Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-040
ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com Date: May 27, 2025 FFROM:Anu Ambatipudi TO: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC 700 G Street 333 W.7th Ave., Suite 100 Anchorage AK 99501 Anchorage, Alaska DATA TRANSMITTAL Kuparuk River Unit/Field Well API #PTD #Comments 1H-112 50029237870100 2240320 3B-16A 50029212890100 2231250 2B-03B 50029211510200 2230800 2M-39 50103207950000 2181710 3S-612 50103207770000 2181110 3S-611 50103207740000 2181030 1H-108B 50029236080200 2180820 1H-110 50029236010000 2180310 1H-116 50029235940000 2180120 2S-06 50103207470000 2160850 2M-37 50103207450000 2160820 1D-39 50029229970000 2002160 1D-40A 50029229690100 2001900 2N-302 50103203800000 2011150 1R-03A 50029214060100 2000210 3H-37 50103208220000 2191940 2S-09A 50103207490100 2161280 T40450 T40451 T40452 T40453 T40454 T40455 T40456 T40457 T40458 T40459 T40460 T40461 T40462 T40463 T40464 T40465 T40466 By Gavin Gluyas at 1:15 pm, May 28, 2025 ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com Colville River Unit/Field Well API # PTD # Comments CD5-31 50103208280000 2210020 CD5-96 50103208110000 2191620 CD4-499 50103208100000 2191610 CD5-26 50103208060000 2191070 CD5-98 50103208030000 2190590 CD5-24 50103207990000 2190060 CD5-23 50103207610000 2171550 CD5-19 50103207600000 2171210 CD5-22 50103207590000 2170890 CD5-316 50103207560000 2170400 CD3-111A 50103205260100 2170040 CD3-198 50103206370000 2110240 CD4-24 50103206020000 2090970 CD4-26 50103206000000 2090490 CD2-15 50103203860000 2011590 CD2-12 50103204550000 2030730 CD4-214 50103205370000 2061450 CD4-17 50103205340000 2061180 CD2-73 50103205900000 2081960 T40467 T40468 T40469 T40470 T40471 T40472 T40473 T40474 T40475 T40476 T40477 T40478 T40479 T40480 T40481 T40482 T40483 T40484 T40487 CD5-316 50103207560000 2170400 ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com Greater Mooses Tooth Unit/Field Well API # PTD # Comments MT7-99 50103208450000 2221020 T40485 ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com ConocoPhillips Alaska 700 G Street Anchorage, AK 99501 Email: AKGGREDTSupport@ConocoPhillips.onmicrosoft.com MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, October 13, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL ConocoPhillips Alaska, Inc. CD5-316 COLVILLE RIV UNIT CD5-316 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 10/13/2023 CD5-316 50-103-20756-00-00 217-040-0 W SPT 7438 2170400 1860 2320 2320 2319 2320 14 21 22 21 4YRTST P Austin McLeod 8/19/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:COLVILLE RIV UNIT CD5-316 Inspection Date: Tubing OA Packer Depth 450 2910 2865 2850IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM230820164656 BBL Pumped:4.3 BBL Returned:4.3 Friday, October 13, 2023 Page 1 of 1 Wallace, Chris D (CED) From: Smith, Travis T <Travis.T.Smith@conocophillips.com> Sent: Thursday, January 21, 20214:17 PM To: Wallace, Chris D (CED) Cc: Senden, R. Tyler Subject: CRU CD5-316 (PTD# 217-040) MI Injection Attachments, CD5-316 90 -day TIO.pdf Chris— CRU injector CD5-316 (PTD# 217-040) was placed on MI injection on December 21, 2020. Per our earlier notification, the well was placed on a 30 -day monitoring period to evaluate if a swap of a dummy valve addressed TxIA communication issues. The 30 -day monitoring period ended yesterday. The pressure trends of the well did not exhibit anomalous behavior during the monitoring period. Therefore, we propose to return the well to normal WAG service. This will include sending a cancellation for Administrative Approval 18D.004. Our intent is to leave the well on MI injection while this paperwork is processed. A 90 -day TIO plot is attached. Please let me know if you have any questions or disagree with this plan. Travis Wallace, Chris D (CED) From: Well Integrity Compliance Specialist WNS & CPF3 <n2549@conocophillips.com> Sent: Sunday, September 6, 2020 4:46 PM To: Wallace,. Chris D (CED) Cc: CPA Wells Supt Subject: CRU CD5-316 (PTD 217-040) Monitor on Gas Injection Attachments: CD5-316.pdf; CD5-316 90 Day TIO 9-6-20.pdf Chris, CRU CD5-316 (PTD 217-040) has an AA (AIO 18D.004) to allow for water injection only due to TxIA communication on gas injection. On 8/23/20, the dummy valve in the well's single gas lift mandrel was swapped for one with a different type of packing. It is possible this dummy valve was the source of the TxIA communication on gas injection. It is ConocoPhillips's intention to place CRU CD5-316 on a 30 day monitor period on MI injection to see if the TxIA communication is still present. The well will remain on water injection until MI makes sense within the voidage management plan for the area. Please let me know if you have any questions or disagree with our plan. Attached are the schematic and 90 day TIO trend. Regards, Stephanie Pilch / alt: Sara Carlisle CPF3 & Alpine Well Integrity & Compliance Specialist ConocoPhillips Alaska Office: (907) 659-7126 MEMORANDUM State of Alaska Depth Alaska Oil and Gas Conservation Commission To: Jim Ri1� /`� DATE: Thursday, August 15, 2019 P.I. Supervisor " UU i�l SUBJECT: Mechanical Integrity Tests ' ConocoPhillips Alaska, Inc. I O CD5-316 FROM: Jeff Jones COLVILLE RIV UNIT C135-316 Petroleum Inspector 2613 2613 Sre: Inspector Reviewed By: 2170400 �Q P.I. Supry 1 1159 NON -CONFIDENTIAL Comm Well Name COLVILLE RIV UNIT CD5-316 API Well Number 50-103-20756-00.00 Inspector Name: Jeff Jones IDSpNum: miUJ190814105706 Permit Number: 217-040-0 Inspection Date: 8/22019 ' Rel Insp Num: Thursday, August 15, 2019 Page 1 of I Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well j CD5al6 ' Type Inj I O TVD 7438 - Tubing � 2612 - 2613 - 2613 2613 PTD 2170400 ' Type Test SPT Test psi 3000 IA 720 1310 3280 - 3380 BBL Pumped: 4.7 BBL Returned: 4.2 OA 125 150 150 150 Interval REQVAR P/F I P Notes: MIT -IA to Max. injection press. Per A10 18D.004. l well inspected, no exceptions noted. Thursday, August 15, 2019 Page 1 of I Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Saturday, February 9, 2019 9:58 AM To: Wallace, Chris D (DOA) Cc: Packer, J.Brett Subject: CRU CD5-316 (PTD 217-040, AIO 18D.004) Diagnostic MI/Gas Log Chris, CRU CDS-316 (PTD 217-040, AIO 18D.004) is an injector that recently obtained Administrative Approval for water -only injection due to known TxIA communication while on gas injection. CPA] has been investigating the mechanism of the gas -only leak path. The newest plan is to perform a diagnostic log that will require the liquid in the tubing to be displaced into the formation and leave the tubing gas packed with high surface pressure in attempt to activate the gas leak for logging. CPA[ intends to do this by injecting a limited amount of MI into the well, sufficient to clear the tubing. Please let us know if you have any questions or disagree with this plan. CPAI plans to move forward with this work soon. Regards, Rachel Kautz/Sara Carlisle Well Integrity Supervisor, ConocoPhillips Alaska Inc. Office: 907-659-7126 Cell: 816-868-2420 Originated: Schlumberger PTS- PRINT CENTER 6411 A Street Anchorage, AK 99518 (907) 273-1700 main (907)273-4760fax Delivered to: > 4, AOGCC . -jl ATTN: Natural Resources Technician II Alaska Oil & Gas Conservation Commision 333 W. 7th Ave, Suite 100 —,a Anchorage, AK 99501 21 1 140 30 22 5 s-Jan-ts 09Ja nt9-JW 02 SERVICE ORDER SERVICE Color WELL NAME API p p FIELD NAME DESCRIPTION DELIVERABLE DESCRIPTION DATATYPE DATE LOGGED Prints CD's Receiq. ATransmittal Receipt signature confirms that a package (box, �l --- OPM VA X V package have been verified to match the media noted above. Print Name Signature Date specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this Please return via courier or sign/scan and email a copy to umberger and CPAI. point. Tr sm'ttal Receiq. ATransmittal Receipt signature confirms that a package (box, �l envelope, etc.) has been received and the contents of the X V package have been verified to match the media noted above. Print Name Signature Date specific content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this Please return via courier or sign/scan and email a copy to umberger and CPAI. point. RECEWED2 1 7 x 4 0 11110 JUN 082018 29327 BA ER tISTRIBUTION LIST UGHES a GE company Please sign and return one copy of this transmittal form to: COMPANY ConocoPhillips Alaska,Inc. ConocoPhillips Alaska,Inc. Ricky Elgarico.ATO 3-380. WELL NAME CD5-316PB1 700'G'Street. Anchorage,Alaska 99501 FIELD Colville River Unit to acknowledge receipt of this data. COUNTY ALPINE LOG TYPE GR-RES-DEN-NEU BHI DISTRICT Alaska --- LOG DATE August 19,2018 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(a bhge.com TODAYS DATE June 6,2018 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD 1 FINAL CD/DVD FINAL PRELIM (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS CGM,Final Surveys) PERSON ATTENTION 4 OF PRINTS #Uh PILIN I S #OF COPIES #OF COPIES #OF COPIES 1 ConocoPhillips Alaska,Inc. 0 0 1 0 I 0 GSRMC,Ricky Elgarico.ATO 3-380. 700'G'Street. Anchorage,Alaska 99501 Ep ti JUN ` LUk . 2 Alpine Wells Supervisor,ALP-33 0 I 0 1 I 0 I 0 P.O.Box 196860 Anchorage,Alaska.99519-6860 3 ASRC,Attn:Teresa lmm 0 I 0 1 0 0 3900'C'Street,Suite 801 Anchorage,Alaska 99503-5963 4 Wayne Svejnoha 0 I 0 I 1 1 0 I 0 BLM State Office 222 W.7th Ave.,Suite#13 Anchorage,Alaska 99513-7504 5 AOGCC ATTN:Natural Resources Tech 0 I 0 I Offito I 0 I 0 333 W.7th Ave.,Suite 100 Anchorage,Alaska 99501-3539 6 DNR,Division of Oil&Gas 0 I 0 I 1 0 I 0 Attn:James Hyun 550 W.7th Ave.,Suite 800 Anchorage,Alaska 99501-3510 Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Saturday,April 7, 2018 2:33 PM To: Wallace, Chris D (DOA) Cc: Senden, R.Tyler Subject: CRU CD5-316 (PTD 217-040) End of Monitor and Return to Normal Status Attachments: CD5-316 TIO Plot 90-day 4-7-2018.docx Chris, CRU injector CD5-316(PTD 217-040) is at the end of a 30-day monitor while on MI injection. The monitor was initiated due to suspect IA pressurization after a bleed. However,the pressure trends over the course of the monitor period suggest the well has integrity. CPAI intends to return the well to normal WAG injection status at this time. Please let us know if you have any questions or disagree with this plan. Attached is a 90-day TIO plot. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 MEMORANDUM i State of Alaska Depth Alaska Oil and Gas Conservation Commission DC7 DATE: Tuesday, October 31, 2017 TO. Jim Regg PTD 2170400 P.J. Supervisor \ �5 �I i'r SUBJECT: Mechanical Integrity Tests IA CONOCOPHILLIPS ALASKA, INC. .Test s.z BBL Returned: CD5-316 FROM: Guy Cook COLVILLE RIV UNIT CD5-316 Petroleum Inspector LP Src: Inspector ✓ Reviewed By: P.I. Supry S NON -CONFIDENTIAL Comm rRelpInsp Name COLVILLE RIV UNIT C135-316 API Well Number 50-103-20756-00-00 Inspector Name: Guy Cook Permit Number:217-040-0 Inspection Date: 10/25/2017Num: miIGDC171029084624 Num: Pretest Initial 15 Min 30 Min 45 Min 60 Min 1160 1160 - 1140 1110 1_50 2200 2150 ?Ii0 100 no 1io 1i0 Tuesday, October 31, 2017 Page I of 1 Packer Depth Well C135316 Type Inj W- TVD 733$ Tubing PTD 2170400 Type Test SPT psi 1860 IA BBL Pumped: .Test s.z BBL Returned: 3A OA Interval INITAL P/F LP Notes: Little Red Services pump truck was used to test. ✓ Pretest Initial 15 Min 30 Min 45 Min 60 Min 1160 1160 - 1140 1110 1_50 2200 2150 ?Ii0 100 no 1io 1i0 Tuesday, October 31, 2017 Page I of 1 Loepp, Victoria T (DOA) From: Wallace, Chris D (DOA) Sent: Friday, January 12, 2018 2:23 PM To: Loepp, Victoria T (DOA) Subject: FW: CRU CD5-316 (PTD 217-040) Conductor Water Flow Follow Up Flag: Follow up Flag Status: Flagged fyi From: NSK Well Integrity Supv CPF3 and WNS [mailto:n2549@conocophillips.com] Sent: Friday, January 12, 2018 1:59 PM To: Wallace, Chris D (DOA) <chris.wallace@alaska.gov> Cc: Senden, R. Tyler <R.Tyler.Senden@conocophillips.com> Subject: CRU CD5-316 (PTD 217-040) Conductor Water Flow Chris, Operations reported that CRU well CD5-316 (PTD 217-040) is at present flowing approximately 6 to 7 gallons of water per day to surface through the surface casing by conductor annulus. CPAI suspects this water to be from the same shallow source water that was encountered on CD5-313 (PTD 215-084). We will take initial samples for analysis and collect water at the wellhead to monitor the flow volume. Please let me know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor, ConocoPhillips Alaska Inc. Office: 907-659-7126 Cell: 907-943-0450 Guhl, Meredith D (DOA) From: Guhl, Meredith D (DOA) Sent: Friday, January 5, 2018 1:58 PM To: 'Dai, Weifeng' Cc: Bettis, Patricia K (DOA) Subject: CRU CD5-316, PTD 217-040, Pilot Hole Hello Weifeng, I am completing the compliance review for CRU CD5-316. During the review it was noted by senior staff that the approved permit requirements were not followed for this well. As noted in the second paragraph on the approval letter, "all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name CRU CD5- 316PH...... This requirement was not followed, and all data and logs received are labeled CRU CD5-316PB1. Also a 10-407 was submitted for the pilot hole but labeled CRU CD5-316PB1 also. For future pilot holes, please follow all requirements of the permit letter. If these requirements are not adhered to, the data, logs and records will be returned for reprinting with the correct required well name. If you have any questions, please contact me. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 mered ith.ftuhl @alaska.aov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.¢uhlOalaska.¢ov. DATA SUBMITTAL COMPLIANCE REPORT vsr201 8 Permit to Drill - Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20756-00-00 2170400 Well Name/No. COLVILLE RIV UNIT CDS-316 N- MD 27798 TVD 7471 Completion Date 9/28/2017 Completion Status WAGIN Current Status WAGIN UIC No REQUIRED INFORMATION Mud Log No ✓ / Samples No J / Directional Survey Yes V DATA INFORMATION List of Logs Obtained: GR/Res/NMR/SonicScope �K = Cr R4 2GS/-rf-AVH (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received ED C 28758 Digital Data 39 2370 10/30/2017 _Comments _ Electronic Data Set, Filename: CPAI CD5- 316_Scope Resistivity_RM_LAS_LWD001.1as . ED C 28758 Digital Data 2298 13849 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316_Scope Resistivity—RM _ LAS _LW0002.1as . ED C 28758 Digital Data 13798 24806 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316—Scope Resistivity_RM_LAS_LWD003.las - ED C 28758 Digital Data 19302 23396 10/30/201.7 Electronic Data Set, Filename: CPAI CD5- 316_Scope Resistivity_RM_LAS _LWD005.las ED C 28758 Digital Data 23356 27798 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316—Scope Resistivity_RM_LAS_LWD006.las ' ED C 28758 Digital Data 39 27797 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316_Scope Resistivity_RM_LAS.Ias ' ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI CD5-316_Scope - Resistivity_RM_LW D002.diis ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LW D002.htm I ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LW D003.d1is ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope . Resistivity_RM_LW D003.htm I ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LW D005.dlis ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_C05-316_scope Resistivity_RM_LW DOO5.html ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LW C006.dlis AOGCC Pagel of 5 Friday, January 5, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/5/2018 Permit to Drill 2170400 Well Name/No. COLVILLE RIV UNIT CDS-316 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103.20756.00-00 MD 27798 TVD 7471 Completion Date 9/28/2017 Completion Status WAGIN Current Status WAGIN UIC No ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LW DOO6.htm I ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope Resistivity_RM_LWE 001_DLIS.dlis ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope - Resistivity_RM_LWD001_DLIS.html ' ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316_Scope , Resistivity_RM_DLIS Alis ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI CD5-316_Scope Resistivity_RM_DLI S. html ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5- 19 316_Scope_Resistivity_2MD_RM.PDF , ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5- i F 316_Scope_Resistivity_2TVD_RM.POF , ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5- P 316_ Scape_Resistivity_SMD_RM.PDF ED C 28758 Digital Data 10/30/2017 Electronic File: CPAI_CD5- - P 316_Scope_Resistivity_5TVD_RM.PDF , ED C 28758 Digital Data 10/30/2017 Electronic File: C05-316 NA027 EOW Compass Survey [Canvas].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NA027 EOW Compass - Survey [Macro].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD27 EOW Compass Survey [Petrel].txt - ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD27 EOW Compass - Survey [Surveys].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD27 EOW Compass- Survey.pdf ED C 28758 Digital Data 10/30/2017 Electronic File: CDS-316 NAD83 EOW Compass ' Survey [Canvas].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD83 EOW Compass, Survey [Macro].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NA083 EOW Compass - Survey [Petrel].txt ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD83 EOW Compass . Survey [Surveys].txt AOGCC Page 2 of 5 Friday, January 5, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/5/2018 Permit to Drill 2170400 Well Name/No. COLVILLE RIV UNIT CD5-316 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.103-20756.00-00 MD 27798 TVD 7471 Completion Date 9/28/2017 Completion Status WAGIN Current Status WAGIN UIC No ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316 NAD83 EOW Compass Survey.pdf ED C 28758 Digital Data 10/30/2017 Electronic File: CD5-316_Final Surveys.csv Log C 28758 Log Header Scans 0 0 2170400 COLVILLE RIV UNIT CD5-316 LOG HEADERS Log C 28759 Log Header Scans 0 0 2170400 COLVILLE RIV UNIT CD5-3161361 LOG HEADERS ED C 28759 Digital Data 39 2370 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316PB1 VISION Semice_RM LAS_LWD001.1as ED C 28759 Digital Data 2230 13848 10/30/2017 Electronic Data Set, Filename: CPAI_CD5- 316PB1 VISION Service_RMLAS_LWD002.1as ED C 28759 Digital Data 39 13848 10/30/2017 Electronic Data Set, Filename CPAI_CD5- 316PB1 VISION Service_RM_LAS.Ias ' ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI CD5- 316PB1_VISION — Service_RM LWD002 DLIS.dii — — s ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_rviCD5- n 316PB1_VISION_Sece_RM_LWD002 — DLIS.ht b1 ml ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5- 316PB1 VISION Service RM LWD001 DLIS.dii . _ _ _ _ _ a ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5- 316PB1 VISION Service RM LWD001 DLIS.ht mt ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5- 316PB1 VISION_Service_RM_OLIS.dlis ` ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5- 316PB1 VISION_Service_RM_DLIS.html` ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316PB1_VISION jp Service 2MD RM.pdf ED C 28759 Digital Data Electronic File: CPAI_CD5-316PB1_VISION n10/30/2017 r Service_2TVD_RM.pdf ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316PB1_VISION' Q Service _5MD_RM.pdf ED C 28759 Digital Data 10/30/2017 Electronic File: CPAI_CD5-316PB1 VISION T Service_5TVD_RM.pdf - AOGCC Page 3 of 5 Friday, January 5, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/512018 Permit to Drill 2170400 Well Name/No. COLVILLE RIV UNIT CD5-316 MD 27798 ED C ED C ED C ED C ED C ED C ED C ED C TVD 7471 28759 Digital Data 28759 Digital Data 28759 Digital Data 28759 Digital Data 28759 Digital Data 28759 Digital Data 28759 Digital Data 28759 Digital Data ED C 28759 Digital Data ED C 28759 Digital Data ED C 28759 Digital Data Well Cores/Samples Information: Name INFORMATION RECEIVED � Completion Report G Production Test Informatior(9NA Geologic Markers/Tops n COMPLIANCE HISTORY Completion Date 9/28/2017 Interval Start Stop Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20756.00.00 Completion Status WAGIN Current Status WAGIN UIC No 10/30/2017 Electronic File: CD5-316PB1 NAD27 EOW - Compass Survey [Canvas].txt 10/30/2017 Electronic File: CD5-316PB1 NAD27 EOW Compass Survey [Macro].txt 10/30/2017 Electronic File: CD5-316P81 NAD27 EOW - Compass Survey [Petml].txt 10/30/2017 Electronic File: CD5-316PB1 NAD27 EOW , Compass Survey [Survey].txt 10/30/2017 Electronic File: CD5-316PB1 NAD27 EOW ' Compass Survey.pdf 10/30/2017 Electronic File: CD5-316PB1 NAD83 EOW - Compass Survey [Canvas].txt 10/30/2017 Electronic File: CD5-316PB1 NA083 EOW - Compass Survey [Macro].txt 10/30/2017 Electronic File: CD5-316PB1 NAD83 EOW' Compass Survey [Petrel].txt 10/30/2017 Electronic File: CD5-316PB1 NAD83 EOW Compass Survey [Survey].txt 10/30/2017 Electronic File: CD5-316PB1 NAD83 EOW Compass Survey.pdf 10/30/2017 Electronic File: CD5-316PB1_Final Surveys.csv Sample Set Sent Received Number Comments Directional / Inclination Data 4 Mud Logs, Image Files, Digital Data Y / Core Chips Y /6 Mechanical Integrity Test Information Y /® Composite Logs, Image, Data Files © Core Photographs Y /'o Daily Operations Summary rY Cuttings Samples Y /® Laboratory Analyses Y NA AOGCC Page 4 of 5 Friday, January 5. 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/512018 Permit to Drill 2170400 Well Name/No. COLVILLE RIV UNIT CD5-316 Operator CONOCOPHILLIPS ALASKA, INC. MD 27798 TVD 7471 Completion Date 9/28/2017 Completion Status WAGIN Current Status WAGIN Completion Date: 9/28/2017 Release Date: 4/19/2017 Description Date Comments Comments: Compliance Revle\ Date: API No. 50.103.20756-00-00 UIC No AOGC( Page 5 of 5 Friday, January 5, 2018 STATE OF ALASKA I ALASKA OIL AND GAS CONSERVATION COMMISSION rgCVCIVLU OCT 3 0 2017 WELL COMPLETION OR RECOMPLETION REPORT AACDMC 1a. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ tb. Well Class: 20AAC 25.105 20AAC 25.10 Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAGQ • WDSPL ❑ No. of Completions: Service D, Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Abend.: 9/28/2017 217-040 , 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 7/25/2017 50-103-20756-00-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 380' FNL, 2728' FEL, Sec 18, T11 N, R4E, UM 9/21/2017 CRU CD5-316 Top of Productive Interval: 9. Ref Elevations: KB: 70.44 - 17. Field / Pool(s): 2405' FNL, 3055' FEL, Sec 26, T11 N, R3E, UM GL: 34 • BF: Colville River Unit/Alpine Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: , 196' FNL, 1979' FEL, Sec. 2, T1 ON, R3E, UM N/A ASRC-NPR4, AA092347, AA092344, AA081817, AA094165, AA094167 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 349250 y- 5965835 Zone- 4 27798'/ 7471' , 932659, 340758, 340757, 932552, 366608,366608 TPI: x- 338459 y- 5953471 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/rVD: Total Depth: x- 339366 y- 5945099 Zone- 4 2203 / 2060' 1340'/ 1320' 5. Directional or Inclination Survey: Yes M (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res/ NMR/ Sconicscope 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 78.6 B 36' 116' 36' 116' 42" 10 yds 13-3/8" 68 L-80 36' 2360' 36' 2176' 16" 347 bbls 11.0 ppg DeepCrete, 72 bbls 15.8 ppg G 9-5/8" 40 L-80 1987' 13839' 1889' 6068' 12.25" 424 bbls 13 ppg G; 52 bbls 15.8 ppg G 7" 26 L-80 34' 13689' 34' 6021' 8.75" 7" 1 26 L-80 1 13682' 1 19333' 1 6020' 1 7446' 9.625" 160 bbis 15.8 ppg G 4-1/2" 1 12.6 L-80 1 19170' 27778' 7437' 1 7470' 6.125" 1 uncemented perf pup liner 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MDlrVD of Top and Bottom; Perforation SIZE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number; Date Perfd): 4-1/2" 19181 19186' MD / 7439' TVD 19170' -27778' MD / 7437'- 7470' TVD Perf Pup Liner COMPLETION DATE 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes No i1- Per 20 AAC 25.283 (i)(2) attach electronic and printed information VERIFIED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 10/112017 Flowing Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 10/13/2017 4 hours Test Period 770 493 1 1 1640 scf/bbl Flow Tubing Casing Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr): Press. 474 psi 880 psi 24 -Hour Rate -.1o. 4619 2956 7 40°F Form 10-407 evised 5/2017 1/�lL /x/29 /'L CONT)Nl{Er D ON PAGE 2 Submit ORIGINAL onl 4'K3 ���ii� � N RBEIMS t U NOV - 2 2017 28. CORE DATA Conventional Coiets): Yes ❑ No ❑✓ Sidewall Cores: as ❑ No ❑D If Yes, list formations and intervals cored (MD/ND, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this forth, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. N/A 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1340' 1320' Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval information, including reports, per 20 AAC 25.071. Formation @ TPI -Kuparuk C 19269 7444 C-40 2224 2074 C-30 2531 2300 C-20 3050 2616 C-10 3543 2828 K3 6450 3736 K2 (Qannik) 7220 3980 Albian 97 8261 4303 Albian 96 10984 5168 Albian 95 14015 6123 Albian 94 15062 6480 Albian 93 15893 6716 HRZ 17690 7226 Kalubik 18034 7306 K-1 18315 7358 Kuparuk C 19269 7440 Formation at total depth: Kuparuk C 1 27798 1 7471 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic, Cement Report Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Chip Alvord Contact Name: Weifeng Dai Authorized Title: Drilling Manager Contact Email: Weifeng.Dai@cop.com Authorized Contact Phone: 263-4324 a,� Signature: ,c Date: l;,( 3AzL l INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10407 well completion report and 10.404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil 8 Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10407 Revised 5/2017 Submit ORIGINAL Only STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVE® OCT 3 0 2017 WELL COMPLETION OR RECOMPLETION REPORT 1 a. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned Q Suspended ❑ 1b. Well C s . 20AAC 25.105 20AAt 25110 Development ❑ Explor. tory ❑ GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: Service ❑✓ Stratigrap is Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number //Sundry: ConocoPhillips Alaska, Inc. Abend.: 9/28/2017 217-040 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 7/25/2017 50-103-20756} -00 4a. Location of Well (Governmental Section): 8. Date TO Reached: 16. Well Name an Number: Surface: 380' FNL, 2728' FEL, Sec 18, T11 N, R4E, UM 8/19/2017 CRU CD -3 pjA Top of Productive Interval: 17. Field/ Po (s): 9. Ref Elevations: KB: 70.44 2486' FNL, 3040 FEL, Sec 26, T11 N, R3E, UM GL: 34 BF: Colvill iver Unit/Alpine Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. PropgAy Designation: 3032' FNL, 2685' FEL, Sec 26, T11 N, R3E, UM 14080/6144 A C-NPR4, AA092347, AA092344, 081817, AA094165, AA094167 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19 NR Approval Number: Surface: x- 349250 y- 5965835 Zone- 4 19537 / 7457 932659, 340758, 340757, 932552, 366608,366608 TPI: x- 338473 y- 5953390 Zone- 4 12. SSSV Depth MDrrVD: 20. Thickness of Permafrost MD/TVD: Total Depth: z- 338817 y- 5952836 Zone- 4 N/A 1340'/ 1320' 21. Re-drilVLateral Top Window MDIfVD: 5. Directional or Inclination Survey: Yes ✓ (attached) No LJ 13. Water Depth, if Offsh e: Submit electronic and printed information per 20 AAC 25.050 N/A (ft L) 14080/6144 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all ectronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed includ , but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperat e, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary ,� GR/Res/NMR I ^� J 23. CASING, LINER AND CEM NG RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING76068' HOLE SIZE CEMENTING RECORD AMOUNT TOP BOTTOM TOP FT PULLED 20" 78.6 B 36' 116' 36' 42" 10 yds 13-3/8" 68 L-80 36' 2360' 36' 16„ 347 bbls 11.0 ppg DeepCrete, 72 bbis 15.8 ppg G 9-5/8" 40 L-80 1987' 13839' 424 bbls 13 ppg G; 52 bbls 12.26" 15.8 ppg G 24. Open to production or injection? Yes ❑ No ❑✓ 25. TUBING RECORD If Yes, list each interval open (MD/rVD of Top and Bottom; Perlration SIZE DEPTH SET (MD) PACKER SET (MDrrVD) Size and Number; Date Perfd): N/A NO2*3, 0 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes LJ No ✓ N/A DATE Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED VERIFIED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): N/A PLUGGED BACK Date of Test: Hours TesteX. Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Test Period Flow Tubing Cas i , Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity -API (torr): Press. 24 -Hour Rate Form 10-407 Revised 5/2017 +W J 1 Idle? CONTINUED ON PAGE 2 RB[2MS NOV - 2 2017 SubmitORIGINIAL only 28. CORE DATA Conventional Cow,$): Yes ❑ No Sidewall Cores: , as ❑ No ❑� If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. N/A 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1340' 1320' Attach separate pages to this form, if needed, and sybmit detailed test Top of Productive Interval information, including reports, per 20 AAC 25.071 Formation @ TPI - Kuparuk C 19415 7448 C-40 2224 2074 C-30 2531 2300 C-20 3050 2616 C-10 3543 2828 K3 6450 3736 K2 (Qannik) 7220 3980 Albian 97 8261 4303 Albian 96 10984 5168 Albian 95 14013 6123 Albian 94 15506 6507 Albian 93 16524 6757 HRZ 18621 7268 Kalubik 18907 7335 K-1 19045 7365 Kuparuk C 19415 7435 LCU 19466 7444 Formation at total depth: LCU 1 19537 1 7457 1i 31. List of Attachments: Operations Summary, Definitive Survey, Cement Report Information to be attached includes, but is not limited to: summary of daily operations, wellb a schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Chip Alvord Contact Name: Weifeng Dai Authorized Title: Drilling Manager Contact Email: Weifeng.Dai@cop.com Authorized Contact Phone: 263-4324 Signature: Date: (.J W (k ' ` INSTR TIONS General: This form and the required attachments provide a complete an concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sun report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be sub itted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from m re than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injerton, Water-Altemating-Gas Injection, Sait Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flan a elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any a chments. Item 15: The API number reported to AOGCC must be/14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil 8 Gas / Division oWining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true verticaVhickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 2,111125.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonVent, whichever occurs first. Item 23: Attached supplemental records shod show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separ9fe production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the i3derval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to s ch interval). Item 27: Method of Operation: Flowin Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals red and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, corehips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only WNS INJ CDS-316 CNJOCOPhilllpS Well Attributes Max Angle &MD TD Alasl JW wmnme Apuuw'I =17K 50103N7580D NANUG KUPARUK INNleemsmw nNM MOInNBI an am MNpl INJ 83.29 20,14&66 2],798.0 Wmmem M]Blppal DNe MmWMn Ill NIA44gi1 RIp RNes ONe mso+epem D4v4B5De pet Seel NIPPLE Lass WO: M." M-17 e,uc m a MnmMmn DagM1(hl(BI En4D6 Annabtlon Ii NI es! CartRev Reason: NEWWELL, GLVC70. SETINJ pproven IOI242017 RAxCER. eIn VALVE _.._ ......... ......_.. BSIng Ingo ..- ...... ........ .................. Camp DeecrlgNn W(In ID(Inl TAP (nKB) SN Depin (M(B) nN bqF (iW}.. %VIAn D...GMe Top TXIN] CONDUCTOR 20 19.124 36.5 115.5 115.5 78.608 Welded <slnp Dexnglon OD(Inl IO pnl TOP(FNB) BNDolvic NB) Bel Oegn lTVDF.�vMLen II... Grate Top Tnreao SURFACE 13318 12.415 35.5 2,359.8 2,176.3 W.00480 HWJ Cwlnp DexrIpu.n Wlinl ID(Inl rp(ftM) BNDeNnpINB) BN Nein ITVD}., KYIwn II... GMe Top 11. INTERMEDIATEMI 9518 &940 1,987.1 13,&3&8 6,08&4 40.00 L-80 BTCM GSIn00esrlptlpn W(Inl Il T" BN Deet BIIKS) W BunnW}.. ITVMIsn 11 GMe Top Th. INTERMEDIATE 02 Tb 7 8276 33.8 13.689.3 eame 26.00 L90 BTCM seek. CONDV<iOR. b.}1155 .ing Dinopen OD(Ini 1011.) Top Men EN ""pin eft") aN Deph ITW1... YMNn 11... Om]e Tap Tnnml NMRMEDIATE 42 7 6.276 13,681.6 191333.0 7,445.7 MOB L 80 Ness CW1p Desxgbn OD(Inl ID Bin) TW"In 30 Dust(") BN DeHn IrV01.- vMLen 11... OMD Tap nna4 LINER 4 12 3.958 19.189 B 17.MA 2470.3 12.60 480 TXP-M Uner Details xominal lD IxdEcnox vLY z.xwo rop lnxel Top P'Dl lnxn Tup Xrcl (% n.m D.x com (In) 19.169.8 7.4384 87. Seving Sleeve 5.80' Seltlng sleeve wf V ID 5.000 19.185.9 7,439.2 87.10 PACKER 4-112'x7°269 HR D -E ZXP Liner Top PeCkq 3.873' 3875 Real Bore sunrACE: DsbaD.a p 19.196.4 ].439.8 87 i HANGER 4-12'x7°Flex-Lock Unel Hanger 3950 19,203.3 7.40.3 87.12 XO Reducing PDwuver Been, 4-1@"L-80 Hyd 521 boxx 0.l?' 4.000 (Belln9) 12.60 TXD pin GAsurT;a,Bs4r Tubing Strings Tu611q Dncnpnon slnnv Me...lD11p rap lnxe) sN sN pegn -B-)IZ 4.SITYD563 412 3.958 31.4 9,181... 19,101.3 7.*30., 7,430.0 12.60400 L80 LISSCo.. H563 Cwnple�l�lo�nly��, Completion Details Il...IPTuQ 1, Mq., XamIm11D )]b1J.a9B] )TlnCon,XNbe Tpp (hKTTW(3ep ( C pnl 3Op 31.4 31144 VOID 000 HANGER FMC 4-1f2 TUDing HangerTC II TODxHN81fi63 B410Dm 3800 cenxm FLp:Ispe20nxB 2.203.6 2,059.8 4036 NIPPLE WILE LANOING,4 VY,X,3b13",Ill 3813 IxTERMEowrEnnpav' d 14,622.2 6,347.0 70.57 SLIDING SLV SLEEVESLIDING,4 t7,CMD, BAKER,3.813° X- HVOfi63 3813 SLIDING30¢14.9221 14,6]].8 6,365.2 71.21 NIPPLE NIPPLE.LANDING,4 W3m8XN, (HYD563w0M1RHC Plug Body Installed -Pulled 9Y 017) IMS 19,1E64 7.438Z 87M LOCATOR LOCATOR SUB WI 2W SPAGEOUT 3,930 191166.9 7,438.3 8209 SEALASSY SEAL ASSEMBLY 3.930 R.IB1E6w sFu Au-Asea53f.ls fees Other ti Hole (Mrel retrievable pmgsr valves, pumps, Ill eta) rap(Tv01 TopmN Tap IXNBiIXNBI (°1 Deo C. Run Mm ID lin) 2,203.0 2.059.3 40351NJEC4IAv IM.VALVE(MCX)in XNIPPLEON3.8P XAOCK IW1WeUI1 1.750 I AV (35 I Mandrel Inserts In pX on X To hl(B p( ) TpIKBI l Mate Mabel W pn) ge1+, vahe L'= PoXNm 70.0 Run type TyPD I ) IWI Run Dab Co. miFRMEDNTE p2'.1>Bn6 1606160 1 3.394.] 2,7]3.] SLB 9 . 1 1 GA.U111 DMY BTM 0.000 QO ldol 01] Notes: General & Safety DNe AnnerNlen 9/88%Entl 1] NOTE: Un.: 18,Iel Ilb.p operations Summary (with Timelog uepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WS) End Depth (RKB) 7/24/2017 7/24/2017 2.00 MIRU MOVE MOB P Move pits and motors away from sub. 0.0 0.0 10:00 12:00 PJSM, skid rig floor into move position. 7/24/2017 7124/2017 1.00 MIRU MOVE RURD P PJSM, Continue skidding dg floor. 0.0 0.0 12:00 13:00 Secure choke line, prepare cellar to move. 7/2412017 7/24/2017 3.00 MIRU MOVE MOB P Stage pits, motors and Ball Mill further 0.0 0.0 13:00 16:00 down pad. Relocate mats for staging sub on upwind side as wind break for crane operations. SIMOPS- Replace pipe shed bridge crane. 7124/2017 7/24/2017 1.00 MIRU MOVE MOB P Move Sub off 314X and stage. 0.0 0.0 16:00 17:00 7/24/2017 7/2412017 0.50 MIRU MOVE RURD P Move and set surface annular on well, 0.0 0.0 17:00 17:30 test adapter flange seals to 500 psi. 7/24/2017 7124/2017 2.00 MIRU MOVE RURD P PJSM, Move and stage MPD 0.0 0.0 17:30 19:30 equipment in cellar area with crane. R/D dunnage, berming around 314X. SIMOPS- Install ODS cellar wind wall. Set production piping in place, move crane back to make way for sub. 7124/2017 7/24/2017 2.00 MIRU MOVE MOB P Move and spot sub over well, set 0.0 0.0 19:30 21:30 stompers. Skid rig floor to drill position over CDS-316. 7124/2017 7/24/2017 1.00 MIRU MOVE MOB P Spot pits, motors and ball mill. 0.0 0.0 21:30 22:30 7/24/2017 7/25/2017 1.50 MIRU MOVE RURD P Working on rig acceptance checklist. 0.0 0.0 22:30 00:00 SIMOPS- Spot pipeshed. 7/25/2017 7/25/2017 1.00 MIRU MOVE RURD P Continue working on rig accept and 0.0 0.0 00:00 01:00 pre -spud checklist, take on 9.6 ppg Drilplex. Prime both pumps. Trim Herculite around rig. Shim pipe shed. Rig accept @ 01:00 hrs. 7/2512017 7/25/2017 3.50 MIRU MOVE RURD P Rig up split surface riser, flow line, 0.0 0.0 01:00 04:30 drain lines, hole fill and bleeder lines. Load pipe shed with 5" HWDP. (SIMOPS- Gyrodata load GWD tool in sub, SLD DD/MWD work on tools in pipe shed. Obtain RKB's and install 90' mousehole. RKB to GL= 36.44 RKB to LR= 35.50 7/25/2017 7/2512017 2.75 MIRU MOVE BHAH P PJSM, M/U 16" bit and BHA #1 to 98' 0.0 98.0 04:30 07:15 per SLB, Gyrodata. Scribe motor, GWD and MWD. Measure, calculate and establish TF offset from Gyro= 256°, TF offset from MWD= 276`. Screenshots on file. MIU DC stand. 7/25/2017 7/25/2017 0.50 MIRU MOVE SFTY P Pre -Spud meeting with DDI crew, SLB 98.0 98.0 07:15 07:45 DD/ MWD, CPAI, Gyrodata, Sperry Hoisting (Backup). Discuss hazards, evacuation plans, expected well pressures, mud weights, SIMOPS on pad, Anti -collision, mud and cuttings handling, review posted permits and hazards. Page 1145 ReportPrinted: 10/16120171 . perations Summary (with Timelog . apths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log stun Depth Stan Tune End Time Dur (hr) Phase Op code Aduviry code Time P -T -X Operaton (RKB) End Depth (f1K13) 7/25/2017 7/25/2017 0.50 MIRU MOVE SEQP P Install blanking flange on new kill line. 98.0 98.0 07:45 08:15 Fill hole with 9.6 ppg Drilplex and check for leaks -good. Hook up Koomey and Function 20" annular - good. 7/25/2017 7/25/2017 0.25 MIRU MOVE SEQP P Pressure test mud lines to 3500 psi - 98.0 115.0 08:15 08:30 good. Wash down from 98' MD to 115' MD @ 450 gpm 390 psi, 40 rpm, .5k Tq. Tag formation @ 115'. 7/25/2017 7/25/2017 3.50 SURFAC DRILL DDRL P Directional drill from 115' MD to 350' 115.0 350.0 08:30 12:00 MD, 350' TVD. 450 gpm, 550 psi, 40 rpm rotating, 2.5k Tq, 10-20k WOB. ADT=2.72 hrs, AST= .77 hrs, ART= 1.95 hr. PIU=90k, S/0=83k, ROT=85k. Obtain Gyro survey at 115' and each stand after. Rig on highline @ 09:40 hrs 7/25/2017 7/26/2017 12.00 SURFAC DRILL DDRL P Directional Drill from 350' MD to 1,136' 350.0 1,136.0 12:00 00:00 MD, 1,126' TVD. 450 gpm, 900 psi, 40 -60 rpm rotating, 8k/2k TO ontoff, 15- 30 WOB. ADT= 5.03 hrs, AST= 2.58 hrs, ART= 2.45 hrs, Bit Hrs=10.82. PIU=110k, S/0=110k, ROT= 115k. Observe well static on connections. Continue taking Gyro surveys each stand to 1,076' MD, until three good matching MWD surveys. 7/2612017 7/26/2017 12.00 SURFAC DRILL DDRL P Directional Drill from 1,136' MD to 1,136.0 2,253.0 00:00 12:00 2,253' MD, 2,098' TVD. 775 gpm, 2100 psi, 60 rpm rotating, 7k/3k TQ on/off, 15-30 WOB. ADT= 9.17 hrs, AST= 2.73 hrs, ART= 6.44 hrs, Bit Hrs=19.99. P/U=132k, S/0=11 18k, ROT= 125k. Observe well static on connections, mud weight 9.8-10.0 ppg 7/26/2017 7/26/2017 3.50 SURFAC DRILL DDRL P Directional Drill from 2,253' MD to 2,253.0 2,370.0 12:00 15:30 2,370' MD, 2,183' TVD. 800 gpm, 2200 psi, 60 rpm rotating, 51k/2k TQ ontoff, 15-30 WOB. ADT= 2.88 hrs, AST= 1.04 his, ART= 1.84 hrs, Bit Hrs=22.87. P/U=140k, S/0=110k, ROT= 115k. Observe hard spot and bit balling 2,240'-2,300' MD. Well static on connections, mud weight 10.0 ppg. 7/26/2017 7/26/2017 1.50 SURFAC CASING CIRC P Circulate and condition mud, pump 40 2,370.0 2,370.0 15:30 17:00 bbl Nut Plug scouring sweep followed by 3 bottoms up @ 825 gpm, 2050 psi, 60 rpm, 3-5k Tq. Observe sweep channeling, seeing nut plug at surface —200 bbl early. Reciprocate pipe from 2,370'to 2,273' MD, 7/26/2017 7/26/2017 0.50 SURFAC CASING OWFF P Observe well for flow, 30 minutes 2,370.0 2,370.0 17:00 17:30 static with 10.0 ppg. Page 2146 ReportPrinted: 1 011 612 01 7 . perations Summary (with Timelog . epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log I Stan DepN Stan Time End Time our (hr) Phase Op Code Aaevfty Code Time P-T-X Operation (flKa) End DepM (flKa) 7/26/2017 7/27/2017 6.50 SURFAC CASING BKRM P Backream out of hole from 2,370' MD 2,370.0 1,691.0 17:30 00:00 to 1,691' MD per plan @ 800 gpm, 1980 psi, 40 rpm 2-4k. Steady cuttings load over shakers with intermittent unloading. Observe torque and pressure peaks as BHA backreams through slide areas. 7/27/2017 7/27/2017 1.50 SURFAC CASING CIRC P Pump 36 bbl Nut Plug scouring sweep 1,691.0 1,592.0 00:00 01:30 around @ 800 gpm, 1830 psi, 40 rpm, 3.5K Tq. Reciprocate stand from 1,691' MD to 1,592' MD. P/U=135k, S/0=115k. Shut down and observe well static. 7/27/2017 7/27/2017 0.75 SURFAC CASING PMPO P Attempt to POOH on elevators, pull 1,592.0 1,356.0 01:30 02:15 35k then 45k over firm @ 1,509' MD 2x. Pump out from 1,592' MD to 1,356' MD (base permafrost) @ 500 gpm, 830 psi, pressuring up to 1090 psi, motor biting and minor packoffs and overpull. 7/27/2017 7/27/2017 2.50 SURFAC CASING BKRM P Backream out from 1,356' MD to 450 1,356.0 450.0 02:15 04:45 MD 500-600 gm, 830-0960 psi, 40 rpm, 5k-1.5k Tq. Hole begin unloading @ 830' MD to 460' MD. Mostly large clay returns, start seeing some wood and gravel on shakers mixed with Gay @ 600450' MD. 7/27/2017 7/27/2017 0.75 SURFAC CASING PMPO P Pump out from 450' MD to 98' MD, 450.0 9-8-0 04:45 05:30 standing back HWDP and collars. Pump with BHA inside conductor 400 gpm, 260 psi, 15 rpm, .5k Tq to clean conductor / BHA. Good clay returns. 7/27/2017 7/27/2017 1.50 SURFAC CASING BHAH P UD BHA per SLB DD/ MWD and 98.0 0.0 05:30 07:00 GWD. 7/27/2017 7/27/2017 1.00 SURFAC CASING BHAH P Clean and clear rig floor, UD BHA 0.0 0.0 07:00 08:00 tools and equipment. 727/2017 7/27/2017 1.00 SURFAC CASING RURD P P/U and R/U Volant CRT, bail 0.0 0.0 08:00 09:00 extensions, 13-3/8" casing elevators and Varco 350T slips. 7/27/2017 7/27/2017 0.25 SURFAC CASING SFTY P PJSM on running casing. 0.0 0.0 09:00 09:15 7/272017 7/27/2017 2.25 SURFAC CASING PUTB P P/U 13-3/8" shoe jt, shoe track, float 0.0 540.0 09:15 11:30 collar and Bakerlock joint. Establish circulation through shoe track and check floats good. P/U and RIH with 13-3/8" 68# H563 casing to 540' MD, string taking weight. Decision made to wash down. 7/27/2017 7/27/2017 0.50 SURFAC CASING PUTB T Establish circulation @ 3.3 bpm, 110 540.0 558.0 11:30 12:00 psi and wash down to 558' MD. S/0=80k. 7272017 7272017 0.50 SURFAC CASING PUTB T Continue P/U and run casing from 558.0 590.0 12:00 12:30 558' MD to 590' MD, washing @ 3 bpm, 50 psi. S/0=70-80k. 7/27/2017 7/27/2017 1.50 SURFAC CASING PUTB P Run casing with Volant CRT from 590' 590.0 840.0 12:30 14:00 to 840' without pump, string still laking weight total loss of slack off. Page 3145 Report Printed: 10/16/2017 ..perations Summary (with Timelog c epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time End Time our (hr) Phase Op Corte Activity Corte Time P -T -X Operation (mcB) End Depth (fiKB) 7/27/2017 7/27/2017 7.00 SURFAC CASING PUTS P Continue washing in hole from 840' 640.0 1,400.0 14:00 21:00 MD tol,400' MD @ 3 bpm, 80-90 psi, S/0=100 -120k steady running at slower speed -100 fph. 7/27/2017 7/27/2017 1.00 SURFAC CASING CIRC P Circulate and condition mud, stage 1,400.0 1,400.0 21:00 22:00 pump rate up to 6 bpm, 140 psi. Observe mud thinned out, ME condition pits and hole. 7/27/2017 7/28/2017 2.00 SURFAC CASING PUTS P PIU and RIH with casing from 1,400' 1,400.0 1,920.0 22:00 00:00 MD to 1,920' MD, S/0=138k, 47 joints in hole. 7/28/2017 7/28/2017 1.25 SURFAC CASING PUTS P P/U and RIH with 13-3/8" casing from 1,920.0 2,281.0 00:00 01:15 1,920' MD to 2,281' MD. 7/28/2017 7/28/2017 0.75 SURFAC CASING HOSO P Make up hanger and split landing joint. 2,281.0 2,359.8 01:15 02:00 Break out split joint with 24k, make back up to 3k. RIH and land casing on hanger @ 2,359.77' MD. P/U=185k, S/0=165k. 7/28/2017 7/28/2017 2.00 SURFAC CEMENT CIRC P Circulate and condition for cement job, 2,359.8 2,359.8 02:00 04:00 stage from 3 to 8 bpm, 130-180 psi. SIMOPS- Rig down 13-3/8" elevators and bail extensions, dean and lay down Varco 350T slips, lay down casing equipment. 7/28/2017 7/28/2017 0.25 SURFAC CEMENT RURD P Blow down top drive, dose manual 2,359.8 2,359.8 04:00 04:15 IBOP. Rig up 1502 cement hose to swivel. 7/28/2017 7/28/2017 0.25 SURFAC CEMENT SFTY P PJSM on cement job with SLB, MI, 2,359.8 2,359.8 04:15 04:30 DDI, ASRC, CPAI. 7/28/2017 7/28/2017 0.50 SURFAC CEMENT CIRC P Circulate and condition for cement job, 2,359.8 2,359.8 04:30 05:00 8 bpm 440 psi. Pump 77 bbl Nut Pluyg and red dye marker into pipe, chase with 5 bbl from active. 7/28/2017 7/28/2017 3.25 SURFAC CEMENT CMNT P SLB pressure test lines to 3500 psi- 2,359.8 2,359.8 05:00 08:15 good. Pump 75 bbl 10.5 ppg MUdPush spacer. Shut down and drop bottom plug. SLB pumped 347.2 bbl 11 ppg Lead cement, swap to 72.4 bbl 15.8 ppg tail when good marker on shakers. Shut down drop lop plug. SLB kick out pl;ug with 20 bbl water, dg displaced with 321 bbl 10 ppg DrilPlex @ 8 bpm, 510-840 psi. Slow rate to 3 bpm 490 psi @ 310 bbl, bump plug at 3215 slks. Pressure up on plug to 990 psi and hold 5 minutes, bleed off and check Floats- Good. CIP @ 08:12 hi 171.5 bbl good 11 ppg cement to surface. 7/28/2017 7/28/2017 0.50 SURFAC CEMENT CIRC P Flush 20" annular with 90 bbl black 2,359.8 2,359.8 08:15 08:45 water @ 9-9.5 bpm and function annular 3X before leaving closed on landing joint. 7/28/2017 7/28/2017 1.25 SURFAC CEMENT WOC P Rig down 1502 cementing equipment, 2,359.8 0.0 08:45 10:00 break split landing joint and lay down top pup. Rig down VDlant CRT and lay down via beaverslide. 7/28/2017 7/28/2017 0.50 SURFAC CEMENT WOC P Clean and clear dg floor. 0.0 0.0 10:00 10:30 Page 4/45 Report Printed: 10/1612017 . perations Summary (with Timelog i,apths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr)Phase Op code Aawity Cotle Time P -T -X Operator (Wa) End Depth (re(B) 7/28/2017 7/28/2017 1.50 SURFAC CEMENT WOC P Service and inspect crown, top drive, 0.0 0.0 10:30 12:00 drawworks, iron roughneck. Perform derrick inspection. Service choke manifold. SIMOPS- Maintenance on switch in drillers console. 7/28/2017 7/28/2017 7.50 SURFAC CEMENT WOC P PJSM, Lay down 5 stands HWDP. 0.0 0.0 12:00 19:30 M/U 43 stands 5" DP and rack back in derrick. Clean and clear. 7/28/2017 7/28/2017 2.00 SURFAC CEMENT OWFF P Check pressure on annular- 18 psi. 0.0 0.0 19:30 21:30 Bleed off pressure and shut in, no pressure build. Drain and open annular. M/U landing joint pup to split joint, made up pup to 8k with rig tongs to back out landing joint. Lay down landing joint. 7/28/2017 7/28/2017 2.00 SURFAC CEMENT NUND P Lay down mousehole, Dean and 0.0 0.0 21:30 23:30 nipple down surface equipment, riser and annular. 7/28/2017 7/29/2017 0.50 SURFAC WHDBOP NUND P Prep hanger and wellhead for install. 0.0 0.0 23:30 00:00 7/29/2017 7/29/2017 5.00 SURFAC WHDBOP NUND P Nipple down surface annulus, Nipple 0.0 0.0 00:00 05:00 up wellhead and BOP stack. Changed sea) on bottom of speed head, used weight of surface annular to set completely on hanger. 7/29/2017 7/29/2017 2.00 SURFAC WHDBOP NUND P Complete N/U BOP stack and new kill 0.0 0.0 05:00 07:00 line. 7/29/2017 7/29/2017 2.00 SURFAC WHDBOP MPDA P Rig up flow box, hole fill line and Orbit 0.0 0.0 07:00 09:00 valve, annulus valves, MPD lines, drain hoses. Perform dummy run with trip nipple to verify fitment R/U Katch Kan. Install MPD test plug. 7/29/2017 7/29/2017 1.50 SURFAC WHDBOP MPDA P Make up TIW valves, Dart valve, R/U 0.0 0.0 09:00 10:30 tumbuckles. Install lower test plug, fill stack with water. 7/29/2017 7/29/2017 1.50 SURFAC WHDBOP MPDA P Test stack with NPD lest plug to 0.0 0.0 10:30 12:00 250/120-0 psi for 5 minutes each charted per MPD advisor. 7/29/2017 7/29/2017 0.50 SURFAC WHDBOP MPDA P Rig down MPD test equipment, install 0.0 0.0 12:00 12:30 trip nipple. Set 5" test joint. 7/29/2017 729/2017 1.00 SURFAC WHDBOP RURD P Rig up to test BOPE, flood stack and 0.0 0.0 12:30 13:30 choke manifold. Shell test good. 7292017 7/29/2017 4.50 SURFAC WHDBOP BOPE P Test ROPE with 5" lest joint, AOGCC 0.0 0.0 13:30 18:00 Adam Earl waived witness, BLM Zach Lyons waived witness 728 15:30 hrs. Tested all rams and annular to 250/3500 psi 10 minutes each charted. Tested 4" Demco kill, CV #1- 14, Upper and lower IBOP, HCR choke and kill, manual choke and kill, 41W IF FOSV, 4%" Dart valve, Upper and lower 3%" x 6" VBR's, 13-5/8" annular preventer, blind rams to 25013500 psi 10 minutes each. SIMOPS- Test PVT, flow sensors and alarms, Page 5145 ReportPrinted: 10/16/2017 . perations Summary (with Timelog Lapths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log De Stert Depth Start Time End Time Dur (hq Phase Op Code AcOvity Code me P -T -X Time Operation (rt End Depth (%Ka) 7/29/2017 7/29/2017 1.00 SURFAC WHDBOP BOPE P Accumulator function test, System 0.0 0.0 1800 19:00 pressure= 3000 psi, pressure after functioning all rams, annular and HCR's= 1450 psi. 200 psi attained= 28 sec, Full system recovery= 152 sec. 4 bottle N2 average= 2200 psi. Tested manual and super auto choke to 1100 psi. 7/29/2017 7/29/2017 1.00 SURFAC WHDBOP RURD P Rig down test equipment, pull test 0.0 0.0 19:00 20:00 plug. FMC set 12-3/8" ID wear bushing 7129/2017 7/29/2017 2.50 SURFAC CEMENT BHAH P P/U BHA #2 per SLB DDI MWD. 121/." 0.0 152.0 20:00 22:30 Smith MDSi619, Powerdrive 900 X6, ARC -825, ADN Vision and ProVision w/NMR to 152' MD. 7/29/2017 7/2912017 1.00 SURFAC CEMENT BHAH P PJSM, Mobilize source shield box to 152.0 523.0 22:30 23:30 dg floor. Prep and load source. Continue M/U BHA to 523' MD. P/U=95k, S/0=95k. 7/2912017 7/30/2017 0.50 SURFAC CEMENT BHAH P Lay down source shield and 523.0 523.0 23:30 00:00 equipment. 7/30/2017 7/3012017 0.75 SURFAC CEMENT TRIP P RIH with BHA#2 from 523' MD to 523.0 2,120.0 00:00 00:45 2,120' MD 7/30/2017 7/3012017 0.75 SURFAC CEMENT DHEQ P Shallow pulse test MWD 650-750 2,120.0 2,120.0 00:45 01:30 gpm, 1160-1510 psi - good. 7/30/2017 7/30/2017 1.25 SURFAC CEMENT PRTS P Blow down top drive, rig up casing test 2,120.0 2,120.0 01:30 02:45 eguipment. Flood lines and pressure test surface lines to 3800 psi. Close upper pipe rams, pressure test casing and annulus valves to 3500 psi for 30 minutes charted . Good. Blow down and rig down lines. 7130/2017 7/30/2017 0.75 SURFAC CEMENT SLPC P Cut and slip 57' drilling line. 2,120.0 2,120.0 02:45 03:30 7/30/2017 7/30/2017 0.50 SURFAC CEMENT SVRG P Service lop drive and blocks. Calibrate 2,120.0 2,120.0 03:30 04:00 block height. 7/30/2017 7/30/2017 0.50 SURFAC CEMENT COCF P Wash and ream down to float collar @ 2,120.0 2,278.0 04:00 04:30 2,278' MD, 725 gpm 1340 psi. 7/3012017 7/30/2017 2.50 SURFAC CEMENT DRLG P Drill foal collar, shoe track and shoe 2,278.0 2,370.0 04:30 07:00 725 gpm, 1340-1400 psi. Float collar - 2,280' MD, Float shoe=2,360' MD. 7/30/2017 7/30/2017 0.25 SURFAC CEMENT DDRL P Drill new formation from 2,370' MD to 2,370.0 2,390.0 07:00 07:15 2,390' MD, 2,198' TVD. ADT=.37 7/30/2017 7/30/2017 0.75 SURFAC CEMENT CIRC P CBU @ 725 gpm, 1300 psi, 60 rpm 6k 2,390.0 2,390.0 07:15 08:00 Tq. Pull up to 2,308' MD. 7/30/2017 7/30/2017 0.75 SURFAC CEMENT FIT P Rig up testing equipment, flood lines 2,390.0 2,390.0 08:00 08:45 and test to 1000 psi. Perform FIT to 16.0 ppg EMW, pumped 1.3 bbl 9.9 ppg mud, 700 psi. Hold 10 minutes, 680 psi, bled back 1.3 bbl. 7/30/2017 7/3012017 3.25 INTRMI DRILL DDRL P Directional drill 1211/." from 2,390' MD 2,390.0 2,736.0 08:45 12:00 to 2,736' MD, 2,436' TVD. ADT=2.03 hrs. Displace to 9.6 ppg LSND on the fly, obtain SPR's. PIU=130k, S/0=1 15k, R0T=118k. 150 rpm, Tq on/off--5.5k/4k. 975 gpm @ 1700 psi, 10.26 ppg ECD. Page 6145 Report Printed: 10/16/2017 . perations Summary (with Timelog L epths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log State Depth Start7une End Time our (hr) Phase Op Code Acbviry Code Tune P -T -X Operation (Wlt) End Depth(ftKB) 7/30/2017 7/30/2017 3.50 INTRMI DRILL DDRL P Directional drill 12%" from 2,736' MD 2,736.0 3,156.0 12:00 15:30 to 3,156' MD, 2,668' TVD. ADT=2.22 hrs. Bit hrs=4.62. P/U=130k, S/0=120k, ROT=130k. 180 rpm, Tq on/off-7k/4k. 975 gpm @ 1775 psi, 10.27 ppg ECD. 7/30/2017 7/30/2017 0.50 INTRMI DRILL DLOG T MADD pass from 3,156' MD to 3,061' 3,156.0 3,156.0 15:30 16:00 MD for ADN, due not reading real time data. 7/30/2017 7/31/2017 8.00 INTRMI DRILL DDRL P Directional drill 12%" from 3,156' MD 3,156.0 4,185.0 16:00 00:00 to 4,165' MD, 3,023' TVD. ADT=5.6 hrs. Bit hrs=10.22. P/U=130k, S/0=110k, ROT=132k. 180 rpm, Tq on/off--7k/5k. 975 gpm @ 2200 psi, 10.63 ppg ECD. 7/31/2017 7/31/2017 12.00 INTRMI DRILL DDRL P Directional drill 121/." from 4,165' MD 4,185.0 5,695.0 00:00 12:00 to 5,695' MD, 3,497' TVD. ADT=9.03 hrs. Bit hrs=19.25. P/U=143k, S/0=120k, ROT=132k. 180 rpm, Tq ontoff=10k/4.5k. 970 gpm @ 2500 psi, 10.75 ppg ECD. Diluting mud as necessary to maintain mud weight and drilled solids, centrifuge inop. 7/31/2017 8/1/2017 12.00 INTRMI DRILL DDRL P Directional drill 12%" from 5,695' MD 5,695.0 7,315.0 12:00 00:00 to 7,315' MD, 4,010' TVD. ADT=8.83 hrs. Bit hrs=28.08. P/U=160k, S/O=118k, R0T=130k. 180 rpm, Tq ontoff=11.5k/7.5k. 970 gpm @ 2530 psi, 10.90 ppg ECD. Begin installing W WT Super Sliders @ stand 963 (6.353'), one per joint, installing while making up stands in 90' mouse hole. 8/1/2017 8/1/2017 11.25 INTRMI DRILL DDRL P Directional drill 12%" from 7,315' MD 7,315.0 8,494.0 00:00 11:15 to 8,494' MD, 4,378' TVD. 180 rpm, 965 gpm, 2450 psi, 15k WOB, 10.31 ECD, P/U= 175, S/0= 139, ROT= 150. 10.5k TO. 8/1/2017 8/1/2017 0.50 INTRMI DRILL CIRC P Circulated and conditioned mud w/ 8,494.0 8,494.0 11:15 11:45 200 gpm, 290 psi, 60 rpm, 8.5k TO. 8/1/2017 8/2/2017 12.25 INTRMI DRILL DDRL P Drilled f/ 8,494' to 9,690' MD, 4,757' 8,494.0 9,690.0 11:45 00:00 TVD w/ 965 gpm, 2840 psi, 180 rpm, IN TO, P/U= 190, S/0= 130, ROT= 152, 10.7 ppg ECD. 8/2/2017 8/2/2017 12.00 INTRMI DRILL DDRL P Drilled f/ 9,690'to 11,342' MD, 5,281' 9,690.0 11,342.0 00:00 12:00 TVD w/ 965 gpm, 2780 psi, 180 rpm, 16k TO, P/U= 210 S/0= 135, ROT= 163, 10.67 ppg ECD. 8/2/2017 82/2017 7.00 INTRMI DRILL DDRL P Drilled f/ 11,342'to 12,354' MD, 5,602' 11,342.0 12,354.0 12:00 19:00 TVD w/ 965 gpm, 2290 psi, 180 rpm, 16k TO, P/U= 220 S/0= 135, ROT= 160, 10.71 ppg ECD. 8/2/2017 8/2/2017 3.00 INTRMI DRILL RGRP T A wash out occurred below the pop-off 12,354.0 12,354.0 19:00 22:00 on pump #1. The damaged section was removed and repaired. While repairers were made the well was circulated at 260 gpm, 515 psi, 10 rpm, and 14k TO. 1 stand was racked back per 1.5 hrs. Once repairers were complete the string was washed back to bottom. 82/2017 8I2I2017 0.50 INTRMI DRILL SVRG P Serviced rig, inspected TD, pumps, 12,354.0 12,354.0 22:00 22:30 and pop -offs. Page 7/45 ReportPrinted: 10116/2017 operations Summary (with Timelog uepths) CD5-316 W . .• Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depen Stan Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depen (NCH) 8/2/2017 8/3/2017 1.50 INTRMI DRILL DDRL P Drilled f/ 12,354' to 12,569' MD, 5,670' 12,354.0 12,569.0 22:30 00:00 TVD w/ 965 gpm, 2990 psi, 180 rpm, 19.5k TO, P/U= 235 8/0= 130, ROT= 170, 10.63 ppg ECD. 8/3/2017 8/3/2017 9.75 INTRMI DRILL DDRL P Drilled to TO f/ 12,569'to 13,848' MD, 12,569.0 13,848.0 00:00 09:45 6,070' TVD. w/ 965 gpm, 3020 psi, 180 rpm, 15k WOB, 10.6 ppg ECD, P/U= 230, S/0= 145, ROT= 170, TO= 21 k. 8/32017 8/3/2017 4.25 INTRMI CASING CIRC P Circulated well clean f/ 13,848'to 13,848.0 13,784.0 09:45 14:00 13,794' MD, w/ 965 gpm, 3120 psi, 140 rpm, 13k TO, P/U= 320, S/0= 145, ROT= 170. 8/3/2017 8/3/2017 7.00 INTRMI CASING BKRM P Attempted to POOH with no success 13,784.0 11,814.0 14:00 21:00 and BROOH H 13,794' to 11,814' MD w/ 960 gpm, 180 psi, 15/17k TO. 8/312017 8/4/2017 3.00 INTRMI CASING CIRC P Circulated and conditioned mud w/ 11,814.0 11,626.0 21:00 00:00 960 gpm, 3030 psi, 140 gpm, 12k TO, 10.8 ppg ECD. Racked back a stand after 1.5 hrs. 8/4/2017 8/4/2017 1.00 INTRMI CASING CIRC P Circulated and conditioned mud w/ 11,626.0 11,720.0 00:00 01:00 970 gpm, 2850 psi, 140 gpm, 12k TO, 10.8 ppg ECD. Racked back a stand after 1.5 his. 8/42017 8/4/2017 0.50 INTRMI CASING OWFF P OWFF and attempted to POOH on 11,720.0 11,626.0 01:00 01:30 elevators. encountered 451k overpull and dropped back down to resume BROOK 8/4/2017 8/42017 9.75 INTRMI CASING BKRM P BROOH V 11,626'to 8,800' MD w/ 11,626.0 8,800.0 01:30 11:15 965 gpm, 2870 psi, 140 rom, 17k TQ. 8/4/2017 8/42017 6.75 INTRMI CASING DLOG P BROOH f/ 8,800'to 8,450' MD while 8,800.0 8,450.0 11:15 18:00 logging the Sub97 w/ 650 gpm, 2030 psi, 140 rpm, 15k TO. 8/42017 8/4/2017 1.75 INTRMI CASING BKRM P BROOH V 8,450'to 8,328' MD w/ 960 8,450.0 8,328.0 18:00 19:45 gpm, 2400 psi, 180 rpm, 18k TO. 8/42017 8/4/2017 1.25 INTRMI CASING CIRC P Circulated 2x BU w/ 960 gpm, 2420 8,328.0 8,328.0 19:45 21:00 psi, 180 rpm, 20k TO. 8/4/2017 8/5/2017 3.00 INTRMI CASING BKRM P BROOH V 8,328'to 8,185'MD w/960 8,328.0 8,185.0 21:00 0000 gpm, 2400 psi, 180 gpm, 201k TO. Pumped a nut plug sweep at 8,255' with little returns at surface. Encountered high torque and reduced pulling rates. 8/5/2017 8/52017 12.00 INTRMI CASING BKRM T BROOH f/8,185'to 7,450' MD wl 950 8,185.0 7,450.0 00:00 12:00 gpm, 2500 psi, 180 rpm, 22k TO. Pumped 32 bbl nut plug sweep at 7,870' MD. 8/5/2017 8/6/2017 12.00 INTRMI CASING BKRM T BROOH V 7,450' to 6,801' MD w/ 960 7,450.0 6,801.0 12:00 00:00 gpm, 2480 psi, 180 rpm, 22k TO. Pumped 38 boil nut plug sweep and DrillZone at 7,350' MD. Additional nut plug sweeps at 7,150' and 7,000' MD. 8/6/2017 8/62017 13.50 INTRMI CASING BKRM T BROOHf/6,801'1o4,939'MDw/950 6,801.0 4,939.0 00:00 13:30 gpm, 2500 psi, 180 rpm, 14k TQ. 8/6/2017 8/62017 1.00 INTRMI CASING CIRC T Circulated 2x BU while hole unloaded 4,939.0 4,939.0 13:30 14:30 w/ 950 gpm, 2500 psi, 180 rpm, tOk TO. Page 8145 ReportPrinted: 10116/2017 .iperations Summary (with Timelog vepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan ognh Start Time End Time our (hp Phew Op Code Activity Code Time P -T -X Operabon (ftKB) End Depth (RK8) 81612017 817/2017 9.50 INTRMI CASING BKRM T BROOH f/ 4,939'to 4,355' MD w/ 950 4,939.0 4,355.0 14:30 00:00 gpm, 2350 psi, 180 rpm, 15k TQ. 817/2017 8/7/2017 9.50 INTRMI CASING BKRM T BROOH f/ 4,355' to 2,308' MD w/ 950 4,355.0 2,308.0 00:00 09:30 gpm, 2400 psi, 180 rpm, 20k TQ. 8/7/2017 8/712017 0.25 INTRMI CASING OWFF P OWFF, Well static. 2,308.0 2,308.0 09:30 09:45 8/7/2017 8/7/2017 0.50 INTRMI CASING CIRC P Circulate 2x BU at the shoe w/ 950 2,308.0 2,308.0 09:45 10:15 gpm, 2000 psi, 60 rpm, 4k TQ. Pumped a 40 bbl nut plug sweep. 8/7/2017 817/2017 0.50 INTRMI CASING BKRM T BROOH f/ 2,308'to 1,934'MD w/ 950 2,308.0 1,934.0 10:15 10:45 gpm, 1960 psi, 60 rpm, 3k TQ. 8/7/2017 8/7/2017 0.50 INTRMI CASING CIRC T Pump a 35 bbl nut plug sweep w/ 940 1,934.0 1,934.0 10:45 11:15 gpm, 1960 psi, 60 rpm. 8/7/2017 8/7/2017 0.25 INTRMI CASING OWFF T OWFF, Well static. 1,934.0 1,934.0 11:15 11:30 8/712017 8/7/2017 2.25 INTRMI CASING BKRM T Attempted to POOH and encountered 1,934.0 1,179.0 11:30 13:45 resistance. BROOH f/ 1,934'to 1,179' MD. Dropped 2.75" hollow drift at 1,273' MD. 8/7/2017 8/7/2017 1.00 INTRMI CASING TRIP P POOH f/ 1,179'to 523' MD. 1,179.0 523.0 13:45 14:45 8/7/2017 8/712017 0.50 INTRMI CASING OWFF P OWFF, Well Static. 523.0 523.0 14:45 15:15 817/2017 8/7/2017 0.75 INTRMI CASING TRIP P Pumped OOH f/ 523'to 217' MD w/ 523.0 217.0 15:15 16:00 6.5 bpm, 150 psi. 81712017 8/7/2017 3.00 INTRMI CASING BHAH P UD BHAand removed nukes as per 217.0 0.0 16:00 19:00 SLB. 81712017 8/7/2017 0.50 INTRMI CASING BHAH P Clean and cleared dg floor. 0.0 0.0 19:00 19:30 8/7/2017 8/712017 0.50 INTRMI CASING WWWH P M1U slack washer and flushed stack. 0.0 0.0 19:30 20:00 B/D TD. 8/7/2017 8/7/2017 1.75 INTRMI CASING BOPE P Drained stack, P/U lest joint and 0.0 0.0 20:00 21:45 installed 9.625" upper rams. 817/2017 8/7/2017 1.75 INTRMI CASING BOPE P R/U and test annular and upper 9.625" 0.0 0.0 21:45 23:30 rams w/ 9 518" test joint to 250/2500 psi and 250/3500 psi for 10 min. R/D Pest equipment. 8/7/2017 8/812017 0.50 INTRMI CASING BOPE P Installed 12.375" ID wear ring and UD 0.0 0.0 23:30 00:00 test joint. 8/8/2017 8/8/2017 3.00 INTRMI CASING PULD P M/U and R/B 20 joints of 5" HWDP. 0.0 0.0 00:00 03:00 M/U cement easy and attempted to rack back but encountered high flex in the DP. UD cmt head and long single W/ pup. 8/8/2017 8/8/2017 0.50 INTRMI CASING RURD P R/U Volant tool and 9 5/8" handling 0.0 0.0 03:00 03:30 equipment. 8/812017 8/812017 2.00 INTRMI CASING PUTS P M/U 9 5/8" shoe track, Bakor locked 0.0 211.0 03:30 05:30 the first 6 connections and checked floats. 8/8/2017 8/9/2017 18.50 INTRMI CASING PUTB P RIH wl 9 5/8" 40# L-80 BTCM liner as 211.0 9,044.0 05:30 00:00 per tally f/ 211' to 9,044' MD. Started RIH with power tongs and filling every 5 stands at 6,645' MD due to excessive wear on the Volant seal cup. 81912017 8/9/2017 5.00 INTRMI CASING PUTS P RIH w/ 9 5/8" liner f/ 9,044'to 11,814' 9,044.0 11,814.0 00:00 05:00 MD as per tally. Page 9/45 Report Printed: 10/1612017 ,jperations Summary (with Timelog uepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth StanTime End Time Dur (hp Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth mKB) 8/9/2017 8/9/2017 3.75 INTRMI CASING CIRC P Circulate a BU w/ 8 bpm, 350 psi, 11,814.0 11,814.0 05:00 08:45 P/U= 300, S/O= 175. 8/912017 819/2017 0.25 INTRM1 CASING OTHR P Performed differential stick test for 5 11,814.0 11,814.0 08:45 09:00 and 10 min. RID Volant tool. 81912017 8/9/2017 0.75 INTRMI CASING OTHR P PIU and M/U 9 5/8" liner hanger as 11,814.0 11,858.0 09:00 09:45 per Baker and fill w/ Xan -flex. Established circulation through hanger wit bpm, 250 gpm. 8/912017 8/9/2017 2.25 INTRMI CASING RUNL P RIH wit 95/8";liner on HWDP and 5" 11,858.0 13,811.0 09:45 12:00 DP f/ 11,858'to 13,811' MD 8/9/2017 8/9/2017 0.75 INTRMI CASING HOSO P M/U single, pup joint, and cmnt assy 13,811.0 13,838.0 12:00 12:45 and wash down w/ 3 bpm, 400 psi. tagged bottom and spaced out. S/O= 170. 819/2017 8/9/2017 6.25 INTRMI CEMENT CIRC P Circulated and conditioned for cmt job 13,838.0 13,838.0 12:45 19:00 w/ 7.5 bpm, 720 gpm. Reduced MW f/ 10 ppg to 9.6 ppg. Held PJSM for cmt job. 8/9/2017 8/9/2017 2.00 INTRMI CEMENT CIRC P Rigged up cmt lines and circulated 13,838.0 13,838.0 19:00 21:00 through cmt hose at 8 bpm, 690 psi, P/U= 340, S/O= 170, 8/9/2017 8/10/2017 3.00 INTRMI CEMENT CMNT P Lined up and flushed lines w/ 4.9 bbl 13,838.0 13,838.0 21:00 00:00 of water. Pressure tested lines to 4500 psi and pumped 80 bbl of 10.5 ppg MudPushll spacer followed by 434.7 bbl of 13 ppg Lead cmt and 54.2 bbl of 15.8 ppg tail cmt. Dropped top dart and chased w/ 10 bbl of water followed by displacement w/ mud from the dg at 8 bpm, 280 psi. "Plug Bumped and Full Returns" 8/10/2017 8/10/2017 2.00 INTRMI CEMENT CMNT P Displaced cmt with rig pumps at 8 13,838.0 13,838.0 00:00 02:00 bpm, 290 psi and slowed to 3 bpm to latch plug at 4211 strokes and resumed 7 bpm. Slowed pumps to 3 bpm and bumped plug @ 8991 strokes. Pressured up to 1100 psi and held for 5 min. Bleed off and checked floats, floats held. Full returns to surface. Liner top @ 1987' MD, Liner shoe @ 13838' MD. 8/1012017 8/102017 1.50 INTRMI CEMENT PACK P Pressured up to 2600 psi and SIO 60k 13,838.0 13,838.0 02:00 03:30 to set hanger. Observed dogs shear. Continued up to 4000 psi to release running tool. P/U= 120, S/0= 80. Bleed off, BID, and RID cmnt lines. Rotated at 20 rpm and set down 50k to set ZAP packer. Closed annular and pressured up the annulus to 3000 psi to test packer seals. Held for 10 min and charted. Bleed off and UD cmt head. 8/10/2017 8/10/2017 1.25 INTRMI CEMENT TRIP P Pressured up to 500 psi in the DP and 13,838.0 2,014.0 03:30 04:45 pulled 7'to see LRT pull out of seals. Pulled 35k over while attempting to pull out of liner, indicating the dogs were hanging up. Attempted 3 more times, working up the pull to 180k and pulled free from hanger. Dropped wiper ball. Page 10145 Report Printed: 10/16/2017 operations Summary (with Timelog vepths) CD5-316 . . .6 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth n De Start Time End Time our (hr) Phase O Code Op Active Code Activity Time P -T -X Operation EM Depth (flK8) 8/10/2017 8/10/2017 1.25 INTRMI CEMENT CIRC P Circulated pipe clean w/ 8-10 bpm, 2,014.0 1,811.0 0445 06:00 200 psi, P/U= 120. UD a single and RIB 1 stand to clear hanger lop. 8/10/2017 8/10/2017 0.25 INTRMI CEMENT OWFF P OWFF, Well Static. 1,811.0 1,811.0 06:00 06:15 8/10/2017 8/10/2017 1.25 INTRMI CEMENT TRIP P POOH on elevators f/ 1,81Vito 46' 1,811.0 46.0 06:15 07:30 MD. 8/10/2017 8/10/2017 0.50 INTRMI CEMENT BHAH P UD liner running tool as per Baker. 46.0 0.0 07:30 08:00 8/10/2017 8/10/2017 2.00 INTRMI CEMENT WWWH P M/U stack washer and flush stack. 0.0 0.0 08:00 10:00 M/U wear ring retrieval tool and attempt to engage wear ring. Had to P/U spring loaded running toll due to damage caused by 9 5/8" casing run. Engaged and pulled out. 8/10/2017 8/10/2017 1.00 INTRMI CEMENT BOPE P Changed out upper rams to 3 1/2" x 6" 0.0 0.0 10:00 11:00 VBRs. SimOps, changed out saver sub. 8/10/2017 8/10/2017 0.50 INTRMI CEMENT RURD P Clean and clear rig floor. 0.0 0.0 11:00 11:30 8/10/2017 8/10/2017 0.50 INTRMI CEMENT SVRG P Service TD and blocks. 0.0 0.0 11:30 12:00 8/10/2017 8/10/2017 3.00 INTRMI WHDBOP RURD T WU 5" test joint and installed test 0.0 0.0 12:00 15:00 plug. Pressured up and observed plug was leaking. changed out test plug seals and reinstalled. Noted that annulus had a slight flow and suspected thermal expansion. 8/10/2017 8/10/2017 1.75 INTRMI WHDBOP OWFF T monitored well and recorded fluid flow. 0.0 0.0 15:00 16:45 Initial flow= .15 bph, Final flow= .07 bph. Confirmed thermal expansion. 8/10/2017 8/10/2017 5.50 INTRMI WHDBOP BOPE P BOPE Tests witness waived by 0.0 0.0 16:45 22:15 AOGCC Matt Herrera and ELM Mutasim Elganzoory. Tested BOPE w/ 5" TJ and tested annular, lower rams, valves 1-14, manual choke and kill, manual IBOP, 4" demes, 5" FOSV and blind rams to 250/3500 psi for 5 min. Tested upper rams, HCR kill, Auto IBOP, and needle valve to 250/3500 psi for 10 min. Tested w/ 3 1/2" test joint against annular, upper rams and lower rams, to 250/3500 psi for 10 min. Performed koomy test: Initial = 3050 psi, built 200 psi in 30 sec, full recharge in 148 sec. N2 average= 2187 psi. Draw down manual and supper chokes to 1100 psi. Monitored annulus during test, well static at 21:20. 8/10/2017 8/10/2017 0.75 INTRMI WHDBOP RURD P RID test equipment, pull test plug and 0.0 0.0 22:15 23:00 B/D lines. Installed 12.375" ID wear ring. 8/10/2017 8/11/2017 1.00 INTRMI CEMENT BHAH P M/U 8 1/2" clean out BHA to 191' MD. 0.0 191.0 23:00 00:00 8/11/2017 8/11/2017 0.50 INTRMI CEMENT TRIP P RIH w/ 5" HWDP from derrick f/ 191' 191.0 926.0 00:00 00:30 to 926' MD. Page 11145 ReportPrinted: 10/16/2017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Stan Depth (9KB) End Depth (N(B) 8/11/2017 8/11/2017 7.75 INTRMI CEMENT PULD P Single in hole wl 5" DP from pipe shed 926.0 6,592.0 00:30 08:15 f/ 926' to 6,592' MD. P/U= 175, S/0=100, filling pipe every 20 stands. 8/11/2017 8/11/2017 5.00 INTRMI CEMENT TRIP P RIHf/6,952'to13,444'MDoutofthe 6,592.0 13,444.0 08:15 13:15 derrick. Adjusted SS and replaced f/ 11,939' and on. 8/11/2017 8111/2017 1.00 INTRMI CEMENT SLPC P Slip and cut 75' of drill line. 13,444.0 13,444.0 13:15 14:15 8/11/2017 8/11/2017 0.50 INTRMI CEMENT SVRG P serviced TD and draw works. 13,444.0 13,444.0 14:15 14:45 8/11/2017 8/11/2017 0.50 INTRMI CEMENT RURD P Installed Bakers weight indicator on 13,444.0 13,444.0 14:45 15:15 the dead man and calibrated block height. 8/11/2017 8/11/2017 1.25 INTRMI CEMENT PRTS P R/U and pressure test 13 3/8" x 9 5/8" 13,444.0 13,444.0 15:15 16:30 liner to 3000 psi and held for 30 min. Test good. R/D test equipment. 8/11/2017 8/11/2017 1.25 INTRMI CEMENT COCF P Wash and ream If 13,444'to 13,667' 13,444.0 13,667.0 16:30 17:45 MD w1400 gpm, 930 psi, 60 rpm, 20k TO. P/U= 255, S/0= 100, ROT= 175. 8/11/2017 8/12/2017 6.25 INTRMI CEMENT DRLG P Drilled out shoe track fl 13,667' to 13,667.0 13,716.0 17:45 00:00 13,716' MD w/ 400-700 gpm, 920- 2275 psi, 60-80 rpm, 22-29k TQ. encountered landing collar at 13,667' and float collar at 13,714' MD 8/12/2017 8/12/2017 2.50 INTRMI CEMENT DRLG P Continue drilling out shoe track f/ 13,716.0 13,848.0 00:00 02:30 13,716'to 13,848' MD wl 500 gpm, 2500 psi, 60 rpm, 27k TO, 5-12k WOB. 8112/2017 8/12/2017 1.00 INTRMI CEMENT DDRL P Drilled 20' of new formation f/ 13,848' 13,716.0 13,869.0 02:30 03:30 to 13,869' MD w/ 500 gpm, 1510 psi, 120 rpm, 25k TQ, 35k WOB. 8/12/2017 8/12/2017 1.00 INTRMI CEMENT CIRC P Circulate BU w/ 650 gpm, 2020 psi, 13,869.0 13,820.0 03:30 04:30 P/U= 320, S/0= 98, ROT= 170. 8/12/2017 8/12/2017 1.00 INTRMI CEMENT FIT P R/U and perform FIT to 12.5 ppg 13,820.0 13,820.0 04:30 05:30 EMW wl 920 psi, 9.6 ppg MW, and 6068' TVD. Held for 10 min and R/D. 8/12/2017 8/12/2017 1.00 PROD1 DRILL TRIP P POOH f/ 13,820'to 13,349' MD on 13,820.0 13,349.0 05:30 06:30 elevators. 8/12/2017 8/1212017 0.25 PROD1 DRILL CIRC P Pumped 23.5 bbl of 10.6 ppg dry job. 13,349.0 13,349.0 06:30 06:45 8/12/2017 8/12/2017 7.25 PROD1 DRILL TRIP P POOH f/ 13,349'to 926' MD on 13,349.0 926.0 06:45 j 14:00 elevators. 8/12/2017 8/12/2017 1.75 PROD1 DRILL SHAH P UD 5 stands of 5" HWDP, racked 926.0 0.0 14:00 15:45 back 5 stands of HWDP, and UD clean out BHA. 8/12/2017 8/12/2017 5.50 PROD1 DRILL RURD P Cleared floor and installed tee on pipe 0.0 0.0 15:45 21:15 stand w/ Baker pressure transducer for MWD. 8/12/2017 8/12/2017 0.75 PROD1 DRILL SEQP P Pressure test stand pipe w/ tee to 0.0 0.0 21:15 22:00 3500 psi. SimOps, PIU tools to rig floor. 6/1212017 8/1212017 0.25 PROD1 DRILL SFTY P Held PJSM for making up Baker BHA. 0.0 0.0 22:00 22:15 Discussed differences in tools and plan for handling nukes. 8/12/2017 8/13/2017 1.75 1 PROD1 DRILL BHAH P M/U 6" x 8 1/2" Pilot hole BHA as per 0.0 99.0 22:15 00:00 Baker to 99'. Page 12145 ReportPrinted: 1 0/1 612 01 7 %operations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start DePN start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (flXB) End Depth (MB) 8/13/2017 8/13/2017 1.00 PROW DRILL SHAH P Plug in MWD and under reamer. Test 0.0 99.0 00:00 01:00 on surface and function U1R Cutters. 8/13/2017 8/13/2017 0.50 PROD1 DRILL SHAH P M/U BHA as per Baker f/ 99' to 141' 99.0 141.0 01:00 01:30 MD. 8/13/2017 8/13/2017 0.25 PROD1 DRILL SHAH P Load radioactive sources in to BHA. 141.0 141.0 01:30 01:45 8/13/2017 8/13/2017 0.75 PROD1 DRILL SHAH P Continue to M/U BHA f/ 141' to 293' 141.0 293.0 01:45 02:30 MD. 8/13/2017 8/13/2017 1.00 PROD1 DRILL SHAH P Plug in to flow diverter and test at 293.0 293.0 02:30 03:30 surface. 8/13/2017 8/7312017 0.75 PROD1 DRILL TRIP P RIH f/ 293'to 1,693' MD from derrick. 293.0 1,693.0 03:30 04:15 8/13/2017 8/13/2017 1.00 PROD1 DRILL DHEQ P Shallow tested tools w/300 gpm, 1510 1,693.0 1,693.0 04:15 05:15 psi, 30 rpm, 1.7k TO. Functioned flow diverter and observed psi drop. P/U= 110, S/0= 102, ROT= 105. 8/13/2017 8/13/2017 3.75 PRODt DRILL TRIP P RIH f/ 1,693' to 8,850' MD filling pipe 1,693.0 81850.0 05:15 09:00 every 20 stands. Started taking weight at 8,850' MD. 8/13/2017 8/13/2017 0.50 PROD1 DRILL REAM P washed and reamed down f/ 8,850' to 8,850.0 8,945.0 09:00 09:30 8,945' MD w/ 170 gpm, 10 psi, 40 rpm, 16.5k TO. 8/1312017 8/13/2017 2.50 PROD1 DRILL TRIP P RIH f/8,945'to 12,518' MD. 8,945.0 12,518.0 09:30 12:00 8/13/2017 8/13/2017 0.50 PROD1 DRILL CIRC P Circulated at 300 gpm, 1600 psi, to 12,518.0 12,518.0 12:00 12:30 regain S/O. 8/13/2017 8113/2017 2.25 PROD1 DRILL TRIP P RIH f/ 12,518' to 13,835' MD. 12,518.0 13,835.0 12:30 14:45 Calculated displacement = 118 bbl, Actual = 124 bbl. 8/13/2017 8/13/2017 4.00 PROD1 DRILL DISP P Displaced well to new 9.6 ppg LSND 13,835.0 13,835.0 14:45 18:45 at 3.7-6 bpm, 620-1300 psi, 30 rpm, 18.5k TQ. 8/13/2017 8/13/2017 0.50 PROD1 DRILL CIRC P took SPRs and washed down f/ 13,835.0 13,869.0 18:45 19:15 13,835'to 13,869' MD at 300 gpm, 1640 psi, 30 rpm, 15k TO. 8/13/2017 8/13/2017 2.75 PROD1 DRILL DDRL P Drilled f/ 13,869'to 13,965' MD, 6108' 13,869.0 13,965.0 19:15 22:00 TVD. 8/13/2017 8/13/2017 0.50 PROD1 DRILL CIRC P P/U to 13,934' and sent down link to 13,965.0 13,965.0 22:00 22:30 open 8 3/4" under reamer w/ 550 gpm, 2120 psi. Observed reamer OD increase to 8.75" on MWD, started rpm at 40 and reamed down. observed torque increase to 18k at 13,948' MD. Pi cut rotary and S/O to confirm reamer was open. "Reamer Open" 8/13/2017 8/14/2017 1.50 PROD1 DRILL REAM P Ream back to bottom V 13,948' to 13,965.0 13,965.0 22:30 00:00 13,960' MD w/ 620 gpm, 2420 psi, 90 rpm, 14k TQ. 8/14/2017 8/14/2017 0.25 PROD1 DRILL REAM P Ream back to bottom f/ 13,960' to 13,965.0 13,965.0 00:00 00:15 13,965' MD w/ 620 gpm, 2420 psi, 90 rpm, 14k TO. 8/14/2017 11.75 PROD1 DRILL DDRL P Drill fl 13,965'to 14,633' MD, 6295' 13,965.0 14,633.0 00:15 12:00 TVD wl 700 gpm, 3190 psi, 150rpm, 18/14/2017 20k WOB, 11.17 ppg ECD, P/U= 272, S/0= 118, ROT= 170. Page 13146 ReportPrinted: 1011612017 operations Summary (with Timelog Uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log I Stan Depth Start Time EmUnme DW (hr) Phase op Cade Activity Code Time P -T -X Operation Iti(B EM Depth(ftKB) 8/14/2017 8/15/2017 12.00 PROD1 DRILL DDRL P Drill fl 14,633' to 15,295' MD, 6,456' 14,633.0 15,295.0 12:00 00:00 TVD w/ 650 gpm, 3080 psi, 155rpm, 22k WOB, 11.11 ppg ECD, PIU= 245, S/0= 128, ROT= 175. 8/15/2017 8/15/2017 12.00 PROD1 DRILL DDRL P Directional drill 6" x 8%" pilot hole per 15,295.0 16,128.0 00:00 12:00 program from 15,295' MD to 16,128' MD, 6,556' TVD. ADT=10.0 hrs, P/U=272k, S/0=120k, ROT=172k, 165 rpm, Tq on/off=21.5k/17k @ 16,128'. 625 gpm, 2900 psi, MWD ECD= 11.2 ppg EMW. Mud weight 9.619.7 in/out. 8/15/2017 8/16/2017 12.00 PROD1 DRILL DDRL P Directional drill 6" x 8aW pilot hole per 16,128.0 17,098.0 12:00 00:00 program from 16,128' MD to 17,198' MD, 6,896' TVD. ADT=9.6 hrs, P/U=278k, S/0=127k, ROT=176k, 165 rpm, Tq on/off-24.5k/12.5 @ 17,035'. 625 gpm, 3100 psi, MWD ECD= 11.35 ppg EMW. Mud weight 9.7/9.8 intout. Recorded 49 bbl seepage losses to formation for the day, notably around 16,200' MD. 8/16/2017 8/16/2017 1.25 PROD1 DRILL DDRL P Directional drill 6" x 8%" pilot hole per 17,098.0 17,224.0 00:00 01:15 program from 17,098' MD to 17,224' MD, 6,926' TVD. ADT=1.2 hrs, PIU=278k, S/0=127k, ROT=176k, 165 rpm, Tq on/off-24.5k/12.5 @ 17,035'. 625 gpm, 3100 psi, MWD ECD= 11.35 ppg EMW. Mud weight 9.7/9.8 infout. 8/16/2017 8/16/2017 1.25 PROD1 DRILL CIRC P CBU @ 625 gpm, 3170 psi, reduce to 17,224.0 17,224.0 01:15 02:30 60 rpm, 13.5k Tq. Downlink to de- activate under reamer and steering head ribs. P/U=272k, 8/0=145k, ROT=175k. SIMOPS- PJSM on pulling trip nipple and install MPD bearing. 8/16/2017 8/16/2017 0.25 PROD1 DRILL OWFF P Monitor well for Bow- static with 9.8 17,224.0 17,224.0 02:30 02:45 ppg mud in hole. 811612017 8/1612017 0.50 PROD? DRILL MPDA P Pull trip nipple and install MPD 17,224.0 17,224.0 02:45 03:15 element. 8/16/2017 8/1612017 0.75 PROD1 DRILL CIRC P Circulate additional .75 BU @ 625 17,224.0 17,224.0 03:15 04:00 gpm, 3210 psi, 50 rpm 13k. MPD advisor tuned MPD chokes, BOT downlink to activate under reamer and steering head ribs. Break in MPD bearing. 8116/2017 8/16/2017 8.00 PROD1 DRILL DDRL P Directional drill 6" x 8%" pilot hole per 17,224.0 17,690.0 04:00 12:00 program from 17,224' MD to 17,690' MD, 7,040' TVD. ADT=6.1 hrs, P/U=272k, S/0=140k, ROT=175k, 165 rpm, Tq on/off-25.5k/15 @ 17,690'. 625 gpm, 3470 psi, MWD ECD= 11.63 ppg EMW. Increase mud weight to 10.0 ppg targeting 11.5 ppg EMW ECD. Holding 400-480 psi annular pressure on connections to maintain CBHP. Page 14/45 Report Printed: 10/16/2017 operations Summary (with Timelog L,epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Shin Depth Stan Tena End Time our (hr) Phase Op Code Activity Cods Time P -T -X Opemlron axa End Depth (flxB) 8/16/2017 8/17/2017 12.00 PROD1 DRILL DDRL P Directional drill 6" x 8%" pilot hole per 17,690.0 18,355.0 12:00 00:00 program from 17,690' MD to 18,355' MD, 7,203' TVD. ADT=9.9 hrs, R0T=176k, 165 rpm, Tq on/off-,29k/15 @ 18,355'. 625 gpm, 3250 psi, MWD ECD= 11.60 ppg EMW. Maintain mud weight to 10.0 ppg targeting 11.5 ppg EMW ECD. Holding 400-480 psi annular pressure on connections to maintain CBHP. No daily recordable losses 8/17/2017 8/17/2017 12.00 PROD1 DRILL DDRL P Directional drill 6" x 8e/." pilot hole per 18,355.0 18,922.0 00:00 12:00 program from 18,355' MD to 18,922' MD, 7,338' TVD. ADT=9.6 hrs, R0T=175k, 155 rpm, Tq onloff-26.5k//9 @ 18,922'. 650 gpm, 3400 psi, MWD ECD= 11.58 ppg EMW. Maintain mud weight @ 10.0 ppg targeting 11.5 ppg EMW ECD. Holding 480 psi annular pressure on connections to maintain CBHP. 8/1712017 8/182017 12.00 PRODt DRILL DDRL P Directional drill 6" x 83/4" pilot hole per 18,922.0 19,088.0 12:00 00:00 program from 18,922' MD to 19,088' MD, 7,374' TVD. ADT=9.2 hrs, R0T=175k, 155 rpm, Tq on/off=26.5k/15 @ 18,922'. 650 gpm, 3400 psi, MWD ECD= 11.51 ppg EMW. Using MPD chokes to maintain 11.5 ECD due low cuttings load. Drastically reduced ROP from 18,900' MD, WOB appears stacked on reamer, litte weight getting to pilot bit. Vary RPM from 60-170, WOB up to 30k, 8/18/2017 8/18/2017 12.00 PROD1 DRILL DDRL P Directional drill 6" x 8%" pilot hole per 19,088.0 19,292.0 00:00 12:00 program from 19,088' MD to 19,292' MD, 7,413' TVD. ADT=8.3 hrs, ROT=175k, 155 rpm, Tq on/off-27k/17.5 @ 19,296'. 350-700 gpm, (diverter open/closed) 2800- 3600 psi, MWD ECD= 11.51 ppg EMW. Using MPD chokes to maintain 11.5 ECD due low cuttings load. Reduced ROP drilling hard streaks first observed with pilot bit, peaks on bulk density and res, followed by slow ROP as under reamer drills through. Hard streak @ 19,210'-19,240'. 8/18/2017 8/18/2017 1.25 PROD1 DRILL DDRL P Continue drilling from 19,292' MD to 19,292.0 19,296.0 12:00 13:15 19,296' MD, Under -reamer on hard streak. 8/18/2017 8/18/2017 0.50 PROD1 DRILL SVRG P Circulate and condition @ 345 gpm, 19,296.0 19,296.0 13:15 13:45 2880 psi via head pin while C/O wash pipe on top drive. 8/18/2017 8/18/2017 1.25 PROD1 DRILL DDRL P Continue drilling from 19,296' MD to 19,296.0 19,299.0 13:45 15:00 19,299' MD, ADT .5 hrs. Page 15145 ReportPrinted: 10/16=17 _ - operations Summary (with Timelog Uepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Tlme End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (RKS) End Depth(ftKe) 8/18/2017 8/18/2017 1.00 PRODt DRILL RGRP T Repair pinhole washout on high 19,299.0 19,299.0 15:00 16:00 pressure mud line in pump room. Isolate pump 2, pump 3 bpm 1200 psi via cement line holding 450 psi back pressure. Slack off w/o rotation 120k, observe Super Slider clamp movement on middle joint of stand 197. Decision to remove super sliders from 197 on. Last SS on bottom joint of stand 197. 8/18/2017 8/18/2017 0.75 PROD1 DRILL RGRP T Pressure test mud lines to 4200 psi 19,299.0 19,299.0 16:00 16:45 from pump room to top drive. SIMOPS- Remove W WT SS from stand 198. 811812017 8/19/2017 7.25 PROD? DRILL DDRL P Directional drill 6" x 814." pilot hole per 19,299.0 19,417.0 16:45 00:00 program from 19,299' MD to 19,417' MD, 7,435' TVD. ADT=6.2 his, R0T=175k, 165 rpm, Tq on/off--27k/18 @ 19,400'. 700 gpm, diverter open 3670 psi, MWD ECD= 11.66 ppg EMW. Using MPD chokes to maintain 11.5 ECD due low cuttings load. Penetrate Kup C cap — 19,417' MD. 8119/2017 8/19/2017 3.00 PRODi DRILL DDRL P Directional drill 6" x 8%" pilot hole per 19,417.0 19,537.0 00:00 03:00 program from 19,417' MD to TD at 19,537' MD, 7,457' TVD. ADT=2.7 hrs, ROT=175k, 165 rpm, Tq ontoff=27k119.5 @ 19,537'. 700 gpm, diverter open 3710 psi, MWD ECD= 11.76 ppg EMW. Top Kup C ^19,417', bottom —19,460' MD, —5 ft TVD thickness. 8119/2017 8/19/2017 0.75 FROM PLUG PMPO P Pump BHA out from 19,537' MD to 19,537.0 19,488.0 03:00 03:45 19,488' MD @ 350 gpm, 3030 psi (Sent command and closed underreamer. Indicated UR dia change from 8.875" to 5.875")(Sent command and shut down steering head, ribs offf) 811912017 8/19/2017 1.75 PROM PLUG CIRC P Continue circulate 1.5 bottoms up Q 19,488.0 19,394.0 03:45 05:30 675-750 gpm, 3590-4040 psi, 50-120 rpm varying for tool shock. 20.5k- 23.5k Tq. Work stand up to 19,394' MD and rack back. 8/192017 8/1912017 1.25 PROM PLUG OWFF P Formation fingerprint. Space out tool 19,394.0 19,363.0 05:30 06:45 joint for well control @ 19,363' MD. Pumps down holding 470 psi annular pressure. Line up to trip tank and slowly bleed off 2 bbl to trip tank in 16 minutes, opening choke slowly to 200 psi and shut in after 1 bbl back. Shut in and monitor annular pressure build from 200 psi to 422 psi stable in 50 minutes. Rotate 5 rpm 17.5k Tq during fingerprint. Page 16145 Report Printed: 10/1612017 operations Summary (with Timelog uepths) CD5-316 . ..• Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Stan Time EM Time our (hr) Phase Op Code Activity Corte Time P -T -X Operation (h(B) End Depth (ta(B) 8/19/2017 8/19/2017 0.25 PROW PLUG CIRC T Attempt to establish circulation, ramp 19,363.0 19,363.0 06:45 07:00 up @ 3 bpm 1300 psi, observe chokes dosing and return flow drop off, pressure increasing and coinciding torquing up on string to 31.5k indicating packing off during ramp up. S/D and bleed pressure. Re -attempt ramp up to 600 gpm, 3540 psi @ 50- 120 rpm, 21.5-35k Tq. Packing off and observe 37 bbl pumped away. Pumps and rotary off to close flow diverter. Re -attempt to ramp up connection without success, packing off. 8/1912017 8/19/2017 1.75 PROD1 PLUG CIRC T Line up #1 pump on MPDE to hold 19,363.0 19,363.0 07:00 08:45 dynamic annular pressure control, maintaining 480 psi on formation. Attempt to gain circulation @.2-.7 bpm, 770-930 psi, still packing off. Hold DP pressure and work string until pressure equalizes with annular pressure. Repeat and attempt to regain circulation. 8/19/2017 8/1912017 2.00 PROD1 PLUG CIRC T Increase annular pressure to 520 psi 19,363.0 19,363.0 08:45 10:45 and continue attempt to regain circulation, .3-.7 bpm, 770-930 psi. Continue to work string and allow pressure to equalize. Continue packing off and not making headway, -6' of pipe movement. 8/1912017 8/19/2017 1.25 PROD1 PLUG SMPD T Begin working string out of hole while 19,363.0 19,110.0 10:45 12:00 attempting to regain circulation. Rotate 20 rpm, 18-231k Tq, .4 bpm, 860 psi packing off. POOH holding 520 psi on annulus and 600-700 psi on drill pipe while working pipe up to 19,110' MD. P/U=345k, SI0=110k. 8/1912017 8/19/2017 1.50 PROD1 PLUG SMPD T Continue working string out of hole 19,110.0 18,830.0 12:00 13:30 from 19,110' MD to 18,830' MD holding 520 psi annular pressure and 700 psi on drill string. P/U=325-340k. 8/19/2017 8/19/2017 1.50 PRODi PLUG CIRC T Establish circulation @ 1.5 bpm 1070 18,830.0 18,828.0 13:30 15:00 psi, 39 flow out, stage rate up to 8 bpm, 2730 psi with full returns. 11.55 ppg ECD. Reciprocate pipe from 18,900'-18,828' MD. 8/1912017 8119/2017 2.00 PROD1 PLUG CIRC P With full returns, shut down and open 18,828.0 18,828.0 15:00 17:00 diverter for full flow, stage up to 700 gpm, 3730 psi. Initiate rotary up to 120 rpm, 20k Tq, 11.65 ppg ECD reciprocate pipe. 8/19/2017 8/1912017 5.50 PROD1 PLUG CIRC P Begin weighting up mud system from 18,828.0 18,828.0 17:00 22:30 10.0 ppg to 10.7 ppg with 14.7 ppg spike fluid. Continue weight up to 11.3 ppg with bulk barite. Initial rate 625 gpm 3140 psi, 120 rpm, 21k Tq. Reduce flow rate as required down to 520 gpm 2600 psi (lowest MWD signal) to maintain <12.5 ppg ECD. Page 17145 ReportPrinted: 1011612017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Stmt Time End Time Dur (hr) Phase Op Code Agivity Code Time P -T -x Operation (ftKB) EM Depth (ftKB) 8/1912017 8/20/2017 1.50 PROD1 PLUG CIRC P Shut down and close flow diverter, in 18,828.0 18,828.0 22:30 00:00 order to maintain MWD signal. Continue weight up @ 350 gpm, 2910 psi, 120 rpm, 16k Tq, ECD <12.5 ppg EMW. P/U=325k, S/0=122k, ROT=180k. 8/20/2017 8/20/2017 1.75 PROD? PLUG CIRC P Continue weight up to 11.3 ppg @ 350 18,828.0 18,890.0 00:00 01:45 -300 gpm, 2890-2410 psi, 120 rpm, 17.5-19.5k Tq. Circvulate until even 11.3 ppg inlout. Obtain SPR's, P/U=295k, S/0=130k, ROT=180k. Space out pipe for well control to monitor. 8/20/2017 8/20/2017 0.50 PRODt PLUG OWFF P OWFF static for 30 minutes. 18,890.0 18,890.0 01:45 02:15 SIMOPS- Line up #1 Mud pump on MPDE for SOOH. 8/20/2017 8/20/2017 1.75 PROW PLUG SMPD P Strip out with MPD holding 345 psi 18,890.0 17,977.0 02:15 04:00 annular pressure pulling and 100 psi in slips from 18,890' MD to 17,977' MD, Removed 4 super sliders from stands #191 top, bottom, #186 middle, #185 middle due clamps sliding up near box end of joints. 8/2012017 8/20/2017 8.00 PROD1 PLUG SMPD T Continue stripping out from 17,977' 17,977.0 17,163.0 04:00 12:00 MD to 17,163' MD holding 345 psi annular pressure pulling and 100 psi in slips. Note: Connections torqued up, steaming and breaking with rig tongs @ 55-60k. Alternate breaks from stand #181- # 174. (NCS30 Hi friction factor dope) Removed sliders from #177 mid and #175 top due movement of top damp. Complete loss of super slider and both damps from top #176 - 3 little fish in hole. 8/20/2017 812012017 1.00 PROD1 PLUG SMPD T Continue breaking out light drill pipe 17,163.0 17,163.0 12:00 13:00 connections. Decision to pull MPD and pump out due super slider clearance issues through RCD, (Fish in hole) combined with rig/well alignment. 8/20/2017 8/20/2017 1.00 PROD1 PLUG OWFF T Shut down pump, close chokes and 17,163.0 17,163.0 13:00 14:00 monitor for pressure build, no build after some breathing back. Open to atmosphere and monitor well static 30 minutes. 8/20/2017 8/20/2017 1.00 PROD1 PLUG MPDA T PJSM, Pull RCD and install trip nipple. 17,163.0 17,163.0 14:00 1500 8/2012017 8/21/2017 9.00 PROD1 PLUG PMPO P Pump out of hole from 17,163' MD to 17,163.0 14,388.0 15:00 0000 14,828' MD @ 2 bpm, 640 psi, P/U=275-300k. Increase flow to 3 bpm as pulling speed increased to 500 fpm for hole fill, continue out to 14,388' MD. P/U=240k. Pipe breaking out normally after stand #171. Page 18/45 Report Printed: 10/16/2017 . perations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Sten Depth Siert Time End Time our(hr) Phase Op Code Activity Code Time P -T -X Operation fd<B) End Depth(flKB) 8/2112017 8/2112017 0.50 PROD1 PLUG PMPO P Pump out of hole @ 3 bpm, 820 psi 14,388.0 14,228.0 00:00 00:30 from 14,388' MD to 14,228' MD. Observing 25k overpull repeated attempts. Attempt to rotate through, 25k still present. (HWDP @ liner shoe). Note: Also start observing some dynamic sag, -11.0 ppg coming out of hole. 8/2112017 8/21/2017 4.00 PROD? PLUG BKRM P Bring pumps up to 275-350 gpm, 2040 14,228.0 13,835.0 00:30 04:30 -2710 psi and slowly BROOH from 14,228' MD to 13,835' MD, 80 rpm, 11k Tq. Stage up pump rate maintaining ECD @ 12.5 ppg, heaviest mud out 11.7+, 8/21/2017 8/21/2017 1.75 PROD1 PLUG CIRC P Circulate and condition CBU x 1 @ 13,835.0 13,835.0 04:30 06:15 350 gpm, 2710-2670 psi, 80-125 rpm, 11-15k Tq. P/U=225k, S/0=145k, ROT=170k. Watch shakers and ball mill for evidence of supersliders, small amount small pieces (<t in) of polyeurethane and aluminum. 8/21/2017 8/21/2017 1.00 PROD1 PLUG OWFF P Monitor well for flow, slight flow then 13,835.0 13,835.0 06:15 07:15 static for 30 minutes. 8/21/2017 8121/2017 2.00 PROD1 PLUG PMPO P Continue pumping out from 13,835' 13,835.0 12,547.0 07:15 09:15 MD to 12,547'@ 3 bpm, 730-670 psi. P/U=215k, S/0=145k. 8/21/2017 8/2112017 0.50 PROD1 PLUG MPDA P PJSM, Pull trip nipple and install RCD. 12,547.0 12,547.0 09:15 09:45 (All Super Sliders out of hole) 8/21/2017 8/21/2017 2.25 PROD1 PLUG SMPD P Strip out with MPD from 12,547' MD to 12,547.0 9,227.0 09:45 12:00 9,227' MD holding 250 psi pulling and 100 psi in slips. 8121/2017 8121/2017 6.00 PROD1 PLUG SMPD P Continue stripping out from 9,227' MD 9,227.0 2,350.0 12:00 18:00 to 2,350' MD holding 250 psi pulling, 80 psi slips. P/U=115k. 8/21/2017 8/21/2017 2.00 PRODi PLUG OWFF P Monitor well for flow, observe well 2,350.0 2,350.0 18:00 20:00 relaxing. Initial measurement -2 min/ Vis cup, trending down to -7 minNis cup. SIMOPS- Prep for MPD bearing removal. 8/21/2017 8121/2017 0.50 PROD1 PLUG MPDA P Remove MPD bearing, instal trip 2,350.0 2,350.0 20:00 20:30 nipple. 8/21/2017 8/21/2017 0.50 PRODi PLUG CIRC P At 2,350' MD break circulation and 2,350.0 2,350.0 20:30 21:00 stage flow up to 390 gpm, 2150 psi attempting to open flow diverter. Unsuccessfull due lack of differential pressure. 8121/2017 8/21/2017 1.50 PRODt PLUG CIRC P Pump high vis 13.2 ppg weighted 2,350.0 2,350.0 21:00 22:30 sweep, repeat attempt to open diverter using sweep for additional differential without success. Circulate until even 11.3 ppg intout @ 370 gpm, 50 rpm, 2k Tq. Unremarkable returns on shakers. 8/21/2017 8/22/2017 1.50 PROD1 PLUG TRIP P Flow check static 10 min, POOH on 2,350.0 1,040.0 22:30 00:00 elevators from 2,350' MD to 1,040' MD. 8122/2017 8/22/2017 0.75 PROD1 PLUG TRIP P POOH on trip tank from 1,040' MD to 1,040.0 327.0 00:00 00:45 752' MD. OWFF static @ 5" HWDP. Continue POOH to 327' MD Page 19146 ReportPrinted: 1011612017 .,perations Summary (with Timelog L epths) mr CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log n 91ad Depth Tm Stan Tines End Tune Dur(ht) Phaw op Cotle Activit/Code 'rMe P -T -x operatidn End Depth (PoCB) 8/22/2017 8/22/2017 0.25 PROD1 PLUG SFTY P With 8-3/8" stabilizer below wear ring, 327.0 327.0 00:45 01:00 drain stack and PIU slowly looking down stack for fish. No fish observed. SIMOPS- PJSM on UD BHA and source removal. 8/22/2017 8122/2017 1.50 PROD1 PLUG SHAH P POOH and UD BHA per Baker DD / 327.0 141.0 01:00 02:30 MWD reps from 327' MD to 141' MD. Inspect 3 nozzles on flow diverter, 1 nozzle washed out, 1 semi washed and 1 whole. 8/22/2017 8/22/2017 0.25 PROD1 PLUG SHAH P Clear floor, Baker remove and secure 141.0 0.0 02:30 02:45 source from MWD. 8/22/2017 8/22/2017 1.25 PROD1 PLUG SHAH P Contine UD BHA from 141' MD. 0.0 0.0 02:45 04:00 Observe all 3 cutter blocks on under reamer worn/ missing, no cutting structure remaining. 1 arm actuator missing. (Note: 8-3/8" Stab in gauge) 8122/2017 8/22/2017 1.75 PROD1 PLUG SHAH P Clean and Gear rig floor, remove BHA 0.0 0.0 04:00 05:45 tools and handling equipment. Rig down pressure transducer in derrick, C/O Baker to SLB transducer on mud manifold, remove encoder from draworks. 8/22/2017 8/22/2017 1.00 PROD1 PLUG RURD P R/U to run 3W' EUE cement stinger. 0.0 0.0 05:45 06:45 8/22/2017 812212017 1.25 PROW PLUG PULD P PJSM, P/U and RIH with 3%" EUE 0.0 960.0 06:45 08:00 stinger, 30 its 3f." EUE and XO's to NC50 to 960' MD. 8/22/2017 8/22/2017 1.75 PROD1 PLUG TRIP P RIH with cement slinger on 5" DP from 960.0 2,844.0 08:00 09:45 960' MD to 2,844' MD. Nolte: Observe 3%" EUE collars tagging top of liner, no more that 5k bobbles, but consistant every 31'. @ 2,592' rotated 1/4 turn with pipe handler to roll collar n to TOL. 8/2212017 8/22/2017 0.25 PROD1 PLUG SEOP P Function rams and annular @ 2,844' 2,844.0 2,844.0 09:45 10:00 MD. Fill pipe and test mud lines and stand pipe, mud manifold to 3,500 psi due changing out transducers. 8122/2017 8/22/2017 2.00 PROD1 PLUG TRIP P Continue RIH with cement string from 2,844.0 5,858.0 10:00 12:00 2,844' MD to 5,858' MD, NO and 5" DP enter TOL with ease, no more bobbles. 8/22/2017 8/22/2017 5.50 PROD1 PLUG TRIP P Continue RIH with cement string from 5,858.0 13,779.0 12:00 17:30 5,858' MD to 13,779' MD on 5" DP. Made up 6" OD string magnet and XO's on stand 52, placed 200' above liner shoe when stinger on bottom. Fill pipe every 20 stands. P/U=210k, S/0=125k. 8/22/2017 8/22/2017 4.50 PRODi PLUG CIRC P Break circulation and stage up to 8 13,779.0 13,779.0 17:30 22:00 bpm, 850 psi ICP, 940 psi FCP. linitial MW 11.3 ppg in, 11.0 ppg out due dynamic sag. Circulate until mud evened out, reciprocate pipe from 13,779' MD to 13,685' MD. Total circulated 2 bottoms up, max MW out 11.4+ ppg 8/2212017 812312017 2.00 PROD1 PLUG TRIP P Continue RIH from 13,779' MD to 13,779.0 15,716.0 22:00 00:00 15,716' MD, P/U=210k, S/0=125k. Good displacement. Page 20145 ReportPrinted: 10116/2017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Dapth Start Tme End Time our re) Phan Op Code Actvfty Corte Time PJA Operation (fiKB) Ertl Depn(dKB) 8/23/2017 8/23/2017 2.50 PROD1 PLUG TRIP P RIH with cement string from 15,716' 15,716.0 18,487.0 00:00 02:30 MD to 18,487' MD filling pipe every 20 stands. 8/23/2017 8/23/2017 1.75 PROD1 PLUG WASH P Wash down @ 3 bpm, 720 psi from 18,487.0 19,210.0 02:30 04:15 18,487' MD to 19,210' MD. At 19,210' take 7k down weight, then packing off. P/U and increase to 5 bpm, pressure up to 18700 psi, packing off. Bleed off prerssure, PIU and break over with 335k, pull up to 19,148' MD. Establish circulation .5-2 bpm, 420-1000 psi, packing off @ 2 bpm. Free pipe P/U=290k, S/0=125k. 8/23/2017 8/23/2017 1.75 PROD1 PLUG CIRC T P/U to 19,186' MD and establish 19,210.0 19,186.0 04:15 06:00 circulation, stage up from .5 to 5 bpm, 900 psi, breaking string over every few minutes while staging up. 8123/2017 8/2312017 2.25 PROD1 PLUG WASH T Start washing down @ 5 bpm, 900 psi 19,186.0 19,337.0 06:00 08:15 from 19186' MD to 19,299' MD. Packed off @ 19,299' pressire up to 1130 psi. Reduce rate to 4 bpm, P/U to 19,269' MD. Stage up to 5 bpm, 880 psi, continue washing down to 19,337' MD packing off again to 1130 psi. 8/23/2017 8123/2017 0.75 PROD1 PLUG CIRC T P/U from 19,337' MD to 19,295' MD, 19,337.0 19,205.0 08:15 09:00 attempt to regain circulation. Packing off @ 1 bpm, POOH to 19,205' MD and attempt circulation again @ 1.3 bpm packing off, Unsuccessful regaining circulation. 8/23/2017 8/23/2017 0.75 PROD? PLUG TRIP T Pull up hole from 19,205' MD to 19,205.0 18,864.0 09:00 09:45 18,864' MD, P/U=305k, S/0=128k. 8/23/2017 8/23/2017 0.25 PROD1 PLUG RURD P M/U single and pup joint to 18,912' 18,864.0 18,912.0 09:45 10:00 MD. R/U 1502 cement equipment. 8/2312017 8123/2017 2.00 PRODt PLUG CIRC P Establish circulation @ 1 bpm, 450 18,912.0 18,912.0 10:00 12:00 psi, stage rate up to 8 bpm, 1400 psi. P/U=280k, S10=125k. 8/23/2017 8/2312017 3.00 PROD1 PLUG CIRC P Continue to circulate and condition 18,912.0 18,912.0 12:00 15:00 mud for cementing @ 8 bpm, 1390 psi, reciprocate pipe from 18,912' MD to 18,872' MD. P/U-290k, S/0=1 15k. Mud weight 11.3 ppg intout. SIMOPS- Prep and PJSM on pumping cement plug. Shut down and observe well static. 8123/2017 8/23/2017 1.50 PROD1 PLUG CMNT P SLB Flood and test cement lines to 18,912.0 18,912.0 15:00 16:30 3500 psi. Mix and pump 30 bbl 12.5 ppg MudPush II, Drop Wiper ball, Mix and pump 64.6 bbl 15.8 ppg Class G cement, chase with 6.8 bbl 12.5 ppg MudPush II @ 5-6 bpm 450. Kick out with 2 bbl water. 8/23/2017 8/23/2017 1.00 PROW PLUG CMNT P Displace cement with dg pumps, 11.3 18,912.0 18,912.0 16:30 17:30 ppg LSND, stage up to 8 bpm, 950 psi ICP, 1450 psi FCP, continue to reciprocate for 226 bbl of displacement, park pipe @ 18,912' MD continue to displace, slow rate to 3 bpm 630 psi, finish displacement 291.8 bbls. Page 21145 Report Printed: 10116/20171 . perations Summary (with Timelog "pths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time End Time Dur (hr) Phase Op Cone Activity Code Time P -T -x Operation (KKB) End Depth (RKB) 8123/2017 8/23/2017 1.50 PRODt PLUG TRIP P Break 1502 equipment, observe mud 18,912.0 17,921.0 17:30 19:00 slowly falling in DP. POOH on elevators from 18,912' MD to 17,921' MD @ 1000 fpm, P/U=300-315k. 8/23/2017 8/23/2017 3.00 PROD1 PLUG CIRC P Insert wiper ball, pump 25 bbl water 17,921.0 17,921.0 19:00 22:00 behind, followed by 11.3 ppg LSND, stage pump up to 10 bpm, 1430 psi. Circulate 1.25 x full circulation until 11.3 ppg in/out. Observe elevated ph, and peak 11.4 ppg out. No MudPush or cement observed. 8/23/2017 8/24/2017 2.00 PROD1 PLUG TRIP P Observe well static, POOH on 17,921.0 16,705.0 22:00 00:00 elevators from 17,921' MD to 16,705' MD MD removing supersliders from each joint. 8/24/2017 8/24/2017 3.00 FROM PLUG TRIP P Continue POOH removing 16,705.0 13,590.0 00:00 03:00 supersliders from each joint on the way out. P/U=237k, S/O=132k. Calc Fill=35.5 bbl, Actual Fill 35.5 bbl. 8/24/2017 8/24/2017 0.75 FROM PLUG RURD P Clean and Gear rig floor, rig down 13,590.0 13,590.0 03:00 03:45 mud bucket. Lay down super sliders via beaver slide. Load 13-3/8" Storm packer on skate. Monitoir well for flow, static. PJSM on picking up storm packer. 8/24/2017 8/24/2017 0.50 FROM WHDBOP MPSP P P/U and M/U 13-3/8" Baker 13,590.0 13,653.0 03:45 04:15 retrievomatic to cement string (65k), RIH and set storm packer @ 13,653' tubing tail depth. Top retrieval assy @ 40' RKB, COE= 53' RKB. Left hand set, right hand 13 tum release. 8/24/2017 8/24/2017 0.25 FROM WHDBOP PRTS P P/U and space out DP, close pipe 13,653.0 13,653.0 04:15 04:30 rams and test packer to 100 psi for 5 minutes, good. 8/24/2017 8/24/2017 0.50 FROM WHDBOP RURD P FMC pull 12-3/8" ID wear ring, drain 13,653.0 13,653.0 04:30 05:00 stack. 8/24/2017 8/24/2017 1.00 PROD1 WHDBOP RURD P Rig up to test ROPE, Set 5" test joint 13,653.0 13,653.0 05:00 06:00 and test plug. Fill stack, choke and kill lines and choke manifold with water. Purge air from system. 8/24/2017 8/24/2017 4.00 FROM WHDBOP BOPE P Test BOPE with 3%a" and 5" TJ to 13,653.0 13,653.0 06:00 10:00 250/3500 psi 10 min ea. AOGCC Jeff Jones waived, BLM Mutasim Elganzoory waived witness 8/18/17 16:54 via email. Tested annular, upper and lower 334' x 6" VBR's, Auto and manual IBOP, NC50 FOSV, NC50 Dart valve, HCR choke and kill, 4" Demoo kill, manual choke and kill on stack, CV#1, Choke Valves #1414, needle valve above CV#1, all to 250/3500 psi for 10 minutes. 8/2412017 8!24/2017 0.25 FROM WHDBOP BOPE P Perform accumulator function test. 13,653.0 13,653.0 10:00 10:15 Initial system pressure=3000 psi, Pressure after function of all rams, annular and HCR's=1450 psi. 200 psi attained= 30 sec with electric pump, Full system recovery=153 seconds with electric and air pumps. 4 bottle N2 average=2100 psi. Page 22146 ReportPrinted: 10/16/2017 operations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Depth start Time End Time our (hr) Phase Op Code Activity Corte Time P -T -X Operation (ttKB) End Depth (xxB) 8/24/2017 8/24/2017 1.75 PROM WHDBOP BOPE P Test with 31/2" lest joint annular 13,653.0 13,653.0 10:15 12:00 preventer, 3'IV" x 6" Upper and lower VBR's to 250/3500 psi 10 min ea. SIMOPS- Test rig gas alarms, flow meters and PVT level alarms. 8/24/2017 8/24/2017 1.00 PROM WHDBOP BOPE P Pull test joint, test blind rams to 13,653.0 13,653.0 12:00 13:00 250/3500 psi for 10 min ea. Test manual and super auto chokes to 1100 psi. 8/24/2017 8/24/2017 0.50 PROM WHDBOP RURD P Blow down and rig down testing 13,653.0 13,653.0 13:00 13:30 equipment. FMC pull test plug and set long 12-3/8" ID wear bushing. 8/24/2017 8/24/2017 1.00 PROM WHDBOP MPSP P PJSM, M/U storm packer retrieval tool, 13,653.0 13,590.0 13:30 14:30 engage 13-3/8" Baker retrievomatic, open equalization valve and OWFF- static. POOH and L/D packer. P/U=235k. 8/24/2017 8/24/2017 2.50 PROM PLUG CIRC P Establish circulation @ 3 bpm, 600 13,590.0 13,590.0 14:30 17:00 psi. Stage pump rates up to 8 bpm, 850 psi, @ 750 bbl pumped increase to 10 bpm, 1240 psi. Reciprocate from 13,590' MD to 13,496' MD. P/U=225k, S/0=120k. Steady 11.3 ppg inlout. 8/24/2017 8/24/2017 1.50 PROM PLUG SLPC P PJSM, Cut and slip 98' of drilling line. 13,590.0 13,590.0 17:00 18:30 8/24/2017 8/24/2017 0.50 PROM PLUG SVRG P Service and inspect top drive, blocks, 13,590.0 13,590.0 18:30 19:00 hook, calibrate block height. 8/24/2017 8/24/2017 1.50 PROD1 PLUG SVRG P PJSM, Change out NC50 top drive 13,590.0 13,590.0 19:00 20:30 saver sub. SIMOPS-Service and inspect crown. 8/2412017 8/25/2017 3.50 PROD? PLUG TRIP P Trip in hole from 13,590' MD to 13,590.0 17,380.0 20:30 00:00 17,380' MD to locate TOC, fill pipe every 20 stands. S/0=1 20k. 8125/2017 8/25/2017 0.75 PROD1 PLUG TRIP P Trip in hole from 17,380' MD to 17,380.0 18,110.0 00:00 00:45 18,110' MD with cement stinger. P/U=280k, S/0=125k. 8/25/2017 8/25/2017 0.75 PROM PLUG WASH P Wash down with 2 bpm from 18,110' 18,110.0 18,236.0 00:45 01:30 MD to 18,236' MD to tag TOC plug #1. Tag firm cement @ 18,236'2x with 10k, lxwith 15k. PIU=290k, S/0=120 - 115k. 8/25/2017 8/25/2017 8.50 PROM PLUG PULD P POOH from 18,236' MD to 16,510' MD 18,236.0 16,510.0 01:30 10:00 on trip tank, removing supersliders and laying down overtorqued pipe to pipe shed. Connections breaking between 42k -78k with HT100 tongs. Lay down stands # 166-183. 8/25/2017 8/25/2017 0.50 PROM PLUG PULD P Lay down stand #184 from derrick. 16,510.0 16,510.0 10:00 10:30 8/25/2017 8/25/2017 1.00 PRODI PLUG CIRC P Establish circulation, stage pump rate 16,510.0 16,510.0 10:30 11:30 to 8 bpm, 1060 psi. Reciprocate from 16,510' MD to 16,460' MD. P/U=275k, S10=125k, Total 300 bbl pumped. 8/25/2017 8125/2017 0.50 PROM PLUG CIRC P Pump 60 bbl high Vis 38 ppb Gel pill, 16,510.0 16,510.0 11:30 12:00 11.3 ppg. 8125/2017 8/25/2017 0.50 PROW PLUG CIRC P Chase 11.3 ppg Gel pill with 212 bbl to 16,510.0 16,510.0 12:00 12:30 1 cement stinger mule shoe, 11.3 ppg LSND @ 8 bpm, 1330 psi. Page 23145 ReportPrinted: 10116/2017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log $tart Time EM Time Our (hr) Phase Op Code AMvity Code Time P -T -X O ration pe ft De Suis Depth End Depth (ftKB) 8/25/2017 8/25/2017 0.50 PROD1 PLUG PMPO P Pump out of hole from 16,510' MD to 16,510.0 16,006.0 12:30 13:00 16,006' MD laying in Gel pill base @ 9 bbl per stand, pulling 1800 fph, pumping 3 bpm. P/U=275k, S/0=125k. 8/25/2017 8/25/2017 2.50 PROD1 PLUG CIRC P Circulate and condition mud for 16,006.0 16,006.0 13:00 15:30 cementing, stage rate up to 10 bpm, 1350 psi. Reciprocate from 16,006' MD to 15,940' MD. P/U=275k, S/0=120k. 8125/2017 8125/2017 0.50 PROD1 PLUG RURD P PJSM on pumping cement plug #2, 16,006.0 16,006.0 15:30 16:00 R/U head pin and cement equipment. 8125/2017 8/25/2017 1.00 PRODt PLUG CMNT P SLB flood lines with water, test lines to 16,006.0 16,006.0 16:00 17:00 3500 psi -good. Mix and pump 24.2 bbl 12.5 ppg MudPush II @ 4.3 bpm 850 psi. follow with 48.3 bbl 15.8 ppg class G cement @ 4 bpm, 1100 psi. Chase with 5.5 bbl 12.5 ppg MudPush II behind @ 4 bpm 1000 psi and 2 bbl water. 8/25/2017 8/25/2017 0.50 PROD1 PLUG CMNT P Rig displace cement with 11.3 ppg 16,006.0 16,006.0 17:00 17:30 LSND @ 8 bpm, 1100 psi, park string @ 16,006'@ 230 bible away reduce to 3 bpm, displace with total 243 bbl. CIP17:22 hrs. 8/2512017 8/25/2017 1.50 PROD1 PLUG TRIP P POOH on elevators from 16,006' MD 16,006.0 15,000.0 17:30 19:00 @ 1000' fph to 15,000' MD. P/U=255k. 6/25/2017 8125/2017 2.50 PRODt PLUG CIRC P Insert wiper ball, chase with 30 bbl 15,000.0 15,000.0 19:00 21:30 water. Circulate around @ 10 bpm, 1440. P/U=255k, S/0=122k. SIMOPS- Break and inspect DP connections stands #149-163 for cement rings with tugger / mousehole. Finding small bits of cement in connections. 8125/2017 8125/2017 1.00 PROD1 PLUG TRIP P POOH from 15,000' MD to 14,625' MD 15,000.0 14,625.0 21:30 22:30 breaking and inspecting connections for cement rings. Finding small bits of cement in connections. 8/25/2017 8/25/2017 0.50 PROD1 PLUG CIRC P Load pipe with 40 bbl 38 ppb 11.3 ppg 14,625.0 14,625.0 22:30 23:00 Gel Pill, chase to 3%d' mule shoe with 180 bbl 11.3 ppg LSND @ 8 bpm, 1150 psi. 8/25/2017 8126/2017 1.00 PROD1 PLUG PMPO P Pump out of hole from 14,625' MD to 14,625.0 14,155.0 23:00 00:00 14,155' MD @ 2 bpm 550 psi, pulling 1000 fph. P/U=275k-300k. Slow pulling speed due observing overpull every 31' as cement stinger pulls into liner shoe. 8126/2017 8126/2017 2.75 PROD1 PLUG CIRC P Circulate and condition for Kickoff plug 14,155.0 14,155.0 00:00 02:45 @ 8-10 bpm, 880-1110 psi while reciprocating pipe. P/U=260k, S10=1 15k. SIMOPS- Check 5 stands for cement rings via mousehole. Observing small amounts of cement in connections, no full rings. 8/26/2017 8/26/2017 0.25 PROD1 PLUG RURD P Blow down top drive, R/U cement 14,155.0 14,155.0 02:45 03:00 lines. Page 24/45 Report Printed: 1 0 /1 612 01 7 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stae Time End Time Dur (hr) Phase Op Code Activity Cade Time P -T -X Operation Stan Depth flKB) End Depth (IIKB) 8126/2017 8/26/2017 0.50 PROD1 PLUG SEQP P PJSM with SLB cemnters, DDI, MI 14,155.0 14,155.0 03:00 03:30 and CPAI on cementing kickoff plug. SLB flood lines and test surface equipment to 3500 psi- good. 8/26/2017 8126/2017 1.00 PROD1 PLUG SFTY X Shut down operations due personal 14,155.0 14,155.0 03:30 04:30 medical emergency evacuation from dg pits, IP found unresponsive. Man down response in rig pits by all hands. Called and dispatched emergency services from AOC. Tested atmosphere in pits to confirm conditions, Support IP while wafting on medical team, evaluate and evacuate IP from pits. Team arrived on rig in 45 minutes. Ongoing evaluation determined cause of personnel illness. (Break string over periodically while S/D) 8/26/2017 8/26/2017 0.25 PROD1 PLUG SFTY X AAR with dg team after man down and 14,155.0 14,155.0 04:30 04:45 evac. Regroup and Re-PJSM for cement job, reassign tasks. 