566,032,463.5867,179.84 12.000 4,988.16 9,650.00 85.37 7,233.86 3,098.63 3,967.9844.91 562,198.9676,032,480.9017,181.86 12.000 5,013.07 9,675.00 85.38 7,235.87 3,116.73 3,985.1141.90 562,215.9456,032,499.1347,183.87 12.000 5,037.95 9,700.00 85.40 7,237.88 3,135.71 4,001.2538.89 562,231.9426,032,518.2337,185.88 12.000 5,062.71 9,725.00 85.44 7,239.88 3,155.50 4,016.3835.88 562,246.9166,032,538.1477,187.88 12.000 5,087.30 9,750.00 85.49 7,241.85 3,176.07 4,030.4632.87 562,260.8246,032,558.8217,189.85 12.000 5,111.64 9,775.00 85.55 7,243.81 3,197.35 4,043.4329.87 562,273.6286,032,580.1977,191.81 12.000 5,135.67 9,800.00 85.62 7,245.73 3,219.28 4,055.2726.86 562,285.2956,032,602.2197,193.73 12.000 5,159.33 9,825.00 85.71 7,247.62 3,241.80 4,065.9423.85 562,295.7906,032,624.8247,195.62 12.000 5,182.54 9,850.00 85.81 7,249.47 3,264.86 4,075.4220.84 562,305.0876,032,647.9527,197.47 12.000 5,205.25 9,875.00 85.92 7,251.27 3,288.38 4,083.6817.84 562,313.1596,032,671.5387,199.27 12.000 5,227.39 9,900.00 86.04 7,253.03 3,312.31 4,090.6914.83 562,319.9846,032,695.5197,201.03 12.000 5,248.90 9,925.00 86.17 7,254.73 3,336.58 4,096.4411.83 562,325.5446,032,719.8287,202.73 12.000 5,269.72 9,950.00 86.31 7,256.37 3,361.12 4,100.918.83 562,329.8236,032,744.3997,204.37 12.000 5,289.80 9,961.62 86.38 7,257.11 3,372.60 4,102.557.43 562,331.3736,032,755.8937,205.11 12.000 5,298.86 9,975.00 86.46 7,257.94 3,385.81 4,104.479.04 562,333.1816,032,769.1207,205.94 12.000 5,309.31 10,000.00 86.63 7,259.45 3,410.35 4,109.0312.04 562,337.5516,032,793.6837,207.45 12.000 5,329.45 10,025.00 86.81 7,260.88 3,434.61 4,114.8715.04 562,343.2026,032,817.9897,208.88 12.000 5,350.34 10,050.00 86.99 7,262.23 3,458.54 4,121.9718.04 562,350.1186,032,841.9697,210.23 12.000 5,371.91 10,075.00 87.19 7,263.50 3,482.06 4,130.3221.03 562,358.2806,032,865.5607,211.50 12.000 5,394.12 10,100.00 87.39 7,264.68 3,505.13 4,139.8924.03 562,367.6666,032,888.6957,212.68 12.000 5,416.89 10,125.00 87.59 7,265.78 3,527.66 4,150.6527.03 562,378.2516,032,911.3127,213.78 12.000 5,440.18 10,136.62 87.69 7,266.26 3,537.94 4,156.0528.42 562,383.5726,032,921.6327,214.26 12.000 5,451.16 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 6 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Inclination (°) Azimuth (°) +E/-W (usft) Map Northing (usft) Map Easting (usft) +N/-S (usft) Planned Survey Vertical Depth (usft) TVDss usft DLS 7,214.73 Vert Section 10,150.00 88.24 7,266.73 3,549.61 4,162.5729.93 562,389.9966,032,933.3547,214.73 12.000 5,463.90 10,175.00 89.27 7,267.27 3,570.96 4,175.5732.75 562,402.8246,032,954.7997,215.27 12.000 5,488.00 10,200.00 90.31 7,267.36 3,591.65 4,189.6035.56 562,416.6946,032,975.5927,215.36 12.000 5,512.40 10,225.00 91.34 7,267.01 3,611.62 4,204.6338.38 562,431.5676,032,995.6777,215.01 12.000 5,537.03 10,236.62 91.82 7,266.69 3,620.64 4,211.9539.69 562,438.8136,033,004.7587,214.69 12.000 5,548.55 10,250.00 93.21 7,266.10 3,630.98 4,220.4138.89 562,447.1936,033,015.1667,214.10 12.000 5,561.80 10,275.00 95.80 7,264.14 3,650.58 4,235.8037.38 