Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-2031. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Gas ShutOff Cement Squeeze
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
14,070 13,522'
Casing Collapse
Conductor NA
Surface 2,260psi
Production 4,760psi
Production 5,090psi
Liner 7,020psi
Liner 11,170psi
Liner 7,500psi
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
4,342 2-7/8" 13,982 10,341 10,570psi
Aras Worthington
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
8,430psi
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0312828
197-203
DUCK IS UNIT MPI 1-47A
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-21625-01-00
ENDICOTT
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
10,356 13,909 10,330 2,838
ENDICOTT OIL Same
107 107
12.6# / 13Cr80
TVD Burst
9,738
8,160psi
MD
NA
8,150psi
5,050
5,020psi
6,870psi
2,492
5,043
8,050
2,496
5,050
See Schematic
10,0867"
107 30"
13-3/8"
9-5/8"
2,496
9-5/8"3,379
See Schematic
907-564-4763
aras.worthington@hilcorp.com
Operations Manager
June 1, 2025
14,0732,755
4-1/2"
10,357
Perforation Depth MD (ft):
C.O. 462.007
7"x4-1/2" Baker S-3, 4-1/2" SB3,
2-7/8" WRD, ER Straddle Pkr (x2), SSSS HES HXO LANDING NIP
9,954 MD/8,937 TVD, 9,683 MD/8,989 TVD,
12,390 MD/10,022 TVD, 12,405 MD/10,027 TVD, 1,416 MD/1,416 TVD
NA
12,582
8,429
4,824
4-1/2"
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Justus Hinks
(3691)
DN: cn=Justus Hinks (3691)
Reason: I attest to the accuracy
and integrity of this document
Date: 2025.05.08 15:37:01 -08'00'
Justus Hinks
(3691)
325-290
By Grace Christianson at 7:53 am, May 09, 2025
A.Dewhurst 09JUN25
DSR-5/9/25
10-404
JJL 6/2/25*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2025.06.10 11:19:58
-08'00'06/10/25
RBDMS JSB 061025
Cement Squeeze & Perf K1
END 1-47A
Current Bottom Hole Pressure:3,738 psi @ 9,000’ TVD (SBHPs 6/20/2022; 8.0 ppge)
Max Anticipated Surface Pressure: 2,838 psi Gas Gradient (0.1 psi/ft)
Max Deviation: 81.5° @ 13,106’ MD/ 70 deg @ 9,870’ MD
Minimum ID:1.312” WFT ER Patch @ 12,390’ ELM
Last SL Tag:11,063’ MD (deviation) w/ 2.25” bailer (11/11/2011)
Last CT Tag:13,522’ CTM w/ 2.23 Junk Mill (12/2/2004)
SBHT:182 Deg F @ 9,703’ MD (SBHPS 6/20/2022)
H2S:390 ppm (1/20/2024)
History
A sidetrack drilled in January 1998. RWO in 2001.
Last well test 1000 bwpd, 4 bopd, 27MMSCFD @ 2,067 psi WHP.
Objective
GSO Cement squeeze of perfs shallower than 12,980’ MD, perforate the K1 interval.
Slickline:
1. PT PCE to 250 psi low, 3500 psi high.
2. Pull SSSV.
3. Drift to deviation w/ 2.25” tools.
4. Set DSSSV.
Well Name:END 1-47A API Number:50-029-21625-01
Current Status:Operable Producer PTD #197-203
Estimated Start Date:6/1/2025 Rig:SL, CT
Reg.Approval Req’std?Yes- 403 Estimated Duration:Two weeks
First Call Engineer:Aras Worthington (907) 564-4763 (O) (907) 440-7692 (M)
Reservoir Engineer:Gavin Dittman (907) 564-5246 (O) (907) 903-1903 (M)
Geologist:Brock Rust (907) 777-8394 (O) (615) 306-9509 (M)
Cement Squeeze & Perf K1
END 1-47A
Coiled Tubing:
5. PT PCE to 250 psi low, 3500 psi high.
6. Pull two-part WFT ER patch from 12,390’ ELM
¾ If patch does not release consider milling the upper packer with custom diamond ER
packer mills sourced from Quadco. This was done on End 3-07 in April of 2025.
7. MU memory 2-7/8” CBP drift and GR/CCL tools and log from ~13,100’ MD to ~9,400’ MD.
Flag pipe for perforations, location of flag at WSS discretion. Tie into memory GR/CCL of
04/04/2011.
8. MU 2-7/8” CBP and set @ ~13,100’ MD.
9. MU 1.75” - 2” cementing nozzle (WSS discretion).
10. Load the well with diesel by bullheading or circulating from the bottom. Max tubing pressure
3500 psi.
11. Perform injectivity test into perforations.
Volumes:
¾ 4-1/2” Tubing: 9,646’ x 0.0152 bpf = 147 bbls
¾ 2-7/8” Liner: (13,500’ – 9646’) x 0.0058 bpf = 22 bbls
¾ Total Volume:169 bbls
12. Park nozzle ~10’ above shallowest perforation @ 12,110’ MD.
13. Pump ~10 bbls of 15.8 ppg Class G cement bullheading into the perforations (adjust volume
depending on injectivity).
¾ Minimum thickening time = 10 hours.
i. 1 hour mixing at surface.
ii. 1.5 hours pump down coil assuming 1 bbl / minute
iii. 0.5 hour cement placement assuming 0.5 bbl / minute
iv. 2 hour squeeze time
v. 2 hour contingency
¾ Expected bottom hole temperature 205 deg F
¾ 12,950’ – 12,110’ MD = 840’ x 0.0058 bpf = 5 bbls from CBP to top of perforations.
14. If a 1000 psi pressure bump is observed then lay in the rest of cement @ 1:1.
15. Hesitation squeeze for ~2 hours targeting 2500 psi squeeze in 250 psi increments. Hold each
pressure for 5-15 minutes.
¾ Hold max squeeze pressure for target of 45-60 minutes.
16. If hesitation squeeze is successful cleanout cement with frequent gel sweeps down to PBTD.
¾ First contamination pass should be no later than 2/3 of thickening time.
17. If well is unable to build squeeze pressure, over displace cement by 2-3 bbls and prepare to
repeat squeeze attempt once cement has reached compressive strength. Or consider leaving
cement to set up and milling.
18. Once cement has reached 1000 psi compressive strength PT to 500 psi for five minutes.
19. Perforate 13,002’ – 13,055’ MD (two separate gun runs) with 2” Millenium 6 spf/60 phase (or
similar).
Slickline:
20. PT PCE to 250 psi low, 3500 psi high.
21. Pull DSSSV.
22. Set SSSV.
Cement Squeeze & Perf K1
END 1-47A
Attachments
1. Current Schematic
2. Proposed Schematic
Cement Squeeze & Perf K1
END 1-47A
Current Schematic
Cement Squeeze & Perf K1
END 1-47A
WƌŽƉŽƐĞĚ^ĐŚĞŵĂƟĐ
CBP set @ ~13,100’ MD
Perforations from 13,002’ – 13,055’ MD
• •
RECEIVED Post Office Box 244027
JUL0 Anchorage,AK 99524-4027
Hilcorp Alaska,LLC U 3 2015 3800 Centerpoint Drive
Suite 100
AOGCCAnchorage,AK 99503
Phone: 907/777-8300
Fax: 907/777.-8301
July 29, 2015
Commissioner Cathy Foerster
Alaska Oil & Gas Conservation Commission C) 0 ?
333 West 7th Avenue, Suite 100 o� •J
Anchorage, AK 99501 (I-7/9
Re: Duck Island Unit Well Renaming Request
Dear Commissioner Foerster,
Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island
Unit wells to remove the unused suffixes at the end of each well name. Well names
currently include a forward slash "/" followed by an obsolete bottom hole location
designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack
designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21"
would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original
and new names for all Duck Island wells.
While performing the review of Duck Island well names, HAK found a single well, "DUCK
IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A"
label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI
4-20/134" (PTD# 1861500). The original wellbore, abandoned 10/13/1986, was
sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to
be one of the first sidetracks performed at Endicott. While the bottom hole code was
changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also
included on the attached spreadsheet.
Sincerely,
Wyatt Rivard
Well Integrity Engineer
Hilcorp Alaska, LLC
CC Dave Roby
Victoria Loepp
i 0
mAPI_WeIINo PeritNumber WeflName Orig
WeIlNumber New
WellNumber
50029218010000 1880370 DUCK IS UNIT MPI 1-01/J19 1-01
50029226010000 1951500 DUCK IS UNIT MPI 1-03/P16 1-03
50029216050000 1861060 DUCK IS UNIT MPI 1-05/020 1-05
50029217430000 1870810 DUCK IS UNIT MPI 1-09/118 1-09
50029217430100 1970290 DUCK IS UNIT MPI 1-09A/L21 1-09A
50029221070000 1901570 DUCK IS UNIT MPI 1-11/SN4 1-11
50029223610000 1930560 DUCK IS UNIT MPI 1-15/P25 1-15
50029221000000 1901500 ;DUCK IS UNIT MPI 1-17/SN2 1-17
50029221000100 1961990 DUCK IS UNIT MPI 1-17A/117 1-17A
50029225690000 1950930 DUCK IS UNIT MPI 1-19/118 1-19
50029220050000 1900020 DUCK IS UNIT MPI 1-21/K25 1-21
50029225100000 1941280 DUCK IS UNIT MPI 1-23/015 1-23
50029217220000 1870420 DUCK IS UNIT MPI 1-25/N22 1-25
50029217220100 1970750 DUCK IS UNIT MPI 1-25A/K22 1-25A
50029216930000 1870090 DUCK IS UNIT MPI 1-27/P20 1-27
50029216690000 1861810 DUCK IS UNIT MPI 1-29/M25 1-29
50029225620000 1950720 DUCK IS UNIT MPI 1-31/M21 1-31
50029225770000 1951070 DUCK IS UNIT MPI 1-33/M23 1-33
50029225770100 1980870 DUCK IS UNIT MPI 1-33A/L24 1-33A
50029225770200 1982550 DUCK IS UNIT MPI 1-33B/L24 1-33B
50029225770300 2050040 DUCK IS UNIT MPI 1-33C/M24XX 1-33CXX
50029216720000 1861840 DUCK IS UNIT MPI 1-35/025 1-35
50029217480000 1870900 DUCK IS UNIT MPI 1-37/P24 1-37
50029218270000 1880630 DUCK IS UNIT MPI 1-39/P17 1-39
50029218270100 2061870 DUCK IS UNIT MPI 1-39A/N-16 1-39A
50029217130000 1870320 DUCK IS UNIT MPI 1-41/023 1-41
50029218640000 1881050 DUCK IS UNIT MPI 1-43/P26 1-43
50029219910000 1891240 DUCK IS UNIT MPI 1-45/Q26 1-45
50029216250000 1861310 DUCK IS UNIT MPI 1-47/021 1-47
0029216250100 1972030 DUCK IS UNIT MPI 1-47A/M20 1-47A
7.>550029218410000 1880780 DUCK IS UNIT MPI 1-49/P21 1-49
50029223040000 1921190 DUCK IS UNIT MPI 1-51/V20 1-51
50029225010000 1941120 DUCK IS UNIT MPI 1-53/Q20 1-53
50029217880000 1880210 DUCK IS UNIT MPI 1-55/R25 1-55
50029218730000 1881140 DUCK IS UNIT MPI 1-57/R23 1-57
50029226440000 1960220 DUCK IS UNIT MPI 1-59/024 1-59
50029225200000 1941420 DUCK IS UNIT MPI 1-61/Q20 1-61
50029219050000 1890060 DUCK IS UNIT MPI 1-63/T22 1-63
50029226270000 1951880 DUCK IS UNIT MPI 1-65/N25 1-65
50029226270100 2032120 DUCK IS UNIT MPI 1-65A/N27 1-65A
50029219850000 1891140 DUCK IS UNIT MPI 1-67/T20 1-67
50029220200000 1900290 DUCK IS UNIT MPI 1-69/V19 1-69
50029215680000 1860630 DUCK IS UNIT MPI 2-02/P18 2-02
50029215850000 1860820 DUCK IS UNIT MPI 2-04/M19 2-04
50029216990000 1870180 DUCK IS UNIT MPI 2-06/J22 2-06
50029217710000 1880040 DUCK IS UNIT MPI 2-08/K16 2-08
50029223020000 1921170 DUCK IS UNIT MPI 2-12/Q16 2-12
50029216390000 1861490 DUCK IS UNIT MPI 2-14/016 2-14
50029218850000 1881340 DUCK IS UNIT MPI 2-16/M16 2-16
50029220320000 1900430 DUCK IS UNIT MPI 2-18/L16 2-18
50029220480000 1900600 DUCK IS UNIT MPI 2-20/115 2-20
50029219310000 '1890340 DUCK IS UNIT MPI 2-22/L14 2-22
XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
RESCAN
Color items - Pages:
Gray.scale, halftones, pictures, graphs, charts-
Pages: 5~
Poor Quality Original'- Pages:
Other- Pages:
DIGITAL DATA
Diskettes, No.
[] Other, No/Type
-OVERSIZED
n Logs of various kinds
n Other
Complete
COMMENTS:
Scanned by: ~ve,y Mildred Daretha n Lowell
isl
TO RE-SCAN
Notes:
Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: Isl
• •
by
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 22, 2012
Mr. Jim Regg Iq7-g-c) 3
Alaska Oil and Gas Conservation Commission — t (k t ' F 9 ‘ - ‘ )
333 West 7 Avenue t� V r
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of Endicott Row 1
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott
Row 1 that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
/ � U
Mehreen Vazir
BPXA, Well Integrity Coordinator
I 0
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
Endicott Row 1
Date: 09/24/2010
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
END1 -01 /J -19 1880370 50029218010000 1.5 0.3 0.5 9/2/2010 0.85 9/23/2010
END1 -03 / P -16 1951500 50029226018000 4.0 3.5 0.5 9/2/2010 5.10 9/23/2010
END1 -05 / 0 -20 1861060 50029216050000 0.3 NA 0.3 NA 1.70 9/23/2010
END1 -09 / L -21 1970290 50029217430100 6.0 5.0 0.5 8/28/2010 3.40 9/23/2010
END1 -15 / P -25 1930560 50029223610000 4.0 3.0 0.5 9/2/2010 6.80 9/23/2010
END1 -17 / I -17 1961990 50029221000100 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010
END1 -19 /1-18 1950930 50029225690000 7.0 9.3 0.5 9/2/2010 4.25 9/23/2010
END1 -21 / K -25 1900020 50029220050000 2.5 1.5 0.5 9/2/2010 1.70 9/23/2010
END1 -23 / 0-15 1941280 50029225100000 12.0 12.5 0.5 9/2/2010 1.70 9/23/2010
END1 -25 / K -22 1970750 50029217220100 5.0 1.5 0.5 9/2/2010 5.10 9/23/2010
END1 -27 / P -20 1870090 50029216930000 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010
END1 -29 / M -25 1861810 50029216690000 2.0 1.3 0.5 9/2/2010 1.70 9/23/2010
END1 -31 / M -21 1950720 50029225620000 5.0 1.8 0.5 9/2/2010 13.60 9/23/2010
END1 -33 / L -24 1982550 50029225770200 1.5 0.3 0.5 9/2/2010 3.40 9/23/2010
END1 -35 / 0-25 1861840 50029216720000 8.0 4.8 0.5 9/2/2010 3.40 9/23/2010
END1 -37 / P -24 1870900 50029217480000 0.5 NA 0.5 NA 4.25 9/23/2010
END1 -39A / N -16 2061870 50029218270100 0.5 NA 0.5 NA 6.80 9/23/2010
END1 -41 / 0-23 1870320 50029217130000 8.0 5.2 0.5 9/2/2010 4.25 9/23/2010
END1 -43 / P -26 1881050 50029218640000 2.0 0.5 0.5 9/2/2010 3.40 9/23/2010
END1 -45 / 0 -26 1891240 50029219910000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010
. -" END1 -47A / M -20 1972030 50029216250100 1.0 0.1 0.5 9/2/2010 3.40 9/24/2010
END1 -49 / P -21 1880780 50029218410000 1.0 0.8 0.5 9/2/2010 3.40 9/24/2010
END1 -51 / V -20 1921190 50029223040000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010
END1 -53 / 0 -20 1941120 50029225010000 9.0 4.2 0.5 9/2/2010 1.70 9/24/2010
END1 -55 / R -25 1880210 50029217880000 1.3 0.1 0.5 9/2/2010 1.70 9/24/2010
END1 -57 / R -23 1881140 50029218730000 3.0 1.3 0.5 9/2/2010 5.10 9/24/2010
END1 -59 / 0 -24 1960220 50029226440000 3.0 1.3 0.5 9/2/2010 0.85 9/24/2010
END1 -61 /0 -20 1941420 50029225200000 8.0 6.8 0.5 9/2/2010 2.55 9/24/2010
END1 -63 / T -22 1890060 50029219050000 8.0 4.1 0.5 9/2/2010 2.55 9/24/2010
END1 -65A / N -27 2032120 50029226270100 8.0 5.8 0.5 9/2/2010 3.40 9/24/2010
END1 -67 / T -20 1891140 50029219850000 0.5 NA 0.5 NA 1.70 9/24/2010
END1 -69 / V -19 1900290 50029220200000 15.0 10.3 0.5 9/2/2010 0.85 9/24/2010
STATE OF ALASKA
ALASKA L AND GAS CONSERVATION COMMISSII
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other pi Patch
Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ 12390 -12405
Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development 0 Exploratory ❑ '∎ 197 -2030
3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number:
Anchorage, AK 99519 - 6612 . 50- 029 - 21625 -01 -00
8. Property Designation (Lease Number) : 9. Well Name and Number:
ADL- 312828 • 1- 47A/M -20
10. Field /Pool(s):
ENDICOTT FIELD / ENDICOTT OIL POOL
11. Present Well Condition Summary:
Total Depth measured 14070 feet Plugs (measured) NONE feet
true vertical 10356.35 feet Junk (measured) 13522 feet
Effective Depth measured 13909 feet Packer (measured) SEE BELOW feet
true vertical 10329.61 feet (true vertical) SEE BELOW feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor
Surface 2455 13 3/8" 68" NT8OCYHE 41 - 2496 41 - 2493 5020 2270
Production 5011 9 5/8" 47# NT8OS 39 - 5050 39 - 5043 6870 4760
Production 3374 9 5/8" 47# NT95HS 5050 - 8424 5043 - 8046 8150 5080
Liner 4824 7" 29# L -80 7758 - 12582 7527 - 10086 8160 7020
Liner 4263 2 7/8" 6.6# 13CR60 9646 - 13909 8969 - 10330
Liner 2741 4 1/2" 12.6# L -80 11329 - 14070 9566 - 10356 8430 7500
Perforation depth: Measured depth: SEE ATTACHED
True Vertical depth:
Tubing: (size, grade, measured and true vertical depth) 4- 1/2" 13 -CR -80 37 - 9738 37 - 9017
Packers and SSSV (type, measured and true vertical depth) 7" X 4 1/2" BAKER S -3 9594 8937
4 1/2" BAKER SB3 9683 8989
2 7/8" WRD ER STRADDLE PKR 12390 10022
2 7/8" WRD ER STRADDLE PKR 12405 10027
RE( V
12. Stimulation or cement squeeze summary:
Intervals treated (measured): JAN L 7 (01
Treatment descriptions including volumes used and final pressure: l8' kao iat: ,; , as t'; #a „ Ammissw
/'kr :rhlt: °,.
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure
Prior to well operation: 19 8999 1066 2430
Subsequent to operation: 4 5385 456 2569
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory Development 0 ° Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil 0.4 U Gas ❑ WDSPL ❑
GSTOR ❑ WINJ ❑ WAG GINJ ❑ SUSP❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Nita Summerhays
I
Printed Name Nita Summerhay 1 Title Data Manager
Signature 'd�.pr. __ Phone 907 - 564 -4035 Date 1/13/2012
t'
Form 10 -404 Revises t`,iitl S JAN 1 8 201 y Submit /Orr final Only
1-47A/M-20
PERF I
l
CHMENT
Sw Name 'Operation Date Perf Operation Code Meas Depth Top Meas Depth Base 1 Tvd Depth Top Tvd Depth Base
1-47A/M-20 1/24/98 PER 12,930. 12,950. 10,170.19 10,174.19
1-47A/M-20 1/24/98 PER 13,458. 13,478. 10,254.91 10,258.34
-- I
1-47A/M-20 3/8/98 APF 12,800. 12,820. 10,141.85 10,146.5
1-47A/M-20 1/18/01 MLK 9,312. 9,313. 8,737.45 8,738.19
1-47A/M-20 4/8/01 SQZ 12,800. 13,478. 10,141.85 10,258.34
1-47A/M-20 6/15/01 APF 13,458. 13,478. 10,254.91 10,258.34
1-47A/M-20 6/16/01 APF 12,846. 12,866. 10,152.38 10,156.76
1-47A/M-20 6/16/01 APF 12,885. 12,905. 10,160.89 10,165.12
1-47A/M-20 6/16/01 APF 12,930. 12,950. 10,170.19 10,174.19
1-47A/M-20 6/17/01 APF 12,800. 12,820. 10,141.85 10,146.5
1-47A/M-20 10/2/11 BPS 8,792. 13,478. 8,320.98 10,258.34
1-47A/M-20 11/11/11 BPP 8,792. 13,478. 8,320.98 10,258.34 II
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF t
1
BPP BRIDGE PLUG PULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE i
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE '
1
•
• •
1- 47A/M -20
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
i
12/8/2011 ** *CONT. FROM 12/07/11 WSR * ** (Pre Coil Patch /Profile Modification)
PULLED 4 -1/2" BBE (SN: BD -10) FROM SVLN @ 1384' SLM/1416' MD
** *WELL LEFT SHUT IN, WELL TENDER NOTIFIED * **
12/16/2011 CTU #9 1.
Job S .•e : WFD 2 -7/8" Straddle for GSO
MIRU «< Job in Progress »>
12/17/2011 CTU #9 1.75 "CT «< Continue WRS from 12/16/11 >» ✓
Job Scope : WFD 2 -7/8" Straddle for GSO
RIH w / SLB 2.20" Memory GR /CCL logging tools. Log up from 12600' to
12000'CTM. POOH. Correlate GR/CCL log to Ref Log: SLB Memory Jewelry
Log LEE GR /CCL/TNN/TFN dated 04/04/2011 ( +27' depth shift). RIH w/ 2 -7/8"
WFD ER Bottom Straddle Packer to flag at 12348'CTM and reset counter to
12361.8'ELM. Set middle element of 2.24 "x 2.63' WFD 2 -7/8" ER Bottom
Straddle Packer at 12,410'ELM (ID= 1.438 "). POOH. RIH top packer. «< Job
in Progress »>
12/18/2011 CTU #9 1.75 "CT «< Continue WRS from 12/17/11 »>
Job Scope : WFD 2 -7/8" Straddle for GSO
RIH w / WFD 2 -7/8" ER Top Straddle Packer and spacer pipe. Sting into snap
latch. Set top packer @ 12390'ELM (min ID = 1.312 "). POOH. Recover 1/2"
ball. RDMO « <Job Complete »>
FLUIDS PUMPED
BBLS
90 50/50 METH
30 60/40 METH
105 1%S KCL
225 TOTAL
TREE= 4- 1/16" CIW FLS SAFETY ES: WELL REQUIRES SSSV.
WELLHEAD = FMC END1 -47A 4-1/2" T ROM IS 2 . ALL NIPPLES
OFF RE 9- HROME
ACTUATOR = BAKER C -
KB. ELEV = 51.1' SCHEMATIC IS CORRECT***
BF. ELEV = 17.2'
KOP=
Max Angle = 81° @ 13105'
Datum MD = 12487'
Datum ND = 10000 SS I _ I 1416' I-i SSSV HES HXO LANDING NIP, ID = 3.813"
13 -3/8 ", 68 #, NT -80 CYHE BUTT H 2496'
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
Minimum ID = 1.312" @ 12390' 7 3471 3466 MMG DOME RK 16 12/07/04
2 -7/8" ER STRADDLE PKR 6 5291 5284 MMG SO RK 20 12/07/04
5 6297 6274 MMG DMY RK 0 08/25/04
4 7105 6991 MMG DMY RK 0 08/25/04
I4 -1/2 ", 12.6 #, 13 -CR -80 NSCT I 3 7959 7685 KBG-2 DMY RK 0
2 8852 8370 KBG -2 DMY RK 0
19 -5/8" 47# XO, NT -80 -S TO NT -95 -HS H 5050' I-- 1 9505 8876 KBG -2 DMY RK 0
7" 7" BAKER ZXP LINER 7758'
li
8732' H EST TOP OF CEMENT IN IA I
■
9574' I -112" HES X NIP, ID = 3.813" I
BOTTOM 9 5/8" CASING ( TOP OF WINDOW) 8424 •
4 9594' —I 7" X 4-1/2" BAKER S -3 PKR I
PERFORATION SUMMARY '• 9618' 1-14 -1/2" HES X NIP, ID = 3.813" I
REF LOG:
ANGLE AT TOP PERF: 9646' I—I TOP OF 2 -7/8" LNR
Note: Refer to Production DB for historical pert data • 9674' I-1 CHEM CUT (DRLR DEPTH - OLD COMPLETION) I
SIZE SPF INTERVAL OpnlSgz DATE 4
4-1/2" 12800 - 12820 0 9. 9685' H OVERSHOT W/ NO -GO UNIQUE, ID = 4.625" I
4 -1/2" 13458 - 13478 0
4-1/2" 12930 - 12950 0 9683' I—I SB -3 PKR (DRLR DEPTH - OLD COMPLETION) 1
7" 11400 - 11404 S
7" 12110 - 12114 S
7" 12530 - 12534 S
/ \ I 9738' H WLEG (DRLR DEPTH - OLD COMPLETION) I
T .,.• 10250' H ESTIMATED WC TOP OF CEMENT I
... /M'
1j329 / HMC HGR
12-7/8" LNR, 6.6 #, 13 -CR -60 `1. ia.
i t)" ! 12390 -' 12410' ELM I— 2 -7/8" WRD ER STRADDL
ID= 1.312" (12/18/11)
7" 29 #/ft Hydrill 511 12582
1�
1 13522' H2 -7/8" FAST DRILL BRIDGE PLUG I
1
PBTD 13909' ;�.
4.5" 12.6#/ft L -80 HYDRIL 511 14070' /'t.•t,T•.
DATE REV BY COMMENTS DATE REV BY COMMENTS ENDICOTT UNIT
08/08/86 ORIG COM PLETION 12/18/11 JJL/ PJC SET STRADDLE PKR WELL: 1- 47A/M -20
01/17/98 D-15 SIDETRACK (1 -47A) PERMIT No: '1972030
06/09/01 D-15 RWO API No: 50- 029 - 21625 -01
02/10/05 GRC/TLH 9 -5/8" CSG CORRECTION SEC 36, T12N, R16E, 2146' FNL & 2170' FEL
02/16/11 MB /JMD ADDED SSSV SAFETY NOTE
11/09/11 RM/ PJC TREE C/O (10/22/11) BP Exploration (Alaska)
t97- 2.03
2, tt t 2.
24 -AUG -2011
Schkunbener
No. 5782
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503 -2838 Attn: Christine Shartzer
ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
N -11C BG4H -00048 LDWG EDIT OF RST 21- Apr -11 1 1
1- 47AIM -20 BLPO -00093 LDWG EDIT OF MCNL 4- Apr -11 1 1
r , 02 -21B BAUJ -00081 LDWG EDIT OF MCNL 13- May -11 1 1
02-36A BAUJ -00038 LDWG EDIT OF MCNL 31-Jul-11 1 1
15 -09A BBKA -00096 LDWG EDIT OF RST 15- Mar -11 1 1
E -14A BCRD -00087 LDWG EDIT OF RST 5- Mar -11 1 1
ir E-23C BD88 -00124 LDWG EDIT OF MCNL 13-Jun-11 1 1
09 46 BMSA -00006 LDWG EDIT OF RST 2- Mar -11 1 1
C-42A BD88 -00107 LDWG EDIT OF MCNL 25- May -11 1 1
• PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data & Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400
900 E. Benson Blvd. Anchorage, AK 99503 -2838
: d' ✓ 1t `4 gin
.,
04/28/11
Schimmberger NO. 5729
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503 -2838 Attn: Christine Shartzer
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
15 -09A BBKA -00096 PRODUCTION PROFILE .> 1i eti AIMINI ' Z 1
17 -06 BBKA -00094 INJECTION PROFILE Ifs E1 • FIT!'
C -12B BAUJ -00064 MEM PRODUCTION PROFILE _, Y = Q » aI�' r � e:TYah1u 1
G -23B BLPO -00079 4 , ' E ECUM I III I la= I EONS? I 1
16 -08A BJGT -00022 MEIFG=i - ' ' P • 1
02 -180 BLPO.00087 Id - ' - -Z' 1
J -22A BJGT -00023 t *-milw5T•1• — ' -• raillII 1
1-210 BLPO -00086 • ' • • _Ii]SCNZ"L'1' ' 15MILW 1
V -105 BLPO -00091 MEM INJECTION PROFILE l ' �! Y 1
'4-220 BBSK -00065 • • - • WAras" ral ♦ . ' WYiN 1
III
V -212 BD88.00096 T ' ' C ION PRO ILE roEe'RG 0'f P e' f& 1
L -214A BCRJ -00073 INJECTION PROFILE E'A el l j.1 ' F. 1
V -223 BAUJ -00071 • ''• T•V. r YM1 ' S STWI 1
V -217 BAUJ- 00077 W'ala aMil ak:i 2MAI S _ 31 7 rO I CAM s7 ' ONJZ 1
3- 05/0 -29 BG4H- 00043 ' ' w 1
1- 47AIM -20 BLPO -00092 1' Il' 9 da. 7.11INtU199a•17�9"�� ' Ii!T •�`.rC~i 1
1- 25A/K -22 BBSK -00057 L.:i Uew 5LIC2111111•11 1
S -01C BCUE -00113 CITE'- M !MUL1 MgArilIMIN 1
11 -30 B088-00097 MEM INJECTION PROFILE GL ZEIMI " NME 1
04 -11A AM-00134 11.813 8l,I32 tl:(•]dls: L� _ rt•3iLtJTW21■1111 ' IiTt'L -i 1
P2 -41 BG4H -00044 PRODUCTION PROFILE _M ' wtv.1 1
D -266 BMSA -00009 F 3Z. ' ' -• 'T4/1111111111• 1
02 -18B BLPO -00087 MEM PRODUCTION PROFILE , - ,..■ AL lc Emma et a i
Z-20 BPSG -00010 IMIIIMEIMEMEMEMEMINEIMM 03/29/11 1 t • .T 1
Y -29A BCUE -00122 MEM LDL .. 4 03/20/11 1 1
MOM
MOMENIIMIIIIIIMMEN
MNIMMOMIIMIIMIIMIIMI
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc Alaska Data & Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400
900 E. Benson Blvd Anchorage, AK 99503-2838
O1
') STATE OF ALASKA )
ALASKA Oil AND GAS CONSERVATION COMMISSION ,;"..
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
Abandon D
Alter Casing D
Change Approved Program D
Repair Well 00 PluQ PerforationsD
Pull Tubing D Perforate New Pool D
Operation Shutdown D Perforate D
2 [) 2005
Stimulate D OtherD
WaiverD Re-::::::::::!§!~~
55.20
8. Property Designation:
ADL-312828
11. Present Well Condition Summary:
4. Current Well Class:
Development [!]
Stratigraphic D
9. Well Name and Number:
1-47A1M-20
10. Field/Pool(s):
Endicott Field / Endicott Oil Pool
Exploratory D
Service D
5. Permit to Drill Number:
197-2030
6. API Number
50-029-21625-01-00
2. Operator
Name:
3. Address:
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
Total Depth
measured 14075 feet
measured 13521 feet
true vertical 10265.8 feet
Plugs (measured)
Junk (measured)
None
true vertical 10357.2 feet
Effective Depth
13522
Casing Length Size MD TVD Burst Collapse
Production 5011 9-5/8" 47# NT80S 39 - 5050 39.0 - 5043.0 6870 4760
Production 3374 9-5/8" 47# NT95HS 5050 - 8424 5043.0 - 8046.1 8150 5080
Surface 2455 13-3/8" 68# NT80CYHE 41 - 2496 41.0 - 2492.5 5020 2270
Perforation depth:
Measured depth: 12800 -12820,12846 -12866,12885 -12905,12930 -12950,13458 -13478
True vertical depth: 10141.85 -10146.5,10152.38 -10156.76,10160.89 -10165.12,10170.19 -10174.19,10254.91 -10258.34
Tubing ( size, grade, and measured depth):
4-1/2" 12.6# N-80
4-1/2" 12.6# L-80
@ 37
@ 9673
9673
SOAWNED FEB 2 8 2005
Packers & sssv (type & measured depth):
7" Baker ZXP Packer
4-1/2" Baker S-3 Perm Packer
4-1/2" Baker SB3 Packer
@
@
@
7758
9683
9598
12. Stimulation or cement squeeze summary:
Intervals treated (measured): 8732' - 9219'
Treatment descriptions including volumes used and final pressure: 22 Bbls 15.8 # Class G Cement @ 400 psig
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl Casing Pressure
19.7 4512 300
2.2 8676 500
RBOMS BFl FEB 2 8 2D05
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
1187
1255
Tubing Pressure
1398
501
Copies of Logs and Surveys run -
Daily Report of Well Operations - ~
15. Well Class after proposed work:
Exploratory D
16. Well Status after proposed work:
OilŒ] GasD
DevelopmentŒ]
ServiceD
14. Attachments:
Signature
Garry Catron
Garry Catron
QÁ .L~
~~.
WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
NIA
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact
Printed Name
Title
Production Technical Assistant
Phone 564-4657
Date
2/17/05
Form 10-404 Revised 4/2004
() l~ I G \ N þ~ L
')
)
1-47 AIM-20
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
11/23/04 MIRU CTU #5. KILL WELL W/ 1% KCL. MU/RIH W/ PDS GR/CCL IN CARRIER. TAG 2
7/8" LINER TOP @ 9640' DN/9636' UP. TRY PUMPING DOWN BACKSIDE AND DOWN
COIL. COULD NOT ENTER LINER. POOH. CONTINUED ON 11/24/04 WSR.
11/24/04 CONTINUED FROM 11/23/04 WSR. POOH DUE TO INABILITY TO ENTER LINER W/
PDS GR/CCL IN CARRIER. MU/RIH W/ MEM GR/CCL W/O CARRIER, W/KNUCKLE
JOINT & CNTRLZR. PASS THROUGH LINER TOP, LOG FROM 9800' TO 9400'. PAINT
FLAG. POOH. MU/RIH W/ HALLIBURTON FASDRILL 2-7/8" PLUG. MAKE DEPTH
CORRECTION @ FLAG. WORK THROUGH LINER TOP W/ SOME DIFFICULTIES.
ATTEMP TO SET FASDRILL PLUG @ 9660' (CENTER OF ELEMENT). RIH PAST PLUG.
ATTEMPT RE-SET. POOH. AT SURFACE, STAND BY DUE TO HIGH WINDS.
CONTINUED ON 11/25/04 WSR.
11/25/04 END WEATHER STANDBY. FASDRILL SETTING TOOL LOW-ORDER FIRED, DID NOT
SET PLUG. REDRESS/RIH W/ FASDRILL PLUG. TIE INTO FLAG, SET PLUG @ 9660'.
POOH. TRY TO CIRC-OUT WELL: TUBING TO IA; WHP CLIMBS IMMEDIATELY,
CANNOT MAINTAIN RATE. TRY TO CIRC IA TO TBG, CANNOT MAINTAIN 2.0 BPM,
WHP CLIMBS TO 3 KPSI. BEGIN DEPRESSURING IA TO TANKS. (WHP IS TRACKING).
11/26/04 CONTINUED FROM 11/25/04 WSR. BLEED IA AND BACKSIDE TO 0 PSI. T & IA
COMMUNICATING. SWEEP BACKSIDE/RETURNS UP IA W/ 50 BBL KCU 175 BBLS
INHIBITED KCL. INITIAL RATE OF 1.5 BPM @ 500 PSI. INCREASE RATE TO 2 BPM
AND LEAK RATE DECREASED TO 1 BPM @ 1800 PSI WHP. PRESSURED IA TO 100
PSI. RESUME INHIBITED SWEEP @ 0.9 BPM/900 PSI WHP. LLR IA TO TBG, 1 BPM
@ 308 PSI, CANNOT MAINTAIN 2 BPM. CMIT-TXIA TO 3000 PSI - PASSED.
CONTINUE PUMPING INHIBITED SWEEP @ 1.0 BPM/700 PSI WHP. MU/RIH W/ 2.80"
DRIFT & MEM GR/CCUSPIN LDL BHA. LOG FROM SURFACE TO 9646', STOP
COUNTS AROUND LINER TOP. PAINT FLAG @ 9600'. POOH. LDL SHOWED NO
PROBLEMS ABOVE 2 7/8" LINER TOP. ALL FLUID MOVEMENT IS DOWN FLOW PAST
THE OUTSIDE OF THE 27/8" LINER TOP. MAKE FORWARD PLANS FOR SQUEEZE.
CONTINUED ON 11/27/04 WSR.
11/27/04 Prep for cement job: MU/RIH w/2" BDJSN. Correct depth to flag, 9604'. Tag Fasdrill plug
96601 up wt. Circ tbg to KCL. Pump 21.7 bbls class G cement. Take returns up IA to place
16.7 bbls cement in IA for a calculated cement top in the IA of 8732'. Lay in 5 bbls cement
in backside for a calculated top of 9219'. Leaving balanced plug. Pull to safety, wait 30
mins. RIH to contaminate cement. Could not pass mandrel @ 7957'. did not contaminate
backside cement. FP coil. Begin POOH. Bump IA side of plug by 50 psi increments @ 4.5,
4.75 and 5 hrs on cmeent to 390 psi. No leakage to backside observed.
