Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout196-162Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 6/27/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240627 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# KBU 43-07Y 50133206250000 214019 6/6/2024 AK E-LINE Perf KBU 43-07Y 50133206250000 214019 6/10/2024 AK E-LINE Perf KBU 43-07Y 50133206250000 214019 6/12/2024 AK E-LINE Perf MPU F-6650029226970ϭ00 1961ϲϮ 5/17/2024 AK E-LINE Perf MRU K-03RD2 50733200740200 217029 5/25/2024 AK E-LINE TubingPunch PAXTON 2 50133205730000 207164 5/16/2024 AK E-LINE Pref PAXTON 2 50133205730000 207164 5/30/2024 AK E-LINE TubingPatch PAXTON 11 50133207040000 221114 5/20/2024 AK E-LINE Perf SCU 13-09 50133203430000 181098 6/2/2024 AK E-LINE Cement/JetCut SDI 3-07A 50029219110100 198147 5/28/2024 AK E-LINE Pkr/Poglm SRU 14B-27 50133206040000 212089 6/15/2024 AK E-LINE JewelryLog SRU 32C-15 50133206130000 213070 6/13/2024 AK E-LINE TubingCut Revision Explanation: There are additional images added to the final report and a few new .las files. In the Emeraude folder there are 2 new .las files and in the Field Data folder the RIH and POOH are new .las files Please include current contact information if different from above. T39076 T39076 T39076 T39077 T39078 T39079 T39079 T39080 T39081 T39082 T39083 T39084 MPU F-6650029226970ϭ00 1961ϲϮ 5/17/2024 AK E-LINE Perf Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.06.27 13:09:17 -08'00' 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: ESP Swap Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 18,823 feet N/A feet true vertical 7,793 feet N/A feet Effective Depth measured 18,718 feet N/A feet true vertical 7,719 feet N/A feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)2-7/8" 6.5# / L-80 / EUE 8rd 18,080' 7,301' Packers and SSSV (type, measured and true vertical depth)N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Wells Manager Contact Phone: N/A Ryan Lewis ryan.lewis@hilcorp.com 303-906-5178 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 324-226 & 324-280 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 42014 0 1450 349 0 Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 174 Gas-Mcf MD 112' 140 Size 112' 4,506' 100 ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018 MILNE POINT / KUPARUK RIVER OIL MILNE PT UNIT F-66A Plugs Junk measured STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 196-162 50-029-22697-01-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: Casing Conductor 18,799' 8,223'Surface Production 20" 9-5/8" 7" 112' 8,223' Length 5,750psi 7,240psi18,799' 7,776' Burst N/A Collapse N/A 3,090psi 5,410psi measured TVD N/A measured true vertical Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 11:58 am, Jun 13, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.06.13 11:44:32 - 08'00' Taylor Wellman (2143) RBDMS JSB 061924 WCB 8-30-2024 DSR-6/13/24 _____________________________________________________________________________________ Revised By TDF 6/11/2024 SCHEMATIC Milne Point Unit Well: MPU F-66A Last Completed: 5/22/2024 PTD: 196-162 TD =18,823’ (MD) / TD = 7,793’(TVD) 20” Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E) DF to Csg Tbg. Spool = 28.50’ (N 22E) 7” 3 12 & 13 14 9 9-5/8” 1 TOC Estimate: 13,579’ -14,784’ MD PBTD =18,718’ (MD) / PBTD = 7,719’(TVD) 4 15 2 KUP A Sands 5, 6, 7 & 8 9, 10 & 11 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758 7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 2.441 Surface 18,080’ 0.00579 JEWELRY DETAIL No Depth Item 1 198’STA# 2: 2-7/8" x 1" GLM, 1/4" DPSOV 2 17,823’STA# 1:2-7/8" x 1" GLM DGLV 3 17,911’ XN-nipple 2.313" / 2.205" No-Go 4 17,965’ Discharge Head w/ Ported Sub: HEAD S/A B/O 400PX 5 17,966’ Pump 4: PMP 400PMSSD 126 FLEX7 ER 6 17,988’ Pump 3: PMP 400PMSSD 126 FLEX7 ER 7 18,010’ Pump 2: PMP 400PMSSD 126 FLEX7 ER 8 18,032’ Pump 1: PMP 400PMSXD 024 GINPSHL HS 9 18,041.6’ KIT ADPTR FPX/GINT MNL FSTNR: (400 PMP x 513 Intake) 10 18,042’ Gas Separator: 538GM2T HV E V X MT HS FER 11 18,047’ INTAKE/ INTAKE GPXARCINT FER H6 12 18,048’ Upper Tandem Seal: GS3 B/B/L SB H6 PFSA HL FER 12CRC 13 18,055’ Lower Tandem Seal: GS3 B/B/L SB H6 PFSA HL FER 12CRC 14 18,062’ Motor: 562XP 150/1505/61/6R 12CRC 15 18,075’ Gauge w/ Centralizer:Bottom @ 18,080’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A Sands 18,370’ 18,422’ 7,497 7,533 52 5/18/2024 Open 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open 18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open 18,545’ 18,580’ 7,598’ 7,642’ 35 5/17/2024 Open Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4” OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24” Hole 9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole 7” 250 sx Class ‘G’ in a 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’ Hole Angle through perf interval = 47° TREE & WELLHEAD Tree 2-9/16” 5M CIW Wellhead 11” x 7” FMC Gen 5A 5M Double Actuated Gen 5 Wellhead GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E - 10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation – 12/21/2019 ESP Swap & Perf Add by ASR#1 – 5/22/2024 STIMULATION SUMMARY 10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe. Well Name Rig API Number Well Permit Number Start Date End Date MP F-66A ASR#1 50-029-22697-01-00 196-162 5/13/2024 5/22/2024 Continue testing BOPE (witness waived). Remove and replace: Mud Seals on Blind Rams, HCR x2, K5 Valve. Pull CTS/BPV, install landing joint, BOLDS. No operations to report. 5/11/2024 - Saturday MIRU Pits. . Lift Tree from Wellhead, install BOPE and secure. Lift Cellar, Rig Floor, Spacer Spools, and adapter spool. Level Rig and raise Mast. Lock in top section and tighten Guy lines. Install rack pins, RU TBG handling equipment, position, and RU Pipe Skate to rig floor. RU pipe sheds and hook up HYD and electrical. Accept rig 5/13/24 21:00hrs. Begin function and test BOPE 250/2500psi as per sundry (witness waived). 5/14/2024 - Tuesday 5/12/2024 - Sunday No operations to report. 5/13/2024 - Monday 5/10/2024 - Friday No operations to report. 5/8/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 5/9/2024 - Thursday No operations to report. Well Name Rig API Number Well Permit Number Start Date End Date MP F-66A ASR#1 50-029-22697-01-00 196-162 5/13/2024 5/22/2024 5/17/2024 - Friday Slickline drift w/ 20' x 3.70" Dummy Whipstock T/18,618' SLM. RU & Test E-line PCE T/ 250/2500psi. Correlate on depth w/18' correction. Perforate 18,545' - 18,580' w/ 3-3/8" 6SPF - 60deg phase. 5/15/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary Unable to pull completion. Pump 550bbls - 8.4ppg Source w/ NSX lub down IA taking returns through gas buster. 1.5BPM until catch returns @ 110bbls away. Increase rate to 2.5BPM @ 700psi. 34.4bph losses. Pull hanger 107K breakover, 93K Up. Cut ESP cable, lay down Hanger. POOH pumping 2x displacement. POOH F/ 18,106' - T/ 8,608'' pumping 2x displacement. 5/16/2024 - Thursday Cont. POOH w/ 2-7/8" ESP completion F/ 8,608' - T/ ESP while pumping 2x displacement. Lay down pumps and motors - minimal scale on OD. Both pumps seized, Motor spins freely. Recovered: 294CC Clamps, 8 Pump Clamps, 3 Protectolizers, 2 Flat Guards, 2 SS Bands. 77 additional bad joints - 278jts Total. Install Test Plug. ND Riser, Birdbath, Spool. RU Shooting Flange, QTS. Continue RIH F/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion @ 60FPM pumping 2x displacement. PU/MU TBG HNGR. Begin feed thru. RIH w/ 52' x 3-3/8" 6 SPF/60 deg. Phase Guns. Log up from 18,525'. Correlate 18'. Park CCL @ 18,356.2' + 13.8' = Top shot @ 18,370' - 18,422'. Static weight - 2073#. Arm and fire guns, weight drops to 1966#, PUH. Monitor well. R/D E-line. load spent guns onto trailer. Clean and clear rig floor. Load pipe shed of ESP equipment. Code 99 Blue called @ 09:10. crews on STBY. 5/18/2024 - Saturday Continue RIH F/ 1,126' - T/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion @ 60FPM pumping 2x displacement testing ESP systems every 1000'. 5/21/2024 - Tuesday 5/19/2024 - Sunday PU/MU & RIH w/ 2-7/8",6.5#,L, EUE R2 ESP completion T/1,126' while pumping 2x displacement. 5/20/2024 - Monday Top shot @ 18,370' - 18,422'. Continue RIH F/ 1,126' - T/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion Continue RIH F/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion Pull hanger 107K breakover, 93K Up. Cut ESP cable, lay down Hanger. POOH pumping 2x displacement. POOH Recovered: 294CC Clamps, 8 Pump Clamps, 3 Protectolizers, 2 Flat Guards, 2 SS Bands. 77 additional bad joints - 278jts Total. Well Name Rig API Number Well Permit Number Start Date End Date MP F-66A ASR#1 & WH 50-029-22697-01-00 196-162 5/13/2024 5/22/2024 No operations to report. No operations to report. 5/25/2024 - Saturday No operations to report. 5/28/2024 - Tuesday 5/26/2024 - Sunday No operations to report. 5/27/2024 - Monday 5/24/2024 - Friday No operations to report. 5/22/2024 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary Complete TBG HNGR splice. Land hanger. RILDS. L/D all ESpequip. B/D fluid lines. Remove SW from rig. Rig released at 06:00 ON 05/22/2024. Install BPV from rig floor, ASR moved off well. Nipple down BOPs, Nipple up adapter and tree. Tested adapter to 500 / 5000 psi for 10 mins, Pull BPV with dry rod, Secure wellhead and tree. 5/23/2024 - Thursday No operations to report. Complete TBG HNGR splice. Land hanger. RILDS Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 5/21/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240521 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# END 3-07A 50029219110100 198147 5/11/2024 HALLIBURTON Coilflag MPU E-19 50029227460000 197037 3/25/2024 READ CaliperSurvey MPU F-66A 50029226970100 196162 5/8/2024 READ CaliperSurvey MPI 1-27 50029216930000 187009 5/7/2024 READ PPROF MPU L-17 50029225390000 194169 5/8/2024 READ CaliperSurvey NCI A-12B 50883200320200 223053 5/2/2024 READ MAPP NCI A-17 50883201880000 223031 5/3/2024 READ MAPP PBU 11-41 50029237820000 224017 5/11/2024 HALLIBURTON RBT/Coilflag PBU D-31B 50029226720200 212168 5/12/2024 HALLIBURTON RBT PBU F-31A 50029216470100 212002 5/8/2024 READ CaliperSurvey PBU J-19 50029216290000 186135 5/2/2024 HALLIBURTON RBT PBU L-292 50029237510000 223025 5/6/2024 HALLIBURTON PPROF Please include current contact information if different from above. T38831 T38832 T38833 T38834 T38835 T38836 T38837 T38838 T38839 T38840 T38841 T38842 MPU F-66A 50029226970100 196162 5/8/2024 READ CaliperSurvey Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.05.22 09:57:50 -08'00' 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 18,823' N/A Casing Collapse Conductor N/A Surface 3,090psi Production 5,410psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng N/A and N/A N/A and N/A Ryan Lewis ryan.lewis@hilcorp.com 303-906-5178 Perforation Depth MD (ft): See Schematic See Schematic 2-7/8" 112' 20" 9-5/8" 7" 8,223' 18,799' MD N/A 5,750psi 7,240psi 4,506' 7,776' 8,223' 18,799' Length Size Proposed Pools: 112' 112' 6.5# / L-80 / EUE 8rd TVD Burst 18,106' MILNE POINT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018 196-162 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22697-01-00 Hilcorp Alaska LLC C.O. 432E1160 AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 5/15/2024 Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT F-66A KUPARUK RIVER OIL N/A 7,793' 18,718' 7,719' 1,160 N/A m n P s t p N 66 Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:24 pm, May 08, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.05.08 07:30:34 - 08'00' Taylor Wellman (2143) * BOPE test to 2500 psi. * Eline perforating with PCE as described. Perforate 10-404 MGR13MAY24 13-MAY-2024 SFD Mel Rixse Yes SFD 5/13/2024JLC 5/13/2024 ESP Swap and Perf Add Well: MPU F-66A Date: 5/7/2024 Well Name:MPU F-66A API Number:50-029-22697-01 Current Status:SI ESP Pad:F-Pad Estimated Start Date:5/15/24 Rig:ASR Reg. Approval Req’d?No Date Reg. Approval Rec’vd:- Regulatory Contact:Tom Fouts Permit to Drill Number:196-162 First Call Engineer:Ryan Lewis (303) 906-5178 Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:Job Type:FCO Current Bottom Hole Pressure:1,890 psi @ 7,297’ TVD ESP Gauge (4/3/24) |4.99 PPGE MPSP:1,160 psi (0.1 psi/ft gas gradient) Max Inclination:77° @ 10,550’ MD Brief Well Summary: MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture stimulation treatment was pumped on the A-sand, however, the job screened out early into the pumping. The well was then completed with an ESP completion without perforating the C-sand. The well has a history of flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500’ MD. The ESP swap operated December 2019 to April 2023. We performed routine flow and scrapes for paraffin in the tubing. 2023 we performed a FCO with coil tubing and the ESP pumps were locked up. Objectives: Pull failed ESP completion, make a scraper run, add Perf, Run new ESP completion. Notes Regarding Wellbore Condition: - 7” casing test to 2,100 psi on 12/16/2019 at 14,810’ MD. Pre-Rig Procedure (Non Sundried Work) Slickline 1. RU slickline, pressure test PCE to 250psi low / 2,500psi high. 2. Drift and tag with sample bailer. 3. Caliper from 18,041’ to surface. 4. Pull DPSOV and set dummy valve in upper GLM at 205’ MD. 5. RIH tubing punch holes at 18,020’ MD 6. RDMO. Pumping & Well Support 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing to 500 barrel returns tank. 6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR arrival. ESP Swap and Perf Add Well: MPU F-66A Date: 5/7/2024 7. RD Little Red Services and reverse out skid. 8. Set BPV. ND tree. NU BOPE. Brief RWO Procedure (Begin Sundried Work) 1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 barrel returns tank. 2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If needed, kill well with produced water prior to setting CTS. 3. Test BOPE to 250 psi low/ 2,500 psi high. Test annular to 250 psi low/ 2,500 psi high (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform test per ASR 1 BOP Test Procedure b. Notify AOGCC 24 hours in advance of BOP test. c. Confirm test pressures per the Sundry conditions of approval. d. Test VBR rams on 2-7/8” test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well with produced water as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 5. Call out Centrilift for ESP pull. 6. RU spoolers to handle ESP cable. 7. MU landing joint or spear, BOLDS, PU on the tubing hanger. a. Tubing hanger is an FMC 7” x 2-7/8” EUE thread. Most likely has 3” LH ACME lift threads. b. 2019 tubing PU weight on Innovation (Block wt 35k) recorded as 112 kip. Slack off weight recorded as 68 kip. c. 2-7/8” L-80 EUE yield is 144 kip. 8. Confirm hanger free, lay down tubing hanger. 9. POOH and lay down the 2-7/8” tubing. a. Confirm with Engineer what tubing to re-use based on caliper results. b. Keep ported discharge head and centralizer for future use. c. Note any sand or scale inside or on the outside of the ESP on the morning report. d. Recorded Clamp Totals: i. Canon Clamps: 282 ii. Flat Guard Clamps = 3 iii. Protectolizers: 3 iv. SS Superbands = 3 10. Lay Down ESP. 11. RU slickline, pressure test PCE to 250psi low / 2,500psi high. 12. Drift run to 18,600’. 13. POOH. RD SL. 14. If you stack out high make the string mill run in step 15. If the drift run is clean go right in to perforating step 17. 15. PU 2-7/8” workstring, 7”spiral string mill, and junk mill. RIH to 18,630’ MD. This will allow us to rotate if needed. ESP Swap and Perf Add Well: MPU F-66A Date: 5/7/2024 16. POOH while filling hole with 2x displacement. 17. RU Eline, pressure test lube to 250 psi low and 2500 psi high. RU with a grease head on top of a pump and sub with a 4.5” x 7” Otis crossover to stab onto the spool piece on BOPs. 18. RIH to perforate. 18,370’ – 18,422’ MD 18,545’ – 18,580’ MD 19. Tie-in with the GR/CCL and send to Geologist & OE for correlation: Graham Emerson, graham.emerson@hilcorp.com, 907-793-0315 and Ryan Lewis 303-906-5178. 20. Perforate and POOH. Repeat until entire interval is perforated. RDMO Eline. 21. RIH with new 2-7/8” 6.5# L-80 ESP completion to +/- 18,106’ and obtain string weights. a. Check electrical continuity every 1000’. b. Note PU and SO weights on tally. c. Install ESP clamps per Baker, and cross coupling clamps every other joint. Nom. Size Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 ~18,100’ 4.5 2 Intake Sensor 30 5.62 34 Motor - 100HP 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 25 GNPSHL 45 5.38 57 Pumps – Flex7 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 17,730 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8" 10 Space out pup 6.5 L-80 2-7/8" 30 Tubing Hanger with full joint 6.5 L-80 22. Land tubing hanger. Use extra caution to not damage cable. 23. Lay down landing joint. 24. Set BPV. 25. RDMO ASR. Post-Rig Procedure: Well Support 1. RD mud boat. RD BOPE house. Move to next well location. These perforation footages are correct, per Ryan Lewis, 5/13/2024. SFD ESP Swap and Perf Add Well: MPU F-66A Date: 5/7/2024 2. RU crane. ND BOPE, set CTS plug, and NU tree. 3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS andBPV. 4. RD crane. Move 500 bbl returns tank and rig mats to next well location. 5. RU well house and flowlines. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOPE Schematic _____________________________________________________________________________________ Revised By TDF 1/7/2020 SCHEMATIC Milne Point Unit Well: MPU F-66A Last Completed: 12/21/2020 PTD: 196-162 TD =18,823’ (MD) / TD = 7,793’(TVD) 20” Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E) DF to Csg Tbg. Spool = 28.50’ (N 22E) 7” 6&7 8 9 9-5/8” 1 TOC Estimate: 13,579’ -14,784’ MD PBTD =18,718’ (MD) / PBTD = 7,719’(TVD) 2 9 KUP A Sands 3 & 4 5 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758 7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 18,106’ 0.00579 JEWELRY DETAIL No Depth Item 1 205’GLM STA# 1: 1" KBMM W/ Screen Orifice 2 18,041.6 Discharge Head: 400 - B/O 3 18,042’ Pump 2: 400PMSXD 141 - P6 4 18,058’ Pump 1: 400PMSSD 196 - P6 5 18,077’ Gas Separator: 538GRS FER N AR 6 18,080’ Upper Tandem Seal: GSB3DB H6 SB/AB PF SA 7 18,087’ Lower Tandem Seal: GSB3DB H6 SB/AB PF SA 8 18,094’ Motor: 562XP – 100Hp/ 1,802V/ 34A 9 18,102’ XT-150 PheonixSensor w/ Centralizer: Bottom @ 18,106’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A Sands 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open 18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4” OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24” Hole 9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole 7” 250 sx Class ‘G’ in a 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’ Hole Angle through perf interval = 47° TREE & WELLHEAD Tree 2-9/16” 5M CIW Wellhead 11” x 7” FMC Gen 5A 5M Double Actuated Gen 5 Wellhead GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E - 10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation – 12/21/2019 STIMULATION SUMMARY 10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe. _____________________________________________________________________________________ Revised By TDF 4/8/2020 PROPOSED Milne Point Unit Well: MPU F-66A Last Completed: 12/21/2020 PTD: 196-162 TD =18,823’ (MD) / TD = 7,793’(TVD) 20” Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E) DF to Csg Tbg. Spool = 28.50’ (N 22E) 7” 2 8 & 9 10 9 9-5/8” 1 TOC Estimate: 13,579’ -14,784’ MD PBTD =18,718’ (MD) / PBTD = 7,719’(TVD) 3 11 KUP A Sands 4 & 5 6 & 7 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758 7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface ±18,100’ 0.00579 JEWELRY DETAIL No Depth Item 1 ±200’STA# 1: 2-7/8" x 1" GLM, 1/4" OV 2 ±XX,XXX’ XN-nipple 2.313" / 2.205" No-Go 3 ±XX,XXX’ Ported Discharge Head: 4 ±XX,XXX’ Pump 2: 5 ±XX,XXX’ Pump 1: 6 ±XX,XXX’ GNPSHL: 7 ±XX,XXX’ Gas Separator: 8 ±XX,XXX’ Upper Tandem Seal: 9 ±XX,XXX’ Lower Tandem Seal: 10 ±XX,XXX’ Motor: 100Hp 11 ±XX,XXX’ Sensor w/ Centralizer: Bottom @ ±18,100’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A Sands ±18,370’ ±18,422’ ±7,497 ±7,533 ±52 Future Future 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open ±18,442’ ±18,488’ ±7,527’ ±7,559’ ±46 Future Future 18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open ±18,500’ ±18,545’ ±7,567’ ±7,598’ ±45 Future Future Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4” OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24” Hole 9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole 7” 250 sx Class ‘G’ in a 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’ Hole Angle through perf interval = 47° TREE & WELLHEAD Tree 2-9/16” 5M CIW Wellhead 11” x 7” FMC Gen 5A 5M Double Actuated Gen 5 Wellhead GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E - 10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation – 12/21/2019 STIMULATION SUMMARY 10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe. These proposed perforation footages should be 18,545' to 18,580' MD. SFD Not proposed SFD Milne Point ASR Rig 1 BOPE 2023 11” BOPE 4.48' 4.54' 2.00' CIW-U 4.30' Hydril GK 11" - 5000 VBR or Pipe Rams Blind11'’- 5000 DSA, 11 5M X 7 1/16 5M (If Needed) 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManualHCR Stripping Head 2-7/8” x 5” VBR 1 Davies, Stephen F (OGC) From:Ryan Lewis <ryan.lewis@hilcorp.com> Sent:Monday, May 13, 2024 10:18 AM To:Davies, Stephen F (OGC) Cc:Graham Emerson; Dewhurst, Andrew D (OGC) Subject:RE: [EXTERNAL] MPU F-66A (Permit 196-162, Sundry 324-280) - Question I apologize, I don’t know how I missed that in the schema c. Step 18 from the “Brief RWO Procedure” is correct. Thanks, RL From: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Sent: Monday, May 13, 2024 9:43 AM To: Ryan Lewis <ryan.lewis@hilcorp.com> Cc: Graham Emerson <Graham.emerson@hilcorp.com>; Dewhurst, Andrew D (OGC) <andrew.dewhurst@alaska.gov> Subject: [EXTERNAL] MPU F-66A (Permit 196-162, Sundry 324-280) - Question Ryan, For consistency: In Sundry Applica on 324-280 for MPU F-66A, the perfora on footages shown on the Proposed Wellbore Schema c drawing do not match those listed in Step 18 of the Brief RWO Procedure. Which are correct? From the Proposed Wellbore Schema c drawing: From the “Brief RWO Procedure” sec on: CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. 2 Thanks and Be Well, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any a achments, contains informa on from the Alaska Oil and Gas Conserva on Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain con den al and/or privileged informa on. The unauthorized review, use or disclosure of such informa on may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without rst saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 18,823'N/A Casing Collapse Conductor N/A Surface 3,090psi Production 5,410psi Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16.Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Wells Manager Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng N/A and N/A N/A and N/A Ryan Lewis ryan.lewis@hilcorp.com 303-906-5178 Perforation Depth MD (ft): See Schematic See Schematic 2-7/8" 112' 20" 9-5/8" 7" 8,223' 18,799' MD N/A 5,750psi 7,240psi 4,506' 7,776' 8,223' 18,799' Length Size Proposed Pools: 112' 112' 6.5# / L-80 / EUE 8rd TVD Burst 18,106' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018 196-162 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22697-01-00 Hilcorp Alaska LLC C.O. 432E1160 AOGCC USE ONLY Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): 5/19/2024 Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY MILNE PT UNIT F-66A MILNE POINT KUPARUK RIVER OIL N/A 7,793' 18,718' 7,719' 1,160 N/A No Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:36 am, Apr 19, 2024 Digitally signed by Taylor Wellman (2143) DN: cn=Taylor Wellman (2143) Date: 2024.04.19 08:25:38 - 08'00' Taylor Wellman (2143) 324-226 10-404 SFD * BOPE test to 2500 psi. * Eline perforating with PCE as described. MGR19APR24 SFD 4/22/2024 Perforate 1,160 DSR-4/23/24*&: Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.04.25 14:29:46 -08'00'04/25/24 RBDMS JSB 042624 ESP Swap and Perf Add Well: MPU F-66A Date: 4/3/2024 Well Name:MPU F-66A API Number:50-029-22697-01 Current Status:SI ESP Pad:F-Pad Estimated Start Date:5/19/24 Rig:ASR Reg. Approval Req’d?No Date Reg. Approval Rec’vd:- Regulatory Contact:Tom Fouts Permit to Drill Number:196-162 First Call Engineer:Ryan Lewis (303) 906-5178 Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M) AFE Number:Job Type:FCO Current Bottom Hole Pressure:1,890 psi @ 7,297’ TVD ESP Gauge (4/3/24) |4.99 PPGE MPSP:1,160 psi (0.1 psi/ft gas gradient) Max Inclination: 77° @ 10,550’ MD Brief Well Summary: MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture stimulation treatment was pumped on the A-sand, however, the job screened out early into the pumping. The well was then completed with an ESP completion without perforating the C-sand. The well has a history of flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500’ MD. The ESP swap operated December 2019 to April 2023. We performed routine flow and scrapes for paraffin in the tubing. 2023 we performed a FCO with coil tubing and the ESP pumps were locked up. Objectives: Pull failed ESP completion, make a scraper run, add Perf, Run new ESP completion. Notes Regarding Wellbore Condition: - 7” casing test to 2,100 psi on 12/16/2019 at 14,810’ MD. Pre-Rig Procedure (Non Sundried Work) Slickline 1. RU slickline, pressure test PCE to 250psi low / 2,500psi high. 2. Drift and tag with sample bailer. 3. Caliper from 18,041’ to surface. 4. Pull DPSOV and set dummy valve in upper GLM at 205’ MD. 5. RIH tubing punch holes at 18,020’ MD 6. RDMO. Pumping & Well Support 1. Clear and level pad area in front of well. Spot rig mats and containment. 2. RD well house and flowlines. Clear and level area around well. 3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank. 4. Pressure test lines to 3,000 psi. 5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing to 500 barrel returns tank. 6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR arrival. add Perf ESP Swap and Perf Add Well: MPU F-66A Date: 4/3/2024 7. RD Little Red Services and reverse out skid. 8. Set BPV. ND tree. NU BOPE. Brief RWO Procedure (Begin Sundried Work) 1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 barrel returns tank. 2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing and casing. a. If needed, kill well with produced water prior to setting CTS. 3. Test BOPE to 250 psi low/ 2,500 psi high. Test annular to 250 psi low/ 2,500 psi high (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. a. Perform test per ASR 1 BOP Test Procedure b. Notify AOGCC 24 hours in advance of BOP test. c. Confirm test pressures per the Sundry conditions of approval. d. Test VBR rams on 2-7/8” test joint. e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the returns tank. Kill well with produced water as needed. Pull BPV. a. If indications show pressure underneath BPV, lubricate out BPV. 5. Call out Centrilift for ESP pull. 6. RU spoolers to handle ESP cable. 7. MU landing joint or spear, BOLDS, PU on the tubing hanger. a. Tubing hanger is an FMC 7” x 2-7/8” EUE thread. Most likely has 3” LH ACME lift threads. b. 2019 tubing PU weight on Innovation (Block wt 35k) recorded as 112 kip. Slack off weight recorded as 68 kip. c. 2-7/8” L-80 EUE yield is 144 kip. 8. Confirm hanger free, lay down tubing hanger. 9. POOH and lay down the 2-7/8” tubing. a. Confirm with Engineer what tubing to re-use based on caliper results. b. Keep ported discharge head and centralizer for future use. c. Note any sand or scale inside or on the outside of the ESP on the morning report. d. Recorded Clamp Totals: i. Canon Clamps: 282 ii. Flat Guard Clamps = 3 iii. Protectolizers: 3 iv. SS Superbands = 3 10. Lay Down ESP. 11. PU 2-7/8” workstring, 7” spiral string mill, and junk mill. RIH to 18,630’ MD. This will allow us to rotate if needed. 12. POOH while filling hole with 2x displacement. 13. RU Eline, pressure test lube to 250 psi low and 2500 psi high. RU with a grease head on top of a pump and sub with a 4.5” x 7” Otis crossover to stab onto the spool piece on BOPs. ESP Swap and Perf Add Well: MPU F-66A Date: 4/3/2024 14. RIH to perforate. 18,370’ – 18,422’ MD 18,545’ – 18,580’ MD 15. Tie-in with the GR/CCL and send to Geologist & OE for correlation: Graham Emerson, graham.emerson@hilcorp.com, 907-793-0315 and Ryan Lewis 303-906-5178. 16. Perforate and POOH. Repeat until entire interval is perforated. RDMO Eline. 17. RIH with new 2-7/8” 6.5# L-80 ESP completion to +/- 18,106’ and obtain string weights. a. Check electrical continuity every 1000’. b. Note PU and SO weights on tally. c. Install ESP clamps per Baker, and cross coupling clamps every other joint. Nom. Size Length Item Lb/ft Material Notes 5.85 2 Centralizer 4 ~18,100’ 4.5 2 Intake Sensor 30 5.62 34 Motor - 100HP 80 5.2 7 Lower Tandem Seal 38 5.2 7 Upper Tandem Seal 38 5.2 8 Gas Separator 52 5.38 25 GNPSHL 45 5.38 57 Pumps – Flex7 45 1 Ported Discharge Head 13 L-80 2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 17,730 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD 2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80 2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80 2-7/8" 10 Space out pup 6.5 L-80 2-7/8" 30 Tubing Hanger with full joint 6.5 L-80 18. Land tubing hanger. Use extra caution to not damage cable. 19. Lay down landing joint. 20. Set BPV. 21. RDMO ASR. Post-Rig Procedure: Well Support 1. RD mud boat. RD BOPE house. Move to next well location. 2. RU crane. ND BOPE, set CTS plug, and NU tree. 3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV. 18,370’ – 18,422’ MD 18,545’ – 18,580’ MD ESP Swap and Perf Add Well: MPU F-66A Date: 4/3/2024 4. RD crane. Move 500 bbl returns tank and rig mats to next well location. 5. RU well house and flowlines. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOPE Schematic _____________________________________________________________________________________ Revised By TDF 1/7/2020 SCHEMATIC Milne Point Unit Well: MPU F-66A Last Completed: 12/21/2020 PTD: 196-162 TD =18,823’ (MD) / TD = 7,793’(TVD) 20” Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E) DF to Csg Tbg. Spool = 28.50’ (N 22E) 7” 6&7 8 9 9-5/8” 1 TOC Estimate: 13,579’ -14,784’ MD PBTD = 18,718’ (MD) / PBTD = 7,719’(TVD) 2 9 KUP A Sands 3 & 4 5 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758 7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 18,106’ 0.00579 JEWELRY DETAIL No Depth Item 1 205’GLM STA# 1: 1" KBMM W/ Screen Orifice 2 18,041.6 Discharge Head: 400 - B/O 3 18,042’ Pump 2: 400PMSXD 141 - P6 4 18,058’ Pump 1: 400PMSSD 196 - P6 5 18,077’ Gas Separator: 538GRS FER N AR 6 18,080’ Upper Tandem Seal: GSB3DB H6 SB/AB PF SA 7 18,087’ Lower Tandem Seal: GSB3DB H6 SB/AB PF SA 8 18,094’ Motor: 562XP – 100Hp/ 1,802V/ 34A 9 18,102’ XT-150 PheonixSensor w/ Centralizer: Bottom @ 18,106’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A Sands 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open 18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4” OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24” Hole 9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole 7” 250 sx Class ‘G’ in a 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’ Hole Angle through perf interval = 47° TREE & WELLHEAD Tree 2-9/16” 5M CIW Wellhead 11” x 7” FMC Gen 5A 5M Double Actuated Gen 5 Wellhead GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E - 10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation – 12/21/2019 STIMULATION SUMMARY 10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe. _____________________________________________________________________________________ Revised By TDF 4/8/2020 PROPOSED Milne Point Unit Well: MPU F-66A Last Completed: 12/21/2020 PTD: 196-162 TD =18,823’ (MD) / TD = 7,793’(TVD) 20” Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E) DF to Csg Tbg. Spool = 28.50’ (N 22E) 7” 2 8 & 9 10 9 9-5/8” 1 TOC Estimate: 13,579’ -14,784’ MD PBTD =18,718’ (MD) / PBTD = 7,719’(TVD) 3 11 KUP A Sands 4 & 5 6 & 7 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm BPF 20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758 7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface ±18,100’ 0.00579 JEWELRY DETAIL No Depth Item 1 ±200’STA# 1: 2-7/8" x 1" GLM, 1/4" OV 2 ±XX,XXX’ XN-nipple 2.313" / 2.205" No-Go 3 ±XX,XXX’ Ported Discharge Head: 4 ±XX,XXX’ Pump 2: 5 ±XX,XXX’ Pump 1: 6 ±XX,XXX’ GNPSHL: 7 ±XX,XXX’ Gas Separator: 8 ±XX,XXX’ Upper Tandem Seal: 9 ±XX,XXX’ Lower Tandem Seal: 10 ±XX,XXX’ Motor: 100Hp 11 ±XX,XXX’ Sensor w/ Centralizer: Bottom @ ±18,100’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup. A Sands ±18,370’ ±18,422’ ±7,497 ±7,533 ±52 Future Future 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open ±18,442’ ±18,488’ ±7,527’ ±7,559’ ±46 Future Future 18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open ±18,500’ ±18,545’ ±7,567’ ±7,598’ ±45 Future Future Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4” OPEN HOLE / CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24” Hole 9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole 7” 250 sx Class ‘G’ in a 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’ Hole Angle through perf interval = 47° TREE & WELLHEAD Tree 2-9/16” 5M CIW Wellhead 11” x 7” FMC Gen 5A 5M Double Actuated Gen 5 Wellhead GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E - 10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation – 12/21/2019 STIMULATION SUMMARY 10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe. Milne Point ASR Rig 1 BOPE 2023 11” BOPE 4.48' 4.54' 2.00' CIW-U 4.30' Hydril GK 11" - 5000 VBR or Pipe Rams Blind11'’- 5000 DSA, 11 5M X 7 1/16 5M (If Needed) 2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves HCRManualManualHCR Stripping Head 2-7/8” x 5” VBR Samuel Gebert Hilcorp Alaska, LLC GeoTech Assistant 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 09/15/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU F-66A (196-162) Multi Finger Caliper Log 12/09/2019 ANALYSIS FIELD DATA Please include current contact information if different from above. Received by the AOGCC 09/16/2020 PTD: 1961620 E-Set: 33893 Abby Bell 09/16/2020 P !V STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 7 , 2020 REPORT OF SUNDRY WELL OPERATIONS ��Trr 1. Operations Abandon L1 Plug Perforations Ll Fracture StimulateLJ Pull Tubing Lzl ra own Performed: Suspend ❑ Perforate ❑ Other Stimulate❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ arforate New Pool ❑ Repair Well❑ Re-enter Susp Well ❑ Other: ESP Change -out Q 2. Operator Name: Hilcorp Alaska LLC 4. Well Class Before Work: 5. Permit to Drill Number: M t `i 0457 Development ✓ P ❑ Stratigraphic❑ Ex lorato P N ❑ Service ❑ 196-162 .