562,462.4256,033,034.8857,212.14 12.000 5,586.44 10,300.00 98.39 7,261.05 3,670.49 4,250.6035.85 562,477.0646,033,054.9087,209.05 12.000 5,610.86 10,325.00 100.98 7,256.84 3,690.66 4,264.7634.31 562,491.0686,033,075.1807,204.84 12.000 5,634.99 10,350.00 103.56 7,251.53 3,711.02 4,278.2532.74 562,504.3996,033,095.6447,199.53 12.000 5,658.77 10,375.00 106.13 7,245.13 3,731.52 4,291.0431.14 562,517.0216,033,116.2467,193.13 12.000 5,682.14 10,400.00 108.68 7,237.65 3,752.11 4,303.0829.49 562,528.8996,033,136.9287,185.65 12.000 5,705.02 10,416.62 110.37 7,232.09 3,765.82 4,310.6628.37 562,536.3696,033,150.6977,180.09 12.000 5,719.94 10,425.00 110.42 7,229.17 3,772.77 4,314.3227.30 562,539.9806,033,157.6687,177.17 12.000 5,727.36 10,450.00 110.53 7,220.43 3,793.87 4,324.4824.10 562,549.9676,033,178.8467,168.43 12.000 5,749.22 10,475.00 110.58 7,211.65 3,815.49 4,333.4320.89 562,558.7516,033,200.5377,159.65 12.000 5,770.57 10,500.00 110.57 7,202.86 3,837.58 4,341.1617.69 562,566.3086,033,222.6837,150.86 12.000 5,791.34 10,516.62 110.53 7,197.02 3,852.49 4,345.6115.56 562,570.6436,033,237.6297,145.02 12.000 5,804.80 10,525.00 109.53 7,194.16 3,860.08 4,347.7215.56 562,572.6946,033,245.2277,142.16 12.000 5,811.54 10,550.00 106.53 7,186.42 3,882.98 4,354.1015.56 562,578.8896,033,268.1737,134.42 12.000 5,831.88 10,575.00 103.53 7,179.94 3,906.23 4,360.5815.56 562,585.1816,033,291.4797,127.94 12.000 5,852.53 10,600.00 100.53 7,174.73 3,929.79 4,367.1315.56 562,591.5546,033,315.0807,122.73 12.000 5,873.45 10,625.00 97.53 7,170.81 3,953.57 4,373.7515.56 562,597.9886,033,338.9127,118.81 12.000 5,894.58 10,650.00 94.53 7,168.19 3,977.52 4,380.4215.56 562,604.4676,033,362.9107,116.19 12.000 5,915.85 10,675.00 91.53 7,166.87 4,001.57 4,387.1215.56 562,610.9736,033,387.0077,114.87 12.000 5,937.21 10,700.00 88.53 7,166.86 4,025.65 4,393.8215.56 562,617.4886,033,411.1387,114.86 12.000 5,958.60 10,726.62 85.33 7,168.28 4,051.25 4,400.9515.56 562,624.4156,033,436.7987,116.28 12.000 5,981.34 10,750.00 85.29 7,170.20 4,073.54 4,407.7518.37 562,631.0386,033,459.1317,118.20 12.000 6,001.57 10,775.00 85.25 7,172.26 4,096.96 4,416.2221.38 562,639.3236,033,482.6227,120.26 12.000 6,023.80 10,800.00 85.23 7,174.33 4,119.91 4,425.9124.39 562,648.8306,033,505.6457,122.33 12.000 6,046.58 10,825.00 85.22 7,176.41 4,142.32 4,436.7927.40 562,659.5346,033,528.1367,124.41 12.000 6,069.86 10,850.00 85.23 7,178.49 4,164.13 4,448.8330.41 562,671.4036,033,550.0347,126.49 12.000 6,093.58 10,875.00 85.25 7,180.57 4,185.27 4,462.0033.42 562,684.4066,033,571.2797,128.57 12.000 6,117.66 10,900.00 85.28 7,182.63 4,205.70 4,476.2636.43 562,698.5086,033,591.8127,130.63 12.000 6,142.05 10,925.00 85.32 7,184.68 4,225.35 4,491.5839.44 562,713.6696,033,611.5787,132.68 12.000 6,166.67 10,950.00 85.38 7,186.70 4,244.16 4,507.9142.45 562,729.8486,033,630.5227,134.70 12.000 6,191.46 10,975.00 85.45 7,188.70 4,262.10 4,525.2045.46 562,747.0016,033,648.5927,136.70 12.000 6,216.35 11,000.00 85.53 7,190.67 4,279.11 4,543.4248.47 562,765.0816,033,665.7387,138.67 