Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
189-032
Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~¢'~ ~~=ile Number of Well HiStory File PAGES TO DELETE Complete RESCAN E3 Color items - Pages: Grayscale, halftones, piCtures, graphs, charts- Pages: Poor Quality Original- Pages: E] Other- Pages: DIGITAL DATA Diskettes, No. Other, No/Type OVERSIZED Logs of various kinds n Other COMMENTS' Scanned by: Beverly Bren(~n~'"~'%n 'Nathan Lowell Date: TO RE-SCAN Notes: Re-Scanned by: Beverty(Bren~)Vincent Nathan Lowell NOTScanned.wpd - =uG=_'NG~= LOC_%TION Sta~e cf Alaska OQ ----, --. oo Wei! Name Cpera==r .~ker '.:o8c o= place: Locaclcn Clearance: Conclusions .o L STATE OF ALASKA ~S ALA AND GAS CONSERVATION C ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [~] Oil [~] Gas r"l Suspended ~ Abandoned r"l Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 189-032 301-135 3. Address ' 8. APl Number ' P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21929-00 4. Location of well at surface ~TtONI ~; Unit or Lease Name 626' SNL, 1180' WEL, SEC. 21, T11N, R12E, UM i~: ~~1 Prudhoe Bay Unit At top of productive interval ..".~ 2279' NSL, 1355' EWE, SEC. 15, T11N, R12E, UM 13. Well Number At total depth ~~ l W-21 2936' NSL, 1943' NWL, SEC. 15, T11N, R12E, UM 5. Elevation in feet (indicate KB, DF, etc.) !6. Lease Designation and serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 90.90' ADL 028263 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. DirectiOnal Survey 1 20. Depth where SSSV set121. Thickness of Permafrost 11514 9103 FTI 11391 9085 FTI DYes BaNoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run EWR / GR, FDC Poro, MWD GR / RES Plus Directional (MD + TVD) ~r . CASlN~., LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE S~ZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor SUrface 110' 13-3/8" 68# L-80 Surface . 2710' 17-1/2'I ~140 cuft Cold Set II, & III 9-~/8" 47# NT80S Surface 10121' 12-1/4" ZI~ cu ft Class 'G' 5-1/2" 17# L-80 98,68' 1151.4' 8-1/2" 550 c.u ft Class 'G' r 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) , S~ZE DEPTH SET (MD) PACKER SET (MD) None 3-1/2", 9.2#, L-80 9419'- 9862' 9784' MD TVD MD TVD (Below EZSV) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DE. PTH INTERVAL (MD) . AMOUNT & KIND OF MATERIAL USED 9850' P&A w/65 Bbls Class 'G' 9347' .~et EZSV w/Whipstock on top 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test HOurs Tested PRODUCTION FOR OIL-BBL GAS-McF WATER'aBE CHOKE SIZE ~ GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-aBE (~AS-MCF WATER-aBE OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief descriPtiOn of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core No core samples were taken. 0 7 ZO0 ~1~i ~lk I ~ I Form 10-407 Rev. 07-01-80 0 RIG INA L ,,o,s 200~ubmitlnDuplicate 29. Geologic Markers 30. Formation Tests , ~ Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. Sag River 10117' 8802' Shublik A 10192' 8833' Zone 4 10620' 8957' RECEIVED 0 ? 2002 31. List of AttaChments: Summary of Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ~/'~ ~ Title Technical AssiStant Date 0,~" 0~¢:~"~'~ W-21 189-032 301-135 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 ,"aD 24: if this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ORIGINAL Well: W-21A Rig Accept: 10/22/01 Field: Prudhoe Bay Unit Rig Spud: 10/26/01 APl: 50-029-21929-01 Rig Release: 11/18/01 Permit! 20!~!!! ~ ~ Drillin~l Ri~: Nabors 9ES PRE-RIG WORK 06/05/01 PPPOT-T, PPPOT-IC 06/08/01 RUN 2.7" CENT TO 9811' SLM. RDMO. TALK W/PAD OPERATOR. WELL LEFT SHUT IN. 06109/01 RIH W/2.1" BDN, TAG 2 7/8" DP STUB AT 10320' CTM. LOAD AND KILL WELL AT 5 BPM W/WELL ON VACUUM. MIX AND PUMP 65 BBLS CLASS G AT 13.8 #/GAL.TBG X IA COMMUNICATION. RE-LOAD TO RE- CEMENT. RIH TO TAG TOP OF CEMENT AT 9889' CTD, PUH, PT CEMENT PLUG 1550 PSI (LOST 30 PSI IN 30 MIN). RIH TO RETAG AT 9889' CTD, WITHIN PROGRAM WINDOW. POOH. 06/10/01 TAG CEMENT TOP AT 9889' CTD, WITHIN PROGRAM WINDOW. PT PLUG TO 1550 PSI, LOST 30 PSI/30 MIN. POOH, FREEZE PROTECT COIL WITH 60/40 METH. LEAVE 500 PSI ON WELL. WELL NOT FREEZE PROTECTED : 06/11/01 DRIFT 2.70 SWAGE & TAG TOC @ 9850' RKB. SET SSC-SUB @ 3043' RKB. PULL CA R20 RK (GENERIC 1500#) FROM STA-7 @ 2979' MD. RIG CIRCULATE FLUIDS. SET CA RD RK (DUMMY) IN STA-7. PULL C-SUB. L~al Well Name: W-21 Common Well Name: W-21A Spud Date: 3/26/1989 ! Event Name: REENTER+COMPLETE Sta~: 6/9/2001 End: 11/18/2001 Contractor Name: NABORS Rig Release: 11/18/2001 Rig Name: NABORS 9ES Rig Number: ~2001 19:30 - ~:00 4.~ MOB N DFAL PRE Wa~ing on ~11 preparation. ~10~001 00:~ - 11:~ 11.00 MOB N DFAL PRE WaE on W-21A ~11 prop. 11:~ - 22:~ ' 11 .~MOB =P PRE Move in & ~ up Nabom Rig 7 ES. RIG ACCEPTED ~ 22~ HRS 11 June 2~1. 22:00 - 22:~ 0.~ MOB P PRE Pre spud sa~ m~ting & PJSM. 22:~ - 23:~ 0.50 MOB P PRE Install ~ndaw annular va~ & ~ h~h pressure hoses. 23:~ - ~:~ 1.~ MOB P PRE P~ & ~ DSM lub~tor to pull ba~ pressure va~e. 611112~1 ~:00 - 01:30 1.50 ~B P PRE Pull ba~ pm~um vabe & ~ DSM lub~tor. 01:30 - 03:~ 2.~ RIGU P PRE ~ to X~s ~e w/h~h pm~um ~se & pressure ~st tubing to 15~ psi. Annular p~um in~as~ to 1~ psi as ~11 as tubi~ pressure. Ho~ pressure ~r ~ min - OK. B~ off pm~um. No~ - T~t pressure ~s ~a~ & m~. A~, Mr. John Crisp, was a~ & ~ to ~ne~ pre,urn t~ & BOP ~st. 03:30 - 11:30 8.00 RIGU P PRE PJSM. ~ Hailibu~on slimline unE. P~ & ~ lubd~tor. RIH wi 2.70" gauge Hng & tag top ~ ~ment ~ 98~. POH. P~ & RIH wi 3 1~ slip stop ~t~er & s~ ~ 3~3'. POH. ~ & RIH w/dummy plug ~t~r & pull dummy from G~ ~ 2979'. POH.S~ ba~ lub~tor. 11:30 - 13:30 2.~ RIGU P PRE PJSM. ~ & ~l~e ho~ displadng f~ze pmt~ d~l. Pump rote = 3 bpm ~ 120 psi. 13:30 - 17:~ 3.~ RIGU P PRE WU & RIH ~h slimline wi dummy. Instil same in G~ ~ 2979'. R~ver ~t~r ~ ~3' POH & ~ Hallibu¢on 17:~ - 22:30 5.~ RIGU P PRE ~ S~u~er E ~ne ~w~. P~ & RIH wi CCL & ~bing ~Eer (~mi~l). Run CCI ~ 9795' to ~ ~r ~tion. C~ 3 1~" tubi~ ~ 9720'. POH & ~ S~lum~er. ~1~1 ~:00 - ~:30 0.~ [~SUR P DEC~P ~t ~C ~Ne. Test ~1~ to 1,5~ psi - ~ay. ~:30 - 01:30 1.~ WHSUR P DECOMP ND ~ a~ ad~tor. 01:~ - ~:30 3.~ ~SUR P DEC~P NU ~PE. ~:30 - ~:30 5.~ ~SUR P DEC~P PJSM. T~t BOPs - Up~r Pi~ Rams, BIi~ Rams 250~,500 ~i - ~ay. Test - Chk line and vanes, HCR ~s, ~11 Line valves 2~,~ ps,kay. 09:~- 11:30 2.~ BOPSUF:N RREP ;DECOMP Repaira~mu~tor. 11:30 - 12:~ 0.~ BOPSUF:P DEC~P Test Annu~r ~P, Up~r~r Kelly ~ vanes, Ball valve, ~W vane - ~,5~ psi - okay. All test~ for 10 rain H~ow. Test ~ne~ing wa~ by John Crisp - A~CC. 12:00 - 13:~ 1 .~ BOPSUF.P DECOMP RD~D test joint I plug. 13:00 - 14:~ 1.~ BOPSUF P DECOMP Pull ~C, wi lubH~tor. 14:~ - 14:30 0.~ BOPSUF P DECOMP Ba~ out L~ d~ studs. 14:30 - 18:00 3.~ PULL P DECOMP AEempt to pull Hanger to ~ fl~r. Wo~ up 2~K, d~n 110K, ~ile pumping ~1~ BPM, ~ 880 psi. 18:~ - 19:30 1 .~ PULL P DECOMP RU ~mline I~em. 19:30 - 21:~ 1.~ PULL P DECOMP RIH wi Jet Cu~r and cut at 9,6~' W~. 21:~ - 21:30 0.~ PULL P DEC~P RD ~mline. 21:~ - ~:~ 2.~ PULL P DEC~P Wo~ ~ up 2~K, d~n 110K. RU ~mline I~gem to mn F~int suwey. (flint t~l did not ~n~ion). 6113~1 00:~ - 01:30 1.50 PULL N SFAL DECOMP Chg he~ on F~int t~l. Co~ ~mputer problem ~ntroling tool ~n~ion. 01:30 - 02:30 1 .~ PULL P DECOMP PJSM. Hang I~gem sheve in ~. 02:30 - ~;00 1.50 PULL P DEC~P RIH wi F~point ~:~ - 05:00 1.~ PULL P DE~MP Stmt~ pi~, ~ke FP suwe~. L~gem indi~t~ ~ pi~ at i , , , Printed: 11119/2001 10:05:44 AM Legal Well ~ame: W-21 Co~on Weft ~ame: W-21A 8pud Btt~: ~12811~8~ Event ~ame: REEnTER+COMPLETE 8ta~: 6/912001 End: 11/1812001 Contractor Name: NABORS Rig Release: 11118/2001 Rig ~ame: ~ABORS 9ES Rig ~umber: 6/13/2001 ~:00 - 05:00 1.00 PULL P DECOMP 9,620'. 05:00 - ~:~ 1.00 PULL P DECOMP POOH wi FP t~l. ~:~ - 07:~ 1.~ PULL ~P DECOMP ~ Frae Point t~l, Change to Jet C~er. 07:~ - 08:~ 1.50 PULL P DECOMP RIH wi Jet Cu~r. Pull 20K over and ~t at 9,590'. P~H. 08:30 - 10:00 1.~ PULL P ~DECOMP Affempt to pull tubing string- 200K. Pi~ not f~. 10:00-12:00 2.~ PULL P DECOMP ClOF~PointtoCCLand~htbar. RIH and ~g up at 9,575'. P~H. 12:~ - 15:~ 3.00 PULL N :WAIT DECOMP Wa~ on Suer ~ Cuffer. RU Same. 15:~-17:~ 2.50 PULL P DEC~P RIHwlSu~r~tC~er. Pull 30K over. Make~tat9,~0' WLD. ~H. 17:30 - 20:00 2.~i PULL P DECOMP Wo~ ~ 195K up. Unab~ to move. Change to FP tool. 20:00 - 23:30 3.50 PULL P DEC~P RiH wi FP t~l. Pull 2~K. FP t~l indi~t~ f~ pi~ at: 9,250', 9,263' 9,~8', 9,425', 9,530'. No t~l response(no strain in pi~) at 9,~0' (top ~ at 9,~0'). 23:~ - 00:~ 0.50 PULL P DECOMP ~OH. ~O to ~emi~l ~r. ~141~1 00:~ - 01:~ 1 .~ PULL P DEC~P RIH wi Chem ~er. 01:~-01:30 0.50 PULL P DEC~P Pull,Ko, r, ~at9,419'WLD. 01:30-02:~ 0.50 PULL P DEC~P P~Hw/~Eer. 02:~ - ~:~ 2.~ PULL P DECOMP Wo~ t~ to 2~K. R~measum stret~ and weight PU. ~:~ - 07:~ 3.~ PULL P DECOMP WaE on n~ Chem ~ffer. RU same. 07:~ - ~:00 2.~ PULL P DECOMP RIH wi Chem ~ffer. Pull 20K o~r and cut at 8,185'. POOH. 09:~ - ~:30 0.50 PULL P DECOMP PU on t~ (I~K up) and pull ~ hngr to ~ fl~r. 09:30 - 10:30 1.00 PULL P DEC~P RD ~line I~gem. 10:30 - 12:~ 1.50 PULL P DEC~P RU t~ ~uip, and ~ntml line s~ling unE. 12:~ - 12:30 0.50 PULL N DECOMP CIO s~li~ unE. 12:~ - 15:~ 2.50 PULL P DEC~P P~H wi ~pl asmb~ and ~1~", 9.2 ppf L~0 LDS ~. Re~ver 5 SS ~nds, ~ ~ntml line bands. 15:~ - 15:30 0.~ PULL P DECOMP RD ~ntrol line spooli~ unE. 15:~ - 20:~ 4.50 PULL P DECOMP Cont. POOH wi ~ - to~l m~W = 255 j~ +10.~' cut off. 20:~ - 20:30 0.~ PULL ;P DEC~P RD ~ ~uip., ~an ~ ~r. 20:~ - 21:30 1.~ PULL P =DECOMP Install test plug. Pmk. test 2~ psi - 10 rain - okay. 21:~ - ~:~ 0.50 PULL P DEC~P Instil WB. 22:~ - 23:~ 1.50 PULL P DEC~P PU fish~ t~ls. 23:~ - ~:~ 0.50 PULL P DEC~P MU B~ ~1 - ~hing t~. W15~001 ~:~ - 03:~ 3.~ PULL = DEC~P MU ~em~EJam - B~. Drop~ B~ 2'. Sh~ d~ for sa~ m~ti~s, m~ial a~ions and h~ eliminations. Reto~ue ~nne~ns. 03:00 - ~:30 3.50 PULL ~ DECOMP ~RIH to 3,6~'. ~:30 - 07:30 1 .~ PULL P DECOMP Cut a~ sl~ 1~' of drill line. 07:30 - ~:30 1.~ PULL P DECOMP ~w~ Top D~e. 08:30-11:~ 2.~ PULL P DECOMP RIH to 8,128'. TagTOFat8,181',175Kup. Pump5bbFmin, 311 psi, 175K up. Engage fish, jar to 250K up. 11:00 - 11:30 0.50 PULL P DECOMP Pull ~ wi I~K over. Pull wEh 75K drag from 8,181-8,151'. monitor well. '11:30 - 17:00 5.~ PULL P DECOMP P~H. 17:~ - 17:30 0.~ PULL P DECOMP Stand ba~ B~. 17:30 - 18:~ 0.50 PULL P DECOMP RU t~ handling equip. 18:~ - ~:~ 2.~ PULL P DECOMP ~H, LD fish. Re~ver 1,223' of fish - ~ ~ of 3-1~", 9.2 p~, L~0 ~, 2 GLM. Top ~off = 20.6', b~ ~toff = 15.7'. Found ~ment on ~ ~llam. 20:~ - 21:~ 1.~ PULL P DECOMP LD ~emhot a~ a~ll. jar. 21:~ - 21;30 0.~ PULL ;P DECOMP C~ar and ~an ~ ~r. 21:~ - 22:~ 1 .~ PU~ P DECOMP PU~U B~ ~2 to ~a~ge ~mugh t~ht r ,r , Printed: 11119/2001 10:05:44Aid Legal Well Name: W-21 Common Well Name: W-21A Spud Date: 3/26/1989 Event Name: REENTER+COMPLETE Start: 6/9/2001 End: 11/18/2001 Contractor Name: NABORS Rig Release: 11118/2001 Rig Name: NABORS 9ES Rig Number: 6115/2001 22:30 - 00:00 1.50 PULL P DECOMP RIH to $,080'. 6/16/2001 00:00 - 03:30 3.50 CLEAN P DECOMP Cont. RIH to 9,405' DLM, and tag top of cutoff stump. 03:30 - 05:00 1.50 CLEAN P DECOMP Circ over shakers (contaminated cmt). 05:00 - 13:00 8.00 CLEAN P DECOMP PJSM. LD 4" DP. 13:00 - 14:00 1.00 CLEAN I P DECOMP LD BHA ~2. 14:00-18:00 4.00 TA P DECOMP RUWLunit. RIH wl EZSV and sst at 9,347'. POH, RDWL unit. 18:00 - 18:30 0.50 TA P DECOMP Pressure test tag to 3,500 psi for 30 min - okay. 18:30 - 19:00 0.50 TA P DECOMP Pull WB. 19:00 - 22:30 3.50 TA P DECOMP RU and mn 70its (2201.29') of used 3-1/2", 9.2 ppf, L-80, TDS tbg. 22:30 - 23:00 0.50 TA P DECOMP MU and land tbg hngr. screw in LD screws. 23:00-23:30 0.50 TA P DECOMP SetTWC, and test to 2,500 psi f/ below. 23:30 - 00:00 0.50 TA P DECOMP ND BOPs. 6/17/2001 00:00 - 04:00 4.00i BOPSUFP DECOMP Pull RAM blocks for inspection. 04:00 - 05:30 1.50 BOPSUF P DECOMP PJSM, ND BOPs. 05:30 - 07:00 1.50 WHSUR :~ DECOMP NU tree. 07:00 - 07:30 0.50 WHSUR P DECOMP Press. test tree to 5,000 psi - okay. 07:30 - 08:30 1.00 WHSUR P DECOMP RU, Pull TWC valve. 08:30 - 11:00 2.50 WHSUR P DECOMP RU Hot Oil, PJSM, pump 160 bbls diesel and freeze protect well. 11:00 - 11:30 0.50 WHSUR P DECOMP Install BPV, test to 2,500 psi - okay. 11:30 - 12:00 0.50 BOPSUF; P DECOMP Pull outside annular valve. 12:00 - 13:00 1.00 RIGD P DECOMP Secure cellar. 13:00,15:30 2.50 RIGD P DECOMP Clean Pits and Cuttings tank. RELEASE RIG: 15:30 bra, 6/17/2001. Move off of W-21 well to the comer of"iN" Pad for summer maintenance. 10/21/2001 12:00-00:00 12.00 MOB P PRE Moving rig from L Pad to W Ped. Rig off L Ped at 1900 hrs. Rig less than 1 mile from W Pad at 2359 hrs, 10/21/01. 10/22/2001 00:00 - 03:00 3.00 MOB P DECOMP Crib beneath rear tire. Hook up Cat to snub substructure. Pull rig back on roadway. 03:00 - 09:00 6.00 RIGU P DECOMP Complete rig move to W Pad. Spot rig over well. Put herculite around cellar. Spot pits, utellite camp, and shop. 09:00 - 12:00 3.00 RIGU P DECOMP Raise derrick and pin. Rig up floor. RIG ACCEPTED at 1200 hrs, 10/22/2001. 12:00-16:00 4.00 RIGU P DECOMP Take 400 bbls of 8.6 ppg ssawatar in pits. Rig up floor. Install double valves on annulus. Bridle down. Check pressure on OA & IA: 0 psi on both. Rig up circ lines to displace diesel. Test lines to 3500 psi, OK. Put DP in pipe shed. H2S drill ~ 1600 hrs. w/2 min. response. 16:00 - 17:30 1.50 PULL :~ DECOMP PJSM. RU DSM lubricator and pull BPV. RD DSM equipment. 17:30 - 20:30 3.00 PULL :~ DECOMP Pump down tbg and displace diesel with seawater. Pump 209 bbls at 2 bpm. Shut down and flow check, OK. Blow down and RD cim lines. 20:30 - 21:00 0.50 PULL P DECOMP Install TWC and pressure test below to 1000 psi for 10 min., OK. Recod on chart. 21:00 - 21:30 0.50 PULL P DECOMP Conduct safety and pre-spud meeting with crews and Co. rep. Review pre-spud oheck list. 21;30 - t30:00 2.50 PULL P DECOMP Che~ and bleed,` tree test ports. Drain tree below adapter flange.' Nipple Clown tree. Take elevation measurements to rig Printed: 11119/2001 10:05:44AM Legal ~ell ~ame: ~-~1 Common ~ell ~ame: ~-~1~ ~pud Date~ 3/2~/1 Event ~ame: REEnTER+COmPLETE ~a~: ~/S/2001 End~ 11/1~/2001 Contractor ~ame: ~BOR~ Rig Release~ 11/18/2001 Rig ~ame~ ~BOR~ SE~ Rig ~umber~ 10~001 21~ - 00~00 2.50 PULL P DECOMP ~r and ~ll~ad. Ins~ t~ banger threads-3 1~" 8 Rd. 10~3~001 00~ - ~ 4.00 PULL P DECOMP N~ BOPE ~00 - 05~ 1.~ PULL P DECOMP ~ DSM. Pull ~. ~ DSM 05~ - 10~ 5.00 PULL P DECOMP BOLDS. Pull Hanger & 70 Joints 3.5" Tubing. 10~00 - 15~30 5.~ ~HIP P W~IT ~U BOP Test ~uip. T~t BOPE 250 psi Low - 3~ psi High. Test w~nes~ by Je~ Jones, AO~CC. ~ Test ~uip. 15~30 - 16~30 1.00 ~HIP P W~IT Instil Wear Bushi~. BI~ d~ all lines. 16:30 - 19~ 2.50 ~IP P W~IT ~ B~ ~ 3:9 ~" Casing Milling ~sembly, DC's, Ja~ & ~P. 19~ - 00~ 5.~ ~HIP P W~IT P/U 4" DP singles ~om sh~ & ~IH. 10~4/2001 00~ - 02~30 2.50 CLaN P DECOMP P~ 4" DP ~om sb~ & ~IH. Tag ~IBP ~ 9351' DD. 02~30 - ~30 2.~ CLaN P DECOMP Pump Hi - ~s s~e~ 13 BPM ~ 2~0 psi. Pump pill, blow d~ top d~e. ~30 - 07~00 2.50 CLaN P DECOMP POH 15 s~nds, P/U add~ional ~ J~ ~om sh~, POH to ~'. 07~00 - 08~ 1.50 CLaN P DECOMP Cut & slip d~lling line. Se~i~ top d~e, blo~s & crown. ~30 - 12~ 3.50 CLaN P DEC~P POH. ~ Ja~. 12~00 - 12~30 0.50 CL~ P DECOMP Pressure test 9 ~8" ~sing to 3~0 psi ~or 30 minutes 12~30 - 13~ 0.50 ~HIP P W~IT PJ~M - Int~u~o~ m~Ung ~b Di~ a~ ~ew m. ~U Whi~t~ ~sy. 13~00 - 14~30 1.50 ~HIP P ~IT ~ ~i~to~ and Mill B~ 14~ - 16~00 1.50 ~HIP P ~IT ~IH w/all B~ & run,ion test ~D - OK 16~ - 21~30 5.50 ~HIP P W~IT RIH ~ 2 minut~ / s~nd ~ 9258'. 21~30 - 22~ 0.~ ~HIP 3 W~IT PJ~M on ~i~ Wbipst~, ~/O mud and Milling window. Also m~oir ~ on Kingak w/~o~ist, Co. ~ep, Dic D~r, ~ and all ~ 22~00 - 22~30 0.~ ~HIP P W~IT Cir~late and o~nt 22~30 - 23~30 1.~ ~HIP N ~EAL W~IT Unab~ to mad ~'s signals on ~puter. F~ glad. 23~30 - 00~ 0.~ ~HIP P W~IT O~nt ~t~ to 10~5~1 00~-~30 0.~ ~HIP P ~IT TagClBP~9351'.~tAn~or~b 15 K Pull up SK to ensum ~t Sla~ o~- Mil~ ~ ~s R~ht ~:30 - 01 :~ 1 .~ S~HIP P ~iT Disp~ ~11 ~ ~ 11.4 p~ M~. 01:~- 16:30 15.~ S~IP P ~IT Mill~nd~in 9 ~8'Caai~ ~m 9327'to 9357' ( 16R. ~ + 14 fl o~n ho~). Wo~ through wind~ without pumps - OK 16:30 - 17:30 1.~ S~HIP P W~IT Circ. Hi-~s S~p 17:30 - 18:00 0.~ S~HIP P W~IT Pe~o~ FIT. Pmasum ~0 psi w/11.4 p~ Mud = 12.~ E~ 18:~ - 18:30 0.~ S~HIP P W~IT MonRor ~11. Pump alug. BI~ dn TID. 18:30 - 23:00 4.50 S~HIP P W~IT POH wi 4' DP & ~DP. 23:00 - 00:00 1.~ S~HIP P ~IT ~ B~ 10126~1 00:00 - 02:00 2.~ 8~HIP = W~IT Gomplete ~ B~. Top mill - ~11 guage I 6 1~' OK. 02:00 - 03:00 1.~, S~HIP P W~IT C~ar Flor. ~ Je~ing aub on aingle and fluah BOP sta~. Fun~ion all roms. 03:~ - ~:00 3.~ DRILL P I~1 ~U B~ ~ 5. - 8 1~' ~1 B~. Adjust motor to 1.5 D~.& o~nt. P~ F~x ~'s & ja~. RIH one stand ~DP - teat ~D - OK RIH wi ~P. ~:~ - ~:~ 3.~ DRILL P INT1 RIH w 4' DP to 9226'. 09:~ - 10:~ 1.~ DRILL P INT1 Fill P~ & o~nt 70 d~. ~S. Slide through ~nd~ - no =mb~m. BHng pumps on again and waah to 9357'. , Printed: 11119/2001 10:05:,14AM 1. Type of Request: [] Abandon r'l Alter Casing [] Ch~.nge Approved Program [] Suspend [] Repair Well [] Operation Shutdown [] Plugging [] Time Extension [] Perforate [] Pull Tubing [] Variance [] Other [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface ,~ xj' ~' ' 626' SNL, 1180' WEL, SEC. 21, T11N, R12E, UM At top of productive interval 2279' NSL, 1355' EWL, SEC. 15, T11N, R12E, UM At effective depth 2843' NSL, 1864' EWL, SEC. 15, T11N, R12E, UM At total depth 2936' NSL, 1943' EWL, SEC. 15, T11N, R12E, UM 5. Type of well: lib Development I-! Exploratory ri Stratigraphic i-I Service 6. Datum Elevation (DF or KB) KBE = 90.90' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-21 9. Permii Number 189-032 10. APl Number 50-029-21929-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Casing Present well condition summary ~ Total depth: measured 11514 feet ..~ Plugs (measured) true vertical 9103 feet Effective depth: measured 11391 feet Junk (measured) Fish: Baker packer, 16' of 2-7/8" tubing and perf guns at true vertical 9085 feet 10329' Length Size Cemented MD TVD Structural Conductor 110' 20" 110' 110' Surface 2710' 13-3/8" 3840 cuft Coldset II and III 2710' 2708' Intermediate 10121' 9-5/8" 2122 cu ft Class 'G' 10121' 8804' Production Liner 1646' 5-1/2" 650 cu ft Class 'G' 9868' - 11514' 8685' - 9103' Perforation depth: measured 10825'-10830',10850'-10950',10975'-11140',11220'-11230' R E C E IV E D true vertical 9000'- 9001', 9004' - 9022', 9026'- 9049', 9060'- 9062' ~,~/ 2 2 200'~ Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 to 9862' Alaska 0il & Gas Cons. C0rnnlJss/0n Anchorage Packers and SSSV (type and measured depth) External casing packer at 10791'; 5-1/2" Baker packer at 10350'; 9-5/8" TIW packer at 9784'; 3-1/2" SSSV Landing Nipple at 2098' 13. Attachments ItU Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation May 31, 2001 16. If proposal was verbally approved Name of approver Date Approved 15. Status of.well classifications as: I~ Oil [] Gas [] Suspended Service contact Engineer Name/Number: Neil.