11/29/04 CTU#5: END WEATHER STANDBY. MIT-IA PASSED TO 3000 PSI. BOP TEST.
MU/RIH W/ MTR & 3.80" PARABOLIC MILL. SOFT TAG @ 9221', HARD CEMENT @
93341. MILL TO 9503'. CONTINUED ON 11/30/04 WSR.
Page 1
)
)
1-47 AIM-20
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
11/30/04 CONTINUED FROM 11/29/04 WSR. RESUME MILLING FROM 9503' - 9631' W/ 3.8"
DSM. MAKING FREQUENT BACKREAM PASSES AND FLOPRO SWEEPS. CHASE TO
SURFACE. MU/RIH W/ 3.80" /1.5" PILOT DSM. SIT DOWN ON BOTTOM 3 GLM'S,
HAVE TO WORK THROUGH. HARD TAG @ 9628'. MILL TO 9636'. POOH. MIT-IA TO
3000 PSI. MU/RIH W/ 1-11/16" MTR, U/D JARS, 2.25" PARABOLIC MILL. MILL FROM
9637.5'-9655'. PUMP FREQUENT FLOPRO SWEEPS. CONTINUED ON 12/1/04 WSR.
12/01/04 CONTINUED FROM 11/30/04 WSR. MILL FROM 9655'-9659' W / 1 11/16"
MOTOR/JARS/2.25" DSM. BACKREAM TO LINER TOP. GOT BIT HUNG. JARRED
FREE. PLUG IS LOOSE. SLIPPING CHAINS. PARTIAL WELL KILL W/ 1% KCL.
INJECTITY IS LOW: 1.4 BPM @ 2700 PSI. FP BACKSIDE. PUMP WARM KCL DOWN
CT. POOH.. RIH WITH 2.23" BULLNOSE JUNK MILL. TAG AT 9954'. STALL SEVERAL
TIMES AND FREE FAST DRILL BRIDGE PLUG. BRIDGE PLUG STUCK TO MILL. PUSH
TO 12893'. UNABLE TO GET DEEPER. POOH TO INSPECT TOOLS. MILL LOOKED
GOOD. MOTOR IS LOCKED UP. CALL FOR ANOTHER MOTOR. CONI' ON WSR
12/02/04 ...
12/02/04 CTU #5, MILL BRIDGE PLUG; CONI' FROM WSR 12/01/04... MU AND RIH WITH
1.69" MOTOR W/ 2.23" 4-BLADE CONCAVE JUNK MILL. WORKED THROUGH LINER
DOWN TO 12890' CTMD. MILLED ON PLUG AND PUSHED TO 13522' CTMD. HAD
EXCESSIVE STALLS WITH LITTLE ADDITIONAL PROGRESS. PLUG IS BELOW
PERFS. ELECT TO CALL IT GOOD AND POOH. FREEZE PROTECT WELL TO 2600'
WITH 60/40 METH. LEFT WELL SHUT IN. NOTIFY WELL TENDER OF STATUS. JOB
COMPLETE.
12/07/04 *** WELL SHUT IN UPON ARRIVAL*** (POST PKR SQZ). SET C-SUB @ 9611' SLM.
PULLED 1 1/2" DGL VIS FROM ST A'S # 6 & 7 AND SET GENERICS.. BRUSHED SSSVN
@1,382' SLM. SET 41/2" BBE (SERIAL# BB-481, STANDARD PACKING) @1,382' SLM..
PERFORMED GOOD CLOSURE TEST. RDMO.. ****LEFT WELL SHUT IN AND
NOTIFIED DSO OF WELL STATUS****
FLUIDS PUMPED
BBLS
763 Methonal I Water
507 1 % KCL
698 1 % KCL wI inhibitor
2520 1 % KCL XS
50 Fresh Water
22 15.8 # cement
73 2# Bio wI 7 ppb Borax
107 FloPro
4740 TOTAL
Page 2
.)
')
:rREE: 4-1/16" / 5000 psi /Cameron-
Otis YHS 10 Actuators
WEllHEAD: 13-5/8" / 5000 psi / FMC (CCl)
RT ELEV= 56'
BF ELEV= 17.2
MAX. DEV. = 81 DEG.
@ 13105' MD
Datum: 9000' TVDss = 9833' MDBKB
10000' TVDss = 12487' MDBKB
113-3/8",68#, NT-80 CYHE BLm H 2496'
SAFETY NOTES: 4-1/2" CHROME
TBG. ALL NIPPLES ARE 9-CHROME
*** TBGTALLYIS 2 PIPE JOINTS OFF
DEPTH - SCHEMATIC IS CORRECT***
END1-47A
1416' l-isssv HES HXO LANDING NIP, ID = 3.813" 1
(I)
~
~
GAS LIFT MANDRELS
TVD DEV "TYPE VLV LATCH PORT DATE
3466 MMG DOME RK 16 12/07/04
5284 MMG SO RK 20 12/07/04
6274 MMG DMY RK 0 08/25/04
6991 MMG DMY RK 0 08/25/04
7685 KBG-2 DMY RK 0
8370 KBG-2 DMY RK 0
8876 KBG-2 DMY RK 0
L
ST MD
7 3471
6 5291
5 6297
4 7105
3 7959
2 8852
1 9505
Minimum ID = 2.441" @
2.7/8" LINER
?'
14-1/2",12.6#, 13-CR-80 NSCT 1
19-5/8" 47# XO, NT-80-S TO NT-95-HS 1
7" 7" BAKER ZXP LINER 7758'
I
.
8732' l-i EST TOP OF CEMENT IN IA 1
1-i4-1/2" HES X NIP, ID = 3.813" 1
l-i 7" x 4-1/2" BAKER S-3 PKR I
1-i4-1/2" HES X NIP, ID = 3.813" 1
1-1 TOP OF 2-7/8" LNR 1
l-i CHEM CUT (DRLR DEPTH - OLD COMPLETION)
l-i OVERSHOT W/ NO-GO UNIQUE, ID = 4.625" I
l-i SB-3 PKR (DRLR DEPTH - OLD COMPLETION)
9574'
9594'
9618'
~
BOTTOM 9 5/8" CASING ( TOP OF WINDOW) 8424
PERFORA TION SUMMA RY
REF LOG:
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
SIZE SPF INTER V AL Opn/Sqz DA TE
4-1/2" 12800 - 12820 0
4-1/2" 13458 - 13478 0
4-1/2" 12930 - 12950 0
7" 11400 - 11404 S
7" 1211 0 - 12114 S
7" 12530 - 12534 S
9646'
9674'
9685'
9683'
Vvv.{
I
.~
~ ~
1 9738' I-iWLEG (DRLR DEPTH - OLD COMPLETION) I
I 10250' l-i ESTIMATED WC TOP OF CEMENT 1
I 11329' 1-14-1/2" X 7" BAKER HMC HGR 1
I
\
12-7/8" LNR, 6.6#, 13-CR-60 I
7" 29#/ft Hydrill 511 12582
r 13522' 1-i2-7/8"FASTDRILLBRIDGEPLUG 1
PBTD 13909'
4.5" 12.6#/ft L-80 HYDRIL 511 14070'
REV BY COMMENTS
JAFfTLP TOC, CHEM CUT, CORRECTIONS
RWLfTLP GL V C/O
REV BY COMMENTS DA TE
DAV INITIAL COMPLETION & PERF$12/02/04
JWS RWO TBG AND ADD LNR 12/07/05
DAV ADD PERF
DBR ADD 7" LA P, SOl PERFS
RMHlTLP GL V C/O
CAO/TLH CORRECTIONS
ENDICOTT UNrr
WB..L: 1-47A/M-20
PERMrr No: 1972030
API No: 50-029-21625-01
SEC 36, T12N, R16E, 3133' FSL & 2168' FB..
DATE
01/17/97
06/11/01
03/09/98
11/08/00
08/23/04
1 0/20/04
. BPExploration (Alas ka)
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Well
fðl·o{.}/YJ-47/Q-35
, ~. . 4-02/Q-28
; <j 'g -oU.2-38/SN-01
/91)- /Z.C¡ 2-14/0-16
'~~"'I'fq 3-27/M-33
f?k-OfJ. 1-27/P-20
t?!-ðr/I1-47A1M-20
/11-20'þ 1-47A/M-20
10'7 .1-47A1M-20
¡ (- Þ.;,
)'l7 ~ 1.(; ?
Job#
10830798
10621807
10724419
10913858
10913851
10893049
10621821
10621821
10900105
INJECTION PROFILE
LEAK DETECTION LOG
LEAK DETECTION LOG
LEAK DETECTION LOG
PROD PROFILE/DEFT
LEAK DETECTION LOG
LEAK DETECTION LOG
LEAK DETECTION LOG
LEAK DETECTION LOG
Log Description
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage. Alaska 99508
Date Delivered:
)
Illiof'!
c""" !lOP
,~r:;},NN~'v ,,I ,;
,:¿, ~1 ;t.., ~,
Date
05/02/04
07/12/04
07/19/04
10/23/04
09/30/08
10/19/04
09/08/04
09/09/04
10/11/04
¿, 0 I)nn5.
j ð b~"::i~
11/18/04
NO. 3258
t'f7~~8dJ3
þ- Lþ 7 t+-þ~
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Endicott
Blueline
1
1
1
1
1
1
1
1
1
Color
Prints
CD
-
-----'
Alaska Data & Consulting Services
2525 Gambell Street,puite 400
A~horage, A;1,9 ~63-2838 / - r.
N: seth-- / /;
-- \ ' "J /
\.. ¡ ~ ;/, - /
Ce¡Ved by. ì t:br.,c J - ~~.A/-
V()
STATE OF ALASKA ....
ALASKA OiL AND GAS CONSERVATION COMM,...,ION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
2.' Name'of'operator ......................................................
BP Exploration (Alaska) Inc.
3. 'AddresS ...................................................... ~ ......... .....
P.O. Box 196612, Anchorage, Alaska 99519-6612
4'.' LOCatiOn of wel'! at surface .................................. ,.,
2146, SNL, 2169' WEL, SEC. 36, T12N, R16E, UM
At top of productive interval
1635' SNL, 492' EWL, SEC. 31, T12N, R17E, UM
At effective depth
1834' SNL, 1809' EWL, SEC. 31, T12N, R17E, UM
At total depth
1876' SNL, 1933' EWL, SEC. 31, T12N, R17E, UM
, ,,
' r'! Operation Shutdown !"i S'iimulate i-I Plugging !~ Perforate
I~ Puli Tubing r'l Alter Casing !~! Repair Well r-! Other
~5'.'' ~;~3e cf well: ......
I~ Development
r-I Exploratory
g Stratigraphic
r'l service
12. Present well condition summary
Total depth: measured
true vertical
14075 feet Plugs (measured)
10357 feet
Effective depth' measured 13942 feet Junk (measured)
true vertical 10334 feet
6. Datum EleVaiion (DF or KB)- '-
KBE = 55.2'
7. Unit or Pr°perty N~me
Duck Island Unit/Endicott
'8. WelI N,mb~i .................
1-47NM-20
~)'. P(~'rmii Numbe"r I ApproVal
197-203
'10. APl N'u~nber' ....
50- 029- 21625-01
~1 Fieldand P°ol ' ''
Endicott Field / Endicott Pool
Cas lng Length Size Cement ed M D TV D
Structural
Conductor 107' 30" Driven 107' 107'
Surface 2496' 13-3/8" 2362 cu. ft. Permafrost 2496' 2493'
Intermediate 8429' 9-518" 298 cuft Class 'G' 8429' 8050'
Production
Liner 4824' 7" 425 cu. ft. Class 'G' 7758' - 12582' 7527' - 10086'
Liner 2755' 4-1/2" 392 cu ft. Class 'G' 11318'- 14073' 9562'- 10357'
Scab Liner 4342' 2-7/8" 202 cuft Class 'G' 9639' - 13982' 8965' - 10341'
Perforation depth: measured 12846' - 12866', 12885' - 12905', 12800' - 12820', 12930' - 12950', 13458' - 13478'
true vertical 10152' - 10157', 10161' - 10165', 10142' - 10147', 10170' - 10174', 10255' - 10258'
Tubing (size, grade, and measured depth)
4-1/2", 12.6#, 13Cr80 NSCT tubing to 9685' (with overshot)' 4-1/2", 12.6#, L-80 9676'-
9739'
Packers and SSSV (type and measured depth) 7" Baker 'SB-3' packer at 9683;' 7" Baker 'S-3' packer to 9595'; 7" Baker 'ZXP' packer
at 7758" SSSV Landing Nipple at 1417'
R'"EC E I'V D
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
,JUL 13 2001
14'
........... Representati~ Daily' Average Production Or in'jection Data
OiI-Bbl Gas-Mcf Water-Bbl
.~,laska 0il & Gas Cdns, C0mmissi¢~
...... An'chorage ' "
Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation'
15. AttaChments "' ' "' ' ...... "!'i"6'. status' 0f'~eil ;:lassi~i~at'ions a's: ......
r'l Copies of Logs and Surveys run I! I~ Oil r-I Gas I-] Suspended Service
l~ Daily Report of Well Operations
!
17. 'i 'heieb~' Ceriif:y ihat'ti~e' f~r'egoing is'tiue"a~'d C°i;~ct' {(~'the'bes'{' (~f my' kns~vi;~dg~ ............
Form 10-404 Rev. 06/15/88
Title Technical Assistant Date 0/7''/~ °Oj
'' SOA~~~~/~~r~~dra ste~man;'564_4750
0~~'--'~ ~~ ~ ~ [ 5~ k& ~.., ('"~ ~ ~t~i A ~' ~- . r.; - Submit In Duplicate,~
Legal Well Name' 1-47A/M-20 ,,-IUL 1~2001
Common Well Name: 1-47A/M-20 Spud Date: 1511987
Event Name' WORKOVER Start: 5t24t2001 Ala~g~ll & ~s ~20~mission
Contractor Name: DOYON Rig Release: 6/9/2001 Anchorage
Rig Name: DOYON 15 Rig Number:
!~i ~~ i!i ii""i""'~'~ii"~'"'"'~'i ~~ ii'~i~!'~'"i~'~'""!!'"'"'~"~ ........... i'"'"'i'ii"~'~"~!~'~ ....... "' ':'' Description of Operations
,, ,
5/25/2001 00:00 - 11:30 11.50 RIGU P PRE Move from MPI 2-06/J-22 to MP! 1-47NM-20.
11 '30- 12:00 0.50 RIGU P PRE Slide rig floor over well.
12:00 - 14:00 2.00 RIGU P PRE Rig up. Accept rig for operations at 14:00 5-25-2001. Take on
370 bbl 9.2 filtered brine.
14:00 - 15:30 1.50 RIGU P PRE Rig up Drill Site Maintance lubricator. Pull BPV. 500 psi on
tubing and 190 psi on annulus.
15:30 - 18:00 2.50 RIGU P PRE Rig up to circulate well down tubing, back out through annulus
and choke manifold. Bleed off tubing and annulus to bleed
trailer.
18:00 - 22:30 4.50 RIGU P PRE PJSM, Fill gas buster and check hookups. Circulate well for
two hole volumes. 900 psi at 6 bpm. No losses. Open both
sides, No flow.
22:30 - 23'00 0.50 RIGU P PRE Flow check well. Rig up to install TVVC.
23:00 - 23:30 0.50 RIGU P PRE Install TWC and test 1000 psi top and 300 psi backside.
23:30 - 00:00 0.50 RIGU P PRE Bleed down control lines and prepare to ND Tree.
512612001 00:00 - 00:30 0.50 RIGU P PRE Pressure test TWC with 1000 psi from top and 300 psi from
bottom. Both held with out loss for 10 minutes.
00'30 - 01:30 1.00 RIGU P PRE Nipple down and remove tree and adapter flange.
01:30 - 06:00 4.50 RIGU P PRE Nipple up BOPE and flow line. Prepare to test.
06:00 - 16:00 10.00 RIGU P PRE Pressure test BOPE. Test lower rams with 3 1/2" test joint.
Upper rams and annular with 5" test joint. Rams, valves etc to
250~3500 psi. Annular to 250~2000 psi. John Spaulding of
AOGCC waived witnessing of BOPE test. BOP test was done
with annulus valve closed, Pressure increased to 425 psi on
annulusi at end of test.
16:00 - 21:00 5.00 RIGU N SFAL PRE Nipple down flowline and nipple up shooting flange on top of
annular.
21:00 - 23:00 2.00 RIGU N SFAL PRE Pressure test annulus lines to 3500 psi, no visable leaks.
Pressure test stack and lubricator to 3500 psi for 10 minutes.
Two attempts with rig pump failed. Successful when isolating
stack and using test pump.
23:00 - 23:30 0.50 BOPSUR N SFAL DECOMP Attempt to pull TWC with lubricator and Drill Site Maintenance.
Could not screw into TWC. RD and remove lubricator.
23:30 - 00:00 0.50 BOPSUR N SFAL DECOMP Pickup a stand of 3 1/2" DP. Screw into top drive and wash
hanger, recovered rust scale and a piece of rubber from rams
while circulating. Stand back DP.
512712001 00:00 - 00:30 0.50 WHSUR N DPRB DECOMP Finished washing TWC and stood back stand in derrick.
00:30 - 01:30 1.00 WHSUR N DPRB DECOMP Rigged up DSM lubricator. Pulled TWC. 550 psi on tubing and
annulus. Bled off tubing through choke. Tubing and annulus
dropped to zero.
01:30 - 03:30 2.00 KILL N DPRB DECOMP Reverse circulated a complete hole volume of 9.2 ppg brine
through choke and gas buster.
03:30 - 04:00 0.50 KILL N DPRB DECOMP Monitor well in cellar while rigging down DSM lubricator.
04:00 - 06:00 2.00 RIGU N DPRB DECOMP Nipple up bell nipple and flowline while monitoring annulus in
cellar. No flow.
06:00 - 09:30 3.50 KILL N DPRB DECOMP PJSM- Open well and observed gas breaking out of fluid in bell
nipple. Reverse circulated entire hole volume. Gas breaking
out and bubbling in bell nipple. Set off gas alarms in shaker
a., a&I ~ .~ , ,,
1/2001 2:49:35 PM
Legal Well Name: 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date: 7/15/1987
Event Name' WORKOVER Start: 5/2412001 End: 6/9f2001
Contractor Name: DOYON Rig Release: 6/9t2001
Rig Name' DOYON 15 Rig Number:
5/27/2001 06:00- 09'30 3.50 KILL N DPRB DEGOMP room.
09:30- 10:00 0.50 KILL N DPRB DEGOMP Monitorweli. No flow.
10:00- 10:30 0.50 KILL N DPRB DECOMP Conducted pressure test on wellbore. Closed blind rams and
test wellbore to 550 psi. Pressure declined from 550 psi to 525
psi in 10 minutes. Took 1.3 bbls to pressure test formation.
Bled off pressure.
10:30 - 13:30 3.00 KILL N DPRB DECOMP Reverse circulated 9.5 ppg viscosified brine down annulus and
displaced 9.2 ppg brine out of wellbore.
13:30- 15:30 2.00 KILL N DPRB DECOMP Monitor well. No flow.
t5:30 - 19:00 3.50 KILL N DPRB DECOMP Reverse circulated bottoms up. Gas breaking out in bell nipple
500 strokes before bottoms up. Continued circulating and
raising weight to 9.7 ppg.
19'00 - 21:00 2.00 KILL N DPRB DECOMP Monitor well Began to get gas bubble after about 20 minutes,
21'00 - 00:00 3.00 KILL N DPRB DECOMP Reverse circulate bottoms up (2050 stks). High gas cut began
at 700 strokes and increased to 1700 strokes where the well
leveled out. Bottoms up good. Continue to circulate and
'ncrease weight to 9.9 ppg.
5/28/2001 00:00 - 01:00 1,00 KILL N DPRB DECOMP Circulate 9.9 ppg brine at 7 bpm at 925 psi with no losses.
01:00 - 03:00 2.00 KILL N DPRB DECOMP Monitor well for flow.
03:00 - 03'30 0.50 KILL N DPRB DECOMP Reverse circulated bottoms up and had gas breaking out of
mud with bottoms up. Too much gas to pull pipe.
03:30 - 04:00 0.50 KILL N DPRB DECOMP Close blinds and pressure tested well to 500 psi. Lost 50 psi to
450 psi in 10 minutes. EMW at top of perfs 10.8 ppg. Pressure
up to 500 psi with 1.5 bbls of brine. Bled off pressure.
04:00 - 06:30 2.50 KILL N DPRB DECOMP Reverse circulated and raised brine weight from 9.9 ppg to 10.2
PPg.
06:30 - 08:30 2.00 KILL N DPRB DECOMP Monitor well for 2 hours. No flow. Gas breaking out of brine.
08:30 - 11:30 3.00 KILL N DPRB DECOMP Reverse circulated and continue to have gas breaking out in
bell nipple 500 strokes early. Too much gas to lay down tubing.
Continued circulating and raising brine weight to 10.5 ppg.
11:30- 14:30 3.00 KILL N DPRB DECOMP Mon itor well for flow.
14'30 - 15:30 1.00 KILL N DPRB DECOMP Reverse circulated bottoms up. Gas appears to be decreasing.
15:30 - 16:00 0.50 KILL N DPRB DECOMP Conducted pressure test on wellbore. Closed blinds and
pressured up to 300 psi on wellbore. Pressure decreased to
290 psi in 10 minutes. Using 10100' TVD gives an EMW to
11.1 ppg.
16:00 - 18'30 2.50 KILL N DPRB DECOMP Reverse circulated well and raised brine weight to 10,7 ppg,
18:30 - 20:30 2.00 KILL N DPRB DECOMP Monitor well
,~g,/'"~l'~ll~lCL) ,Ji,,Ji,t ~, ~ i~i~1L6/11/2001 2:49:35 PM
..........
Legal Well Name' 1-47A/M-20
,Common Well Name: 1-47A/M-20 Spud Date: 7/15/1987
Event Name' WORKOVER Start: 5/2412001 End' 6/9/2001
Contractor Name' DOYEN Rig Release: 6/9f2001
Rig Name: DOYEN 15 Rig Number:
:i i~i~ i!~~ ! ~~ii i;iiii~~~I : ;:: : DeScription of Operations
5/28/2001 20:30- 21:30 1.00 KILL N DPRB DECOMP Reverse circulate bottoms up to monitor gas. Some light mud
and gas as before but much less.
21:30- 22:30 1.00 KILL N DPRB DECOMP Monitor well
22:30 - 23:00 0.50 PULL P DECOMP Rig up 3 1/2" drill pipe and XO. Screw into hanger. Back out
lock down screws, PU tubing at 170K, Work tubing to 270k
without coming free. Pull to 200k and lock down brake.
23:00 - 00:00 1.00 PULL P DECOMP Circulate conventionally. Pipe came free and hanging at 170K.
5/29/2001 00:00 - 01'00 1.00 PULL P DECOMP Circulating down tubing. Hang 200k on hook while circulating.
Pipe parted and left 170K on hook. Circulated up sand from
behind pipe. Previously taking 575 psi at 50 strokes per
minute. Now taking 350 psi for 50 strokes per minute. No
appreciable amount of gas during circulation.
01'00 - 03:00 2.00 PULL P DECOMP Monitor well.
03:00 - 04:30 1.50 PULL P DECOMP Circulate bottoms up at 70 spm and 500 psi. No gas. Rig up
Camco control line spool.
04:30 - 05:00 0.50 PULL P DECOMP Pull hanger to floor, cut control lines and lay down hanger. Tool
service present to NORM pipe. OK
05:00 - 06:00 1.00 PULL P DECOMP Check well for flow and lay down 11 joints 4 1/2" tubing.
06:00 - 09:00 3.00 PULL P DECOMP Lay down tubing, control line and SSSV.
09:00 - 10:00 1.00 PULL P DECOMP Rig down Camco spool and set off floor. Flowcheck well.
10:00 - 11'00 1.00 PULL P DECOMP Change elevators, pu XO to 3 1/2" DP. RIH to 9654'. 16
stands, screw into top drive.
11:00 - 13'00 2.00 PULL P DECOMP circulate at 50 spin 5 bpm one well volume. No significant gas.
13:00 - 13:30 0.50 PULL P DECOMP Flowcheck.
13:30 - 14:30 1.00 PULL P DECOMP Pull out of hole with drill pipe wet.
14:30 - 15:00 0.50 PULL P DECOMP Flow check and pump slug.
15:00 - 18:00 3.00 PULL P DECOMP Pull out of hole laying down tubing. Hole taking proper fluid.
18'00 - 20:15 2.25 PULL P DECOMP Pull out of hole laying down tubing. Hole taking proper fluid.
20:15 - 21:00 0.75 PULL P DECOMP Roustabout recieved cut on left thumb handling gas lift
mandrel. Shut down to take to medic, evaluate hazard and
work up a solution to assure it won't happen again. Will put
thread protectors on the 3 remaining gas lift mandrels.
21:00 - 23:00 2.00 PULL P DECOMP lay down rest of 4 1/2" tubing, recovered SSSV, 7 GLM's, 231
jts tubing, X nipple and 4" of pup. Well standing dead.
23:00 - 00:00 1.00 PULL P DECOMP Rig down casing handling equipment. Clear floor. RU to PU
Overshot assembly.
5/30/2001 00:00 - 00'30 0.50 PULL P DECOMP R / D TUBING HANDLING EQUIPMENT. R / U TO RIH WITH
3-1/2" D.P. MONITORED WELL, WELL STATIC.
00:30 - 01:00 0.50 PULL P DECOMP RAN AND SET WEAR BUSHING.
01'00 - 02:00 1.00 PULL P DECOMP HELD PJSM. M / U BHA, UNIQUE OVERSHOT W/PUP JT, 1
JT OF 3-1/2" D.P. AND CASING SCRAPER.
02'00 - 07:00 5.00 PULL P DECOMP RIH W/3-1/2" D.P. TO 4,603'. P / U 144 JTS.
07:00 - 10:00 3.00 PULL P DECOMP HELD PJSM. RIH W/3-1/2" D.P. FROM DERRICK FROM
4,603' TO 9,665'.
10:00 - 10:30 0.50 PULL P DECOMP M / U TOP DRIVE AND WASHED DOWN FROM 9,665' TO
9,676'. TAGGED UP ON TUBING STUMP AT 9,676'. PUMP
RATE 3 BPM @ 450 PSI. ROTATED STRING AND
DROPPED OVERSHOT OVER TUBING STUMP. SPP
INCREASED TO 525 PSI. WASHED DOWN TO 9,682'.
TAGGED UP ON TUBING STUMP W/NO-GO AT 9,682' W/
3,000#, SPP INCREASED TO 900 PSI.
10:30- 12:00 1.50 PULL P DECOMP PULLED UP OFF OF TUBING STUMP. CIRCULATED
BOTTOMS UP. PUMP RATE 7 BPM, SPP 1,500 PSI. NO GAS
~ .... ,~ ~ al~ _'_-_-_ ~_ ~, ,,
6/11t2001 2:49:35 PM
Legal Well Name' 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date: 7/15/1987
Event Name: WORKOVER Start: 5/24/2001 End' 6/9/2001
Contractor Name' DOYON Rig Release' 6/9/2001
Rig Name: DOYON 15 Rig Number:
5/30/2001 10:30- 12:00 1.50 PULL P DECOMP OBSERVED ON BOTTOMS UP.
12:00- 13:00 1.00 PULL P DECOMP MONITORED WELL, WELL STATIC. HELD PJSM.
13:00 - 22:30 9.50 PULL P DECOMP POOH, L / D 306 JTS OF 3-1/2" D.P. CALCULATED FILL 50
BBLS, ACTUAL FILL 53 BBLS.
22:30 - 23:00 0.50 RUNCOI~ COMP PULLED WEAR BUSHING. MONITORED WELL, WELL
STATIC.
23:00 - 00'00 1.00 RUNCOI~ COMP HELD PJSM. RIGGED UP EQUIPMENT TO RUN 4-t/2"
CHROME TUBING.
5/31/2001 00:00- 01'30 1.50 RUNCOI~ COMP HELD PJSM. RIGGED UP COMPENSATOR AND
EQUIPMENT TO RUN 4-1/2" CHRQME TUBING.
01 '30 - 03:30 2.00 RUNCOrt~ COMP M / U 4-1/2" CHROME TUBING TAIL PIPE AND 7"x 4~1/2"
PACKER.
03:30 - 19:30 16.00 RUNCOPP COMP RIH w/PACKER AND TAIL PIPE ON 4-1/2" 12.6# 13CR80
NSCT TUBING. TOTAL JOINTS IN THE HOLE 204. RAN A
3.833" DRIFT ON HALLIBURTON SLICK LINE EVERY 35
JOINTS.
NOTE- HELD PJSM ON BOTH CREWS PRIOR TO RUNNING
TUBING. AFTER RUNNING 10 JOINTS ON EACH TOUR
ANOTHER PJSM WAS HELD TO REVIEW EACH JOB AND
MAKE NECESSARY ADJUSTMENTS AND CHANGES FOR
SAFER JOB PERFORMANCE.
19:30 - 20:30 1.00 RUNCOi~ COMP MADE UP SSSV AND CONTROL LINES. TESTED CONTROL
LINES TO 5,000 PSI FOR 10 MINUTES, OK.
20:30 - 00:00 3.50 RUNCOi~P COMP RIH w/4-1/2" 12.6# 13CR80 NSCT TUBING AND CONTROL
LINE. INSTALLED 1 BAND ON EVERY JOINT TO HOLD
CONTROL LINE. TOTAL JOINTS IN THE HOLE 238. RAN A
3.833" DRIFT ON HALLIBURTON SLICK LINE TO TOP OF
SSSV.
6II/2001 00:00 - 01 '00 1.00 RUNCOI~P COMP R / D COMPENSATOR.
0t '00 - 02:00 1.00 RUNCOr~ COMP CHANGED OUT ELEVATORS, P / U 3 JTS 3-1/2" DP AND
TIW VALVE, TST'D TIW VALVE TO 2,000 PSI. WASHED
DOWN TO TAG TUBING STUMP WITH "NO-GO" IN
OVERSHOT. PUMP RATE 3 BPM, SPP 225 PSI.
SWALLOWED STUMP WITH OVERSHOT AT 9,681', SPP
INCREASED TO 600 PSI. TAGGED UP w/"NO-GO" AT
9,687', SPP INCREASED TO 900 PSI, SET DOWN 3,000# ON
TOP OF STUMP. SHUT DOWN PUMPS AND PULLED UP
OFF OF TUBING STUMP.
02:00 - 02:30 0 50 RUNCOI~/P COMP BLEW DOWN TOP DRIVE, L / D 3-1/2" DP AND TIW VALVE.
02:30 - 04:30 2.00 RUNCOI~ COMP R / U COMPENSATOR, L / D JT#238, M / U 3 - 4-1/2"
PUPJTS, 19.55' - 9.86' - 6.11' M / U JT#238, P / U & M / U
TBG HNGR AND CONTROL LINES. TESTED CONTROL
LINES TO 5,000 PSI FOR 10 MINUTES OK.
NOTE: TUBING WILL BE SPACED OUT w/"NO-GO" IN
OVERSHOT 2' ABOVE TOP OF TUBING STUMP.
04:30 - 08:30 4.00 RUNCOI~/P COMP HELD PJSM w/CREW AND PEAK DRIVERS. R / U AND
,,
Legal Well Name: 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date: 7/1511987
Event Name: WORKOVER Start: 512412001 End: 6/9/2001
Contractor Name: DOYON Rig Release: 6t9/2001
Rig Name: DOYON 15 Rig Number:
;6/1/2001 04:30 - 08:30 4.00 RUNCOI~ I=' COMP REVERSE CIRCULATED PACKER FLUID DOWN ANNULUS.
PUMP RATE 3 BPM, SPP 800 PSI.
08:30 - 09:30 1.00 RUNCOI~P COMP R / D CIRCULATING LINES. LANDED TUBING HANGER
AND ENGAGED LOCK DOWN SCREWS. FMC TORQUED
EACH LDS TO SPECS.
COMPLETION EQUIPMENT SET AT THE FOLLOWING
DEPTHS:
ITEM LENGTH
DEPTH
OVERSHOT 16.17'
9,685.00'
1 JT 4-1/2" 12.6# 13 CR TBG 39.49'
9,629.34'
X NIPPLE ASSEMBLY 20.89'
9,608.54'
7" x 4-1/2" PKR ASSEMBLY 23.50'
9,585.04'
X NIPPLE ASSEMBLY 20.66'
9,564.38'
1 JT 4-1/2" 12.6# 13 CR TBG 39.12'
9,525.26'
#1 GLM ASSEMBLY 26.19'
9,499.07'
15 JTS 4-1/2" 12.6# 13 CR TBG 630.16'
8,868.91'
#2 GLM ASSEMBLY 26.25'
8,842.66'
22 JTS 4-1/2" 12.6# 13 CR TBG 866.63'
7,976.03'
#3 GLM ASSEMBLY 26.39'
7,949.64'
21 JTS 4-1/2" 12.6# 13 CR TBG 825.73'
7,123.91'
¢/4 GLM ASSEMBLY 28.14'
7,095.77'
20 JTS 4-1/2" 12.6# 13 CR TBG 779.60'
6,316.17'
#5 GLM ASSEMBLY 28.72'
6,287.45'
25 JTS 4-1/2" 12.6# 13 CR TBG 977.27'
5,310.18'
#6 GLM ASSEMBLY 28.37'
5,281.81'
46 JTS 4-1/2" 12.6# 13 CR TBG 1,791.89'
3,489.92'
#7 GLM ASSEMBLY 28.21'
3,461.71'
52 JTS 4-1/2" 12.6# 13 CR TBG 2,032.28'
1,429.43'
SSSV ASSEMBLY 22.55'
1,406.88'
Printed: 6/11/2001 2:49:35 PM
8CANNED JUN 2002
Legal Well Name' 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date: 7/15/1987
Event Name: WORKOVER Start: 5/24/2001 End: 6/9/2001
Contractor Name: DOYON Rig Release: 6/9/2001
Rig Name: DOYON 15 Rig Number:
611/2001 08:30- 09:30 1.00 RUNCOI~ COMP 33 JTS 4-1/2" 12.6# 13 CR TBG 1,290.53'
116.35'
I PUP JT 4-1/2" 12.6# 13CR TBG 19.55'
96.80'
1 PUP JT 4-1/2" 12.6# 13CR TBG 9.86'
86.94'
1 PUP JT 4-1/2" 12.6# 13CR TBG 6.11'
80.83'
1 JT 4-1/2" 12.6# 13CR TBG 39.50'
41.33'
TUBING HANGER 3.80'
37.53'
09:30 - 11:00 1.50 RUNCOI~/P COMP HELD PJSM. R / U HOWCO SLICKLINE. RIH w/SLICKLINE
lAND PULLED SSSV DUMMY SLEEVE. POOH w/SLICKLINE
AND SLEEVE.
11:00 - 13:00 2.00 RUNCOr~ COMP M / U DRIFT ASSEMBLY - BAKER 2-7/8" STL BULLET NOSE
FLOAT SHOE - 2-7/8" SLT 10' PUP- INTEGRAL STL
TURBOLATOR w/3-1/2" OD FINS - XO, RAN DRIFT
ASSEMBLY ON SLICKLINE. DRIFT ASSEMBLY PASSED
THROUGH OVERSHOT AND TUBING STUMP - OK.
MAXIMUM DRIFT DEPTH, 9,828'- INCL 72 deg. POOH w/
DRIFT ASSEMBLY.
13:00 - 16:00 3.00 RUNCOI~'~ COMP M / U XX PLUG AND RAN IN HOLE ON SLICKLINE. SET XX
PLUG IN X NIPPLE IN TAIL PIPE. XX PLUG SET AT 9,582'
WLM. POOH w/SLICKLINE.
16:00 - 17:00 1.00 RUNCOI~ P COMP RIH w/SLICKLINE AND SET SSSV DUMMY SLEEVE. POOH
w/ SLICKLINE.
17:00 - 17:30 0.50 RUNCOI~tP COMP HELD PJSM. M / U XO - TIW VALVE - PUMP IN SUB.
TESTED LINES TO 3,500 PSI FOR 10 MINUTES, OK. BLED
OFF PRESSURE.
17:30- 18:00 0.50 RUNCOI~ COMP PRESSURED UP ON TUBING TO 2,500 PSI TO SET SLIPS,
INCREASED PRESSURE TO 3,500 PSI TO SET PACKER
ELEMENT. PRESSURE TESTED TUBING TO 3,500 PS! FOR
30 MINUTES, OK.
18:00 - 18:30 0.50 RUNCOI~ COMP BLED TUBING PRESSURE DOWN TO 2,000 PSI. RIGGED
UP TO TEST ANNULUS. CHECKED TORQUE ON LDS, OK.
18:30- 20:00 1.50 RUNCO~' COMP PRESSURE TESTED 9-5/8"-7" x 4-t/2" ANNULUS TO 2,500
PSI. HELD FOR 30 MINUTES, OK.
20:00 - 21:00 1.00 RUNCOI~ ~ COMP R / D HOWCO SLICKLINE, CAMCO CONTROL LINE
SPOOLS AND CLEARED FLOOR OF ALL TUBING
EQUIPMENT.
21:00 - 21:30 0.50 RUNCOI~ COMP RAN AND SET TWC AND TESTED TO 1,000 PSI. OK.