�� 3. Address: 3800Centerpoint Dr, Suite 1400 Anchorage, / „� 6. API Number:AK 99503 50-029-22697-01-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018 MILNE PT UNIT F -66A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A MILNE POINT / KUPARUK RIVER OIL 11. Present Well Condition Summary: Total Depth measured 18,823 feet Plugs measured N/A feet true vertical 7,793 feet Junk measured N/A feet Effective Depth measured 18,718 feet Packer measured N/A feet true vertical 7,719 feet true vertical N/A feet Casing Length Size MD TVD Burst Collapse Conductor 112' 20" 112' 112' N/A N/A Surface 8,223' 9-5/8" 8,223' 4,506' 5,750psi 3,090psi Production 18,799' 7" 18,799' 7,776' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.5# / L-80 / EUE 8rd 18,106' 7,299' Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 1 0 0 1 0 400 0 Subsequent to operation: 1213 16 1 35 420 378 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations ❑ Exploratory❑ Development ❑✓ Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ✓ Gas WDSPL Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-538 Authorized Name: Chad Helgeson ' "'"7Ay" Contact Name: Ian Toomey-P� Authorized Title: Operations Manager Contact Email: itoonneyQhkorD.Conn Authorized Signature: Date 1/21/2020 Contact Phone: 777-8434 4ev ZOO(/,�?��OdO JAN 2 3 2020 Form 10-404 Revised 4/2017 Submit Original Only Milne Point Unit SCHEMATIC Well: MPU F -66A Last Completed: 12/21/2020 Hilcom Alaska, LLC PTD: 196-162 Ori& DF Elev.: 415'/ Gl. Elev.:12.4' (N22E) DF to C59 ft Spool =28.50' IN 22E) To= 18,823! (MD) /TD =7,793'(TVD) PBTD=18,719 (MD) / PBTD= 7,719'MD) TREE & WELLHEAD Tree 2-9/16" SM CI W Wellhead 11"x7" FMC Gen 5A 5M Double 7" Actuated Gen 5 Wellhead OPEN HOLE/ CEMENT DETAIL 20" 250 sx of Arcticset I (A rox) in a 24" Hole 9-5/8" 1,675 sx PF 'E' & 700 sx Class'G' in a 12 -1/4" 7" -Hole 1 250 sx Class 'G' in a 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID Top Btm BPF 20" Conductor 91.1/H-40/N/A I N/A I Surface 112' 0.3553 9-5/8" Surface40 / L-80 / BTRC & BTC 8.835 Surface 18,080' 0.0758 7" Production 26/L-80/BTC MOD 6.276 Surface 18 %,' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/ L-80 / EUE 8rd 2.441 I Surface ±1g,106' 0.00579 WELL INCLINATION DETAIL MP @ 500' Max Hole Angle = 75° to 76° f/ 8,400' —16,800' Hole Angle through perf interval = 47' STIMULATION SUMMARY 10/23/96-53 M lbs. 16/20 Carbolite behind pipe. JEWELRY DETAIL No Depth Item 1 205' GLM STA#1:1"KBMM W/Screen Orifice 2 18,041.6 Discharge Head: 400-B/O 3 18,042' Pump 2: 40OPMSXD 141- P6 4 18,058' Pump 1: 40OPMSSD 196-P6 5 18,077' Gas Separator: 538GRS FER N AR 6 18,080' Upper Tandem Seal: GSB3DB H6 SB/AB PF SA 7 18,087' Lower Tandem Seal: GSB3DB H6 SB/AB PF SA 8 18,094' Motor: 562XP— 100H p/ 1,802V/ 34A 9 18,102' XT -150 Pheonix5ensor w/ Centralizer: Bottom @ 18,106' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (ND) 8tm (ND) FT Date Status Kup.ASands 18'442 18'488 7,527' 7,559' 46 10/10/1996 Open 18,500' 18,545' 7,567' 7,598' 45 10/10/1996 Open Ref Log: 10/9/96 GR/CCL —22gm. Atlas 3-3/8" lumbo Jet Charges 6SPF @ b0° Phasing n — EHD=0.76"/ TTP=6.4" GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E -10/4/1996 ESP Completion by Nabors 4ES 11/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWO ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 RWO ESP by Innovation -12/21/2019 Revised By TDF 1/7/2020 Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F -66A Innovation 50-029-22697-00-00 196-162 12/12/2019 12/21/2019 12/11/2019 - Wednesday No operations to report. 12/12/2019 -Thursday Prep modules for rig move. Jack up mods. Peak on location @ 08:00 hrs. Move off well F-37 and stage all rig mods on location. Finish laying mats. Spot sub over F-66. Set catwalk, pipeshed, pits and gen mod. Hook up innerconnect svc lines between modules. Sent notification to AOGCC for upcoming BOP test. PJSM Scope up Derrick. Bridle down and store lines. Work on rig acceptance checklist. Put MP #1 back together. Troubleshoot crown light plug in at Derrick Board. PJSM Rig up Pit Mod interconnects. Cont working on rig acceptance checklist. Function test Top Drive. Cont. working on MP #1. Take on 580 bbls 8.3 ppg source water at 22:00. Rig up lines in Cellar for well kill. 460psi observed on IA at 23:30. R/U small bleed tank and start bleeding off IA. Perform post rig move Derrick inspection and grease Crown. Function test Mud Pumps through bleeder. Rig accepted at 00:00. PJSM Cont.bleeding down IA to small bleed tank. Stage and R/U flow back tank to IA. Cont. bleeding down IA to flow back tank. SIMOPS Attempt to Pressure test stand pipe and Top Drive. Suspected ice plug. Work on thawing out stand pipe and Kelly Hose. Take on another 290 bbls 8.3 ppg source water. PJSM IA Press Opsi, OA 140psi. R/D flow back lines and R/U IA to Kill Line. Pump 10 bbls down IA. Shut in and test kill lines to 2,500psi. Bullhead 95° F 8.3 ppg source water at 2 bpm ICP 30psi. Stage pumps up to 4 bpm caught Press at 182 bbls away. OA Press at 840psi. Reduced pumps to 2 bpm W/ Press limiter set at 1,300psi. OA Press 880psi at 240 bbls away. Cont bullheading at 2 bpm staging Press limiter up to 1,800psi injecting at 1.25 bpm OA 920psi at 375 bbls away. Cont working on thawing stand pipe and Kelly Hose. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig I API Number Well Permit Number StartDate End Date MP F-66A Innovation 1 50-029-22697-00-00 196-162 12/12/2019 12/21/2019 12/13/2019 - Friday Continue bullheading down IA (7" x 2-7/8") staging up to max 2 bpm, withpsi climbing to 2,500psi. Monitor OA throughout w/ startingpsi 460 and 1250 maxpsi. Back pump rate down to 1.5 bpm, 2,OOOpsi to reduce OApsi to 980. Pump 520 bbls heated 8.3 ppg Source water. Shut down and monitor well. Initial shutpsi 1700 on IA, 950psi OA. IA dropped to Opsi over 20 mins, OA dropped to 630 and stabilized. Attempt to pull BPV to reverse circulate, hadpsi underneath. R/U and bullhead 104 bbls 8.3 ppg heated source water (80° F) down 2-7/8" tbg staging up to 3 bpm whilepsi continually climbed to maxpsi pump set point @ 2,500psi. Pump rate reduced to 2 bpm maintaining 2,500psi. Shut down, monitored well -tbg 2,200psi to zero over 20 mins and IA dropped to 250psi. Bled back 5 bbls and shut IA withpsi @ 75. OA dropped from 850psi to 600-620psi then stabilized over 20 mins. Open IA to flowback tank with a total of 10 bbls heated source water / crude oil / gas bled back then went static. Pull BPV and install TWC. Tbg on vac. N/D tree. Install XO to verify threads (left hand acme 8.5 turns). N/U 13-5/8" 5M BOP's on 7-1/16" 5M tubing head w/ 7-1/16" x 13-5/8" DSA. 2-7/8" x 5-1/2" VBRs UPR's and LPR's. Blinds in middle gate. N/U kill, choke lines and 4 pt stack, center same. PJSM Obtain RKB measurements. Install X/O and test sub on Top Drive. M/U X/O to side entry sub, 4" TIW, 4" Dart to 2 7/8" test jnt W/ donut. Flood Choke, Stack and Kill W/ H2O. Shell test to 2,500psi. Test H2S 10-20 ppm, LEL 20-40%, PVT high/ low level alarms. PJSM BOPE Test 250psi low 2,500psi high 5 min on chart. Test 2.875" X 5.5" VRB Upper and Lower, upper and lower IBOP, 4" Dart, 4" TIW, Annular, CMV 7-13 & 15, Mezz Kill, Manual Kill. Trouble shoot leak and found HCR Kill leaking. Monitor IA W/ Bleed Tank, seeing slight Gas, stopped at 00:00. PJSM Found Ram door seal leaking, tightened bolts. Retested 2.875" CMV 7-10, Upper Rams (P/F) & Manual Kill. Pull 2 7/8" Test Joint. Test Blinds and CMV 1-3 & 14. Koomey draw drown Initial System 2,950psi, Manifold 1,550psi, Annular 1,450psi, after System 1,450psi, Man 1,400psi, Annular 1,450psi. 200psi increase 26 Sec, full charge 100 sec. Nitrogen 6 bottle average 2,325psi. R/U 4" testjoint. Fix high Press hose fitting and 1502 0 Ring on pump in sub. Test W/ 4" test Joint, 2.875" X 5.5" VRB Upper and Lower, Annular, HCR Choke, Manual Choke (F/P). Bleed air out of Choke Manifold for Super Choke test. SIMOPS Move flow back tank and spot Spooling Unit. 12/14/2019-Saturday Continue testing BOP's 250/2,500psi w/ 5 min hold on each. Witnessed by AOGCC rep Guv Cook. Attempt to test super choke and manual choke. Failed first attempt but passed after flushing thru chokes and re-testing. Rebuild HCR kill (washed seat) and re-test. Failed test, rebuild a second time and re-test with same results. R/D and B/D kill. Replaced HCR kill and re- test (passed). Test surface lines 2,500psi (ok). PJSM, Blowdown choke. R/U on I/A to poor boy degasser. Monitor I/A while rigging down and vac out stack to remove TWC (debris in profile). I/A no fluid with slight gas venting initially then static. Finish rigging up Weatherford casing equipment and function test same. Flush top of BPV profile to remove obstruction/debris from retrieval profile. Bring Centrilift tools to rig floor and stage same. Used a solid puller for TWC. Found a piece of rubber and compressed scale in TWC. Set BPV due to bails not long enough for TIW. P1SM Monitor IA W/ 1" hose in 5 gallon bucket with water. Very slight Gas. P/U 2 7/8" Landing Jnt and M/U X/0 to 3" left hand ACME. Screw into Hanger and BOLDS. Unseat Hanger W/ 104K. Pumped 40 bbls Source Water down hole, monitor well W/ hand held gas meter. Observed intermittent max 20% LEL during pumping. Shut down pumps and no Gas detected. Shut in Annular and monitor well for 10 min, no Press seen. Tubing string broke over at 144K to 135K P/U. Terminate ESP and L/D Hanger. POOH 2.875" 6.5# L-80 EUE and ESP cable as per tally kicking out bad jnts as per plan F/ 18,086' to 17,496' M D. Once enough ESP cable was pulled attach cable to Spooler drum. Filling hole W/ 10 bph 8.4 ppg source water. PJSM POOH 2.875" 6.5# L-80 EUE and ESP cable as per tally racking back stands and kicking out bad jnts as per plan F/ 17,496' to 12,487' MD. P/U 97K, SLK 49K Strapping stands in Derrick. Filling hole W/ 12 bph 8.4 ppg source water. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F -66A Innovation 50-029-22697-00-00 196-162 12/12/2019 12/21/2019 12/15/2019 -Sunday PJSM, POOH 2.875" 6.5# L-80 EUE ESP completion as per tally rack back stds and L/D bad jnts as per plan F/ 12,487'to 6,980' MD. P/U 74K, S/O 46K. Strap stands in derrick. Fill hole W/ 10 bph 8.4 ppg source water until 08:30 hrs then increase to 35 bph to help minimize any swab potential caused from passible packing off around ESP assy. Continue POOH 2.875" 6.5# L-80 EUE ESP completion as per tally rack back stds and L/D bad jnts as per plan F/ 6,980' to 5,594' MD. P/U 65K, S/0 52K. Strap stands in derrick. Fill hole W/ 35 bph 8.4 ppg source water/ no returns. Post BOP report emailed to AOGCC. Continue POOH laying down 2.875" ESP completion as per plan F/ 5,594'to 5,266' MD. P/U 65K, S/0 52K. Fill hole W/ 35 bph 8.4 ppg source water/ no returns. Saw flow out top of tubing (oil/diesel/source water). Stab valve and Kelly up. Stage up to 3 bpm, 330psi. Saw return flow after 18 bbls. Staged up to max rate 7.4 bpm, 1785psi. Saw gas start breaking out @ btms up along with oil/diesel mixed with source water. MW out 8.2 ppg. No pit gain. Shut down and monitored well (dropping @ —25-30 gph static loss rate). Worked pipe while watching fluid, did not see any swabbing indicating packoff around assy. B/D TDS. Lineup on TT. Continue POOH laying down 2.875" ESP completion as per plan F/ 5,266' to 4,000' MD. P/U 65K, S/0 52K. Fill hole W/ 35 bph 8.4 ppg source water (34 bbl loss for this time log trip interval). PJSM Cont POOH L/D 2.875" Tubing W/ ESP F/ 4,000' to 74' MD. P/U 39K, SLK 39K Calc Disp 10 bbls, actual 155 bbls, lost 145 bbls. Static loss rate 20-25 bph. Break out AVA Ported Nipple. Change ESP Cable to MT spool at 2,889' MD. Pulled at total of 570 Jnts,. PJSM L/D Handing pup jnt, Remove 2.875" Elevators and put wire rope sling thru Bails. P/U and drain lube oil F/ pump and L/D pump. PJSM L/D Upper and lower Tandem Seals, Motor and Centralizers. Light scale seen around pump housing. Motor oil was burnt and 2' section motor lead damaged W/ no armor. Appears to have been damaged by the Gas Separator. Final Lasalle clamp count 488 ea, Protectilizers 5 ea, Flat Guard 3 ea. 380 good 2.875" jnts, 190 bad jnts 2.875" jnts. PJSM Clean and clear rig floor. R/D Weatherford Power Tongs. Spool up ESP cable F/ rig floor to Spooler. L/D all Baker Centrilift tools. Unload 2.875" Tubing F/ Pipe Shed. Load 43 Jnts 4" D.P. & TST 3 Packer in Pipe Shed. Load rig floor W/ 4-3/4" Oil Jars, 4-3/4" Bumper Sub and X/O's. Static loss 17 BPH. M/U Mouse Hole,. PJSM Grease Crown, Blocks, Top Drive, Wash Pipe, Spinners and Drawworks. Check oil in Top Drive. PJSM P/U M/U 6.125" Bit (15 X 3 Jets), 7" Scraper and 4" D.P. 14# S-135 HT 38 as per Baker. Static loss rate 17 bbls. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MP F -66A Innovation 50-029-22697-00-00 196-162 12/12/2019 1 12/21/2019 12/16/2019 - Monday Cont. P/U M/U X/O (1.36'), TST 3 Packer (15.08'), 4-3/4" Bumper Sub (7.54'), 4-3/4" Oil Jars (11.08'), X/O (1.66') Total length BHA 74.24' as per Baker Rep. RIH W/ Scraper and TST 3 Packer Assy single in hole 4" 14# S-135 F/ Pipe Shed F/ 74' to 9,019' MD.P/U 123K, SLK 74K. Well started "U" Tubing shut down hole fill. Fill 8-10 bph 8.4 ppg Source Water. Service traveling equipment and skate. C/O hydraulic hose on skate. PJSM RIH W/ Scraper and TST 3 Packer Assy single in hole 4" 14# S-135 F/ Pipe Shed F/ 9,019' to 14,895' MD.P/U 171K, SLK 77K. L/D single Bit depth 14,855' MD. Fill 8 bph 8.4 ppg Source Water. PJSM Rotate left hand turns working down 10 turns in 2 turn increments max trq 7K P/U 171K, SLK 77K. Set TST 3 at 14,810', Bit depth 14,855' MD. Set down 25K to confirm Packer set. Fill hole W/ 28 bbls 8.4 ppg Source Water. Flood Choke and Kill lines. Close Upper 2 7/8" X 5" VRBS. R/U test Equip. PJSM Cont. R/U test Equip. Test 7" Csg to 2,100psi for 30 Min on chart. Pumped 3.5 bbls, bled back 3.4 bbls. R/D and blow down test Equip. PJSM Rotate 9 right hand turns while P/U slowly. Max TRQ set 10K. Slack off weight 81K and verify TST 3 Packer was released. Once Packer seals disengaged W/ hole fill pump on took 19 bbls to get returns. Break out of string and bleed air out of TIW. Kelly back up to string. PJSM Surf to Surf. Break Circ W/ 8.4 ppg 100° F Source Water and Condit at 4 bpm 660psi. About 60 bbls into Circ. Heavy Oil/ Diesel/ Gas was seen. Max Gas 1,4000. Started dumping overboard. Elevated LEL was seen on the rig floor Gas Detector, may have been caused by high winds. Shut down and monitor well, fluid dropping in well. No sign of well control situation. Decision was made to close annular and Cont. Circ through Super Choke and Gas Buster due to Gas breaking out. Cont. pumping at 4 bpm 640psi through Gas Buster dumping Oil/ Diesel/ Gas. Dumped a total of 85 bbls. Cont. Just prior to BU started seeing Oil and slight Gas, dumped 90 bbls. Well cleaned up. Total dumped 175 bbls. Dynamic rate at 28 bph. Shut in Choke and no Press. Open well static loss was observed. Monitor well W/ hole fill pump on 24 bph loss rate. Kelly down, blow down Top Drive, Choke, Kill and Manifold. PJSM POOH L/D 4" D.P. to Pipe Shed F/ 14,855' to 14,700' MD. P/U 144K SLK 94K. Running hole fill pump. 12/17/2019 -Tuesday Cont POOH L/D 4" D.P. to Pipe Shed F/ 14,700' to BHA' MD. Calc Disp 81, actual 290 bbls. Lost 209 bbis. At 3,180' MD fluid was UTubing out of stump. Shut down hole fill for 10 jnts, filling 6 bbis every 10 jnts. Topping off hole every 40 jnts. Dynamic loss rate "'18 bph. PJSM L/D 4-3/4" Oil Jars, 4-3/4" Bumper Sub, TST 3 Packer and 7" Scraper as per Baker Rep onsite. Static loss rate 14-15 bph. PJSM Clean and clear rig floor. Prep Pipe Shed for 2-7/8" Tubing. Service Skate, grease Crown, Blocks, Top Drive and Drawworks. SIMOPS Load 2-7/8" Tubing in Pipe Shed. PJSM Cont. loading and processing 2-7/8" Tubing in Pipe Shed. Bring 314 Cannon Clamps, 616 pins and Baker Job Box to rig floor. Remove Elephant Trunk from ESP Sheave in Derrick. Load ESP Motor Assy in Pipe Shed. Static loss rate 14-15 bph. PJSM P/U M/U 5.95" Cebtralizer, Phoenix XT -150 Gauge Motor, MTR 562XP 100 HP, Lower and upper Tandem Seals, Gas Separator, Pump 400PMSSD, Pump 400PMSSD, Bolt on Discharge Head and 10'2.875 Pup. (Total 74.65') Oil and work out air. M/U Motor Lead and test. Phase to Phase 4.2 ohmz, Phase to Ground 2.86 Gomhz. Press intake, Temp and Motor Temp good. Lower & Upper 2 ea, Separator 1 ea, Pump 1 & 2 4 ea, total 13 specialty clamps. Static loss rate 12-13 bph. PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 75'to 232' MD. Rabbit (2.375" OD) tubing off skate. TRQ to 2,250 ft/Ib. Cannon Clamps as pertally. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig I API Number Well Permit Number Start Date End Date MP F-66A Innovation 1 50-029-22697-00-00 196-162 12/12/2019 12/21/2019 12/18/2019 - Wednesday PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 232' to 7,854' MD. P/U 63K, SLK 59K Rabbit (2.375" OD) tubing off skate. TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Test ESP every 1,000' MD. Calc Disp 23 bbls, actual 92 bbls, lost 114 bbls. PJSM Set TIW and perform ESP splice to new spool. Test Splice, good. Monitor hole W/ hole fill pump static loss rate 13 bph. SIMOPS Remove 4" D.P. F/ pipe Shed. PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 7,854'to 8,991' MD. P/U 74K, SLK 61K. TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Test ESP and found Phase to Phase good ( 7 omhs) Ground to ground, bad. Used two separate meters. Calc Disp 3 bbls, actual 42 bbls, lost 45 bbls. Splice at 8,105' MD. PJSM POOH W/ ESP 2.875" F/ 8,991' to 7,919' MD P/U 76K, SLK 61K Lost 24 bbls. Cut splice and check Reel ESP cable, good. Down hole ESP Ground to ground, bad. Gather Elephant trunk and drain hose for POOH. R/U to POOH. Cut splice and check Reel ESP cable, good. Down hole ESP Ground to ground, bad. Gather Elephant trunk and drain hose for POOH. R/U to POOH. PJSM Rig up to POOH, RIH 2 stands F/ 7,919' to 8,045'MD W/ rope attached to ESP cable to bring back down to rig floor. Attache and rig up Elephant trunk & drain hose to sheave. POOH F/ 8,045' to 7,857' MD pulling ESP Cable and attaching it to spool in Spooler. Static loss rate 12 bph. PJSM POOH racking back 2.875" Tubing W/ ESP F/ 7,857' to 4,789' MD P/U 63K, SLK 53K checking ESP cable for any signs of damage. 12/19/2019 - Thursday PJSM POOH racking back 2.875" Tubing W/ ESP F/ 4,789' to ESP' MD Checking ESP cable for any signs of damage. Adding 12 bph 8.4 ppg Source Water. PJSM L/D Pup/ Discharge Head, both pumps, Gas Separator and Lower and Upp Tandem Seals as per Baker Rep onsite. Found damaged armor on MLE cable on Upper and Lower Tandem Seals. PJSM Lower ESP cable to spooling unit to get new MLE splice put on. Remove Elephant Trunk F/ sheave in Derrick. Clean and clear rig floor. Monitor well on TT, static loss 12 bph. PJSM P/U M/U 5.95" Cebtralizer, Phoenix XT-150 Gauge Motor, MTR 562XP 100 HP, NEW Lower and Upper Tandem Seals, Gas Separator, Pump 400PMSSD, Pump 400PMSSD, Bolt on Discharge Head and 10' 2.875 Pup. (Total 74.65') Oil and work out air. M/U Motor Lead and test. Phase to Phase 4.4 ohms, Phase to Ground 3.1 Giga omhs. Press intake, Temp and Motor Temp good. Motor & Lower & Upper Seal Assy 3 ea Flat Gaurds & 3 ea Carbon Steal Super Bands, Pump 1 & 2 4 ea Specialty Clamps, total 17 on ESP. Static loss rate 12-13 bph. PJSM RIH ESP W/ 2.875" stands F/ the Derrick F/ 75'to 3,300' MD. TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Static loss rate 12 bph. Checking ESP every 1,000' MD. Replacing bad jnt 9 W/jnt 206 galled pin. Calc Disp 7 bbls, actual 43, total loss 50 bbl. PJSM RIH ESP W/ 2.875" stands F/ the Derrick F/ 3,300'to 7,932' MD. P/U 75K, SLK 60K TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Checking ESP every 1,000' MD. Replacing bad jnt 9 W/jnt 206 galled pin. Calc Disp 9 bbls, actual 49, total loss 58 bbl. PJSM Set TIW and make up splice on ESP cable to new reel as per Baker Rep onsite. Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number StartDate End Date MP F -66A Innovation 50-029-22697-00-00 196-162 12/12/2019 12/21/2019 12/20/2019 - Friday PJSM Complete ESP Cable splice to new reel. Splice at 8,108' MD. SIMOPS Perform Derrick inspection, grease Crown, Blocks, Top Drive, Drawworks, Spinners, IBOP and check oil. Replace chain binders on Stack W/ Comalongs. Prep cellar and floorfor upcoming N/D. Check and airtires for rig move. PJSM RIH ESP W/ 2.875" stands F/ the Derrick F/ 7,932'to 15,925' MD. P/U 92K, SLK 62K TRQ to 2,250 ft/Ib. Cannon Clamps as pertally. Checking ESP every 1,000' MD. Replacing bad jnts. Calc Disp 19.4 bbls, actual 142, total loss 162 bbl. PJSM M/U TIW valve. Make ESP splice to new reel as per Baker Rep onsite and test, good. Monitor well on TT, Static loss rate 16 bph. SIMOPS Lay Herculite and Matt Boards on MPU M-26. PJSM Cont ESP W/ 2.875" stands F/ the Derrick F/ 15,925'to 18,068' MD. P/U 112K, SLK 68K TRQ to 2,250 ft/Ib. Cannon Clamps as per tally. Checking ESP every 1,000' MD. Calc Disp 8 bbls, actual 59, total loss 67 bbl. Install GLM 1" KBMM W/ Screen Orifice at 202' MD. Total Cannon Clamps 282 ea. Fait Guard 3 ea, Protectolizer 3 ea, 3 SS Superbands 3 Ea. First ESP Splice at 2,019' MD Second splice at 9,994' MD. Replaced 3 jnts. PJSM Test ESP cable at reel. P/U M/U Hanger and 2.875" landingjoint. Tie off and cut ESP cable at rig floor. M/U Penetrator to ESP and test as per Baker. RIH Land Hanger & RILDS P/U 112K, SLK 68K. Set Depth 18,106' MD. Monitor well on TT. Static loss rate 16 bph. PJSM Remove XO on 2-7/8" Landing Jnt. L/D Mouse Hole. Break down 2-7/8" stand in Derrick. L/D Weatherford tools and Equip. Remove Baker sheave in Derrick. Remove 2-7/8" Tubing F/ Pipe Shed. Clean Pits. Johhny Whack Tree and flush all surface Equip. 12/21/2019 -Saturday PJSM Remove Riser, Choke & Kill Lines, Bell Nipple. remove chains and set BOP on pedestal. Remove DSA. SIMOPS Remove all 4" and 2.875" tools and Eqiup F/ rig floor. Cont. flushing and cleaning pits. PJSM Clean up Hanger void and perform final conductivity test on ESP, good. Install TWC and N/U Tree. Test void to 500 PSI low 5 min and 5,000 PSI high 10 min. SIMOPS Cont. Cleaning pits, Strap down Equip on trailers and send to Moose Pad. PJSM R/U and test Tree W/ Diesel. Test Tree to 500 PSI for 5 min, 5,000 PSI high for 15 min. 12/22/2019 -Sunday No operations to report. 12/23/2019 - Monday No operations to report. 12/24/2019 -Tuesday No operations to report. THE STATE OIALASKA GOVERNOR MIKE DUNLEAVY Chad Helgeson Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Kuparuk River Oil Pool, MPU F -66A Permit to Drill Number: 196-162 Sundry Number: 319-538 Dear Mr. Helgeson: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, VicPrice DATED this day of December, 2019. RBDMS�w DEC 0 9 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 9n AAr. 95 9R0 RECEIVED NOV 2 6 019 AO � 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Change Approved Program El Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out ❑� 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska LLC Exploratory ❑ Development Q Stratigraphic Service El 196-162 3. Address: 3800 Centerpoint Dr, Suite 1400 6. API Number: Anchorage Alaska 99503 50-029-22697-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D Will planned perforations require a spacing exception? Yes ❑ No ❑� MILNE PT UNIT F -66A 9. Property Designation (Lease Number): ADL -00 10. Field/Pool(s): ADL0355016 I "" �SS$O t $ MILNE POINT / KUPARUK RIVER OIL 11. PRE ENT ikELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 18,823' 7,793' 18,718' 7,719' 1,121 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 112' 20" 112' 112' N/A N/A Surface 8,223' 9-5/8" 8,223' 4,506' 5,750psi 3,090psi Production 18,799' 7" 18,799' 7,776' 7,240psi 5,410psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Schematic See Schematic 2-7/8" 6.5# / L-80 / EUE 8rd 18,107' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): N/A and N/A N/A and N/A 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑✓ Exploratory ❑ Stratigraphic ❑ Development ❑✓ Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 12/9/2019 OIL Q WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Helgeson Contact Name: David Haakinson Authorized Title: Operations Mara 9er Contact Email: dhaakinson hilCO .0 rn Contact Phone: 777-8343 Authorized Signature: Date: 11/25/2019 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: — Plug Integrity ❑ BOP Test 1 Mechanical Integrity Test E] Location Clearance ❑ j Other: ;Z5,0 QS.% 1' `'� ' CFl—� Post Initial Injection MIT Req'd? Yes ❑ No RBDMS_... DEC 0 9 2019 �❑/ Spacing Exception Required? Yes ❑ No Subsequent Form Required: �^ EV .iV APPROVED BY COMMISSIONER THE COMMISSION Date: \i Approved by: \ 1XI �Y65 RI�/1�IN� FJ1 OA03 Revised 4/2017 Approved applicaO it v�I GI ih, t Lthe date of approval. ,012X y Submit Form and ti,1t.1akhments iy Duplicate n Hikoru AIa k., LL, ESP Change -Out Well: MPU F-66 Date: 11-25-19 Well Name: MPU F-66 API Number: 50-029-22697-01 Current Status: Shut-in ESP Producer Pad: F -Pad Estimated Start Date: December P, 2019 Rig: Innovation Reg. Approval Req'd? Yes Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 196-162 First Call Engineer: David Haakinson (907) 777-8343 (0) (307) 660-4999 (M) Second Call Engineer: Taylor Wellman (907) 777-8449 (0) (907) 947-9533 (M) AFE Number: I Job Type: ESP Swap Current Bottom Hole Pressure: 1,734 psi @ 7,293' TVD Maximum Expected BHP: 1,850 psi @ 7,293' TVD MPSP: 1121 psi Max Inclination 77° @ 10,543' MD Max Dogleg: 3.7'/100ft @ 2,600' MD BPV Profile: 2-1/2" CIW Type H Downhole Gauge: 3 -week PBU (8/29 60 -day PBU Extrapolation 14.9 PPG Gas Column Gradient (0.1 psi/ft) Brief Well Summary: MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture stimulation treatment was pumped on the A -sand, however, the job screened out early into the pumping. The well was then completed with an ESP completion without perforating the C -sand. The well has a history of flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500' MD. The last ESP swap was completed in September 2007. Notes Regarding Wellbore Condition • ESP failed due to downhole short on 8/30/19. • The 7" production casing passed an MIT to 3,500 psig on 9/29/1996 o Top of cement at 14,784' MD based on 121 bbl cement displacement and assuming 30% excess hole volume. Objective: • Pull 2-7/8" Tubing String, Centrilift ESP, and Centrilift Motor • Perform 7" Casing Scraper Run g �F • Pressure test 7" Casing to,;56dpsig/ Z Psy� • Install new ESP completion MOO PS.. Pre -Rig Procedure: 1. MIRU Slickline unit a. Pull BPI sleeve from AVA ported nipple @ 17,966' MD b. Pull OV from GLM @ 139' MD. c. Set DV in GLM @ 139' MD. d. RD Slickline Unit 2. RU LRS and PT lines to 3000 psi. 3. Pum 1 IA volume 565 bbls with 8.3 Pump ( ) ppg source -water down IA. 4. Bullhead 108 bbls of 8.3 ppg source -water down tubing to the formation./ 5. Clear and level pad area in front of well. Spot rig mats and containment. ESP Change -Out Well: MPU F-66 Illlcom Alaska, LL Date: 11-25-19 6. RD well house and flowlines. Clear and level area around well. 7. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 McOH. a. Due to the low reservoir pressure, a tubing freeze protect should not be needed. b. Freeze protect is up to the discretion of the Wellsite Supervisor depending on timing for arrival of the rig. 8. RD Little Red Services. Brief RWO Procedure: 9. MIRU Hilcorp Innovation Rig, ancillary equipment and lines to returns tank. 10. Check for pressure and if 0 psi, pull BPV. If needed, bleed off any residual pressure off tubing and casing. If needed, kill well w/ 8.3 ppg source -water prior to pulling BPV. 11. Set TWC. 12. Test BOPS to 250 psi Low/ 2,500 psi High, annular to 250 psi Low/7 900 psi High (hold each ram/valve and test for 5 -min). Record accumulator pre -charge pressures and chart tests. a. Notify AOGCC 24 hours in advance of BOP test. y ti� b. Perform Test per Innovation BOPE Test Procedure Nfl{ c. Confirm test pressures per the Sundry Conditions of approval. s d. Test VBR ram on 4" DP and 2-7/8" test joints e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 13. Contingency: If BOPE test fails a. Notify Operations Engineer (Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr. Jim Regg (AOGCC) via email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to send an inspector to witness test. b. With stack out of the test path, test choke manifold per standard procedure c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the surface equipment for leaks to ensure that the fluid is going down -hole and not leaking anywhere at surface). d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record the pumping rate and pressure. e. Once the BOP ram and annular tests are completed, test the remainder of the system following the normal test procedure (floor valves, gas detection, etc.) f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile / penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list items, pressures and rates. 14. Bleed any pressure off casing to returns tank. Pull TWC. Kill well w/ 8.3 ppg source -water as needed. 15. Rig up spooler for ESP #1 RD cable. a. Baker Hughes representative should be onsite for ESP pull. 16. MU landing joint or spear and PU on the tubing hanger. a. The 2007 Nabors 4ES ESP completion PU weight was 110 Klbs with a Slack -off Weight of 26 Klbs. b. If needed, circulate (long or reverse) pill with lubrican ource-water, and/or baraclean pill prior to laying down the tubing hanger. 17. Recover the tubing hanger. ESP Change -Out Well: MPU F-66 Itilcorn Alaska, LL' Date: 11-25-19 Contingency (If a rolling test was conducted): MU new hanger or test plug to the completion tubing. Re -land hanger (or test plug) in tubing head. Test BOPE per standard procedure. a. Evaluate pulled tubing hanger for possible thread damage. If any damage is found, dispose of tubing hanger and contact well head specialist for replacement. 18. POOH and lay down the 2-7/8" tubing. Lay down ESP and motor. a. Note any sand, scale, or corrosion on the tubulars and ESP on the morning report. b. Send tubulars and equipment to G&I for washing. i. Re -use of tubulars will be dependent upon tubing caliper results. Caliper results are not available at the time of procedure submittal. c. Develop Material Transfer form and indicate the following: i. Discard tubulars and AVA ported Nipple ii. Inspect 2-7/8" GLM and add to field inventory if no damage is found to threads or body. d. The old completion has the following amount of clamps/guards: i. Splice in power cable @ 5,111' MD ii. 488 LaSalle Clamps iii. 5 Protectolizers iv. 3 Flat Guards v 19. PU 7" 26#/ft casing scraper BHA and RIH to 14,900' MD with 4" DP. f e k- 20. Pull up -hole and reciprocate and circulate from 14,750' to 14,850' MD. 21. POOH and LD casing scraper assembly. 22. PU 7" 26#/ft test packer and RIH to ±14,800' MD with 4" DP. 23. Pressure test 7" casing to 1,900 psig: a. Pressure IA up to 2,100 psig and perform a Charted MIT -IA for a minimum target pressure of 1,900 y psi for 30 min (charted). 24. PU new ESP and RIH on 2-7/8" 6.54 L-80 tubing. Set base of ESP assembly at±18,100' MD. a. Test connectivity of ESP cable every 2,000'. b. Install Cannon Clamps on every other joint. c. A combination of used and new tubulars will likely be run on this RWO. 25. Completion Outlined as below: a. Upper 2-7/8"x 1" Side -pocket GLM @ ±200' MD with 0.25" OV b. 2-7/8" tubing i^ C. Downhole gauge for discharge temperature and pressure. i. Connected with a jumper from the lower sensor. Does not require a separate tech -wire. d. Baker Hughes P6 ESP e. Gas Separator f. Baker Hughes 562XP Motor g. Motor gauge h. Base of ESP centralizer @ ±18,100' MD 26. Land tubing hanger. RILDS. Lay down landing joint. Note Pick-up and slack -off weights on tally. ESP Change -Out Well: MPU F-66 IIilmni Alaska, LII Date: 11-25-19 27. Set BPV. 28. ND BOPE. NU 2-9/16" 5,000 # tree and adaptor flange. 29. Pull BPV. Set TWC. 30. Test tubing hanger void to 500 psig low / 5,000 prig high. Test tree to 500 psig low / 5,000 psig high. 31. Pull TWC. 32. RD Hilcorp Innovation Rig, ancillary equipment and lines to returns tank. 33. Turn well over to production. RU well house and flowlines. Attachments: 1. As -built Schematic 2. Proposed Schematic 3. BOP Schematic 0 Milson. Alaska, LLC Orig. DF Elev.: 41.5'/GL Elev.: 12.4 (N22E) SCHEMATIC TREE& WELLHEAD Milne Point Unit Well: MPU F -66A Last Completed: 9/12/2007 PTD: 196-162 Tree 2-9/16" 5M CI W Wellhead 11"x7" FMC Gen SA SM Double Top Actuated Gen 5 Wellhead OPEN HOLE/ CEMENT DETAIL 20" 250 sx of Arcticset I (Approx) in a 24" Hole 9-5/8" 1,675 sx PF'E' & 700 sx Class'G' in a 12-1/4" Hole 7" I 250sx C(ass'G'in a 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID Top Btm BPF 20" Conductor 91.1/H-40/N/A N/A Surface 112' 0.3553 9-5/8" Surface 40/L-80/BTRC&BTC8.835 Gas Separator; GRSFTKW/NRRTR(400internals)9' Surface 8,223' 0.0758 7" Production 26/L-80/BTC MOD 6.276 Surface 18,799' 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface 18,107 0.00579 WELL INCLINATION DETAIL KOP @ 500' Max Hole Angle = 75° to 76'f/ 8,400'- 16,800' Hole Angle through pert interval =47 - STIMULATION 47°STIMULATION SUMMARY 10/23/96 -53 M lbs. 16/20 Carbolite behind pipe. JEWELRY DETAIL TD=18,823 (MD) /TD= 7,793'(TVD) PBTD=18,718' (MD) / POM = 7,719'(M) PFRFORATInN DFTAII SandsfTWop(MD)tm h 12 Item Btm (ND) FT Date Status Kup.ASands1Q488' STA# 1: KBM M 2-7/8" x 1" w/ DGLV set on 11/23/19 7,527' 6' 2-7/8"AVA Ported Nipple w/ AVA BPI sleeve set on 9/11/07 .9' Discharge Head: GPDIS Ref Lag: 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo Jet Charges 65PF @ 6W Phasing n - EHD=0.76" / TTP -6.4" R18,041.9' 2' Pump: PMSSD 204/P31 4' Gas Separator; GRSFTKW/NRRTR(400internals)9' Upper TandemSeal: G583DBUTSB/SBPFSA6' Lower Tanm5eal' Motor: KMH Rerated- 165Hp/2,133V/46A 9 1 18,103' 1 Sensor w/ Centralizer: Pump Mate XTO Bottom PFRFORATInN DFTAII SandsfTWop(MD)tm (MD) Top (TVD) Btm (ND) FT Date Status Kup.ASands1Q488' 7,527' 7,559' 46 10/10/1996 O18,545' J 7,567' 7,598' 1 1 45 1 10/10/1996 Open Ref Lag: 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo Jet Charges 65PF @ 6W Phasing n - EHD=0.76" / TTP -6.4" GENERAL WELL INFO ECompletion E44ES s22E - 10/4/1996 4ES 11/19/1996 /1997 1/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 .0 X31 1 6 Revised By TDF 11/25/2019 R IIilcorn Alaska, LLC Orip, DF Bev.:41.5'/GL Elev.:124' (N22E) PROPOSED Milne Point Unit Well: MPU F -66A Last Completed: 9/12/2007 PTD: 196-162 TREE & WELLHEAD Tree 2-9/16" 5M CI W Wellhead 31" x 7" FMC Gen 5A SM Double Actuated Gen 5 Wellhead OPEN HOLE/ CEMENT DETAIL 20" 250sxof Arcticsetl(Approx)ina24"Hole 9-5/8" 1,675 sx PF'E' & 700 sx Class'G' in a 12-1/4" Hole 7" 250 sx Class 'G' in a 8-1/2" Hole CASING DETAIL Size Type Wt/Grade/Conn ID Top Btm BPF 20" Conductor 91.1/H-40/N/A N/A Surface 112' 0.3553 9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 1 8,223' 1 0.0758 7" Production 26/L-80/BTCMOD 6.276 Surface 18,79' 1 0.0383 TUBING DETAIL 2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface ±18,100' 0.00579 To= 18,823' (M7)/TD=7,793'( VD) PBTD=18,718' (M)) / PBTD= 7,719' TVD) WELL INCLINATION DETAIL KOP @ 500' Max Hole Angle =75 to 76°f/8,400'-16,800' Hole Angle through pert interval = 47° STIMULATION SUMMARY 10/23/96 — 53 M lbs. 16/20 Carbolite behind pipe. JEWELRY DETAIL PERFORATION DETAIL ands pth Item Top (TVD) 0' GLM STA# 1: A Sands PR&Log: 035' Discharge Head: 7,527' 038' Ported Discharge Head 40' WMD:: Pump: 7,567' 65' Gas Separator:70' 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo lei Charges 6SPF @ 60' Phasing n — EHD=0.76" / TTP=6.4" U er Tandem Seal:75' Lower Tandem5eal:80' Motor:98' Sensorw/Centralizer:Bottom@±18,100' PERFORATION DETAIL ands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status A Sands PR&Log: 18'442 18,488' 7,527' 7,559' 46 10/10/1996 Open 18,500' 18,545' 7,567' 7,598' 45 10/10/1996 Open 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo lei Charges 6SPF @ 60' Phasing n — EHD=0.76" / TTP=6.4" GENERAL WELL INFO API: 50-029-22697-01-00 Drilled and Cased by Nabors 22E -10/4/1996 ESP Completion by Nabors 4E511/19/1996 RWO ESP by Nabors 4ES 7/6/1997 RWD ESP by Nabors 4ES 5/31/1998 RWO ESP by Nabors 4ES 9/26/1999 RWO ESP by Nabors 4ES 5/27/2002 RWO ESP by Nabors 4ES 9/12/2007 Revised By TDF 11/25/2019 Innovation Rig BOP Schematic 9.5/8" DBL D Seal Casing Hanger 5-22 13-5/8" NOM 9-518" BTC Btm x 10.5"-4 SA Pin Top W/ Primary Seal 13-518" 5M Control Technology Annular BOP 0 13-518" 5M Control o Technology Double Ram 0 � ------'--13-5/8"W Control Technology Single Ram 13-5/8" x 5M ---11"x5M \-2-1116" x 5M 13.5/8" x 5M \-2-1/16"x 5M -20" Casing 9-5/8" Casing • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 2.0'12 Mr. Tom Maunder l Alaska Oil and Gas Conservation Commission 1 ( 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 102 N/A 10.2 N/A 122.4 8/7/2011 MPF-02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top Job MPF-34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF -37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011 MPF -38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF -41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF -45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A MPF -49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF -62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 ."----). MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF -69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011 MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF -80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF-81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF-82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF-83 2000930 50029229630000 1.2 N/A 1.2 N/A 13.6 8/3/2011 MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 _ N/A 1.3 N/A - 11.9 8/11/2011 STATE OF ALASKA /p.,~~ ALA OIL AND GAS CONSERVATION COM~SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: ^ Abandon ®Repair Well ^ Plug Pertorations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ' ^ Change Approved Program ^ Operation Shutdown Change out ESP ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 196-162 - 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22697-01-00 ' 7. KB Elevation (ft): 41.50 9. Well Name and Number: MPF-66 A J~~ ~~ (~ ~ 8. Property Designation: 10. Field /Pool(s): _ ADL 355016 ~ Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 18823, feet true vertical 7793 ° feet Piugs (measured) None Effective depth: measured 18718 feet Junk (measured) 18212' true vertical 7719 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 112' 112' 1490 470 Surface 8192' 9-5/8" 8223' 4506' - 5750 3090 Intermediate Production 18771' 7" 18799' 7776' 7240 5410 Liner P ' ' ~~~ ~ g 2007 ~~, erforation Depth MD (ft): 18442 - 18545 Perforation Depth TVD (ft): 7527' - 7597' Tubing Size (size, grade, and measured depth): 2-7/8", 6.5# L-80 18107' Packers and SSSV (type and measured depth): None 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final p ressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: 0 0 0 580 0 Subsequent to operation: 203 35 74 300 282 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ~ Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Howard West, 564-5471 Printed Name Sondra Stewman Title Drilling Technologist Si ~ D - Prepared By NametNumber: ~ ~._a~ gn ture f Pone 564-4750 at Sondra Stewman, 564-4750 Form 10-404 Revised 04/2006 ~''~ ~ ('~ I n' n ~a ~~~~ l~b/~ ] ~ ~ Submit Original Only r ~~"--1 Tree: 2-9/16" 5M CIW ~ Wellhead: 11 " x 7" FMC Gen. 5A Double actuated gen 5 wellhead 20" 91.1 ppf, H-40 115' KOP @ 500' Max. hole angle = 75 to 76 deg. 8400' to 16,800' Hole angle thru' perfs = 47 deg. 9 5/8", 40 ppf, L-80 Btrc. .822; 2-7/8", 6.5#, L-80 8rd,EUE (2.441" ID, Cap..00579 bbls 7" 26 ppf, L-80, Btrc.prod. casinc (top 125 jts have Mod. Btrs, rem std. Btrs.) ( drift ID = 6.151", cap. = 0.0383 Stimulation Summary 10/23/96 Frac 53 M# of 16/20 c behind pipe. Perforation Summary Ref Iog:Atlas GR/ CCL dated 1 Size SPF Interval (- 'A' Sands 3-3/8" 6 18442'-18488' 752E 3-3/8" 6 18500'-18545' 756E mid-pert = 7560' tvd 18493' md. Ori~ Elev. = 41.5 (N 22E} Orig. GL Elev. = 12.40' DF To Csg. spool= 28.50' (N 22E) Cameo 2 718" x 1" 139` sidepocket KBMM GLM 1ES 9 5/8" ES" 1829' ;ementer ;'8" AVA ported nipple 75" ID through sleeve 59` Min. ID through nipple 17966` rilift ESP, 18042' s 204 P11 SXD rilift Gas Separator 18064` FTXA rilift Seal Sections ~sua- ag n~sa 18069` 'y~3L.T AB PFSA CL5 rilift KMH, 18083' ~p motor,2305v /60 ~~ 18102` ipmate XTO w/ 6 fin Cent. 0 7" x 20' marker joints f/ 18,212' - 252' wlm w/ RA tag in top colts iokiine tagged TD @ i 8685' 9t25i99 "' float collar (PBTD) 18,718' 7" float shoe 18,799' 11/4/96 M. Linder Initial Com letion,#2 4-ES 7/6/97 os3o3isa M. Linder #3 & #4 RWO Nabors 5-S 09/26/99 os/27/o2 M. Linder #5 & #6 RWO Nabors 4-ES 09/12/07 REH ESP RWO by Nabors 4ES MILNE POINT UNIT WELL F-66A API NO: 50-029-22697-01 MPU F-66A • BP EXPLORATION Page 1 of 3 Operations Summary Report Legal Well Name: MPF-66 Common Well Name: MPF-66A Spud Date: 8/21/1996 Event Name: WORKO VER Start : 9/9/2007 End: 9/13/2007 Contractor Name: NABOBS ALASK A DRI LLING I Rig Release: 9/13/2007 Rig Name: NABOB S 4ES Rig Number: I Date From - To Hours Task ' Code NPT Phase ~ Description of Operations 9/9/2007 ~ 08:00 - 09:00 ' 1.00, RIGD P PRE ~ - __ __ Lower & scope down derrick. ~ 09.00 - 15:30 6.50 MOB P PRE ( Move Rig from MPG -07 to MPF -66a. 15:30 - 17:00 I 1.50 RIGU P PRE Raise & scope up derrick. Rig up equip. 17:00 - 19:00 ~ 2.00 RIGU P PRE Spot in pipe shed & pits. Con't to R/U lines & equip. 19:00 - 20:00 '; 1.00 PULL P DECOMP R/U lines to tree & tiger tank. Take on heated seawater. '' 20:00 - 21:00 1.00 PULL P DECOMP P/U lubricator, test to 1000 psi. & pull BPV. VD lubricator. 21:00 - 21:30 ~ 0.50 PULL P DECOMP Hold PJSM & Pre-Spud meeting. Review wellkill opertaion & assign tasks to specific personnel. 'i 21:30 - 00:00 2.50 PULL P DECOMP Pressure test lines to 250 / 3500 psi. Open well SITP 600 psi, SI IAP 550 psi. Open thru choke & bleed off Tbg/Ann to 0 psi. Begin kill operation, Pump 4 BPM @ 1600 psi, Caught fluid @ i, , 112 bbls. OAP when from 0 to 300 psi. Con't to circulate well. 9/10/2007 ~, 00:00 - 02:30 2.50 KILL DECOMP Con' t to cirulate & kill well. 4 BPM @ 1600 psi. Pumped total of 810 bbls Had clean hot seawater returns. S/D Well dead. ~, Open both sides ,both on vacuum. Recoverd 515 bbls of fluid. '~ est. 95% oil. Losses averaged 25% during kill operation. OAP ', incresed to 600 psi, then bled to 300 psi. After kill operation ~ OAP went to 0 psi. 102:30 - 03:30 1.00 KILL DECOMP Monitor well. Hold PJSM. 1 03:30 - 04:30 1.00 WHSUR DECOMP P/U T-bar & install TWC. Pressure test TWC from top w/ 3500 1 psi for 10 min. Pressure test TWC from bottom by pumping 3 BPM @ 60 psi for 10 min. Charted testing. 04:30 - 06:00 1.50 DECOMP Bleed off tubing void. N/D tree. 06:00 - 09:30 3.50 KILL DECOMP Tree removed, inspect hanger threads (3" LH Acme). Screw in landing joint XO w/ 9 1/2 turns. NU BOPE 09:30 - 13:00 3.50 BOPSU DECOMP BOPE Test 250 psi low / 3500 psi high. Test 13 5/8" Annular, 2 7/8" x 5" VBR, Blind/Shear rams, 3 1/8" Choke, HCR, Kill line. 13 valves on choke manifold. Also, Koomey drawdown test. RKB of 20.60'. Well techs shoot fluid level in IA @ 10:00 w/ level @ 2000'. 13:00 - 14:00 1.00 BOPSU DECOMP PUMU Opso-Lopso. Torque up XO to 3" LH Acme for hanger. Screw into hanger w/ 9 1/2 turns. MU nipple and valve on PI sub. MU lubricator w/ TWC pulling tool. Pressure test lubricator and OL to 1000 psi. Pull TWC w/ 0 psi tuibng ~ pressure. Shoot FL in IA @ 14:30 w/ level @ 2000'. Break out and laydown lulbricator and OL. 14:00 - 15:00 1.00 PULL DECOMP PUMU 3 1/2" IF landing jt w/ XO to 3" LH Acme. Install TIW I valve on top, torque XO and screw into hanger. BOLDS. Attempt to pull completion. Pull to 125K max (116K max on tubing + 12K block wt.) Work pipe numerous times, unable to pull completion 15:00 - 17:00 ~ 2.00 PULL DECOMP Mix 40 Bbls SW pill w/ EP mud tube. Circulate long way @ 5 BPM, 1600 psi. Catch fluid in tubing @ 22 Bbls pumped, returns to surface after pumping 88 Bbls. Displace pill through i AVA sleeve above ESP. Work pipe occasionally while ~ circulating pill. Pull free w/ 125K, PUW of 110 K to pull hanger to floor. Visually inspect hanger and continue to circulate to positon EP pill - 4000' 17:00 - 18:00 1.00 PULL DECOMP Break out and laydown hanger and landing joint. RU floor to ~ pull ESP completion Start POOH & stand back 2 7/8" 18:00 - 18:30 0.50 PULL DECOMP completion. Crew Change. Inspect derrick. Check PVT alarms. j 18:30 - 19:30 I 1.00 PULL ~ DECOMP ~ POOH & stand back 2 7/8" ESP completion. Pulled 24 stands. Printed: 10/3/2007 2:20:49 PM • • BP EXPLORATION Page 2 of 3 Operations Summary Report Legal Well Name: MPF-66 Common Well Name: MPF-66A Spud Date: 8/21/1996 Event Name: WORKOVER Start: 9/9/2007 End: 9/13/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/13/2007 Rig Name: NABOBS 4ES Rig Number: ' Date _ From - To Hours Task 'Code NPT Phase Description of :Operations 9/10/2007 19:30 - 20:00 '', 0.50 PULL _ - - DECOMP - _ - - Change out reels in spooling unit. 20:00 - 00:00 ' 4.00 PULL DECOMP Con't to POOH & stand back 2 7/8" completion. Pulled 78 stands. 9/11/2007 00:00 - 02:00 ! 2.00 PULL P DECOMP Con't to POOH & stand back 2 7/8" ESP completion. Pulled 109 stands. 02:00 - 02:30 ; 0.50 PULL P DECOMP Change out reels on Spooling unit. 02:30 - 06:00 3.50 PULL P DECOMP Con't to POOH & stand back 2 7/8" ESP completion. Pulled 165 stands of 189 stds. 06:00 - 08:00 ~ 2.00 PULL P DECOMP Continue POOH w/ ESP completion. Recover 499 LaSalle I 08:00 - 10:00 '~ 2.00 PULL P DECOMP clamps, 3 flat guards, 3 protectalizers. Break out & UD ESP Assembly. Cable check was balanced phase to phase, but grounded out. Motor turned freely, pump I turned but was "stiff". 10:00 - 11:30 1.50 PULL P DECOMP FIII hole w/ 35 Bbls of SW. Secure well for Safety meeting. Hold weekly safety meeting with alt crew members. 11:30 - 15:00 I 3.50 RUNCO<y 1P j RUNCMP O en blind rams, fill hole w/ 10 Bbls of SW. PU / MU ESP I ~ ~ BHA. 204P11 - SXD pump on 228 HP KMH motor w/ Pumpmate XTO sensor. Load hole w/ 30 Bbls of SW. Check ~ conductivity of cable - OK. 15:00 - 18:00 I 3.00 i BUNCO P RUNCMP RIH w/ ESP completion on 2 7!8" tubing from Derrick. Install 5 protectolizers, 3 flat guards, and Lasalle clamps on every joint for the first 410 jts, then every other joint to surface for a total of 490 LaSalle clamps. Fill tubing while checking conductivity of cable eve -2,000'. Fill w/ 13 stks / 2200 psi. ESP very tight. Utilize Best-O-Life pipe dope w/ 2300 ft/Ibs M/U torque. - Note:Condition of Control cable run is experienced. 18:00 - 23:00 I 5.00 BUNCO P RUNCMP Con't in hole, filling pipe /circulating and checking conductivity ~ every -2,000' @ 1 bpm / 500 psi. 23:00 - 00:00 ~I 1.00 BUNCO P RUNCMP Make reel to reel splice for control cable @ + 8,000' and /std # 81. 9/12/2007 00:00 - 03:00 3.00 BUNCO P RUNCMP Con't to make reel to reel swap for control cable @ + 8,000' and /std#81 03:00 - 09:00 6.00 BUNCO P RUNCMP Con't in hole w/ ESP completion assembly, filling pipe / circulating, and testing conductivity every -2000'. -Install LaSalle clamps on first 410 jts, then every other joint to surface. ~ } -Total of 488 LaSalle clamps. Make second cable splice @ 151 stands in hole (-14000'). 09:00 - 13:30 4.50 ~ ~ BUNCO P RUNCMP Centrilift splicing ESP cable. (spool to spool splice). Top 3600' ', i I ~ ~ of ESP cable is NEW cable. I, ; -Make cable checks /post splice - ok. ', 13:30 - 16:00 ', 2.50; . BUNCO P RUNCMP RIH w/ remaining 39 stands of 2 7/8" tubing from Derrick. I ~ -Jewelry run = 488 LaSalle clamps, 3 Flat guards, 5 ' i Protectalizers. ' 16:00 - 16:30 ' 0.50 ~ BUNCO P RUNCMP PU / MU landing joint and tubing hanger. 16:30 - 18:30 i, 2.00; BUNCO RUNCMP Cut ESP cable and make penetrator splice. Attach Field connector to Penetrator and test. ' 18:30 - 19:00 ' 0.501 BUNCO RUNCMP ESP completion string PU wt of 81 K / SO wt of 45K. j Land Tbg hanger. KILOS. UD Landing jt. 19:00 - 20:00 ' 1.00 BUNCO RUNCMP Flush pump w! 10 bbls of SW @ 3 BPM / 40 psi. ( -Set TWC & test from top to 1000 psi f/ 10 min & chart. Printed: 10/3/2007 2:20:49 PM ~ ~ BP EXPLORATION Page 3 of 3 Operations Summary Report Legal Well Name: MPF-66 .Common Well Name: MPF-66A Spud Date: 8/21/1996 Event Name: WORKOVER Start: 9/9/2007 End: 9/13/2007 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/13/2007 Rig Name: NABOBS 4ES Rig Number: Date From - To ';~ Hours Task 'I Code ~, NPT ~ Phase Description of Operations 9/12/2007 19:00 - 20:00 i 1.00 BUNCO P ~ RUNCMP -Attempt to test TWC from below @ 3 bpm / 40 psi f/ 5 min. ~ -R/D & blow down lines. 20:00 - 21:30 ~ 1.50 WHSUR P j ~ RUNCMP N/D BOPs. 21:30 - 23:30 2.OO WHSUR P RUNCMP N/U Tree. Test Tree & void to 5000 psi. Make final check on ESP. ~ j -BHT= (BHT= 185 F & Motor temp= 185 F). ~ -BHP= 2661 psi. -Phase to Phase test motor & cable (reading= 6.0 OHMs). 1 j -Phase to Ground= 300 Mega OHMS. 23:30 - 00:00 0.50 1 WHSUR P i RUNCMP P/U Lubricator test to 1000 psi, pull TWC. 9/13/2007 00:00 - 00:30 0.50 i WHSUR i RUNCMP Load BPV into lubricator, test lubricator to 1000 psi. ~ -Set BPV, L/D lubricator. 00:30 - 01:00 0.50 ~ WHSUR RUNCMP Attempt to test BPV. ~ -Pump down annulus @ 3 bpm / 60 psi f/ 16 bbls. j -R/D lines, secure Tree & cellar. ~ I -Release Rig @ 01:00 hrs. Prep for move to MPF-99. Printed: 10/3/2007 2:20:49 PM 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: ~ . STATE OF ALASKA . /~~.O; ALASØ'OIL AND GAS CONSERVATION COMM..)N REPORT OF SUNDRY WELL OPERATIONS D D D RECEIVED .AN 1 6 2007 P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development W ' Stratigraphic Stimulate [2] , WaiverD Time Extension D Anchorage Re-enter Suspended Well D 5. Permit to Drill Number: 196-1620 ¡ 'on 3. Address: Exploratory Service 6. API Number: 50-029-22697-01-00 ./ 9. Well Name and Number: 41.5 KB MPF-66A I 10. Field/Pool(s): MILNE POINT Field/ KUPARUK RIVER OIL Pool / 8. Property Designation: ADLO-355016 . 11. Present Well Condition Summary: Total Depth measured true vertical 18823 ' 7793.2 ' feet feet Plugs (measured) Junk (measured) None None Effective Depth measured 18718 feet true vertical 7719 feet Casing Length Size MD TVD Burst· Collapse Conductor 80' 20" 91.1# H-40 32' - 112' 32' - 110' 1490 470 Surface 8192' 9-5/8" 40# L-80 31' - 8223' 31' - 4506' 5750 3090 Production 18771' 7" 26# L -80 28' - 18799' 28' - 7776' 7240 5410 Perforation depth: Measured depth: 18442 - 18464 True Vertical depth: 7527.28 -7542.41 18464 - 18488 18500 - 18521.._---1852t- 18545 ........c "",,,,,..,.-I/''"-'~'''' _','. 7542.41 - 7558.9"'" 7567.21 - 7581.7 7581 :7- 7598.29 Tubing: (size, grade, and measured depth) 2-7/8" 6.5# L-80 o 18098' Packers and SSSV (type and measured depth) NONE o ~-^tI.\M¡:D JAN 25 lOD7 o &w..... o o o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): ..5¥ . .... (~BDMS 8Ft .- 2 5 2007 Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 34 282 Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 7 0 0 55 0 0 15. Well Class after oroposed work: Exploratory Development W 16. Well Status after proposed work: Oil P' _ Gas WAG Tubing pressure 336 301 Service x Contact Gary Preble WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Signature Title Data engineer Phone 564-4944 Date 1/15/2007 ORIGINAL k \'~(L Submit Original Only rp~; "¿l> I· z.." ,Q 7 . . MPF -66A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY CTU #5. Acid Wash. *** Continued on WSR 1/8/2007 ***. Hard tag at 17920' Lay in 5 bbls of 12% DAD acid. Squeeze 5 bbls through pump over 60 minutes. Start pump and circulate 10 bbls of fluid to open top tank holding 300 psi back pressure over 25 minutes. Squeeze 10 bbls back through pump. Last part of injection should 600 psi/min bleed off. When 10th barrel was taken through pump, bleed off of preesure slowed to 250 psi per minute. Decision made by MPU Well Ops supervisor to POOH and freeze protect well from 2500' with 60/40 meth. Pad operator notified of status. Standby for weather(-40 F) to rig down. RD CTU. *** Job complete *** FLUIDS PUMPED BBLS 85 1% XS KCI 90 60/40 METH 5 12% DAD ACID (TITRATION: 12.2% HCI; IRON<50 PPM) 180 TOTAL 1. Operations performed: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 z~. Location of well at surface 2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 907' NSL, 2996' EWL, SEC. 20, T14N, R10E, UM At effective depth 1105' NSL, 3059' EWL, SEC. 20, T14N, R10E, UM At total depth 1176' NSL, 3082' EWL, SEC. 20, T14N, 'R10E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Structural Conductor Surface Intermediate Production Liner r-i operation Shutdown 1'! Stimulate r'! Plugging I-I Perforate I~! Pull Tubing D Alter Casing I~ Repair Well I~ Other 5. Type of well: I~ Development r"i Exploratory I"i Stratigraphic r'-I service Plugs (measured) 18823 feet 7793 feet 18718 feet 7719 feet Length Junk (measured) Casing Size Cemented 80' 20" 8192' 9-5/8" 250 sx Arcticset ! (Approx.) 1675 sx PF 'E', 700 sx Class 'G' 18771' 7" 250 sx Class 'G' Change out ESP 6. Datum Elevation (DF or KB) KBE = 41.50' 7. Unit' or Property Name Milne Point Unit 8. Well Number MPF-66A 9. Permit Number / Approval No. 196-162 , , , 10. APl Number 50-029-22697-01 , ,, 11. Field and Pool Milne Point Unit / Kuparuk River Sands , MD TVD 112' 112' 8223' 4506' 18799' 7776' Perforation depth' measured 18442' - 18488', 18500' - 18545' true vertical 7527' - 7559', 7567' - 7598' Tubing (size, grade, and measured depth) 2-7t8", 6.5#, L-80 set at 18098' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED 200'2 14. Oii-Bbl Prior to well operation: Subsequent to operation: 15. Attachments r"] copies of Logs and Surveys run I~ Daily Report of Well Operations 17. I hereby certify~that the foregoing is tru_g~and correct to the best of my knowledge Representative Dairy Average Production or Injection Data Gas-Mcr Water-Bbl 16. Status of well classifications as: ~ Oil I-! Gas I-i Suspended Form 10-404 Rev. 06/15/88 Casing Pressure Tubing Pressure Service Prepared By Name/Number: Sondra Stewman, 564-4750 /~ ,SCANNED JUN 2, & '2002 SL~bmi't in Duplicate "-~-.~ , Legal Well Name' MPF-66A Common Well Name: MPF-66A Spud Date: Event Name: WORKOVER Start: 5/24/2002 End: 5127/2002 Contractor Name: NABORS DRILLING CO. Rig Release: 5/27/2002 Rig Name: NABORS 4 Rig Number: 4ES .... :~"~!"D:~te"iii'i!'-i: 'i.i~6~"~ii~i~-i i~ ~:~?~'i '"~'~R!i~:;-i'~:0~~I .... !iNPI~!'i Phase ':. ~. Description of Operations 5/24/2002 18:00 - 00:00 6.00 MOB P PRE MI/RU 5/25/2002 00:00 - 04:00 4.00 RIGU P PRE MI/RU & SAFE OUT EQUIPMENT RIG ACCEPT @ 0400 HRS. 5/25/2002 04:00 - 09:00 5.00 KILL P DECOMP CHG OUT DRLG LINE & TAKE ON SEAWATER 09:00- 10:30 1.50 KILL P DECOMP RIG LINES TO TREE & TIGER TANK 10:30- 11:30 1.00 KILL P DECOMP RIG LUBRICATOR & PULL BPV 11:30- 15:30 4.00 KILL P DECOMP KILL WELL WITH 8.5 PPG. SEAWATER & MONITOR SAME 15:30- 16:00 0.50 WHSUR P DECOMP SET TWC 16:00- 17:30 1.50 WHSUR P DECOMP NIPPLE DN TREE 17:30 - 21:00 3.50 BOPSUF P DECOMP NIPPLE UP BOP & CHG OUT BLIND RAMS. 21:00 - 00:00 3.00 BOPSUF; P DECOMP TEST BOP TO 250 LOW & 3500 HIGH (TEST WAIVED BY CHUCK SHEVE WITH AOGC) 5/26/2002 00:00 - 01:00 1.00 BOPSUF; P DECOMP PULL TWC 01:00 - 02:00 1.00 PULL P DECOMP MU LANDING JT. & PULL HANGER TO FLOOR. 02:00 - 15:00 13.00 PULL P DECOMP POOH WITH ESP COMPLETION & MAKE TWO SPOOL CHANGES 15:00- 16:00 1.00 PULL P DECOMP LAY DN ESP ASSY. 16:00- 20:00 4.00 RUNCOI~ COMP MU ESP ASSY & CHECK OUT & SERVICE SAME. 20:00 - 00:00 4.00 RUNCOI~ COMP RIH WITH ESP ASSY. 5/27/2002 00:00 - 12:00 12.00 RUNCOI~ COMP RIH WITH ESP COMPLETION TO HANGER 12:00 - 14:30 2.50 RUNCOI~I~ COMP MU HANGER & MAKE EFT CONNECTOR & LAND SAME & RILDS 14:30 - 16:00 1.50 BOPSUF P COMP SET TWC & NIPPLE DN BOP 16:00- 17:00 1.00 WHSUR P COMP NIPPLE UP TREE. 17:00 - 17:30 0.50 WHSUR P COMP TEST TREE & ADAPTER FLG TO 5000 PSI. 17:30 - 18:00 0.50 WHSUR ~ COMP RIG LUBRICATOR & PULL TWC & SET BPV & RELEASE RIG @ 1800 HRS. 5/27/2002 RECEIVED JH Ii) 2002 Printed: 5/28t2002 11:41 '18 AM SGANNED JUN 2002 THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON' OR BEFORE JANUARY 03,2001, M P L A T W T H E IA L U N D E r~ IS M ARK Eh[ C:LO~M.DOC STATE OF ALASKA ALASKA O' -\ND GAs CONSERVATION COMF' SION REPOR i OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [~ Stimulate [~ Plugging [] Perforate [] Pull Tubing []Alter Casing [] Repair Well []Other 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 4. Location of well at surface 2165' NSL, 2606' WEL, SEC. 6, T13N, R10E At top of productive interval 907' NSL, 2941' EWL, SEC. 20, T14N, R10E At effective depth 1105' NSL, 3003' EWL, SEC. 20, T14N, R10E At total depth 1176' NSL, 3026' EWL, SEC. 20, T14N, R10E 5. Type of well: ~ Development [~ Exploratory [~ Stratigraphic E~ Service 6. Datum Elevation (DF or KB) KBE = 43.45' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-66A 9. Permit Number / Approval No. 96-162 10. APl Number 50-029-22697-01 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 18823' feet 7792' feet 18718' feet 7718' feet Length Size 80' 20" 8192' 9-5/8" Plugs (measured) Junk (measured) Cemented 250 sx Arcticset I (Approx.) 1675 sx PF 'E', 700 sx Class 'G' 18771' 7" 250 sx Class 'G' MD TVD 112' 112' 8223' 4506' 18799' 7775' Perforation depth' measured true vertical 18442'-18488'; 18500'-18545' 7486'-7517'; 7526'-7557' Tubing (size, grade, and measured depth) 2-7/8" 6.5#, L-80 set at 17818' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure Anchorage 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments 17. Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classifications as: [~ Oil [] Gas [~] Suspended Service I hereby certify that the foregoing is true and correct to the best of my knowledge Signed KATRINA N. COOPER Title Production Engineer Prepared By Name/Number: Date Michael Williams Form 10-404 Rev. 06/15/88 Submitln Du MPF-66A DESCRIPTION OF WORK COMPLETED Stimulation Operation 03/13/99 AESP 2000 Stimulation Treatment was performed using the following fluids: SUMMARY A cleanup operation was performed down TBG thru ESP and into formation with IA fluid packed. Appeared to be very tight during treatment and slickline MIRU to pull dummy out of top station and set screened orifice (5bbls ESP 2000 displaced) Fluids Pumped i, BBLS. Description 5 ESP 2000 ~ 40 Diesel 461 Dead crude 506 Total Pumped .... STATE OF ALASKA ALASK/, ,.)IL AND GAS CONSERVATION CO,vrMISSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: I~Operation Shutdown I--IStimulate I~jPlugging i-]Perforate [~ Pull Tubing ~lAIter Casing I--J Repair Well [~ Other Change out ESP 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM At top of produ, ctive interval 907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM At effective depth 1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM At total depth 1176' NSL, 3026' EWL, SEC. 20, T14N, R10E, UM 5. Type of well: [~ Development [--I Exploratory l--I Stratigraphic [--lService 6. Datum Elevation (DF or KB) KBE -- 43.45' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-66A 9. Permit Number / Approval No. 96-162 10. APl Number 50-029-22697-01 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 18823 feet 7792 feet 18718 feet 7718 feet Length Size 80' 20" 8192' 9-5/8" 18771' 7" Plugs (measured) Junk (measured) Cemented 250 sx Arcticset I (Approx.) 1675 sx PF 'E', 700 sx Class 'G' 250 sx Class 'G' MD TVD 112' 112' 8223' 4506' 18799' 7775' Perforation depth: measured true vertical 18442'-18488',18500'-18545' 7526'-7558',7566'-7597' Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 18085' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL Anchorage 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments E~] Copies of Logs and Surveys run [~ Daily Report of Well Operations 16. Status of well classifications as: [~ Oil I--I Gas i--] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,,~~ ~ Terrie Hubble Title Technical Assistant III Prepared By Name/Number: Date i 0 '(~' C~ Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Du Facility Date/Time 23 Sep 99 24 Sep 99 M Pt F Pad Progress Report Well MPF-66A Page 1 Rig Nabors 4ES Date 06 October 99 02:00-06:00 02:00-06:00 06:00 06:00-11:00 06:00-11:00 11:00 11:00-14:00 11:00-14:00 14:00 14:00-17:00 14:00-17:00 17:00 17:00-22:30 17:00-22:30 22:30 22:30-00:00 22:30-23:00 23:00 23:00-00:00 00:00 00:00-02:00 00:00-02:00 02:00 02:00-04:00 02:00-04:00 04:00 04:00-05:00 04:00-05:00 05:00 05:00-06:00 05:00-06:00 06:00 06:00-08:45 06:00-08:45 08:45 08:45-10:00 08:45-10:00 10:00 10:00-05:00 10:00-19:00 19:00 19:00-21:30 Duration 4hr 4hr 5hr 5hr 3hr 3hr 3hr 3hr 5-1/2 hr 5-1/2 hr 1-1/2 hr 1/2 hr lhr 2hr 2hr 2hr 2hr lhr lhr lhr lhr 2-3/4 hr 2-3/4 hr 1-1/4 hr 1-1/4 hr 19hr 9hr 2-1/2 hr Activity Move rig Rig moved 20.00 % Rig is being moved to MPF-66 Began precautionary measures Move rig (cont...) Rig moved 100.00 % MI/RU & Spot Derrick level & rig Components & safe out equipment. At well location - Slot Derrick management Rigged up High pressure lines Take on seawater & set tiger tanks & & install lines to tree & test same to 2500 psi. Equipment work completed Wellhead work Removed Hanger plug Remove bpv sicp=500 psi. sitp=0 & hold safety meeting with anchorage personell Equipment work completed Well control Circulated closed in well at 18240.0 ft circ. & bull head influx from well bore & monitor same well on slight vacumn.both sides. Hole displaced with Seawater- 125.00 % displaced Wellhead work Installed Hanger plug Equipment work completed Removed Xmas tree Equipment work completed Nipple up BOP stack Installed BOP stack Equipment work completed Test well control equipment Tested BOP stack Pressure test completed successfully - 3500.000 psi test witnessed by John crisp with aogc. Wellhead work Removed Hanger plug Equipment work completed Derrick management Rigged up Completion string handling equipment Stopped · To hold safety meeting crew change. Fluid system Circulated at 15000.0 ft Obtained clean returns - 200.00 % hole volume Wellhead work Removed Tubing hanger Equipment work completed Pull Single completion, 2-7/8in O.D. Pulled Tubing in stands to 9248.0 ft Stopped · To change handling equipment Serviced Completion string handling equipment change spool in spooler & rig up additional .... .' ...... .... .~.'_ · ,~q"'t, ....... [~, ,.,~, ...... oil.~-~--,.., csp cable. Facility Date/Time 25 Sep 99 26 Sep 99 Progress Report M Pt F Pad Well MPF-66A Page 2 Rig Nabors 4ES Date 06 October 99 Duration Activity 21:30 21:30-04:00 04:00 04:00-05:00 05:00 05:00-06:00 05:00-06:00 06:00 06:00-11:00 06:00-11:00 11:00 11:00-06:00 11:00-13:30 13:30 13:30-19:30 19:30 19:30-22:30 22:30 22:30-03:30 03:30 03:30-06:00 06:00 06:00-10:30 06:00-08:00 08:00 08:00-10:30 10:30 10:30-11:30 10:30-11:30 11:30 11:30-13:00 11:30-13:00 13:00 13:00-14:00 13:00-14:00 14:00 14:00-15:00 14:00-15:00 15:00 15:00-06:00 15:00-16:00 16:00 6-1/2 hr lhr lhr lhr 5hr 5hr 19hr 2-1/2 hr 6hr 3hr 5hr 2-1/2 hr 4-1/2 hr 2hr 2-1/2 hr lhr lhr 1-1/2 hr 1-1/2 hr lhr lhr lhr lhr 15hr lhr Equipment work completed Pulled Tubing in stands to 85.0 ft Stopped: To pick up/lay out tubulars Rigged down sub-surface equipment - ESP Work completed, equipment laid out Slickline wireline work Rigged up sub-surface equipment - Cleaning / Investigation tools Equipment work completed Slickline wireline work (cont...) Conducted slickline operations on Slickline equipment - Tool run HES Ran 3.63" Swedge to 18685' & rig dn unit. Completed run with Cleaning / Investigation tools from 0.0 ft to 1868 Run Single completion, 2-7/8in O.D. Rigged up sub-surface equipment - ESP Work completed - ESP in position Ran Tubing in stands to 7300.0 ft Stopped: To splice cable Serviced ESP make mid-line splice Equipment work completed Ran Tubing in stands to 15300.0 ft Stopped: To splice cable Serviced ESP make mid-line splice Stopped: To hold safety meeting crew change Run Single completion, 2-7/8in O.D. (cont...) Ran Tubing in stands to 18100.0 ft Completed run with ESP to 18100.0 ft Serviced ESP splice esp cable at hanger. Equipment work completed Wellhead work Installed Tubing hanger Equipment work completed, seal energised Nipple down BOP stack Removed BOP stack Equipment work completed Wellhead work Installed Xmas tree install tree & test same to 5000 psi. Equipment work completed Wellhead work Removed Hanger plug Remove twc & set bpv. Equipment work completed : ~ .. Fluid system Freeze protect well - 14.000 bbl of Diesel freeze protect tbg. only. Completed operations 5.0 fl MEMORANDUM TO: State of Alaska Alaska Oil and Gas Conservation Commission _ i Robert Christensor~/~ DATE: September 24, 1999 Chairman THRU: Blair Wondzell, ~~ P. !. Supervisor ?/2'rl~ FROM' John Crisp?~/~ SUBJECT: Petroleum Irfspector FILE NO: bop nabors 4es 9-24-99 jc. doc BOPE TEST Nabors 4ES MPU F-66A PTD 46-142 September 24,1999: Traveled to BPX's milne point unit to witness BOP test. Atttached is the AOGCC BOPE test report for reference. Pressure gauge on accumulator for annular preventer was not operating properly. The gauge has been replaced. Conducted rig inspection after BOPE test. Rig & location were in good shape. SUMMARY: BOPE test witnessed by AOGCC inspector. One failure noted & repaired. Attachments' bop nabors 4es 9-24-99 jc.xls cc; NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 4 1/2 Test: Initial X Workover: x Nabors Rig No. 4ES PTD# BPX Re p.: F-66 A Rig Rep.: Set @ 18,823 Location: Sec. Weekly Other i~ TEST:.iDATA 46-142 DATE: 9/24/99 Rig Ph.# 659-4154 Larry Meyers Gene Sweat 6 T. 13N R. IOE Meridian Umiat Test Pressures 250 - 3500 MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign YES Drl. Rig OK Hazard Sec. YES BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250 -250O P 250 - 3500 P 1 250 o 3500 P I 250 - 3500 P I 250 - 3500 P 2 250 - 3500 P 1 250 - 3500 P N/A 250 - 3500 MUD SYSTEM: Visual Alarm Trip Tank X X Pit Level Indicators X X Flow Indicator X X Meth Gas Detector X X H2S Gas Detector X X FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Quan. N/A I N/A Test Pressure 250 - 3500 250 - 3500 250-3500 P 250-3500 P P/F CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 11 250- 3500 P 22 250- 3500 P Functioned Functioned OK OK ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 4 @ 1700 3,000 1,800 minutes 23 sec. . minutes 2 sec. X Remote: X' Psig. :: ': : ~ :: :~ :, : : TESTRESULTSi Number of Failures: '/ ,Test Time: 4.0 Hours. Number of valves tested 17 Repair or Replacement of Failed Equipment will be made within I days. Notify the Inspector and follow with Written or Faxed verification to ttle AOCCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Pressure gauge for annular preventer on koomey failed. Distribution: Grig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES NO 24 HOUR NOTICE GIVEN YES NO Waived By: Witnessed By: John Crisp FI-021L (Rev. 12/94) BOPE NABORS 4ES 9-24-99 JC.xls PERMIT 96-162 96-162 96-162 96-162 96-162 96-162 96-162 96-162 96-162 96-162 96-162 96-162 AOGCC Individual Well Geological Materials Inventory DATA GR/CCL PLS GR/CCL-PERF GR/CCL-SETT DGR/RES-MD DGR/RES-TVD 7954 T DATA PLUS ~/8200-18705 %~200-8519 ~18300-18650 ~6888-7044 ~L~8224-18823 ~ s~o~ s~w .~-~~ s~s~.~s-~.~ M~ s~o~ s~w ..~-~ o-~o · MWD SRVY ~R~'SPERRY 0-16517. MWD SRVY ~PERRY 14839.38-16761. MULTI SHOT 10/10~yRODATA 60-15140. Page: 1 Date: 11/05/98 RUN RECVD 1 10/23/96 1 10/23/96 1 10/23/96 1 11/06/96 FINAL 03/26/97 FINAL 03/26/97 7 04/16/97 07/28/97 07/28/97 07/28/97 07/28/97 07/28/97 10-407 ~/COMPLETION DATE ~// ~-~//~/ DAILY WELL OPS R ~//~/%,/ TO /l/,,F/q~/,,,, Are dry ditch samples required? yes ~L~d received? Was the well cored? yes ~Analysis & description received? AreWell wellis inteStScompliancerequired?t~es ~ Received?~_y~-~n~- Initial COMMENTS 7/.2,¢??/ '?/2?/~' / / ~---~6' r'! I:~ I/1_ I flJ I~ To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs August 19, 1998 MPF-66A (R), AK-MM-60110 1 LDWG formatted LIS tape with verification listing. API~: 50-029-22697-01 H.,F.,ASE ACKNOWI.~I}GE i{ECEIPT BY SIGNING AND RE~G THE AIl'ACHED COPIES Oli' THE TRANSMITFAL LE~ TO THE A~ON OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIV'ED BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 9951945612 Sign Note: This Data replaces all previous MWD Digital Data for well (MPF-66A). 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing E]Alter Casing [] Repair Well [] Other Change out ESP 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM At effective depth 1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM At total depth 1176' NSL, 3026' EWL, SEC. 20, T14N, R10E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 43.45' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-66A 9. Permit Number / Approval No. 96-162 10. APl Number 50- 029-22697-01 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate Production Liner 18823 feet 7792 feet 18718 feet 7718 feet Size 80' 20" 8192' 9-5/8" Plugs (measured) Junk (measured) Cemented 250 sx Arcticset I (Approx.) 