~agee, 564-5119 Prepared By Name/Number: Terrie Hubble, 564-4628 17. '1 hereby certify that the fore/~Sing is true and correct to the best of my knowledge Signed Lowell Crane~ ~ Title Senior Drilling Engineer Date ~,. ~,[ ~ Conditions of Approval: Notify Commission so representative may1~tness ~-~5{~)I~) D.~ ~ ..~.t~ Approval No. ~(~1 ) ~ ~) Plug integrity - BOP Test _r~ Location clearance · · - Mechanical Integrity TeStoR~,NALU'~'[ [~_~ ' N AS'(~NED Subsequent formBy required 10-i'4~ ~"~ ~F'~~I Form 10-403 Rev. 06/15/88 ' I_~_ Submit Iff Tripli~,a · © © To: Tom Maunder - AOGCC Date: May 22, 2001 From: Neil Magee Subject: Reference: W-21 Application for Sundry Permit - P&A for Sidetrack Operations APl #50-029-21929 Sundry approval is requested to P & A the subject well in preparation for a pending sidetrack operation. W- 21 is currently shut-in and is incapable of producing due to a packer leak. The well is planned to be sidetracked to a new bottom hole location as a conventional horizontal producer targeting Zone 4 of the Ivishak formation. · Notify the field AOGCC representative with intent to plug and abandon. * Pre-Riq Work Outline W-21: 1. MIRU Slickline. Drift 3 W' tubing to packer depth @-9783' MD (58 deg inc). Refer to W-21A schematic. Note minimum restriction of 2.75". 2. Plug and abandon w! 13.8 ppg Class G cement. Pump cement volume to abandon perforation interval from top fish (2-7/8" cut tubing) at 10329' to the WLEG at 9862'. This will effectively fill 467' of the 5-1/2" casing annulus ~ 5~ ~"/(. ~ ~~ ~'~~'~ Note: Tubing will be subsequently jet cut at approximately 9768'. Note: The estimated pore pressure of the open perforations is 7.7 pg at 8800' TVD (3520 psi). 3. MIRU S/L. Drift/Tag TOC. Document top of cement per AOGCC requirements. An AOGCC representative may wish to witness the tag. 4. If TOC is found higher than planned jet cut, MIRU coil unit and clean up cement stringers. Pressure test plug and record on chart. 5. Test the McEvoy 9 5/8" paCk-off to 5000 psi and service lock down studs by backing out and re-torqueing one at a time. Test the tubing hanger pack-off to 5000 psi and service each LDS. Note: Do not test the 9 5/8" annulus. The production packer failed to test after the last rig workover in November 1990 and the well was subsequently shut in. Prior to running the completion the 9-5/8" annulus was tested to 3000 psi to a depth of 9897'. 6. MIRU E/L unit. RIH with jet cutter and sever 3 ~" tubing at -9768' MD. This is in the middle of the pup joint below GLM #1 handling pup. (See completion tally) Allow tubing/annulus to equalize. Circulate the well with seawater and freeze protect the IA and tubing. Note: The drilling rig will set a 7" CIBP and whipstock after removing the 3 ~" tubing above the cut. 7. Set a BPV in the tubing hanger. Secure well with 0 psi on tubing and annulus. 8. Remove the well hous flow lines. Level the pad and dig o~{~t~e cellar. Please provide total well preparation cost on the hand over form to the drilling rig representative. Ri.q Side-track Operati utline W-21A: . . . . . MIRU Nabors 7ES. Circulate out freeze protection and displace well to seawater. Ensure BPV is set. Nipple down tree. Nipple up and test BOPE. Pull and lay down 3 1/2" production tubing, SSSV nipple, control line and GLM's from E-line cut. Check for NORM and record on Morning Report. Replace 9-5/8" casing head pack off as required. PU 4" DP & collars. TIH w/8-1/2" watermelon mill assembly (without starter mill) and tag cut tubing stub at 9768'. Note the whipstock depth at +/-9750'MD is at 55 degrees inclination at an azimuth of 35 degrees and a TVDss of 8525'. The TJB Kingak Shale formation is opposite the proposed side-track depth. Set 9-5/8" CIBP on E-line at whipstock depth. (Note: 9-5/8" casing is 47 Ib/ft) Set per Baker recommended depth, for this size whipstock, to avoid milling casing collar). Pressure test 9 5/8" casing to 3500 psi. TIH with 9-5/8" Baker bottom-trip anchor whip-stock/mill assembly. Orient whip-stock to - 85 deg right of high side with MWD as required and set. Displace w/10.8 ppg LSND mud and begin milling window after hole has been fully displaced. POOH and lay down mill assembly. Run in hole w/directional drilling assembly. Drill 20' of formation & conduct FIT to 12.5 ppg. EMW. Kick-off and drill 8-1/2" borehole into the top of the Sag River formation at -8793' TVD and -10089' MD. Run MWD/GR. LSND mud @ 10.8 ppg. POOH. . Run and cement a 7", 26# L-80, intermediate drilling liner with 150' of lap to TD. Pump cement, drop DP wiper plug, and displace with mud. Hydraulic set liner hanger and liner packer, unsting and circulate cement from liner top. 8. Make up and RIH with a 6-1/8" bit and directional assembly. TIH to the landing collar. Test the 9 5/8", 7" liner from the landing collar to surface to 3500 psi for 30 minutes. . Drill out 20' & FIT to 9.5 ppg EMW. Displace w/Iow-density mud. Drill -5000' of 6-1/8" hole to TD at 15,111' MD. Run MWD/GR/RES/NEU real time LWD. Spot liner running pill in open hole and POOH. 10. Run 4 ~", 12.6# 13Cr solid production liner, w/150' of lap, to TD. Pump cement, drop wiper plug and displace with "perf pill" followed by mud. Hydraulic set liner hanger and top liner packer, unsting and circulate cement from liner top. 11. Test the 4-1/2", 7", and 9-5/8" casing from the landing collar to surface to 3500 psi for 30 minutes. Displace well to clean seawater above liner top. POOH laying down excess drillpipe. 12. Drill pipe convey 6spf, 2-7/8" guns -500', and perforate the production interval as determined by LWD/Geologic analysis. POOH w/DP. 13. Run WLEG, Profile Nipples, Packer, Profile Nipple, GLM's, 4 ~" 12.6#, 13Cr, New Vam tubing. See attached completion schematic for details. Space out tailpipe into the 4-1/2" liner top. Reverse circulate clean seawater w/corrosion inhibitor. 14. Drop ball/rod, pump into position to RHC plug, set packer (3500 psi) and test the tubing to 3500 psi. Bleed tubing pressure to 1500 psi. Test annulus to 3500 psi for 30 minutes. Bleed off tubing pressure and pressure up annulus to shear the RP valve in the top GLM. 15. Set TWC. ND BOPE & Nipple up and test tubing head adaptor & tree to 5000 psi. Pull TWC. 16. Displace annulus w/sufficient volume to freeze protect tubing & ~nulus to -2200' TVD. Allow fluids to U-tube into tubing. Install & test BPV. Secure well. 17. Rig down and move off. Attachments: . 2. 3, 4. Sundry Notice Application to P & A W-21A. Wellbore Schematic: Present Condition Wellbore Schematic: Proposed Condition APD Supporting Data (Drilling Program Information) THE MATERIAL UNDER THIS COVER HAS BEEN MICR OFILMED ON OR BEFOR OCTO.BER 24, 2000 Pl~ E W M A T E R IA L U N D ER THIS M A R K E II ]Il R ~.~ STATE OF ALASKA OIL AND GAS CONSERVATION ~SSlON REPORT OF SUNDRY WELL"OPERATIONS 1. Operations performed: Operation Shutd°wn .... stimulate Plugging ." Perforate_x_ PUll tubing x Other x Repair well Alter c, asing . 5;' Type'of Well: Development SlratigraPhic 2. Name of operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. ~ti~n of WelI at surface ..... 62~!iSNL, 1180' WEL, SEC. 21, TI 1N, R12E, UPM At,~p of productive interval 299~; NSL, 1348' EWL, SEC. 15, T11N, R12E, ~IPM At .effective depth 2435' SNL, 1856' EWL, SEC. 15, T11N, R12E, UPM At !~tal depth , 234~' SNL, 1936 EWL, SEC. 15, T11N, R12E, UPM · r i i , li111 i · i ii iiii i i i 12. Present well C°ndition summary Total depth: measured 11514feet Plugs (meesure~) true vertical 9103feet BKB 6. Datum elevation (DF or KB) ' KB,,~, =,,90,86 AMSL fget 7. Unit or Property name Prudhoe Bay Unit 8. Well number ' W-21 (23-1~.11-12) PBU 9. Permit number/~oval number 89-32 / 9O-77O 10. APl number 50- 029-2192~ i [ [ 11. Field/Pool Prudhoe 011Poel Effective depth: measured true vertical 11391 feet Junk (measured) Baker packer, 16' 2-7/8" tubing, peri. guns 9065feet ~ (~ 10341' Casing Structural ~Conductor ~Surface i?:ntermedlate 'Production "?Liner Perforation depth: ~r:! Length Size Cemented Measured depth True vertical depth BKB 147 147 2710 2708 10121 8804 110 20 2673 13 3/8 3840 c.f. 10084 9 5/8 2122 c.f. 1646 ~' 5 1/2 650 c.f. 9868-11514 measured Three open intervals: 10850'- 10950', 10975'- 11140', 11220'- 11230' 8685.9103 i' 3. true vertical subsea Three open intervals: 8913'- 8931', 8935'- 8958', 8969'- 8971' Tubing (size, grade, and measured depth) 3-1/2" 9.2 # L-80, out3-1/2" tailpipe to 9862' Packers and SSSV (type and measured depth) 9-5/8" TlW pa~er at 9784~ 3-1/2' SSS V at 2098' · External casing packer at 10791' stimulation or cement squeeze summary Idtervals treated (measured) Treatment description including volumes used and final pressure RECEIVED Alaska 0il & Gas Cons. Commission Anchorage Re.oreSentative Daily Average Production ar In!action Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure P~ior to well operation 290 1222 1200 1585 Tubing Pressure 273 SUbsequent to operation 110 335 954 1170 15. Attachments ~ I 16. Status 'of well classification as: C-~pies of Logs and Surveys run I Daily Report of Well Operations X I Oil X Gas , Suspended Service 17. I hereby certify that the for~lo[ng is true ancJ~orrect to the besi 'of my knowledge, ii Signed . . T~le, Sup.e~lsor Workover/Completlons Form 10-404 Rev 06/15/88 253 SUBMIT IN DUPLICATE Well W.21 Workover: Attachment I Accepted rig at 1900 hours on 10/15/90. RU WL and cut 3-1/2" tubing. Pulled and layed down 3-1/2" tubing. RIH with overshot to latch of 9-5/8" packer, would not release. Washed over 9.5/8" packer with mill. Recovered latch assembly. RIH with 4" spear and recovered packer at 9748'. Cleaned to 11,339'. Tested liner lap and 9-5/8" casing to 3000 psi, ok. RIH with drillpipe conveyed guns. Shot perforation interval 11,230' to 11,220' WLM. Packer stuck at 10,350' DPM. Cut 2-7/8" tubing at 9974' WLM. RIH and attempted to recover 2-7/8" cutoff and drillpipe conveyed gun assembly. Latched onto cutoff and attempted to jar fish loose. RIH with tubing cutter and cut tubing above packer at 10,329'. POH and lay down 2-7/8" tubing. Attempted to recover fish. Changed well over to filtered inhibited brine. RIH with 3-1/2" completion string. Tested tree to 5000 psi, ok. Set packer and tested tubing, OK. Pressure tested annulus to 2500 psi. Test failed. Installed BPV and secured well. Released rig at 1900 hours on 10/30/90. 15.0 Days. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs. Wednesday. October 31 1990 WELL: ,W-09 (41-32-11-12) Day: O Expense AFE Number: ,145037 Expense AFE Amount = PRUDHOE BAY UNIT Rig: Doyon Rig #16 Current Field Costs --- Estimated Final Cost = Current O0erati0n' Displacing well to seawater. Summa _ry of Last 24 Hours Accepted rig at 2100 hours on 10/30/90. Pulled BPV. Attempted to displace diesel from tubing and annulus. Pump heated seawater down tubing. Reviewed By: ~../4. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday. November 1. 1990 WELL: W-09 (41-32-I1-12~ Rig' Dovon Ria #16 Day: 1 'ExpenSe AFE Number: .Expense AFE AmOunt = 145037 Current Field Costs = Estimated Final Cost = Current ODerati0n: POH with cutter tool. Summary_ of Last 24 Hours RIH with 2-1/8" perf gun. Could not get pass 2280'. RIH with 2.5" swage to 1200'. RIH with 2.62' gauge ring to 12,173'. RIH with 2-1/8" guns. Could not get pass 2887'. RIH with chemical cutter to 12,072' and cut tubing. Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: As of 0600 Hrs....Friday. November 2, 1990 WELL: ..,W-09 (41-32-11,12) ,, , Day: 2 Expense AFE Number: 145037 Expense AFE Amount = Current Ooeration' RIH to recover slick stick. Summary_ of Last 24 Hours Rig' Doyon Rig #1{~ Current Field Costs = Estimated Final Cost = POH with tubing cutter. Changed well over to 8.5 ppg brine. ND tree and NU BOP's. Tested BOP's to 5000 psi, ok. Pulled 3-1/2" tubing. Reviewed By: ~.~. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. November 5. 1990 WELL: W-09, ~41-32-11-12) Rig: Dovon Rio #16 Day: 5 Expense AFE Number: Expense AFE Amount = 145O37 Current Field Costs = Estimated Final Cost = Current OPeration· POH with sPear and packer. Summary of Last 72 Hours Pulled and recovered 3-1/2" tubing. RIH with overshot and recovered slick stick. RIH with mill and PRT. Milled on packer. POH without packer. RIH with spear. Reviewed By: ~.~. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, November 6, 1990 WEb[,: W-09 {~41-32-1]-]2) Rig: poyon Rig #16 Day: 6 Expense AFE Number: Expense AFE Amount -- 145037 Current Field Costs = Estimated Final Cost = Current O0eration: RIH with 4-3/4" bit and 5-1/2" scraper. Summary_ of L~st 24 Hours Recovered 9-5/8" packer and tailpipe assembly. RIH with 8-1/2" bit and 9-5/8" scraper to liner top. PU 4-3/4" bit and 5-1/2" scraper. Reviewed By: i~. ~. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, NoVember 7. 1990 WELL: W-09 (41-32-11-12) Rig: Dovon Ria #16 Day: 7 Expense AFE Number: Expense AFE Amount = 145037 Current Field Costs = Estimated Final Cost = Current OperatiOn' RIH with 4-3/4" mill. Summary_ of Last 24 Hours RIH with 4-3/4" bit and 5-1/2" scraper to 15,111'. Pick up 4-3/4" mill. Reviewed By: F../-/. BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRI~DHOE BAY UNIT As of 0600 Hrs. Thursday, November 8. 1990 WELL: W-09 (41-32,-11-,,12) Rig: Dovon Rio #16 Day: 8 Expense AFE Number: 145037 Expense AFE Amount = _ , Current O.Deration' RIH with 5-1/2" scraper. Summary of Last 24 Hours RIH and mill junk to PBTD at 15,300'. POH. RIH with bit and scraper. Current Field Costs = Estimated Final Cost = Reviewed By: ~'~ BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHO.E BAY UNIT As of 0600 Hrs. F,,riday. November 9. ,,,1990 WELL: W-09 (41-32-11-12) Rig: Doyon Rig #16 'Day: ..9. Expense AFE Number: Expense AFE Amount = 145037 Current Field Costs = Estimated Final Cost = ,Current Operation;, Test 9-5/8" casing and liner lap. Summa _ry of Last 24 Hours RIH and spot LCM pill. Displace hole to filtered inhibited brine. POH. RIH with 7" test packer. Test 9-5/8" casing and 7" liner lap to 3000 psi. Reviewed By: BP EXPLORATION (ALASKA), INC. DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday. November 12. 1990 WELL: W-09 ,(41-~2-11-12), Rig: .Dovon Rig #16 Day: 12 Expense AFE Number: Expense AFE Amount = .145O37 Current Field Costs = Estimated Final Cost = Current Operation' Rig released at 2100 hours on 11/11/90. Summary of Last 72 Hours Test 9-5/8" casing and lap to 3000 psi. OK. Polish tieback sleeve. Ran gauge ring/junk basket. Ran 4-1/2" tubing, space out and land. Test contol line to 5000 psi. ND BOP. Nipple up and test tree to 5000 psi. Set XN plug. Set packer to 3000 psi. OK. Test annulus with 2500 psi. OK. Shear RP with 3100 psi. Displace annulus with 155 bbl diesel and "U" tube to the tubing. Set BPV. Release rig at 2100 hours on 11/11/90. · Reviewed By:~ BP EXPLORATION TO: DISTRIBUTION BP Exploration (Alaaka) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) $61-5111 Date: 02/06/91 T#:82037 FROM: SUBJECT: Information Control Well Records LR2-1 BP C.,ASED HOLE FINALS Enclosed is your copy of the material liSted below. If you have any questions, please contact BP Well Records at (907) 564-4445. G-02 CCL 10/22/90 #1 7250-7988 HLS 5" M-28 PRISM 01/28/91 #1 8500-8998 ATLAS 5" CHEMICAL CU'I-rER 09/28/90 ' #1 9434-9796 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519.6612 (907) 561.5111 TO: DISTRIBUTION Date: 10/31/90 T#:81623 FROM: SUBJECT: Information Control Well Records LR2-1 BP GASED HOLE FINAL~. Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. GR 10/23/90 #1 9500-9900 ATLAS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RECEIVED NOV 1 4 1990 BP EXPLORATION BP Exploration (Alaska) In~. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 10/31/90 T#:81620 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed .is your copy of the material listed below.' If you have any questions, please contact BP Well Records at (907) 564-444'5. - 0-38 PROD-F 10/12/90 - G-01 COLLAR ~ 10/13/90 - M-06 PROD-F 10/10/90 . N-13 PROD-F 10115/90 · W-08 PROD-F 10/14/90 ~,~ ~ TUBING CUTTER 10/26/90 . W-31 PROD-F 1.0/1 i/90 #1 #1 #1 #1 #1 #1 #1 10700-11135 CAMCO 9800-10149 CAMCO 9950-11587 CAMCO 9250-9755 CAMCO 13100-13330 CAMCO 10000-10312 ATLAS 11400-11842 CAMCO # Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR RECEIVED NOV 1 4 1990 Alaska ~)11 & 6ac Cone. Comm~ion Anohorage ME Alaska ~KA OIL AND GAS CONSEKVATION ~SSZON TO: Lou~.ie C. SI~[ DATE: November 8, 1990 Comm_~ss ~,oner .J FILE NO: ~. ~.,118.1 TELEPHONE NO: THRU: SUBJECT: BOPE/RIO ' [nspecCion BPX PBU W-21 Doyon R:I.s ~6 Prudhoe 0~1 Pool FROM: Doug Amos ~ PeCrolema tnspec.t'o~ Saturday Oct. 27,' 19.90: I .traveled chis date fro~ AAI's ~RU Co BPX pBU '~=21 t0 c°n'~[~ a'-~/RIO Inspection on Doyon RiS No. 16. Eo~d the ~ equip~nt ~d ~ r~rds' co be ~n c~liace. ~teetion equi~nt indica2ed"t~ it w~ o~d~ fox calibration. ~ht ~h~s ~o t~ 'attention of ~X r~rese~aciv~ Jerry Lorenzen and he' ass~ed ~ t~t. ~his p~ob.l~ ~ld b~ '~~d as soon as the gas v~les nee~d. Co ~.ltbra~e ~is sys~ arrived on the slo~. The gas v~les ~e-~e order~ ~d should ~r~ve-the 1st of Nov~er. In summary, I conducted a BOPE/RIG Inspection aC BPX PBU I~-21 well on Doyon Rig No. 16. 02-00lA (Rev. 6/89) 20/l]/~-EMO1.gM3 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard FO. Box 196612 Anchorage, Alaska 99519-6612 TO¸: FROM: DISTRIBUTION Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE. FINALS . Date :10/22/90 T#:81755 EncloSed is your copy of the material listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. Tubing Cutter Tubing Cutter 10/17/90 #1 9900-1'0096 Atlas 5" 10/16/90 #1 9432-9800 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP ~PLORATION BP Exploration (Alaska) Inr,. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 661..6111 TO: DISTRIBUTION Date: 10/26/90 T#:81615 FROM' SUBJECT: Information Control Well Records LR2-1 BP ,C.A~,,ED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-31 S-02 COLLAR 10/21/90 #1 9100-9511 ATLAS COLLAR ' 10/22/90 #1 10670-10928 ATLAS · TUBING CUTTER 10/23/90 # 1 9870-10006 ATLAS Distribution: ARCO ' CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES A OIL AND GAS CONSERVATION COMMI APPLICATION FOR SUNDRY APPROVALS , i i i 1. Type of Request: Abandon Suspend ~ Operalion Shutdown Re-enter euspanded well Alter casing Repair well Plugging. Time extension Stimulate X Change approved program Pull tubing x ' Variance Perforate. ~ Olher ~ 2. 'Name of Operator '" ...... 