21:30 - 00:00 2.50 RUNCOi~/P COMP N / D AND PICKLED 13-5/8" BOP STACK.
6/2/2001 00:00 - 08:00 8.00 BOPSUF; P COMP HELD PJSM. N / D AND PICKLE 13-5/8" BOP STACK.
REMOVED RISER SPACER SPOOL AND DSA.
08:00- 09:00 1.00 WHSUR P COMP ATTACHED CONTROL LINES TO OUTLET PORTS AND
TESTED TO 5,000 PSI. OK.
09:00 - 10:00 1.00 WHSUR = COMP N / U FMC 13-5/8" x 4-1/6" 5M TUBING HEAD ADAPTER.
TESTED TUBING HEAD ADAPTER AND TUBING HANGER
TO 5,000 PSI. OK.
10:00 - 21:00 11.00 BOPSUR P COMP HELD PJSM. N / U 7-1/16" SPACER SPOOL w/ADAPTER
FLANGE, RISER, 7-1/16" BOP STACK, BELL NIPPLE, FLOW
LINE AND CONTROL, CHOKE AND KILL LINES. 2-7/8"
,,,
Printed: 6/11/2001 2:49:35 PM
' CANNED JUN & 2002
. ....................... . .......
Legal Well Name: 1-47A/M-20
Common Well Name' 1-47A/M-20 Spud Date: 7/1511987
Event Name: WORKOVER Start: 5/24f2001 End' 6/912001
Contractor Name: DOYON Rig Release: 6/9/2001
Rig Name' DOYON 15 Rig Number:
6/2/2001 10:00 - 21:00 11.00 BOPSUF P COMP RAMS IN TOP, 2-3/8" RAMS IN BOTTOM. CHANGED OUT
TO 2-3/8" SAVER SUB AND DIES ON TOP DRIVE.
ADJUSTED TOP DRIVE AND EQUIPMENT TO TTRD MODE.
21:00- 00:00 3.00 BOPSUF P COMP TESTED BOPE.
6/3/2001 00:00- 03:00 3.00 BOPSUF P COMP TESTED BOPE. TESTED PIPE RAMS, CHOKE LINE, KILL
LINE, CHOKE MANIFOLD, STAND PIPE, TIW VALVES AND
ALL SURFACE EQUIPMENT TO 3,500 PSI HIGH / 250 PSI
LOW. TESTED ANNULAR TO 2,000 PSI HIGH / 250 PSI
LOW. HIGH PRESSURE TESTS HELD FOR 10 MIN, LOW
PRESSURE TESTS HELD FOR 5 MIN. ALL PRESSURE
TESTS HELD w/NO LEAKS OR PRESSURE LOSS.
03:00 - 03:30 0.50 BOPSUR P COMP PULLED TEST PLUG AND RIGGED DOWN BOPE TEST
EQUIPMENT.
03:30- 04:00 0.50 BOPSUR P COMP HELD PJSM. PULLED BELL NIPPLE.
04:00 - 04:30 0.50 BOPSUF P COMP HELD PJSM. RIGGED UP LUBRICATOR w/DSM. PULLED
TWC. RIGGED DOWN LUBRICATOR.
04:30 - 08:00 3.50 PULL P COMP HELD PJSM. RIGGED UP HOWCO SLICKLINE. RIH AND
RETRIEVED SSSV ISOLATION SLEEVE. POOH w/
SLICKLINE AND SLEEVE.
08'00 - 12:00 4.00 PULL N DPRB COMP M / U X- EQUALIZING TOOL ON SLICKLINE AND RAN IN
HOLE. TOOL STOPPED AT 9,550', PLUG SET AT 9,582'.
POOH w/SLICKLINE, CHECKED X-EQUALIZING TOOL.
RE-ZEROED DEPTH GAUGE AND RAN IN HOLE. TOOL
STOPPED AT 9,550'. POOH w/SLICKLINE.
12:00 - 13:30 1.50 PULL N DPRB COMP M t U BAILER ON SLICKLINE AND RAN IN HOLE. BAILED
FROM 9,550' TO 9,553'. POOH, BAILER FULL OF SALT.
13:30 - 15:00 1.50 PULL N DPRB COMP MADE 2nd BAILER RUN. BAILED FROM 9,553' TO 9,555'.
POOH, BAILER FULL OF SALT. 30' SALT FILL ON TOP OF
XX PLUG.
15:00 - 16:00 1.00 PULL N DPRB COMP R / D HOWCO SLICKLINE AND LUBRICATOR.
16'00 - 17:00 1.00 PULL N DPRB COMP HELD PJSM. R / U AND INSTALLED BELL NIPPLE,
FLOWLINE, HOSES AND POLLUTION PAN.
17:00 - 20:00 3.00 PULL P COMP HELD PJSM. R / U 2-3/8" DP HANDLING EQUIPMENT AND
BELLY BOARD.
20:00 - 20:30 0.50 PULL P COMP HELD PJSM. M / U BHA, 2-7/8" MULE SHOE - XO.
20:30 - 00:00 3.50 PULL P COMP RIH w/BHA ON 2-3/8" DP. P / U SINGLE JOINTS OUT OF
THE PIPE SHED.
HELD PJSM w/CREW PRIOR TO P / U AND RUNNING
DRILL PIPE. AFTER P/U AND RUNNING 30 JOINTS
ANOTHER PJSM WAS HELD TO REVIEW EACH JOB AND
MAKE NECESSARY ADJUSTMENTS AND CHANGES FOR
SAFER JOB PERFORMANCE.
6/4/2001 00:00 - 08:30 8.50 CLEAN P COMP HELD PJSM. P / U 300 JTS OF 2-3/8" DP RAN IN HOLE TO
9,500'.
08:30 - 09:00 0.50 CLEAN N DPRB COMP BROKE CIRCULATION AND ESTABLISHED PARAMETERS.
09:00 - 10:30 1.50 CLEAN N DPRB COMP WASHED IN HOLE FROM 9,500' TO 9,578'. PUMP RATE 3
BPM, SPP 2,400 PSI. TAGGED TOP OF XX PLUG AT 9,578'
DP MEASUREMENT.
10:30 - 11:00 0.50 CLEAN N DPRB COMP HELD PJSM. RIGGED UP EQUIPMENT TO REVERSE
Printed: 6/11t2001 2:49:35 PM
SGANNED JUN
Legal Well N~me: 1-47A/M-20
Gommon Well Name' 1-47A/M-20 Spud Date: -//16/1987
Event Name: WORKOVER Start: 5/24/2001 End' 6/9/2001
Contractor Name' DOYON Rig Release: 6/9/2001
Rig Name: DOYON 15 Rig Number:
~:'~ :~'i~ :'~iiil iiI ~~:~'iii:i~ii~ili!!'::~~i!iii: ~i i!i!i; !:i: i::i!ii::~ i~:: Description of Operations
61412001 10:30- 11:00 0.50 CLEAN N DPRB COMP CIRCULATE.
11:00- 13:00 2.00 CLEAN N DPRB COMP REVERSE CIRCULATED UNTIL RETURNS OVER SHAKER
WERE CLEAN. PUMP RATE 3 BPM, SPP 3,000 PSI.
13:00 - 13'30 0.50 CLEAN N DPRB COMP PUMPED AND SPOTTED 2 BBL HI-VIS PILL ON BOTTOM.
PUMP RATE 3 BPM, SPP 3,000 PSI.
13:30 - 17:30 4.00 CLEAN N DPRB COMP HELD PJSM. POOH w/2-3/8" DP FROM 9,575' TO
SURFACE. RACKED DP IN DERRICK. L / D MULE SHOE.
17:30 - 18:00 0.50 CLEAN P COMP SERVICED RIG.
18:00 - 20:00 2.00 CLEAN P COMP ADJUSTED TOP DRIVE TO THE TTRD MODE.
20:00 - 21:00 1.00 CLEAN P COMP HELD PJSM. N / D BELL NIPPLE AND FLOW LINE.
2I:00 - 22:00 1.00 CLEAN P COMP HELD PJSM. R / U HOWCO SLICKLINE EQUIPMENT AND
LUBRICATOR. TESTED LUBRICATOR TO 1,000 PSI. OK.
22:00 - 00:00 2.00 CLEAN P COMP RIH w/X-EQUALIZING TOOL ON SLICK LINE
6/5/2001 00:00 - 01 '00 1.00 PULL P COMP RIH w/X-EQUALIZING TOOL ON SLICK LINE, BUMPED XX
PLUG w/X-EQUALIZING TOOL AT 9,569' (WLM). TOOL &
SLIOKLINE PUSHED UP HOLE TO 9,506' (WLM) PULLED UP
TO 9,450'. RIH, COULD NOT GET PAST 9,506'.
01:00 - 02:00 1.00 PULL P COMP POOH w/SLIGKLINE. EXAMINED X-EQUALIZING TOOL,
CONFIRMED TOOL CONTACTED PLUG. OBSERVED GOOD
PLUG MARKS ON BOTTOM OF TOOL.
02:00 - 04:30 2.50 PULL N DPRB COMP M / U BAILER & RIH ON SLICKLINE. TAGGED UP AT 9,506'
(WLM). ATTEMPTED TO BAIL. 0 FEET MADE. POOH w/
BAILER, BAILER EMPTY.
04:30 - 06:00 1.50 PULL N DPRB COMP M / U LEAD IMPRESSION BLOCK & RIH ON SLICKLINE.
TAGGED UP AT 9,506'. JARRED DOWN ON IMPRESSION
BLOCK. POOH. IMPRESSION BLOCK SHOWED TOP QF XX
PLUG LOOKING UP.
AFTER OPENING EQUALIZING PORTS, XX NIPPLE
UNLATCHED AND MOVED UP THE HOLE 63'.
06:00 - 09'30 3.50 PULL N COMP HELD PJSM. M / U PLUG RETRIEVING TOOL ON
SLlCKLINE AND RIH. LATCHED ONTO XX PLUG AND POOH
VERY SLOWLY DUE TO HOLE SWABBING.
09:30 - 10:30 1.00 PULL N COMP HELD PJSM. R / D HOWCO SLICKLINE EQUIPMENT AND
LUBRICATOR.
10:30- 11:00 0.50 PULL N COMP HELD PJSM. N / U BELL NIPPLE AND FLOWLINE.
11:00- 11:30 0.50 PULL N COMP HELD PJSM. P / U BHA. HTC :?,.70" STR444 PDC BIT, w/4 x
12 JETS SER# 1901579 - XO - 2.875" NAVIDRILL MOTOR -
XO - FLOAT ,SUB - CIRCULATION VALVE. - 3.125" BOWEN
OIL JARS, TOTAL BHA LENGTH - 23.97'.
11:30 - 17:00 5.50 PULL N COMP RIH w/BHA ON 2-3/8" H90 D.P. FROM DERRICK TO 9,670'.
FILLED PIPE EVERY 25 STANDS
17:00- 18:00 1.00 PULL N COMP HELD PJSM. SLIPPED AND CUT 60' OF DRILLING LINE.
18:00 - 23:00 5.00 PULL N COMP RIH w/2-3~8" H90 D.P. FROM 9,670' TO 12,290'. P / U 82 JTS
FROM PIPE SHED. TAGGED BRIDGE AT 12,290'.
23'00 - 00:00 1.00 PULL N COMP M / U TOP DRIVE AND WASHED DOWN FROM 12,290' TO
12,400'. PUMP RATE 1.75 BPM, SPP 1,500 PSI.
6/6/2001 00:00 - 03:30 3.50 CLEAN P COMP WASHED AND TRIPPED IN THE HOLE FROM 12,400' TO
13,982'. TAGGED UP AT TOP OF PERFORATIONS 12,800'.
03:30 - 06:00 2.50 CLEAN P COMP CIRCULATED BOTTOMS UP AT 13,982'. CIRCULATED
THROUGH BIT FOR 30 MINUTES AT 2.4 BPM, SPP 2,000
PSI. DROPPED BALL AND OPENED CIRCULATING VALVE,
PUMP RATE 2.8 BPM, SPP 2,500 PSI.
Printed: 6/11/2001 2:49:35 PM
.......................................................................................................................................................................................... : .................... . ................... : ........................... :..: .................. : .............................................................. : ........................ ..:.:.:.:.:........: .............. . ........... ..~.:: ..:;..:.. ~::.:~ '. .
Legal Well Name: 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date: 7/t5/1987
Event Name' WORKOVER Start: 5/24/2001 End: 6/9/2001
Contractor Name: DOYON Rig Release: 6/9/2001
Rig Name: DOYON 15 Rig Number:
61612001 06:00 - 06:30 0.50 CLEAN P COMP MONITORED WELL. GAS PERCOLATING UP THROUGH
BRINE WITH SLIGHT FLOW.
06'30-07:30 1.00 CLEAN N DPRB COMP CIRCULATED BOTTOMS UP. PUMP RATE 2.8 BPM, SPP
2,400 PSI. NO GAS, NO GAIN OR LOSS. MW IN 10.7 ppg,
MW OUT 10.5 ppg.
07:30-08:00 0.50 CLEAN N DPRB COMP MONITORED WELL. GAS PERCOLATING UP THROUGH
BRINE WITH SLIGHT FLOW.
08:00 - 08:30 0.50 CLEAN N DPRB COMP PUMPED AND SPOTTED 40 BBL 11.2 ppg HI-VIS PILL ON
BOTTOM. PUMP RATE 2.8 BPM, SPP 2,400 PSI.
08:30- 09:00 0.50 CLEAN N DPRB COMP MONITORED WELL. GAS PERCOLATING UP THROUGH
BRINE WITH VERY SLIGHT FLOW.
09:00- 10:30 1.50 CLEAN N DPRB COMP CIRCULATED COMPLETE MUD SYSTEM, SURFACE TO
SURFACE. NO GAS, NO GAIN OR LOSS. PUMP RATE 2.8
BPM, SPP 2,400 PSI. MW IN 10.7 ppg, MW OUT 10.7 ppg.
10:30- 11:00 0.50 CLEAN N DPRB COMP MONITORED WELL. SLIGHT GAS PERCOLATION UP
THROUGH BRINE, WELL STATIC.
11'00- 11:30 0.50 CLEAN N DPRB COMP ATTEMPTED TO POOH, HOLE SWABBING w/SLIGHT
FLOW.
11'30 - 14:00 2.50 CLEAN N DPRB COMP CIRCULATED MUD SYSTEM AND INCREASED MUD
WEIGHT TO 10.9 ppg. PUMP RATE 2.8 BPM, SPP 2,400 PSI.
MW IN 10.9 ppg, MW OUT 10.9 ppg. NO GAS, NO GAIN OR
LOSS WHILE CIRCULATING.
14:00- 14:30 0.50 CLEAN P COMP MONITORED WELL. WELL STATIC, w/SLIGHT GAS
PERCOLATION.
14:30 - 15:00 0.50 CLEAN P COMP PUMPED AND SPOTTED 40 BBL tl.3 ppg HI-VIS PILL ON
BOTTOM. PUMP RATE 2.8 BPM, SPP 2,700 PSI.
15:00 - 15:30 0.50 CLEAN P COMP MONITORED WELL. WELL STATIC.
15'30 - 00:00 8.50 CLEAN P COMP POOH VERY SLOW TO AVOID SWABBING WELL.
MAXIMUM RATE 7 STDS / HR. FLOW CHECKED WELL
EVERY 7 STANDS, WELL STATIC. 60 STDS OUT AT 00:00
HR. CALCULATED FILL 15.6 BBLS, ACTUAL FILL 17 BBLS.
617/2001 00:00- 00:30 0.50 CLEAN P COMP FLOW CHECK'D WELL, WELL TAKING FLUID.
00:30 - 05:30 5.00 CLEAN P COMP POOH SLOWLY w/87 STDS. CALCULATED FILL 22.6 BBLS,
ACTUAL FILL 28 BBLS. LOSSES TO THE HOLE 1 BBL / HR.
05:30 - 06:00 0.50 CLEAN P COMP BROKE OUT AND L / D BHA.
06:00 - 07'00 1.00 CASE P COMP RIGGED UP EQUIPMENT TO RUN 2-7/8" LINER.
07:00 - 07'30 0.50 CASE P COMP SERVICED RIG.
07:30- 08:30 1.00 CASE P COMP REPAIRED TOP DRIVE.
08:30 - 16:30 8.00 CASE P COMP M / U AND RIH w/128 JTS 2-7/8" 6.4# STL Cr 13 LINER. M /
U TURBOLATOR PUPS TO JTS #3 -#77.
MAKE UP TORQUE 1,000 ft / lbs
16:30 - 17:00 0.50 CASE P COMP M / U 2-7/8" LINER RUNNING TOOL TO LINER.
17:00 - 17:30 0.50 CASE P COMP HELD PJSM. CHANGED OUT 2-7/8" LINER RUNNING
EQUIPMENT TO 2-3/8" DP EQUIPMENT. M / U PUMP IN
SUB INTO TOP OF LINER RUNNING TOOL. ESTABLISHED
CIRCULATION THROUGH LINER. 2 BPM, SPP 650 PSI. R /
D PUMP IN SUB.
17:30 - 00:00 6.50 CASE P COMP RIH w/2-7/8" LINER ON 2-3/8" D.P. FILLED D.P. EVERY 20
STANDS.
6/8/2001 00:00 - 00:30 0.50 CEMT P COMP M / U CEMENT HEAD.
00'30 - 01:00 0.50 CEMT P COMP TAGGED BOTTOM ~ 13,982'. DOWN WEIGHT 120,000#, UP
WEIGHT 165,000#.
Printed: 6t11/2001 2:49:35 PM
Legal Well Name: 1-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date' 7/15/1987
Event Name: WORKOVER Start: 5/24/2001 End: 6t9/2001
Contractor Name' DOYON Rig Release' 61912001
Rig Name: DOYON 15 Rig Number:
6/8/2001 00:30 - 01:00 0.50 CEMT P COMP LINER EQUIPMENT SET AT THE FOLLOWING DEPTHS:
ITEM LENGTH
DEPTH
FLOAT SHOE 1.32'
13,982.00'
1 JT 2-7~8" 6.4# 13 CR LNR 38.78'
13,943.22'
FLOAT COLLAR 1.12'
13,942.10'
1 JT 2-7/8" 6.4# 13 CR LNR 36.76'
13,905.34'
LANDING NIPPLE 0.70'
13,904.64
75 JTS 2-7/8" 6.6# 13 CR LNR w/TURBOLATORS
2,682.45'
11,222.19'
50 JTS 2-7/8" 6.6# 13 CR LNR 1,523.19'
9,699.00'
2 2-7~8" 6.6# 13 CR LNR PUPS 19.55'
9,679.45'
I JT 2-7~8" 6.6# 13 CR LNR 30.30'
9,649.15'
LINER TIE BACK SLEEVE 9.83'
9,639.32'
01:00- 02:30 1.50 CEMT P COMP CIRCULATED BOTTOMS UP. PUMP RATE 2.2 BPM, SPP
2,000 PSI. RECIPROCATED LINER.
02:30 - 03:30 1.00 CEMT P COMP PUMPED 20 BBL HI-VIS PILL, FOLLOWED BY 60 BBL
BRINE. PUMP RATE 2.2 BPM, SPP 2,000 PSI. DROPPED
BALL TO RELEASE RUNNING TOOL OUT OF LINER.
RUNNING TOOL SHEARED AT 3,500 PSI. SHUT DOWN
PUMPS, P / U ON STRING, STRING WEIGHT 135,000#,
LOST LINER WEIGHT OF 30,000#. SET BACK DOWN,
RE-ESTABLISHED CIRCULATION.
03'30 - 05:00 1.50 CEMT P COMP HELD PJSM. TESTED LINES TO 4,500 PSI. OK. PUMPED 20
BBL CHEM WASH AT 2.0 BPM AT 2,450 PSI. MIXED AND
PUMPED 36 BBLS - 173 SX CLASS "G" CEMENT w/0.450
%BWOC D065-DISPERSENT, 0.210 %BWOC DS00
-RETARDER, 0.100 GAL/SK D047-ANTIFOAM, 0.150 GAL/SK
D135 ~GASBLOCK, 2.00 GAL/SK D600-GASBLOCK.
PUMPED CEMENT AT THE FOLLOW RATES:
Purnped Rate Pressure
10.0 BBLS 2.00 BPM 2,400 PSI
20.0 BBLS 2.00 BPM 2,000 PSI
30.0 BBLS 2.00 BPM 1,700 PSI
36.0 BBLS 2.00 BPM 1,550 PSI
DROPPED DP DART AND DISPLACED w/5 BBL WATER AT
2.00 BPM. DISPLACED CEMENT w/50 BBL OF BRINE AT
THE FOLLOWING RATES:
Pumped Rate Pressure
10.0 BBLS 1.50 BPM 660 PSI
Printed: 6t11/2001 2:49:35 PM
,SCANNED JUN ?, & 7Of}2.
................................................................... . --:-' .. ;
Legal Well Name: ~-47A/M-20
Common Well Name: 1-47A/M-20 Spud Date' 7/15/1987
Event Name: WORKOVER Start: 5/24/2001 End' 6/9/2001
Contractor Name: DOYON Rig Release' 6/9/200~
Rig Name' DOYON 15 Rig Number:
6/8/2001 03:30- 05'00 1.50 CEMT P COMP 20.0 BBLS 1.50 BPM 1,050 PSI
26.0 BBLS 1.50 BPM 1,200 PSI
DP Dart hit Wiper plug pressure incr to 3,200 psi, Plug shear'd,
pressure decreased to 1,430 psi.
30.0 BBLS 1.50 BPM 1,430 PSI
40.0 BBLS 1.50 BPM 1,720 PSI
45.0 BBLS slw'd props 1.00 BPM 1,400 PSI
49.5 BBLS 1.00 BPM 1,400
PSI
WIPER PLUG HIT w/49.55 BBLS OUT. BUMPED PLUG w/
2,000 PSI. INCREASED PRESSURE TO 3,000 PSI. OK.
RELEASED PRESSURE AND BLED BACK 1/4 BBL. FLOATS
HELD. CEMENT PLACE AT 04:45.
05:00 - 05:30 0.50 CEMT P COMP PRESSURED UP ON STRING TO 1,000 PSI. PULLED UP
OUT OF LINER. PRESSURE DROPPED TO 0 PSi
INDICATING RUNNING TOOL FREE OF LINER. REVERSE
CIRCULATED THE HOLE. PUMP RATE 3 BPM, SPP 1,500
PSI. DID NOT OBSERVE CEMENT IN RETURNS.
05:30 - 06'00 0.50 CEMT P COMP R / D CEMENT HEAD AND LINES.
06:00 - 06:30 0.50 CASE P COMP R / U EQUIPMENT TO LAY DOWN 2-3/8" DP
06:30 - 14:30 8.00 CASE P COMP HELD PJSM. POOH FROM 9,630'. L / D 275 JTS OF 2-3/8"
DP.
14:30 - 15:00 0.50 CASE P COMP BROKE OUT, WASHED UP AND L / D LINER RUNNING
TOOL.
15:00 - 22:30 7.50 CASE P COMP RIH w/46 STANDS OF 2-3/8" DP FROM DERRICK. BROKE
OUT AND L / D SAME.
22:30 - 23:30 1.00 BOPSUF P COMP FMC SET TWC. TESTED TO 500 PSI. OK.
23:30 - 00:00 0.50 BOPSUF P COMP N / D AND PICKLED 7-1/6" BOP STACK.
6/9/2001 00:00 - 04:30 4.50 BOPSUF P COMP N / D AND PICKLED 7-1/16" BOP STACK.
04:30 - 05:30 1.00 WHSUR P COMP HELD PJSM. N / U XMAS TREE AND TEST TO 5,000 PSI.
OK.
05:30 - 06:00 0.50 WHSUR P COMP R / U LUBRICATOR, PULLED TWC, R / D LUBRICATOR.
06:00 - 07:30 1.50 WHSUR P COMP HELD PJSM. R / U HB&R TO TREE.
07:30 - 08:30 1.00 WHSUR P COMP PRESSURE TESTED SURFACE LINES TO 2,000 PSi. OK.
OPENED ANNULUS VALVE AND PRESSURED UP ON
ANNULUS TO 500 PSI, RP VALVE SHEARED. PUMPED 105
BBLS OF DIESEL DOWN ANNULUS TO FREEZE PROTECT.
PUMP RATE 3 BPM, 1,850 PSI.
08:30- 11:30 3.00 WHSUR P COMP U-TUBED ANNULUS TO TUBING TO FREEZE PROTECT.
11:30 - 12:30 1.00 WHSUR P COMP HELD PJSM. CLOSED ANNULUS VALVE AND PUMPED
DOWN TUBING w/HB&R TO PRESSURE TEST LINER LAP.
PRESSURE TESTED LINER LAP TO 2,000 PSI, HELD FOR
15 MINUTES, OK.
12:30- 13:30 1.00 WHSUB P COMP RIGGED DOWN LINES FROM HB&R TO TREE.
13:30 - 14:00 0.50 WHSUR P COMP RAN AND SET BPV.
13:30- 14:00 0.50 WHSUR P COMP INSTALLED TREE CAP, SECURED WELL.
14:00 - 18:00 4.00 DEMOB P COMP RIGGED DOWN TO MOVE. CLEANED PITS AND CELLAR.
RELEASED RIG AT 18:00 HRS 06-09-2001TO MOVE TO 1-29
/ M-25.
Printed: 6/11t2001 2:49:35 PM
$CANNEt3 JUN 2, 2002
Well' 1-47A/M-20 Rig Accept: 05/25/01
Field: Duck Island Unit / Endicott
APl' 50-029-21625-01 Rig Release: 06/09t01
Permit: 197-203 Drilling Ricj' Doyon 15
POST- RIG WORKOVEFI
,,,
06114/01
Enter top of liner at 9640' (drillers depth) with no problems. Mill through cement stringers to 13521 '.
Dry tag at 13521 '.
06/15/01
Make up PDS memory GR / CCL and run in hole. Log well to tie-in perforating guns. Under balance
well with 2000' of methanol. Pick up gun #1. Run in hole. Correlate to flag depth. Position top shot at
13458'. Pump ball, fire gun #1.
06/16/01
RIH with gun #2. Tie into flag and position gun #2. With well flowing, perforate interval 12930' to
12950'. All shots fired. Pick up and run in hole with GR / CCL logging tool. Flag coil. Pull out of hole.
Pick up and run in hole with gun #3. Tie into flag. Position gun #3 with top shot at 12885'. With well
flowing, fire gun. Pull out of hole. All shots fired. RIH with gun #4. Correct at flag. With well flowing,
perforate 12846' to 12866'.
06/17/01
Pull out of hole with gun #4, all shots fired. Make up gun #5, run in hole. Position and perforate 12800'
to 12820'. Pull out of hole, lay down gun, all shots fired.
¢ANNE JUN 20
cov~ ~s m~~
ON' OR BEFORE
PL E
~~ r__~_~ ~A L
D
C:LO~ILM. DOC
W
E R
TH IS M ARK ER
Well Report ~ucr is UNIT MPI 1-47A/M20
t..GoIfiP. 01 ,'24 / 1998 Completion Status: 1-OIL Current Status
029-21625-01
197-203-0 BP EXPLORATION MD 1407~'~TVD 10357
Name Interval Sent Received BO
8413 LD-'"i - 13 SPERRY MPT/GR/EWR4/CNP/SLD 2/25/98 2/25/98
8414 /_./D/I-7
8415 ~'~'-9
BACKOFF RCD LI~INAL
DGR/CNP/SLD/MD ~FINAL
DGR/CNP/SLD/MD L FINAL
DGR/CNP/SLD/TVD L//FINAL
EZSV RCD ~ FINAL
..-
MWD SRVY ~
NGP/DGR/CNP/SLD /FINAL
NGP/DGR/CNP/SLD t~F~AL
NGP/DGR/CNP/SLD [~INAL
NGP/DGR/EWR4-MD ~/FINAL
NGP/DGR/EWR4-MD ~FINAL
NGP/DGR/EWR4-TVD L'/"FINAL
NGP/DGR/EWR4/MD .Ja'/FINAL
NOP/DOR/~.WR4/TVD ~ FINb~L
NGP/DGR/EWR4/TVD kC//FINAL
PERF/GR/CCL ~/"FINAL
PERF/GR/CCL ~INAL
SBT q,/'~INAL
SBT 12/26/97 oL<"'FINAL
SBT 12/22/97 L~FINAL
SPERRY MPT/GR/EWR4/CNP/SLD P
SPERRY MPT/GR/EWR4/CNP/SLD P
12875
8429-13085 PB2
8429-12920 PB1
8050-10198PB2;
8470-8620
SPERRY 12559.80-14075
12230-14075 '
8050-10173-PBJ
9968-10356
8429-14075-
8429-12920 PBk
8050-10356
8429-13085 PB2
8050-10197 PB2
8050-10173-PB'1
11280-12440 12/~/97
12390-12722
f /
11200-12155 !.k/ZG 5'-7
11900-12560
Daily Well Ops/¢3/~]-- )~~(~
Was the well cored? yes ~-
2/25/98 2/25/98
2/25/98 2/25/98
12/29/97 12/30/97
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
12/29/97 12/30/97
3/2/98 3/3/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
3/4/98 3/4/98
12/30/97 1/5/98
12/30/97 1/5/98
1/20/98 1/23/98
12/30/97 1/5/98
12/30/97 1/5/98
Are Dry Ditch Samples Required? yes ~.~ And Received?
Analysis Description Received". Sampte'Set-#'~~
Comments:
January 10, 2000
Page 1 of 1
ri I:! I I__1__ I I~ G S E I:IWI r' I:: S
WELL LOG TRANSMITTAL
To: State of Alaska March 4, 1998
Alaska Oil and Gas Conservation Comm.
Attn.' Lori Taylor
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs 1-47A/M-20, PB1 & PB2, AK-MM-70171
The technical data 'lis{ed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1-47A/M-20:
2" x 5" MD Resistivity & Gamma Ray Logs:
50-029-21625-01
2" x 5" TVD Resistivity & Gamma Ray Logs:
50-029-21625-01
2" x 5" MD Neutron & Density Logs:
50-029-21625-01
2" x 5" TVD Neutron & Density Logs:
50-029-21625-01
1-47A/M-20 PBI:
2" x 5" MD Resistivity & Gamma Ray Logs:
50-029-21625-70
2" x 5" TVD Resistivity & Gamma Ray Logs:
50-029-21625-70
2" x 5" MD Neutron & Density Logs:
50-029-21625-70
2" x 5" TVD Neutron & Density Logs:
50-029-21625-70
1-47A/M-20 PB2:
2" x 5" MD Resistivity & Gamma Ray Logs'
50-029-21625-71
" Logs~. -
2 x 5" TVD Resistivity & Gamma Ray
,50-029-21625-71
2" x 5' MD Neutron & Density Logs:
50-029-21625-71
2" x 5" TVD Neutron & Density Logs'
50-029-21625-71
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[~ Oil E~ Gas [~ Suspended [~] Abandoned [~ Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 97-203 397-238
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21625-01
4. Location of well at surface ~ '~ 9. Unit or Lease Name
~i~ [! Duck Island Unit/Endicott
2146'SNL, 2169'WEL, SEC. 36, T12N, R16E, UPM i':i:':, i'-::i" ~.~,~:~ !' 10. WellNumber
At top of productive interval ~/ '~'~//~///~'~-~" ~" ..... '.~
1635' SNL, 493' EWL, SEC. 31, T12N, R17E, UPM ~ i'i'"~,~~~~ 1-47A/M-20
At total depth ' : : -. 11. Field and Pool
1874' SNL, 1934' EWL, SEC. 31, T12N, R17E, UPM . ~//¢.,~,,,.~__
Endicott
Field
/
Endicott
Pool
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease De~,i~n~.tio~'and:Serial No.
KBE = 55.1'I ADL 312828
12. Date Spudded11/20/97 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re ]16' N°' °f C°mpleti°nsl/9/98 1/24/98 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional Survey ]20. Depth where SSS,V, set J21. Thickness of Permafrost
14075 10357 FT] 13983 10341 FTI [~Yes [~NoI ,1554..MD. 1.' "' 1465' (Approx.)
22. Type Electric or Other Logs Run
MWD, LWD, DIR/FE, GR/SBT/CCL/Tractor Tool/VDL, CBL
23. CASlNG~ LINER AND CEMENTING RECORD ' ~ :. ~-; ~;' ,~,~ ~-.
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SiZE CEMENTING RECORD AM.O..,,U~"['PULLED
30" Structural Drive Pipe Surface Surface Driven
13-3/8" 72# L-80 Surface 2496' 17-1/2" 2362 c.f. Permafrost ~.~i.:.~.~
9-5/8" 47# NT80C/NT95HS Surface 8429' 12-1/4" 425 c.f. Class 'G'
7" 29# L-80 7758' 12582' 8-1/2" See cement squeeze attachment
4-1/2" 12.6# L-80 11318' 14073' 6" 392 c.f. Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-7/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 9739' 9683'
MD TVD MD TVD ..
12930'-12950' 10170'-10174'
13458'-13478' 10255'-10258' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protect with 100 bbls diesel
See Attachment
27. PRODUCTION TEST U 1: i I I
Date First Production I Method of Operation (Flowing, gas lift, etc.) ....... ' '"
January 24, 1998 I Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
S2A1 12552' 10077'
Zone 1 12959' 10175'
S1B 13176' 10209'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32". I hereby certify that the foregoing is true and c~orrect to the best qf my knowledge
Signed¢~..~ ~_. ~ ~)~,?¢__¢.~¢~"'t ¢~ ~-...~.U¢..,,%~'"~ll _u~¢¢-~ ~ '-/'~ :-~
Steve Shultz /~'~,1 Title ~qg,,,~i,,~upc,%'~ Date J~_*¢~//
1-47~M-20 ~ 97-203 397-238 Prepared By Name/Number: Kathy Campoamor, 564-5122
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
WELL NAME: 1-47A/M-20
26. (10-407) Attachment- Acid, Fracture, Cement Squeeze, Etc.