8/26/2017 8/26/2017 1.00 PRODt PLUG CMNT P SLB pumped 30.3 bbl 13.5 ppg 14,155.0 14,155.0 04:45 05:45 MudPush II with red dye, shut down to batch up CMT. Break pipe and insert wiper ball. SLB pumped 54 bbl 17.0 ppg kickoff cement, followed by 8.8 bbl 13.5 ppg MudPush Il, 2 bbl water to chase to pipe. Rig displaced with 211 bbl 11.3 ppg LSND @ 8 bpm, 870 psi, slow to 3 bpm for last 10 bbl. 8126/2017 8/26/2017 1.25 PROD1 PLUG TRIP P Rig down cement lines, POOH on 14,155.0 13,402.0 05:45 07:00 elevators from 14,155' MD- 13,402' MD @ 1000 fph, P/U=275k. 8/26/2017 8/26/2017 4.00 PROD1 PLUG CIRC P OWFF- Static, insert wiper ball, P/U 13,402.0 13,418.0 07:00 11:00 15' pup jt and set on depth @ 13,418' MD. Pump 30 bbl water/ citric acid spacer to clean cement from pipe, pump ball out string and repeat 30 bbl water/citric x 3 total. Circulate @ 8 bpm, 910-1100 psi. SIMOPS- Check 8 stands for cement rings, remove super sliders via mousehole. 8/26/2017 8126/2017 1.00 PROD1 PLUG RGRP T Repair top drive shot pin on pipe 13,418.0 13,418.0 11:00 12:00 handler due leaking. 8/26/2017 8/26/2017 3.50 PROD1 PLUG RGRP T Repair and install top drive shot pin 13,418.0 13,418.0 12:00 15:30 assembly. SIMOPS-#2 mud pump fluid end service, electrical inspection on Baylor brake. UD SLB lift subs from rig floor. 8/26/2017 8/26/2017 2.50 PROD1 PLUG WASH P UD 15' pup, wash in hole @ 1 bpm, 13,418.0 13,726.0 15:30 18:00 330 psi looking for TOC, 30' at a time. Wash back @ 8 bpm 1100 psi observing 30-40 psi differential washing down, 5-1 Ok WOB from 13,402' MD to 13,726' MD. P/U=275k, S/0=110k. 8/26/2017 8/2612017 2.00 PROD1 PLUG CIRC P CBU @ 9 bpm, 1260 psi looking for 13,726.0 13,726.0 18:00 20:00 cement of MudPush in returns. Observe increase in ph to 12.2, mud weight to 11.2+ ppg. Page 25146 Report Printed: 10/16/2017 operations Summary (with Tirri vepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Actively Code Time P -T -X Operation (MB) End DepM(flKB) 8/26/2017 8/26/2017 0.50 PROD1 PLUG WASH P Continue washing down @ 1 bpm, 13,726.0 13,762.0 20:00 20:30 330 psi. Tag up on TOC @ 13,762' MD. P/U and break over, set down 15k 2X @ 13,762' MD, increase flow to 3 bpm and re -tag with 15k, firm TOC @ 13,762' MD. 8/26/2017 8/2612017 0.50 PROD1 PLUG TRIP P Monitor well static for 10 min. POOH 13,762.0 13,402.0 20:30 21:00 from 13,762' MD to 13,402' MD on elevators. P/U=275k. 8/26/2017 8/27/2017 3.00 PROD1 PLUG TRIP P Pump 30 bbl 13.5 ppg dry job. 13,402.0 11,247.0 21:00 00:00 Continue POOH on trip tank to 11,247' MD breaking all connections cleaning out cement rings. Removing supersliders from stands #1324126. 8127/2017 8/27/2017 5.25 PROD1 PLUG TRIP P POOH on elevators from 11,247' MD 11,247.0 8,605.0 00:00 05:15 to 8,605' MD breaking connections cleaning out cement rings. P/U=185k. 8/27/2017 8/27/2017 0.25 PROD1 PLUG CIRC P OWFF- Static, pump 26 bbl 12.5 ppg 8,605.0 8,605.0 05:15 05:30 dry job. Blow down top drive. 8/27/2017 8/27/2017 2.75 PROD1 PLUG TRIP P POOH on elevators from 8,605'to 8,605.0 5,858.0 05:30 G8:15 5,858' MD breaking connections and cleaning out cement rings. P/U=140k. 8/27/2017 8/27/2017 0.50 PROD1 PLUG PULD P Lay down string magnet and 5,858.0 5,858.0 08:15 08:45 crossovers, no significant metal on magnet. 8/27/2017 8/27/2017 2.25 PRODt PLUG TRIP P POOH on elevators from 5,858' MD to 5,858.0 1,999.0 08:45 11:00 1,999' MD, cement residue gone. Inspecting each stand. P/U=90k. 8/27/2017 8/27/2017 0.25 PROD1 PLUG OWFF P Monitor well for flow @ liner top, static. 1,999.0 1,987.0 11:00 11:15 8/27/2017 8/27/2017 0.75 PROD1 PLUG TRIP P POOH on elevators from 1,987' MD to 1,987.0 1,054.0 11:15 12:00 1,054' MD. P/U=65k. (Swap out joint on top of stand #8) 8/27/2017 8/27/2017 0.50 PROD1 PLUG TRIP P POOH from 1,054' MD to 963' MD, 1,054.0 963.0 12:00 12:30 monitor well- static. P/U=70k. 8/27/2017 8/27/2017 0.50 PROD1 PLUG RURD P Rig up 3-1/2" tubing tongs and 963.0 963.0 12:30 13:00 equipment. 8/27/2017 8/27/2017 2.00 PROW PLUG PULD P POOH, laying down 3-1/2" EUE 963.0 0.0 13:00 15:00 1 1 cement stinger and XO's. 8/27/2017 8/2712017 0.50 PROD1 PLUG RURD P Rig down tongs and equipment, clean 0.0 0.0 15:00 15:30 and clear rig floor. PIU BHA #5 tools to dg floor. 8/27/2017 8127/2017 0.50 PRODt PLUG VvWWH P M/U stack washer and flush stack with 0.0 0.0 15:30 16:00 water, inspect for debris, clean. 8/2712017 8127/2017 3.00 PRODt PLUG BHAH P PJSM, M/U SLB Powerdrive X6 8-1/2" 0.0 632.0 16:00 19:00 x 9-7/8" UR BHA #5 to 632' MD. 8/27/2017 8/27/2017 1.00 PROD1 PLUG TRIP P Trip in hole on elevators from 632' MD 632.0 2,513.0 19:00 20:00 to 2,513' MD. P/U=90k, S/0=90k. 8127/2017 8/27/2017 0.50 PRODi PLUG DHEQ P Shallow pulse test MWD @ 500 gpm, 2,513.0 2,513.0 20:00 20:30 1340 psi, 20 rpm 3k Tq. Good. 8/27/2017 8/28/2017 3.50 PROD1 PLUG TRIP P Continue tripping in hole from 2,513' 2,513.0 8,170.0 20:30 00:00 MD to 8,170' MD filling pipe every 20 stands, P/U=195k, S10=95k. 8/28/2017 8/2812017 4.00 PROD1 PLUG TRIP P Trip in hole from 8,170' MD to 13,434' 8,170.0 13,434.0 00:00 04:00 MD filling pipe every 20 stands. P/U=280k, S/0=109k. Page 26145 Report Printed: iGN&2017 operations Summary (with Timi uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Time End Time otu(hr) Phase Op cwe Activity Code Time Pi Operation (rt KB) EW Depth (flKa) 8/28/2017 8/28/2017 1.00 PROD1 PLUG SLPC P PJSM, Slip and cut 48' drilling line. 13,434.0 13,434.0 04:00 05:00 8/28/2017 8/2812017 0.50 PRODt PLUG SVRG P Service top drive, blocks. Calibrate 13,434.0 13,434.0 05:00 05:30 block height. 8/28/2017 8128/2017 2.25 PRODt PLUG REAM P Washlream down to TOC @ 13,762' 13,434.0 13,762.0 05:30 07:45 MD @ 500 gpm, 2120 psi 8128/2017 8/28/2017 1.75 INTRM2 DRILL DRLG P Drill cement from 13,762' MD to 13,762.0 13,838.0 07:45 09:30 13,838' MD @ 500 gpm, 1590 psi, 50 rpm, 27k Tq. Begin displacement to new 9.6 ppg LSND on the fly. 8/28/2017 8/28/2017 0.25 INTRM2 DRILL DDRL P Drill ahead from 13,838' MD to 13,849' 13,838.0 13,849.0 09:30 09:45 MD, 6,071' TVD. ADT=.27 hrs, 8/28/2017 8/28/2017 1.75 INTRM2 DRILL DISP P Pick up off bottom to complete 13,849.0 13,849.0 09:45 11:30 displacement to 9.6 ppg LSND @ 500 gpm, 1730 psi, 30 rpm, 11.5k Tq. Obtain SPR's. 8/28/2017 8128/2017 0.50 INTRM2 DRILL DDRL P Continue directional drill ahead from 13,849.0 13,872.0 11:30 12:00 13,849' MD to 13,872' MD, 6,079' TVD attempting to kick off of pilot hole. ADT=.48 hrs. 8128/2017 8/29/2017 12.00 INTRM2 DRILL DDRL P Continue directional drill ahead kicking 13,872.0 14,026.0 12:00 00:00 off from 13,872' MD to 14,026' MD, 6,127' TVD. ADT=8.19 hrs, Bft=8.46 hrs, Jars= 8.46 hrs. P/U=255k, 81O=135k, ROT=175k, Tq on/off=25k/24k, ECD=10.93 ppg EMW. Trough from 14,001' MD to 14,020' MD and time drill Viper 5min for 1 hr, slipped off. Repeat trough from 14,001' MD to 14,025', commence time drilling 1' per 5 min to achieve sufficient separation. 8/29/2017 8/29/2017 13.00 INTRM2 DRILL DDRL P Drilled f/ 14,026'to 14,250' MD, 6,190' 14,026.0 14,250.0 00:00 13:00 TVD w/ 625 gpm, 2350 psi, 150 rpm, 8k WOB, 10.85 ppg ECD, P/U= 235, S/0= 125, ROT= 177, 26.5118k TQ on/off. 8/29/2017 8129/2017 1.50 INTRM2 DRILL CIRC P Pumped down under reamer 14,250.0 14,250.0 13:00 14:30 activation ball and opened UR w/ 250 gpm, 730 psi, 50 rpm. observed 30 psi pressure loss once seated. Increased rate to 660 gpm, 2230 psi and observed turbine RPM drop. S/O and observed TO increase while reaming back to 14,250' MD. Pull tested and observed 10k overpull. 8/29/2017 8129/2017 1.00 INTRM2 DRILL DDRL P Drilled f/ 14,250'to 14,261' MD. 14,250.0 14,261.0 14:30 15:30 Screens blinded of and attempted to adjust rates to compensate. 8/29/2017 8/2912017 2.00 INTRM2 DRILL CIRC T Circulated and conditioned cml. 14,261.0 14,261.0 15:30 17:30 contaminated mud w/ 550 gpm, 1680 psi, and 100 rpm while reciprocating pipe until shakers were cleared. Page 27145 Report Printed: 1011612017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth start Tan@ End Time Dur (hr) Phase Op Code Activity Cade Time P -T -X Operation (ttKB) End Depth (ftKB) 8/2912017 6130/2017 6.50 INTRM2 DRILL DDRL P Drilled f/ 14,261'to 14, 939' MD, 14,261.0 14,939.0 17:30 00:00 6,445' TVD w/ 700 gpm, 2560 psi, 20k WOB, 150 rpm, 20.5k TO, 11.21 ppg ECD, P/U= 225, 810= 125, ROT= 175. After making a connection at 14,467' MD the string stalled out at 29k TO and could not established rotation. Reamed back and worked out tight spot at 14,458' MD. 8/30/2017 813012017 20.50 INTRM2 DRILL DDRL P Drilled f/ 14,939'to 17,107' MD, 6,854' 14,939.0 17,107.0 00:00 20:30 TVD w/ 760 gpm, 3110 psi, 19k WOB, 150 rpm, 11.2 ppg ECD, PIU= 255, 810= 120, ROT= 185, 24k TO. 8/30/2017 8/30/2017 1.50 INTRM2 DRILL CIRC P Circulated BU w/ 760 gpm, 3180 psi, 17,107.0 17,107.0 20:30 22:00 150 rpm, 22k TQ. 8/30/2017 8/30/2017 0.75 INTRM2 DRILL MPDA P Pulled trip nipple and installed RCD 17,107.0 17,107.0 22:00 22:45 bearing. Broke circulation and broke in bearing w/ 50 and 100 rpm for 2 min each. 8/30/2017 8/31/2017 1.25 INTRM2 DRILL DDRL P Drilled fl 17,107'to 17,195'MD, 7090' 17,107.0 17,195.0 22:45 00:00 TVD w/ 760 gpm, 3300 psi, 20k WOB, 150 rpm, 28k TO, PIU= 255, S/O= 125, ROT= 175. 8/31/2017 8/31/2017 12.00 INTRM2 DRILL DDRL P Drilled f/ 17,195'to 17,994' MD, 7,298' 17,195.0 17,994.0 00:00 12:00 TVD w/ 730 gpm, 3620 psi, 8k WOB, 12.06 ppg ECD, 150 rpm, P/U= 260, SIO= 130, ROT= 180,25.5k TQ. 8/3112017 8/31/2017 10.00 INTRM2 DRILL DDRL P Drilled f/ 17,994'to 18,710' MD, 7,408' 17,994.0 18,710.0 12:00 22:00 TVD w/ 730 gpm, 3780 psi, 20k WOB, PIU= 265, 810= 121, ROT= 181, 26k TO, 11.92 ppg ECD. 8131/2017 8/3112017 0.50 INTRM2 DRILL SVRG P Serviced rig. 18,710.0 18,710.0 22:00 22:30 813112017 9/112017 1.50 INTRM2 DRILL DDRL P Drilled f/ 18,710' to 18,815' MD, 7,418' 18,710.0 18,815.0 22:30 00:00 TVD w/ 730 gpm, 3760 psi, 20k WOB, 120 rpm, P/U= 265, S/0= 125, ROT= 180,25k TO, 11.97 ppg ECD. 9/1/2017 9/112017 9.00 INTRM2 DRILL DDRL P Drilled f/ 18,815'to TD @ 19,341' MD, 18,815.0 19,341.0 00:00 09:00 7,443' TVD, w/ 730 gpm, 3780 psi, 23k WOB, 120 rpm, 11.79 ppg ECD, P/U= 285, S/0= 112, ROT= 182. Obtained final survey on stand #199. 9/1/2017 9/112017 1.25 INTRM2 CASING CIRC P Obtained initial parameters and 19,341.0 19,341.0 09:00 10:15 dropped under reamer closing ball. pumped down w/ 250 gpm, 1070 psi. Observed ball shear w/ 2300 psi. Noted 220 psi increase on pump pressure and 500 rpm increase on turbine. "Under Reamer Closed" 9/112017 9/2/2017 13.75 INTRM2 CASING CIRC P Circulated BU and started weighting 19,341.0 19,341.0 10:15 00:00 MW up f/ 10.1 ppg to 11.1 ppg w/ 650- 410 gpm, 3350-1660 psi, 120-50 rpm, 19-15k TO. Reciprocated pipe 30' off bottom. 9/212017 91212017 3.75 INTRM2 CASING CIRC P Continue to weight up to 11.3 ppg MW 19,341.0 19,341.0 00:00 03:45 1 I I col 375 gpm, 1560 psi, 50 rpm, i Sk TO. Page 28/45 ReportPrinted: 1011612017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Depth start Time End Time Our (hr) Phase Op Code Acbvlty Code Time P -T -X Operation (US) End Depth (Pool) 9/2/2017 9/2/2017 0.75 INTRM2 CASING OWFF P Took SPRs and observed well for 19,341.0 19,341.0 03:45 04:30 flow, Well Static. 9/2/2017 9/2/2017 7.25 INTRM2 CASING SMPD P SOOH f/ 19,314'to 14,052' MD 19,341.0 14,310.0 04:30 11:45 holding BP as per plan 100/280 psi in/out of slips. Encountered overpull and worked back down to 14,310' MD. 9/2/2017 9/2/2017 2.00 INTRM2 CASING CIRC T Broke circulation and circulated BU. 14,310.0 14,310.0 11:45 13:45 Staged pumps up to 495 gpm, 1850 psi, 50 rpm, 11k TQ, 12.2 ppg ECD. 9/2/2017 92/2017 0.50 INTRM2 CASING SMPD T SOOH f/ 14,310'to 14,044' MD. 14,310.0 14,044.0 13:45 14:15 9/2/2017 9/22017 1.75 INTRM2 CASING BKRM P BROOH f/ 14,044'to 13,809' MD w/ 14,044.0 13,809.0 14:15 16:00 450 gpm, 1670 psi, 80 rpm, 10k TQ, and worked through light spot at 14,027' MD. 922017 9/22017 1.50 INTRM2 CASING CIRC P Circulated BU staging up to 500 gpm, 13,809.0 13,809.0 16:00 17:30 2020 psi, 80 rpm, 9k TQ, 12.2 ppg ECD. 9/2/2017 9/2/2017 0.50 INTRM2 CASING OWFF P OWFF, Well static. dropped 2.75" 13,809.0 13,809.0 17:30 18:00 hollow drift. 9/22017 9/3/2017 6.00 INTRM2 CASING SMPD P SOOH f/ 13.809' to 5,412' MD. 13,809.0 5,412.0 18:00 00:00 9/3/2017 9/3/2017 2.25 INTRM2 CASING SMPD P SOOH f/ 5,412'to 2,042' MD holding 5,412.0 2,042.0 00:00 02:15 back pressure of 100/170 psi in/out of slips. 9/3/2017 9/3/2017 0.25 INTRM2 CASING OWFF P OWFF, Well static. 2,042.0 2,042.0 02:15 02:30 9/3/2017 9/3/2017 0.50 INTRM2 CASING CIRC P Circulated BU at the 9 5/8" liner top w/ 2,042.0 2,042.0 02:30 03:00 615 gpm, 1490 psi. 9/3/2017 9/32017 0.50 INTRM2 CASING SMPD P SOOH f/ 2,042' to 818' MD. 2,042.0 818.0 03:00 03:30 9/3/2017 9/3/2017 0.75 INTRM2 CASING OWFF P OWFF, well static. SimOps, B/D TD 818.0 818.0 03:30 04:15 and ready to pull bearing. 9/32017 9/32017 0.25 INTRM2 CASING MPDA P Pulled RCD bearing and installed trip 818.0 818.0 04:15 04:30 nipple. 9/32017 9/3/2017 0.50 INTRM2 CASING TRIP P POOH f/818'to 632' MD. 618.0 632.0 04:30 05:00 9/32017 9/3/2017 1.00 INTRM2 CASING BHAH P UD jars and rack back HWDP. 632.0 174.0 05:00 06:00 9/3/2017 9/3/2017 1.50 INTRM2 CASING SHAH P UD 8 1/2" X 9 7/8" BHA as per SLB. 174.0 0.0 06:00 07:30 9/3/2017 9/32017 1.50 INTRM2 CASING WWWH P Cleared rig floor and WU stack 0.0 0.0 07:30 09:00 washer. Flushed stack clean. WU wear ring retrieval tool and retrieved same. 9/32017 9/3/2017 1.00 INTRM2 CASING BOPE P Changed out top rams to 4 1/5" x 7" 0.0 0.0 09:00 10:00 VBRs 9/3/2017 9/3/2017 0.50 INTRM2 CASING MPDA P Changed out seals in the RCD clamp. 0.0 0.0 10:00 10:30 9/3/2017 9/3/2017 3.25 INTRM2 CASING BOPE P Installed test plug and rigged up 0.0 0.0 10:30 13:45 testing equipment. Tested upper VBR rams and annular w/ 5" and 7" test joints to 250/3500 psi on the rams and 250/2500 psi on the back, for 10 min each. Pulled test plug and installed 12.375" wear ring. 9/3/2017 9/32017 0.50 INTRM2 CASING RURD P P/U casing tongs and R/U to run 7" 0.0 0.0 13:45 14:15 1 I I I liner. Page 29/45 ReportPrinted: 10/1612017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Stan Time End Time our (hr) Phase Op Cade Activity Code Time P -T -X Operation (flKB) End Depth ht<B) 9/3/2017 9/312017 0.75 INTRM2 CASING PUTS P M/U shoe track and checked floats. 0.0 120.0 14:15 15:00 9/3/2017 913/2017 7.25 INTRM2 CASING PUTS P P/U and M/U 7" liner f/120'to 5,616' 120.0 5,616.0 15:00 22:15 MD as per tally. 9/3/2017 9/3/2017 0.75 INTRM2 CASING OTHR P P/U and M/U liner hanger assy to 5,616.0 5,659.0 22:15 23:00 5,659' MD. Filled void with Pal mix. S/O= 120 9/3/2017 9/412017 1.00 INTRM2 CASING RUNL P Rlh w/ 7" liner on 5" DP f/ 5,659'to 5,659.0 6,108.0 23:00 00:00 6,108' MD. 9/4/2017 9/4/2017 17.75 INTRM2 CASING RUNL P RIH w/ 7" liner on 5" DP f/ 6,108' to 6,108.0 13,759.0 00:00 17:45 13,759' MD. 9/4/2017 9/4/2017 0.25 INTRM2 CASING CIRC P Filled pipe at the shoe and took 13,759.0 13,759.0 17:45 18:00 parameters. 11 k TO at both 9 and 20 rpm, ROT= 175, P/U= 215, S/O= 146. 9/4/2017 9/5/2017 6.00 INTRM2 CASING RUNL P Continued RIH f/ 13,756'to 16,466' 13,759.0 16,466.0 18:00 00:00 MD. 9/5/2017 9/512017 7.50 INTRM2 CASING RUNL P RIH w/ 7" liner f/ 16,466' to 18,192' 16,466.0 18,271.0 00:00 07:30 MD and encountered tight spot. Set down 60k and P/U to break string over at 350k. Rotated w/ 20 rpm, 201k TO and worked string down to 18,199' MD. Stopped rotary and resumed RIH to 18271. 9/5/2017 9/6/2017 16.50 INTRM2 CASING RUNL T Continuer RIH f/ 18,271 to 19,037' 18,271.0 19,037.0 07:30 00:00 MD, repeatedly working pipe when tight spots are encountered. P/U to break over point and trapping 20k TO on tight spots and working through. 9/6/2017 9/6/2017 5.25 INTRM2 CASING RUNL T Continuer RIH f/ 19,037'to 19,295' 19,037.0 19,295.0 00:00 05:15 MD rotating as needed w/ 20 rpm, 20k TQ and working pipe. 916/2017 9/6/2017 0.75 INTRM2 CASING HOSO P M/U 2 singles and the cment head. 19,295.0 19,341.0 05:15 06:00 RIH and tagged bottom at 19,341' MD. 9/6/2017 9/7/2017 18.00 INTRM2 CEMENT CIRC T Broke circulation w/.2 bpm. 480 psi, 19,341.0 19,341.0 06:00 00:00 working string w/ P/U= 385, S/O= 110, ROT= 200, 20 rpm, and 20k TO. Staged pumps up to 1.2 bpm, 1050 psi reducing the rate on the down stroke. 9/712017 9/7/2017 9.00 INTRM2 CEMENT CIRC T Continued to nurse circulation and 19,341.0 19,341.0 00:00 09:00 clean out heavy mud. Staged pumps up from 1.4 bpm, 1040 psi, 20 rpm, 22k TO to 4 bpm, 480 psi as the mud cleaned up. Highest MW seen was 13.6 ppg, MW at BU was 11.1 ppg. 917/2017 9/7/2017 0.50 INTRM2 CEMENT RURD P R/U cmt lines to and head and 19,341.0 19,333.0 09:00 09:30 establish circulation at 4 bpm, 540 psi. SimOps, held PJSM for cmt job. 9/7/2017 91712017 0.50 INTRM2 CEMENT SEQP P Flushed and lines with H2O and 19,333.0 19,333.0 09:30 10:00 pressure tested same to 4200 psi. Page 30146 Report Printed: 10/16/2017 ./perations Summary (with Timelog uepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Depm Start Time End Time Dur (hr) Phase Op Code Ac Vity Code Time P -T -x Operation (fLKB) End Depth (aK8) 9/7/2017 9/7/2017 3.25 INTRM2 CEMENT CMNT P Pumped 40 bbl of 12.5 ppg MPII 19,333.0 19,333.0 10:00 13:15 spacer at 3.7 bpm. Launched bottom dart and chased with 60.1 bbl of 15.8 ppg cmt. Launched top dart w/ 20 bbl of H2O from the cmt unit. Swapped over to rig pumps and displaced w/ 418 bbl of 11.1 ppg mud at 4 bpm. Bumped plug w/ 1000 psi. Increased to 2700 psi and SIO 70k to set Hanger Continued up to 3900 psi to set hanger packer. Bleed off and checked floats, "Floats Held". Released from hanger and sheared subs at 80k. "CIP @ 12:45" "TOL= 13,681" No losses, no pack -offs 917/2017 9/7/2017 0.75 INTRM2 CEMENT RURD P RID cmt lines and BID. 19,333.0 19,333.0 13:15 14:00 917/2017 9/7/2017 0.50 INTRM2 CEMENT PRTS P Pressure tested liner top packer to 19,333.0 19,333.0 14:00 14:30 2500 psi for 10 min, Test Held. BID kill line. 917/2017 9/712017 2.00 INTRM2 CEMENT CIRC P Held 500 psi on the DP and pulled out 19,333.0 13,681.0 14:30 16:30 of liner top to 13,681' MD. Circulated BU x2 w/ 16 bpm, 2080 psi. Until sand cleaned up. 9/7/2017 9/7/2017 0.50 INTRM2 CEMENT RURD P UD cmt head, 5" DP pup and single. 13,681.0 13,681.0 16:30 17:00 9/7/2017 9/7/2017 2.00 INTRM2 CEMENT PULD P POOH N 13,681' to 12,658' MD UD 5" 13,681.0 12,658.0 17:00 19:00 DP and 5" HWDP. P/U= 215, S/0= 140. 9/7/2017 9/7/2017 1.50 INTRM2 WHDBOP MPSP P PIU storm packer assy and M/U to 5" 12,658.0 12,782.0 19:00 20:30 DP. RIH to 12,782' MD, OWFF and hang off string. Tested Packer to 500 psi and held. Released from packer and racked back stand and running tool. 9/7/2017 9/7/2017 0.50 INTRM2 WHDBOP RURD P Pulled wear ring and set lest plug. 12,782.0 12,782.0 20:30 21:00 9/7/2017 9/7/2017 0.75 INTRM2 WHDBOP RURD P RIU testing equipment, drained stack 12,782.0 12,782.0 21:00 21:45 and filled with H2O. 9/7/2017 9/812017 2.25 INTRM2 WHDBOP BOPE P Tested BOPE w/ 5" test joint, annular, 12,782.0 12,782.0 21:45 00:00 upper rams, choke valves 1,2,4-12, 4" Demco Kill, Auto and Manual IBOP, HRC choke and kill, 5" FOSV and dart, and choke needle valve to 250/3500 psi for 5 min. Test witnessed by AOGCC rep Adam Earl. 9/8/2017 9/812017 2.75 INTRM2 WHDBOP BOPE P Continue to tested BOPE. Tested 12,782.0 12,782.0 00:00 02:45 manual choke and kill valves, valve #3, lower and upper rams w/7" test joint, and blind rams to 250/3500 psi for 5 min. Performed draw down test w/ 1200 psi on both chokes. Tested accumulator, starting pressure on Acc= 3050, Man= 1400, Ann= 800. Final pressure on Acc= 1450, Man= 1200, Ann= 750. Built to 200 psi in 36 sec, total pressure in 155 sec. N2 average= 2085 psi. Test witnessed by AOGCC rep Adam Earl. Page 31145 ReportPrinted: 10116/2017 operations Summary (with Timelog vepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Stat Time End Time our (hr) Phase Op Code Activity Cade Time P -T -X Operation (RKB) End Depth (iti(B) 9/8/2017 9/8/2017 0.75 INTRM2 WHDBOP RURD P R/D BOP test equipment, B/D lines. 12,782.0 12,782.0 02:45 03:30 Pulled test plug and installed wear ring (12.357" ID). UD test joints and swapped stack back to mud. 9/8/2017 9/8/2017 1.25 INTRM2 WHDBOP MPSP P Retrieved storm packer as per Baker. 12,782.0 12,655.0 03:30 04:45 POOH and UD packer easy and components. 9/812017 9/812017 9.50 INTRM2 CEMENT PULD P Cleared dg floor and UD 5" DP in 12,655.0 12,655.0 04:45 14:15 derrick. P/U HT 100 tongs and broke out over torqued pipe w/ 78k. UD HT 100 tongs. 9/8/2017 9/8/2017 0.75 INTRM2 CEMENT TRIP P RIH w/ remaining 5" DP in derrick fl 12,655.0 13,598.0 14:15 15:00 12,655'to 13,598' MD. 9/8/2017 9/8/2017 1.00 INTRM2 CEMENT SLPC P Slip and Cut 75' of DL. 13,598.0 13,598.0 15:00 16:00 9/8/2017 9/8/2017 0.75 INTRM2 CEMENT SVRG P Service TD and draw works. 13,598.0 13,598.0 16:00 16:45 9/8/2017 9/8/2017 2.75 INTRM2 CEMENT DISP P Displaced well above liner top 13,598.0 13,598.0 16:45 19:30 13,681' to 8.6 ppg sea water w/ 13.5-9 bpm, 1600-480 psi. 9/8/2017 9/8/2017 0.50 INTRM2 CEMENT OWFF P OWFF, Well Static. 13,598.0 13,598.0 19:30 20:00 9/8/2017 9/8/2017 2.75 INTRM2 CEMENT PULD P POOH f/ 13,598'to 11,718' MD and 13,598.0 11,718.0 20:00 22:45 UD 5" DP. 9/8/2017 9/8/2017 0.25 INTRM2 CEMENT OWFF P OWFF, Well static. Observed U- 11,718.0 11,718.0 22:45 23:00 tubing up DP. 9/8/2017 9/8/2017 0.75 INTRM2 CEMENT PULD P POOH f/ 11,718'to 11,251' MD and 11,718.0 11,251.0 23:00 23:45 UD 5" DP. 9/8/2017 9/9/2017 0.25 INTRM2 CEMENT CIRC P Pumped 28 bbl 10 ppg dry job. 11,251.0 11,251.0 23:45 00:00 9/912017 9/9/2017 9.75 INTRM2 CEMENT PULD P POOH and UD 5" DP f/ 11,251' to 11,251.0 0.0 00:00 09:45 1 surface and UD Baker running tool. 9/9/2017 9/9/2017 1.00 INTRM2 CEMENT RURD P Cleared rig floor and R/U 7" casing 0.0 0.0 09:45 10:45 running tools. Pulled wear ring as per FMC. 9/9/2017 9/9/2017 0.50 INTRM2 CEMENT RURD P M/U 7" casing hanger and landing 0.0 0.0 10:45 11:15 joint, RIH and dummy test. 9/9/2017 9/10/2017 12.75 INTRM2 CEMENT PUTB P M/U seal easy and RIH to 11,830' MD, 0.0 11,830.0 11:15 00:00 M/U 7" BTCM to 12k TO and inspecting seals. 9/10/2017 9/10/2017 2.00 INTRM2 CEMENT PUTS P Continue to RIH w/ 7" tie back f/ 11,830.0 13,865.0 00:00 02:00 11,830'to 13,865' MD. 9/10/2017 9/10/2017 0.50 INTRM2 CEMENT HOSO P R/U head pin and break circulation w/ 13,865.0 13,696.0 02:00 02:30 1.5 bpm, 20 psi, S/O and engage seals at 13,684' MD w/ 50 psi. Shut off pumps and bleed off. continued down to NoGo at 13,696' and set down 10k. 9110/2017 9/10/2017 0.50 INTRM2 CEMENT PRTS P P/U 3' and tested seals to 2500 psi 13,696.0 13,693.0 02:30 03:00 and held for 10 min. Test Good. 9/10/2017 9/10/2017 1.75 INTRM2 CEMENT HOSO P POOH 3 joints and P/U space out 13,693.0 13,681.0 03:00 04:45 pups (19.7' and 8.09). M/U A # 326 and 7" casing hanger on landing joint. Wash down and engage seals w/ 1.5 bpm. P/U SID 13,681' MD and closed annular for reverse circulating. Page 32145 Report Printed: 10116/2017 . perations Summary (with Timelog wepths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log SWrt Depth Start Time End Time Our (hr) Phase Op Code Activity Code Time P -T -X Operation End Depth(W[3) 9/10/2017 9/10/2017 1.75 INTRM2 CEMENT CRIH P Broke circulating and pumped 238 bbl 13,681.0 13,681.0 04:45 06:30 of 8.5 ppg corrosion inhibited brine down the annulus w/ 4 bpm, 270 psi. SimOps, R/D 7" running tools, P/U 6 1/8" BHA components, and changed saver sub. 9/10/2017 9/10/2017 2.00 INTRM2 CEMENT FRZP P Swapped over to the ball mill and 13,681.0 13,681.0 06:30 08:30 pumped 207 bbl of 6.7 ppg diesel freeze protect wl 3.5 bpm, 220-500 psi. 9110/2017 9/10/2017 0.25 INTRM2 CEMENT HOSO P Stripped through annular and landed 13,681.0 13,689.3 08:30 08:45 7" casing hanger at 13,689.27' MD. (4.8' off of NoGo) 9110/2017 9/10/2017 0.50 INTRM2 CEMENT RURD P RID 1502 circulation equipment and 13,689.3 0.0 08:45 09:15 head pin. UD landing joint. 9/1012017 9/10/2017 1.75 INTRM2 CEMENT W WSP P Drained stack and M/U FMC pack off 0.0 0.0 09:15 11:00 running toll and 4: DP. RIH and set pack off as per FMC. Tested Void to 25015000 psi and witnessed. 9/1012017 9/10/2017 1.25 INTRM2 CEMENT W WSP P Pressure tested OA to 2500 psi for 30 0.0 0.0 11:00 12:15 min and charted. Test Good. 9/10/2017 9/10/2017 0.75 INTRM2 CEMENT RURD P RID lines from the ball mill. Drained 0.0 0.0 12:15 13:00 stack and flush with sea water. 9/10/2017 9/10/2017 1.75 INTRM2 CEMENT BOPE P Changed out upper rams to 3.5" x 6" 0.0 0.0 13:00 14:45 VBRs and finished changing saver sub. 9/10/2017 9110/2017 1.75 INTRM2 CEMENT BOPE P Set test plug, fill lines and attempted 0.0 0.0 14:45 16:30 to test annular. Could not maintain high pressure and decision was made to change the bag. 9/10/2017 9/10/2017 6.75 INTRM2 CEMENT BOPE T Replaced annular element. Pulled 0.0 0.0 16:30 23:15 test plug and joint and UD . R/D MPD equipment, hoses, flow line, and trip nipple. Screwed off annular cap and replaced element. Reattached cap and R/U air valve, and MPD clamp. Installed test joint and 4" test joint. Filled stack with H2O. 9/10/2017 9/11/2017 0.75 INTRM2 CEMENT BOPE P Test annular w/4"test joint to 0.0 0.0 23:15 00:00 250/3500 psi for 10 min. 9/11/2017 9/11/2017 0.75 INTRM2 CEMENT BOPE P Test upper and lower rams w/ 4" test 0.0 0.0 00:00 00:45 joint to 250/3500 psi for 10 min. 9/11/2017 9/11/2017 1.75 INTRM2 CEMENT MPDA T Tested MPD rotary head wl test cap to 0.0 0.0 00:45 02:30 1200 psi with no success. adjusted clamp multiple times and changed seal ring with no change. Pulled lest cap and found damaged. 9/11/2017 9/11/2017 1.00 INTRM2 CEMENT MPDA P P/U bearing and landed in RCD w/ 4" 0.0 0.0 02:30 03:30 DP shut in and tested MPD rotary head to 1000 psi, Test held. 9/1112017 9/11/2017 0.50 INTRM2 CEMENT MPDA P Installed trip nipple and filled lines with 0.0 0.0 03:30 04:00 H2O. 9/11/2017 9/11/2017 3.00 INTRM2 CEMENT BOPE T P/U 4.5" test joint and tested annular, 0.0 0.0 04:00 07:00 and both rams to 250/3500 psi for 10 min. Rigged down test equipment and B/D lines. 9/11/2017 9/11/2017 0.75 INTRM2 CEMENT RURD P Pulled test plug and installed 8.875" 0.0 0.0 07:00 07:45 wear ring. 9/11/2017 9/11/2017 1.00 INTRM2 CEMENT BHAH P WU 6 1/8" BHA to 155' MD as per 0.0 155.0 07:45 08:45 SLB. Page 33146 ReportPrinted: 10116/2017 %jperations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time Eno Time Our (hr) Phase Op Code Activity Code Time PJA Operation (itKa) Ek Depth (MOS) 9/11/2017 9/11/2017 2.00 INTRM2 CEMENT PULD P Singled in hole fl 156to 1,753' MD. 155.0 1,753.0 08:45 10:45 9/11/2017 9/11/2017 2.75 INTRM2 CEMENT DHEQ T Attempted to shallow test MWD tools 1,753.0 1,753.0 10:45 13:30 w/ 190-235 gpm, 700-1070 psi. No Go, unable to receive signal from tools. 9111/2017 9111/2017 1.25 INTRM2 CEMENT TRIP T TOOH fl 1,753'to 146' MD. 1,753.0 146.0 13:30 14:45 9/11/2017 9/11/2017 0.25 INTRM2 CEMENT CIRC T Broke circulation and trouble shot 146.0 146.0 14:45 15:00 tools at surface. No Go. 9/1112017 9/11/2017 0.50 INTRM2 CEMENT BHAH T Changed out Impulse tool 146.0 146.0 15:00 15:30 911112017 9/11/2017 1.00 INTRM2 CEMENT TRIP T RIH from derrick to 1,753' MD. 146.0 1,753.0 15:30 16:30 911112017 9/11/2017 0.50 INTRM2 CEMENT DHEQ P Shallow lest tools w/ 210 gpm, 1020 1,753.0 1,753.0 16:30 17:00 psi. Test Good. 9/11/2017 9/12/2017 7.00 INTRM2 CEMENT PULD P Singled in hole f/ 1,753'to 9,626' MD. 1,753.0 9,626.0 17:00 00:00 9/12/2017 9/12/2017 3.75 INTRM2 CEMENT PULD P Singled in hole with pipe from pipe 9,626.0 14,040.0 00:00 03:45 shed fl 9,626' MD to 14,040' MD. Filling drill string every 20 stands. UP wt -185K, ON wt -120K 9112/2017 9/12/2017 2.25 INTRM2 CEMENT DISP P Displace well from 8.6 ppg C-1-120 to 14,040.0 14,040.0 03:45 06:00 10.9 ppg LSND at 200 gpm at 1,390 ICP 11,950 FCP while reciprocating string 60 -ft through out the displacement with no rotation. 9112/2017 9/12/2017 0.25 INTRM2 CEMENT PULD P Singled in hole with pipe from pipe 14,040.0 14,135.0 06:00 06:15 shed fl 14,040' MD to 14,135' MD. Filling drill string 911212017 9/12/2017 0.25 INTRM2 CEMENT QEVL P Singled in hole with pipe from pipe 14,135.0 14,229.0 06:15 06:30 shed fl 14,135' MD to 14,229' MD. conducting Sonic Log to establish base line 9/12/2017 9/12/2017 2.50 INTRM2 CEMENT PULD P Singled in hole with pipe from pipe 14,229.0 17,160.0 06:30 09:00 shed f/ 14,229' MD tol7,160' MD. Filling drill string every 20 stands. 9112/2017 9/12/2017 3.75 INTRM2 CEMENT QEVL P Singled in hole with pipe from pipe 17,160.0 19,067.0 09:00 12:45 shed f/ 17,160' MD to 19,067' MD. Conducting Mad Pass w/ Sonic Tool to establish TOC Log above liner lap. 9/12/2017 9/12/2017 1.00 INTRM2 CEMENT COCF P Wash and ream fl 19,067 -ft to 19,180- 19,067.0 19,180.0 12:45 13:45 ft at 200 gpm at 2,600 - 2,860 psi at 30 rpm's w/9 -12K TO. UPwt- 204K, ON wt - 108K and ROT wt - 150K w/ 10K Free TO. 9/12/2017 9/1212017 0.25 INTRM2 CEMENT CIRC P Circulate at 200 gpm @ 2,860 psi and 19,180.0 19,162.0 13:45 14:00 Down link MWD tools. Rack back to 19,162 -ft. 9112/2017 9/12/2017 1.50 INTRM2 CEMENT PRTS P RU and pressure test 7", 26#, L-80 19,162.0 19,162.0 14:00 15:30 BTCM Production csg to 3,500 psi for 30 minutes on Chart. Good test - (7.7 bbls) RD test equipoment and blow down lines. 9/12/2017 9/12/2017 1.00 INTRM2 CEMENT SLPC P Slip and cut 45 -ft of 1-3/8" Drill line 19,162.0 19,162.0 15:30 16:30 while circulating at 3 bpm at 1,040 psi. 9/12/2017 9112/2017 0.50 INTRM2 CEMENT SVRG P Service Top Drive and Draw works 19,162.0 19,162.0 16:30 17:00 while circulating at 4 bpm at 1,500 psi. Page 34145 ReportPrinted: 10/16/2017 operations Summary (with Timelog Lrepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Sten Time Ehd Tim our (hr) Phase Op Code Activity Cone Time P -T -X Operation (ftKB) End DOW[ftK8) 9/1212017 9/12/2017 0.50 INTRM2 CEMENT COCF P Wash and Ream from 19,162' MD to 19,162.0 19,203.0 17:00 17:30 19,203' MD at 200 gpm at 1.950 psi 9/12/2017 9/12/2017 6.00 INTRM2 CEMENT DRLG P Drill out cement and shoe track and 19,203.0 19,342.0 17:30 23:30 rat hole from 19,203' MD to 19,342' MD at 150 to 205 gpm at 950 to 2,340 psi rotating at 60 - 70 rpm's with 11 to 18.5K TO (L/C @ 19,207 -ft; F/C @ 19,250 -ft; Shoe @ 19,333 -ft) 9112/2017 9/13/2017 0.50 INTRM2 CEMENT DDRL P Drill 20 -ft of new formation from 19,342.0 19,362.0 23:30 00:00 19,342' MD to 19,362'MD 9/1312017 9/13/2017 1.75 INTRM2 CEMENT CIRC P CBU at 200 gpm at 2,550 psi while 19,362.0 19,257.0 00:00 01:45 rotating at 60 rpm's w/ 17K TO while reciprocating from 19,362 -ft to 19,257 UP wt - 250K, DN wt 90K, ROT wt - 150K 9/13/2017 9/13/2017 1.00 INTRM2 CEMENT LOT P RU and perform a LOT to 13.0 ppg 19,257.0 19,257.0 01:45 02:45 EMW w/ 10.8 ppg at 852 psi at 19,362 -ft MD / 7,446.8 TVD Good Test 9/1312017 9/13/2017 1.25 PROD2 DRILL MPDA P Pull trip nipple and install RCD 19,257.0 19,257.0 02:45 04:00 assembly. Break in the RCD bearing and set parameters for flow control while circulating at 195 gpm at 2,480 psi and rotating at 50 rpm's with 16.5K TO and reciprocating from 19,257 -ft to 19,362 -ft. 9/13/2017 9/13/2017 2.50 PROD2 DRILL DDRL P DDRLG from 19362 -ft to 19,448 -ft wl 19,257.0 19,448.0 04:00 06:30 3 to 1 OK WOB, ROT at 100 rpm's with 18K TO while displacing well from 10.8 ppg LSND to 9.3 ppg Flo -Pro at 200 gpm at 3,000 ICP and 2,400 FCP. UP wt - 200, DN wt - 115K and ROT wt - 152K Obtain SPR's w/ 9.3 ppg while maintaining 10.6 ppg ECD 9/13/2017 9/13/2017 1.00 PROD2 DRILL CIRC P Continue to circulate at 220 gpm at 19,448.0 19,448.0 06:30 07:30 2,220 psi till fluid wt was 9.3 ppg in I out while reciprocating and rotating at 80 rpm's with 7K TO froml9,448-ft to19,320-ft 9/13/2017 9/13/2017 3.00 PROD2 DRILL OWFF P Fingerprint formation w/ MPD w/ 19,448.0 19,448.0 07:30 10:30 closed chokes and monitor well for pressure build - trap 525 psi - bleed to zero - build to 353 psi - bleed to 371 psi /.052/7448.8 TVD + 9.3 ppg = (10.3 ppg) EMW. CBU at 220 gpm at 2,310 psi while reciprocating and Rotating at 100 rpm's w/ 7K TO from 19,320 -ft to 19,448 -ft - Gas peaked at 1,160 units at BU. 9113/2017 9/13/2017 1.50 PROD2 DRILL DDRL P DDrill from 19,448 -ft MD 17448.8 -ft 19,448.0 19,638.0 10:30 12:00 TVD to 19,638 -ft MD / 7,447.1 -ft TVD at 160 rpm's w/ 12K WOB at 220 gpm at 2,450 psi w/ ECD = 11.25 ppg - ADT = 3.16 hrs 9/13/2017 9/14/2017 12.00 PROD2 DRILL DDRL P DDrill from 19,638 -ft MD / 7447.1 -ft 19,638.0 20,876.0 12:00 00:00 TVD to 20,876 -ft MD l 7,416 -ft TVD at 160 rpm's w/ 6-14K WOB at 210 gpm at 2,520 psi w/ ECD = 11.41 ppg - ADT = 8.24 him Page 36145 ReportPrinted: 1011612017 operations Summary (with Timelog L.epths) C D5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan DepN Start Time End Time Dur(ho Phase Op Code Activity CMe Tim P -T -X Operation (ftKB) EM Depth(ftKB) 9114/2017 9/14/2017 12.00 PROD2 DRILL DDRL P DDrlg from 20,876 -ft to 22,020 -ft MD / 20,876.0 22,020.0 00:00 12:00 7435 -ft TVD. ADT = 9.68 while holding 500 psi applied pressure w/ MPDE. PR=220 gpm, 2,620 psi, with 3-5 K WOB, maintaining 11.28 ppg ECD 9/14/2017 9/15/2017 12.00 PROD2 DRILL DDRL P DDrig from 22,020 -ft to 22,781 -ft MD / 22,020.0 22,781.0 12:00 00:00 7440 -ft TVD. ADT = 9.65 while holding 500 psi applied pressure w/ MPDE. PR=220 gpm, 2,830 psi, with 7-12 K WOB, maintaining 11.72 ppg ECD 9/15/2017 9/15/2017 1.00 PROD2 DRILL DDRL P Continue to DDrill from 22,781 -ft MD 22,781.0 22,715.0 00:00 01:00 to 22,715 -ft at 215 gpm at 2,770 psi at 120 rpm w/ 8.5K torque UP wt - 205K, DN wt - 1 OOK and 150K Rot wt. Circulate 3-3/4 OH volumes in preparation of changing out the bearing 9115/2017 9/15/2017 1.00 PROD2 DRILL MPDA P Change out the bearing while holding 22,715.0 22,715.0 01:00 02:00 500 psi well bore pressure with the annular 9/15/2017 9/15/2017 0.50 PROD2 DRILL DDRL P Continue to DDrill from 22,715 -ft to 22,715.0 22,781.0 02:00 02:30 22,781 -ft at 210 gpm at 2,630 psi form 10 to 100 rpms with 6.5 to 8K TO while breaking in the bearing 9/15/2017 9/15/2017 9.50 PROD2 DRILL DDRL P DDrill from 22,781 -ft to 23,053 -ft / 22,781.0 23,053.0 02:30 12:00 7439 -ft TVD at 210 gpm at 2,630 psi form 10 to 100 rpms with 6.5 to 8K TO while breaking in the bearing 9/15/2017 9/16/2017 12.00 PROD2 DRILL DDRL P Continue to DDrill from 23,053 -ft to 23,053.0 23,257.0 12:00 00:00 23,257 -ft /7,443 -ft TVD at 220 gpm at 2,780 psi all 20 tol65 rpm's w/2 to10K WOB w/ 11K TO with an ECD of 11.7 ppg. UP wt = 200K, DN wt = 100K and ROT wt = 15OK w/ 11 K On and 9K off TO. ADT 11.4 Bit hrs = 51.55 Jar hrs = 51.55 9/16/2017 9/16/2017 8.00 PROD2 DRILL DDRL P Continue to directionally drill from 23,257.0 23,395.0 00:00 08:00 23,257 -ft to 23,395 -ft MD / 7,446 -ft TVD at 220 gpm at 2,910 psi w/ 8K - WOB, at 120 rpm's 9/16/2017 9/16/2017 0.50 PROD2 DRILL CIRC T Take on bottom survey and obtain 23,395.0 23,395.0 08:00 08:30 SPR's 9116/2017 9/16/2017 0.25 PROD2 DRILL OWFF T Trap 400 psi - build to 428 psi and 23,395.0 23,395.0 08:30 08:45 stablize, bleed back to 295 psi - build back to 349 psi (10.2 ppg EMW) while rotating at 5 rpm w/ 7.5K TO 9/16/2017 9/1612017 1.00 PROD2 DRILL BKRM T BKRM from 23,396 -ft to 23,275 -ft at 23,395.0 23,275.0 08:45 09:45 220 gpm while rotating at 120 rpm's w/ 7.5K TO 9/16/2017 9/16/2017 3.75 PROD2 DRILL DISP T Displace the well over from 9.3 ppg 23,275.0 23,275.0 09:45 13:30 FloPro to 10.7 ppg viscosified brine - Pump 35 bbl 10.7 ppg spacer followed by 800 bbls of 10.7 ppg NaBr / NaCl brine at 205 gpm at 2,000 psi while rotating at 80 rpm's w/ 7K TO reciprocating from 23,257 -ft to 23,161 - ft. 911612017 9/1612017 0.50 PROD2 DRILL OWFF T Monitor well for flow - static for 30 23,275.0 23,275.0 13:30 1400 minutes Page 36145 Report Printed: 1 011 612 01 7 operations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Stad Time EM Time our (hr) Phase Op Code Activit' Code Time P -TA Operation (ftKB) End Depth (MB) 9/16/2017 9/16/2017 6.00 PROD2 DRILL SMPD T SOOH from 23,257 -ft to 19,257 -ft MD 23,275.0 19,257.0 14:00 20:00 at 189 gpm at 225 psi BP UP wt = 215K, ON wt = 100K 9/16/2017 9/16/2017 0.50 PROD2 DRILL OWFF T Monitor well for flow at the 7" shoe - 19,257.0 19,257.0 20:00 20:30 Static, Sim ops- Bring on more 10.7 ppg Brine to active pit volume. 9/16/2017 9/17/2017 3.50 PROD2 DRILL SMPD T Continue to SOOH from 19,257 -ft to 19,257.0 15,741.0 20:30 00:00 15,741 -ft MD at 210 gpm at 225 psi BP UP wt = 185K 9/17/2017 9/17/2017 8.50 PROD2 DRILL SMPD T Continue to SOOH from 15,471 -ft to 15,741.0 996.0 00:00 08:30 996 -ft holding 220 to 100 psi with 50 AP UP wt=82K, ON wt=82K 9/17/2017 9/17/2017 0.25 PROD2 DRILL OWFF T Monitor well for flow - Static Sim ops- 996.0 996.0 08:30 08:45 prep for Trip Nipple install 9/17/2017 9/17/2017 0.50 PROD2 DRILL MPDA T Pull MPD Bearing and Install Trip 996.0 996.0 08:45 09:15 Nipple 9/17/2017 9/17/2017 0.50 PROD2 DRILL TRIP T Trip out from 996 -ft to 155 -ft 996.0 155.0 09:15 09:45 9/17/2017 9/17/2017 1.25 PROD2 DRILL SHAH T PJSM - POOH laying down 6-1/8" 155.0 0.0 09:45 11:00 DDrlg BHA # 7 from 155 -ft to bit. Lower stab - showed some signs of wear. Clean and clear dg for BOP test 9/172017 9/17/2017 1.50 PROD2 WHDBOP RURD T Pull FMC wear ring and set test on 4" 0.0 0.0 11:00 12:30 Test p. Flood stack and choke / kill lines with 8.3 ppg H2O. Page 37145 Report Printed: 10/16/2017 operations Summary (with Timelog vepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Tme End Time Dur(ho Phase Op Code Activity Code Time P -T -X OperaWn Start Depen (ftKB) End Depth(W[3) 9/17/2017 9/17/2017 7.00 PROD2 WHDBOP BOPE T Conduct 10 -minute Charted BOP test 0.0 0.0 12:30 19:30 with 4" and 4-1/2" test joints at 250 / 3,500 psi on Annular, Rams and Choke Manifold. 24 and 72 hr Notices were given to AOGCC and BLM on 9- 16-17 and witnesses were waived by Lou Laubenstein w/ AOGCC and Jessie Chmielowski w/ BLM. Test 1 w/ 4" test joint Annular, 4" Kill Demco valve, CM valves— 1, 12,13, and 14, along w/ Upper IBOP. Test 2 w/ 4" test joint UPR 3 % x 6" VBR's, HCR Kill, CM valves — 9 and 11, Man. IBOP Test 3 w/ 4" test joint UPR 3 % x 6" VBR's, CM valves — 5,8 and 10, XT -39 Dart Valve Test 4 w/ 4" test joint UPR 3 h x 6" VBR's, CM valves — 4,6 and 7, XT -39 FOSV, Test 5 w/ 4" test joint UPR 3 1 x 6" VBR's, CM valve — 2, Test 6 w/ 4" test joint UPR 3'A x 6" VBR's, HCR Choke Test 7 w/ 4" test joint UPR 3'F. x 6" VBR's, Manual Choke and Kill Test 8 w/ 4" test joint LPR 3 % x 6" VBR's Test 9 w/ 4-1/2" test joint Annular Test 10 w/ 4-1/2" lest joint UPR3 Y.x6"VBR's Test 11 w/ 4-1/2" test joint LPR 3 % x 6" VBR's Test 12 Blinds Test 13 at 1,100 psi Manual choke Test 14 at 1,100 psi Hydraulic choke Accumulator Draw down Test Sys. PSI = 3,050 Manifold PSI = 1,500 Annular PSI = 800 (After Func. PSI) Sys., PSI = 1,450 Manifold PSI = 1,200 Annular PSI = 800 200 PSI increase = 34 seconds 9/17/2017 9/17/2017 1.00 PROD2 WHDBOP RURD T Blow down and rig down testing 0.0 0.0 19:30 20:30 equipment, Pull Test Plug and set FMC wear ring 8.813" ID x ??? 9/17/2017 9/17/2017 1.50 PROD2 DRILL BHAH T PJSM, PU, MU and RIH w/ DDdg BHA 0.0 311.9 20:30 22:00 #8 to 311.90 -ft 9/17/2017 9/17/2017 0.50 PROD2 DRILL PULD T Drill Pipe management- PU and RIH 311.9 780.0 22:00 22:30 w/ BHA #8 while PU and RIH w/ 15 joints of 4", 14# S-135 Drill pipe Page 38/45 ReportPrinted: 1 0/1 612 01 7 .operations Summary (with Timelog "pths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Time End Time our hr ( ) Phase OpCode ActivM1y Cotle Tim P -T -X Operation sin �P� (flKB) End DepM (flKa) 9/17/2017 9/17/2017 1.00 PROD2 DRILL TRIP T Connit us to RIH w/ BHA #8 (6-1/8" 780.0 2,198.0 22:30 23:30 Production Hole DDrlg Assy) from 780 A to 2,198-11 MD UP wt = 85K, DN wt = 85K 9/17/2017 9/18/2017 0.50 PROD2 DRILL DHEQ T Shallow test MWD tools at 200 gpm at 2,198.0 2,198.0 23:30 00:00 900 psi 9/18/2017 9/18/2017 0.75 PROD2 DRILL DHEQ T Continue to Shallow Pulse test MWD 2,198.0 2,198.0 00:00 00:45 w/ 200 to 205 gpm at 900 to 1,040 PSI while rotating at 50 rpm's w/ 5.1 K TO - Good Test 9/18/2017 9/18/2017 8.25 PROD2 DRILL TRIP T Continue to Trip in the hole from 2,198 2,198.0 19,226.0 00:45 09:00 -ft to 19,226 -fl filling the DP every 20 stands UP wt = 197K, DN wt = 127K 9/18/2017 9/18/2017 0.25 PROD2 DRILL OTHR T Obtain Slow Pump Rates with Pump # 19,226.0 19,226.0 09:00 09:15 2 at 15 SPM at 300 PSI, 25 SPM at 610 PSI at 19,226 -ft at 09:12 hrs 9/18/2017 9/182017 1.00 PROD2 DRILL SLPC T PJSM, Cut and Slip 53 -ft of 1-3/8" Drill 19,226.0 19,226.0 09:15 10:15 line 9/182017 9/18/2017 0.75 PROD2 DRILL SVRG T Service and Inspect Top drive, Draw 19,226.0 19,226.0 10:15 11:00 works and Iron Roughneck and adjust brakes. Calibrate Block Height and re -test Com. (Good) 9/18/2017 9/18/2017 0.50 PROD2 DRILL MPDA T PJSM, Pull trip nipple and Install RCD 19,226.0 19,226.0 11:00 11:30 Bearing Fill lines and inspect for leaks. 9/18/2017 9/18/2017 3.50 PROD2 DRILL SMPD T Continue to SIH w/o maintaining any 19,226.0 23,395.0 11:30 15:00 pressure. 9/182017 9/18/2017 0.50 PROD2 DRILL CIRC T Break Circulation at 200 gpm at 2,120 23,395.0 23,395.0 15:00 15:30 PSI while staging up rotary speed to 140 rpm's with 1 OK TO for breaking in the RCD Bearing and reciprocating down to 23,395 -ft. 9/18/2017 9/19/2017 8.50 PROD2 DRILL DDRL P Control drill from 23,395 -ft to 23,472 -ft 23,395.0 23,472.0 15:30 00:00 MD / 7,449 -fl while displacing well bore from 10.8 ppg NaBr pumping 40 BBL'S high visc spacer followed by 858 BBL's of 9.3 ppg Flo Pro at 220 GPM at 2,140 PSI at 140 RPM's w/ 11.72 ECD. UP wt = 215K, ON wt = 11 OK and 160K ROT wt. w/ 12K ON and 8K ON 9/192017 9/192017 12.00 PROD2 DRILL DDRL P Directional drill from 23,472' MD to 23,472.0 24,178-0- 00:00 12:00 24,178' MD, 7,467' TVD. ADT=10.14 hrs, P/U=205k, S/0=100k, ROT=147k, Tq on/off=13.51k/9k, 220 gpm, 2350 psi, ECD=11.75 ppg EMW. Time drill down through hard streak @ 23,500' MD, increase ROP to —200 fph with intermittent hard streaks. Good steering ability. OA=500 psi @ 12:00 hrs. Page 39145 Report Printed: 10116/2017 . perations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Stan7une End Time DW (hr) Phase Op Code AWvdy Code Time P -T -x Operation ftKB) End Dexh(fiKB) 9/19/2017 9/20/2017 12.00 PROD2 DRILL DDRL P Directional drill from 24,178 MD to 24,178.0 24,660.0 12:00 00:00 24,660' MD, 7'455 TVD. ADT=10.14 hrs, P/U=205k, S/0=100k, ROT=147k, Tq on/off-13.5k/9k, 220 gpm, 2350 psi, ECD=11.75 ppg EMW. Time drill down through hard streak @ 23,500' MD, increase ROP to -200 fph with intermittent hard streaks. Good steering ability. Exit out bottom and intoMduveach from 24,327' to 24,510' due to formation dip drastically change from -88.5 to -93 degree. Limit WOB to 13K to avoid buckling as per SLB model. Increase connection pressure from 500 psi to 700 psi to reduce magnitude of pressure cycles on shale after excurse out of zone. OA=540 psi @ 00:00 hrs. 9/20/2017 9/20/2017 12.00 PROD2 DRILL DDRL P Directional drill from 24,660' MD to 24,660.0 25,988.0 00:00 12:00 25,988' MD, 7,448' TVD. ADT=8.55 hrs, P/U=225k, S/O=N/A, ROT=147k, Tq on/off=16k/gk, 220 gpm, 3000 psi, ECD=12.2 ppg EMW. Perform 275 bbl whole mud dilution @ 25,400' MD for ECD and ROP improvement. Slowly increase lubricant to 1.5%. Lost SOW @ 25,226' MD OA=650 psi @ 12:00 hrs. 9/20/2017 9/21/2017 12.00 PROD2 DRILL DDRL P Directional drill from 25,988' MD to 25,988.0 27,170.0 12:00 00:00 27,179 MD, 7,450' TVD. ADT=8.44 hrs, P/U=225k, S/0=N/A, ROT=147k, Tq onloff=18k/9k, 220 gpm, 3000 psi, ECD=12.1 ppg EMW. Perform 275 bbl whole mud dilution @ 26,500' MD for ECD and ROP improvement. Maintain lubricant to 1.5%. OA=650 psi @ 12:00 hrs. 9/21/2017 9121/2017 9.00 PROD2 DRILL DDRL P Directional drill from 27,170' MD to 27,170.0 27,798.0 00:00 09:00 27,798' MD, 7,469' TVD. ADT=6.73 hrs, P/U=245k, S/O=NIA, ROT=145k, Tq on/off-17.5k/12,5k, 220 gpm, 3200 psi, ECD=12.22 ppg EMW. Perform 550 bbl whole mud dilution @ 27,610' MD for ECD, lubricity and ROP improvement. Maintain lubricant to 1.5%. Holding 700 psi with MPD on connections. Call TD @ 27,798' MD due sand thickness. Page 40145 ReportPrinted: 10/16/2017 operations Summary (with Timelog uepths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Our (hr) Phase Op Code Mvity Code Time P -T-% Operaeon Start Depth (ftKB) End Depth (111(8) 9/2112017 9/21/2017 9.00 FROM CASING CIRC P Circulate and condition @ 220 gpm, 27,798.0 27,703.0 09:00 18:00 3130 psi, 120 rpm, 12.5k Tq. Rack back stand after bottoms up. Finger print PP after 2 BU, Trap 700 psi choke pressure, bleed down to 465 psi, monitor, no pressure increase. Continue circulate hole clean after finger print. Rack back a stand after each BU. Circulate 4.5 bottom up total. OA=550 psi @ 12:00 hrs. 9/21/2017 9/21/2017 0.50 PROD2 CASING BKRM P Attemp to slack off to check slack off 27,703.0 27,607.0 18:00 18:30 weight, no go. Back reaming out of hole to 27,224' while preparing for displacment. 9/21/2017 9/21/2017 4.00 PROD2 CASING DISP P Displace to 10.7 ppg viscosifted brine 27,607.0 27,607.0 18:30 22:30 with 210 gpm, 80 rpm. 9/21/2017 9/21/2017 0.25 PROD2 CASING OWFF P Take SCR, flow check 10 minutes, 27,607.0 27,607.0 22:30 22:45 hole static. Slack off string weight 105K. 9/21/2017 9/2212017 1.25 PROD2 CASING SMPD P Strip out vdith MPD to 26,700'. Holding 27,607.0 26,700.0 22:45 00:00 180 psi pulling and 60 psi in slips. 9/22/2017 9/22/2017 3.75 PROD2 CASING SMPD P Continue SOOH from 26,755'to 26,700.0 24,273.0 00:00 03:45 24,178' per schedule, hold 180 psi/60 psi pulling/slips. Obain slack off weight every 10 stands, pull tight in Miluveach at 24,377'(30-35k overpull. RIH to 24,273, good slack off weight 9/22/2017 9/22/2017 0.75 PROD2 CASING SMPD T Pull from 24,273'to 24,083'w/210 24,273.0 24,083.0 03:45 04:30 gpm. Attempt to SOOH again and pull tight at 24,045'. Decision made to circulate and condition hole. 9/22/2017 9/2212017 2.00 PROD2 CASING CIRC T Condition hole from 24,083' to 23,987' 24,083.0 23,987.0 04:30 06:30 with 120 rpm and 210 gpm, 1.2 BU. 9/22/2017 9/22/2017 5.50 PROD2 CASING SMPD P Continue strip out into shoe at 19,322' 23,987.0 19,322.0 06:30 12:00 per schedule. 9/22/2017 9/22/2017 1.50 PROD2 CASING CIRC P Circulate BU at 210 gpm, 80 rpm. 19,322.0 19,322.0 12:00 13:30 reciprate from 19,322' to 19,226'. 9122/2017 9/22/2017 0.50 PROD2 CASING OWFF P Flow check well for 30 minutes, static. 19,322.0 19,322.0 13:30 14:00 9/22/2017 9/23/2017 10.00 PROD2 CASING SMPD P Continue SOOH to 4,184' per 19,322.0 4,184.0 14:00 00:00 schedule, good hole fill. OA pressure @ 22:00 hrs = 0 psi. Total fluid lose to formation today: 9/23/2017 9/23/2017 4.00 PROD2 CASING SMPD P Continue SOOH to 989', lay down 41 4,184.0 989.0 00:00 04:00 stands DP sideway per plan. 9/23/2017 9/23/2017 0.25 PROD2 CASING OWFF P OWFF, flow check -static. PJSM blow 989.0 989.0 04:00 04:15 donw and pull MPD bearing/element. 9/23/2017 9/23/2017 0.50 PROD2 CASING MPDA P Flush MPD lines and choke manifold. 989.0 989.0 04:15 04:45 Remove MPD bearing, install trip nipple. 9/23/2017 9/23/2017 0.50 PROD2 CASING TRIP P POOH on elevator from 989' to 312', 989.0 312.0 04:45 05:15 lay down DP sideway per plan. good hole fill. 9/23/2017 9/23/2017 0.25 FROM CASING OWFF P Flow check well (static), PJSM on 312.0 312.0 05:15 05:30 laying down BHA. Page 41/45 Report Printed: 10N6/2017 �perations Summary (with Timelog L epths) CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log star Depth Start Time End Time our (no Phase Op Cove AG n Code Time P -T -X Operation (We, End Depth (ftKa) 9/23/2017 9/23/2017 1.50 PROD2 CASING BHAH P F/312' to surface, lay down jars, install 312.0 0.0 05:30 07:00 single 4" HWDP for liner win, rack back in derrick. continue lay down BHA per DD. 9/23/2017 9/23/2017 2.50 COMPZN CASING RURD P Clean and Gear rig floor, rig up 0.0 0.0 07:00 09:30 equipment to run 4.5" TXP liner as per detail. (Simops-monitor well on T.T- 1.5bb1 lose per period). 9/23/2017 9/23/2017 1.00 COMPZN CASING PUTB P P/U 1st joint 4.5" liner, make up to 0.0 0.0 09:30 10:30 orange peel shoe and torque to 7k with torque turn equipment. As per Tenaris rep and test same (note backup tong slip and not able to grip pipe, decide to change out stack tong) 9/23/2017 9/23/2017 1.00 COMPZN CASING RURD T R/D stack tong and change out to new 0.0 0.0 10:30 11:30 stack power tong and test same as per Tenaris rep, perform dump test, good. 9/23/2017 9/23/2017 0.50 COMPZN CASING SFTY P PJSM on running 4.5" liner as per 0.0 0.0 11:30 12:00 running detail (change out lift ram/spring for power tong). 923/2017 9/24/2017 12.00 COMPZN CASING PUTB P Ru 4.5" 12.6# TXP liner as per tally to 0.0 5,627.0 12:00 00:00 5,627'. 137 joints. 9/24/2017 924/2017 7.00 COMPZN CASING PUTB P Continue run 4.5" liner to 8,567'. 5,627.0 8,567.0 00:00 07:00 9/24/2017 924/2017 1.00 COMPZN CASING OTHR P Change elevator to 4" DP, P/U liner 8,567.0 8,605.0 07:00 08:00 hanger assembly, Bowen bumper sub assy, 4" XT -39 x 3.5" IF X/O and make up same as per BOT. Obtain P/U 120k, S/O 96k. 9/242017 9/24/2017 1.00 COMPZN CASING CIRC P RIH w/1 stand DP, circulate through 8,605.0 8,605.0 08:00 09:00 liner hanger w/2bpm/60psi w/10.7 ppg vis brine. Simops-R/D liner running equipment. 9/24/2017 9/242017 6.50 COMPZN CASING RUNL P Continue run 4.5" liner to caisng shoe 8,605.0 19,200.0 09:00 15:30 at 19,200'. 9/24/2017 924/2017 2.50 COMPZN CASING PULD P P/U and R/B 20 stands HWDP. 19,200.0 19,200.0 15:30 18:00 9/242017 9/24/2017 0.25 COMPZN CASING OTHR P Take P/U and S/O weight, attempt to 19,200.0 19,200.0 18:00 18:15 rotate string, stall at 6.6k. Work out torque. P/U 190k, S/O 1201k. 9242017 9/25/2017 5.75 COMPZN CASING RUNL P Continue run liner on DP stands to 19,200.0 27,357.0 18:15 00:00 1 27,357' MD. 925/2017 9/25/2017 0.25 COMPZN CASING RUNL P RIH 4.5" TXP liner on 4" DP 27,357.0 27,798.0 00:00 00:15 stands. 9/25/2017 9252017 0.75 COMPZN CASING CIRC P Tag botom @ 27,798', P/U to 27,798.0 27,798.0 00:15 01:00 27,746', M/U topddve and break circulation to confirm good flow path. Break connection and drop 1.625" ball. P/U 255k, S/O 130k. Page 42145 Report Printed: 10116/2017 wperations Summary (with Timelog L epths) I:: CD5-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth StaM1Time End Time Dur(ho Phase OP Catle Activity Cotle Tim P -T-% Operation /aka EM Depth (flKa) 9/25/2017 9125/2017 0.75 COMPZN CASING PACK P Set liner hanger as per BOT rep. 27,798.0 27,798.0 01:00 01:45 Circulation ball to seat at 2.8 bpm rate. Ball on seat @ 1546 stks. Increase to 2,200 psi. S/O to 70k (confirm hanger set), increase to 4,000 psi. S/O t0 60k, bleed off string. P/U to 235k (confirm release). Pick up 5', set ZXP packer as per BOT rep. ROT 180k 20 rpm/9k torque. S/O to 130 k P/U to 190 k, S/O to 115k, P/U to 180 k, S/O to 140 k (confirm packer set). Liner top @ 19,170', shoe depth @ 27,778'. 9/25/2017 9/25/2017 1.00 COMPZN CASING PRTS P R/U test equipment, and test ZXP 19,170.0 19,170.0 01:45 02:45 packer through annular with 3,300 psi, 10 minutes. Bleed off, rig down equipment. 9/25/2017 9/25/2017 0.75 COMPZN WELLPR PMPO P Pump out single to wash PBR. UD 19,170.0 19,170.0 02:45 03:30 signle, Confirmed release from PBR assembly as per BOT rep. 9125/2017 9125/2017 2.00 COMPZN WELLPR CIRC P M/U to Topdrive, circulate BU w/4 19,170.0 19,170.0 03:30 05:30 bpm. (Simops-slip & cut 68' drill line, service TD). 9/25/2017 9/25/2017 0.25 COMPZN WELLPR OWFF T Flow check well (vis brine out of 19,170.0 19,170.0 05:30 05:45 balance, decision to continue circulate 9/25/2017 9/25/2017 0.75 COMPZN WELLPR CIRC T Continue to circulate 2nd BU @ 19,170.0 19,170.0 05:45 06:30 8BPM, 10.7 ppg in/out confirmed via mud check. 9/25/2017 9/25/2017 0.50 COMPZN WELLPR OWFF P Flow check well for 30 minutes, 19,170.0 19,170.0 06:30 07:00 good. 9/25/2017 9126/2017 17.00 COMPZN WELLPR PULD P B/D Topdrive. Line up on Trip 19,170.0 5,630.0 07:00 00:00 Tank. POOH w/liner hanger running tool and UD drill pipe sideways. 9/26/2017 9/26/2017 5.00 COMPZN WELLPR PULD P POOH w/ liner running tool and UD 4" 5,630.0 59.0 00:00 05:00 DP f/ 5,676' t0 59' MD. 9/26/2017 9/26/2017 0.75 COMPZN WELLPR SHAH P UD liner running tool as per Baker. 59.0 0.0 05:00 05:45 9/2612017 9/26/2017 0.75 COMPZN RPCOMP WWWH P Pulled wear ring and M/U stack 0.0 0.0 05:45 06:30 washer. Flushed stack with water, drained and filled w/ 10.7 ppg vis. brine. 9/26/2017 9/26/2017 1.50 COMPZN RPCOMP RURD P Cleaned and cleared the rig Floor. R/U 0.0 0.0 06:30 08:00 4.5" Hyd563 running equipment and P/U completions components. 9/26/2017 9/26/2017 15.00 COMPZN RPCOMP PUTS P R1H w/ 4.5" Hyd563 completion string 0.0 19,170.0 08:00 23:00 as per tally from surface to 19,170' MD. PIU= 180, S/0= 107. 9/2612017 9/26/2017 0.50 COMPZN RPCOMP HOSO P Washed down f/ 19,166'w/ 1 bpm, 19,170.0 19,183.0 23:00 23:30 140 psi and observed seals engage at 19,169' MD w/ 210 psi. continued down to NoGo and S/O 10k at 19,183' MD. 9/26/2017 9/27/2017 0.50 COMPZN RPCOMP PRTS P Lined up and tested seals w/ 230 psi 19,183.0 19,131.0 23:30 00:00 on the back side, Seals held. Bleed off and UD Its # 471 and 470. Page 43/45 ReportPrinted: 10/16/2017 operations Summary (with Timelog uepths) CD5-316 • Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X operation (itKB) End Depth(aKB) 9/27/2017 9/27/2017 1.25 COMPZN RPCOMP HOSO P MIU 3.83' and 7.78' space out pups 19,131.0 19,151.0 00:00 01:15 and jnt# 469 and RIH. PIU the landing joint and M/U 4 112" tubing hanger. Pi 175, S/0= 107. SimOps, M/U circulating equipment. 9/27/2017 9/27/2017 3.00 COMPZN RPCOMP CRIH P Displaced well to 10.5 ppg brine w/ 5 19,151.0 19,151.0 01:15 04:15 bpm, 840 psi. Spotted 270 bbl of corrosion inhibited brine on the back Side f/ 2114' to 19,151' MD. 9/27/2017 9/27/2017 0.50 COMPZN RPCOMP OWFF P OWFF, Well Static. 19,151.0 19,151.0 04:15 04:45 9/27/2017 9/27/2017 0.50 COMPZN RPCOMP THGR P Drained stack and RIH with tubing 19,151.0 19,181.3 04:45 05:15 hanger. Landed hanger with shoe at 19181.3. RILDS as per FMC. 9/27/2017 9/27/2017 0.75 COMPZN RPCOMP PRTS P R/U testing equipment and tested the 19,181.3 19,181.3 05:15 06:00 IA and seals to 1000 psi and held for 10 min. Broke off testing manifold and dropped 1.875" ball and rod. 9/27/2017 9/27/2017 2.00 COMPZN RPCOMP PRTS P Pressure tested 4 1/2" tubing to 4200 19,181.3 19,181.3 06:00 08:00 psi and held for 30 min. Bleed off to 2500 psi and tested the IA to 3300 psi for 30 min. Bled off both IA and tubing. 9127/2017 9127/2017 0.75 COMPZN RPCOMP CIRC P Pressured up the IA to 3100 psi and 19,181.3 19,181.3 08:00 08:45 sheared SOV. pumped through valve w/ 1 bpm, 260 psi to confirm communication. 9/27/2017 9/27/2017 1.50 COMPZN WHDBOP MPSP P LID landing joint and installed 4" HP- 19,181.3 0.0 08:45 10:15 BPV as per FMC. Tested valve from below to 2500 psi for 15 min and charted. SimOps, cleaned and cleared rig floor of tubing tubing equipment. 9/27/2017 9/27/2017 1.75 COMPZN WHDBOP WWWH P M/U stack washer and flushed same 0.0 0.0 10:15 12:00 with water. BID T/D, circ. lines, and choke line. 9/27/2017 9/27/2017 5.50 COMPZN WHDBOP OWFF P Cleaned out rotary table, flow box, drip 0.0 0.0 12:00 17:30 pan, and TD. Prepped pumps for move and started cleaning pits. Broke bolts on ram doors and prepped for removal. 9/27/2017 9/27/2017 2.00 COMPZN WHDBOP MPDA P RID MPD equipment, flow box, and 0.0 0.0 17:30 1930 orbit valve. 9127/2017 9/27/2017 4.00 COMPZN WHDBOP NUND P Removed rams from BOP stack. 0.0 0.0 19:30 23:30 Pulled away choke and kill lines. WD BOP stack and removed 3'spacing spool. 9/27/2017 9/28/2017 0.50 COMPZN WHDBOP NUND P prepped wellhead to N/U tree. 0.0 0.0 23:30 00:00 9/28/2017 9/28/2017 2.25 COMPZN WHDBOP NUND P N/U tree to wellhead as per FMC. 0.0 0.0 00:00 02:15 Installed BPV test dart and pressure tested adapter seal to 250/5000 psi. 9128/2017 9/2812017 3.00 COMPZN WHDBOP PRTS P R/U testing equipment and filled tree 0.0 0.0 02:15 05:15 with diesel. Attempted to test tree and observed leaks at the needle valve assy and production port flange. Tightened connections and tested again to 250/5000 psi for 10 min and charted. Page 44145 Report Printed: 10/16/2017 operations Summary (with Timelog uepths) CDS-316 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (m) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth hi 9/28/2017 9/28/2017 0.75 COMPZN WHDBOP MPSP P Pulled test dart and secured well. 0.0 0.0 05:15 06:00 9/28/2017 9/28/2017 0.75 DEMOB MOVE RURD P Clean and cleared the rig floor and 0.0 0.0 06:00 06:45 prepped for rig move. Stri cleaned pits. 9/28/2017 9/28/2017 8.25 DEMOB MOVE PULD P L/D 70 stands of 4" DP. SimOps, Rig 0.0 0645 15:00 down and prep for move. Serviced lines to rig down and freeze protected. Continued to work on rig move check list. Page 45/45 ReportPrinted: 10/16/2017 NADConversion Western North Slope CD5 Alpine West Pad CDS-316 CD5-316 ConocoPhillips Definitive Survey Report 25 October, 2017 ConocoPhillips ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CDS-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CDS-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level San, Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Yell CDS-316 Audit Notes: To Yell Position +WS 0.00 usft Nothing: 5,965,834.52 usft Latitude: 70° 18'419.511 13,873.32 +E/ -W 0.00 usft EasUng: 349,25043 usft Longitude: 151° 13' 18.4444 'osition Uncertainty Well 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usf Voilboro CD5-316 Aagnetics Model Name Sample Date Declination Dip Angle Field Strength 11 r) 011) 13GGM2017 9/5/2017 17.00 80.79 57,451 Design CD5316 Date Audit Notes: To Map Map Version: 1.0 Phase: ACTUAL Te On Depth: 13,873.32 Vertical Section: Depth From (TVD) +WS +E/ -W Direction 1,133.92 (usft) Well (usft) rl 2,386.06 36.44 0.00 0.00 220.00 Survey Program Date From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 98.80 1,076.25 CD5-316 Srvy 1 - SLB _GWD70 (CDS-31 GVD-GC-SS Gymdata gyro single shots 7/25/2017 10:27 1,133.92 2,289.67 CDS-316 Srvy 2-SLBWD+GMAG(C M MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/25/201710:29 2,386.06 13,800.59 CD5-316 Srvy 3-SLBMWD_GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/30/201710:19. 13,873.32 13,873.32 CD5-316PB1 Srvy 1 - SHI_MWD+IFR+M MWD+IFR-AK-CAZSC MWD+IFR AK CAZ SCC 8/12/2017 1:44:, 13,935.17 19,278.96 CD5-316 Srvy 4- SLB _MWD+GMAG(C MWD+IFR-AK-CAZ-SC W MD+IFRAKCAZSCC 8/29/2017 9:38:, 19,341.54 23,336.41 CD5.316 Srvy 5 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 9/13/2017 10:11: 23,356.49 27,738.41 CD5-316 Srvy 6 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 9/18/2017 9:02, 10/25/2017 10:30:25AM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Nothing Ending OLS Section Wall" (*) rl (usft) (usft) (usft) (usft) (ft) (ft) (°/1999 (ft) Survey Tool Name 38.44 0.00 0.00 36.44 -34.00 ODO 000 5,965,834.52 349,250.43 0.00 ODD UNDEFINED 98.80 0.65 306.44 98.80 28.36 0.21 428 5,965,834.74 349,250.15 1.04 0.02 GYD-GC-SS 1 115.50 0.58 299.53 115.50 45.06 0.31 4.43 5,965,834.84 349,25000 0.61 0.04 NDT BD ActDel $Yrvey 20„ 150.56 0.47 279.10 150.56 80.12 0.42 -0.73 5,965,834.95 349,249.71 0.61 0.15 GVD-GC-SS(1) 245.62 0.76 217.62 245.61 175.17 -0.02 -150 5,965,834.53 349,248.93 0.71 0.98 GVD-GC-SS(1) 335.79 1.74 206.74 335.76 265.32 -1.72 -2.48 5,955,832.85 349,247.92 1.11 2.91 GVD-GC-SS(1) 427.34 3.20 208.74 427.22 356]8 5.20 4.34 5,965,82941 349,245.99 1,60 6.77 GVD-GC-SS(1) 519.79 3.76 200.76 519.50 449.06 -10.29 -6.65 5,965,824.36 349,243.57 0.80 12.16 GVD-GCSS(1) 10/25/2017 10:30:25AM Page 2 COMPASS 5000.14 Build 85 Conocoftillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CDS-316 Project: Western North Slope ND Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5J76 North Reference: True Wellbore: CDS-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +W -S +EI -W Northing Easting DLS Section (usfq 11 11 (usfq Will Wall" (ust) (ft) (ft) (°11007 (ft) Survey Toot Nems 611.07 4.09 20045 610.57 540.13 -16.14 5.85 5,965,818.56 349,241.26 0.36 1805 GYD-GC-SS(1) 704.45 644 205.35 703.55 633.11 -24.00 -12.25 5,965,81077 349,237]0 2.56 26.26 GYD-GC-S$(1) 79821 8.71 217.65 796.49 726.05 -4.37 -1884 5,965,800.54 349,230.90 2.96 38.44 GYD-GCSS(1) 686.96 10.41 220.02 884.00 813.56 45.83 -28.11 5,965,789.26 349,221.41 1.97 53.18 GYD-GCSS(1) 980.35 13.09 219.37 975.43 904.99 50.47 40.24 5,965,774.87 349,208.99 2.87 72.19 GYD4CSS(1) 1,076.25 14.64 218.95 1,068.53 998.09 -78.30 -54.75 5,965,75735 349,194.12 1.62 9517 GYD-GC-SS(1) 1,133.92 15.05 21725 1,124.28 1,053.84 -89.92 53.86 5,965,745.90 349,18418 1.04 109.94 MW0+IFR-AK-CAZSC(2) 1,228.42 17.38 216.17 1,215.01 1,144.57 -111.09 -7962 5,955,725.06 349,168.60 2.49 136.28 MWD+IFR-AK-CAZ-SC(2) 1,322.21 20.22 214.80 1,303.79 1,233.35 -135.71 -97.14 5,965,700.80 349,150.59 3.06 166.40 MWD+IFR-AK-CAZ-SC(2) 1,416.81 22.32 213.82 1,391.94 1,321.50 -164.06 -116.47 5,965,672.84 349,130.70 2.25 200.54 MWD+IFR-AK-CAZ-SC(2) 1,511.00 25.02 211.11 1,478.20 1,407.76 -195.98 -136.72 5,965,641.34 349,109.81 3.09 236.01 MWD+IFRAK-CAZSC(2) 1,605.89 27.26 210.76 1,563.38 1,492.94 -231.84 -158.21 5,965,605.92 349,08781 2.37 279.29 MWD+IFR-AK-CAZSC(2) 1,700.39 29.85 210.65 1,846.38 1,575.94 -270.67 -181.27 5,965,567.56 349,063.78 2.74 323.87 MWD+IFR-AK-CAZ-SC(2) 1,794.72 31.79 211.13 1,727.38 1,656.94 -312.14 -206.09 5,965,526.60 349,038.13 2.07 371.59 MWD+1FR-AK-CAZ-SC(2) 1,868.64 31.72 211.24 1,807.24 1,736.80 -35443 -231.68 5,965,4(14.84 349,011.70 0.10 420.43 MWD+IFR-AK-CAZ-SC (2) 1,983.09 3492 211.36 1,886.16 1,815.72 -398.75 -258.63 5,965,441.07 348,983.86 3.39 471.71 MWD+IFR-AK-CAZSC(2) 2,077.54 3808 212.07 1,962.07 1,891.63 446.53 -288.17 5,985,393.90 348,953.37 3.38 527.30 MWD+IFR-AK-CAZSC(2) 2,172.54 39.77 21411 2,035.98 1,965.54 496.34 -321.04 5,965,344.76 34@,919.52 2.49 586.58 MWD+IFR-AK-CAZ-SC(2) 2,26209 41.58 217.53 2,107.69 2,037.25 546.09 -357.38 5,965,295.75 348,882.19 2.73 648.05 MWD+IFR-AK-CAZ-SC(2) 2,289.67 42.28 216.89 2,124.49 2,054.05 -558.11 -366.50 5,965,283.92 348,B72.83 3.63 663.12 MWD+IFR-AK-CAZ-SC(2) 2,360.00 42.36 217.87 2,176.50 2,106.06 595.74 395.24 5,965,24688 348,843.33 0.94 710.42 NOT an Actual Survey 13 318" x 16" 2,386.06 42.39 218.23 2,195.75 2,125,31 509.57 408.07 5,985,233.27 348,83223 0.94 727.97 MWD+IFR-AK-CAZ-SC (3) 2.45ZW 43.15 218.86 2,244.21 2,173.77 544.63 434.01 5,985,198.78 348,803.60 1.32 772.79 MWD+11FR-AK-CAZ-SC(3) 2,54732 46.71 216.49 2,311.91 2,24147 597.36 476.20 5,965,146.92 348,760.36 3.73 840.30 MWD+IFR-AK-CAZ-SC(3) 2,641.16 48.40 219.76 2,374.97 2,304.53 -750.64 519.72 5,965,094.32 348,715.78 2.07 909.24 MWD+1FR-AK-CAZ-13C(3) 2,735.35 51.15 220.19 2,435.79 2,365.35 -805.94 565.92 5,965,040.16 348,668.49 2.94 981.15 MWD+IFR-AK-CAZSC(3) 2,829.83 53.68 221.57 2,493.42 2,422.98 562.53 514.93 5,964,984.57 348,618.36 2.92 1,056.00 MWD+1FR-AK-CAZSC(3) 2,924.19 55.90 224.14 2,547.82 2,477.38 -91902 567.37 5,964,929.15 348,564.79 3.24 1,132.99 MWD+IFR-AK-CAZ-SC(3) 3,018.35 58.10 225.51 2,599.11 2,528.67 -975.02 -723.04 5,964,87429 348,508.01 2.64 1,211.7 MWD+IFR-AK-CAZ-SC(3) 3,110.07 60.11 226.51 2,64820 2,575.76 -1,029.67 -779.67 5,964,820.78 348,450.31 2.38 1,289.93 MWD+1FR-AK-CAZSC(3) 3,202.95 62.28 226.88 2,690.95 2,620.51 -1,085.50 538.86 5,964,766.16 348,389.99 2.36 1,370.76 MWD+IFR-AK-CAZSC(3) 3,298.68 64.25 227.52 2,734.01 2,663.57 -1,143.59 -901.60 5,964,70934 348,326.12 2.15 1,455.58 MWD+IFR-AK-CAZSC(3) 3,390.58 66.82 229.53 2,772.07 2,701.63 -1,198.97 -964.28 5,964,65524 348,262.35 3.43 1,538.29 MWD+IFR-AK-CAZ-SC(3) 3,485.15 8906 229.99 2,807.59 2,737.15 -1,255.59 .1,031.18 5,964,59998 348,194.33 2.41 1,624.66 MWD+IFR-AK-CA7-SC(3) 3,579.71 69.67 229.04 2,840.91 2,770.47 -1,313.04 -1,09848 5,964,543.89 348,125.89 1.14 1,711.94 MWD+IFR-AK-CAZ-SC(3) 3,673.45 70.78 22863 2,872.63 2,802.19 -1,371.10 -1,164.89 5,964,487.18 348,058.34 125 1,799.10 MWD+IFR-AK-CAZSC(3) 3,76464 72.03 228.00 2,901.71 2,831,27 -1,428.58 -1,229.43 5,964,431.01 347,992.66 1.52 1,884.82 MWD+IFR-AK-CAZ-SC(3) 3,858.96 71.97 226.95 2,930.85 2,000.41 -1,489.21 -1,295.54 5,964,371.73 347,925.35 1.06 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3,953.82 72.25 225.76 2,959.99 2,889.55 -1,55152 -1,360.86 5,964,310.75 347,85879 1.23 2,063.28 MWD+IFR-AK-CAZSC(3) 10,25,201710:30:25AM Page 3 COMPASS 5"..14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well C135-316 Project- Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Ske: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-318 Survey Calculation Method! Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Sumay Map Map Vertical MD Inc Azi TVD TVDSS +WS *EJ -W Northing Easting DLS Section (waft) 0 11 (usft) Want) (waft) Wall" (ft) (ft) 1°iloo') (ft) Survey Tool Name 4,047.32 7250 224.30 2,988.23 2,917.79 -1,614.51 -1,423.92 5,964,249.04 347,794.49 1.53 2,152.07 MWD+1FR-AK-CAZ-SC(3) 4,141.31 72.55 223.34 3,016.38 2,945.94 -1,67921 -1,486.01 5,964,185.60 347,731.12 0.98 2,241.54 MWD+IFR-AK-CAZ-SC(3) 4,236.41 7258 223.08 3,044.79 2,974.35 -1,745.36 -1,548.15 5,964,120.72 347,657.67 0.29 2,332.16 MWD+IFR-AK-CAZ-SC(3) 4,330.72 72.54 223.28 3,072.98 3,002.54 -1,81099 -1,609]4 5,964,056.35 347,604.78 0.25 2,422.02 MWD+IFR-AK-CAZ-SC(3) 4,42363 72.56 223.72 3,100.84 3,030.40 -1,875.28 -1,670.75 5,963,993.30 347,542.49 0.45 2,510.49 MWD+IFR-AK-CAZ-SC(3) 4,517.57 72.58 224.24 3,126.98 3,058.54 -1,939.78 -1,732.99 5,963,93007 347,478.98 0.53 2,599.90 MWD+IFR-AK-CAZSC(3) 4,612.69 7258 22364 3,157.45 3,087.01 -2,005.13 -1,795.96 5,963,886.00 347,414.71 0.60 2,690.44 MWD+IFR-AK-CAZSC(3) 4,705.14 72.60 224.42 3,185.12 3,11458 -2,068.55 -1,85727 5,983,803.83 347,352.14 051 2,77843 MWD+IFR4K-CAZ-SC(3) 4,798.99 72.07 224.13 3,213.59 3,143.15 -2,132.58 -0919.70 5,963,741,07 347,288.44 0.64 2,867.61 MWD+IFR-AK-CAZ-SC(3) 4,694.64 7159 224.49 3,243.42 3,172.98 .2,197.61 -1,983.18 5,963,677.33 347,22367 0.62 2,958.23 MWD+IFR-AK-CAZ-SC(3) 4,989.18 71.53 225.26 3,273.33 3,202.89 -2,261.16 -2,048.46 5,963,61506 347,159.14 0.78 3,047.59 MWD+IFR-AK-CAZ-SC(3) 5,083.50 71.53 22544 3,303.21 3,232.77 -2,324.04 -2,110.11 5,963,553.49 347,094.25 0.18 3,136.67 MM+IFR-AK-CAZSC(3) 5,178.53 71.56 225.79 3,333.29 3,262.85 -2,387.09 -2,174.53 5,963,491.75 347,028.58 0.35 3,226.38 MWD+IFR-AK-CAZSC(3) 5,272.95 71.57 226.43 3,363.15 3,292.71 -2,449.19 -2,239.08 5,963,430.96 346,962.60 0.64 3,315.44 MWD+11FR-AK-CAZSC(3) 5,36645 71.53 22595 3,392.74 3,322.30 -2,51059 -2,303.09 5,963,370.86 346,89758 049 3,403.62 MWD+IFR-AK-CAZSC(3) 5,461.40 71.56 225.45 3,422.80 3,352.35 -2,57347 -2,367.56 5,963,309.29 346,831.86 0.47 3,493.24 MWD+IFR-AKCAZ-SC(3) 5,555.27 71.56 225.52 3,452.49 3,382.05 -2,635.89 -2,431,08 5,963,248.16 346,767.10 0.04 3,581,86 MWD+IFR-AKCAZ-SC(3) 5,649.96 71.58 225.23 3,482.44 3,412.00 -2,698.99 -2,495.01 5,963,18836 346,701.92 0.29 3,671.31 MWD+IFR-AKCAZ-SC(3) 5,744.30 71.57 225.19 3,512.27 3,441.83 -2,762.04 -2,558.53 5,963,124.60 346,637.16 0.04 3,76044 MWD+IFR-AK-CAZSC(3) 5,838.77 71.53 225.67 3,542.17 3,471.73 -2,824.93 -2,622.37 5,963,053.01 346,572.07 048 3,849.65 MWD+IFR-AK-CAZ-SC(3) 5,933.26 71.50 225.31 3,572.13 3,501.69 -2,887.76 -2,686.27 5,963,001.49 346,506.92 0.36 3,938.85 MWD+IFR-AK-CAZ-SC(3) 6,027.10 71.57 225.81 3,601.85 3,531.41 -2,95008 -2,749.83 5,962,940.46 346,442.14 0.51 4,027.44 MWD+IFR-AK-CAZSC(3) 6,120.92 71.56 224.80 3,631.52 3,561.08 3,012.68 -2,813.09 5,962,879.15 346,377.63 1.02 4,116.07 MWD+IFR-AKCAZ-SC (3) 6,214.35 71.53 224.80 3,661.10 3,590.66 -3,075.56 -2,875.54 5,962,817.53 346,313.94 0.03 4,204.38 MWD+IFR-AKCAZ-SC(3) 6,308.67 71.56 224.24 3,690.96 3,620.52 3,139.35 -2,938.28 5,962,755.02 346,249.94 0.56 4,293.57 MWD+IFR-AK-CAZ-SC(3) 6,402.34 71.63 224.69 3,720.53 3,650.09 3,202.78 3,000.53 5,962,692.86 $46,18643 0.46 4,382.18 MWD+IFR-AK-CAZSC(3) 6,497.20 71.40 224.47 3,750.61 3,680.17 3,268.86 3,063.68 5,962,630.06 346,122.01 0.33 4,471.86 MWD+IFR-AK-CAZSC(3) 6,591.37 71.57 224.87 3,780.51 3,710.07 3,330.37 3,126.46 5,962,667.84 346,057.98 0.44 4,560.86 MWD+IFR-AK-CAZ-SC(3) 6,684.55 71.51 225.26 3,810.02 3,739.58 3,392.80 3,189.02 5,962,506.68 345,994.17 0.40 4,648.90 MWD+IFR-AK-CAZ-SC(3) 6,778.69 71.44 224.85 3,839.93 3,769.49 -3,455.85 -3,252.20 5,962,444.91 345,929,74 0.42 4,737.81 MWD+IFR-AK-CAZ-SC(3) 6,873.27 71.44 224.69 3,870.03 3,799.59 -3,519.51 -3,315.35 5,962,382.54 345,865.34 0.16 4,827.16 MWD+1FR-AKCAZ-SC(3) 6,956.71 71.51 225.08 3,899.72 3,829.28 -3,582.28 3,377,87 5,962,321.04 345,801.57 0.40 4,915.44 MWD+IFR-AKCAZ-SC(3) 7,061.41 71.50 225.09 3,929.76 3,859.32 -3,645.69 -3,44147 5,962,268.92 345,736.72 0.01 5,004.89 MWD+IFR-AK-CAZSC(3) 7,155.57 71.47 225.07 3,959.66 3,889.22 3,708.74 3,504.69 5,962,197.16 345,672.25 0.04 5,093.83 MWD+IFR-AK-CAZ-SC (3) 7,251.39 71.42 225.05 3,990.15 3,919.71 3,772.90 -3,568.99 5,962,13431 345,606.68 0.06 5,184.32 MWD+IFR-AKCAZ-SC(3) 7,346.55 72,03 225.48 4,019.99 3,949.55 3,836.50 3,633.18 5,962,07202 345,541.23 0.77 5,274.29 MW +IFR-AKCAZ-SC(3) 7,438.01 7198 224.44 4,048.25 3,977.61 3,898.05 3,694.85 5,962,011.72 345478.55 1.08 5,36095 MWD+IFR-AK-CAZSC(3) 7,532.62 71.95 224.60 4,077.53 4,007.09 3,962.20 3,757.73 5,961,946.86 345,414.20 0.16 5,45064 MWD+IFR-AK-CAZSC(3) 7,626.80 71.99 224.89 4,106.67 4,036.23 4,025.80 -3,820.77 5,961,886.53 345,349.89 0.29 5,539.89 MWD+IFR-AK-CAZ-SC(3) 7,720.69 71.99 22497 4,135.70 4,065.26 4,089.02 -3,683.83 5,961,824.60 345,285.58 0.08 5,628.85 MWD+IFR-AKCAZ-SC(3) 10/25201710:30:25AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: CDS-316 Norm Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey 10)2WO1710.30:25AM Page 5 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc AN TVD TVDSS +WS +EI -W Northing Easting DLS Section (usft) (1 P) (usft) (usft) (usfo (usft) (ft) Ift) (°11007 (ft) Survay, Tool Name 7,814.61 72.01 225.63 4,164.73 4,094.29 4,151.85 -3,947.32 5,961,763.06 345,220.85 0.67 5,717.79 MWD+IFR-AK-CAZ-SC(3) 7,907.63 72.02 226.60 4,193.51 4,123.07 4,213.31 4,011.22 5,961,70290 345,155.73 0.99 5,805.95 MWD+IFR-AK-CAZSC(3) 8,001.23 71.98 225.92 4,222.37 4,151.93 4,274.72 4,075.40 5,961,64279 345,090.34 0.69 5,894.25 MWD+IFR-AK-CAZSC(3) 8,095.52 71.84 225.57 4,251.65 4,181.21 4,337.27 4,139.60 5,961,581.55 345,024.90 0.38 5,983.42 MWD+IFR-AK-CAZ-SC(3) 8,190.64 71.52 225.34 4,281.55 4,211.11 4,400.61 4,20395 5,961,519.52 344959.29 0.41 6,073.31 MWD+IFR-AK.W-SC(3) 8,283.93 71.50 225.47 4,311.13 4,240.69 4,462.73 4,266.95 5,961,458.68 344,89506 0.13 6,161.40 MWD+IFR-AK-CAZSC(3) 8,378.39 71.47 226.52 4,341.13 4,270.69 4,524.96 4,331.38 5,961,397.77 344,829.40 1.05 6,250.47 MWD+IFR-AK-CAZSC(3) 8,472.86 71.44 22746 4,371.11 4,300.67 4,585.92 4,396.73 5,961,338.13 344,762.84 0.95 6,339.18 MWD+IFR-AK-CAZ-SC(3) 8,56636 71.41 227.16 4,401.12 4,330.68 4,646.46 4,462.37 5,981,278.92 344696.01 0.30 6,427.75 MWD+IFR-AK-CAZ-SC(3) 8,661.19 71.63 227.01 4,431.02 4,360.58 4,707.38 4,527.89 5,961,219.34 344,629.29 0.28 6,516.53 MWD+IFR-AK-CAZ-SC(3) 8,755.41 71.57 225.59 4,460.76 4,390.32 4,769.15 4,592.52 5,961,158.89 344,563.43 1.43 6,605.39 MWD+IFR-AK-CAZSC(3) 8,849.96 71.47 225.07 4,490.73 4,420.29 4,832.19 4,656.29 5,961,097.14 344,498.41 0.53 6,694.68 MWD+IFR-AK-CAZ-SC (3) 8,943.68 71.41 224.71 4,520.56 4,450.12 4,895.13 4,719.00 5,961,035.47 344,434.46 0.37 6,783.20 MWD+IFR-AK-CAZ-SC(3) 9,037.62 71.48 224.88 4,55046 4,480.02 4,958.33 4,78174 5,960,973.55 344,37046 0.19 6,871.95 MWD+IFR-AK-CAZ-SC(3) 9,131.63 71.47 225.66 4,580.33 4,509.89 5,02106 4,845.07 5,960,912.11 344,30589 0.79 6,960.71 MWD+IFR-AK-CAZSC(3) 9,226.41 71.54 226.20 4,610.39 4,539.95 5,083.58 4,909.65 5,960,850.90 344,24008 0.55 7,050.11 MWD+IFR-AK-CAZ-SC(3) 9,320.96 71.47 226.69 4,640.39 4,569.95 -5,145.37 4,974.63 5,960,790.44 344,173.87 0.50 7,139.21 MWD+IFR-AK-CAZ-SC(3) 9,416.14 71.54 227.20 4,670.58 4,600.14 -5,206.99 -5,040.59 5,960)30.16 344,106.70 0.51 7,228.81 MWD+IFR-AK-CAZ-SC(3) 9,509.75 71.54 226.36 4,70022 4,629.78 5,267.79 -5,105.29 5,960,670.67 344,040.79 0.85 7,316.98 MWD+1FR-AK-CAZ-SC(3) 9,604.30 71.47 226.05 4,730.21 4,659.77 5,329.85 5,170.02 5,960,60993 343,974.84 0.32 7,406.13 MWD+IFR-AK-CAZSC(3) 9,696.73 71.53 225.47 4,760.18 4,689.74 -5,392.33 -5,234.17 5,960,548.76 343,909.45 0.59 7,495.22 MWD+1FR-AK-CAZ-SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 -5,455.41 -5,297.76 5,960,486.97 343,844.61 048 7,58442 MWD+IFR-AK-CAZ-SC(3) 9,888.23 71.51 224.84 4,820.26 4,749.62 -5,519.25 -5,361.42 5,960,424.43 343,779.69 0.15 7,674.24 MW0+1FR-AK-CAZSC(3) 9,981.40 71.47 224.70 4,849.84 4,779.40 5,581.97 5,423.64 5,960,362.97 343,716.23 0.15 7,762.29 MWD+1FR-AK-CAZSC(3) 10,075.46 71.54 225.61 4,879.68 4,809.24 5,644.88 5,466.88 5,960,301.35 343,65174 0.92 7,851.13 MWD+IFR-AK-CAZ-SC(3) 10,169.70 71.48 22541 4,909.56 4,839.12 -5,707.51 5,550.64 5,960,240.02 343,586.74 021 7,940.09 MWD+IFR-AK-CAZ-SC(3) 10,261.84 71.54 225.24 4,938.79 4,868.35 -5,768.95 -5,61218 5,960,179.84 343,523.36 0.19 8,027.09 MWD+IFR-AK-CAZ-SC (3) 10,354.14 71.54 223.92 4,968.01 4,897.57 -5,831.31 -5,674.23 5,960,118]4 343,460.70 1.36 8,114.36 MWD+IFR-AK-CAZSC(3) 10,448.48 71.51 223.01 4,99791 4,927.47 5,896.25 5,7W.78 5,960,055.05 343,39786 0.92 8,203.68 MWD+IFR-AK-CAZ-SC(3) 10,542.93 71.44 223.34 5,027.92 4,957.48 -5,961.56 5,797.06 5,959,990.99 343,335.29 0.34 8,293.10 MWD+IFR-AK-CAZ-SC(3) 10,637.66 71.41 222.95 5,058.07 4,987.63 -6,027.08 -5,85847 5,959,926.71 343,272.58 0.39 8,38276 MWD+IFR-AK-CAZ-SC(3) 10,732.15 71.54 223.40 5,088.07 5,017.63 0,092.42 -5,919.78 5,959,862.62 343,209.97 0.46 8,472.23 MWD+IFR-AK-CA2-SC(3) 10,826.66 71.47 223.51 5,118.05 5,047.61 0,15749 5,981.42 5,959,798.81 343,147.04 0.13 8,561.69 MWD+IFR-AK-CAZSC(3) 10,920.49 71.51 224.37 5,147.84 5,077.40 0,221.55 5,043.16 5,959,736.00 343,064.03 0.87 8,650.46 MWD+IFR-AK-CAZ-SC(3) 11,015.80 71.57 225.09 5,178.02 5,107.58 0,285]8 0,106.79 5,959,673.07 343,019.13 0.72 8,740.55 MWD+IFR-AK-CAZ-SC(3) 11,110.71 71.54 225.23 5,208.05 5,137.61 0,349.27 0,170.63 5,959,610.88 342,964.04 0.14 8,830.22 MWD+IFR-AK-CA2-SC(3) 11,204.34 71.51 225,98 5,237.72 5,167.28 0,411.39 5.234.08 5,959,55005 342,88935 0.76 8,918.60 MWD+IFR.AK-CAZSC(3) 11,296.22 71.51 225.54 5,267.49 5,197.05 6,473.51 5,297.87 5,959,489.23 342,824.34 044 9,007.19 MWD+IFR-AK-CAZ-SC(3) 11,392.43 71.47 226.35 5,297.40 5,226.96 0,535.63 0,362.07 5,959,428.42 342,758.91 0.82 9,096.04 MWD+IFR-AK-CAZSC(3) 11,488.64 71.57 Uliel 5,327.26 5,256.82 5,597.04 0,426.97 5,959,368.32 342,69279 0.48 9,184.81 MWD+IFR-AKCAZSC(3) 10)2WO1710.30:25AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: CDS-316 North Reference: True Wellbore: CDS-316 Survey Calculation Method: Minimum Curvature Design: CDS-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc AN TVD TVDSS +WS +E/ -W Northing Easting DLS Section (usft) 0 P) (usft) (usfa (usft) (usft) (ft) (ft) ("/1001 (ft) Survey Tool Name 11,58191 71.51 225.71 5,357.24 5,286.60 0,659.13 5,491.85 5,959,307.56 342,62669 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11,675.56 7154 226.01 5,387.11 5,316.67 0,72140 5,556.01 5,959,24659 342,561.29 0.30 9,363.01 MWD+IFR-AK-CAZ-SC(3) 11,769.70 71.45 226.05 5,416.98 5,346.54 0,783.36 5,620.25 5,959,185.93 342,495.83 0.10 9,451.77 MWD+IFR-AK-CAZ-SC(3) 11,864.23 71.54 226.31 5,446.99 5,376.55 0,845.43 5,684.93 5,959,125.18 342,429.92 0.28 9,540.89 MWD+IFR-AK-CAZSC(3) 11,957.80 71.51 22567 5,47664 5,406.20 5,907.09 5,748.76 5,959,064.82 342,364.87 0.65 9,629.15 MWD+IFR-AK-CAZSC(3) 12,052.51 71.56 228.14 5,506.84 5,436.20 0,969.60 5,813.27 5,959,003.62 342,299.12 047 9,718.51 MWD+IFR-AK-CAZSC(3) 12,146.60 71.54 225.89 5,536.41 5,465.97 -7,031.59 5,8]].49 5,958,94294 342,23367 0,25 9,807.27 MWD+IFR-AKCAZSC(3) 12,241.51 71.53 225.34 5,566.47 5,496.03 -7,094.55 0,941.83 5,958,881.28 342,168,09 0.55 9,896.87 MWD+IFR-AK-CAZ-SC (3) 12,335.11 71.57 225.41 5,596.10 5,52566 4,158.93 -7,005.02 5,958,820.20 342,103.66 0.08 9,985.26 MWD+1FR-AK-CAZ-SC(3) 12,429.97 71.56 22527 5,626.09 5,555.65 -7,220.18 -7,069.03 5,958,758.25 342,038.40 0.14 10,074.87 MWD+IFR-AK-CAZSC(3) 12,523.83 7147 224,14 5,655.85 5,585.41 -7,283.45 -7,131.65 5,958,69625 341,974.52 1.15 10,163.58 MWD+IFR-AKCAZSC(3) 12,618.97 71.51 224.02 5,686.06 5,615.62 -7,348.26 -7,194.41 5,958,63212 341,910.48 0.13 10,253.57 MWD+IFR-AK-CAZ-SC(3) 12,711.50 7154 224.33 5,715.38 5,644.94 -7,411.20 -7,255.57 5,958,571.02 341,848.08 0.32 10,341.10 MWD+IFR-AK-CAZ-SC(3) 12,806.89 7165 224.34 5,745.50 5,675.06 -7,475.94 -7,318,82 5,958,507.57 341,783.54 0.12 10,431.35 MWD+IFR-AK-CAZ-SC(3) 12,901.29 72.05 224.84 5,774.90 5,704.46 -7,539.82 -7,381+80 5,958,444.97 341,719.30 066 10,520.77 MWD+IFR-AK-CAZ-SC(3) 12,995.80 71.98 224.41 5,804,09 5,733.65 .7,603.80 -7,444.94 5,958,382.28 341,654.89 0.44 10,610.36 MWD+IFR-AK-CAZSC(3) 13,090.91 71.99 224.79 5,833.50 5,763.06 -7,668.20 -7,506.45 5,958,319.17 341,590.11 0.38 10,700.52 MWD+IFR-AK-CAZSC(3) 13,184,41 71.93 224.60 5,862.45 5,792.01 -7,731.40 -7,570.98 5,958,257.25 341,526.33 0.20 10,789.13 MWD+IFR-AK-CAZ-SC(3) 13,279.48 71.90 224.71 5,891.97 5,821.53 -7.795.68 4,634,50 5,958,194.25 341,461.53 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,373.83 72.04 22841 5,921.17 5,850.73 -7,659.06 -7,698.00 5,958,132.17 341,396.77 0.72 10,968.57 MWD+IFR-AK-CAZ-SC(3) 13,468.20 71.50 22544 5,950.69 5,880.25 -7,921.97 -7,761.85 5,958,070.56 341,33168 0.57 11,057.80 MWD+IFR-AK-CAZ-SC(3) 13,562.30 71.51 226.89 5,980.54 5,910.10 -7,983.77 -7,828.22 5,958,010.07 341,266.09 1.46 11,146.52 MWD+IFR-AK-CAZSC(3) 13,656.37 7147 226.33 6,010.41 5,939.97 0,045.05 -7,891,04 5,957,950.11 341,200.05 0.57 11,235.13 MWD+IFR-AKCAZSC(3) 13,750,15 71.45 227.14 6,40.23 5,969.79 0,105.99 -7,955.79 5,957,890.49 341,134.10 0,82 11,323.43 MWD+1FR-AKCAZ-SC (3) 13,800.59 71.44 226.74 6,056.28 5,985.84 0,138.63 -7,990.73 5,957,858.55 341,098.52 0.75 11,370.90 MWD+IFR-AW0AZ-SC(3) 13,83800 71.58 22262 6,068.14 5,997]0 -8,162.75 -8,016.75 5,957,834,96 341,072.02 2.25 11,406.10 NOT an Actual Survey 9 alb" x 12.1/4" 13,873.32 7172 228.44 6,079.26 6,008.82 0,185.17 5,04167 5,957,813.05 341,046.65 225 11,439.29 MWD+IFR-AK-CAZSC(4) 13,935.17 71.38 227.82 6,096.84 6,028.40 5,224.33 5,085.36 5,957,774.78 341,002.19 1.10 11,497.37 MWD+IFR-AKCAZ-SC (5) 14,026.93 71.94 226.80 6,127.71 6,057.27 5,283.39 5,149.38 5,957,717.02 340,937.00 1.22 11,583.76 MWD+IFR-AK-CAZ-SC (5) 14,121.92 69.01 225.10 6,159,46 6,089.02 -8,345.61 5,213.73 5,957,656.10 340,871.42 3.52 11,672.79 MWD+IFR-AK-CAZ-60(5) 14,216.96 66.32 224.82 8,195.57 6,125.13 -8,407.81 5,275.64 5,957,595.17 340,808.06 2.84 11,760.37 MWD+IFR-AK-CAZ-SC(5) 14,310.62 66.61 225.14 6,232.97 6,162.53 0,466.55 5,336.54 5,957,535.67 340,746.18 0.44 11,845.91 MWD+IFR-AKCAZ-SC(5) 14,403.99 67.62 224.42 6,269.28 8,198.84 5,529.61 5,397.13 5,957,475.84 340,684.38 1.29 11.931.63 MWD+IFR-AKCAZ-SC(5) 14,498.53 68.91 223.72 6,304.29 6,233.85 -8,592.71 -8,458.20 5,957,413.99 340,62205 1.53 12,019.22 MWD+IFR-AK-CAZ-SC(5) 14,593.03 7023 222.21 6,337.28 6,266.84 5,657.51 -8,518.55 5,957,350.41 340560.42 2.05 12,107.65 MWD+IFR-AK-CAZ-SC(5) 14,686.36 71.31 221+48 6,368.01 6,297.57 5,723.16 5,577.34 5,957,265.97 340500.33 1.37 12,195.73 MWD+IFR-AK-CAZ-SC(5) 14,781.88 72,16 220.76 6,397.95 6,327.51 5,791.49 0,636.99 5,957,218.85 340,439.33 1.14 12,286.42 MWD+IFR-AKCAZSC (5) 14,87841 72.70 218.95 6,426.49 6,356.05 5,860.67 5,694.74 5,957,150.85 340,38021 1.91 12,376.54 MWD+IFR-AKCAZSC(5) 14,970.91 72.99 217.02 6,454.3] 6,383.93 5,931.83 5,750.31 5,957,080.82 340,323.22 1.98 12,466.77 MWD+IFR-AKCAZ-SC (5) 10252017 10:30:25AM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-316 project Western North Slope TVD Reference: CD5316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: C135-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method; Minimum Curvature Design: CDS-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc AN No TVDSS +WS +El -W Northing Easting DLS Section (usfU 11 (") Nam (usft) (usfq (usft) (ft) (ft) 1711001) (ft) Survey Tool Name 15,065.09 73.36 216.45 6.48163 6,411.19 -9,004.08 -8,80422 5,957,00967 340,267.87 070 12,556.77 MWD+IFR-AK-CAZ-SC(5) 15,159.35 73.29 216.91 6,508.67 6,438.23 -9,078.50 .8,858.16 5,956,938.36 340,212.49 0.47 12,646.92 MWD+1FR-AK-CAZ-SC (5) 15,253.47 73.04 216.00 6,535.93 6,465.49 -9,148.95 .8.911 69 5,956,867.00 340,157.53 0.96 12)36.83 MWD+IFR-AK-CAZ-SC(5) 15,346.75 73.27 215.61 6,562.96 6,492.52 -9,221.35 -8,963.92 5,956,79566 340,103.86 0.47 12,825.67 MWD+IFR-AK-CAZ-SC(5) 15,441.51 73.17 215.50 6,59032 6,519.88 -9,295.17 -9,01668 5,956,722.93 340,049.63 0.15 12,916.32 MWD+IFR-AK-CAZ-SC(5) 15,535.88 73.17 216.07 6,617.64 6,547.20 -9,358.44 -9,069.49 5,956,65074 339,99536 0.58 13,006.40 MWD+IFR-AK-CAZ-SC(5) 15,631.21 73.56 217.00 6,644.93 6,574.49 -9,441.83 -9,123.87 5,956,578.46 339,939.52 1.02 13,097.57 MWD+IFR-AK-CAZ-SC(5) 15,725.01 73.75 217.47 6,671.33 6,600.89 -9,513.49 -9,178.33 5,956,50791 339,883.64 0.52 13,187,48 MWD+IFR-AK-CAZ-SC(5) 15,819.26 73.74 217.75 6,69771 6,627.27 -9,585.17 -9,233.55 5,956,437.36 339,826.99 029 13,277.88 MWD+IFR-AK-CAZSC(5) 15,91287 7580 217.16 6,723.82 6,653.38 -9,656.36 -9,288.11 5,956,367.29 339,77193 0.59 13,367.48 MWD+IFR-AK-CAZ-SC(5) 16,007.80 73.70 217.42 6,750.44 6,68000 .9,729.01 -9,343.45 5,956,295.77 339,71424 0.26 13,458.71 MWDNFR-AK-CAZ-SC(5) 16,100.93 7387 216.11 6,776.45 6,706.01 -9,799.70 -9,398.22 5,956,226.20 339,658.07 0.73 13,548.07 MWD+1FR-AK-CAZ-SC(5) 16,195.75 73.29 219.27 6,803.25 6,732.81 -9,87069 -9,455.07 5,956,156.36 339,599.81 1.32 13,638.99 MWD+IFR-AK-CAZ-SC(5) 16,289.36 73.20 219.43 6,830.24 6,759.80 -9,940.01 -9,511.90 5,956086.21 339,541.60 0.19 13,728.62 MWD+IFR-AK-CAZSC(6) 16,383.76 73.38 219.47 6,857.38 6,788.94 -10,009.82 -9,569.35 5,956,019.57 339,482.76 0.19 13,819.03 MWD+IFR-AK-CAZ-SC (5) 16,47].94 7339 21924 6,884.31 6,81387 -10,079.61 -9,626.58 5,955,950.95 339,424.15 0.23 13,909.27 MWD+IFR-AK-CAZ-SC(5) 16,572.84 73.08 219.74 6,911.68 6,84124 -10,149.73 -9,684.37 5,955,88291 339,364.97 0.60 14,000.14 MWD+1FR-AK-CAZ-SC(5) 16,665.89 73.11 219.02 6,938.74 6,868.30 -10,218.55 -9,740.85 5,955,81435 339,37.12 0.74 14,089.16 MWD+IFR-AK-CAZSC(5) 16,760.99 73.39 218.54 6,966.15 6,895.71 -10,289.54 -9,797.89 5,955,744.52 339,248.67 0.57 14,180.20 MWD+IFR-AKCAZSC(5) 16,855.21 73.23 218.22 6,993.21 6,922.77 .10,360.28 -9,853.92 5,955,674.92 339,19123 0.37 14,270.42 MWD+IFR-AKCAZ-SC (5) 16,W&W 73.33 218.08 7,020.18 6,949.74 -10,430.90 -9,909.39 5,955,60543 339,134.36 0.18 14,350.17 MWD+IFR-AK-CAZ-SC(5) 17,041.35 7286 217.88 7,047.05 6,976.61 -10,500.57 -9,963]8 5,955,536.68 339,78.59 0.55 14,448.50 MWD+1FR-AK-CAZ-SC(5) 17,137.34 73.18 217.67 7,075.08 7.004.84 -10,573.13 -10,020.02 5,955,465.46 339,020.91 0.39 14,540.24 MWD+1FR-AK-CAZSC(5) 17,233.57 72.96 217.32 7,103.10 7,032.66 -10,646.17 -10,076.06 5,955,393.57 338,963.42 0.42 14,632.21 MWD+IFR-AKCAZ-SC(5) 17,327.48 73.10 216.26 7,130.51 7,670.07 -10,718.11 -10,129.85 5,955,322.73 338,908.20 1.09 14,721.89 MWD+IFR-AKCAZ-SC(5) 17,421.19 7383 21460 7,157.18 7,086.74 -10,791.30 -10,181.92 5,955,250.60 338,854.67 1.67 14,81143 MWD+IFR-AKCAZ-SC(5) 17,516.62 7440 213.75 7,183.30 7,112.86 -10,867.24 -10,23348 5,955,17572 338,801.61 1.04 14,902.74 MWD+IFR-AK-CAZ-SC(5) 17,611.14 74.84 211.54 7,208.37 7,137.93 -10,943.97 -10,282.63 5,955,100.00 338,750.92 2.30 14,993.12 MWD+IFR-AK-CAZSC(5) 17,703.91 75.03 209.96 7,232.49 7,162.05 -11,020.96 -10,328.43 5,955,023.95 338,703.59 1.66 15,061.53 MWD+IFR-AKCAZSC(5) 17,799.38 76.47 20723 7,255.99 7,185.55 -11,102.20 -10,372.71 5,954,943.63 338,65770 3.16 15,172.22 MWD+IFR-AKCAZ-SC(5) 17,893.13 77.03 205.26 7,277.48 7,207.04 -11,184.04 -10,413.06 5,954662.61 338,615.71 2.13 15,260.86 MWD+IFR-AK-CAZ-SC(5) 17,987.45 76.73 202.66 7,298.89 7,228.45 -11,267.91 -10,450.51 5,954,779.52 338,576.59 2.50 15,349.18 MWD+IFR-AK-CAZSC(5) 18,080.82 77.68 199.48 7,319.58 7,249.14 -11,352.80 -10,483.38 5,954,695.31 338,542.03 3.67 15,435.34 MWD+IFR-AKCAZ-SC(5) 18,175.32 79.44 196.22 7,33833 7,267.89 -11,440.95 -10,51176 5,954,607.75 338,511.89 3.86 15,521.11 MWD+IFR-AKCAZ-SC(5) 18,270.13 81.03 194.25 7,354.41 7,283.97 -11,531.10 -10,536.30 5,954,518.12 338,485.54 2.65 15,605.94 MWD+IFR-AK-CAZ-SC(5) 18,364.77 80.83 190.70 7,369.33 7,298.89 -11,622.33 -10,556.49 5,954,427.32 338,463.52 3.71 15,688.81 MWD+1FR-AK-CA2SC(6) 18,459.13 82.07 168.59 7,383.36 7,312.92 -11,714.32 -10,572.12 5,954,335.67 338,446.05 2.57 15,769.32 MWD+IFR.AKCAZ-SC(5) 18,55286 83.26 186.04 7,395.33 7,324.89 -11,806.52 -10,58395 6,954,243.74 338,43237 2.98 15,847.55 MWD+IFR-AKCAZ-SC(6) 18,647.30 84.21 184.51 7,405.64 7,335.20 -11,899.99 -10,592.58 5,954,15046 338,421.87 1.90 15,924.70 MWD+IFR-AK-CAZ-SC(5) 18,741.74 84.69 181.77 7,414.77 7,344.33 -11,99384 -10,597.73 5,954,0%,75 338,414.84 2.93 15,999.90 MWD+1FR-AK-CAZ-SC(5) 10252017 10:30:25AM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project• Western North Slope 7VD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CDS-316 North Reference: True Wellbore: CDS-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/•W Northing Basting DLS Section (usft) P) P) (usft) (usft) (usfq (usft) (ft) (ft) (°11801 (ft) Survey Tod Name 18,836.06 86.48 179.80 7,422.03 7,351.59 -12,087.88 .10,599.02 5,953,96276 338,411.66 2.82 16,072.77 MWD+IFR-AK-CAZSC(5) 18,930.56 87.55 178.12 7,426.95 7,356.51 -12,182.21 -10,597.30 6,953,868.42 338,411.48 2.11 16,143.93 MWD+IFR-AK-CAZ-SC(6) 19,025.04 87.30 174.91 7,431.20 7,360.76 -12,276.41 -10,591.57 5,953,774.13 338,415.33 3.40 16,212.40 MWD+IFR-AK-CAZ-SC(5) 19,118.90 8]06 171.35 7,43582 7,365.38 -12,369.47 -10,560.35 5,953,680.87 338,424.67 3.80 16,276.48 MWD+IFR-AK-CAZ-SC(5) 19,213.16 87.12 168,06 7,440.61 7,370.17 -12,462.08 -10,563.53 5,953,587.95 338,439.62 3.49 16,336.61 MWD+IFR-AK-CAZ-SC(5) 19,278.96 87.78 168.93 7,443.53 7,373.09 -12,526.49 -10,55042 5,953,52329 338,45144 1.66 16,377.53 MW0+1FR-AK-CAZ-SC(5) 19,333.00 a7.56 168.86 7,445.73 7,375.29 -12,579.48 -10,540.02 5,953,470.11 338,460.77 0.42 16,411.43 NOT eR ACga($UryBy 7" z 8.718" 19,341.54 87.53 168.85 7,446.09 7,375.65 -12,58.85 -10,538.37 5,953,461.71 338,46225 0.42 16416.79 MWD+IFR-AK-CAZSC(6) 19,388.28 88.27 169.59 7,447.81 7,377.37 -12,633.73 -10,529.64 5,953,415.66 338,470.07 2.24 16,448.32 MWD+IFR-AK-CAZ-SC(6) 19,482.79 90.65 167.21 7,44810 7,378.26 -12,726.29 -10,510.64 5,953,322.75 338,487.20 3.56 16,505.01 MWD+IFR-AK-CAZ-SC(6) 19,577.66 91.23 168.57 7,447.14 7,376.70 -12,819.04 -10,490.74 5,953,229.63 338,50523 1.56 16,563.27 MWD+1FR-AK-CAZ-SC(6) 19,672.69 91.97 171.35 7,444.49 7,374.05 -12,912.56 -10,474.18 5,953,135.79 338,519.91 3.03 16,624.27 MWD+IFR-AK-CAZ-SC(6) 19,767.99 91.32 17480 7,441.75 7,371.31 -13,007.12 -10.462.69 5,953,041.04 338,52949 3.68 16,689.32 MWD+IFR-AK-CAZ-SC(6) 19,863.00 9168 175.86 7439.26 7,368.82 -13,101.78 -10,454.96 5,952,946.25 338,535.32 1.18 16,756.86 MWD+1FR-AK-CA2-SC(6) 19,958.18 92.12 179.08 7,436.11 7,365.67 43,196.80 -10,45016 5,952,851.17 338,537,61 3.41 16,826.95 MWD+IFR-AK-CAZ-SC(6) 20,053.61 93.17 179.65 7,431.70 7,361.26 -13,292.12 .10,44971 5,952,755.85 338,536.76 1.25 16,699.30 MWD+1FR-AK-CAZSC(6) 20,148.66 93.29 17840 7,426.35 7,355.91 -13,387.00 -10,448.09 5,952,660.96 338,536.47 1.32 16,970.94 MWD+IFR-AK-CAZSC(6) 20,244.02 91.22 17762 7,422.59 7,352.15 -13,482.21 -10,444.28 5,952,565.71 338,538.36 2.61 17,041.42 MWD+1FR-AK-CAZ-SC(6) 20,340.24 90.06 175.86 7,421.52 7,351.08 -13,578.23 -10,438.31 5,952,469.59 338,54241 1.70 17,111.14 MWD+IFR-AK-CAZ-SC(6) 20,434.51 89.24 171.59 7,422.10 7,351.66 -13,671.91 -10,428.01 5,952,375.73 338,55082 4.61 17,176.29 MWD+IFR-AK-CAZ-SC(6) 20,529.42 9147 17293 7,421.51 7,351.07 -13,765.95 -10,415.23 5,952,281.46 338,561.71 2.74 17,240.11 MWD+1FR-AK-CAZ-SC(6) 20,625.33 91.51 173.16 7,419.01 7,348.57 -13,661.12 -10,403.62 5,952,186.08 338,571.41 024 17,305.55 MWD+IFR.AK-CAZSC(6) 20,720.36 91.61 171,62 7,416.43 7,345.99 -13,955.27 -10,39164 5,952,09110 338,582.10 162 17,369.59 MWD+IFR-AK-CAZ-SC (6) 20,815.63 68.03 169.43 7,416.73 7,346.29 -14,049.22 -10,37536 5,951,98.46 338,595.88 4.40 17,431.48 MW0+1FR-AK-CAZSC(6) 20,911.42 88.06 169.76 7,419.99 7,349.55 -14,143.38 -10,358.07 5,951,902.98 338,611.28 0.35 17,492.50 MWD+IFR-AK-CAZSC(6) 21,006.60 89.17 173.46 7,422.30 7,351.86 -14,237.50 -10,344.19 5,951,808.61 338,623.27 466 17,555.67 MWDNFR-AK-CAZSC(6) 21,10240 90.56 173.87 7,422.52 7,352.08 -14,332.71 -10,333.62 5,951,713.22 338,631.92 1.51 17,621.81 MWD+IFR-AK-CAZ-SC(6) 21,197.44 87.65 173.63 7,42461 7,353.57 -14,427.16 -10,32327 5,951,618.58 338,640.37 3.07 17,687.52 MWD+IFR-AK-CAZ-SC(6) 21,292.22 88.32 171.23 7,42].34 7,356.90 -14,521.05 -10,310.80 5,951,524.47 338,650.96 2.63 17,75142 MWD+IFR-AK-CAZ-SC(6) 21,388.07 8968 171.50 7,429.51 7,359.07 -14,615.79 -10,296.41 5,951,42947 338,663.44 0.84 17,814.75 MWD+IFR-AK-CAZ-SC(6) 21,483.22 88.71 171.18 7,431.35 7,360.91 -14,70984 -10,28208 5,951,335.16 338,675.87 0.51 17,877.59 MWD+IFR-AK-CAZ-SC(6) 21,578.21 89.91 172.53 7,432.49 7,362.05 -14,80388 -10,268.63 5,951,240.89 338,687.44 1.90 17,940.96 MWD+IFR-AK-CAZSC(6) 21,673.71 89.47 173.85 7,433.01 7,362.57 -14,898.68 -10,257.30 5,951,145.87 330,696.85 1.46 18,008.32 MWD+IFR-AK-CAZSC(6) 21,769.53 90.08 175.74 7,433.39 7,362.95 -14,994.10 -10,24881 5,951,050.30 338,70363 2.07 18,073.83 MWD+IFR-AK-CAZ-SC(6) 21,864.76 89.51 178.50 7,433.73 7,363.29 -15,089.22 -10,243.83 5,950,855.11 338,706.50 2.96 18,143.62 MWD+1FR-AK-CAZ-SC(6) 21,959.40 89.24 179.24 7,434.76 7,364.32 -15,183.82 -10,241.96 5,950,860.51 338,706.47 0.83 18,214.88 MWD+IFR-AK-CAZ-SC(6) 22,053.07 86.77 177.04 7,438.02 7,367.58 -15,277.37 -10,23892 5,950,76692 338,707.62 3.53 18,284.60 MWD+IFR-AK-CAZ-SC(6) 22,149.39 89.75 17804 7,440.94 7,370.50 -15,373.54 -10,234]9 5,950,670.89 338,709.82 3.26 18,355.61 MWD+IFR-AK-CAZ-SC(6) 22,245.79 89.94 176.93 7,441.20 7,370.76 -15,469.85 -10,230.56 5,950574.32 336712.12 1.17 18,426.67 MWD+1FR-AK-CAZSC(6) 102W01710:30:25AM Page 8 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report company: NADConversion Local Coordinate Reference: Well CD5-316 Project Western North Slope TVD Reference: CD5-316 actual Q 70.44usft (Doyon 19) sfte: CDS Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CDS-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Surrey 22,816.22 89.49 170.89 7,44049 7,370.05 -16,031,30 -10,135.35 Map Map 22,910.94 MD Inc Azi TVD TVDSS +NIS +EI -W Northing Easting DLS (usft) 1`I 11 (usft) (usft) (unto Wait) (R( Ift) (•1100•) 22,339.49 89.57 17521 7,44161 7,371.17 -15,563.32 -10,224.14 5,950,480.75 338,716.86 1.68 22,435.60 90.25 17121 7,441.76 7,371.32 -15,658.74 -10,212.78 5,950,385.13 338,726.10 4.22 22,529.38 90.13 167.67 7,441.45 7,371.01 -15,750.91 -10,195.60 5,950,292.63 338,74143 3.78 22,624.26 90.34 166.72 7,441.06 7,370.62 -15,843.43 -10,17457 5,950,199.72 338,76060 1.03 22,721.44 90.42 167.64 7,44041 7,369.97 -15,938.19 -10,153.01 5,950,104.% 338,780.25 0.95 22,816.22 89.49 170.89 7,44049 7,370.05 -16,031,30 -10,135.35 5,950,011.12 338,796.03 22,910.94 90.33 173.25 7,440.63 7,370.19 46,125.10 -10,122.29 5,949,91]08 338,8D]21 23,006.09 8965 172.49 7,440.65 7,370.21 -16,219.51 -10,110.48 5,949,82245 338,817.12 23,101.43 89.07 173.06 7,441]2 7,371.28 -16,314.09 -10,098.49 5,949,727.66 338,827.21 23,196.49 88.58 174.47 7,443.67 7,373.23 .16,408.57 -10,088.17 5,949,633.01 338,835.63 23,291.44 8868 177.08 7,445.94 7,375.50 -16,503.22 -10,081.17 5,949,538.23 338,840.72 23,336.41 8926 176.30 7,446.74 7,376.30 -16,548.11 -10,07658 5,949,493.31 338,842.42 23,355.49 88.61 175.46 7,447.12 7,37668 -16,568.13 -10,077.13 5,949,473.26 338,893.46 23,452.90 8908 177.59 7,449.06 7,378.62 -16,664.34 -10,071.29 5,949,376.% 338,847.37 23,547.17 84.37 174.87 7,454.45 7,384.01 -16.758.22 -10,065.11 5,949,28299 338,85166 23,643.19 8827 170.36 7,460.61 7,390.17 -16,853.20 -10,052.79 5,949,187.78 338,962.07 23,737.57 89.83 165.78 7,462.16 7,391.74 -16,945.50 -10,033.29 5,949,095.11 338,879.71 23,833.02 90,91 161.37 7,461.56 7,391.12 -17,037.03 -10,006.31 5,949,003.07 338,904.85 23,927.43 90.01 160.43 7,460.80 7,390.36 -17,126.24 -9,975.42 5,948,913.27 338,933.94 24,022.35 88.22 157.15 7,462.27 7,391.83 -17,214.70 -9,94199 5,948,824.14 338,966.49 24,117.76 88.28 158.20 7,465.18 7,394.74 -17,302.92 -9,904.86 5,948,735.22 339,000.93 24,213.06 88.22 161.54 7,468.09 7,397.65 -17,392.34 -9,87209 5,948,845.16 339,031.90 24,308.88 89.72 164.30 7,469.82 7,399.38 -17,483.89 -9,843.96 5,90$553.07 339,058.19 24,404.05 93.12 167.51 7,467.46 7,39]02 -17,576.16 -9,820.79 5,948,460.36 339,079.50 24,498.93 93.15 171.13 7,462.27 7,391.83 -17,669.24 -9,803.23 5,948,366.95 339,095.18 24,594.58 93.00 174.70 7,457.13 7,386.69 -17,760.01 -9,79145 5,948,271,98 339,105.05 24,690.27 91.00 176.36 7,453.79 7,383.35 -17,859.34 -9,784.00 5,948,176.52 339,110.59 24,784.60 90.69 177.76 7,452.40 7,381.96 -17,953.54 -9,779.16 5,948,08226 339,113.53 24,880.30 89.56 176.18 7,452.19 7,381.75 -18,049.10 -9,774.11 5,947,986.62 339,116.67 24,975.27 89.96 179.18 7,452.59 7,382.15 -18,143.98 -9.770.26 5,907,891.69 339,118.61 25,070.58 90.21 183.35 7,452.45 7,38201 -18,239.25 -9,772.37 5,947,796.49 339,114.59 25,165.14 90.26 179.52 7,45206 7,381.82 -18,333.76 -9,774.73 5,947,702.05 339,110.33 25,26123 88.21 172.23 7,453.35 7,382.91 -18,429.52 -9,767.83 5,947,606.18 339,115.31 25,356.13 91.18 166.13 7,453.85 7,383.41 -18,522.68 -9,750.02 5,947,512.69 339,131.24 25,451.31 90.12 161.35 7,452.77 7,382.33 -18,614.02 4),723.38 5,947,420.84 339,15804 25,547.01 89.87 163.22 7,45238 7,382.34 -18,705.17 -9,694.26 5,947,329.12 339,183.32 25,641.96 90.65 166.56 7,452.35 7,381.91 -18,796.83 -9,669.52 5,947,237.00 339,206.22 25,737.69 WAS 170.96 7,450.82 7,380.38 -18,890.88 -9,650.83 5,947,142.60 339,22302 25,832.49 90.36 168.73 7,449.55 7,379.11 -18,983.98 -9,634.15 5,947,049.18 339,237.82 25,928.27 90.00 169.53 7,449.24 7,378.80 -19,078.04 -9,616.09 5,946,954.79 339,253.99 3.57 2.64 1.07 0.85 1.57 2.75 2.16 5.29 2.26 5.77 Vertical Section (ft) Survey Tool Name 18,494.15 MWD+IFR-AK-CAZ-SC(6) 18,559.94 MWD+IFR-AK-CAZ-SC(6) 18,619.50 MWD+IFR-AK-CAZ-SC(6) 18,676.86 MWD+IFR-AK-CAZ-$C(6) 18,735.59 MWD+IFR-AK-CAZ-$C(6) 18,795.56 MWD+IFR-AK-CAZSC (6) 18,859.03 MWD+IFR-AK-CAZSC(6) 18,923.76 MWD+IFR-AK-CAZSC(6) 18,988.50 MWD+IFR-AK-CAZ-SC(6) 19,054.24 MWD+IFR-AK-CAZ-SC(6) 19,122.26 MWD+IFR-AK-CAZ-SC(6) 19,164.97 MWD+IFR-AK-CAZ-SC(6) 19,169.38 MW0+IFR-AK-CAZ-SC(7) 19,239.33 MWD+IFR-AK-CAZ-SC(7) 19,307.27 MWD+IFR-AK-CAZSC(7) 6.20 19,372.11 MWD+IFR-AK-CAZSC(7) 5.13 19,430.28 MWD+IFR-AK-CAZSC(7) 4.76 19,483.06 MWD+IFR-AK-CAZSC(7) 1.38 19,531.54 MWD+IFR-AK-CAZSC(7) 3.94 19,577.24 MWD+IFR-AK-CAZ-SC(7) 1.10 19,621.53 MWD+IFR-AK-CAZ-SC(7) 3.50 19,668.96 MWD+IFR-AK-CAZ-SC(7) 3.28 19,721.01 MWD+IFR-AK-CAZ-SC(7) 4.91 19,776.80 MWD+IFR-AK-CAZSC(7) 3.81 19,836.82 MWD+IFR-AK-CAZSC(7) 3,73 19,901.85 MWDNFR-AK-CAZSC(7) 2.72 19,970.09 MWD+IFR-AK-CAZSC(7) 1.52 20,039.13 MWD+IFR-AK-CAZSC(7) 2.03 20,109.09 MWD+IFR-AK-CAZ-SC(7) 3.19 20,179.30 MWD+IFR-AK-CAZ-SC(7) 4.38 20,253.63 MWD+IFR-AK-CAZ-$C(7) 4.05 20,327.55 MWD+IFR-AK-CAZSC(7) 7.88 20,396.47 MWD+IFR-AKCAZSC(7) 7.15 20,456.39 MWD+IFR-AK-CA2SC(7) 5.14 20,509.23 MWD+IFR-AK-CAZSC(7) 1.97 20,560.35 MWD+IFR-AK-CAZSC(7) 3.61 20,61465 MWD+IFR-AK-CAZSC(7) 4.82 20,674.69 MWD+IFR-AK-CAZ-SC(7) 2.51 20,735.29 MWD+IFR-AK-CAZ-SC(7) 0.92 20,795.73 MWD+IFR-AKCAZSC(7) 10252017 10.30:25AM Page 9 COMPASS 500014 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @170.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: COS -316 Survey Calculation Method: Minimum Curvature Design: CDS-316 Database: OAKEDMP2 Survey O Sudace Coordinates O Declination & Convergence E] GRS Survey Corrections Survey at 13,873.32 is a BHI Survey Co Survey Tool Codes Brandon Temple Digitally signed by Brandon Temple SLB DE Y Map Map Weifen Dai Vertical MD Inc An TVD TVDSS +W -S +El -W Northing Easting DLS Section (usft) (*) (1) (usft) (usf0 (weft) (usft) (ft) (ft) (^11001) (R) Survey Tool Name 26,023.18 91.55 170.14 7,44796 7,377.52 -19,171.45 -9,599.34 5,946,861.07 339,268.86 1.76 20,856.52 MWD+IFR-AK-CAZ-SC(7) 26,118.97 91.68 173.07 744526 7,374.82 -19,266.17 -9,585.36 5,946,766.10 339,280.93 3.06 20,920.09 MWD+IFR-AK-CAZ-SC(7) 26,214.57 89.39 172.22 7,444.37 7,373.93 -19,360.97 -9,573.12 5,946,671.08 339,291.26 2.56 20,964.85 MWD+IFR-AK-CAZ-SC(7) 26,309.49 88.74 175.71 7,445.92 7,375.48 -19,455.34 -9,663.15 5,946,576.54 339,299.34 3.74 21,050.72 MWD+IFR-AK-CAZSC(7) 26,405.32 88.92 179.71 7,44].87 7,377.43 -19,551.05 -9,559.32 5,946,480.77 339,301.24 4.18 21,121.59 MWD+IFR-AK-CAZSC(7) 26,499.28 89.29 181.69 7,449.34 7,378.90 -19,644.99 -9,560.47 5,946,386.88 339,29821 2.14 21,194.28 MWD+IFR-AK-CAZSC(7) 26,595.41 90.80 180.49 7,449.27 7,378.83 -19,741.10 -9,562.30 5,946,290.84 339,294.45 2.01 21,269.08 MWD+IFR-AK-CAZSC(7) 26,690.77 90.69 180.31 7,448.03 7,377.59 -19,836.44 -9,562.96 5,946,195.53 339,291.87 022 21,342.55 MWD+IFR-AK-CAZ-SC(7) 26,786.18 89.82 183.66 7,447.60 7,377.16 -19,931.78 -9,566.27 5,946,100.28 339,286.66 3.63 21,417.71 MWD+IFR-AK-CAZ-SC;(7) 26,881.10 89.29 184.73 7,448.34 7,377.90 -20,026.44 -9,573.21 5,946,00579 339,277.81 1.26 21,49469 MWD+IFR-AK-CAZSC(7) 26,975.97 90.05 179.59 7,448.89 7,37845 -20,121.21 -9,576.78 5,945,911,12 339,272.34 5.48 21,569.58 MWD+IFR-AK-CAZSC(7) 27,070.93 88.81 176.22 7,449.83 7,379.39 -20,216.09 -9,573.31 5,945,816.20 339,27390 3.78 21.640.03 MWD+IFR-AK-CAZSC(7) 27,166.60 88.74 179.05 7,451.88 7,381.44 -20,311.84 -9,569.36 5,945,720.39 339,275.93 2.95 21,710.84 MWD+IFR-AK-CAZ-SC(7) 27,262.51 87.99 177.09 7,454.61 7,384.17 -20,40.46 -9,58844 5,945,624.74 339,27724 2.19 21782.01 MWD+IFR-AK-CAZ-SC(7) 27,357.49 88.38 174.94 7,457.62 7,387.18 -20,502.15 -9,559.54 5,945,529.93 339,281.93 2.30 21,850.31 MWD+IFR-AK-CAZ-SC(7) 27,452.40 86.58 171.42 7,46180 7,391.36 -20,596.26 .9,548.28 5,945,435.61 339,291.29 4.16 21,915.19 MWD+IFR-AK-CAZ-SC(7) 27,547.54 88.11 167.00 7,486.20 7,395.76 -20,68961 -9,530.49 5,945,341.94 339,307.20 4.91 21,975.25 MWD+IFR-AK-CAZ-SC(7) 27,643.36 89.40 163.50 7,468.29 7,397.85 -20,762.24 -9,506.11 5,945,248.86 339,329.72 3.89 22,030.53 MWD+IFR-AK-CAZSC(7) 27,738.41 88.99 165.86 7,469.62 7,399.18 -20,87389 -9,481.00 5,945,156.72 339,352.99 2.52 22,084.60 MWD+IFR-AK-CAZSC(7) 27,778.03 88.99 165.86 7,470.32 7,399.88 -20,912.28 -9,471.33 5,945,118.15 339,361.88 0.00 22,107.79 NOT an Aelual Survey 4-112" X 6574" 27,798.00 88.99 165.66 7,470.67 7,400.23 -20,931.67 -9,46644 5,945,09867 339,366.38 0.00 22,119.50 PROJECTED to TO rinal Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. El Yes ❑ No I have checked to the best of my ability that the following data is correct O Sudace Coordinates O Declination & Convergence E] GRS Survey Corrections Survey at 13,873.32 is a BHI Survey Co Survey Tool Codes Brandon Temple Digitally signed by Brandon Temple SLB DE Y Date: 2017.10.25 10:57:10-08'00' Weifen Dai Digitally signed by Wei(eng tai Client Representative: g Date. 2017.10261327:03-08010' Date: 10125117 10/252017 10:30:25AM Page 10 COMPASS 5000.14 Build 85 NADConversion Western North Slope CD5 Alpine West Pad CD5-316 CD5-316 ConocoPhillips Definitive Survey Report 25 October, 2017 ConocoPhillips ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: C135-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5316 actual @ 70.44usft (Doyon 19) Well: CD5-316 Norm Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CDS-316 Well Position +WS +FJ -W Position Uncertainty 0.00 usft Northing: 5,965,834.52 usft Latitude: 70° 18'49.511 N 0.00 usft Easting: 349,250.43 usft Longitude: 151° 13' 18.444 W 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore CDS3161`131 Magnetics Model Name Sample Date Declination Dip Angle Field Strength r) r) ron BGGM2017 7/30/2017 17.06 80.79 57,454 Design CDS-316PB1 Date Audit Notes: To Map Map Vend": 1.0 Phase: ACTUAL Tie On Depth: 36.44 Vertical Section: Depth From (TVD) +NIS +Ei-W Direction 1,133.92 (usft) (usfq (usft) r) 2,386.06 36.44 0.00 0.00 220.00 Survey Program Date From To Map Map (usft) (LISM Survey (Wellbore) Tool Name Description Survey Date 98.80 1,076.25 CD5-316 Srvy 1 - SLB GWD70 (CD5-31 GYD-GC-SS Gyrodata gyro single shots 7/25/2017 10:27. 1,133.92 2,289.67 CDS-316 Srvy 2-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/25/201710:29. 2,386.06 13,800.59 CD5316 Srvy 3- SLB_MWD_GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/30/201710:19: 13,873.32 19,505.68 CD5316PB1 Srvy i-BHI_MWD+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/12/2017 1:44:, Survey 10/252017 10:22:25AM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc AN TVD TVDSS +N/ -S +EI -W Northing Easting DLS Section (usft) (1) (1) (usft) (usft) (usft) (usft) (ft) (ft) (=/100•) (ft) Survey Tool Name 36.44 0.00 0.00 36.44 -34.00 0.00 0.00 5,965,834.52 349,250.43 0.00 0.00 UNDEFINED 98.80 0.65 306.44 98.80 28.36 0.21 -0.28 5,965,834.74 349,250.15 1.04 0.02 GYD-GC-SS(1) 115.50 0.68 299.53 115.50 45.06 0.31 -0.43 5,965,834.84 349,250.00 0.61 0.04 NOT an Actual Survey ZO" 150.56 0.47 279.10 150.56 80.12 0.42 -0.73 5,965,834.95 349,249.71 0.61 0.15 GYD-GC-SS(1) 245.62 0.76 217.62 245.61 175.17 -0.02 -150 5,965,834.53 349,248.93 0.71 0.98 GYD-GC-SS(1) 335.79 1.74 206.74 335.76 265.32 -1.72 -2.48 5,965,832.85 349,247.92 1.11 2.91 GYD-GC-SS(1) 427.34 3.20 208.74 427.22 356.78 -5.20 4.34 5,965,829.41 349,245.99 160 6.77 GYD-GC-SS(1) 519.79 3.76 200.76 519.50 449.05 -10.29 6.65 5,965,824.36 349,243.57 0.80 12.16 GYD-GC-SS(1) 611.07 4.09 200.45 610.57 540.13 -16.14 6.85 5,965,816.56 349,24126 0.36 18.05 GYD-GCSS(1) 704.45 6.44 205.35 703.55 633.11 -24.00 -12.25 5,965,810.77 349,237.70 2.56 26.26 GYD-GCSS(1) 10/252017 10:22:25AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project Western Norm Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellboro: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc AN TVD TVDSS +WS +FJ -W Northing Fasting DLS Section (usft) 0 (1) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 798.21 8.71 217.65 796.49 726.05 -34.37 -18.84 5,965,800.54 349,230.90 2.96 38.44 GYD.GCSS(1) 886.96 1041 220.02 884.00 813.56 45.83 -28.11 5,965,789.26 349,221.41 197 53.18 GYD-GCSS(1) 980.35 1309 219.37 975.43 904.99 50.47 40.24 5,965,77487 349,208.99 2.87 72.19 GYD-GC-SS(1) 1,076.25 1484 218.95 1,068.53 998.09 -78.30 -54.75 5,965,757.35 349,194.12 1.62 95.17 GYD-GC-SS(1) 1,133.92 15.05 217.25 1,124.26 1,053.64 59.92 53.86 5,965,74590 349,184.78 1.04 109.94 MWD+IFR-AKCAZ-SC(2) 1,228.42 17.38 216.17 1,215.01 1,144.57 -111.09 49.62 5,965,725.06 349,168.60 249 136.26 MWD+1FR-AKCAZSC(2) 1,322.21 20.22 214.80 1,303.79 1,233.35 -135.71 -97.14 5,965,700.80 349,150.59 306 166.40 MWD+IFR-AKCAZSC(2) 1,416.81 2232 213.82 1,391.94 1,321.50 -16406 -11847 5,965,672.84 349,130]0 2.25 200.54 MWD+IFR-AK-CAZSC(2) 1,511.00 25.02 211.11 1,478.20 1,407.76 -195.98 -136.72 5,965,641.34 349,109.81 3.09 238.01 MWD+IFR-AK-CAZ-SC(2) 1,605.89 27.26 210.76 1,563.38 1,492.94 -231.84 -158.21 5,965,605.92 349,087.61 2.37 279.29 MWD+IFR-AKCAZ-SC(2) 1,700.39 29.85 210.65 1,646.38 1,575.94 -270.67 -181.27 5,965,567.56 349,063.78 2.74 323.87 MWD+IFR-AK-CAZ-SC(2) 1,794.72 31.79 211.13 1,727.38 1,656.94 -312.14 -206.09 5,965,526.60 349,038.13 2.07 371.59 MAD+1FR-AKCAZ-SC (2) 1,688.64 31.72 211.24 1,807.24 1,736.80 -354.43 -231.68 5,965,484.84 349,011.70 0.10 420.43 MWD+IFR-AKCAZSC(2) 1,983.09 34.92 211.36 1,886.16 1,815.72 -398.75 -258.63 5,965,441,07 348,983.86 3.39 471.71 MWD+IFR-AK-CAZSC(2) 2,077.54 38.08 212.07 1,982.07 1,891.63 446.53 -288.17 5,965,393.90 348,953.37 3.38 527.30 MWD+IFR-AK-CAZ-SC(2) 2,172.54 39.77 214.71 2,035.98 1,985.54 496.34 -321.04 5,965,344]6 348,919.52 2.49 586.58 MWD+IFR-AK-CAZ-SC(2) 2,267.09 41.58 217.53 2,107.69 2,037.25 -546.09 357.38 5,965,29575 348,882.19 2.73 648,05 MWD+1FR-AKCA7-SC(2) 2,289.67 4228 216.89 2,124.49 2,054.05 558.11 366.50 5,965,283.92 348,872.83 3.63 663.12 MWD+IFR-AKCAZ-SC(2) 2,360.00 42.36 217.87 2,17650 2,106.06 -595.74 39524 5,965,246.88 348,843.33 0.94 71042 NDT an Actual Survey 1338'x16" 2,386.06 42.39 218.23 2,195.75 2,125.31 509.57 406.07 5,965233.27 348,832.23 0.94 727.97 MWD+IFR-AK-CAZ-SC(3) 2,452.08 43.15 216.86 2,244.21 2,17337 544.63 434.01 5965,198]8 348,803.60 1.32 772.79 MWD+1FR-AK-CAZ-SC(3) 2,547.72 46.71 216.49 2,311.91 2,241.47 597.36 476.20 5,965,146.92 348,760.36 3.73 840.30 MWD+IFR-AKCAZSC(3) 2,641.18 4640 219.76 2,374.97 2,304.53 -750.84 519.72 5,965,094.32 348,715.78 2.07 99924 MWD+IFR-AKCAZSC(3) 2,735.35 51.15 220.19 2,435.79 2,365.35 -805.94 565.92 5,965,040.16 348,668.49 2.94 Wl A5 MWD+1FR-AKCAZSC(3) 2,829.83 53.68 221.57 2,493.42 2,422.98 4162.53 514.93 5,964,984.57 34$618.36 2.92 1,056.OD MWD+IFR-AK-CAZSC(3) 2,924.19 55.90 224.14 2,547.82 2,477.38 -919.02 567.37 5,964,929.15 348,664.79 3.24 1,132.99 MWD+IFR-AK-CAZ-SC(3) 3,018.35 58.10 225.51 2,599.11 2,52867 -975.02 -723.04 5,964,874.29 348,50801 2.64 1,21167 MWD+IFR-AK-CAZ-SC(3) 3,110.07 60.11 226.51 2,646.20 2,575.76 -1,029.67 47987 5,964,620.78 348,45031 238 1,289.93 MWD+IFR-AKCAZSC(3) 3,202.95 62.28 226.86 2,690.95 2,620.51 -1,085.50 538.88 5,964,766.16 348,389.99 2.36 1,370.76 MWD+IFR-AKCAZSC(3) 3,298.68 64.25 227.52 2,734.01 2,663.57 -1,143.59 -901.80 5,964,709.34 348,326.12 2.15 1,455.58 MWD+IFR-AKCAZ-SC (3) 3,390.58 66.82 229.53 2,772.07 2,70163 -1,198.97 -907.28 5,964,65524 348,262.35 3.43 1,538.29 MWD+IFR-AK-CAZ-SC(3) 3,485.15 69.06 229.99 2,807.59 2,737.15 -1,255.59 -1,031.18 5,984,599.98 348,19433 2.41 1,624.66 MWD+1FR-AK-CAZ-SC(3) 3,579.71 69.67 229.04 2,840.91 2,770.47 -1,313.04 -1,098.48 5,966,543.89 348,125.89 1.14 1,711.94 MWD+IFR-AK-CAZ-SC(3) 3,673.45 70.76 226.63 2,872.63 2,802.19 -1,371.10 -1,164.89 5,964,487.18 348,058.34 125 1,799.10 MWD+IFR-AKCAZSC(3) 3,764.64 72.03 228.00 2,901.71 2,831.27 -1,428.58 -1,229.43 5,964,431.01 347,992.66 1.52 1,88462 MWD+IFR-AKCAZSC(3) 3,858.96 71.97 228.95 2,930.85 2,860.41 -148921 -1,295.54 5,964,371]3 347,925.35 1.06 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3,953.82 72.25 225.76 2,959.99 2,889.55 -1,551,52 -1,360.66 5,964,31075 347,858.79 1.23 2,083.28 MWD+1FR-AK-CAZ-SC(3) 4,047.32 7260 224.30 2,98823 2,917.79 -1,614.51 -0423.92 5,964,24904 347,794.49 1.53 2,152.07 MWD+IFR-AKCAZ-SC(3) 4,141.31 72.55 223.34 3,018.38 2,945.94 -1,679.21 -1,486.01 5,964,185.60 347,731.12 0.98 2,241.54 MWD+IFR-AKCAZSC(3) 4,236.41 72.68 223.08 3,044.79 2,974.35 -1,745.36 -1,548.15 5,964,120.72 347,667.67 0.29 2,332.16 MWD+IFR-AK-CAZ-SC (3) 10/252017 f 0:22:26AM Page 3 COMPASS 500014 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CDS-316 Project Western NOM Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5316 actual @ 70.44usft (Doyon 19) Well: CDS-316 North Reference: True We0fnre: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PS1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +WS +E/.W Northing Easting DLS Section lust!) (1) (1) (usft) (usfa Wall" (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,330.72 7254 223.28 3,072.98 3,002.54 -1,810.99 -1,609.74 5,984056.35 34160478 0.25 2,422.02 MW +IFR-AK-CAZ-SC(3) 4,423.63 72.56 223.72 3,100.84 3,030.40 -1,875.28 -1,670.75 5,963,993.30 347,542.49 045 2,510.49 MWD+IFR-AK-CAZ-SC(3) 4,517.57 72.58 224.24 3,128.98 3,058.54 -1,939.78 -1,732.99 5,963,93007 347,478.98 0.53 2,599.90 MWD+IFR-AK-CAZ-SC;(3) 4,612.69 72.58 223.64 3,157.45 3,087.01 -2,005.13 -1)95.96 5,963,85600 347,414.71 0,60 2,690.44 MWD+IFR-AK-CAZ-SC(3) 4,705.14 72.60 224.42 3,185.12 3,11468 -2,068.55 -1,857.27 5,963,803.83 347,352.14 0.81 2,776.43 MWD+IFR-AK-CAZSC(3) 4,798.99 72.07 224.13 3,213.59 3,143.15 -2,132.58 -1,919.70 5,963,741,07 347,288.44 0.64 2,867.81 MWD+IFR-AK-CAZ-SC(3) 4,89484 71.59 224.49 3,243.42 3,172.98 -2,197.61 -1,983.18 5,963,677.33 347,22367 062 2,958.23 MWD+IFR-AK-CAZ-SC(3) 4,989.18 71.53 225.26 3,273.33 3,202.89 -2,261.16 -2,046.46 5,963,615.06 347,159.14 0.78 3,047.59 MWD+IFR-AK-CAZ-SC(3) 5,083.50 71.53 225.44 3,303.21 3,232.77 -2,324.04 -2,110.11 5,983,553.49 347,094.25 0.