5. Type 0f Well~' ' ' 6. Datum elevation (DF or KB) BP ExPloration,(,Alaska) Inc. Development x KBE- 90.88 AMSL feet Exploratory.. 3. Address Slratigraphic 7. U~lit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612. ,1 Servioe~ Prudhoe Bay Unit ' ~t.' Locat'i0n' of well at surface ....... 8. Well number 626'SNL, 1180°WEL, SEC. 21, T11N, R12E, UPM W-21 (28-15.11-12) PBU At top of productive interval 9. Permit numbei" 2998' NSL, 1348' NWL, SEC. 15, T11N, R12E, UPM 89-32 At effective depth 10. APl number 2435' SNL, 1856' NWL, SEC. 15, T11N, R12E, UPM 50- 029-21929 At total depth 11. Field/Pool 2342' SNL, 1936' NWL, SEC. 15, T11N, R12E, UPM Prudhoe Oil Pool '12. present ~w~l'i c0ndi~ion' summary ........ Total depth: measured 11514 feet Plugs (measured) true vertical BKB 9103 feet Effective depth: measured 11391 feet Junk (measured) true vertical BKB 9085 feet Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20 147 147 Surface 2673 13 3/8 3840 c.f. 2710 2708 Intermediate 10084 9 5/8 2122 c.f. 10121 8804 Production -- Liner 1646 5 1/2 650 c.f. 9868-11514 8665-9103 Perforation depth: measured 10850' - 10950; 10975' - 11140' true vertical subsea RECEIVED 8913'-8958' (two intervals) Tubing (size, grade, and measured depth) 3 1/2" L-80 to 9757' with 3 1/2" tailpipe to g872' OCT 0 ~ Packers and SSSV (type and measured depth) g 5/8" TlWpacker at g757~ $1/2" SSSVat 2/~. 8-.J~..OjJ & ~a$ C0118, 19, Attachments Description sommary of proposal' x Detailed operations pro, ram BOP sketch '"1~4. 'Estimated date for commencing operation ~5. Status of well classification as: September/October ~ ~90 'i 6. If proposal was verbally approved ' ' Oil X Gas __ Suspended Name of approver Date approved Service h reb ., rt that fPr oiog is tro .aa, corr to th; of my k%w ;dge. ' .... FOR ,COMMISSION USE ONLY C0~ditions of approval: Notify Commission s° representative may witness .... I Approval No. Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~-ot.I- Approved by order of the Commission- . Commissioner Date JOjI Form 10-403 Rev 06/15/88 nRIRINAL sIGNED BY A ....... ., ,-, .... SUBMIT IJ I TI~IPLICATE Approved Copy © . 2. 3. 4. 5. 6. 7. 8. . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Attachment I W,21 Workover Outline Procedure: MIRU workover rig. Pull BPV. Circulate diesel out. Install two-way check valve. ND tree. NU and test BOP's to 5000 psi. Pull 3-1/2" tubing string. Test the 9-5/8" packoff and replace if necessary. RIH with mill and PRT and recover the 9-5/8" Packer and tailpipe assembly. RIH with 6" bit and 7" casing scraper to PBTD. RIH with 7" Test Packer and test 9-5/8" casing and 7" liner lap. Shoot squeeze perforations in channel. Set cement retainer on drill pipe immediately above squeeze perforations. Cement squeeze with Class G cement. Drill out cement to top of retainer and test. Re-squeeze if necessary. RIH with 9-5/8" casing scraper to 7" liner top. Reverse circulate hole clean. RIH with 6" bit and 7" casing scraper to PBTD. Reverse circulate hole clean and change over to filtered brine. RIH with drill pipe-conveyed perforating assembly, log into position with GR/CCL. Perforate and flow well to surface. RIH and perform bullhead acid wash. Perform a hydraulic fracture treatment. RIH with 6" bit and 7" scraper to sand top. Reverse circulate and change over to filtered inhibited brine. Run 8.5" gauge ring/junk basket to 7" liner top. Run 4-1/2" tubing completion. Set and test the 9-5/8" packer. Set two-way check valve. ND BOP's. NU and test tree to 5000 psi. Pull two-way check valve. Shear valve in the G~LM and displace annulus to 140 bbls diesel. U-tube diesel to the tubing.' Set BPV. Release rig. BOP STACK CONFIGURATION ATTACHMENT II 13 5/8", 5000 PSI WP TRI PLE RAM STACK WORKO VER RISER I I,, ANNULAR PREVENTER 2" KILL LINE MANUAL HYDRAULIC GATE GATE PI PE RAMS I I ",J PI PE RAMS RECEIVED OCT 0 ~ !990 .Oil & Gas Cons. DRILLING SPOOL 4" CHOKE LINE HYDRAULIC MANUAL BLIND RAMS I , I ,i GATE GATE BP EXPLORATION BP ~xploration (Alaska) Inc, 900 East flenson Boulevarcl P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 06/29/90 T#:81321 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have'any questions, please contact BP Well Records at (907) 564-4445. A-10 CCL 06/23190 #1 8900-10384 SCH A-10 PERF 06~23~90 #1 9050-10100 SCH A-31 F~I~,F 06/21/90 #1 9450-9723 SCH F-26 PREF 06/21/90 #1 10250-10525 SCH H-21 PERF 06~25/90 #~ -9200-9750 SCH 'vV-17 TEMP 06/23190 #1 11338-11806 SCH :W~2~1 PROD LOG 06/22/90 ' #1 10600-11230 SCH W~.21 TDT-P BORAX 06/24/90 #1 10580-10250 SCH -W-27 CNL 06~24~90 #1 10760-11640 SCH Z-01 PERF 06~22~90 #1 10410-10756 SCH # 5" 5" 5" 5" 5~ Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES Alaska Oil & Gas Cons. Anchoraga BP EXPLORATION December 28, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Gentlemen: Well 'W~21'' (23-15-11-12) PBU Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. J. A. Bragg Manager Production Engineering JAB:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIVED 0,.:' .~,. ,.. .Oil.& Cms Cons. Commis~io~ '~ ~nch0ra~ REPORT OF SUNDRY WELL OPERAT measured true vertical Stimulate X Plugging...._ Alter casing Repair well r5. Type of Well: Development X Exploratory , Stratlgraphlc 11514 feet BKB 9103feet i. Ope~ations performed: Operation shbtdown Pull tubing 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519.6612 4. Location of well at surface 626' SNL, 1180' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2998' NSL, 1348' EWL, SEC. 15, T11N, R12E, UPM At effective depth 2435' SNL, 1856'EWL, SEC. 15, T11N, R12E, UPM At total depth 2342'SNL, 1936'EWL, SEC. 15, T11N, R12E, UPM 12. Present well condition summary Total depth: Perforate Other 6. Datum elevation (DF or KB) KBE - 90.86 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-21 (23.,15.11-12) PBU 9. Permit number/approval number 89.32 / 9.840 10. APl number 50- 029.21929 1 i, Field/Pool Prudhoe 011 Pool Plugs (measured) Effective depth: measured true vertical 11391 feet BKB 9085feet Junk (measured) Casing Length Structural -- Conductor 110 Surface 2673 Intermediate 10084 Production -- Liner 1646 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 147 147 13 3/8 3840 c.f. 2710 2708 9 5/8 2122 c.f. 10121 8804 5 1/2 650 c. fo 10850'. 10950; 10975'- 11140' 9868-11514 8685-9103 true vertical subsea 8913'.8958' (two intervals) Tubing (size, grade, and measured depth) 3 1/2" L-80 to 9757' with 3 1/2" tallpipe to 9872' Packers and SSSV (type and measured depth) i 3. Stimulation or cement squeeze summary see attachment 14. 9 5/8" TlW. packer at 9757~ 3 1/2" S$$V at 2104' RECEmV n Intervals treated (measured) JAH 0 Treatment description including volumes used and final pressure -/~;~$J~ 0J~.& Gas Cons. C0m~j$$j0~ ' ~ Anch0ra~ Representative Daily Average Production or Inlection Data OiI-Bbl Gas-Md Water-Bbl 'Casing Pressure Tubing Pressure Prior to well operation 450 78 586 1462 Subsequent to operation 250 1820 2002 1498 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I I Daily Report of Well Operations X Oil X Gas Suspended . Service__ I ~. ,hereby Ce~-)ti~ ef~t~oregf~ng is true and correct to the bes[~of'my kno~edge. Isianod ~~--~~~/! . ~./f.,,,'8"ltle/ ManagerProductionEngineering Form 10-404 Rev 08/15/88 242 3O4 · SUBMIT IN !XIP~ATE WELL W.2! (23.1S.11.1~ PBU ~TIMULATION OPERATIONS A half-strength mud acid perforation wash was performed October 8, 1989, on the following perforated intervals in Well W-21. 10850' - 10950'MD BICB 10975'- !ll40'MD BKB The mud acid treatment was pumped via coiled tubing as follows: a) b) c) d) e) f) g) h) i) j) k) 1) m) n) 62 bbls. Arctic diesel preflush 25 bbls. 10% HCI 10 bbls. diverter 25 bbls. 10% HCI 10 bbls. diverter 25 bbls. 10% HCI 10 bbls. diverter 50 bbls. 10% HCI 10 bb!s. diverter 101 bbls. 10% HCI 5'/8 bbls. 6% HCI - 1.5% HF 5'/1 bbls. 2% NH4CI brine 93 bbls. diesel w/xylene Displaced from coiled tubing with 45 bbls. diesel The well was returned to production slowly immediately following the acid treatment, then tested. jm 12/21/89 RECEIVED !JAN 0 ~ ~..".:-~,,- ~i<~ oil & Gas Cons. Commis~Jo~ Anchor,'3 BP EXPLORATION September 18, 1989 BP Exploration (Alaska) Inc. '900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: We]] ,W-21 (23-15-11-12) PBU Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, Manager Production Engineering JAM: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OF ALASKA COMMieN ~KA OIL AND GAS CONSERVATION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon . Suspend .. Alter casing Repair wail' Change approved program 2. Name of Operator ' BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Locati°n of Well at Surface .... 626' SNL, 1180' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 2998' NSL, 1348' EWL, SEG. 15, T11N, R12E, UPM At effective depth 2435'SNL, 18~6' EWL, SEC. 15, T11N, R12E, UPM At total depth 2342' SNL, 1936'EWL, SEC. 15, T11N, R12E, UPM 12. Present Well COndition summary Total depth: measured 11514 feet Plugs (measured) true vertical BKB 9103 feet operation Shutdown Plugging Pull tubing . . Variance 5' Type of Well: Development x Exploratory Stratigraphic . Service Re-enter 8uopended well Time exten~ion Stimulate X Perforate Ol~er 6. Datum elevation (DF or KB) KBE . 90.86 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-21 (23.15.11-12) PBU 9. Permit number 89-32 10. APl number 50- 029.21929 11. Field/PCOl Prudhoe 011 Pool Effective depth: measured 11391 feet true vertical BKB 9085 feet Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20 Surface 2673 13 3/8 3840 c.f. Intermediate 10084 9 5/8 2122 c.f. Production -- Liner 1646 5 1/2 650 c.f. Perforation depth: measured 10850'- 10950', 10975'- 11140' Measured depth True vertical depth BKB 147 147 2710 2708 1O121 88O4 9868-11514 8685-9103 true vertical subsea 8913'-8958' (two intervals) RECEIVED SEPI9L 9 Tubing (size, grade, and measured depth) 3 1/2" L-80 to 9757' with 3 1/2" tailpipe to 9872' Ala Oil.& Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 9757'; 3 I/2" $$$V at 2104' 13, Attachments ' 'Description summary of Proposal .x Detailed operations program BOP sketch 14. Estimated date for commenCing Operation I 15. Status of well classification as: September/October 1989 16, If prOPosal was verbally apprOved Oil X Gas Name of approver Date approved Service 17.1herebyce~oing is true and correct to the best of my knowledge. . Si~ned /~:~~l,t~~ ~ ~ _ Title Manager Production Engineering '/ ' ~' . FOR COMMISSION USE ONLY C°nditidns of approval: Notify Commission so representative may witness Plug integrity. BOP Test Location clearance Mechanical Integrity Test Su'-----~equent form required 10- ~/-+' ORIGINAL SIGNED BY Approved by order of the Commission , n~dl~ ~ .qMITH FOrm 10-403 Rev 06/15/88 Suspended lap. Approved Copy Retur n~d - ~omm~k~T'~ Date WELL W.21 (23.1g-11.12~ .. STIMULATION PROPOSAL A half-strength mud acid perforation wash is proposed for the following perforated intervals in Well W-21. 10850' - 10950' MD BKB 10975' - 11140' MD BKB The mud acid treatment will be pumped via coiled tubing as follows: a) b) c) d) e) f) g) h) i) j) k) l) 60 bbls. Arctic diesel preflush 25 bbls. 10% HC1 10 bbls. diverter 25 bbls. 10% HC1 10 bbls. diverter 25 bbls. 10% HCI 10 bbls. diverter 50 bbls. 10% HC1 10 bbls. diverter 50 bbls. 10% HCI 10 bbls. diverter 63 bbls. 10% HC1 m ) 595 bbls. 6% HC1 - 1.5% HF n ) 595 bbls. 2% NH4CI brine o) 100 bbls. diesel w/xylene p) Displace from coiled tubing with diesel Thc well will be returned to production slowly immediately following the acid treatment, then tested. jm 9/15/89 RECEIVED SEP 191989 Nas~ Oil & Gas Cons. c, ommissw ~chorage Coiled Tubing Blow*Out*Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2' Chicksan (Kill Line) Slips ~'~' ~'~C E I V E D s;P 1 ~1989 Pump-In SAI~ka Oil & ~s Cons. Commission: . Anchorage (Circulate/IReturns~ W ell Head Swab Valve TO: BP EXPLORATION HOUSTON .ARCO CHEVRON EXXON TEXACO MOBIL ARCHIVES BP Exploration (Alaska) Inc. 900 East Benson Boulevard F~. Box ~96512 Anchorage, Alask~ 99519-6612 (9oD 56~-5~ DATE: 25-JUL-89 T#: 80203 BP FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office GC1-E Static Gradient 08-JUL-89 Camco -E-26 Static Gradient il-JUL-89 Camco M-18 Static Gradient il-JUL-89 Camco' Q-04 Static Gradient 08-JUL-89 Camco ~21 Flowing Gradient 0.4-JUL-89 Camco ~Y-21 Static Gradient 07-JUL-89 Camco Z-08 Flowing Gradient 10-JUL-89 Camco 'Z-24 Static Gradient 10-JUL-89 Camco Received: Date: Information Control Well Records LR 2-1 J. Dietz/$. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 195612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL' PHILLIPS GEOSCIENCES RESERVOIR ARCHIVES BP CASED HOLE FINAL LOGS The following material is being Submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-02 PROD-F 04-JUL-89 #1 11100-114B4 CAMCO 5" A-OB INJ 0g--JUL-89 {1 9400-9840 CAMCO 5" C-17 GR / CCL 05-JUL-89 %1 10690-11550 CAMCO E-18 PROD-F 05-JUL-89 ~1 10900-11155 CAMCO i!iW~ii~ GAS LIFT 04-JUL-89 ~1 2700-10000 CAMCO 5" GAS LIFT 10-JUL-89 %1 2200-11620 CAMCO Received: Date-. Information Control Well Records LR2-1 J. Dietz/S. McCurry PERIOD OF CONFIDENTIALITY RELEASE DATE .~./~...~/~ COMMENTS B.RPC.02 (05/89) ALA ~"' ~iLSK~ STATE OF ALASKA ' ~t- ~ '~ AND GAS CONSERVATION ~MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS 1:3 SUSPENDED r'l ABANDONED [] SERVICE [] , ,, 2. 'Name of Operator 7. Permit Number BP Exploration 89-32 3. Address B. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 so- 029-21929 4, Locatioh of well at surface 9. Unit or Lease Name 626' SNL, 1180' WEL, SEC. 21, T11N, R12E ~-. Prudhoe Bay Unit At Top Producing Interval I'OC'A~I t0. Well NUmber , v~F~t w.21 (23.1s.11.12) 2998'SNL, 3931' WEL, SEC. 15, T11N, R12E .~e~f._/3,'~, i 11. Field and Pool At Total Depth :1,1~,(~. ~ ' Prudhoe Bay Field/Prudhoe Bay Pool 2342' SNL, 3343' WEL, SEC. 15, T11N, R12E~_ . 5: Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 90.86' I AD,L 28263 12:' Date SpUdded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depttt, II ollshore 116. No. ol Completions 03/25/89 04/14/89 04/24/89I N/AfeetMSL lOne 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional SUrvey 120. Depth where SSSV set 121. Thk=knass of Permafrost 11514' MD / 9103' TVD 11391' MD / 9085' TVD YES [] NO []I 2104feet MD I 1872' 22. TyPe EleCtric or Other LOgs Run EWR/GR, FDC.Poro, MWD GR/RES Plus Directional (MD + TVD) . 23. CASING, LINER AND CEMENTIN3 RECOFID SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE ~ RECORD AMOUNT PULLED i , 20~ Conductor Surface 110' 13-3/.8" 68# L,80 Surface 27!q' . !7-1/2" 384.0 cuft Cold Set II & III 9-5/8" 47# NT80S ' Surface 10121' 12-1/4" 2122 Cu ft Class G 5-1/2" 17# L-80 9868' 11514' 8-1/2" 650 cufl Class G , , , , 24. Pertorations open to Production (MD+TVD of TOP and Bottom and zS. TUBING RECORD interval, size and number) SIZE DEPTH SET {MD) PACKER SET {MD) Schlumberger 3-3/8" ~ 6 spf 3-'1/~" 9.2# 9872' 9757' '"' L-80 w/tailpipe 10850' - 10950' 8913' ~ 8931' DEPTM INTERVAL (MD) AMOUNT & K!ND OF...MAT. ERIAL USED 10975' - 11140' 8935' - 8958' 13-3/8" X 9-5/8" Freeze Protected Annulus w/175 BBLS Dry Crude, . , , 27. PRODUCTION TEST - , Date First Production.'~ IMethod of Operation (Flowing~ gas lift, etc.) ' April 21, 1989 I Flowing Date of Test Hours' Tested PRODUCTION FOR OIL-BBL ~,S-MCF WATER-BBL CHOKES~ RATIO IGAS..OIL : .: TESTPERIOD I~ Flow Tubing' ' Casing'Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Br'ief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or waler. Submit core chipS. REEEIVED 'JUN 0 7 ]989 Alaska Oil & Gas Cons. Commission Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate BP EXi~ORATION Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit March 27, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: Current Operation: 0600 Depth: 0 Day: 3 72- Hour Ftg: 0 Drilling 17-1/2" hole at 1950'. · Accepted rig'at 000I hrs 3-25-89. Spud well 1200 hrs. on 3-25-89. Drilled 17-I/2" hole to TD of 1950', Mud Type: SURVEy. WT: VIS: PV: YP: FL: ANGLE DIRECTION TVD SECTION Solids: Temp: W COORDINATES DLS RECEIV 'D :JUN 0 7 Maska Oil & Gas Cons. Commission Anchorage © O ; Rig: Audi #3 Well' W-21 (23-15-11-12) Daily Drilling Report.-- Prudhoe Bay Unit March 28, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: Current Operation: 0600 Depth: 2720' Day: 4 24- Hour Ftg: 770' Waiting on cement. Ran and cemented 13-3/8" casing to TD of 2710'. Mud Type: SPUD SURVEY MD.. WT: 9.3 VIS' 106 PV: 20 YP: 40 FL: ANGLE DIRECTION TVD SECTION Solids: Temp: °F COORDINATES DLS BP EXPLOR~'iON .-~g: Audi #3 ~!ell: W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit March 29, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 2720' Day: 5 24- Hour Ftg; 0 ~urrent Operation: Drilling out float equipment on 13-3/8". WOC. Test BOP's. Tag float collar at 2667'. Mud Type: LSND WT: 9.5 VIS: 35 PV: 9 ANGLE DIRECTION TVD YP: 9 FL: 12.0 ECT ON Solids: 6 Temp: 63 ~F COORDINATES DLS © © BP EXIq. OR~N Daily Drilling Report -- Prudhoe Bay Unit March 30, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 A_gE Amount: Current Amount: 0600 Depth: 4500' Day: 6 24-.Hour Ftg: 1780' Current Operation: Tripping. Drilled out 13-3/8" casing and ran FIT to .7 psi/ft. Drilled to 4500'. Mud Type: LSND WT: 9.5 VIS: 37 PV: 8 SURVEY MD' ANGLE DIRECTION TVD YP: 8 FL: 13.8 SECTION Solids: 7 Temp: COORDINATES 67 ~F DLS BP EXPI. OR~N Daily Drilling Report -- Prudhoe Bay Unit March 31, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12). l AFE # 120896 API: 50-029-21929 0600 Depth: 5314' Day: 7 24- Hour Ftg: 814' AFE Amount: Current Amount: Current Operation: TIH. Kickoff @ 4500'. Drilled 12-1/4" hole to 5314'. POOH. .Mud Type: SURVEY WT: VIS: PV: YP: FL: ANGLE DIRECTION ~ SECTION Solids:. Temp: COORDINATES ?.ig: Audi #3 3/e11:W-21 (23-15-11-12) Daily Drilling Report-- Prudhoe Bay Unit April 3, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 7340' Day: 10 72- Hour Ftg: 2026' gm'rent Operation: Drilling. Drilled 12-1/4" hole to 7340'. Mud Type: LIG SURVEY WT: 9.8 VIS:38 PV: 14 ANGLE DIRECTION ~ YP: 10 FL: 5.8 SECTION Solids: 9 Temp: 79 °F COORDINATES DLS BP E~q. ORA~ON Daily Drilling Report -- Prudhoe Bay Unit April 4, 1989 at 0600 hrs ?dg: Audi #3 :.Veil: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 8130' Day.: 11 24- Hour Ftg: 790' Eurrent Operation: ~ud Type: LIG ~U~VEY Drilling. Drilled 12-1/4" hole to 8130'. WT: 9.8 VIS: 37 PV: 11 ANGLE DIRECTION TVD YP: 7 FL: 5.4 SECTION Solids: 9 Temp: 85 °F COORDINATES DLS BP EXPLOR/i~I~N Daily Drilling Report -- Prudhoe Bay Unit April 5, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12). A_FE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 8800' Day: 12 24- Hour Ftg: 670' Current Operation: Drilling. Drilled 12-1/4" hole to 8800'. Mud Type: LIGNO WT: 9.9 VIS: 36 PV: 12 SURVEY MD ANGLE DIRECTION TVD YP: 8 FL: 5.4 SECTION Solids: 10 Temp: 87 °F COORDINATES DLS BP E~ORJq'~N 'ig: Audi #3 ./elh W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit April 6, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 2un'ent Operation: 0600 Depth: 9293' Day: 13 24- Hour Ftg: 493' POOH for motor. Drilled 12-1/4" hole to 9293'. ,iud Type: LIGNO WT: 9.9 VIS: 36 PV: 11 ANGLE DIREC'~ON TVD YP: 8 FL: 5.2 Solids: 10 Temp: COORDINATES BP EXIN..,OR~N Rig: Audi #3 Well: W-21 (23-15-11-12) © Daily Drilling Report -- Prudhoe Bay Unit April 7, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 9496' Day: 14 24- Hour Ftg:. 