12.000 6,241.27 11,016.00 85.59 7,191.90 4,289.48 4,555.5450.39 562,777.1156,033,676.2067,139.90 12.000 6,257.20 Total Depth : 11016' MD, 289.38' TVD - 2 3/8" x 3 1/4" 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 7 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Target Name - hit/miss target - Shape TVD (usft) Northing (usft) Easting (usft) +N/-S (usft) +E/-W (usft) Tar gets Dip Angle (°) Dip Dir. (°) MPC-11L1 wp03 tgt11 7,465.00 6,036,879.000 564,312.0007,480.46 6,115.620.00 0.00 -plan misses target center by 3562.41usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt01 7,149.00 6,031,771.000 561,796.0002,391.84 3,559.430.00 0.00 -plan misses target center by 96.12usft at 8804.23usft MD (7233.96 TVD, 2388.26 N, 3604.24 E) - Point MPC-11L1 wp03 tgt06 7,279.00 6,034,827.000 563,198.0005,437.05 4,985.470.00 0.00 -plan misses target center by 1228.55usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt05 7,252.00 6,034,347.000 562,999.0004,958.58 4,782.690.00 0.00 -plan misses target center by 709.16usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt08 7,322.00 6,035,290.000 563,429.0005,898.27 5,220.110.00 0.00 -plan misses target center by 1745.51usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt07 7,290.00 6,035,066.000 563,297.0005,675.29 5,086.340.00 0.00 -plan misses target center by 1487.23usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt10 7,377.00 6,035,736.000 563,695.0006,342.22 5,489.620.00 0.00 -plan misses target center by 2262.85usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt02 7,257.00 6,032,857.000 562,364.0003,473.46 4,135.970.00 0.00 -plan misses target center by 10.38usft at 10068.46usft MD (7263.18 TVD, 3475.95 N, 4128.02 E) - Point MPC-11L1 wp03 tgt04 7,157.00 6,033,381.000 562,616.0003,995.52 4,392.100.00 0.00 -plan misses target center by 11.89usft at 10671.04usft MD (7166.99 TVD, 3997.75 N, 4386.05 E) - Point MPC-11L1 wp03 tgt12 7,477.00 6,037,108.000 564,435.0007,708.51 6,240.420.00 0.00 -plan misses target center by 3822.29usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt09 7,352.00 6,035,513.000 563,562.0006,120.25 5,354.860.00 0.00 -plan misses target center by 2004.06usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point MPC-11L1 wp03 tgt03 7,262.00 6,033,104.000 562,470.0003,719.64 4,243.920.00 0.00 -plan misses target center by 34.32usft at 10336.27usft MD (7254.58 TVD, 3699.81 N, 4270.93 E) - Point MPC-11L1 wp03 tgt13 7,479.00 6,037,336.000 564,558.0007,935.56 6,365.210.00 0.00 -plan misses target center by 4080.59usft at 11016.00usft MD (7191.90 TVD, 4289.48 N, 4555.54 E) - Point 2 3/8" x 3 1/4"7,191.9011,016.00 2-3/8 3-1/4 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 8 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Hilcorp Alaska, LLC Milne Point M Pt C Pad Halliburton Standard Proposal Report Well: Wellbore: MPC-11 Plan: MPU C-11A Survey Calculation Method:Minimum Curvature 20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri Design:MPU C-11A wp03 Database:NORTH US + CANADA