Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout196-162Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 6/27/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20240627
Well API #PTD #Log Date Log
Company Log Type AOGCC Eset#
KBU 43-07Y 50133206250000 214019 6/6/2024 AK E-LINE Perf
KBU 43-07Y 50133206250000 214019 6/10/2024 AK E-LINE Perf
KBU 43-07Y 50133206250000 214019 6/12/2024 AK E-LINE Perf
MPU F-6650029226970ϭ00 1961ϲϮ 5/17/2024 AK E-LINE Perf
MRU K-03RD2 50733200740200 217029 5/25/2024 AK E-LINE TubingPunch
PAXTON 2 50133205730000 207164 5/16/2024 AK E-LINE Pref
PAXTON 2 50133205730000 207164 5/30/2024 AK E-LINE TubingPatch
PAXTON 11 50133207040000 221114 5/20/2024 AK E-LINE Perf
SCU 13-09 50133203430000 181098 6/2/2024 AK E-LINE Cement/JetCut
SDI 3-07A 50029219110100 198147 5/28/2024 AK E-LINE Pkr/Poglm
SRU 14B-27 50133206040000 212089 6/15/2024 AK E-LINE JewelryLog
SRU 32C-15 50133206130000 213070 6/13/2024 AK E-LINE TubingCut
Revision Explanation: There are additional images added to the final report and a few new .las
files. In the Emeraude folder there are 2 new .las files and in the Field Data folder the RIH and
POOH are new .las files
Please include current contact information if different from above.
T39076
T39076
T39076
T39077
T39078
T39079
T39079
T39080
T39081
T39082
T39083
T39084
MPU F-6650029226970ϭ00 1961ϲϮ 5/17/2024 AK E-LINE Perf
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.06.27 13:09:17 -08'00'
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: ESP Swap
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 18,823 feet N/A feet
true vertical 7,793 feet N/A feet
Effective Depth measured 18,718 feet N/A feet
true vertical 7,719 feet N/A feet
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth)2-7/8" 6.5# / L-80 / EUE 8rd 18,080' 7,301'
Packers and SSSV (type, measured and true vertical depth)N/A N/A N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title: Wells Manager Contact Phone:
N/A
Ryan Lewis
ryan.lewis@hilcorp.com
303-906-5178
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
324-226 & 324-280
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
42014
0 1450
349
0
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
174
Gas-Mcf
MD
112'
140
Size
112'
4,506'
100
ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018
MILNE POINT / KUPARUK RIVER OIL
MILNE PT UNIT F-66A
Plugs
Junk measured
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
196-162
50-029-22697-01-00
3800 Centerpoint Dr, Suite 1400
Anchorage, AK 99503
3. Address:
Hilcorp Alaska LLC
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
Casing
Conductor
18,799'
8,223'Surface
Production
20"
9-5/8"
7"
112'
8,223'
Length
5,750psi
7,240psi18,799' 7,776'
Burst
N/A
Collapse
N/A
3,090psi
5,410psi
measured
TVD
N/A
measured
true vertical
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Grace Christianson at 11:58 am, Jun 13, 2024
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2024.06.13 11:44:32 -
08'00'
Taylor Wellman
(2143)
RBDMS JSB 061924
WCB 8-30-2024 DSR-6/13/24
_____________________________________________________________________________________
Revised By TDF 6/11/2024
SCHEMATIC
Milne Point Unit
Well: MPU F-66A
Last Completed: 5/22/2024
PTD: 196-162
TD =18,823’ (MD) / TD = 7,793’(TVD)
20”
Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E)
DF to Csg Tbg. Spool = 28.50’ (N 22E)
7”
3
12 & 13
14
9
9-5/8”
1
TOC Estimate:
13,579’ -14,784’ MD
PBTD =18,718’ (MD) / PBTD = 7,719’(TVD)
4
15
2
KUP A Sands
5, 6, 7 & 8
9, 10 & 11
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553
9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758
7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5 / L-80 / EUE 2.441 Surface 18,080’ 0.00579
JEWELRY DETAIL
No Depth Item
1 198’STA# 2: 2-7/8" x 1" GLM, 1/4" DPSOV
2 17,823’STA# 1:2-7/8" x 1" GLM DGLV
3 17,911’ XN-nipple 2.313" / 2.205" No-Go
4 17,965’ Discharge Head w/ Ported Sub: HEAD S/A B/O 400PX
5 17,966’ Pump 4: PMP 400PMSSD 126 FLEX7 ER
6 17,988’ Pump 3: PMP 400PMSSD 126 FLEX7 ER
7 18,010’ Pump 2: PMP 400PMSSD 126 FLEX7 ER
8 18,032’ Pump 1: PMP 400PMSXD 024 GINPSHL HS
9 18,041.6’ KIT ADPTR FPX/GINT MNL FSTNR: (400 PMP x 513 Intake)
10 18,042’ Gas Separator: 538GM2T HV E V X MT HS FER
11 18,047’ INTAKE/ INTAKE GPXARCINT FER H6
12 18,048’ Upper Tandem Seal: GS3 B/B/L SB H6 PFSA HL FER 12CRC
13 18,055’ Lower Tandem Seal: GS3 B/B/L SB H6 PFSA HL FER 12CRC
14 18,062’ Motor: 562XP 150/1505/61/6R 12CRC
15 18,075’ Gauge w/ Centralizer:Bottom @ 18,080’
PERFORATION DETAIL
Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
Kup. A Sands
18,370’ 18,422’ 7,497 7,533 52 5/18/2024 Open
18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open
18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open
18,545’ 18,580’ 7,598’ 7,642’ 35 5/17/2024 Open
Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4”
OPEN HOLE / CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24” Hole
9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole
7” 250 sx Class ‘G’ in a 8-1/2” Hole
WELL INCLINATION DETAIL
KOP @ 500’
Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’
Hole Angle through perf interval = 47°
TREE & WELLHEAD
Tree 2-9/16” 5M CIW
Wellhead 11” x 7” FMC Gen 5A 5M Double
Actuated Gen 5 Wellhead
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E - 10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation – 12/21/2019
ESP Swap & Perf Add by ASR#1 – 5/22/2024
STIMULATION SUMMARY
10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe.
Well Name Rig API Number Well Permit Number Start Date End Date
MP F-66A ASR#1 50-029-22697-01-00 196-162 5/13/2024 5/22/2024
Continue testing BOPE (witness waived). Remove and replace: Mud Seals on Blind Rams, HCR x2, K5 Valve. Pull CTS/BPV,
install landing joint, BOLDS.
No operations to report.
5/11/2024 - Saturday
MIRU Pits. . Lift Tree from Wellhead, install BOPE and secure. Lift Cellar, Rig Floor, Spacer Spools, and adapter spool. Level Rig
and raise Mast. Lock in top section and tighten Guy lines. Install rack pins, RU TBG handling equipment, position, and RU Pipe
Skate to rig floor. RU pipe sheds and hook up HYD and electrical. Accept rig 5/13/24 21:00hrs. Begin function and test BOPE
250/2500psi as per sundry (witness waived).
5/14/2024 - Tuesday
5/12/2024 - Sunday
No operations to report.
5/13/2024 - Monday
5/10/2024 - Friday
No operations to report.
5/8/2024 - Wednesday
Hilcorp Alaska, LLC
Weekly Operations Summary
No operations to report.
5/9/2024 - Thursday
No operations to report.
Well Name Rig API Number Well Permit Number Start Date End Date
MP F-66A ASR#1 50-029-22697-01-00 196-162 5/13/2024 5/22/2024
5/17/2024 - Friday
Slickline drift w/ 20' x 3.70" Dummy Whipstock T/18,618' SLM. RU & Test E-line PCE T/ 250/2500psi. Correlate on depth w/18'
correction. Perforate 18,545' - 18,580' w/ 3-3/8" 6SPF - 60deg phase.
5/15/2024 - Wednesday
Hilcorp Alaska, LLC
Weekly Operations Summary
Unable to pull completion. Pump 550bbls - 8.4ppg Source w/ NSX lub down IA taking returns through gas buster. 1.5BPM until
catch returns @ 110bbls away. Increase rate to 2.5BPM @ 700psi. 34.4bph losses. Pull hanger 107K breakover, 93K Up. Cut
ESP cable, lay down Hanger. POOH pumping 2x displacement. POOH F/ 18,106' - T/ 8,608'' pumping 2x displacement.
5/16/2024 - Thursday
Cont. POOH w/ 2-7/8" ESP completion F/ 8,608' - T/ ESP while pumping 2x displacement. Lay down pumps and motors -
minimal scale on OD. Both pumps seized, Motor spins freely. Recovered: 294CC Clamps, 8 Pump Clamps, 3 Protectolizers, 2
Flat Guards, 2 SS Bands. 77 additional bad joints - 278jts Total. Install Test Plug. ND Riser, Birdbath, Spool. RU Shooting Flange,
QTS.
Continue RIH F/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion @ 60FPM pumping 2x displacement. PU/MU TBG HNGR.
Begin feed thru.
RIH w/ 52' x 3-3/8" 6 SPF/60 deg. Phase Guns. Log up from 18,525'. Correlate 18'. Park CCL @ 18,356.2' + 13.8' = Top shot @
18,370' - 18,422'. Static weight - 2073#. Arm and fire guns, weight drops to 1966#, PUH. Monitor well. R/D E-line. load spent
guns onto trailer. Clean and clear rig floor. Load pipe shed of ESP equipment. Code 99 Blue called @ 09:10. crews on STBY.
5/18/2024 - Saturday
Continue RIH F/ 1,126' - T/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion @ 60FPM pumping 2x displacement testing ESP
systems every 1000'.
5/21/2024 - Tuesday
5/19/2024 - Sunday
PU/MU & RIH w/ 2-7/8",6.5#,L, EUE R2 ESP completion T/1,126' while pumping 2x displacement.
5/20/2024 - Monday
Top shot @
18,370' - 18,422'.
Continue RIH F/ 1,126' - T/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion
Continue RIH F/ 9,576' w/ 2-7/8", 6.5#,L,EUE R2 ESP Completion
Pull hanger 107K breakover, 93K Up. Cut
ESP cable, lay down Hanger. POOH pumping 2x displacement. POOH
Recovered: 294CC Clamps, 8 Pump Clamps, 3 Protectolizers, 2
Flat Guards, 2 SS Bands. 77 additional bad joints - 278jts Total.
Well Name Rig API Number Well Permit Number Start Date End Date
MP F-66A ASR#1 & WH 50-029-22697-01-00 196-162 5/13/2024 5/22/2024
No operations to report.
No operations to report.
5/25/2024 - Saturday
No operations to report.
5/28/2024 - Tuesday
5/26/2024 - Sunday
No operations to report.
5/27/2024 - Monday
5/24/2024 - Friday
No operations to report.
5/22/2024 - Wednesday
Hilcorp Alaska, LLC
Weekly Operations Summary
Complete TBG HNGR splice. Land hanger. RILDS. L/D all ESpequip. B/D fluid lines. Remove SW from rig.
Rig released at 06:00 ON 05/22/2024. Install BPV from rig floor, ASR moved off well. Nipple down BOPs, Nipple up adapter
and tree. Tested adapter to 500 / 5000 psi for 10 mins, Pull BPV with dry rod, Secure wellhead and tree.
5/23/2024 - Thursday
No operations to report.
Complete TBG HNGR splice. Land hanger. RILDS
Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 5/21/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20240521
Well API #PTD #Log Date Log
Company Log Type AOGCC Eset#
END 3-07A 50029219110100 198147 5/11/2024 HALLIBURTON Coilflag
MPU E-19 50029227460000 197037 3/25/2024 READ CaliperSurvey
MPU F-66A 50029226970100 196162 5/8/2024 READ CaliperSurvey
MPI 1-27 50029216930000 187009 5/7/2024 READ PPROF
MPU L-17 50029225390000 194169 5/8/2024 READ CaliperSurvey
NCI A-12B 50883200320200 223053 5/2/2024 READ MAPP
NCI A-17 50883201880000 223031 5/3/2024 READ MAPP
PBU 11-41 50029237820000 224017 5/11/2024 HALLIBURTON RBT/Coilflag
PBU D-31B 50029226720200 212168 5/12/2024 HALLIBURTON RBT
PBU F-31A 50029216470100 212002 5/8/2024 READ CaliperSurvey
PBU J-19 50029216290000 186135 5/2/2024 HALLIBURTON RBT
PBU L-292 50029237510000 223025 5/6/2024 HALLIBURTON PPROF
Please include current contact information if different from above.
T38831
T38832
T38833
T38834
T38835
T38836
T38837
T38838
T38839
T38840
T38841
T38842
MPU F-66A 50029226970100 196162 5/8/2024 READ CaliperSurvey
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.05.22 09:57:50 -08'00'
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
18,823' N/A
Casing Collapse
Conductor N/A
Surface 3,090psi
Production 5,410psi
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title: Wells Manager
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
N/A and N/A N/A and N/A
Ryan Lewis
ryan.lewis@hilcorp.com
303-906-5178
Perforation Depth MD (ft):
See Schematic See Schematic 2-7/8"
112' 20"
9-5/8"
7"
8,223'
18,799'
MD
N/A
5,750psi
7,240psi
4,506'
7,776'
8,223'
18,799'
Length Size
Proposed Pools:
112' 112'
6.5# / L-80 / EUE 8rd
TVD Burst
18,106'
MILNE POINT
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018
196-162
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22697-01-00
Hilcorp Alaska LLC
C.O. 432E1160
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
5/15/2024
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
MILNE PT UNIT F-66A
KUPARUK RIVER OIL N/A
7,793' 18,718' 7,719' 1,160 N/A
m
n
P
s
t
p
N
66
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 12:24 pm, May 08, 2024
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2024.05.08 07:30:34 -
08'00'
Taylor Wellman
(2143)
* BOPE test to 2500 psi.
* Eline perforating with PCE as described.
Perforate
10-404
MGR13MAY24
13-MAY-2024
SFD
Mel Rixse
Yes
SFD 5/13/2024JLC 5/13/2024
ESP Swap and Perf Add
Well: MPU F-66A
Date: 5/7/2024
Well Name:MPU F-66A API Number:50-029-22697-01
Current Status:SI ESP Pad:F-Pad
Estimated Start Date:5/15/24 Rig:ASR
Reg. Approval Reqd?No Date Reg. Approval Recvd:-
Regulatory Contact:Tom Fouts Permit to Drill Number:196-162
First Call Engineer:Ryan Lewis (303) 906-5178
Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M)
AFE Number:Job Type:FCO
Current Bottom Hole Pressure:1,890 psi @ 7,297 TVD ESP Gauge (4/3/24) |4.99 PPGE
MPSP:1,160 psi (0.1 psi/ft gas gradient)
Max Inclination:77° @ 10,550 MD
Brief Well Summary:
MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture
stimulation treatment was pumped on the A-sand, however, the job screened out early into the pumping. The
well was then completed with an ESP completion without perforating the C-sand. The well has a history of
flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500 MD. The ESP swap
operated December 2019 to April 2023. We performed routine flow and scrapes for paraffin in the tubing.
2023 we performed a FCO with coil tubing and the ESP pumps were locked up.
Objectives:
Pull failed ESP completion, make a scraper run, add Perf, Run new ESP completion.
Notes Regarding Wellbore Condition:
- 7 casing test to 2,100 psi on 12/16/2019 at 14,810 MD.
Pre-Rig Procedure (Non Sundried Work)
Slickline
1. RU slickline, pressure test PCE to 250psi low / 2,500psi high.
2. Drift and tag with sample bailer.
3. Caliper from 18,041 to surface.
4. Pull DPSOV and set dummy valve in upper GLM at 205 MD.
5. RIH tubing punch holes at 18,020 MD
6. RDMO.
Pumping & Well Support
1. Clear and level pad area in front of well. Spot rig mats and containment.
2. RD well house and flowlines. Clear and level area around well.
3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank.
4. Pressure test lines to 3,000 psi.
5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing
to 500 barrel returns tank.
6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR
arrival.
ESP Swap and Perf Add
Well: MPU F-66A
Date: 5/7/2024
7. RD Little Red Services and reverse out skid.
8. Set BPV. ND tree. NU BOPE.
Brief RWO Procedure (Begin Sundried Work)
1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 barrel returns tank.
2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing
and casing.
a. If needed, kill well with produced water prior to setting CTS.
3. Test BOPE to 250 psi low/ 2,500 psi high. Test annular to 250 psi low/ 2,500 psi high (hold each
ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests.
a. Perform test per ASR 1 BOP Test Procedure
b. Notify AOGCC 24 hours in advance of BOP test.
c. Confirm test pressures per the Sundry conditions of approval.
d. Test VBR rams on 2-7/8 test joint.
e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the
returns tank. Kill well with produced water as needed. Pull BPV.
a. If indications show pressure underneath BPV, lubricate out BPV.
5. Call out Centrilift for ESP pull.
6. RU spoolers to handle ESP cable.
7. MU landing joint or spear, BOLDS, PU on the tubing hanger.
a. Tubing hanger is an FMC 7 x 2-7/8 EUE thread. Most likely has 3 LH ACME lift threads.
b. 2019 tubing PU weight on Innovation (Block wt 35k) recorded as 112 kip. Slack off weight
recorded as 68 kip.
c. 2-7/8 L-80 EUE yield is 144 kip.
8. Confirm hanger free, lay down tubing hanger.
9. POOH and lay down the 2-7/8 tubing.
a. Confirm with Engineer what tubing to re-use based on caliper results.
b. Keep ported discharge head and centralizer for future use.
c. Note any sand or scale inside or on the outside of the ESP on the morning report.
d. Recorded Clamp Totals:
i. Canon Clamps: 282
ii. Flat Guard Clamps = 3
iii. Protectolizers: 3
iv. SS Superbands = 3
10. Lay Down ESP.
11. RU slickline, pressure test PCE to 250psi low / 2,500psi high.
12. Drift run to 18,600.
13. POOH. RD SL.
14. If you stack out high make the string mill run in step 15. If the drift run is clean go right in to
perforating step 17.
15. PU 2-7/8 workstring, 7spiral string mill, and junk mill. RIH to 18,630 MD. This will allow us to
rotate if needed.
ESP Swap and Perf Add
Well: MPU F-66A
Date: 5/7/2024
16. POOH while filling hole with 2x displacement.
17. RU Eline, pressure test lube to 250 psi low and 2500 psi high. RU with a grease head on top of a
pump and sub with a 4.5 x 7 Otis crossover to stab onto the spool piece on BOPs.
18. RIH to perforate.
18,370 18,422 MD
18,545 18,580 MD
19. Tie-in with the GR/CCL and send to Geologist & OE for correlation: Graham Emerson,
graham.emerson@hilcorp.com, 907-793-0315 and Ryan Lewis 303-906-5178.
20. Perforate and POOH. Repeat until entire interval is perforated. RDMO Eline.
21. RIH with new 2-7/8 6.5# L-80 ESP completion to +/- 18,106 and obtain string weights.
a. Check electrical continuity every 1000.
b. Note PU and SO weights on tally.
c. Install ESP clamps per Baker, and cross coupling clamps every other joint.
Nom. Size Length Item Lb/ft Material Notes
5.85 2 Centralizer 4 ~18,100
4.5 2 Intake Sensor 30
5.62 34 Motor - 100HP 80
5.2 7 Lower Tandem Seal 38
5.2 7 Upper Tandem Seal 38
5.2 8 Gas Separator 52
5.38 25 GNPSHL 45
5.38 57 Pumps Flex7 45
1 Ported Discharge Head 13 L-80
2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8" 17,730 2-7/8" EUE 8rd Jt 6.5 L-80
2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD
2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80
2-7/8" 10 Space out pup 6.5 L-80
2-7/8" 30 Tubing Hanger with full joint 6.5 L-80
22. Land tubing hanger. Use extra caution to not damage cable.
23. Lay down landing joint.
24. Set BPV.
25. RDMO ASR.
Post-Rig Procedure:
Well Support
1. RD mud boat. RD BOPE house. Move to next well location.
These perforation footages are correct, per Ryan
Lewis, 5/13/2024. SFD
ESP Swap and Perf Add
Well: MPU F-66A
Date: 5/7/2024
2. RU crane. ND BOPE, set CTS plug, and NU tree.
3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS andBPV.
4. RD crane. Move 500 bbl returns tank and rig mats to next well location.
5. RU well house and flowlines.
Attachments:
1. Current Wellbore Schematic
2. Proposed Wellbore Schematic
3. BOPE Schematic
_____________________________________________________________________________________
Revised By TDF 1/7/2020
SCHEMATIC
Milne Point Unit
Well: MPU F-66A
Last Completed: 12/21/2020
PTD: 196-162
TD =18,823 (MD) / TD = 7,793(TVD)
20
Orig. DF Elev.: 41.5/ GL Elev.: 12.4 (N22E)
DF to Csg Tbg. Spool = 28.50 (N 22E)
7
6&7
8
9
9-5/8
1
TOC Estimate:
13,579 -14,784 MD
PBTD =18,718 (MD) / PBTD = 7,719(TVD)
2
9
KUP A Sands
3 & 4
5
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553
9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223 0.0758
7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 18,106 0.00579
JEWELRY DETAIL
No Depth Item
1 205GLM STA# 1: 1" KBMM W/ Screen Orifice
2 18,041.6 Discharge Head: 400 - B/O
3 18,042 Pump 2: 400PMSXD 141 - P6
4 18,058 Pump 1: 400PMSSD 196 - P6
5 18,077 Gas Separator: 538GRS FER N AR
6 18,080 Upper Tandem Seal: GSB3DB H6 SB/AB PF SA
7 18,087 Lower Tandem Seal: GSB3DB H6 SB/AB PF SA
8 18,094 Motor: 562XP 100Hp/ 1,802V/ 34A
9 18,102 XT-150 PheonixSensor w/ Centralizer: Bottom @ 18,106
PERFORATION DETAIL
Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
Kup. A Sands 18,442 18,488 7,527 7,559 46 10/10/1996 Open
18,500 18,545 7,567 7,598 45 10/10/1996 Open
Ref Log: 10/9/96 GR/CCL 22gm. Atlas 3-3/8 Jumbo Jet Charges 6SPF @ 60° Phasing n EHD=0.76 / TTP=6.4
OPEN HOLE / CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24 Hole
9-5/8" 1,675 sx PF E & 700 sx Class G in a 12-1/4 Hole
7 250 sx Class G in a 8-1/2 Hole
WELL INCLINATION DETAIL
KOP @ 500
Max Hole Angle = 75° to 76° f/ 8,400 16,800
Hole Angle through perf interval = 47°
TREE & WELLHEAD
Tree 2-9/16 5M CIW
Wellhead 11 x 7 FMC Gen 5A 5M Double
Actuated Gen 5 Wellhead
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E - 10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation 12/21/2019
STIMULATION SUMMARY
10/23/96 53 M lbs. 16/20 Carbolite behind pipe.
_____________________________________________________________________________________
Revised By TDF 4/8/2020
PROPOSED
Milne Point Unit
Well: MPU F-66A
Last Completed: 12/21/2020
PTD: 196-162
TD =18,823 (MD) / TD = 7,793(TVD)
20
Orig. DF Elev.: 41.5/ GL Elev.: 12.4 (N22E)
DF to Csg Tbg. Spool = 28.50 (N 22E)
7
2
8 & 9
10
9
9-5/8
1
TOC Estimate:
13,579 -14,784 MD
PBTD =18,718 (MD) / PBTD = 7,719(TVD)
3
11
KUP A Sands
4 & 5
6 & 7
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553
9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223 0.0758
7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface ±18,100 0.00579
JEWELRY DETAIL
No Depth Item
1 ±200STA# 1: 2-7/8" x 1" GLM, 1/4" OV
2 ±XX,XXX XN-nipple 2.313" / 2.205" No-Go
3 ±XX,XXX Ported Discharge Head:
4 ±XX,XXX Pump 2:
5 ±XX,XXX Pump 1:
6 ±XX,XXX GNPSHL:
7 ±XX,XXX Gas Separator:
8 ±XX,XXX Upper Tandem Seal:
9 ±XX,XXX Lower Tandem Seal:
10 ±XX,XXX Motor: 100Hp
11 ±XX,XXX Sensor w/ Centralizer: Bottom @ ±18,100
PERFORATION DETAIL
Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
Kup. A Sands
±18,370 ±18,422 ±7,497 ±7,533 ±52 Future Future
18,442 18,488 7,527 7,559 46 10/10/1996 Open
±18,442 ±18,488 ±7,527 ±7,559 ±46 Future Future
18,500 18,545 7,567 7,598 45 10/10/1996 Open
±18,500 ±18,545 ±7,567 ±7,598 ±45 Future Future
Ref Log: 10/9/96 GR/CCL 22gm. Atlas 3-3/8 Jumbo Jet Charges 6SPF @ 60° Phasing n EHD=0.76 / TTP=6.4
OPEN HOLE / CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24 Hole
9-5/8" 1,675 sx PF E & 700 sx Class G in a 12-1/4 Hole
7 250 sx Class G in a 8-1/2 Hole
WELL INCLINATION DETAIL
KOP @ 500
Max Hole Angle = 75° to 76° f/ 8,400 16,800
Hole Angle through perf interval = 47°
TREE & WELLHEAD
Tree 2-9/16 5M CIW
Wellhead 11 x 7 FMC Gen 5A 5M Double
Actuated Gen 5 Wellhead
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E - 10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation 12/21/2019
STIMULATION SUMMARY
10/23/96 53 M lbs. 16/20 Carbolite behind pipe.
These proposed perforation
footages should be 18,545' to
18,580' MD. SFD
Not proposed
SFD
Milne Point
ASR Rig 1 BOPE
2023
11 BOPE
4.48'
4.54'
2.00'
CIW-U
4.30'
Hydril GK
11" - 5000
VBR or Pipe Rams
Blind11'- 5000
DSA, 11 5M X 7 1/16 5M (If Needed)
2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves
HCRManualManualHCR
Stripping Head
2-7/8 x 5 VBR
1
Davies, Stephen F (OGC)
From:Ryan Lewis <ryan.lewis@hilcorp.com>
Sent:Monday, May 13, 2024 10:18 AM
To:Davies, Stephen F (OGC)
Cc:Graham Emerson; Dewhurst, Andrew D (OGC)
Subject:RE: [EXTERNAL] MPU F-66A (Permit 196-162, Sundry 324-280) - Question
I apologize, I dont know how I missed that in the schema c.
Step 18 from the Brief RWO Procedure is correct.
Thanks,
RL
From: Davies, Stephen F (OGC) <steve.davies@alaska.gov>
Sent: Monday, May 13, 2024 9:43 AM
To: Ryan Lewis <ryan.lewis@hilcorp.com>
Cc: Graham Emerson <Graham.emerson@hilcorp.com>; Dewhurst, Andrew D (OGC) <andrew.dewhurst@alaska.gov>
Subject: [EXTERNAL] MPU F-66A (Permit 196-162, Sundry 324-280) - Question
Ryan,
For consistency: In Sundry Applica on 324-280 for MPU F-66A, the perfora on footages shown on the Proposed
Wellbore Schema c drawing do not match those listed in Step 18 of the Brief RWO Procedure. Which are correct?
From the Proposed Wellbore Schema c drawing:
From the Brief RWO Procedure sec on:
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
2
Thanks and Be Well,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any a achments, contains informa on from the Alaska Oil and Gas Conserva on Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain con den al and/or privileged informa on. The unauthorized review, use
or disclosure of such informa on may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without rst saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named
above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this
email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed
above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission,
opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and
the recipient should carry out such virus and other checks as it considers appropriate.
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2.Operator Name: 4.Current Well Class:5.Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
18,823'N/A
Casing Collapse
Conductor N/A
Surface 3,090psi
Production 5,410psi
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14.Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16.Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title: Wells Manager
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
N/A and N/A N/A and N/A
Ryan Lewis
ryan.lewis@hilcorp.com
303-906-5178
Perforation Depth MD (ft):
See Schematic See Schematic 2-7/8"
112' 20"
9-5/8"
7"
8,223'
18,799'
MD
N/A
5,750psi
7,240psi
4,506'
7,776'
8,223'
18,799'
Length Size
Proposed Pools:
112' 112'
6.5# / L-80 / EUE 8rd
TVD Burst
18,106'
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018
196-162
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22697-01-00
Hilcorp Alaska LLC
C.O. 432E1160
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
5/19/2024
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
MILNE PT UNIT F-66A
MILNE POINT KUPARUK RIVER OIL N/A
7,793' 18,718' 7,719' 1,160 N/A
No
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 8:36 am, Apr 19, 2024
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2024.04.19 08:25:38 -
08'00'
Taylor Wellman
(2143)
324-226
10-404
SFD
* BOPE test to 2500 psi.
* Eline perforating with PCE as described.
MGR19APR24 SFD 4/22/2024
Perforate
1,160
DSR-4/23/24*&:
Brett W. Huber,
Sr.
Digitally signed by Brett W.
Huber, Sr.
Date: 2024.04.25 14:29:46
-08'00'04/25/24
RBDMS JSB 042624
ESP Swap and Perf Add
Well: MPU F-66A
Date: 4/3/2024
Well Name:MPU F-66A API Number:50-029-22697-01
Current Status:SI ESP Pad:F-Pad
Estimated Start Date:5/19/24 Rig:ASR
Reg. Approval Req’d?No Date Reg. Approval Rec’vd:-
Regulatory Contact:Tom Fouts Permit to Drill Number:196-162
First Call Engineer:Ryan Lewis (303) 906-5178
Second Call Engineer:Taylor Wellman (907) 777-8449 (O) (907) 947-9533 (M)
AFE Number:Job Type:FCO
Current Bottom Hole Pressure:1,890 psi @ 7,297’ TVD ESP Gauge (4/3/24) |4.99 PPGE
MPSP:1,160 psi (0.1 psi/ft gas gradient)
Max Inclination: 77° @ 10,550’ MD
Brief Well Summary:
MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture
stimulation treatment was pumped on the A-sand, however, the job screened out early into the pumping. The
well was then completed with an ESP completion without perforating the C-sand. The well has a history of
flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500’ MD. The ESP swap
operated December 2019 to April 2023. We performed routine flow and scrapes for paraffin in the tubing.
2023 we performed a FCO with coil tubing and the ESP pumps were locked up.
Objectives:
Pull failed ESP completion, make a scraper run, add Perf, Run new ESP completion.
Notes Regarding Wellbore Condition:
- 7” casing test to 2,100 psi on 12/16/2019 at 14,810’ MD.
Pre-Rig Procedure (Non Sundried Work)
Slickline
1. RU slickline, pressure test PCE to 250psi low / 2,500psi high.
2. Drift and tag with sample bailer.
3. Caliper from 18,041’ to surface.
4. Pull DPSOV and set dummy valve in upper GLM at 205’ MD.
5. RIH tubing punch holes at 18,020’ MD
6. RDMO.
Pumping & Well Support
1. Clear and level pad area in front of well. Spot rig mats and containment.
2. RD well house and flowlines. Clear and level area around well.
3. RU Little Red Services. RU reverse out skid and 500 barrel returns tank.
4. Pressure test lines to 3,000 psi.
5. Circulate at least one wellbore volume with produced water down tubing, taking returns up casing
to 500 barrel returns tank.
6. Confirm well is dead. Contact operations engineer if freeze protection is needed prior to ASR
arrival.
add Perf
ESP Swap and Perf Add
Well: MPU F-66A
Date: 4/3/2024
7. RD Little Red Services and reverse out skid.
8. Set BPV. ND tree. NU BOPE.
Brief RWO Procedure (Begin Sundried Work)
1. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to 500 barrel returns tank.
2. Check for pressure and if 0 psi set CTS plug. If needed, bleed off any residual pressure off tubing
and casing.
a. If needed, kill well with produced water prior to setting CTS.
3. Test BOPE to 250 psi low/ 2,500 psi high. Test annular to 250 psi low/ 2,500 psi high (hold each
ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests.
a. Perform test per ASR 1 BOP Test Procedure
b. Notify AOGCC 24 hours in advance of BOP test.
c. Confirm test pressures per the Sundry conditions of approval.
d. Test VBR rams on 2-7/8” test joint.
e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
4. Bleed any pressure on casing to the returns tank. Pull CTS plug. Bleed any pressure off tubing to the
returns tank. Kill well with produced water as needed. Pull BPV.
a. If indications show pressure underneath BPV, lubricate out BPV.
5. Call out Centrilift for ESP pull.
6. RU spoolers to handle ESP cable.
7. MU landing joint or spear, BOLDS, PU on the tubing hanger.
a. Tubing hanger is an FMC 7” x 2-7/8” EUE thread. Most likely has 3” LH ACME lift threads.
b. 2019 tubing PU weight on Innovation (Block wt 35k) recorded as 112 kip. Slack off weight
recorded as 68 kip.
c. 2-7/8” L-80 EUE yield is 144 kip.
8. Confirm hanger free, lay down tubing hanger.
9. POOH and lay down the 2-7/8” tubing.
a. Confirm with Engineer what tubing to re-use based on caliper results.
b. Keep ported discharge head and centralizer for future use.
c. Note any sand or scale inside or on the outside of the ESP on the morning report.
d. Recorded Clamp Totals:
i. Canon Clamps: 282
ii. Flat Guard Clamps = 3
iii. Protectolizers: 3
iv. SS Superbands = 3
10. Lay Down ESP.
11. PU 2-7/8” workstring, 7” spiral string mill, and junk mill. RIH to 18,630’ MD. This will allow us to
rotate if needed.
12. POOH while filling hole with 2x displacement.
13. RU Eline, pressure test lube to 250 psi low and 2500 psi high. RU with a grease head on top of a
pump and sub with a 4.5” x 7” Otis crossover to stab onto the spool piece on BOPs.
ESP Swap and Perf Add
Well: MPU F-66A
Date: 4/3/2024
14. RIH to perforate.
18,370’ – 18,422’ MD
18,545’ – 18,580’ MD
15. Tie-in with the GR/CCL and send to Geologist & OE for correlation: Graham Emerson,
graham.emerson@hilcorp.com, 907-793-0315 and Ryan Lewis 303-906-5178.
16. Perforate and POOH. Repeat until entire interval is perforated. RDMO Eline.
17. RIH with new 2-7/8” 6.5# L-80 ESP completion to +/- 18,106’ and obtain string weights.
a. Check electrical continuity every 1000’.
b. Note PU and SO weights on tally.
c. Install ESP clamps per Baker, and cross coupling clamps every other joint.
Nom. Size Length Item Lb/ft Material Notes
5.85 2 Centralizer 4 ~18,100’
4.5 2 Intake Sensor 30
5.62 34 Motor - 100HP 80
5.2 7 Lower Tandem Seal 38
5.2 7 Upper Tandem Seal 38
5.2 8 Gas Separator 52
5.38 25 GNPSHL 45
5.38 57 Pumps – Flex7 45
1 Ported Discharge Head 13 L-80
2-7/8" 10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8" 17,730 2-7/8" EUE 8rd Jt 6.5 L-80
2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8"8 2-7/8" x 1" GLM, 1/4" OV 6.5 L-80 ~200 MD
2-7/8"10 2-7/8" EUE 8rd Pup Jt 6.5 L-80
2-7/8" 150 2-7/8" EUE 8rd Jt 6.5 L-80
2-7/8" 10 Space out pup 6.5 L-80
2-7/8" 30 Tubing Hanger with full joint 6.5 L-80
18. Land tubing hanger. Use extra caution to not damage cable.
19. Lay down landing joint.
20. Set BPV.
21. RDMO ASR.
Post-Rig Procedure:
Well Support
1. RD mud boat. RD BOPE house. Move to next well location.
2. RU crane. ND BOPE, set CTS plug, and NU tree.
3. Test tubing hanger void to 500 psi low/5,000 psi high. Pull CTS and BPV.
18,370’ – 18,422’ MD
18,545’ – 18,580’ MD
ESP Swap and Perf Add
Well: MPU F-66A
Date: 4/3/2024
4. RD crane. Move 500 bbl returns tank and rig mats to next well location.
5. RU well house and flowlines.
Attachments:
1. Current Wellbore Schematic
2. Proposed Wellbore Schematic
3. BOPE Schematic
_____________________________________________________________________________________
Revised By TDF 1/7/2020
SCHEMATIC
Milne Point Unit
Well: MPU F-66A
Last Completed: 12/21/2020
PTD: 196-162
TD =18,823’ (MD) / TD = 7,793’(TVD)
20”
Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E)
DF to Csg Tbg. Spool = 28.50’ (N 22E)
7”
6&7
8
9
9-5/8”
1
TOC Estimate:
13,579’ -14,784’ MD
PBTD = 18,718’ (MD) / PBTD = 7,719’(TVD)
2
9
KUP A Sands
3 & 4
5
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553
9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758
7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface 18,106’ 0.00579
JEWELRY DETAIL
No Depth Item
1 205’GLM STA# 1: 1" KBMM W/ Screen Orifice
2 18,041.6 Discharge Head: 400 - B/O
3 18,042’ Pump 2: 400PMSXD 141 - P6
4 18,058’ Pump 1: 400PMSSD 196 - P6
5 18,077’ Gas Separator: 538GRS FER N AR
6 18,080’ Upper Tandem Seal: GSB3DB H6 SB/AB PF SA
7 18,087’ Lower Tandem Seal: GSB3DB H6 SB/AB PF SA
8 18,094’ Motor: 562XP – 100Hp/ 1,802V/ 34A
9 18,102’ XT-150 PheonixSensor w/ Centralizer: Bottom @ 18,106’
PERFORATION DETAIL
Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
Kup. A Sands 18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open
18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open
Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4”
OPEN HOLE / CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24” Hole
9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole
7” 250 sx Class ‘G’ in a 8-1/2” Hole
WELL INCLINATION DETAIL
KOP @ 500’
Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’
Hole Angle through perf interval = 47°
TREE & WELLHEAD
Tree 2-9/16” 5M CIW
Wellhead 11” x 7” FMC Gen 5A 5M Double
Actuated Gen 5 Wellhead
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E - 10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation – 12/21/2019
STIMULATION SUMMARY
10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe.
_____________________________________________________________________________________
Revised By TDF 4/8/2020
PROPOSED
Milne Point Unit
Well: MPU F-66A
Last Completed: 12/21/2020
PTD: 196-162
TD =18,823’ (MD) / TD = 7,793’(TVD)
20”
Orig. DF Elev.: 41.5’/ GL Elev.: 12.4’ (N22E)
DF to Csg Tbg. Spool = 28.50’ (N 22E)
7”
2
8 & 9
10
9
9-5/8”
1
TOC Estimate:
13,579’ -14,784’ MD
PBTD =18,718’ (MD) / PBTD = 7,719’(TVD)
3
11
KUP A Sands
4 & 5
6 & 7
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 91.1 / H-40 / N/A N/A Surface 112' 0.3553
9-5/8" Surface 40 / L-80 / BTRC & BTC 8.835 Surface 8,223’ 0.0758
7" Production 26 / L-80 / BTC MOD 6.276 Surface 18,799’ 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5 / L-80 / EUE 8rd 2.441 Surface ±18,100’ 0.00579
JEWELRY DETAIL
No Depth Item
1 ±200’STA# 1: 2-7/8" x 1" GLM, 1/4" OV
2 ±XX,XXX’ XN-nipple 2.313" / 2.205" No-Go
3 ±XX,XXX’ Ported Discharge Head:
4 ±XX,XXX’ Pump 2:
5 ±XX,XXX’ Pump 1:
6 ±XX,XXX’ GNPSHL:
7 ±XX,XXX’ Gas Separator:
8 ±XX,XXX’ Upper Tandem Seal:
9 ±XX,XXX’ Lower Tandem Seal:
10 ±XX,XXX’ Motor: 100Hp
11 ±XX,XXX’ Sensor w/ Centralizer: Bottom @ ±18,100’
PERFORATION DETAIL
Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
Kup. A Sands
±18,370’ ±18,422’ ±7,497 ±7,533 ±52 Future Future
18,442’ 18,488’ 7,527’ 7,559’ 46 10/10/1996 Open
±18,442’ ±18,488’ ±7,527’ ±7,559’ ±46 Future Future
18,500’ 18,545’ 7,567’ 7,598’ 45 10/10/1996 Open
±18,500’ ±18,545’ ±7,567’ ±7,598’ ±45 Future Future
Ref Log: 10/9/96 GR/CCL – 22gm. Atlas 3-3/8” Jumbo Jet Charges 6SPF @ 60° Phasing n – EHD=0.76” / TTP=6.4”
OPEN HOLE / CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24” Hole
9-5/8" 1,675 sx PF ‘E’ & 700 sx Class ‘G’ in a 12-1/4” Hole
7” 250 sx Class ‘G’ in a 8-1/2” Hole
WELL INCLINATION DETAIL
KOP @ 500’
Max Hole Angle = 75° to 76° f/ 8,400’ – 16,800’
Hole Angle through perf interval = 47°
TREE & WELLHEAD
Tree 2-9/16” 5M CIW
Wellhead 11” x 7” FMC Gen 5A 5M Double
Actuated Gen 5 Wellhead
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E - 10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation – 12/21/2019
STIMULATION SUMMARY
10/23/96 – 53 M lbs. 16/20 Carbolite behind pipe.
Milne Point
ASR Rig 1 BOPE
2023
11” BOPE
4.48'
4.54'
2.00'
CIW-U
4.30'
Hydril GK
11" - 5000
VBR or Pipe Rams
Blind11'’- 5000
DSA, 11 5M X 7 1/16 5M (If Needed)
2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves
HCRManualManualHCR
Stripping Head
2-7/8” x 5” VBR
Samuel Gebert Hilcorp Alaska, LLC
GeoTech Assistant 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
Fax: 907 777-8510
E-mail: sam.gebert@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: Date:
DATE: 09/15/2020
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
MPU F-66A (196-162)
Multi Finger Caliper Log 12/09/2019
ANALYSIS
FIELD DATA
Please include current contact information if different from above.
Received by the AOGCC 09/16/2020
PTD: 1961620
E-Set: 33893
Abby Bell 09/16/2020
P !V
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 7 , 2020
REPORT OF SUNDRY WELL OPERATIONS
��Trr
1. Operations Abandon L1 Plug Perforations Ll Fracture StimulateLJ
Pull Tubing Lzl ra own
Performed: Suspend ❑ Perforate ❑ Other Stimulate❑
Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ arforate New Pool ❑ Repair Well❑
Re-enter Susp Well ❑ Other: ESP Change -out Q
2. Operator
Name: Hilcorp Alaska LLC
4. Well Class Before Work:
5. Permit to Drill Number:
M t `i 0457
Development ✓
P ❑
Stratigraphic❑
Ex lorato
P N ❑
Service ❑
196-162 .��
3. Address: 3800Centerpoint Dr, Suite 1400 Anchorage,
/ „�
6. API Number:AK
99503
50-029-22697-01-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL0025509/ ADL0355016/ ADL0355017/ ADL0355018
MILNE PT UNIT F -66A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
MILNE POINT / KUPARUK RIVER OIL
11. Present Well Condition Summary:
Total Depth measured 18,823 feet Plugs
measured N/A feet
true vertical 7,793 feet Junk
measured N/A feet
Effective Depth measured 18,718 feet Packer
measured N/A feet
true vertical 7,719 feet
true vertical N/A feet
Casing Length Size MD
TVD Burst Collapse
Conductor 112' 20" 112'
112' N/A N/A
Surface 8,223' 9-5/8" 8,223'
4,506' 5,750psi 3,090psi
Production 18,799' 7" 18,799'
7,776' 7,240psi 5,410psi
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.5# / L-80 / EUE 8rd 18,106' 7,299'
Packers and SSSV (type, measured and true vertical depth) N/A
N/A N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf
Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 1 0 0 1
0 400 0
Subsequent to operation: 1213 16 1
35 420 378
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 15. Well Class after work:
Daily Report of Well Operations ❑ Exploratory❑
Development ❑✓ Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16. Well Status after work:
Oil ✓ Gas WDSPL
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ
❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
319-538
Authorized Name: Chad Helgeson ' "'"7Ay"
Contact Name: Ian Toomey-P�
Authorized Title: Operations Manager
Contact Email: itoonneyQhkorD.Conn
Authorized Signature: Date
1/21/2020 Contact Phone: 777-8434
4ev
ZOO(/,�?��OdO JAN 2 3 2020
Form 10-404 Revised 4/2017 Submit Original Only
Milne Point Unit
SCHEMATIC Well: MPU F -66A
Last Completed: 12/21/2020
Hilcom Alaska, LLC PTD: 196-162
Ori& DF Elev.: 415'/ Gl. Elev.:12.4' (N22E)
DF to C59 ft Spool =28.50' IN 22E)
To= 18,823! (MD) /TD =7,793'(TVD)
PBTD=18,719 (MD) / PBTD= 7,719'MD)
TREE & WELLHEAD
Tree
2-9/16" SM CI W
Wellhead
11"x7" FMC Gen 5A 5M Double
7"
Actuated Gen 5 Wellhead
OPEN HOLE/ CEMENT DETAIL
20"
250 sx of Arcticset I (A rox) in a 24" Hole
9-5/8"
1,675 sx PF 'E' & 700 sx Class'G' in a 12 -1/4"
7"
-Hole
1 250 sx Class 'G' in a 8-1/2" Hole
CASING DETAIL
Size
Type
Wt/Grade/Conn
ID
Top
Btm
BPF
20"
Conductor
91.1/H-40/N/A I
N/A
I Surface
112'
0.3553
9-5/8"
Surface40
/ L-80 / BTRC & BTC
8.835
Surface
18,080'
0.0758
7"
Production
26/L-80/BTC MOD
6.276
Surface
18
%,'
0.0383
TUBING DETAIL
2-7/8" Tubing 6.5/ L-80 / EUE 8rd 2.441 I Surface ±1g,106' 0.00579
WELL INCLINATION DETAIL
MP @ 500'
Max Hole Angle = 75° to 76° f/ 8,400' —16,800'
Hole Angle through perf interval = 47'
STIMULATION SUMMARY
10/23/96-53 M lbs. 16/20 Carbolite behind pipe.
JEWELRY DETAIL
No
Depth
Item
1
205'
GLM STA#1:1"KBMM W/Screen Orifice
2
18,041.6
Discharge Head: 400-B/O
3
18,042'
Pump 2: 40OPMSXD 141- P6
4
18,058'
Pump 1: 40OPMSSD 196-P6
5
18,077'
Gas Separator: 538GRS FER N AR
6
18,080'
Upper Tandem Seal: GSB3DB H6 SB/AB PF SA
7
18,087'
Lower Tandem Seal: GSB3DB H6 SB/AB PF SA
8
18,094'
Motor: 562XP— 100H p/ 1,802V/ 34A
9
18,102'
XT -150 Pheonix5ensor w/ Centralizer: Bottom @ 18,106'
PERFORATION DETAIL
Sands
Top (MD)
Btm (MD)
Top (ND)
8tm (ND) FT Date Status
Kup.ASands
18'442
18'488
7,527'
7,559' 46 10/10/1996 Open
18,500'
18,545'
7,567'
7,598' 45 10/10/1996 Open
Ref Log: 10/9/96 GR/CCL —22gm. Atlas 3-3/8" lumbo Jet Charges 6SPF @ b0° Phasing n — EHD=0.76"/ TTP=6.4"
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E -10/4/1996
ESP Completion by Nabors 4ES 11/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWO ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
RWO ESP by Innovation -12/21/2019
Revised By TDF 1/7/2020
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig API Number
Well Permit Number
Start Date
End Date
MP F -66A
Innovation 50-029-22697-00-00
196-162
12/12/2019
12/21/2019
12/11/2019 - Wednesday
No operations to report.
12/12/2019 -Thursday
Prep modules for rig move. Jack up mods. Peak on location @ 08:00 hrs. Move off well F-37 and stage all rig mods on
location. Finish laying mats. Spot sub over F-66. Set catwalk, pipeshed, pits and gen mod. Hook up innerconnect svc lines
between modules. Sent notification to AOGCC for upcoming BOP test. PJSM Scope up Derrick. Bridle down and store lines.