Depth Interval (MD)
12828'
12579'
12110'-12114', 12530'-12534'
11400'-11404', 12110'-12114'
12650'-12871'
11966'-12869'
Amount & Kind of Material Used
~.,~
Kickoff plug, 22 bbls 'G' (plugback 1)
Cement plug, 10 bbls 'G' to 1600 psi
Cement squeeze, 18 bbls 'G' to 2900 psi
Cement squeeze, 35 bbls 'G' to 2500 psi
Cement plug, 62 bbls 'G' (plugback 2)
Kickoff plug, 37 bbls 'G'
Facility
End MPI
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
1
18 February 98
Date/Time
15 Nov 97
16 Nov 97
17 Nov 97
18 Nov 97
19 Nov 97
20 Nov 97
06:00-06:30
06:30-13:00
13:00-14:00
14:00-17:00
17:00-18:00
18:00-18:30
18:30-19:30
19:30-20:00
20:00-23:00
23:00-01:00
01:00-06:00
06:00-06:30
06:30-10:30
10:30-14:30
14:30-18:00
18:00-18:30
18:30-21:30
21:30-22:30
22:30-00:30
00:30-03:30
03:30-06:00
06:00-06:30
06:30-11:00
11:00-15:00
15:00-18:00
18:00-18:30
18:30-19:30
19:30-22:30
22:30-00:30
00:30-03:30
03:30-06:00
06:00-06:30
06:30-07:00
07:00-12:00
12:00-13:30
13:30-14:00
14:00-16:30
16:30-21:00
21:00-21:30
21:30-22:30
22:30-23:30
23:30-02:30
02:30-03:00
03:00-05:00
05:00-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-19:30
19:30-21:30
21:30-23:00
23:00-00:00
00:00-03:30
03:30-04:00
Duration
1/2 hr
6-1/2 hr
lhr
3hr
lhr
1/2 hr
lhr
1/2hr
3hr
2hr
5hr
1/2 hr
4hr
4hr
3-1/2 hr
1/2 hr
3hr
lhr
2hr
3hr
2-1/2 hr
1/2hr
4-1/2 hr
4hr
3hr
1/2 hr
lhr
3hr
2hr
3hr
2-1/2 hr
1/2 hr
1/2 hr
5hr
1-1/2 hr
1/2 hr
2-1/2 hr
4-1/2 hr
1/2 hr
lhr
lhr
3hr
1/2hr
2hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
lhr
2hr
1-1/2 hr
lhr
3-1/2 hr
1/2 hr
Activity
Held safety meeting
Rig moved 100.00 %
Rigged up Drillfloor / Derrick
Rigged up Fluid system
Removed Hanger plug
Held safety meeting
Fill pits with Seawater
Held safety meeting
Reverse circulated at 9900.0 ft
Rigged down Wellhead primary components
Installed BOP stack
Held safety meeting
Rigged down BOP stack
Rigged up BOP stack
Tested BOP stack
Held safety meeting
Rig waited · Service personnel
Removed Hanger plug
Circulated at 9900.0 ft
Laid down 1500.0 ft of Tubing
Laid down 6000.0 ft of Tubing
Held safety meeting
Laid down 4000.0 ft of Tubing
Set Retrievable packer at 50.0 ft with 0.0 psi
Removed BOP stack
Held safety meeting
Installed Seal assembly
Rigged up BOP stack
Rigged down Well control
Conducted electric cable operations
Tested BOP stack
Held safety meeting
Tested BOP stack
Ran Drillpipe in stands to 8690.0 ft
Circulated at 8690.0 ft
Tested Casing
Pulled Drillpipe in stands to 0.0 ft
Set downhole equipment (wireline)
Serviced Top drive
Serviced Block line
Made up BHA no. 1
R.I.H. to 8524.0 ft
Tested Casing
· Circulated at 8524.0 ft
,,, Milled Casing at 8424.0 fi
Held safety meeting
Milled Casing at 8474.0 fi
Held safety meeting
Circulated at 8474.0 ft
Pulled out of hole to 682.0 ft
Pulled BHA
Washed to 0.0 ft
Ran Drillpipe in stands to 8524.0 ft
Washed to 8524.0 ft
Facility
End MPI
Progress Report
Well 1-47A/M-20 Page
Rig Doyon 15 Date
2
18 February 98
Date/Time
21 Nov 97
22 Nov 97
23 Nov 97
24 Nov 97
25 Nov 97
26 Nov 97
04:00-06:00
06:00-06:30
06:30-07:00
07:00-07:30
07:30-08:30
08:30-10:00
10:00-12:30
12:30-15:30
15:30-18:00
18:00-18:30
18:30-21:00
21:00-23:30
23:30-06:00
06:00-06:30
06:30-16:30
16:30-17:00
17:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-11:30
11:30-13:00
13:00-16:00
16:00-17:00
17:00-17:30
17:30-18:00
18:00-18:30
18:30-20:30
20:30-22:00
22:00-01:00
01:00-02:00
02:00-02:30
02:30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-13:30
13:30-14:30
14:30-15:30
15:30-16:00
16:00-17:30
17:30-18:00
18:00-18:30
18:30-21:30
21:30-22:00
22:00-23:00
23:00-02:00
02:00-03:00
Duration
2hr
1/2 hr
1/2 hr
1/2hr
lhr
1-1/2 hr
2-1/2 hr
3hr
2-1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
6-1/2 hr
1/2 hr
10hr
1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2hr
11-1/2 hr
1/2 hr
5hr
1-1/2 hr
3hr
lhr
1/2 hr
1/2 hr
1/2 hr
2hr
1-1/2 hr
3hr
lhr
1/2 hr
3-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
7hr
lhr
lhr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
3hr
1/2 hr
lhr
3hr
lhr
Activity
Circulated at 8524.0 ft
Held safety meeting
Mixed and pumped slurry - 52.000 bbl
Pulled out of hole to 7370.0 ft
Reverse circulated at 7370.0 ft
Held 1000.0 psi pressure on 0.000 bbl squeezed cement
Pulled out of hole to 0.0 ft
Made up BHA no. 1
R.I.H. to 3040.0 ft
Held safety meeting
R.I.H. to 8210.0 ft
Drilled cement to 8429.0 ft
Drilled to 8455.0 ft
Held safety meeting
Drilled to 8578.0 ft
Circulated at 8578.0 ft
Drilled to 8599.0 ft
Held safety meeting
Drilled to 8789.0 ft
Held safety meeting
Drilled to 8985.0 ft
Held safety meeting
Drilled to 9143.0 ft
Held safety meeting
Drilled to 9208.0 ft
Circulated at 9208.0 ft
Pulled out of hole to 190.0 ft
Pulled BHA
Retrieved Wear bushing
Tested BOP stack
Held safety meeting
Tested BOP stack
Made up BHA no. 2
R.I.H. to 8429.0 ft
Serviced Block line
R.I.H. to 9208.0 ft
Drilled to 9271.0 ft
Held safety meeting
Drilled to 9528.0 ft
Held safety meeting
Drilled to 9699.0 ft
Held safety meeting
Drilled to 9737.0 ft
Pulled out of hole to 8417.0 ft
Flow check
R.I.H. to 9737.0 ft
Circulated at 9737.0 ft
Pulled out of hole to 8417.0 ft
Held safety meeting
Pulled out of hole to 2000.0 ft
Pulled BHA
Made up BHA no. 3
R.I.H. to 8429.0 ft
Serviced Block line
Facility
End MPI
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
3
18 February 98
Date/Time
27 Nov 97
28 Nov 97
29 Nov 97
30 Nov 97
01 Dec 97
02 Dec 97
03:00-03:30
03:30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18i30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-19:00
19:00-19:30
19:30-20:00
20:00-03:30
03:30-05:00
05:00-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-12:30
12:30-17:00
17:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-01:00
01:00-01:30
01:30-02:00
02:00-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-07:00
07:00-09:00
09:00-09:30
09:30-10:00
10:00-10:30
10:30-11:00
11:00-14:30
14:30-15:00
15:00-15:30
15:30-18:00
18:00-18:30
18:30-20:00
20:00-20:30
20:30-22:00
22:00-00:30
00:30-01:00
01:00-02:00
02:00-02:30
02:30-03:00
Duration
1/2 hr
2-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2hr
11-1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
7-1/2 hr
1-1/2 hr
lhr
1/2 hr
3-1/2 hr
lhr
1-1/2 hr
4-1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
6-1/2 hr
1/2 hr
1/2 hr
4hr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
1/2hr
2hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
1/2hr
1-1/2 hr
1/2hr
1-1/2 hr
2-1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
Activity
R.I.H. to 9737.0 ft
Drilled to 9780.0 ft
Held safety meeting
Drilled to 10010.0 ft
Held safety meeting
Drilled to 10221.0 ft
Held safety meeting
Drilled to 10495.0 ft
Held safety meeting
Drilled to 10508.0 ft
Pulled out of hole to 9652.0 ft
R.I.H. to 10508.0 ft
Drilled to 10670.0 ft
Circulated at 10670.0 ft
Pulled out of hole to 9200.0 ft
Held safety meeting
Pulled out of hole to 196.0 ft
Pulled BHA
Made up BHA no. 4
R.I.H. to 10670.0 ft
Drilled to 10690.0 ft
Held safety meeting
Drilled to 10949.0 ft
Held safety meeting
Drilled to 11230.0 ft
Held safety meeting
Drilled to 11383.0 ft
Pulled out of hole to 10412.0 ft
R.I.H. to 11383.0 ft
Drilled to 11468.0 ft
Held safety meeting
Drilled to 11835.0 ft
Held safety meeting
Drilled to 12180.0 ft
Held safety meeting
Drilled to 12230.0 ft
Circulated at 12230.0 ft
Flow check
Monitor wellbore pressures
Circulated at 12230.0 ft
Monitor wellbore pressures
Circulated closed in well at 12230.0 ft
Monitor wellbore pressures
Flow check
Circulated closed in well at 12230.0 ft
Held safety meeting
Circulated closed in well at 12230.0 ft
Flow check
Circulated at 12230.0 ft
Circulated at 12230.0 ft
Flow check
Circulated at 12230.0 ft
Flow check
Pulled out of hole to 11300.0 ft
Facility End MPI
late/Time
03 Dec 97
Duration
03:00-03:30 1/2 hr
03:30-06:00 2-1/2 hr
06:00-06:30 1/2 hr
06:30-08:30 2 hr
08:30-09:00 1/2 hr
09:00-09:30 1/2 hr
09:30-13:00 3-1/2 hr
13:00-13:30 1/2 hr
13:30-15:30 2 hr
15:30-18:00 2-1/2 hr
18:00-18:30 1/2 hr
18:30-19:30 1 hr
19:30-20:00 1/2 hr
20:00-20:45 3/4 hr
20:45-21:00 1/4 hr
21:00-01:30 4-1/2 hr
01:30-05:00 3-1/2 hr
05:00-06:00 1 hr
06:00-06:30 1/2 hr
06:30-18:00 11-1/2 hr
18:00-18:30 1/2 hr
18:30-06:00 11-1/2 hr
04 Dec 97 06:00-06:30 1/2 hr
06:30-07:00 1/2 hr
07:00-07:15 1/4 hr
07:15-08:00 3/4 hr
08:00-08:30 1/2 hr
08:30-09:00 1/2 hr
09:00-18:00 9 hr
18:00-18:30 1/2 hr
18:30-19:30 1 hr
19:30-19:45 1/4 hr
19:45-21:00 1-1/4 hr
21:00-21:15 1/4 hr
21:15-22:00 3/4 hr
22:00-22:30 1/2 hr
22:30-03:30 5 hr
05 Dec 97 03:30-04:30 1 hr
04:30-05:00 1/2 hr
05:00-06:00 1 hr
06:00-06:30 1/2 hr
06:30-10:00 3-1/2 hr
10:00-11:00 1 hr
11:00-13:00 2hr
13:00-17:30 4-1/2 hr
17:30-18:00 1/2 hr
18:00-18:30 1/2 hr
18:30-06:00 11-1/2 hr
06 Dec 97 06:00-06:30 1/2 hr
06:30-18:00 11-1/2 hr
18:00-18:30 1/2 hr
18:30-22:00 3-1/2 hr
22:00-00:00 2 hr
07 Dec 97 00:00-00:15 1/4 hr
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
4
18 February 98
Activity
Flow check
Pulled out of hole to 5000.0 ft
Held safety meeting
Pulled out of hole to 178.8 ft
Pulled BHA
Removed Wear bushing
Tested All functions
Installed Wear bushing
Made up BI-IA no. 5
R.I.H. to 8334.0 ft
Held safety meeting
Serviced Block line
R.I.H. to 10100.0 fl
Reamed to 10200.0 ft
Took MWD survey at 10118.0 ft
Reamed to 12000.0 ft
Logged hole with LWD: DIPJFE from 12000.0 ft to 12230.0 ft
Drilled to 12250.0 fl
Held safety meeting
Drilled to 12363.0 ft
Held safety meeting
Drilled to 12455.0 ft
Held safety meeting
Drilled to 12465.0 ft
Flow check
Pulled out of hole to 11508.0 ft
R.I.H. to 12369.0 ft
Reamed to 12465.0 ft
Drilled to 12521.0 fl
Held safety meeting
Drilled to 12523.0 ft
Flow check
Circulated at 125236.0 ft
Flow check
Pulled out of hole to 11600.0 ft
Circulated at 11600.0 fl
Pulled out of hole to 233.0 ft
Downloaded MWD tool
Pulled BHA
Made up BHA no. 6
Held safety meeting
R.I.H. to 8400.0 ft
R.I.H. to 12048.0 fl
Reamed to 12523.0 ft
Drilled to 12529.0 ft
Held safety meeting
Drilled to 12700.0 ft
Held safety meeting
Drilled to 12793.0 ft
Held safety meeting
Drilled to 12820.0 ft
Circulated at 12820.0 ft
Flow check
Facility
End MPI
Progress Report
Well 1-47A/M-20 Page 5
Rig Doyon 15 Date 18 February 98
Date/Time
08 Dec 97
09 Dec 97
10 Dec 97
00:15-01:00
01:00-01:30
01:30-05:00
05:00-06:00
06:00-06:30
06:30-08:00
08:00-10:30
10:30-11:30
11:30-13:00
13:00-15:00
15:00-18:00
18:00-18:30
18:30-20:00
20:00-20:30
20:30-02:00
02:00-03:00
03:00-06:00
06:00-06:30
06:30-07:00
07:00-08:00
08:00-09:00
09:00-11:00
11:00-13:30
13:30-14:30
14:30-15:30
15:30-17:00
17:00-18:00
18:00-18:30
18:30-20:00
20:00-23:30
23:30-01:30
01:30-06:00
06:00-06:30
06:30-15:00
15:00-16:00
16:00-18:00
18:00-18:30
18:30-20:00
20:00-21:30
21:30-22:30
22:30-03:00
03:00-03:30
03:30-04:00
04:00-06:00
06:00-06:30
06:30-08:00
08:00-08:30
08:30-11:30
11:30-17:00
17:00-18:00
18:00-18:30
18:30-19:30
19:30-20:30
Duration
3/4 hr
1/2 hr
3-1/2 hr
lhr
1/2 hr
1-1/2 hr
2-1/2 hr
lhr
1-1/2 hr
2hr
3hr
1/2 hr
1-1/2 hr
1/2hr
5-1/2 hr
lhr
3hr
1/2 hr
1/2hr
lhr
lhr
2hr
2-1/2 hr
lhr
lhr
1-1/2 hr
lhr
1/2hr
1-1/2 hr
3-1/2 hr
2hr
4-1/2 hr
1/2hr
8-1/2 hr
lhr
2hr
1/2 hr
1-1/2 hr
1-1/2 hr
lhr
4-1/2 hr
1/2 hr
1/2 hr
2hr
1/2hr
1-1/2 hr
1/2 hr
3hr
5-1/2 hr
lhr
1/2 hr
lhr
lhr
Activity
Pulled out of hole to 11900.0 ft
Flow check
Pulled out of hole to 200.0 ft
Pulled BHA
Held safety meeting
Made up BHA no. 7
R.I.H. to 8400.0 ft
Serviced Block line
R.I.H. to 12520.0 ft
Reamed to 12820.0 ft
Drilled to 12857.0 fl
Held safety meeting
Drilled to 12879.0 ft
Logged hole with LWD: Formation evaluation (FE) from 12800.0 ft to
12807.0 ft
Drilled to 12920.0 ft
Circulated at 12920.0 ft
Pulled out of hole to 2500.0 ft
Held safety meeting
Pulled out of hole to 200.0 ft
Downloaded MWD tool
Pulled BHA
Made up BHA no. 8
R.I.H. to 8400.0 ft
Serviced Block line
R.I.H. to 11054.0 ft
Reamed to 11148.0 ft
R.I.H. to 12300.0 ft
Held safety meeting
Reamed to 12875.0 ft
Worked stuck pipe at 12875.0 ft
Circulated at 12875.0 ft
Worked stuck pipe at 12875.0 ft
Held safety meeting
Worked stuck pipe at 12875.0 ft
Rigged up Rigging equipment
Conducted electric cable operations
Held safety meeting
Conducted electric cable operations
Rigged down Logging/braided cable equipment
Circulated at 12805.0 ft
Pulled out of hole to 77.0 ft
Pulled BHA
Retrieved Wear bushing
Tested All functions
Held safety meeting
Tested BOP stack
Serviced Top drive
Made up BHA no. 9
R.I.H. to 7832.0 ft
Serviced Block line
Held safety meeting
R.I.H. to 12875.0 ft
Fished at 12875.0 ft ,
Facility
End MPI
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
6
18 February 98
Date/Time
11 Dec 97
12 Dec 97
13 Dec 97
14 Dec 97
15 Dec 97
20:30-21:30
21:30-02:30
02:30-04:00
04:00-05:00
05:00-06:00
06:00-06:30
06:30-07:30
07:30-10:30
10:30-11:30
11:30-13:30
13:30-15:00
15:00-15:30
15:30-18:00
18:00-18:30
18:30-19:00
19:00-22:00
22:00-23:00
23:00-23:30
23:30-01:00
01:00-05:00
05:00-06:00
06:00-06:30
06:30-08:00
08:00-10:00
10:00-11:00
11:00-12:30
12:30-15:00
15:00-16:00
16:00-17:00
17:00-18:00
18:00-18:30
18:30-19:00
19:00-06:00
06:00-06:30
06:30-14:00
14:00-16:00
16:00-18:00
18:00-18:30
18:30-20:30
20:30-21:30
21:30-23:30
23:30-02:30
02:30-03:00
03:00-05:30
05:30-06:00
06:00-06:30
06:30-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-08:00
08:00-08:30
08:30-09:00
09:00-18:00
Duration
lhr
5hr
1-1/2 hr
lhr
lhr
1/2 hr
lhr
3hr
lhr
2hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
3hr
lhr
1/2 hr
1-1/2 hr
4hr
lhr
1/2 hr
1-1/2 hr
2hr
lhr
1-1/2 hr
2-1/2 hr
lhr
lhr
lhr
1/2 hr
1/2 hr
llhr
1/2hr
7-1/2 hr
2hr
2hr
1/2 hr
2hr
lhr
2hr
3hr
1/2 hr
2-1/2 hr
1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
9hr
Activity
Circulated at 12875.0 ft
Pulled out of hole to 321.0 ft
Pulled BHA
R.I.H. to 300.0 ft
Pulled BHA
Held safety meeting
Singled in drill pipe to 957.0 ft
Ran Drillpipe in stands to 8372.0 ft
Serviced Block line
Rig waited · Whiteout / Phase 2
Ran Drillpipe in stands to 12233.0 ft
Pulled out of hole to 11921.0 ft
Washed to 12304.0 ft
Held safety meeting
Washed to 12828.0 ft
Circulated at 12828.0 ft
Mixed and pumped slurry - 22.000 bbl
Pulled Drillpipe in stands to 11836.0 ft
Circulated at 11836.0 ft
Pulled out of hole to 957.0 ft
Laid down 957.0 ft of 3-1/2in OD drill pipe
Held safety meeting
Made up BHA no. 10
R.I.H. to 6715.0 ft
Laid down 855.0 ft of 5in OD drill pipe
R.I.H. to 10113.0 ft
Took MWD survey at 10113.0 ft
R.I.H. to 12200.0 ft
Washed to 12475.0 ft
Drilled cement to 12563.0 ft
Held safety meeting
Circulated at 12563.0 ft
Drilled to 12600.0 ft
Held safety meeting
Drilled to 12672.0 ft
Circulated at 12672.0 ft
Pulled out of hole to 8400.0 ft
Held safety meeting
Pulled out of hole to 218.0 ft
Pulled BHA
Made up BHA no. 11
R.I.H. to 8300.0 ft
Serviced Block line
R.I.H. to 12649.0 ft
Drilled to 12680.0 ft
Held safety meeting
Drilled to 12790.0 ft
Held safety meeting
Drilled to 12870.0 ft
Held safety meeting
Circulated at 12890.0 ft
Pulled out of hole to 11940.0 ft
R.I.H. to 11890.0 ft
Drilled to 12984.0 ft
Facility
Date/Time
16 Dec 97
17 Dec 97
18 Dec 97
19 Dec 97
End MPI
18:00-18:30
18:30-05:00
05:00-06:00
06:00-06:30
06:30-07:00
07:00-09:30
09:30-11:30
11:30-13:00
13:00-16:00
16:00-18:00
18:00-18:30
18:30-22:30
22:30-00:30
00:30-01:30
01:30-02:30
02:30-06:00
06:00-06:30
06:30-09:00
09:00-10:00
10:00-10:30
10:30-13:30
13:30-14:00
14:00-15:30
15:30-18:00
18:00-20:00
20:00-23:00
23:00-03:00
03:00-04:00
04:00-04:30
04:30-06:00
06:00-06:30
06:30-11:00
11:00-12:00
12:00-12:30
12:30-14:00
14:00-15:00
15:00-16:30
16:30-18:00
18:00-18:30
18:30-22:30
22:30-00:00
00:00-01:30
01:30-05:30
05:30-06:00
06:00-06:30
06:30-13:00
13:00-14:00
14:00-15:30
15:30-17:00
17:00-18:00
18:00-18:30
18:30-21:30
21:30-23:00
23:00-03:30
Duration
1/2 hr
10-1/2 hr
lhr
1/2hr
1/2 hr
2-1/2 hr
2hr
1-1/2 hr
3hr
2hr
1/2 hr
4hr
2hr
lhr
lhr
3-1/2 hr
1/2 hr
2-1/2 hr
lhr
1/2 hr
3hr
1/2hr
1-1/2 hr
2-1/2 hr
2hr
3hr
4hr
lhr
1/2 hr
1-1/2 hr
1/2 hr
4-1/2 hr
lhr
1/2 hr
1-1/2 hr
lhr
1-1/2 hr
1-1/2 hr
1/2 hr
4hr
1-1/2 hr
1-1/2 hr
4hr
1/2hr
1/2 hr
6-1/2 hr
lhr
1-1/2 hr
1-1/2 hr
lhr
1/2 hr
3hr
1-1/2 hr
4-1/2 hr
Progress Report
Well 1-47A/M-20 Page 7
Rig Doyon 15 Date 18 February 98
Activity
Held safety meeting
Drilled to 13085.0 ft
Circulated at 13085.0 ft
Held safety meeting
Circulated at 13085.0 ft
Pulled out of hole to 8429.0 ft
R.I.H. to 13055.0 ft
Reamed to 13085.0 ft
Circulated at 13085.0 ft
Pulled out of hole to 8810.0 ft
Held safety meeting
Pulled out of hole to 219.0 ft
Pulled BHA
Serviced Block line
Rigged up Casing handling equipment
Ran Liner to 2700.0 ft (7in OD)
Held safety meeting
Ran Liner to 4794.0 ft (7in OD)
Rigged up sub-surface equipment - Casing hanger
Circulated at 4890.0 ft
Ran Drillpipe on landing string to 8424.0 ft
Rigged up Casing handling equipment
Ran Drillpipe in stands to 11907.0 ft
Ran Drillpipe to 12574.0 ft (7in OD)
Circulated at 12574.0 ft
Pulled Drillpipe in stands to 0.0 ft
Tested BOP stack
Rigged up Drillfloor / Derrick
Serviced Top drive
Laid out Drillpipe from derrick
Held safety meeting
Laid out 5in drill pipe from derrick
Serviced Block line
Serviced Top drive
Repaired Drillfloor / Derrick
Laid out BHA from derrick
Made up BHA no. 12
Singled in drill pipe to 3400.0 ft
Held safety meeting
R.I.H. to 12491.0 ft
Drilled installed equipment - Landing collar
Circulated at 12579.0 ft
Pulled out of hole to 854.0 ft
Pulled BHA
Held safety meeting
Ran Drillpipe in stands to 12574.0 ft
Set packer at 12574.0 ft with 0.0 psi
Mixed and pumped slurry - 10.000 bbl
Reverse circulated at 12570.0 ft
Tested Liner
Held safety meeting
Pulled out of hole to 5168.0 ft
Pumped out of hole to 0.0 ft
Conducted electric cable operations
Facility
End MPI
Progress Report
Well 1-47ARM-20 Page 8
Rig Doyon 15 Date 18 February 98
Date/Time
20 Dec 97
21 Dec 97
22 Dec 97
23 Dec 97
24 Dec 97
03:30-06:00
06:00-06:30
06:30-07:00
07:00-13:30
13:30-14:30
14:30-15:00
15:00-16:00
16:00-17:00
17:00-18:00
18:00-21:00
21:00-22:00
22:00-23:30
23:30-00:00
00:00-01:30
01:30-03:00
03:00-05:00
05:00-06:00
06:00-09:00
09:00-10:30
10:30-15:00
15:00-22:30
22:30-00:30
00:30-02:30
02:30-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-08:30
08:30-12:00
12:00-15:00
15:00-18:00
18:00-19:30
19:30-21:30
21:30-22:00
22:00-23:30
23:30-01:30
01:30-03:00
03:00-03:30
03:30-05:30
05:30-06:00
06:00-07:00
07:00-15:00
15:00-17:00
17:00-20:00
20:00-20:30
20:30-02:00
02:00-02:30
02:30-03:30
03:30-04:30
04:30-06:00
06:00-08:00
08:00-08:30
08:30-14:00
14:00-14:30
Duration
2-1/2 hr
1/2 hr
1/2 hr
6-1/2 hr
lhr
1/2 hr
lhr
lhr
lhr
3hr
lhr
1-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
2hr
lhr
3hr
1-1/2 hr
4-1/2 hr
7-1/2 hr
2hr
2hr
1-1/2 hr
1/2 hr
1/2 hr
lhr
2-1/2 hr
3-1/2 hr
3hr
3hr
1-1/2 hr
2hr
1/2 hr
1-1/2 hr
2hr
1-1/2 hr
1/2 hr
2hr
1/2 hr
lhr
8hr
2hr
3hr
1/2 hr
5-1/2 hr
1/2hr
lhr
lhr
1-1/2 hr
2hr
1/2 hr
5-1/2 hr
1/2hr
Activity
Conducted electric cable operations
Held safety meeting
Rigged down Logging/braided cable equipment
Ran Drillpipe in stands to 12378.0 ft
Circulated at 12378.0 ft
Set packer at 12378.0 ft with 0.0 psi
Circulated at 12378.0 ft
Mixed and pumped slurry - 18.000 bbl
Pulled out of hole to 11800.0 ft
Circulated at 11800.0 ft
Serviced Block line
Pulled out of hole to 6500.0 ft
Set Retrievable packer at 52.0 ft with 0.0 psi
Rigged down BOP stack
Installed Tubing head spool
Installed BOP stack
Installed Wear bushing
Pulled out of hole to 0.0 ft
Made up BHA no. 13
R.I.H. to 12378.0 ft
Drilled installed equipment - Cement retainer
Circulated at 12582.0 ft
Pulled out of hole to 6015.0 ft
Pulled out of hole to 853.0 ft
Pulled BHA
Rigged up sub-surface equipment - Downhole measurement tools
Conducted electric cable operations
Conducted electric cable operations
Rig waited · Equipment
Fished at 7750.0 ft
Fished at 7750.0 ft
Made up BHA no. 14
R.I.H. to 7750.0 ft
Circulated at 7750.0 ft
R.I.H. to 12582.0 ft
Circulated at 12582.0 ft
Pulled out of hole to 7750.0 ft
Circulated at 7750.0 ft
Pulled out of hole to 550.0 ft
Pulled BHA
Pulled BHA
Conducted electric cable operations
Rig waited · Equipment
Perforated
Serviced Top drive
Ran Drillpipe in stands to 12175.0 ft
Set packer at 12175.0 ft with 0.0 psi
Circulated at 12175.0 ft
Serviced Lines / Cables
Pulled out of hole to 5165.0 ft
Pulled out of hole to 0.0 ft
Retrieved Wear bushing
Tested All functions
Serviced Drillfloor / Derrick
Facility
End MPI
Progress Report
Well 1-47A/M-20 Page
Rig Doyon 15 Date
9
18 February 98
Date/Time
25 Dec 97
26 Dec 97
27 Dec 97
28 Dec 97
14:30-15:00
15:00-19:00
19:00-19:30
19:30-21:30
21:30-22:00
22:00-22:30
22:30-00:30
00:30-02:30
02:30-06:00
06:00-07:00
07:00-07:30
07:30-08:30
08:30-13:00
13:00-15:00
15:00-18:00
18:00-19:30
19:30-22:00
22:00-23:00
23:00-00:30
00:30-01:00
01:00-02:30
02:30-03:00
03:00-03:30
03:30-06:00
06:00-10:30
10:30-11:00
11:00-11:30
11:30-12:30
12:30-16:30
16:30-18:00
18:00-18:30
18:30-22:00
22:00-22:30
22:30-00:30
00:30-01:30
01:30-03:00
03:00-06:00
06:00-07:00
07:00-09:00
09:00-09:30
09:30-10:00
10:00-14:30
14:30-18:00
18:00-22:00
22:00-22:30
22:30-02:00
02:00-02:30
02:30-03:30
03:30-04:00
04:00-04:30
04:30-06:00
06:00-07:30
07:30-08:30
08:30-09:30
Duration
1/2 hr
4hr
1/2 hr
2hr
1/2 hr
1/2hr
2hr
2hr
3-1/2 hr
lhr
1/2 hr
lhr
4-1/2 hr
2hr
3hr
1-1/2 hr
2-1/2 hr
lhr
1-1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
lhr
4hr
1-1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
2hr
lhr
1-1/2 hr
3hr
lhr
2hr
1/2 hr
1/2hr
4-1/2 hr
3-1/2 hr
4hr
1/2hr
3-1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
lhr
lhr
Activity
Rigged up sub-surface equipment - Cement retainer
Ran Drillpipe in stands to 11500.0 ft
Set packer at 11495.0 ft with 0.0 psi
Circulated at 11495.0 ft
Mixed and pumped slurry - 35.000 bbl
Displaced slurry - 160.500 bbl
Circulated at 11495.0 ft
Circulated at 11495.0 ft
Pulled out of hole to 3000.0 ft
Pulled out of hole to 0.0 ft
Serviced Draw works
Made up BHA no. 17
R.I.H. to 11495.0 ft
Drilled installed equipment - Cement retainer
Washed to 12137.0 ft
Drilled cement to 12175.0 ft
Circulated at 12175.0 ft
Serviced Block line
Pulled out of hole to 7750.0 ft
Circulated at 7750.0 ft
Pulled out of hole to 960.0 ft
Pulled BHA
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Conducted electric cable operations
Rigged down Wireline units
Serviced Top drive
Made up BHA no. 16
R.I.H. to 12175.0 ft
Drilled installed equipment - Bridge plug
R.I.H. to 12579.0 ft
Drilled installed equipment - Cement retainer
Drilled installed equipment - Float shoe
Reamed to 12702.0 ft
Repaired Top drive
Reamed to 12894.0 ft
Repaired Top drive
R.I.H. to 12894.0 ft
Reamed to 13086.0 ft
Circulated at 13086.0 ft
Worked stuck pipe at 13086.0 ft
Circulated at 7068.0 ft
Pulled out of hole to 0.0 ft
R.I.H. to 7000.0 ft
Fished at 7080.0 ft
Pulled out of hole to 6017.0 ft
Laid down 31.0 ft of 3-1/2in OD drill pipe
Pulled out of hole to 900.0 ft
Pulled BHA
Made up BHA no. 17
R.I.H. to 7750.0 ft
R.I.H. to 12579.0 ft
Serviced Block line
Circulated at 12579.0 ft
Facility
End MPI
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
10
18 February 98
Date/Time
29 Dec 97
30 Dec 97
31 Dec 97
01 Jan 98
02 Jan 98
09:30-10:00
10:00-11:00
11:00-11:30
11:30-14:00
14:00-18:00
18:00-19:30
19:30-23:00
23:00-00:30
00:30-01:00
01:00-02:00
02:00-02:30
02:30-03:00
03:00-04:00
04:00-05:00
05:00-06:00
06:00-07:30
07:30-11:30
11:30-12:00
12:00-13:00
13:00-16:00
16:00-19:30
19:30-23:30
23:30-00:30
00:30-04:30
04:30-05:30
05:30-06:00
06:00-07:30
07:30-08:30
08:30-09:30
09:30-10:00
10:00-11:00
11:00-14:00
14:00-15:00
15:00-16:30
16:30-17:30
17:30-21:00
21:00-22:00
22:00-23:30
23:30-06:00
06:00-14:00
14:00-06:00
06:00-07:00
07:00-09:30
09:30-12:00
12:00-12:30
12:30-15:30
15:30-17:00
17:00-17:30
17:30-20:00
20:00-20:30
20:30-00:00
00:00-01:00
01:00-01:30
01:30-02:30
Duration
1/2 hr
lhr
1/2 hr
2-1/2 hr
4hr
1-1/2 hr
3-1/2 hr
1-1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
lhr
lhr
lhr
1-1/2 hr
4hr
1/2 hr
lhr
3hr
3-1/2 hr
4hr
lhr
4hr
lhr
1/2 hr
1-1/2 hr
lhr
lhr
1/2 hr
lhr
3hr
lhr
1-1/2 hr
lhr
3-1/2 hr
lhr
1-1/2 hr
6-1/2 hr
8hr
16hr
lhr
2-1/2 hr
2-1/2 hr
1/2 hr
3hr
1-1/2 hr
1/2hr
2-1/2 hr
1/2 hr
3-1/2 hr
lhr
1/2 hr
lhr
Activity
R.I.H. to 12894.0 ft
Reamed to 12930.0 ft
Pulled out of hole to 12579.0 ft
Circulated at 12579.0 ft
Pulled out of hole to 900.0 ft
Pulled BHA
Ran Drillpipe in stands to 12579.0 ft
Washed to 12935.0 ft
Circulated at 12906.0 ft
Circulated at 12871.0 ft
Mixed and pumped slurry - 60.000 bbl
Displaced slurry - 145.000 bbl
Pumped out of hole to 11442.0 ft
Reverse circulated at 11442.0 ft
Circulated at 11442.0 ft
Circulated at 11442.0 ft
Pulled out of hole to 0.0 ft
Serviced Top drive
Made up BHA no. 18
R.I.H. to 11442.0 ft
Washed to 12650.0 ft
Circulated at 12579.0 ft
Serviced Block line
Pulled out of hole to 900.0 ft
Pulled BHA
Made up BHA no. 18
Made up BHA no. 19
R.I.H. to 2000.0 ft
Tested MWD - Via string
Pulled out of hole to 171.0 ft
Tested MWD - Via string
R.I.H. to 5543.0 ft
Singled in drill pipe to 6691.0 ft
R.I.H. to 12303.0 ft
Washed to 12590.0 ft
Cleared Trip tank
Fill pits with Water based mud
Circulated at 12590.0 ft
Circulated at 12590.0 ft
Circulated at 12691.5 ft
Drilled to 12851.5 ft
Drilled to 12910.5 ft
Circulated at 12910.5 ft
Pulled out of hole to 8350.5 ft
Flow check
Pulled out of hole to 232.5 ft
Pulled BHA
Retrieved Wear bushing
Tested All functions
Installed Wear bushing
Ran Drillpipe in stands to 12620.5 ft
Serviced Block line
Ran Drillpipe in stands to 12910.5 ft
Circulated at 12910.5 ft
Facility
Date/Time
03 Jan 98
04 Jan 98
05 Jan 98
06 Jan 98
07 Jan 98
08 Jan 98
09 Jan 98
End MPI
02:30-02:45
02:45-03:00
03:00-03:30
03:30-04:30
04:30-06:00
06:00-10:30
10:30-12:00
12:00-16:30
16:30-17:00
17:00-00:30
00:30-06:00
06:00-06:00
06:00-11:30
11:30-11:45
11:45-12:00
12:00-12:15
12:15-16:30
16:30-17:30
17:30-18:00
18:00-19:30
19:30-20:00
20:00-21:00
21:00-21:15
21:15-00:00
00:00-01:00
01:00-01:30
01:30-06:00
06:00-16:30
16:30-18:30
18:30-19:00
19:00-19:15
19:15-23:30
23:30-00:30
00:30-01:30
01:30-02:15
02:15-02:30
02:30-06:00
06:00-06:00
06:00-15:00
15:00-16:00
16:00-21:30
21:30-00:00
00:00-06:00
06:00-08:00
08:00-09:30
09:30-10:00
10:00-11:00
11:00-04:00
04:00-06:00
06:00-06:30
06:30-07:00
07:00-08:00
08:00-11:00
11:00-12:00
Duration
1/4hr
1/4 hr
1/2 hr
lhr
1-1/2 hr
4-1/2 hr
1-1/2 hr
4-1/2 hr
1/2 hr
7-1/2 hr
5-1/2 hr
24 hr
5-1/2 hr
1/4 hr
1/4 hr
1/4 hr
4-1/4 hr
lhr
1/2 hr
1-1/2 hr
1/2 hr
lhr
1/4 hr
2-3/4 hr
lhr
1/2 hr
4-1/2 hr
10-1/2 hr
2hr
1/2hr
1/4 hr
4-1/4 hr
lhr
lhr
3/4 hr
1/4 hr
3-1/2 hr
24 hr
9hr
lhr
5-1/2 hr
2-1/2 hr
6hr
2hr
1-1/2 hr
1/2hr
lhr
17 hr
2hr
1/2 hr
1/2hr
lhr
3hr
lhr
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Activity
Held safety meeting
Mixed and pumped slurry - 37.000 bbl
Displaced slurry - 143.000 bbl
Pulled Drillpipe in stands to 11741.5 ft
Reverse circulated at 11741.5 ft
Pulled out of hole to 0.0 ft
Made up BHA no. 20
R.I.H. to 11700.0 ft
Washed to 11966.0 ft
Drilled cement to 12589.0 ft
Drilled to 12600.0 ft
Drilled to 12700.0 ft
Drilled to 12724.0 ft
Flow check
Pulled out of hole to 12500.0 ft
Circulated at 12500.0 ft
Pulled out of hole to 191.0 ft
Downloaded MWD tool
Pulled BHA
Made up BHA no. 21
Serviced Draw works
R.I.H. to 2000.0 ft
Tested M.W.D. tool - Via string
R.I.H. to 12579.0 ft
Serviced Block line
R.I.H. to 10724.0 ft
Drilled to 12740.0 ft
Drilled to 12779.0 ft
Circulated at 12779.0 ft
Pulled out of hole to 12579.0 ft
Circulated at 12779.0 ft
Pulled out of hole to 191.0 ft
Pulled BHA
Made up BHA no. 22
R.I.H. to 2000.0 ft
Tested MWD - Via string
R.I.H. to 12779.0 ft
Drilled to 12975.0 ft
Drilled to 13171.0 ft (cont...)