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 5,178.53 71.56 225]9 3,333.29 3,26285 -2,387.09 -2,174.53 5,963,491.75 347,026.58 0.35 3,226.38 MWD+IFR-AK-CAZSC(3) 5,272.95 71.57 226.43 3,363.15 3,292.71 -2,449.19 -2,239.08 5,963,430.96 346,962.80 064 3,315.44 MWD+IFR-AK-CAZ-SO(3) 5,366.45 71.53 225.95 3,392.74 3,322.30 -2,510.59 -2,303.09 5,963,370.86 346,89]58 0.49 3,403.62 MWD+1FR-AK-CAZ-SC(3) 5,461.40 71.56 225.48 3,422.80 3,352.36 -2,573.47 -2,367.56 5,963,30929 346,831.86 0.47 3,493.24 MWD+IFR-AK-CAZ-SC(3) 5,555.27 71.56 225.52 3,452.49 3,382.05 -2,635.89 -2,43168 5,983,248.16 346,767.10 064 3,581.88 MWD+IFR-AK-CAZ-SC(3) 5,849.96 71.56 225.23 3,482.44 3,412.00 -2,698.99 .2,495.01 5,963,188.36 346,701.92 0.29 3,671.31 MWD+IFR-AK-CAZ-SC (3) 5,744.30 71.57 225.19 3,512.27 3,441.83 -2,762.04 -2,558.53 5,963,124.60 346,637.16 0.04 3,760.44 MWD+IFR-AK-CAZSC(3) 5,638]7 71.53 225.67 3,542.17 3,471.73 -2,824.93 -2,622.37 5,963,063.01 346,57207 0.48 3,849.65 MWD+IFR-AK-CAZ-SC(3) 5,933.26 71.50 225.31 3,572.13 3,501.69 -2,887.76 -2,686.27 5,983,001.49 346,506.92 0.36 3,938.85 MWD+IFR-AK-CAZ-SC(3) 6,027.10 71.57 225.81 3,601.85 3,53141 -2,950.08 -2,749.83 5,962,940.46 346,442.14 0.51 4,02744 MWD+IFR-AK-CAZ-SC(3) 6,120.92 71.56 224.80 3,631.52 3,551.08 3,01268 -2,813.09 5,962,879.15 346,377.63 1.02 4,116.07 MWD+IFR-AKCAZSC(3) 6,214.35 71.53 22480 3,661.10 3,590.66 3,075.56 -2,875.64 5,962,817.53 346,313.94 0.03 4,204.38 MWD+IFR-AKCAZSC(3) 6.308.67 71.55 22424 3,690.96 3,620.52 -3,139.35 -2,938.28 5,962,755.02 346,249,94 0.56 4,293,57 MWD+IFR-AKCAZSC(3) 6,402.34 71.63 224.69 3,720.53 3.650.09 -3,202.78 3,000.53 5,962,692.86 346,186.43 0.46 4,382.18 MWD+IFR-AK-CAZ-SC (3) 6,497.20 71.40 224.47 3,750.61 3,680.17 -3,266.86 3,063.68 5,962,83006 346,122.01 0.33 4,471.86 MWD+IFR-AK-CAZ-SC(3) 6,591.37 71.57 224.87 3,780.51 3,710.07 -3,330.37 .3,126.46 5,962,567.84 346,057.98 0.44 4,560.86 MWD+IFR-AK-CAZ-SC(3) 6,684.55 71.51 225.26 3,810.02 3,739.58 3,392.80 -3,189.02 5,962,506.68 345,994.17 040 4,648.90 MWD+IFR-AKCAZ-SC(3) 6,778.69 71.44 224.85 3,839.93 3,769.49 -3,455.85 3,252.20 5,962,444.91 345,929.74 0.42 4,737.81 MWD+IFR-AK-CAZSC(3) 6,873.27 71.44 224.69 3,870.03 3,799.59 -3,519.51 3,315.35 5,962,382.54 34505.34 0.16 4,827.16 MWD+IFR-AK-CAZ-SC (3) 6,966.71 71.51 225.08 3,899.72 3,829.28 3,582.28 -3,377.87 5,962,32104 345,801.57 0.40 4,915.44 MWD+IFR-AK-CAZ-SC(3) 7,061.41 71.50 225,09 3,929.76 3,859.32 3,645.69 -3,441.47 5,962,258.92 345,736.72 0.01 5,004.89 MWD+IFR-AKCAZ-SC(3) 7,155.57 71.47 225.07 3,959.66 3,889.22 3,70834 -3,504.69 5,962,197.16 345,672.25 0.04 5,093.83 MWD+IFR.AKCAZ-SC(3) 7,251.39 71.42 22505 3,990.15 3,91911 ],772.90 -3,568.99 5,962,134.31 345,606.68 0.06 5,184.32 MWD+IFR-AK-CAZSC(3) 7,346.55 72.03 22548 4,019.99 3,949.55 -3,836.50 3,633.18 5,962,072.02 345,541.23 0.77 5,274.29 MWD+1FR-AK-CAZSC(3) 7,438.01 71.98 224.44 4,048.25 3,977.81 3,898.05 -3,694.65 5,962,011.72 345,478.55 1.08 5,360.95 MWD+IFR-AK-CAZ-SC(3) 7,532.62 71.96 224.60 4,077.53 4,00].09 3,962.20 -3,757.73 5,961,948.86 345,414.20 0.16 5,450.64 MWD+IFR-AK-CAZ-SC(3) 7,626.80 71.99 224.89 4,106.67 4,038.23 4,02580 3,620.77 5,961,886,53 345,34989 0.29 5,539.69 MWD+IFR-AK-CAZSC(3) 7,720.69 71.99 224.97 4,135.70 4,065.26 4,089.02 -3,883.83 5,961,824,60 345,285.58 008 5,628.65 MWD+IFR-AKCAZSC(3) 7,814.61 72.01 225.63 4,164.73 4,094.29 4,151.85 3,947.32 5,961,78306 345,220.85 0.67 5,717.79 MWD+IFR-AK-CAZSC(3) 7,907.83 72.02 226,60 4,193.51 4,123.07 4,213.31 4,01122 5,961,702.90 345,155.73 0.99 5,805.95 MWD+IFR-AK-CAZ-SC(3) 8,001.23 71.98 225.92 4,222.37 4,151.93 4,274.72 4,075.40 5,961,642.79 345,090.34 0.69 5,894.25 MWD+IFR-AK-CAZ-SC(3) 1025201710,22.26AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CDS-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual (d3 70.44usft (Doyon 19) Well: CDS-316 North Reference: True Wellbore: CD5-316PB7 Survey Calculation Method: Minimum Curvature Design: CDS-316PB1 Database: OAKEDMP2 Survay 10725!2017 10:22:26AM Page 5 COMPASS 5000.14 Build 85 Map Map Vertical MD Ins Azi TVD TVDSS +W -S +FJ -W Northing Easting OLS Section (uslit) P) (1) (wasp (wsIt) (waft) (wall" (ft) (R) (°1100') (R) Survey Tool Name 8,095.52 71.84 225.57 4,251.65 4,181.21 4,337,27 4,139.60 5,961,581.55 345.024.90 0.38 5,983.42 MWD+IFR-AK-CAZ-SC(3) 8,190.64 71.52 225.34 4,281.55 4,211.11 4,400.61 4,203.95 5,981,519.52 $44,95929 0.41 6073.31 MWD+IFR-AK-CAZSC(3) 8,283.93 71.50 225.47 4,311.13 4,240.69 4,462.73 4,266.95 5,961,458.68 344,895.06 0.13 6,161.40 MWD+IFR-AK-CAZSC(3) 8,378.39 71.47 226.52 4,341.13 4,270.69 4,524% 4,33138 5,961,397,77 344,82940 1.05 6,250.47 MWD+IFR-AK-CAZSC(3) 8,472.66 71.44 227.46 4,371.11 4,300.67 4,585.92 4,396.73 5,981,33813 344,762.84 0.95 6,339.18 MWD+IFR-AK-CAZSC(3) 8,566.86 71.41 227.16 4,401.12 4,33068 4,646.46 4,462.37 5,961,278.92 344,696.01 0.30 6,427.75 MWD+IFR-AK-CAZ-SC (3) 8,661.19 71.63 227.01 4,431.02 4,360.58 4,707,38 4,527.89 5,961,219.34 344,629.29 0.28 6,516.53 MWD+IFR-AK-CAZ-SC (3) 8,755.41 71.57 225.59 4,460.76 4,390.32 4,769.15 4,592.52 5,961,158.89 344,563.43 143 6,605.39 MWD+IFR-AK-CAZ-SC(3) 8,849.96 71.47 225.07 4,490.73 4,42028 4,832.19 4,656.29 5,961,097.14 344,498.41 0.53 6694.68 MWD+IFR-AK-CAZ-SC(3) 8,943.68 71.41 224.71 4,520.56 4,450.12 4,895.13 4,719.00 5,961,03547 344,434.46 0.37 6,783.20 MWD+1FR-AK-CAZ-SC(3) 9,037.62 71.48 224.88 4,550.46 4,480.02 4,958.33 -0,78134 5,960,973.55 344,370.46 0.19 6,871.95 MWD+IFR-AK-CA?-SC(3) 9,131.63 71.47 225.66 4,580.33 4,509.69 5,021.06 4,845.07 5,980,912.11 344,305.89 0.79 6,960.71 MWD+IFR-AK-CAZSC(3) 9,226.41 71,54 226.20 4,610.39 4,539.95 -5,083.58 4,909.65 5,960,850.90 344,240.08 0.55 7,050.11 MWD+IFR-AK-CAZ-SO (3) 9,320.96 71.47 226.69 4,640.39 4,569.95 -5,145.37 4,974.63 5,960,790.44 344,173.87 0.50 7,139.21 MWD+IFR-AK-CAZ-SC(3) 9,416.14 71.54 227.20 4,670.58 4,600.14 -5,206.99 5,040.59 5,960,730.16 344,106.70 0.51 7,228.81 MWD+IFR-AK-CAZ-SC(3) 9,509.75 71.54 226.36 4,700.22 4,62918 5,267.79 5,105.29 5,960,67057 344,040.79 0.85 7,316.98 MWD+IFR-AK-CAZ-SC(3) 9,604.30 71.47 226.05 4,73021 4,65917 5,329.85 -5,770.02 5,960,609.93 343,974.84 0.32 7,408.13 MWD+IFR-AK-CAZ-SC(3) 9,698.73 71.53 225.47 4,760.18 4,689.74 5,392.33 -5,234.17 5,960,54816 343,90945 0.59 7,495.22 MWD+IFR-AK-CA7SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 5,455.41 -5,297.76 5,960,486.97 343,844.61 0.48 7,584.42 MWD+IFR-AKCAZSC(3) 9,888.23 77.51 224.84 4,820.26 4,749.82 -5,519.25 5,361.42 5,980,424.43 343,779.69 0.15 7,674.24 MWD+IFR-AK-CAZSC(3) 9,981.40 71.47 224.70 4,849.84 4,77940 -5,581.97 5,423.64 5,966362.97 343,716.23 0.15 7,762.29 MWD+IFR-AK-CAZ-SC(3) 10,075.46 71.54 22661 4,879.68 4,809.24 -5,644.88 5,486.88 5,960,301.35 343,651.74 092 7,851.13 MWD+IFR-AK-CAZ-SC (3) 10,16910 71.48 225.41 4,909.56 4,839.72 5,707.51 5,550.60 5,960,240.02 343,586.74 021 7,940.09 MWD+IFR-AK-CAZ-SC(3) 10,261.84 71.54 225.24 4,93819 4,868.35 5,768.95 -5,612.78 5,960,179.84 343,523.38 0.19 6,027.09 MWD+IFR-AK-CAZ-SC(3) 10,350.14 71.54 223.92 4,968.01 4897.57 5,831.31 -5,674.23 5,960,11814 343,46070 1.36 8,114.36 MWD+IFR-AK-CAZ-SC(3) 10,448.48 71.51 22301 4,997.91 4,927.47 5,898.25 -5,735.78 5,960,055.05 343,397.86 092 8,20388 MWD+IFR-AK-CAZ-SC(3) 10,542.93 71.44 223.34 5,027.92 4,957.48 -5,961.56 -5,797.06 5,959,990.99 343,335.29 0.34 8,293.10 MWD+IFR-AK-CAZSC(3) 10,63]66 7144 222.95 5,058.07 4,987.63 5,027.08 5,858.47 5,959,92611 343,272.58 0.39 8,382.76 MWD+IFR-AK-CAZSC(3) 10,732.15 71.54 223.40 5,088.07 5,017.63 5,092.42 5,919.78 6959,882.62 343,209.97 0.48 8,472.23 MWD+IFR-AK-CAZSC(3) 10,826.66 71.47 223.51 5,118.05 5,1NI 61 5,157.49 -5,981.42 5,959,79681 343,147.04 0.13 8,56169 MWD+IFR-AK-CAZ-SC(3) 10,920.49 71.51 224.37 5,14284 5,077.40 5,221,55 5,043.16 5,959,736.00 343,080.03 0.87 8,650.46 MWD+IFR-AK-CAZ-SC(3) 11,015.60 71.57 225.09 5,178.02 5,107.58 5,285.78 5,706.79 5,959,673.07 343,019.13 0.72 8,740.55 MWD+IFR-AK-CAZ-SC(3) 11,110.71 71.54 225.23 5,208.05 5,137.61 5,349.27 5,170.63 5,959,610.88 342,954.04 0.14 8,83022 MWD+IFR-AK-CAZSC(3) 11,204.34 71.51 225.98 5,237.72 5,167.28 5,411.39 5,234.08 5,959,550.05 342,889.35 0.76 8,97860 MWD+IFR-AKCAZSC(3) 11,29822 71.51 225.54 5,267.49 5,197.05 5,473.51 5,297.87 5,959,489.23 342,824.34 0.44 9,007,19 MWD+IFR-AK-CAZSC(3) 11,39243 71.47 226.35 5,297.40 5,226.96 6,535.63 5,362.07 5,959,428.42 342,758.91 0.82 9,096.04 MWD+IFR-AK-CAZSC(3) 11,486.60 71.57 226.81 5,327.26 5,256.82 5,597,04 6,426.97 5,959,36832 342,69219 0.46 9,184.81 MWD+IFR-AK-CAZSC(3) 11,581.31 71.51 225.71 5,357.24 5,288.80 5,659.13 6,491.85 5,959,307.56 342,626.69 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11,675.58 71.54 226.01 5,387.11 5,316.67 6,721.40 6,555.01 5,959,248.59 342,561.29 0.30 9,353.01 MWD+IFR-AKCAZ-SC(3) 11,769.70 71.45 226.05 5,416.98 5,346.54 6,783.36 6,620.25 5,959,185.93 342,495.83 0.10 9,451.77 MWD+IFR-AKCAZ-SC(3) 10725!2017 10:22:26AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-316 Project: Western North Slope ND Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 Norm Reference: True Wellbore: CDS-316PB7 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +WS +EI -W Northing Easting DLS Section (usft) (I (") (usft) (usft) (usft) (usft) (ft) (ft) (°11001 (ft) Survey Tool Name 11,864.23 71.54 226.31 5,446.99 5,376.55 5,845.43 5,884.93 5,959,125.18 342,429.92 0.28 9,540.89 MWD+IFR-AK-CAZ-SC(3) 11,957.80 71.51 225.67 5,476.64 5,406.20 5,907.09 5,748.76 5,959,064.82 342,384.87 0.65 9,629.15 MWD+IFR-AK-CAZSC(3) 12,052.51 71.56 226.14 5,506.64 5,436.20 5,969.60 5,613.27 5,959,003.62 342,299.12 0.47 9,718.51 MWD+IFR-AK-CAZSC (3) 12,146.60 71.54 225.89 5,536.41 5,465.97 -7,031.59 5,877.49 5,958,94294 342,23367 0.25 9,80727 MWD+1FR-AK-CAZSC(3) 12,241.51 71.53 225.34 5,566.47 5,496.03 4,094.55 5,941.83 5,958,881.28 342,16809 0.55 9,896.87 MWD+IFR-AK-CAZSC(3) 12,335.11 71.57 225.41 5,596.10 5,525.66 -7,156.93 -7,005.02 5,958,820.20 342,103.66 0.08 9,965.26 MWD+IFR-AK-CAZSC(3) 12,429.97 71.56 225.27 5,626.09 5,55565 -7,220.18 -7,069.03 5,958,758.25 342,038.40 0.14 10,074.87 MWD+IFR-AK-CAZSC(3) 12,523.83 71.47 224.14 5,655.85 5,585.41 -7,283.45 -7,13165 5,958,696.25 341,974.52 1.15 10,163.58 MWD+IFR-AKCAZ-SC(3) 12,618.97 71.51 224.02 5,686.06 5,615.62 4,348.26 -7,194.41 5,958,632.72 341,910.48 0.13 10,253.57 MWD+IFR-AKCAZ-SC(3) 12,711.50 71.54 224.33 5,715.38 5,64.94 -7,411.20 -7,255.57 5,958,571.02 341,848.08 0.32 10,341.10 MWD+IFR-AK-CAZ-SC(3) 12,806.89 71.65 224.34 5,745.50 5,675.06 -7,475.94 -7,318.82 5,958,507.57 341,783.54 0.12 10,431.35 MWD+IFR-AK-CAZ-SC (3) 12,901.29 72.05 224.84 5,774.90 5,704.46 -7,539.82 -7,381.80 5,958,444.97 341,719.30 066 10,520.77 MWD+IFR-AK-CAZ-SC(3) 12,995.80 71.98 224.41 5,804.09 5,733.65 -7,603.80 -7,444.94 5,958,382.28 341,654.69 0.44 10,610.36 MWD+IFR-AK-CAZ-SC (3) 13,090.91 71.99 224.79 5,633.50 5,763.06 -7,668.20 -7,508.45 5,956,319.17 341,590.11 0.36 10,700.52 MWD+IFR-AK-CAZ-SC (3) 13,184.41 71.93 224.60 5,862.45 5,792.01 -7,731.40 -7,570.98 5,958,257.25 341,52633 0.20 10,789.13 MWD+IFR-AK-CAZ-SC(3) 13,279.48 71.90 22411 5,891.97 5,821.53 -7,795.68 -7,634.50 5,958,194.25 341,461.53 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,373.83 72.04 225.41 5,921.17 5,850.73 -7,859.06 -7,698.00 5,958,132.17 341,396.77 0.72 10,968.57 MWD+IFR-AK-CAZSC(3) 13,468.20 71.50 225.44 5,95069 5,88025 -7,921.97 -7,761.85 5,958,070.58 341,331.68 0.57 11,057.80 MWD+IFR-AKCAZ-SC(3) 13,562.30 71.51 226.89 5,980.54 5,910.10 -7,983.77 -7,826.22 5,958,010.07 341,266.09 1.46 11,146.52 MWD+IFR-AK-CAZ-SC(3) 13,656.37 71.47 226.33 6,010.41 5,939.97 5,045.05 -7,891.04 5,957,950.11 341,200.05 0.57 11,235.13 MWD+IFR-AKCAZ-SC(3) 13,750.15 71.45 227,14 6,04023 5,969.79 -8,105.99 -7,955.79 5,957,890.49 341,134.10 0.82 11,323.43 MWD+IFR-AKCAZ-SC (3) 13,800.59 71.44 226.74 6,05628 5,985.64 -8,138.63 -7,990.73 5,957,658.55 341,098.52 0.75 11,370.90 MWD+IFR-AWCAZ-SC(3) 13,838.00 7158 227.62 6,068.14 5,997,70 5,162.75 5,016.75 5,957,834.96 341,072.02 2.25 11,406.10 NOT an Actual Survey 8 618" x 12.114" 13,873.32 71 ]2 228.4 6,079.26 6,008.82 5,185.17 5,041.67 5,957,81305 341,04655 2.25 11,439.29 MWD+IFR-AK-CAZ-SC(4) 13,898.17 71.59 228.79 6,067.08 6,016.64 5,200.76 5,059.37 5,957,797.81 341,028.65 1.44 11,462.61 MWD+IFR-AKCAZ-SC(4) 13,991.32 71.56 226.41 6,116.53 6,046.09 5,260.35 5,124.63 5,957,73856 340,962.21 2.42 11,550.20 MWD+1FR-AKCAZSC(4) 14,085.38 72.04 222.75 6,145.92 6,075.48 5,323.98 5,187.33 5,957,67720 340,898.25 3.73 11,639.25 MWD+IFR-AKCAZSC(4) 14,177.07 72.60 216.38 6,173.77 6,103.33 5,390.33 5,244.12 5,957,612.01 340,840.14 4.58 11,726.58 MWD+IFR-AKCAZSC(4) 14,271.68 73.52 214.04 6,201.35 6,130.91 5,463.34 5,297.56 5,957,540.09 340,785.25 449 11,816.86 MWD+IFR-AKCAZSC(4) 14,365.76 74.04 209.05 6,227.65 6,157.21 5,540.30 5,344.80 5,957,464.10 340,736.48 5.12 11,906.18 MWD+IFR-AK-CAZ-SC(4) 14,460.74 75.09 204.81 6,252.94 6,182.50 5,621.91 5,386.25 5,957,383.35 340,69341 4.44 11,995.34 MWD+IFR-AK-CAZ-SC(4) 14,556,16 75,82 201.60 6,276.90 6,206.46 5,706.79 5,422.63 5,957,299.22 340,655.33 3.34 12,083.75 MWD+IFR-AK-CAZ-SC(4) 14,650,34 75.82 200.54 6,299.98 6,229.54 5,79199 5,455.46 5,957,214.70 340,62080 1.09 12,170.12 MWD+IFR-AK-CAZ-SC(4) 14,745.48 75.94 201.69 6,323.19 6,25275 5,878.06 5,488.69 5,957,129.32 340,585.84 1.18 12,257.42 MWD+IFR-AK-CAZ-SC(4) 14,840.21 76.04 202.02 6,346.12 6,275.68 5,963.37 5,522.91 5,957,044.73 340,549.93 0.35 12,34436 MWD+IFR-AK-CAZ-SC(4) 14,933.66 76.00 203.20 6,36815 6,298.31 -9,047.26 5,557.84 5,956,961,56 340,513.31 1.22 12,431.48 MWD+IFR-AKCAZSC(4) 15,028.23 76.00 202.54 6,391.58 6,321.14 5,131.63 5,593.43 5,956,877.93 340,476.04 0.68 12,518.98 MWD+IFR-AKCAZSC(4) 15,122.85 76.02 203.81 6,414.45 6,344.01 -9,216.03 -8,629.56 5,956,794.28 340,438.23 1.30 12,606.86 MWD+IFR-AK-CAZSC(4) 15,216.07 76.00 203.65 6,436.99 6,366.55 -9,298.84 5,665.96 5,956,712.22 340,400.17 0.17 12,693.70 MWD+IFR-AK-CAZSC(4) 15,311.54 75.97 203.99 6,460.11 6,389.67 -9,383.57 -8,703.37 5,956,628.26 340,361.07 0.35 12,782,65 MWD+IFR-AK-CAZ-SC(4) 107252017 10:22: 26AM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-316 project Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CDS-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey 1025201710:2Z26AM Page 7 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +W -S +E1 -W Northing Easting DLS Section (usft) (°) 1°) (usft) (usft) (usm (usft' (ft) (ft) (°/100') (ft) Survey Tool Name 15,405.90 75.97 204.07 6,482.98 6,412.54 -9,46].18 41,740.65 5,956,645.42 340,322.13 0.08 12,870.67 MM+IFR-AK-CAZSC(4) 15,499.48 7538 20411 6,505.82 6,435.38 -9,549.82 -8,778.12 5,956,463.56 340,283.01 0.69 12,956.05 MWD+IFR-AK-CAZSC(4) 15,593.24 75.78 204.38 6528.85 6,458.41 -9,632.51 -6,815.88 5,956,38165 340,243.60 0.34 13,045.67 MW0+1FR-AK-CAZ-SC(4) 15,687.69 75.78 203.76 6,552.05 6,481.61 -9,716.10 -8,853.22 5,956,298.83 340,204.59 0.64 13,133.71 MWD+IFR-AK-CAZ-SC (4) 15,761.97 75.81 203.31 6,575.19 6,504.75 -9,799.90 -8,88912 5,956,21579 340,165.42 0.48 13,221.36 MWD+IFR.AK-CAZSC(4) 15,876.86 75.81 202.90 6,598.45 6,528.01 -9,884.51 -8,92582 5,956131.92 340,12863 0.42 13,309.38 MWD+IFR-AK-CAZ-SC(4) 15,972.96 75.78 202.74 6,622.03 6,551.59 -9,970.38 -8,961.95 5,956,046.80 340,090.79 0.16 13,398.39 MWD+IFR-AK-CAZ-SC (4) 16,065.85 75.81 202.15 6,644.83 6,574.39 A0,053.61 48,996.33 5,955964.29 340,05415 0.62 13,484.24 MWD+IFR-AK-CAZ-SC(4) 16,160.10 75.79 201.84 6,667.95 6,59].51 -10,138.33 -9,030.55 5,955,880.28 340,018.83 0.32 13,571.14 MWD+IFR-AK-CAZ-SC(4) 16,253.94 75.78 201.55 8,690.99 6,620.55 -10,222.85 -9,064.16 5,955,796.45 339,983.52 0.30 13,657.50 MWD+IFR-AK-CAZ-SC(4) 16,348.37 7585 201.68 6,714.13 6,643.69 -10,307.97 -9,097.90 5,955,712.04 339,948.10 0.15 13,744.38 MWD+1FR-AK-CAZ-SC(4) 16,443.15 75.75 201.67 6,737.38 6,666.94 -10,393.35 -9,131.84 5,955,627.36 339,912.45 0.11 13,831.60 MWD+IFR-AK-CAZSC(4) 16,534.91 75.94 201.97 6,759.82 6,689.38 -10,47595 -9,184.91 5,955,545.45 339,87713 0.38 13,916.14 MWD+IFR-AK-CAZSC(4) 16,627.09 76.04 202.73 6,782.14 6,711.70 -10,558.67 -9,198.92 5,956463.43 339,842.07 0.81 14,001.36 MWD+IFR-AK-CAZSC(4) 16,720.91 76.01 202.99 6804.80 6,734.38 40,642.56 -9,234.29 5,955,380.28 339,80503 027 14,088.36 MWD+IFR.AKCAZ-SC(4) 16,815.80 75.97 203.48 6,827.77 6,757.33 -10,727.16 -9,270.61 5,955,296.43 339,767.02 O.M 14,176.52 MWD+IFR-AKCAZ-SC(4) 16,911.83 75.91 203.84 6,851.10 6,780.66 -10,812.49 -9,307.99 5,955,211.88 339,727.94 0.37 14,265.91 MWD+IFR-AK-CAZ-SC (4) 17,004.42 75.95 204.42 6,87361 6,803.17 -10,894.45 9,344.71 5,955,130.67 339,689.58 0.61 14,352.30 MWD+IFR-AKCAZ-SC(4) 17,098.39 75.95 204.47 6,896.42 6,825.98 -10,977.44 -9,382.43 5,955,048.47 339,650.21 0.05 14,440.12 MWD+IFR-AKCAZ-SC (4) 17,193.34 75.94 204.22 6,919.48 6,849.04 -11,061.36 -9,420.40 5,954,965.34 339,610.56 0.26 14,528.81 MWD+IFR-AKCAZ-SC(4) 17,286.86 75.77 203.93 6,942.33 6,87189 -11,144.15 -9,457.39 5,954,883.31 339,571.92 0.35 14,61601 MWD+IFR-AK-CAZ-SC(4) 17,382.09 7588 203.04 6,985.65 6,895.21 -11,228.83 -9,494.19 5,954,799.39 339,533.43 0.91 14,704.53 MWD+IFR-AK-CAZSC(4) 17,476.04 75.76 202.61 6,988.67 6,918.23 -11,312.79 -9,529.52 5,954,716.16 339,496.42 0.46 14,791.56 MWD+IFR-AK-CAZSC (4) 17,669.67 75.79 20164 7,011.68 6941.24 -11,396.86 -9,56310 5,954,632.80 339,460.56 1.00 14,877.93 MWD+IFR-AK-CAZSC(4) 17,664.13 75.83 201.20 7,034.83 6,964.39 -11,482.11 -9,597.15 5,954,548.24 339,425.42 045 14,984.74 MWD+IFR-AKCAZSC(4) 17,75647 75.78 201.38 7,057.97 6,987.53 -11,567.33 -9,630.36 5,954,463.71 339,390.51 0.19 15,051.36 MWD+IFR-AKCAZSC (4) 17,852.89 75.77 201.59 7,081.17 7,010.73 -11,652.50 -9,663.88 5,954,379.25 339,355.28 0.22 15,138.15 MWD+IFR-AK-W-SC(4) 17,947.14 75.75 20203 7,104.35 7,033.91 -11,73731 -9,697.82 5,954,295.14 339,319.85 0.45 15,224.94 MWD+IFRAKCAZ-SC(4) 18,041.76 75.72 201.77 7,127.67 7,057.23 -11,822.40 -9,732.02 5,954,210.78 339,283.75 0.27 15,312.11 MWD+IFR-AKCAZ-SC(4) 18,136.27 75.91 201.94 7,150.83 7,080.39 -11,907.44 -9,766.13 5,954,126.43 339,247.94 0.27 15,399.18 MWD+IFR-AKCAZ-SC(4) 18,229.93 75.97 202.45 7,173.58 7,103.14 -11,991.56 -9,800.45 5,954,04302 339,21194 0.53 15,485.68 MWD+IFR-AK-CAZ-SC(4) 18,324.38 75.98 202.73 7,196.47 7,126.03 -12,076.17 -9,83565 5,953,959.14 339,17505 0.29 15,573.12 MWD+IFR-AK-CAZ-SC(4) 18,419.05 75.97 203.92 7,219.41 7,148.97 -12,160.50 -9,872.02 5,953,875.56 339,137.00 1.22 15,661.10 MWD+IFR-AK-CAZSC(4) 18,513.50 75.90 203.62 7,242.37 7,171.93 -12,244.35 -9,908.95 5,953,792.47 339,09640 0.32 15,749.07 MWD+IFR-AK-CAZSC (4) 18,607.46 7595 202.42 7,265.22 7,194.78 -12,328.23 -9,944.59 5,953,709.33 339,08109 124 15,836.23 MWD+IFR-AK-CA?SC(4) 18,701.96 76.69 199.84 7,287.57 7,217.13 -12,413.87 -9,977.68 5,953,624.38 339,02628 2.77 15,923.11 MWD+IFR-AK-CAZSC(4) 18,796.52 76.73 197.04 7,309.31 7,238.87 -12,501.16 -10,006.79 5,953,537.70 338,995.43 2.88 16,OOB.68 MWD+IFR-AKCAZ-SC(4) 18,890.61 76.70 197.21 7,330.94 7,260.50 -12,588.67 -10,033.75 5,953,450.75 338,966.72 0.18 16,093.05 MWD+IFR-AKCAZ-SC(4) 18,985.10 7749 195.34 7,352.04 7,281.60 -12,677.08 -10,059.56 5,953,362.89 338,939.14 2.10 16,177.37 MWD+IFR-AK-CAZ-SC(4) 19,078.16 78.08 194.43 7,37113 7,30129 -12,784.98 -10,08292 6953,275.48 336,914.02 1.15 16,259.72 MWD+IFR-AK-CAZSC(4) 1025201710:2Z26AM Page 7 COMPASS 5000.14 Build 85 n ConocoPhillips Definitive Survey Report company: NADConversion Local Coordinate Reference: Well CDS-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CDS-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey P1 Surface Coordinates 0 Declination & Convergence Surveys from 13,873 32 to 19,505.68 are O GRS Survey Corrections BHI surveys. p Survey Tool Codes Brandon Temple by ando08'00'Temple Date: SLB DE: 017.1.2511:ned Date: 2017.10.25 11:00:15 -06'00' Map Map Vertical MD Inc Azi TVD TVDSS +WS +EJ -W Northing Basting DLS Section (usft) r) (1) (term Nam (usffl tuslp (ft) Ift) (°1190') (ft) Survey Tool Name 19,173.32 78.62 193.21 7,390.95 7,320.51 -12,855.48 -10,105.18 5,953,185.45 338,88995 1.38 16,343.36 MWD+IFR-AK-CAZ-SC(4) 19,269.82 79.19 192.31 7,409.52 7,339.08 -12,947.84 -10,126.10 5,953,093.54 338,86719 1.09 16,427.65 MWD+IFR-AK-CAZ-SC(4) 19,364.13 79.96 190.33 7,426.58 7,356.14 -13,03818 -10,144.30 5,953,002.99 338,847.16 2.22 16,508.92 MWD+IFR-AK-CAZ-SC(4) 19,458.38 79.90 188.56 7,442.71 7,372.27 -13128.36 -10,15920 5,952,913.74 338,830.47 1.89 16,587.11 MWD+IFR-AK-CAZ-SC(4) 19,505.68 79.89 187.12 7,451.36 7,380.92 -13,17646 -10,165.82 5,952,865.76 338,822.88 2.87 16,628.22 MWD+IFR-AK-CAZ-SC(4) 19,537.00 79.89 187.12 7,456.86 7,386.42 -13,20]05 -10,16965 5,952,635.27 338,81845 0.00 16,654.11 NOT an Actual Survey 844 open rinal Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. ❑ Yes ❑ No I have checked to the best of my ability that the following data is correct: P1 Surface Coordinates 0 Declination & Convergence Surveys from 13,873 32 to 19,505.68 are O GRS Survey Corrections BHI surveys. p Survey Tool Codes Brandon Temple by ando08'00'Temple Date: SLB DE: 017.1.2511:ned Date: 2017.10.25 11:00:15 -06'00' Client Representative: Wei9 Dai fen Date. 10125(17 10/252017 f0:22:26AM Page 6 COMPASS 5000.14 Build 85 Cement Summary Report CD5-316 String: Conductor Cement Job: DRILLING ORIGINAL, 7/241201710:00 Cement Fluids & Additives Val Pumped Welbom Das Start Dale End Dale Fluid (bbl) Dem pbmgap Thick Too (hr) CD5-316 Surface Casing Cement 7/28/2017 05:00 7/28/2017 08:15 Surface Cement 347.2 11.00 5.80 C05-316 Surface Casing Cement 7/28/2017 05:00 7/28/2017 08:15 Tail Cement 72.4 15.80 4.50 CD5-316 Intermediate Casing Cement 819/2017 21:06 8/10/2017 02:10 Lead Cement 424.7 13.00 0.00 CD5-316 Intermediate Casing Cement 8/9/2017 21:06 8/10/2017 02:10 Tail Cement 54.2 15.80 0.00 CD5- Cement Plug 8/23/2017 16:30 8/23/2017 17:30 Plug Back Cement 64.6 15.80 6.00 316PB1 CD5- Cement Plug 8/25/2017 16:00 8/25/2017 17:30 Plug Back Cement 48.3 15.80 5.75 316PB1 CD5- Cement Plug 8126/2017 05:00 8/2612017 05:45 Plug Back Cement 54.0 17.00 5.75 3161381 CD5-316 I Liner Cement 917/2017 10:00 9/7/201712:49 Intermediate Cement 60.1 15.801 13.00 Page 111 ReportPrinted: 10/2412017 a li Cement Detail Report C D5-316 String: Conductor Cement Job: DRILLING ORIGINAL, 7/24/201710:00 Cement Details Description Conductor Cement Cementing Start Date 311/201618:26 Cementing End Date 311/201618:26 Wellbore Name CD5-316 Comment 5.5 yds, 50/50 sand I gravel aggregate poured cement in two stages. Cement Stages Stage # 1 Description Conductor Cement Objective Top Depth (ftKB) Tack bottom conductor 80.0 Bottom Depth (ftKB) 115.5 Full Return? No Vol Cement... Top Plug? No Stm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No I Pipe RPM (rpm) Tagged Depth IRKS) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment AFC cement Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est elm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft-Isack) Mix H2O Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Cone Unit label Stage # 2 Description Conductor Cement Objective Top Depth (ftKB) Cement conductor 1 36.5 Bottom Depth (ftKB) 80.0 Full Return? No Vol Cement... Top Plug? No I Btm Plug? No Q Pump but (bourn... Q Pump Final (boll... Q Pump Avg (bbl/... 1 P Pump Final (psi) P Plug Bump (psi) Recip? 1 No Stroke (ft) RotatedT No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment AFC Cement Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft'/sack) Mix H2O Ratio (gallsa... Free Water (%) Density (lb/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Coma Unit label Page 1N Report Printed: 1012412017 Cement Detail Report CD5-316 String: Surface Casing Job: DRILLING ORIGINAL, 7/24/2017 Cement Details Description Surface Casing Cement Cementing Start Date 7/28/2017 05:00 Cementing End Date 7/28!2017 06:15 Wellbore Name CD5-316 Comment Cement Stages Stage # 1 Description Surface Casing Cement Objective Top Depth (ftKB) Cement from 500'to 35.5 surface Bottom Depth (ftKB) 1,869.0 Full Return? Yes Vol Cement... 171.5 Top Plug? No Bim Plug? Yes Q Pump [nit (bbilm.. 6 Q Pump Final (bb[/... 6 Q Pump Avg (bbl/... 6 P Pump Final (psi) P Plug Bump (psi) Recip7 Yes Stroke (it) 12.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 11.0 ppg Litecrete lead cement. Reciprocated untill cement around. No losses. Cement Fluids & Additives Fluid Fluid Type Surface Cement Fluid Description Estimated Top (ftKB)Eat 35.5 Bhn (ftKB) 1,869.0 Amount (sacks) 1,020 Class G Volume Pumped (bbl) 347.2 Yield (ft'/sack) 1.91 Mix H2O Ratio (gallsa... 6.75 Free Water (%) Density (lb/gal) 11.00 Plastic Viscosity(Pa•S) 267.0 Thickening Time (hr) 5.80 CmprStr t (psi) Additives Additive Antifoam Type D046 Concentration 0.2 Cons Unit label %BWOC Additive Fluid Loss Control Type D167 Concentration 0.5 Conc Unit label %BWOC Additive Retarder Type D177 Concentration 0.0 Conc Unit label gaVsx Additive Dispersant Type D185 Concentration 0.06 Conc Unit label gallsx Stage # 2 Description Surface Casing Cement Objective Top Depth (ftKB) Cement bottom 500 feet 1,869.0 casing Bottom Depth (ftKB) 2,370.0 Full Return? Yes Vol Cement... Top Plug? Yes Son Plug? No Q Pump Init (bbUm... 4 Q Pump Final (bbl/...Q 4 Pump Avg (bbU... 4 P Pump Final (psi) 500.0 P Plug Bump (psi) 990.0 Recip? Yes Stroke (ft) 12.00 Rotated? No Pipe RPM( Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 15.8 ppg Conventional type G. Reciprocated until cement around. No losses. Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 1 1,869.0 Est Btm (ftKB) Amount 2,370.0 (sacks] 346 Class Volume G 1 Pumped (bbl) 72.4 Yield (Wisack) 1.16 Mix H2O Ratio (ga[lsa... 5.09 Free Water (%) Density(Ib/gal) Plastic 15.80 Viscosity (Pais) 142.0 Thickening Time (hr) CmprStr 4.50 t (psi) Additives Additive Antifoam Type D046 Concentration 0.2 Conc Unit label %BWOC Additive Dispersant Type D065 Concentration 0.3 Conc Unit label %BWOC Additive Fluid Loss Control Type D167 Concentration 0.4 Unit label %BWConcOC Page 1/1 Report Printed: 10124120171 a Cement Detail Report C D5-316 • String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 7124/201710:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 8/9/2017 21:06 8/10/2017 02:10 CD5-316 Comment Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing 7,912.0 13,838.8 Yes Yes Yes Cement O Pump Init (bbllm... Q Pump Final (bbil... Q Pump Avg (bbll... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 3 7 600.0 1,100.0 Yes No Tagged Depth (f KB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Lined up and flushed lines w/ 4.9 bbl of water. Pressure tested lines to 4500 psi and pumped 80 bbl of 10.5 ppg MudPushll spacer followed by 434.7 bbl of 13 ppg Lead cmt and 54.2 bbl of 15.8 ppg tail cmt. Dropped top dart and chased w/ 10 bbl of water followed by displacement w/ mud from the rig at 8 bpm, 280 psi. Slowed to 3 bpm to latch plug at 4211 strokes and resumed 7 bpm. Slowed pumps to 3 bpm and bumped plug @ 8991 strokes. Pressured up to 1100 psi and held for 5 min. Bleed off and checked floats, floats held. Full returns to surface. Cement Fluids 8 Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Som (ftKB) Amount (sacks)Class Volume Pumped (bbl) Lead Cement 7,912.0 13,338.0 1,214 G 1 424.7 Yield (ft'lsack) Mix H2O Ratio Issues... Free Water (%) Density (Iblgal)Plastic Viscosity (Pa•s) Thickening Time (hr) CMPrStr 1 (psi) 1.96 10.80 13.00 0.00 Additives Additive Type Concentration Cone Unit label Retarder D013 0.35 %BWOC Additive Type Concentration Cone Unit label Extender D020 6.0 %BWOC Additive Type Concentration Cone Unit label Antifoam D047 0.05 gal/sx Additive Type Concentration Cone Unit label Dispersant D065 0.2 %BWOC Additive Type Concentration Cone Unit label Extender D079 1 0.3 %BWOC Additive Type concentrationConc Unit label Retarder 0110 0.04 gaUsx Additive Type Concentration Cone Unit label Fluid Loss Control D255 0.5 %BWOC Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) CG' Volume Pumped (bbl) Tail Cement 13,338.0 13,834.0 250 G 54.2 Yield (ft' /sack) Mix H2O Radio (gadsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pas) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.10 15.80 0.00 Additives Additive Type Concentration Cone Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Cone Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Cone Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Cone Unit label Retarder D177 0.03 gaUsx Page 1/1 ReportPrinted: 1 012 412 01 7 a Cement Detail Report CD5-316 String: Liner Cement Job: DRILLING ORIGINAL, 7/24/201710:00 Cement Details Description Cementing Start Date Cementing End Date Wellhore Name Liner Cement 9/7/2017 10:00 9!7!2017 12:49 CDS-316 Comment Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Liner Cement Curt Int.2 Liner 18,469.0 19,333.0 Yes Yes Yes O Pump Ind (bbl/m... O Pump Final (bbl!... O Pump Avg (bbll... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft)Rotated? Pipe RPM (rpm) 4 2 720 490.0 1,000.0 Yes 50.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pumped 40 bbl of 12.5 ppg MPII spacer at 3.7 bpm. Launched bottom dart and chased with 60.1 bbl of 15.8 ppg cmt. Launched top dart w/ 20 bbl of H2O from the cmt unit. Swapped over to rig pumps and displaced w/ 406 bbl of 11.1 ppg mud at 4 bpm. Bumped plug w/ 1000 psi. Increased to 2700 psi and S/0 70k to set Hanger Continued up to 3900 psi to set hanger packer. Bleed off and checked floats, "Floats Held". Messed from hanger and sheared subs at 80k. TIP @ 12:45" 'TOL= 13,681" Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Eat Btm (ftKB) Amount (sacks)Class Volume Pumped (bbl) Intermediate Cement 18,469.0 19,333.0 290 C 1 60.1 Yield (fNlsack)Mix H2O Ratio Igallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa•s) Thickening Time (hr) CmprSM 1 (psi) 1.16 5.07 15.80 13.00 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Conc Unit label Retarder D177 0.02 gal/sx Page 111 Report Printed: 1012412017 a Cement Detail Report CD5-316 String: Cement Plug Job: DRILLING ORIGINAL, 7/24/2017 10:00 Cement Details Description Cement Plug Cementing Start Date 8/231201716730 Cementing End Date 8/23/2017 17:30 Wellbore Name CD5316PB1 Comment Cement Stages Stage 01 Description Cement Plug Objective Isolate Kuparuk C Top Depth (ftKB) 18,236.0 Bottom Depth (ftKB) 18,908.0 Full Return? Yes Vol Cement... Top Plug? No etm Plug? No O Pump but (bbl/m... 5 IQ Pump Final (bbll... 8 IQ Pump Avg (bbll... 8 P Pump Final (psi) 1,450.0 P Plug Bump (psi) Rectp? Yes Stroke (ft)Rofated7 60.00 No Pipe RPM (rpm) Tagged Depth (ftKB) 18,236.0 Tag Method Work String Depth Plug Drilled Out To IRKS) Drill Out Diameter (in) Comment Cement Fluids 8 Additives Fluid Fluid Type Plug Back Cement Fluid Description Estimated Top (ftKB)Est 18,236.0 Bfm (ftKB) 18,908.0 Amount (sacks) 312 Class G Volume Pumped (bbl) 64.6 Yield (R'/sack) 1.16 Mix H2O Ratio (gallsa... 5.07 Free Water (%) Density (Ibigal)Plastic 15.80 Viscosity (Pa•a) 131.0 Thickening Time (hr) 6.00 CmprStr 1 (psi) Additives Additive Antifoam Type D046 Concentration 0.2 Conc Unit label %BWOC Additive Dispersant Type D065 Concentration 0.3 Conc Unit label %BWOC Additive Retarder Type D177 Concentration 0.025 Conc Unit label gal/sx Additive Fluid Loss Control Type D187 Concentration 0.4 Conc Unit label %BWOC Page 111 Report Printed: 10124/2017 e Cement Detail Report CD5-316 String: Cement Plug Job: DRILLING ORIGINAL, 7124/201710:00 Cement Details Description Cementing Start Date Cementing End Data Wellbore Name Cement Plug 8/25/2017 16:00 8/25/2017 17:30 CDS-316PB1 Comment Cement Stages Stage N 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Retum? Vol Cement... Top Plug? Btm Plug? Cement Plug Isolation per BLM 15,500.0 16,000.0 Yes No No Q Pump ]nit (bbirm.. O Pump Final (bbll... O Pump Avg (bbll... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 4 8 8 1,134 1 Yes 1 30.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 38 ppb Gel pill bottom @ 18,000' MD Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB)Est BM (ftKB) Amount (sacks) Class Volume Pumped (bbl) Plug Back Cement 15,500.0 16,000.0 233 G 48.3 Yield (ft'/sack) Mix H2O Ratio (gallsa... Free Water (%) Density (Ib/gaQ Plastic Viscosity (Pais) Thickening Time (hr) Cmprstr 1 (psi) 1.16 5.07 1,.8.1 132.0 5.75 Additives Additive Type Concentration Cone Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Cone Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Cone Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Cone Unit label Retarder D177 0.02 gallsx Page 1/1 Report Printed: 10/2412017 Cement Detail Report a C D5-316 String: Cement Plug Job: DRILLING ORIGINAL, 7/24/201710:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Cement Plug 8/26/2017 05:00 8/26/2017 05:45 CD5-316PB1 Comment Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Who Plug? Cement Plug Kickoff plug 13,762.0 14,155.0 Yes No I No O Pump Init (bbUm... O Pump Final (bbU... O Pump Avg (bull... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 8 1,000.0 Yes 30.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To IRKS) Drill Out Diameter (in) 13,762.0 Work String 8112 Comment Tagged TOC @ 13,762' MD Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Plug Back Cement 13,762.0 14,155.0 302 G 54.0 Yield (ft'/sack) Mix 1120 Ratio (gal/sa... Free Water (%) Density (IWgal) Plastic Viscosity (Pas) Thickening Time (hr) CmprStr 1 (psi) 1.00 3.85 17.00 210.0 5.75 Additives Additive Type Concentration Cone Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Cone Unit label Dispersant D065 1.0 %BWOC Additive Type Concentration Cone Unit label Fluid Loss Control D167 0.2 %BWOC Additive Type Concentration Cone Unit label Retarder D177 0.02 gallsx Page 1/1 Report Printed: 10/24/2017 mberger Drilling & Measurements Product Delivery Customer: ConocoPhillips Alaska Dispatched To: 21 7040 28 75 8 Transmittal#: 30OCT17-SP01 DATA LOGGED ♦k / i /2011 M. K, BENDER AOGCC: Makana Bender Well Name: CD5-316 Date Dispatched: 30 -Oct -17 Service Order #: 17AKA0026 Dispatched By: Stephanie Pacillo Product Description Hardcopy Digital Copy Logging Date Color Log Prints: 4 Contents on CD 23 -Sep -17 Scope Resistivity, 2" MD x x 2" TVD x x 5 MD x x 5" TVD ITEC IVEQ OCT i 0 20V AO 03CC Digital Data N/A Contents on CD DLIS / LAS Data x Surveys 2 Contents on CD Directional Survey Nad27 x x Directional Survey Nad83 x x CD 1 Contents on CD Data: DLIS/ LAS x Graphics: PDF x Surveys: PDF/TXT x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp(a)conocoohillios.com AlaskaPTSPrintCenter(o)slb.com Attn: Tom Osterkamp Attn: Stephanie Pacillo Received By: RECEIVED LFINAL NADConversion Western North Slope CD5 Alpine West Pad CD5-316 CD5-316 OCT 30 2017 AOGCC ConocoPhillips Definitive Survey Report 25 October, 2017 21 7040 28 75 8 ConocoPhillips ConocoPhillips Definitive Survey Report Company: NADConversion Local Cc -ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: ODS -316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Can Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CDS-316 Magnetics Well Position +N/ -S 0.00 usft Northing: 5,965,834.52 usft Latitude: 70° 18'49.511 N Inc +E/ -W 0.00 usft Easting: 349,250.43 usft Longitude: 151° 13' 18.444 W Position Uncertainty 57.451 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore CD5-316 Magnetics Model Name Sample Date Declination Dip Angle Field Strength Vertical MD Inc Azi (^T) TVDSS BGGM2017 9/5/2017 17.00 80.79 57.451 DLS Section (usft) (1 (°) Design CDS-316 (usft) (usft) (ft) Audit Notes: (°/100') (ft) Survey Tool Name MA4 0.00 Version: 1.0 Phase: ACTUAL Tie On Depth: 13.873.32 Vertical Section: Depth From (TVD) +Nl-S +E/ -W Direction 0.00 UNDEFINED 98.80 (usft) (usft) (usft) (°) 28.36 0.21 36.44 0.00 0.00 220.00 1.04 0.02 GYD-GC-SS 1 115.50 0.58 299.53 115.50 Survey Program Dale -043 5,965.83484 349,25000 From To 20" (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 98.80 1,076.25 CD5316 Srvy 1 - SLB_GWD70 (CD5-31 GYD-GC-SS Gyrodata gyro single shots 7/25/2017 1027 1,133.92 2,289.67 CD5-316 Srvy 2 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/25/201710:29 2,386.06 13,800.59 CD5-316 Srvy 3- SLB _MWD_GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/30/20171019 13,873.32 13,873.32 CD5-316PB1 Srvy 1- BHI _MWD+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/12/2017 1:44: 13,935.17 19,278.96 CD5-316 Spry 4- SLB _MWD+GMAG(C MWD+iFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/29/2017 9:38: 19,341.54 23,336.41 CD5-316 Srvy 5-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 9/13/201710:11: 23,356.49 27,738.41 CD5-316 Srvy 6- SLB _MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 9/18/2017 902: Survey 10252017 10:30:25AM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +NI -S +E/ -W Northing Easting DLS Section (usft) (1 (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name MA4 0.00 0.00 3844 -34.00 0.00 0.00 5.96583482 349.250.43 0.00 0.00 UNDEFINED 98.80 0.65 306.44 98.80 28.36 0.21 -0.28 5,965,834.74 349,250.15 1.04 0.02 GYD-GC-SS 1 115.50 0.58 299.53 115.50 45.06 0.31 -043 5,965.83484 349,25000 0.61 0.04 iwran Actual Survey 20" 150.56 0.47 279.10 150.56 80.12 042 -0.73 5.965,63495 349,249.71 0.61 0.15 GYD-GC-SS(1) 24562 076 217.62 245.61 175.17 -0.02 -1.50 5,965,834.53 349,248.93 071 0.98 GYD-GC-SS (1) 33579 1,74 206.74 335.76 265.32 -1.72 -2.48 5,965,83285 349,247.92 1.11 2.91 GYD-GC-SS(1) 427.34 3.20 208.74 427.22 356.78 -5.20 4.34 5,965,829.41 349,245.99 1.60 6.77 GYD-GC-SS(1) 519.79 3.76 200.76 519.50 449.06 -10.29 6.65 5,965,824.36 349,243.57 0.80 12.16 GYD.GC-SS(1) 10252017 10:30:25AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS -NIS +E/ -W Northing Easting DLS Section (usft) (°) 0 (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 611.07 4.09 200.45 610.57 540.13 -16.14 -8.85 5,965,818.56 349.241.26 0.38 18.05 GYD-GC-SS(1) 704.45 6.44 205.35 703.55 633.11 -24.00 -12.25 5,965,81077 349,237.70 2.56 26.26 GYD-GC-6S(1) 798.21 8.71 217.65 796.49 726.05 -34.37 -18.84 5,965.800.54 349,230.90 2.96 38.44 GYD-GC-SS(1) 886.% 10.41 220.02 804.00 813.56 45.83 -28.11 5,965,789.26 349,221.41 1.97 53.18 GYD-GC-SS(1) 980.35 13.09 219.37 97543 904.99 -60.47 40.24 5,965,774.87 349,208.99 2.87 72.19 GYD-GC-$S(1) 1,076.25 1464 218.95 1,068.53 99809 -78.30 -5 75 5,965,757.35 349,194.12 1.62 95.17 GYD-GC-SS(1) 1,133.92 15.05 217.25 1,124.28 1,053.84 -89.92 -63.85 5,965,74590 349,18478 1.04 109.94 MWD+IFR-AK-CAZ-SC(2) 1,228.42 17M 216.17 1,21501 1,144.57 -111,09 -7962 5,965,725.06 349,168.60 2.49 136,28 MWD+1FR-AK-CAZ-SC(2) 132221 20.22 214.80 1,30339 1,233.35 -135.71 -97.14 5,965)00.80 349,150.59 3.06 166.40 MVM+IFR-AK-CAZ-SC(2) 1,416.81 22.32 213.82 1,391.94 1,321.50 -164.06 -116.47 5,965,672.84 349,13070 2.25 200.54 MWDHFR-AK-CAZ-SC(2) 1,511.00 25.02 211.11 1,478.20 1,407.76 -195.98 -136.72 5,965,641.34 349,109.81 309 238.01 MWD+IFR-AK-CAZ-SC(2) 1,605.89 27.26 210.76 1,563.38 1,492.94 -231.84 -158.21 5,965,605.92 349,087.61 2.37 27929 MWD+IFR-AK-CAZ-SC(2) 1,700.39 29.85 210.65 1,646.38 1,575.94 -270.67 -181.27 5,965,567.56 349.063.78 2,74 323.87 MWD+IFR-AK-CAZ-SC (2) 1,794.72 31.79 211.13 1,727.38 1,656.94 -312.14 -208.09 5.965 526.60 349,038.13 2.07 371.59 MWD+IFR-AK-CAZ-SC (2) 1,888.64 31.72 211.24 1,807.24 1,736.80 -354.43 -231.68 5.965,484 84 349,011.70 0.10 420.43 MWD+IFR-AK-CAZ-SC(2) 1,983.09 3492 211.36 1,886.16 1,815.72 -398.75 -258.63 5,965,441.07 348,983.86 3.39 471.71 MWD+IFR-AK-CAZ-SC(2) 2,077.54 38.08 212.07 1,962.07 1,89163 446.53 -288.17 5,965,393.90 348,953.37 3.38 527.30 MWD+IFR-AK-CAZ-SC(2) 2,172.54 39.77 21431 2,035.98 1,965.54 -496.34 -321.04 5,965,344.76 348,919.52 2.49 586.513 MWD+IFR-AK-CAZ-SC(2) 2.267.09 41.58 217.53 2,107.69 2,03725 -546.09 -357.38 5,965,295.75 348,882.19 2.73 648.05 MWD+IFR-AK-CAZ-SC(2) 2,289.67 4228 216.89 2,124.49 2,054.05 -558.11 -366.50 51965283.92 348,87263 3.63 663.12 MWD+IFR-AK-CAZ-SC(2) 2,360.00 42.38 217.87 2,176.50 2,105.06 -595.74 -395.24 5,965,246.88 348,843.33 0.94 71042 NOT Og Actual $aN6y 13 318" x 16" 2,386.06 42.39 218.23 2,195.75 2,125.31 -609.57 406.07 5,965,23327 348,832.23 0.94 727.97 MWDHFR-AK-CAZ-SC(3) 2,452.08 43.15 218.86 2,244.21 2,17377 -644.63 43401 5,965,198.78 346,80360 1.32 772.79 MWD+IFR-AK-CAZ-SC(3) 2,54732 4671 218.49 2,311.91 2.24147 -697 36 -476.20 5,965,146.92 348,760.36 313 840.30 MWD+IFR-AK-CAZ-SC(3) 2,641.16 4840 219.76 2,374.97 2,304.53 -750.84 -51972 5,965,094.32 348,715.78 2.07 909.24 MWD+IFR-AK-CAZ-SC(3) 2,735.35 51.15 220.19 2,435.79 2,365.35 -805.94 -565.92 5,965,040.16 348.668.49 2.94 981.15 MWD+IFR-AK-CAZ-SC (3) 2,829.83 53.68 221.57 2,49342 2,422.98 -862.53 -614.93 5,964,984.57 348,618.36 2.92 1,056.00 MM+IFR-AK-CAZ-SC(3) 2.924.19 55.90 224.14 2,547.82 2,477.38 -919.02 E67.37 5,964929 15 348,56479 3.24 1,132.99 MWD+IFR-AK-CAZ-SC(3) 3,018.35 58.10 225.51 2,599.11 2,528.67 -975.02 -723.04 5,964874.29 348,508.01 264 1,21167 MWD+IFR-AK-CAZ-SC(3) 3,110.07 60.11 226.51 2,646.20 2.57516 -1,029.67 -779.67 5,964,820.78 348,450.31 2.38 1,289.93 MWD+IFR-AK-CAZ-SC(3) 3,202.95 62.28 226.86 2,69095 2,620.51 -1,085.50 -838.88 5,984766 16 348,369.99 2.36 1,370.76 MWD+IFR-AK-CAZ-SC(3) 3,298.68 64.25 227.52 2,734.01 2,663.57 -1,143.59 -901.60 5,964,709.34 348,326.12 2.15 1,455.58 MWD+IFR-AK-CAZ-SC(3) 3,39058 66.82 229.53 2,772.07 2,701.63 -1,198.97 -964.28 5,964,655.24 348,262.35 3.43 1,538.29 MWD+IFR-AK-CAZ-SC(3) 3,485.15 69.06 229.99 2,807.59 2,737.15 -1,255.59 -1,031.18 5,964,599.98 348,194.33 2.41 1,624.66 MWD+1FR-AK-CAZ-SC(3) 3,579.71 6967 229.04 2,840.91 2,770.47 -1,31364 -1,098.48 5,964,54389 348,125.89 1.14 1,711,94 MWD+IFR-AK-CAZ-SC(3) 3,673.45 70.78 228.63 2,872.63 2,802.19 -1,371.10 -1,164.89 5,964,487.18 348,058.34 1.25 1,799.10 MWD+IFR-AK-CAZ-SC (3) 3,764.64 72.03 228.00 2,90171 2,831.27 -1,428.58 -1,22943 5,964431D1 347,992.66 1.52 1,88462 MWD+IFR-AK-CAZ-SC(3) 3,858.96 71.97 226.95 2.930.85 2,860.41 -1,489.21 -1,295.54 5,964,371.73 347,925.35 166 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3.953.82 72.25 225.76 2,959.99 2,889.55 -1,551.52 -1,360.86 5,964,310.75 347,858.79 1.23 2,063.28 MWD+IFR-AK-CAZ-SC(3) 1025201710:30:25AM Page 3 COMPASS 500014 Build 85 Conocolohillips Definitive Survey Report Company: NADConvemion Local Coordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1S +E/.W Northing Easting DLS Section (usft) (°) V) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 4,047.32 72.60 224.30 2,988.23 2,917.79 -1,61451 -1,423.92 5,9U,249 04 347,794.49 153 2,152.07 MWD+IFR-AKCAZ-SC(3) 4,141.31 72.55 223.34 3,016.38 2,945.94 -1,679.21 -1,486.01 5,964.185.60 347,731.12 0.98 2,241.54 MWD+IFR-AK-CAZ-SC(3) 4,236.41 7268 223.08 3,04479 2,974.35 -1,745.38 4,548.15 5,964,12072 347,667.67 029 2,332.16 MWD+IFR-AK-CAZ-SC(3) 4,330.72 72.54 223.28 3,072.98 3,002.54 -1,810.99 -1,609.74 5,964,056.35 347,60478 0.25 2,422.02 MWD+IFR-AK-CAZ-SC(3) 4,42363 72.56 223.72 3,100,84 3,030.40 -1,87528 -1,670.75 5,963,993.30 347,542.49 0.45 2,510.49 MWD+IFR-AK-CAZ-SC(3) 4,517.57 72.58 224.24 3,128.98 3,058.54 -1,939.78 -1,73299 5;963,930.07 347,478.98 0.53 2,599.90 MWD+IFR-AK-CAZ-SC(3) 4,61269 72.58 223.64 3,157.45 3,087.01 -2,005.13 -1,795.96 5,963,866.00 347,41471 0.60 2,69044 MWD+1FR-AK-CAZ-5C(3) 4,705.14 7260 .224.42 3.185.12 3,11468 -2,068.55 -1.85727 5,963,803.83 347,352.14 0.81 2,778.43 MWD+1FR-AK-CAZ-SC(3) 4,79899 7207. 224.13 3,213.59 3,143.15 -2,13258 -1,919.70 5,963,74107 347,288.44 0.64 2,867.61 MWD+IFR-AK-CAZ-SC(3) 4,89464 71.59 224.49 3,243.42 3,17298 -2,197.61 -1,983.18 5,963,677.33 347,223.67 0.62 2,958.23 MWD+IFR-AK-CAZ-SC(3) 4,989.18 71.53 225.26 3,273.33 3,202.89 -2,261.16 -2,046.46 5,963,615.06 347,159.14 078 3,047.59 MWDNFR-AK-CAZ-SC (3) 5,083.50 71.53 22544 3,303.21 3,23217 -2,324.04 -2,110.11 5,963,553.49 347,094.25 0.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 5,178.53 71.56 225.79 3333.29 3,262.85 -2,387.09 -2,174.53 5,963,49175 347.028.58 0.35 3,226.38 MWD+IFR-AK-CAZ-SC(3) 5,272.95 71.57 22643 3,363.15 3,292.71 -2,449.19 -2,23908 5.963.430.96 346,96280 0.64 3,315.44 MWD+IFR-AK-CAZ-SC(3) 5,36545 71.53 225.95 3,392.74 3.322.30 -2.510.59 -2,303.09 5,963,370.86 346,897.58 0.49 3,40362 MWD+IFR-AK-CAZ-SC(3) 5,46140 71.56 22548 3,422.80 3,352.36 -2,57347 -2,367.56 5,963.309.29 346,831.86 047 3,493.24 MW0+IFR-AK-CAZ-SC(3) 5.55527 71.56 225.52 3,452.49 3,382.05 -2,635.89 -2.431.08 5,963,248.16 346,767.10 0.04 3,581.88 MWD+IFR-AK-CAZ-SC (3) 5,649.96 71.55 22523 3.482.44 3,412.00 -2,698.99 -2,495.01 5,963,186.36 346,701.92 0.29 3,671.31 MWDNFR-AK-CAZ-SC(3) 5,744.30 71.57 225.19 3,512.27 3,441.83 -2,762.04 -2,55853 5.963 124.60 346,637.16 0.04 3,760.44 MWD+IFR-AK-CAZ-SC(3) 5,638.77 71.53 22567 3,542.17 3,471.73 -2,824.93 -2,622.37 5,963,06301 346,572.07 0.48 3.849.65 MWD+IFR-AK-CAZ-SC(3) 5,93326 71.50 225.31 3,572.13 3,50169 -2,887.75 -2,686.27 5,963,001.49 346,506.92 0.36 3,938.85 MWD+IFR-AK-CAZ-SC 13) 6,027.10 71.57 22581 3,601.85 3,531.41 -2,95008 -2,749.83 5,962,940.46 346,442.14 0.51 4,027.44 MW0+IFR-AK-CAZ-SC(3) 6,120.92 71.56 224.80 3,631.52 3,561.08 -3,012.68 -2,813.09 5,962,879.15 346,377.63 1.02 4,116.07 MWD+IFR-AK-CAZ-SC(3) 6,214.35 71.53 224.80 3,661.10 3,590.66 -3,075.56 -2,875.54 5,962,81763 346,313.94 003 4,204.38 MWD+IFR-AK-CAZ-SC(3) 6,308.67 71.56 224.24 3,690.96 3,620.52 -3,139.35 -2,938.28 5,962,755.02 346,249.94 0.56 4,293.57 MWD+IFR-AK-CAZ-SC (3) 6,402.34 71.63 224.69 3,720.53 3,650.09 -3.202]8 -3,000.53 5,962,69286 346,18643 046 4,382.18 MWD+IFR-AK-CAZ-SC (3) 6,497.20 71.40 224.47 3,750.61 3,680.17 -3,266.86 -3.063.68 5,962630.06 346,122.01 0.33 4,471.86 MWD+1FR-AK-CAZ-SC(3) 6.591.37 71.57 224.87 3,780.51 3,710.07 -3,330.37 -3,126.46 5,962,567.84 346,05798 0.44 4,560.86 MWD+IFR-AK-CAZ-SC(3) 6,684.55 71.51 225.26 3,81002 3,739.58 -3,392.80 -3,189.02 5,962,50668 345,994.17 040 4,648.90 MWD+IFR-AK-CAZ-SC(3) 6,778.69 71.44 22485 3,839.93 3,769.49 -3,455.85 -3,252.20 5,962,44491 345,929.74 042 4,737.81 MWD+IFR-AK-CAZ-SC(3) 6,873.27 71.44 224.69 3,870.03 3,799.59 -3,519.51 -3,315.35 5,962,38254 345,865.34 0.16 4,827.16 MWD+IFR-AK-CAZ-SC (3) 6,96671 71.51 225.08 3,899.72 3,82928 -3,58228 -3,377.87 5,962,321.04 345,801.57 0.40 4,915.44 MWD+1FR-AK-CAZ-8C(3) 7,06141 71.50 225.09 3,92976 3,859.32 -3,645.69 -3.441.47 5,962,258.92 345,736.72 0.01 5,004.89 MWD+IFR-AK-CAZ-$C(3) 7,155.57 71.47 225.07 3,959.66 3,889.22 -3,70874 -3,504.69 5,962,197.16 345,672.25 0.04 5,093.83 MW1)+IFR-AK-CAZ-SC(3) 7,251.39 7142 225.05 3,990.15 3,919.71 -3,772.90 -3,56899 5,962,134.31 345,60668 0.06 5,184.32 MWD+IFR-AK-CAZ-SC(3) 7,346.55 7203 225.48 4,01999 3,949.55 -3,836.50 -3,633.18 5,962,072.02 345,541.23 0.77 5,274.29 MWD+IFR-AK-CAZ-SC (3) 7,438.01 71.98 224.44 4,048.25 3,977.81 -3,898.05 -3,694.65 5,962.011.72 345,478.55 1.08 5,360.95 MWD+IFR-AK-CAZ-SC (3) 7,53262 71.96 22460 4,077.53 4,007.09 -3,962.20 -3,75773 5,961,948.86 345,414.20 0.16 5,450.64 MWD+IFR-AK-CAZ-$C(3) 7,626.80 71.99 224.89 4,106.67 4.036.23 -4,025.80 -3,820.77 5,961,686.53 345,349.89 0.29 5,539.89 MWD+IFR-AK-CAZ-SC(3) 7,720.69 71.99 224.97 4,135.70 4,065.26 -4,089.02 -3,88383 5,961,82460 345,285.58 0.08 5,628.85 MWD+IFR-AK-CAZ-SC(3) 10252017 10.30.25AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) Ift) (ft) (°1100') (ft) Survey Tool Name 7,81461 72.01 225.63 4,164.73 4,094.29 -4,151.85 -3947.32 5,961]6306 345,220.85 0.67 5,717.79 MWD+IFR-AK-CAZ-SC(3) 7,907.83 7202 22680 4,193.51 4,123.07 -4,213.31 -4,D11.22 5.961,70290 345,155.73 0.99 5,805.95 MWD+IFR-AK-CAZ-SC(3) 8,00123 7198 225.92 4.222.37 4,151.93 -4,274.72 -4075.40 5,961,642 79 345,090.34 069 5,894.25 MW0+1FR-AK-CAZ-SC(3) 8,095.52 71.84 22557 4,251.65 4,18121 4,337.27 4.139.60 5,961,581.55 345,024.90 0.38 5,983.42 MWD+1FR-AK-CAZ-SC(3) 8,190.64 71.52 225.34 4,281.55 4,211.11 4,40061 4,203.95 5.961,519.52 344,959.29 0.41 6,073.31 MWD+1FR-AK-CAZ-8C(3) 8,283.93 71.50 225.47 4,311.13 4,240.69 4,462.73 -4,266.95 5,961,45868 344,895.06 0.13 6,161.40 MWD+IFR-AK-CAZ-SC(3) 8,378.39 7147 226.52 4,341.13 4,270.69 -4,524.% -4,331.38 5,961,397.77 344829.40 1.05 6,25047 MWDNFR-AK-CAZ-6C(3) 8,472.66 71.44 22]46 4.371.11 4.30067 -4,585.92 -4,396.73 5,961,338.13 344762.84 095 6,339.18 MWD+IFR-AK-CAZ-SC(3) 8,56686 7141 227.16 4,401.12 4,330.68 -4,646.46 -4,462.37 5,961,27892 344,696.01 0.30 6,427.75 MWD+11FR-AK-CAZ-SC(3) 8,661.19 71.63 22701 4,431.02 4,360.58 4,707.38 -4,527.89 5,961,21934 344,629.29 028 6,516.53 MWD+IFR-AK-CAZ-SC(3) 8,755.41 71.57 225.59 4,460.76 4,390.32 -4,769.15 4,592.52 5,961,158.89 344,56343 1.43 6,605.39 MWD+IFR-AK-CAZ-SC(3) 8,849% 71.47 22507 4,49073 4,420.29 4,832.19 4,656.29 5,961,097.14 344,498.41 0.53 6.694.68 MWD+IFR-AK-CAZ-SC(3) 8,94366 71.41 22471 4,520.56 4,450.12 -4,895.13 4.719.00 5,96103547 344,434.46 0.37 6,783.20 MWD+1FR-AK-CAZ-8C(3) 9,037.62 71.48 224.88 4,550.46 4,48002 -4,958.33 -4,781.74 5,960,973.55 344,370.46 0.19 6,871.95 MWD+IFR-AK-CAZ-SC(3) 9,131.63 71.47 22566 4,580.33 4,509.89 -5,021.06 -4,845.07 5,960,912.11 344,305.89 0.79 6,960.71 MWD+IFR-AK-CAZ-SC(3) 9,22641 71.54 226.20 4,610.39 4,539.95 -5.083.58 -4.90965 5.960,850.90 344,240.08 055 7,050.11 MWD+IFR-AK-CAZ-SC(3) 9,320.96 71.47 22669 4,640.39 4,569.95 -5,145.37 -4,974.63 5,9W,790 44 344,17387 0.50 7,139.21 MWD+IFR-AK-CAZ-SC(3) 9,416.14 71.54 22720 4,670.58 4,600.14 -5,208.99 -5,040.59 5,960,730.16 344,106.70 051 7,228.81 MWD+IFR-AK-CAZ-SC(3) 9,509.75 71.54 226.36 4,700.22 4,629.78 -5,267.79 -5,105.29 5,960.670.67 344040.79 0.85 7,316.98 MWD+IFR-AK-CAZ-SC (3) 9,604.30 7147 226.05 4,730.21 4,659.77 -5,329.85 -5,17002 5,960,609.93 343,974.84 0.32 7,406.13 MWD+IFR-AK-CAZ-SC(3) 9,698.73 71.53 225.47 4,760.18 4,689.74 -5,392.33 -5,234.17 5960,548]6 343,90945 059 7,495.22 MWD+IFR-AK-CAZ-SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 -5,455.41 -5.297.76 5,960,486.97 343,84461 0.48 7,51NIA2 MWD+IFR-AK-CAZ-SC (3) 9.888.23 71.51 224.84 4,820.26 4,749.82 -5,519.25 -5,36142 5,960,424.43 343,77969 0.15 7,67424 MWD+IFR-AK-CAZ-SC (3) 9,981.40 71.47 224.70 4,849.84 4,77940 -5,581.97 -5,42364 5.960,362 97 343,71623 0.15 7,762.29 MWD+1FR-AK-CAZ-SC(3) 10,075.46 71.54 225.61 4,87968 4,809.24 -5,644.88 -5486.88 5,960,301.35 343,651.74 0.92 7,851.13 MWD+IFR-AK-CAZ-SC(3) 10,169.70 71.48 22541 4,9D9.56 4,839.12 -5,707.51 -5,550.64 5,960,240.02 343,586.74 0.21 7.940.09 MWD+IFR-AK-CAZ-SC(3) 10,261.84 71.54 225.24 4,9M79 4,868.35 -5,768.95 -5,612.78 5,960,179.84 343,523.38 D.19 8,027.09 MWD+IFR-AK-CAZ-SC(3) 10,354.14 71.54 223.92 4,968.01 4,897.57 -5,831.31 -5,674.23 5,960118.74 343,460.70 1.36 8,114.36 MWD+IFR-AK-CAZ-SC (3) 10,44848 7151 223.01 4,997.91 4,927.47 -5,896.25 -5,73578 5,960,055.05 343,397.86 0.92 8,203.68 MWD+IFR-AKCAZ-SC(3) 10,542.93 71.44 223.34 5,027.92 4,957.48 -5.96156 -5,797.06 5,959,990.99 343,335.29 0.34 8,293.10 MWD+IFR-AK-CAZ-SC(3) 10,637.68 7144 222.95 5.058.07 4,987.63 -6.027.08 -5,858.47 5,959,92671 343.272.58 0.39 8,382.76 MWD+IFR-AK-CAZ-SC(3) 10,732.15 71.54 223.40 5,088.07 5,017.63 -6,092.42 -5,919.78 5,959,862.62 343,209.97 0.46 8,472.23 MWD+IFR-AK-CAZ-SC(3) 10,828.66 71.47 223.51 5,118.05 5,047.61 -6,157.49 -5,98142 5,959,79881 343,147.04 0.13 8,561.69 MWD+1FR-AK-CAZ-SC(3) 10,92049 71.51 224.37 5,147.84 5,077.40 -6,221.55 -6,043.16 5.959.7W 00 343,064.03 0.87 8,650.46 MWD+IFR-AK-CAZ-SC(3) 11,01580 71.57 225.09 5,178.02 5,107.58 -6,285.78 6,106.79 5,959,673.07 343.019.13 0.72 8,740.55 MWD+IFR-AK-CAZ-SC(3) 11,110.71 71.54 225.23 5,208.05 5.13761 -6,349.27 -6,170.63 5,959,61088 342,954.04 0.14 8,830.22 MWD+IFR-AK-CAZ-SC(3) 11,204.34 71.51 225.98 5,237.72 5,167.28 -6,411.39 6.234.08 5,959,550.05 342,889.35 0,76 8,91860 MWD+IFR-AK-CAZ-SC(3) 11,298.22 7151 225.54 5,26749 5,197.05 6,473.51 6,297.87 5,959,489.23 342.824.34 0.44 9,007.19 MWD+IFR-AK-CAZ-SC(3) 11392.43 71.47 226.35 5,297.40 5,226.96 6.53563 -6,36207 5,959.426.42 342,758.91 0.82 9,096.04 MW +IFR-AK-CAZ-8C(3) 11486.64 71.57 226.81 5,327.26 5,258.82 6,597.04 -6,426.97 5.959,368.32 342,692.79 048 9,184.81 MWD+IFR-AK-CAZ-SC(3) 10/252017 f0:3025AM Page 5 COMPASS 5000.14 Build 85 Conocolohillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usit (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Welt: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11581.31 71.51 225.71 5,357.24 5,286.80 -6,659.13 .6,491.85 5,95930756 342,62669 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11,675.58 71.54 226.01 5,387.11 5,316.67 -6721.40 -6,556.01 5,959,24659 342,561.29 0.30 9,363.01 MWD+IFR-AK-CAZ-SC(3) 11,769.70 71.45 226.05 5,416.98 5,346.54 -6,783.36 -6,62025 5,959,18593 342,495.83 0.10 9,451.77 MWD+IFR-AK-CAZ-SC(3) 11,86423 71.54 226.31 5,446.99 5,376.55 -6,845.43 -6,684.93 5,959,125.18 342,429.92 0.28 9,540.89 MWD+IFR-AK-CAZ-SC(3) 11,957.80 71.51 22567 5,47664 5,40620 -6,907.09 6,746.76 5,959,064.82 342,364.87 0.65 9,629.15 MWD+IFR-AK-CAZ-SC(3) 12,052.51 71.56 226.14 5,50664 5,436.20 -6,969.60 -6,813.27 5,959,003.62 342,299.12 0.47 9,718.51 MWD+IFR-AK-CAZ-SC(3) 12,146.60 71.54 225.89 5,536.41 5465.97 -7,031.59 -6,877.49 5,958,942.94 34223367 0.25 9,807.27 MWD+IFR-AK-CAZ-SC (3) 12,241.51 71.53 225.34 5,565.47 5,496.03 -7,094.55 -6,941.83 5,958,881.28 342,168.09 0.55 9,896.87 MWD+IFR-AK-CAZ-SC (3) 12,335.11 71.57 225.41 5,595.10 5,52566 -7.156.93 -7.005.02 5,958,820.20 342,10366 008 9,985.26 MWDHFR-AK-CAZ-SC(3) 12.429.97 71.56 225.27 5,626.09 5,555.65 -7,220.18 -7.069.03 5,958,756.25 342.038.40 0.14 10,074.87 MWD+IFR-AK-CAZ-SC(3) 12,523.83 71.47 224.14 5,655.85 5,585.41 -7,283.45 -7,131.65 5,958,696.25 341,974.52 1.15 10,16&58 MWD+IFR-AK-CAZ-$C(3) 12,618.97 71.51 224.02 5,686.06 5.615.62 -7,348.26 -7,194.41 5,958,632.72 341,910.48 0.13 10,253.57 MWD+IFR-AK-CAZ-SC(3) 12,711.50 71.54 224.33 5,715.38 5,644.94 .7,411.20 .7,255.57 5,958,57102 341,848.08 0.32 10,341.10 MWD+IFR-AK-CAZ-SC(3) 12,806.89 71.65 224.34 5,745.50 5.675.06 -7,475.94 -7,318.82 5956507.57 341,783.54 0.12 10,431.35 MWD+IFR-AK-CAZ-SC(3) 12,901.29 72.05 224.84 5.774.90 5,704.46 4,539.82 -7,381.80 5,95s 444.97 341.719.30 066 10,520.77 MWD+IFR-AK-CAZ-$C(3) 12,995.80 71,98 224.41 5,804.09 5,733.65 -7,603.80 -7,444.94 5,958,382.28 341,654.89 0.44 10,610.36 MWD+IFR-AK-CAZ-SC(3) 13,090.91 71.99 224.79 5,833.50 5,763.06 -7,66820 -7,508.45 5,958,319.17 341,590.11 0.38 10,700.52 MWD+IFR-AK-CAZ-SC(3) 13,184.41 71.93 224.60 5,862.45 5.792.01 -7,731.40 -7,570.98 5,958,257.25 341.526.33 0.20 10,789.13 MWD+IFR-AK-CAZ-SC (3) 13,279.48 71.90 224.71 5,891.97 5,821.53 -7,795.68 -7,634.50 5,958,194.25 341,461.53 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,373.83 72.04 22541 5,921.17 5,850.73 -7,859.06 -7,698,00 5,958,132.17 341,396.77 0.72 10,968.57 MWD+IFR-AK-CAZ-SC(3) 13,468.20 71.50 225.44 5,95069 5,880.25 -7,921.97 -7,761.85 5.958,070.56 341,331.68 0.57 11,057.60 MWD+IFR-AK-CAZ-SC (3) 13,562.30 71.51 226.89 5,980.54 5,910.10 -7,983.77 -7,826.22 5,958.010.07 341,266.09 146 11,146.52 MWD+IFR-AK-CAZ-SC(3) 13.656.37 7147 226.33 6,01041 5,939.97 -8,045.05 -7,891.04 5.957,950 11 341,200.05 0.57 11,235.13 MWD+IFR-AK-CAZ-SC 13) 13,750.15 71.45 227.14 6,04023 5,96979 -8,10599 -7,95579 5,957,89049 341,134.10 0.82 1132343 MWD+IFR-AK-CAZ-SC 13) 13,800.59 7144 22674 6.056.28 5,985.84 -8.138.63 -7,99073 5,957,858.55 341,098.52 0.75 11,370.90 MWD+IFR-AK-CAZ-SC (3) 13,838.00 71.58 22]62 6,068.14 5,997.70 -8,162.75 -8,016]5 5,957,834.96 341,072.02 2.25 11,406.10 NOT an AcWal Survey 9 5/8" x 12.1/4" 13,873.32 71.72 22844 6.07926 6,008.82 -8,185.17 -8,041.67 5,957,813.05 341,046.65 225 11,439.29 MWD+IFR-AK-CAZ-SC(4) 13,935.17 71.38 227.82 6,098.84 6,028.40 -8,224.33 -8,065.36 5,957,774.78 341,002.19 1.10 11,497.37 MWD+IFR-AK-CAZ-SC(5) 14,026.93 71.94 226.80 6,12771 6,057.27 -8,283.39 -8,149.38 5,957717.02 340,937,00 1.22 11,583.76 MWD+IFR-AK-CAZ-SC(5) 14,121.92 69.01 225.10 6,159.46 6,089.02 -8,345.61 -8,213.73 5,957,655.10 340,871.42 3.52 11,672.79 MW0+IFR-AK-CAZ-SC(5) 14,216.96 66.32 224.82 6,195.57 6,125,13 -8,40781 -8,275.84 5,957,595.17 340,808.08 2.84 11,760.37 MWD+IFR-AK-CAZ-SC(5) 14,310.62 6661 225.14 6,232.97 6,162.53 -8,468.55 -8,336.54 5,957,535.67 340,746.18 0.44 11,845.91 MWD+IFR-AK-CAZ-SC(5) 14,40399 67.62 224.42 6,269.28 6,198.84 -8,52961 .8,397.13 5,957,475.84 340,684.38 1.29 11,931.63 MWD+IFR-AK-CAZ-SC(5) 14,498.53 68.91 223.72 6,304.29 6,233.85 -8,59271 -8,458.20 5,957,413.99 340,622.05 1.53 12.019.22 MWD+IFR-AK-CAZ-SC(5) 14,593.03 70.23 222.21 6,337.28 6,266.84 -6,657.51 -8,518.55 5,957,350.41 340,560.42 2.05 12,10766 MWD+IFR-AK-CAZ-SC(5) 14,686.36 71.31 221.48 6,368.01 6,297.57 -8,723.16 -8,577.34 5,957,285.97 340,500.33 1.37 12.19573 MWD+IFR-AK-CAZ-SC(5t 14,781.88 72.16 220.76 6,397.95 6,327.51 -6,79149 -8,636.99 5,957,218.85 340,439.33 '1.14 12,286.42 MWD+IFR-AK-CAZ-SC(5t 14,876.41 72,70 218.95 6,426.49 6,356.05 6,860.67 -8,69474 5,957,150.85 340,380.21 1.91 12,376.54 MWD+IFR-AWCAZ-SC (5) 14,970.91 72.99 217.02 6,454.37 6,383.93 -8,931.83 -8,750.31 5,957,080.82 340,323.22 1.98 12,466.77 MWD+IFR-AK-CAZ-SC(5) 10/252017 10'30:25AM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CDS-3116 actual @ 70,44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/S -E/.W Northing Easting OLS Section (usft) V) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°11001 (ft) Survey Tool Name 15,065.09 73.36 216.45 6,481.63 6.411.19 -9,004.08 -8.804.22 5,957.00967 340,267.87 0.70 12,556.77 MWD+IFR-AK-CAZ-SC(5) 15,159.35 73.29 216.91 6,508.67 6,438.23 -9,076.50 -8,858.16 5,956,938.36 340,212.49 0.47 12,646.92 MWD+IFR-AK-CAZ-SC (5) 15,253.47 73.04 216.00 6,535.93 6,465.49 -9,14895 -8911.69 5,956.867.00 340,157.53 0.96 12,735.83 MWD+1FR-AWCAZ-SC(5) 15,346.75 7327 21561 6.562.96 6,49252 -9,221.36 -8963.92 5.956,795 66 340,103.86 047 12.825.87 MWD+IFR-AK-CAZ-SC(5) 15,441.51 73.17 215.50 6,590.32 6,519.88 -9,295.17 -9,016.68 5,956,722.93 340,049.63 0.15 12,916.32 MWD+IFR-AK-CAZ-SG(5) 15.53588 73,17 216.07 6,617.64 6,547,20 -9.368.44 -9,069.49 5,956,650.74 339,995.36 0.58 13,006.45 MWD+IFR-AK-CAZ-SC(5) 15,631.21 73.56 217.00 6,644.93 6,574.49 -9,441.83 -9,123.87 5,958578.46 339,939.52 1.02 13,097.57 MWD+IFR-AK-CAZ-SC(5) 15,725.01 7375 21747 6,67133 8,600.89 -9,51349 -9,178.33 5,956.507.91 339,883.64 0.52 13,18748 MWD+IFR-AK-CAZ-SC(5) 15,81926 73.74 217.75 6,697.71 6,627.27 -9,585.17 -9,233.55 5,958437.36 339,826.99 0.29 13,277.88 MWD+IFR-AK-CAZ-SC(5) 15,91267 73.80 217.18 6,723.82 6.653.38 -9,65636 -9,288.11 5.956,36729 339,771.03 0.59 13.36748 MWD+IFR-AK-CAZ-SC(5) 16,007,80 7370 217.42 6,750.44 6,680.00 -9,729.01 -9,343.45 5,958295.77 339,71424 0.26 13,458.71 MWD+IFR-AK-CAZ-SC(5) 16,10093 7387 218.11 6,776.45 8,706.01 -9,79930 -9,39822 5,956,22620 339,65807 0.73 13.54807 MWD+IFR-AK-CAZ-SC(5) 16,195.75 73.29 219.27 6,803.25 6.732.81 -9,870.69 -9,455.07 5,956,156.36 339,599.81 1.32 13,638.99 MWD+1FR-AK-CAZ-SC(5) 16,289.36 73.20 219.43 6,830.24 6,759.80 -9,940.01 -9,51190 5,956,08821 339,541.60 0.19 13,728.62 MWD+IFR-AK-CAZ-SC(5) 16,383.76 73.38 219.47 6,857.38 6,786.94 -10,009.82 -9,569.35 5,956,01857 339,482.76 0.19 13,819.03 MWD+IFR-AK-CAZ-SC (5) 16,477.94 73.39 219.24 6,884.31 6,813.87 -10,07961 -9,626.58 5,955.950.95 339.424.15 023 13,90927 MWD+IFR-AK-CAZ-SC(5) 16,572.84 73.08 219.74 6,911.68 6841.24 -10,14973 -9,684.37 5,955,882.01 339,364.97 0.60 14,000.14 MWD+IFR-AK-CAZ-SC(5) 16,665.89 73.11 219.02 6,938.74 6,868.30 -10,218.55 4740.85 5,955,814.35 339,307.12 074 14,069.16 MWD+IFR-AK-CAZ-SC (5) 16.760.99 73.39 218.54 6,966.15 6,895.71 -10,289.54 -9,797.89 5,955.744.52 339,248.67 0.57 14,180.20 MWD+IFR-AK-CAZ-SC(5) 16,855.21 73.23 218.22 6,993.21 6,922.77 -00,360.28 -9,853.92 5,955,674.92 339,191.23 037 14,27042 MWD+IFR-AK-CAZ-SC(5) 18,94897 73.33 21808 7,020.18 8,94974 -10,430.90 -9,90939 5,955,60543 339,134.36 0.18 14,360.17 MWD+1FR-AK-CAZ-SC(5) 17,041.35 72.86 217.88 7,047.05 6,976.61 -10;500.57 -9.963.78 5,955,536.88 339,078.59 055 14,448.50 MWD+IFR-AK-CAZ-SC(5) 17,137.34 73.18 21767 7,07508 7,004.64 -10,573.13 -10,020.02 5,955,46546 339,020.91 0.39 14,540.24 MWD+IFR-AK-CAZ-SC(5) 17,233.57 7296 217.32 7,103.10 7,032.65 -10,646.17 -10,076.06 5,955,393.57 338,963.42 0.42 14,632.21 MWD+1FR-AK-CAZ-SC(5) 17,32748 73.10 216.26 7,130.51 7,060.07 -10,718.11 -10,129.85 5,955,322.73 338,908.20 109 14.721.89 MWD+IFR-AK-CAZ-SC(5) 17.421.19 7383 214.60 7,157.18 7,086.74 -10,791.30 -10,181.92 5,955,25060 338,854.67 1.87 14,811.43 MWD+IFR-AK-CAZ-SC(5) 17,516.62 7440 21375 7,183.30 7,112.86 -10,867.24 -10,233.48 5,955,17572 338,801.61 104 14,902.74 MWD+1FR-AK-CAZ-$C(5) 17,611.14 74.84 21154 7,208.37 7,137.93 -10,943.97 -10,28263 5,955,10000 338,750.92 2.30 14,993.12 MWD+IFR-AK-CAZ-SC(5) 17,703.91 75.03 209.96 7,232.49 7,162.05 -11,02096 -1D, 328.43 5,955,023.95 338,703.59 168 15.081.53 MWD+IFR-AK-CAZ-SC(5) 17,799.38 76.47 207.23 7,255.99 7,185.55 -11,10220 -10,372.71 5,954,943.63 338,657.70 3.16 15,172.22 MWD+IFR-AK-CAZ-SC(5) 17,893.13 77.03 205.26 7,277.48 7,207.04 -11.18404 -10,41306 5,954,862.61 338,615.71 2.13 15,260.85 MWD+IFR-AK-CAZ-SC(5) 17,98745 7673 202.86 7,298.89 7,228.45 -11,267.91 -10,450.51 5,954,779.52 338,576.59 2.50 15,349.18 MWD+IFR-AK-CAZ-$C (5) 18,080.82 77.68 199.48 7,319.58 7,249.14 -11,352.80 -10,483.38 5,954.695.31 338,542.03 3.67 15,435.34 MWD+IFR-AK-CAZ-SC (5) 18,175.32 79.44 196.22 7,338.33 7,267.89 -11,440.95 -10,511.76 5,954,607.75 338,511.89 3.86 15,521.11 MWD+IFR-AK-CAZ-SC (5) 18,270.13 81.03 194.25 7,35441 7,283.97 -11,531,10 -10.536.30 5,954,518.12 338,485.54 2.65 15,605.94 MWD+IFR-AK-CAZ-SC(5) 18,364.77 80.83 190.70 7,369.33 7,298.89 -11,622.33 -10,556.49 5,954,427.32 338,463.52 3.71 15,688.81 MWD+IFR-AK-CAZ-SC (5) 18,459.13 $2.07 188.59 7,38336 7,312.92 -11,714.32 -10,572.12 5,954,33567 339,446.05 2.57 15,769.32 MWD+IFR-AK-CAZ-SC(5) 18,552.86 83.26 186.04 7.395.33 7,324.89 -11,806.52 -10,583.95 5,954,243.74 338,432.37 2.98 15,847.55 MWD+IFR-AK-CAZ-SC(5) 18,647.30 64.21 184.51 7,405.64 7,335.20 -11,899.99 -10,592.58 549591150.46 338,421.87 1.90 15,924.70 MWD+IFR-AK-CAZ-SC(5) 18,74174 1M69 18177 7,414.77 7,344.33 -11,993.84 -10,597.73 5,95,05675 338,414.84 2.93 15,999.90 MWD+IFR-AK-CAZ-SC(5) 10/25/2017 10:30:25AM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CDS-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Az( TVD TVDSS +N/S +EI -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18,836.08 86.48 179.80 7,422.03 7,351.59 -12,087.88 -10,599.02 5,953,96276 338411.66 2.82 16,072.77 MWD+IFR-AK-CAZ-SC (5) 18.930.56 87.55 178.12 7,426.95 7,356.51 .12,18221 -10,597.30 5,953,868.42 338,41148 2.11 16,14393 MWD+IFR-AK-CAZ.SC(5) 19,025.04 8730 174.91 7431.20 7,360.76 -12,276.41 -10,591.57 5,953,774.13 338,415.33 3.40 16,212.40 MW0+IFR-AK-CAZ-SC(5) 19118.90 87.06 171.35 7,435.82 7,365.38 -12,369.47 -10,580.35 5,953.680.87 338.42467 3.80 16,276.48 MWD+IFR-AK-CAZ-SC(5) 19,213.16 87.12 168.06 7,44061 7.370.17 -12,462.06 -10,563.53 5,953,567.95 338,439.62 3.49 16,336.61 MWD+IFR-AK-CAZ-SC(5) 19,278.96 87.78 168.93 7,443.53 7,373.09 -12,52649 -10,550.42 5,953,523.29 338,451.44 1.66 16,377.53 MW0+IFR-AK-CAZ-SC(5) 19,333.00 8756 16886 7,445.73 7,375.29 -12.579.48 -10,540.02 5,953,470.11 338,460.77 0.42 16,411.43 NOT 90 116081 $DIVIIJI 7" x 9-7/8" 19.341.54 87.53 168.85 7,446.09 7,375.65 -12,587.85 -10,538.37 5953,461.71 338,462.25 042 16,416.79 MWD+IFR-AK-CAZ.SC(6) 19,38828 88.27 169.59 7,447.81 7,377.37 -12,633.73 -10,529.64 5,953,415.66 338.470.07 2.24 16,446.32 MWD+1FR-AK-CAZ-SC(6) 19,482.79 90.65 167.21 7,448.70 7,378.26 -12,726.29 -10,51664 5,953,322.75 338,48720 3.56 16,505.01 MWD+IFR-AK-CAZ-SC(6) 19,577.66 91.23 168.57 7,447.14 7,376.70 -12.819.4 -10,490.74 5,953,22963 338,505.23 1.56 16.563.27 MWD+IFR-AK-CAZ-SC(6) 19,672.69 91.97 171.35 7,444.49 7,374.05 -12,912.56 40,474.18 5,953,13539 338,519.91 3.03 16,624.27 MW0HFR-AK-CAZ-SC(6) 19,767.99 91.32 174.80 7,441.75 7,371.31 -13,007.12 -10,46269 5,953,041.04 338,529.49 3.68 16,689.32 MWD+IFR-AK-CAZ-SC(6) 19,963.00 91.68 175.86 7,439.26 7,368.82 -13,101.78. -10,454.96 5,952,946.25 338,535.32 1.18 16,756.86 MWD+IFR-AK-CAZ-SC (6) 19,958.18 92.12 179.08 7436.11 7,365.67 -13,196.80 -10,450,76 5.952,851.17 338,537.61 341 16,826.95 MWD+IFR-AK-CAZ-SC(6) 20,053.61 93.17 179.65 7,431.70 7,361.26 -13292.12 -10,449.71 5,952,75565 338,536.76 1.25 16,899.30 MWD+IFR-AK-CAZ-SC (6) 20,148.66 93.29 178.40 7,426.35 7,355.91 -13,387.00 -10,448.09 5,952,660.96 338,536.47 1.32 16,970.94 MWD+IFR-AK-CAZ-SC(6) 20,24402 91.22 177.02 7,422.59 7.352.15 -13.482.21 -10,444.28 5,952,565.71 338,538.36 2.61 17,04142 MWD+IFR-AK-CAZ-SC(6) 20,34024 9006 175.86 7,421.52 7,351.08 -13,578.23 -10,438.31 5,952,469.59 338,542.41 1.70 17,111.14 MWD+1FR-AK-CAZ-SC(6) 20,434.51 8924 171.59 7,422.10 7,351.66 -13,671.91 -10,42801 5,952,37573 338,550.82 4.61 17,176.29 MWD+IFR-AK-CAZ-SC(6) 20,529.42 91.47 172.93 7,42151 7,351.07 -13,765.95 -10,415.23 5,952,281.46 338,561.71 2.74 17,240.11 MWD+IFR-AK-CAZ-SC(6) 20,62533 91.51 173.16 7,419.01 7,348.57 -13,861.12 -10,403.62 5,952,186.08 338,571,41 0.24 17,305.55 MWD+1FR-AK-CAZ-SC(6) 20,720.36 91.61 17162 7,416.43 7,345.99 -13,955.27 -19391.04 5,952,091.70 338,582.10 162 17,36959 MWD+IFR-AK-CAZ-SC(6) 20,81563 88.03 169.43 7,41673 7,346.29 -14,049.22 -10,375.36 5,951,997.46 338,595.88 4.40 17,43148 MWD+IFR-AK-CAZ-SC (6) 20,911.42 88.07 16976 7,419.99 7,349.55 -14,143.38 -10,358.07 5,95190298 338,611.28 0.35 17,492.50 MWD+IFR-AK-CAZ.SC(6) 21,006.60 89.17 173.46 7,422.30 7,351.86 -14,23750 -10,344.19 5,951.80861 338,623.27 4.06 17,55567 MWD+IFR-AK-CAZ.SC(6) 21,102.40 90.56 17387 7,422.52 7,352.08 -14,332.71 -10,33362 5,951,713.22 338,631.92 151 17,621.81 MWD+IFR-AK-CAZ-SC(6) 21,197.44 87.65 17363 7,424.01 7,353.57 -14,427.16 -10,323.27 5,951618.58 338640.37 3.07 17,687.52 MWD+IFR-AK-CAZ-SC(6) 21,29222 88.32 17123 7,427.34 7,356.90 -14,521.05 -10,310.80 5,951,524.47 338,650.96 2.63 17,751.42 MWD+IFR-AK-CAZ-SC(6) 21,388.07 89.06 171.50 7,429.51 7,359.07 -14,615.79 -10.29641 5,951,42947 338,66344 0.84 17,814.75 MWD+IFR-AK-CAZ-SC(6) 21,483.22 88.71 171.18 7,431.35 7,360.91 -14,709.84 -10,28208 5,951,335.16 338,675.87 0.51 17,877.59 MWD+IFR-AK-CAZ-SC(6) 21,578.21 89.91 172.53 7,432.49 7,362.05 -14,803.86 -10,268.63 5,951,24089 338,687.44 1.90 17,940.96 MM+IFR-AK-CAZ-SC(6) 21,67331 8947 173.85 7,433.01 7,362.57 -14,89868 -10,257.30 5,951,14587 338,696.85 1.46 18,006.32 MWD+IFR-AK-CAZ-SC (6) 21,769.53 90.08 175.74 7,433.39 7,362.95 -14,994.10 -10,248.61 5,951,050.30 338,703.63 2.07 18,073.83 MWD+IFR-AK-CAZ-SC (6) 21,864.78 89.51 178.50 7,433]3 7,363.29 -15,089.22 -10,243.83 5,950,955.11 338,706.50 2.96 18,14362 MWD+IFR-AK-CAZ-SC(6) 21,95940 89.24 179.24 7,434.76 7,364.32 -15,183.82 -10,241.96 5,950,860.51 338,706.47 0.83 18,214.88 MWD+1FR-AK-CAZ-SC(6) 22,053.07 8617 177.04 7,438.02 7,367.58 -15,277.37 -10,23892 5,950,76692 338,70762 3.53 18,284.60 MWD+IFR-AK-CAZ-SC(6) 22,149.39 89.75 178.04 7,440.94 7,370.50 -15,373.54 -10,234.79 5,950,670.69 338,709.82 3.26 18,355.61 MWD+IFR-AK-CAZ-SC(6) 22,245.79 8994 176.93 7,441.20 7,37076 -15,46985 -10,230.56 5,950,574.32 338,712.12 1.17 18,426.67 MWD+IFR-AK-CAZ-SC(6) 10/252017 10,30, 25AM Page 8 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc AN TVD TVDSS +NIS +E/ -W Northing Easting DLS Section (usft) (1) (1) (usft) (usft) (usft) (usft) (ft) (ft) (-1100') (ft) Survey Tool Name 22,339.49 8957 175.21 7,44161 7,371.17 -15,563.32 -10224.14 5,950,48035 338,71666 1.88 16,494.15 MWD+IFR-AK-CAZ-SC(6) 22,435.60 90.25 171.21 7,441.76 7,371.32 -15,658.74 -10,212.78 5,950,385.13 338,726.10 4.22 18,559.94 MWD+1FR-AK-CAZ-SC (6) 22,529.38 90.13 16767 7,44145 7,371.01 -15,750.91 .10,195.60 5,950,29263 338,74143 3.78 18,619.50 MWD+1FR-AK-CAZ-SC(6) 22,624.26 90.34 166.72 7,441.06 7,37062 -15,84343 -10,174.57 5,950,19972 338,760.60 103 18,676.86 MWD+IFR-AK-CAZ-SC(6) 22,721.44 9042 167.64 7.44041 7,369.97 -15,938.19 -10,153.01 5,950,104.56 338.780.25 0.95 18,735.59 MWD+IFR-AK-CAZ-SC(6) 22,816.22 89.49 170.89 7,44049 7,370.05 -16,031.30 -10,135.35 5,95D,011. 12 338,796.03 357 18,79556 MWD+IFR-AK-CAZ-SG(6) 22,910.94 90.33 173.25 7,440.63 7,370.19 -16,125.10 -10,122.29 5,949,917.08 $38,807.21 264 18,659.03 MWD+IFR-AK-CAZ-SC(6) 23,006.09 89.65 172.49 7,440.65 7,370.21 -16,21951 -10,110.48 5.949,822.45 338,817.12 1.07 18,92376 MWD+IFR-AK-CAZ-SC(6) 23,101.43 8907 173.06 7,441.72 7.371.28 -16,314.09 -10,098.49 5,949,727.66 338,82721 0.85 18,988.50 MWD+1FR-AK-CAZ-SC(6) 23,19649 88.58 174.47 7,443.67 7,373.23 -16,408.57 -10,088.17 5,949,633.01 338,835.63 1.57 19,054.24 MWD+IFR-AK-CAZ-SC(6) 23,29144 8868 177.08 7,44594 7,375.50 -16,503.22 -10,081.17 5,949,538.23 338,84072 2.75 19,122.26 MWD+IFR-AK-CAZ-SC(6) 23,33641 89.26 176.30 7,445]4 7,376.30 -18,548.11 -10,078.58 5,949,493.31 338,842.42 2.16 19,154.7 MWD+IFR-AK-CAZ-SC (6) 23,356.49 88.61 175.46 7,447.12 7,376.68 -16,568.13 -10,077.13 5,949,473.26 338,843.46 5.29 19,169.38 MWD+1FR-AK-CAZ-SC (7) 23,452.90 89.08 177.59 7,449.06 7,3]8.62 -16,664.34 -10,071.29 5,949,376.96 338,847.37 2.26 19,239.33 MWD+IFR-AK-CAZ-SC(7) 23,547.17 84.37 174.87 7,454.45 7,384.01 -16,758.22 -10,065.11 5,949,282.99 338,85166 577 19,30727 MWD+IFR-AK-CAZ-SC(7) 23.643.19 88.27 170.36 7,460.61 7,390.17 -16,85320 -10,052.79 5,949,187.78 338,852.07 6.20 19,372.11 MWD+1FR-AK-CAZ-SC(7) 23,737.57 89.83 16538 7.462.18 7,391,74 -16,945.50 -10.033.29 5,949,095.11 338,87931 5.13 19,430.28 MWD+IFR-AK-CAZ-SC(7) 23,833.02 90.91 161.37 7,461.56 7.391.12 -17,03]03 -10,006.31 5,949,003.07 338,904.85 4.76 19,483.06 MWD+IFR-AK-CAZ-SC(7) 23,927.43 90.01 160.43 7,460.80 7,390.36 -17,126.24 -9,97542 5,948,913.27 338,93394 1.38 19,531.54 MWD+IFR-AK-CAZ-SC(7) 24,02235 88.22 157.15 7,462.27 7,391.83 -17,214.70 -9,941.09 5,948,824.14 338.966.49 3.94 19,577.24 MWD+IFR-AK-CAZ-SC(7) 24,117.76 88.26 158.20 7,465.18 7,394.74 -17,302.92 -9,904.86 5,94$73522 339,000.93 1.10 19,621.53 MWD+IFR-AK-CAZ-SC (7) 24,21306 88.22 161.54 7468.09 7,39765 -17,392.34 -9,872.09 5,948,645.16 339,031.90 3.50 19,668.96 MWD+IFR-AK-CAZ-SC(7) 24,308.86 89.72 164.30 7,469.82 7,399.38 -17,483.89 -9,843.96 5.948,553.07 339,058.19 3.28 19,721.01 MWD+IFR-AK-CAZ-SC(7) 24,404.05 93.12 167.51 ],46]46 7,397.02 -17,576.16 -9,820.79 5,948,460.36 339,079.50 4.91 19,776.80 MWD+1FR-AK-CAZ-SC(7) 24,498.93 93.15 171.13 7,462.27 7,391.83 -17,09.24 .9,80323 5,948,366.95 339,095.18 3.81 19,836.82 MWD+1FR-AK-CAZ-SC(7) 24,594.58 93.00 17430 7,457.13 7,386.69 -17,764.01 -9,791.45 5,948,271.98 339,10505 373 19,901.85 MWD+IFR-AK-CAZ-SC(7) 24,690.27 9100 176.36 7,453.79 7,383.35 -17,859.34 -9,78400 5,948,176.52 339,110.59 2.72 19,970.09 MWD+IFR-AK-CAZ-SC(7) 24,784.60 90.69 17776 7,452.40 7,381.96 -17,953.54 -9,779.16 5,948,082.26 339,113.53 1.52 20,039.13 MWD+IFR-AK-CAZ-SC(7) 24,880.30 89.56 176.18 7,452.19 7,381.75 -18,049.10 -9,774.11 5,W7 986 62 339,116.67 2.03 20,109.09 MWD+IFR-AK-CAZ-SC(7) 24,975.27 8996 179.18 7,452.59 7,382.15 -18,143.% -9,77026 5,947,89169 339,118.61 3.19 20,179.30 MWD+IFR-AK-CAZ-SC(7) 25,070.58 90.21 183.35 7452.45 7,382.01 -18,239.25 -9,772.37 5,947,796.49 339,11459 4.38 20,25363 MWD+IFR-AK-CAZ-SC(7) 25,165.14 90.26 179.52 7,452.06 7,381.62 -18,333.76 -9,774.73 5,947,70205 339.110.33 4.05 20,327.55 MWD+IFR-AK-CAZ-SC 17) 25,261.23 88.21 172.23 7,453.35 7,382.91 -18429.52 -9,767.83 5,947.60.18 339,115.31 7.88 20,396.47 MWD+IFR-AK-CAZ-SC(7) 25,356.13 91.18 166.13 7,453.85 7,383.41 -18,522.68 -9,750.02 5,947,512.69 339,131.24 7.15 20,456.39 MWD+IFR-AK-CAZ-SC(7) 25,451.31 90.12 161.35 7,452.77 ],382.33 -18,614.02 -9,723.38 5,947,420.84 339,156.04 5.14 20,509.23 MWD+IFR-AK-CAZ-SC(7) 25,547.01 89.87 163.22 7,452.78 7,382.34 -18,705.17 -9,694.26 5,947,329.12 339,183.32 1.97 20.560.35 MWD+IFR-AK-CAZ-SC(7) 25,641.0 90.65 166.56 7,452.35 7,381.91 48,70.83 -9,889.52 5,947,237.00 339,20.22 3.61 20,614.65 MWD+IFR-AK-CAZ-SC (7) 25,737.89 91.18 170.96 7,450.82 7,380.38 -18,890.88 -9.650.83 5,947,142.60 339,223.02 4.62 20,674.69 MWD+IFR-AK-CAZ-SC (7) 25,832.49 90.36 168.73 7,449.55 7,379.11 -18,983.98 -9,634.15 5,947,049.18 339.237.82 2.51 20,735.29 MWD+IFR-AK-CAZ-SC (7) 25,928.27 90.00 169.53 7,449.24 7,378.80 -19,078.04 -9,616.09 5,946,954.79 339,253.99 0.92 20,795.73 MWD+IFR-AK-CAZ-SC(7) 10/152017 10:30:25AM Page 9 COMPASS 5000.14 Build 65 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method; Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey ❑ Surface Coordinates J Declination & Convergence GRS Survey Corrections Survey at 13,873 32 is a BHI Survey C Survey Tool Codes Brandon Tem �e Digitally signed by Brandon Temple SLB DE: p Map Map Weifen Dai Vertical MD Inc Azi TVD TvDSS +N/ -S +EI -W Northing Easting DLS Section (usft) V) (°I (usft) (usft) (usft) (usft) (ft) (ft) (•1100•) (ft) Survey Tool Name 26,023.18 91.55 170.14 7,447.96 7,377.52 -19,17145 -9,599.34 5,946,861.07 339,268.86 1.76 20,856.52 MWD+IFR-AK-CAZ-SC (7) 26,118.97 91.68 173.07 7,445.26 7,374.82 -19,266.17 -9,58536 5,946,766.10 339,280.93 306 20,920.09 MWD+IFR-AK-CAZ-$C(7) 26,214.57 89.39 172.22 7,444.37 7,373.93 -19,360.97 -9,573.12 5,946,671.08 339,291.26 2.56 20,984.85 MWD+IFR-AK-CAZ-SC(7) 26,309.49 88.74 175,71 7,445.92 7,375.48 -19,455.34 -9,563.15 5,946,576.54 339,299.34 334 21,050.72 MWD+1FR-AKCAZ-SC(7) 26,405.32 88.92 179.71 7,447.87 7,377.43 -19,551.05 -9,559.32 5,946,480.77 339,301.24 4.18 21,121.59 MWD+IFR-AK-CAZ.SC(7) 26,49928 89.29 Isles 7449.34 7,378.90 -19,644.99 -9,560.47 5.946,386.88 339,298.21 2.14 21,194.28 MWD+IFR-AK-CAZ-SC(7) 26,595.41 90.80 180.49 7,44927 7,378.83 -19,741.10 -9,552.30 5,946,290.84 339,29445 2.01 21.269.08 MWD+IFR-AK-CAZ-SC(7) 26,690.77 9069 180.31 7,44803 7,377.59 -19,836.44 -9,562.96 5,W 195.53 339,291.87 0.22 21,342.55 MWD+IFR-AK-CAZ-SC (7) 26,786.18 8982 18366 7.447.60 7,377.16 -19,931.78 -9,566.27 5,946,100.28 339;28666 363 21,417.71 MWD+IFR-AK-CAZ-SC(7) 26,881.10 8929 184.73 7,448.34 7.377.90 -20,026.44 -9,573.21 5,946,005.79 339,277.81 1.26 2149469 MWD+IFR-AK-CAZSC(7) 26,975.97 9005 179.59 7.448.89 7,378.45 -20,12121 -9,576.78 5,945,911.12 339,272.34 548 21,569.58 MWD+IFR-AKCAZ-5C(7) 27,070.93 8861 176.22 7,44983 7,379.39 -20,216.09 -9,57331 5,945,81620 339,273.90 378 21,64003 MWD+IFR-AK-CAZ-SC(7) 27,165.80 8834 179.05 7,451.88 7,381.44 -20,311.84 -9,569.36 5,945,720.39 339,27593 2.95 21,710.84 MWD+IFR-AK-CAZ-SC(7) 27,262.51 87.99 177.09 7,454.61 7,384.17 -20,407.46 -9,566.14 5,945624.74 339,277.24 2.19 21,782.01 MWD+1FR-AK-CAZ-SC(7) 27,357.49 88.38 174.94 7,457.62 7,387.18 -20,502.15 -9,559.54 5,945,529.93 339,281.93 2.30 21,850.31 MWD+IFR-AK-CAZ-SC(7) 21452.40 86.58 171.42 7.461.80 7,391.36 -20,596.28 -9,548.28 5,945,435.61 339,291.29 4.16 21,915.19 MWD+IFR-AK-CAZ-SC(7) 27,547.54 88.11 167.00 7,466.20 7,395.76 -20,669.61 -9,530.49 5.945,341.94 339,307.20 4.91 21,975.25 MWD+IFR-AK-CAZ-SC(7) 27,643.36 8940 163.50 7,468.29 7,397.85 -20,782.24 -9,506.11 5,945,24886 339,329.72 3.89 22,030.53 MWD+IFR-AKCAZ-SC(7) 27,738.41 88.99 165.86 7,469.62 7,399.18 -2D, 873.89 .9,481 00 5,945.15672 339,352.99 2.52 22,084.60 MWD+IFR-AK-CAZ-SC(7) 27,778.00 88.99 165.86 7,470.32 7,39988 -20,912.28 -9,471.33 5,945,118.15 339,361.88 0.00 22,107.79 NDTaaActuld$lgrey 4-112' x 6-314" 27,798.00 88.99 165.86 7,470.67 7,40).23 -20,931.67 -9,46644 5,945,098.67 339,366.38 000 22,119.50 PROJECTED to TO rinal Definitive Survey Verified and Signed-nff All targets and/or well position objectives have been achieved. ❑ Yes ❑ No 1 have checked to the best of my ability that the following data is correct: ❑ Surface Coordinates J Declination & Convergence GRS Survey Corrections Survey at 13,873 32 is a BHI Survey C Survey Tool Codes Brandon Tem �e Digitally signed by Brandon Temple SLB DE: p Date: 2017.10.2510:57:10-08'00' Weifen Dai Digital signed by Weifeng Wi Client Representative. 9 Date 2017.102613Q7M-080' Date. 10125117 7 0/2 52 01 7 f 0, 30:25AM .Page 10 COMPASS 5000.14 Build 85 RECEIVED OCT 3 0 2017 FINAL AOGCC ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CDS-316 CD5-316 ConocoPhillips Definitive Survey Report 24 October, 2017 21 7040 28 75 8 ConocoPhillips Company: ConomPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316 Design: CD5-316 ConocclPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 'roject Western North Slope, North Slope Alaska, United States nap System: US State Plane 1983 System Datum: Mean Sea Level :eo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Well CD5-316 Audit Notes: To Well Position +N/ -S 0.00 usft Northing: 5,965,580.48 usft Latitude: 70° 18' 48.300 N 13,873.32 +El -W 0.00 usft Easdng: 1,489,283.58 usft Longitude: 151° 13'29,757 W Position Uncertainty (usft) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft 0.00 220.00 13,873.32 13,873.32 CD5-316PB7 Srvy 1-BHI_MWD+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/12/2017 144: Wellbore CD5-316 MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/29/2017 9:38: 19,341.54 23,336.41 CD5-316 Srvy 5-SLB_MWD+GMAG(C Magnetics Model Name 9/13/2017 1011 Sample Date Declination Dip Angle Field Strength 9/18/2017 9:02: -0.28 5,965,580.70 1,489,283.30 P) 0 (nT) 0.58 BGGM2017 9/5/2017 17.00 80.79 57,450 Design CD5-316 Date 9/27/2017 Audit Notes: To Map Map Version: 1.0 Phase: ACTUAL Tie On Depth: 13,873.32 Vertical Section: Depth From (TVD) +N/ -S +EI -W Direction 1,133.92 (usft) (usft) (usft) V) 2,386.06 36.44 0.00 0.00 220.00 Survey Program Date 9/27/2017 From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 98.80 1,076.25 CD5-316 Spry 1 - SLB_GWD70 (CD5-31 GYD-GC-SS Gyrodata gyro single shots 7/25/2017 10:27 1,133.92 2,289.67 CD5-316 Srvy 2 -SLB MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/25/201710:29 2,386.06 13,800.59 CD5-316 Srvy 3- SLB_ MWD _GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/30/201710:19 13,873.32 13,873.32 CD5-316PB7 Srvy 1-BHI_MWD+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/12/2017 144: 13,935.17 19,278.96 CD5-316 Srvy 4- SLB _MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/29/2017 9:38: 19,341.54 23,336.41 CD5-316 Srvy 5-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 9/13/2017 1011 23,356.49 27,738.41 CD5-316 Srvy 6-SLB_MWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 9/18/2017 9:02: Survey 1024@017 2:37:22PM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Seating DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.44 0.00 0.00 3644 -34.00 0.00 0.00 5,965,58048 1,489,283.58 0.00 000 UNDEFINED 98.80 0.65 306.44 98.80 28.35 0.21 -0.28 5,965,580.70 1,489,283.30 1.04 0.02 GYD-GC-SS 1 115.50 0.58 299.53 115.50 45.M 0.31 -0.43 5,965,58080 1,489,283.15 0.61 004 NOT an Aetuel Survey 20" 150.56 0.47 279.10 150.56 80.12 0.42 -073 5,965,580.91 1,489,28286 061 0.15 GYD-GC-SS(1) 245.62 0.76 217.62 245.61 175.17 -0.02 -1.50 5,965,580.49 1,489,282.08 0.71 0.98 GYD-GC-SS(1) 335.79 1.74 206.74 33518 265.32 -172 -248 5,965,578.81 1,489,281.06 1.11 2.91 GYD-GC-SS(1) 427.34 3.20 208.74 427.22 356.78 -5.20 -4.34 5,965,575.37 1,489.279.14 1.60 6.77 GYD-GC-SS (1) 519.79 3.76 20076 519.50 449.06 -10.28 -6.65 5,965,570.32 1,489,276.72 0.80 12,16 GYD-GC-SS(1) 1024@017 2:37:22PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usR (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +El -W Northing Easting DLS Section just) (°I V) (usft) (usft) (usft) jusft) ift) (ft) (°/IGO.) (ft) Survey Tool Name 611.07 409 20045 610.57 540.13 -16.14 -8.85 51965,56452 1,489,274.41 036 18.05 GYD-GC-SS(1) 704.45 6.44 205.35 703.55 633.11 -24.00 -12.25 5,965,55674 1,489,270.85 2.56 26.26 GYD-GC-SS(1) 798.21 871 21765 796.49 726.05 -34.37 -1884 5.965,546.50 1.489,264.05 2.96 38.44 GYD-GC-SS(1) 886.96 1041 22002 884.00 813.56 45.83 -28.11 5,965,53522 1489,254.56 1.97 53.18 GYD-GC-SS(1) 980.35 1309 219.37 975.43 904.99 -6047 -40.24 5,965,520.83 1,489,242.13 2.87 72.19 GYD-GC-SS(1) 1,076.25 14.64 218.95 1,068.53 998.09 -78.30 -5475 5,965,503.31 1,489,227.27 1.62 95.17 GYD-GC-SS (1) 1,133.92 15.05 217.25 1,124.28 1,053.84 -89.92 -63.86 5.965.491.87 1,489,217.92 1.04 109.94 MWD+IFR-AK-CAZ-SC (2) 1,22842 17.38 216.17 1,21501 1,144.57 -111.09 -79.62 5,965,471.03 7489,201.74 2.49 136.28 MWD+IFR-AK-CAZ-SC(2) 1,322.21 20.22 214.80 1.303.79 1,233.35 -135.71 -97.14 5,965,446.76 1,489,183.73 3.06 166.40 MWD+IFR-AK-CAZ-SC (2) 1416.81 22.32 213.82 1,391.94 1321.50 -164.06 -116.47 5,965,41881 1,489,163.84 2.25 200.54 MWD+1FR-AK-CAZ-SC(2) 1,511.00 25.02 211.11 1,478.20 1,407.76 -195.98 -136.72 5.965,387 31 1,489,142.95 3.09 238.01 MWD+IFR-AK-CAZ-SC(2) 1,605.89 2TM 210.76 1,563.38 1492.94 -231.84 -158.21 5.965,351 89 1489,12075 2.37 279.29 MWD+IFR-AK-CAZ-SC(2) 1,700.39 29.85 21065 1,646.38 1,575.94 -270.67 -18127 5,965,313.53 1,489,096.91 2.74 323.87 MWD+IFR-AK-CAZ-SC(2) 1.79472 31.79 211.13 1,727.38 1656.94 -312.14 -206.09 5,965,272.57 1,489,071.27 2.07 371.59 MWD+IFR-AK-CAZ-SC(2) 1,888.64 31.72 211.24 1,807.24 1,736.80 -354.43 -231.68 5,965,230.81 1,489,044.83 0.10 420,43 MWD+IFR-AK-CAZ-SC(2) 1,983.09 34.92 211.36 1,886.16 1,815.72 -39875 -258.63 5,965,18704 1,469,016.99 3.39 471.71 MWD+1FR-AK-CAZ-8C(2) 2,077.54 38.08 212.07 1,962.07 1,891.63 -446.53 -288.17 5,985,13987 1488,986.50 3.38 527.30 MWD+IFR-AK-CAZ-SC(2) 2,172.54 39.77 214.71 2,035.98 1,965.54 496.34 -321.04 5,965,090.74 1488,95264 2.49 586.58 MWD+IFR-AK-CAZ-SC(2) 2,267.09 41.58 217.53 2,107.69 2,037.25 -546.09 -357.38 5,965,04173 1.486.915.31 2.73 648.05 MWD+IFR-AK-CAZ-SC(2) 2,28967 4228 216.89 2,12449 2,054.05 -558.11 -366.50 5.965,029.90 1,488,905.95 363 663.12 MWD+IFR-AK-CAZ-SC(2) 2,360.00 42.36 217.87 2,176.50 2,106.06 -595.74 -395.24 5,964,99286 1,488,87845 0.94 710.42 NOT eD AttW SYle6y 13 3/8" z 16" 2,386.06 42.39 218.23 2,195.75 2,125.31 -809.57 -406.07 5,96,97925 1,488,865.35 094 727.97 MWD+IFR-AK-CAZ-SC(3) 2,452.08 43.15 218.86 2,244.21 2,173.77 -644.63 -434.01 5,964,944.76 1 488,836.72 1.32 772.79 MWD+IFR-AK-CAZ-SC (3) 2,547.72 46.71 21849 .2.311.91 2,241.47 -69.36 -476.20 5,964,892.90 1,488,793.47 373 84030 MWD+IFR-AK-CAZ-SC(3) 2,641.16 48.40 219.76 2,374.97 130453 -750.84 -519.72 5964,840.31 1,488,74889 2.07 909.24 MWD+IFR-AK-CAZ-SC i3) 2,735.35 51.15 220.19 2,435.79 2.365.35 -805.94 -585.92 5,984786.15 1,488,701.60 2.94 981.15 MWD+IFR-AK-CAZ-SC(3) 2,829.83 5368 221.57 2,493.42 2,422.98 -862.53 -614.93 5,964,730.57 1,488.65146 2.92 1,055.00 MWD+IFR-AWCAZ-SC(3) 2,924.19 55.90 224.14 2,547.82 2,477.38 -919.02 -667.37 5,9U,675 15 1,488,597.90 3.24 1,132.99 MWD+IFR-AK-CAZ-SC(3) 3,018.35 58.10 225.51 2,599.11 2,528.67 -97502 -723.04 5,96,620.29 1,488,541.11 2.64 1,211.67 MWD+IFR-AK-CAZ-SC(3) 3,110.07 60.11 226.51 2,646.20 2,575.76 -1,029.67 -779.67 5,9U,566 79 148848340 2.38 1,289.93 MWD+IFR-AK-CAZ-SC(3) 3,202.95 62.28 226.86 2,690.95 2,620.51 -1,085.50 -838.88 5,964,512.17 1488,423.08 2.36 1,370.76 MWD+IFR-AK-CAZ-SC(3) 3,298.68 64.25 227.52 2,734.01 2,863.57 -1,143.59 -901.60 5,964,455.35 1488,35021 2.15 1,455.58 MWD+IFR-AK-CAZ-SC(3) 3,390.58 66.82 229.53 2,772.07 2,701.63 -1,198.97 -964,28 5,964.401,25 1,488,295.44 343 1,538.29 MWD+1FR-AK-CAZ-SC(3) 3,485.15 69:03 229.99 2,807.59 2,737.15 -1,255.59 -1,031.18 5,964,346.00 1,488,227.41 2.41 1,62465 MWD+IFR-AK-CAZ-$C(3) 3,57971 69.67 22904 2,840.91 2,770.47 -1,313.04 -1,09848 5,96,289.91 1,488,158.97 1.14 1711.94 MWD+IFR-AK-CAZ-SC(3) 3,67345 70.78 22863 2,87263 2.802.19 -1,371.10 -1,164.89 5,964,233.20 1,488,091.42 1.25 1,799.10 MWD+IFR-AK-CAZ-SC(3) 3,764.64 7203. 228.00 2,90171 2,831.27 -1,428.58 -1,229.43 5,964,17704 1,488,025.73 1.52 1,884.62 MWD+IFR-AK-CAZ-SC (3) 3,85896 71,97 226.95 2,930.85 2,86041 -1,489.21 -1,295.54 5,964,117.76 1,487,958.42 1.06 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3,953.82 72.25 225.76 2,959.99 2,889.55 -1,551.52 -1,360.86 5,964,056.78 1,487,89186 1.23 2,063.28 MWD+1FR-AK-CAZ-SC(3) 10242017 2:37:22PM Page 3 COMPASS 5000 14 Build 85 ConocoPhillips Definitive Survey Report Company: ConomPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey 101242017 2:37.22PM Page 4 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc AN TVD TVDSS +NAS +E1 -W Northing Easting DLS Section (usft) (°) (") (usft) (usft) (uslt) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,047.32 72.60 224.30 2,98823 2,917.79 -1,614.51 -1,423.92 5,963,99507 1487.827.56 1.53 2,15207 MWD+IFR-AK-CAZ-SC(3) 4,141.31 72.55 223.34 3,016.38 2,94594 -1.679.21 -1,486.01 5,963,931.64 1,487,764.18 0.98 2,241-54 MWD+IFR-AK-CAZ-SC(3) 4,235.41 72.68 223.08 3,04439 2,974.35 -1,745.36 -1,548.15 5,963.866.76 1,487,700.73 0.29 2,332.16 MWD+IFR-AK-CAZ-SC(3) 4,330.72 72.54 223.28 3,072.98 3,002.54 -1,810.99 -1,60974 5,963,802.39 1487,637.84 0.25 2,422.02 MWD+IFR-AK-CAZ-SC(3) 4,423.63 72.56 223.72 3,100.84 3,030.40 -1,875.28 -1,67035 5,963,739.34 1,487,575.55 0.45 2,510.49 MWD+IFR-AK-CAZ-SC (3) 4,517.57 72.58 224.24 3,128.98 3,05854 -1,939.78 -1,732.99 5963,676.12 1487,51203 0.53 2,599.90 MWD+IFR-AK-CAZ-SC(3) 4,612.69 72.58 22364 3,15745 3,087.01 -2,005.13 -1,795.% 5,963,612.06 1,487,447.76 0.60 2,89644 MWD+IFR-AK-CAZ-SC(3) 4,705.14 72.60 224.42 3,185.12 3,11468 -2,068.55 -1,857.27 5,963,54988 1,487,38519 0.81 2,778.43 MWD+IFR-AK-CAZSC(3) 4,798.99 72.07 224.13 3,213.59 3,143.15 -2,132.58 -1,919.70 5.983.487.13 1,487,321.49 0,64 2,867.61 MWD+IFR-AK-CAZ-SC(3) 4,894.64 71.59 224.49 3,243.42 3,17298 -2,197.61 -1,983.18 5,963,423.40 1,487,25671 0.62 2,958.23 MWD+IFR-AK-CAZ-SC(3) 4,989.18 71.53 225.26 3,273.33 3,202.89 -2,261.16 -2,046.46 5,963,361.13 1.487,192.17 0,78 3,047.59 MWD+IFR-AK-CAZ-SC(3) 5,083.50 71.53 225.44 3,303.21 3,23217 -2,324.04 -2,110.11 5,963,299.56 1487,12728 0.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 5,178.53 71.55 225.79 3,333.29 3,262.85 -2,387.09 -2,174.53 5,963,23782 1487,06161 0.35 3,226.38 MWD+IFR-AK-CAZ-SC(3) 5,2]2.95 71.57 226.43 3,363.15 3,29211 -2,449.19 -2.239.08 5,963,177.04 1486,99582 0.64 3,31544 MWD+IFR-AK-CAZ-SC(3) 5,366.45 71.53 225.95 3,392.74 3,322.30 -2,510.59 -2,303.09 5.983,116.94 1,486,930.60 0.49 3,403.62 MWD+IFR-AK-CAZ-SC(3) 5,461.40 71.56 225.48 3,422.80 3,352.36 -2,57347 -2,367.56 5,963.055.3] 1,486,864.87 0.47 3493.24 MWD+IFR-AK-CAZ-SC(3) 5,555.27 71.56 225.52 3,45249 3,38205 -2.635.89 -2,431.08 5,962,994.25 1,486,800.12 0.04 3,581.88 MW0+IFR-AK-CAZ-SC 13) 5.649.96 71.56 225.23 3,48244 3,412.00 -2,698.99 -2,495.01 5,962,932.45 1,486,734.94 0.29 3,671.31 MWD+IFR-AK-CAZ-SC(3) 5,744.30 71.57 225.19 3,512.27 3,441.83 -2,762.04 -2,558.53 5,952,870.70 1,486,670.17 0.04 3,760.44 MWD+IFR-AK-CAZ-SC(3) 5,83837 7153 225.67 3.542.17 3,471.73 -2,824.93 -2,622.37 5,962,809.11 1,486,60508 648 3,84965 MWD+IFR-AK-CAZ-SC(3) 5,933.26 71.50 225.31 3,572.13 3,501.69 -2,88736 -2,686.27 5,962,747.59 1,486,53993 0.36 3.938.85 MWD+IFR-AK-CAZ-SC(3) 6,027.10 71.57 225.81 3,601.85 3,531.41 -2,950.08 -2,74983 5,962,686.57 1,486,475.14 0.51 4,027.44 MWD+IFR-AK-CAZ-SC(3) 6,12092 71.56 224.80 3,631.52 3,561.08 -3,012.68 -2,813.09 5,962,62526 1,486,410.63 102 4,116.07 MWD+IFR-AK-CAZ-SC(3) 6,214.35 71.53 224.80 3661.10 3,590.66 -3,075.56 -2,875.54 5,962,563.85 1,486,346.93 0.03 4,204.38 MW13+1FR-AK-CAZ-SC(3) 6,308.67 71.56 224.24 3,690.96 3,620.52 -3,139.35 -2,93828 5,962,501.13 1,486,282.93 0.56 4,293.57 MWD+IFR-AK-CAZ-SC(3) 6,402.34 71.63 224.69 3,720.53 3,650.09 -3,202.78 -3,000.53 5,982,438.97 1486,21941 646 4,382.18 MWD+IFR-AK-CAZ-SC(3) 6,497.20 7140 22447 3,750.61 3,680.17 -3,266.86 -3,06368 5,962,376.18 1,486,1 54 99 0.33 4,471.88 MWD+IFR-AK-CAZ-SC(3) 6,591.37 71.57 224.87 3,780.51 3,710.07 -3,330.37 -3,12646 5,962,313.96 1,486,09096 0.44 4,560.86 MWD+IFR-AK-CAZ-SC(3) 6,684.55 71.51 225.26 3,810.02 3,739.58 -3,392.80 -3,189.02 5,962,25281 1486,027.15 0.40 4,646.90 MWD+IFR-AK-CAZ-SC(3) 6,778.69 7144 224.85 3,839.93 3,769.49 -3,455.85 -3,252.20 5,962,191.04 1,485,962.72 0.42 4,737.81 MWD+IFR-AK-CAZ-SC (3) 6,873.27 71.44 224.69 3,87603 3,799.59 -3,519.51 -3,315.35 5,962,128.68 1,485,898.31 0.16 4,827.16 MWD+IFR-AK-CAZ-SC (3) 6,966.71 71.51 225.08 3,899.72 3,829.28 -3,582.28 -3,377.87 5,962,067.18 1,485,834.54 0.40 4,915.44 MWD+IFR-AK-CAZ-SC (3) 7,06141 71.50 225.09 3,92916 3,859.32 -3,645.69 -3.441.47 5,962,005.07 1,485,76968 0.01 5,004.89 MWD+IFR-AK-CAZ-SC(3) 7,155.57 71.47 225.07 3,95966 3,889.22 -3,708.74 -350489 5,961,943.31 1,485,705.21 0.04 5,093.83 MWD+IFR-AK-CAZ-SC(3) 7,251.39 71.42 225.05 3,990.15 3,91931 -3,772.90 -3,568.99 5,951,880.46 1,485,639.64 0.06 5,184.32 MWD+IFR-AK-CAZ-SC(3) 7,346.55 72.03 22548 4,019.99 3,949.55 -3,836.50 -3,633.18 5,981,818.17 1485,574.18 0.77 5,274.29 MWD+IFR-AK-CAZ-SC(3) 7,438.01 71.98 224.44 4,048.25 3,977.81 -3,898.05 -3,694.65 5,961,75787 1,485,511.50 108 5,360.95 MWD+IFR-AK-CAZ-SC(3) 7,532.62 71.96 224.60 4,077.53 4007,09 -3,962.20 -3,757.73 5,961,69501 1,485,447.15 0.16 5,450.64 MWD+IFR-AK-CAZ-SC (3) 7,626.80 71.99 224.89 4,106.67 4,035.23 -4,02580 -3,820.77 5,961,632.69 1,485,382.84 0.29 5.539.89 MWD+IFR-AK-CAZ-SC(3) 7,720.69 71.99 224.97 4,135.70 4,065.26 -4,089.02 -3,883.83 5,961,570.76 1,485,318.52 0.08 5,528.85 MWD+IFR-AK-CAZ-SC (3) 101242017 2:37.22PM Page 4 COMPASS 5000.14 Build 85 Company: ConocoPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316 Design: CD5-316 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Survey Map Map vertical MD Inc AN TVD TVDSS +N1S +E/ -W Northing Easting DLS Section (usft) (°) (I (usft) (usft) (usft) (usft) (ft) (ft) (-/100-) (ft) Survey Tool Name 7,81461 72.01 225.63 4,164.73 4,094.29 4,151.85 -3,947.32 5,961,509.23 1,485,253.79 0.67 5.71779 MWD+IFR-AK-CAZ-SC(3) ],907.83 7202 226.60 4,193.51 4,12307 4,213.31 -4,011.22 5,96144907 1,485,188.66 0.99 5,805.95 MWD+IFR-AK-CAZ-SC (3) 8,00123 71.98 22592 4,222.37 4,151.93 -4,274.72 -4,075.40 5,961,388.97 1,485,123.27 0.69 5,894.25 MWD+IFR-AK-CAZ-SC(3) 8,095.52 71.84 225.57 4,251.65 4,181.21 -4,337.27 -4,139.60 5,961,327.73 1,485,057.83 0.38 5,983.42 MWD+IFR-AK-CAZ-SC(3) 8,190.64 71.52 225.34 4,281.55 4,211.11 -4,400.61 -4,203.95 5,961,265.70 1,484,99222 0.41 6,073.31 MWD+IFR-AK-CAZ-SC(3) 8,283.93 71.50 22547 4,311.13 4,240.69 4,46273 4,266.95 5,961,204.87 1,484,927.98 0.13 6,161.40 MWD+IFR-AK-CAZ-SC(3) 8,378.39 71.47 226.52 4,341.13 4,270.69 -4,524.96 4,331.38 5,961,143.95 1,484,862.32 1.05 6,25047 MWD+IFR-AK-CAZ-SC(3) 8,472.66 7144 227.46 4,371.11 4,300.67 .4,585.92 -4,396,73 5,961,08432 1,484,79576 0.95 6,339.18 MM+IFR-AK-CAZ-SC (3) 8,566.86 71.41 227.16 4,401.12 4,330.68 -4,64646 -4,462.37 5,961,025.12 1,484,728.93 0.30 6,427.75 MWD+IFR-AK-CAZ-SC(3) 8,661.19 71.83 227.01 4,43102 4,360.58 4,707.38 4,527,89 5,960,96553 1,484,66220 028 6,516.53 MWD+IFR-AK-CAZ-SC(3) 8,75541 71.57 225.59 4,460.76 4,390.32 -4769.15 4,592.52 5,960,905.09 1,484,596.34 1.43 6,605.39 MWD+IFR-AK-CAZ-SC (3) 8,849.96 71.47 225.07 4,49073 4,420.29 -4,832.19 4,656.29 5,9 ,84335 1484,531.32 0.53 6,694.68 MWD+IFR-AK-CAZ-SC(3) 8,94368 71.41 224.71 4,520.56 4,450.12 -4,895.13 -4.71900 5,960,781.68 1.484,467.36 0.37 6,783.20 MWD+IFR-AK-CAZ-SC(3) 9,037.62 71.48 224.88 4,550.46 4,480.02 -4,958.33 -4,781]4 5,960,71976 148440336 0.19 6,871.95 MWD+1FR-AK-CAZ-SC(3) 9,13163 71.47 225.66 4,580.33 4,509.89 -5,021.06 -4,845.07 5,960,658.32 1,484,338,79 0.79 6,960.71 MWD+IFR-AK-CAZ-SC(3) 9,226.41 71.54 226.20 4,610.39 4,539.95 -5,083.5B 4,909.65 5,960,597.12 1484,272.97 0.55 7,050.11 MWD+IFR4K-CAZ-SC(3) 9,32096 7147 226.69 4,640.39 4.569.95 -5,145.37 -4,974.63 5,960,536.66 1,484,206.76 0.50 7,139.21 MWD+IFR-AK-CAZ-SC 13) 9,416.14 71.54 227.20 4,670.58 4,600.14 -5,20.99 -5.040.59 5,960,476.38 1.484,139.58 0.51 7,228.81 MWD+IFR-AK-CAZ-SC (3) 9,509.75 71.54 226.36 4,700.22 4,629.78 -5,267.79 -5,105.29 5,960.416.90 1,484.073.67 0.85 7,316.98 MWD+IFR-AK-CAZ-SC(3) 9,604.30 71.47 226.05 4,730.21 4,659.77 -5,329.85 -5,170.02 5.960,356.16 1,484,007.72 0.32 7,40,13 MWD+IFR-AK-CAZ-SC(3) 9,698.73 71.53 225.47 4,760.18 4,689.74 -5,392.33 -5,234.17 5,960.29500 1,483,942.32 0.59 7,495.22 MWD+IFR-AK-CAZ-SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 -5.45541 .5,297.76 5,960,233.21 1,483,877.48 0.48 7,584.42 MWD+IFR-AK-CAZ-SC(3) 9,B88.23 7151 224.84 4,820.26 4,749.82 -5,519.25 -5,36142 5,960,170.67 1483,812.56 0.15 7,674.24 MWD+IFR-AK-CAZ-SC 13) 9,98140 7147 224.70 4,849.84 4,779.40 -5,581.97 -5,423.64 5,960,109.21 1,483,749.09 0.15 7,762.29 MWD+IFR-AK-CAZ.SC(3) 10,075.46 71 54 225.61 4,879.6B 4,80924 -5,644.88 -5,486.88 5,960,047,60 1,483,684.60 0.92 7,851.13 MWD+IFR-AK-CAZ-SC(3) 10,169.70 71.48 225.41 4,90.56 4,839.12 -5,70751 -5,550.64 5,959,98627 1,483,61960 0.21 7,940.09 MWD+IFR-AK-CAZ-SC(3) 10,261.84 71.54 22524 4,938.79 4,868.35 -5.768.95 -5,61278 5,959,926.10 1,483,556.24 0.19 8,027.09 MW0+IFR-AK-CAZ-S0(3) 10,354.14 7144 223.92 4,968.01 4,897.57 -5,831.31 -5,674.23 5,959,864.99 1483,493.55 1.36 8,114.36 MWD+IFR-AK-CAZ-SC (3) 10,44848 71.51 223.01 4,997.91 4,927.47 -5,896.25 -5,735.78 5,959,801.31 1,483,430.71 0.92 8,20368 MWD+IFR-AK-CAZ-SC(3) 10,54293 71 44 223:34 5,027.92 4,95].48 -5,961.55 -5,797.0 5,959,73725 1,483,366.14 0.34 8,293.10 MWD+IFR-AK-CAZ-SC(3) 10,637.66 71.44 222.95 5,058.07 4,96763 6,027.08 -5,858.47 5,959,672.98 1,483,305.42 0.39 8,382.76 MWD+IFR-AK-CAZ-SC(3) 10,732.15 71.54 223.40 5,088.07 5,017.63 -6,092.42 -5,919.78 5,959,608.89 1,483,24282 0.46 8,472.23 MWD+IFR-AK-CAZ-$C(3) 10,826.66 7147 223.51 5,118.05 5,047.61 .6J57 49 -5,981.42 5,959,545.09 1.483,179 88 0.13 8,561.69 MWD+IFR-AK-CAZ-SC(3) 10,920.49 71.51 224.37 5,147.84 5,077.40 -6,22155 -6,043.16 5,959,48228 1,483,116.87 0.87 8,650.46 MWD+IFR-AK-CAZ-SC(3) 11,015.80 71.57 225.09 5,178.02 5,107.58 -6,285.78 -6,106.79 5.959,419.35 1,483,051.97 072 8.740.55 MWD+IFR-AK-CAZ-SC(3) 11,110.71 71.54 225.23 5,20.05 5,137.61 6.349.27 6,170.63 5,959,35717 1,482,986.86 0.14 8,830.22 MWD+IFR-AK-CAZ-SC(3) 11,204.34 71.51 225.98 5,237.72 5,16728 6,411.39 6,234.08 5,959,296.34 1.48292218 076 8,918.60 MWD+IFR-AK-CAZ-SC (3) 11,298.22 71.51 225.54 5,26749 5,197.05 6,473.51 -6,297.87 5,959,235.52 1,462,857.16 0.44 9,007.19 MWD+1FR-AK-CAZ-SC(3) 11,392.43 71,47 226.35 5,297.40 5,226.96 -6,535.63 -6,362.07 5,959,174.71 1,482,791.72 0.82 909804 MWD+IFR-AK-CAZ-$C(3) 11,486.64 71.57 226.81 5,327.26 5.256.82 6,597.04 6,426.97 5,959,11462 1,482,72561 0.48 9,184.81 MWD+IFR-AK-CAZ-SC(3) 10/242017 2:37:22PM Page 5 COMPASS 5000.14 Build 85 Company: ConomPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316 Design: CD5-316 Survey ConoccPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Map Map Vertical MD Inc Azi TVD TVDSS -NAS +E1 -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,581.31 71.51 225.71 5,357.24 5,285.80 -6,659.13 -6491.85 5,959,053.86 1,482,659.50 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11,675.58 71.54 226.01 5,387.11 5,316.67 -6,72140 -6,556.01 5,958.992.90 1,482,594.10 0.30 9,363.01 MWD+1FR-AK-CAZ-SC 13) 11,769.70 71.45 22805 5,416.98 5,346.54 -6,783.35 -6,620.25 5,958,932.24 1,482,52863 0.10 9,45177 MWD+IFR-AK-CAZ-SC(3) 11,864.23 71.54 226.31 5,446.99 5,376.55 6,845.43 -6684.93 5,958,871.49 1482,46272 028 9,540.89 MWD+IFR-AK-CAZ-SC(3) 11,957.80 71.51 225.67 5,476.64 5,406.20 -6,907.09 6,74876 5,958.811.14 1482,397,67 0.65 9,629.15 MWD+IFR-AK-CAZ-SC(3) 12,052.51 71.56 228.14 5.506.64 5,436.20 -6,969.60 -6,813.27 5,958,749.94 1,482,331.91 0.47 9,718.51 MWD+IFR-AK-CAZ-SC(3) 12,146.60 71.54 225.89 5,536.41 5,465.97 -7,031.59 -6,87749 5,958,689.27 1482,26646 0.25 9,807.27 MWD+IFR-AK-CAZ-SC(3) 12,24151 71.53 22534 5,566.47 5,496.03 -7,094.55 -6941.83 5,958,62761 1,482,200.68 0.55 9,896.87 MWD+1FR-AK-CAZ-SC(3) 12,335.11 71.57 22541 5,596.10 5,525.66 -7,156.93 -7,005.02 5.958,565 53 1,482,13645 0.08 9,985.26 MWDHFR-AK-CAZ-SC(3) 12,42997 71.56 225.27 5,626.09 5,555.65 -7,220.18 -7,069.03 5,958.504.58 1,482,071.18 0.14 10,074.87 MWD+IFR-AK-CAZ-SC(3) 12,523.83 71.47 224.14 5,655.85 5,585.41 -7,283.45 4,131.65 5,958,442.59 1,482,007.31 1.15 10,16358 MWD+IFR-AK-CAZ-SC(3) 12,618.97 71.51 224.02 5,686.06 5,615.62 -7,348.26 -7.194.41 5,958,379.06 1.481,943.26 0.13 10,253.57 MWD+IFR-AK-CAZ-8C (3) 12,711.50 71.54 224.33 5,715.38 5.644.94 -7,41120 -7,255.57 5,958,317.35 1,48188085 0.32 10,341.10 MWD+IFR-AK-CAZ-SC(3) 12,806.89 71.65 224.34 5,745.50 5,675.06 -7,475.94 -7,318.82 5,958,253.92 1,481,816.31 0.12 10,431.35 MWD+IFR-AK-CAZ-SC(3) 12,901.29 72.05 224.84 5,774.90 5,704.46 -7.539.82 .7,381.80 5,958,191.32 1,481,752.07 0.66 10,520.77 MWD+IFR-AK-CAZ-SC(3) 12,995.80 71.98 22441 5,804.09 5,733.65 -7,603.80 -7,444.94 5.958.128 63 1,461,687.65 044 10,610.36 MWD+IFR-AK-CAZ-SC(3) 13,090.91 71.99 224.79 5,833.50 5.763.06 -7,668.20 -7,508.45 5,958,065.53 1,481,62287 0.38 10,700.52 MWD+1FR-AK-CAZ-SC(3) 13,184.41 71.93 224.60 5,882.45 5,792.01 -7,731.40 -7,570.98 5,95600361 1,481,559.08 020 10,789.13 MWD+IFR-AK-CAZ-5C(3) 13,279.48 71.90 224.71 5.891.97 5,821.53 -7,795.66 -7,634.50 5,957,940.61 1,481,494.29 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,373.83 7204. 225.41 5,921.17 5,850.73 .7,859.06 -7,698.00 5,957,878.54 1,481 429.53 0.72 10,968.57 MWD+IFR-AK-CAZ-SC (3) 13.46820 71.50 225.44 5,950.69 5,880.25 -7,921.97 -7,761.85 5,957.816.93 1,481,364.43 0.57 11,057.80 MWD+1FR-AK-CAZ-SC(3) 13,562.30 71.51 226.89 5,980.54 5,910.10 -7,983.77 -7,826.22 5,957,75644 1,481.29883 1.46 11,146.52 MWD+IFR-AK-CAZ-SC(3) 13,656.37 71.47 226.33 6,01041 5,939.97 -8,045.05 -7,891.04 5,957,696.48 1,481,232.79 0.57 11,235.13 MWD+IFR-AK-CAZ-8C(3) 13,750.15 71.45 227.14 6,04023 5,96979 -8,105.99 -7,955.79 5,957,636.86 1,481,166.84 0.82 11,323.43 MWD+IFR-AK-CAZ-SC(3) 13,800.59 7144 226.74 6,056.28 5,985.84 -8,13863 -7,990.73 5,957,604.93 1481,131.25 035 11,370.90 MWD+IFR-AK-CAZ-$C(3) 13,83800 71.56 227.62 6,068.14 5,997.70 -8,162.75 -8,016.75 5,957,58134 1,481,104.75 2.25 11,406.10 NOT anA1'.glalSurvly 9518"x12414" 13,873.32 71.72 228.44 6,079.26 6,008.82 -8,18517 -8,041.67 5,957,559.43 1,481,079.39 225 11439.29 MWD+IFR-AK-CAZ-SC(4) 13,935.17 71.38 22782 6,098.84 6,02840 -8.224.33 -8,085.36 5,957,521.16 1,481,03492 1.10 11,497.37 MWD+IFR-AK-CAZ-SC(5) 14,02693 71.94 226.80 6,12771 6,057.27 -8,283.39 -6,149.38 5,957,46341 1,480,969.73 1.22 11,583.76 MM+IFR-AK-CAZ-SC(5) 14,121.92 69.01 225.10 6,159.46 6,089.02 -8,345.61 -8,213.73 5,957,402.50 1,480,904.15 3.52 11,672.79 MWD+IFR-AK-CAZ-SC (5) 14,216.96 66.32 224.82 6,195.57 6.125.13 -8,407.81 -8,275.84 5,957,341.56 1,480,84080 2.84 11760.37 MWD+IFR-AK-CAZ-SC(5) 14,310.62 66.61 225.14 6,232.97 6,162.53 -8,468.55 -8,336.54 5,957,28206 1,480,778.90 0.44 11,645.91 MWD+IFR-AK-CAZ-SC(5) 14,403.99 67.62 224.42 6,269.28 6,198.84 -8,529.61 -8,397.13 5,957,222.24 1,480,717,10 1.29 11,931.63 MWD+1FR-AK-CAZ-SC(5) 14,498.53 68.91 223.72 8,304.29 6,233.85 .8,592.71 -8,45820 5,957,160.39 1480,654.77 1.53 12,019.22 MWD+IFR-AK-CAZ-SC(5) 14.593.03 70.23 222.21 6,337.28 6,266.84 -8,657.51 -8,518.55 5,957,096.82 1,480,593.13 2.05 12,107.66 MWD+1FR-AK-CAZ-SC (5) 14,68636 71.31 221.48 6,368.01 6,297.57 -8,723.16 -8,577.34 5,957,032.38 1480.533.04 1.37 12,195.73 MWD+IFR-AK-CAZ-SC(5) 14781.88 72.16 22036 6,397.95 6,327.51 -8,791.49 -8,636.99 5,956,965.26 1,48047203 1.14 12,286.42 MWD+IFR-AK-CAZ-SC(5) 14,876.41 7230 218.95 6,426.49 6,356.05 -8,860.67 -8,69434 5,956897.26 1,480,412 91 1.91 12,376.54 MWDHFR-AK-CAZ-SC(5) 14,970.91 72.99 217.02 6.454.37 6,383.93 -8,931.83 -8,750.31 5,956,82724 1,480,35592 1.98 12,466.77 MWD+IFR-AK-CAZ-SC(5) M24/2017 2.37:22PM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: Con=Phillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Well: CDS316 North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey 10242017 2.37.22PM Page 7 COMPASS 5000.14 Buik165 Map Map Vertical MD Inc Azi TVD TVDSS +N/S +EAW Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 15,065.09 73.36 216.45 6,481.63 6,411.19 -9,004.08 -8,804.22 5,956,756.10 1,480,300.56 0,70 12,556.77 MWD+IFR-AK-CAZ-SC (5) 15,159.35 73.29 216.91 6,508.87 6,438.23 -9,076.50 -8,858.16 5,956,684.79 1480,245.18 0.47 12,646.92 MWD+IFR-AK-CAZ-SC(5) 15,253.47 73.04 216.00 6,535.93 6,465.49 -9,148.95 -8,91169 5,956,613.43 1,480,190.21 0.96 12,736.83 MWD+IFR-AK-CAZ-SC(5) 15,346.75 73.27 215.61 6,562.96 6.492.52 -9,221.36 -8.963.92 5,956542.09 1480,136.54 0.47 12.825.87 MWD+IFR-AK-CAZ-SC(5) 15,441.51 73.17 215.50 6,590.32 6,519.88 -9,295.17 -9,016.68 5,956,469.36 1,480,082.31 0.15 12,916.32 MWD+IFR-AK-CAZ-SC(5) 15535.88 73.17 21607 6,61764 6,54720 -9,368.44 -9,06949 5.956,397 17 1.480.028.03 0.58 13.006.40 MWD+IFR-AK-CAZ-SC 15) 15,631,21 73.56 217.00 6,644.93 6,574.49 -9,441.83 -9,123.87 5,956,324.90 1,479,972.20 1.02 13,097.57 MWD+IFR-AK-CAZ-SC(5) 15,725.01 7375 217.47 6671.33 6600.89 -9,51349 -9,178.33 5,956.254.35 1,479,916.30 0.52 13,18748 MWD+IFR-AK-CAZ-SC(5) 15,819.26 73.74 217.75 6,697.71 6,627.27 -9,585.17 -9,233.55 5,956,183.81 1,479,859.66 0.29 13,27].88 MWD+IFR-AK-CAZ-SC(5) 15,91267 7380 217.18 8,723.82 6,653.38 -9,656.36 -9,288.11 5.956,11374 1479,803.69 0.59 13,36748 MWD+IFR-AK-CAZ-SC(5) 16,00780 73.70 217.42 6,750.44 6,680.00 -9.729.01 -9,343.45 5,956,042.22 1,479,746.89 0.26 13,458,71 MWD+IFR-AK-CAZ-SC(5) 16,100.93 7387 218.11 6,776.45 6,706.01 -9,79930 -9,39822 5,955,97265 1479,69072 0.73 13,548.07 MWD+IFR-AK-CAZ-SC(5) 16,195.75 73.29 219.27 6,803.25 6,732.81 -9,870.69 -9,455.07 5,955,902.82 1,479,632.45 1.32 13,638.99 MWD+IFR-AK-CAZ-SC(5) 16,289.36 73.20 21943 6,83024 6,759.80 -9,94001 -9,51190 5,955,83467 1479,574.24 0.19 13728.62 MWD+IFR-AK-CAZ-SC(5) 16,38316 73.38 21947 6,857.38 6,786.94 -10,009.82 -9,569.35 5,955,76603 1.479,515.40 0.19 13,819.03 MWD+IFR-AK-CAZ-SC(5) 16,477.94 73.39 219.24 6,884.31 6,813.87 -10,079.61 -9.626.58 5,955,69]42 1,479,456.79 0.23 13,909.27 MWD+IFR-AK-CAZ-SC(5) 16,57284 73.09 219.74 6,911.68 6,841.24 -10,149.73 -9.684.37 5.955,62848 1,479,397.60 0.60 14.000.14 MWD+IFR-AK-CAZ-SC (5) 16,665.89 73.11 219.02 6,93874 6,868.30 -10,218.55 -9,740.85 5,955,560.82 1,4]9,339]5 074 14,089.16 MWD+IFR-AK-CAZ-SC (5) 16,760.99 73.39 216.54 6,966.15 6,89571 -10,28954 -9,79789 5.955.491,00 1,479,28130 0.57 14,18020 MWD+IFR-AK-CAZ-SC(5) 16,855.21 73.23 218.22 6,99321 6,922.77 -10,360.28 -9,853.92 5,955,421.39 1479,22386 0.37 14,270.42 MWD+IFR-AK-CAZ-SC(5) 16,94897 73.33 218.08 7,020.18 6,94934 -10,430.90 -9,909.39 5,955.35192 1479,16698 0.18 14,360.17 MWD+IFR-AK-CAZ-SC(5) 17,041.35 72.86 217.88 7,04705 6,976.61 -10,500.57 -9,96378 5,955,283.36 1,479,111.20 0.55 14,448.50 MWD+IFR-AK-CAZ-SC(5) 17,137.34 73.18 21767 7,07508 7,004.64 -10,573.13 -10,020.02 5,955,211.95 1479,053.52 0.39 14,540.24 MWD+IFR-AK-CAZ-SC(5) 17,233.57 72.96 217.32 7.103.10 7,032.66 -10,646.17 -10,076.06 5,955,140.05 1,478,996.03 0.42 14,632.21 MWD+IFR-AK-CAZ-SC(5) 17,327.48 73.10 216.26 7,130.51 7060.07 -10,718.11 -10,129.85 5,955,06923 1.478,940 81 1.09 14,721.89 MWD+IFR-AK-CAZ-SC(5) 17,421.19 73.83 214.60 7,157.18 7,086.74 -10,]91.30 -10,181.92 5,954,997.10 1,478,887.27 1.87 14,811.43 MWD+IFR-AK-CAZ-SC(5) 17,516.62 74.40 213.75 7,183.30 7,142.86 -10,867.24 -10,233.48 5,954922 22 1,478,834.20 1.04 14,902.74 MWD+IFR-AK-CAZ-SC(5) 17,611.14 74.84 211.54 7,208.37 7,137.93 -10,943.97 -10,282.63 5,954,84650 1,478,78352 2.30 14,993.12 MWD+IFR-AK-CAZ-SC(5) 17703.91 75.03 209.96 7,232.49 7,162.05 -11,020.96 -10.328.43 5,954,77046 1,4]8,736.18 166 15,081.53 MWD+IFR-AK-CAZ-SC(5) 17,799.38 76.47 207.23 7,255.99 7,185.55 -11,102.20 -10,372.71 5,954,690.13 1.478,69028 3.16 15,172.22 MWD+IFR-AK-CAZ-SC(5) 17,893.13 77.03 205.26 7,277.48 7,207.04 -11,184.04 -10.413.06 5.954,609.12 1.478,648.30 2.13 15,260.86 MWD+IFR-AK-CAZ-SC (5) 17,987.45 76.73 202.86 7,298.89 7,226.45 A1,267.91 -10,450.51 5.954526.03 1,478,609.17 2.50 15,349.18 MW0+IFR-AWCAZ-SC (5) 18,080.82 77.68 199.48 7,319.58 7,249.14 -11,352.80 -10,483.38 5,954,441.82 1,478,57460 3.67 15,435.34 MWD+IFR-AK-CAZ-SC (5) 18,175.32 79.44 1%.22 7,338.33 7,267.89 -11,440.95 -10,511.76 5,954,354.27 1,478,54445 3.85 15,521.11 MWD+IFR-AK-CAZ-SC(5) 18,270.13 8103 19,125 7,354.41 7,28397 -11,531.10 -10,53630 5,954,264.64 1,478,518.10 2.65 15,605.94 MWD+IFR-AK-CAZ-SC (5) 18,364.77 80.83 190.70 7,359.33 7.298.89 -11,622.33 -10,556.49 5,954,173.84 1,478,496.08 3.71 15,688.81 MWD+IFR-AK-CAZ-SC (6) 18,459.13 82.07 188.59 7,383.36 7,312.92 -11,714.32 -10,572.12 5,954,082.19 1478,47861 2.57 15,769.32 MWD+IFR-AK-CAZ-SC(5) 18,552.86 83.26 186.04 7,395.33 7,324.89 -11,806.52 -10,583.95 5,953,99026 1,478,464.92 2.98 15,847.55 MWD+IFR-AK-CAZ-SC(5) 18,647.30 84.21 184.51 7,405.64 7,335.20 -11,899.99 -10,592.58 5,953,896.98 1,478,45441 1.90 15,924.70 MWD+IFR-AK-CAZ-SC(5) 18,741.74 84.69 18177 7,414.77 ] 344.33 -11,993.84 -10,59773 5,953,80326 1478,447,38 2.93 15,999.90 MWD+IFR-AK-CAZ-SC (5) 10242017 2.37.22PM Page 7 COMPASS 5000.14 Buik165 Company: ConomPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316 Design: CD5-316 Survey ConocoPhillips Definitive Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Map Map vertical MD Inc Azi TVD TVDSS +NIS +E1 -W Northing Easting DLS Section (usft) (°) r) (usft) (usft) (usft) (usft) (ft) (ft) (°1100.) (ft) Survey Tool Name 18,836.08 86.48 179.80 7,422.03 7,351.59 -12,087.88 -10,599.02 5,953,709.27 1,478,444.20 2.82 16,072.77 MWD+IFR-AK-CAZ-SC (5) 18,930.56 87.55 178.12 7,426.95 7,356.51 -12,182.21 -10.59730 5,953,614.93 1,478,44401 2.11 16,143.93 MWD+IFR-AK-CAZ-SC (5) 19,025.04 87.30 174.91 7,431.20 7,360.76 -12,276.41 -10,591.57 5,953,520.65 1,478,447.85 3.40 16,212.40 MWD+1FR-AK-CAZ-$C(5) 19,118.90 8708 171.35 7,435.82 7,365.38 -12,36947 -10,580.35 5,953,427.39 1478.457.19 3.80 16,276.48 MWD+IFR-AK-CAZ-SC(5) 19,213.16 87.12 16885 7,440.61 7,370.17 -12,462.08 -10,563.53 5,953,334.47 1,478,472.14 3.49 16,336.61 MWD+IFR-AK-CAZ-SC(5) 19.278.96 8778 168.93 7,443.53 7.373.09 -12,52649 -10.55042 5.953.269.81 1478.483.95 1.66 16,377.53 MWD+IFR-AK-CAZ-SC(5) 19,33300 87.56 168.86 7,445.73 7,375.29 -12,579.48 -10,540.02 5,953,21663 1,478,493.28 0.42 16,411.43 NOT an Actual Survey 7 x 9.718" 19,341.54 87.53 168.85 7446.09 7,375.65 -12,587.85 -10,538.37 5,953.208.22 1,478,494.76 0.42 16,416.79 MWD+1FR-AK-CAZ-SC(6) 19,388.28 88.27 169.59 7,447.81 7,377.37 -12,63373 -00,52964 5,953,16216 1478,502.57 224 16,446.32 MWD+IFR-AK-CAZ-SC(6) 19,482.79 9065 16721 ],448.70 7378.26 -12,726.29 -1051064 5,953,069.26 1478.51970 3.56 16,505.01 MWD+IFR-AK-CAZ-SC(6) 19,577.66 91.23 168.57 7,447.14 7,376.70 -12,81984 40,49074 5,952,976.14 1,478,53773 1.58 18,563.27 MWD+IFR-AK-CAZ-SC (6) 19,672.69 91.97 171.35 7,444.49 7,374.05 -12,912.56 -10,474.18 5,952,882.30 1 478.552.40 3.03 16,624.27 MWD+IFR-AK-CAZ-SC (6) 19,767.99 91.32 174.80 7,441.75 7,371.31 -13,007.12 -10,462.69 5,952,787.55 1,478,561.98 3.68 16,689.32 MWD+IFR-AK-CAZ-SC (6) 19,863.00 91.68 175.86 7,439.26 7,368.82 -13,101]8 -10,454,96 5,952,692.76 1478,567.81 1.18 16,756.86 MWD+IFR-AK-CAZ-SC 16) 19,958.18 92.12 179.08 7,435.11 7,365.67 -13,196.80 -10.450.76 5,952,597.68 1,478,570.09 3.41 16,826.95 MWD+IFR-AK-CAZ-SC(6) 20,053.61 93,17 179.65 7,431.70 7,36126 -13,292.12 -10,449.]1 5,952,502.36 1478,569.23 1.25 16,899.30 MWD+IFR-AK-CAZ-5C(6) 20,14565 93.29 178.40 7,426.35 7,355.91 -13,387.00 -10,448.09 5,952,40747 1,478,568.93 1.32 16,970.94 MWD+IFR-AK-CAZ-SC(6) 20,244.02 91.22 177.02 7,422.59 7,352.15 -13,482.21 -10,444.28 5,952,31222 1,478,570.83 2.61 1704142 MWD+IFR-AK-CAZ-SC(6) 20,34024 90.06 175.86 7,421.52 7,351.08 -13,576.23 -10,438.31 5,952,216.10 1,478,574.86 1.70 17,111.14 MWD+IFR-AK-CAZ-SC(6) 20,434.51 89.24 171.59 7,422.10 7,351.65 -13,671.91 -10,428.01 5,952,122.24 1,478,583.28 4.61 17,176.29 MWD+IFR-AK-CAZ-SC(6) 20.52942 91.47 172.93 7,421.51 7.351.07 -13,765.95 -10,415.23 5,952,027.97 1,478,594.16 2.74 17,240.11 MWD+IFR-AK-CAZ-SC(6) 20,625.33 91.51 173.16 7,419.01 7,348.57 -13,851.12 -10,403.62 5,951,932.59 1,478,603.85 624 17,305.55 MWD+IFR-AK-CAZ-$C (6) 20,720.36 9161 171.62 7,41643 7.345.99 -13,955.27 40,391.04 5,951.838.21 1,478,614.53 1.62 17,369.59 MWD+IFR-AK-CAZ-SC(6) 20,815.63 88.03 169.43 7,416.73 7,346.29 -14,049.22 -10,375.36 5,951,743.97 1,478,628.32 4.40 17.431.48 MWD+IFR-AK-CAZ-SC (6) 20,91142 88.06 16976 7,419.99 7,349.55 -14,143.38 -10,358.07 5,951,64949 1478.643.71 0.35 17,492.50 MWD+IFR-AK-CAZ-SC(6) 21,006.60 89.17 17346 7,422.30 7,351.86 -14,237.50 -10,344.19 5,951,555.12 1,478,655.69 4.06 17.555.67 MWD+IFR-AK-CAZ-SC(6) 21,102.40 90.55 173.87 7,422.52 7,35208 -14,332.71 -10,33362 5,951,45972 1,478,66434 1.51 17,62181 MWD+IFR-AK-CAZ-SC(6) 21,197.44 8765 173.63 7,424.01 7,353.57 -14,427.16 -10,32327 5,951,365.09 1,478,672.78 3.07 17,687.52 MWD+IFR-AK-CAZ-SC(6) 21,292.22 88.32 171.23 7,427.34 7356.90 -14,52185 -10,310.80 5,951,270.97 1478,683.37 2.63 17,751.42 MWD+IFR-AK-CAZ-5C(6) 21,358.07 89.08 17150 7,429.51 7,359.07 -14,615.79 -10,296.41 5,951,175.97 1478,695.84 0.84 17,814.75 MWD+IFR-AK-CAZ-SC(6) 21,483.22 88.71 171.18 7,431.35 7,%0.91 -14,709.84 -10,282.08 5,951,081.66 1,478,708.27 0.51 17,877.59 MWD+IFR-AK-CAZ-$C(6) 21,578.21 8981 172.53 7,432.49 7,362.05 -14,80386 -10,268.63 5,950,98740 1,478,71983 1.90 1794696 MWD+IFR-AK-CAZ-SC(6) 21,673.71 89.47 173.85 7,433.01 7,362.57 -14,89868 -10,257.30 5,950,892.37 1,478,72924 1.46 18,006.32 MWD+IFR-AK-CAZ-SC(6) 21,769.53 90.08 175.74 7,433.39 7,362.95 -14,994.10 -10,248.61 5,950,79680 1,478,736.01 2.07 18,073.83 MWD+IFR-AK-CAZ-SC(6) 21,864.78 89.51 178.50 7,433.73 7,363.29 -15,089.22 -10.243.83 5,950,701.61 1478,73888 2.