MD Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic dri North Reference: Well MPC-11 True Measured Depth (usft) Vertical Depth (usft) +E/-W (usft) +N/-S (usft) Local Coordinates Comment Plan Annotations 8,540.00 7,157.12 2,208.01 3,462.42 KOP : Start Dir 9º/100' : 8540' MD, 0'TVD : 15° RT TF 8,560.00 7,173.29 2,214.36 3,472.34 Start Dir 35º/100' : 8560' MD, 20'TVD 8,746.62 7,242.55 2,337.55 3,578.37 Start Dir 12º/100' : 8746.62' MD, 186.62'TVD 11,016.00 7,191.90 2,562.14 3,643.01 Total Depth : 11016' MD, 289.38' TVD 12/7/2020 2:19:29PM COMPASS 5000.15 Build 91E Page 9 07 December, 2020Milne PointM Pt C PadMPC-11Plan: MPU C-11A5002921321MPU C-11A wp03Reference Design: M Pt C Pad - MPC-11 - Plan: MPU C-11A - MPU C-11A wp03Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Well Coordinates: 6,029,351.58 N, 558,255.76 E (70° 29' 26.89" N, 149° 31' 25.54" W)Datum Height: 20 : 11 4/12/1985 00:00 @ 52.00usft (generic drilling rig)Scan Range: 8,540.00 to 11,016.00 usft. Measured Depth.Geodetic Scale Factor AppliedVersion: 5000.15 Build: 91EScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftGLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of referenceScan Type:Scan Type:25.00 Milne PointHilcorp Alaska, LLCAnticollision Report for MPC-11 - MPU C-11A wp03Comparison Well Name - Wellbore Name - Design@MeasuredDepth(usft)MinimumDistance(usft)EllipseSeparation(usft)@MeasuredDepthusftClearanceFactorScan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,500.00 usftSite NameScan Range: 8,540.00 to 11,016.00 usft. Measured Depth. Closest Approach 3D Proximity Scan on Current Survey Data (Highside Reference)Reference Design: M Pt C Pad - MPC-11 - Plan: MPU C-11A - MPU C-11A wp03MeasuredDepth(usft)Summary Based on MinimumSeparation WarningM Pt C PadMPC-11 - MPC-11 - MPC-11184.83 8,840.00 174.85 8,739.63 18.5378,840.00Clearance Factor Pass - MPU C-47 - MPU C-47 - MPU C-47 wp2457.6710,640.00-35.7010,715.060.61810,640.00Clearance FactorFAIL - MPU C-47 - MPU C-47 - MPU C-47 wp2439.1410,685.63-7.3510,736.380.84210,685.63Centre DistanceFAIL - MPU C-47 - MPU C-47PB1 - MPU C-47 PB1177.0710,831.87-27.1310,293.000.86710,831.87Centre DistanceFAIL - MPU C-47 - MPU C-47PB1 - MPU C-47 PB1188.9310,915.00-188.3210,293.000.50110,915.00Clearance FactorFAIL - MPU C-47 - MPU C-47PB2 - MPU C-47 PB2545.14 10,690.00 185.03 10,048.40 1.51410,690.00Clearance Factor Pass - MPU C-47 - MPU C-47PB2 - MPU C-47 PB2523.01 10,740.00 180.53 10,072.17 1.52710,740.00Ellipse Separation Pass - MPU C-47 - MPU C-47PB2 - MPU C-47 PB2499.34 10,858.88 195.63 10,132.47 1.64410,858.88Centre Distance Pass - MPU C-47 - MPU C-47PB3 - MPU C-47 PB3645.58 10,640.00 317.01 9,940.94 1.96510,640.00Clearance Factor Pass - MPU C-47 - MPU C-47PB3 - MPU C-47 PB3619.55 10,715.00 309.63 9,979.21 1.99910,715.00Ellipse Separation Pass - MPU C-47 - MPU C-47PB3 - MPU C-47 PB3605.38 10,811.13 318.38 10,032.36 2.10910,811.13Centre Distance Pass - Survey tool programFrom(usft)To(usft)Survey/Plan Survey Tool100.00 8,540.003_CB-Film-GMS8,540.00 8,940.00 MPU C-11A wp03 3_MWD_Interp Azi+Sag8,940.00 11,016.00 MPU C-11A wp03 3_MWD+IFR2+MS+SagEllipse error terms are correlated across survey tool tie-on points.Separation is the actual distance between ellipsoids.Calculated ellipses incorporate surface errors.Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation).Distance Between centres is the straight line distance between wellbore centres.All station coordinates were calculated using the Minimum Curvature method.07 December, 2020-14:21COMPASSPage 2 of 4 0.001.503.004.50Separation Factor8550 8700 8850 9000 9150 9300 9450 9600 9750 9900 10050 10200 10350 10500 10650 10800 10950 11100Measured DepthMPC-11MPU C-47 wp24MPU C-47 PB1MPU C-47 PB2MPU C-47 PB3No-Go Zone - Stop DrillingCollision Avoidance Req.Collision Risk Procedures Req.WELL DETAILS:MPC-11 NAD 1927 (NADCON CONUS)Alaska Zone 04Ground Level: 0.00+N/-S +E/-W Northing Easting Latittude Longitude0.000.006029351.580558255.76170° 29' 26.894 N 149° 31' 25.542 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well MPC-11, True NorthVertical (TVD) Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic drilling rig)Measured Depth Reference:20 : 11 4/12/1985 00:00 @ 52.00usft (generic drilling rig)Calculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2020-12-07T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool100.00 8540.00 1 : Camera based gyro multisho (MPC-11) 3_CB-Film-GMS8540.00 8940.00 MPU C-11A wp03 (Plan: MPU C-11A) 3_MWD_Interp Azi+Sag8940.00 11016.00 MPU C-11A wp03 (Plan: MPU C-11A) 3_MWD+IFR2+MS+Sag0.0035.0070.00105.00140.00175.00Centre to Centre Separation (60.00 usft/in)8550 8700 8850 9000 9150 9300 9450 9600 9750 9900 10050 10200 10350 10500 10650 10800 10950 11100Measured DepthGLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference8540.00 To 11016.00Project: Milne PointSite: M Pt C PadWell: MPC-11Wellbore: Plan: MPU C-11APlan: MPU C-11A wp03CASING DETAILSTVD TVDSS MD Size Name7191.90 7139.90 11016.00 2-3/8 2 3/8" x 3 1/4" _____________________________________________________________________________________ Revised By: JNL 12/8/2020 PROPOSED SCHEMATIC Milne Point Unit Well: MP C-11A Last Completed: TBD PTD: TBD 4-1/2” SOLID Liner 4-1/2” SLOTTED Liner Jts Top (MD) Btm (MD) Top (TVD Btm (TVD) Jts Top (MD) Btm (MD Top (TVD Btm (TVD) TD =11,016’ (MD) / TD =7,192’(TVD) Initial KB Elev.: 52’ (Alaska United #3) Ground level: 17’ 7” Top of Cement @ ~8423’ 6 2-3/8” 15 9-5/8” 1 4 4 Solid to Slotted Liner TBD PBTD =11,016’(MD) / PBTD =7,192’(TVD) Top of Liner @ ±8410’ 13-3/8” 2 3 5 7 Estimated Top of Cement @ 7,850’ CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,540’ 0.0383 2-3/8” Liner 4.7# / L-80 / Hyd625 8,410’ 11,016’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 58,423’ST 2:Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 68,463’ST 1:Port= 12 Dev.