1675 sx PF 'E', 700 sx Class 'G' 18771' 7" 250 sx Class 'G' MD TVD 112' 112' 8223' 4506' 18799' 7775' Perforation depth: measured true vertical 18442'-18488', 18500'-18545' (Subsea) 7486' - 7517', 7526' - 7557' Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 17818' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL 14. Representative Dai .ly Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [--~ Copies of Logs and Surveys run [~ Oil I-1 Gas E] Suspended [] Daily Report of Well Operations 17. I hereby certify that the foregoing is true an/d correct to the best of my knowledge Title Staff Technical Assistant Casing Pressure /,/ Service Tubing Pressure Prepared By Name/Number: Date Jeanne L. Haas, 564-5225 Facility M Pt F Pad Progress Report Well MPF-66 Rig Nabors 5S Page Date 1 10 June 98 Date]Time 25 May 98 06:00-06:15 06:15-12:00 12:00-18:00 18:00-18:15 18:15-21:00 21:00-23:00 23:00-01:30 26 May 98 01:30-06:00 06:00-06:15 06:15-08:30 08:30-11:00 11:00-14:00 14:00-14:45 14:45-16:00 16:00-17:00 17:00-18:30 18:30-19:00 19:00-20:00 20:00-20:30 20:30-22:30 22:30-06:00 27 May 98 06:00-18:00 18:00-22:30 22:30-00:00 28 May 98 00:00-00:30 00:30-03:00 03:00-06:00 06:00-09:00 09:00-10:00 10:00-12:30 12:30-14:00 14:00-16:30 16:30-21:30 21:30-23:00 23:00-00:30 29 May 98 00:30-05:30 05:30-06:00 06:00-10:00 10:00-18:00 18:00-20:00 20:00-21:00 21:00-22:00 22:00-06:00 30 May 98 06:00-07:00 07:00-15:00 15:00-18:00 18:00-19:00 19:00-21:00 21:00-23:00 23:00-23:30 23:30-00:30 31 May 98 00:30-02:00 02:00-03:00 03:00-03:30 Duration 1/4 hr 5-3/4 hr 6hr 1/4 hr 2-3/4 hr 2hr 2-1/2 hr 4-1/2 hr 1/4 hr 2-1/4 hr 2-1/2 hr 3hr 3/4 hr 1-1/4 hr lhr 1-1/2 hr 1/2 hr lhr 1/2 hr 2hr 7-1/2 hr 12hr 4-1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 3hr 3hr lhr 2-1/2 hr 1-1/2 hr 2-1/2 hr 5hr 1-1/2 hr 1-1/2 hr 5hr 1/2 hr 4hr 8hr 2hr lhr lhr 8hr lhr 8hr 3hr lhr 2hr 2hr 1/2 hr lhr 1-1/2 hr lhr 1/2 hr Activity Held safety meeting Rig moved 65.00 % Rig moved 100.00 % Held safety meeting Bleed down well Installed Hanger plug Removed Xmas tree Installed BOP stack Held safety meeting Installed Tubing retrieval string Rig waited: Assessed situation Mixed and pumped 90.000 bbl of treatment Soak Displace treatment Soak Displace treatment Soak Displace treatment Soak Rigged up Service lines Pulled Tubing in stands to 10500.0 ft Pulled Tubing in stands to 1325.0 ft Pulled Tubing in stands to 0.0 ft Ran Tubing in stands to 3350.0 ft Circulated at 3350.0 ft Ran Tubing in stands to 8200.0 ft Circulated at 8200.0 ft Ran Tubing in stands to 8200.0 ft Ran Tubing in stands to 11000.0 ft Circulated at 11000.0 ft Ran Tubing in stands to 14700.0 ft Circulated at 14700.0 ft Singled in drill pipe to 17500.0 ft Circulated at 17500.0 ft Singled in drill pipe to 18707.0 ft Circulated at 18707.0 ft Laid down 0.0 ft of 3-1/2in OD drill pipe Laid down 4700.0 ft of 3-1/2in OD drill pipe Pulled Tubing in stands to 14000.0 ft Ran Tubing in stands to 0.0 ft Installed ESP Ran Tubing in stands to 0.0 ft Ran Tubing in stands to 8800.0 ft Ran Tubing in stands to 8800.0 ft Ran Tubing in stands to 16600.0 ft Ran Tubing in stands to 16600.0 ft Ran Tubing in stands to 16600.0 ft Ran Tubing in stands to 17866.0 ft Ran Tubing in stands to 17866.0 ft Installed Tubing hanger Installed Hanger plug Removed BOP stack Installed Manual master valve Tested Manual master valve Facility Date/Time O1 Jun 98 Progress Report M Pt F Pad Well MPF-66 Rig Nabors 5S Page Date 03:30-04:00 04:00-06:00 06:00-10:00 10:00-18:00 18:00-21:00 21:00-02:00 02:00-06:00 Duration 1/2 hr 2hr 4hr 8hr 3hr 5hr 4hr Activity Removed Hanger plug Rig moved 0.00 % Rig moved 0.00 % Rig moved 0.00 % Rig moved 0.00 % Rig moved 100.00 % Rig moved 100.00 % 2 10 June 98 .... STATE OF ALASKA ALASKA U,,_ AND GAS CONSERVATION COM,,,,SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: I--1Operation Shutdown [~Stimulate [] Plugging E~] Perforate [~ Pull Tubing []Alter Casing I--] Repair Well [~ Other Change out ESP 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM At top of productive interval 907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM At effective depth 1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM At total depth 1176' NSL, 3026' EVVL, SEC. 20, T14N, R10E, UM J5. Type of well: [~ Development [] Exploratory [] Stratigraphic []Service ORIGINAL 6. Datum Elevation (DF or KB) KBE = 43.45' 7. Unit or Property Name Milne Point Unit 8. Well Number MPF-66A 9. Permit Number / Approval No. 96-162 10. APl Number 50-029-22697-01 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 18823 feet 7792 feet 18718 feet 7718 feet Length Size Structural Conductor 80' 20" Surface 8192' 9-5/8" Intermediate Production 18771' 7" Liner Plugs (measured) Junk (measured) Cemented MD TVD 250 sx Arcticset I (Approx.) 112' 112' 1675 sx PF 'E', 700 sx Class 'G' 8223' 4506' 250 sx Class 'G' 18799' 7775' Perforation depth: measured true vertical 18442'-18488',18500'-18545' 7526'-7558',7566'-7597' Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 18157' Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [--I Copies of Logs and Surveys run [~ Daily Report of Well Operations 16. Status of well classifications as: [~ Oil I~ Gas I--] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Chip AIvord ~,'~¢'~ ~ ~-(~-.-'~ Title Senior Drilling Engineer Prepared By Name/Number: Date 7('27(?~ Kathy Campoamor, 564-5122 Form 10-404 Rev. 06/15/88 Submit In Duplicate SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPF-66A Rig Name: N-4ES AFE: 339049 Accept Date: 06/27/97 Spud Date: - Release Date: 07/05/97 Jun 27 1997 MIRU. Rig accepted 06/27/97 @ 0400 hrs. Check WHP 400 psi. Bleed gas. Install BPV. Spot tiger tank. Jun 28 1997 Set & berm tiger tank. WO SW. Attempt to test lines. Re-build valve. Re-test lines at 3000 psi. Good test. Bleed gas. Pump SW down tubing through pump. Call out SWS for tubing punch gun. Mix 40 bbl LCM pill per well program. RU SWS Request radio silence. Arm punch. PT lubricator. Start RIH. Pump gun down hole. Unable to get past 9300'. Cont to attempt to get deeper. No-go. POOH. RD SWS. Pump 40 bbl LCM pill & start displace with SW down annulus. Jun 29 1997 Spot LCM pill at 18100'. Monitor well. Install TWC. ND tree. NU BOP's. Test BOPE per AOGCC/SSD policy. Good test. AOGCC waived right to witness test-Chuck Sheve. Pull TWC. LD test jt. PU landing jt. Pull tubing hanger. Start POOH with 2-7/8" tubing & ESP assy. Finish POOH with tubing & ESP assy. Inspect & LD ESP assy. Jun 30 1997 RU slickline. RIH with GR/JB. Set down at 3550'. POOH. Recovered large piece of rubber. RIH. Set down at 3450'. POOH. Recovered sand, LCM. POOH. RD. MU BHA #1. Start TIH. Stop at 4050' & reverse tubing volume. Recover LCM. Slip 42' of drlg line. Cont TlR. Stop at 10000' & rev tubing vol. Recovered LCM. Cont TIH. Tag fill at 18464'. Fill across perfs. RU to circulate. Attempt to rev circ. Packing off. Circ cony @ 5bpm/2600psi. Recip pipe. Pump 20 bbl gel sweep & return to surface. Recover LCM. Attempt to rev circ. Had to circ conv, but was able to wash down to 18489'. Switch to reverse & clean up hole. Recip pipe while cleaning up. Attempt to make connection. Pipe stuck. Work stuck pipe. Cont to work pipe. Pump Iow/high vis sweep. Cont to work pipe. Unable to go down hole or up. 20K-150K. Got pipe to move up hole at 150K. LD 1 jt. Cont pulling, POOH. Got to 18434'. Again pulling at 150K. Tubing parted. Elevators popped open.Top of fish(TIW valve/HOWCO with half look-up) caught in 7" X 13-5/8" adp flange below BOP's. Secure well. WO on fishing hand. Page ] Jul 1 1997 WO fishing tools. MU FTA #1 - 4-1/8". Short catch. Latch fish & POOH with 13 ea 3- 1/2" jt of DP & a 12' piece of 2-7/8" tubing. MU FTA #2 - 2-7/8" OS. TIH to top of fish at 492' Latch fish. Work fish. Break circ. Swap hole over to EP Mud Lube. POOH. LD 21 jts 3-1/2" DP, fishing tools, & fish #2. POOH. LD 2-7/8" tubing. Jul 2 1997 Finish LD 2-7/8" tubing. LD DC from derrick. Run test plug. Change to 3-1/2" pipe rams. Test rams. Good test. Pull test plug. Load pipe shed with 3-1/2" DP. MU mule shoe. RIH with DP to 3500'. Rev circ with visc'd SW at 6bpm/600 psi. Cont to RIH with DP to 8000'. Cont RIH with DP. Load pipe shed with DP. Cont to RIH with DP. Cut 84', slip 42' drlg line. Cont RIH DP to 16900'. Rev circ with visc SW at 4bpm/1450psi. Large amount of LCM & sand in returns. Plugged flowline. Clear flowline. Cont with rev-out until clean. Cont RIH with DP. Jul 3 1997 Cont to RIH to top perforations at 18442'. Rev circ w/visc SW 5bpm/1300psi. Cont RIH to top of fill at 18641 '. Rev circ & wash fill from 18641' to hard bottom at 18711 '. Recovered mostly carbolite & LCM. Rev circ. Pump Hi vis sweep and rev to surf. Monitor well - well static. Start POOH with 3-1/2" DP. Finish POOH with DP & mule shoe. MU BHA #3. RIH to top of perfs at 18422'. Rev CBU-no solids in returns. Cont RIH to PBTD at 18711' (csg scraper at 18693'). Rev CBU (saw small amount of carbolite). POOH to 18698'. Cont to rev circ. Prep for csg wash. Recp pipe. Jul 4 1997 Rev circ. Mix & pump csg wash per well program. Displace with filtered sea water. Clean pits. Take on filtered sea water. RU MI filter van. Rev circ well through MI filtration van. Cont rev circ & filter SW. Samples of returned SW 128.0 NTU. Samples stay same after 2 complete reversals. Take sample to Baroid lab. Results of lab test 48mg/liter. PE's/centilift on Slope happy. Final results: 128.1 NTU. SW slightly cloudy, but clean. RD MI filter van. Monitor. Start POOH, LD 3-1/2" DP. Slip drlg line. Cont LD DP. Jul 5 1997 Finish LD DP, csg scraper & mill. Change out pipe rams to 2-7/8". Test at 2500psi, good. Finish loading pipe shed with 2-7/8" tubing. Finish strap/drift remainder of tubing. MU & service ESP assy. Start RIH with ESP compl. Cont RIH with ESP compl. 224 jts ran. Stop & change spool. Splice cable. Cont RIH w/ESP compl. Page 2 Jul 6 1997 Cont RIH w/ESP completion. Stop & change spool. Splice cable. Check cable, ok. Finish RIH w/ESP compl. MU hanger & landing jt. Splice in upper pig-tail. Check cable, ok. Land hange. RILDS. Install 2-way check. ND BOP's. NU tree. Test hanger & tree to 5000psi. Good test. Freeze protect tubing & annulus with diesel. Pull 2-way check. Check ESP cable, ok. Install BPV. Secure wellhead. Rig released 07/05/97 @ 2200 hrs. Page 3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil ~] Gas ~] Suspended [~ Abandoned I--] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 96-162 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22697-01 4. Location of well at surface ~'~;%~::::~ ~"~ i ~------'"~'~' 9. Unit or Lease Name 2165' NSL, 2608' WEb, SEC. 6, T13N, R10E, UM i .... '"':"-:::;'~-';v i Milne Point Unit At top of productive interval !~~ ~'i ~ t; 10. Well Number 907' Neb, 2941' EWL, SEC. 20, T14N, R10E, UM '- -,----¢,~-~ ,'Ii¢l~ MPF-66A At total depth !~ ~/¢: "=' ' ;¢!i'~~~ 11. Field and Pool 1176' NFL, 3026' EWL, SEC. 20, T14N, R10E, UM, %;~---~.---~_.~? Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands KBE = 43.45'I ADb 355016 12. Date Spudded 113. DateT.D. Reached 114. Date Comp., Susp., or Aband.l15. Water depth, ifoffshore 116. Nc. of Completions 9/21/96 9/28/96 11/4/96 N/A MSLI One 17. Total Depth (MD+TVD)18823 7792 FT,I1 8' Plug Back Depth (MD+TVD)I19' Directi°nal Survey J20' Depth where SSSV set 121' Thickness °f Permafr°st18718 7718 FTt [~Yes I--] No N/A MD 1800' (Approx.) 22. Type Electric or Other Logs Run Gyro, MWD, EMMS 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1 # H-40 32' 112' 24" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 31' 8223' 12-1/4" 1675 sx PF 'E', 700 sx Class 'G' 7" 26# L-80 28' 18799' 8-1/2" 250 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SiZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 2-7/8", 6.5#, L-80 18150' N/A MD TVD MD TVD 18442'-18488' 7526'-7558' 18500'-18545' 7566'-7597' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 75 bbls diesel Frac 53000# 16/20 Carbolite behind pipe 18442'-1R488'.18500'-1 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) November 24, 1996 t Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure ;CALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas ~v~, ~,~r~ ~c~.~, ~hips. ~nch.o. rsge Form 10-407 Rev. 07-01-80 Submit In Duplicate 129. 30. Geologic Markers Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top Kuparuk 'A' 18362' 7471' Top Kuparuk A1 18430' 7518' TMLV 18520' 7580' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ChipAIvord .Jj~.,_~.-L,.. ~. ~'¢-~.._ Title Senior Drilling Engineer Date MPF-66A 96-162 Prepared By Name/Number: Kathy Campoamor, 564-5122 Well Number Permit No. / Approval No. INSTRUCTIONS GEUERAk: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM $: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details-of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation' Flowing, Gas Lift, Rod Pump,_~.y~r ~C Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. il~ Form 10-407 Rev. 07-01-80 Facility Date/Time 19 Aug 96 20 Aug 96 21 Aug 96 22 Aug 96 23 Aug 96 24 Aug 96 25 Aug 96 Progress Report M Pt F Pad Well MPF-66PB 1 Rig Nabors 22E Page 1 Date 18June97 13:00-13:30 13:30-18:00 18:00-18:30 18:30-18:45 18:45-19:00 19:00-06:00 06:00-06:30 06:30-11:30 11:30-18:00 18:00-18:30 18:30-18:45 18:45-00:00 00:00-01:00 01:00-06:00 06:00-06:30 ~ 06:30-06:45 06:45-12:00 12:00-16:30 16:30-17:00 17:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-16:00 16:00-17:00 17:00-18:30 18:30-19:30 19:30-19:45 19:45-21:00 21:00-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-09:00 09:00-10:30 10:30-18:00 18:00-19:00 19:00-20:30 20:30-21:30 21:30-06:00 06:00-06:30 06:30-07:00 07:00-11:30 11:30-16:00 16:00-17:00 17:00-18:00 18:00-23:00 23:00-06:00 06:00-06:30 06:30-06:45 06:45-10:30 10:30-12:30 12:30-13:00 13:00-13:30 Duration 1/2 hr 4-1/2 hr 1/2 hr 1/4 hr 1/4 hr llhr 1/2 hr 5hr 6-1/2 hr 1/2 hr 1/4 hr 5-1/4 hr lhr 5hr 1/2 hr 1/4 hr 5-1/4 hr 4-1/2 hr 1/2 hr lhr 1/2 hr 11-1/2 hr 1/2hr 9-1/2 hr lhr 1-1/2 hr lhr 1/4 hr 1-1/4 hr 9hr 1/2 hr 1/2hr lhr lhr 1-1/2 hr 7-1/2 hr lhr 1-1/2 hr lhr 8-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 4-1/2 hr lhr lhr 5hr 7hr 1/2 hr 1/4 hr 3-3/4 hr 2hr 1/2 hr 1/2 hr Activity Held safety meeting Rig moved 30.00 % Held safety meeting Held drill (Spill) Rig moved 50.00 % Rig waited: Production facilities Held safety meeting Rig moved 100.00 % Rigged up Divertor Held safety meeting Held drill (Fire) Rigged up Top drive Serviced Block line Ran Drillpipe to 0.0 ft (5in OD) Held safety meeting Held drill (H2S) Ran Drillpipe to 0.0 ft (5in OD) Made up BI-IA no. 1 Tested Divertor Fill pits with Water based mud Held safety meeting Drilled to 1350.0 ft Held safety meeting Drilled to 2487.0 ft Circulated at 2487.0 ft Pulled out of hole to 300.0 ft Serviced Top drive Held drill (Kick while tripping) R.I.H. to 2487.0 ft Drilled to 3716.0 ft Held safety meeting Circulated at 3716.0 ft Pulled out of hole to 1500.0 ft Serviced Top drive R.I.H. to 3716.0 ft Drilled to 4752.0 ft Circulated at 4752.0 ft Pulled out of hole to 1500.0 ft R.I.H. to 4752.0 ft Drilled to 5973.0 ft Held safety meeting Circulated at 5973.0 ft Repaired Draw works Pulled out of hole to 0.0 ft Serviced Top drive Made up BHA no. 2 R.I.H. to 5973.0 ft Drilled to 6721.0 ft Held safety meeting Held drill (Spill) Drilled to 7241.0 ft Circulated at 7241.0 ft Pulled out of hole to 5950.0 ft R.I.H. to 7241.0 ft Facility Date/Time 26 Aug 96 27 Aug 96 28 Aug 96 29 Aug 96 30 Aug 96 31 Aug 96 M Pt F Pad Progress Report Well MPF-66PB 1 Rig Nabors 22E Page Date Duration Activity 13:30-04:00 04:00-06:00 06:00-06:30 06:30-07:00 07:00-09:00 09:00-11:00 11:00-14:00 14:00-14:15 14:15-17:00 17:00-19:00 19:00-00:00 00:00-01:30 01:30-02:00 02:00-06:00 06:00-06:30 06:30-11:00 11:00-12:00 12:00-14:00 14:00-17:00 17:00-20:30 20:30-22:00 22:00-00:00 00:00-03:00 03:00-06:00 06:00-06:30 06:30-11:00 11:00-23:00 23:00-01:00 01:00-03:00 03:00-06:00 06:00-06:30 06:30-07:00 07:00-08:30 08:30-09:30 09:30-11:30 11:30-15:30 15:30-16:30 16:30-17:00 17:00-18:00 18:00-20:30 20:30-21:00 21:00-21:30 21:30-21:45 21:45-06:00 06:00-06:30 06:30-11:30 11:30-13:00 14-1/2 hr 2hr 1/2 hr 1/2 hr 2hr 2hr 3hr 1/4 hr 2-3/4 hr 2hr 5hr 1-1/2 hr 1/2 hr 4hr 1/2 hr 4-1/2 hr lhr 2hr 3hr 3-1/2 hr 1-1/2 hr 2hr 3hr 3hr 1/2 hr 4-1/2 hr 12hr 2hr 2hr 3hr 1/2 hr 1/2 hr 1-1/2 hr lhr 2hr 4hr lhr 1/2 hr lhr 2-1/2 hr 1/2hr 1/2 hr 1/4 hr 8-1/4 hr 1/2 hr 5hr 1-1/2 hr Drilled to 8250.0 ft Circulated at 8250.0 ft Held safety meeting Circulated at 8250.0 ft Pulled out of hole to 1100.0 ft Serviced Block line R.I.H. to 8250.0 ft Held drill (Kick while tripping) Circulated at 8250.0 ft Pulled out of hole to 1100.0 ft Pulled BHA Serviced Casing handling equipment Held safety meeting Ran Casing to 2500.0 ft (9-5/8in OD) Held safety meeting Ran Casing to 8223.0 ft (9-5/8in OD) Rigged up Cement head Circulated at 8223.0 ft Mixed and pumped slurry - 491.000 bbl Circulated at 1828.0 ft Mixed and pumped slurry - 300.000 bbl Rigged down Casing handling equipment Rigged down Divertor Installed Casing spool Held safety meeting Rigged up BOP stack Tested BOP stack Serviced Bell nipple Made up BHA no. 3 Repaired Draw works Held safety meeting Repaired Draw works Made up BHA no. 3 R.I.H. to 1828.0 ft Drilled installed equipment - DV collar R.I.H. to 8135.0'ft Circulated at 8135.0 ft Tested Casing Circulated at 8135.0 ft Drilled installed equipment - Landing collar Circulated at 8270.0 ft Performed formation integrity test Held drill (Fire) Drilled to 9066.0 ft Held safety meeting Drilled to 9779.0 ft Circulated at 9779.0 ft 13:00-18:00 18:00-19:00 19:00-23:00 23:00-06:00 06:00-06:30 06:30-06:45 06:45-22:30 5 hr Pulled out of hole to 0.0 ft 1 hr Made up BHA no. 4 4 hr R.I.H. to 9779.0 ft 7 hr Drilled to 10389.0 ft 1/2 hr Held safety meeting 1/4 hr Held drill (Spill) 15-3/4 hr Drilled to 12363.0 ft 2 18 June 97 Facility Date/Time 01 Sep 96 02 Sep 96 03 Sep 96 04 Sep 96 05 Sep 96 06 Sep 96 M Pt F Pad Progress Report Well MPF-66PB 1 Rig Nabors 22E Page Date Duration Activity 22:30-00:00 00:00-01:30 01:30-06:00 06:00-06:30 06:30-10:00 10:00-11:00 11:00-15:00 15:00-06:00 06:00-06:30 06:30-12:00 12:00-13:30 13:30-14:30 14:30-14:45 14:45-15:30 15:30-06:00 06:00-06:30 06:30-06:45 06:45-01:45 01:45-02:00 02:00-04:00 04:00-06:00 06:00-06:30 06:30-11:00 11:00-12:30 12:30-12:45 12:45-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-06:00 06:00-06:30 06:30-10:30 10:30-12:30 12:30-15:30 15:30-16:30 16:30-18:00 18:00-18:30 18:30-20:30 20:30-21:00 21:00-22:00 22:00-00:00 00:00-04:30 04:30-04:45 04:45-05:15 05:15-06:00 06:00-06:30 06:30-18:00 1-1/2 hr 1-1/2 hr 4-1/2 hr 1/2 hr 3-1/2 hr lhr 4hr 15hr 1/2 hr 5-1/2 hr 1-1/2 hr lhr 1/4 hr 3/4 hr 14-1/2 hr 1/2 hr 1/4 hr 19hr 1/4 hr 2hr 2hr 1/2 hr 4-1/2 hr 1-1/2 hr 1/4 hr 3-1/4 hr lhr lhr 1/2hr 11-1/2 hr 1/2 hr 4hr 2hr 3hr lhr 1-1/2 hr 1/2 hr 2hr 1/2 hr lhr 2hr 4-1/2 hr 1/4 hr 1/2 hr 3/4 hr 1/2 hr 11-1/2 hr Circulated at 12363.0 ft Pulled out of hole to 8223.0 ft Repaired Draw works Held safety meeting Repaired Draw works Serviced Block line R.I.H. to 12363.0 ft Drilled to 13911.0 ft Held safety meeting Drilled to 14446.0 ft Circulated at 14446.0 ft Pulled out of hole to 12350.0 ft Held drill (Kick while tripping) Ik.I.H. to 14446.0 ft Drilled to 15512.0 ft Held safety meeting Held drill (H2S) Drilled to 16517.0 ft Held safety meeting Circulated at 16517.0 ft Pulled out of hole to 141450.0 ft Held safety meeting Pulled out of hole to 488.0 ft Pulled BHA Held safety meeting Tested BOP stack Serviced Top drive Repaired Top drive Held safety meeting Repaired Top drive Held safety meeting Repaired Top drive Made up BHA no. 5 R.I.H. to 8220.0 ft Serviced Block line Singled in drill pipe to 11250.0 ft Held safety meeting R.I.H. to 15901.0 ft Reamed to 15950.0 ft R.I.H. to 16519.0 ft Circulated at 16519.0 ft Circulated at 16519.0 ft Flow check Pulled out of hole to 15950.0 ft Reamed to 15950.0 ft Held safety meeting Jarred stuck pipe at 16099.0 ft 18:00-18:30 18:30-18:45 18:45-19:30 19:30-21:30 21:30-22:00 22:00-22:30 22:30-05:00 1/2 hr 1/4 hr 3/4 hr 2hr 1/2hr 1/2 hr 6-1/2 hr Held safety meeting Held drill (Fire) Worked stuck pipe at 16099.0 ft Circulated at 16099.0 ft Pumped out of hole to 15900.0 ft Held safety meeting Pulled out of hole to 0.0 ft 3 18 June 97 Facility Date/Time 07 Sep 96 O8 Sep 96 09 Sep 96 10 Sep 96 11 Sep 96 12 Sep 96 13 Sep 96 Progress Report M Pt F Pad Well MPF-66PB 1 Rig Nabors 22E Page 4 Date 18June97 05:00-06:00 06:00-06:30 06:30-06:45 06:45-09:00 09:00-09:30 09:30-10:30 10:30-11:00 11:00-12:00 12:00-18:00 18:00-18:30 18:30-18:45 18:45-19:00 19:00-21:30 21:30-06:00 06:00-12:00 12:00-18:00 18:00-22:00 22:00-00:30 00:30-06:00 06:00-08:00 08:00-09:00 09:00-11:00 11:00-20:30 20:30-23:30 23:30-00:30 00:30-02:00 02:00-06:00 06:00-06:45 06:45-11:00 11:00-12:00 12:00-13:30 13:30-16:00 16:00-17:00 17:00-19:30 19:30-21:00 21:00-06:00 06:00-09:30 09:30-15:00 15:00-18:30 18:30-00:30 00:30-01:45 01:45-06:00 06:00-06:45 06:45-08:00 08:00-09:30 09:30-10:30 10:30-13:00 13:00-14:00 14:00-17:00 17:00-18:30 18:30-19:30 19:30-06:00 06:00-06:30 06:30-06:45 Duration lhr 1/2hr 1/4 hr 2-1/4 hr 1/2 hr lhr 1/2 hr lhr 6hr 1/2 hr 1/4 hr 1/4 hr 2-1/2 hr 8-1/2 hr 6hr 6hr 4hr 2-1/2 hr 5-1/2 hr 2hr lhr 2hr 9-1/2 hr 3hr lhr 1-1/2 hr 4hr 3/4 hr 4-1/4 hr lhr 1-1/2 hr 2-1/2 hr lhr 2-1/2 hr 1-1/2 hr 9hr 3-1/2 hr 5-1/2 hr 3-1/2 hr 6hr 1-1/4 hr 4-1/4 hr 3/4 hr 1-1/4 hr 1-1/2 hr lhr 2-1/2 hr lhr 3hr 1-1/2 hr lhr 10-1/2 hr 1/2 hr 1/4 hr Activity Made up BHA no. 6 Held safety meeting Held drill (Spill) Made up BHA no. 6 R.I.H. to 450.0 ft Serviced Block line R.I.H. to 2000.0 ft Serviced Top drive R.I.H. to 15000.0 ft Held safety meeting Held drill (Kick while tripping) R.I.H. to 15620.0 ft Circulated at 15620.0 ft Jarred stuck pipe at 15638.0 ft Jarred stuck pipe at 15638.0 ft Conducted electric cable operations Conducted electric cable operations Circulated at 15638.0 ft Pulled out of hole to 4000.0 ft Pulled out of hole to 300.0 ft Pulled BHA Made up BHA no. 7 R.I.H. to 15644.0 ft Circulated at 15644.0 ft Batch mixed slurry - 68.000 bbl Pulled out of hole to 13300.0 ft Circulated at 13300.0 ft Circulated at 13300.0 ft Pulled out of hole to 1037.0 ft Serviced Top drive Pulled BHA Made up BHA no. 8 Serviced Top drive pipe handler R.I.H. to 8223.0 ft Circulated at 8223.0 ft R.I.H. to 12500.0 ft R.I.H. to 14023.0 ft Reamed to 14929.0 ft Circulated at 14929.0 ft Pulled out of hole to 300.0 ft Pulled BHA Worked on BOP - All functions Serviced Top drive Made up BHA no. 9 R.I.H. to 2000.0 ft Serviced Travelling block R.I.H. to 8200.0 ft Circulated at 8223.0 ft R.I.H. to 12699.0 ft Repaired Block line Repaired Block line Repaired Block line Held safety meeting Held drill (H2S) Facility Date/Time 14 Sep 96 15 Sep 96 16 Sep 96 M Pt F Pad Progress Report 06:45-10:00 10:00-11:00 11:00-12:00 12:00-15:30 15:30-16:00 16:00-18:00 18:00-18:30 18:30-19:30 19:30-21:00 21:00-00:00 00:00-06:00 06:00-06:30 06:30-06:45 06:45-18:00 18:00-18:30 18:30-18:45 18:45-06:00 06:00-06:30 06:30-08:00 08:00-09:30 09:30-10:00 10:00-10:30 10:30-11:00 11:00-11:15 11:15-18:00 18:00-18:30 18:30-18:45 18:45-06:00 06:00 Duration 3-1/4 hr lhr lhr 3-1/2 hr 1/2 hr 2hr 1/2 hr lhr 1-1/2 hr 3hr 6hr 1/2 hr 1/4 hr 11-1/4 hr 1/2 hr 1/4 hr 11-1/4 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2hr 1/2 hr 1/2 hr 1/4 hr 6-3/4 hr 1/2 hr 1/4 hr 11-1/4 hr Well MPF-66PB 1 Rig Nabors 22E Activity Repaired Crown block Repaired Block line Circulated at 12699.0 ft Pulled out of hole to 8200.0 ft Repaired Crown block R.I.H. to 11500.0 ft Held safety meeting R.I.H. to 14139.0 ft Reamed to 14929.0 ft Circulated at 14929.0 ft Drilled to 15074.0 ft Held safety meeting Held drill (Fire) Drilled to 15436.0 ft Held safety meeting Held drill (Kick while drilling) Drilled to 15911.0 ft Held safety meeting Drilled to 16007.0 ft Circulated at 16007.0 ft Pulled out of hole to 14500.0 ft Serviced Top drive R.I.H. to 16007.0 ft Held drill (Spill) Drilled to 16141.0 ft Held safety meeting Held drill (Abandonment) Drilled to 16441.0 ft Drilled to 16441.0 ft (cont...) Page Date 5 18 June 97 Facility Date/Time 16 Sep 96 17 Sep 96 18 Sep 96 19 Sep 96 20 Sep 96 21 Sep 96 M Pt F Pad Progress Report Well MPF-66 Rig Nabors 22E Page Date Duration Activity 06:00-06:30 06:30-06:45 06:45-18:00 18:00-18:30 18:30-18:45 18:45-22:30 22:30-00:00 00:00-01:00 01:00-06:00 06:00-06:30 06:30-07:00 07:00-09:30 09:30-11:00 11:00-16:00 16:00-18:00 18:00-18:30 18:30-18:45 18:45-00:00 00:00-02:00 02:00-02:30 02:30-06:00 06:00-06:30 06:30-08:00 08:00-09:30 09:30-23:00 23:00-02:00 02:00-04:30 04:30-06:00 06:00-06:30 06:30-10:00 10:00-10:30 10:30-12:30 12:30-16:00 16:00-18:00 18:00-18:15 18:15-21:30 21:30-22:30 22:30-23:00 23:00-00:30 00:30-02:00 02:00-03:30 03:30-04:30 1/2 hr 1/4 hr 11-1/4 hr 1/2 hr 1/4 hr 3-3/4 hr 1-1/2 hr lhr 5hr 1/2 hr 1/2hr 2-1/2 hr 1-1/2 hr 5hr 2hr 1/2 hr 1/4 hr 5-1/4 hr 2hr 1/2hr 3-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 13-1/2 hr 3hr 2-1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 3-1/2 hr 2hr 1/4 hr 3-1/4 hr lhr 1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr Held safety meeting Held drill (H2S) Drilled to 16669.0 ft Held safety meeting Held drill (Fire) Drilled to 16764.0 ft Circulated at 16764.0 ft Pulled out of hole to 16006.0 ft Jarred stuck pipe at 16176.0 ft Held safety meeting Worked stuck pipe at 16350.0 ft Circulated at 16350.0 ft Reamed to 16764.0 ft Circulated at 16764.0 ft Pulled out of hole to 16100.0 ft Held safety meeting Held drill (Spill) Worked stuck pipe at 16165.0 ft Circulated at 16165.0 ft Reamed to 16167.0 ft Circulated at 16167.0 ft Held safety meeting Pumped out of hole to 15900.0 ft Circulated at 15900.0 ft Jarred stuck pipe at 15900.0 ft Fished at 15900.0 ft Worked stuck pipe at 15900.0 ft Pumped out of hole to 14000.0 ft Held safety meeting Pulled out of hole to 0.0 ft Removed Wear bushing Serviced Iron roughneck Ran Drillpipe in stands to 8223.0 ft Serviced Block line Held safety meeting Ran Drillpipe in stands to 15620.0 ft Circulated at 15620.0 ft Mixed and pumped slurry - 36.000 bbl Pulled Drillpipe in stands to 13740.0 ft Circulated at 13740.0 ft Pulled Drillpipe in stands to 8950.0 ft Circulated at 8950.0 ft 04:30-05:00 05:00-06:00 06:00-06:30 06:30-13:00 13:00-15:00 15:00-16:30 16:30-20:30 20:30-03:00 03:00-04:00 04:00-06:00 06:00-06:30 06:30-11:00 1/2hr lhr 1/2 hr 6-1/2 hr 2hr 1-1/2 hr 4hr 6-1/2 hr lhr 2hr 1/2 hr 4-1/2 hr Mixed and pumped slurry - 56.000 bbl Pulled Drillpipe in stands to 7100.0 fl Held safety meeting Circulated at 7100.0 ft Pulled Drillpipe in stands to 1082.0 ft Laid down 1082.0 fl of Drillpipe Tested BOP stack Repaired Annular preventor Rigged up Drillstring handling equipment Made up BI-IA no. l0 Held safety meeting R.I.H. to 7945.0 ft 1 18 June 97 Facility M Pt F Pad Progress Report Well MPF-66 Rig Nabors 22E Page Date 2 18 June 97 Date/Time 11:00-12:00 Duration lhr Activity Drilled cement to 8223.0 ft Facility Date/Time 21 Sep 96 22 Sep 96 23 Sep 96 24 Sep 96 25 Sep 96 26 Sep 96 27 Sep 96 28 Sep 96 M Pt F Pad 12:00-19:00 19:00-20:00 20:00-20:15 20:15-06:00 06:00-06:30 06:30-07:00 07:00-08:30 08:30-11:30 11:30-13:00 13:00-14:00 14:00-14:15 14:15-05:30 05:30-06:00 06:00-06:30 06:30-07:45 07:45-08:00 08:00-09:45 09:45-10:00 10:00-11:00 11:00-12:30 12:30-05:45 05:45-06:00 06:00-06:30 06:30-08:00 08:00-09:30 09:30-10:30 10:30-11:30 11:30-06:00 06:00-06:30 06:30-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-05:45 05:45-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-08:00 08:00-08:15 08:15-06:00 06:00-06:30 06:30-11:30 11:30-14:00 14:00-19:30 19:30-22:00 22:00-23:00 23:00-01:30 01:30-02:30 02:30-05:45 05:45-06:00 06:00-06:30 06:30-14:30 14:30-14:45 Duration 7hr lhr 1/4 hr 9-3/4 hr 1/2 hr 1/2 hr 1-1/2 hr 3hr 1-1/2 hr lhr 1/4 hr 15-1/4 hr 1/2 hr 1/2 hr 1-1/4 hr 1/4 hr 1-3/4 hr 1/4 hr lhr 1-1/2 hr 17-1/4 hr 1/4 hr 1/2 hr 1-1/2 hr 1-1/2 hr lhr lhr 18-1/2 hr 1/2 hr 1-1/2 hr lhr lhr lhr 18-3/4 hr 1/4 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/4 hr 21-3/4 hr 1/2 hr 5hr 2-1/2 hr 5-1/2 hr 2-1/2 hr lhr 2-1/2 hr lhr 3-1/4 hr 1/4 hr 1/2hr 8hr 1/4 hr Progress Report Well MPF-66A Rig Nabors 22E Page Date Activity Drilled to 9014.0 ft Repaired Top drive Held safety meeting Drilled to 10153.0 ft Held safety meeting Drilled to 10247.0 ft Circulated at 10247.0 ft Pulled out of hole to 8223.0 ft Serviced Top drive R.I.H. to 10247.0 ft Held drill (Kick while drilling) Drilled to 11840.0 ft Circulated at 11840.0 ft Held safety meeting Circulated at 11840.0 ft Held drill (H2S) Pulled out of hole to 8223.0 ft Held drill (Kick while tripping) Serviced Block line R.I.H. to 11840.0 ft Drilled to 13369.0 ft Held drill (Fire) Held safety meeting Drilled to 13827.0 ft Circulated at 13827.0 ft Pulled out of hole to 11800.0 ft R.I.H. to 13827.0 ft Drilled to 15429.0 ft Held safety meeting Drilled to 15524.0 ft Circulated at 15524.0 ft Pulled out of hole to 13800.0 ft R.I.H. to 15524.0 ft Drilled to 16851.0 ft Held drill (Spill) Held safety meeting Circulated at 16681.0 ft Pulled out of hole to 15550.0 ft R.I.H. to 16851.0 ft Held drill (Fire) Drilled to 17728.0 ft Held safety meeting Drilled to 18100.0 ft Circulated at 18100.0 ft Pulled out of hole to 8223.0 ft Serviced Block line Set Retrievable packer at 45.0 ft with 0.0 psi Tested BOP stack Set Retrievable packer at 45.0 ft with 0.0 psi R.I.H. to 18100.0 ft Held drill (Kick while tripping) Held safety meeting Drilled to 18823.0 ft Held drill (Spill) 1 18 June 97 Facility Date/Time 29 Sep 96 30 Sep 96 01 Oct 96 M Pt F Pad Progress Report Well MPF-66A Rig Nabors 22E Page Date Duration Activity 14:45-17:00 17:00-18:00 18:00-19:30 19:30-21:30 21:30-22:15 22:15-23:00 23:00-01:30 01:30-03:00 03:00-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-13:30 13:30-14:30 14:30-16:00 16:00-06:00 06:00-06:30 06:30-13:00 13:00-16:30 16:30-19:00 19:00-19:30 19:30-21:00 21:00-22:00 22:00-23:00 23:00-02:00 02:00-04:00 04:00-06:00 06:00-06:30 06:30-21:00 21:00-23:00 23:00-23:30 23:30-06:00 2-1/4 hr lhr 1-1/2 hr 2hr 3/4 hr 3/4 hr 2-1/2 hr 1-1/2 hr 3hr 1/2 hr 4hr lhr 2hr lhr 1-1/2 hr 14hr 1/2 hr 6-1/2 hr 3-1/2 hr 2-1/2 hr 1/2 hr 1-1/2 hr lhr lhr 3hr 2hr 2hr 1/2 hr 14-1/2 hr 2hr 1/2 hr 6-1/2 hr Circulated at 18823.0 ft Pulled out of hole to 16000.0 ft R.I.H. to 18823.0 ft Circulated at 18823.0 ft Pulled out of hole to 17500.0 ft R.I.H. to 18823.0 ft Circulated at 18823.0 ft Dropped EMMS survey barrel Pulled out of hole to 10000.0 ft Held safety meeting Pulled out of hole to 1100.0 ft Serviced Block line Pulled BHA Serviced Top ram Rigged up Casing handling equipment Ran Casing to 12000.0 ft (7in OD) Held safety meeting Ran Casing to 18799.0 ft (7in OD) Circulated at 18799.0 ft Mixed and pumped slurry - 51.000 bbl Tested Casing Serviced Casing handling equipment Installed Wellhead integral components Serviced Top ram Rigged down BOP stack Rigged up Surface test tree Tested All tree valves Held safety meeting Laid down 15500.0 ft of Drillpipe Rigged down High pressure lines Held safety meeting Rig moved 25.00 % 2 18 June 97 MILNE POINT, ALASKA TO: Hendrix/Stevens FROM: Matthew Linder WELL# IMPU- F66a Main Category: IDrillin~l Sub Category: Ilnitial Perforation lof "A" sands. Operation Date: ~1 0/1 0/96 MPU FILE COPY Date: I10/11/96 Objective: Perforate the Kuparuk "A" sands using Atlas 3-3/8" jumbo jet charges, 6 SPF,60° phasing. Entrance holes .76', 22 gm, total target penetration 6.4". Operation: Held onsite safety meeting. Rigged up atlas wireline. Pressure tested lubricator to 300 psi. REFERENCE LOG: ATLAS WIRELINE GR/CCL MARKED LINE DATED 10/9/96. Gun run #1, RIH and made tie in pass past RA marker at 18212'. Made +24' depth correction. Dropped down to 18650' and flagged line. Attempted to Icg entire per[ interval but started pulling weight at 18302' (3700~) stopped logging and dropped back to flag. Made +1' depth correction. Logged up @ 30 FPM into position, Log off by 1'. Decided to relog so to get a feel for line stretch and tool drag for upcoming passes. Dropped back to flag. Made +.5' correction (split the hair). Relog Icg on depth. Fired per[ gun perforating interval from 18521'-18545'. Lost signal to PFC. No drag pulling out of hole. All but one charge fired. Well head pressure 440 psi. Trouble shoot tool sting, found bad swivel. Changed out swivel. Gun run #2, RIH to flag at 18650'. Logged up at 30 fpm, pulling weight at 18550', stopped. Dropped back to flag. Made +1' correction and relogged. Log on depth. Fired perf gun per[orating interval from 18500'-18521'. Logged off. No drag coming out of hole. All shots fired. Gun run #3, RIH to flag at 18650'. Logged up at 30 fpm, pulled weight at 18540' but pulled free. Continued logging. Log on depth. Fired perf gun perforating interval from 18464'-18488'. Lost signal to PFC. POOH. All shots fired. Trouble shoot tool string, found bad swivel. Changed out swivel. Gun run #4, RIH to flag at 18650'. Logged up at 30 fpm, smooth run, no drag. Made +1' correction. Tie in Icg pretty ratty from all the other per[ holes. Gamma rays close but collars undeterminable. Dropped back and relogged. Will shot off gamma ray. Log on depth. Fired per[ gun perforating interval at 18442'-18464'. Lost signal to PFC again. POOH. All shots fired. Trouble shoot tool string, found bad swivel again. Static survey, Had to switch to 1-11/16" tool string because we are currently out of 3- 3/8" swivels. RIH with the HP to 8519', tools quit falling. Made several attempts at getting deeper with out luck. Called Bill Hill and decided to take survey at this depth. After one hour, bottom hole pressure is stable at 2379 psi at 101°. HP tool # 152902 calibration date of tool 4/14/96 Conclusion: Perforated Kuparuk "A" sands from 18442'-18488' & 18500'-18545'. Final shut in pressure 550 psi. One perf charge did not fire on gun run #1. BP EXPLORATION (ALASKA) INC. Milne Point Unit TO: S. Rossberg! Bill Hill FROM: Dan Robertson / Mark O'Malley DATE: 10123/96 RE: MP F-66 :DATA FRAC AND FRAC SERVICE CO'S.: DS, Peak, JOB SUMMARY MPU FILE COPY Pumped 50 bbl injection test at 50 bpm, 4550 psi followed by 300 bbl data frac as per program. Data transmitted to town real time. Pumped frac job as per redesign based on data frac analysis. 53 M# of 16/20 carbolite placed behind pipe. Wellbore left with sand above perfs approx. 93 M#., 10.3 ppg approx, brine and Diesel 8,000' to surf.. 10 F LCTD for brine. INJECTIVITY TEST Design Rate, Bbls Max Rate, Final STP, ISIP, NWB Treat grad, BPM Pumped bpm psi PSI friction, psi psi/ft 50 50 50 4550 1960 850 0.68 DATA FRAC Bbls Bbls XL Time XL gel Final STP, ISIP, psi NWB Treat grad, Pumped gel to on perfs psi friction, psi/ft Perfs psi 300 282 7.1 4050 2250 850 0.74 FRA C Sand Lead prop Tail prop Design total Tresaver pumped, behind behind behind Liner rubber left Job was M# pipe, M# pipe, M# pipe, M# Sand, M# in hole? /size /size Screened I 49 53.2 95.8 N/A out 16/20 NA 10/29/96 3:13 PM DATA FRAC & FRAC SENT VIA MICROSOFT MAIL TIME I RATEBPM PsIG IPS GI BBL CUM BBL PUk. .NG SUMMARY COMMENTS Ft of Estimated Final ISIP, psi ISlP Incr Pad TSO, TSO, sand in sand top STP, over fraction design, Nolte P i p e psi datafrac min P lot 4,040 14,400 6,000 2247 289 N/A N/A Operational problems The job was delayed two times because of proximity of 4-ES on F-58. Had some trouble with the link up between the unit at Milne and the Anch. office. No trouble during the rig up. The job screened out Comments Because of the large amount of fmc sand left in the well bore and the depth of the perforations 4-ES will do the clean out and then run the ESP completion. DATE/TIME OPERATIONS SUMMARY 1 0~23/96 DATA FRAC 0700 MIRU fmc, vac, pump. Pre job operational and safety meeting. AMBIENT=(-9), WIND--5 MPH. SIWHP= 370 ,OAP= 350. Pressure test at 6500 psi. 10/23/96 FRAC PUMP FRAC AS PER REVISED TSO SECURE WELL. SIWHP= 200. lAP= NA. OAP= 421. RDMO frac, vac, pump. PUMPING SUMMARY TIME RATE ANNP WHP STAGE CUM COMMENTS' BPM PSIG PSIG BBL BBL DATA FRAC DISPLACEMENT = 706 bbls to top perf · · 0/50 350 370 0 Est rate/injection test with seawater 1100 50 500 4550 50/0 50 sd for ISIP=1960 psi, FG=0.68 psi/ft 1104 0/50 350 1600 50/0 Stg 40# XL gel pad 1106 50 530 4140 150 1108 50 550 4200 300/0 350 Stage seawater flush. 