% 18,143.62 MWD+IFR-AK-CAZ-SC(6) 21,959.40 89.24 179.24 7,434.76 7,364.32 -15,163.82 -10,241.96 5.950,607.01 1,478,73884 0.83 18,214.88 MWD+IFR-AK-CAZ-SC(6) 22,053.07 86,77 177.04 7.438.02 7,367.58 -15,277.37 -10,238.92 5.950,513.42 1,478,740.00 3.53 18,284.60 MWD+IFR-AK-CAZ-SC(6) 22,149.39 89.75 178.04 7.440.94 7,370.50 -15,373.54 -10,234.79 5,950,417.19 1,478,742.19 3.26 18,355.61 MWD+IFR-AK-CAZ-SC (6) 22,245.79 89.94 176.93 7,441.20 7,370.76 -15,46985 -10,230.56 5,95.320.83 1478,74448 1.17 1542667 MWD+IFR-AK-CAZ-SC(6) 1012412017 2:3T22PM Page 8 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConomPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: C135-316 North Reference: Wellbore: C135-316 Survey Calculation Method: Design: CDS-316 Database: Well CDS-316 CD5-316 actual @ 70.44usft (Doyon 19) CDS-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +EI -W Northing Easting DLS Section (usft) (°) (°). (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,339.49 89.57 175.21 ],44161 7,3]1.1] -15,56332 -10.224.14 5,950.22].25 1,478,749.02 1.88 18,494.15 MWD+IFR-AK-CAZ-SC(6) 22,435.60 90.25 171.21 7,441.76 7,371.32 -15,658.74 -10,212.78 5950.13163 1,4]8,758.46 4.22 18,559.94 MWD+IFR-AK-CAZ-SC(6) 22,529.38 90.13 167.67 7,441.45 7,371.01 -15,75091 -10,19560 5.950 039,13 1,478,773.78 3.78 18,619.50 MWD+IFR-AK-CAZ-SC(6) 22,624.26 90.34 166.72 7,441.06 7,370.62 -15,84343 -10,174.57 5,949,94622 1,478,79294 1.03 18,676.86 MWD+IFR-AK-CAZ-SC (6) 22,721.44 90.42 167.64 7,440.41 7,369.97 -15,938.19 -10153.01 5,949,851.05 1.476,812 59 0.95 18,735.59 MWD+IFR-AK-CAZ-SC(6) 22,816.22 8949 170.89 7,440.49 7,370.05 -16,031.30 -10,135.35 5,949,75762 1,4]8,828.36 3.57 18,795.56 MWD+IFR-AK-CAZ-SC(6) 22,910.94 90.33 173.25 7,44063 ],3]0.19 -16,125.10 -10,122.29 5,949,663.57 1,478,839.54 2.64 18,859.03 MWD+IFR-AK-CAZ-SC(6) 23,006.09 89.65 172.49 7,440.65 7,370.21 -16,219.51 -10,110.48 5,949,56895 1,478,849.44 1.07 18.92378 MWD+IFR-AK-CAZ-SC(6) 23,101.43 89.07 173.06 7,441.72 7,371.28 -16,31409 -10,09849 5,949.474.16 1,478,859.53 0.85 18,988.50 MWD+1FR-AK-CAZ-SC(6) 23.19649 88.58 174.47 7,44367 7,373.23 -16,408.57 -10,088.17 5,949,3]9.50 1,478,86794 1 5 19,05424 MWD+IFR-AK-CAZ-SC(6) 23,29144 88.68 177.08 7,445.94 7,375.50 -16,503.22 -10,081.17 5,949,28473 14]8,8]3.03 275 19,12226 MWD+IFR-AK-CAZ-SC(6) 23.336,41 8926 176.30 7,446.74 7,376.30 -16,548.11 -10,078.58 5,949,239.80 1,478,8]4]2 2.16 19,154.97 MWD+IFR-AK-CAZ-SC(6) 23,356.49 88.61 175.46 7,447.12 7,376.68 -16,568.13 -10,077.13 5,949,219]5 14]8,875]6 5.29 19,169.38 MWD+IFR-AK-CAZ-SC(7) 23,452.90 89.08 177.59 7449.06 7,378.62 -16,664.34 -10,071.29 5,949,123.46 1,478,87966 2.26 19,239.33 MWD+IFR-AK-CAZ-SC(7) 23,547.17 84.37 174.87 7,454.45 7,384.01 -16,758.22 -10,065.11 5,949,02948 1,478,88395 5.77 19,307.27 MWD+IFR-AK-CAZ-SC(7) 23,643.19 8827 170.36 7,460.61 7,390.17 -16,853.20 -10,052.79 5,948,934.26 1,478,894.36 6.20 19,372.11 MWD+IFR-AK-CAZ-SC(7) 23,737.57 89.83 165.78 7,462.18 7,391.74 -16,945.50 -10,033.29 5,948,841.61 1,478,912.00 5.13 19430.28 MWD+IFR-AK-CAZ-SC (7) 23,83302 90.91 161.37 7461.56 7.391.12 -17.037.03 -10,006.31 5.948,74956 1,478,937.13 436 19,483.06 MWD+IFR-AK-CAZ-SC(7) 23,927.43 90.01 160.43 7,460.60 7,390.36 -17,126.24 -9,975.42 5,948,65976 1478,966.22 1.38 19,531.54 MWD+IFR-AK-CAZ-SC(7) 24,02235 88.22 157.15 7,462.27 7391.83 -1],21470 -9,941.09 5.948,570.63 1,478,998.]6 3.94 19,577.24 MWD+IFR-AK-CAZ-SC(7) 24,117.76 88.28 158.20 7,465.18 7.394.74 -17,302.92 -9.904.86 5,948,481.70 1,4]9,03320 1.10 19,621.53 MWD+IFR-AK-CAZ-SC(7) 24,213.06 88.22 161.54 7,468.09 7,397.65 -17,392.34 -9,872.09 5.948 391,65 1,479,064.16 3.50 19,66696 MWD+IFR-AK-CAZ-SC(7) 24,308.86 8972 16430 7.469.82 7,399.38 -17,483.89 -9,843.86 5,948,299.56 1,479,090.44 3.28 19,721.01 MWD+IFR-AK-CAZ-SC(7) 24,404.05 93.12 167.51 7,46746 7,39].02 -17,576.16 -9,820.79 5,948,206.85 1,479,111.75 4.91 19,776.80 MWD+IFR-AK-CAZ-SC (7) 24,498.93 93.15 171.13 7,462.27 7,391.83 -17,669.24 -9,803.23 5,948,11344 1,479.127.42 3.81 19,836.82 MWD+IFR-AK-CAZ-SC(7) 24,594.58 9300 174.70 7,457,13 7,386.69 -17,764.01 -9,79145 5,948,01846 1,479.137.29 3.73 19.901.85 MWD+IFR-AK-CAZ-SC(7) 24,690.27 91.00 176.36 7,453.79 7,383.35 -17,85934 -9,78400 5;947,92300 1,479.142.82 2.72 19,970.09 MWD+IFR-AK-CAZ-SC(7) 24.784.60 90.69 177.76 7.452,40 7,381.96 -17,953.54 -9,779.16 5,94],828.74 1,479,145.76 1.52 20,039.13 MWD+1FR-AK-CAZ-SC (7) 24,88030 89.M 176.18 7452.19 ],381.]5 -18,049.10 -9,774.11 5,947,733.10 1,479,148.90 2.03 20,109.09 MWD+IFR-AK-CAZ-SC(7) 24,975.27 89.96 179.18 ],452.59 7,382.15 -18,143.98 -9,770.26 5,947,638.17 1,479,150.83 3.19 20,179.30 MWD+IFR-AWCAZ-SC(7) 25,070.58 90.21 183.35 7,452.45 7,382.01 -18,239.25 -9,772.37 5,94],5429] 1,4]9,146.81 4.38 20,253.63 MWD+IFR-AK-CAZ-SC(7) 25,165.14 90.26 179.52 7,452.06 ],38162 -18,33376 -9.774.73 5,947,448.53 1,479,142.54 4.05 20,327.55 MWD+IFR-AK-CAZ-SC(7) 25,261.23 88.21 172.23 7,453.35 7,382.91 -18,429.52 -9,767.83 5,947,35266 1,479,14].52 7.88 20,39647 MWD+IFR-AK-CAZ-SC (7) 25,356.13 91.18 166.13 7,453.85 7,383.41 -18,522.68 -9,750.02 5,947,259.17 1,479,16344 7.15 20,456.39 MWD+IFR-AK-CAZ-SC(7) 25,451.31 90.12 161.35 7,452.77 7,382.33 -18,614.02 -9,723.38 5,947,167.32 1,479,18824 5.14 20,509.23 MWD+IFR-AK-CAZ-SC(7) 25,547.01 89.87 163.22 7,452.78 7,382.34 -18,705.17 -9,69426 5,947,0]560 1,479,215.51 1.97 20.560.35 MWD+IFR-AK-CAZ-SC(7) 25,641.96 9065 166.56 7.452.35 7,381.91 -18,796.83 -9,669.52 5,946,983.48 1,479,238.41 3.61 20,614.65 MWD+IFR-AK-CAZ-SC(7) 25,737.89 91.18 170.96 7.450.82 7,380.38 -18,890.88 -9,650.83 5,946,88907 1,479,255.20 462 20,674.69 MWD+IFR-AK-CAZ-SC(7) 25,83249 90.36 168.73 7449.55 7,379.11 -18,983.98 -9,634.15 5,946,795.66 1,479,270.00 2.51 20,735.29 MWD+IFR-AK-CAZ-SC(7) 25,928.27 9000 169.53 7,44924 7,378.80 -19,078.04 -9,616.09 5,946,]0126 1,479,286.16 0.92 20,79573 MWD+IFR-AK-CAZ-SC(7) 10/242017 2.'37:22PM Page 9 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Surface Coordinates Local Co-ordinate Reference: Well CDS-316 P1 Project: Western North Slope GRS Survey Corrections Survey at 13,873.32 is a BHI Survey. TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CDS Alpine West Pad Brandon Temple Digitally signed by Brandon Temple MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: COS -316 Digitally signed by~eng Dai Client Representative: g North Reference: True Wellbore: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS -NI-S +EI -W Northing Easting DLS Section (usft) (°) (°) (usft) (usit) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 26.023.18 91.55 170.14 7,447.96 7,377.52 -19,171.45 -9,599.34 5,946,607.54 1,479,301.03 176 20,856.52 MW1)+IFR-AK-CAZ-SC(7) 26,118.97 9168 173.07 7,445.26 7,374.82 -19,266.17 -9,585.36 5,946,51257 1,479,313.09 3.06 20,920.09 MWD+IFR-AK-CAZ-SC(7) 26,214.57 89.39 172.22 7,444.37 7,373.93 -19,360.97 -9,573.12 5,946,417.55 1,479,323.42 2.% 20,984.85 MWD+IFR-AK-CAZ-SC(7) 26,309.49 88.74 175.71 7,445.92 7,37548 -19,455.34 -9,563.15 5.946,323 01 1,479,331.49 3.74 21,050.72 MWD+IFR-AK-CAZ-SC(7) 26,40582 88.92 179.71 7,447.87 7,377.43 -19,551.05 -9,559.32 5,946.227.24 1,479,333.39 4.18 21,121.59 MWD+IFR-AK-CAZ-SC (7) 26,499.28 8929 18169 7,449.34 7,378.90 -19,644.99 -9,56047 5,946,133.35 1479,330.36 2.14 21,194.28 MWD+IFR-AK-CAZ-SC (7) 2659541 9080 18049 7,449.27 7,378.83 -19,741.10 -9.552.30 5,946,037.31 1,479,326.59 2.01 21.269.08 MWD+IFR-AK-CAZ-SC 17) 26,69017 9069 180.31 7.448.03 7,377.59 -19,83644 -9,56296 5,945,94200 1479,324.01 0.22 21,342.55 MWD+IFR-AK-CAZ-SC(7) 26,786.18 8982 183.66 7.447.60 7,377.16 -19.931.78 -9,566.27 5,945,846.76 1,479.318.79 3.63 21,417.71 MWD+IFR-AK-CAZ-SC(7) 26,881.10 8929 184.73 7.448.34 7,377.90 -20,02644 -9573.21 5,945,75226 1479,309.94 1.26 21,494.69 MWD+IFR-AK-CAZ-SC(7) 28.97597 9005 179.59 7,448.89 7.37845 -20,121.21 -9576.78 5,945,657.59 1,479.304.46 5.48 21.569.58 MWD+IFR-AK-CAZSC(7) 27,070.93 Nat 176.22 7,449.83 7,379.39 -20,216.09 -9,573.31 5.945,56267 1479,30802 378 21,640.03 MWD+IFR-AK-CAZ-SC(7) 27,166.80 88.74 179.05 7,451.88 7.38144 -20,311.84 -9,569.36 5,945,4M 66 1,479,308.05 2.95 21,710.84 MWD+IFR-AK-CAZ-SC(7) 27,262.51 8.99 177.09 745461 7,384.17 -20,407.46 -9,556.14 5,945.371.21 1,479,309.34 2.19 21782.01 MWD+IFR-AK-CAZ-SC(7) 27,357,49 88.38 174.94 7,457,62 7,387.18 -20.502.15 -9,559.54 5.945,276.41 1,479,314.03 2.30 21,850.31 MWD+IFR-AK-CAZ-SC(7) 27,452.40 86.58 171.42 7,461.80 7,391.36 -20,596.28 -9,548.28 5,945,182.08 1,479,323.39 4.16 21,915.19 MWD+IFR-AK-CAZ-SC(7) 27,547.54 88.11 16700 7,46620 7,39576 -20,689.61 -9,53049 5,945.088.41 1479,33929 4.91 21,975.25 MWD+IFR-AK-CAZ-SC(7) 27,643.36 89.40 163.50 7,468.29 7,397.85 .20,782.24 -9506.11 5,944,995.32 1479,361.81 3.89 22,030.53 MWD+IFR-AK-CAZ-SC(7) 27,73841 8899 165.86 7,46962 7,399.18 -20,873.89 -9481.00 5,944,903.19 1479,385.07 2.52 22,084.60 MWD+IFR-AK-CAZ-SC(7) 27,778.00 88.99 165.86 7,470.32 7,399.88 -20,912.28 .9471 33 5,944.864.62 1,479,39396 0.00 2$18]9 NOT an AeWel Survey 4-1/2" x 6-314" 27798.00 88.99 16586 7.470.67 7,40023 -20,931.67 -9,46644 5,944,845.14 1479,398.46 0.00 22,119.50 PROJECTED to TD rinal Definitive Survey Verified and Signed -off All targets andlor well position objectives have been achieved. Yes No I have checked to the best of my abUlty that the following data is correct: O Surface Coordinates P1 Declination & Convergence 2) GRS Survey Corrections Survey at 13,873.32 is a BHI Survey. 2) Survey Tool Codes Brandon Temple Digitally signed by Brandon Temple SLB DE Date: 2017.10.2510:57:10-OS'00' Weifen Dai Digitally signed by~eng Dai Client Representative: g Data 2017.102613:27,03-0800' Date. 10125/17 102412017 2:37:22PM Page 10 COMPASS 5000.14 Build 85 erger Drilling & Measurements Product Delivery Customer: ConocoPhillips Alaska Dispatched To: Well Name: CD5-310 PEj Date Dispatched: 21 7040 28759 Transmittal #: 30OCT17-SP02 DATA LOGGED \l /L./201 I M.K. BENDER AOGCC: Makana Bender 30 -Oct -17 Service Order #: 17AKA0026 Dispatched By: Stephanie Pacillo Product Description Hardcopy Digital Copy Logging Date Color Log Prints: 4 Contents on CD 7 -Aug -17 Scope Resistivity 2" MD x x 2" TVD x x 5" MD xx 5" TVD RECEIVED x x OCT 3 0 2 17 AOGC Digital Data N/A Contents on CD DLIS / LAS Data x Surveys 2 Contents on CD Directional Survey Nad27 x x Directional Survey Nad83 x x CD 1 Contents on CD Data: DLIS/ LAS x Graphics: PDF x Surveys: PDF/TXT x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkampnaconocophillips.com AlaskaPTSPrintCenteranslb.com Attn: Tom Oslerkamp Attn: Stephanie Pacillo Received By: 21 7040 28 7 s. 9 RECEIVED OCT 3 0 2017 Schlumberger AO G C C 30 -OCTOBER -2017 Notice of data acquisition change of scope. eN Please note the enclosed data set for well CD5-31 (AV was drilled in conjunc- tion with Baker Hughes. The Schlumberger data set acquired during this well was isolated to the surface and intermediate section. Stephanie Pacillo PebaTed mica/ Servicer Schlumberger 6411 A Street Anchorage, AK 99518 1 OFFICE (907)273-1700 LFINAL NADConversion Western North Slope CD6 Alpine West Pad C136-316 pi -1 CD5-316 pry RECEIVED OCT 3 0 2017 AOGCC ConocoPhillips Definitive Survey Report 25 October, 2017 21 7040 28759 ConocoPhillips ConoccPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual @ 70,44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316P81 Survey Calculation Method: Minimum Curvature Design: CD5-316P81 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well Well Position Position Uncertainty CD5-316 +N/ -S +E/ -W 0.00 usft Northing: 0.00 usft Easting: 0.00 usft Wellhead Elevation: 5,965,834.52 usft 349,250.43 usft 0.00 usft Latitude: Longitude: Ground Level: 70° 18'49.511 N 1510 13' 18.444 W 34.00 usft From To (usft) Wellbore CD5-316PB1 Tool Name Description Survey Date 96.80 1,076.25 CD5-316 Srvy 1 - SLB Magnetics Model Name Sample Date Declination Dip Angle Field Strength Azi MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC (°I 2,386.06 (°I (nT) MWD+IFR-AK-CAZ-SC BGGM2017 7/30/2017 7/30/201710:19W 17.06 80.79 57,454 Design CD5-316PB1 (usft) (usft) (ft) (ft) (°1100') Audit Notes: Survey Tool Name 36.44 000 0.00 3644 -34.00 Version: 1.0 Phase: ACTUAL Tie On Depth: 36.44 000 Vertical Section: 98.80 Depth From (TVD) +NIS +EI -W Direction 0.21 -0.28 5,965.83474 (usft) Wall) (usft) (1 36.44 0.00 0.00 220.00 Survey Program Date From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 96.80 1,076.25 CD5-316 Srvy 1 - SLB _GWD70 (CDS-31 GYD-GC-SS Gyrodata gyro single shots 7/25/2017 10:27 1,133.92 2,289.67 CD5-316 Srvy 2-SLB_MWD+GMAG(C Azi MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/25/201710:29 2,386.06 13,800.59 CD5-316 Srvy 3- SLB _ MWD _GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/30/201710:19W 13,873.32 19,505.68 CD5-316PB1 Srvy 1-BHI_MD+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 8/12/2017 1:44:1 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +El -W Northing Easing DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 36.44 000 0.00 3644 -34.00 0.00 000 5,965834.52 349,25043 0.00 000 UNDEFINED 98.80 065 306.44 98.80 28.36 0.21 -0.28 5,965.83474 349,250.15 1.04 0.02 GYD-GC-SS(I 115.50 0.58 299.53 115.50 45.06 0.31 -0.43 5,965,63464 349,250.00 0.61 0.04 NOT an Actual Survey 20" 150.56 0.47 279.1D 150.56 80.12 0.42 -0.73 5,965,834.95 349,249.71 0.61 0.15 GYD-GC-88(1) 245.62 0,76 217.62 24561 175.17 -0.02 -1.50 5,965,834.53 349,248.93 0.71 0.98 GYD-GC.SS(1) 335.79 1.74 206.74 335.76 265.32 -1.72 -2.48 5,965,832.85 349,247.92 1.11 2.91 GYD-GC-SS(1) 427.34 3.20 208.74 4T7.22 356.78 -5.20 -4.34 5,965,829.41 349,245.99 160 6.77 GYD-GC-SS(1) 51979 3.76 200.76 519.50 449.06 -10.29 -6.65 5,985,824.36 349,243.57 0.80 12.16 GYD-GC-SS(1) 611.07 4.09 200.45 610.57 540.13 -18.14 -8.85 5,965,818.56 349,241.26 0.36 18.05 GYD-GC-SS (1) 70445 6.44 205.35 703.55 833.11 -24.00 -12.25 5,965,810.77 349,237.70 2.56 26.26 GYD-GC-SS(II 1025201710.22:26AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CDS-316 Project: Western North Slope TVD Reference: CDS-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usn (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc AZI TVD TVDSS -NI-S +EI•W Northing Easting DLS Section (usft) C) 11 (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 798.21 871 217.65 796.49 726.05 -34.37 -18.84 5,965,800.54 349,230.90 2.96 3844 GYD-GC-$$(1) 886.96 1041 220.02 884.00 813.56 -45,83 -28.11 5,965,78926 349,221.41 1.97 53.18 GYD-GC-SS(1) 980.35 13.09 219.37 97543 904.99 -60.47 -40.24 5,965,774.87 349,208.99 2.67 72.19 GYD-GC-S$(1) 1,076.25 1464 21895 1,068.53 998.09 -78.30 -54.75 5.965.757.35 349.194.12 1.62 95.17 GYD-GC-SS(1) 1,13392 1505 21725 1,124.28 1,053.84 -89.92 63.86 5,965,745.90 349,18438 1.04 109.94 MWD+IFR-AK-CAZ-SC(2) 1,228.42 17.38 216.17 1,215.01 1,144.57 -11109 -7962 5,965,725.06 349,16860 2.49 136.28 MWD+IFR-AK-CAZ-SC(2) 1,322.21 2022. 21480 1,303.79 1,233.35 -135.71 -97.14 5.965.700.80 349,150.59 3.06 16640 MWD+IFR-AK-CAZ-$C(2) 1,416.81 22.32 213.82 1,391.94 1,321.50 -164.06 -11647 5.965.672.84 349,130.70 2.25 200.54 MWD+IFR-AK-CAZ-SC (2) 151100 2502 211.11 1,478.20 1,407.76 -19598 -136.72 5,965,641.34 349,109.81 3.09 238.01 MWD+IFR-AK-CAZ-SC(2) 1,60589 2726 210.76 1563.38 1.492.94 -231.84 -158.21 5,965,605.92 349,087.61 2.37 279.29 MWD+IFR-AK-CAZ-SC(2) 170089 29.85 210.65 1,646.38 1,575.94 -270.67 -181.27 5,965,557.56 349,063.78 234 323.87 MWD+IFR-AK-CAZ-SC(2) 1,794]2 31.79 211.13 1,727.38 1,658.94 -312.14 -206.09 5,965,52660 349,038.13 2.07 371.59 MWD+IFR-AK-CAZ-SC(2) 1,888.64 3172 211.24 1,807.24 1.736.80 -354.43 -231.68 5,965,484.84 349,011.70 0.10 420.43 MWD+IFR-AK-CAZ-SC(2) 1,983.09 34.92 211.36 1,886.16 1,81572 -398.75 -258.63 5,965,44107 348.983.86 3.39 471.71 MWD+IFR-AK-CAZ-SC(2) 2,077.54 3608 212.07 1,962.07 1,89163 -446.53 -288.17 5,965,393.90 348.953.37 3.38 527.30 MWD+IFR-AK-CAZ-SC(2) 2,172.54 39.77 214.71 2,035.98 1,965.54 496.34 -321.04 5,965,344,76 348,919.52 249 586.58 MWD+IFR-AK-CAZ-SC(2) 2,26].09 41:58 217.53 2,107.69 2,037.25 -546.09 -357.38 5.965.295.75 348,882.19 2.73 648.05 MWD+IFR-AK-CAZ-SC (2) 2.289.67 42.28 216.89 2,124.49 2,054.05 -558.11 -366.50 5,965,283.92 348,872.83 363 663.12 MWD+IFR-AK-CAZ-SC (2) 2,360.00 42.36 217.87 2,176.50 2,106.06 -595.74 -395.24 5,965,24688 348,843.33 0.94 710.42 NOT an AOtual Survey 13 3/8" x 16" 2,386.06 42.39 21823 2,195.75 2,125.31 -609.57 -406.07 5,965,233.27 348,832.23 0.94 727.97 MWD+IFR-AK-CAZ-SC(3) 2,452.06 43.15 218.86 2,244.21 2,173.77 -644.63 434.01 5,965,19878 348,803.60 1.32 772.79 MWD+IFR-AK-CAZ-SC(3) 2,547,72 46.71 218.49 2,311.91 2,241.47 597.35 476.20 5,965,146.92 348,760.36 373 840.30 MWD+IFR-AK-CAZ-SC(3) 2,601.16 48.40 219.76 2,374.7 2,304.53 -750.84 -51972 5,965,094.32 348,715.78 2.07 909.24 MWD+IFR-AK-CAZ-SC(3) 2,735.35 51.15 220.19 2,43579 2,365.35 -805.94 -565.92 5,965,040.16 348,66849 2.94 981.15 MWD+IFR-AK-CAZ-$C(3) 2,829.83 53.66 221.57 2,49342 2,422.98 -852.53 -614.93 5,964,984.57 348,618.36 2.92 1,056.00 MWD+IFR-AK-CAZ-SC(3) 2,924.19 55.90 224.14 2,547.82 2,477.38 -919.02 567.37 5,964,929.15 348,564]9 3.24 1,132.99 MWD+IFR-AK-CAZ-SC (3) 3,018.35 58.10 225.51 2,599.11 2,528.67 -975.02 42304 5,964,874.29 348,508.01 2.64 1,21167 MWD+IFR-AK-CAZ-SC(3) 3,110.07 60.11 226.51 2,646.20 2,57576 -1,029.67 -77967 5,964,82078 348,450.31 2.38 1,289.93 MWD+IFR-AKCAZ-SC(3) 3,202.95 62.28 226.86 2,690.95 2,620.51 -1,085.50 -838.88 5,964,766.16 348,389.99 2.36 1,37036 MWD+IFR-AK-CAZ-SC (3) 3,298.68 6425 227.52 2,734.01 2,663.57 -1,143.59 -901.60 5,964,709.34 348,326.12 2.15 1,455.58 MWD+IFR-AK-CAZ-SC)3) 3,390.58 6682 229.53 2,772.07 2.701.63 -1,198.97 -964.28 5.964,655.24 348,262.35 3.43 1,538.29 MWD+IFR-AK-CAZ-SC(3) 3,485.15 69.% 229.99 2,87.59 2,737.15 4,255.59 -1,031.18 5,964,599.98 348,194.33 241 1,624.66 MWD+IFR-AK-CAZ-SC(3) 3,579.71 69.67 229.04 2,840.91 2,770.47 -1,31304 -1.098.48 5,964.503.89 348,125.89 1.14 1,711.94 MWD+IFR-AK-CAZ-SC(3) 3,673.45 70.78 228.63 2,872.63 2,802.19 -1,371.10 -1,164.89 5,964487 18 348,058.34 1.25 1,799.10 MWD+IFR-AK-CAZ-SC(3) 3.76464 72.03 228,00 2,901.71 2,831.27 -1,428.58 -1,229.43 5,964,43101 347,99266 1.52 1,884.62 MWD+IFR-AK-CAZ-SC(3) 3,858.96 71.97 226.95 2,930.85 2,86041 -1,489.21 -1,295.54 5,964371.73 347,925.35 1.06 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3,953.82 72.25 225.76 2,959.99 2,889.55 -1,55152 -1,36086 5,964,31075 347,858.79 1.23 2,063.28 MWD+IFR-AK-CAZ-SC(3) 4,047.32 7260 224.30 2,988.23 2,917.79 -1,614.51 -1,423.92 5.964,249.04 347,794.49 1.53 2,152.07 MWD+IFR-AK-CAZ-SC(3) 4,141.31 72.55 223.34 3,016.38 2,945.94 -1,679.21 -1,486.01 5,964,18560 347,731.12 0.98 2,241.54 MWD+IFR-AK-CAZ-SC (3) 4,236.41 7266 22308 3044.79 2,97435 -1,74536 -1,548.15 5,964,12072 347,667,67 0.29 2,332.16 MWD+IFR-AK-CAZ-SC(3) 10/252017 10.22:26AM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NIS +E/ -W Northing Easting DLS Section (usft) 0 (1) (usft) (usft) (usft) (usft) (ft) (ft) ('1100') (ft) Survey Tool Name 4,330.72 72.54 22328 3,07298 3,002.54 -1,810.99 -1,609.74 5,964,056.35 347,60478 0.25 2,422.02 MWD+1FR-AK-CAZ-SC(3) 4,42363 72.56 223.72 3,100.84 3,030.40 -1,875.28 -1,67075 5.963,993.30 347,542.49 045 2,510,49 MWD+IFR-AK-CAZ-SC(3) 4,517.57 72.58 224.24 3,12898 3,058.54 -1,93978 -1,732.99 5,963,930.07 347,478.98 0.53 2,599.90 MWD+IFR-AK-CAZ-SC(3) 4,612.69 72.58 223.64 3,157.45 3,087.01 -2,005.13 -1,795.96 5,963.8N 00 347,414.71 0.60 2,690.44 MWD+IFR-AK-CAZ-SC(3) 4,705.14 72.60 224.42 3.185,12 3,11468 -2,068.55 -1,857.27 5,963,803.83 347,352.14 0.81 2,778.43 MWD+IFR-AK-CAZ-SC(3) 4,798.99 72.07 224.13 3,213.59 3,143.15 -2,13258 -1919.70 5,963,741.07 347,288.44 0.64 2,867.61 MWDHFR-AK-CAZ-SC(3) 4,894.64 7159 22449 3,243.42 3,172.98 -2,197.61 -1,983.18 5,963,677.33 347,223.67 0.62 2,95823 MWD+IFR-AK-CAZ-SC(3) 4,989.18 71.53 22526 3,273.33 3,202.89 -2,261.16 -2,046.46 5,963,615.06 347,159.14 078 3,047 59 MWD+IFR-AK-CAZ-SC(3) 5,083.50 71.53 22544 3,303.21 3,23277 -2,32409 -2,110.11 5,963,553.49 347,09425 0.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 5,178.53 71.56 225.79 3,333.29 3,262.85 -2,387.09 -2,174.53 5.963,491,75 347,028.58 0.35 3,226.38 MWD+IFR-AK-CAZ-SC(3) 5,272.95 71.57 226.43 3,363.15 3,292.71 -2,449.19 -2,239.08 5,963,430.96 346,962.80 0.64 3,315.44 MWD+IFR-AK-CAZ-SC(3) 5,36645 71.53 225.95 3,392.74 3,322.30 -2,51059 -2,303.09 5.963.370.66 346,897.58 0.49 3,403.62 MWDHFR-AK-CAZ-SC(3) 5,461.40 71.56 22548 3,42280 3,35236 -2,57347 -2,367.56 5,963,309.29 346,83186 0.47 3,493.24 MWD+IFR-AK-CAZ-SC(3) 5,555.27 71.56 225.52 3,452.49 3,382.05 -2,635.89 -2,431.08 5,963,248.16 346,767.10 0.04 3,581 88 MWD+IFR-AK-CAZ-SC (3) 5,649.96 71.56 225.23 3,482.44 3,41200 -2,698.99 -2,495.01 5,963,186.36 346,701.92 0.29 3,671.31 MWD+IFR-AK-CAZ-SC(3) 5,744.30 71.57 225.19 3.512.27 3,441.83 -2,762.04 -2,558.53 5,963,124.60 346.537.16 0.04 3,76044 MWD+IFR-AK-CAZ-SC(3) 5,838.77 71.53 225.67 3,542.17 3,47173 -2,824.93 -2,622.37 5,963,063.01 346,572.07 048 3,849.65 MWD+IFR-AK-CAZ-SC(3) 5,933.26 71.50 225.31 3,572.13 3,501.69 -2,887.76 -2,686.27 5.96300149 346,506.92 0.35 3.938.85 MWD+IFR-AK-CAZ-SC(3) 6,027.10 71.57 225.81 3,601.85 3.531.41 -2,950.08 -2,749.83 5,962,94046 346,442.14 0.51 4,027.44 MWD+IFR-AK-CAZ-SC(3) 6,120.92 71.56 224.80 3,631.52 3,561.08 -3,012.68 -2,813.09 5,962,879.15 346,377.63 1.02 4,116.07 MWD+IFR-AK-CAZ-SC(3) 6,214.35 71.53 224.80 3,661.10 3,590.66 -3,075.56 -2,875.54 5,962,817.53 346,313.94 0.03 4,204.38 MWD+IFR-AK-CAZ-SC(3) 6,30887 71.56 224.24 3,690.96 3,620.52 -3,139.35 -2,93828 5,962,755.02 346,249.94 0.56 4,293.57 MWD+IFR-AK-CAZ-SC(3) 6,402.34 71.63 224.69 3,720.53 3.650.09 -3,20278 -3,000.53 5,962,692.86 346,186.43 0.46 4,382.18 MWD+IFR-AK-CAZ-SC(3) 6,49720 71.40 22447 3,750.61 3,680.17 -3,266.86 -3,063.68 5,962,630.06 346,12201 0.33 4,471.86 MWD+1FR-AK-CAZ-SC(3) 6,59137 7157 224.87 3,780.51 3,710.07 -3,330.37 -3,126.46 5,962,567.84 346,057,98 0.44 4,560.66 MWD+IFR-AK-CAZ-SC(3) 6,684.55 71.51 225.26 3,810.02 3,739.58 -3,392.80 -3,189.02 5,962,50668 345,994.17 0.40 4,648.90 MWD+IFR-AK-CAZ-SC(3) 6,778.69 71.44 224.85 3,839.93 3,769.49 -3,455.85 -3,252.20 5,962,44491 345,92974 0.42 4,737.81 MWDHFR-AK-CAZ-SC.(3) 6.873.27 71.44 224.69 3,870.03 3,799.59 -3,519.51 -3,315.35 5,962,382.54 345,865.34 0.16 4827.16 MWD+IFR-AK-CAZ-SC(3) 6,966.71 71.51 225.08 3,89972 3,829.28 -3,582.28 -3,377.87 5,962,321.04 345,801.57 0.40 4,915.44 MWD+IFR-AK-CAZ-SC(3) 7,061.41 71.50 225.09 3,929.76 3,859.32 -3,645.69 4441.47 5,962,258.92 345,736.72 0.01 5,004.89 MWD+IFR-AK-CAZ-SC(3) 7,155.57 71.47 225.07 3,959.66 3,889.22 -3,708.74 -3,50469 5,962.197.16 345,672.25 0.04 5,093.83 MWD+IFR-AK-CAZ-SC(3) 7,251.39 71.42 225.05 3,990.15 3,919.71 -3,772.90 -3,568,99 5,962,134.31 345,606.68 0.06 5,184.32 MWD+IFR-AK-CAZ-SC(3) 7,346.55 72.03 225.48 4,019.99 3.949.55 -3,836.50 -3,633.18 5.952,072.02 345,541.23 0.77 5,274.29 MWD+IFR-AK-CAZ-SC (3) 7,438.01 71.98 22444 4,04825 3.977.81 -3,898.05 -3,694.65 5,962,011.72 345,478.55 108 5,36085 MWD+IFR-AK-CAZ-SC(3) 7,532.62 71.96 224.60 4,077.53 4,007.09 -3,962.20 -3,757.73 5,961,948.86 345,414.20 0.16 5,450.64 MWD+IFR-AK-CAZ-SC(3) 7,626.80 71.99 224.89 4,106.67 4,036.23 -4,025.80 -3,820.77 5,961,886.53 345,349.89 0.29 5,539.89 MWD+IFR-AK-CAZ-SC(3) 7,72069 71.99 224.97 4.135.70 4,065.26 -4,08902 -3,88383 5,961,824.60 345,285.58 0.08 5,628.85 MWD+IFR-AK-CAZ-SC(3) 7,81461 72.01 225.63 4.164.73 4,094.29 -4,151.85 -3,947.32 5,961,763.06 345,220.85 0.67 5,717.79 MWD+IFR-AK-CAZ-SC(3) 7,907.83 7202 226.60 4,193.51 4,123.07 4213.31 -4,011.22 5,961,702.90 345,15573 0.99 5,805.95 MWD+IFR-AK-CAZ-SC(3) 8,001.23 71.98 225.92 4,222.37 4,151.93 4,274.72 -4,07540 5,961,642.79 345,090.34 0.69 5,894.25 MWD+IFR-AK-CAZ-SC(3) 10252017 10.22:26AM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70 44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CDS-316 actual Q 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB7 Survey Calculation Method: Minimum Curvature Design: CD5-316PB7 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) V) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 8,095.52 71.84 225.57 4,251.65 4,181.21 -4,337.27 4,139.60 5,961,581.55 345,02490 0.38 5,983.42 MWD+IFR-AK-CAZ-SC(3) 8,190.64 71.52 225.34 4,281.55 4,211.11 .4,400.61 -4,203.95 5,961,519.52 344,959.29 041 6,073.31 MWD+IFR-AK-CAZ-SC(3) 8,283.93 71.50 225.47 4,311.13 4,240.69 4,462.73 -4,266.95 5,961458.68 344,995.06 0.13 6,161.40 MWD+IFR-AK-CAZ-SC(3) 8.378.39 71.47 226.52 4,341.13 4,270.69 -4,524.96 4,331.38 5,961,39717 344,829.40 1,05 6,250.47 MWD+IFR-AK-CAZ-SC (3) 8,47266 71.44 227,46 4,371.11 4,300.67 4,585.92 4,396.73 5,961,338.13 344)62.84 0.95 6,339.18 MWD+IFR-AK-CAZ-SC(3) 8,566.86 71.41 227.16 4,401.12 4,33068 -4,546.46 -4,462.37 5,961,278.92 344,696.01 0.30 6,427.75 MWD+IFR-AK-CAZ-SC(3) 8.661.19 71.63 227.01 4431.02 4,360.58 -4,707.38 -4,527.89 5,961,219.34 34,629.29 0.28 6,516.53 MWD+IFR-AK-CAZ-SC(3) 8,75541 71.57 225.59 4,460.76 4,390.32 -0,769.15 -4,592.52 5,961,15889 344.563.43 143 6,605.39 MWD+1FR-AK-CAZ-SC(3) 8,849.96 7147 225.07 4,490.73 4,420.29 -0832.19 4,656.29 5,961.097.14 344,49841 0.53 6,694.68 MWD+IFR-AK-CAZ-SC(3) 8.9,1368 71.41 22471 4.520.55 4,450.12 -4,895.13 -4,719.00 5,961035.47 344,434.46 0.37 6,783.20 MWD+1FR-AK-CAZ-SC(3) 9,037.62 71.48 224.88 4,55046 4,480. D2 -4,958.33 -4,78114 5,960,973.55 344,370.46 0.19 6,871.95 MWD+IFR-AK-CAZ-SC(3) 9131.63 71.47 225.66 4,580.33 4,509.89 -5,021.06 4,845.07 5,960,912.11 344.305.89 0,79 6,960.71 MWD+1FR-AK-CAZ-SC(3) 9,226.41 7154 22620 4,610.39 4,539.95 -5,083.58 -4,909.65 5,960,850.90 344,240.06 0.55 7,050.11 MWD+IFR-AK-CAZ-SC(3) 9,320.96 71.47 226.69 4.640.39 4,56995 -5,145.37 -4,974.63 5,960,790.44 344,173.87 0.50 7,139.21 MWD+IFR-AK-CAZ-SC(3) 9,416.14 71.54 227.20 4,670.58 4,600.14 -5,206.99 -5,040.59 5,960.730.16 344,106.70 0.51 7,228.81 MWD+IFR-AK-CAZ-SC(3) 9,50975 71.54 22636 4,700.22 4,629.78 -5,267.79 -5,105.29 5,960,67067 344,040.79 0.85 7,316.98 MW0+1FR-AK-CAZ-SC(3) 9.604.30 71.47 226.05 4,73021 4,659.77 -5,329.85 -5,170.02 5,980,60993 343,974.84 0.32 7,406 13 MMNFR-AK-CAZ-SC(3) 9,698.73 71.53 22547 4,760.18 4,68974 -5,392.33 -5,234.17 5,960,548]6 343.909.45 0.59 7,495.22 MWD+IFR-AK-CAZ-SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 -5,455.41 -5,297.76 5,960,486.97 343,844.61 0.48 7,584.42 MWD+IFR-AK-CAZ-SC(3) 9,88823 71.51 224.84 4,820.26 4,749.82 -5,519.25 -5,36142 5,960,424.43 343,779.69 0.15 7.674.24 MWD+IFR-AK-CAZ-SC(3) 9,98140 71.47 22410 4,849.84 4,779.40 -5,581.97 -5,423.64 5,960,36297 343,716.23 0.15 7.76229 MWD+1FR-AK-CAZ-SC(3) 10,075.46 71.54 225.61 4,879.68 4,809.24 -5,644,88 -5,486.88 5,960,301.35 343,651.74 0.92 7,851.13 MWD+IFR-AK-CAZ-SC (3) 10,169.70 71.48 225.41 4,909.0 4,839.12 -5.707.51 -5,55064 5,960,240.02 343,586.74 0.21 7,940.09 MWD+1FR-AK-CAZ-SC(3) 10,261.84 71.54 225.24 4,938.79 4,868.35 -5,768.95 -5,612.78 5,960,179.84 343,523.38 0.19 8,027.09 MWD+IFR-AK-CAZ-SC(3) 10,354.14 71.54 223.92 4,968.01 4,897.57 -5,831.31 -5,674.23 5,860,118.74 343,460.70 1.36 8,114.36 MWD+IFR-AK-CAZ-SC(3) 10.448.48 71.51 223.01 4,9991 4,927.47 -5,80.25 -5,735.78 5,960,055.05 343,397.86 0.92 8,203.68 MWD+IFR-AK-CAZ-SC(3) 10,542.93 71.44 223.34 5,027.92 4,957.48 -5,96155 -5.797.06 5,959.990.99 343,335.29 0.34 8,293.10 MWD+IFR-AK-CAZ-SC (3) 10,63766 71.44 222.95 5,058.07 4,98783 -6,027.08 -5,85847 5,959,926.71 343,272.58 0.39 8,382.76 MWD+1FR-AK-CAZ-SC(3) 10.732.15 7154 223.40 5.088.07 5,017.63 -6,09242 -5,91938 5,959,86262 343,209.97 0.46 8,472.23 MWD+IFR-AK-CAZ-SC(3) 10,826.0 7147 223.51 5.118.05 5,047.61 6,157.49 -5,981.42 5,959,798.81 343,14204 0.13 8,56169 MWD+IFR-AK-CAZ-SC(3) 10.920.49 71.51 224.37 5,147.84 5,077.40 6,22155 -6,043.16 5,959,736.00 343,08403 087 8,650.46 MWD+IFR-AK-CAZ-SC(3) 11,015.80 71.57 225.09 5,178.02 5,107.58 -6,285.78 -6,106.79 5,959,673.07 343,019.13 0.72 8,74055 MWD+IFR-AK-CAZ-SC(3) 11,110.71 71.54 225.23 5,208.05 5,137.61 -6,349.27 -6,17063 5,959,61088 342,954.04 0.14 8,830.22 MWD+IFR-AK-CAZ-SC(3) 11,204.34 71.51 225.98 5,23732 5,167.28 -6,411.39 6.234.08 5,959,55005 342,889.35 0.76 8,91860 MWD+IFR-AK-CAZ-SC(3) 11,298.22 71.51 225.54 5.26]49 5,197.05 6,473.51 6,297 87 5,959,489.23 342,824.34 0.44 9,007.19 MWD+IFR-AK-CAZ-SC(3) 11,392.43 7147 226.35 5,297.40 5,226.96 6,535.63 -6,362.07 5,959,428.42 342,758.91 0.82 9,096.04 MWD+1FR-AK-CAZ-SC (3) 11,486.64 71.57 226.81 5.327.26 5,25582 -6.597.04 6,428.97 5,959,368.32 342,692.79 0.48 9,184.81 MWD+IFR-AKCAZ-SC(3) 11,581.31 71.51 225.71 5,357.24 5,286 80 .6,659.13 6,491.85 5,959,39.0 342,626.69 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11,675.58 71.54 226.01 5,387.11 5,316.67 6,721.40 6,556.01 5,959,246.59 342,561.29 0.30 9,363,01 MWD+1FR-AK-CAZ-SC(3) 11,769.70 71.45 226.05 5,416.98 5,346.54 6,783.36 -6,620.25 5,959,185.93 342,495.83 0.10 9,451.77 MWD+IFR-AK-CAZ-SC (3) 117252017 10..22:26AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CDS-316PB1 Database: OAKEDMP2 Survey Map Map vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,864.23 7154 226.31 5,446.99 5,376.55 6,845.43 -6,684.93 5,959,125.18 342,429.92 028 9,540.89 MWD+IFR-AK-CAZ-SC(3) 11,957.80 71.51 225.67 5,476.64 5,406.20 6,907.09 6,746.76 5,959,064.82 342,364.87 0.65 9,629.15 MWD+IFR-AK-CAZ-SC(3) 12,052.51 71.56 226.14 5,506.64 5,436.20 6,969.6D 6,813.27 5,959,00362 342,299.12 0.47 9,718.51 MWD+IFR-AK-CAZ-SC (3) 12,146.60 71.56 22589 5,536.41 5,465.97 -7,03159 6,87749 5,958,94294 342,233.67 0.25 9,807.27 MWD+1FR-AK-CAZ-SC(3) 12,24151 71.53 225.34 5,566.47 5,496.03 -7,094.55 -6,941.83 5,958,881.28 342,16809 0.55 9,896.87 MWD+IFR-AK-CAZ-SC(3) 12,335.11 7157 225.41 5,596.10 5,525.66 -7,156.93 -7.005.02 5,958,820.20 342,103.66 0.08 9,985.26 MWD+IFR-AK-CAZSC(3) 12,429.97 71.56 225.27 5,626.09 5,555.65 -7,220.18 -7,069.03 5,958,758.25 342,038.40 0.14 10,074.87 MWD+IFR-AK-CAZ-SC(3) 12,52383 71.47 224.14 5,655.85 5,58541 -7,28345 -7.131.65 5,958.696.25 341,974.52 1.15 10,163.58 MWD+IFR-AK-CAZ-SC(3) 12.61897 71.51 224.02 5,686.06 5,615.62 -7,348.26 -7,19441 5,958,632.72 341.91048 0.13 10,25357 MWD+IFR-AK-CAZ-SC(3) 12,711.50 71.54 224.33 5,715.38 5,644.94 -7,41120 -7,25557 5,958,571.02 341,848.08 0.32 10,341.10 MWD+IFR-AK-CAZ-SC(3) 12,806.89 71,65 224.34 5,745.50 5,675.06 -7,475.94 -7,318.82 5,958,507.57 341,783.54 0.12 10,431.35 MWD+IFR-AK-CAZ-SC (3) 12,901.29 72.05 224.84 5,774.90 5,70446 -7,539.82 -7,381.80 5.958,444.97 341,719.30 0.66 10,520.77 MWD+IFR-AK-CAZ-SC(3) 12,99580 71.98 224.41 5.804.09 5,733.65 -7,603.80 -7,444.94 5,958,382.28 341,654.89 0.44 10,610.36 MM+IFR-AK-CAZ-SC 13) 13,090.91 71.99 224.79 5,833.50 5,783.06 -7,668.20 -7,50845 5.958,319.17 341,590.11 0.38 10,700.52 MWD+IFR-AK-CAZ-SC(3) 13,18641 71.93 22460 5.862.45 5,792.01 -7,731.40 -7,570.98 5,958,257.25 341,526.33 020 10,789.13 MW +11FR-AK-CAZ-SC(3) 13,279.48 71.90 224.71 5,891.97 5,821.53 -7,795.68 -7,634.50 5,958,194 25 34146153 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,373.83 7204 225.41 5,921.17 5,850.73 -7.859.06 -7.698.00 5,958,132.17 341,395.77 072 10,958.57 MWD+IFR-AK-CAZ-SC(3) 13,468.20 71.50 22544 5,950.69 5,880.25 -7,921.97 -7,76185 5,958,070.56 341,331.68 0.57 11,057.80 MWD+IFR-AK-CAZ-SC(3) 13,562.30 71.51 22889 5,980.54 5,910.10 4,983,77 -7,826.22 5,958,010.07 341,266.09 1.46 11,146.52 MWD+IFR-AK-CAZ-SC(3) 13,656.37 71.47 226.33 6,01041 5,939.97 -8,045.05 -7,891.04 5,957,950.11 341200.05 0.57 11,235.13 MWD+IFR-AK-CAZ-SC(3) 13,750.15 71.45 227.14 6,04023 5,969.79 -8,105,99 -7,955.79 5.957,890.49 341.134.10 0.82 11,323.43 MWD+IFR-AK-CAZ-SC(3) 13,800.59 7144 226.74 6,056.26 5,985.84 -8,13863 -7,990.73 5,957,858.55 341,098.52 035 11,37090 MWD+IFR-AK-CAZ-SC (3) 13.83800 71.58 227.62 6,068.14 5,997.70 -8,16215 -8,016.75 5,95783496 341072.02 225 11406.10 NOT an Actual Survey 9 $18" x 12-V41" 13,873.32 71 72 22544 6.079.26 6,008.82 -8,185.1] -8,041.67 5,957,813.05 341,046.65 225 11,43929 MWD+IFR-AK-GAZ-SC (4) 13.898.1] 71.59 228.79 6,087.08 6,016.64 -8,200]6 -13,059.37 5,957,79].81 341,02865 1.44 11,462.61 MWD+IFR-AK-CAZ-SC(4) 13.991.32 71.56 226.41 6,116.53 6,046.09 -8,260.35 -8,124.63 5,957,739.56 340,962.21 2.42 11,550.20 MWD+IFR-AK-CAZ-SC (4) 14.085.38 72.04 222.75 6,14592 6,075.48 -8,323.98 -8,187.33 5,957,677.20 340,898.25 3.73 11.639.25 MWD+IFR-AK-CAZ-SC(4) 14,17]0] 7260 21838 6,17377 6,10333 -8,39033 -8,244.12 5,957,612.01 340,840.14 4.58 11.726.58 MWD+IFR-AK-CAZ-SC(4) 14,271.68 73.52 214.04 6,201.35 6,130.91 -8,463.34 -8,297.56 5,957,540.09 340,78525 449 11,816.86 MWD+IFR-AK-CAZ-SC(4) 14,365]6 7404 209.05 6,227.65 6,157.21 -8,540.30 -8,344.80 5,957,464.10 340,73648 5.12 11,906.18 MWD+IFR-AK-CAZ-SC(4) 14,460.74 75.09 204.81 6,252.94 6,182.50 -8,621.91 -8,386.25 5,957,383.35 340,693.41 4.44 11,995.34 MWD+IFR-AK-CAZ-SC(4) 14,556.16 75.82 20160 6,276.90 6,206.46 -8,706.79 -8,42263 5,957299.22 340.655.33 3.34 12,08375 MWD+IFR-AK-CAZ-SC(4) 14,650.34 75.82 200.54 6,299.98 6,229.54 -8,791.99 -8,455.46 5,957,214.70 340,620.80 1.09 12,170.12 MWD+IFR-AK-CAZ-SC(4) 14,745.48 7594 201.69 6,323.19 6,252.75 -8,878.06 -8,488.69 5,957,129.32 340,585.84 1.18 12,257.42 MWD+IFR-AK-CAZ-SC 14) 14,840.21 76.04 202.02 6,346.12 6,275.68 -8,963.37 -8,522.91 5.957 N4.73 340,549.93 0.35 12,344.76 MWD+IFR-AK-CAZ-SC(4) 14,933.86 76.00 203.20 6,368.75 6,298.31 -9047.26 -8,557.84 5,956 961 56 340,513.31 1.22 12,431.48 MWD+IFR-AK-CAZ-SC(4) 15,02823 7600 202.54 6,391.58 6,321.14 -9,131.63 -8,593.43 5,956,87793 340,476.04 0.68 12,518.98 MWD+IFR-AK-CAZ-SC(4) 15,122.85 76.02 203.81 6,414.45 6,344.01 -9,216.03 -8,629.56 5,956,794.28 340,438.23 1.30 12,606.86 MWD+IFR-AK-CAZ-SC(4) 15,216.07 76.00 203.65 6,436.99 6,366.55 -9,298.84 -8.665.96 5,956.712.22 340,400.17 0.17 12,693.70 MWD+IFR-AK-CAZ-SC(4) 15,31150 7597 203.99 6460.11 6,38967 -9.38357 -8,703.37 5956628.26 340,361.07 0.35 12,782.65 MWD+IFR-AK-CAZ-SC(4) 10252017 102226AM Page 6 COMPASS 500014 Build 85 ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well C05-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 15,40590 75.97 204.07 8482.98 6,412.54 -9,467.18 -8,740.65 5,95,545.42 340,322.13 0.08 12,870.67 MWD+IFR-AK-CAZ-SC (4) 15,49946 7578 204.71 6,505.82 6,435.38 -9,549.82 -8,778.12 5.956,463.56 340,283.01 0.69 12,958.05 MWD+IFR-AK-CAZ-SC(4) 15,59324 75.78 204.38 6,528.85 6.458.41 -9,632.51 -8,815.88 5,95,381.65 340,243.60 0.34 13,045.67 MWD+1FR-AK-CAZ-SC(4) 15,687.69 75.78 203.76 6,552.05 6,481.61 -9,716.10 -8,853.22 5,956,298.83 340,204.59 0.64 13.133.71 MWD+1FR-AK-CAZ-$C (4) 15.78197 75.81 203.31 6,575.19 6,504.75 -9,799.90 -8,88972 5,9W,215 79 340,16642 0.46 13,221.36 MWD+1FR-AK-CAZ-SC(4) 15,876.86 75.81 202.90 6,598.45 6,52801 -9,884.51 -8,925.82 5,956,131.92 340,128.63 0.42 13,309.38 MWD+IFR-AK-CAZ.SC(4) 15,972.96 75.78 202.74 6.62203 6,551.59 -9,970.38 -8,961.95 5,955,046.80 340,090.79 0.16 13,398.39 MWD+IFR-AK-CAZ-SC(4) 16,065.85 75.81 202.15 ,644.83 6,574.39 -10,053.61 -8,996.33 5,955,964.29 340,054.75 0.62 13.48424 MWD+1FR-AK-CAZ-$C(4) 16,160.10 75.79 201.84 6,667.95 6,597.51 -1 D, 138.33 -9,03055 5,955,880.28 340,018.83 0.32 13,571.14 MWD+IFR-AK-CAZ-SC(4) 16,253.94 7578 201.55 6,690.99 6,62055 -10,222.65 -9,064.18 5,955,796.45 339,983.52 0.30 13,657.50 MWD+IFR-AK-CAZ-SC(4) 16,398.37 75.85 201.68 6,714.13 6,643.69 -10,307.97 -9,097.90 5,955,712.04 339,948.10 0.15 13,744.38 MWD+IFR-AK-CAZ-SC(4) 16,443.15 7575 201.67 6.737.38 6,666.94 -10,393.35 -9,131.84 5,955,627.36 339,912.45 0.11 13,83160 MWD+IFR-AK-CAZ-SC (4) 16,53491 75.94 201.97 6,759.82 6,689.38 -10,475.95 -9,164.91 5,955,545.45 339,877.73 0.38 13,916.14 MWD+IFR-AK-CAZ-5C(4) 16,627.09 76.04 202.73 6,782.14 6,711.70 -10,558.67 -9,198.92 5,955,46343 339,842.07 0.81 14,001.36 MWD+1FR-AK-CAZ-SC(4) 16,720.91 7601 202.99 ,604.80 6,734.36 -10,642.% -9,23429 5,955,380.28 339,805.03 027 14,088.36 MWD+IFR-AK-CAZ-8C(4) 16,815.80 75.97 20348 6,827.77 6,757.33 -10,727.16 -9.27061 5,955,29643 339,767.02 0.50 14,176.52 MWD+IFR-AK-CAZ-SC(4) 16,911.83 75.91 203.84 6,851.10 6,78066 -10,812.49 .9,307.99 5,955,211.88 339,727.94 0.37 14,265.91 MWD+IFR-AK-CAZ-$C(4) 17,004.42 75.95 204.42 6,873.61 6,803.17 -10,894.45 -9,344.71 5,955,130.67 339,689.58 061 14,352.30 MWD+IFR-AK-CAZ-SC(4) 17,09839 7595 204.47 6,896.42 6,825,98 -10,977.44 -9,382.43 5,955,098.47 339,650.21 0.05 14,440.12 MWD+IFR-AK-CAZ-SC(4) 17.193.34 75.94 204.22 6,91948 6,849.04 -11,061.36 -9,420.40 5,954,965.34 339,610.56 0.26 14,528.81 MWD+IFR-AK-CAZ-SC(4) 17,286.86 7577 203.93 6,942.33 6,871.89 -11,144.15 -9,457.39 5,9u,883 31 339,571.92 035 14,616.01 MWD+1FR-AK-CAZ-SC(4) 17,382.09 75.88 20304 6,96565 6,895.21 -11,228.83 -9,494,19 5,954,799.39 339,53343 0.91 14,704.53 MWD+IFR-AK-CAZ-SC(4) 17,476.04 7576 20261 6.98867 6,918.23 -11,312.79 -9.529.52 5,954,716.16 339,496.42 0.46 14,791.56 MWD+IFR-AK-CAZ-SC(4) 17.56867 75.79 20164 7,011.68 6,941.24 -11,396.86 -9,563.70 5,954,632.80 339,46056 1.00 14,877.93 MWD+IFR-AK-CAZ-SC(4) 17,664.13 75.83 201.20 7,034.83 6964.39 -11,482.11 -9,597.15 5,954,548.24 339,425.42 0.45 14,96474 MWD+IFR-AK-CAZ-SC (4) 17,75847 75.78 201.38 7,057.97 6,987.53 -11,567.33 -9,630.36 5,954,463.71 339,390.51 0.19 15,051.36 MWD+IFR-AK-CAZ-SC l4) 17,852.89 75.77 201.59 7,081.17 7,010.73 -11,652.50 -9,663.88 5,954,37925 339,355.28 0.22 15,138.15 MWD+IFR-AK-CAZ-SC(4) 17,94214 7575 202.03 7,104.35 7,03391 -11,737,31 -9,697.82 5,954,295.14 339,319.65 0.45 15,224.94 MWD+IFR-AK-CAZ-SC(4) 18,041.76 75.72 201.77 7,127.67 7,057.23 -11,822.40 -9,73202 5,954,210.76 339,283.75 0.27 15,312.11 MWD+1FR-AK-CAZ-SC(4) 16,136.27 75.91 201.94 7,150.83 7,080.39 -11,907.44 -9,766.13 5,954,126.43 339,247.94 0.27 15,399.18 MWD+IFR-AK-CAZ-SC(4) 18,229.93 75.97 202.45 7,173.58 7,103.14 -11,991.56 -9,800.45 5,954,04302 339,211.94 0.53 15,485.68 MW1)+IFR-AK-CAZ-8C (4) 18,324.38 75.98 20233 7,196.47 7,126.03 -12,076.17 -9,835.65 5,953,959.14 339,175.05 029 15,573.12 MWD+IFR-AK-CAZ-SC(4) 18,419.05 75.97 203.92 7,219.41 7,148.97 -12.160.50 -9,872.02 5,953,87556 339,137.00 1.22 15,661.10 MWD+IFR-AK-CAZ-$C(4) 18,513.50 75.90 203.62 7,242.37 7,171.93 -12,244.35 -9,90895 5,953,792.47 339,098.40 0.32 15,749.07 MWD+IFR-AK-CAZ-SC(4) 18,607.46 75.95 202.42 7,265.22 7,194.78 -12,328.23 -9,944.59 5,953,709.33 339.061.09 1.24 15,836.23 MWD+IFR-AK-CAZ-SC(4) 18,701.96 76.69 199.84 7,287.57 7,217.13 -12,413.87 -9,977.68 5.953,624.36 339.026.28 277 15,923.11 MWD+IFR-AK-CAZ-SC(4) 18,796.52 76,73 197.04 7,309.31 7,238.87 -12,501.16 -10.006.79 5,953,53770 338,99543 2.88 16,008.68 MWD+IFR-AK-CAZ-SC(4) 18,89061 76.70 197.21 7,33094 7,260.50 -12,58867 -10,033.75 5,953,45075 338,966]2 0.18 16,093.05 MWD+IFR-AK-CAZ-SC (4) 18,985.10 77.49 195.34 7,352.04 7,281.60 -12,677.08 -10,059.56 5,953,36269 338,939.14 2.10 16,177.37 MWD+IFR-AK-CAZ-SC(4) 19,078.16 78.08 194.43 7,371.73 7,301.29 -12,764.98 -10,082.92 5,953,275.48 338.914.02 1.15 16,259.72 MWD+IFR-AK-CAZ-SC(4) 10252017 10.22:26AM Page 7 COMPASS 5000.14 Build 85 Conocol"hillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: CD5-316 North Reference: True Wellbore: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB7 Database: OAKEDMP2 Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI -S +E/ -W Northing Easting DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (-1100') (ft) Survey Tool Name 19,173.32 7862 19321 7,390.95 7,320.51 -12.855.48 -10,105.18 5,953,18545 338.889.95 1.38 16,343.36 MWD*IFR-AK-CAZ-SC (4) 19,269.82 79.19 192.31 7,409.52 7.33998 -12,947.84 -10,126.10 5,953,093.54 338,867.19 1.09 16427.55 MWD*IFR-AK-CAZ-SC(4) 19,364.13 79.96 190.33 7426.58 7,356.14 -13,038.78 -10,144.30 5953,00299 338,847.16 2.22 16,508.92 MWD+IFR-AK-CAZ-SC(4) 19,456.36 79.90 188.56 7,442.71 7,372.27 -13,128.36 -10,159.20 5,952.913.74 336,83067 1.89 16,587.11 MWD+IFR-AK-CAZSC(4) 19,505.68 79.89 187.12 7,451.36 7,380.92 -13,176.46 -10,165.82 5,952,865.78 338,822.88 2.87 16,628.22 MWD+iFR-AK-CAZ-SC(4) 19,537.00 79.89 187.12 7456.86 7,388.42 -13,20705 -10,169.65 5,952,835.27 338,818.45 0.00 16,65411 NQT an Actual $0ryey 8314" open rinal Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. U Yes ❑ No 1 have checked to the best of my ability that the following data Is correct O Surface Coordnates 2] Declination & Convergence Surveys from 13,873.32 to 19.505 68 are p GRS Survey Corrections BHI surveys Survey Tool Codes BrandonTem�e DlgitallysignedbyBrandonTemple SLB DE: p Date: 2017.10.2511:00:15 -08'00' Client Representative Wei feng Dai Date: 10/252017 10:22:26AM Page 8 COMPASS 5000 14 Build 85 [FINAL RECEIVED OCT 30 2017 AOGCC ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad C135-31fj PN C!35-310' V,F} ConocoPhillips Definitive Survey Report 24 October. 2017 21 7040 28759 d' ConocoPhillips Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: COS Alpine West Pad Well: CD5-316 Wellbore: CD5-316PB1 Design: CD5-316PB1 ConocoPhillips Definitive Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CDS-3116 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Iroject Western North Slope, North Slope Alaska, United States lap System: US State Plane 1983 System Datum: Mean Sea Level ieo Datum: North American Datum 1983 Using Well Reference Point lap Zone: Alaska Zone 4 Using geodetic scale factor Yell CD5-316 Azi Audit Notes: (`) From Version: 1.0 Yell Position -NAS 0.00 usft Northing: 5,965,580.48 usft Latitude: 70° 18'4&300 1 lush) +E/ -W 0.00 usft Easting: 1,489,283.58 usft Longitude: 151° 13'29.757 V losition Uncertainty MWD+IFR-AK-CAZ-SC 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 ust Wellbore CD5-316P81 Magnetics Model Name Sample Data Declination (°) BGGM2017 7/30/2017 17.06 Design CD5-316PB1 Date 10/24/2017 Azi Audit Notes: (`) From Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) -NAS Tool Name (usft) lush) 98.80 36.44 0.00 Dip Angle Field Strength (°) (nT) 80.79 57,453 Tie On Depth: +EAW (usft) 0.00 3644 Direction (°) 220.00 Survey Program Date 10/24/2017 Azi (usft) (`) From To 0.00 0.00 98.80 (usft) lush) Survey (Wellbore) Tool Name Description Survey Date 98.80 1,076.25 CD5-316 Srvy 1 - SLB_GWD70 (CD5-31 GYD-GC-SS Gyrodata gyro single shots 7/25/2017 10:27 1,133.92 2,269.67 CD5-316 Srvy 2-SLBMWD+GMAG(C MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/25/201710:29 2,386.06 13,800.59 CD5-316 Srvy 3- SLB_MWD_GMAG(CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 7/30/201710:19 13,873.32 19,505,68 CD5-316P81 Sivy1-BHI_MWO+IFR+M MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 6/12/2017 1:44: Survey MD Inc Azi (usft) (`) 1`) 36.44 0.00 0.00 98.80 065 306.44 115.50 0.58 299.53 20" 540.13 -16.14 150.56 0,47 279.10 245.62 0.76 217.62 335.79 174 206.74 427.34 320 208.74 519.79 376 200.76 611.07 409 200.45 704.45 644 205.35 TVD TVDSS +NAS (usft) (usft) (usft) 36.44 -34.00 0.00 98.80 2836 0.21 115.50 45.06 0.31 150.56 80.12 0.42 245.61 175.17 -0.02 335.76 265.32 -1.72 427.22 35678 -5.20 519.50 449.06 -1029 610.57 540.13 -16.14 703.55 633.11 -24.00 10242017 2:27: 19PM Page 2 COMPASS 5000.14 Build 85 Map Map Vertical +EI -W Northing Easting OLS Section (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 0.00 5,965,58048 1,489,28358 0.00 0.00 UNDEFINED -0.28 5,965,580.70 1,489.283.30 1.04 0.02 GYD-GC-SS(1) -0.43 5,965,580.80 1,489,283.15 0.61 0.04 NOT 80 AC1D8(5111yH1 -0.73 5,965,580.91 1,489,282.86 061 0.15 GYD-GC-SS(1) -1.50 5,965,580.49 1,489,282.08 0.71 0.98 GYD-GC-SS(1) -2.48 5.965,57881 1,489,281.06 1.11 2.91 GYD-GC-SS(1) 4.34 5,965.575.37 1,489,279.14 1.60 6.77 GYD-GC-SS(1) 865 5.965.570 32 1489,276.72 0.80 12.16 GYD-GC-SS(1) -8.85 5,965,564.52 1,489,27441 0.36 18.05 GYD-GC-SS(1) -12.25 5,965,55674 1,489,27085 2.56 26.26 GYD-GC-SS(1) 10242017 2:27: 19PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConomPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CDS Alpine West Pad MD Reference: Well: CD5-316 North Reference: Wellbore: CD5-316PB1 Survey Calculation Method: Design: CDS-316PB1 Database: Survey Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CDS-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 1024/2017 Z27:19PM Page 3 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (") (usft) (usft) (usft) (usft) (ft) (ft) (°1100.) (ft) Survey Tool Name 798.21 8.71 21765 796.49 726.05 -34.37 -18.84 5,965.546.50 1,489,26405 2.96 38.44 GYD-GC-SS(1) 886.96 10.41 220.02 884.00 813.56 -45.83 -28.11 5,965,535.22 1,489,254.56 1.97 53.18 GYD-GC-SS(1) 980.35 13,09 219.37 975.43 904.99 -60.47 -40.24 5,965,520.83 1,489,242.13 2.87 72.19 GYD-GC-SS(1) 1,076.25 14.64 218.95 1,088.53 99809 -78.30 -54.75 5,965.503.31 1,489.227.27 1.62 95.17 GYD-GC-SS(1) 1,133.92 15.05 21725 1,124.28 1,053.84 -89.92 -63.86 5,965,491.87 1,489,217.92 104 10994 MWD+IFR-AK-CAZ-SC(2) 1,228.42 17.38 216.17 1,215.01 1,144.57 -11109 -79.62 5,965,471.03 1,489,201.74 249 136.28 MWD+IFR-AK-CAZ-SC(2) 1,322.21 2022 214.80 1,30379 1,233.35 -13571 -97.14 5.965,44676 1,489,183.73 3.05 16640 MWD+IFR-AK-CAZ-SC(2) 1,416.81 22.32 213.82 1,391.94 1,321.50 -164.06 -11647 5.965.418.81 1489,183.84 2.25 200.54 MWD+IFR-AK-CAZ-SC(2) 1,51100 25.02 211.11 1,478.20 1,407.76 -195.98 -136.72 5,965,387.31 1,489,142.95 3.09 238.01 MWD+IFR-AK-CAZ-SC (2) 1,605.89 27.26 210.76 1,563.38 1,492.94 -231.84 -158.21 5,965,351.89 1,489,120.75 2.37 279.29 MWD+IFR-AK-CAZ-$C (2) 1,700.39 2985 210.65 1,646.38 1,575.94 -270.67 -181.27 5965.313.53 1,489,09691 2,74 323.7 MWD+IFR-AK-CAZ-SC(2) 1,794.72 31.79 211.13 1,727.3B 1,658.94 -312.14 -206.09 5,965,272.57 1,489.07127 2.7 371.59 MWD+1FR-AK-CAZ-SC(2) 1,888.64 31.72 211.24 1,807.24 1736.80 -354.43 -23168 5,965,230.81 1,489,044.83 0.10 42043 MWD+IFR-AK-CAZ-SC(2) 1,963.09 34.92 211.36 1,886.16 1,815.72 -398.75 -25863 5,965,187.04 1,489,016.99 3.39 471.71 MWD+IFR-AK-CAZ-SC(2) 2,077.54 38.08 212.07 1,962.07 1,691.63 -446.53 -288.17 5.965,139.87 1,488,986.50 3.38 527.30 MWD+IFR-AK-CAZ-SC(2) 2,172.54 39.77 214.71 2,035.98 1,965.54 -496.34 -321.04 5,965,090.74 1.488,952.64 249 586.58 MWD+IFR-AK-CAZ-SC(2) 2:267.09 41.58 217.53 2,17.69 2,037.25 -54609 -357.38 5,965,041.73 1,488,915.31 2.73 648.05 MWD+IFR-AK-CAZ-SC (2) 2.28967 42.28 216.89 2,124.49 2.054.05 -558.11 -366.50 5.9M,029 90 1,488,90595 3.63 663.12 MWD+IFR-AK-CAZ-SC 2 2,360.00 42.36 217. B7 2,176.50 2,106.06 -595.74 -395.24 5,964,992.86 1488,87645 0.94 710.42 )jO-j BD Aclual$WVBy 13 3/8" x 16" 2,386.06 42.39 218.23 2.195.75 2.125.31 -609.7 -406.07 5,964.979.25 1488,865.35 0.94 72797 MM+IFR-AK-CAZ-SC(3) 2,452.08 43.15 218.86 2,244.21 2,173.77 644.63 -434.01 5,964,944.76 1,488,836.72 1.32 772.79 MWD+IFR-AK-CAZ-SC(3) 2,54772 46.71 21849 2,311.91 2,24147 697.36 -476.20 5.954,892.90 1,488,793.47 3.73 84030 MWD+1FR-AK-CAZ-SC(3) 2,641.16 4840 219.76 2,374.97 2,304.53 -750.84 -51972 5,964,840.31 1,488,748.89 2.07 909.24 MWD+IFR-AK-CAZ-SC(3) 2,735.35 51.15 220.19 243579 2,365.35 -805.94 -565.92 5,964,786.15 1,488,701.60 2.94 981.15 MWDNFR-AK-CAZ-SC(3) 2,829.83 53.68 221.57 2,493.42 2,422.98 -862.53 614.93 5,964,730.57 1,488,651.46 2.92 1,056.00 MWD+IFR-AK-CAZ-SC (3) 2,924.19 55.90 224.14 2,54782 2,477.38 -919.02 -667.37 5,964,675.15 1,488,597.90 3.24 1,132.99 MWD+IFR-AK-CAZ-SC(3) 3,018.35 58.10 225.51 2,599.11 2,528.67 -975.02 -723.04 5,964,62029 1488,541.11 264 1,211.67 MWD+IFR-AK-CAZ-SC(3) 3.110.07 60.11 226.51 2,646.20 2,57576 -1,029.67 -779.67 5,964,566.79 1,488,483.40 2.38 1,289.93 MWD+IFR-AK-CAZ-SC(3) 3,202.95 62.28 226.86 2,690.95 2,620.51 -1,085.50 -838.88 5,964,512.17 1,48842308 2.36 1X0.76 MWD+IFR-AK-CAZ-SC(3) 3.298.68 64.25 227.52 2,734.01 2,663.57 -1,143.59 -90180 5,964,455 35 1,488,35921 2.15 1,455.58 MWD+IFR-AK-CAZ-SC(3) 3,390.58 66.82 229.53 2,772.07 2,701.63 -1,198.97 -964.28 5,964,401.25 1,488,295.44 343 153829 MWD+IFR-AK-CAZ-SC(3) 3,485.15 69.06 229.99 2,607.59 2,737.15 -1,255.59 -1,031.18 5,964,346.00 1,488,227.41 2.41 1.62466 MWD+IFR-AK-CAZ-SC(3) 3,57971 6967 229.04 2.840.91 2.770.47 -1,313.04 -1,09848 5,964,289.91 1,488,158.97 1.14 1,711.94 MWD+1FR-AK-CAZ-SC(3) 3,673.45 7078 22863 2,87263 2,802.19 -1,371.10 -1,164.89 5,96423320 1488,091.42 1.25 1799.10 MWD+IFR-AK-CAZ-SC(3) 3,76464 72.03 228.00 2,90171 2,831.27 -1428.58 -1,22943 5,964,177.04 1,488,025.73 1.52 1,B84.62 MWD+IFR-AK-CAZ-SC(3) 3,858.96 7197 226.95 2,93085 2.86041 -1,489.21 -1,295.54 5,964,117.76 1,47,958.42 1.06 1,973.56 MWD+IFR-AK-CAZ-SC(3) 3,95382 7225 225.76 2,95999 2,889.55 -1,551.52 -1,360.86 5.964,056.78 1,487,891.86 123 2,063.28 MWD+IFR-AK-CAZ-SC(3) 4,047.32 72.60 224.30 2,988.23 2,917.79 -1,614.51 -1423.92 5,963,995.07 1,487,827.56 1.53 2,152.07 MWD+IFR-AK-CAZ-SC (3) 4,141.31 72.55 223.34 3,016.38 2,945.94 -1,879.21 -1,486.01 5,963,931.64 1,487,764.18 0.98 2,241.54 MWD+IFR-AK-CAZ-SC (3) 4,23841 7268 223.08 3,04479 2,974.35 -1745.36 -1548.15 5,963,8%76 1,487,700.73 0.29 2,332.16 MWD+IFR-AK-CAZ-SC(3) 1024/2017 Z27:19PM Page 3 COMPASS 5000.14 Build 85 Company: ConowPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316PB1 Design: CD5-316PB1 Survey ConocoPhillips Definitive Survey Report Local Coordinate Reference: Well CD5-316 TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 Vertical DLS Section (°1100-) (ft) Survey Tool Name 025 2,422.02 MWD+IFR-AK-CAZ-SC(3) 0.45 2,51049 MWD+IFR-AK-CAZ-SC(3) 0.53 2,599.90 MWD+IFR-AK-CAZ-SC(3) 0.60 2,690.44 MWD+IFR-AK-CAZ-SC(3) 0.81 2,77643 MWD+IFR-AK-CAZ-SC(3) 0.64 2,867.61 MWD+IFR-AK-CAZ-SC(3) 062 2,958.23 MWD+IFR-AK-CAZ-SC(3) 0.78 3,047.59 MWD+IFR-AK-CAZ-SC(3) D.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 0.35 3,226.38 MWD+IFR-AK-CAZ-SC(3) 0.64 3,315.44 MWD+IFR-AK-CAZ-SC(3) 0.49 3,40362 MWD+IFR-AK-CAZ-SC(3) 0.47 3,493.24 MWD+IFR-AK-CAZ-SC(3) 0.04 3,581.88 MWD+IFR-AK-CAZ-SC(3) 0.29 3,671.31 MWD+IFR-AK-CAZ-SC(3) 0.04 3,76044 MWD+IFR-AK-CAZ-SC(3) 0.48 3,849.65 MWD+IFR-AK-CAZ-SC(3) 0.36 3,93885 MWD+IFR-AK-CAZ.SC(3) 0.51 4,027.44 MWD+IFR-AK-CAZ-SC (3) 1.02 4,11607 MWD+IFR-AK-CAZ.SC(3) 0.03 4,204,38 MWD+IFR-AK-CAZ-SC (3) 056 4,29357 MWD+IFR-AK-CAZ-SC(3) 0.46 4,382.18 MWD+IFR-AK-CAZ-SC(3) 033 4,471.86 MWD+IFR-AK-CAZ-SC 13) 044 4,560.86 MWD+IFR-AK-CAZ-SC(3) 0.40 4,648.90 MWD+IFR-AK-CAZ-SC (3) 042 4,737.81 MWD+IFR-AK-CAZ-SC(3) 0.16 4,827.16 MWD+IFR-AK-CAZ-SC(3) 040 4.91544 MWD+IFR-AK-CAZ-SC(3) 0.01 5.00489 MWD+IFR-AK-CAZ-SC(3) 0.04 5,093.83 MWD+IFR-AK-CAZ-SC(3) 0.06 5,184.32 MWD+IFR-AK-CAZ-SC(3) 0.77 5,27429 MWD+IFR-AK-CAZ-SC(3) 1.08 5,%0.95 MW0+IFR-AK-CAZ-SC(3) 0.16 5,450.64 MWD+IFR-AK-CAZ-SC(3) 029 5,539.89 MWD+IFR-AK-CAZ-SC(3) 0.08 5,628.85 MWD+IFR-AK-CAZ-SC(3) 067 5,717.79 MWD+IFR-AK-CAZ-SC(3) 0.99 5,805.95 MWD+IFR-AK-CAZ-SC(3) 0.69 5,894.25 MWD+IFR-AK-CAZ-SC(3) 1012412017 2:27:19PM Page 4 COMPASS 5000.14 Build 85 Map Map MD Inc An TVD TVDSS -NI-S +El -W Northing Easting (usft) V) (°) (usft) (usft) (usft) (usft) (ft) (ft) 433072 7254 223.28 3,072.90 3.002.54 -1,810.99 -1.609.74 5,963,80239 1487,637.84 4,423.63 72.56 223.72 3.100.84 3,030.40 -1,875.28 -1,670.75 5,983,739.34 1,4137 575 55 4,517.57 72.58 224.24 3,128.98 3,058.54 -1,939.78 -1,732.99 5,963.676.12 1,487,512.03 4,61269 72.58 223.64 3,157.45 3,087.01 -2,005.13 -1,795.96 5,963,612.06 1,487,44776 4,705.14 72.60 224.42 3,185.12 3,114.68 -2,068.55 -1,857.27 5.963,54988 1,487,385.19 4,798.99 72.07 224.13 3,213.59 3,143.15 -2.132.58 -1,919.70 5,963,487.13 1,487,321.49 4,894.64 71.59 224.49 3,243.42 3,172.98 -2,197.61 -1,983.18 5,963,42340 1,487,25671 4,989.18 71.53 225.26 3,273.33 3,202.89 -2,261.16 -2,046.46 5,963,361.13 1,487,192.17 5083.50 71.53 225.44 3.303.21 3,232.77 -2,324.04 -2,110.11 5,983,29956 1,487,127.28 5,178.53 71.56 22579 3,333.29 3,262.85 -2,387.09 -2,174.53 5,963,237.82 1,487,871.61 5,272.95 71.57 226.43 3,363.15 3,292.71 -2,449.19 -2,239.08 5,96317704 1,486,99582 5,366.45 71.53 225.95 3,392.74 3,322.30 -2,510.59 -2,303.09 5,963,116.94 1,486.930.60 5,46140 71.56 225.48 3,422.80 3,352.36 -2,573.47 -2,367 56 5,963,055.37 1,486.864.87 5,555.27 71.56 225.52 3.45249 3,382.05 -2,635.89 -2,431.08 5,962,994.25 1,486.800.12 5,649.95 71.56 225.23 3,482.44 3,412.00 -2,698.99 -2,495.01 5,962,93245 1,486,734.94 5,744.30 71.57 225.19 3,512.27 3,44183 .2,762.04 -2,558.53 5,962,870.70 1.486.670.17 5,83837 71.53 225.67 3,542.17 3,471.73 -2.824.93 -2,62237 5,962,809.11 1,486,605.08 5,93326 71.50 225.31 3,572.13 3,501.69 .2,887.76 -2,686.27 5,962,74759 1,486,53993 6,027.10 71.57 225.81 3,601.85 3,531.41 -2,950.08 -2,749.83 5,962,686.57 1,486,475.14 6,120.92 71.56 224.80 3,631.52 3,561.08 -3.01268 -2,813.09 5,962,625.26 1486,41063 6,214.35 71.53 224.80 3,661.10 3,590.66 -3,075.56 -2,875.54 5,962,563.65 1,486,346.93 6,308.67 71.56 224.24 3,690.96 3,620.52 .3,139.35 -2,938.28 5,962,501.13 1,486,28293 6,402.34 7163 224.69 3,72053 3,650.09 .3,202,78 -3,000.53 5,962,438.97 1.486,21941 6,497.20 7140 224.47 3,750.61 3,680.17 -3,266.86 -3,06368 5,962,376.18 1,486,154.99 6,591.37 71.57 224.87 3,780.51 3,710.07 -3,330.37 -3,126.46 5,962,313.96 1486,090.96 6684.55 71.51 225.26 3,810.02 3,739.58 -3,392.80 -3,18902 5,962,252.81 1,486,027.15 6,77869 7144 22485 3839.93 3,769.49 -3,455.85 -3,252.20 5,962,191.04 1,485,96272 6,873.27 71.44 224.69 3,870.03 3,799.59 -3,51951 -3,315.35 5,962,128.68 1,485,898.31 6,966.71 71.51 225.08 3,899.72 3,829.28 -3,58228 -3,377.87 5,962,067.18 1,485,834.54 7,06141 71.50 225.09 3,929.76 3,859.32 -3,645.69 -3,441.47 5,962,005.07 1485,769.68 7,155.57 71.47 225.07 3,95966 3,889.22 -3,708.74 -3,50469 5,961,943.31 1,485,705.21 7,251.39 7142 225.05 3,990.15 3,919.71 -3.772.90 -3,568.99 5,961,880.46 1485,63964 7,346.55 72.03 225.48 4,019.99 3,949.55 -3.836.50 -3,633.18 5,961,818.17 1,485,574.18 7,438.01 7198 224.44 4,048.25 3,977.81 -3,898.05 -3,69465 5,961,757.87 1485,511.50 7,53262 71.96 224.60 4,077.53 4,007.09 -3,962.20 -3,757.73 5,961,695.01 1,485,447.15 7,626.80 7199 224.89 4,106.67 4,036.23 -4,025.80 -3,820.77 5,961,632.69 1,485,382.84 7,72069 71.99 224.97 4,135,70 4,065.26 -4,089.02 -3,88383 5,961,570.76 1485,318.52 7,814.61 72.01 225.63 4,164.73 4,094.29 -4.151.85 -3,947.32 5,961,509.23 1,485,253.79 7,907.83 72.02 226.60 4,193.51 4,123.07 -4,213.31 -4,011.22 5,961449.07 1,485,18866 8,001.23 71.98 225.92 4,222.37 4,151.93 -4,27472 4,07540 5,961,388.97 1,485,123,27 Vertical DLS Section (°1100-) (ft) Survey Tool Name 025 2,422.02 MWD+IFR-AK-CAZ-SC(3) 0.45 2,51049 MWD+IFR-AK-CAZ-SC(3) 0.53 2,599.90 MWD+IFR-AK-CAZ-SC(3) 0.60 2,690.44 MWD+IFR-AK-CAZ-SC(3) 0.81 2,77643 MWD+IFR-AK-CAZ-SC(3) 0.64 2,867.61 MWD+IFR-AK-CAZ-SC(3) 062 2,958.23 MWD+IFR-AK-CAZ-SC(3) 0.78 3,047.59 MWD+IFR-AK-CAZ-SC(3) D.18 3,136.67 MWD+IFR-AK-CAZ-SC(3) 0.35 3,226.38 MWD+IFR-AK-CAZ-SC(3) 0.64 3,315.44 MWD+IFR-AK-CAZ-SC(3) 0.49 3,40362 MWD+IFR-AK-CAZ-SC(3) 0.47 3,493.24 MWD+IFR-AK-CAZ-SC(3) 0.04 3,581.88 MWD+IFR-AK-CAZ-SC(3) 0.29 3,671.31 MWD+IFR-AK-CAZ-SC(3) 0.04 3,76044 MWD+IFR-AK-CAZ-SC(3) 0.48 3,849.65 MWD+IFR-AK-CAZ-SC(3) 0.36 3,93885 MWD+IFR-AK-CAZ.SC(3) 0.51 4,027.44 MWD+IFR-AK-CAZ-SC (3) 1.02 4,11607 MWD+IFR-AK-CAZ.SC(3) 0.03 4,204,38 MWD+IFR-AK-CAZ-SC (3) 056 4,29357 MWD+IFR-AK-CAZ-SC(3) 0.46 4,382.18 MWD+IFR-AK-CAZ-SC(3) 033 4,471.86 MWD+IFR-AK-CAZ-SC 13) 044 4,560.86 MWD+IFR-AK-CAZ-SC(3) 0.40 4,648.90 MWD+IFR-AK-CAZ-SC (3) 042 4,737.81 MWD+IFR-AK-CAZ-SC(3) 0.16 4,827.16 MWD+IFR-AK-CAZ-SC(3) 040 4.91544 MWD+IFR-AK-CAZ-SC(3) 0.01 5.00489 MWD+IFR-AK-CAZ-SC(3) 0.04 5,093.83 MWD+IFR-AK-CAZ-SC(3) 0.06 5,184.32 MWD+IFR-AK-CAZ-SC(3) 0.77 5,27429 MWD+IFR-AK-CAZ-SC(3) 1.08 5,%0.95 MW0+IFR-AK-CAZ-SC(3) 0.16 5,450.64 MWD+IFR-AK-CAZ-SC(3) 029 5,539.89 MWD+IFR-AK-CAZ-SC(3) 0.08 5,628.85 MWD+IFR-AK-CAZ-SC(3) 067 5,717.79 MWD+IFR-AK-CAZ-SC(3) 0.99 5,805.95 MWD+IFR-AK-CAZ-SC(3) 0.69 5,894.25 MWD+IFR-AK-CAZ-SC(3) 1012412017 2:27:19PM Page 4 COMPASS 5000.14 Build 85 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316PB1 Design: CD5-316PB1 Survey ConocoPhillips Definitive Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CDS-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 101242017 2.27.19PM Page 5 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +NIS +E1 -W Northing Easting DLS Section (usft) (°) V) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 8,09552 71.84 22557 4,251.65 4,181.21 .4,337.27 413960 5961,327.73 1,485,057,83 0.38 5,983.42 MWD+1FR-AK-CAZ-SC(3) 8,19064 71.52 225.34 4,281.55 4,241.11 -4.400.61 4,203.95 5,961,26570 1,484.99222 0.41 6,073.31 MWD+1FR-AK-CAZ-SC(3) 8,283.93 71.50 225.47 4,311.13 4,240.69 -4,462.73 -4,26695 5,961,20487 1,484 927 98 0.13 6.161.40 MWD+IFR-AK-CAZ-SC(3) 8,378.39 71.47 226.52 4,341.13 4,270.69 -4,524% -4,331.38 5,961,14395 1484862.32 1.05 6,250.47 MWD+1FR-AK-CAZ-SC(3) 8,472.66 7144 227.46 4,371.11 4,300.67 -0,585.92 -4,396.73 5.961,08432 1,464,795.76 0.95 8,339.18 MWD+IFR-AK-CAZ-SC(3) 8,566.86 71.41 227.16 4,401.12 4,330.68 -4646.46 -4,462.37 5,961.025.12 1484.728.93 0.30 6,427.75 MWD+IFR-AK-CAZ-SC(3) 8,661.19 71.63 227.01 4,431.02 4,360.58 -4707.38 4,52789 5,960,965.53 1,484.66220 0.28 6,516.53 MWD+IFR-AK-CAZ-SC 13) 8,755.41 71.57 225.59 4,46076 4,390.32 -4,769.15 -0,592.52 5,960,905.09 148459639 1.43 6,605.39 MWD+IFR-AK-CAZ-SC(3) 884996 7147 225.07 4,490.73 4,420.29 -4,832.19 4,656.29 5.960,843.35 1,484,531.32 0.53 6,694.68 MWD+IFR-AK-CAZ-SC(31 8,943.68 71.41 224.71 4,52056 4,450.12 -4.695.13 -4,719.00 5,960,78168 1484467.36 0.37 6,783.20 MWD+1FR-AK-CAZ-SC(3) 9,03762 7148 224.88 4,550.46 4,480.02 -4958.33 -4,781.74 5,960,71976 1464403.36 0.19 6,87195 MWD+1FR-AK-CAZ-SC(3) 9,131.63 71.47 22566 4,580.33 4,509.89 -5,021.06 -4,845.07 5,950658.32 1,48433879 0.79 6,960.71 MWD+IFR-AK-CAZ-SC(3) 9,22641 7154 226.20 4,610.39 4,539.95 -5,083.58 -4.909.65 5,960,59712 1,484,272.97 0.55 7,050.11 MWD+IFR-AK-CAZ-SC(3) 9,32096 71.47 226.69 4,640.39 4,569.95 -5,145.37 -4,974.63 5,9W,536 66 1,484,206.76 0.50 7,139.21 MWD+IFR-AK-CAZ-SC(3) 9,416.14 71.54 227.20 4,670.58 4,600.14 -5,206.99 -5,040.59 5,960,476.38 1,484.139.58 0.51 7,228.81 MWD+1FR-AK-CAZ-5C (3) 9,509.75 71.54 226.36 4,70022 4,629.78 -5,267.79 -5,105.29 5,960,416.90 1,484,073.67 0.85 7,316.98 MWD+IFR-AK-CAZ-SC(3) 9,604.30 71.47 226.05 4,730.21 4,659.77 -5,329.85 -5,170.02 5,960,356.16 1,4U,007 72 0.32 7,406.13 MWD+IFR-AK-CAZ-SC (3) 9,69673 71.53 225.47 4,760.18 4,68974 -5.392.33 -5,234.17 5,960,295.00 1,483,942.32 0.59 7,495.22 MWD+IFR-AK-CAZ-SC(3) 9,793.17 71.51 224.99 4,790.11 4,719.67 -5,45541 -5,297.76 5,960,233.21 1,483,87748 0.48 7,584.42 MWD+1FR-AK-CAZ-SC(3) 9,886.23 71.51 224.84 4,820.26 4,749.82 -5,51925 -5,361.42 5,960,170.67 1,483,812.56 0.15 7.674.24 MWD+IFR-AK-CAZ-SC(3) 9,981.40 71.47 224.70 4,649.84 4,779.40 -5,581.97 -5,423.64 5,960 109 21 1,483,]49.09 0.15 7,76229 MWD+1FR-AK-CAZ-SC(3) 10,07546 71.54 225.61 4.879.68 4,809.24 -5,64488 -5,486.88 5.960,N7 60 1,483,684.60 0.92 7,851.13 MWD+IFR-AK-CAZ-SC(3) 10,169.70 71.48 225.41 4,909.56 4,839.12 -5,707.51 -5,550.64 5,959,986.27 1,48361960 0.21 7,940.09 MWD+IFR-AK-CAZ-SC(3) 10,261.84 71.54 225.24 4,938.79 4,868.35 -5,768.95 -5,61278 5,959,926.10 1,483,55624 0.19 8,027.09 MWD+IFR-AK-CAZ-SC(3) 10,35414 71.54 223.92 4,96801 4,89757 -5,831.31 -5,674.23 5,959,864.99 1,483,493.55 1.36 8,114.36 MWD+IFR-AK-CAZ-SC(3) 10,44848 7151 223.01 4,997.91 4,927.47 -5,896.25 -5,73538 5,959.801.31 1,483,430.71 0.92 8,203.68 MWD+IFR-AK-CAZ-SC(3) 10.542.93 7144 223.34 5,027.92 4,95]48 -5,98156 -5,79].06 5,959,737.25 1,483,368.14 0.34 8,293.10 MW0+IFR-AK-CAZ-SC (3) 10.637.66 71.49 222.95 5,058.07 4,987.63 -6,027.08 -5,658.47 5,959,672.98 1,483,305.42 039 8,38276 MWD+IFR-AK-CAZ-SC(3) 10,732.15 71.54 22340 5,088.07 5,017.63 -6,09242 -5,919.78 5,959,60889 1,483.242.82 0.46 8,472.23 MWD+IFR-AK-CAZ-SC(3) 10.826.66 71.47 223.51 5,118.05 5,047.61 -6,157,49 -5,98142 5,959,545.09 1,483,179.88 0.13 8.56169 MWD+IFR-AK-CAZ-SC(3) 10,92049 71.51 224.37 5.147.84 5,077.40 -6,221.55 -6,043.16 5,959,482.28 1483,116.87 0.87 8,65046 MWD+1FR-AK-CAZ-SC(3) 11015.80 71.57 225.09 5,178.02 5,107.58 -6,285.78 -6,106.79 5.959,419 35 1,483,05197 0.72 8,740.55 MWD+IFR-AK-CAZ-SC(3) 11,110.71 7154 225.23 5,208.05 5,137.61 -6,349.27 -6,170.63 5,959,357.17 1,482,986 86 0.14 8,830.22 MWD+IFR-AK-CAZ-SC (3) 11,204.34 71.51 225.98 5,237.72 5,167.28 -6,411.39 -6,234.08 5,959,296.34 1,482,922.18 0.76 8,918.60 MWD+IFR-AK-CAZ-SC (3) 11,298.22 71.51 225.54 5,26]49 5,197.05 -6,473.51 -6,297.87 5,959,23552 1,482,857.16 0.44 9,007.19 MWD+IFR-AK-CAZ-SC(3) 11,39243 7147 226.35 5,29740 5,226.96 -6535.63 -6,362.07 5959,1]4]1 1482,791.72 0.82 9,096.04 MWD+1FR-AK-CAZ-SC(3) 11486.64 71.57 226.81 5,32].26 5,256.82 -6,597.04 -6,426.97 5,959,11462 1,482,72561 0.48 9,184.81 MWD+IFR-AK-CAZ-SC(31 11,581.31 71.51 22571 5,357.24 5,286.80 -6,659.13 -6,491.85 5,959,05386 1482,659.50 1.10 9,274.07 MWD+IFR-AK-CAZ-SC(3) 11675.58 71.54 226.01 5,387.11 5,31667 -6,721A0 -6,556.01 5,958,992.90 1,482,594.10 0.30 9,363,01 MWD+IFR-AK-CAZ-SC(3) 11,769.70 7145 226.05 5,416.98 5,346.54 5,783.36 -6,620,25 5,958,932.24 1,482,52863 0.10 9,451.77 MWD+IFR-AK-CAZ-SC(3) 101242017 2.27.19PM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-316 North Reference: Wellbore: CD5-316PB1 Survey Calculation Method: Design: CD5-316PB1 Database: Well CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CDS-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Survey Map Map Vertical MD Inc AN TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (') (') (usft) (usft) (usft) (usft) (ft) (ft) ("/100-) (ft) Survey Tool Name 11,864.23 71.54 228.31 5,446.99 5.376.55 -6.845.43 -6,68493 5.958 B71.49 1,482.462]2 0.28 9,540.89 MWD+IFR-AK-CAZ-SC(3) 11,957.80 71.51 225.67 5,476.64 5,406.20 -6,90709 -6,748.76 5,958,811.14 1482,397.6] D65. 9,629.15 MWD+IFR-AK-CAZ-SC(3) 12,052.51 71.56 228.14 5,506 64 5,436.20 -6,96960 -6,813.27 5,958,749.94 1,482,331.91 047 9,718.51 MWD+IFR-AK-CAZ-SC(3) 12,146.60 71.54 225.89 5,536.41 5,46597 -7,031.59 -6,877.49 5,958,68927 1,482,266.46 025 9,807.27 MWD+IFR-AK-CAZ-SC(3) 12,241.51 71.53 22534 5,566.4] 5496.03 -7,094.55 -6,941.83 5,958,627.61 1,482,200.88 055 9,80.87 MWD+IFR-AK-CAZ-SC(3) 12,335.11 71.57 225.41 5,596.10 5,525.66 -7,156.93 -7,005.02 5,958,566.53 1,482,136.45 0.08 9,985.26 MWD+IFR-AK-CAZ-SC (3) 12,429.97 71.56 225.27 5,626.09 5,555.65 -7,220.18 -7,0903 5,958,504.58 1,482.071.18 0.14 10.074.87 MWD+IFR-AK-CAZ-SC(3) 12.523.83 71.47 224.14 5,65585 5,58541 -7,283.45 -7,131.65 5,958,442.59 1482,007.31 1.15 10,163.58 MWD+IFR-AK-CAZ-SC(3) 12,618.97 71 51 224.02 5,686.0 5,615.62 -7,348.26 -7,194.41 5,958,379.06 1,481.943 26 0.13 10,253.57 MWD+IFR-AK-CAZ-SC (3) 12,711 50 71.54 224.33 5,715.38 5,644.94 -7,411.20 -7,255.57 5,958,317.36 1 481,880.85 0.32 10,341.10 MWD+IFR-AK-CAZ-SC (3) 12,806.89 7165 224.34 5,745.50 5,675.0 -7,47594 -7,318.82 5,958,253.92 1,481,816.31 0.12 10,431.35 MWD+IFR-AK-CAZ-SC(3) 12,901.29 72.05 224.84 5,774.90 5,704.46 -7,539.82 -7,381.80 5.958,191 32 1,481.752 07 066 10,52077 MWD+IFR-AK-CAZ-SC(3) 12,995.80 7198 224.41 5,804.09 5,733.65 -7,603.80 -7,444.94 5,958,128.63 1,481,687.65 044 10,610.36 MWD+IFR-AK-CAZ-SC(3) 13,090.91 71.99 224.79 5,833.50 5,763.0 -7,668.20 -7,508.45 5,958,065.53 1,481622.87 0.38 10,700.52 MWD+IFR-AK-CAZ-SC(3) 13,18441 71.93 224.60 5,86245 5,792.01 -7,73140 -7,570.98 5,958,003.61 1,481,55908 020 10,789.13 MWD+IFR-AK-CAZ-SC(3) 13,279.48 71.90 224.71 5,89197 5,821.53 -7,795.68 -7,634.50 5.957,940 61 1,481,494.29 0.11 10,879.20 MWD+IFR-AK-CAZ-SC(3) 13,37383 72.04 225.41 5,921.17 5,85073 -7,859.0 -7,698.00 5,957,878.54 1,481,429,53 072 10,968.57 MWD+IFR-AK-CAZ-SC(3) 13,46820 71.50 225.44 5,950,69 5,880.25 -7,921.97 -7.761.85 5,957,816.93 1,481,364.43 0.57 11,057.80 MWD+IFR-AK-CAZ-SC(3) 13,562.30 71.51 226.89 5,980.54 5,910.10 -7,983.77 4,826.22 5,957,75644 1,481,298.83 146 11,146.52 MWD+IFR-AK-CAZ-SC(3) 13,656.37 71.47 226.33 6,010.41 5,939.97 -8,045.05 -789104 5,957,696.48 1,481,232.79 0.57 11,235.13 MWD+IFR-AK-CAZ-SC(3) 13,750.15 71.45 227.14 6,04023 5,96979 -8,105.99 -7,955.79 5,957,636.86 1,481,166.84 0.82 11,323.43 MWD+IFR-AK-CAZ-SC(3) 13,800.59 71.44 226.74 6,05628 5,965.84 -8,138.63 -7,990.73 5,957,604.93 1,481.131.25 075 11,37090 MWD+IFR-AK-CAZ-SC 3 13,83800 71.58 227.62 6,068.14 5,99770 -8,162.75 -8,016.75 5,957,581.34 1,481,104.75 2.25 11406.10 IJOTanActuelSurvey 9 6/8" x 12-1/4" 13,873.32 7172 228.44 6,079.26 6,008.82 -8,185.17 -6,041.67 5,957,559.43 1,481,079.39 225 11,439.29 MWD+IFR-AK-CAZ-SC(4) 13,898.1] 71.59 228.79 6,087.06 6,01664 -8,200.76 -8,059.37 5.95754420 1,481,061.38 1.44 11,462.61 MWD+IFR-AK-CAZ-SC(4) 13,991.32 71.56 22641 6,116.53 6,046.09 -8,26035 -6,124.63 5,957.485.94 1480.994.94 242 11,550.20 MWD+IFR-AK-CAZ-SC(4) 14,085.38 72.04 222.75 6,145.92 607548 -8,323.98 -8,187.33 5,957,423.59 1,480,930.98 3.73 11,639.25 MWD+IFR-AK-CAZ-SC(4) 14.177.07 72.60 218.38 6,173.77 6,103.33 -8,390.33 -8.244.12 5,957,35840 1480,872.8] 4.58 11,726.58 MWD+IFR-AK-CAZ-SC 14) 14,271.68 73.52 214.04 6,201,35 6,13091 -8,463.34 -8,297.56 5,957,286.49 1,480,817.97 4.49 11816.86 MWD+IFR-AK-CAZ-SC(4) 14,365.78 74.04 2005. 6,227.65 6,15721 -8,540.30 -8,344.80 5.957,210.50 1,480,76920 5.12 11,906.18 MWD+IFR-AK-CAZ-SC(4) 14,460.74 75. D9 204.81 6,252.94 6,182.50 -8,621.91 -8,386.25 5,957,129.75 1,480,726.12 4.44 11,995.34 MWD+IFR-AK-CAZ-SC (4) 14,558.16 75.82 201.60 6,276.90 6,206.46 -8,706.79 -842263 5,957,045.63 1,480,688.04 3.34 12,08375 MWD+IFR-AK-CAZ-SC(4) 14,650.34 75.82 200.54 6,299.98 6,229.54 -8,791.99 -8,45546 5,956,961.11 1,480,65350 1.09 12,170.12 MWD+IFR-AK-CAZ-SC(4) 14,745.48 75.94 201.69 6,323.19 6,252.75 -8.878.06 -8488.69 5,956,875.73 1,480,618.54 1.18 12,257.42 MWD+IFR-AK-CAZ-SC(4) 14,840.21 7604 202.02 6,346.12 6,275.68 -8,0337 -8,522.91 5,956.791.14 1460,58262 0.35 12,34476 MWD+IFR-AK-CAZ-SC(4) 14,933.86 76.00 203.20 6,368.75 6,298.31 -9,047.26 -8,557.84 5,956,707.97 1,480,546.01 1.22 12,431.48 MWD+IFR-AK-CAZ-SC (4) 15,028.23 76.W 202.54 6,391.58 6,321.14 -9,131.63 -8,593.43 5,956,624.34 1,480,508.73 0.68 12,518.98 MWD+IFR-AK-CAZ-SC(4) 15.122.85 76.02 203.81 6,414.45 6,344.01 -9.216.03 -8,629.56 5,956,540.69 1,480,47091 1.30 12,60.86 MWD+IFR-AK-CAZ-SC(4) 15,216.07 76.00 20365 6.436.99 6,366.55 -9,298.84 -8,665.96 5,956,458.64 1,480,432.85 0.17 12,69370 MWD+IFR-AK-CAZ-SC(4) 15311.54 75.97 203.99 6,460.11 6.38967 -9.383.57 -8,703.37 5,956.374.68 1480,393.75 0.35 12,782.65 MWD+IFR-AK-CAZ-SC(4) 10/24/2017 2:27: 19PM Page 6 COMPASS 5000.14 Build 85 Company: ConomPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-316 Wellbore: CD5-316PB1 Design: CD5-316P81 Survey Conocoftillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5.316 actual (§ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 Map Map MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) 15405.90 75.97 204.07 648298 6,412.54 -9467.18 -8,740.65 5,956,291.84 1,480,354.80 15,499.46 75.78 204.71 6,505.82 6,435.38 -9,549.82 -8,778.12 5,956,209.98 1,480,315.68 15,593.24 75.78 204.38 6,52885 6,458.41 -9,632.51 -8,815.88 5,956,128.08 1,480,27626 15,687.69 75.78 203.76 6,552.05 6,481.61 -9,716.10 -8,853.22 5,956,045.26 1,480,237.25 15,781.97 75.81 203.31 6,575.19 6,50475 -9,799.90 -8,889.72 5,955,962.22 1,480,19907 15,876.86 75.81 202.90 6,598.45 6,528.01 -9,884.51 -8,925.82 5,955,878.35 1,480,161.28 15,972.96 75.78 202.74 6,622.03 6,551.59 -9,970.38 $,961.95 5,955,793.24 1,480,12343 16,065.85 75.81 202.15 6,644.83 6,574.39 -10,053.61 -8,996.33 5.955,71072 1,480,087.39 16.160.10 75.79 201.84 6,667.95 6,597.51 -10,138.33 -9,030.55 5,955,626.71 1,480,05147 16,253.94 75.78 201.55 6,690.99 6,620.55 -10,222.85 -9,064.18 5,955,542.89 1,480,016.15 16,348.37 75.85 201.68 6,714.13 6,843.69 -10.307.97 -9,097.90 5,955,458.48 1,479,980.72 16,443.15 7575 20167 6,737.38 6,666.94 -10,393.35 -9,131.84 5,955,373.80 1,479,945.08 16,534.91 75.94 201.97 6,759.82 6,689.38 -10,475.95 -9,169.91 5,955,291.89 1,479,91035 16,627.09 76.04 202.73 6,782.14 6,711.70 -10,558.67 -9,19892 5,955,209 88 1479,874.69 16,720.91 76.01 202.99 6,804.80 6,73436 -10,642.56 -9.234.29 5.955,126 72 1,479,83764 16.815.80 75.97 20348 6,827.77 6,757.33 -10,727.16 -9,270.61 5,955,042.88 1479,799.63 16,911.83 75.91 20384 6,851.10 6,780.66 -10,812.49 -9,307.99 5.954,958.33 1,479,760.54 17,004.42 75.95 204.42 6,873.61 6,803.17 -10,894.45 -9,34471 5,954,877.13 1479,722.18 17,098.39 75.95 204.47 6,896.42 6,825.98 -10,97744 -9,38243 5,954.794.92 1,479.682.80 17,19334 75.94 204.22 6,91948 6,849.04 -11,051.36 -9,42040 5,954,71179 1,479,643.15 17,286.86 7577 203.93 6,942.33 6,871.89 -11,144.15 -9,457.39 5,954,629.76 1,479,604.50 17,38209 75.88 203.04 6,96565 6,895.21 -11.228.83 -9,494.19 5,954,54585 1,479,566.01 17,476.04 75.76 202.61 6,968.67 6,918.23 -11,312.79 -9,529.52 5,954,462.63 1479,529.00 17.569,67 75.79 20164 7,011.68 6.94124 -11,39686 -9,563.70 5,954,379.26 1,479,493.13 17,664.13 75.83 20120 7,034.83 6,964.39 -11,482.11 -9,597.15 5.954,294.71 1479,457.98 17,758.47 75.78 201.38 7,057.97 6,987.53 -11567.33 -9,630.36 5,954,210.18 1,479,42307 17,85289 75.77 201.59 7,081.17 7,010.73 -11,652.50 -9,663.88 5,954,125.71 1,479,38]84 17,947.14 75.75 202.03 7,104.35 7,033.91 -11737.31 -9,697.82 5,954.041.61 1,479,352.20 1804176 75.72 201.77 7,12767 7057.23 -11,82240 -9,732.02 5,953,957.23 1,479,316.30 18,136.27 75.91 201.94 7,150.83 7,080.39 -11,907.44 -9,766.13 5,953,872.90 1479,28048 18,229.93 75.97 202.45 7,173.58 7,103.14 -11.991.56 -9.800.45 5,953,78949 1,479,244.48 18,324.36 75.98 20213 7,196.47 7,126.03 -12,076.17 -9,835.65 6.9M 705 62 1,479,20759 18,419.05 75.97 203.92 7,219.41 7,148.97 -1216050 -9.672.02 5.953,622 04 1.479 169.53 18,513.50 75.90 203.62 7,242.37 7,171.93 -12,244.35 -9,908.95 5,953,538.96 1,479,130.93 18,60746 75.95 20242 7,265.22 7,194.78 -12,328.23 -9,944.59 5,953,455.82 1,479,093.61 18,70186 76.69 199.84 7,287.57 7,217.13 -12,413.87 -9,977.68 5,953,370.87 1,479,058.80 18,796,52 76.73 19204 7,309.31 7,238.87 -12,501.16 -10,00679 5,953,284.19 1,479.027.95 18,890.61 76.70 197.21 7,330.94 7,260.50 -12,58867 -10,033.75 5,953,197.24 1,478,999.23 18,985.10 77.49 195.34 7,352,04 7,281.60 -12,677.08 -10,059.56 5,953,109.38 1478,971.65 19,078.16 7808 194.43 7,371.73 7,301.29 -12,764.96 -10,082.92 5,953,021.97 1,478,946.52 10242017 2:27:19PM Page 7 COMPASS 5000,14 Build 85 Vertical DLS Section (°/100') (ft) Survey Tool Name 0.08 12,870.67 MWD+IFR-AK-CAZ-SC(4) 0.69 12,958.05 MWD+IFR-AK-CAZ-SC(4) 0.34 13,045.67 MWD+IFR-AK-CAZ-SC(4) 0.64 13,133.71 MWD+IFR-AK-CAZ-SC(4) 0.46 13.221.36 MWD+IFR-AK-CAZ-SC (4) 0.42 13,309.38 MWD+IFR-AK-CAZ-SC (4) 0.16 13,398.39 MWD+IFR-AK-CAZ-SC (4) 0.62 13484.24 MWD+IFR-AK-CAZ-SC(4) 0.32 13.571.14 MWD+IFR-AK-CAZ-SC(4) 0.30 13,657.50 MWD+IFR-AK-CAZ-SC(4) 0.15 13,744.38 MWD+IFR-AK-CAZ-SC (4) 0.11 13,831.60 MWD+IFR-AK-CAZ-SC (4) 0.38 13,916.14 MWD+IFR-AK-CAZ-SC (4) 0.81 14,001.36 MWD+IFR-AK-CAZ-SC (4) 027 14,088.36 MWD+IFR-AK-CAZ-SC(4) 0.50 14,176.52 MWD+IFR-AK-CAZ-SC(4) 0.37 14,265.91 MWD+IFR-AK-CAZ-SC(4) 0.61 14,352.30 MWD+IFR-AK-CAZ-SC(4) 0.05 14,440.12 MWD+IFR-AK-CAZ-SC(4) 0.26 14,528.81 MWD+IFR-AK-CAZ-SC (4) 0.35 14,616.01 MWD+IFR-AK-CAZ-SC (4) 0.91 14,704.53 MWD+IFR-AK-CAZ-SC (4) 0.46 14,791.56 MWD+IFR-AK-CAZ-SC(4) 1.00 14,877.93 MWD+IFR-AK-CAZ-SO(4) 0.45 14,964]4 MWD+IFR-AK-CAZ-SC(4) 0.19 15,051.36 MWD+IFR-AK-CAZ-SC(4) 0.22 15,138.15 MWD+IFR-AK-CAZ-SC(4) 0.45 15,224.94 MWDHFR-AK-CAZ-SC (4) 0.27 15,312.11 MWD+IFR-AK-CAZ-SC (4) 0.27 15,399.18 MWD+IFR-AK-CAZ-SC (4) 0.53 15,485.68 MWD+IFR-AK-CAZ-SC (4) 0.29 15,573.12 MWD+IFR-AK-CAZ-SC(4) 1.22 15,661.10 MWD+IFR-AK-CAZ-SC(4) 0.32 15,749.07 MWD+IFR-AK-CAZ-SC(4) 1.24 15,836.23 MWDHFR-AK-CAZ-SC(4) 277 15,923.11 MWDH1FR-AK-CAZ-SC(4) 2.88 16,008.68 MWD+IFR-AK-CAZ-$C(4) 0.18 16,093.05 MWD+IFR-AK-CAZ-SC (4) 2.10 16,177.37 MWD+IFR-AK-CAZ-SC (4) 1.15 16,259.72 MWD+IFR-AK-CAZSC (4) 10242017 2:27:19PM Page 7 COMPASS 5000,14 Build 85 Company: ConomPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CDS Alpine West Pad Well: CDS-316 Wellbore: CD5-316PB1 Design: CD5-316PB1 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-316 CD5-316 actual Q 70,44usft (Doyon 19) CD5-316 actual Q 70.44usft (Doyon 19) True Minimum Curvature OAKEDMP2 rinal Definitive Survey Verified and Siqned-off All targets and/or well position objectives have been achieved. [I Yes [_ No ! have checked to the best of my ability that the tollowkV data Is correct: (] Surface Coordinates L] Declination & Convergence Suryeys from 13,873.32 to 19,505.68 z: R Map Map Vertical MD Inc Azi TVD TVDSS +N/S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (-1100-) (ft) Survey Tool Name 19,173.32 78.62 19321 7,390.95 7,320.51 -12,85548 -10,105.18 5,952,931.94 1,478.922.45 1.38 18,343.36 MWD+IFR-AK-CAZ-SC(4) 19,26982 79.19 192.31 7,409.52 7.339.08 -12,947.84 -10,126.10 5,952,840.03 1,478,899.68 t.09 16,427.55 MWD+IFR-AK-CAZ-SC(4) 19,364.13 79.96 190.33 7,426.58 7,356.14 -13,038.78 -10,144.30 5,952,74948 1,478,879.65 2.22 16,508.92 MWD+IFR-AK-CAZ-SC(4) 19,456.36 79.90 188.56 7,442.71 7,372.27 -13,128.36 -10,159.20 5952,660.23 1,478,862.95 1.89 16,587.11 MWD+IFR-AK-CAZSC(4) 19,505.68 79.89 187.12 7,451.36 7,380.92 -13,176.46 -10,165.82 5,952,612.28 1,478,855.36 2.87 16,628.22 MWD+IFR-AK-CAZSC(4) 19,537.00 79,89 187.12 7,456.86 7,386.42 -13207.05 -10,169.65 5.952,581.77 1,478.85092 0.00 16,654.11 PROJECTED to TD Ill open hole rinal Definitive Survey Verified and Siqned-off All targets and/or well position objectives have been achieved. [I Yes [_ No ! have checked to the best of my ability that the tollowkV data Is correct: (] Surface Coordinates L] Declination & Convergence Suryeys from 13,873.32 to 19,505.68 z: R GRS Survey Corrections BHI surveys Survey Tool Codes BrandOnTem 'e Digitally signed by Brandon Temple SIB DE: p Date: 2017.10.2511:00:15-08'00' Client Representative: Wei feng Dai Date: la'24/2017 2:27: 19PM Page 8 COMPASS 5000.14 Build 85 PTD From: Dai. Well To: Nioku Johnson; Earhart Will C; Alexa. Kurt J Subject: FW: [EXTERNAL]COP OD5-316 Top of Cement Analysis Date: Monday, September 18, 2017 5:07:00 PM Cement looks great. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Amanda Joyce Blades [mailto:ACollins8@slb.com] Sent: Monday, September 18, 2017 4:39 PM To: Dai, Weifeng <Weifeng.Dai @conocophill ips.com>; Erik Sterk <ESterk@slb.com> Cc: Douglas Hupp <DHupp@slb.com>; Stephen Lauper <SLauper@slb.com>; Jason Burt <1Burt2@slb.com> Subject: [EXTERNAL]COP CD5-316 Top of Cement Analysis Schlumberger -Private Weifeng, The top of cement on the CD5-316 is located at 18,120 ft MD, indicated by the drop in the casing amplitude at this location, from the previous consistently higher values. I have uploaded the data and logs to InterACT and included a log with this email. The logs and data are located in the following folder. log > Schlumberger Alaska DM > ConocoPhillios Alaska > CDS_ 21_6 > SIS Processed Results Please let me know if you have any questions. Regards, Amanda Amanda J. Blades Senior Well Placement Engineer Schlumberger Data Services 6411 A Street Anchorage, AK 99518 Office: 907-273-1747 Mobile: 907-268-9074 The information and/or data contained in this communication is confidential and intended solely for the individual or entity addressed herein. If you received this email in error, please delete and contact the sender. Schlumberger does not guarantee results of its services, realizing the same are opinions based on inferences from measurements and testing. Customer takes full responsibility for use of any r deliverables, data, interpretations, or recommendations provided by Schlumberger. No entity may publish or display information or data provided by Schlumberger to another party, nor may any entity use Schlumberger's name or trademark(s) without prior written authorization. CD5-316 Proposed Completion Schematic 20" H-40 Welded Conductor Upper Completion: Lencith 115' 1) 4-1/2" 12.6#/ft Hydril 563 2) 3.813" X Nipple 3) 4-'/z" x 1" Camco KBMG GLM (xx°) w/DCK2 7' pinned for 2500 psi casing to tbg shear 13-318" 68# L-80 BTC 4) Sliding Sleeve with X Profile 1.5' 2,360' MD / 2,176' TVD - 5) 3.813" XN Nipple 42" Inc/218" azi 3.813" X Nipple 6) WLEG with seals 1.5' 2,200' MD 13-318" casing TOC per returns @ Lower Completion: Sur face 7) ZXP Liner Top Packer & Flexlock Liner Hanger 37' XO 5" Hydril 521 Box X 4-'/z' IBTM pin 8) 4'/:", 12.6#/ft, L-80 TXP Liner Perf pups/slots and swell packers as necessary Gas Lift Mandrel with SOV 3.420MD 7" 26# L-80 Tle Back BTC -M with Torque Rings 9-5/8" casing TOC per volumetrics @ 7.912' MD/4,194 TVD 7" Liner Top @ 13.682' MD / 6.018' TVD 9-518" 40# L•80 BTC -M 13,839' MD / 6,068' TVD 72' Inc 1228° azi VA" 12.6# L-80 H563 Tubing 19 200' MD CMU Sliding Sleeve, 3.813" X 7" Liner TOC per Sonic LWD @ 18,120' MD / 7,327' TVD 14.650' 3.813" XN Nipple 14,700' MD 7" 26# L-80 H663 Liner 19,333' MD / 7,446' TVD 4-'h" Liner Top Packer 87' Inc/169" azi 19,183' MD / 7.438' TVD l%\4-%,"'2.6 ppf L-80 TXP liner with pert pups 19,183'-29,077'MD 6-118" Open Hole 29,087MD / 7,521'TVD ----------------------- O O 0 0 0 0 1 O o I Cement Detail Report CDS-316 String: Liner Cement Jab: DRILLING ORIGINAL, 7/24/201710:00 Cement Details Description Cementing Start Date Cementing End Data Wellbore Name Liner Cement 9/7/2017 1000 9/7/2017 1249 CD -316 Comment Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement.. Top Plug? Bbn Plug? Liner Cement Cmt Int.2 Liner 18,469.0 19,333.0 Yes Yes Yes O Pump [nit (bbl/m... IQ Pump Final (bbl/... IQ Pump Avg (bbl/... P Pump Final (psi) P Plug Bump(psi) Recip? Stroke (B) Rotated? Pipe RPM (rpm) 41 2 720 490.0 1,000.0 Yes 50.00 No I Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pumped 40 bbl of 12.5 ppg MPII spacer at 3.7 bpm. Launched bottom dart and chased with 60.1 bbl of 15.8 ppg call. Launched top dart wl 20 bbl of H2O from the cmt unit. Swapped over to rig pumps and displaced w/ 406 bbl of 11.1 ppg mud at 4 bpm. Bumped plug w/ 1000 psi. Increased to 2700 psi and S/O 70k to set Hanger Continued up to 3900 psi to set hanger packer. Bleed off and checked floats, "Floats Held". REleased from hanger and sheared subs at 80k. "CIP @ 12:45" 'TOL= 13,681" Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Elm (111103) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 18,469.0 19,333.0 290 G 60.1 Meld (R/sack) Mix H2O Ratio (gal/sa... Free Water (Y) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) Cmpr3tr 1 (psi) 1.16 5.07 15.80 13.00 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Conc Unit label Retarder D177 0.02 gal/sx Page 1/1 Report Printed: 920/2017 Schlumberger Cementing Jot, Report CemCAT"1.6 Well cos -316 Client Conoco Field Alpine SIR No. 2540971 Engineer Ted Simson lob Type T' intermediate finer Country United States Job Date 09-07-2017 Time _. Pressure Density Pump Rate Messages 08:09:04 Rk Rate Chec Reset p[al, Vol = 6.09 bbl Reset T 08:34:00 08:59:00 09:24:00 09:49:00 Break arculation Tripe work, reset H1 Pr 10:14:00 Good PT, Bleed off, Start batching spier Reset Total, Vol = 40.01 bbl End Spacer Bottom can dropped, wash up 10:39:00 Mud collected a 15.811 Mix water temp 81 deg Reset Total, Vol - 60.07 bbl END SLURRY Drop Top Dart 11:04:00 Klaz put dad Reset Total, Val = 19.98 bet End water, turn over to hg Reset Total, Vol = 0.00 bbl 11:29:00 Bottom dart latch w/1415 aft Top dart latch w/1994 strks 11:54:00 12:19:00 12:44:00 Top Aug lands w/ 4063 strks Pressure up 13:09:00 Releasted from tool. End job 13:27:30 hh:mm:ss w um asx amo s o u ma zz.e un s a.w za v s.o az ea s PSI LB/G BIM 09/07/2017 15:53:45 Schlumberger Cementing Service Report Well CD5-316 louNon(lyal) Customer ]eta Humber Can= 2540971 5d,umbWNw LecaNP lob Start Anr/ioruge SOD/07/2017 Flald Alpine fanastlw Name/Type DaViati. deg BR Sha 9.9 in Well ND 19342.0 R Wall TVD 7442.0 It CPidy SMa/Pravinw BNP 11 NHST 160 degF NMR 135 degF Iare Pros wadMn[ tb/gal Well NaalW apt/tical Nly N. Doyon 19 DrXIeO For Water Injector SeMw In. Und CtlnS/Crow aaPu, R Slit' In Walght lb/R aMa ihrPd olMhore Zone well 0. New WeN type Development 13838.0 9.6 40.0 L-80 API 19342.0 7.0 26.0 L-80 AN "Ung Fluid Type Nos Denali lb/gal Nastia Viecorip OF TubN situdI NP WD DepM,R Slim WNNbt, Sam 6Ne Tbrae6 S.M. une [¢framing lob Typo 7" intermediate liner D 13681.0 5.0 16.3 0.0 0,0 0.0 N.. Allowed Tub. Prase psi Naa. Anavmd Ann. Prep psiTagR WM Connwtlan PeefwaDNra/Open MOM Be,taw,R abet/R No.&SNeb Total Interval SaMha lasbpdow Cement 7" liner with 58.5 bbls MudPtISH spacer. 15.8 ppg QANNIK + 0.07 pils D177. 40 bbls 32.5ppg ft R ft it R mionetw It R in Trast Dewe Dnll Pipe Dlplecwnwrt ParAar Typo 438.0 bbl PadtM DepM R TVNbN Vol. 225.0 bbl "Well Vol. Annular Val. 213.0 bbl 744.0 bbl opwhata Vol. 265.0 bbl casing/Tobin Seauwd 1 Noll Val. nmulatN PHw to Cwewt R. Wog Toots Sq.11ab IIR Preawn psir1 ShP TV" Float S4 -TVP NP Rotated [-]NP Neciprawtad a Shea D.qh 19329.0 R Toal TVP No. centragian TWMP i Bottom Fluas 1 STEP Tae, Type Tool Dept, R Leman Nand TyP San" Taal Depth R Tall NP Sha in lob SchMaled Pw SgVO7/2017 ArHved on Location Sep/07/2017 Gasva laratian Sep/07/2017 Caller Ty Other Tan PIP Depth R CaBw Depth 19207.0 R ego. Total Vol. bN Data Moa 24hr eloak Weatin Neta praeasR a/N PSI StaP Volume BNL T" Volume BBL D.-Aw t!/d Nawga 09/07/2017 08:09:04 85 0.0 0.0 0.0 0.01 started AW Wtlw 09/07/2017 08:09:24 84 3.0 1.0 1.0 0.00 09/07/2017 08:09:44 83 3.0 2.0 2.0 0.00 09/07/2017 08:10:04 84 3.0 3.0 3.0 0.00 09/07/2017 08:10:24 40 0.0 3.1 3.1 0.00 09/07/2017 08:10:44 49 0.0 3.1 3.1 0.00 09/07/2017 08:11:04 84 0.0 3.1 3.1 0.01 09/07/2017 08:11:24 78 0.0 3.1 3.1 0.01 09/07/2017 08:11:43 81 0.0 3.1 3.1 0.01 H -Head Rate Check 09/07/2017 08:11:44 80 0.0 3.1 3.1 0.00 09/07/2017 08:12:04 77 3.0 3.5 3.5 0.01 09/07/2017 08:12:24 81 3.0 4.5 4.5 0.01 09/07/2017 08:12:44 79 3.0 5.5 5.5 0.01 09/07/2017 08:13:04 80 0.0 6.1 6.1 0.00 09/07/2017 08:13:07 76 0.0 6.1 6.1 0.01 Reset Total, Vol = 6.09 bbl 09/07/2017 08:13:24 79 0.0 0.0 0.0 0.01 09/07/2017 08:13:44 79 0.0 0.0 0.0 0.01 09/07/2017 08:14:04 76 0.0 0.0 0.0 0.00 09/07/2017 08:14:24 76 0.0 0.0 0.0 0.01 09/07/2017 08:14:44 80 0.0 0.0 0.0 0.00 09/07/2017 08:15:04 79 0.0 0.0 0.0 0.00 Page 1 aL 14 WWI COS -316 FhtlB Alpine Je Mft Sep/07/2017 CUWomer Conoco loh Numhm 2540971 Mb Time 2 hr irk T al" P e . PSI Sale s/M stye Vy . SSL TOW VOWme VSL p t, NOmye W/C 09/07/2017 08:15:44 77 0.0 0.0 0.0 0.00 09/07/2017 08:16:04 78 0.0 0.0 0.0 0.00 09/07/2017 08:16:24 36 0.0 0.0 0.0 0.00 09/07/2017 08:16:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:17:04 33 0.0 0.0 0.0 -0.00 09/07/2017 08:17:24 34 0.0 0.0 0.0 0.01 09/07/2017 08:17:44 31 0.0 0.0 0.0 0.00 09/07/2017 08:18:04 33 0.0 0.0 0.0 1 0.00 09/07/2017 08:18:24 32 0.0 0.0 0.0 0.00 09/07/2017 08:18:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:19:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:19:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:19:44 33 0.0 0.0 0.0 0.01 09/07/2017 08:20:04 33 - 0.0 0.0 0.0 0.00 09/07/2017 08:20:24 34 0.0 0.0 0.0 0.01 09/07/2017 08:20:44 35 0.0 0.0 0.0 0.00 09/07/2017 08:21:04 36 0.0 0.0 0.0 0.01 09/07/2017 08:21:24 29 0.0 0.0 0.0 0.00 09/07/2017 08:21:44 29 0.0 0.0 0.0 0.01 09/07/2017 08:22:04 30 0.0 0.0 0.0 0.00 09/07/2017 08:22:24 29 0.0 0.0 0.0 0.01 09/07/2017 08:22.N 29 0.0 0.0 0.0 0.00 09/07/2017 08:23:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:23:24 30 0.0 0.0 0.0 -0.00 09/07/2017 08:23:44 31 0.0 0.0 0.0 0.00 09/07/2017 08:24:04 29 0.0 0.0 0.0 0.00 09/07/2017 08:24:24 29 0.0 0.0 0.0 0.01 09/07/2017 08:24:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:25:04 29 0.0 0.0 0.0 0.01 09/07/2017 08:25:24 30 0.0 0.0 0.0 0.01 09/07/2017 08:25:44 29 0.0 0.0 0.0 41.00 09/07/2017 08:26:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:26:24 29 0.0 0.0 0.0 0.00 09/07/2017 06:26:44 29 0.0 0.0 0.0 0.00 09/07/2017 08:27:04 31 0.0 0.0 0.0 0.01 09/07/2017 08:27:24 31 0.0 0.0 0.0 0.01 09/07/2017 08:27:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:28:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:28:24 32 0.0 0.0 0.0 0.00 09/07/2017 08:28:44 31 0.0 0.0 0.0 0.00 09/07/2017 08:29:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:29:24 28 0.0 0.0 0.0 0.00 09/07/2017 08:29:44 30 0.0 0.0 0.0 0.01 09/07/2017 08:30:04 30 0.0 0.0 0.0 0.00 09/07/2017 08:30:24 32 0.0 0.0 0.0 0.01 09/07/2017 08:30:44 27 0.0 0.0 0.0 0.00 09/07/2017 08:31:04 30 0.0 0.0 0.0 0.00 09/07/2017 08:31:24 31 0.0 0.0 0.0 0.01 09/07/2017 08:31:44 31 0.0 0.0 0.0 0.01 09/07/2017 08:32:04 29 0.0 0.0 0.0 0.01 09/07/2017 08:32:24 32 0.0 0.0 0.0 0.00 09/07/2017 08:32:44 30 0.0 0.0 0.0 0.00 09/07/2017 08:33:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:33:24 29 0.0 0.0 0.0 0.01 Pye 20119 WWI I%id 1eBBbrt Ns er 1e4 Bem6er CD5-316 Alpine Sep/07/2017 Con= 2540971 Dab Tm. Trxtlnp W. Bbp TOW D.e.By NesuB. 146r Pnmun B/M Volume Vtlem. W/B tlM VW BR BBL 09/07/2017 08:34:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:34:24 28 0.0 0.0 0.0 0.00 09/07/2017 08:34:44 30 0.0 0.0 0.0 0.00 09/07/2017 08:35:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:35:24 30 0.0 0.0 0.0 0.00 09/07/2017 08:35:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:36:04 34 0.0 0.0 0.0 0.01 09/07/2017 08:36:24 33 0.0 0.0 0.0 0.00 09/07/2017 08:36'.44 35 0.0 0.0 0.0 0.00 09/07/2017 08:37:04 32 0.0 0.0 0.0 0.01 09/07/2017 08:37:24 34 0.0 0.0 0.0 0.01 09/07/2017 08:37:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:38:04 33 0.0 0.0 0.0 0.00 09/07/2017 08:38:24 35 0.0 0.0 0.0 0.01 09/07/2017 08:38:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:39:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:39:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:39:44 33 0.0 0.0 0.0 0.00 09/07/2017 08'.40:04 34 0.0 0.0 0.0 0.00 09/07/2017 08:40:24 31 0.0 0.0 0.0 0.01 09/07/2017 08:40:44 32 0.0 0.0 0.0 0.01 09/07/2017 08:41:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:41:24 31 0.0 0.0 0.0 0.00 09/07/2017 08:41:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:42:04 33 0.0 0.0 0.0 0.01 09/07/2017 08:42:24 32 0.0 0.0 0.0 0.00 09/07/2017 08:42:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:43:04 31 0.0 0.0 0.0 0.01 09/07/2017 08:43:24 33 0.0 0.0 0.0 0.00 09/07/2017 08:43:44 34 0.0 0.0 0.0 0.01 09/07/2017 08:44:04 33 0.0 0.0 0.0 0.01 09/07/2017 08:44:24 34 0.0 0.0 0.0 0.01 09/07/2017 08:44:44 32 0.0 0.0 0.0 0.01 09/07/2017 08:45:04 32 0.0 0.0 0.0 0.00 09/07/2017 08:45:24 33 0.0 0.0 0.0 0.00 09/07/2017 08:45:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:46:04 33 0.0 0.0 0.0 0.00 09/07/2017 08:46:24 33 0.0 0.0 0.0 0.00 09/07/2017 08:46:44 33 0.0 0.0 0.0 0.00 09/07/2017 06:47:04 34 0.0 0.0 0.0 0.01 09/07/2017 08:47:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:47:44 35 0.0 0.0 0.0 0.00 09/07/2017 08:48:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:48:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:48:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:49:04 34 0.0 0.0 0.0 0.00 09/07/2017 08:49:24 31 0.0 0.0 0.0 0.01 09/07/2017 08:49:44 32 0.0 0.0 0.0 0.01 09/07/2017 08:50:04 33 0.0 O.D 0.0 0.01 09/07/2017 08:50:24 31 0.0 0.0 0.0 0.01 09/07/2017 08:50:44 34 0.0 0.0 0.0 -0.00 09/07/2017 08:51:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:51:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:51:44 34 0.0 0.0 0.0 0.01 Py.Sd1B Well COS -316 Field Alpine left Bort Sep/07/2017 Cusf4mv Conoco lab BweBer 2540971 pato In. I r clad[ Tied" P.. IM bte B/M Age VAU. BBL T l Dansily Matsgga Volume W/o BBL 09/07/2017 08:52:24 33 0.0 0.0 0.0 0.01 09/07/2017 08:52:44 34 0.0 0.0 0.0 0.01 09/07/2017 08:53:04 33 0.0 0.0 0.0 0.01 09/07/2017 08:53:24 34 0.0 0.0 0.0 0.01 09/07/2017 08:53:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:54:04 34 0.0 0.0 0.0 -0.00 09/07/2017 08:54:24 35 0.0 0.0 0.0 0.01 09/07/2017 08:54:44 32 0.0 D.0 0.0 0.01 09/07/2017 08:55:04 29 0.0 0.0 0.0 0.01 09/07/2017 08:55:44 33 0.0 0.0 0.0 0.00 09/07/2017 08:56:04 30 0.0 0.0 0.0 0.01 09/07/2017 08:56:24 31 0.0 0.0 0.0 0.00 09/07/2017 08:56:44 31 0.0 0.0 0.0 0.00 09/07/2017 08:57:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:57:24 31 0.0 0.0 0.0 0.00 09/07/2017 08:57:44 32 0.0 0.0 0.0 0.00 09/07/2017 08:58:04 33 0.0 0.0 0.0 0.00 09/07/2017 08:58:24 33 0.0 0.0 0.0 0.01 09/07/2D17 08:58:44 31 0.0 0.0 0.0 0.00 09/07/2017 08:59:04 31 0.0 0.0 0.0 0.00 09/07/2017 08:59:24 31 0.0 0.0 0.0 0.00 09/07/2017 08:59:44 31 0.0 0.0 0.0 0.00 09/07/2017 09:00:04 30 0.0 0.0 0.0 0.00 09/07/2017 09:00:24 30 0.0 0.0 0.0 0.00 09/07/2017 09:00:44 30 0.0 0.0 0.0 •0.00 09/07/2017 09:01:04 30 0.0 0.0 0.0 0.00 09/07/2017 09:01:24 32 0.0 0.0 0.0 0.01 09/07/2017 09:01:44 31 0.0 0.0 0.0 0.00 09/07/2017 09:02:04 27 0.0 0.0 0.0 0.00 09/07/2017 09:02:24 28 0.0 0.0 0.0 0.00 09/07/2017 09:02:44 31 0.0 0.0 0.0 0.01 09/07/2017 09:03:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:03:24 31 0.0 0.0 0.0 0.00 09/07/2017 09:03:44 29 0.0 0.0 0.0 0.00 09/07/2017 09:04:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:04:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:04:44 31 0.0 0.0 0.0 0.01 09/07/2017 09:05:04 34 0.0 0.0 0.0 0.00 09/07/2017 09:05:24 32 0.0 0.0 0.0 0.01 09/07/2017 09:05:44 28 0.0 0.0 0.0 0.00 09/07/2017 09:06:04 33 0.0 0.0 0.0 0.00 09/07/2017 09:06:24 34 0.0 0.0 0.0 0.00 09/07/2017 09:06:44 33 0.0 0.0 0.0 0.00 09/07/2017 09:07:04 31 0.0 0.0 0.0 0.00 09/07/2017 09:07:24 34 0.0 0.0 0.0 0.00 09/07/2017 09:07:44 32 0.0 0.0 0.0 0.01 09/07/2017 09:08:04 29 0.0 0.0 0.0 0.01 09/07/2017 09:08:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:08:44 33 0.0 0.0 0.0 0.00 09/07/2017 09:09:04 32 0.0 0.0 0.0 0.00 09/07/2017 09:09:24 30 0.0 0.0 0.0 0.00 09/07/2017 09:09:44 30 0.0 0.0 0.0 0.00 09/07/2017 09:10:04 29 0.0 0.0 0.0 0.01 09/07/2017 09:10:24 29 0.0 0.0 0.0 0.00 ft"4a19 wa C05-316 flN4 Milne S SUS Sep/07/2017 Cmtomer Conoco Sob ■mebw 2540971 PON lone ]4 -hr Tftlllug P�esrn geb g/M gbge vwum am Teb1 Vo®uee am Oenu6Y Meugge 18/6 09/07/2017 09:11:04 30 0.0 0.0 0.0 0.00 09/07/2017 09:11:24 29 0.0 0.0 0.0 0.01 09/07/2017 09:11:44 28 0.0 0.0 0.0 0.00 09/07/2017 09:12:04 28 0.0 0.0 0.0 0.00 09/07/2017 09:12:24 30 0.0 0.0 0.0 0.01 09/07/2017 09:12:44 29 0.0 0.0 0.0 0.00 09/07/2017 09:13:04 28 0.0 0.0 0.0 0.01 09/07/2017 09:13:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:13:44 28 0.0 0.0 0.0 0.00 09/07/2017 09:14:04 30 0.0 0.0 0.0 0.01 09/07/2017 09:14:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:14:44 29 0.0 0.0 0.0 0.00 09/07/2017 09:15:04 29 0.0 0.0 0.0 0.00 09/07/2017 09:15:24 30 0.0 - 0.0 0.0 0.00 09/07/2017 09:15:44 29 0.0 0.0 0.0 0.00 09/07/2017 09:16:04 27 0.0 0.0 0.0 0.01 09/07/2017 09:16:24 30 0.0 0.0 0.0 0.00 09/07/2017 09:16:44 30 0.0 0.0 0.0 0.01 09/07/2017 09:17:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:17:24 29 0.0 0.0 0.0 0.00 09/07/2017 09:17:44 30 0.0 0.0 0.0 0.00 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09:18:04 09:18:24 09:18:44 09:19:04 09:19:24 09:19:44 09:20:04 30 28 28 29 31 28 29 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 . 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.01 0.01 0.00 -0.00 0.01 0.00 09/07/2017 09:20:24 31 1 0.0 0.0 0.0 0.00 09/07/2017 09:20:4 29 0.0 0.0 0.0 0.01 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09:21:04 09:21:24 09:21:44 09:22:04 09:22:24 29 29 30 30 29 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.01 0.01 09/07/2017 09:22:44 31 0.0 0.0 0.0 0.00 09/07/2017 09:23:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:23:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:23:44 32 0.0 0.0 0.0 0.00 09/07/2017 09:24:04 33 0.0 0.0 0.0 0.01 09/07/2017 09:24:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:24:44 31 0.0 0.0 0.0 0.00 09/07/2017 09:25:04 29 0.0 0.0 0.0 0.01 09/07/2017 09:25:24 29 0.0 0.0 0.0 0.00 09/07/2017 09:25:44 32 0.0 0.0 0.0 0.00 09/07/2017 09:26:04 30 0.0 0.0 0.0 0.01 09/07/2017 09:26:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:26:44 30 0.0 0.0 0.0 0.00 09/07/2017 09:27:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:27:24 31 0.0 0.0 0.0 0.00 09/07/2017 09:27:44 31 0.0 0.0 0.0 0.00 09/07/2017 09:28:04 30 0.0 0.0 0.0 0.01 09/07/2017 09:28:24 31 0.0 0.0 0.0 0.00 09/07/2017 09:28:44 32 0.0 0.0 0.0 0.00 Page 5 a19 WWI CDS 316 Ptah Alpine lob SULf Sep/07/2017 Customer Con. ]ab Number 2540971 Raft lime 24hr tlbCi Tr v Stiasuea os[ Mo S/M SI45e Volume Sel Tool D Wft New90 Voboeo LE/6 Sx 09/07/2017 09:29:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:29:44 30 0.0 0.0 0.0 0.01 09/07/2017 09:30:04 30 0.0 0.0 0.0 0.01 09/07/2017 09:30:24 32 0.0 0.0 0.0 0.01 09/07/2017 09:30:44 32 0.0 0.0 0.0 0.00 09/07/2017 09:31:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:31:24 30 0.0 0.0 0.0 0.01 09/07/2017 09:31:44 29 0.0 0.0 0.0 0.01 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09:32:04 09:32:24 09:32:44 09:33:04 29 29 28 31 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.01 09/07/2017 09:33:24 33 0.0 0.0 0.0 0.01 09/07/2017 09:33:44 32 0.0 0.0 0.0 0.00 09/07/2017 09:34:04 35 0.0 0.0 0.0 0.01 09/07/2017 09:34:24 32 0.0 0.0 0.0 0.01 09/07/2017 09:34:44 31 0.0 0.0 0.0 0.01 09/07/2017 09:35:04 32 0.0 0.0 0.0 0.01 09/07/2017 09:35:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:35:44 34 0.0 0.0 0.0 - 0.00 09/07/2017 09:36:04 31 0.0 0.0 0.0 0.00 09/07/2017 09:36:24 33 0.0 0.0 0.0 0.00 09/07/2017 09:36:44 33 0.0 0.0 0.0 0.01 09/07/2017 09:37:04 35 0.0 0.0 0.0 0.00 09/07/2017 09:37:24 32 0.0 0.0 1 0.0 0.01 09/07/2017 09:37:44 35 0.0 0.0 0.0 0.00 09/07/2017 09:38:04 32 0.0 0.0 0.0 0.01 09/07/2017 09:38:24 33 0.0 0.0 0.0 0.00 09/07/2017 09:38:44 35 0.0 0.0 0.0 0.01 09/07/2017 09:39:04 33 0.0 0.0 0.0 0.01 09/07/2017 09:39:24 33 0.0 0.0 0.0 0.01 09/07/2017 09:39:44 30 0.0 0.0 0.0 0.00 09/07/2017 09:40:04 35 0.0 0.0 0.0 0.01 09/07/2017 09:40:26 32 0.0 0.0 0.0 0.00 09/07/2017 09:40:44 35 0.0 0.0 0.0 0.00 09/07/2017 09:41:04 34 0.0 0.0 0.0 0.00 09/07/2017 09:41:24 34 0.0 0.0 0.0 0.00 09/07/2017 09:41:44 34 0.0 0.0 0.0 0.01 09/07/2017 09:42:04 34 0.0 0.0 0.0 0.00 09/07/2017 09:42:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:42:44 35 0.0 0.0 0.0 0.01 09/07/2017 09:43:04 32 0.0 0.0 0.0 0.00 09/07/2017 09:43:24 33 0.0 0.0 0.0 0.01 09/07/2017 09:43:44 35 0.0 0.0 0.0 0.01 09/07/2017 09:44:" 32 0.0 0.0 0.0 0.01 09/07/2017 09:44:24 32 0.0 0.0 0.0 0.01 09/07/2017 09:":44 33 0.0 0.0 0.0 0.01 09/07/2017 09:45:04 33 0.0 0.0 0.0 0.00 09/07/2017 09:45:24 32 0.0 0.0 0.0 0.00 09/07/2017 09:45:44 33 0.0 0.0 0.0 0.01 09/07/2017 09:46:04 37 0.0 0.0 0.0 0.00 09/07/2017 09:46:24 33 0.0 0.0 0.0 0.00 09/07/2017 09:46:44 34 0.0 0.0 0.0 0.00 09/07/2017 09:47:04 33 0.0 0.0 0.0 0.00 eiie S o 35. MINI CD5-316 Fl d Alpine 1P66OR Sep/07/2017 NNamr Conoco lob MomPar 2540971 YPCP TlPM ] r dock TrotinR P.. PRI RNP a/M mm v4WNo SOL TNN Vq mno SOL oanWW M." Ls/e 09/07/2017 09:47:44 34 0.0 0.0 0.0 0.00 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09:48:04 09:48:24 09:48:44 09:49:04 33 34 31 33 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.01 09/07/2017 09:49:24 34 0.0 0.0 0.0 0.00 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09:49:44 09:50:04 09:50:24 09:50:44 33 34 34 35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 0.00 0.01 0.01 1 0.00 09/07/2017 09:51:04 32 0.0 0.0 0.0 0.00 09/07/2017 09:51:24 35 0.0 0.0 0.0 0.01 09/07/2017 09:51:44 35 0.0 0.0 0.0 0.00 09/07/2017 09:52:04 35 0.0 0.0 0.0 0.00 09/07/201] 09:52:24 32 0.0 0.0 0.0 0.00 09/07/2017 09:52:44 35 0.0 0.0 0.0 0.00 09/07/2017 09:53:04 33 0.0 0.0 0.0 0.00 09/07/2017 09:53:24 32 0.0 0.0 0.0 0.00 09/07/2017 09:53:44 33 0.0 0.0 - 0.0 0.00 09/07/2017 09:54:04 33 0.0 0.0 0.0 0.00 09/07/2017 09:54:24 34 0.0 0.0 0.0 0.00 09/07/2017 09:54:44 34 0.0 0.0 0.0 0.00 09/07/2017 09:55:04 33 0.0 0.0 0.0 0.00 09/07/2017 09:55:24 31 0.0 0.0 0.0 0.01 09/07/2017 09:55:44 35 0.0 0.0 0.0 0.01 09/07/2017 09:56:04 31 0.0 0.0 0.0 0.01 09/07/2017 09:56:24 36 0.0 0.0 0.0 0.00 09/07/2017 09:56:44 34 0.0 0.0 0.0 0.01 09/07/2017 09:57:04 32 0.0 0.0 0.0 0.01 09/07/2017 09:57:24 33 0.0 0.0 0.0 0.00 09/07/2017 09:57:44 33 0.0 0.0 0.0 0.01 09/07/2017 09:58:04 35 0.0 0.0 0.0 0.01 09/07/2017 09:58:24 113 0.0 0.0 0.0 0.01 09/07/2017 09:58:44 111 0.0 0.0 0.0 0.01 ' 09/07/2017 09:59:04 108 0.0 0.0 0.0 0.01 09/0]/201] 09:59:24 110 0.0 0.0 0.0 0.00 09/0]/201] 09:59:44 111 0.0 0.0 0.0 0.00 09/0]/2017 10:00:04 107 0.0 0.0 0.0 0.01 09/0]/201] 10:00:24 106 0.0 0.0 0.0 0.01 09/07/2017 10:00:4 107 0.0 0.0 0.0 0.00 09/07/2017 10:01:04 108 0.0 0.0 0.0 0.01 09/07/2017 10:01:24 107 0.0 0.0 0.0 0.00 09/0]/201] 10:01:44 106 0.0 0.0 0.0 0.00 09/0]/201] 10:02:04 108 0.0 0.0 0.0 0.00 09/0]/201] 10:02:24 J 106 0.0 0.0 0.0 0.00 09/0]/201] 10:02:44 106 0.0 0.0 0.0 0.00 09/07/2017 10:03:04 106 0.0 0.0 0.0 0.00 09/07/2017 10:03:24 108 0.0 0.0 0.0 0.00 09/07/2017 10:03:44 45 0.0 0.0 0.0 0.01 09/07/2017 10:03:55 152 0.0 0.0 0.0 2.25 Break J Whom 09/07/2017 10:04:04 454 0.0 0.0 0.0 2.23 09/07/2017 10:04:24 498 2.2 0.4 0.4 2.27 09/07/2017 10:04:44 197 0.0 0.5 0.5 0.00 09/0]/201] 10:05:04 176 0.0 0.5 0.5 0.00 PPPP T N 1P VMI CDS-316 R d Alpine )ab SbK Sep/07/2D17 ase4mer Conom Jab Number 2540971 Dsb TIeN ]4M clad[ Tr-wev heaeuro m Nrte !JN sbge Volume ML Tool tNed1T VW me W9 BBL lml e 09/07/2017 10:05:44 162 0.0 0.5 0.5 0.00 09/07/2017 10:06:04 162 0.0 0.5 0.5 0.01 09/07/2017 10:06:24 1697 0.1 0.5 0.5 0.00 09/07/2017 10:06:40 1874 0.0 0.5 0.5 0.01 Tdps work, reset 09/07/2017 10:06:44 1867 0.0 0.5 0.5 -0.00 09/07/2017 10:07:04 3851 0.0 0.5 0.5 0.00 09/07/2017 10:07:24 4229 0.0 0.6 0.6 0.00 09/07/2017 10:07:25 4227 0.0 0.6 0.6 0.00 HI Pr 09/07/2017 09/07/2017 10:07:44 10:08:04 4219 4214 0.0 0.0 0.6 0.6 0.6 0.6 0.00 0.01 09/07/2017 10:08:24 4212 0.0 0.6 0.6 0.00 09/07/2017 10:08:44 41 0.0 0.6 0.6 0.00 09/07/2017 10:08:49 53 0.0 0.6 0.6 0.01 Good Pr, Bleed n11. 09/07/2017 10:09:04 52 0.0 0.6 0.6 0.00 09/07/2017 10:09:24 50 0.0 0.6 0.6 0.00 09/07/2017 10:09:44 54 0.0 0.6 0.6 0.00 09/07/2017 10:10:04 50 0.0 0.6 0.6 0.00 09/07/2017 10:10:24 51 0.0 0.6 0.6 0.01 09/07/2017 10:10:44 49 0.0 0.6 0.6 0.00 09/07/2017 10:11:04 84 0.0 0.6 0.6 2.11 09/07/2017 10:11:24 103 0.0 0.6 0.6 3.83 09/07/2017 10:11:41 112 0.0 0.6 0.6 8.31 Start batching spacer 09/07/2017 10:11:44 112 0.0 0.6 0.6 8.35 09/07/2017 10:12:04 129 0.0 0.6 0.6 9.86 09/07/2017 10:12:24 142 0.0 0.6 0.6 11.22 09/07/2017 10:12:44 150 0.0 0.6 0.6 12.40 09/07/2017 10:13:04 149 0.0 0.6 0.6 12.45 09/07/2017 10:13:24 147 0.0 0.6 0.6 12.44 09/07/2017 10:13:44 145 0.0 0.6 0.6 12.M 09/07/201] 10:14:04 146 0.0 0.6 0.6 12.43 09/07/201] 10:14:24 145 0.0 0.6 0.6 12.42 09/07/2017 10:14:44 147 0.0 0.6 0.6 12.54 09/07/2017 10:15:04 141 0.0 0.6 0.6 12.51 09/07/2017 10:15:24 140 0.0 0.6 0.6 12.51 09/07/2017 10:15:44 416 1.5 0.7 0.7 12.51 09/07/2017 10:16:04 633 2.5 1.4 1.4 12.54 09/07/2017 10:16:24 641 2.8 2.3 2.3 12.68 09/07/2017 10:16:44 730 2.8 3.2 3.2 12.95 09/07/2017 10:17:04 798 3.4 4.2 4.2 12.80 09/07/2017 10:17:24 772 3.4 5.3 5.3 12.69 09/0]/201] 10:37:44 861 4.0 6.5 6.5 12.65 09/07/2017 10:18:04 780 3.7 7.8 7.8 12.67 09/07/2017 10:18:24 758 3.8 9.1 9.1 12.67 09/07/2017 10:18:44 746 3.7 10.3 10.3 12.66 09/07/2017 10:19:04 693 3.7 U.S 11.5 12.64 09/07/2017 10:19:24 721 3.7 12.7 12.7 12.62 09/07/2017 10:19:44 728 3.7 14.0 14.0 12.50 09/07/2017 10:20:04 742 3.7 15.2 15.2 12.30 09/07/2017 10:20:24 746 3.7 16.4 16.4 12.65 09/07/201] 10:20:44 745 3.7 17.6 17.6 12.63 09/07/2017 10:21:04 719 3.7 18.8 18.8 12.65 09/07/2017 10:21:24 725 3.7 20.0 20.0 12.94 09/07/2017 10:21:44 659 3.7 21.3 21.3 12.36 09/07/2017 10:22:04 643 3.6 22.5 22.5 11.86 W.II CDS-316 1nel4 Alpine aesan Sep/07/2017 c.rtenw Con= ]o6 s.mbm 2540971 pea W. 2 h, aqa. T.Mk4m 9nNln m p.a 9/M stw Volume 991 T. MmsV Vdiu . WIG 991 Nq . 