Circulated at 13171.0 ft
Drilled to 13307.0 ft
Repaired Draw works
Drilled to 13550.0 ft
Drilled to 13595.0 ft
Circulated at 13595.0 ft
Pulled out of hole to 12580.0 ft
R.I.H. to 13595.0 ft
Drilled to 14075.0 ft
Circulated at 14075.0 ft
Circulated at 14075.0 ft
Pulled out of hole to 12580.0 ft
R.I.H. to 14075.0 ft
Circulated at 14075.0 ft
Pulled out of hole to 12579.0 ft
Page
Date
11
18 February 98
Facility
Date/Time
10 Jan 98
11 Jan 98
12 Jan 98
13 Jan 98
14 Jan 98
15 Jan 98
End MPI
12:00-12:30
12:30-15:00
15:00-18:00
18:00-22:30
22:30-02:00
'02:00-03:30
03:30-04:30
04:30-05:00
05:00-06:00
06:00-10:00
10:00-13:00
13:00-14:00
14:00-15:00
15:00-16:30
16:30-21:00
21:00-01:00
01:00-05:00
05:00-06:00
06:00-12:00
12:00-13:00
13:00-14:00
14:00-15:30
15:30-18:00
18:00-20:00
20:00-23:00
23:00-01:00
01:00-02:30
02:30-04:30
04:30-06:00
06:00-11:00
11:00-17:30
17:30-18:00
18:00-18:30
18:30-23:30
23:30-02:30
02:30-03:30
03:30-05:00
05:00-06:00
06:00-07:30
07:30-15:00
15:00-16:00
16:00-21:30
21:30-02:30
02:30-06:00
06:00-07:00
07:00-07:30
07:30-18:00
18:00-19:00
19:00-21:00
21:00-22:30
22:30-01:30
01:30-02:00
02:00-03:30
03:30-04:00
Duration
1/2hr
2-1/2 hr
3hr
4-1/2 hr
3-1/2 hr
1-1/2 hr
lhr
1/2 hr
lhr
4hr
3hr
lhr
lhr
1-1/2 hr
4-1/2 hr
4hr
4hr
lhr
6hr
lhr
lhr
1-1/2 hr
2-1/2 hr
2hr
3hr
2hr
1-1/2 hr
2hr
1-1/2 hr
5hr
6-1/2 hr
1/2 hr
1/2hr
5hr
3hr
lhr
1-1/2 hr
lhr
1-1/2 hr
7-1/2 hr
lhr
5-1/2 hr
5hr
3-1/2 hr
lhr
1/2 hr
10-1/2 hr
lhr
2hr
1-1/2 hr
3hr
1/2 hr
1-1/2 hr
1/2hr
Progress Report
Well 1-47MM-20
Rig Doyon 15
Activity
Circulated at 12579.0 ft
Pulled out of hole to 6718.0 ft
Pulled BHA
Ran Liner to 2764.0 ft (4-1/2in OD)
Ran Drillpipe in stands to 9263.0 ft
Ran Drillpipe in stands to 12523.0 ft
Circulated at 12523.0 ft
Rigged up Drillstring handling equipment
Ran Drillpipe in stands to 13186.0 £t
Washed to 14075.0 ft
Circulated at 14075.0 ft
Mixed and pumped slurry - 70.000 bbl
Displaced slurry - 124.000 bbl
Circulated at 11316.0 ft
Pulled Drillpipe in stands to 0.0 ft
Tested BOP stack
Laid out 5in drill pipe from derrick
Ran Drillpipe to 250.0 ft (2-7/8in OD)
Ran Drillpipe to 3148.0 ft (2-7/8in OD)
Circulated at 3148.0 ft
Serviced Block line
Ran Drillpipe in stands to 6685.0 ft
Ran Drillpipe in stands to 13834.0 ft
Washed to 13982.0 fl
Circulated at 13985.0 ft
Pulled Drillpipe in stands to 6685.0 ft
Pulled Drillpipe in stands to 3148.0 ft
Pulled Drillpipe in stands to 0.0 ft
Conducted electric cable operations
Conducted electric cable operations (cont...)
Ran Drillpipe in stands to 11317.0 ft
Set packer at 11317.0 ft with 3800.0 psi
Tested Casing
Pulled out of hole to 0.0 ft
Made up BHA no. 23
Serviced Block line
R.I.H. to 13985.0 ft
Circulated at 13985.0 ft
Circulated at 13985.0 ft (cont...)
Reverse circulated at 13985.0 ft
Cleared Flowline
Reverse circulated at 13985.0 ft
Pulled out of hole to 6497.0 ft
Pulled out of hole to 0.0 ft
Rigged down Drillfloor / Derrick
Removed Wear bushing
Ran Tubing to 8217.0 ft (4-1/2in OD)
Rigged up Instrument lines
Ran Tubing to 9739.0 ft (4-1/2in OD)
Installed Tubing hanger
Reverse circulated at 9739.0 ft
Page
Date
Set Production packer at 9683.0 ft with 2500.0 psi
Tested Tubing
Installed Hanger plug
12
18 February 98
Facility
Date/Time
End MPI
Progress Report
Well 1-47A/M-20
Rig Doyon 15
Page
Date
04:00-06:00
06:00-07:00
07:00-09:30
09:30-13:00
13:00-15:00
15:00-16:00
Duration
2hr
lhr
2-1/2 hr
3-1/2 hr
2hr
lhr
Activity
Removed BOP stack
Removed BOP stack (cont...)
Installed Wellhead integral components
Freeze protect well - 34.000 bbl of Diesel
Cleared Trip tank
Skid rig
13
18 February 98
WSA- Well Operations Telex
To:
From:
Operation:
Date:
Cost Code:
Anchorage Engineering
Luecker
Endicott 1-47 CT CONVEYED GR/CCL LOG/PERF JOB
Jan. 24, 1998
727015
Summary
RIH with PDS's GR/CCL memory tool. Did not tag TD. Logged from flag at 13500 to 11150. Log was was 14' deep to
the MWD log of Sperry Sun. POOH and pick up 20' SWS 2 7/8" 6 spf HSD gun. 34j charges. Flag was placed at
13500 on CT counter while logging; this would place the hydraulic disconnect at 13504.6' reference MWD log. Caught
flag and pulled up to 13453 placing gun #1 at 13458-13478 interval. Gun deployed after ball on seat with 30 bbl and
sheared at 4300 psi. WHP slowly dropped from SIWHP of 300. POOH. Laid down for night and wait for slickline to run
static survey.
Rig back up following static and RIH with gun #2, same as gun #1. Perforated 12930-1~950 interval. POOH and blow
coil down with N2 in preparation of welding more pipe for perforating job on Endicott 2-46.
Time Operation
1/24
08:30 Start rigging up to run gr/ccl correlation log for initial perforation correclation.
10:00 Pick up PDS gr/ccl toolstring.
11:20 Start filling coil with 33 bbl. meth press test 4400.
12:11 Start RIH, pumping diesel.
12:57 33 bbl diesel away, coil at 4600'
14:42 Start logging gr/ccl @ 50 fpm from 13900, intentionally did not tag TD, stopped and placed flag at 13,499'
continue logging OOH. Log 14' shallow to Sperry Sun's MWD log placing corrected Hyd. Dis. At 13504' when
ct is at flag.
16:56 OOH, wait on SWS gun.
19:00 Pick up 20' 2 7/8" HSD gun loaded 6 spf with 34j charges. 60 degree phasing random orientation. Hyd disc to
ts-5.1'
19:30 Press test 2000, RIH.
22:26 Catch flag 13523, reset to 13504.6, pull up to 13453 placing gun at 13458-13478 interval reference MWD log.
22:46 Drop ball. 20 bbl away ball on seat. S/I well, SlWHP-300 on ct guage.
1/24
0:04 29 BBL away, .35 bpm 4350 coil pressure, 300 whp, 3100 differential, gun deployed. WHP-280. POOH.
1:40 Pump 10 bbl diesel down b/s.
03:00 OOH, all shots fired. Rig back for s/I.
14:30 S/L done with survey. Start rigging back up.
15:30 Pick up gun @2, same as gun #1. Pressure test 2500.
16:04 SIWHP-0, RIH
16:17 Well pressuring up, open down flowline.
18:21 Chains slipping, catch flag at 13529, reset to 13504, pull up to 12925 placing gun across 12930-12950 interval.
18:58 Drop ball, start pumping diesel. Ball on seat @ 27 bbl.
Endicott 2-46B CT Conveyed Perf, 02/20/98
19:31 Gun deployed @4400 psi
21:15 OOH, bleed down. Start cooling down N2 pumper.
21:58 Lay down guns.
22:35 Start pumping N2.
23:20 Finish N2, Rd. Use 30k feet of N2. Including cool down.
BBLS. Fluid Summary
100 Diesel
35 Methanol
BHA #1
Tool string Description II O.D. I .D. II Length II Comments
Fishing Neck 2.125" .92" 1.37'
Check Valve 2.125" .812 1.36'
Hydraulic Disconnect 2.125" .687 1.55
1 3/8" reg x 1 1/2 MT x/o 2.125" .35'
1 1/2" x 3A" s.r.x/o 2.125" .50'
PDS Toolstring 1.875" 7.83 GR/CCL
cci to disconnect 9.4'
BHA #2 and 3
Tool string Description II II I.D. II Length II Comments
Fishing Neck 2.125" .92" 1.37'
Check Valve 2.125" .812 1.36'
Hydraulic Disconnect 2.125" .687 1.55
Baker crossover 2.125 .27'
SWS x/o and firing head 2.125" 4.20 5/8" ball
2 7/8" gun 2.875" 20.59
Endicott 2-46B CT Conveyed Perf, 02/20/98
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE i
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/M-20
500292162501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/11/98
DATE OF SURVEY: 010998
MWD SURVEY
JOB NUMBER: akn~m80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
12559.80 10078.98 10023.78 72 55 N 67.40 E .00
12563.00 10079.92 10024.72 73 5 N 67.66 E 9.60
12589.00 10087.61 10032.41 72 30 N 62.84 E 17.85
12605.54 10092.62 10037.42 72 10 N 65.58 E 15.91
12637.13 10102.09 10046.89 72 56 N 70.80 E 15.95
514.20N 2668.81E 2641.75
515.37N 2671.64E 2644.81
525.76N 2694.19E 2669.64
532.62N 2708.38E 2685.39
543.81N 2736.35E 2715.48
12657.99 10107.95 10052.75 74 28 N 74.22 E 17.34
12692.28 10116.61 10061.41 76 16 N 77.45 E 10.52
12726.66 10124.48 10069.28 77 16 N 81.17 E 10.93
12751.94 10130.22 10075.02 76 29 N 83.92 E 11.05
12787.71 10138.60 10083.40 76 23 N 87.29 E 9.16
549.82N 2755.44E 2735.35
557.94N 2787.61E 2767.99
564.14N 2820.49E 2800.48
567.34N 2844.90E 2824.02
570.00N 2879.56E 2856.67
12819.05 10145.92 10090.71 76 37 N 87.84 E 1.87
12850.45 10152.99 10097.79 77 18 N 88.63 E 3.27
12884.10 10160.33 10105.13 77 30 N 89.19 E 1.72
12913.19 10166.43 10111.23 78 17 S 89.49 E 5.20
12944.41 10172.72 10117.52 78 28 S 89.18 E 1.15
571.30N 2910.01E 2884.91
572.24N 2940.58E 2913.12
572.86N 2973.42E 2943.26
572.94N 3001.86E 2969.17
572.58N 3032.44E 2996.85
12977.10 10178.83 10123.63 79 56 S 87.66 E 6.41
13009.29 10184.09 10128.89 81 15 S 84.52 E 10.45
13039.68 10188.69 10133.49 81 19 S 83.66 E 2.81
13072.83 10193.66 10138.46 81 25 S 81.33 E 6.95
13105.58 10198.53 10143.33 81 28 S 77.92 E 10.30
571.70N 3064.53E 3025.68
569.53N 3096.21E 3053.61
566.44N 3126.09E 3079.52
562.16N 3158.58E 3107.31
556.32N 3190.43E 3133.87
13136.97 10203.25 10148.05 81 12 S 77.04 E 2.90
13170.85 10208.51 10153.31 80 56 S 74.04 E 8.78
13232.40 10218.21 10163.01 80 55 S 73.93 E .18
13328.21 10233.20 10178.00 81 4 S 73.04 E .93
13425.50 10249.00 10193.80 80 14 S 73.18 E .87
549.60N 3220.72E 3158.65
541.24N 3253.13E 3184.67
524.47N 3311.55E 3230.88
497.57N 3402.27E 3302.28
469.68N 3494.13E 3374.30
13519.42 10265.17 10209.96 79 56 S 73.32 E .35
13614.77 10281.96 10226.76 79 46 S 72.61 E .75
13711.98 10298.82 10243.62 80 15 S 71.91 E .87
13805.53 10314.03 10258.83 81 1 S 71.00 E 1.26
13904.64 10328.64 10273.44 82 1 S 71.25 E 1.05
443.02N 3582.72E 3443.86
415.52N 3672.46E 3514.11
386.35N 3763.64E 3584.99
357.00N 3851.15E 3652.44
325.29N 3943.90E 3723.69
14000.28 10343.69 10288.49 79 50 S 71.44 E 2.29
14075.00 10356.86 10301.66 79 50 S 71.44 E .00
295.08N 4033.37E 3792.58
27t.67N 4i03.t0E 3846.32
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4112.08 FEET
AT NORTH 86 DEG. 12 MIN. EAST AT MD = 14075
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 65.50 DEG.
TIE-IN SURVEY AT 12,559.80
WINDOW POINT AT 12,589.00' MD
PROJECTED SURVEY AT 14,075.00' MD
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
ENDICOTT / !-47A/M-20
500292162501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/11/98
DATE OF SURVEY: 010998
JOB NUMBER: akmm80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
12559.80 10078.98 10023.78
13559.80 10272.22 10217.02
14075.00 10356.86 10301.66
514.20 N 2668.81 E 2480.82
431.61 N 3620.81 E 3287.58 806.76
271.67 N 4103.10 E 3718.14 430.56
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/M-20
500292162501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/11/98
DATE OF SURVEY: 010998
JOB NUMBER: akmm80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
12559.80 10078.98 10023.78
12860.49 10155.20 10100.00
13462.02 10255.20 10200.00
14075.00 10356.86 10301.66
514.20 N 2668.81 E 2480.82
572.47 N 2950.38 E 2705.29 224.47
459.27 N 3528.58 E 3206.82 501.53
271.67 N 4103.10 E 3718.14 511.32
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB2
500292162571
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 121597
MWD SURVEY
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
12559.80 10078.98 10023.78 72 55 N 67.40 E .00
12563.00 10079.92 10024.72 73 5 N 67.66 E 9.60
12607.53 10093.23 10038.03 72 10 N 59.40 E 17.82
12645.32 10104.05 10048.85 74 33 N 56.79 E 9.15
12675.09 10111.82 10056.62 75 t0 N 58.09 E 4.70
514.20N 2668.81E 2641.75
515.37N 267i.64E 2644.81
534.29N 2709.65E 2687.24
553.42N 2740.38E 2723.14
568.89N 2764.60E 2751.59
12707.63 10119.68 10064.48 76 52 N 62.04 E 12.89
12739.67 10126.79 10071.59 77 26 N 65.35 E 10.23
12770.46 10133.34 10078.14 77 59 N 68.01 E 8.62
12801.76 10140.19 10084.99 76 45 N 71.14 E 10.52
12835.06 10148.02 10092.82 76 3 N 75.24 E 12.16
584.64N 2791.96E 2783.02
598.48N 2819.96E 2814.24
610.39N 2847.58E 2844.31
621.05N 2876.20E 2874.78
630.41N 2907.18E 2906.84
12865.75 10155.50 10100.30 75 43 N 79.21 E 12.59
12899.17 10163.51 10108.31 76 32 N 82.89 E 10.96
12929.98 10170.58 10115.38 76 55 N 87.08 E 13.30
12961.45 10177.25 10122.05 78 36 S 89.32 E 12.39
12999.95 10184.14 10128.94 80 46 S 87.66 E 7.05
636.99N 2936.20E 2935.98
642.03N 2968.24E 2967.23
644.65N 2998.11E 2995.50
645.25N 3028.85E 3023.72
644.25N 3066.71E 3057.76
13085.00 10197.77 10142.57 80 46 S 87.66 E .00 640.82N 3150.59E 3132.66
THE cALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 3215.11 FEET
AT NORTH 78 DEG. 30 MIN. EAST AT MD = 13085
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 65.50 DEG.
TIE-IN SURVEY AT 12,559.80' MD
WINDOW POINT AT 12,563.00' MD
PROJECTED SURVEY AT 13,085.00' MD
ORISIP AL
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB2
500292162571
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 121597
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
12559.80 10078.98 10023.78
13085.00 10197.77 10142.57
514.20 N 2668.81 E 2480.82
640.82 N 3150.59 E 2887.23 406.41
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB2
500292162571
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 121597
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
12559.80 10078.98 10023.78
12864.54 10155.20 10100.00
12899.80 10163.66 10108.46
514.20 N 2668.81 E 2480.82
636.70 N 2935.06 E 2709.34 228.52
642.11 N 2968.85 E 2736.14 26.80
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB1
500292162570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 120797
MWD SURVEY
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
8419.90 8042.95 7987.75 39 13
8429.00 8050.01 7994.81 39 0
8449.00 8065.64 8010.44 38 12
8484.50 8093.15 8037.95 40 12
8513.51 8114.78 8059.58 43 24
S 20.47 E .00 1440.96S 179.46E -434.25
S 21.46 E 7.28 1446.32S 181.51E -434.61
S 24.20 E 9.44 1457.82S 186.35E -434.97
S 28.40 E 9.36 1477.91S 196.30E -434.25
S 31.70 E 13.38 1494.63S 206.00E -432.37
8545.60 8137.47 8082.27 46 35
8578.80 8160.14 8104.94 47 17
8610.20 8181.75 8126.55 45 42
8641.60 8204.05 8148.85 43 47
8673.90 8227.88 8172.68 41 5
S 35.80 E 13.45 1513.48S 218.61E -428.70
S 38.40 E 6.10 1532.82S 233.25E -423.40
S 41.10 E 8.05 1550.33S 247.80E -417.42
S 45.00 E 10.63 1566.49S 262.88E -410.41
S 45.80 E 8.52 1581.80S 278.39E -402.63
8705.60 8252.14 8196.94 39 5
8736.20 8276.11 8220.91 37 47
8768.90 8302.27 8247.07 35 54
8801.30 8328.62 8273.42 35 17
8831.00 8352.93 8297.73 34 47
S 50.60 E 11.61 1595.41S 293.59E
S 55.20 E 10.27 1606.89S 308.75E
S 57.50 E 7.18 1617.76S 325.07E
S 62.90 E 9.87 1627.13S 341.42E
S 67.10 E 8.29 1634.34S 356.86E
-394.45
-385.41
-375.07
-364.08
-353.02
8865.00 8380.90 8325.70 34 35
8897.20 8407.33 8352.13 35 5
8927.60 8432.26 8377.06 34 47
8961.60 8460.38 8405.18 33 35
8993.80 8487.16 8431.96 33 54
S 74.30 E 12.06
S 80.20 E t0.58
S 86.60 E 12.10
N 88.10 E 9.44
N 83.30 E 8.33
1640.73S 375.10E -339.07
1644.78S 393.03E -324.44
1646.78S ' 410.31E -309.54
1647.04S 429.40E -292.28
1645.70S 447.23E -275.50
9025.40 8513.13 8457.93 35 35
9057.70 8539.08 8483.88 37 30
9088.90 8563.72 8508.52 38 12
9121.00 8588.80 8533.60 39 0
9156.10 8616.37 8561.17 37 30
9175.22 8631.58 8576.38 37 7
9204.49 8654.78 8599.58 38 0
9237.25 8680.51 8625.31 38 31
9268.88 8705.02 8649.82 39 54
9299.72 8728.32 8673.12 41 55
9334.02 8753.69 8698.49 42 39
9365.68 8776.84 8721.64 43 22
9394.77 8798.05 8742.85 42 59
9427.88 8821.90 8766.70 44 52
9459.19 8844.08 8788.88 44 55
N 79.60 E 8.57
N 76.00 E 8.87
N 71.70 E 8.75
N 68.10 E 7.43
N 63.90 E 8.55
N 63.68 E 2.11
N 60.56 E 7.16
N 55.10 E 10.44
N 53.20 E 5.78
N 51.21 E 7.82
N 50.98 E 2.15
N 48.97 E 4.91
N 47.79 E 3.08
N 44.86 E 8.36
N 44.06 E 1.81
1643.01S 465.03E -258.19
1638.94S 483.82E -239.40
1633.61S 502.20E -220.47
1626.72S 520.99E -200.51
1617.90S 540.84E -178.79
1612.78S 551.24E -167.21
1604.44S 567.00E -149.40
1593.64S 584.15E -129.32
1581.93S 600.35E -109.72
1569.55S 616.31E -90.07
1555.06S 634.27E -67.71
1541.17S 650.80E -46.91
1527.95S 665.68E -27.88
1512.08S 682.29E -6.20
1496.30S 697.77E 14.43
o GINAL
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB1
500292162570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 120797
MWD SURVEY
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
9491.57 8866.95 8811.75 45 12 N 43.34 E 1.78 1479.73S 713.60E 35.71
9523.67 8889.48 8834.28 45 38 N 41.43 E 4.45 1462.85S 729.01E 56.74
9556.28 8911.95 8856.75 47 13 N 42.36 E 5.30 1445.26S 744.79E 78.39
9586.86 8932.26 8877.06 49 30 N 43.38 E 7.83 1428.52S 760.34E 99.48
9619.14 8952.65 8897.45 52 10 N 43.98 E 8.40 1410.42S 777.62E 122.71
9650.34 8971.11 8915.91 55 14 N 43.23 E 10.03 1392.21S 794.96E 146.04
9681.29 8988.17 8932.97 57 52 N 44.12 E 8.83 1373.54S 812.80E 170.02
9714.69 9005.44 8950.24 59 50 N 44.02 E 5.93 1353.00S 832.68E 196.62
9745.30 9020.46 8965.26 61 22 N 44.22 E 5.03 1333.86S 851.24E 221.46
9774.74 9034.00 8978.79 63 50 N 44.35 E 8.40 1315.15S 869.49E 245.82
9870.93 9070.30 9015.10 71 45 N 44.22 E 8.22 1251.44S 931.62E 328.78
9966.48 9098.22 9043.02 74 15 N 44.77 E 2.66 1186.28S 995.65E 414.07
10060.87 9123.39 9068.19 74 49 N 44.33 E .75 1121.45S 1059.47E 499.02
10155.07 9149.05 9093.85 73 34 N 45.33 E 1.67 t057.17S 1123.36E 583.82
10249.15 9177.84 9122.64 70 47 N 44.27 E 3.14 993.63S 1186.47E 667.59
10344.74 9210.14 9154.94 69 42 N 43.45 E 1.39
10441.33 9243.98 9188.78 69 16 N 42.87 E .72
10537.95 9276.94 9221.74 70 50 N 40.34 E 2.95
10633.82 9310.47 9255.27 68 13 N 40.22 E 2.74
10730.01 9345.52 9290.32 69 1 N 39.52 E 1.08
928.76S 1248.81E 751.21
862.77S 1310.69E 834.89
794.86S 1370.98E 917.92
726.35S 1429.05E 999.16
657.60S 1486.46E 1079.92
10826.53 9380.71 9325.51 68 15 N 45.68 E 6.00
10920.82 9415.92 9360.72 67 54 N 45.91 E .43
11017.04 9450.96 9395.76 69 22 N 45.06 E 1.74
11113.39 9485.50 9430.29 68 36 N 45.05 E .80
11210.62 9520.70 9465.50 68 56 N 43.67 E 1.37
591.47S 1547.26E 1162.67
530.48S 1609.96E 1245.02
467.66S 1673.85E 1329.20
404.12S 1737.51E 1413.48
339.32S 1800.88E 1498.01
11306.56 9557.04 9501.84 66 31 N 42.87 E 2.63
11402.25 9596.75 9541.55 64 25 N 41.06 E 2.79
11495.97 9638.06 9582.86 63 15 N 38.80 E 2.50
11592.78 9683.03 9627.83 61 23 N 42.18 E 3.65
11687.60 9727.82 9672.62 62 13 N 42.79 E 1.05
274.70S 1861.72E 1580.18
209.98S 1919.94E 1660.00
145.49S 1973.93E 1735.86
80.29S 2029.57E 1813.53
18.66S 2086.01E 1890.45
11785.05 9772.69 9717.49 62 56 N 42.01 E 1.02
11878.88 9815.33 9760.13 63 0 N 42.36 E .34
11973.94 9858.35 9803.15 63 11 N 42.01 E .38
12069.60 9900.28 9845.08 64 48 N 42.64 E 1.79
12163.92 9940.16 9884.96 65 10 N 43.68 E 1.07
45.22N 2144.34E 1970.02
107.15N 2200.46E 2046.77
169.96N 2257.39E 2124.62
233.52N 2315.28E 2203.65
295.87N 2373.74E 2282.71
SPERRY-SUN DRILLING SERVICES
ANCHOP~tGE ALAS K~
PAGE 3
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB1
500292162570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 120797
MWD SURVEY
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
12208.12 9958.61 9903.41 65 27 N 43.42 E .85
12241.57 9971.98 9916.78 67 25 N 43.60 E 5.91
12273.03 9983.47 9928.27 69 43 N 46.49 E 11.23
12302.97 9993.35 9938.15 71 44 N 48.35 E 8.94
12337.05 10004.15 9948.95 71 19 N 51.33 E 8.38
324.97N 2401.41E 2319.96
347.21N 2422.52E 2348.39
367.89N 2443.25E 2375.82
387.01N 2464.06E 2402.69
407.86N 2488.76E 2433.81
12369.31 10014.75 9959.55 70 19 N 52.99 E 5.75
12398.91 10024.92 9969.72 69 27 N 55.46 E 8.37
12432.34 10036.96 9981.76 68 19 N 58.04 E 7.95
12461.96 10047.60 9992.40 69 34 N 61.00 E 10.22
12495.46 10058.76 10003.56 71 30 N 63.21 E 8.50
426.55N 2512.82E 2463.45
442.79N 2535.36E 2490.70
459.89N 2561.44E 2521.52
473.91N 2585.26E 2549.01
488.68N 2613.17E 2580.54
12528.11 10069.17 10013.97 71 18 N 65.50 E 6.68
12559.80 10078.90 10023.70 72 55 N 67.40 E 7.64
12591.22 10087.64 10032.44 74 46 N 70.01 E 9.93
12624.33 10096.22 10041.02 75 11 N 73.09 E 9.07
12657.43 10104.59 10049.39 75 32 N 76.13 E 8.95
502.07N 2641.07E 2611.47
514.12N 2668.71E 2641.62
525.08N 2696.82E 2671.75
535.19N 2727.16E 2703.55
543.69N 2758.03E 2735.16
12687.40 10112.33 10057.13 74 32 N 76.79 E 3.96
12720.18 10121.33 10066.13 73 33 N 79.08 E 7.35
12751.63 10130.38 10075.18 73 1 N 82.32 E 10.01
12782.92 10139.50 10084.29 73 4 N 84.91 E 7.92
12815.18 10148.46 10093.26 74 39 N 87.18 E 8.33
550.47N 2786.18E 2763.59
557.06N 2816.99E 2794.36
561.93N 2846.71E 2823.43
565.25N 2876.45E 2851.87
567.39N 2907.36E 2880.88
12845.69 10156.00 10100.80 76 43 N 87.73 E 7.04
12920.00 10171.62 10116.42 79 0 N 89.00 E 3.48
568.70N 2936.89E 2908.29
570.77N 3009.51E 2975.23
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 3063.15 FEET
AT NORTH 79 DEG. 15 MIN. EAST AT MD = 12920
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 65.50 DEG.
TIE-IN SURVEY AT 8,419.90' MD
WINDOW POINT AT 8,429.00' MD
PROJECTED SURVEY AT 12,920.00' MD
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB1
500292162570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 120797
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
8419.90 8042.95 7987.75
9419.90 8816.22 8761.02
10419.90 9236.39 9181.19
11419.90 9604.37 9549.17
12419.90 10032.41 9977.21
1440.96 S 179.46 E
1516.03 S 678.31 E
877.46 S 1297.05'E
197.97 S 1930.40 E
453.68 N 2551.67 E
376.95
603.68 226.73
1183.51 579.83
1815.53 632.03
2387.49 571.96
12920.00 10171.62 10116.42
570.77 N 3009.51 E 2748.38 360.89
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
SHARED SERVICES DRILLING
ENDICOTT / 1-47A/PB1
500292162570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 2/ 4/98
DATE OF SURVEY: 120797
JOB NUMBER: AKMM80017
KELLY BUSHING ELEV. = 55.20 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
8419.90 8042.95 7987.75
8435.70 8055.20 8000.00
8571.53 8155.20 8100.00
8709.51 8255.20 8200.00
1440.96 S 179.46 E 376.95
1450.32 S 182.96 E 380.50 3.55
1528.62 S 229.96 E 416.33 35.83
1596.88 S 295.53 E 454.31 37.98
8833.76 8355.20 8300.00
8955.36 8455.20 8400.00
9078.09 8555.20 8500.00
9205.03 8655.20 8600.00
9336.07 8755.20 8700.00
1634.89 S 358.33 E 478.56 24.25
1647.07 S 425.92 E 500.16 21.60
1635.60 S 495.84 E 522.89 22.73
1604.23 S 567.26 E 549.83 26.94
1554.18 S 635.35 E 580.87 31.04
9474.92 8855.20 8800.00
9623.39 8955.20 8900.00
9827.04 9055.20 9000.00
10176.37 9155.20 9100.00
10473.45 9255.20 9200.00
1488.29 S 705.48 E
1407.97 S 779.97 E
1280.95 S 902.87 E
1042.80 S 1137.83 E
840.56 S 1330.98 E
619.72 38.85
668.19 48.47
771.84 103.65
1021.17 249.33
1218.25 197.08
10756.89 9355.20 9300.00
11029.08 9455.20 9400.00
11301.94 9555.20 9500.00
11533.55 9655.20 9600.00
11746.60 9755.20 9700.00
638.52 S 1502.73 E
459.70 S 1681.83 E
277.80 S 1858.84 E
119.68 S 1995.20 E
19.77 N 2121.42 E
1401.69 183.44
1573.88 172.19
1746.74 172.86
1878.35 131.62
1991.40 113.04
11966.96 9855.20 9800.00
12199.90 9955.20 9900.00
12484.51 10055.20 10000.00
12842.24 10155.20 10100.00
12879.90 10163.55 10108.35
165.33 N 2253.22 E
319.54 N 2396.27 E
483.93 N 2603.98 E
568.56 N 2933.54 E
569.85 N 2970.24 E
2111.76 120.36
2244.70 132.94
2429.31 184.61
2687.04 257.72
2716.35 29.31
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
STATE OF ALASKA
ALAS )IL AND GAS CONSERVATION COMMIS£ .... .
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown__ Stimulate__ Plugging__
Pull tubing__ Alter casing __ Repair well __
Perforate X
Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchora.cle, Alaska 99519-6612
4. Location of well at surface
2146' SNL, 2169' WEL, SEC. 36, T12N, R16E, UPM
At top of productive interval
1635' SNL, 493' EWL, SEC. 31, T12N, R17E, UPM
At effective depth
1846' SNL, 1848' EWL, SEC 31, T12N, R17E, UPM
,.
At total depth
1874'SNL, 1934' EWL, SEC. 31, T12N, R17E, UPM
5. Type of Well:
Development ..
Exploratory ~
Stratigraphic __
Service __
6. Datum elevation (DF or KB)
KBE = 55.1' feet
7. Unit or Property name
Duck Island Unit/Endicott
8. Well number
1-4 7A/M-2 0
9. Permit number/approval number
97-203 / not required
10. APl number
50- 029-21625-01
11. Field/Pool
Endicott Field/Endicott Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
14075 feet
10357 feet
13983 feet
10341 feet
Plugs (measured)
Junk (measured)
Length Size Cemented
30" Driven
2458' 13 3/8" 2362 c.f. Permafrost
8391' 9 5/8" 425 c.f. Class 'G'
4824' 7" squeeze summary filed
2755' 4 1/2" 392 c.f. Class 'G'
measu red 12800'- 12820'; 12930'- 12950'; 13458'- 13478' (all open)
Measured depth
BKB
Surface
2496'
8429'
7758'- 12582'
11318'-14073'
True vertical depth
BKB
Surface
2495"
8048'
7526'- 10084'
9560'- 103565
true vertical 10140-10145'; 10170'-10174'; 10255'-10258' (TVD) (all open)
Tubing (size, grade, and measured depth) 4 1/2" 12.6#, L-80 IBM Tubing set at 9738'
Packers and SSSV (type and measured depth) 7" Baker SB-3 Packer (3.875" I.D.) set at 9683'
ORI®iNAL
13. Stimulation or cement squeeze summary Additional Perfs (3/8/98)
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1607 2603 1369 0
n/a
Tubing Pressure
3O2
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations ×
16. Status of well classification as:
Oil x Gas Suspended
Service
17. I hereby certify tha~he foregoing is tr/ue
Signe~~./¢~~
Form 10-~¢/4 Rev 06/15/88
and correct to the best of my knowledge.
Title ~r_ T~hni~l ~t_~_~i_~f:anf IV
Date 3/10/98
SUBMIT IN DUPLICATE~'
BPX
Endicott
Production Engineering
Department
WSA - Well Operations Telex
To:
From:
Well:
Operation:
Date:
Cost Code:
Detail Code:
Endicott Production Engineering
Bundy I Wendt
End 1-47A I M-20
CT Add Perfs
03~08~98
AFE No. 727015 SDTRK/TCP/etc.
9335-070-735
Operations Summary
March 08, 1998
MIRU DS CTU #2. PU PDS GR/CCI and RIH. Run correlation log for perforating frOm 12900' to 12600'. Flag pipe at
12800'. POH. Pick up 2-7/8" TCP gun. RIH. Correct to flag and position guns to fire 12800' to 12820'. Fired guns.
POH. All shots fired. Rig down DS #2.
Perforation Summary
REF LOG: Sperry Sun MWD Dated 119198. Tied in with PDS GR/CCL.
Notes: 4.87' TS to Top of Schlumberger Guns.
Gun Top Int. Btm Int. Size/Type SPF Orientation Phasing
I 12800 12820 2-7/8" HSD 34J UJ RDX 6 Random 60 deg
15.2 gr, 0.29 EHD,
20.57" penetration
J Time Operation
3~08
0330 MI DS CTU #2 w/14,385 ft. 1.75" CT (C I Vol. = 33.1 bbls).
0400 Held Pre-Job Safety Meeting, and Endicott orientation for DS crew.
0530 Raise mast. Nipple up BOP's.
0730 Pull test to 20 k lbs and PT BHA to 4000 ps~
0830 PU PDS Tools
0845 Safety Meeting, Open Swab and RIH
Initial Well Status FWHP lAP OAP FLP FLT GLP
(psig) (psig) (psig) (psig) (deg F) (psig)
Flowing 260 1000 0 250 150 1000
End 1-47/M20 Add Perfs
Page 2
Time Depth Rate CTP WHP Stg Remarks
BPM vol.
3-8-98
0915 100 150 233 RIH, PDS counter not working. C/O counter.
1030 5100 0 260 Wt chk = 11 k lbs
1103 8300 0 260 Wt chk = 15.5 k lbs
1136 11200 0 265 Wt chk = 21.5 k lbs
1139 11311 rag top of liner, Pick up, slip in.
1200 12900 0 260 No tag. Stop and log up for tie in log at 40 fpm, pick up wt = 25 k lbs
1205 12800 Paint flag at 12800' (This is 12789.16' btm of disconnect). Log to
12600', POH.
1410 surf 0 260 OOH. Close swab, bleed down and lay down PDS string.
1430 Safety Meeting with Schlumberger
1445 ... Pick up gun
1500 4 PT lubricator to 2500 psi. Bleed down and open swab.
meoh
1615 5500 0 260 Wt chk = 10.5 k lbs
1715 11370 Tag liner top (uncorrected). Wt chk = 15 k lbs. Make three attempts
and slip in liner.
1735 12880 0 260 Drop 5/8" ball and pull to flag. Correct depth at flag to 12807.9' (top
shot). Pull into position. Top shot @12800'
1745 12800 1.75 2300 270 29 Shots fired, POH
meoh
2000 surf 0 At surface, break down gun ... all shots fired.
Time Operation
2015 Shut well in. RD DS #2.
2130 Put well back on production. Secure location. Contact oil board.
Final Well Status FWHP lAP OAP FLP FLT GLP
(psig) (psig) (psig) (psig) (deg F) (psig)
Flowing 270 1000 0 250 150 1000
Fluids Pumped
I' BBLS. Description
33 MeOH
Diesel
2% KCI water
33 Total Fluids Pumped
End 1-47/M20 Add Perfs
Page 3
BHA Summary
BHA #1: PDS Mem Log-GR/CCL
Tool String Descriptions O,D, I,D, Length Comments
Baker CT connector 2.125 1.0 1.41
Baker Dual check valves 2.125 0.8125 1.30
Baker Hyd disconnect 2.125 0.72 1.53 0.75" ball
XO sub 1.1/2" MT Box X 1" MT pin 2.125 1.02 0.51
XO sub 1" MT pin X ~" sucker rod 2.125 0.625 0.67 Blank Ported Sub
5.42 Baker Total
PDS
Coiled TBG connection 1.875 1.83
Battery Holder 1.6875 1.54
Memory Section 1.6875 2.04
Gamma Ray 1.6875 2.21
CCL Tool 1.6875 1.54
Bull Plug. 1.6875 .0.50
9.66 PDS Total
NOTE: 10.43 ft. from CCL
sensor on PDS tool to btm of
hydraulic disconnect.
Total 15,08' Total Tool string
BHA #2: SWS 20' Per[ Gun Assmbly
Tool String Descriptions O,D, I,D, Length Comments
Baker CT connector 2.125 1.0 1.41
Baker Dual check valves 2.125 0.8125 1.30
Baker Hyd disconnect 2.125 0.72 1.53 0.750" ball
'CBF' Firing Head / XO 6 pitch Acme 2.125 - 4.20 0.625" ball
2 7/8" HSD Deep Penetrating 2.816 - 21.20 Top Shot to Bottom of
Baker Disconnect = 4.87'
Total 29.64'
r'l Ft I I_/I [M G SEFtwIr'Es
WELL LOG TRANSMITTAL
To:
RE:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lori Taylor
3001 Porcupine Drive.
Anchorage, Alaska 99501 ~
MWD Formation Evaluation Logs - 147A/M-20, PB1 & PB2
February 25, 1997
AK-MM-80017
The tectmical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Jim Galvin. Sperry-Sun Drilling Services. 5631 Silverado Way,//G, Anchorage, AK 99518
3 LDWG tbrmatted Discs with verification listing.
APl//' 50-029-21625-01, 50-029-21625-70 & 50-029-21625-71
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
Transmittal
State,.,,-Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
of Final Prints. Please sign and return copy to'
Western Altas Logging Services
Pouch 3400'13
Prudhoe Bay, AK 99734-0013
20-Jan-98
Well Name Services Bluelines R/F Sepia Film
SBT/GR/CCL 1 1 0
1-47A/M-20
Received by: ~
,.Date
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO' David Johnston, DATE:
Chairman ~
January 10, 1998
THRU' BlairWondzell, ..~20.~ FILE NO:
P. I. Supervisor
FROM' John Spauldin~. SUBJECT:
Petroleum Insp. v
akhlajfe.doc
Confidential: Yes , No X
BOPE Test
Doyon 15
BPX / DIU 1-47A/M-20
PTD 97-2O3
Saturday Jan. 10, 1998: I traveled this date to BPX's Duck Island Unit to
witness the BOPE Test on Doyon Rig 15. The AOGCC BOPE Test report form is
attached for reference.
