Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
189-091
XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. File Number of Well HistOry File PAGES TO DELETE RESCAN [] Color items - Pages: [] Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED /~ Logs of various kinds [] Other Complete COMMENTS: Scanned by: ~ Bren Vincent Nathan Lowell Date:5¢fl~0~ Is, ~ [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Bren Vincent Nathan Lowell Date: Is~ NOTScanned.wpd "'-" STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service :i ~ 2. Name of Operator ~-'~--'' ".¥~ ..~ 7. Permit Number BP Exploration (Alaska)Inc. i§;_fr,~._..~ '~ 189-091 3. Address ~'3.~L~ 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 -';~~~'~' "'-"" 50-029-21970-00 4. Location of well at surface 9. Unit or Lease Name 735' SNL, 1442' WEE, SEC. 21, T11 N, R12E, UM X = 611789, Y = 5959518 Prudhoe Bay Unit At top of productive interval 2595' NSL, 1938 WEE, SEC. 16, T11 N, R12E, UM X = 611235, Y = 5962840 10. Well Number ,,,,'- At total depth 2837' NSL, 1810' WEE, SEC. 21, T11N, R12E, UM X = 611267, Y = 5963083 W-32 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 90.86 ADL 028263-2 12' Date Spudded 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband' 115' Water depth' if °fish°re 110' N°' °f C°mpleti°ns08/26/1989 09/10/1989 11/7/2002 N/A MSL Zero :17. Total Depth (MD+'FVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set121. Thickness of Permafrost 10240 9242 FTI 9450 8589 FTI [] Yes ~ NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run BHC/GR, CN/GR, DIL/GR 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE ToP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 13-3/8" 68# L-80 Surface 2698' 17-1/2" 3840 cuft Cold Set III & II 9-5/8" 47# L-80 Surface 9655' 12-1/4" 2017 cuft Class 'G' 5-1/2" 17# NT-80 9377' 10240' 8-1/2" 340 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9692' Set 5-1/2" Baker 'Fl' Retainer Packer with Whipstock on top of the packer 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BeE GAS-MCF WATER-BeE CHOKE SIZE ~ GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER'BBL O~L GRAWTY-API (CORR) Press. 24-HOUR RATE 28, CORE DATA Brief description of Iithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips._ . RECE, IVE . No core samples were taken. I Ataska & . t-~ t~,- ~ ;~ Anchorage Form 10-407 Rev. 07-01-80 nrjrlNS BFL FE,9 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 9648' 8754' Shublik 9681' 8781' Zone 4 9809' 8888' ;~ "--L.~_._. .-.. . ¢ . .-~ ~.- 3~. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Ter, e Hubb,e ."~j~ ~ Title Technical Assistant Date ~-/~)° O~ W-32 189-091 302-357 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Rob Tirpack. 564-4166 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, Water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 ,~,D 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITSM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: W-32A Accept: 10/31/02 Field: Prudhoe Bay Unit Spud: 11/10/02 APl: 50-029-21970-01 Release: 11/29/02 Permit: 202-209 Rig: Doyon 14 ..... Date "', .... '",i,"','",":","',i'ii,,' ,', ,:." ,~ PRE-RIG WORK 10/04/02 T/I/O = SI/0/420. PPPOT-T PASSED (PRE-RWO DIAGNOSTICS). PRESSURED UP VOID TO 5000 PSI. AFTER 15 MIN THE PRESSURE WAS 5000 PSI AND AFTER 30 MIN THE PRESSURE WAS 5000 PSI. PPPOT-IC PASSED (PRE-RWO DIAGNOSTICS). PRESSURE UP VOID TO 3200 PSI. AFTER 15 MIN THE PRESSURE WAS 3150 PSI AND AFTER 30 MIN THE PRESSURE WAS 3150 PSI. 10/07/02 D&T TOP OF IBP @ 9458' ELM COR W/2.50 CENT. PULL 1-1/2" DGLV-RA FROM STA-1 (LEAVE PKT EMPTY). LRS CIRCULATE THROUGH IA INTO TUBING. 10/08/02 PUMPED 5 BBLS OF METHANOL FOLLOWED BY 840 BBLS OF SEAWTER WITH 125 BBLS OF DIESEL FOR FREEZE PROTECT IN THE INNER ANNULUS. PUMPED 10 BBLS METH DOWN FLOWLINE FOR FREEZE PROTECT. LOAD TUBING AND IA W/SALTWATER, PULL IBP (RUBBER ELEMENTS LEFT IN THE HOLE) MAKE ONE ATTEMPT TO PULL ELEMENTS. (RUBBER ELEMENTS LEFT IN HOLE). FREEZE PROTECT TBG WITH 22 BBLS METHANOL 10/10~02 TIO=VAC/VAC/VAC. MONITOR WHP'S. TBG FL NEAR SURFACE. IA FL NEAR SURFACE. 10/11/02 STRING SHOT & CHEM CUT 3 1/2" TUBING @ 9275' MD (LEAVING 7' OF CLEAN STUB LOOKING UP FOR OVERSHOT). GOOD INDICATION OF CUT. NOTIFY PAD OPER OF STATUS - WELL TO REMAIN SHUT IN FOR RIG. 10/12/02 T/FO = VCNVAC/VAC TBG AND IA FL TBG FL @ 450', IA FL @ 475'. 0/20/02 T/I/O/= SINACNAC MONITOR WHP'S PRE CA GEL JOB. PLACED 2500" OF 100 MESH SAND, 1200# BENTONITE AND 8# LAMINATED CELLOFLAKE IN A 20 BBL GEL DIESEL SLURRY INTO THE CA, DISPLACED PILL WITH 15 BBLS DIESEL. SECURED WELL WITh 780 PSi ~OAP. ' ~.______. '" ' 10/24/02 PUMP 20 BBLS OF DIESEL TO ATTEMPT A MIT ON THE CA TO 2400 PSI. MIT FAILED. LLR OF 0.5 BPM @ 1750 PSI. 10/25/02 T/IlO = 0NAC/600, MONITOR WHP'S POST MITOA. CA DOWNSQUEEZE (GELLED DIESEL/BENTONITE). 10/27/02 MIT-CA TO 2400 PSI, FAILED, 3 BBLS DIESEL. TIC= 0NAC/525 (POST CA SQZ) W-32A, Pre-Rig Work Page 2 10/28/02 T/I/O-SI/VAC/550 MITOA TO 2400 PSI PASSED. OA FL AT SURFACE. PUMPED 17 GALS OF DIESEL TO PRESSURE OA TO 1000 PSI, OA LOST 70 PSI IN 15 DINS. PUMPED 24 GALS OF DIESEL TO PRESSURE OA TO 1500 PSI, OA LOST 60 PSI IN 15 DINS. PUMPED 27 GALS OF DIESEL TO PRESSURE OA TO 2000 PSI, OA LOST 45 PSI IN THE 1ST 15 DINS AND 55 PSI IN THE 2ND 15 MINS. OA LOST 50 PSI IN THE 3RD 15 MINS AND 30 PSI IN THE 4TH 15 DINS. (FILL UP AFTER 1 HR WAS 12 GALS/LLR @ 0.2 GPM. PUMPED 12 GALS TO REPRESSURE OA TO 2020 PSI AND THE OA LOST 20 PSI IN THE 1ST 15 MINS AND 40 PSI IN THE 2ND 15 DINS. 30 PSI IN THE 3RD 15 DINS. 30 PSI IN THE 4TH 15 MINS. MITOA TO 2400 PSI; PUMPED 24 GALS TO PRESSURE OA TO 2400 PSI. THE OA LOST 50 PSI IN THE 1ST 15 MINS, 20 PSI IN THE 2ND 15 DINS, PUMPED AT TOTAL OF 2.5 BBLS OF DIESEL. FINAL WHPS=SI/VAC/0. 10/29/02 T/I/O = 0/0/460, MONITOR WHP'S POST MITOA. BP EXPLORATION Page I ~ Operations Summa Report. Legal Well Name: VV-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 10/31/2002 15:00 - 16:00 1.00 MOB P !PRE Held PJSM. Skidded Rig Floor. 16:00 - 18:00 2.00 MOB P I PRE Held PJSM. Moved off of W 38L1. Moved in Rig and Spotted over W 32L1. Shimmed and Set Rig. 18:00 - 19:00 1.00 MOB P PRE Skidded Rig Floor into Position. 19:00 - 20:00 1.00 RIGU P PRE Set Cuttings Tank, R / U Rig Floor. 20:00 - 22:00 2.00 PULL P DECOMP Took on Sea Water. R / U Manifold and Circulating Lines. Accepted Rig {~ 2000 hrs 10131 12002 22:00 - 00:00 2.00 PULL P DECOMP Held PJSM. Circulated Freeze Protect Diesel out of Wellbore. Pumped 40 bbls to Achieve Circulation. Pumped Down IA and Took Returns up Tubing. Overboarded 45 bbls of Diesel and Diesel cut Dirty Seawater, Rate 5 bpm, 600 psi. Pumped Down Tubing and Took Returns up IA, Overboarded 150 bbls of Diesel and Diesel cut Dirty Seawater, Rate 5 bpm, 600 psi. 111112002 00:00 - 02:00 2.00 PULL P DECOMP Circulated 1 Complete Wellbore Volume. Pump Rate 7.5 bpm, 1,650 psi. Losses while Circulating 80 bph. No Gas on Bottoms Up. Pumped and Spotted 30 bbl Hi-Vis Pill at the Tubing Cut at 9,275'. 02:00 - 02:30 0.50 PULL :) DECOMP Blew Down Lines, R / D Circulating Manifold. 02:30 - 03:00 0.50 WHSUR P DECOMP Held PJSM. Ran and Set TWC Valve in Tubing Hanger Profile. 03:00 - 04:30 1.50' WHSUR :) DECOMP Held PJSM. N / D Production Tree and Adapter Flange, Checked Tubing Hanger Threads, Checked XO Make Up in Hanger, OK. 04:30 - 06:30 2.00 BOPSUI; 3 DECOMP Held PJSM. N ! U 13-5/8" x 5,000 psi BOP Stack. Hydril Annular Preventer, Top Pipe Rams w/2-718" x 5" Variable Rams, Blind Ram, Lower Pipe Rams w/3-112" x 6" Variable Rams. 06:30 - 07:30 1.00 BOPSURIP DECOMP Held PJSM. R ! U Equipment to Test BOPE. 07:30 - 12:00 4.50 BOPSUI~ P DECOMP Tested BOPE. Tested Upper Rams, Stand Pipe Manifold, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves and IBOP to 3,500 psi High / 250 psi Low. Tested Annular Preventer to 2,500 psi High ! 250 psi Low. All Tests Held f/5 Min. All Pressure Tests Held wi No Leaks or Pressure Loss. Witnessing of BOPE Test Waived by AOGCC Rep Jeff Jones. 12:00 - 12:30 0.50 BOPSUF P DECOMP i Held PJSM. R ! D BOPE Test Equipment. 12:30 - 13:30 1.00 ! WHSUR P DECOMP Held PJSM. R ! U DSM Lubricator, Pulled TWC, Well on !Vacuum. R I D DSM. Filled the Hole, Took 65 bbls. Static Losses while Testing BOPE 5.5 bph. 13:30 - 14:00 0.50 PULL P DECOMP Held PJSM. R ! U Camco Spooling Equipment. R I U Equipment to Pull Tubing. M I U I Joint 5" DP and XO to 3-112" TDS Threads. 14:00 - 14:30 0.50 PULL P DECOMP RIH and Screwed into Tubing Hanger. Backed Out Lock Down Screws. Pulled on Tubing Hanger and String. Tubing and Hanger Pulled Free at 120,000~, String Weight 132,000~. Pulled Tubing Hanger to Rig Floor. Terminated Control Lines, Broke Out and L ! D Tubing Hanger. 14:30 - 16:00 1.50 PULL P DECOMP Circulated Bottoms Up. Pump Rate 7 bpm, 875 psi. Losses while Circulating 12 bph. No Gas on Bottoms Up. Pumped and Spotted 30 bbl Hi-Vis Pill at 9,275'. 16:00 - 20:00 4.00 PULL P DECOMP POOH, L I D 65 Jts 3-1/2" 9.3~ TDS Tubing, SSSV Assembly. Spooled Up Dual Encapsulated Control Line while POOH. Recovered 4 Stainless Steel Bands and 33 Rubber CL Clamps. Printed: 12/6/2002 1:56:39PM BP EXPLORATION Page 2 ~ Operations Summary Report Legal Well Name: W-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task ~ Code NPT Phase Description of Operations 1111/2002 16:00 - 20:00 4.00 PULL P DECOMP 100% Recovery of Clamps and Bands. 120:30 - 21:30 1.00 PULL P DECOMP Rigged Down Camco Spooling Equipment and Cleared Rig Floor. 21:30-00:00 2.50 PULL P DECOMP POOH, LID3-1/2"9.3#TDSTubing. L/DaTotalof200Jts @ 0000 hrs. Losses 17 bph. 111212002 00:00 - 03:00 3.00: PULL P DECOMP Held PJSM. POOH, L / D 3-112" 9.3~ TDS Tubing. Recovered: 288 jts of 3-112" Tubing, 6 GLM Assemblies, I SSSV Assembly, 2 x 10 ff space out pups, Cut Off Joint of 3-112" Tubing - 3.51°. Losses 15 bph. 03:00 - 04:00 1.00 BOPSUF; P DECOMP Held PJSM. R i U Equipment to Test BOPE. Ran and Set Test Plug and Test Joint. Tested Lower Pipe Rams and Blind Rams =to 3,500 psi High / 250 psi Low. All Tests Held fl 5 Min. All Pressure Tests Held wi No Leaks or Pressure Loss. Witnessing of BOPE Test Waived by Jeff Jones-AOGCC Rep. Pulled Test Plug, L / D Test Joint. Ran and Set Wear Bushing. I Wear Bushing I.D. = 8.75". R I D Test Equipment. 04:00 - 04:30 0.50 PULL P I DECOMP Held PJSM. R I U to Run Fishing BHA and 5" DP. Brought I. Fishing BHA Components up to Rig Floor. 04:30 - 05:30 1.00 PULL P i DECOMP M / U Fishing BHA: 8-1/8" Guide Bowl and Overshot Extension w/3-112" Basket Grapple - Top Sub - XO Sub - Bumper Sub - 6-114" Oil Jars - 8 x 6-3~4" D.C. - 7 x 5" HWDP. BHA Length 486.05'. 05:30 - 07:00 1.50 PULL P DECOMP RIH w/Overshot Fishing BHA on 5" DP from Derrick to 5,653'. 07:00 - 08:00 1.00 PULL P DECOMP Held PJSM. Cut and Slip Drilling Line. Serviced Top Drive. 08:00 - 11:30 3.50 PULL P DECOMP RIH w/Overshot Fishing BHA on 5" DP to 9,200. P / U DP Singles from Pipe Shed. 11:30 - 12:00 0.50 PULL !P DECOMP M I U Top Drive and Engaged Pump. Checked Parameters: String Weight Up 247,000~, String Weight Down 217,000~, String Weight Rotating 227,000~. Pump Rate 5 bpm, 150 psi. Washed Down to the Top of and Swallowed Fish, Pump Pressure Increased to 400 psi. Shut Down Pump and Fully Engaged Fish at 9,280'. Overpulled 15,000~ and Rotated Drill String to the Right in Attempt to Release K Anchor. Drill String Rotated Freely w/No Increase in Torque. Increased Overpull to 25,000~ and Rotated Drill String wi No Increase in Torque. SBR Rotating Freely on Slick Stick. Jarred on Fish and Sheared SBR Free from Slick Stick. 12:00 - 13:00 1.00 PULL 3 DECOMP Circulated Bottoms Up, Pump Rate 7.5 bpm, 300 psi. No Gas to Surface. Losses 4 bph. Pumped and Spotted 30 bbl Hi-Vis Pill at 9,270'. 13:00 - 16:30 3.50 PULL 3 DECOMP POOH wi 5" DP. Losses while POOH 3 bph. 16:30 - 17:00 0.50 PULL :~ DECOMP POOH w/Fishing BHA. 17:00 - 17:30 0.50 PULL P DECOMP Held PJSM. Broke Out and L / D Fish. Recovered: Cut Jt, X !Nipple, Pup Jt, SBR Barrel, 30.5'. 17:30 - 18:30 1.00 PULL P DECOMP iHeld PJSM. M ! U Fishing BHA: 8-118" Guide Bowl, Double Pin · Bushing, Bowl and Overshot Extension w/3-1/2" Basket Grapple - Top Sub - XO Sub - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. - Accelerator Jars - 7 x 5" HWDP. BHA Length 502.55'. 18:30 - 21:00 2.50 PULL P DECOMP RIH wi Fishing BHA on 5" DP to 9,215°. Losses while RIH 2 bph. 21:00 - 21:30 0.50 PULL P DECOMP M I U Top Drive and Engaged Pump. Checked Parameters: Printed: 12/6/2002 1:56:39PM BP EXPLORATION Page 3 ~ Operations Summa Report Legal Well Name: W-32 Common Well Name: W-32 Spud Date: 10131/2002 ~Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYEN Rig Release: 11/29/2002 Rig Name: DOYEN 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 111212002 21:00 - 21:30 0.50 PULL P DECOMP !String Weight Up 247,000~, String Weight Down 217,000~, String Weight Rotating 227,000~. Pump Rate 5 bpm, 150 psi, RPM 30, Torque 5,000 ft / lbs. Washed Down to the Top of and Swallowed Fish, Pump Pressure Increased to 550 psi. Shut Down Pump and Fully Engaged Fish at 9,285'. Overpulled 25,000~ and Rotated Drill Stdng to the Right 8 turns, Torque Increase to 9,000 ff / lbs and Dropped back to 5,000 ft / lbs. K Anchor Released. 21:30 - 22:30 1.00 PULL ;~ DECOMP Circulated Bottoms Up, Pump Rate 8 bpm, 350 psi. No Gas to' Surfaco. Losses 2 bph. Pumped and Spotted 30 bbl Hi-Vis Pill at 9,280'. 22:30 - 23:00 0.50 PULL :) DECOMP POOH w/5" DP to 8,350'. 23:00 - 00:00 1.00 PULL N RREP DECOMP Held PJSM. Rig Repair. Repair Drawworks Clutch. 111312002 00:00 - 02:00 2.00 FISH N RREP DECOMP Held PJSM. Repaired Rig. Worked on Drawworks Clutch. 02:00 - 04:00 2.00 FISH :) DECOMP POOH w/5" DP to 500'. 04:00 - 04:30 0.50 FISH P DECOMP POOH w/Fishing BHA. 04:30 - 05:00 0.50 FISH P DECOMP Broke Out and L I D Fish. Recovered: Slick Stick and K Anchor. 14.25' 05:00 - 05:30 0.50 FISH P DECOMP Cleared Rig Floor. Brought Milling Assembly to Rig Floor. 05:30 - 06:30 1.00 FISH P DECOMP Held PJSM. M / U Milling BHA: 2.75" Bullnose Mill - PRT wi 4" Grapple - PRT Extension - 8.5" Packer Mill - Triple Conn Sub - 3 x Boot Baskets - Bit Sub - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. - 7 x 5" HWDP. BHA Length 500.21'. 06:30 - 07:00 0.50 FISH P DECOMP RIH w/Milling BHA on 5" DP to 2,989'. 07:00 - 08:00 1.00 FISH P ;DECOMP Held PJSM. Slipped and Cut Drilling Line. Serviced Rig. 08:00 - 10:00 2.00 FISH P DECOMP RIH wi Milling BHA on 5" DP to 9,300'. Tagged Fish at 9,300'. 10:00 - 14:30 4.50 FISH P DECOMP M / U Top Drive, Established Parameters: Pump Rate 5 bpm, 530 psi, String Weight Up 245,000~, String Weight Down 220,000~, String Weight Rotating 235,000~. RPM 90, Torque 5,000 ft / lbs. Milled 9-5/8" x 3-112" Packer from 9,300' to 9,303'. WOM 5,000~- 10,000~, RPM 120, Torque Off Bottom 5,000 fl / lbs, Torque On Bottom 7,000 - 11,000 ff I lbs. Attempted to Push Packer Down Hole After Milling Slips. Packer did not Move. Set Down on Packer wi 20,000 to Ensure PRT Grapples Engaged. 14:30 - 15:00 0.50 FISH P DECOMP Circulated Bottoms Up, Pump Rate 5 bpm, 470 psi. No Gas to Surfaco. Losses 2 -3 bph. 15:00 - 18:00 3.00 FISH :~ DECOMP POOH w/5" DP from 9,303' to 500'. 18:00 - 19:30 1.50 FISH :) DECOMP POOH w/Milling BHA. Broke out and L I D Packer and Tailpipe. 100% Total Recovery. Length 65.37'. 19:30 - 20:30 1.00 FISH 3 DECOMP Broke Out and L / D Packer Mil, Triple Conn Sub, Boot Baskets, Bit Sub, Bumper Sub and Oil Jars. Cleaned Out Boot Baskets, Recovered 5 Gallons of Metal Cuffings. 20:30 - 21:00 0.50 FISH P DECOMP Cleared BHA Components from Rig Floor. 21:00 - 22:00 1.00 FISH 3 DECOMP RIH w! 6-3/4" D.C. and 5" HWDP. Broke Out and L / D Same. 22:00 - 23:00 1.00 FISH P DECOMP Held PJSM. Brought 2-718" Clean Out BH^ Components to Rig Floor. R ! U Handling Equipment f/2-718" Components. 23:00 - 00:00 1.00 FISH P DECOMP M ! U Clean Out BH^. 11/412002 00:00 - 02:00 2.00 FISH P DECOMP Held PJSM. M I U Clean Out BHA: 4-314" Junk Mill - Bit Sub - 8 x 3-318" D. C. - Double Pin Sub - XO - 5-1/2" Casing Scraper- Bit Sub - 3-3/4" Bumper Sub - 3-314" Oil Jars - 4 x 3-318" D.C. - XO - 8 Jt$ 2-7~8" DP - XO - Double Pin Sub - 9-518" Casing Scraper - Bit Sub. BHA Length 642.08'. R I D 2-718" Handling Printed: 12/6/2002 1:56:39PM i r , BP EXPLORATION Page 4~ Operations Summa Report Legal Well Name: VV-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/3112002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 11/412002 = 00:00 - 02:00 2.00 FISH P DECOMP Equipment, R / U 5" Handling Equipment. 02:00 - 05:00 3.00 FISH P DECOMP RIH w/Clean Out BHA on 5" DP to 9,380'. Tagged up just Inside Top of Liner at 9,380' 05:00 - 16:30 11.50 FISH P DECOMP M / U Top Drive and Engaged Pumps. Established Parameters: Pump Rate 5 bpm, 700 psi, RPM 40, Torque Off Bottom 3,000 ft / lbs, String Weight Up 220,000~, String Weight Down 210,000~, String Weight Rotating 215,000~. Attempted to Wash Down without Rotating, Set Down wi 15,000~, Could not Push Junk Down. Washed and Milled on Junk from 9,380' to 9,990'. WOM 5,000~, RPM 80, Torque On Bottom 5,000 ft I lbs, Torque Limiter Set to Stall out at 5,500 ff / lbs. Pump Rate 6 bpm, 840 psi. 16:30 - 17:30 1.00 FISH P DECOMP POOH to 9,870', Drill String Hung Up on Junk in the Hole. M I U Top Ddve and Pumped out of the Hole from 9,870' to 9,350'. 17:30 - 19:00 1.50 FISH P DECOMP RIH to 9,740', Whipstock Packer Setting Depth. No Drag, Hole Clean. Pumped and Circulated around 30 bbl Hi-Vis Sweep. Pump Rate 7 bpm, 1,200 psi. Losses While Circulating 5 bph. Pumped and Spotted 30 bbl Hi-Vis Pill at 9,740' to Control Losses. Flow Checked Well, Fluid Level Dropped Very Slowly. 19:00 - 19:30 0.50 FISH P DECOMP Held PJSM. POOH wi 5" DP to 8,480'. 19:30 - 21:00 1.50 FISH P DECOMP Held PJSM. Slipped and Cut Drilling Line. 21:00 - 23:30 2.50 FISH P DECOMP POOH wi 5" DP to 1,790'. 23:30 - 00:00 0.50 FISH P DECOMP Held PJSM. M I U RTTS Packer wi Storm Valve. 111512002 00:00 - 00:30 0.50 WHSUR P DECOMP Held PSJM. RIH wi RTTS and Set at 50'. Backed out of Storm Valve and POOH w/5" DP. M / U Retrieving Tool and Pulled Wear Bushing. ,00:30 - 01:30 1.00 WHSUR :) DECOMP M I U Packoff Retrieving Tool to 5" DP, RIH and Latched onto I Packoff. Ensured that OA was 0 psi, Backed Out Lock Down I Screws. Pulled Packoff Out of Wellhead and through BOP ~ Stack to Surface. M I U New Packoff onto Tool, Ran and Set ! Packoff in Wellhead and RILDS. Tested Packoff to 5,000 psi fl j 10 minutes, OK. 01:30 - 02:30 1.00 WHSUR P DECOMP RIH wi Packer Retrieving Tool and Stabbed into Storm Valve. Checked f/Pressure under Packer, 0 psi. Released and Pulled I RTTS Packer Surface. Broke Out and L / D to R'I-rS Packer. Ran and Set Wear Bushing. 02:30 - 03:00 0.50: FISH P DECOMP POOH w/5" DP and Racked Back in Derrick. 03:00 - 04:30 1.50' FISH P DECOMP R ! U Equipment fl 2-7~8" Clean Out Equipment. POOH, Broke Out and L I D Clean Out BHA. 04:30 - 05:00 0.50 FISH P DECOMP Held PJSM. Cleared Rig Floor, R I U 5" DP Equipment. M / U RTTS Packer. 05:00 - 08:00 3.00 FISH P DECOMP RIH wi RTTS Test Packer on 5" DP to 9,370°. 08:00 - 09:30 1.50 FISH P DECOMP Held PJSM. Set R'I-rS at 9,370°. Closed Pipe Rams and Tested 9-5~8" Casing as Follows: Strokes Pmp'd Pressure 10 570 psi 20 1,000psi '? '%,%0 30 1,480 psi~ ~, ~ (,.3 40 1,990 psi,,. ~5 ~ ~ 50 2,520 psi ,~ ,.~"~ (~ 55 2,800 psi 60 3,040 psi ~' ~ ~ O 65 3,330 psi '~, ~ % ~ Printed: 12/6/2002 1:56:39PM BP EXPLORATION Page 5~1~1~ Operation Summa Report Legal Well Name: W-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task :Code NPT Phase Description of Operations 111512002 08:00 - 09:30 1.50 FISH P DECOMP 68 3,520 psi Held Pressure f/30 minutes, Pressure Held at 3,510 psi f/30 minutes. Bled Down Pressure, Opened Pipe Rams. Released RTTS Packer. 09:30 - 13:00 3.50 FISH P DECOMP POOH wi 5" DP to Surface. 13:00 - 13:30 0.50 FISH P DECOMP Broke Out and L / D RI'TS. 13:30 - 14:00 0.50 CLEAN P DECOMP Held PJSM. R / U Schlumberger E-Line Equipment. 14:00 - 15:30 1.50 CLEAN P DECOMP RIH w/4.75" Gauge Ring and Junk Basket on E-Line. Tagged Up at 9,560', Could not Work Gauge Ring Deeper. Gauge Ring Hung Up while Pulling Up, 500~ Overpull to Clear. POOH wi Gauge Ring and Junk Basket. No Recovery in Junk Basket. 15:30 - 16:30 1.00 CLEAN P DECOMP Broke Off 4.75" Gauge Ring, RIH w/2.75" Junk Basket to 9,760'. OK. POOH w/Junk Basket, Recovered 1/2 Cup of Calcium Carbonate. 16:30 - 17:30 1.00 CLEAN P DECOMP M / U 4.75" Gauge Ring w/Junk Basket and RIH on E-Line. ITagged up at 9,560'. Gauge Ring Hung Up while Pulling Up, 2,000~ Overpull to Clear. Continued wi Intermittent Drag fl 15'. POOH wi Gauge Ring and Junk Basket. Recovered 1/2 piece of Rubber in Junk Basket. 17:30 - 18:00 0.50 CLEAN ~ P DECOMP R I D Schlumberger E-Line Equipment. 