1113 50 564 4260 150 :1117 50/40 590 4290 304 654 Reduce rate to 40 bpm (100bbls from perfs) 1119 40 600 4030 1 00 754 pad at perfs 1121 39.4 610 4250 200 854 1124 40.12 604 4100 300 954 1125 40.5 604 4050 384 1038 SD. ISIP= 2250 psi. FG= 0.74 psi/ft. Monitor pressure. FRAC 1335 0/40 359 990 0 1038 Stage pad 1340 39.8 478 3798 150 1344 40.3 489 3790 376/0 1414 Stage 1 ppg 16/20 CL 1347 40.3 500 3850 100 1514 1350 40.1 500 3904 231/0 1645 Stage 2 ppg 35/0 1680 3 ppg. 45/O 1725 4 ppg 1354 40 500 3880 53/0 1778 5 ppg, pad on pe~s~aL 59/0 1837 6 ppg 1358 40 470 3go0 63/0 I gOO 7 ppg 66/0 1966 8 ppg 67/0 2033 g ppg ?~c~Orag. r4 .... 1402 40.1 440 3650 69/0 2102 10 ppg, 1 ppg on peds at 2120 cum PUMPING SUMMARY TIME RATE ANNP WHP STAGE CUM COMMENTS BPM PSIG PSIG BBL BBL 1405 40 430 3550 165/0 2275 Stage flush 10.3 ppg NaCIBr with 10 bbls dsl 1409 40 41 8 3927 11 0 2385 3 ppg on perfs 1411 40 403 3853 200 5 ppg on perfs 1414 37 510 4000 305 2579 6 ppg on perfs, screen out at 6000 psi. 53.2 M# behind pipe, 96 M# in pipe. approx 20 bbls dsl in pdor to screenout. 1415. 2583 Shut down begin to rig down DS Page 5 FLUIDS PUMPED DOWNHOLE INJ TEST& DATA FRAC: 1038 Bbls FRAC: 1545 Bbls ****TOTAL FLUIDS PUMPED DOWN HOLE LOAD VOLUME 3O 120 150 Diesel to press test and freeze protect Diesel to gray diesel tank Total Diesel IINONE PETREDAT WINDOW GEL QUALITY CONTROL CHECK SEA H20 SEA H20 40# GEL 40# GEL PIPE XL XL pH TEMP pH VISCOSITY TIME TIME pH DF/FRAC 7.65 100 7.25 33 17.7 min 2'20 8.7 FLUID ADDITIVES DS YF140D FLUID SYSTEM with 9.2 gal/ Mgal J877 guar, I gal/ Mgal F-75 surfactant, 0.3 gal/ Mgal M275 bactericide, 5 gal/ Mgal J899 activator with 40 #/MGAL adomite regain in data frac and pad. No ESL. SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: MPF-66A Rig Name: N-4ES AFE: 347025 Accept Date: 10/25/96 Spud Date: - Release Date: 11/04/96 Oct 26 1996 MIRU. Rig accepted 10/25/96 @ 1100 hrs. Check well for pressure-RBP tested to 2000 psi by production. ND frac tree. NU DSA, NU BOP stack. Change rams. Test BOP, test all rams, lines & valves. Test Hydril, kelly, upper & lower kelly valve,TIW & IBOP. Witness of test waived by Chuck Scheve of AOGCC. RD test lines, install wear bushing. MU Baker RBP retrieving tool. TIH, PU 3-1/2" DP to 2000'. Circ out freeze protection. Cont TIH picking up 3-1/2" DP. Oct 27 1996 TIH to 6886' picking up 3-1/2" DP. Circ & balance brine at 10.2 ppg. TIH tag RBP @ 6945', pull free with 10K over pull. CBU with brine--no gas or oil. POOH, LD RBP & retrieving tool. MU 6-1/8" bit, TIH to 6945'. Circ & viscosify brine with Xanvis. TIH, PU 3-1/2" DP to 7946'. CBU. TIH, PU DP to 8040'. PU kelly, wash 8040'-8488', CBU at 8488'. Carbolite returns. TIH, PU DP to 9357'. CBU, small amount of carbolite in returns. TIH, PU DP to 10355'. CBU, rotate & reciprocate. Carbolite increasing in returns. Change out swab on mud pump. Oct 28 1996 Finish changing liner & swab on mud pump. Circ, rotating & reciprocating at 10355'--Iot of frac sand in returns. Wash & ream 10355' to 11072'. Frac sand decreased in shaker. TIH, PU DP 11072'-11574'. CBU @ 11574', rotating & reciprocating. TIH, PU DP 11574'-12478'. CBU @ 12478', rotating & reciprocating. TIH, PU DP 12478'-13420'. CBU @ 13420', rotating & reciprocating until hole clean. TIH, PU DP 13420'-14008'. Circ @ 14008', rotating & reciprocating. Steady amount of carbolite over shakers. Page ! Oct 29 1996 Cont circ at 14008'. Swab out on pump, POOH 5 stds. Change out two swab & one liter on mud pump. TIH to 14008'. Cont circ out sand at 14008'. TIH, PU DP to 14489'. Circ out sand at 14489', rotate & recip pipe. TIH, PU DP to 15045'. CBU. TIH, PU DP to 15534'. CBU @ 15534', steady amount of sand in shaker. TIH, PU DP to 16289'. Change shaker screens. CBU @ 16289', rotate & recip. TIH, PU DP to 17052'. Circ out sand to 17052', rotate & recip. TIH, PU DP to 18030'. Circ out sand at 18030'. TIH, PU DP. Tag up on firm fill at 18092'. Wash & ream 18092'-18217'. Circ out sand at 18217'. Oct 3O 1996 Wash & ream 18217' to PBTD. CBU, rotate & recip. Pump high vis sweep around, no increase in sand returns with sweep. Pump 2nd high vis sweep around, rotate & recip as much as possible. Engine over heating-no notice of increase in return sand with sweep. Circ, work pipe while circ. Cannot circ at higher rates & rotate due to engine over heating. Sand decreasing in shakers. Change shaker screens. Cont circ. Steady amount of fine sand across screens. Sand content on brine. Fine sand continues to be circ down hole. RU & rev circ. Oct 31 1996 Rev circ @ 18706'. Rev 40 bbl Zanvis sweep & 40 bbl dirt magnet & 20 bbl Zanvis sweep & follow with clean filtered brine. Monitor returns unable to clean brine. Rec pipe & clean pits. POOH with 3-1/2" DP. Cut drlg line. Cont to POOH. Space out 7" csg scraper & RIH with same. Slip drlg line. Cont TIH with scraper. Nov 1 1996 Cont to TIH with BHA #2, tag fill @ 18695'. Rev circ & recip with Baroid unit. Bottoms up. Loaded up flow line & filter unit with formation sand. Clean flow. Line & cont circ & filter returns. TOH to top of perfs & clean pits. Surface lines & attempt to begin filtering fluid, no results. Order new brine system. Take on 9.8 ppg brine & hook up HB&R for diesel wash. RIH to 18680'. Pump diesel, dirt magnet & csg wash. Repair failes stand pipe valve. Cont with csg wash sweeps & follow with clean filtered brine to displace complete system. Filter brine with Baroid filter system. Ram on Baroid filter unit failed dress & repair same. Cont to filter brine. Nov 2 1996 Circ & filter brine with Baroid & recip pipe. POOH to 18400' & cont filtering brine & run Zanvis sweeps. RIH to 18680' & filter brine with Baroid unit & run Zanvis sweeps. Circ & filter brine until no solids in fluid & NTU down below NTU count. POOH, LD DP. Page 2 Nov 3 1996 Cont to lay down DP. Clean floor & RU to run ESP compl. Set test plug & clean stack. Change rams in BOP & test same, pull plug. MU & service ESP assy. RIH with ESP assy on 2-7/8" tubing. Nov 4 1996 Cont RIH with ESP completion. Make splice in ESP cable. Cont RIH with ESP compl. Make splice in ESP cable. Land hanger, RILDS, LD landing jt, set TWC. ND BOP's. Nov 5 1996 NU adapter flange & tree & test same. Pull TVVC & install BPV & freeze protect well tubing & annulus. Blow down lines & secure wellhead. Rig released 11/04/96 @ 1000 hrs. Page SpE~E~RRY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA BP EXPLORATION (ALASKA), MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INC. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8183.58 4491.60 4450.10 8228.22 4508.32 4466.82 8288.46 4529.73 4488.23 8384.33 4559.73 4518.23 8478.88 4584.88 4543.38 68 15 67 45 70 36 72 55 76 13 N 21.76 E .00 5486.77N 2213.11E N 21.44 E 1.30 5525.25N 2228.35E N 22.40 E 4.98 5577.48N 2249.37E N 21.40 E 2.61 5661.95N 2283.32E N 20.95 E 3.52 5746.92N 2316.23E 5914.13 5955.51 6011.79 6102.80 6193.92 8568.09 4606.52 4565.02 8665.61 4631.08 4589.58 8759.17 4654.37 4612.87 8851.60 4677.14 4635.64 8946.45 4701.18 4659.68 75 75 76 75 75 41 7 2 25 12 N 21.04 E .59 5827.72N 2347.24E N 20.12 E 1.08 5916.07N 2380.41E N 20.09 E .97 6001.16N 2411.56E N 19.31 E 1.05 6085.50N 2441.76E N 20.74 E 1.48 6171.70N 2473.17E 6280.46 6374 . 83 6465.44 6555.01 6646.76 9041.50 4725.92 4684.42 9135.86 4750.59 4709.09 9229.43 4774.62 4733.12 9324.30 4799.42 4757.92 9419.27 4824.33 4782.83 74 75 75 74 75 36 4 9 31 3 N 20.30 E .77 6257.64N 2505.34E N 20.93 E .81 6342.89N 2537.41E N 21.82 E .92 6427.10N 2570.37E N 21.12 E .97 6512.31N 2603.89E N 21.82 E .90 6597.59N 2637.43E 6738.53 6829.60 6920.02 7011.57 7103.20 9514.33 4848.54 4807.04 9609.12 4872.12 4830.62 9703.84 4895.10 4853.60 9798.00 4918.41 4876.91 9893.14 4942.32 4900.82 75 25 75 45 76 9 75 10 75 41 N 21.83 E .39 6682.93N 2671.60E N 19.95 E 1.95 6768.69N 2704.33E N 20.13 E .46 6855.02N 2735.82E N 19.57 E 1.19 6940.82N 2766.80E N 20.52 E 1.11 7027.33N 2798.36E 7195.10 7286.89 7378.78 7470.00 7562.08 9986.89 4965.03 4923.53 10080.42 4987.89 4946.39 10171.27 5010.75 4969.25 10262.09 5032.96 4991.46 10355.82 5056.07 5014.57 76 16 75 25 75 25 76 16 75 10 N 19.64 E 1.10 7112.75N 2829 N 18.80 E 1.25 7198.39N 2859 N 18.91 E .12 7281.59N 2887 N 20.00 E 1.49 7364.62N 2917 N 19.46 E 1.29 7450.12N 2947 .59E .45E .86E .19E 86E 7653.03 7743.70 7831.59 7919.64 8010.46 10444.21 5077.87 5036.37 10543.39 5100.74 5059.24 10639.53 5122.72 5081.22 10734.10 5145.31 5103.81 10828.17 5167.91 5126.41 76 15 77 4 76 29 75 51 76 20 N 19.57 E 1.23 7530.85N 2976 N 20.25 E 1.06 7621.59N 3009 N 19.67 E .85 7709.56N 3041 N 19.28 E .78 7796.13N 3071 N 20.86 E 1.71 7881.90N 3103 47E .33E 28E .90E 23E 8096.11 8192.61 8286.19 8378.01 8469.32 10922.15 5190.66 5149.16 11018.08 5214.26 5172.76 11112.43 5237.85 5196.35 11206.34 5261.41 5219.91 11300.20 5283.95 5242.45 75 37 75 52 75 9 75 46 76 26 N 20.58 E .82 7967.18N N 20.67 E .28 8054.20N N 20.76 E .77 8139.65N N 20.04 E .99 8224.85N N 21.42 E 1.59 8310.06N 3135 49E 3168.25E 3200 56E 3232.24E 3264.49E 8560.50 8653.48 8744.83 8835.73 8926.84 ORIGINAL ~RY-SUN DRILLING SERVICES ANCHOR3~GE ALASKA PAGE BP EXPLOR3~TION (ALASKA), INC. MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPER3~TOR: BP EXPLOP~ATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11395.38 5306.89 5265.39 75 39 11490.21 5329.98 5288.48 76 9 11583.26 5352.86 5311.36 75 22 11678.52 5376.71 5335.21 75 37 11770.16 5399.01 5357.51 76 11 N 21.13 E .87 8396.13N 3298.01E N 21.81 E .87 8481.73N 3331.68E N 19.97 E 2.10 8565.98N 3363.83E N 20.48 E .59 8652.51N 3395.72E N 19.91 E .87 8735.93N 3426.40E 9019.20 9111.16 9201.33 9293.55 9382.44 11860.75 5421.05 5379.55 75 38 11957.28 5444.55 5403.05 76 10 12051.92 5467.15 5425.65 76 10 12145.71 5489.93 5448.43 75 42 12241.55 5514.16 5472.66 75 0 N 19.44 E .80 8818.67N 3455.98E N 20.37 E 1.09 8906.70N 3487.86E N 20.22 E .15 8992.89N 3519.73E N 19.62 E .80 9078.43N 3550.73E N 19.19 E .86 9165.88N 3581.54E 9470.30 9563.91 9655.81 9746.79 9839.50 12337.61 5538.67 5497.17 75 26 12432.40 5562.44 5520.94 75 30 12528.17 5585.79 5544.29 76 16 12623.12 5608.93 5567.43 75 31 12716.83 5632.29 5590.79 75 35 N 19.71 E .70 9253.46N 3612.47E N 20.76 E 1.07 9339.56N 3644.20E N 20.94 E .81 9426.35N 3677.26E N 20.42 E .95 9512.51N 3709.78E N 20.06 E .38 9597.65N 3741.18E 9932.37 10024.12 10117.00 10209.08 10299.83 12811.14 5655.34 5613.84 76 6 12906.25 5678.70 5637.20 75 26 13001.54 5702.38 5660.88 75 46 13095.23 5725.98 5684.48 75 2 13190.69 5749.97 5708.47 75 50 N 21.11 E 1.21 9683.26N 3773.33E N 20.76 E .78 9769.37N 3806.27E N 21.44 E .77 9855.48N 3839.50E N 20.49 E 1.26 9940.14N 3871.94E N 21.06 E 1.02 10026.52N 3904.71E 10391.28 10483.47 10575.76 10666.42 10758.81 13285.18 5772.83 5731.33 76 9 13378.65 5795.75 5754.25 75 26 13474.78 5819.02 5777.52 76 32 13570.43 5841.85 5800.35 75 50 13663.87 5865.33 5823.83 75 3 N 21.71 E .75 10111.89N 3938.14E N 20.68 E 1.31 10196.37N 3970.90E N 22.36 E 2.04 10283.13N 4005.12E N 21.12 E 1.46 10369.40N 4039.52E N 20.90 E .88 10453.83N 4071.94E 10850.48 10941.08 11034.32 11127.17 11217.61 '13758.74 5889.91 5848.41 13852.12 5914.42 5872.92 13948.30 5939.28 5897.78 14043.03 5962.87 5921.37 14136.68 5985.75 5944.25 74 74 75 75 75 55 39 23 46 56 N 20.85 E .15 10539.44N 4104.60E N 21.76 E .98 10623.39N 4137.33E N 21.95 E .79 10709.62N 4171.92E N 21.37 E .72 10794.89N 4205.78E N 21.59 E .29 10879.39N 4239.03E 11309.24 11399.33 11492.21 11583.93 11674.73 14231.63 6008.92 5967.42 14324.34 6031.08 5989.58 14418.99 6053.44 6011.94 14513.42 6076.47 6034.97 14605.98 6099.27 6057.77 75 48 76 31 76 9 75 37 75 50 N 20.68 E .94 10965.27N 4272.23E N 20.48 E .80 11049.55N 4303.88E N 19.98 E .65 11135.85N 4335.68E N 19.74 E .61 11221.98N 4366.79E N 19.58 E .30 11306.45N 4396.97E 11766.80 11856.82 11948.79 12040.36 12130.06 RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 14700.21 6122.12 6080.62 14793.17 6144.87 6103.37 14888.31 6168.13 6126.63 14981.68 6190.95 6149.45 15076.31 6213.79 6172.29 76 5 N 19.82 E .36 11392.52N 4427.79E 75 34 N 19.56 E .61 11477.38N 4458.16E 76 6 N 20.10 E .78 11564.16N 4489.45E 75 35 N 19.89 E .59 11649.24N 4520.41E 76 28 N 21.90 E 2.26 11735.02N 4553.16E 12221.47 12311.60 12403.84 12494.38 12586.19 15170.77 6236.36 6194.86 15265.26 6259.90 6218.40 15359.91 6283.66 6242.16 15454.24 6306.91 6265.41 15549.41 6330.30 6288.80 75 52 N 19.90 E 2.15 11820.69N 4585.88E 75 16 N 18.35 E 1.71 11907.14N 4615.86E 75 39 N 19.81 E 1.55 11993.72N 4645.81E 75 48 N 19.68 E .22 12079.77N 4676.69E 75 44 N 20.28 E .62 12166.46N 4708.21E 12677.89 12769.37 12860.96 12952.37 13044.62 15644.88 6353.67 6312.17 15740.59 6377.49 6335.99 15835.80 6401.68 6360.18 15931.94 6425.70 6384.20 16026.47 6448.99 6407.49 75 55 N 20.80 E .56 12253.14N 4740.69E 75 15 N 20.79 E .70 12339.80N 4773.60E 75 19 N 20.74 E .09 12425.91N 4806.25E 75 44 N 21.28 E .70 12512.81N 4839.62E 75 43 N 20.25 E 1.06 12598.47N 4872.10E 13137.18 13229.88 13321.96 13415.05 13506.66 16122.19 6472.66 6431.16 16217.14 6496.01 6454.51 16310.77 6518.47 6476.97 16404.59 6540.92 6499.42 16498.99 6564.27 6522.77 75 38 N 20.15 E .14 12685.51N 4904.13E 75 53 N 20.75 E .67 12771.74N 4936.28E 76 20 N 21.28 E .74 12856.59N 4968.88E 75 57 N 22.59 E 1.42 12941.09N 5002.90E 75 24 N 20.67 E 2.06 13026.10N 5036.62E 13599.40 13691.44 13782.33 13873.38 13964.81 16593.65 6588.02 6546.52 16687.06 6610.87 6569.37 16783.10 6634.19 6592.69 16873.67 6657.93 6616.43 16970.62 6686.79 6645.29 75 32 N 20.32 E .39 13111.93N 5068.70E 76 8 N 19.97 E .74 13196.96N 5099.89E 75 45 N 19.16 E .91 13284.74N 5131.09E 73 50 N 19.02 E 2.10 13367.33N 5159.67E 71 31 N 17.55 E 2.81 13455.20N 5188.71E 14056.45 14147.02 14240.17 14327.53 14420.01 17064.51 6718.48 6676.98 17159.95 6754.79 6713.29 17251.80 6793.68 6752.18 17346.86 6837.70 6796.20 17442.02 6885.81 6844.31 69 1 N 17.54 E 2.66 13539.45N 5215.35E 66 15 N 17.34 E 2.91 13623.64N 5241.80E 63 39 N 17.33 E 2.83 13703.07N 5266.59E 61 9 N 17.94 E 2.68 13783.33N 5292.10E 58 5 N 16.29 E 3.55 13861.78N 5316.28E 14508.26 14596.39 14679.48 14763.60 14845.55 17534.48 6936.44 6894.94 17630.13 6991.99 6950.49 17722.74 7048.89 7007.39 17817.28 7109.30 7067.80 17911.67 7170.35 7128.85 55 29 N 17.88 E 3.17 13935.72N 5338.99E 53 29 N 18.73 E 2.21 14009.63N 5363.43E 50 40 N 18.88 E 3.04 14078.79N 5386.98E 49 53 N 18.63 E .86 14147.65N 5410.36E 49 30 N 18.46 E .44 14215.89N 5433.26E 14922.78 15000.57 15073.59 15146.29 15218.23 .RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT. 18007.47 7232.96 7191 18100.65 7294.81 7253 18194.94 7358.12 7316 18287.26 7420.52 7379 18380.87 7484.35 7442 .46 .31 .62 .02 .85 48 52 N 17.56 E .96 14284.85N 5455.68E 47 57 N 17.32 E 1.02 14351.34N 5476.56E 47 41 N 17.54 E .33 14418.00N 5497.49E 47 15 N 17.14 E .56 14482.95N 5517.77E 46 45 N 17.15 E .54 14548.37N 5537.96E 15290.67 15360.27 15430.05 15497.99 15566.34 18475.14 7549.10 7507 18568.63 7613.67 7572 18661.65 7678.40 7636 18754.03 7743.39 7701 18823.00 7792.22 7750 .60 .17 .90 .89 .72 46 29 N 17.64 E .47 14613.75N 46 9 N 17.68 E .37 14678.18N 45 39 N 17.36 E .58 14741.88N 44 55 N 17.73 E .85 14804.48N 44 55 N 17.73 E .00 14850.87N 5558.44E 15634.76 5578.95E 15702.30 5599.06E 15769.02 5618.85E 15834.58 5633.68E 15883.23 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 15883.54 FEET AT NORTH 20 DEG. 46 MIN. EAST AT MD = 18823 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 20.42 DEG. TIE-IN SURVEY AT 8,183.58' MD WINDOW POINT AT 8,228.22' MD PROJECTED SURVEY AT 18,823.00' MD ~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8183.58 4491.60 4450.10 5486.77 N 2213.11 E 9183.58 4762.88 4721.38 6385.95 N 2553.90 E 10183.58 5013.85 4972.35 7292.86 N 2891.72 E 11183.58 5255.82 5214.32 8204.12 N 3224.68 E 12183.58 5499.28 5457.78 9113.00 N 3563.06 E 3691.98 4420.70 728.72 5169.73 749.03 5927.76 758.03 6684.30 756.54 13183.58 5748.23 5706.73 10020.09 N 3902.24 E 14183.58 5997.15 5955.65 10921.69 N 4255.77 E 15183.58 6239.48 6197.98 11832.38 N 4590.11 E 16183.58 6487.83 6446.33 12741.31 N 4924.75 E 17183.58 6764.43 6722.93 13644.23 N 5248.23 E 7435.35 751.04 8186.43 751.09 8944.10 757.66 9695.75 751.66 10419.15 723.39 18183.58 7350.47 7308.97 14409.99 N 5494.96 E 18823.00 7792.22 7750.72 14850.87 N 5633.68 E 10833.11 413.96 11030.78 197.67 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. .{RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 092896 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8183.58 4491.60 4450.10 5486.77 N 2213.11 E 3691.98 8323.92 4541.50 4500.00 5608.41 N 2262.11 E 3782.42 90.44 8706.32 4641.50 4600.00 5953.02 N 2393.95 E 4064.82 282.40 9100.57 4741.50 4700.00 6311.03 N 2525.24 E 4359.07 294.25 9486.34 4841.50 4800.00 6657.78 N 2661.53 E 4644.84 285.77 9889.81 4941.50 4900.00 7024.31 N 2797.23 E 4948.31 303.47 10298.06 5041.50 5000.00 7397.46 N 2929.14 E 5256.56 308.25 10718.48 5141.50 5100.00 7781.84 N 3066.90 E 5576.98 320.42 11126.67 5241.50 5200.00 8152.52 N 3205.44 E 5885.17 308.19 11538.11 5341.50 5300.00 8524.94 N 3348.80 E 6196.61 311.44 11944.53 5441.50 5400.00 8895.09 N 3483.55 E 6503.03 306.42 12348.88 5541.50 5500.00 9263.74 N 3616.15 E 6807.38 304.36 12753.85 5641.50 5600.00 9631.33 N 3753.48 E 7112.35 304.97 13156.05 5741.50 5700.00 9995.18 N 3892.64 E 7414.55 302.20 13569.00 5841.50 5800.00 10368.11 N 4039.02 E 7727.50 312.96 13957.11 5941.50 5900.00 10717.53 N 4175.11 E 8015.61 288.11 14368.96 6041.50 6000.00 11090.21 N 4319.03 E 8327.46 311.85 14779.65 6141.50 6100.00 11465.05 N 4453.77 E 8638.15 310.69 15191.85 6241.50 6200.00 11839.92 N 4592.84 E 8950.35 312.20 15594.94 6341.50 6300.00 12207.85 N 4723.54 E 9253.44 303.09 15996.07 6441.50 6400.00 12570.83 N 4861.90 E 9554.57 301.13 16406.99 6541.50 6500.00 12943.23 N 5003.80 E 9865.49 310.92 16812.79 6641.50 6600.00 13311.93 N 5140.53 E 10171.29 305.81 17126.27 6741.50 6700.00 13594.10 N 5232.56 E 10384.77 213.48 17354.66 6841.50 6800.00 13789.82 N 5294.18 E 10513.16 128.39 17543.41 6941.50 6900.00 13942.73 N 5341.25 E 10601.91 88.75 17711.00 7041.50 7000.00 14070.17 N 5384.03 E 10669.50 67.59 17867.24 7141.50 7100.00 14183.85 N 5422.55 E 10725.74 56.23 18020.45 7241.50 7200.00 14294.17 N 5458.63 E 10778.95 53.21 18170.25 7341.50 7300.00 14400.59 N 5491.99 E 10828.75 49.80 18318.18 7441.50 7400.00 14504.65 N 5524.46 E 10876.68 47.93 18464.10 7541.50 7500.00 14606.12 N 5556.01 E 10922.60 45.92 18608.79 7641.50 7600.00 14705.76 N 5587.73 E 10967.29 44.69 18751.37 7741.50 7700.00 14802.69 N 5618.28 E 11009.87 42.58 18783 · 58 7764.31 7722.81 14824.36 N 5625.21 E 11019.27 9.40 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWE THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS -' S. tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 090496 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 14839.38 6782.17 6740.67 70 23 N 22.60 E .00 11294.33N 4517.15E 12103.82 14891.07 6799.51 6758.01 70 25 N 23.32 E 1.31 11339.17N 4536.15E 12152.16 14983.88 6829.97 6788.47 71 15 N 21.38 E 2.17 11420.24N 4569.47E 12239.30 15079.04 6860.90 6819.40 70 48 N 18.74 E 2.67 11504.75N 4600.34E 12329.05 15174.32 6892.96 6851.46 69 52 N 17.07 E 1.92 11590.11N 4627.92E 12418.71 15267.63 6925.36 6883.86 69 30 N 16.27 E .90 11673.94N 4653.02E 12506.21 15362.26 6958.07 6916.57 70 3 N 16.42 E .60 11759.14N 4678.01E 12595.00 15457.45 6992.40 6950.90 67 39 N 16.38 E 2.51 11844.29N 4703.07E 12683.76 15552.65 7028.91 6987.41 67 14 N 16.68 E .53 11928.58N 4728.09E 12771.68 15647.38 7065.61 7024.11 67 11 N 20.75 E 3.96 12011.28N 4756.10E 12858.90 15741.94 7101.94 7060.44 67 37 N 18.99 E 1.78 12093.37N 4785.77E 12946.01 15837.31 7138.33 7096.83 67 30 N 17.79 E 1.17 12177.02N 4813.58E 13034.08 15930.31 7172.93 7131.43 68 48 N 19.50 E 2.21 12258.79N 4841.18E 13120.31 16025.95 7205.96 7164.46 70 47 N 21.77 E 3.04 12342.78N 4872.82E 13209.77 16120.42 7235.70 7194.20 72 30 N 22.26 E 1.88 12425.89N 4906.42E 13298.94 16217.88 7263.63 7222.13 74 11 N 23.62 E 2.19 12511.86N 4942.81E 13391.63 16312.35 7286.93 7245.43 77 15 N 24.65 E 3.41 12595.40N 4980.25E 13482.27 16405.26 7305.04 7263.54 80 16 N 22.47 E 3.98 12678.92N 5016.66E 13572.61 16502.04 7320.86 7279.36 80 54 N 21.31 E 1.35 12767.51N 5052.25E 13667.59 16596.67 7335.40 7293.90 81 25 N 19.02 E 2.45 12855.27N 5084.48E 13760.84 16692.04 7349.67 7308.17 81 22 N 16.59 E 2.52 12945.02N 5113.31E 13855.07 16761.00 7360.02 7318.52 81 22 N 16.59 E .00 13010.37N 5132.77E 13923.25 THE CALCULATION PROCEDURES THREE-DIMENSION MINIMUM HORIZONTAL DISPLACEMENT AT NORTH 21 DEG. 31 MIN. ARE BASED ON THE USE OF CURVATURE METHOD. = 13986.24 FEET EAST AT MD = 16761 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 16.09 DEG. TIE-IN SURVEY AT 14,839.00' MD OPEN-HOLE SIDE TRACK PROJECTED SURVEY AT 16,761.00' MD XRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 090496 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPER3~TOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 14839.38 6782.17 6740.67 11294.33 N 4517.15 E 8057.21 15839.38 7139.13 7097.63 12178.84 N 4814.16 E 8700.25 643.04 16761.00 7360.02 7318.52 13010.37 N 5132.77 E 9400.98 700.73 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. Si XRY-SLrN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 12/ 4/96 DATE OF SURVEY: 090496 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 14839.38 6782.17 6740.67 11294.33 N 4517.15 E 8057.21 15019.78 6841.50 6800.00 11451.89 N 4581.86 E 8178.28 15313.81 6941.50 6900.00 11715.47 N 4665.15 E 8372.3I 15585.17 7041.50 7000.00 11957.19 N 4737.07 E 8543.67 121.07 194.03 171.37 15845.58 7141.50 7100.00 12184.30 N 4815.91 E 8704.08 16139.70 7241.50 7200.00 12442.91 N 4913.39 E 8898.20 16637.56 7341.50 7300.00 12893.49 N 5097.66 E 9296.06 16659.38 7344.77 7303.27 12914.08 N 5104.08 E 9314.61 160.41 194.12 397.86 18.55 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS S tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -41.50 173.50 173.50 132.00 226.35 226.34 184.84 259.13 259.12 217.62 350.07 350.05 308.55 0 0 0 33 0 28 0 45 1 12 N .00 E .00 .00N .00E S 60.60 E .32 .41S .73E S 43.84 E .32 .69S 1.10E S 62.72 E 1.04 .88S 1.38E S 85.38 E .64 1.23S 2.86E .00 -.19 -.36 - .47 -.39 440.40 440.34 398.84 530.82 530.70 489.20 621.59 621.33 579.83 712 . 63 712 . 08 670 . 58 803 . 84 802 . 75 761 . 25 1 52 2 30 3 42 5 18 7 2 N 88.22 E .76 1.26S 5.27E .25 N 82.40 E .74 .96S 8.70E 1.49 N 72.20 E 1.46 .20N 13.46E 3.92 N 58.30 E 2.12 3.32N 19.85E 8.69 N 52.38 E 2.02 8.95N 27.87E 16.32 894.26 892.22 850.72 987.20 983.52 942.02 1082.80 1076.77 1035.27 1177.16 1168.32 1126.82 1273.22 1261.04 1219.54 9 30 N 42.70 E 3.13 17.82N 37.33E 11 56 N 42.98 E 2.63 30.50N 49.09E 13 28 N 42.78 E 1.60 45.92N 63.41E 14 30 N 42.00 E 1.10 62.77N 78.78E 15 48 N 40.48 E 1.43 81.66N 95.32E 27.47 42.91 61.69 82.15 104.88 1367.52 1351.30 1309.80 1463.61 1441.96 1400.46 1558.24 1530.14 1488.64 1652.97 1618.19 1576.69 1746.74 1705.13 1663.63 17 46 20 53 21 40 21 37 22 23 N 36.43 E 2.43 103.02N 112.21E N 32.11 E 3.56 129.34N 130.04E N 26.66 E 2.25 159.24N 146.84E N 26.84 E .09 190.45N 162.57E N 25.56 E .97 221.97N 178.08E 130.08 160.31 193.70 228.04 262.63 1841.51 1792.00 1750.50 1937.01 1877.80 1836.30 2032.14 1960.93 1919.43 2125.53 2039.76 1998.26 2221.45 2117.63 2076.13 24 43 27 21 30 47 34 2 37 22 N 21.12 E 3.09 256.75N 193.01E N 20.81 E 2.77 295.89N 208.00E N 20.11 E 3.62 339.20N 224.14E N 18.48 E 3.60 386.45N 240.65E N 18.74 E 3.49 439.50N 258.52E 300.18 341.95 388.04 438.01 493.94 2315.67 2191.16 2149.66 2410.88 2262.90 2221.40 2506.03 2331.92 2290.42 2600.68 2396.93 2355.43 2695.70 2458.23 2416.73 40 42 44 48 51 1 9 50 22 15 N 18.80 E 2.81 495.28N 277.48E N 19.18 E 2.24 554.44N 297.84E N 20.80 E 3.07 615.97N 320.25E N 20.97 E 3.72 680.22N 344.77E N 20.64 E 3.05 748.08N 370.54E 552.78 615.27 680.60 749.13 821.47 2791.72 2516.51 2475.01 2885.87 2570.64 2529.14 2979.53 2621.42 2579.92 3074.91 2669.67 2628.17 3169.79 2715.00 2673.50 53 59 55 48 58 31 60 40 62 15 N 20.07 E 2.88 819.61N 397.08E N 20.71 E 2.01 891.80N 423.92E N 20.50 E 2.91 965.46N 451.61E N 20.65 E 2.25 1042.47N 480.51E N 20.55 E 1.67 1120.48N 509.84E 897.56 974.36 1052.81 1134.81 1217.89 ORIGii JAL S~ .tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATE DEGREES DG/100 NORTH/SOUTH EAST/WEST S VERT. SECT. 3263.33 2757.83 2716.33 3357.68 2798.32 2756.82 3451.84 2834.71 2793.21 3546.94 2868.18 2826.68 3640.44 2900.11 2858.61 63 15 N 21.00 E 1.15 1198.23N 539.33E 65 55 N 21.10 E 2.83 1277.76N 569.94E 68 35 N 20.68 E 2.88 1358.88N 600.90E 70 11 N 19.31 E 2.15 1442.52N 631.33E 69 52 N 19.68 E .51 1525.36N 660.65E 1300.77 1385.66 1472.19 1560.98 1648.71 3732.31 2932.26 2890.76 3826.05 2964.71 2923.21 3921.90 2997.26 2955.76 4016.95 3030.36 2988.86 4111.29 3064.86 3023.36 69 9 N 19.86 E .79 1606.35N 689.76E 70 19 N 20.20 E 1.29 1688.96N 719.88E 69 57 N 20.22 E .39 1773.57N 751.03E 69 16 N 20.28 E .72 1857.16N 781.87E 67 49 N 20.78 E 1.62 1939.38N 812.66E 1734.59 1822.32 1912.24 2001.10 2088.63 4203.83 3098.77 3057.27 4298.10 3132.86 3091.36 4393.44 3167.30 3125.80 4489.51 3201.24 3159.74 4577.30 3232.18 3190.68 69 10 N 21.35 E 1.58 2019.72N 843.60E 68 25 N 21.08 E .85 2101.65N 875.41E 69 13 N 21.22 E .86 2184.56N 907.48E 69 23 N 20.69 E .54 2268.49N 939.62E 69 20 N 21.50 E .87 2345.14N 969.19E 2174.40 2261.94 2350.49 2440.04 2521.89 4670.22 3264.88 3223.38 4769.53 3299.63 3258.13 4863.78 3332.45 3290.95 4957.07 3364.57 3323.07 5052.95 3397.04 3355.54 69 27 N 21.28 E .26 2426.13N 1000.92E 69 34 N 21.13 E .18 2512.86N 1034.56E 69 40 N 21.24 E .15 2595.24N 1066.49E 70 3 N 20.51 E .85 2677.08N 1097.70E 70 20 N 21.32 E .85 2761.34N 1129.91E 2608.49 2701.15 2789.15 2876.43 2966.32 5148.40 3428.92 3387.42 5240.12 3459.58 3418.08 5332.59 3490.81 3449.31 5426.55 3522.88 3481.38 5521.08 3555.18 3513.68 70 38 N 21.07 E .40 2845.23N 1162.43E 70 18 N 20.43 E .75 2926.06N 1193.06E 70 12 N 19.64 E .81 3007.83N 1222.88~ 69 52 N 22.83 E 3.21 3090.14N 1254.86E 70 9 N 21.78 E 1.08 3172.33N 1288.57E 3055.94 3142.09 3228.92 3316.87 3405.18 5615.32 3587.24 3545.74 5707.04 3618.71 3577.21 5801.25 3651.09 3609.59 5895.83 3683.17 3641.67 5936.87 3696.93 3655.43 70 4 N 21.81 E .10 3254.61N 1321.48E 69 47 N 21.63 E .36 3334.65N 1353.36E 70 0 N 21.26 E .44 3416.99N 1385.71E 70 19 N 21.42 E .37 3499.87N 1418.08E 70 30 N 22.19 E 1.82 3535.76N 1432.44E 3493.37 3579.10 3667.19 3755.78 3794.26 6034.60 3729.74 3688.24 6128.62 3761.47 3719.97 6224.41 3794.09 3752.59 6321.06 3827.65 3786.15 6413.78 3861.36 3819.86 70 15 N 22.50 E .39 3620.91N 1467.44E 70 18 N 22.44 E .07 3702.69N 1501.27E 69 52 N 21.56 E .97 3786.20N 1535.01E 69 28 N 21.33 E .47 3870.56N 1568.14E 67 52 N 21.29 E 1.73 3951.02N 1599.53E 3885.76 3973.72 4063.30 4153.54 4239.55 ~.RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6510.06 3896.53 3855.03 6605.05 3930.50 3889.00 6700.88 3964.85 3923.35 6787.54 3995.99 3954.49 6885.05 4030.21 3988.71 69 16 N 21.20 E 1.45 4034.55N 1632.01E 68 49 N 20.92 E .55 4117.33N 1663.88E 69 10 N 22.22 E 1.32 4200.52N 1696.77E 68 42 N 22.00 E .58 4275.44N 1727.21E 70 11 N 21.80 E 1.54 4360.15N 1761.26E 4328.81 4417.18 4506.23 4586.65 4677.48 6976.46 4061.43 4019.93 7075.86 4095.77 4054.27 7169.70 4128.22 4086.72 7260.08 4159.63 4118.13 7356.25 4193.44 4151.94 69 51 N 21.83 E .37 4439.92N 1793.19E 69 42 N 21.83 E .15 4526.50N 1827.87E 69 49 N 21.98 E .20 4608.20N 1860.72E 69 30 N 22.21 E .44 4686.72N 1892.60E 69 19 N 21.41 E .80 4770.30N 1926.05E 4762.97 4855.78 4943.38 5027.66 5117.24 7452.06 4227.82 4186.32 7546.52 4261.74 4220.24 7641.66 4295.40 4253.90 7734.81 4328.92 4287.42 7829.28 4363.03 4321.53 68 36 N 21.50 E .76 4853.53N 1958.76E 69 18 N 22.08 E .94 4935.40N 1991.48E 69 14 N 21.60 E .48 5017.99N 2024.59E 68 34 N 20.47 E 1.34 5099.10N 2055.78E 69 5 N 21.76 E 1.38 5181.28N 2087.52E 5206.27 5294.00 5382.53 5469.11 5556.87 7924.14 4397.53 4356.03 8016.51 4431.16 4389.66 8112.38 4465.51 4424.01 8183.58 4491.47 4449.97 8228.22 4508.19 4466.69 68 15 N 21.71 E .88 5263.36N 2120.24E 69 1 N 23.46 E 1.95 5342.78N 2153.28E 68 58 N 22.39 E 1.04 5425.21N 2188.14E 68 15 N 21.76 E 1.32 5486.65N 2213.06E 67 45 N 21.44 E 1.30 5525.13N 2228.29E 5644.80 5730.26 5819.13 5885.06 5926.26 8325.06 4543.79 4502.29 8418.05 4577.02 4535.52 8513.69 4610.49 4568.99 8608.63 4642.86 4601.36 8703.67 4675.60 4634.10 69 7 N 21.66 E 1.43 5608.89N 2261.37E 69 0 N 21.56 E .16 5689.63N 2293.36E 70 1 N 21.32 E 1.10 5773.02N 2326.10E 70 5 N 20.48 E .84 5856.40N 2357.94E 69 35 N 19.82 E .84 5940.16N 2388.68E 6015.91 6102.35 6191.55 6280.48 6369.48 8798.37 4707.98 4666.48 8894.97 4740.41 4698.91 8989.79 4772.81 4731.31 9084.91 4805.67 4764.17 9180.46 4838.56 4797.06 70 24 N 20.71 E 1.23 6023.64N 2419.50E 70 21 N 20.57 E .15 6108.79N 2451.58E 69 40 N 19.98 E .93 6192.38N 2482.46E 69 54 N 20.61 E .66 6276.10N 2513.42E 69 49 N 20.46 E .16 6360.11N 2544.89E 6458.23 6548.94 6637.81 6726.83 6816.27 9273.00 4870.34 4828.84 9368.10 4902.96 4861.46 9462.98 4935.80 4894.30 9558.33 4969.26 4927.76 9650.46 5001.35 4959.85 70 0 N 20.85 E .44 6441.43N 2575.54E 69 52 N 20.22 E .64 6525.09N 2606.88E 69 36 N 21.40 E 1.20 6608.29N 2638.50E 69 18 N 21.10 E .43 6691.50N 2670.86E 69 55 N 21.31 E .70 6772.02N 2702.10E 6902.91 6991.97 7080.68 7169.60 7255.62 .tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES .DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9745.06 5033.23 4991.73 9839.22 5064.40 5022.90 9933.55 5095.36 5053.86 10028.16 5125.86 5084.36 10124.02 5156.19 5114.69 70 41 70 38 71 2 71 20 71 45 N 24.70 E 3.47 6853.98N 2736.91E N 23.89 E .81 6934.96N 2773.46E N 23.14 E .86 7016.67N 2809.01E N 22.32 E .88 7099.27N 2843.62E N 22.82 E .65 7183.24N 2878.52E 7344.02 7431.96 7520.32 7609.27 7699.62 10216.52 5184.70 5143.20 10310.44 5213.91 5172.41 10404.55 5243.60 5202.10 10499.51 5273.69 5232.19 10590.67 5303.85 5262.35 72 20 71 24 71 48 71 14 70 7 N 22.45 E .75 7264.45N 2912.38E N 22.18 E 1.04 7347.03N 2946.27E N 22.09 E .43 7429.75N 2979.92E N 21.55 E .81 7513.36N 3013.40E N 21.31 E 1.25 7593.44N 3044.83E 7787.04 7875.78 7964.58 8054.20 8139.85 10688.05 5336.67 5295.17 10781.69 5368.46 5326.96 10876.11 5401.76 5360.26 10971.74 5436.25 5394.75 11062.78 5468.87 5427.37 70 69 68 68 69 29 48 53 49 10 N 21.46 E .41 7678.81N 3078.26E N 21.40 E .73 7760.79N 3110.44E N 22.10 E 1.20 7842.85N 3143.18E N 21.65 E .44 7925.62N 3176.41E N 21.61 E .39 8004.63N 3207.74E 8231.14 8318.83 8406.75 8495.49 8580.09 11158.44 5502.55 5461.05 11253.43 5535.89 5494.39 11349.04 5569.60 5528.10 11441.87 5601.98 5560.48 11535.18 5634.03 5592.53 69 35 69 18 69 24 69 46 70 3 N 20.99 E .74 8088.05N 3240.26E N 21.65 E .71 8170.91N 3272.60E N 21.70 ~ .11 8254.05N 3305.64E N 21.70 E .40 8334.89N 3337.81E N 20.91 E .85 8416.53N 3369.65E 8669.25 8757.82 8846.87 8933.45 9020.72 11627.52 5666.11 5624.61 11723.16 5699.85 5658.35 11817.59 5732.73 5691.23 11910.86 5764.66 5723.16 12002.08 5795.89 5754.39 69 17 69 24 69 50 70 7 69 50 N 21.92 E 1.32 8497.13N 3401.26E N 22.25 E .34 8580.06N 3434.91E N 21.63 E .77 8662.17N 3467.98E N 21.31 E .44 8743.72N 3500.06E N 22.87 E 1.64 8823.13N 3532.28E 9106.93 9195.93 9283.99 9371.24 9456.47 12096.98 5828.34 5786.84 12190.42 5860.52 5819.02 12285.04 5893.29 5851.79 12381.59 5926.97 5885.47 12479.16 5961.18 5919.68 70 10 69 33 69 55 69 14 69 43 N 23.26 E .52 8905.18N 3567.22E N 22.94 E .74 8985.87N 3601.64E N 22.86 E .40 9067.63N 3636.18E N 22.47 E .80 9151.13N 3671.05E N 22.20 E .56 9235.65N 3705.77E 9544.98 9632.05 9720.19 9810.08 9900.91 12574.72 5993.93 5952.43 12670.48 6027.41 5985.91 12765.46 6061.67 6020.17 12860.48 6095.78 6054.28 12953.99 6128.76 6087.26 70 11 68 52 68 49 69 5 69 35 N 22.08 E .51 9318.80N N 22.05 E 1.37 9401.94N N 21.74 E .31 9484.14N N 21.61 E .31 9566.55N N 21.50 E .54 9647.93N 3739.60E 9990.18 3773.30E 10079.41 3806.34E 10167.54 3839.09E 10255.80 3871.24E 10342.90 SI '.RY-SLTN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COD-RS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 13049.04 6161.60 6120.10 13144.21 6194.99 6153.49 13239.44 6228.87 6187.37 13331.85 6260.98 6219.48 13426.84 6294.44 6252.94 69 59 N 21.62 E .44 9730.89N 3904 68 55 N 20.41 E 1.64 9814.07N 3935 69 24 N 20.68 E .58 9897.41N 3967 69 55 N 20.60 E .56 9978.50N 3997 68 49 N 20.82 E 1.18 10061.65N 4029 .02E 10431.69 .98E 10520.47 .21E 10609.20 .75E 10695.58 .19E 10784.19 13521.08 6328.13 6286.63 13614.76 6360.82 6319.32 13709.65 6393.36 6351.86 13803.10 6425.53 6384.03 13897.71 6458.21 6416.71 69 18 N 20.43 E .64 10144.02N 4060 69 50 N 20.93 E .77 10226.15N 4091 70 2 N 20.31 E .65 10309.58N 4122 69 40 N 21.43 E 1.19 10391.55N 4153 69 54 N 21.76 E .41 10474.11N 4186 .19E 10871.93 .20E 10959.43 .59E 11048.29 .84E 11135.71 .52E 11224.09 13991.97 6490.10 6448.60 14086.34 6521.93 6480.43 14181.07 6554.01 6512.51 14273.51 6585.60 6544.10 14369.77 6619.87 6578.37 70 32 N 21.58 E .69 10556.54N 4219 70 1 N 21.36 E .58 10639.21N 4251 70 23 N 20.84 E .64 10722.37N 4283 69 38 N 21.21 E .89 10803.46N 4315 68 39 N 22.10 E 1.34 10887.06N 4348 .27E 11312.37 .79E 11400.82 .87E 11489.61 .04E 11576.16 .23E 11665.68 14464.33 6654.00 6612.50 14556.66 6686.66 6645.16' 14652.04 6719.57 6678.07 14744.82 6750.61 6709.11 14839.38 6782.01 6740.51 69 1 N 22.38 E .49 10968.68N 4381 69 32 N 22.60 E .60 11048.47N 4414 70 5 N 22.73 E .59 11131.08N 4449 70 49 N 22.57 E .80 11211.77N 4482 70 23 N 22.60 E .46 11294.12N 4517 .61E 11753.36 .64E 11839.18 .14E 11928.11 .81E 12014.97 .06E 12103.59 14934.14 6813.41 6771.91 15029.71 6845.25 6803.75 15122.19 6877.35 6835.85 15217.48 6910.83 6869.33 15310.04 6942.06 6900.56 70 54 N 22.56 E .54 11376.67N 4551 70 11 N 22.17 E .84 11460.01N 4585 69 10 N 21.58 E 1.25 11540.48N 4617 69 40 N 21.48 E .53 11623.47N 4650 70 52 N 21.98 E 1.39 11704.41N 4682 .39E 12192.42 .68E 12282.00 .99E 12368.28 .73E 12457.09 .99E 12543.79 15405.16 6973.74 6932.24 15499.90 7006.73 6965.23 15593.28 7039.98 6998.48 15685.14 7072.00 7030.50 15778.74 7103.42 7061.92 70 12 N 20.95 E 1.24 11787.87N 4715 69 1 N 20.55 E 1.31 11870.91N 4747 69 15 N 20.77 E .33 11952.56N 4778 69 55 N 20.32 E .86 12033.18N 4808 70 50 N 20.63 E 1.03 12115.78N 4839 .81E 12633.08 .27E 12721.59 .06E 12808.58 .28E 12894.41 .12E 12982.32 15873.11 7135.12 