The test went quite well with no failures observed. The crew worked very well
with one another.
Summary: I witnessed the successful BOPE Test on Doyon rig 15, 27 valves, 0
failures, 3.5 hours test time.
Attachments: akhlajfe.xls
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover:
Drlg Contractor: Do¥on
Operator: BPX
Well Name: '/-47AJM-20
Casing Size: 4 '//2 Set @
Test: Initial Weekly
Rig No. '/5 PTD#
Rep.:
Rig Rep.:
'/4,073 Location: Sec.
X Other
DATE: '//'/0/97
97-203 Rig Ph.# 659-65'/0
E. Vaughn
John Welsh
36 T. '/2N R. '/6E Meridian Urniat
Test
MISC. INSPECTIONS: P/F
Location Gen.: ok Well Sign ok p
Housekeeping: ok (Gen) Drl. Rig ok
FLOOR SAFETY VALVES:
Upper Kelly /IBOP
Lower Kelly / IBOP
PTD On Location ok Hazard Sec. ok ' Ball Type
Standing Order Posted ok · Inside BOP
Quan. Pressure
'/ I 500/5,000
500/5,000
500/5,000
P
P
500/5,000 P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Test Press.
300/3,000
500/5,000
500/5,000
500/5,000
500/5,000
500/5,000
500/5,000
P/F
P CHOKE MANIFOLD:
P No. Valves
P No. Flanges
P Manual Chokes
P Hydraulic Chokes
P
Test
Pressure P/F
'/3 500/5,000 P
36 500/5,000 P
2
Functioned
Functioned
P
P
P ACCUMULATOR SYSTEM:
System Pressure 3,000 P
Pressure After Closure '/,450 P
MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 4'/
Trip Tank ok ok System Pressure Attained 3 minutes 28
Pit Level Indicators ok ok Blind Switch Covers: Master: ok Remote:
Flow Indicator ok ok Nitgn. Btl's: 4 @ 2600 avg.
Meth Gas Detector ok o__.Lk. Psig.
H2S Gas Detector ok ok
sec.
sec.
ok
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 27 Repair or Replacement of Failed
Equipment will be made within 0 days. otify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
j
Excellent Test. The crew worked well with each other.
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c- Trip Rpt File
c -Inspector
FI-021 L (Rev. 12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
Akhlajfe.xls
Transmittal
State of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
of Final Prints. Please sign and return copy to:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
30-Dec-97
Well Name
~/- ~o-~ 1-47A/M-20
Services
Bluelines R/F Sepia Film
SBT/GR/CCL
0~!
1-47A/M-20 SBT/GR/CCL 1 1 0 :~
1-47A/M-20 PFC/GR/CCL PERF 1 1 0 1
1-47A/M-20 PFC/GR/CCL PERF 1 1 0 1
Re-ceiv~
JAN 0
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11675
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Endicott (Cased Hole)
12/29/97
qT- 0~'7
Well Job # Log Description Date BL RF Sepia LIS Tape
1-47A/M-20 SET EZSV RECORD 9711 18 I 1
1 - 47 A I M- 20 BACKOFF REPORT 9 712 0 9 I 1
3-09A/L-28 PRODUCTION PROFILE 971218 I 1
3- 27! M- 33 LEAK DETECTION LOG 9 71 2 08 I 1
3-39AII-37 i PERFORATING RECORD/GR 971 106 I 1
3-39AII-37 PERFORATION RECORD 971 217 1 1
3-49AIM-40 PERFORATING RECORD 971 106 1 1
4-421P-38 PRODUCTION PROFILE 971 107 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
REGt::.Iv t::u
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
12/24/97 14'24 FAX 907 564 5193
BP EXPLORATION
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION coMMissION
APPLICATION FOR SUNDRY APPROVAL
i, Type of Request: [] Abandon [] Suspend ~.~ Plugging i--]Time Extension
[~ Alter Casing [] Repair Well L.I Pull Tubing J~ Variance
.~ Change Approved Program [_~ Operation Shutdown [] Re-Enter Suspended Well ~ Stimulate
[] Perforate
[] Other
Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P,O. Box 196012, Anchorage, Alaska 99519-6612
'4.
5. Type of well: J~ Development
I~ Exploratory
~ Stratigraphlc
~] Service
Location of well at surface
2146' SNL, 2169' WEL, SEC. 36, T12N, R16E, UPM
At top of productive interval N/A
At effective depth
N/A
At total depth
N/A
Datum Elevation (DF or KB)
Plan KBE = 56'
7, Unit or Property Name
Duck Island Unit/Endicott
8. Well Number
1-47A/M-20
g. Permit Number
97-203
10. APl Number
50-029-21625-01
1. Field and Pool
Endicott Field / Endicott Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Plugs (measured)
13085 feet
10198 feet
12579 feet Junk (measured)
10084 feet
Length Size Cemented ~3'/ MD
68' 30" Driven ,~/-- -- t0K~
2457' 18-3/8" 2362 c.f. Permafrost A %,'~ 2496'
10227' 9-5/8" 425 c,f, Class'"'G' r.,, ~,,~,"'"~ 10266'
measured ,'ii;-.~R PERVIOUS SENT FAXES (12118/97 & 12/
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
TVD
I~KB
107'
2492'
9529'
RECEIVED
Anch0rag8
13. Attachments [~ Description summary of proposal [] Detailed operations program ~ BOP sketch
14. Estimated date for commencing operation
December 22, 1997
16. If proposal was verbally approved
Blair Wondzell
Name of ap_prover
Comact Engineer Narne/Numl3e~ Bill Lloyd, 5~4.4016
15. Status of well classifications as:
d ~ I J~ Oil [] Gas [] Suspended
12/22/97I Service
..Date appr. gved.
Prepared By NamelNum~er;
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Commission Use Only
J Approval NoL_~<).7 .. Z.~J
Conditions of Approval: Notify Commission so representative may~.witness
Plug integrity ~ BOP Test~,'"' Location clearance
Mechanical Integrity Test ~ Subsequent form required 10-
0i'iglna! !~!gnea Uy
~pproved by order of the Commission David W_, JohEiston Commissioner Date
Fo~ 10-403 Rev. 06/15/88 Submit In Triplicate
December 22, 1997
Blair Wonzell
AOOCC
3001 Porcupine Drive
Anchorage, Alaska 99501
Endicott 1-47a/M-20
Doyon Rig 15
Remedial Cementing ~ 7" Intermediate
Dear Mr. Wonzelh
On December 18, I notified you via fax letter, of the conditions of operation surrounding the
setting of our 7" intermediate casing string. This letter is to inform you of the operations
conducted through this date along with our proposed future operations to provide additional
cemented zonal isolation. Rather than detail the circumstances leadJ.~g up to the current
operations, I ask that you please review the previous letter dated 12/18.
Since that time, the following surm~aarizes operations:
As per the information provided in thc previous correspondence, we successfully conducted
items 1-3 of that letter, Since we were able to obtain a casing pressm'e test of 3500 psi for 30
minutes, it became apparent that we would be unable to circulate cement as proposed, We set a
cement retainer at 12574' and~l~umped 50 sacks of cement through the retainer and float
equipment at 2 bpm and~'_~ifl We then proceeded to perforate from 12534'- 12530' and
from 12114' - 12110' with 6, 0.75" jspf, A cement retainer was then set at 12378' and
circulation established between the two sets of perforations. We then pumped 20 bbls of spacer
and 90 sacks of cement at 6 bpm and 2200 psi.
After completing th~s portion of the remedial cementing process~ we drilled out both retainers
and cement, leaving the float shoe intact. At 12110' (upper perfs) and at the first retainer at
12378', we did not encounter any cement.
This morning we attempted to run a cement bond log across the cemented interval of 12530' -
12114', We ran the CBL on wireline utilizing a "tractor" tool but got hung up at the top of the 7"
liner at 7774'. We are currently fishing for the CBL tool.
Our forward plans, per our discussion this morning, is to complete our fishing operations and our
bond log run to evaluate the cement quality. Any additional remedial cementing across -the
perforated intervals for zonal isolation per our Asset group will be completed. In. addition, and
because of the set liner top packer at 7774' (which prevents us from ckculating), we are
requesting a variance f_rom Section 20.d.3.C A_AC "Casing and Cementing - Intermediate
Casing" which requires 500' of amaular fill-up to a minimum of 500' above all significant
hydrocarbon zones and abnormal pressure intmwals. Rather, we request that we be allowed to
perforate at the top of the Kekikmk (pay zone) and squeeze cement to provide the appropriate
zonal isolation. We make this request in recognition of the following:
1) Inability to circulate between the open hole/7" liner annulus under present conditions because
the liner top packer [s set and tested.
2) 2 verified zones of isolation BELOW the proposed perforations. This verification is made by
virtue of our current bond logging operations.
3) Potential inability to circulate along with the inherent risk associated wit_~h a "suici~~
between perforations located 500' apart. In order to obtain 500' of cement above the
Kekiktuk, this would be the only available option.
4) Costs associated with additional perforating runs, cement retainers, etc. In addition, it is our
intent to bring the planned 4-1/2" production liner lap 150' above tl~e top of the la.st remedial
perforation.
In order to accomplish the requested squeeze of the top of the Kekiktuk, we would test the
existing perforations at 12110' ~-~.1~.1_14'. If competent, we would perforate at approximately
11400', spot a balance~t plug across the perforations and squeeze cement. In the event the
'~-~rf°ration at 12110' - 12114' do not hold, we would set a CIBP below the perforations at
11400' and squeeze. Based upon our conversation this morning, permission is hereby requested
to proceed as planned. In addition, a form 403 will be submitted for this operation.
If you have any questions, comments or concerns, please contact me as soon. as possible.
Sincerely,
William B. Lloyd
Shared Services Inc.
12/18/97
Blair Wonzell
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
RE: Endicott 1-47a/M-20
Doyon 15
Dear Mr. Wonzell:
As we discussed last night, while running our 7" liner on the referenced well to a planned TD of
13,085', we encountered tight hole and packed off conditions at a depth of 12,574'. At that point
we could neither move the pipe up or down, nor could we circulate. We were able to release
from the liner and retrieve the liner running tool. The current op of the liner is at 7794' which is
630' inside our 9-5/8" casing (window at 8424' - 8474').
Our forward plans for the 1-47a at this point are as follows:
1) Drill out 7" float equipment.
2) Set 7" CIBP at +/. 12,574'
3) Set RTTS packer at top of liner and pressure test casing.
4) Perforate @ 12554', TIH w/cement retainer to 12530' and attempt to lift cement to 8800' in
the 7" - OH/95/s'' annulus. If unable to lift cement, will squeeze perfs to isolate the 2A below
and move to step 5. If cement does lift, we will proceed to step 6.
5) Perforate 12210', TIH w/cement retainer to 12190' and attempt to lift cement to 8800'. If
unable to lift cement we will squeeze perfs to isolate 2B from 3A.
6) Perforate at 11,000', TIH w/cement retainer to 10990' and lift cement to 8800'
7) WOC then pick out 6" bit and drill out cement, cement retainers and CIBP. Drill 6" well
bore to 14,0 ! 8' per well plan.
If you have any questions or concerns regarding this proposed plan, please contact me at 564-
4016.
Shared Services I~rilling
1998
TONY KNOWLE$, GOVERNOR
~kLASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
November 6. 1997
Steven Shultz
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
POBox 196612
Anchorage, AK 99519-6612
Re:
Duck Island Unit 1-47A/M-20
BP Exploration (Alaska) Inc.
Permit No. 97-203
Sur. Loc. 2146'SNL. 2169'WEL. Sec 36, T12N. R16E. UM
Btmnhole Loc. 3479'NSL. 2973'WEL. Sec. 31. T12N. R17E, UM
Dear Mr. Shuitz:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to alloxv a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
avid
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging '~]Time Extension [] Perforate
~ Alter Casing [] Repair Well ~ Pull Tubing ~ Variance [] Other
i~ Change Approved Program [] Operation Shutdown ~] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
Type of well:
~ Development
..~ Exploratory
[-~ Stratigraphic
~I., Service
4. Location of well at surface
2146' SNL, 2169' WEL, SEC. 36, T12N, R16E, UPM
At top of productive interval
4854' SNL, 1677' WEL, SEC. 36, T12N, R16E, UPM
At effective depth
5095' SNL, 1548' WEL, SEC. 36, T12N, R16E, UPM
At total depth
5134' SNL, 1542' WEL, SEC. 36, T12N, R16E, UPM
6. Datum Elevation (DF or KB)
KBE = 55.10'
7. Unit or Property Name
Duck Island Unit/Endicott
8. Well Number
1-47/Q-21
9. Permit Number
86-131
10. APl Number
50-029-21625
1. Field and Pool
Endicott Field / Endicott Pool
12. Present well condition summary
Total depth: measured 11400 feet
true vertical 10535 BKB feet
Effective depth: measured 11312 feet
true vertical 10456 BKB feet
Casing Length Size
Structural
Conductor 68' 30"
Surface 2457' 13-3/8"
Intermediate 10227' 9-5/8"
Production
Liner 1413' 7"
Plugs (measured)
Junk (measured)
Cemented *;~:* .... -' ~,-_ ...... '~ ';. MD
BKB
Driven 107'
2362 c.f. Permafrost 2496'
425 c.f. Class 'G' 10266'
546 c.f. Class 'G'
9987'-11400'
']-VD
BKB
107'
2492'
9529'
9291'-10535'
Perforation depth:
measured
true vertical
10860'-10872',10914'-10922',10950'-10970',10976'-10988',11072'-11080'
', ,0,10185'-10193'
(Subsea)9996'-10006',10044'-10051 10076'-10094',10099'-10!~ '
Tubing (size, grade, and measured depth) 4-1/2" 12.6#/ft L-80 BTRS Non-IPC with 3-1/2" tailpipe to 10047'
Packers and SSSV (type and measured depth) 4-1/2" SSSV at1597'; e-5/8" Packer at 9938' 0P, It31NAL
13. Attachments [~ Description summary of proposal [-J Detailed operations program [--I BOP sketch
14. Estimated date for commencing operation
October 30, 1997
16. If proposal was verbally approved
Name of approver
Contact Engineer Name/Number: Chds West, 564-5089
Date approved
15. Status of well classifications as:
[~ Oil ~ Gas E~ Suspended
Service
Prepared By Name/Number: Kathy Campoamor, 564-5122
Signed
Steve Shultz ---¢ ~LL~J~- O~-u~k/k~.~ Title Senior Drilling Engineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Date
I Approva,
Plug integrity_
Mechanical Integrity Test
Approved by order of the Commission
BOP Test
Location clearance
Subsequent form required 10-
Commissioner
Date
Form 10-403 Rev. 06/15/88 Submit In Triplicate
STATE OF ALASKA
ALASK~.~ ~-iL AND GAS CONSERVATION CO;~i~VllSSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [-I Exploratory I--I Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone I--I Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 56' Endicott Field / Endicott Pool
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 312828
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2146' SNL, 2169' WEL, SEC. 36, T12N, R16E, UPM Duck Island
At top of productive interval 8. Well Number Number 2S100302630-277
2968' NSL, 247' WEL, SEC. 36, T12N, R16E, UPM 1-47A/M-20
At total depth 9. Approximate spud date Amount $200,000.00
3479' NSL, 2973' WEL, SEC. 31, T12N, R17E, UPM 11/10/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 034633, 2307'I 1-27/P-20, 98' at 10688' MD 4299.74 14018' MD / 10295' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 8500' MD Maximum Hole Angle 39° Maximum surface 3935 psig, At total depth (TVD) 9645' / 4900 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 29# L-80 511 4780' 8350' 7988' 13130' 10201' 150 sx Class 'G'
6" 4-1/2" 12.6# L-80 511 1038' 12980' 10175' 14018' 10295' 100 sxClass 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations. '~.'~:: ~"L .-¢ ~- ~
Present well condition summary ,~, f""~ :-~, ._?
Total depth: measured 11400 feet Plugs (measured) ~,..., ,-,, ~: ;'? '~'
true vertical 10535 BKB feet ~ ~.,o,...,?,~,~$
Effective depth: measured 11312 feet Junk (measured) , ~¢,~;~:.*-,.' _ .... ..,...~.~_,., ,. ~;,,:,...,..-,
true vertical 10456 BKB feet ?~.v ...... ?i~¢,0,
Casing Length Size Cemented MD TVD
Structural BKB BKB
Conductor 68' 30" Driven 107' 107'
Surface 2457' 13-3/8" 2362 c.f. Permafrost 2496' 2492'
Intermediate 10227' 9-5/8" 425 c.f. Class 'G' 10266' 9529'
Production
Liner 1413' 7" 546 c.f. Class 'G' 9987'-11400' 9291 '-10535'
Perforation depth: measured 10860'-10872', 10914'-10922', 10950'-10970', 10976'-10988', 11072'-11080'
true vertical (Subsea) 9996'-10006', 10044'-10051 ', 10076'-10094', 10099'-10110', 10185'-10193'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Chris West, 564-5089 Prepared By Name/Number: Kathy Campoamor, 564-5122
21. I hereby certify that the,,fo,~egoin.q_is tru~ and correct to the best of my knowledge
Signed ~ ,'~! ~
Steve Shultz ~. Title Senior Drilling Engineer Date
' ~ Commission Use Only
....
Permi~-Cz_z¢,~~ 50- O ~.<~ - ::2._.//~ ~-,.~'-~=:~/) t ~. c~ ~ for other requirements
Conditions of Approval: Samples Required []Yes ~___,No Mud Log Required -- ' []Yes ~ No
Hydrogen Sulfide Measures ~.~Yes E_INo Directional Survey Required J~Yes [-INo
Required Working Pressure fo~ BOPE I--12M; •3M; J~5M; •10M; ~15M
Other:
0l'i~' R a I ~ J~ Fled J 0 h i-i s to i1 By the by order of commission Date
Approved By David W. Commissioner /'i ....
Form 10-401 Rev. 12-01-85
Submif
l Well Name: 1-47a/M-20
Well Plan Summary
IType of Well (Producer or injector): Producer
Well Design (Conventional, slimhole, etc.)' SIDETRACK
FSL FEL SEC TWP RNG
Surface Location: 3133 2168 36 12N 16E
Tie in survey Location: 1972 1645 36 12N 16E
Target 1 Location: 2968 247 36 12N 16E
Bottom Hole Location: 3479 2973 31 12N 17E
I AFENumber: 1727015 I I
Estimated Start Date' lO/Nov/97
I Rig' I DOYON 15
Operating days to drill and
complete:
22+5
Formation Markers Well Bore:
Formation Tops MD TVDSS EMW RESERVOIR PRESSURE
KBE -56 Max surface pressure =4055 psi
TOP WEST SAK
TOP SEABEE/AYLYAK 7725
TOP SHALE WALL/TUFFS 9584 8850 KOP 8,500 MD / 8,105 TVDSS
TOP HRZ 10898 9370
BASE HRZ 11454 9590
TOP PUT RIVER
LCU
ITKILYAFIIAK
KEKIKTUK - Top Flow 3B 11454 9590 9.83 4900 psi @ 9590 TVDSS
Top Flow 3A 11593 9645 9.77 4900 psi @ 9645 TVDSS
Top FIow2B 12048 9825
Top FIow2A4 12302 9925
Top FIow2A3 12354 9945
Top Zone K1/1C 12844 10095
Top Zone K1B 13129 10145
Top ZoneK1A 13959 10285
TD 14018 10295
Logging Program:
8.5" Hole Curve and Tangent MWD-GR - to ICP
ILogs:
6" Hole Curve and Tangent
Cased Hole:
MWD-GR - Den - Neu - Res from ICP to TD
None
Casino. fTubinc. Proc. ram'
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D, MDfl-VD MD/TVD
8,5 7" 29 L-80 511 4780 8350/7988 13130/10201
6 4,5" 12.6 L-80 511 1038 12980/10175 14018/10295
TBG 4,5" 12.6 L-80 IBM 9462 38 9500/8867
1-47a/M-20 Drilling Permit
Directional Plan #2
1 O/22/97
Cementing Program:
Hole Section Liner Size Depth Volume Cement
Intermediate 7" Liner from 8350 Cement from +_ 150 Sxs Class 'G'
to 13,130 with 7" x 12,130 to 0.5% CFR 2
9-5/8" liner hanger 13,130 0.7% Halad 344
0.1% HR-5
2 pps Super CBL
Production 4.5" Liner from Cement from _+ 100 Sxs Class 'G'
12,980 to 14,018 12,980 to 0.5% CFR 2
with 4.5" x 7" liner14,018 0.7% Halad 344
hanger 0.1% HR-5
2 pps Super CBL
Mud Program:
Production Mud Properties: 18.5" and 6" hole section: LSND
Depth Density Marsh Yield 10 sec LSR YP pH Fluid Flow
(PPG) Viscosity Point 10 Min Loss Rate
Gel
Milling 10.0- 65-95 25-35 8-16 8.5- <5 600
10.2 11 - 32 9.5
Reservoir 10.2 - 45 - 65 16 - 24 4 - 10 7 - 11 8.5 - <4 250
10.4 9.5
Hazards/Concerns Pore pressure (_+8.6 - 9.4 ppg EMW) based on offset SIBHP.
Lost Circulation due to overbalance in Flow sands.
Differential sticking with overbalance situation.
Excessive Torque to be combated with lubricant additions after
testing.
Maintain minimum YP of 25 #/100 sq ft
WELLHEAD EQUIPMENT
Casing Head:
Casing Hanger:
Tubin~lhead:
X-mas Tree:
McEvoy 13 3/8" X 13 5/8", 5M Flange
McEvoy Mandrel Hanger
McEvoy 13 5/8",5M X 13 5/8", 5M
Cameron 6",5M
DIRECTIONAL STATS FOR 9 5~8" CASING ON 1-47/Q-21
Average Angle:
Maximum Angle
Maximum Dogleg
39°
39021" @ 8700'
2.85°/100@5900'
2.75°/100'@6600'
Centralizers
Top of Cement
21 Turbo Clamps from 8200 to 10660
8586 (Calc. assumin~l 30% washout)
Drilling Hazards
DRILLING CLOSE APPROACH WELL SHUT-INS
After the sidetrack of the original 1-47/Q-21 well-bore, there is one well which is a close approach. The closet is
well 1-27/P-20 which is within tolerance for flowing conditions from 10,600' to 10,800'. This well will meet the
deep intersection risk assessment. Close attention to the tolerance lines are necessary to avoid this well. See the
TC plot for details.
PORE PRESSURE / LOST CIRCULATION
Production Interval (8.5"): The Kekiktuk Sands reservoir pressure may be slightly higher than normal AND
VARIES GREATLY, but the Asset pore pressure (based on nearby gas injection BHP of 4900 psi at 9590 TVDss)
should range from +_ 9.7 to 9.8 ppg EMW. The formation also has the potential for lost circulation (see Geologic
Prognosis for faulting details). Lubricant additions (see above) should be utilized if torque and drag become
1-47a/M-20 Drilling Permit
Directional Plan #2
1 O/22/97
troublesome, and after extensive testing of mud on location. Flex collars should be utilized in the BHA to minimize
potential differential sticking. Liquid casing and OM seal should be on location to help combat severe lost
circulation.
NOTE:
See the Geologic Prognosis for a detailed description of the expected fault locations and sizes.
Review the Pad Data Sheet for trouble highlights throughout MPI history.
Well Control:
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed
and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Disposal
Cuttings Handling:
Fluid Handling:
CC2A
Annular injection is not available at Endicott for this well.
Contacts
Office Home Pager
Drilling Superintendent Paul Prince 564-5589 345-6867
Sr Drilling Engineer Steve Shultz 564-5405 373-1657
Operations Drilling Engineer: Chris West 564-5089 345-4699
Production Engineer Emerson Milenski 564-5952 243-8797
Reservoir Engineer Susan Brown 564-4375 349-8464
Geologist: Brent Voorhees 564-4448 694-3517
Geophysicist: Steve Roberts 564-5911 348-0358
Sperry Sun Directional Gordon Hecht 563-3256
Sperry Sun MWD/LWD Jim Galvin 563-3256 349-2746
Baroid Dave Higbie 248-3511 345-0398
275-7503
275-1789
275-7530
275-1337
1-47aiM-20 Drilling Permit
Directional Plan #2
10/22/97
Drilling Discussion
General
The 1-47a/M-20 well on MPI at Endicott will target the Kekiktuk in the 3B/3C in accordance
with the 1997 development plan. We will have to abandon the existing perforation in the 1-
47/Q-21 well by pumping cement down tubing, cut production tubing, circulate KWM, pull
tubing with the rig, cut a section, set a cement plug, and kick off through the 9-5/8" casing to
the M-20 BHL utilizing the 7" and 4.5" liner design. We will not pull the existing production
packer or tailpipe in this well. The 7" liner length will be +- 4780 feet, with the top of the liner
hanger back into the 9-5/8" casing. The 4.5" liner length will be __ 1038 feet, with the top of the
liner hanger back into the 7" casing.
A standard 6 valve slimhole (4.5" x 1.5" for 9.625" casing) GLM design will be run for the
completion on a 4.5" L-80 tubing design with a X/X/XN nipple profile.
Directional Plan:
The directional plan for the 1-47a/M-20 well consists of kicking off with a section mill and
conventional BHA's for the Kekiktuk Flow sands. Current plans call for 8°/100' doglegs in this
section, but this may be adjusted pending results during the drilling process. After
sidetracking, drilling the tangent at 67° degrees, and steering directionally back into the Sands
with 80° of inclination, the well will be drilled to +_14,018 MD (10,351' TVD). THE
DIRECTIONAL TARGET CAN BE INTERSECTED ANYVVHERE WITHIN THE TARGET
BOUNDRY. THUS UNNECESSARY AND VERY EXPENSIVE SLIDING SHOULD BE
AVOIDED TO KEEP THE WELL EXACTLY ON THE WELLPATH. THERE IS NOT ANY
GEOSTEERING APPLICATION FOR THIS WELL.
Ensure that any and all tolerance lines are not crossed to avoid policy violations. Please
coordinate this through both the Operations Drilling Engineer and the Endicott Drilling
Superintendent. There are not any known close approaches which require wells be shut in.
Any BHA's indicating less than required BUR should immediately be pulled for a more
aggressive assembly.
Recommended BHA's
All motors should NOT be jetted to account for the proposed flowrate and motor performance.
Hole conditions and directional objectives should dictate actual flowrates. As mentioned
previously, flex collars should be utilized in the 8.5" hole sections to minimize potential
differential sticking. We will be using bent housing motors with either 7/8 for a roller cone or
5/6 rotor/stator configurations for PDC bits IF run.
Sperry proposed BHA's are attached, however the actual BHA with motor design, MWD/LWD
tool configuration, MWD battery life, bit hydraulics will be discussed at the daily wellsite
meeting.
Directional Survey Program
The survey program for 1-47a/M-20 calls for use of Sperry's DWD MWD surveys the entire
well. Because of Sperry's standard practice of changing the MWD probes after every bit run,
an electronic single shot (ESS) will not be needed, and a gyro is not warranted. Close
attention to JORPS is required, with the use of checkshots and survey data validation.
Bit Program
We will kick off the in the Tuffs with a conventional directional BHA and roller cone bit, which
should make it to the Kekiktuk. After milling the window, a 8.5" tangent section is planned to
the Kekiktuk. The penetration rate will vary due to the variable lithology, but these bits have
proven durable enough to drill through most of this interval. However, if there is any indication
of bit failure such as torque spikes, the bit should be pulled at the descretion of the rigsite
team.
1-47a/M-20 Drilling Permit 10/22/97
Directional Plan #2
Recommended Jet Sizes
Expected Interval Bit Type Flowrate HSI
Casing Section Standard Window Mills 500 - 550 gpm
8.5" Kickoff - only GTPS09 550 - 600 gpm 3 x 12 2.9 - 4.8
8.5" Tangent PDC Bit 550 - 600 gpm 3 x 15 2.9 - 4.8
8.5" Final Build ATJTPS20 550 - 600 gpm
6" Reservoir Section Hycalog DS111 250 - 300 gpm
NOTE: Real time rigsite information such as condition of bits previously pulled, hole
conditions, drilling fluids, downhole motor constraints (if any) will be instrumental in actual final
bit selection. PDC bits will be run in the 8.5" hole section only if Sperry 6-3/4" performance
motors are available.
Mud Program:
We will use LSND on this well to both mill the window and drill to TD. There should not be any
additions of any lubricants in this well without extensive testing of the actual fluid on location. A
new Gel/Biozan polymer will be used for milling the window. Ditch Magnets should be used
and WEIGHED to ensure metal cuttings removal.
Rheology control can be maintained using Gel and Biozan polymer. At this time raise the LSR
YP to the recommended range using Biozan. Biozan sweeps should be pumped to assist in
hole cleaning and to prevent the build up of cuttings beds. Mud sweeps are essential for good
hole cleaning while drilling.
Additions of 3#/BBL each of Baranex and Barotrol should be maintained throughout this well. This
treatment should result in an HPHT of <14 which is our target. Maintain the pH in the 9-9.5 range
using caustic soda. If torque problems arise, a treatment of 1- 2% Lubetex should be used. If the
torque persists, the ERD lubricant mix should be evaluated.
The LSND mud will be taken to TD on this well. Maintain the weight at the density required in the
intermediate section. The Barotrol and Baranex treatments should be maintained at 3#/bbl untill the
ICP.
The APl filtrate should be reduced to the 4 cc range with PAC and starch. This will reduce the
chances of differential sticking and reduce filtration invasion.
Tripping Practices / Stuck Pipe / Hole Cleaning
Tripping in the 8.5" hole interval should be undertaken with caution due to swabbing
possibilities with high viscosity fluids. The bottom hole pressure is approximately 4950 psi (8.6
to 9.5 ppg ). It is recommended that mud weights be maintained in the 10.2 to 10.4 ppg range
to control the hydrocarbon intervals, maintain shale stability and minimize the possibility of
differential sticking. Faulted intervals may require additions of LCM prior to tripping to insure
that the hole remains full at all times. Keep the pipe moving and have an ample supply of lost
circulation materials on hand. Baroid recommends utilization of Iow viscosity sweeps to assist
with hole cleaning and to minimize the formation of cuttings beds on the Iow side of the hole.
No potential hazardous levels of H2S are anticipated in the 1-47a/M-20 well. There have been
H2S reading on offset MPI wells of over 1000 ppm. Ensure rig gas detectors are calibrated
prior to N/D tree and/or circulating to kill the well.
1-47a/M-20 Drilling Permit
Directional Plan #2
10/22/97
SUMMARY Pi OCEDURE
COMMENT_S
).
The 9-5/8 "x 4-1/2" production packer is a Baker permanent packer with a tubing seal assembly above.
The packer will not be recovered.
The existing perforations have been plugged with cement
This well will be sidetracked at app. 8500 feet.
PRE-RIG OPERATIONS
1. RU wireline, Pull the WL SSSV. Drift and dummy off gas lift mandrels.
2, RU and run coil tubing across perforations, and establish circulation.
3. Pump 100 sx of class G cement and circulate down the coil tubing, Displace to place cement across
perforations from 10,860' to 11,080' MD AND at least 100' above top perf. Squeeze cement if possible up
to 1500 psi,
4. RU wireline and cut tubing with chemical cutter above 4.5" x 9-5/8" packer at 9,938' MD.
5. Circulate the 4.5" tubing with 1.5 volumes of sea-water. Check that the well is dead. Freeze protect the
top 200' with diesel. Set BPV,
N01;~: Maintain contact with Drilling. If rig move is delayed to more flhan four days after the well kill, a
deeper freeze protect will need to be done by the PE's.
6. Dig out the cellar and level the pad. Inspect the wellhead and tree, Replace the 9-5/8" packoff and
function test the LDS's,
_RLG_Q _P_ERATIONS (SUMMARY)
I. Mobilize Doyon 15. Review Endicott Simultaneous Operations Plan concerning rig moves.
2, Check that the well is dead, If not circ well w/brine or milling fluid until dead.
3. ND the tree, and NU the BOPE, Test the BOPE and pull BPV. (1/2 day)
4, Screw into the landing joint, Pull and LD the tubing. (1 day)
5, Run and set 9-5/8" wire,ne bridge plug at _ 8600' MD. Displace seawater with milling fluid (1/2 day).
6. P/U 9-5/8" section mill BHA and TIH to cut seotion from 8450 - 8500 MD_ POOH with mills (2 days)
7. Place 300 Sack cement plug across section and squeeze into interval at up to 1000 psi. (1/2 day)
8, Pick up Sperry 6.75" directional BHA to turn and build @ 8°/100 feet to 67° at app 9596' MD. Drill ahead
as specified by the rig supervisor to ICP at 13,129. POOH. (12 days) ~
9, Run a 7" solid liner from 8350 to 13,129 MD, cement as per plan. (2 days).
10, Pick up Sperry 6." bit and directional directional RHA to TD at appx 14,018' MD. POOH. (3 days)
11. If there are hole problems, run a HO over whole interval and spot lubricant in OH section. POOH,
12. Run a 4.5" solid liner from 12,980 to 14,018' MD. And cement as per plan(2 days).
14. Make a clean out trip with bit and scraper and displace with KW Bdne.
15. Perforate with DPC based on intervals picked from the open hole logs.
16_ RIH w/two (S3 and SABL-3) 7" × 4-1/2" packer, 4-1/2" L-80 tubing, and 10 GLM's to expected setting
depth at 13,040' MD. Drift packer, tubing and all jewlery before running. See completion diagram. (1
day)
17. Pump Corrosion inhibitor. Set the 7" packer. Test the tubing to 3500 psi. Test the packer and IA to 3500
psi. (1/2 day)
Set the BPV. ND the BOPE, and NU the tree. Shear the RP valve and freeze protect the well. (1/2 day).
18,
Turn the well over to Production.
1-47/Q-21 Drilling Permit
Directional Plan
11/5/97
SUMMARY PROCEDURE
COMMENTS
.
· --,The packer will not be recovered.
·
2. \~ This well will be sidetracked at app. 8500 feet.
PRE-RIG~'OPERATIONS
.
.
.
.
.
.
10.
11.
14.
15.
16.
17.
The 9-5/8" x 4-1/2" production packer is a Baker permanent packer with a tubing seal assembly above.
1. RU w[reline,~ Pull the WL SSSV. Drift and dummy off gas lift mandrels.
2. Establish ~llhead rate down 4.5" tubing and into perforations.
3. Pump 100 sx ~class G cement and c, irculate/down the tubing. Displace to be, l(~TM WLEG to 10,500' MD
if possible, but to~a~, minimum of 8500 MD. Squeeze cement into perforation, s~ up to 1500 psi.
~' kr~a
4. RU wireline and cut tbb, ing with chemical cutter above 4.5" x 9-5/8" pac t 9,938' MD.
5. Circulate the 4.5" tubing"w,,ith-- 1.5 volumes of seawater. Check that th, e/Well is dead. Freeze protect the top
200' with diesel. Set BPV. '\~
Note: Maintain contact with Drilling. If rig move is delayed to m hah four days after the well kill, a
deeper freeze protect will need th\be done by the PE's.
6. Dig out the cellar and level the pad:,,,Inspect the wellhead arid tree. Replace the 9-5/8" packoff and
function test the LDS's. ~
RIG OPERATIONS (SUMMARY)
1. Mobilize Doyen 15. Review Endicott simultaneous orations Plan concerning rig moves.
2. Check that the well is dead. If not circ well w~' br, lhe or milling fluid until dead.
3. ND the tree, and NU the BOPE. Test the BO/p~and pull BPV. (1/2 day)
/\
Screw into the landing joint. Pull and LD t~ tubing., (1 day)
Run and set 9-5/8" wireline bridge plug/at~ '"_. 8600 ~D. Displace seawater with milling fluid (1/2 day).
P/U 9-5/8" section mill BHA and TI~-i t~o cut section ;rb,,,m,'''' 8450-8500 MD. POOH with mills
(2
days)
/
Place 300 Sack cement plug acrg~s section and squeeze,,into interval at up to 1000 psi. (1/2 day)
Pick up Sperry 6.75 direction~ BHA to turn and build @ 8°/,100 feet to 67° at app 9596 MD. Drill ahead
as specified by the rig supervisor to ICP at 13,129. POOH?(,12 days)
Run a 7 solid liner from 8/:~50 to 13,129 MD, cement as per plan,~,(2 days).
/
Pick up Sperry 6." bit a/n/d directional directional BHA to TD at apP':\14,018' MD. POOH. (3
days)
/
If there are hole probl/e/ms,-- run a HO over whole interval and spot lubr~oa~nt in OH section. POOH.
Run a 4.5" solid lin/er from 12,980 to 14,018' MD. And cement as per plan(~days).