= 35, VLV= 400 BPD Orifice , TVD= 7,094’, 12/9/1990 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID OPEN HOLE / CEMENT DETAIL 12-1/4” 1875 sks Permafrost E plus 220 sks 9-5/8" x 7” 30 bbls Permafrost C in Annulus 8-1/2” 265 sks Class G 3-1/4” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 1250’ Max Hole Angle = 42.5° @ 4,600’ Hole Angle thru perforations= 36° A Sidetrack KOP 8540’ TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 MPU C-11 Drilled Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 A Sidetrack Completed: TBD See Schematics on Following Pages Well Blank Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 0.0 ft Top Annular Element 0.7 ft Bottom Annular 2.0 ft CL Blind/Shears 3.3 ft CL 2" Combi's 4.1 ft B5 B6 B7 B8 Deployment Line Choke Line CL 2-3/8" Combi's 6.6 ft CL 2 3/8" Combi's 7.4 ft B1 B2 B3 B4 Choke Line Kill Line CL Blind/Shears 10.0 ft CL 2" Combi's 10.7 ft CL of Top Swab 13.3 ft Swab 2 Test Pump Hose Swab 1 CL of Bottom Swab 14.8 ft T1 T2 CL Flow Tee 16.2 ft BOP2 CL of SSV 17.5 ft Master 2 Fusable CL of Master Valve 19.0 ft Master 1 LDS 20.5 ft Gound Level CDR2-AC BOP Schematic CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box BOP1 Hydril 7 1/16" Annular Blind/Shear 2" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2 3/8" Pipe/Slips IA OA 2 "Pipe/Slips Blind/Shear _____________________________________________________________________________________ Revised By: DH 4/19/2020 SCHEMATIC Milne Point Unit Well: MP C-11 Last Completed: 12/10/1990 PTD: 185-059 TD =8,990’ (MD) / TD =7,527’(TVD) Initial KB Elev.:52’(Alaska United #3) Ground level: 17’ 7” 6 15 9-5/8 ” 1 4 4 MIN ID = 2.750” @ 8,652’ Lower ECP @8,698’ PBTD =8,901’ (MD) / PBTD =7,453’(TVD) 10 13-3/8” 2 3 5 7 Estimated Top of Cement @ 7,850’ 8 11 9 Upper ECP @ 8,676’ CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.151” Surface 8,982’ 0.0383 TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB” Packer, ID = 3.80” 4 8,389’ Camco V-1 Selective Nipple, ID = 2.812” GLM Detail –3-1/2” x 1-1/2” MMG-2 58,423’ST 2:Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 68,463’ST 1:Port= 12 Dev.= 35, VLV= 400 BPD Orifice , TVD= 7,094’, 12/9/1990 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 8,628’ Baker C.L. Seal Assembly with locator, ID = 3.00” 9 8,629’ Baker ‘2-B’ Permanent Packer with Millout Extension 10 8,652’ Camco ‘D’ Nipple,ID = 2.750” 11 8,661’ Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Shot Date Status Size KUP C 8,506’ 8,526’ 7,129’ 7,146’ 20 4/25/1985 Open 5” KUP B 8,600’ 8,604’ 7,206’ 7,209’ 4 4/25/1985 Open 5 KUP A 8,700’ 8,720’ 7,287’ 7,304’ 20 4/25/1985 Open 2-5/8” KUP A 8,734’ 8,762’ 7,315’ 7,338’ 28 4/25/1985 Open 5” Ref Log: DIL Log 4/22/1985 OPEN HOLE / CEMENT DETAIL 9-5/8” 1875 sks Permafrost E plus 220 sks Class G in 12-1/4” hole 9-5/8" x 7” 30 bbls Permafrost C in Annulus 7” 265 sks Class G in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1250’ Max Hole Angle = 42.5° @ 4,600’ Hole Angle thru perforations= 36° TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-00-00 Drilled and Completed by Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 Shut In Long-term – 4/30/2010 Pre-prep Work Existing Well Schematic _____________________________________________________________________________________ Revised By: IAT 12/29/2020 PROPOSED Milne Point Unit Well: MP C-11 Last Completed: 12/9/1990 PTD: 185-059 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,982’ 0.0383 TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 5 8,423’ ST 2: Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 6 8,463’ ST 1: Open 12/26/2020 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID 8 8,628’ Baker C.L. Seal Assembly with locator, ID = 3.00” 9 8,629’ Baker ‘2-B’ Permanent Packer with Millout Extension 10 8,652’ Camco ‘D’ Nipple, ID = 2.750” 11 8,661’ Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Shot Date Status Size KUP C 8,506’ 8,526’ 7,129’ 7,146’ 20 4/25/1985 Closed 5” KUP B 8,600’ 8,604’ 7,206’ 7,209’ 4 4/25/1985 Closed 5 KUP A 8,700’ 8,720’ 7,287’ 7,304’ 20 4/25/1985 Closed 2-5/8” KUP A 8,734’ 8,762’ 7,315’ 7,338’ 28 4/25/1985 Closed 5” Ref Log: DIL Log 4/22/1985 OPEN HOLE / CEMENT DETAIL 9-5/8” 1875 sks Permafrost E plus 220 sks Class G in 12-1/4” hole 9-5/8" x 7” 30 bbls Permafrost C in Annulus 7” 265 sks Class G in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 1250’ Max Hole Angle = 42.5° @ 4,600’ Hole Angle thru perforations= 36° TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-00-00 Drilled and Completed by Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 LTSI - SI on 3/10/1995 Prepped for CTD w/ Whipstock POST Sundry 320-545 _____________________________________________________________________________________ Revised By: JNL 12/8/2020 PROPOSED SCHEMATIC Milne Point Unit Well: MP C-11A Last Completed: TBD PTD: TBD 4-1/2” SOLID Liner 4-1/2” SLOTTED Liner Jts Top (MD) Btm (MD) Top (TVD Btm (TVD) Jts Top (MD) Btm (MD Top (TVD Btm (TVD) CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 13-3/8” Conductor 48# / H-40 / N/A 12.715” Surface 115’ 0.1571 9-5/8" Surface 36# / K-55 / BTRC 8.921” Surface 5,506’ 0.0773 7" Production 26# / L-80 / BTRC 6.276” Surface 8,540’ 0.0383 2-3/8” Liner 4.7# / L-80 / Hyd625 8,410’ 11,016’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / 8RD EUE 2.992” Surface 8,661’ 0.0087 JEWELRY DETAIL No Depth Item 1 546’ 3-1/2” Camco TRDP-IAE NC SCSSV, ID= 2.812” 2 8,336’ Baker PBR, Seal Assembly 3 8,351’ Baker ‘HB’ Packer, ID = 3.80” 4 8,389’ Camco W-1 Selective Nipple, ID = 2.812” GLM Detail – 3-1/2” x 1-1/2” MMG-2 5 8,423’ ST 2: Port= 12, Dev.= 35, VLV= DMY, TVD= 7,061’, 12/9/1990 6 8,463’ ST 1: Port= 12 Dev.= 35, VLV= 400 BPD Orifice , TVD= 7,094’, 12/9/1990 7 8,504’ Blast Joint, 29.48’ length, 4.25” OD, 3.00” ID OPEN HOLE / CEMENT DETAIL 12-1/4” 1875 sks Permafrost E plus 220 sks 9-5/8" x 7” 30 bbls Permafrost C in Annulus 8-1/2” 265 sks Class G 3-1/4” Uncemented Solid / Slotted Liner WELL INCLINATION DETAIL KOP @ 1250’ Max Hole Angle = 42.5° @ 4,600’ Hole Angle thru perforations= 36° A Sidetrack KOP 8540’ TREE & WELLHEAD Tree 3-1/8” 5K FMC Wellhead 11” x 7” 5M FMC NSCT, w/ 3.5” FMC Tubing Hanger CIW 3.5” H BPV Profile GENERAL WELL INFO API: 50-029-21321-01-00 MPU C-11 Drilled Alaska United #3 – 4/26/1985 Converted to water injector - 12/4/1985 