Work on rig acceptance checklist. Put MP #1 back together. Troubleshoot crown light plug in at Derrick Board. PJSM Rig up
Pit Mod interconnects. Cont working on rig acceptance checklist. Function test Top Drive. Cont. working on MP #1. Take on
580 bbls 8.3 ppg source water at 22:00. Rig up lines in Cellar for well kill. 460psi observed on IA at 23:30. R/U small bleed
tank and start bleeding off IA. Perform post rig move Derrick inspection and grease Crown. Function test Mud Pumps
through bleeder. Rig accepted at 00:00. PJSM Cont.bleeding down IA to small bleed tank. Stage and R/U flow back tank to
IA. Cont. bleeding down IA to flow back tank. SIMOPS Attempt to Pressure test stand pipe and Top Drive. Suspected ice plug.
Work on thawing out stand pipe and Kelly Hose. Take on another 290 bbls 8.3 ppg source water. PJSM IA Press Opsi, OA
140psi. R/D flow back lines and R/U IA to Kill Line. Pump 10 bbls down IA. Shut in and test kill lines to 2,500psi. Bullhead 95°
F 8.3 ppg source water at 2 bpm ICP 30psi. Stage pumps up to 4 bpm caught Press at 182 bbls away. OA Press at 840psi.
Reduced pumps to 2 bpm W/ Press limiter set at 1,300psi. OA Press 880psi at 240 bbls away. Cont bullheading at 2 bpm
staging Press limiter up to 1,800psi injecting at 1.25 bpm OA 920psi at 375 bbls away. Cont working on thawing stand pipe
and Kelly Hose.
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig I API Number
Well Permit Number StartDate
End Date
MP F-66A
Innovation 1 50-029-22697-00-00
196-162 12/12/2019
12/21/2019
12/13/2019 - Friday
Continue bullheading down IA (7" x 2-7/8") staging up to max 2 bpm, withpsi climbing to 2,500psi. Monitor OA throughout
w/ startingpsi 460 and 1250 maxpsi. Back pump rate down to 1.5 bpm, 2,OOOpsi to reduce OApsi to 980. Pump 520 bbls
heated 8.3 ppg Source water. Shut down and monitor well. Initial shutpsi 1700 on IA, 950psi OA. IA dropped to Opsi over 20
mins, OA dropped to 630 and stabilized. Attempt to pull BPV to reverse circulate, hadpsi underneath. R/U and bullhead 104
bbls 8.3 ppg heated source water (80° F) down 2-7/8" tbg staging up to 3 bpm whilepsi continually climbed to maxpsi pump
set point @ 2,500psi. Pump rate reduced to 2 bpm maintaining 2,500psi. Shut down, monitored well -tbg 2,200psi to zero
over 20 mins and IA dropped to 250psi. Bled back 5 bbls and shut IA withpsi @ 75. OA dropped from 850psi to 600-620psi
then stabilized over 20 mins. Open IA to flowback tank with a total of 10 bbls heated source water / crude oil / gas bled back
then went static. Pull BPV and install TWC. Tbg on vac. N/D tree. Install XO to verify threads (left hand acme 8.5 turns). N/U
13-5/8" 5M BOP's on 7-1/16" 5M tubing head w/ 7-1/16" x 13-5/8" DSA. 2-7/8" x 5-1/2" VBRs UPR's and LPR's. Blinds in
middle gate. N/U kill, choke lines and 4 pt stack, center same. PJSM Obtain RKB measurements. Install X/O and test sub on
Top Drive. M/U X/O to side entry sub, 4" TIW, 4" Dart to 2 7/8" test jnt W/ donut. Flood Choke, Stack and Kill W/ H2O. Shell
test to 2,500psi. Test H2S 10-20 ppm, LEL 20-40%, PVT high/ low level alarms. PJSM BOPE Test 250psi low 2,500psi high 5
min on chart. Test 2.875" X 5.5" VRB Upper and Lower, upper and lower IBOP, 4" Dart, 4" TIW, Annular, CMV 7-13 & 15,
Mezz Kill, Manual Kill. Trouble shoot leak and found HCR Kill leaking. Monitor IA W/ Bleed Tank, seeing slight Gas, stopped
at 00:00. PJSM Found Ram door seal leaking, tightened bolts. Retested 2.875" CMV 7-10, Upper Rams (P/F) & Manual Kill.
Pull 2 7/8" Test Joint. Test Blinds and CMV 1-3 & 14. Koomey draw drown Initial System 2,950psi, Manifold 1,550psi,
Annular 1,450psi, after System 1,450psi, Man 1,400psi, Annular 1,450psi. 200psi increase 26 Sec, full charge 100 sec.
Nitrogen 6 bottle average 2,325psi. R/U 4" testjoint. Fix high Press hose fitting and 1502 0 Ring on pump in sub. Test W/ 4"
test Joint, 2.875" X 5.5" VRB Upper and Lower, Annular, HCR Choke, Manual Choke (F/P). Bleed air out of Choke Manifold
for Super Choke test. SIMOPS Move flow back tank and spot Spooling Unit.
12/14/2019-Saturday
Continue testing BOP's 250/2,500psi w/ 5 min hold on each. Witnessed by AOGCC rep Guv Cook. Attempt to test super
choke and manual choke. Failed first attempt but passed after flushing thru chokes and re-testing. Rebuild HCR kill (washed
seat) and re-test. Failed test, rebuild a second time and re-test with same results. R/D and B/D kill. Replaced HCR kill and re-
test (passed). Test surface lines 2,500psi (ok). PJSM, Blowdown choke. R/U on I/A to poor boy degasser. Monitor I/A while
rigging down and vac out stack to remove TWC (debris in profile). I/A no fluid with slight gas venting initially then static.
Finish rigging up Weatherford casing equipment and function test same. Flush top of BPV profile to remove
obstruction/debris from retrieval profile. Bring Centrilift tools to rig floor and stage same. Used a solid puller for TWC.
Found a piece of rubber and compressed scale in TWC. Set BPV due to bails not long enough for TIW. P1SM Monitor IA W/
1" hose in 5 gallon bucket with water. Very slight Gas. P/U 2 7/8" Landing Jnt and M/U X/0 to 3" left hand ACME. Screw into
Hanger and BOLDS. Unseat Hanger W/ 104K. Pumped 40 bbls Source Water down hole, monitor well W/ hand held gas
meter. Observed intermittent max 20% LEL during pumping. Shut down pumps and no Gas detected. Shut in Annular and
monitor well for 10 min, no Press seen. Tubing string broke over at 144K to 135K P/U. Terminate ESP and L/D Hanger. POOH
2.875" 6.5# L-80 EUE and ESP cable as per tally kicking out bad jnts as per plan F/ 18,086' to 17,496' M D. Once enough ESP
cable was pulled attach cable to Spooler drum. Filling hole W/ 10 bph 8.4 ppg source water. PJSM POOH 2.875" 6.5# L-80
EUE and ESP cable as per tally racking back stands and kicking out bad jnts as per plan F/ 17,496' to 12,487' MD. P/U 97K,
SLK 49K Strapping stands in Derrick. Filling hole W/ 12 bph 8.4 ppg source water.
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig API Number
Well Permit Number Start Date End Date
MP F -66A
Innovation 50-029-22697-00-00
196-162 12/12/2019 12/21/2019
12/15/2019 -Sunday
PJSM, POOH 2.875" 6.5# L-80 EUE ESP completion as per tally rack back stds and L/D bad jnts as per plan F/ 12,487'to
6,980' MD. P/U 74K, S/O 46K. Strap stands in derrick. Fill hole W/ 10 bph 8.4 ppg source water until 08:30 hrs then increase
to 35 bph to help minimize any swab potential caused from passible packing off around ESP assy. Continue POOH 2.875"
6.5# L-80 EUE ESP completion as per tally rack back stds and L/D bad jnts as per plan F/ 6,980' to 5,594' MD. P/U 65K, S/0
52K. Strap stands in derrick. Fill hole W/ 35 bph 8.4 ppg source water/ no returns. Post BOP report emailed to AOGCC.
Continue POOH laying down 2.875" ESP completion as per plan F/ 5,594'to 5,266' MD. P/U 65K, S/0 52K. Fill hole W/ 35
bph 8.4 ppg source water/ no returns. Saw flow out top of tubing (oil/diesel/source water). Stab valve and Kelly up. Stage
up to 3 bpm, 330psi. Saw return flow after 18 bbls. Staged up to max rate 7.4 bpm, 1785psi. Saw gas start breaking out @
btms up along with oil/diesel mixed with source water. MW out 8.2 ppg. No pit gain. Shut down and monitored well
(dropping @ —25-30 gph static loss rate). Worked pipe while watching fluid, did not see any swabbing indicating packoff
around assy. B/D TDS. Lineup on TT. Continue POOH laying down 2.875" ESP completion as per plan F/ 5,266' to 4,000' MD.
P/U 65K, S/0 52K. Fill hole W/ 35 bph 8.4 ppg source water (34 bbl loss for this time log trip interval). PJSM Cont POOH L/D
2.875" Tubing W/ ESP F/ 4,000' to 74' MD. P/U 39K, SLK 39K Calc Disp 10 bbls, actual 155 bbls, lost 145 bbls. Static loss rate
20-25 bph. Break out AVA Ported Nipple. Change ESP Cable to MT spool at 2,889' MD. Pulled at total of 570 Jnts,. PJSM L/D
Handing pup jnt, Remove 2.875" Elevators and put wire rope sling thru Bails. P/U and drain lube oil F/ pump and L/D pump.
PJSM L/D Upper and lower Tandem Seals, Motor and Centralizers. Light scale seen around pump housing. Motor oil was
burnt and 2' section motor lead damaged W/ no armor. Appears to have been damaged by the Gas Separator. Final Lasalle
clamp count 488 ea, Protectilizers 5 ea, Flat Guard 3 ea. 380 good 2.875" jnts, 190 bad jnts 2.875" jnts. PJSM Clean and clear
rig floor. R/D Weatherford Power Tongs. Spool up ESP cable F/ rig floor to Spooler. L/D all Baker Centrilift tools. Unload
2.875" Tubing F/ Pipe Shed. Load 43 Jnts 4" D.P. & TST 3 Packer in Pipe Shed. Load rig floor W/ 4-3/4" Oil Jars, 4-3/4"
Bumper Sub and X/O's. Static loss 17 BPH. M/U Mouse Hole,. PJSM Grease Crown, Blocks, Top Drive, Wash Pipe, Spinners
and Drawworks. Check oil in Top Drive. PJSM P/U M/U 6.125" Bit (15 X 3 Jets), 7" Scraper and 4" D.P. 14# S-135 HT 38 as per
Baker. Static loss rate 17 bbls.
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig API Number
Well Permit Number
Start Date
End Date
MP F -66A
Innovation 50-029-22697-00-00
196-162
12/12/2019
1 12/21/2019
12/16/2019 - Monday
Cont. P/U M/U X/O (1.36'), TST 3 Packer (15.08'), 4-3/4" Bumper Sub (7.54'), 4-3/4" Oil Jars (11.08'), X/O (1.66') Total length
BHA 74.24' as per Baker Rep. RIH W/ Scraper and TST 3 Packer Assy single in hole 4" 14# S-135 F/ Pipe Shed F/ 74' to 9,019'
MD.P/U 123K, SLK 74K. Well started "U" Tubing shut down hole fill. Fill 8-10 bph 8.4 ppg Source Water. Service traveling
equipment and skate. C/O hydraulic hose on skate. PJSM RIH W/ Scraper and TST 3 Packer Assy single in hole 4" 14# S-135
F/ Pipe Shed F/ 9,019' to 14,895' MD.P/U 171K, SLK 77K. L/D single Bit depth 14,855' MD. Fill 8 bph 8.4 ppg Source Water.
PJSM Rotate left hand turns working down 10 turns in 2 turn increments max trq 7K P/U 171K, SLK 77K. Set TST 3 at 14,810',
Bit depth 14,855' MD. Set down 25K to confirm Packer set. Fill hole W/ 28 bbls 8.4 ppg Source Water. Flood Choke and Kill
lines. Close Upper 2 7/8" X 5" VRBS. R/U test Equip. PJSM Cont. R/U test Equip. Test 7" Csg to 2,100psi for 30 Min on chart.
Pumped 3.5 bbls, bled back 3.4 bbls. R/D and blow down test Equip. PJSM Rotate 9 right hand turns while P/U slowly. Max
TRQ set 10K. Slack off weight 81K and verify TST 3 Packer was released. Once Packer seals disengaged W/ hole fill pump on
took 19 bbls to get returns. Break out of string and bleed air out of TIW. Kelly back up to string. PJSM Surf to Surf. Break Circ
W/ 8.4 ppg 100° F Source Water and Condit at 4 bpm 660psi. About 60 bbls into Circ. Heavy Oil/ Diesel/ Gas was seen. Max
Gas 1,4000. Started dumping overboard. Elevated LEL was seen on the rig floor Gas Detector, may have been caused by
high winds. Shut down and monitor well, fluid dropping in well. No sign of well control situation. Decision was made to close
annular and Cont. Circ through Super Choke and Gas Buster due to Gas breaking out. Cont. pumping at 4 bpm 640psi
through Gas Buster dumping Oil/ Diesel/ Gas. Dumped a total of 85 bbls. Cont. Just prior to BU started seeing Oil and slight
Gas, dumped 90 bbls. Well cleaned up. Total dumped 175 bbls. Dynamic rate at 28 bph. Shut in Choke and no Press. Open
well static loss was observed. Monitor well W/ hole fill pump on 24 bph loss rate. Kelly down, blow down Top Drive, Choke,
Kill and Manifold. PJSM POOH L/D 4" D.P. to Pipe Shed F/ 14,855' to 14,700' MD. P/U 144K SLK 94K. Running hole fill pump.
12/17/2019 -Tuesday
Cont POOH L/D 4" D.P. to Pipe Shed F/ 14,700' to BHA' MD. Calc Disp 81, actual 290 bbls. Lost 209 bbis. At 3,180' MD fluid
was UTubing out of stump. Shut down hole fill for 10 jnts, filling 6 bbis every 10 jnts. Topping off hole every 40 jnts. Dynamic
loss rate "'18 bph. PJSM L/D 4-3/4" Oil Jars, 4-3/4" Bumper Sub, TST 3 Packer and 7" Scraper as per Baker Rep onsite. Static
loss rate 14-15 bph. PJSM Clean and clear rig floor. Prep Pipe Shed for 2-7/8" Tubing. Service Skate, grease Crown, Blocks,
Top Drive and Drawworks. SIMOPS Load 2-7/8" Tubing in Pipe Shed. PJSM Cont. loading and processing 2-7/8" Tubing in
Pipe Shed. Bring 314 Cannon Clamps, 616 pins and Baker Job Box to rig floor. Remove Elephant Trunk from ESP Sheave in
Derrick. Load ESP Motor Assy in Pipe Shed. Static loss rate 14-15 bph. PJSM P/U M/U 5.95" Cebtralizer, Phoenix XT -150
Gauge Motor, MTR 562XP 100 HP, Lower and upper Tandem Seals, Gas Separator, Pump 400PMSSD, Pump 400PMSSD, Bolt
on Discharge Head and 10'2.875 Pup. (Total 74.65') Oil and work out air. M/U Motor Lead and test. Phase to Phase 4.2
ohmz, Phase to Ground 2.86 Gomhz. Press intake, Temp and Motor Temp good. Lower & Upper 2 ea, Separator 1 ea, Pump
1 & 2 4 ea, total 13 specialty clamps. Static loss rate 12-13 bph. PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 75'to 232'
MD. Rabbit (2.375" OD) tubing off skate. TRQ to 2,250 ft/Ib. Cannon Clamps as pertally.
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig I API Number Well Permit Number
Start Date End Date
MP F-66A
Innovation 1 50-029-22697-00-00 196-162
12/12/2019 12/21/2019
12/18/2019 - Wednesday
PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 232' to 7,854' MD. P/U 63K, SLK 59K Rabbit (2.375" OD) tubing off skate.
TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Test ESP every 1,000' MD. Calc Disp 23 bbls, actual 92 bbls, lost 114 bbls.
PJSM Set TIW and perform ESP splice to new spool. Test Splice, good. Monitor hole W/ hole fill pump static loss rate 13 bph.
SIMOPS Remove 4" D.P. F/ pipe Shed. PJSM RIH W/ ESP on 2.875" 6.5# L-80 EUE 8rd F/ 7,854'to 8,991' MD. P/U 74K, SLK
61K. TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Test ESP and found Phase to Phase good ( 7 omhs) Ground to ground,
bad. Used two separate meters. Calc Disp 3 bbls, actual 42 bbls, lost 45 bbls. Splice at 8,105' MD. PJSM POOH W/ ESP 2.875"
F/ 8,991' to 7,919' MD P/U 76K, SLK 61K Lost 24 bbls. Cut splice and check Reel ESP cable, good. Down hole ESP Ground to
ground, bad. Gather Elephant trunk and drain hose for POOH. R/U to POOH. Cut splice and check Reel ESP cable, good.
Down hole ESP Ground to ground, bad. Gather Elephant trunk and drain hose for POOH. R/U to POOH. PJSM Rig up to
POOH, RIH 2 stands F/ 7,919' to 8,045'MD W/ rope attached to ESP cable to bring back down to rig floor. Attache and rig up
Elephant trunk & drain hose to sheave. POOH F/ 8,045' to 7,857' MD pulling ESP Cable and attaching it to spool in Spooler.
Static loss rate 12 bph. PJSM POOH racking back 2.875" Tubing W/ ESP F/ 7,857' to 4,789' MD P/U 63K, SLK 53K checking
ESP cable for any signs of damage.
12/19/2019 - Thursday
PJSM POOH racking back 2.875" Tubing W/ ESP F/ 4,789' to ESP' MD Checking ESP cable for any signs of damage. Adding 12
bph 8.4 ppg Source Water. PJSM L/D Pup/ Discharge Head, both pumps, Gas Separator and Lower and Upp Tandem Seals as
per Baker Rep onsite. Found damaged armor on MLE cable on Upper and Lower Tandem Seals. PJSM Lower ESP cable to
spooling unit to get new MLE splice put on. Remove Elephant Trunk F/ sheave in Derrick. Clean and clear rig floor. Monitor
well on TT, static loss 12 bph. PJSM P/U M/U 5.95" Cebtralizer, Phoenix XT-150 Gauge Motor, MTR 562XP 100 HP, NEW
Lower and Upper Tandem Seals, Gas Separator, Pump 400PMSSD, Pump 400PMSSD, Bolt on Discharge Head and 10' 2.875
Pup. (Total 74.65') Oil and work out air. M/U Motor Lead and test. Phase to Phase 4.4 ohms, Phase to Ground 3.1 Giga
omhs. Press intake, Temp and Motor Temp good. Motor & Lower & Upper Seal Assy 3 ea Flat Gaurds & 3 ea Carbon Steal
Super Bands, Pump 1 & 2 4 ea Specialty Clamps, total 17 on ESP. Static loss rate 12-13 bph. PJSM RIH ESP W/ 2.875" stands
F/ the Derrick F/ 75'to 3,300' MD. TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Static loss rate 12 bph. Checking ESP every
1,000' MD. Replacing bad jnt 9 W/jnt 206 galled pin. Calc Disp 7 bbls, actual 43, total loss 50 bbl. PJSM RIH ESP W/ 2.875"
stands F/ the Derrick F/ 3,300'to 7,932' MD. P/U 75K, SLK 60K TRQto 2,250 ft/Ib. Cannon Clamps as per tally. Checking ESP
every 1,000' MD. Replacing bad jnt 9 W/jnt 206 galled pin. Calc Disp 9 bbls, actual 49, total loss 58 bbl. PJSM Set TIW and
make up splice on ESP cable to new reel as per Baker Rep onsite.
Hilcorp Alaska, LLC
Weekly Operations Summary
Well Name
Rig API Number
Well Permit Number
StartDate End Date
MP F -66A
Innovation 50-029-22697-00-00
196-162
12/12/2019 12/21/2019
12/20/2019 - Friday
PJSM Complete ESP Cable splice to new reel. Splice at 8,108' MD. SIMOPS Perform Derrick inspection, grease Crown, Blocks,
Top Drive, Drawworks, Spinners, IBOP and check oil. Replace chain binders on Stack W/ Comalongs. Prep cellar and floorfor
upcoming N/D. Check and airtires for rig move. PJSM RIH ESP W/ 2.875" stands F/ the Derrick F/ 7,932'to 15,925' MD. P/U
92K, SLK 62K TRQ to 2,250 ft/Ib. Cannon Clamps as pertally. Checking ESP every 1,000' MD. Replacing bad jnts. Calc Disp
19.4 bbls, actual 142, total loss 162 bbl. PJSM M/U TIW valve. Make ESP splice to new reel as per Baker Rep onsite and test,
good. Monitor well on TT, Static loss rate 16 bph. SIMOPS Lay Herculite and Matt Boards on MPU M-26. PJSM Cont ESP W/
2.875" stands F/ the Derrick F/ 15,925'to 18,068' MD. P/U 112K, SLK 68K TRQ to 2,250 ft/Ib. Cannon Clamps as per tally.
Checking ESP every 1,000' MD. Calc Disp 8 bbls, actual 59, total loss 67 bbl. Install GLM 1" KBMM W/ Screen Orifice at 202'
MD. Total Cannon Clamps 282 ea. Fait Guard 3 ea, Protectolizer 3 ea, 3 SS Superbands 3 Ea. First ESP Splice at 2,019' MD
Second splice at 9,994' MD. Replaced 3 jnts. PJSM Test ESP cable at reel. P/U M/U Hanger and 2.875" landingjoint. Tie off
and cut ESP cable at rig floor. M/U Penetrator to ESP and test as per Baker. RIH Land Hanger & RILDS P/U 112K, SLK 68K. Set
Depth 18,106' MD. Monitor well on TT. Static loss rate 16 bph. PJSM Remove XO on 2-7/8" Landing Jnt. L/D Mouse Hole.
Break down 2-7/8" stand in Derrick. L/D Weatherford tools and Equip. Remove Baker sheave in Derrick. Remove 2-7/8"
Tubing F/ Pipe Shed. Clean Pits. Johhny Whack Tree and flush all surface Equip.
12/21/2019 -Saturday
PJSM Remove Riser, Choke & Kill Lines, Bell Nipple. remove chains and set BOP on pedestal. Remove DSA. SIMOPS Remove
all 4" and 2.875" tools and Eqiup F/ rig floor. Cont. flushing and cleaning pits. PJSM Clean up Hanger void and perform final
conductivity test on ESP, good. Install TWC and N/U Tree. Test void to 500 PSI low 5 min and 5,000 PSI high 10 min. SIMOPS
Cont. Cleaning pits, Strap down Equip on trailers and send to Moose Pad. PJSM R/U and test Tree W/ Diesel. Test Tree to
500 PSI for 5 min, 5,000 PSI high for 15 min.
12/22/2019 -Sunday
No operations to report.
12/23/2019 - Monday
No operations to report.
12/24/2019 -Tuesday
No operations to report.
THE STATE
OIALASKA
GOVERNOR MIKE DUNLEAVY
Chad Helgeson
Operations Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Milne Point Field, Kuparuk River Oil Pool, MPU F -66A
Permit to Drill Number: 196-162
Sundry Number: 319-538
Dear Mr. Helgeson:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
VicPrice
DATED this day of December, 2019.
RBDMS�w DEC 0 9 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
9n AAr. 95 9R0
RECEIVED
NOV 2 6 019
AO �
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Change Approved Program El
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change -out ❑�
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
Hilcorp Alaska LLC
Exploratory ❑ Development Q
Stratigraphic Service
El
196-162
3. Address: 3800 Centerpoint Dr, Suite 1400
6. API Number:
Anchorage Alaska 99503
50-029-22697-01-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? C.O. 432D
Will planned perforations require a spacing exception? Yes ❑ No ❑�
MILNE PT UNIT F -66A
9. Property Designation (Lease Number): ADL -00 10. Field/Pool(s):
ADL0355016 I "" �SS$O t $ MILNE POINT / KUPARUK RIVER OIL
11. PRE ENT ikELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft):
Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
18,823' 7,793'
18,718' 7,719' 1,121 N/A N/A
Casing Length
Size MD TVD Burst Collapse
Conductor 112'
20" 112' 112' N/A N/A
Surface 8,223'
9-5/8" 8,223' 4,506' 5,750psi 3,090psi
Production 18,799'
7" 18,799' 7,776' 7,240psi 5,410psi
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
See Schematic
See Schematic
2-7/8"
6.5# / L-80 / EUE 8rd
18,107'
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
N/A and N/A
N/A and N/A
12. Attachments: Proposal Summary Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑✓
Exploratory ❑ Stratigraphic ❑ Development ❑✓ Service ❑
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: 12/9/2019
OIL Q WINJ ❑ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Chad Helgeson Contact Name: David Haakinson
Authorized Title: Operations Mara 9er Contact Email: dhaakinson hilCO .0 rn
Contact Phone: 777-8343
Authorized Signature: Date: 11/25/2019
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
—
Plug Integrity ❑ BOP Test 1 Mechanical Integrity Test E] Location Clearance ❑
j
Other: ;Z5,0 QS.% 1'
`'� '
CFl—�
Post Initial Injection MIT Req'd? Yes ❑ No RBDMS_... DEC 0 9 2019
�❑/
Spacing Exception Required? Yes ❑ No Subsequent Form Required: �^
EV .iV
APPROVED BY
COMMISSIONER THE COMMISSION Date: \i
Approved by: \ 1XI
�Y65 RI�/1�IN�
FJ1 OA03 Revised 4/2017 Approved applicaO it v�I GI ih, t Lthe date of approval.
,012X y
Submit Form and
ti,1t.1akhments iy Duplicate
n
Hikoru AIa k., LL,
ESP Change -Out
Well: MPU F-66
Date: 11-25-19
Well Name:
MPU F-66
API Number:
50-029-22697-01
Current Status:
Shut-in ESP Producer
Pad:
F -Pad
Estimated Start Date:
December P, 2019
Rig:
Innovation
Reg. Approval Req'd?
Yes
Date Reg. Approval Rec'vd:
Regulatory Contact:
Tom Fouts
Permit to Drill Number:
196-162
First Call Engineer:
David Haakinson
(907) 777-8343 (0)
(307) 660-4999 (M)
Second Call Engineer:
Taylor Wellman
(907) 777-8449 (0)
(907) 947-9533 (M)
AFE Number:
I
Job Type:
ESP Swap
Current Bottom Hole Pressure: 1,734 psi @ 7,293' TVD
Maximum Expected BHP:
1,850 psi @ 7,293' TVD
MPSP:
1121 psi
Max Inclination
77° @ 10,543' MD
Max Dogleg:
3.7'/100ft @ 2,600' MD
BPV Profile:
2-1/2" CIW Type H
Downhole Gauge: 3 -week PBU (8/29
60 -day PBU Extrapolation 14.9 PPG
Gas Column Gradient (0.1 psi/ft)
Brief Well Summary:
MPU producer F-66 was drilled and completed as a Kuparuk A sand producer in October 1996. A fracture
stimulation treatment was pumped on the A -sand, however, the job screened out early into the pumping. The
well was then completed with an ESP completion without perforating the C -sand. The well has a history of
flowing at colder temperatures and developing paraffin buildup in the tubing down to 3,500' MD. The last ESP
swap was completed in September 2007.
Notes Regarding Wellbore Condition
• ESP failed due to downhole short on 8/30/19.
• The 7" production casing passed an MIT to 3,500 psig on 9/29/1996
o Top of cement at 14,784' MD based on 121 bbl cement displacement and assuming 30% excess
hole volume.
Objective:
• Pull 2-7/8" Tubing String, Centrilift ESP, and Centrilift Motor
• Perform 7" Casing Scraper Run g �F
• Pressure test 7" Casing to,;56dpsig/
Z Psy�
• Install new ESP completion MOO PS..
Pre -Rig Procedure:
1. MIRU Slickline unit
a. Pull BPI sleeve from AVA ported nipple @ 17,966' MD
b. Pull OV from GLM @ 139' MD.
c. Set DV in GLM @ 139' MD.
d. RD Slickline Unit
2. RU LRS and PT lines to 3000 psi.
3. Pum 1 IA volume 565 bbls with 8.3
Pump ( ) ppg source -water down IA.
4. Bullhead 108 bbls of 8.3 ppg source -water down tubing to the formation./
5. Clear and level pad area in front of well. Spot rig mats and containment.
ESP Change -Out
Well: MPU F-66
Illlcom Alaska, LL
Date: 11-25-19
6. RD well house and flowlines. Clear and level area around well.
7. Confirm well is dead. Freeze protect tubing/casing as needed with 60/40 McOH.
a. Due to the low reservoir pressure, a tubing freeze protect should not be needed.
b. Freeze protect is up to the discretion of the Wellsite Supervisor depending on timing for arrival of
the rig.
8. RD Little Red Services.
Brief RWO Procedure:
9. MIRU Hilcorp Innovation Rig, ancillary equipment and lines to returns tank.
10. Check for pressure and if 0 psi, pull BPV. If needed, bleed off any residual pressure off tubing and
casing. If needed, kill well w/ 8.3 ppg source -water prior to pulling BPV.
11. Set TWC.
12. Test BOPS to 250 psi Low/ 2,500 psi High, annular to 250 psi Low/7 900 psi High (hold each ram/valve
and test for 5 -min). Record accumulator pre -charge pressures and chart tests.
a. Notify AOGCC 24 hours in advance of BOP test.
y ti� b. Perform Test per Innovation BOPE Test Procedure
Nfl{ c. Confirm test pressures per the Sundry Conditions of approval.
s
d. Test VBR ram on 4" DP and 2-7/8" test joints
e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
13. Contingency: If BOPE test fails
a. Notify Operations Engineer (Hilcorp), Mr. Guy Schwartz (AOGCC) and Mr. Jim Regg (AOGCC) via
email explaining the wellhead situation prior to performing the rolling test. AOGCC may elect to
send an inspector to witness test.
b. With stack out of the test path, test choke manifold per standard procedure
c. Conduct a rolling test: Test the rams and annular with the pump continuing to pump, (monitor the
surface equipment for leaks to ensure that the fluid is going down -hole and not leaking anywhere
at surface).
d. Hold a constant pressure on the equipment and monitor the fluid/pump rate into the well. Record
the pumping rate and pressure.
e. Once the BOP ram and annular tests are completed, test the remainder of the system following the
normal test procedure (floor valves, gas detection, etc.)
f. Record and report this test with notes in the remarks column that the tubing hanger/BPV profile /
penetrator wouldn't hold pressure and rolling test was performed on BOP Equipment and list
items, pressures and rates.
14. Bleed any pressure off casing to returns tank. Pull TWC. Kill well w/ 8.3 ppg source -water as needed.
15. Rig up spooler for ESP #1 RD cable.
a. Baker Hughes representative should be onsite for ESP pull.
16. MU landing joint or spear and PU on the tubing hanger.
a. The 2007 Nabors 4ES ESP completion PU weight was 110 Klbs with a Slack -off Weight of 26 Klbs.
b. If needed, circulate (long or reverse) pill with lubrican ource-water, and/or baraclean pill prior to
laying down the tubing hanger.
17. Recover the tubing hanger.
ESP Change -Out
Well: MPU F-66
Itilcorn Alaska, LL'
Date: 11-25-19
Contingency (If a rolling test was conducted): MU new hanger or test plug to the
completion tubing. Re -land hanger (or test plug) in tubing head. Test BOPE per standard
procedure.
a. Evaluate pulled tubing hanger for possible thread damage. If any damage is found, dispose of
tubing hanger and contact well head specialist for replacement.
18. POOH and lay down the 2-7/8" tubing. Lay down ESP and motor.
a. Note any sand, scale, or corrosion on the tubulars and ESP on the morning report.
b. Send tubulars and equipment to G&I for washing.
i. Re -use of tubulars will be dependent upon tubing caliper results. Caliper results are not
available at the time of procedure submittal.
c. Develop Material Transfer form and indicate the following:
i. Discard tubulars and AVA ported Nipple
ii. Inspect 2-7/8" GLM and add to field inventory if no damage is found to threads or body.
d. The old completion has the following amount of clamps/guards:
i. Splice in power cable @ 5,111' MD
ii. 488 LaSalle Clamps
iii. 5 Protectolizers
iv. 3 Flat Guards v
19. PU 7" 26#/ft casing scraper BHA and RIH to 14,900' MD with 4" DP. f e k-
20. Pull up -hole and reciprocate and circulate from 14,750' to 14,850' MD.
21. POOH and LD casing scraper assembly.
22. PU 7" 26#/ft test packer and RIH to ±14,800' MD with 4" DP.
23. Pressure test 7" casing to 1,900 psig:
a. Pressure IA up to 2,100 psig and perform a Charted MIT -IA for a minimum target pressure of 1,900
y psi for 30 min (charted).
24. PU new ESP and RIH on 2-7/8" 6.54 L-80 tubing. Set base of ESP assembly at±18,100' MD.
a. Test connectivity of ESP cable every 2,000'.
b. Install Cannon Clamps on every other joint.
c. A combination of used and new tubulars will likely be run on this RWO.
25. Completion Outlined as below:
a. Upper 2-7/8"x 1" Side -pocket GLM @ ±200' MD with 0.25" OV
b. 2-7/8" tubing
i^ C. Downhole gauge for discharge temperature and pressure.
i. Connected with a jumper from the lower sensor. Does not require a separate tech -wire.
d. Baker Hughes P6 ESP
e. Gas Separator
f. Baker Hughes 562XP Motor
g. Motor gauge
h. Base of ESP centralizer @ ±18,100' MD
26. Land tubing hanger. RILDS. Lay down landing joint. Note Pick-up and slack -off weights on tally.
ESP Change -Out
Well: MPU F-66
IIilmni Alaska, LII
Date: 11-25-19
27. Set BPV.
28. ND BOPE. NU 2-9/16" 5,000 # tree and adaptor flange.
29. Pull BPV. Set TWC.
30. Test tubing hanger void to 500 psig low / 5,000 prig high. Test tree to 500 psig low / 5,000 psig high.
31. Pull TWC.
32. RD Hilcorp Innovation Rig, ancillary equipment and lines to returns tank.
33. Turn well over to production. RU well house and flowlines.
Attachments:
1. As -built Schematic
2. Proposed Schematic
3. BOP Schematic
0
Milson. Alaska, LLC
Orig. DF Elev.: 41.5'/GL Elev.: 12.4 (N22E)
SCHEMATIC
TREE& WELLHEAD
Milne Point Unit
Well: MPU F -66A
Last Completed: 9/12/2007
PTD: 196-162
Tree
2-9/16" 5M CI W
Wellhead
11"x7" FMC Gen SA SM Double
Top
Actuated Gen 5 Wellhead
OPEN HOLE/ CEMENT DETAIL
20" 250 sx of Arcticset I (Approx) in a 24" Hole
9-5/8" 1,675 sx PF'E' & 700 sx Class'G' in a 12-1/4" Hole
7" I 250sx C(ass'G'in a 8-1/2" Hole
CASING DETAIL
Size
Type
Wt/Grade/Conn
ID
Top
Btm
BPF
20"
Conductor
91.1/H-40/N/A
N/A
Surface
112'
0.3553
9-5/8"
Surface
40/L-80/BTRC&BTC8.835
Gas Separator; GRSFTKW/NRRTR(400internals)9'
Surface
8,223'
0.0758
7"
Production
26/L-80/BTC MOD
6.276
Surface
18,799'
0.0383
TUBING DETAIL
2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface 18,107 0.00579
WELL INCLINATION DETAIL
KOP @ 500'
Max Hole Angle = 75° to 76'f/ 8,400'- 16,800'
Hole Angle through pert interval =47 -
STIMULATION
47°STIMULATION SUMMARY
10/23/96 -53 M lbs. 16/20 Carbolite
behind pipe.
JEWELRY DETAIL
TD=18,823 (MD) /TD= 7,793'(TVD)
PBTD=18,718' (MD) / POM = 7,719'(M)
PFRFORATInN DFTAII
SandsfTWop(MD)tm
h
12
Item
Btm (ND) FT Date Status
Kup.ASands1Q488'
STA# 1: KBM M 2-7/8" x 1" w/ DGLV set on 11/23/19
7,527'
6'
2-7/8"AVA Ported Nipple w/ AVA BPI sleeve set on 9/11/07
.9'
Discharge Head: GPDIS
Ref Lag: 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo Jet Charges 65PF @ 6W Phasing n - EHD=0.76" / TTP -6.4"
R18,041.9'
2'
Pump: PMSSD 204/P31
4'
Gas Separator; GRSFTKW/NRRTR(400internals)9'
Upper TandemSeal: G583DBUTSB/SBPFSA6'
Lower Tanm5eal'
Motor: KMH Rerated- 165Hp/2,133V/46A
9 1
18,103' 1
Sensor w/ Centralizer: Pump Mate XTO Bottom
PFRFORATInN DFTAII
SandsfTWop(MD)tm
(MD) Top (TVD)
Btm (ND) FT Date Status
Kup.ASands1Q488'
7,527'
7,559' 46 10/10/1996 O18,545'
J 7,567'
7,598' 1 1 45 1 10/10/1996 Open
Ref Lag: 10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo Jet Charges 65PF @ 6W Phasing n - EHD=0.76" / TTP -6.4"
GENERAL WELL INFO
ECompletion
E44ES
s22E - 10/4/1996
4ES 11/19/1996
/1997
1/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
.0
X31
1
6
Revised By TDF 11/25/2019
R
IIilcorn Alaska, LLC
Orip, DF Bev.:41.5'/GL Elev.:124' (N22E)
PROPOSED
Milne Point Unit
Well: MPU F -66A
Last Completed: 9/12/2007
PTD: 196-162
TREE & WELLHEAD
Tree 2-9/16" 5M CI W
Wellhead 31" x 7" FMC Gen 5A SM Double
Actuated Gen 5 Wellhead
OPEN HOLE/ CEMENT DETAIL
20" 250sxof Arcticsetl(Approx)ina24"Hole
9-5/8" 1,675 sx PF'E' & 700 sx Class'G' in a 12-1/4" Hole
7" 250 sx Class 'G' in a 8-1/2" Hole
CASING DETAIL
Size
Type
Wt/Grade/Conn
ID
Top
Btm
BPF
20"
Conductor
91.1/H-40/N/A
N/A
Surface
112'
0.3553
9-5/8"
Surface
40 / L-80 / BTRC & BTC
8.835
Surface 1
8,223'
1 0.0758
7"
Production
26/L-80/BTCMOD
6.276
Surface
18,79'
1 0.0383
TUBING DETAIL
2-7/8" Tubing 6.5/L-80/EUE 8rd 2.441 Surface ±18,100' 0.00579
To= 18,823' (M7)/TD=7,793'( VD)
PBTD=18,718' (M)) / PBTD= 7,719' TVD)
WELL INCLINATION DETAIL
KOP @ 500'
Max Hole Angle =75 to 76°f/8,400'-16,800'
Hole Angle through pert interval = 47°
STIMULATION SUMMARY
10/23/96 — 53 M lbs. 16/20 Carbolite
behind pipe.
JEWELRY DETAIL
PERFORATION DETAIL
ands
pth
Item
Top (TVD)
0'
GLM STA# 1:
A Sands
PR&Log:
035'
Discharge Head:
7,527'
038'
Ported Discharge Head
40'
WMD::
Pump:
7,567'
65'
Gas Separator:70'
10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo lei Charges 6SPF @ 60' Phasing n
— EHD=0.76" / TTP=6.4"
U er Tandem Seal:75'
Lower Tandem5eal:80'
Motor:98'
Sensorw/Centralizer:Bottom@±18,100'
PERFORATION DETAIL
ands
Top (MD)
Btm (MD)
Top (TVD)
Btm (TVD) FT
Date Status
A Sands
PR&Log:
18'442
18,488'
7,527'
7,559' 46
10/10/1996 Open
18,500'
18,545'
7,567'
7,598' 45
10/10/1996 Open
10/9/96 GR/CCL-22gm. Atlas 3-3/8" Jumbo lei Charges 6SPF @ 60' Phasing n
— EHD=0.76" / TTP=6.4"
GENERAL WELL INFO
API: 50-029-22697-01-00
Drilled and Cased by Nabors 22E -10/4/1996
ESP Completion by Nabors 4E511/19/1996
RWO ESP by Nabors 4ES 7/6/1997
RWD ESP by Nabors 4ES 5/31/1998
RWO ESP by Nabors 4ES 9/26/1999
RWO ESP by Nabors 4ES 5/27/2002
RWO ESP by Nabors 4ES 9/12/2007
Revised By TDF 11/25/2019
Innovation Rig BOP Schematic
9.5/8" DBL D Seal
Casing Hanger
5-22
13-5/8" NOM
9-518" BTC Btm x
10.5"-4 SA Pin Top
W/ Primary Seal
13-518" 5M Control Technology
Annular BOP
0
13-518" 5M Control
o Technology Double Ram
0
�
------'--13-5/8"W Control
Technology Single Ram
13-5/8" x 5M
---11"x5M
\-2-1116" x 5M
13.5/8" x 5M
\-2-1/16"x 5M
-20" Casing
9-5/8" Casing
•
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 2.0'12
Mr. Tom Maunder l
Alaska Oil and Gas Conservation Commission
1
(
333 West 7 Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of MPF -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
. •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
MPF -Pad
10/29/2011
Corrosion
Initial top of Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPF -01 1950450 50029225520000 102 N/A 10.2 N/A 122.4 8/7/2011
MPF-02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011
MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011
MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011
MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011
MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011
MPF -13 1950270 50029225490000 0.2 N/A 0.2 N/A 8.5 10/6/2011
MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011
MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011
MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011
MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011
MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011
MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011
MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011
MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011
MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011
MPF -33 2010620 50029226890000 23 Need top Job
MPF-34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011
MPF -37 1950250 50029225480000 0.2 N/A 0.2 N/A 8.5 10/6/2011
MPF -38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011
MPF -41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011
MPF-42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011
MPF -45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011
MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A
MPF -49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011
MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011
MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011
MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011
MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011
MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011
MPF-61 1951170 50029225820000 62 Need top job
MPF -62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/1/2011
MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011
."----). MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011
MPF -69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011
MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011
MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011
MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011
MPF -77 1951360 50029225940000 0.2 N/A 0.2 N/A 6.8 10/5/2011
MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011
MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011
MPF -80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011
MPF-81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011
MPF-82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011
MPF-83 2000930 50029229630000 1.2 N/A 1.2 N/A 13.6 8/3/2011
MPF -84B 2001760 50029229310200 1.2 N/A 1.2 N/A 10.2 8/3/2011
MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011
MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011
MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011
MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011
MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 10.2 8/3/2011
MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011
MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011
MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011
MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011
MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011
MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011
MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011
MPF -99 2061560 50029233320000 1.3 _ N/A 1.3 N/A - 11.9 8/11/2011
STATE OF ALASKA /p.,~~
ALA OIL AND GAS CONSERVATION COM~SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
^ Abandon ®Repair Well ^ Plug Pertorations ^ Stimulate ^ Re-Enter Suspended Well
^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other '
^ Change Approved Program ^ Operation Shutdown Change out ESP
^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 196-162 -
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22697-01-00 '
7. KB Elevation (ft):
41.50 9. Well Name and Number:
MPF-66 A J~~ ~~ (~ ~
8. Property Designation: 10. Field /Pool(s): _
ADL 355016 ~ Milne Point Unit / Kuparuk River Sands
11. Present well condition summary
Total depth: measured 18823, feet
true vertical 7793 ° feet Piugs (measured) None
Effective depth: measured 18718 feet Junk (measured) 18212'
true vertical 7719 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80' 20" 112' 112' 1490 470
Surface 8192' 9-5/8" 8223' 4506' - 5750 3090
Intermediate
Production 18771' 7" 18799' 7776' 7240 5410
Liner
P
'
'
~~~ ~ g 2007
~~,
erforation Depth MD (ft): 18442
- 18545
Perforation Depth TVD (ft): 7527' - 7597'
Tubing Size (size, grade, and measured depth): 2-7/8", 6.5# L-80 18107'
Packers and SSSV (type and measured depth): None
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final p ressure:
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation: 0 0 0 580 0
Subsequent to operation: 203 35 74 300 282
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work:
^ Exploratory ®Development ^ Service
~ Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Howard West, 564-5471
Printed Name Sondra Stewman Title Drilling Technologist
Si
~
D - Prepared By NametNumber:
~ ~._a~
gn ture f Pone 564-4750 at Sondra Stewman, 564-4750
Form 10-404 Revised 04/2006 ~''~ ~ ('~ I n' n ~a ~~~~ l~b/~ ] ~ ~ Submit Original Only
r ~~"--1
Tree: 2-9/16" 5M CIW ~
Wellhead: 11 " x 7" FMC Gen. 5A
Double actuated gen 5 wellhead
20" 91.1 ppf, H-40 115'
KOP @ 500'
Max. hole angle = 75 to 76 deg.
8400' to 16,800'
Hole angle thru' perfs = 47 deg.
9 5/8", 40 ppf, L-80 Btrc. .822;
2-7/8", 6.5#, L-80 8rd,EUE
(2.441" ID, Cap..00579 bbls
7" 26 ppf, L-80, Btrc.prod. casinc
(top 125 jts have Mod. Btrs, rem
std. Btrs.)
( drift ID = 6.151", cap. = 0.0383
Stimulation Summary
10/23/96 Frac 53 M# of 16/20 c
behind pipe.
Perforation Summary
Ref Iog:Atlas GR/ CCL dated 1
Size SPF Interval (-
'A' Sands
3-3/8" 6 18442'-18488' 752E
3-3/8" 6 18500'-18545' 756E
mid-pert = 7560' tvd
18493' md.
Ori~ Elev. = 41.5 (N 22E}
Orig. GL Elev. = 12.40'
DF To Csg. spool= 28.50' (N 22E)
Cameo 2 718" x 1" 139`
sidepocket KBMM GLM
1ES 9 5/8" ES" 1829'
;ementer
;'8" AVA ported nipple
75" ID through sleeve
59` Min. ID through nipple 17966`
rilift ESP, 18042'
s 204 P11 SXD
rilift Gas Separator 18064`
FTXA
rilift Seal Sections
~sua- ag n~sa 18069`
'y~3L.T AB PFSA CL5
rilift KMH, 18083'
~p motor,2305v /60
~~ 18102`
ipmate XTO w/ 6 fin Cent.
0 7" x 20' marker joints f/ 18,212' -
252' wlm w/ RA tag in top colts
iokiine tagged TD @ i 8685' 9t25i99
"' float collar (PBTD) 18,718'
7" float shoe 18,799'
11/4/96 M. Linder Initial Com letion,#2 4-ES 7/6/97
os3o3isa M. Linder #3 & #4 RWO Nabors 5-S
09/26/99
os/27/o2 M. Linder #5 & #6 RWO Nabors 4-ES
09/12/07 REH ESP RWO by Nabors 4ES
MILNE POINT UNIT
WELL F-66A
API NO: 50-029-22697-01
MPU F-66A
•
BP EXPLORATION Page 1 of 3
Operations Summary Report
Legal Well Name: MPF-66
Common Well Name: MPF-66A Spud Date: 8/21/1996
Event Name: WORKO VER Start : 9/9/2007 End: 9/13/2007
Contractor Name: NABOBS ALASK A DRI LLING I Rig Release: 9/13/2007
Rig Name: NABOB S 4ES Rig Number:
I
Date
From - To Hours Task
' Code NPT Phase ~ Description of Operations
9/9/2007 ~ 08:00 - 09:00 ' 1.00,
RIGD
P
PRE ~ - __ __
Lower & scope down derrick.
~ 09.00 - 15:30 6.50 MOB P PRE ( Move Rig from MPG -07 to MPF -66a.
15:30 - 17:00 I 1.50 RIGU P PRE Raise & scope up derrick. Rig up equip.
17:00 - 19:00 ~ 2.00 RIGU P PRE Spot in pipe shed & pits. Con't to R/U lines & equip.
19:00 - 20:00 '; 1.00 PULL P DECOMP R/U lines to tree & tiger tank. Take on heated seawater.
'' 20:00 - 21:00 1.00 PULL P DECOMP P/U lubricator, test to 1000 psi. & pull BPV. VD lubricator.
21:00 - 21:30 ~ 0.50 PULL P DECOMP Hold PJSM & Pre-Spud meeting. Review wellkill opertaion &
assign tasks to specific personnel.