Make a clean ou/t/trip with bit and scraper and displace with KW Brine., "'e~pt~
RIH w/7" x 4-]//2'' packer, 4-1/2" L-80 tubing, and 6 GLM to expected setting d 9500' MD. Drift
packer, tubin,~ and all jewlery before running. (1 day)
Pump Cor/r0sion inhibitor. Set the 7" packer. Test the tubing to 3500 psi. Test the padk,er and IA to 3500
psi. (1/2/day)
/-
Set th,o' BPV. ND the BOPE, and NU the tree. Shear the RP valve and freeze protect the well. (1/2 day).
18. Turn the well over to Production.
1-47/Q-21 Drilling Permit
Directional Plan #2
10/23/97
W'ELL NAM~
1-47/Q-21
RT ELEV = 55.1'
BF ELEV = 15.8'
MAX. DEV. · 39:21
8700' MD
Tog Vol - 151 Bbl&
Tallpipe Vol - 1 Bbl.
Uner t oTop Perf Vol - 30 Bbls.
I~ 3C1
814186 303
302
392
CMPIWELL 1-47/Q-21'
TREE: 4-1116'/ 5000 PSI/ ClW
WELLHEAD: 11' / 5000 PSI/ FMC
DEPTH
MDBRT
4 1 /2" SSSV @ 1597' (MIN. I.D. 3.813')
WITH SSSV MIN I.D. 2.0"
13-3J3" CSG SI-OE 2,496'
4-1 /2', 12.6#/FT, L-80, BTRSTBG
GAS LIFT MANDFELS (H~S)
TVDSS M3-BKB
#6 4165' 4226'
#5 6330' 6416'
#4 7769' 8138'
#3 8683' 9306'
#2 8927' 9610'
9045' 9756'
CA~ SLIDIN3 SLEEVE 9,865'
{3.750' MIN ID)
BAKER'EB-I' TEG SEAL ASSY 9,923'
BA~;ER 9-5/8' PAC~,ER 9,938"
HARI'EP PROJECT t ,i-7 /r-~ O '1 50029-216~'~3C,/
EI,.iE~t,]GTT / -- "1' //L.4-- -/
.j
i "-, l
. .: . .... ;_:..- :: ..
,:PI: 6~_.-~zz ~2.-'27/96 10:'50'i32 'DEPth U~il-T ': FEET COMMENT: NO:':E
ACTuAl ....... ~.._.~__];._..~: MD P£RF$ . ,...: ... : . ;,.;:..._,. ..r_: -...
3-1 /2', 9.2#/FT, TAILRPE
OTIS 3-1/2' 'X' NIPPLE 9,982'
(2.750' ID)
TO~ 7' LINER 9,987'
OTIS 3-1/2' 'XN' NIPPLE 10,014'
(2.635" ID)
WIFE LINE BqTRY GUIDE 10,047'
9-5/8', 47#1FT CSG SHCE 1 0,266'
PEFFO:{ATICNS:
10,860' TO 1 0,872' (Squeezed)
10,914' TO 1 0,922' (Squeezed)
10,950' TO 10,970' (Squeezed)
10,976' TO 1 0,988' (Squeezed)
BAKER DPC 5" @ 4 SPF
REF: DLL-GR (8/04/86)
11072'. 11080' O 4 SPF 2 1/8' GUNS (Squeezed)
~ 11,312'
7' - 29#/FT CSGSHOE 11,400'
BP EXPLORATION, INC.
ENDICOTT WELL 1-47 / O-21
APl I~: 50-029-21625
FEVI,..q~ BY: _ JLLJ__ DATE _ 3/..t~..,9.J____
TOP M.D. BOT M.D. H TOP TVD BOTTVD
10860 10872 12 9996 10007
10914 10922 6 10044 10051
10950 10970 20 10078 10094
10978 10988 12 10100 10110
11072 110B0 8 10185 10193
1012190 1013190 10112/92 3118194
0.34 0.27 0.28
o.oo o.oo o.oo
o 41 0.43 0 64 -~"~__=~-~,-i~
:).125 0.15 0 08
3 I~_5 0.15 0 00
Last Revised: 03/18/94
TREE: 4-1/16" -000 psi, CIW
RT. ELEV = I 55.1'I
Maximum Dev. = 80 deg. J.--.---- sssv LANDING NIPPLE I 1600'
IO
/ i (RR1R MIN
' I ]----'--~ ~"~'~I~13'3/8'' Surf csg I 2496' '
· ,-, S' 2,0, Wellbore
KOP = 8,500'md / 8,105 tvd.
.,~.~ 4-1/2" L-80 Tbg
Mandrels, All RK Latches
NO. MD-BKB I, TVD-SS
~ ............. -~.-- ~6 3560350[)
~5 5563525p: -]-
-- ~ , ~: .............. ~f4 66016303,
!
-~--- 9-5/8' Csg I l~3 75437003
I
I ~2 83077703'
' ~1 89208403' !
~ ~ k #6-#2 depths ref'd to 1-47/Q-21
i directional survey. #1 from M-20
-~-- 7" Liner ~ proposed directional plan.
Exact location of iewelry to beI
determined from open-hole logs.
I I '~ 4-1/2" 'X' ~,~I9,220'
Mandrels,
packer,
and
X-
nipple
~( 3.813" ID) ' ,
9400' md range for deepest set & I- -
-- ~devices) - RK Latches (-9250'
least amount of incl./azim, change. Iir /L~ 3-4 Camco KGB GLM's (1" OD
Top of Cement 1000' MD above ~ ~ I 9400' md) ,
Kekiktuk. -- -- -- -- -- ' ~Zone2A ~ Baker,SABL'3Packer I 13'000 [
~'on;~C'~~'~' 4-1/2" XN'NIPPLE I ......
~ ~.:~ (3.725" ID) I/ ~'~"
I
~O. MD-BKB -I'VD-SS
~6 35603503'
~5 55635259'
~4 66016303'
~3 75437003'
~2 83077703'
~1 89208403'
~ -~ I---- WLEG 113,°4°'1
B ~ 4-1/2I' belowthe of Zone 1C
hanger
top
'-- k
J 7" shoe set at base of Zone 1C to cover
!
Zone 1 B ~ coals
Note: All depths unless specified
are measured, and are subject to I ~-- 4-1/2" solid liner
adjustment given variations in
planned vs. actual drilled depths. I ~ High angle through Zone 1.
J k Proposed PBTD I 14,020' I
DATE REV. BY COMMENTS
ENDICOTT WELL 1-47A/M-20
APl NO:
PROPOSED DRILLING DIAGRAM
BP EXPLORATION, INC,
Well: 1-47a/M-20
t DrillQuest'
EIRI
~--~! L LI I~IG SERVICES
Target Name:
M-20 Target 1 (Rev 2)
M-20 Target 2 (Rev 2)
500
Proposal Target Summary
TVDss: TVDrkb: Wellhead Offset~:
10145.130 10201.130 508.90 N, 3203.67 E
10295.00 10351.00 346.49 N, 4064.34 E
Global Coordinate~:
5982675.00 N, 262250.00 E
5982485.00 N, 263105.00 E
f Proposal Data for 1-47a~.20 Wp 2
wes
: RVVel
Sc~e: linch = 5~ft
5~ 1~ 15~
2000
9663.9
SURFACE LOCATION REFERENCE
Horizontal Coordinates:
RKB Elevation:
Coordinate System:
5982269.40 N, 259031.62 E
41.50 ft Rig (EST)
14.50 ft Well (CBE)
56.00 ft RKB-AMSL
NAD27 Alaska State Planes,
Zone 3, US Foot
PLOT DATE:
Created By:
Checked By:
Approved By:
09 - OCT - 1997
Eastings
2500
10032.5
3000 7" Casing 3500
M-20 1 (Rev 2)
10201.00 TVD
508.90 N, 3203.67 E
4000
4 1/2" Liner
14018.35 MD
M-20 Target 1
10351.00 TVD
346.49 N, 4064.34 E
5OO
9070.31
-1500
-1500
I
5OO
Scale: linch = 50Oft
I000 1500 2000 2500 3000 3500 4000
Well: 1-47a/M-20
Proposal Target Summary
Glob~ Coord~ates:I
5982675.00 N ,262250.00 EI
5982485.00 N ,263105.00 El
Target Name ' TVDss:
M-20 Target l(Rev 2) 10145.00
M-20 Target 2 (Rev 2) 10295.00
TVDrkb: Wellhead Offsets'
10201.00 508.90 N, 3203.67 E
10351.00 346.49 N, 4064.34 E
Proposal Data for 1-~7a/M-20 Wp 2
1~.610Ilg. Ol I~S 197.14 E ~7.M
4~ ~1~ 142L27 S 7~.$9 EI I I.~
8000
SURFACE LOCATION REFERENCE PLOT DATE · 09 - OCT- 1997
Created By ·
Horizontal Coordinates: 5982269.40 N, 259031.62 E
RKB Elevation: 41.50 ft Rig (EST)
14.50 ft Well (CBE)
56.00 ft RKB- AMSL
Coordinate System:
NAD27 Alaska State Planes,
Zone 3, US Foot
Checked By.
Approved By ·
8500
9O00
9500
10000
10500
-500
Scale: linch = 500ft
Top Shale WalI/T[
0500.00
Top HRZ..
(
Base HRZ/LCU
/'~ Kekiktuk/K3B
7" Casing 2B
~;~;~-~-~"~;;~~~;~;~;~;2~-~;~M~~~:;~;2~2M/Lake Pelk~
"<C.~-- 10201.00 TVD 4 liT' Liner ~[. G0C (2A)
-~12620.00 / '
................................................................................................................ ~.,~.aoo .... ./ ......................... L40.1.8.3..5.MDEK~t. OWC (2,4)
:::25:222222222222::22::222:2:22222:2222222:2222:22222:2:222:2:22:2:22 ::2222:::22222222222 ~,.',.'..~,.' 22222 :::::::::::::::::::::::::::
................................................................................... ~20.T~g~(.I.~gy. 2,)...../.,4~.. X crt To" T,~r
....................................... l'02Or.O0"rwD ................ ~-~T'~Tl ~'
508.90 N, 3203.67 E
M-20 Target 2 (Rev 2)
, , . 1 fl't'~ 1 OOTVD
0 500 1000 1500 2000 2500 3000 3500
Section Azimuth: 65.500 {,True North) Vertical Section
Shared Services Drilling
Alaska Region
At( State Plane Zone3
Endicott MPI
~-47a/M-20- ~-47a/M-20 Wp 2
PROPOSAL REPORT
9 October, 1997
Proposal Reft pro278
Sperry-Sun Drilling Services
Proposal Report for 1-47a/M-20 - 1-47a/M-20 Wp 2
Shared Services Drilling
Alaska Region
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
8500.00 39.201 159.610 8049.01 8105.01
8600.00 35.094 148.214 8128.80 8184.80
8700.00 32.268 134.686 8212.12 8268.12
8800.00 31.080 119.585 8297.36 8353.36
8900.00 31.716 104.244 8382.86 8438.86
9000.00 34.072 90.134 8466.94 8522.94
9100.00 37.827 78.071 8547.99 8603.99
9200.00 42.605 68.112 8624.41 8680.41
9300.00 48.097 59.919 8694.72 8750.72
9400.00 54.076 53.077 8757.55 8813.55
9500.00 60.387 47.223 8811.68 8867.68
9584.86 65.924 42.817 8850.00 8906.00
9596.42 66.688 42.248 8854.65 8910.65
9600.00 68.688 42.248 8856.06 8912.06
9700.00 66.688 42.248 8895.64 8951.64
9800.00 66.688 42.248 8935.21 8991.21
9900.00 66.688 42.248 8974.78 9030.78
10000.00 66.688 42.248 9014.36 9070.36
10100.00 66.688 42.248 9053:93 9109.93
10200.00 66.688 42.248 9093.51 9149.51
10300.00 66.688 42.248 9133.08 9189.08
10400.00 66.688 42.248 9172.66 9228.66
10500.00 66.688 42.248 9212.23 9268.23
10600.00 66.688 42.248 9251.80 9307.80
10700.00 66.688 42.248 9291.38 9347.38
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section
(ft) (ft) (ft) (ft) (°/100ft) (ft)
1488.40 S 197.14 E 5980775.43 N 259180.79 E -437.84
1542.55 S 223.33 E 5980720.47 N 259205.23 E 8.000 -436.46
1585.82 S 257.51 E 5980676.12 N 259238.00 E 8.000 -423.31
1617.39 S 299.00 E 5980643.23 N 259278.45 E 8.000 -398.64
1636.63 S 347.00 E 5980622.45 N 259325.81E 8.000 -362.94
1643.18 S 400.58 E 5980614.19 N 259379.15 E 8.000 -316.90
1636.89 S 458.69 E 5980618.60 N 259437.43 E 8.000 -261.42
1617.91 S 520.20 E 5980635.60 N 259499.52 E 8.000 -197.58
1586.58 S 583.91 E 5980664.86 N 259564.20 E 8.000 -126.61
1543.54S 648.58 E 5980705.80 N 259630.23 E 8.000 -49.91
1489.61 S 712.97 E 5980757.64 N 259696.31E 8.000 31.04
1436.07 S 766.43 E 5980809.42 N 259751.47 E 8.000 101.89
1428.27 S 773.59 E 5980816.99 N 259758.88 E 8.000 111.64
1425.84S 775.80 E 5980819.35 N 259761.16 E 0.000 114.66
1357.86 S 837.54 E 5980885.31 N 259825.06 E 0.000 199.04
1289.88 S 899.29 E 5980951.27 N 259888.96 E 0.000 283.41
1221.90 S 961.03 E 5981017.23 N 259952.86 E 0.000 367.79
1153.91 S 1022.78 E 5981083.19 N 260016.76 E 0.000 452.17
1085.93 S 1084.52 E 5981149.15 N 260080.66 E 0.000 536.54
1017.95 S 1146.27 E 5981215.11 N 260144.56 E 0.000 620.92
949.97 S 1208.01E 5981281.07 N 260208.45 E 0.000 705.30
881.99 S 1269.76 E 5981347.03 N 260272.35 E 0.000 789.67
814.01S 1331.50 E 5981412.99 N 260336.25 E 0.000 874.05
746.03 S 1393.25 E 5981478.95 N 260400.15 E 0.000 958.43
678.04 S 1454.99 E 5981544.91N 260464.05 E 0.000 1042.80
Comment
Top Shale Wall/Tuffs
AK State Plane Zone3
Endicott MPI
Continued...
9 October, 1997 - 12:12 - 2 - DrillQuest
Sperry-Sun Drilling Services
Proposal Report for 1-47a/M-20 - 1-47a/M-20 Wp 2
Shared Services Drilling
Alaska Region
Measured
Depth
(ft)
Incl. Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
12500.00 69.898 66.679 9997.69 10053.69
12600.00 71.818 74.901 10030.53 10086.53
12700.00 74.079 82.929 10059.90 10115.90
12777.91 76,044 89.052 10080.00 10136.00
12800.00 76.630 90.768 10085.22 10141.22
12844.26 77.837 94.180 10095.00 10151.00
12900.00 79.416 98.435 10106.00 10162.00
12929.74 80.282 100.686 10111.24 10167.24
13000.00 80.282 100.686 10123.10 10179.10
13100.00 80.282 100.686 10139.98 10195.98
13129.74 80.282 100.686 10145.00 10201.00
13200.00 80.282 100.686 10156.86 10212.86
13300.00 80.282 100.686 10173.74 10229.74
13400.00 80.282 100.686 10190.62 10246.62
13500.00 80.282 100.686 10207.50 10263.50
13600.00 80.282 100.686 10224.38 10280.38
13700.00 80.282 100.686 10241.26 10297.26
13800.00 80.282 100.686 10258.14 10314.14
13811.00 80.282 100.686 10260.00 10316.00
13900.00 80.282 100.686 10275.02 10331.02
13959.11 80.282 100.686 10285.00 10341.00
14000,00 80.282 100.686 10291.90 10347.90
14018.35 80.282 100.686 10295.00 10351.00
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section
(ft) (ft) (ft) (ft) (°/100ft) (ft)
503.57 N 2604.31 E 5982688.96 N 261650.78 E 8.000
534.59 N 2693.43 E 5982717.09 N 261740.85 E 8.000
552.91 N 2787.17 E 5982732.39 N 261835.13 E 8.000
558.15 N 2862.22 E 5982735.21 N 261910.31 E 8.000
558.18 N 2883.68 E 5982734.55 N 261931.76 E 8.000
556.32 N 2926.79 E 5982731.30 N 261974.79 E 8.000
550.31N 2981.10 E 5982723.55 N 262028.87 E 8.000
545.45 N 3009.96 E 5982717.76 N 262057.56 E 8.000
532.61 N 3078.01 E 5982702.74 N 262125,17 E 0,000
514.33 N 3174.87 E 5982681.36 N 262221.39 E 0.000
508.90 N 3203.67 E 5982675.00 N 262250.00 E 0.000
496.05 N 3271.72 E 5982659.98 N 262317.61 E 0.000
477.78 N 3368.58 E 5982638.59 N 262413.82 E 0.000
459.50 N 3465.44 E 5982617.21 N 262510.04 E 0.000
441.23 N 3562.29 E 5982595.83 N 262606.26 E 0.000
422,95 N 3659.15 E 5982574.45 N 262702.48 E 0.000
404.67 N 3758.00 E 5982553.07 N 262798.69 E 0.000
386.40 N 3852.86 E 5982531.69 N 262894.91 E 0.000
384.39 N 3863.52 E 5982529.33 N 262905.50 E 0.000
368.12 N 3949.71 E 5982510.30 N 262991.13 E 0.000
357.32 N 4006.96 E 5982497.67 N 263048.00 E 0.000
349.84N 4046,57 E 5982488.92 N 263087.35 E 0.000
346.49 N 4064.34 E 5982485,00 N 263105.00 E 0.000
Comment
2578.65
2672.61
2765.50
2835.97 Est. OWC (ZA)
2855.51
2893.97 K1/1C
2940.89
2965.14
3021.74
3102.30
~.-,,,
3126.25
-/,,
3182.85
3263.41
3343.96
3424.52
3505.O8
3585.63
3666.19
3675.05 Est. Top Tar
3746.74
3794.36 K1A
3827.30
3842.08 4 1/2" Liner
AK State Plane Zone3
Endicott MPI
Continued...
9 October, 1997 - 12:12 - 4 - DriliQuest
MPI Well 1-47a/M20
Surface and Downhole
Section Line Ties
10/21/97
Locations
NW Sec 36
T12N R16E Umiat
X=255990..65
,Y=5984514.54
o~O
SW Sec36
T12N,R16E Umiat
X:255822.36
Y:5979237.41
5280
91°50'48.'
NW Sec 31
T12N R17E Umiat
NE Sec 36
T12N R16E Umiat
X-261267.72
Y=5984344.40
1-47a/M-20
1-47a/M-20 BHRZ/LCU :11455
Surface Location X=260946.23
X=259031.62 A Y=5982042.65-'~
Y=5982269.40-
I 2169 ~,,~2 ..... .-~
1 -47a/M-20 I~[ ~ I
Tie in Point :8500
X=259180,79 ~ , .-- -- --J _
Y=5980775,43 co ' ' ' 1972 I
~,1,1
I,
I,I
5280
91 °50'47"
4862
91 °48'28"
$ c__.~Ti o b.I ~1
1-47a/M-20
T2:14018
X--263105.00
I
!
I,
I
~ ',
.?-.
SW Sec 31
T12N R17E Umiat ·
SE Sec 36
T12N R1,6E Umiat
X=261099.45
Y=5979067.29
4884
91 °48'28"
NE Sec 31
T12N R17E Umiat
X=266126.82
Y=5984191.03
SE Sec 31
T12N R17E Umiat
X=265980.58
Y=5978913.24
....... :' ': ' ";:.' 3/'.':':: ;;';'h;':',;:,:,';:,¥r;'::,:?::;::C':::;:'::::,
MPI WELL 1-47aiM-20 (Wp2) SURFACE & PROPOSED DOWNHOLE LOCATIONS '10121197
ITEM NAME COMMENTS ALASKA STATE PLANE ZONE 3 (NAD 27) DECIMAL DEGREES (NAD 27) S & E SEC LINE OFFSETS SECTION, TOWN., NEAREST SECTION LINE OFFSETS
NO. Y X LATITUDE (N°) LONGITUDE (VW) FSL FEE RANGE, UMIAT, AK DIST. LINE I DIST. LINE
1 MPI 1-47a/M-20 Surface @ MPI Surface Location 5,982,269.40' 259,031.62' 70.352202° 147.956840° 3133 2168 SEC 36 T12N R16E 2145 N 2168 E
2 MPI 1-47a/M-20 MD: 8,500.00 Tie In Point 5,980,775.43' 259,180.79' 70.348135° 147.955239° 1972 1645 SEC 36 T12N R16E 1645 S 1972 E
3 MPI 1-47a/M-20 MD: 11,454.59 Base HRZ/LCU/KekiktuldK3B 5,982,042.65' 260,946.23' 70.351750° 147.941244° 2968 247 SEC 36 T12N R16E 2310 N 247 E
4 MPI 1-47a/M-20 MD: 14,018.35 4 1/2" Liner/T2 5,982,485.00' 236,105.00' 70.353145° 147.923840° 3479 2973 SEC 31 T12N R17E 1800 N 1895 W
Notes:
All coordinates shown are North American Datum 1927 (NAD 27).
Alaska State Plane Coordinates shown are Zone 3 (Feet).
F. Robert Bell & Assoc.
Jeff Cotton 564-4969 File Name: MpiB1021.xls 10/22/97
DATE I CHECK NO.
VENDOR ~[ .ASKAST 14 O0
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
100177 CKlOO197D 100. O0 100. oo
PYMT COMMENTS' pe~,~it to d~ill ~pplication
HANDLIN(~ INST: s/h Kathu Campoaaoe, x5122
................... -- ~_~ ~l
· IE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED
·WELL PERMIT CHECKLIST COMPANY 2~:)/4:) WELL NAME ,¢:2..Z"~'/' /-¢/;>,,'¢//'~.z~ PROGRAM: exp [] dev~redrll~.serv [] wellbore seg U'"ann. disposal para req Iq
FIELD & POOL .;Z- _~_C3.,,2 ~ ~ INIT CLASS _/~)~p,' 2/-,¢,,, Y GEOL AREA ~,~ ~.~ UNIT# .,/~) z-/,3"~ ON/OFF SHORE ~____~
ADMINISTRATION
APPR DATE
ENGINEERING
AP_P .r-~~ DA/TE
1. Permit fee attached ....................... Y
2. Lease number appropriate ................... Y
3. Unique well name and number ..................
Y
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............ IY
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ........... IY~
14. Conductor string provided ................... Y N"~
15. Surface casing protects all known USDWs ........... Y
16. CMT vol adequate to circulate on conductor & surf csg ..... Y
17. CMT vol adequate to tie-in long string to surf csg ........ Y
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost ....... N
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate ..... N
25. BOPEs, do they meet regulation
26. BOPE press rating appropriate; te'st't~' '-~'"~ ' ' '
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
30. Permit can be issued w/o hydrogen sulfide measures ..... Y, N//
31. Data presented on potential overpressure zones ....... Y
32. Seismic analysis of shallow gas zones ............. Y//N
33. Seabed condition survey (if off-shore) ............. ,/Y N
34. Contact name/phone for weeklyproqress reports ....... / Y N
[exploraTory only]
GEOLOGY
APPR DA~-E.,
REMARKS
GEOLOGY:
ENGINEERING: COMMISSION:
JDH ~ RNC~
Comments/Instructions:
HOW/lit - A:\FORMS\cheklist rev 07/97 ,. '
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Wed Feb 18 10:52:30 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/02/18
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/02/18
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HF~ADER
ENDICOTT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MM-80017
M. WORDEN
E. VAUGHN
Date _.~~Ol
1-47A/M-20 PB2
500292162571
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
18-FEB-98
MWD RUN 2
AK-MM-80017
M. WORDEN
E. VAUGHN
MWD RUN 3
AK-MM-80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK-M>4-80017
M. HANIK
J. CARLILE
MWD RUN 5
AK-MM-80017
M. HANIK
J. CARLILE
MWD RUN 6
AK-NIM- 80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
MWD RUN 8
AK-M~-80017
M. WORDEN
E. VAUGHN
MWD RUN 9
AK-MM-80017
M. WORDEN
E. VAUGHN
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
36
12N
16E
2146
2169
.00
55.20
14.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 8424.0
8.500 13085.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 - 4 ARE DIRECTIONAL WITH NATURAL GAMMA
RAY PROBE (NGP)
UTILIZING SCINTILLATION DETECTOR.
3. MWD RUNS 5-6 ARE DIRECTIONAL, DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER
TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY
PHASE-4(EWR4), COMPENSATED
NEUTRON POROSITY, AND STABILIZED LITHO-DENSITY (SLD).
4. A CHANGE FROM NGP TO DGR GAMMA PROBES OCCURS AT
12160'MD, 9938'TVI).
CNP, SLD, AND EWR4 DATA FROM l1890'MD, 9820' TO
12230'MD, 9968'TVD WERE
ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS DONE
WHILE GOING IN THE
HOLE FOR MWD RUN 5.
5. MWD RUN 8 IS DIRECTIONAL ONLY AND IS NOT PRESENTED.
THIS WELL KICKS OFF
FROM 1-47A/M-20 PB1 AT 12563'MD, 10080'TVD.
6. MWD RUN 9 IS DIRECTIONAL, DGR, AND EWR4.
7. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER
THE PHONE CONVERSATION
BETWEEN B. VOORHEES OF BP EXPLORATION (ALASKA), INC. AND
R KALISH OF SPERRY-
SUN DRILLING SERVICES ON 01/21/98.
8. MWD RUNS 1-6,8,9 REPRESENT WELL 1-47A/M-20 PB2 WITH
API#: 50-029-21625-71.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 13085'MD,
10198'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SPLALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SAPCING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY SANDSTONE
MATRIX FIXED HOLE SIZE.
SBDC = SMOOTHED BULK DENSITY COMPENSATED.
SCOR = SMOOTHED STANDOFF CORRECTION.
SNPE = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
SNNA = SMOOTHED AVERAGE OF NEUTRON NEAR DETECTOR COUNT
RATES.
SNFA = SMOOTHED AVERAGE OF NEUTRON FAR DETECTOR COUNT
RATES.
ENVIRONMENTAL PARAMETERS USED IN NUCLEAR LOG PROCESSING:
HOLE SIZE: 8.5"
MUD FILTRATE SALINITY: 1800-1600 PPM CHLORIDES MUD
WEIGHT: 10.8 PPG
FORMATION WATER SALINITY: 16000 PPM CHLORIDES FLUID
DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
.5000
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
START DEPTH
8372.0
8432.5
11889.0
11889.0
11889 0
11914 0
11914 0
11914 0
11914 0
11914 0
11923 5
11923 5
11923 5
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
STOP DEPTH
13027.5
13085.0
12563.0
12563 0
12563 0
13020 0
13020 0
13020 0
13020 0
13020 0
12563 0
12563 0
12563 0
EQUIVALENT UNSHIFTED DEPTH
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
BIT RUN NO MERGE TOP MERGE BASE
1 8429.0 9208.0
2 9208.0 9739.0
3 9739.0 10670.0
4 10670.0 12230.0
5 12230.0 12523.0
6 12523.0 12563.0
8 12563.0 12672.0
9 12672.0 13085.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
NPHI MWD P.U. 4 1 68
NCNT MWD CNTS 4 1 68
FCNT MWD CNTS 4 1 68
RHOB MWD G/CC 4 1 68
PEF MWD BARN 4 1 68
DRHO MWD G/CC 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean
DEPT 8372 13085 10728.5
ROP 1.8926 4665.23 34.1622
GR 14.082 320.424 107.423
RPX 2.857 2000 184.758
RPS 2.4972 2000 311.9
RPM 2.2984 2000 552.206
RPD 3.1592 2000 664.967
FET 5.1283 53.2939 24.0208
NPHI 8.812 81.0455 19.9615
NCNT 2096.22 4308.81 3512.92
FCNT 408 1685.34 1046.46
RHOB 1.1696 2.6926 2.1719
First Last
Nsam Reading Reading
9427 8372 13085
9306 8432.5 13085
9207 8372 13027.5
2124 11914 13020
2124 11914 13020
2124 11914 13020
2124 11914 13020
2124 11914 13020
1349 11889 12563
1349 11889 12563
1349 11889 12563
1280 11923.5 12563
PEF 0.1119 5.4418 1.64477 1280
DRHO -0.195 0.2734 0.0239155 1280
11923.5
11923.5
12563
12563
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 13085
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8372.0 9151.0
ROP 8432.5 9208.0
$
LOG HEADER DATA
DATE LOGGED: 23-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 9208.0
TOP LOG INTERVAL (FT) : 8429.0
BOTTOM LOG INTERVAL (FT) : 9208.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 33.6
MJ~XIMUM ANGLE: 17.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP
$
NATURAL GAMMA PROBE
BOREHOLE ~qD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STAi~DOFF (IN) :
EWR FREQUENCY (HZ) : ·
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
NGP SPC 176
8.500
8.5
LSND
10.00
52.0
9.4
2800
4.4
.000
.000
.000
.000
67.8
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 1 FT/H 4 1 68 4 2
GR MWD 1 AAPI 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 8372 9208 8790 1673 8372
ROP 1.9441 814.366 21.7012 1552 8432.5
GR 31.3611 103.397 79.7982 1559 8372
Last
Reading
9208
9208
9151
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 9208
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FI LE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9151 . 5 9669.5
ROP 9208 . 5 9739.5
$
LOG HEADER DATA
DATE LOGGED: 25-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REA~L-TIME) : MEMORY
TD DRILLER (FT) : 9739.0
TOP LOG INTERVAL (FT) : 9208.0
BOTTOM LOG INTERVAL (FT) : 9739.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 37.1
MAXIMUM ANGLE: 55.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAb94A PROBE
$
BOREHOLE ~qD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
TOOL NUMBER
NGP SPC 317
8.500
8.5
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
]~[UD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
I~gD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
LSND
10.00
53.0
9.0
2600
2.7
.000
· 000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEFT FT 4 1 68 0 1
ROP MWD 2 FT/H 4 1 68 4 2
GR MWD 2 AAPI 4 1 68 8 3
58.3
First
Name Min Max Mean Nsam Reading
DEFT 9151.5 9739.5 9445.5 1177 9151.5
ROP 2.9655 4665.23 62.3448 1063 9208.5
GR 40.1818 218.789 113.022 1037 9151.5
Last
Reading
9739.5
9739.5
9669.5
First Reading For Entire File .......... 9151.5
Last Reading For Entire File ........... 9739.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FI LE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9671.0 10600.0
ROP 9741.5 10670.0
$
LOG HEADER DATA
DATE LOGGED: 28-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 10670.0
TOP LOG INTERVAL (FT): 9739.0
BOTTOM LOG INTERVAL (FT): 10670.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 57.9
MAXIMUM ANGLE: 74.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAM~A PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
TOOL NUMBER
NGP SPC 176
8.500
8.5
LSND
10.30
19.0
9.0
2500
2.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 3 FT/H 4 1 68 4 2
GR MWD 3 AAPI 4 1 68 8 3
63.3
First
Name Min Max Mean Nsam Reading
DEPT 9671 10670 10170.5 1999 9671
ROP 4.8177 2049.61 32.6369 1858 9741.5
GR 79.2293 229.099 146.51 1859 9671
Last
Reading
10670
10670
10600
First Reading For Entire File .......... 9671
Last Reading For Entire File ........... 10670
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10601.0
ROP 10672.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12160.0
12230.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS ]~gJD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
01-DEC-97
ISC 5.07
MEMORY
12230.0
10670.0
12230.0
61.4
69.4
TOOL NUMBER
NGP SPC 317
8.500
8.5
LSND
10.30
56.0
9.0
2200
3.0
.000
.000
.000
.000
70.5
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
Data Format Specification Recozd
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 4 FT/H 4 1 68 4' 2
GR MWD 4 AJ~PI 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10601 12230 11415.5 3259 10601
ROP 4.4768 205.078 39.508 3117 10672
GR 20.5602 320.424 131.901 3119 10601
Last
Reading
12230
12230
12160
First Reading For Entire File .......... 10601
Last Reading For Entire File ........... 12230
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FCNT 11889.0
NCNT 11889.0
NPHI 11889.0
FET 11914 0
RPD 11914 0
RPM 11914 0
RPS 11914 0
RPX 11914 0
PEF 11923 5
DRHO 11923 5
RHOB 11923.5
GR 12160.5
ROP 12230.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMARAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
STOP DEPTH
12411.0
12411.0
12411.0
12437.0
12437.0
12437.0
12437.0
12437.0
12445.5
12445.5
12445.5
12456.5
12521.5
04-DEC-97
ISC 5.07
MEMORY
12523.0
12230.0
12523.0
67.4
71.7
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
63.0
9.0
1800
2.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.950
.453
.580
1.300
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
RPS MWD 5 OHMS4 4 1 68
RPM MWD 5 OHMM 4 1 68
RPD MWD 5 OPrMM 4 1 68
FET MWD 5 HOUR 4 1 68
ROP MWD 5 FT/H 4 1 68
GR MWD 5 API 4 1 68
RPX MWD 5 OHN~4 4 1 68
NPHI MWD 5 P.U. 4 1 68
NCNT MWD 5 CNTS 4 1 68
FCNT MWD 5 CNTS 4 1 68
RHOB MWD 5 G/CC 4 1 68
DRHO MWD 5 G/CC 4 1 68
PEF MWD 5 BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
75.5
Name Min Max Mean
DEPT 11889 12521.5 12205.2
RPS 4.5038 2000 495.662
RPM 3.9046 2000 791.37
RPD 7.5665 2000 947.318
FET 7.3942 53.2939 34.6531
ROP 2.412 458.789 20.0362
GR 14.9648 112.342 37.8016
RPX 4.5204 2000 270.031
NPHI 8.812 81.0455 19.9556
NCNT 2096.22 4308.81 3506.9
FCNT 408 1685.34 1065.24
Nsam
1266
1047
1047
1047
1047
583
593
1047
1045
1045
1045
First
Reading
11889
11914
11914
11914
11914
12230.5
12160.5
11914
11889
11889
11889
Last
Reading
12521.5
12437
12437
12437
12437
12521.5
12456.5
12437
12411
12411
12411
RHOB 1.1696 2.6926 2.14793 1045
DRHO -0.195 0.2734 0.0272139 1045
PEF 0.1119 5.4418 1.77949 1045
11923.5
11923.5
11923.5
12445.5
12445.5
12445.5
First Reading For Entire File .......... 11889
Last Reading For Entire File ........... 12521.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
6
.5000
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
GR
ROP
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
START DEPTH
12412.0
12412 0
12412 0
12438 0
12438 0
12438 0
12438 0
12438 0
12447 0
12447 0
12447 0
12458 0
12525 0
SURFACE SOFTWARE VERSION:
STOP DEPTH
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
12563 0
06-DEC-97
ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REJLL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ~GLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTRO/W_AG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STA~BILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MEMORY
12820.0
12523.0
12820.0
71.3
75.5
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
58.0
9.1
1600
2.8
.950
.446
.600
1.350
81.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RPX MWD 6 OHMM 4 1 68
RPS MWD 6 OHM!M 4 1 68
ROP MWD 6 FT/H 4 1 68
RPM MWD 6 OHlVIM 4 1 68
RPD MWD 6 OHMM 4 1 68
FET ]~WD 6 HOUR 4 1 68
GR MWD 6 API 4 1 68
NPHI MWD 6 P.U. 4 1 68
NCNT MWD 6 CNTS 4 1 68
FCNT MWD 6 CNT$ 4 1 68
RHOB MWD 6 G/CC 4 1 68
DRHO MWD 6 G/CC 4 1 68
PEF MWD 6 BARN 4 1 68
4
8
12
16
20
24
28
32
36
40
44
48
52
2
3
4
5
6
7
8
9
10
11
12
13
14
Name Min Max Mean Nsam
DEPT 12412 12563 12487.5 303
RPX 13.0681 2000 158.815 251
RPS 14.2858 2000 227.876 251
ROP 2.7039 455.273 28.2646 77
RPM 13.8272 2000 613.749 251
RPD 14.4447 2000 1063 251
FET 5.1935 38.335 25.5851 251
GR 14.3846 150.499 66.7618 211
NPHI 10.3009 45.9653 19.9946 303
NCNT 2630.5 4153.24 3533.1 303
FCNT 634.684 1384.81 981.81 303
RHOB 2.0721 2.5919 2.27982 233
DRHO -0.095 0.2626 0.00956352 233
PEF 0.1971 3.6306 1.04918 233
First
Reading
12412
12438
12438
12525
12438
12438
12438
12458
12412
12412
12412
12447
12447
12447
Last
Reading
12563
12563
12563
12563
12563
12563
12563
12563
12563
12563
12563
12563
12563
12563
First Reading For Entire File .......... 12412
Last Reading For Entire File ........... 12563
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 8
DEPTH INCREMENT: .5000
FI LE SUNU~ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
ROP 12563.5 12672 . 5
$
LOG HEADER DATA
DATE LOGGED: 13-DEC-97
S O FTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 12672.0
TOP LOG INTERVAL (FT) : 12563.0
BOTTOM LOG INTERVAL (FT): 12672.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
MAXIMUM ANGLE: 71.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
BOREHOLE A_ND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL NUMBER
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
8.500
8.5
REMARKS:
$
Data Format Specification Record
LSND
10.80
60.0
9.5
1600
2.8
.000
.000
.000
.000
67.8
.0
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Ma× frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 8 FT/H 4 1 68 4 2
First
Name Min Max Mean Nsam Reading
DEPT 12563.5 12672.5 12618 219 12563.5
ROP 1. 8926 48. 9337 14. 2048 219 12563.5
Last
Reading
12672.5
12672.5
First Reading For Entire File .......... 12563.5
Last Reading For Entire File ........... 12672.5
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
File Header
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
ROP 12563.5 12672.5
FET 12608 0
RPD 12608 0
RPM 12608 0
RPS 12608 0
RPX 12608 0
GR 12616 0
$
LOG HEADER DATA
DATE LOGGED '~
S O FTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
BOREHOLE A/qD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13020.0
13020.0
13020.0
13020.0
13020.0
13027.5
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMIC) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
15-DEC-97
ISC 5.07
MEMORY
13085.0
12672.0
13085.0
72.2
80.8
TOOL NUMBER
P0896CRG6
P0896CRG6
8.500
8.5
LSND
11.00
64.0
9.5
1600
2.4
.460
.230
.580
1.000
78.9
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name
DEPT
GR
RPX
RPS
RPM
RPD
ROP
FET
Service Order Units Size Nsam Rep
FT 4 1 68
MWD 9 API 4 1 68
MWD 9 OHMM 4 1 68
MWD 9 OHM~ 4 1 68
M-WD 9 OHN~ 4 1 68
MWD 9 OHM]V[ 4 1 68
MWD 9 FT/H 4 1 68
MWD 9 HOUR 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Min Max Mean
DEPT 12608 13085 12846.5
GR 14.082 133.919 32.4254
RPX 2.857 277.09 84.1243
RPS 2.4972 329.776 103.796
RPM 2.2984 2000 228.341
RPD 3.1592 2000 183.922
ROP 2.6431 1944.14 20.6197
FET 5.1283 23.5875 10.0482
Nsam
955
824
825
825
825
825
825
825
First
Reading
12608
12616
12608
12608
12608
12608
12673
12608
Last
Reading
13085
13027.5
13020
13020
13020
13020
13085
13020
First Reading For Entire File .......... 12608
Last Reading For Entire File ........... 13085
File Trailer
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/18
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.010
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/02/18
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/02/18
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Mon Feb 16 14:29:14 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/02/16
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/02/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
ENDICOTT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MM-80017
M. WORDEN
E. VAUGHN
M CROF LMEB
1-47A/M20 PB1
500292162570
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
16-FEB-98
MWD RUN 2
AK-MM-80017
M. WORDEN
E. VAUGHN
MWD RUN 3
AK-MM-80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK-MM-80017
M. HANIK
J. CARLILE
MWD RUN 5
AK-MM- 80017
M. HANIK
J. CARLI LE
MWD RUN 6
AK-MM-80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
MWD RUN 7
AK-MM-80017
M. HANIK
J. CARLILE
I I/
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
36
12N
16E
2146
2169
.00
55.20
14.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 8424.0
8.500 12920.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 - 4 ARE DIRECTIONAL WITH NATURAL GAMMA
RAY PROBE (NGP)
UTILIZING SCINTILLATION DETECTOR.
3. MWD RUNS 5 - 7 ARE DIRECTIONAL, DUAL GAMMA RAY
(DGR), ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4), COMPENSATED NEUTRON POROSITY
(CNP), AND
STABILIZED LITHO-DENSITY (SLD).
4. A CHANGE FROM SCINTILLATION DETECTOR (NGP) TO GEIGER
MUELLER TUBE DETECTORS
(DGR) OCCURS AT 12160'MD, 9938'TVD.
5. EWR 4, CNP AND SLD DATA FROM 11890'MD, 9820'TVD TO
12230'MD, 9968'TVD WERE
ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS
WHILE TRIPPING IN THE
HOLE FOR MWD RUN 5.
6. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER
THE PHONE CONVERSATION
BETWEEN B VOORHEES OF BP EXPLORATION (ALASKA), INC. AND
R KALISH OF SPERRY-
SUN DRILLING SERVICES ON 01/19/98.
7. MWD RUNS 1 - 7 REPRESENT WELL 1-47A/PB1 WITH API#:
50-029-21625-70.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 12,920' MD,
10,172' TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMlVLA RAY.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
MATRIX FIXED HOLE SIZE)
SBDC = SMOOTHED BULK DENSITY COMPENSATED.
SCOR = SMOOTHED STANDOFF CORRECTION.
SNPE = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
SNNA = SMOOTHED AVERAGE OF NEUTRON NEAR DETECTOR COUNTS.
SNFA = SMOOTHED AVERAGE OF NEUTRON FAR DETECTOR COUNTS.
ENVIRONMENTAL PARAMETERS USED IN NUCLEAR LOG PROCESSING:
HOLE SIZE: 8.5"
MUD FILTRATE SALINITY: 1800-1600 PPM CHLORIDES
FORMATION WATER SALINITY: 16000 PPM CHLORIDES
MUD WEIGHT: 10.8 PPG
FLUID DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 8372.0 12849.5
ROP 8429.0 12916.0
FCNT 11889.0 12804.0
NCNT 11889.0 12804.0
NPHI 11889.0 12804.0
FET 11914.0 12830.0
RPD 11914.0 12830.0
RPM 11914.0 12830.0
RPS 11914.0 12830.0
RPX 11914.0 12830.0
PEF 11923.5 12838.5
DRHO 11923.5 12838.5
RHOB 11923.5 12838.5
$
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
.5000
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 8429.0 9208.0
2 9208.0 9739.0
3 9739.0 10670.0
MWD
IVieD
MWD
$
REMARKS:
4 10670.0 12230.0
5 12230.0 12523.0
6 12523.0 12820.0
7 12820.0 12920.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
RPD MWD OHMM 4 1 68
NPHI MWD P.U. 4 1 68
GR MWD AAPI 4 1 68
ROP MWD FT/H 4 1 68
RHOB MWD G/CC 4 1 68
RPX MWD OHMS4 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
FCNT MWD CNTS 4 1 68
NCNT MWD CNTS 4 1 68
DRHO MWD G/CC 4 1 68
PEF MWD BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean
DEPT 8372 12916 10644
RPD 3.7617 2000 1043.45
NPHI 8.812 81.0455 20.3329
GR 13.3045 320.424 109.317
ROP 1.944 4665.23 39.5279
RHOB 1.1696 2.6926 2.18364
RPX 3.8442 2000 245.696
RPS 3.7489 2000 427.021
RPM 3.5588 2000 778.858
FET 5.1935 53.2939 27.4963
FCNT 408 1685.34 981.937
NCNT 2096.22 4308.81 3495.55
DRHO -0.195 0.2734 0.0219604
PEF 0 5.4418 1.37942
First Last
Nsam Reading Reading
9089 8372 12916
1833 11914 12830
1831 11889 12804
8956 8372 12849.5
8975 8429 12916
1831 11923.5 12838.5
1833 11914 12830
1833 11914 12830
1833 11914 12830
1833 11914 12830
1831 11889 12804
1831 11889 12804
1831 11923.5 12838.5
1831 11923.5 12838.5
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 12916
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8372.0 9151.0
ROP 8432.5 9208.0
$
LOG HEADER DATA
DATE LOGGED: 23-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 33.6
MAXIMUM ANGLE: 17.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE ~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
9208.0
8429.0
9208.0
TOOL NUMBER
NGP SPC 176
8.500
8.5
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
LSND
10.00
52.0
9.4
2800
4.4
.000
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 AAPI 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
67.8
First
Name Min Max Mean Nsam Reading
DEPT 8372 9208 8790 1673 8372
GR 31.3611 103.397 79.7982 1559 8372
ROP 1.9441 814.366 21.7012 1552 8432.5
Last
Reading
9208
9151
9208
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 9208
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9151.5 9669.5
ROP 9208.5 9739.5
$
LOG HEADER DATA
DATE LOGGED: 25-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 37.1
MAXIMUM ANGLE: 55.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAM~4A PROBE
$
BOREHOLE ~qD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S) :
MUD PH:
MUD CHLORIDES PPM) :
FLUID LOSS (C3 :
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
9739.0
9208.0
9739.0
TOOL NUMBER
NGP SPC 317
8.500
8.5
LSND
10.00
53.0
9.0
2600
2.7
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERM?ERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STA/~DOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
ROP MWD 2 FT/H 4 1 68 8 3
58.3
First
Name Min Max Mean Nsam Reading
DEPT 9151.5 9739.5 9445.5 1177 9151.5
GR 40.1818 218.789 113.022 1037 9151.5
ROP 2.9655 4665.23 62.3448 1063 9208.5
Last
Reading
9739.5
9669.5
9739.5
First Reading For Entire File .......... 9151.5
Last Reading For Entire File ........... 9739.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9671.0
ROP 9741.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10600.0
10670.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S) :
MUD PH:
MUD CHLORIDES PPM) :
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
28 -NOV- 97
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
10670.0
9739.0
10670.0
57.9
74.8
TOOL NUMBER
NGP SPC 176
8.500
8.5
LSND
10.30
19.0
9.0
2500
2.2
.000
.000
.000
.000
63.3
Dat
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL ST~d~DOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
a Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 AAPI 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9671 10670 10170.5 1999 9671
GR 79.2293 229.099 146.51 1859 9671
ROP 4.8177 2049.61 32.6369 1858 9741.5
Last
Reading
10670
10600
10670
First Reading For Entire File .......... 9671
Last Reading For Entire File ........... 10670
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Nuraber ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE STkRT DEPTH
GR 10601.0
ROP 10672.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12160.0
12230.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MTJD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STT~NDOFF (IN) :
EWR FREQUENCY (HZ) :
01-DEC-97
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
12230.0
10670.0
12230.0
61.4
69.4
TOOL NUMBER
NGP SPC 317
8.500
8.5
LSND
10.30
56.0
9.0
2200
3.0
.000
.000
.000
.000
70.5
.6
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 4 AAPI 4 1 68
ROP MWD 4 FT/H 4 1 68
Code
Offset
0
4
8
Channel
1
2
3
Name Min Max Mean
DEPT 10601 12230 11415.5
GR 20.5602 320.424 131.901
ROP 4.4768 205.078 39.508
First Last
Nsam Reading Reading
3259 10601 12230
3119 10601 12160
3117 10672 12230
First Reading For Entire File .......... 10601
Last Reading For Entire File ........... 12230
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
6
header
data for each bit
run
in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
GR
ROP
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
11889 0
11889 0
11889 0
11914 0
11914 0
11914 0
11914 0
11914 0
11923 5
11923 5
11923 5
12160 5
12230 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12411.0
12411.0
12411.0
12437.0
12437.0
12437.0
12437.0
12437.0
12445.5
12445.5
12445.5
12456.5
12521.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
04-DEC-97
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
12523.0
12230.0
12523.0
67.4
71.7
TOOL NLTMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
63.0
9.0
1800
2.8
.950
.453
.580
1.300
75.5
I~ATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STT~DOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Loggin9 Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 5 API 4 1 68
RPX MWD 5 OHMM 4 1 68
RPS MWD 5 OHM>4 4 1 68
RPM MWD 5 OHMM 4 1 68
RPD MWD 5 OHMM 4 1 68
NPHI MWD 5 P.U. 4 1 68
ROP MWD 5 FT/H 4 1 68
FET MWD 5 HOUR 4 1 68
FCNT MWD 5 CNTS 4 1 68
NCNT MWD 5 CNTS 4 1 68
RHOB MWD 5 G/CC 4 1 68
DRHO MWD 5 G/CC 4 1 68
PEF MWD 5 BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean Nsam
DEPT 11889 12521.5 12205.2 1266
GR 14.9648 112.342 37.8016 593
RPX 4.5204 2000 270.031 1047
RPS 4.5038 2000 495.662 1047
RPM 3.9046 2000 791.37 1047
RPD 7.5665 2000 947.318 1047
NPHI 8.812 81.0455 19.9556 1045
ROP 2.412 458.789 20.0362 583
FET 7.3942 53.2939 34.6531 1047
FCNT 408 1685.34 1065.24 1045
NCNT 2096.22 4308.81 3506.9 1045
RHOB 1.1696 2.6926 2.14793 1045
DRHO -0.195 0.2734 0.0272139 1045
PEF 0.1119 5.4418 1.77949 1045
First
Reading
11889
12160.5
11914
11914
11914
11914
11889
12230.5
11914
11889
11889
11923.5
11923.5
11923.5
Last
Reading
12521.5
12456.5
12437
12437
12437
12437
12411
12521.5
12437
12411
12411
12445.5
12445.5
12445.5
First Reading For Entire File .......... 11889
Last Reading For Entire File ........... 12521.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FI LE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FCNT 12412.0
NCNT 12412.0
NPHI 12412.0
FET 12438.0
RPD 12438.0
RPM 12438.0
RPS 12438.0
RPX 12438.0
PEF 12447.0
DRHO 12447.0
RHOB 12447.0
GR 12458.0
ROP 12525.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
STOP DEPTH
12713.5
12713.5
12713.5
12734.5
12734.5
12734.5
12734.5
12734.5
12748.0
12748.0
12748.0
12755.5
12821.0
06-DEC-97
PCDWD 1.35A / ISC 5.07
NGP 5.85 / CIM 3.94
MEMORY
12820.0
12523.0
12820.0
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
I~gJD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAdK CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
71.3
75.5
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
58.0
9.1
1600
2.8
.950
.446
.600
1.350
81.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR Iq~D 6 AP I 4 1 68 4 2
RPX MWD 6 OHM}4 4 1 68 8 3
RPS MWD 6 OHMS4 4 1 68 12 4
RPM MWD 6 OHMM 4 1 68 16 5
RPD MWD 6 OHN~4 4 1 68 20 6
NPHI MWD 6 P.U. 4 1 68 24 7
ROP FFWD 6 FT/H 4 1 68 28 8
FET MWD 6
FCNT ~D 6
NCNT MWD 6
RHOB MWD 6
DRHO MWD 6
PEF I~WD 6
HOUR 4 1 68
CNTS 4 1 68
CNTS 4 1 68
G/CC 4 1 68
G/CC 4 1 68
BARN 4 1 68
32
36
40
44
48
52
9
10
11
12
13
14
Name
DEPT
GR
RPX
RPS
RPM
RPD
NPHI
ROP
FET
FCNT
NCNT
RHOB
DRHO
PEF
Min
12412
13.3045
3.8442
3 7489
3 5588
3 7617
10 3009
2 7039
5 1935
613.249
2630.5
2.0721
-0.095
0
Max Mean Nsam
12821 12616.5 819
150.499 43.9705 596
2000 217.881 594
2000 331.595 594
2000 632.46 594
2000 944.533 594
46.1914 20.3741 604
1937.11 37.9843 593
38.335 15.386 594
1384.81 903.023 604
4153.24 3511.49 604
2.5919 2.2423 603
0.2626 0.00516401 603
3.6306 0.749549 603
First
Reading
12412
12458
12438
12438
12438
12438
12412
12525
12438
12412
12412
12447
12447
12447
Last
Reading
12821
12755.5
12734.5
12734.5
12734.5
12734.5
12713.5
12821
12734.5
12713.5
12713.5
12748
12748
12748
First Reading For Entire File .......... 12412
Last Reading For Entire File ........... 12821
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FI LE SUNmtzlRY
VENDOR TOOL CODE START DEPTH
FCNT
NCNT
NPHI
RPM
RPS
FET
RPD
RPX
PEF
DRHO
RHOB
GR
ROP
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
12714 0
12714 0
12714 0
12734 0
12734 0
12735 0
12735 0
12735.0
12748.5
12748.5
12748.5
12756.0
12821.5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE iNCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12804.0
12804.0
12804.0
12830.0
12830.0
12830.0
12830.0
12830.0
12838.5
12838.5
12838.5
12849.5
12916.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE A_ND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
08-DEC-97
PCDWD 1.35A / IGC 5.07
NGP 5.85 / CIM 3.94
MEMORY
12920.0
12820.0
12920.0
74.7
76.7
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
59.0
9.2
1600
2.8
1.000
.375
.800
1.400
80.5
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 7 API 4 1 68
RPX MWD 7 OHMM 4 1 68
RPS MWD 7 OHMM 4 1 68
RPM MWD 7 OHMM 4 1 68
RPD MWD 7 OHMM 4 1 68
NPHI MWD 7 P.U. 4 1 68
ROP MWD 7 FT/H 4 1 68
FET MWD 7 HOUR 4 1 68
FCNT MWD 7 CNTS 4 1 68
NCNT MWD 7 CNTS 4 1 68
RHOB MWD 7 G/CC 4 1 68
DRHO MWD 7 G/CC 4 1 68
PEF MWD 7 BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean
DEPT 12714 12916 12815
GR 17.5505 51.2987 24.4525
RPX 95.6509 419.933 197.791
RPS 146.732 1236.74 344.443
RPM 299.398 2000 1151.54
RPD 573.152 2000 1873.06
NPHI 18.7661 29.777 22.3978
ROP 3.9016 2682.42 188.383
FET 8.3931 28.8124 25.9314
FCNT 667.421 843.741 764.151
NCNT 3039.15 3647.74 3375.77
RHOB 2.0624 2.3682 2.19507
DRHO -0.042 0.1641 0.0481329
PEF 0.2925 2.0975 1.17619
Nsam
405
188
191
193
193
191
181
190
191
181
181
181
181
181
First
Reading
12714
12756
12735
12734
12734
12735
12714
12821.5
12735
12714
12714
12748.5
12748.5
12748.5
Last
Reading
12916
12849.5
12830
12830
12830
12830
12804
12916
12830
12804
12804
12838.5
12838.5
12838.5
First Reading For Entire File .......... 12714
Last Reading For Entire File ........... 12916
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/16
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/02/16
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing
Technical Services
Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/02/16
Origin ................... STS
Reel Name..' .............. UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Thu Feb 19 11:29:45 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/02/19
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/02/19
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
ENDICOTT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
1-47A/M-20
500292162501
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
19-FEB-98
MWD RUN 1
AK-MM-80017
M. WORDEN
E. VAUGHN
MWD RUN 2
AK-MM-80017
M. WORDEN
E. VAUGHN
MWD RUN 3
AK-MM-80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK-MM-80017
M. HANIK
J. CARLILE
MWD RUN 5
AK-MM-80017
M. HANIK
J. CARLILE
MWD RUN 6
AK-MM-80017
M. HANIK
J. CARLILE
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
MWD RUN 11
AK-MM- 80017
M. HANIK
J. CARLI LE
MWD RUN 12
AK-M~4-80017
M. HANIK
J. CARLILE
IvfWD RUN 13
AK-MM- 80017
M. HANIK
E. VAUGHN
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
36
12N
16E
2146
2169
.00
55.20
14.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 8424.0
8.500 7.000 12579.0
6.000 14075.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1-4 ARE DIRECTIONAL WITH NATURAL GAMMA RAY
PROBE (NGP) UTILIZING
SCINTILLATION DETECTOR.
3. MWD RUNS 5-6 ARE DIRECTIONAL, DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER
TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY
PHASE-4(EWR4), COMPENSATED
NEUTRON POROSITY (CNP), AND STABILIZED LITHO-DENSITY
(SAD) .
4. A CHANGE FROM SCINTILLATION DETECTOR (NGP) TO GEIGER
MUELLER TUBE DETECTORS
(DGR) AT 12160'MD, 9938'TVD.CNP, SLD, AND EWR4 DATA FROM
l1890'MD, 9820'TVD
TO 12230'MD, 9968'TVD WAS ACQUIRED ON A MEASUREMENT
AFTER DRILLING (MAD)
PASS WHILE RUNNING IN THE HOLE FOR MWD RUN 5.
5. THIS WELL KICKS OFF FROM 1-47A/M-20 PB1 AT 12589'MD,
10088'TVD. MWD RUN 10
MADE NO FOOTAGE IN THE NEW HOLE, AND IS NOT PRESENTED.
NO NUCLEAR LOG DATA
EXISTS IN THIS WELLBORE BELOW THE KICKOFF POINT.
6. MWD RUNS 11 - 13 ARE DIRECTIONAL, DGR, AND EWR4.
7. DEPTH SHIFT/CORRECTION OF MWD DATA IS WAIVED AS PER
THE PHONE CONVERSATION
BETWEEN B. VOORHEES OF BP EXPLORATION (ALASKA), INC. AND
R KALISH OF SPERRY
SUN DRILLING SERVICES ON 01/21/98.
8. MWD RUNS 1-6,11-13, REPRESENT WELL 1-47A/M-20 WITH
API#: 50-029-21625-01.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 14075'MD,
10356'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY-SANDSTONE
MATRIX FIXED HOLE SIZE.
SNNA = SMOOTHED AVERAGE OF NEUTRON NEAR DETECTOR COUNT
RATES.
SNFA = SMOOTHED AVERAGE OF NEUTRON FAR DETECTOR COUNT
RATRES.
SBDC = SMOOTHED BULK DENSITY COMPENSATED.
SNPE = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
SCOR = SMOOTHED STANDOFF CORRECTION.
ENVIRONMENTAL PARAMETRS USED IN NUCLEAR LOG PROCESSING:
HOLE SIZE: 8.5"
MUD FILTRATE: 1600-1800 PPM CHLORIDES MUD WEIGHT:
10.8 PPG
FORMATION WATER SALINITY: 16000 PPM FLUID
DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC LITHOLOGY:
SANDSTONE
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
$
.5000
START DEPTH
8372 0
8432 5
11889 0
11889 0
11889 0
11914 0
11914 0
11914 0
11914 0
11914 0
11923 5
11923 5
11923 5
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
STOP DEPTH
14014.5
14075.0
12589 0
12589 0
12589 0
14021 5
14021 5
14021 5
14021 5
14021 5
12589.0
12589.0
12589.0
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO
1
2
3
4
5
6
11
12
13
MERGE TOP
8429 0
9208 0
9739 0
10670 0
12230 0
12523 0
12589 0
12724 0
12779 0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
9208.0
9739.0
10670.0
12230.0
12523.0
12820.0
12724.0
12779.0
14075.0
Name Service Order Units Size Nsam
DEPT FT 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHM}4 4 1 68
RPS MWD OHMM 4 1 68
RPM MWD OHMM 4 1 68
RPD MWD OHMM 4 1 68
NPHI MWD P.U. 4 1 68
RHOB I~WD G/CC 4 1 68
ROP MWD FT/H 4 1 68
FET MWD HOUR 4 1 68
PEF MWD BARN 4 1 68
DRHO I~WD G/CC 4 1 68
NCNT MWD CNTS 4 1 68
FCNT MWD CNTS 4 1 68
Rep Code Offset
Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max
DEPT 8372 14075
GR 5.5537 320.424
RPX 3.0139 2000
RPS 2.9445 2000
RPM 2.9295 2000
RPD 3.7716 2000
NPHI 8.812 81.0455
RHOB 1.1696 2.6926
Mean Nsam
11223.5 11407
109.63 11286
128.581 4216
210.512 4216
350.098 4216
441.101 4216
19.911 1401
2.17224 1332
First
Reading
8372
8372
11914
11914
11914
11914
11889
11923.5
Last
Reading
14075
14014.5
14021.5
14021.5
14021.5
14021.5
12589
12589
ROP 1.2191 4665.23 38.3488 11286
FET 0.7677 53.2939 13.4851 4216
PEF 0.1119 5.4418 1.6013 1332
DRHO -0.195 0.2734 0.0226212 1332
NCNT 2096.22 4308.81 3515.5 1401
FCNT 408 1685.34 1039.4 1401
8432.5
11914
11923.5
11923.5
11889
11889
14075
14021.5
12589
12589
12589
12589
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 14075
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8372.0 9151.0
ROP 8432.5 9208.0
$
LOG HEADER DATA
DATE LOGGED: 23-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 9208.0
TOP LOG INTERVAL (FT) : 8429.0
BOTTOM LOG INTERVAL (FT) : 9208.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 33.6
MAXIMUM ANGLE: 17.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
NGP SPC 176
8.500
8.5
LSND
10.00
52.0
9.4
2800
4.4
.000
.000
.000
.000
67.8
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DE?T FT 4 1 68 0 1
ROP MWD 1 FT/H 4 1 68 4 2
GR MWD 1 AAPI 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 8372 9208 8790 1673 8372
ROP 1.9441 814.366 21.7012 1552 8432.5
GR 31.3611 103.397 79.7982 1559 8372
Last
Reading
9208
9208
9151
First Reading For Entire File .......... 8372
Last Reading For Entire File ........... 9208
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Connnent Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9151.5 9669.5
ROP 9208.5 9739.5
$
LOG HEADER DATA
DATE LOGGED: 25-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 9739.0
TOP LOG INTERVAL (FT) : 9208.0
BOTTOM LOG INTERVAL (FT) : 9739.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 37.1
I~J~X~IMUM ANGLE: 55.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAjV94A PROBE
$
TOOL NITMBER
NGP SPC 317
BOREHOLE ~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
I~JD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.500
8.5
LSND
10.00
53.0
9.0
2600
2.7
.000
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 2 FT/H 4 1 68 4 2
GR MWD 2 AAPI 4 1 68 8 3
58.3
First
Name Min Max Mean Nsam Reading
DEPT 9151.5 9739.5 9445.5 1177 9151.5
ROP 2.9655 4665.23 62.3448 1063 9208.5
GR 40.1818 218.789 113.022 1037 9151.5
Last
Reading
9739.5
9739.5
9669.5
First Reading For Entire File .......... 9151.5
Last Reading For Entire File ........... 9739.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9671.0 10600.0
ROP 9741.5 10670.0
$
LOG HEADER DATA
DATE LOGGED: 28-NOV-97
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 10670.0
TOP LOG INTERVAL (FT) : 9739.0
BOTTOM LOG INTERVAL (FT): 10670.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 57.9
MJiXIMUM ANGLE: 74.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
BOREHOLE ~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
TOOL NUMBER
NGP SPC 176
8.500
8.5
LSND
10.30
MUD VISCOSITY S) :
MUD PH:
MUD CHLORIDES PPM) :
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
19.0
9.0
2500
2.2
.000
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 3 FT/H 4 1 68 4 2
GR MWD 3 AAPI 4 1 68 8 3
63.3
First
Name Min Max Mean Nsam Reading
DEPT 9671 10670 10170.5 1999 9671
ROP 4.8177 2049.61 32.6369 1858 9741.5
GR 79.2293 229.099 146.51 1859 9671
Last
Reading
10670
10670
10600
First Reading For Entire File .......... 9671
Last Reading For Entire File ........... 10670
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10601.0
ROP 10672.0
LOG HF~ADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12160.0
12230.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE ~gD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
01-DEC-97
ISC 5.07
MEMORY
12230.0
10670.0
12230.0
61.4
69.4
TOOL NUMBER
NGP SPC 317
8.500
8.5
LSND
10.30
56.0
9.0
2200
3.0
.000
.000
70.5
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA/~DOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 4 FT/H 4 1 68 4 2
GR MWD 4 AAPI 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10601 12230 11415.5 3259 10601
ROP 4.4768 205.078 39.508 3117 10672
GR 20.5602 320.424 131.901 3119 10601
Last
Reading
12230
12230
12160
First Reading For Entire File .......... 10601
Last Reading For Entire File ........... 12230
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
FCNT 11889.0
NCNT 11889.0
NPHI 11889 0
FET 11914 0
RPD 11914 0
RPM 11914 0
RPS 11914 0
RPX 11914 0
PEF 11923 5
DRHO 11923 5
RHOB 11923.5
GR 12160.5
ROP 12230.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAN~4A RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE ~qD CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
STOP DEPTH
12411.0
12411.0
12411.0
12437.0
12437.0
12437.0
12437.0
12437.0
12445.5
12445.5
12445.5
12456.5
12521.5
04-DEC-97
ISC 5.07
MEMORY
12523.0
12230.0
12523.0
67.4
71.7
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
~JD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
63.0
9.0
1800
2.8
.950
.453
.580
1.300
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD 5 FT/H 4 1 68
GR MWD 5 API 4 1 68
RPX MWD 5 OHM}4 4 1 68
RPS MWD 5 OHMS4 4 1 68
RPM MWD 5 OHMM 4 1 68
RPD MWD 5 OHMM 4 1 68
FET MWD 5 HOUR 4 1 68
NPHI MWD 5 P.U. 4 1 68
NCNT MWD 5 CNTS 4 1 68
FCNT MWD 5 CNTS 4 1 68
RHOB MWD 5 G/CC 4 1 68
PEF MWD 5 BARN 4 1 68
DRHO MWD 5 G/CC 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
75.5
Name Min Max Mean
DEPT 11889 12521.5 12205.2
ROP 2.412 458.789 20.0362
GR 14.9648 112.342 37.8016
RPX 4.5204 2000 270.031
RPS 4.5038 2000 495.662
RPM 3.9046 2000 791.37
RPD 7.5665 2000 947.318
Nsam
1266
583
593
1047
1047
1047
1047
First
Reading
11889
12230.5
12160.5
11914
11914
11914
11914
Last
Reading
12521.5
12521.5
12456.5
12437
12437
12437
12437
FET 7.3942 53.2939 34.6531 1047
NPHI 8.812 81.0455 19.9556 1045
NCNT 2096.22 4308.81 3506.9 1045
FCNT 408 1685.34 1065.24 1045
RHOB 1.1696 2.6926 2.14793 1045
PEF 0.1119 5.4418 1.77949 1045
DRHO -0.195 0.2734 0.0272139 1045
11914
11889
11889
11889
11923.5
11923.5
11923.5
12437
12411
12411
12411
12445.5
12445.5
12445.5
First Reading For Entire File .......... 11889
Last Reading For Entire File ........... 12521.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
FET
RPD
RPM
RPS
RPX
PEF
DRHO
RHOB
GR
ROP
$
6
.5000
START DEPTH
12412.0
12412 0
12412 0
12438 0
12438 0
12438 0
12438 0
12438 0
12447 0
12447 0
12447 0
12458 0
12525 0
STOP
1258
1258
1258
1258
1258
1258
1258
1258
1258
1258
1258
1258
1258
DEPTH
9.0
9O
90
85
85
85
85
85
90
9O
9O
85
85
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE \~RSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAM~J~ RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL ST;dqDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
06-DEC-97
ISC 5.07
MEMORY
12820.0
12523.0
12820.0
71.3
75.5
TOOL NUMBER
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
P0895CRLGM6
8.500
8.5
LSND
10.80
58.0
9.1
1600
2.8
.950
.446
.600
1.350
81.6
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD 6 FT/H 4 1 68
GR MWD 6 API 4 1 68
RPX MWD 6 OHMM 4 1 68
RPS MWD 6 OHMM 4 1 68
RPM MWD 6 OHMM 4 1 68
RPD MWD 6 OHMM 4 1 68
FET MWD 6 HOUR 4 1 68
NPHI MWD 6 P.U. 4 1 68
NCNT MWD 6 CNTS 4 1 68
FCNT MWD 6 CNTS 4 1 68
RHOB MWD 6 G/CC 4 1 68
PEF MWD 6 BARN 4 1 68
DRHO MWD 6 G/CC 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Min Max Mean Nsam
DEPT 12412 12589 12500.5 355
ROP 2.7039 455.273 28.1783 128
GR 14.3846 150.499 57.5866 262
RPX 13.0681 2000 273.821 302
RPS 14.2858 2000 402.803 302
RPM 13.8272 2000 826.739 302
RPD 14.4447 2000 1215.57 302
FET 5.1935 38.335 22.2575 302
NPHI 10.3009 45.9653 19.7907 355
NCNT 2630.5 4153.24 3540.34 355
FCNT 634.684 1384.81 963.407 355
RHOB 2.0721 2.5919 2.26171 285
PEF 0.1276 3.6306 0.954667 285
DRHO -0.095 0.2626 0.00613333 285
First
Reading
12412
12525
12458
12438
12438
12438
12438
12438
12412
12412
12412
12447
12447
12447
Last
Reading
12589
12588.5
12588.5
12588.5
12588.5
12588.5
12588.5
12588.5
12589
12589
12589
12589
12589
12589
First Reading For Entire File .......... 12412
Last Reading For Entire File ........... 12589
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 12589.0 12678.0
RPD 12589.0 12678.0
RPM 12589.0 12678.0
RPS 12589.0 12678.0
RPX 12589.0 12678.0
GR 12589.0 12671.0
ROP 12589.0 12724.5
$
LOG HEADER DATA
DATE LOGGED: 04-JAN-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT) : 12724.0
TOP LOG INTERVAL (FT) : 12589.0
BOTTOM LOG INTERVAL (FT): 12724.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 72.2
NLAXIMUM ANGLE: 72.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY P0871SP4
EWR4 ELECTROMAG. RESIS. 4 P0871SP4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 6.000
DRILLER'S CASING DEPTH (FT) : 6.0
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 10.50
MUD VISCOSITY (S) : 74.0
HUD PH: 9.4
MUD CHLORIDES (PPM) : 1400
FLUID LOSS (C3) : 5.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .470
MUD AT MAX CIRCULATING TERMPERATURE: .270 63.3
MUD FILTRATE AT MT: .320
MUD CAKE AT MT: .530
Dat
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL ST~4DOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
a Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order
Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68
GR MWD 11 API 4 1 68
RPX MWD 11 OHMM 4 1 68
RPS MWD 11 OHMM 4 1 68
RPM MWD 11 OHMM 4 1 68
RPD MWD 11 OHMM 4 1 68
ROP MWD 11 FT/H 4 1 68
FET MWD 11 HOUR 4 1 68
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name
DEPT
GR
RPX
RPS
RPM
RPD
ROP
FET
Min
12589
8 8638
20 9624
24 2728
32 7987
44 1305
1 2191
9 5551
Max Mean Nsam
12724.5 12656.8 272
153.121 22.8437 165
369.255 69.9965 179
624.803 89.3525 179
2000 152.209 179
2000 205.912 179
1109.18 28.9307 272
23.83 11.1232 179
First
Reading
12589
12589
12589
12589
12589
12589
12589
12589
Last
Reading
12724.5
12671
12678
12678
12678
12678
12724.5
12678
First Reading For Entire File .......... 12589
Last Reading For Entire File ........... 12724.5
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
File Header
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
GR 12671.5 12725.0
FET 12678.5 12732.0
RPD 12678.5 12732.0
RPM 12678.5 12732.0
RPS 12678.5 12732.0
RPX 12678.5 12732.0
ROP 12725.0 12779.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
05-JAN-98
ISC 5.07
MEMORY
12779.0
12724.0
12779.0
74.5
76.3
TOOL NUMBER
P0871SP4
P0871SP4
6.000
6.0
LSND
10.50
75.0
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
9.6
1400
4.4
.470
.239
.320
.530
.6
Name Service Order
Units Size Nsam
DEPT FT 4 1
GR MWD 12 AP1 4 1
RPX MWD 12 OHMM 4 1
RPS MWD 12 OHMM 4 1
RPM MWD 12 OHNR4 4 1
RPD MWD 12 OHMS4 4 1
ROP MWD 12 FT/H 4 1
FET MWD 12 HOUR 4 1
Rep Code Offset Channel
68 0 1
68 4 2
68 8 3
68 12 4
68 16 5
68 20 6
68 24 7
68 28 8
65.6
Name
DEPT
GR
RPX
RPS
RPM
RPD
ROP
FET
Mi
12671.
9 448
3 013
2 944
2 929
3 771
2 513
11 127
n Max Mean
5 12779 12725.2
2 88.0821 22.5568
9 25.2357 10.4309
5 28.0599 11.2962
5 55.3894 13.6361
6 73.0689 17.1774
9 267.69 22.5034
7 27.8311 24.1314
First Last
Nsam Reading Reading
216 12671.5 12779
108 12671.5 12725
108 12678.5 12732
108 12678.5 12732
108 12678.5 12732
108 12678.5 12732
109 12725 12779
108 12678.5 12732
First Reading For Entire File .......... 12671.5
Last Reading For Entire File ........... 12779
File Trailer
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.010
Physical EOF
File Header
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.009
Comment Record
FILE HEADER
FILE NUMBER: 10
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12725.5 14014.5
FET 12732.5 14021.5
RPD 12732.5 14021.5
RPM 12732.5 14021.5
RPS 12732.5 14021.5
RPX 12732.5 14021.5
ROP 12780.5 14075.0
$
LOG HEADER DATA
DATE LOGGED: 09-JA/~-98
SOFTWARE
SURFACE SOFTWARE VERSION: ISC 5.07
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 14075.0
TOP LOG INTERVAL (FT) : 12779.0
BOTTOM LOG INTERVAL (FT) : 14075.0
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 76.4
M3kXIMUM ANGLE: 82.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY P0871SP4
EWR4 ELECTROMAG. RESIS. 4 P0871SP4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MI]D DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
6.000
6.0
LSND
10.50
69.0
9.6
1200
2.6
.500
.254
.420
.900
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 13 API 4 1 68 4 2
RPX MWD 13 OHMM 4 1 68 8 3
RPS MWD 13 OHMM 4 1 68 12 4
RPM MWD 13 OHMM 4 1 68 16 5
RPD MWD 13 OHMM 4 1 68 20 6
ROP MWD 13 FT/H 4 1 68 24 7
FET MWD 13 HOUR 4 1 68 28 8
82.2
First
Name Min Max Mean Nsam Reading
DEPT 12725.5 14075 13400.2 2700 12725.5
GR 5.5537 251.274 103.821 2579 12725.5
RPX 6.0026 2000 63.0429 2579 12732.5
RPS 7.5333 2000 88.7982 2579 12732.5
RPM 7.7617 2000 142.369 2579 12732.5
Last
Reading
14075
14014.5
14021.5
14021.5
14021.5
RPD 9.5082 2000 178.372 2579
ROP 3.3122 261.663 47.577 2590
FET 0.7677 27.1947 3.57727 2579
12732.5
12780.5
12732.5
14021.5
14075
14021.5
First Reading For Entire File .......... 12725.5
Last Reading For Entire File ........... 14075
File Trailer
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/02/19
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.011
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/02/19
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/02/19
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File