09/07/2017 10:22:44 659 3.7 24.9 24.9 12.16 09/07/2017 10:23:04 689 3.7 26.1 26.1 12.33 09/07/2017 10:23:24 676 3.7 27.3 27.3 12.31 09/07/2017 10:23:44 647 3.7 28.6 28.6 12.62 09/07/2017 10:24:04 683 3.7 29.8 29.8 12.67 09/07/2017 10:24:24 665 3.7 31.0 31.0 12.64 09/07/2017 10:24:44 620 3.7 32.2 32.2 12.61 09/07/2017 10:25:04 632 3.7 33.4 33.4 12.58 09/07/2017 10:25:24 631 3.7 34.6 34.6 12.56 .09/07/2017 10:25:44 630 3.7 35.9 35.9 12.56 09/07/2017 10:26:04 623 3.7 37.1 37.1 12.55 09/07/2017 10:26:24 615 3.7 38.3 38.3 12.88 09/07/2017 10:26:44 609 3.7 39.5 39.5 12.90 09/07/2017 10:27:04 129 0.0 40.0 40.0 12.83 09/07/2017 10:27:09 106 0.0 40.0 40.0 12.83 Reset Total, Vol : 40.01 bbl 09/07/2017 10:27:24 91 0.0 0.0 40.0 12.83 09/07/2017 10:27:27 88 0.0 0.0 40.0 12.83 End Space 09/07/2017 10:27:44 84 0.0 0.0 40.0 12.83 09/07/2017 10:28:04 82 0.0 0.0 40.0 12.82 09/07/2017 10:28:24 85 0.0 0.0 40.0 12.82 09/07/2017 10:28:44 112 0.0 0.0 40.0 9.87 09/07/2017 10:29:04 120 0.0 0.0 40.0 9.25 09/07/2017 10:29:24 129 0.0 0.0 40.0 10.42 09/07/2017 10:29:44 133 0.0 0.0 40.0 11.39 09/07/2017 10:29:54 136 0.0 0.0 40.0 11.34 Bolton Oat dropped, wash up 09/07/2017 10:30:04 98 0.0 0.0 40.0 11.30 09/07/2017 10:30:24 98 0.0 0.0 40.0 11.29 09/07/2017 10:30:44 97 0.0 0.0 40.0 11.27 09/07/2017 10:31:04 96 0.0 0.0 40.0 11.26 09/07/2017 10:31:24 110 0.0 0.0 40.0 8.78 09/07/2017 10:31:44 117 0.0 0.0 40.0 8.73 09/07/2017 10:32:04 92 0.0 0.0 40.0 8.64 09/07/2017 10:32:24 92 0.0 0.0 40.0 8.62 09/07/2017 10:32:44 88 0.0 0.0 40.0 8.52 09/07/2017 10:33:04 110 0.0 0.0 40.0 8.42 09/07/2017 10:33:24 102 0.0 0.0 40.0 8.42 09/07/2017 10:33:44 109 0.0 0.0 40.0 8.94 09/07/2017 10:34:04 128 0.0 0.0 40.0 11.32 09/07/2017 10:34:24 139 0.0 0.0 40.0 13.15 09/07/2017 10:34:44 168 0.0 0.0 40.0 15.26 09/07/2017 10:35:04 172 0.0 0.0 40.0 16.08 09/07/2017 10:35:24 173 0.0 0.0 40.0 16.04 09/07/2017 10:35:44 175 0.0 0.0 40.0 16.05 09/07/2017 10:36:04 178 0.0 0.0 40.0 16.05 09/07/2017 10:36:24 175 0.0 - 0.0 40.0 16.05 09/07/2017 10:36:44 179 0.0 0.0 40.0 16.05 09/07/2017 10:37:04 229 2.4 0.2 40.2 16.05 09/07/2017 10:37:24 788 3.1 1.1 41.1 16.12 09/07/2017 10:37:44 782 3.1 2.1 42.1 16.24 09/07/2017 10:38:04 822 3.4 3.2 43.2 15.89 09/07/2017 10:38:24 794 3.4 4.3 44.3 15.78 09/07/2017 10:38:44 767 3.4 5.5 45.5 16.14 09/07/2017 10:39:04 811 3.4 6.6 46.6 16.12 09/07/2017 10:39:24 891 3.8 7.9 47.9 16.11 P.9. 9a 29 NOB PMb lob eMw Natmner lob Nombs COS-316 Alpine Sep/07/2017 Conon 2540971 DOM 11eM T.." NPM AP TMl D--WW M4 N-hr P.. S/M Volume VP . U/6 slmt PSI BK BDL 09/07/2017 10:40:04 829 3.8 10.4 50.5 15.97 09/07/2017 10:40:24 847 3.8 11.7 51.7 15.82 09/07/2017 10:40:44 814 3.8 13.0 53.0 15.76 09/07/2017 10:41:04 836 3.8 14.3 54.3 15.75 09/07/2017 10:41:24 775 3.8 15.5 55.5 15.74 09/07/2017 10:41:44 761 3.8 16.8 56.8 15.74 09/07/2017 10:42:04 766 3.8 18.1 58.1 15.81 09/07/2017 10:42:24 722 3.8 19.4 59.4 15.89 09/07/2017 10:42:44 661 3.8 20.6 60.6 15.75 09/07/2017 10:43:04 639 3.8 21.9 61.9 15.76 09/07/2017 10:43:24 894 3.8 23.1 63.1 15.79 09/07/2017 10:43:44 621 3.8 24.4 64.4 15.81 09/07/2017 10:44:04 661 3.8 25.6 65.6 15.83 09/07/2017 10:44:24 643 3.8 26.9 66.9 15.83 09/07/2017 10:44:44 589 3.7 28.1 68.1 15.82 09/0]/201] 10:45:04 547 3.6 29.3 69.3 15.82 09/07/2017 10:45:24 566 3.7 30.5 70.5 15.82 09/07/2017 10:45:44 590 3.6 31.7 71.7 15.80 09/07/2017 10:46:03 570 3.6 32.9 72.9 15.78 MUd ballanred 0 ISAH 09/07/2017 10:46:04 582 3.6 32.9 72.9 1578 09/07/2017 10:46:21 550 3.5 34.0 74.0 15.78 Mix water temp 81 deg 09/07/2017 10:46:24 554 3.5 34.1 74.1 15.79 09/07/2017 10:46:44 554 3.5 35.3 75.3 15.85 09/07/2017 10:47:04 554 3.5 36.5 76.5 15.59 09/07/2017 10:47:24 553 3S 37.7 777 16.08 09/07/2017 10:47:44 576 3.5 38.9 78.9 16.16 09/07/2017 10:48:04 568 3.5 40.1 80.1 16.18 09/07/2017 10:48:24 598 3.5 41.2 81.3 16.21 09/07/2017 10:48:44 591 3.5 42.4 82.4 16.20 09/07/2017 10:49:04 604 3.5 43.6 83.6 16.29 09/07/2017 10:49:24 587 3.5 44.8 84.8 15.95 09/07/2017 10:49:44 539 3.5 46.0 86.0 15.53 09/07/2017 10:50:04 563 3.7 47.2 87.2 15.81 09/07/2017 10:50:24 615 _ 3.8 48.4 88.4 1594 09/07/2017 10:50:44 636 3.8 49.7 89.7 15.85 09/07/2017 10:51:04 649 I 3.8 51:0 91.0 15.99 09/07/2017 10:51:24 _ 644 - 3.8 52.2 92.2 16.03 09/07/2017 10:51:44 616 3.8 53.5 93.5 16.08 09/07/201] 10:52:04 635 3.8 54.8 94.8 16.17 09/07/2017 10:52:24 648 3.8 S6.0 961 16.01 09/07/2017 10:52:44 652 3.8 57.3 97.3 16.48 09/07/2017 10:53:04 695 3.8 58.6 98.6 16.74 09/0]/201] 10:53:24 705 3.8 59.9 99.9 16.65 09/07/2017 10:53:39 65 0.0 60.1 100.1 16.63 lk a TD 1, Vol = 60.07 bbl 09/07/2017 10:53:44 65 0.0 0.0 100.1 16.62 09/07/2017 10:53:51 66 0.0 0.0 100.1 16.62 ENO SLURRY 09/07/2017 10:54:02 64 0.0 0.0 100.1 16.60 Orap Top Dart 09/07/2017 10:54:04 63 0.0 0.0 100.1 16.59 09/07/2017 10:54:24 62 0.0 0.0 100.1 16.59 09/07/2017 10:54:44 65 0.0 0.0 100.1 16.65 09/07/2017 10:55:04 269 1.7 0.1 100.2 11.23 09/07/2017 10:55:24 296 2.8 0.8 100.9 11.24 09/07/2017 10:55:40 288 3.2 1.6 101.7 10.91 Kick out dart 09/07/2017 10:55:44 287 3.3 1.9 101.9 10.83 POBo to W 19 r WWI COS -316 Held Alpine 3el Stert Sep/07/2017 CNtem.r Conoco lel RumiNe 2540971 Mete In. 1 hr dock Treating Preteen MSI Mete DIN Stege Vdume SBL Tebl VdNtN NL Density LB/B Neenge 09/07/2017 10:56:24 255 3.3 4.0 104.1 9.71 09/07/2017 10:56:44 244 3.3 5.1 105.2 9.58 09/07/2017 10:57:04 240 3.3 6.2 106.3 9.55 09/07/2017 10:57:24 243 3.3 7.3 107.4 9.57 09/07/2017 10:57:44 250 3.3 8.4 108.5 9.47 09/07/2017 105804 217 3.3 9.5 109.6 9.37 09/07/2017 10:58:24 209 3.3 10.6 110.7 9.24 09/07/2017 10:58:44 214 3.3 11.7 111.8 S.BS 09/07/2017 10:59:04 212 3.3 12.8 112.9 8.64 09/07/2017 10:59:24 211 3.3 13.9 114.0 8.51 09/07/2017 10:59:44 202 3.3 15.0 115.1 8.41 09/07/2017 11:00:04 219 3.3 16.1 116.1 8.41 09/07/2017 11:00:24 221 3.3 17.2 117.2 8.34 09/07/2017 11:00:44 222 3.3 18.3 118.3 8.33 09/07/2017 11:01:04 227 3.3 19.3 119.4 8.33 09/07/2017 11:01:24 48 0.0 20.0 120.1 8.32 Reset Total, Vol = 19.98 bbl 09/07/2017 11:01:38 50 0.0 0.0 120.1 8.32 End water, Wm over W rig 09/07/2017 11:01:43 49 0.0 0.0 120.1 8.32 Reset Tdal, Vol = 0.00 bbl 09/07/2017 11:01:44 50 0.0 0.0 0.0 8.32 09/07/2017 11:02:04 37 0.0 0.0 0.0 8.30 09/07/2017 11:02:24 35 0.0 0.0 0.0 8.29 09/07/2017 11:02:44 38 0.0 0.0 0.0 8.27 09/07/2017 11:03:04 39 0.0 0.0 0.0 8.26 09/07/2017 11:03:24 37 0.0 0.0 0.0 8.25 09/07/2017 11:03:44 38 0.0 0.0 0.0 8.24 09/07/2017 11:04:04 40 0.0 0.0 0.0 8.23 09/07/2017 11:04:24 36 0.0 0.0 0.0 8.22 09/07/2017 11:04:44 40 0.0 0.0 0.0 8.21 09/07/2017 11:05:04 38 0.0 0.0 0.0 8.20 09/07/2017 11:05:24 39 0.0 0.0 0.0 8.18 09/07/2017 11:05:44 43 0.0 0.0 0.0 8.18 09/07/2017 11:06:04 47 0.0 0.0 0.0 8.25 09/07/2017 11:06:24 39 0.0 0.0 0.0 8.24 09/07/2017 11:06:44 37 0.0 0.0 0.0 8.24 09/07/2017 11:07:04 35 0.0 0.0 0.0 8.30 09/07/2017 11:07:24 37 0.0 0.0 0.0 8.31 09/07/2017 11:07:44 37 0.0 0.0 0.0 8.31 09/07/2017 11:08:04 33 0.0 0.0 0.0 8.31 09/07/2017 11:08:24 30 0.0 0.0 0.0 8.60 09/07/2017 11:08:44 141 0.0 D.0 0.0 B.47 09/07/2017 11:09:04 70 0.0 0.0 0.0 8.35 09/07/2017 11:09:24 45 0.0 0.0 0.0 7.60 09/07/2017 11:09:44 37 0.0 0.0 0.0 7.19 09/07/2017 11:10:04 32 0.0 0.0 0.0 6.96 09/07/2017 11:10:24 30 0.0 0.0 0.0 6.89 09/07/2D17 11:10:44 27 0.0 0.0 0.0 6.84 09/07/2017 11:11:04 31 0.0 1 0.0 0.0 6.80 09/07/2017 11:11:24 28 0.0 0.0 0.0 6.62 09/07/2017 11:11:44 31 0.0 0.0 0.0 6.54 09/07/2017 11:12:04 27 0.0 0.0 0.0 6.48 09/07/2017 11:12:24 30 0.0 0.0 0.0 6.45 09/07/2017 11:12:44 29 0.0 0.0 0.0 6.38 09/07/2017 11:13:04 29 0.0 0.0 0.0 7.38 09/07/2017 11:13:24 29 0.0 0.0 0.0 8.47 Pepe 11 N 1S WYI CDS-316 MMe Alpine job mt Sep/07/2017 CuR er Conoco Job pompe 2540971 Oob M.. 2 r elork TrYtlll9 Pressure m WW B/M 5494 VoW. WJL T4 W1 VOWma BK D.Uay M." V/G 09/07/2017 11:14:04 31 0.0 0.0 0.0 8.46 09/07/2017 11:14:24 30 0.0 0.0 0.0 8.46 09/07/2017 11:14:44 31 0.0 0.0 0.0 7.70 09/07/2017 11:15:04 33 0.0 0.0 0.0 4.65 09/07/2017 11:15:24 30 0.0 0.0 0.0 4.35 09/07/2017 11:15:44 31 0.0 0.0 0.0 3.97 09/07/2017 11:16:04 30 0.0 0.0 0.0 3.93 09/07/2017 11:16:24 28 0.0 0.0 0.0 3.91 09/07/2017 11:16:44 30 0.0 0.0 0.0 3.B9 09/07/2017 11:17:04 29 0.0 0.0 0.0 3.89 09/07/2017 11:17:24 30 0.0 0.0 0.0 3.89 09/07/2017 11:17:44 28 0.0 0.0 0.0 3.87 09/07/2017 11:18:04 32 0.0 0.0 0.0 3.87 09/07/2017 11:18:24 65 0.0 0.0 0.0 3.87 09/07/2017 11:18:44 100 0.0 0.0 0.0 3.87 09/07/2017 11:19:04 79 0.0 0.0 0.0 3.86 09/07/2017 11:19:24 57 0.0 0.0 0.0 3.86 09/07/2017 11:19:44 33 0.0 0.0 0.0 3.86 09/07/2017 11:20:04 31 0.0 0.0 0.0 3.85 09/07/2017 11:20:24 32 0.0 0.0 0.0 3.85 09/07/2017 11:20:44 28 0.0 0.0 0.0 3.86 09/07/2017 11:21:04 28 0.0 0.0 0.0 3.85 09/07/2017 11:21:24 26 0.0 0.0 0.0 3.67 09/07/2017 11:21:44 28 0.0 0.0 0.0 3.31 09/07/2017 11:22:04 30 0.0 0.0 0.0 3.30 09/07/2017 11:22:24 28 0.0 0.0 0.0 3.30 09/07/2017 11:22:44 31 0.0 0.0 0.0 3.35 09/07/2017 11:23:04 29 0.0 0.0 0.0 3.43 09/07/2017 11:23:24 28 0.0 0.0 0.0 3.41 09/07/2017 11:23:44 32 0.0 0.0 0.0 3.40 09/07/2017 11:24:04 29 0.0 0.0 0.0 3.40 09/07/2017 11:24:24 27 0.0 0.0 0.0 3.40 09/07/2017 11:24:44 29 0.0 0.0. 0.0 3.40 09/07/2017 11:25:04 29 0.0 0.0 0.0 3.40 09/07/2017 11:25:24 29 0.0 0.0 0.0 3.40 09/07/2017 11:25:44 29 0.0 0.0 0.0 3.40 09/07/2017 11:26:04 29 0.0 0.0 0.0 3.50 09/07/2017 11:26:24 29 0.0 0.0 0.0 5.76 09/07/2017 11:26:44 31 0.0 0.0 0.0 8.33 09/07/2017 11:27:04 31 0.0 0.0 0.0 8.33 09/07/2017 11:27:24 30 0.0 0.0 0.0 8.33 09/07/2017 11:27:44 30 0.0 0.0 0.0 8.33 09/07/2017 11:28:04 29 1 0.0 0.0 0.0 8.33 09/07/2017 11:28:24 29 0.0 0.0 0.0 8.33 09/07/2017 11:28:44 31 0.0 0.0 0.0 8.33 09/07/2017 11:29:04 32 0.0 0.0 0.0 8.32 09/07/2017 11:29:24 3D 0.0 0.0 0.0 8.32 09/07/2017 11:29:44 31 0.0 0.0 0.0 8.33 09/07/2017 11:30:04 31 0.0 0.0 0.0 8.33 09/07/2017 11:30:24 32 0.0 0.0 0.0 8.34 09/07/2017 11:30:44 28 0.0 0.0 0.0 8.35 09/07/2017 11:31:04 28 0.0 0.0 0.0 8.36 09/07/2017 11:31:24 30 0.0 0.0 0.0 8.36 09/07/2017 11:31:44 30 0.0 0.0 0.0 8.35 PM 32o<19 Wall COS -316 Me14 Alpine Jab Sart Sep/07/2017 Cart4mm Conoco ap fte 2540971 pea Time 34-a aad� T.-aay 9reasu. m Raft R/M Raga VRluma Rce. Taal VMulne RR1 pMlaft V0/e a." 09/07/2017 11:32:24 31 0.0 0.0 0.0 8.36 09/07/2017 11:32:44 30 0.0 0.0 0.0 8.36 09/07/2017 11:33:04 31 0.0 0.0 0.0 8.36 09/07/2017 11:33:24 31 0.0 0.0 0.0 6.36 09/07/2017 11:33:44 30 0.0 0.0 0.0 8.35 09/07/2017 11:34:04 32 0.0 0.0 0.0 8.35 09/07/2017 11:34:24 31 0.0 0.0 0.0 8.36 09/07/2017 11:34:44 30 0.0 0.0 0.0 8.35 09/07/2017 11:35:04 30 0.0 0.0 0.0 8.35 09/07/2017 11:35:24 32 0.0 0.0 0.0 8.35 09/07/2017 11:35:44 30 0.0 0.0 0.0 8.35 09/07/2017 11:36:00 31 0.0 0.0 0.0 8.35 Halton dart latch w/1415 SMS 09/07/2017 11:36:04 31 0.0 - 0.0 0.0 8.36 09/07/2017 11:36:24 31 0.0 0.0 0.0 8.35 09/07/2017 11:36:44 29 0.0 0.0 0.0 8.35 09/07/2017 11:37:04 32 0.0 0.0 0.0 8.35 09/07/2017 11:37:24 31 0.0 0.0 0.0 8.35 09/07/2017 11:37:44 33 0.0 0.0 0.0 8.35 09/07/2017 11:38:04 33 0.0 0.0 0.0 8.35 09/07/2017 11:38:24 31 0.0 0.0 0.0 8.35 09/07/2017 11:38:44 33 0.0 0.0 0.0 8.35 09/07/2017 11:39:04 30 0.0 0.0 0.0 8.35 09/07/2017 11:39:24 28 0.0 0.0 0.0 8.19 - 09/07/2017 11:39:44 113 0.0 0.0 0.0 8.24 09/07/2017 11:40:04 82 0.0 0.0 0.0 7.20 09/07/2017 11:40:24 46 0.0 0.0 0.0 6.65 09/07/2017 11:40:44 35 0.0 0.0 0.0 5.13 09/07/2017 11:41:04 72 0.0 0.0 0.0 6.02 09/07/2017 11:41:24 79 0.0 0.0 0.0 6.69 09/07/2017 11:41:44 66 0.0 0.0 0.0 7.08 09/07/2017 11:42:04 44 0.0 0.0 0.0 8.30 09/07/2017 11:42:24 33 0.0 0.0 0.0 8.31 09/07/2017 11:42:44 59 0.0 0.0 0.0 8.31 09/07/2017 11:43:04 128 0.0 0.0 0.0 8.32 09/07/2017 11:43:24 120 0.0 0.0 0.0 8.29 09/07/2017 11:43:44 114 0.0 0.0 0.0 8.29 09/07/2017 11:44:04 60 0.0 0.0 0.0 7.39 09/07/2017 11:44:24 128 0.0 0.0 0.0 7.63 09/07/2017 11:44:44 126 0.0 0.0 0.0 7.62 09/07/2017 11:45:04 132 0.0 0.0 0.0 7.31 09/07/2017 11:45:24 125 0.0 0.0 0.0 7.38 09/07/2017 11:45:44 47 0.0 0.0 0.0 4.82 09/07/2017 11:46:04 45 0.0 0.0 0.0 6.43 09/07/2017 11:46:24 47 0.0 0.0 0.0 6.60 09/07/2017 11:46:44 122 0.0 0.0 0.0 7.24 09/07/2017 11:47:04 125 0.0 0.0 0.0 7.26 09/07/2017 11:47:24 7S 0.0 0.0 0.0 7.26 09/07/2017 11:47:44 73 0.0 0.0 0.0 7.27 09/07/2017 11:48:04 78 0.0 0.0 0.0 7.27 09/07/2017 11:48:24 47 0.0 0.0 0.0 4.49 09/07/2017 11:48:44 33 0.0 0.0 0.0 4.47 09/07/2017 11:49:04 52 0.0 0.0 0.0 6.30 09/07/2017 11:49:24 78 0.0 0.0 0.0 6.80 09/07/2017 11:49:44 81 0.0 0.0 0.0 6.91 9a9e 99 b'19. Wtll CDS-316 Fld4 Alpine 1a8 MaO Sep/07/2017 c9etenw Conoco 196 number 2540971 Dab hale 24 -hr doek Tw4HIhg PIeYl1Ie 9 Yb 8/M Stege Velume 881 TAW OendW V91hha1! WIG m Newge 09/07/2017 11:50:24 57 0.0 0.0 0.0 5.38 09/07/2017 11:50:44 58 0.0 0.0 0.0 6.18 09/07/2017 11:51:00 50 0.0 0.0 0.0 5.46 Top Mart latch w/1994 Aft 09/07/2017 11:51:04 44 0.0 0.0 0.0 5.69 09/07/2017 11:51:24 89 0.0 0.0 0.0 6.36 09/07/2017 11:51:44 136 0.0 0.0 0.0 6.83 09/07/2017 11:52:04 142 0.0 0.0 0.0 6.89 09/07/2017 11:52:24 143 0.0 0.0 0.0 6.89 09/07/2017 11:52:44 144 0.0 0.0 0.0 6.68 09/07/2017 11:53:04 154 0.0 0.0 0.0 7.22 09/07/2017 11:53:24 145 0.0 0.0 0.0 6.99 09/07/2017 11:53:44 140 0.0 0.0 0.0 7.14 09/07/2017 11:54:04 37 0.0 0.0 0.0 8.30 09/07/2017 11:54:24 31 0.0 0.0 0.0 8.30 09/07/2017 11:54:44 42 0.0 0.0 0.0 8.30 09/07/2017 11:55:04 29 0.0 0.0 0.0 8.30 09/07/2017 11:55:24 88 0.0 0.0 0.0 8.30 09/07/2017 11:55:44 81 0.0 0.0 0.0 8.30 09/07/2017 11:56:04 61 0.0 0.0 0.0 8.30 09/07/2017 11:56:24 31 0.0 0.0 0.0 8.30 09/07/2017 11:56:44 99 0.0 0.0 0.0 8.30 09/07/2017 11:57:04 54 0.0 0.0 0.0 8.31 09/07/2017 11:57:24 103 0.0 0.0 0.0 8.30 09/07/2017 11:57:44 93 0.0 0.0 0.0 8.30 09/07/2017 11:58:04 44 0.0 0.0 0.0 8.31 09/07/2017 11:58:24 35 0.0 0.0 0.0 8.31 09/07/2017 11:58:44 31 0.0 0.0 0.0 8.31 09/07/2017 11:59:04 43 0.0 0.0 0.0 8.31 09/07/2017 11:59:24 58 0.0 0.0 0.0 8.31 09/07/2017 11:59:44 52 0.0 0.0 0.0 8.31 09/07/2017 12:00:04 63 0.0 0.0 0.0 8.31 09/07/2017 12:00:24 118 0.0 0.0 0.0 8.30 09/07/2017 12:00:44 122 0.0 0.0 0.0 8.31 09/D7/2017 12:01:04 44 0.0 0.0 0.0 8.31 09/07/2017 12:01:24 71 0.0 0.0 0.0 8.30 09/07/2017 12:01:44 97 0.0 0.0 0.0 8.31 09/07/2017 12:02:04 124 0.0 0.0 0.0 8.30 09/07/2017 12:02:24 41 0.0 0.0 0.0 8.31 09/07/2017 12:02:44 35 0.0 0.0 0.0 8.31 09/07/2017 12:03:04 33 0.0 0.0 0.0 8.30 09/07/2017 12:03:24 31 0.0 0.0 0.0 8.31 09/07/2017 12:03:44 32 O.D 0.0 0.0 8.31 09/07/2017 12:04:04 35 0.0 0.0 0.0 8.31 09/07/2017 12:04:24 34 0.0 0.0 0.0 8.31 09/07/2017 12:04:44 35 0.0 0.0 0.0 8.30 09/07/2017 12:05:04 34 0.0 0.0 0.0 8.30 09/07/2017 12:05:24 32 0.0 0.0 0.0 8.30 09/07/2017 12:05:44 34 0.0 0.0 0.0 8.29 09/07/2017 12:06:04 35 0.0 0.0 0.0 8.27 09/07/2017 12:06:24 35 0.0 0.0 0.0 8.26 09/07/2017 12:06:44 35 0.0 0.0 0.0 8.24 09/07/2017 12:07:04 36 0.0 0.0 0.0 8.23 09/07/2017 12:07:24 35 0.0 0.0 0.0 8.21 09/07/2017 12:07!4 38 0.0 0.0 0.0 8.20 ft"14019 Well COS -316 14a14 Alpine lab Siad Se0/07/2017 Cuelamm Con= lab number 2540971 Dab In. l hr el r Treabq V.ns 99[ Rab a/" Stage volume am Teal Vq a ML be-" Mmpe {a/G 09/07/2017 12:08:24 37 0.0 0.0 0.0 8.17 09/07/2017 12:08:44 35 0.0 0.0 0.0 8.17 09/07/2017 12:09:04 36 0.0 0.0 0.0 8.16 09/07/2017 12:09:24 33 0.0 0.0 0.0 8.15 09/07/2017 12:09:44 35 0.0 0.0 0.0 8.14 09/07/2017 12:10:04 37 0.0 0.0 0.0 8.14 09/07/2017 12:10:24 36 0.0 0.0 0.0 8.13 09/07/2017 12:10:44 35 0.0 0.0 0.0 8.12 09/07/2017 12:11:04 35 0.0 0.0 0.0 8.12 09/07/2017 12:11:24 35 0.0 0.0 0.0 8.11 09/07/2017 09/07/2017 09/07/2017 12:11:44 12:12:04 12:12:24 35 35 35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.10 8.11 8.09 09/07/2017 12:12:44 37 0.0 0.0 0.0 -F 8.09 09/07/2017 09/07/2017 09/07/2017 12:13:04 12:13:24 12:13:44 37 34 35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.09 8.08 8.08 09/07/2017 12:14:04 34 0.0 0.0 0.0 8.07 09/07/2017 12:14:24 36 0.0 0.0 0.0 8.07 09/07/2017 12:14:44 34 0.0 0.0 0.0 8.06 09/07/2017 12:15:04 34 0.0 0.0 0.0 8.06 09/07/2017 12:15:24 33 0.0 0.0 0.0 8.06 09/07/2017 12:15:44 33 0.0 0.0 0.0 8.04 09/07/2017 12:16:04 35 0.0 0.0 0.0 8.03 09/07/2017 12:16:24 35 0.0 0.0 0.0 8.02 09/07/2017 12:16:44 35 0.0 0.0 0.0 7.95 09/07/2017 12:17:04 34 0.0 0.0 0.0 7.93 09/07/2017 12:17:24 35 0.0 0.0 0.0 6.67 09/07/2017 12:17:44 34 0.0 0.0 0.0 5.57 09/07/2017 12:18:04 36 0.0 0.0 0.0 4.26 09/07/2017 12:18:24 35 0.0 0.0 0.0 3.54 09/07/2017 12:18:44 33 0.0 0.0 0.0 2.84 09/07/2017 12:19:04 33 0.0 0.0 0.0 2.31 09/07/2017 12:19:24 33 0.0 0.0 0.0 1.95 09/07/2017 12:19:44 35 0.0 0.0 0.0 1.76 09/07/2017 12:20:04 35 0.0 0.0 0.0 0.00 09/07/2017 12:20:24 35 0.0 0.0 0.0 0.01 09/07/2017 12:20:44 35 0.0 0.0 0.0 0.01 09/07/2017 12:21:04 32 0.0 0.0 0.0 0.01 09/07/2017 12:21:24 36 0.0 0.0 0.0 0.00 09/07/2017 12:21:44 34 0.0 0.0 0.0 0.01 09/07/2017 12:22:04 33 0.0 0.0 0.0 0.00 09/07/2017 12:22:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:22:44 34 0.0 0.0 0.0 0.00 09/07/2017 12:23:04 33 0.0 0.0 0.0 0.01 09/07/2017 12:23:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:23:44 35 0.0 0.0 0.0 0.00 09/07/2017 12:24:04 32 0.0 0.0 0.0 0.01 09/07/2017 12:24:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:24:44 36 0.0 0.0 0.0 0.00 09/07/2017 12:25:04 33 0.0 0.0 0.0 0.00 09/07/2017 12:25:24 32 0.0 0.0 0.0 0.00 09/07/2017 12:25:44 32 0.0 0.0 0.0 0.00 09/07/2017 12:26:04 34 0.0 0.0 0.0 0.01 Paola 13 b 19 Well COS -316 new Alpine lab Sbut SW07/2017 Curtamar Conoco lab N.mber 2540971 Mb Tbne J r ala T.*, Proswro PSL bla B/H Slag. Valuma BBL Talal Valama BBL Owslq M." M/B 09/07/2017 12:26:44 32 0.0 0.0 0.0 0.00 09/07/2017 12:27:04 30 0.0 0.0 0.0 0.01 09/07/2017 12:27:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:27:44 33 0.0 0.0 0.0 0.01 09/07/2017 12:28:04 35 0.0 0.0 0.0 0.00 09/07/2017 12:28:24 34 0.0 0.0 0.0 0.01 09/07/2017 12:28:44 31 0.0 0.0 0.0 0.01 09/07/2017 12:29:04 33 0.0 0.0 0.0 0.00 09/07/2017 12:29:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:29:44 31 0.0 0.0 0.0 0.01 - 09/07/2017 12:30:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:30:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:30:44 33 0.0 0.0 0.0 0.00 09/07/2017 12:31:04 32 0.0 0.0 0.0 0.01 09/07/2017 12:31:24 32 0.0 0.0 0.0 0.00 09/07/2017 12:31:44 31 0.0 0.0 0.0 0.01 09/07/2017 12:32:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:32:24 32 0.0 0.0 0.0 0.00 09/07/2017 12:32:44 33 0.0 0.0 0.0 0.01 09/07/2017 12:33:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:33:24 31 0.0 0.0 0.0 0.00 09/07/2017 12:33:44 30 0.0 0.0 0.0 0.01 09/07/2017 12:34:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:34:24 30 0.0 0.0 0.0 0.00 09/07/2017 12:34:44 32 0.0 0.0 0.0 0.00 09/07/2017 12:35:04 32 0.0 0.0 0.0 0.01 09/07/2017 12:35:24 32 0.0 0.0 0.0 0.01 09/07/2017 12:35:44 31 0.0 0.0 0.0 0.01 09/07/2017 12:36:04 33 0.0 0.0 0.0 0.01 09/07/2017 12:36:24 31 0.0 0.0 0.0 0.00 09/07/2017 12:36:44 33 0.0 0.0 0.0 0.00 09/07/2017 12:37:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:37:24 33 0.0 0.0 0.0 0.00 09/07/2017 12:37:" 32 0.0 0.0 0.0 0.01 09/07/2017 12:38:04 32 0.0 0.0 0.0 0.00 09/07/2017 12:38:24 32 0.0 0.0 0.0 0.01 09/07/2017 12:38:44 31 0.0 0.0 0.0 0.00 09/07/2017 12:39:04 30 0.0 0.0 0.0 0.00 09/07/2017 12:39:24 33 0.0 0.0 0.0 0.00 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 12:39:44 12:40:04 12:40:24 12:40:44 12:41:04 12:41:24 12:41:" 33 34 33 31 34 32 33 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.00 0.01 0.00 0.01 09/07/2017 12:42:04 33 0.0 0.0 0.0 0.01 09/07/2017 12:42:24 32 0.0 0.0 0.0 0.01 09/07/2017 12:42:44 33 0.0 0.0 0.0 0.00 09/07/2017 12:43:04 33 0.0 0.0 0.0 0.01 09/07/2017 12:43:24 32 0.0 0.0 0.0 0.00 12:43:44 31 0.0 0.0 0.0 0.01 F09107/2017 12:44:04 33 0.0 0.0 0.0 0.00 12:44:24 33 0.0 0.0 0.0 0.00 P.9.1Ba119 Well FI.M loa 9 " N ier 3u6 Mum 111 COS -316 0.0 Alpine Sap/07/2017 Conoco 2540971 Deq MM Treetlm3 Rate Saw Total a Otv M." ] r P.. a/M Valume I VoWme 19/6 rJ44k am oel am 0.0 09/07/2017 12:45:04 09/07/2017 12:45:24 09/07/2017 12:45:44 09/07/2017 12:46:00 09/07/2017 12:46:04 09/07/2017 12:46:24 09/07/2017 12:46:44 09/07/2017 12:47:04 09/07/2017 12:47:24 09/07/2017 12:47:44 09/07/2017 12:48:04 09/07/2017 12:48:24 09/07/2017 12:48:44 09/07/2017 12:49:04 09/07/2017 12:49:24 09/07/2017 12:49:44 09/07/2017 12:50:04 09/07/2017 12:50:24 09/07/2017 12:50:44 09/07/2017 12:51:04 09/07/2017 12:51:24 09/07/2017 12:51:44 09/07/2017 12:52:00 09/07/2017 12:52:04 09/07/2017 12:52:24 09/07/2017 12:52:44 09/07/2017 12:53:04 09/07/2017 12:53:24 09/07/2017 12:53:44 09/07/2017 12:54:04 09/07/2017 12:54:24 09/07/2017 12:54:44 09/07/2017 12:55:04 09/07/2017 12:55:24 09/0/2017 12:55:44 09/07/2017 12:56:04 09/07/2017 12:56:24 09/07/2017 12:56:44 09/07/2017 12:57:04 09/07/2017 12:57:24 09/07/2017 12:57:44 09/07/2017 12:58:04 09/07/2017 12:58:24 09/07/2017 12:58:44 09/07/2017 12:59:04 09/07/2017 12:59:24 09/07/2017 12:59:44 09/07/2017 13:00:04 09/07/2017 13:00:24 09/07/2017 13:00:44 09/07/2017 13:01:04 09/07/2017 13:01:24 09/07/2017 13:01:44 09/07/2017 13:02:04 3410.0 0.0 0.0 0.00 31 0.0 0.0 0.00 32 0.0 0.0 0.00 35 0.0 0.0 0.00 Top plug lands w/ 4063 Arks 34 0.0 0.0 0.00 33 0.0 0.0 0.00 32 32 0.0 0.0 0.0 0.0 0.00 0.00 34 32 33 33 35 33 31 32 32 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OA 0.0 D.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 32 0.0 0.0 0.0 0.01 35 0.0 0.0 0.0 0.00 31 0.0 0.0 0.0 0.01 34 0.0 0.0 0.0 0.00 33 0.0 0.0 0.0 0.01 30 0.0 0.0 0.0 0.00 preside up 33 0.0 0.0 0.0 0.00 33 0.0 0.0 0.0 0.01 33 0.0 0.0 0.0 0.00 32 0.0 0.0 0.0 0.01 33 0.0 0.0 0.0 0.01 31 0.0 0.0 0.0 0.00 34 0.0 0.0 0.0 0.00 31 0.0 0.0 0.0 0.01 32 0.0 0.0 0.0 0.00 31 0.0 0.0 0.0 0.01 34 0.0 0.0 0.0 0.01 33 d 0.0 0.0 0.0 0.00 32 0.0 0.0 0.0 0.00 35 33 33 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.01 0.01 35 0.0 0.0 0.0 0.01 33 0.0 0.0 0.0 0.00 39 0.0 0.0 0.0 0.01 46 0.0 0.0 0.0 0.00 46 0.0 0.0 0.0 0.00 49 0.0 0.0 0.0 0.01 51 0.0 0.0 0.0 0.00 54 0.0 0.0 0.0 0.01 56 0.0 0.0 0.0 0.00 53 0.0 0.0 0.0 0.00 53 0.0 0.0 0.0 0.01 51 0.0 0.0 0.a 0.00 52 0.00.0 0.0 0.00 104 0.0 0.0 0.0 0.00 120 0.0 0.0 0.0 0.01 9N417019 wa CD5-316 Eatl4 Alpine jnb B Sep/07/2017 Ceflamer Conoco lob Rumor 2540971 B4te time 14#r do Trc1Bn0 Fmurc m Rahe B/H M" VWume BBL 7ew1 YWume YL Beatty U/B Rers94 09/07/2017 13:02:44 54 0.0 0.0 0.0 0.00 09/07/2017 13:03:04 49 0.0 0.0 0.0 0.01 09/07/2017 13:03:24 51 0.0 0.0 0.0 0.01 09/07/2017 13:03:44 47 0.0 0.0 0.0 0.01 09/07/2017 13:04:04 48 0.0 0.0 0.0 0.00 09/07/2017 13:04:24 45 0.0 0.0 0.0 0.00 09/07/2017 13:04:44 40 0.0 0.0 0.0 0.01 09/07/2017 13:05:04 37 0.0 0.0 0.0 0.01 09/07/2017 09/07/2017 13:05:24 13:05:44 37 35 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.00 09/07/2017 13:06:04 33 0.0 0.0 0.0 0.01 09/07/2017 13:06;24 31 0.0 0.0 0.0 0.00 09/07/2017 13:06:44 35 0.0 0.0 0.0 0.01 09/07/2017 13:07:04 33 0.0 0.0 0.0 0.00 09/07/2017 13:07:24 31 0.0 0.0 0.0 0.00 09/07/2017 13:07:44 31 0.0 0.0 0.0 0.01 09/07/2017 13:08:04 33 0.0 0.0 0.0 0.00 09/07/2017 13:08:24 33 0.0 0.0 0.0 0.01 09/07/2017 13:08:44 33 0.0 0.0 0.0 0.01 09/07/2017 13:09:04 34 0.0 0.0 0.0 0.00 09/07/2017 13:09:24 32 0.0 0.0 0.0 0.00 09/07/2017 13:09:44 32 0.0 0.0 0.0 0.00 09/07/2017 13:10:04 33 0.0 0.0 0.0 0.00 09/07/2017 13:10:24 33 0.0 0.0 0.0 0.00 09/07/2017 13:10:44 32 0.0 0.0 0.0 0.01 09/07/2017 13:11:04 33 0.0 0.0 0.0 0.01 09/07/2017 13:11:24 35 0.0 0.0 0.0 0.01 09/07/2017 13:11:44 33 0.0 0.0 0.0 0.01 09/07/2017 13:12:04 35 0.0 0.0 0.0 0.00 09/07/2017 13:12:24 32 0.0 0.0 0.0 -0.00 09/07/2017 13:12:44 32 0.0 0.0 0.0 0.00 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09/07/2017 13:13:04 13:13:24 13:13:44 13:14:04 13:14:24 13:14:44 13:15:00 35 33 33 31 35 33 32 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.00 0.00 0.00 0.01 0.01 0.01 Ra9ea from tool. End job 09/07/2017 13:15:04 31 0.0 0.0 0.0 0.00 09/07/2017 13:15:24 33 0.0 0.0 0.0 0.01 09/07/2017 13:15:44 33 0.0 0.0 0.0 0.01 09/07/2017 09/07/2017 09/07/2017 09/07/2017 09)07/2017 09/07/201713:17:44 09/07/2017 09/07/2017 13:16:04 13:16:24 13:16:44 13.17:04 1117:24 13:18:04 13:18:24 33 33 33 33 31 31 32 32 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 0.0 0.0 0.0 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 09/07/2017 13:18:44 32 0.0 0.0 0.0 0.00 09/07/2017 13:19:04 30 0.0 0.0 0.0 0.00 09/07/2017 13:19:24 31 0.0 0.0 0.0 0.01 09/07/2017 13:19:44 32 0.0 0.0 0.0 0.01 09/07/2017 13:20:04 31 0.0 0.0 0.0 0.00 Pu9u 18 0 19 Well CDS-316 NNg Alpine ]ebS Sep/07/2017 CURemer Conoco ]cob Numbm 2540971 Dent Tlme 2 r doC TI -well li a P8! Wte N/M S4ge Wile. NBL TiNI DeneNV NaeNpe Velum. W/D BBL 09/07/2017 13:20:44 31 0.0 0.0 0.0 0.01 09/07/2017 13:21:04 31 0.0 0.0 0.0 -0.00 09/07/2017 13:21:24 32 0.0 0.0 0.0 0.00 09/07/2017 13:21:44 31 0.0 0.0 0.0 0.00 09/07/2017 13:22:04 31 0.0 0.0 0.0 0.00 09/07/2017 13:22:24 32 0.0 0.0 0.0 0.00 09/07/2017 13:22:44 34 0.0 0.0 0.0 0.00 09/07/2017 13:23:04 31 0.0 0.0 0.0 0.00 09/07/2017 13:23:24 31 0.0 0.0 0.0 0.00 09/07/2017 13:23:44 31 0.0 0.0 0.0 0.00 09/07/2017 13:24:04 31 0.0 0.0 0.0 0.01 09/07/2017 13:24:24 32 0.0 0.0 0.0 0.00 09/07/2017 13:24:44 32 0.0 0.0 0.0 0.00 09/07/2017 13:25:04 31 0.0 0.0 0.0 0.00 09/07/2017 13:25:24 33 0.0 0.0 0.0 0.00 09/07/2017 13:25:44 33 0.0 0.0 0.0 0.00 09/07/2017 13:26:04 31 0.0 0.0 0.0 0.00 09/07/2017 13:26:24 33 0.0 0.0 0.0 0.01 09/07/2017 13:26:44 31 0.0 0.0 0.0 0.00 09/07/2017 1 13:27:04 1 32 1 0.0 1 0.0 0.0 0.00 Post 3ob Summary R9t 19&19 4Wmge Meem Neteq bM/min VelPnle a MUM tr0e4TN, bW Min, 3.4 N2 Mu4 NMgmmn Nate 4.1 Tatty Slurry 60.0 NW 406.0 sm. 40.0 N2 Traetleg Pwwre t .." PW BreebgaYen Rum Meaimum 4262 MrN 30 AVWege 127 aYTP Mug tP 3900 M kd. Type VNume bbl D wty Ib/gal A". N2 Percent % DesignM Merry Velum. 59.0 bbi Mplewment 426.0 bbl MleW~Temp 81 gegF Cement CDWletee le SPrMcel Velem- bbl Wa M. Park TP It Cuebmm or I1uMeA." Nepruen . Ken Scblumtwger Supertiver Tel Simeon Uwlatitn lM ❑ 34b C.~ ❑2 R9t 19&19 Loepp, Victoria T (DOA) From: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Sent: Thursday, September 14, 2017 7:03 AM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]Re: [EXTERNAL]RE: [EXTERNAL]RE: [EXTERNAL]FW: CD5-316 (PTD # 217-040) TD Extension Follow Up Flag: Follow up Flag Status: Flagged Thanks Victoria. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov] Sent: Thursday, September 14, 2017 7:01 AM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Subject: [EXTERNAL]Re: [EXTERNAL]RE: [EXTERNAL]RE: [EXTERNAL]FW: CD5-316 (PTD #217-040) TD Extension Verbal approval is granted for the revised drilling PTD 217-040. Thanx, Victoria Sent from my iPhone On Sep 13, 2017, at 3:31 PM, Dai, Weifeng<Weifeng.Dai@conocophillips.com> wrote: We start drilling lateral this morning, we need your approval as soon as you can. BLM already orally approve the sundry. Could I get your oral approval first? Sent from my iPhone On Sep 13, 2017, at 2:55 PM, Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> wrote: I have the permit now. What's the status of drilling? From: Singh, Angela K (DOA) Sent: Wednesday, September 13, 2017 12:42 PM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Cc: Loepp, Victoria T (DOA) <yictoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]RE: [EXTERNAL]FW: CD5-316 (PTD #217-040) TD Extension Hi Weifeng, Just letting you know that you emailed me instead of Victoria... Ccing her so she's in the loop. O Thank you, Angela From: Dai, Weifeng [mailto:Weifeng.Dai@conocophillips.coml Sent: Wednesday, September 13, 2017 12:41 PM To: Singh, Angela K (DOA) <angela.singh@alaska.gov> Subject: Re: [EXTERNALIRE: [EXTERNAL]FW: CD5-316 (PTD #217-040) TO Extension Morning Victoria, Have you gotten a chance to review the permit? Sent from my iPhone On Sep 12, 2017, at 11:19 AM, Singh, Angela K (DOA) <angela.singh@alaska.gov> wrote: No worries! O Thank you Angela From: Dai, Weifeng [mailto:Weifeng.Dai@conocophillips.comj Sent: Tuesday, September 12, 2017 11:17 AM To: Singh, Angela K (DOA) <angela.singh@alaska.gov> Cc: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty Sherrod @contractor.conocophillips.com> Subject: Re: [EXTERNAL]FW: CD5-316 (PTD #217-040) TO Extension Sorry Angela, it is weird that the form is out dated, I edit it over the one that submitted last month. Anyway, I will double check next time. Sent from my Phone On Sep 12, 2017, at 10:17 AM, Singh, Angela K (DOA) <angela.singh@alaska.gov> wrote: Good morning Weifeng, Just a reminder for future submissions... please submit any 10-4xx forms on the current form. This one arrived using the form revised 11 /2015, while we have a more recently updated form on our website. This time, we will be able to accept this outdated form for this revised application today. Thank you, Angela Singh Office Assistant 11 Alaska Oil and Gas Conservation Commission 333 W. 71h Ave. Anchorage, AK 99501-3572 907.793.1230 (phone) 907.276.7542 (fax) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Angela Singh at (907) 793-1230 or onaelo.singhCalaska.gov. From: Loepp, Victoria T (DOA) Sent: Tuesday, September 12, 2017 9:10 AM To: Bettis, Patricia K (DOA) <patricia.bettis@alaska.xov> Cc: Singh, Angela K (DOA) <angela.singh@alaska.gov> Subject: FW: CD5-316 (PTD #217-040) TD Extension Patricia, Another revision — lateral extension- will be submitted this morning. Angela, Please route this PTD Revision to Patricia as soon as it arrives. Thanx, Victoria From: Dai, Weifeng [mailto:Weifeng.Dai@conocophillips.com] Sent: Tuesday, September 12, 2017 5:35 AM To: Loepp, Victoria T (DOA) <victona.loepp@alaska.eov> Subject: CD5-316 (PTD #217-040) TD Extension Morning Victoria, ConocoPhillips intends to extend the TD of CD5-316. The reason for the extension in lateral length is for potential sand body extension which we have seen in offset well lately. I am printing hard copy of the attached and will send your way for review and approval. Please let me know if you have any questions. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 <1. CD5-316 Extended TD AOGCC PTD.docx> <2. CD5-316 10-401.xlsx> Loepp, Victoria T (DOA) From: Regg, James B (DOA) Sent: Wednesday, September 06, 2017 3:33 PM To: Loepp, Victoria T (DOA) Subject: RE: CD5-316 (PTD #217-040) BOP Test Extension Follow Up Flag: Follow up Flag Status: Flagged Excellent response; thank you! Jim Regg Supervisor, Inspections AOGCC 333 W.7t' Ave, Suite 100 Anchorage, AK 99501 907-793-1236 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907- 793-1236 or iim.re¢e@alaska.aov. From: Loepp, Victoria T (DOA) Sent: Wednesday, September 6, 2017 3:25 PM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Cc: Regg, James B (DOA) <jim.regg@alaska.gov> Subject: RE: CD5-316 (PTD #217-040) BOP Test Extension Weifeng, A BOP test extension is granted until after the cement job is complete. However, the BOP should have been tested prior to running the 7" liner. CPAI should be targeting the testing of the BCPs in the 10 to 14 day range instead of running up against the 14 day BOP test time limit. The only exceptions for an extension beyond 14 days are emergency situations such as the well is in an active well control situation or you are stuck in hole. These extensions may not be granted in the future so planning to test in the 10 to 14 day window becomes imperative. Victoria From: Dai, Weifeng(mailto:Weifene.Dai@conocophillips.com] Sent: Wednesday, September 06, 2017 2:46 PM To: Loepp, Victoria T (DOA) <victoria.loeop@alaska.xov> Subject: CD5-316 (PTD #217-040) BOP Test Extension Hi Victoria, The rig Doyon 19 is drilling CD5-316 (PTD #217-040) at CRU for ConocoPhillips. We TD the 8-1/2" x 9-7/8" intermediate 2 section at 19,342' MD and land in Kuparuk C sand horizontally on September 1-. The 7" liner run was pretty clean until entered into Kalubik shale since yesterday morning 5 o'clock which indicates Kalubik shale collapsed, we were fortunate Loepp, Victoria T (DOA) From: Regg, James B (DOA) Sent: Wednesday, September 06, 2017 3:33 PM To: Loepp, Victoria T (DOA) Subject: RE: CD5-316 (PTD #217-040) BOP Test Extension Follow Up Flag: Follow up Flag Status: Flagged Excellent response; thank you! Jim Regg Supervisor, Inspections AOGCC 333 W.7'h Ave, Suite 100 Anchorage, AK 99501 907-793-1236 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907- 793-1236 or iim.reee@alaska.eov. From: Loepp, Victoria T (DOA) Sent: Wednesday, September 6, 2017 3:25 PM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Cc: Regg, James B (DOA) <jim.regg@alaska.gov> Subject: RE: CDS-316 (PTD #217-040) BOP Test Extension Weifeng, A BOP test extension is granted until after the cementjob is complete. However, the BOP should have been tested prior to running the 7" liner. CPA] should be targeting the testing of the BOPS in the 10 to 14 day range instead of running up against the 14 day BOP test time limit. The only exceptions for an extension beyond 14 days are emergency situations such as the well is in an active well control situation or you are stuck in hole. These extensions may not be granted in the future so planning to test in the 10 to 14 day window becomes imperative. Victoria From: Dai, Weifeng fmailto:Weifeng.Dai@conocophillips.com] Sent: Wednesday, September 06, 2017 2:46 PM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov> Subject: CD5-316 (PTD #217-040) BOP Test Extension Hi Victoria, The rig Doyon 19 is drilling CDS-316 (PTD #217-040) at CRU for ConocoPhillips. We TD the 8-1/2" x 9-7/8" intermediate 2 section at 19,342' MD and land in Kuparuk C sand horizontally on September 1". The 7" liner run was pretty clean until entered into Kalubik shale since yesterday morning 5 o'clock which indicates Kalubik shale collapsed, we were fortunate to be able to work the liner down to bottom this morning, and we are currently trying to building up circulation before cement job. The circulation building up was slow and we are making limited progress by now, we are anticipating it will take longer based on current pace and can potentially put us make us not able to conduct the BOP test before due day which is tomorrow. Our original plan is perform BOP test after cement job and we shall be able to make it should the liner run and circulation went well. Considering the rig operation status, ConocoPhillips would like to request BOP test extension until we complete 7" liner cement job as it is extremely difficult to perform BOP test before cement job and can introduce significant risk to the well. Our current plan is to conduct BOP test right after cement job whenever we can finish it, we have 13-3/8" storm packer on location that can hang off string after cement job. Please grant the BOP test extension and let me know if you have any questions or concerns. The schematic below is for your reference. to be able to work the liner down to bottom this morning, and we are currently trying to building up circulation before cement job. The circulation building up was slow and we are making limited progress by now, we are anticipating it will take longer based on current pace and can potentially put us make us not able to conduct the BOP test before due day which is tomorrow. Our original plan is perform BOP test after cement job and we shall be able to make it should the liner run and circulation went well. Considering the rig operation status, ConocoPhillips would like to request BOP test extension until we complete 7" liner cement job as it is extremely difficult to perform BOP test before cement job and can introduce significant risk to the well. Our current plan is to conduct BOP test right after cement job whenever we can finish it, we have 13-3/8" storm packer on location that can hang off string after cement job. Please grant the BOP test extension and let me know if you have any questions or concerns. The schematic below is for your reference. CD5-316 Current Schematic 9-61S" Liner lop @ 1,987' Kalubik shale collapsed Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 Cl 20" MJa w.a.a COACIU or 13-3:8" 684 L-80 BTC 2,360' MD 12,175'7.0 TOC 7,950' MD; 4,2W r D (SW MO above Sub97) 9-W 40k LSO BTC -M Liner 13.83+ MD 16 068' TVD Top of HRZ shale @ 17,694 M017,226' Top of KaWbik shale C 18,034' MD77,306' Boftom of Kaluhik Q 19,269' MD/7,440' TO 19,342' MDI 7,436' ft MD CD6-316 Current Schema0c 29- HiQ WfWaO ConQvctoi 1'. 13.38" 689 L-80 BTC 2,360' MD; 2.175 T'.'D TOC -7,950' MO r 4,2W 7.+0 (500' MD swve Sub57) 9-5N'409 L-80 BTC -M Liner 13.83E h1D 16 068' WD Top of HRZ shale @ 17,699 MDf7,2.''6' Top of Kalubik shale Q 18,034' MD17,306' Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 Loepp, Victoria T (DOA) From: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Sent: Thursday, September 07, 2017 12:51 PM To: Loepp, Victoria T (DOA) Cc: Regg, James B (DOA) Subject: RE: [EXTERNAL]RE: CD5-316 (PTD #217-040) BOP Test Extension Follow Up Flag: Follow up Flag Status: Flagged Morning Victoria, Just want to give you update on current well CD5-316, we were able to build full circulation this morning and just completed the cement job, all went well. Per current schedule, we shall start BOP test in next couple of hours. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Dai, Weifeng Sent: Wednesday, September 06, 2017 3:54 PM To:'Loepp, Victoria T (DOA)' <victoria.loepp@alaska.gov> Cc: Regg, James B (DOA) <jim.regg@alaska.gov> Subject: RE: [EXTERNAL]RE: C135-316 (PTD #217-040) BOP Test Extension Thanks a lot for the extension, Victoria. ConocoPhillips is always very prudent on planning BOP test to ensure we don't exceed due day, including this one. Should we didn't have shale collapse issue, we shall able to perform BOP test at least 2 days before the due day. Historically, we were quite successful managing shale on CD5 so far, this one caught us a little off guard, unfortunately. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.govj Sent: Wednesday, September 06, 2017 3:25 PM To: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Cc: Regg, James B (DOA) <iim.regg@alaska.gov> Subject: [EXTERNAL]RE: CD5-316 (PTD #217-040) BOP Test Extension Weifeng, A BOP test extension is granted until after the cement job is complete. However, the BOP should have been tested prior to running the 7" liner. CPAI should be targeting the testing of the BOPS in the 10 to 14 day range instead of running up against the 14 day BOP test time limit. The only exceptions for an extension beyond 14 days are emergency situations such as the well is in an active well control situation or you are stuck in hole. These extensions may not be granted in the future so planning to test in the 10 to 14 day window becomes imperative. Victoria From: Dai, Weifeng[mailto:Weifeng.Dai@conocophillips.comj Sent: Wednesday, September 06, 2017 2:46 PM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov> Subject: CD5-316 (PTD #217-040) BOP Test Extension Hi Victoria, The rig Doyon 19 is drilling CD5-316 (PTD #217-040) at CRU for ConocoPhillips. We TD the 8-1/2" x 9-7/8" intermediate 2 section at 19,342' MD and land in Kuparuk C sand horizontally on September 1-. The 7" liner run was pretty clean until entered into Kalubik shale since yesterday morning 5 o'clock which indicates Kalubik shale collapsed, we were fortunate to be able to work the liner down to bottom this morning, and we are currently trying to building up circulation before cement job. The circulation building up was slow and we are making limited progress by now, we are anticipating it will take longer based on current pace and can potentially put us make us not able to conduct the BOP test before due day which is tomorrow. Our original plan is perform BOP test after cement job and we shall be able to make it should the liner run and circulation went well. Considering the rig operation status, ConocoPhillips would like to request BOP test extension until we complete 7" liner cement job as it is extremely difficult to perform BOP test before cement job and can introduce significant risk to the well. Our current plan is to conduct BOP test right after cement job whenever we can finish it, we have 13-3/8" storm packer on location that can hang off string after cement job. Please grant the BOP test extension and let me know if you have any questions or concerns. The schematic below is for your reference. CD5-316 Current Schematic 29- nsc rleltlea Con¢ixtor nE 13-318" 689 L-80 BTC 2.3W MD I TOC -7,950' MD 14,200' r,10 (500' MD above SuD97) 9.518" 409 L40 BTC -M Liner 13 839' h1D 16.068' T'D Top of HRZ shale @ 17,694' M017 2216' Tap of KaiuDik shave Q 18,034' MD17,306' Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 CD6-316 Proposed P&A Schematic 29• x410 welosa conmwmr its ................................... 9-518" Liner Top a 1.987' f 5�31p" D8 .175 aTC ZS6?' MD! 2.1?5'tW ................................ wanes TOCID am MD, 71 TFJ f500' M1 a00va 9ua5?; 12 %- open MID ssle oa0 L41s etc41r IJMt 117 ppg Class G Cement to (200' inside casing Mora.02srm .... ..... ..P� 13 63 .........5 MD . _..__. 9 shoe) 12,839 .. JY inc,zZs• as OKI & 18 17 ppg Class G CementBottom (M 14,139' MD (30P below casing shoe) 15.8 ppg Class G Cement Top (Q 15,560' MD rag kx 15.8 ppg Class G Cement Bottom @ 16,000,' MD i 15.8 ppg Class G Cement Top jo 18,386' MD P1 gg Top of Kalubik Shale Q 18,903MD 15.8 ppg Class G Cement Bottom @ 18,903 MD Tap of Kupswk C sand.(M,19,415' M4......._.. N.c 'Open HOW 19 53?31D• 7.M?I MD Loepp, Victoria T (DOA) From: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Sent: Wednesday, August 23, 2017 9:13 AM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]Re: CDS-316 (PTD # 217-040) Attachments: CD5-316 Pilot Hole P&A Update.pdf Follow Up Flag: Follow up Flag Status: Flagged Thanks Victoria, Kalubik shale and Kuparuk C sand depth included in the attached. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov] Sent: Wednesday, August 23, 2017 9:07 AM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Subject: [EXTERNAL]Re: CD5-316 (PTD # 217-040) Weifeng, Approval is granted for the plugging procedure outlined below. Please forward a wellbore schematic that shows the Kuparuk C sand and the Kalubik depths and plug placement as discussed. Thanx, Victoria Sent from my iPhone On Aug 23, 2017, at 8:59 AM, Dai, Weifeng<Weifene.Dai@conocophillips.com> wrote: Morning Victoria, As discussed via phone, we drilled CD5-316 pilot hole to TD and drilled through Kuparuk C sand, the sand top MD is 19,415'. The Kalubik shale collapsed and caused pack off on drilling BHA after TD while we perform draw down test for pore pressure. We were able to work the BHA above the Kalubik shale and re-established full circulation. Then weight up mud and POOH BHA yesterday morning. We are running in hole the cement stinger to Kalubik shale this morning and saw packed off when attempting to establish circulation. Lithology wise, there is nothing in between Kuapruk C sand and Kalubik shale. To minimize the risk for the plugjob, ConocoPhillips proposes to spot the plug #1 above Kalubik shale instead of TD. The updated P&A plan is attached. We will tag the top of plug after cement set as originally planned . Please advise and let us know at earliest convenience, please feel free to let me know if you have any questions. Weifeng Office: (907)-2634324 Cell Phone: (907)-342-9508 <CD5-316 Pilot Hole P&A Update.pdf> Loepp, Victoria T (DOA) From: Regg, James B (DOA) Sent: Friday, July 07, 2017 1:41 PM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Follow Up Flag: Follow up Flag Status: Flagged Just what we needed. I will send the info to the rig folder for Doyon 19. Jim Regg Supervisor, Inspections AOGCC 333 W.7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state orfederal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907- 793-1236 or i im.reggCdalaska.eov. From: Dai, Weifeng [mailto:Weifeng.Dai@conocophillips.com] Sent: Friday, July 7, 2017 8:21 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Cc: Regg, James B (DOA) <jim.regg@alaska.gov> Subject: RE: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Victoria, Please check the attached the choke and kill hose data books for your review. The rated temperature, mfg safety factor and pressure test charts and rating are included. Please let me know if you need anything else. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.eov] Sent: Thursday, July 06, 20171:28 PM To: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Cc: Regg, James B (DOA) <jim.regg@alaska.eov> Subject: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Weifeng, Please provide specifications(temperature and pressure ratings) and testing data on the Coflex line hoses proposed for the choke and kill -line sides of the BOP stack. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil 8 Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. LoeoD(&aiaska.aov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)7931247 or Victorio.LoeooQalaska.aov conflnential CONTITECH ContiTech Oil & Marine, Corp. 11535 Brittmoore Park Drive Houston, Texas 77041 Tel. +1 (832) 327 0141 email: sales@fluid.contitech.us Fax.+1 (832) 327 0148 website: w .contitech-oil-marine.us Choke & Kill Hose (Smooth Bore) Customer Name Doyon Drilling Contact Bruce Spittler Customer Enquiry No. Alaska ContiTech Beattie Enquiry No. PBC16568 Revision 10000 psi Line No. 1 Description 3" x 20ft, 5000psi Choke and Kill Service Hose, Temperature Range B, API Spec 16C, Tag No API Spec 16C - Monogrammed Qty 1 Hose Specification Service General Choke and Kill Service Bore Size 3" Length 20 Feet Working Pressure 5000 psi Test Pressure 10000 psi Safety Factor 3 Temperature Range -20 to 100°C Design Standard API Spec 16C - Monogrammed Constuction Fire rated Outside Diameter 177 mm Hose Weight 48 kg per metre MBR (Stomge) 1.5 m MBR (Operation) 1.6 m Sour Service Yes End A End B Fitting Type Flange, API Spec. 6A Fitting Type Flange, API Spec. 6A Formation Butt Welded Formation Butt Welded Groove Inlay Stainless Steel 316L Grove Inlay Stainless Steel 316L Bore Size 3" Bore Size 3" End Fitting Size 3.1/8" End Fitting Size 3.1/8" Type 6B Type 6B Ring Groove R35 Ring Groove R35 Sour Service To NACE MR01-75 Latest Rev Sour Service To NACE MROt-75 Latest Rev Arrangement Drawing 20 Feet Continental ContiTech Oil & Marine, Corp. 11535 Brittmoore Park Drive Houston, Texas 77041 Tel. +1 (832) 327 0141 email: sales@fluid.contitech.us Fax. +1 (832) 327 0148 website: www.contitechoil-marine.us Choke and Kill Temp B Customer Name Doyon Drilling Contact Bruce Spittler Customer Enquiry No. RFQ ContiTech Beattie Enquiry No. 20002037 Revision 10000 psi Line No. 1 Description 2" x 22ft, 5000psi Choke and Kill Service Hose, Temperature Range B, API Spec 16C, Tag No. API Spec 16C - Monogrammed Qty 1 Hose Specification Service Choke and Kill Bore Size 2" Length 22 Feet Working Pressure 5000 psi Test Pressure 10000 psi Safety Factor 3 Temperature Range -20 to 1001C Design Standard API Spec 16C - Monogrammed Constuction Fire rated (Lloyds OD 1000/499 @ 700 Deg C For Minimum 30 Minutes) Outside Diameter 128 mm Hose Weight 29 kg per metre MBR (Storage) 0.9 m MBR (Operation) 0.9 m Sour Service Yes End A End B Fitting Type Flange, API Spec. 6A Fitting Type Flange, API Spec, 6A Formation Butt Welded Formation Butt Welded Groove Inlay Stainless Steel 316 Groove Inlay Stainless Steel 316 Bore Size 3- Bore Size 3 - End Fitting Size 3.1/6" End Fitting Size 3.1/8" Type 6B Type 6B Ring Groove R35 Ring Groove R35 Sour Service To NACE MROt-75 Latest Rev Sour Service To NACE MR01-75 Latest Rev Arrangement Drawing 22 Feet (Quote Ref: 2000203711 (End) Page 3 Loepp, Victoria T (DOA) From: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Sent: Friday, July 07, 2017 8:21 AM To: Loepp, Victoria T (DOA) Cc: Regg, James B (DOA) Subject: RE: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Attachments: Kill-Specifications.pdf; Kill - Data Book.pdf, Choke-Specifications.pdf, Choke - Data Book.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, Please check the attached the choke and kill hose data books for your review. The rated temperature, mfg safety factor and pressure test charts and rating are included. Please let me know if you need anything else. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov] Sent: Thursday, July 06, 2017 1:28 PM To: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Cc: Regg, lames B (DOA) <jim.regg@alaska.gov> Subject: (EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Weifeng, Please provide specifications(temperature and pressure ratings) and testing data on the Coflex line hoses proposed for the choke and kill -line sides of the BOP stack. Thanx, Victoria Victoria Lci Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(a)a laska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)7931247 or VictoriaLoe?Maalaskg.gov Loepp, Victoria T (DOA) From: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Sent: Wednesday, July 05, 2017 11:07 AM To: Loepp, Victoria T (DOA) Subject: CD5-316 (PTD # 217-040) PTD Update Attachments: APD CDS-316_Update_7.5.17.doc Follow Up Flag: Follow up Flag Status: Flagged Hi Victoria, ConocoPhillips apply to make a couple of changes in the approved CD5-316 PTD as described below. I enclosed the update PTD drilling program part, the changes are highlighted in yellow. Below is the quick summary of the changes as well. 1. Page 9, step 11, ConocoPhillips apply to lower the minimum acceptable LOT/FIT to 12.0 ppg EMW at 13-3/8" surface casing shoe, ConocoPhililps still plan to cap the max FIT at 18.0 ppg EMW just for fracture gradient data acquisition purpose. 2. In page 9, step 21, ConocoPhillips apply to lower the minimum acceptable FIT to 12.5 ppg at 9-5/8" intermediate 1 liner shoe and we plan to stop FIT at 12.5 ppg EMW since this well is not a candidate well for annular disposal. 3. In page 9, step 13, ConocoPhillips apply to add NEU/DEN/NMR log in 12-1/4" intermediate 1 section, and step 22, add NEU/DEN log in pilot hole. 4. In page 9, step 15 and in page 10, step 26, ConocoPhillips apply variance to only test the changed VBR prior to casing/liner run other than full BOP test. 5. In page 9, step 10 and step 20, test casing pressure to 3,000psi other than 3,500psi. The updated predicted pore pressure is 3,350 psi which is lower than the originally predicted pore pressure and subsequently lower anticipated surface pressure. 6. Page #10 and #28, lower to mud weight for production section to 9.0 ppg due to depleted sand pore pressure. All the changes still make the well design meet the requirement/regulation of AOGCC, the primary reason for the changes is the updated lower pore pressure, which result in lower FIT/LOT requirement and lower casing testing pressure, other changes are related to added logging tool and reduced MW for production section. Please review the requested changes and let me know if you have any questions. I appreciate your prompt response as we are scheduled to spud the well in 10 days or so. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, June 15, 2017 10:29 PM To: Dai, Weifeng Subject: Re: CD5-316 (PTD #217-040) Cement Plug Follow Up Flag: Follow up Flag Status: Completed Weifeng, A tag is required on Plug #1 to prove competency. Thanx, Victoria Sent from my iPhone On Jun 15, 2017, at 3:44 PM, Dai, Weifeng<Weifene.Dai@conocophillips.com> wrote: Good afternoon Victoria, State approved CD5-316 well construction project (PTD #217-040). In the pilot hole section, we plan to spot 3 plugs (tea P&A plugs and lea kick off plug) after drilling. Plugs #1 is at bottom to isolate the potential hydrocarbon bearing zone (Kuparuk C sand), plug #2 is NOT intend to isolate any hydrocarbon bearing zone, but just comply with BLM regulation to spot plug every 3,000' in open hole, please see the well schematic below. With that being said, to improve operation efficiency, ConocoPhillips plan not to tag plug #1 and plug #2. The kick off plug will be tagged by subsequent BHA. Please reply with your approval and let me know if you have any questions or need more information. <Picture (Device Independent Bitmap) I.jpg> Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 k Schematic 20` Ma0 W*W0 COn00ator 115 P'3nred Tap N LIMr 2 00'vo'13;1 TVD C,M. ire TC iC open MWe I IL 55, 14%1�0 2^sen `nr- PY3frea TQC -7.9-a MD 4,- 2U TVA IV.: ' open Male 17 ppg Class G Cement top at s -W 400 Loo aTCdd LVwr 13.750' MD +:.9W SID t5.D-s?TV3 ;z 17 ppg Class G Cement Bottom at 14.300' MD 15.8 opig Class G Cement Top at 15.500' MD Pkv 15.8 pN Class G Cement Bottom at 02 16,000,' MD 15 8 M Class G Cement Fop at 19.000' MD Pxv i...1 ..1 +s.s±Pf31�v9 up 6,V4- Open MON THE STATE OfALASKA GOVERNOR BILI. WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Colville River Field, Alpine Oil Pool, CRU CD5-316 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-040 revised (2) Surface Location: 380' FNL, 2728' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 248' FNL, 1977' FEL, SEC. 2, TION, R3E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax 907.276.7542 www.00gcc.alaska.gov Enclosed is the approved application for permit to drill the above referenced service well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name CRU C135-316PH and API number 50-103-20756-70- 00 from records, data and logs acquired for well CRU CD5-316. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. DATED this -�L day of September, 2017. Sincerely, Hollis S. French Chair ncl V mu STATE OF ALASKA Revised AL A OIL AND GAS CONSERVATION COMMI. .JN SEP 12 2017 PERMIT TO DRILL �® 20 AAC 25.005 1a. Type of Work:1b. Proposed Well Class: Exploratory - Gas Service - WAG J Service - Disp ❑ 1c. Specify if well is proposed for: Drill D Lateral J Straligraphic Test ❑ Development - Oil ElService - Winj [_1Single Zone EZCoalbed Gas❑ Gas HydratesRedrill ❑ Reentry Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: Con000Phillips Alaska, Inc. Bond No. 59-52-180 CRU CD5-316 . 3. Address: 6. Proposed Dep V 86.6y 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 2 4 TVD: 7521 Colville River Unit Alpine Pool , 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 380' FNL 2728' FEL Sec. 18 T11 N R4E, UM ASRC.NPR4, AA092W, AAMM4,AA081817, AAo94165, AA W67 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1849' FNL 3139 FEL Sec. 26 Tt IN R3E, UM 932669, 34075a, 340757, 932552, 386806, 386808 7/15/2017 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 248' FNL 1977' FEL Sec. 2 T10N R3E, UM 15912, 1280, 3122, 2525, 5120, 2556 5031'to AA081797 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (it): 70.8 • 15. Distance to Nearest Well Open Surface: x-349250 y-5965836 Zone -4 GL Elevation above MSL (ft): 34. to Same Pool: 5,800' from CDS-314X 16. Deviated wells: Kickoff depth: 100 426 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3350 . Surface: 2606 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H40 Welded 79 36 36 115 115 10 yds. 16" 13.375" 68 L-80 H-563/BTC 2409 36 36 2445 2185 1175 sx 11.0 ppg DeepCrste, 328 sx 15.8 ppg G 12.25" 9.625" 40 L-80 BTC -M 11950 2000 1891 13950 6041 974 sx 12.2 ppg G; 217 sx 15.8 ppg G 8.75" 7.0" 26 L-80 HYD563 18753 36 36 18789 7439 173 sx 15.8 ppg G 6.125" 4.5" 12.6 L-80 TXP 10487 18600 7422 29087 7521 uncemented perf pup liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (11): Plugs (measured): Effect. Depth MD (ff): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (it): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 1] Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program E] 0 AAC 25.050 requirements Q t�2 21. Verbal Approval: Commission Representative: v7G tori -a, 40 C/Jr '%//#//-7 Dale LktAN 61 r V166 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Weifeng Da 263-4324 be deviated from without prior written approval. Contact weifengAai(ftop. corn Email Printed Name Chip Alvord Title Drilling Manager `)1 I Le Signature _ C -r _ Phone 265-6120 Date Z I/ r Commission Use Only Permit to Drill Cev%,-,e, API Number: Permit Approval See cover letter for other Number: 217-040 2, 50- 1 o3.2.a-Iri -(o(.x o o Date: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: Q� P tG.S t ,tp 35-0 O (J 5 + Samples req'd: Yes Nom Mud log req'd: Yes ❑ No �D Z5—DOP 51 Rr ve-1ar i measures: Yes No Directional re d Yes Noff--Il fri�'✓1 /7YC ✓l rn }TY �� �xS r❑r��II vY q' : Ll �y N / Vf !r %-t" VV o 1 V! r rc -I'r � Spacing exception mq'd: Yes ❑ NoIJ Inclination -only svy req'd: Yes ❑ Nom 9j n !J C✓ ,20 /} 6-C Z 57. 3 SC j -•i (2� Post initial injection MIT req'd: Yes �No❑ lO tt LU✓7CIr,ff'rylS fe7rrLnn,'nq SCn1C )CO1` l" rrvl r C4 r'i;.{-e d H t', 7 -ac c f—'v v41, n o t /'av4 a rc 4 a �d ! c- 5/09 c of cFftctigarra o F fAXVr� o P0,4r7-+ f P-utV I'&,e In f-rrva1 0 i -D IYf 'Ytp WGII . Sh/CCtlo✓7 pi�T✓ (—C ryU/�✓t Gl (J r,or fr—rJtG�-�•n cl �^ APPROVEDBY✓ q Approved by: V COMMISSIONER THE COMMISSION Date: V7 L- 9//S Submit Form and �� Form 040 (Revised 5 {�p{r toil v�lid fd24months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate �,� �� �ti3� 311 IK` I V I \7l H L CRU CD5-316(PTD 217-040) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well CRU CDS-316 with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement (and lengths) that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the a -line log does. CPAI must start the log at a depth to insure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cement job summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 September 121", 2017 Alaska Oil and Gas Conservation Commission 333 West 7' Avenue, Suite 100 Anchorage, Alaska 99501 "rz�LlftU SEP 12 2017 AOGCC ConocoPhillips Re: Application for Revise Permit to Drill CRU CD5-316 Dear Sir or Madam: ConocoPhillips Alaska, Inc. hereby applies for a Revised Permit to Drill an onshore water -alternating -gas (WAG) injection well from the CD5 drilling pad. The intended spud date for this well is July 15'", 2017. The reason for the revised part in the approved PTD (PTD # 217-040) is mainly due to the lower predicted pore pressure in prodution sand than what was stated in the approved PTD submitted a few months ago as the rig schedule change and reservoir pressure management plan. ConocoPhillips intends to extend the TD of the well to 29,087' from originally planned 27,824'. The reason for the TD extension is prepare for potential extended sand body which has happened in the offset well. 1 The rest of the well stays the same as the approved PTD. If you have any questions or require further information, please contact Weifeng Dai at 2634324 (weifena.dai(a),coo.com) or Chip Alvord at 265-6120. Sincerely, cc: CD5-316 Well File / Ann Haggerty -Sherrod ATO 1530 Johnson Njoku ATO 1720 ` 1 f l/�/ Weifeng Dai Chip Alvord Jason McLennan ATO 1570 ATO 1790 Drilling Engineer Lanston Chin Kuukpik Corp 11:34, Septemder 11 71 1 CD5-316wp16 PermitPack ii Plan Summar, r i� I I o0 0 0 20250 22500 24750 27000 29250 Measured Depth - '.. CD5-316 actual @ 70.44usft (Doyon 19) s ... o -- - - 4-1 /2 z6-1/8 __.. e 0 0 0 0 .._. 0 0 0 0 0 0 .._.. D ° _...._ 1Y279 19500 21000 22500 24000 25500192]9 - 1770 330 - 30 I9,m - teeso Horizor l Departure 9 'r i9a6° - 19850 19850 - 20W0 zao,o - 20220 - - 300 5 . 60 20220 - 2w10 n 55 ..... ...... .. 1 .__ 1 2710 - M600 20600 - 20900 20800 21200 21M 215°6 21500 - 21800 c 28 _ _. _ _ 70 90 zte60 - zm00 y 22100 M400 u U _ { 22400 - 22700 22700 -"- 23000 23000 23600 0 19050 19200 19350 19500 19650 19800 19950 20100 240 - 120 as"'° - WR00 2,200 - 24060 Measured Depth 210 150 24830 - 25400 - 26010 M a 26610 - SURVEY PR�RM Surface Location 7 North / v: East/X: oeplh From oepin To sung7nM Tool 9B 83 1076.25 CDS3165 y1-SUB GWDIFW mr188Bt1 113392 2289.67 CDS3166ny2-6LB_MWOMaMFG (D681036p9RW,'OA2 Pad EleVation: 34.00 26610 27210 2]210 - 27605 160 1307332138°73°.3W2 CD5316P915rvy1�-BMWA11BF1BMDG-G14ri1Y44'mU'ffi801� ) ]0445.7529336.00"%84-1 t 39351719278.96 CD53163rvy 4-SLB_MWO+ p68A695,D6F 1927898'20836.00 CD5atdry16(RI, CDSd16) MWo a"y9)Ie8' ]szD.a4 z9oess4 a-trz"a-tre" Magnetic Model &Date: BGGM2017 05-Sep-17 193360029088.84 CD5318wpt6 (6ig:C0S316)MWD IFR-AK-0P SC Magnetic North is 17.00° East of True North (Magnetic Declination) Magnetic Dip & Field Strength: 80.79° 57450.28nT LAhdogy CoWn Sec MD Inc ND +W-S 4El-W Oleg Trace Target Annota8on 1192]8.96 87.78 168.93 7443.59-12528.50-10550.41 0.00 0.0010564.13 Adjust TF t.W O°, for .93 .00 ".13 0°,S. 20' 219338.00 87.78 16883 7445.]5.12582.43-10539.6] 0.00 0.0010561.12 2V Stan 3TFro 319356.00 8]]8 16893 7446.52 -12602.04 -10535.63 00010581.10 Sled DLS, 65.56°TF, for 139.41' for 831 419495.41 89.51 172.74 7449.82 -12]39.7 -10513.44 3.00 65.5610720.42 Hdtl for 8310.12' 3.00 527805.53 89.51 172.74 7520.30-20382.75 -9462.67 0.00 00019020.26 CD531602.Toe W0717 VO Stan DLS, 49.15°TF, for 75.5]' for 12 627881+10 90.01 173.31 7520.62 -2105].]6 -9453.69 1.00 49.1519096.23 Hdtl for 1205.54' 7 29086.64 90.01 173.31 7520.44 -22255.09 -9313.22 0.00 0.0020299.76 CD5-316 03. Ik 091117 JC TD: 29086.64' M0, 7520.49' TVD By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured its completeness, and all surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit pack.l approve it as the basis for the final well plan and wellsite drawings. also acknowledge that unless notified otherwise all targets have a 100 feet lateral repared by hec e y ccepted by Approved by: B. Temple uy But An [Erik Sterk W. Dai C N 7 CD5-316wp16 19336.00 To 29086.64 I Spider CDS-316PB1 ---- CD5-316wp16 CD5-314X Easting (4000 usftln) CD5-315PB1 CD5-315 CD4 -26 13 \CD5-NL1 CD5-316wp16 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 0- 13 3/8" -- ®® sr °O O -4000- 4000 00 -8000- -8000 0 o -z� 2000 7" x 8-1/2" by 9-7/8" 19 20000 21000 22000 -16000 23000 24000 25000 26000 -20000 27000 CD5-316 02. Toe 090717 0 00----------------- 4-1/2" x 6-1/8"----- -- ------------ __CD5-316 C D5-31 6 03. 1k 091117 C -24000 CD5-316wP1 -20000 -16000 -12000 -800 -4000 0 4000 8000 12000 West(-)/East(+) 13 3/8" N J H 9 0° 5- 100 CD5-316wp16 9 5/8" Section View 7 x 8-1/2" by 9-7/8" CD5-316 02. Toe 04017 V CD5-316 03. 1k 091 17 8000 10000 12000 Vertical Section at 170.00 0 (2000 usftln) 18000 20000 Plan Report ConocoPhillips(Alaska) Inc. MINIS Western North Slope CD5 Alpine West Pad Rig: CD5-316 501032075600 Rig: CD5-316 Plan: CD5-316wp16 Standard Proposal Report 11 September, 2017 ConocoPhillips ConocoPhillips Database: OAKEDMP2 Company: Conoco Phillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig. CD5-316 Wellbore: Rig: CD5-316 Design: CD5-316wpl6 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig. CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) C135-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16 " Grid Convergence: -1.15, Well Rig'. CD5-316 Depth From Depth To Well Position +N/ -S 53.11 usft Northing: Latitude: Version: +E/ -W 30.52 usft Easting: Longitude: Position Uncertainty Depth From (TVD) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft 20,836.00 (usft) (usft) (usft) (°) Wellbore Rig: CD5-316 Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2017 9/5/2017 17.00 80.79 57,450.26 Design C05-316wpi6 Depth From Depth To Audit Notes: (usft) lust) Sumey(Wellbore) Version: Phase: PLAN Tie On Depth: 19,278.96 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 20,836.00 (usft) (usft) (usft) (°) 36.44 0.00 0.00 170.00 Plan Survey Tool Program Date 9/11/2017 Depth From Depth To (usft) lust) Sumey(Wellbore) Tool Name Remarks 1 13,935.17 19,278.96 CD5-316 Srvy 4-SLB_MWD+GM MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2 19,278.96 20,836.00 CD5-316wp16 (Rig'. CD5-316) MWD MWD - Standard 3 19,336.00 29,086.64 CD5-316wp16 (Rig: CD5-316) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 9/11/2017 2.24:54PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips ConocoPhillips Standard Proposal Report Database: OAKEDMP2 Local Coordinate Reference: Well Rig: C05-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Project: Western North Slope MD Reference: CO5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig'. CDS-316 Survey Calculation Method: Minimum Curvature Wellburs: Rig: CD5-316 Rate Rate Rate Design: CD5-316wpi6 (°1100usft) 0.00 0.00 0.00 Plan Sections 0.00 0.00 0.00 0.00 0.00 Measured 1.24 2.73 Vertical 0.00 0.00 Depth Inclination Azimuth Depth .N/ -S •E/ -W (usft) (•) (°) (usft) (usft) (usft) 19,278.96 87.78 168.93 7,443.54 -12,526.50 -10,550.41 19,336.00 87.78 168.93 7,445.75 -12,582.43 -10,539.47 19,356.00 87.78 168.93 7,446.52 -12,602.05 -10,535.63 19,495.41 89.51 172.74 7,449.82 -12,739.60 -10,513.44 27,805.53 89.51 172.74 7,520.30 -20,982.75 -9,462.87 27,881.10 90.01 173.31 7,520.62 -21,057.76 -9,453.69 29,086.64 90.01 173.31 7,520.44 -22,255.09 -9,313.22 Dogleg Build Turn Rate Rate Rate (°1100usft) (°1100usft) (°1100usft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1.24 2.73 0.00 0.00 0.00 1.00 0.65 0.76 0.00 0.00 0.00 TFO (°) Target 0.00 0.00 0.00 65.56 0.00 CD5-316 02, Toe 090- 49.15 0.00 CD5.31603. U0911' 9/112017 2:24:54PM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Database: Company: Project Site: Well: Wellbore: Design: Planned Survey OAKEDMP2 Con000Phillips(Alaska) Inc. -WNS Western North Slope CDs Alpine West Pad Rig: CD5-316 Rig: COS -316 CD5-316wpi6 ConocoPhillips Standard Proposal Report Local Coordinate Reference: Well Rig. CD5-316 TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) MD Reference: CDS-316 actual @ 70.44usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -NIS -E/-W Section Rate Rate Rate (usft) (1) 11 (usft) (weft) (usft) (usft) ("/100usft) (°1100usft) (`1100usft) 100.00 0.64 306.00 100.00 0.22 4.30 -0.27 0.00 0.00 200.00 0.54 239.13 199.99 0.33 -1.13 -0.52 0.66 -0.10 300.00 1.35 209.16 299.98 -0.86 -2.03 0.50 0.92 0.81 400.00 2.76 208.36 399.92 -3.95 -3.66 3.25 1.42 1.42 500.00 3.63 202.26 499.75 -9.11 -6.18 7.90 0.93 0.87 600.00 700.00 800.00 900.00 1,000.00 1,100.00 1,200.00 1,300.00 1,400.00 1,500.00 1,600.00 1,700.00 1,800.00 1,900.00 2,000.00 2,100.00 2,200.00 2,300.00 2,360.00 13 318" 2,400.00 2,500.00 2,600.00 2,700.00 2,800.00 2,900.00 3,000.00 3,100.00 3,200.00 3,300.00 3,400.00 3,500.00 3,600.00 3,700.00 3,800.00 3,900.00 4,000.00 4,100.00 4,200.00 4,300.00 4,400.00 4,500.00 4,600.00 4,700.00 4,800.00 4,900.00 5,000.00 5,100.00 4.05 200.48 599.53 -15.41 -8.57 13.68 0.43 0.42 6.33 205.20 699.12 -23.55 -12.04 21.10 2.32 2.28 8.74 217.71 798.26 -34.59 -19.01 30.76 2.91 2.42 10.78 219.91 896.82 47.67 -29.65 41.80 2.07 2.04 13.41 219.28 994.56 -63.96 -43.10 55.50 2.63 2.62 14.81 218.24 1,091.50 -83.01 -58.52 71.59 1.42 1.40 16.68 216.46 1,187.84 -104.38 -74.69 89.82 1.93 1.87 19.55 215.09 1,282.90 -129.52 -92.82 111.43 2.90 2.87 21.95 213.98 1,376.37 -158.80 -112.94 136.78 2.43 2.40 24.70 211.40 1,468.22 -192.03 -134.32 165.78 2.94 2.76 27.12 210.78 1,558.14 -229.53 -156.83 198.81 2.43 2.42 29.84 210.65 1,646.04 -270.51 -181.17 234.94 2.72 2.72 31.79 211.13 1,731.87 -314.52 -207.52 273.71 1.97 1.95 32.10 211.26 1,816.89 -359.56 -234.80 313.33 0.32 0.31 35.49 211.50 1,899.97 -407.07 -263.72 355.09 3.38 3.38 38.47 212.71 1,979.70 458.28 -295.63 399.98 3.08 2.99 40.29 215.55 2,057.01 -510.79 -331.20 445.52 2.56 1.81 42.29 217.03 2,132.13 -563.66 -370.68 490.73 2.23 2.00 42.36 217.87 2,176.50 -595.74 -395.24 518.05 0.94 0.11 42.55 218.36 2,206.03 -616.95 411.90 536.05 44.93 218.67 2,278.66 -670.60 454.86 581.43 47.65 219.21 2,347.44 -727.22 -500.26 629.30 50.12 220.03 2,413.37 -785.04 -548.31 677.90 52.88 221.14 2,475.58 -844.58 -599.13 727.71 55.33 223.49 2,534.16 -904.62 -653.55 777.39 57.67 225.25 2,589.35 -964.10 -711.98 825.82 59.89 226.40 2,641.16 -1,023.66 -773.35 873.82 62.21 226.85 2,689.58 -1,083.71 -836.98 921.91 64.29 227.55 2,734.59 -1,144.40 -902.48 970.30 67.04 229.58 2,775.76 -1,204.60 -970.87 1,017.70 69.16 229.84 2,812.88 -1,264.52 -1,041.79 1,064.40 69.91 228.95 2,647.92 -1,325.53 -1,112.85 1,112.15 71.14 228.45 2,881.29 -1,387.72 -1,183.70 1,161.09 72.01 227.61 2,912.62 -1,451.17 -1,254.35 1,211.31 72.09 226.43 2,943.52 -1,515.99 -1,323.95 1,263.06 72.42 225.04 2,974.01 -1,582.41 -1,392.19 1,316.62 72.57 223.76 3,003.99 -1,650.65 -1,458.86 1,372.25 72.63 223.18 3,033.94 -1,720.00 -1,524.39 1,429.16 72.59 223.21 3,063.77 -1,789.64 -1,589.66 1,486.41 72.55 223.61 3,093.76 -1,858.97 -1,655.18 1,543.31 72.58 224.14 3,123.72 -1,927.76 -1,721.30 1,599.57 72.58 223.72 3,153.66 -1,996.37 -1,787.60 1,655.63 72.60 224.38 3,183.58 -2,065.05 -1,853.84 1,711.76 72.06 224.13 3,213.91 -2,133.27 -1,920.37 1,767.39 71.59 224.53 3,245.12 -2,201.24 -1,986.75 1,822.80 71.53 225.28 3,276.75 -2,268.39 -2,053.75 1,877.29 71.54 225.50 3,308.43 -2,335.01 -2,121.26 1,931.18 0.00 -66.87 -29.96 -0.80 -6.10 -1.77 4.71 12.51 2.20 -0.63 -1.04 -1.77 -1.37 -1.11 -2.58 -0.62 -0.13 0.48 0.13 0.24 1.22 2.84 1.48 1.39 0.96 0.48 1.24 2.39 2.38 0.30 2.75 2.72 0.54 2.54 2.46 0.82 2.90 2.76 1.11 3.10 2.45 2.35 2.76 2.34 1.75 2.43 2.22 1.15 2.35 2.32 0.45 2.17 2.06 0.70 3.32 2.76 2.03 2.13 2.11 0.26 1.12 0.75 -0.89 1.32 1.23 -0.51 1.17 0.86 -0.84 1.12 0.08 -1.17 1.37 0.33 -1.40 1.23 0.15 -1.28 0.56 0.06 -0.58 0.06 -0.04 0.04 0.38 -0.03 0.39 0.51 0.02 0.53 0.40 0.00 -0.42 O.63 0.02 0.66 0.58 -0.53 -0.24 0.61 -0.48 0.40 0.71 -0.06 0.75 0.21 0.01 0.22 9/11/2017 2.24:54PM Page 4 COMPASS 5000.14 Build 65 lw ConocoPhillips ConocoPhillips Standard Proposal Report Database: OAKEDMP2 Local Coordinate Reference: Well Rig'. CD5-316 Company: ConowPhillips(Alaska) Inc. -WNS TVD Reference: C05-316 actual @ 70.44usft (Doyon 19) Project: Western North Slope MO Reference: CD5-316 actual @ 70.44us%(Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig. CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Rig'. CDS-316 Azimuth Depth Design: CD5-316wp16 Section Rate Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -NIS +EI -W Section Rate Rate Rate (usft) V) (1) (usft) (usft) (usft) (usft) (°HOOusft) (01100usft) ("11001,sft) 5,300.00 71.56 226.29 3,371.70 -2,466.90 -2,257.65 2,037.38 0.34 0.00 0.36 5,400.00 71.54 225.78 3,403.37 -2,532.75 -2,325.93 2,090.38 0.48 -0.02 -0.51 5,500.00 71.56 225.50 3,435.01 -2,599.15 -2,393.68 2,144.00 0.27 0.02 -0.29 5,600.00 71.56 225.38 3,466.64 -2,665.66 -2,461.32 2,197.76 0.11 0.00 -0.11 5,700.00 71.57 225.21 3,498.27 -2,732.43 -2,528.71 2,251.81 0.17 0.01 -0.17 5,800.00 71.55 225.47 3,529.89 -2,799.19 -2,596.11 2,305.86 0.25 -0.02 0.26 5,900.00 71.51 225.44 3,561.58 -2,865.60 -2,663.83 2,359.50 0.05 -0.04 -0.04 6,000.00 71.55 225.67 3,593.28 -2,932.13 -2,731.41 2,413.28 0.22 0.04 0.23 6,100.00 71.56 225.03 3,624.90 -2,998.62 -2,799.08 2,467.01 0.61 0.01 -0.64 6,200.00 71.53 224.80 3,656.55 -3,065.90 -2,865.95 2,521,66 0.22 -0.03 -0.23 6,300.00 71.56 224.29 3,688.21 -3,133.46 -2,932.53 2,576.63 0.48 0.02 -0.51 6,400.00 71.63 224.68 3,719.79 -3,201.21 -2,998.97 2,63181 0.37 0.07 0.39 6,500.00 71.41 224.48 3,751.50 -3,268.76 -3,065.54 2,686.77 0.29 -0.22 -0.20 6,600.00 71.58 224.91 3,783.24 -3,336.17 -3,132.23 2,741.58 0.43 0.16 0.42 6,700.00 71.50 225.19 3,814.92 -3,403.12 -3,199.43 2,795.84 0.28 -0.07 0.29 6,800.00 71.44 224.81 3,846.71 -3,470.18 -3,266.45 2,850.25 0.36 -0.06 -0.38 6,900.00 71.46 224.80 3,878.53 -3,537.50 -3,333.19 2,904.96 0.02 0.02 -0.01 7,000.00 71.51 225.08 3,910.26 -3,604.57 -3,400.23 2,959.37 0.27 0.05 0.28 7,100.00 71.49 225.08 3,942.01 -3,671.53 -3,467.38 3,013.64 0.02 -0.02 0.00 7,200.00 71.45 225.06 3,973.79 -3,738.49 -3,534.51 3,067.93 0.05 -0.04 -0.02 7,300.00 71.73 225.27 4,005.51 -3,805.42 -3,601.69 3,122.18 0.35 0.28 0.21 7,400.00 72.00 224.87 4,036.50 -3,872.34 -3,669.24 3,176.35 0.46 0.27 -0.40 7,500.00 71.97 224.54 4,067.43 -3,940.10 -3,735.96 3,231.50 0.31 -0.03 -0.33 7,600.00 71.98 224.81 4,098.38 -4,007.73 -3,802.60 3,286.50 0.25 0.01 0.26 7,700.00 71.99 224.95 4,129.30 -0,075.10 -3,869.93 3,341.16 0.14 0.01 0.14 7,800.00 72.01 225.53 4,160.21 -4,142.12 -3,937.40 3,395.47 0.55 0.02 0.57 7,900.00 72.02 226.52 4,191.09 -4,208.19 -4,005.82 3,448.65 0.94 0.01 0.99 8,000.00 71.98 225.93 4,221.99 -0,273.91 -4,074.56 3,501.44 0.56 -0.04 -0.59 8,100.00 71.82 225.56 4,253.05 -0,340.25 4,142.64 3,554.95 0.38 -0.16 -0.37 8,200.00 71.52 225.35 4,284.52 -4,406.85 4,210.27 3,608.60 0.36 -0.31 -0.21 8,300.00 71.49 225.65 4,316.23 4,473.40 4,277.83 3,662.60 0.26 -0.02 0.30 8,400.00 71.46 226.74 4,348.00 4,539.03 4,346.27 3,715.35 1.03 -0.03 1.09 8,500.00 71.43 227.37 4,379.82 4,603.46 4,415.81 3,766.72 0.61 -0.03 0.64 8,600.00 71.49 227.11 4,411.66 4,667.84 -4,485.39 3,818.04 0.26 0.06 -0.27 8,700.00 71.60 226.43 4,443.26 4,732.63 -4,554.70 3,869.82 0.66 0.12 -0.68 8,800.00 71.52 225.34 4,474.88 4,798.81 4,622.67 3,923.19 1.03 -0.06 -1.08 6,900.00 71.44 224.88 4,506.65 4,865.75 4,689.82 3,977.45 0.45 -0.08 -0.47 9,000.00 71.45 224.81 4,538.50 4,933.04 4,756.59 4,032.13 0.06 0.01 -0.07 9,100.00 71.47 225.40 4,570.27 -5,000.05 4,823.67 4,086.47 0.56 0.02 0.59 9,200.00 71.52 226.05 4,602.03 -5,066.22 4,891.59 4,139.84 0.62 0.05 0.65 9,300.00 71.49 226.58 4,633.73 -5,131.72 4,960.18 4,192.43 0.51 -0.03 0.53 9,400.00 71.53 227.11 4,665.47 -5,196.58 -5,029.36 4,244.29 0.51 0.04 0.53 9,500.00 71.54 226.45 4,697.13 -5,261.42 -5,098.60 4,296.12 0.63 0.01 -0.67 9,600.00 71.47 226.06 4,728.85 -5,327.02 -5,167.08 4,348.84 0.37 -0.07 -0.38 9,700.00 71.53 225.46 4,760.58 -5,393.17 -5,235.03 4,402.18 0.57 0.06 -0.60 9,800.00 71.51 224.98 4,792.28 -5,459.99 -5,302.34 4,456.30 0.46 -0.02 -0.48 9,900.00 71.50 224.82 4,823.99 -5,527.17 -5,369.29 4,510.83 0.15 -0.01 -0.16 10,000.00 71.48 224.88 4,855.75 -5,594.49 -5,436.06 4,565.53 0.06 -0.02 0.06 10,100.00 71.52 225.56 4,887.45 -5,661.17 -5,503.51 4,619.49 0.64 0.04 0.68 10,200.00 71.50 225.35 4,919.18 -5,727.69 -5,571.09 4,673.26 0.19 -0.02 -0.20 10,300.00 71.54 224.69 4,950.87 -5,794.56 -5,638.36 4,727.43 0.63 0.04 -0.66 10,400.00 71.52 223.48 4,982.54 -5,862.75 -5,704.28 4,783.15 1.15 -0.01 -1.22 10,500.00 71.47 223.19 5,014.26 -5,931.92 -5,769.16 4,840.00 0.28 -0.05 -0.29 10600.00 71.44 223.11 5,046.08 -6,000.98 -5,834.11 4,896.73 0.09 -0.03 9/112017 2:24:54PM Page 5 COMPASS 500014 Build 85 Conocc ijlips ConocoPhillips Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Rig. CD5-316 Company: ConowPhillips(Alaska) Inc. -WNS TVD Reference: CD5-316 actual @ 71 (Doyon 19) Project Western North Slope MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-316 Survey Calculation Method: Minimum Curvature Weliboro: Rig: CD5-316 Azimuth Depth Design: CD5-316wpl6 Section Rate Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -NIS +E/ -W Section Rate Rate Rate (usft) (`) (1) (usft) (usft) (usft) (usft) ('I100usft) ('1100usft) ('/100usft) 10,700.00 71.51 223.25 5,077.88 -6,070.24 -5,898.86 4,953.69 0.15 0.07 0.14 10,800.00 71.49 223.48 5,109.58 -6,139.15 -5,964.02 5,010.24 0.22 -0.02 0.23 10,900.00 71.50 224.18 5,141.34 -6,207.64 -6,029.60 5,066.30 0.67 0.01 0.70 11,000.00 71.56 224.97 5,173.02 -6,275.19 -6,096.18 5,121.26 0.75 0.06 0.79 11,100.00 71.54 225.21 5,204.65 -6,342.11 -6,163.42 5,175.49 0.23 -0.02 0.24 11,200.00 71.51 225.95 5,236.34 -6,408.53 -6,231.12 5,229.15 0.69 -0.03 0.73 11,300.00 71.51 225.56 5,268.05 -6,474.69 -6,299.07 5,282.50 0.37 0.00 -0.39 11,400.00 71.48 226.39 5,299.80 5,540.58 -6,367.27 5,335.55 0.79 -0.03 0.83 11,500.00 71.56 226.65 5,331.49 5,605.73 5,436.20 5,387.74 0.27 0.08 0.27 11,600.00 71.52 225.77 5,363.17 -6,671.50 5,504.54 5,440.64 0.64 -0.05 -0.89 11,700.00 71.52 226.02 5,394.85 -6,737.48 -6,572.68 5,493.79 0.24 0.00 0.25 11,800.00 71.48 226.13 5,426.62 5,803.29 -6,640.95 5,546.74 0.11 -0.04 0.11 11,900.00 71.53 226.07 5,456.32 5,868.92 -6,709.41 5,599.49 0.08 0.05 -0.07 12,000.00 71.53 225.88 5,490.01 5,935.01 -6,777.44 5,652.76 0.18 0.00 -0.19 12,100.00 71.55 226.01 5,521.66 -7,000.85 -6,845.72 5,705.75 0.13 0.02 0.13 12200.00 71.53 225.58 5,553.32 -7,066.94 -6,913.77 5,759.01 0.41 -0.02 -0.43 12,300.00 71.55 225.38 5,584.99 -7,133.54 -6,981.31 5,812.87 0.19 0.02 -0.20 12,400.00 71.56 225.31 5,616.61 -7,200.16 -7,048.83 5,866.78 0.07 0.01 -0.07 12,500.00 71.49 224.43 5,648.28 -7,267.27 -7,115.87 5,921.21 0.64 -0.07 -0.89 12,600.00 71.50 224.04 5,680.04 -7,335.32 -7,161.91 5,976.76 0.36 0.01 -0.38 12,700.00 71.54 224.29 5,711.74 -7,403.40 -7,247.95 6,032.33 0.24 0.03 0.25 12,800.00 71.64 224.34 5,743.33 -7,471.26 -7,314.25 6,087.65 0.12 0.11 0.05 12,900.00 72.04 224.83 5,774.51 -7,538.95 -7,380.93 6,142.73 0.62 0.40 0.49 13,000.00 71.98 224.43 5,805.38 -7,606.65 -7,447.74 6,197.80 0.39 -0.06 -0.41 13,100.00 71.98 224.77 5,836.31 -7,674.34 -7,514.54 6,252.86 0.33 0.00 0.34 13,200.00 71.93 224.62 5,867.29 -7,741.95 -7,581.39 6,307.84 0.16 -0.06 -0.15 13,300.00 71.93 224.86 5,898.34 -7,809.53 -7,648.24 6,362.78 0.23 0.01 0.24 13,400.00 71.89 225.42 5,929.27 -7,876.53 -7,715.72 6,417.04 0.53 -0.04 0.56 13,500.00 71.50 225.93 5,960.76 -7,943.03 -7,783.43 6,470.78 0.62 -0.39 0.51 13,600.00 71.49 226.67 5,992.51 -8,008.25 -7,852.27 6,523.06 0.70 -0.01 0.74 13,700.00 71.46 226.71 6,024.28 -8,073.51 -7,921.06 6,575.38 0.05 -0.03 0.04 13,800.00 71.44 226.74 6,056.09 -8,138.25 -7,990.32 6,627.11 0.04 -0.02 0.04 13,838.00 71.58 227.62 6,068.14 -8,162.75 5,016.75 6,646.65 2.20 0.37 2.29 9 5/8.. 13,900.00 71.57 228.17 6,087.66 -8,202.01 -8,060.56 6,677.70 0.65 -0.01 0.90 14,000.00 71.78 227.10 6,119.32 -8,265.92 -8,130.66 6,728.46 1.04 0.20 -1.07 14,100.00 69.68 225.50 6,151.72 -8,331.19 -8,199.15 6,780.85 2.58 -2.09 -1.60 14,200.00 66.80 224.87 6,186.82 -8,396.78 -8,264.87 6,834.04 2.94 -2.88 -0.63 14,300.00 66.58 225.10 6,226.75 -8,461.68 -8,329.63 6,686.70 0.31 -0.22 0.23 14,400.00 67.58 224.45 6,267.76 -8,526.98 -8,394.54 6,939.74 1.17 1.00 -0.65 14,500.00 68.93 223.70 6,304.81 5,593.70 -8,459.15 6,994.23 1.52 1.35 -0.75 14,600.00 70.31 222.16 6,339.63 5,662.37 -8,522.96 7,050.77 2.00 1.38 -1.54 14,700.00 71.43 221.38 6,372.37 -8,732.85 -8,585.89 7,109.25 1.34 1.12 -0.78 14,800.00 72.26 220.41 6,403.49 5,804.59 -8,648.21 7,169.08 1.24 0.83 -0.96 14,900.00 72.77 218.47 6,433.49 -8,878.25 -8,708.82 7,231.10 1.92 0.51 -1.94 15,000.00 73.10 216.84 6,462.85 -8,954.08 -8,767.03 7,295.67 1.59 0.33 -1.62 15,100.00 73.33 216.62 6,491.63 -9,030.96 -8,824.13 7,361.46 0.31 0.23 -0.23 15,200.00 73.18 216.52 6,520.40 -9,107.70 -8,881.43 7,427.09 0.18 -0.15 -0.10 15,300.00 73.15 215.81 6,549.46 -9,185.02 -8,937.79 7,493.44 0.68 -0.03 -0.71 15,400.00 73.21 215.55 6,578.32 -9,262.83 -8,993.58 7,580.39 0.25 0.06 -0.26 15,500.00 73.17 215.85 6,607.26 -9,340.65 -9,049.32 7,627.34 0.30 -0.04 0.31 15,600.00 73.43 216.70 6,636.07 -9,417.89 -9,105.92 7,693.58 0.85 0.26 0.84 15,700.00 73.70 217.34 6,664.32 -9,494.43 -9,163.75 7,758.92 0.68 0.27 0.65 15,800.00 73.74 217.69 6,692.32 -9,570.55 -9222.24 7,823.73 0.34 0.04 0.35 9/112017 2:24:54PM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Database: OAKEDMP2 Company: ConocoPhillips(Alaska) Inc.-WNS Project: Western North Slope She: CD5 Alpine West Pad Well: Rig: CDS-316 Wellbore: Rig: CD5-316 Design: CD5-316wp16 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig'. CD5-316 CD5-316 actual @ 70 44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -N/-S +E/ -W Section Rate Rate Rate (usft) (^) (°) (usft) (usft) (usft) (usft) (°1100usft) ("1100usft) (°NOOusft) 15,900.00 73.79 217.28 6,720.28 -9,646.68 -9,280.74 7,888.54 0.42 0.05 -0.44 16,000.00 73.71 217.40 6,748.25 -9,723.07 -9,338.90 7,953.67 0.16 -0.09 0.14 16,100.00 73.87 218.10 6,776.19 -9,799.00 -9,397.66 8,018.25 0.69 0.16 0.70 16,200.00 73.29 219.28 5,8D4.47 -9,873.85 -9,457.64 8,081.54 1.27 -0.58 1.17 16,300.00 73.22 219.43 6,833.31 -9,947.88 -9,518.37 8,143.90 0.16 -0.07 0.16 16,400.00 73.38 219.43 6,862.03 -10,021.84 -9,579.24 8,206.17 0.16 0.16 0.00 16,500.00 73.32 219.36 6,890.63 -10,095.97 -9,639.96 8,268.62 0.10 -0.06 -0.07 16,600.00 73.09 219.53 6,919.59 -10,169.75 -9,700.94 8,330.70 0.28 -0.23 0.17 16,700.00 73.21 218.85 6,948.63 -10,243.95 -9,761.36 6,393.27 0.66 0.12 -0.68 16,800.00 73.32 218.41 6,977.33 -10,318.80 -9,821.14 8,456.61 0.44 0.11 -0.44 16,900.00 73.28 218.15 7,006.12 -10,394.00 -9,880.43 8,520.37 0.25 -0.05 -0.25 17,000.00 73.07 217.97 7,034.94 -10,469.39 -9,939.48 8,584.36 0.27 -0.21 -0.18 17,100.00 73.06 217.75 7,064.24 -10,544.87 -9,998.16 8,648.51 0.21 -0.01 -0.22 17,200.00 73.04 217.44 7,093.29 -10,620.87 -10,056.56 8,713.01 0.30 -0.02 -0.31 17,300.00 73.06 216.57 7,122.52 -10,696.95 -10,114.24 8,778.12 0.83 0.02 -0.87 17,400.00 73.66 214.97 7,151.26 -10,774.60 -10,170.31 8,844.85 1.64 0.61 -1.60 17,500.00 74.30 213.90 7,178.62 -10,853.95 -10,224.56 8,913.57 1.21 0.64 -1.08 17,600.00 74.79 211.80 7,205.46 -10,934.83 -10,276.98 8,984.12 2.08 0.49 -2.10 17,700.00 75.02 210.03 7,231 AS -11,017.69 -10,326.54 9,057.12 1.73 0.23 -1.77 17,800.00 76.47 207.22 7,256.14 A1,102.74 -10,372.98 9,132.81 3.09 1.45 -2.81 17,900.00 77.01 205.09 7,279.03 -11,190.10 -10,415.90 9,211.40 2.14 0.53 -2.13 18,000.00 76.86 202.40 7,301.77 -11,279.19 -10,455.20 9,292.31 2.62 -0.15 -2.68 18,100.00 78.03 198.82 7,323.62 -11,370.52 -10,489.52 9,376.29 3.70 1.18 -3.59 18,200.00 79.85 195.71 7,342.76 -11,464.30 -10,518.43 9,463.63 3.55 1.82 -3.11 18,300.00 80.96 193.13 7,359.08 -11,559.77 -10,543.28 9,553.33 2.77 1.11 -2.57 18,400.00 81.29 189.91 7,374.81 -11,656.58 -10,562.71 9,645.29 3.20 0.33 -3.22 18,500.00 82.59 187.48 7,388.82 -11,754.43 -10,577.77 9,739.04 2.74 1.30 -2.43 18,600.00 83.73 185.28 7,400.67 -11,853.13 -10,586.56 9,834.37 2.47 1.15 -2.20 18,700.00 84.48 182.98 7,410.83 -11,952.33 -10,596.00 9,930.77 2.40 0.74 -2.30 18,800.00 85.79 180.55 7,419.61 -12,051.89 -10,598.90 10,028.31 2.76 1.32 -2.43 18,900.00 87.20 178.66 7,425.56 -12,151.70 -10,598.15 10,126.74 2.35 1.41 -1.89 19,000.00 87.37 175.76 7,430.04 -12,251.48 -10,593.59 10,225.80 2.90 0.16 -2.90 19,100.00 87.11 172.07 7,434.86 -12,350.79 -10,583.07 10325.43 3.70 -0.26 -3.69 19,200.00 87.11 168.52 7,439.95 -12,449.21 -10,566.19 10,425.28 3.54 0.00 -3.55 19,278.96 87.78 168.93 7,443.54 -12,526.50 -10,550.41 10,504.13 0.99 0.65 0.52 19,300.00 87.78 168.93 7,444.35 -12,547.13 -10,546.38 10,525.15 0.00 0.00 0.00 19,336.011 67.78 168.93 7,445.75 -12,582.43 -10,539.47 10,561.12 0.00 0.00 0.00 7' x 8-112' by 9-7/8" 19,356.00 87.78 168.93 7,446.52 -12,602.05 -10,535.63 10,581.10 0.00 0.00 0.00 19,400.00 88.33 170.13 7,448.02 -12,645.29 -10,527.64 10,625.07 3.00 1.24 2.73 19,495.41 89.51 172.74 7,449.82 -12,739.60 -10,513.44 10,720.42 3.00 1.24 2.73 19,500.00 89.51 172.74 7,449.85 -12,744.16 -10,512.86 10,725.01 0.00 0.00 0.00 19,600.00 89.51 172.74 7,450.70 -12,843.35 -10,500.21 10,824.89 0.00 0.00 0.00 19,700.00 89.51 172.74 7,451.55 -12,942.55 -10,487.57 10,924.77 0.00 0.00 0.00 19,800.00 89.51 172.74 7,452.40 -13,041.74 -10,474.93 11,024.66 0.00 0.00 0.00 19,900.00 89.51 172.74 7,453.25 -13,140.94 -10,462.29 11,124.54 0.00 0.00 0.00 20,000.00 11 172.74 7,454.10 -13,240.13 -10,449.65 11,224.42 0.00 0.00 0.00 20,100.00 89.51 172.74 7,454.94 -13,339.32 -10,437.00 11,324.30 0.00 0.00 0.00 20,200.00 89.51 172.74 7,455.79 -13,438.52 -10,424.38 11,424.19 0.00 0.00 0.00 20,300.00 89.51 172.74 7,456.64 -13,537.71 -10,411.72 11,524.07 0.00 0.00 0.00 20,400.00 89.51 172.74 7,457.49 -13,636.91 -10,399.08 11,623.95 0.00 0.00 0.00 20,500.00 89.51 172.74 7,458.34 -13,736.10 -10,386.44 11,723.83 0.00 0.00 0.00 20,600.00 89.51 172.74 7,459.18 -13,835.29 -10,373.79 11,823.71 0.00 0.00 0.00 9/112017 2:24:54PM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips ConocoPhillips Standard Proposal Report Database: OAKEDMP2 Local Co-ordinate Reference: Well Rig: CD5-316 Company: ConomPhillips(Alaska) Inc. -WNS TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Project: Western North Slope MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Rig: CD5-316 172.74 7,461.73 Design: CD5-316wpl6 12,123.36 0.00 Planned Survey 0.00 21,000.00 89.51 Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -NIS +El -W Section Rate Rate Rale (usft) (°) (°) (usft) (usft) (usft) (usft) ('1100usft) ('1100usft) ('1100usft) 20,700.00 89.51 17274 7,460.03 -13,934.49 -10,361.15 11,923.60 0.00 0.00 0.00 20,800.00 89.51 172.74 7,460.88 -14,033.68 -10,348.51 12,023.48 0.00 0.00 0.00 20,900.00 89.51 172.74 7,461.73 -14,132.88 -10,335.87 12,123.36 0.00 0.00 0.00 21,000.00 89.51 172.74 7,462.58 -14,232.07 -10,323.23 12,223.24 0.00 0.00 0.00 21,100.00 89.51 172.74 7,463.43 -14,331.26 -10,310.58 12,323.13 0.00 0.00 0.00 21,200.00 89.51 172.74 7,464.27 -14,430.46 -10,297.94 12,423.01 0.00 0.00 0.00 21,300.00 89.51 172.74 7,465.12 -14,529.65 -10,285.30 12,522.89 0.00 0.00 0.00 21,400.00 89.51 172.74 7,465.97 -14,628.85 -10,272.66 12,622.77 0.00 0.00 0.00 21,500.00 89.51 172.74 7,466.82 -14,728.04 -10,260.02 12,722.66 0.00 0.00 0.00 21,600.00 89.51 172.74 7,467.67 -14,827.23 -10,247.37 12,822.54 0.00 0.00 0.00 21,700.00 89.51 172.74 7,468.51 -14,926.43 -10,234.73 12,922.42 0.00 0.00 0.00 21,800.00 89.51 172.74 7,469.36 -15,025.62 -10,222.09 13,022.30 0.00 0.00 0.00 21,900.00 89.51 172.74 7,470.21 -15,124.82 -10,209.45 13,122.18 0.00 0.00 0.00 22,000.00 69.51 172.74 7,471.06 -15,224.01 -10,196.81 13,222.07 0.00 0.00 0.00 22,100.00 69.51 172.74 7,471.91 -15,323.20 -10,164.16 13,321.95 0.00 0.00 0.00 22,200.00 89.51 172.74 7,472.76 -15,422.40 -10,171.52 13,421.83 0.00 0.00 0.00 22,300.00 89.51 172.74 7,473.60 -15,521.59 -10,158.88 13,521.71 0.00 0.00 0.00 22,400.00 89.51 172.74 7,474.45 -15,620.79 -10,146.24 13,621.60 0.00 0.00 0.00 22,500.00 89.51 172.74 7,475.30 -15,719.98 -10,133.60 13,721.48 0.00 0.00 0.00 22,600.00 89.51 172.74 7,476.15 -15,819.18 -10,120.95 13,821.36 0.00 0.00 0.00 22,700.00 89.51 172.74 7,477.00 -15,918.37 -10,108.31 13,921.24 0.00 0.00 0.00 22,800.00 89.51 172.74 7,477.84 -16,017.56 -10,095.67 14,021.13 0.00 0.00 0.00 22,900.00 69.51 172.74 7,478.69 -16,116.76 -10,083.03 14,121.01 0.00 0.00 0.00 23,000.00 89.51 172.74 7,479.54 -16,215.95 -10,070.39 14,220.89 0.00 0.00 0.00 23,100.00 89.51 172.74 7,480.39 -16,315.15 -10,057.74 14,320.77 0.00 0.00 0.00 23,200.00 89.51 172.74 7,481.24 -16,414.34 -10,045.10 14,420.66 0.00 ool) 0.00 23,300.00 89.51 172.74 7,482.09 -16,513.53 -10,032.46 14,520.54 0.00 0.00 0.00 23,400.00 89.51 172.74 7,482.93 -16,612.73 -10,019.82 14,620.42 0.00 0.00 0.00 23,500.00 89.51 172.74 7,483.78 -16,711.92 -10,007.18 14,720.30 0.00 0.00 0.00 23,600.00 89.51 172.74 7,484.63 -16,811.12 -9,994.53 14,820.18 0.00 0.00 0.00 23,700.00 89.51 172.74 7,485.48 -16,910.31 -9,981.89 14,920.07 0.00 0.00 0.00 23,800.00 89.51 172.74 7,486.33 -17,009.50 -9,969.25 15,019.95 0.00 0.00 0.00 23,900.00 89.51 172.74 7,487.17 -17,108.70 -9,956.61 15,118.83 0.00 0.00 0.00 24,000.00 89.51 172.74 7,488.02 -17,207.89 -9,943.97 15,219.71 0.00 0.00 0.00 24,100.00 89.51 172.74 7,488.87 -17,307.09 -9,931.32 15,319.60 0.00 0.00 0.00 24,200.00 89.51 172.74 7,489.72 -17,406.28 -9,918.68 15,419.48 0.00 0.00 0.00 24,300.00 89.51 172.74 7,490.57 -17,505.47 -9,906.04 15,519.36 0.00 0.00 0.00 24,400.00 89.51 172.74 7,491.42 -17,604.67 -9,893.40 15,619.24 0.00 0.00 0.00 24,500.00 89.51 172.74 7,492.26 -17,703.86 -9,880.76 15,719.13 0.00 0.00 0.00 24,600.00 89.51 172.74 7,493.11 -17,803.06 -9,868.11 15,819.01 0.00 0.00 0.00 24,700.00 69.51 172.74 7,493.96 -17,902.25 -9,855.47 15,916.89 0.00 0.00 0.00 24,800.00 89.51 172.74 7,494.81 -18,001.44 -9,842.83 16,018.77 0.00 0.00 0.00 24,900.00 89.51 172.74 7,495.66 -18,100.64 -9,830.19 16,118.65 0.00 0.00 0.00 25,000.00 89.51 172.74 7,496.50 -18,199.83 -9,817.55 16,218.54 0.00 0.00 0.00 25,100.00 89.51 172.74 7,497.35 -18,299.03 -9,804.90 16,318.42 0.00 0.00 0.00 25,200.00 89.51 172.74 7,498.20 -18,398.22 -9,792.26 16,418.30 0.00 0.00 0.00 25,300.00 89.51 172.74 7,499.05 -18,497.41 -9,779.62 16,518.18 0.00 0.00 0.00 25,400.00 89.51 172.74 7,499.90 -16,596.61 -9,766.98 16,618.07 0.00 0.00 0.00 25,500.00 89.51 172.74 7,500.75 -18,695.80 -9,754.34 16,717.95 0.00 0.00 0.00 25,600.00 89.51 172.74 7,501.59 -18,795.00 -9,741.69 16,817.83 0.00 0.00 0.00 25,700.00 89.51 172.74 7,502.44 -18,894.19 -9,729.05 16,917.71 0.00 0.00 0.00 25,800.00 89.51 172.74 7,503.29 -18,993.38 -9,716.41 17,017.60 0.00 0.00 0.00 25,900.00 89.51 172.74 7,504.14 -19,092.58 -9,703.77 17,117.48 0.00 0.00 0.00 L 26,000o0 89.51 172.74 7 504.99 -19,191,77 -9.691,13 17,217.36 0.00 0.00 0.00 9/1112017 2'24: 54PM Page 8 COMPASS 5000.14 Build 85 ConocoPhillips Database: OAKEDMP2 Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CDS Alpine West Pad North Reference: Well: Rig. CD5-316 Survey Calculation Method: Wellbore: Rig: CD5-316 Rate Design: CD5-316wpl6 (usft) Planned Survey ConocoPhillips Standard Proposal Report Well Rig'. CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/ -S +E/ -W Section Rate Rate Rate (usft) (I V) (usft) (usft) (waft) (usft) ("/t00usft) (°11o0usft) (°1100usft) 26,100.00 89.51 172.74 7,505.83 -19,290.97 -9,678.48 17,317.24 0.00 0.00 0.00 26,200.00 89.51 172.74 7,506.68 -19,390.16 -9,665.84 17,417.13 0.00 0.00 0.00 26,300.00 89.51 172.74 7,507.53 -19,489.36 -9,653.20 17,517.01 0.00 0.00 0.00 26,400.00 89.51 172.74 7,508.38 -19,588.55 -9,640.56 17,616.89 0.00 0.00 0.00 26,500.00 89.51 172.74 7,509.23 -19,687.74 -9,627.92 17,716.77 0.00 0.00 0.00 26,600.00 89.51 172.74 7,510.08 -19,786.94 -9,615.27 17,816.65 0.00 0.00 0.00 26,700.00 89.51 172.74 7,510.92 -19,886.13 -9,602.63 17,1111 0.00 0.00 0.00 26,600.00 89.51 172.74 7,511.77 -19,985.33 -9,589.99 18,016.42 0.00 0.00 0.00 26,900.00 89.51 172.74 7,512.62 -20,084.52 -9,577.35 18,116.30 0.00 0.00 0.00 27,000.00 89.51 172.74 7,513.47 -20,183.71 -9,564.71 18,216.18 0.00 0.00 0.00 27,100.00 89.51 172.74 7,514.32 -20,282.91 -9,552.06 18,316.07 0.00 0.00 0.00 27,200.00 69.51 172.74 7,515.16 -20,382.10 -9,539.42 18,415.95 0.00 0.00 0.00 27,300.00 89.51 172.74 7,516.01 -20,481.30 -9,526.78 18,515.83 0.00 0.00 0.00 27,400.00 89.51 172.74 7,516.86 -20,580.49 -9,514.14 18,615.71 0.00 0.00 0.00 27,500.00 89.51 172.74 7,517.71 -20,679.68 -9,501.50 18,715.60 0.00 0.00 0.00 27,600.00 89.51 172.74 7,518.56 -20,778.88 -9,488.85 18,815.48 0.00 0.00 0.00 27,700.00 89.51 172.74 7,519.41 -20,878.07 -9,476.21 18,915.36 0.00 0.00 0.00 27,800.00 89.51 172.74 7,520.25 -20,977.27 -9,463.57 19,015.24 0.00 0.00 0.00 27,805.53 89.51 172.74 7,520.30 -20,982.75 -9,462.87 19,020.76 0.00 0.00 0.00 27,881.10 90.01 173.31 7,520.62 -21,057.76 -9,453.69 19,096.23 1.00 0.65 0.76 27,900.00 90.01 173.31 7,520.61 -21,076.53 -9,451.49 19,115.10 0.00 0.00 0.00 28,000.00 90.01 173.31 7,520.60 -21,175.85 -9,439.84 19,214.93 0.00 0.00 0.00 28,100.00 90.01 173.31 7,520.58 -21,275.17 -9,428.18 19,314.76 0.00 0.00 0.00 28,200.00 90.01 173.31 7,520.57 -21,374.49 -9,416.53 19,414.60 0.00 000 0.00 28,300.00 90.01 173.31 7,520.55 -21,473.81 -9,404.88 19,514.43 0.00 0.00 0.00 28,400.00 90.01 173.31 7,520.54 -21,573.13 -9,393.23 19,614.26 0.00 0.00 0.00 28,500.00 90.01 173.31 7,520.53 -21,672.44 -9,381.58 19,714.10 0.00 0.00 0.00 28,600.00 90.01 173.31 7,520.51 -21,771.76 -9,369.92 19,813.93 0.00 0.00 0.00 26,700.00 90.01 173.31 7,520.50 -21,871.08 -9,358.27 19,913.76 0.00 0.00 0.00 28,800.00 90.01 173.31 7,520.48 -21,970.40 -9,346.62 20,013.60 0.00 0.00 0.00 28,900.00 90.01 173.31 7,520.47 -22,06972 -9,334.97 20,113.43 0.00 0.00 0.00 29,000.00 90.01 173.31 7,520.45 -22,169.04 -9,323.32 20,213.26 0.00 0.00 0.00 29,086.64 90.01 173.31 7,520.44 -2225509 -9,313.22 20,299.76 0.00 0.00 0.00 Design Targets Target Name -hitimiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (1) V) (usft) (usft) (usft) (usft) (usft) Latitude Longitude CD5-316 02. Toe 09071 0.00 0.00 7,520.30 -20,982.75 -9,462.87 5,944,794.00 1,479,401 00 70° 15'21 .870 N 151° 18' 5.053 W - plan hits target center - Circle (radius 100.00) CD5-316 03. 1k 091117 0.00 0.00 7,520.44 -22,255.09 -9,313.22 5,943,519 00 1,479,525.00 70' 15'9.358 N 151° 18'0,654 W - plan hits target center -Circle (radius 100.00) 9/11/1017 2:24:54PM Page 9 COMPASS 5000.14 BuW 85 ConocoPhillips Database: OAKEDMP2 Company: CcnocoPhillips(Alaska) Inc. -WNS Project Western North Slope Site: CD5 Alpine West Pad Well: Rig. CD5-316 Wellborn: Rig: CD5-316 Design: CD5-316wp16 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig: CD5-316 Cl actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70 44usft (Doyon 19) True Minimum Curvature Casing Points Vertical Local Coordinates _.... _.. Depth Measured Vertical +E/ -W Casing Hole Depth Depth (ueft) Diameter Diameter (usft) (usft) Name f1 ('9 2,360.00 2,176.50 133/8" 13-3/8 16 13,838.00 6,068.14 9 518" 9-5/8 12-1/4 19,336.00 7,445.75 7" x 8-1/2" by 9-7/8" 7 9-7/8 29,086.64 7,520.44 4-1/2"x6-1/8" 4-1/2 6-1/8 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/S +E/ -W (usft) (usft) (usft) (ueft) Comment 19,278.96 7,443.54 -12,526.50 -10,550.41 Adjust TF to 0°, for 57.04' 19,33600 7,445.75 -12,58243 -10,539.47 Adjust TF to 00, for 20' 19,356.00 7,446.52 -12,602.05 -10,535.63 Start 3°/100' DLS, 65.56° TF, for 139.41' 19,495.41 7,449.82 -12,739.60 -10,51344 Hold for 8310.12' 27,805.53 7,520.30 -20,982.75 -9,462.87 Start 1°/100' DLS, 49.15° TF, for 7557' 27,881.10 7,52062 -21.057.76 -9,453.69 Hold for 1205.54' 29,08664 7,520.44 -22255.09 -9,313.22 TD: 2908664'MD, 7520.44'TVD 9/11/2017 2: 24:54PM Page 10 COMPASS 5000.14 Build 85 AC Summary ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-316 Rig: CD5-316 501032075600 CD5-316wp16 ConocoPhillips Clearance Summary Anticollision Report 11 September, 2017 Trov. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CDS Alpine West Pad -Rig: CDS-316 -Rig: CDS-316 -CDS-316wp16 Well Coordinates: Datum Height: CDS-316 actual @ 70.44usft (Doyon 19) Scan Range: 19,336.00 to 29,086.64 usft. Measured Depth. Scan Radius is 3,105.02 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.14 Build: 85 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 10D/1000 of reference Scan Type: 25.00 ConocoPhillips Conoco hillips Anticollision Report for Rig: CD5-316 - CD5-316wp16 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CDS Alpine West Pad - Rig: CD6316 - Rig: CDS-316 - CD631Swp16 Scan Range: 19,336.00 to 29,086.64 usft. Measured Depth. Scan Radius is 3,105.02 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Site Name Depth Distance Depth Comparison Well Name - Wellbore Name -Design (usft) (usft) (usft) CD5 Alpine West Pad Rig: CDS-316-CD5-316PB1-CD5-316PB1 19,991.15 264.87 19,991.15 Survey tool proctram From To (usft) (usft) 98.80 1,076.25 1,133.92 2,289.67 2,386.06 13,800.59 13,873.32 13,873.32 13,935.17 19,278.96 19,278.96 20,836.00 CD5-316wpl6 19,336.00 29,086.64 CD5-316wp16 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. Survey/Plan Ellipse @Measured Separation Depth (usft) usft 145.19 19,525.00 ConocoPhillips(Alaska) Inc. -"S Western North Slope Clearance Summary Based on Factor Minimum 2.039 Clearance Factor Survey Tool GYD-GC-SS MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD MWD+IFR-AK-CAZSC Separation Warning Pass - Major Risk 11 September, 2017 - 14:22 Page 2 of 4 COMPASS CD5-316vvp16 Ladder View Measured Depth pth From Depth To Survey/Plan Tool T D MD Nam 98.80 1076.25 CD5-316 Srvy 1 - SLB_GWD70 (CDSWESRLL PS 7445.75 19336.00" x 8-1/2" by 9-7/8" 1133.92 2289.67 CD5-316 Srvy 2 - SLB_MWD+GMACAQ'6tD5*fWK4PAZ-S 7520.44 29086.64 4-1/2" x 6-1/8" 2386.0613800.59 CD5-316 Srvy 3 - SLB_MWD_GMAGvTOV549T6M4PAZ-S 13873.3213873.32 CD5-316PB1 Srvy 1 - BHI_MW13WERJWASMI ZSBB1) 13935.1719278.96 CD5-316 Srvy 4 - SLB_MWD+GhXAGi4RWjnN)BAZHjC 19278.96 20836.00 CD5-316wp16 (Rig: CD5-316) MWD 19336.00 29086.64 CD5-316wp16 (Rig: CD5-316) MWD+IFR-AK-CAZ-SC 19500 19800 20100 20400 20700 21000 Partial Measured Depth 14:33, SapfBmOCr 11 2017 CD5-316wp16 TC View SURVEY PROGRAM 5 C I ION DETAILS From To Tool MD Inc Azi TVD Dleg TFace Target Annotation 98.80 1076.25 GYD-GC-SS 19278.96 87.78 168.93 7443.54 0.00 0.00 Adjust TF to 0', for 57.04' 1133.92 2289.67 MWD+IFR-AK-CAZ-SC 19336.00 87.78 168.93 7445.75 0.00 0.00 Adjust TF to O', for 20' 2386.06 13800.59 MWD+IFR-AK-CAZ-SC 19356.00 87.78 168.93 7446.52 0.00 0.00 Start 3°/100' DLS, 65.56' TF, for 139.41' 13873.3213873.32 MWD+IFR-AK-CAZ-SC 19495.41 89.51 172.74 7449.82 3.00 65.56 Hold for 8310.12' 13935.1719278.96 MWD+IFR-AK-CAZ-SC 27805.53 89.51 172.74 7520.30 0.00 0.00 CD5-316 02, Toe 090717 VC6tart 1 o/100' IDLE, 49.15* TF, for 75.57 19278.96 20836.00 MWD 27881.10 90.01 173.31 7520.62 1.00 49.15 Hold for 1205.54' 19336.00 29086.64 MWD+IFR-AK-CAZ-SC 29086.64 90.01 173.31 7520.44 0.00 0.00 CD5-31603. 1 k 091117 JC TD: 29086.64' MD, 7520.44'TVO CASING DETAILS TVD MD Name 7445.75 19336.00"x 8-1/2"by 9-7/8" 7520.44 29086.64 4-1/2'x 6-1/8" 0 180 330 30 150 0. 1927 12 19279 - 1947 19470- 1966 300 60 90 19660- 1985 - 19850 2004 20040- 2022 60 0220 2041 0410 - 2060 3 0600 2090 0900 2120 1''� 1200 1500 - 2150 2180 270 90 1800 - 2210 3 2100 - 2240 2400 2270 6 22700 - 2300 3000 2360 3600 - 2420 240 90 120 4200 -- 2480 4800-2540( 12 5400 2601 6010 2661 6610.. 2721 15 7210 - 2780 210 150 180 180 0 g r CD5-316wp16 19336.00 To 29086.64 Spider CDS-07 Easting (7000 CD5-04 CD5-17L1 AC wells af��v (NOT a Spider) Mn, Se em0ar 11 Wit CD5-316wp16 19336.00 To 29086.64 AC Flipbook SURVEY PROGRAM 0 0 19279 19279 19470 epth From Depth To Tool GYD-GC-SS 98.80 1076.25 1133.92 2289.67 MWD+IFR-AK-C 2386.0613800.59 MWD+IFR-AK-C 90 19470 19660 13873.3213873.32 MWD+IFR-AK-C 13935.1719278.96 MWD+IFR-AK-C 330 30 19660 19850 19278.96 20836.00 MWD 19336.00 29086.64 MWD+IFR-AK-C 19850 -- 20040 60 20040 202"1 20220 20410 CASING DETAILS TVD MD Name 7445.75 19336.00" x 8-1/2" by 9-7/8" 300 60 20410 20600 7520.44 29086.64 4-1/2" x 6-1/8" 30 20600 20900 20900 21200 MD Azi TFace 19278.96 168.93 0.00 19336.00 168.93 0.00 - 21200 21500 19356.00 168.93 0.00 19495.41 172.74 65.56 21500 21800 27805.53 172.74 0.00 27881.10 173.31 49.15 90 21800 22100 270 29086.64 173.31 0.00 22100 22400 22400 '- 22700 3 22700 - . __ 23' � 23000 23600 240 120 23600 - 24200 60 24200 24800 24800 25400 25400 26010 210 150 90 26010 26610 180 26610 27210 27210 27805 Errors Report ConocoPhiIli ps(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-316 501032075600 Rig: C135-316 Plan: CD5-316wp16 Error Ellipse Survey Report 11 September, 2017 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CDS Alpine West Pad Well: Rig: CDS-31 6 Wellbore: Rig: CD5-316 Design: CD5.316wp16 ConocoPhillips Error Ellipse Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: C05-316 CDS-316 actual @ 70.44usft (Doyon 19) C05-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° fell Rig: CD5-316 Tie On Depth: 19,278.96 Depth From (TVD) Fell Position +N/ -S 0.00 usft Northing: Latitude: (usft) +EbW 0.00 usft Fasting: Longitude: osition Uncertainty 1,133.92 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 in Wellbore RigCD5-316 Magnetics Model Name Sample Date Declination Dip Angie Field Strength (°) (1) (nTi BGGM2017 9/5/2017 17.00 80.79 57,450.28 Design Audit Notes: Version: Vertical Section: CD5-316wp16 Phase: PLAN Tie On Depth: 19,278.96 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) i°) 3644 0,00 0.00 170.00 Survey Tool Program Date 9/11/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 98.80 1,076.25 CD5-316 Srvy i - SLB_GWD70 (CD5-316 GYD-GC-SS Gyrodata gyro single shots 1,133.92 2,289.67 CD5-316 Srvy 2-SLB_MWD+GMAG(CD MWD+IFR-AK-CAZ-SC MWD -IFR AK CAZ SCC 2,386.06 13,800.59 CD5-316 Srvy 3- SLB_MWD _GMAG(CD MWD-IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,873.32 13,873.32 CD5-316PB1 Srvy 1 - BHI _MWD+IFR+MS MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,935.17 19,278.96 CDS-316 Srvy 4 -SLB MWD+GMAG(Rig MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 19,278.96 20,836.00 CD5-316wp16(Rig: CD5-316) MWD MWD -Standard 19,336.00 29,086.64 CD5-316wp16(Rig: CD5-316) MWD+IFR-AK-CAZSC MWD+IFRAKCAZSCC 9/11/2017 2:25.'93PM Page 2 COMPASS 5000.14 Build 85 Conocolphillips Error Ellipse Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Rig: CD5-316 Project: Western North Slope ND Reference: C05-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: Rig: CD5-316 North Reference: True Wellbore: Rig-. C05-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp16 Output errors are at 1.00 sigma 6 19,278.96 20,836.00 CD5-316ai (Rig: CD5-316) Database: OAKEDMP2 i Plan Survey Tool Program Date 9/11/2017 MWD - Standard 7 19,336.00 Depth From Depth To Emar Emr (usft) (usR) Survey (Wellbore) Tool Name Remarks 19 1 98.80 1,076.25 CD5-316 Srvy 1 - SLB _GWD70 GYD-GC-SS I-10 leaft) wo Gymdata gyro single shots Naf) 2 1,133.92 2,289.67 CDS-316 Srvy 2-SLB_MWD+G MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3 2,386.06 13,800.59 CD5-316 Srvy 3-SLB_MWD_G MWD+IFR-AK-CAZ-SC MNsarea MWD+IFR AK CAZ SCC 4 13,873.32 13,873.32 CD5-376PB1 Srvy 1 - BHI MWD MWD+IFR-AK-CAZ-SC Lam., MWD+IFR AK CAZ SCC 5 13,935.17 19,278.96 CD5-316 Srvy 4-SLB_MWD+G MWD+IFR-AK-CAZ-SC Earth MWD+IFR AK CAZ SCC 6 19,278.96 20,836.00 CD5-316ai (Rig: CD5-316) MWD Bias Error MWD - Standard 7 19,336.00 29,086.64 CD5-316wpl6 (Rig: CDS-316) MWD+IFR-AK-CAZ-SC Emar Emr MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station MNsarea ls, aeon Azimuth vernal Hi9h.M. Lam., vanlnl Magntlutle semlmai0r Sean minor Earth Death E. Bias Error Bias Error as. of Bias Emar Emr Azimuth Tod (waft) 1'1 19 fusel W ft) (waft) I-10 leaft) wo (uah) Naf) (waft) (vaft) (11 100.00 0.64 30800 10000 0.05 000 0,D5 000 1.15 0.00 DIM 0.05 0.05 45.00 GYD-GC-W(1, 1) 200.00 0.54 239.13 19999 0.18 000 0.18 0.00 1.15 0.00 0.00 0.18 0.18 13500 GYD-GC-w(1. 1) 300.0 1.35 209.18 299.98 0.31 0.00 0.31 O.W 1.15 0.01 0.01 0.31 0.31 13500 GYD-Gc-ss(1. 1) 400.W 2.76 N&M 399.92 0.44 000 044 00 1.15 0.01 001 0.44 0.44 1NA4 GYD-GGSS(1. 1) 500.00 303 202.26 499]5 057 0.00 057 0.0 1.15 0.02 002 0.57 0.57 95.83 GYD-GGBS(1, 1) 600.00 4.05 200.4 60,53 071 0.0 0l1 0.00 1.15 004 0.04 0.71 0.71 4500 GYD-GCSS(1, 1) 700.00 8.33 20520 699.12 0.85 O.W Oas 000 1.15 D.D5 0.05 096 0.88 33.21 GM -GC -SS (1, 1) 00.00 8.74 217.71 798,26 1.0 -0.01 1.02 000 1.15 0.07 0.07 1.02 1.01 23.39 GYD-GC-6S(1, 1) 90.0 10]6 219.91 09682 1.14 -0.01 1.19 0.00 1.15 009 0.09 1.19 1.16 25.99 GYD-GC-SS(1, 1) 1,00000 13.41 219.28 99458 1.29 -001 1.37 0.0 1.15 0.11 0.12 1.37 1.32 31,01 GYD.GC-Ss(1. 1) 1,100.0 14.81 21&24 1,091.50 1.43 -0.02 1.53 0.0 1.15 0.14 0.14 1.53 1.48 3375 MWD+IFR-AI(-CAZ-W(1, 2) 1,200.0 Was 216.46 1,187.84 1.45 4 02 158 0.0 1.15 0.17 0,17 1.58 1.50 34.51 MW9HIFR-AK-0AZ-SC(1. 2) 1,300.00 19.55 215.0 1,282.0 1.45 -O.W 1.62 0.00 1.14 0.20 0.20 1.62 1.53 3474 MW IFR-AK-0AZSC(1. 2) 1,400.00 21.95 213.88 1,376.37 1.46 -0.04 1.70 0.00 1.13 0.23 0.23 1.70 1.65 34.55 1J S 1FR-M-CAZSC(1, 2) 1,500.00 2470 211A0 1,46022 1.48 .0.06 1.82 000 1.13 026 0.27 1.82 1.80 34.20 MW 1FR-AI(-CAZSC(1, 2) 1.60.0 27.12 210.78 1,550.14 1.51 -0.0 1.97 am 1.12 038 0.30 1.97 IN 33.4 MWD-IFR-AK-CAZ.50(1,2) 1)0.0 29.04 210.65 1,648.04 I'M 4OB 2.17 0.01 1.12 083 034 2.17 1.71 32.55 MWDHFR-AK-CAZ-W(1, 2) 1,000.0 31.79 211.13 1,731.87 1.59 -009 240 00 1.13 am 0.38 2.40 1]8 3187 MWDHFR-AK-CAZ-W(1, 2) 1,900.0 32.10 211.26 1,816.69 1.97 -0.M 252 0.0 1.15 0.40 0.42 252 1.84 31.59 MWD-IFR-AK-CPZ-W(1. 2) 2,000.00 35.49 211.0 1.899.97 1.71 4.12 269 0.00 1.17 044 0.47 269 1.91 31,35 MW➢+IFR-W-0A-SC(1, 2) 2,10.00 36.47 21271 1,979.70 1.77 -0.14 2.99 0.00 1.19 0.47 0.51 2.99 1.88 31.12 1JYrDHFR-AK-CAZ-SC(1, 2) 2,20.00 40.29 215.55 2,07.01 1.86 -0.16 9.29 -0.01 122 0.51 0.56 3.30 2.0 31.0 MW IFR-AK-CIS-SC(1, 2) 2,3M.W 4.29 217.03 2,132.13 1.94 .0.18 3.0 -0.02 1.25 0.65 0.60 3.61 2.14 31.22 MW IFR-Al(-CAZSC(1, 3) 2,30.W 42.36 217.87 2,176.50 2.97 -0.18 3.79 -0.02 1.25 DIM 0.65 3.97 2.20 3158 MWDNFR-AK-CAZSC(1, 3) 9/112017 2:25:33PM Page 3 COMPASS 5000.14 Build 85 Company: ConomPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CDS Alpine West Pad Well: Rig: CD5-316 Wellbore: Rig: CD5.316 Design: CD5-316wp16 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output emors are at Database: Well Rig: CD5-316 CDS-316 actual @ 70.44us@ (Doyon 19) CDS-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Position uncertainty and bias at survey station Measured Inclination Azimuth V.M-1 H,hM1 ,de uwR ] Wrt.w lft,d d seal 8.n r Semlminw Depth Depth E., Bias Error Bias Ener Bias an'. E. Emor A,dai M Tod (awn) 1°I 1°1 lean) (urnl (den) (usn) (urn) (asn) (-M loan) Imn) team (9 2400.00 42.55 21836 2206.03 200 -0.18 3.81 -0.02 1.26 0.58 0.65 382 2.20 31.64 MWD+IFR-AK-CA -SC (1, 3) 2,500.00 44.93 21067 2,278.66 1.95 -021 397 .0.02 126 062 070 3.99 2.22 32.10 MWD+IFRAKCAZSC(1, 3) 2.80000 4785 219.21 2,347.44 1.96 -024 4.17 4).03 1.26 0.66 075 4.19 2.25 Use MWTRIFR-A -$C(1, 3) 270000 50.12 220.03 2,413,37 196 -027 443 4.03 1.28 0.69 ON 4.45 2.28 33.29 MWD+IFRAKCAZSC(1, 3) 2,80000 52.80 221.14 2,675.58 1.97 .031 AIM 4,W 130 073 085 475 2.32 3400 MW IFRAK-CAZSC(1, 3) 2,90000 55.33 22349 2534.16 2.01 -0.35 506 4.06 134 076 090 5.11 2.36 34.81 MM -IFR AK-CAZ-SC(1, 3) 3,000.00 57.67 225.25 2,589.35 2.05 4.38 545 AN 1A0 079 095 5.51 240 35.74 MM+IFRAKCAZ-W(1, 3) 31100.00 59.89 MAD 2641.16 2.10 4.42 5.80 -0.09 147 0.82 1.00 5.95 2.M 38.73 MWD+IFR-AK-CAZ-=(1, 3) 3,200.00 6221 228.85 2,68958 215 -0A6 633 -0.09 1.58 0.84 105 6.40 2.69 37.65 MM+IFRAK-CA -W(1, 3) 3.30000 8129 22155 2734.59 222 -0.49 680 Alo 168 0.87 1.10 6.87 253 38.50 MWD+1FR-AKCA -SC(1. 3) 3,40000 67.04 229.58 2,775.75 2.30 -054 7.20 -0.13 1.77 0.09 1.15 7.38 2.50 39.37 MM+IFR-AK-CM-W(1, 3) 3,500.00 69.16 22904 2,812.88 2.38 -058 778 -0.13 189 091 1.20 7.88 262 40.17 MWD+1FR-AK-CAZ-SC(1. 3) 3,600.00 6991 22895 2.817.92 249 -059 0.15 -0.12 2.02 Des 124 8.23 2.68 40.84 MWD+IFR-AKCAZ-SC(1, 3) 3,700.00 71.14 22845 2,80129 2.59 .0.62 8.50 -0.11 2.15 0.95 1.29 8.57 2.69 41.03 MWD+1FR-MCA,5C(1. 