18:00 - 21:00 3.00 CLEAN P DECOMP Held PJSM. M I U Clean Out BHA: 4-3/4" Junk Mill - Bit Sub - 5-1/2" Casing Scraper - XO - 2 x Junk Baskets - XO - XO - 3-314" Bumper Sub - 3-3/4" Oil Jars - 12 x 3-3/8" D.C. - XO - XO - XO - 2 x 9-5/8" Junk Baskets - XO. BHA Length 402.06'. 21:00 - 23:30 2.50 CLEAN P DECOMP R I D 2-7/8" Handling Equipment, R / U 5" Handling Equipment. RIH w/Clean Out BHA on 5" DP to 9,000'. 23:30 - 00:00 0.50 CLEAN P DECOMP Held PJSM. Slipped and Cut Drilling Line. 11/612002 00:00 - 00:30 0.50 CLEAN P DECOMP Held PSJM. Finished Slipping and Cutting Drilling Line. 00:30 - 01:00 0.50 CLEAN P DECOMP RIH w/Clean Out BHA on 5" DP to 9,655'. Tagged Up at 9,655'. 01:00 - 02:30 1.50 CLEAN P DECOMP M / U Top Drive and Engaged Pumps. Established Parameters: Pump Rate 5 bpm, 400 psi, RPM 20, Torque Off Bottom 2,000 ff / lbs, String Weight Up 225,000~, String Weight Down 212,000~, String Weight Rotating 222,000~. Attempted to Wash Down without Rotating, Set Down wi 10,000~, Washed and Milled from 9,655' to 9,765'. WOM 1,000~, RPM 50, Torque On Bottom 5,000 ff / lbs, Torque Limiter Set to Stall out at 5,500 ff / lbs. Staged Up Pump Rate from 8 bpm, 1,150 psi to 12 bpm, 2,650 psi. Slowed Pump Rate Down to 4 bpm, 300 psi and RIH to Tag top of 5-1/2" w/9-5/8" Junk Basket, Pressure Increased to 500 psi. 4-314" Mill Depth 9,764', 5-112" Casing Scraper Depth 9,760', 9-5/8" Junk Basket Depth 9,370'. 02:30 - 04:00 1.50 CLEAN P DECOMP Pumped and Circulated Around 2 - 30 bbl Hi-Vis Barafiber Sweeps, 15 Minutes Apart. Pump Rate 14.5 bpm, 3,400 psi. No Losses. Circulated Back Very Small Amount of Calcium Carbonate. 04:00 - 04:30 0.50 CLEAN P DECOMP POOH wi Clean Out BHA to Top of 5-1/2" Liner at 9,377'. RIH without Pumps or Rotation to 9,764'. Did not Encounter any Junk while RIH. 04:30 - 08:00 3.50 CLEAN P DECOMP POOH w/5" DP to 400' 08:00 - 09:30 1.50 CLEAN P DECOMP POOH wi BHA, Stood 3-318" DC in Derrick, Broke Out and L I D Junk Baskets, Casing Scraper, Jars, Bumper Sub and Mill. Cleaned out Junk Baskets, Recovered 2 Cups of Calcium -- Printed: 12/6/2002 1:56:39 PM BP EXPLORATION Page 6 ~ Operations Summa Report Legal Well Name: VV-32 Common Well Name: VV-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 111612002 08:00 - 09:30 1.50 CLEAN i p DECOMP Carbonate from 9-5/8" Junk Baskets, No Recovery in 5-1/2" Junk Baskets. 09:30 - 10:00 0.50 CLEAN P DECOMP Held PJSM. R / U Schlumberger Equipment. 10:00 - 11:30 1.50 CLEAN P DECOMP RIH w/4.75" Gauge Ring and Junk Basket on E-Line. Tagged Up at 9,680', Could not Work Gauge Ring Deeper. Gauge Ring Hung Up while Pulling Up, 800~ Overpull to Clear. POOH w/ Gauge Ring and Junk Basket. No Recovery in Junk Basket. 11:30 - 12:00 0.50 CLEAN P DECOMP R / D Schlumberger Equipment. 12:00 - 14:30 2.50 CLEAN P DECOMP Held PJSM. Moved Out Schlumberger Unit, Mobilized and Spotted Halliburton Slickline Unit. R / U Halliburton Slickline Equipment. 14:30 - 16:00 1.50 CLEAN P DECOMP RIH w/2' - 1-7/8" Stem w/4.75" Centrilizer on Slickline. Tagged Up Hard at 9,560'. Attempted to Work Swedge Deeper with No Success. POOH w/4.75" Swedge on Slickline. 16:00 - 19:00 3.00 CLEAN P DECOMP Changed Out from 4.75" Swedge to 4.70" Gauge Ring. RIH w/ 4.70" Gauge Ring on Slickline. Tagged Up at 9,655', Worked Gauge Ring Through to 9,703'. Tagged Up at 9,703', Worked Gauge Ring Through to 9,770. POOH to 9,500', RIH to 9,703', Tagged Up at 9,703', Worked Gauge Ring Through to 9,770'. POOH w/4.70" Gauge Ring on Slickline. 19:00 - 21:00 2.00 CLEAN P ~DECOMP M / U Schlumberger's 4.75" Gauge Ring / Junk Basket onto :Slickline. RIH w/4.75" Gauge Ring / Junk Basket to 9,703'. ~Tagged Up Solid at 9,703', Attempted to Work Through with No Success. Jarred wi 500~ Overpull to Frae up at 9,703'. POOH wi 4.75" Gauge Ring / Junk Basket. 21:00 - 21:30 0.50 CLEAN P DECOMP R / D Halliburton Slickline Unit. 21:30 - 00:00 2.50 CLEAN P DECOMP Held PJSM. M / U Clean Out BHA: 4-3/4" Reverse Basket - Bit Sub - 4-3/4" String Mill - Flex Joint - 4-3/4" String Mill - XO - 2 x Junk Baskets - XO - XO - 3-3/4" Bumper Sub - 3-3/4" Oil Jars - 12 x 3-318" D.C. - XO - XO - XO - 2 x 9-5/8" Junk Baskets - XO. BHA Length 413.09'. 11/712002 00:00-02:30 2.50 CLEAN iP DECOMP RIH w/ Clean Out BHA on 5" DP to 9,380'. 02:30 - 05:30 3.001 CLEAN P DECOMP M I U Top Drive and Engaged Pumps. Established Parameters: Pump Rate 10 bpm, 2,850 psi, RPM 80, Torque Off Bottom 3,000 ft / lbs, String Weight Up 225,000~, String Weight Down 210,000~, String Weight Rotating 217,000~. Washed, Milled and Dressed Off 5-1/2" Liner from 9,380' to 9,773'; Worked the Mills Very Slowly through the Following Depths: 9,377' - 9,390' Top of 5-1/2" Liner, 9,530' - 9,580', 9,620' - 9,720', Took Weight at 9,660', Worked Mills from 9,620'- 9,690' 3 times, No Drag. 05:30 - 08:00 2.50 CLEAN :) DECOMP Pumped and Circulated Around 2 - 30 bbl Hi-Vis Barafiber Sweeps, 15 Minutes Apart. Pump Rate 11.5 bpm, 3,500 psi. No Losses. 08:00 - 08:30 0.50 CLEAN P DECOMP POOH wi Clean Out BHA to Top of 5-112" Liner at 9,370'. RIH without Pumps or Rotation to 9,773'. No Drag or Resistance while RIH. 08:30-10:30 2.001 CLEAN P DECOMP POOH w/ 5" DP to 400'. 10:30 - 12:00 1.50 CLEAN P DECOMP POOH w/BHA, Stood 3-3~8" DC in Derrick, Broke Out and L / D Junk Baskets, Casing Scraper, Jars, Bumper Sub and Mill. Cleaned out Junk Baskets, No Recovery from Junk Baskets. Printed: 12/6/2002 1:56:39 PM BP EXPLORATION page 7 ~r Operations Summa Report Legal Well Name: W-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYEN Rig Release: 11/29/2002 Rig Name: DOYEN 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 11/712002 12:00 - 12:30 0.50 CLEAN P DECOMP Held PJSM. R I U Schlumberger Equipment. 12:30 - 14:00 1.50 CLEAN P DECOMP RIH w/4.75" Gauge Ring and Junk Basket on E-Line to 9,750'. Made CCL - GR Logging Pass from 9,750' to 9,300'. POOH, No Recovery in Junk Basket. Broke off and L / D Junk Basket. 14:00 - 15:00 1.00 STWHIP P PROD1 M / U Baker 5-1/2" F-1 Retainer Production Packer to E-Line Tool String. : 15:00 - 17:00 2.00 STWHIP P PROD1 Held PJSM. RIH wi Baker 5-1/2" F-1 Retainer Production Packer on E-Line to 9,750'. Pulled Up Hole and Correlated to CCL - GR Log. Set Baker 5-112" F-1 Retainer Production Packer at 9,692', E- Line Measurements. Waited 7 Minutes for Explosive Charge to Set Packer. Packer in Place at 1625 hrs. POOH w/CCL-GR on E-Line. 17:00 - 18:00 1.00 STWHIP P PROD1 R / D Schlumberger Equipment. R / D Schlumberger Equipment. 18:00 - 21:30 3.50 STWHIP P PROD1 Held PJSM. M I U Whipstock BHA: 5-1/2" Casing Whipstock - 4.315" Starting Mill - 4-314" Window Mill - XO - 3-1/8" Drill Collars - Float Sub - XO - MWD - Reversible Flow Sub - XO - i Bumper Sub - 11 x 3-118" Drill Collars - XO - XO - Circulating Sub. BHA Length 428.32'. 21:30 - 22:00 0.50 STWHIP P PROD1 M / U 1 Stand of 5" DP, M / U Top Drive, Tested MWD, 147 gpm, 500 psi, OK. 22:00 - 00:00 2.00 STWHIP P PROD1 RIH wi Whipstock BHA on 5" DP to 4,025'. Tripping Speed 1-1/2 - 2 Minutes / Stand. 111812002 00:00 - 04:00 4.00 STWHIP P WEXlT Held PJSM. RIH wi Whipstock BHA on 5" DP to 9,619'. Tripping Speed 1-1/2 - 2 Minutes / Stand. Oriented Whipstock at 5-1/2" Liner Top at 9,370'. 04:00 - 06:30 2.50 STWHIP P WEXlT M / U Top Drive, Engaged Pumps, Established Parameters: Pump Rate 150 gpm, 800 psi, String Weight Up 235,000#, String Weight Down 215,000#. Oriented Whipstock 75 deg Left and RIH very slowly to 9,671' Tool Face Moved to 90 deg Left. Put a Slight Turn in Drill String and Picked up to 9,630', to Work Turn Down into Whipstock. Started Down, Whipstock Hung up at 9,639'. Worked Whipstock Up and Down with 10,000# Drag. Continued Down the Hole w/Whipstock at 65 - 70 deg Left Orientation. Whipstock oriented at 54 deg Left. Set Down wi 25,000# and Set Whipstock Anchor. Pulled Up to Confirm Anchor Set, Shear Bolt Connecting Mill to Whipstock Sheared as Anchor Set. Set Down and Pulled up to Confirm Whipstock is Set and Sheared. 06:30 - 09:30 3.00 STWHIP P WEXlT Held PJSM wi Peak Drivers and Rig Crew. Displaced to 8.4 ppg QuickDril Mud. Pump Rate 160 gpm, 700 psi. Circulated Mud System 1 Full Circulation, 8.4 ppg - In, 8.4 ppg - Out. 09:30 - 10:30 1.00 CASE P WEXIT iHeld PJSM. Closed Pipe Rams and Tested 9-518" x 5-112" ~Liner as Follows: Strokes Pmp'd Pressure 10 440 psi ~,_ _ -_ 20 920 psi,~ 30 1,400 psi 40 1,880 psi ? ~,.~ 50 2,360 ps! ~.~ 60 2,840 ps~ r psi "'> · ~'" 75 70 3,340 3,320 psi Printed: 12/6/2002 1:56:39 PM BP EXPLORATION Page 8 ~ Operations Summa Report Legal Well Name: W-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYEN Rig Release: 11/29/2002 Rig Name: DOYEN 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 111812002 09:30 - 10:30 1.00 CASE P WEXlT 78 3,500 psi Held Pressure f/30 minutes, OK. Bled down Pressure, Opened Pipe Rams. 10:30 - 15:00 4.50 STWHIP P WEXlT Milled Window from 9,665' to 9,677'. WOM 2,000~ - 5,000~, RPM 60 - 100, Torque Off Bottom 2,000 ff / lbs, Torque On Bottom 3,000 - 5,000 ft / lbs, Pump Rate 160 gpm, 750 psi. 15:00 - 20:00 5.00 STWHIP P WEXlT Milled Window and New Formation from 9,677' to 9,691'. WOM 8,000~ - 10,000~, RPM 110, Torque Off Bottom 2,000 ft / lbs, Torque On Bottom 3,000 - 5,000 ft / lbs, Pump Rate 160 gpm, 750 psi. 20:00 - 20:30 0.50 STVVHIP P WEXlT Made Several Wiper Trip Passes Through Window, With and Without Pumps to Ensure Good Window Cut. 5-1/2" Window Top 9,665', 5-112" Window Bttm 9,677' 20:30 - 23:00 2.50 STWHIP P WEXIT Pumped and Circulated Around 50 bbl Hi-Vis Sweep. Pump Rate, 160 gpm, 900 psi, Dropped Ball and Opened Circulating Sub Once Sweep Reached the Top of the 5-1/2" Liner. :Increased Pump Rate to 610 gpm, 860 psi. Circulated 2 x Bottoms Up Returns Over Shakers were Clean. Note: Recovered 40~ of Metal Cuttings. 23:00 - 23:30 0.50; EVAL P WEXIT Held PJSM. Closed Pipe Rams and Performed FIT. Strokes Pmp'd Pressure 2 120 psi ~, 4 240 psi \ ''~ {~ 8 360 psi~' '~---~ 10 460psi '~ \~,~ 12 560 psi~, ~,(3 ~ 13 593 psi "~ ~ MW 8.4 ppg, Window TVD 8,777', Pressure 593 psi = 9.7 ppg EMW. Held Pressure fl 10 minutes, Pressure at 10 minutes 593 psi. Bled down Pressure, Opened Pipe Rams. Flow Checked Well, Well Static. 23:30 - 00:00 0.50 STWHIP P WEXlT Held PJSM. POOH wi 5" DP to 9,300'. 111912002 00:00 - 01:00 1.00 STWHIP P WEXlT Held PJSM. Slipped and Cut Drilling Line. 01:00 - 05:00 4.00 STVVHIP P WEXlT POOH wi 5" DP to 400'. Calculated Fill 66.5 bbls, Actual Fill 68 bbls. Flow Check Well Every 20 Stands, Well Static. 05:00 - 06:30 1.50 STWHIP P WEXlT POOH, Broke Out and L I D Window Milling BHA. 06:30 - 07:30 1.00 BOPSUF P PROD1 Held PJSM. M I U Stack Washer, Washed and Jetted BOP Stack. M / U Retrieving Tool, Pulled Wear Bushing. R I U Equipment to Test BOPE. 07:30 - 10:30 3.00 BOPSUI:iP PROD1 Held PJSM. Tested BOPE. Tested Upper and Lower Rams, Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves and IBOP to 3,500 psi High 1250 psi Low. Tested Annular Preventer to 2,500 psi High / 250 psi Low. All Tests Held fl 5 Min. All Pressure Tests Held wi No Leaks or Pressure Loss. Witnessing of BOPE test Waived by AOGCC Rep Chuck Sheave. 10:30 - 11:00 0.50 BOPSUI; :~ PROD1 R I D BOPE Test Equipment. M ! U Retrieving Tool, Ran and Set Wear Bushing. 11:00 - 14:00 3.00 DRILL P PROD1 Held PJSM. M I U BHA: 4-3~4" STC MBT285QYPX PDC Bit, Set8 JS9376, dressed w/6x10 jets, 3-518" SperryDrill Lobe 718 2.3 stg Motor w! 2.12 deg Bent Housing, Non-Mag Float Sub - Non-Mag XO - SuperSlim Tm Bm Gm MWD - Reverse Flow Sub - Non-Mag MWD Flex Sub - Non-Mag XO - 3 x Flex Printed: 12/6/2(X)2 1:56:39PM BP EXPLORATION Page 9 ~ Operations Summa Report I Legal Well Name: VV-32 Common Well Name: W-32 Spud Date: 10/31/2002 Event Name: REENTER+COMPLETE Start: 10/31/2002 End: 11/29/2002 Contractor Name: DOYON Rig Release: 11/29/2002 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations .. 11/912002 !11:00 - 14:00 3.00 DRILL P PROD1 Collars - HE Drilling Jars - Circulating Sub - XO Sub - 30 Jts 2-7~8" DP -XO -XO. Total BHA Length - 1,123.39'. Set Motor Bend and Oriented to MWD. 14:00 - 15:00 1.00 DRILL P PROD1 M / U Top Drive and Tested MWD Tools, 160 gpm, 780 psi. No Pulse. 15:00 - 16:00 1.00 DRILL P PROD1 RIH wi 4-314" Directional BHA on 5" DP to 2,000'. M / U Top Drive, Tested MWD, 160 gpm, 780 psi. No Pulse. Lowered Pressure in Pulsation Dampener from 500 psi to 200 psi. Tested MWD, 160 gpm, 780 psi, No Pulse. 16:00 - 17:00 1.00 DRILL N DFAL PROD1 POOH w/5" DP. M / U Top Drive to BI-lA. Tested MWD, Pumped Hi-Vis Pill, 160 gpm, 780 psi, No Pulse. 17:00 - 21:00 4.00 DRILL N DFAL PROD1 POOH to MWD, Changed out Pulsers. RIH wi MWD on 1 Stand of 2-718" DP. M I U Top Ddve, Tested MWD 160 gpm, 780 psi, No Pulse. 21:00 - 22:00 1.00 DRILL N DFAL PROD1 POOH, Broke Out and L ! D Mud Motor. M I U Top Drive wi XO Directly Above MWD. Tested MWD, 160 gpm, 310 psi. No Pulse. 22:00 - 23:00 1.00 DRILL N DFAL PROD1 Changed Out Pulsers in MWD. M / U Top Drive and Tested MWD w/160 gpm, 310 psi, Very Weak Intermittent Pulse. 23:00 - 00:00 1.00 DRILL N DFAL PROD1 POOH, Broke out and L / D All MWD Tools and BHA. 11/10/2002 00:00 - 01:30 1.50 DRILL N DFAL PROD1 Held PJSM. Changed out MWD Tools. M I U DM Directional Pulser I Probe and DM Superslim Bottom Sub. Downloaded Data to Probe. 01:30 - 02:00 0.50! DRILL N DFAL PROD1 M I U Top Drive and Tested MWD. 160 gpm, 300 psi. Good Pulse and Read Out. 02:00 - 02:30 0.50: DRILL N DFAL PROD1 M I U Motor and PDC Bit and Oriented Tools. 02:30 - 03:00 0.50 DRILL N DFAL PROD1 RIH wi Directional BHA on 2-718" DP to 1,123'. M / U Top Drive and Tested MWD. 160 gpm, 780 psi. Good Pulse and Read Out. 03:00 - 03:30 0.50 DRILL N DFAL PROD1 Changed Out Handling Equipment to 5". RIH wi 4-314" Directional BI-IA on 5" DP to 1,700'. '03:30 - 06:30 3.00 DRILL P 'PROD1 RIH wi 4-3~4" Directional BHA on 5" DP to 9,600'. 06:30 - 07:00 0.50 DRILL P :PROD1 M / U Top Drive and Engaged Pump. Pump Rate 160 gpm, . il ,100 psi. Oriented Tools to 54 deg Left. Shut Down Pump and RIH to 9,691'. 07:00 - 00:00 17.00 DRILL P PROD1 Drilled 4-3/4" Directional Hole by Sliding from 9,691' to 10,~ WOB 10,000~ - 15,000~, Motor RPM 256, Pump Rat~,H~ gpm, SPP Off Bottom 1,450 psi, On Bottom l_.,1,.,7,r~Cpsi. String Weight Up 220,000~, String Weight D~3wn'205,0~. Pumped 30 bbl Hi-Vis Sweeps every 20~I:)~RT -- 0.0 hrs, AST = 14.40 hrs. ,~ 11/11/2002 00:00- 11:30 11.50 DRILL P PROD1 Drilled 4-3/4 e_bySliding from !0,150'to ~ Motor RPM 256, Pump Rate pm, SPP Off Bottom 1,450 psi, On Bottom 1,750 psi. J String Weight Up 229,000~, String Weight Down 205,000~. Pumped 30 bbl Hi-Vis Sweeps every 200'. 11:30 - 12:30 1.00 DRILL P ~ PROD1 Pumped 30 bbl Hi-Vis Sweep from Surface Back'to 5-112" Liner J Top at 9,377'. Pump Rate 160 gpm, 1,450 psi. Flow Checked DRiVeLL Well, Well Static. 12:30 - 14:00 ~ ~ PROD1 Held PJSM. POOH from 10,473' to 9,995' wi 10,000~ - 15,000~ Drag. M I U Top Drive and Pumped Out of the Hole from 9,995' J to 9,707', Pump Rate 170 gpm, 1,700 psi. POOH w/out Pumps from 9,707' to Window at 9,665' wi 5,000~ - 7,000~ Drag. Printed: 12/6/2002 1:56:39PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_ gA GEL DIESEL DOWN SQZ Pul~ tubing_ Alter casing_ Repair well _X Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 91 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 734' FNL, 1441' FEL, Sec. 21, T11N, R12E, UM (asp's 611789, 5959518) W-32 At top of productive interval 9. Permit number / approval number 2683' FNL, 1946' FEL, Sec. 16, T11N, R12E, UM (asp's 611228, 5962842) 189-091 At effective depth 10. APl number 2855' FNL, 1965' FEL, Sec. 16, T11N, R12E, UM (~ (asp's 611212, 5962670) 50-029-21970-00 At total depth 11. Field / Pool 2442' FNL, 1902' FEL, Sec. 16, T11 N, R12E, UM (asp's 611267, 5963083) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10240 feet Plugs (measured) TD Tag @ 9500' SL (10/08/2002) true vertical 9242 feet Effective depth: measured 9500 feet Junk (measured) TD Tag @ 9500' (03/10/2001) true vertical 8631 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 c.f. concrete 148' 148' Surface 2660' 13-3/8" 3840 c.f. 2698' 2698' Production 9617' 9-5/8" 2017 c.f. 9655' 8687' Liner 863' 5-1/2" 340 c.f. 9377' - 10240' 8435' - 9206' Liner Perforation depth: measured Open Perfs 9870' - 9880', 9885' - 9897', 9901' - 9955', 9966' - 9998' true vertical Open Perfs 8939' - 8947', 8951' - 8961', 8964' - 9009', 9018' - 9045' RECEIVED Tubing (size, grade, and measured depth) 3-1/2", g.2#, L-80 TBG to g306'. Tubing Tail @ g383'. Packers & SSSV (type & measured depth) 9-5/8" X 3-1/2" TIW HBBP Packer set @ 9306' MD.NOV 0 6 2002 3-1/2" landing nipple @ 2086' MD. .. _,,__ 13. Stimulation or cement squeeze summary /~li~r~ ulr~ ~.- ~ ................ Anchorage Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Shut-In Subsequent to operation Shut-In 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. .,w,~~~~~'D~ Title: Technical Assistant Date October 23, 2001 De ayne R. Schnorr ~_.__.- Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 09/26/2002 10/04/2002 10/07/2002 10/08/2002 10/10/2002 10/11/2002 10/12/2OO2 10/20/2002 10/22/2002 09/26/02 10/04/02 I O/O7/O2 10/08/02 W-32 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ANNCOMM --- T/I/O = 0/0/240. Monitor WHP's. (Trouble Well). NEW WELL SUPPORT: AC-LDS/POT; AC-PPPOT-IC NEW WELL SUPPORT: DRIFT/TAG; GAS LIFT--TO DUMMY VALVES; INFLATABLE BRIDGE PLUG NEW WELL SUPPORT: INFLATABLE BRIDGE PLUG NEW WELL SUPPORT: AC-FLUID LEVEL NEW WELL SUPPORT: TUBING CUT--JET/OTHER NEW WELL SUPPORT: AC-FLUID LEVEL SECURE WELL: AC-MONITOR NEW WELL SUPPORT: GEL TREATMENT --- OA EVENT SUMMARY ANNCOMM --- T/I/O = 0/0/240. MONITOR WHP's. (TROUBLE WELL). HUNG "TROUBLE WELL --- DO NOT FLOW" SIGN ON WING VALVE. T/IlO = SI/0/420 PPPOT-T PASSED (PRE-RWO DIAGNOSITICS). PRESSURED UP VOID TO 5000 PSI. AFTER 15 MINUTES THE PRESSURE WAS 5000 PSI AND AFTER 30 MINUTES THE PRESSURE WAS 5000 PSI. PPPOT-IC PASSED (PRE-RWO DIAGNOSTICS). PRESSURE UP VOID TO 3200 PSI. AFTER 15 MINUTES THE PRESSURE WAS 3150 PSI AND AFTER 30 MINUTES THE PRESSURE WAS 3150 PSI. D&T TOP OF IBP @ 9458' ELM COR W/2.50 CENT. PULL 1-1/2" DGLV-RA FROM STA-1 (LEAVE PKT EMPTY). LRS CIRCULATED THROUGH IA INTO TUBING. "PUMPED 5 BBLS METHANOL & 300 BBLS OF 120 DEGREE SEAWATER DOWN INNER ANNULUS." LOAD TUBING AND IA W/SALTWATER --- PULL IBP (RUBBER ELEMENTS LEFT IN THE HOLE) MAKE ONE ATTEMPT TO PULL ELEMENTS. (RUBBER ELEMENTS LEFT IN HOLE). NOTE ---> SQUARE SHOULDERED TOOLS ARE SETTING DOWN ON A SHOULDER AT 9306' SLM, ABLE TO BOBBLE PAST. PUMPED 5 BBLS OF METHANOL FOLLOWED BY 840 BBLS OF SEAWATER WITH 125 BBLS OF DIESEL FOR FREEZE PROTECTION IN THE INNER ANNULUS. PUMPED 10 BBLS METHANOL DOWN THE FLOWLINE FOR FREEZE PROTECTION. FREEZE PROTECT TBG WITH 22 BBLS METHANOL. <<< WELL LEFT SHUT-IN >>> Page I W-32 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 09/26/2002 ANNCOMM --- T/T/O - 0/0/240. Monitor WHP's. (Trouble Well). 10/10/02 TIO=VAC/VACNAC. MONITOR WHP's (TBG AND IA FL's FOR JOHN PETTY). TBG FL NEAR SURFACE. IA FL NEAR SURFACE. 10/11/02 STRING SHOT & CHEM CUT 3 1/2" TUBING @ 9275' MD (LEAVING 7' OF CLEAN STUB LOOKING UP FOR OVERSHOT). GOOD INDICATION OF CUT. NOTIFY PAD OPER OF STATUS - WELL TO REMAIN SHUT IN FOR RIG. 10/12/02 T/I/O = VACNACNAC TBG AND IA FL (FOR J MIDDENDORF) TBG FL @ 450', IA FL @ 475'. 10/20/02 T/I/O = SINACNAC MONITOR WHP's. PRE OA GEL JOB. 10/22/02 PLACED 2500# OF 100 MESH SAND, 1200# BENTONITE AND 8# LAMINATED CELLOFLAKE IN A 20 BBL GEL DIESEL SLURRY INTO THE OA, DISPLACED PILL WITH 15 BBLS DIESEL. SECURED WELL WITH 780 PSI OAP. FLUIDS PUMPED BBLS 3 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE EQUIPMENT (3 TESTS) 37 METHANOL 140 DIESEL 21 GELLED DIESEL W/1200# BENTONITE, 2500# 100 MESH, 8# CELLOFLAKE. 840 SEAWATER 1041 TOTAL Page 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_ CA GEL DIESEL DOWN SQZ Pull tubing_ Alter casing_ Repair well _X Other_ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development __X Exploratow__ Stratigraphic__ Service__ 4. Location of well at surface 734' FNL, 1441' FEL, Sec. 21, TllN, R12E, UM At top of productive interval 2683' FNL, 1946' FEL, Sec. 16, TllN, R12E, UM At effective depth 2855' FNL, 1965' FEL, Sec. 16, T11N, R12E, UM At total depth 2442' FNL, 1902' FEL, Sec. 16, TllN, R12E, UM (asp's 611789, 5959518) (asp's 611228, 5962842) (asp's 611212, 5962670) (asp's 611267, 5963083) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2660' Production 9617' Liner 863' Liner 10240 feet Plugs (measured) 9242 feet 9500 feet Junk (measured) 8631 feet 6. Datum elevation (DF or KB feet) RKB 91 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number \ W-32 9. Permit number / approval number 189-091 10. APl number 50-029-21970-00 11. Field / Pool Prudhoe Bay Oil Pool TD Tag @ 9500' SL (10/08/2002) TD Tag @ 9500' (03/10/2001) Size Cemented Measured Depth 20" 72 c.f. concrete 148' 13-3/8" 3840 c.f. 2698' 9-5/8" 2017 c.f. 9655' 5-1/2" 340 c .f. 9377' - 10240' True VerticalDepth 148' 2698' 8687' 8435'-9206' Perforation depth: measured Open Perfs 9870'- 9880', 9885'- 9897', 9901'- 9955', 9966'- 9998' true vertical Open Perfs 8939' - 8947', 8951' - 8961', 8964' - 9009', 9018' - 9045' Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 3-1/2", 9.2#, L-80 TBG to 9306'. Tubing Tail @ 9383'. 