'i 21:30 - 00:00 2.50 PULL P DECOMP Pressure test lines to 250 / 3500 psi. Open well SITP 600 psi,
SI IAP 550 psi. Open thru choke & bleed off Tbg/Ann to 0 psi.
Begin kill operation, Pump 4 BPM @ 1600 psi, Caught fluid @
i, , 112 bbls. OAP when from 0 to 300 psi. Con't to circulate well.
9/10/2007 ~, 00:00 - 02:30 2.50 KILL DECOMP Con' t to cirulate & kill well. 4 BPM @ 1600 psi. Pumped total
of 810 bbls Had clean hot seawater returns. S/D Well dead.
~, Open both sides ,both on vacuum. Recoverd 515 bbls of fluid.
'~ est. 95% oil. Losses averaged 25% during kill operation. OAP
', incresed to 600 psi, then bled to 300 psi. After kill operation
~ OAP went to 0 psi.
102:30 - 03:30 1.00 KILL DECOMP Monitor well. Hold PJSM.
1
03:30 - 04:30 1.00 WHSUR DECOMP P/U T-bar & install TWC. Pressure test TWC from top w/ 3500
1 psi for 10 min. Pressure test TWC from bottom by pumping 3
BPM @ 60 psi for 10 min. Charted testing.
04:30 - 06:00 1.50 DECOMP Bleed off tubing void. N/D tree.
06:00 - 09:30 3.50 KILL DECOMP Tree removed, inspect hanger threads (3" LH Acme). Screw in
landing joint XO w/ 9 1/2 turns. NU BOPE
09:30 - 13:00 3.50 BOPSU DECOMP BOPE Test 250 psi low / 3500 psi high. Test 13 5/8" Annular,
2 7/8" x 5" VBR, Blind/Shear rams, 3 1/8" Choke, HCR, Kill
line. 13 valves on choke manifold. Also, Koomey drawdown
test. RKB of 20.60'. Well techs shoot fluid level in IA @ 10:00
w/ level @ 2000'.
13:00 - 14:00 1.00 BOPSU DECOMP PUMU Opso-Lopso. Torque up XO to 3" LH Acme for hanger.
Screw into hanger w/ 9 1/2 turns. MU nipple and valve on PI
sub. MU lubricator w/ TWC pulling tool. Pressure test
lubricator and OL to 1000 psi. Pull TWC w/ 0 psi tuibng
~ pressure. Shoot FL in IA @ 14:30 w/ level @ 2000'. Break out
and laydown lulbricator and OL.
14:00 - 15:00 1.00 PULL DECOMP PUMU 3 1/2" IF landing jt w/ XO to 3" LH Acme. Install TIW
I valve on top, torque XO and screw into hanger. BOLDS.
Attempt to pull completion. Pull to 125K max (116K max on
tubing + 12K block wt.) Work pipe numerous times, unable to
pull completion
15:00 - 17:00 ~ 2.00 PULL DECOMP Mix 40 Bbls SW pill w/ EP mud tube. Circulate long way @ 5
BPM, 1600 psi. Catch fluid in tubing @ 22 Bbls pumped,
returns to surface after pumping 88 Bbls. Displace pill through
i AVA sleeve above ESP. Work pipe occasionally while
~ circulating pill. Pull free w/ 125K, PUW of 110 K to pull hanger
to floor. Visually inspect hanger and continue to circulate to
positon EP pill - 4000'
17:00 - 18:00 1.00 PULL DECOMP Break out and laydown hanger and landing joint. RU floor to
~ pull ESP completion Start POOH & stand back 2 7/8"
18:00 - 18:30
0.50
PULL
DECOMP completion.
Crew Change. Inspect derrick. Check PVT alarms.
j 18:30 - 19:30 I 1.00 PULL ~ DECOMP ~ POOH & stand back 2 7/8" ESP completion. Pulled 24 stands.
Printed: 10/3/2007 2:20:49 PM
•
•
BP EXPLORATION Page 2 of 3
Operations Summary Report
Legal Well Name: MPF-66
Common Well Name: MPF-66A Spud Date: 8/21/1996
Event Name: WORKOVER Start: 9/9/2007 End: 9/13/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/13/2007
Rig Name: NABOBS 4ES Rig Number:
'
Date _ From - To Hours
Task 'Code NPT Phase Description of :Operations
9/10/2007 19:30 - 20:00 '', 0.50 PULL _ - -
DECOMP - _ - -
Change out reels in spooling unit.
20:00 - 00:00 ' 4.00 PULL DECOMP Con't to POOH & stand back 2 7/8" completion. Pulled 78
stands.
9/11/2007 00:00 - 02:00 ! 2.00 PULL P DECOMP Con't to POOH & stand back 2 7/8" ESP completion. Pulled
109 stands.
02:00 - 02:30 ; 0.50 PULL P DECOMP Change out reels on Spooling unit.
02:30 - 06:00 3.50 PULL P DECOMP Con't to POOH & stand back 2 7/8" ESP completion. Pulled
165 stands of 189 stds.
06:00 - 08:00 ~ 2.00 PULL P DECOMP Continue POOH w/ ESP completion. Recover 499 LaSalle
I
08:00 - 10:00 '~ 2.00 PULL
P
DECOMP clamps, 3 flat guards, 3 protectalizers.
Break out & UD ESP Assembly. Cable check was balanced
phase to phase, but grounded out. Motor turned freely, pump
I turned but was "stiff".
10:00 - 11:30 1.50 PULL P DECOMP FIII hole w/ 35 Bbls of SW. Secure well for Safety meeting.
Hold weekly safety meeting with alt crew members.
11:30 - 15:00 I
3.50 RUNCO<y 1P j RUNCMP O en blind rams, fill hole w/ 10 Bbls of SW. PU / MU ESP
I ~ ~ BHA. 204P11 - SXD pump on 228 HP KMH motor w/
Pumpmate XTO sensor. Load hole w/ 30 Bbls of SW. Check
~ conductivity of cable - OK.
15:00 - 18:00 I 3.00 i BUNCO P RUNCMP RIH w/ ESP completion on 2 7!8" tubing from Derrick. Install 5
protectolizers, 3 flat guards, and Lasalle clamps on every joint
for the first 410 jts, then every other joint to surface for a total
of 490 LaSalle clamps. Fill tubing while checking conductivity
of cable eve -2,000'. Fill w/ 13 stks / 2200 psi. ESP very
tight. Utilize Best-O-Life pipe dope w/ 2300 ft/Ibs M/U torque.
- Note:Condition of Control cable run is experienced.
18:00 - 23:00 I 5.00 BUNCO P RUNCMP Con't in hole, filling pipe /circulating and checking conductivity
~ every -2,000' @ 1 bpm / 500 psi.
23:00 - 00:00 ~I 1.00 BUNCO P RUNCMP Make reel to reel splice for control cable @ + 8,000' and /std #
81.
9/12/2007 00:00 - 03:00 3.00 BUNCO P RUNCMP Con't to make reel to reel swap for control cable @ + 8,000' and
/std#81
03:00 - 09:00 6.00 BUNCO P RUNCMP Con't in hole w/ ESP completion assembly, filling pipe /
circulating, and testing conductivity every -2000'.
-Install LaSalle clamps on first 410 jts, then every other joint to
surface.
~
} -Total of 488 LaSalle clamps. Make second cable splice @
151 stands in hole (-14000').
09:00 - 13:30 4.50 ~
~ BUNCO P RUNCMP Centrilift splicing ESP cable. (spool to spool splice). Top 3600'
', i
I ~ ~ of ESP cable is NEW cable.
I, ; -Make cable checks /post splice - ok.
', 13:30 - 16:00 ', 2.50; . BUNCO P RUNCMP RIH w/ remaining 39 stands of 2 7/8" tubing from Derrick.
I ~ -Jewelry run = 488 LaSalle clamps, 3 Flat guards, 5
' i Protectalizers.
' 16:00 - 16:30 ' 0.50 ~ BUNCO P RUNCMP PU / MU landing joint and tubing hanger.
16:30 - 18:30 i, 2.00; BUNCO RUNCMP Cut ESP cable and make penetrator splice. Attach Field
connector to Penetrator and test.
' 18:30 - 19:00 ' 0.501 BUNCO RUNCMP ESP completion string PU wt of 81 K / SO wt of 45K.
j Land Tbg hanger. KILOS. UD Landing jt.
19:00 - 20:00 ' 1.00 BUNCO RUNCMP Flush pump w! 10 bbls of SW @ 3 BPM / 40 psi.
( -Set TWC & test from top to 1000 psi f/ 10 min & chart.
Printed: 10/3/2007 2:20:49 PM
~ ~
BP EXPLORATION Page 3 of 3
Operations Summary Report
Legal Well Name: MPF-66
.Common Well Name: MPF-66A Spud Date: 8/21/1996
Event Name: WORKOVER Start: 9/9/2007 End: 9/13/2007
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/13/2007
Rig Name: NABOBS 4ES Rig Number:
Date From - To ';~ Hours Task 'I Code ~, NPT ~ Phase Description of Operations
9/12/2007 19:00 - 20:00 i 1.00 BUNCO P ~ RUNCMP -Attempt to test TWC from below @ 3 bpm / 40 psi f/ 5 min.
~ -R/D & blow down lines.
20:00 - 21:30 ~ 1.50 WHSUR P j ~ RUNCMP N/D BOPs.
21:30 - 23:30 2.OO WHSUR P RUNCMP N/U Tree. Test Tree & void to 5000 psi. Make final check on
ESP.
~ j -BHT= (BHT= 185 F & Motor temp= 185 F).
~ -BHP= 2661 psi.
-Phase to Phase test motor & cable (reading= 6.0 OHMs).
1 j -Phase to Ground= 300 Mega OHMS.
23:30 - 00:00 0.50
1 WHSUR P i RUNCMP P/U Lubricator test to 1000 psi, pull TWC.
9/13/2007 00:00 - 00:30 0.50 i WHSUR i RUNCMP Load BPV into lubricator, test lubricator to 1000 psi.
~ -Set BPV, L/D lubricator.
00:30 - 01:00 0.50 ~ WHSUR RUNCMP Attempt to test BPV.
~ -Pump down annulus @ 3 bpm / 60 psi f/ 16 bbls.
j -R/D lines, secure Tree & cellar.
~ I
-Release Rig @ 01:00 hrs.
Prep for move to MPF-99.
Printed: 10/3/2007 2:20:49 PM
1. Operations Abandon D Repair Well D
Performed: Alter Casing D Pull Tubing D
Change Approved Program D Operat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
~
. STATE OF ALASKA . /~~.O;
ALASØ'OIL AND GAS CONSERVATION COMM..)N
REPORT OF SUNDRY WELL OPERATIONS
D
D
D
RECEIVED
.AN 1 6 2007
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development W '
Stratigraphic
Stimulate [2] ,
WaiverD Time Extension D Anchorage
Re-enter Suspended Well D
5. Permit to Drill Number:
196-1620 ¡
'on
3. Address:
Exploratory
Service
6. API Number:
50-029-22697-01-00 ./
9. Well Name and Number:
41.5 KB
MPF-66A I
10. Field/Pool(s):
MILNE POINT Field/ KUPARUK RIVER OIL Pool /
8. Property Designation:
ADLO-355016 .
11. Present Well Condition Summary:
Total Depth
measured
true vertical
18823 '
7793.2 '
feet
feet
Plugs (measured)
Junk (measured)
None
None
Effective Depth measured 18718 feet
true vertical 7719 feet
Casing Length Size MD TVD Burst· Collapse
Conductor 80' 20" 91.1# H-40 32' - 112' 32' - 110' 1490 470
Surface 8192' 9-5/8" 40# L-80 31' - 8223' 31' - 4506' 5750 3090
Production 18771' 7" 26# L -80 28' - 18799' 28' - 7776' 7240 5410
Perforation depth: Measured depth: 18442 - 18464
True Vertical depth: 7527.28 -7542.41
18464 - 18488 18500 - 18521.._---1852t- 18545
........c "",,,,,..,.-I/''"-'~'''' _','.
7542.41 - 7558.9"'" 7567.21 - 7581.7 7581 :7- 7598.29
Tubing: (size, grade, and measured depth)
2-7/8" 6.5# L-80
o
18098'
Packers and SSSV (type and measured depth)
NONE
o ~-^tI.\M¡:D JAN 25 lOD7
o &w.....
o
o
o
o
o
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
..5¥
. ....
(~BDMS 8Ft .-
2 5 2007
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
34
282
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
7 0 0
55 0 0
15. Well Class after oroposed work:
Exploratory Development W
16. Well Status after proposed work:
Oil P' _ Gas WAG
Tubing pressure
336
301
Service
x
Contact
Gary Preble
WINJ
WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name
Signature
Title
Data engineer
Phone
564-4944
Date
1/15/2007
ORIGINAL
k \'~(L Submit Original Only
rp~; "¿l> I· z..",Q 7
.
.
MPF -66A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
CTU #5. Acid Wash. *** Continued on WSR 1/8/2007 ***. Hard tag at 17920' Lay
in 5 bbls of 12% DAD acid. Squeeze 5 bbls through pump over 60 minutes. Start
pump and circulate 10 bbls of fluid to open top tank holding 300 psi back pressure
over 25 minutes. Squeeze 10 bbls back through pump. Last part of injection
should 600 psi/min bleed off. When 10th barrel was taken through pump, bleed
off of preesure slowed to 250 psi per minute. Decision made by MPU Well Ops
supervisor to POOH and freeze protect well from 2500' with 60/40 meth. Pad
operator notified of status. Standby for weather(-40 F) to rig down. RD CTU.
*** Job complete ***
FLUIDS PUMPED
BBLS
85 1% XS KCI
90 60/40 METH
5 12% DAD ACID (TITRATION: 12.2% HCI; IRON<50 PPM)
180 TOTAL
1. Operations performed:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
z~. Location of well at surface
2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM
At top of productive interval
907' NSL, 2996' EWL, SEC. 20, T14N, R10E, UM
At effective depth
1105' NSL, 3059' EWL, SEC. 20, T14N, R10E, UM
At total depth
1176' NSL, 3082' EWL, SEC. 20, T14N, 'R10E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Structural
Conductor
Surface
Intermediate
Production
Liner
r-i operation Shutdown 1'! Stimulate r'! Plugging I-I Perforate
I~! Pull Tubing D Alter Casing I~ Repair Well I~ Other
5. Type of well:
I~ Development
r"i Exploratory
I"i Stratigraphic
r'-I service
Plugs (measured)
18823 feet
7793 feet
18718 feet
7719 feet
Length
Junk (measured)
Casing
Size Cemented
80' 20"
8192' 9-5/8"
250 sx Arcticset ! (Approx.)
1675 sx PF 'E', 700 sx Class 'G'
18771' 7" 250 sx Class 'G'
Change out ESP
6. Datum Elevation (DF or KB)
KBE = 41.50'
7. Unit' or Property Name
Milne Point Unit
8. Well Number
MPF-66A
9. Permit Number / Approval No.
196-162
, , ,
10. APl Number
50-029-22697-01
, ,,
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
,
MD TVD
112' 112'
8223' 4506'
18799' 7776'
Perforation depth' measured
18442' - 18488', 18500' - 18545'
true vertical 7527' - 7559', 7567' - 7598'
Tubing (size, grade, and measured depth) 2-7t8", 6.5#, L-80 set at 18098'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
RECEIVED
200'2
14.
Oii-Bbl
Prior to well operation:
Subsequent to operation:
15. Attachments
r"] copies of Logs and Surveys run
I~ Daily Report of Well Operations
17. I hereby certify~that the foregoing is tru_g~and correct to the best of my knowledge
Representative Dairy Average Production or Injection Data
Gas-Mcr Water-Bbl
16. Status of well classifications as:
~ Oil I-! Gas I-i Suspended
Form 10-404 Rev. 06/15/88
Casing Pressure Tubing Pressure
Service
Prepared By Name/Number: Sondra Stewman, 564-4750 /~
,SCANNED JUN 2, & '2002 SL~bmi't in Duplicate "-~-.~
,
Legal Well Name' MPF-66A
Common Well Name: MPF-66A Spud Date:
Event Name: WORKOVER Start: 5/24/2002 End: 5127/2002
Contractor Name: NABORS DRILLING CO. Rig Release: 5/27/2002
Rig Name: NABORS 4 Rig Number: 4ES
.... :~"~!"D:~te"iii'i!'-i: 'i.i~6~"~ii~i~-i i~ ~:~?~'i '"~'~R!i~:;-i'~:0~~I .... !iNPI~!'i Phase ':. ~. Description of Operations
5/24/2002 18:00 - 00:00 6.00 MOB P PRE MI/RU
5/25/2002 00:00 - 04:00 4.00 RIGU P PRE MI/RU & SAFE OUT EQUIPMENT RIG ACCEPT @ 0400
HRS. 5/25/2002
04:00 - 09:00 5.00 KILL P DECOMP CHG OUT DRLG LINE & TAKE ON SEAWATER
09:00- 10:30 1.50 KILL P DECOMP RIG LINES TO TREE & TIGER TANK
10:30- 11:30 1.00 KILL P DECOMP RIG LUBRICATOR & PULL BPV
11:30- 15:30 4.00 KILL P DECOMP KILL WELL WITH 8.5 PPG. SEAWATER & MONITOR SAME
15:30- 16:00 0.50 WHSUR P DECOMP SET TWC
16:00- 17:30 1.50 WHSUR P DECOMP NIPPLE DN TREE
17:30 - 21:00 3.50 BOPSUF P DECOMP NIPPLE UP BOP & CHG OUT BLIND RAMS.
21:00 - 00:00 3.00 BOPSUF; P DECOMP TEST BOP TO 250 LOW & 3500 HIGH (TEST WAIVED BY
CHUCK SHEVE WITH AOGC)
5/26/2002 00:00 - 01:00 1.00 BOPSUF; P DECOMP PULL TWC
01:00 - 02:00 1.00 PULL P DECOMP MU LANDING JT. & PULL HANGER TO FLOOR.
02:00 - 15:00 13.00 PULL P DECOMP POOH WITH ESP COMPLETION & MAKE TWO SPOOL
CHANGES
15:00- 16:00 1.00 PULL P DECOMP LAY DN ESP ASSY.
16:00- 20:00 4.00 RUNCOI~ COMP MU ESP ASSY & CHECK OUT & SERVICE SAME.
20:00 - 00:00 4.00 RUNCOI~ COMP RIH WITH ESP ASSY.
5/27/2002 00:00 - 12:00 12.00 RUNCOI~ COMP RIH WITH ESP COMPLETION TO HANGER
12:00 - 14:30 2.50 RUNCOI~I~ COMP MU HANGER & MAKE EFT CONNECTOR & LAND SAME &
RILDS
14:30 - 16:00 1.50 BOPSUF P COMP SET TWC & NIPPLE DN BOP
16:00- 17:00 1.00 WHSUR P COMP NIPPLE UP TREE.
17:00 - 17:30 0.50 WHSUR P COMP TEST TREE & ADAPTER FLG TO 5000 PSI.
17:30 - 18:00 0.50 WHSUR ~ COMP RIG LUBRICATOR & PULL TWC & SET BPV & RELEASE
RIG @ 1800 HRS. 5/27/2002
RECEIVED
JH Ii) 2002
Printed: 5/28t2002 11:41 '18 AM
SGANNED JUN 2002
THE MATERIAL
UNDER THIS COVER HAS BEEN
MICROFILMED
ON' OR BEFORE
JANUARY 03,2001,
M
P L
A T
W
T H
E IA L U N D E r~
IS M ARK Eh[
C:LO~M.DOC
STATE OF ALASKA
ALASKA O' -\ND GAs CONSERVATION COMF' SION
REPOR i OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [~ Stimulate [~ Plugging [] Perforate
[] Pull Tubing []Alter Casing [] Repair Well []Other
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
4. Location of well at surface
2165' NSL, 2606' WEL, SEC. 6, T13N, R10E
At top of productive interval
907' NSL, 2941' EWL, SEC. 20, T14N, R10E
At effective depth
1105' NSL, 3003' EWL, SEC. 20, T14N, R10E
At total depth
1176' NSL, 3026' EWL, SEC. 20, T14N, R10E
5. Type of well: ~ Development
[~ Exploratory
[~ Stratigraphic
E~ Service
6. Datum Elevation (DF or KB)
KBE = 43.45'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-66A
9. Permit Number / Approval No.
96-162
10. APl Number
50-029-22697-01
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
18823' feet
7792' feet
18718' feet
7718' feet
Length Size
80' 20"
8192' 9-5/8"
Plugs (measured)
Junk (measured)
Cemented
250 sx Arcticset I (Approx.)
1675 sx PF 'E', 700 sx Class 'G'
18771' 7" 250 sx Class 'G'
MD TVD
112' 112'
8223' 4506'
18799' 7775'
Perforation depth' measured
true vertical
18442'-18488'; 18500'-18545'
7486'-7517'; 7526'-7557'
Tubing (size, grade, and measured depth) 2-7/8" 6.5#, L-80 set at 17818'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
See Attachment
Treatment description including volumes used and final pressure
Anchorage
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments
17.
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classifications as:
[~ Oil [] Gas [~] Suspended
Service
I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
KATRINA N. COOPER Title Production Engineer
Prepared By Name/Number:
Date
Michael Williams
Form 10-404 Rev. 06/15/88
Submitln Du
MPF-66A
DESCRIPTION OF WORK COMPLETED
Stimulation Operation
03/13/99
AESP 2000 Stimulation Treatment was performed using the
following fluids:
SUMMARY
A cleanup operation was performed down TBG thru ESP and into formation with
IA fluid packed. Appeared to be very tight during treatment and slickline MIRU to
pull dummy out of top station and set screened orifice (5bbls ESP 2000
displaced)
Fluids Pumped
i,
BBLS. Description
5 ESP 2000 ~
40 Diesel
461 Dead crude
506 Total Pumped
.... STATE OF ALASKA
ALASK/, ,.)IL AND GAS CONSERVATION CO,vrMISSlON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: I~Operation Shutdown I--IStimulate I~jPlugging i-]Perforate
[~ Pull Tubing ~lAIter Casing I--J Repair Well [~ Other Change out ESP
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM
At top of produ, ctive interval
907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM
At effective depth
1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM
At total depth
1176' NSL, 3026' EWL, SEC. 20, T14N, R10E, UM
5. Type of well:
[~ Development
[--I Exploratory
l--I Stratigraphic
[--lService
6. Datum Elevation (DF or KB)
KBE -- 43.45'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-66A
9. Permit Number / Approval No.
96-162
10. APl Number
50-029-22697-01
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
18823 feet
7792 feet
18718 feet
7718 feet
Length Size
80' 20"
8192' 9-5/8"
18771' 7"
Plugs (measured)
Junk (measured)
Cemented
250 sx Arcticset I (Approx.)
1675 sx PF 'E', 700 sx Class 'G'
250 sx Class 'G'
MD TVD
112' 112'
8223' 4506'
18799' 7775'
Perforation depth: measured
true vertical
18442'-18488',18500'-18545'
7526'-7558',7566'-7597'
Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 18085'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORIGINAL
Anchorage
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments E~] Copies of Logs and Surveys run
[~ Daily Report of Well Operations
16. Status of well classifications as:
[~ Oil I--I Gas i--] Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ,,~~ ~
Terrie Hubble Title Technical Assistant III
Prepared By Name/Number:
Date i 0 '(~' C~
Terrie Hubble, 564-4628
Form 10-404 Rev. 06/15/88
Submit In Du
Facility
Date/Time
23 Sep 99
24 Sep 99
M Pt F Pad
Progress Report
Well MPF-66A Page 1
Rig Nabors 4ES Date 06 October 99
02:00-06:00
02:00-06:00
06:00
06:00-11:00
06:00-11:00
11:00
11:00-14:00
11:00-14:00
14:00
14:00-17:00
14:00-17:00
17:00
17:00-22:30
17:00-22:30
22:30
22:30-00:00
22:30-23:00
23:00
23:00-00:00
00:00
00:00-02:00
00:00-02:00
02:00
02:00-04:00
02:00-04:00
04:00
04:00-05:00
04:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00
06:00-08:45
06:00-08:45
08:45
08:45-10:00
08:45-10:00
10:00
10:00-05:00
10:00-19:00
19:00
19:00-21:30
Duration
4hr
4hr
5hr
5hr
3hr
3hr
3hr
3hr
5-1/2 hr
5-1/2 hr
1-1/2 hr
1/2 hr
lhr
2hr
2hr
2hr
2hr
lhr
lhr
lhr
lhr
2-3/4 hr
2-3/4 hr
1-1/4 hr
1-1/4 hr
19hr
9hr
2-1/2 hr
Activity
Move rig
Rig moved 20.00 %
Rig is being moved to MPF-66
Began precautionary measures
Move rig (cont...)
Rig moved 100.00 %
MI/RU & Spot Derrick level & rig Components & safe
out equipment.
At well location - Slot
Derrick management
Rigged up High pressure lines
Take on seawater & set tiger tanks & & install
lines to tree & test same to 2500 psi.
Equipment work completed
Wellhead work
Removed Hanger plug
Remove bpv sicp=500 psi. sitp=0 & hold safety
meeting with anchorage personell
Equipment work completed
Well control
Circulated closed in well at 18240.0 ft
circ. & bull head influx from well bore & monitor
same well on slight vacumn.both sides.
Hole displaced with Seawater- 125.00 % displaced
Wellhead work
Installed Hanger plug
Equipment work completed
Removed Xmas tree
Equipment work completed
Nipple up BOP stack
Installed BOP stack
Equipment work completed
Test well control equipment
Tested BOP stack
Pressure test completed successfully - 3500.000 psi
test witnessed by John crisp with aogc.
Wellhead work
Removed Hanger plug
Equipment work completed
Derrick management
Rigged up Completion string handling equipment
Stopped · To hold safety meeting
crew change.
Fluid system
Circulated at 15000.0 ft
Obtained clean returns - 200.00 % hole volume
Wellhead work
Removed Tubing hanger
Equipment work completed
Pull Single completion, 2-7/8in O.D.
Pulled Tubing in stands to 9248.0 ft
Stopped · To change handling equipment
Serviced Completion string handling equipment
change spool in spooler & rig up additional
.... .' ...... .... .~.'_ ·
,~q"'t, ....... [~, ,.,~, ...... oil.~-~--,.., csp cable.
Facility
Date/Time
25 Sep 99
26 Sep 99
Progress Report
M Pt F Pad
Well MPF-66A Page 2
Rig Nabors 4ES Date 06 October 99
Duration
Activity
21:30
21:30-04:00
04:00
04:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00
06:00-11:00
06:00-11:00
11:00
11:00-06:00
11:00-13:30
13:30
13:30-19:30
19:30
19:30-22:30
22:30
22:30-03:30
03:30
03:30-06:00
06:00
06:00-10:30
06:00-08:00
08:00
08:00-10:30
10:30
10:30-11:30
10:30-11:30
11:30
11:30-13:00
11:30-13:00
13:00
13:00-14:00
13:00-14:00
14:00
14:00-15:00
14:00-15:00
15:00
15:00-06:00
15:00-16:00
16:00
6-1/2 hr
lhr
lhr
lhr
5hr
5hr
19hr
2-1/2 hr
6hr
3hr
5hr
2-1/2 hr
4-1/2 hr
2hr
2-1/2 hr
lhr
lhr
1-1/2 hr
1-1/2 hr
lhr
lhr
lhr
lhr
15hr
lhr
Equipment work completed
Pulled Tubing in stands to 85.0 ft
Stopped: To pick up/lay out tubulars
Rigged down sub-surface equipment - ESP
Work completed, equipment laid out
Slickline wireline work
Rigged up sub-surface equipment - Cleaning / Investigation tools
Equipment work completed
Slickline wireline work (cont...)
Conducted slickline operations on Slickline equipment - Tool run
HES Ran 3.63" Swedge to 18685' & rig dn unit.
Completed run with Cleaning / Investigation tools from 0.0 ft to 1868
Run Single completion, 2-7/8in O.D.
Rigged up sub-surface equipment - ESP
Work completed - ESP in position
Ran Tubing in stands to 7300.0 ft
Stopped: To splice cable
Serviced ESP
make mid-line splice
Equipment work completed
Ran Tubing in stands to 15300.0 ft
Stopped: To splice cable
Serviced ESP
make mid-line splice
Stopped: To hold safety meeting
crew change
Run Single completion, 2-7/8in O.D. (cont...)
Ran Tubing in stands to 18100.0 ft
Completed run with ESP to 18100.0 ft
Serviced ESP
splice esp cable at hanger.
Equipment work completed
Wellhead work
Installed Tubing hanger
Equipment work completed, seal energised
Nipple down BOP stack
Removed BOP stack
Equipment work completed
Wellhead work
Installed Xmas tree
install tree & test same to 5000 psi.
Equipment work completed
Wellhead work
Removed Hanger plug
Remove twc & set bpv.
Equipment work completed : ~ ..
Fluid system
Freeze protect well - 14.000 bbl of Diesel
freeze protect tbg. only.
Completed operations
5.0 fl
MEMORANDUM
TO:
State of Alaska
Alaska Oil and Gas Conservation Commission
_ i
Robert Christensor~/~ DATE: September 24, 1999
Chairman
THRU:
Blair Wondzell, ~~
P. !. Supervisor ?/2'rl~
FROM' John Crisp?~/~ SUBJECT:
Petroleum Irfspector
FILE NO:
bop nabors 4es
9-24-99 jc. doc
BOPE TEST
Nabors 4ES
MPU F-66A
PTD 46-142
September 24,1999: Traveled to BPX's milne point unit to witness BOP test.
Atttached is the AOGCC BOPE test report for reference.
Pressure gauge on accumulator for annular preventer was not operating
properly. The gauge has been replaced. Conducted rig inspection after BOPE
test. Rig & location were in good shape.
SUMMARY: BOPE test witnessed by AOGCC inspector. One failure noted &
repaired.
Attachments' bop nabors 4es 9-24-99 jc.xls
cc;
NON-CONFIDENTIAL
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size: 4 1/2
Test: Initial X
Workover: x
Nabors Rig No. 4ES PTD#
BPX Re p.:
F-66 A Rig Rep.:
Set @ 18,823 Location: Sec.
Weekly Other
i~ TEST:.iDATA
46-142
DATE: 9/24/99
Rig Ph.# 659-4154
Larry Meyers
Gene Sweat
6 T. 13N R. IOE Meridian Umiat
Test Pressures 250 - 3500
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location YES
Standing Order Posted YES
Well Sign YES
Drl. Rig OK
Hazard Sec. YES
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press. P/F
1 250 -250O P
250 - 3500 P
1 250 o 3500 P
I 250 - 3500 P
I 250 - 3500 P
2 250 - 3500 P
1 250 - 3500 P
N/A 250 - 3500
MUD SYSTEM: Visual Alarm
Trip Tank X X
Pit Level Indicators X X
Flow Indicator X X
Meth Gas Detector X X
H2S Gas Detector X X
FLOOR SAFETY VALVES:
Upper Kelly/IBOP
Lower Kelly/IBOP
Ball Type
Inside BOP
Quan.
N/A I
N/A
Test
Pressure
250 - 3500
250 - 3500
250-3500 P
250-3500 P
P/F
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
Test
Pressure P/F
11 250- 3500 P
22 250- 3500 P
Functioned
Functioned
OK
OK
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
4 @ 1700
3,000
1,800
minutes 23 sec.
.
minutes 2 sec.
X Remote: X'
Psig.
:: ': : ~ :: :~ :, : : TESTRESULTSi
Number of Failures: '/ ,Test Time: 4.0 Hours. Number of valves tested 17 Repair or Replacement of Failed
Equipment will be made within I days. Notify the Inspector and follow with Written or Faxed verification to
ttle AOCCC Commission Office at: Fax NO. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: Pressure gauge for annular preventer on koomey failed.
Distribution:
Grig-Well File
c- Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNESS REQUIRED?
YES NO
24 HOUR NOTICE GIVEN
YES NO
Waived By:
Witnessed By:
John Crisp
FI-021L (Rev. 12/94) BOPE NABORS 4ES 9-24-99 JC.xls
PERMIT
96-162
96-162
96-162
96-162
96-162
96-162
96-162
96-162
96-162
96-162
96-162
96-162
AOGCC Individual Well
Geological Materials Inventory
DATA
GR/CCL
PLS
GR/CCL-PERF
GR/CCL-SETT
DGR/RES-MD
DGR/RES-TVD
7954
T DATA PLUS
~/8200-18705
%~200-8519
~18300-18650
~6888-7044
~L~8224-18823
~ s~o~ s~w .~-~~ s~s~.~s-~.~
M~ s~o~ s~w ..~-~ o-~o
·
MWD SRVY ~R~'SPERRY 0-16517.
MWD SRVY ~PERRY 14839.38-16761.
MULTI SHOT 10/10~yRODATA 60-15140.
Page: 1
Date: 11/05/98
RUN RECVD
1 10/23/96
1 10/23/96
1 10/23/96
1 11/06/96
FINAL 03/26/97
FINAL 03/26/97
7 04/16/97
07/28/97
07/28/97
07/28/97
07/28/97
07/28/97
10-407 ~/COMPLETION DATE ~// ~-~//~/
DAILY WELL OPS R ~//~/%,/ TO /l/,,F/q~/,,,,
Are dry ditch samples required? yes ~L~d received?
Was the well cored? yes ~Analysis & description received?
AreWell wellis inteStScompliancerequired?t~es ~ Received?~_y~-~n~-
Initial
COMMENTS
7/.2,¢??/
'?/2?/~' / /
~---~6'
r'! I:~ I/1_ I flJ I~
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs
August 19, 1998
MPF-66A (R), AK-MM-60110
1 LDWG formatted LIS tape with verification listing.
API~: 50-029-22697-01
H.,F.,ASE ACKNOWI.~I}GE i{ECEIPT BY SIGNING AND RE~G THE AIl'ACHED COPIES
Oli' THE TRANSMITFAL LE~ TO THE A~ON OF:
Sperry-Sun Drilling Services
Attn: Ali Turker
5631 Silverado Way, Suite G.
Anchorage, Alaska 99518
RECEIV'ED
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 9951945612
Sign
Note: This Data replaces all previous MWD Digital Data for well (MPF-66A).
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Division of Dresser Industries, Inc.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
[] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing E]Alter Casing [] Repair Well [] Other
Change out ESP
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
99519-6612
4. Location of well at surface
2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM
At top of productive interval
907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM
At effective depth
1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM
At total depth
1176' NSL, 3026' EWL, SEC. 20, T14N, R10E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 43.45'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-66A
9. Permit Number / Approval No.
96-162
10. APl Number
50- 029-22697-01
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
18823 feet
7792 feet
18718 feet
7718 feet
Size
80' 20"
8192' 9-5/8"
Plugs (measured)
Junk (measured)
Cemented
250 sx Arcticset I (Approx.)
1675 sx PF 'E', 700 sx Class 'G'
18771' 7" 250 sx Class 'G'
MD TVD
112' 112'
8223' 4506'
18799' 7775'
Perforation depth:
measured
true vertical
18442'-18488', 18500'-18545'
(Subsea) 7486' - 7517', 7526' - 7557'
Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 17818'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORIGINAL
14.
Representative Dai .ly Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[--~ Copies of Logs and Surveys run [~ Oil I-1 Gas E] Suspended
[] Daily Report of Well Operations
17. I hereby certify that the foregoing is true an/d correct to the best of my knowledge
Title Staff Technical Assistant
Casing Pressure
/,/
Service
Tubing Pressure
Prepared By Name/Number:
Date
Jeanne L. Haas, 564-5225
Facility M Pt F Pad
Progress Report
Well MPF-66
Rig Nabors 5S
Page
Date
1
10 June 98
Date]Time
25 May 98 06:00-06:15
06:15-12:00
12:00-18:00
18:00-18:15
18:15-21:00
21:00-23:00
23:00-01:30
26 May 98 01:30-06:00
06:00-06:15
06:15-08:30
08:30-11:00
11:00-14:00
14:00-14:45
14:45-16:00
16:00-17:00
17:00-18:30
18:30-19:00
19:00-20:00
20:00-20:30
20:30-22:30
22:30-06:00
27 May 98 06:00-18:00
18:00-22:30
22:30-00:00
28 May 98 00:00-00:30
00:30-03:00
03:00-06:00
06:00-09:00
09:00-10:00
10:00-12:30
12:30-14:00
14:00-16:30
16:30-21:30
21:30-23:00
23:00-00:30
29 May 98 00:30-05:30
05:30-06:00
06:00-10:00
10:00-18:00
18:00-20:00
20:00-21:00
21:00-22:00
22:00-06:00
30 May 98 06:00-07:00
07:00-15:00
15:00-18:00
18:00-19:00
19:00-21:00
21:00-23:00
23:00-23:30
23:30-00:30
31 May 98 00:30-02:00
02:00-03:00
03:00-03:30
Duration
1/4 hr
5-3/4 hr
6hr
1/4 hr
2-3/4 hr
2hr
2-1/2 hr
4-1/2 hr
1/4 hr
2-1/4 hr
2-1/2 hr
3hr
3/4 hr
1-1/4 hr
lhr
1-1/2 hr
1/2 hr
lhr
1/2 hr
2hr
7-1/2 hr
12hr
4-1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
3hr
3hr
lhr
2-1/2 hr
1-1/2 hr
2-1/2 hr
5hr
1-1/2 hr
1-1/2 hr
5hr
1/2 hr
4hr
8hr
2hr
lhr
lhr
8hr
lhr
8hr
3hr
lhr
2hr
2hr
1/2 hr
lhr
1-1/2 hr
lhr
1/2 hr
Activity
Held safety meeting
Rig moved 65.00 %
Rig moved 100.00 %
Held safety meeting
Bleed down well
Installed Hanger plug
Removed Xmas tree
Installed BOP stack
Held safety meeting
Installed Tubing retrieval string
Rig waited: Assessed situation
Mixed and pumped 90.000 bbl of treatment
Soak
Displace treatment
Soak
Displace treatment
Soak
Displace treatment
Soak
Rigged up Service lines
Pulled Tubing in stands to 10500.0 ft
Pulled Tubing in stands to 1325.0 ft
Pulled Tubing in stands to 0.0 ft
Ran Tubing in stands to 3350.0 ft
Circulated at 3350.0 ft
Ran Tubing in stands to 8200.0 ft
Circulated at 8200.0 ft
Ran Tubing in stands to 8200.0 ft
Ran Tubing in stands to 11000.0 ft
Circulated at 11000.0 ft
Ran Tubing in stands to 14700.0 ft
Circulated at 14700.0 ft
Singled in drill pipe to 17500.0 ft
Circulated at 17500.0 ft
Singled in drill pipe to 18707.0 ft
Circulated at 18707.0 ft
Laid down 0.0 ft of 3-1/2in OD drill pipe
Laid down 4700.0 ft of 3-1/2in OD drill pipe
Pulled Tubing in stands to 14000.0 ft
Ran Tubing in stands to 0.0 ft
Installed ESP
Ran Tubing in stands to 0.0 ft
Ran Tubing in stands to 8800.0 ft
Ran Tubing in stands to 8800.0 ft
Ran Tubing in stands to 16600.0 ft
Ran Tubing in stands to 16600.0 ft
Ran Tubing in stands to 16600.0 ft
Ran Tubing in stands to 17866.0 ft
Ran Tubing in stands to 17866.0 ft
Installed Tubing hanger
Installed Hanger plug
Removed BOP stack
Installed Manual master valve
Tested Manual master valve
Facility
Date/Time
O1 Jun 98
Progress Report
M Pt F Pad
Well MPF-66
Rig Nabors 5S
Page
Date
03:30-04:00
04:00-06:00
06:00-10:00
10:00-18:00
18:00-21:00
21:00-02:00
02:00-06:00
Duration
1/2 hr
2hr
4hr
8hr
3hr
5hr
4hr
Activity
Removed Hanger plug
Rig moved 0.00 %
Rig moved 0.00 %
Rig moved 0.00 %
Rig moved 0.00 %
Rig moved 100.00 %
Rig moved 100.00 %
2
10 June 98
.... STATE OF ALASKA
ALASKA U,,_ AND GAS CONSERVATION COM,,,,SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: I--1Operation Shutdown [~Stimulate [] Plugging E~] Perforate
[~ Pull Tubing []Alter Casing I--] Repair Well [~ Other Change out ESP
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2165' NSL, 2608' WEL, SEC. 6, T13N, R10E, UM
At top of productive interval
907' NSL, 2941' EWL, SEC. 20, T14N, R10E, UM
At effective depth
1105' NSL, 3003' EWL, SEC. 20, T14N, R10E, UM
At total depth
1176' NSL, 3026' EVVL, SEC. 20, T14N, R10E, UM
J5. Type of well:
[~ Development
[] Exploratory
[] Stratigraphic
[]Service
ORIGINAL
6. Datum Elevation (DF or KB)
KBE = 43.45'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-66A
9. Permit Number / Approval No.
96-162
10. APl Number
50-029-22697-01
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
18823 feet
7792 feet
18718 feet
7718 feet
Length Size
Structural
Conductor 80' 20"
Surface 8192' 9-5/8"
Intermediate
Production 18771' 7"
Liner
Plugs (measured)
Junk (measured)
Cemented MD TVD
250 sx Arcticset I (Approx.) 112' 112'
1675 sx PF 'E', 700 sx Class 'G' 8223' 4506'
250 sx Class 'G' 18799' 7775'
Perforation depth: measured
true vertical
18442'-18488',18500'-18545'
7526'-7558',7566'-7597'
Tubing (size, grade, and measured depth) 2-7/8" 6.5# L-80 set at 18157'
Packers and SSSV (type and measured depth) None
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
15. Attachments
[--I Copies of Logs and Surveys run
[~ Daily Report of Well Operations
16. Status of well classifications as:
[~ Oil I~ Gas I--] Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Chip AIvord ~,'~¢'~ ~ ~-(~-.-'~ Title Senior Drilling Engineer
Prepared By Name/Number:
Date 7('27(?~
Kathy Campoamor, 564-5122
Form 10-404 Rev. 06/15/88
Submit In Duplicate
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: MPF-66A Rig Name: N-4ES AFE: 339049
Accept Date: 06/27/97 Spud Date: - Release Date: 07/05/97
Jun 27 1997
MIRU. Rig accepted 06/27/97 @ 0400 hrs. Check WHP 400 psi. Bleed gas. Install
BPV. Spot tiger tank.
Jun 28 1997
Set & berm tiger tank. WO SW. Attempt to test lines. Re-build valve. Re-test lines at
3000 psi. Good test. Bleed gas. Pump SW down tubing through pump. Call out SWS for
tubing punch gun. Mix 40 bbl LCM pill per well program. RU SWS Request radio
silence. Arm punch. PT lubricator. Start RIH. Pump gun down hole. Unable to get past
9300'. Cont to attempt to get deeper. No-go. POOH. RD SWS. Pump 40 bbl LCM pill &
start displace with SW down annulus.
Jun 29 1997
Spot LCM pill at 18100'. Monitor well. Install TWC. ND tree. NU BOP's. Test BOPE per
AOGCC/SSD policy. Good test. AOGCC waived right to witness test-Chuck Sheve. Pull
TWC. LD test jt. PU landing jt. Pull tubing hanger. Start POOH with 2-7/8" tubing & ESP
assy. Finish POOH with tubing & ESP assy. Inspect & LD ESP assy.
Jun 30 1997
RU slickline. RIH with GR/JB. Set down at 3550'. POOH. Recovered large piece of
rubber. RIH. Set down at 3450'. POOH. Recovered sand, LCM. POOH. RD. MU BHA
#1. Start TIH. Stop at 4050' & reverse tubing volume. Recover LCM. Slip 42' of drlg
line. Cont TlR. Stop at 10000' & rev tubing vol. Recovered LCM. Cont TIH. Tag fill at
18464'. Fill across perfs. RU to circulate. Attempt to rev circ. Packing off. Circ cony @
5bpm/2600psi. Recip pipe. Pump 20 bbl gel sweep & return to surface. Recover LCM.
Attempt to rev circ. Had to circ conv, but was able to wash down to 18489'. Switch to
reverse & clean up hole. Recip pipe while cleaning up. Attempt to make connection.
Pipe stuck. Work stuck pipe. Cont to work pipe. Pump Iow/high vis sweep. Cont to work
pipe. Unable to go down hole or up. 20K-150K. Got pipe to move up hole at 150K. LD 1
jt. Cont pulling, POOH. Got to 18434'. Again pulling at 150K. Tubing parted. Elevators
popped open.Top of fish(TIW valve/HOWCO with half look-up) caught in 7" X 13-5/8"
adp flange below BOP's. Secure well. WO on fishing hand.
Page ]
Jul 1 1997
WO fishing tools. MU FTA #1 - 4-1/8". Short catch. Latch fish & POOH with 13 ea 3-
1/2" jt of DP & a 12' piece of 2-7/8" tubing. MU FTA #2 - 2-7/8" OS. TIH to top of fish at
492' Latch fish. Work fish. Break circ. Swap hole over to EP Mud Lube. POOH. LD 21
jts 3-1/2" DP, fishing tools, & fish #2. POOH. LD 2-7/8" tubing.
Jul 2 1997
Finish LD 2-7/8" tubing. LD DC from derrick. Run test plug. Change to 3-1/2" pipe
rams. Test rams. Good test. Pull test plug. Load pipe shed with 3-1/2" DP. MU mule
shoe. RIH with DP to 3500'. Rev circ with visc'd SW at 6bpm/600 psi. Cont to RIH with
DP to 8000'. Cont RIH with DP. Load pipe shed with DP. Cont to RIH with DP. Cut 84',
slip 42' drlg line. Cont RIH DP to 16900'. Rev circ with visc SW at 4bpm/1450psi. Large
amount of LCM & sand in returns. Plugged flowline. Clear flowline. Cont with rev-out
until clean. Cont RIH with DP.
Jul 3 1997
Cont to RIH to top perforations at 18442'. Rev circ w/visc SW 5bpm/1300psi. Cont RIH
to top of fill at 18641 '. Rev circ & wash fill from 18641' to hard bottom at 18711 '.
Recovered mostly carbolite & LCM. Rev circ. Pump Hi vis sweep and rev to surf.
Monitor well - well static. Start POOH with 3-1/2" DP. Finish POOH with DP & mule
shoe. MU BHA #3. RIH to top of perfs at 18422'. Rev CBU-no solids in returns. Cont
RIH to PBTD at 18711' (csg scraper at 18693'). Rev CBU (saw small amount of
carbolite). POOH to 18698'. Cont to rev circ. Prep for csg wash. Recp pipe.
Jul 4 1997
Rev circ. Mix & pump csg wash per well program. Displace with filtered sea water.
Clean pits. Take on filtered sea water. RU MI filter van. Rev circ well through MI
filtration van. Cont rev circ & filter SW. Samples of returned SW 128.0 NTU. Samples
stay same after 2 complete reversals. Take sample to Baroid lab. Results of lab test
48mg/liter. PE's/centilift on Slope happy. Final results: 128.1 NTU. SW slightly cloudy,
but clean. RD MI filter van. Monitor. Start POOH, LD 3-1/2" DP. Slip drlg line. Cont LD
DP.
Jul 5 1997
Finish LD DP, csg scraper & mill. Change out pipe rams to 2-7/8". Test at 2500psi,
good. Finish loading pipe shed with 2-7/8" tubing. Finish strap/drift remainder of tubing.
MU & service ESP assy. Start RIH with ESP compl. Cont RIH with ESP compl. 224 jts
ran. Stop & change spool. Splice cable. Cont RIH w/ESP compl.
Page 2
Jul 6 1997
Cont RIH w/ESP completion. Stop & change spool. Splice cable. Check cable, ok.
Finish RIH w/ESP compl. MU hanger & landing jt. Splice in upper pig-tail. Check cable,
ok. Land hange. RILDS. Install 2-way check. ND BOP's. NU tree. Test hanger & tree to
5000psi. Good test. Freeze protect tubing & annulus with diesel. Pull 2-way check.
Check ESP cable, ok. Install BPV. Secure wellhead. Rig released 07/05/97 @ 2200
hrs.