3) 3,80000 72.01 22161 2,912.62 271 -0.63 8.89 -DAD 2.29 0.96 131 893 2,73 41,40 MWD+IFR-AKCAZSO(1, 3) 3,900.00 72.09 226.43 2,9,13,52 285 -063 9.19 -0.00 244 ON 1.30 9.22 2.76 41.63 MWD+IFR-AKCAZ-SC(1, 3) 4,00000 72.42 225.04 2,974.01 2.99 -064 9.47 41.05 259 100 1.43 8,49 2.79 41.80 MWD+IFR-AKCAZSO(1, 3) 4,100.00 7257 22376 3,003199 3.13 -0.64 978 41.03 274 1.01 tA8 978 282 41.93 MWD+IFRAK-CAZ-SC(1, 3) 4.200.00 72.63 223.10 3,033.94 3.28 4,65 1009 4).03 289 1.03 1.53 10.10 285 42.02 MWWIFRAK-CAZ-SC(1, 3) 4,300.00 72.59 223.21 3,063.77 3.44 -0.64 10.39 -0.02 3.05 1.05 758 10.39 2.89 4206 MWO+IFR-AK-CAZ-SC(1, 3) 4,400.00 7255 223.61 3,09176 3.60 4.64 1066 41.03 3.20 1.08 1.60 1065 2.92 4205 MW0+1FRAK-CM-50(1,3) 4,500.00 7258 22414 3,12172 376 4`.64 1099 -001 336 100 1.69 10.99 2.95 42.07 MM+IFR-AK-CA -W(1, 3) 4,600.00 72.58 M.72 3,15368 392 4).84 11.33 -003 3.52 1.10 175 11.33 2.98 42.11 MM+IFR-AK-CM-SC(1, 3) 4,700.00 7260 224.38 3,103.50 609 -064 11.66 -0.04 3.60 1.12 1.80 11.67 3.02 42.16 MWD+1FR-AK-CA -SC (1, 3) 4,80000 72.06 224.13 3.213.91 426 -063 11.96 -0.04 383 144 1.06 11.96 3.05 42.18 MWD+IFR-Al(-CA-SC(1, 3) 4,900.00 71.59 224.53 3.245.12 4.43 -061 12.19 -0.05 3.99 1.16 1.92 12.20 3.09 42.18 MWD+IFR-Al(-CAZSC(1. 3) 5,000.00 71.53 22528 3,276.75 460 -0.81 1249 4).07 4.15 1.18 1.90 12.51 3.12 42.21 MW IFR-AI(-CAZSC(1, 3) 51100.00 71.54 225.50 3.308.43 4.77 -061 12.08 408 4.31 1.20 2.04 12.90 3.16 4228 MWD+IFR-AKCAZSC(1, 3) 5,200.00 71.56 225.94 3,340.05 4.07 -081 1520 4"09 447 122 2.10 13.30 120 42.38 MWD+IFR-AK-CAZSC(1, 3) 5.30D.00 71.56 226.29 3,371.70 5.10 -0.61 13.67 -0.10 464 iN 2.16 13.70 324 4248 MWTAIFR-AKCA2SC(1, 31 5.I000 71.5,1 225.78 3,403.37 5.27 4,61 1402 -0.08 480 1.26 223 14.04 3.28 42.56 MW IFRAK-CM-SC(1, 3) 5,50000 71.56 225.50 3,435.01 5.43 -061 1436 41.07 696 128 2.29 14.38 3.32 4263 MW IFR-AK-CAZ-SC(1, 3) 5,6m.w 71.56 225.38 3,46084 580 -0.01 1473 -0.07 5.12 1.30 2.36 16]4 3.36 42.70 MWD+IFRAK-CAZ-SC(1, 3) 5,70000 71.57 225.21 3,498.27 6.77 4.61 15.08 -0.06 528 1.32 243 15.10 341 42.76 MWD+1FR-AK-CM-SC(1, 3) 5,800.00 71.55 225.47 3.52989 5.91 4.61 15" -0.07 504 1.35 2.50 15.46 345 42.82 MWD+1FRAK-iW-W(I, 3) 5,900.00 71.51 225.44 3,56158 6.11 CiAl 15.81 -0.07 560 1.37 2.56 1503 3.49 42.87 MM+IFR-AK-CM-SC(1, 3) GAUD 71.55 225.67 3.59320 6.28 -061 16.18 -0.08 5.77 1.39 2.63 1820 3.54 42.93 IAM+IFR-AK-CP -SC (1, 3) 6,100.00 71.55 22503 3,624.90 6.44 -061 16.57 -0.05 5.93 1.41 2.71 16.58 3.50 42.98 MM+IFR-AK-CA -W(1, 3) 6.20000 71.53 224.80 3,655.55 6,61 -081 16.89 -0.05 6.09 104 2.78 16.90 3.62 43.01 IAM+IFR-AK-OAZSC(1, 3) 6,30000 71.56 224.29 3.880.21 677 -061 17.22 -0.02 6.25 1.46 2.85 1122 367 43.03 MWD+IFR-AKCAZSC(1, 3) 6,40000 71.63 U4,68 3,71979 6.95 -0.62 17.59 41.01 6.42 1.d9 2.92 17.60 3.71 4305 MWD+IFR-AKCAZ4iC(1. 3) 6,Wo.00 71.41 224.68 3,75160 7.12 -0.61 17.84 -0.03 6.58 151 3.00 17.95 3.76 4307 MWD+IFR-AKCAZSC(1, 3) 6180000 71.56 224.91 3,783.24 7.29 -061 18.31 41.05 6.74 1.53 3.07 1832 3.81 43.09 MWD+IFR-AKCAZSO(1. 3) 6,700.00 71.50 225.19 3,81492 148 -061 18.71 41.07 6.91 1.55 3.15 18.72 3.85 43.12 MWD+IFR-AKCAZSC(1, 3) 6,80o.00 71.M 226.01 3,808.71 7,63 -061 19.07 4.05 707 1.50 3.23 19.08 3.90 43.15 MWD+IFR-AK-CM-SC(1, 3) 6190ow 71.46 224.80 3.878.53 7.80 -0.61 1943 -ow 7.23 1.61 3.31 is." 3.95 43.17 MWD+IFR-AK-CM-SC(1, 3) 7,00000 71.51 22508 3,910.28 7.90 4,61 19.81 -006 7.40 1.61 3.39 19.82 3.99 43M MM+IFR-AK-CMSC(1, 3) 7,100.00 71.49 225.08 3,94201 8.15 4.61 20.17 -006 7.53 1.66 307 20.18 0.00 4322 MWD+IFR-AK-CAZ-W(1.3) 7,200.00 71.15 225.06 3,97379 832 4).81 20.50 -0.08 773 1.69 3.55 20.51 4.09 43.23 MM+IFR-AK-CA -W(1, 3) 7,300.00 71.73 225.27 4,005.51 849 -0.62 20.05 4,07 7.89 171 3.0 20.86 4.14 43M MWO+1FR-AK-CK-SC(1, 3) 7,40000 72.00 22687 4,036.50 8.85 -0.64 2125 .0.05 abs 174 371 2126 4.19 413.28 MWD+IFRAK-CAASC(1, 3) 7,500.00 71.97 224.54 4.08143 8.82 -0.64 21.64 4).03 8.22 177 379 21.64 423 4331 MWD+IFR-AK-CAZSC(1, 3) 71600.00 71.96 22481 4,098.38 9.00 -o" 2203 4,05 83a 1.79 388 22.03 428 4332 MWD+IFR-AK-CKSC(1, 3) 7,700.00 71.99 224.95 4,129.30 9.17 -0.64 M.44 -0.05 8.55 1.02 396 22.45 4.33 4334 MWD+IFR-A)( AZSC(1, 3) 911112017 2:25:33PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Error Ellipse Report Company: ConowPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Rig CD5-316 Project: Western North Slope ND Reference: CD5-316 actual @ 70.44usR (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) g Well: Rig: CD5-316 North Reference: True t Wellbore: Rig: C05-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp16 Output errors are at 1.00 sigma Database: OAKEDMP2 Position uncertainty and bias at survey station Meaoured IndlMien AzinuM V H.I Hi9inMa UN.1 Wrt a M.,ftu4e Bemimalor 3emiminer mp% 0,M Eeor BW Enor Sim Error Sime WBias E., Error Azimuth Tool (unl M PI (u ) (Ma) lame IeMH limo Ilnnl Ire:nl (uch) lino Ian) l'1 7,80000 7201 22553 4,16021 935 -0.53 22.85 -0.09 871 184 465 22.86 438 43.36 MWUAFR-AK-CAZ-SC(1, 3) 7,90000 11.02 22852 4,191.09 9.53 -0.64 23.26 4.15 Sao 187 4.13 2329 443 4340 MWDNFR-AK-CAZ-SC(1, 3) 8000.00 71.98 225.93 4,221.99 9.70 464 2386 DA1 9.04 1.90 4.22 2380 448 43.44 MW IFR-A4(-CAZ-SG(1, 3) 8,10.00 71.82 225.56 4,253.05 9.87 483 24.00 -0.09 9.21 1.93 431 24.02 AM 43.47 Mw JFR-AK-CA-5C(1, 3) %mo.Oo 71.52 225.35 4,284.52 1004 -081 24.34 -008 837 1% 4A0 2436 4.58 43,49 MWD+IFR-AK-CAZ-SC(1. 3) 8300.00 71.49 22565 4,316.23 1022 -060 24.72 -0.10 9.54 198 4.49 24.74 463 4351 MM+IFR-AK-CAZ-W(1, 3) 8,40000 71.46 U6,74 4,348.00 10.40 460 25.12 -0.17 9.70 201 458 25.18 468 43.55 MWD+IFR-AK4AZ-SC(1. 3) 8,500.00 7103 22737 4,37982 1059 4.60 25.52 4M 986 2.04 467 25.57 4.73 43.59 MWD+IFR-AK-0AZ-SC(1, 31 8.600.00 71A9 27.11 4,411.66 10.75 4.60 25.91 -0.20 1003 2.07 477 25.95 478 43,641 MW0+IFR-MK AZ -SG (1, 3) 9,700.00 71.60 MA3 4443.26 1092 461 26.30 -0.15 10.19 2.10 4.08 25.33 483 4368 MWD+IFR-Al(-CA-SC(1, 3) B4O00.00 71.52 225.34 4.474.88 11.07 -0.61 26.60 -0.06 1036 2.13 495 2630 4.89 43.71 MWD+IFR-AK-CMSC(1. 3) 0,90000 71.44 224.88 4,508.65 11.24 -080 27.04 -0.03 1052 2.16 5.05 2705 4.94 4172 MWD+IFR-AK.CAZ-SC(1, 3) 9.000.00 71.45 V4.81 4,538.50 11.41 -0.60 27.42 -0.02 10.69 220 5.15 27.42 499 43.73 MWD+IFR-AK-CAZ-SC(1, 3) 9,100.00 71.47 225.40 4,57027 11.59 -0.60 7.82 -0c7 10.85 2.23 524 27.83 5.04 43]5 MWD+IFR-N(-CAZ-SC(1. 3) 9,200.00 71.52 226.05 480203 11.78 -0.61 28.23 -013 11.02 226 5.34 28.25 5.10 43.77 MWD+IFR-AK-GAZ-SC(1, 3) 9000.00 71.49 226.58 4.633.73 11.96 -0.60 2363 4A7 11.18 2.29 5.44 28.67 5.15 4379 MWD+IFR-M-CAZ-SC(1, 3) 9,40000 71.53 27.11 4,665.47 12.14 -061 29.05 4.7 1135 2.32 5.54 29.09 520 43.83 MWD+IFR-AA-CM-SC(1, 3) 9,50000 71.54 226.45 4.697.13 1230 -061 2946 -0.16 11.51 235 5.64 2949 5.25 43.87 MWONFR-AK-CAZSC(1. 3) 9.800.00 71,47 22806 4,728.85 12.47 -060 29.82 .0.12 11.88 2.39 575 29.85 531 43.89 MWD+IFR-AK-CAZSC(1, 3) 9,70000 71.53 225.46 4,76058 12.63 .0.61 30.19 -0.07 11.84 242 5.85 30.20 5.36 43.91 MWD+IFR-AK-CAZ-SC(1, 3) 9,00000 71.51 22,4.98 4)92.28 12.80 -0.61 3056 -002 1201 245 595 30.57 541 43.92 MWD+IFR-AK-CAZ-SC(1, 3) 9900.00 71.50 224.82 4,82399 12.97 4.61 30.93 -001 12.17 2.49 6.53 30.93 5.47 4392 MM+IFR-AK-CAZ-W(1, 3) 101000.00 71.48 22488 4,85575 13.14 -0.60 3130 -0.01 12.34 2.52 6.16 31.30 5.52 43.93 MWD+IFR-AK-CAZ-SC(1, 3) 10,100.00 71.52 225.56 4,087.45 1333 -0.61 31.68 -0.08 12.50 255 827 31.69 558 43.94 MW IFR -WC -SC (1, 3) 10,200.00 71.50 22535 4,919.18 13.50 -0.60 32.06 -0.08 1288 2.59 6.38 32.07 5.63 43.95 MWD+IFR-AK-CM-SC(1, 3) 10,30000 71.54 224.69 4.950.87 1388 -061 32.45 0.01 12so 262 6.48 3245 5.68 43.96 MWD+IFR-AK-CIS-SC(1, 3) 10400.00 71.52 22348 4,982.54 13.82 -0.61 32.84 0.13 12,99 286 659 32.84 5.74 4396 MWD+IFR-AWCISSC(1, 3) 10.500.00 71.47 73.19 5,01426 13.99 -0.60 33.22 0.17 13.16 269 670 3322 $1$ 4395 MWD+IFR-AK-CAZ-SC(1, 3) 10,60000 71.44 223.11 5,048.00 14.16 -080 3380 0.17 13.32 2.73 6.81 3380 5.65 43.93 IMM+IFR-AK-CAZ-SC(1, 3) 10,700.00 71.51 73.25 5,07788 14.34 -0.61 33.98 0.16 13.49 276 6.92 33.98 5.90 43.92 MWD+IFRAK-CPZ-SC(1, 3) 10,000.00 71,49 223A8 5,109.58 14.51 4.60 3437 0.13 1365 2.80 7.04 34.37 5.95 430 MWD+IFR-AK-CAZ-SC(1, 3) 10,90000 71.50 224.18 5,141.34 1470 -0.80 U.75 0.05 13.82 2.83 7.15 34,75 801 43.89 MWD+IFR-M(-CAZ-SC(1, 3) 11,00000 7156 224.97 5.17302 14.88 4.61 35.14 -0.04 13.90 2.87 726 35.15 606 43.89 MW IFR -ML -SC (1, 3) 11,100.00 71.54 225.21 5,204.65 15.06 -0.61 35.54 -0.07 14.15 2.91 7.38 35.55 6.12 43.90 MWWIFR-AK-CAZSC(1, 3) 11.200.00 7151 225.95 5,236.34 15.24 .0.61 35.94 -0.15 14.32 2.94 7.50 35.96 8.17 43.91 MWDHFR-AK-CAZSC (1, 3) 11,30000 71.51 225.56 5.260.05 15.41 -0.61 3634 -0.11 14.48 2.98 761 36.35 623 4393 VM+IFR-AK-CAZ-SC(1, 3) 11,400.00 71.48 226.39 5,299.80 1560 -0.60 36.72 -0.21 14.65 3,02 773 36]5 6.28 43.94 MWD+IFR-AK-CM-S0(1, 3) 11,50000 71.56 226.85 5,331 A9 15.78 -0.61 37.12 -024 14.81 3011 7.85 37.16 6.34 43,96 MWD+IFR-AK-CM-SC(1, 3) 11.600.00 71.52 225.77 5,363.17 15.93 -0.61 3754 -0.13 14.98 3.09 7.97 3756 6.39 43.98 MWD+IFR-AI4-GA!-SC(1, 3) 11.70000 71.52 22602 5,39485 18.11 4.61 37.93 -0.16 15.14 3.13 8.09 3795 8.65 4400 IMM+IFR-AI(-CAZ-SC(1, 3) 11,80000 71.48 228.13 5,426.62 1629 -0.60 38.33 -0.16 15.31 3.17 8.21 38.35 650 44.01 UW IFR-AK-CAZ-SC(1, 3) 11,90000 71.53 226.07 5,458.32 1846 -041 38.73 4.17 15.47 3.21 0.33 38.75 658 44.03 MWD+IFR-Al(-CAZ-SG(1, 3) 12,000.00 71.53 225.88 5.480.01 18.63 4.61 39.12 4.14 1564 325 8.45 39.14 6.62 44.04 MWD+IFR-AK-CMSC(1, 3) 12,100.00 71.55 228.01 5,521.88 16.81 -0.61 39.51 -0.16 15.80 329 858 3954 6.67 4406 MWD+IFR-AK-CAZSC(1, 3) 12,20000 71.53 225.58 5,553.32 1897 -0.61 39.90 -0.10 1597 3.33 670 3991 6.73 44.07 MWD+IFR-AK-CAZ-SC(1, 3) 12,30000 71.55 225.38 5,584.99 17.14 S61 4029 -007 16.13 337 8.03 40.30 6.78 44.08 MWD+11FR-AK-CAZ-W(1, 3) 12,400.00 71.56 7531 5,616.61 17.31 -0.61 MSS -005 16.30 3.41 695 40.88 6.84 44.08 M=+IFR-AK-CAZ-SC(1, 3) 12,500.00 71.49 224.43 5,648.28 1747 -0.60 41.06 007 16.46 345 9.0 41.05 6.89 4409 MWD+IFR-MK- -SC (1, 3) 12,80000 71.50 224.04 5.680.04 1764 AIM 41.43 0.12 16.63 3.49 9.21 41,43 895 44.08 MWD+IFR-AK-CAZ-SC(1, 3) 12,700.00 71.54 224.29 5,71174 1782 4.61 41.83 0.09 16.79 3.53 9.33 4183 701 44.08 AW IFR -N4 -SC (1, 3) 12.800.00 71.64 224.34 5]4333 17.99 -0.63 42.23 0.0 16.96 3.57 946 42.23 7.53 44.08 ld T IFR-M-CA!SC 11, 3) 12,900.00 71.04 224.83 5,774.51 18.17 -0.69 42.63 000 17.12 3.61 9.59 4264 7.12 44.08 MWD+IFR-AK-CAZSC(1. 3) 1300000 71.98 224.43 5,805.38 18.34 -0.68 43.03 0.07 17.29 365 Bit 43.03 7.17 4408 MWD+IFR-AK-CM-eC(1, 3) 13.100.00 71.98 224]7 5,838.31 18.52 -068 43A1 0.01 17.45 3.69 9.85 43.41 7.23 44.08 MM+IFR-AWCAZSC(1. 3) 91112017 2:25:33PM Page 5 COMPASS 5000.14 Build 86 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CDS-316 Wellbore: Rig: CD5-316 Design: CDS-316wpl6 Position uncertainty and bias at survey station ConocoPhillips Error Ellipse Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig'. CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Measured lirctarallon AaanuM VaMwl H190eide lateral VeMcal 1Aa9pd9de S..jor S.I.Inpr D41M8 Oapta Error Bias Error Bias Error Blas NBlas E"r Error Av.M Tool '.. (-M P) (1) (mel (esn) lusn) (usn) (.en) W) (-ft) fuse) (-ft) W) m 13,200.00 7193 22462 5.867.29 18.69 -0.67 43.79 0.04 17.62 373 9.98 4300 728 44.08 MWD•IFR-AK-CPZ-6C(1, 3) 13,300.00 71.93 224.58 5.896.34 16.87 -0.67 41.10 0.00 17.79 3.77 10.12 44.18 7.34 44.08 MM -IFR AK -CX! -SC (1, 3) 13,400.00 71.89 225.42 5,929.27 1905 4).87 445a -0.10 17.95 3.81 1025 "sli 7.39 4408 VM-IFR--CAZ-W(1. 3) 13,500.3 7150 225,93 5.96078 19.24 -0.60 ",96 -0.18 18.12 3.86 Mai "As 7.45 44.09 MM.IFR-AK-CAZ-SC (1, 3) 13,800.00 7149 226.67 5,992.51 19.43 -080 4533 -0.31 18.28 3.3 10.52 45.37 7.51 44.10 MM -IFR -AK -Cr -SC(1, 3) 13,70000 7146 226.71 6,024.28 19.61 -059 45.72 -031 18.45 3.94 10.66 45.77 7.56 44.12 MWD+1FR-AK-CAZSC(1, 3) 13,80000 71.4" 228.74 8,05009 1910 -0.59 0.12 4).32 18.61 3.99 10.80 46.16 7.62 44.14 MWD+IFR-Al(-Cr1Z4C(1, 3) 13,83800 71.50 M7.62 6,068.14 19.09 -064 46.27 4).62 10.66 402 1090 4640 7.n 44.14 MWD+IFR-AK-CAZSC(1, 4) 13303 71.57 228.17 8.087,66 19.00 4)62 46.35 4).57 1666 4.3 10.94 "6.47 7.72 41.14 WW IFR-A9(-0AZSC(1, 5) 14,000.00 71.78 MT10 0,119.32 19.85 .065 46.67 -0.30 18.88 4.00 1108 48]3 7.73 44.17 MW IFR -AK -CP -SC (1, 5) 14.100.00 Was 22550 6.151.72 19.03 -024 46.98 4.0 1866 4.12 1122 46.99 7.74 44.10 MWD+IFR-AWCAZ-SL(1, 5) 14,20000 66.80 224.07 618882 19.79 0.32 47,25 0.03 18.7 4.10 1137 47.26 7.75 44.19 MWD+1FR-AK-CAZ-SC(1, 5) 14,300.00 66.50 225.10 6220.75 19.00 0.37 47.51 -002 1867 4.24 1163 4751 7.76 4420 MWD+1FR-AK-CAZ-6C(1, 5) 14,40000 67.58 22445 6.267.76 19.81 0.17 4777 011 1668 4.30 1160 47.77 7.77 4420 MWD+1FR-AK-CAZ-SC(1, 5) 14,500.00 6093 223.70 6,304.81 19.81 -C)M 4603 025 18.69 4.35 11.84 4804 7.76 4420 MWD+IFR-AK-CM-SC(1, 5) 14,600.0 7031 222.16 6.33963 1981 -0.40 48.28 055 18.70 4.41 11.99 48.31 7.90 44.26 MWD+1FR4K-CAZ-W(1, 5) 14,700.00 7143 221.30 8,3]2.37 1981 -0.84 4853 0]0 1671 446 12.14 40.59 7.81 44.19 MWD+1FR-AK-CAZ-SC(1. 5) 14,80000 72.26 220.41 6.403.49 19.80 -0.82 48.78 0.89 18.72 4.51 12.28 40.00 7.82 44.17 MWD+1FR-AK-CAZ-SC(1, 5) 14,90000 72.77 216.47 6.433.49 19.80 -094 48.94 1.28 18.73 4.55 1243 49.17 7.84 44.14 MWD+IFR-AK-CAE-M(1, 5) 15,000.00 73.10 216.94 6462.85 1982 -1.03 4909 161 18.75 459 1257 4947 7.85 44.10 ld O.IFR-AKLAZ-SC(1, 5) 15,10000 73.33 216.62 8491.83 1983. -100 49.35 165 18. 483 1271 4977 7e7 R,05 MWD+11FR-AK-C ZSC(1, 5) 1620000 73.18 216.52 6,520.40 1985 -1.04 49.62 1.67 18.78 4.68 1286 50.04 i88 44.02 MWD+IFR-AK-CAZ-SC(1, 5) 15,300.00 73.15 21581 6,549.46 19.00 -1.04 49.02 1.82 10.80 4.72 1300 50.32 7.89 43.97 ld M]FR-Al(-CAZ-SC(1, 5) 15,400.00 7321 215.55 8,57032 19.90 4.06 50.09 167 18.83 4.76 13.14 50.62 7.91 43.92 MW IFR-AR-CAZ-SC(1, 5) 151500.0 73.17 21585 6,607.26 19.92 -1.05 50.41 1.81 18.05 4.00 13.29 50.90 7.92 4387 MWD+IFR-AR-CAZ-SC(1, 5) 15 emoi0 73.43 21630 6.63607 19.94 -1.10 50.77 1.63 18.87 684 13.43 51.16 7.94 43.83 MWD+IFWM-CAZ-W(1. 5) 15,700.00 73.70 217.34 6.654.32 less -1.16 51.10 149 10.90 469 13.58 51.42 7.95 43.80 MW IFR -AK -CAE -W(1, 5) 15,800.00 73.74 217.69 6,692.32 19.98 -1.17 51.41 141 18.93 693 13]3 51.69 797 43.77 MWD+IFR-AK-CM-W(1. 5) 15,900.0 73.79 217.25 6,720.20 2001 -1.18 51.65 1.51 18.95 4.97 13.87 51.90 7.99 43.]3 MM+IFR-AI(-CAZ-SC(1, 5) 16,000.00 73.71 217.40 6,740.25 20.04 -1.16 51.96 1 4 1699 501 1402 52.27 8.01 43.69 MWD+1FR-AK-CAZ-W(1, 5) 18,13.00 73.87 210.10 6,7]6.19 20.07 -1.19 52.31 131 19.02 5.05 14.17 52.55 8.02 43.66 MWD•IFR-N(-CAZ-SC(1. 5) 16,20000 73.29 219.20 6,804.47 20.12 404 5288 1.4 1905 5.10 14.32 52.83 804 43.63 MWD+IFR-AK-CAESC(1, 5) 16,3W,W 73.22 219.43 6.833.31 20.16 -1.03 Usti 1.00 1909 5.14 14.47 53.12 60 4360 MWD•IFR-AK-CAZSC(1, 5) 16,4M.W 73.38 21943 6,86203 20.19 .1.07 5328 101 19.12 5.18 1462 53.42 8.08 43.58 MM+IFR-AK-CAESC(1, 5) 16,500.3 73.32 219.36 6890.63 2023 -105 53.57 1.02 19.16 623 14.70 53.72 8.10 43.55 1JWD+IFR-AK-DAl(1, 5) 16,600.W 7309 21953 8919.59 20.28 -0.99 53.89 090 19.20 627 14.93 54.02 0.12 43.53 MWD+IFR-AK-C Z-SC(1, 5) 16,700.W 7321 218.85 6,948.63 20.31 -1.03 54.15 1.15 1924 5.32 Isle 54.32 8.14 4350 MW IFR-AK-CAZ-SC(1, 5) 18,800.W 7332 21841 6,977,33 20.35 -106 54.42 1.26 19.28 5.36 1524 54.63 8.16 4347 MW IFR-AK-CAZ-SC(1, 5) 16,30.3 73.20 218.15 7,006.12 MAO .105 54.71 1.32 19.32 5.41 1640 5494 8.18 43.14 MW]HIFR-AKCN!-SC(1, 5) 17,303 73.07 217.97 7,03494 20.45 4).99 55.W 1.37 19.37 5.45 15.56 5525 8.21 43.41 WW IFR-AK-CAZ-6D(1, 5) 17.1300 7306 217.75 7,06424 20.49 4).99 55.29 142 19.41 5.50 15.]2 55.55 8M 43.37 MWD+IFR-AK-O -SC (1, 5) 17,200.00 7304 217.44 7.09329 20.54 -0.99 55.57 1.50 19.46 5.55 15.88 55.96 8.25 43.34 MAD+IFR-AK-CA2-SC(1. 5) 17.30.W 73.0 218.57 7,122.52 2060 -119 5519 1.73 19.51 5.3 16.04 56.17 8.27 43.30 MWD+IFR-AK-CAZ-W(1, 5) 17,400.W 73.66 214.97 7,151.26 20.0 -1.19 55.92 2.15 19.56 5.64 16.20 56.49 8.30 43.25 MWD+IFR-AK-LAZ-W(1, 5) 17,500.W 74.30 213.90 7.178.82 20.69 -1.38 56.10 2.43 19.61 5.69 1636 0.83 632 4820 MWD+1FR-AK-CAZ-SC(1, 5) 17,6W.W 74.79 21180 7,20.46 20.76 -1.54 5608 2.90 19.66 5.73 1651 57.17 8.35 43.13 MWD+1FR-AWCAZSC(1, 5) 17,7W.W 75.02 210.0 7,231.46 2083, 4.63 56.0 3.46 1971 5.77 1666 57.51 8.38 "305 MWD+IFR-AK-CAESC(1, 5) 17,83.0 76.47 207.22 7,256.14 Z)86 -2.09 5672 4.20 1937 5.01 10.01 57.84 0.41 /2.0 00W0+11FR-AK-0AZSC(1, 5) 17,900.2 7701 20509 7,279.0 20.82 -2.28 55A7 4.77 19.83 5.04 16.% 58.19 8.41 42.05 1JWD+1FR-A%-CAE-SC(1, 5) 18.02.3 7616 27.40 7,301. 21.00 -2.29 54.94 5.40 19.09 5.80 17.10 5851 8.47 4273 MWSBIFR-AI(-0AZ-6C(1. 5) 16100.3 78.03 198.82 7.323.62 21.09 -2.70 53.95 6.42 19.95 5.91 17.24 58.84 8.51 4259 WW IFR -A3( -W(1, 5) 1812110.3 7985 195.71 7,342.76 21.01 -3.26 Use 7.22 20.01 5.94 17.37 59.17 am 4243 MW IFR -MK- -W(1. 5) 18,300.3 80.96 193.13 7,359.08 20.98 -3.62 52.14 7.87 20.07 5.96 17.49 59.50 8.61 42.25 MW]MIFR-AK-CAZ-W(1, 5) 16400.3 01.29 189el 7,374.81 21.04 -3.77 W.83 8.67 20.14 5.0 17.61 sets 8.0 42.7 MWD+IFR-AK-CM-SC(1. 5) 9/11/2017 2:25.33PM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips Error Ellipse Report Company: ConowPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Rig: C05-316 Project: Western North Slope TVD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-316 actual @ 70.44usft (Doyon 19) Well: Rig: CD5-316 North Reference: True Wellbore: Rig: CDS-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp16 Output errors are at 1.00 sigma - Database: 0AKEDMP2 Position uncertainty and bias at survey station M¢asure0 Iul4ullon AiunuN VeRlcal Nlg9aide labral Vertical M.,ittiEe SeTlmefq Sendminor nepN N"In Error Bles Error Boa Ertor Bias &Birt E. Ertor /Wmual TOW I -n) 1'1 (1) (um, (urn) (oan) luem (urn) (um) (-ft) ham (urn) hien) p) 18.500.00 82.59 18748 7,38882 20.95 4.16 49.84 9.27 2020 6.00 17]2 60.10 8.73 41.87 MWD+IFR-AK-CAZ-50(1.5) 18.60000 8373 10520 ],400.6] 2D.07 4.49 4892 879 20.27 6.01 17.82 00.40 8.81 41.84 MM+IFR-AK.CAZSC(L 5) 1870000 84A8 182.90 7,410.83 20.05 4.71 4787 1033 20.34 003 17.92 00.70 8.90 41.41 MW0+1FR-AK-CAZ-SC(1, 5) 18,00000 85.79 180.55 7,419.61 20.76 5.07 46.66 10.89 20.41 6.04 16.01 60." am 41.17 MWD+IFR-W-CAZ-SC(1, 5) isecam 97.20 178." 7,425.58 20.87 -5.41 45. / 11.32 2046 604 18.09 6127 9.11 40.91 MM+IFR-W-CAZ-W(1, 5) 19,000.00 8].3] 17576 7,43004 20.72 -5.48 44.08 11.95 2055. 6.05 18.17 6154 923 40.65 MWD+IFR-AK-CP -SC (1, 5) 19,100.00 87.11 172.07 7,464.86 2081 -5.46 41.65 12.72 2063. 6D5 16.24 6178 9.32 40.41 IdM-IFR-M6 AZ -SC (1, 5) 19,20000 67.11 168.52 7.439.95 20.88 -5.53 39.18 13,42 2071 6.06 18.31 6199 942 40.16 MWD+IFR-M%-0 -SC (1. 5) 19.278.96 87.70 160.93 7,443.54 20.80 -563 39]3 13.4 Mr 6.06 18.37 62.13 9.43 3999 1AW0+11FR-AK-CAZ-SC(1. 5) 19,30000 87.78 160.83 7.4".35 20.89 5 83 3986 1387 20.76 606 18.40 62.43 &95 3999 MWD (1, 6) 19,336.00 87.78 Islas ].445.75 20.89 3.63 40.21 13.46 20.76 6.07 18.50 62.68 8.99 39.73 Mind (1, 6) 19,356.00 87.78 188.93 7,446.52 20.89 -5.83 4041 13.52 2077 6.07 10.55 62.70 9.00 39.59 MWO(1, 6) 19,40000 80.33 170.13 7,"8.02 2085 -5.73 41.82 11,10 20.77 6.07 18.66 63.07 9.03 3917 Mwo(1, 6) 19,495.41 89.51 172.74 7,449.82 2080 -5.97 "as 13.10 2076 6.07 Was 63.72 9.15 38.60 MM (1, 6) 19,500.00 89.51 172.74 7,449.85 20.80 -597 ".90 13.11 20.78 6.07 18.91 6375 9.16 30.57 Mwo(1. 6) 19,80000 89.51 172.74 7,450.70 20.81 -5.97 45.95 13.34 20.79 6.07 19.14 64.47 832 37.89 Mwo(1, 6) 19,700.00 89.51 172.74 7,451.55 20.84 -597 47.01 1350 20.82 6.07 18.37 65.21 9.54 3720 VIM (1 6) 19,00000 89.51 17274 7,452.40 20.0] -5.97 48.11 13.82 2085 607 1980 65.96 9.81 36.51 MWD(1, 6) 191900.00 8951 172.74 7,453.25 20.90 3.97 49.22 1405 20.80 BID 19.83 66.73 10.12 35.83 MWD(1, 6) 20,000.00 89.51 172.74 7,454.10 20.95 -5.97 50.36 14.29 2093. 6.07 20.06 67.52 1046 35.14 MWD(1, 6) 20,10000 89.51 17274 7,45494 20.99 -5.97 51.51 14.53 2098. BOa 2030 68.33 10.03 34.46 MWD(1. 6) 20,200.00 89.51 172.74 7,45579 2105 -553 52.69 14.76 21.03 6.08 2053 69.16 1132 3378 MWD h. 6) 20,30000 09.51 172.74 7,45864 21.11 -5.97 53.87 15.00 21.09 6.D8 2076 7001 11.82 33.10 MM (1. 6) 21,40000 09.51 172.74 7.457.49 21.18 -5.97 5500 1524 21.16 6.00 21.00 7087 12.03 32.43 MWD(1. 6) 20.500.00 09.51 172.74 7.458.34 21.25 -597 5629 15.47 2123 6.08 21.23 71.75 12.45 31.76 MWD(1, 6) 20.600.00 89.51 172.74 7,459.16 21.33 -5.97 57.53 15.71 21.31 6.08 21.47 72.65 12.98 31.09 Ism (1, 6) 20,700.00 89.51 172.74 7,460.03 21.42 -597 5877 1585 21,40 6.08 21.71 73.57 13.31 3044 MWD(1, 6) 20,000.00 8951 172.74 7,460.06 21.51 397 60.03 16.18 21,49 Us 21.94 74.50 1373 2979 MWD(1, 6) 20,900.00 89.51 172.74 7,481.73 20.98 5.97 48.24 12.64 20.96 6.08 le" 56.00 10.54 36.49 MWD+IFRAK-CM-W(2, 7) 21,000.00 8951 17274 7,45250 21.00 3.97 48.60 12.64 2098 6.08 1961 66.24 10.]1 36.2510 T 1FR-AKCAZ-15C(2.7) 21100.00 09.51 172.74 7,463.43 2103 -5.53 4097 12.84 2101 6.08 19.68 WAS 1089 35.02 MWO+IFR-AK-CAZ-SC(2, 7) 21,20000 09.51 172.74 7,464.27 21.05 -597 49.34 12.64 21.04 608 19.75 66.73 1107 3579 MWD+IFR-Al(-CAZSC(2,7) 21,30000 89.51 172.74 7.465.12 21.08 -5.97 49.72 1264 21.07 609 1982 ".98 11.26 35.56 MM -IFR -AK -CM -SC (2.7) 21,400.00 89.51 172.74 7,465.97 21.12 -5.97 60.10 12.84 21.10 6.09 19.89 67.23 11.45 35.32 MWD+IFR-AK-CAZ4i0(2,7) 21,50000 8951 172.74 7.466.82 21.15 -5.97 50A9 1264 21.13 609 19.97 67.49 11.64 35,09 MWD+IFR-AK-CAZ-SC(2,7) 21,600.0 8951 172.74 7,467.67 21A8 5.97 Was 12.64 21.16 6.09 20.04 67.75 11.84 34.85 MWWIFRAK-CA-SC (2,7) 21,700.0 89.51 17274 7,40051 2122 5.97 51.27 12.64 21.20 6.09 20.11 6001 12.04 34.62 MM+IFR-AR-CA!-SC(2,7) 21,800.00 69.51 17274 7,469.36 21.25 -5.97 5167 12.64 21.21 6.09 20.18 60.27 12.25 34.36 MWDd1'R.M4-0 4C (2.7) 21,900.00 89.51 17274 7,47021 21.29 -597 52.06 12.84 21.27 6.09 20.26 8054 12.46 34.14 MWD+IFR-AK-CM-SC(2,7) 22,00000 89.51 1"74 7,47106 2133 -5.97 52.47 12.64 2131 6.09 20.33 6881 Use 33.90 MWD+IFRAi(-CM-SC(2,7) 221100.00 09.51 1]2.74 7,471.91 21.37 -6.53 $2.87 1284 2185 6.09 20.41 69.08 12.87 3365 MWD+IFR-AK-0AZSC(2,7) 2$200.00 09.51 1]2.74 7,472.76 21.42 -5.97 5320 12.64 21.40 6.53 20.46 6936 13.09 33.42 MWD+1FR-AK-CAZSC(2,7) 2$300.00 89.51 In.74 7,47360 21.46 -5.97 53.69 12.64 21." 8.09 20.55 6964 13.0 33.18 1AWD+IFR-AK-CAZSC(2,7) 2$40000 89.51 172.74 7,474.45 21.50 -5.97 54.11 12" 2149 8.09 20.63 69.92 13.51 3294 MW IFRAK-CAZ-SC(2, 7) 22.600.00 8951 172.74 7,475.30 21.55 -5.97 54.53 12.64 21.53 6.10 20.70 70.20 13.]2 32.70 MW IFR-W-CAZ-W(2,7) 22,600.00 89.51 172.74 7,476.15 21.50 397 54.95 12.64 21.58 6.10 2078. 7049 13.94 32.46 MW IFRM-CA W(2,7) 22.700.00 89.51 172.74 7,477.00 21.65 5.97 55.37 12.64 21,53 5.10 20,88 70.76 14.15 32.21 MWD+IFR-AR-CAZ-SC(2, 7) 22,800.00 69.51 172.74 7,477.84 21.70 -5.97 55.80 1264 21.88 6.10 2093 71.07 1037 31.97 MWD+IFR-AI(-CISSC(2,7) 22,90000 89.51 17274 7,47859 21.75 .5.97 56.22 12.64 21.73 6.10 21.01 7137 14.58 31.73 MWD+IFR-AK-CAZ-SC(2,7) 23000.00 89.51 1]2.74 7,47954 21.81 .5.97 56.66 12.64 21.79 6.10 21.08 71.67 14.80 31.40 FAM+IFR-AK-CM-SC(2,7) 23.100.00 89.51 172.74 7,480.39 21.86 -5.97 5709 12.84 21.84 6.10 21.16 71.97 15.01 3124 MAD+IFR-AK-CAZSC(2,7) 23,200.00 8951 172.74 7,481.24 21.92 -597 57.53 1284 21.90 6.10 21.24 ]2.27 1523 31.00 MWD+11FR-AK-CAZ-SC(2,7) 23,300.00 89.51 172.74 7.482.09 21.97 -597 57.97 12.64 21.96 6.10 21.31 n.58 15" 3015 MWD+IFR-AK-CM-SC(2,7) 23.400.00 89.51 172.74 7,482.93 22.03 -5.97 58.41 12.64 22.02 6.10 21.39 7289 15.65 30.61 MWD+IFR-AK-0AZ-SC(2, 7) 91112017 2:25.33PM Page 7 COMPASS 5000.14 Build 85 Company: ConomPhiliips(Alaska) Inc. -WNS Project: Western North Slope Site: Cl Alpine West Pad Well: Rig: Cl Wellbore: Rig. CD5-316 Design: CD5-316wp16 ConocoPhillips Error Ellipse Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: CD5-316 Cl actual @ 70.44usft (Doyon 19) Cl actual @ 71 (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Position uncertainty and bias at survey station Meavun l Inclinenon AZImuN VMiul H,h8 we Lateral Vertical Wenrtutla Semlmejor sem4minor a m Di Error Biu Error sloe Error Blas of Blas Error Emr Atini M Tool Ban) (1) (9 (1 4-10 lase) arse) (�) (+sn) (vee) (-M (on) (uan) i 23,500.00 89.51 122.74 748378 21.09 -597 56B5 1264 2200 6.10 2147 73.20 15.87 3026 MWDdFR-AK-CA2SC(2,7) 23.60000 8851 1M,74 7,40463 22.15 -5.97 59.30 1284 414 ell 2155 93.51 1600 3002 MNDeIFR-AK-CALBC(2. 7) 23,700.00 89.51 172.74 7,48548 22.22 597 5975 12.64 22.20 6.11 2162 MM 16.29 2978 MWMIFR-AK-CSSC (2. 7) 23,800.00 89.51 172,74 7,486.33 22.28 -5.97 6020 12.64 2226 6.11 21.70 74.15 16.50 29.53 14WDH17R-AK-CA-SC (2,7) 2$900.00 89.51 172.74 7,407.17 22.35 -5.97 W65 12.64 2233 8.11 21 ]8 7648 1670 2929 MWWIFR-AK-CA-SC(2,7) 24,000.00 89.51 172.74 7,400.02 2241 -597 61.10 1284 22.40 6.11 21.86 74.00 16.91 2905 MiC(2,7) 24,100.e0 89.51 172.74 7.480.87 22.48 -5.97 61.56 12.64 22.46 5.11 21.94 75.13 17,12 2881 MM+11FR-AKCA2-SC (2,7) 242110.00 09.51 172.74 7,4s9M 22,55 -5.97 62.02 1284 22.53 6.11 22.02 7645 1732 28.58 MiC(2,7) 24,300.00 09.51 172.74 7,490.57 22.62 -5.97 62.0 12.64 22.60 611 22.09 75.00 17.52 28.32 FMD -IFR -Al -%C(2,7) 24400.00 Kill 172.74 7.49142 Mae -5.97 82.94 12.64 22.67 6.11 22.17 78.13 17.73 2806 MWDa1FR-AKCAZSC(2.7) 24,500.00 89.51 172.24 7,49226 M76 -5.97 8341 1264 M.75 6.11 22.25 7647 17.93 27.84 MWDHFR-AK-CAZSC(2,7) 24.800.00 09.51 17274 7.493.11 22.04 5.97 63.87 12.64 22.82 6.11 MM 76.82 10.13 27.60 MWDHP&AK-OAZSC(2.7) 24,700.00 89.51 17214 7,49398 22.91 597 6434 1264 22.90 6.11 2241 77.16 18.32 27.37 MWDH1FR-AK-CA2-SC(2,7) 24,80000 89.51 172.74 7,494.81 22.99 5.92 8461 1264 22.97 8,12 22.49 72.51 1852 27.13 MWDHFR-AK-CA-SG(2,71 24,900.00 89.51 17274 249566 23.07 -597 6520 12.64 23.05 6.12 22.57 77.86 18.71 28.89 MM+lFR-AKCA-SC(2,7) 25,000.00 8951 17274 7,496.50 23.14 -5.97 65.25 1264 23.13 6.12 22.65 78.21 18.91 26.65 MWDHFR-AK-CAZSC(2, 7) 25,100,00 89.51 122.74 7,497.35 23.22 -597 66.23 12.64 2321 6.12 M73 7857 19.10 26.42 MWWIFWAWCAZSO(2, 7) 25,200.00 89.51 17274 7,496.20 2330 -5.97 88.71 12.64 2329 6.12 22.02 78.92 19.29 26.18 MWDHFR-AK-CA-=(2, 7) 25.300.00 08.51 17274 7,499.05 2339 -597 67.10 1264 23.37 6.12 22.90 7928 19.47 2595 MWWIFR-MC -SC (2, 7) 25400.00 89.51 172,74 7,49990 2347 -597 67.66 1264 2345 6.12 22.98 79.65 19.68 25.72 MWDHFR-MC -SC (2,7) 25,50000 89.51 17274 7.500.75 2355 -5.97 68.14 1264 23.54 6.12 23.08 80.01 19.84 25.49 MWDaIFR-MC -SC (2, 7) 25,60000 09.51 17274 7,50159 2364 -5.97 6883 12,84 23.62 8.12 23.14 80.30 20.03 2526 MWDHFR-AKCA -SG (2, 7) 25,700.00 09.51 172.74 7,50244 2372 5.97 69.11 12.64 23.71 8.12 23.22 W75 20.21 2503 MDHFR-AK-CA -SC (2,7) 25,80000 8951 172.74 7.503.29 23.81 -5.66 69.60 12.64 23.79 6.12 23.30 81.12 20.39 2460 MWDHFR-AKCAZ C(2.7) 25,900.00 89.51 172.74 7,504.14 23.90 -5.97 70.08 12M 23.88 6.13 23.39 81.50 20.57 24.52 MWDHFR-AK-CA-SC(2,7) 26,000.00 89.51 17274 7,504.99 23.99 5.97 7057 12.64 2397 6.13 2347 81.88 20.74 24.35 MWDHFR-AK-CA-SC(2,71 26,100.00 89.51 1M.74 7,505.03 24.00 -5.92 71.06 12.64 2406 6.13 2355 8226 2092 24.12 MWDHFR-AK-CALSC(2.7) 26,20000 89.51 17274 7,50688 24.17 -597 7155 12.64 24.15 6.13 23.63 82.64 21.03 23.90 MWDHFR-AKCA-SC (2. 7) 26.30000 89.51 172.74 7,507.53 24.26 -5.97 M.04 12.64 2424 6.13 23.72 8302 21.26 23.60 MWSHIFR-AK-CA -W (2,7) 26,40000 89.51 17274 7,508.30 2435 -597 7254 12.64 24.M 6.13 23.80 8341 21.43 2348 AM+1i (2, 7) 26.500.00 89.51 172.74 7,509.23 24.45 -597 73.03 1264 24.43 613 23.80 lose 21.59 23.24 MW IFR -M -C -&C (2, 7) 26800.00 Her 17274 7.510.00 24.54 -5.97 73.53 12.64 24.53 6.13 2397 04.19 21,76 2302 MWDHFR-MC -SC (2,7) 26]00.00 89.51 172.74 7,510.92 2464 .5.97 74.02 1284 2462 6.13 2405 04.58 21.92 22.80 AW IFR -MI -SC (2,7) 2618airm 89.51 172.74 7,511.77 2073 -5.97 74.52 1264 DV2 6.13 24.13 mas 22.09 22.59 MWWIFR-AKCKSC(2,7) 26,900.00 89.51 172.74 7,512.82 24,83 -5.97 75.02 1261 24.82 6.13 24.22 85.38 22.25 22.37 MMHFR-AK-C -SO (2,7) 27,00000 89.51 172.74 7,513.47 24.93 -5.97 75.52 12.64 24.91 8.13 24.30 85.78 2240 22.16 MMHFR-AK-CMSC(2,7) 22,10000 89.51 172.74 7,514.32 25.03 -5.97 76.02 12.64 25.01 6.14 2.4.39 86.18 22.58 21.95 MWDaIFR-AKCAZ C(2,7) 27,200.00 89.51 172.74 7,515.16 25.13 587 7652 1264 25.11 6,14 2447 86.59 22.72 21.24 MWDHFR-AK-CALSC(2,7) 22,30000 88.51 172.74 7.516.01 25.23 -5.92 7703 12.64 2522 6.14 24.56 86.99 22.81 21,53 MWDHFR-AK-CA-SC(2.7) 27,400.00 89.51 172.24 7,51698 25.33 5.97 77,53 12.64 2532 6.14 2464 8740 23.02 21.33 MWDHFR-AK-CALSC(2,7) 27,50000 8951 17274 7,517,71 25.44 5.97 70.04 12.64 25.42 6.14 24.73 87.81 23.17 21.12 MWDHFR-AKCA-SG(2, 7) 27.60000 89.51 17274 7,518.56 25.54 .5.97 78.54 1284 25,52 6.14 24.81 8822 2332 20.92 MWDHFR-AWCAZSC(2, 7) 2770000 89.51 172.74 7.519.41 25.64 -597 79.05 12.64 25.63 6.14 24.90 0864 23.47 20.72 MWDHi(2, 7) 27.800.00 8951 17274 7,520.25 2575 -5.97 79.55 12.64 25.73 6.14 24.911 09% 23.61 20.52 MWDHFR-MC -SC (2 7) 27,005.53 89.51 17274 7,520.30 25.78 -5.97 79.59 12,64 25.74 6.14 24.99 89.00 23.62 2050 WW IFR -MC -SC (2 7) 27.881.10 90.01 173.31 7,520.62 2582 5.15 80.32 12.43 25.82 6.14 25.05 89.38 23.71 2037 WW IFR -MK -SC (2, 7) 27,90000 90.01 173.31 7,520.61 2584 5.15 80.41 12,43 25.94 8.14 25.07 89.45 2373 20.33 MWOH1FR-AKCMSC (2,7) 28,000.00 90.01 173.31 7,520.60 25.95 5.15 80.92 12.43 2595 6.14 25.15 89.88 23.87 20.14 MWD+lFR-AK-CA -SC (2, 7) 28,100.00 90.01 173.31 7,520.58 26.06 5.15 81.43 1243 26.08 8.14 2523 90.30 24.01 19.95 MWDHFR-AI(-C7 -SC (2,7) 28,200.00 90.01 173.31 7,520.57 26.18 5.15 8194 12.43 26.16 6.14 25.32 90.23 24.15 1975 MWDHFRAWCA-SC(2, 7) 28,30000 90.01 173.31 7,520.55 26.27 5.15 0245 12.43 2827 8.14 25.40 91.15 2428 19.56 MWDHFR-AK-CAZSC(2,7) 28,400.00 90.01 173.31 7,520.54 26.38 5.15 6297 12.43 2630 6.14 2540 9159 2442 19.38 11AWDHFR-AKCA-SC (2,7) 28,500.00 90.01 1M31 7,520.53 26.49 5.15 0348 12.43 2849 8.14 25,57 92.02 24.55 19.19 MWDHFR-AK-CA-W(2,7) 20,60000 Nor 17231 7,520.51 28.61 5.15 83.99 12.43 nee 6.14 2565 92.45 24.68 19.00 MWDHFR-M-CA-SC(2.7) 9/11/2017 2..25:33PM Page 8 COMPASS 5000.14 Build 85 Company: ConomPhillips(Alaska) Inc -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig'. C05-316 Wellbore: Rig', CD5-316 Design: CD5-316wpl6 Position uncertainty and bias at survey station Conocolphillips Error Ellipse Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: CD5-316 CD5-316 actual @ 70.44usft (Doyon 19) CD5-316 actual @ 70.44usit (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Measumd Indisnton KimNa Venice' Hgbsitle uhnl -Shape (°) Wince] (usft) Ma9nkude Semim'j 9emlminor cem 0.00 7,520.30 -20,982.75 Depth E. Blas Enor swa Error Bias 41 BMs Eno, Error Azunu Tod (.n) 1'1 (°1 (usft) lust (um) (w ) (ural (urn) loan) (t ) lural loos` (') 2870000 9001 173.31 7.520.50 26.72 6.15 6451 1243 26]2 6.14 2573 9289 2481 18.82 MMHFR-AK-C ZSC(2, 7) 28,80000 90.01 173.31 7,520.40 26.83 -6.15 85.02 12.43 M83 6.14 2552 93.32 24.94 10.64 MM+IFR-AK-OAZ40(2, 7) 28.90:X0 80.01 173.31 7,520.47 2695 5.15 05.51 12.43 26.95 614 25.90 9376 2586 1846 MAD.11FR-AK-CAZ-SC(2, 7) 29.0000 90.01 173.31 7,520.45 2786 4iA5 86.06 12.43 27.08 6.14 25.99 9420 26.19 1928 MW IFR-AK-CA-SC(2, 7) 2$0116.64 90.01 173.31 7,52044 27.18 5.15 8851 1243 27.16 6.14 26.06 9459 25.30 18.12 MW IFR -AK -CP -W(2, 7) Design Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI -S +EI -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) .s(,. Latitude Longitude C105-316 02. Toe 09071' 0.00 0.00 7,520.30 -20,982.75 -9,462.87 5,944,794.00 1,479,401.00 70° 15'21.870 N 1510 165.053 W - plan hits target center C) 2,360.00 2,176.50 13318" 13-318 - Circle (radius 100.00) 13,838.00 6,068.14 95/8" 9-518 12-1/4 CD5-316 03. 1k D91117 0.00 0.00 7,520.44 -22,255.09 -9,313.22 5,943,519.00 1,479,525.00 70° 15'9.358 N 151° 18'0.654W - plan hits target center 4-1/2"x6-1/8" 4-1/2 6-1/8 7,520.30 -20,982.75 - Circle (radius 100.00) Start 1°/100' DLS, 49.15° TF, for 75.57' 27,881.10 7,520.62 -21,057.76 -9,453.69 Casing Points -- Measured Vertical Local Coordinates Casing Hole Depth Depth +EPW Diameter Diameter (usft) (usft) Name f9 C) 2,360.00 2,176.50 13318" 13-318 16 13,838.00 6,068.14 95/8" 9-518 12-1/4 19,336.00 7,445.75 7" x 8-1/2" by 9-7/8" 7 9-7/8 29,066.64 7,520.44 4-1/2"x6-1/8" 4-1/2 6-1/8 Plan Annotations Measured Vertical Local Coordinates Depth Depth +NI -S +EPW (usft) (usft) (usft) (usft) Comment 19,276.96 7,443.54 -12,526.50 -10,550,41 Adjust TF to 0°, for 57.04' 19,336.00 7,445.75 -12,582.43 -10,539.47 Adjust TF to 0°, for 20' 19,356.00 7,446.52 -12,602.05 -10,535.63 Start 3°/100' DLS, 65.56° TF, for 139.41' 11 7,449.82 -12,739.60 -10,513.44 Hold for 8310.12' 27,805.53 7,520.30 -20,982.75 -9,462.87 Start 1°/100' DLS, 49.15° TF, for 75.57' 27,881.10 7,520.62 -21,057.76 -9,453.69 Hold for 1205.54' 29,086.64 7,520.44 -22,255.09 -9,313.22 TD: 29081 7520.44'TVD Checked By: Approved By: Date: 9/112017 2:25:33PM Page 9 COMPASS 5000.14 Build 85 Pool Report 21 7000 -21 -35000 CD5-316wp16 Quarter Mile View -28000 -21000 -14000 -7000 0 7000 14000 +mOR 35000 0 I CD6-316PB1 go *I m CD5-316wp16 Surface Location I M CPAICoordinate From: Datum: NAD83 - 1 Region: alaska Latitude/Longitude Decimal Degrees r UTM Zone: F__ r South r State Plane Zone: 1q � Units: us -ft r Legal Description [NAD27 only) To: .... ----. ..._.. _ Datum: NAD27 Region: alaska + • LatitudelLongitude Decimal Degrees • UTM Zone: True r South 4:' State Plane Zone:q Units: us -ft r Legal Description (NAD27 only) Starting Coordinates; Ending Coordinates: X: 11489283.58 X 349250.430131659 Y; 15,965580.48 Y: 5965834.51975506 Transform Quit Help �D5-316wp16 Surface Casing I [� CPAI Coordinate Converter [ o i C -i I ---i 1 Datum: NAD83 , Region: alaska r Latitude/Longitude IDecimalDegrees f UTM Zone: r South C• StatePlane Zone:r Units: uTf r Legal Description (NAD27 ordy) To:_—.._-_ Datum: NAD27 Region: alaska r Latitude/Longitude iDecimalDegrees a UTM Zone: TNe r South C State Plane Zone: F__-] Unils: usFt f' Legal Description (NAD27 only) Starting Coordinates:-- -Ending Coordinates: X: 11488876.45 Y: 15964992.86 Transform X 348843.27037318 Y. 5965246.98850801 quit Help 65-316wp16 Intermediate Casing I Q CPA[ Coordinate Converter _ c O I�wtrl From:...-_.. — - Datum: F683 --D Region: alaska r Latitudekongilude IDecimalDegrees, C UTM Zone: r— r- South %Slate Plane Zone: rd ,{ Units: usft r Legal Description (NAD27 only)) To _ Datum: NAD27 Region: alaska r Latitude/Longitude iDecimalDegrees * UTM Zone: True r South C State Plane Zone: )" J Units: u f r Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: X 11481104.75 X: 1341071.162482555 Y. 5957581.34 Y: 5957835.63595405 _Tanslorm ; quit Help D5-316wp16 Intermediate Casing 2/Production Horizon r3 CPA] Coordinate Ccn.e¢er From: Datum: NAD83 Region: alaska r Latitude/Longitude Decimal Degrees e r UTM Zone:I — j South r State Plane Zone: Units: us ft C' Legal Description (NAD27 only) i To Datum: NAD27 Region: jalaska t` Latitudekongitude IDecimalDegiees * UTM Zone: True r South {7 Stale Plane Zone: 1" _-3 Units: C Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates. X 1478493.78 X: 338459.975589552 Y: 5953213.66 Y. 5953468.0375284 Transform quitHelp D5-316wp16 TD FZ CPA! Coordinate Converter _To: i Datum: Np,D83 j Region: alaska Datum: NAD27 Region: alaska . 3 f LatitudeAongitude Decimal Degrees r Latitude/Longitude Decimal Degrees r UTM Zone:f- i South f UTM Zone: True r South I C•' State Plane Zone: q Units: us -It %' Stale Plane Zone: �3 Units us -ft r Legal Description (NAD27 only) I i r Legal Description (NAD27 only) I F- Starting Coordinates: Ending Coordinates: X: 1479525 X: 339490.810676669 Y: 15943519 Y: 15943773.27250447 _ Transform Quit Help W5-316wp16 Surface Location I ® CPAf Coordinate -From.---_--_- Datum: NAD83 Region: alaska i- Latitude/Longitude Decimal Degrees C UTM Zone: F! r- South fi State Plane Zone:q Units: us -ft C Legal Description (NAD27 only) Starting Coordinates: X: 11489283.58 Y: 5965580.48 -316wp16 Surface M CPASCoordinate Ccn.erte• Datum: NAD27 Region: alaska {` Latitude/Longitude Decimal Degrees r UTM Zone: FTrue r— South (" State Plane Zone: [4----,l Units: urft ice` Legal Description (NAD27 only) Legal Description Township: 011 I" J Range: 004 E Meridian: rU rl Section: 18 FNL 379.60508 FEL 2727.5022 Transform Quit Help From: Datum: NAD83Region: alaska Zj r LatitudelLongitude Decimal Degrees t" UTM Zane: r_ F South r� Stale Plane Zone: F__'3 Units: urfl r Legal Description(NAD27ar,y) r -Starting Coordinates: k 1488876.45 Y: 5964992.86 To. Datum. NAD27 Region: jalask. C Latitude/Longitude IDecimalDegrees C UTM Zone: True r South f State Plane Zone: Units: usdt T Legal Description (NAD27 only) -Legal Description Township: 011 t"J Range: 004 1`.J Meridian: fu-----,lSection:18 FSL 14304,6580 FEL 1 3125.1185 --_Transform __ j Quit Help O5-316wp16 Intermediate Casing I n CPAI Coordinate Converter Oq*VVj li Datum:N,gpg3 Region: alaska r Latitude/Longitude Decimal Degrees - f UTM Zone: F- r South R State Plane Zone'- . Units: uslt . (" regal Des�ription(ta4D27 W)j Datum: NAD27 Region: alaska . r Latitude/Longitude IDecimal Degrees f UTM Zone: True r South !" State Plane Zone: I' =i Units: us -ft C Legal Description (NAD27 only) Starting Coordinates: i Legal Description --- - X 11481104.75 Township: 011 MN , Range: o03 !` Y: 5957581.3A Meridian r� Section:.23 FSL 112014.0211 FEL 533.34393 L _ Transform QUt Help D5-316wp16 Intermediate Casing 2/1"roduction Horizon ®. CPAI Coordinate Converter r, -Flom: To i Datum: NAD83 Region: alaska . j Datum: NAD27 Region: alaska • Latitude/Longitude Decimal Degrees i Latitude/Longitude Decimal Degrees • UTM Zone: r._ r South r UTM Zone: True r South G State Plane Zone: F-3- Units: us.ft r State Plane Zone: Units: us.ft i Lega!Descriprinn (NAD27 rn!y G Legal Description[NAD27 only) Staling Ceoidinales. --� X 1478493.78 Legal Description --,l Township: 011 FN Range: 003 Y 5953213.66 Meridian I" J Section 26 FSL 2871.4625 FEL 3055.2161 Help �D5-316wp16 TD M CPA1Coordin3te Convener From:_______—__— ____ To. Datum: NAD83 Region: alaska Datum: NRegion alaska AD27 (" Latitude/Longitude IDecimalDegrees `� r Latitude/Longiilude IDecimelDegrees r UTM Zone: F— r South C UTM Zone: True r South f• State Plane Zone: Units: usft C State Plane Zone: r4� Units: us -ft r Legal Description (NAD27only] r Legal Description (NAD27 only) Starting Coordinates: X: 1479525 Legal Description --- 1 Township: 010 I"J Range: 803 I°=1 Y: 15943519 Meridian IV - 7, Section:r2— F9L 3759.9329 FEL 1827.0887 E L s Transform c Quit Help Tollerable Collision Risk Worksheet As -built REV I DATE I BY I CK APP DESCRIPTION IREVI DATE 5/2/161 I BY CZ I C4 APP I DESCRIPTION i GD C.A. UPDATED PER K160003ACS 114/24/15 1 CZ I DB I C.A.1 UPDATED PER K150003ACS 1 2 ALPINE SATELLITE DEVELOPMENT LOCATION OF THIS SURVEY T12 I cD-5 PAD Q 11N - CD4 TO ALPINE C05 ' h „<M�"" ACCESS ROAD CD N 0 MD LL IT CD1 iP VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 18, T. 11 N., R. 4 E., U.M. I? CD -5 p�pER OF ��QoN PAD SNO SSVgoo 1 x n�Q O NXni'������w"'L.C�5o4••••••, (.QtOT tOT��NI�nNO PLANT N N to NOTE: 15.4 52• CONDUCTOR CD5-x14 WAS PLUGGED AND o� ABANDONED LCMI APRIL 2016. Z� KUUKPIK `Z UMIAQ ALPINE SURVEY OFFICE PHONf :90)-6]Od]39 vel ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS—BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 1 OF 3 2 11 14/24/15 1 CZ I DB I C.A.I UPDATED PER K150003ACS 12 15/2/161 CZ I GD I C.A.I UPDATED PER K160003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. WELL Y' X' LAT. (N) LONG.(W) SFNLINEFWLS GND EXIST. CD5-x99 5,965,666.90 1 489 591.67 1 70' 18 49.211 151' 13 20.820 287 2508 27.5 33.9 CD5-x01 5,965,661.64 1 489 572.44 2016. 70' 18 49.155 151' 13-21.-378" 293 2489 27.6 34.1 CD5-x02 5,965,656.28 1 489 553.29 70' 18 49.099 151' 13 21.934 PROJECT 299 2470 28.1 34.1 C05 -x03 5,965,650.92 1 489 534.00 Alaska, Inc. 70' 18 49.042 151' 13 22.493 CADD FILE NO. 15-03-02-1 04/18/2015 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1 489 514.77 70' 18 48.982 151' 13 23.051 311 2432 26.6 34.2 CD5-x05 5,965,639.80 1 489 495.46 70' 18 48.925 151' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1 489 476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151' 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1 489 437.69 70' 18 48.757 151' 13 25.287 334 2355 28.1 34.3 CD5-x09 5.965.618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 5 965 613.12 1,489,399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1 489 379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489 360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965,596.59 1 489 341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 885-x14 -5- +-4o9-sci, -;� 368- 3zZ 27-6 34.2- CD5-14X 5,965,589.94 1 489 317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1 489 283.58 7 0' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5.965.575.11 1 489 264.31 70' 18 48.243 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5.965.569.79 1 489 245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965,553.51 1 489 187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5,955,548.14 1 489 168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1 489 148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1 489129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1 489 110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5.965.526.59 1 489 091.09 70' 18 47.732 151' 13 35.340 438 2010 26.3 33.7 5 965 521.20 1,489,071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 5 965 515.81 1 489 052.48 70' 18 47.618 151' 1336.460 449 1972 27.4 33.6 5 965510.40 1 489 033.34 70' 18 47.561 151' 13 37.015 455 1953 27.6 33.6 KD53 5 965 504.97 1 489 014.02 70' 18 47.504 151' 13 37.575461193425.333.6 5 965 499.57 1 489 994.73 70' 18 47.447 151' 13 38.135 467 1915 26.6 33.6 5 965 494.13 1 488 975.45 70' 18 47.390 151' 13 38.694 473 1895 26.8 33.6 5,965,488.75 1 488 956.35 70' 18 47.333 151' 13 39.248 478 1876 27.0 1 33.6 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 63. KUUKPIK 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM (B. P. M. S. L.) MEAN SEA LEVEL / / x� U M I A Q 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. ALPINE SURVEY OFFICE PHONE:90]-6]Pd]39 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. 15-03-02-1 04/18/2015 DRAWING NO: 1 CE-CD50-1025 PART: 1 1 OF 3 REV: 2 Haagen Dazs Necessary Plan Request (NPR) Appendix ■ Tier 1: Standard ■ Intervals without issues noted for Tier 2 or 3 ■ Tier 2: Challenging Orientation ■ Drilling within 30° of horizontal inclination AND drilling within 30' of magnetic East/West azimuth in extreme northern or southern locations ■ Tier 3: Critical Steering ■ Driller's Target of 50' Radius or Less ■ Lease line constraint ■ Small Geologic Target ■ Failure of Major Risk Rule (Close Approach) ■ Defined during directional planning, based on the positional uncertainty ■ Theoretical intersection of the path of the well being planned with an offset well ■ If HSE risks are eliminated, the Tolerable Collision Risk assessment can be implemented ■ Tier 4: Single section containing both Tier 2 and Tier 3 challenges 6 gs ;�sa;:sss:.:s s sass a £s s:ii3i9Bii 'a' ConocoPhiliips ■ Tier 1 (Standard): ■ Directional interval across which no special mitigations are needed ■ Tier 2 (Challenging Orientation): ■ Increase non-magnetic insulation of MWD tool in the BHA ■ Take rotational check shots and/or increase survey frequency at the start of a BHA run ■ Alter well directional plan, if feasible ■ Consider gyro surveys where feasible ■ Tier 3 (Critical Steering): ■ Increase survey frequency across critical interval ■ Increase correction frequency across critical interval ■ Take rotational check shots and/or increase survey frequency if the critical interval is at the start of a BHA run ■ Define escalation based on deviation from plan ■ Minor Risked close approach intervals with a high financial or scope risk should strongly consider the use of relevant mitigations ■ Tier 4 (Critical Steering & Challenging Orientation): ■ Consider all Tier 2 & 3 mitigations :a.s•.:irsg 7 ConocoPhilli s ;iliii£gj}i;j��ai P Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, September 14, 2017 7:01 AM To: Dai, Weifeng Subject: Re: [EXTERNAL]RE: [EXTERNAL]RE: [EXTERNAL]FW: CD5-316 (PTD #217-040) TD Extension Verbal approval is granted for the revised drilling PTD 217-040 Thanx, Victoria Sent from my iPhone On Sep 13, 2017, at 3:31 PM, Dai, Weifeng <Weifeng.Dai@conocophillips.com> wrote: We start drilling lateral this morning, we need your approval as soon as you can. BLM already orally approve the sundry. Could I get your oral approval first? Sent from my iPhone On Sep 13, 2017, at 2:55 PM, Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> wrote: I have the permit now. What's the status of drilling? From: Singh, Angela K (DOA) Sent: Wednesday, September 13, 2017 12:42 PM To: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]RE: [EXTERNAL]FW: CDS-316 (PTD #217-040) TO Extension Hi Weifeng, Just letting you know that you emailed me instead of Victoria... Ccing her so she's in the loop. O Thank you, Angela From: Dai, Weifeng[mailto:Weifeng.Dai@conocophillips.com] Sent: Wednesday, September 13, 2017 12:41 PM To: Singh, Angela K (DOA) <angela.singh@alaska.gov> Subject: Re: (EXTERNAL]RE: [EXTERNAL]FW: CD5-316 (PTD #217-040) TD Extension Morning Victoria, Have you gotten a chance to review the permit? Sent from my iPhone On Sep 12, 2017, at 11:19 AM, Singh, Angela K (DOA) <aneela.singh@alaska.eov> wrote: No worries! O Thank you Angela From: Dai, We!feng[mailto:Weifeng.Dai@conocophillips.com] Sent: Tuesday, September 12, 2017 11:17 AM To: Singh, Angela K (DOA) <aneela.sineh@alaska.gov> Cc: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haeeertv- Sherrod@contractor.conocophiIIips.com> Subject: Re: [EXTERNAL]FW: CD5-316 (PTD #217-040) TD Extension Sorry Angela, it is weird that the form is out dated, I edit it over the one that submitted last month. Anyway, I will double check next time. Sent from my Phone On Sep 12, 2017, at 10:17 AM, Singh, Angela K (DOA) <aneela.sineh@alaska.eov> wrote: Good morning Weifeng, Just a reminder for future submissions... please submit any 10-4xx forms on the current form. This one arrived using the form revised 1 1 /2015, while we have a more recently updated form on our website. This time, we will be able to accept this outdated form for this revised application today. Thank you, Angela Singh Office Assistant II Alaska Oil and Gas Conservation Commission 333 W. 7m Ave. Anchorage, AK 99501-3572 907.793.1230 (phone) 907.276.7542 (fax) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake In sending it to you, contact Angela Singh at (907) 793-1230 or angela.singh@alaska aov. From: Loepp, Victoria T (DOA) Sent: Tuesday, September 12, 2017 9:10 AM To: Bettis, Patricia K (DOA) <patricia.bettis@alaska.gov> Cc: Singh, Angela K (DOA) <angela.singh(a@alaska.gov> Subject: FW: CD5-316 (PTD #217-040) TD Extension Patricia, Another revision — lateral extension- will be submitted this morning. Angela, Please route this PTD Revision to Patricia as soon as it arrives. Thanx, Victoria From: Dai, Weifeng [mailto: Weifeng. Dai@conocophillips.comj Sent: Tuesday, September 12, 2017 5:35 AM To: Loepp, Victoria T (DOA) <victoria.loepp@a la s ka.gov> Subject: CD5-316 (PTD #217-040) TD Extension Morning Victoria, ConocoPhillips intends to extend the TD of CD5-316. The reason for the extension in lateral length is for potential sand body extension which we have seen in offset well lately. I am printing hard copy of the attached and will send your way for review and approval. Please let me know if you have any questions. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 <l. C135-316 Extended TD AOGCC PTD.docx> <2. CD5-316 10-401.xlsx> TRANSMITTAL LETTER CHECKLIST WELL NAME: li . PTD: OW -00 Development Service _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: Cc1�u�E �tVE.r POOL: aUt `i ky6r RAMIE () t I Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- -_ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well V/ Pilot Hole name ( ce.�k CD - )gyp H) and API number (50 -tui (a0"1<jkp_-_3 b --at,)J from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Como n Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of wed until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Comnanv Name) must contact the AOGCC to obtain advance approval of such water well testing pro Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: � Well Logging Requirements / Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 PTD#:2170400 Company CONOCOPHILLIPS ALASKA, INC. _. _. Initial Class/Type Well Name: COLVILLE_RIV UNIT CD5-316 — Program SER Well bore seg SER / WAGIN GeoArea 890 _. _ Unit 50360 On/Off Shore On Annular Disposal Administration 17 Nonconven. gas conforms to AS31.05.0300.1..A),0.2.A-D) NA 1 Permit fee attached NA 2 Lease number appropriate Yes Fee00NPRA4, Surf; AA0092347; AA0092344; AA0081817, Top Prod;. AA0094165; AA0094167, TD... 3 Unique well. name and number Yes CRU CD5-316 and.CDS-316PH-1. Planned pilot hole to be drilled to locate top Kuparuk C & assess pay thickness 4 Well located in a. defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by Conservation Order No. 443C. _ 5 Well located proper distance from drilling unit boundary Yes CO 443C contains no spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO 443C has no interwell spacing restrictions. 7 Sufficient acreage. available in. drilling unit Yes _ 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes Wellbore will be more than 500' from an external property line where ownership or landownership changes. 10 Operator has. appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative. approval Yes PKB 9/13/2017 _ 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and. strata authorized by Injection Order # (put 10# in comments) (For Yes AIO 18D. _ 15 All wells within 1/4 mile area of review identified (For service well only) Yes No wells within 1/4 mile radius. Closest well is CD5-314x more than 1 mile away. 16 Pre -produced injector: duration of pre -production less than 3 months. (For service well only) No Well will be flowed back for clean-up only. (Earhart:. 3/22/17). 18 Conductor string provided Yes 79' conductor set Engineering 19 Surface casing protects all known USDWs Yes 2445' and 20 CMT vol adequate to circulate. on conductor & surf csg Yes 158% excess 21 CMT vol adequate to tie-in long string to surf csg. _ No 22 CMT will cover all known productive horizons No Productive interval will be completed with uncemented pert pup. liner 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved NA _ 26 Adequate. wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations Yes Diverter waiver granted; 2- AAC 25.035(h)(2) _ Appr Date 28 Drilling fluid. program schematic .& equip list. adequate_ Yes Max formation pressure is 3350 psig(8.7 ppg EMW); will drill w/ 9.0-11.0 ppg EMW VTL 9/18/2017 29 BOPEs, do they meet regulation Yes 30 BOPE.press rating appropriate; test to (put psig in comments)_ Yes MPSP is 2606 psig; will test BOPS to 3500. psig 31 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) Yes No wells within 1/4 mile radius 35 Permit can be issued w/o hydrogen sulfide measures No H2S measures required. Geology 36 .Data. presented on potential overpressure zones Yes Expected reservoir pressure is 8.8-9.0 ppg EMW; will be drilled using 9.0 to 11.0 ppg mud. Appr Dale 37 Seismic analysis of shallow gas zones NA Horizontal production interval to be drilled using 9.0 ppg mud. T csg. shoe to be set at 18,789' MD. PKB 9/13/2017 38 Seabed condition survey (if off -shore) NA Top Kuparuk C sand. estimated at 18,748' MD. 39 Contact name/phone for weekly progress reports [exploratory only] NA Onshore service well to be drilled. Geologic Engineering Public Revision: Change in maximum pore pressure and MPSP. 7/6/17 VTL Revision 2: Extended depth of well to 29087' MD. 9/18/17 Commissioner: Date: CoDate ^7 Commissi Date VTL mmissioner: THE STATE °fALASKA GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Colville River Field, Alpine Oil Pool, CRU CD5-316 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-040 revised Surface Location: 380' FNL, 2728' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 248' FNL, 1977' FEL, SEC. 2, T10N, R3E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for permit to drill the above referenced service well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name CRU CD5-316PH and API number 50-103-20756-70- 00 from records, data and logs acquired for well CRU C135-316 Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Wr—*� Hollis S. French Chair DATED this '4 day of July, 2017. STATE OF ALASKA RECEIVED Revised AL nA OIL AND GAS CONSERVATION COMMIb�,10N PERMIT TO DRILL JUL 06 2017 20 AAC 25.005 1a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas Service - WAG ❑✓ ' Service - Disp ❑ ell is proposed for: Drill , ❑� Lateral ❑ Stratigraphic Test ❑ Development -Oil ❑ Service - Winj ❑ Single Zone ❑� • Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑' Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 CRU CD5-316 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27824 TVD: 7521 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 380' FNL 2728' FEL Sec. 18 T11 N R4E, UM • ASRC-NPR4, Aao92347, AA092344AA08181/, AA094165, AA094167 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1849' FNL 3139' FEL Sec. 26 T11 N R3E, UM 932669, 340758, 340757, 932552, 388808, 368808 7/15/2017 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 248' FNL 1977' FEL Sec. 2 T10N R3E, UM 15912, 1280, 3122, 2525, 5120, 2556 5031' to AA081797 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.8 • 15. Distance to Nearest Well Open Surface: x-349250 y-5965835 Zone -4 ' GL Elevation above MSL (ft): 34 to Same Pool: 5,800' from CD5-314X 16. Deviated wells: Kickoff depth: 400 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3350 • Surface: 2606 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 79 36 36 115 115 10 yds. 16" 13.375" 68 L-80 H-563/BTC 2409 36 36 2445 2185 1175 sx 11 0 ppg DeepCmts, 328 sx 15.8 ppg G 12.25" 9.625" 40 L-80 BTC -M 11950 2000 1891 13950 6041 974 sx 12.2 ppg G; 217 sx 15.8 ppg G 8.75" 7.0" 26 L-80 HYD563 18753 36 36 18789 7439 173 sx 15.8 ppg G 6.125" 4.5" 12.6 L-80 TXP 9200 18600 7422 27800 7521 uncemented pert pup liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD ft: Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 A/AC/ 25.050 rree7quirements❑✓ 21. Verbal Approval: Commission Representative: Dale 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Weifeng Dai 263-4324' be deviated from without prior written approval. Contact 4 " weifeng. dai(cD-cop. com Email Printed Name Chip Alvord �� Title Drilling Manager K`e btd✓� Signature Phone 265-6120 Date Commission Use Only Permit to DrillAPI Number: Permit Approval See cover letter for other Number: 217-040 {' j�d 50- - - - Date: I requirements. Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: pP tCSt to 350c) P S r Samples req'd: Yes ❑ No[✓ Mud log req'd: Yes❑ No[Z f}nn��ar�I'C✓lva�CZ tc5 to ZsDOpS,q H2Smeasures: Yes[Z No❑ Directional svyreq'd:Yes 2'Non ✓ C• r Vice ran-tC ,-,( rX j�✓crtvwa i 2 0 C O 3,$ ( k � � 2 � Spacing exception req'd: Yes ❑ No L4 Inclination -only svy req'd: Yes ❑ o u PC r A29 7 5-J Lan d, t�'o n3 for rDnni., q Sonia to for �n $Crw rcl /atC Post initial injection MIT req'd: Yes o❑ d f -/w2 ll %DZ r— 1-c Yrn,'. q J at✓t q C. C� . C1 G of !7r-Vd(1Cf,'✓C rotCrvqf ODt,5j'Jzz Q{-Cf7e- ✓'G QYYa. d' -n/cc tro✓1 ordtr rt�l. /`rcd Prf'Or j -o C+" _JWe)1. J c/ APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: r 10-401 (Revised 11/2015) i p rmit is valid for 24 f t of oval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate �,�� a �� �,�- � � nRi 1�NAtmonths CRU CD5-316(PTD 217-040) Conditions of Approval: Approval is granted to run the LWD-Sonic on upcoming well CRU CD5-316 with the following provisions: 1. CPAI will provide a written log evaluation/interpretation to the AOGCC along with the log as soon as they become available. The evaluation is to include/highlight the intervals of competent cement (and lengths) that CPAI is using to meet the objective requirements for annular isolation, reservoir isolation, or confining zone isolation etc. Providing the log without an evaluation/interpretation is not acceptable. 2. LWD sonic logs must show free pipe and Top of Cement, just as the a -line log does. CPAI must start the log at a depth to insure the free pipe above the TOC is captured as well as the TOC. Starting the log below the actual TOC based on calculations predicting a different TOC will not be acceptable. 3. CPAI will provide a cementjob summary report and evaluation along with the cement log and evaluation to the AOGCC when they become available 4. CPAI will provide the results of the FIT when available. 5. Depending on the cement job results indicated by the cement job report, the logs and the FIT, remedial measures or additional logging may be required. ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 July 5'", 2017 Alaska Oil and Gas Conservation Commission 333 West 71^ Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Revise Permit to Drill CRU CD5-316 Dear Sir or Madam: ConocoPhillips JUL 0 6 2017 AC)GCC ConocoPhillips Alaska, Inc. hereby applies for a Revised Permit to Drill an onshore water -alternating -gas (WAG) injection well from the CD5 drilling pad. The intended spud date for this well is July 15', 2017. The reason for the revised part in the approved PTD (PTD # 217-040) is mainly due to the lower predicted pore pressure in prodution sand than what was stated in the approved PTD submitted a few months ago as the rig schedule change and reservoir pressure management plan. ConocoPhillips intends to change the following in the attached revised drilling program: 1. Page 9, step 11, ConocoPhillips intends to lower the minimum acceptable LOT/FIT to 12.0 ppg EMW at 13-3/8" surface casing shoe, ConocoPhillips still plan to max FIT at 18.0 ppg EMW just for fracture gradient data acquisition purpose. 2. In page 9, step 21, ConocoPhillips apply to lower the minimum acceptable FIT to 12.5 ppg at 9-5/8" intermediate 1 liner shoe and we plan to stop FIT at 12.5 ppg EMW since this well is not a candidate well for annular disposal. 3. In page 9, step 13, ConocoPhillips plan to add NEU/DEN/NMR log in 12-1/4" intermediate 1 section, and in step 22, add NEU/DEN log in pilot hole. 4. In page 9, step 10 and step 20, test casing pressure to 3,000psi other than 3,500psi. The updated predicted pore pressure is 3,350 psi which is lower than the originally predicted pore pressure and result in lower anticipated surface pressure. 5. In page #10 and #28, lower to mud weight for production section to 9.0 ppg due to depleted pore pressure. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. The approved Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a) 2. A revised proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 ACC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Weifeng Dai at 2634324 (weifent=_.dai(acop.com) or Chip Alvord at 265-6120. Sincerely, cc: CD5-316 Well File / Ann Haggerty -Sherrod ATO 1530 Johnson Njoku ATO 1720 Chip Alvord ATO 1570 Weifeng Dai Jason McLennan ATO 1790 Drilling Engineer Lanston Chin Kuukpik Corp STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 / ✓f RECEIVE® MAR 2 0 2017 1a. Type of Work: Forrn 10.401 ( vised IV2015) a from the date of approval 20 AAC 25.005 D Ef PUCATE I lb. Proposed Well Class: Exploratory - Gas LJ Service- WAG Service!- Disp ❑ 1c, S ;gWed for: Drill Q Lateral 01 Shaligraphic Test❑ Development -Oil ❑ Service- Wmj ] Single Zone 2 Coalbed Gas Gas Hydrates❑ Redn71❑ Reentry❑ Exploratory-OII ❑ Development -Gas❑ Service -Supply Ll Mulliple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑' Single Well ❑ 11. Well Name and Number: ConocoPhinips Alaska, Inc. Bond No. 59-52-180 CRU CD5-316 3. Address: 6. Proposed Depth: 12. FieidlPcol(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27824 TVD: 7521 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 380'FNL 2728'FEL Sec. 18 T1 IN R4E, UM ASRC PR4. AAd92347, AA092344AA081817, AA094165. AAOe4167 Tap of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Dale: 1849' FNL 3139' FEL Sec 26 T11 N R3E, UM 932669, 3407511, 310757, 93455; 368606, 365608 5/15/2017 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 248' FNL 1977' FEL Sec. 2 TION R3E, UM 15912, 1280, 3122, 2525, 5120, 2556 5031' to AA081797 4b. Location of Well (Stale Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.8 15. Distance to Nearest Well Open Surface: x-349250 y- 5965835 Zone- 4 GL Elevation above MSL (q): 34 to Same Pool: 11,512' from CD5-315 16. Deviated wells: Kickoff depth: 400 feel 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 4070 Surface: 3326 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks HoleCasing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42° 20" 94 H-40 Welded 1 79 36 36 115 115 10 yds. 16` 13.375" 68 L-80 H-563/BTC 2409 36 36 2445 2165 1175 sx 11.0 ppg D,xpCrete, 328 sx 15e ppg G 12.25" 9.625" 40 L-80 BTC -M 11950!E2000 1891 13950 6041 974 sx 12.2 ppg G; 217 sx 15.5 ppg G 8.75" 7.0' 26 L-80 BTC -M 18753 36 36 18789 7439 173 sx 15.a ppg G 6.125' 4.5" 12.6 L-80 TXP 920000 7422 27800 7521 uncemented perf pup liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MID (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program ❑✓ Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Skelch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements❑+ 21. Verbal Approval: Commission Representative: Date rid 3Qo./% 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Will Earhart 265-1077 be deviated from without prior written approval. Contact Williarn.C. Earhart(rDcoo.corn Email Printed Name Chip�All�vord Title Drilling Manager Signature 4&1 Phone 265-6120 Date ;124* Commission Use Only Permit to Drill CI API Number:/ Permit Approval See cover letter for other Number: 02 - 7 50-1o3_ Q SV - 0 _00 Date: requirements. Conditions of approval: If box is checked, well may not be used to explore for, test. or produce coalbed methane, gas hydrates, or gas contained in shales: Eir Other. �40' /2 f C$ -t tb 3✓ 574' 0 r� fZ-' -s Samples req'd: Yes ❑ Nou e�-�g7,S� easures: Yes Fd No,❑-/ Mud log mq'd: Yes ❑ Nay' Directional svy req'd: Yes � No F1 r Inr' y h U/ GJ V /G] Y2, V l ✓t J 'd: Yes ❑ Notyl Inclination -only svy req'd: Yes ❑ !J l Ver/ r wGtnI/pati L ezCep ion r Post 006 initial injection MIT apkl: Yes �o❑ /--o rtl O/I of pTD d Ile f-yYC PoP r 1. GG f-57 l ✓Yb�r Cta C G n �1Y1 of 10 `e)C. In Jr!Gi i ort O !LI If r4! l J APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Submit Form end U1iJ L I IV H C ( (9)) Allechnren[s in Duplicate Revised Applicatiu .or Permit to Drill, Well CRU CD5-316 Saved5-Jul-17 CRU CD5-316 Application for Permit to Drill or�n� t-, MMUS ConomPhillips `i' Table of Contents 1. Location Summary................................................................................................... 2 2. Proposed Drilling Program..................................................................................... 9 3. Diverter and BOP Information.............................................................................. 11 4. MASP Calculations................................................................................................ 14 5. Geological Information..........................................................................................16 6. Casing and Cementing Program.......................................................................... 16 7. Drilling Fluid Program........................................................................................... 27 8. Discussion of Mud and Cuttings Disposal and Annular Disposal ..................... 29 (Requirements of20AAC 25.005(e)(14))........................................................................... 29 9. Drilling Hazards Summary....................................................................................30 10. Proposed Completion Schematic......................................................................... 33 CRU CD5-316 APD Page 1 of 31 Printed 5 -Jul -17 Revised Applicat�i� ,or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 1. Location Summary This well is planned for Location at Surface 380' FNL, 2728' FEL, Sec. 18, TI IN, R4E, UM NAD83 RKB Elevation 70.8' AMSL Northings: 5,965,580.48 Total Vertical Depth, SS: 7,368' Eastings: 1,489,283.58 Pad Elevation 34.0'AMSL Location at Top of Productive Interval Heel 1849' FNL, 3139' FEL, Sec. 26, Tl 1N, R3E, UM NAD83 Northings: 5,953,774.00 Eastings: 1,478,421.00 Measured De th, RKB: 18,789' Total Vertical De th, RKB: 7,439' Total Vertical Depth, SS: 7,368' Location at Total Depth Toe 248' FNL, 1977' FEL, Sec. 2, TION, R3E, UM NAD83 Northings: 5,944,784.00 Eastings: 1,479,401.00 Measured Depth, RKB: 27,824' Total Vertical Depth, RKB: 7,521' Total Vertical Depth, SS. 7,450' Please see attached directional profiles. CRU CD5-316 APD Page 2 of 31 Printed. 5 -Jul -17 Survey Plat Revised Applicata.... ,or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 CRU CD5-316 APD Page 3 of 31 Printed., 5 -Jul -17 i Revised Applicatl,,.. ror Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 FEv DM1c E_i CtiAFP D_3.RIPTr0x R -v "Al- _.pr.__,-.. LK Grl APP_ MSGJPTIO! 4Iz4Jt`,' I CZ OB C.A. lP[?AITp FER !(1 r'T ' - 'C' v%2%16 '::1 C.A. UPDATEC PLR KIMY-13ACS ALPINE SATE>LLIIL L)LbLL0FMU,,T U_ U_4 LOCATION OF THIS SURVEY _ ti, CD4 TO ALPINE COS _ Yr'•"'� ACCESS 11N ' _j _ {it I -el �r it I 1 ,J711 55 q I1 i � t p i� IT_ VIUTTY VAP 4'GT TO SCALE _Et;ENIi: I PRCPDED CONDUCTOR EXISING 1701,01.1c'CR R. 4 E.. L'.M. LEL?tEN ,fi -'. It L, R L, U.4 - - -- - - r1v f 9 pe -yrr CD -5 `�cR ` .�I PAD ;r+c'J ,A g4seS�q, `°' V' - {I :•t. �Utfff 6"f-f3.e •r I 4t P��d� LANI 1 N it .,n ' SJ NOTE: I3'/tl�s2' �'tvl` 41 CONDUCTOR C05 -x14 WAS PLUGGED ANf; ABANDONED APRIL 2015. YfYf' ,,- KUUKPIK + VMTAQ I M IAIE SURVEY G -FIC£ 't sN.]YS: i69.6R.T.li �.� ALPIN_ - MCOULE:CM UNI-: CD ConocdWilips PROJECT 5 'WEE CD -5 'HELL CONDUCTORS _. Alaska, Inc. AS—BUILT LOCATIONS -ACP FII.( 4� _IAVANG Nr. PART- REV: %3015 : D r -1 i.7 %5 �.�m� € 3 i CRU CD5-316 APD Page 4 of 31 Printed: 5 -Jul -17 Revised Applicata ...or Permit to Drill, Well CRU C135-316 Saved: 5 -Jul -17 6EY DATE By TE [x AW .4rRe"rxa� _048 5f2/i Cr 2Y CX 4�P DESCR:mC'ix' 3 3fD TO GD C.A. I.IPDATED 1'EP. K170003ACS CZ G0 j C.A. UFDATEO AER ?(16000}ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E. U. M. UrP.IL 'Y� t LAT (N) LONG.(w) SEC_IN =N.l.. 0/s FWL f N D Lx,:. P CD5-x99 5,965.666 9" 12.`~541.57 Obi x01 5.965 66 f { 9 i4 £CA5 x02 59656562 ---'48955329 �L1:x x03 L4 9 5 t 4D COexp{ 5 9fi� 645 24-`il 459 514 '7 CL9' -x05 5 965 639 8G 1 1,489,495.46 O35 -x06 b.965.634.56 1,489.476.20 CY} -x07 5 96.5 629.06 1 489 4E.T 09 70'19 49711 "f5"i„;'' Lt` 17er 70' 15 49.155' I' 1 tf j7 �C 78 49.094 f t°7 ti 21�A34 204 70 '8 44 042 tS 1; sji�i $I�v 7G 18 48.98 15a 11� 0,Q 3 ;11' 0 18 49.9 5 151 • 23 611' 70 18 48870 751 ; zd 1ZG ;2'' 70' 18 4S.fi12 7. 1 7 ^ 4124n �i2E1'. 25C8 211.5 S.'3 4 5 -3i 9 41i i67 �7 +4'1 - [ 32 2Ta �i �+ 4 't'8 1 4 . ,,� -27.7 _34.3 11 r4 +`� I-II -x06 1.961.623.08 1 489 4.'-7.69 70- 18 48.757- $.757 _. 1.189.41854 1 489 415 5 7D' 1$ 48.644 51' 135 7D' i$i$ 48 ,6.95 151' 13'JWB7 id: as 28,19' ..6 5 -xi 9659 1,469334.86 489 41 3 4-4{.a3ig z3 I 70' 18 48.586 1U' 16 46.476 7G' 1H- 48:4F4- 151' iT-4 151 139 _ 45 - >ty i6a' 22'!7 +("05 ^rs9 >-_ 27,9h 2r,1 i}X 94 x15 1 i 489 [� 3`_ ?U' 18 48A 1 4 8 - 3.71 ?D 15 4$ 359 151 137 151 1 X7; _C 2221 26 5 3d 2_- 'x16 D 4 13,-� 91 4'2 1 4 9 3-S& 264.31 4F4T1. 1489 7 D IH 48 30C FU 15 48.4`43 7G 78 iH.IS? T ' 18 48131 1757 151 137 151 13 6�_(`jj,a 51 -39 130 3RC '. 391 ;a; 77112 2154 �tAd78$5697 7. t 7 4 Q1'.89 5653 ' 4014 _^ML1.712' IJ j 4'555L _ i 4H§215fi: U 1 481$ .L 4 I ,�j 74971--7i'tf-f7. IUI8� 48.033" 1St 137 403 2 I 33.8 ..iJS .P '8 4 . 16 T51' 3 32.552 409 %i CF77.P 3. fu 1 4.9 11 13 33.105 415 2057 277 .,37 02 151-t3 3.656 420 i xi a 264 33.7 + - 1.A 7j' 7j 4 O 15 A/.846 191- 13 34.222 1�L t.hl I S 34.783 426 -2049 432 2629 28.0 27 7 33.7 33.7 M16 it 2'EC -' C --x 7 9655[1 89 aik,PrB_ f: 5- 5. 551 a i 4 Qy,2,1$ C05 -x A 9 96 f0 it• -y� Qi3,34 COS -x30 59655C49� i j AIp 4,02 COS -x31 5 955 44a 57 t d 44.7 iIi.340 438__ 2070 26 - 33.7 _ 70Q 1LI`�7 75"- tV 13' 35.891- 444' 11991' 2J5. 33.7 r t�_4t,t$. �.1Tj1 SS- 6 x0" 4-49 972 77.4 33,6 _ t8 4a"�%i i 1 1 4 5 9 3' 27.6 33.6 l` +li i4''9ia1�1��. 461 '9 4 25.3 33.6 1ijTiZd¢"Z"-Tars '-j3 _ 8.t 45'r 19 �Sr 26.6 7Q J_6 ..47,3$0° _ 15I 1� 94 4? 3 69-' 268 7r5_i 47 I ,24 v8 1 876 27.D 33.6 33.6 17.6 C05 -x32 5 965 494.1 ° 7 7 .d- WS -x33 5965488.75 id9 956.. NOTES I. COORDINATES 5HOW4 HEREON ARE ALASKA STATE PLk-,E, ZONE 4, NAD 83. 2. ELEVATIONS SNOUN ARE BRI`W, PETCUUM MEAN !1& I.€.`l;.�l. KU7�7U�KPIK U M I A Q CONDUCTOR 3. CONDUCTOR m5 -x74 11'45 PLU,OED arl �' ABANDONED APRIL, �C <� • F. ALPINE SURVEY OFFICE rncxe: arraw.m ALPItlE MODULE:CO50 UNIT; CD ConocoPhillinS A,_PINE PROJECT M CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CALL A `L2DRAµ1HG 15 "_ 6226-1 04/,B2015 NO; CE-CD50-1025 PART: 2 o:3 P.Dk a CRU CD5-316 APD Page 5 of 31 Printed: 5,1u1-17 f Revised Applicati�.. ,or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 " 2.r Cx nrr oc�cwr CZ DB C.A. t CATER PER K15ODD3ACS 2 5/2/16 CZ GD C.A, LwDAIEtl FEk R NOTES 1. ALL COOR_IINA,ES SHOWN ARE: ALASKA STATE PLANE, ZONE 4, NAD 83 2. ELEVATIONS SHO'hN ARF FRITIS-I PFTRCI1.EQm MEAN SEA LEVEL. ORIGINAL f;ROUND ELEVATIONS MERE DE -RIVED FRMt THE AVERAGE ELEVATION ALONG THE TOE OF THE UD -4 GRAVEL PAD. 3. BASIS OF COORD'.N.ATF`-,: AIPINt= PERMANENT CONTROL 440NUMENTS PER SURVEY BY VCUUKFIKACRiF, JUNE 2013. 4. DATES OF AS-BU=LT SURVEYS: WELL CONDIJ00PS CD5-X.12, CD5 X53, CD5-X14, CD5-5:15, 4/I0,/I5, [H 20IS-12 PG5 4-7, 9; CD5-XC1 THRU CD5-X11, 4/'17/15, FB 2015-10 PSG& 47-52; CD5-X21, 2/29/tE, FB 2016-C,3, P . rag; CD.5-X",6, C.D5-XT7, C05 -X22, FB 2016-t33, PG 69; CD5-Xa8, CD5-X19 & CDS-X20, - l /t E, F3 2016 03, PG. 75; CD5-X23, 05-Y24, 3/11/16, FE5201R-05, PG. 30; CD5-X22.5. CD5-X26, 3/1,/16, FB2016-05. PGS :4-35; C05-27 THRU 01)5-30, FB 2016-05, PGS 38-34, 3/13/16; Mfi-X30 THRU CD5-X?-3, 0.1/15/16, FB 2016-015, PG. 53; CD -5-X99 & ::D5 -14X, 5/01/1b1 F8. 2016-09, PGS 1 & 3. 5. CONDUCTOR C05 -x14 WAS PLUGGED AND ABANDONED APRIL 201b. •''��, Oa Aa'a64p IPRACTICF SUF'vEYN PROPERLY REGISTERED S JF AiItAO IS THAT,TH �o�t1`;.%•"°^•",.• S {�1TO A 0 � AS -BUILT REPRESENTS A SUAVE- MAUL- BY ME OR UNDER MY LIRECT +'• #11 SUPERVISION, THAT THE MCNUMrN'3 SWYO)N H"FON ACTUALLY EXIST >r * , AS DESCRIBED, AND THAI ALL DIM_NSIDNS MID OrKrYt OfTAIS ARE r bxh z f_ CORRECT. +P : C. paid c. &rice f 2i �i�°fa F ,,... ..,••�»c 'ate•► MIA tz:►:*•' � ConocoPhillips Alaska, Inc. RIE NO I DRAWNG NO, DATE45f/6_^(7Rr&STRATION NO. LS -5011' KU UKPIK UMIAQ ALI WE 3Ui,.vEf OFFICE mmt 1=41alrm A'tPINE MDDLILE:CWOl I;NIT: ALPINE PROJECT CD -5 WELL CONDUCTORS AS -BUILT LOCATIONS _- ---- .___ �-T F*A9T: I BEV: CRU CD5-316 APD Page 6 of 31 Printed: 5 -Jul -17 AT+ -n o'er rMR v - aw��aa.m u.• o�.,aa•...a..0..a.l,.nMM .a,..,, ----------------------------- P i,.---- - !o�ono�000So����r�r�c�nnn����0000Souu���� ----------- Nal.•. A ^ ..� q�nn� Y.�t* MM t 7 D[axo o'er - aw��aa.m u.• o�.,aa•...a..0..a.l,.nMM .a,..,, .—I YwD1PM MASTER STE PSI SIZE PLAN f . C, .. - _.... __-- ,Da DDI -._. ......- ___ r_v .•.... .._... .• o. - ICY- CE-CD5L 10]t Well Plat -- - Pipeline Proposed Plughack — Proposed Trajectory a Open Interval Pads and Roads CRU Boundary Leases (Lessor, Lease No.) Q ASR, AA092347 Q ASRC, ASRC-AA092344 Q ASRC, ASRC-NPR2 Q ASRC, ASRC-NPR3 Q ASRC, ASRC-NPR4 Q BLM, AA081797 Q BLM, AA081817 Q BLM, AA087888 Q BLM, AA087896 Q BLM, AA092675 Q BLM, AA093746 Q BLM, AA094165 Q BLM, AA094167 1 1 1 1 1 1 1 AA093746 1 347145000 BLM 1 3840 ac. 1 1 1 1 ; 1 1 1 Revised Applicati�...or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 AA092347 340758000 ASRC 1280 ac. _. _. _._._. _._.'•1 1 ASRC NPR3 932671000 ASRC 4433 ac. ASRC-NPR2 932128000 ASRC 12615 ac. CD5 932552000 1 i Colville BLM `P 1 � G 1 AA027888 AA09234] N Z 1 307461000 340758000 JT ASRC ASRC-NPR4 1 1 80 ac. 1BLM 280 ac. 932669000 ASRC ASRC 3122 ac. 15912 ac. ----------------1 2666 x. AA081817 932552000 BLM ...= 2525 ac. AA081817 932552000 Greater i Colville BLM Q0 2525 ac. 6 i River Unit 65 ; 366606 0 3666060000�1O BLM 34075 00092346 5120 ac. ASRC BLM 3122 ac. AA081817 932552000 BLM ...= 2525 ac. 1NR3C T ' _ 4R3E IT10NR4E AA092675 341734000 BLM 5616 ac. ConocoPhillips Alaska, Inc. CD5-316 Proposed Well WP05 with Lease Boundaries 3/17/2017 CRU CD5-316 APD Page 8 of 31 Printed: 5 -Jul -17 1 Ilur Greater i Colville Mooses i River Unit Tooth Unit ; AA094167 966658000 1 BLM 1 2666 x. 1 AA087896 1 – , – , 307469000 _ ._._._._. BLM ; 6065 ac. AA081797 1\T 932532000 1 BLM 3200 ac. 1 1 0 0.2 0.4 0.6 0.6 1 r1.2 1.4 Miles 1NR3C T ' _ 4R3E IT10NR4E AA092675 341734000 BLM 5616 ac. ConocoPhillips Alaska, Inc. CD5-316 Proposed Well WP05 with Lease Boundaries 3/17/2017 CRU CD5-316 APD Page 8 of 31 Printed: 5 -Jul -17 Revised Applicatiu...or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 2. Proposed Drilling Program 1. MIRU Doyon 19 onto CRU CD5-316. 2. Rig up and test riser, dewater cellar as needed. 3. Rig up diverter and test. 4. Drill 16" hole to the surface casing point as per the directional plan. ((LWD Program: GR). 5. Run and cement 13-3/8" 68 ppf L-80 surface casing to surface with 1 centralizer perjoint from TD to 2 jt's below the conductor. 6. Shut diverter around landing joint and allow for cement to set. 7. Install BOPE with the following equipment/configuration: a. 13-5/8" annular preventer b. 3.5"x6" VBR's on top and bottom c. Blind rams in middle 8. Test BOPE to 250 psi low/ 3,500 psi high. 9. Pick up and run in hole with 12-1/4" drilling BHA to drill intermediate #1. 10. Pressure test casing to 3,000 psi for 30 minutes. Chart test 11. Drill out shoe track and 20' of new hole. Perform LOT to maximum EMW of 18.0 ppg. Minimum LOT required to drill ahead is 12.0 ppg EMW. 12. Displace well from 10.0 ppg DrilPlex to 9.6 ppg LSND mud. 13. Drill 12-1/4" hole to the casing point in the Albian at -13,95011 MD. (LWD Program: GR/RES/NEU/DEN/NMR). 14. Circulate wellbore clean and POOH. Weight up mud to l O.Oppg prior to trip. 15. Change upper VBRs to 9-5/8" solid body rams. Test same to 250 psi low / 3,500 psi high. 16. Run 9-5/8" 40.0 ppf L-80 liner with hanger and liner top packer. Run centralizers at 1 per joint frequency from liner shoe to planned top of cement. 17. Pump single stage cement job to isolate the Albian Sub97 or uppermost hydro -carbon bearing zone. Set liner top packer. 18. Change upper 9-5/8" solid body rams to 3-1/2" x 6" VBRs. Test BOPE to 250/3500 psi. 19. Pick up and run in hole with 8-3/4" drilling BHA to drill intermediate pilot hole. 20. Pressure test to 3,000 psi for 30 minutes. Chart test. 21. Drill out shoe track and 20' of new hole. Perform LOT 12.5ppg EMW, Minimum required to drill ahead is 12.5 ppg EMW. 22. Drill 8-3/4" hole to section TD of -19,80011 MD to extend logging package across Kuparuk C sand. (LWD Program: GR/RES/NEU/DEN). 23. Circulate wellbore clean and POOH. Weight up mud to 11.Oppg prior to trip. 24. Pick up and RIH with 30 joints of 3.5" cement stinger on 5" drill pipe. 25. P&A 8-3/4" pilot open hole by pumping 15.8 ppg Class G cement plugs from TD to 100ft MD above Kuparuk C sand top or other uppermost hydrocarbon bearing zones. 26. P&A 8-1/2" pilot open hole by pumping 15.8 ppg Class G cement plugs from 16,500ft MD to 17,OOOft MD to abandon non -hydrocarbon interval. CRU CD5-316 APD Page 9 of 31 Printed: 5 -Jul -17 Revised Applicata.....or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 27. Pump 17.0 ppg cement kick-off plug on top of a high-visocity bentonite pill to bring cement 200ft inside of casing. 28. POOH with cement stinger and wait on cement to build >500psi compressive strength. 29. Test BOPE to 250 psi low / 3,500 psi high. a. 3.5"x6" VBR's on top and bottom b. Blind rams in middle 30. Pick up and run in hole with the 8-3/4" x 9-7/8" rotary steerable system and run in hole. 31. Kick off of 17.0 ppg cement plug at 13,950ft 32. Drill hole to intermediate #2 casing point into the Kuparuk C sand at 18,789' MD using Managed Pressure Drilling technology to maintain constant bottom hole pressure on connections. (LVD Program: GR/RES). 33. Circulate wellbore clean and POOH. Weight up mud to 1 l.Oppg prior to trip. 34. Change upper VBRs to 7" solid body rams. Test same to 250 psi low / 3,500 psi high. 35. Run in hole with 7" 26.0 ppf L-801iner on 5" drill pipe to section TD. Run centralizers at 1 perjoint frequency from liner shoe to planned top of cement. 36. Circulate and condition mud in preparations for cementing. 37. Cement 7" liner to 500' above hydrocarbon bearing zones. Set liner top packer. 38. Run 7" 26.0 ppf L-80 tie -back to surface. 39. Displace 9-5/8" x 7" annulus to corrosion inhibited brine and diesel freeze protect. Test tie -back seals. 40. Change upper rams to 3-1/2" x 6" VBR's. Test BOPE to 250 psi low / 3,500 psi high. 41. Pick up and RIH with 6-1/8" drilling assembly. Verify top of cement with sonic too] in recorded mode. (LWD Program: GR/Azimuthal RES/ Sonic for TOC evaluation). 42. Chart casing pressure test to 4200 psi for 30 minutes. 43. Drill out 20' of new formation and perform FIT to 12.5. Minimum acceptable leak -off for drilling ahead is 11.5 ppg EMW. 44. Displace well to 9.0 ppg FloPro water based drilling mid. 45. Drill 6-1/8" horizontal section to TD. 46. Circulate wellbore clean. Pull out of hole with drilling BHA. 47. RIH with 4.5" liner with pre -perforated pup joints on 4"drill pipe. 48. Set liner top packer and release from liner. 49. Displace well to kill weight brine. 50. Run 4.5" upper completion. 51. Space out and land hanger. 52. Install 2 -way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 53. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 -way check. 54. Test tubing and tubing -casing annulus separately to 3500 psi / 30 mins. 55. Shear circulation valve in GLM. 56. Circulate tubing to diesel and install freeze protection in the annulus. 57. Set BPV and secure well. RDMO. CRU CD5-316 APD Page 10 of 31 Printed: 5 -Jul -17 3. Diverter and BOP Information Diverter Schematic 21W 2,000 psi WP DRILLING SPOOL wl 16° Outlet Diverter Line Layout r Revised Applicatl�...or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 2,000 psi WP (ENTER VP ILIC KNIFE VALVE DIVERTER LINE 20' 84 ppl CONDUCTOR PIPE CRU CD5-316 APD Page 11 of 31 Printed. 5-JUI-17 II. �� tlDODOODD DD40 tltltltl�0�Otl0 tltltltl tlOtl UDtltl I •ew Twwwiwww we,w®mac�awwwwwwww----- ■ ■ u i. Y ■3 • • i a .�.��—�.-.r.... ,...�,...�'� r:•����iilll�7�c�.l7ia�GEl CRU CD5-316 APD Page 11 of 31 Printed. 5-JUI-17 BOP Schematic Revised Applicati,.. ,or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 N_ 0. RKB Center x.aurre- Annular Preventer Bottom Annular Prewmer Center Upper Rams Center mOR1L Blind Rams Center Lower Rams ULDS LLDS 'All ram measurements are to the middle of the ram body and from RKB BOP Equipment • I ea. - Hydril annular BOP, model MSP, 21 1/4" x 2000 psi, flanged, NACE trim • I ea. - Hydril annular BOP, model GK, 13 5/8" x 5000 psi, flanged, NACE trim • 2 ea. - Hydril single gate, model MPL, 13 5/8" x 5000 psi, flange x flange, NACE trim with ten inch operators • 1 ea. - Hydril single gate, model MPL, 13 5/8" x 5000 psi, flange x flange, NACE trim with fourteen inch operators • Stack is moved by 2 ea., 20 ton hydraulic BOP cranes controlled by a remote console • Rams are handled with a hydraulic winch in the cellar BOP Closing Unit • I ea. — Hydril, 8 station, 3000 psi, 165 gallon accumulator unit • Primary closing hydraulic power is provided by an electrically driven triplex pump with adequate high pressure hydraulic bottle storage. • Secondary system back-up is a 30:1 air pump, and emergency tertiary back-up closing pressure is provided by a four -bottle, high pressure nitrogen rack. The PLC controlled remote closing BOP operator panels are located in the doghouse, accumulator unit and the utilities module. CRU CD5-316 APD Page 12 of 31 Printed: 5 -Jul -17 Rig Choke Manifold r Revised ApplicatiL...or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 1V0V%m1 Mt/LLB7611MC. MATERIAL LIST em ur on n •tna•1w1RwwN ppsmw .n. cnove e a.waraagv.ra. encu 1,2,5 avla•aNranuNaNevmu 3,4.&18 YITaMRautleMe Ve RIG - 19 LEDGEND wnne Handle Vaivea Nam�ally Open ' ®Red Hanele VUv<s Normally CbaeE Date: 1422-01 Rev.1 1 DIWRr uD. Co -Flex Hose Variance • CPAI intends to utilize Co -flex (flexible high pressure) hoses in place of solid straight lines on both the choke and kill -line sides of the BOP stack. CPAI requests a variance to the requirements of Onshore Order No. 2.III.A.2.b. CRU CD5-316 APD Page 13 of 31 Printed: 5JU1-17 Revised ApplicatL..or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 4. MASP Calculations The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size (in) Csg Setting Depth MD/TVD (ft) Fracture Gradient ( )(psi) Pore pressure ASP Drilling (psi) 20 1151115 10.9 52 54 13.375 2445/2185 14.5 977 1429 9.625 13950/6041 16.5 2701 2598 7 18789/7439 12.5 3350 2606 4.5 27824/7521 12.5 3350 N/A PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP= [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from Ib/gal to psi/ft 0.1 =Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below conductor casing (20") ASP = [(FG x 0.052) - 0.1] D =[(10.9x0.052) -0.1]x 115=54 psi OR ASP= FPP-(0.1 x D) = 977 - (0.1 x 2185) = 759 psi 2. Drilling below surface casing (13-3/8") ASP = [(FG x 0.052) - 0.11 D _ [(14.5 x 0.052) - 0.1] x 2185 = 1429 psi OR ASP= FPP-(0.1 xD) = 2701 - (0.1 x 6041) = 2097 psi 3. Drilling below intermediate liner (9-5/8") ASP = [(FG x 0.052) - 0.1 ] D _ [(16.5 x 0.052) - 0.1 ] x 6041 = 4579 psi OR ASP= FPP - (0.1 x D) CRU CD5-316 APD Page 14 of 31 Printed: 5 -Jul -17 Revised Applicatiu...or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 = 4070—(0.1 x 7521) = 3326 psi 4. Drilling below intermediate casing (7) No ASP = [(FG x 0.052) — 0.1] D = [(12.5 x 0.052) — 0.11 x 7439 = 4091 psi ASP = FPP — (0.1 x D) = 4070 — (0.1 x 7439) = 3318 psi (B) data on potential gas zones, The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensity for differential sticking, CRU CD5-316 APD Page 15 of 31 Printed: 5 -Jul -17 Revised ApplicatiG.. ,or Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 5. Geological Information Estimated formation pressures, total vertical separation, anticipated formation Fluids and associated lithologies as per Onshore Order No. 1.III.D.3. CD5-316PB1wp07 - Pilot Hole Program Csg/Tbg Hole 3¢e Weight Formation Formation Formation Top MD?VD Btm MDIND MD (ft.) TVD (ft.) Formation Thickness Pressure Pressure Lithology Formation (re) ft. TVD(psi) (psi)EMW EMW Fluid 1,341 1,321 Base Permafrost 11321 591 8.6 Mudstone Water 2,659 2,294 C-30 312 1,026 8.6 Sandstone Salt Water 8,844 4,354 Albian Sub 97 15 1,947 8.6 Sandstone Water 19,625 7,450 Kuparuk C 9 4,070 8.8-9.0 Sandstone Oil CDS-316wp03.1 - Sidetrack Program Csg/Tbg Hole 3¢e Weight Formation Formation Formation Top MD?VD Btm MDIND MD (ft.) TVD (ft.) Formation Thickness Pressure Pressure Lithology Formation (re) ft. TVD (psi)EMW Fluid 1,341 1,321 Base 1,321 591 8.6 Mudstone Water 79 Surf Permafrost Previously installed 2,659 2,294 C-30 312 1,026 8.6 Sandstone Salt Water 8,844 4,354 Albian Sub 97 15 1,947 8.6 Sandstone Water 18,789 7,439 Kuparuk C 9 4,070 8.8-9.0 Sandstone Oil 6. Casing and Cementing Program Casing and Cementing Program Csg/Tbg Hole 3¢e Weight Grade Conn. Length Top MD?VD Btm MDIND Cement Program OD (in) (Ib7ft) (h) (p) (re) 20 42 94 H-40 W lde 79 Surf 114/114 Previously installed Hydril Cement to Surface with 13-3/8 16 68 L-80 563/ 2,409 Surf 2,445/ 2,185 1175 sx DeepCrete Lead at 11.0 ppg, BTC -M 328 sx Class G Tail Slurry at 15.8 ppg 974 sx Class G Lead at 12.2 ppg w/ TOC at 9-5/8 12-1/4 40 L-80 BTC -M 11,950 2,000 / 1,891 13,950 / 6,041 8,344' MD (Albian Sub 97 Isolation) 217 sx Class G Tail at 15.8 ppg n/a Plug 1: 324 sx Class G at 15.8 ppg (Pilot) 8-3/4 n/a n/a n/a 5,950 13,750 / 5,976 19,900 / 7,510 Plug 2: 270 sx Class G at 15.8 ppg Plug 3: 336 sx Class G at 17.0 DDo 7 8-3/4 x 26 L-80 BTC -M 18,753 Surf 18,789 / 7,439 173 sx Class G 15.8 ppg cemented to liner 9-7/$ 1 1 1 top at 18,248' MD 4-1/2 n/a 12.6 L-80 Hydril 18,564 Surf 18,600 / 7,422 n/a- 563 production tubing n/a- 4 1/2 6-1/8 12.6 L-80 TXP 9,200 18,600 / 7,422 27,800 / 7,521 Uncemeneted open hole liner w/ pre - perforated pup joints CRU CD5-316 APD Page 16 of 31 Printed: 5 -Jul -17 I Revised Applicati. jr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 Casing Scheme OD in Name Type Hole Size in Measured Depth (ft Collapse psi Mud at Shoe Connection I Body 20 78.6 Hanger Shoe TOC Conductor 20 Conductor Casing 42 36 115 36 10.0 13-3/8 Surface Casing 16 36 2,44-5 36 10.0 9-5/8 Intermediate 1 Liner 12-1/4 2000 13,950 8,344 11.0 7 Intermediate 2 Liner 8-3/4 x 9-7/8 1-3,8-00 18,78-9 18,248- 10.5 7 Intermediate 2- Tieback Tieback n/a 36 13,800 n/a 10.5 4-1/2 Production Liner 6-1/8 18,600 27,800 n/a 10.5 Casing dimensional data & properties: All casing and tubulars used in the well will be NEW. The manufacturer's detailed specifications are as follows: Size in.) Weight (pf) Grade Connection Internal Yield (psi) Collapse psi Tensile Strength Connection I Body 20 78.6 L-80 Welded Conductor 13-3/8 68.0 L-80 HYD563 5020 2260 1556 M 1556 M 13-3/8 68.0 L-80 BTC -M 5020 2260 1545 M 1556 M 9-5/8 40.0 L-80 BTC -M 5750 3090 947 M 916 M 7 26.0 L-80 BTC -M 7240 5410 641 M 604 M 4-1/2 12.6 L-80 HYD563 8430 7500 288 M 288 M 4-1/2* 12.6 L-80 TXP 8430 7500 288 M 288 M *Pre -perforated Liner. Nominal values of solid joints listed. CRU CD5-316 APD Page 17 of 31 Printed: 5 -Jul -17 Revised Applicata. jr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 Design Factors The design factors used for the pipe body on the casing strings are: Burst 1.15 Collapse 1.05 Axial Tension 1.40 Compression 1.40 Triaxial 1.31 The design factors used for the connections on the casing strings are: Burst 1.15 Axial Tension 1.67 Compression 1.67 13 3/8" Surface Casin¢ 13-3/8- BURST LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Temperature Profile Internal Pressure Profile Temperature Profile Well displaced to gas. Pore Pressure Gas Kick Profile Pore pressure Pressure from pore Geothermal Gradient Displacement fluid (10.0 Geothermal gradient pressure kick at 13,950' Displacement to Gas Pore Pressure 50bbl kick, pore pressure at Geothermal Gradient 13,950' Fracture @ Shoe with Gas Fracture Gradient Gas gradient Geothermal Gradient Gradient Above Green Cement Pressure Pore Pressure + cement 500psi test pressure + 10.0 Test fluid column ppg fluid gradient Geothermal Gradient Drill Ahead Burst Pore Pressure 1 10.0 ppg fluid gradient I Geothermal Gradient Pressure test Pore pressure 3500 psi surface pressure + Geothermal gradient 10.0 ppg fluid column 13-3/8- AXIAL LOAD CASES 13-3/8- COLLAPSE LOAD CASES Load Criteria Load Case ExternalPressure Profile Internal Pressure Profile Temperature Profile Full Partial Evacuation Pore Pressure Evacuated to shoe Geothermal qraclient Cementing 11.0 ppg slurry to surface + 500ft of 15.8 ppg slurry tail Displacement fluid (10.0 Geothermal gradient 13-3/8- AXIAL LOAD CASES Load Case Load Criteria Running in hole 3.0 ft/s Overpull force 100 000 lbs Green Cement Pressure Test 500psi CRU CD5-316 APD Page 18 of 31 Printed: 5 -Jul -17 Revised Applicati, x Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 9-5/8" Intermediate #1 Liner 9-518" BURST LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Temperature Profile 100,000 lbs Gas Gradient to 10,675' Well displaced to gas. (1/3 TVD Evacuation to Gas Kick Profile Pore pressure Pressure from pore Geothermal Gradient Geothermal gradient TD pressure kick at 18,789' Displacement to Gas Displacement to Gas Pore Pressure 50 bbl kick, pore pressure Geothermal Gradient 8,834' + 12.2ppg cement f/ Displacement fluid at 18,789' Fracture @ Shoe with Gas Fracture @ Shoe with Gas (10.0ppg) Geothermal Gradient Gradient Above Gradient Above Fracture Gradient Gas gradient Geothermal Gradient Green Cement Pressure Pore Pressure + cement 500psi test pressure + 10.0 Test Test fluid column ppq fluid gradient Geothermal Gradient Drill Ahead Burst Pore Pressure 11.0 ppg fluid gradient Geothermal Gradient Pressure test Pore pressure 3500 psi surface pressure + Geothermal gradient 11.0 ppg fluid column 10.0 ppg fluid column 9-5/8"COLLA PSE LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Temperature Profile *Partial Evacuation 100,000 lbs Gas Gradient to 10,675' 500 psi (1/3 TVD Evacuation to Pore Pressure + 10.0 ppg fluid gradient to Geothermal gradient next casing point) Geothermal gradient TD Displacement to Gas 10.0 ppg mud to surface to 30 bbl kick, pore pressure Geothermal Gradient Cementing 8,834' + 12.2ppg cement f/ Displacement fluid Geothermal gradient Fracture @ Shoe with Gas 8,834't/13,450' + 500ft of (10.0ppg) Geothermal Gradient Gradient Above 15.8 ppg cement to shoe *Note: ConocoPhillips corporate casing design requirement for 1/3 evacuation of intermediate drilling liners is more stringent than BLM-accepted partial evacuation to 0.22psi/ft gradient and therefore has been used for this casing design. 9-5 8" AXIAL LOAD CASES Load Case Load Criteria Running in hole 3.0 s Overipull force 100,000 lbs Green Cement Pressure Test 500 psi 7" Intermediate #2 Liner 7" Liner BURST LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Temperature Profile Internal Pressure Profile Tem erature Profile Well displaced to gas. Pore Pressure Gas Kick Profile Pore pressure Pressure from pore Geothermal Gradient Displacement fluid 11.0 Geothermal gradient pressure kick at 27,824' Displacement to Gas Pore Pressure 30 bbl kick, pore pressure Geothermal Gradient at 27,824' Fracture @ Shoe with Gas Fracture Gradient Gas gradient Geothermal Gradient Gradient Above Green Cement Pressure Pore Pressure + cement 500psi test pressure + 11.0 Test fluid column ppg fluid gradient Geothermal Gradient Drill Ahead Burst Pore Pressure 10.5 ppg fluid gradient Geothermal Gradient Pressure test Pore pressure 3500 psi surface pressure + Geothermal gradient 11.0 ppg fluid column CRU CD5-316 APD Page 19 of 31 Printed. 5 -Jul -17 7" Liner COLLAPSE LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Tem erature Profile Full Partial Evacuation Pore Pressure Mud level at 12600' Geothermal radient Cementing 11.0 ppg mud to surface + 6000ft of 15.8 ppg cement Displacement fluid 11.0 Geothermal gradient CRU CD5-316 APD Page 19 of 31 Printed. 5 -Jul -17 Revised Applicata, jr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 7" Liner AXIAL LOAD CASES Load Case Load Criteria Running in hole 3.0 ft/s Overpull force 100,000 lbs Green Cement Pressure Test 500 psi 7" Intermediate Tieback 7" Tieback BURST LOAD CASES Load Case External Pressure Profile Internal Pressure Profile Temperature Profile Temperature Profile Full / Partial Evacuation Well displaced to gas. Mud level at 18,789' Gas Kick Profile Pore pressure Pressure from pore Geothermal Gradient Geothermal gradient 18.936 pressure kick at 27,824' Displacement to Gas Pore Pressure 30 bbl kick, pore pressure Geothermal Gradient at 27,824' 58.97 Fracture @ Shoe with Gas Fracture Gradient Gas gradient Geothermal Gradient Gradient Above Hydril 563, 36.00-2445.00 12.259 Green Cement Pressure Pore Pressure + cement 500psi test pressure + 11.0 Test fluid column ppg fluid gradient Geothermal Gradient Drill Ahead Burst Pore Pressure 10.5 ppg fluid gradient Geothermal Gradient Pressure test Pore pressure 4200 psi surface pressure + Geothermal gradient 36.00-2445.00 12.259 11.0 ppg fluid column 7" Tieback AXIAL LOAD CASES 7" Tieback COLLAPSE LOAD CASES Load Criteria Load Case External Pressurofile Pre Internal Pressure Profile Temperature Profile Full / Partial Evacuation Pore Pressure Mud level at 18,789' Geothermal gradient Cementing 11.0 ppg mud to surface + 600f: of 15.8 ppg cement Displacement fluid 11.0 Geothermal gradient 7" Tieback AXIAL LOAD CASES _ Load Case Load Criteria Running in hole 3.0 ft/s Overpull force 50,000 lbs Green Cement Pressure Test n/a Casing Load Results String OD/Weight/Grade Connection MD Interval (ft) Drift (in.) Minimum Safety Factor (Abs) Burst Collapse Axial Triaxial Conductor Casing 20", 94.000 ppf, K- BTC, L-80 36.00-115.00 18.936 55 58.97 6.19 3.15 3.25 Surface Casing 13 3/8", 68.000 ppf, Hydril 563, 36.00-2445.00 12.259 L-80 L-80 1.28 2.52 3.71 1.58 Surface Casing 13 3/8", 68.000 ppf, BTC, L-80 36.00-2445.00 12.259 L-80 1.35 2 3.82 1.56 Intermediate Liner 9 5/8", 40.00 ppf, L- BTC, L-80 2000.00- 8,750* #1 80 13950.00 1.64 1.19 2.41 1.94 Intermediate Liner 7" 26.000 ppf, L-80 BTC, L-80 36.00-18789.00 6.151 #2 4.65 1.26 3.55 1.9 Intermediate 7.1 26.000 ppf, L-80 BTC, L-80 36.00-13,800 6.151 Tieback 1.72 2.02 2.95 2.05 *A Altemate Dlitt CRU CD5-316 APD Page 20 of 31 Printed., 5 -Jul -17 Revised Applicata. ,r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 CRU CD5-316 APD Page 21 of 31 Printed: 5 -Jul -17 CD5-316PBiwo07 Cement Schematic CD5-316PB1wp07 Pro Dosed Pluaback Schematic Plamed Top of Liner 2,000' MDI 1,891' TVD @-40`Inc 16" Open !tole Re coed TOC -8 ]44' MD/4,199TVD (W 8 MD above Albian Sub 9T 12.'L" Open We PI ug 0: 17.0ppg Class G KiafPlug Rained TopdCenent ®13,7W'MDI5,976'TVD Rained Based Cement ®14,358 MD / 6,174' ND High -M. M W RII Plug 02: 15.8ppg Class Isolation Plug Rained Top dCerred &&500' MD I6,86T TVD Planned Based Cement Q17,008 hD I6,WV ND Plus 1f1: 1S8PP9CMss0 Iso! Mion Plug Planned Top OCetmnt ®19,3W'MD/7,392'TVD (Keparuk C Top@ 19,825' MD / 7,458 TVD) Revised Applicatl .yr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 20" Welded Conductor 116 ........................................ 13-W6" 6W L410 HyddI N3 x STC 2,445' MD 12,165' TVD 56°IrrJ222°azi ....................................... ... T' 260 o .BTC4 Tie .Back ..................L-0.......................... 898" 400 L40 BTG -M Liner 13,958 MD 16,041' TVD 71°Inc/225°azi 894" Open Has 19,900' MD /7,518 TVD 75°Inc IIN' azi CRU CD5-316 APD Page 22 of 31 Printed.' 5 -Jul -17 Revised Applicat i ,r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 13-3/8" Surface Casing run to 2,445' MD / 2,185' TVD. Cement from 2,445' MD to 1,945'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1,945' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1,341' MD), zero excess in 20" conductor. Lead slurry from 1,945' MD to surface with DeepCrete @ 11.0 ppg Conductor (115'— 36) X 1.0190 ft3/ft X 1.0 (0% excess) = 81 ft3 Permafrost to Conductor (1,341'— 115 X 0.4206 ft3/ft X 3.5 (250% excess) = 1,805 ft3 Top of Tail to Permafrost (1,945'— 1,3411 X 0.4206 ft3/ft X 1.5 (50% excess) = 381 ft3 Total Volume = 81 + 1,805 + 381 = 2,267 ft3 => 1175sx of 11.0 ppg DeepCrete @ 1.93 W /sk Shoe Joint Tail slurry from 2,445' MD to 1,945' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,445'-1,945D X 0.4206 ft3/ft X 1.50 (50% excess) = 316 ft' Shoe Joint (80� X 0.8407 ft3/ft X 1.0 (0% excess) = 68 ft' Total Volume = 316 + 68 = 384 ft3 => 328sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk 9-5/8" Intermediate liner run to 13.950' MD / 6,041' TVD Top of 12.2ppg Class G extended lead slurry is designed to be at 8,344' MD, which is 500' MD above the top of the Albian Sub 97. Assume 40% excess annular volume. Tack liner shoe with 500' MD of 15.8 ppg Class G tail slurry. Assume 40% excess annular volume. Lead slurry from 13,450; MD to 8,344' MD with 12.2 ppg Class G +additives Top of lead to Top of cement (13,450'— 8,344 X 0.3132 ft3/ft X 1.4 (40% excess) = 2239 ft3 Total Volume = 2239 ft3 => 974Sx Class G + 3% D79, 0.2% D46, 0.35 gps D110 @ 12.2 ppg yielding 2.30 ft3/sk Tail slurry from 13,950' MD to 13,450' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (13,950'-13,450) X 0.3132 ft3/ft X 1.40 (40% excess) = 220 ft3 Shoe Joint (80� X 0.4257 ft3/ft X 1.0 (0% excess) = 34 ft3 Total Volume = 220 + 34 = 254 ft3 => 217sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk CRU CD5-316 APD Page 23 of 31 Printed., 5 -Jul -17 Revised Applicata, jr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 8-3/4" Pilot Hole to 19.900' MD / 7.510' TVD — P&A Open Hole Section Cement from TO to >100' above the top of the Kuparuk C with Class G + Adds. @ 15.8 PPG as per 20 AAC 25.112 (a) (1) (B). Use 50% excess annular volume to account for washout. Cement from TD to 16,500' to 17,000' for openhole isolation with Class G + Adds. @ 15.8 PPG as per 00 No 2 1II. G.l.v). Use 50% excess annular volume to account for washout. Plug to be placed on top of 500' long high- visc gel pill. Pump 17.0 ppg Class G cement up to kick-off point at 13,750' MD on top of a 500' long high-visc. gel pill. Use 50% excess annular volume to account for washout. Plug #1 (Isolation) from 19,900' MD to 19,300' with 15.8 ppg Class G + additives 8-3/4" Open Hole (19,900'— 19,300 X 0.4176 ft3/ft X 1.5 (50% excess) = 376ft3 Total Volume = 376 ft3 => 324 sx of 15.8 ppg Class G @ 1.16 ft3 /sk Plug #2 (Isolation) from 17,000' MD to 16,500' with 15.8 ppg Class G + additives 8-3/4" Open Hole (17,000'— 16,500) X 0.4176 ft3/ft X 1.5 (50% excess) = 313ft3 Total Volume = 313 ft3 => 270 sx of 15.8 ppg Class G @ 1.16 ft3 /sk Plug #3 (Kick-off) from 14,350' MD to 13,750' MD with 17.0 ppg Class G + additives 8-3/4" Open Hole (14,350'— 13,950) X 0.4176 ft3/ft X 1.5 (50% excess) =251W 9-5/8" Casing (13,950'— 13,750) X 0.4257 ft3/ft X 1.0 (0% excess) = 85 ft3 Total Volume = 251 + 85 = 336 ft3 => 336 sx of 17.0 ppg Class G + additives @ 1.00 ft3/sk CRU CD5-316 APD Page 24 of 31 Printed: 5 -Jul -17 CD5-316wp03.1 Proposed Casino Schematic Revised ApplicatI jr Permit to Drill, Well CRU CD5-316 Saved: 5Jul-17 M' Hd0 Welded Conduclor -................ 6 ................ Mann Top of 9318" Liner 200Y MD 1 1,891 TVD @-40- Irr, 1613�8" 6MHyddIN3 xBTC 16"Open We 2,*IT/2,I W / 2, IW'TVV L .... Wln�u-.zi ... ..... ... ............. .........T..'..2.6.L.ABC-M .Te B..a..c.k ..... Flamed TOC -8,344• MD14,189rTV0 (50V MOabove Aftan Sub 97) 12 2M Class G I.eA w150011158WgUass Gtal Planned Top ofr Uner 13.80V MD/5.992TVI) 12-'/." Open We 931V -AIN LABBMM Line, 13,9W W 16,041' TWO Planned TOC -1824 ' NO I 7.374 -Wo 15,8M Ct.. G slurry (`AV W above KWarA C) 8W.. 9.71W' Open Hd. F '*i r 20 L-110 BTC -M Liner 18,7W MO 1 7,�Y WD -M. I roll M. azi — ...... ............ -.1. ......... 6-118"Open Hoe : : W �%- 12.6# L -W TXP liner 27.824'MD 17,52 1'TVD L ---- A wiffiperfpWS CRU CD5-316 APD Page 25 of 31 Printed. 5 -Jul -17 Revised Applicata )r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 7" Intermediate liner run to 18.789' MD / 7439' TVD Top of slurry is designed to be at liner top at 18,248' MD, which will 500' MD Kuparuk C. Assume 40% excess annular volume. 9-7/8" underreamer to be 100ft behind the drill bit. Tail slurry from 18,789' MD to 18,248' MD with 15.8 ppg Class G + additives Shoe to top of 8-3/4" Hole (18,789'— 18,689 X 0.1503 ft3/ft X 1.40 (40% excess) =21W 9-7/8" Hole to Top of Cement (18,689'— 18,248 X 0.2646 ft3/ft X 1.40 (40% excess) = 164 ft' Shoe Joint (80� X 0.2148 ft3/ft X 1.0 (0% excess) = 17 ft3 Total Volume = 21+ 164 + 17 = 202 ft3 => 173sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk CRU CD5-316 APD Page 26 of 31 Printed., 5 -Jul -17 Revised Applicafii .r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 7. Drilling Fluid Program Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight from 9.6-10.0 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Intermediate #2: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. CRU CD5-316 APD Page 27 of 31 Printed: 5 -Jul- 17 Surface Intermediate Pilot Hole Intermediate production #1 #2 Hole Size in. 16 12.25 8.75 8.75 x 9.875 6.125 Casing Size in. 13.5 9.625 n/a 7 4.5 Density PPG 9.0-10.0 9.6-10.0 9.6-11.0 9.6-11.0 9.0 PV cP 30-80 10 10 10 10 YP Ib./100 100-200 20-28 20-28 20-28 10- 15 Funnel Viscosity s/qt. 300 50-60 50-60 50-60 40-50 Initial Gels Ib./1000 50 10 10 10 6 10 Minute Ib./100 Gels ftz 60 15 15 15 8 API Fluid cc/30 N.C. — 15.0 5.0 5.0 5.0 4.0 Loss min. HPHT Fluid cc/30 n/a 8.0-12.0 8.0-12.0 8.0-12.0 10.0 Loss min. pH 11.0 9.5-10.0 9.5-10.0 9.5-10.0 9.0-9.5 Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight from 9.6-10.0 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Intermediate #2: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. CRU CD5-316 APD Page 27 of 31 Printed: 5 -Jul- 17 Revised Applicatk ,r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 10.5 ppg with calcium carbonate and KCI. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CRU CD5-316 APD Page 28 o/31 Printed.. 5 -Jul -17 Revised Applicat( jr Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 8. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20AAC25.005 (c)(/4)) Incidental fluids developed from drilling operations on well CRU CD5-316 will be injected into a permitted annulus on the CD5 pad, or the Class 1 disposal well on CDl pad. CRU CD5-316 will not be a viable candidate for annular injection due to the intermediate liner casing design. CRU CD5-316 APD Page 29 o131 Printed. 5 -Jul -17 Revised Applicat( .r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 9. Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 16" Hole 113-3/8" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Gas Hydrates Low If observed — control drill, reduce pump rates and material circulating time, reduce mud temperatures Clay Balling Medium Maintain planned mud parameters and flow rates, proper hole filling, pump out of hole, real time ECD Increase mud weight, use weighted sweeps, monitoring reduce fluid viscosity, control ROP Abnormal Pressure in Low Diverter drills, increased mud weight. Shallow Surface Formations connections, increase mud weight. Shallow hazard hazard study noted minimal risk Lost Circulation Medium Reduce pump rates, mud rheology, add lost Low Monitor ECD and torque/drag trends, control drill circulation material, use of low density cement Pressure and use best hole cleaning practices slurries ort collar, control pipe running seeds 12-1/4" Hole / 9-5/8" Liner Interval Risk Level Event Risk Level Mitigation Strate Lost circulation Low Reduce pump rates, reduce trip speeds, real time trip speeds, sweeps, and real time equivalent ECD monitoring, mud rheology, add lost circulation circulating density (ECD) monitoring, run casing as material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, Reduce pump rates, reduce trip speeds, real time proper hole filling, pump out of hole, real time ECD ECD monitoring, mud rheology, add lost circulation monitoring Abnormal Pressure in Low Well control drills, check for flow during Overburden Formations connections, increase mud weight. Shallow hazard proper hole filling, pump out of hole, real time ECD study noted minimal risk Hole Cleaning Low Monitor ECD and torque/drag trends, control drill Well control drills, check for flow during Pressure and use best hole cleaning practices 8-3/4" Pilot Hole - Casing Interval Event Risk Level Miti ation Strateqy Sloughing shale, Tight High Increase mud weight, control ROP, connection and hole trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure connections increase mud weight Hydrogen Sulfide gas Low HzS drills, detection systems, alarms, standard well CRU CD5-316 APD Page 30 of 31 Printed., 5 -Jul -17 Revised Applicatl. ,r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 control practices, mud scavengers 8-3/4" x 9-7/8" Hole / 7" Liner - Casina Interval Event Risk Level Mitigation Strategy Sloughing shale, Tight High Increase mud weight, control ROP, connection and hole trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as Hole swabbing on trips Medium liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation Abnormal Reservoir Low material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, Differential Sticking Low proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure I connections increase mud weight Hydrogen Sulfide gas Low HzS drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole / 4-1/2" Pre -Perforated Liner - Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure connections increased mud weight Differential Sticking Low Uniform reservoir pressure along lateral, keep pipe moving, control mud weight Hydrogen Sulfide gas Low HzS drills, detection systems, alarms, standard well I control practices, mud scavengers CRU C05-316 APD Page 31 of 31 Printed.. 