9-5/8" X 3-1/2" TIW HBBP Packer set @ 9306' MD. 3-1/2" landing nipple @ 2086' MD. RECEIVED 13. Stimulation or cement squeeze summary OCT 31 2002 Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure ~1~ 0il,& Gas 00rm. Commt.~tm~ 14. Representative Daily Averaqe Production or Injection Data J~C~10F'~lg(~ OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Shut-In Subsequent to operation Shut-In 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~,~~ ~;~~~ Title: Technical Assistant DeWayne R. Schnorr Date October 30 2001 Prepared by DeWayne R. Schnorr 564-5174 ;sOANNE; ,: NOV 0 5 2002 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE W-32 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS O9/26/2OO2 10/04/2002 10/07/2002 10/08/2002 10/10/2002 10/11/2002 10/12/2002 10/20/2002 10/22/2002 I O/24/2OO2 1 O/25/2OO2 10/25/2OO2 1 O/27/2OO2 1 O/28/2OO2 1 O/29/2OO2 ANNCOMM --- T/I/O = 0/0/240. Monitor WHP's. (Trouble Well). NEW WELL SUPPORT: AC-LDS/POT; AC-PPPOT-IC NEW WELL SUPPORT: DRIFT/TAG; GAS LIFT--TO DUMMY VALVES; INFLATABLE BRIDGE PLUG NEW WELL SUPPORT: INFLATABLE BRIDGE PLUG NEW WELL SUPPORT: AC-FLUID LEVEL NEW WELL SUPPORT: TUBING CUT--.IET / OTHER NEW WELL SUPPORT: AC-FLUID LEVEL SECURE WELL: AC-MONITOR NEW WELL SUPPORT: GEL TREATMENT --- OA NEW WELL SUPPORT: ATTEMPT; MIT-OA SECURE WELL: AC-MONITOR NEW WELL SUPPORT: GEL TREATMENT SECURE WELL: AC-MONITOR NEW WELL SUPPORT: AC-MITOA SECURE WELL: AC-MONITOR EVENT SUMMARY O9/26/02 ANNCOMM --- T/I/O = 0/0/240. MONITOR WHP's. (TROUBLE WELL). HUNG "TROUBLE WELL --- DO NOT FLOW" SIGN ON WING VALVE. 1 O/O4/O2 T/I/O = SI/0/420 PPPOT-T PASSED (PRE-RWO DIAGNOSlTICS). PRESSURED UP VOID TO 5000 PSI. AFTER 15 MINUTES THE PRESSURE WAS 5000 PSI AND AFTER 30 MINUTES THE PRESSURE WAS 5000 PSI. PPPOT-IC PASSED (PRE-RWO DIAGNOSTICS). PRESSURE UP VOID TO 3200 PSI. AFTER 15 MINUTES THE PRESSURE WAS 3150 PSI AND AFTER 30 MINUTES THE PRESSURE WAS 3150 PSI. 1 O/O7/O2 D&T TOP OF IBP @ 9458' ELM COR W/2.50 CENT. PULL 1-1/2" DGLV-RA FROM STA-1 (LEAVE PKT EMPTY), LRS CIRCULATED THROUGH IA INTO TUBING, "PUMPED 5 BBLS METHANOL & 300 BBLS OF 120 DEGREE SEAWATER DOWN INNER ANNULUS." I 0/08/02 LOAD TUBING AND IA W/SALTWATER --- PULL IBP (RUBBER ELEMENTS LEFT IN THE HOLE) MAKE ONE ATTEMPT TO PULL ELEMENTS. (RUBBER ELEMENTS LEFT IN HOLE). NOTE ---> SQUARE SHOULDERED TOOLS ARE SETTING DOWN ON A SHOULDER AT 9306' SLM, ABLE TO BOBBLE PAST. 8OANNED I'10V 0 200 Page I 1 O/8O/O2 (CONTINUED) 10/1 O/O2 10/11/02 10/12/o2 10/20/02 10/22/02 1 O/24/o2 10/25/O2 10/25/o2 1 O/27/O2 1 o/28/02 W-32 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PUMPED 5 BBLS OF METHANOL FOLLOWED BY 840 BBLS OF SEAWATER WITH 125 BBLS OF DIESEL FOR FREEZE PROTECTION IN THE INNER ANNULUS. PUMPED 10 BBLS METHANOL DOWN THE FLOWLINE FOR FREEZE PROTECTION. FREEZE PROTECT TBG WITH 22 BBLS METHANOL. <<< WELL LEFT SHUT-IN >>> TIO=VAC/VAC/VAC. MONITOR WHP's (TBG AND IA FL's FOR JOHN PETTY). TBG FL NEAR SURFACE. IA FL NEAR SURFACE. STRING SHOT & CHEM CUT 3 1/2" TUBING @ 9275' MD (LEAVING 7' OF CLEAN STUB LOOKING UP FOR OVERSHOT). GOOD INDICATION OF CUT. NOTIFY PAD OPER OF STATUS - WELL TO REMAIN SHUT IN FOR RIG. T/IlO = VAC/VAC/VAC TBG AND IA FL (FOR J MIDDENDORF) TBG FL @ 450', IA FL @ 475'. T/I/O = SI/VAC/VAC MONITOR WHP's. PRE OA GEL JOB. PLACED 2500# OF 100 MESH SAND, 1200# BENTONITE AND 8# LAMINATED CELLOFLAKE IN A 20 BBL GEL DIESEL SLURRY INTO THE OA, DISPLACED PILL WITH 15 BBLS DIESEL. SECURED WELL WITH 780 PSI OAP. PUMPED 20 BBLS OF DIESEL TO ATTEMPT A MIT ON THE OA TO 2400 PSI. MIT FAILED. LLR OF 0.5 BPM @ 1750 PSI. OA DOWNSQUEEZE (GELLED DIESEL/BENTONITE). T/I/O = 0/VAC/600, MONITOR WHP's POST MITOA. TIO= 0/VAC/525 (POST OA SQUEEZE). T/I/O=SI/VAC/550 MITOA TO 2400 PSI PASSED. OA FL AT SURFACE. PUMPED 17 GALS OF DIESEL TO PRESSURE OA TO 1000 PSI. OA LOST 70 PSI IN 15 MINUTES. PUMPED 24 GALS OF DIESEL TO PRESSURE OA TO 1500 PSI. OA LOST 60 PSI IN 15 MINUTES. PUMPED 27 GALS OF DIESEL TO PRESSURE OA TO 2000 PSI. OA LOST 45 PSI IN THE FIRST 15 MINUTES AND 55 PSI IN THE SECOND 15 MINUTES. OA LOST 50 PSI IN THE THIRD 15 MINUTES AND 30 PSI IN THE FOURTH 15 MINUTES. (FILLED UP AFTER ONE HOUR WAS 12 GALS/ LLR @ 0.2 GPM. SCANNEO !"}OV 0 5 2002 Page 2 W-32 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 10/28/02 (CONTINUED) PUMPED 12 GALLONS TO REPRESSURE OA TO 2020 PSI AND THE OA LOST 20 PSI IN THE FIRST 15 MINUTES AND 40 PSI IN THE SECOND 15 MINUTES. 30 PSI IN THE THIRD 15 MINUTES. 30 PSI IN THE FOURTH 15 MINUTES. MITOA TO 2400 PSI; PUMPED 24 GALS TO PRESSURE OA TO 2400 PSI. THE OA LOST 50 PSI IN THE FIRST 15 MINUTES. 20 PSI IN THE SECOND 15 MINUTES. PUMPED AT TOTAL OF 2.5 BBLS OF DIESEL. FINAL WHP's = Sl/VAC/0. 10/29/02 T/I/O = 0/0/460, MONITOR WHP's POST MITOA. FLUIDS PUMPED BBLS 3 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE EQUIPMENT (3 TESTS) 37 METHANOL 163 DIESEL 21 FIRST SQUEEZE --- GELLED DIESEL W/1200# BENTONITE, 2500# 100 MESH, 8# CELLOFLAKE. 65 SECOND SQUEEZE --- GELLED DIESEL W/1700# BENTONITE, 2500# 10 MESH SAND, 8# CELLOFLAKE. 840 SEAWATER 1129 TOTAL NOV 0 5 2002 Page 3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ Set Baker IBP, Ann-Comm Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 91 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 196612 Stratigraphic_ Anchorage, AK 99519-6612 service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 734' FNL, 1441' FEL, Sec. 21, T11 N, R12E, UM (asp's 611789, 5959518) W-32 At top of productive interval 9. Permit number / approval number 2683' FNL, 1946' FEL, Sec. 16, T11 N, R12E, UM (asp's n/a) 189-091 At effective depth 10. APl number 2526' FNL, 1913' FEL, Sec. 21, T11N, R12E, UM (asp's611211, 5962642) 50-029-21970 At total depth 11. Field / Pool 2442' FNL, 1902' FEL, Sec. 16, T11 N, R12E, UM (asp'$ 611267, 5963083) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10240 feet Plugs (measured) IBP set @ 9450' (05/22/2001) true vertical 9242 feet Effective depth: measured 9450 feet Junk (measured) TD Tag @ 9500' (03/10/2001) true vertical 8986 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 c.f. concrete 148' 148' Surface 2660' 13-3/8" 3840 c.f. 2698' 2698' Production 9617' 9-5/8" 2017 c.f. 9655' 8687' Liner 863' 5-1/2" 340 c.f. 9377' - 10240' 8435' - 9206' Liner Perforation depth: measured Open Perfs Below IBP 9870' - 9880', 9885' - 9897', 9901' - 9955', 9966' - 9998' true vertical Open Perfs Below IBP 8939' - 8947', 8951' - 8961', 8964' - 9009', 9018' - 9045' RECEIVED Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 TBG to 9306'. Tubing Tail @ 9383'. Packers & SSSV (type & measured depth) 9-5/8" X 3-1/2" TIW HBBP Packer set @ 9306' MD. JUN 3-1/2" landing nipple @ 2086' MD. 13. Stimulation or cement squeeze summary Alaska Oil & Gas Cons. Commissi0tl Intervals treated (measured) (see attached) Anchorage Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ Oil __X Gas __ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE W-32 Description of Work Completed NRWO OPERATIONS 01/20/2001 03/10/2001 03/11/2001 04/11/2001 04/14/2001 04/15/2001 04/22/2001 05/23/20010 6/02/2001 ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: ANN-COMM: PULL TTP (ANN COMM) DRIFT FOR CALLIPER (IN PROGRESS) CALIPER (ANN-COMM) EVAL LOW CA FL EVAL LOW CA FL EVAL LOW CA FL SET BAKER IBP BLEED IA/LOAD OA/PPPOT-IC EVAL LOW CA FLUID LEVEL SUMMARY 01/20/01 EQUALIZED AND PULLED XX PLUG FROM NIPPLE @ 9270' SLM WELL LEFT SHUT IN 03/10/01 DRIFTED TUBING W/11' X 2.50" DUMMY GUN. STOPPED IN LINER @ 9500' WLM. LDFN. CALIPER SURVEY TOMORROW. RETURNED WELL TO PCC & NOTIFIED OPERATOR OF STATUS. 03/11/01 RAN PDS CALIPER TOOL TO 9400' WLM (OUT END OF TUBING). SURVEY OUT OF HOLE @ 45'/MIN. GOOD DATA. RDMO. RETURNED WELL TO PCC & NOTIFIED OPERATOR OF STATUS. 04/11/01 TIC = 280/1170/1160. CA FL @ 2496' (CA SHOE @ 2698') 04/14/01 BLED CA FROM 1050 TO 600 PSI 04/15/01 BLED CA FROM 630 TO 280 PSI. CA FL @ 2496'. 04/22/01 SET 2.5" BAKER IBP IN 5.5" LNR @ 9450' 05/23/01 BLED IA TO 200 PSI. BLED CA TO 200 PSI. PPPOT-IC FAILED. 06/02/01 BLED TBG, IA, CA. POT-lC INDICATED BOTTOM SEAL IS COMPETENT. T/I/O - 280/240/500; IBP in TBG, TBG FL @ 7331' (63 bbls), IA FL @ 7610' (4'66 bbls), CA FL @ 876' (50 bbls). Bled TBG, IA, CA down to 0 psi. TBG tracked IA during bleed. Stung into lC hanger it had 2350 psi on it. Monitored ICP while bleeding down CA. ICP remained @ 2350 psi. Bled ICP to 0 psi. Final WHP's= 20/20/0. Fluids Pumped BBLS. Description 3 DIESEL FOR PFF 3 TOTAL LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLa/STP FINAL BL+RF 1 PLa/STP FINAL BL+RF 1 PLa/STP FINAL BL+RF 1 PLS FINAL BL+RF 1 PLa/STP FINAL BL+RF ECC No. Run # 1 3965.03 Run # 1 4457.04 Run # 1 4566.02 Run # 1 5670.04 Run # 1 6228.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wir~es ~- suzte 201 ~ Anchorage, AK 99518 ~/_~ // Or.AX to (907)563-7803 Received b~~ Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 16 November 1994 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ~ E-1 (24-32-12-14) ~,~(~W-32 (32-16-11-12) /~/D-14 C-38 (41-18-11-14) 1 PLS STP FINAL BL 1 PLS STP FINAL RF 1 PLS FINAL BL 1 PLS FINAL RF 1 PLS/GAS ENT. FNL BL 1 PLS/GAS ENT. FNL RF 1 PLS/GAS ENTRY FNL BL 1 PLS/GAS ENTRY FNL RF 1 PLS STP FINAL BL 1 PLS STP FINAL RF J-28 1 PLS FINAL BL 1 PLS FINAL RF W-30 (11-21-11-12) 1 PLS/GAS ENTRY FNL BL 1 PLS/GAS ENTRY FNL RF Please sign and re~-n 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Or FAX to (907) 563-7803 Received /~ - ECC No. Run # 1 Run # 1 2441.05 Run # 1 Run # 1 3965.02 Run # 1 Run # 1 4338.01 Run # 1 Run # 1 4979.04 Run # 1 Run # 1 5785.04 Run # 1 Run # 1 6046.01 Run # 1 Run # 1 6228.02 · BP EXPLORATION TOTAL: WELLG .NOT IN AOGCC COMpLIANCE~exel. Su.p,/H20 Inl./l/t/aiveral (sorted by dale) GL WELLS HOW SHOW THE SAME ......... ~ -- ..',,'-- .... '--,-,- ~'nlllJ.~ ~J~.l.r. 1~l,9 I I1~,,, II!1i~ rjr~jiijj~l~J1 IN,OLrrl nAT. %, SIZE/TYPE, '-'~' ~.,,-~ ~ '~-T P. PM ~v6a~s COMMEN'r~ FL OUT ....~....-. 6" CIW Rig and rig'camp proximity J-G3 ~1,'~3 275c 1 ~ 4 1/~ RQ O I1~ '- H 1 13 tent set sssv ~:L OUT .... ~ ctu/hcl acid treatment up Coming W-04 ""'-- Y;~4 , ;50(J 36 $1/2X L 7 11 tentsetsssvg.20.94 FL ouT 4" OlW ~U/l:~Ck. er stimulati°n up ~omlno ' W-15 GL 7/9/94 51 4 1/2 X OTIS L 6 g Ie~t sat sssv 9-20.94. OUT 3,". CIW FlOW back from acid j~ i, pfc, grass 7-05 ,,, W~BFJ4 .... 0 .....$1/2 X AX'ELSON L 7 12 tent set ~sv 9-'15-94 FL OUT K-VALVE ~ ~vaitir~l r,n I~rls for k-valve R-12 GL 7/24/94 19§0 78 23/8C OTIS L 2§ 400 :entset~$;vg-18-94 Fi. OUT 4..c,.~" !ul~ ~r~i.g ~t~p~ j~o -- Z-07a GL ?/~4/94 21 4 1/2 X OTIS i. 6 20 tent set $esv 9-20-94 F~. OUT 4; ClW ~ad down fcrr go-~ work well ~nt~oding J-28 8/2/94 , 2200 6,4 5 1/2 C AXEL$ON H 5 8 tent set sssv 9-20-94 FI {"ii. IT 4" CIW up coming aa~ i~fs ..... =--R'17 GL 8/8/94, 199~ 68 4 1/2 X AXELSON L 18 36 tenl set sssv 9-20=~ FL OUT _. 3" FMO up uu,;i,g logging and gl wo~ -- w.32 T 8/5/94 1760 67 31/2X BAKER L 8 $ tent, set ~w 9.20-~. $-112"c & 4-1/2" - CAMCO FLAPPERS ALL O1'11ER~ · OTIS Ball Valvuu (I.e. B & C, Lines are I~ ¢;ornmunlcalton) X - AOGCC; Waiver lo have .~,¢~V out (long-term SI well) · · ~ O4~H'I'ROL LINE MANIF-Oi.i~ INSTALLED OCt.- OONTINUOU$ CONTROL LINES EO5 - EMERGENCY OA$1NI~I SLIPS P-PILOT; D- Dual H-High Press L- Low Press REVISED: g/4/g4 ('1128: 5/g/g4 ) DB- DRILl_BY FAC - FACILITY GL - G~,$ LIFT C--¢3R - HIGH GAS/OIL RATIO MEC - MECHANICAL FAILURF_. - PROD ENGINEER LOW PI RCKS-~ SQZ- SQUEF_7~ WO- WATER CUT *° CHECK H'2S BEFORE WORKING ON WELl- J ANY WELLS ABOVE 20 PPM FtEQUtRE A SNIFF t PRIOR TO ~,C~IvlMENC~IIVGI OPERA TtON~. STATEOF ALASKA AND GAS CONSERVATION COMMISSI(. '" REPORT OF SUNDRY WELL OPEnATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing m Alter casing __ Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska)/nc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 735' SNL, 1442' WEL, SEC. 21, T11N, R12E At top of productive interval 2683' SNL, 1946' WEL, SEC. 16, T11N, R12E At effective depth 2526' SNL, 1913' WEL, SEC. 21, T11N, R12E At total depth 2441'SNL, 1911' WEL, SEC. 16, T11N, R12E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 90.86 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-32 (23-16-11-12) 9. Permit number/approval number 89-91 / 10. APl number 50- 029-21970 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2661' Intermediate 9619' Production -- Liner 10240' Perforation depth: measured 10240' feet 9242' feet Plugs (measured) 10199' feet Junk (measured) 9124' feet Size Cemented Measured depth 146' 2698' 9655' 20' 13-3/ 3840 c.f. 9-5/8' 2017 c.f. 5-1/2" 340 c.f. 93 77-10240 9901'- 9995', 9870'- 9880', 9886'- 9897', 9966'- 9978', 9978'- 9998' True vertical depth BKB 146' 2698' 8759' 9242-9151 true vertical subsea 8874'- 8955' (Five Intervals) Tubing (size, grade, and measured depth) 3-1/2"L-80 to 9381' Packers and SSSV (type and measured depth) TIW packer set @ 9306', SSSV set @ 2086' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED ,. , ...., ::;~ i:,i! ~. ~,,'.:.s Cons. Commis.~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 300 653 136 850 510 1196 950 1539 Tubing Pressure 265 275 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby ce, rtify that the foregoing is true and correct to the best of my knowledge. Signed (~/'l~,,~0)0..~v~ ~'~, "~ C{~%/-t~o Title Senior TechnicalAssistant/ Form 10-404 I~ev 06/15/88 / Date SUBMIT IN DOPLr'CATE 3/12/93 3/30/93 fjh 6/22/94 WELL W-32(23-16-11-12) Stimulation Operation A HCL/BIOZAN Acid Wash Treatment was performed using the following fluids: SUMMARY RIH WITH BHA LISTED BELOW. TIE INTO JEWELRY WITH TEL FOR DEPTH CONTROL. SI WING. TAG FILL AT 9929'. LIQUID PACK WELL WITH 33 BBLS SW. ABLE TO FLUFF FILL DOWN TO 9946'. PUMP 9.5 BBL 15% HCL/10% XYLENE AND WORK NZL TO 9956. SD LET ACID SOAK. PUMP 9 BBLS MORE HCL AND WORK NZL TO 9970. CHASE TO TT, WASH JEWELRY WITH 5 BBLS HCL. GOOD DEPTH CONTROL WITH TEL. OPEN WING. DIG 9970 TO 10000' WITH BIOZAN. CHASE SLUG TO SURFACE WITH SW. LEAVE WELL FLOWING. FLUIDS PUMPED vol. 23.8 25 PPT 315 25 33 DESCRIPTION 15% HCL/10% XYLENE W/0.4% ACI 274, 0.2% MS-10, 0.4% NE 41, 0.7% S-500, FERROTROL 210 FILTERED SEA WATER (Bbls) DOWN COIL 150,000 CPS MI BIOZAN METHANOL A PKR/CTU HCL/N2 Acid Wash Treatment was performed using the following fluids: SUMMARY RIH WITH BHA LISTED BELOW. STACK OUT AT 9327' CTMD (TIW PACKER). UNABLE TO WORK DOWN. POOH. CO PACKER AND BALL CATCHER FROM 2.125" TO 2.5" . UNABLE TO SEE WHAT WAS CATCHING. ON SECOND TRIP STACK OUT AT SAME AREA. PUMP DOWN BACKSIDE AND WORK THRU. DEPTH CONTROL INDICATIONS VERY WEAK. SET PACKER AT 9961'. OPEN CIRCULATION SUB ABOVE PACKER. PUMP FOUR 1000 GAL ACID STAGES PER PROGRAM. SAW SOME DIVERSION. PULL RELEASE PACKER AND POOH. RETURN WEIIJ TO PRODUCTION. NOTE: ALL FOUR EXTERNAL PACKER RUBBERS (2 ARE 2" X 2.5" DIA. AND 2 ARE 6" X 2.5" DIA) ARE IN WELL. FLUIDS PUMPED vol (GAL) 4000 25 4000 3000 13,000 33 DESCRIPTION 15% HCL/10% XYLENE W/0.4% ACI 274, 0.2% MS-10, 0.6% NE 41, 20 PPT FERR 300, PPT FERROTROL 210 FILTERED SEA WATER (OVERFLUSH) DOWN COIL W/0.2% NE 18 & 50 PPM SCALETROL 9C 75 QUALITY FOAM W/30 PPT AG-21R & 7 GPT FAW 16 FILTERED SEA WATER TO WORK COIL DOWN AND LIQUID PACK WELL METHANOL R£CE1VED ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 8 April 1994 Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION 1PLS STATIC FINAL BL PLS STATIC RF SEPIA 7 I-- '~ H-04 W-32 (32-16-11-12) /~CN/GR FINAL BLUELINE 1 CN/GR RF SEPIA 1 PDK/GR/CCL FINAL BL V~- PDK/GR/CCL RF SEPIA ~ CN/GR FINAL BLUELINE 1 CN/GR RF SEPIA 1 CN/GR FINAL BLUELINE Jl CN/GR RF SEPIA ECC No. Run # 1 4515.03 Run # 1 Run # 1 4112.02 Run # 1 Run # 1 3965.01 Run # 1 Run # 1 5665.03 Run # Run # 1 6154.00 Run ~ 1 1 CN/GR/CCL FINAL BL Run # 1 5761.02 Jl CN/GR/CCL RF SEPIA Run 1 CN/GR FINAL BLuELINE Run ~ I 5659.01 wi CN/GR RF SEPIA Run ~ 1 .. 1 PFC/CCL FINAL BL Run ~ 1' 3061.02 PFC/CCL RF SEPIA Run ~ i Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: RECEIVED Alaska Oil & Gas Cons. Commission Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 28 February 1994 RE: Transmittal of Data ECC #: 3965.01 Data: PDK-PORO Dear Sir/Madam, Reference: BP W-32 (32-16-11-12) ~_.~ ~ PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 Sent by U.S. MAIL C~PDK/GR LDWG TAPE+LST Run # 1 Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: STATE OF ALASKA AL~,,,~A OIL AND GAS CONSERVATION COMMISo,~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. '3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 735'SNL, 1442'WEL, SEC. 21, T11N, R12E At top of productive interval 2683'SNL, 1946'WEL, SEC. 16, T11N, R12E At effective depth 2526' SNL, 1913'WEL, SEC. 21, T11N, R12E At total depth 2441'SNL, 1911' WEL, SEC. 16, T11N, R12E 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10240fleet 9242~eet 101991eet 9124feet 5. Type of Well: Development X Exploratory Stratigraphic Service Plugs (measured) Junk (measured) 6. Datum elevation (DF or KB) KBE = 90.86 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-32 (23-16-11-12) 9. Permit number/approval number 89-91/ ,, 10. APl number 50- 029-21970 11. Field/Pool Prudhoe Oil Pool Casing Length Size Structural -- Conductor 110' 20' Surface 2661' 13-3/8" Intermediate 9619' 9-5/8' Production -- Liner 10240' Perforation depth: measured Cemented Measured de~h 146' 2698' 9655' 3840 2017a~ 5-1/2" 340 c.f. 9377-10240 9901'- 9995', 9870'- 9880', 9886'- 9897', 9966'- 9978', 9978'- 9998' True vertical depth BKB 146' 2698' 8759' 9242 - 9151 true vertical subsea 8874'- 8955' (Five Intervals) Tubing (size, grade, and measured depth) 3-1/2"L-80 to 9381' Packers and SSSV (type and measured depth) TlW packer set @ 9306', SSSV set @ 2086' 13. Stimulation or cement squeeze summary Intervals treated (measured) CEIVED FEB 1 § t~91 Alaska Oil & aas Cons. C0mmiss Subsequent to operation 1--5. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Treatment description including volumes used and final pressure Representative Daily Average Production or 10jecti0n Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to we II operation 530 1104 228 1044 750 1732 790 1214 Tubing Pressure 282 275 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that. the foregoing is true and correct to the best of my knowledge. Signed ~_~~ ^ ~ Title Supervisor Peripheral and EOA Group Form 10-404 Rev~6/15/88 Date~./~,~z/? / SUBMIT IN DtlPEICATE 311 WELL W-32 (32-16-11-12~ PBU STIMULATION OPERATION AN HCL pickle was performed on W-32 on Oct 1, 1990 on the following intervals: 9870'- 9880' MD BKB 9885' - 9897' MD BKB 9966'- 9998' MD BKB 9978'- 9998' MD BKB Fluid summary was as follows: 5 Bbls Nh4CL 18 Bbls Acid/Xylene 44 Bbls Diesel 199 Bbls Crude 8.5 Bbls Diverter 132 Bbls Acid mtp 02/06/91 RECEIVED & Gas Cons. 6ommissio~ Anchorage STATE OF ALASKA A KA OIL AND GAS CONSERVATION COMMI;. )N 1. Operations performed: Operation shutdown Stimulate Plugging Perforate x Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 735'SNL, 1442' WEL, SEC. 21, T11N, R12E At top of productive interval 2683'SNL, 1946' WEL, SEC. 16, T11N, R12E At effective depth 2526'SNL, 1913' WEL, SEC. 21, T11N, R12E At total depth 2441'SNL, 1911'WEL, SEC. 16, T11N, R12E Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service Other 6. Datum elevation (DF or KB) KBE,, 90.86 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-32 (23-16-11-12) 9. Permit number/approval number 89-91 / 90-259 10. APl number 50- 029-21970 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 10240'feet Plugs (measured) 9242'feet Effective depth: measured true vertical 10199'feet Junk (measured) 9124'feet Casing Length Structural -- Conductor 110' Surface 2661' Intermediate 9619' Production -- Liner 10240' Perforation depth: measured Size Cemented Measured depth 146' 2698' 9655' 20' 13-3/8" 3840 c.f. 9-5/8' 2017 c.f. 5- I/2" 340 c.f. 9377-10240 9901'- 9995', 9870'- 9880', 9886'- 9897', 9966'- 9978', 9978'- 9998' True vertical depth BKB 146' 2698' 8759' 9242 - 9151 true vertical subsea 8874'- 8955' (Five Intervals) Tubing (size, grade, and measured depth) 3-I/2"L-80 to 9381' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary TlW packer set @ 9306', SSSV set ~ 2086' 14. Intervals treated (measured) Treatment description including volumes used and final pressure Prior to well operation Reoresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure 630 856 110 876 229 Form 10-404 Rev 06/15/88 Subsequent to operation 1270 3471 598 0 261 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended Service 17' I hereby ceI~il-l-he~_~ is true and c°rrect t° the best °f mY kn°wledge' O~[ ( I Signed /[ {.v'L ~, Title Supervisor Peripheraland EOA Group . _ Date (.