203' Current Operation: POOH with motor. POOH. PU motor and TIH. Began building angle for 2nd-ldckoff. Drilled to 9496'. Mud Type: LIGNO WT: 10.0 VIS: 37 PV: 14 YP: 9 FL: 4.8 Solids: 11 Temp: SURVEY MD ANGLE DIRECTION ~ SECTION (~OORDINATES . 97 'F DLS © © Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit April 10, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 10121' Day: 17 72- Hour Ftg: 625' Current Operation: ; · Mud Type: LIGNO PU BHA. Drilled 12-1/4" hole to 97//I/'. Ran and cemented 9-///8" casing. ND starting head. Set slips. NU starting head. Test BOP's. WT: 10.0 VIS: 38 PV: 15 YP: 11 FL: 4.8 Solids: 11 Temp: ANGLE DIRECTION TVD ~ COORDINATES 82oF BP EXPLOFI~ION Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report-- Prudhoe Bay Unit April 11, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 10255' Day: 18 24- Hour Ftg:134' Current Operation: Drilling 8-1/2" hole. Test casing to 3000 lbs. Drilled 124'. Mud Type: LIGNO WT: 10 SURVEY MD ANGLE VIS: 40 PV: 18 DIRECTION __ YP: 12 FL: 6 SECTION Solids: 11 Tcmp: 85 °F COORDINATES ~DLS Daily Drilling Report -- Prudhoe Bay Unit April 12, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 10480' Day: 19 24- Hour Ftg:22:5' Current Operation: Drilling 8-1/2" hole. Drilled 8-1/2" hole 225'. Mud Type: LIGNO WT: 10 ~ MD ANGLE VIS: 40 PV: 14 DIRECTION TVD YP: 8 FL: 6.2 SECTION Solids: 11 Temp: ~F COORDINATES DLS © © BP Daily Drilling Report -- Prudhoe Bay Unit April 13, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: Current Operation: 0600 Depth: 10612' Day: 20 24- Hour Ftg: 132' Drilling 8-1/2" hole. Drilled and surveyed to 10612'. Logged 10505'- 10530'. Mud Type: LIGNO SURVEY MD, WT: 10 VIS: 39 PV: 14 YP: 8 FL: 5.8 ANGLE DIRECTION TVD SECTION Solids: 10 Temp: 100~F COORDINATES DLS © © Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit April 14, 1989 at 0600 hrs AFE # 12O896 API: 50-029-21929 AFE Amount: Current Amount: Current Operation: 0600 Depth: 10948' Day: 21 24- Hour Ftg: 336' Tripping pipe. Drilled and surveyed. Drilled 8-1/2" hole to 10948' MD. Mud Type: LIG WT: 10 VIS: 39 PV: 16 YP: 7 FL: 5.6 ANGLE DIRECTION TVD ~ Solids: 10 Temp: ~F COORDINATES DLS BP EXPLOR~N © Daily Drilling Report-- Prudhoe Bay Unit April 17, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: Current Operation: 0600 Depth: 11514' Day: 24 72- Hour Ftg: 0 Testing BOP's. Drilled 8-1/2"' hole to TD. Ran and cemented 5-1/2" liner. Mud Type: LIGNO SURVEY MD 42 11472 WT: 10 VIS:41 PV: 16 YP: 11 FL: 5.4 ANGLE DIRECTION TVD ~ 81.6 N40.3E 9094 4707 Solids: 11 Temp: ~F COORDINATES DLS N3488 E3161 .... BP I~(FI.OR,KIION Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report .- Prudhoe Bay Unit April 18, 1989 at 0600 bra APE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 11514' Day: 25 24- Hour Ftg: 0 Current Operation: Drilling cement. Drilled cement to TOL @ 9868' w/8-1/2" bit. Tested 5-1/2" liner top to 3000 psi. - OK. Drilled cement from 9868' - 11170'. Mud Type: WT: 9.8 VIS:55 PV:27 YP: 13 FL: 9.8 8olids: 9 Temp: SURVEY MD, ANGLE DIRECTION TVD ~ COORDINATES Daily Drilling Report-- Prudhoe Bay April 19, 1989 at 0600 hrs Unit Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 11514' Day: 26 24- Hour Ftg: 0 Current Operation: Swapping mud w/9.6 ppg brine. Cleaned out liner to float collar. Tested csg to 3000 psi. Displaced well to filtered brine. Mud Type: SURVEY WT: 9.8 VIS: 20 PV: 20 ANGLE IpIRECTION TVD YP: 11 FL: 10.2 Solids: 9 Temp: COORDINATES DLS · © BP EXPLOR/Q'ION Daily Drilling Report-- Prudhoe Bay Unit April 20, 1989 at 0600 hrs Rig: Audi #3 Well: W-21 (23-15-11-12) AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 11514' Day: 27 24- Hour Ftg: 0 Current Operation: RU Schlumberger. Displaced hole to 9.6 ppg brine. Tested casing to 3000 psi. - OK. TIH w/drillpipe conveyed logs. Mud Type: BRINE WT: 9.6 VIS: PV: YP: FL: Solids: Temp: ANGLE DIRECTION TVD ~.~ COORDINATES BP EXPLORKIION Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report -- Prudhoe Bay Unit April 21, 1989 at 0600 hrs AFE # 120896 API: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 11514' Day: 28 24- Hour Ftg:0 Current Operation: 'IIH w/perf guns. Ran drillpipe conveyed logs. Ran gyro. RU and ran perf guns. Mud Type: BRINE WT: 9.6 VIS: PV: YP: FL: ~ MD ANGLE D1RECTIQ~q TVD ~ Solids: Tcmp: COORDINATES .© © Rig: Audi #3 Well: W-21 (23-15-11-12) Daily Drilling Report-- Prudhoe Bay Unit April 24, 1989 at 0600 hrs AFE # 120896 APl: 50-029-21929 AFE Amount: Current Amount: 0600 Depth: 11514' Day: 31 72- Hour Ftg: 0 Current Operation: Rigging down rig. Set packer. Cleaned pits. Perforated well. Ran 3-1/2" tubing.~,.~ ND BOP'~. NU tree.-4~ ~--.~7-- Mud Type: BRINE WT: 9.3 VIS: PV: YP: FL: Solids: Temp: °F ANGLE DIRECTION TVD SECTION COORDINATES DLS Teleco Oilfield S*~ 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 April 28, 1989 of Alaska Inc. JOB. #691 BP EXPLORATION (ALASKA) INC. WELL: W-21 PRUDHOE BAY - EILEEN WEST END RIG: AUDI #3 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of'our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures REEEIVED 0 7 B89 Alaska Oil & Gas Cons. Commission Anchorage A ~I~IAT COMPANY TELECO OILFIELD SERVICES JOB 691 SURVEY CALCULATIONS Date 04/17/89 Page 1 ."ompany: BP EXPLORATION ~ell: W-21 Location: PRUDHOE BAY E.W. E. Rig: AUDI # 3 PELECO Job # 6.91 TAK ~rid Correction: ~agnetic Declination: ~otal Correction: ?roposed Direction: 0.00 degrees 30.80 degrees 30.80 degrees 42.75 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' TIE IN TO GYRO SINGLE SHOT 2680.00 0.7 133.0 S 47 00 E 2677.08 59.44 0.90N 86.58E 86.58 N 89.405E 0.000 TELECO MWD SURVEYS 4159.00 0.2 61.4 N 61 24 E 4156.04 59.53 0.28N 87.39E 87.39 N 89.812E 0.044 4456.00 0.3 330.0 N 30 00 W 4453.03 60.57 1.40N 87.71E 87.72 N 89.080E 0.123 4690.00 4.6 22.4 N 22 24 E 4686.76 67.21 ll.04N 87.07E 87.77 N 82.772E 1.890 3678.00 0.3 105.7 S 74 18 E 3675.04 57.98 0.05N 85.36E 85.36 N 89.962E 0.139 3177.00 0.4 299.0 N 61 00 W 3174.05 56.03 1.86S 84.57E 84.59 S 88.736E 0.230 TELECO Job # 691 TAK 04/17/89 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' 4878.00 9.0 34.7 N 34 42 E 4873e40 88.74 30.55N 97.69E 102.35 N 72.632E 2.452 5067.00 13.9 35.7 N 35 42 E 5058.58 125.93 61.20N 119.31E 134.09 N 62.843E 2.595 5251.00 18.6 33.6 N 33 36 E 5235.18 176.88 103.54N 148.57E 181.09 N 55.126E 2.574 5428.00 21.0 32.6 N 32 36 E 5401.70 235.99 153.76N 181.31E 237.73 N 49.700E 1.369 5646.00 26.4 38.9 N 38 54 E 5601.24 322.88 224.81N 232.46E 323.39 N 45.958E 2.733 5932.00 32.2 44.9 N 44 54 E 5850.55 462.71 328.90N 325.85E 462.98 N 44.733E 2.271 6095.00 36.5 37.1 N 37 06 E 5985.09 554.54 398.24N 386.13E 554.70 N 44.115E 3.770 6321.00 42.9 36.4 N 36 24 E 6158.88 698.04 513.85N 472.46E 698.04 N 42.597E 2.839 6589.00 43.1 35.7 N 35 42 E 6354.89 879.56 661.62N 580.02E 879.87 N 41.240E 0.193 7053.00 43.6 36.8 N 36 48 E 6692.30 1196.03 918.48N 768.36E 1197.49 N 39.914E 0.195 7534.00 44.1 40.6 N 40 36 E 7039.17 1528.36 1178.49N 976.66E 1530.60 N 39.650E 0.557 7996.00 44.4 45.6 N 45 36 E 7370.10 1850.62 1413.80N 1196.86E 1852.39 N 40.250E 0.758 8469.00 43.1 46.6 N 46 36 E 7711.77 2177.14 1640.60N 1432.54E 2178.01 N 41.127E 0.311 8850.00 40.7 44.5 N 44 30 E 7995.34 2431.24 1818.76N 1614.15E 2431.74 N 41.589E 0.730 9226.00 42.8 48.7 N 48 42 E 8275.84 2680.98 1990.73N 1796.01E 2681.17 N 42.056E 0.930 9433.00 45.4 41.3 N 41 18 E 8424.48 2824.81 2092.52N 1897.80E 2824.94 N 42.206E 2.785 9663.00 54.0 36.4 N 36 24 E 8573.10 2999.60 2228.96N 2007.69E 2999.85 N 42.010E 4.075 rELECO Job # 691 TAK 04/17/89 ~ Page 3 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH' BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' 9855.00 59.9 38.9 N 38 54 E 8677.77 3159.81 2356.31N 10091.00 63.7 46.3 N 46 18 E 8789.27 3367.62 2509.28N 2105.95E 3160.26 N 41.789E 3.261 2246.60E 3368.04 N.41.839E 3.197 k0189.00 66.6 44.9 N 44 54 E 8830.45 3456.42 2571.49N 2310.13E 3456.77 N 41.935E 3.230 [0317.00 70.1 45.2 N 45 12 E 8877.66 3575.28 2655.52N 2394.32E 3575.55 N 42.039E 2.743 [0411.00 73.9 45.6 N 45 36 E 8906.71 3664.56 2718.28N 2457.96E 3664.78 N 42.121E 4.063 [0537.00 78.2 45.2 N 45 12 E 8937.07 3786.69 2804.13N 2545.01E 3786.85 N 42.227E 3.427 [0665.00 77.5 42.4 N 42 24 E 8964.02 3911.79 2894.43N 2631.61E 3911.92 N 42.277E 2.207 2755.88E 4094.99 2859.64E 4247.84 L0852.00 79.0 43.1 N 43 06 E 9002.10 4094.86 3028.87N L1007.00 82.0 42.4 N 42 24 E 9027.68 4247.71 3141.11N N 42.298E 0.882 N 42.314E 1.986 Ll133.00 81.9 40.6 N 40 36 E 9045,33 4372.44 3234.55N 2942.30E 4372.58 N 42.291E 1.417 L1348.00 81.6 41.3 N 41 18 E 9076.18 4585.11 3395.25N L1472.00 81.6 40.3 N 40 18 E 9094.29 4707.70 3488.11N 3081.75E 4585.30 3161.91E 4707.93 N 42.229E 0.351 N 42.192E 0.798 ® © TELECO 0 i i £ i e 1 d Serv i c~s VERT I CAL PROJECT i ON 0 2000 9000 4000 5000 6000 7000 8000 9000 10000 11000 1000 ;2000 9000 4000 ~000 6000 4800 EAST , 800 800 1600 2400 : : : J I ~ : ,_~._4-__] :9200 4000 4800 GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION COMP/~'~ # W-21 WELL NAME WEST EILEEN LOCATION AL389-D14 SINGLE SHOT & MWD 4/17/89 DIRECTIONAL ~ /'~ NAME TITLE SIGNATURE 469 FT 11472 FT DEPTH INTERVAL FROM TO 3/~.1/89 4/15/s9 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ~~~IN STRICTEST II/ED GREAT LAND DIRECTIONAL. DRILLING, INC Client .............. : BP EXPLORATION Well ................ : WEST EILEEN N W-21 Vert~col Section at.: N 42.75 E Mognet~c De¢]~not~on: 31 deg 48 m~n E Doto file nome ...... : B:WW2]D.DAT RECORD OF SURVEY (We]] assumed vertical to MD of 4/17/85 ComputotJon: RADIUS OF CURVATURE Su=vey dote: 3/28/89 Method ..... : SINGLE SHOT & MWD RKB Height.: 90.9 Ct 0.0! MEAS DRIFT TRUVERT SUBSEA SECTION C 3EPTH DG MN DEPTH DEPTH DIST ANGLE 0 0 0 0.00 -90.86 0.00 N 0.00 E 469 0 0 469.00 378.14 0.00 N 0.00 E 795 4 45 794.63 703.77 12.22 N 68.00 E 5773 6 30 97]r.7~ 880.570 26.39 N 88.00 E 1185 S 0 1182.657 109].83 40.80 S 88.00 E DIRECTION RELATIVE COORDINATES FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E 5.06 N 12.52 E 8.67 N 257.50 E 8.6? N 50.74 E ] 364 1{545 2.]4] 2680 3177 2 4S 1361.27 1270.41 I 30 1642.07 1551.21 0 30 2137.579 2047.13 0 ~S 2676.96 2586.10 0 24 3173.573 3083.07 ~8.21 S 82.00 E 54.15 S 82.00 E 58.23 S 69.00 E 59.32 S 47.00 E 55.93 N 61.00 W 7.61 N 62.78 E &.16 N 73.10 E 4.00 N 81.4~ E 0.571 N 86.42 E 1.8~ S 84.41 E 3678 #159 4456 4878 0 18 3674.92 3584.06 0 12 4].55.92 4065.06 0 18 4452.91 4362.05 4 36 4686.64 45575.78 57 0 4873.28 4782.42 S7.89 S 7~.30 E 59.4~ N 61.40 E 60.~7 N 30.00 W ~7.11 N 22.~0 E 88.65 N 34.?0 E 0.07 N 85.20 E 0.30 N 87.24 E ].~2 N 87.55 E 11.06 N 86.571 E 30.57 N 97.53 E 50&7 ],3 54 S058.46 49~7.60 5251 18 36 5235.08 5144.20 5428 21 0 5401.58 5310.72 564~ 26 24 5601.12 5510.26 5932 32 12 S850.43 S759.57 ].25.83 N 35.70 E 17~.79 N 33.&0 E 235.89 N 32.60 E 322.757 N 38.570 E 462.~I N 44.90 E 6]..22 N 119.15 E 103.56 N 148.41E 153.78 N 181.15 E 224.83 N 232.30 E 328.92 N 325.69 E 6095 36 30 5984.577 S8574.11 554.45 N 37.10 E 398.26 N 632] 42 54 ~158.76 ~067.570 697.94 N 36.40 E 513.87 N 65857 43 6 ~354.77 6263.571 879.47 N 35.70 E 661.64 N 7053 43 36 66572.]7 660].31 1195.93 N 36.80 E 918.50 N 7534 44 6 70357.05 6948.19 1528.26 N 40.60 E ]178.51N 385.577 E 472.30 E 5757.86 E 768.20 E 976.50 E CLOSURE DISTANCE DG MN S 0.00 N 0 0 0 E 0.00 N 0 0 0 E 13.51 N 68 0 0 E 30.75 N 73 37 32 E 51.47 N 80 18 ]7 E 63.2~ N 83 5 4 E 73.36 N 85 ]0 47 E 81.56 N 87 ]I 16 E 86.42 N 89 23 60 E 84.43 S 88 44 16 E 85.20 N 89 57 3 E 87.24 N 89 48 4 E 87.56 N 89 4 9 E 87.61 N 82 44 557 E 102.20 N 72 35 51 E 133.95 N 62 48 23 E 180.97 N SS S 36 E 237.62 N 49 40 18 E 323.29 N 45 S6 57 E 462.88 N 44 43 3 E 554.60 N 44 6 8 E 697.94 N 42 35 10 E 879.78 N 41 13 52 E 1197.40 N 39 54 28 E 1530.51 N 357 38 41E DOG I.E( deg/lOC 0.00[ 0.00( 1.45'~ O. 994 0.70E 1. 257 0 0.202 0.04~ 0.07( 0.02( O. 02~ O. 03Z 1. 842 2.34~ 2. 5572 2.55; 1.35~ 2. 542 3. 2.83E O. 142 O. 1Se O. 357e WEST EILEEN ~ W-21 q/17/SP RECORD OF SURVEY MEAS DRIFT TRUVERT SUBSEA SECTION DEPTH DG MN DEPTH DEPTH DIST DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 7996 ~4 24 7369.98 7279.12 ],850.53 N 45.60 E ].413.83 N 1196.71E 8469 q3 6 7713.65 7620.79 2377.04 N 46.60 E 1640.62 N 1432.38 E 8850 40 q2 7995.2] 7904.35 2431.15 N 44.50 E 1818.78 N 1613.99 E !9826 42 48 8275.7] 8184.85 2680.89 N 48.70 E ]990.76 N ]795.86 E 9433 45 24 8424.35 8333.49 2824.72 N 4].30 E 2092.54 N ]897.64 E ~6'63 54 0 8572.~8 8482.12 2999.51 N 36.40 E 2228.98 N 2007.54 E 9855 59 54 8677.64 8586.78 3159.72 N 38.90 E 2356.34 N 2305.79 E ].0091 63 42 8789.14 8698.28 3367.53 N 46.30 E 2509.30 N 2246.45 E 10189 66 36 8830.32 8739.46 3456.33 N 44.570 E 2571.53, N 2309.577'E 10317 70 6 8877.54 8786.6B 3575.19 N 45.20 E 2655.55 N 2394.1~ E ~041~, 73 54 8906.58 88~5.72 3864.47 N 45.60 E 2718.31N 2~57.80 E ~0537 78 12 8936.~5 8846.057 3786.60 N 45.20 E 2804.15 N 2544.85 E ~06~5 77 30 85763.89 8873.03 3911.70 N ~2.40 E 2894.46 N 2631.45 E 10852 79 0 9001.97 8911.~1 4094.77 N 43.10 E 3028.89 N 2755.72 E ]1007 82 0 9027.55 85738.857 4247.63 N 42.40 E 3141.14 N 2859.48 E ],1]~33 81 54 9045.19 8954.33 4372.35 N 40.60 E 3234.57 N 2942.]5 E 1348 81 3& 9076.04 8985.],8 4585.02 N 41.30 E 3395.28 N 3081.60 E ].1472 81 36 90~4.16 9003.30 4707.62 N ~0.30 E 3488.14 N 3161.75 E CLOSURE DISIANCE DG MN S 1852.30 N 40 14 44 E 2377.98 N 4~, 7 24 E 2431.65 N 43. 35 10 E 8681.09 N 42 3 13 E 2824.85 N 42 :!2 33 E 2999.76 N 42- 0 28 E 3160.17 N 41 47 10 E 3367.575 N 41 SO 3] E 3456.~8 N 41 SS 557 E 3575.46 N 42 2 13 E 3664.70 N 42 7 8 E 3786.76 N 42 13 2~ E 35711.83 N ~2 16 30 E 4094.90 N 42 ~7 47 E 4247.75 N 42 18 45 E 4372.457 N 42 17 22 E 4585.21 N 42 13 38 E z~707.84 N 42 1:]. 24 E DOG LEC deg/JOO O. O. 292 O. 672 O. 760 2.20E 3. 957] 3. 2. 742 4. 062 3. 2. 0.88C 1.98~ ~ .402 O. 34E O. 785 C. C C WFST EILEEN ~ W-81 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 4/]?/89 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DL:PTH DEPTH DEPTH DIFF. CORRECT · 91 9] 0 0 0 ]91 191 100 0 0 C 291 291 200 0 0 391 391 300 0 0 491 491 400 0 0 591 591 500 0 0 69], 691 600 0 0 791 791 700 0 0 892 89J 800 992 991 900 I 0 ]093 ],091 1000 2 1 1],93 1191 1100 2 0 ]293 1291 1200 2 0 1394 1391 ]300 3 1 1494. 149] ]~00 3 0 1794 1894 ]591 ]SO0 3 0 1891 1600 3 0 179], ]700 3 0 1891 1800 3 0 1991 1900 3 0 2094 2091 2000 3 0 2194 2].9] 2]00 3 0 2294 229]. 2200 3 0 2394 2391 2300 3 0 ~494 2491 2400 3 0 2594 2591 2500 3 0 2694 2691 2600 3 0 9794 2791 2700 3 0 ?894 2891 2800 3 0 2994 2991 2900 3 0 RELATIVE COORDINATES FROM WELL-HEAD 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.34 N 0.84 E 1.89 N 4.69 E 3.45 N 8.53 E S.O0 N 12.38 E 7.02 N 2].75 E 8.67 N 31.42 E 8.~57 N 41.49 E 8.62 N 5].29 E 8.03 N 58.03 E 7.4{5 N ~53.87 E 6.95 N ~57.54 E 8.43 N 71.22 E 5.95 N 73.92 E 5.52 N 75.81 E 5.08 N 77.29 E 4.t~4 N 78.98 E 4.21 N 80.{57 E 3.70 N 8].95 E 3.12 N 82.87 E 2.55 N 83.79 E 1.97 N 84.70 E 1.40 N 85.t52 E 0.83 N 8¢5.35 E 0.27 N 85.9& E 0.28 S 85.55 E 0.84 S 85.15 E WEST E]LEEN ff W-21 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 3094 3194 3294 3394 3494 3&94 3994 4094 4194 ~394 4494 h 594 4?'95 4896 4998 5101 5205 S310 5417 S526 5635 5749 5864 5981 610,3 3091 3000 3 0 3191 3100 3 0 3291 3200 3 0 3391 3300 3 0 3491 3400 3 0 3591 3500 3 0 3691 3600 3 0 3791 3700 3 0 389] 3800 3 0 3991 3900 3 0 409] 4000 3 0 419] 4100 3 0 4291 4200 3 0 4391 4300 3 0 4491 4400 3 0 459.1 4500 4691 4600 4791 4700 4891 4800 4991 4900 5091 SO00 ]0 3 5191 5100 14 4 5291 5200 19 S 5391 5300 26 7 5491 5400 35 9 5591 5500 44 9 S691 5600 58 ]4 5791 5700 73 1S S89] S800 90 17 5991 5900 112 22 RELATIVE COORDINATES FROM WELL-HEAD 1.40 S 84.74 E 1.79 S 84.43 E 1.41 S 84.59 E ].02 S 84.75 E 0.64 S 84.9] E 0.25 S 85.07 E 0.08 N 85.27 E 0.13 N 85.69 F. 0.18 N 86.].2 E 0.22 N 86.54 E 0.27 N 86.96 E 0.43 N 87.27 E 0.81 N 87.38 F_ 1.19 N 87.48 E 2.99 N 87.45 E 7.11N 87.17 E 11.50 N 87.15 E 2].95 N 92.84 E 33.48 N 99.58 E 50.03 N 111.25 E 68.99 N 124.52 E 92.96 N 141.09 E 120.39 N ]59.38 E /SO.SS N 179.04 E 185.57 N 204.04 E 22:].. 18 N 262.30 N 304. OS N 349.76 N 402.18 N 229.67 E 265.92 E 303.38 E 343.80 E 388.89 E WEST EILEEN ~ W-22 DATA INTERPOLATED FOR EVEN ]00 FEET OF SUBSEA DEPTH h/17/89 MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DIFF. CORRECT 6233 6091 6000 142 30 6365 6191 8100 174 32 ~502 ~291 6200 211 37 ~839 6391 6300 248 37 d776 8491 8400 285 37 6914 6591 6500 323 38 7051 ~691 8800 3~0 37 7190 ~791 6700 399 39 7329 6891 6800 438 39 7467 6991 6900 476 38 7608 709J 7000 5~.5 39 774.6 7191 7JO0 555 40 7886 7291 7200 595 40 8025 7391 7300 634 39 8163 7491 7400 672 38 830~ 7591 7500 ' 711 39 8440 7691 7600 749 38 8575 7791 7700 784 35 8710 789~ 7800 8].9 35 8844. 7991 7900 853 34 8978 80~]. 8000 887 34 9112 8].91 8100 921 34 92q7 8291 8200 95~ 35 9386 8391 8300 995 39 ~538 8491 8400 1045 SO ~696 8591 8500 ]]OS 60 ~883 8691 8~00 1192 87 ]O0~S 8791 8700 130q ]12 ~0360 8891 8800 1469 185 ]0797 8991 8900 1806 337 RELATIVE COORDINATES FROM WEll-HEAD 468.70 N 538.07 N 613.46 N 889.12 N 785.25 N ~38.57 E q89.91E 544.79 E 800.01E 655.82 E 841.37 N 917.50 N 992.47 N 1087.43 N 1142.39 N 711.64 E 787.46 E 827.46 E 887.51 E 947.56 E 1215'. 35 N 1286.46 N 1357.57 N 1~27.69 N ].494.06 N 1010.98 E 1077.52 E 1144.06 E 1211.11 [= 1280.09 E 1580.44 N 1626.82 N 1753.22 N 1818.05 N 1349.06 E 1418.0~., E 1483. J. 1 E 15~,7.1~ E 1611.2~ E 1877.42 N 1938.73 N 2001.13 N 2069.61N 2153.80 N 1676. O] E ' 1740.84, E ]806.23 E :1874.70 E 1946.82 E 2250.74 N 2374.47 N 2511.89 N 2684.34 N 2989.67 N 2024.32 E 2122.46 E 2249.10 E 2423.35 E 2719.47 E WEST EILEEN N W-21 DATA INTERPOLATED FOR EVEN ]00 FEET OF SUBSEA DEPTH MEAS. TRU VERT SUB SEA MD-TVD VERTICAL DEPTH DEPTH DEPTH DI FF. CORRECT 9000 2358 552 RELATIVE COORDINATES FROM WELL-HEAD 3q71.23 N 31q7.15 E C Wi[_-'ST E]LEEN t~ W-21 DATA INTERPOLATED FOR EVEN I000 FEET OF MEASURED DEPTH MEAS. TRU VERT SUB SEA DEPTH DEPTH DEPTH RELATIVE COORDINATES FROM NELL-HEAD 1000 999 908 8.67 N 32.21 E ~000 1997 1906 4.62 N 79.08 E 3000 2997 2906 0.88 S 85.12 E 4000 3997 3906 0.23 N 86.56 E SO00 4993 4902 50.35 N 111.48 E 6000 5907 5816 357.85 N 350.8~ E 7000 '665~ 6563 889.16 N 7~6.68 E 8000 7373 7282 1415.74 N 1198.70 E 9000 8107 80]6 1887.39 N 1686.55 E 10000 8746 8655 2~50.32 N 2192.2] E 11000 9026 8935 3136.07 N 285,4.80 E 6500 6000 55OO 5O0O 4500 4OOO 3500 3000 2500 2000 i500 iO00 5OO 500 Marker Identification MD TVi) f)EP~ AJKB o 0 0 B! 