7093.62 15967.58 7167.36 7125.86 16062.92 7199.25 7157.75 16159.18 7231.10 7189.60 16253.59 7260.34 7218.84 69 53 N 21.38 E 1.26 12198.75N 4870.97E 13070.88 70 11 N 21.58 E .38 12281.38N 4903.49E 13159.28 70 42 N 21.73 E .56 12364.89N 4936.65E 13248.70 70 39 N 21.14 E .58 12449.44N 4969.84E 13339.14 73 16 N 20.40 E 2.87 12533.37N 5001.67E 13428.61 S. .tRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 MWD SURVEY JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPEKATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 16348.48 7285.14 7243.64 76 25 N 18.69 E 3.75 12619.67N 5032.29E 13520.02 16442.54 7306.18 7264.68 77 43 N 16.61 E 2.57 12707.01N 5060.08E 13611.64 16517.00 7322.00 7280.50 77 43 N 16.61 E .00 12776.74N 5080.88E 13684.39 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 13749.92 FEET AT NORTH 21 DEG. 41 MIN. EAST AT MD = 16'517 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 16.09 DEG. SURFACE TIE-IN FOR SPUD 0.00' MD PROJECTED SURVEY AT 16,517.00' MD RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLOP~ATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -41.50 .00 N .00 E 1000.00 996.04 954.54 32.44 N 50.90 E 2000.00 1933.16 1891.66 324.03 N 218.55 E 3000.00 2632.10 2590.60 981.82 N 457.72 E 4000.00 3024.37 2982.87 1842.29 N 776.37 E .00 3.96 3.96 66.84 62.89 367.90 301.05 975.63 607.74 5000.00 3379.21 3337.71 2714.88 N 1111.84 E 6000.00 3718.06 3676.56 3590.82 N 1454.98 E 7000.00 4069.53 4028.03 4460.43 N 1801.41 E 8000.00 4425.25 4383.75 5328.64 N 2147.14 E 9000.00 4776.35 4734.85 6201.38 N 2485.73 E 1620.79 645.16 2281.94 661.15 2930.47 648.53 3574.75 644.28 4223.65 648.90 10000.00 5116.85 5075.35 7074.59 N 2833.48 E 11000.00 5446.45 5404.95 7950.12 N 3186.13 E 12000.00 5795.18 5753.68 8821.33 N 3531.52 E 13000.00 6144.81 6103.31 9688.05 N 3887.04 E 14000.00 6492.77 6451.27 10563.58 N 4222.05 E 4883.15 659.50 5553.55 670.40 6204.82 651.28 6855.19 650.37 7507.23 652.03 15000.00 6835.18 6793.68 11434.12 N 4575.13 E 16000.00 7178.34 7136.84 12309.75 N 4914.71 E 16517.00 7322.00 7280.50 12776.74 N 5080.88 E 8164.82 657.60 8821.66 656.83 9195.00 373.34 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~ ~{RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATE S NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -41 41.50 41.50 141.50 141.50 100 241.51 241.50 200 341.52 341.50 300 .50 .00 .00 .00 .00 .00 N .00 E .00 .00 N .00 E .00 .00 .26 S .46 E .00 .00 .78 S 1.19 E .01 .01 1.22 S 2.68 E .02 .01 441.56 441.50 400 541.63 541.50 500 641.80 641.50 600 742.18 741.50 700 842.93 841.50 800 .00 .00 .00 .00 .00 1.26 S 5.31 E .90 S 9.17 E .60 N 14.71 E 4.76 N 22.18 E 12.28 N 31.80 E .06 .04 .13 .08 .30 .17 .68 .38 1.43 .75 944.26 941.50 1046.54 1041.50 1149.45 1141.50 1252.92 1241.50 1357.23 1341.50 900 1000 1100 1200 1300 .00 .00 .00 .00 .00 24.01 N 43.05 E 39.72 N 57.67 E 57.62 N 74.14 E 77.45 N 91.73 E 100.49 N 110.35 E 2.76 1.32 5.04 2.28 7.95 2.92 11.42 3.46 15.73 4.31 1463.11 1441.50 1400 1570.46 1541.50 1500 1678.04 1641.50 1600 1786.22 1741.50 1700 1896.35 1841.50 1800 .00 .00 .00 .00 .00 129.19 N 129.94 E 163.28 N 148.87 E 198.69 N 166.74 E 235.94 N 184.45 E 278.78 N 201.47 E 21.61 5.89 28.96 7.35 36.54 7.58 44.72 8.18 54.85 10.13 2009.63 1941.50 1900 2127.65 2041.50 2000 2251.67 2141.50 2100 2382.01 2241.50 2200 2519.61 2341.50 2300 .00 .00 .00 .00 .00 328.55 N 220.22 E 387.60 N 241.03 E 457.06 N 264.48 E 536.15 N 291.48 E 624.97 N 323.67 E 68.13 13.29 86.15 18.02 110.17 24.02 140.51 30.34 178.11 37.60 2669.23 2441.50 2834.26 2541.50 3018.00 2641.50 3227.05 2741.50 3470.45 2841.50 2400 2500 2600 2700 2800 .00 .00 .00 .00 .00 728.89 N 363.30 E 851.94 N 408.90 E 996.20 N 463.10 E 1167.99 N 527.72 E 1375.09 N 607.02 E 227.73 49.61 292.76 65.03 376.50 83.74 485.55 109.05 628.95 143.39 3758.28 2941.50 2900.0 4048.42 3041.50 3000.0 4321.58 3141.50 3100.0 4603.71 3241.50 3200.0 4889.82 3341.50 3300.0 1629.18 N 698.01 E 1884.77 N 792.07 E 2122.02 N 883.26 E 2368.13 N 978.25 E 2618.00 N 1075.34 E 816.78 187.84 1006.92 190.14 1180.08 173.16 1362.21 182.13 1548.32 186.11 S ~{RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 5186.31 3441.50 3400.00 5480.77 3541.50 3500.00 5773.20 3641.50 3600.00 6069.40 3741.50 3700.00 6360.54 3841.50 3800.00 2878.61 N 1175.27 3137.11 N 1274.50 3392.43 N 1376.15 3651.17 N 1479.98 3905.00 N 1581.59 E 1744.81 196.49 E 1939.27 194.45 E 2131.70 192.44 E 2327.90 196.20 E 2519.04 191.14 6635.50 3941.50 3900.00 6918.39 4041.50 4000.00 7208.18 4141.50 4100.00 7489.57 4241.50 4200.00 7769.25 4341.50 4300.00 4143.85 N 1674.02 4389.28 N 1772.91 4641.68 N 1874.25 4886.03 N 1971.56 5129.14 N 2066.99 E 2694.00 174.96 E 2876.89 182.89 E 3066.68 189.79 E 3248.07 181.39 E 3427.75 179.68 8045.40 4441.50 4400.00 8318.65 4541.50 4500.00 8604.64 4641.50 4600.00 8898.22 4741.50 4700.00 9188.99 4841.50 4800.00 5367.52 N 2164.02 5603.32 N 2259.16 5852.88 N 2356.63 6111.65 N 2452.65 6367.61 N 2547.69 E 3603.90 176.15 E 3777.15 173.25 E 3963.14 185.99 E 4156.72 193.58 E 4347.49 190.77 9479.33 4941.50 4900.00 9770.08 5041.50 5000.00 10077.15 5141.50 5100.00 10397.82 5241.50 5200.00 10702.52 5341.50 5300.00 6622.56 N 2644.09 6875.43 N 2746.77 7142.20 N 2861.27 7423.83 N 2977.52 7691.50 N 3083.25 E 4537.83 190.33 E 4728.58 190.75 E 4935.65 207.07 E 5156.32 220.68 E 5361.02 204.69 10986.28 5441.50 5400.00 11269.31 5541.50 5500.00 11557.07 5641.50 5600.00 11843.02 5741.50 5700.00 12135.76 5841.50 5800.00 7938.23 N 3181.41 8184.71 N 3278.08 8435.75 N 3376.99 8684.36 N 3476.78 8938.70 N 3581.63 E 5544.78 183.76 E 5727.81 183.03 E 5915.57 187.76 E 6101.52 185.96 E 6294.26 192.74 12422.60 5941.50 5900.00 12709.59 6041.50 6000.00 12990.52 6141.50 6100.00 13275.37 6241.50 6200.00 13558.92 6341.50 6300.00 9186.57 N 3685.70 9435.76 N 3786.99 9679.79 N 3883.79 9928.87 N 3979.09 10177.19 N 4072.55 E 6481.10 186.83 E 6668.09 186.99 E 6849.02 180.93 E 7033.87 184.84 E 7217.42 183.55 13849 . 13 6441.50 6400 . 00 14143 . 80 6541 . 50 6500 . 00 14429 . 40 6641 . 50 6600 . 00 14717 . 09 6741 . 50 6700 . 00 15018 . 66 6841.50 6800 . 00 10431.73 N 10689.56 N 10938.52 N 11187.58 N 11450.38 N 4169.63 4271.38 4369.19 4472.76 4581.76 E 7407.63 190.21 E 7602.30 194.68 E 7787.90 185.60 E 7975.59 187.69 E 8177.16 201.56 RRY-SUN DRILLING SERVICES ANCHOR3kGE ALASKA PAGE 10 BP EXPLORATION (ALASKA), INC. MILNE POINT / MPF-66PB1 50-029-22697-70 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/10/96 DATE OF SURVEY: 090396 JOB NUMBER: AK-MM-60110 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 15308.33 6941.50 6900.00 11702.90 N 4682.38 E 8366.83 189.67 15597.58 7041.50 7000.00 11956.32 N 4779.49 E 8556.08 189.25 15891.67 7141.50 7100.00 12214.99 N 4877.33 E 8750.17 194.09 16191.34 7241.50 7200.00 12477.86 N 4980.75 E 8949.84 199.67 16517.00 7322.00 7280.50 12776.74 N 5080.88 E 9195.00 245.15 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPEP~-Y-SUN DRILLING SERVICES ANCHORAGE ALASKA BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8183.58 4491.60 4450.10 8236.18 4511.00 4469.50 8331.47 4543.94 4502.44 8426.53 4572.89 4531.39 8521.22 4597.36 4555.86 68 15 N 21.76 E .00 5486.77N 2213.00E 68 28 N 25.45 E 6.54 5531.56N 2232.58E 71 4 N 23.16 E 3.54 5613.04N 2269.36E 73 26 N 22.93 E 2.51 5696.34N 2304.80E 76 35 N 22.71 E 3.33 5780.65N 2340.27E 5914.10 5962.90 6052.10 6142.53 6233.91 8614.84 4619.47 4577.97 8710.41 4643.24 4601.74 8805.54 4667.00 4625.50 8900.73 4690.79 4649.29 8995.78 4715.01 4673.51 76 5 N 22.02 E .91 5864.77N 2374.88E 75 6 N 21.76 E 1.06 5950.66N 2409.39E 75 58 N 21.73 E .91 6036.22N 2443.51E 75 5 N 20.97 E 1.20 6122.06N 2477.06E 75 22 N 22.23 E 1.31 6207.52N 2510.89E 6324.83 6417.36 6509.45 6601.60 6693.49 9091.15 4739.85 4698.35 9186.38 4764.87 4723.37 9280.11 4788.69 4747.19 9374.67 4813.27 4771.77 9467.53 4837.57 4796.07 74 25 N 21.11 E 1.50 6293.08N 2544.89E 75 6 N 22.21 E 1.32 6378.47N 2578.80E 75 26 N 22.39 E .40 6462.35N 2613.20E 74 25 N 21.89 E 1.19 6546.92N 2647.60E 75 14 N 21.75 E .90 6630.12N 2680.92E 6785.54 6877.39 6968.00 7059.26 7148.85 9559.46 4860.80 4819.30 9653.02 4884.22 4842.72 9746.53 4907.18 4865.68 9839.95 4930.40 4888.90 9933.65 4953.89 4912.39 75 28 N 21.10 E .73 6712.92N 2713.41E 75 32 N 21.10 E .07 6797.43N 2746.02E 76 1 N 20.94 E .'54 6882.04N 2778.53E 75 11 N 21.16 E .91 6966.49N 2811.03E 75 45 N 21.12 E .59 7051.09N 2843.75E 7237.78 7328.36 7419.00 7509.48 7600.18 10026.48 4976.25 4934.75 10119.13 4998.86 4957.36 10213.87 5022.84 4981.34 10305.88 5045.35 5003.85 10399.32 5068.05 5026.55 76 22 N 20.89 E .71 7135.19N 2876.05E 75 22 N 20.34 E 1.22 7219.28N 2907.69E 75 18 N 20.88 E .55 7305.07N 2939.95E 76 22 N 21.30 E 1.23 7388.31N 2972.05E 75 30 N 20.83 E 1.04 7472.89N 3004.62E 7690.27 7780.11 7871.77 7960.97 8051.60 10493.62 5090.88 5049.38 10589.26 5112.67 5071.17 10684.57 5134.25 5092.75 10779.23 5156.75 5115.25 10873.72 5179.33 5137.83 76 28 N 21.30 E 1.14 7558.26N 3037.51E 77 10 N 20.77 E .91 7645.18N 3070.93E 76 40 N 20.50 E .60 7732.06N 3103.65E 75 49 N 20.11 E .97 7818.29N 3135.55E 76 31 N 21.28 E 1.41 7904.11N 3167.97E 8143.09 8236.20 8329.04 8420.98 8512.73 10969.45 5202.36 5160.86 11064.28 5225.58 5184.08 11157.78 5248.82 5207.32 11251.90 5272.28 5230.78 11346.56 5294.78 5253.28 75 38 N 21.06 E .95 7990.76N 3201.53E 76 1 N 21.32 E .49 8076.49N 3234.76E 75 11 N 20.88 E 1.00 8160.98N 3267.35E 75 56 N 21.02 E .81 8246.10N 3299.94E 76 33 N 21.29 E .71 8331.85N 3333.13E 8605.63 8697.57 8788.12 8879.27 8971.20 ORIGINAL SP5 f-SUN DRILLING SERVICES ANCHOP~AGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION' RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11441.51 5317.54 5276.04 11535.21 5340.23 5298.73 11629.63 5363.22 5321.72 11721.78 5386.07 5344.57 11813.96 5408.28 5366.78 75 42 76 15 75 33 75 43 76 22 N 20.87 E .99 8417.86N 3366.28E N 20.68 E .62 8502.86N 3398.53E N 20.36 E .81 8588.62N 3430.64E N 20.68 E .39 8672.23N 3461.94E N 20.83 E .72 8755.88N 3493.65E 9063.38 9154.28 9245.86 9335.13 9424.59 11908.43 5431.23 5389.73 12002.76 5454.02 5412.52 12096.88 5476.21 5434.71 12192.49 5499.45 5457.95 12288.24 5523.62 5482.12 75 3O 76 31 76 11 75 40 75 4 N 20.10 E 1.19 8841.73N 3525.69E N 20.99 E 1.41 8927.44N 3557.82E N 20.55 E .57 9012.96N 3590.25E N 20.03 E .76 9099.95N 3622.41E N 20.06 E .63 9186.98N 3654.16E 9516.23 9607.76 9699.22 9791.96 9884.61 12383.19 5547.65 5506.15 12479.05 5571.62 5530.12 12573.99 5594.77 5553.27 12667.61 5617.45 5575.95 12761.82 5640.90 5599.40 75 36 75 26 76 20 75 38 75 32 N 20.52 E .73 9273.14N 3686.02E N 21.36 E .87 9359.82N 3719.18E N 21.70 E 1.01 9445.47N 3752.97E N 21.34 E .84 9529.97N 3786.29E N 21.19 E .19 9615.00N 3819.38E 9976.47 10069.27 10161.33 10252.14 10343.37 12856.90 5664.13 5622.63 12952.02 5687.48 5645.98 13045.71 5710.76 5669.26 13141.29 5734.99 5693.49 13235.59 5758.78 5717.28 76 10 75 24 75 49 74 48 75 58 N 21.34 E .70 9700.92N 3852.82E N 21.27 E .82 9786.82N 3886.32E N 21.40 E .47 9871.35N 3919.34E N 21.25 E 1.08 9957.48N 3952.97E N 21.32 E 1.24 10042.50N 3986.09E 10435.56 10527.76 10618.50 10710.94 10802.17 13329.97 5781.40 5739.90 13425.04 5804.61 5763.11 13520.62 5827.94 5786.44 13613.80 5850.34 5808.84 13708.88 5874.38 5832.88 76 17 75 26 76 18 75 52 74 49 N 22.29 E 1.06 10127.56N 4020.13E N 21.90 E .99 10212.98N 4054.81E N 22.21 E .97 10298.88N 4089.62E N 21.93 E .55 10382.70N 4123.60E N 21.79 E 1.11 10468.08N 4157.85E 10893.77 10985.92 11078.57 11168.98 11260.93 13804.06 5899.11 5857.61 13898.58 5923.82 5882.32 13993.00 5948.10 5906.60 14086.65 5971.25 5929.75 14181.81 5994.67 5953.17 75 3 74 38 75 33 75 48 75 41 N 22.54 E .80 10553.19N 4192.52E N 22.84 E .55 10637.37N 4227.71E N 22.69 E .99 10721.50N 4263.02E N 21.67 E 1.09 10805.52N 4297.28E N 22.09 E .45 10891.11N 4331.66E 11352.80 11443.96 11535.13 11625.83 11718.03 14274.44 6017.54 5976.04 14369.20 6040.10 5998.60 14463.87 6062.33 6020.83 14556.20 6084.85 6043.35 14650.65 6108.92 6067.42 75 44 76 42 76 8 75 38 74 50 N 21.30 E .84 10974.51N 4364.84E N 20.68 E 1.20 11060.44N 4397.80E N 20.22 E .76 11146.66N 4429.96E N 20.32 E .55 11230.65N 4460.98E N 21.46 E 1.44 11315.98N 4493.54E 11807.77 11899.79 11991.81 12081.35 12172.67 SPE .r-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS DIRECTION DEGREES DG/10 TOTAL RECTANGULAR COORDINATES 0 NORTH/SOUTH EAST/WEST VERT. SECT· 14700.56 6121.45 6079.95 14743.56 6131.78 6090.28 14838.82 6155.15 6113.65 14932.16 6177.98 6136.48 15026.92 6201.25 6159.75 76 4 N 19.82 E 76 6 N 20.49 E 75 30 N 20.14 E 76 10 N 20.30 E 75 23 N 20.07 E 4.04 1.50 .72 .74 .87 11361.18N 4510 11400.36N 4524 11486.97N 4557 11571.89N 4588 11658.11N 4619 .56E 12220.98 .94E 12262.72 .00E 12355.06 .28E 12445.57 .97E 12537.42 15121.98 6224.39 6182.89 15215.94 6246.90 6205.40 15310.95 6270.57 6229.07 15406.04 6294.40 6252.90 15501.25 6318.10 6276.60 76 26 75 50 75 18 75 39 75 30 N 20.50 E N 20.09 E N 19.69 E N 20.21 E N 20.60 E 1.19 .77 .69 .65 .43 11744.59N 4651 11830.14N 4683 11916.67N 4714 12003.20N 4746 12089.63N 4778 .94E 12629.62 .58E 12720.84 .88E 12812.85 .29E 12904.90 .44E 12997.11 15596.09 6341.63 6300.13 15690.96 6364.85 6323.35 15786.40 6388.64 6347.14 15882.23 6412.96 6371.46 15976.80 6436.66 6395.16 75 45 75 54 75 13 75 22 75 35 N 20.99 E N 21.68 E N 21.71 E N 22.39 E N 21.67 E .48 .72 .73 .71 .77 12175.51N 4811 12261.19N 4844 12347.07N 4878 12432.98N 4913 12517.85N 4947 .06E 13088.98 .53E 13180.96 .70E 13273.36 .49E 13366.01 .83E 13457.52 16072.24 6460.24 6418.74 16167.24 6483.61 6442.11 16260.25 6506.46 6464.96 16354.61 6529.01 6487.51 16448.81 6551.38 6509.88 75 47 75 43 75 49 76 31 75 59 N 21.71 E N 22.42 E N 21.99 E N 21.81 E N 21.77 E .21 .73 .46 .77 .57 12603.78N 4982 12689.12N 5016 12772.59N 5050 12857.61N 5084 12942.57N 5118 .01E 13549.98 .59E 13642.02 .66E 13732.14 .83E 13823.73 .80E 13915.21 16544.11 6574.90 6533.40 16637.20 6598.20 6556.70 16732.70 6621.58 6580.08 16825.91 6644.19 6602.69 16921.04 6669.27 6627.77 75 26 N 22.03 E 75 34 N 20.89 E 76 5 N 21.22 E 75 49 N 20.83 E 73 35 N 19.85 E .64 1.19 .63 .49 2.55 13028.26N 5153 13112.13N 5186 13198.54N 5219 13282.95N 5251 13368.97N 5283 .25E 14007.53 .22E 14097.64 .49E 14190.22 .93E 14280.64 · 82E 14372.38 17015.01 6697.58 6656.08 17109.50 6729.74 6688.24 17201.98 6765.06 6723.56 17296.54 6805.23 6763.73 17392.17 6849.81 6808.31 71 19 68 51 66 14 63 28 60 57 N 19.08 E N 18.40 E N 18.27 E N 18·20 E N 19.09 E 2.54 2.70 2.84 2.91 2.77 13453.43N 5313 13537.54N 5342 13618.67N 5369 13699.96N 5395 13780.12N 5422 .68E 14461.96 .21E 14550.74 · 09E 14636.15 · 88E 14721.68 · 92E 14806.23 17484.24 6896.68 6855.18 17576.31 6947.40 6905.90 17671.89 7003.16 6961.66 17765.39 7061.02 7019.52 17859.80 7121.68 7080.18 57 55 53 5O 49 49 17 19 12 49 N 17.89 E N 18.24 E N 19.69 E N 20.00 E N 19.61 E 3.58 2.78 2.40 3.34 .52 13855.26N 5448 13928.28N 5471 14001.68N 5497 14070.75N 5522 14138.81N 5546 .06E 14885.42 .87E 14962.16 .09E 15039.75 .01E 15113.18 .52E 15185.51 ORIGINAL SPE '-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 17954.04 7182.81 7141.31 49 17 N 18.84 E 18049.59 7245.53 7204.03 48 39 N 18.62 E 18143.96 7308.15 7266.65 48 11 N 18.76 E 18237.45 7370.85 7329.35 47 33 N 18.68 E 18330.18 7433.74 7392.24 47 2 N 18.87 E .84 14206.54N 5570.14E 15257.22 .70 14274.80N 5593.28E 15329.27 .49 14341.68N 5615.90E 15399.83 .68 14407.35N 5638.16E 15469.15 .58 14471.88N 5660.10E 15537.27 18423.28 7497.37 7455.87 46 43 N 18.66 E .38 14536.22N 5681.96E 15605.20 18517.78 7562.29 7520.79 46 30 N 18.79 E .25 14601.26N 5704.00E 15673.84 18611.33 7626.96 7585.46 46 1 N 18.92 E .53 14665.22N 5725.85E 15741.41 18661.17 7661.63 7620.13 45 49 N 18.85 E .40 14699.10N 5737.44E 15777.20 18704.17 7691.74 7650.24 45 17 N 18.96 E 1.27 14728.14N 5747.39E 15807.89 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 15809.83 FEET AT NORTH 21 DEG. 19 MIN. EAST AT MD = 18704 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 20.42 DEG. TIE-IN SURVEY A~ 8,183.58' MD LAST SURVEY STATION AT 18,704.17' MD SPE f-SUN DRILLING SERVICES ANCHOKAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 OPER~ATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8183.58 4491.60 4450.10 5486.77 N 2213.00 E 9183.58 4764.15 4722.65 6375.97 N 2577.78 E 10183.58 5015.16 4973.66 7277.69 N 2929.51 E 11183.58 5255.41 5213.91 8184.29 N 3276.24 E 12183.58 5497.24 5455.74 9091.83 N 3619.45 E 3691.98 4419.43 727.45 5168.42 748.99 5928.17 759.74 6686.34 758.17 13183.58 5746.08 5704.58 9995.51 N 3967.76 E 7 14183.58 5995.11 5953.61 10892.70 N 4332.30 E 8 15183.58 6238.98 6197.48 11800.68 N 4672.80 E . 8 16183.58 6487.64 6446.14 12703.76 N 5022.63 E 9 17183.58 6757.72 6716.22 13602.65 N 5363.80 E 10 437.50 751.17 188.47 750.96 944.60 756.13 695.94 751.35 425.86 729.91 18183.58 7334.56 7293.06 14369.64 N 5625.40 E 10849.02 18704.17 7691.74 7650.24 14728.14 N 5747.39 E 11012.43 423.16 163.41 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. ORIGINAL SPE" '-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66A 500292269701 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 7/96 DATE OF SURVEY: 092996 JOB NUMBER: AK-EI-60139 KELLY BUSHING ELEV. = 41.50 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8183.58 4491.60 4450.10 5486.77 N 2213.00 E 3691.98 8323.99 4541.50 4500.00 5606.55 N 2266.57 E 3782.49 90.51 8703.62 4641.50 4600.00 5944.57 N 2406.96 E 4062.12 279.63 9097.30 4741.50 4700.00 6298.61 N 2547.02 E 4355.80 293.68 9482.98 4841.50 4800.00 6644.00 N 2686.45 E 4641.48 285.68 9883.41 4941.50 4900.00 7005.67 N 2826.20 E 4941.91 300.43 10289.54 5041.50 5000.00 7373.51 N 2966.28 E 5248.04 306.13 10716.03 5141.50 5100.00 7760.73 N 3114.37 E 5574.53 326.49 11129.15 5241.50 5200.00 8135.12 N 3257.49 E 5887.65 313.12 11540.54 5341.50 5300.00 8507.70 N 3400.36 E 6199.04 311.39 11949.65 5441.50 5400.00 8879.21 N 3539.45 E 6508.15 309.12 12358.45 5541.50 5500.00 9250.70 N 3677.62 E 6816.95 308.80 12764.22 5641.50 5600.00 9617.17 N 3820.22 E 7122.72 305.77 13166.12 5741.50 5700.00 9979.81 N 3961.65 E 7424.62 301.90 13577.55 5841.50 5800.00 10350.10 N 4110.47 E 7736.05 311.43 13966.55 5941.50 5900.00 10697.87 N 4253.14 E 8025.05 289.00 14375.27 6041.50 6000.00 11065.96 N 4399.89 E 8333.77 308.72 14784.01 6141.50 6100.00 11437.15 N 4538.68 E 8642.51 308.74 15193.87 6241.50 6200.00 11810.05 N 4676.23 E 8952.37 309.86 15595.55 6341.50 6300.00 12175.02 N 4810.87 E 9254.05 301.68 15996.24 6441.50 6400.00 12535.34 N 4954.78 E 9554.74 300.69 16407.98 6541.50 6500.00 12905.78 N 5104.11 E 9866.48 311.74 16814.90 6641.50 6600.00 13272.97 N 5248.13 E 10173.40 306.92 17141.42 6741.50 6700.00 13565.71 N 5351.57 E 10399.92 226.52 17374.90 6841.50 6800.00 13765.81 N 5417.99 E 10533.40 133.48 17565.94 6941.50 6900.00 13920.18 N 5469.21 E 10624.44 91.04 17734.52 7041.50 7000.00 14048.28 N 5513.86 E 10693.02 68.58 17890.52 7141.50 7100.00 14160.92 N 5554.40 E 10749.02 55.99 18043.49 7241.50 7200.00 14270.47 N 5591.82 E 10801.99 52.97 18193.91 7341.50 7300.00 14376.88 N 5627.86 E 10852.41 50.42 18341.57 7441.50 7400.00 14479.77 N 5662.80 E 10900.07 47.67 18487.58 7541.50 7500.00 14580.52 N 5696.95 E 10946.08 46.00 18632.25 7641.50 7600.00 14679.46 N 5730.73 E 10990.75 44.68 18663.58 7663.31 7621.81 14700.73 N 5738.00 E 11000.27 9.51 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS S '.~RY-SUN DRILLING SERVICES ANCHOR3kGE ALAS I¢3k PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 50~292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 OPERATOR: BP EXPLORATION FT. TRUE ST/B-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. .00 .00 -41.90 129.46 129.46 87.56 219.70 219.69 177.79 310.17 310.15 268.25 401.29 401.25 359.35 0 0 N .00 E .00 .00N .00E 0 28 S 69.60 E .36 .19S .50E 0 34 S 65.06 E .12 .50S 1.26E 1 2 S 82.99 E .59 .80S 2.49E 1 41 N 82.34 E .80 .72S 4.65E .00 -.04 -.14 - .08 .60 492.39 492.29 450.39 582.84 582.64 540.74 673.61 673.21 631.31 765.63 764.83 722.93 855.64 854.15 812.25 2 14 N 77.01 E .63 .14S 7.72E 3 7 N 73.55 E 1.00 .96N ll.81E 4 20 N 64.15 E 1.50 3.16N 17.28E 6 13 N 53.58 E 2.29 7.64N 24.43E 7 53 N 46.44 E 2.08 14.79N 32.83E 2.01 4.19 7.82 14.11 23.31 947.52 944.79 902.89 1043.35 1038.60 996.70 1139.03 1131.72 1089.82 1234.17 1223.86 1181.96 1329.81 1315.90 1274.00 10 52 N 41.34 E 3.37 25.64N 43.12E 12 39 N 42.77 E 1.88 40.13N 56.22E 13 53 N 41.52 E 1.33 56.42N 70.94E 14 55 N 41.31 E 1.09 74.17N 86.60E 16 34 N 38.69 E 1.88 94.07N 103.25E 36.59 54.14 73.87 95.27 119.00 1425.41 1406.90 1365.00 1521.05 1496.54 1454.64 1616.65 1585.53 1543.63 1712.11 1674.41 1632.51 1807.10 1762.13 1720.23 19 5 N 35.06 E 2.88 117.51N 120.76E 21 44 N 29.07 E 3.52 145.81N 138.36E 21 7 N 26.75 E 1.10 176.66N 154.71E 21 41 N 27.21 E .63 207.70N 170.52E 23 23 N 24.53 E 2.09 240.47N 186.37E 146.38 178.44 212.61 246.82 282.70 1902.65 1849.14 1807.24 1998.30 1934.33 1892.43 2093.61 2016.61 1974.71 2189.35 2096.37 2054.47 2284.97 2172.89 2130.99 25 22 N 20.68 E 2.66 276.88N 201.48E 28 41 N 20.96 E 3.47 317.51N 216.94E 31 53 N 19.13 E 3.50 362.69N 233.38E 35 14 N 17.91 E 3.56 412.88N 250.17E 38 25 N 18.34 E 3.34 467.35N 268.01E 321.87 365.20 413.16 466.04 523.32 2380.84 2247.04 2205.14 2476.46 2318.65 2276.75 2571.93 2386.69 2344.79 2667.57 2451.06 2409.16 2763.37 2511.74 2469.84 40 13 N 18.79 E 1.91 524.94N 287.35E 42 46 N 19.68 E 2.73 584.75N 308.24E 46 18 N 20.27 E 3.73 647.67N 331.12E 49 4 N 20.88 E 2.93 713.88N 355.99E 52 18 N 20.36 E 3.39 783.25N 382.08E 584.01 647.27 714.07 784.58 858.46 2858.22 2568.56 2526.66 2954.08 2623.20 2581.30 3047.71 2673.30 2631.40 3142.23 2720.90 2679.00 3237.01 2766.47 2724.57 54 5 N 20.33 E 1.88 854.44N 408.48E 56 23 N 20.03 E 2.41 928.35N 435.64E 58 54 N 20.23 E 2.70 1002.59N 462.85E 60 37 N 20.60 E 1.85 1079.11N 491.34E 61 53 N 21.36 E 1.51 115~9,Ni- ~521--.~_0E 934.18 1012.72 1091.59 1173.01 1255.80 ORt61NAL £~-~'RRY-SUN DRILLING SERVICES ANCHORAGE DJ_JtS KA PAGE 2 BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTIC~LL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3331.41 2809.23 2767.33 64 13 3426.63 2848.51 2806.61 67 1 3522.08 2883.87 2841.97 69 28 3617.87 2916.86 2874.96 70 13 3713.28 2949.43 2907.53 69 50 N 21.41 E 2.48 1235.04N 551.78E N 21.25 E 2.94 1315.82N 583.33E N 20.64 E 2.64 1398.60N 615.01E N 19.89 E 1.07 1482.96N 646.16E N 20.22 E .51 1567.20N 676.92E 1339.58 1425.95 1514.27 1603.95 1693.42 3808.24 2982.05 2940.15 69 58 3903.94 3014.57 2972.67 70 18 3999.19 3046.80 3004.90 70 7 4094.89 3080.89 3038.99 68 8 4190.50 3116.00 3074.10 68 46 N 21.03 E .81 1650.66N 708.33E N 20.85 E .40 1734.72N 740.50E N 20.42 E .47 1818.60N 772.09E N 21.75 E 2.44 1902.02N 804.25E N 21.62 E .68 1984.66N 837.11E 1782.31 1872.00 1961.34 2050.41 2138.91 4286.10 3150.56 3108.66 68 49 4381.87 3184.84 3142.94 69 13 4477.42 3218.38 3176.48 69 40 4572.94 3251.48 3209.58 69 46 4668.64 3284.56 3242.66 69 46 N 21.53 E .10 2067.54N 869.89E N 21.16 E .55 2150.83N 902.43E N 21.05 E .49 2234.30N 934.65E N 21.38 E .33 2317.83N 967.07E N 21.69 E .30 2401.36N 1000.03E 2227.64 2316.69 2405.81 2495.06 2584.45 4763.67 3317.17 3275.27 70 5 4859.51 3349.92 3308.02 69 57 4953.77 3381.85 3339.95 70 27 5048.30 3413.33 3371.43 70 38 5142.92 3444.39 3402.49 71 1 N 21.48 E .38 2484.37N 1032.86E N 21.44 E .14 2568.19N 1065.81E N 21.41 E .54 2650.75N 1098.20E N 21.00 E .45 2733.85N 1130.45E N 21.10 E .42 2817.26N 1162.55E 2673.30 2762.98 2851.28 2940.06 3029.10 5237.76 3475.41 3433.51 70 47 5331.83 3506.47 3464.57 70 38 5427.44 3538.42 3496.52 70 18 5520.62 3569.74 3527.84 70 24 5586.00 3591.64 3549.74 70 27 N 21.04 E .26 2900.89N 1194.77E N 20.61 E .46 2983.89N 1226.33E N 22.13 E 1.54 3067.80N 1259.16E N 22.27 E .18 3149.05N 1292.32E N 22.14 E .21 3206.09N 1315'.60E 3118.39 3206.88 3296.60 3383.86 3445.11 5616.10 3601.72 3559.82 5711.12 3633.76 3591.86 5806.20 3665.84 3623.94 5901.02 3697.40 3655.50 5996.72 3729.09 3687.19 70 24 70 11 70 22 70 43 70 35 N 22.14 E .22 3232.36N 1326.29E N 22.08 E .23 3315.24N 1359.96E N 21.78 E .35 3398.26N 1393.38E N 21.67 E .39 3481.32N 1426.48E N 22.13 E .48 3565.11N 1460.16E 3473.32 3562.28 3651.32 3740.30 3830.14 6091.39 3760.51 3718.61 70 37 6186.80 3792.14 3750.24 70 39 6282.42 3824.11 3782.21 70 15 6376.75 3857.12 3815.22 68 45 6471.86 3891.86 3849.96 68 23 N 21.81 E .32 3647.92N 1493.58E N 21.28 E .53 3731.65N 1526.63E N 21.10 E .45 3815.67N 1559.21E N 21.38 E 1.61 3898.03N 1591.21E N 20.99 E .55 3980.58N 1623.20E 3918.97 4008.57 4098.33 4186.33 4274.52 S?=RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6566.79 3926.19 3884.29 69 12 N 21.51 E 1.01 4063.07N 1655.28E 6662.26 3959.98 3918.08 69 20 N 21.36 E .20 4146.18N 1687.91E 6757.42 3993.71 3951.81 69 8 N 22.88 E 1.50 4228.61N 1721.41E 6851.94 4027.21 3985.31 69 20 N 22.05 E .84 4310.29N 1755.18E 6946.43 4059.68 4017.78 70 27 N 22.13 E 1.19 4392.51N 1788.54E 4362.66 4451.57 4540.05 4627.88 4716.13 7040.53 4091.43 4049.53 70 6 N 21.94 E .42 4474.62N 1821.77E 7135.24 4123.47 4081.57 70 21 N 22.07 E .29 4557.25N 1855.16E 7165.29 4133.64 4091.74 70 4 N 21.65 E 1.61 4583.50N 1865.69E 7229.29 4155.45 4113.55 70 4 N 21.76 E .16 4639.40N 1887.94E 7323.69 4187.80 4145.90 69 50 N 21.54 E .33 4721.83N 1920.66E 4804.23 4892.89 4921.02 4980.90 5069.17 7418.40 4220.67 4178.77 69 32 N 21.43 E .34 4804.48N 1953.19E 7512.41 4253.94 4212.04 69 0 N 20.99 E .72 4886.45N 1984.99E 7607.31 4287.34 4245.44 69 46 N 21.42 E .92 4969.26N 2017.12E 7699.95 4319.75 4277.85 69 16 N 20.95 E .72 5050.18N 2048.49E 7794.53 4353.68 4311.78 68 40 N 20.73 E .66 5132.69N 2079.89E 5157.60 5245.17 5333.64 5420.08 5508.06 7889.93 4388.10 4346.20 69 1 N 21.64 E .96 5215.64N 2112.05E 7982.05 4421.51 4379.61 68 26 N 21.50 E .64 5295.48N 2143.61E 8077.72 4456.29 4414.39 68 55 N 21.82 E .59 5378.31N 2176.50E 8250.00 4518.25 4476.35 68 55 N 21.82 E .01 5527.55N 2236.24E 5596.68 5682.14 5770.84 5930.79 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5962.77 FEET AT NORTH 22 DEG. 1 MIN. EAST AT MD = 8250 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 16.09 DEG. PROJECTED SURVEY AT 8,250.00' MD S ~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -41.90 .00 N .00 E 1000.00 996.30 954.40 33.16 N 49.77 E 2000.00 1935.82 1893.92 318.28 N 217.23 E 3000.00 2648.63 2606.73 964.28 N 448.73 E 4000.00 3047.08 3005.18 1819.31 N 772.36 E .00 3.70 3.70 64.18 60.48 351.37 287.19 952.92 601.55 5000.00 3397.31 3355.42 2691.31 N 1114.11 E 6000.00 3730.18 3688.28 3567.98 N 1461.33 E 7000.00 4077.64 4035.74 4439.27 N 1807.53 E 8000.00 4428.10 4386.20 5311.01 N 2149.72 E 8250.00 4518.25 4476.35 5527.55 N 2236.24 E 1602.69 649.76 2269.82 667.14 2922.36 652.54 3571.90 649.53 3731.75 159.86 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. 'RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -41.90 41.90 41.90 .00 141.90 141.90 100.00 241.91 241.90 200.00 341.92 341.90 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .22 S .59 E .00 .00 .60 S 1.46 E .01 .00 .87 S 3.07 E .02 .01 441.96 441.90 400.00 542.04 541.90 500.00 642.21 641.90 600.00 742.57 741.90 700.00 843.28 841.90 800.00 .55 S 5.86 E .33 N 9.67 E 2.12 N 15.14 E 6.15 N 22.42 E 13.62 N 31.60 E .06 .04 .14 .08 .31 .17 .67 .36 .38 .71 944.58 941.90 900.00 1046.73 1041.90 1000.00 1149.52 1141.90 1100.00 1252.84 1241.90 1200.00 1356.99 1341.90 1300.00 25.23 N 42.76 E 2 40.67 N 56.72 E 4 58.30 N 72.61 E 7 77.78 N 89.77 E 10 100.31 N 108.14 E 15 .68 1.30 .83 2.16 .62 2.79 .94 3.32 .09 4.15 1462.56 1441.90 1400.00 1569 . 86 1541 . 90 1500 . 00 1677 . 13 1641 . 90 1600 . 00 1785 . 06 1741 . 90 1700 . 00 1894 . 64 1841 . 90 1800 . 00 127.88 N 127.68 E 161.59 N 147.04 E 196.21 N 164.61 E 232.51 N 182.74 E 273.67 N 200.27 E 20.66 5.57 27.96 7.30 35.23 7.27 43.16 7.93 52.74 9.58 2006.96 1941.90 1900.00 2123.58 2041.90 2000.00 2245.78 2141.90 2100.00 2374.10 2241.90 2200.00 2508.47 2341.90 2300.00 321.44 N 218.43 E 377.90 N 238.59 E 444.57 N 260.49 E 520.82 N 285.95 E 605.45 N 315.69 E 65 81 103 132 166 .06 12.33 .68 16.62 .88 22.20 .20 28.32 .57 34.37 2653.67 2441.90 2400.00 2812.93 2541.90 2500.00 2987.85 2641.90 2600.00 3185.15 2741.90 2700.00 3409.91 2841.90 2800.00 704.11 N 352.27 E 820.12 N 395.76 E 954.77 N 445.27 E 1114.13 N 504.54 E 1301.51 N 577.76 E 211 271 345 443 568 .77 45.20 .03 59.26 .95 74.92 .25 97.30 .01 124.76 3691.42 2941.90 2900.00 3984.77 3041.90 3000.00 4262.12 3141.90 3100.00 4545.22 3241.90 3200.00 4836.10 3341.90 3300.00 1547.95 N 669.82 E 1805.89 N 767.36 E 2046.75 N 861.68 E 2293.61 N 957.59 E 2547.73 N 1057.77 E 749.52 942.87 1120.22 1303.32 1494.20 181.51 193.35 177.36 183.10 190.88 RRY-SI/N DRILLING SERVICES ANCHORAGE ALASKA PAGE BP EXPLORATION (ALASKA) INC MILNE POINT/MPF-66 500292269700 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/ 6/96 DATE OF SURVEY: 082696 JOB NUMBER: AK-EI-60119 KELLY BUSHING ELEV. = 41.90 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTAi~GULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 5135.25 3441.90 3400.00 2810.50 N 1159.94 E 5437.76 3541.90 3500.00 3076.80 N 1262.82 E 5735.14 3641.90 3600.00 3336.17 N 1368.45 E 6035.29 3741.90 3700.00 3598.81 N 1473.87 E 6334.54 3841.90 3800.00 3861.36 N 1576.88 E 1693.35 199.15 1895.86 202.51 2093.24 197.38 2293.39 200.15 2492.64 199.25 6611.07 3941.90 3900.00 4101.58 N 1670.46 E 6893.60 4041.90 4000.00 4346.42 N 1769.81 E 7189.54 4141.90 4100.00 4604.68 N 1874.10 E 7478.79 4241.90 4200.00 4857.14 N 1973.75 E 7762.13 4341.90 4300.00 5104.46 N 2069.21 E 2669.17 176.53 2851.70 182.53 3047.64 195.93 3236.89 189.25 3420.23 183.34 8037.74 4441.90 4400.00 5343.68 N 2162.64 E 3595.84 8250.00 4518.25 4476.35 5527.55 N 2236.24 E 3731.75 175.61 135.91 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS gyro/data F-PAD WELL NO:MPF-66A MILNE POINT, NORTH SLOPE, ALASKA Gyro Multishot Survey Inside 7" Casing Survey date · 10 - OCT, 1996 Job number :AKlO9eCr~u R I G I N A L JUL 2_,_8 ~g~7 ¢iJ ,& 6as cons, oornmis,~',, ~nch0rag~ SR366.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 October 18, 1996 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, Well No: MPF-66A, Milne Point, North Slope AK Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed survey of Well #MPF-66A We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the future. Since~ Jack E~. ]May. _ _/ Asst. Operations Ivl/anager JEMYfec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK1096C366 1. DISCUSSION, SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR366.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR366.DOC gyro/data DISCUSSION JOB NUMBER ' AK1096C366 Tool 750 was run in WELL# MPF-66A on ATLAS 15/32" Wireline inside casing, survey was run without problems. SR366.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER ' AK1096C366 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations' for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR366.DOC gyro/data 2. SURVEY DETAILS SR366.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK1096C366 CLIENT: B.P. EXPLORATION RIG: .ATLAS WIRELINE LOCATION: MILNE POINT FIELD, ALASKA WELL: MPF-66A LATITUDE: 70.505 N LONGITUDE: 149.5 W SURVEY DATE: 16,OCT 1996 SURVEY TYPE : MULTISHOT IN 7 IN. CASING DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 41.5 15140 SURVEY TIED ONTO: NA SURVEY INTERVAL: 0'-15140' 50' UTM CO-ORDINATES: TARGET DIRECTION: 20.42 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD SR366.DOC gyro/data 3. OUTRUN SURVEY LISTING SR366.DOC A Gyroda t a D i re c t i ona i Survey for B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" CASING Location: , MILNE POINT, ALASKA Job Number: AK1096C366 Run Date: 16-Oct-96 17:01:15 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 41 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 20.420 deg Vertical Section Calculated from Well Head Location' Closure' Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 A Gy r o d a t a CAS ING ALASKA Directional Survey MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -41.0 (0'- 15140'.) A GYRO MULTISHOT SURVEY IN 7" CASING . MEASURED DEPTHS ARE REFERENCED TO THE ORIGINAL R.K.B. 0.00 0.0 0.0 OF 41 FT. ELEVATION. Page 1 HORIZONTAL COORDINATES feet 0.00 N 0.00 E 60.0 .09 83.80 i 60.0 .0 19.0 160.0 .42 81.69 160.0 .2 119.0 260.0 .94 129.16 260.0 .1 219.0 360.0 1.09 90.44 360.0 .2 319.0 460.0 2.27 74.47 459.9 1.7 418.9 560.0 2.96 83.00 559.8 4.0 518.8 660.0 4.12 64.08 659.6 7.8 618.6 760.0 6.03 54.52 759.2 14.8 718.2 860.0 8.59. 46.68 858.4 25.8 817.4 960.0 11.63 44.43 956.9 41.7 915.9 1060.0 12.92 44.79 1054.6 61.1 1013.6 1160.0 14.23 43.46 1151.8 82.6 1110.8 1260.0 15.65 41.98 1248.4 106.5 1207.4 1360.0 18.09 38.00 1344.1 133.8 1303.1 1460.0 20.76 32.80 1438.4 166.0 1397.4 1560.0 20.79 30.16 1531.9 200.8 1490.9 1660.0 21.40 29.38 1625.2 236.3 1584.2 1760.0 22.88 26.76 1717.8 273.6 1676.8 1860.0 25.07 22.91 1809.2 314.1 1768.2 1960.0 28.44 22.30 1898.5 359.1 1857.5 · 15 .0 83.8 .33 .5 82.2 · 72 1.5 104.8 .69 3.2 106.6 1.26 5.9 93.8 · 79 10.4 87.5 1.63 16.3 81.8 2.09 24.7 73.6 2.74 36.7 65.6 3.06 53.5 59.1 1.29 74.3 55.0 1.34 97.4 52.4 1.48 122.9 50.4 2.69 151.5 48.4 3.18 184.0 46.0 .94 218.5 43.7 .67 253.6 41.7 1.78 290.3 40.0 2.68 329.7 38.1 3.38 373.3 36.3 .01 N .05 E .07 N .49 E .40 S 1.49 E .92 S 3.07 E .40 S 5.93 E .45 N 10.39 E 2.33 N 16.18 E 6.95 N 23.69 E 15.13 N 33.41 E 27.46 N 45.90 E 42.59 N 60.84 E 59.45 N 77.17 78.40 N 94.65 ~. 100.66 N 113.23 E 127.80 N 132.39 E 158.04 N 150.91 E 189.28 N 168.77 E 222.54 N 186.48 E 259.42 N 203.48 E 300.98 N 220.77 E Gyrodata Di B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet 2010.0 30.58 21.17 1942.0 2060.0 31.67 20.80 1984.8 2110.0 34.15 20.00 2026.8 2160.0 35.40 19.88 2067.8 2210.0 37.57 19.87 2108.0 2260.0 38.78 19.84 2147.3 2310.0 39.70 20.08 2186.1 2360.0 40.83 20.26 2224.2 2410.0 42.28 20.78 2261.6 2460.0 43.69 21.09 2298.2 2510.0 45.70 21.36 2333.7 2560.0 47.36 21.44 2368.1 2610.0 48.74 21.60 2401.6 2660.0 50.35. 21.67 2434.0 2710.0 51.99 21.48 2465.4 2760.0 53.22 21.29 2495.7 2810.0 54.24 21.33 2525.3 2860.0 55.46 21.21 2554.1 2910.0 56.53 21.10 2582.0 2960.0 58.46 20.99 2608.9 3010.0 59.18 21.12 2634.8 3060.0 60.42 21.08 2660.0 3110.0 61.10 21.26 2684.4 3160.0 62.22 21.48 2708.1 3210.0 61.73 22.04 2731.6 r e c t i o n a 1 DOGLEG SEVERITY DIST. deg. / feet 100 ft. Page 2 CLOSURE C,~,~ ' ~i~ O~/R~ I Z O N T A L AZIMUTH C O ~g9 R D I N A T E S deg. ~.~,m'~ feet 383.7 1901.0 4.42 397.2 409.6 1943.8 2.21 422.2 436.7 1985.8 5.04 448.6 465,2 2026.8 2.50 476.4 495.0 2067.0 4.34 505.4 525.9 2106.3 2.42 535.6 557.5 2145.1 1.86 566.7 589.8 2183.2 2.27 598.5 623.0 2220.6 2.98 631.2 657.1 2257.2 2.85 664.9 692.2 2292.7 4.04 699.7 728.5 2327.1 3.32 735.7 765.7 2360.6 2.77 772.7 803.7 2393.0 3.22 810.5 842.7 2424.4 3.29 849.2 882.4 2454.7 2.48 888.7 922.7 2484.3 2.04 928.8 963.6 2513.1 2.45 969.5 1005.0 2541.0 2.15 1010.8 1047.2 2567.9 3.86 1052.7 1089.9 2593.8 1.46 1095.3 1133.2 2619.0 2.48 1138.4 1176.8 2643.4 1.40 1181.9 1220.8 2667.1 2.27 1225.8 1264.9 2690.6 1.39 1269.8 35.4 323.86 N 229.88 E 34.5 347.99 N 239.14 E 33.7 373.45 N 248.60 E 32.8 400.26 N 258.32 32.1 428.22 N 268.43 E 31.4 457.28 N 278.93 E 30.7 487.01 N 289.72 E 30.2 517.34 N 300.87 E 29.7 548.41 N 312.49 E 29.2 580.24 N 324.68 E 28.8 613.02 N 337.41 E 28.5 646.81 N 350.65 E 28.1 681.40 N 364.29 E 27.8 716.76 N 378.32 E 27.5 752.98 N 392.64 E 27.3 789.97 N 407.12 E 27.0 827.53 N 421.77 - 26.8 865.62 N 436.60 ~ 26.5 904.28 N 451.56 E 26.3 943.63 N 466.70 E 26.1 983.55 N 482.07 E 25.9 1023.87 N 497.63 E 25.7 1064.55 N 513.38 E 25.6 1105.53 N 529.42 E 25.5 1146.53 N 545.78 E A GYro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" 'cASING Location: , MILNE POINT, ALASKA Job Number: AK1096C366 : MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet · VERTICAL SECTION feet SUBSEA DEPTH feet DOGLEG cLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. Page 3 HORIZONTAL COORDINATES feet 3260.0 63.57 22.16 2754.6 3310.0 64.82 22.02 2776.3 3360.0 64.70 22.04 2797.7 3410.0 67.87 21.84 2817.8 3460.0 69.20 21.53 2836.1 1309.3 1354.3 1399.5 1445.2 1491.8 2713.6 3.69 1314.1 25.3 2735.3 2.51 1359.1 25.2 2756.7 .24 1404.2 25.1 2776.8 6.35 1449.9 25.0 2795.1 2.72 1496.4 24.9 1187.67 N 562.49 E 1229.38 N 579.42 E 1271.31 N 596.38 E 1313.76 N 613.48 1357.00 N 630.67 E 3510.0 69.98 21.06 2853.5 3560.0 68.75 20.62 2871.1 3610.0 69.20 20.63 2889.1 3660.0 69.46 20.74 2906.7 3710.0 69.33 21.31 2924.3 3760.0 69.34 21.37 2941.9 3810.0 70.27 21.26 2959.2 3860.0 70.18 21.48 2976.1 3910.0 69.84 21.46 2993.2 3960.0 70'.59 21.57 3010.1 1538.6 1585.4 1632.1 1678.9 1725.7 1772.4 1819.4 1866.4 1913.4 1960.4 2812.5 1.79 1543.2 24.8 2830.1 2.59 1589.8 24.7 2848.1 .90 1636.4 24.6 2865.7 .56 1683.1 24.5 2883.3 ~1.10 1729.8 24.4 2900.9 .11 1776.5 24.3 2918.2 1.87 1823.4 24.2 2935.1 .45 1870.4 24.2 2952.2 .68 1917.3 24.1 2969.1 1.51 1964.3 24.0 1400.66 N 647.69 E 1444.39 N 664.34 E 1488.07 N 680.78 E 1531.84 N 697.30 E 1575.52 N 714.09 E 1619.10 N 731.12 E 1662.81 N 748.18 E 1706.63 N 765.32 E 1750.36 N 782.52 E 1794.13 N 799.77 E 4010.0 69.73 21.59 3027.1 4060.0 68.14 22.06 3045.1 4110.0 67.94 22.32 3063.8 4160.0 68.55 22.22 3082.3 4210.0 68.64 22.19 3100.6 2007.4 2054.1 2100.4 2146.9 2193.4 2986.1 3004.1 3022.8 3041.3 3059.6 1.72 2011.3 24.0 3.30 2057.9 23.9 .63 2104.3 23.9 1.23 2150.7 23.8 .19 2197.2 23.8 1837.86 N 817.07 E 1881.18 N 834.42 1924.11 N 851.93 ~ 1967.09 N 869.53 E 2010.19 N 887.12 E 4260.0 68.96 22.06 3118.6 4310.0 68.58 21.86 3136.7 4360.0 69.27 21.93 3154.7 4410.0 69.98 21.89 3172.1 4460.0 69.22 22.00 3189.6 2240.0 2286.6 2333.2 2380.1 2426.9 3077.6 .68 2243.8 23.8 3095.7 .85 2290.4 23.7 3113.7 1.39 2337.0 23.7 3131.1 1.42 2383.9 23.7 3148.6 1.53 2430.7 23.6 2053.37 N 904.68 E 2096.60 N 922.11 E 2139.89 N 939.51 E 2183.37 N 957.00 E 2226.84 N 974.51 E A Gyroda t a D i re c t i ona I Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet 4510.0 70.00 22.08 3207.0 4560.0 69.77 22.25 3224.2 4610.0 69.94 22.27 3241.4 4660.0 70.17 22.29 3258.5 4710.0 69.87 22.09 3275.5 VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. 2473.8 3166.0 1.57 2477.6 23.6 2520.7 3183.2 .56 2524.5 23.6 2567.6 3200.4 .34 2571.5 23.6 2614.6 3217.5 .46 2618.4 23.5 2661.5 3234.5 .71 2665.4 23.5 HORIZONTAL COORDINATES feet 2270.28 N 992.10 E 2313.76 N 1009.81 E 2357.21 N 1027.59 m 2400.70 N 1045.41 2444.21 N 1063.16 E 4760.0 70.40 22.14 3292.5 4810.0 68.96 22.00 3309.9 4860.0 70.22 21.92 3327.3 4910.0 69.66 ' 21.82 3344.5 4960.0 70.32 21.83 3361.6 2708.6 3251.5 1.06 2712.4 23.5 2755.4 3268.9 2.89 2759.3 23.5 2802.3 3286.3 2.52 2806.1 23.4 2849.2 3303.5 1.14 2853.1 23.4 2896.2 3320.6 1.32 2900.1 23.4 2487.77 N 1080.86 E 2531.22 N 1098.48 E 2574.68 N 1116.00 E 2618.27 N 1133.50 E 2661.88 N 1150.96 E 5010.0 70.24 21.71 3378.5 5060.0 70.90 21.64 3395.1 5110.0 71.73 21.62 3411.1 5160.0 70.99. 21.45 3427.1 5210.0 70.33 21.31 3443.6 5260.0 70.17 21.02 3460.5 5310.0 70.15 20.95 3477.5 5360.0 70.76 21.13 3494.2 5410.0 70.63 22.41 3510.8 5460.0 69.69 22.63 3527.7 2943.2 3337.5 .28 2947.1 23.4 2990.4 3354.1 1.33 2994.2 23.3 3037.7 3370.1 1.66 3041.6 23.3 3085.1 3386.1 1.51 3088.9 23.3 3132.3 3402.6 1.35 3136.1 23.2 3179.3 3419.5 .63 3183.1 23.2 3226.4 3436.5 .14 3230.1 23.2 3273.5 3453.2 1.27 3277.2 23.2 3320.6 3469.8 2.43 3324.4 23.1 3367.6 3486.7 1.93 3371.4 23.1 2705.60 N 1168.42 E 2749.41 N 1185.84 E 2793.44 N 1203.29 E 2837.51 N 1220.69 E 2881.44 N 1237.88 E 2925.33 N 1254.88 E 2969.24 N 1271.72 ~, 3013.22 N 1288.64 ~ 3057.04 N 1306.14 E 3100.49 N 1324.15 E 5510.0 70.37 22.57 3544.8 5560.0 69.93 22.61 3561.8 5610.0 70.06 22.42 3578.9 5660.0 69.57 22.32 3596.2 5710.0 70.58 22.39 3613.2 3414.6 3503.8 1.36 3418.4 23.1 3461.6 3520.8 .88 3465.4 23.1 3508.6 3537.9 .44 3512.4 23.1 3555.5 3555.2 1.00 3559.3 23.1 3602.4 3572.2 2.02 3606.3 23.1 3143.87 N 1342.21 E 3187.29 N 1360.27 E 3230.69 N 1378.27 E 3274.09 N 1396.13 E 3317.56 N 1414.00 E A Gyrodat a Di re c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 C'ASING ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 10.0 ft. HORIZONTAL COORDINATES feet 5760.0 69.72 22.27 3630.2 5810.0 69.96 22.29 3647.4 5860.0 70.90 22.20 3664.1 5910.0 70.57 22.40 3680.6 5960.0 70.82 22.50 3697.2 3649.4 3589.2 1.73 3653.4 23.1 3696.3 3606.4 .48 3700.3 23.1 3743.4 3623.1 1.89 3747.4 23.1 3790.6 3639.6 .76 3794.6 23.0 3837.8 3656.2 .53 3841.8 23.0 3361.07 N 3404.50 N 3448.10 N 3491.77 N 3535.39 N 1431.87 E 1449.67 E 1467.50 ~ 1485.41 1503.43 E 6010.0 70.13 22.34 3713.9 6060.0 70.53 22.19 3730.7 6110.0 70.17 22.18 3747.5 6152.7 70.52 21.79 3761.9 6202.7 70.21 21.64 3778.7 3884.9 3672.9 1.41 3888.9 23.0 3931.9 3689.7 .85 3936.0 23.0 3979.0 3706.5 .72 3983.1 23.0 4019.2 3720.9 1.19 4023.3 23.0 4066.2 3737.7 .68 4070.3 23.0 3578.95 N 3622.52 N 3666.12 N 3703.43 N 3747.12 N 1521.41 E 1539.25 E 1557.03 E 1572.09 E 1589.49 E 6252.6 70.25 21.68 3795.6 6302.5 69.03 21.31 3'812.9 6352.4 68.30 21.42 3831.1 6402.4 68.34· 21.56 3849.5 6452.3 69.27 21.63 3'867.6 4113.2 3754.6 .11 4117.3 23.0 4160.0 3771.9 2.54 4164.1 23.0 4206.5 3790.1 1.48 4210.6 22.9 4252.9 3808.5 .27 4256.9 22.9 4299.4 3826.6 1.87 4303.5 22.9 3790.79 N 3834.34 N 3877.65 N 3920.82 N 3964.11 N 1606.83 E 1623.98 E 1640.92 E 1657.92 E 1675.05 E 6502.2 69.54 21.94 3885.2 6552.2 68.28 21.78 3903.1 6602.1 67.63 21.60 3921.9 6652.0 69.68 22.40 3940.0 6701.9 69.08 22.85 3957.6 4346.2 3844.2 .79 4350.2 22.9 4392.7 3862.1 2.54 4396.8 22.9 4439.0 3880.9 1.34 4443.1 22.9 4485.5 3899.0 4.37 4489.6 22.9 4532.2 3916.6 1.47 4536.3 22.9 4007.51 N 4050.74 N 4093.74 N 4136.86 N 4179.99 N 1692.40 E 1709.74 1726.85 m 1744.27 E 1762.25 E 6751.9 68.69 22.83 3975.6 6801.8 69.39 22.73 3993.5 6851.7 69.89 22.99 4010.8 6901.7 69.48 22.91 4028.2 6951.6 70.43 22.75 4045.3 4578.7 3934.6 .78 4582.9 22.9 4625.3 3952.5 1.41 4629.5 22.9 4672.1 3969.8 1.11 4676.3 22.9 4718.8 3987.2 .83 4723.1 22.9 4765.7 4004.3 1.93 4770.0 22.9 4222.92 N 4265.90 N 4309.04 N 4352.16 N 4395.38 N 1780.33 E 1798.38 E 1816.56 E 1834.82 E 1853.02 E A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. ,,, HORIZONTAL COORDINATES feet 7001.5 70.75 22.59 4061.9 7051.4 70.15 22.50 4078.6 7101.4 71.10 22.50 4095.2 7151.3 69.97 22.27 4111.8 '7201.2 70.71 22.24 4~128.6 7251.2 69.58 22.15 4145.5 7301.1 69.51 22.01 4163.0 7351.0 69.37 21.73 4180.5 7401.0 69.23 21.76 4198.2 7450.9 68.49 21.56 4216.2 7500.8 68.64 21.84 4234.4 7550.7 70.00 22.06 4252.1 7600.7 69.29 21.86 4269.4 7650.6 69.03~ 21.63 4287.2 7700.5 69.22 21.37 4305.0 4812.8 4020.9 .71 4817.1 22.9 4859.8 4037.6 1.21 4864.2 22.9 4906.8 4054.2 1.90 4911.3 22.9 4953.9 4070.8 2.30 4958.3 22.8 5000.9 4087.6 1.48 5005.4 22.8 5047.8 4104.5 2.27 5052.3 22.8 5094.6 4122.0 .30 5099.1 22.8 5141.3 4139.5 .60 5145.8 22.8 5188.0 4157.2 .29 5192.5 22.8 5234.6 4175.2 1.53 5239.1 22.8 5281.0 4193.4 .60 5285.6 22.8 5327.7 4211.1 2.75 5332.3 22.8 5374.5 4228.4 1.47 5379.1 22.8 5421.2 4246.2 .68 5425.7 22.8 5467.8 4264.0 .62 5472.4 22.8 4438.84 N 4482.29 N 4525.81 N 4569.34 N 4612.85 N 4656.33 N 4699.68 N 4743.07 N 4786.45 N 4829.73 N 4872.91 N 4916.24 N 4959.65 N 5002.99 N 5046.40 N 1871.17 E 1889.21 E 1907.24 ~ 1925.16 1942.97 E 1960.71 E 1978.30 E 1995.71 E 2013.01 E 2030.20 E 2047.39 E 2064.85 E 2082.35 E 2099.64 E 2116.74 E 7750.5 69.09 21.50 4322.8 7800.4 69.52 22.07 4340.4 7850.3 68.80 22.10 4358.2 7900.2 68.73 22.02 4376.2 7950.2 68.65 22.03 4394.4 5514.5 4281.8 .36 5519.0 22.7 5561.2 4299.4 1.37 5565.7 22.7 5607.8 4317.2 1.44 5612.4 22.7 5654.3 4335.2 .20 5658.9 22.7 5700.8 4353.4 .16 5705.4 22.7 5089.83 N 5133.21 N 5176.44 N 5219.58 N 5262.70 N 2133.79 E 2151.12 2168.67 ~ 2186.15 E 2203.59 E 8000.1 68.30 22.46 4412.7 8050.0 69.19 22.38 4430.8 8100.0 69.15 22.22 4448.6 8149.9 68.29 22.10 4466.7 8199.8 68.41 22.47 4485.1 5747.2 4371.7 1.06 5751.9 22.7 5793.8 4389.8 1.79 5798.4 22.7 5840.4 4407.6 .31 5845.1 22.7 5886.9 4425.7 1.74 5891.6 22.7 5933.3 4444.1 .73 5938.0 22.7 5305.69 N 5348.70 N 5391.88 N 5434.97 N 5477.91 N 2221.18 E 2238.92 E 2256.63 E 2274.18 E 2291.78 E A Gyr oda t a D i r e c t iona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet 'deg. 100 ft. HORIZONTAL COORDINATES feet 8249.8 8299.7 8349.6 8399.5 8449.5 70.34 22.19 4502.7 72.55 22.00 4518.6 71.57 21.47 4534.0 72.53 21.36 4549.3 75.69 21.11 4563.0 5980.0 4461.7 3.90 5984.7 22.7 6027.3 4477.6 4.44 ,6032.0 22.7 6074.8 4493.0 2.21 6079.5 22.7 6122.3 4508.3 1.93 6127.0 22.7 6170.3 4522.0 6.35 6175.0 22.7 5521.13 N 5564.99 N 5609.11 N 5653.33 N 5698.08 N 2309.53 E 2327.33 E 2344.92 E 2362.27 2379.66 E 8499.4 8549.3 8599.3 8649.2 8699.1 76.12 20.78 4575.2 74.41 20.55 4587.9 75.88 20.45 4600.7 75.30 20.27 4613.1 74.95 20.01 4625.9 6218.7 4534.2 1.07 6223.4 22.7 6267.0 4546.9 3.45 6271.7 22.6 6315.2 4559.7 2.95 6319.9 22.6 6363.6 4572.1 1.21 6368.2 22.6 6411.9 4584.9 .86 6416.4 22.6 5743.31 N 5788.49 N 5833.69 N 5879.03 N 5924.33N 2396.97 E 2414.01 E 2430.91 E 2447.73 E 2464.35 E 8749.0 8799.0 8848.9 8898.8 8948.8 74.61 20.28 4639.0 76.32 19.98 4651.6 75.04 19.65 4663.9 74.83. 19.94 4676.9 75.13 20.57 4689.8 6460.0 4598.0 .86 6464.6 22.6 6508.4 4610.6 3.47 6512.9 22.5 6556.7 4622.9 2.64 6561.2 22.5 6605.0 4635.9 .70 6609.3 22.5 6653.2 4648.8 1.36 6657.5 22.5 5969.57 N 6014.94 N 6060.46 N 6105.82 N 6151.06 N 2480.94 E 2497.57 E 2513.97 E 2530.30 E 2546.99 E 8998.7 9048.6 9098.6 9148.5 9198.4 73.87 20.43 4703.2 74.36 20.27 4716.8 74.73 20.77 4730.1 76.01 20.67 4742.7 75.37 21.09 4755.1 6701.3 4662.2 2.54 6705.6 22.5 6749.3 4675.8 1.03 6753.6 22.5 6797.4 4689.1 1.22 6801.7 22.4 6845.7 4701.7 2.57 6850.0 22.4 6894.1 4714.1 1.52 6898.4 22.4 6196.13 N 6241.15 N 6286.22 N 6331.41 N 6376.61 N 2563.84 E 2580.54 - , 2597.41 _ ' 2614.50 E 2631.75 E 9248.3 9298.3 9348.2 9398.1 9448.1 75.10 21.03 4767.8 74.54 20.68 4780.9 73.33 20.49 4794.7 75.70 20.51 4808.0 75.03 20.29 4820.6 6942.4 4726.8 .55 6946.6 22.4 6990.6 4739.9 1.31 6994.8 22.4 7038.6 4753.7 2.45. 7042.7 22.4 7086.7 4767.0 4.75 7090.8 22.4 7135.0 4779.6 1.41 7139.1 22.4 6421.66 N 6466.69 N 6511.61 N 6556.68 N 6601.96 N 2649.10 E 2666.25 E 2683.12 E 2699.97 E 2716.81 E A Gyrodata Di B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet r e c t i o n a 1 DOGLEG SEVERITY DIST. deg./ feet 100 ft. CLOSURE ......... ~ ......H Q~:R I Z 0 N T A n AZIMUTH C 0'$ R D I N A T E S deg. ~ feet 9498.0 75.92 20.20 4833.2 9547.9 74.39 20.01 4846.0 9597.8 75.99 19.81 4.858.7 9647.8 74.86 19.73 4871.3 9697.7 76.05 19.78 4883.8 7183.3 4792.2 7231.6 4805.0 7279.8 4817.7 7328.2 4830.3 7376.5 4842.8 1.79 7187.4 22.4 6647.30 N 2733.54 E 3.09 7235.6 22.3 6692.62 N 2750.13 E 3.23 7283.9 22.3 6738.01 N 2766.56 ~ 2.27 7332.1 22.3 6783.48 N 2782.91 2.39 7380.4 22.3 6828.96 N 2799.24 E 9747.6 74.95 19.55 4896.3 9797.6 75.75 19.29 4909.0 9847.5 74.09 19.22 4921.'9 9897.4 75.70 19.14 4935.0 9947.3 75.37 19.21 49'47.4 7424.8 4855.3 7473.1 4868.0 7521.3 4880.9 7569.5 4894.0 7617.8 4906.4 2.25 7428.7 22.3 6874.48 N 2815.51 E 1.68 7476.9 22.3 6920.04 N 2831.57 E 3.33 7525.1 22.2 6965.55 N 2847.47 E 3.23 7573.2 22.2 7011.08 N 2863.30 E .67 7621.5 22.2 7056.74 N 2879.18 E 9997.3 75.68 19.04 4959.9 10047.2 75.61 18.84 4972.3 10097.1 74.64 18.69 4985.1 10147.1 74.28 19.09 4998.5 10197.0 75.05 19.11 5011.7 7666.2 4918.9 7714.5 4931.3 7762.8 4944.1 7810.9 4957.5 7859.0 4970.7 .70 7669.8 22.2 7102.42 N 2895.02 E .41 7718.1 22.2 7148.17 N 2910.72 E 1.96 7766.2 22.1 7193.86 N 2926.25 E 1.06 7814.3 22.1 7239.38 N 2941.82 E 1.54 7862.4 22.1 7284.88 N 2957.58 E 10246.9 76.19 19.43 5024.1 10296.9 73.39 19.09 5037.2 10346.8 74.95 18.85 5050.8 10396.7 76.56 18.87 5063.1 10446.6 76.00 19.15 5074.9 7907.3 4983.1 7955.5 4996.2 8003.5 5009.8 8051.9 5022.1 8100.4 5033.9 2.37 7910.7 5.65 7958.8 3.16 8006.7 3.22 8055.1 1.25 8103.5 22.1 7330.53 N 2973.5'4 E 22.1 7376.01 N 2989.43 22.0 7421.43 N 3005.04 ~ 22.0 7467.23 N 3020.69 E 22.0 7513.09 N 3036.49 E 10496.6 75.68 19.33 5087.1 10546.5 77.40 19.53 5098.8 10596.4 77.22 19.27 5109.7 10646.4 75.73 19.13 5121.4 10696.3 76.14 18.90 5133.5 8148.8 5046.1 8197.3 5057.8 8246.0 5068.7 8294.6 5080.4 8343.0 5092.5 .73 8151.9 22.0 7558.80 N 3052.44 E 3.47 8200.4 22.0 7604.59 N 3068.59 E .62 8249.0 22.0 7650.53 N 3084.77 E 3'.00 8297.5 21.9 7696.37 N 3100.74 E .93 8345.9 21.9 7742.16 N 3116.52 E A Gyro da t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet ,, VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 10746.2 72.78 18.9.1 5146.9 10796.1 76.58 19.59 5160.1 10846.1 75.27 19.72 5172.3 10896.0 75.80 19.61 5184.7 10945.9 74.95 19.63 5197.3 8391.1 5105.9 6.73 8393.9 21.9 8439.2 5119.1 7.72 8442.0 21.9 8487.6 5131.3 2.64 8490.4 21.9 8536.0 5143.7 1.08 8538.7 21.9 8584.3 5156.3 1.70 8587.0 21.9 7787.67 N 7833.12 N 7878.73 N 7924.25 N 7969.76 N 3132.10 E 3147.97 E 3164.26 ~ 3180.53 3196.76 E 10995.9 76.26 19.86 5209.7 11045.8 75.59 19.82 5221.9 11095.7 74.54 19.60 5234.8 11145.7 75.07 19.50 5247.8 11195.6 75.52 19.61 5260.5 8632.6 5168.7 2.66 8635.3 21.8 8681.1 5180.9 1.34 8683.7 21.8 8729.3 5193.8 2.15 8731.9 21.8 8777.5 5206.8 1.08 8780.1 21.8 8825.8 5219.5 .93 8828.3 21.8 8015.28 N 8060.83 N 8106.25 N 8151.65 N 8197.16 N 3213.09 E 3229.53 E 3245.80 E 3261.92 E 3278.09 E 11245.5 76.60 19.76 5272.5 11295.4 75.41 19.91 5284.6 11345.4 76.43 19.72 5296.8 11395.3 75.32 19.52 5308.9 11445.2 76.30 19.46 5321.2 8874.2 5231.5 2.18 8876.8 21.8 8922.7 5243.6 2.40 8925.2 21.8 8971.1 5255.8 2.08 8973.6 21.8 9019.5 5267.9 2.26 9022.0 21.8 9067.9 5280.2 1.97 9070.3 21.7 8242.79 N 8288.36 N 8333.92 N 8379.53 N 8425.16 N 3294.41 E 3310.85 E 3327.27 E 3343.53 E 3359.68 E 11495.2 74.69 19.29 5333.7 11545.1 74.91 19.03 5346.8 11595.0 74.81 18.86 5359.8 11644.9 75.50 19.21 5372.6 11694.9 75.69 19.18 5385.0 9116.2 5292.7 3.24 9118.6 21.7 9164.4 5305.8 .67 9166.8 21.7 9212.6 5318.8 .38 9214.9 21.7 9260.8 5331.6 1.54 9263.1 21.7 9309.2 5344.0 .38 9311.4 21.7 8470.76 N 8516.27 N 8561.86 N 8607.48 N 8653.15 N 3375.71 E 3391.52 3407.17 ~ 3422.91 E 3438.81 E 11744.8 76.68 19.10 5397.0 11794.7 75.12 18.99 5409.1 11844.7 74.54 18.70 5422.2 11894.6 75.17 18.78 5435.2 11944.5 74.70 19.44 5448.2 9357.7 5356.0 1.99 9359.9 21.7 9406.1 5368.1 3.13 9408.2 21.6 9454.2 5381.2 1.29 9456.4 21.6 9502.4 5394.2 1.27 9504.5 21.6 9550.6 5407.2 1.59 9552.7 21.6 8698.96 N 8744.73 N 8790.34 N 8835.98 N 8881.53 N 3454.71 E 3470.51 E 3486.08 E 3501.56 E 3517.34 E A Gyroda t a D i re c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA Page 10 MEASURED.I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 11994.5 76.04 19.21 5460.8 12044.4 75.46 19.10 5473.1 12094.3 76.46 18.95 5485.2 12144.2 75.64 18.60 5497.3 12194.2 74.74 18.37 5510.0 9598.9 5419.8 2.72 9600.9 21.6 9647.3 5432.1 1.18 9649.3 21.6 9695.7 5444.2 2.02 9697.7 21.6 9744.2 5456.3 1.78 9746.1 21.6 9792.4 5469.0 1.86 9794.3 21.5 8927.12 N 3533.33 E 8972.83 N 3549.21 E 9018.62 N 3565.00 ~ 9064.50 N 3580.60 9110.28 N 3595.90 E 12244.1, 74.47 18.23 5523.3 12294.0 76.42 18.61 5535.8 12344.0 75.92 18.77 5547.8 12393.9 71.86 19.38 5561.6 12443.8 75.57 19.46 5575.6 9840.5 5482.3 .60 9842.3 21.5 9888.8 5494.8 3.97 9890.6 21.5 9937.3 5506.8 1.05 9939.0 21.5 9985.2 5520.6 8.22 9986.9 21.5 10033.1 5534.6 7.43 10034.8 21.5 9155.99 N 3611.01 E 9201.83 N 3626.29 E 9247.76 N 3641.82 E 9293.08 N 3657.49 E 9338.28 N 3673.42 E 12493.7 75.22 19.61 5588.2 12543.7 76.08 19.47 5600.6 12593.6 76.18 19.28 5612.5 12643.5 75.50 19.22 5624.8 12693.5 74.19 19.40 5637.8 10081.4 5547.2 .76 10083.1 21.5 10129.8 5559.6 1.74 10131.4 21.5 10178.3 5571.5 .42 10179.9 21.4 10226.7 5583.8 1.37 10228.3 21.4 10274.8 5596.8 2.65 10276.4 21.4 9383.81 N 9429.40 N 9475.12 N 9520.83'N 9566.31 N 3689.58 E 3705.76 E 3721.84 E 3737.80 E 3753.74 E 12743.4 75.08 19.39 5651.0 12793.3 76.01 19.78 5663.5 12843.3 75.75 19.43 5675.7 12893.2 76.10 19.28 5687.8 12943.1 76.20 19.40 5699.8 10323.0' 5610.0 1.78 10324.5 21.4 10371.3 5622.5 2.01 10372.9 21.4 10419.7 5634.7 .86 10421.3 21.4 10468.2 5646.8 .76 10469.7 21.4 10516.6 5658.8 .31 10518.1 21.4 9611.72 N 9657.27 N 9702.89 N 9748.58 N 9794.32 N 3769.72 E 3785.93 - 3802.18 _ 3818.23 E 3834.28 E 12993.0 75.63 19.47 5711.9 13043.0 73.85 19.30 5725.1 13092.9 74.67 19.13 5738.6 13142.8 75.17 19.36 5751.6 13192.8 72.94 19.52 5765.3 10565.0 5670.9 1.15 10566.5 21.4 10613.2 5684.1 3.58 10614.6 21.4 10661.3 5697.6 1.67 10662.7 21.4 10709.5 5710.6 1.10 10710.8 21.3 10757.5 5724.3 4.48 10758.8 21.3 9839.99 N 9885.43 N 9930.81 N 9976.32 N 10021.59 N 3850.40 E 3866.38 E 3882.20 E 3898.09 E 3914.07 E A Gyrodata B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 CASING ALASKA MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet 13242.7 77.23 19.79 5778.2 10805.7 13292.6 76.98 19.71 5789.3 10854.4 13342.5 75.58 19.53 5801.2 10902.8 13392.5 7'6.52 19.32 5813.2 10951.3 13442.4 75.75 19.74 5825.2 10999.8 SUBSEA DEPTH feet D i r e c t i o n a 1 S u r v DOGLEG CLOSURE ............. SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. 5737.2 8.61 10807.0 21.3 10067.02 5748.3 .52 10855.7 21.3 10112.82 5760.2 2.83 10904.2 21.3 10158.51 5772.2 1.93 10952.6 21.3 10204.21 5784.2 1.75 11001.1 21.3 10249.89 Page 11 I Z 0 N TAL RD I NAT E S feet N 3930.29 E N 3946.74 E N 3963.03 E N 3979.14 N 3995.35 E 13492.3 76.32 19.79 5837.2 11048 13542.3 74.49 19.67 5849.8 11096 13592.2 74.47 19.54 5863.1 11144 13642.1 75.46 19.40 5876.1 11192 13692.0 73.94 19.43 5889.3 11241 .2 .5 .6 .8 .0 5796.2 1.15 11049.5 21.3 10295.49 5808.8 3.67 11097.8 21.3 10340.97 5822.1 .25 11145.9 21.3 10386.29 5835.1 2.00 11194.1 21.3 10431.75 '5848.3 3.04 11242.2 21.3 10477.17 N 4011.73 E N 4028.04 E N 4044.18 E N 4060.26 E N 4076.26 E 13742.0 73.65 19.54 5903.2 11288 13791.9 73.87 19.80 5917.2 11336 13841.8 74.34 20.34 5930.8 11384 13891.8 74.83 20.36 5944.1 11433 13941.7 75.70 20.35 5956.8 11481 .9 .9 .9 .0 .3 5862.2 .62 11290.1 21.3 10522.37 5876.2 .67 11338.0 21.2 10567.51 5889.8 1.40 11386.1 21.2 10612.62 5903.1 .98 11434.2 21.2 10657.75 5915.8 1.74 11482.5 21.2 10703.02 N 4092.26 E N 4108.39 E N 4124.87 E N 4141.61 E N 4158.41 E 13991.6 76.23 19.94 5968.9 11529 14041.6 76.64 19.63 5980.6 11578 14091.5 76.25 19.84 5992.3 11626 14141.4 75.75 19.77 6004.4 11675 14191.3 76.44 19.04 6016.4 11723 .7 .3 .8 .3 .7 5927.9 1.33 11530.9 21.2 10748.49 5939.6 1.02 11579.4 21.2 10794.16 5951.3 .88 11627.9 21.2 10839.85 5963.4 1.01 11676.4 21.2 10885.43 5975.4 1.98 11724.8 21.2 10931.14 N 4175.09 E N 4191.52 ~ N 4207.91 N 4224.32 E N 4240.42 E 14241.3 75.74 18.79 6028.4 11772.2 14291.2 77.50 18.63 6040.0 11820.7 14341.1 76.26 18.35 6051.3 11869.3 14391.1 74.79 18.20 6063.8 11917.6 14441.0 75.96 18.00 6076.4 11965.9 5987.4 1.48 11773.2 21.2 10976.99 5999.0 3.54 11821.8 21.2 11023.00 6010.3 2.54 11870.3 21.2 11069.11 6022.8 2.96 11918.6 21.2 11115.02 6035.4 2.38 11966.9 21.1 11160.94 N 4256.13 E N 4271.71 E N 4287.14 E N 4302.30 E N 4317.30 E B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366 A Gy r o d a t a D i cASING ALASKA r e c t i o n a 1 Survey Page 12 MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 14490.9 76.00 17.79 6088,5 14540.8 75.40 17.74 6100.8 14590.8 76.41 17.79 6113.0 · 14640.7 75.87 17.71 6.124.9 14690.6 75.98 17.92 6137.1 12014.3 6047.5 12062.6 6059.8 12111.0 6072.0 12159.4 6083.9 12207.8 6096.1 .42 12015.2 21.1 1.21 12063.5 21.1 2.03 12111.9 21.1 1.09 12160.3 21.1 .46 12208.6 21.1 11207.04 N 4332.19 11253.11 N 4346.95 11299.23 N 4361.73 11345.39 N 4376.51 11391.50 N 4391.32 E E 14740.6 75.19 17.71 6149.5 14790.5 74.60 17.53 6162.5 14840.4 76.21 17.66 6175.1 14890.4 75.35 17.68 6187.4 14940.3 76.78 17.48 6199.4 14990.2 75.65 17.35 6211.3 15040.1 76.00 17.56' 6223.5 15090.1 75.13 17.58 6236.0 15140.0 75.62. 17.35 6248.6 12256.1 6108.5 12304.2 6121.5 12352.5 6134.1 12400.8 6146.4 12449.2 6158.4 12497.7 6170.3 12546.0 6182.5 12594.3 6195.0 12642.6 6207.6 1.63 12256.9 21.1 1.23 12305.0 21.1 3.23 12353.2 21.0 1.72 12401.5 21.0 2.89 12449.9 21.0 2.28 12498.3 21.0 · 81 12546.6 21.0 1.74 12594.9 21.0 1.08 12643.1 21.0 11437.54 N 11483.48 N 11529.54 N 11575.66 N 11621.85 N 11668.12 N 11714.30 N 11760.40 N 11806.48 N 4406.12 E 4420.71 E 4435.31 E 4450.00 E 4464.64 E 4479.15 E 4493.67 E 4508.27 E 4522.77 E Final Station Closure' Distance: 12643.12 ft Az: 20.96 deg. A Gyro da t a D i r e c t i o na i Survey for B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" CASING Location: , MILNE POINT, ALASKA Job Number: AK1096C366SS Run Date: 16-0ct-96 17:01~:15 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub'sea Correction from Vertical Reference: 41 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 20.420 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference AGyrodata Di B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" CASING Location: MILNE POINT, ALASKA ! Job Number: AK1096C366SS r e c t SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg.. feet feet deg./ 100 ft. -41.0 0.00 0.00 0.0 0.0 0.00 o n a 1 CLOSURE ~il DIST. AZIMUT~ feet deg. 0.0 0.0 0.00 N 0.00 E (0'- 15140') A GYRO MULTISHOT SURVEY IN 7" CASING MEASURED DEPTHS ARE REFERENCED'TO THE ORIGINAL R.K.B. OF 41 FT. ELEVATION. 100.0 .36 82.09 200.0 .84 120.15 300.0 1.06 97.79 400.0 2.04 77.50 500.0 2.83 81.39 141.0 .2 . 241.0 .2 . 341.0 .2 . 441.0 1.4 1. 541.0 3.6 . 30 65 69 15 88 .5 82.5 1.5 100.6 3.2 106.3 5.9 96.2 10.4 88.7 .06 N .41 E .33 S 1.30 E .82 S 2.77 E .49 S 5.39 E .44 N 9.55 E 600.0 3.90 67.61 700.0 5.68 56.27 800.0 8.14 48.06 900.0 11.14 44.79 1000.0 12.74 44.74 641.0 7.1 1. 741.0 13.5 2. 841.0 23.9 2. 941.0 39.2 3. 1041.0 58.4 1. 48 O0 63 O1 54 16.3 82.9 24.7 75.1 36.7 67.0 53.5 60.2 74.3 55.6 1.98 N 15.10 E 6.10 N 22.32 E 13.69 N 31.70 E 25.47 N 43.89 E 40.49 N 58.76 E 1100.0 14.08 43.61 1200.0 15.55 42.10 1300.0 18.01 38.13 1400.0 20.76 32.72 1500.0 20.85 30.08 1141.0 80.3 1. 1241.0 104.7 1. 1341.0 133.0 2. 1441.0 166.9 3. 1541.0 204.2 . 34 47 66 11 91 97.4 52.7 122.9 50.5 151.5 48.4 218.5 45.9 253.6 43.5 57.58 N 75.36 E 76.95 N 93.31 E 99.95 N 112.63 E 128.64 N 132.91 E 161.09 N 152.65 E 1600.0 21.65 28.93 1700.0 23.44 25.78 1800.0 26.27 22.69 1900.0 30.53 21.20 2000.0 34.58 19.96 1641.0 242.6 . 1741.0 283.9 2. 1841.0 330.1 2. 1941.0 383.2 4. 2041.0 446.6 4. 86 01 93 4O 16 290.3 41.4 329.7 39.5 373.3 37.5 397.2 35.4 476.4 33.4 194.96 N 171.79 E 231.90 N 190.79 E 274.23 N 209.64 E 323.34 N 229.68 E 382.75 N 251.97 E A Gyro da t a D i r e c t i ona I Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366SS CASING ALASKA Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 38.59 19.84 2200.0 41.48 20.49 2300.0 46.05 21.38 2400.0 '50.72 21.63 2500.0 54.91 21.26 2141.0 520.9 2.73 535.6 31.5 2241.0 604.7 2.59 631.2 30.0 2341.0 699.9. 3.89 735.7 28.8 2441.0 812.4 3.24 849.2 27.8 2541.0 945.0 2.26 969.5 26.9 452.60 N 277.23 E 531.28 N 306.08 E 620.15 N 340.20 E 724.85 N 381.51 E 848.31 N 429.86 E 2600.0 59.49 21.11 2700.0 62.48 22.09 2800.0 69.42 21.40 2900.0 69.34 21.37 3000.0 68.50 21.95 2641.0 1100.6 1.71 1138.4 26.1 2741.0 1283.1 2.33 1314.1 25.4 2841.0 1505.0 2.46 1543.2 24.9 2941.0 1769.9 .17 1776.5 24.3 3041.0 2043.5 2.94 2057.9 23.9 993.49 N 485.90 E 1163.36 N 552.62 E 1369.37 N 635.49 E 1616.76 N 730.20 E 1871.34 N 830.48 E 3100.0 68.74 21.88 3200.0 69.94 22.27 3300.0 69.77 21.84 3400.0 70.44 21.33 3500.0 70.22 22.58 3141.0 2297.6 .97 2337.0 23.7 3241.0 2566.5 .35 2571.5 23.6 3341.0 2839.7 1.42 2853.1 23.4 3441.0 3124.7 1.37 3136.1 23.3 3541.0 3404.1 1.49 3418.4 23.1 2106.84 N 926.22 E 2356.20 N 1027.18 E 2609.43 N 1129.95 E 2874.42 N 1235.13 E 3134.17 N 1338.17 E 3600.0 69.87 22.28 3700.0 70.31 22.18 3800.0 68.32 21.50 3900.0 69.65 22.42 4000.0 70.19 22.79 3641.0 3678.9 .95 3700.3 23.1 3741.0 3960.7 .77 3983.1 23.0 3841.0 4231.4 .83 4256.9 22.9 3941.0 4488.0 4.21 4536.3 22.9 4041.0 4753.9 1.65 4770.0 22.9 3388.36 N 1443.06 E 3649.19 N 1550.12 E 3900.82 N 1650.04 E 4139.21 N 1745.25 E 4384.55 N 1848.46 E 4100.0 69.88 22.17 4200.0 69.15 21.92 4300.0 69.50 22.07 4400.0 69.17 22.29 4500.0 72.01 21.42 4141.0 5035.2 2.06 5052.3 22.8 4241.0 5298.4 1.40 5332.3 22.8 4341.0 5562.7 1.37 5612.4 22.7 4441.0 5820.5 .94 5845.1 22.7 4541.0 6096.5 2.08 6127.0 22.7 4644.67 N 4889.05 N 5134.67 N 5373.48 N 5629.34 N 1955.95 E 2053.89 E 2151.72 E 2249.08 E 2352.86 E A Gyroda t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: F-PAD #MPF-66A, 7" Location: , MILNE POINT, Job Number: AK1096C366SS cASING ALASKA Page SUBSEA I N C L AZIMUTH DEPTH feet .deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 4600.0 74.88 20.23 4700.0 75.83 20.68 4800.0 74.98 20.08 4900.0 75.54 19.17 5000.0 73.83 19.02 4641.0 6467.7 1.27 6512.9 22.6 4741.0 6839.1 2.38 6850.0 22.4 4841.0 7212.9 2.58 7235.6 22.3 4941.0 7592.9 1.99 7621.5 22.2 5041.0 7969.0 4.95 8006.7 22.1 5976.72 N 2483.56 E 6325.15 N 2612.14 E 6675.05 N 2743.69 E 7033.21 N 2871.00 E 7388.74 N 2993.81 E 5100.0 74.27 18.91 5200.0 74.79 19..55 5300.0 74.81 19.14 5400.0 74.96 19.07 5500.0 76.20 18.68 5141.0 8369.8 4.17 8393.9 21.9 5241.0 8752.3 1.64 8780.1 21.8 5341.0 9143.1 1.80 9166.8 21.7 5441.0 9523.8 1.41 9552.7 21.6 5541.0 9909.8 2.71 9939.0 21.5 7767.53 N 8127.93 N 8496.17 N 8856.23 N 9221.75 N 3125.20 E 3253.50 E 3384.54 E 3508.58 E 3633.02 E 5600.0 74.40 19.40 5700.0 74.76 19.17 5800.0 75.77 19.75 5900.0 74.72 20.36 6000.0 77.39 18.60 5641.0 10286.5 2.44 10324.5 21.4 5741.0 10670.1 1.57 10710.8 21.4 5841.0 11062.8 1.91 11097.8 21.3 5941.0 11421.7 1.08 11434.2 21.2 6041.0 11825.1 3.45 11870.3 21.2 9577.26 N 9939.17 N 10309.22 N 10647.16 N 11027.20 N 3757.59 E 3885.12 E 4016.66 E 4137.69 E 4273.12 E 6100.0 75.73 17.85 6200.0 75.33 17.49 6207.6 75.62 17.35 6141.0 12223.0 .83 12256.9 21.1 6241.0 12613.6 1.48 12643.1 21.0 6248.6 12642.6 1.08 12643.1 21.0 11406.03 N 11778.83 N 11806.48 N 4395.99 E 4514.07 E 4522.77 E Final Station Closure: Distance: 12643.12 ft Az: 20.96 deg. gyro/data _4. QUALITY CONTROL SR366.DOC gyro/data QUALITY CONTROL REPORT . JOB NUMBER' AK1096C366 TOOL NUMBER' MAXIMUM GYRO TEMPERATURE' ~ MAXIMUM AMBIENT TEMPERATURE ' 750 82.43 C 39.5 C MAXIMUM INCLINATION' 77.50 AVERAGE AZIMUTH · 20.96 WIRELINE REZERO VALUE ' REZERO ERROR / K' -2 .O4 CALIBRATION USED FOR FIELD SURVEY' 1534 CALIBRATION USED FOR FINAL SURVEY ' 1534 PRE JOB MASS BALANCE OFFSET CHECK ' .46 POST JOB MASS BALANCE OFFSET CHECK~ ' CONDITION OF SHOCK WATCHES .17 USED 0.0 UPON ARRIVAL AT RIG · OK UPON COMPLETION OF SURVEY' OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FI ELD SURVEY 15200 75.62 17.35 6294.5 11824.3 4529.5 FI NAL SURVEY 15140 75.62 17.35 6248.6 11806.48 4522.776 010 SR366.DOC gyro/data SR366.DOC gyro/data FUNCTION TEST JOB NUMBER' AK1096C366 5 Survey stations were 'colleCted at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 6010 70.13 70.13 70.13 70.13 70.13 AZIMUTH M.D. ff I 2 3 4 5 6010 22.34 22.35 22.41 22.31 22.30 SR366.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR366.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK1096C366 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. '/50 GYRO SECTION A0119 DATA S ECTI O N C0002 POWER SECTION C0001 BACKUP TOOL No. 712 GYRO SECTION A0126 DATA SECTION C0025 POWER SECTION C0026 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 A0122 A0074 A0029 A0035 WIRELINE COMPANY: ATLAS WIRELINE CABLE SIZE: 15/32" RUNNING GEAR 2.5" W/3" HEATSHIELD,4.5" CASING ROLLERS TOTAL LENGTH OF TOOL: 33.5 FEET MAXIMUM O.D.: 4.5 INCHES TOTAL WEIGHT OF TOOL: 290 POUNDS SR366.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK1096C366 10/16/96 12:30 14:30 15:15 17:45 17:50 18:10 22:00 TRANS TO LOCATION ARRIVE AT LOCATION MU TOOL TOOL WORKING, STANDBY PU TOOL, MU PUMPIN SUB RIH. 0' STRT.INRUN 15140' STRT OUTRUN 10/17/96 00:00 01:30 04:50 BD. TOOL RD. ATLAS ARRIVE AT ATLAS RTN. TO RIG W / SURVEY. SR366.DOC WELL LOG TRANSt~HTTAL To: State of Alaska April 16, 1997 Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 ~(0" 1MWD Formation Evaluation Logs - MPF-66, MPF-66A & MPF-66 PB 1 AK-MM-60110 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 3 LDWG formatted Discs with verification listing. APl#: 50-029-22697-00, 50-029-22697-01 & 50-029-22697-70 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Stat ........ f Alaska Alas,,~ Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 02-Nov-96 Transmittal of Final Prints. Please sign and return copy to' Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 [Well Name MPF-66 ,~ Services GR/CCL SET SERVICE Bluelines R/F Sepia Film -F~ceiv-ed b~-'-' I Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. State of Alaska Alaska Oil & Gas Conservation Comm. Atten: Howard Okland 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to: Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 19-Oct-96 i:.Well Name Services Bluelines R/F Sepia Film {' iMPF-66 A rGR/CCL 1 1 O i !iMPF-66 A STATIC PRESSURE 1 1 O~ i . ! MPF-66 A GR/CCL PERF 1 1 0 IiMPF-58 GR/CCL SET SRVS 1 1 0 ,MPF-58 GR/CCL PERF 1 1 0 i MPF-58 GR/CCL 1 1 0 ,.MPF-58 GR/CCL PERF 1 1 0 i!MPF-58 PDK/GR/CCL 1 1 0 i!MPF-58 GR/CCL PERF 1 1 0 Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johns,~;~t~ DATE: Chair~ THRU: Blair Wondzell,-,~'~ FILE NO: P. l. Supervisor FROM: Doug Amos,'i~;,~.~j, SUBJECT: Petroleum InspeCtor September 22, 1996 owohiudd.doc Confidential: Yes _, No_X, Attachment Only . Fish Cement Plug BPX MPU MPF-66A PTD 96-0162 Saturday, September 21,,1996: I traveled to BPX MPU MPF-66A well Nabors Rig 22E to witness the tagging of the cement plug set above the 9 5/8" casing shoe. The rig had experienced pipe sticking while drilling the 8 1/2" portion of the hole and lost the BHA. The BHA was cemented and then a second plug set across the 9 5/8" casing shoe. This 15.8 PPG cement plug was tagged with 20,000~ of drillstring weight at 7, 945' (9 5/8" csg. shoe @ 8,223'). The drilling program called for drilling below the shoe and the kicking off to a new bottom hole location, SUMMARY: I witnessed the successful tagging of the kick off cement plug set at 7,945' on BPX MPU MPF-66A well on Nabors Rig No. 22E. Attachment: BPX Morning Drilling Report (9118-9121196) Morning Drilling Report till · _.. III Operator 13 P ~,ploration Field Miln~ Point Depth hmtrmnent Type m) 15~9~,7 MWD - Statkl~rd (declination corrected) ...... Illlll Well MP[L66 Report 3, page 2 RiX Nabots 22[{ Da(e 06:00, 18 Sop 96 A~Jm~lth ~urvey Type (deg) 19,02 Singh~ Shot 16,59 Sit~gh: Shot Coll'l~erlt~ ...: '.. ·. 1(X;92.01MWD - StatManl (declinntic)n corrcctcd) .. . No,i Head' From No. 0 .. Coring · . '1'~ iDiaml Time i Ret 0 ~ 0 [ 0 i 0 ht¢lhmtloJi (de~ g 1.40 ! 81.'37i No Accidenls*No Spills* 11'7 Days Since Last LTA 109 Days Sinu(:. I,~,st !,'['1'272 Days Sincc Last Spilt Fuel Used: 4128 gals, Fuel l(~ceived; 0 gals, Water Received: 350 hi)Is, Currenl Ol~en~lion: (*,irc & wt up, ..... 06;00-06:00 06:00-06:30 06:30 06:30-07:00 (}V t (')0 07: 00,~09: 30 09;30 09:30-11:00 ll:00 i1;0Q-16~0O 16:00 16:00-18;00 18:00 18:00.1@:30 18:30 18:30-18:45 18:45 :[8:45'-00:00 0O:00 00:00-02:00 02:go 02:00-02:3() 02~"JO 02:30--06:00 " Progress Lug BHA run no. 9 Held safety meeting PTSM-Working t£ght hole & workitlg ell mud pump fluid end. completed o~erat ion~ Wo~'kcd ~uck ViDe at 16350.0 fu Continue to work [;~pe down. sstabl~.~hed rotation circ. Pipe came free Circuiat~ a~ 16350.0 f~ Circ$ 2 bpm & work up [o 10.5 bDm wh~ie Obtained clean returns -- 120.00 % hole R~amed to 16764,0 ft Wash & roam. On bottom circulated ab 16764.0 ft Pump Lo/Hi sweeps, Circ aroul%d $ 10,5 bpm to t4 bpm. HOl~ SWe~t w~h uluu - 150,00 ~ hal. Pulled out of hole to 16100,0 ft Got ot~.tck, coming off siipc. Wo~k down ~ free uP, E~ rotation a circ f/ app .t0 min. Packed ~ ~Rck whilst pipe ~cationarM Held safety meetin~ PTSM-Revlew all dr{ [1.~. Con%plet~d opera~ ion~ Held drift (Spill) OS; 1:25 Com~ [et-d oDoration~ Worked stuck pipe at 1.6165,0 ft Work pipe down, b%lt $i. owiy lOGE prairies. Down jars not hi~ing, AttempU ~o jar tip, Jar~ nob hitting. PuLI up Lo 450k~, pipo r~turned ua work{hq down. Froed uo, Circulated at 16165.0 ft Emk~lish rotation & circ. work c{rc up f/ 13 bpm, 0bt~i~lod bottoms up (100% annulu~ volume) Rea~d ua 1616'/.0 ft At~Npt to z'OaA% dO~. S~ar~ed packing off agttitl. Worked ~ree, Ciz'culated at 16167,0 ft Mix & pump LO / til, ~w~ep, Circ& wi: up to 60'8 800' ON 0~'i7]: 96,iF_. d3S 89SIF-6S9-Z06'~]I 3E7. S~O~]UN Operator BP Expluration Field Milne Point Morning Drilling Report WeN MPF-66 Report 31, page 2 Rig Nabors 22I~, Date 06:00, 19 Scp 96 Surveys Depth 0 To In~rument Type Coting Diem Time 0 0 i Azimuth ; Survey Type lnellnathm 0 I 0 ' Comments No Accldcnts~'Nu Spills* 118 Days Since Last LTA 1 t0 Days Since Last U1'I'273 Day,q gince Last SI)ill Fuel Used: 2905 gals. Fucl Received: 10007 gal~, Water Received: 350 bbls, Injected 190 bbls in MP !-'-'10. Ctlctent Operation: Pooh to sc{: where back off occurcd. Progress Log 06:00-.02:00 06:00-06:30 06:30 06;30-08:00 08:00 09:30 09:30-23:00 23:00 23:00-02:00 02:00 02;00- (12:0(~-04:30 04:30 04;30- BHA run no, 9 H~ld aafety meetlng DISCUSSED BACKRF-JiMING. Completed operations P%lmped Dug o~ hole to 15900.0 ft BACERRAM FROM 1~,135-1.$,900. ?ACKED R~-RSTABLI$~ CIR AND ROTATE. Began pre~aution&ry measures Circulated at 15900.0 ft CIR AND INCREASE P[~P DTROKg$ TO 4-1/2 BDM. PACK£D OFF AND GOT STUCK. Got stuck whilst pipe moving Jarred stuck pipe at 15900.0 ft ATTEMPT TO JAR PIP~ DOWN TO FI~ FREE SPOT NO SUCCESS, COULD NOT REGAIN ;uNFf CIR. Began precautionary measures Fished a~ 15900.0 ft PJSM R/U ATLAS AND ATTEMPT TO RUN STRIN~ SHOT DRILLPIPE . COULD NOT GET BELOW 3900' WITHOUT PUMPS. R/D ATLAS. Began precautionary measures Stuck 5in DrillDipe Wurked stuck pipe aR [5906.0 ft '~OOK 21 WRAPS AND 900 AMPS TO BACK OFF PIPE. LOST 20,000~ STRING W~ZIGHT. R/D APR AND ATLAS. Pumped out of hole to 14000.0 ft Pl.~P PET,f, AND POOH_ SOO'OH 8I:t7; 96,1:~ d3S 89cst;,-6qg-/_o6,ai 355 S:a:IOEIUN Optrator BP ExpIornt, intl Icleld Milne Point .., . . II __111 ii Morning Drilling Report _ _. Well M Pl:-66PB2 Rig Nabors 22E ! Illllll I II .._ tlL.[ _ Report 32, paD.,, :3 Date 06:00, 205~p 96 06: O0-1. O; O0 06:00-06:30 0oe:30 06 ::tO-lO: 00 1.0:00 10:00-10:30 10,00-10:30 10:30 t0;30-12~30 %0:30-12:30 12:30-22:30 12:30-16:00 16:00 1,6;00-18:00 18:00 %8:00-18:15 18:15 18:15-2t:30 21:30-22;30 32;30 22:30-23:00 22:30~23:00 23;00 23:00-04:30 23:00-00:30 00:30 00:30-02:00 02:00 02:00-03:30 03;30 03:30-04:30 04:30 t14~3'0-05:00 · 05:00 05t00.- 05:00-06:00 06 Progroso S~uck Sin DriL.[plpe Held ~afegy mootin~ DISCUSSED VISUAG INSPEC'£ION oF DRILL PIPE, CompleL.d operatJ, onc Pulled out of hole go 0.0 Et PIN P~ll. BACKED OFF ~ TIlE gOTTM SECTION OP SL'f. NGJ,;R~, S~E PLACE TH~ ~[U~V.tOUS BACK OFF WAS MADE. At B~ Wellhead work Removed Wear SERVICE WEAR Equipment work completed Planned ~intenance ~erviced ~ron rou,~eck ~JSM. C~IGE OUT ELEVATES z~D ROUGHNECK TO 3-! hND P/U 35 JTE OF :)-1/2:' 15.5~ DRILL PIPE. SW;TCI{ BACK TO 5 ~. Eqliip~nt work completed ~un Drillpipe, 5tn O.D. Ran Drillpipe in stands to ~22~.0 ft At 9-5/8in casing shoe Se~iced Block line PJSM. SLiP ~D CUT DRILl, I,INR, ~]~I~.VICE CEO'S', B~K~¢, AND TOP DRI~. Held safety meeti, nfi D-1 DRILL. 2:00 Completed operations R~ Drillplpo in s~and~ to 15620.0 f~ F~N TIH TO TOF~ NO PROBLEMS. Circulated at 15620.0 ft CIE B/U. NO LOSES. Obtained bottoms up {100% annulus velum.) C.m.nt : Abando~ent pltt9' Mi~ed and Dumped slurry - ~6.00O bbl PJSH. TEST LINES 3000 PSI. PUMP 20 BBLS WATER, BBLS 15.8 PPG CMT, 4 }thbLl WATER ~D 244 BBLS MUD. S~TED BA~CED PLUG. Tail cement Pu&t Dr~%lp%pe, 5tn O,D, Pulled Drillpipo ilz stand~ to 13740,0 f~ R/D CEMENTERS ~D PULL 20 STANDG T0 Circulated at 13740.0 CIE AND COND SUP. NO LOSSES. NO CRI~N'¢ TO SURFACE . Obtained bott~ up (100% annulus volume) Pulled Drillpipe in stands to ~950,0 ft Stopped ; To circulate Circuia~od at 8950,0 it SPOT MI ,VIS PIP ~950-8523. P~[{ TO 8523. Obtained req. fluid proporti.8 100.00 %, hole vol. Cement : Kickoff plug Mixed and pu~od ~lurry - 56.000 MIX ~D PImP 10BBL~] WATER, 56 BBLS CLASS "G' AT lf.5 PPG, 4 BBLB WATER, AND 120 BBbS ~D. SPOT DAB~CED PLUG. Tail cement Pull Drillpipe. 5in O,D. Pulled Drlllpipo in stand8 to ~100.0 ft R/D C~NTE~ ~ID ;'(JI,t, 15 ST~S 1.5-2.0 MINUTES ~ I,',R ;gTAND. Completed 6perations ....... '~0TM 800'oN 9i:'Fi 96, Opcrnter B P Explorntion Fteld Milno Point Morning Drllltng Report Well MPF-66PB2 Rig Nai.~.,rs 22E . IIII I Relaurt 33, p.',gc '2 Date 06:00, 21 Sep96 06:30 06:30-13:00 13:00 1.3:00-15:00 15:00 15~00 16:30 16:30-20:30 20:30 20:30-03:00 20:30-03:00 03:00 03:00- 04:0C 04:00.06:06 Progress Log Pu[.l Dr~ill.plpe, 5~.n O.D. He. ld sat'ety meetinc~ DIS¢:[.;£;S ~:~, ~ P~ AND FALLS, Completed operations Ciz'culated a~ 9100,0 ft CIR B/U Afl'PER PULLING 15 STANDS. PUMP LO/IIX PILL ~ND DISPLACE WELL WI~H b~INl3 M{}~) A~[~ 10 DP3~, CbE~D Obtaln~ req, fluid properties 100 ~ O0 %, hole vol . POOH TO 3-1/2" DRILL PIPE. Sto~ped : To changu handlin~ Laid down 1082.0 ft of DrLLiDiDe PJSM. R/U AN[] f,/D 35 JTS 3-1/2" DRILL PIPE. Comp [eted operations Test well control oquip~txent Tostud BOP ~tack PJ~. R/U AND 'Iq.]ST POPE , SOUG ~OS WAIVED WI~ESSiNG T~SI'. ~NULAR PREVENTER LEAKED, Annxl'l. ar prever~tor failed - Abort Repair Repa{red Annular prcven~oz' PJSM. N/D FLOWLINZ ~D PITCHER NIPPLE. CHANGE OORT RL~RN'i~ iN ~NNULAR ~ RE-TEST S~4E OK. N fPP[,H Fr,OWF,[NE AND /NSTAL5 WEAR RING. Equipment work comt~[eted BHA run no, ~0 R{~Ged UD Drillscri}l~3 handling uqt:ipm~nt ~3WITCH ELEVA't~)R~ TO 5" ~,~D LOAD BHA. Equipment work complot~d Made up BID% no. 10 PJSM. ~E UP BHA . . ... 7_.,O'd 800'OH_qI:tTi 96,'[~,... cl3S S9StT-6S9-Z_O6:[IT.,. 357~ S~O.gldN TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 20, 1996 Tim Schofield, Senior Dflg Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Milne Point Unit MPF-66A BP Exploration (Alaska) Inc. Permit No. 96-162 Sur. Loc 2165'NSL, 2608'WEL, Sec. 6, T13N, R10E, UM Btmhole Loc. 1055'NSL, 2173'WEL, Sec. 20, T14N, R10E, UM Dear Mr. Schofield: Enclosed is the approved apphcation for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. Chairman BY ORDER OF THE COMMISSION dlf/Enclosures Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION Cu~vlMISSION PERMIT TO DRILL 2O AAC 25.005 [] Drill [] Redrill IlL' Type of well [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 42' Milne Point Unit / Kuparuk River 3. Address 6. Property Designation Sands P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355016 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2165' NSL, 2608' WEL, SEC. 6, T13N, R10E Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 783' NSL, 2276' WEL, SEC. 20, T14N, R10E MPF-66A At total depth 9. Approximate spud date Amount $200,000.00 1055' NSL, 2173' WEL, SEC. 20, T14N, R10E 09/20/96 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 355017, 1055'I No Close Approach 2560 18699' MD / 7712' TVD 16. To be completed for deviated wells i17. Anticipated pressure (see 20 AAC 25.035 (e)(2)} Kick Off Depth 8223' Maximum Hole Angle 75.74° Maximum surface 2977 psig, At total depth (TVD) 7458' / 3723 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 Btrc 18669 30' 30' 18699' 7712' 227 sx Class 'G' i19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) " true vertical feet ORIGINAL Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural  Conductor Surface Intermediate RFCEIVED Production ,~ Liner ,~ I.~ ? 2 0 ~.,q 9 ~ /"lj Alaska. 0il & G~s Cons. Commission Perforation depth: measured ¢'~:~ .... true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: James Robertson, 564-5159 Prepared By Name/Number: Kathy Campoamor, 564-5122 21. I hereby certify that the foregoing is true and ,'orrect to the best of my knowledge Signed ,,...?~ ..... ~,~~~J /2_O/~ Tim Schofield / ~ Title Senior Drilling Engineer Date ~ Commission Use Only· Permit Number I APl Number I ^~°w' ~ I ~ c°vor'o~o~ ¢4~'-,,,/.-----~.2.. 50-4:~.~--~-- .~___..,~.~'~/,~,C:~ [ ~/7...~,,~/~.- for other requirements Conditions of Approval:Samples Required [] Yes '~ No Mud Log Required [] Yes ~ No H d If M ' y rogen Su ide easures /~'Yes [] No Directional Survey Required ~-Yes [] No Required Working Pressurefor'BOPE [] 2M; []3M; r~ 5M; [] 10M; [] 15M Other: ,~: '.,:,i~i! btl~F~(~ ~y by order of Approved By i')avid w, ,Johnston Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate Shared Services Drilling I Well Contact: James E. Robertson Name: IMP F-66A I Well Plan Summary 564-5159 JType of Well (producer or injector)' IKUPARUK PRODUCER JSurface Location' Target Location' Bottom Hole Location' 2165 NSL 2608 WEL Sec 06 T13N R10E UM., AK 783 NSL 2276 WEL Sec 20 T14N R10E UM., AK 1055 NSL 2173 WEL Sec 20 T14N R10E UM., AK I AFE Number: 1337025 IEstimated Start 20SEP96 Date' I Rig: I Nabors 22-E IOperating days to 115 complete: MD: Well Design: IMilne Point Ultra Slimhole Longstring 9-5/8", 40# Surface 7", 26# Longstring Formation Markers: Formation Tops MD TVD (bkb) base permafrost 1,8 41 1,79 2 NA 6,732 3,982 Top of Schrader Bluff Sands (8.3 ppg) SeabeeShale 8,059 4,442 Base of Schrader Bluff Sands (8.3 ppg) HRZ 1 7,71 8 7,026 High Resistivity Zone Top Kuparuk 1 8,0 40 7,246 Kuparuk Cap Rock Target Sand -Target 1 8,2 89 7,462 Target Sand (9.6 ppg) Total Depth 1 8,6 99 7,71 2 Casing/Tubing Prollram: Hole (~sg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 8- 1/2" 7" 2 6 # L-80 btrc 18669 30/30 18699/771 2 Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at +7458' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3723 psi is 2977 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: Open Hole Logs: Surface MWD Directional sudace to TD. Intermediate N/A Final Cased Hole Logs: MWD Directional and LWD (GR/RES). N/A Mudloggers are NOT required for this well. Mud Program: I Special design I None-SPUD MUD considerations Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 50 15 8 10 9 8 to to to to to" to to 9.0 1 50 35 1 5 30 1 0 1 5 Intermediate Mud Properties: N/A I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel ~lel Loss Production Mud Properties: I LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel ~lel Loss 9.0 40 1 0 3 7 8.5 6 - 8 to to to to to to to 10.0 50 1 5 1 0 20 9.5 4-6 I Well Control: " Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: IKOP: 18223' IMaximum Hole Angle: Close Approach Well- 175'74° Disposal: Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request. 1. The base of the Permafrost for all wells located in the Milne Point Unit is _+1,800' TVD. Aquifers in the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project area. 2. There are _+26 wells on Milne Pt. 'F' Pad. There may be additional unidentified wells within one quarter mile distance from the subject well. There are no domestic or industrial water use wells located within one mile of the project area. 3. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES". 4. The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. MP F-66A Proposed Summary of Operations .. 9-5/8", 40#, L-80, BTC casing is set at 8,223' md/4,505' TVD. Verbal approval was obtained from B. Wondzell with AOGCC to abandon the MP F-66 wellbore and spot a SIDETRACK kickoff plug as outlined below. The verbal approval was given on 19,MA'Y96 at _+2000 hrs in a phone conversation with J. E. Robertson of BPXA Shared Services Drilling. 5,¢'P , , . . o . , . RIH with backoff shot as deep as possible above stuck point and backoff pipe. If unable to get backoff tool down to adequate depth perform blind backoff. POOH. PU muleshoe and 1000' of 3-1/2" drillpipe. RIH on 5" drillpipe to TOF at _+15,485' md/7,002' TVD. Circulate and condition hole for cement plug. Spot 32 bbl balanced cement plug. Slowly pull out of cement plug. At 15 stands above the plug rig up and circulate slowly down the drillpipe 1 drillpipe volume. MONITOR RETURNS. IF NO LOSSES ARE ENCOUNTERED CONTINUE CBU THE LONG WAY. IF LOSING FLUID SHUTDOWN. NOTE: Volume based on 8-1/2" hole from TOF to 350' above TOF + 30%. PREMIUM G + 0.20% HALAD 344 + 0.20% CFR3 + HR5 AS NECESSARY WT: 15.8 PPG YIELD: 1.15 FT3/SK .. Continue POOH to 8,950' md. Spot 30 bbl high visc mud pill (weight of pill at current mud weight). Continue POOH to 8,523' md. Spot 55 bbl balanced cement plug. Slowly pull out of plug. At 15 stands above the plug rig up and circulate slowly down the drillpipe 1 drillpipe volume. MONITOR RETURNS. IF NO LOSSES ARE ENCOUNTERED DISPLACE WELL TO LSND SYSTEM IF PRACTICAL. IF LOSING FLUID SHUTDOWN. POOH LD muleshoe. NOTE: 9-5/8" shoe is at 8,223' md. Volume based on 300' of 8-1/2" open hole +50% + 200 ft inside 9-5/8", 40# casing. PREMIUM G + 0.2% CFR-3 WT: 16.5 PPG YIELD: 1.05 FT3/SK Test BOPE. MU bit on a motor, with Directional MWD and LWD CDR (GR/RES). RIH to 8,100' md. Begin wash and ream until tag cement. Drill cement to 8,223' md. NOTE: Indicate on morning report "TAG WEIGHT". Circulate and condition mud at 8,223' md before begin"sidetrack. Drill 8.5" hole to TD as per directional plan. Run and Cement 7" Casing. Displace cement with seawater and enough diesel to cover from the base of permafrost to surface. Test casing to 3000 psig. 9. ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well. DRILLING HAZARDS AND RISKS: Seethe updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due to equipment mechanical problems with the surface equipment, rather than formation drilling problems. The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills and completes them. This will make the near rig area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. Close Approach: NONE Lost Circulation: There has not been any appreciable amount of lost circulation in surface hole on any of the F Pad wellls to date. Stuck Pipe Potential: The original MP F-66 wellbore as well as the first sidetrack of the MP F-66 wellbore both experienced stuck pipe incidents whereby bottom hole assemblies were forced to be left in the ground and cemented over. The first incident occured at a bit depth of 15,950' md with a top stabilizer depth of +15,836' md/7,122' TVD(angle @ +70°). The string was stuck while POOH. Eventually the ability to rotate, circulate or reciprocate were all lost. This wellbore was plugged back to +14,675' md. This wellbore was sidetracked and drilled to a depth of 14,674' md. While POOH during a short trip this drillstring was stuck at a bit depth of 16,006' md with a top stabilizer depth of +15,892' md/7,160' TVD (angle @ +68°). Once again the ability to rotate, circulate or reciprocate were all lost and this wellbore is to be plugged with 350' of cement on top of the bha which is left in the wellbore as well as a cement kickoff plug that extends from 300' below the 9 - 5/8" casing shoe at 8,223' md up to 200' inside the 9-5/8" casing. ALTHOUGH THE WELL IS TO BE SIDETRACKED AGAIN AND DESIGNED SUCH THAT 7000' TVD TO 7200' TVD RANGE WILL BE PENETRATED AT ANGLES OF 50° TO 45 ° EXTREME CAUTION SHOULD BE USED IN THIS INTERVAL. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3,725 psi @ 7,458' TVD). There has been no injection in this region, therefore the reservoir pressure should not exceed this estimate. MP F-66A Well 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON STAGE I CEMENT JOB ACROSS THE KUPARUK INTERVAL: CIRC. TEMP: 140° F BHST 170° F at 7040' TVDSS. SPACER: 20 bbls fresh water 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE- Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg APPROX # SACKS: 227 YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 min @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: , . 7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 19 joints of 7" casing (38). This will cover 300' above the KUPARUK 'C' Sand. Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm. Batch mixing is not necessary. CEMENT VOLUME: , Stage 1 cement volume is calculated to cover 1000' md above the Kuparuk 'C' Sand with 30% excess. Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) 349-4511 Fax 344-2160 DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING Well ......... : MPF-66(P19) Field ........ : MILNE POINT,F-PAD Computation..: Minimum Curvature Units. ....... : FEET Surface Lat..: 70.50822297 N' Surface'Long.: 149.65674417 W LOCATIONS - ALASKA ZOne: 4 X-Coord Y-Coord Legal Description Surface ...... : 2164 FSL 2609 FEL S06 T13N R10E UM 541952,89 6035617.47 Tie-in/KOP.~.: 2372 FSL 375 FEL S31 T14N R10E UM 544133.88 6041116..50 TARGET ....... : 783 FSL 2276 FEL S20 T14N R10E UM 547427.00 6050108.00 BHL. ......... : 1055 FSL 2173 FEL S20 T14N R10EUM 547526.68 6050380.44' ANADRILL Prepared ..... : 09/18/96 Vert sect az.: 20.42 KB elevation.: 41.90 ft Magnetic Dcln: +27.909 (E) Scale Factor.: 0.99990200 Convergence..: +0.32358406 AKA-DPC APPROVED SEP 19 1996 'U -' I I O ee ( PROPOSED WELL PROFILE STATION MEAS INCLN DIRECTION VERT-DEPTHS SECT IDENTIFICATION DEPTH ANGLE TIE- IN Kop/ctmv~ 3/lOO ~ 3/ioo L~]R~ 8184 68.25 8223 67.81 8300 70.10 8400 73.08 8490 75.74 COORDINATES-FROM STATE- PLANE TOOL DL/ AZIMITFH TVD SUB-S DIST WE~ X Y FACE 100 21.76 4492 4450 5914 5487.16 N 2.212.23 E 544133.88 6041116.50 149L <TIE 21.48 4506 4465 5951 5521.15 N 2225.70 E 544147.16 6041150.56 7L 1.30 21.16 4534 4492 6023 5588.09 N 2251.82 E 544172.90 6041217.64 7L 3.00 20.77 4566 4524 6117 5676,68 N 2285.76 E 544206.34 6041306.42 7L 3.00 20.42 4590 4548 6204 5757.45 N 2316.11 E 544236.22 6041387.34 3 00 DROP 3/100 16893 75.74 16900 75.54 17000 72.54 17100 ...69..54 17200 66.54 20.42 6659 6618 14349 13390.54 N 5157.95 E 547034.63 6049035.62 LS 0.00 20.42 6661 6619 14355 13396.56 N 5160.19 E 547036.84 6049041.65 LS 3.00 20.42 6689 6647 14451 13486.66 N 5193.74 E 547069.87 6049131.93 LS 3.00 20.42 ~.6721, 667~ ..,145~6_ ~3575.28 ~, 522~.73~.~ 547%02.36 6049220~73 ,LS .... 3~.00 ...... 20.42 6758 6717 14639 13662.19 N 5259.09 E 547134.22 6049307.81 LS 3.00 17300 63.54 20.42 6801 6759 14729 13747.14 N 5290.72 E 547165.37 6049392.93 LS 3.00 (Anadrill (c)96 MPF66P19 3.0b.01 3:51 PM P) MPF-66 (P19) sTATIoN IDENTIFICATION TItRZ END 3/100 DROP MK-19 TKUD' TKUC TKUB TARGET TKA3 TKA2 TKA1 TMLV TD DEPTH . 17400 17500 17600 17700 17718 17800 17810 17900 17918 17941 18040 18222 18235 18289 18289 18314 18342 18399 18699 INCLN ANGLE 6O. 54 57.54 54.54 51.54 51.02 48.54 48.24 45.54 45.00 45.00 45.00 45.00 45.O0 45.00 45.00 4.5.00 45.00 45.00 45.00 DIRECTION AZ IMUTH 20.42 20.42 20.42 20.42 20.42 PROPOSED WELL PROFILE VERT-DEPTHS SECT TVD SUB-S DIST 6848 6806 14818 6899 6857 14903 6955 6913 14986 7015 6973 15066 7026 6984 15080 20.42 7079 7037 20.42 7086 7044 20.42 7147 7105 20.42 7160 7118 20.42 '7176 7134 20.42 7246 7204 20.42 7375 7333 20.42 7384 7342 20.42 7422 7380 20.42 7422 7380 15143 15150 15216 15229 15245 COORDINATES - FROM WELLHEAD 13829.91 N 5321.53 E 13910.27 N 5351.45 E 13988.00 N 5380.39 E 14062.88 N 5408.27 E 14075.74 N 5413.05 E 15315 15444 15453 15491 15491 20.42 7440 7398 15509 20.42 7460 7418 15529 20.42 7500 7458 15569 20.42 7712 7670 15781 14134.70 N 5435.01 E 14141.87 N 5437.68 E .14203.28 N 5460.54 E 14215.35 N 5465.03 E 14230.25 N 5470.58 E 14295.85 N 5495.00 E 14416.75 N 5540.01 E 14425.18 N 5543.15 E 14460.79 N 5556.41 E 14460.79 N 5556.41 E 14477.66 N 5562.69 E 14496.40 N 5569.67 E 14533.89 N 5583.63 E 14732.69 N 5657.64 E 09/18/96 Page 2 STATE-PLANE .X Y 547195.71 6049475~87 547225~17 6049556.38 547253.67 6049634.26 547281.12 6049709.29 547285.,83 6049722.18 TOOL FACE LS LS LS LS LS 547307~45 6049781.26 LS 547310.08 6049788.44 LS 547332.59 6049849.98 .LS 547337.0'2 6049862.07 547342.48 6049877.00 547366.53 6'049942.73 547410.85 6050063.87 547413.94 6050072.32 547427.00 6050108.00 547427.00 6050108.00 547433.18 6050124.90 547440.06 6050143.68 547453.80 6050181.24 547526.68 6050380.44 ANADRILL AKA-DPC APPROVED SEP l ')!996 DL/ 100 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00( 3.00 o.oO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ~0 0~ O J, U O (Anadrill (c)96 MPF66P19 3.0b.01 3:51 PM P) Sep-19-96 -o 03:53P Anadrill DPC 907 344 2160 P.06 SHARED SERVTCES DR];LL T~G Marker IUenti f 1cat ion A) TIE-IN B) KOP/CURVE 3/100 C) END 3/100 CURVE D) ~ 3/!00 E) END 3/I00 DROP F) TARGET ~ G) TD i i u MD N/S E/W B~84 5487~N 2316 8223 5521 2226 8490 5757 16893 13392 N 5258 ~7918 I42~5 N .5465 tB2B9 ~99 $446t N 5555 E ~4733 N 5658 E ANADRILL AKA-DP( APPROVED SEP ). ~; 1996 f4PF-66 (P ~. 9J PLAN V'rEN CLOSURE ..... : ~5782 feet at ~.AzJmuth 2~.0~ DECLINATION.: +27.909 (E) SCALE .......: 1 inch = 2400 feet DRAWN .......: og/ts/g6 Anadpl 1] SchYuml~erger Sep-19-96 03:52P Anadrill DPC 907 344 2160 P.05 Marker IUentificatton A) DRDP 3/100 B) ENO 3/100 DROP C) TARGET D) TO MO BKB SECTN INCLN 16893 6659 14349 75.74 1791B 7160 $5229 45.00 ~828g 7422 15491 45.00 18699 77tE t5781 45.00 MPF-66 (Pig) VERTICAL SECTION VIEW ,i, Section at: 20.42 TVD Scale.' I inch = 200 feet .~00 < 14600 14700 t480.0 14go0 15000 15100 ' 15200 15300 t5400 15500 t5600 $5700 {5,aO0 tSgO0 ~6000 Sect ion De -' (~nm~rill Cc196 l~Pi9 3.0~.0~ 4:02 PN P) SHARED "' ;ERVTCES Marker Identification MD BKB SECTN INCLN _A) TIE-IN 8184 4492 5914 68.25 B) KOP/ClClVE 3/t00 8223 4506 5951 67.8] C) END 3/100 CURVE 8490 ~t590 6204 75.74 D) DROP 3/JO0 16F193 6659 14349 75.74 E) END 3/100 DROP 17918 7t60 15229 45.00 F) TARGET 18289 7422 '15491 45.00 6) I'D 18699 7712 15781 45,00 -DR'ILEIN · i ,4nadrJ]] Schlumberger . MPF-66 (P 19) VERTICAL SECTION Section at: 20.42 TVD Scale.' I inch = 2000 feet Dep Scale · I inch = 2000 feet Drawn .... · 09/~B/96 ............ VIEW . · 0 tO00 2000 3000 4000 5000 6000 7000 BO00 9000 10000 11000 12000 13000 14000 i5000 i6000 17000 Sect ion Departure (Inaori{] {c}96 ~F66PI9 3.~.0! 3:56 PM p} ( adius 2 ~0 feet ) O~ 0 0 Sep-19-96 03:55P Anadrill DPC 907 344 2160 P.09 Client .............. : BP EXPLORATION Well Name ....... : MPF-66(P19) Field ................ : MILNE POINT County ! Stats..: BEECHEY POINT, ALASKA APl# ................ : 50-029-96015-00 Anadrill ID# ...... : 500299601 500P1903 Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Planned Wall Survey Program Start End Type Interval 0 8000 MEWD 200 8000 18699 MEWD 93 Date Calculated ..... : 09'/18/96 16:28 Date Plotted .......... : 09~118/96 16:32 KBE ..................... ;! 41.90 Grid X .................. : ~ 541 952,89 Grid Y .................. : ) 6035617.47 Grid Zone ............. : }ASP ZONE 04 MIN. I FLOWING pLuGGED ENTER ENTER J EXiT EXIT CLOSE OFFSET WELL FLOWING ELLIPSE SURVEY SAFETY SAFE'FY PLUG NO DRILL I NO DRILL' PLUG APPROACH SAFETY SEP. $EP. MD TVD DIST. DIST. ZONE ZONE : ZON~ ZONE STATUS SEP. MD MD MD MD , Page I of 2 MPF-66PB1(D0' ) -566.0 -490.8 7.0 8423 4573 77.1 21.1 0 0 ~ NO DRILL MPF-66PB2(D0~ } -568,0 -490.8 7.0 8423 4573 77.1 21.1 0 0 NO DRILL MPF-74 -131.9 -33.6 936.5 12644 5614 98.2 31.6 9817 10714 13663 13994 NO DRILL MPF-74 -27.7 21.5 181.7 3924 2998 49.2 9.8 2998 I 4266 PLUG MPF-96AA(P021 I 5.5 43.8 72.6 1889 1835 28.3 4.7I FLOW MPF-74(G03) 22.7 63.5 125.8 3081 2672 40.8 7.7i FLOW M PF-70(G01 ) 13.0 25.3 31.4 824 823 12.4 2.1 FLOW MPF-70 14.0 26.4 31.0 ' 822 821 12.3 2.1 ;~,NA£ 'RILL'~ 'A ~,A-DP~ FLOW MPF-78 41.3 61.3 77,1 1339 1324 20.1 3,3 ; FLOW FLOW I ' MPF-TO(G01) 46.6 66.3 77.6 1311 1297 i9.7 3.3 , FLOW MPF-69(G02) i 44.6 61.0 7i.3 1096 1089 16.4 2.7 8EP 'ilo 79~..' FLOW MPF-S9ii 44.7 61.2 69.7 1097 1091 16.5 2.7.~ FLOW MPF-SW4(P01)! 43.5 56.4 63.0 858 856 12.9 2.1 /,-bt,,~I ~_,~,, FLOW MPF-62(G01} ! 23.0 29.3 32.3 420 420 6.3 1.1 ~NI]'IALI'' t., FLOW M PF-96aB(P02) 60,2 76,7 85.0 1097 1090 16.4 2.7 ........... FLOW MPF-62 23.8 30.1 32.3 421 421 9.3 1.1 FLOW MPF-57(PO2) 62.6 76.5 83.4 931 929 14.0 2,3 FLOW MPF-61 74.1 87.1 96.4 868 867 13°0 2.2 ~' FLOW IVlPF-59(P05) 53.4 60.4 63.0 472 472 7~ 1 1.2 FLOW MPF-~W4(P04) $3.S 60.6 63.2 472 '472 7.1 1.2 FI. OW MPF-58(P06) 53;8 60.9 63.4 474 474 7.1 1.2 , ~ FLOW MPF-53 116.8 131.8 143.6 1000 996 15.0 2.5 I FLOW MPF-53(D01 ) 121.2 135.8 142.7 977 973 14.6 2.4 I FLOW MPF-53OH(D01 ~ 120.7 135.0 141.6 953 950 14.3 2.4I FLOW MPF-53OH 120.8 136.1 141.6 953 950 14.3 2,4 I FLOW MPF-54(PO5) 82.5 90.7 93.7 546 546 8.2 1.4I FLOW MPL-25 915.7 1006.0 1831.8 11064 5225 I 90.3 27.7 FLOW MPF-96A(P04) :; 146.2 157.0 161.2 718 718 10.8 1.8 ; · FLOW MPF-96X(P04) j 113.9 120.1 122.3 415 415 6.2 1.0 , FLOW MPF-96B(P04)j 170.1 179.8 182.2 583 583 8.7 I .5 ; FLOW MPF-45(D01) 173.2 182.1 185,4 593 593 8.9 1,5 ' FLOW MPF-45 I 173,9 162.4 185.,5 566 566 8.6 1.4 ' ~ FLOW MPF-45 (G01 ) 174.7 182.8 186.7 543 543 8.2 1.4, FLOW MPF-SW4(P03) 208.8 217.9 221.4 611 611 9,2 1.5 ~ FLOW MPF-96TB(P02) 200.3 208.9 212.1 571 571 8.8 1.4 ~ FLOW MPL-15 1221.7 1276.4 1809.1. 4463 3189 54.6 I I .2 i~' FLOW MPF-37 221.6 230.4 236.3 589 589 8,8 1.5 I FLOW MPF-37(G02) 223.~ 232.3 236.6 589 589 8.8 1.5 FLOW MPF-46(G01) 145,9 151.1 153.6 351 351 5.3 0.9 ' FLOW MPF-46 145.6 150.5 152.3 329 329 4.9 0.8 FLOW MPF-77 133.5 138~0 139.6 299 299 4.5 0.7 FLOW MPF-77(O02) 133.8 138.2 139.8 296 296 4.4 0.7 i ; ~ FLOW MPL-24 1769.6 1830.9 2194.4 6255 3462 ! 61,3 13.1 I FLOW MPF-33(G01) -254.3 262,1 265.9 521 521 ~ 7.8 1.3 ~'~ ~" i';~ ~ ~ , i[:l i"~, FLOW FLOW MPL-14 't 2215.3 2292.8 2906.8 8516 4597 77.6 21.3 FLOW MPF-33 257.2 264.6 266.0 497 497 7.4 1.2 ,~ ~.i~ .~..~ ~ ~ FLOW MPF~38(G01) ~ 204. E~ 210.5 213.3 394 394 5.9 1.0 ~;.~ ~= ': '3 ~" FLOW MPF-22(G01) 319.0 328.1 332.6 605 .605 9.1 1.E FLOW MPF-22 319.8 328.8 332.3 604 604 9.1 1.6 ~: ~" ?'. '* FLOW r~ ~ -~ f'. i'~ ~.~ FLOW MPF-29 281.1 288;9 294.0 620 519 7.8 1.3 ~'~, MPF-29(D01) 282.9 290.4 293.0 495 495 7.4 I .2 ; FLOW MPF-25 309.6 317.3 322.4 514 514 7.7 1.3 . . ~ FLOW MPF-25{G04) 309.8 317.1 320.7 489 489 ~ 7.3 1}~, .~.~ ~ [,,.~ ,~... ;.';, C'. .. ' ............. FLOW MPF-38 208,2 211.O 212.7 319 319 4.8(~- '~';i~-?: :*~': ..... ! FLOW MPF-30 264.1 269.6 273.2 368 368 5.5 0,9 ; FLOW MPF-96TD(P01), 368.2 375.5 378.2 485 i 485 , 7,3 1,2 : " FLOW NOTES: All depths IA dietancea ere in FEET 'AI~ depthe ere referenced fr°m well MPF-68(P19) Men Flowing safety Sap. ia en"~m.~nt of additJonM cJeawlnue from flowing aefety Nne. I I I I East 80th Avenue · Anchorage, Alaska 99518 - Telephone: (907) 349-451 I * FAX: (9(3[)) 344-2160 .Sep-19--96 o .. 03:56P Anadrill DPC 907 344 2160 P.IO Anadrill Alaska District Directional Well Planning Department NORMAL .PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Client .............. : BP EXPLORATION Well Name ....... : MPF-66(P19} Fie;d ................ ; MILNE POINT County/State..: BEECHEY POINT, ALASKA APr# ................ : 50-029-9601 5'00 Anadrill ID# ...... : 500299601 500P1 903 Planned Well Survey Program Start End Type Interval 0 8000 MEVVD 200 8000 18699 MEWD 93 Date Calculated ..... : 0~}/18/96 16:28 Date Plotted .......... : 0~118/96 16:32 KBE ..................... : : 41.90 Grid X .................. : '~ 541 952.89 Gr~ V .................. ; 603561 7.47 Gr~d Zone ............. : ~..ASP ZONE 04 i MIN. FLOWING PLUGGED ENTER ENTER EXIT EXIT CLOSE OFFSET WELL FLOWING ELLIPSE SURVEY SAFETY SAFETY PLUG NO DRILL NO DI~ILL PLUG APPROACH SAFETY SEP. SEP. MD TVD DIST. DIST. ZONE ZONE ZON;; ZONE STATUS SEP. i MD MD MD MD Page 2 of 2 MPL-21 (P07) 3700.2 3781.8 4397.3 9308 4792 81.5 23.3 FLOW MPF-18 352.6 359.2 363.6 443 443 6.6 1.1 FLOW MPL-21 3747.2 3829.9 4463.2 9541 ' 4849 82.7 23.9 FLOW MPF-18(D02) ; 352.8 369.1 361.3 418 416 6.3 1.0 FLOW MPF-96TC(PO 1 )l 426.3 433,5 436.2 483 483 7.2 1,2 FLOW MPF-13 I 399.0 405.6 407.9 439 439 6.6 1,1 , FLOW MPF-10/I 2670.7411.9 418.5 422.9 442 4~2 6.6 1.1 i FLOW MPL-04 j 2713.6 2875.0 3292 2770 42.9 8.2I FLOW MPF-96TA(P01 ~ 465.5 462.4 464.9 459 I 459 5.9 1.1 FLOW MPL-13 j 2434.8 2472.3 2648.3 2752 2493 37.5 6.9 j ,J FLOW MPF-10(DOS) t 414.1 420;0 422.1 395 395 5.9 1.0 } FLOW MPF-14(D01) r 385.1 390.6 392.6 366 366 5.5 0.9 I ( FLOW MPF-14 385.4 390.8 392.8 366 ~ 366 5.5 0.9 FLOW MPL-05 3647.9 3699.9 3913.0 4194 3094 51.9 10.5 FLOW MPF-01 485.6 492.1 496.5 435 435 6.5 1.1 ~' FLOW MPF-21 (DO1) 342.3 346.8 348,4 300 300 4.5' 0.7 FLOW MPF-21 343.5 348.0 348.8 300 300 4.5 0.7 FLOW MPF-06 443,~7 449.2 452.8 366 366 5.5 0.9 ~ FLOW MPF-O6(D01) ~. '~, '~..~9 450.1 451.9 345 345 5.2 0.9 ; FLOW MPL-O8 3369.? 3396.8' 3601.8 2712 2468 37.1 6.8 ,'kNA )RILL A,(A.Dr~L FLOW MPL-29 4309.'5 4347.9 14455'0 2838 2543 ~8.4 7.1/-,^ PPROVi:-:D ,,ow MPL-09 4412.8 4450.2 4535.5 2745 2488 37.4 6.8 , FLOW MPF-02(P02} 476.4 479.6 481.0 224 224 3.4 0.6 ' FLOW MPF-02 I 478.3 481.7 482.9 224, 224 3.4 0.6 ~EJ:::; 'li~ % ~,.~. ' FLOW MPF-02(D01) 478.0 481,3 482.5 224 224 3.4 0.6 I .! FLOW MPL-11 4773.7 4804.7 4870.3 2108 2025 31.1 5.3 -- I . FLOW MPL-16 i 4432.5 4460.5 4662.0 1868 1816 28.0 4.7 !NJ rJ/J~['/)~/L "~')LL~ FLOW MPL-16(D01) 4548.0 457'2.2 4606.3 1611 1580 24.2 4.0 ·~" ~ FLOW MPL-07 5025.2 6048-.9 5078.8 1576 i 1548 23.6 3.9 .~ FLOW M PL-06 5162.3 5178.5 5190.2 1084 1078 10.3 2.7 FLOW MPL-10 5045.9 5059.7 . 5067.7 918 915 13.8 2.3 ! FLOW · ) " i I .. I , NOTES; All depthe & clllt~n~ea ~re In FEET All depth, ~a referermed from well MPF-66(P19) MIn Flowing S~fety Sap. ia amount of ~ldltion,4 cleerence from flowing ~fety , , . East BOth Avenue - Anchorage. Alaska 99518 - TelePhone: (907) 349-4511 - FAX: (907) 344-21 60 . Sep-19-96 O3:54P Anad~ill Client .............. : BP EXPLORATION Well Name ....... : MPF-66(P19) Field ................ : MILNE POINT County/State..: BEECHEY POINT, ALASKA APl# ................ : 50-029-96015-00 Anadrill ID// ...... : 500299601500P1903 ' 11 220( DPC 907 344 2160 P. 08 Alaska District Directional Well Planning Department NORMAL PLANE TRAVELLING CYLINDER RESULTS INCLUDING ELLIPSES OF UNCERTAINTY Planned Well Survey Program Start End Type Interval 0 B000 MEWD 200 8000 18699 MEWD 93 Date Calculated ..... : 0£118196 16:28 Date Plotted .......... -' 09118196 16:29 KBE ..................... : ! 41.90 Grid X .................. : 541952.89 Grid Y .................. : 6035617.47 Grid Zone ............. : · ASP ZONE 04 MPF-74 121 1 rD 18698.82 -50 -2S 0 25 50 75 100 126 160 175 200 225 250 NORMAL PLANE SEPARATION (1' = 50 fl:) 1111 East 60th Avenue · Anchorage, Alaska 99518 - Telephone: {907) 349-451 I * FAX: {907) 344-2160 · WELL PERMIT CHECKLIST COMPANY FIELD & POOL ~ ~ ~'/~ INIT CLASS ADMiNiSTRATiON ............ 1. Permit fee at~.ched ...................... N 2. Lease number appropriate .................. N 3. Unique well name and number ................ N 4. Well located in a defined pool ................. N 5. Well located proper distance from ddg unit boundary. N 7. Sufficient acreage available in ddlling unit... N 8. If deviated, is wellbore plat included ............. N 9. Operator only affected party .................. N 10. Operator has appropriate bond in force ............ N 11. Permit can be issued without conservation order ...... N ~----~A"P"~ ,~DA~E ~_~ 12. Permit can be issued without administra~e approvaJ .... N 13. Can permit be approved before 15-day wail ........ N ENGINEERING APPR DATE 14. Conductor string provided ................... ~' N\ 15. Surface casing protects ail known USDWs .......... YI~[~ ~"5~ ~ 16. CMl' vol adequate to circulate on conductor & surf cscj .... Y 17. CMT vol adequate to tie-in long string to surf csg ....... ~Y N 18. (:3MT will cover ail known productive horizons ......... (~ N 19. Casing designs adequate for C, T, B & permafrost ...... (.72 N 20. Adequate tankage or reserve pit. ............... ~ 21. If a re-drill, has a 10-403 for abndnmnt been approved .... ~ . ¢,.~¢v.e_ 22. Adequate wellbore separation proposed ............ qY-~N 23. If diverter required, is it adequate ................ ~ 24. Ddlling fluid program schematic & equip list adequate .... (~ N 25. BOPEs adequate ........................ (~ N 26. BOPE press rating adequate; test to ,,~'&O 0 psig. (~ N 27. Choke manifold complies w/AP! RP-53 (May 84) ...... (~N 28. Work will occur wi~out operalJon shutdown .......... ,~' N 29. Is. presence of H2S gas probable N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N 31. Data presented on poten~al overpressum zones ....... Y 32. Seismic anaiysis of shaJlow gas zones ............. /Y/N 33. Seabed condition survey (if off-shore) ........... ,//. Y N 34. Contact name/phone for weeidv proqress reports .... Z'... Y N [~p~oratory on~y] REMARKS GEOLOGY: ENGINEERING: COMMISSION: R P,¢~/~ BEW~'.~ ;~f~:) DWJ~ JDH ~ JDN TAB Comments/Instructions: Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Mon Aug 17 04:04:02 1998 Reel Header Service name ............. LISTPE Date ..................... 98/08/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Services Library. Scientific Technical Tape Header Service name ............. LISTPE Date ..................... 98/08/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services WELL 'NAME: 9°%0 - R) API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT Scientific Technical MWD RUN 7 AK-MM-60110 A. PIEPER J. PYRON FROM MSL 0) AUG 1 9 1998 Alaska 0]1 & Gas Cons. Commission Anchorage 2165 2608 6 13N 10E RECEIVED 500292269701 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 17-AUG- 98 KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: .00 41.50 12.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 20.000 110.0 12.250 9.625 8223.0 8.500 18823.0 1. THIS LDWG DATA IS DEPTH SHIFTED (REDO) AS PER THE REQUEST OF KATIE NITZBERG OF BPX ON 08/06/98. 2. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 3. WELL MPF-66A IS REPRESENTED BY RUNS 1, 2, AND 7. 4. RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND DATA IS NOT PRESENTED. 5. DATA FROM RUNS 3, 4, 5, AND 6 IS RELAVENT TO WELLS MPF-66PB1, AND MPF-66, ONLY, SO IT IS NOT PRESENTED HERE. 6. RUN 7 IS DIRECTIONAL WITH GAMMA RAY (SGRC) AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). 7. MPF-66A KICKED OFF FROM MPF-66, AT 8183'MD (4491'TVD) WHEN MPF-66 HAD TO BE PLUGGED BACK AND SIDETRACKED BECAUSE THE BHA WAS LOST IN THE HOLE ON RUN 6. 8. MPF-66A IS DRILLED TO TOTAL DEPTH (TD) @ 18823'MD, 7791'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY SENSOR). $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/08/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE RPD RPM RPS RPX GR FET ROP $ START DEPTH STOP DEPTH 8193.0 18805.5 8193.0 18805.5 8193.0 18805.5 8193.0 18805.5 8202.5 18813.0 8275.0 18805.5 8277.0 18889.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 8193.0 8219.0 8261.0 8336.0 8374.5 8740.0 8766.5 8878.0 9504.5 10188.0 10606.5 11898.0 13741.5 15169.0 16427.0 17013.5 17052.0 17131.0 17689.0 17719.5 18082.5 18086.5 18094 0 18201 5 18226 0 18379 0 18445 0 18467 0 18485 5 18490 0 18497 0 18502 5 185O5 0 18509 5 GR 8141 0 8167 0 8209 0 8281 0 8322 5 8681 5 8700 5 8814 5 9442 0 10133 5 10550 5 11838 0 13678 0 15103.0 16360.0 16945.0 16986.0 17065.0 17623.0 17653 0 18015 0 18017 0 18025 5 18136 0 18159 5 18311 0 18376 0 18398 0 18417 5 18421 5 18428.0 18433.0 18435.0 18440.5 EQUIVALENT UNSHIFTED DEPTH 18515.0 18445.5 18526.5 18456.0 18543.0 18476.5 18889.0 18822.5 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 7 $ REMARKS: MERGED MAIN PASS. $ MERGE TOP 8224.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 18823.0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD AAPI 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max DEPT 8193 18889 ROP 5.9673 2980.01 GR 33.0532 157.829 R?X 0.4845 2000 RPS 0.6928 80.1419 RPM 0.7307 2000 RPD 0.3636 2000 FET 0.3241 19.5347 Mean Nsam 13541 21393 165.87 21225 88.4834 21222 3.4119 21226 3.49555 21226 3.86943 21226 7.23378 21226 1.34038 21062 First Reading 8193 8277 8202.5 8193 8193 8193 8193 8275 Last Reading 18889 18889 18813 18805.5 18805.5 18805.5 18805.5 18805.5 First Reading For Entire File .......... 8193 Last Reading For Entire File ........... 18889 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/08/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/08/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH RPD RPM RPS RPX GR FET ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE 8141 0 8141 0 8141 0 8141 0 8150 5 8222 5 8224 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY STOP DEPTH 18739.0 18739.0 18739.0 18739.0 18746.5 18739.0 18822.5 28-SEP-96 ISC 4.54 MWD 5.46 MEMORY 18823.0 8224.0 18823.0 44.9 77.1 TOOL NUMBER P0585CRGPM6 EWR4 $ ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 P0585CRGPM6 8.500 8.5 BARA DRL N FLD 10.00 52.0 9.4 800 3.0 1.700 .676 1.700 2.800 71.7 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 AAPI 4 1 68 4 2 RPX MWD 7 OHM~ 4 1 68 8 3 RPS MWD 7 OHM~ 4 1 68 12 4 RPM MWD 7 OHMM 4 1 68 16 5 RPD MWD 7 OHMM 4 1 68 20 6 FET MWD 7 HOUR 4 1 68 24 7 ROP MWD 7 FT/H 4 1 68 28 8 First Last Name DEPT GR RPX RPS RPM RPD FET ROP Min 8141 33 0532 0 4845 0 6928 0 7307 0 3636 0 3241 5 9673 Max 18822.5 157. 829 2000 80.4814 2000 2000 19.5347 2980.01 Mean Nsam 13481.8 21364 88.4757 21193 3.42011 21197 3.50326 21197 3.87722 21197 7.24536 21197 1.34587 21034 165.848 21197 Reading 8141 8150.5 8141 8141 8141 8141 8222.5 8224.5 Reading 18822.5 18746.5 18739 18739 18739 18739 18739 18822.5 First Reading For Entire File .......... 8141 Last Reading For Entire File ........... 18822.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/08/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/08/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Connnents ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/08/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File