~ q (~ SUBMIT IN DUPLICATE '~' WELL W-32 (32-16.11-12~ PBU ADD'L. PERFORATION OPERATION We perforated the following intervals on May 11, 9870' - 9880' MD BKB 9885' - 9897' MD BKB 9966' - 9998' MD BKB 9978' - 9998' MD BKB 1990: mtp 9/10/90 BP EXPLORATION BP Exploration (Alaska) inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date:06-01/90 T#:81197 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-2 , PERF 05/13/90 #1 11100-11250 HLS 5" A-11 PERF 04/20/90 #1 9150-10025 HLS 5" H-11 PERF 04/19/90 #1 9000-9350 HLS 5" M-21 PERF 04/18/90 #1 9900-10240 HLS 5" W-11 PERF 05/09/90 #1 13114-13522 HLS 5" W-32 PERF 05/11/90 #1 9208-10020 HLS 5" Distribution: ARCOGEoSCIENCES OH V.ON R E¢ V E EXXON MOBIL PHILLIPS Alaska.0il & Gas Cons. commission ~ ;~nchorago ARC}lIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 56%5111 April 18, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well W-32 (32-16-11-12) Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustainment work on the well. Yours very truly, C. J. A. Lewis Supervisor Peripheral & EOA CJAL:MTP Enclosures (9) cc: L. Burke (MB12-1) Well File RE( E VED 'APR 2 31990 Oil & Gas Cons. Commission ~ ~nchora~ STATE OF ALASKA .... , SKA OIL AND GAS CONSERVATION COMMb. ,ON 1, Type of Request: Abandon Suspend ~ Alter casing ... Repair well~ Change approved program ~ "2. Name of Operator BP Exploration (Alaska) Inc. 3, Address P, O, Box 196612, Anchorage, Alaska 99519-6612 ' 4, Location of well at surface 735' SNL, 1442'WEL, SEC, 21, T11N, R12E At top of productive interval 2683'SNL, 1946' WEL SEC, 16, T11N, R12E At effective depth 2526'SN!., 1913' WEL, SEC21, T11N, R12E At total depth 2441'SNL, 1911' WEL SEC 16, T11N, R12E .... i 2. Present well condition summary Total depth: measured true vertical Operation Shutdown Plugging Pull tubing __ Variance__ 5. Type of Well: Development x Exploratory __ Stratigraphic Service Re-enter suspended well__ Time extension Stimulate Perforate x Other 6. Datum elevation (DF or KB) KBE = 90.86 feet 7, Unit or Property name Prudhoe Bay Unit 8. Well number W-32 (32-16-11-12) 9. Permit number 89-91 10. APl number 50- 029-21970 11. Field/Pool Prudhoe Oil Pool 10240' feet 9242' feet Plugs (measured) Effective depth: measured 10199' feet Junk (measured) true vertical 9124 feet Casing Length Size Cemented Measured depth Structural -- Conductor 110' 20 146' Surface 2661' 13-3/8" 3840 c.f. 2698' I ntermed iate 9619' 9-5/8" 2017 c.f. 9655' Production -- Liner 10240' 5-1/2" 340 c.f. 9377-10240 Perforation depth: measured 9901-9955 True vertical depth BKB 146' 2698 8759' 9242-9151 true vertical subsea 8874-8918 RECEIVE[;,, Tubing (size, grade, and measured depth) 3-1/2" L-80 to 9381' Packers and SSSV (type and measured depth) TIWpacker set at 9306', SSSV set at 2086' 13. Attachments Description summary of proposal x Detailed operations program APR 2 3 1990 Alaska 0il & Gas Cons. C0mmissl0l ~ ~ch0rage BOP sketch x 14. Estimated date for commencing operation 15. Status of well classification as: April 1990 ' 16. If proposal was verbally approved Oil X Gas ~ Name of approver Date approved Service 'i 7, I hereby certify that the foregoing is true and correct to the best of my knowledge. I Si~ned ~ Title SupervisorPeripheralandEOAGroup FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity__ BOP Test __ Mechanical Integrity Test__ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form required 10- <~4~ ~ ORIGINAL SIGNED BY !nN~'F r; SMITH Suspended __ Date lA?oval No. ApprOVed 1 SUBMIT IN TRIPLICATE WELL W-32 (32-16-11-12) PBU ADD'L. PERFORATION PROPQSAL We propose to perforate the following additional intervals during April 1990: 9870' -9880' MD BKB 9885' -9897' MD BKB 9966' -9998' MD BKB A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. mtp 4/19/90 'APR 2 3 ~9~ Alaska Oi~ & Gas Cor~so comr~i$sio~ Anchorag~ FLOW TUBES & PACKOFF BOWEN PACKOFF ~ ~-- HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE RISER GREASE /-"'MANIFOLD GREASE PUMP .,.~ GREASE RESERVOIR BOP BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: Distribution Date: 12/11/89 T# : 80677 FROM: Subject: Information Control Well Records LR2-1 BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-05 LEAK DET 11/23/89 #1 10450-10700 Camco W-32 PROD-F 11/27/89 #1 9800-10000 Camco 5~! 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCE HOUSTON MOBIL PHILLIPS ARCHIVES Alaska 0ii & (las Cons. Commissi~,~!, Anchorage BP EXPLORATION BP Exploration (Alaska)Inc. 900 East Renson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ARCHIVES DATE: 10/24/89 T%: 80519 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. E-13 BHP Pressure Report 10/16/89 Camco F-24 BHP Pressure Report 10/13/89 Camco W-32 BHP Pressure Report 10/09/89 Camco X-01 BHP Pressure Report 10/08/89 Camco Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON MOBIL O~ ALASKA~___._, GEOSCIENCES ARCHIVES DATE: 09/15/89 T#: 80356 BP OPEN HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. HOU/UNIT/STATE: F-22 DIL 09-07-89 #1 9229-10032 HLS 2'/5' F-22 BHCS 09-07-89 #1 9229-9997 HLS 2'/5" W_ 22 DSN 09-07-89 91 7703-9984 HAS 2"/5 ,~ -32 BHC/GR 09-11-89 #1 9616-10199 Atlas ,,, 2"/5" 32 CN/GR 09-11-89 #1 7240-10169 Atlas '~2"/5" ~W-3~ DIL/GR 09-11-89 ~1 9616-10228 Atlas STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Job#: Job#: Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 October 26, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well W-32 (32-16-11-12) Enclosed, in duplicate, is form 10-407, our Report of Well Completion for the above named well. This information reflects the current condition and status of the well. Enclosed are two copies each of daily drilling reports, directional and gyroscopic surveys, and open hole logs. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH Enclosures (4) J. Martin (MB 9-4) Well Records w/lO Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSI( [I R I G I N A L WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] S~ENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 89-91 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21970 4. Location of well at surface 9. Unit or Lease Name 735' SNL, 1442' WEL, SEC. 21, T11N, R12E Prudhoe Bay Unit At Top Producing Interval i'~. Well Number 2683' SNL, 1946' WEL, SEC. 16, T11N, R12E . VERIFIED' W-32 (32-16-11-12) ~,rrf_~/1~ ~~ 11. Field and Pool At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 2441' SNL, 1911' WEL, SEC. 16, T11N, R12E ~ ~,n,v'-, 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 90.86' I ADL 28263 12.' Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 08-26-89 09-10-89 09-18-89I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost I 10240'MD/9242'TVD 10199'MD/9209'TVD YES [] NO [] 2086feet MD I 1872' 22. Type Electric or Other Logs Run BHC/GR, CN/GR, DIL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Be'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond. Surface 11 O' 13-3/8" 68# L-80 Surface 2698' 17-1/2" 3840 cufl Cold Set III & II 9-5/8" 47# L-80 Surface 9655' 12-1/4" 2017 cufl Class G 5-1/2" 17# NT-80 9377' 10240' 8-1/2" 340 cufl Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET IMD) Schlumberger 3-3/8" @ 4 spf 3-1/2" 9.2# L-80 9381' 9306' MD TVDss w/tailpipe 9901'- 9955' 8874'- 8918' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED · 13-3/8"X 9-5/8" Arctic pack annulus w/180 bbls dry crude. 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) September 17, 1989 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL ~J~S-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED=1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence el oil, gas or water. Submit core chips. Form 10-407 in duplicate Rev. 7-1-80 ~INUED ON REVERSE SIDE 29. ,. 30. , 'G~~ MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. SAG 9648' 8754' SHUBLIK A 9681' 8781' ZONE 4 9809' 8888' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPI. ORN'ION Daily Drilling Report -- Prudhoe Bay Unit August 28, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 2550' Day: 2 48 - Hour Ftg: 2440' Current Operation: Drilling 17-1/2" hole. Accepted rig 1400 hrs. 8-26-89. Spudded well at 2200 hrs. 8-26-89. Drilled 17-1/2" hole with surveys to 2484'. Wells Shut-In for Drill-By: W-31 Mud Type: SPUD WT: 9.7 S,.UR ,VEY MD ANGLE 4 2000 3/4 VIS:ll3 PV:24 YP:31 FL: 11.6 Solids: 10 Temp: CF DIRECTION TVD SECTION COORDINATES DLS N85E 2000 8.83 S8.01 E6.86 - BP EXPLORATION Daily Drilling Report -- Prudhoe Bay Unit August 29, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 2710' Day: 2 24- Hour Ftg: 160' Current Operation: Nipple up split speed head. Drilled 17-1/2" hole to 2710'. Rigged up, ran and cemented 13-3/8" casing. Nippled down riser. Wells Shut-In for Drill-By: W-31 Mud Type: SPUD WT: SURVEY MD, ANGLE VIS: PV: YP: DIRECTION TVD FL: Solids: Temp: CF SECTION COORDINATES DL,~ BP EXPLOR~N Daily Drilling Report-- Prudhoe Bay Unit August 30, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AYE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 3300' Day: 4 24, Hour Ftg: 590' Current Operation: Drilling 12-1/4" hole. Nippled up and tested BOP's. Tested casing to 3000 psi. Drilled out cement and shoe. Performed LOT. Drilled 12-1/4" hole to 2800'. Kicked off and drilled 12-1/4" hole with motor to 3300'. Wells Shut-In for Drill-By: W-31 Mud Type: LOW SOLID WT: 9.3 ~I.~RVEy ,.MD, ANGLE 10 3076 11.2 VIS:36 PV:8 YP:9 FL: 15.8 Solids:25 Temp: ~F DIRECTION .TVD. SE~q'IQN COORDINATES DL$ N 11.SW 3073 29 N29 W3 - BP EXPLORN'ION Daily Drilling Report -- Prudhoe Bay Unit August 31, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 4755' Day: 5 24- HourFtg: 1455' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole with motor to 3797'. Reamed motor run. Drilled 12-1/4" hole with surveys to 4755'. Wells Shut-In for Drill-By: W-31 Mud Type: LOW SOLID WT: 9.4 $1.JRVEY MD ANGLE 15 3540 23.7 20 4026 30.8 VIS:35 PV: 8 YP:7 FL: 11.6 Solids: 8 Temp: °F DIREGTION TVD SE~-WION COORDINATES, DLS Nll.8W 3515 168 N165 W38 - N13.2W 3939 403 N394 W95 - BP EXPLORKTION Daily Drilling Report -- Prudhoe Bay Unit September 1, 1989 at 0600 hrs Rig' Audi 3 Well: W-32 (32-16-11-12) AYE # 125034 APE 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 5715' Day: 6 24- Hour Ftg: 960' Current Operation: Trip for bit. Drilled 12-1/4" hole with surveys to 5715'. Wells Shut-In for Drill-By: W-31 Mud Type: LOW SOLID WT: 9.5 SURVEY MD ANGLE 28 4787 31.2 VIS'36 PV:9 DIRECTION N11.6W TVD 4591 YP: 8 FL: 8.4 SE~ON 787 Solids: 8 Temp: °F COORDINATES DES N770 W179 - BP EXPLOR/;[ION Daily Drilling Report -- Prudhoe Bay Unit September 5, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 APl: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 8107' Day: 10 96- Hour Ftg: 2392' Current Operation: Trip for bk. Drilled 12-1/4" hole with surveys to 7360'. Motor run to 7646'. Drilled 12-1/4" hole with surveys to 8107'. Wells Shut-In for Drill-By: W-31 Mud Type: LOW SOLID WT: 9.8 $1JRVEY ~ ANGLE 30 4971 32.4 40 5895 28.2 50 ~6832 27.6 60 7771 '~ -32.9 VIS: 35 PV: 11 YP: 8 FL: 5.6 Solids: 10 Temp: °F DIRECTION TVD SECTION COORDINATES. DLS Nll.4W 4750 886 N868 W199 - Nll.3W 5547 1351 N1325 W291 0.46 N6.3W 6378 1783 N1750 W372 .84 Nll.7W 7188 2254 N2221 W413 - BP E~R.OR~N Daily Drilling Report .- Prudhoe Bay Unit September 6, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 8589' Day: 11 24- Hour Ftg: 482' Current Operation: Trip for bit. Tested BOP's. Drilled 12-1/4" hole with surveys to 8589'. Wells Shut-In for Drill-By: W-31 Mud Type: LSND WT: 9.8 SURVEY MD ANGLE 68 8522 33.4 VIS: 36 PV: 13 DIREqTF[QN N5.SW TVD 7817 YP: 10 FL: 5.9 SECTION 2665 Solids: 12 Temp: COORDINATES 2626 477 96°F DL$ BP I~.OR~N Rig: Audi 3 Well: W-32 (32-16-11-12) Daily Drilling Report-- Prudhoe Bay Unit September 7, 1989 at 0600 hrs AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: Current Operation: 0600 Depth: 9045' Day: 12 24- Hour Ftg: 456' Drilling 12-1/4" hole. Drilled 12-1/4" hole to 90451 Wells Shut-In for Drill-By: W-31 Mud Type: LSND WT: 9.8 SURVEY MD ANGLE 72 8899 34.3 VIS: 35 PV: 11 DIRECTION N5W TVD 8130 YP: 10 FL: 5.9 SECTION 2876 Solids: 12 Temp: COORDINATES N2836 W498 98~F DLS BP EXPLOR,~ON Daily Drilling Report-- Prudhoe Bay Unit September 8, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 9555' Day: 13 24- Hour Ftg: 510' Current Operation: Drilling 12-1/4" hole. Drilled 12-1/4" hole with surveys to 9555'. Wells Shut-In for Drill-By: W-31 Mud Type: LSND WT: 9.8 ~.,URVEY MD, ANGLE 78 9461 34 VIS: 36 PV: 13 DIRECTIQN N4.SE TVD 8597 YP: 10 FL: 5.0 SE(TrION 3185 Solids: 12 Temp: COORDINATES N3148 W501 98~F DLS i . BP EXPLOR~N Daily Drilling Report .- Prudhoe Bay Unit September 11, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 10240' Day: 16 72- Hour Ftg: 685' Current Operation: ~ to clean-out well. Drilled 12-1/4" hole to 9658' TD. Ran and cemented 9-5/8" casing. RU and tested BOP's. Drilled out cement and float equipment. Drilled 8-1/2" hole to 10240' TD. RIH and Iogged well. RD loggers. Wells Shut-In for Drill-By: W-31 Mud Type: LSND WT: 9.5 SURVEY MD_ ANGLE VIS: 38 PV: 9 YP: 8 FL: 11.5 Solids: 13 Temp: 102 °F DIRECTION TVD SECTION COORDINATES DLS~ BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit September 12, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 10240' Day: 17 24- Hour Ftg: 0 Current Operation: Made conditioning trip. Ran 5-1/2" liner in hole and cemented. POOH. TIH with 8-1/2" bit and scraper. Wells Shut-In for Drill-By: W-31 : Mud Type: LSND WT: 9.6 SURVEY MD ANGLE VIS:38 PV: 10 YP:9 FL: 10.8 Solids: 11 Temp: 100°F DIRECTION TVD SECTION COORDINATES. DLS BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit September 13, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 APl: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 0 Day: 18 24- Hour Ftg: 0 Current Operation: Cleaning pits. Cleaned out to top of liner. Tested to 3000 psi. Cleaned out liner. Tested casing to 3000 psi. Wells Shut-In for Drill-By: W-31 Mud Type: LSND WT: 9.5 SURVEY MD ANGLE VIS:26 PV: 5 YP: 6 FL: 16 Solids: 9 Temp' 98 °F DIRECTION TVD. SE~FION COORDINATES DLS BP EXPLOR~N Daily Drilling Report -- Prudhoe Bay Unit September 14, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-I2) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 10199' Day: 19 24- Hour Ftg: 0 Current Operation: Mill 5-1/2" liner top. Cleaned pits and displaced mud with brine. RIH with mill. Wells Shut-In for Drill-By: Mud Type: BRINE WT: 9.2 $~JRVEY MI), AN~LE VIS: PV: YP: FL: DIRECTION TVD SE~q~ION Solids: Temp: °F COORDINATES DLS BP EXPLOR~N Daily Drilling Report-- Prudhoe Bay Unit September 15, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 10199' Day: 20 24- Hour Ftg: 0 Current Operation: Flowing well to surface. POOH with mill. Rigged up and ran cased hole logs. Made up DP Conveyed guns and RIH. Spaced out guns and perforated well. Wells Shut-In for Drill-By: Mud Type: BRINE WT: 9.2 SURVEY MD AN(~LE VIS: PV: YP: FL: DIRECTION TVD SEGTION Solids: Temp: °F COORDINATES DLS BP EXPLOR~N Daily Drilling Report-- Prudhoe Bay Unit September 18, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE 4) 125034 API: 50-029-21970 AFE Amount: Current Amount: 0600 Depth: 10199' PB Day: 23 72- Hour Ftg: 0 Current Operation: Displace well with diesel Perforated well. Left 20' of Schlumberger's robing conveyed guns in hole. Push fish down hole to 10104'. Finish perforating with wireline guns. Run 3-1/2" robing. Test lines and flange to 5000 psi. Test tree to 5000 psi. Set and tested packer to 2500 psi. Wells Shut-In for Drill-By: W-31 Mud Type: BRINE WT: 9.2 SURVEY MD_ ANGLE VIS: PV: YP: FL: DIRECTION TVD SECTION Solids: Temp: COQRDINATE$, oF DLS BP EXFI..ORATION Daily Drilling Report -- Prudhoe Bay Unit September 19, 1989 at 0600 hrs Rig: Audi 3 Well: W-32 (32-16-11-12) AFE # 125034 APh 50-029-21970 AFE Amount: Current Amount: 0600Depth: 10199' PB Day: 24 24- Hour Ftg: 0 . Current Operation: Rig down to move to W-44. Rig release from W-32 1200 hrs. 9-18-89. Wells Shut-In for Drill-By: W-31 Mud Type: BRINE WT: 9.2 SURVEY MD ANGLE VIS: PV: YP: DIRECTION TVD Solids: Temp: °F COORDINATES DLS, ,I TELE£OI Teleco Oilfield $~ es of Alaska inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 October 5, 1989 JOB #714 BP EXPLORATION (ALASKA) INC. WELL: W-32 PRUDHOE BAY RIG: AUDI 3 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, · Jonathan Field Operations Supervisor JGM/el Enclosures A S~,,4~T COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 9-9-89 Company: BP EXPLORATION Well: W-32 Location: PRUDHOE BAY Rig: AUDI #3 TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 714tak 0.0° 30.0° 30.0° 353.0° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' TELECO TIE IN TO GLDD SINGLE SHOT- 2484 0 0.5 285.0 2483.88 -4.51 3.72S 6.71E 7.67 S 61.00E 0.00 TELECO BEHIND 2 DEGREE BENT SUB 2725 241 0.4 313.0 2724.87 -3.47 2.87S 5.08E 5.84 S 60.50E 0.10 2797 72 1.5 345.7 2796.86 -2.34 1.79S 4.66E 4.99 S 69.01E 1.64 2888 91 5.4 343.6 2887.68 3.06 3.47N 3.16E 4.70 N 42.27E 4.29 2981 93 8.3 343.6 2980.01 14.01 14.11N 0.03E 14.11 N 0.11E 3.12 i~ ..... PAGE 1 Company: BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Riq: AUDI #3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 3076 95 11.2 348.5 3073.63 29.97 29.74N 3.75W 29.97 N 7.19W 3.17 3169 93 13.8 346.8 3164.41 50.01 49.39N 8.08W 50.05 N 9.29W 2.82 3261 92 16.6 343.9 3253.19 73.90 72.70N 14.23W 74.08 N ll.08W 3.15 3352 91 18.7 344.6 3339.90 101.16 99.26N 21.71W 101.61 N 12.34W 2.32 3446 94 21.2 345.7 3428.25 132.93 130.26N 29.91W 133.65 N 12.93W 2.69 3540 94 23.7 348.2 3515.12 168.62 165.23N 37.98W 169.54 N 12.94W 2.85 3633 93 26.0 344.3 3599.51 207.41 203.16N 47.32W 208.60 N 13.11W 3.04 3727 94 29.8 346.4 3682.57 251.01 245.73N 58.39W 252.57 N 13.37W 4.16 TELECO MWD SURVEYS 3842 115 31.2 345.7 3781.65 308.94 302.37N 72.47W 310.93 N 13.48W 1.26 3933 91 31.0 346.4 3859.57 355.60 347.99N 83.81W 357.94 N 13.54W 0.45 4026 93 30.8 346.8 3939.36 403.07 394.46N 94.88W 405.71 N 13.52W 0.31 4120 94 30.6 346.4 4020.19 450.76 441.14N 106.00W 453.70 N 13.51W 0.30 4214 94 30.8 347.5 4101.02 498.48 487.89N 116.83W 501.68 N 13.47W 0.63 4309 95 30.5 347.1 4182.74 546.67 535.14N 127.48W 550.11 N 13.40W 0.38 PAGE 2 Company: BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Rig: AUDI ~3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 4408 99 30.4 347.8 4268.09 596.61 584.11N 138.38W 600.28 N 13.33W 0.37 4502 94 30.3 347.5 4349.21 643.90 630.51N 148.54W 647.77 N 13.26W 0.19 4596 94 30.4 347.5 4430.32 691.17 676.88N 158.82W 695.26 N 13.20W 0.11 4690 94 30.8 347.8 4511.23 738.81 723.62N 169.05W 743.10 N 13.15W 0.46 4784 94 31.2 348.4 4591.81 787.05 770.99N 179.03W 791.51 N 13.07W 0.54 4844 60 32.1 348.4 4642.88 818.43 801.83N 185.36W 822.98 N 13.02W 1.50 4971 127 32.4 348.6 4750.29 885.99 868.24N 198.87W 890.73 N 12.90W 0.25 5065 94 32.3 348.3 4829.70 936.13 917.52N 208.95W 941.01 N 12.83W 0.20 5159 94 31.6 349.2 4909.46 985.73 966.31N 218.65W 990.73 N 12.75W 0.90 5251 92 31.1 348.9 4988.03 1033.48 1013.30N 227.74W 1038.58 N 12.67W 0.57 5346 95 30.8 348.3 5069.50 1082.19 1061.19N 237.40W 1087.42 N 12.61W 0.45 5439 93 30.5 347.7 5149.51 1129.42 1107.57N 247.26W 1134.83 N 12.58W 0.46 5532 93 30.1 348.2 5229.81 1176.16 1153.45N 257.05W 1181.75 N 12.56W 0.51 PAGE 3 Company: BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Riq: AUDI #3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 5625 93 29.4 348.5 5310.55 1222.16 1198.65N 266.37W 1227.89 N 12.53W 0.77 5710 85 28.7 349.1 5384.86 1263.32 1239.14N 274.39W 1269.15 N 12.49W 0.89 5802 92 28.6 349.0 5465.59 1307.32 1282.44N 282.77W 1313.25 N 12.43W 0.12 5895 93 28.2 348.7 5547.40 1351.44 1325.84N 291.32W 1357.47 N 12.39W 0.46 5987 92 28.0 348.7 5628.55 1394.66 1368.34N 299.81W 1400.80 N 12.36W 0.21 6081 94 27.9 348.2 5711.58 1438.58 1411.51N 308.63W 1444.86 N 12.33W 0.28 6175 94 27.6 347.9 5794.77 1482.19 1454.33N 317.69W 1488.63 N 12.32W 0.35 6269 94 27.2 347.5 5878.23 1525.26 1496.60N 326.91W 1531.89 N 12.32W 0.47 6363 94 27.1 348.0 5961.87 1567.97 1538.52N 336.00W 1574.78 N 12.32W 0.27 6458 95 27.5 348.7 6046.29 1611.40 1581.19N 344.80W 1618.35 N 12.30W 0.54 6552 94 27.4 349.3 6129.70 1654.63 1623.73N 353.07W 1661.67 N 12.27W 0.31 6646 94 27.2 350.5 6213.23 1697.67 1666.17N 360.63W 1704.75 N 12.21W 0.62 6738 92 27.2 352.2 6295.06 1739.70 1707.74N 366.95W 1746.72 N 12.13W 0.84 PAGE 4 Company: .BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Riq: AUDI Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 6832 94 27.6 353.7 6378.52 1782.96 1750.67N 372.26W 1789.81 N 12.00W 0.85 6926 94 28.5 355.1 6461.48 1827.15 1794.66N 376.56W 1833.74 N 11.85W 1.19 7020 94 28.6 356.6 6544.05 1872.01 1839.46N 379.81W 1878.27 N 11.67W 0.77 7116 96 29.1 357.3 6628.13 1918.22 1885.72N 382.27W 1924.07 N 11.46W 0.63 7208 92 29.4 359.1 6708.40 1962.99 1930.64N 383.68W 1968.40 N 11.24W 1.01 7302 94 29.6 0.6 6790.22 2008.94 1976.93N 383.80W 2013.84 N 10.99W 0.81 TELECO BEHIND 2 DEGREE BENT SUB 7373 71 30.2 0.4 6851.77 2044.03 2012.32N 383.49W 2048.53 N 10.79W 0.86 7467 94 31.2 356.0 6932.60 2091.80 2060.26N 385.02W 2095.92 N 10.59W 2.61 7579 112 32.6 350.1 7027.71 2150.92 2118.93N 392.23W 2154.93 N 10.49W 3.05 TELECO MWD SURVEYS 7677 98 33.0 347.5 7110.08 2203.86 2171.01N 402.55W 2208.01 N 10.50W 1.50 7771 94 32.9 348.3 7188.96 2254.79 2221.00N 413.27W 2259.12 N 10.54W 0.48 7864 93 32.7 349.1 7267.13 2305.02 2270.40N 423.14W 2309.50 N 10.56W 0.51 7958 94 32.7 350.0 7346.23 2355.71 2320.34N 432.35W 2360.28 N 10.55W 0.52 PAGE 5 Company: BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Riq: AUDI ~3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 8040 82 32.9 351.1 7415.16 2400.09 2364.16N 439.63W 2404.69 N 10.53W 0.76 8146 106 33.6 351.4 7503.81 2458.18 2421.60N 448.47W 2462.78 N 10.49W 0.68 8240 94 33.6 351.3 7582.10 2510.18 2473.03N 456.30W 2514.77 N 10.45W 0.06 8334 94 33.2 351.3 7660.58 2561.90 2524.18N 464.12W 2566.49 N 10.42W 0.43 8428 94 33.2 352.7 7739.23 2613.36 2575.15N 471.29W 2617.92 N 10.37W 0.82 8522 94 33.4 354.2 7817.80 2664.96 2626.41N 477.17W 2669.41 N 10.30W 0.90 8616 94 33.9 354.5 7896.05 2717.04 2678.25N 482.30W 2721.33 N 10.21W 0.56 8710 94 34.1 354.1 7973.98 2769.59 2730.55N 487.52W 2773.73 N 10.12W 0.32 8805 95 34.2 353.9 8052.60 2822.91 2783.59N 493.10W 2826.93 N 10.05W 0.16 8899 94 34.3 355.0 8130.30 2875.79 2836.24N 498.21W 2879.67 N 9.96W 0.67 8987 88 33.2 356.4 8203.47 2924.63 2884.99N 501.88W 2928.32 N 9.87W 1.53 9085 98 33.1 358.0 8285.52 2978.07 2938.51N 504.49W 2981.51 N 9.74W 0.90 9179 94 33.5 359.5 8364.09 3029.41 2990.11N 505.61W 3032.55 N 9.60W 0.97 PAGE 6 Company: BP EXPLORATION, Well: W-32, Location: PRUDHOE BAY, Riq: AUDI Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 9273 94 34.2 0.5 8442.16 3081.38 3042.46N 505.60W 3084.19 N 9.44W 0.95 9367 94 34.0 3.0 8519.99 3133.46 3095.14N 503.99W 3135.90 N 9.25W 1.51 9461 94 34.0 4.4 8597.91 3185.13 3147.60N 500.59W 3187.16 N 9.04W 0.83 9556 95 33.8 6.4 8676.76 3236.88 3200.35N 495.61W 3238.50 N 8.80W 1.19 9597 41 33.8 7.8 8710.83 3259.00 3222.98N 492.79W 3260.44 N 8.69W 1.90 PAGE 7 TEL~dO 0 i t f i e 1 cl PLAN VIEW Ser'v~_ces 6400 BP EXPLORATION W-32 PRUDHOE BAY AUDI #3 JOB# 714tak/O0 SCALE: 1 inch = 800 feet + 9597 '~ 9461 ' 9085 '~ 8710 ' 8334 8040 7677 ' 7302 ' 6926 ' 6552 ' 6~75 ' 5802 5439 ' 5065 ' 4690 ' 4309 ' 3933 3540 2464 5600 48OO 4000 3200 z 2400 1600 800 800 400O 3200 24O0 '16(~? WEST 8OO 0 80O -1000 ~000 TF-L., O O }f e d Sepv ces VFBTICAL PROJFCTIO lO00 2000 3000 4000 5000 30OO 4000 ~'L'5ooo i ©6'000 >7000 SO00 9000 lO000 iiO00 I2484 ' .5 deg 2725' .4 deg BP EXPLORATION -~ 2901 ' 8.3 deg W-32 \ PRUDHOE BAY 3261 ' 16.6 deg AUDI #3 t3540' 23.7 deg JOB# 714tak/O0 ~ 3842 ' 31.2 deg SCALE: "~4120 ' 30.6 deg ~inch: ~000 feet -~k4408 ' 30.4 deg 4690 ' 30.8 deg 497! ' 32.4 deg 5251 ' 31.1 deg %5532 ' 30.1 deg 4~k,5802 ' 28.6 aeg 5081 27.9 deg 6363 ' 27.1 deg 6646 ' 27.2 6926 ' 28.5 deg 7208 ' 29.4 deg -~7467 ' 31.2 deg %7771 ' 32.9 deg 8040 ' 32.9 deg 8334 ' 33.2 deg 8616 ' 33.9 deg 8899 ' 34.3 deg 9179 ' 33.5 deg VERTICAL SECTION (fi) MICROFILMED GREAT Id%ND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY --mm mmmmmmmmmmmtmmmmm~~~ BP EXPLORATION COMPANY 0 R / 6_[ A_L .................. WEST EILEEN # W-32 WELL NAME PRUDHOE BAY mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm LOCATION AL889-D34 SINGLE SHOT & MWD 9/09/89 mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm JOB NUMBER TYPE SURVEY DATE DON LEJEUNE SUPERVISOR NAME TITLE SIGNATURE 500 FT 9597 FT DEPTH INTERVAL FROM TO 8/24/89 9/09/89 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTE$~ CONFIDENCE ' i>~:ii~.iii~!i'~?'i.~;~~' GREAT LAND DIRECTIONAL DRILLING,INC Client .............. : BP EXPLORATION Well ................ : WEST EIL.EEN ~ W-32 Vertical Section at.: N 7.00 W Mognettc Declination: 30 deg 0 mtn E Dota flle name ...... : 8:WW32D.DAT RECORD OF SURVEY IWell assumed verttcQl to MO of 9/08/89 Computotlon: RADIUS OF CURVATURE Sul-vey date: 8/29/89 Method ..... : SINGLE SHOT & NWD RKB Height.: 90.9 ft 0.0) MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION RELATIVE C~DRDINATES EPTH DG NN DEPTH DEPTH DIST ANGLE FRON WELL-HEAD 0 0 0 0.00 --90.86 0.00 N 0.00 E 0.00 N SO0 0 30 499.99 409.13 -1.19 S SO.O0 W 1.40 S 1001 0 30 1000.97 910.11 -4.70 S S.O0 W 5.18 S ]490 0 45 1489.95 1399.09 -8.21 N 80.00 E 8.30 S 2000 0 45 1999.90 1909.04 -8.15 N 85.00 E 7.43 S 0.00 E 1.67 W 3.64 W 0.23 W 6.38 E 2484 0 30 2483.87 2393.01 -4.S1 N 75.00 W 3.72 S 6.71E 2725 0 24 2724.86 2634.00 -3.41 N 47.00 W 2.81S S.07 E 2797 1 30 2796.85 2705.99 --2.33 N 14.30 W ' 1.80 S 4.47 E 2888 S 24 2887.67 2796.81 3.09 N 16.40 W 3.48 N 3.02 E 2981 8 18 2980.00 2889.14 14.03 N 16.40 W 14.12 N 0.11W 3076 11 12 3073.62 2982.76 3169 13 48 3164.40 3073.54 326] 16 36 325;3.18 3]62.32 . J352 18 42 3339.89 3249.03 3446 21 12 3428.24 3337.38 29.99 N 11.50 W 50.03 N 13.20 W 73.93 N '1.6.10 W 101.20 N 15.40 W 132.97 N 14.30 W 29.73 N 3.99 W 49.39 N 8.29 W 72.72 N 14.39 W 99.27 N 21.88 W 130.27 N 30.10 W 3540 23 42 3515.11 3424.25 3633 26 0 3599.49 3508.63 3727 29 48 3682.55 3591.69 3842 31 12 3781.64 3690.78 3933 3] 0 3859.56 3768.70 188.68 N 11.80 W 207.46 N 15.70 W 251.05 N 13.60 W 308.98 N 14.30 W 355.64 N 13.60 W 165.24 N 38.21W 203.19 N 47.49 W 245.73 N S8.61W 302.38 N 72.68 W 348.00 N 84.02 W 4026 30 48 3939.36 3848. SO 4120 30 36 4020.18 3929.32 4214 30 48 4101.01 4010.15 4309 30 30 4182.74 4091.88 4408 30 24 4268.08 4177.22 403.10 N 13.20 W 450.79 N 13.60 W 498.52 N 12. SO W S46.71 N 12.90 W 596.64 N 12.20 W 394.46 N 441.14 N 487.89 N 535.14 N 584.11N 95.08 W 106.21 W 117.04 W 127.69 W 138. S9 W CLOSURE DISTANCE DB MN S 0.00 N 0 0 0 E 2.18 S SO 0 0 W 6.33 S 35 4 38 W 8.30 S 1 36 40 W 9.80 S 40 39 48 E 7.67 S 60 SB S2 E S.80 S 60 58 30 E 4.82 S 68 3 S6 E 4.61 N 40 S6 24 E 14.12 N 0 27 24 W 29.99 N 7 38 37 W SO.OB N 9 31 60 W 74.13 N 11 11 45 W 101.66 N 12 25 SO W 133.71 N 13 0 -39 ~ 169.60 N 13 I 9 W 208.67 N 13 9 21W 252.63 N 13 24 57 W 310.99 N 13 30 S8 W 357.99 N 13 34 23 ~ _ 405.75 N 13 33 10 W 453.74 N 13 32 12 W S01.73 N 13 29 24 W 550.16 N 13 25 14 W 600.33 N 13 20 S2 ~ DOG LEG deg/100 0.000 O. 100 0.001 O. OS1 O. 000 O. 052 O. 041 1. S28 4. 286 3. 118 3.059 2.798 3.054 2.309 2.664 2. 694 2.601 4. 080 1. 228 O. 300 O. 243 O. 240 O. 373 O. 334 O. 207 WEST EILEEN ~ W-32 9/08/89 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH D]ST DIRECTION RELATIVE COORDINATES ANGIF FROM WFII.-HEAD 4502 30 ~.i~ 434~.20 4258.34 643.93 N 12.50 W 4596 30 24 4430.32 4339.46 691.21 N 12.S0 W ~690 30 48 4511.23 4420.37 738.85 N 12.20 W 4784 31 12 459].80 4500.94 787.09 N 11.60 W 4844 32 6 4642.88 4552.02 818.47 N 11.60 W 8210.51N 676.88 N 723.62 N 770.99 N 801.83 N 148.7!.: W IS9.03 W 169.26 W 179.25 W 185. S8 W 4~71 32 24 4750.28 4659.42 886.03 N 11.40 W 868.24 N 5065 32 18 4829.69 4738.83 936.17 N 11.70 W 917.52 N 5159 31 36 4909.45 4818.59 985.78 N 10.80 W 966.31 N 5251 31 6 4988.02 4897.16 1033.53 N 11.10 W 1013.30 N S346 30 48 5069.49 4978.63 ]082.24 N 11.70 W 1061.19 N ].99.09 W 209.16 W 218.86 W 227.96 W 237.6] W 5439 30 30 5149.50 S058.64 ]129.47 N 12.30 W ']107.57 N 5532 30 6 5229.80 S138.94 1176.21 N 11.80 W 1153.45 N 5625 29 24 5310.54 5219.68 1222.20 N Il.SO W 1198.65 N 5710 28 42 5384.85 5293.99 1263.37 N 10.90 W 1239.14 N 5802 28 36 5465.58 S374.72 1307.37 N 11.00 W 1282.45 N 247.47 W 257.27 W 266.58 W 274.60 W 282.98 W S895 28 12 5547.3~ 5456.53 1351.49 N ].1.30 W 1325.84 N 987 28 0 5628.55 SS37.67 1394.70 N 11.30 W 1368.34 N ~081 27 S4 57]1.58 S620.72 1438.62 N 11.80 W 1411.S0 N 6175 27 36 5794.77 S703.91 1482.22 N 12.10 W 1454.32 N 6269 27 12 5878.22 5787.36 1525.30 N 12.50 W 1496.59 N G363 27 6 5961.87 5871.01 1568.01 N 12.00 W 1538.50 N 6458 27 30 6046.28 S955.42 1611.44 N 11.30 W 1581.18 N 6552 27 24 6129.70 6038.84 1654.67 N 10.70 W 1623.71 N 6646 27 12 6213.23 6122.37 1697.71 N 9.50 W 1666.16 N ¢738 27 12 6295.06 6204.20 1739.75 N 7.80 W 1707.73 N 291.53 W 300.02 W 308.85 W 317.91 W 327_ 12 W 336.23 W 345.02 W 353.29 W 360.85 W 367.18 W 6832 27 36 6378.51 6287.65 1783.01 N 6.30 W 1750.86 N ~926 28 30 6461.47 6370.61 1827.19 N 4.90 W 1794.65 N 7020 28 36 ~544.04 6453.18 1872.06 N 3_40 W 1839.46 N 711~ 29 6 6628.]2 6537.26 ]918.27 N 2.70 W 1885.71N 7208 27 2~ ~708.37 66~7~53 ~3.0~ N O.?O W ~730.6.h N 372.49 W 376.80 W 380.05 W 382.S] W 383,~3 W CLOSURE DISTANC.:F E~; ~ S 6h7.81 N 13 16 29 W 695.31 N 13 ]3 18 W 743.15 N 13 9 S6 W 791.SS N 13 S 17 W 823.03 N 13 1 S3 W 8~0.77 N 12 S4 S3 W 941.04 N 12 50 31W 990.78 N 12 45 43 W 1038.62 N 12 40 42 W ]087.47 N 12 37 16 W ]134.88 N 12 35 42 W 1181.80 N 12 34 24 W ]227.94 N 12 32 19 W 1269.20 N 12 29 43 W 1313.29 N 12 26 36 W 1357.52 N 12 24 4 W 1400.84 N 12 22 2 W 1444.~0 N 12 20 32 W 1488.66 N 12 19 SO W ]531.92 N 12 19 47 W 1574.8I N 12 ].9 39 W 1618.38 N 12 18 34 W 1661.70 N 12 16 31 W 1704.79 N 12 13 13 W 1746.76 N 12 8 4 W 1789.85 N 12 0 42 W 1833.78 N 11 51 27 W 1878.31 N 11 40 25 W 1924.12 N 11 28 0 W ]9~8.~S N t~ t4 SO ~ LEG <J<~g/lO0 O. 134 O. 106 O. 434 O. 459 1.SO0 0.241 01140 0.790 O.SSO 0.357 0.363 0.451 0.757 0.839 0.112 O. 436 0.217 O. ]SB O. 326 O. 435 O. 153 O. 449 O. 172 O. 341 O. 386 O. 546 1. 016 O. 381 O. 549 O. $73 WEST EILEEN ~ W-32 9/08/89 RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH OG NN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGL.E FRON WEL.L-HEAD 7302 29 36 6790.21 6699.35 2009.00 N 0.60 E 1976.93 N 7373 30 12 6851.76 6760.90 2044.09 N 0.40 E 2012.32 N ( 7467 31 12 6932.58 6841.72 2091.87 N 4.00 W 2060.27 N 7579 32 36 7027.66 6936.80 2151.02 N 9.90 W 2119.00 N 7677 33 0 7110.04 7019.18 2203.96 N 12.50 W 2171.07 N 384.05 W 383.74 W 385.25 W 3f~;2.4 0 W 402.71 W 7771 32 54 7188.92 7098.06 2254.89 N 11.70 W 2221.06 N 7864 32 42 7267.09 7176.23 2305.13 N ].0.90 W 2270.46 N 7958 32 42 7346.19 7255.33 2355.82 N lO.O0 W 2320.40 N 8040 32 54 7415.12 7324.26 2400.19 N 8.90 W 2364.22 N 8146 33 36 7503.77 7412.9] 2458.29 N 8.60 W 2421.66 N 413.43 W 423.30 W 432.51W 439.81W 448.65 W 8240 33 36 7582.06 7491.20 2510.28 N 8.70 W 2473.09 N 8334 33 12 7660.54 7569.68 2562.01 N 8.70 W 2524.24 N 8428 33 ]2 7739.19 7648.33 2613.47 N 7.30 W 25'/5.2], N 8522 33 24 781.7.76 7726.90 2665.07 N S.80 W 2626.48 N 8616 33 54 7896.01 7805.15 2717.14 N S.SO W 2678.31N 456.47 W 464.30 W h'/1.4d W 477.35 W 482.48 W 8710 34 6 7973.94 7883.08 2769.69 N 5.90 W 2730.61N 3805 34 12 8052.56 7961.70 2823.02 N 6.10 W 2783.65 N 8899 34 18 8130.26 8039.40 2875.90 N S.O0 W 2836.31 N 8987 33 12 8203.42 8112.56 2924.74 N 3.60 W 2885.06 N 9085 33 6 8285.47 8].94.61 2978.18 N 2.00 W 2938.58 N 487.70 W 493.27 W 498.39 W 502.05 W S04.67 W 9179 33 30 8364.04 8273.18 3029.53 N O.SO W 2990.17 N 9273 34 12 8442.1]. 8351.25 3081.50 N O.SO E 3042.53 N 9367 34 0 8519.94 8429.08 3133.58 N 3.00 E 3095.20 N 9461 34 0 8597.87 8507.01 3185.22 N 4.S0 E 3147.65 N 9556 33 48 8676.72 8585.86 3236.96 N 6.40 E 3200.40 N 505.80 W 505.80 W 504.19 W 500.75 W 495.72 W CLOSURE DISTANCE DG IV~ S 2013.89 N 10 S9 37 W 2048.58 N 10 47 47 W 2095.98 N 10 35 29 W 2155.02 N 10 29 29 W 2208.]0 N ]0 30 30 W 2259.21 N 10 32 40 W 2309.5B N 10 33 39 W 2360.37 N 10 33 31 W 2404.78 N 10 32 17 W 2462.87 N 10 29 45 W 25]4.86 N 10 27 28 W 2566.58 N 10 25 20 W 2618.0] N 10 22 29 W 2669.S0 N 10 18 3 W 2721.42 N lO 12 43 W 2773.82 N 10 7 35 W 2827.02 N 10 2 55 W 2879.76 N 9 57 58 W 2928.41 N 9 52 18 W 2981.60 N 9 44 42 W 3032.65 N 9 36 3 W 3084.29 N 9 26 19 W 3136.00 N 9 1S 7 W 3]87.24 N 9 2 21W 3238.56 N 8 48 17 W DOG LEG deg/100 0.444 0.848 1.646 1.975 0.887 0.273 0.331 0.279 0.465 0.666 0.033 0.426 0.4bY 0.528 0.54] 0.251 0.125 0.387 1.338 0.497 0. 646 0.817 O. 858 O. 499 O. 654 9597 33 48 8710.79 8619.93 325~.08 N 7.80 E 3223.03 N 492.90 W 3260.S0 N B 41 42 W 1.057 WEST EILEEN ~ W-32 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 9/08/89 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL. DFPTH DEPTH DEPTH DIFF. CORRECT 91 91 0 0 0 191 ].91. 100 0 0 291 291 200 0 0 391 391 300 0 0 ~+91 491 400 0 0 591 591 SO0 0 0 691 691 600 0 0 79] 791 700 0 0 891 891 800 0 0 991 991 900 0 0 1091 1091 1000 0 0 1191 1191 1100 0 0 1291 1291 1.200 0 0 ]391 1391 1300 0 0 1491 1491 1400 0 0 1591 1591 1500 0 0 1691 1691 1600 0 0 1791 1791 1700 0 0 1891 1891 1800 0 0 1991 1991 1900 0 0 2091 2091 2000 0 0 2191 2191 2100 0 0 2291 2291 2200 0 0 2391 2391 2300 0 0 2491 2491 2400 .0 0 2591 2591 2500 0 0 2691 2691 2600 0 0 2791 2791 2700 0 0 9891 2891 2800 0 0 9992 2991 2900 1 I RELATIVE COORDINATES FROM WELL-HEAD 0.25 S 0.30 0.54 S 0.64 0.82 S 0.97 1.lO S 1.31 1.38 S 1.64 2.09 S 2.03 W 2.84 S 2.42 W 3.60 S 2.8:1. W 4.35 S 3.21 W S.11 S 3.60 W S.75 S 3.01 W 6.39 S 2.32 W 7.03 S 1.62 W 7.67 S 0.92 W 8.30 S 0.22 W 8.13 S 1.08 E 7.96 S 2.37 E 7.79 S 3.67 E 7.62 S 4.97 E 7.45 S 6.27 E 8.73 S 6.44 E 5.97 S 6.51 E S.20 S 6.58 E 4.43 S 6.65 E 3.69 S 6.66 E 3.32 S 5.98 E 2.94 S 5.30 E 1.88 S 4.52 E 3.85 N 2.91 E 15.93 N 0.56 W WEST EILEEN ~ W-32 DATA INTERPOLATED FOR EVEN 100 FEE]' OF SUBSEA DEPTH 9/O8/89 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 3094 3091 3000 3 2 3]96 3191 3100 S 2 3301 329] 3200 10 S 3406 3391 3300 IS S 35]4 3491 3400 23 8 3623 359~ 3500 32 3737 3691 3600 46 14 3853 3791 3700 62 16 3969 3891 3800 78 16 4086 3991 3900 95 17 4202 4091 4000 111 16 4318 419]. 4100 127 16 4h34 429] 4200 143 qSSO 4391 4300 159 16 4666 4491 4400 175 16 4783 4591 4500 192 17 4901 4691 4600 210 18 S019 4791 4700 228 18 S137 4891 4800 246 18 5254 4991 4900 263 17 S371 S091 SO00 280 17 S487 519~ SIO0 296 16 5602 S291 S200 311 1S S717 5391 5300 326 15 S831 5491 5400 340 14 S944 S591 SSO0 353 13 605~ S691 S600 367 14 6171 S791 S700 380 13 ~283 S891 S800 392 12 ~396 S991 S900 405 13 RELATIVE CL'~DRDINATES FRC~ WELL-HEAD 33.46 N 4.81W 56.34 N 10.11W 84.26 N 17_65 W 117.16 N 26.62 W 155.48 N 35.94 W 199.3~ N 46.S4 W 2S0.4B N 59.79 W 307.78 N 74.03 W 366.22 N 88.36 W 424.20 N ].02.17 W 482.02 N S39.80 N S97. ]4 N 654.32 N 711.85 N 115.68 W 128.73 W 141.44 W 154.03 W 166.69 W 770.44 N 831.S0 N 893.42 N 954.93 N 1014.97 N 179.13 W 191.61 W 204.24 W 216.60 W 228.29 W 1073.58 N 1131.20 N 1187. ~;3 N 1242.36 N 1295.85 N 240.25 W 252.52 W 264.31W 275.23 W 285.~2-W 1348.40 N 1400.73 N 1452.31 N 1502.92 N 1553.16 N 296.08 W 306. c~4 W 317.48 W 328. SO W 339.2S W WEST EIL.EEN N W-32 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH ~/08/89 MEAS. TRU VERT SUB SEA ~;)-lVD VFRTICA[~ DEPTH DEPTH DEPTH DIFF. CORRECT 6S08 6091 6000 417 12 66~1 6191 6100 430 13 6733 6291 6200 442 12 ~846 6391 6300 455 69S9 6491 6400 468 13 7073 6S91 6S00 482 14 7188 6691 6600 497 1S 7303 6791 6700 S12 1S 7418 6891 6800 S27 IS _, 7S36 6991 6900 S4 S 18 7654 7091 7000 S63 18 7773 7191 7100 S82 19 7892 7291 7200 601 19 8011 7391 7300 620 19 8131 7491 7400 640 20 8251 7591 7500 660 20 8370 7691 7600 679 19 8490 7791 7700 699 20 8610 7891 7800 719 20 8730 7991 7900 739 20 8851 8091 8000 760 21 8972 8191 8100 781 21 9091 8291 8200 800 19 9211 8391 8300 820 20 933~ 8491 8400 841 21 9453 8591 8500 862 21 9573 8691 8600 882 20 REI. A]'IVF CC~DRI')1NATFS FROM WELL-.HEAD :1603.91 N 1654.79 N 1705.60 N 1757.21 N 1810.60 N 349.44 W 358.83 W 366.85 W 373.13 W 377.96 W 1865.21N 1920.83 N 1977.30 N 2035.52 N 2096.27 N 381.42 W 383.62 W 384.04 W 384.47 W 38~. 63 W 2158.94 N 2222.29 N 2285.47 N 2348.80 N 2413.30 N 400.31 W 413.68 W 426.07 W 437.24 W 447.36 W 2478.82 N 2S43.89 N 2608.92 N 2674.90 N 2742.03 N 457.35 W 467.06 W 475.33 W 482.14 W 488.90 W 2809.61 N 2876.68 N 2942.12 N 3008.16 N 3075.52 N 495.79 W S01.42 W S04.75 W S05.80 W 504.79 W 3142.93 N 3209.79 N 501.Od W 494.SS W WEST E]L. EEN ~/ W-32 DATA INTERPOLATED FOR EVEN 1000 FEET OF MEASURED DEPTH 9108189 MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH 1000 1000 909 2000 2000 1909 3000 2999 2908 4000 3917 382d ~000 S640 SS49 7000 6S26 (5435 8000 7381 7290 9000 8214 8123 RELATIVE COORDINATES FROM WELL-HEAD S.~7 S 3.63 W 7.43 S (5.38 E 17.24 N 0.89 W 381.47 N 91.99 W 883.44 N 202.20 W 1374.31 N 1829.92 N 2342.84 N 2892.16 N 301.24 W 379.36 w 43(5.2S W S02.40 W 500 1500 2000 2500 3000 3500 T 4000 V 4500 D 5000 VERTICAL SECTION BP EXPLORATION WEST EILEEN # W-32 SECTION AT N 7.00 W TVD SCALE: 1 inch = 1000 feet DEP SCALE: 1 inch : 1000 feet DRAWN : 9/08/89 #arker Identification Hi) T~D DEPRT Al ~ 0 0 0 BI ~ 9597 ~! 3259 5500 6000 6500 7000 7500 BO00 8500 9000 -500 0 500 tO00 1500 2000 2500 3000 Depantune 3500 4000 4500 5000 5500 Harken Identification Iql) ~D DEPF~T AJ ~ 0 0 0 PLAN VIEW BP EXPLORATION NEST EILEEN # W-32 CLOSURE: 3261 ft N 8.? W DECLINATZON: 30.00 deg E SCALE: t inch = 500 feet DRAWN : 9/08/89 3250 3000 2750 2500 2250 2000 1750 1500 1250 t000 75O 500 250 25O ;17.50 ;!500 2;/50 2000 t750 i500 1250 tO00 750 500 250 0 250 ORIGINAL S UB.$ URFA CE DIRECTIONAl. SURVEY ~]UIDANCE F~ONTINUOUS [-~OOL NICROFILMED Company BP EXPLORATION Well Name W-32 (32-1,6-11-12) (732' SNL~1442' WEL,SEC 21~TllN~R12E) Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference No. Date 73480 14-SEP-89 Log{3ed By; Computed B~: WEBER KOHRTNG GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ~P EXPLORATIgN W-32 (32-16-11-12) PRUDHDE 5AY NORTH SLOPE, ALASK~ SURVEY DATE: l~-SEP-89 ENGINEER: WEBER METHODS gE COMPUTATION TOOL LgC~TION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. gIST. PROJECTEO ONTO A TARGET AZIMUTH CF NORTH ? DEG ~3 MIN WEST COMPUTATION DATC:~ 20-SEP-B9 PAGE BP EXPLORATION W-32 (32-16-11-123 PRUDMOE 8AY NORTH SLOPEr ALASKA DATE OF SURVEY: 14-SEP-89 KELLY BUSHING ELEVATION: 90.B6 FT ENGINr-ER: WEEER ' INTERPOLATEO VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA CSURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -90.86 0 0 N 0 0 E 100.00 100.00 9.14 0 6 N 24 21 W 200.00 200.00 109.14 0 9 S 84 4.2 W 300.00 300.00 209.14 0 13 S 49 8 W 400.00 400.00 309.14 0 16 S 30 35 W 500.00 500.00 409.14 0 8 S 52 10 W 600.00 600.00 509.14 0 12 S 74 40 W 700.00 700.00 60'9.14 0 6 S 72 21 W 800.00 800.00 709.14 0 12 S 67 5 W 900.00 900.00 809.14 0 5 N 75 34 W 1000.00 1000.00 909.14 1t00.00 1100.00 1009.14 1200.00 1200.00 1109.14 1300.00 1299.99 1209.13 1400.00 1400.00 1309.14 1500.00 1499.99 1409.13 1600.00 1599.99 1509.13 1700.00 1699.99 1609.13 1800.00 1799.99 1709.13 1900.00 1899.98 1909.12 C I2 S 77 49 W 0 6 N 7t 55 E 0 lO S 33 12 .~ 0 10 N 4 25 E 0 11 S 56355 0 12 S 79 6 E 0 26 S 77 25 E 0 27 S 66 $ E 0 29 S 66 3! E 0 33 S 75 40 E 2000.00 1999.98 1909.12 2100.00 2099.93 2009.12 2200.00 2199.98 2109.12 2300.00 2299.97 2209.11 2400.00 2399.98 2309.12 2500.00 2499.97 2409.11 2600.00 2599.97 2509.11 2700.00 2699.97 2609.11 2800.00 2799.97 2709.11 2900.00 2899.81 2808.95 0 26 S 79 40 E 0 19 S 46 56 E 0 13 S 46 35 E 0 8 S 41 14 E 0 9 S 23 18 E 0 10 S II 6 E 0 10 S 66 59 E 0 12 N 43 5 E 0 44 N 32 28 W 5 25 N 15 54 W 3000.00 2999.04 2908.18 8 35 3100.00 3097.45 3006.59 11 42 3200.00 3194.79 3103.93 14 40 3300.00 3290.81 3199.95 17 42 3400.00 3385.38 3294.52 20 14 3500.00 3478.46 3387.60 22 38 3600.00 3569.74 3478.38 25 32 3700.00 3658.86 3568.00 28 42 3800.00 3745.38 3654.52 31 3 3900.00 3830.81 3739.95 31 24 N 16 49 W N 11 55 W N 14 30 W N 16 9 W N 14 57 W N 13 48 W N 14 16 W N 15 22 W N 15 OW N 14 59 W VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE" SECTION SEVERITY NORTH/SOUTH EAST/WE.ST DIST. AZIMUTH FEET 9EG/IO0 FEET FEET FEET DEG MIN 0.00 O.O0 0.00 N 0.00 E 0.10 0.00 0.10 N 0.01 E O.ZO 0.25 0.19 N 0.11 W 0.10 0.00 0.05 N 0.41 W -0.18 0.00 0.28 S 0.67 W -0.49 0.62 0.61 S 0.83 W -0.42 0.81 0.57 S 1.06 W -0.65 0.58 0.82 S 1.23 W -0.52 0.95 0.73 S 1.45 W -0.72 0.73 0.95 S 1.64 W 0.00 N 0 0 E 0.10 N 7 18 E 0.22 N 30 32 W 0.41 N 83 10 w 0.72 S 6T 35 1.03 S 53 46 ~ 1.21 S 61 54 W 1.48 S 56 21 W 1.62 S 63 24 W 1.90 S 59 57 W -0.52 0.81 0.77 S 1.78 W -0.68 0.29 0.94 S 1.89 ~; -".56 0.47 0.84 S 1.96 W -0.65 0.65 0.91 S 1.83 W -0.69 0.46 0.95 S 1.86 W -0.70 1.25 0.91 S 1.48 W -0.97 0.05 1.11 S 0.96 W -1.32 0.21 1.37 S 0.27 W -1.72 0.27 1.66 S 0.54 E -2.11 0.07 1.94 S 1.42 E 1.~4 ' 66 35 W 2.11 S 63 40 W 2.13 S 66 54 w 2.04 S 63 38 W 2.09 S 62 58 W 1.74 S 58 33 W 1.47 S 40 50 W 1.39 S 11 1 W 1.74 S 17 54 E 2.40 S 36 13 E -2.44 0.53 2.16 S 2.28 E -2.88 0.31 2.54 S 2.71 E -3.29 0.30 2.91 S 3.07 E -3.