'rD ~t4?Z 9O94 47O8 HORIZONTAL VIEW BP EXPLORATION NEST EILEEN CLOSURE 4708 ft N 42.2 E DECLINATION: 3~.BO deg E SCALE: ! inch = I000 feet DRAWN: 4/~7/B9 500 0 500 t000 2500 2000 2500 3000 3500 4000 4500 5000 5500 600 ~200 ~800 2400 3000 3600 4200 4800 5400 6OOO 6600 7200 7800 8400 9000 96OO i0200 ~OBO0 -600 VERTICAL SECTION BP EXPLORATION WEST EILEEN # W-2! SECTION AT N 42.75 E TVD SCALE · ! inch = i200 feet , ,, DEP SCALE · ! inch = ~200 feet DRAWN ' 4/~7/89 ......... ~rkmm ~den~tftca~ton 140 ~O DER:IT A) KB 0 0 0 ....... ~ TD ~2 goo4 4708 ........ _ , , , , ,, ,, ... ,, 0 600 ~200 re00 2400 3000 3600 4200 4800 5400 6000 6600 Depar"l:ur'e $UB.$URFACE DIRECTIONAL $URVEY J'~ONTINUOUS Date- Ir~ J'z~ Ja~ ,, __ n~OOL ComPany B P E X P L 0 R A T I 0 N , W®ll Name W-21(23-15-11-12)(626' SNL,1180' WEL~SEC 21~TllN,R12£) FleldlLooatiorl PRUDHOE BAY, NORTH SLQ?E- AL~/T31~I=I~II:I~ · I~~i V ~ Job Reference No. 73302 MCBRIDE ~UN o 2' 1989 Date ~as~ .Oil & Gas Cons. ,C'6'~qsslon ,.,. ~~P ~- 8 9 Comput~ By:. KOHRING GCT DIRECTIONAL ~URVEY CUSTOMER LISTING FOR BP EXPLORATZON W-Z1 C 23-15-11-1Z) PRUDHOE BAY NORTH SLOPEr ALASKA SURVEY DATE: 20-APR-89 ENt~INEER: MCBRIDE MEIHOD~ OF COMPUTATION TOOL LOCAIION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH ~0 DEG 51 MIN EAST UAIA FROM SURFACE TO 10&56o8" ACQUIRED NITH TANGENTIAL METHOD FROM SCHLUM6~R6ER GCT TOULo OATA FROM 10537' TO 1147Zm ACUUIRED WITH RADIUS OF CURVATURE METHOD FROM TELECO MEASURED WHILE DRILLING SURVE¥o MWD DATA TIED TO GCT DATA AT DEPTH 10~56o8eo COMPUTATION DATE:' 26-APR-89 PAGE UP EXPLORATIuN W-Z1 C13-15-11-11) PRUDHUE BAY NORTH SLOPE9 ALASKA DATE OF SURVEY: ZO-APR-89 KELLY BUSHING ELEVATLUN: 90.86 PT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SU~-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN O.UO 0.00 -90.86 0 O N 0 0 E IO0.UU 100.00 9.14 0 9 N 86 29 W 100.00 ZOU.O0 109.14 0 6 S 62 17 W $O0.UO 300.00 Z09.X& 0 3 S 42 41 W 400°00 400.00 309.14 0 Z S 43 31 E 500LO0 500.00 409.14 0 12 N 85 37 E 600.00 600.00 509.14 0 26 N 84 ZZ E *lO0. O0 699.9:s'J 609012 1 30 N 78 57 E BOO.U0 799.86 709.00 4 7 N 72 53 E 900.00 1:199.52 808.66 5 8 N 74 50 E 0.00 0.00 0.00 N 0.00 E 0.Z1 0.09 0.09 N 0.21 E 0.05 0.00 0.05 N O.OZ E -0.10 0.11 0.04 S 0.11 W -0-16 0.00 0.12 $ 0.10 W -0.06 0.22 0.15 S 0.08 E 0.34 0.32 0.08 S 0.61 E 1.44 2.14 0.1~, N 2.0~, E 5.35 Z.Z8 1.29 N 6.68 E' 12.32 1.62 3.75 N 14.50 E 0.00 N 0 0 E 0.24 N 68 51 E 0.05 N Z7 Z E 0.12 S 68 13 W 0.16 S 40 52 W 0.17 5 30 2 E 0.62 S 8Z 18 E 2.04 N 85 57 E 6.81 N 79 Z E 14.98 N 75 29 E 1000.00 999.07 908o11 1100.00 1090.61 1007.76 1200.00 1198.18 1107.42 1300.00 1298.05 1207.19 1400.00 1397.91 130?.06 lbOO.OO 1497.8:3 1406.97 1600.00 1591.79 1.506.93 1700.00 1697.75 1606.89 1800.00 1797.73 1706.87 1900o00 1897.72 1806.86 5 38 N 83 5 5 3 N 89 3 E 4 21 S 86 21 3 20 S 84 24 2 36 S 7'923 2 3 S '73 23 I 37 S 69 ZO I 19 S 64 23 I 6 S 57 47 E 057 S 50 14 E 19.68 0.39 5.35 N 23.90 26.27 0.76 5.98 N 33.25 31.60 1.02 5.83 N 41.56 35.54 0.84 5.26 N ¢8.26 38.35 0.74 4.58 N 53.34 40.Z0 0.67 3.62 N 57.26 41.37 0.28 2.59 N 60.Z.5 42.13 0.19 1.61 N 62.55 42.59 0.35 0.61 N 64.42 41.72 0.Z1 0.47 S 65.86 24.49 N 77 23 E 33.78 N 79 ~8 E 41.97 N 82 0 E 48.54 N 83 47 E 53.53 N 85 5 E 57.38 N 86 Z2 E 60.50 N 87 32 E 61.57 N 88 31 E 64.42 N 89 27 E 65.86 S 89 35 E ZO00.O0 199'1.70 1906.84 1100.00 Z097o70 2006.84 ZZO0.UO Z197.69 2106.83 Z300oOU Z197.69 Z206.83 Z4UO.OO 1397.69 1306.83 1500.00 Z497.68 2406.82 Z6OO.UU 1597.6/' 1506.81 1700.00 169-/.67 2606.81 2800.00 2797.66 2706.80 ZgO0oUO 2897.66 '2806.80 040 S 55 14 E 0 34 S 56 28 E 0 31 S 56 Z E 0 29 S 59 23 E 0 27 S 38 34 E 0 37 S 33 30 E 0 43 S 36 54 E 0 42 S 36 53 E 0 28 S 38 13 E 0 18 S 37 55 E 42.83 0.16 1.33 S 67.02 E 42.95 0.07 1.97 S 67.93 E 43.06 0.03 2.52 S 68.74 E 43.23 0.16 2.98 S 69.54 E 43.24 O.ZO 3.50 S 70.15 E 43.00 0..01 4.27 S 70.68 E 41.72 0.00 5.23 S 71.36 E 42.45 0.03 6.25 S 72.13 E 41.21 0.23 7.13 S 71o78 E 42.09 0.17 7.66 S 73.20 E 67.04 5 88 51 E 67.96 S 88 ZO E 68.79 S 87 54 E 69.60 70.Z4 S 87 8 E 70.81 S 86 32 E 71.56 S 85 4,8 E 71.40 S 85 2 E 73.13 S 84 14 E 73.60 $ 84 I E 5OO0.OU 1997.66 1906.80 3100.00 3097.66 3006.80 3Z00.00 ~197.66 3106.80 ~$00.00 3297.66 ~Z06o80 ~400000 3397.66 3306.80 3500.00 3497.66 3406.80 3600.00 3597.65 3506.79 5700.00 3697.65 3606.79 ,~800.00 3 l'9'1.65 3706079 3900.00 5897065 ' 3806.1'9 0 9 S 6 37 E 0 12 S 11 13 E 0 8 S 57 30 W 0 13 N 86 46 ~ 0 9 N 16 43 W 015 N 4 50 E 015 N 19 9 E 0 11 N 42 42 E 0 15 N 61 Z8 E 0 16 N 69 47 E ~1.95 0.09 7.98 S 73.37 E 41.71 0.24 8.32 S 13.39 E 41.53 0.16 8.51 S 73.33 E 41.17 0.18 8.55 S T2.99 E 41.21 0.26 8.44 S 71.76 E 41.53 0.18. 8.03 S 71.78 E 41.86 0.14 7.64 S 72.84 E 42.26 0.14 7.27 S 73.01 E 42.64 0.00 7.04 S ?3.33 E 43.07 0.00 6.85 S 73.76 E 73.80 S 83 47 E 73.86 S 83 31 E 73.82 S 83 22 E 73.49 S 83 18 E 73.25 5 83 23 'E 73.Z2 S 83 42 E 73.2~ $ 8~ 0 E 73.37 S 8~ 18 E 73.67 ~ 84 31 b 74.08 S 84 41 E BP EXPLORATION W-Z1 t23-15-11-12) PRUDHOE BAY NURTH 5LOPEr ALASKA COMPUTATZDN DATE: 26-APR-89 PAGE Z DATE OF SURVEY: ZO-APR-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVElq 100 FEET OF HEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH UEPTH DEPTH DEPTH' OEG M[N DEG M[N 4000.00 3997.65 3906079 4100.00 4091.65 4006.79 4Z00.00 4197.65 4106.79 ½5U0oUU 4297.65 4206.19 4400.00 4397.65 4306.79 4bO0.O0 4491.65 4406.79 4600.00 4597.63 4506.'T7 '4700.00 4697.43 4606.57 4800°00 4796.91 4706.05 4900,00 4895.88 4805.02 0 10 N 66 34 E 0 10 S 84 56 E 0 9 S 76 54. E 0 1 S 27 49 W 0 2 N 80 32 W 0 17 N 20 54 W 2 18 N 8 13 E 4 4,?. N 20 38 E 7 0 N 28 14 E 9 26 N 33 18 E SUO0.OO 4994.09 49030Z'3 12 7 blO0oO0 5091.33 5000.47 14 49 5ZUO.OU 5187.37 5096.51 17 27 5300.00 5282.11 5191.25 19 48 5400.00 5375.61 5284.75 21 43 bSUO.O0 5467.96 5377.10 23 27 5600.00 5558.88 5468.02 25 38 blO0oO0 5648.32 5557.46 Z7 36 5800.00 5736.06 5645.Z0 Z9 4Z 5900.00 5822.04 5731.18 31 42 VERTICAL DOGLEG RECTAlqGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET BEG/lO0 FEET FEET FEbT DEG MIN 6000.00 5906.21 5815.35 33 44 6100.00 59~1.96 5897.10 36 3Z 6Z00.00 6061.22 5976.36 38 41 6300.00 6143.49 6052.63 42 3 6400.U0 6216.43 6125.57 43 43 6bUO.UU 6Z80.80 6197.94 43 26 6600.00 6361.70 6~?0.84 4Z 56 61000~0 64~4.89 6344003 43 6800.00 6507.~8 6416.52 43 53 6900.00 6579.5Z 6688066 43 43.47 0.17 6.70 S 74.20 E 43.71 0.01 6.65 S 7~.52 E 4~.87 0.06 6.70 S 74.81 E 43.91 0.09 6.75 S 74.94 E 43.83 0.00 6.77 S 74.85 E 43.90 0.61 6.59 S 74.74 E 45.39 2.84 4.65 S 74.77 E 51.01 Z.Z3. 1.24 N 16.56 E 60.72 Z.88 10041 N 80.80 E 74.79 3.16 22.60 N 88.20 E N 33 1 E 93.41 2.76 N 32 44 E 116.49 2.60 N 30 14 E 143.87 Z.74 N 31 34 E 175.38 2.07 N 33 16 E Z10.43 2.18 tq 35 9 E 248.52 2.33 N 36 43 E 290.00 1.94 N 38 ZZ E 334.64 2.39 N 40 Z9 E 382059 2.30 N 42 15 E 433.63 Z.13 N 41 2 E 487.59 N 35 42 E 545.09 N 34 16 E 605.66 N 35 37 E 669098 N 34 39 E 738.06 N 34 24 E 806.63 N 34 30 E 874.66 N 34 27 E 942.39 N 34 29 E 1010.84 N 34 58 E 1079o69 7000.00 6651.05 6560.99 43 37 N 35 1~ E 1148.41 7100.00 6724.14 6633.28 43 47 N 35 56 E 1217.21 7200000 6796.27 6705041 43 48 N 36 4~ E 1286.Z7 7500.00 6868.69 6777.83 43 20 N 37 29 E 1355.07 1400000 6941.3Z 6850.~6 43 35 N 38 11 E 1423072 15BO. O0 7013.56 6922.70 43 56 N 38 55 E 1492.82 7600000 708:t5.17 6994.31 46 34' N 40 42 E 1562.60 7100.U0 r156.40 7065.54 44 3Z N 42 35 E 1632.77 TUO0°UO 7ZZ7.77 7136.91 44 20 N 43 34, E 170Z.77 1900.00 7299.42 7208.56 44 10 N 44 13 E 1772.4.2 74.50 5 64 50 E 74.Ul S 84 53 E 75.11 5 8¢ 53 E 75.24 S 8~ 51 E 75.15 S 84* 4*9 E 75003 S 84 57 E 74.92 S 86 Z6 E 76.57 N 89 4 E 81.47 N 82 39 E 91.05 N 75 37 E 38.31 N 98.50 E 105.69 N 68 44 E 57.75 N 111.3Z E 125.40 N 62 34 E 81.67 N 125.52 E 149.~5 N 56 57 E 109.02 N 142.05 E 179.06 N 52 29 E 139.02 N 160.93 E 212.67 N 49 10 ,E 170.73 N 182.52 e Z49.92 N 46 54 E 204.38 N 207.00 E 290.90 N 45 Z1 E 239.84 N 234.25 E 335.26 N 44 19 E 276.88 N 264.72 E 383.06 N 43 42 E 315.15 N 298.50 E 434.08 N 43 26 E 4.12 3.68 Z.86 3.35 0.87 0.40 0.42 0.72 0.41 355.14 N 334.74 E 488.03 N 43 18 E 400.29 N 370.44 E 545.40 N 4Z 46 E 450.57 N 404.91 E 605.77 N 41 56 E 503.50 N 442.03 E 670-00 N 41 16 E 559034 N 481.53 E 738.06 N 40 4*3 E ~ 616.27 N .520053 E 806.69 N 40 11 E 672.71 N 559.27 E 874.U3 N 39 44 E 728.86 N 597.88 E 942.71 ~ 39 21 E 785.68 N 636.82 E 10~1.55 N 39 I ~ 842.58 N 676.28 E 1080.42 N 38 45 e 0.30 0.77 0.52 0.78 0.50 1.17 1.59 0.99 0.76 0.30 899.03 N 716.06 E 1149.35 N 38 32 E 955.22 N 756.26 E 1218.35 N 38 22 E 1010.97 N 797.38 E IZ87.58 N 38 15 E 1065.96 N 838.98 E 1356.52 N 39 12 E 1120.21 N 881.20 E 1425.26 N 38 11 E 1174.34 N 924.23 e 1494.41 N 38 12 E 1227.98 N 968.88 E 1564.18 N 38 16 E 1280.36 N 1015.58 e 1634.24 N 3~ 25 E 1331.51 N 1063.45 E 1704.06 N 38 36 E 1381.72 N 1111.86 E 1775.53 N 38 49 E COMPUTATION DATE: Z6-APR-B9 PAGE 3 BP EXPLORATLON W-21 (23-15-11-12) PRUUHOE BAY NORTH SLOPE9 ALASKA OATE DP SURVEY: 20-APR-89 KELLY 8USHING ELEVATIUN: 90.86 FT ENGINEER: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED YbRTICAL VERTICAL DEVIATION AZIMUTH UEPTH DEPTH DEPTH OEG'r MXN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEeT DEG 'MIN 80UO.UU 73r1.06 7280.Z0 44 17 8100000 744Z.35 7351.49 44 54 8ZO0.UO 7513.08 7422.22 44 46 8~00.00 7584.61 7493.75 43 54 '8400.00 7656.97 7566.11 43 22 8500.00 7730.04 7639.18 42 43 8600.00 7803.85 7712.99 42 10 8'~00.U0 7878.15 7787.29 41 51 8800.00 7952.98 7862.12 41 9 8900.00 8028.79 7937.93 40 23 N 44 29 E 1842.,05 N 45 0 E 1912.01 N 45 20 E 1982.50 N 45 10 E 2052.18 N 44 55 E Z121.01 N 45 0 E Z189.10 N 44 53 E Z256.41 N 44 35 E 2323.18 N 44 17 E 2389.38 N 44 21 E Z454.47 0.27 0.99 1.01 0.68 0.6.4 0.66 0.46 0.48 0.92 0.30 1431.60 N 1160.64 E 1842.98 N 39 1 E 1481.41 N 1210.01 E 1912.77 N 39 14 e 1531.20 N 1260.19 E 1983.09 N 39 27 E 1580.38 N 1309.84 E Z052.63 N 39 39 E 1629.17 N 1358.66 E 2121.35 N 39 49 E 1677.47 N 1406.89 E 2189.35 N 39 59 E 1725.21 N 1454.59 E 2256.58 N 40 8 E 1772.74 N 1501.70 E 2323.30 N 40 16 E 1820.10 N 1548.14 E 2389.46 N 40 23 E 1866.76 N 1593.70 E 2454.52 N 40 29 E 9UOU.UO t~104.Bb 8013.99 40 42 910000U 8180.Z6 8089.40 41 24 9ZO0.OO 8254066 8163.80 42 29 9~00.00 ~3,~7.56 8Z36.70 43 48 9400.00 83~9.17 8308.31 44 48 9500.00 8469.09 8378023 46 43 9600.00 8535.40 8444.54 50 34 9100.00 8595.69 8504083 55 5 9800000 8650.12 8559o26 58 38 9900000 8700.69 8609.83 60 36 N 44 45 E 2519.Z7 N 45 43 E 2584.75 N 47 Z E 2651.25 N 47 17 E 2719.27 N 42 16 E 2788.85 N '36 51 E 2860.27 N 35 5 E 2934.79 N 35 35 E 3014.17 N 36 16 E 3097.72 N ~8 28 E 3183.81 0.69 1.30 1.38 1.60 4.49 4.06 4.94 4.43 Z.97 3.06 1913.07 N 1639.21 E 2519.29 N 40 35 E 1959.36 N 1685.79 E 2584.76 N 40 ~2 E 2005.43 N 1734.17 E 2651.25 N 40 '51 b 2051.86 N 1784.47 E 2719.28 N 41 0 E 2101.14 N 1833.86 e Z788.88 N 41 6 E 2156.36 N 1879.Z0 E Z860030 N 41 4 E 2217.15 N 1922.82 E 2934.79 N 40 56 E 2282.2! N 1968.94 E 3014.17 N 40 47 E 2350.12 N Z018.15 E 3097.74 N 40 39 E 2418.79 N 2070.36 E 3183.~5 N 40 33 E 10000.00 87~8.70 8557.84 62 10 10100.U0 8794.37 8~03.51 63 31 10200.00 8836.57 8745.71 66 38 1U3OO.O0 8874.16 8783.30 69 19 10400000 8906.40 8815.54 73 8 N 41 4 E 3271.50 N 44 12 E 3360.40 N 43 43 E 3450.90 N 43 34 E 3543.45 N 44 Z E 3637.96 3.57 2.85 Z.96 2.93 2486.24 N 2126.42 E 3271.55 N 40 32 E 2551.55 g Z186.80 E 3360.43 N 40 35 E 2616066 N 2249.86 E 3450.91 N 40 41 E 2683085 N 2313.66 E 3543.~6 N 40 45 I~ 2752006 N 2379.27 E 3637.96 N 40 50 E 10~56.~ ~ TIE IN POINT GOING PROH GCT TO MWO DATA (SEE INTERPOLATED VALUES FOR CHOSEN HORIZUNS). q~ I0500.00 8931.40 8540.54 77 4 10600.00 895Z.99 8862.13 77 51 lOlO0.UO 8973.80 8882094 TT 46 10800000 8994016 8903030 78 34 10900.00 9012.67 8921.81 79 55 N 44 24 E 3734.61 N 43 49 E 3832.10 N 42 31 E 3929.80 N 42 54 E 4027.65 N 42 52 E ~,125.84 1.85 Z.83 1.96 1.25 1.ZZ 2821.56 N 2446.65 E 3734.61 N 40 55 E 2891.78 N 2514.51 E 3832.12 N 41 0 E 2962.80 N 2581.74 E 3929.83 N 41 4 E 3034.69 N 2648020 E ~027.69 N 41 6 E 3106.83 N 2714.89 E 412~090 N 41 8 E 11000.00 90Z9.17 8938.31 81 51 11100.00 90~3.35 8952.~9 81 55 llZO0.UU 905~.59 8966.73 81 48 11300.00 9071094 8981008 81 40 11400000 9086.42 8995.56 81 36 11~00.00 9101.03 9010.1] .81 36 11514.00 9103.08 9012.22 81'36 N 42 25 E 4224.40 N 41 4 E 4323.38 N 40 49 E 4422.35 N 41 8 E 452[.32 N 40 52 E 4620.26 N 40 18 E 4719~19 N 40 18 E 4733.03 1.94 1.57 1.08 0.59 0.54 0.00 0.00 3179.25 N 2781.83 E 422k.47 N 41 11 E 3253.28 N 2847.53 E 4323.45 N 41 11 E 3327.83 N 2912.~ E 4422.43 N 41 11 E 3~0Z.58 N 2971.50 E 4521.40 N ~1 11 E 3477.40 # 3042.24 E 4620.34 N 41 10 E 3552.44 N 3106.70 E 4719.26 N 41 10 E 3563.00 N 3115.66 E 4733.11 N 41 10 E BP EXPLORAT[UN ~I-Z1 (Z3-ZS-11-1Z) PRUDHUE BAY NURTH SLOPEr ALASKA COMPUTAT1'ON DATE: Z6-APR-89 DATE OF SURVbY: ZO-APR-89 KELLY BUSHING ELEV'ATION: 90.86 PT ENGINEER: ~CBR/D~ ZNTERPOLATED ViI, LUt::S FOR EVEN 1000 FEET DF MEA$UREO DEPTH TRUE SUB-SEA COURSE tqI::ASUREU VERTICAL VERT/CAL DEYZATI'ON AZTMUTH DEPTH DEPTH DEPTH DEG M]:N DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HURIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/~EST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET .DEG MZN 0.U0 0o00 -90.86 0 0 1UUO.UU 999.07 908.Z1 5 38 ZO00.OO 1997.70 1906.84 0 40 3000.00 Z997.66 2906.80 0 9 · 000.00 3997,65 3906.79 0 10 5000.00 4994.09 4903.Z3 12 7 6000.00 5906.Z1 5815.35 33 44 7000°00 6651.85 6560.99 43 37 tSOUOeUO 73'1'1.06 7'Z$OoZO 44 1.7 9000.00 8104.B5 8013.99 40 4Z N 0 0 l: 0.00 N. 83 5 E 19.68 S 55 1~ E 42.83 S 6 37 E 41.95 N 66 34 E 43.47 N 33 I E 93.½1' N 41 2 E 487.59 N 35 18 E 114t3.41 N 44 Z9 E 184Z.05 N 44 45 E Z519.27 0.00 0.39 0.16 0.09 0.17 Z.16 4.12 0.30 O.Z7 0.69 0.00 N 0.00 E 0.00 N 0 0 E 5.35 N Z3.90 E Z4.~9 N 77 Z3 E 1.33 S 67.0Z E 6~.04 $ 88 51 E 7.98 S 73.37 E 73.80 S 83 ~7 e 6.70 S '14.gO e 74.50 S 84 50 E 38.31 N 98.50 E 105.69 N 68 44 E 355.14 N 334.74 E 488.03 N 43 18 E 899.03 N 716.06 E 1149.35 N 38 32 E 1431.60 N 1160.64 E 1842.98 N 39 I E 1913.07 N 1639.Z1 E ZS19.Z9 N ~0 35 E 10000.00 87~8.70 8657.84 62 10 N 41 4 E 3271.50 3.57 2486.2/e N ZIZ6.42 E 3271.55 N 40 32 E 104.56.1:J ~:O:q~ T.[E T# POI:NT 50ING PROM GCT TO tqklD OAIA CSEe TNTERPOLATEO VALUES FOR CHOSEN HORIZONS). ~&~: 11000.UU 90Z9.17 8938.31 81 51 11514.00' 9103.08 9012.22 81 36 N 42 25 E 4224.40 N 40 18 E 4733.03 1.94 0.00 3179.25 N Z781.83 E ~,Z2~.47 N 41 11 E 3563.00 N 3115.66 E ~.733.11 N 41 10 E CONPUTATTON DATE: Z6-APR-89 PAGE 5 BP EXPLORATIUN N-Z1 (2~-15-11-12) PRUOHOE NORTH SLOPEs ALA~RA' DATE OF SURVEY: ZO-APR-B9 KELLY BUSHING ELEVATION: 90086 FT ENGINEER: NCBRIDE INTERPOLATED VALUES FOR'EVEN 100 FEET OF SUB'SEA DEPTH TRUE 'SUB-SEA ' COURSE PlEASURED VERTI:CAL VERTI:CAL DEV:[ATTON AZIIqUrH IJEPTH DEPTH OEPTH DEG #IN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST D/ST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MZN 0000 0.00 -90086 0 0 N 0 0 E 90.86 90.86 0.00 0 10 N 94 59 W 190.86 190.86 100o00 0 6 S 65 4 W Z98o86 Z90.86 ZO0.O0 0 4 S 50 41 W 390086 390.86 300.00 0 2 S 37 58 E 490086 490.86 400.00 0 11 N 87 53 E 590.86 590.86 500000 0 23 N 84 4 E 690087 698.86 600.00 I 19 N 79 7 E 790098 790.86 700.00 3 55 N 73 28 E 8910~0 890.86 800.00 5 Z N 73 41 E 0.00 0.00 0.00 N 0.00 E O.ZZ 0o05 0.08 N 0.25 E 0007 0.00 0.06 N 0,0¢ E -0.10 0.1~ 0.0~ S 0.10 W -0.15 0.00 0.11 5 0.11 ~ -0.08 0.27 0.15 S 0.05 E 0.29 0.24 0.09 S 0.54 E 1.26 Z.09 0.10 N lo81 ~ 4.81 Z.69 1.11 N 6.07 E 11.68 1.43 3.55 N 13.75 E 0.00 N 0 0 E 0.26 N 71 4 E 0007 N 35 13 E 0.11 S 70 ZON 0.16 S 19 9 E 0.55 S 80 38 E 1.81 N 86 50 E 6.17. N 19 39 e 14.Z0 N 75 30 E 991016 990.86 900.00 5 38 1092.Z0 1090.86 1000.00' 5 6 1192.56 1190.86 1100.00 1292o80 1290.86 ZZO0.O0 1~9209~ 1390.86 1300.00 1493002 1490.86 1400'00 1593007 1590.86' 1500.00 1693010 1690.86 1600.00 179301~ 1190.86 1700000 1893.14 1890.86 1800.00 N 82 46 E N 88 43 E 4 25 S 86 4,4 E 3 25 S 84 3* e Z 39 S 79 53 E 2 6 S 73 48 E ! 38 S 69 34 E I 20 S 64 35 E I 7 S 58 39 E 0 58 S 49 41 E 19.08 0.28 5.25 N 23.10 E 25.81 0.83 5.97 N 32.56 E 31.25 1.05 5.87 N 41.00 E 35030 0.73 5.30 N 47.8~ E 38.19 0.84 4.6~ N 53.02 E 40.10 0.63 3.70 N 57.03 E 41.30 0.14 2.66 N 60.06 E 42.09 0012 1.68 N 62.41 E 42057 0.39 0.68 N 64.31 F 42.72 0.15 0.40 S 65.77 E 23.69 N 77' 11 E 33.10 N 79 36 E 41041 N 81 51 I: 48013 N 83 40 E 53.Z3 N 85 0 E 57.15 N 86 17 E 60.12 N 87 27 E 62.4~ N 88 27 E 64031 N 89 13 E 65.77 5 89 39 E 199~.15 1990.86 1900.00 Z093016 Z090.86 ZO00.O0 Z193.1~ Z190086 ZlOO.O0 2293011 2290.86 ZZO0oO0 Z~9~017 Z390.86 Z~O0.OO 2493018 Z490.86 Z400.O0 2593.18 2590.86 2500o00 2693019 2690.86 Z600.00 Z193oZ0 27~0.86 Z'IO0.O0 2893020 2890086 2800.00 0 41 S 55 23 E 0 34 5 56 12 E 0 31 S 55 41 E 0 30 S 60 31 E 0 27 S 40 Z O E O 36 S 33 35 E 0 43 S 36 ~`r E 043 S 37 'rE 0 29 5 37 41 E 0 19 5 38 13 E 42.82 O.Z6 1.2~ S 66.96 42..94 0.11 1.93 5 67.88 43.05 0.05 2.48 S 68069 43.22 0.10 2.95 S 69.48 43.25 O.ZO 3.45 5 70.12 43.01 0.04 4.21 S T0.64 42.74 0.05 5.17 $ T1.31 42.~7 0.00 6.19 S 72.08 42.22 0.27 7.09 S 12.74 42.09 0.:?3 7.63 S /'3.1~3 66.97 5 88 54 E 67.90 5 8~ 22 E 69055 5 87 34 E 70.Z0 5 87 10 E 70.76 5 86 35 E 71.~0 5 85 51 e 72.35 5 85 5 ~ 2993.Z0 2990.86 2900.00 3893.&0 3090.8~ 3000.00 ~19JozO 51'~0086 3100.00 ~Z~3.ZO 3ZDU.U6 3ZOO.O?} 3J93.20 33~0.85 3300.00 3~93.Z0 3~90.86 3~00.-00 ~593.21 3590085 3500.00 3693oZ! 369U.86 3600.00 3~93021 3790.86 370Uo00 3U93.21 ~89U.~6 -3800.00 0 3 S tO Z 5 0 13 S 0 8 S 54 21 W 0 13 N 0 9 N 24 10 W 0 lb N 6 015 N 193/' E 011 N 40 0 15 N 60 46 E 0 16 N 69 4Z E 41.96 0.03 7.97 S 75.37 E 41.72 0.11 8.30 S 77.g8 E 41.54 0.13 8.5~.I S 'i'3.34 t:: 41.29 O.11 8.56 S 73.02 E 41.20 0.29 8.46 S 72.77 E '41.51 0.14 8.06 S 72.77 ~ 41.