Page 3
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR REOOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil ~] Gas ~] Suspended [~ Abandoned I--] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 96-162
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22697-01
4. Location of well at surface ~'~;%~::::~ ~"~ i ~------'"~'~' 9. Unit or Lease Name
2165' NSL, 2608' WEb, SEC. 6, T13N, R10E, UM i .... '"':"-:::;'~-';v i Milne Point Unit
At top of productive interval !~~ ~'i ~ t; 10. Well Number
907' Neb, 2941' EWL, SEC. 20, T14N, R10E, UM '- -,----¢,~-~ ,'Ii¢l~ MPF-66A
At total depth !~ ~/¢: "=' ' ;¢!i'~~~ 11. Field and Pool
1176' NFL, 3026' EWL, SEC. 20, T14N, R10E, UM, %;~---~.---~_.~? Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
KBE = 43.45'I ADb 355016
12. Date Spudded 113. DateT.D. Reached 114. Date Comp., Susp., or Aband.l15. Water depth, ifoffshore 116. Nc. of Completions
9/21/96 9/28/96 11/4/96 N/A MSLI One
17. Total Depth (MD+TVD)18823 7792 FT,I1 8' Plug Back Depth (MD+TVD)I19' Directi°nal Survey J20' Depth where SSSV set 121' Thickness °f Permafr°st18718 7718 FTt [~Yes I--] No N/A MD 1800' (Approx.)
22. Type Electric or Other Logs Run
Gyro, MWD, EMMS
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.1 # H-40 32' 112' 24" 250 sx Arcticset I (Approx.)
9-5/8" 40# L-80 31' 8223' 12-1/4" 1675 sx PF 'E', 700 sx Class 'G'
7" 26# L-80 28' 18799' 8-1/2" 250 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SiZE DEPTH SET (MD) PACKER SET (MD)
3-3/8" Gun Diameter, 6 spf 2-7/8", 6.5#, L-80 18150' N/A
MD TVD MD TVD
18442'-18488' 7526'-7558'
18500'-18545' 7566'-7597' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protect with 75 bbls diesel
Frac 53000# 16/20 Carbolite behind pipe
18442'-1R488'.18500'-1
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
November 24, 1996 t Electric Submersible Pump
Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure ;CALCULATED OIL-BBb GAS-MCF WATER-BBb OIL GRAViTY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas ~v~, ~,~r~ ~c~.~, ~hips.
~nch.o. rsge
Form 10-407 Rev. 07-01-80 Submit In Duplicate
129. 30.
Geologic Markers Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name
Depth Depth recovered and gravity, GOR, and time of each phase.
Top Kuparuk 'A' 18362' 7471'
Top Kuparuk A1 18430' 7518'
TMLV 18520' 7580'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
ChipAIvord .Jj~.,_~.-L,.. ~. ~'¢-~.._ Title Senior Drilling Engineer Date
MPF-66A 96-162 Prepared By Name/Number: Kathy Campoamor, 564-5122
Well Number Permit No. / Approval No.
INSTRUCTIONS
GEUERAk: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM $: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details-of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation' Flowing, Gas Lift, Rod Pump,_~.y~r ~C Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
il~
Form 10-407 Rev. 07-01-80
Facility
Date/Time
19 Aug 96
20 Aug 96
21 Aug 96
22 Aug 96
23 Aug 96
24 Aug 96
25 Aug 96
Progress Report
M Pt F Pad
Well MPF-66PB 1
Rig Nabors 22E
Page 1
Date 18June97
13:00-13:30
13:30-18:00
18:00-18:30
18:30-18:45
18:45-19:00
19:00-06:00
06:00-06:30
06:30-11:30
11:30-18:00
18:00-18:30
18:30-18:45
18:45-00:00
00:00-01:00
01:00-06:00
06:00-06:30
~ 06:30-06:45
06:45-12:00
12:00-16:30
16:30-17:00
17:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-16:00
16:00-17:00
17:00-18:30
18:30-19:30
19:30-19:45
19:45-21:00
21:00-06:00
06:00-06:30
06:30-07:00
07:00-08:00
08:00-09:00
09:00-10:30
10:30-18:00
18:00-19:00
19:00-20:30
20:30-21:30
21:30-06:00
06:00-06:30
06:30-07:00
07:00-11:30
11:30-16:00
16:00-17:00
17:00-18:00
18:00-23:00
23:00-06:00
06:00-06:30
06:30-06:45
06:45-10:30
10:30-12:30
12:30-13:00
13:00-13:30
Duration
1/2 hr
4-1/2 hr
1/2 hr
1/4 hr
1/4 hr
llhr
1/2 hr
5hr
6-1/2 hr
1/2 hr
1/4 hr
5-1/4 hr
lhr
5hr
1/2 hr
1/4 hr
5-1/4 hr
4-1/2 hr
1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2hr
9-1/2 hr
lhr
1-1/2 hr
lhr
1/4 hr
1-1/4 hr
9hr
1/2 hr
1/2hr
lhr
lhr
1-1/2 hr
7-1/2 hr
lhr
1-1/2 hr
lhr
8-1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
4-1/2 hr
lhr
lhr
5hr
7hr
1/2 hr
1/4 hr
3-3/4 hr
2hr
1/2 hr
1/2 hr
Activity
Held safety meeting
Rig moved 30.00 %
Held safety meeting
Held drill (Spill)
Rig moved 50.00 %
Rig waited: Production facilities
Held safety meeting
Rig moved 100.00 %
Rigged up Divertor
Held safety meeting
Held drill (Fire)
Rigged up Top drive
Serviced Block line
Ran Drillpipe to 0.0 ft (5in OD)
Held safety meeting
Held drill (H2S)
Ran Drillpipe to 0.0 ft (5in OD)
Made up BI-IA no. 1
Tested Divertor
Fill pits with Water based mud
Held safety meeting
Drilled to 1350.0 ft
Held safety meeting
Drilled to 2487.0 ft
Circulated at 2487.0 ft
Pulled out of hole to 300.0 ft
Serviced Top drive
Held drill (Kick while tripping)
R.I.H. to 2487.0 ft
Drilled to 3716.0 ft
Held safety meeting
Circulated at 3716.0 ft
Pulled out of hole to 1500.0 ft
Serviced Top drive
R.I.H. to 3716.0 ft
Drilled to 4752.0 ft
Circulated at 4752.0 ft
Pulled out of hole to 1500.0 ft
R.I.H. to 4752.0 ft
Drilled to 5973.0 ft
Held safety meeting
Circulated at 5973.0 ft
Repaired Draw works
Pulled out of hole to 0.0 ft
Serviced Top drive
Made up BHA no. 2
R.I.H. to 5973.0 ft
Drilled to 6721.0 ft
Held safety meeting
Held drill (Spill)
Drilled to 7241.0 ft
Circulated at 7241.0 ft
Pulled out of hole to 5950.0 ft
R.I.H. to 7241.0 ft
Facility
Date/Time
26 Aug 96
27 Aug 96
28 Aug 96
29 Aug 96
30 Aug 96
31 Aug 96
M Pt F Pad
Progress Report
Well MPF-66PB 1
Rig Nabors 22E
Page
Date
Duration
Activity
13:30-04:00
04:00-06:00
06:00-06:30
06:30-07:00
07:00-09:00
09:00-11:00
11:00-14:00
14:00-14:15
14:15-17:00
17:00-19:00
19:00-00:00
00:00-01:30
01:30-02:00
02:00-06:00
06:00-06:30
06:30-11:00
11:00-12:00
12:00-14:00
14:00-17:00
17:00-20:30
20:30-22:00
22:00-00:00
00:00-03:00
03:00-06:00
06:00-06:30
06:30-11:00
11:00-23:00
23:00-01:00
01:00-03:00
03:00-06:00
06:00-06:30
06:30-07:00
07:00-08:30
08:30-09:30
09:30-11:30
11:30-15:30
15:30-16:30
16:30-17:00
17:00-18:00
18:00-20:30
20:30-21:00
21:00-21:30
21:30-21:45
21:45-06:00
06:00-06:30
06:30-11:30
11:30-13:00
14-1/2 hr
2hr
1/2 hr
1/2 hr
2hr
2hr
3hr
1/4 hr
2-3/4 hr
2hr
5hr
1-1/2 hr
1/2 hr
4hr
1/2 hr
4-1/2 hr
lhr
2hr
3hr
3-1/2 hr
1-1/2 hr
2hr
3hr
3hr
1/2 hr
4-1/2 hr
12hr
2hr
2hr
3hr
1/2 hr
1/2 hr
1-1/2 hr
lhr
2hr
4hr
lhr
1/2 hr
lhr
2-1/2 hr
1/2hr
1/2 hr
1/4 hr
8-1/4 hr
1/2 hr
5hr
1-1/2 hr
Drilled to 8250.0 ft
Circulated at 8250.0 ft
Held safety meeting
Circulated at 8250.0 ft
Pulled out of hole to 1100.0 ft
Serviced Block line
R.I.H. to 8250.0 ft
Held drill (Kick while tripping)
Circulated at 8250.0 ft
Pulled out of hole to 1100.0 ft
Pulled BHA
Serviced Casing handling equipment
Held safety meeting
Ran Casing to 2500.0 ft (9-5/8in OD)
Held safety meeting
Ran Casing to 8223.0 ft (9-5/8in OD)
Rigged up Cement head
Circulated at 8223.0 ft
Mixed and pumped slurry - 491.000 bbl
Circulated at 1828.0 ft
Mixed and pumped slurry - 300.000 bbl
Rigged down Casing handling equipment
Rigged down Divertor
Installed Casing spool
Held safety meeting
Rigged up BOP stack
Tested BOP stack
Serviced Bell nipple
Made up BHA no. 3
Repaired Draw works
Held safety meeting
Repaired Draw works
Made up BHA no. 3
R.I.H. to 1828.0 ft
Drilled installed equipment - DV collar
R.I.H. to 8135.0'ft
Circulated at 8135.0 ft
Tested Casing
Circulated at 8135.0 ft
Drilled installed equipment - Landing collar
Circulated at 8270.0 ft
Performed formation integrity test
Held drill (Fire)
Drilled to 9066.0 ft
Held safety meeting
Drilled to 9779.0 ft
Circulated at 9779.0 ft
13:00-18:00
18:00-19:00
19:00-23:00
23:00-06:00
06:00-06:30
06:30-06:45
06:45-22:30
5 hr Pulled out of hole to 0.0 ft
1 hr Made up BHA no. 4
4 hr R.I.H. to 9779.0 ft
7 hr Drilled to 10389.0 ft
1/2 hr Held safety meeting
1/4 hr Held drill (Spill)
15-3/4 hr Drilled to 12363.0 ft
2
18 June 97
Facility
Date/Time
01 Sep 96
02 Sep 96
03 Sep 96
04 Sep 96
05 Sep 96
06 Sep 96
M Pt F Pad
Progress Report
Well MPF-66PB 1
Rig Nabors 22E
Page
Date
Duration
Activity
22:30-00:00
00:00-01:30
01:30-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-15:00
15:00-06:00
06:00-06:30
06:30-12:00
12:00-13:30
13:30-14:30
14:30-14:45
14:45-15:30
15:30-06:00
06:00-06:30
06:30-06:45
06:45-01:45
01:45-02:00
02:00-04:00
04:00-06:00
06:00-06:30
06:30-11:00
11:00-12:30
12:30-12:45
12:45-16:00
16:00-17:00
17:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-10:30
10:30-12:30
12:30-15:30
15:30-16:30
16:30-18:00
18:00-18:30
18:30-20:30
20:30-21:00
21:00-22:00
22:00-00:00
00:00-04:30
04:30-04:45
04:45-05:15
05:15-06:00
06:00-06:30
06:30-18:00
1-1/2 hr
1-1/2 hr
4-1/2 hr
1/2 hr
3-1/2 hr
lhr
4hr
15hr
1/2 hr
5-1/2 hr
1-1/2 hr
lhr
1/4 hr
3/4 hr
14-1/2 hr
1/2 hr
1/4 hr
19hr
1/4 hr
2hr
2hr
1/2 hr
4-1/2 hr
1-1/2 hr
1/4 hr
3-1/4 hr
lhr
lhr
1/2hr
11-1/2 hr
1/2 hr
4hr
2hr
3hr
lhr
1-1/2 hr
1/2 hr
2hr
1/2 hr
lhr
2hr
4-1/2 hr
1/4 hr
1/2 hr
3/4 hr
1/2 hr
11-1/2 hr
Circulated at 12363.0 ft
Pulled out of hole to 8223.0 ft
Repaired Draw works
Held safety meeting
Repaired Draw works
Serviced Block line
R.I.H. to 12363.0 ft
Drilled to 13911.0 ft
Held safety meeting
Drilled to 14446.0 ft
Circulated at 14446.0 ft
Pulled out of hole to 12350.0 ft
Held drill (Kick while tripping)
Ik.I.H. to 14446.0 ft
Drilled to 15512.0 ft
Held safety meeting
Held drill (H2S)
Drilled to 16517.0 ft
Held safety meeting
Circulated at 16517.0 ft
Pulled out of hole to 141450.0 ft
Held safety meeting
Pulled out of hole to 488.0 ft
Pulled BHA
Held safety meeting
Tested BOP stack
Serviced Top drive
Repaired Top drive
Held safety meeting
Repaired Top drive
Held safety meeting
Repaired Top drive
Made up BHA no. 5
R.I.H. to 8220.0 ft
Serviced Block line
Singled in drill pipe to 11250.0 ft
Held safety meeting
R.I.H. to 15901.0 ft
Reamed to 15950.0 ft
R.I.H. to 16519.0 ft
Circulated at 16519.0 ft
Circulated at 16519.0 ft
Flow check
Pulled out of hole to 15950.0 ft
Reamed to 15950.0 ft
Held safety meeting
Jarred stuck pipe at 16099.0 ft
18:00-18:30
18:30-18:45
18:45-19:30
19:30-21:30
21:30-22:00
22:00-22:30
22:30-05:00
1/2 hr
1/4 hr
3/4 hr
2hr
1/2hr
1/2 hr
6-1/2 hr
Held safety meeting
Held drill (Fire)
Worked stuck pipe at 16099.0 ft
Circulated at 16099.0 ft
Pumped out of hole to 15900.0 ft
Held safety meeting
Pulled out of hole to 0.0 ft
3
18 June 97
Facility
Date/Time
07 Sep 96
O8 Sep 96
09 Sep 96
10 Sep 96
11 Sep 96
12 Sep 96
13 Sep 96
Progress Report
M Pt F Pad
Well MPF-66PB 1
Rig Nabors 22E
Page 4
Date 18June97
05:00-06:00
06:00-06:30
06:30-06:45
06:45-09:00
09:00-09:30
09:30-10:30
10:30-11:00
11:00-12:00
12:00-18:00
18:00-18:30
18:30-18:45
18:45-19:00
19:00-21:30
21:30-06:00
06:00-12:00
12:00-18:00
18:00-22:00
22:00-00:30
00:30-06:00
06:00-08:00
08:00-09:00
09:00-11:00
11:00-20:30
20:30-23:30
23:30-00:30
00:30-02:00
02:00-06:00
06:00-06:45
06:45-11:00
11:00-12:00
12:00-13:30
13:30-16:00
16:00-17:00
17:00-19:30
19:30-21:00
21:00-06:00
06:00-09:30
09:30-15:00
15:00-18:30
18:30-00:30
00:30-01:45
01:45-06:00
06:00-06:45
06:45-08:00
08:00-09:30
09:30-10:30
10:30-13:00
13:00-14:00
14:00-17:00
17:00-18:30
18:30-19:30
19:30-06:00
06:00-06:30
06:30-06:45
Duration
lhr
1/2hr
1/4 hr
2-1/4 hr
1/2 hr
lhr
1/2 hr
lhr
6hr
1/2 hr
1/4 hr
1/4 hr
2-1/2 hr
8-1/2 hr
6hr
6hr
4hr
2-1/2 hr
5-1/2 hr
2hr
lhr
2hr
9-1/2 hr
3hr
lhr
1-1/2 hr
4hr
3/4 hr
4-1/4 hr
lhr
1-1/2 hr
2-1/2 hr
lhr
2-1/2 hr
1-1/2 hr
9hr
3-1/2 hr
5-1/2 hr
3-1/2 hr
6hr
1-1/4 hr
4-1/4 hr
3/4 hr
1-1/4 hr
1-1/2 hr
lhr
2-1/2 hr
lhr
3hr
1-1/2 hr
lhr
10-1/2 hr
1/2 hr
1/4 hr
Activity
Made up BHA no. 6
Held safety meeting
Held drill (Spill)
Made up BHA no. 6
R.I.H. to 450.0 ft
Serviced Block line
R.I.H. to 2000.0 ft
Serviced Top drive
R.I.H. to 15000.0 ft
Held safety meeting
Held drill (Kick while tripping)
R.I.H. to 15620.0 ft
Circulated at 15620.0 ft
Jarred stuck pipe at 15638.0 ft
Jarred stuck pipe at 15638.0 ft
Conducted electric cable operations
Conducted electric cable operations
Circulated at 15638.0 ft
Pulled out of hole to 4000.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Made up BHA no. 7
R.I.H. to 15644.0 ft
Circulated at 15644.0 ft
Batch mixed slurry - 68.000 bbl
Pulled out of hole to 13300.0 ft
Circulated at 13300.0 ft
Circulated at 13300.0 ft
Pulled out of hole to 1037.0 ft
Serviced Top drive
Pulled BHA
Made up BHA no. 8
Serviced Top drive pipe handler
R.I.H. to 8223.0 ft
Circulated at 8223.0 ft
R.I.H. to 12500.0 ft
R.I.H. to 14023.0 ft
Reamed to 14929.0 ft
Circulated at 14929.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Worked on BOP - All functions
Serviced Top drive
Made up BHA no. 9
R.I.H. to 2000.0 ft
Serviced Travelling block
R.I.H. to 8200.0 ft
Circulated at 8223.0 ft
R.I.H. to 12699.0 ft
Repaired Block line
Repaired Block line
Repaired Block line
Held safety meeting
Held drill (H2S)
Facility
Date/Time
14 Sep 96
15 Sep 96
16 Sep 96
M Pt F Pad
Progress Report
06:45-10:00
10:00-11:00
11:00-12:00
12:00-15:30
15:30-16:00
16:00-18:00
18:00-18:30
18:30-19:30
19:30-21:00
21:00-00:00
00:00-06:00
06:00-06:30
06:30-06:45
06:45-18:00
18:00-18:30
18:30-18:45
18:45-06:00
06:00-06:30
06:30-08:00
08:00-09:30
09:30-10:00
10:00-10:30
10:30-11:00
11:00-11:15
11:15-18:00
18:00-18:30
18:30-18:45
18:45-06:00
06:00
Duration
3-1/4 hr
lhr
lhr
3-1/2 hr
1/2 hr
2hr
1/2 hr
lhr
1-1/2 hr
3hr
6hr
1/2 hr
1/4 hr
11-1/4 hr
1/2 hr
1/4 hr
11-1/4 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1/2hr
1/2 hr
1/2 hr
1/4 hr
6-3/4 hr
1/2 hr
1/4 hr
11-1/4 hr
Well MPF-66PB 1
Rig Nabors 22E
Activity
Repaired Crown block
Repaired Block line
Circulated at 12699.0 ft
Pulled out of hole to 8200.0 ft
Repaired Crown block
R.I.H. to 11500.0 ft
Held safety meeting
R.I.H. to 14139.0 ft
Reamed to 14929.0 ft
Circulated at 14929.0 ft
Drilled to 15074.0 ft
Held safety meeting
Held drill (Fire)
Drilled to 15436.0 ft
Held safety meeting
Held drill (Kick while drilling)
Drilled to 15911.0 ft
Held safety meeting
Drilled to 16007.0 ft
Circulated at 16007.0 ft
Pulled out of hole to 14500.0 ft
Serviced Top drive
R.I.H. to 16007.0 ft
Held drill (Spill)
Drilled to 16141.0 ft
Held safety meeting
Held drill (Abandonment)
Drilled to 16441.0 ft
Drilled to 16441.0 ft (cont...)
Page
Date
5
18 June 97
Facility
Date/Time
16 Sep 96
17 Sep 96
18 Sep 96
19 Sep 96
20 Sep 96
21 Sep 96
M Pt F Pad
Progress Report
Well MPF-66
Rig Nabors 22E
Page
Date
Duration
Activity
06:00-06:30
06:30-06:45
06:45-18:00
18:00-18:30
18:30-18:45
18:45-22:30
22:30-00:00
00:00-01:00
01:00-06:00
06:00-06:30
06:30-07:00
07:00-09:30
09:30-11:00
11:00-16:00
16:00-18:00
18:00-18:30
18:30-18:45
18:45-00:00
00:00-02:00
02:00-02:30
02:30-06:00
06:00-06:30
06:30-08:00
08:00-09:30
09:30-23:00
23:00-02:00
02:00-04:30
04:30-06:00
06:00-06:30
06:30-10:00
10:00-10:30
10:30-12:30
12:30-16:00
16:00-18:00
18:00-18:15
18:15-21:30
21:30-22:30
22:30-23:00
23:00-00:30
00:30-02:00
02:00-03:30
03:30-04:30
1/2 hr
1/4 hr
11-1/4 hr
1/2 hr
1/4 hr
3-3/4 hr
1-1/2 hr
lhr
5hr
1/2 hr
1/2hr
2-1/2 hr
1-1/2 hr
5hr
2hr
1/2 hr
1/4 hr
5-1/4 hr
2hr
1/2hr
3-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
13-1/2 hr
3hr
2-1/2 hr
1-1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
2hr
3-1/2 hr
2hr
1/4 hr
3-1/4 hr
lhr
1/2 hr
1-1/2 hr
1-1/2 hr
1-1/2 hr
lhr
Held safety meeting
Held drill (H2S)
Drilled to 16669.0 ft
Held safety meeting
Held drill (Fire)
Drilled to 16764.0 ft
Circulated at 16764.0 ft
Pulled out of hole to 16006.0 ft
Jarred stuck pipe at 16176.0 ft
Held safety meeting
Worked stuck pipe at 16350.0 ft
Circulated at 16350.0 ft
Reamed to 16764.0 ft
Circulated at 16764.0 ft
Pulled out of hole to 16100.0 ft
Held safety meeting
Held drill (Spill)
Worked stuck pipe at 16165.0 ft
Circulated at 16165.0 ft
Reamed to 16167.0 ft
Circulated at 16167.0 ft
Held safety meeting
Pumped out of hole to 15900.0 ft
Circulated at 15900.0 ft
Jarred stuck pipe at 15900.0 ft
Fished at 15900.0 ft
Worked stuck pipe at 15900.0 ft
Pumped out of hole to 14000.0 ft
Held safety meeting
Pulled out of hole to 0.0 ft
Removed Wear bushing
Serviced Iron roughneck
Ran Drillpipe in stands to 8223.0 ft
Serviced Block line
Held safety meeting
Ran Drillpipe in stands to 15620.0 ft
Circulated at 15620.0 ft
Mixed and pumped slurry - 36.000 bbl
Pulled Drillpipe in stands to 13740.0 ft
Circulated at 13740.0 ft
Pulled Drillpipe in stands to 8950.0 ft
Circulated at 8950.0 ft
04:30-05:00
05:00-06:00
06:00-06:30
06:30-13:00
13:00-15:00
15:00-16:30
16:30-20:30
20:30-03:00
03:00-04:00
04:00-06:00
06:00-06:30
06:30-11:00
1/2hr
lhr
1/2 hr
6-1/2 hr
2hr
1-1/2 hr
4hr
6-1/2 hr
lhr
2hr
1/2 hr
4-1/2 hr
Mixed and pumped slurry - 56.000 bbl
Pulled Drillpipe in stands to 7100.0 fl
Held safety meeting
Circulated at 7100.0 ft
Pulled Drillpipe in stands to 1082.0 ft
Laid down 1082.0 fl of Drillpipe
Tested BOP stack
Repaired Annular preventor
Rigged up Drillstring handling equipment
Made up BI-IA no. l0
Held safety meeting
R.I.H. to 7945.0 ft
1
18 June 97
Facility M Pt F Pad
Progress Report
Well MPF-66
Rig Nabors 22E
Page
Date
2
18 June 97
Date/Time
11:00-12:00
Duration
lhr
Activity
Drilled cement to 8223.0 ft
Facility
Date/Time
21 Sep 96
22 Sep 96
23 Sep 96
24 Sep 96
25 Sep 96
26 Sep 96
27 Sep 96
28 Sep 96
M Pt F Pad
12:00-19:00
19:00-20:00
20:00-20:15
20:15-06:00
06:00-06:30
06:30-07:00
07:00-08:30
08:30-11:30
11:30-13:00
13:00-14:00
14:00-14:15
14:15-05:30
05:30-06:00
06:00-06:30
06:30-07:45
07:45-08:00
08:00-09:45
09:45-10:00
10:00-11:00
11:00-12:30
12:30-05:45
05:45-06:00
06:00-06:30
06:30-08:00
08:00-09:30
09:30-10:30
10:30-11:30
11:30-06:00
06:00-06:30
06:30-08:00
08:00-09:00
09:00-10:00
10:00-11:00
11:00-05:45
05:45-06:00
06:00-06:30
06:30-07:00
07:00-07:30
07:30-08:00
08:00-08:15
08:15-06:00
06:00-06:30
06:30-11:30
11:30-14:00
14:00-19:30
19:30-22:00
22:00-23:00
23:00-01:30
01:30-02:30
02:30-05:45
05:45-06:00
06:00-06:30
06:30-14:30
14:30-14:45
Duration
7hr
lhr
1/4 hr
9-3/4 hr
1/2 hr
1/2 hr
1-1/2 hr
3hr
1-1/2 hr
lhr
1/4 hr
15-1/4 hr
1/2 hr
1/2 hr
1-1/4 hr
1/4 hr
1-3/4 hr
1/4 hr
lhr
1-1/2 hr
17-1/4 hr
1/4 hr
1/2 hr
1-1/2 hr
1-1/2 hr
lhr
lhr
18-1/2 hr
1/2 hr
1-1/2 hr
lhr
lhr
lhr
18-3/4 hr
1/4 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/4 hr
21-3/4 hr
1/2 hr
5hr
2-1/2 hr
5-1/2 hr
2-1/2 hr
lhr
2-1/2 hr
lhr
3-1/4 hr
1/4 hr
1/2hr
8hr
1/4 hr
Progress Report
Well MPF-66A
Rig Nabors 22E
Page
Date
Activity
Drilled to 9014.0 ft
Repaired Top drive
Held safety meeting
Drilled to 10153.0 ft
Held safety meeting
Drilled to 10247.0 ft
Circulated at 10247.0 ft
Pulled out of hole to 8223.0 ft
Serviced Top drive
R.I.H. to 10247.0 ft
Held drill (Kick while drilling)
Drilled to 11840.0 ft
Circulated at 11840.0 ft
Held safety meeting
Circulated at 11840.0 ft
Held drill (H2S)
Pulled out of hole to 8223.0 ft
Held drill (Kick while tripping)
Serviced Block line
R.I.H. to 11840.0 ft
Drilled to 13369.0 ft
Held drill (Fire)
Held safety meeting
Drilled to 13827.0 ft
Circulated at 13827.0 ft
Pulled out of hole to 11800.0 ft
R.I.H. to 13827.0 ft
Drilled to 15429.0 ft
Held safety meeting
Drilled to 15524.0 ft
Circulated at 15524.0 ft
Pulled out of hole to 13800.0 ft
R.I.H. to 15524.0 ft
Drilled to 16851.0 ft
Held drill (Spill)
Held safety meeting
Circulated at 16681.0 ft
Pulled out of hole to 15550.0 ft
R.I.H. to 16851.0 ft
Held drill (Fire)
Drilled to 17728.0 ft
Held safety meeting
Drilled to 18100.0 ft
Circulated at 18100.0 ft
Pulled out of hole to 8223.0 ft
Serviced Block line
Set Retrievable packer at 45.0 ft with 0.0 psi
Tested BOP stack
Set Retrievable packer at 45.0 ft with 0.0 psi
R.I.H. to 18100.0 ft
Held drill (Kick while tripping)
Held safety meeting
Drilled to 18823.0 ft
Held drill (Spill)
1
18 June 97
Facility
Date/Time
29 Sep 96
30 Sep 96
01 Oct 96
M Pt F Pad
Progress Report
Well MPF-66A
Rig Nabors 22E
Page
Date
Duration
Activity
14:45-17:00
17:00-18:00
18:00-19:30
19:30-21:30
21:30-22:15
22:15-23:00
23:00-01:30
01:30-03:00
03:00-06:00
06:00-06:30
06:30-10:30
10:30-11:30
11:30-13:30
13:30-14:30
14:30-16:00
16:00-06:00
06:00-06:30
06:30-13:00
13:00-16:30
16:30-19:00
19:00-19:30
19:30-21:00
21:00-22:00
22:00-23:00
23:00-02:00
02:00-04:00
04:00-06:00
06:00-06:30
06:30-21:00
21:00-23:00
23:00-23:30
23:30-06:00
2-1/4 hr
lhr
1-1/2 hr
2hr
3/4 hr
3/4 hr
2-1/2 hr
1-1/2 hr
3hr
1/2 hr
4hr
lhr
2hr
lhr
1-1/2 hr
14hr
1/2 hr
6-1/2 hr
3-1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
lhr
lhr
3hr
2hr
2hr
1/2 hr
14-1/2 hr
2hr
1/2 hr
6-1/2 hr
Circulated at 18823.0 ft
Pulled out of hole to 16000.0 ft
R.I.H. to 18823.0 ft
Circulated at 18823.0 ft
Pulled out of hole to 17500.0 ft
R.I.H. to 18823.0 ft
Circulated at 18823.0 ft
Dropped EMMS survey barrel
Pulled out of hole to 10000.0 ft
Held safety meeting
Pulled out of hole to 1100.0 ft
Serviced Block line
Pulled BHA
Serviced Top ram
Rigged up Casing handling equipment
Ran Casing to 12000.0 ft (7in OD)
Held safety meeting
Ran Casing to 18799.0 ft (7in OD)
Circulated at 18799.0 ft
Mixed and pumped slurry - 51.000 bbl
Tested Casing
Serviced Casing handling equipment
Installed Wellhead integral components
Serviced Top ram
Rigged down BOP stack
Rigged up Surface test tree
Tested All tree valves
Held safety meeting
Laid down 15500.0 ft of Drillpipe
Rigged down High pressure lines
Held safety meeting
Rig moved 25.00 %
2
18 June 97
MILNE POINT, ALASKA
TO: Hendrix/Stevens
FROM: Matthew Linder
WELL# IMPU- F66a
Main Category: IDrillin~l
Sub Category: Ilnitial Perforation
lof "A" sands.
Operation Date: ~1 0/1 0/96
MPU
FILE COPY
Date: I10/11/96
Objective: Perforate the Kuparuk "A" sands using Atlas 3-3/8" jumbo jet charges, 6 SPF,60°
phasing. Entrance holes .76', 22 gm, total target penetration 6.4".
Operation: Held onsite safety meeting. Rigged up atlas wireline. Pressure tested lubricator to 300
psi.
REFERENCE LOG: ATLAS WIRELINE GR/CCL MARKED LINE DATED 10/9/96.
Gun run #1, RIH and made tie in pass past RA marker at 18212'. Made +24' depth
correction. Dropped down to 18650' and flagged line. Attempted to Icg entire per[
interval but started pulling weight at 18302' (3700~) stopped logging and dropped
back to flag. Made +1' depth correction. Logged up @ 30 FPM into position, Log off
by 1'. Decided to relog so to get a feel for line stretch and tool drag for upcoming
passes. Dropped back to flag. Made +.5' correction (split the hair). Relog Icg on depth.
Fired per[ gun perforating interval from 18521'-18545'. Lost signal to PFC. No drag
pulling out of hole. All but one charge fired. Well head pressure 440 psi. Trouble shoot
tool sting, found bad swivel. Changed out swivel.
Gun run #2, RIH to flag at 18650'. Logged up at 30 fpm, pulling weight at 18550',
stopped. Dropped back to flag. Made +1' correction and relogged. Log on depth.
Fired perf gun per[orating interval from 18500'-18521'. Logged off. No drag coming
out of hole. All shots fired.
Gun run #3, RIH to flag at 18650'. Logged up at 30 fpm, pulled weight at 18540' but
pulled free. Continued logging. Log on depth. Fired perf gun perforating interval from
18464'-18488'. Lost signal to PFC. POOH. All shots fired. Trouble shoot tool string,
found bad swivel. Changed out swivel.
Gun run #4, RIH to flag at 18650'. Logged up at 30 fpm, smooth run, no drag. Made
+1' correction. Tie in Icg pretty ratty from all the other per[ holes. Gamma rays close but
collars undeterminable. Dropped back and relogged. Will shot off gamma ray. Log on
depth. Fired per[ gun perforating interval at 18442'-18464'. Lost signal to PFC again.
POOH. All shots fired. Trouble shoot tool string, found bad swivel again.
Static survey, Had to switch to 1-11/16" tool string because we are currently out of 3-
3/8" swivels. RIH with the HP to 8519', tools quit falling. Made several attempts at
getting deeper with out luck. Called Bill Hill and decided to take survey at this depth.
After one hour, bottom hole pressure is stable at 2379 psi at 101°.
HP tool # 152902 calibration date of tool 4/14/96
Conclusion: Perforated Kuparuk "A" sands from 18442'-18488' & 18500'-18545'.
Final shut in pressure 550 psi. One perf charge did not fire on gun run
#1.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
TO: S. Rossberg! Bill Hill
FROM: Dan Robertson / Mark O'Malley
DATE: 10123/96
RE: MP F-66 :DATA FRAC AND FRAC
SERVICE CO'S.: DS, Peak,
JOB SUMMARY
MPU
FILE COPY
Pumped 50 bbl injection test at 50 bpm, 4550 psi followed by 300 bbl data
frac as per program. Data transmitted to town real time.
Pumped frac job as per redesign based on data frac analysis. 53 M# of 16/20
carbolite placed behind pipe.
Wellbore left with sand above perfs approx. 93 M#., 10.3 ppg approx, brine
and Diesel 8,000' to surf.. 10 F LCTD for brine.
INJECTIVITY TEST
Design Rate, Bbls Max Rate, Final STP, ISIP, NWB Treat grad,
BPM Pumped bpm psi PSI friction, psi psi/ft
50 50 50 4550 1960 850 0.68
DATA FRAC
Bbls Bbls XL Time XL gel Final STP, ISIP, psi NWB Treat grad,
Pumped gel to on perfs psi friction, psi/ft
Perfs psi
300 282 7.1 4050 2250 850 0.74
FRA C
Sand Lead prop Tail prop Design total Tresaver
pumped, behind behind behind Liner rubber left
Job was M# pipe, M# pipe, M# pipe, M# Sand, M# in hole?
/size /size
Screened I 49 53.2 95.8 N/A
out 16/20 NA
10/29/96
3:13 PM
DATA FRAC & FRAC
SENT VIA MICROSOFT MAIL
TIME I RATEBPM
PsIG IPS GI BBL
CUM
BBL
PUk. .NG SUMMARY
COMMENTS
Ft of Estimated Final ISIP, psi ISlP Incr Pad TSO, TSO,
sand in sand top STP, over fraction design, Nolte
P i p e psi datafrac min P lot
4,040 14,400 6,000 2247 289 N/A N/A
Operational problems
The job was delayed two times because of proximity of 4-ES on F-58. Had some trouble with the link up
between the unit at Milne and the Anch. office. No trouble during the rig up. The job screened out
Comments
Because of the large amount of fmc sand left in the well bore and the depth of the perforations 4-ES will
do the clean out and then run the ESP completion.
DATE/TIME OPERATIONS SUMMARY
1 0~23/96 DATA FRAC
0700 MIRU fmc, vac, pump. Pre job operational and safety meeting. AMBIENT=(-9),
WIND--5 MPH. SIWHP= 370 ,OAP= 350. Pressure test at 6500 psi.
10/23/96 FRAC
PUMP FRAC AS PER REVISED TSO
SECURE WELL. SIWHP= 200. lAP= NA. OAP= 421. RDMO frac, vac, pump.
PUMPING SUMMARY
TIME RATE ANNP WHP STAGE CUM COMMENTS'
BPM PSIG PSIG BBL BBL
DATA FRAC DISPLACEMENT = 706 bbls to top perf
· ·
0/50 350 370 0 Est rate/injection test with seawater
1100 50 500 4550 50/0 50 sd for ISIP=1960 psi, FG=0.68 psi/ft
1104 0/50 350 1600 50/0 Stg 40# XL gel pad
1106 50 530 4140 150
1108 50 550 4200 300/0 350 Stage seawater flush.
1113 50 564 4260 150
:1117 50/40 590 4290 304 654 Reduce rate to 40 bpm (100bbls from perfs)
1119 40 600 4030 1 00 754 pad at perfs
1121 39.4 610 4250 200 854
1124 40.12 604 4100 300 954
1125 40.5 604 4050 384 1038 SD. ISIP= 2250 psi. FG= 0.74 psi/ft. Monitor
pressure.
FRAC
1335 0/40 359 990 0 1038 Stage pad
1340 39.8 478 3798 150
1344 40.3 489 3790 376/0 1414 Stage 1 ppg 16/20 CL
1347 40.3 500 3850 100 1514
1350 40.1 500 3904 231/0 1645 Stage 2 ppg
35/0 1680 3 ppg.
45/O 1725 4 ppg
1354 40 500 3880 53/0 1778 5 ppg, pad on pe~s~aL
59/0 1837 6 ppg
1358 40 470 3go0 63/0 I gOO 7 ppg
66/0 1966 8 ppg
67/0 2033 g ppg ?~c~Orag. r4 ....
1402 40.1 440 3650 69/0 2102 10 ppg, 1 ppg on peds at 2120 cum
PUMPING SUMMARY
TIME RATE ANNP WHP STAGE CUM COMMENTS
BPM PSIG PSIG BBL BBL
1405 40 430 3550 165/0 2275 Stage flush 10.3 ppg NaCIBr with 10 bbls dsl
1409 40 41 8 3927 11 0 2385 3 ppg on perfs
1411 40 403 3853 200 5 ppg on perfs
1414 37 510 4000 305 2579 6 ppg on perfs, screen out at 6000 psi. 53.2
M# behind pipe, 96 M# in pipe. approx 20 bbls
dsl in pdor to screenout.
1415. 2583 Shut down begin to rig down DS
Page 5
FLUIDS PUMPED DOWNHOLE
INJ TEST&
DATA FRAC: 1038 Bbls
FRAC: 1545 Bbls
****TOTAL FLUIDS PUMPED DOWN HOLE LOAD VOLUME
3O
120
150
Diesel to press test and freeze protect
Diesel to gray diesel tank
Total Diesel
IINONE
PETREDAT WINDOW
GEL QUALITY CONTROL CHECK
SEA H20 SEA H20 40# GEL 40# GEL PIPE XL XL
pH TEMP pH VISCOSITY TIME TIME pH
DF/FRAC 7.65 100 7.25 33 17.7 min 2'20 8.7
FLUID ADDITIVES
DS YF140D FLUID SYSTEM with 9.2 gal/ Mgal J877 guar, I gal/ Mgal F-75 surfactant,
0.3 gal/ Mgal M275 bactericide, 5 gal/ Mgal J899 activator
with 40 #/MGAL adomite regain in data frac and pad. No ESL.
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: MPF-66A Rig Name: N-4ES AFE: 347025
Accept Date: 10/25/96 Spud Date: - Release Date: 11/04/96
Oct 26 1996
MIRU. Rig accepted 10/25/96 @ 1100 hrs. Check well for pressure-RBP tested to 2000
psi by production. ND frac tree. NU DSA, NU BOP stack. Change rams. Test BOP, test
all rams, lines & valves. Test Hydril, kelly, upper & lower kelly valve,TIW & IBOP.
Witness of test waived by Chuck Scheve of AOGCC. RD test lines, install wear
bushing. MU Baker RBP retrieving tool. TIH, PU 3-1/2" DP to 2000'. Circ out freeze
protection. Cont TIH picking up 3-1/2" DP.
Oct 27 1996
TIH to 6886' picking up 3-1/2" DP. Circ & balance brine at 10.2 ppg. TIH tag RBP @
6945', pull free with 10K over pull. CBU with brine--no gas or oil. POOH, LD RBP &
retrieving tool. MU 6-1/8" bit, TIH to 6945'. Circ & viscosify brine with Xanvis. TIH, PU
3-1/2" DP to 7946'. CBU. TIH, PU DP to 8040'. PU kelly, wash 8040'-8488', CBU at
8488'. Carbolite returns. TIH, PU DP to 9357'. CBU, small amount of carbolite in
returns. TIH, PU DP to 10355'. CBU, rotate & reciprocate. Carbolite increasing in
returns. Change out swab on mud pump.
Oct 28 1996
Finish changing liner & swab on mud pump. Circ, rotating & reciprocating at 10355'--Iot
of frac sand in returns. Wash & ream 10355' to 11072'. Frac sand decreased in shaker.
TIH, PU DP 11072'-11574'. CBU @ 11574', rotating & reciprocating. TIH, PU DP
11574'-12478'. CBU @ 12478', rotating & reciprocating. TIH, PU DP 12478'-13420'.
CBU @ 13420', rotating & reciprocating until hole clean. TIH, PU DP 13420'-14008'.
Circ @ 14008', rotating & reciprocating. Steady amount of carbolite over shakers.
Page !
Oct 29 1996
Cont circ at 14008'. Swab out on pump, POOH 5 stds. Change out two swab & one liter
on mud pump. TIH to 14008'. Cont circ out sand at 14008'. TIH, PU DP to 14489'. Circ
out sand at 14489', rotate & recip pipe. TIH, PU DP to 15045'. CBU. TIH, PU DP to
15534'. CBU @ 15534', steady amount of sand in shaker. TIH, PU DP to 16289'.
Change shaker screens. CBU @ 16289', rotate & recip. TIH, PU DP to 17052'. Circ out
sand to 17052', rotate & recip. TIH, PU DP to 18030'. Circ out sand at 18030'. TIH, PU
DP. Tag up on firm fill at 18092'. Wash & ream 18092'-18217'. Circ out sand at
18217'.
Oct 3O 1996
Wash & ream 18217' to PBTD. CBU, rotate & recip. Pump high vis sweep around, no
increase in sand returns with sweep. Pump 2nd high vis sweep around, rotate & recip as
much as possible. Engine over heating-no notice of increase in return sand with sweep.
Circ, work pipe while circ. Cannot circ at higher rates & rotate due to engine over
heating. Sand decreasing in shakers. Change shaker screens. Cont circ. Steady
amount of fine sand across screens. Sand content on brine. Fine sand continues to be
circ down hole. RU & rev circ.
Oct 31 1996
Rev circ @ 18706'. Rev 40 bbl Zanvis sweep & 40 bbl dirt magnet & 20 bbl Zanvis
sweep & follow with clean filtered brine. Monitor returns unable to clean brine. Rec pipe
& clean pits. POOH with 3-1/2" DP. Cut drlg line. Cont to POOH. Space out 7" csg
scraper & RIH with same. Slip drlg line. Cont TIH with scraper.
Nov 1 1996
Cont to TIH with BHA #2, tag fill @ 18695'. Rev circ & recip with Baroid unit. Bottoms
up. Loaded up flow line & filter unit with formation sand. Clean flow. Line & cont circ &
filter returns. TOH to top of perfs & clean pits. Surface lines & attempt to begin filtering
fluid, no results. Order new brine system. Take on 9.8 ppg brine & hook up HB&R for
diesel wash. RIH to 18680'. Pump diesel, dirt magnet & csg wash. Repair failes stand
pipe valve. Cont with csg wash sweeps & follow with clean filtered brine to displace
complete system. Filter brine with Baroid filter system. Ram on Baroid filter unit failed
dress & repair same. Cont to filter brine.
Nov 2 1996
Circ & filter brine with Baroid & recip pipe. POOH to 18400' & cont filtering brine & run
Zanvis sweeps. RIH to 18680' & filter brine with Baroid unit & run Zanvis sweeps. Circ
& filter brine until no solids in fluid & NTU down below NTU count. POOH, LD DP.
Page 2
Nov 3 1996
Cont to lay down DP. Clean floor & RU to run ESP compl. Set test plug & clean stack.
Change rams in BOP & test same, pull plug. MU & service ESP assy. RIH with ESP
assy on 2-7/8" tubing.
Nov 4 1996
Cont RIH with ESP completion. Make splice in ESP cable. Cont RIH with ESP compl.
Make splice in ESP cable. Land hanger, RILDS, LD landing jt, set TWC. ND BOP's.
Nov 5 1996
NU adapter flange & tree & test same. Pull TVVC & install BPV & freeze protect well
tubing & annulus. Blow down lines & secure wellhead. Rig released 11/04/96 @ 1000
hrs.
Page
SpE~E~RRY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
BP EXPLORATION (ALASKA),
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INC.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
8183.58 4491.60 4450.10
8228.22 4508.32 4466.82
8288.46 4529.73 4488.23
8384.33 4559.73 4518.23
8478.88 4584.88 4543.38
68 15
67 45
70 36
72 55
76 13
N 21.76 E .00 5486.77N 2213.11E
N 21.44 E 1.30 5525.25N 2228.35E
N 22.40 E 4.98 5577.48N 2249.37E
N 21.40 E 2.61 5661.95N 2283.32E
N 20.95 E 3.52 5746.92N 2316.23E
5914.13
5955.51
6011.79
6102.80
6193.92
8568.09 4606.52 4565.02
8665.61 4631.08 4589.58
8759.17 4654.37 4612.87
8851.60 4677.14 4635.64
8946.45 4701.18 4659.68
75
75
76
75
75
41
7
2
25
12
N 21.04 E .59 5827.72N 2347.24E
N 20.12 E 1.08 5916.07N 2380.41E
N 20.09 E .97 6001.16N 2411.56E
N 19.31 E 1.05 6085.50N 2441.76E
N 20.74 E 1.48 6171.70N 2473.17E
6280.46
6374 . 83
6465.44
6555.01
6646.76
9041.50 4725.92 4684.42
9135.86 4750.59 4709.09
9229.43 4774.62 4733.12
9324.30 4799.42 4757.92
9419.27 4824.33 4782.83
74
75
75
74
75
36
4
9
31
3
N 20.30 E .77 6257.64N 2505.34E
N 20.93 E .81 6342.89N 2537.41E
N 21.82 E .92 6427.10N 2570.37E
N 21.12 E .97 6512.31N 2603.89E
N 21.82 E .90 6597.59N 2637.43E
6738.53
6829.60
6920.02
7011.57
7103.20
9514.33 4848.54 4807.04
9609.12 4872.12 4830.62
9703.84 4895.10 4853.60
9798.00 4918.41 4876.91
9893.14 4942.32 4900.82
75 25
75 45
76 9
75 10
75 41
N 21.83 E .39 6682.93N 2671.60E
N 19.95 E 1.95 6768.69N 2704.33E
N 20.13 E .46 6855.02N 2735.82E
N 19.57 E 1.19 6940.82N 2766.80E
N 20.52 E 1.11 7027.33N 2798.36E
7195.10
7286.89
7378.78
7470.00
7562.08
9986.89 4965.03 4923.53
10080.42 4987.89 4946.39
10171.27 5010.75 4969.25
10262.09 5032.96 4991.46
10355.82 5056.07 5014.57
76 16
75 25
75 25
76 16
75 10
N 19.64 E 1.10 7112.75N 2829
N 18.80 E 1.25 7198.39N 2859
N 18.91 E .12 7281.59N 2887
N 20.00 E 1.49 7364.62N 2917
N 19.46 E 1.29 7450.12N 2947
.59E
.45E
.86E
.19E
86E
7653.03
7743.70
7831.59
7919.64
8010.46
10444.21 5077.87 5036.37
10543.39 5100.74 5059.24
10639.53 5122.72 5081.22
10734.10 5145.31 5103.81
10828.17 5167.91 5126.41
76 15
77 4
76 29
75 51
76 20
N 19.57 E 1.23 7530.85N 2976
N 20.25 E 1.06 7621.59N 3009
N 19.67 E .85 7709.56N 3041
N 19.28 E .78 7796.13N 3071
N 20.86 E 1.71 7881.90N 3103
47E
.33E
28E
.90E
23E
8096.11
8192.61
8286.19
8378.01
8469.32
10922.15 5190.66 5149.16
11018.08 5214.26 5172.76
11112.43 5237.85 5196.35
11206.34 5261.41 5219.91
11300.20 5283.95 5242.45
75 37
75 52
75 9
75 46
76 26
N 20.58 E .82 7967.18N
N 20.67 E .28 8054.20N
N 20.76 E .77 8139.65N
N 20.04 E .99 8224.85N
N 21.42 E 1.59 8310.06N
3135 49E
3168.25E
3200 56E
3232.24E
3264.49E
8560.50
8653.48
8744.83
8835.73
8926.84
ORIGINAL
~RY-SUN DRILLING SERVICES
ANCHOR3~GE ALASKA
PAGE
BP EXPLOR3~TION (ALASKA), INC.