5 -✓u1-17 Revised Applicatl ir Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach in the pilot and intermediate 42 hole sections will require higher mud weights than historically used to enhance wellbore stability. Managed Pressure Drilling will be used in conjunction with a 4 -string casing design to mitigate shale instability in the aforementioned formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks CRU CD5-316 APD Page 32 of 31 Printed: 5 -Jul -17 10. Proposed Completion Schematic CD5-316wp03.1 Proposed Completion Schematic 20• H40 welded conductor 115' ;i 134316" 806 LA0 Hydni 463 a BTG -M 2.445' MD 12,165' TVD 56-Inr1222"all 18" Open Hole ]" 2611 L40 Tie Back BTC -M T' 20 L40 BTL -M 10]00'MD/ 7.437WD 06'Indl73°aai Revised Applicad ,r Permit to Drill, Well CRU CD5-316 Saved: 5 -Jul -17 Upper Completion: Length 1) 4-11V 12.6#Rt TXP 2) 3.813"X Nipple 3) 4-%" x 1" Camco KBMG GLM (xx') w/DCK2 7' pinned for 2500 psi casing to lbg shear 4) XN nipple 3.813" ID 1.5' 5) WLEG with seals 1.5' Lower Completion: 6) ZXP Liner Top Packer & Flexlock Liner Hanger 37' XO 5" Hydril 521 Box X 4-%' IBTM pin 7) XN nipple 3.735" ID 1.5' 8) 4 %", 12.6#/ft, L-80 IBT-M/SLHT Liner Pert pups and swell packers as necessary 94/8" 4011 L40 BTC -M Dner 13.050' MD / 6,041TVD 71°Inc /225'axi 4-%" 12.6# L-80 H563 Tubing V/V' 12.6# L-810 TXP Production Liner \\ Top of liner 618,600' MD / 7,422' TVD \ Liner shoe @27,800' MD \ \ 6.118" Open Hole \ \ 2].624'MD/7,521'TVD \ \\ \\ `O O O O O O O O I \ ___________________________- CRU CD5-316 APD Page 33 of 31 Printed. 5 -Jul -17 Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Wednesday, July 05, 2017 11:12 AM To: Dai, Weifeng Subject: RE: CD5-316 (PTD # 217-040) PTD Update Please submit this revised PTD in duplicate to our office as soon as possible. The revised PTD should be marked "Revised" in the upper right hand corner. Changes should be highlighted in yellow as you have done. A revised 10-401 should also be submitted. Thanx, Victoria From: Dai, Weifeng[mailto:Weifeng.Dai@conocophillips.com] Sent: Wednesday, July 05, 2017 11:07 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: CD5-316 (PTD # 217-040) PTD Update Hi Victoria, ConocoPhillips apply to make a couple of changes in the approved CD5-316 PTD as described below. I enclosed the update PTD drilling program part, the changes are highlighted in yellow. Below is the quick summary of the changes as well. 1. Page 9, step 11, ConocoPhillips apply to lower the minimum acceptable LOT/FIT to 12.0 ppg EMW at 13-3/8" surface casing shoe, ConocoPhililps still plan to cap the max FIT at 18.0 ppg EMW just for fracture gradient data acquisition purpose. 2. In page 9, step 21, ConocoPhillips apply to lower the minimum acceptable FIT to 12.5 ppg at 9-5/8" intermediate 1 liner shoe and we plan to stop FIT at 12.5 ppg EMW since this well is not a candidate well for annular disposal. 3. In page 9, step 13, ConocoPhillips apply to add NEU/DEN/NMR log in 12-1/4" intermediate 1 section, and step 22, add NEU/DEN log in pilot hole. 4. In page 9, step 15 and in page 10, step 26, ConocoPhillips apply variance to only test the changed VBR prior to casing/liner run other than full BOP test. 5. In page 9, step 10 and step 20, test casing pressure to 3,000psi other than 3,500psi. The updated predicted pore pressure is 3,350 psi which is lower than the originally predicted pore pressure and subsequently lower anticipated surface pressure. 6. Page #10 and #28, lower to mud weight for production section to 9.0 ppg due to depleted sand pore pressure. All the changes still make the well design meet the requirement/regulation of AOGCC, the primary reason for the changes is the updated lower pore pressure, which result in lower FIT/LOT requirement and lower casing testing pressure, other changes are related to added logging tool and reduced MW for production section. Please review the requested changes and let me know if you have any questions. I appreciate your prompt response as we are scheduled to spud the well in 10 days or so. Weifeng Office: ( 907)-263-4 324 Cell Phone: (907)-342-9508 Loepp, Victoria T (DOA) From: Dai, Weifeng <Weifeng.Dai@conocophillips.com> Sent: Friday, July 07, 2017 8:21 AM To: Loepp, Victoria T (DOA) Cc: Regg, James B (DOA) Subject: RE: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Attachments: Kill-Specifications.pdf, Kill - Data Book.pdf,, Choke-Specifications.pdf, Choke - Data Book.pdf Victoria, Please check the attached the choke and kill hose data books for your review. The rated temperature, mfg safety factor and pressure test charts and rating are included. Please let me know if you need anything else. Weifeng Office: (907)-263-4324 Cell Phone: (907)-342-9508 From: Loepp, Victoria T (DOA) imailto:victoria.loepp@alaska.gov] Sent: Thursday, July 06, 2017 1:28 PM To: Dai, Weifeng<Weifeng.Dai@conocophillips.com> Cc: Regg, James B (DOA) <jim.regg@alaska.gov> Subject: [EXTERNAL] CRU CD5-316(PTD 217-040) Co -flex hoses Weifeng, Please provide specifications(temperature and pressure ratings) and testing data on the Coflex line hoses proposed for the choke and kill -line sides of the BOP stack. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. LoeooCdalaska. cov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding if, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loeoo@alaska.aov ContinentalContiTech Oil & Marine, Corp. 11535 Brittmoore Park Drive Houston, Texas 77041 Tel. +1 (832) 327 0141 email: sales@fluid.contttech.us Fax. +1 (832) 327 0148 website: www.contitechoil-marine.us Choke and Kill Temp B Customer Name Doyon Dnlling Contact Bruce Spittler Customer Enquiry No. RFQ ContiTech Beattie Enquiry No. 20002037 Revision Line No. 1 Description 2" x 22ft, 5000psi Choke and Kill Service Hose, Temperature Range B, API Spec 16C, Tag No. Qty 1 Hose Specification Service Choke and Kill Bore Size 2" Length 22 Feet Working Pressure 5000 psi Test Pressure 10000 psi Safety Factor 3 Temperature Range -20 to 1009; Design Standard API Spec 16C - Monogrammed Constuction Fire rated (Lloyds OD 1000/499 @ 700 Deg C For Minimum 30 Minutes) Outside Diameter 128 mm Hose Weight 29 kg per metre MBR (Storage) 0.9 m MBR (Operation) 0.9 m Sour Service Yes End A End B Fitting Type Flange, API Spec. 6A Fitting Type Flange, API Spec. 6A Formation Butt Welded Formation Butt Welded Groove Inlay Stainless Steel 316 Groove Inlay Stainless Steel 316 Bore Size 3" Bore Size 3" End Fitting Size 3.1/8" End Fitting Size 3.1/8" Type 6B Type 6B Ring Groove R35 Ring Groove R35 Sour Service To NACE MROt-75 Latest Rev Sour Service To NACE MR01-75 Latest Rev Arrangement Drawing I- - 22 Feet Quote Ref: 20002037/1 (End) Page 3 i Confinenidl + CONTITECH ContiTech Oil & Marine, Corp. 11535 Brittmoore Park Drive Houston, Texas 77041 Tel. +1(832)3Tr 0141 email: sales@fluid.contitech.us Fax.+1 (832) 327 0148 website: www.contitech-oil-marine.us Choke & Kill Hose (Smooth Bore) Customer Name Doyon Drilling Contact Bruce Spittles Customer Enquiry No. Alaska Con6Tech Beattie Enquiry No. PBC15568 Revision 10000 psi Line No. 1 Description 3" x 20ft, 5000psi Choke and Kill Service Hose, Temperature Range B, API Spec 16C, Tag No. API Spec 16C - Monogrammed Qty 1 Hose Specification Service General Choke and Kill Service Bore Size 3" Length 20 Feet Working Pressure 5000 psi Test Pressure 10000 psi Safety Factor 3 Temperature Range -20 to 100°C Design Standard API Spec 16C - Monogrammed Constuction Fire rated Outside Diameter 177 mm Hose Weight 46 kg per metre MBR (Storage) 1.5m MBR (Operation) 1.6 m Sour Service Yes End A End B Fitting Type Flange, API Spec 6A Fitting Type Flange, API Spec, 6A Formation Butt Welded Formation Butt Welded Groove Inlay Stainless Sted 316L Grove Inlay Stainless Steel 316L Bore Size 3" Bore Size 3" End Fitting Size 3.1/8" End Fitting Size 3.1/8" Type 6B Type 6B Ring Groove R35 Ring Groove R35 Sour Service To NACE MR01-75 Latest Rev Sour Service To NACE MR01-75 Latest Rev Arrangement Drawing 20 TRANSMITTAL LETTER CHECKLIST WELL NAME( PTD: Development ✓ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: JLd/L kV�_U- POOL: 1/i�/� i/� l� /(1i < �� Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter Revised 5/2013 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIVUV UNLCDS 316 Program SER Well bore seg ❑ PTD#:2170400 Company CONOCOPHILLIPS ALASKA, 1N Initial Class/Type _ SER _/ WAGIN GeoArea 890 _ Unit 50369 On/Off Shore On Annular DisDosal Appr PKB 1 2 3 4 5 6 7 8 9 10 Date 11 7/7/2017 12 13 14 15 16 Nonconven, gas conforms to AS31.05.030Q.1.A),(j.2.A-D) _ _ _ _ _ _ NA Conductor string provided Permit fee attached _ _ _ _ NA. Surface casing protects all known USDWs Lease number appropriate Yes Fee00NPRA4, Surf; AA0092347; AA0092344;_AA0081817, Top Prod; AA0094165; AA0094167, TD.... Unique well name and number Yes CRU CD5-316 and CD5-316PH-1.. Planned pilot hole to be drilled to locate. top Kuparuk C & assess. pay thickness Well located in. a. defined pool.. Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by Conservation Order No. 443C. _ Well located proper distance from drilling unit boundary. Yes CO 443D contains no spacing restrictions with. respect to drilling unit boundaries. Well located proper distance from other wells. Yes _ _ _ _ CO 443D has no interwell.spacing restrictions.. Sufficient acreage available in. drilling unit Yes If a re -drill, has a 10-403 for abandonment been approved If deviated, is wellbore plat included Yes Adequate wellbore separation proposed Operator only affected party Yes Wellbore will be more than 500' from an external property line where ownership or landownership changes. Operator has. appropriate bond in force Yes Drilling fluid. program schematic & equip list adequate Permit can be issued without conservation order Yes BOPEs, do they meet regulation Permit can be issued without administrative approval Yes ROPE press rating appropriate; test to (put psig in comments) Can permit be approved before 15 -day wait Yes Choke. manifold complies w/API RP -53 (May 84) Well located within area and strata authorized by Injection Order # (put. 104 in comments) (For Yes AID 18D _ All wells within 1/4 mile area.of review identified (For service well only) _ Yes No wells within 1/4 mile radius.. Closest well is CD5-314x more than. 1. mile away. Pre -produced injector; duration of pre production less than 3 months (For. service well only) No Well will be flowed back for clean-up only. (Earhart:. 3/22/17). Yes 79' conductor set Yes 2445' and Yes 158%. excess No No. Productive interval will be completed with uncemented per' pup liner Yes Yes Rig has steel tanks; all waste to approved disposal wells. NA Yes Anti -collision analysis complete; no major risk failures Yes Diverter waiver grantee AAC 25.035(h)(2) _ Yes Max formation pressure is 3350 psig(8.7 ppg EMW); will drill w/ 9.0-11.0 ppg EMW Yes Yes MPSP is 2606 psig; will test BOPs to 3500 psig Yes Yes Yes H2S measures required Yes No wells within 1/4 mile radius No H25 measures required. Yes Expected reservoir pressure is 8,8-9.0 ppg EMW; will be drilled using 9.0 to 11.0 ppg mud. NA Horizontal production interval to be drilled using 9.0 ppg mud. 7' csg shoe to be set at 18,789' MD. NA Top Kuparuk C sandestimated at 18,748' MD. NA Onshore service well, to be drilled. _ Geologic 18 Conductor string provided Engineering 19 Surface casing protects all known USDWs Com 20 CMT vol adequate to circulate on conductor & surfcsg 21 CMT vol adequate to tie-in long string to surf csg �� /� 22 CMT will cover all known. productive horizons 23 Casing designs adequate for C,. T, B & permafrost 24 Adequate tankage or reserve pit 25 If a re -drill, has a 10-403 for abandonment been approved 26 Adequate wellbore separation proposed 27 If diverter required, does it meet regulations. Appr Date 28 Drilling fluid. program schematic & equip list adequate VTL 7/6/2017 29 BOPEs, do they meet regulation 30 ROPE press rating appropriate; test to (put psig in comments) 31 Choke. manifold complies w/API RP -53 (May 84) 32 Work will occur without operation shutdown 33 Is presence of H2S gas probable 34 Mechanical. condition of wells within AOR verified (For service well only) 35 Permit can be issued w/o hydrogen sulfide measures Geology 36 Data presented on potential overpressure zones Appr Date 37 Seismic analysis of shallow gas. zones PKB 7/7/2017 38 Seabed condition survey (if off -shore) 39 Contact name/phone for weekly progress reports [exploratory only] Yes 79' conductor set Yes 2445' and Yes 158%. excess No No. Productive interval will be completed with uncemented per' pup liner Yes Yes Rig has steel tanks; all waste to approved disposal wells. NA Yes Anti -collision analysis complete; no major risk failures Yes Diverter waiver grantee AAC 25.035(h)(2) _ Yes Max formation pressure is 3350 psig(8.7 ppg EMW); will drill w/ 9.0-11.0 ppg EMW Yes Yes MPSP is 2606 psig; will test BOPs to 3500 psig Yes Yes Yes H2S measures required Yes No wells within 1/4 mile radius No H25 measures required. Yes Expected reservoir pressure is 8,8-9.0 ppg EMW; will be drilled using 9.0 to 11.0 ppg mud. NA Horizontal production interval to be drilled using 9.0 ppg mud. 7' csg shoe to be set at 18,789' MD. NA Top Kuparuk C sandestimated at 18,748' MD. NA Onshore service well, to be drilled. _ Geologic Engineering Public Revision: Change in maximum pore pressure and MPSP. 7/6/17 VTL Commissioner: Date: Com Date Date Commissioner Date �� /� DTS CPF HF THE STATE 01ALl SSA GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-316 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-040 Alaska Oil and Cas Conservation Commission Surface Location: 380' FNL, 2728' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 248' FNL, 1977' FEL, SEC. 2, T1 ON, R3E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.claska.gov Enclosed is the approved application for permit to drill the above referenced service well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name CRU CD5-316PH and API number 50-103-20756-70- 00 from records, data and logs acquired for well CRU CD5-316 Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. Foerster Chair DATED this l day of April, 2017. t STATE OF ALASKA AL ,A OIL AND GAS CONSERVATION COMM JN PERMIT TO DRILL 20 AAC 25.005 RECEIVED MAR 2 0 2011 1a. Type of Work: Y74a 1b. Proposed Well Class: Exploratory - Gas Service - WAG Service - Disp ❑ 1 c. Spec w o s for: Drill F±1 ' Lateral ❑ Stratigraphic Test ❑ Development - Oil ❑ Service - Winj [ Single Zone ❑� Coalbed Gas Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply U Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑✓ Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 ' CRU CD5-316 , 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27824 TVD: 7521 Colville River Unit Alpine Pool . 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 380' FNL 2728' FEL Sec. 18 TI IN R4E, UM ' ASRC-NPR4, AA092M7, A 092344pA081817, A N4165, WN167 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1849' FNL 3139' FEL Sec. 26 T11 N R3E, UM 932669, 340758, 340757, 932552, 356606, 366608 5/15/2017 Total Depth: 0 9. Acres in Property: 14. Distance to Nearest Property: 248' FNL 1977' FEL Sec. 2 T10N R3E, UM 15912, 1280, 3122, 2525, 5120, 2556 5031' to AA081797 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.8 15. Distance to Nearest Well Open Surface: x-349250 y-5965835 Zone -4 GL Elevation above MSL (ft): 34 to Same Pool: 11,512' from CD5-315 16. Deviated wells: Kickoff depth: 400 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 4070 • Surface: 3326 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling I Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 79 36 36 115 115 10 yds. 16" 13.375" 68 L-80 H-563/BTC 2409 36 36 2445 2185 1175 ex 11.0 ppg DeepCmte, 328 sx 15.8 ppg G 12.25" 9.625" 40 L-80 BTC -M 11950 2000 1891 13950 6041 974 sx 12.2 ppg G; 217 sx 15.8 ppg G 8.75" 7.0" 26 L-80 BTC -M 18753 36 36 18789 7439 173 sx 15.8 ppg G 6.125" 4.5" 12.6 L-80 TXP 9200 18600 7422 27800 7521 uncemented pert pup liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report p Drilling Fluid Program ❑v 20/AAC 25.050 requirements❑ 21. Verbal Approval: Commission Representative: Date f-- -T' 7. - n 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Will Earhart 2651077 be deviated from without prior written approval. Contact William.C. Earhart(cDcop.com Email Printed Name Chip Alvoord Title Drilling Manager Signature Phone 265-6120 Date 3 (io 12s I i Commission Use Only Permit to Drill API Number:Permit Approva See cover letter for other Number: —Q 50- Q - �Q—Qb Dale: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Ocher: ov P rC,1 �.- �0 3 Sb O !� $� 5 � / a Z� Sam Ip e; �eq'd: Yes j No 19 Mud log req'd: Yes ❑ Nog UHZLS�%mea�res: r n vtl Yes No❑,f Directional svy req'd: Yes 10, No 1` �� Y ✓ v4t 1 /1(/ Inclination /a -only svy req'd: Yes[:] NoL Dt vc 1 / cr W a d vIr r ro " / 7 `1 pang caption req'd: Yes ❑ N, �, CZ initial inject MIT Yes No❑ U 3 5 01 4p req'd: CJ r L CPost P -C r 2 L) if 1- C ,2 p0iflDYI %J/6df' Cf-tivZ I ✓b tG V,� ©V SIUGI�vI jl%CI'%rt t tiYlor t� y}1D l�iG'. tN lCfil� bG'GCrt'!%�I J / APPROVED BY `— Approved by COMMISSIONER THE COMMISSION Date -&-17 'r]1 fJievised ^ 0 {��%�iQ-��� f. Submit Form aRe Form 10-407 evisetl /2015) h e IH1• months from the date of approval (20 AAC 25.005(8)) Attachments in Duplicate ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 March 20, 2017 Alaska Oil and Gas Conservation Commission 333 West 71' Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-316 Dear Sir or Madam: ConocoPhillips ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore water -alternating -gas (WAG) injection well from the CD5 drilling pad. The intended spud date for this well is May 15, 2017. It is intended that Doyon Rig 19 be used to drill the well. CRU CD5-316 is planned to be a horizontal Kuparuk C sand WAG injector. The 16" surface hole will TD above the C-30 sand and then 13-3/8" casing will be set and cemented to surface. The intermediate hole will be drilled in two sections to mitigate issues with shale instability over the long interval. The 12-1/4" intermediate #1 section will be drilled into the Albian sequence and landed at an inclination of —71 °. A 9-5/8" drilling liner will be set and cemented from TD to secure the shoe and cover 500' above any hydrocarbon -bearing zones. A planned 8-3/4" pilot hole will then be drilled out of the 9-5/8" shoe down to the Kuparuk C sand to locate the formation top and assess the pay thickness. The pilot hole will subsequently be plugged back to the 9-5/8" liner shoe. ✓ The second intermediate will then kick-off the pilot plugback with a 8-3/4" x 9-7/8" drilling assembly, ultimately landing in the Kuparuk C sand. Managed Pressure Drilling technology will be utilized to assist with providing stability through the HRZ, Kalubik, and Miluveach formations. This interval will build from 71to 86° inclination. The section will be cased with a 7" cemented liner and tied -back to surface on a subsequent run with a 7" string. The production interval will be comprised of a 6-1/8" horizontal hole that will be geo-steered in the Kuparuk C sand. The well will be completed as a WAG injector with a 4.5" liner with pre -perforated pup joints and tied back to surface with a 4.5" tubing upper completion string. It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, there has not been a _ significant indication of shallow gas or gas hydrates through the surface hole interval. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 ACC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setup. If you have any questions or require further information, please contact Will Earhart at 265-1077 (William.C.Earhart(&coa.com) or Chip Alvord at 265-6120. Sincerely, cc: CDSWell File/ Ann Haggerty -Sherrod ATO 10 Johnson son Njoku ATO 172720 Chip Alvord ATO 1570 Will Earhart Jason McLennan ATO 1790 Drilling Engineer Lanston Chin Kuukpik Corp Applicati r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CRU CD5-316 Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (f))............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................ 3 Requirementsof 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (e)(4)) ........................ 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c) (5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of20AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of20 AAC 25.005(c)(8)) ....................................6 9. Abnormally Pressured Formation Information (Requirements of20AAC 25.005 (c)(9)) ................................................................................................................................... 8 10. Seismic Analysis (Requirements of20AAC 25.005 (c)(10)) .........................................8 11. Seabed Condition Analysis (Requirements of 20AAC25.005 (c)(11)) ........................ 8 12. Evidence of Bonding (Requirements of'20AAC25.005(c)(12))................................... 8 13. Proposed Drilling Program (Requirements of 20AAC25.005 (c)(13)) .........................8 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ..................... 10 (Requirements of 20 AAC 25.005(c)(14))........................................................................... 10 15. Attachments........................................................................................................... 11 Attachment 1 Cement Summary ............................................................................................................. 112 CRU CD5-316 Page 1 of 21 Printed: 20 -Mar -17 Attachment 2 Drilling Hazards Summary .... Attachment 3 Completion Schematic........... Attachment 4 Area of Review ....................... Attachment 5 Directional Plan ................... Applicad r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CRU CD5-316 Page 2 of 21 Printed., 20 -Mar -17 Applicatil r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 1. Well Name (Requirements of 20 AAC 25.005 (0) The well for which this application is submitted will be designated as CRU CD5-316. 2. Location Summary (Requirements of20AAC25.005(c)(2)) This well is planned for: Location at Surface 380' FNL, 2728' FEL, Sec. 18, Tl IN, R4E, UM NAD 1927 RKB Elevation 70.8' AMSL Northings: 5,965,835 Total Vertical Depth, RKB: 7,439' Total Vertical Depth, SS: 7,368' Eastings: 349,250 Pad Elevation 34.0' AMSL Location at Top of Productive Interval (Heel) 1849' FNL, 3139' FEL, Sec. 26, Tl IN, ME, UM NAD 1927 Northings: 5,954,028 Eastings: 338,387 Measured Depth, RKB: 27,824' Measured Depth, FKB71 18,789' Total Vertical Depth, RKB: 7,439' Total Vertical Depth, SS: 7,368' Location at Total Depth (Toe) 248' FNL, 1977' FEL, Sec. 2, T10N, ME, UM NAD 1927 Northings: 5,945,048 Eastings: 339,367 Measured Depth, RKB: 27,824' Total Vertical Depth, RKB: 1 7,521' Total Vertical De th, SS: 7,450' Requirements of20 AAC 25.050(b) Please see Attachment 1: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD4, there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. Please reference BOP schematics on file for Doyon 19. ✓ CRU CD5-316 Page 3 of 21 Printed: 20 -Mar -17 Applicad 4. Drilling Hazards Information (Requirements of20AAC25.005(c)(4)) r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size (in) Csg Setting Depth MD/TVD (ft) Fracture Gradient (ppg) Pore pressure (psi) ASP Drilling (psi) 20 115 / 115 10.9 52 54 13.375 2445/2185 14.5 977 1429 9.625 13950/6041 16.5 2701 3326 7 18789/7439 12.5 4070 3318 4.5 27824/7521 12.5 4070 N/A PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing at with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to\t�su ace as follows: 1) ASP= [(FG x 0.052) - 0.1]D J q/ o 06 0h Where: ASP = Anticipated Surface pressure in psi 0 FG = Fracture gradient at the casing seat in Ib/gal 0.052 = Conversion from lb/gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below conductor casing (20") ASP = [(FG x 0.052) - 0.1] D _ [(10.9 x 0.052) - 0.1] x 115 = 54 psi OR ASP = FPP - (0.1 x D) = 977 - (0.1 x 2185) = 759 psi 2. Drilling below surface casing (13-3/8") ASP = [(FG x 0.052) - 0.1] D = [(14.5 x 0.052) - 0.1] x 2185 = 1429 psi OR ASP= FPP -(0.1 xD) = 2701 - (0.1 x 6041) = 2097 psi 3. Drilling below intermediate liner (9-5/8") ASP = [(FG x 0.052) - 0.11 D = [(16.5 x 0.052) - 0.11 x 6041 = 4579 psi OR ASP = FPP - (0.1 x D) = 4070 - (0.1 x 7521) = 3326 psi CRU CD5-316 Page 4 of 21 Printed: 20 -Mar -17 4. Drilling below intermediate casing (71') iO Applicati( r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 ASP = [(FG x 0.052) — 0.1] D = [(12.5 x 0.052) — 0.1] x 7439 = 4091 psi ASP= FPP—(0.1 xD) = 4070 — (0.1 x 7439) = 3318 psi (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally gea pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csglfbg Hole Size Weight Grade Conn. C Length Top MD/TVD Btm MDlrVD Cement Program OD (in) (ib/ft) (R) M (n) in 20 42 94 H-40 Welded 79 Surf 114/114 Previously installed Hydril Cement to Surface with 13-3/8 16 68 L-80 563/ 2,409 Surf 2,445/ 2,185 1175 sx DeepCrete Lead at 11.0 ppg, BTC -M 328 sx Class G Tail Slurry at 15.8 ppg 974 sx Class G Lead at 12.2 ppg w/ TOC at 9-5/8 12-1/4 40 L-80 BTC -M 11,950 2,000 / 1,891 13,950 / 6,041 8,344' MD (Albian Sub 97 Isolation) 217 sx Class G Tail at 15.8 ppg n/a 8-3/4 n/a n/a n/a 5,950 13,750 J 5,976 19,900 / 7,510 Plug 1: 324 sx Class G at 15.8 ppg (Pilot) Plug 2: 336 sx Class G at 17.0 ppg 7 6 x 8- 26 L-80 BTC -M 18,753 Surf 18,789 / 7,439 173 sx Class G 15.8 ppg cemented to liner 1/2 top at 18,248' MD 4-1/2 n/a 12.6 L-80 Hydril 563 18,564 Surf 18,600 / 7,422 n/a 41/2 6 12.6 L-80 TXP 9,200 18,600 / 7,422 27,800 / 7,521 Uncemeneted open hole liner w/ pre - perforated pup joints 7. Diverter System Information (Requirements of20AAC25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2) is granted. This will be the 19" penetration on CD5 pad. There has been no significant indication of shallow gas or gas hydrates through the surface hole interval to date on CD5. ikt - _ _ , p A mO It CRU CD5-316 Page 5 of 21 Printed: 20 -Mar -17 Applicatii r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 S. Drilling Fluid Program (Requirements q(20AAC25.005(c)(8)) Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight 510.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight from 9.6-10.0 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Intermediate #2: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. CRU CD5-316 Page 6 of 21 Printed: 20 -Mar -17 Surface Intermediate Pilot Hole Intermediate Production #1 #2 Hole Size in. 13.5 9.875 x 11 8.75 8.75 x 9.875 6.125 Casing Size in. 10.75 7.625 n/a 7 4.5 Density PPG 9.0-10.0 9.6-10.0 9.6-11.1 9.6-11.1 10.5 PV cP 30-80 10 10 10 10 YP Ib./100 100-200 20-28 20-28 20-28 10- 15 Funnel s/qt. viscosity 300 50 -60 50-60 50-60 40-50 Initial Gels Ib./100 50 10 10 10 6 10 Minute Ib./100 Gels ftz 60 15 15 15 8 API Fluid cc/30 N.C. — 15.0 5.0 5.0 5.0 4.0 Loss min. Fluid c n/a 8.0-12.0 8.0-12.0 8.0-12.0 10.0 LOSS min. Loss min. PH 11.0 9.5-10.0 9.5-10.0 9.5-10.0 9.0 — 9.5 Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight 510.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. Maintain mud weight from 9.6-10.0 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. Pilot Hole: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Intermediate #2: Fresh water polymer mud system. Ensure good hole cleaning by maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Ensure adequate LCM material is available on location and in the field to address any expected losses. Maintain mud weight from 9.6-10.3 ppg. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. CRU CD5-316 Page 6 of 21 Printed: 20 -Mar -17 Applica6 r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 10.5 ppg with calcium carbonate and KCI. Diagram of Doyon 19 Mud System on file. J Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CRU CD5-316 Page 7 of 21 Printed: 20 -Mar -17 Applicad �r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 9. Abnormally Pressured Formation Information (Requirements of20AAC25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20AAC25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of20AAC25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of20AAC25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. MIRU Doyon 19 onto CRU CD5-316. 2. Rig up and test riser, dewater cellar as needed. 3. Drill 16" hole to the surface casing point as per the directional plan. ((LVD Program: GR). 4. Run and cement 13-3/8" surface casing. 5. Install BOPE with the following equipment/configuration: 13-5/8" annular preventer, 3-1/2" x 6" VBR, blind ram and 3-1/2" x 6" VBR. 6. Test BOPE to 250 psi low / 3500 psi high (24 hr. AOGCC notice). 7. Pick up and run in hole with 12-1/4" drilling BHA to drill intermediate #1. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out shoe track and 20' of new hole. 10. Perform LOT to maximum EMW of 18.0 ppg. Minimum LOT required to drill ahead is 14.0 ppg EMW. 11. Displace well to 9.6 ppg LSND mud. 12. Drill 12-1/4" hole to the casing point in the Albian at--13,950ft MD. (I "Program: GR/RES). 13. Circulate wellbore clean and POOH. 14. Change upper VBRs to 9-5/8" solid body rams. Test same to 250 psi low / 3,500 psi high 15. Run 9-5/8" liner with hanger and liner top packer. 16. Pump single stage cement job to isolate the Albian Sub97 or uppermost hydro -carbon bearing zone. Set liner top packer. 17. Change upper 9-5/8" solid body rams to 3-1/2" x 6" VBRs. Test BOPE to 250/3500 psi. 18. Pick up and run in hole with 8-3/4" drilling BHA to drill intermediate pilot hole. 19. Chart casing pressure test to 3500 psi for 30 minutes. 20. Drill out shoe track and 20' of new hole. 21. Perform LOT to maximum EMW of 18.0 ppg. Minimum LOT required to drill ahead is 13.5 ppg EMW. CRU CD5-316 Page 8 of 21 Printed: 20 -Mar -17 Applicatil .r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 22. Drill 8-3/4" hole to section TD of-19,800ft MD to extend logging package across Kuparuk C sand. (LWD Program: GR/RES). J 23. P&A 8-3/4" pilot open hole by pumping 15.8 ppg Class G cement plugs from TD to 100ft MD above Kuparuk C sand top or other hydrocarbon bearing zones. 24. Pump 17.0 ppg cement kick-off plug on top of a high-visocity bentonite pill to bring cement 200ft inside of casing. 25. Test BOPE to 250 psi low / 3,500 psi high. (24 hr. AOGCC notice) 26. Pick up and run in hole with the 8-3/4" x 9-7/8" rotary steerable system and run in hole. 27. Drill hole to intermediate #2 casing point into the Kuparuk C sand using Managed Pressure Drilling to maintain constant bottom hole pressure on connections. (LWD Program: GR/RES). ,/ 28. Change upper VBRs to 7" solid body rams. Test same to 250 psi low / 3,500 psi high 29. Run in hole with 7" liner on 5" drill pipe to section TD. Circulate and condition mud in preparations for cementing. 30. Cement 7" liner to 500' above hydrocarbon bearing zones. Set liner top packer. 31. Run 7" tie -back. 32. Displace 9-5/8" x 7" annulus to corrosion inhibited brine and diesel freeze protect. Test tie -back seals. 33. Change upper rams to 3-1/2" x 6" VBR's. Test BOPE to 250 psi low / 3,500 psi high. 34. Pick up and RIH with 6-1/8" drilling assembly. Verify top of cement with sonic tool in recorded mode. (LWD Program: GR/Azimuthal RES/ Sonic for TOC evaluation). / 35. Chart casing pressure test to 3500 psi for 30 minutes. 36. Drill out and perform FIT to 12.5. Minimum acceptable leak -off for drilling ahead is 11.5 ppg EMW. 37. Drill 6-1/8" horizontal section to TD. 38. Pull out of hole with drilling BHA. 39. RIH with 4.5" liner with pre -perforated pup joints on 4"drill pipe. 40. Set liner top packer and release from liner. 41. Displace well to kill weight brine. 42. Run 4.5" upper completion. 43. Space out and land hanger. 44. Install 2 -way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 45. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 -way check. 46. Test tubing and tubing -casing annulus separately to 3500 psi / 30 mins. 47. Shear circulation valve in GLM. 48. Circulate tubing to diesel and install freeze protection in the annulus. 49. Set BPV and secure well. RDMO. CRU CD5-316 Page 9 of 21 Printed: 20 -Mar -17 Applicatii r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of20AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CRU CD5-316 will be injected into a permitted annulus on the CD5 pad, or the Class 1 disposal well on CDl pad. J CRU CD5-316 will not be a viable candidate for annular injection due to the intermediate liner casing design. -'� CRU CD5316 Page 10 of 21 Pdnted.., 20 -Mar -17 15. Attachments Attachment I Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Area of Review Attachment 5 Directional Plan Applicati, r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CRU CD5-316 Page 11 of 21 Printed: 20 -Mar --17 Attachment 1 — Cement Summary Applicati( r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CRU C05-316 Page 12 o/21 Printed: 20 -Mar -17 Applicati( r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CD5-316wn03.1 Primary Cementing Schematic: CDS-316wp03.1 CRU CD5-316 Page 13 of 21 Printed: 20 -Mar -17 Applicatit r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 CD5-316PB1wp07 Pilot Hole Plugback Cementing Schematic: CD5-316PB1wp07 Proposed Plugback Schematic 20" Hoo Welded Conductor Planned Top of Liner 2,000' MOI 1,891' ND @-40°Inc - 689 L40 Hydrit 134182,445' MD 12.185' TVD BTG 16' Open Hole ___...... 58° InU222°az.i ................. Planned TOC -8,344' M13/4,187TVD -. (500MD above Plbian Sub W) 12,W' Open Hole 7- 20 L40 STC -M Tle Back ............................................. Plug 02: 17.Oppg Class G Kick43K Plug V` Mill" 4011 L40 BTC4 Liner Planned Top o/Cement @14,350MID 16.18'ND -' 13,950'Inr=5-opd Planned Base of Cement @14,3$D'MD/8,174'ND ` ' ii°Inc 235°azi Plug fl: 15.8ppg Class G Isolation Plug Planned Tap of Cement 019,300' MD / 7,392' ND (Kupamk C Top@ 19,625' MD 17,450' ND) 84/X' Open Hole 19,900' MD 17,510- ND 75' Inc 1155' an CRU CD5-316 Page 14 of 21 Printed: 20 -Mar -17 Applicad r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 13-3/8" Surface Casing run to 2.445' MD / 2,185' TVD. Cement from 2,445' MD to 1,945'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1,945' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1,341' MD), zero excess in 20" conductor. Lead slurry from 1,945' MD to surface with DeepCrete @ 11.0 ppg Conductor (115'- 36) X 1.0190 ft3/ft X 1.0 (0% excess) = 81 ft3 Permafrost to Conductor (1,341'- 115) X 0.4206 ft3/ft X 3.5 (250% excess) = 1,805 ft' Top of Tail to Permafrost (1,945'- 1,3411 X 0.4206 ft3/ft X 1.5 (50% excess) =381W Total Volume = 81 + 1,805 + 381 = 2,267 ft' _> 1175sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Shoe Joint Tail slurry from 2,445' MD to 1,945' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,445'-1,9451 X 0.4206 ft3/ft X 1.50 (50% excess) = 316 ft' Shoe Joint (80) X 0.8407 ft3/ft X 1.0 (0% excess) = 68 ft3 Total Volume = 316 + 68 = 384 ft3 => 328sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 9-5/8" Intermediate liner run to 13.950' MD / 6,041' TVD Top of 12.2ppg Class G extended lead slurry is designed to be at 8,344' MD, which is 500' MD above the top of the Albian Sub 97. Assume 40% excess annular volume. Tack liner shoe with 500' MD of 15.8 ppg Class G tail slurry. Assume 40% excess annular volume. Lead slurry from 13,450; MD to 8,344' MD with 12.2 ppg Class G +additives Top of lead to Top of cement (13,450'-8,344) X 0.3132 ft3/ft X 1.4 (40% excess) = 2239 ft3 Total Volume = 2239 ft3 => 974Sx Class G + 3% D79,0.2% D46,0.35 gps D110 @ 12.2 ppg yielding 2.30 ft3/sk Tail slurry from 13,950' MD to 13,450' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (13,950'-13,450) X 0.3132 ft'/ft X 1.40 (40% excess) = 220 ft' Shoe Joint (801 X 0.4257 ft'/ft X 1.0 (0% excess) = 34 ft3 Total Volume = 220 + 34 = 254 ft' _> 217sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 8-3/4" Pilot Hole to 19.900' MD / 7.510' TVD - P&A Open Hole Section Cement from TD to >100' above the top of the Kuparuk C with Class G + Adds. @ 15.8 PPG as per 20 AAC 25.112 (a) (1) (B). Use 50% excess annular volume to account for washout. CRU CD5-316 Page 15 of 21 Printed., 20 -Mar --17 Applicatii r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Pump 17.0 ppg Class G cement up to kick-off point at 13,750' MD on top of a 500' long high-visc. gel pill. Use 50% excess annular volume to account for washout. Plug #1 (Isolation) from 19,900' MD to 19,300' with 15.8 ppg Class G + additives 8-3/4" Open Hole (19,900'— 19,300) X 0.4176 ft'/ft X 1.5 (50% excess) = 376ft' Total Volume = 376 ft' _> 324 sx of 15.8 ppg Class G @ 1.16 ft3 /sk (18,689'— 18,2481 X 0.2646 ft'/ft X 1.40 (40% excess) = 164 ft3 Plug #2 (Kick-off) from 14,350' MD to 13,750' MD with 17.0 ppg Class G + additives 8-3/4" Open Hole (14,350'— 13,950) X 0.4176 ft3/ft X 1.5 (50% excess) =251W 9-5/8" Casing (13,950'— 13,750) X 0.4257 ft3/ft X 1.5 (50% excess) =85W Total Volume = 251 + 85 = 336 ft3 => 336 sx of 17.0 ppg Class G + additives @ 1.00 ft3/sk 7" Intermediate liner run to 18.789' MD / 7439' TVD Top of slurry is designed to be at liner top at 18,248' MD, which will 500' MD Kuparuk C. Assume 40% excess annular volume. 9-7/8" underreamer to be 100ft behind the drill bit. Tail slurry from 18,789' MD to 18,248' MD with 15.8 ppg Class G + additives Shoe to top of 8-3/4" Hole (18,789'— 18,6891 X 0.1503 ft3/ft X 1.40 (40% excess) =21W 9-7/8" Hole to Top of Cement (18,689'— 18,2481 X 0.2646 ft'/ft X 1.40 (40% excess) = 164 ft3 Shoe Joint (80� X 0.2148 ft3/ft X 1.0 (0% excess) = 17 ft3 Total Volume = 21+ 164 + 17 = 202 ft3 => 173sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk CRU CD5-316 Page 16 of 21 Printed., 20 -Mar -17 Applicatii r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 16" Hole / 13-3/8" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Gas Hydrates Low If observed — control drill, reduce pump rates and Hole swabbing on trips Medium circulating time, reduce mud temperatures Clay Balling Medium Maintain planned mud parameters and flow rates, Increase mud weight, use weighted sweeps, Abnormal Pressure in Low reduce fluid viscosity, control ROP Abnormal Pressure in Low Diverter drills, increased mud weight. Shallow Surface Formations hazard stud noted minimal risk Lost Circulation Medium Reduce pump rates, mud rheology, add lost Abnormal Reservoir Low circulation material, use of low density cement Pressure slurries ort collar, control pipe running seeds 12-1/4" Hole / 9-5/8" Liner Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time hole ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, Lost circulation Low proper hole filling, pump out of hole, real time ECD monitoring Abnormal Pressure in Low Well control drills, check for flow during Overburden Formations Medium connections, increase mud weight. Shallow hazard study noted minimal risk Hole Cleaning Low Monitor ECD and torque/drag trends, control drill Abnormal Reservoir Low and use best hole cleaning radices 8-3/4" Pilot Hole - Casinq Interval Event Risk Level Mitigation Strategy Sloughing shale, Tight High Increase mud weight, control ROP, connection and hole trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure connections increase mud weight Hydrogen Sulfide gas Low 1-12S drills, detection systems, alarms, standard well control practces, mud scavengers CRU CD5-316 Page 17 of 21 Printed. 20 -Mar -17 Applicatit r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 8-3/4" x 9-7/8" Hole / 7" Liner - Casina Interval Event Risk Level Mitigation Strategy Sloughing shale, Tight High Increase mud weight, control ROP, connection and hole trip speeds, sweeps, and real time equivalent circulating density (ECD) monitoring, run casing as Hole swabbing on trips Medium liner Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation Abnormal Reservoir Low material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, Differential Sticking Low proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure connections increase mud weight Hydrogen Sulfide gas Low HzS drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole / 4-1/2" Pre -Perforated Liner - Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduce pump rates, reduce trip speeds, real time ECD monitoring, mud rheology, add lost circulation material Hole swabbing on trips Medium Reduce trip speeds, condition mud properties, proper hole filling, pump out of hole, real time ECD monitoring Abnormal Reservoir Low Well control drills, check for flow during Pressure connections increased mud weight Differential Sticking Low Uniform reservoir pressure along lateral, keep pipe movinq, control mud weight Hydrogen Sulfide gas Low HzS drills, detection systems, alarms standard well control practices, mud scavengers CRU CD5-316 Page 18 of 21 Printed: 20 -Mar --17 Applicati� : Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drillina Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach in the pilot and intermediate #2 hole sections will require higher mud weights than historically used to enhance wellbore stability. Managed Pressure Drilling will be used in conjunction with a 4 -string casing design to mitigate shale instability in the aforementioned formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks CRU CD5-316 Page 19 o/ 21 Printed: 20 -Mar -17 CD5-316wp03.1 Schematic A" H40 Welded Conductor 115' 13 -LB' 68# L40 Hyddl 463 x BTC -M 2,445' MD 12,105' TVD 56° ind22Y azi 16" Open Hole T' 269 L-60 Tie Back BTC -M 7" 260 L40 BTC -M Liner Top of liner@ 13,000' MD / 5,992' TVD Liner spoe ®10,789' MD 17.439 TVD 08° InNfl3' azi Applicatic Attachment 3 - Completion Schematic r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Upper Completion: Length 1) 4-%d' 12.6#/ft TXP 2) 3.813" X Nipple 3) 4-Yx" x 1" Camoo KBMG GLM (xx°) w/DCK2 7' pinned for 2500 psi casing to tbg shear 4) XN nipple 3.813" ID 1.5' 5) WLEG with seals 1.5' Lower Completion: 6) ZXP Liner Top Packer & Flexlock Liner Hanger 37' XO 5" Hydril 521 Box X 4-%" IBTM pin 7) XN nipple 3.735" ID 1.5' 8) 4 %d', 12.6#NN, L-80 IBT-M/SLHT Liner Pert pups and swell packers as necessary 9518" 40# L40 BTC4# Llner 13.950' MD/6,041' TVD 71°In. l Y.1 4-'/4" 12.6# L-80 H563 Tubing 4-%" 12.6# L-80 TXP Production Liner l \\ Top of liner X18,600' MD / 7,422' TVD \ \ Liner shoe Q27,800' MD \ \ 8-1/0" Open Hole \ \ 2],02d'MD VO /],521'T \ \ \\ O O O O O O O O I \ -------------------------------- CRU ___________________ ____ CRU CD5-316 Page 20 of 21 Printed: 20 -Mar -17 Applicati� r Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Attachment 4 — Area of Review (For Injectors) Note: This well will be used as a WAG injector. However, there are no wells within r/a mile of the downhole location and therefore no detailed AOR was completed. CRU CD5316 Page 21 of 21 Printed: 20 -Mar -17 Applicatic Permit to Drill, Well CRU CD5-316 Saved: 20 -Mar -17 Attachment 5 — Directional Plan CD5-316wp03.1 Objective: Planned WAG injection well to support offset Kuparuk C producers. CD5-316PB1wp07 Objective: Planned intermediate pilot hole to access Kuparuk C reservoir top, thickness and quality. CRU CD5-316 Page 22 of 21 Printed: 20 -Mar -17 CD5-3 Base PermalrOld a5 d i m I c 0 O 141 Ip ylll O 16P61wpO7 Kingak F Kup C, Alp C 5 Kalubik `I `y UJU t 5000 10000 15006, 20000 103/4" x 13-12 Measured Depth S 5/8"x f 2-1/6" - Geodetic Datum: 0 0 - Depth Reference: Plan: 34 2,36.3 @ 70.80ush (Doyon 19) Rig: Doyon 19 v, $ no m no 0 0 m $ 2000 4000 6000 8000 10000 12000 14000 16000 18000 SURVEY PROGRAM Surface Location spin From Depth To SurveylPlan To01 North /Y: 36.80 12W.00 CD5-316wp03.1 (Plan: C05 316) GYD-GC-SS Elevation: East /34.00 ad 1200.00 2445.83 CD5-316wpO3.1 (Plan'. CDS-316) MWD+IFR-AK-CAZ-SC Plan Summary V 2445.83 14000.00 CM-316wpD3.1 (Plan'. CD5-316) MWD+IFR-AK-CAZ-SC 180 26200 " M66 14000.00 15500.00 CD5-316PB1wpO7(Plan'. C05-316PB1) MWD CASING DETAILS MOO - 211 15500.00 21165.95 CD5-316PBtwp07(Plan'. GD5-316P8t}WD.I R-AK-CAZ-SC TVD MD Name FF ®" �rG ISA 116.30 116.30 20'x42" Magnetic Model: BOGMM16 T 2185.80 2445.83 10-3/4" x 13-10 Magnetic Model pale: 15 Apr -17 4, �e4v� it g 6041.7/.83 13950.26 95/8"x12 -1/d" Magnetic Declination: 17.21° 7438 18789.57 8-3/4" TownvMaMnetic Dire iontoaTme Orec4an.Add17.21°Fast {`�IFYApF 2445.83 14000.00 CM-316wpD3.1 (Plan'. CD5-316) MWD+IFR-AK-CAZ-SC 180 26200 " M66 14000.00 15500.00 CD5-316PB1wpO7(Plan'. C05-316PB1) MWD CASING DETAILS MOO - 211 15500.00 21165.95 CD5-316PBtwp07(Plan'. GD5-316P8t}WD.I R-AK-CAZ-SC TVD MD Name 116.30 116.30 20'x42" Magnetic Model: BOGMM16 T 2185.80 2445.83 10-3/4" x 13-10 Magnetic Model pale: 15 Apr -17 4, 6041.7/.83 13950.26 95/8"x12 -1/d" Magnetic Declination: 17.21° 7438 18789.57 8-3/4" TownvMaMnetic Dire iontoaTme Orec4an.Add17.21°Fast {`�IFYApF SECTION DETAILS Sac MD Inc All TVD +N/ -S +E/ -W Dleg TFace VSect Target Annotation 1 14000.00 70.70 224.59 6058.21 -8411.20 -8111.05 0.00 0.0011554.18 13208 2 15899.67 70.70 224.59 6686.18 -9688.01 -9369.68 0.00 0.0013323.95 Adjust TF to Oo, for 1899.6T 3 15929.67 71.74 223.96 6695.84 -9708.35 -9389.51 4.00 30.0013352.01 Start 4Y100' DIS, -30o TF, for 30 4 15949.67 71.74 223.96 6702.11 -9722.02 -9402.69 0.000.0013370.79 Hold for 20' 5 17186.23 79.78 186.51 7016.68 -10786.66 -9896.64 3.00 -82.7314524.82 Start 31`100' DLS, -82.73° TF, for 1236.56' 6 19643.04 79.78 186.51 7452.80 -13188.84 -10170.94 0.00 0.0016642.20 CD5-316PB1 O1.KuPC 041816 DK Hold for 2456.81' 7 21165.95 49.32 186.51 8099.65 -14539.02 -10325.11 2.00 180.0017832.30 TD: 21165.95' MD, 6099.65' TVD by: Checked by: V. Caere Accepted by: E. Stark Approved by: W. Earhart Base PINmafrost 1 6930.8 HRZg 3i mk LCU BSG Kingak F Spider View March 03 .4C wells ONLY (NOT a $eider) CD5-316PBlwp07 CD5-316wp03.1 CD5 A Easting (6000 usftlin) Easting (6000 usftlin) CD4 INanuq Plan View CD5-316PB1 wp07 Plan View - G 13000- 6500- 0— x 13-1/2! 300065000 x13-1/2' 3� Y 00 °y z = 0 -6500 x 00 XO P co 9 5/8" x 12-1/4" ��OO O D 3 iwp07 18 -13000 19000 grog 313 ,a�1 G 0 0 19500 D5 316wP03`1 CD5-315 - CD5-314XwP07 -26000 -19500 -13000 -6500 0 6500 13000 19500 26000 West( -)/East(+) (6500 usft/in) Section View CD5-316PB1wp07 Section View Vertical Section at 215.380 (2000 usft/in) 20" x 42" 00 10-3/4" x 13-1/2" A000 2000 N � 0 0 CD co 00 9 5/8" x 12-1/4" oN no 00 01 4000 0 o °j n o o Q o OQO� 3� ro o N 0 o 00 t' o �o o o G ` 000 6000- HRZ OD 0 00 - ------------- ------------- —— — — — — �� Kalubik-- --- ---- -- --- 8000-11. =-- LCLI — —— _— ___ Kup C Alp C uJu 10000 Kingak F CD5-316PB1 O1.KupC 041816 K 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Vertical Section at 215.380 (2000 usft/in) Plan Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316PB1 Plan: CD5-316PB1wp07 Report 03 March, 2017 Company: ConomPhillips(Alaska) Inc. -WNS Project Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-316 Wellbore: Plan: CD5-316PBl Design: CD5-316PBtwp07 Report Local Co-ordinate Reference: Well Plan: CD5-316 TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CDS Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° well Plan: CDS-316 From Well Position -NI-S 0.00 usft Northing: Latitude: Version: +E/ -W 0.00 usft Easting: Longitude: Position Uncertainty Depth From (TVD) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore Plan: CD5-316PB1 Magnetics Model Name Sample Date Declination Dip Angie Field Strength (°) (°) (nT) BGGM2016 4/15/2017 17.21 80.81 57,505 Design CD5-316PB1wp07 From Audit Notes: (usft) (usft) Survey (Wellbore) Version: Phase: PLAN Tie On Depth: 14,000.00 Vertical Section: Depth From (TVD) +WS +EI -W Direction 2,445.83 (usft) (usft) (usft) (°) 21,165.95 C05-316P81wo07(Plan: CD5-316PB1) 36.80 0,00 0.00 215.38 Survey Tool Program Date 3/3/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 36.80 1,200.00 CD5316wp03.1 (Plan: CD5-316) GYD-GC-SS Gyrodam gyro single shots 1,200.00 2,445.83 CD5-316wp03.1(Plan: CD5-316) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,445.83 14,000.00 CD5-316wp03.1(Plan:CD5-316) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 14,000.00 21,165.95 C05-316P81wo07(Plan: CD5-316PB1) MWD-IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Let Error (usft) (°) () (usft) (usft) ('/100usft) V) (usft) 36.80 0.00 0.00 36.80 -34.00 0.00 0.00 0.00 100.00 0.00 0.00 100.00 29.20 0.00 0.00 0.05 116.30 0.00 0.00 116.30 45.50 0.00 0.00 0.19 20" z 42" 200.00 0.00 0.00 200.00 129.20 0.00 0.00 0.19 300.00 0.00 0.00 300.00 229.20 0.00 0.00 0.34 400.00 0.00 0.00 400.00 329.20 0.00 0.00 0.48 500.00 1.50 200.00 499.99 429.19 1.50 200.00 0.56 600.09 3.00 200.00 600.00 529.20 1.50 0.00 0.61 31312 01 7 10:40:59AM Page 2 COMPASS 5000.1 Build 74 Report Company: ConowPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Planned Survey MD Inc Aid (azlmuth) TVD TVDSS DLeg TFace Lat. Error (usft) p) (°) (usft) (usft) (°1100usft) (°) (usft) 700.00 5.48 204.55 699.63 628.83 2.50 10.00 0.69 800.00 7.97 206.26 798.93 728.13 2.50 5.46 0.79 900.00 10.47 207.17 897.63 826.83 2.50 3.76 0.92 1,000.00 12.96 207.72 995.54 924.74 2.50 2.87 1.07 1,100.00 15.46 208.10 1,092.47 1,021.67 2.50 2.32 1.25 1,200.00 17.96 208.38 1,188.24 1,117.44 2.50 1.95 1.45 1,287.35 20.14 208.57 1,270.80 1,200.00 2.50 1.69 1.54 1,300.00 20.14 208.57 1,282.68 1,211.88 0.00 0.00 1.54 1,393.86 20.14 208.57 1,370.80 1,300.00 0.00 0.00 1.58 1,400.00 20.35 208.77 1,376.56 1,305.76 3.50 19.44 1.58 1,500.00 23.68 211.64 1,469.26 1,398.46 3.50 19.25 1.66 1,600.00 27.05 213.84 1,559.61 1,488.81 3.50 16.58 1.79 1,700.00 30.45 215.58 1,647.27 1,576.47 3.50 14.60 1.97 1,800.00 33.87 217.00 1,731.92 1,661.12 3.50 13.07 2.20 1,900.00 37.30 218.19 1,813.24 1,742.44 3.50 11.87 2.49 2,000.00 40.74 219.20 1,890.92 1,820.12 3.50 10.90 2.81 2,100.00 44.19 220.08 1,964.68 1,893.88 3.50 10.12 3.18 2,200.00 47.64 220.86 2,034.24 1,963.44 3.50 9.46 3.59 2,300.00 51.10 221.56 2,099.35 2,028.55 3.50 8.92 4.02 2,400.00 54.57 222.19 2,159.75 2,088.95 3.50 B.47 4.49 2,445.83 56.15 222.46 2,185.80 2,115.00 3.50 8.09 4.63 10-3/4" x 13-112" 2,465.83 56.15 222.46 2,196.94 2,126.14 0.00 0.00 4.66 2,500.00 57.34 222.66 2,215.67 2,144.87 3.50 7.96 4.72 2,600.00 60.81 223.21 2,267.06 2,196.26 3.50 7.85 4.92 2,700.00 64.28 223.72 2,313.16 2,242.36 3.50 7.57 5.18 2,800.00 67.75 224.20 2,353.81 2,283.01 3.50 7.33 5.49 2,884.83 70.70 224.59 2,383.89 2,313.09 3.50 7.13 5.79 2,900.00 70.70 224.59 2,388.91 2,318.11 0.00 0.00 5.85 3,000.00 70.70 224.59 2,421.97 2,351.17 0.00 0.00 6.23 3,100.00 70.70 224.59 2,455.02 2,384.22 0.00 0.00 6.64 3,200.00 70.70 224.59 2,488.08 2,417.28 0.00 0.00 7.07 3,300.00 70.70 224.59 2,521.14 2,450.34 0.00 0.00 7.51 3,400.00 70.70 224.59 2,554.19 2,483.39 0.00 0.00 7.97 3,500.00 70.70 224.59 2,587.25 2,516.45 0.00 0.00 8.44 3,600.00 70.70 224.59 2,620.31 2,549.51 0.00 0.00 8.93 3,700.00 70.70 224.59 2,653.36 2,582.56 0.00 0.00 9.42 3,800.00 70.70 224.59 2,686.42 2,615.62 0.00 0.00 9.91 3,900.00 70.70 224.59 2,719.48 2,648.68 0.00 0.00 10.42 4,000.00 70.70 224.59 2,752.53 2,681.73 0.00 0.00 10.93 4,100.00 70.70 224.59 2,785.59 2,714.79 0.00 0.00 11.44 4,200.00 70.70 224.59 2,818.65 2,747.85 0.00 0.00 11.96 4,300.00 70.70 224.59 2,851.70 2,780.90 0.00 0.00 12.48 4,400.00 70.70 224.59 2,884.76 2,813.96 0.00 0.00 13.01 3/3/2017 f 0:40:59AM Page 3 COMPASS 5000.1 Build 74 Report Company: ConowPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-316 Protect Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: C05-316PBI Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Lat. Error Wall) V) (1 (usft) (usft) (°/100usit) (°) (usft) 4,500.00 70.70 224.59 2,917.82 2,847.02 000 0.00 13.54 4,600.00 70.70 224.59 2,950.87 2,880.07 0.00 0.00 14.07 4,700.00 70.70 224.59 2,963.93 2,913.13 0.00 0.00 14.60 4,800.00 70.70 224.59 3,016.99 2,946.19 0.00 0.00 15.13 4,900.00 70.70 224.59 3,050.04 2,979.24 0.00 0.00 15.67 5,000.00 70.70 224.59 3,083.10 3,012.30 0.00 0.00 16.21 5,100.00 70.70 224.59 3,116.16 3,045.36 0.00 0.00 16.75 5,200.00 70.70 224.59 3,149.21 3,078.41 0.00 0.00 17.29 5,300.00 70.70 224.59 3,182.27 3,111.47 0.00 0.00 17.83 5,400.00 70.70 224.59 3,215.33 3,144.53 0.00 0.00 18.37 5,500.00 70.70 224.59 3,248.39 3,177.59 0.00 0.00 18.92 5,600.00 70.70 224.59 3,281.44 3,210.64 0.00 0.00 19.46 5,700.00 70.70 224.59 3,314.50 3,243.70 0.00 0.00 20.01 5,800.00 70.70 224.59 3,347.56 3,276.76 0.00 0.00 20.55 5,900.00 70.70 224.59 3,380.61 3,309.81 0.00 0.00 21.10 6,000.00 70.70 224.59 3,413.67 3,342.87 0.00 0.00 21.65 6,100.00 70.70 224.59 3,446.73 3,375.93 0.00 0.00 22.19 6,200.00 70.70 224.59 3,479.78 3,408.98 0.00 0.00 22.74 6,300.00 70.70 224.59 3,512.84 3,442.04 0.00 0.00 23.29 6,400.00 70.70 224.59 3,545.90 3,475.10 0.00 0.00 23.84 6,500.00 70.70 224.59 3,578.95 3,508.15 0.00 0.00 24.39 6,600.00 70.70 224.59 3,612.01 3,541.21 0.00 0.00 24.94 6,700.00 70.70 224.59 3,645.07 3,574.27 0.00 0.00 25.49 6,800.00 70.70 224.59 3,678.12 3,607.32 0.00 0.00 26.05 6,900.00 70.70 224.59 3,711.18 3,640.38 0.00 0.00 26.60 7,000.00 70.70 224.59 3,744.24 3,673.44 0.00 0.00 27.15 7,100.00 70.70 224.59 3,777.29 3,706.49 0.00 0.00 27.70 7,200.00 70.70 224.59 3,810.35 3,739.55 0.00 0.00 28.25 7,300.00 70.70 224.59 3,843.41 3,772.61 0.00 0.00 28.81 7,400.00 70.70 224.59 3,876.46 3,805.66 0.00 0.00 29.36 7,500.00 70.70 224.59 3,9139.52 3,838.72 0.00 0.00 29.91 7,600.00 70.70 224.59 3,942.58 3,871.78 0.00 0.00 30.47 7,700.00 70.70 224.59 3,975.63 3,904.83 0.00 0.00 31.02 7,800.00 70.70 224.59 4,008.69 3,937.89 0.00 0.00 31.57 7,900.00 70.70 224.59 4,041.75 3,970.95 0.00 0.00 32.13 8,000.00 70.70 224.59 4,074.80 4,004.00 0.00 0.00 32.68 8,100.00 70.70 224.59 4,107.86 4,037.06 0.00 0.00 33.24 8,200.00 70.70 224.59 4,140.92 4,070.12 0.00 0.00 33.79 8,300.00 70.70 224.59 4,173.97 4,103.17 0.00 0.00 34.35 8,400.00 70.70 224.59 4,207.03 4,136.23 0.00 0.00 34.90 8,500.00 70.70 224.59 4,240.09 4,169.29 0.00 0.00 35.46 8,600.00 70.70 224.59 4,273.14 4,202.34 0.00 0.00 36.01 8,700.00 70.70 224.59 4,306.20 4,235.40 0.00 0.00 36.57 8,800.00 70.70 224.59 4,339.26 4,268.46 0.00 0.00 37.12 3/32017 f 0:40:59AM Page 4 COMPASS 5000.1 Build 74 Report Company: ConomPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CDS-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: CD5-316PB1 Survey Calculation Method; Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Planned Survey MD Inc Azl(azimuth) TVD TVDSS DLeg TFace Lat. Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 8,900.00 70.70 224.59 4,372.32 4,301.52 0.00 0.00 37.66 9,000.00 70.70 224.59 4,405.37 4,334.57 0.00 0.00 38.24 9,100.00 70.70 224.59 4,438.43 4,367.63 0.00 0.00 38.79 9,200.00 70.70 224.59 4,471.49 4,400.69 0.00 0.00 39.35 9,300.00 70.70 224.59 4,504.54 4,433.74 0.00 0.00 39.90 9,400.00 70.70 224.59 4,537.60 4,466.80 0.00 0.00 40.46 9,500.00 70.70 224.59 4,570.66 4,499.86 0.00 0.00 41.02 9,600.00 70.70 224.59 4,603.71 4,532.91 0.00 0.00 41.57 9,700.00 70.70 224.59 4,636.77 4,565.97 0.00 0.00 42.13 9,800.00 70.70 224.59 4,669.83 4,599.03 0.00 0.00 42.69 9,900.00 70.70 224.59 4,702.88 4,632.08 0.00 0.00 43.24 10,000.00 70.70 224.59 4,735.94 4,665.14 0.00 0.00 43.80 10,100.00 70.70 224.59 4,769.00 4,698.20 0.00 0.00 44.36 10,200.00 70.70 224.59 4,802.05 4,731.25 0.00 0.00 44.91 10,300.00 70.70 224.59 4,835.11 4,764.31 0.00 0.00 45.47 10,400.00 70.70 224.59 4,868.17 4,797.37 0.00 0.00 46.03 10,500.00 70.70 224.59 4,901.22 4,830.42 0.00 0.00 46.58 10,600.00 70.70 224.59 4,934.28 4,863.48 0.00 0.00 47.14 10,700.00 70.70 224.59 4,967.34 4,896.54 0.00 0.00 47.70 10,800.00 70.70 224.59 5,000.39 4,929.59 0.00 0.00 48.26 10,900.00 70.70 224.59 5,033.45 4,962.65 0.00 0.00 48.81 11,000.00 70.70 224.59 5,066.51 4,995.71 0.00 0.00 49.37 11,100.00 70.70 224.59 5,099.56 5,028.76 0.00 0.00 49.93 11,200.00 70.70 224.59 5,132.62 5,061.82 0.00 0.00 50.49 11,300.00 70.70 224.59 5,165.68 5,094.88 0.00 0.00 51.04 11,400.00 70.70 224.59 5,198.73 5,127.93 0.00 0.00 51.60 11,500.00 70.70 224.59 5,231.79 5,160.99 0.00 0.00 52.16 11,600.00 70.70 224.59 5,264.85 5,194.05 0.00 0.00 52.72 11,700.00 70.70 224.59 5,297.90 5,227.10 0.00 0.00 53.27 11,800.00 70.70 224.59 5,330.96 5,260.16 0.00 0.00 53.83 11,900.00 70.70 224.59 5,364.02 5,293.22 0.00 0.00 54.39 12,000.00 70.70 224.59 5,397.08 5,326.28 0.00 0.00 54.95 12,100.00 70.70 224.59 5,430.13 5,359.33 0.00 0.00 55.50 12,200.00 70.70 224.59 5,463.19 5,392.39 0.00 0.00 56.06 12,300.00 70.70 224.59 5,496.25 5,425.45 0.00 0.00 56.62 12,400.00 70.70 224.59 5,529.30 5,458.50 0.00 0.00 57.18 12,500.00 70.70 224.59 5,562.36 5,491.56 0.00 0.00 57.74 12,600.00 70.70 224.59 5,595.42 5,524.62 0.00 0.00 58.29 12,700.00 70.70 224.59 5,628.47 5,557.67 0.00 0.00 58.85 12,800.00 70.70 224.59 5,661.53 5,590.73 0.00 0.00 59.41 12,900.00 70.70 224.59 5,694.59 5,623.79 0.00 0.00 59.97 13,000.00 70.70 224.59 5,727.64 5,656.84 0.00 0.00 60.53 13,100.00 70.70 224.59 5,760.70 5,689.90 0.00 0.00 61.08 13,200.00 70.70 224.59 5,793.76 5,722.96 0.00 0.00 6164 13,300.00 70.70 224.59 5,826.81 5,756.01 0.00 0.00 62.20 3/3r`2017 10:40:59AM Page 5 COMPASS 5000.1 Build 74 Report Company: ConowPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: Plan: CD5-316 North Reference: Wellbore: Plan: CD5316PB1 Survey Calculation Method: Design: CD5-316PB1wp07 Database: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usR (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Lat. Error (usft) (') (1) (usft) (usft) ('1100usft) V) lush) 13,400.00 70.70 224.59 5.859.87 5,789.07 0.00 0.00 62.76 13,500.00 70.70 224.59 5,892.93 5,822.13 0.00 0.00 63.32 13,600.00 70.70 224.59 5,925.98 5,855.18 0.00 0.00 63.88 13,700.00 70.70 224.59 5,959.04 5,888.24 0.00 0.00 64.43 13,800.00 70.70 224.59 5,992.10 5,921.30 0.00 0.00 64.99 13,900.00 70.70 224.59 6,025.15 5,954.35 0.00 0.00 65.55 13,950.25 70.70 224.59 6,041.77 5,970.97 0.00 0.00 66.11 9 5/8" x 12-1/4" 14,000.00 70.70 224.59 6,058.21 5,987.41 0.00 0.00 66.11 14,100.00 70.70 224.59 6,091.27 6,020.47 0.00 0.00 66.48 14,200.00 70.70 224.59 6,124.32 6,053.52 0.00 0.00 66.67 14,300.00 70.70 224.59 6,157.38 6,086.58 0.00 0.00 66.86 14,400.00 70.70 224.59 6,190.44 6,119.64 0.00 0.00 67.06 14,500.00 70.70 224.59 6,223.49 6,152.69 0.00 0.00 67.26 14,600.00 70.70 224.59 6,256.55 6,185.75 0.00 0.00 67.47 14,700.00 70.70 224.59 6,289.61 6,218.81 0.00 0.00 67.67 14,800.00 70.70 224.59 6,322.66 6,251.86 0.00 0.00 67.69 14,900.00 70.70 224.59 6,355.72 6,284.92 0.00 0.00 68.10 15,000.00 70.70 224.59 6,388.78 6,317.98 0.00 0.00 68.33 15,100.00 70.70 224.59 6,421.83 6,351.03 0.00 0.00 68.55 15,200.00 70.70 224.59 6,454.89 6,384.09 0.00 0.00 68.78 15,300.00 70.70 224.59 6,487.95 6,417.15 0.00 0.00 69.01 15,400.00 70.70 224.59 6,521.01 6,450.21 0.00 0.00 69.25 15,500.00 70.70 224.59 6,554.06 6,483.26 0.00 0.00 69.49 15,600.00 70.70 224.59 6,587.12 6,516.32 0.00 0.00 69.73 15,700.00 70.70 224.59 6,620.18 6,549.38 0.00 0.00 69.98 15,800.00 70.70 224.59 6,653.23 6,582.43 0.00 0.00 70.23 15,899.67 70.70 224.59 6,686.18 6,615.38 0.00 0.00 70.48 15,900.00 70.71 224.58 6,686.29 6,615.49 4.00 -30.00 70.48 KOP: 4°1100' DLS, 30' TF, for 30' 15,929.67 71.74 223.96 6,695.84 6,625.04 4.00 -30.00 70.56 15,930.00 71.74 223.96 6,695.94 6,625.14 0.00 0.00 70.56 Hold for 20' 15,949.67 71.74 223.96 6,702.11 6,631.31 0.00 0.00 70.61 15,950.00 71.74 223.95 6,702.21 6,631.41 3.00 -82.73 70.61 Start 3'/100' DLS, 32.73' TF, for 1236.44' 16,000.00 71.93 222.38 6,717.80 6,647.00 3.00 -62.73 70.70 16,100.00 72.36 219.26 6,748.46 6,677.66 3.00 -82.24 70.70 16,200.00 72.84 216.16 6,778.36 6,707.56 3.00 -81.29 70.51 16,300.00 73.37 213.07 6,807.43 6,736.63 3.00 -80.36 70.11 16,400.00 73.94 210.00 6,835.58 6,764.78 3.00 -79.46 69.53 16,500.00 74.55 206.95 6,862.73 6,791.93 3.00 -78.60 68.76 16,600.00 75.21 203.92 6,888.82 6,818.02 3.00 -77.77 67.80 16,700.00 75.91 200.91 6,913.77 6,842.97 3.00 -76.98 66.68 3/3201710:40:59AM Page 6 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Protect: Western North Slope Site: CDS Alpine West Pad Well: Plan: CD5316 Wellbore: Plan: CO5-316PB1 Design: CD5-316PB1wp07 Planned Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Database: MD Inc Azl(nimuth) TVD (usft) 1°I 1°) (usft) 16,771.22 76.42 198.77 6,930.80 HRZ 3.00 -7572 65.38 16,800.00 76.64 197.91 6,937.50 16,900.00 77.41 194.93 6,959.97 17,000.00 78.21 191.98 6,981.09 17,100.00 79.04 189.04 7,000.83 17,186.23 79.78 186.51 7,016.68 17,186.44 79.78 186.51 7,016.72 Hold for 2456.97' 0.00 0.00 61.95 17,200.00 79.78 186.51 7,019.13 17,300.00 79.78 186.51 7,036.88 17,400.00 79.78 186.51 7,054.63 17,500.00 79.78 186.51 7,072.38 17,600.00 79.78 186.51 7,090.13 17,700.00 79.78 186.51 7,107.88 17,800.00 79.78 186.51 7,125.64 17,900.00 79.78 186.51 7,143.39 18,000.00 79.78 186.51 7,161.14 18,100.00 79.78 186.51 7,178.89 18,200.00 79.78 186.51 7,196.64 18,300.00 79.78 186.51 7,214.39 18,400.00 79.78 186.51 7,232.14 18,500.00 79.78 186.51 7,249.89 18,600.00 79.78 186.51 7,267.65 18,700.00 79.78 186.51 7,285.40 18,800.00 79.78 186.51 7,303.15 18,900.00 79.78 186.51 7,320.90 18,995.20 79.78 186.51 7,337.80 Kalubik 19,000.00 79.78 186.51 7,338.65 19,100.00 79.78 186.51 7,356.40 19,200.00 79.78 186.51 7,374.15 19,300.00 79.78 186.51 7,391.91 19,400.00 79.78 186.51 7,409.66 19,500.00 79.78 186.51 7,427.41 19,600.00 79.78 186.51 7,445.16 19,624.58 79.78 186.51 7,449.52 CD5.314x KupC 020816 DK 19,643.04 79.78 186.51 7,452.80 Kup C - CD5316PB7 01.KupC 041316 NA - CD5316PS1 01.KupC 041816 DK 19,643.40 79.77 186.51 7,452.86 Start 2°1100' DLS, 180° TF, for 1422.91' 19,686.30 78.91 186.51 7,460.80 LCU 19,700.00 78.64 186.51 7,463.47 Well Plan: C135-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 TVDSS Oleg TFace Let Error (usft) (°/100usft) (°) (usft) 6.860.00 3.00 -76.23 65.38 6,866.70 3.00 -7572 65.38 6,889.17 3.00 -75.51 63.93 6,910.29 3.00 -74.85 62.33 6,930.03 3.00 -74.22 60.58 6,945.88 3.00 -73.64 58.961 6,945.92 0.00 0.00 58.96 6,948.33 0.00 0.00 59.00 6,966.08 0.00 0.00 59.28 6,983.83 0.00 0.00 59.56 7,001.58 0.00 0.00 59.84 7,019.33 0.00 0.00 60.13 7,037.08 0.00 0.00 60.42 7,054.84 0.00 0.00 60.72 7,072.59 0.00 0.00 61.02 7,090.34 0.00 0.00 61.33 7,108.09 0.00 0.00 61.64 7,125.84 0.00 0.00 61.95 7,143.59 0.00 0.00 62.26 7,161.34 0.00 0.00 62.58 7,179.09 0.00 0.00 62.91 7,196.85 0.00 0.00 63.23 7,214.60 0.00 0.00 63.56 7,232.35 0.00 0.00 63.90 7,250.10 0.00 0.00 64.23 7,267.00 0.00 0.00 64.57 7,267.85 0.00 0.00 64.57 7,285.60 0.00 0.00 64.92 7,303.35 0.00 0.00 65.26 7,321.11 0.00 0.00 65.61 7,338.86 0.00 0.00 65.97 7,356.61 0.00 0.00 66.32 7,374.36 0.00 0.00 66.68 7,378.72 0.00 0.00 66.84 7,382.00 0.00 0.00 66.84 7,382.06 2.00 180.00 66.84 1 7,390.00 2.00 -180.00 66.97 7,392.67 2.00 -180.00 66.971 3/3/2017 10.40 59AM Page 7 COMPASS 5000.1 Build 74 Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CD5-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: C05 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: Two Wellbore: Plan: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Planned Survey MD Inc Azi (azimuth) TVD TVDSS DLeg TFace Lab Error (usft) (usft) (usft) (°7100usfl) C) (usft) 19,800.00 76.64 186.51 7,484.88 7,414.08 200 -180.00 6709 19,900.00 74.64 186.51 7,509.69 7,438.89 2.00 -180.00 67.21 20,000.00 72.64 186.51 7,537.86 7,467.06 2.00 -180.00 67.34 20,100.00 70.64 186.51 7,569.36 7,498.56 2.00 -180.00 67.47 20,200.00 68.64 186.51 7,604.16 7,533.36 2.00 -180.00 67.60 20,300.00 66.64 186.51 7,642.21 7,571.41 2.00 -180.00 67.73 20,400.00 64.64 186.51 7,683.46 7,612.66 2.00 -180.00 67.87 20,500.00 62.64 186.51 7,727.87 7,657.07 2.00 -180.00 68.00 20,600.00 60.64 186.51 7,775.37 7,704.57 2.00 -180.00 68.14 20,700.00 58.64 186.51 7,825.92 7,755.12 2.00 -180.00 68.28 20,800.00 56.64 186.51 7,879.44 7,808.64 2.00 -180.00 68.42 20,900.00 54.64 186.51 7,935.89 7,865.09 2.00 -180.00 68.55 20,942.60 53.78 186.51 7,960.80 7,890.00 2.00 -180.00 68.69 Alp C 20,959.46 53.45 186.51 7,970.80 7,900.00 2.00 -180.00 68.69 UJU 21,000.00 52.64 186.51 7,995.18 7,924.38 2.00 -180.00 68.69 21,065.95 51.32 186.51 8,035.80 7,965.00 2.00 -180.00 68.83 Kingak F 21,066.32 51.31 186.51 8,036.03 7,965.23 2.00 -180.00 68.83 Adjust TF to 180°, for 100' 21,100.00 50.64 186.51 8,057.24 7,986.44 2.00 -180.00 68.83 21,165.95 49.32 186.51 8,099.65 8,028.85 2.00 -180.00 68.92 CDS-316PB1 IS 012617 DK 3/32017 10:40.59AM Page 8 COMPASS 5000.1 Build 74 Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Coordinate Reference: Well Plan: CD5-316 Project: Vkstem North Slope TVD Reference: Plan: 34.2+36.3 a 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Pian: CD5-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Plan Annotations Measured Depth (usft) 15,900.00 15,930.00 15,950.00 17,186.44 19,643.40 21,066.32 21,166.32 Vertical Depth (usft) 6,686.29 6,695.94 6,702.21 7,016.72 7,452.86 8,036.03 Local Coordinates +NIS +BI -W (usft) (usft) -9,688.24 -9,369.90 -9,708.58 -9,389.73 -9,722.25 -9,402.91 -10,786.86 -9,896.67 -13,189.20 -10,170.98 -14,462.84 -10,316.41 Comment KOP: 4/100' DLS, -30" TF, for 30' Hold for 20' Start 3°/100' DLS, -82.73° TF, for 1236.44' Hold for 2456.97' Start 2°/100' DLS, 180° TF, for 1422.91' Adjust TF to 180°, for 100' TD: 21166.32' MD, 8099.65' TVD Checked By: Approved By: Date: 3WO17 10:40:59AM Page 9 COMPASS 5000.1 Build 74 AC Summary ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316PB1 50103xxxxx00 CD5-316PB1wp07 L ailed Anti•Collisi e -0 Clearance Summary Anticollision Report 03 March, 2017 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan: CD5-316-Plan: CD5-316PB7-CD5-316PBlwp07 Well Coordinates: 5,965,580.48 N, 1,489,283.58 E (70° 18' 48.30" N, 151° 13' 29.76" W) Datum Height: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Scan Range: 0.00 to 21,166.73 usft. Measured Depth. Scan Radius is 2,312.99 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build; 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 4nticollision Report for Plan: CD5-316 - CD5-316PB1wp07 ray. Cylinder North Proximity Scan on Current Survey Data (North Reference) 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance reference Design: COS Alpine West Pad - Plan: CDS-316 - Plan; CDS316PB1 - CD5316PB1wp07 CD5-06 - CD5-0611 - CD5-061-1 399.94 199.29 399.94 192.40 400.00 ;can Range; 0.00 to 21,166.73 usft. Measured Depth. Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 49.83 180.20 49.83 177.44 50.00 ocan Radius is 2,312.99 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Pass - Major Risk CD5-07 - CD5-07 - CD5-07 472.68 182.51 472.68 174.32 Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on 424.70 Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name -Wellbore Name - Design (usft) (usft) (usft) (usft) usft 49.91 140.16 49.91 CD5 Alpine West Pad 50.00 50.704 Centre Distance Pass - Major Risk CD5-09 - CD5-09 - CD5-09 448.53 141.73 448.53 CD5-04 - CD5-04 - CD5-04 423.77 239.03 423.77 231.72 425.00 32.721 Centre Distance Pass - Major Risk CD5-04 - CD5-04 - CD5-04 471.96 239.32 471.96 231.33 475.00 29.926 Clearance Factor Pass - Major Risk CD5-05 - CD5-05 - CD5-05 274.80 219.82 274.80 214.85 275.00 44.253 Centre Distance Pass - Major Risk CD5-05 - CD5-05 - CD5-05 448.09 221.01 448.09 213.17 450.00 28.183 Clearance Factor Pass - Major Risk CDS-06 - CD5-06 - CD5-06 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance Pass - Major Risk CD5-06 - CD5-06 - CD5-06 399.94 199.29 399.94 192.40 400.00 28.923 Clearance Factor Pass - Major Risk CD5-06 - CD5-061-1 - CD5-061-1 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance Pass - Major Risk CD5-06 - CD5-0611 - CD5-061-1 399.94 199.29 399.94 192.40 400.00 28.923 Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 49.83 180.20 49.83 177.44 50.00 65.212 Centre Distance Pass - Major Risk CD5-07 - CD5-07 - CD5-07 472.68 182.51 472.68 174.32 475.00 22.289 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 424.70 158.84 424.70 151.54 425.00 21.741 Centre Distance Pass - Major Risk CD5-08 - CD5-08 - CD5-08 497.84 159.34 497.84 151.01 500.00 19.137 Clearance Factor Pass - Major Risk CD5-09 - CD5-09 - CD5-09 49.91 140.16 49.91 137.39 50.00 50.704 Centre Distance Pass - Major Risk CD5-09 - CD5-09 - CD5-09 448.53 141.73 448.53 133.88 450.00 18.048 Clearance Factor Pass - Major Risk CD5-10 - CD5-10 - CD5-10 424.63 120.03 424.63 112.86 425.00 16.742 Centre Distance Pass - Major Risk CD5-10 - CD5-10 - CD5-10 547.27 120.77 547.27 111.81 550.00 13.480 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 275.20 99.65 275.20 94.80 275.00 20.527 Centre Distance Pass - Major Risk CD5-11 - CD5-11 - CD5-11 474.05 100.61 474.05 92.55 475.00 12.484 Clearance Factor Pass - Major Risk CD5-12 - CD5-12 - CD5-12 250.59 79.56 250.59 75.10 250.00 17.624 Centre Distance Pass - Major Risk CD5-12 - CDB -12 - CD5-12 474.68 80.30 474.68 72.20 475.00 9.913 Clearance Factor Pass - Major Risk CD5-18 - CD5-18 - CD5-18 224.97 38.85 224.97 34.83 225.00 9.669 Centre Distance Pass - Major Risk CD5-18 - CD5-18 - CD5-18 299.82 39.36 299.82 34.08 300.00 7.445 Clearance Factor Pass - Major Risk CD5-18 - CD5-181-1 - CD5-181-1 224.97 38.85 224.97 34.83 225.00 9.669 Centre Distance Pass - Major Risk CD5-18 - CD5-181-1 - CD5-181-1 299.82 39.36 299.82 34.08 300.00 7.445 Clearance Factor Pass - Major Risk CD5-21 - CD5-21 - CD5-21 890.28 87.89 890.28 74.13 875.00 6.390 Clearance Factor Pass - Major Risk CD5-313 - CD5-313 - CD5-313 325.10 59.93 325.10 54.52 325.00 11.078 Centre Distance Pass - Major Risk CD5-313 - CD5-313 - CD5-313 647.31 61.27 647.31 50.95 649.95 5.938 Clearance Factor Pass - Major Risk CD5-313 - CD5-313PB1 - CD5-313PB1 325.10 59.93 325.10 54.52 325.00 11.076 Centre Distance Pass - Major Risk 03 March, 2017 - 10:40 Page 2 of 6 COMPASS Anticollision Report for Plan: CD5-316 - CD5-316PB1wpO7 'ray. Cylinder North Proximity Scan on Current Survey Data (North Reference) teference Design: CD6 Alpine West Pad - Plan: CDS-316 - Plan: CDS316PB1 - CD5316PB1wp07 ;can Range: 0.00 to 21,166.73 usft. Measured Depth. ;can Radius is 2,312.99 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited 03 March, 2017 - 10.:40 Page 3 of 6 COMPASS Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD5-313 - CD5-313PB1 - CD5-313PB1 647.31 61.27 647.31 50.95 649.95 5.938 Clearance Factor Pass - Major Risk CD5-314 - CD5-314 - CD5-314 424.76 39.83 424.76 32.50 425.00 5.435 Centre Distance Pass - Major Risk CD5-314 - CD5-314 - CD5-314 672.95 40.71 672.95 30.19 675.00 3.868 Clearance Factor Pass - Major Risk CD5-315 - CD5-315 - CD5-315 49.82 20.33 49.82 17.56 50.00 7.357 Centre Distance Pass - Major Risk _. CD5-315 - CD5-315 - C05-315 673.48 21.55 673.48 10.68 675.00 1.982 Clearance Factor Pass - Major Risk CD5-315 - C05-315PB1 - CD5-315PB1 49.82 20.33 49.82 17.56 50.00 7.357 Centre Distance Pass - Major Risk CD5-315 - CD5-315PB1 - CD5-315PB1 673.48 21.55 673.48 10.68 675.00 1.982 Clearance Factor Pass - Major Risk Plan: CD5-17 - Plan: CD5-17 - CD5-17wp09 650.75 16.48 650.75 5.48 650.00 1.498 Centre Distance Pass - Major Risk Plan: CD5-17 - Plan: CD5-17 - CD5-17wp09 675.57 16.77 675.57 5.38 675.00 1.472 Clearance Factor Pass - Major Risk Plan: CD5-17 - Plan: CD5-171-1 - CD5-17L1wp09 650.75 16.48 650.75 5.48 650.00 1.498 Centre Distance Pass - Major Risk Plan: CD5-17 - Plan: CD5-17L1 - CD5-17L1wp09 675.57 16.77 675.57 5.38 675.00 1.472 Clearance Factor Pass - Major Risk Plan: CD5-19 - Plan: CD5-19 - CD5-19wp08 (8D) 1,102.74 33.07 1,102.74 15.66 1,100.00 1.899 Centre Distance Pass - Major Risk Plan: CD5-19 - Plan: CD5-19-CD5-19wp08(8D) 1,127.24 33.39 1,127.24 15.62 1,125.00 1.879 Clearance Factor Pass - Major Risk Plan: CD5-19 - Plan: CD5-191-1-CD5-19L1wp08(8D) 1,102.74 33.07 1,102.74 15.66 1,100.00 1.899 Centre Distance Pass - Major Risk Plan: CD5-19 - Plan: CD5-191-1-CD5-19L1wp08(8D) 1,127.24 33.39 1,127.24 15.62 1,125.00 1.879 Clearance Factor Pass - Major Risk Plan: CD5-22 - Plan: CD5-22 - CD5-22wp02 (9A) 781.44 114.71 781.44 101.61 775.00 8.759 Centre Distance Pass - Major Risk Plan: CD5-22 - Plan: CD5-22 - CD5-22wp02 (9A) 806.22 114.87 806.22 101.36 800.00 8.501 Clearance Factor Pass - Major Risk Plan: CD5-23 - Plan: CD5-23-CD5-23wp01(9C) 1,707.06 39.71 1,707.06 13.76 1,675.00 1.530 Clearance Factor Pass - Major Risk Plan: CD5-314X - Plan: CD5-314X - CD5-314Xwp07 525.04 34.54 525.04 25.86 525.00 3.977 Centre Distance Pass - Major Risk Plan: CD5-314X - Plan: CDB -314X - CD5-314Xwp07 723.42 35.85 723.42 24.33 725.00 3.110 Clearance Factor Pass - Major Risk Plan: CD5-316 - Plan: CDS-316 - CD5-316wp03.1 - Plan: CD5-316 - Plan: CD5-316 - CD5-316wp03.1 - Rig: CD5-20 - Rig: CD5-20 - Rig: CD5-20 50.52 79.84 50.52 77.46 50.00 33.458 Centre Distance Pass - Major Risk Rig: CD5-20 - Rig: CD5-20 - Rig: CD5-20 652.57 83.35 652.57 72.41 650.00 7.613 Clearance Factor Pass - Major Risk Rig: CD5-20 - Rig: CD5-201-1 - Rig: CD5-201-1 50.52 79.84 50.52 77.46 50.00 33.458 Centre Distance Pass - Major Risk Rig: CD5-20 - Rig: CD5-201-1 - Rig: CD5-20L1 652.57 83.35 652.57 72.41 650.00 7.613 Clearance Factor Pass - Major Risk 03 March, 2017 - 10.:40 Page 3 of 6 COMPASS 4nticollision Report for Plan: CD5-316 - CD5-316Pl31wp07 Survey too/ program From To (usft) (usft) 36.80 1,200.00 1,200.00 2,445.83 2,445.83 14,000.00 14,000.00 21,165.95 CD5-316PB1wp07 :Ilipse error terms are correlated across survey tool tie -on points. :alculated ellipses incorporate surface errors. separation is the actual distance between ellipsoids. )istance Between centres is the straight line distance between wellbore centres. :learance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). dl station coordinates were calculated using the Minimum Curvature method. Survey/Plan Survey Tool GYD-GCSS MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC 03 March, 2017 - 10:40 Page 4 of 6 COMPASS Ladder View Ladder View 13:31. I rch a' 291 CD5-3 1 6 P B 1 w p07 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. < 9 v U o U 300 c p co o - N � II U1 150 1 p U o _. c m U EquFMant Ma9retic 0@hns 0 0 3000 6000 9000 12000 15000 18000 21000 Displayed interval could be less than entire well:Measured Dept114000.00 To 21166.73 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool No casing data is available 36.80 1200.00 CD5-316wpO3.1 (Plan: CD5-316) GYD-GC-SS 1200.00 2445.83 CD5-316wpO3.1 (Plan: CD5-316) MWD+IFR-AK-CAZ-SC 2445.83 14000.00 CD5-316wpO3.1 (Plan: CD5-316) MWD+IFR-AK-CAZ-SC 14000.00 15500.00 CD5-316PB1wpO7 (Plan: CD5-316PB1) MWD 15500.00 21165.95 CD5-316PB1wpO7 (Plan: CD5-316PB1) MWD+IFR-AK-CAZ-SC K 0 030U60-- 30-- 0 0 d c d U 0- 16000 16250 16500 16750 17000 17250 17500 Partial Measured Depth TC View CD5-316PB1 wp07 14000.00 To 21166.73 o zm ie s�rW�pm1 rv..: w5s®u6ca6 16xpW.1 rypn: msB.&DrIFP�MS23aL a <aalupa.l rya.: ms5tgm.l.a.ulcu.sc 61.pn lA+n: cowf811 91165.95 CWat6G.IMpT (Wn; [U9YA�91RAWCPZSL CASING DETAILS No c.ft Dale is available -60/300 -90/270 -120/240 -30/ uo..:m mry xa. wse i� anim �e��1�o"s Isa�.n mm 9u s9 Nes 1e A..a.W .N.am ]]3.N NeSN -0ile3 AVB51 Ii19Ce.4 I i2.St &G -t OiBBB9 ABMb S Y. ,9.ieai9 101 18. 651 iA52W -I 01AN Q. ..Sl 1... 6N.65 11 0/360 o.m. om i'awN'w°, 0 14000 alp Joh 13d540t .o .RA 1.u:Az �/ 14000 14190 z00 000 1.91280 `i 011(upL W1B1BON 00 le..m nuxA. 14190 14370 14370 — 14560 14560 14740 14740 -- 14930 14930 15110 15110 - — -- 15300 15300 — 15550 15550 15800 15800 — 16050 16050 16300 16300 — 16550 16550 16800 16800 17050 17050 —"— 17300 17300 17780 30 17780 18270 16270 -- 18750 18750 19230 19230 - 19720 19720 20200 20200 20680 20680 21166 -314 \ - �� `,� `.� � �� � r� rte• ' %1 � l 12 i 120 -150/210 150 -180/180 A AC Wells Only March 03 20171, . I , F(NOwells ONLY T a Spider) CD5-316PB 1 wp07 CD5-316wp03,1 _ Fasting (4000 usff/in) CD5 Alpine West Pad Easting (4000 usft/in) m CD5-11 CD4 -07 � CD5-01 CD5-05 CD4 -26 CD2 -43 CDP `,L1 a 0 0 c N CD5-315PB1 CD5-313PB7 CD5-315 CD5-313 \ CD5-18L1 CD f7 AC Flipbook Casing Details Survey Program CDS-3�6PB�wpo7 NO asing data is avaAaCle Depth From Depth00 SD5.316lan T441 36.e0 -440.00 CD5-316wP03.1(Plan: CD5-)16) CYNGC-SS 2300.00 x555.63 CD5-316wPO3.1(Plan: CDS-316) MWD.IFR-AK CAZ SC x440-63 19000.00 CD5-316wP03. 7(Pla CDg-31 MWD.IF0. qK{ALSC 36.8o L Qo TO 1000 oo 15000.00 25500.04 CD5-326PBIw 7(Plan: CD5.316PBl) MWD • • 15500.00 xn6595 CDS-316P62wP07(Plan:CD5916PBt) MWDNFR-AK-CgZSC 0 14000 MD Azi 0/36o CDs-17L1wpog 14000 14190 14000.00 224.59 Rig: CD5-20L1 14190 14370 15899.67 224.59 go 14370 14560 15929.67 223.96 - o /33 0 15949.67 223.96 /, . _ 1456o 14740 17186.23 186.51 Rig: Cb5-20 CD5-12 14740 14930 19643.04 186.51 CD5�1]wp09 z„65.96186.51 CD5-21 6�CD5-313PB1 14930 1511� 15110 153-) - 0 3100/ i } 6' 15300 15550 �- 15550 15800 3 y \� �\ 15800 16050 16050 16300 igo 16300 16550 - 0/2]0 1-- — i :i — - - ;- — 16550 16800 t "II 111 f 16800 17050 CD5-313 17050 17300 11 17 300 17780 30 CD5-315PB1 17780 18:' �.`* 18270 18750 CD5-315 CD5-314Xwp07 ,8750 19230 CD5-lgwpo'$ (8D) 60 19230 19720 CD 1 L1W 08 8D ` – ,9720 20200 5- 9 p 5"],, / ` 20200 —- 2o68o -150/210 1 150 2o68o 21166 90 -18o/18o CD5-18L1 1259, March 03 2017 CD5-316PBiwp07 i000.00 To 2500.00 MD Azi 14000.00 224.59 15899.67 224.59 15929.67 223.96 15949.67 223.96 17186.23 186.51 19643.04 186.51 21165.95 186.51 -6o/300/ /270 Casing Details 14000 14000 Survey Program 14190 No easing data is available Depth From Depth To SurveylPlan Tool 14740 36.80 1200.00 C053$6wp431(Plan: CD53di) GYD,GGSS 153uO 1200.00 244583 CDS 316wPO3 1 (Plan: CDS-316) MWDAFR-AK4A2.SC 15800 244583 14000.00 CD5-316wpo3I(Plan: CDy,6) MWDrIFRAK.CA2-SC 16550 14000.00 15500.00 CDS-316PBtwp07(Plan: CD5-3t6PBI) MWD 17050 15500.00 21565.95 CD5-316PB1wpD)(Plan; CDS-316PBQ MWDNFA-AK-CAI-SC 0/36o 18270 18750 18750 go -30 / 33 - �CD,,W7pogvw -120 / 240\---- -150/21 40\---- -150/21 13:01, March 03 2017 -=D52si314 C, 1(I _ Q0 CD5-19wpo D)I,, 12 4 \CD5 9Twno8I'BDi' 3S5 -w I01�o - P (9c) / %120 --__ �D -18 - — 150 FcD5-31 go i -180/18o CD5-18L1 0 14000 14000 - 14190 14190 14370 14370 1456o 1456o 14740 14740 14930 14930 151- 15110 — 153uO 15300 15550 15550 15800 15800 16050 16050 16300 16300 16550 16550 16800 16800 17050 17050 17300 17300 17780 17780 18 18270 18750 18750 19230 19230 19720 19720 20200 20200 2o68o 2o68o 21166 CD5-3i6PBiwp07 25oo.00 To 15800.00 MD Azi 14000.00 224.59 15899.67 224.59 15929.67 223.96 15949.67 223.96 17186.23 186.51 19643.04 186.51 21165.95 186.51 -6o/-- /270 6o/ /270 -120/: 13:02, March 03 2017 Casing Details — 14000 14000 Surrey %OgFdm 14190 No casing data 6 available Depth Fh Dapth To Survey/Plan Too] 14740 36.80 1200.00 CD5316wp03.1(Plan: CDS-316) CYD GC -SS 15300 1200.00 2445.83 CD5316wp03.1(Plan: CDy16) MWD.IFRAK-CAZ-SC 15800 244583 14000.uo CD5116wp03a(Man: CDS-315) MWD.IFRAKCAZ-SC 16550 1g0Do.0o 15500.00 CD5-316PB1wpD7(Plan: CDg aSPBQ MWD 17050 8500.00 21,6595 CD5-316PB1wp07(Man; CDS-316PB1) ANNNIFR-AKCAZ-5C 0/360 -18o/180 m 0 — — 14000 14000 14190 14190 14370 14370 1456o 1456o 14740 14740 14930 14930 151,.,> 15110 15300 15300 15550 15550 15800 15800 16050 16050 16300 16300 16550 16550 16800 16800 17050 17050 17300 17300 1778o 17780 18 18270 18750 18750 19230 19230 19720 19720 20200 20200 - ---- 20680 2o68o 21166 CD5-3i6PBlwp07 15800.00 To 21165.95 MD Azi 14000.00 224.59 15899.67 224.59 15929.67 223.96 15949.67 223.96 17186.23 186.51 19643.04 186.51 21165.95 186.51 -6o/-- /270 6o/ /270 -120/: 13:03, March 03 2017 casing Details 14000 14000 survey Program 14190 No rasing data is avlable Depth From Depth To Survey/Plan Tool 14740 36.80 1200.00 CD5-316wpo3.1(Plan: CD5-316) GTD GC -55 15300 1200.00 3445.83 CD5316wp03.1(Plan: CD916) MWIHFR-AK{AZ-5C 15800 244583 14000.00 CD5-316wp031(Plan: CDS-316) MWDJFR As CAZ-SC 16550 14000.00 15500.00 CD5916PB1wp%(Plan: CDy3161`131) MWD 17050 155o0.D0 2u65.95 CD5-316PB1wPD)(Plan: CD5-316PBt) MWDHFR-AK-CAZ-SC 0/360 -18o/18o m 0 14000 14000 14190 14190 14370 14370 1456o 1456o 14740 14740 14930 14930 151'^ 15110 15300 15300 15550 15550 15800 15800 16050 16050 16300 16300 16550 16550 16800 16800 17050 17050 17300 17300 1778o 17780 18 18270 18750 18750 19230 19230 19720 19720 20200 20200 20680 2o68o 21166 Errors Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316PB1 Plan: CD5-316PB1wp07 Errors Report 03 March, 2017 Errors Report Company: ConowPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CD5-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 Q 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 Q 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: CD5-316P61 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° Well Plan: CDS-316 Audit Notes: Well Position +N/ -S 0.00 usft Northing: Latitude: PLAN +E/ -W 0.00 usft Easting: Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore Plan: CD5-316PB1 Magnetics Model Name Sample Date Declination (`) BGGM2016 4/15/2017 17.21 Dip Angle C) 80.81 Field Strength (nT) 57,505 Design CD5-316PB1wp07 Audit Notes: Survey Tool Program Version: Phase: PLAN Tie On Depth: 14,000.00 Vertical Section: Depth From (TVD) +NI -S +Ey-W Diroction (usft) (usft) (usft) (°) 36.80 000 0.00 215.38 3WO1710:40:31AM Page 2 COMPASS 5000.1 Build 74 Survey Tool Program Date 3/3/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 36.80 1,200.00 CD5-316wp03.1 (Plan: CD5-316) GYD-GC-SS Gyrodata gyro single shots 1,200.00 2,445.83 CD5-316wp03.1(Plan: CDS-316) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,445.83 14,000.00 CD5-316wp03.1(Plan: CD5-316) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 14,000.00 21,165.95 CD5-316PB1wp07(Plan: CD5-316PB1) MWD+IFR-AK-CAZ-SC MWD -IFR AK CAZ SCC Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert, Error Lat. Error Harz. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 36.80 0.00 0.00 0.00 -34.00 0.00 0.00 0.00 100.00 1.15 0.00 0.00 29.20 1.15 0.05 0.05 116.30 1.15 0.00 0.00 45.50 1.15 0.19 0.19 20" x 42" 200.00 1.15 0.00 0.00 129.20 1.15 0.19 0.19 300.00 1.15 0.00 0.00 229.20 1.15 0.34 0.34 400.00 1.15 0.00 0.00 329.20 1.15 0.48 0.48 500.00 1.15 1.50 135.00 429.19 1.15 0.56 0.56 600.09 1.16 3.00 109.67 529.20 1.15 0.61 0.61 3WO1710:40:31AM Page 2 COMPASS 5000.1 Build 74 Errors Report Company: ConowPhillips(Alaska) Inc. -VVNS Local Co�ordfnate Reference: Well Plan: CD5-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CDs Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Pian: CD5-316 North Reference: True Wellbore: Plan: CDS-316PB1 Survey Calculation Method: Minimum Curvature Design: CD5-316PB1wp07 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hoa. Error (usft) (usft) (1) V) (usft) (usft) (usft) (usft) 700.00 1.16 5.48 113.74 628.83 1.15 0.69 0.68 800.00 1.16 7.97 120.95 728.13 1.15 0.79 0.78 900.00 1.17 10.47 16.87 826.83 1.15 0.92 0.89 1,000.00 1.18 12.96 24.18 924.74 1.15 1.07 1.02 1,100.00 1.19 15.46 25.82 1,021.67 1.15 1.25 1.15 1,200.00 1.21 17.96 26.65 1,117.44 1.15 1.45 1.30 1,287.35 1.22 20.14 26.70 1,200.00 1.14 1.54 1.36 1,300.00 1.22 20.14 26.58 1,211.88 1.13 1.54 1.36 1,393.86 1.23 20.14 26.76 1,300.00 1.14 1.58 1.37 1,400.00 1.23 20.35 26.73 1,305.76 1.14 1.58 1.37 1,500.00 1.26 23.68 26.63 1,398.46 1.14 1.66 1.37 1,600.00 1.29 27.05 27.00 1,488.81 1.13 1.79 1.39 1,700.00 1.33 30.45 28.10 1,576.47 1.12 1.97 1.42 1,800.00 1.37 33.87 29.43 1,661.12 1.11 2.20 1.45 1,900.00 1.41 37.30 30.73 1,742.44 1.11 2.49 1.49 2,000.00 1.47 40.74 31.92 1,820.12 1.12 2.81 1.55 2,100.00 1.52 44.19 33.00 1,893.88 1.14 3.18 1.61 2,200.00 1.58 47.64 33.96 1,963.44 1.17 3.59 1.67 2,300.00 1.65 51.10 34.83 2,028.55 1.22 4.02 1.74 2,400.00 1.72 54.57 35.62 2,088.95 1.28 4.49 1.82 2,445.83 1.78 56.15 35.70 2,115.00 1.24 4.63 1.83 103/4" x 13.1/7' 2,465.83 1.78 56.15 35.76 2,126.14 1.24 4.66 1.83 2,500.00 1.81 57.34 35.89 2,144.87 1.23 4.72 1.81 2,600.00 1.89 60.81 36.36 2,196.26 1.24 4.92 1.77 2,700.00 1.97 64.28 36.92 2,242.36 1.26 5.18 1.74 2,800.00 2.05 67.75 37.56 2,283.01 1.29 5.49 1.72 2,884.83 2.12 70.70 38.11 2,313.09 1.34 5.79 1.72 2,900.00 2.12 70.70 38.20 2,318.11 1.35 5.85 1.73 3,000.00 2.13 70.70 38.83 2,351.17 1.45 6.23 1.82 3,100.00 2.13 70.70 39.39 2,384.22 1.55 6.64 1.92 3,200.00 2.14 70.70 39.88 2,417.28 1.67 7.07 2.03 3,300.00 2.15 70.70 40.30 2,450.34 1.79 7.51 2.14 3,400.00 2.16 70.70 40.67 2,483.39 1.93 7.97 2.27 3,500.00 2.17 70.70 40.99 2,516.45 2.06 8.44 2.40 3,600.00 2.18 70.70 41.27 2,549.51 2.20 8.93 2.54 3,700.00 2.19 70.70 41.51 2,582.56 2.34 9.42 2.68 3,800.00 2.19 70.70 41.73 2,615.62 2.49 9.91 2.82 3,900.00 2.20 70.70 41.91 2,648.68 2.64 10.42 2.97 4,000.00 2.21 70.70 42.08 2,681.73 2.79 10.93 3.12 4,100.00 2.22 70.70 42.23 2,714.79 2.94 11.44 3.27 4,200.00 2.23 70.70 42.36 2,747.85 3.09 11.96 3.43 4,300.00 2.25 70.70 42.47 2,780.90 3.25 12.48 3.59 4,400.00 2.26 70.70 42.58 2,813.96 3.40 13.01 3.74 3/32017 10:40:31AM Page 3 COMPASS 5000.1 Build 74 Errors Report Company: Con=Phillips(Alaska) Inc. -WNS Local Coordinate Reference: Project: Western North Slope TVD Reference: Site: CDs Alpine West Pad MD Reference: Well: Plan: CD5-316 North Reference: Wellbore: Plan: CD5-316PB1 Survey Calculation Method: Design: CD5-316PB1wp07 Database: Well Plan: CD5-316 Plan: 34.2+36.3 Q 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hoa. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 4,500.00 227 70.70 42.67 2,847.02 3.56 13.54 3.90 4,600.00 2.28 70.70 42.76 2,880.07 3.71 14.07 4.07 4,700.00 2.29 70.70 42.84 2,913.13 3.87 14.60 4.23 4,800.00 2.30 70.70 42.91 2,946.19 4.03 15.13 4.39 4,900.00 2.31 70.70 42.97 2,979.24 4.19 15.67 4.55 5,000.00 2.32 70.70 43.03 3,012.30 4.35 16.21 4.72 5,100.00 2.34 70.70 43.09 3,045.36 4.51 16.75 4.88 5,200.00 2.35 70.70 43.14 3,078.41 4.67 17.29 5.05 5,300.00 2.36 70.70 43.19 3,111.47 4.83 17.83 5.22 5,400.00 2.37 70.70 43.23 3,144.53 4.99 18.37 5.38 5,500.00 2.39 70.70 43.27 3,177.59 5.15 18.92 5.55 5,600.00 2.40 70.70 43.31 3,210.64 5.31 19.46 5.72 5,700.00 2.41 70.70 43.34 3,243.70 5.47 20.01 5.89 5,800.00 2.43 70.70 43.37 3,276.76 5.63 20.55 6.06 5,900.00 2.44 70.70 43.40 3,309.81 5.79 21.10 6.23 6,000.00 2.45 70.70 43.43 3,342.87 5.95 21.65 6.40 6,100.00 2.47 70.70 43.46 3,375.93 6.12 22.19 6.56 6,200.00 2.48 70.70 43.48 3,408.98 6.28 22.74 6.73 6,300.00 2.49 70.70 43.51 3,442.04 6.44 23.29 6.90 6,400.00 2.51 70.70 43.53 3,475.10 6.60 23.84 7.08 6,500.00 2.52 70.70 43.55 3,508.15 6.77 24.39 7.25 6,600.00 2.54 70.70 43.57 3,541.21 6.93 24.94 7.42 6,700.00 2.55 70.70 43.59 3,574.27 7.09 25.49 7.59 6,800.00 2.57 70.70 43.61 3,607.32 7.25 26.05 7.76 6,900.00 2.58 70.70 43.63 3,640.38 7.42 26.60 7.93 7,000.00 2.60 70.70 43.64 3,673.44 7.58 27.15 8.10 7,100.00 2.61 70.70 43.66 3,706.49 7.74 27.70 8.27 7,200.00 2.63 70.70 43.67 3,739.55 7.91 28.25 8.44 7,300.00 2.64 70.70 43.69 3,772.61 8.07 28.61 8.62 7,400.00 2.66 70.70 43.70 3,805.66 8.23 29.36 8.79 7,500.00 2.68 70.70 43.71 3,838.72 8.40 29.91 8.96 7,600.00 2.69 70.70 43.72 3,871.78 8.56 30.47 9.13 7,700.00 2.71 70.70 43.74 3,904.83 8.72 31.02 9.30 7,800.00 2.72 70.70 43.75 3,937.89 8.89 31.57 9.48 7,900.00 2.74 70.70 43.76 3,970.95 9.05 32.13 9.65 8,000.00 2.76 70.70 43.77 4,004.00 9.21 32.68 9.82 8,100.00 2.77 70.70 43.78 4,037.06 9.38 33.24 9.99 8,200.00 2.79 70.70 43.79 4,070.12 9.54 33.79 10.17 8,300.00 2.81 70.70 43.80 4,103.17 9.71 34.35 10.34 8,400.00 2.82 70.70 43.81 4,136.23 9.87 34.90 10.51 8,500.00 2.84 70.70 43.81 4,169.29 10.03 35.46 10.68 8,600.00 2.86 70.70 43.82 4,202.34 10.20 36.01 10.86 8,700.00 2.87 70.70 43.83 4,235.40 10.36 36.57 11.03 8,800.00 2.89 70.70 43.84 4,268.46 10.53 37.12 11.20 31312017 10:40:31AM Page 4 COMPASS 5000.1 Build 74 Errors Report Company: ConomPhillips(Alaska) Inc. -VMS Local Coordinate Reference: Project: Western North Slope TVD Reference: Site: CDS Alpine West Pad MD Reference: Well: Plan: CD5-316 North Reference: Wellbore: Plan: CD5-316PB1 Survey Calculation Method: Design: CD5-316PBiwp07 Database: Well Plan: CD5J16 Pian: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hors. Error (usft) (usft) (°i (°) (usft) (usft) (usft) (usft) 8,900.00 2.91 70.70 43.84 4,301.52 10.69 3768 11.38 9,000.00 2.92 70.70 43.85 4,334.57 10.85 38.24 11.55 9,100.00 2.94 70.70 43.86 4,367.63 11.02 38.79 11.72 9,200.00 2.96 70.70 43.86 4,400.69 11.18 39.35 11.89 9,300.00 2.98 70.70 43.87 4,433.74 11.35 39.90 12.07 9,400.00 2.99 70.70 43.88 4,466.80 11.51 40.46 12.24 9,500.00 3.01 70.70 43.88 4,499.86 11.67 41.02 12.41 9,600.00 3.03 70.70 43.89 4,532.91 11.84 41.57 12.59 9,700.00 3.05 70.70 43.89 4,565.97 12.00 42.13 12.76 9,800.00 3.07 70.70 43.90 4,599.03 12.17 42.69 12.93 9,900.00 3.08 70.70 43.91 4,632.08 12.33 43.24 13.11 10,000.00 3.10 70.70 43.91 4,665.14 12.50 43.80 13.28 10,100.00 3.12 70.70 43.92 4,698.20 12.66 44.36 13.45 10,200.00 3.14 70.70 43.92 4,731.25 12.82 44.91 13.63 10,300.00 3.16 70.70 43.92 4,764.31 12.99 45.47 13.80 10,400.00 3.18 70.70 43.93 4,797.37 13.15 46.03 13.97 10,500.00 3.20 70.70 43.93 4,830.42 13.32 46.58 14.15 10,600.00 3.21 70.70 43.94 4,863.48 13.48 47.14 14.32 10,700.00 3.23 70.70 43.94 4,896.54 13.65 47.70 14.50 10,800.00 3.25 70.70 43.95 4,929.59 13.81 48.26 14.67 10,900.00 3.27 70.70 43.95 4,962.65 13.98 48.81 14.84 11,000.00 3.29 70.70 43.95 4,995.71 14.14 49.37 15.02 11,100.00 3.31 70.70 43.96 5,028.76 14.30 49.93 15.19 11,200.00 3.33 70.70 43.96 5,061.82 14.47 50.49 15.36 11,300.00 3.35 70.70 43.96 5,094.88 14.63 51.04 15.54 11,400.00 3.37 70.70 43.97 5,127.93 14.80 51.60 15.71 11,500.00 3.39 70.70 43.97 5,160.99 14.96 52.16 15.88 11,600.00 3.40 70.70 43.96 5,194.05 15.13 52.72 16.06 11,700.00 3.42 70.70 43.98 5,227.10 15.29 53.27 16.23 11,800.00 3.44 70.70 43.98 5,260.16 15.46 53.83 16.41 11,900.00 3.46 70.70 43.98 5,293.22 15.62 54.39 16.58 12,000.00 3.48 70.70 43.99 5,326.28 15.78 54.95 16.75 12,100.00 3.50 70.70 43.99 5,359.33 15.95 55.50 16.93 12,200.00 3.52 70.70 43.99 5,392.39 16.11 56.06 17.10 12,300.00 3.54 70.70 44.00 5,425.45 16.28 56.62 17.28 12,400.00 3.56 70.70 44.00 5,458.50 16.44 57.18 17.45 12,500.00 3.58 70.70 44.00 5,491.56 16.61 57.74 17.62 12,600.00 3.60 70.70 44.00 5,524.62 16.77 58.29 17.80 12,700.00 3.62 70.70 44.01 5,557.67 16.94 58.85 17.97 12,800.00 3.64 70.70 44.01 5,590.73 17.10 59.41 18.14 12,900.00 3.66 70.70 44.01 5,623.79 17.27 59.97 16.32 13,000.00 3.68 70.70 44.01 5,656.84 17.43 60.53 18.49 13,100.00 3.70 70.70 44.02 5,689.90 17.59 61.08 18.67 13,200.00 3.72 70.70 44.02 5,722.96 17.76 61.64 18.84 13,300.00 3.74 70.70 44.02 5,756.01 17.92 62.20 19.01 3/32017 10:40:31AM Page 5 COMPASS 5000.1 Build 74 Errors Report Company: Con=Phillips(Alaska) Inc. -WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Plan: CD5-316 Wellbore: Plan: CD5-316P61 Design: CD5-316PB1wp07 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usft (Doyon Plan: 34.2+36.3 @ 70.80usft (Doyon True Minimum Curvature OAKEOMP2 19) 19) Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hoa. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 13,400.00 3.76 70.70 44.02 5,789.07 18.09 62.76 19.19 13,500.00 3.78 70.70 44.03 5,822.13 18.25 63.32 19.36 13,600.00 3.80 70.70 44.03 5,855.18 18.42 63.88 19.54 13,700.00 3.82 70.70 44.03 5,888.24 18.58 64.43 19.71 13,800.00 3.84 70.70 44.03 5,921.30 18.75 64.99 19.89 13,900.00 3.86 70.70 44.03 5,954.35 18.91 65.55 20.06 13,950.26 3.88 70.70 44.04 5,970.97 19.08 66.11 20.23 9 518" x 12.114" 14,000.00 3.88 70.70 44.04 5,987.41 19.08 66.11 20.23 14,100.00 3.92 70.70 44.04 6,020.47 19.15 66.48 20.32 14,200.00 3.94 70.70 44.04 6,053.52 19.15 66.67 20.32 14,300.00 3.96 70.70 44.04 6,086.58 19.16 66.86 20.32 14,400.00 3.99 70.70 44.04 6,119.64 19.16 67.06 20.33 14,500.00 4.01 70.70 44.04 6,152.69 19.17 67.26 20.34 14,600.00 4.03 70.70 44.05 6,185.75 19.17 67.47 20.34 14,700.00 4.05 70.70 44.05 6,218.81 19.18 67.67 20.35 14,800.00 4.07 70.70 44.05 6,251.86 19.19 67.89 20.36 14,900.00 4.09 70.70 44.05 6,284.92 19.21 68.10 20.37 15,000.00 4.11 70.70 44.05 6,317.98 19.22 68.33 20.39 15,100.00 4.13 70.70 44.06 6,351.03 19.23 68.55 20.40 15,200.00 4.15 70.70 44.06 6,364.09 19.25 68.78 20.42 15,300.00 4.17 70.70 44.06 6,417.15 19.27 69.01 20.44 15,400.00 4.19 70.70 44.06 6,450.21 19.29 69.25 20.46 15,500.00 4.22 70.70 44.06 6,483.26 19.31 69.49 20.48 15,600.00 4.24 70.70 44.06 6,516.32 19.33 69.73 20.50 15,700.00 4.26 70.70 44.07 6,549.38 19.35 69.98 20.52 15,800.00 4.28 70.70 44.07 6,582.43 19.37 70.23 20.55 15,899.67 4.30 70.70 44.07 6,615.38 19.40 7048 20.58 15,900.00 4.30 70.71 44.07 6,615.49 19.40 7048 20.58 KOP: 4°1100' DLS, J0° TF, for 30' 15,929.67 4.36 71.74 44.07 6,625.04 19.41 70.56 20.56 15,930.00 4.36 71.74 44.07 6,625.14 19.41 70.56 20.56 Hold for 20' 15,949.67 4.36 71.74 44.07 6,631.31 19.41 70.61 20.57 15,950.00 4.36 71.74 44.07 6,631.41 19.41 70.61 20.57 Start 3°1100' DLS, -82.73° TF, for 1236.44' 16,000.00 4.93 71.93 44.07 6,647.00 19.43 70.70 20.56 16,100.00 7.42 72.36 44.06 6,677.66 19.46 70.70 20.59 16,200.00 10.60 72.84 44.04 6,707.56 19.49 70.51 20.67 16,300.00 14.01 73.37 44.01 6,736.63 19.52 70.11 20.79 16,400.00 17.48 73.94 43.97 6,764.78 19.55 69.53 20.93 16,500.00 20.97 74.55 43.92 6,791.93 19.58 68.76 21.08 16,600.00 24.44 75.21 43.86 6,818.02 19.62 67.80 21.23 16,700.00 27.88 75.91 43.78 6,642.97 19.66 66.68 21.37 3/3/2017 10:40:31AM Page 6 COMPASS 5000.1 Build 74 Company: Con=Phillips(Alaska) Inc.-WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Plan: CDS-316 Wellbore: Plan: CD5-316PB1 Design: CD5-316PB1wp07 Errors Report Local Co-ordmate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CDS-316 Plan: 34.2+36.3 L@ 70.80usft (Doyon 19) Plan: 34.2+36.3 aQ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Horz. Error (ustt) (usft) (°) (°) (usft) (usft) (usft) (usft) 16,771.22 31.26 7642 43.70 6,860.00 1970 65.38 21.48 HRZ 16,800.00 31.26 76.64 43.70 6,866.70 19.70 65.38 21.48 16,900.00 34.58 77.41 43.61 6,889.17 19.74 63.93 21.56 17,000.00 37.82 78.21 43.50 6,910.29 1978 62.33 21.59 17,100.00 40.97 79.04 43.39 6,930.03 19.82 60.58 21.59 17,186.23 43.62 79.78 43.28 6,945.88 1916 58.96 21.56 17,186.44 43.62 79.78 43.28 6,945.92 19.86 58.96 21.56 Hold for 2456.97' 17,200.00 43.62 79.78 43.26 6,948.33 19.87 59.00 21.56 17,300.00 43.62 79.78 43.13 6,966.08 19.91 59.28 21.61 17,400.00 43.62 79.78 43.00 6,983.83 19.96 59.56 21.65 17,500.00 43.62 79.78 42.86 7,001.58 20.01 59.84 21.70 17,600.00 43.62 79.78 42.72 7,019.33 20.06 60.13 21.75 17,700.00 43.63 79.78 42.58 7,037.08 20.12 60.42 21.80 17,800.00 43.63 79.78 42.44 7,054.84 20.17 60.72 21.85 17,900.00 43.63 79.78 42.30 7,072.59 20.23 61.02 21.90 18,000.00 43.63 79.78 42.16 7,090.34 20.28 61.33 21.96 18,100.00 43.63 79.78 42.01 7,108.09 20.34 61.64 22.01 18,200.00 43.64 79.78 41.87 7,125.84 20.40 61.95 22.07 18,300.00 43.64 79.78 41.72 7,143.59 20.46 62.26 22.13 18,400.00 43.64 79.78 41.57 7,161.34 20.52 62.58 22.19 18,500.00 43.64 79.78 41.42 7,179.09 20.59 62.91 22.25 18,600.00 43.64 79.78 41.27 7,196.85 20.65 63.23 22.31 18,700.00 43.65 79.78 41.12 7,214.60 20.72 63.56 22.37 18,800.00 43.65 79.78 40.96 7,232.35 20.78 63.90 22.43 18,900.00 43.65 79.78 40.81 7,250.10 20.85 64.23 22.50 18,995.20 43.65 79.78 40.66 7,267.00 20.92 64.57 22.57 Kelubik 19,000.00 43.65 79.78 40.66 7,267.85 20.92 64.57 22.57 19,100.00 43.65 79.78 40.50 7,285.60 20.99 64.92 22.63 19,200.00 43.66 79.78 40.34 7,303.35 21.06 65.26 22.70 19,300.00 43.66 79.78 40.18 7,321.11 21.14 65.61 22.77 19,400.00 43.66 79.78 40.03 7,338.86 21.21 65.97 22.84 19,500.00 43.66 79.78 39.87 7,356.61 21.29 66.32 22.92 19,600.00 43.66 79.78 39.71 7,374.36 21.36 66.68 22.99 19,62458 43.66 79.78 39.64 7,378.72 21.40 66.84 23.02 CD6.314x KupC 020816 DK 19,643.04 43.66 79.78 39.64 7,382.00 21.40 66.84 23.02 Kup C - CD5316PB1 01.KupC 041316 NA - CD5-316PB1 01.KupC 041816 DK 19,643.40 43.66 79.77 39.64 7,382.06 21.40 66.84 23.02 Start 2°1100' DLS, 180° TF, for 1422.91' 19,686.30 43.51 78.91 39.58 7,390.00 21.44 66.97 23.36 LCU 19,700.00 43.51 78.64 39.58 7,392.67 21.44 66.97 23.36 3/32017 10:40:31AM Page 7 COMPASS 5000.1 Build 74 Errors Report Company: ConomPhiilips(Alaska) Inc. -WNS Local Co-ordlnate Reference: Project: Mstem North Slope TVD Reference: Site: CDS Alpine West Pad MO Reference: Well: Plan: CD5-316 North Reference: Wellbore: Plan: CD5-316PB1 Survey Calculation Method: Design: CD5-316PB1Wp07 Database: Well Plan: CD5-316 Plan: 34.2+36.3 Q 70.80ustt (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Let. Error Hom Error (waft) (usft) V) V) (usft) (usft) (usft) (usft) 19,800.00 43.20 76.64 39.54 7,414.08 21.52 67.09 24.00 19,900.00 42.86 74.64 39.50 7,438.89 2160 67.21 24.68 20,000.00 42.48 72.64 39.45 7,467.06 21.68 67.34 25.40 20,100.00 42.06 70.64 39.41 7,498.56 21.76 67.47 26.16 20,200.00 41.61 68.64 39.36 7,533.36 21.83 67.60 26.95 20,300.00 41.12 66.64 39.31 7,571 Al 21.91 67.73 27.75 20,400.00 40.60 64.64 39.26 7,612.66 21.99 67.87 28.57 20,500.00 40.05 62.64 39.21 7,657.07 22.06 68.00 29.41 20,600.00 39.47 60.64 39.16 7,704.57 22.14 68.14 30.25 20,700.00 38.85 58.64 39.11 7,755.12 22.21 68.28 31.09 20,800.00 38.22 56.64 39.06 7,808.64 22.28 68.42 31.92 20,900.00 37.56 54.64 39.00 7,865.09 22.35 68.55 32.76 20,942.60 36.87 53.78 38.95 7,890.00 22.41 68.69 33.58 Alp C 20,959.46 36.87 53.45 38.95 7,900.00 22.41 68.69 33.58 UJU 21,000.00 36.87 52.64 38.95 7,924.38 22.41 6869 33.58 21,065.95 36.17 51.32 38.90 7,965.00 22.47 68.83 34.38 Kingak F 21,066.32 36.17 51.31 38.90 7,965.23 22.47 68.83 34.38 Adjust TF to 180°, for 100' 21,100.00 36.17 50.64 38.90 7,986.44 22.47 68.83 34.38 21,165.95 35.69 49.32 38.86 8,028.85 22.51 68.92 34.91 CDS-316PBI IS 012617 DK aWO17 10:40:31AM Page 8 COMPASS 5000.1 Build 74 Company: ConowPhillips(Alaska) Inc.-WNS Project Mahan North Slope Site: CDS Alpine West Pad Welt: Plan: CD5-316 Wellbore: Plan: CD5-316P61 Design: CD5-316PB1wp07 Errors Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CD5-316 Plan: 34.2+36.3 Q 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Formations Measured Vertical Dip Depth Depth DIP Direction (usft) (usft) Name Lithology 19,643.04 7,452.80 Kup C 21,065.95 8,035.80 Kingak F 18,995.20 7,337.80 Kalubik 20,942.60 7,960.80 Alp C 19,686.30 7,460.80 LCU 16,771.22 6,930.80 HRZ 20,959.46 7,97080 UJU Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 15,900.00 6,686.29 -9,688.24 -9,369.90 KOP: 4"/100' DLS, -30" TF, for 30' 15,930.00 6,695.94 -9,708.58 -9,389.73 Hold for 20' 15,950.00 6,702.21 -9,722.25 -9,402.91 Start 3°/100' DLS, -82.73° TF, for 1236.44' 17,186.44 7,016.72 -10,786.86 -9,896.67 Hold for 2456.97' 19,643.40 7,452.86 -13,189.20 -10,170.98 Start 2°/100' DLS, 180° TF, for 1422.91' 21,066.32 8,036.03 -14,462.84 -10,316.41 Adjust TF to 180°, for 100' 21,166.32 TD: 21166.32' MD, 8099.65' TVD Checked By: Approved By: Date: 3/32017 10:40.31AM Page 9 COMPASS 5000.1 Build 74 Pool Report 12:55, March 03 2017 C p5-316 P B 1 w p07 Name WELLBORE TARGET DETAILS (MAP W RDINATES) ND Shape 01. KO 114 Mk 7452.80 C 1. (Ra ..:1320.001 Quarter Mile View CDS316PB101.KUpC 091816 DK 7452.80 cid. (Re,.: 100.00) 19P� 01 coy 14000- 7000 4000 7000 1 U) O O 0 - + d w I z Woo,.'. -,7000 ! - _ - O (n CD5.315PS1 C CD5-316PB1wp07 -14000 - CD CD g1 G , �9C1 a��@09 ,N'P �OOi ', CyG y1 CO 5.316wp03.1 i GD5.315 -21000 -CD5-314Xwp07 -- -28000 -21000 -14000 -7000 0 7000 14000 21000 28000 West( -)/East(+) (7000 usft/in) I I I 4- CD5-316PB1wp07 Surface Location I!,j CPA: Coo;dir�ate Ccn:erer From Datum NAD83 . Region: alaska r Latitude/Longitude IDecimalDegrees * UTM Zone: r South * State Plane Zone:Units: w—ft r Legal Description (NAD27 only) Datum: t09Region alaska C' Latitude/Longitude IDecimalDegrees, f UTM Zone: True r South R State Plane Zone: F-3- Units: us ft r Legal Descdption (NAD27 onlyj Starting Coordinates: Endnng Coordinates: k 3 X: 7489283.58 49250.430131659 Y'. 5965580.48 Y: 5965834.51975506 Iii;I .J DatumNAD83 . Region alaska C Latilude/Longitude IDecimalDegrees * UTM Zone: r— r— South 6 State Plane Zone: F-----] Units: us -ft . r Legal Description (NAD27 only) Starting Coordnater - X: 114892133.58 Y: 5965580.46 i .Transform j Quit Help Datum: NADP7 I Region alaska C" Latitude/Longitude IDecimal Degrees C UTM Zone: True r South l" State Plane Zone: T-,] Units: us -ft . 0' Legal Demiptio n (NAD27 only) - Sega Township: 011 I" J Rage: 004 E . Meridian: P---3 Section FIB FNL 379.60508 FEL . 2727.5022 L . �.Traruform,__,�I Quit Help CD5-316PB1wp07 Surface Casing 4 CPA: Coordinate Converter .O w'a'. -From:--- — To, Datum NAD83 Region: alaska Daum: NAD27 Region alaska . t^ Latitude/Longitude IDecimalbegrees, Latitude/Longitude IDecimaiDegrees C' UTM Zone:F— rSouth r UTM Zone: True r- South I r State Plane Zone: �� Units: us4l . � r State Plane Zone: I' Units: us.ft a r Legal Description (NAD27 only) I r Legal Description (NAD27 only) 3 )- Starting Coordnetes: X 1488792.70 -Ending Coordnates:--------------I K 348759.516754991 Y: 596493274 Y: 596518679071353 ff�Transform _' Qut Help n CPA[Ccordinate Converter - -� From: Datum NAD83 . Region: alaska . Datum NAp27 Region: alaska r' Latitude/Longitude Decimal Degrees_7j r Latitude)Longitude IDecimaiDegifts r UTM Zone:I — r- South r UTM Zone: True r- South r State Plane Zone: F--3- Unkp.g . r State Plane Zone:Units: fu—,. -ft --3 r Legal Descrnp6sn(NAD27 only) r Legal Dwoription(NAD27only) rStarting Coordinates: K 148879270 Legal Description Township: 011 F Range: o54 ''. Y: 5964932.74 i -D Meridian IV J Section 18 FNL1037.1193 FEL 3207.8957 Quit Help CD5-316PB1wp07 Intermediate 1 Casing rZ CPA7 Coordinate Datura: FN—AD-83 . Region: alaska . r Latitude/Longitude DecimalDegrees r UTM Zone: r— r South r State Plane Zone: r4� Units: w.ry r Legal Deacopliun(fdo.D27only) Sladig Coordinates: -- X: 1461039.27 N 5957367.79 Datura NAD27 Region: alaska r Latitude/Longitude DecimalDegrees -71 r UTM Zone True r South (' Slate Plam Zone: F-- Units: urft . C-' Legal Description (NAD27 only) Township: 011 [W:-:] Range: ro F-_-3 Meridian:— Section:23 FNL 348.8488 FEL 594.47637 > — Translamy Quit I Help Q CPA1Coordinate Con is -Frooc - To:- DatumNA083 Region: alaska Delum NAD27 . Regions: alaska r Latitude/Longitude IDecimalDegiees r Lafitude/Longitude IlDecirnalDegrees r UTM Zone: r— r South r UTM Zone: True r South r• State Plane Zone: I" -D- Units: us4t r State Plane Zone: F- D, Units: ,,e.(t r Legal Desonipfion (N.QD27 only) r Legal Description (NAD27 only) r Starting Coordnahm. Ending Coordnates: X� 1481039.27 � X: 341005.672820244 Y. 5957367.79 — Y: 5957622.06735199 Transform Quit Help rZ CPA7 Coordinate Datura: FN—AD-83 . Region: alaska . r Latitude/Longitude DecimalDegrees r UTM Zone: r— r South r State Plane Zone: r4� Units: w.ry r Legal Deacopliun(fdo.D27only) Sladig Coordinates: -- X: 1461039.27 N 5957367.79 Datura NAD27 Region: alaska r Latitude/Longitude DecimalDegrees -71 r UTM Zone True r South (' Slate Plam Zone: F-- Units: urft . C-' Legal Description (NAD27 only) Township: 011 [W:-:] Range: ro F-_-3 Meridian:— Section:23 FNL 348.8488 FEL 594.47637 > — Translamy Quit I Help CD5-316PB1wp07 TD M CPA] Coord irate Convener r From To. Datum NAD83 . Region: alaska I Datum: NAD27 Region: aWTa f Latitude/Longi IDecimal Degrees C Latitude/Longitude IDecimalDegfees (' UTM Zone: r— r South C' UTM Zone: True r South C• State Plane Zone: F---3 Unk us.ry . C•' State Plane Zone: F --J- Units: usft . r Legal De OIon (NAD27 only) I t' Legal Description (NAD27 of ijJ '- Starting Coordinates: X: 11473668.70 r Ending Coordinates------- ----__-.__--, f x 1 338634.817258491 Y: 5951253.30 Y 5951507.65756284 Y. 5951253.30 L____-____—__. Transform � Quit Help Lal CPAI Coordinate Converter -- From: - -_ _.-- -- To: _-- Datum: ptAp88 Region: alaska Datum: Npp27 Region: P.A. f Latitude/Longitude IDecimaiDegrees f Latitude/Longitude IDecimalDegi (- UTM Zone: F— f- South f UTM Zone: T= r South R State Plane Zone: 1' J Units. urft . f State Plane Zane: �] Units: us{t r' Legal Description INAD27 onlyl R Legal Description (NAD27 only) r Starling Coordinates: X 11478668.70 Legal Description -J] Township: 011 FN Range: 003 I` --I Y. 5951253.30 Meridian: I" -7D Section FNL 4364.8384 FF.] 2840.4712 Tiansfam—, Quit I Help Tollerable Collision Risk Worksheet As -built REVI DATE IBYICK IAPPI DESCRIPTION REV DATE BY CK I APP I DESCRIPTION 1 4/24/15 1 CZ I DB I C.A.1 UPDATED PER K150003ACS 2 5/2/16 CZ GD C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT w LOCATION OF THIS SURVEY T12 r SQ T11N PM CD4 TO ALPINE CD5 ACCESS ROAD a, CD N v 0 V` A mD m LL IT col TP VICINITY MAP NOT TO SCALE LEGEND: 0 PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 18, T. 11 N., R. 4 E., U.M. PPO CD -5 OF PAD O��OER SN n�Q'Oslos xoo*o%m OESGN ��oQoaws p•�tJ,t\ %x xNxN �Np :: ��� L. ym ^"n PLANT N N �o NOTE: 15.4 52" r CONDUCTOR CD5—x14 WAS PLUGGED AND Ao ABANDONED WIMP APRIL 2016. r KUUKPIK UMIAQ ALPINE SURVEY OFFICE PHONE :907-6704739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS—BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 1 OF 3 2 1 1 14/24/15 1 CZ I DB I C. A.1 UPDATED PER K150003ACS 12 15/2/161 CZ I GD I C. A.1 UPDATED PER K160003ACSI ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M.1 O WELL 'Y' 'X' LAT.(N) LONG.(W) SFNLINEFWLS GND EXIST. CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 1 33.9 CD5-x01 5,965, 661.64 1,489,572.44 70' 18 49.155 151' 13 21.378 293 _f9 2489 27.6 34.1 CD5-x02 5,965,656.28 1 489 553.29 70' 18 49.099 _T51' 13 21.934 �9 2470 28.1 34.1 CD5-x03 5,965,650.92 1 489 534.00 70' 18 49.042 151' 13 22.493 305 _-Si 2451 28.4 34.1 CD5-x04 5,965,645.24 1 489 514.77 70' 18 48.982 151' '1323.051 1 2432 26.6 34.2 CD5-x05 5,965,639.80 1 489 495.46 70' 18 48.925 _T51' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1 489 476.20 70' 18 48.870 _T51' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151' 13 24.724 328 2374 27.9 34.3 CD5-x0B 5,965,623.88 1 489 437.69 7 18 0' 48.757 151' 13 25.287 334 23 55 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 1 5.965.613.12 1 489 399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 1 34.1 CD5-x11 5.965.607.66 1 489 379.86 70' 18 148.586 _T51' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489 360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965,596.59 1 489 341.43 70' 18 48.470 151' 13 28.079 363 2259 25.1 34.2 6E)5 x1=r rr965-54J H--4693====- 76'-10' 48.444-- T 368- z"?46- mL7-& -34-.-2 CD5-14X 5,965,589.94 1 489 317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1 489,283.58 70' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1 489264.31 70' 18 48.243 _T51' 13 30.316 386 2183 27.7 34.0 CD5-x18 5.965.569.79 1 489 245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5.965.558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965,553.51 1 489 187.22 70' 18 48.016 151' 13 32.552 409 2106 -TO _87 27.8 33.8 CD5-x22 5,965,548.14 1 489 168.15 70' 18 47.959 151' 13 33.105 415 27.7 33.7 CD5-x23 5,965,542.72 1 489 148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1 489 129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1 489 110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5,965,526.59 1 489 091.09 70' 18 47.732 151' 13 35.340 438 2010 26.3 33.7 CD5-x27 5,965,521.20 1 489 071.88 70' 18 47.675 -T51' 13 35.897 444 1991 27.5 33.7 CD5-x28 5.965.515.81 1 489 052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29 5 965 510.40 1 489 033.34 70' 18 47.561 151 13 37.015 455 1953 27.6 33.6 CD5-x30 5 965 504.97 --TO' 18 47.504 151' 13 37.575 461 1934 25.3 33.6 CD5-x31 5 965 499.57 I 1 489 994.73 70' 18 47.447 1 151' 13 38.135 467 1915 26.6 1 33.6 CD5-x32 5,965,494.13 70' 18 47.390 151' 13 38.694 473 1895 26.8 33.6 CD5-x33 5.965.488.75 1.4- _ 488 956.35 70' 16 47.333 151 13 39.248 478 1876 27.0 1 33.6 Should be 1,488,994.73 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. KUUKPIK UMIAQ ALPINE SURVEY OFFICE PHONE: 907-6701739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE N0.DRAWING N0: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 1 OF 3 2 CD5-316wp03.1 DDI 7.215 6500 '13000 19500 1 26000 -3/4" x 13-12 95/8 x 12-1/4 Measured Depth Gootletic Datum: Depth Relerence: P1an:34.246.3 @ 70.Wusft(Doyon 19) o a Rig: Doyon 19 m o 0 ^I Cl 0 0 ^o am m N N N a$ Mr N NI N I Base Permafrost Kalubik SURVEY PROGRAM epth From Kup C5 Survey/Plan Too, a5- C-90 K-2 Oannik CD5316wp03.1 (Plan: C05316) GYD-GC-SS c Allow 97 ASuW7 CD5-316wp03.1(Plan: CD5-316) MWD y I f LCU ` r 1 CD5-316wpO3.1 (Plan: CD5-316) \ 2445.83 I CD5-316wp03.1(Plan: CD5-316) MWD 2445.83 -00 CD5-316Wp03.1(Plan: CD5316) MWDiIFR-AK-0AZ-SC 18789.57 FY -3 Albia 196 HR2 y CD5-316wp03.1 (Plan: CD5-316) s 18789.57 I f, I CD5-316wp03.1 ,Plan: CD5-316) o0 0 0 6500 '13000 19500 1 26000 -3/4" x 13-12 95/8 x 12-1/4 Measured Depth Gootletic Datum: Depth Relerence: P1an:34.246.3 @ 70.Wusft(Doyon 19) o a Rig: Doyon 19 m o 0 ^I Cl 0 0 ^o am m N N N a$ Mr N NI N I Surface Location North / Y: East / X: Pad Elevation: 34.00 CASING DETAILS 270 Plan Summary l 0 180 37 - 400 400 - 591 591 - T1 tit - 961 961 - 1141 1141 - 1331 1331 - 1$11 1511 - 1700 1]00 2761 2]61 3631 3831 - 4890 4690 - 5950 5950 - 7011 ]011 - W71 8071 - 9141 9141 - 10201 10201 - 12331 231 - 14461 61 - 18591 i6581 - 18711 6711 - 20M 20841 22971 22971 25101 25101 2]22 TVD MD Name Rg 116.30 116.30 20" x 42" klagne0c Model: BGGM2018 T 2185.80 2445.83 103/4" x 13-1/2' Magnetic Motlel Dale: 15 -Apr -17 6041.77 13950 .26 85/8'x12-1/4' Magnant Declination: 1721° 7438.83 18789.57 Tx8-3/4' TO convert a Magnetic Direction to a Twe Dlrafion. AM 17.21°Fast SECTION DETAILS Sec MD Inc Axl TVD �W-S +V -W Din TFW9 VSed Target 1 36.80 0.00 0.00 36.60 0.00 0 00 0.00 0.00 0.00 2 40000 0.00 0.00 400.00 0.00 0 00 0.00 0.00 son 3 600.09 3.00 M.00600 00 4.92 -1.79 1.50 200.00 4.63 4 1287.35 20.14 208.57 1270.80 -126.68 85.01 2.50 10.00 116.40 5 1393.86 20.14 208.57 1370,80 -158.89 -82.55 0.00 0.00 145.86 6 244583 56.15 222.46 2185.80 -69.51 477]] 3.50 19.44 584.65 7 246583 56.15 222.46 2196.94 -66en 488.99 0.00 000 595.22 8 2884.63 70.70 224.59 2383.89 $40.4 -746.66 3.50 796 82].3] 9 17025.57 70.70 224.59 ]056.37 -10444.76 -10115.65 0.00 000 8935.28 10 18789.18 8600 172.62 ]438.60-12023.63-10623.52 3.00 90.0910428.11 CW316011-3I601,1W1316NA 1118809.16 80.00 172.62 ]660.20-1443.42-1062095 0.00 000104alls 12 18928.20 89.51 172.62 ]646.]8 -12159.35 -10605.93 3.00 9.0210586.96 13 2]823.65 89.51 172.62 7500,80 -20982]5 -9462.87 0.00 0.001946157 CD5316 D2.1ce 041316 NA Prepared by: Checked by: Accepted by: SURVEY PROGRAM epth From Depth To Survey/Plan Too, 36.80 1200.00 CD5316wp03.1 (Plan: C05316) GYD-GC-SS 1200.00 2200.00 CD5-316wp03.1(Plan: CD5-316) MWD 1200.00 2445.83 CD5-316wpO3.1 (Plan: CD5-316) MWDiIFR-AK-CAZ-SC 2445.83 3945.83 CD5-316wp03.1(Plan: CD5-316) MWD 2445.83 18769.57 CD5-316Wp03.1(Plan: CD5316) MWDiIFR-AK-0AZ-SC 18789.57 20289.57 CD5-316wp03.1 (Plan: CD5-316) MWD 18789.57 27823.65 CD5-316wp03.1 ,Plan: CD5-316) MWD.IFR-Ai Surface Location North / Y: East / X: Pad Elevation: 34.00 CASING DETAILS 270 Plan Summary l 0 180 37 - 400 400 - 591 591 - T1 tit - 961 961 - 1141 1141 - 1331 1331 - 1$11 1511 - 1700 1]00 2761 2]61 3631 3831 - 4890 4690 - 5950 5950 - 7011 ]011 - W71 8071 - 9141 9141 - 10201 10201 - 12331 231 - 14461 61 - 18591 i6581 - 18711 6711 - 20M 20841 22971 22971 25101 25101 2]22 TVD MD Name Rg 116.30 116.30 20" x 42" klagne0c Model: BGGM2018 T 2185.80 2445.83 103/4" x 13-1/2' Magnetic Motlel Dale: 15 -Apr -17 6041.77 13950 .26 85/8'x12-1/4' Magnant Declination: 1721° 7438.83 18789.57 Tx8-3/4' TO convert a Magnetic Direction to a Twe Dlrafion. AM 17.21°Fast SECTION DETAILS Sec MD Inc Axl TVD �W-S +V -W Din TFW9 VSed Target 1 36.80 0.00 0.00 36.60 0.00 0 00 0.00 0.00 0.00 2 40000 0.00 0.00 400.00 0.00 0 00 0.00 0.00 son 3 600.09 3.00 M.00600 00 4.92 -1.79 1.50 200.00 4.63 4 1287.35 20.14 208.57 1270.80 -126.68 85.01 2.50 10.00 116.40 5 1393.86 20.14 208.57 1370,80 -158.89 -82.55 0.00 0.00 145.86 6 244583 56.15 222.46 2185.80 -69.51 477]] 3.50 19.44 584.65 7 246583 56.15 222.46 2196.94 -66en 488.99 0.00 000 595.22 8 2884.63 70.70 224.59 2383.89 $40.4 -746.66 3.50 796 82].3] 9 17025.57 70.70 224.59 ]056.37 -10444.76 -10115.65 0.00 000 8935.28 10 18789.18 8600 172.62 ]438.60-12023.63-10623.52 3.00 90.0910428.11 CW316011-3I601,1W1316NA 1118809.16 80.00 172.62 ]660.20-1443.42-1062095 0.00 000104alls 12 18928.20 89.51 172.62 ]646.]8 -12159.35 -10605.93 3.00 9.0210586.96 13 2]823.65 89.51 172.62 7500,80 -20982]5 -9462.87 0.00 0.001946157 CD5316 D2.1ce 041316 NA Prepared by: Checked by: Accepted by: APprwed by. Kurt Alexa 27ygllian 97 ASub9 5165's Albian 96 7040.6 HR2 7k%fiiik 1320a Annotation Base Pwmakoat IWP: Stan 1.51100 DLS. 200 -TF, for 200.09 Start 2.51100' D -S, 10°T5 for 687.26 HON for 106.52' 2296.8 Start 3.57100' DLS, 19.44°TF. far 1051.97 HoM for 20' C 30 Srart 3.5710' DIS, 7,95 -TF. for 419.01 2823.8 Hok1 for 14141.13' Shir137100 DLS,-0089°TF, for 1763.8' HM for 20 0.10 Shirt 31100' OLS, 4W TF, for 117.01' HO for 8897.65' TD: 2]92603'MD.]5209 TVD 36ss;f APprwed by. Kurt Alexa 27ygllian 97 ASub9 5165's Albian 96 7040.6 HR2 7k%fiiik Spider View 14;51, March 06 (4000 usft/in) CD5 Alpine West Pad --- CD5-316PB1wp07 -------CD5-316wp03. Fasting (4000 usft/in) 4 CD5-315PB1 CD5-315 CD4 -07 CD5-01 CD5-05 CD5-31\ \ CD5- CD2 -56L1 D % CD6.171mpw j Plan View CD5-316wp03.1 Plan View o� o Zy�e--------" -G 13000 ------ -- yon -- - ----- Gly, 6500 5 C C LO R 0- x 13-1/219� z Y-6500 o0 <n CD5-316PBIWPO7 9 5/8" x 12-1/4" 0000 o D 3 7" x 8-3/4 13000 20 0 21000 313 1$�1 22000 16wp03 1 2300 0 D5-3 240000 - -- 25000 -19500 26000 _ GD5 315 27000 4-1/2" x 6-1/8" 27824 --CD5-314XWP07 -26000 -19500 -13000 -6500 0 6500 13000 19500 26000 West(-)/East(+) (6500 usft/in) Section View CD5-316wp03.1 Section View -2500 20" x 42" 0 -"" 10-3/4" x 13-1/2" 00 Base Permafrost""-" 4000 ° C-30--- -30"C-10 C-1 0 O 2500 N --- hyo p_— K 3� 9 5/8" - x 12-1/4. --- ------ !��� D-� pp o� — -- K-2Qanni .o"--o—o------ — --- 5000 ---------- A Sub97� o 00 .(L o 0 7" x 8 3/4" 4-1/2" x 6-1/8" Albian 97 Albian 96 �'" �h o� O� 0 .�O O O 0 0' 0 0 0 0 O O O O 0 0 0 l v n iHRZ^ H -^ C> o ,'0 0 0 0° of ,' O N MO V U') ((00 ON � (� ----= _ Kalubik —N C\1 4LN— --- flL —N_ _LSI �_N— ' J m 7500 _ -- — ____ --=1 — ui LCU Kup C 10000 CD5-316 O1.Heel 041316 A CD5-316 02.Toe 041316 A 0 2500 5000 7500 10000 12500 15000 17500 20000 Vertical Section at 172.00° (2500 usft/in) Plan Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316 Plan: CD5-316wp03.1 Standard Proposal Report 02 March, 2017 Database: OAKEDMP2 Company: ConowPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-316 Wellbore: Plan: CD5-316 Design: CD5-316wp03.1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Basting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Gdtl Convergence: -1.15 ' Well Plan: CD5-316 Dogleg Build Turn Well Position +N/ -S 0.00 usft Northing: Latitude: Rate +E/ -W 0.00 usft Easting: Longitude: Position Uncertainty (°1100usft) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Welibo� Magnetics L -_ Plan Sections Measured Depth (usft) 36.80 400.00 600.09 1,287.35 1,393.86 2,445.83 2,465.83 2,884.83 17,025.57 18,789.18 18,809.18 18,926.20 27,823.65 Plan: CD5-316 Model Name BGGM2016 CD5-316wp03.1 Sample Date 4/15/2017 Phase: Depth From (TVD) (usft) 36.80 Vertical TVD Inclination Azimuth Depth System (°) (°) (usft) usft 0.00 0.00 36.80 -34.00 0.00 0.00 400.00 329.20 3.00 200.00 600.00 529.20 20.14 208.57 1,270.80 1,200.00 20.14 208.57 1,370.80 1,300.00 56.15 222.46 2,185.80 2,115.00 56.15 222.46 2,196.94 2,126.14 70.70 224.59 2,383.89 2,313.09 70.70 224.59 7,058.37 6,987.57 86.00 172.62 7,438.80 7,368.00 86.00 172.62 7,440.20 7,369.40 89.51 172.62 7,444.78 7,373.98 89.51 172.62 7,520.80 7,450.00 Declination Dip Angle 17.21 80.81 PLAN Tie On Depth: 36.80 +N/ -S +E/ -W Direction (usft) (usft) V) 0.00 0.00 172.00 Field Strength (nT) 57,505 31212017 3:25:0817M Page 2 COMPASS 5000.1 Build 74 Dogleg Build Turn +N/ -S +E/ -W Rate Rate Rate Tool Face (usft) (usft) (°I100usft) (°1100usft) (°1100usft) (°) 0.00 0.00 0 00 0.00 0.00 0.00 o.o0 0.00 0.00 0.00 0.00 0.00 -4.92 -1.79 1.50 1.50 0.00 200.00 -126.68 -65.01 2.50 2.49 1.25 10.00 -158.89 -82.55 0.00 0.00 0.00 0.00 -657.54 -477.77 3.50 3.42 1.32 19.44 -669.79 -488.99 0.00 0.00 0.00 0.00 -940.44 -746.66 3.50 3.47 0.51 7.96 -10,444.76 -10,115.65 0.00 0.00 0.00 0.00 -12,023.63 -10,623.52 3.00 0.87 -2.95 -80.09 -12,043.42 -10,620.95 0.00 0.00 0.00 0.00 -12,159.35 -10,605.93 3.00 3.00 0.00 -0.02 -20,982.75 -9,462.87 0.00 0.00 0.00 0.00 31212017 3:25:0817M Page 2 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore; Plan: CD5-316 Depth Inclination Design: CD5-316wp03.1 TVOss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVOss +N/ -S +El -W Northing Easting DLS Vert Section (usft) (o) (1) (usft) usft (usft) (usft) (usft) (usft) .34.00 36.80 0.00 0.00 36.80 -34.00 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 100.00 0.00 0.00 100.00 29.20 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 116.30 0.00 0.00 116.30 45.50 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 20" x 42" 200.00 0.00 0.00 200.00 129.20 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 300.00 0.00 0.00 300.00 229.20 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 400.00 0.00 0.00 400.00 329.20 0.00 0.00 5,965,580.48 1,489,283.58 0.00 0.00 KOP: Start 1.511100' DLS, 200° TF, for 200.09' 500.00 1.50 200.00 499.99 429.19 -1.23 -0.45 5,965,579.26 1,489,283.11 1.50 1.16 600.00 3.00 200.00 599.91 529.11 -4.92 -1.79 5,965,575.60 1,489,281.69 1.50 4.62 600.09 3.00 200.00 600.00 529.20 -4.92 -1.79 5,965,575.59 1,489,281.69 1.50 4.63 Start 2.5`1100' DLS, 10' TF, for 687.26' 700.00 5.48 204.55 699.63 628.83 -11.72 -4.67 5,965,568.86 1,489,278.68 2.50 10.96 800.00 7.97 206.26 798.93 728.13 -22.28 -9.72 5,965,558.40 1,489,273.41 2.50 20.71 900.00 10.47 207.17 897.63 826.83 -36.58 -16.94 5,965,544.25 1,489,265.91 2.50 33.87 1,000.00 12.96 207.72 995.54 924.74 -54.60 -26.30 5,965,526.43 1,489,256.19 2.50 50.40 1,100.00 15.46 208.10 1,092.47 1,021.67 -76.29 -37.80 5,965,504.98 1,489,244.25 2.50 70.28 1,200.00 17.96 208.38 1,188.24 1,117.44 -101.61 -51.41 5,965,479.93 1,489,230.14 2.50 93.47 1,287.35 20.14 208.57 1,270.80 1,200.00 -126.68 -65.01 5,965,455.15 1,489,216.04 2.50 116.40 Hold for 106.52' 1,300.00 20.14 208.57 1,282.68 1,211.88 -130.50 -67.09 5,965,451.36 1,489,213.88 0.00 119.90 1,340.61 20.14 208.57 1,320.80 1,250.00 -142.78 -73.78 5,965,439.22 1,489,206.95 0.00 131.13 Base Permafrost 1,393.86 20.14 208.57 1,370.80 1,300.00 -158.89 -82.55 5,965,423.29 1,489,197.86 0.00 145.86 Start 3.5°/100' DLS, 19.44° TF, for 1051.97' 1,400.00 20.35 208.77 1,376.56 1,305.76 -160.76 -83.56 5,965,421.45 1,489,196.80 3.50 147.56 1,500.00 23.68 211.64 1,469.26 1,398.46 -193.10 -102.47 5,965,389.50 1,489,177.25 3.50 176.96 1,600.00 27.05 213.84 1,559.61 1,488.81 -229.09 -125.68 5,965,353.98 1,489,153.33 3.50 209.37 1,700.00 30.45 215.58 1,647.27 1,576.47 -268.60 -153.09 5,965,315.04 1,489,125.13 3.50 244.68 1,800.00 33.87 217.00 1,731.92 1,661.12 -311.47 -184.61 5,965,272.81 1,489,092.75 3.50 282.74 1,900.00 37.30 218.19 1,813.24 1,742.44 -357.55 -220.12 5,965,227.46 1,489,056.32 3.50 323.43 2,000.00 40.74 219.20 1,890.92 1,820.12 406.66 -259.49 5,965,179.15 1,489,015.98 3.50 366.59 2,100.00 44.19 220.08 1,964.68 1,893.88 -458.63 -302.56 5,965,128.06 1,488,971.87 3.50 412.06 2,200.00 47.64 220.86 2,034.24 1,963.44 -513.26 -349.19 5,965,074.39 1,488,924.16 3.50 459.67 2,300.00 51.10 221.56 2,099.35 2,028.55 -570.34 -399.19 5,965,018.33 1,488,873.02 3.50 509.23 2,400.00 54.57 222.19 2,159.75 2,088.95 -629.66 -452.38 5,964,960.10 1,488,818.65 3.50 560.57 2,445.83 56.15 222.46 2,185.80 2,115.00 -657.54 -477.77 5,964,932.74 1,488,792.70 3.50 584.65 Hold for 20'. 110-3/4" x 13.1/2" 2,465.83 56.15 222.46 2,196.94 2,126.14 -669.79 -488.99 5,964,920.72 1488,781.25 0.00 595.22 Start 3.5°1100' DLS, 7.95° TF, for 419.01' 2,500.00 57.34 222.66 2,215.67 2,144.87 -690.84 -508.31 5,964,900.06 1,488,761.50 3.50 613.37 2,600.00 60.81 223.21 2,267.06 2,196.26 -753.63 -566.74 5,964,838.47 1,488,701.83 3.50 667.42 2,658.76 62.85 223.51 2,294.80 2,224.00 -791.29 -602.30 5,964,801.53 1,488,665.52 3.50 699.76 C30 2,700.00 64.28 223.72 2,313.16 2,242.36 -818.02 -627.77 5,964,775.32 1,488,639.52 3.50 722.69 322017 3:25:08PM Page 3 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Coordinate Reference: Well Plan: CD5-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: C135-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: C135-316 Map Design: CD5-316wp03.1 Depth Inclination Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/S +E/ -W Northing Easting OLS Vert Section (usft) (1) 0 (usft) usft (usft) (usft) (usft) (usft) 2,283.01 2,800.00 67.75 224.20 2,353.81 2,283.01 -883.78 -691.18 5,964,710.86 1,488,574.80 3.50 778.98 2,884.83 70.70 224.59 2,383.89 2,313.09 -940.44 -746.66 5,964,655.33 1,488,518.19 3.50 827.37 2,884.84 70.70 224.59 2,383.90 2,313.10 -940.45 -746.67 5,964,655.32 1,488,518.19 0.01 827.38 Hold for 14141.13' 2,900.00 70.70 224.59 2,388.91 2,318.11 -950.64 -756.72 5,964,645.33 1,488,507.94 0.00 836.07 3,000.00 70.70 224.59 2,421.97 2,351.17 -1,017.85 -822.97 5,964,579.47 1,488,440.35 0.00 893.41 3,100.00 70.70 224.59 2,455.02 2,384.22 -1,085.06 -889.23 5,964,513.61 1,488,372.76 0.00 950.75 3,200.00 70.70 224.59 2,488.08 2,417.28 -1,152.28 -955.48 5,964,447.75 1,488,305.17 0.00 1,008.09 3,300.00 70.70 224.59 2,521.14 2,450.34 -1,219.49 -1,021.74 5,964,381.89 1,488,237.58 0.00 1,065.42 3,400.00 70.70 224.59 2,554.19 2,483.39 -1,286.70 -1,087.99 5,964,316.03 1,488,169.99 0.00 1,122.76 3,500.00 70.70 224.59 2,587.25 2,516.45 -1,353.91 -1,154.25 5,964,250.17 1,488,102.40 0.00 1,180.10 3,600.00 70.70 224.59 2,620.31 2,549.51 -1,421.13 -1,220.50 5,964, 1 B4.31 1,488,034.81 0.00 1,237.43 3,700.00 70.70 224.59 2,653.36 2,582.56 -1,488.34 -1,286.76 5,964,118.45 1,487,967.22 0.00 1,294.77 3,800.00 70.70 224.59 2,686.42 2,615.62 -1,555.55 -1,353.01 5,964,052.59 1,487,899.63 0.00 1,352.11 3,900.00 70.70 224.59 2,719.48 2,648.68 -1,622.76 -1,419.27 5,963,986.73 1,487,832.04 0.00 1,409.45 4,000.00 70.70 224.59 2,752.53 2,681.73 -1,689.98 -1,485.52 5,963,920.87 1,487,764.45 0.00 1,466.78 4,100.00 70.70 224.59 2,785.59 2,714.79 -1,757.19 -1,551.78 5,963,855.01 1,487,696.86 0.00 1,524.12 4,200.00 70.70 224.59 2,818.65 2,747.85 -1,824.40 -1,618.03 5,963,789.15 1,487,629.27 0.00 1,581.46 4,215.59 70.70 224.59 2,823.80 2,753.00 -1,834.88 -1,628.36 5,963,778.89 1,487,618.74 0.00 1,590.40 C-10 4,300.00 70.70 224.59 2,851.70 2,780.90 -1,891.61 -1,684.29 5,963,723.29 1,487,561.68 0.00 1,638.80 4,400.00 70.70 224.59 2,884.76 2,813.96 -1,958.82 -1,750.55 5,963,657.43 1,487,494.09 0.00 1,696.13 4,500.00 70.70 224.59 2,917.82 2,847.02 -2,026.04 -1,816.80 5,963,591.57 1,487,426.50 0.00 1,753.47 4,600.00 70.70 224.59 2,950.87 2,880.07 -2,093.25 -1,883.06 5,963,525.71 1,487,358.91 0.00 1,810.81 4,700.00 70.70 224.59 2,983.93 2,913.13 -2,160.46 -1,949.31 5,963,459.85 1,487,291.32 0.00 1,868.14 4,800.00 70.70 224.59 3,016.99 2,946.19 -2,227.67 -2,015.57 5,963,393.99 1,487,223.73 0.00 1,925.48 4,900.00 70.70 224.59 3,050.04 2,979.24 -2,294.89 -2,081.82 5,963,328.13 1,487,156.14 0.00 1,982.82 5,000.00 70.70 224.59 3,083.10 3,012.30 -2,362.10 -2,148.08 5,963,262.27 1,487,088.55 0.00 2,040.16 5,100.00 70.70 224.59 3,116.16 3,045.36 -2,429.31 -2,214.33 5,963,196.41 1,487,020.96 0.00 2,097.49 5,200.00 70.70 224.59 3,149.21 3,078.41 -2,496.52 -2,280.59 5,963,130.55 1,486,953.37 0.00 2,154.83 5,300.00 70.70 224.59 3,182.27 3,111.47 -2,563.73 -2,346.84 5,963,064.69 1,486,885.79 0.00 2,212.17 5,400.00 70.70 224.59 3,215.33 3,144.53 -2,630.95 -2,413.10 5,962,998.83 1,486,818.20 0.00 2,269.50 5,500.00 70.70 224.59 3,248.39 3,177.59 -2,698.16 -2,479.35 5,962,932.97 1,486,750.61 0.00 2,326.84 5,600.00 70.70 224.59 3,281.44 3,210.64 -2,765.37 -2,545.61 5,962,867.11 1,486,683.02 0.00 2,384.18 5,700.00 70.70 224.59 3,314.50 3,243.70 -2,832.58 -2,611.86 5,962,801.25 1,486,615.43 0.00 2,441.52 5,800.00 70.70 224.59 3,347.56 3,276.76 -2,899.80 -2,678.12 5,962,735.39 1,486,547.84 0.00 2,498.85 5,900.00 70.70 224.59 3,380.61 3,309.81 -2,967.01 -2,744.37 5,962,669.53 1,486,480.25 0.00 2,556.19 6,000.00 70.70 224.59 3,413.67 3,342.87 -3,034.22 -2,810.63 5,962,603.67 1,486,412.66 0.00 2,613.53 6,100.00 70.70 224.59 3,446.73 3,375.93 -3,101.43 -2,876.89 5,962,537.81 1,486,345.07 0.00 2,670.87 6,200.00 70.70 224.59 3,479.78 3,408.98 -3,168.65 -2,943.14 5,962,471.95 1,486,277.48 0.00 2,728.20 6,300.00 70.70 224.59 3,512.84 3,442.04 -3,235.86 -3,009.40 5,962,406.09 1,486,209.89 0.00 2,785.54 6,400.00 70.70 224.59 3,545.90 3,475.10 -3,303.07 -3,075.65. 5,962,340.23 1,486,142.30 0.00 2,842.88 6,500.00 70.70 224.59 3,578.95 3,508.15 -3,370.28 -3,141.91 5,962,274.37 1,486,074.71 0.00 2,900.21 6,600.00 70.70 224.59 3,612.01 3,541.21 -3,437.49 -3,208.16 5,962,208.51 1,486,007.12 0.00 2,957.55 6,700.00 70.70 224.59 3,645.07 3,574.27 -3,504.71 -3,274.42 5,962,142.65 1,485,939.53 0.00 3,014.89 322017 3:25.08PM Page 4 COMPASS 5000.1 Build 74 Database: 0AKEOMP2 Local Co-ordinate Reference: Well Plan: CD5-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 +Nl-S Design: CD5-316wp03.1 Easting Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +Nl-S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 3,607.32 6,800.00 70.70 224.59 3,678.12 3,607.32 -3,571.92 -3,340.67 5,962,076.79 1,485,871.94 0.00 3,072.23 6,865.57 70.70 224.59 3,699.80 3,629.00 -3,615.99 -3,384.12 5,962,033.60 1,485,827.62 0.00 3,109.82 K-3 6,900.00 70.70 224.59 3,711.18 3,640.38 -3,639.13 -3,406.93 5,962,010.93 1,485,804.35 0.00 3,129.56 7,000.00 70.70 224.59 3,744.24 3,673.44 -3,706.34 -3,473.18 5,961,945.07 1,485,736.76 0.00 3,186.90 7,100.00 70.70 224.59 3,777.29 3,706.49 -3,773.56 -3,539.44 5,961,879.21 1,485,669.17 0.00 3,244.24 7,200.00 70.70 224.59 3,810.35 3,739.55 -3,840.77 -3,605.69 5,961,813.35 1,485,601.58 0.00 3,301.57 7,300.00 70.70 224.59 3,843.41 3,772.61 -3,907.98 -3,671.95 5,961,747.49 1,485,533.99 0.00 3,358.91 7,400.00 70.70 224.59 3,876.46 3,805.66 -3,975.19 -3,738.20 5,961,681.63 1,485,466.40 0.00 3,416.25 7,500.00 70.70 224.59 3,909.52 3,838.72 -4,042.40 -3,804.46 5,961,615.77 1,485,398.81 0.00 3,473.59 7,567.40 70.70 224.59 3,931.80 3,861.00 -4,087.70 -3,849.11 5,961,571.38 1,485,353.26 0.00 3,512.23 K-2 Qannik 7,600.00 70.70 224.59 3,942.58 3,871.78 -4,109.62 -3,870.71 5,961,549.91 1,485,331.22 0.00 3,530.92 7,700.00 70.70 224.59 3,975.63 3,904.83 -4,176.83 -3,936.97 5,961,484.05 1,485,263.63 0.00 3,588.26 7,800.00 70.70 224.59 4,008.69 3,937.89 -4,244.04 -4,003.22 5,961,418.19 1,485,196.04 0.00 3,645.60 7,900.00 70.70 224.59 4,041.75 3,970.95 -4,311.25 -4,069.48 5,961,352.33 1,485,128.45 0.00 3,702.93 8,000.00 70.70 224.59 4,074.80 4,004.00 -4,378.47 -4,135.74 5,961,286.47 1,485,060.86 0.00 3,760.27 8,100.00 70.70 224.59 4,107.86 4,037.06 -4,445.68 -4,201.99 5,961,220.61 1,484,993.27 0.00 3,817.61 8,200.00 70.70 224.59 4,140.92 4,070.12 4,512.89 4,268.25 5,961,154.75 1,484,925.68 0.00 3,874.95 8,300.00 70.70 224.59 4,173.97 4,103.17 -4,580.10 -4,334.50 5,961,088.89 1,484,858.09 0.00 3,932.28 8,400.00 70.70 224.59 4,207.03 4,136.23 -4,647.32 -4,400.76 5,961,023.03 1,484,790.50 0.00 3,989.62 8,500.00 70.70 224.59 4,240.09 4,169.29 -4,714.53 -4,467.01 5,960,957.17 1,484,722.91 0.00 4,046.96 8,577.78 70.70 224.59 4,265.80 4,195.00 -4,766.81 -4,518.55 5,960,905.94 1,484,670.34 0.00 4,091.56 Albian 97 8,600.00 70.70 224.59 4,273.14 4,202.34 -4,781.74 -4,533.27 5,960,891.31 1,484,655.32 0.00 4,104.30 8,700.00 70.70 224.59 4,306.20 4,235.40 -4,848.95 -4,599.52 5,960,825.45 1,484,587.73 0.00 4,161.63 8,800.00 70.70 224.59 4,339.26 4,268.46 -4,916.16 -4,665.78 5,960,759.59 1,484,520.14 0.00 4,218.97 8,843.99 70.70 224.59 4,353.80 4,283.00 4,945.73 4,694.92 5,960,730.61 1,484,490.41 0.00 4,244.19 ASub97 8,900.00 70.70 224.59 4,372.32 4,301.52 -4,983.38 -4,732.03 5,960,693.73 1,484,452.55 0.00 4,276.31 9,000.00 70.70 224.59 4,405.37 4,334.57 -5,050.59 -4,798.29 5,960,627.87 1,484,384.96 0.00 4,333.64 9,100.00 70.70 224.59 4,438.43 4,367.63 -5,117.80 4,864.54 5,960,562.01 1,484,317.37 0.00 4,390.98 9,200.00 70.70 224.59 4,471.49 4,400.69 -5,185.01 -4,930.80 5,960,496.14 1,484,249.79 0.00 4,448.32 9,300.00 70.70 224.59 4,504.54 4,433.74 -5,252.23 -4,997.05 5,960,430.28 1,484,182.20 0.00 4,505.66 9,400.00 70.70 224.59 4,537.60 4,466.80 -5,319.44 -5,063.31 5,960,364.42 1,484,114.61 0.00 4,562.99 9,500.00 70.70 224.59 4,570.66 4,499.86 -5,386.65 -5,129.56 5,960,298.56 1,484,047.02 0.00 4,620.33 9,600.00 70.70 224.59 4,603.71 4,532.91 -5,453.86 -5,195.82 5,960,232.70 1,483,979.43 0.00 4,677.67 9,700.00 70.70 224.59 4,636.77 4,565.97 -5,521.07 -5,262.07 5,960,166.84 1,483,911.84 0.00 4,735.00 9,800.00 70.70 224.59 4,669.83 4,599.03 -5,588.29 -5,328.33 5,960,100.98 1,483,844.25 0.00 4,792.34 9,900.00 70.70 224.59 4,702.88 4,632.08 -5,655.50 -5,394.59 5,960,035.12 1,483,776.66 0.00 4,849.68 10,000.00 70.70 224.59 4,735.94 4,665.14 -5,722.71 -5,460.84 5,959,969.26 1,483,709.07 0.00 4,907.02 10,100.00 70.70 224.59 4,769.00 4,698.20 -5,789.92 -5,527.10 5,959,903.40 1,483,641.48 0.00 4,964.35 10,200.00 70.70 224.59 4,802.05 4,731.25 -5,857.14 -5,593.35 5,959,837.54 1,483,573.89 0.00 5,021.69 10,300.00 70.70 224.59 4,835.11 4,764.31 -5,924.35 -5,659.61 5,959,771.68 1,483,506.30 0.00 5,079.03 10,400.00 70.70 224.59 4,868.17 4,797.37 -5,991.56 -5,725.86 5,959,705.82 1,483,438.71 0.00 5,136.37 3112017 3.25.08PM Page 5 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usR (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 Northing Easting Design: CD5-316wp031 Vert Section (usft) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/.W Northing Easting OLS Vert Section (usft) V) -6,663.68 (1) -6,388.41 (usft) usft (usft) (usft) (usft) (usft) 4,830.42 10,500.00 70.70 224.59 224.59 5,231.79 4,901.22 4,830.42 -6,058.77 -5,792.12 5,959,639.96 1,483,371.12 5,958,981.36 0.00 5,193.70 10,600.00 70.70 5,767.07 224.59 11,600.00 4,934.28 4,863.48 -6,125.99 -5,858.37 5,959,574.10 1,483,303.53 0.00 5,251.04 10,700.00 70.70 -6,520.92 224.59 4,967.34 4,896.54 -6,193.20 -5,924.63 5,959,508.24 1,483,235.94 0.00 5,308.38 10,800.00 70.70 5,297.90 224.59 5,227.10 5,000.39 4,929.59 -6,260.41 -5,990.88 5,959,442.38 1,483,168.35 1,482,560.04 0.00 5,365.71 10,900.00 70.70 11,800.00 224.59 70.70 5,033.45 4,962.65 -6,327.62 -6,057.14 5,959,376.52 1,483,100.76 0.00 5,423.05 11,000.00 70.70 224.59 5,066.51 4,995.71 -6,394.83 -6,123.39 5,959,310.66 1,483,033.17 0.00 5,480.39 11,100.00 70.70 5,293.22 224.59 -6,999.74 5,099.56 5,028.76 -6,462.05 -6,189.65 5,959,244.80 1,482,965.58 0.00 0.00 5,537.73 11,200.00 70.70 70.70 224.59 224.59 5,132.62 5,061.82 -6,529.26 -6,255.90 5,959,178.94 1,482,897.99 0.00 5,595.06 11,300.00 70.70 224.59 6,053.76 5,165.68 5,094.88 -6,596.47 -6,322.16 5,959,113.08 1,482,830.40 0.00 5,652.40 11,300.37 70.70 -7,134.17 224.59 -6,852.20 5,165.80 5,095.00 -6,596.72 -6,322.40 5,959,112.84 1,482,830.15 0.00 5,652.61 Albian 96 11,400.00 70.70 224.59 5,198.73 5,127.93 -6,663.68 -6,388.41 5,959,047.22 1,482,762.81 0.00 5,709.74 11,500.00 70.70 224.59 5,231.79 5,160.99 -6,730.90 -6,454.67 5,958,981.36 1,482,695.22 0.00 5,767.07 11,600.00 70.70 224.59 5,264.85 5,194.05 -6,798.11 -6,520.92 5,958,915.50 1,482,627.63 0.00 5,824.41 11,700.00 70.70 224.59 5,297.90 5,227.10 -6,865.32 -6,587.18 5,958,849.64 1,482,560.04 0.00 5,881.75 11,800.00 70.70 224.59 5,330.96 5,260.16 -6,932.53 -6,653.44 5,958,783.78 1,482,492.45 0.00 5,939.09 11,900.00 70.70 224.59 5,364.02 5,293.22 -6,999.74 -6,719.69 5,958,717.92 1,482,424.86 0.00 5,996.42 12,000.00 70.70 224.59 5,397.08 5,326.28 -7,066.96 -6,785.95 5,958,652.06 1,482,357.27 0.00 6,053.76 12,100.00 70.70 224.59 5,430.13 5,359.33 -7,134.17 -6,852.20 5,958,586.20 1,482,289.68 0.00 6,111.10 12,200.00 70.70 224.59 5,463.19 5,392.39 -7,201.38 -6,918.46 5,958,520.34 1,482,222.09 0.00 6,168.44 12,300.00 70.70 224.59 5,496.25 5,425.45 -7,268.59 -6,984.71 5,958,454.48 1,482,154.50 0.00 6,225.7 12,400.00 70.70 224.59 5,529.30 5,458.50 -7,335.81 -7,050.97 5,958,388.62 1,482,086.91 0.00 6,283.11 12,500.00 70.70 224.59 5,562.36 5,491.56 -7,403.02 -7,117.22 5,958,322.76 1,482,019.32 0.00 6,340.45 12,600.00 70.70 224.59 5,595.42 5,524.62 -7,470.23 -7,183.48 5,958,256.90 1,481,951.73 0.00 6,397.78 12,700.00 70.70 224.59 5,628.47 5,557.67 -7,537.44 -7,249.73 5,958,191.D4 1,481,884.14 0.00 6,455.12 12,800.00 70.70 224.59 5,661.53 5,590.73 -7,604.66 -7,315.99 5,958,125.18 1,481,816.55 0.00 6,512.46 12,900.00 70.70 224.59 5,694.59 5,623.79 -7,671.87 -7,382.24 5,958,059.32 1,481,748.95 0.00 6,569.80 13,000.00 70.70 224.59 5,727.64 5,656.84 -7,739.08 -7,448.50 5,957,993.46 1,481,681.37 0.00 6,627.13 13,100.00 70.70 224.59 5,760.70 5,689.90 -7,806.29 -7,514.75 5,957,927.60 1,481,613.79 0.00 6,684.47 13,200.00 70.70 224.59 5,793.76 5,722.96 -7,873.50 -7,581.01 5,957,861.74 1,481,546.20 0.00 6,741.81 13,300.00 70.70 224.59 5,826.81 5,756.01 -7,940.72 -7,647.26 5,957,795.88 1,481,478.61 0.00 6,799.14 13,400.00 70.70 224.59 5,859.87 5,789.07 -8,007.93 -7,713.52 5,957,730.02 1,481,411.02 0.00 6,856.48 13,500.00 70.70 224.59 5,892.93 5,822.13 -8,075.14 -7,779.77 5,957,664.16 1,481,343.43 0.00 6,913.82 13,600.00 70.70 224.59 5,925.98 5,855.18 -8,142.35 -7,846.03 5,957,598.30 1,481,275.84 0.00 6,971.16 13,700.00 70.70 224.59 5,959.04 5,888.24 -8,209.57 -7,912.29 5,957,532.44 1,481,208.25 0.00 7,028.49 13,800.00 70.70 224.59 5,992.10 5,921.30 -8,276.78 -7,978.54 5,957,466.58 1,481,140.66 0.00 7,085.83 13,900.00 70.70 224.59 6,025.15 5,954.35 -8,343.99 -8,044.80 5,957,400.72 1,481,073.07 0.00 7,143.17 13,950.26 70.70 224.59 6,041.77 5,970.97 -8,377.77 -8,078.10 5,957,367.62 1,481,039.10 0.00 7,171.99 9 6/8" x 12-114" 14,000.00 70.70 224.59 6,058.21 5,987.41 -8,411.20 -8,111.05 5,957,334.86 1,481,005.48 0.00 7,200.51 14,100.00 70.70 224.59 6,091.27 6,020.47 -8,478.41 -8,177.31 5,957,269.00 1,480,937.89 0.00 7,257.84 14,200.00 70.70 224.59 6,124.32 6,053.52 -8,545.63 -8,243.56 5,957,203.14 1,480,870.30 0.00 7,315.18 14,300.00 70.70 224.59 6,157.38 6,086.58 -8,612.84 -8,309.82 5,957,137.28 1,480,802.71 0.00 7,372.52 14,400.00 70.70 224.59 6,190.44 6,119.64 -8,680.05 -8,376.07 5,957,071.42 1,480,735.12 0.00 7,429.85 14,500.00 70.70 224.59 6,223.49 6,152.69 -8,747.26 -8,442.33 5,957,005.56 1,480,667.53 0.00 7,487.19 31212017 3:25:08PM Page 6 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Coordinate Reference: Well Plan: CD5-316 Company: ConomPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usit (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 Depth Inclination Design: CD5-316wp03.1 TVDss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 6,185.75 14,600.00 70.70 224.59 6,256.55 6,185.75 -8,814.48 -8,508.58 5,956,939.70 1,480,599.94 0.00 7,544.53 14,700.00 70.70 224.59 6,289.61 6,218.81 -8,881.69 -8,574.84 5,956,873.84 1,480,532.35 0.00 7,601.87 14,800.00 70.70 224.59 6,322.66 6,251.86 -8,948.90 -8,641.09 5,956,807.98 1,480,464.76 0.00 7,659.20 14,900.00 70.70 224.59 6,355.72 6,284.92 -9,016.11 -8,707.35 5,956,742.12 1,480,397.17 0.00 7,716.54 15,000.00 70.70 224.59 6,388.78 6,317.98 -9,083.33 -8,773.60 5,956,676.26 1,480,329.58 0.00 7,773.88 15,100.00 70.70 224.59 6,421.83 6,351.03 -9,150.54 -8,839.86 5,956,610.40 1,480,261.99 0.00 7,831.21 15,200.00 70.70 224.59 6,454.89 6,384.09 -9,217.75 -8,906.11 5,956,544.54 1,480,194.40 0.00 7,888.55 15,300.00 70.70 224.59 6,487.95 6,417.15 -9,284.96 -8,972.37 5,956,478.68 1,480,126.81 0.00 7,945.89 15,400.00 70.70 224.59 6,521.01 6,450.21 -9,352.17 -9,038.63 5,956,412.82 1,480,059.22 0.00 8,003.23 15,500.00 70.70 224.59 6,554.06 6,483.26 -9,419.39 -9,104.88 5,956,346.96 1,479,991.63 0.00 8,060.56 15,600.00 70.70 224.59 6,587.12 6,516.32 -9,486.60 -9,171.14 5,956,281.10 1,479,924.04 0.00 8,117.90 15,700.00 70.70 224.59 6,620.18 6,549.38 -9,553.81 -9,237.39 5,956,215.24 1,479,856.45 0.00 8,175.24 15,800.00 70.70 224.59 6,653.23 6,582.43 -9,621.02 -9,303.65 5,956,149.38 1,479,788.86 0.00 8,232.57 15,900.00 70.70 224.59 6,686.29 6,615.49 -9,688.24 -9,369.90 5,956,083.52 1,479,721.27 0.00 8,289.91 16,000.00 70.70 224.59 6,719.35 6,648.55 -9,755.45 -9,436.16 5,956,017.66 1,479,653.68 0.00 8,347.25 16,100.00 70.70 224.59 6,752.40 6,681.60 -9,822.66 -9,502.41 5,955,951.80 1,479,586.09 0.00 8,404.59 16,200.00 70.70 224.59 6,785.46 6,714.66 -9,889.87 -9,568.67 5,955,885.94 1,479,518.50 0.00 8,461.92 16,300.00 70.70 224.59 6,818.52 6,747.72 -9,957.08 -9,634.92 5,955,820.08 1,479,450.91 0.00 8,519.26 16,400.00 70.70 224.59 6,851.57 6,780.77 -10,024.30 -9,701.18 5,955,754.22 1,479,383.32 0.00 8,576.60 16,500.00 70.70 224.59 6,884.63 6,813.83 -10,091.51 -9,767.43 5,955,688.35 1,479,315.73 0.00 8,633.94 16,600.00 70.70 224.59 6,917.69 6,846.89 -10,158.72 -9,833.69 5,955,622.49 1,479,248.14 0.00 8,691.27 16,700.00 70.70 224.59 6,950.74 6,879.94 -10,225.93 -9,899.94 5,955,556.63 1,479,180.55 0.00 8,748.61 16,800.00 70.70 224.59 6,983.80 6,913.00 -10,293.15 -9,966.20 5,955,490.77 1,479,112.96 0.00 8,805.95 16,900.00 70.70 224.59 7,016.86 6,946.06 -10,360.36 -10,032.45 5,955,424.91 1,479,045.37 0.00 8,863.28 16,972.43 70.70 224.59 7,040.80 6,970.00 -10,409.04 -10,080.44 5,955,377.21 1,478,996.42 0.00 8,904.81 HRZ 17,000.00 70.70 224.59 7,049.91 6,979.11 -10,427.57 -10,098.71 5,955,359.05 1,478,977.79 0.00 8,920.62 17,025.57 70.70 224.59 7,058.37 6,987.57 -10,444.76 -10,115.65 5,955,342.21 1,478,960.50 0.00 8,935.28 17,025.97 70.70 224.58 7,058.50 6,987.70 -10,445.03 -10,115.92 5,955,341.95 1,478,960.23 3.00 8,935.51 Start 3°/100' DLS, 50.09° TP, for 1763.6' 17,100.00 71.10 222.26 7,082.73 7,011.93 -10,495.83 -10,163.99 5,955,292.13 1,478,911.15 3.00 8,979.13 17,200.00 71.68 219.16 7,114.65 7,043.85 -10,567.66 -10,225.79 5,955,221.56 1,478,847.92 3.00 9,041.66 17,300.00 72.31 216.07 7,145.57 7,074.77 -10,642.98 -10,283.83 5,955,147.43 1,478,788.38 3.00 9,108.17 17,400.00 72.99 213.01 7,175.40 7,104.60 -10,721.59 -10,337.94 5,955,069.93 1,478,732.70 3.00 9,178.49 17,500.00 73.71 209.97 7,204.06 7,133.26 -10,803.28 -10,387.98 5,954,989.27 1,478,681.03 3.00 9,252.41 17,600.00 74.48 206.96 7,231.47 7,160.67 -10,887.81 -10,433.81 5,954,905.68 1,478,633.52 3.00 9,329.75 17,700.00 75.29 203.97 7,257.56 7,186.76 -10,974.97 -10,475.30 5,954,819.39 1,478,590.28 3.00 9,410.28 17,800.00 76.13 201.00 7,282.25 7,211.45 -11,064.50 -10,512.35 5,954,730.63 1,478,551.44 3.00 9,493.78 17,900.00 77.01 198.05 7,305.47 7,234.67 -11,156.16 -10,544.84 5,954,639.64 1,478,517.11 3.00 9,580.03 17,969.90 77.65 196.00 7,320.80 7,250.00 -11,221.37 -10,564.81 5,954,574.85 1,478,495.84 3.00 9,641.83 Kalubik 18,000.00 77.93 195.12 7,327.17 7,256.37 -11,249.71 -10,572.70 5,954,546.68 1,478,487.38 3.00 9,668.79 18,100.00 78.87 192.21 7,347.27 7,276.47 -11,344.88 -10,595.84 5,954,452.00 1,478,462.33 3.00 9,759.82 18,200.00 79.85 189.33 7,365.74 7,294.94 -11,441.42 -10,614.20 5,954,355.86 1,478,442.04 3.00 9,852.86 18,300.00 80.84 186.46 7,382.51 7,311.71 -11,539.06 -10,627.73 5,954,258.52 1,478,426.54 3.00 9,947.67 3/212017 3.25:08PM Page 7 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-316 Company: ConowPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 Depth Inclination Azimuth Design: CD5-316wp03.1 TVDss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) V) (°) (usft) usft (usft) (usft) (usft) (usft) 7,326.75 18,400.00 81.87 183.60 7,397.55 7,326.75 -11,637.53 -10,636.39 5,954,160.25 1,478,415.90 3.00 10,043.98 18,500.00 82.91 180.76 7,410.80 7,340.00 -11,736.57 -10,640.16 5,954,061.32 1,478,410.14 3.00 10,141.52 18,600.00 83.96 177.94 7,422.24 7,351.44 -11,835.89 -10,639.03 5,953,962.00 1,478,409.26 3.00 10,240.04 18,700.00 85.03 175.12 7,431.83 7,361.03 -11,935.24 -10,633.01 5,953,862.56 1,478,413.29 3.00 10,339.26 18,748.43 85.56 173.76 7,435.80 7,365.00 -11,983.27 -10,628.33 5,953,814.44 1,478,417.00 3.00 10,387.47 Kup C 18,782.73 85.93 172.80 7,438.35 7,367.55 -12,017.24 -10,624.33 5,953,780.40 1,478,420.31 3.00 10,421.67 CD"14X O1.Heel 022316 DK 18,789.18 86.00 172.62 7,438.80 7,368.00 -12,023.63 -10,623.52 5,953,774.00 1,478,421.00 3.00 10,428.11 CD5-316 01.Heel 041316 NA 18,789.57 86.00 172.62 7,438.83 7,368.03 -12,024.01 -10,623.47 5,953,773.61 1,478,421.04 0.00 10,428.50 Hold for 20'- 7" x 8-3/4" 18,800.00 86.00 172.62 7,439.55 7,368.75 -12,034.33 -10,622.13 5,953,763.27 1,478,422.17 0.00 10,438.90 18,809.18 86.00 172.62 7,440.20 7,369.40 -12,043.42 -10,620.95 5,953,754.17 1,478,423.16 0.00 10,448.06 18,809.57 86.01 172.62 7,440.22 7,369.42 -12,043.80 -10,620.90 5,953,753.78 1,478,423.21 3.00 10,448.44 Start 3'/100' OILS, -0.02° TF, for 117.01' 18,854.07 87.35 172.62 7,442.80 7,372.00 -12,087.86 -10,615.20 5,953,709.62 1,478,428.02 3.00 10,492.87 LCU 18,900.00 88.72 172.62 7,444.37 7,373.57 -12,133.38 -10,609.30 5,953,664.00 1,478,433.00 3.00 10,538.77 18,926.20 89.51 172.62 7,444.78 7,373.98 -12,159.35 -10,605.93 5,953,637.96 1,478,435.84 3.00 10,564.96 18,926.58 89.51 172.62 7,444.78 7,373.98 -12,159.74 -10,605.88 5,953,637.58 1,478,435.89 0.00 10,565.34 Hold for 8897.45' 19,000.00 89.51 172.62 7,445.41 7,374.61 -12,232.54 -10,596.45 5,953,564.60 1,478,443.85 0.00 10,638.76 19,100.00 89.51 172.62 7,446.26 7,375.46 -12,331.71 -10,583.61 5,953,465.20 1,478,454.70 0.00 10,738.75 19,200.00 89.51 172.62 7,447.12 7,376.32 -12,430.88 -10,570.76 5,953,365.80 1,478,465.55 0.00 10,838.74 19,300.00 89.51 172.62 7,447.97 7,377.17 -12,530.05 -10,557.91 5,953,266.40 1,478,476.39 0.00 10,938.73 19,400.00 89.51 172.62 7,448.83 7,378.03 -12,629.21 -10,545.06 5,953,167.00 1,478,487.24 0.00 11,038.72 19,500.00 89.51 172.62 7,449.68 7,378.88 -12,728.38 -10,532.22 5,953,067.61 1,478,498.09 0.00 11,138.71 19,600.00 89.51 172.62 7,450.53 7,379.73 -12,827.55 -10,519.37 5,952,968.21 1,478,508.94 0.00 11,238.70 19,700.00 89.51 172.62 7,451.39 7,380.59 -12,926.72 -10,506.52 5,952,868.81 1,478,519.78 0.00 11,338.69 19,800.00 89.51 172.62 7,452.24 7,381.44 -13,025.88 -10,493.68 5,952,769.41 1,478,530.63 0.00 11,438.68 19,900.00 89.51 172.62 7,453.10 7,382.30 -13,125.05 -10,480.83 5,952,670.01 1,478,541.48 0.00 11,538.67 20,000.00 89.51 172.62 7,453.95 7,383.15 -13,224.22 -10,467.98 5,952,570.61 1,478,552.33 0.00 11,638.66 20,100.00 89.51 172.62 7,454.81 7,384.01 -13,323.39 -10,455.13 5,952,471.21 1,478,563.17 D.DO 11,738.65 20,200.00 89.51 172.62 7,455.66 7,384.86 -13,422.55 -10,442.29 5,952,371.81 1,478,574.02 0.00 11,838.64 20,300.00 89.51 172.62 7,456.52 7,385.72 -13,521.72 -10,429.44 5,952,272.42 1,478,584.87 0.00 11,938.63 20,400.00 89.51 172.62 7,457.37 7,386.57 -13,620.89 -10,416.59 5,952,173.02 1,478,595.72 0.00 12,038.62 20,500.00 89.51 172.62 7,458.22 7,387.42 -13,720.06 -10,403.75 5,952,073.62 1,478,606.56 0.00 12,138.61 20,600.00 89.51 172.62 7,459.08 7,388.28 -13,819.23 -10,390.90 5,951,974.22 1,478,617.41 0.00 12,238.60 20,700.00 89.51 172.62 7,459.93 7,389.13 -13,918.39 -10,378.05 5,951,874.82 1,478,628.26 0.00 12,338.59 20,800.00 89.51 172.62 7,460.79 7,389.99 -14,017.56 -10,365.21 5,951,775.42 1,478,639.11 0.00 12,438.58 20,900.00 89.51 172.62 7,461.64 7,390.84 -14,116.73 -10,352.36 5,951,676.02 1,478,649.95 0.00 12,538.58 21,000.00 89.51 172.62 7,462.50 7,391.70 -14,215.90 -10,339.51 5,951,576.62 1,478,660.80 0.00 12,638.57 21,100.00 89.51 172.62 7,463.35 7,392.55 -14,315.06 -10,326.66 5,951,477.23 1,478,671.65 0.00 12,738.56 21,200.00 89.51 172.62 7,464.21 7,393.41 -14,414.23 -10,313.82 5,951,377.83 1,478,682.50 0.00 12,838.55 322017 3.25:08PM Page 8 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: CD5-316 Company: ConowPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 Depth Inclination Design: CD5-316wp03.1 TVDss +NIS Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NIS +El -W Northing Easting DLS Vert Section (usft) (0) (0) (usft) usft (usft) (usft) (usft) (usft) 7,393.89 21,257.20 89.51 172.62 7,464.69 7,393.89 -14,470.95 -10,306.47 5,951,320.97 1,478,688.70 0.00 12,895.74 CDS-316 01.Heel 012617 DK 21,300.00 89.51 172.62 7,465.06 7,394.26 -14,513.40 -10,300.97 5,951,278.43 1,478,693.34 0.00 12,938.54 21,400.00 89.51 172.62 7,465.91 7,395.11 -14,612.57 -10,288.12 5,951,179.03 1,478,704.19 0.00 13,038.53 21,500.00 89.51 172.62 7,466.77 7,395.97 -14,711.73 -10,275.28 5,951,079.63 1,478,715.04 0.00 13,138.52 21,600.00 89.51 172.62 7,467.62 7,396.82 -14,810.90 -10,262.43 5,950,980.23 1,478,725.89 0.00 13,238.51 21,700.00 89.51 172.62 7,468.48 7,397.68 -14,910.07 -10,249.58 5,950,880.83 1,478,736.73 0.00 13,338.50 21,800.00 89.51 172.62 7,469.33 7,398.53 -15,009.24 -10,236.73 5,950,781.43 1,478,747.58 0.00 13,438.49 21,900.00 89.51 172.62 7,470.19 7,399.39 -15,108.40 -10,223.89 5,950,682.03 1,478,758.43 0.00 13,538.48 22,000.00 89.51 172.62 7,471.04 7,400.24 -15,207.57 -10,211.04 5,950,582.64 1,478,769.28 0.00 13,638.47 22,100.00 89.51 172.62 7,471.90 7,401.10 -15,306.74 -10,198.19 5,950,483.24 1,478,780.12 0.00 13,738.46 22,200.00 89.51 172.62 7,472.75 7,401.95 -15,405.91 -10,185.35 5,950,383.84 1,478,790.97 0.00 13,838.45 22,300.00 89.51 172.62 7,473.60 7,402.80 -15,505.08 -10,172.50 5,950,284.44 1,478,801.82 0.00 13,938.44 22,400.00 89.51 172.62 7,474.46 7,403.66 -15,604.24 -10,159.65 5,950,185.04 1,478,812.67 0.00 14,038.43 22,500.00 89.51 172.62 7,475.31 7,404.51 -15,703.41 -10,146.80 5,950,085.64 1,478,823.51 0.00 14,138.42 22,600.00 89.51 172.62 7,476.17 7,405.37 -15,802.58 -10,133.96 5,949,986.24 1,478,834.36 0.00 14,238.41 22,700.00 89.51 172.62 7,477.02 7,406.22 -15,901.75 -10,121.11 5,949,886.84 1,478,845.21 0.00 14,338.40 22,800.00 89.51 172.62 7,477.88 7,407.08 -16,000.91 -10,108.26 5,949,787.45 1,478,856.06 0.00 14,438.40 22,900.00 89.51 172.62 7,478.73 7,407.93 -16,100.08 -10,095.42 5,949,688.05 1,478,866.90 0.00 14,538.39 23,000.00 89.51 172.62 7,479.59 7,408.79 -16,199.25 -10,082.57 5,949,588.65 1,478,877.75 0.00 14,638.38 23,100.00 89.51 172.62 7,480.44 7,409.64 -16,298.42 -10,069.72 5,949,489.25 1,478,888.60 0.00 14,738.37 23,200.00 89.51 172.62 7,481.29 7,410.49 -16,397.58 -10,056.88 5,949,389.85 1,478,899.45 0.00 14,838.36 23,300.00 89.51 172.62 7,482.15 7,411.35 -16,496.75 -10,044.03 5,949,290.45 1,478,910.29 0.00 14,938.35 23,400.00 89.51 172.62 7,483.00 7,412.20 -16,595.92 -10,031.18 5,949,191.05 1,478,921.14 0.00 15,038.34 23,500.00 89.51 172.62 7,483.86 7,413.06 -16,695.09 -10,018.33 5,949,091.65 1,478,931.99 0.00 15,138.33 23,600.00 89.51 172.62 7,484.71 7,413.91 -16,794.25 -10,005.49 5,948,992.26 1,478,942.84 0.00 15,238.32 23,700.00 89.51 172.62 7,485.57 7,414.77 -16,893.42 -9,992.64 5,948,892.86 1,478,953.69 0.00 15,338.31 23,800.00 89.51 172.62 7,486.42 7,415.62 -16,992.59 -9,979.79 5,948,793.46 1,478,964.53 0.00 15,438.30 23,900.00 89.51 172.62 7,487.28 7,416.48 -17,091.76 -9,966.95 5,948,694.06 1,478,975.38 0.00 15,538.29 24,000.00 89.51 172.62 7,488.13 7,417.33 -17,190.93 -9,954.10 5,948,594.66 1,478,986.23 0.00 15,638.28 24,100.00 89.51 172.62 7,488.98 7,418.18 -17,290.09 -9,941.25 5,948,495.26 1,478,997.08 0.00 15,738.27 24,200.00 89.51 172.62 7,489.84 7,419.04 -17,389.26 -9,928.40 5,948,395.86 1,479,007.92 0.00 15,838.26 24,300.00 89.51 172.62 7,490.69 7,419.89 -17,488.43 -9,915.56 5,948,296.46 1,479,018.77 0.00 15,938.25 24,400.00 89.51 172.62 7,491.55 7,420.75 -17,587.60 -9,902.71 5,948,197.06 1,479,029.62 0.00 16,038.24 24,500.00 89.51 172.62 7,492.40 7,421.60 -17,686.76 -9,889.86 5,948,097.67 1,479,040.47 0.00 16,138.23 24,600.00 89.51 172.62 7,493.26 7,422.46 -17,785.93 -9,877.02 5,947,998.27 1,479,051.31 0.00 16,238.22 24,700.00 89.51 172.62 7,494.11 7,423.31 -17,885.10 -9,864.17 5,947,898.87 1,479,062.16 0.00 16,338.22 24,800.00 89.51 172.62 7,494.97 7,424.17 -17,984.27 -9,851.32 5,947,799.47 1,479,073.01 0.00 16,438.21 24,900.00 89.51 172.62 7,495.82 7,425.02 -18,083.43 -9,838.47 5,947,700.07 1,479,083.86 0.00 16,538.20 25,000.00 89.51 172.62 7,496.67 7,425.87 -18,182.60 -9,825.63 5,947,600.67 1,479,094.70 0.00 16,638.19 25,100.00 89.51 172.62 7,497.53 7,426.73 -18,281.77 -9,812.78 5,947,501.27 1,479,105.55 0.00 16,738.18 25,200.00 89.51 172.62 7,498.38 7,427.58 -18,380.94 -9,799.93 5,947,401.87 1,479,116.40 0.00 16,838.17 25,300.00 89.51 172.62 7,499.24 7,428.44 -18,480.10 -9,787.09 5,947,302.48 1,479,127.25 0.00 16,938.16 25,400.00 89.51 172.62 7,500.09 7,429.29 -18,579.27 -9,774.24 5,947,203.08 1,479,138.09 0.00 17,038.15 25,500.00 89.51 172.62 7,500.95 7,430.15 -18,678.44 -9,761.39 5,947,103.68 1,479,148.94 0.00 17,138.14 312)2017 3:25.08PM Page 9 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Coordinate Reference: Well Plan: CD5-316 Company: Con000Phillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CDS-316 (usft) (1) Design: CD5-316wp03.I usft (usft) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (1) V) (usft) usft (usft) (usft) (usft) (usft) 7,431.00 25,600.00 89.51 172.62 7,501.80 7,431.00 -18,777.61 -9,748.54 5,947,004.28 1,479,159.79 0.00 17,238.13 25,700.00 89.51 172.62 7,502.65 7,431.85 -18,876.78 -9,735.70 5,946,904.88 1,479,170.64 0.00 17,338.12 25,800.00 89.51 172.62 7,503.51 7,432.71 -18,975.94 -9,722.85 5,946,805.48 1,479,181.48 0.00 17,438.11 25,900.00 89.51 172.62 7,504.36 7,433.56 -19,075.11 -9,710.00 5,946,706.08 1,479,192.33 0.00 17,538.10 26,000.00 89.51 172.62 7,505.22 7,434.42 -19,174.28 -9,697.16 5,946,606.68 1,479,203.18 0.00 17,638.09 26,100.00 89.51 172.62 7,506.07 7,435.27 -19,273.45 -9,684.31 5,946,507.29 1,479,214.03 0.00 17,738.08 26,200.00 89.51 172.62 7,506.93 7,436.13 -19,372.61 -9,671.46 5,946,407.89 1,479,224.87 0.00 17,838.07 26,300.00 89.51 172.62 7,507.78 7,436.98 -19,471.78 -9,658.62 5,946,308.49 1,479,235.72 0.00 17,938.06 26,400.00 89.51 172.62 7,508.64 7,437.84 -19,570.95 -9,645.77 5,946,209.09 1,479,246.57 0.00 18,038.05 26,500.00 89.51 172.62 7,509.49 7,438.69 -19,670.12 -9,632.92 5,946,109.69 1,479,257.42 0.00 18,138.04 26,600.00 89.51 172.62 7,510.34 7,439.54 -19,769.28 -9,620.07 5,946,010.29 1,479,268.26 0.00 18,238.04 26,700.00 89.51 172.62 7,511.20 7,440.40 -19,868.45 -9,607.23 5,945,910.89 1,479,279.11 0.00 18,338.03 26,800.00 89.51 172.62 7,512.05 7,441.25 -19,967.62 -9,594.38 5,945,811.49 1,479,289.96 0.00 18,438.02 26,900.00 89.51 172.62 7,512.91 7,442.11 -20,066.79 -9,581.53 5,945,712.10 1,479,300.81 0.00 18,538.01 27,000.00 89.51 172.62 7,513.76 7,442.96 -20,165.95 -9,568.69 5,945,612.70 1,479,311.65 0.00 18,638.00 27,100.00 89.51 172.62 7,514.62 7,443.82 -20,265.12 -9,555.84 5,945,513.30 1,479,322.50 0.00 18,737.99 27,200.00 89.51 172.62 7,515.47 7,444.67 -20,364.29 -9,542.99 5,945,413.90 1,479,333.35 0.00 18,837.98 27,300.00 89.51 172.62 7,516.33 7,445.53 -20,463.46 -9,530.14 5,945,314.50 1,479,344.20 0.00 18,937.97 27,400.00 89.51 172.62 7,517.18 7,446.38 -20,562.63 -9,517.30 5,945,215.10 1,479,355.04 0.00 19,037.96 27,500.00 89.51 172.62 7,518.03 7,447.23 -20,661.79 -9,504.45 5,945,115.70 1,479,365.89 0.00 19,137.95 27,600.00 89.51 172.62 7,518.89 7,448.09 -20,760.96 -9,491.60 5,945,016.30 1,479,376.74 0.00 19,237.94 27,700.00 89.51 172.62 7,519.74 7,448.94 -20,860.13 -9,478.76 5,944,916.90 1,479,387.59 0.00 19,337.93 27,800.00 89.51 172.62 7,520.60 7,449.80 -20,959.30 -9,465.91 5,944,817.51 1,479,398.43 0.00 19,437.92 27,822.84 89.51 172.62 7,520.79 7,449.99 -20,981.94 -9,462.98 5,944,794.81 1,479,400.91 0.00 19,460.75 CDS-314X 02.Toe 022316 DK 27,823.65 89.51 172.62 7,520.80 7,450.00 -20,982.75 -9,462.87 5,944,794.00 1,479,401.00 0.00 19,461.57 CDS-316 02.Toe 041316 NA - CDS-316 02.Toe 012617 DK 322017 3:25:08PM Page 10 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Company: ConocePhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-316 Wellbore: Plan: CD5-316 Design: CD5-316wp03.1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature Targets Vertical Vertical Dip Depth Depth Target Name (usft) (usft) Name Lithology 6,865.57 -hitimiss target Dip Angle Dip Dir. TVD +N/S +E/ -W Northing Eastin9 -Shape (°) V) (usft) (usft) (usft) (usft) (usft) CD5-314X O1.14eel 022316 DK 0.00 0.00 7,351.80 -12,023.52 -10,623.01 5,953,774.10 1,478,421.51 - plan misses target center by 86.78usft at 18783.01 usft MD (7438.37 TVD, -12017.53 N, -10624.30 E) Kalubik 8,577.78 4,265.80 - Circle (radius 100.00) 18,854.07 7,442.80 LCU 7,567.40 CD5-31601.Heel 041316 NA 0.00 0.00 7,438.80 -12,023.63 -10,623.52 5,953,774.00 1,478,421.00 - plan hits target center 4,353.80 ASub97 18,748.43 7,435.80 - Circle (radius 1,320.00) C05-31602.7ce 041316 NA 0.00 0.00 7,520.80 -20,982.75 -9,462.87 5,944,794.00 1,479,401.00 - plan hits target center - Circle (radius 1,320.00) CD5-314X 02. Toe 022316 DK 0.00 0.00 7,430.80 -20,982.64 -9,462.36 5,944,794.10 1,479,401.51 - plan misses target center by 90.00usft at 27822.84usft MD (7520.79 TVD, -20981.94 N, -9462.98 E) - Circle (radius 100.00) CD5-316 01.Heel 012617 DK 0.00 0.00 7,430.80 -14,199.65 -8,210.05 5,951,550.00 1,480,790.00 - plan misses target center by 2114.17usft at 21257.20usft MD (7464.69 TVD, -14470.95 N, -10306.47 E) - Circle (radius 100.00) CD5-316 02.Toe 012617 DK 0.00 0.00 7,460.80 -21,250.37 -7,502.94 5,944,487.00 1,481,355.00 - plan misses target center by 1979.03usft at 27823.65usft MD (7520.80 TVD, -20982.75 N, .9462 87 E) - Circle (radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 116.30 116.30 20" x 42" 20 42 2,445.83 2,185.80 10-3/4"x 13-1/2" 10-3/4 13-1/2 13,950.26 6,041.77 9 5/8" x 12-1/4" 9-5/8 12-1/4 18,789.57 7,438.83 7" x 8-3/4" 7 8-3/4 27,824.03 7,520.80 4-1/2'x6-1/8" 4-1/2 6-1/8 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology 6,865.57 3,699.80 K-3 1,340.61 1,320.80 Base Permafrost 16,972.43 7,040.80 HRZ 4,215.59 2,823.80 C-10 2,658.76 2,294.80 C-30 17,969.90 7,320.80 Kalubik 8,577.78 4,265.80 Albian 97 18,854.07 7,442.80 LCU 7,567.40 3,931.80 K-2 Qannik 11,300.37 5,165.80 Albian 96 8,843.99 4,353.80 ASub97 18,748.43 7,435.80 Kup C 31212017 3.25:08PM Page 11 COMPASS 5000.1 Build 74 Database: OAKEDMP2 Local Co-ordinate Reference: Well Plan: C135-316 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Project: Western North Slope MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-316 0.00 KOP: Start 1.5°/100' DLS, 200° TF, for 200.09 Design: CD5-316wp03.1 4.92 -1.79 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W - (usft) (usft) (usft) (usft) Comment 400.00 400.00 0.00 0.00 KOP: Start 1.5°/100' DLS, 200° TF, for 200.09 600.09 600.00 4.92 -1.79 Start 2.5°/100' DLS, 10' TF, for 687.26' 1,287.35 1,270.80 -126.68 -65.01 Hold for 106.52' - 1,393.86 1,370.80 -158.89 -82.55 Start 3.5°/100' DLS, 19.44° TF, for 1051.97' 2,445.83 2,185.80 -657.54 -477.77 Hold for 20' 2,465.83 2,196.94 -669.79 -488.99 Start 3.5°/100' DLS, 7.95° TF, for 419.01' 2,884.84 2,383.90 -940.45 -746.67 Hold for 14141.13' 17,025.97 7,058.50 -10,445.03 -10,115.92 Start 3°/100' DLS, -80.09° TF, for 1763.6' 18,789.57 7,438.83 -12,024.01 -10,623.47 Hold for 20' 18,809.57 7,440.22 -12,043.80 -10,620.90 Start 3°/100' DLS, -0.02° TF, for 117.01' 18,926.58 7,444.78 -12,159.74 -10,605.88 Hold for 8897.45' 27,824.03 TD: 27824.03' MD, 7520.8' TVD 3/212017 3.25.08PM Page 12 COMPASS 5000.1 Build 74 AC Summary ConocoPhill ips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316 50103xxxxx00 CD5-316wp03.1 Clearance Summary Anticollision Report 06 March, 2017 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan :CD5-316-Plan: CD5-316 - CD5-316wp03.1 Well Coordinates: 5,965,580.48 N, 1,489,283.58 E (70" 18'48.30" N, 151° 13' 29.76" W) Datum Height: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Scan Range: 0.00 to 27,824.03 usft. Measured Depth. Scan Radius is 2,978.72 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpalhs within 200'+100/1000 of reference Scan Type: 25.00 Anticollision Report for Plan: CD5-316 - CD5-316wpO3.1 iray. Cylinder North Proximity Scan on Current Survey Data (North Reference) 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance Reference Design: CD5 Alpine West Pad - Plan: CDS.M6 - Plan: CD5-316 - CD5-316wp03.1 CD5-06 - CD5-061-1 - CD5-061-1 399.94 199.29 399.94 192.40 400.00 Scan Range: 0.00 to 27,824.03 usft. Measured Depth. Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 49.83 180.20 49.83 177.44 50.00 Scan Radius is 2,978.72 usft. Clearance Factor cutoff Is Unlimited. Max Ellipse Separation is Unlimited Pass - Major Risk CD5-07 - CD5-07 - CD5-07 472.68 182.51 472.68 174.32 Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on 424.70 Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft 49.91 140.16 49.91 CD5 Alpine West Pad 50.00 50.704 Centre Distance Pass - Major Risk CD5-09 - CD5-09 - CD5-09 448.53 141.73 448.53 CD5-04 - CD5-04 - CD5-04 423.77 239.03 423.77 231.72 425.00 32.721 Centre Distance Pass - Major Risk _ CD5-04 - CD5-04 - CD5-04 471.96 239.32 471.96 231.33 475.00 29.926 Clearance Factor Pass - Major Risk CD5-05 - CD5-05 - CD5-05 274.80 219.82 274.80 214.85 275.00 44.253 Centre Distance Pass - Major Risk CD5-05 - CD5-05 - CD5-05 448.09 221.01 448.09 213.17 450.00 28.183 Clearance Factor Pass - Major Risk CD5-06 - CD5-06 - CD5-06 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance Pass - Major Risk CD5-06 - CD5-06 - CD5-06 399.94 199.29 399.94 192.40 400.00 28.923 Clearance Factor Pass - Major Risk CDS-06 - CD5-0611 - CD5-0611 299.99 198.45 299.99 193.14 300.00 37.350 Centre Distance Pass - Major Risk CD5-06 - CD5-061-1 - CD5-061-1 399.94 199.29 399.94 192.40 400.00 28.923 Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 49.83 180.20 49.83 177.44 50.00 65.212 Centre Distance Pass - Major Risk CD5-07 - CD5-07 - CD5-07 472.68 182.51 472.68 174.32 475.00 22.289 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 424.70 158.84 424.70 151.54 425.00 21.741 Centre Distance Pass - Major Risk CD5-08 - CD5-08 - CD5-08 497.84 159.34 497.84 151.01 500.00 19.137 Clearance Factor Pass - Major Risk CD5-09 - CD5-09 - CD5-09 49.91 140.16 49.91 137.39 50.00 50.704 Centre Distance Pass - Major Risk CD5-09 - CD5-09 - CD5-09 448.53 141.73 448.53 133.88 450.00 18.048 Clearance Factor Pass - Major Risk CD5-10 - CD5-10 - CD5-10 424.63 120.03 424.63 112.86 425.00 16.742 Centre Distance Pass - Major Risk CD5-10 - CD5-10 - CD5-10 547.27 120.77 547.27 111.81 550.00 13.480 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 275.20 99.65 275.20 94.80 275.00 20.527 Centre Distance Pass - Major Risk CD5-11 - CD5-11 - CD5-11 474.05 100.61 474.05 92.55 475.00 12.484 Clearance Factor Pass - Major Risk CDS-12 - CD5-12 - CD5-12 250.59 79.56 250.59 75.10 250.00 17.824 Centre Distance Pass - Major Risk CD5-12 - CD5-12 - CD5-12 474.68 80.30 474.68 72.20 475.00 9.913 Clearance Factor Pass - Major Risk CD5-18 - CD5-18 - CD5-18 224.97 38.85 224.97 34.83 225.00 9.669 Centre Distance Pass - Major Risk CD5-18 - CD5-18 - CD5-18 299.82 39.36 299.82 34.08 300.00 7.445 Clearance Factor Pass - Major Risk CD5-18-CD5-18L1 -CD5-18L1 224.97 38.85 224.97 34.83 225.00 9.669 Centre Distance Pass - Major Risk CD5-18 - CD5-181-1 - CD5-18L1 299.82 39.36 299.82 34.08 300.00 7.445 Clearance Factor Pass - Major Risk CD5-21 - CD5-21 - CD5-21 890.28 87.89 890.28 74.13 875.00 6.390 Clearance Factor Pass - Major Risk CD5-313 - CD5-313 - CD5-313 325.10 59.93 325.10 54.52 325.00 11.078 Centre Distance Pass - Major Risk CD5-313 - CD5-313 - CD5-313 647.31 61.27 647.31 50.95 649.95 5.938 Clearance Factor Pass - Major Risk CD5-313 - CD5-313PB1 - CD5-313PB1 325.10 59.93 325.10 54.52 325.00 11.078 Centre Distance Pass - Major Risk O6 March, 2017 - 14:45 Page 2 of 6 COMPASS Anticollision Report for Plan: CD5-316 - CD5-316wpO3.1 iray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Plan: CD5316 - Plan: CDS-316 - CD5316wp03.1 Scan Range: 0.00 to 27,824.03 usft. Measured Depth. Scan Radius is 2,978.72 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited 06 March, 2017 - 14:45 Page 3 of 6 COMPASS Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CDS-313 - CD5-313PB1 - CD5-313PB1 647.31 61.27 647.31 50.95 649.95 5.938 Clearance Factor Pass - Major Risk CD5-314 - CD5-314 - CDS-314 424.76 39.83 424.76 32.50 425.00 5.435 Centre Distance Pass - Major Risk CDS-314 - CD5-314 - CD5-314 672.95 40.71 672.95 30.19 675.00 3.866 Clearance Factor Pass - Major Risk CD5-315 - CD5-315 - CD5-315 49.82 20.33 49.82 17.56 50.00 7.357 Centre Distance Pass - Major Risk _ CDS-315 - CD5-315 - CD5-315 673.48 21.55 673.48 10.68 675.00 1.982 Clearance Factor Pass - Major Risk CDS-315 - CD5-315PB1 - CD5-315PB1 49.82 20.33 49.82 17.56 50.00 7.357 Centre Distance Pass - Major Risk CD5-315 - CD5-315PB1 - CD5-315PB1 673.48 21.55 673.48 10.66 675.00 1.982 Clearance Factor Pass - Major Risk Plan: CD5-17 - Plan: CD5-17 - CD5-17wp09 650.75 16.48 650.75 5.48 650.00 1.498 Centre Distance Pass - Major Risk Plan: CD5-17 - Plan: CD5-17 - CD5-17wp09 675.57 16.77 675.57 5.38 675.00 1.472 Clearance Factor Pass - Major Risk Plan: CD5-17 - Plan: CD5-171-1 - CD5-17L1wp09 650.75 16.48 650.75 5.48 650.00 1A98 Centre Distance Pass - Major Risk Plan: CD5-17 - Plan: CD5.1711 - CD5-1711 wp09 675.57 16.77 675.57 5.38 675.00 1.472 Clearance Factor Pass - Major Risk Plan: CD5-19 - Plan: CD5-19 - CD5-19wp08 (81)) 1,102.74 33.07 1,102.74 15.66 1,100.00 1.899 Centre Distance Pass - Major Risk Plan: CD5-19 - Plan: CD5-19 - CD5-19wp08 (SD) 1,127.24 33.39 1,127.24 15.62 1,125.00 1.879 Clearance Factor Pass - Major Risk Plan: CD5-19 - Plan: CD5-191-1 - CD5-1911 wp08 (BD) 1,102.74 33.07 1,102.74 15.66 1,100.00 1.899 Centre Distance Pass - Major Risk Plan: CD5-19 - Plan: CD5-191-1 - CD5-19L1wp08 (BD) 1,127.24 33.39 1,127.24 15.62 1,125.00 1.879 Clearance Factor Pass - Major Risk Plan: CD5-22 - Plan: CD5-22 - CD5-22wp02 (9A) 781.44 114.71 781.44 101.61 775.00 8.759 Centre Distance Pass - Major Risk Plan: CD5-22 - Plan: CD5-22 - CD5-22wp02 (9A) 806.22 114.87 806.22 101.36 800.00 8.501 Clearance Factor Pass - Major Risk Plan: CD5-23 - Plan: CD5-23 - CD5-23wp01 (9C) 1,707.06 39.71 1,707.06 11.63 1,675.00 1.414 Centre Distance Pass - Major Risk Plan: CD5-23 - Plan: CD5-23 - CD5-23wp01 (9C) 1,730.63 41.33 1,730.63 11.36 1,700.00 1.379 Clearance Factor Pass - Major Risk Plan: CDS-314X - Plan: CD5-314X - CD5-314Xwp07 525.04 34.54 525.04 25.66 525.00 3.977 Centre Distance Pass - Major Risk Plan: CD5-314X - Plan: CD5-314X - CD5-314Xwp07 723.42 35.65 723.42 24.33 725.00 3.110 Clearance Factor Pass - Major Risk Plan: CDS-316 - Plan: CD5-316PB1 - CD5-316PB1wp0 - Plan: CD5-316-Plan: CD5-316PB1-CD5-316PB1wp0 - Rig: CDS-20 - Rig: CDS-20 - Rig: CD5-20 50.52 79.84 50.52 77.46 50.00 33.458 Centre Distance Pass - Major Risk Rig: CD5-20 - Rig: CD5-20 - Rig: CD5-20 652.57 83.35 652.57 72.41 650.00 7.613 Clearance Factor Pass - Major Risk Rig: CD5-20 - Rig: CD5-201-1 - Rig: CD5-20L1 50.52 79.84 50.52 77.46 50.00 33.458 Centre Distance Pass - Major Risk Rig: CD5-20 - Rig: CD5-2011 - Rig: CD5-201-1 652.57 83.35 652.57 72.41 650.00 7.613 Clearance Factor Pass - Major Risk 06 March, 2017 - 14:45 Page 3 of 6 COMPASS Anticollision Report for Plan: CD5-316 - CD5-316wp03.1 Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 36.80 1,200.00 CD5-316wp03.1 GYD-GC-SS 1,200.00 2,200.00 C05-316wp03.1 MWD 1,200.00 2,445.83 CD5-316wp03.1 MWD+IFR-AK-CAZ-SC 2,445.83 3,945.83 CD5-316wp03.1 MWD 2,445.83 18,789.57 CD5-316wp03.1 MWD+IFR-AK-CAZ-SC 18,789.57 20,289.57 CD5-316wp03.1 MWD 18,789.57 27,823.65 CD5-316wp03.1 MWD+IFR-AK-CAZ-SC Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles I (Distance Between Profiles - Ellipse Separation). 411 station coordinates were calculated using the Minimum Curvature method. 06 March, 2017 - 14:45 Page 4 of 6 COMPASS Ladder View Ladder View 14:46, March B6 291 CD5-316wp03.1 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. a N-11 K (amramvra U (�j 300- 00 0 O _ m a �) Ii 1 sa - _- U c U 0 equlvelanl nngnetic Dimes 3500 7000 10500 14000 17500 21000 Displayed interval could be less than entire welhMeasured Depth 36.80 To 27824.03 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.80 1200.00 CD5-316wpO3.1 (Plan: CD5-316) GYD-GC-SS 116.30 116.30 20" x 42" 1200.00 2200.00 CD5-316wpO3.1 (Plan: CD5-316) MWD 2185.80 2445.83 10-3/4" x 13-1/2" 1200.00 2445.83 CD5-316wp03.1 (Plan: CD5-316) MWD+IFR-AK-CAZ-SC 6041.77 13950.26 9 5/8" x 12-1/4" 2445.83 3945.83 CD5-316wp03.1 (Plan: CD5-316) MWD 7438.83 18789.57 7" x 8-3/4" 2445.83 18789.57 CD5-316wpO3.1 (Plan: CD5-316) MWD+IFR-AK-CAZ-SC 7520.80 27824.03 4-1/2" x 6-1/8" 18789.57 20289.57 CD5-316wpO3.1 (Plan: CD5-316) MWD 18789.57 27823.65 CD5-316wpO3.1 (Plan: CD5-316) MWD+IFR-AK-CAZ-SC 0 s s 0 0 00 0 U u uU ® U O t0 CL m rn 5 30 U 0 d 0- 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth EWWVA Ma mtic DWww TC View � TCR required AC Wells Only 13:62, March 02 201 TQC wells ONLY (NOT a Spider) c Easting (6000 usft/in) Easting (6000 usft/in) CD4 Nanuq AC Flipbook CD5-3i6wpo3.1 36.8o To 1000.00 MD Azi 36.8o o.00 400.00 0.00 600.09 200.00 1287.35 208.57 1393.86 208.57 2445.83 222.46 2465.83 222.46 2884.83 224.59 17025.57 224.59 18789.18 172.62 188o9.18 172.62 18926.20 172.62 27823.65 172.62 62 0/36o Tool GYMC-SS MWD MWD.IFR At W -SC MWD MWDHFR-AK{ .SC MWD MWDHFR-AK{ SC -18o/18o 14:1A. March o6 2017 37 Ceaing Dal 400 591 591 Survey Program ND 6.30 MD "6.30 Name 20'x42" Depth From Depth To Survey/Plan v85.8D 244583 io-314"•8'+h° 36.80 f00.00 CD5-3+6,,o3.i(Plan: CDY3+6) 6-4177 895D.x6 9518"xta+la" 12o0.00 12Do.00 CDS-316,Po3.+Plan: CD59+6 7438.83 +8789.57 J"x8914" 1200.00 x44583 [D59�6"o,(Plan: CDp3+6) 75x0.80 2782403 9-+/a" x6a18" x445.83 394583 CD5-3+6wy03.+(Plan: CD13+6) 14461 16581 16581 244583 1873957 CDS-ID6v 0p ,(Plan: CDy316) 20841 22971 22971 +8789.57 20289.57 CD531b"03.+(Plan: CD63+6) +878957 0813.65 CDS-3+6wpo3.l(Plam CD1316) 0/36o Tool GYMC-SS MWD MWD.IFR At W -SC MWD MWDHFR-AK{ .SC MWD MWDHFR-AK{ SC -18o/18o 14:1A. March o6 2017 37 400 400 591 591 771 771 961 961 1141 1141 1331 1331 1511 1511 1700 1700 2761 2761 3831 3831 4890 4890 5950 5950 7011 7011 8071 8071 9141 9141 10201 10201 12331 12331 14461 14461 16581 16581 18711 18711 20841 20841 22971 22971 25101 25101 27227 CD5-3i6wpo3.l l000.00 To 2500.00 MD Azi 36.8o o.00 400.00 0.00 600.09 200.00 1287.35 208.57 1393.86 208.57 2445.83 222.46 2465.83 222.46 2884.83 224.59 17025.57 224.59 18789.18 172.62 188o9.18 172.62 18926.20 172.62 27823.65 172.62 -6o/- 0/270 6o/ 0/270 -120 / 14:27. March o6 2017 Tool 6YDLC-SS MWD MWD.IFP-A.{ .SC MWD MWDHL0.-AK{AZSC MWD MWD.IFNAK. A -SC -18o/18o 37 casing Details ND MD N6.3o 116.30 2165.8. x44583 6041.]] 1395o.z6 7438.83 18]89.5] ]5x0.80 x]&4.03 Tool 6YDLC-SS MWD MWD.IFP-A.{ .SC MWD MWDHL0.-AK{AZSC MWD MWD.IFNAK. A -SC -18o/18o 37 400 400 Survey Program t Prnc Depth From Depth To Survey/Plan a42. 10319�x 13th"1100.00 36.80 0.00 CDy316vo3.1(Man: CDy,6) y 9518"rrz Ve" 1511 1511 CD5-316v ,,3a(Man: CD3316) ]"x8-314" 2761 294583 CD5-316vy ,(Nan: CDY3t6) q-Vz x61/B" x44583 394583 CDYy6nyD3+(Plan: CDy3t6) 5950 x44583 1878957 CDS-316vryD3+(Plan: CD5516) 8071 18]89.5) 20289.57 CDS-3t6w D3.1 (Plan: CDy316) 10201 18]89.5] x7923.65 CDS-316vyD3.1(Plan: CDY316) Tool 6YDLC-SS MWD MWD.IFP-A.{ .SC MWD MWDHL0.-AK{AZSC MWD MWD.IFNAK. A -SC -18o/18o 37 400 400 591 591 771 771 961 961 1141 1141 1331 1331 1511 1511 1700 1700 2761 2761 3831 3831 4890 4890 5950 5950 7011 7011 8071 8071 9141 9141 10201 10201 12331 12331 14461 14461 16581 16581 18711 18711 20841 20841 22971 22971 - 25101 25101 27227 CD5-3i6wpo3.l 2500.00 To 15800.00 MD Azi 36.8o 0.0o 400.00 0.00 600.o92oo.00 1287.35 208.57 1393.86 208.57 2445.83 222.46 2465.83 222.46 2884.83 224.59 17025.57 224.59 18789.18 172.62 188 o g.18 172.62 18926.20 172.62 27823.65 172.62 -6o/- 0/270 6o/ 0/2]0 -120 / : 14:2a. March o6 2017 0/360 Tont GYD'LCSS MWD Mi IFR APP CAZ.SC MWD M WDtIFR PCA2-SC Al Ml -CA'. SC -18o/18o 1 37 Cael^g Detail: 400 591 591 survey Program ID Mo fame Depth it^m Depth To Surveys%an 176.30 17630 io"x qx" 36.8C ioo oo CD5-Iia"`o}�(Pla^-CDS-3:6) 1185.6p x495-83 .i/I's y -x12,1 mo oo o CD5-3i6xyo3'�(Pla^ICDg3�6) 6o9�J] 895016 9518.1x12 -x14" ¢o0 . 94. 3 "4, e+Po3 �( 5916) CD5 Pla^'.CD ]43&83 18]999 Y'x8-319" x44583 394583 CDS'316vryo3-1 (Plan'. CD53�6) ]Sxo Bo x]8i9�o3 4'tl_"x6-314,1 1445 83 +8]895] CDS -3i6veyn3'1(Plan '. CD5316) 20841 22971 22971 18]899 ;0x8957 CD5-3�6wpoY(Plan CD5gi6) 8789.57 2]8x3,65 CD, 116".,(Plan. CD536) 0/360 Tont GYD'LCSS MWD Mi IFR APP CAZ.SC MWD M WDtIFR PCA2-SC Al Ml -CA'. SC -18o/18o 1 37 400 400 591 591 771 771 961 961 1141 1141 1331 1331 1511 1511 - 1700 1700 2761 2761 3831 3831 4890 4890 5950 5950 7011 7011 go 8071 8071 9141 9141 10201 10201 12331 12331 14461 14461- 16581 16581 18711 18711 20841 20841 22971 22971 25101 25101 27227 ICD5-3i6wpO3-1 15800.00 To 27823.65 MD Azi 36.8o o.00 400.00 0.00 600.o9 2oo.00 1287.35 208.57 1393.86 208.57 2445.83 222.46 2465.83 222.46 2884.83 224.59 17025.57 224.59 18789.18 172.62 188og.18 172.62 18926.20 172.62 27823.65 172.62 -6o / : 0/270 -120/: 14:;1. March o6 2017 0/36o Tool LTDLC SS MWD MWD+IFRAWCAZ-SC MWD MWD.IFRAKl -SC MWD ho N.IFRAKC -SC -18o/18o 37 Casing Details 400 591 Survey Program ND ,,6.,a MD 116.3. Name xd x4x" Depth From Depth To SurveylPlan x185.8. z445�83 .314x 13+lx" 36.08. 1x40... CDY 16"03+(Ran: CD59+b) 644883 995..56 9518"x8314" Roo.44 22.0..0 COY3+6wyo3+(Ran:CDSg+b) 3938.83 +BI8953 3"x83/4" 5950 M45 83 sy4&(Plan: CD6316) 352..8. 23824.03 4-Vx"x64/8" M45 83 94583 CDY316 sryo31 (Ra11: CDYy6) 9141 10201 10201 x44583 +838953 C05316,,.3.,(N n'CD53 14461 14461 16581 "789 57 2.x095) CDY3+6ePo3+(Plan: CD136) 18711 20841 20841 10389.53 27823.65 C05-316"1.1 ("an: CD5316) 0/36o Tool LTDLC SS MWD MWD+IFRAWCAZ-SC MWD MWD.IFRAKl -SC MWD ho N.IFRAKC -SC -18o/18o 37 400 400 591 591 771 771 961 961 1141 1141 1331 1331 1511 1511 1700 1700 2761 2761 3831 3831 4890 4890 5950 5950 7011 go 7011-8071 807, 9141 9141 10201 10201 12331 12331 14461 14461 16581 16581 18711 18711 20841 20841 22971 22971 - 25101 25101 27227 Errors Report ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-316 Plan: CD5-316 Plan: CD5-316wp03.1 Errors Report 02 March, 2017 Company: ConocoPhillips(Alaska) Inc.-WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Pian: CD5-316 Wellbore: Plan: CD5-316 Design: CD5-316wp03.1 Errors Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CD5316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: Latitude: From: Map Easting: Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° Well Plan: CD5-316 MWD MWD - Standard Audit Notes: Well Position -NIS 0.00 usft Northing: Latitude: PLAN +EI -W 0.00 usft Easting: Longitude: Position Uncertainty (usft) 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 34.00 usft Wellbore Plan: CD5-316 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 4/15/2017 17.21 80.81 57,505 Design CD5-316wp03.1 MWD MWD - Standard Audit Notes: MWD+IFR AK CAZ SCC MWD MWD - Standard Version: Phase: PLAN Tie On Depth: 36.80 Vertical Section: Depth From (TVD) +NIS +E/ -W Direction (usft) (usft) (usft) (usft) (I (usft) 36.80 0.00 0.00 172.00 Survey Tool Program Date 3/2/2017 From To (usft) (usft) Survey(Wellbore) 36.80 1,200.00 CD5-316wp03.1 (Plan: CD5-316) 1,200.00 2,200.00 CD5-316wp03.1 (Plan: CD5-316) 1,200.00 2,445.83 CD5-316wp03.1 (Plan: CD5-316) 2,445.83 3,945.83 CD5-316wp03.1 (Plan: CDS-316) 2,445.83 18,789.57 CD5-316wp03.1 (Plan: CDS-316) 18,789.57 20,289.57 CD5-316wp03.1 (Plan: CD5316) 18,789.57 27,823.65 CD5-316wp03.1 (Plan: CD5316) Tool Name Description GYD-GC-SS Gyrodata gyro single shots MWD MWD - Standard MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC MWD MWD - Standard MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Mwo MWD -Standard MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 'fanned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hoa. Error (usft) (usft) V) (°) (usft) (usft) (usft) (usft) 36.80 0.00 0.00 0.00 -34.00 0.00 0.00 0.00 100.00 1.15 0.00 0.00 29.20 1.15 0,05 0.05 116.30 1.15 0.00 0.00 45.50 1.15 0.19 0.19 20" x 42" 200.00 1.15 000 0.00 129.20 1.15 0.19 0.19 300.00 1.15 0.00 0.00 229.20 1.15 0.34 0.34 3/22017 3:25:41PM Page 2 COMPASS 5000.1 Build 74 Errors Report Company: ConocoPhillips(Alaska) Inc. AWNS Local Co-ordinate Reference: Well Plan: CDS 316 Project Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CDs Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: C05-316 Survey Calculation Method; Minimum Curvature Design: CD5-316wp03.1 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Horz. Error (usft) (usft) (°) (1) (usft) (usft) (usft) (usft) 400.00 1.15 0.00 0.00 329.20 1.15 048 0.48 KOP: Start 1.5°1100' DLS, 200° TF, for 200.09' 500.00 1.15 1.50 135.00 429.19 1.15 0.56 0.56 600.00 1.16 3.00 109.67 529.11 1.15 0.61 0.61 600.09 1.16 3.00 109.67 529.20 1.15 0.61 0.61 Start2.5°1100' DLS, 10' TF, for 687.26' 700.00 1.16 5.48 113.74 628.83 1.15 0.69 0.68 800.00 1.16 7.97 120.95 728.13 1.15 0.79 0.78 900.00 1.17 10.47 16.87 826.83 1.15 0.92 0.89 1,000.00 1.18 12.96 24.18 924.74 1.15 1.07 1.02 1,100.00 1.19 15.46 25.82 1,021.67 1.15 1.25 1.15 1,200.00 1.21 17.96 26.65 1,117.44 1.15 1.45 1.30 1,287.35 1.22 20.14 26.89 1,200.00 1.14 1.55 1.36 Hold for 106.52' 1,300.00 1.22 20.14 26.90 1,211.68 1.13 1.57 1.36 1,340.61 1.23 20.14 27.71 1,250.00 1.14 1.73 1.38 Base Permafrost 1,393.86 1.23 20.14 27.71 1,300.00 1.14 1.73 1.38 Start 3.5°1100' DLS, III TF, for 1051.97' 1,400.00 1.23 20.35 27.73 1,305.76 1.14 1.74 1.38 1,500.00 1.26 23.68 28.51 1,398.46 1.14 2.07 1.41 1,600.00 1.29 27.05 29.67 1,488.81 1.14 2.55 1.46 1,700.00 1.33 30.45 30.91 1,576.47 1.14 3.16 1.54 1,800.00 1.38 33.87 32.09 1,661.12 1.16 3.89 1.64 1,900.00 1.44 37.30 33.16 1,742.44 1.19 4.72 1.77 2,000.00 1.50 40.74 34.13 1,820.12 1.25 5.64 1.93 2,100.00 1.58 44.19 35.00 1,893.88 1.34 6.64 Vill 2,200.00 1.66 47.64 35.80 1,963.44 1.46 7.71 2.29 2,300.00 1.65 51.10 34.83 2,028.55 1.22 4.02 1.74 2,400.00 1.72 54.57 35.62 2,088.95 1.28 449 1.82 2,445.63 1.78 56.15 35.89 2,115.00 1.24 4.71 1.83 Hold for 20' -10.314" z 13-112" 2,465.83 1.78 56.15 36.14 2,126.14 1.24 4.82 1.83 Start 3.5.1100' DLS, 7.95° TF, for 419.01' 2,500.00 1.81 57.34 36.60 2,144.87 1.25 5.03 1.82 2,600.00 1.89 60.81 38.01 2,196.26 1.30 5.84 1.83 2,658.76 1.97 62.85 39.24 2,224.00 1.42 6.84 1.90 C30 2,700.00 1.97 64.28 39.24 2,242.36 1.42 6.84 1.90 2,800.00 2.06 67.75 40.23 2,283.01 1.59 7.99 2.01 2,884.83 2.13 70.70 40.92 2,313.09 1.78 9.05 2.15 2,884.84 2.13 70.70 40.92 2,313.10 1.78 9.05 2.15 Hold for 14141.13' 2,900.00 2.14 70.70 41.02 2,318.11 1.81 9.24 2.19 3,000.00 2.14 70.70 41.61 2,351.17 2.08 10.53 2.45 322017 3:25.41PM Page 3 COMPASS 5000.1 Build 74 Errors Report Company: ConocoPhillips(Alaska) Inc. -NUNS Local Co-ordinate Reference: Well Plan: CD5-316 Project: Westem North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CDS-316 North Reference: True Wellbore: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp03.1 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc NDSS Vert. Error Lat. Error Hoa. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 3,100.00 2.15 70.70 42.06 2,384.22 2.36 1186 2.73 3,200.00 2.16 70.70 42.39 2,417.28 2.65 13.21 3.02 3,300.00 2.17 70.70 42.66 2,450.34 2.95 14.58 3.33 3,400.00 2.18 70.70 42.87 2,483.39 3.26 15.96 3.64 3,500.00 2.18 70.70 43.04 2,516.45 3.57 17.35 3.96 3,600.00 2.19 70.70 43.18 2,549.51 3.88 18.75 4.28 3,700.00 2.20 70.70 43.30 2,582.56 4.20 20.16 4.61 3,800.00 2.21 70.70 43.40 2,615.62 4.52 21.57 4.94 3,900.00 2.22 70.70 43.48 2,648.68 4.84 22.98 5.27 4,000.00 2.21 70.70 42.08 2,681.73 2.79 10.93 3.12 4,100.00 2.22 70.70 42.23 2,714.79 2.94 11.44 3.27 4,200.00 2.23 70.70 42.36 2,747.85 3.09 11.96 3.43 4,215.59 2.25 70.70 42.47 2,753.00 3.25 12.48 3.59 C-10 4,300.00 2.25 70.70 42.47 2,780.90 3.25 12.48 3.59 4,400.00 2.26 70.70 42.58 2,813.96 3.40 13.01 3.74 4,500.00 2.27 70.70 42.67 2,847.02 3.56 13.54 3.90 4,600.00 2.28 70.70 42.76 2,880.07 3.71 14.07 4.07 4,700.00 2.29 70.70 42.84 2,913.13 3.87 14.60 4.23 4,800.00 2.30 70.70 42.91 2,946.19 4.03 15.13 4.39 4,900.00 2.31 70.70 42.97 2,979.24 4.19 15.67 4.55 5,000.00 2.32 70.70 43.03 3,012.30 4.35 16.21 4.72 5,100.00 2.34 70.70 43.09 3,045.36 4.51 16.75 4.88 5,200.00 2.35 70.70 43.14 3,078.41 4.67 17.29 5.05 5,300.00 2.36 70.70 43.19 3,111.47 4.83 17.83 5.22 5,400.00 2.37 70.70 43.23 3,144.53 4.99 18.37 5.38 5,500.00 2.39 70.70 43.27 3,177.59 5.15 18.92 5.55 5,600.00 2.40 70.70 43.31 3,210.64 5.31 19.46 5.72 5,700.00 2.41 70.70 43.34 3,243.70 5.47 20.01 5.89 5,800.00 2.43 70.70 43.37 3,276.76 5.63 20.55 6.06 5,900.00 2.44 70.70 43.40 3,309.81 5.79 21.10 6.23 6,000.00 2.45 70.70 43.43 3,342.87 5.95 21.65 6.40 6,100.00 2.47 70.70 43.46 3,375.93 6.12 22.19 6.56 6,200.00 2.48 70.70 43.48 3,408.98 6.28 22.74 6.73 6,300.00 2.49 70.70 43.51 3,442.04 6.44 23.29 6.90 6,400.00 2.51 70.70 43.53 3,475.10 6.60 23.84 7.08 6,500.00 2.52 70.70 43.55 3,508.15 6.77 24.39 7.25 6,600.00 2.54 70.70 43.57 3,541.21 6.93 24.94 7.42 6,700.00 2.55 70.70 43.59 3,574.27 7.09 25.49 7.59 6,800.00 2.57 70.70 43.61 3,607.32 7.25 26.05 7.76 6,865.57 2.58 70.70 43.63 3,629.00 7.42 26.60 7.93 KJ 6,900.00 2.58 70.70 43.63 3,640.38 7.42 26.60 7.93 7,000.00 2.60 70.70 43.64 3,673.44 7.58 27.15 8.10 7,100.00 2.61 70.70 43.66 3,706.49 7.74 27.70 8.27 31/2017 3 2541P Page 4 COMPASS 5000.1 Build 74 Errors Report Company: ConccoPhlllips(AJaska) Inc. -WNS Local Co-ordinate Reference: Project Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: Pian: CD5-316 North Reference: Wellbore: Plan: CD5-316 Survey Calculation Method: Design: CD5-316wp03.1 Database: Well Plan: CDS-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat, Error Horz. Error (usft) (usft) (°i (°) (usft) (usft) (usft) (usft) 7,200.00 2.63 70.70 43.67 3,739.55 7.91 28.25 844 7,300.00 2.64 70.70 43.69 3,772.61 8.07 28.81 8.62 7,400.00 2.66 70.70 43.70 3,805.66 8.23 29.36 8.79 7,500.00 2.68 70.70 43.71 3,838.72 8.40 29.91 6.96 7,567.40 2.69 70.70 43.72 3,861.00 8.56 30.47 9.13 K-2 Qannik 7,600.00 2.69 70.70 43.72 3,871.78 8.56 30.47 9.13 7,700.00 2.71 70.70 43.74 3,904.83 8.72 31.02 9.30 7,800.00 2.72 70.70 43.75 3,937.69 8.89 31.57 9.48 7,900.00 2.74 70.70 43.76 3,970.95 9.05 32.13 9.65 8,000.00 2.76 70.70 43.77 4,004.00 9.21 32.68 9.82 8,100.00 2.77 70.70 43.78 4,037.06 9.38 33.24 9.99 8,200.00 2.79 70.70 43.79 4,070.12 9.54 33.79 10.17 8,300.00 2.81 70.70 43.80 4,103.17 9.71 34.35 10.34 8,400.00 2.82 70.70 43.81 4,136.23 9.87 34.90 10.51 8,500.00 2.84 70.70 43.81 4,169.29 10.03 35.46 10.68 8,577.78 2.86 70.70 43.82 4,195.00 10.20 36.01 10.86 Alblan 97 8,600.00 2.86 70.70 43.82 4,202.34 10.20 36.01 10.86 8,700.00 2.87 70.70 43.83 4,235.40 10.36 36.57 11.03 8,800.00 2.89 70.70 43.84 4,268.46 10.53 37.12 11.20 8,843.99 2.91 70.70 43.84 4,283.00 10.69 37.68 11.38 ASub97 8,900.00 2.91 70.70 43.64 4,301.52 10.69 37.68 11.38 9,000.00 2.92 70.70 43.85 4,334.57 10.85 38.24 11.55 9,100.00 2.94 70.70 43.86 4,367.63 11.02 38.79 11.72 9,200.00 2.96 70.70 43.86 4,400.69 11.18 39.35 11.89 9,300.00 2.98 70.70 43.87 4,433.74 11.35 39.90 12.07 9,400.00 2.99 70.70 43.88 4,466.80 11.51 40.46 12.24 9,500.00 3.01 70.70 43.88 4,499.86 11.67 41.02 12.41 9,600.00 3.03 70.70 43.89 4,532.91 11.84 41.57 12.59 9,700.00 3.05 70.70 43.89 4,565.97 12.00 42.13 12.76 9,800.00 3.07 70.70 43.90 4,599.03 12.17 42.69 12.93 9,900.00 3.08 70.70 43.91 4,632.08 12.33 43.24 13.11 10,000.00 3.10 70.70 43.91 4,665.14 12.50 43.80 13.28 10,100.00 3.12 70.70 43.92 4,698.20 12.66 44.36 13.45 10,200.00 3.14 70.70 43.92 4,731.25 12.82 44.91 13.63 10,300.00 3.16 70.70 43.92 4,764.31 12.99 45.47 13.80 10,400.00 3.18 70.70 43.93 4,797.37 13.15 46.03 13.97 10,500.00 3.20 70.70 43.93 4,830.42 13.32 46.58 14.15 10,600.00 3.21 70.70 43.94 4,863.48 13.48 47.14 14.32 10,700.00 3.23 70.70 43.94 4,896.54 13.65 47.70 14.50 10,800.00 3.25 70.70 43.95 4,929.59 13.81 48.26 14.67 10,900.00 3.27 70.70 43.95 4,962.65 13.98 48.81 14.84 3/22017 3:25:41PM Page 5 COMPASS 5000.1 Build 74 Company: ConoccPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CDS Alpine West Pad Well: Plan: C05-316 Wellbore: Pian: C05-316 Design: CD5-316wp03.1 Planned Survey MD Wall) 11,000.00 11,100.00 11,200.00 11,300.00 11,300.37 Alblan 96 11,400.00 11,500.00 11,600.00 11,700.00 11,800.00 11,900.00 12,000.00 12,100.00 12,200.00 12,300.00 12,400.00 12,500.00 12,600.00 12,700.00 12,800.00 12,900.00 13,000.00 13,100.00 13,200.00 13,300.00 13,400.00 13,500.00 13,600.00 13,700.00 13,800.00 13,900.00 13,950.26 9 618" x 12.1/4" 14,000.00 14,100.00 14,200.00 14,300.00 14,400.00 14,500.00 14,600.00 14,700.00 14,800.00 14,900.00 15,000.00 Errors Report Local Cowrdinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hoa. Error (usft) (°) (°) (usft) (usft) (usft) (usft) 3.29 70.70 43.95 4,995.71 14.14 49.37 15.02 3.31 70.70 43.96 5,028.76 14.30 49.93 15.19 3.33 70.70 43.96 5,061.82 14.47 50.49 15.36 3.35 70.70 43.96 5,094.88 14.63 51.04 15.54 3.35 70.70 43.96 5,095.00 14.63 51.04 15.54 3.37 70.70 43.97 5,127.93 14.80 51.60 15.71 3.39 70.70 43.97 5,160.99 14.96 52.16 15.88 3.40 70.70 43.98 5,194.05 15.13 52.72 16.06 3.42 70.70 43.98 5,227.10 15.29 53.27 16.23 3.44 70.70 43.98 5,260.16 15.46 53.83 16.41 3.46 70.70 43.98 5,293.22 15.62 54.39 16.58 3.48 70.70 43.99 5,326.28 15.78 54.95 16.75 3.50 70.70 43.99 5,359.33 15.95 55.50 16.93 3.52 70.70 43.99 5,392.39 16.11 56.06 17.10 3.54 70.70 44.00 5,425.45 16.28 56.62 17.28 3.56 70.70 44.00 5,458.50 16.44 57.18 17.45 3.58 70.70 44.00 5,491.56 16.61 57.74 17.62 3.60 70.70 44.00 5,524.62 16.77 58.29 17.80 3.62 70.70 44.01 5,557.67 16.94 58.85 17.97 3.64 70.70 44.01 5,590.73 17.10 59.41 18.14 3.66 70.70 44.01 5,623.79 17.27 59.97 18.32 3.68 70.70 44.01 5,656.84 17.43 60.53 18.49 3.70 70.70 44.02 5,689.90 17.59 61.08 18.67 3.72 70.70 44.02 5,722.96 17.76 61.64 18.84 3.74 70.70 44.02 5,756.01 17.92 62.20 19.01 3.76 70.70 44.02 5,789.07 18.09 62.76 19.19 3.78 70.70 44.03 5,822.13 18.25 63.32 19.36 3.80 70.70 44.03 5,855.18 18.42 63.88 19.54 3.82 70.70 44.03 5,888.24 18.58 64.43 19.71 3.84 70.70 44.03 5,921.30 18.75 64.99 19.89 3.66 70.70 44.03 5,954.35 18.91 65.55 20.06 3.88 70.70 44.04 5,970.97 19.08 66.11 20.23 3.B8 70.70 44.04 5,987.41 19.08 66.11 20.23 3.90 70.70 44.04 6,020.47 19.24 66.67 20.41 3.92 70.70 44.04 6,053.52 19.41 67.23 20.58 3.95 70.70 44.04 6,086.58 19.57 67.78 20.76 3.97 70.70 44.04 6,119.64 19.74 68.34 20.93 3.99 70.70 44.05 6,152.69 19.90 68.90 21.10 4.01 70.70 44.05 6,185.75 20.06 69.46 21.28 4.03 70.70 44.05 6,218.81 20.23 70.02 21.45 4.05 70.70 44.05 6,251.86 20.39 70.58 21.63 4.07 70.70 44.05 6,284.92 20.56 71.13 21.80 4.09 70.70 44.05 6,317.98 20.72 71.69 21.97 3/22017 3:25:41PM Page 6 COMPASS 5000.1 Build 74 Errors Report Company: ConomPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well Plan: CDS-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: C05 Alpine Wast Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp03.1 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Harz. Error (usft) (weft) V) (°) (usft) (usft) (usft) (usft) 15,100.00 4.11 70.70 44.06 6,351.03 2089. 72.25 22.15 15,200.00 4.13 70.70 44.06 6,38409 21.05 72.81 22.32 15,300.00 4.15 70.70 44.06 6,417.15 21.22 73.37 22.50 15,400.00 4.17 70.70 44.06 6,450.21 21.38 73.93 22.67 15,500.00 4.20 70.70 44.06 6,483.26 21.55 74.49 22.85 15,600.00 4.22 70.70 44.06 6,516.32 21.71 75.04 23.02 15,700.00 4.24 70.70 44.06 6,549.38 21.88 75.60 23.19 15,800.00 4.26 70.70 44.07 6,582.43 22.04 76.16 23.37 15,900.00 4.28 70.70 44.07 6,615.49 22.21 76.72 23.54 16,000.00 4.30 70.70 44.07 6,648.55 22.37 77.28 23.72 16,100.00 4.32 70.70 44.07 6,681.60 22.54 77.84 23.89 16,200.00 4.34 70.70 44.07 6,714.66 22.70 78.40 24.06 16,300.00 4.37 70.70 44.07 6,747.72 22.87 78.96 24.24 16,400.00 4.39 70.70 44.07 6,780.77 23.03 79.51 24.41 16,500.00 4.41 70.70 44.08 6,813.83 23.19 80.07 24.59 16,600.00 4.43 70.70 44.08 6,846.89 23.36 80.63 24.76 16,700.00 4.45 70.70 44.08 6,879.94 23.52 81.19 24.94 16,800.00 4.47 70.70 44.08 6,913.00 23.69 81.75 25.11 16,900.00 4.49 70.70 44.08 6,946.06 23.85 82.31 25.28 16,972.43 4.51 70.70 44.08 6,970.00 24.02 82.87 25.46 HRZ 17,000.00 4.51 70.70 44.08 6,979.11 24.02 82.87 25.46 17,025.57 4.52 70.70 44.08 6,987.57 24.06 83.01 25.50 17,025.97 4.52 70.70 44.08 6,987.70 24.06 83.01 25.50 Start 3°1100' OLS, -80.09° TF, for 1763.6' 17,100.00 5.42 71.10 44.08 7,011.93 24.18 83.29 25.58 17,200.00 8.56 71.68 44.07 7,043.85 24.35 83.31 25.75 17,300.00 12.40 72.31 44.04 7,074.77 24.51 83.09 25.98 17,400.00 16.44 72.99 44.01 7,104.60 24.68 82.63 26.24 17,500.00 20.54 73.71 43.97 7,133.26 24.84 81.95 26.51 17,600.00 24.64 74.48 43.92 7,160.67 25.01 81.04 26.79 17,700.00 28.72 75.29 43.86 7,186.76 25.18 79.92 27.05 17,800.00 32.74 76.13 43.80 7,211.45 25.35 78.59 27.28 17,900.00 36.70 77.01 43.73 7,234.67 25.52 77.07 27.47 17,969.90 40.58 77.65 43.65 7,250.00 25.69 75.36 27.62 Kalubik 18,000.00 40.58 77.93 43.65 7,256.37 25.69 75.36 27.62 18,100.00 44.36 78.87 43.56 7,276.47 25.86 73.47 27.72 18,200.00 48.04 79.85 43.47 7,294.94 26.03 71.41 27.78 18,300.00 51.61 80.84 43.38 7,311.71 26.20 69.19 27.79 18,400.00 55.04 81.87 43.27 7,326.75 26.37 66.82 27.76 18,500.00 58.34 82.91 43.17 7,340.00 26.55 64.30 27.71 18,600.00 61.49 83.96 43.06 7,351.44 26.72 61.65 27.64 18,700.00 64.49 85.03 42.94 7,361.03 26.90 58.87 27.57 aWO17 3:25:41PM Page 7 COMPASS 5000.1 Build 74 Errors Report Company: ConomPhillips(Alaska) Inc. -WNS Local Cc -ordinate Reference: Project Western North Slope TVD Reference: Site: CD5 Alpine Nest Pad MD Reference: Well: Plan: CD5-316 North Reference: Wellbore: Plan: CD5-316 Survey Calculation Method: Design: CD5-316wp03.1 Database: Well Plan: CD5-316 Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Plan: 34.2+36.3 @) 70.80usft (Doyon 19) True Minimum Curvature OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Let Error Hoa. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 18,748.43 67.02 85.56 42.83 7,365.00 27.05 56.29 27.52 Kup C 18,782.73 67.02 85.93 42.83 7,367.55 27.05 56.29 27.52 CD5.314X 01.Heel 022316 DK 18,789.18 67.02 86.00 42.83 7,368.00 27.05 56.29 27.52 CD5316 01.Heel 041316 NA 18,789.57 67.02 8600 42.83 7,368.03 27.05 56.29 27.52 Hold for 20' - 7" z 8-3/4" 18,800.00 67.08 86.00 42.83 7,368.75 27.05 56.34 27.53 18,809.18 67.14 86.00 42.83 7,369.40 27.05 56.39 27.54 18,809.57 67.14 86.01 42.83 7,369.42 27.05 56.39 27.54 Start 3°/100' OLS, -0.02° TF, for 117.01' 18,854.07 67.30 87.35 42.49 7,372.00 27.06 57.04 27.14 LCU 18,900.00 67.30 88.72 42.49 7,373.57 27.06 57.04 27.14 18,926.20 67.33 89.51 42.39 7,373.98 27.06 57.24 27.08 18,926.58 67.33 89.51 42.39 7,373.98 27.06 57.24 27.08 Hold for 8897.45' 19,000.00 67.33 89.51 42.11 7,374.61 27.06 57.80 27.09 19,100.00 67.33 89.51 41.73 7,375.46 27.08 58.58 27.10 19,200.00 67.33 89.51 41.33 7,376.32 27.09 59.39 27.12 19,300.00 67.33 89.51 40.93 7,377.17 27.12 60.23 27.14 19,400.00 67.33 89.51 40.52 7,378.03 27.14 61.09 27.17 19,500.00 67.34 89.51 40.10 7,378.88 27.18 61.98 27.20 19,600.00 67.34 89.51 39.67 7,379.73 27.21 62.89 27.24 19,700.00 67.34 89.51 39.24 7,380.59 27.25 63.82 27.28 19,800.00 67.34 89.51 38.79 7,381.44 27.30 64.78 27.32 19,900.00 67.34 89.51 38.35 7,382.30 27.35 65.76 27.38 20,000.00 67.34 89.51 37.89 7,383.15 27.41 66.75 27.43 20,100.00 67.35 89.51 37.43 7,384.01 27.47 67.77 27.49 20,200.00 67.35 89.51 36.97 7,384.86 27.54 68.80 27.56 20,300.00 67.35 89.51 41.07 7,385.72 27.19 59.98 27.21 20,400.00 67.35 89.51 40.94 7,386.57 27.21 60.26 27.23 20,500.00 67.35 89.51 40.80 7,387.42 27.23 60.54 27.25 20,600.00 67.35 89.51 40.66 7,388.28 27.25 60.83 27.27 20,700.00 67.36 89.51 40.53 7,389.13 27.27 61.13 27.29 20,800.00 67.36 89.51 40.39 7,389.99 27.29 61.42 27.31 20,900.00 67.36 89.51 40.25 7,390.84 27.31 61.72 27.34 21,000.00 67.36 89.51 40.10 7,391.70 27.34 62.03 27.36 21,100.00 67.36 89.51 39.96 7,392.55 27.37 62.34 27.39 21,200.00 67.37 89.51 39.81 7,393.41 27.39 62.65 27.42 21,257.20 67.37 89.51 39.66 7,393.89 27.42 62.97 27.45 CD5316 01.Heel 012617 DK 21,300.00 67.37 89.51 39.66 7,394.26 27.42 62.97 27.45 21,400.00 67.37 89.51 39.52 7,395.11 27.45 63.29 27.48 31212017 3.25.41PM Page 8 COMPASS 5000.1 Build 74 Errors Report Company: ConocoPhillips(Alaske) Inc -WNS Local Co-ordinate Reference: Well Plan: CDS-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Ped MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: C05-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp03.1 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert. Error Lat. Error Hors. Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 21,500.00 67.37 89.51 39.37 7,395.97 27.48 63.61 27.51 21,600.00 67.37 89.51 39.21 7,396.82 27.52 63.94 27.54 21,700.00 67.37 89.51 39.06 7,397.68 27.55 64,27 27.57 21,800.00 67.38 89.51 38.91 7,398.53 27.58 64.60 27.61 21,900.00 67.38 89.51 38.75 7,399.39 27.62 64.94 27.64 22,000.00 67.38 89.51 38.59 7,400.24 27.66 65.26 27.68 22,100.00 67.38 89.51 38.43 7,401.10 27.69 65.63 27.72 22,200.00 67.38 89.51 38.27 7,401.95 27.73 65.97 27.75 22,300.00 67.39 89.51 38.11 7,402.80 27.77 66.32 27.79 22,400.00 67.39 89.51 37.95 7,403.66 27.81 66.68 27.84 22,500.00 67.39 89.51 37.79 7,404.51 27.86 67.03 27.88 22,600.00 67.39 89.51 37.62 7,405.37 27.90 67.39 27.92 22,700.00 67.39 89.51 37.46 7,406.22 27.94 67.76 27.97 22,800.00 67.40 89.51 37.29 7,407.08 27.99 68.12 28.01 22,900.00 67.40 89.51 37.12 7,407.93 28.03 68.49 28.06 23,000.00 67.40 89.51 36.95 7,408.79 28.08 68.86 28.10 23,100.00 67.40 89.51 36.78 7,409.64 28.13 69.24 28.15 23,200.00 67.40 89.51 36.61 7,410.49 28.18 69.62 28.20 23,300.00 67.41 89.51 36.43 7,411.35 28.23 70.00 28.25 23,400.00 67.41 89.51 36.26 7,412.20 28.28 70.38 28.30 23,500.00 67.41 89.51 36.08 7,413.06 28.34 70.76 28.36 23,600.00 67.41 89.51 35.91 7,413.91 28.39 71.15 28.41 23,700.00 67.41 89.51 35.73 7,414.77 28.44 71.54 28.47 23,800.00 67.42 89.51 35.55 7,415.62 28.50 71.94 28.52 23,900.00 67.42 89.51 35.37 7,416.48 28.56 72.33 28.58 24,000.00 67.42 89.51 35.19 7,417.33 28.61 72.73 28.64 24,100.00 67.42 89.51 35.01 7,418.18 28.67 73.13 28.70 24,200.00 67.42 89.51 34.83 7,419.04 28.73 73.53 28.76 24,300.00 67.43 89.51 34.65 7,419.89 28.79 73.94 28.82 24,400.00 67.43 89.51 34.47 7,420.75 28.86 74.34 28.88 24,500.00 67.43 89.51 34.28 7,421.60 28.92 74.75 28.94 24,600.00 67.43 89.51 34.10 7,422.46 28.98 75.17 29.00 24,700.00 67.43 89.51 33.91 7,423.31 29.05 75.58 29.07 24,800.00 67.44 89.51 33.73 7,424.17 29.11 76.00 29.13 24,900.00 67.44 89.51 33.54 7,425.02 29.18 76.41 29.20 25,000.00 67.44 89.51 33.35 7,425.87 29.25 76.83 29.27 25,100.00 67.44 89.51 33.16 7,426.73 29.32 77.26 29.34 25,200.00 67.44 89.51 32.98 7,427.58 29.39 77.68 29.41 25,300.00 67.45 89.51 32.79 7,428.44 29.46 78.11 29.48 25,400.00 67.45 89.51 32.60 7,429.29 29.53 78.53 29.55 25,500.00 67.45 89.51 32.41 7,430.15 29.60 78.96 29.62 25,600.00 67.45 89.51 32.22 7,431.00 29.67 79.40 29.69 25,700.00 67.46 89.51 32.03 7,431.85 29.75 79.83 29.77 25,800.00 67.46 89.51 31.84 7,432.71 29.82 80.27 29.84 3/1/1017 3:25:41PM Page 9 COMPASS 50001 Build 74 Errors Report Company: ConomPhillips(Aleska) Inc. -WMS Local Co-ordinate Reference: Well Plan: CD5-316 Project: Western North Slope TVD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan: 34.2+36.3 @ 70.80usft (Doyon 19) Well: Plan: CD5-316 North Reference: True Wellbore: Plan: CD5-316 Survey Calculation Method: Minimum Curvature Design: CD5-316wp03.1 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert Error Let Error Hort Error (usft) (usft) (°) (") (usft) (usft) (usft) (Ysft) 25 900.00 67.46 89.51 31.64 7,43356 29.90 60.70 29.92 26,000.00 67.46 89.51 3145 7,434.42 29.97 81.14 30.00 26,100.00 67.46 89.51 31.26 7,435.27 30.05 81.58 30.07 26,200.00 67.47 89.51 31.07 7,436.13 30.13 82.02 30.15 26,300.00 67.47 89.51 30.88 7,436.98 30.21 82.47 30.23 26,400.00 67.47 89.51 30.68 7,437.84 30.29 82.91 30.31 26,500.00 67.47 89.51 30.49 7,438.69 30.37 83.36 30.39 26,600.00 67.48 89.51 30.30 7,439.54 30.45 83.81 30.47 26,700.00 67.48 89.51 30.10 7,440.40 30.54 84.26 30.56 26,800.00 67.48 89.51 29.91 7,441.25 30.62 84.71 30.64 26,900.00 67.46 89.51 29.72 7,442.11 30.70 85.17 30.72 27,000.00 67.48 89.51 29.52 7,442.96 30.79 85.62 30.81 27,100.00 67.49 89.51 29.33 7,443.82 30.87 86.08 30.90 27,200.00 67.49 89.51 29.14 7,444.67 30.96 86.54 30.98 27,300.00 67.49 89.51 28.94 7,445.53 31.05 87.00 31.07 27,400.00 67.49 89.51 28.75 7,446.38 31.14 87.46 31.16 27,500.00 67.50 89.51 28.56 7,447.23 31.23 87.92 31.25 27,600.00 67.50 89.51 28.37 7,448.09 31.32 88.38 31.34 27,700.00 67.50 89.51 28.17 7,448.94 31.41 88.85 31.43 27,800.00 67.50 89.51 27.98 7,449.80 31.50 89.31 31.52 27,822.84 67.50 89.51 27.93 7,449.99 31.52 89.42 31.54 CD5314X D2.Toe 022316 DK 27,823.65 67.50 89.51 27.93 7,450.00 31.52 89.42 31.54 CDS-3116 02.Toe 041316 NA - COS316 02.Toe 012617 DK 3/2/2017 3:25:41PM Page 10 COMPASS 5000.1 Build 74 Company: ConomPhillips(Alaska) Inc. -WNS Project: Westem North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-316 Wellbore: Plan: CD5-316 Design: CD5-316wp03.1 Errors Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Plan: CD5-316 Plan: 34.2+36.3 Q 70.80usft (Doyon 19) Plan: 34.2+36.3 @ 70.80usft(Doyon 19) True Minimum Curvature OAKEDMP2 Casing Points Measured Vertical Measured Vertical Depth Casing Hole Depth Depth 6,865.57 Diameter Diameter (usft) (usft) Name 16,972.43 7,040.80 116.30 116.30 20" x 42" 20 42 2,445.83 2,185.80 10-3/4"x13-1/2" 10-3/4 13-1/2 13,950.26 6,041.77 95/8"x12-1/4" 9-5/8 12-1/4 18,789.57 7,438.83 7" x 8-3/4" 7 8-3/4 27,82403 7,520.80 4-1/2"x6-1/8" 4-1/2 6-1/8 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology 6,865.57 3,699.80 K-3 1,340.61 1,320.80 Base Permafrost 16,972.43 7,040.80 HRZ 4,215.59 2,823.80 C-10 2,658.76 2,294.80 C-30 17,969.90 7,320.80 Kalubik 8,577.78 4,265.80 Albian 97 18,854.07 7,442.80 LCU 7,567.40 3,931.80 K-2 Qannik 11,300.37 5,165.80 Albian 96 8,843.99 4,353.80 ASub97 18,748.43 7,435.80 Kup C Plan Annotations Measured Vertical Local COordinates Depth Depth +N/ -S +H -W (usft) (usft) (usft) (usft) Comment 400.00 400.00 0.00 0.00 KOP: Start 1.5°/100' DLS, 200° TF, for 200.09' 600.09 600.00 A.92 -1.79 Start 2.5°/100' DLS, 10° TF, for 687.26' 1,287.35 1,270.80 -126.68 -65.01 Hold for 106.52' 1,393.86 1,370.80 -158.89 -82.55 Start 3.5°/100' DLS, 19.44° TF, for 1051.97' 2,445.83 2,185.80 -657.54 -477.77 Hold for 20' 2,465.83 2,196.94 -669.79 A88.99 Start 3.5°/100' DLS, 7.95° TF, for 419.01' 2,884.84 2,383.90 -940.45 -746.67 Hold for 14141.13' 17,025.97 7,058.50 -10,445.03 -10,115.92 Start 3°/100' DLS, -80.09° TF, for 1763.6' 18,789.57 7,438.83 -12,024.01 -10,623.47 Hold for 20' 18,809.57 7,440.22 -12,043.80 -10,620.90 Start 3°/100' DLS, -0.02° TF, for 117.01' 18,926.58 7,444.78 -12,159.74 -10,605.88 Hold for 6897.45' 27,824.03 To 27824.03' MD, 7520.8' TVD Checked By: Approved By: Date: 3/2/2017 3:25:41PM Page 11 COMPASS 5000.1 Build 74 Pool Report 13:50, March 062017 CD5-316wp03.1 Quarter Mile View WELLBORE TARGET DETAILC (MAP COORDINATE:) Neme ND Shepe CDS31601.H¢M 041016 NA 7038.60 Circe Radius: 1320.(81 CD5-3160234 041316 NA 7520.00 CI21C IRad,,m 1320.00; m -2 -28000 -21000 -14000 -7000 0 7000 14000 21000 28000 West( -)/East(+) (7000 usft/in) I Plan: CD5316, Pla¢ CDS-316, CDS 318wp03 Plan: CDS-314X, Plan: CDS314X, CDS314Xwp0 CDS315, CD5315P81, CDS-315P8 1 Plan: CDS316, Plan: CD5-316PB1, CD5316PB1 CD5-314, CD5314, CD5-31 I PI=: CD5-316, Plan: CDS316PB1, CD53iempo I I Y - I Plan: CD5-316, Plan: CD5-316PB1, CD5316PBi Plan: CDS3 CD5-316wp05 Surface Location 4 CFA! Coordinate Con,erter From: --- - - Datum: NAD83 Region: alaska r Latitude/Longitude Decimal Degrees * UTM Zone: F_ r South G State Plane Zone:F7 Unitir r Legal Description (NAD27 only) Starting Coordinates: Y' 11489283.58 Y: 5965580.48 �i0, s"S -To: -- Datum: NAD27_. Region: alaska r Latitude/Longitude IDecimalDegrees f UTM Zone: True r South * State Plane Zone: I" �-:] Units: us{t . r Legal De=ipWn (NAD27 o*) Coordinates: X 349250.430131659 Y: 5965834.51975506 _Transform _ i Quit Help Datum NAD83 _ Region: alaska . !' Latitude/Lorgtude IDecimalDegrees 71 f UTM Zone: I— r South f• State Plane Zone:q Units: us- r Legal Description (NA.D27 only) -- Starting Coordinates: X: 11489283.58 Y: 190580.46 Datum NAD27 . Region: alaska . t^ Latitude/Longitude IDecimalDegrees C UTM Zone: True r South f State Plane Zone: F-':-] Units usdt R Legal Description (NAD27 only) Township: 011 Range. 004 It �l Meridian I" J Section: l9 FNL 379.60508 FEL . 2727.5022'i Transform Quit Help CD5-316wp05 Surface Casing M CPAICoordinate Comvener o" F From: _____.. -_. __. To: Datum NAD83 Region: Fa—1,,—k,--,Datum NAp27 Region: alaska . !' Latitude/Longitude IDecimalDegims f Latitude longitude IDecimalDegress C UTM Zone F—r South r UTM Zone: True r South R State Plane Zone: I'—�-] Units: us.fl f• State Plane Zone F----] Units: us.ft . Legal Description (NAD27 only) Lr— t Legal Description (NAD27 wry) Starting Cour&sates: ---- K 1488792.70 Endngeoordnates: ---I X 1348759.516754991 Y: 596493274 Y: 5965186.79071353 X i __ ,Transform Quit Help ❑- CPA: Coordinate Converter Datum INAD83 Regiwr alaska r Latitude/Longitude IDearnalDegiees C UTM Zone: r` r South G State Plane Zone:)' J Unitsus-ft i Legal Beecripoon (NAD27 anyl Stag cowdnates: Y' 1140879270 Y: 5964932.74 DatumNAD27 Region alaska r Latitude/Longitude jDacimalDegrees—� C UTM Zane: True r South t' State Plane Zone: I' —�] Units: us -ft . T% Legal Deswipinn (NAD27 Dory) Township: 017 Range: 004 Meridian I" J Section: 18 FFD- 1037.1193 FF - 33207.8%1 Transform 1 Quit Help CD5-316wp05 Intermediate 1 Casing a CPAI Coordinate Converter From. .—___ Datum= NAD83 Region: alaska r Latkude/Longitude IDecimalDegrees C UTM Zone:r— r- South G Stale Plane Zone: !' -I Units: Fur—ft:. r Legal Descroion (NAD27 wn ) Datum: FD -27 --:-:]Region: alaska . C Latitude/Longitude jDacimalDagrees —� C' UTM Zone: True r- South F Stale Plane Zone: I' �-:] Urns: us -g . C Legal Descrplion (NAD27 only) Starting Coordinates: Ending Coordinates:— ' k 1481039.27 X: 341005.672820244 Y: 5957367.79 N 5957622.08735199 Q CPAICoordinate Datum: NAD83 . Region: alaska r Latdude/Longdude IDecimal Degrees C UTM Zone: r- South t: State Plane Zone: Units: usdt . i Legal Description (NAD27 onlyl I- Starting Coordinates: X 11481039.27 -- Y 5957367.79 Tramlam Quit I Help Datum NAp27 Region: alaska r Latitude/Longitude Decimal Degrees C UTM Zone: True r- South • State Plane Zone: F7:-] UNts: us.g R Legal Desorption (NAD27 ordy) - Legal Description--- ---- Townshp: 011 !"J Range: 003 [E':,:] Mardian: P �,] SecGon:F23-- FNL 3480.8488 FEL . 594.47637 l (__ TTrarwForm Quit I Help CD5-316wpO5 Intermediate 2 -Ca I s I ing & Landing M CPAICoordinate Converter rb rte' Ron To: Datum: NAD83 Region: alaska Datum: NAD27 . Region: alaska i Latitude/Longitude DecimalDegreesr Latitude/Longitude IDecimal Degrees r UTM Zone. F_ r South r UTM Zone. Tme r South G State Plane Zone. I" J Units: usft . r State Plane Zone. I" J Units: urft . i Legal Description (NAD27 only) ( Legal Description (NAD27 only) Starling Coordinates: - K 11478421.0 Ending Coordinates:— X 338387.217646533 Y: 5953774.0 Y: 5954028.3842003 Tmns(orm -} Quit Help M CPA[ From* —__— I� Datum: NAD83 Region: alaska f Latitude/Longitude IDecimalDegrees r UTM Zone: [_ r South I.— Stale Plane Zone: r_:1 Unds: F ---ft r Legal De=iprion (NAD27 only) r Starting Coordinates:— X 11470421.0 Y: 5953774.0 Datum NAD27 _ Region alaska . r LatitudOLongitude IDecimal Degrees C UTM Zone: Ttue r South r State Plane Zone. F7:-] Units: usft . G Legal Description (NAD27 only) Township: 011 [jT�, Range: 003 Meridian: N J Section: 26 FNL . 1849.8260 FEL . 3139.3812 L__- Transfom _.� Quit I Help CD5-316wp05 TD Q CPAI Coordinate Converter o O sr4+n From: To: '. Datum NAD83 . Region: aWska . Datum NAD27 . Region: alaska f Latitude/Longitude iDecimalDegrees Latitude/Longitude Decimal Degrees r UTM Zone. I — r South C' UTM Zone: True r South R State Plane Zone:I• J Units: us.g . r StatePlane Zone:[' ---,I Units: urft r Legal Description (NAD27 only) r Legal Description (NAD27 only) Starting Coordinates: F Ending Coordnates:-----._..._..____.___ Y, 1479401.0 Y, 339366.861476783 Y: 5944794.0 Y: 5945048.28574251 Transform _� Quit Help ® CPAICoord!mate From— Datum NAD63 Region. alaska Latitude/Longitude IDecimalDegiees C UTM Zone: r— r South * State Plane Zona: F----:1 Units: urR i LcaalDescription INAD27onlyl Datum: NAD27 . Region: alaska r Latitude/Longitude IDecimal Degrees • UTM Zore: True r South • State Plane Zone I' J Units: urft r Legal Description)NAD27only) Starting Coordnates —Legal X 1479401.0 Y: 5944794.00 Township: 010 Range: 003 F-3- Meridian: `JMeridian: Section: F FNLD 247.55961 FEL 1976.9837 Transform ) quit Help Tollerable Collision Risk Worksheet As -built REVI DATE IBYICKIAPPI DESCRIPTION I REV DATE BY CK APP DESCRIPTION 1 4/24/15 1 CZ I DB I C.A. I UPDATED PER K150003ACS 12 15/2/161 CZ I GO C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT w LOCATION OF THIS SURVEY T12 °D s Q 11N PAD _- CD4 TO ALPINE r D CD5 - . _ ACCESS ROAD CD N S V` q �O m?D LL IT CD1 TP m VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 18, T. 11 N., R. 4 E., U.M. PPp CD -5 OF PAD O�pER nnogoo SN C• nn oo rnv' 1 aoon°na`o'1'rn'` %%xox4"m pE5\GN nn �1`��nion�'�1X�x•�o%�x%o�i���� nn oo Nncn��1 PLANT N N 0 \ NOTE: 15.4 52• 0 a CONDUCTOR CD5—x14 WAS PLUGGED AND p WMF ABANDONED APRIL 2016. KUUKPIK z UMIAQ m ALPINE SURVEY OFFICE PHONE : 907670.4739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS—BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 CE-CD50-1025 1 of 3 2 1 1 14/24/15 1 CZ I DB I C. A. I UPDATED PER K150003ACS 12 15/2/161 CZ I GD I C.A.I UPDATED PER K160003ACSI JALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M.1 WELL Y' X' LAT.(N) LONG.(W) SFNL INEFWLS GND EXIST.PAD CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 1 33.9 CD5-x01 5,965,661.64 1 489 572.44 70' 18 49.155 151' 13 21.378 293 2489 27.6 34.1 CD5-x02 5,965,656.28 1 489 553.29 70' 18 49.099 151' 13 21.934 _f9 �9 2470 28.1 34.1 CD5-x03 5,965,650.92 1 489 534.00 70' 18 49.042 151' 13 22.493 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1 489 514.77 70' 18 48.982 151' 13 23.051 _Y1 �1 2432 26.6 34.2 CD5-x05 5,965,639.80 1 489 495.46 70' 18 48.925 _T51' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1 489 476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151' 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1 489 437.69 70' 18 48.757 151 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 1 5 965 613.12 1.489.399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5.965.607.66 1 489 379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489 360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965,596.59 1 489 341.43 70' 18 48.470 151' '1328.079 363 2259 26.1 34.2 695--x14 -5=e65-o9=rro -3% X8 8--Po&4i#- 368- 3240' 217..6 3$ CD5-14X 5,965,589.94 1 489 317.35 70' 18 48.400 _T51' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489 303.11 70' 18 48.359 -T51' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1 489,283.58 70' 18 48.300 _T51' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1 489 264.31 70' 18 48.243 _151' 13 30.316 386 _T1 8-3 27.7 34.0 CD5-x18 5,965,569.79 1 489245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5.965.564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965.558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965,553.51 1 489 187.22 70' 18 48.016 151' 13 32.552 409 _T1 �06 27.6 33.8 CD5-x22 5,965,548J4 1 489 168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965.5 2.72 1 489 148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1 489 129.64 70' 18 47.846 _T51' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1 489 110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5,965 526.59 7 489 091.09 70' 18 47.732 151' 13 35.340 438 _261 -0 26.3 33.7 CD5-x27 5,965,521.20 1489071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489 052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29I 965 510.40 1.489.033.34 70' 18 47.561 151' 13 37.015 455 1953 27.6 33.6 CD5-x30 1 5,965,594 .97 70' 18 47.504 151' 13 37.575 461 1934 25.3 33.6 CD5-x31 5 965 499.57-71,489.9-94.73,70' 18 47.447 151' 13 38.135 467 1915 26.6 33.6 CD5-x32 5,965,494.13 1 70' 18 47.390 151' 13 38.694 473 1895 26.8 33.6 CD5-x33 5 965 488.75 1,488.956.3b 70' 18 47.333 151' 13 39.248 478 1876 27.0 1 33.6 Should be 1,488,994.73 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. KUUKPIK UMIAQ ALPINE SURVEY OFFICE PHONE: 907.6704739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 1 OF 3 1 2 Bettis, Patricia K (DOA) From: Earhart, Will C <William.C.Earhart@conocophillips.com> Sent: Wednesday, March 22, 2017 11:13 AM To: Bettis, Patricia K (DOA) Subject: RE: CRU CD5-316 Permit to Drill Application (PTD 217-040) Patricia, ConocoPhillips does not plan to pre -produce CRU CD5-316. The well will be flowed back for to remove drilling fluids from the wellbore but after that will be put directly on injection. Thanks Will Will Earhart Drilling Engineer- ConocoPhillips Alaska, Inc William. C. EarhartconocoohIIIIDS.com ATO -1706 Office: +1.907.265.1077 Mobile: +1.540.448.1789 From: Bettis, Patricia K (DOA) [mailto:patricia.bettis@alaska.gov] Sent: Wednesday, March 22, 2017 10:50 AM To: Earhart, Will C <William.C.Earhart@conocophillips.com> Subject: [EXTERNAL]CRU CD5-316 Permit to Drill Application (PTD 217-040) Good morning Will, Does ConocoPhillips plan to pre -produce CD5-316; and if so, for what duration of time? Thank you, Patricia Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission 333 West 71^ Avenue Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Patricia Bettis at (907) 793-1238 or patricia.bettisPala ska.sov. TRANSMITTAL LETTER CHECKLIST WELL NAME: C /a, (,t C'�S - 3 PTD: Development ✓ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: Ca` VI A4— E l POOL: Lp/Vi�l� Kfy�J H I.CJ1�4� © l Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50- (If last two digits _- Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs / acquired for the pilot hole must be clearly differentiated in both well (/ Pilot Hole name (CAU. C6S — 3 h� PFI) and API number (50-jD&- a05� s6 -7Z0_-_9P) from records, data and logs acquired for well name on pit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Comuanv Namee must contact the AOGCC to obtain advance approval of such water well testing ro am. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2XB) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 IT 2170400 (n', . .... ....:..,. APpr Date PKB 3/22/2017 Engineering APPr Date VTL 4/6/2017 Geology Appr Date PKB 3/22/2017 2 2 2 2 2 28 29 30 31 32 33 34 35 36 37 38 39 - � ���nven. gas conforms to AS31.05.030(' 1.A , --- 1 Permit fee attached_ ) (12.A -D) 20 21 22 6 7 -- Initial class/Type -- 2 Lease number a - - - - appropriate - - - NA _ 3 Unique well name and number - NA - - 4 Well located in a defined pool - - - - - Yes 5 Well located Proper - P per distance from drilling - Yes unit boundary 6 Well located proper distance from other - Yes _ wells 17 Sufficient acreage available in drilling _ - .Yes unit :8 If. deviated, is wellbore plat included Yes '9 Operator only affected pa Yes 10 Operator has a bo - - - appropriate bond in - Yes -force 11 Permit can be issued without conservation order 12 Permit can be issued - Yes - Yes 13 without administrative approval Can permit be approved Yes before 15 -day wait 14 Well located within Yes area and strata authorized by Injection Order # 15 All wells within 1/4 mile area of review identified (put 10# in comments) -Yes (For (For service well only) 16 Pre -produced injector: duration of pre -production No 18 Yes _ less than 3 months (For. service well only) Conductor string provided -------------- --- No _ - - 19 Surface casing protects all known USDWs _ - --- ---- CMT voladequate- - to circulate on conductor & surf csg CMT vol adequate to - Yes Yes tie-in long string to surf csg CMT will cover all known Yes r 3 Casing designs adequate Productive horizons - - No for C, T 6 8 permafrost 4 Adequate tankage. or No reserve pit 5 If a re -drill, has a been Yes approved Adequate wellbore separation Propabandosed Yes If diverter required, does it meet regulations Drilling Fluid program - P gram NA Yes schematic &equip list adequate SOPEs, do they meet Yes regulation _ BOPE press ratio g appropriate; test to (put psig in comments) Choke manifold complies - - Yes Yes w/API RP -53 (May 84) Work will occur without operation - Yes shutdown Is presence of H2S gas probable - Yes Mechanical condition of wells within AOR verified (For service Yes Yes well only) Permit can be issued W/o hydrogen sulfide measures - _ Datapresented ___ - Yes on potential overpressure zones Seismic analysis of shallow _ No gas. zones Seabed condition curve y (if - Yes Contact name/phone for weekly progress reports [exploratory poly] NA NA NA Geologic Commissioner: Date: Des -4-110 Engineering /Commissioner: , Date Public ------._well Na SER/me: COLVILLE RIV U1JJT CD5,31S PEM--GeoArea 88 ------_Program SER ---- Unit 50350 _ ------ Well bore seg - On/Off Shore On - - - - _ Annular Dispose Fee00NPRA4, Surf; AA0092347; AA0092344; gg0081817, TProd;- - CRU CD5-316 and CDS-316PH-1. Planned pilot hole to be drilled t loca a top lKupaaruk C & 67, ss _ COLVILLE- RIVER, ALPINE OIL - 120100, governed by Conservation Order No. 4436. Top Productive Interval lies within current affective area of the Alpine Oil Pool assess pay thickness With. CO 4436. A -portion of the productive interval and. the well's total depth lies outside the affective area Of the. Pool; however, and is compliant e that segment of the wellbore is compliant Will 20 AAC 25.055 statewide spacing standards._ Entire wellbore within Colville River Unit. Wellbore will be more than 500' from an external property line where ownership or landownership changes. Half of the productive interval within the Alpine sand lies outside the affective area of AIO 18C Infection Order required prior to injecting into CDS-316.. No wells. within 1/4 mile radius -closest over 1 Well will be Flowed back for clean-up only. (Earhart: 3/22/17) 79' conductor set --------------- mile 2445'.md - ------ - - - - - - - 158% excess - Productive interval will be completed with uncemented pert pup liner Rig has steel tanks; all wasteto approved disposal wells Anti -Collision analysis complete; no major risk failures Diverter waiver granted; -2- AAC 25.035(h)(2) Max formation Pressure is 4070 psig(10.52 ppg EMW); will drill w/ 9.0-11.1 ppg EMW MPSP is 3326 psig; will test BOPS to 3500 psig H2S measures required No wells within 1/4 mile radius H2S measures required. -- - - -- Expected reservoir pressure is 10.54 ppg EMW; will be drilled using g.0 to 11.1 Horizontal production interval to be drilled using 10.5 ppg mud. T cs To Ku ruk Pse mud P- e C sand estimated at 18,748' Mp. - 9 shoe to be set at 18, 78g' MD. Onshore service well to be drilled.. - - L