RWO – 9/25/1989 RWO by EWS Rig #4 – 12/9/1990 A Sidetrack Completed: TBD 8661' Final 8982' C-11 Parent TOWS 8540' From:Sean Mclaughlin To:Boyer, David L (CED) Cc:Davies, Stephen F (CED) Subject:RE: [EXTERNAL] MPU C-11A PTD Review Date:Friday, January 8, 2021 9:21:58 AM Hi Dave, No plans to pre-produce C-11. The “No H2S at MPU” on the PTD was historically what was submitted for coil sidetracks at MPU. We should be a bit more specific for each pad. MPC pad is not considered a high H2S pad. The highest recorded H2S well on the pad was from MPC-14 (19.8ppm) in 2009. The H2S hazard while drilling MPC-11A is considered low. It doesn’t seem fair to require additional measures for all of Milne Point Kuparuk. Hopefully we can still make a pad by pad determination. Also, historically high H2S wells/pads were above 100 ppm. This is supported by API 49 as well. The only 20 ppm rule I recall is for AOGCC notification if encountered (surface reading). Regards, sean From: Boyer, David L (CED) [mailto:david.boyer2@alaska.gov] Sent: Thursday, January 7, 2021 5:06 PM To: Sean Mclaughlin <Sean.Mclaughlin@hilcorp.com> Cc: Davies, Stephen F (CED) <steve.davies@alaska.gov> Subject: [EXTERNAL] MPU C-11A PTD Review Hi Sean, I began the review of the 401 for MPU C-11A received today. I have two questions needing clarification. 1) Since the well is a water injector, will it be pre-produced? If so, for how many days/months? 2) Because the Kuparuk in Milne Point is in a mature waterflood, the Kuparuk targeted wells in Milne Point are considered as requiring H2S measures by AOGCC. Do you have specific H2S measurements from MPU C-Pad wells indicating all H2S values <20ppm in the Kuparuk reservoir? Schrader Bluff targeted wells in MPU do not require H2S measurements. Thank you, Dave Boyer AOGCC The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Revised 2/2015 TRANSMITTAL LETTER CHECKLIST WELL NAME: ______________________________________ PTD: _____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD: ____________________________ POOL: ______________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit No. _____________, API No. 50-_______________________. Production should continue to be reported as a function of the original API number stated above. Pilot Hole In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (_______________________PH) and API number (50-_____________________) from records, data and logs acquired for well (name on permit). Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (_____________________________) as Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for well ( ) until after ( ) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (________________________) must contact the AOGCC to obtain advance approval of such water well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (_______________________________) in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. 221-001 Kuparuk Oil X X MPU C-11A X Milne Point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dts 1/13/2021JLC 1/13/2021