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPER3~TOR: BP EXPLOP~ATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11395.38 5306.89 5265.39 75 39
11490.21 5329.98 5288.48 76 9
11583.26 5352.86 5311.36 75 22
11678.52 5376.71 5335.21 75 37
11770.16 5399.01 5357.51 76 11
N 21.13 E .87 8396.13N 3298.01E
N 21.81 E .87 8481.73N 3331.68E
N 19.97 E 2.10 8565.98N 3363.83E
N 20.48 E .59 8652.51N 3395.72E
N 19.91 E .87 8735.93N 3426.40E
9019.20
9111.16
9201.33
9293.55
9382.44
11860.75 5421.05 5379.55 75 38
11957.28 5444.55 5403.05 76 10
12051.92 5467.15 5425.65 76 10
12145.71 5489.93 5448.43 75 42
12241.55 5514.16 5472.66 75 0
N 19.44 E .80 8818.67N 3455.98E
N 20.37 E 1.09 8906.70N 3487.86E
N 20.22 E .15 8992.89N 3519.73E
N 19.62 E .80 9078.43N 3550.73E
N 19.19 E .86 9165.88N 3581.54E
9470.30
9563.91
9655.81
9746.79
9839.50
12337.61 5538.67 5497.17 75 26
12432.40 5562.44 5520.94 75 30
12528.17 5585.79 5544.29 76 16
12623.12 5608.93 5567.43 75 31
12716.83 5632.29 5590.79 75 35
N 19.71 E .70 9253.46N 3612.47E
N 20.76 E 1.07 9339.56N 3644.20E
N 20.94 E .81 9426.35N 3677.26E
N 20.42 E .95 9512.51N 3709.78E
N 20.06 E .38 9597.65N 3741.18E
9932.37
10024.12
10117.00
10209.08
10299.83
12811.14 5655.34 5613.84 76 6
12906.25 5678.70 5637.20 75 26
13001.54 5702.38 5660.88 75 46
13095.23 5725.98 5684.48 75 2
13190.69 5749.97 5708.47 75 50
N 21.11 E 1.21 9683.26N 3773.33E
N 20.76 E .78 9769.37N 3806.27E
N 21.44 E .77 9855.48N 3839.50E
N 20.49 E 1.26 9940.14N 3871.94E
N 21.06 E 1.02 10026.52N 3904.71E
10391.28
10483.47
10575.76
10666.42
10758.81
13285.18 5772.83 5731.33 76 9
13378.65 5795.75 5754.25 75 26
13474.78 5819.02 5777.52 76 32
13570.43 5841.85 5800.35 75 50
13663.87 5865.33 5823.83 75 3
N 21.71 E .75 10111.89N 3938.14E
N 20.68 E 1.31 10196.37N 3970.90E
N 22.36 E 2.04 10283.13N 4005.12E
N 21.12 E 1.46 10369.40N 4039.52E
N 20.90 E .88 10453.83N 4071.94E
10850.48
10941.08
11034.32
11127.17
11217.61
'13758.74 5889.91 5848.41
13852.12 5914.42 5872.92
13948.30 5939.28 5897.78
14043.03 5962.87 5921.37
14136.68 5985.75 5944.25
74
74
75
75
75
55
39
23
46
56
N 20.85 E .15 10539.44N 4104.60E
N 21.76 E .98 10623.39N 4137.33E
N 21.95 E .79 10709.62N 4171.92E
N 21.37 E .72 10794.89N 4205.78E
N 21.59 E .29 10879.39N 4239.03E
11309.24
11399.33
11492.21
11583.93
11674.73
14231.63 6008.92 5967.42
14324.34 6031.08 5989.58
14418.99 6053.44 6011.94
14513.42 6076.47 6034.97
14605.98 6099.27 6057.77
75 48
76 31
76 9
75 37
75 50
N 20.68 E .94 10965.27N 4272.23E
N 20.48 E .80 11049.55N 4303.88E
N 19.98 E .65 11135.85N 4335.68E
N 19.74 E .61 11221.98N 4366.79E
N 19.58 E .30 11306.45N 4396.97E
11766.80
11856.82
11948.79
12040.36
12130.06
RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
14700.21 6122.12 6080.62
14793.17 6144.87 6103.37
14888.31 6168.13 6126.63
14981.68 6190.95 6149.45
15076.31 6213.79 6172.29
76 5 N 19.82 E .36 11392.52N 4427.79E
75 34 N 19.56 E .61 11477.38N 4458.16E
76 6 N 20.10 E .78 11564.16N 4489.45E
75 35 N 19.89 E .59 11649.24N 4520.41E
76 28 N 21.90 E 2.26 11735.02N 4553.16E
12221.47
12311.60
12403.84
12494.38
12586.19
15170.77 6236.36 6194.86
15265.26 6259.90 6218.40
15359.91 6283.66 6242.16
15454.24 6306.91 6265.41
15549.41 6330.30 6288.80
75 52 N 19.90 E 2.15 11820.69N 4585.88E
75 16 N 18.35 E 1.71 11907.14N 4615.86E
75 39 N 19.81 E 1.55 11993.72N 4645.81E
75 48 N 19.68 E .22 12079.77N 4676.69E
75 44 N 20.28 E .62 12166.46N 4708.21E
12677.89
12769.37
12860.96
12952.37
13044.62
15644.88 6353.67 6312.17
15740.59 6377.49 6335.99
15835.80 6401.68 6360.18
15931.94 6425.70 6384.20
16026.47 6448.99 6407.49
75 55 N 20.80 E .56 12253.14N 4740.69E
75 15 N 20.79 E .70 12339.80N 4773.60E
75 19 N 20.74 E .09 12425.91N 4806.25E
75 44 N 21.28 E .70 12512.81N 4839.62E
75 43 N 20.25 E 1.06 12598.47N 4872.10E
13137.18
13229.88
13321.96
13415.05
13506.66
16122.19 6472.66 6431.16
16217.14 6496.01 6454.51
16310.77 6518.47 6476.97
16404.59 6540.92 6499.42
16498.99 6564.27 6522.77
75 38 N 20.15 E .14 12685.51N 4904.13E
75 53 N 20.75 E .67 12771.74N 4936.28E
76 20 N 21.28 E .74 12856.59N 4968.88E
75 57 N 22.59 E 1.42 12941.09N 5002.90E
75 24 N 20.67 E 2.06 13026.10N 5036.62E
13599.40
13691.44
13782.33
13873.38
13964.81
16593.65 6588.02 6546.52
16687.06 6610.87 6569.37
16783.10 6634.19 6592.69
16873.67 6657.93 6616.43
16970.62 6686.79 6645.29
75 32 N 20.32 E .39 13111.93N 5068.70E
76 8 N 19.97 E .74 13196.96N 5099.89E
75 45 N 19.16 E .91 13284.74N 5131.09E
73 50 N 19.02 E 2.10 13367.33N 5159.67E
71 31 N 17.55 E 2.81 13455.20N 5188.71E
14056.45
14147.02
14240.17
14327.53
14420.01
17064.51 6718.48 6676.98
17159.95 6754.79 6713.29
17251.80 6793.68 6752.18
17346.86 6837.70 6796.20
17442.02 6885.81 6844.31
69 1 N 17.54 E 2.66 13539.45N 5215.35E
66 15 N 17.34 E 2.91 13623.64N 5241.80E
63 39 N 17.33 E 2.83 13703.07N 5266.59E
61 9 N 17.94 E 2.68 13783.33N 5292.10E
58 5 N 16.29 E 3.55 13861.78N 5316.28E
14508.26
14596.39
14679.48
14763.60
14845.55
17534.48 6936.44 6894.94
17630.13 6991.99 6950.49
17722.74 7048.89 7007.39
17817.28 7109.30 7067.80
17911.67 7170.35 7128.85
55 29 N 17.88 E 3.17 13935.72N 5338.99E
53 29 N 18.73 E 2.21 14009.63N 5363.43E
50 40 N 18.88 E 3.04 14078.79N 5386.98E
49 53 N 18.63 E .86 14147.65N 5410.36E
49 30 N 18.46 E .44 14215.89N 5433.26E
14922.78
15000.57
15073.59
15146.29
15218.23
.RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/10
TOTAL
RECTANGULAR COORDINATES
0 NORTH/SOUTH EAST/WEST
VERT.
SECT.
18007.47 7232.96 7191
18100.65 7294.81 7253
18194.94 7358.12 7316
18287.26 7420.52 7379
18380.87 7484.35 7442
.46
.31
.62
.02
.85
48 52 N 17.56 E .96 14284.85N 5455.68E
47 57 N 17.32 E 1.02 14351.34N 5476.56E
47 41 N 17.54 E .33 14418.00N 5497.49E
47 15 N 17.14 E .56 14482.95N 5517.77E
46 45 N 17.15 E .54 14548.37N 5537.96E
15290.67
15360.27
15430.05
15497.99
15566.34
18475.14 7549.10 7507
18568.63 7613.67 7572
18661.65 7678.40 7636
18754.03 7743.39 7701
18823.00 7792.22 7750
.60
.17
.90
.89
.72
46 29 N 17.64 E .47 14613.75N
46 9 N 17.68 E .37 14678.18N
45 39 N 17.36 E .58 14741.88N
44 55 N 17.73 E .85 14804.48N
44 55 N 17.73 E .00 14850.87N
5558.44E 15634.76
5578.95E 15702.30
5599.06E 15769.02
5618.85E 15834.58
5633.68E 15883.23
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 15883.54 FEET
AT NORTH 20 DEG. 46 MIN. EAST AT MD = 18823
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 20.42 DEG.
TIE-IN SURVEY AT 8,183.58' MD
WINDOW POINT AT 8,228.22' MD
PROJECTED SURVEY AT 18,823.00' MD
~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8183.58 4491.60 4450.10 5486.77 N 2213.11 E
9183.58 4762.88 4721.38 6385.95 N 2553.90 E
10183.58 5013.85 4972.35 7292.86 N 2891.72 E
11183.58 5255.82 5214.32 8204.12 N 3224.68 E
12183.58 5499.28 5457.78 9113.00 N 3563.06 E
3691.98
4420.70 728.72
5169.73 749.03
5927.76 758.03
6684.30 756.54
13183.58 5748.23 5706.73 10020.09 N 3902.24 E
14183.58 5997.15 5955.65 10921.69 N 4255.77 E
15183.58 6239.48 6197.98 11832.38 N 4590.11 E
16183.58 6487.83 6446.33 12741.31 N 4924.75 E
17183.58 6764.43 6722.93 13644.23 N 5248.23 E
7435.35 751.04
8186.43 751.09
8944.10 757.66
9695.75 751.66
10419.15 723.39
18183.58 7350.47 7308.97 14409.99 N 5494.96 E
18823.00 7792.22 7750.72 14850.87 N 5633.68 E
10833.11 413.96
11030.78 197.67
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
.{RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 092896
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8183.58 4491.60 4450.10 5486.77 N 2213.11 E 3691.98
8323.92 4541.50 4500.00 5608.41 N 2262.11 E 3782.42 90.44
8706.32 4641.50 4600.00 5953.02 N 2393.95 E 4064.82 282.40
9100.57 4741.50 4700.00 6311.03 N 2525.24 E 4359.07 294.25
9486.34 4841.50 4800.00 6657.78 N 2661.53 E 4644.84 285.77
9889.81 4941.50 4900.00 7024.31 N 2797.23 E 4948.31 303.47
10298.06 5041.50 5000.00 7397.46 N 2929.14 E 5256.56 308.25
10718.48 5141.50 5100.00 7781.84 N 3066.90 E 5576.98 320.42
11126.67 5241.50 5200.00 8152.52 N 3205.44 E 5885.17 308.19
11538.11 5341.50 5300.00 8524.94 N 3348.80 E 6196.61 311.44
11944.53 5441.50 5400.00 8895.09 N 3483.55 E 6503.03 306.42
12348.88 5541.50 5500.00 9263.74 N 3616.15 E 6807.38 304.36
12753.85 5641.50 5600.00 9631.33 N 3753.48 E 7112.35 304.97
13156.05 5741.50 5700.00 9995.18 N 3892.64 E 7414.55 302.20
13569.00 5841.50 5800.00 10368.11 N 4039.02 E 7727.50 312.96
13957.11 5941.50 5900.00 10717.53 N 4175.11 E 8015.61 288.11
14368.96 6041.50 6000.00 11090.21 N 4319.03 E 8327.46 311.85
14779.65 6141.50 6100.00 11465.05 N 4453.77 E 8638.15 310.69
15191.85 6241.50 6200.00 11839.92 N 4592.84 E 8950.35 312.20
15594.94 6341.50 6300.00 12207.85 N 4723.54 E 9253.44 303.09
15996.07 6441.50 6400.00 12570.83 N 4861.90 E 9554.57 301.13
16406.99 6541.50 6500.00 12943.23 N 5003.80 E 9865.49 310.92
16812.79 6641.50 6600.00 13311.93 N 5140.53 E 10171.29 305.81
17126.27 6741.50 6700.00 13594.10 N 5232.56 E 10384.77 213.48
17354.66 6841.50 6800.00 13789.82 N 5294.18 E 10513.16 128.39
17543.41 6941.50 6900.00 13942.73 N 5341.25 E 10601.91 88.75
17711.00 7041.50 7000.00 14070.17 N 5384.03 E 10669.50 67.59
17867.24 7141.50 7100.00 14183.85 N 5422.55 E 10725.74 56.23
18020.45 7241.50 7200.00 14294.17 N 5458.63 E 10778.95 53.21
18170.25 7341.50 7300.00 14400.59 N 5491.99 E 10828.75 49.80
18318.18 7441.50 7400.00 14504.65 N 5524.46 E 10876.68 47.93
18464.10 7541.50 7500.00 14606.12 N 5556.01 E 10922.60 45.92
18608.79 7641.50 7600.00 14705.76 N 5587.73 E 10967.29 44.69
18751.37 7741.50 7700.00 14802.69 N 5618.28 E 11009.87 42.58
18783
· 58 7764.31 7722.81 14824.36 N 5625.21 E 11019.27 9.40
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWE THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
-'
S. tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 090496
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
14839.38 6782.17 6740.67 70 23 N 22.60 E .00 11294.33N 4517.15E 12103.82
14891.07 6799.51 6758.01 70 25 N 23.32 E 1.31 11339.17N 4536.15E 12152.16
14983.88 6829.97 6788.47 71 15 N 21.38 E 2.17 11420.24N 4569.47E 12239.30
15079.04 6860.90 6819.40 70 48 N 18.74 E 2.67 11504.75N 4600.34E 12329.05
15174.32 6892.96 6851.46 69 52 N 17.07 E 1.92 11590.11N 4627.92E 12418.71
15267.63 6925.36 6883.86 69 30 N 16.27 E .90 11673.94N 4653.02E 12506.21
15362.26 6958.07 6916.57 70 3 N 16.42 E .60 11759.14N 4678.01E 12595.00
15457.45 6992.40 6950.90 67 39 N 16.38 E 2.51 11844.29N 4703.07E 12683.76
15552.65 7028.91 6987.41 67 14 N 16.68 E .53 11928.58N 4728.09E 12771.68
15647.38 7065.61 7024.11 67 11 N 20.75 E 3.96 12011.28N 4756.10E 12858.90
15741.94 7101.94 7060.44 67 37 N 18.99 E 1.78 12093.37N 4785.77E 12946.01
15837.31 7138.33 7096.83 67 30 N 17.79 E 1.17 12177.02N 4813.58E 13034.08
15930.31 7172.93 7131.43 68 48 N 19.50 E 2.21 12258.79N 4841.18E 13120.31
16025.95 7205.96 7164.46 70 47 N 21.77 E 3.04 12342.78N 4872.82E 13209.77
16120.42 7235.70 7194.20 72 30 N 22.26 E 1.88 12425.89N 4906.42E 13298.94
16217.88 7263.63 7222.13 74 11 N 23.62 E 2.19 12511.86N 4942.81E 13391.63
16312.35 7286.93 7245.43 77 15 N 24.65 E 3.41 12595.40N 4980.25E 13482.27
16405.26 7305.04 7263.54 80 16 N 22.47 E 3.98 12678.92N 5016.66E 13572.61
16502.04 7320.86 7279.36 80 54 N 21.31 E 1.35 12767.51N 5052.25E 13667.59
16596.67 7335.40 7293.90 81 25 N 19.02 E 2.45 12855.27N 5084.48E 13760.84
16692.04 7349.67 7308.17 81 22 N 16.59 E 2.52 12945.02N 5113.31E 13855.07
16761.00 7360.02 7318.52 81 22 N 16.59 E .00 13010.37N 5132.77E 13923.25
THE CALCULATION PROCEDURES
THREE-DIMENSION MINIMUM
HORIZONTAL DISPLACEMENT
AT NORTH 21 DEG. 31 MIN.
ARE BASED ON THE USE OF
CURVATURE METHOD.
= 13986.24 FEET
EAST AT MD = 16761
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 16.09 DEG.
TIE-IN SURVEY AT 14,839.00' MD
OPEN-HOLE SIDE TRACK
PROJECTED SURVEY AT 16,761.00' MD
XRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 090496
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPER3~TOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
14839.38 6782.17 6740.67 11294.33 N 4517.15 E 8057.21
15839.38 7139.13 7097.63 12178.84 N 4814.16 E 8700.25 643.04
16761.00 7360.02 7318.52 13010.37 N 5132.77 E 9400.98 700.73
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
Si XRY-SLrN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 12/ 4/96
DATE OF SURVEY: 090496
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
14839.38 6782.17 6740.67 11294.33 N 4517.15 E 8057.21
15019.78 6841.50 6800.00 11451.89 N 4581.86 E 8178.28
15313.81 6941.50 6900.00 11715.47 N 4665.15 E 8372.3I
15585.17 7041.50 7000.00 11957.19 N 4737.07 E 8543.67
121.07
194.03
171.37
15845.58 7141.50 7100.00 12184.30 N 4815.91 E 8704.08
16139.70 7241.50 7200.00 12442.91 N 4913.39 E 8898.20
16637.56 7341.50 7300.00 12893.49 N 5097.66 E 9296.06
16659.38 7344.77 7303.27 12914.08 N 5104.08 E 9314.61
160.41
194.12
397.86
18.55
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
S tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -41.50
173.50 173.50 132.00
226.35 226.34 184.84
259.13 259.12 217.62
350.07 350.05 308.55
0 0
0 33
0 28
0 45
1 12
N .00 E .00 .00N .00E
S 60.60 E .32 .41S .73E
S 43.84 E .32 .69S 1.10E
S 62.72 E 1.04 .88S 1.38E
S 85.38 E .64 1.23S 2.86E
.00
-.19
-.36
- .47
-.39
440.40 440.34 398.84
530.82 530.70 489.20
621.59 621.33 579.83
712 . 63 712 . 08 670 . 58
803 . 84 802 . 75 761 . 25
1 52
2 30
3 42
5 18
7 2
N 88.22 E .76 1.26S 5.27E .25
N 82.40 E .74 .96S 8.70E 1.49
N 72.20 E 1.46 .20N 13.46E 3.92
N 58.30 E 2.12 3.32N 19.85E 8.69
N 52.38 E 2.02 8.95N 27.87E 16.32
894.26 892.22 850.72
987.20 983.52 942.02
1082.80 1076.77 1035.27
1177.16 1168.32 1126.82
1273.22 1261.04 1219.54
9 30 N 42.70 E 3.13 17.82N 37.33E
11 56 N 42.98 E 2.63 30.50N 49.09E
13 28 N 42.78 E 1.60 45.92N 63.41E
14 30 N 42.00 E 1.10 62.77N 78.78E
15 48 N 40.48 E 1.43 81.66N 95.32E
27.47
42.91
61.69
82.15
104.88
1367.52 1351.30 1309.80
1463.61 1441.96 1400.46
1558.24 1530.14 1488.64
1652.97 1618.19 1576.69
1746.74 1705.13 1663.63
17 46
20 53
21 40
21 37
22 23
N 36.43 E 2.43 103.02N 112.21E
N 32.11 E 3.56 129.34N 130.04E
N 26.66 E 2.25 159.24N 146.84E
N 26.84 E .09 190.45N 162.57E
N 25.56 E .97 221.97N 178.08E
130.08
160.31
193.70
228.04
262.63
1841.51 1792.00 1750.50
1937.01 1877.80 1836.30
2032.14 1960.93 1919.43
2125.53 2039.76 1998.26
2221.45 2117.63 2076.13
24 43
27 21
30 47
34 2
37 22
N 21.12 E 3.09 256.75N 193.01E
N 20.81 E 2.77 295.89N 208.00E
N 20.11 E 3.62 339.20N 224.14E
N 18.48 E 3.60 386.45N 240.65E
N 18.74 E 3.49 439.50N 258.52E
300.18
341.95
388.04
438.01
493.94
2315.67 2191.16 2149.66
2410.88 2262.90 2221.40
2506.03 2331.92 2290.42
2600.68 2396.93 2355.43
2695.70 2458.23 2416.73
40
42
44
48
51
1
9
50
22
15
N 18.80 E 2.81 495.28N 277.48E
N 19.18 E 2.24 554.44N 297.84E
N 20.80 E 3.07 615.97N 320.25E
N 20.97 E 3.72 680.22N 344.77E
N 20.64 E 3.05 748.08N 370.54E
552.78
615.27
680.60
749.13
821.47
2791.72 2516.51 2475.01
2885.87 2570.64 2529.14
2979.53 2621.42 2579.92
3074.91 2669.67 2628.17
3169.79 2715.00 2673.50
53 59
55 48
58 31
60 40
62 15
N 20.07 E 2.88 819.61N 397.08E
N 20.71 E 2.01 891.80N 423.92E
N 20.50 E 2.91 965.46N 451.61E
N 20.65 E 2.25 1042.47N 480.51E
N 20.55 E 1.67 1120.48N 509.84E
897.56
974.36
1052.81
1134.81
1217.89
ORIGii JAL
S~ .tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATE
DEGREES DG/100 NORTH/SOUTH EAST/WEST
S VERT.
SECT.
3263.33 2757.83 2716.33
3357.68 2798.32 2756.82
3451.84 2834.71 2793.21
3546.94 2868.18 2826.68
3640.44 2900.11 2858.61
63 15 N 21.00 E 1.15 1198.23N 539.33E
65 55 N 21.10 E 2.83 1277.76N 569.94E
68 35 N 20.68 E 2.88 1358.88N 600.90E
70 11 N 19.31 E 2.15 1442.52N 631.33E
69 52 N 19.68 E .51 1525.36N 660.65E
1300.77
1385.66
1472.19
1560.98
1648.71
3732.31 2932.26 2890.76
3826.05 2964.71 2923.21
3921.90 2997.26 2955.76
4016.95 3030.36 2988.86
4111.29 3064.86 3023.36
69 9 N 19.86 E .79 1606.35N 689.76E
70 19 N 20.20 E 1.29 1688.96N 719.88E
69 57 N 20.22 E .39 1773.57N 751.03E
69 16 N 20.28 E .72 1857.16N 781.87E
67 49 N 20.78 E 1.62 1939.38N 812.66E
1734.59
1822.32
1912.24
2001.10
2088.63
4203.83 3098.77 3057.27
4298.10 3132.86 3091.36
4393.44 3167.30 3125.80
4489.51 3201.24 3159.74
4577.30 3232.18 3190.68
69 10 N 21.35 E 1.58 2019.72N 843.60E
68 25 N 21.08 E .85 2101.65N 875.41E
69 13 N 21.22 E .86 2184.56N 907.48E
69 23 N 20.69 E .54 2268.49N 939.62E
69 20 N 21.50 E .87 2345.14N 969.19E
2174.40
2261.94
2350.49
2440.04
2521.89
4670.22 3264.88 3223.38
4769.53 3299.63 3258.13
4863.78 3332.45 3290.95
4957.07 3364.57 3323.07
5052.95 3397.04 3355.54
69 27 N 21.28 E .26 2426.13N 1000.92E
69 34 N 21.13 E .18 2512.86N 1034.56E
69 40 N 21.24 E .15 2595.24N 1066.49E
70 3 N 20.51 E .85 2677.08N 1097.70E
70 20 N 21.32 E .85 2761.34N 1129.91E
2608.49
2701.15
2789.15
2876.43
2966.32
5148.40 3428.92 3387.42
5240.12 3459.58 3418.08
5332.59 3490.81 3449.31
5426.55 3522.88 3481.38
5521.08 3555.18 3513.68
70 38 N 21.07 E .40 2845.23N 1162.43E
70 18 N 20.43 E .75 2926.06N 1193.06E
70 12 N 19.64 E .81 3007.83N 1222.88~
69 52 N 22.83 E 3.21 3090.14N 1254.86E
70 9 N 21.78 E 1.08 3172.33N 1288.57E
3055.94
3142.09
3228.92
3316.87
3405.18
5615.32 3587.24 3545.74
5707.04 3618.71 3577.21
5801.25 3651.09 3609.59
5895.83 3683.17 3641.67
5936.87 3696.93 3655.43
70 4 N 21.81 E .10 3254.61N 1321.48E
69 47 N 21.63 E .36 3334.65N 1353.36E
70 0 N 21.26 E .44 3416.99N 1385.71E
70 19 N 21.42 E .37 3499.87N 1418.08E
70 30 N 22.19 E 1.82 3535.76N 1432.44E
3493.37
3579.10
3667.19
3755.78
3794.26
6034.60 3729.74 3688.24
6128.62 3761.47 3719.97
6224.41 3794.09 3752.59
6321.06 3827.65 3786.15
6413.78 3861.36 3819.86
70 15 N 22.50 E .39 3620.91N 1467.44E
70 18 N 22.44 E .07 3702.69N 1501.27E
69 52 N 21.56 E .97 3786.20N 1535.01E
69 28 N 21.33 E .47 3870.56N 1568.14E
67 52 N 21.29 E 1.73 3951.02N 1599.53E
3885.76
3973.72
4063.30
4153.54
4239.55
~.RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6510.06 3896.53 3855.03
6605.05 3930.50 3889.00
6700.88 3964.85 3923.35
6787.54 3995.99 3954.49
6885.05 4030.21 3988.71
69 16 N 21.20 E 1.45 4034.55N 1632.01E
68 49 N 20.92 E .55 4117.33N 1663.88E
69 10 N 22.22 E 1.32 4200.52N 1696.77E
68 42 N 22.00 E .58 4275.44N 1727.21E
70 11 N 21.80 E 1.54 4360.15N 1761.26E
4328.81
4417.18
4506.23
4586.65
4677.48
6976.46 4061.43 4019.93
7075.86 4095.77 4054.27
7169.70 4128.22 4086.72
7260.08 4159.63 4118.13
7356.25 4193.44 4151.94
69 51 N 21.83 E .37 4439.92N 1793.19E
69 42 N 21.83 E .15 4526.50N 1827.87E
69 49 N 21.98 E .20 4608.20N 1860.72E
69 30 N 22.21 E .44 4686.72N 1892.60E
69 19 N 21.41 E .80 4770.30N 1926.05E
4762.97
4855.78
4943.38
5027.66
5117.24
7452.06 4227.82 4186.32
7546.52 4261.74 4220.24
7641.66 4295.40 4253.90
7734.81 4328.92 4287.42
7829.28 4363.03 4321.53
68 36 N 21.50 E .76 4853.53N 1958.76E
69 18 N 22.08 E .94 4935.40N 1991.48E
69 14 N 21.60 E .48 5017.99N 2024.59E
68 34 N 20.47 E 1.34 5099.10N 2055.78E
69 5 N 21.76 E 1.38 5181.28N 2087.52E
5206.27
5294.00
5382.53
5469.11
5556.87
7924.14 4397.53 4356.03
8016.51 4431.16 4389.66
8112.38 4465.51 4424.01
8183.58 4491.47 4449.97
8228.22 4508.19 4466.69
68 15 N 21.71 E .88 5263.36N 2120.24E
69 1 N 23.46 E 1.95 5342.78N 2153.28E
68 58 N 22.39 E 1.04 5425.21N 2188.14E
68 15 N 21.76 E 1.32 5486.65N 2213.06E
67 45 N 21.44 E 1.30 5525.13N 2228.29E
5644.80
5730.26
5819.13
5885.06
5926.26
8325.06 4543.79 4502.29
8418.05 4577.02 4535.52
8513.69 4610.49 4568.99
8608.63 4642.86 4601.36
8703.67 4675.60 4634.10
69 7 N 21.66 E 1.43 5608.89N 2261.37E
69 0 N 21.56 E .16 5689.63N 2293.36E
70 1 N 21.32 E 1.10 5773.02N 2326.10E
70 5 N 20.48 E .84 5856.40N 2357.94E
69 35 N 19.82 E .84 5940.16N 2388.68E
6015.91
6102.35
6191.55
6280.48
6369.48
8798.37 4707.98 4666.48
8894.97 4740.41 4698.91
8989.79 4772.81 4731.31
9084.91 4805.67 4764.17
9180.46 4838.56 4797.06
70 24 N 20.71 E 1.23 6023.64N 2419.50E
70 21 N 20.57 E .15 6108.79N 2451.58E
69 40 N 19.98 E .93 6192.38N 2482.46E
69 54 N 20.61 E .66 6276.10N 2513.42E
69 49 N 20.46 E .16 6360.11N 2544.89E
6458.23
6548.94
6637.81
6726.83
6816.27
9273.00 4870.34 4828.84
9368.10 4902.96 4861.46
9462.98 4935.80 4894.30
9558.33 4969.26 4927.76
9650.46 5001.35 4959.85
70 0 N 20.85 E .44 6441.43N 2575.54E
69 52 N 20.22 E .64 6525.09N 2606.88E
69 36 N 21.40 E 1.20 6608.29N 2638.50E
69 18 N 21.10 E .43 6691.50N 2670.86E
69 55 N 21.31 E .70 6772.02N 2702.10E
6902.91
6991.97
7080.68
7169.60
7255.62
.tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES .DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9745.06 5033.23 4991.73
9839.22 5064.40 5022.90
9933.55 5095.36 5053.86
10028.16 5125.86 5084.36
10124.02 5156.19 5114.69
70 41
70 38
71 2
71 20
71 45
N 24.70 E 3.47 6853.98N 2736.91E
N 23.89 E .81 6934.96N 2773.46E
N 23.14 E .86 7016.67N 2809.01E
N 22.32 E .88 7099.27N 2843.62E
N 22.82 E .65 7183.24N 2878.52E
7344.02
7431.96
7520.32
7609.27
7699.62
10216.52 5184.70 5143.20
10310.44 5213.91 5172.41
10404.55 5243.60 5202.10
10499.51 5273.69 5232.19
10590.67 5303.85 5262.35
72 20
71 24
71 48
71 14
70 7
N 22.45 E .75 7264.45N 2912.38E
N 22.18 E 1.04 7347.03N 2946.27E
N 22.09 E .43 7429.75N 2979.92E
N 21.55 E .81 7513.36N 3013.40E
N 21.31 E 1.25 7593.44N 3044.83E
7787.04
7875.78
7964.58
8054.20
8139.85
10688.05 5336.67 5295.17
10781.69 5368.46 5326.96
10876.11 5401.76 5360.26
10971.74 5436.25 5394.75
11062.78 5468.87 5427.37
70
69
68
68
69
29
48
53
49
10
N 21.46 E .41 7678.81N 3078.26E
N 21.40 E .73 7760.79N 3110.44E
N 22.10 E 1.20 7842.85N 3143.18E
N 21.65 E .44 7925.62N 3176.41E
N 21.61 E .39 8004.63N 3207.74E
8231.14
8318.83
8406.75
8495.49
8580.09
11158.44 5502.55 5461.05
11253.43 5535.89 5494.39
11349.04 5569.60 5528.10
11441.87 5601.98 5560.48
11535.18 5634.03 5592.53
69 35
69 18
69 24
69 46
70 3
N 20.99 E .74 8088.05N 3240.26E
N 21.65 E .71 8170.91N 3272.60E
N 21.70 ~ .11 8254.05N 3305.64E
N 21.70 E .40 8334.89N 3337.81E
N 20.91 E .85 8416.53N 3369.65E
8669.25
8757.82
8846.87
8933.45
9020.72
11627.52 5666.11 5624.61
11723.16 5699.85 5658.35
11817.59 5732.73 5691.23
11910.86 5764.66 5723.16
12002.08 5795.89 5754.39
69 17
69 24
69 50
70 7
69 50
N 21.92 E 1.32 8497.13N 3401.26E
N 22.25 E .34 8580.06N 3434.91E
N 21.63 E .77 8662.17N 3467.98E
N 21.31 E .44 8743.72N 3500.06E
N 22.87 E 1.64 8823.13N 3532.28E
9106.93
9195.93
9283.99
9371.24
9456.47
12096.98 5828.34 5786.84
12190.42 5860.52 5819.02
12285.04 5893.29 5851.79
12381.59 5926.97 5885.47
12479.16 5961.18 5919.68
70 10
69 33
69 55
69 14
69 43
N 23.26 E .52 8905.18N 3567.22E
N 22.94 E .74 8985.87N 3601.64E
N 22.86 E .40 9067.63N 3636.18E
N 22.47 E .80 9151.13N 3671.05E
N 22.20 E .56 9235.65N 3705.77E
9544.98
9632.05
9720.19
9810.08
9900.91
12574.72 5993.93 5952.43
12670.48 6027.41 5985.91
12765.46 6061.67 6020.17
12860.48 6095.78 6054.28
12953.99 6128.76 6087.26
70 11
68 52
68 49
69 5
69 35
N 22.08 E .51 9318.80N
N 22.05 E 1.37 9401.94N
N 21.74 E .31 9484.14N
N 21.61 E .31 9566.55N
N 21.50 E .54 9647.93N
3739.60E 9990.18
3773.30E 10079.41
3806.34E 10167.54
3839.09E 10255.80
3871.24E 10342.90
SI '.RY-SLTN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COD-RS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13049.04 6161.60 6120.10
13144.21 6194.99 6153.49
13239.44 6228.87 6187.37
13331.85 6260.98 6219.48
13426.84 6294.44 6252.94
69 59 N 21.62 E .44 9730.89N 3904
68 55 N 20.41 E 1.64 9814.07N 3935
69 24 N 20.68 E .58 9897.41N 3967
69 55 N 20.60 E .56 9978.50N 3997
68 49 N 20.82 E 1.18 10061.65N 4029
.02E 10431.69
.98E 10520.47
.21E 10609.20
.75E 10695.58
.19E 10784.19
13521.08 6328.13 6286.63
13614.76 6360.82 6319.32
13709.65 6393.36 6351.86
13803.10 6425.53 6384.03
13897.71 6458.21 6416.71
69 18 N 20.43 E .64 10144.02N 4060
69 50 N 20.93 E .77 10226.15N 4091
70 2 N 20.31 E .65 10309.58N 4122
69 40 N 21.43 E 1.19 10391.55N 4153
69 54 N 21.76 E .41 10474.11N 4186
.19E 10871.93
.20E 10959.43
.59E 11048.29
.84E 11135.71
.52E 11224.09
13991.97 6490.10 6448.60
14086.34 6521.93 6480.43
14181.07 6554.01 6512.51
14273.51 6585.60 6544.10
14369.77 6619.87 6578.37
70 32 N 21.58 E .69 10556.54N 4219
70 1 N 21.36 E .58 10639.21N 4251
70 23 N 20.84 E .64 10722.37N 4283
69 38 N 21.21 E .89 10803.46N 4315
68 39 N 22.10 E 1.34 10887.06N 4348
.27E 11312.37
.79E 11400.82
.87E 11489.61
.04E 11576.16
.23E 11665.68
14464.33 6654.00 6612.50
14556.66 6686.66 6645.16'
14652.04 6719.57 6678.07
14744.82 6750.61 6709.11
14839.38 6782.01 6740.51
69 1 N 22.38 E .49 10968.68N 4381
69 32 N 22.60 E .60 11048.47N 4414
70 5 N 22.73 E .59 11131.08N 4449
70 49 N 22.57 E .80 11211.77N 4482
70 23 N 22.60 E .46 11294.12N 4517
.61E 11753.36
.64E 11839.18
.14E 11928.11
.81E 12014.97
.06E 12103.59
14934.14 6813.41 6771.91
15029.71 6845.25 6803.75
15122.19 6877.35 6835.85
15217.48 6910.83 6869.33
15310.04 6942.06 6900.56
70 54 N 22.56 E .54 11376.67N 4551
70 11 N 22.17 E .84 11460.01N 4585
69 10 N 21.58 E 1.25 11540.48N 4617
69 40 N 21.48 E .53 11623.47N 4650
70 52 N 21.98 E 1.39 11704.41N 4682
.39E 12192.42
.68E 12282.00
.99E 12368.28
.73E 12457.09
.99E 12543.79
15405.16 6973.74 6932.24
15499.90 7006.73 6965.23
15593.28 7039.98 6998.48
15685.14 7072.00 7030.50
15778.74 7103.42 7061.92
70 12 N 20.95 E 1.24 11787.87N 4715
69 1 N 20.55 E 1.31 11870.91N 4747
69 15 N 20.77 E .33 11952.56N 4778
69 55 N 20.32 E .86 12033.18N 4808
70 50 N 20.63 E 1.03 12115.78N 4839
.81E 12633.08
.27E 12721.59
.06E 12808.58
.28E 12894.41
.12E 12982.32
15873.11 7135.12 7093.62
15967.58 7167.36 7125.86
16062.92 7199.25 7157.75
16159.18 7231.10 7189.60
16253.59 7260.34 7218.84
69 53 N 21.38 E 1.26 12198.75N 4870.97E 13070.88
70 11 N 21.58 E .38 12281.38N 4903.49E 13159.28
70 42 N 21.73 E .56 12364.89N 4936.65E 13248.70
70 39 N 21.14 E .58 12449.44N 4969.84E 13339.14
73 16 N 20.40 E 2.87 12533.37N 5001.67E 13428.61
S. .tRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 6
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
MWD SURVEY
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPEKATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
16348.48 7285.14 7243.64 76 25 N 18.69 E 3.75 12619.67N 5032.29E 13520.02
16442.54 7306.18 7264.68 77 43 N 16.61 E 2.57 12707.01N 5060.08E 13611.64
16517.00 7322.00 7280.50 77 43 N 16.61 E .00 12776.74N 5080.88E 13684.39
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 13749.92 FEET
AT NORTH 21 DEG. 41 MIN. EAST AT MD = 16'517
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 16.09 DEG.
SURFACE TIE-IN FOR SPUD 0.00' MD
PROJECTED SURVEY AT 16,517.00' MD
RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLOP~ATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41.50 .00 N .00 E
1000.00 996.04 954.54 32.44 N 50.90 E
2000.00 1933.16 1891.66 324.03 N 218.55 E
3000.00 2632.10 2590.60 981.82 N 457.72 E
4000.00 3024.37 2982.87 1842.29 N 776.37 E
.00
3.96 3.96
66.84 62.89
367.90 301.05
975.63 607.74
5000.00 3379.21 3337.71 2714.88 N 1111.84 E
6000.00 3718.06 3676.56 3590.82 N 1454.98 E
7000.00 4069.53 4028.03 4460.43 N 1801.41 E
8000.00 4425.25 4383.75 5328.64 N 2147.14 E
9000.00 4776.35 4734.85 6201.38 N 2485.73 E
1620.79 645.16
2281.94 661.15
2930.47 648.53
3574.75 644.28
4223.65 648.90
10000.00 5116.85 5075.35 7074.59 N 2833.48 E
11000.00 5446.45 5404.95 7950.12 N 3186.13 E
12000.00 5795.18 5753.68 8821.33 N 3531.52 E
13000.00 6144.81 6103.31 9688.05 N 3887.04 E
14000.00 6492.77 6451.27 10563.58 N 4222.05 E
4883.15 659.50
5553.55 670.40
6204.82 651.28
6855.19 650.37
7507.23 652.03
15000.00 6835.18 6793.68 11434.12 N 4575.13 E
16000.00 7178.34 7136.84 12309.75 N 4914.71 E
16517.00 7322.00 7280.50 12776.74 N 5080.88 E
8164.82 657.60
8821.66 656.83
9195.00 373.34
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
S~ ~{RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATE S
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41
41.50 41.50
141.50 141.50 100
241.51 241.50 200
341.52 341.50 300
.50
.00
.00
.00
.00
.00 N .00 E .00
.00 N .00 E .00 .00
.26 S .46 E .00 .00
.78 S 1.19 E .01 .01
1.22 S 2.68 E .02 .01
441.56 441.50 400
541.63 541.50 500
641.80 641.50 600
742.18 741.50 700
842.93 841.50 800
.00
.00
.00
.00
.00
1.26 S 5.31 E
.90 S 9.17 E
.60 N 14.71 E
4.76 N 22.18 E
12.28 N 31.80 E
.06 .04
.13 .08
.30 .17
.68 .38
1.43 .75
944.26 941.50
1046.54 1041.50
1149.45 1141.50
1252.92 1241.50
1357.23 1341.50
900
1000
1100
1200
1300
.00
.00
.00
.00
.00
24.01 N 43.05 E
39.72 N 57.67 E
57.62 N 74.14 E
77.45 N 91.73 E
100.49 N 110.35 E
2.76 1.32
5.04 2.28
7.95 2.92
11.42 3.46
15.73 4.31
1463.11 1441.50 1400
1570.46 1541.50 1500
1678.04 1641.50 1600
1786.22 1741.50 1700
1896.35 1841.50 1800
.00
.00
.00
.00
.00
129.19 N 129.94 E
163.28 N 148.87 E
198.69 N 166.74 E
235.94 N 184.45 E
278.78 N 201.47 E
21.61 5.89
28.96 7.35
36.54 7.58
44.72 8.18
54.85 10.13
2009.63 1941.50 1900
2127.65 2041.50 2000
2251.67 2141.50 2100
2382.01 2241.50 2200
2519.61 2341.50 2300
.00
.00
.00
.00
.00
328.55 N 220.22 E
387.60 N 241.03 E
457.06 N 264.48 E
536.15 N 291.48 E
624.97 N 323.67 E
68.13 13.29
86.15 18.02
110.17 24.02
140.51 30.34
178.11 37.60
2669.23 2441.50
2834.26 2541.50
3018.00 2641.50
3227.05 2741.50
3470.45 2841.50
2400
2500
2600
2700
2800
.00
.00
.00
.00
.00
728.89 N 363.30 E
851.94 N 408.90 E
996.20 N 463.10 E
1167.99 N 527.72 E
1375.09 N 607.02 E
227.73 49.61
292.76 65.03
376.50 83.74
485.55 109.05
628.95 143.39
3758.28 2941.50 2900.0
4048.42 3041.50 3000.0
4321.58 3141.50 3100.0
4603.71 3241.50 3200.0
4889.82 3341.50 3300.0
1629.18 N 698.01 E
1884.77 N 792.07 E
2122.02 N 883.26 E
2368.13 N 978.25 E
2618.00 N 1075.34 E
816.78 187.84
1006.92 190.14
1180.08 173.16
1362.21 182.13
1548.32 186.11
S ~{RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
5186.31 3441.50 3400.00
5480.77 3541.50 3500.00
5773.20 3641.50 3600.00
6069.40 3741.50 3700.00
6360.54 3841.50 3800.00
2878.61 N 1175.27
3137.11 N 1274.50
3392.43 N 1376.15
3651.17 N 1479.98
3905.00 N 1581.59
E 1744.81 196.49
E 1939.27 194.45
E 2131.70 192.44
E 2327.90 196.20
E 2519.04 191.14
6635.50 3941.50 3900.00
6918.39 4041.50 4000.00
7208.18 4141.50 4100.00
7489.57 4241.50 4200.00
7769.25 4341.50 4300.00
4143.85 N 1674.02
4389.28 N 1772.91
4641.68 N 1874.25
4886.03 N 1971.56
5129.14 N 2066.99
E 2694.00 174.96
E 2876.89 182.89
E 3066.68 189.79
E 3248.07 181.39
E 3427.75 179.68
8045.40 4441.50 4400.00
8318.65 4541.50 4500.00
8604.64 4641.50 4600.00
8898.22 4741.50 4700.00
9188.99 4841.50 4800.00
5367.52 N 2164.02
5603.32 N 2259.16
5852.88 N 2356.63
6111.65 N 2452.65
6367.61 N 2547.69
E 3603.90 176.15
E 3777.15 173.25
E 3963.14 185.99
E 4156.72 193.58
E 4347.49 190.77
9479.33 4941.50 4900.00
9770.08 5041.50 5000.00
10077.15 5141.50 5100.00
10397.82 5241.50 5200.00
10702.52 5341.50 5300.00
6622.56 N 2644.09
6875.43 N 2746.77
7142.20 N 2861.27
7423.83 N 2977.52
7691.50 N 3083.25
E 4537.83 190.33
E 4728.58 190.75
E 4935.65 207.07
E 5156.32 220.68
E 5361.02 204.69
10986.28 5441.50 5400.00
11269.31 5541.50 5500.00
11557.07 5641.50 5600.00
11843.02 5741.50 5700.00
12135.76 5841.50 5800.00
7938.23 N 3181.41
8184.71 N 3278.08
8435.75 N 3376.99
8684.36 N 3476.78
8938.70 N 3581.63
E 5544.78 183.76
E 5727.81 183.03
E 5915.57 187.76
E 6101.52 185.96
E 6294.26 192.74
12422.60 5941.50 5900.00
12709.59 6041.50 6000.00
12990.52 6141.50 6100.00
13275.37 6241.50 6200.00
13558.92 6341.50 6300.00
9186.57 N 3685.70
9435.76 N 3786.99
9679.79 N 3883.79
9928.87 N 3979.09
10177.19 N 4072.55
E 6481.10 186.83
E 6668.09 186.99
E 6849.02 180.93
E 7033.87 184.84
E 7217.42 183.55
13849 . 13 6441.50 6400 . 00
14143 . 80 6541 . 50 6500 . 00
14429 . 40 6641 . 50 6600 . 00
14717 . 09 6741 . 50 6700 . 00
15018 . 66 6841.50 6800 . 00
10431.73 N
10689.56 N
10938.52 N
11187.58 N
11450.38 N
4169.63
4271.38
4369.19
4472.76
4581.76
E 7407.63 190.21
E 7602.30 194.68
E 7787.90 185.60
E 7975.59 187.69
E 8177.16 201.56
RRY-SUN DRILLING SERVICES
ANCHOR3kGE ALASKA
PAGE 10
BP EXPLORATION (ALASKA), INC.