~4 O.ZO 7.67 $ 12.83 E 4, Z.Z3 O.Z1 7.28 S 72.99 E 4Z.61 0000 7.05 S 73.30 E 43.04 0.00 6.86 S 73.73 E BP EXPLORATiUN N-21 CZ3-15-11-1Z) PRUDHOE BAT NURTH SLOPE! ALASKA COMPUTATION DATE: 26-APR-89 PAGE 6 DATE OF SURVEY:: 20-APR-89 KELLY BUSHING ELEVAIION: 90.86 FT ENGINEER: MCBRIDE INTERPOLATED VALUbS FOR EVEN 100 PEET OF SUB-SEA DEPTH 1RUE SUB-SEA COURSE MEA$UREU YERTICAL VERTICAL OE¥IATXON AZIMUTH DEPTH UEPTH DEPTH DEG MIN DEG MIN VbRTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST OLST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 3~9~.Z! 3990.86 3900.00 ~093.Z! ~090.86 aO00.O0 4193.21 4190.86 4100.00 4Z93.Z1 4290.86 4200.00 459~.21 4390.86 4300000 4493.21 4490.86 4400.00 4593.23 4590.86 4500.00 4693.41 4690.86 4600°00 4'19.3.91 4790*86 4700.U0 4894o92 4890.86 4800.00 0 11 N 66 57 E 0 10 S 85 11 E 0 9 S 77 48 E 0 0 S 11 I W 0 .3 N 87 52 W 0 14 N 23 Z W 2 8 N 6 34 E 434 N 20 6 E 6 50 N 27 48 E 9 18 N 33 9 E 43.45 0.24 6.70 S 74.17 43.69 O.OZ 6.65 S ~4.50 43.86 0.01 6.69 S 74.80 43.91 0.05 6.75 S 74.94 43.84 0.00 6.77 S 74.85 43.89 0.51 6.62 S 74.75 45.14 Z.97 4.93 S 74.73 50.51 2.36 0.73 N 76.37 60.02 2.69 9.77 N 80.46 73.99 2.97 21.93 N 87.76 74.48 S 84 50 E 74.79 S 84 53 E 7b.09 S 84 53 E 75.Z4 S 84 51E 75.16 S 84 49 E 75.04 5 84 56 E 74.89 $ 86 13 E 76.37 N 89 26 E 81.05 N 83 4 E 90.46 N 75 58 E 4996.70 4990.86 4900.00 12 2 5099.52 50~0.86 5000.00 14 49 5203°66 5190.86 5100.00 17 33 ~309.31 5290o86 5200.00 19 59 5416.42 5390.86 5300.00 22 1 bbZEoU1 5490.86 5400.00 24 Z 56~5o55 55~0.86 5500000 26 15 5748.22 5690.86 5600.00 28 35 5863°49 5790.86 5700.00 30 58 5981061 5890.86 5~00.00 33 18 N 32 55 E 92.71 2.79 N 32 44 E 116.37 2.61 N 30 ZO E 144.95 2.66 N 31 36 E 178.53 1.98 N 33 40 E 216.48 1.69 N 35 39 E 258.54 2.52 N 37 15 E 305.50' 1.15 N 39 20 E 357.33 Z.49 N 41 41 E 414.64 2.18 N 41 46 E 477.47 3.19 37.72 N 98.12 E 105.12 N 68 58 E 57.65 N 111.25 E 125.30 N 62 36 E 82.62 N 126.07 E 150.73 N 56 45 E 111.75 N 143.72 E 182.05 N 52 8 E 144.12 N 164.29 E 218.55 N 48 44 E 178.93 N 188.34 E 259.79 N 46 28 E 216.80 N 216.3.5 E 306028 N 44 56 E 257.52 N 248.49 E 357.86 N 43 58 E 301.03 N 265.80 E 415.09 N 43 30 E 347057 N 328.02 E 477.92 N 43 ZO E 6103.6Z 5990086 5900.00 36 36 6230.41 6090.86 6000.00 39 35 6364067 6190.86 6100000 43 30 650Z083 6290.86 6ZO0.OO 43 26 66~9081 6390.86 6300.00 4Z 5Z 6'177.11 ~490.86 6400.00 43 46 6915068 65~0086 6500.00 43 41 7053o93 6690.86 6600.00 43 ~19Z.50 6~90.86 6700.00 43 49 7~30.48 6890.86 6800~00 ~3 20 7468051 6990.86 6901~-00 43 47 1608.00 7090086 700W. O0 44 35 TU88.06 1290.86 80Z7o68 7390.86 8168064 7490086 8~08067 7590.86 8446050 ~690.86 ~58Z.61 1190.86 8~17o07 f8~0.86 'Cz. q;g'. oJ~. 1.oo+~o ~r~ 15 'rA"eo_ o ,.7 q 35 33 E 547.24 N 34 45 E 624.77 N 35 11 E 713.81 N 34 Z4 E 808.57 N 34 32 E 901.60 N 34 24 E 995.09 N 35 3 E 1090.47 N 35 32 E 1185.48 N 36 45 E 1281.09 N 37 45 E 1375.96 N 38 33 E 1471.00 N 40 52 E 1568022 N 43 7 E 1666.63 N 44 11 E 1764.11 N 44 37 E 1861.36 N 45 18 E 1960.45 N 45 8 E 2058.18 N 44 56 E 2152.78 N 44 56 E 2244.66 N 44 31 E 2334.54 3.57 3.45 1.59 0.37 O.ZO 0.70 0.45 0.44 0.52 0.67 402.06 N 371.69 E 541.54 N 42 45 E 466.41 N 415.80 E 624.84 N 41 42 E 539.35 N 467.57 E 713.81 N 40 55 E 617.88 N 521.6.3 E 808.63 N 40 10 E 695004 N 514.63 E 901.82 N 39 34 E 772061 N 627.85 E 995.55 N 39 5 E 851.45 N 682.50 E 1091.23 N 3~3 42 E 929.37 N 737.65 E 1186.53 N 38 26 E 1006081 N '794.27 E 1Z8Z.~9 N ~8 16 E 1082.52 N 851.76 E 1377.4~. N 38 11 E 0.59 1157.32 N 910.5& E 1472.58 N 3~ 11 E 1.55 1232.22 N 972.57 E 1569.79 N 38 17 E 0.69 1305.20 N 1038.63 E 1668002 N 38 30 E 0.31 1375.76 N 1106006 E 1765.24 N 38 47 E 0.56 1445.38 N 11r4.23 E 1862.24 N 39 5 E 0.95- 1515.64 N 1244.46 E 1961.08 N 39 23 E 0.64 1584.62 N 1314.10 E Z058.61 N 39 40 E 0.67 1651.71 N 1381.15 E Z153.07 N 39 54 E 0.51 1716086 N 1446.27 E 2244.~4 N 40 6 e 0.59 1780.85 N 1509.70 E 2334.65 N 40 17 E COMPUTATION DATE: Z6-APR-89 PAGE 7 B.P EXPLORATIUN W-Z1 (Z~15-11-12) PRUDHOI:: BAT NORTH SLOPEp ALASKA DATE OF SURVEY: ZO-APR-89 KELLY BUSHING ELEVATION: 90.86 FT ENGINk~R: MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET UF SUD-SEA DEPTH TRUE SU~-SEA COURSE HEASURED' VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH OEPTH DEG IIIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DISTo AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8~b0.11 799U.86 7900.00 40 40 8981.57 8090.86 8000°00 40 36 9114.14 8190.86 8100.00 41 3Z 9149o~7 8190o86 8ZO0oOO 43 11 9368031 8~90.86 8300.00 44 39 9532006 8490.86 8~00000 47 43 969~o55 ~590.86 8500.00 54 41 9680.10 8690.~6 8600°00 60 13 10091o18 8790.86 8700.00 63 ZZ 10J49oZ! 8890.86 8800.00 7! 7 N 44 18 E Z4ZZ.1Z N 44 38 E 2507.30 N 45 54 E 2594.07 N 47 ZO E 2684.62 N 42 59 E 2780.63 N 35 49 E 2883.74 N 35 3'3 E 3007.26 N 37 54 E ~166.52 N 44 Z E 3353.42 N 43 57 E 3589.68 0.70 1.27 1.67 3.88 4.34 3.47 4.34 1843.58 N 1571.05 E Z422.18 N 40 26 E 1904.53 N 1630.78 E 2507.~3 N 40 34 E 1965.89 N 1692.49 E 2594.08 N 40 43 E 20Z8.25 N 1758.81 E Z684.62 N 40 55 E 2095.11 N 1828.27 E 278Uo66 N 41 6 E 2175.32 N 1893.15 E 2883.75 N 41 I E 2276.57 N 1964.91 E 3007.26 N 40' 47 E 2405018 N Z059.66 E ~166.b6 N 40 34 E 2546.52 N 2181.95 E 3353.~6 N 40 35 E 271T.29 N 2345.66 E 3589.68 N 40 48 E 10456. U ~ lIE IN POINT ~OING FRON GCT TO MWD DATA CSEE INTERPOLATED VALUES FOR CHOSEN HORIZONS). 1U?~3o80 ~990o86 8900°00 78 17 11430.37 9090o06 9000.00 81 36 ,11514.00 9103.08 9UIZoZZ 81 36 N 42 50 E 4011.80 N 40 38 E 4650.31 N 40 18 E 4733.03 1.37 0.65 0.00 3023.0~ N Z637.43 E 4011.~3 N 41 6 E 3500.14 N 3061o88 E 4650.38 N 41 10 E 3563.00 N 3115.66 E 4733.11 N 41 10 E SCHLUMBERGER 0 1REC T I ONAL SURVEY COMPANY BP EXPLORAT I ON WELL W-Z1 (23-1S-11-12) FI ELD PRUDHOE BAY COUNTRY USA RUN ONE DATE LOOOED 20 - APR - 89 REFERENCE '73302 WELL: (626' · "-21~ (23-1§- 11- ,,~.~ SNL, 1180' ~EL, SEC 21, TllN, R12E) ~ HORIZONTAL PROJECTION N~TH I~000 SO00 4000 3000 2000 ~000 - 1000 SOUTH -2000 -2000 NEST REF 73~B02 SCALE = 1/1000 IN/FT .... ~..,-;---.6.--~.................. ...... 4.-...;---4-...; ....... 4,---4-.-*---& ...... .6.-.4---.;--.4 ....... .L...L~ '; .......... ';-I -; -~ 4----; ........ .L...;....;.-.4 ...... ~ 4.--4---.;--.,; ................ ...... .;....;*--.;---.; ...... 4---4-~--.-; ....... 4..-.;..-.6....; ...... j .~-.4--~-..;-.,-.;--b-;,- .......... .~-.t-,b-~-.~--; , · . : ..... : : : : : : : ~ : . : ~ ~ : : : . : : ...... t : : ~ : : , . ~ . , : ~ : . ~ ! i !! ! ! ! ! .--~.-.&.*4-..~ ...... ,b-4....;-.6 ...... ~-...6....6...4-.-L-..;..-&...;,...6 ! ! ! ! J ! ! ! i ....... .;-.-.;...&...;...L..;-..4--..;....; i i i i J i ~ i i ....... .;....;....;-*-.; i i ! !Ii ! !! ..... .;...4....6....6 ...... ~..-~-..~,..~... ! ! ! !! ! ! i J ....b..~.,.~....6 ....... .;....;.,.~...~ i ! ! !! i ! ! ! ...... ~""b-H-i ....... ~-4-?'- ! ! ! !] ! i ! ! 4 ...... ...~...,M...H...,1...~...~...~ ...... ,1.4...,1.-.L4...~-...L.L,1 ....... ~...~--.~---i.-.~...~..-~.-.~--.~ ........ ::*4.--4.--~--.b~--b4--.4 ...... 4--.b4.--~-,.44---~:-..,1...~ ....... ;-.-~...~..-4...~.-..i.-.4...b4-.*i...4...;...~-.~ ....... .... ..'"'.;.**'T"T'-t**'t'"':'"'t"'T ...... ??T'"?---t"'?"":'"?-"t ...... ?--f*--H-.;.--.t---?;"-9- ?'"! ....... ?'"?*"I"*T"*t*"Y'?'"T*'T. ....... t"'T"T"T'I'"':'"'T'"?"'t. ....... I""!"'T .......... ?'"T"T"T"' F't'"T'"'..'"? ....... T. ~ ' : .... ~ ' ' ..... . ~..4...4. 4 4- . -; ~ 4....;..+--.6.--.b-..;- -~--. 4-..; .;, ..~ ...... .;..,4,...6-4 ....6..b.4; .6 ..... .; ..; .~ ..; ....... ,;..,.;...' 4- · 4 ' ~ ' '"t"f'*t*'t...'":"i'"t"t'i"'l"i"i"'??t*'r*?:.'"'!'"'i ....... t.-!*'"?"t"t"t"t.:"T"T ....... TTTT!~ ~ q ~~ ~ ~ ~!~ ~ i~ : : : : I : : ; : I ! ~ ! : ~ = : ~ I : : : ; : : : : ; ~ : ; ' ~ : : ~ ; : : : : ' ; : : ' ~ ~ : : ~ ; : ' : ..4...L.L.L..L.~...~...4-..~ ....... *..4...~...H.....:--.-:--.~..-.: ...... :..-.~...~.--.:...~-..;'-..4-..;'...~ ....... ~.--4---~---.LL~.--~---~.--: ...... ~-..~---:...~-.-]-~-*.~..*~--.~ ........ 4-4...~...~...:-4...~...4-..~ ...... ~...."...4...~ ....... .... Fb4---.~..-b--!---H---b~----bb;.--.-b~---4---bb~. ....... ;-.-b;----bbbbF-i ...... i---H-'-H-.'H'+'b~-'-i'--H'--i---f'-'H---i'-'4 ........ bF!'"~ ........ H"-i'"!'"t"'H-H-',-+-H--i'- i.,i :. :_~. i $ $ ~ £ .i i i : : : i : .~ .~, i : '...~.,L...6..6 ...; ..6.-.6--**b-.¢-.6---~.-..6---~---'.--+---.6---~--.6 ...... ,;....6. 4 .6 -.6-, .6 .6-.; .... .6 .; ..... ~ .... .6 .-4 ...6....6 ....... .;...~...~...6 ....... .;....;.,..;....; .......... .6....;...4 .... iL L.!....L+. ~...~...~..L.i.J....~...~ ~ Z.?..Z ? .:....~. )...I.]...L.L_,._~ ....... L~...L..,1.4.4...L.~...L].4...L4...L.I--':,...LL4 ........ L.L.M...~.4.4...L4 ...... 4.4...L.4 ....... ~...~.4...~ ....... i..-;.4...~...4-4.4...~...~...~.-.4....:,...,:...-:.4...4-..~.-.~...~ ....... 4-..4-4-~...H~-4.4-..4 ....... H4.--4--.HH;---;.-+.-H~--.4-.+--?:.--;---~-+.+4-4 ...... 4-..4-..4-..H~.-,;..+..;...Hb..?'.-.;...;...~ ...... ..4.,.$...,i...$...I...$...$...$...$ ....... $...,1...,1....i..I.4...L.$..,1 ....... L..L.$...$...~.4.4.4..-~ ...... .~...H.4--HHHH.4-.+..i....L...~....~...H.~-+...~...;...4 ........ b.L..4..-.*..4.-.4-...;-...~....~...!...4....~...H.; ....... H.~-+4 ...... .~...t-+-~ ....... ~.-4--,~-+- $.4.4....i.J,.**L4.4.4 ....... L4.4.4...~....i4.4.4 ....... ,1...L.L4.4:4.-&.L...~ ....... -;-.-~---4--+-4-.-;---,:.-4..-H!...HH4---;.4.--+-*Ht'.-.4 ....... ~--.;..*;---H½-.+-+.+.+..,..H,~...H~ ....... ~ i ~J i i ~ i i i ~ ~ ~ , ~ ! ~ ! ! i .[ ~ ~ i i ~, ~ ..~ ~*~.-4...1 $.4...F...i ~...L..:;..'; 1. 4.4 -: $ . .;.z ' 4..4..$ $.4-..~... ~ 4-4.4 ..L..&..&.$ ....... &.~.4...~ ....... ~...4-...~...:- --.4...4---44444'44...~...444.-.4...b.~.--bb.~ ....... ~...4..-;4.--bb4--.;.--; ....... H--H--.bbbi4--.'.-.H--H4*-H.-.b$ ....... bH.-.; ....... ~-..i.-.;-..i...i..H..H ....... -.-4-,-.H--+--f-+--4--+--4--- -q...4..-4--.4.-.;...H4---4...4 ...... 4---4,.-4---4---f*-4-*-4.*-4-..4 ....... H--+-+-+.+-+.-+--4 ...... +.-+-+.t.++.+.+..4 ....... t..t.+..t...i..+.+..+...? ....... ~...~....;...+...i.-t · -4-,.4--4-..$...;..4..4...$-.~ ...... ~.-~*-.4-4..-~.-.4-4-..&4 ....... ~...4-4..4---4-4.,4.4.*-~ ........ $.4...&4..-~.4.4...$...4 ..... $...4-.4.4..+.4...&.4-.4 ....... 4-,.4-..&.*.-.4 -'4'"4"'4'-'4 ....... ;...;...J...~..., ..4...t-&4 ~-'-H4'--4---4---;-4'*-4--; ...... ;:.-;...4.*-;...;..-;-'-;--';...; ....... ;-.-4,--;--4---4*--;."---4--.;-'*; ........ 4.*';"'~"';'"f.-;.'.;-"4'"; ...... 4...;--.;.--4.-.i--.4..-4,*.;-..4....*-~,.;...~..~,~..i$.H4...~ ....... 4'",.'"-'4"'4"'i"'4"4"*;"'4 ....... 4...4...$...%++..4...+ .... --,-..,...,...,...,.-,...,...,.-, ...... ,1..-,1...;...Lb:....4---4.--$ ....... ,-.-,,..,...,-.,...,..-,...,..., ........ ,...,..,-.,..-,...,..,...,..., ...... ,...,...,...,..,-.,...,-.,-.,.,,.,...,..,...,...,-.,...,...,..., ....... 4...4...4...4...4...4...z...4..4 ....... ,...,...,....,...,...,..,...,..., .... ...4-4.--.;-*4-.-.L.,1...&.$-4 ...... J,.4...&.L..;...,1-~.4.4 ....... ~...$...J,.4-4.4.4.4.4 ........ 4-4...~...;:..J,.4.4.4.-4 ...... $.4"4.4.."}-4..4`..$~..~.....L~.4-~.4.~.~.4~4~4...$~.4......4.4...4.4...~...;..4...~..*$ · .-H..+..4...;.-.bb;...; ...... H...;...'4.4-..bb~.-.'+ ....... .H-bb-:.;-.-b;--.4.--; ........ H-H--i---.H--H ...... +'-H--"!-'H'--4~H'k~.-H"H'+'+ ....... H..H...i..H-H ..4-4.-4...~4--4..4..-4-4 ...... 4--4...4-..4--4---4.4.4---~ ....... 4-4,..;.4-.+,4~.~..4...4.:;. ,.-~..4.-.4..4....t-..$..4.,..4...4 ...... 4....4-4....6...4m-b..~.4...4 ...... 4..-;-.;...~..t-..6...~...i....; ...... .6....;...4...4...i ...~.,..6,..4,..4, ........ · --.6---$--*~---~---t---' ...~..-~.--4 ...... · ...~....6...~...4...~...~-..~...~ ....... ~.-.:,.-.~.-.~...4.-.-;..-~-..4...~ ....... ~..-~...~..-,---+.-..;...~...~ ....... ,..~.-.~,--~..-~..-~-~.-.~,..~...~ ....... ....~...~...~-..~ ...,...~.......~ ....... ~...~...m..~...~ -.,-.~.-~-.~ --i-+++-l---t--.;;---~---t ...... H---:;--.-..:---t.--H-+-+.-i.--?H--.t-.-t.-t--?..t--.-.: ....... t---?-t'--t-.~---??-?t--t-"H.---j~.-}'--t-'*;-,t ....... ?f"t'"t-q"+.."'t't't ....... t"'t'"t"'t'"!'"t"t"'ti ---H-H-+---H-t-*-H-H.H-+ ...... ?'--'4'*-H-.;.--4--'H-t'--*4--'+"-t-*.:---H'H-+--'~'*-.;.---9-'+'--+ ....... H-+'--?~---t---.t'---+---~-'-H- r"+'"T.'"~..-~"'~"'T'"f-t"" ",.'~'f.:'"T"T,"'~ "?'"?"'?'"?'" ""?-t"'?"'? ....... ?"T"T"T, ....... 1*"?'"?'"~'"t'"T."'?"'?'"t .... ~'T'T'"TTT"TTi 'TTT'TTTTT'Ti'T'T'TT"T"TTT,T ....... T"'T"'T"T"*!'"T"'T"'T"T";'".:'~t~'.,'"T'"t ...... t'"t'ff"t'"~-t'"?!'"t ...... t'"t'*'t'"t-!"'t"t't""i ........ ':'*'t..."T"? ...... ?'t"'i. .... ..LL4-Li-4...LL~ ...... L.LLL.J..-LLLL.'4*..LLb~4444 ........ L$444444...L ~.-$4.-~q---?:%:.b4....-.~..4-..4 ..... 4...4-..4...$....4444...~..-$...$...$..4.::...-.i4....Li ...... ~.4.--$.-4 -H"'i*"H,'q'"i'"f"i ...... H"*'i'"H'"H'*'i'"! ....... i."'f"i"'?:."i*'"H'"H ....... H"'H-t:"'t'+'?"'"i'~ "q'+'H'"H'"i"i'"f ....... H"'f'+',-"..'"H'"f""+'H"'f ....... H"'H ....... f'"~'"f'"f ....... H"'H .... :::::::::::::::::::::: ::~:::E:E: ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::~::i:$:~:;:i ::i:::~:;$::T~:: :::$::i:::i:::i::: :::i:::i:::!::$:: ...4...bb.i.. bi-. 44-.; ...... bbb-;..H...H.4.~-..;-..4.-..:'.-.b4..-b4---;...~ ........ ;...4.-.H.-.~.~-~.t. l.-u?4--.i4..H.--4...; 4 ....... b4..H...!..H.-H ....... ~.H...!..i.H-H · 4,..4-.4..4 f-;...4- ........ 4. ~ ..... ~, 4 4- .; t , , ~ : ~'; 4--~ ~' -: 4. .... 4 4 -4-- f~'...L ~,. ................. 4-*4 ..... ~ -~,---4---;--44~'.-4.4-.4- .4...6...; $ .4-4...4.: ........... .6..4 ...... f'.4"';'"4,'"f'''~,'''~,'''';''''~ ........ .6"+"f"'+'-'t'".;'-~'"4'"~; ~ ~ ........ .6"'.;"'.;"'~'"t~ ~ ~ ~ ' ~ ~ J, ~"';-;"'.;"4'"' ~+-?~+~?~`j~f~H~H~i~:~:~f~;~`~*``~+~!~;~+~+"~4'''~;~;~- .-.;.---.;.--+.--j,"~--..;---..;.--,.'-.--.' ....... ?'"'?.'"+-ff'-t-±"f'+"+ ..... f-+"f"f-'t";:'--t"-t'"r'""'-t:"'t'"?"'~'"t"'~'"..'"'r'~ ....... v'?'"r"t"']'"r-t.."','"t .... ~..4-.4.-.4.4.. -4--4..J,..- .J. ..... ~ ._~_.4-.4...H.4-...L..4...J, ...... J,...J,...~...~...+i..-4-..~...~...4-... -,4..4...~-'.~...4-..&..+' ..4-..~ ....... 4-...6-.L-..;...~-4...~...4-..~ ...... ~...~...;....;...f...4...~...?'....~......-?;....6 ....... ! ...4..+..;...-~ ........ ,: ..-+...?,: ...... ~,.-f....;...,.' .... · -f-f--t.--t-.?t--f--t-ff ....... f-i-'-f-f-t--f-'~"-t-'f-'q"'t"t--ff---fT'T--f"~'"t"'~-T-T'T-~'"*:.-T"~ ....... T'T'T'T"j'T'T"t'I ....... F"?'"?'"T"'~"','"T."T"? ....... T'T'T'T"I'"T'"T'"T"'T ....... ~"',"T'T""T'T'T"? .... ---f-+--f--f--t-'+-?.'-'-f--? ....... f.~f..f..f.~t..~...?.....f~..!...~...*..~r...+...fT~.:-f~r..r.;~?~T..r..~:-t..r.T..r..,.· ....... r"r"~"-:'T'r"r",'"~ ...... .?'"t"r","T"r"r"~'": ....... t'"r'T"r"i'"T'"r"r"T ....... · 4-- .Z ..; .6 .'., J, ...6....~....;.., 4---4---4--.6---4.-.4.-.H--4---4.-4 ,.-.;.-.4....;..6*--,.--.;-..4...4---4 .... 4-.-4.--4---.;--, '.--.6---.6.-..;---4 ....... 4---.6---4-,-~ ...... b-- ;--.;,,.-.6 ...... .6.*.4,...4--.4 ...... 4,...4...4-..~ ....... 4,..4.,.,,...4,... m.~...d,....~..., -~....~_.~...~..J~4-~...~....;..:4....6".-~...~.-:..~...L~...; ...... .;"...L,1...;...bL~...!.~'.-~...~-4...~...I...~...~...~..-.:: ....... ~-4--H.-!-44.-4..4 ...... ~...';..4.--.;--~...4...44...," ....... ;...4...;...4 ...... ~. ...b ;...; ....... 4...4-..4...4 ....... 4-4'...4-.;-..~ ---~-.$-.-L.-~-.~-,-~...$...~,.-,1 ....... ~...,1...-~...,1...~....~,...,L--L.,~ ..... ~.....L.~,...~....J.....~.~....~...,1..- ...~,-.~.... '~..~-.-.,L.~-..~-.~-,~ ...... -L--.~---~-..,1-.-ll.~-~...~..-.1L..~ ...... '~--~--~..-..~ ..... .~...,[...4-..4-., ..-~.l.,[....J~..4 ....... ]:.4-..4-1.,~ ....... J~...~.....6.-.[ ....... 4--4....J,..-,~---~ · -~.--~-4--~--~ : = : L :--~'- ' : : : -- I' ' ' : ' ' --4-'~-- '--4'--4-~, 4---4--~--~-,--4,'4"--'~-.6- : : "'-~"~"~--:~--"' .'~'--~-- '"?"'???"'.'"*."'?"?'"T ....... ?T"T"?t'"?'"?.""-'"?' T"~' ~ak~."'? ....... T"T"'?'"I'"'t""~-'?'"T'"? ....... ?'"?"'?'"',~ .....]I]]]~ ?.'"~'"t ...... ?'"?"'t'"t"'v"'?""..'"'T"? ....... ?'"?'"?'"~ ...... T"?'"I'"T"~'"?"'t "..'"'?'~ :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: JJlt'''~tlJ'tJ ~JJJt'JltlJ't ....... ~llt JJlJJ'i ...... tJ'JtJllt''JtlJ' ~ri~J~t?i"?'~'"r'r-r'..:. ..... t"t"'t"i ....... ?'t"t'"?-?"t'"t"'? ...... t"i'"t'"t"!"'t'"t'"t"T:. ....... T: ...... T"'T ...... -+-++-+-!--++-+--~. ...... t--+-+-;.-f-+++--+ ...... t++q. ..... i-+-.-+~ ..... e.t-+i..-l-+.t...t---t ........ i--i---t..-t--t-T":...??'["?i-"tm'~-'t--*~'"-:"-~ ....... :'"-:"'?"?" m"-t.'-'t"~ ....... ,'-','"-:"":"'~'-'t'--;:"'f-v' ...L...L..L4.4...L..L4.4 .... L.$..L4J,.-L4.4.4 L4.4.4-..-':-L4-.~...~ L.&.~.4 ...... ~...~...~...~ ...... L4.4...L.~-4...~...;...; ....... [...;....~...-~..4-..;...;--.;...;~ ....... ~...~.4-..; ....... ~..+..;-..4 ....... ,'. ..... ;:..-~..+.-;..4....*....;... ...,1...i.4...&.I...~...i...;...i ....... $....;...;...~...;...i...L..b.;... ...;...;...;...4...4...4...4.-.;...; ....... 44...4..-;...i...b4--.;4 ...... 4...4...4--.4.........4-.4...4...; ...... 4..-;...4...4..-:-.-4-..4...4.1-1~ ....... 4-.-4.--4...4.-.;--4---4.--41--4..-kjjj+.jj~jjl41jjj~jjj~jjjj~.jj4jjlqjj.; ....... 4 J.J;Jl.4J. J J} J J. ~ J J J; JJJ~ il J4 ..... ? ................. :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: "'4"'?' '"~. "~. '"i""}"'~. '"~. "'+ ....... ~.' '"'?"*~. '" .~'"4'*'~"'f "'~*"+ ...... +'"4"* .~"'+"'4"'?'"~.' '"'!''*~. '''~ J' J~ J J J J~ J' J ~J J' ~ J J J~J' J~* J J~ J J * J~ ' J J ~ ....... ~ J' J ~ J J Jt J' J~ J J Jt J J *'~' J J J~ J J'~ ' "~ ....... ~JJJ~JJJtJJ'~JJJ Jj j ' '~''' J~ J J J ~ j j ' ~ TM '"~'"T'"T"~ ...... T'"T"T"T ....... T-?'T'"T ....... T'TT"T ...... T'"T'"T"'T ...... T"'T'"T'"T"'~'"T'"T'TT"F"T"T"T"'T ....... T'"T-...'"'T ...... T"'T'"T'"T ........ ?T'"T'"T ....... T"'T"'T"'T .... m ;;; i;;;; ;;; ;~ i'i; ~ ~;~ ~;~ ~ ~ ~,~ ~ ~~ ~ ~ ~ ~i... .: ~ ~ ..4..L.~...LLLLL.i ....... ;....~...~...~ ....... LLLL -'i-::'"t-t ..... t"t'"'..:'"t'":'";"t'r't'"j'"t"t"'t"t ...... ti-"?'"'f"l"'t'"t"r't"'tllJtJlliJJJtJJltlJ'jJllt'l'tJl~~jj'~ ....... 1''It JJJ!JJJt" il' Jlrl' J~J JJt'JJ~ ...... ~'''~'''~'''~ ....... T'"?"'~"'Y," - 1000 0 1000 2000 ~000 4000 ~000 6000 EAST E L L' W'-21a {23-15 ll-1 ~, ERTICAL PROJECTION SNL, ll80' WEL, SEC 21, TllN, R12E) 221 · 3000 4000 SO00 ~~::'] ::i:::i:::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::~:::] ~-~---~---?i-?-?'-~:]:~:::z: :::~::]:::]:::Lp...Li..~.,:...~...~...~.4.. ~...~...~...i...~ ....... ?...i...t..i...!...~...! .... v--~---~,.¥--r-v---~"'~ ~ ~ ~ ~ ~ $ i ~...~...~ ...... i...~...L~...ki...~.-.i...~ ...... ~ .... ~ ~ ~ ~ ~ ~ ~ ~ ~ ~; ~ ~ ~ ~ ~ ~ TTu i i ...... L.L.i...i., k..i...i...~...i ........ ;...~...k~...~..+...h+..$ .... "~"'t"t'T'i'?F'! ....... !"T'T"!'" f" Fi ~i ,~)~ ~, ~ ...... ~"~'"?~ ....... ?"?"~"'"'"~"'~ ~ ~ "~ ........ ..~....L.~.4..~--.~---h.~- ....... ~---+-'-~--'i"i"i'"i"i"i'''~i'''?~'''i''I''''F'''F'T'''~ ....... ! ...... ~...~...4..4 ....... ~...~..-~---.~ ....... H..+-.~ ....... r'"?~""rT'T"i'"F"~ ~ ~ ~ ~. i ~..~.,.~ ....... ~.-~...~.-~...~...~...~..,¥.~ "t'i"i'"~"-r"?'-F'?" ~'-T'T'TZll!ll.iZi...i...,~ ..... L.~..:i...i...i...!...~....i...~ ....... ~.- ::~Z~:::~:..~...~... ""~"'~'"H""H'"H'"~"""'H':!:::L!...Li:::i;:i:: ::::::::::::::::::::: :::::::::::::::::::::: '.::~:::~...L~ ........ ~~~~' '+'H"'~' ~:j::'.~::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~:::~:::~:::L?-L--hH ....... ~ hH'"~"'~'"~'"H"i"i"i''i''i''i''i ....... :::::::::::::::::::::::::::::::::::::: :::i:::Z:~:::i: ~:::i...LN ....... H...k~...~...~..i...H .... ..L.L.~...L~...~.._;...]~ ....... ~...~-~....h.~--+-.~-+..+.--~ ~--i--i.-.-?--~--'~"i"';"'T"~"'i f"t"t"~"'~ ....... ~'"?'T"~'T'?~"]]]] ]i].i..L.L.I..~...L.i, .i ~...i.,.; ~..4-,~...~....~ ....... ?f"~'"?l'"~'"l'"?'"~ .... ...~...v..~.--7..-7 ....... 