~bO 0.75 3.19 S 3.28 E -3.,E33 O.OZ 3.40 S 3.45 E -4.05 0.40 3.61 S 3.54 E -4.19 1.19 3.74 S 3.61 E -4.12 1.33 3.65 S 3.74 E -3.58 1.80 3.15 S 3.42 f 1.33 4.52 1.62 N 2.08 E 3.14 S 46 35 E 3.72 S 46 52 E 4.23 S 45 31 E 4.58 S 45 51 E 4.84 S 45 26 ~ 5.05 S 44 24 5.19 S 43 59 E 5.23 S 45 43 E 4.65 S 47 2.3 E 2.64 N 52 4 E 13.47 3.90 13.39 N 31.09 3.02 30.60 N 53.83 3.98 52.83 N 81.44 2.48 79.66 N 113.60 2.53 110.94 N 149.96 2.89 146.30 N 190.45 2.32 185.96 N 235.38 3.90 229.67 N 285.10 1.05 278.09 N 336.66 0.32 328.29 N 1.48 W 13.47 N 6 18 W 5.75 W 31.13 N 10 39 W 11.00 W 53.97 N 11 46 W 18.61 W 81.81 N 13 9 W 27.32 W 114.25 N 13 50 W 36.43 W 150.76 N 13 59 W 46.03 W 191.57 N 13 54 W 58.01 W 236.89 N 14 11 W 71.03 W 287.02 N 14 20 W ~34.49 W 338.99 N 14 26 W COMPUTATION DATE: 20-SEP-89 PAGE 2 BP EXPLORATION W-32 (32-16-11-123 PRUOHOE 'BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 14-SEP-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINEER: WEEER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SE& COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 4000.00 3916.41 3825.55 30 54 4100.00 4002.32 3911.46 30 40 4200.00 4088.24 3997.38 30 54 4300.00 4174.14 4083.28 30 42 4400.00 4260.17 4169.31 30 35 4500.00 4346.37 4255.51 30 19 4600.00 4432.76 4341.90 30 13 4700.00 4518.97 4428.11 30 49 4800.00 4604.56 4513.70 31 27 4900.00 4689.45 4598.59 32 20 5000.00 4773.87 4683.01 32 27 5100.00 4858.49 4767.63 31 54 5200.00 4943.57 4852.71 31 19 5300.00 5029.13 4938.27 31 4 5400.00 5114.98 5024.12 30 37 5500.00 5201.20 5110.34 30 11 5600.00 5287.97 5197.11 29 3l 5700.00 5375.31 5284.45 28 48 5800.00 5463.07 5372.21 28 31 5900.00 5551.0l 5460.16 28 22 6000.00 5639.14 5548.28 27 59 6100.00 5727.56 5636.70 27 47 6200.00 5816.15 5725.29 27 27 6300.00 5905.03 5814.17 17 7 6400.00 5993.94 5903.0~ 27 19 6500.00 6082.75 5991.89 27 23 6600.00 6171.59 6080.72 27 19 6700.00 6Z60.48 6169.62 27 9 6800.00 6349.38 6258.52 27 26 6900.00 6437.87 6347.01 28 8 7000.00 6525.87 6435.01 28 30 7100.00 6613.63 6522.77 28 50 7200.00 6700.99 6610.13 29 18 7300.00 6788.14 6697.28 29 31 7400.00 6874.80 6783.94 30 24 7500.00 6960.61 6869.75 31 28 7600.00 7045.33 6954.47 32 41 7700.00 71!9.16 7039.30 33 12 7800.00 7213.05 712!.19 32 52 7900.00 7297.14 7206.28 32 36 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN N 14 24 W 387.97 N 14 4 W 43qj.83 N 13 48 W ,489.69 N 13 42 W 540.61 N 13 34 W 591.31 N 13 32 W 641.73 N 13 2:,3 W 691.84 N 13 1 W 742.28 N 12 29 W 793.79 N 12 8 W 846.48 N 1Z 4 W 899.93 N 12 6 W 953.05 N 12 13 W 1005.45 N 12 16 W 1057.05 N 12 15 W 1108.17 N 12 0 W 1158.68 N 11 40 W 1208.25 N 11 23 W 1256.84 N 11 19 W 1304.69 N 11 44 W 1352.17 N 12 4 W 1399.32 N 12 24 W 1445.88 N 12 40 W 1492.11 N 12 43 W 1537.77 N 12 16 W 1583.37 N 11 16 W 1629.22 N 10 10 W 1675.09 N B 43 W 1720.85 N 7 3 W 1766.63 N 5 55 W 13313.20 N 4 2E) W 1860.64 N 2 54 W 1908.48 N 1 22 W 1956.90 N 0 14 E 2005.55 N i 5 W 2055.00 N 5 40 W 2106.17 N 10 42 W 2159.28 N 12 46 W 2213.64 N 12 1 W 2267.88 N 1D 56 W 2321.88 0.34 0.53 0.35 0.43 0.36 0.40 0.39 0.85 0.71 0.53 378.30 N 97.59 W 390.68 N 14 28 W 427.92 N 110.16 W 441.87 N 14 26 W 477.58 N 122.46 W 493.03 N 14 23 W 527.31 N 134.63 W 544.23 N 14 19 W 576.))5 N 146.65 W 595.20 N 14 16, W ~ 626.13 N 1'58.49 W 645.88 N 14 12 W 675.10 N 170.27 W 696.24 N 14 9 W 724.43 N 181.88 W 746.92 N 14 6 W 774.87 N 193.27 W 798.6.1 N 14 0 W 826.51 N 204.53 W 851.44 N 13 54 W 0.59 0.45 0.51 0.27 0.31 0.75 0.49 0.34 0.21 0.48 878.93 N 215.74 W 905.02 N 13 47 W 931.03 N 226.87 W 958.28 N 13 42 W 982.41 N 237.94 W 1010.81 N 13 37 W 10133.00 N 248.92 W 1062.56 N 13 33 W 1083.11 N 259.80 W 1113.83 N 13 29 W 1132.63 N 270.45 W 1164.47 N 13 26 W 11331.28 N 280.63 W 1214.15 N 13 22 W 1229.00 N 290.35 W 1262.83 N 13 18 W 1276.01 N 299.74 W 1310.74 N 13 13 W 1322.64 N 309.23 W 1358.31 N 13 10 W 0.58 0.18 0.61 0.16 0.52 0.46 0 0.72 0.93 0.91 1368.90 N 318.98 W 1405.57 N 13 7 W 1414.54 N 328.89 W 1452.27 N 13 5 W 1459.83 N 338.96 W 1498.67 N 13 4 W 1504.54 N 349.05 W 1544.50 N 13 4 W 1549.21 N 359.00 W 1590.26 N 13 3 W 1594.21 N 368.36 W 1636.21 N 13 1 W 1639.34 N 376.92 W 1682.12 N 1Z 57 W 1684.4~) N 384.50 W 1727.82 N 12 51 W 1729.84 N 390.84 W 1773.44 N 12 44 W 1776.11 N 396.09 W 1819.74 N 1Z 34 W 0.79 0.93 1.05 0.81 2.18 2.74 2.73 0.76 0.62 0.91 1823.41 N 400.41 W 1866.86 N 12 23 W 1871.26 N 403.51 W 1914.27 N 12 10 W 1919.88 N 405.31 W 1962.20 N 11 55 W 1968.91 N 405.72 W 2010.28 N 11 39 W 2018.81 N 405.77 W 2059.18 N I1 22 W 2070.05 N 408.74 W 2110.02 N 11 10 W 2122.63 N 416.26 W 2153.06 N 11 6 W 2175.93 N 427.70 W 2217.57 N 11 7 W 2229.09 N 439.41 W 2271.98 N 11 9 W 2282.11 N 450.19 W 2326.09 N 11 10 W C3MPUTATION DATE: 20-SEP-89 PAGE 3 BP EXPLORATION W-32 (32-16-11-123 PRUDHOE B~Y NORTH SLOPE, ALASKA D~TE OF SURVEY: 1~-SEP-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINEER: wEBER INTERPOLATED VALUES FOR EVEN 100 FEET DF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH OEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET 'FEET DEG MIN 8000.00 7381.36 7290.50 32 41 8100.00 7465.28 7374.42 33 19 8200.00 7548.61 7457.75 33 41 8300.00 7631.96 7541.10 33 1'9 8400.00 7715.63 7624.77 33 10 8500.00 7799.29 7708.43 33 17 8600.00 7882.63 7791.77 33 50 8700.00 7965.51 7874.65 34 6 8800.00 8048.33 7957.47 34 8 8900.00 8131.08 8040.22 34 4 N 9 57 W 2375.74 N 9 25 W 2430.09 N 8 59 W 2485.36 N 8 34 W 2540.59 N 8 7 W 2595.36 N 7 O W 2550.13 N 5 40 W 2705.38 N 5 59 W 2761.31 N 6 11 W 2817.33 N 5 41 W 2873.¢5 0.35 0.86 0.36 0.51 0.50 0.58 0.37 0.23 1.08 2335.15 N 459.88 W 2380.00 N 11 8 W 2388.75 N 469.03 W 2434.37 N 11 7 W 2443.33 N 477.88 W 2489.63 N 11 4 W 2497.93 N 486.28 W 2544.83 N 11 I W 2552.12 N 494.28 W 2599.55 N 10 58 W 2606.41 N 501.50 W ~654.22 N 10 53 W 2661.35 N 507.50 W 2709.31 N 10 48 W 2717.03 N 513.12 W 2765,.06 N 10 42 W 2772.75 N 519.09 W 2820.93 N 10 36 W 2828.58 N 525.03 W 2876.89 N 10 31 W 9000.00 8214.33 8123.47 33 6 9100.00 8298.25 820'7.39 33 9200°00 8381.87 8291.01 33 29 9300.00 8466.96 8374.10 34 1 9400.00 8547.71 8456.85 34 I0 9500°00 8630.62 8539.76 33 55 9600.00 8713.68 8622.82 33 36 9700.00 8796.7~) 8705.93 33 44 9800.00 8880.23 8789.37 33 9900.00 8963.57 8872.71 33 58 N 3 46 W 2928.77 N 2 24 W 2982.98 N I 8 W 3037.52 N 0 24 E 3092.71 N 2 22 E 3148.15 N 4 58 E 3202.95 N 7 31 E 3256.98 N 10 5 E 3310.26 N 10 30 E 3362.62 N 9 15 E 3~+15..31 1.58 0.85 1.02 1.24 4.14 1.60 1.47 1.56 0.61 1.30 2883.79 N 5.29.60 W 2932.02 N 10 24 W ,2938.10 N 532.46 W 2985.96 N 10 16 W 2992.91 N 534.15 W 3040.20 N 10 7 W 3048.55 N 534.58 W 30'95.07 N 9 57 W 3104.68 N 533.23 W 3150.14 N 'g ~5 W 3160.47 N 529.60 W 3204.54 N 9 31 W 3215.81 N 523.53 W 3258.15 N 9 15 W 3270.75 N 514.92 W 3311.03 N 8 57 W 3324.94 N 504.91 W 3363.06 N 8 38 W 3379.39 N 495.42 W 3415.51 N 8 20 W 10000.00 9046.17 8955.31 34 37 10100.00 9128.15 9037.29 35 14 10200.00 9209.65 9118.79 35 29 lOZ40.O0 9242.22 9151.36 35 29 N 8 25 E 3469.35 N 7 20 E 3524.48 N 6 51 E 3580.53 N 6 51 E 3503.01 0.69 1.15 0.00 0.00 3435.10 N 486.80 W 3469.42 N 8 4 W 3491.80 N 478.87 W 3524.49 N 7 49 W 3549.32 N 471.81 W 3580.54 N 7 34 W 3572.38 N 469.04 W 3603.04 N 7 29 W COMPUTATION DATE'. 20-SEP-:B9 PAGE BP EXPLORATION W-32 (32--16-11-12) PRUDHOE BAY NORTH SLOPE~ ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH PEG MIN DEG M[N DATE OF SURVEY: 14-SEP-B9 KELLY BUSHING ELEVATION: gO.B6 FT ENGINEER: WEBER INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDiN~'TES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/IIEST DIST. AZIMUTH FEET PEG/lO0 FEET FEET FEET PEG MIN 0.00 0.00 -90.86 0 0 1000.00 1000.00 909.14 0 12 2000.00 1999.99 1909.12 0 26 3000.00 2999.04 2908.18 8 35 4000.00 3916.4'1 3525.55 30 54 5000.00 4773.87 4683.01 32 27 6.000.00 5639.14 5548.2~ 27 59 7000.00 6525.8T 6435.0! 28 30 8000.00 73~1.36 7290.50 32 41 9000.00 8214.33 8123.47 33 6 N [) 0 E 0.00 S 77 49 W -0.52 S 79 40 E -2.44 N 16 49 W 13.47 N 14 24 Id 387.97 N 12 4 W 899. ~3 N 12 4 W 1399.32 N 4 28 W 1860.64 N 9 57 W 2.375.74 N 3 46 W 2928.77 10000.00 9046.17 8955.31 34 37 10240.00 9242.22. 9151.36 35 29 N :3 25 E 3469.35 N 6 51 E 3603.01 0.00 0.81 0.53 3.90 0 0.59 0.58 0.79 0.35 1.58 0.00 N 0.00 E 0.00 N 0 0 E 0.77 S 1.78 W 1.94 S 66 35 W 2.16 S 2.28 E 3.14 S 46 35 E 13.39 N 1.48 W 13.4T N 6 18 W 378.30 N 97.59 W 390.68 N 14 28 W )~ 878.93 N 215.74 W 905.02 N 13 47 W -" 1368.90 N 318.98 W 1405.57 N 13 7 W 1823.41 N 400.41 W 1866.86 N 12 23 W 2335.15 N 459.88 Id 2380.00 N 11 8 W 2883.79 N 529.60 W 2932.02 N 10 24 W 0.69 0.00 3435.10 N 486.80 W 3469..42 N ~l 4 ii 3572.38 N 4.69.04 W 3603.04 N ? 2.9 ii COMPUTATION DATE: 20-SEP-89 PAGE 5 BP EXPLORATION W-3Z (32-16-11-123 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 14-SEP-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINEER: WEBER INTERPOLATED VALUES FOR EVEN 10:0 FEET DF SUB-SEA DEPTH TRUE SUB-SE~ COURSE MEASURED V~RTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -90.86 0 0 N 0 0 E 90.86 90.86 0.00 0 6 N Z¢ 11 W 190.86 190.86 100.00 0 8 N 87 13 W 290.86 290.86 ZO0.O0 0 13 S 50 55 W 390.86 390.86 300.00 0 16 S 31 48 W 490.86 490.86 400.00 0 9 S 35 44 W 590.86 590.86 500.00 0 1I N 85 33 W 690.86 690.86 600.00 0 7 S 46 43 W 790.86 790.86 700.00 0 12 S 87 40 W 890.86 890.86 800.00 0 6 S 70 57 W 990.86 990.86 900.00 1090.86 1090.86 1000.00 1190.86 1190.86 1100.00 1290.87 1290.86 1ZOO.O0 1390.86 1390.86 1300.00 1490.87 1490.86 1400.00 1590.87 1590.86 1500.00 1690.87 1690.86 1600.00 1790.87 1790.86 1700.90 1890.88 1890.86 1800.00 0 11 N 76 42 W 0 4 S 79 2 E 0 10 S 51 31 W 0 10 N 25 39 E 0 11 S 43 56 E 0 11 N 83 26 E 0 25 S 77 10 5 0 27 S 62 26 : 029 s6655 ~. 0 33 S 71 49 E 1990.88 1990.86 1900.00 2090.88 2090.86 2000.00 2190.98 2190.86 2100.00 2290.89 2290.86 2.200.00 2390.89 2390.~6 2300.00 2490.~9 2490.86 2400.00 2590.89 2590.86 2500.00 2690.89 2690.86 2600.00 2790.39 2790.86 2700.00 2891.01 2890.86 2800.00 0 27 S 81 14 E 020 S 44 29 5 015 S 5t 95 0 10 S 49 22 E 0 8 S 27 53 E 0 9 S Z 5 W 0 10 S 34 0 E 0 11 N 78 18 E 0 35 N 37 33 W 4 59 N 15 11 W 2991.73 2990.86 2900.00 8 16 3093.28 3090.86 3000.00 11 30 3195.94 3190.86 3100.00 14 31 3300.05 3290.86 3200.00 17 42 3405.83 3390.86 3300.00 20 24 3513.44 3490.86 3400.00 23 0 3623.46 3590.86 3500.00 26 3 3736.70 3690.86 3600.00 29 55 3853.19 3790.86 3700.00 31 25 3970.21 3890.S6 3800.00 31 0 N 16 57 W N 11 56 W N 14 23 W N 16 9 W N 14 52 W N 13 39 W N 15 6 W N 15 I W N 15 3 W N 14 32 W VERTICAL DOGLEG SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. FEET DEG/IO0 FEET FEET RECTANGULAR COORC.iNATES HORIZ. DEPARTURE ' -0.53 0.97 0.77 S 1.75 W -0.68 0.61 0.94 S 1.91 W -0.55 0.4,9 0.82 S 1.94 W -D.67 0.66 0.93 S 1.83 W -0.67 0.41 0.93 S 1.89 W -0.70 0.90 0.91 S 1.51 W -0.95 0.18 1.10 S 1.02 W -1.28 0.50 1.34 S 0.33 W -1.68 0.24 1.6,3 S 0.46 E -2.08 0.00 1.91 S 1.33 E -2.42 0.3.1 2.1~ S 2.21 -2.84 0.36 2.50 S 2.68 -3.26 0.4~ 2.88 S 3.04 -3.58 0.81 3.17 S 3.26 -3.81 0.08 3.38 S 3.44 -4.03 0.52 3.59 S 3.53 -4.~7 0.67 3.72 S 3.59 -4.13 1.06 3.67 S 3.72 -3.68 1.43 _'4.24 S 3.48 0.52 4.91 0.84 N 2.30 12.27 3.52 12.23 N 29.75 2.93 29.28 N 52.80 4.13 51.83 N 81.45 2.48 79.68 N 115.58 2.41 112.86 N 155.02 2.88 151.33 N 200.60 3.01 195.85 N 253.19 2.77 247.01 N 312.46 0.21 304.73 N 372.76 0.52 363.47 N AZIMUTH FEET DEG MIN 0.00 N 0 0 E 0.09 N 12 24 E O. Zl N 25 5 W 0.39 N 79 31 W 0.69 S 69 37 W 1. O1 S 54 7 W 1.IB S 61 27 W 1.47 S 5~ 17 W 1.59 S 63 8 W 1.88 S 59 54 W 1.91 S 66 17 W 2.13 S 63 40 W 2.11 $ 67 12 W 2.05 S 63 11 W 2.10 S 63 42 W 1.76 S 59 1 W 1.50 S 43 4 W 1.38 S 13 56 W 1.69 $ 15 55 5 2.33 S 34 52 E 3.08 S 45 52 E 3.66 S 46 54 E 4.19 S 46 28 E 4.55 S 45 49 E 4.82 S 45 32 E 5.03 S 44 34 E 5.17 S 43 57 E 5.23 S 45 26 E 4.7b S 47 5 E 2.45 N 70 4 E 1.13 W 12.28 N 5 16 W 5.48 W 29.79 N 10 36 W 10.74 W 52.93 N 11 42 W 18.61 W 81.82 N 13 9 W 27.84 W 116.24 N 13 51 W 37.66 W 155.95 N 13 59 W 48.63 W 201.79 N 13 57 W 62.71 W 254.85 N 14 15 W 78.18 W 314.60 N 14 23 W :93.77 W 375.37 N 14 28 W 0.00 0.00 0.00 N 0.00 E 0.08 0.00 0.09 N 0.02 E 0.20 0.32 0.19 N 0.09 W 0.12 0.00 0.07 N 0.38 W -0.15 0.00 0.24 S 0.65 W -0.48 0.32 0.59 S 0.82 W -0.42 0.55 0.56 S 1.03 W -0.64 0.61 0.81 S 1.22 W -0.52 0.92 0.72 S 1.42 W -0.72 0.67 0.94 S 1.63 W COMPUTATIgN DATE: 20-SEP-89 PAGE BP EXPLORATION W-32 C32-16-11-123 PRUDHOE BAY NORTH SLOPE, ALASKA DATE ~F SURVEY: 14-SEP-89 KELLY BU,SHING ELEVATION: 90.86 FT ENGINEER: WEBER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MtN 4086.68 3990.86 3900.00 30 41 4203.05 4090.86 4000.00 3:0 53 4319.45 4190.$6 4100.00 30 40 4435.63 4290.86 4200.00 30 29 4551.51 4390.86 4300.00 30 14 4667.32 4490.86 4400.00 30 32 4783.95 4590.86 4500.00 31 20 4901.67 4690.86 4600.00 32 21 5020.13 4790.86 4700.00 32 25 5138.11 4890.86 4800.00 31 50 5255.30 4990.86 4900.00 31 9 5371.95 5090.86 5000.00 30 44 5488.03 5190.86 5100.00 30 15 5603.32 5290.86 5200.00 29 32 5717.74 5390.86 5300.00 28 44 5831.62 5490.86 5400.00 28 27 5945.26 5590.86 5500.00 28 17 6058.51 5690.86 5600.00 27 48 6171.48 5790.86 5700.00 27 35 6284.08 5890.86 5800.00 27 10 6396.53 5990.86 5900.00 27 19 6509.13 6090.86 6000.00 27 22 6621.70 6190.86 6100.00 27 18 6734.15 6290.86 6200.00 27 10 6846.78 6390.86 6300.00 27 43 6960.17 6490.86 6400.00 28 2,6 7074.03 6590.86 6500.00 28 44 7188.38 6690.86 6600. O0 29 17 7303.12 6790.86 6700.00 29 32 7418.62 6890.86 6800.00 30 33 7535.55 6990.86 6900.00 31 56 7654.25 7090.86 7000.00 33 8 7773.58 7190.86 7100.00 32 51 7892.54 7290.86 7200.00 32 36 8011.28 7390.85 7300.00 32 42 8130o64 7490.86 7400.00 33 32 8250.74 7590.86 7500.00 33 33 8370.41 7690.86 7600.00 33 11 8489.91 7790.86 7700.00 33 16 8609.90 7890.8,6 7800.00 33 53 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IOO FEET FEET FEET DEG MIN N 14 6 W 432.08 N 13 48 W 491.24 N 13 42 W 550.48 N 13 30 W 609.32 N 13 33 W 667.55 N 13 11 W 725.68 N 12 33 W 785.46 N 12 8 W ~47.37 N 12 .3 W 910.70 N 12 9 W 973.11 N 12 16 W 1034.03 N 12 16 W 1093.90 N 12 2 W 1152.66 N tl 40 W 1209.88 N 11 20 W 1265.37 N 11 25 W 1319.74 N 11 56 W 1373.59 N 12 1,8 W 1426.60 N 12 38 W 1478.97 N 12 44 W 1530.53 N 12 1,~ W 1581.78 N 11 11 W 1,533.40 N 9 57 W 1685.04 N 8 16 W 1736.4~ N 6 28 W 1788.27 N 5 ,5 W 1841.69 N 3 20 W 1896.02 N 1 34 W 1'951.25 N 0 16 E 2007.07 N 1 50 W 2064.36 N 7 24 W 2124.85 N 12 24 W 2188.70 N 12 16 W 2253.59 N 11 2 W 2317.87 N 9 53 W 2381.83 N 9 17 W 2445.96 N 8 44 W 2513.45 N 8 21 W 2579.17 N 7 ~1 W 2644.60 N 5 37 W 2710.88 0.65 0.33 0.40 0.24 0.28 0.95 0.61 0.51 0.70 0.63 421.33 N 108.51 W 435.08 N 14 27 W 479.10 N 122.83 W 494.59 N 14 23 W 536.95 N 136.98 W 554.1.5 N 14 19 W 594.45 N 150.89 W 613.30 N 1/+ 15 W 651.36 N 164.57 W 671.83 N 14 11 W 708.19 N 178.10 W 730.24 N 14 7 W 766.70 N 191.45 W 790.24 N 1/+ 1 W 827.38 N 204.72 W 852.33 N 13 54 W 889.49 N 217.99 W 915.81 N 13 46 W 950.70 N 231.10 W 978.39 N 13 40 W 0.13 0.45 0.67 0.53 0.39 0.3.4 0.76 0.23 0.37 0.4.6 1010.43 N 244.01 W 1039.47 N 13 35 W 1069.12 N 256.76 W 1099.52 N 13 30 W 1126.73 N 269.19 W 1158.44 N 13 26 W 1182.88 N 280.96 W 1215.79 N 13 22 W 1237.37 N 292.04 W 1271.37 N 13 17 W 1290.80 N 302.71 W 1325.82 N 13 12 W 1343.66 N 313.62 W 1379.78 N 13 8 W 1395.65 N 324.75 W 1432.93 N 13 6 W 1446.97 N 336.08 W 1485.48 N 13 5 W 1497.46 N 3~,7.45 W 1537.24 N 13 4 W 0.52 0.45 0.52 0.77 0.92 0.76 0.83 0.94 0.83 2.53 1547.66 N 358.66 W 1588.67 N 13 3 W 1598.33 N 369.18 W 1640.41 N 13 0 W 1649.14 N 378.65 W 1692.06 N IZ 56 W 1699.91 N 386.81 W 1743.36 N 12 49 W 1751.33 N 393.41 W 1794.97 N 1Z 40 W 1804.49 N 398.83 W 1848.04 N 1Z 28 W 1858.78 N 402.81 W 1901.93 N 12 14 W 1914.20 N 405.16 W 1956.61 N 11 57 W 1970.45 N 405.72 W 2011.79 N 11 38 W 2028.23 N 405.96 W 20.58.46 N 11 I9 W 3.02 1.20 0.54 0.94 0.38 0.60 0.48 0.40 0.79 0.43 2088.61 N 410.87 W 2128.64 N 11 8 W 2151.50 N 422.24 W 2192.54 N 11 6 W 2215.07 N 436.40 W 2257.65 N 11 9 W 2278.17 N 449.42 W 2322.08 N 11 10 W 2341.15 N 460.93 W 2386.10 N 11 8 W 2405.41 N 471.77 W 2451.24 N 11 6 W 2471.09 N 482.20 W 2517.70 N 11 2 W 2536.10 N 491.96 W 2583.37 N lO 59 W 2600.93 N 500.81 W 2648.70 N 10 54 W 2666.83 N 508.05 W 2714.79 N 10 47 W COMPUTATION DATE: 20-SEP-89 PAGE 7 BP EXPLORATION W-32 (32-16-11-12) PRUDHOE BAY NORTH SLOPE~ ALASKA DATE OF SURVEY: 14-SEP-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINEER: WEBER INTERPOLATED VALUES FDR EVEN 100 FEET DF SUB-SEA DEPTH TRUE SUB-SE~ COURSE MEASURED VERTICAL VERTICAL DEVIATION aZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZo DEPARTURE SECTION SEVERITY NORTH/SDUTH EAS'T/WEST DIST. AZIMUTH FEET DES/lO0 FEET FEET FEET DEB MIN 8730.61. 7990.86 7900.00 34 4 8851.40 8090.86 8000.00 34 12 8971.93 8190.86 8100.00 33 26 9091.18 8290.86 8200.00 33 1 9210.79 8390.85 8300.00 33 34 9331.28 8490.86 8400.00 34 8 9452.05 8590.86 8500.00 34 6 9572.58 8690.86 8600.00 33 46 9692.86 8790.86 8700.00 33 48 9812.72 8890.86 8800.00 33 19 N 5 6 w 2778.46 N 6 1,~ W 2846.18 N 4 18 W 291.3.40 N 2 30 W 2978.18 N 1 0 W 3043.44 N 0 59 E 3110.06 N 3 40 E 3176.73 N 6 53 E 3242.28 N 9 5.8 E 3306.46 N lO 23 E 3369.26 0.2 3 1.71 0.87 1.03 1.63 1.65 1 1 0.82 2734.09 N 514.93 W 2782.16 N lO 40 W 2801.45 N 522.21 W 2849.71 N 10 34 W 2868.43 N 528.51 W 2916.71 N 10 26 W 2933.29 N 532.26 W 2981.19 N 10 17 W 2998.88 N 534.25 W 3046.09 N 10 6 W 3066.08 N 534.37 W 3112.30 N 9 53 W 3133.73 N 531.63 W 3178.51 N 9 38 W 3200.72 N 525.44 W 3243.57 N 9 19 W 3266.82 N 515.60 W 3307.26 N 8 58 W 3331.81 N 503.65 W 3369.67 N 8 36 W 9932.96 8990.86 8900.00 34 14 10054.43 9090.86 9000.00 134 58 10176.92 9190.86 9100.00 35 29 10240.00 9242.22 9151.36 35 19 N 8 56 E 3433.00 N 7 57 E 3499.22 N 6 51 E 3567.57 N 6 51 E 3503.01 0.86 0.95 0.00 0.00 3397.64 N 492.50 W 3433.15 N 8 15 W 3465.84 N 482.37 W 3499.24 N 7 55 W 3536.02 N 473.41 W 3567.57 N 7 38 W 3572.38 N 469.04 W 3603.04 N 7 29 W SCHLUMBEROER D 1' AEC T ~[ ONAL SUR V E Y COMPANY BP EXPLORAT]~ON NELL N-32 (32-16-11-12) FIELO PRUOHOE BAY COUNTRY USA RUN ONE OATE LOOOED 14 - SEP - 89 REFERENCE ?3480 IS~3 000~' /S3M O00E 0002, 000 [ 0 000 [ - 0002,- 000[ - 0001~- .... i...J .......... 1 .................... J...;....~....~..J...J...~....i ....... ;....J ......... S..[..S..~...i....i ....... .L..~....~....i..J...S..i....S..j ........ S..i....i....i...L..S..S..S..i ........ S..i....S..i..J....i....;~_.S..~ ....... i...S..i...S..[...i...;....i...; ........ i...i...i...i...L.S..S..i...~... 0002,- HJ, ROS .... ;.-.?-.~...:..-k.~...?~...~ ....... ~....;-.k.~...~...~...:~...;...: ....... ~--.~-..~.--~,-.-k.;--.~...~..-~ ...... i....i-..~...;...k.~...~...~...;...i...~..+..;...;...~...;...~...:....; ....... ~....i~4-.i.-..~...;4...:L-~ ....... ~...~.-;-.k.~.-..i-.~.44 ...... · .i....~ ........ ~..i ..i ........ i ....... ,...; ....... ;...i ..~...i....i...~ ..... ~...;-..i....?...i....i....~...~....i ....... ~-..-~....i-..-i.--.i-.--!....~...i...-~ ........ i....!.--i-...i.---i-...i----h-i....! ........ i.---i.--i-...~---+-.F-h.F.~ ....... F.~--!-.~-+-i--h-F-i ........ F-~=~--~--h-!-F-~-.i ........ ?'"T"r"T"t"'~'"t'": ............ F'F?'"F'~'"F"T"7 ....... ~"'7"T"i'"'T"r'F"T"~ ....... i'"'i-'?'"S-t'".?"?'i'"'i ........ '~'"?-~'"'?"T'"T"~'"~"? ....... F"~'-~'"'.T'I'"'.?~S"T"~ ....... .~'"~-?i'.,-T?i'...'-?T ...... ?-.t-°..t-FT-i'-'~-T-t-' · "+'";'";'--;-'-~"-;'"~'"!'"f ...... ~---'f-";'"~---F'~'''~-'-~''-; ...... F.;---~--.~-.-.h-F.~-...~---~ ...... F-!-f..-~---f--+..f--.h-+ ....... +--+-h+'-h+-'f'--f'-~ ....... ~--+'-'f-"f'--h-f---h-+-"~ ...... f'-+"+-+-+-+-+-~-+ ...... .i....~...;...~. i...S .; ..i ..~ ;...;...,....~..i .: ..:... i...: ; ..:..L..~....i..J...~....i....i ....... i....i..-~....i...-i....~....i....i...; ........ !.-..i.--.i...-!.....,'-.-4--.-!-..-i..-.i ....... i-.-.i----i----~.---,,'.--!---.!----i---.!- ....... !--.i--i--i--~-.!--i ........ ~ ........ !--i--i.-.!-4.-~--~--i--i ...~....i....i ..~...i ...i....i...:.....i ..... i...i ..i...i...J....:. J...i .~ .... ~_. ~ ..~....i....i....i...i....i....~ ........ i....L..,.L..~....~..J....L..i....i ....... i...~....L..~...~....~...J....~....~ ........ ~....~...J....L..~...~...i...L..~, ....... :Li_l_j__~_j__i_.l_j__:-.L..~-J--J--l-J-d-.L_i · 'i"i=.'"i...'i ..!. !...~..,i ....... ;'.!..-.: "!' i"i'-'i-.¥.~ .... !....:-.-i..i...-!...i."-!'"-;--.-i ........ !-.-!-!--"!-'"P~'-~--~--~ .... n-'i-"-i'---!'--~h-F'~'---i----F'i ........ !-...i---.i..--!.-.-F.h-F.!--..! ........ i-.-i--i--i--F-i--i--,~--i-:--!---i~--i-?h.i---F.i--i ..; ..i ..i...!..i ..;...;...i...i ; ..i ..: ....... ~.. i...:...: .: ...... .'._.:... :....L..i....i....~...~...~ ........ L..i....~....i....i....i....i....i....! ...... ~.~..:....i....L..i....L..!....i....L..~ ....... L..L..i....L.i_..L..L..!....i ........ L_i__i_.S_L.S_i._S_i ........ · ..F!....; ..!....i. ~...?! ...... !...i.-.~.-.H..-; ............... i.-.-~--~----H .-i.71..-.; ........ ~.---:---i-.--H...i....{....i-.-~'j~:--U---H.--.~..---i--..; ....... H---'H-'?-i----FFi ....... i---F~---H----i-'--i---'i'---i ....... !----i----i-..H----H---i-.-! · ..r.::....~ ...... f...~ ........ i....r.~..t..,....?.:....f..?.-.i...: ....... ';'"'r':'"t"'f'-r"i ........ ~ ........ f'"~-"?"!'"'f'"?'"i"OOCS¥~"?"!'"'f"'r'i""f"! ........ i""i""!'"'F't'"F'f'"i'"'f ....... ?ff-T-i--f'-i--i'-%i ....... hi--i-fi--h?f-i-fi · .;., ...... . ....... f .; ..: .?..r.~ t--, ...... :-'--'. ....... ! ..... ! ....... ~- '?---:-'"~ ........ f--'t'--t---f ....... M[-i" ~"-'?"t'--i'---f---i---'~ ........ i--'t-"'; ........ ~ ........ t--t'--~ ........ i-'"t--%-?'!'-"i-"'i-'-t---,.:-'--~ "'~ ........ i'---i--' ~----J ....... ?'! .... ...... ! ~ ;:.,; .i :.; ..... ~ ..... ~.; ; .,...i...; .... ~..; ;..; ........ ~;..~ .... ~..~...:...~...~...i ....... i .J...~ .;-..-i-..i_.;-.i .......... ;...i--..:..-~...~...~--..~..;...; ...... ~-..i---~ .-~--~---~.---~---~.-.;.- ......... :'": ....... ~'": ........ :": ........ ~"": ........ ""'.r"¥"?'"?'""'-t": ............ ?"?'i"-! ....... :""?";"'?'"!'"'?"! .......... ~'~;;~'"I'"'i'"'; ........ ~'";'"i'"T"!'"'1'"'..'*'";'"'!'"'i""i ....... ~-T'T-!'-?-FT?'i ........ ?-i- ....... ;????'? · ..!.,,.!...:..~-..i.-:-:..,,.;..-i ....... ;--..~.:,:i:,.i..i-.--!.,..;.:::;,:::::::.-..:-..: i---:;::.i::.-!....!.-..! ....... L:-..i....!....i....!...;.-.!--..!.-~,oo~-4,...f...!..:.i....!.-..i....i ....... ;....!...~!....!....~....!....i....!.~..!.....~"t.!.".;".!"..i.".i"~!~..i"..!~~::i::i:,.!~?.i:~!:~i::!::i : ': '. ' i ' . ' ' '. '. ' i '. I ! ' . : i : i '. '.. ~ I i i :.. :~!i: iL i ; ! ; i i ! : :: i : i ! ! : i ; : i : i : ~ i I ! ': i : ! ~:-I .. i- i-.-.i ..... ~ .... ,, .. ~ ,. i ~ ].., .... , ..... ~-.~ .~ .-i... i -~. i..-.: ~ ~. ~...i-..-~ ~-.-;-.-i--.-i-..~ ...... :....i..-~...i ..... ~.--~--.~-.-~.---~---i--.-~--..~----~--.i...~--~-.-~.-..~ ...... ~--.~---~--~--.-~-...~----~--.-i----~ ...... ~---~-.--~.-~...-L-.L.-~--~-.i . i....LJ. :. 4..~. ~. ~ .J .... ~...~....; .i....L..~....~....~. ~ ...... L..i....i...i....i....i_.!....~....~ ........ ~....L -~..--i--.-.;-.-!...~...i....~.... O0 .~8..!-~!....~...-!--..!.--.!.... F-.i...i....~....~-..~-..L-.~-...~....~ ........ ~...~...SJ-4-J--~--;.-~ ....... ~__L..~_i--i__!._J__!._J ..~ ...... ' · .~.~ .?. i....;,,i ' ~- ! i ;...i.~.-..~...i...~.4-.-! -i ...... ;-.!-.i-..i-..Li..J...~..-; ........ i---.i.-.-i----!-.i !..!....i....i ...... !..4...i..-i.-..!.-.?.,..i,...i .... i--i.---i-.!.-..i..-.i---Li---.: ........ i----;----i-4j i.-.!--!--i-- i: ~ .i .,i ....... ;.,.i ....... i..:J....!.. L.j...:Li.:.i.:.:L...:.J....J...L.i..::i...i:.. i ~ 12 :.S..J_::i:::i..:~:.:J::::i...J..::i .. ~:~....~:...~.::Li..:j.:..~:~:i::..j..::.~..i:.~i.:::i~.~:i:::i...i.:~i.:.:i...:i ' :' 'i"'?'i' i'i "?'-? i ....... ii? [.,: .:..:...:...: ....... :..:...:..J...!:.SS!..:J:::::._::::' i !-..-!.-, i..!..i...i i,,,~.-..i ....... i. i 'i""!'"i'"i ...... !'"' ~"'{i"?""!""{ ........ ~....i~i.~.i~..L~...i~.~i:.~i~..I:::~::::}::::~:::i::.!7:i:::i::::~::.:i::::::::::::::::::::::::::::::::::::::::::::::::: .: :i:..: .:: :..::. :' .::::::.::i: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: / ....... ; ' ..... ~ .... ~ ....... 1 ...... : .... , i ....... : .... ~. ..... i'"'!" '~': ...... 1 ....... ?"! :"i"';": ...... '.-'i ':':": ....... i--~ ........ "'"'"',"' ': ........ ="i-'7"? ~'"'~ .... [ ...... ~ ...... ~': .... 7 ] '77 ...... :' 'I'"'7 :"7 ..... ~ ":'": ...... =",*"":"":'":"'T"T"T"T"T"T"'T"t'"T"t'": ....... T-..T.-~T..-T...T,..T..T--T..T-T,~T..T-.T..;.--?~T-..T-.7~.T.~T~%...~.-.T~.T~i-..T.-.T..~T.%...1...-T..T~T-~.T..T-.T.--??~.~- l~/NI O00l/[ = 39U3S OB~E£ 000[- 0 000[ 0OO2, O00E 000~ O00S 0009 Hi~ON (3Z[~ 'NLLl '[Z 33S '93M ,Z~L '9NS ,ZEZ) NOIlO3~O~d 9VINOZI~OH f -[[-9L-Z~) Z£-M '993M WELL ' (732' W-32 '(32-1 6-1 l- ~ SNL, 1442' WEL, SEC 21, TllN, R12E) VERTICAL PROJECTION 172. -2000 -!000 0 0 1000 2000 3000 4000 5000 GO00 352. PROJECTION ON VERTICAL PLANE 3S~. - 17Z. SCALED IN VERTICAL OEPTHS HORIZ SCALE : 1/1000 IN/FT BP EXPLORATION BP Exploration {Alaska) Inc. 900 East Benson Boulevarcl P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON MOBIL PHILLIPS _~oF ~LASK~ GEOSCIENCES ARCHIVES DATE: 09/27/89 TS: 80409 BP OPEN HOLE FINAL LOGS Enclosed.is your copy of the material listed beloW. If you have any questions, please contact BP Well Records at (907) 564-4445. HOU/UNIT/STATE: F-21 Mudlog 07/16-17/89 S- 11065-11880 NL Baroid W-26 Mudlog 08/17/89 S- 11380-12030 NL Baroid W-32 Mudlog 09/09-10/89 S- 9658-10240 NL Baroid Z-09 Mudlog 08/28-30/89 ~- 10391-11224 2~ 2" 2" 2" STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Survey Date: Information Control Well Records LR 2-1 J. Dietz/S. McCurry Job#: JobS: L/:~iaska 011 &eas Cons. Commlsslo.[.~ Anchorage BP E~PLORAT]ON BP ExDIorat,on (Alaska) Inc. 900 East Benson Boulevarcl P.O. Box 196612 Anct~orage. Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 09/26/89 Transmittal: 80404 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-05 Prod-F 09/16/89 81 10700-11119 Sch C-30 Collar 09/23/89 91 9240-9643 Atlas 5" F-09 Perf 09/16/89 81 9700-10182 Sch F-22 Collar 09/22/89 81 9510-9834 Atlas R-09 Prod-F 09/17/89 ~1 9000-9599 Sch 5" W-32 Perf 09/16/89 91 9913-9955 Sch Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR ARCHIVES BP ~(PLORAT]ON BP Exoneration (Alaskal Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, AlasKa 99519-6612 (907) 561-511~ To: Distribution Date: 09/21/89 Transmittal: 80382 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS _ - . · · . . Enclosed is your copy of the material listed below. If yo~ have any questions, please contact BP Well Re6ords at (907) 564-4445. C-14 C-15 C-16 F-32 GC-iE R-01 W-32 W-32 W-32 Leak Det 09/14/89 Noise/Temp 09/13/89 Leak Der 09/14/89 TDT-P 09/12/89 Tubing Cutter 09/14/89 Plug Setting Rec 09/15/89 CCL/GR 09/14/89 CBT 09/14/89 CET 09/14/89 9900-11700 Sch 5" 8050-8400 Sch 1"/5" 7800-8300 Sch 5' 10050-10801 Sch 5' 2200-2570 Sch 5" 8990-9400 Sch 8800-9272 Sch 9375-10185 Sch 5' 9375-10185 Sch 5' Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR ARCHIVES Alaska Oil & Gas Cons. CommissiQD Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To ARCO EXXON PHILLIPS STATE OF ALASKA Date: 09/19/89 T#: 80371 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-32 OH/DIFL/BHC/CNL/PORO 09/11/89 #- 7236-10264 TP#.06707 Atlas~3965 1600bpi API#50-029-21970 with CH/CNA Information Control Well Records AR2-1 J. Dietz/S. McCurry Augus'n 17, 1989 Telecopy~ (907)276-7542 J. G. Vidrine Drilling Engineerin§ Supervisor BP Exploration (Alask~a) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Prudhoe Bay Unit W-32 BP Exploration (Alas~) Inc. Permit No. 89-91 Sur. Loc. 732'SNL, 1442'WEL, Sec. 21, TllN, R12E, UM. Btmhole Loc. 2471'SN~, 1869'WEL, Sec. 16, TllN, R12E, IFM. Dear Mr. Vidrine: Enclosed is the approved application for permit to drill the above reference~ welt. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior =o commencing installa=ion of the blowout prevention equipmeng so ghat a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to co~mencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. V~e~-M truly ~yOurs, C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Co~ission BY ORDER OF ~E CO~iISSION dif Enclosure Depart~nt of Fish & Game, Habitat Section w/o encl. Departmen~ of Environmental Conservation w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 14, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well W-32 (32-16-11-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to drill the above-named well. Also included are the attachments noted on the permit form and our check in the amount of $100.00 to cover the permit filing fee. Yours v. ery ,truly, /CL. G. Vidrine ~rilling Engineering Supervisor JGV/KTH CC: Richard Smith Well File STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-Illb. Type of well. Exploratoryl-! Stratigraphic Testl-i Development Oill~l Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) I10. Field and Pool BP Exolora#on KBE = 92 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28263 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(se,, 2o AAc 732' SNL, 1442' WEL, SEC. 21, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2601' SNL, 1853' WEL, SEC. 16, T11N, R12E W-32 (32-16-11-12) 2S100302630-277 At total depth 9. Approximate spud date Amount 2471'SNL, 1869' WEL, SEC. 16, T11N, R12E August24, 1989 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(uDandTVD) property line ADL 28262/3410 feet W-31 @ 35 feet 2560 10,189'MD/9204' TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickoff depth 2800 feet Maximum hole ancjle 320 Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 pst~ 18. Casing program Specifications Setting Depth size Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. 80' Surface 110' 110' 17-1/2" 1.3-3/8" 68# L-80 Butt 2650' Surface 2680' 2680' 3840 cuft Cold Set II and III 12-1/4" 9-5/8" 47# L-80 NSCC 9653' Surface 9683' 8775' 2024 cu ft Class G 8-1/2" 5-1/2" 17# L-80 NSCC 755' 9434' 8562' 10189' 9204' 324 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor [?~-.~. ~' ~'''' "~. Surface ~-'~,,. L~ ~ ~ ~ ~? Intermediate Production ~i:~,!?~ ~ i: Liner Perforation depth: measured ~,.,!~.SJ~:~.~ 0ii & Gas C0ns~ true vertical Anchorag~ 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby/~e~that~t/h/e,,, ..,-, --., --f°reg°ing is true and correct ,o the best of my knowledge ~;y/~,oc) Signed ~_~ '~J'/Z_.~k~ Title Drilling Engineering Supervisor Date Commission Use Only Permit Nu~r_ ]APl number IApproval date JSee cover letter ~x/ 15°'O'2"?''' ~-'/~,~'~ I 08/J. 7/89 Ifor other requirements Conditions of approval Samples recl_uir~ed [] Yes ~ Mud log requ~ed [] Yes..,'~No Hydrogen sulfide measures [] Yes_~l No Directional survey requ~re~ ,~Yes [] No Required workingj~'e)ssure~r,BO'P-~ ,I;~U;/[]3~; ~5M; I-'I10M; []15'M; Other: (~,~,.~ C~~,~~~.~ by order of Approved by .. Commissioner [ne commission Date Form 10-401 R{ 1-85 Submit PROPOSED DRILLING AND COMPLETION PROGRAM WELL W-32 [32-16-11-121 PBU Install and cement 80' of 20" conductor to surface. The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 17- 1/2" hole, a 9.0 - 9.9 ppg water base mud in the 12-1/4" hole and a 9.9 ppg water base mud in the 8-1/2" hole. Drill 17-1/2" hole to 2700' MD and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point 10' below the Sag River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and cement using Class G cement around the 9-5/8" shoe. Directionally drill 8-1/2" hole to TD. Run 5 1/2" liner from TD to 250' inside 9- 5/8" casing shoe and cement using Class G cement. Clean out to 5 1/2" float equipment. Change over to 8.9 ppg. filtered NaCL completion fluid. Test casing and lap to 3000 psi. Run CET/CBT/CCL-GR and GYRO. Perforate with Schlumberger. Run 9-5/8" production packer on 3.5" tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. The fluids incidental to the drilling of the well will be pumped down the 9-5/8" x 13-3/8" annulus of the well. Tubing Size: 3-1/2", 9.2# L-80 TDS TBG with GLM's. Tailpipe Size: 3-1/2" Tailpipe NOTE: Perforate with rig on location RIS: 8-8-89 PROPOSED DOWNHOLE DIAGRAM WELL W-32 [32-16-11-12] PBU/EWE 20" Conductor Ball Valve PROPOSED DEPTH BKB 110' 2100' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 2700' 3-1/2" 9.2# L-80 TDS robing with GLM's 9-5/8" Packer 9384' 5 1/2" Liner 9434' 9-5/8" Shoe 12-1/4" Open Hole 9684' 9694' 5 1/2" 17# L-80 NSCC Liner 5 1/2" PBTD 5 1/2" Liner Shoe 8-1/2" Open Hole 10149' 10189' 10189' RIS Aug. 8th, 1989 B.O.P. STACK CONFIGURATION I.'5-5/8 IN. TRIPLE RAM STACK 5000 PSI WP DRILLING ANNULAR PREVENTER I, 1 PIPE RAMS 1 BLIND RAHS I 2 IN. KILL LINE GATE GATE DRILLING SPOOL 4 IN. CHOKE LINE I GATE GATE I I PIPE RAMS , I I NORTH WELL Ne W':5~ SURFACE LOCATION LAT. · 70° I?' 54. 088" LONG. · 149° 05' 40. 846" ¥ · 5 , 959 ~ 517. 88 A.S.P. X · 6 II , 789.05 ZONE 4 ?$5 ' 1442' FROM N. LINE SECT. FROM E. LINE SECT. 21 CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I All PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND tURVEYIN6 ~1 THE STATE OF ALASKA AND THAT THIS I~.AT REPRESENTS A LOCATION IURYEY MADE BY ME OR UNDER fly lUP~RYi}IOH, K THAT ALL DIMENSIONS AND OTHER DETA,LS &RE CORRECT. SURVEYOR DATE: I~ ~ ~CALE: L I (MILES SHEET I OF 2 ,WELL PAD'W' ! · 'II~ELL N° W- 32 AS- IUILT LOCATED IN PROTRACTED SECT. ~1 ~ T. II N. ~ R. 12 Ir. , U.M. SURVEYED FOR : ~ ALASKA P~ODU{T~ON gC , PREPARED. SY : DATE ~ NOV, 15, 86 KUUKPIK - TECHNICAL SERV. INC. m~AW. SY: B.T. PRUDHOE BAY OFFICE CHKD. BY; R.H. II 16 I§ 21 22. ~.. OF wELL PAO WELL PAD "W" SCALE 1":400' REV. ~ /02/88 REV. 5/18/88 JJC 17./08/87 JJC LEGEND · EXISTING CONDUCTOR BOX e FUTURE CONDUCTOR BOX i n (AS STAKED) PAD "W" Loc ated in PROTRACTED SECTION 21, T. I I N.~ R.12E.~ UMIAT MERIOIAN~AK. Surveyed for STANDARD ALASKA PRODUCTION CO. Surveyed by KUUKPIK TECHNICAL SERVlCES~ INC, ANCHORAGE, ALASKA (907)561-5257 $45DU~124: [ DRANO2_5_]_W_32_C_LPSAP._S.H_O_R_T.__.L.!S; 3 , 1_0. -AU_~- 1_~_8g 1_4d_14 --- Closest Approach Analgsis --- P~ Date: IO-AU~-8? Time: 14: 14:22 ~' .. S.e_a ~ _c_~_R_a d_i .us_--_~_O0 C_O_UB.~E_LI h_lF ~' For p~oposed well: W-3~ [3~-16-11-1~] '~ ,, , Lo_c.a~,,. =, W_-E S_-[4 TV.Q_tLSBS). '" Top 61178~. O0 5~5~518. O0 -~2. O0 ~ Botto~ 611300. ~ 5~63055. 55 ~11~. 22 ,~: Note: All depths in ~eet Below Kellg Bushing (BKB) WELL IDENT AO~-~O~-=400 MP1511 Closest Approach /PROPOSED\ /NEARBY\ CLOSEST TVD DEPART TVD D~PA~T Vertical Intersection /PROPOSED\ /NEARBY\ ....... T~D DEE~ TVD ....... DE~.AR~ VERTICAL =T A02~-2183400 · . ., _/i0~c~-I__~6720 AO~-~IS7~O0 A02~--2188700 W-30 I7~.5 0.0 17~.~ 1~.2 101.6 '!33 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 201.5 0.0 200.0 0.4 6~.8 W-27 I. 2 O. 0 O. 0 O. 0 175. 0 A029-~190000 ___.N.-_31 .1~I O~O. _(LO O._O 2_5~0 The_~_e_l_l__~hich co.m.e~s cl_o_s_e_st to th.e_p_r_qp_o_s_e_d__uLeli is: A02~/-21 ~0000 W-31 Closest approach distance = 35.0 ~eet KICK OFF ¢o~ this run = 2800.0 Ceet --- Closest Approach Analgsis --- Date: lO-AUg-8c~ ~' .____S e~r_c~_R a_diu, s =__20_0 7 DEQ.~EE_LE~I~E For proposed ~ell' W-32 [32-16-11-12] 'F~: Top 61178~. O0 5~5~518. O0 -~2. O0 .? "~ Bottom 610873. 51 ~62~6~. 71 ~112. 22 Time' 14: 15:08 Note- All depths in ~eet Belom Rellg Bushing (BKB) WELL IDENT /PROPOSED\ Closest Approach /NEARBY\ CLOSEST .... DEPART T_~.~ , ,DEE~_T D.I.~N_~E, Vertical Intersection /PROPOSED\ /NEARgY\ T_V_D DEP_~R] ...... ~D DER.~R.T VERTICAL A02~-2052400 MP~511 AO2V--2183400 W-2V TVD N O__C_D_D R... DJ__N ~_T_E_ __P O.I. N_ T_S__WJ_T___H I _N_S P_E.C_ !. E_I E D__S E A~ R._C H__W ~ DO W 17~. D O. 0 17~. ~ l~. ~ ~01.6 '_A_O 2~T_=- 2 L 8_6 7__ _0_0 W-34 A02~-2187400 A02~--2188700 W-30 AO2~-21.8~_4gg. NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW i_6_0.~3. 0.0 !~g~,~ 3 I 2~.7 201.5 0.0 200.0 0.4 69.8 W--'~7 1.2 O. 0 O. 0 O. 0 175. 0 A02C2--2190000 W--31__ L_l .0.~0 __.O~O __O~_O_ 3_5~0 The ~,ell mhich comes closest .t._o__t__h.e__py_Op.o_s_e_d__mell i_s3 A02c~-21 c~O000 W-31 Closest approach distance = 35.0 Feet ~ICR OFF For this run = 2800.0 ~eet ALASKA UNITED RIG NO. 3 MUD SOLIDS CONTROL EQUIPMENT 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1 - Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desiiter) · · 1- Tri-Flo Horizontal Vacuum Atmospheric Mud Degasser 1- 200 gpm Operating Capacity Centrifuge I 9- Brandt MA5 Mud Mix Agitators 1- 125 bbl. Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1- Drilling fluid flow sensor with readout at driller's console 1- Cavium Dewatering screen assembly RIG 3 MUD SYSTEM HOPIIEIf ALASKA UNITED DRILLING INC. RIG 3 MUD SYSTEM i DIIWN. BY Ocfober 1987 NT$ I AIq~OV~D CH~.CKED I FIL~ NO MUD WEIGHT CALCULATIONS WELL W-32 (32-16-11-12) Mud Wt. (8-1/2" Hole): 9.9 ppg. P Sag River: P Sadlerochit: P Top Sadlerochit: 4350 psi. 3960 psi. at 8800' TVDSS 3966 psi. OB Sag River: OB Top S adlerochit: Current GOC: 167 psi. 620 psi. 8902' TVD BKB 9-5/8" Casing Pt. Top Sag River Top Sadlerochit 8775' TVD BKB 8775' TVD BKB 8910' TVD BKB Cement Calculations 13-3/8" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 2680' 2.06 x Annular volume 3840 cuft 1920 cult 1000 Sx Cold Set III @ 1.92 cuft/Sk 1920 cuft 2000 Sx Cold Set II @ 0.96 cuft/Sk 9-5/8"CASING Measured Depth: 9684' Basis: 90% Annular Volume to 13-3/8" + 50 cuft Total Cement Vol: 2024 cuft Lead Slurry Vol: 1439 cu ft 791 Sx G+8% @ 1.82 cuft/Sk Tail Slurry Vol: 585 cuft 500 Sx Neat G @ 1.169 cuft/Sk 1/2" LINER Measured Depth: Basis: Total Cement Vol: 9434' Hanger- 10189' Shoe 1.5 X Annular volume to 9-5/8" shoe + 150 cuft 324 cult 213 Sx G+35% Si Flour at 1.522 cuft/Sk RIS: 8-8-89 CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE me 3. 4. 5. 6 7 8. (8) ( 3 ) adm i n A~/~z-, ~//~'~ 9. (9 thru 1'3')-' · 10. (10 and 13) 12. 13 (14 thru 22) (23 thru 28) Company ~ ~ YES Is the permit fee attached .......................................... Is well to be located in a defined pool ............................. Is we~] located proper distance from property line .................. Is We~[ ~located proper distance from other wells ........ . ........ .... Is sui~iaient undedicated acrea§e available in this poo1 ............ Is well to be deviated and is wellbore plat included ................ Is operator the only affected party ................................. Can permit be approved before fifteen-day wait ................ ~ ..... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate .................................. Does the well have a unique name and number .' ' Lease & Well No. /~ ~~--C~ ,' ~J",~'~ NO 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is conductor string provided ........ ~ ............................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~cp psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. Z / (6) OTHER. ~ ~//~"/~ (29 thru 3~) (6) Add: Geology: DWJ ~ En~ineerin5: LCS~BEW '- rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented__ Additional requirements ............................................. INITIAL GEO. UNIT oN/OFF POOL CLASS STATUS AREA NO. SHORE Additional Re~arks: ~t/- J2_ /wmv ~- VP,'~,'~, / 0 ~Z ~0 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. ., No special*effort has been made to chronologically · organize this category of information. PROG.W3%M: LISC~_N REVISION: 5.2 Start of execution: Fri 15 SEP 89 ll:04a **** REEL HEADER **** LIS 89/09/11 ATLAS 01 'LIS CUSTOMER FO~/~AT TAPE' **** TAPE HEADER **** LIS 89/09/11 PART NUMBER: W5790-MI CRO 3965 01 'OPEN HOLE-DIFL, BHC, CN POR & CHCN: R~GE IS 10264-7236 FT.' FILE # 1 MA. IN .001 **** FILE HE~ER **** 1024 CN : B P EY3LO~ATION WN : W-32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ~ASKA MICROFILMED * FORMAT _RECORD (TypE# 64) ONE DEPTH PER FR~_~E T~3E DEPTH UNIT : F 15 CUR~S : NAME CODE S.~34PLE# UNIT 1 GR 68 Z RFOC 68 3 RILD 68 4 RILM 68 5 SPD 68 6 SP 68 7 CHT 68 1 .A_PI 1 O.~L~M 1 OHMM ! OF31M 1 F/MM ! MV 1 LB BYTES 4 4 4 4 4 4 4 lO AC 68 1 11 LSN 68 1 12 SSN 68 1 13 CN 68 1 14 CNC 68 ! 15 TEMP 68 1 US/F 4 CTS 4 CTS 4 PCT 4 PCT 4 DEGF 4 * DATA !~CORD DEPTH SPD AC TEMP 10264.000 0.0000000E+00 50.00000 100.0000 10214.000 21.99780 65.67659 100.0000 10164.000 22.99770 82.77667 196.5648 10114.000 23.99760 67.12849 197.6684 10064.000 23.99760 60.90010 198.6619 10014.000 21.99780 87.15298 199.3678 9964.000 21.99780 83.04543 199.7170 9914.000 21.99780 79.32863 199.3851 9864.000 21.99780 81.51529 198.8451 9814.000 21.99780 (TYPE# 0) GR SP LSN 0.0000000E+00 -80.00000 40.00000 0.0000000E+00 26.22380 40.00000 37.90756 -36.82610 104.3938 28.66333 -35.95781 194.9075 23.97083 -32.80478 259.0356 25.93779 -37.87691 106.7959 31.15489 -32.60080 122.9596 31.50786 -33.98805 117.9371 27.16614 -33.48372 122.4945 33.38632 -23.32281 966 BYTES * RFOC CHT SSN 0.2000000 500.0000 100.0000 16.79413 1219.208 100.0000 3.116443 1280.169 281.7346 10.84849 1278.962 364.3689 12.31971 1250.765 412.1882 3.940395 1236.677 278.7346 8.656876 1232.481 296.1511 10.43850 1239.593 297.9180 11.02247 1225.050 298.6865 4.395627 1232.204 RILD TTEN CN 0.2000000 3500.000 0.0000000E+00 6.554096 5233.035 0.0000000E+00 1.817318 5230.437 20.83714 5.317556 5237.504 10.87921 9.116060 5214.551 7.627994 2.888820 5178.594 19.76225 8.597374 5210.562 17.33122 10.73834 5257.477 18.74869 13.35011 5209.227 17.69083 1.795808 5254.074 RILM CILD CNC 0.2000000 0.0000000E+00 0.0000000E+00 6.152232 152.5763 0.0000000E+00 1.990307 550.2615 24.83714 5.710775 188.0563 14.87921 9.042822 109.6965 11.62799 2.687724 346.1621 23.76225 6.891888 116.3146 21.33122 8.429844 93.12427 22.74869 11.09870 74.90578 21.69083 2.419046 556.8525 9764.000 21.99780 57.86584 196.1381 9714.000 21.99780 85.75795 193.6353 9664.000 21.99780 81.67569 191.5097 9614.000 21.99780 131.5411 188.8921 9564.000 0.0000000E+00 50.00000 186.5049 221.6242 9.770210 281.4353 116.0684 7.343948 87.19189 67.29655 -75.77838 139.1278 69.91139 -102.0607 28.18770 66.55315 -80.00000 29.28130 143.4896 1326.542 451.5005 22.81221 1196.680 252.2066 11.97958 1464.116 319.0903 0.2221445 1320.283 148.3496 0.2000000 500.0000 141.2645 31.59389 5310.594 7.778061 20.74889 5151.020 23.19505 14.78392 5497.875 15.94688 12.27747 5135.816 64.88013 0.2000000 3500.000 53.35764 40.18146 31.65169 11.77806 18.34042 48.19534 27.19505 12.04894 67.64104 19.94688 10000.00 81.44998 68.88013 0.2000000 0.0000000E+00 57.35764 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 99 10264.00 ENDING TAPE DEPTH = 9528.00 FILE # 2 !~/EPEAT. 002 **** FILE HEB~ER **** 1024 * FORM_AT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME. TAPE DEPTH UNIT : F 15 CURVES : NAM~ ! GR 68 2 ~OC 68 3 RILD 68 4 RILM 68 5 SPD 68 6 SP 68 7 C~T 68 8 TTEN 68 9 CILD 68 10 AC 68 11 LSN 68 12 SSN 68 CODE SAMPLE# UNIT BPI OF_MM OHMM OHMM F/MM MV LB LB MM_~.O US/F CTS CTS BYTES 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH SPD AC TEMP 10264.000 0.0000000E+00 50.00000 100.0000 10214.000 18.99811 65.67381 100,0000 10164,000 22.99770 82.89351 192.6259 10114.000 23,99760 67.17378 194.3468 10064.000 23.99760 61,21378 195.8335 10014.000 23,99760 87,41002 196.7993 9964.000 23,76180 83,09169 197,2462 9914.000 23,99760 79,54480 197,2565 9864,000 23.99760 82.05464 196,8366 9814.000 23.99760 81.1749! 196.0860 9764.000 23.99760 (TYPE# GR SP LSN o) 0,0000000E+00 -80.00000 40.00000 0.0000000E+00 23,88725 40,00000 36,05731 -35.52855 108.7463 27.24855 -38.76501 166.9375 24.35300 -35.18773 251,0476 23.72069 -40,73734 106.6701 30.12857 -36,00574 122.6714 33,52425 -36.89497 116,5631 28,54494 -35,80226 118.6808 32.29181 -28,10429 120.5320 221,3025 3.980115 966 BYTES * RFOC CHT SSN 0.2000000 500.0000 100,0000 11.89302 1310,875 !00.0000 3,137457 1448,606 283.9565 10.78346 1446.413 353.4978 12.46667 1357,340 409.2166 3.976707 1383.410 278.9854 8.659033 1314.761 285,4199 10,56428 1303,079 285.8640 11.14167 1283.654 297.4084 4.657579 1226,662 291,6992 140.3446 1241.033 RILD TTEN CN 0.2000000 3500.000 0.0000000E+00 7.175526 5136.480 0.0000000E+00 2.047700 5225.098 19.77686 5.431269 5193.879 13.83505 9.156202 5210.809 8.075340 2.894109 5195.965 19.82788 8.581007 5176.336 16,34619 10.82071 5235.781 17.86047 13.36300 5211.590 18.50584 1.834265 5239,141 17.47067 36,42773 5343.461 RILM CILD CNC 0.2000000 0.0000000E+00 0.0000000E+00 5.725725 139.3626 0.0000000E+00 1.980515 488.3528 23.77686 5.760933 184.1190 17.83505 8.940767 109,2156 12.07534 2,693236 345,5295 23.82788 6.852036 116.5364 20.34619 8.429073 92.41541 21.86047 11.09525 74,83347 22.50584 2.616289 545,1775 21.47067 35,50754 27.45161 9714.000 23.99760 85.40182 192.1545 9664.000 23.99760 82.48570 189.9349 9614.000 23.99760 127.8732 187.3947 9564.000 0.0000000E+00 5O.0OOOO 184.5828 118.3137 2.797827 84.82661 63.76794 -79.89566 142.7821 65.78931 -109.5442 26.22070 66.78401 -8O.0O0OO 28.15970 29.04582 1325.035 253.2519 11.94865 1443.051 320.6299 0.2278942 1317.583 131.1492 0.2000000 500.0000 138.8683 20.08446 5391.941 24.33525 15.83877 5453.719 15.37100 15.39023 5157.465 57.65799 0.2000000 3500.000 55.90010 18.38037 49.78973 28.33525 11.61826 63.13623 19.37100 10000.00 64.97629 61.65799 0.2000000 0.0000000E+00 59.90010 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 100 10264.00 ENDING TAPE DEPTH = 9520.00 FILE # 3 CHCN .003 **** FILE HEADER **** 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT CURVES. · NkME CODE SAMPLE# UNIT BYTES 1 GR 68 1 A_PI 4 2 SPD 68 1 M/MM 4 3 CHT 68 1 LB 4 4 TTEN 68 1 LB 4 5 LSN 68 1 CTS 4 6 SSN 68 1 CTS 4 7 CN 68 1 PCT 4 8 CNC 68 ! PCT 4 9 TEMP .68 1 DEG 4 * DATA RECORD DEPTH LSN (TYPE# 0) 1006 BYTES * GR SPD SSN CN CHT CNC TTEN TEMP 29.39250 , 9570.000 29.22025 9520.000 28.22900 9470.000 27.87259 9420.000 27.23721 9370.000 27.14674 9320.000 27.42870 9270.000 33.52351 9220.000 39.76109 9170.000 42.10460 9120.000 40.69688 9070.000 35.56566 9020.000 24.61186 8970.000 25.29846 8920.000 24.98582 8870.000 27.11533 133.8709 67.64629 143.2599 70.89171 142.1157 83.50896 138.4844 74.85127 135.4168 71.91864 137.6512 77.87540 141.1054 67.23715 146.6880 60.27979 162.8024 57.76038 161.9218 53.79305 163.1808 59.79839 152.0623 74.36153 133.8839 70.29642 137.0294 65.65256 130.8977 65.55705 134.6777 47.64249 50.75909 55.71854 50.99490 60.00851 51.99481 58.71872 51.99481 57.97595 51.99481 60.68391 51.99481 62.43703 51.99481 44.42973 51.99481 39.72276 51.88560 35.79530 51.99481 38.15620 51.99481 42.64702 51.75900 73.08609 50.99490 70.70062 51.99481 64.30078 51.88560 59.26581 45.10542 1323.217 52.27690 1318.977 56.08636 1327.156 54.94104 1315.126 54.28146 1325.992 56.68613 1343.079 58.24287 1351.972 42.25253 1341.197 38.07277 1348.036 34.58522 1328.856 36.68169 1333.044 40.66949 1338.179 67.69916 1352.675 65.58089 1353.688 59.89787 1350.690 55.42685 183.9173 5127.402 183.9700 5109.699 183.7340 5101.879 183.4170 5087.156 182.8742 5011.477 181.6878 4997.383 181.3498 5000.707 180.5377 4959.965 179.7510 4953.656 179.1033 4946.094 178.5486 4907.875 177.7992 4886,723 176.9701 4829.477 176.1429 4829.363 175.2104 4798.289 174.2924 '8770.000 37.97763 8720.000 41.41692 8670.000 42.77878 8620.000 41.61569 8570.000 27.96857 8520.000 25.81285 8470.000 25.15900 8420.000 24.80260 8370.000 24.70287 8320.000 24.86589 8270.000 24.21741 8220.000 26.06453 8170.000 29.01817 8120.000 25.86923 8070.000 26.49898 8020.000 30'.64725 52.66699 158.4043 46.78545 169.3162 46.90071 160.9324 49.41978 164.4192 66.08427 131.0504 67.62383 135.7496 74.31807 127.9858 69.77321 124.9354 59.47401 128.3844 63.99687 129.0202 60.06267 127.4326 60.52618 127.7008 52.99107 135.5202 68.09692 127.4929 61.38046 130.3596 60.23875 140.6593 52.99471 40.80486 52.99471 39.51125 52.99471 34.56990 52.99471 37.55756 52.99471 50.65254 52.99471 66.06747 51.99481 61.18791 54.99451 58.86385 54.99451 63.91920 54.99451 63.98700 54.99451 66.15100 54.99451 55.21837 55.23030 50.17912 54.99451 55.88152 56.33942 56.58821 56.75850 49.30605 1356.298 39.03366 1349.504 37.88495 1364.007 33.49707 1343.525 36.15009 1337.499 47.77834 1347.062 61.46667 1349.723 57.13367 1342.965 55.06992 1354.735 59.55904 1365.758 59.61923 1346.084 61.54085 1354.862 51.83275 1358.017 47.35794 1358.214 52.42163 1363.014 53.04916 1359.980 46.58266 4724.758 172.6593 4679.316 172.0663 4688.555 171.4577 4696.750 170.9189 4606.918 170.3417 4628.242 169.6798 4552.762 165.9065 4545.711 165.8852 4524.871 165.7306 4513.859 165.4876 4469.777 165.0785 4445.039 164.5933 4427.238 164.0305 4422.531 163.4907 4383.969 162.8568 4357.187 162.3508 27.61990 127.0304 48.78629 46.12111 161.8105 7920.000 64.93549 55.99442 1365.918 4309.734 25.22173 128.1698 60.11090 56.17729 161.1524 7870.000 58.85503 56.23021 1361.899 4293.285 22.63687 122.0529 69.38460 64.41226 160.6065 7820.000 63.39035 56.99429 1367.816 4285.641 25.29358 127.1895 58.72815 54.94942 159.9503 7770.000 68.14107 55.99442 1368.909 4284.406 24.61057 126.7341 62.03017 57.88158 159.2879 7720.000 62.72450 55.99442 1343.781 4223.227 25.15828 128.7259 61.640'08 57.53519 158.6128 7670.000 65.93582 56.64929 1374.160 4206.363 27.09283 133.8879 57.06395 53.47162 157.9798 7620.000 48.46228 56.64929 1385.256 4168.258 22.31256 122.3472 73.46254 68.03345 157.4551 7570.000 57.94904 55.99442 1388.036 4132.676 22.62308 122.1640 69.54964 64.55882 156.9429 7520.000 59.64999 56.10361 1371.445 4117.391 25.65550 122.2674 52.48117 49.40215 156.2719 7470.000 53.42345 55.99442 1384.745 4115.250 22.60849 119.6931. 67.48015 62.72113 155.6996 7420.000 60.28827 56.10361 1388.727 4091.282 22.92630 119.7021 64.28967 59.88800 155.1093 7370.000 86.63252 57.99420 1380.923 4037.550 23.45393 122.4543 63.95033 59.58667 154.4151 7320.000 96.84717 57.88501 1389.747 4033.218 26.03967 129.2081 56.82454 53.25902 153.7283 7270.000 108.7663 0.0000000E+00 21.40779 121.8292 81.03122 500.0000 74.75438 35O0.OOO 152.9688 TOTAL DATA RECORDS : STARTING TAPE DEPTH = 191 9620.00 ENDING TAPE DEPTH = 7236.00 **** TAPE TRAILER **** ~LIS 89/09/11 3965 0! TOTAL RECORDS IN THIS LOGICAL TAPE : 403 **** REEL TRAILER **** LIS 89/09/11 ATLAS 01 TOT.AL RECOPDS IN THIS LOGIC.AL REEL : 404 TOT.AL RECORDS IN THIS PHYSICAL P~EL: 404 End of execution: Fri 15 SEP 89 ll:08a Elapsed execution time = 4 minutes, 24.4 seconds. SYSTEM ~TURN CODE = 0 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD W - 32 500292197000 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 25-FEB-94 3965.01 K. BRUNNER C. HUGHES 21 liN 12E 735 1442 91.90 90.90 53.20 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) lST STRING 2ND STRING 9.625 9655.0 3RD STRING 5.500 10240.0 PRODUCTION STRING 3.500 9380.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 03-DEC-82 SWS BASELINE DEPTH 9611.5 9617.5 9638.5 9660.0 9662.5 9663.0 9675.5 9702.5 9703.0 9703.5 9704.5 9708.0 9714.5 GRCH 9613.0 9619.0 9639.5 9661.0 9663.0 9663.5 9677.0 9704.0 9705.0 9705.5 9706.0 9709.5 9715.5 EQUIVALENT UNSHIFTED DEPTH 47.00 17.00 9.20 9715.0 9732.0 9739.5 9742.0 9770.5 9771.0 9771.5 9774.5 9777.5 9780.5 9787.0 9789.5 9799.0 9800.0 9804.0 9804.5 9812.0 9812.5 9814.0 9815.0 9818.0 9822.5 9823.0 9825.0 9828.0 9831.0 9840.5 9847.0 9952.0 9953.0 9962.5 9963.0 $ REMARKS: 9716.0 9733.5 9741.0 9743.0 9771.5 9772.5 9773.0 9775.5 9778.5 9781.0 9787.5 9790.5 9800.0 9800.5 9804.5 9805.5 9813.0 9814.0 9815.5 9816.0 9818.0 9822.5 9823.5 9825.5 9829.0 9832.0 9840.5 9847.5 9952.5 9953.0 9962.5 9963.0 PDK-100/GR Log. LOG TIED INTO CBT RUN 14-SEP-89. LOGGING PROGRAM ORGANIZATION: 1. SHUT-IN WELL @ 2000 HRS 10-FEB-94. 2. LOGGED 3 PASSES SHUT-IN WITH 1600 PSI. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR EACH PASS. THE CURVE IS NAMED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS: BOREHOLE SIZE = 8" CASING SIZE = 7" SALINITY = 0 PPM OPEN HOLE GAMMA RAY FOR DEPTH MATCHING DOWNLOADED FROM BP EXPLORATION UPS/CSS ON 24-FEB-94. SHIFT PROCEDURE AS FOLLOWS: 1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS OPEN HOLE GAMMA RAY. 2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST GAMMA RAY. 3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS SGMA. PRODUCTION RATES 07-FEB-94: OIL WATER GAS GAS LIFT CHOKE WHP = .38 MBOPD = .65 MBWPD = 1.04 MMSCFD = 1.42 MMSCFD = 104 = 261 PSIG @ 131 DEGF / ??MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9595.0 PDK 9607.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH SGMA 9590.0 9590.0 9625.0 9627.5 9651.5 9651.5 9~5.0 9654.5 9~0.0 9659.5 9675.0 9677.0 9676.5 9677.5 9677.0 9678.0 9677.5 9679.0 9682.0 9683.0 9685.5 9687.0 9686.0 9688.0 9686.5 9688.5 9697.5 9698.5 9702.5 9703.5 9703.5 9704.5 9704.5 9705.0 9705.5 9706.0 9706.5 9706.5 9707.0 9707.0 9721.5 9723.0 9730.5 9732.0 9732.0 9734.0 9733.5 9735.5 9734.5 9736.0 9735.0 9736.5 9735.5 9737.5 9736.0 9738.0 9737.0 9738.5 9755.5 9757.0 9766.0 9767.0 9777.5 9778.5 9780.5 9781.5 9791.5 9792.5 9794.5 9796.0 9796.5 9798.0 9798.5 9800.0 9804.0 9805.0 9809.0 9809.5 for each pass in separate files. STOP DEPTH 9976.0 9988.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 9812.0 9818.5 9822.0 9822.5 9828.0 9834.0 9839.0 9843.0 9849.5 9860.0 9869.5 9878.0 9879.0 9883.0 9889.0 9892.0 9892.5 9893.5 9895.0 9895.5 9899.0 9950.0 9950.5 9954.0 9958.0 10000.0 $ REMARKS: 9813.0 9819.0 9822.5 9823.5 9829.0 9835.0 9839.5 9843.5 9850.0 9860.5 9870.0 9878.5 9879.0 9883.0 9889.0 9892.5 9893.0 9893.5 9895.0 9896.0 9899.0 9950.5 9951.0 9954.0 9958.0 10000.0 PASS 1. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ??MATCH1B . OUT $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code 1 GRCH PDK 68 2 BIF PDK 68 3 BKL PDK 68 4 BKS PDK 68 5 CSLS PDK 68 6 LS PDK 68 Samples Units Size 1 GAPI 4 1 4 1 CPS 4 1 CPS 4 1 CU 4 1 CPS 4 API API API API Log Crv Crv Length Typ Typ Cls Mod 4 00 201 24 1 4 00 201 24 1 4 00 201 24 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 7 MSD PDK 68 1 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 1 13 SGMB PDK 68 1 14 SS PDK 68 1 15 SGNT PDK 68 1 * DATA RECORD (TYPE# 0) Total Data Records: 55 CU CU CU CPS CU 4 4 00 201 24 4 4 00 201 24 4 4 00 201 24 4 4 O0 201 24 4 4 00 201 24 4 4 00 201 24 4 4 00 201 24 4 4 00 201 24 4 4 00 201 24 60 966 BYTES * Tape File Start Depth = 10000.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13137 datums Tape Subfile: 2 290 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9595.0 PDK 9607.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 for each pass in separate files. STOP DEPTH 9976.0 9988.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9601.0 9612.5 9613.5 9615.5 9616.5 9618.5 9618.5 9619.5 9619.0 9620.0 9619.5 9627.0 9626.0 9632.5 9631.5 9640.0 9640.5 9643.0 9643.5 9644.0 9644.5 9644.5 9645.0 9645.5 9646.5 9645.5 9650.0 9650.0 9655.0 9654.5 9660.5 9660.0 9661.0 9661.0 9661.5 9662.5 9662.5 9663.0 9663.0 9663.0 9670.0 9671.5 9674.5 9676.0 9676.0 9677.5 9677.0 9678.0 9678.5 9678.0 9679.0 9686.5 9687.5 9687.0 9688.5 9688.0 9687.5 9689.0 9689.5 9691.0 9690.0 9692.0 9691.5 9693.5 9692.5 9694.0 9693.0 9694.5 9694.0 9695.0 9695.5 9697.0 9697.0 9698.0 9702.5 9703.0 EQUIVALENT UNSHIFTED DEPTH SGMA 9601.0 9704.0 9705.0 9706.5 9707.5 9708.0 9710.0 9719.5 9721.5 9726.0 9730.5 9732.5 9736.5 9737.5 9755.5 9766.0 9771.0 9775.0 9777.0 9781.0 9801.0 9802.5 9803.0 9804.0 9804.5 9814.5 9815.0 9815.5 9818.0 9822.0 9822.5 9828.5 9834.0 9836.5 9837.5 9875.5 9876.0 9876.5 9877.0 9878.0 9887.5 9888.0 9888.5 9889.5 9892.0 9902.5 9904.5 9905.5 9916.0 9947.5 9952.0 9958.5 9960.0 9960.5 9961.0 9961.5 9962.5 9963.0 9965.5 9967.5 9968.5 9705.0 9731.5 9734.0 9738.0 9738.5 9772.0 9776.5 9778.5 9782.0 9804.0 9804.5 9805.5 9815.5 9818.5 9822.5 9823.5 9829.5 9834.5 9903.0 9952.0 9960.5 9961.5 9962.0 9962.5 9963.0 9704.5 9705.0 9706.5 9707.0 9708.0 9710.0 9720.5 9722.5 9727.5 9757.0 9767.0 9802.0 9803.0 9815.5 9816.5 9837.5 9838.0 9876.0 9876.5 9877.0 9877.5 9878.0 9887.5 9888.5 9889.0 9889.5 9892.5 9905.0 9905.5 9916.0 9948.0 9959.0 9960.0 9962.5 9966.0 9968.0 9968.5 9970.5 9971.0 9985.5 9990.0 9990.5 $ REMARKS: 9986.5 9991.0 9991.5 9970.5 9971.0 PASS 2. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ??MATCH2A . OUT /??MATCH2B.OUT $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 MSD PDK 68 1 CU 4 8 RATO PDK 68 1 4 9 RBOR PDK 68 1 4 10 RICS PDK 68 1 4 11 RIN PDK 68 1 4 12 SGMA PDK 68 1 CU 4 13 SGMB PDK 68 1 CU 4 14 SS PDK 68 1 CPS 4 15 SGNT PDK 68 1 CU 4 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 4 00 201 24 60 * DATA RECORD (TYPE# 0) Total Data Records: 55 966 BYTES * Tape File Start Depth = 10000.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13137 datums Tape Subfile: 3 191 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9595.0 PDK 9607.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 9601.0 9610.5 9613.0 9614.0 9613.5 9617.0 9617.5 9620.0 9631.0 9642.5 9643.5 9643.5 9644.0 9644.0 9645.5 9646.5 9650.0 9655.0 9660.0 9660.5 9661.0 9661.0 9661.5 9662.0 9662.5 9663.0 9663.5 9674.5 9676.0 9675.0 9676.5 9675.5 9676.0 9676.5 9677.0 9677.0 9685.5 9686.0 9686.0 9687.0 9686.5 9690.0 9690.5 9692.0 9693.0 9693.5 9694.5 9702.5 for each pass in separate files. STOP DEPTH 9976.0 9988.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 9597.5 9607.0 9612.5 9616.0 9617.0 9619.5 9629.5 9644.0 9645.5 9646.0 9649.5 9654.0 9659.0 9659.5 9661.0 9662.0 9662.5 9676.5 9677.0 9677.5 9686.5 9687.5 9691.0 9692.0 9693.5 9694.0 9694.5 9695.0 9703.0 9703.5 9704.5 9705.5 9706.5 9708.0 9710.0 9723.0 9729.5 9732.5 9737.0 9738.0 9752.5 9753.5 9760.0 9762.5 9766.0 9775.0 9775.5 9776.5 9780.5 9781.5 9788.5 9791.5 9792.0 9800.5 9802.5 9803.0 9804.0 9805.0 9805.5 9814.0 9815.0 9822.0 9827.0 9837.0 9838.0 9838.5 9840.5 9842.0 9849.5 9855.0 9858.0 9859.0 9875.5 9876.5 9877.5 9878.0 9885.5 9886.5 9887.0 9887.5 9888.0 9889.0 9892.0 9892.5 9893.5 9899.0 9899.5 9900.0 9903.0 9706.5 9707.0 9708.5 9724.0 9753.5 9754.0 9763.0 9776.0 9776.5 9777.0 9781.0 9781.5 9789.0 9814.5 9815.0 9822.0 9827.5 9842.0 9849.0 9858.5 9859.0 9885.5 9886.0 9887.0 9887.5 9893.0 9902.5 9703. 5 9704.5 9705.0 9709.5 9730.5 9734.0 9738.5 9739.0 9761.0 9766.5 9792.0 9793.0 9801.5 9803.0 9803.5 9804.0 9805.0 9806.0 9837.5 9838.0 9839.0 9841.0 9855.0 9875.5 9876.0 9877.0 9878.0 9888.0 9888.5 9892.5 9893.0 9893.5 9899.0 9899.5 9900.0 9907.0 9908.0 9910.5 9947.5 9948.0 9949.0 9962.5 9968.0 9970.5 9974.5 9975.0 9985.5 9990.0 9990.5 $ REMARKS: 9962.0 9986.5 9991.0 9991.5 9907.0 9907.5 9910.0 9948.0 9948.5 9949.0 9968.0 9970.0 9974.0 9974.5 PASS 3. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ? ?MATCH3A . OUT / ??MATCH3B. OUT $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GRCH PDK 68 1 GAPI 4 BIF PDK 68 1 4 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 4 CSLS PDK 68 1 CU 4 LS PDK 68 1 CPS 4 MSD PDK 68 1 CU 4 RATO PDK 68 1 4 RBOR PDK 68 1 4 RICS PDK 68 1 4 RIN PDK 68 1 4 SGMA PDK 68 1 CU 4 SGMB PDK 68 1 CU 4 SS PDK 68 1 CPS 4 SGNT PDK 68 1 CU 4 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 60 * DATA RECORD (TYPE# 0) Total Data Records: 55 966 BYTES * Tape File Start Depth = 10000.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26274 datums Tape Subfile: 4 200 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS PDK GRCH $ REMARKS: 1, 2, 3 1 AVERAGED PASS. PASSES 1, 2, & 3 WERE AVERAGED. $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units 1 GRCH PNAV 68 1 GAPI 2 BKL PNAV 68 1 CPS 3 BKS PNAV 68 1 CPS 4 BIF PNAV 68 1 CPS 5 CSLS PNAV 68 1 CU 6 LS PNAV 68 1 CPS 7 MSD PNAV 68 1 CU 8 RATO PNAV 68 1 9 RBOR PNAV 68 1 10 RICS PNAV 68 1 11 RIN PNAV 68 1 12 SGMA PNAV 68 1 CU 13 SGMB PNAV 68 1 CU 14 SS PNAV 68 1 CPS 15 SGNT PNAV 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 4 71 784 90 5 60 * DATA RECORD (TYPE# 0) Total Data Records: 55 966 BYTES * Tape File Start Depth = 10000.000000 Tape File End Depth = 9590.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26274 datums Tape Subfile: 5 77 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9594.0 PDK 9606.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9990.0 10002.0 il-FEB-94 FSYS REV. J001 VER. 1.1 1639 Il-FEB-94 10199.0 9994.0 9610.0 9988.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR S INKER BAR PDK PDK-100 $ TOOL NUMBER 2725XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10240.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 700 FAR COUNT RATE HIGH SCALE (CPS): 3200 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 G1 PDK 68 1 CPS 4 9 G2 PDK 68 1 CPS 4 10 ISS PDK 68 1 CPS 4 11 LS PDK 68 1 CPS 4 12 MON PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SPD PDK 68 1 F/MN 4 21 SS PDK 68 1 CPS 4 22 TEN PDK 68 1 LB 4 23 SGNT PDK 68 1 SU 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 O0 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 92 * DATA RECORD (TYFE~ O) 966 DYTE$ * Total Data Records: 164 Tape File Start Depth = 10002.000000 Tape File End Depth = 9594.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 65467 datums Tape Subfile: 6 238 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9594.0 PDK 9606.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9991.0 10003.0 Il-FEB-94 FSYS REV. J001VER. 1.1 1709 il-FEB-94 10199.0 9994.0 9610.0 9988.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 $ TOOL NUMBER 2725XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10240.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.OO0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 700 FAR COUNT RATE HIGH SCALE (CPS): 3200 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 2. $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 G1 PDK 68 1 CPS 4 9 G2 PDK 68 1 CPS 4 10 ISS PDK 68 1 CPS 4 11 LS PDK 68 1 CPS 4 12 MON PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SPD PDK 68 1 F/MN 4 21 SS PDK 68 1 CPS 4 22 TEN PDK 68 1 LB 4 23 SGNT PDK 68 1 SU 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 92 * DATA RECORD (TYPE# O) 966 BYTES * Total Data Records: 164 Tape File Start Depth = 10003.000000 Tape File End Depth = 9594.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 65563 datums Tape Subfile: 7 238 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9591.0 PDK 9602.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 9991.0 10003.0 il-FEB-94 FSYS REV. J001 VER. 1.1 1737 il-FEB-94 10199.0 9994.0 9610.0 9988.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 $ TOOL NUMBER 2725XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10240.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 700 FAR COUNT RATE HIGH SCALE (CPS) : 3200 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN : BP EXPLORATION WN : W - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 23 Curves: Name Tool Code Samples Units API API API API Log Crv Crv size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 G1 PDK 68 1 CPS 4 9 G2 PDK 68 1 CPS 4 10 ISS PDK 68 1 CPS 4 11 LS PDK 68 1 CPS 4 12 MON PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SPD PDK 68 1 F/MN 4 21 SS PDK 68 1 CPS 4 22 TEN PDK 68 1 LB 4 23 SGNT PDK 68 1 SU 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 92 * DATA RECORD (TYPE~ 0) 966 DYTES * Total Data Records: 164 Tape File Start Depth = 10003.000000 Tape File End Depth = 9594.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 104756 datums Tape Subfile: 8 238 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 9 is type: LIS 94/ 2/28 01 **** REEL TRAILER **** 94/ 2/28 O1 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 28 FEB 94 9:25a Elapsed execution time = 18.29 seconds. SYSTEM RETURN CODE = 0