MILNE POINT / MPF-66PB1
50-029-22697-70
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/10/96
DATE OF SURVEY: 090396
JOB NUMBER: AK-MM-60110
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
15308.33 6941.50 6900.00 11702.90 N 4682.38 E 8366.83 189.67
15597.58 7041.50 7000.00 11956.32 N 4779.49 E 8556.08 189.25
15891.67 7141.50 7100.00 12214.99 N 4877.33 E 8750.17 194.09
16191.34 7241.50 7200.00 12477.86 N 4980.75 E 8949.84 199.67
16517.00 7322.00 7280.50 12776.74 N 5080.88 E 9195.00 245.15
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPEP~-Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
8183.58 4491.60 4450.10
8236.18 4511.00 4469.50
8331.47 4543.94 4502.44
8426.53 4572.89 4531.39
8521.22 4597.36 4555.86
68 15 N 21.76 E .00 5486.77N 2213.00E
68 28 N 25.45 E 6.54 5531.56N 2232.58E
71 4 N 23.16 E 3.54 5613.04N 2269.36E
73 26 N 22.93 E 2.51 5696.34N 2304.80E
76 35 N 22.71 E 3.33 5780.65N 2340.27E
5914.10
5962.90
6052.10
6142.53
6233.91
8614.84 4619.47 4577.97
8710.41 4643.24 4601.74
8805.54 4667.00 4625.50
8900.73 4690.79 4649.29
8995.78 4715.01 4673.51
76 5 N 22.02 E .91 5864.77N 2374.88E
75 6 N 21.76 E 1.06 5950.66N 2409.39E
75 58 N 21.73 E .91 6036.22N 2443.51E
75 5 N 20.97 E 1.20 6122.06N 2477.06E
75 22 N 22.23 E 1.31 6207.52N 2510.89E
6324.83
6417.36
6509.45
6601.60
6693.49
9091.15 4739.85 4698.35
9186.38 4764.87 4723.37
9280.11 4788.69 4747.19
9374.67 4813.27 4771.77
9467.53 4837.57 4796.07
74 25 N 21.11 E 1.50 6293.08N 2544.89E
75 6 N 22.21 E 1.32 6378.47N 2578.80E
75 26 N 22.39 E .40 6462.35N 2613.20E
74 25 N 21.89 E 1.19 6546.92N 2647.60E
75 14 N 21.75 E .90 6630.12N 2680.92E
6785.54
6877.39
6968.00
7059.26
7148.85
9559.46 4860.80 4819.30
9653.02 4884.22 4842.72
9746.53 4907.18 4865.68
9839.95 4930.40 4888.90
9933.65 4953.89 4912.39
75 28 N 21.10 E .73 6712.92N 2713.41E
75 32 N 21.10 E .07 6797.43N 2746.02E
76 1 N 20.94 E .'54 6882.04N 2778.53E
75 11 N 21.16 E .91 6966.49N 2811.03E
75 45 N 21.12 E .59 7051.09N 2843.75E
7237.78
7328.36
7419.00
7509.48
7600.18
10026.48 4976.25 4934.75
10119.13 4998.86 4957.36
10213.87 5022.84 4981.34
10305.88 5045.35 5003.85
10399.32 5068.05 5026.55
76 22 N 20.89 E .71 7135.19N 2876.05E
75 22 N 20.34 E 1.22 7219.28N 2907.69E
75 18 N 20.88 E .55 7305.07N 2939.95E
76 22 N 21.30 E 1.23 7388.31N 2972.05E
75 30 N 20.83 E 1.04 7472.89N 3004.62E
7690.27
7780.11
7871.77
7960.97
8051.60
10493.62 5090.88 5049.38
10589.26 5112.67 5071.17
10684.57 5134.25 5092.75
10779.23 5156.75 5115.25
10873.72 5179.33 5137.83
76 28 N 21.30 E 1.14 7558.26N 3037.51E
77 10 N 20.77 E .91 7645.18N 3070.93E
76 40 N 20.50 E .60 7732.06N 3103.65E
75 49 N 20.11 E .97 7818.29N 3135.55E
76 31 N 21.28 E 1.41 7904.11N 3167.97E
8143.09
8236.20
8329.04
8420.98
8512.73
10969.45 5202.36 5160.86
11064.28 5225.58 5184.08
11157.78 5248.82 5207.32
11251.90 5272.28 5230.78
11346.56 5294.78 5253.28
75 38 N 21.06 E .95 7990.76N 3201.53E
76 1 N 21.32 E .49 8076.49N 3234.76E
75 11 N 20.88 E 1.00 8160.98N 3267.35E
75 56 N 21.02 E .81 8246.10N 3299.94E
76 33 N 21.29 E .71 8331.85N 3333.13E
8605.63
8697.57
8788.12
8879.27
8971.20
ORIGINAL
SP5
f-SUN DRILLING SERVICES
ANCHOP~AGE ALASKA
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION' RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11441.51 5317.54 5276.04
11535.21 5340.23 5298.73
11629.63 5363.22 5321.72
11721.78 5386.07 5344.57
11813.96 5408.28 5366.78
75 42
76 15
75 33
75 43
76 22
N 20.87 E .99 8417.86N 3366.28E
N 20.68 E .62 8502.86N 3398.53E
N 20.36 E .81 8588.62N 3430.64E
N 20.68 E .39 8672.23N 3461.94E
N 20.83 E .72 8755.88N 3493.65E
9063.38
9154.28
9245.86
9335.13
9424.59
11908.43 5431.23 5389.73
12002.76 5454.02 5412.52
12096.88 5476.21 5434.71
12192.49 5499.45 5457.95
12288.24 5523.62 5482.12
75 3O
76 31
76 11
75 40
75 4
N 20.10 E 1.19 8841.73N 3525.69E
N 20.99 E 1.41 8927.44N 3557.82E
N 20.55 E .57 9012.96N 3590.25E
N 20.03 E .76 9099.95N 3622.41E
N 20.06 E .63 9186.98N 3654.16E
9516.23
9607.76
9699.22
9791.96
9884.61
12383.19 5547.65 5506.15
12479.05 5571.62 5530.12
12573.99 5594.77 5553.27
12667.61 5617.45 5575.95
12761.82 5640.90 5599.40
75 36
75 26
76 20
75 38
75 32
N 20.52 E .73 9273.14N 3686.02E
N 21.36 E .87 9359.82N 3719.18E
N 21.70 E 1.01 9445.47N 3752.97E
N 21.34 E .84 9529.97N 3786.29E
N 21.19 E .19 9615.00N 3819.38E
9976.47
10069.27
10161.33
10252.14
10343.37
12856.90 5664.13 5622.63
12952.02 5687.48 5645.98
13045.71 5710.76 5669.26
13141.29 5734.99 5693.49
13235.59 5758.78 5717.28
76 10
75 24
75 49
74 48
75 58
N 21.34 E .70 9700.92N 3852.82E
N 21.27 E .82 9786.82N 3886.32E
N 21.40 E .47 9871.35N 3919.34E
N 21.25 E 1.08 9957.48N 3952.97E
N 21.32 E 1.24 10042.50N 3986.09E
10435.56
10527.76
10618.50
10710.94
10802.17
13329.97 5781.40 5739.90
13425.04 5804.61 5763.11
13520.62 5827.94 5786.44
13613.80 5850.34 5808.84
13708.88 5874.38 5832.88
76 17
75 26
76 18
75 52
74 49
N 22.29 E 1.06 10127.56N 4020.13E
N 21.90 E .99 10212.98N 4054.81E
N 22.21 E .97 10298.88N 4089.62E
N 21.93 E .55 10382.70N 4123.60E
N 21.79 E 1.11 10468.08N 4157.85E
10893.77
10985.92
11078.57
11168.98
11260.93
13804.06 5899.11 5857.61
13898.58 5923.82 5882.32
13993.00 5948.10 5906.60
14086.65 5971.25 5929.75
14181.81 5994.67 5953.17
75 3
74 38
75 33
75 48
75 41
N 22.54 E .80 10553.19N 4192.52E
N 22.84 E .55 10637.37N 4227.71E
N 22.69 E .99 10721.50N 4263.02E
N 21.67 E 1.09 10805.52N 4297.28E
N 22.09 E .45 10891.11N 4331.66E
11352.80
11443.96
11535.13
11625.83
11718.03
14274.44 6017.54 5976.04
14369.20 6040.10 5998.60
14463.87 6062.33 6020.83
14556.20 6084.85 6043.35
14650.65 6108.92 6067.42
75 44
76 42
76 8
75 38
74 50
N 21.30 E .84 10974.51N 4364.84E
N 20.68 E 1.20 11060.44N 4397.80E
N 20.22 E .76 11146.66N 4429.96E
N 20.32 E .55 11230.65N 4460.98E
N 21.46 E 1.44 11315.98N 4493.54E
11807.77
11899.79
11991.81
12081.35
12172.67
SPE .r-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS
DIRECTION
DEGREES DG/10
TOTAL
RECTANGULAR COORDINATES
0 NORTH/SOUTH EAST/WEST
VERT.
SECT·
14700.56 6121.45 6079.95
14743.56 6131.78 6090.28
14838.82 6155.15 6113.65
14932.16 6177.98 6136.48
15026.92 6201.25 6159.75
76 4 N 19.82 E
76 6 N 20.49 E
75 30 N 20.14 E
76 10 N 20.30 E
75 23 N 20.07 E
4.04
1.50
.72
.74
.87
11361.18N 4510
11400.36N 4524
11486.97N 4557
11571.89N 4588
11658.11N 4619
.56E 12220.98
.94E 12262.72
.00E 12355.06
.28E 12445.57
.97E 12537.42
15121.98 6224.39 6182.89
15215.94 6246.90 6205.40
15310.95 6270.57 6229.07
15406.04 6294.40 6252.90
15501.25 6318.10 6276.60
76 26
75 50
75 18
75 39
75 30
N 20.50 E
N 20.09 E
N 19.69 E
N 20.21 E
N 20.60 E
1.19
.77
.69
.65
.43
11744.59N 4651
11830.14N 4683
11916.67N 4714
12003.20N 4746
12089.63N 4778
.94E 12629.62
.58E 12720.84
.88E 12812.85
.29E 12904.90
.44E 12997.11
15596.09 6341.63 6300.13
15690.96 6364.85 6323.35
15786.40 6388.64 6347.14
15882.23 6412.96 6371.46
15976.80 6436.66 6395.16
75 45
75 54
75 13
75 22
75 35
N 20.99 E
N 21.68 E
N 21.71 E
N 22.39 E
N 21.67 E
.48
.72
.73
.71
.77
12175.51N 4811
12261.19N 4844
12347.07N 4878
12432.98N 4913
12517.85N 4947
.06E 13088.98
.53E 13180.96
.70E 13273.36
.49E 13366.01
.83E 13457.52
16072.24 6460.24 6418.74
16167.24 6483.61 6442.11
16260.25 6506.46 6464.96
16354.61 6529.01 6487.51
16448.81 6551.38 6509.88
75 47
75 43
75 49
76 31
75 59
N 21.71 E
N 22.42 E
N 21.99 E
N 21.81 E
N 21.77 E
.21
.73
.46
.77
.57
12603.78N 4982
12689.12N 5016
12772.59N 5050
12857.61N 5084
12942.57N 5118
.01E 13549.98
.59E 13642.02
.66E 13732.14
.83E 13823.73
.80E 13915.21
16544.11 6574.90 6533.40
16637.20 6598.20 6556.70
16732.70 6621.58 6580.08
16825.91 6644.19 6602.69
16921.04 6669.27 6627.77
75 26 N 22.03 E
75 34 N 20.89 E
76 5 N 21.22 E
75 49 N 20.83 E
73 35 N 19.85 E
.64
1.19
.63
.49
2.55
13028.26N 5153
13112.13N 5186
13198.54N 5219
13282.95N 5251
13368.97N 5283
.25E 14007.53
.22E 14097.64
.49E 14190.22
.93E 14280.64
· 82E 14372.38
17015.01 6697.58 6656.08
17109.50 6729.74 6688.24
17201.98 6765.06 6723.56
17296.54 6805.23 6763.73
17392.17 6849.81 6808.31
71 19
68 51
66 14
63 28
60 57
N 19.08 E
N 18.40 E
N 18.27 E
N 18·20 E
N 19.09 E
2.54
2.70
2.84
2.91
2.77
13453.43N 5313
13537.54N 5342
13618.67N 5369
13699.96N 5395
13780.12N 5422
.68E 14461.96
.21E 14550.74
· 09E 14636.15
· 88E 14721.68
· 92E 14806.23
17484.24 6896.68 6855.18
17576.31 6947.40 6905.90
17671.89 7003.16 6961.66
17765.39 7061.02 7019.52
17859.80 7121.68 7080.18
57
55
53
5O
49
49
17
19
12
49
N 17.89 E
N 18.24 E
N 19.69 E
N 20.00 E
N 19.61 E
3.58
2.78
2.40
3.34
.52
13855.26N 5448
13928.28N 5471
14001.68N 5497
14070.75N 5522
14138.81N 5546
.06E 14885.42
.87E 14962.16
.09E 15039.75
.01E 15113.18
.52E 15185.51
ORIGINAL
SPE '-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
17954.04 7182.81 7141.31 49 17 N 18.84 E
18049.59 7245.53 7204.03 48 39 N 18.62 E
18143.96 7308.15 7266.65 48 11 N 18.76 E
18237.45 7370.85 7329.35 47 33 N 18.68 E
18330.18 7433.74 7392.24 47 2 N 18.87 E
.84 14206.54N 5570.14E 15257.22
.70 14274.80N 5593.28E 15329.27
.49 14341.68N 5615.90E 15399.83
.68 14407.35N 5638.16E 15469.15
.58 14471.88N 5660.10E 15537.27
18423.28 7497.37 7455.87 46 43 N 18.66 E .38 14536.22N 5681.96E 15605.20
18517.78 7562.29 7520.79 46 30 N 18.79 E .25 14601.26N 5704.00E 15673.84
18611.33 7626.96 7585.46 46 1 N 18.92 E .53 14665.22N 5725.85E 15741.41
18661.17 7661.63 7620.13 45 49 N 18.85 E .40 14699.10N 5737.44E 15777.20
18704.17 7691.74 7650.24 45 17 N 18.96 E 1.27 14728.14N 5747.39E 15807.89
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 15809.83 FEET
AT NORTH 21 DEG. 19 MIN. EAST AT MD = 18704
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 20.42 DEG.
TIE-IN SURVEY A~ 8,183.58' MD
LAST SURVEY STATION AT 18,704.17' MD
SPE
f-SUN DRILLING SERVICES
ANCHOKAGE ALASKA
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50
OPER~ATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8183.58 4491.60 4450.10 5486.77 N 2213.00 E
9183.58 4764.15 4722.65 6375.97 N 2577.78 E
10183.58 5015.16 4973.66 7277.69 N 2929.51 E
11183.58 5255.41 5213.91 8184.29 N 3276.24 E
12183.58 5497.24 5455.74 9091.83 N 3619.45 E
3691.98
4419.43 727.45
5168.42 748.99
5928.17 759.74
6686.34 758.17
13183.58 5746.08 5704.58 9995.51 N 3967.76 E 7
14183.58 5995.11 5953.61 10892.70 N 4332.30 E 8
15183.58 6238.98 6197.48 11800.68 N 4672.80 E . 8
16183.58 6487.64 6446.14 12703.76 N 5022.63 E 9
17183.58 6757.72 6716.22 13602.65 N 5363.80 E 10
437.50 751.17
188.47 750.96
944.60 756.13
695.94 751.35
425.86 729.91
18183.58 7334.56 7293.06 14369.64 N 5625.40 E 10849.02
18704.17 7691.74 7650.24 14728.14 N 5747.39 E 11012.43
423.16
163.41
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
ORIGINAL
SPE" '-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66A
500292269701
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 7/96
DATE OF SURVEY: 092996
JOB NUMBER: AK-EI-60139
KELLY BUSHING ELEV. = 41.50 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8183.58 4491.60 4450.10 5486.77 N 2213.00 E 3691.98
8323.99 4541.50 4500.00 5606.55 N 2266.57 E 3782.49 90.51
8703.62 4641.50 4600.00 5944.57 N 2406.96 E 4062.12 279.63
9097.30 4741.50 4700.00 6298.61 N 2547.02 E 4355.80 293.68
9482.98 4841.50 4800.00 6644.00 N 2686.45 E 4641.48 285.68
9883.41 4941.50 4900.00 7005.67 N 2826.20 E 4941.91 300.43
10289.54 5041.50 5000.00 7373.51 N 2966.28 E 5248.04 306.13
10716.03 5141.50 5100.00 7760.73 N 3114.37 E 5574.53 326.49
11129.15 5241.50 5200.00 8135.12 N 3257.49 E 5887.65 313.12
11540.54 5341.50 5300.00 8507.70 N 3400.36 E 6199.04 311.39
11949.65 5441.50 5400.00 8879.21 N 3539.45 E 6508.15 309.12
12358.45 5541.50 5500.00 9250.70 N 3677.62 E 6816.95 308.80
12764.22 5641.50 5600.00 9617.17 N 3820.22 E 7122.72 305.77
13166.12 5741.50 5700.00 9979.81 N 3961.65 E 7424.62 301.90
13577.55 5841.50 5800.00 10350.10 N 4110.47 E 7736.05 311.43
13966.55 5941.50 5900.00 10697.87 N 4253.14 E 8025.05 289.00
14375.27 6041.50 6000.00 11065.96 N 4399.89 E 8333.77 308.72
14784.01 6141.50 6100.00 11437.15 N 4538.68 E 8642.51 308.74
15193.87 6241.50 6200.00 11810.05 N 4676.23 E 8952.37 309.86
15595.55 6341.50 6300.00 12175.02 N 4810.87 E 9254.05 301.68
15996.24 6441.50 6400.00 12535.34 N 4954.78 E 9554.74 300.69
16407.98 6541.50 6500.00 12905.78 N 5104.11 E 9866.48 311.74
16814.90 6641.50 6600.00 13272.97 N 5248.13 E 10173.40 306.92
17141.42 6741.50 6700.00 13565.71 N 5351.57 E 10399.92 226.52
17374.90 6841.50 6800.00 13765.81 N 5417.99 E 10533.40 133.48
17565.94 6941.50 6900.00 13920.18 N 5469.21 E 10624.44 91.04
17734.52 7041.50 7000.00 14048.28 N 5513.86 E 10693.02 68.58
17890.52 7141.50 7100.00 14160.92 N 5554.40 E 10749.02 55.99
18043.49 7241.50 7200.00 14270.47 N 5591.82 E 10801.99 52.97
18193.91 7341.50 7300.00 14376.88 N 5627.86 E 10852.41 50.42
18341.57 7441.50 7400.00 14479.77 N 5662.80 E 10900.07 47.67
18487.58 7541.50 7500.00 14580.52 N 5696.95 E 10946.08 46.00
18632.25 7641.50 7600.00 14679.46 N 5730.73 E 10990.75 44.68
18663.58 7663.31 7621.81 14700.73 N 5738.00 E 11000.27 9.51
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
S '.~RY-SUN DRILLING SERVICES
ANCHOR3kGE ALAS I¢3k
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
50~292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90
OPERATOR: BP EXPLORATION
FT.
TRUE ST/B-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -41.90
129.46 129.46 87.56
219.70 219.69 177.79
310.17 310.15 268.25
401.29 401.25 359.35
0 0 N .00 E .00 .00N .00E
0 28 S 69.60 E .36 .19S .50E
0 34 S 65.06 E .12 .50S 1.26E
1 2 S 82.99 E .59 .80S 2.49E
1 41 N 82.34 E .80 .72S 4.65E
.00
-.04
-.14
- .08
.60
492.39 492.29 450.39
582.84 582.64 540.74
673.61 673.21 631.31
765.63 764.83 722.93
855.64 854.15 812.25
2 14 N 77.01 E .63 .14S 7.72E
3 7 N 73.55 E 1.00 .96N ll.81E
4 20 N 64.15 E 1.50 3.16N 17.28E
6 13 N 53.58 E 2.29 7.64N 24.43E
7 53 N 46.44 E 2.08 14.79N 32.83E
2.01
4.19
7.82
14.11
23.31
947.52 944.79 902.89
1043.35 1038.60 996.70
1139.03 1131.72 1089.82
1234.17 1223.86 1181.96
1329.81 1315.90 1274.00
10 52 N 41.34 E 3.37 25.64N 43.12E
12 39 N 42.77 E 1.88 40.13N 56.22E
13 53 N 41.52 E 1.33 56.42N 70.94E
14 55 N 41.31 E 1.09 74.17N 86.60E
16 34 N 38.69 E 1.88 94.07N 103.25E
36.59
54.14
73.87
95.27
119.00
1425.41 1406.90 1365.00
1521.05 1496.54 1454.64
1616.65 1585.53 1543.63
1712.11 1674.41 1632.51
1807.10 1762.13 1720.23
19 5 N 35.06 E 2.88 117.51N 120.76E
21 44 N 29.07 E 3.52 145.81N 138.36E
21 7 N 26.75 E 1.10 176.66N 154.71E
21 41 N 27.21 E .63 207.70N 170.52E
23 23 N 24.53 E 2.09 240.47N 186.37E
146.38
178.44
212.61
246.82
282.70
1902.65 1849.14 1807.24
1998.30 1934.33 1892.43
2093.61 2016.61 1974.71
2189.35 2096.37 2054.47
2284.97 2172.89 2130.99
25 22 N 20.68 E 2.66 276.88N 201.48E
28 41 N 20.96 E 3.47 317.51N 216.94E
31 53 N 19.13 E 3.50 362.69N 233.38E
35 14 N 17.91 E 3.56 412.88N 250.17E
38 25 N 18.34 E 3.34 467.35N 268.01E
321.87
365.20
413.16
466.04
523.32
2380.84 2247.04 2205.14
2476.46 2318.65 2276.75
2571.93 2386.69 2344.79
2667.57 2451.06 2409.16
2763.37 2511.74 2469.84
40 13 N 18.79 E 1.91 524.94N 287.35E
42 46 N 19.68 E 2.73 584.75N 308.24E
46 18 N 20.27 E 3.73 647.67N 331.12E
49 4 N 20.88 E 2.93 713.88N 355.99E
52 18 N 20.36 E 3.39 783.25N 382.08E
584.01
647.27
714.07
784.58
858.46
2858.22 2568.56 2526.66
2954.08 2623.20 2581.30
3047.71 2673.30 2631.40
3142.23 2720.90 2679.00
3237.01 2766.47 2724.57
54 5 N 20.33 E 1.88 854.44N 408.48E
56 23 N 20.03 E 2.41 928.35N 435.64E
58 54 N 20.23 E 2.70 1002.59N 462.85E
60 37 N 20.60 E 1.85 1079.11N 491.34E
61 53 N 21.36 E 1.51 115~9,Ni- ~521--.~_0E
934.18
1012.72
1091.59
1173.01
1255.80
ORt61NAL
£~-~'RRY-SUN DRILLING SERVICES
ANCHORAGE DJ_JtS KA
PAGE 2
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTIC~LL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3331.41 2809.23 2767.33 64 13
3426.63 2848.51 2806.61 67 1
3522.08 2883.87 2841.97 69 28
3617.87 2916.86 2874.96 70 13
3713.28 2949.43 2907.53 69 50
N 21.41 E 2.48 1235.04N 551.78E
N 21.25 E 2.94 1315.82N 583.33E
N 20.64 E 2.64 1398.60N 615.01E
N 19.89 E 1.07 1482.96N 646.16E
N 20.22 E .51 1567.20N 676.92E
1339.58
1425.95
1514.27
1603.95
1693.42
3808.24 2982.05 2940.15 69 58
3903.94 3014.57 2972.67 70 18
3999.19 3046.80 3004.90 70 7
4094.89 3080.89 3038.99 68 8
4190.50 3116.00 3074.10 68 46
N 21.03 E .81 1650.66N 708.33E
N 20.85 E .40 1734.72N 740.50E
N 20.42 E .47 1818.60N 772.09E
N 21.75 E 2.44 1902.02N 804.25E
N 21.62 E .68 1984.66N 837.11E
1782.31
1872.00
1961.34
2050.41
2138.91
4286.10 3150.56 3108.66 68 49
4381.87 3184.84 3142.94 69 13
4477.42 3218.38 3176.48 69 40
4572.94 3251.48 3209.58 69 46
4668.64 3284.56 3242.66 69 46
N 21.53 E .10 2067.54N 869.89E
N 21.16 E .55 2150.83N 902.43E
N 21.05 E .49 2234.30N 934.65E
N 21.38 E .33 2317.83N 967.07E
N 21.69 E .30 2401.36N 1000.03E
2227.64
2316.69
2405.81
2495.06
2584.45
4763.67 3317.17 3275.27 70 5
4859.51 3349.92 3308.02 69 57
4953.77 3381.85 3339.95 70 27
5048.30 3413.33 3371.43 70 38
5142.92 3444.39 3402.49 71 1
N 21.48 E .38 2484.37N 1032.86E
N 21.44 E .14 2568.19N 1065.81E
N 21.41 E .54 2650.75N 1098.20E
N 21.00 E .45 2733.85N 1130.45E
N 21.10 E .42 2817.26N 1162.55E
2673.30
2762.98
2851.28
2940.06
3029.10
5237.76 3475.41 3433.51 70 47
5331.83 3506.47 3464.57 70 38
5427.44 3538.42 3496.52 70 18
5520.62 3569.74 3527.84 70 24
5586.00 3591.64 3549.74 70 27
N 21.04 E .26 2900.89N 1194.77E
N 20.61 E .46 2983.89N 1226.33E
N 22.13 E 1.54 3067.80N 1259.16E
N 22.27 E .18 3149.05N 1292.32E
N 22.14 E .21 3206.09N 1315'.60E
3118.39
3206.88
3296.60
3383.86
3445.11
5616.10 3601.72 3559.82
5711.12 3633.76 3591.86
5806.20 3665.84 3623.94
5901.02 3697.40 3655.50
5996.72 3729.09 3687.19
70 24
70 11
70 22
70 43
70 35
N 22.14 E .22 3232.36N 1326.29E
N 22.08 E .23 3315.24N 1359.96E
N 21.78 E .35 3398.26N 1393.38E
N 21.67 E .39 3481.32N 1426.48E
N 22.13 E .48 3565.11N 1460.16E
3473.32
3562.28
3651.32
3740.30
3830.14
6091.39 3760.51 3718.61 70 37
6186.80 3792.14 3750.24 70 39
6282.42 3824.11 3782.21 70 15
6376.75 3857.12 3815.22 68 45
6471.86 3891.86 3849.96 68 23
N 21.81 E .32 3647.92N 1493.58E
N 21.28 E .53 3731.65N 1526.63E
N 21.10 E .45 3815.67N 1559.21E
N 21.38 E 1.61 3898.03N 1591.21E
N 20.99 E .55 3980.58N 1623.20E
3918.97
4008.57
4098.33
4186.33
4274.52
S?=RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6566.79 3926.19 3884.29 69 12 N 21.51 E 1.01 4063.07N 1655.28E
6662.26 3959.98 3918.08 69 20 N 21.36 E .20 4146.18N 1687.91E
6757.42 3993.71 3951.81 69 8 N 22.88 E 1.50 4228.61N 1721.41E
6851.94 4027.21 3985.31 69 20 N 22.05 E .84 4310.29N 1755.18E
6946.43 4059.68 4017.78 70 27 N 22.13 E 1.19 4392.51N 1788.54E
4362.66
4451.57
4540.05
4627.88
4716.13
7040.53 4091.43 4049.53 70 6 N 21.94 E .42 4474.62N 1821.77E
7135.24 4123.47 4081.57 70 21 N 22.07 E .29 4557.25N 1855.16E
7165.29 4133.64 4091.74 70 4 N 21.65 E 1.61 4583.50N 1865.69E
7229.29 4155.45 4113.55 70 4 N 21.76 E .16 4639.40N 1887.94E
7323.69 4187.80 4145.90 69 50 N 21.54 E .33 4721.83N 1920.66E
4804.23
4892.89
4921.02
4980.90
5069.17
7418.40 4220.67 4178.77 69 32 N 21.43 E .34 4804.48N 1953.19E
7512.41 4253.94 4212.04 69 0 N 20.99 E .72 4886.45N 1984.99E
7607.31 4287.34 4245.44 69 46 N 21.42 E .92 4969.26N 2017.12E
7699.95 4319.75 4277.85 69 16 N 20.95 E .72 5050.18N 2048.49E
7794.53 4353.68 4311.78 68 40 N 20.73 E .66 5132.69N 2079.89E
5157.60
5245.17
5333.64
5420.08
5508.06
7889.93 4388.10 4346.20 69 1 N 21.64 E .96 5215.64N 2112.05E
7982.05 4421.51 4379.61 68 26 N 21.50 E .64 5295.48N 2143.61E
8077.72 4456.29 4414.39 68 55 N 21.82 E .59 5378.31N 2176.50E
8250.00 4518.25 4476.35 68 55 N 21.82 E .01 5527.55N 2236.24E
5596.68
5682.14
5770.84
5930.79
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5962.77 FEET
AT NORTH 22 DEG. 1 MIN. EAST AT MD = 8250
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 16.09 DEG.
PROJECTED SURVEY AT 8,250.00' MD
S ~RY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41.90 .00 N .00 E
1000.00 996.30 954.40 33.16 N 49.77 E
2000.00 1935.82 1893.92 318.28 N 217.23 E
3000.00 2648.63 2606.73 964.28 N 448.73 E
4000.00 3047.08 3005.18 1819.31 N 772.36 E
.00
3.70 3.70
64.18 60.48
351.37 287.19
952.92 601.55
5000.00 3397.31 3355.42 2691.31 N 1114.11 E
6000.00 3730.18 3688.28 3567.98 N 1461.33 E
7000.00 4077.64 4035.74 4439.27 N 1807.53 E
8000.00 4428.10 4386.20 5311.01 N 2149.72 E
8250.00 4518.25 4476.35 5527.55 N 2236.24 E
1602.69 649.76
2269.82 667.14
2922.36 652.54
3571.90 649.53
3731.75 159.86
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
'RRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41.90
41.90 41.90 .00
141.90 141.90 100.00
241.91 241.90 200.00
341.92 341.90 300.00
.00 N .00 E .00
.00 N .00 E .00 .00
.22 S .59 E .00 .00
.60 S 1.46 E .01 .00
.87 S 3.07 E .02 .01
441.96 441.90 400.00
542.04 541.90 500.00
642.21 641.90 600.00
742.57 741.90 700.00
843.28 841.90 800.00
.55 S 5.86 E
.33 N 9.67 E
2.12 N 15.14 E
6.15 N 22.42 E
13.62 N 31.60 E
.06 .04
.14 .08
.31 .17
.67 .36
.38 .71
944.58 941.90 900.00
1046.73 1041.90 1000.00
1149.52 1141.90 1100.00
1252.84 1241.90 1200.00
1356.99 1341.90 1300.00
25.23 N 42.76 E 2
40.67 N 56.72 E 4
58.30 N 72.61 E 7
77.78 N 89.77 E 10
100.31 N 108.14 E 15
.68 1.30
.83 2.16
.62 2.79
.94 3.32
.09 4.15
1462.56 1441.90 1400.00
1569 . 86 1541 . 90 1500 . 00
1677 . 13 1641 . 90 1600 . 00
1785 . 06 1741 . 90 1700 . 00
1894 . 64 1841 . 90 1800 . 00
127.88 N 127.68 E
161.59 N 147.04 E
196.21 N 164.61 E
232.51 N 182.74 E
273.67 N 200.27 E
20.66 5.57
27.96 7.30
35.23 7.27
43.16 7.93
52.74 9.58
2006.96 1941.90 1900.00
2123.58 2041.90 2000.00
2245.78 2141.90 2100.00
2374.10 2241.90 2200.00
2508.47 2341.90 2300.00
321.44 N 218.43 E
377.90 N 238.59 E
444.57 N 260.49 E
520.82 N 285.95 E
605.45 N 315.69 E
65
81
103
132
166
.06 12.33
.68 16.62
.88 22.20
.20 28.32
.57 34.37
2653.67 2441.90 2400.00
2812.93 2541.90 2500.00
2987.85 2641.90 2600.00
3185.15 2741.90 2700.00
3409.91 2841.90 2800.00
704.11 N 352.27 E
820.12 N 395.76 E
954.77 N 445.27 E
1114.13 N 504.54 E
1301.51 N 577.76 E
211
271
345
443
568
.77 45.20
.03 59.26
.95 74.92
.25 97.30
.01 124.76
3691.42 2941.90 2900.00
3984.77 3041.90 3000.00
4262.12 3141.90 3100.00
4545.22 3241.90 3200.00
4836.10 3341.90 3300.00
1547.95 N 669.82 E
1805.89 N 767.36 E
2046.75 N 861.68 E
2293.61 N 957.59 E
2547.73 N 1057.77 E
749.52
942.87
1120.22
1303.32
1494.20
181.51
193.35
177.36
183.10
190.88
RRY-SI/N DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION (ALASKA) INC
MILNE POINT/MPF-66
500292269700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/ 6/96
DATE OF SURVEY: 082696
JOB NUMBER: AK-EI-60119
KELLY BUSHING ELEV. = 41.90
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTAi~GULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
5135.25 3441.90 3400.00 2810.50 N 1159.94 E
5437.76 3541.90 3500.00 3076.80 N 1262.82 E
5735.14 3641.90 3600.00 3336.17 N 1368.45 E
6035.29 3741.90 3700.00 3598.81 N 1473.87 E
6334.54 3841.90 3800.00 3861.36 N 1576.88 E
1693.35 199.15
1895.86 202.51
2093.24 197.38
2293.39 200.15
2492.64 199.25
6611.07 3941.90 3900.00 4101.58 N 1670.46 E
6893.60 4041.90 4000.00 4346.42 N 1769.81 E
7189.54 4141.90 4100.00 4604.68 N 1874.10 E
7478.79 4241.90 4200.00 4857.14 N 1973.75 E
7762.13 4341.90 4300.00 5104.46 N 2069.21 E
2669.17 176.53
2851.70 182.53
3047.64 195.93
3236.89 189.25
3420.23 183.34
8037.74 4441.90 4400.00 5343.68 N 2162.64 E 3595.84
8250.00 4518.25 4476.35 5527.55 N 2236.24 E 3731.75
175.61
135.91
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
gyro/data
F-PAD WELL NO:MPF-66A
MILNE POINT, NORTH SLOPE, ALASKA
Gyro Multishot Survey Inside 7" Casing
Survey date · 10 - OCT, 1996
Job number :AKlO9eCr~u R I G I N A L
JUL 2_,_8 ~g~7
¢iJ ,& 6as cons, oornmis,~',,
~nch0rag~
SR366.DOC
Gyrodata Incorporated
P.O. Box 79389
Houston, Texas 77279
713/461-3146
Fax: 713/461-0920
October 18, 1996
B.P. Exploraton (Alaska) Inc.
Petrotechnical Data Center, MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
Re: F-Pad, Well No: MPF-66A, Milne Point, North Slope AK
Enclosed please find one (1) original and six (6) copies and one (1) disk of the completed
survey of Well #MPF-66A
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Since~
Jack E~. ]May. _ _/
Asst. Operations Ivl/anager
JEMYfec
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gyro/data
CONTENTS
JOB NUMBER :AK1096C366
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR366.DOC
gyro/data
1. DISCUSSION , SURVEY CERTIFICATION SHEET
SR366.DOC
gyro/data
DISCUSSION
JOB NUMBER ' AK1096C366
Tool 750 was run in WELL# MPF-66A on ATLAS 15/32" Wireline inside casing, survey was run without
problems.
SR366.DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER ' AK1096C366
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations' for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
SR366.DOC
gyro/data
2. SURVEY DETAILS
SR366.DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK1096C366
CLIENT:
B.P. EXPLORATION
RIG:
.ATLAS WIRELINE
LOCATION:
MILNE POINT FIELD, ALASKA
WELL:
MPF-66A
LATITUDE:
70.505 N
LONGITUDE:
149.5 W
SURVEY DATE:
16,OCT 1996
SURVEY TYPE :
MULTISHOT IN 7 IN. CASING
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
41.5
15140
SURVEY TIED ONTO:
NA
SURVEY INTERVAL:
0'-15140' 50'
UTM CO-ORDINATES:
TARGET DIRECTION:
20.42
GRID CORRECTION:
N/A
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
TOM STODDARD
SR366.DOC
gyro/data
3. OUTRUN SURVEY LISTING
SR366.DOC
A Gyroda t a D i re c t i ona i Survey
for
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7" CASING
Location: , MILNE POINT, ALASKA
Job Number: AK1096C366
Run Date: 16-Oct-96 17:01:15
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub-sea Correction from Vertical Reference: 41 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 20.420 deg
Vertical Section Calculated from Well Head Location'
Closure' Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
A Gy r o d a t a
CAS ING
ALASKA
Directional
Survey
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0 0.0 -41.0
(0'- 15140'.) A GYRO MULTISHOT SURVEY IN 7" CASING .
MEASURED DEPTHS ARE REFERENCED TO THE ORIGINAL R.K.B.
0.00 0.0 0.0
OF 41 FT. ELEVATION.
Page 1
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
60.0 .09 83.80 i 60.0 .0 19.0
160.0 .42 81.69 160.0 .2 119.0
260.0 .94 129.16 260.0 .1 219.0
360.0 1.09 90.44 360.0 .2 319.0
460.0 2.27 74.47 459.9 1.7 418.9
560.0 2.96 83.00 559.8 4.0 518.8
660.0 4.12 64.08 659.6 7.8 618.6
760.0 6.03 54.52 759.2 14.8 718.2
860.0 8.59. 46.68 858.4 25.8 817.4
960.0 11.63 44.43 956.9 41.7 915.9
1060.0 12.92 44.79 1054.6 61.1 1013.6
1160.0 14.23 43.46 1151.8 82.6 1110.8
1260.0 15.65 41.98 1248.4 106.5 1207.4
1360.0 18.09 38.00 1344.1 133.8 1303.1
1460.0 20.76 32.80 1438.4 166.0 1397.4
1560.0 20.79 30.16 1531.9 200.8 1490.9
1660.0 21.40 29.38 1625.2 236.3 1584.2
1760.0 22.88 26.76 1717.8 273.6 1676.8
1860.0 25.07 22.91 1809.2 314.1 1768.2
1960.0 28.44 22.30 1898.5 359.1 1857.5
· 15 .0 83.8
.33 .5 82.2
· 72 1.5 104.8
.69 3.2 106.6
1.26 5.9 93.8
· 79 10.4 87.5
1.63 16.3 81.8
2.09 24.7 73.6
2.74 36.7 65.6
3.06 53.5 59.1
1.29 74.3 55.0
1.34 97.4 52.4
1.48 122.9 50.4
2.69 151.5 48.4
3.18 184.0 46.0
.94 218.5 43.7
.67 253.6 41.7
1.78 290.3 40.0
2.68 329.7 38.1
3.38 373.3 36.3
.01 N .05 E
.07 N .49 E
.40 S 1.49 E
.92 S 3.07 E
.40 S 5.93 E
.45 N 10.39 E
2.33 N 16.18 E
6.95 N 23.69 E
15.13 N 33.41 E
27.46 N 45.90 E
42.59 N 60.84 E
59.45 N 77.17
78.40 N 94.65 ~.
100.66 N 113.23 E
127.80 N 132.39 E
158.04 N 150.91 E
189.28 N 168.77 E
222.54 N 186.48 E
259.42 N 203.48 E
300.98 N 220.77 E
Gyrodata Di
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
2010.0 30.58 21.17 1942.0
2060.0 31.67 20.80 1984.8
2110.0 34.15 20.00 2026.8
2160.0 35.40 19.88 2067.8
2210.0 37.57 19.87 2108.0
2260.0 38.78 19.84 2147.3
2310.0 39.70 20.08 2186.1
2360.0 40.83 20.26 2224.2
2410.0 42.28 20.78 2261.6
2460.0 43.69 21.09 2298.2
2510.0 45.70 21.36 2333.7
2560.0 47.36 21.44 2368.1
2610.0 48.74 21.60 2401.6
2660.0 50.35. 21.67 2434.0
2710.0 51.99 21.48 2465.4
2760.0 53.22 21.29 2495.7
2810.0 54.24 21.33 2525.3
2860.0 55.46 21.21 2554.1
2910.0 56.53 21.10 2582.0
2960.0 58.46 20.99 2608.9
3010.0 59.18 21.12 2634.8
3060.0 60.42 21.08 2660.0
3110.0 61.10 21.26 2684.4
3160.0 62.22 21.48 2708.1
3210.0 61.73 22.04 2731.6
r e c
t i o n a 1
DOGLEG
SEVERITY DIST.
deg. / feet
100 ft.
Page 2
CLOSURE C,~,~ ' ~i~ O~/R~ I Z O N T A L
AZIMUTH C O ~g9 R D I N A T E S
deg. ~.~,m'~ feet
383.7 1901.0 4.42 397.2
409.6 1943.8 2.21 422.2
436.7 1985.8 5.04 448.6
465,2 2026.8 2.50 476.4
495.0 2067.0 4.34 505.4
525.9 2106.3 2.42 535.6
557.5 2145.1 1.86 566.7
589.8 2183.2 2.27 598.5
623.0 2220.6 2.98 631.2
657.1 2257.2 2.85 664.9
692.2 2292.7 4.04 699.7
728.5 2327.1 3.32 735.7
765.7 2360.6 2.77 772.7
803.7 2393.0 3.22 810.5
842.7 2424.4 3.29 849.2
882.4 2454.7 2.48 888.7
922.7 2484.3 2.04 928.8
963.6 2513.1 2.45 969.5
1005.0 2541.0 2.15 1010.8
1047.2 2567.9 3.86 1052.7
1089.9 2593.8 1.46 1095.3
1133.2 2619.0 2.48 1138.4
1176.8 2643.4 1.40 1181.9
1220.8 2667.1 2.27 1225.8
1264.9 2690.6 1.39 1269.8
35.4 323.86 N 229.88 E
34.5 347.99 N 239.14 E
33.7 373.45 N 248.60 E
32.8 400.26 N 258.32
32.1 428.22 N 268.43 E
31.4 457.28 N 278.93 E
30.7 487.01 N 289.72 E
30.2 517.34 N 300.87 E
29.7 548.41 N 312.49 E
29.2 580.24 N 324.68 E
28.8 613.02 N 337.41 E
28.5 646.81 N 350.65 E
28.1 681.40 N 364.29 E
27.8 716.76 N 378.32 E
27.5 752.98 N 392.64 E
27.3 789.97 N 407.12 E
27.0 827.53 N 421.77 -
26.8 865.62 N 436.60 ~
26.5 904.28 N 451.56 E
26.3 943.63 N 466.70 E
26.1 983.55 N 482.07 E
25.9 1023.87 N 497.63 E
25.7 1064.55 N 513.38 E
25.6 1105.53 N 529.42 E
25.5 1146.53 N 545.78 E
A GYro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7" 'cASING
Location: , MILNE POINT, ALASKA
Job Number: AK1096C366 :
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
·
VERTICAL
SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG cLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
Page 3
HORIZONTAL
COORDINATES
feet
3260.0 63.57 22.16 2754.6
3310.0 64.82 22.02 2776.3
3360.0 64.70 22.04 2797.7
3410.0 67.87 21.84 2817.8
3460.0 69.20 21.53 2836.1
1309.3
1354.3
1399.5
1445.2
1491.8
2713.6 3.69 1314.1 25.3
2735.3 2.51 1359.1 25.2
2756.7 .24 1404.2 25.1
2776.8 6.35 1449.9 25.0
2795.1 2.72 1496.4 24.9
1187.67 N 562.49 E
1229.38 N 579.42 E
1271.31 N 596.38 E
1313.76 N 613.48
1357.00 N 630.67 E
3510.0 69.98 21.06 2853.5
3560.0 68.75 20.62 2871.1
3610.0 69.20 20.63 2889.1
3660.0 69.46 20.74 2906.7
3710.0 69.33 21.31 2924.3
3760.0 69.34 21.37 2941.9
3810.0 70.27 21.26 2959.2
3860.0 70.18 21.48 2976.1
3910.0 69.84 21.46 2993.2
3960.0 70'.59 21.57 3010.1
1538.6
1585.4
1632.1
1678.9
1725.7
1772.4
1819.4
1866.4
1913.4
1960.4
2812.5 1.79 1543.2 24.8
2830.1 2.59 1589.8 24.7
2848.1 .90 1636.4 24.6
2865.7 .56 1683.1 24.5
2883.3 ~1.10 1729.8 24.4
2900.9 .11 1776.5 24.3
2918.2 1.87 1823.4 24.2
2935.1 .45 1870.4 24.2
2952.2 .68 1917.3 24.1
2969.1 1.51 1964.3 24.0
1400.66 N 647.69 E
1444.39 N 664.34 E
1488.07 N 680.78 E
1531.84 N 697.30 E
1575.52 N 714.09 E
1619.10 N 731.12 E
1662.81 N 748.18 E
1706.63 N 765.32 E
1750.36 N 782.52 E
1794.13 N 799.77 E
4010.0 69.73 21.59 3027.1
4060.0 68.14 22.06 3045.1
4110.0 67.94 22.32 3063.8
4160.0 68.55 22.22 3082.3
4210.0 68.64 22.19 3100.6
2007.4
2054.1
2100.4
2146.9
2193.4
2986.1
3004.1
3022.8
3041.3
3059.6
1.72 2011.3 24.0
3.30 2057.9 23.9
.63 2104.3 23.9
1.23 2150.7 23.8
.19 2197.2 23.8
1837.86 N 817.07 E
1881.18 N 834.42
1924.11 N 851.93 ~
1967.09 N 869.53 E
2010.19 N 887.12 E
4260.0 68.96 22.06 3118.6
4310.0 68.58 21.86 3136.7
4360.0 69.27 21.93 3154.7
4410.0 69.98 21.89 3172.1
4460.0 69.22 22.00 3189.6
2240.0
2286.6
2333.2
2380.1
2426.9
3077.6 .68 2243.8 23.8
3095.7 .85 2290.4 23.7
3113.7 1.39 2337.0 23.7
3131.1 1.42 2383.9 23.7
3148.6 1.53 2430.7 23.6
2053.37 N 904.68 E
2096.60 N 922.11 E
2139.89 N 939.51 E
2183.37 N 957.00 E
2226.84 N 974.51 E
A Gyroda t a D i re c t i ona I Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
4510.0 70.00 22.08 3207.0
4560.0 69.77 22.25 3224.2
4610.0 69.94 22.27 3241.4
4660.0 70.17 22.29 3258.5
4710.0 69.87 22.09 3275.5
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
2473.8 3166.0 1.57 2477.6 23.6
2520.7 3183.2 .56 2524.5 23.6
2567.6 3200.4 .34 2571.5 23.6
2614.6 3217.5 .46 2618.4 23.5
2661.5 3234.5 .71 2665.4 23.5
HORIZONTAL
COORDINATES
feet
2270.28 N 992.10 E
2313.76 N 1009.81 E
2357.21 N 1027.59 m
2400.70 N 1045.41
2444.21 N 1063.16 E
4760.0 70.40 22.14 3292.5
4810.0 68.96 22.00 3309.9
4860.0 70.22 21.92 3327.3
4910.0 69.66 ' 21.82 3344.5
4960.0 70.32 21.83 3361.6
2708.6 3251.5 1.06 2712.4 23.5
2755.4 3268.9 2.89 2759.3 23.5
2802.3 3286.3 2.52 2806.1 23.4
2849.2 3303.5 1.14 2853.1 23.4
2896.2 3320.6 1.32 2900.1 23.4
2487.77 N 1080.86 E
2531.22 N 1098.48 E
2574.68 N 1116.00 E
2618.27 N 1133.50 E
2661.88 N 1150.96 E
5010.0 70.24 21.71 3378.5
5060.0 70.90 21.64 3395.1
5110.0 71.73 21.62 3411.1
5160.0 70.99. 21.45 3427.1
5210.0 70.33 21.31 3443.6
5260.0 70.17 21.02 3460.5
5310.0 70.15 20.95 3477.5
5360.0 70.76 21.13 3494.2
5410.0 70.63 22.41 3510.8
5460.0 69.69 22.63 3527.7
2943.2 3337.5 .28 2947.1 23.4
2990.4 3354.1 1.33 2994.2 23.3
3037.7 3370.1 1.66 3041.6 23.3
3085.1 3386.1 1.51 3088.9 23.3
3132.3 3402.6 1.35 3136.1 23.2
3179.3 3419.5 .63 3183.1 23.2
3226.4 3436.5 .14 3230.1 23.2
3273.5 3453.2 1.27 3277.2 23.2
3320.6 3469.8 2.43 3324.4 23.1
3367.6 3486.7 1.93 3371.4 23.1
2705.60 N 1168.42 E
2749.41 N 1185.84 E
2793.44 N 1203.29 E
2837.51 N 1220.69 E
2881.44 N 1237.88 E
2925.33 N 1254.88 E
2969.24 N 1271.72 ~,
3013.22 N 1288.64 ~
3057.04 N 1306.14 E
3100.49 N 1324.15 E
5510.0 70.37 22.57 3544.8
5560.0 69.93 22.61 3561.8
5610.0 70.06 22.42 3578.9
5660.0 69.57 22.32 3596.2
5710.0 70.58 22.39 3613.2
3414.6 3503.8 1.36 3418.4 23.1
3461.6 3520.8 .88 3465.4 23.1
3508.6 3537.9 .44 3512.4 23.1
3555.5 3555.2 1.00 3559.3 23.1
3602.4 3572.2 2.02 3606.3 23.1
3143.87 N 1342.21 E
3187.29 N 1360.27 E
3230.69 N 1378.27 E
3274.09 N 1396.13 E
3317.56 N 1414.00 E
A Gyrodat a Di re c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
C'ASING
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
10.0 ft.