7---~---r--'T--r-'7'"r'7 ~ ~? ~ ? ! ~ ~ ~ ~ ~ ~ ~i ~ i ~ i ~ ~ ~ · ~ ~.~ ---~---LH--H-+-~'--:'i"'~"i""?i"i"i"i"i'"' !"~]~ ~ ~~ ~.c~...~..~...?..~ ...... ~...~...~...~. ~...~...~...~...~ ....... ¥.~...¥.~...k...,...?~ .... ~~ .i...Li_L.L..L.i...i ..... i...i...~.-+-+..¥4.-¥-~- ....... ! .... f"i'"t"t"T","T'T'T']Z]ZZ]Z:Z]7.~Z~ZZ]_.Lt..L~...L.$ ...... ~..4,-.~.4 ~..+..~-.+..~ ........ ~"H'-'!"T"~"'f"~'"i .... .... T-'~'"~"T'?'T-F'"~ ...... '~ ~ i...L ]..Li i ..... ~-..i...i-~.-.$...~--¥-~---~ ...... 4 .... l-..???"?-~'"T"t"T'7 ~ r ~ i ~ ~ ~ ~ ~ · ~ ~ ~ ~ .;...~...~.,.~ ....... ~..,~...~...~ ....... +..-~...~...~...,...~,..??~ .... .... ~---??-'t--r'-?'-F'? .......... ?'"T'"r ? ~ ~ ~ ~ ~ ~ ~ i ~...:...i._~...~ ....... ~ .... ;..4...~.-.i.-.~---..-~.-.~--.~--~---~"-+-"~"'~'"? ....... T-'r"?""rl'T'T"l"'? ..... ~ ~ ~ ~ i i L.i ....... ~...i,..i....L..~...~...~...~..,i ~ ~ ~~~ ~ ~ ...... ~...~...~...i ...... ~...~..4...~ ....... ~...;...~.,.~... ..~.-.~---¥-¥-~ ...... ~--+--~'--~'-+'i'"f"f"i ....... i"i"i'"~'T'T'T'T"~ ...... T"?"T'T'... ~...L..i ~ ...... &.L.i...~ ........ ~...~.,.i...~-.. ~'"~'"H"'H'"'?'i"i .......... !"i"i'","'i"'i :t:::i::: ~]~Z~]]ZZ]ZZ]Z~lll~i]:i].~ 4---4--+--4.-+.-~'-+--~'''~''i''+''???'~ ........ i'"t"?Fr"7'"V'"F'? ...... 7'"CL~ ....... ~,,.~...I..,~...~...i,..~..4...4 ........ ~..+.+'+" i..~..~..-~..4...~...~...~-~.--~..~--+-+-+--~ ........ +'~"T"% ..... t'T"7-? ...... T"~ ~ ~ ~ ~ ~ i ~; ...L..~...~..~... ?i"'i"i'"~"-?T'-F~ ............ F"~'"'E~ZO..~ .L.. ~-~-..i.--i.-4---~.--~-.-~:-~ ..... -.+.--~---~..-~--.~ ....... ?-'~"'?"????"T"~ ...... !' ~ ~ I ~ ~ ~ ~ ================================::::::~:::~:::~---t"~"'~-~'"~'"' '~ , ::, ~, ~ ...... ~..........i..........~..~ .......................... .... }'~mh~'i"'i"'!"'! ...... ! ~' ~ ',', ~ i~ i ~ -t,i~ 4 ~...i...i. 4...~...i...~ .... i~ ~ ~ ' ~ i ' ' i i i ' ' , ~ ~ ' ' ~ i i ~ ~ ~ ' : ~ i i i i .i ~-i i ,.1-4. ! ~ ~-'i ...... i-+'?i ...... ~"'T-'T:T' "T"~"', .... ' k~...LN---N---h~ ....... r---H-+--~---H---H ....... ::::::::::::::::::::::::::::::::i ......... ~ ..... .........d ....... , ......................... ~ .......... "T"F'~"T"t ........ T"T"~ ~ ~ ~. ~ i...~ ...... L~...~...&.i...L.&.i...~ ....... ~...~...~.-~...F..f..i...f...~ ....... ?'?r"f ....... T"T"F'T" F-.+--+-+-+-?--~--?-+--r ...... t"'t"r'"F"t"'T"T"t ....... ~ '. ~ ~ $ ~...~..i .~. ....... '--t"-t-'-t---~'--t ....... T"T'T"~ ...... t"~ ~ · ' ! ~ i ' ' '.' ...$...~..~ ...... i...~-.~...i ........ ~..+.+..~ ....... ?T'T"~'" ...... ....... , &~-4.4...~..4.4--4--~ ...... F-~-++--~---H---?-t'--'~X ~'~~,.-N...~4:~"' .-.~...~-.+..~ ...... ? H'"t- ~ ~ ~ ~ ,.. L. ~ z 4...:...~.-.~...~..-~----~..+-+~--..~~{"':'"~ "T"~"'~'"T'~ ...... T"?"T'T ~ L.i..?...L..~.4-.~.....~-4...i.-i ........ ~..+-+...~ ...... ~...?~...~ ........ t'"?"?" ~'"~'"~' ~ ~ ] ~ ' ~. ~-..i..44..~.-.~-~-.- ~-i'~'z~ ~"'~:77:Z:: ..Li...i...i..~...i...$...i-i...,~~--{ ...... ~-'~"'~'"~ ........ t"t"~'"~'" '"t"'t"'t'"?" '77: ~ ~ .L: 7-T"~'"~"'l'-i'"i ~ i L.z. ,...i...i.~i .......... ~...~...;-.4.-.~---~.--%.~--. ~ ~-? ~ i ~ ~ ~ ~ ~ L..i i ........ ,..4...~...~+.4...~-i-~......+..~..+-+ ....... ?"T'T"~ ....... t"'T"?~ .... ~--.+---?--?-t-r--~ t"'T"i ! I i ~ ~ ~ ~ i L. ,._i ' ... .+.-~ :---~ ~ .... ??"?~"T'T"T t 7 ~ / ~ ~ ~ ~"'~'"~'"~"'"'-~'"~ ~'"~'"+"-?X'"'~'"~'~"- ~ 't'"t'"¥'~'"~ ~ ~ ~ ' ~::: ~ ~ ::::::::::::::::::::::::: '.::Z:i::~:::[:~::.~:..&~...&,,.~...~..-~4..~...~..~.-.~...{ ....... ~.-.f+'f"~'"~'"~'"~'"~ ~ L.LLLLL.L~L.....L..LL.L~...~---LLL: .... -' ~ ~ ~', ' ~!~ii~il, ~,~ ~.~ -..~...~..:~,~ ~, ...... ~ ........ ~...,...+...,...~..,~,?.~ ::::::::::::::::::::::: ~-.4--4..4.--~--.~-.-~.~--::--'}'"~'"{'"f"{'"f"?'f"{ ........ ~-'~"' t .... ~' ,''''-'..-~'--~--'~ ....... '"'""~'"' ....... ~'"' ............... '""'"'"'""~'"'"'~'"~'"~ ~ ~ ] ' ~ ' ' .B : ..~..i~.d.~ ..... d ~ ...... ~ ....... ~''i~mi''i''''i'l~Bl'?'i'l~ ........ h.!.--i-'-'~'i"i"i"i"i'"~"'T""'?"T"T'T'T']...Li...i ...... i...i..$..i ....... i...i...i...l ...... 4...4.4-..4..i...~...~..i..i... :::::::::::::::::::::::: $"'$'"$m'+"h~'"~'~ ...... ~~:'! ...... hti'"~'" ~--~ ~?'¥"¥ ~ ...... ....... 4---~---H..+--~ ~"-?'~""~ 'i '"Yi'~?'" :" .i..-4--+-+++-- ?f"r-r"~"T'T~ ..... T"~ ~ i....L..L..i-~...$ ..... ~ ~ ~ ~~.~ ~.4...~..4~.~.-~ ...... H...~'"~ ....... ~'"~ ...... ~...~...~ ....... ~..+.+.+.¢..?~-.~...~ ....... rT~~ ~ :~"f"f"?'~"-?" :::::::::::::::::::::::::::::: '.:Z::~:::~:::~.4..-~---~.-4---~ ..... ?--~---,'-'r'~'"~'"~T'~ ~ ~ ~ ~.~_.~ ...... ~...~...~...~ ....... ~...~ ....... ~ ....... ~...~..., ........... ~"-?~'"~'"~ ~ ~.~~ ~ ~, .. ~-~ ~:: '. ~ ,,, ~~.i...r-'... ~...~ ....... ~..+-.~...~... ~ ~ ....................... ~'"~ .... ~- ~ ..... ~ , ~ ~ ~' ~ ~..i...i...i ....... ~...i ....................... · ........ ............................. ~"'?"~'"~'"?" ~: ]':~ Z:TZ'. ZZ]Zi]Z :]ZZ]~:]Z '.]:..i...i...i ....... i...i...i., i..~.4..4...~...~... H---~ ...... ~'"~'"t"~T~"'~"'UZ~...Z.'L~...~ ........ ~...~...~...i ...... ~-.~...~...~ ...... ~...~4...~ ......... h.H...~ ...... ?i'"~ .... +'+"~ ...... ?'~-l'"F' ~ ~ ~ ~ ~ ........ · ~-'-i' ~ ~-.-4-"-h-~"'+"'~"~'"'h'~" ~ .... + .- ,...+..+"+'4 ........ +'"+"i"" ...... '""~'"?'~ ...... ~"'?'?":'"~'T'?''~'' ~ ~. ~.~ ~. ~...~_ ....~..j...~...~ ........ ~...i...i...~ ....... ~..J..+..~ ....... .... h-+.-+...j ...+......+"+ .... +.+-+..,-.+--.i--i--i..~--.r-',,,: ~ ~ ....... i...i...~...i ....... ~...&.~...~...~...4..+..+...4 ....... +-..+...f.-i... --i-::i-::(::'f'::~::Z:: ~:Z: :J:::+::J:::~:~:::::J::-~:::~:-~---i---(--4.--~-..~ ..... .¥.~...~...'m.~...+...~-..~-,----?-?'~ .... ?'~'"~ ...... ~'"?"~'"~ ' '"'""' ....... ~"'~'"'~'"~ ...... ~"'~'"'"'~ ....... ~"i'"+'"~"' :i..~..Li-~..J,.. ~--'~- '+4'"~"+'+"~'"':'~"'?'?'T"i"'t"i"'F~:' +-.4.--~ ..... ~--.~--i--i.-?i-t-i-'-i-' ?'FT"F~"T"~"'CF' Li.' ' -.J~- -~-- ...&.~.--~...?--4-- ~---~ H---H'"H'" ~i"'!'"i"T'T"l ..... ~)) ~',~~-~ t~?~7 ~ ~ ~ ~..L.L...~ ..... h..~...~...~ ........ ~...i...~....~... ~~. ~ ~'~)i ~- ~ .z...,...~:Z...Li .... ~..-~---?.~-.H-...?--i--?H'--i'::!:::: ::::::::::::::::::::::::::::::::: :::~:::~:::~::.~ ....... ~....~...~...~ ....... ~...~...+...~ ....... ~...i-i..-f.. · --H-'-??i:: Z:]: :::::::::::::::::::::::::: :~::.-L~.-.L-L~.--H---~--, -i--.?-.~ ...... ?"~'"?"?'J:'?'T"~' ~.. L~...~-.I.-.~4..~ ~ ....... ~...~"'~'"+ ....... ~...+...k+ ....... H'"?i ....... ~"'?'~"'~'" :::~:::~:z::~:: ::i ~....~..4+~.++..~ ..... ~-++--?+-~---~---t--~ ..... ~":~:::~:::::::::::::::::::::::::::::::::::::: ;..~.4 ...... ~....)...~...~ ....... ~..++.~....'.zm?+ ...... !...~::...~...~...t..~ .... .... ~...~..~...~_~.~. .~-~ 4.+++-H ...... ~'-'H"'~"1'"~-'i"'i'"i"' ::~::Z:~:::::~::7...~...~-~.~.+-H-::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: .... i._&.~..j...L-L .~---4 -4--+-+-+-.!---.) ....... ?--~-'r-t"','"l-T'T'T" .,: ~:::~:::~:~: :i:::~ ::::::::::::::::::::::::::: ~~::: ::~::?::~:: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::i:::7~::.~....~::: ~"~-' ~ ~ ~ :~,..~...~.+.~...:...~.+.~.+.H..-H'+' "'i'"~'"'~ ...... ~'"t?"¥Y'?"~X.] .Z]...~...Li....~...i-...~ ....... ¥+.+-.~...l..~..+.i."i ....... ~'"?'i'"!"'l"~ ........ ?"~'" :::::::::::::::::::::::: ~:::~ ~:::~::i:::~:.~...~.+-..--H..-H.--H-~-.-H-: "'~'"~'"~ ...... ?"?"~"'?'r"~"?~ ~ ...,....~...d...~..~...~....~ ....... ;..~.-.~...~...~...~...~...?, ....... ??'","'~'"?: .... ...i.-'f--i ...... I'"~"'I"TT'T'T"i"T' ~L.L...)...L...&.L.~ ........ L..i..~...~...~...~..~..4...4 ....... ~...~-..?'..i'"~'-?r'"~ .... "~i"'i'~i'+-~ "~"'~ ~'"i"'?'?""'"?"?"~-~"'~'"~-?'??' ~~TT ~ ~~...~...~ ...~...&..L...L.I..-~ .~..J h+-+-+-+--i..-i ....... i ? ~"'T"T"i''~ ~ ~ ~~ .--~-4---m~ ...... ~'''~m++i'++''?'~' ~:7:::':::::::::::::::::::::'''U'''~'''~ ....... ~....~...~....~m.~.''~'m'~'''~'''~ .... -'~'"!-~ ~ .... $...z..i...~...~...~...~ ...... ~...~..+.+.+-+-+.+.-+ ...... f--i'"! ...... !'"'?'"k! ....... i' i 'iZi: :::::::::::::::::::::::::::::::::::L.~..4...~..4 ....... ~..-~..+..~...:...~...~...?'f"i'"!'"?'i .... .... ...... ........ ....... ....... ...... .... . :. :::::::::::::::::::::::::::::::::: ,_,..., ...... ...... ?..,_,...,. ~ ~)F i..~ .L..~ ~....L..~...J...~...J...4...~ ...... ~..4..+..+ ........ ~'"i"'i'"i ...... i'"~"T"! ....... i"'I"T'T" ~ ~ .... T"~"'T".'"?"T"~'''?' '.].:.LL.~ .... i...$...i...:...i-.-i..+..~ ...... ~..+-+"+ ........ i'"+'"i'"i'"m'"i'"t"?"~ ...... ?"~"T"~'" R :;: __ 6000 41. PROJECTION ON VERTICAL PLANE 41. - 221. SCALED IN VERTICAL DEPTH~ HORIZ SCALE : 1/1000 IN/FT BP EXPLORATION TO: HOUSTON ARCO CHEVRON EXXON TEXACO MARATHON BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Oaq`e: 04-20-89 T~: 79993 MOBIL PHILLIPS GEOSCIENCES '. REFERENCE: ARC::HIV-ES B~. 'OPEN HOLE FINAL LOGS The roi lowing maq`erlal Is being submH-~ed herewith. Please acknowledge recelpq` by signing a copy of q`hls letter and returning lq' q`o this office: Hou/uNIT/~T~TE: '- W-21 MWD GR/RES Plus Directional 03-25/04-15-89 #17 Teleco Job#691 2" 'TVD 9740 -11483 W-21 MWD GR/RES Plus Directional 03-25/04-15-89 #17 9740 -11483 Teleco J'ob#691 5" TVD W-21 W-21 MWD GR/RES Plus Directional Teleco Job#691 2" MWD GR/RES Plus Directional Teleco Job#691 5" 03-25/04.-15-89 #17 9740 -11483 03-25/04-15-89 #1~ 9740-11483 STATE ONLY: Magnetic Single Shot Directional Survey GYrb'scopi. c D ir.et t ional ':Survey ': Date: Job#: Date: Sob#: Rece I ved Shirley R, McCurry I NFORNAT I.ON CONTROL Ne I I Records LR2-1 BP EXPLORATION TO: HOUSTON ARCO ,,, CHEVRON EXXON TEXACO MARATHON MOBIL BP Exploration (Aleska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (9O7) 561.6111 Date= 05-08.-89 , , 80040 PHILLI~.S GEOSCIENCES '. REFERENCE: ARCHIVES B~E'OPEN HOLE FINAL LOGS The following maferlnl Is being subml'l-fed herewith, Please acknowledge recelp% by slgnlng a copy of th ls le~-fer and returning It to~hls offlce: 'hOU/UNIT/:STATE: w-21 EWR/GR 04/12-16/89 ~/2-6 10265.-11514 Sperry Sun ,W-21 FDC PORO 04/12-16/89 S/2-6 10265-11514 Sperry Sun 5" 5" EIV, STATE ONLY: Magnetic Single Shot Directional Survey GYr'dsco. pi.c Directional ':Survey" Received Da~e DIRECTIONAL SURVEYS Date: Date: JobS/; JobS/: ; ; Shirley R, McCurry I NFORNAT ION CONTROL Wei I Records LR2*I BP EXPLORATION May 30, 1989 C. V. Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive BP Exploration (Alaska) Inc. 900 East Benson Boulevard Anchorage, AK. 99501 S~-~L--~ Dear Mr. Chatterton: j~r~r~~, BP Exploration is requesting a~inistrative approval, a~/ Conservation Order No. 213, Rule 2, to waive productivity profile requirements for new Prudhoe Bay Unit well W-21. The waiver is requested because the well is a high angle completion of 82". The completion intervals are as follows: RO. Box 196612 Anchorage. Alaska 99~,~ (907) 561-5111 ,~9 1 coJt,l~--~2.E.~r v 10,850-10,950'MD (100') 10,975-11,140'HD (165') 8,910-8,925'ss (15' TVD) 8,929-8,954'ss (25' TVD) If production characteristics would warrant evaluation for remedial work, production logs would be obtained at that time. Because all production logs would be coiled tubing conveyed, there is an increased risk associated in obtaining them. If you require further information, please contact S. L. Bryant (907) 564-4203. Very truly yours, TBG:SLB:BWB:bwb cc: R. E. MacDougal (Exxon) D. F. Scheve (ARCo) D. D. Smith (ARCo) RE 6.1 RECEIVED JUN o 989 Alaska Oil & Gas'C°ns. Corflr~lsslOrt Anchorage BP EXPLORATION ARCO © BP Exploration (Alaska) Inc. ~00 East Bonson Boulevard RO. Box 196612 Anchorage. Alaska 99519.6612 (K~) sm.sm EXXON Date: 05-08-89 ;EHILTL.]~ S . . ,~: 80042 STATE 0F ~ SYSTEMS (Transmittal & TaPe) , , BP MAGNETIC LIS TAPES & LIST~GS ~he following mterial is being ~tted herewith. Pl~e acknowle~e re:eipt by signin~ a cc~y of this letter and returning it to ~ office: / W-21 OH/MWD w/.Lis 04-28-89 ~/6 BAROID MWD SOA~/ 89-04-03 1600bpi TP~/ 06456 10120-11514 API~! 50-029-21929 R:EPLAC'EMENT Gas Cons. Commission Anchorage * EL~ON: An Asterisk (*) next Co a listing above means you should have received the Tape(s) and Listing(s) direcCly from the respective service company. Plaase confirm this. Date Shirley R. McCurry Well Records ~2-1 MWD WELL LOG TRANSMITTAL TO: BP Exploration Inc. ATYN: Jennifer Dietz, LR2-3 P.O. Box 196612 Anchorage, Alaska 99519 RE: LIS Tapes - Prudhoe Bay W-21 The technical data listed below is being submitted herewith. Please acknowledge receipt by signing and returning a copy of this transmittal letter to this office at the attention of Mr. Erik A. Opstad. Digital Data: 5 LIS Format Tapes @ 1600 BPI (FORMAT CORREL'~D) 5Tape Verification Listings Oj~C~/V~~ rafiOa-tflc.- Date Alaska 011 & Gas Con& Commission Received · Anchorage 8537 Corbin Drive (99507) · RO. Box 231649 · Anchorage, Alaska 99523 (907) 267-0200 · Fax (907) 522-3432 A Baroid Company BP EXPLORATION BP Exploration (Alaska) Inc. ~00 East Benson Boulevard P.O. Box 196612 AnChorage, Alaska 99519-6512 (907) 561-51tl To ARCO EXXON OF ALASKA Date: 05/18/89 T%: 80070 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING · The following material is being submitted herewith. Please acknowledge receipt-by signing a copy of this letter and returning it to this office: OH/MWD/Mag Tape 03/06/89 Teleco%TAK691 ],600bpi 9325-11830 TP% 06465 API~50-029-21929 Z-21 OH/DIFL/BHC/CNL 05/07/89 #- 7810-11432 TP) 06466 Atlas Ecc~3812 1600bpi API~ 50-029-21938 Received: Date: Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION F.~xON BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561.5111 Date: 05-08-89 PHILLIPS ~: 80042 , SYSTF~MS (Transmittal & Tape) ARCMIVES · BP MAGNETIC LIS TAPES & LISTINGS The following mterial is being submitted herewith, Please acknowledge receipt by signing a copy of this letter and returning it to this office: W-21 OH/MWDw/.Lis 04-28-89 #6 BAROIDMWD SOA# 89-04-03, 1600bpi TP# 06456 10120.-11514 API# .50-029.-21929 .. * E~L%ON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company, Please confirm this. Received ~~--~~~~~% Shirley R. McCurry Alas~ Oil & S~s Cona Co~issio. Anchorage . BP EXPLORATION HOUSTON ARCO , CHEVRON ~loral~on (Alaska) Inc. gO~ 8enson Boulevarcl P.O. Box 198612 Anchorage. ~laska 9951~6612 (9o7) ssi-s111 EXXON TEXAuO MOBIL Dal'e: 04-28-89 80020 PHILLIPS STATE OF ALASKA GEOSCIENCES RESEI{VOIE REFEEENCE:: Bp'CASED HOLE FINAL LOGS The roi lowing material Is being submitted herewith. Please acknowledge receipt by signing a copy of This let-ret and returning It to this office: R-06i LEAK DETECTION/TEMP 04-21-89 GUN POSITION RECORD 04-21-89 CET 04-20-89 ~L.~! CNL 04-20-89 z-01 PITS 04-22-89 #1 3500-9230 Sch 2"/5" #1 9498-9798 Sch 5" #1 9514-11376 Sch 5" #1 9513-11333 Sch #1 10450-10800.Sch 5" Rece i ved Date .o Shirley R. McCurry I NFORMAT i ON CONTROL We I I Recor~ls Li~-i BP EXPLORATION BP Exploration (Alaska) Ino. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99619-6612 To ARC° EXXON PHI LLI PS STATE OF ALASKA SYSTEM Tape & Transmitta,,!' Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Date: 04/18/89 Ti: 79982 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter 'and returning it to this office: z-32 OH/DIFL/BHC/CN Raw Data 04/12/89 #- 7632-11340 TP~ 06443 Atlas%3786 1600bpi API#50-029-21924 Archives Only: ~:~ OH MWD field tape NL Baroid#890403 04/18/89 J- 10100-11517.5 TP% 06444 1600bpi API~50-029-21929 Date: Information Control Well Records LR2-1 J. Dietz/S. McCurry MEM ~O RANDUM~ -' St.ate o f A la s ka ~ ~AS~ oIL A~ GAS CONSERVATION COMMISSION . TO: L~+e C. ~ch DATE:AprL1 13,1 989 Commiss£oner mLENO: D.BDF TELEPHONE NO: THRU: Michael T. Minder ~-~.~f~. SUaJECT.. Sr. Petroletm En~neer Bobby D. Petrole~ Inspector FROM: BOP Test BP PBU W-21 Permit. No. 89-32 Prudhoe O~1 Pool ~es.d_ay,~ .Mar.ch.e. 28,_..!98!,_ The ~es~ began at 6530 lm and vas completed a~" 9~'O0 '~' -~'~ t:~eii'~a~-.ached BOP l:est report shovs there was on ~a£1ure, wh£¢h ~as repaired and ~ested ok. In suamary, I witness, ed the satisfactory BOP test on BP Exploration W~21. Attachment 02-00!A (Revi 8/85) 5/84 °o · o, · ©. STATE OF ALASKA . ALASKA-OIL & OAS CONSERVATION COItHISSlON B.O.P.E, Inspection Report Ins ~ . ,, ~ .~ · ,. L, ,, , Location, General~gell Siga~ ACC~LATOR SYST~ Eese~ve Pit ~~ pressurn lfct~ Closu~! /'~~ _ psig .... Nud Systems Visual tud'io Pump inc~. clos. pzis. JO0 psis -- ni~ see. Trip Tank ~ . Full Charge Pressure Ac~ained~ ~, ~in{~ sec. Flo~ Honitor : _ - ~ Controlsl Haster Gas Detectora ...... / ....... ._ , , , l~mote~~. , , ........ Blin~s s~itch cover.~~ . ., Kelly and Floor Safety Valves . ' BOPE ~cack Test Pressu:~ UPpe~ Kelly. ] Tts~ Pipe R~ms ' ~ /,~~ Ball Type ,., /:- Test Blind Rams . . ~~/~~ . Inside BOP ~ Test Pressure ~/~~ Choke Line Valves ~/~~ .... Choke Hanifold~~ T,sC Check Valve ~ ~/~ Adjustable Chokes_ ~ . -. ,, ~ydrau!q~l!Y ope~tld ,~hoke ,/ Test aesulcs~ Failures / Test Time~'ff~ hrs. · Repair or Replacement of ~ailed equipment to be made vi~hin --. day~ and Inspector/ Co. ission, office notified. ~ ~:4~ .~~' · ..: . ,. - , _ _ ..., Distribution orig. - AO&CCC ce -.Operator cc - Supervisor Teleaop.y, (907) 276 7542 No. 89-32 no~. 626's . 1180*b~lL, Sis. 21, TIlN, R12E, Uti. ~. 2417'SHI., 3228'~, See. :L$, T~-IS, P~12E, t~. ~eloaed Ks Ch approved applie&ctou for permtc Co drill che above re~erenced ~<t. The pe. rm~ ~o dr~I1 .does not exeup~ you from obcaintn~ add~Cional ~e'~Cs. req~~ by ~ ~r~ o:c~r $~e~ucaZ, aS~e~eo, and ~$.~c- aut~r~se ~d~Cing ~i1~ ~eract~o '~tl all ocher r~u~ed pOPcOrnS, de.~e~~c~s are mdc. Chairman o£ Alaska Oil and ~s ConservaC{on Coun~ssion BY 0~ OF THE C~SSl:ON ~clos~e e.e,- Depa~.~.~ o£ F~h & Game, liibtcac Section v/o encl. Dep~~e o£ '~viro~tal Conservacton w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 13, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn' Mr. C. V. Chatterton Well w-2.1 (23-1,f,-11-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to drill the above-named well. Also included are the attachments noted on the permit form and our check in the amount of $100.00 to cover the permit filing fee. Yours very truly, PBU Drilling Engineering Supervisor TOS/KTH CC' Susan Leach Well File .REEEI..V. ED " ~IL STATE OF ALASKA ~ · ALASKA AND GAS CONSERVATION CO ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrillr'lllb. Type of well. Exploratory'r-I Stratigraphic Test O Development Oil E] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 21' Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool J~/= Exoloration 92 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0.. R~)[ 196612_ Anchoran~_ Alaska ~§$1~,6612 ADA '28263 4. Location of weil at surface 7. Unit or property Name 11. Type Bond(,so 2o Mc 2s.o2s) 626' SNL, 1180' WEL, SEC. 21, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 3163' SNL, 3919' WEL, SEC. 15, T11N, R12E W-21 (23-15-11.12) PBU 25100302630-277 At total depth 9. Approximate spud' date Amount 2417' SNL, 3228' WEL, SEC. 15, T11N, R12E March 21, 1989 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Numbe~ of acres in property 15. Proposed depth(MoondTVD) p ropoj~tl~/.' line 47451 3228 feet W-22 35 feet 2560 11451'MD 9079'TVOfeet 16. To be completed for deviated wells 17. Anticipated pressure (,. ~o ,~c 25.o~s (~)(2)) Kickoff depth 4soova3~5. feet Maximum hole an~lle 42/800 Maximum surface 3330' pelg At total depth (TV•) 8800TVDee/4007 pslg 18. Casing program Specifications Setting Depth size Top Bottom Quantity of cement Hole Casing Weight Grade coupling Length M D TVD M D TVD (include stage data) 20 . Cond. Surface , .... 