HORIZONTAL
COORDINATES
feet
5760.0 69.72 22.27 3630.2
5810.0 69.96 22.29 3647.4
5860.0 70.90 22.20 3664.1
5910.0 70.57 22.40 3680.6
5960.0 70.82 22.50 3697.2
3649.4 3589.2 1.73 3653.4 23.1
3696.3 3606.4 .48 3700.3 23.1
3743.4 3623.1 1.89 3747.4 23.1
3790.6 3639.6 .76 3794.6 23.0
3837.8 3656.2 .53 3841.8 23.0
3361.07 N
3404.50 N
3448.10 N
3491.77 N
3535.39 N
1431.87 E
1449.67 E
1467.50 ~
1485.41
1503.43 E
6010.0 70.13 22.34 3713.9
6060.0 70.53 22.19 3730.7
6110.0 70.17 22.18 3747.5
6152.7 70.52 21.79 3761.9
6202.7 70.21 21.64 3778.7
3884.9 3672.9 1.41 3888.9 23.0
3931.9 3689.7 .85 3936.0 23.0
3979.0 3706.5 .72 3983.1 23.0
4019.2 3720.9 1.19 4023.3 23.0
4066.2 3737.7 .68 4070.3 23.0
3578.95 N
3622.52 N
3666.12 N
3703.43 N
3747.12 N
1521.41 E
1539.25 E
1557.03 E
1572.09 E
1589.49 E
6252.6 70.25 21.68 3795.6
6302.5 69.03 21.31 3'812.9
6352.4 68.30 21.42 3831.1
6402.4 68.34· 21.56 3849.5
6452.3 69.27 21.63 3'867.6
4113.2 3754.6 .11 4117.3 23.0
4160.0 3771.9 2.54 4164.1 23.0
4206.5 3790.1 1.48 4210.6 22.9
4252.9 3808.5 .27 4256.9 22.9
4299.4 3826.6 1.87 4303.5 22.9
3790.79 N
3834.34 N
3877.65 N
3920.82 N
3964.11 N
1606.83 E
1623.98 E
1640.92 E
1657.92 E
1675.05 E
6502.2 69.54 21.94 3885.2
6552.2 68.28 21.78 3903.1
6602.1 67.63 21.60 3921.9
6652.0 69.68 22.40 3940.0
6701.9 69.08 22.85 3957.6
4346.2 3844.2 .79 4350.2 22.9
4392.7 3862.1 2.54 4396.8 22.9
4439.0 3880.9 1.34 4443.1 22.9
4485.5 3899.0 4.37 4489.6 22.9
4532.2 3916.6 1.47 4536.3 22.9
4007.51 N
4050.74 N
4093.74 N
4136.86 N
4179.99 N
1692.40 E
1709.74
1726.85 m
1744.27 E
1762.25 E
6751.9 68.69 22.83 3975.6
6801.8 69.39 22.73 3993.5
6851.7 69.89 22.99 4010.8
6901.7 69.48 22.91 4028.2
6951.6 70.43 22.75 4045.3
4578.7 3934.6 .78 4582.9 22.9
4625.3 3952.5 1.41 4629.5 22.9
4672.1 3969.8 1.11 4676.3 22.9
4718.8 3987.2 .83 4723.1 22.9
4765.7 4004.3 1.93 4770.0 22.9
4222.92 N
4265.90 N
4309.04 N
4352.16 N
4395.38 N
1780.33 E
1798.38 E
1816.56 E
1834.82 E
1853.02 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft. ,,,
HORIZONTAL
COORDINATES
feet
7001.5 70.75 22.59 4061.9
7051.4 70.15 22.50 4078.6
7101.4 71.10 22.50 4095.2
7151.3 69.97 22.27 4111.8
'7201.2 70.71 22.24 4~128.6
7251.2 69.58 22.15 4145.5
7301.1 69.51 22.01 4163.0
7351.0 69.37 21.73 4180.5
7401.0 69.23 21.76 4198.2
7450.9 68.49 21.56 4216.2
7500.8 68.64 21.84 4234.4
7550.7 70.00 22.06 4252.1
7600.7 69.29 21.86 4269.4
7650.6 69.03~ 21.63 4287.2
7700.5 69.22 21.37 4305.0
4812.8 4020.9 .71 4817.1 22.9
4859.8 4037.6 1.21 4864.2 22.9
4906.8 4054.2 1.90 4911.3 22.9
4953.9 4070.8 2.30 4958.3 22.8
5000.9 4087.6 1.48 5005.4 22.8
5047.8 4104.5 2.27 5052.3 22.8
5094.6 4122.0 .30 5099.1 22.8
5141.3 4139.5 .60 5145.8 22.8
5188.0 4157.2 .29 5192.5 22.8
5234.6 4175.2 1.53 5239.1 22.8
5281.0 4193.4 .60 5285.6 22.8
5327.7 4211.1 2.75 5332.3 22.8
5374.5 4228.4 1.47 5379.1 22.8
5421.2 4246.2 .68 5425.7 22.8
5467.8 4264.0 .62 5472.4 22.8
4438.84 N
4482.29 N
4525.81 N
4569.34 N
4612.85 N
4656.33 N
4699.68 N
4743.07 N
4786.45 N
4829.73 N
4872.91 N
4916.24 N
4959.65 N
5002.99 N
5046.40 N
1871.17 E
1889.21 E
1907.24 ~
1925.16
1942.97 E
1960.71 E
1978.30 E
1995.71 E
2013.01 E
2030.20 E
2047.39 E
2064.85 E
2082.35 E
2099.64 E
2116.74 E
7750.5 69.09 21.50 4322.8
7800.4 69.52 22.07 4340.4
7850.3 68.80 22.10 4358.2
7900.2 68.73 22.02 4376.2
7950.2 68.65 22.03 4394.4
5514.5 4281.8 .36 5519.0 22.7
5561.2 4299.4 1.37 5565.7 22.7
5607.8 4317.2 1.44 5612.4 22.7
5654.3 4335.2 .20 5658.9 22.7
5700.8 4353.4 .16 5705.4 22.7
5089.83 N
5133.21 N
5176.44 N
5219.58 N
5262.70 N
2133.79 E
2151.12
2168.67 ~
2186.15 E
2203.59 E
8000.1 68.30 22.46 4412.7
8050.0 69.19 22.38 4430.8
8100.0 69.15 22.22 4448.6
8149.9 68.29 22.10 4466.7
8199.8 68.41 22.47 4485.1
5747.2 4371.7 1.06 5751.9 22.7
5793.8 4389.8 1.79 5798.4 22.7
5840.4 4407.6 .31 5845.1 22.7
5886.9 4425.7 1.74 5891.6 22.7
5933.3 4444.1 .73 5938.0 22.7
5305.69 N
5348.70 N
5391.88 N
5434.97 N
5477.91 N
2221.18 E
2238.92 E
2256.63 E
2274.18 E
2291.78 E
A Gyr oda t a D i r e c t iona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet 'deg.
100 ft.
HORIZONTAL
COORDINATES
feet
8249.8
8299.7
8349.6
8399.5
8449.5
70.34 22.19 4502.7
72.55 22.00 4518.6
71.57 21.47 4534.0
72.53 21.36 4549.3
75.69 21.11 4563.0
5980.0 4461.7 3.90 5984.7 22.7
6027.3 4477.6 4.44 ,6032.0 22.7
6074.8 4493.0 2.21 6079.5 22.7
6122.3 4508.3 1.93 6127.0 22.7
6170.3 4522.0 6.35 6175.0 22.7
5521.13 N
5564.99 N
5609.11 N
5653.33 N
5698.08 N
2309.53 E
2327.33 E
2344.92 E
2362.27
2379.66 E
8499.4
8549.3
8599.3
8649.2
8699.1
76.12 20.78 4575.2
74.41 20.55 4587.9
75.88 20.45 4600.7
75.30 20.27 4613.1
74.95 20.01 4625.9
6218.7 4534.2 1.07 6223.4 22.7
6267.0 4546.9 3.45 6271.7 22.6
6315.2 4559.7 2.95 6319.9 22.6
6363.6 4572.1 1.21 6368.2 22.6
6411.9 4584.9 .86 6416.4 22.6
5743.31 N
5788.49 N
5833.69 N
5879.03 N
5924.33N
2396.97 E
2414.01 E
2430.91 E
2447.73 E
2464.35 E
8749.0
8799.0
8848.9
8898.8
8948.8
74.61 20.28 4639.0
76.32 19.98 4651.6
75.04 19.65 4663.9
74.83. 19.94 4676.9
75.13 20.57 4689.8
6460.0 4598.0 .86 6464.6 22.6
6508.4 4610.6 3.47 6512.9 22.5
6556.7 4622.9 2.64 6561.2 22.5
6605.0 4635.9 .70 6609.3 22.5
6653.2 4648.8 1.36 6657.5 22.5
5969.57 N
6014.94 N
6060.46 N
6105.82 N
6151.06 N
2480.94 E
2497.57 E
2513.97 E
2530.30 E
2546.99 E
8998.7
9048.6
9098.6
9148.5
9198.4
73.87 20.43 4703.2
74.36 20.27 4716.8
74.73 20.77 4730.1
76.01 20.67 4742.7
75.37 21.09 4755.1
6701.3 4662.2 2.54 6705.6 22.5
6749.3 4675.8 1.03 6753.6 22.5
6797.4 4689.1 1.22 6801.7 22.4
6845.7 4701.7 2.57 6850.0 22.4
6894.1 4714.1 1.52 6898.4 22.4
6196.13 N
6241.15 N
6286.22 N
6331.41 N
6376.61 N
2563.84 E
2580.54 - ,
2597.41 _ '
2614.50 E
2631.75 E
9248.3
9298.3
9348.2
9398.1
9448.1
75.10 21.03 4767.8
74.54 20.68 4780.9
73.33 20.49 4794.7
75.70 20.51 4808.0
75.03 20.29 4820.6
6942.4 4726.8 .55 6946.6 22.4
6990.6 4739.9 1.31 6994.8 22.4
7038.6 4753.7 2.45. 7042.7 22.4
7086.7 4767.0 4.75 7090.8 22.4
7135.0 4779.6 1.41 7139.1 22.4
6421.66 N
6466.69 N
6511.61 N
6556.68 N
6601.96 N
2649.10 E
2666.25 E
2683.12 E
2699.97 E
2716.81 E
A Gyrodata Di
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
r e c t i o n a 1
DOGLEG
SEVERITY DIST.
deg./ feet
100 ft.
CLOSURE ......... ~ ......H Q~:R I Z 0 N T A n
AZIMUTH C 0'$ R D I N A T E S
deg. ~ feet
9498.0 75.92 20.20 4833.2
9547.9 74.39 20.01 4846.0
9597.8 75.99 19.81 4.858.7
9647.8 74.86 19.73 4871.3
9697.7 76.05 19.78 4883.8
7183.3 4792.2
7231.6 4805.0
7279.8 4817.7
7328.2 4830.3
7376.5 4842.8
1.79 7187.4 22.4 6647.30 N 2733.54 E
3.09 7235.6 22.3 6692.62 N 2750.13 E
3.23 7283.9 22.3 6738.01 N 2766.56 ~
2.27 7332.1 22.3 6783.48 N 2782.91
2.39 7380.4 22.3 6828.96 N 2799.24 E
9747.6 74.95 19.55 4896.3
9797.6 75.75 19.29 4909.0
9847.5 74.09 19.22 4921.'9
9897.4 75.70 19.14 4935.0
9947.3 75.37 19.21 49'47.4
7424.8 4855.3
7473.1 4868.0
7521.3 4880.9
7569.5 4894.0
7617.8 4906.4
2.25 7428.7 22.3 6874.48 N 2815.51 E
1.68 7476.9 22.3 6920.04 N 2831.57 E
3.33 7525.1 22.2 6965.55 N 2847.47 E
3.23 7573.2 22.2 7011.08 N 2863.30 E
.67 7621.5 22.2 7056.74 N 2879.18 E
9997.3 75.68 19.04 4959.9
10047.2 75.61 18.84 4972.3
10097.1 74.64 18.69 4985.1
10147.1 74.28 19.09 4998.5
10197.0 75.05 19.11 5011.7
7666.2 4918.9
7714.5 4931.3
7762.8 4944.1
7810.9 4957.5
7859.0 4970.7
.70 7669.8 22.2 7102.42 N 2895.02 E
.41 7718.1 22.2 7148.17 N 2910.72 E
1.96 7766.2 22.1 7193.86 N 2926.25 E
1.06 7814.3 22.1 7239.38 N 2941.82 E
1.54 7862.4 22.1 7284.88 N 2957.58 E
10246.9 76.19 19.43 5024.1
10296.9 73.39 19.09 5037.2
10346.8 74.95 18.85 5050.8
10396.7 76.56 18.87 5063.1
10446.6 76.00 19.15 5074.9
7907.3 4983.1
7955.5 4996.2
8003.5 5009.8
8051.9 5022.1
8100.4 5033.9
2.37 7910.7
5.65 7958.8
3.16 8006.7
3.22 8055.1
1.25 8103.5
22.1 7330.53 N 2973.5'4 E
22.1 7376.01 N 2989.43
22.0 7421.43 N 3005.04 ~
22.0 7467.23 N 3020.69 E
22.0 7513.09 N 3036.49 E
10496.6 75.68 19.33 5087.1
10546.5 77.40 19.53 5098.8
10596.4 77.22 19.27 5109.7
10646.4 75.73 19.13 5121.4
10696.3 76.14 18.90 5133.5
8148.8 5046.1
8197.3 5057.8
8246.0 5068.7
8294.6 5080.4
8343.0 5092.5
.73 8151.9 22.0 7558.80 N 3052.44 E
3.47 8200.4 22.0 7604.59 N 3068.59 E
.62 8249.0 22.0 7650.53 N 3084.77 E
3'.00 8297.5 21.9 7696.37 N 3100.74 E
.93 8345.9 21.9 7742.16 N 3116.52 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
,,
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
10746.2 72.78 18.9.1 5146.9
10796.1 76.58 19.59 5160.1
10846.1 75.27 19.72 5172.3
10896.0 75.80 19.61 5184.7
10945.9 74.95 19.63 5197.3
8391.1 5105.9 6.73 8393.9 21.9
8439.2 5119.1 7.72 8442.0 21.9
8487.6 5131.3 2.64 8490.4 21.9
8536.0 5143.7 1.08 8538.7 21.9
8584.3 5156.3 1.70 8587.0 21.9
7787.67 N
7833.12 N
7878.73 N
7924.25 N
7969.76 N
3132.10 E
3147.97 E
3164.26 ~
3180.53
3196.76 E
10995.9 76.26 19.86 5209.7
11045.8 75.59 19.82 5221.9
11095.7 74.54 19.60 5234.8
11145.7 75.07 19.50 5247.8
11195.6 75.52 19.61 5260.5
8632.6 5168.7 2.66 8635.3 21.8
8681.1 5180.9 1.34 8683.7 21.8
8729.3 5193.8 2.15 8731.9 21.8
8777.5 5206.8 1.08 8780.1 21.8
8825.8 5219.5 .93 8828.3 21.8
8015.28 N
8060.83 N
8106.25 N
8151.65 N
8197.16 N
3213.09 E
3229.53 E
3245.80 E
3261.92 E
3278.09 E
11245.5 76.60 19.76 5272.5
11295.4 75.41 19.91 5284.6
11345.4 76.43 19.72 5296.8
11395.3 75.32 19.52 5308.9
11445.2 76.30 19.46 5321.2
8874.2 5231.5 2.18 8876.8 21.8
8922.7 5243.6 2.40 8925.2 21.8
8971.1 5255.8 2.08 8973.6 21.8
9019.5 5267.9 2.26 9022.0 21.8
9067.9 5280.2 1.97 9070.3 21.7
8242.79 N
8288.36 N
8333.92 N
8379.53 N
8425.16 N
3294.41 E
3310.85 E
3327.27 E
3343.53 E
3359.68 E
11495.2 74.69 19.29 5333.7
11545.1 74.91 19.03 5346.8
11595.0 74.81 18.86 5359.8
11644.9 75.50 19.21 5372.6
11694.9 75.69 19.18 5385.0
9116.2 5292.7 3.24 9118.6 21.7
9164.4 5305.8 .67 9166.8 21.7
9212.6 5318.8 .38 9214.9 21.7
9260.8 5331.6 1.54 9263.1 21.7
9309.2 5344.0 .38 9311.4 21.7
8470.76 N
8516.27 N
8561.86 N
8607.48 N
8653.15 N
3375.71 E
3391.52
3407.17 ~
3422.91 E
3438.81 E
11744.8 76.68 19.10 5397.0
11794.7 75.12 18.99 5409.1
11844.7 74.54 18.70 5422.2
11894.6 75.17 18.78 5435.2
11944.5 74.70 19.44 5448.2
9357.7 5356.0 1.99 9359.9 21.7
9406.1 5368.1 3.13 9408.2 21.6
9454.2 5381.2 1.29 9456.4 21.6
9502.4 5394.2 1.27 9504.5 21.6
9550.6 5407.2 1.59 9552.7 21.6
8698.96 N
8744.73 N
8790.34 N
8835.98 N
8881.53 N
3454.71 E
3470.51 E
3486.08 E
3501.56 E
3517.34 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
Page 10
MEASURED.I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL SUBSEA DOGLEG CLOSURE
SECTION DEPTH SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
11994.5 76.04 19.21 5460.8
12044.4 75.46 19.10 5473.1
12094.3 76.46 18.95 5485.2
12144.2 75.64 18.60 5497.3
12194.2 74.74 18.37 5510.0
9598.9 5419.8 2.72 9600.9 21.6
9647.3 5432.1 1.18 9649.3 21.6
9695.7 5444.2 2.02 9697.7 21.6
9744.2 5456.3 1.78 9746.1 21.6
9792.4 5469.0 1.86 9794.3 21.5
8927.12 N 3533.33 E
8972.83 N 3549.21 E
9018.62 N 3565.00 ~
9064.50 N 3580.60
9110.28 N 3595.90 E
12244.1, 74.47 18.23 5523.3
12294.0 76.42 18.61 5535.8
12344.0 75.92 18.77 5547.8
12393.9 71.86 19.38 5561.6
12443.8 75.57 19.46 5575.6
9840.5 5482.3 .60 9842.3 21.5
9888.8 5494.8 3.97 9890.6 21.5
9937.3 5506.8 1.05 9939.0 21.5
9985.2 5520.6 8.22 9986.9 21.5
10033.1 5534.6 7.43 10034.8 21.5
9155.99 N 3611.01 E
9201.83 N 3626.29 E
9247.76 N 3641.82 E
9293.08 N 3657.49 E
9338.28 N 3673.42 E
12493.7 75.22 19.61 5588.2
12543.7 76.08 19.47 5600.6
12593.6 76.18 19.28 5612.5
12643.5 75.50 19.22 5624.8
12693.5 74.19 19.40 5637.8
10081.4 5547.2 .76 10083.1 21.5
10129.8 5559.6 1.74 10131.4 21.5
10178.3 5571.5 .42 10179.9 21.4
10226.7 5583.8 1.37 10228.3 21.4
10274.8 5596.8 2.65 10276.4 21.4
9383.81 N
9429.40 N
9475.12 N
9520.83'N
9566.31 N
3689.58 E
3705.76 E
3721.84 E
3737.80 E
3753.74 E
12743.4 75.08 19.39 5651.0
12793.3 76.01 19.78 5663.5
12843.3 75.75 19.43 5675.7
12893.2 76.10 19.28 5687.8
12943.1 76.20 19.40 5699.8
10323.0' 5610.0 1.78 10324.5 21.4
10371.3 5622.5 2.01 10372.9 21.4
10419.7 5634.7 .86 10421.3 21.4
10468.2 5646.8 .76 10469.7 21.4
10516.6 5658.8 .31 10518.1 21.4
9611.72 N
9657.27 N
9702.89 N
9748.58 N
9794.32 N
3769.72 E
3785.93 -
3802.18 _
3818.23 E
3834.28 E
12993.0 75.63 19.47 5711.9
13043.0 73.85 19.30 5725.1
13092.9 74.67 19.13 5738.6
13142.8 75.17 19.36 5751.6
13192.8 72.94 19.52 5765.3
10565.0 5670.9 1.15 10566.5 21.4
10613.2 5684.1 3.58 10614.6 21.4
10661.3 5697.6 1.67 10662.7 21.4
10709.5 5710.6 1.10 10710.8 21.3
10757.5 5724.3 4.48 10758.8 21.3
9839.99 N
9885.43 N
9930.81 N
9976.32 N
10021.59 N
3850.40 E
3866.38 E
3882.20 E
3898.09 E
3914.07 E
A Gyrodata
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
CASING
ALASKA
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
13242.7 77.23 19.79 5778.2 10805.7
13292.6 76.98 19.71 5789.3 10854.4
13342.5 75.58 19.53 5801.2 10902.8
13392.5 7'6.52 19.32 5813.2 10951.3
13442.4 75.75 19.74 5825.2 10999.8
SUBSEA
DEPTH
feet
D i r e c t i o n a 1 S u r v
DOGLEG CLOSURE .............
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
5737.2 8.61 10807.0 21.3 10067.02
5748.3 .52 10855.7 21.3 10112.82
5760.2 2.83 10904.2 21.3 10158.51
5772.2 1.93 10952.6 21.3 10204.21
5784.2 1.75 11001.1 21.3 10249.89
Page 11
I Z 0 N TAL
RD I NAT E S
feet
N 3930.29 E
N 3946.74 E
N 3963.03 E
N 3979.14
N 3995.35 E
13492.3 76.32 19.79 5837.2 11048
13542.3 74.49 19.67 5849.8 11096
13592.2 74.47 19.54 5863.1 11144
13642.1 75.46 19.40 5876.1 11192
13692.0 73.94 19.43 5889.3 11241
.2
.5
.6
.8
.0
5796.2 1.15 11049.5 21.3 10295.49
5808.8 3.67 11097.8 21.3 10340.97
5822.1 .25 11145.9 21.3 10386.29
5835.1 2.00 11194.1 21.3 10431.75
'5848.3 3.04 11242.2 21.3 10477.17
N 4011.73 E
N 4028.04 E
N 4044.18 E
N 4060.26 E
N 4076.26 E
13742.0 73.65 19.54 5903.2 11288
13791.9 73.87 19.80 5917.2 11336
13841.8 74.34 20.34 5930.8 11384
13891.8 74.83 20.36 5944.1 11433
13941.7 75.70 20.35 5956.8 11481
.9
.9
.9
.0
.3
5862.2 .62 11290.1 21.3 10522.37
5876.2 .67 11338.0 21.2 10567.51
5889.8 1.40 11386.1 21.2 10612.62
5903.1 .98 11434.2 21.2 10657.75
5915.8 1.74 11482.5 21.2 10703.02
N 4092.26 E
N 4108.39 E
N 4124.87 E
N 4141.61 E
N 4158.41 E
13991.6 76.23 19.94 5968.9 11529
14041.6 76.64 19.63 5980.6 11578
14091.5 76.25 19.84 5992.3 11626
14141.4 75.75 19.77 6004.4 11675
14191.3 76.44 19.04 6016.4 11723
.7
.3
.8
.3
.7
5927.9 1.33 11530.9 21.2 10748.49
5939.6 1.02 11579.4 21.2 10794.16
5951.3 .88 11627.9 21.2 10839.85
5963.4 1.01 11676.4 21.2 10885.43
5975.4 1.98 11724.8 21.2 10931.14
N 4175.09 E
N 4191.52 ~
N 4207.91
N 4224.32 E
N 4240.42 E
14241.3 75.74 18.79 6028.4 11772.2
14291.2 77.50 18.63 6040.0 11820.7
14341.1 76.26 18.35 6051.3 11869.3
14391.1 74.79 18.20 6063.8 11917.6
14441.0 75.96 18.00 6076.4 11965.9
5987.4 1.48 11773.2 21.2 10976.99
5999.0 3.54 11821.8 21.2 11023.00
6010.3 2.54 11870.3 21.2 11069.11
6022.8 2.96 11918.6 21.2 11115.02
6035.4 2.38 11966.9 21.1 11160.94
N 4256.13 E
N 4271.71 E
N 4287.14 E
N 4302.30 E
N 4317.30 E
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366
A Gy r o d a t a D i
cASING
ALASKA
r e c t i o n a 1
Survey
Page 12
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL SUBSEA
SECTION DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
14490.9 76.00 17.79 6088,5
14540.8 75.40 17.74 6100.8
14590.8 76.41 17.79 6113.0
·
14640.7 75.87 17.71 6.124.9
14690.6 75.98 17.92 6137.1
12014.3 6047.5
12062.6 6059.8
12111.0 6072.0
12159.4 6083.9
12207.8 6096.1
.42 12015.2 21.1
1.21 12063.5 21.1
2.03 12111.9 21.1
1.09 12160.3 21.1
.46 12208.6 21.1
11207.04 N 4332.19
11253.11 N 4346.95
11299.23 N 4361.73
11345.39 N 4376.51
11391.50 N 4391.32
E
E
14740.6 75.19 17.71 6149.5
14790.5 74.60 17.53 6162.5
14840.4 76.21 17.66 6175.1
14890.4 75.35 17.68 6187.4
14940.3 76.78 17.48 6199.4
14990.2 75.65 17.35 6211.3
15040.1 76.00 17.56' 6223.5
15090.1 75.13 17.58 6236.0
15140.0 75.62. 17.35 6248.6
12256.1 6108.5
12304.2 6121.5
12352.5 6134.1
12400.8 6146.4
12449.2 6158.4
12497.7 6170.3
12546.0 6182.5
12594.3 6195.0
12642.6 6207.6
1.63 12256.9 21.1
1.23 12305.0 21.1
3.23 12353.2 21.0
1.72 12401.5 21.0
2.89 12449.9 21.0
2.28 12498.3 21.0
· 81 12546.6 21.0
1.74 12594.9 21.0
1.08 12643.1 21.0
11437.54 N
11483.48 N
11529.54 N
11575.66 N
11621.85 N
11668.12 N
11714.30 N
11760.40 N
11806.48 N
4406.12 E
4420.71 E
4435.31 E
4450.00 E
4464.64 E
4479.15 E
4493.67 E
4508.27 E
4522.77 E
Final Station Closure' Distance: 12643.12 ft Az: 20.96 deg.
A Gyro da t a D i r e c t i o na i Survey
for
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7" CASING
Location: , MILNE POINT, ALASKA
Job Number: AK1096C366SS
Run Date: 16-0ct-96 17:01~:15
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub'sea Correction from Vertical Reference: 41 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 20.420 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
AGyrodata Di
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7" CASING
Location: MILNE POINT, ALASKA
!
Job Number: AK1096C366SS
r e c t
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH DEPTH SECTION SEVERITY
feet deg. deg.. feet feet deg./
100 ft.
-41.0 0.00 0.00 0.0 0.0 0.00
o n a 1
CLOSURE ~il
DIST. AZIMUT~
feet deg.
0.0 0.0
0.00 N 0.00 E
(0'- 15140') A GYRO MULTISHOT SURVEY IN 7" CASING
MEASURED DEPTHS ARE REFERENCED'TO THE ORIGINAL R.K.B.
OF 41 FT.
ELEVATION.
100.0 .36 82.09
200.0 .84 120.15
300.0 1.06 97.79
400.0 2.04 77.50
500.0 2.83 81.39
141.0 .2 .
241.0 .2 .
341.0 .2 .
441.0 1.4 1.
541.0 3.6 .
30
65
69
15
88
.5 82.5
1.5 100.6
3.2 106.3
5.9 96.2
10.4 88.7
.06 N .41 E
.33 S 1.30 E
.82 S 2.77 E
.49 S 5.39 E
.44 N 9.55 E
600.0 3.90 67.61
700.0 5.68 56.27
800.0 8.14 48.06
900.0 11.14 44.79
1000.0 12.74 44.74
641.0 7.1 1.
741.0 13.5 2.
841.0 23.9 2.
941.0 39.2 3.
1041.0 58.4 1.
48
O0
63
O1
54
16.3 82.9
24.7 75.1
36.7 67.0
53.5 60.2
74.3 55.6
1.98 N 15.10 E
6.10 N 22.32 E
13.69 N 31.70 E
25.47 N 43.89 E
40.49 N 58.76 E
1100.0 14.08 43.61
1200.0 15.55 42.10
1300.0 18.01 38.13
1400.0 20.76 32.72
1500.0 20.85 30.08
1141.0 80.3 1.
1241.0 104.7 1.
1341.0 133.0 2.
1441.0 166.9 3.
1541.0 204.2 .
34
47
66
11
91
97.4 52.7
122.9 50.5
151.5 48.4
218.5 45.9
253.6 43.5
57.58 N 75.36 E
76.95 N 93.31 E
99.95 N 112.63 E
128.64 N 132.91 E
161.09 N 152.65 E
1600.0 21.65 28.93
1700.0 23.44 25.78
1800.0 26.27 22.69
1900.0 30.53 21.20
2000.0 34.58 19.96
1641.0 242.6 .
1741.0 283.9 2.
1841.0 330.1 2.
1941.0 383.2 4.
2041.0 446.6 4.
86
01
93
4O
16
290.3 41.4
329.7 39.5
373.3 37.5
397.2 35.4
476.4 33.4
194.96 N 171.79 E
231.90 N 190.79 E
274.23 N 209.64 E
323.34 N 229.68 E
382.75 N 251.97 E
A Gyro da t a D i r e c t i ona I Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366SS
CASING
ALASKA
Page
SUBSEA I N C L AZIMUTH
DEPTH
feet deg. deg.
VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH SECTION SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2100.0 38.59 19.84
2200.0 41.48 20.49
2300.0 46.05 21.38
2400.0 '50.72 21.63
2500.0 54.91 21.26
2141.0 520.9 2.73 535.6 31.5
2241.0 604.7 2.59 631.2 30.0
2341.0 699.9. 3.89 735.7 28.8
2441.0 812.4 3.24 849.2 27.8
2541.0 945.0 2.26 969.5 26.9
452.60 N 277.23 E
531.28 N 306.08 E
620.15 N 340.20 E
724.85 N 381.51 E
848.31 N 429.86 E
2600.0 59.49 21.11
2700.0 62.48 22.09
2800.0 69.42 21.40
2900.0 69.34 21.37
3000.0 68.50 21.95
2641.0 1100.6 1.71 1138.4 26.1
2741.0 1283.1 2.33 1314.1 25.4
2841.0 1505.0 2.46 1543.2 24.9
2941.0 1769.9 .17 1776.5 24.3
3041.0 2043.5 2.94 2057.9 23.9
993.49 N 485.90 E
1163.36 N 552.62 E
1369.37 N 635.49 E
1616.76 N 730.20 E
1871.34 N 830.48 E
3100.0 68.74 21.88
3200.0 69.94 22.27
3300.0 69.77 21.84
3400.0 70.44 21.33
3500.0 70.22 22.58
3141.0 2297.6 .97 2337.0 23.7
3241.0 2566.5 .35 2571.5 23.6
3341.0 2839.7 1.42 2853.1 23.4
3441.0 3124.7 1.37 3136.1 23.3
3541.0 3404.1 1.49 3418.4 23.1
2106.84 N 926.22 E
2356.20 N 1027.18 E
2609.43 N 1129.95 E
2874.42 N 1235.13 E
3134.17 N 1338.17 E
3600.0 69.87 22.28
3700.0 70.31 22.18
3800.0 68.32 21.50
3900.0 69.65 22.42
4000.0 70.19 22.79
3641.0 3678.9 .95 3700.3 23.1
3741.0 3960.7 .77 3983.1 23.0
3841.0 4231.4 .83 4256.9 22.9
3941.0 4488.0 4.21 4536.3 22.9
4041.0 4753.9 1.65 4770.0 22.9
3388.36 N 1443.06 E
3649.19 N 1550.12 E
3900.82 N 1650.04 E
4139.21 N 1745.25 E
4384.55 N 1848.46 E
4100.0 69.88 22.17
4200.0 69.15 21.92
4300.0 69.50 22.07
4400.0 69.17 22.29
4500.0 72.01 21.42
4141.0 5035.2 2.06 5052.3 22.8
4241.0 5298.4 1.40 5332.3 22.8
4341.0 5562.7 1.37 5612.4 22.7
4441.0 5820.5 .94 5845.1 22.7
4541.0 6096.5 2.08 6127.0 22.7
4644.67 N
4889.05 N
5134.67 N
5373.48 N
5629.34 N
1955.95 E
2053.89 E
2151.72 E
2249.08 E
2352.86 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: F-PAD #MPF-66A, 7"
Location: , MILNE POINT,
Job Number: AK1096C366SS
cASING
ALASKA
Page
SUBSEA I N C L AZIMUTH
DEPTH
feet .deg. deg.
VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH SECTION SEVERITY DIST. AZIMUTH
feet feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4600.0 74.88 20.23
4700.0 75.83 20.68
4800.0 74.98 20.08
4900.0 75.54 19.17
5000.0 73.83 19.02
4641.0 6467.7 1.27 6512.9 22.6
4741.0 6839.1 2.38 6850.0 22.4
4841.0 7212.9 2.58 7235.6 22.3
4941.0 7592.9 1.99 7621.5 22.2
5041.0 7969.0 4.95 8006.7 22.1
5976.72 N 2483.56 E
6325.15 N 2612.14 E
6675.05 N 2743.69 E
7033.21 N 2871.00 E
7388.74 N 2993.81 E
5100.0 74.27 18.91
5200.0 74.79 19..55
5300.0 74.81 19.14
5400.0 74.96 19.07
5500.0 76.20 18.68
5141.0 8369.8 4.17 8393.9 21.9
5241.0 8752.3 1.64 8780.1 21.8
5341.0 9143.1 1.80 9166.8 21.7
5441.0 9523.8 1.41 9552.7 21.6
5541.0 9909.8 2.71 9939.0 21.5
7767.53 N
8127.93 N
8496.17 N
8856.23 N
9221.75 N
3125.20 E
3253.50 E
3384.54 E
3508.58 E
3633.02 E
5600.0 74.40 19.40
5700.0 74.76 19.17
5800.0 75.77 19.75
5900.0 74.72 20.36
6000.0 77.39 18.60
5641.0 10286.5 2.44 10324.5 21.4
5741.0 10670.1 1.57 10710.8 21.4
5841.0 11062.8 1.91 11097.8 21.3
5941.0 11421.7 1.08 11434.2 21.2
6041.0 11825.1 3.45 11870.3 21.2
9577.26 N
9939.17 N
10309.22 N
10647.16 N
11027.20 N
3757.59 E
3885.12 E
4016.66 E
4137.69 E
4273.12 E
6100.0 75.73 17.85
6200.0 75.33 17.49
6207.6 75.62 17.35
6141.0 12223.0 .83 12256.9 21.1
6241.0 12613.6 1.48 12643.1 21.0
6248.6 12642.6 1.08 12643.1 21.0
11406.03 N
11778.83 N
11806.48 N
4395.99 E
4514.07 E
4522.77 E
Final Station Closure: Distance: 12643.12 ft Az: 20.96 deg.
gyro/data
_4. QUALITY CONTROL
SR366.DOC
gyro/data
QUALITY CONTROL REPORT
. JOB NUMBER' AK1096C366
TOOL NUMBER'
MAXIMUM GYRO TEMPERATURE'
~
MAXIMUM AMBIENT TEMPERATURE '
750
82.43 C
39.5 C
MAXIMUM INCLINATION'
77.50
AVERAGE AZIMUTH ·
20.96
WIRELINE REZERO VALUE '
REZERO ERROR / K'
-2
.O4
CALIBRATION USED FOR FIELD SURVEY'
1534
CALIBRATION USED FOR FINAL SURVEY '
1534
PRE JOB MASS BALANCE OFFSET CHECK '
.46
POST JOB MASS BALANCE OFFSET CHECK~ '
CONDITION OF SHOCK WATCHES
.17
USED 0.0
UPON ARRIVAL AT RIG ·
OK
UPON COMPLETION OF SURVEY'
OK
UPON RETURN TO ATLAS
OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
FI ELD SURVEY 15200 75.62 17.35 6294.5 11824.3 4529.5
FI NAL SURVEY 15140 75.62 17.35 6248.6 11806.48 4522.776
010
SR366.DOC
gyro/data
SR366.DOC
gyro/data
FUNCTION TEST
JOB NUMBER' AK1096C366
5 Survey stations were 'colleCted at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
6010 70.13 70.13 70.13 70.13 70.13
AZIMUTH
M.D. ff I 2 3 4 5
6010 22.34 22.35 22.41 22.31 22.30
SR366.DOC
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR366.DOC
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK1096C366
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. '/50
GYRO SECTION A0119
DATA S ECTI O N C0002
POWER SECTION C0001
BACKUP
TOOL No. 712
GYRO SECTION A0126
DATA SECTION C0025
POWER SECTION C0026
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0153
A0074
A0079
A0071
A0122
A0074
A0029
A0035
WIRELINE COMPANY:
ATLAS WIRELINE
CABLE SIZE: 15/32"
RUNNING GEAR
2.5" W/3" HEATSHIELD,4.5" CASING ROLLERS
TOTAL LENGTH OF TOOL: 33.5 FEET
MAXIMUM O.D.:
4.5 INCHES
TOTAL WEIGHT OF TOOL:
290 POUNDS
SR366.DOC
gyro/data
CHRONOLOGICAL REPORT
JOB NUMBER: AK1096C366
10/16/96
12:30
14:30
15:15
17:45
17:50
18:10
22:00
TRANS TO LOCATION
ARRIVE AT LOCATION
MU TOOL
TOOL WORKING, STANDBY
PU TOOL, MU PUMPIN SUB RIH.
0' STRT.INRUN
15140' STRT OUTRUN
10/17/96
00:00
01:30
04:50
BD. TOOL RD. ATLAS
ARRIVE AT ATLAS
RTN. TO RIG W / SURVEY.
SR366.DOC
WELL LOG TRANSt~HTTAL
To:
State of Alaska April 16, 1997
Alaska Oil and Gas Conservation Comm.
Attn.' Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501 ~(0"
1MWD Formation Evaluation Logs - MPF-66, MPF-66A & MPF-66 PB 1 AK-MM-60110
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
3 LDWG formatted Discs with verification listing.
APl#: 50-029-22697-00, 50-029-22697-01 & 50-029-22697-70
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
Stat ........ f Alaska
Alas,,~ Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
02-Nov-96
Transmittal of Final Prints. Please sign and return copy to'
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
[Well Name
MPF-66 ,~
Services
GR/CCL SET SERVICE
Bluelines
R/F Sepia
Film
-F~ceiv-ed b~-'-' I
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
State of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Howard Okland
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
19-Oct-96
i:.Well Name Services Bluelines R/F Sepia Film {'
iMPF-66 A rGR/CCL 1 1 O i
!iMPF-66 A STATIC PRESSURE 1 1 O~
i .
! MPF-66 A GR/CCL PERF 1 1 0
IiMPF-58 GR/CCL SET SRVS 1 1 0
,MPF-58 GR/CCL PERF 1 1 0
i MPF-58 GR/CCL 1 1 0
,.MPF-58 GR/CCL PERF 1 1 0
i!MPF-58 PDK/GR/CCL 1 1 0
i!MPF-58 GR/CCL PERF 1 1 0
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: David Johns,~;~t~ DATE:
Chair~
THRU: Blair Wondzell,-,~'~ FILE NO:
P. l. Supervisor
FROM: Doug Amos,'i~;,~.~j, SUBJECT:
Petroleum InspeCtor
September 22, 1996
owohiudd.doc
Confidential: Yes _, No_X,
Attachment Only .
Fish Cement Plug
BPX MPU MPF-66A
PTD 96-0162
Saturday, September 21,,1996: I traveled to BPX MPU MPF-66A well Nabors
Rig 22E to witness the tagging of the cement plug set above the 9 5/8" casing
shoe.
The rig had experienced pipe sticking while drilling the 8 1/2" portion of the hole
and lost the BHA. The BHA was cemented and then a second plug set across
the 9 5/8" casing shoe. This 15.8 PPG cement plug was tagged with 20,000~ of
drillstring weight at 7, 945' (9 5/8" csg. shoe @ 8,223'). The drilling program
called for drilling below the shoe and the kicking off to a new bottom hole
location,
SUMMARY: I witnessed the successful tagging of the kick off cement plug set at
7,945' on BPX MPU MPF-66A well on Nabors Rig No. 22E.
Attachment: BPX Morning Drilling Report (9118-9121196)
Morning Drilling Report
till · _.. III
Operator 13 P ~,ploration
Field Miln~ Point
Depth hmtrmnent Type
m)
15~9~,7 MWD - Statkl~rd (declination corrected)
...... Illlll
Well MP[L66 Report 3, page 2
RiX Nabots 22[{ Da(e 06:00, 18 Sop 96
A~Jm~lth ~urvey Type
(deg)
19,02 Singh~ Shot
16,59 Sit~gh: Shot
Coll'l~erlt~ ...: '..
·.
1(X;92.01MWD - StatManl (declinntic)n corrcctcd)
.. .
No,i Head' From
No. 0
.. Coring
· .
'1'~ iDiaml Time i Ret
0 ~ 0 [ 0 i 0
ht¢lhmtloJi
(de~
g 1.40 !
81.'37i
No Accidenls*No Spills* 11'7 Days Since Last LTA
109 Days Sinu(:. I,~,st !,'['1'272 Days Sincc Last Spilt
Fuel Used: 4128 gals,
Fuel l(~ceived; 0 gals,
Water Received: 350 hi)Is,
Currenl Ol~en~lion: (*,irc & wt up,
.....
06;00-06:00
06:00-06:30
06:30
06:30-07:00
(}V t (')0
07: 00,~09: 30
09;30
09:30-11:00
ll:00
i1;0Q-16~0O
16:00
16:00-18;00
18:00
18:00.1@:30
18:30
18:30-18:45
18:45
:[8:45'-00:00
0O:00
00:00-02:00
02:go
02:00-02:3()
02~"JO
02:30--06:00
" Progress Lug
BHA run no. 9
Held safety meeting
PTSM-Working t£ght hole & workitlg ell mud pump fluid
end.
completed o~erat ion~
Wo~'kcd ~uck ViDe at 16350.0 fu
Continue to work [;~pe down. sstabl~.~hed rotation
circ.
Pipe came free
Circuiat~ a~ 16350.0 f~
Circ$ 2 bpm & work up [o 10.5 bDm wh~ie
Obtained clean returns -- 120.00 % hole
R~amed to 16764,0 ft
Wash & roam.
On bottom
circulated ab 16764.0 ft
Pump Lo/Hi sweeps, Circ aroul%d $ 10,5 bpm
to t4 bpm.
HOl~ SWe~t w~h uluu - 150,00 ~ hal.
Pulled out of hole to 16100,0 ft
Got ot~.tck, coming off siipc. Wo~k down ~ free uP,
E~ rotation a circ f/ app .t0 min. Packed
~ ~Rck whilst pipe ~cationarM
Held safety meetin~
PTSM-Revlew all dr{ [1.~.
Con%plet~d opera~ ion~
Held drift (Spill)
OS; 1:25
Com~ [et-d oDoration~
Worked stuck pipe at 1.6165,0 ft
Work pipe down, b%lt $i. owiy lOGE prairies. Down jars
not hi~ing, AttempU ~o jar tip, Jar~ nob hitting.
PuLI up Lo 450k~, pipo r~turned ua work{hq down.
Froed uo,
Circulated at 16165.0 ft
Emk~lish rotation & circ. work c{rc up f/
13 bpm,
0bt~i~lod bottoms up (100% annulu~ volume)
Rea~d ua 1616'/.0 ft
At~Npt to z'OaA% dO~. S~ar~ed packing off agttitl.
Worked ~ree,
Ciz'culated at 16167,0 ft
Mix & pump LO / til, ~w~ep, Circ& wi: up to
60'8 800' ON 0~'i7]: 96,iF_. d3S 89SIF-6S9-Z06'~]I 3E7. S~O~]UN
Operator BP Expluration
Field Milne Point
Morning Drilling Report
WeN MPF-66 Report 31, page 2
Rig Nabors 22I~, Date 06:00, 19 Scp 96
Surveys
Depth
0
To
In~rument Type
Coting
Diem Time
0 0
i Azimuth ; Survey Type
lnellnathm
0 I 0 '
Comments
No Accldcnts~'Nu Spills* 118 Days Since Last LTA
1 t0 Days Since Last U1'I'273 Day,q gince Last SI)ill
Fuel Used: 2905 gals.
Fucl Received: 10007 gal~,
Water Received: 350 bbls,
Injected 190 bbls in MP !-'-'10.
Ctlctent Operation: Pooh to sc{: where back off occurcd.
Progress Log
06:00-.02:00
06:00-06:30
06:30
06;30-08:00
08:00
09:30
09:30-23:00
23:00
23:00-02:00
02:00
02;00-
(12:0(~-04:30
04:30
04;30-
BHA run no, 9
H~ld aafety meetlng
DISCUSSED BACKRF-JiMING.
Completed operations
P%lmped Dug o~ hole to 15900.0 ft
BACERRAM FROM 1~,135-1.$,900. ?ACKED
R~-RSTABLI$~ CIR AND ROTATE.
Began pre~aution&ry measures
Circulated at 15900.0 ft
CIR AND INCREASE P[~P DTROKg$ TO 4-1/2 BDM. PACK£D
OFF AND GOT STUCK.
Got stuck whilst pipe moving
Jarred stuck pipe at 15900.0 ft
ATTEMPT TO JAR PIP~ DOWN TO FI~ FREE SPOT NO
SUCCESS, COULD NOT REGAIN ;uNFf CIR.
Began precautionary measures
Fished a~ 15900.0 ft
PJSM R/U ATLAS AND ATTEMPT TO RUN STRIN~ SHOT
DRILLPIPE . COULD NOT GET BELOW 3900' WITHOUT
PUMPS. R/D ATLAS.
Began precautionary measures
Stuck 5in DrillDipe
Wurked stuck pipe aR [5906.0 ft
'~OOK 21 WRAPS AND 900 AMPS TO BACK OFF PIPE. LOST
20,000~ STRING W~ZIGHT. R/D APR AND ATLAS.
Pumped out of hole to 14000.0 ft Pl.~P PET,f, AND POOH_
SOO'OH 8I:t7; 96,1:~ d3S 89cst;,-6qg-/_o6,ai 355 S:a:IOEIUN
Optrator BP ExpIornt, intl
Icleld Milne Point
.., .
. II __111 ii
Morning Drilling Report
_ _.
Well M Pl:-66PB2
Rig Nabors 22E
!
Illllll I II
.._
tlL.[ _
Report 32, paD.,, :3
Date 06:00, 205~p 96
06: O0-1. O; O0
06:00-06:30
0oe:30
06 ::tO-lO: 00
1.0:00
10:00-10:30
10,00-10:30
10:30
t0;30-12~30
%0:30-12:30
12:30-22:30
12:30-16:00
16:00
1,6;00-18:00
18:00
%8:00-18:15
18:15
18:15-2t:30
21:30-22;30
32;30
22:30-23:00
22:30~23:00
23;00
23:00-04:30
23:00-00:30
00:30
00:30-02:00
02:00
02:00-03:30
03;30
03:30-04:30
04:30
t14~3'0-05:00
· 05:00
05t00.-
05:00-06:00
06
Progroso
S~uck Sin DriL.[plpe
Held ~afegy mootin~
DISCUSSED VISUAG INSPEC'£ION oF DRILL PIPE,
CompleL.d operatJ, onc
Pulled out of hole go 0.0 Et
PIN P~ll. BACKED OFF ~ TIlE gOTTM SECTION OP
SL'f. NGJ,;R~, S~E PLACE TH~ ~[U~V.tOUS BACK OFF WAS MADE.
At B~
Wellhead work
Removed Wear
SERVICE WEAR
Equipment work completed
Planned ~intenance
~erviced ~ron rou,~eck
~JSM. C~IGE OUT ELEVATES z~D ROUGHNECK TO 3-!
hND P/U 35 JTE OF :)-1/2:' 15.5~ DRILL PIPE. SW;TCI{
BACK TO 5 ~.
Eqliip~nt work completed
~un Drillpipe, 5tn O.D.
Ran Drillpipe in stands to ~22~.0 ft
At 9-5/8in casing shoe
Se~iced Block line
PJSM. SLiP ~D CUT DRILl, I,INR, ~]~I~.VICE CEO'S',
B~K~¢, AND TOP DRI~.
Held safety meeti, nfi
D-1 DRILL. 2:00
Completed operations
R~ Drillplpo in s~and~ to 15620.0 f~
F~N TIH TO TOF~ NO PROBLEMS.
Circulated at 15620.0 ft
CIE B/U. NO LOSES.
Obtained bottoms up {100% annulus velum.)
C.m.nt : Abando~ent pltt9'
Mi~ed and Dumped slurry - ~6.00O bbl
PJSH. TEST LINES 3000 PSI. PUMP 20 BBLS WATER,
BBLS 15.8 PPG CMT, 4 }thbLl WATER ~D 244 BBLS MUD.
S~TED BA~CED PLUG.
Tail cement
Pu&t Dr~%lp%pe, 5tn O,D,
Pulled Drillpipo ilz stand~ to 13740,0 f~
R/D CEMENTERS ~D PULL 20 STANDG T0
Circulated at 13740.0
CIE AND COND SUP. NO LOSSES. NO CRI~N'¢ TO SURFACE .
Obtained bott~ up (100% annulus volume)
Pulled Drillpipe in stands to ~950,0 ft
Stopped ; To circulate
Circuia~od at 8950,0 it
SPOT MI ,VIS PIP ~950-8523. P~[{ TO 8523.
Obtained req. fluid proporti.8 100.00 %, hole vol.
Cement : Kickoff plug
Mixed and pu~od ~lurry - 56.000
MIX ~D PImP 10BBL~] WATER, 56 BBLS CLASS "G' AT
lf.5 PPG, 4 BBLB WATER, AND 120 BBbS ~D. SPOT
DAB~CED PLUG.
Tail cement
Pull Drillpipe. 5in O,D.
Pulled Drlllpipo in stand8 to ~100.0 ft
R/D C~NTE~ ~ID ;'(JI,t, 15 ST~S 1.5-2.0 MINUTES
~ I,',R ;gTAND.
Completed 6perations
.......
'~0TM 800'oN 9i:'Fi 96,
Opcrnter B P Explorntion
Fteld Milno Point
Morning Drllltng Report
Well MPF-66PB2
Rig Nai.~.,rs 22E
. IIII I
Relaurt 33, p.',gc '2
Date 06:00, 21 Sep96
06:30
06:30-13:00
13:00
1.3:00-15:00
15:00
15~00 16:30
16:30-20:30
20:30
20:30-03:00
20:30-03:00
03:00
03:00-
04:0C
04:00.06:06
Progress Log
Pu[.l Dr~ill.plpe, 5~.n O.D.
He. ld sat'ety meetinc~
DIS¢:[.;£;S ~:~, ~ P~ AND FALLS,
Completed operations
Ciz'culated a~ 9100,0 ft
CIR B/U Afl'PER PULLING 15 STANDS. PUMP LO/IIX
PILL ~ND DISPLACE WELL WI~H b~INl3 M{}~) A~[~ 10 DP3~, CbE~D
Obtaln~ req, fluid properties 100 ~ O0 %, hole vol .
POOH TO 3-1/2" DRILL PIPE.
Sto~ped : To changu handlin~
Laid down 1082.0 ft of DrLLiDiDe
PJSM. R/U AN[] f,/D 35 JTS 3-1/2" DRILL PIPE.
Comp [eted operations
Test well control oquip~txent
Tostud BOP ~tack
PJ~. R/U AND 'Iq.]ST POPE , SOUG ~OS WAIVED
WI~ESSiNG T~SI'. ~NULAR PREVENTER LEAKED,
Annxl'l. ar prever~tor failed - Abort
Repair
Repa{red Annular prcven~oz'
PJSM. N/D FLOWLINZ ~D PITCHER NIPPLE. CHANGE OORT
RL~RN'i~ iN ~NNULAR ~ RE-TEST S~4E OK. N fPP[,H
Fr,OWF,[NE AND /NSTAL5 WEAR RING.
Equipment work comt~[eted
BHA run no, ~0
R{~Ged UD Drillscri}l~3 handling uqt:ipm~nt
~3WITCH ELEVA't~)R~ TO 5" ~,~D LOAD BHA.
Equipment work complot~d
Made up BID% no. 10
PJSM. ~E UP BHA
. .
...
7_.,O'd 800'OH_qI:tTi 96,'[~,... cl3S S9StT-6S9-Z_O6:[IT.,. 357~ S~O.gldN
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
September 20, 1996
Tim Schofield, Senior Dflg Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re;
Milne Point Unit MPF-66A
BP Exploration (Alaska) Inc.
Permit No. 96-162
Sur. Loc 2165'NSL, 2608'WEL, Sec. 6, T13N, R10E, UM
Btmhole Loc. 1055'NSL, 2173'WEL, Sec. 20, T14N, R10E, UM
Dear Mr. Schofield:
Enclosed is the approved apphcation for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
David W.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION Cu~vlMISSION
PERMIT TO DRILL
2O AAC 25.005
[] Drill [] Redrill IlL' Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 42' Milne Point Unit / Kuparuk River
3. Address 6. Property Designation Sands
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355016
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2165' NSL, 2608' WEL, SEC. 6, T13N, R10E Milne Point Unit
At top of productive interval 8. Well Number Number 2S100302630-277
783' NSL, 2276' WEL, SEC. 20, T14N, R10E MPF-66A
At total depth 9. Approximate spud date Amount $200,000.00
1055' NSL, 2173' WEL, SEC. 20, T14N, R10E 09/20/96
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 355017, 1055'I No Close Approach 2560 18699' MD / 7712' TVD
16. To be completed for deviated wells i17. Anticipated pressure (see 20 AAC 25.035 (e)(2)}
Kick Off Depth 8223' Maximum Hole Angle 75.74° Maximum surface 2977 psig, At total depth (TVD) 7458' / 3723 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 Btrc 18669 30' 30' 18699' 7712' 227 sx Class 'G'
i19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured) "
true vertical feet ORIGINAL
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate RFCEIVED
Production
,~ Liner ,~ I.~ ? 2 0 ~.,q 9 ~
/"lj Alaska. 0il & G~s Cons. Commission
Perforation depth: measured ¢'~:~ ....
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: James Robertson, 564-5159 Prepared By Name/Number: Kathy Campoamor, 564-5122
21. I hereby certify that the foregoing is true and ,'orrect to the best of my knowledge
Signed ,,...?~ ..... ~,~~~J /2_O/~
Tim Schofield / ~ Title Senior Drilling Engineer Date ~
Commission Use Only·
Permit Number I APl Number I ^~°w' ~ I ~ c°vor'o~o~
¢4~'-,,,/.-----~.2.. 50-4:~.~--~-- .~___..,~.~'~/,~,C:~ [ ~/7...~,,~/~.- for other requirements
Conditions of Approval:Samples Required [] Yes '~ No Mud Log Required [] Yes ~ No
H d If M '
y rogen Su ide easures /~'Yes [] No Directional Survey Required ~-Yes [] No
Required Working Pressurefor'BOPE [] 2M; []3M; r~ 5M; [] 10M; [] 15M
Other: ,~: '.,:,i~i! btl~F~(~ ~y by order of
Approved By i')avid w, ,Johnston Commissioner the commission Date
Form 10-401 Rev. 12-01-85
Submit In Triplicate
Shared
Services Drilling
I Well
Contact: James E. Robertson
Name: IMP F-66A I
Well Plan Summary
564-5159
JType of Well (producer or
injector)'
IKUPARUK
PRODUCER
JSurface Location'
Target Location'
Bottom Hole
Location'
2165 NSL 2608 WEL Sec 06 T13N R10E UM., AK
783 NSL 2276 WEL Sec 20 T14N R10E UM., AK
1055 NSL 2173 WEL Sec 20 T14N R10E UM., AK
I AFE Number: 1337025
IEstimated Start 20SEP96
Date'
I Rig: I Nabors 22-E
IOperating days to 115
complete:
MD:
Well Design:
IMilne Point Ultra Slimhole Longstring 9-5/8", 40# Surface
7", 26# Longstring
Formation Markers:
Formation Tops MD TVD (bkb)
base permafrost 1,8 41 1,79 2
NA 6,732 3,982 Top of Schrader Bluff Sands (8.3 ppg)
SeabeeShale 8,059 4,442 Base of Schrader Bluff Sands (8.3 ppg)
HRZ 1 7,71 8 7,026 High Resistivity Zone
Top Kuparuk 1 8,0 40 7,246 Kuparuk Cap Rock
Target Sand -Target 1 8,2 89 7,462 Target Sand (9.6 ppg)
Total Depth 1 8,6 99 7,71 2
Casing/Tubing Prollram:
Hole (~sg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD
8- 1/2" 7" 2 6 # L-80 btrc 18669 30/30 18699/771 2
Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur
with a full column of gas to the reservoir at +7458' TVDSS. Maximum anticipated surface pressure in
this case assuming a reservoir pressure of 3723 psi is 2977 psi, well below the internal yield
pressure rating of the 7" casing.
Logging Program:
Open Hole Logs:
Surface
MWD Directional sudace to TD.
Intermediate N/A
Final
Cased Hole Logs:
MWD Directional and LWD (GR/RES).
N/A
Mudloggers are NOT required for this well.
Mud Program:
I Special design I None-SPUD MUD
considerations
Surface Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 50 15 8 10 9 8
to to to to to" to to
9.0 1 50 35 1 5 30 1 0 1 5
Intermediate Mud Properties: N/A I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel ~lel Loss
Production Mud Properties: I LSND
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel ~lel Loss
9.0 40 1 0 3 7 8.5 6 - 8
to to to to to to to
10.0 50 1 5 1 0 20 9.5 4-6
I
Well Control: "
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will
be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
IKOP: 18223'
IMaximum Hole Angle:
Close Approach Well-
175'74°
Disposal:
Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. The Milne Point reserve pit
can be opened in emergencies by notifying Karen Thomas (564-4305) with request.
1. The base of the Permafrost for all wells located in the Milne Point Unit is _+1,800' TVD. Aquifers in
the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer
Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or
industrial use water wells located within one mile of the project area.
2. There are _+26 wells on Milne Pt. 'F' Pad. There may be additional unidentified wells within one
quarter mile distance from the subject well. There are no domestic or industrial water use wells
located within one mile of the project area.
3. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES".
4. The cement design for this well ensures that annular pumping into hydrocarbon zones will not
occur.
MP F-66A
Proposed Summary of Operations
..
9-5/8", 40#, L-80, BTC casing is set at 8,223' md/4,505' TVD.
Verbal approval was obtained from B. Wondzell with AOGCC to abandon the MP F-66 wellbore and spot a
SIDETRACK kickoff plug as outlined below. The verbal approval was given on 19,MA'Y96 at _+2000 hrs
in a phone conversation with J. E. Robertson of BPXA Shared Services Drilling. 5,¢'P
,
,
.
.
o
.
,
.
RIH with backoff shot as deep as possible above stuck point and backoff pipe. If unable to get
backoff tool down to adequate depth perform blind backoff. POOH.
PU muleshoe and 1000' of 3-1/2" drillpipe. RIH on 5" drillpipe to TOF at _+15,485'
md/7,002' TVD. Circulate and condition hole for cement plug. Spot 32 bbl balanced cement
plug. Slowly pull out of cement plug. At 15 stands above the plug rig up and circulate slowly
down the drillpipe 1 drillpipe volume. MONITOR RETURNS. IF NO LOSSES ARE ENCOUNTERED
CONTINUE CBU THE LONG WAY. IF LOSING FLUID SHUTDOWN.
NOTE: Volume based on 8-1/2" hole from TOF to 350' above TOF + 30%.
PREMIUM G + 0.20% HALAD 344 + 0.20% CFR3 + HR5 AS NECESSARY
WT: 15.8 PPG
YIELD: 1.15 FT3/SK
..
Continue POOH to 8,950' md. Spot 30 bbl high visc mud pill (weight of pill at current mud
weight). Continue POOH to 8,523' md. Spot 55 bbl balanced cement plug. Slowly pull out of
plug. At 15 stands above the plug rig up and circulate slowly down the drillpipe 1 drillpipe
volume. MONITOR RETURNS.
IF NO LOSSES ARE ENCOUNTERED DISPLACE WELL TO LSND SYSTEM IF PRACTICAL. IF LOSING
FLUID SHUTDOWN. POOH LD muleshoe.
NOTE: 9-5/8" shoe is at 8,223' md. Volume based on 300' of 8-1/2" open
hole +50% + 200 ft inside 9-5/8", 40# casing.
PREMIUM G + 0.2% CFR-3
WT: 16.5 PPG
YIELD: 1.05 FT3/SK
Test BOPE.
MU bit on a motor, with Directional MWD and LWD CDR (GR/RES). RIH to 8,100' md. Begin
wash and ream until tag cement. Drill cement to 8,223' md.
NOTE: Indicate on morning report "TAG WEIGHT".
Circulate and condition mud at 8,223' md before begin"sidetrack.
Drill 8.5" hole to TD as per directional plan. Run and Cement 7" Casing. Displace cement with
seawater and enough diesel to cover from the base of permafrost to surface.
Test casing to 3000 psig.
9. ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well.
DRILLING HAZARDS AND RISKS:
Seethe updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F
pad and review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due
to equipment mechanical problems with the surface equipment, rather than formation drilling
problems.
The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after
the rig drills and completes them. This will make the near rig area congested and as a result
potentially hazardous. Ensure personnel use caution moving around adjacent production activities.
Close Approach:
NONE
Lost Circulation:
There has not been any appreciable amount of lost circulation in surface hole on any of the F Pad
wellls to date.
Stuck Pipe Potential:
The original MP F-66 wellbore as well as the first sidetrack of the MP F-66 wellbore both
experienced stuck pipe incidents whereby bottom hole assemblies were forced to be left in the
ground and cemented over. The first incident occured at a bit depth of 15,950' md with a top
stabilizer depth of +15,836' md/7,122' TVD(angle @ +70°). The string was stuck while POOH.
Eventually the ability to rotate, circulate or reciprocate were all lost. This wellbore was plugged
back to +14,675' md.
This wellbore was sidetracked and drilled to a depth of 14,674' md. While POOH during a short
trip this drillstring was stuck at a bit depth of 16,006' md with a top stabilizer depth of
+15,892' md/7,160' TVD (angle @ +68°). Once again the ability to rotate, circulate or
reciprocate were all lost and this wellbore is to be plugged with 350' of cement on top of the bha
which is left in the wellbore as well as a cement kickoff plug that extends from 300' below the 9 -
5/8" casing shoe at 8,223' md up to 200' inside the 9-5/8" casing.
ALTHOUGH THE WELL IS TO BE SIDETRACKED AGAIN AND DESIGNED SUCH THAT
7000' TVD TO 7200' TVD RANGE WILL BE PENETRATED AT ANGLES OF 50° TO 45 °
EXTREME CAUTION SHOULD BE USED IN THIS INTERVAL.
Formation Pressure:
The maximum expected pore pressure for this well is 9.6 ppg EMW (3,725 psi @ 7,458' TVD). There
has been no injection in this region, therefore the reservoir pressure should not exceed this estimate.
MP F-66A Well
7" PRODUCTION CASING
CEMENT PROGRAM- HALLIBURTON
STAGE I CEMENT JOB ACROSS THE KUPARUK INTERVAL:
CIRC. TEMP: 140° F
BHST 170° F at 7040' TVDSS.
SPACER: 20 bbls fresh water
70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above
current mud weight.
CEMENT TYPE- Premium G
ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344
WEIGHT: 15.8ppg
APPROX # SACKS: 227
YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk
THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F
FLUID LOSS: < 50cc/30 min @ 140° F
FREE WATER: 0cc @ 45 degree angle.
CENTRALIZER PLACEMENT:
,
.
7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 19 joints of 7"
casing (38). This will cover 300' above the KUPARUK 'C' Sand.
Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the
9-5/8" casing shoe.
OTHER CONSIDERATIONS:
Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement.
Displace at 8-10 bpm. Batch mixing is not necessary.
CEMENT VOLUME:
,
Stage 1 cement volume is calculated to cover 1000' md above the Kuparuk 'C' Sand with
30% excess.
Anadrill Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING
Well ......... : MPF-66(P19)
Field ........ : MILNE POINT,F-PAD
Computation..: Minimum Curvature
Units. ....... : FEET
Surface Lat..: 70.50822297 N'
Surface'Long.: 149.65674417 W
LOCATIONS - ALASKA ZOne: 4
X-Coord Y-Coord
Legal Description
Surface ...... : 2164 FSL 2609 FEL S06 T13N R10E UM 541952,89 6035617.47
Tie-in/KOP.~.: 2372 FSL 375 FEL S31 T14N R10E UM 544133.88 6041116..50
TARGET ....... : 783 FSL 2276 FEL S20 T14N R10E UM 547427.00 6050108.00
BHL. ......... : 1055 FSL 2173 FEL S20 T14N R10EUM 547526.68 6050380.44'
ANADRILL
Prepared ..... : 09/18/96
Vert sect az.: 20.42
KB elevation.: 41.90 ft
Magnetic Dcln: +27.909 (E)
Scale Factor.: 0.99990200
Convergence..: +0.32358406
AKA-DPC
APPROVED
SEP 19 1996
'U
-' I
I
O
ee
(
PROPOSED WELL PROFILE
STATION MEAS INCLN DIRECTION VERT-DEPTHS SECT
IDENTIFICATION DEPTH ANGLE
TIE- IN
Kop/ctmv~ 3/lOO
~ 3/ioo L~]R~
8184 68.25
8223 67.81
8300 70.10
8400 73.08
8490 75.74
COORDINATES-FROM STATE- PLANE TOOL DL/
AZIMITFH TVD SUB-S DIST WE~ X Y FACE 100
21.76 4492 4450 5914 5487.16 N 2.212.23 E 544133.88 6041116.50 149L <TIE
21.48 4506 4465 5951 5521.15 N 2225.70 E 544147.16 6041150.56 7L 1.30
21.16 4534 4492 6023 5588.09 N 2251.82 E 544172.90 6041217.64 7L 3.00
20.77 4566 4524 6117 5676,68 N 2285.76 E 544206.34 6041306.42 7L 3.00
20.42 4590 4548 6204 5757.45 N 2316.11 E 544236.22 6041387.34 3 00
DROP 3/100
16893 75.74
16900 75.54
17000 72.54
17100 ...69..54
17200 66.54
20.42 6659 6618 14349 13390.54 N 5157.95 E 547034.63 6049035.62 LS 0.00
20.42 6661 6619 14355 13396.56 N 5160.19 E 547036.84 6049041.65 LS 3.00
20.42 6689 6647 14451 13486.66 N 5193.74 E 547069.87 6049131.93 LS 3.00
20.42 ~.6721, 667~ ..,145~6_ ~3575.28 ~, 522~.73~.~ 547%02.36 6049220~73 ,LS .... 3~.00 ......
20.42 6758 6717 14639 13662.19 N 5259.09 E 547134.22 6049307.81 LS 3.00
17300 63.54
20.42 6801 6759 14729 13747.14 N 5290.72 E 547165.37 6049392.93 LS 3.00
(Anadrill (c)96 MPF66P19 3.0b.01 3:51 PM P)
MPF-66 (P19)
sTATIoN
IDENTIFICATION
TItRZ
END 3/100 DROP
MK-19
TKUD'
TKUC
TKUB
TARGET
TKA3
TKA2
TKA1
TMLV
TD
DEPTH
.
17400
17500
17600
17700
17718
17800
17810
17900
17918
17941
18040
18222
18235
18289
18289
18314
18342
18399
18699
INCLN
ANGLE
6O. 54
57.54
54.54
51.54
51.02
48.54
48.24
45.54
45.00
45.00
45.00
45.00
45.O0
45.00
45.00
4.5.00
45.00
45.00
45.00
DIRECTION
AZ IMUTH
20.42
20.42
20.42
20.42
20.42
PROPOSED WELL PROFILE
VERT-DEPTHS SECT
TVD SUB-S DIST
6848 6806 14818
6899 6857 14903
6955 6913 14986
7015 6973 15066
7026 6984 15080
20.42 7079 7037
20.42 7086 7044
20.42 7147 7105
20.42 7160 7118
20.42 '7176 7134
20.42 7246 7204
20.42 7375 7333
20.42 7384 7342
20.42 7422 7380
20.42 7422 7380
15143
15150
15216
15229
15245
COORDINATES - FROM
WELLHEAD
13829.91 N 5321.53 E
13910.27 N 5351.45 E
13988.00 N 5380.39 E
14062.88 N 5408.27 E
14075.74 N 5413.05 E
15315
15444
15453
15491
15491
20.42 7440 7398 15509
20.42 7460 7418 15529
20.42 7500 7458 15569
20.42 7712 7670 15781
14134.70 N 5435.01 E
14141.87 N 5437.68 E
.14203.28 N 5460.54 E
14215.35 N 5465.03 E
14230.25 N 5470.58 E
14295.85 N 5495.00 E
14416.75 N 5540.01 E
14425.18 N 5543.15 E
14460.79 N 5556.41 E
14460.79 N 5556.41 E
14477.66 N 5562.69 E
14496.40 N 5569.67 E
14533.89 N 5583.63 E
14732.69 N 5657.64 E
09/18/96 Page 2
STATE-PLANE
.X Y
547195.71 6049475~87
547225~17 6049556.38
547253.67 6049634.26
547281.12 6049709.29
547285.,83 6049722.18
TOOL
FACE
LS
LS
LS
LS
LS
547307~45 6049781.26 LS
547310.08 6049788.44 LS
547332.59 6049849.98 .LS
547337.0'2 6049862.07
547342.48 6049877.00
547366.53 6'049942.73
547410.85 6050063.87
547413.94 6050072.32
547427.00 6050108.00
547427.00 6050108.00
547433.18 6050124.90
547440.06 6050143.68
547453.80 6050181.24
547526.68 6050380.44
ANADRILL AKA-DPC
APPROVED
SEP l ')!996
DL/
100
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00(
3.00
o.oO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
~0
0~
O
J,
U
O
(Anadrill (c)96 MPF66P19 3.0b.01 3:51 PM P)
Sep-19-96
-o
03:53P Anadrill
DPC 907 344 2160 P.06
SHARED SERVTCES DR];LL T~G
Marker IUenti f 1cat ion
A) TIE-IN
B) KOP/CURVE 3/100
C) END 3/100 CURVE
D) ~ 3/!00
E) END 3/I00 DROP
F) TARGET ~
G) TD
i i u
MD N/S E/W
B~84 5487~N 2316
8223 5521 2226
8490 5757
16893 13392 N
5258
~7918 I42~5 N .5465
tB2B9
~99
$446t N 5555 E
~4733 N 5658 E
ANADRILL AKA-DP(
APPROVED
SEP ). ~; 1996
f4PF-66 (P ~. 9J
PLAN V'rEN
CLOSURE ..... : ~5782 feet at ~.AzJmuth 2~.0~
DECLINATION.: +27.909 (E)
SCALE .......: 1 inch = 2400 feet
DRAWN .......: og/ts/g6
Anadpl 1] SchYuml~erger
Sep-19-96 03:52P Anadrill DPC 907 344 2160 P.05
Marker IUentificatton
A) DRDP 3/100
B) ENO 3/100 DROP
C) TARGET
D) TO
MO BKB SECTN INCLN
16893 6659 14349 75.74
1791B 7160 $5229 45.00
~828g 7422 15491 45.00
18699 77tE t5781 45.00
MPF-66 (Pig)
VERTICAL SECTION VIEW
,i,
Section at: 20.42
TVD Scale.' I inch = 200 feet
.~00 <
14600 14700 t480.0 14go0 15000 15100 ' 15200 15300 t5400 15500 t5600 $5700 {5,aO0 tSgO0 ~6000
Sect ion De -'
(~nm~rill Cc196 l~Pi9 3.0~.0~ 4:02 PN P)
SHARED "' ;ERVTCES
Marker Identification MD BKB SECTN INCLN
_A) TIE-IN 8184 4492 5914 68.25
B) KOP/ClClVE 3/t00 8223 4506 5951 67.8]
C) END 3/100 CURVE 8490 ~t590 6204 75.74
D) DROP 3/JO0 16F193 6659 14349 75.74
E) END 3/100 DROP 17918 7t60 15229 45.00
F) TARGET 18289 7422 '15491 45.00
6) I'D 18699 7712 15781 45,00
-DR'ILEIN
· i
,4nadrJ]] Schlumberger
. MPF-66 (P 19)
VERTICAL SECTION
Section at: 20.42
TVD Scale.' I inch = 2000 feet
Dep Scale · I inch = 2000 feet
Drawn .... · 09/~B/96
............
VIEW
. ·
0 tO00 2000 3000 4000 5000 6000 7000 BO00 9000 10000 11000 12000 13000 14000 i5000 i6000 17000
Sect ion Departure
(Inaori{] {c}96 ~F66PI9 3.~.0! 3:56 PM p}
(
adius 2 ~0 feet )
O~
0
0
Sep-19-96 03:55P Anadrill
DPC 907 344 2160 P.09
Client .............. : BP EXPLORATION
Well Name ....... : MPF-66(P19)
Field ................ : MILNE POINT
County ! Stats..: BEECHEY POINT, ALASKA
APl# ................ : 50-029-96015-00
Anadrill ID# ...... : 500299601 500P1903
Alaska District
Directional Well Planning Department
NORMAL PLANE TRAVELLING CYLINDER RESULTS
INCLUDING ELLIPSES OF UNCERTAINTY
Planned Wall Survey Program
Start End Type Interval
0 8000 MEWD 200
8000 18699 MEWD 93
Date Calculated ..... : 09'/18/96 16:28
Date Plotted .......... : 09~118/96 16:32
KBE ..................... ;! 41.90
Grid X .................. : ~ 541 952,89
Grid Y .................. : ) 6035617.47
Grid Zone ............. : }ASP ZONE 04
MIN. I FLOWING pLuGGED ENTER ENTER J EXiT EXIT CLOSE
OFFSET WELL FLOWING ELLIPSE SURVEY SAFETY SAFE'FY PLUG NO DRILL I NO DRILL' PLUG APPROACH
SAFETY SEP. $EP. MD TVD DIST. DIST. ZONE ZONE : ZON~ ZONE STATUS
SEP. MD MD MD MD
,
Page I of 2
MPF-66PB1(D0' ) -566.0 -490.8 7.0 8423 4573 77.1 21.1 0 0 ~ NO DRILL
MPF-66PB2(D0~ } -568,0 -490.8 7.0 8423 4573 77.1 21.1 0 0 NO DRILL
MPF-74 -131.9 -33.6 936.5 12644 5614 98.2 31.6 9817 10714 13663 13994 NO DRILL
MPF-74 -27.7 21.5 181.7 3924 2998 49.2 9.8 2998 I 4266 PLUG
MPF-96AA(P021 I 5.5 43.8 72.6 1889 1835 28.3 4.7I FLOW
MPF-74(G03) 22.7 63.5 125.8 3081 2672 40.8 7.7i FLOW
M PF-70(G01 ) 13.0 25.3 31.4 824 823 12.4 2.1
FLOW
MPF-70 14.0 26.4 31.0 ' 822 821 12.3 2.1 ;~,NA£ 'RILL'~ 'A ~,A-DP~ FLOW
MPF-78 41.3 61.3 77,1 1339 1324 20.1 3,3 ; FLOW
FLOW
I '
MPF-TO(G01) 46.6 66.3 77.6 1311 1297 i9.7 3.3 , FLOW
MPF-69(G02) i 44.6 61.0 7i.3 1096 1089 16.4 2.7 8EP 'ilo 79~..' FLOW
MPF-S9ii 44.7 61.2 69.7 1097 1091 16.5 2.7.~ FLOW
MPF-SW4(P01)! 43.5 56.4 63.0 858 856 12.9 2.1 /,-bt,,~I ~_,~,, FLOW
MPF-62(G01} ! 23.0 29.3 32.3 420 420 6.3 1.1 ~NI]'IALI'' t., FLOW
M PF-96aB(P02) 60,2 76,7 85.0 1097 1090 16.4 2.7 ........... FLOW
MPF-62 23.8 30.1 32.3 421 421 9.3 1.1 FLOW
MPF-57(PO2) 62.6 76.5 83.4 931 929 14.0 2,3 FLOW
MPF-61 74.1 87.1 96.4 868 867 13°0 2.2 ~' FLOW
IVlPF-59(P05) 53.4 60.4 63.0 472 472 7~ 1 1.2 FLOW
MPF-~W4(P04) $3.S 60.6 63.2 472 '472 7.1 1.2 FI. OW
MPF-58(P06) 53;8 60.9 63.4 474 474 7.1 1.2 , ~ FLOW
MPF-53 116.8 131.8 143.6 1000 996 15.0 2.5 I FLOW
MPF-53(D01 ) 121.2 135.8 142.7 977 973 14.6 2.4 I FLOW
MPF-53OH(D01 ~ 120.7 135.0 141.6 953 950 14.3 2.4I FLOW
MPF-53OH 120.8 136.1 141.6 953 950 14.3 2,4 I FLOW
MPF-54(PO5) 82.5 90.7 93.7 546 546 8.2 1.4I FLOW
MPL-25 915.7 1006.0 1831.8 11064 5225 I 90.3 27.7 FLOW
MPF-96A(P04) :; 146.2 157.0 161.2 718 718 10.8 1.8 ; · FLOW
MPF-96X(P04) j 113.9 120.1 122.3 415 415 6.2 1.0 , FLOW
MPF-96B(P04)j 170.1 179.8 182.2 583 583 8.7 I .5 ; FLOW
MPF-45(D01) 173.2 182.1 185,4 593 593 8.9 1,5 ' FLOW
MPF-45 I 173,9 162.4 185.,5 566 566 8.6 1.4 ' ~ FLOW
MPF-45 (G01 ) 174.7 182.8 186.7 543 543 8.2 1.4, FLOW
MPF-SW4(P03) 208.8 217.9 221.4 611 611 9,2 1.5 ~ FLOW
MPF-96TB(P02) 200.3 208.9 212.1 571 571 8.8 1.4 ~ FLOW
MPL-15 1221.7 1276.4 1809.1. 4463 3189 54.6 I I .2 i~' FLOW
MPF-37 221.6 230.4 236.3 589 589 8,8 1.5 I FLOW
MPF-37(G02) 223.~ 232.3 236.6 589 589 8.8 1.5 FLOW
MPF-46(G01) 145,9 151.1 153.6 351 351 5.3 0.9 ' FLOW
MPF-46 145.6 150.5 152.3 329 329 4.9 0.8 FLOW
MPF-77 133.5 138~0 139.6 299 299 4.5 0.7 FLOW
MPF-77(O02) 133.8 138.2 139.8 296 296 4.4 0.7 i ; ~ FLOW
MPL-24 1769.6 1830.9 2194.4 6255 3462 ! 61,3 13.1 I FLOW
MPF-33(G01) -254.3 262,1 265.9 521 521 ~ 7.8 1.3 ~'~ ~" i';~ ~ ~ , i[:l i"~, FLOW FLOW
MPL-14 't 2215.3 2292.8 2906.8 8516 4597 77.6 21.3 FLOW
MPF-33 257.2 264.6 266.0 497 497 7.4 1.2
,~ ~.i~ .~..~ ~ ~ FLOW
MPF~38(G01) ~ 204. E~ 210.5 213.3 394 394 5.9 1.0 ~;.~ ~= ': '3 ~" FLOW
MPF-22(G01) 319.0 328.1 332.6 605 .605 9.1 1.E FLOW
MPF-22 319.8 328.8 332.3 604 604 9.1 1.6 ~: ~" ?'. '* FLOW
r~ ~ -~ f'. i'~ ~.~ FLOW
MPF-29 281.1 288;9 294.0 620 519 7.8 1.3 ~'~,
MPF-29(D01) 282.9 290.4 293.0 495 495 7.4 I .2 ; FLOW
MPF-25 309.6 317.3 322.4 514 514 7.7 1.3 . . ~ FLOW
MPF-25{G04) 309.8 317.1 320.7 489 489 ~ 7.3 1}~, .~.~ ~ [,,.~
,~... ;.';, C'. .. ' ............. FLOW
MPF-38 208,2 211.O 212.7 319 319 4.8(~- '~';i~-?: :*~': ..... ! FLOW
MPF-30 264.1 269.6 273.2 368 368 5.5 0,9 ; FLOW
MPF-96TD(P01), 368.2 375.5 378.2 485 i 485 , 7,3 1,2 : " FLOW
NOTES: All depths IA dietancea ere in FEET
'AI~ depthe ere referenced fr°m well MPF-68(P19)
Men Flowing safety Sap. ia en"~m.~nt of additJonM cJeawlnue from flowing aefety Nne.
I I I I East 80th Avenue · Anchorage, Alaska 99518 - Telephone: (907) 349-451 I * FAX: (9(3[)) 344-2160
.Sep-19--96
o ..
03:56P Anadrill
DPC
907 344 2160
P.IO
Anadrill
Alaska District
Directional Well Planning Department
NORMAL .PLANE TRAVELLING CYLINDER RESULTS
INCLUDING ELLIPSES OF UNCERTAINTY
Client .............. : BP EXPLORATION
Well Name ....... : MPF-66(P19}
Fie;d ................ ; MILNE POINT
County/State..: BEECHEY POINT, ALASKA
APr# ................ : 50-029-9601 5'00
Anadrill ID# ...... : 500299601 500P1 903
Planned Well Survey Program
Start End Type Interval
0 8000 MEVVD 200
8000 18699 MEWD 93
Date Calculated ..... : 0~}/18/96 16:28
Date Plotted .......... : 0~118/96 16:32
KBE ..................... : : 41.90
Grid X .................. : '~ 541 952.89
Gr~ V .................. ; 603561 7.47
Gr~d Zone ............. : ~..ASP ZONE 04
i
MIN. FLOWING PLUGGED ENTER ENTER EXIT EXIT CLOSE
OFFSET WELL FLOWING ELLIPSE SURVEY SAFETY SAFETY PLUG NO DRILL NO DI~ILL PLUG APPROACH
SAFETY SEP. SEP. MD TVD DIST. DIST. ZONE ZONE ZON;; ZONE STATUS
SEP. i MD MD MD MD
Page 2 of 2
MPL-21 (P07) 3700.2 3781.8 4397.3 9308 4792 81.5 23.3 FLOW
MPF-18 352.6 359.2 363.6 443 443 6.6 1.1 FLOW
MPL-21 3747.2 3829.9 4463.2 9541 ' 4849 82.7 23.9 FLOW
MPF-18(D02) ; 352.8 369.1 361.3 418 416 6.3 1.0 FLOW
MPF-96TC(PO 1 )l 426.3 433,5 436.2 483 483 7.2 1,2 FLOW
MPF-13 I 399.0 405.6 407.9 439 439 6.6 1,1 , FLOW
MPF-10/I 2670.7411.9 418.5 422.9 442 4~2 6.6 1.1 i FLOW
MPL-04 j 2713.6 2875.0 3292 2770 42.9 8.2I FLOW
MPF-96TA(P01 ~ 465.5 462.4 464.9 459 I 459 5.9 1.1 FLOW
MPL-13 j 2434.8 2472.3 2648.3 2752 2493 37.5 6.9 j ,J FLOW
MPF-10(DOS) t 414.1 420;0 422.1 395 395 5.9 1.0 } FLOW
MPF-14(D01) r 385.1 390.6 392.6 366 366 5.5 0.9 I ( FLOW
MPF-14 385.4 390.8 392.8 366 ~ 366 5.5 0.9 FLOW
MPL-05 3647.9 3699.9 3913.0 4194 3094 51.9 10.5 FLOW
MPF-01 485.6 492.1 496.5 435 435 6.5 1.1 ~' FLOW
MPF-21 (DO1) 342.3 346.8 348,4 300 300 4.5' 0.7 FLOW
MPF-21 343.5 348.0 348.8 300 300 4.5 0.7 FLOW
MPF-06 443,~7 449.2 452.8 366 366 5.5 0.9 ~ FLOW
MPF-O6(D01) ~. '~, '~..~9 450.1 451.9 345 345 5.2 0.9 ; FLOW
MPL-O8 3369.? 3396.8' 3601.8 2712 2468 37.1 6.8 ,'kNA )RILL A,(A.Dr~L FLOW
MPL-29 4309.'5 4347.9 14455'0 2838 2543 ~8.4 7.1/-,^ PPROVi:-:D ,,ow
MPL-09 4412.8 4450.2 4535.5 2745 2488 37.4 6.8 , FLOW
MPF-02(P02} 476.4 479.6 481.0 224 224 3.4 0.6 ' FLOW
MPF-02 I 478.3 481.7 482.9 224, 224 3.4 0.6 ~EJ:::; 'li~ % ~,.~. ' FLOW
MPF-02(D01) 478.0 481,3 482.5 224 224 3.4 0.6 I .! FLOW
MPL-11 4773.7 4804.7 4870.3 2108 2025 31.1 5.3 -- I . FLOW
MPL-16 i 4432.5 4460.5 4662.0 1868 1816 28.0 4.7 !NJ rJ/J~['/)~/L "~')LL~ FLOW
MPL-16(D01) 4548.0 457'2.2 4606.3 1611 1580 24.2 4.0
·~" ~ FLOW
MPL-07 5025.2 6048-.9 5078.8 1576 i 1548 23.6 3.9 .~ FLOW
M PL-06 5162.3 5178.5 5190.2 1084 1078 10.3 2.7 FLOW
MPL-10 5045.9 5059.7 . 5067.7 918 915 13.8 2.3 ! FLOW
·
)
"
i
I
..
I ,
NOTES; All depthe & clllt~n~ea ~re In FEET
All depth, ~a referermed from well MPF-66(P19)
MIn Flowing S~fety Sap. ia amount of ~ldltion,4 cleerence from flowing ~fety
, ,
.
East BOth Avenue - Anchorage. Alaska 99518 - TelePhone: (907) 349-4511 - FAX: (907) 344-21 60
. Sep-19-96 O3:54P Anad~ill
Client .............. : BP EXPLORATION
Well Name ....... : MPF-66(P19)
Field ................ : MILNE POINT
County/State..: BEECHEY POINT, ALASKA
APl# ................ : 50-029-96015-00
Anadrill ID// ...... : 500299601500P1903 '
11
220(
DPC 907 344 2160 P. 08
Alaska District
Directional Well Planning Department
NORMAL PLANE TRAVELLING CYLINDER RESULTS
INCLUDING ELLIPSES OF UNCERTAINTY
Planned Well Survey Program
Start End Type Interval
0 B000 MEWD 200
8000 18699 MEWD 93
Date Calculated ..... : 0£118196 16:28
Date Plotted .......... -' 09118196 16:29
KBE ..................... : ! 41.90
Grid X .................. : 541952.89
Grid Y .................. : 6035617.47
Grid Zone ............. : · ASP ZONE 04
MPF-74
121
1 rD 18698.82
-50 -2S 0 25 50 75 100 126 160 175 200 225 250
NORMAL PLANE SEPARATION (1' = 50 fl:)
1111 East 60th Avenue · Anchorage, Alaska 99518 - Telephone: {907) 349-451 I * FAX: {907) 344-2160
· WELL PERMIT CHECKLIST COMPANY
FIELD & POOL ~ ~ ~'/~ INIT CLASS
ADMiNiSTRATiON ............
1. Permit fee at~.ched ...................... N
2. Lease number appropriate .................. N
3. Unique well name and number ................ N
4. Well located in a defined pool ................. N
5. Well located proper distance from ddg unit boundary. N
7. Sufficient acreage available in ddlling unit... N
8. If deviated, is wellbore plat included ............. N
9. Operator only affected party .................. N
10. Operator has appropriate bond in force ............ N
11. Permit can be issued without conservation order ...... N
~----~A"P"~ ,~DA~E ~_~ 12. Permit can be issued without administra~e approvaJ .... N
13. Can permit be approved before 15-day wail ........ N
ENGINEERING
APPR DATE
14. Conductor string provided ................... ~' N\
15. Surface casing protects ail known USDWs .......... YI~[~ ~"5~ ~
16. CMl' vol adequate to circulate on conductor & surf cscj .... Y
17. CMT vol adequate to tie-in long string to surf csg ....... ~Y N
18. (:3MT will cover ail known productive horizons ......... (~ N
19. Casing designs adequate for C, T, B & permafrost ...... (.72 N
20. Adequate tankage or reserve pit. ............... ~
21. If a re-drill, has a 10-403 for abndnmnt been approved .... ~ . ¢,.~¢v.e_
22. Adequate wellbore separation proposed ............ qY-~N
23. If diverter required, is it adequate ................ ~
24. Ddlling fluid program schematic & equip list adequate .... (~ N
25. BOPEs adequate ........................ (~ N
26. BOPE press rating adequate; test to ,,~'&O 0 psig. (~ N
27. Choke manifold complies w/AP! RP-53 (May 84) ...... (~N
28. Work will occur wi~out operalJon shutdown .......... ,~' N
29. Is. presence of H2S gas probable N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures ..... Y N
31. Data presented on poten~al overpressum zones ....... Y
32. Seismic anaiysis of shaJlow gas zones ............. /Y/N
33. Seabed condition survey (if off-shore) ........... ,//. Y N
34. Contact name/phone for weeidv proqress reports .... Z'... Y N
[~p~oratory on~y]
REMARKS
GEOLOGY: ENGINEERING: COMMISSION:
R P,¢~/~ BEW~'.~ ;~f~:) DWJ~
JDH ~ JDN
TAB
Comments/Instructions:
Well HistorY File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Mon Aug 17 04:04:02 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/08/17
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing
Services
Library.
Scientific Technical
Tape Header
Service name ............. LISTPE
Date ..................... 98/08/17
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
WELL 'NAME: 9°%0 - R)
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT
Scientific Technical
MWD RUN 7
AK-MM-60110
A. PIEPER
J. PYRON
FROM MSL 0)
AUG 1 9 1998
Alaska 0]1 & Gas Cons. Commission
Anchorage
2165
2608
6
13N
10E
RECEIVED
500292269701
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
17-AUG- 98
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
.00
41.50
12.40
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
20.000 110.0
12.250 9.625 8223.0
8.500 18823.0
1. THIS LDWG DATA IS DEPTH SHIFTED (REDO) AS PER THE
REQUEST OF KATIE
NITZBERG OF BPX ON 08/06/98.
2. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
3. WELL MPF-66A IS REPRESENTED BY RUNS 1, 2, AND 7.
4. RUNS 1 AND 2 ARE DIRECTIONAL ONLY AND DATA IS NOT
PRESENTED.
5. DATA FROM RUNS 3, 4, 5, AND 6 IS RELAVENT TO WELLS
MPF-66PB1, AND MPF-66,
ONLY, SO IT IS NOT PRESENTED HERE.
6. RUN 7 IS DIRECTIONAL WITH GAMMA RAY (SGRC) AND
ELECTROMAGNETIC WAVE 4-PHASE
RESISTIVITY (EWR4).
7. MPF-66A KICKED OFF FROM MPF-66, AT 8183'MD (4491'TVD)
WHEN MPF-66 HAD TO
BE PLUGGED BACK AND SIDETRACKED BECAUSE THE BHA WAS LOST
IN THE HOLE ON
RUN 6.
8. MPF-66A IS DRILLED TO TOTAL DEPTH (TD) @ 18823'MD,
7791'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY
SENSOR).
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/08/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
.5000
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
START DEPTH STOP DEPTH
8193.0 18805.5
8193.0 18805.5
8193.0 18805.5
8193.0 18805.5
8202.5 18813.0
8275.0 18805.5
8277.0 18889.0
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
8193.0
8219.0
8261.0
8336.0
8374.5
8740.0
8766.5
8878.0
9504.5
10188.0
10606.5
11898.0
13741.5
15169.0
16427.0
17013.5
17052.0
17131.0
17689.0
17719.5
18082.5
18086.5
18094 0
18201 5
18226 0
18379 0
18445 0
18467 0
18485 5
18490 0
18497 0
18502 5
185O5 0
18509 5
GR
8141 0
8167 0
8209 0
8281 0
8322 5
8681 5
8700 5
8814 5
9442 0
10133 5
10550 5
11838 0
13678 0
15103.0
16360.0
16945.0
16986.0
17065.0
17623.0
17653 0
18015 0
18017 0
18025 5
18136 0
18159 5
18311 0
18376 0
18398 0
18417 5
18421 5
18428.0
18433.0
18435.0
18440.5
EQUIVALENT UNSHIFTED DEPTH
18515.0 18445.5
18526.5 18456.0
18543.0 18476.5
18889.0 18822.5
$
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO
MWD 7
$
REMARKS: MERGED MAIN PASS.
$
MERGE TOP
8224.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
18823.0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max
DEPT 8193 18889
ROP 5.9673 2980.01
GR 33.0532 157.829
R?X 0.4845 2000
RPS 0.6928 80.1419
RPM 0.7307 2000
RPD 0.3636 2000
FET 0.3241 19.5347
Mean Nsam
13541 21393
165.87 21225
88.4834 21222
3.4119 21226
3.49555 21226
3.86943 21226
7.23378 21226
1.34038 21062
First
Reading
8193
8277
8202.5
8193
8193
8193
8193
8275
Last
Reading
18889
18889
18813
18805.5
18805.5
18805.5
18805.5
18805.5
First Reading For Entire File .......... 8193
Last Reading For Entire File ........... 18889
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/08/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/08/17
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
RPD
RPM
RPS
RPX
GR
FET
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
8141 0
8141 0
8141 0
8141 0
8150 5
8222 5
8224 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
STOP DEPTH
18739.0
18739.0
18739.0
18739.0
18746.5
18739.0
18822.5
28-SEP-96
ISC 4.54
MWD 5.46
MEMORY
18823.0
8224.0
18823.0
44.9
77.1
TOOL NUMBER
P0585CRGPM6
EWR4
$
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
P0585CRGPM6
8.500
8.5
BARA DRL N FLD
10.00
52.0
9.4
800
3.0
1.700
.676
1.700
2.800
71.7
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 7 AAPI 4 1 68 4 2
RPX MWD 7 OHM~ 4 1 68 8 3
RPS MWD 7 OHM~ 4 1 68 12 4
RPM MWD 7 OHMM 4 1 68 16 5
RPD MWD 7 OHMM 4 1 68 20 6
FET MWD 7 HOUR 4 1 68 24 7
ROP MWD 7 FT/H 4 1 68 28 8
First Last
Name
DEPT
GR
RPX
RPS
RPM
RPD
FET
ROP
Min
8141
33 0532
0 4845
0 6928
0 7307
0 3636
0 3241
5 9673
Max
18822.5
157. 829
2000
80.4814
2000
2000
19.5347
2980.01
Mean Nsam
13481.8 21364
88.4757 21193
3.42011 21197
3.50326 21197
3.87722 21197
7.24536 21197
1.34587 21034
165.848 21197
Reading
8141
8150.5
8141
8141
8141
8141
8222.5
8224.5
Reading
18822.5
18746.5
18739
18739
18739
18739
18739
18822.5
First Reading For Entire File .......... 8141
Last Reading For Entire File ........... 18822.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/08/17
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/08/17
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Connnents ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/08/17
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physical EOF
Physical EOF
End Of LIS File