1,.7-1/2" 13-3./8" . 68# .L-80 B~. . . 2650' Surface 2680' 2680'. 3840 cu ft Cold Set II 12-1/4" 9-5/8" 47# L-80 NSCC 10002' Surface 10032' 8773' 21~2 cu ft Cla$,~ G 8-!/,2" 5-1/2" 17# L-80 TC4S 1579' 9872' 8700' 11451' 9079' 638 cuft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor J ECE!Y. ,D Surface . Intermediate Production M~E ']. ~ Liner , Perforation depth: measured ~~~_~~-- true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] D.ri.llin~l fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report• 20 AAC 25,050 requirements [] 21. I hereby c~fy~foregoing is true and correct to the best of my knowledge Signed ._~~~ Title PBU Drilling Engineering Supen/isor Date 3///~/o~ '" [ / ///" Commission Use Only / / Permit Number IAPI number IApproval date See cover letter ~ ~ -- .~.2_ J5 o- ~ z.~ - ;z. / ~, ~_ =~ J 0 ~ / ! 7 / 8 9 for other requirements Conditions of approVal Samples required [] Yes .,'~No Mud Icg required r'lYes '~ No Hydrogen sulfide measures [] Yes ~ No Directional survey reqmre(I ,~ Yes [] No Required Other: ' Commissioner commission D Approved by L/,.~'~, ( ~-~~,~'~j~ ~ne Form 10-401 Rev. 12-1-85 -"'--'* / / Subrr~ irf/tripXcat~ PROPOSED DRILLING AND COMPLETION PROGRAM WELL W-21 [23-15-11-12] PBU Install and cement 80' of 20" conductor to surface. The Drilling fluid program will consist of an 9.5 ppg spud mud in the 17-1/2" hole, a 9.5 - 9.7ppg water base mud in the 12-1/4" hole and a 9.5 ppg water base mud in the. 8-1/2" hole. Drill 17-1/2" hole to 2700' and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4007 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point at the Sag River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and cement using Class G cement around the 9-5/8" shoe. Directionally drill 8-1/2" hole to TD. Run 5-1/2" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to 9.6 ppg. filtered NaCL completion flui'd. Test easing and lap to 3000 psi. Run CET/CBT and GYRO. Perforate with rig on location. Run 9-5/8" production packer on 3.5" tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Tubing Size: Tailpipe Size: 3-1/2" Tailpipe NOTE: Perforate with rig on location SAL:3/9/89 3-1/2", 9.2# L-80 TBG with 7 GLM's. RE Eii ED MAR ! ', ~Uas~.Oil & Gas Cons. Commission PROPOSED DOWNHOLE DIAGRAM WELL W-21 [23,15-11-12] PBU/EWE PROPOSED DEPTH BKB 20" Conductor Ball Valve 110' 2100' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 2700' 3-1/2" 9.2# L-80 TDS' robing with 7 GLM's 9-5/8" Packer 9518' 5-1/2" Top of Liner 9872' 9-5/8" Shoe 12-1/4" Open Hole 10032' 10042' 5-1/2" 26# L-80 TC4S Liner 5-1/2" PBTD 5-1/2" Liner Shoe 8-1/2" Open Hole 11451' 11451' 11451' 3-13-89 B.O.P. STACK CONFIGURATION 1 3-5/8 IN. TRIPLE R'X'M STACK 5000 PS1 WP DRILLING ANNULAR PREVENTER Z IN. KILL LINE GATE GATE PIPE RAMS ElL IND RAflS DRILLING SPOOL ! ! PIPE RAHS I 4 IN. CHOKE LINE HAND HYD. ASST. GATE GA~'E ]gECEi.V. ED MAR 1 1 NORTH WELL N' W' 21 -- SURFACE LDGATION LAT. - TO° 17' S5. lC4" LLONG- · 149° 05' 3~. 217 · 1' = S~ 959~ 651.13 A.S.P. X · 612 ,049.07 ZONE 4 626' 1180' FROM N. LINE SECT. 21 FROM E. LINE SECT. 21 © 0 CERTIFICATE OF SURVEYOR: II _ I HEREBY C~RTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS Pt. AT REPRESENTS A L. OGATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. '-*~a'vt'~a'~'~/ NOV. I~, SG SURVEYOR DATE: SHEET I OF 2 .WELL PAD ' W ' -- WELL N° W- Zl AS-BUILT. · LOCATED IN PROTRACTED SECT. Il t T. II N. t R. I~: E. ~ U.M. SURVEYED FOR : ~ ALA, SKA I:~ODUCTION ~,0 PREPARED. BY : KUUKPIK - TECHNICAL SERV. INC. PRUDHOE BAY OFFICE I I I I I I I DATE ~ NOV, 15, eS B~AWN BY: D.T. CH KD. BY; ILK II I I T. II N.,R. 12 E.,LJ.M. WELLS w31 · w3o · w?.? · wze · ws9 w4o w41 WELL PAD "W" SCALE 1"-400' WELLS w2¢ w2S w2o' wi9 wi7 wi8 wi4 wis REV. 8/0Z/88 JJC REV. 5/18/88 JJC 17_/08/87 JJC 16 15 21 22 ~ OF WELL PAO LEGEND · EXISTING CONDUCTOR BOX Q FUTURE CONDUCTOR BOX {AS STAKED) "W" Loc ated in PROTRACTED SECTION 21~ T. I IN.,R.12. E.~UMIATMERIDIAN~AK. Surveyed for STANDARD ALASKA PRODUCTION CO. Surveyed by KUUKPIK TECHNICAL SERVICES~ INC. ANCHORAGE~ ALASKA (907) 561-52-57 _$45DUA124:[DRAN013]W21_CLOSAP_SHORT7.LIS;3 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: W-21 [23-15-11-12] Location = W-E S-N TVD(SBS) Top 612049.00 5959631.00 -92.00 Bottom 614713.27 5963452.33 8987.98 8-HAR-1989 ----- Closest Approach Analysis --- Date: 8-MAR-89 Time: 16:03:42 Note: All depths in feet Below Kelly Bushing (BKB) 16:03 Page Closest Approach WELL IDENT /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART CLOSEST DISTANCE A029-2052400 MP1511 8317.6 2649.7 8631.5 6237.3 858.2 A029-2180800 w-20 10'.0 0.0, 0.0 0.0 35.0 A029-2183300 ,~W~24 516'9.8 100.4 5159.7 26.5 37.8 A029-i185600 W-17 10.4 0.0 0.0 0.0 140.0 A029-2186900 ~!W~2,:2 471,9.4 10.9 4709.7 22.8 6.1 A029-2188000 W-18 9.7 0.0 0.0 0.0 106.0 S UtiNARY The well which cones closest to the proposed well is: A029-2186900 W-22 Closest approach distance = 6.1 feet KICK OFF for this run = 4500.0 feet Vertical /PROPOSED\ TVD DEPART 4771.8 16.6 Intersection /NEARBY\ TVD DEPART 5135.8 23.4 VERTICAL DISTANCE 373.7 _$45DUA124:[DRAN013]W21_CLOSAP_SHORT.LIS;5 Search Radius= 200 COURSE LINE For proposed well: W-21 [23-15-11;12] Location = W-E S-N TVD(SBS) Top 612049.00 5959631.00 -92.00 Bottom 615159.11 5963099.15 8987.98 8-HAR-1989 --- Closest Approach Analysis --- Date: 8-HAR-89 Time: 16:01:32 Note: All depths in feet Below Kelly Bushing (BKB) 16:01 Page 1 WELL IDENT Closest Approach /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART CLOSEST DISTANCE A029-2052400 HP1511 8290.2 2624.9 8707.3 6323.1 1123.4 A029-2180800 W-20 10.0 O.0 0.0 0.0 35.0 A029-2183300 W-24 5150.3 94.8 5140.2 26.4 49.7 A029-2185600 W-17 10.4 0.0 0.0 0.0 140.0 A029-2186900 ~-22 4712.6 10.1 4702.9 22.8 7.4 A029-2188000 W-18 9.7 0.0 0.0 0.0 106.0 Vertical /PROPOSED~ TVD DEPART Intersection /NEARBY\ · TVD DEPART VERTICAL DISTANCE 4920.7 39.3 5286.5 26.9 375.5 5090.7 77.5 5434.6 56.5 353.6 6139.6 684.3 6651.0 658.7 521.1 SUItMARY The well which comes closest to the-proposed well is: A029-2186900 W-22 Closest approach distance = 7.4 feet KICK OFF for this run = 4500.0 feet 4 ' RIG 3 MUD SYSTEM EXISTING ~ ~ *--.. · &IUDPITs~ ~ ~ ~ '---... ",45 IS" t I I ALASKA UNITED DRILLING INC. RIG 3 MUD SYSTEM DIFNN. IY DATE October 1987 SCALE NTS ALASKA UNITED RIG NO. 3 MUD SOLIDS CONTROL EQUIPMENT 1 - Brandt Dual Tandem Shale Shaker 1 Demco 6-12" Cone Shale Desander 1 - Demco ,416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1- Tri-FIo Horizontal Vacuum Atmospheric Mud Degasser 1- 200 gpm Operating Capacity-Centrifuge 1 9- Brandt MA5 Mud Mix Agitators 1- 125 bbl. Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1- Drilling fluid flow sensor with readout at driller's console 1- Cavium Dewatering screen assembly MUD WEIGHT CALCULATIONS WELL W-21 (23-15-11-12~ Mud Wt. (8-1/2" Hole): 9.5 ppg. P Sag River: 4090 psi. at 8600' TVDSS P Sadlerochit: 4007 psi. at 8800' TVDSS P Top Sadlerochit: 4025 psi. OB Sag River: OB Top Sadlerochit: Current GOC: 190 psi. 346 psi. ABOVE 9-5/8" Casing Pt. Top Sag River Top Sadlerochit 8773' TVDBKB 8777' TVDBKB 8917' TVDBKB Cement Calculations 13-3/8" CASING Measured Depth: 2680' Basis: 2 X Annular volume Total Cement Vol: 3840 (cuft) 3000 SXS Lead Slurry Vol: 1920 (¢u ft) 1000 SXS Tail Slurry Vol: 1920 (cuft) 2000 SXS 9-5/8"CASING Measured Depth: 10032' Basis: 90% Annular Volume to 13-3/8" + 50 cuft Total Cement Vol: 2030 (cuft) 1345 SXS Lead Slurry Vol: 1537(cu ft) 845 SXS Tail Slurry Vol: 585 (cuft) 500 SXS 5-1/2" LINER Measured Depth: 11451' Basis: 1.5 X Annular volume to 9-5/8" shoe + 150 cuft Total Cement Vol: 638 (cuft) 542 SXS SAL:3/9/89 (2) Loc APo__ (2 thru (8) (3) Admir (9 thru 13) (10 and 13).. (4) cas - V-sV (14 thru 22) (5) BOPE ~.~ (23 thru 28) (6) OTHER rev: 01/30/89 6.011 1 Is the permit fee attached ' · ®·~e~·e'~eleeee®eeeee·eeeeee®eeee~··eeeeee 2. Is well to be located in a defined pool ............................. ~ . 3. Is well located proper distance from property line .................. ~ 4. Is well located proper distance from other wells .................... .. . 5. Is sufficient undedicated acreage a~.a!lable in this pool ............ ~ .... 6. Is well to be deviated and is wellbore plat included ................ ~ 7 Is operator the only affected party ~7-- ..... · ·e®e®e·e®·······e··®·······e®···e 8. Can permit be approved before fifteen-day wait ...................... ~ '". · 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Lease & Well No. YES NO REMARKS _ Does operator have a bond in force .................................. Is a conservation order needed ...................................... T is administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... '~. . Is conductor string provided ........................................ ~ Will surface casing protect all zones reasonably expected to serve as an underground, source of drinking water ..................... ~ ,, , Is enough cement used to circulate on conductor and surface ......... ,~ Will cement tie in surface and intermediate or production strings ... ~ ... Will cement cover all known productive horizons ..................... ~ Will all casing give adequate safety in collapse, tension and burst., z~ Is this well to be kicked off from an existing wellbore ............. ... ~ Is old wellbore abandonment procedure included on 10-403 ............ ,, Is adequate wellbore separation proposed ............................ ,,~!~? Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams amd descriptions of ~a~-~~BOPE attached· Does BOPE have sufficient pressure rating - Test to~_~psig .. Does the choke mamifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. exploratory amd Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. INITIAL CEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SBORE Additional Remarks: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. VERSION. ~: ~V 1.01 DATE: 89/05/02 . ~X. ~CORD ~NGTH. 1024 ~R~V~ODS ~I~ ~. ** FI~ HEADER ** FILE SEQUENCE FI~ N~E. ssds ~V LM VERSION ~: REV 1.01 DATE: 89/05/02 . PREVIOUS FI~ N~: ** DATA FO~T SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY DESCRIPTION 4 i 66 255 LOG DIRECTION, DOWN 0 1 66 TERMINATOR (NO MORE ENTRIES) 'DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNiT API API 'API API FILE SZE PROC S. piL REPR~ ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 i 4 0 I 68 GRA AAPI 0 0 0 0 i 4 0 I 68 GRB AAPI 0 0 0 0 i 4 0 I 68 CNF0 COUN 0 0 0 0 I 4 0 i 68 CNF1 COUN 0 0 0 0 i 4 0 i 68 CNN0 COUN 0 0 0 0 i 4 0 I 68 CNN1 COUN 0 0 0 0 i 4 0 I 68 ROP FT/H 0 0 0 0 i 4 0 i 68 GRC AAPI 0 0 0 0 i 4 0 i 68 EWR OHMM 0 0 0 0 i 4 0 I 68 CNPS P. U. 0 0 0 0 i 4 0 i 68 RHOB G/Q3 0 0 0 0 i 4 0 I 68 CAL G/C3 0 0 0 0 1 4 0 i 68 FET HOUR 0 0 0 0 I 4 0 i 68 GRA1 AAPI 0 0 0 0 I 4 0 i 68 GRB1 AAPI 0 0 0 0 i 4 0 i 68 NF01 COUN 0 0 0 0 i 4 0 i 68 NFl1 COUN 0 0 0 0 i 4 0 i 68 NN01 COLIN 0 0 0 0 1. 4 0 1 68 NN11 COUN 0 0 0 0 i 4 0 i 68 RAT1 FT/H 0 0 0 0 I 4 0 i 68 GRC1 AAPI 0 0 0 0 I 4 0 i 68 EWR1 OHMM 0 0 0 0 i 4 0 I 68 NPS1 P.U. 0 0 0 0 i 4 0 1 68 RHOB I G/C3 0 0 0 0 I 4 0 1 68 DPS1 P.U. 0 0 0 0 i 4 0 i 68 GRA2 AAPI 0 0 0 0 I 4 0 i 68 GRB2 AAPI 0 0 0 0 i 4 0 i 68 NF02 COUN 0 0 0 0 i 4 0 I 68 NFl2 COUN 0 0 0 0 i 4 0 i 68 NN02 ~ COUN 0 0 0 0 i 4 0 1 68 NN12 '~ COUN 0 0 0 0 I 4 0 I 68 RAT2 GRC2 EWR2 NPS2 RHOB 2 DPS2 GRA3 GRB3 NF03 NFl3 NN03 NN13 RAT3 GRC3 EWR3 NPS3 RHOB 3 DPS3 GRA4 GRB4 NF04 NFl4 NN04 NN14 RAT4 GRC4 EWR4 NPS4 RHOB 4 DPS4 FT/H 0 0 0 0 i 4 0 1 68 AAPI 0 0 0 0 1 4 0 1 68 OHMM 0 0 0 0 1 4 0 i 68 '~ P.U. 0 0 0 0 1 4 0 i 68 G/C3 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 I 4 0 I 68 COUN 0 0 0 0 1 4 0 I 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 1 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 FT/H 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 I 4 0 i 68 OHMM 0 0 0 0 i 4 0 1 68 P.U. 0 0 0 0 i 4 0 i 68 G/C3 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 I 4 0 I 68 AAPI 0 0 0 0 I 4 0 I 68 AAPI 0 0 0 0 i 4 0 I 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 I 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 FT/H 0 0 0 0 i 4 0 I 68 AAPI 0 0 0 0 i 4 0 i 68 OHMM 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 i 4 0 i 68 G/C3 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 I 4 0 I 68 ** 707 DATA RECORDS ** FROM 10102.00 TO 11515.50 FT ** FILE TRAILER** FILE NAME: ssds REV SERVICE NAME: ssds VERSION #: REV 1.01 DATE: 89/05/02 MAX. RECORD LENGTH: FILE TYPE: W2 NEXT FILE NAME: 1024 ** TAPE TRAILER** SERVICE NAME: ssds DATE: 89/05/02 ORIGIN OF DATA: TAPE NAME: WEST END CONTINUATION #: 01 NEXT TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** REEL TRAILER ** SERVICE NAME: ssds DATE: 89/05/02 ORIGIN OF DATA: RLL REEL NAME: BPX CONTINUATION #: 01 NEXT REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT **** LIS READ **** (NOTE: MAXIMUM RECORD LENGTH - 8192 BYTES) ** TAPE HEADER ** SERVICE NAME: ssds DATE: 89/05/02 ORIGIN OF DATA: W21 TAPE NAME: WEST END CONTINUATION #: 01 PREVIOUS TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ********** END OF FILE ********** **** LIS READ **** (NOTE: MAXIMUM RECORD LENGTH - 8192 BYTES) ** REEL HEADER ** SERVICE NAME: SPERRY DATE: 89/05/11 ORIGIN OF DATA: RLL REEL NAME: BPX CONTINUATION #: 01 PREVIOUS REEL NAME: COMMENTS: REEL~SEQUENCE # i PETROLEUM COMPUTING INC.- LIS FORMAT ** TAPE HEADER ** SERVICE NAME: SPERRY DATE: 89/05/11 ORIGIN OF DATA: W-21 TAPE NAME: PBU / WE CONTINUATION #: 01 PREVIOUS TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** COMMENTS ** ALL REPEAT DATA COLLECTED-~i~ ~G%I~G~UP OUT-OF'-HO~:'-- ..... ~': ********** END OF FILE ********** ** FILE HEADER ** FILE SEQUENCE # 1 FILE NAME: SPERRYREV SERVICE NAME: SPERRY VERSION #: REV 1.01 DATE: 89/05/11 MAX. RECORD LENGTH: 1024 FILE TYPE: W- PREVIOUS FILE NAME: ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 i 4 0 i 68 GRA AAPI 0 0 0 0 i 4 0 i 68 GRB AAPI 0 0 0 0 1 4 0 i 68 CNF0 COUN 0 0 0 0 i 4 0 1 68 CNF1 COUN 0 0 0 0 i 4 0 i 68 CNN0 COUN 0 0 0 0 i 4 0 I 68 CNN1 COUN 0 0 0 0 i 4 0 i 68 ROP FT/H 0 0 0 0 i 4 0 1 68 GRC AAPI 0 0 0 0 1 4 0 1 68 EWR . __ QH/~. ..... 0 0 0 0 1. ._4 D:- ~ 68 CNPS P.U. 0 0 0 0~ · 4 0 i' 68 CAL INCH 0 0 0 0 1 4 0 1 68 FET HOUR 0 0 0 0 i 4 0 i 68 GRA1 AAPI 0 0 0 0 1 4 0 i 68 GRB1 AAPI 0 0 0 0 I 4 0 i 68 NF01 COUN 0 0 0 0 I 4 0 i 68 NFll COUN 0 0 0 0 1 4 0 1 68 NN01 COUN 0 0 0 0 i 4 0 1 68 NNll COUN 0 0 0 0 I 4 0 i 68 RHOB G/C3 0 0 0 0 i 4 0 1 68 RAT1 FT/H 0 0 0 0 i 4 0 1 68 GRCl AAPI 0 0 0 0 1 4 0 i 68 EWR1 OHMM 0 0 0 0 i 4 0 i 68 NPS1 P.U. 0 0 0 0 I 4 0 i 68 RHOB 1 G/C3 0 0 0 0 i 4 0 i 68 DPS 1 P. U. 0 0 0 0 1 4 0 i 68 GRA2 AAPI 0 0 0 0 1 4 0 I 68 GRB2 AAPI 0 0 0 0 1 4 0 i 68 NF02 COUN 0 0 0 0 i 4 0 i 68 NFl2 COUN 0 0 0 0 1 4 0 i 68 NN02 COUN 0 0 0 0 1 4 0 1 68 NN12 COUN 0 0 0 0 i 4 0 1 68 RAT2 FT/H 0 0 0 0 i 4 0 i 68 GRC2 AAPI 0 0 0 0 1 4 0 i 68 EWR2 OHMM 0 0 0 0 1 4 0 1 68 NPS2 P.U. 0 0 0 0 1 4 0 1 68 RHOB 2 G/C3 0 0 0 0 i 4 0 i 68 DPS2 P.U. 0 0 0 0 i 4 0 I 68 GRA3 AAPI 0 0 0 0 i 4 0 i 68 GRB3 AAPI 0 0 0 0 1 4 0 1 68 NF03 COUN 0 0 0 0 1 4 0 1 68 NFl3 COUN 0 0 0 0 i 4 0 i 68 NN03 COUN 0 0 0 0 1 4 0 I 68 NN13 COUN 0 0 0 0 I 4 0 I 68 RAT3 GRC3 EWR3 NPS3 RHOB 3 DPS3 GRA4 GRB4 NF04 NFl4 NN04 NN14 RAT4 GRC4 EWR4 NPS4 RHOB 4 DPS4 FT~H 0 0 0 AAPI 0 0 0 OHMM 0 0 0 P.U. 0 0 0 G/C3 0 0 0 P.U. 0 0 0 AAPI 0 0 0 AAPI 0 0 0 COON 0 0 0 COUN 0 0 0 COUN 0 0 0 COUN 0 0 0 FT/H 0 0 0 AAPI 0 0 0 OHMM 0 0 0 P.Uo 0 0 0 o/c3 o o o P.U. 0 0 0 0 I 4 0 I 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 I 68 0 I 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 I 4 0 i 68 0 I 4 0 i 68 0 I 4 0 i 68 0 i 4 0 i 68 0 i 4 0 i 68 0 i 4 0 I 68 0 i 4 0 I 68 ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS' NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR DEPT ' ' FT -~' O ~'~' 0 ~ 0 ~'v 'i' 4-- ~: CODE 6'8 GRA AAPI 0 0 0 0 I 4 0 i 68 GRB AAPI 0 0 0 0 i 4 0 i 68 CNF0 COUN 0 0 0 0 i 4 0 i 68 CNF1 COUN 0 0 0 0 i 4 0 i 68 CNN0 COUN 0 0 0 0 i 4 0 i 68 CNN1 COUN 0 0 0 0 i 4 0 i 68 ROP FT/H 0 0 0 0 i 4 0 i 68 GRC AAPI 0 0 0 0 i 4 0 i 68 EWR OHMM 0 0 0 0 I 4 0 I 68 CNPS P.U. 0 0 0 0 i 4 0 I 68 CAL INCH 0 0 0 0 i 4 0 i 68 FET HOUR 0 0 0 0 1 4 0 i 68 GkA1 AAPI 0 0 0 0 i 4 0 i 68 GRB1 AAPI 0 0 0 0 i 4 0 i 68 NF01 COUN 0 0 0 0 i 4 0 i 68 NFll COUN 0 0 0 0 i 4 0 i 68 NN01 COUN 0 0 0 0 i 4 0 i 68 NN11 COUN 0 0 0 0 i 4 0 i 68 RHOB G/C3 0 0 0 0 i 4 0 i 68 RAT1 FT/H 0 0 0 0 i 4 0 i 68 GRC1 AAPI 0 0 0 0 i 4 0 i 68 EWR1 OHMM 0 0 0 0 i 4 0 i 68 NPS1 P.U. 0 0 0 0 I 4 0 i 68 RHOB i G/C3 0 0 0 0 I 4 0 i 68 DPSl P.U. 0 0 0 0 i 4 0 i 68 GRA2 AAPI 0 0 0 0 i 4 0 i 68 GRB2 AAPI 0 0 0 0 I 4 0 i 68 NF02 COUN 0 0 0 0 i 4 0 i 68 NFl2 COUN 0 0 0 0 1 4 0 I 68 NN02 COUN 0 0 0 0 I 4 0 I 68 NN12 COUN 0 0 0 0 i 4 0 I 68 RAT2 FT/H 0 0 0 0 I 4 0 i 68 GRC2 AAPI 0 0 0 0 I 4 0 i 68 EWR2 NPS2 RHOB 2 DPS2 GRA3 GRB3 NF03 NFl3 NN03 NN13 RAT3 GRC3 EWR3 NPS3 RHOB 3 DPS3 GRA4 GRB4 NF04 NFl4 NN04 NN14 RAT4 GRC4 EWR4 NPS4 RHOB 4 DPS4 O~ 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 I 4 0 1 68 G/C3 0 0 0 0 i 4 0 1 68 P.U. 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 I 4 0 i 68 AAPI 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 I 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 FT/H 0 0 0 0 I 4 0 i 68 AAPI 0 0 0 0 I 4 0 i 68 OHMM 0 0 0 0 I 4 0 i 68 P.U. 0 0 0 0 i 4 0 I 68 G/C3 0 0 0 0 i 4 0 i 68 P.U. 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 COUN 0 0 0 0 i 4 0 i 68 FT/H 0 0 0 0 i 4 0 i 68 AAPI 0 0 0 0 I 4 0 I 68 OHMM 0 0 0 0 i 4 0 I 68 P.U. 0 0 0 0 I 4 0 I 68 G/C3 0 0 0 0 I 4 0 i 68 P.U. 0 0 0 0 1 4 0 1 68 ** 708 DATA RECORDS ** ** FIR TRAI~R~:~-- - FROM 10100.00 TO 11515.50 FT FILE NAME: SPERRYREV SERVICE NAME: SPERRY VERSION #: REV 1.01 DATE: 89/05/11 MAX. RECORD LENGTH: FILE TYPE: W- NEXT FILE NAME: 1024 ** TAPE TRAILER** SERVICE NAME: SPERRY DATE: 89/05/11 ORIGIN OF DATA: W-21 TAPE NAME: PBU / WE CONTINUATION #: 01 NEXT TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** REEL TRAILER ** SERVICE NAME: SPERRY DATE: 89/05/11 ORIGIN OF DATA: RLL REEL NAME: BPX CONTINUATION #: 01 NEXT REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT