Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-155 ALASKA OIL AND GAS CONSERYA~ION CO~SSIO~V TONY KNOWLES, GOVERNOR 333 W. 7~ AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Fritz Gunkel, Manager Drilling BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519 Re: Cancelled or Expired PTD's. Dear Gunkel: September 6, 2001 The Alaska Oil and Gas Conservation Commission ("AOGCC") approved the following referenced permit to drills. The AOGCC has a long-standing policy of releasing cancelled or expired permits two years from the date the application was approved by the AOGCC. The following files are scheduled to be released October 1,2001. Permit to Drill No.'s: -97-047 98-019 99-002 97-056 98-050 99-009 97-082 98-135 97-090 98-154 97-100 98-155 97-121 98-164 97-159 98-167 97-191 98-177 98-210 98-211 98-223 98-236 98-257 98-261 Sincerely, Memorandum State of Alaska Oil and Gas Conservation Comm~ Well File: C~c~ _ (~ ~a.~ DATE Re: Cancelled or Expired Permit Action EXAMPLE: Point Mclntyre P2-36AXX AP1 # 029-22801-95 3l, tqct This memo will remain at the from of the subject well fie. Our adopted conventions for assigning AP! numbers, permit numbers and well names did not specifically address expired or cancelled permits. This omission has caused some inconsistencies i' the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt formal procedures for this class of permit application in order to prevent future database disparities. If a permit expires or is cancelled by an operator, the permit number of the subject permit will remair. unchanged. The APl number and in some instances the well name reflect the number of preexistin,( reddils and or muitilaterais in a well. In order to prevent confusing a cancelled or expired permit ~ an active well or multilateral these case sensitive well identifiers will be changed for expired and cancelled applications for permits to ddil. The AP! number for this cancelled or expired permit is modified so the eleven and twelfth digits is 9[ The well name for a cancelled or expired permit is modified with an appended xx. These procedures are an addendum to the APl numbering methods described in AOGCC staff memorandum "Multi-lateral (weilbore segment) Drilling Permit Procedures, revised December 29, 1995. AOGCC database has been changed to reflect these changes to this permit. e MCMains ' ~ Statistical Technician ,.~hared BP Exploration / Arco Alaska Date: October 9, 1998 To: At'tn: From: Alaska Oil & Gas Conservation Commission Mr. Jack Hartz Carol Withey ~ j~~---" Technical As~i~It~t III Shared Servic'e~s Drilling Jack: Per our phone discussion on Monday, October 5, I have attached the revised permit for B1-25L2. The following is a recap of our conversation. B1-25, B1-25L1, and B1-25L2 originally permitted and approved by AOGCC is no longer a multi-lateral well. We plan a single penetration utilizing the B1-25L2 surface, productive interval and bottom hole location coordinates. Drilling operations have been modified accordingly and are attached. We anticipate no changes in the drilling fluid program. We have not begun drilling operations and plan to move to the site within the next 7 days. Additionally, you asked I make the following request: Please contact Michael Cook, the operational drilling engineer at 564-5390 or myself at 564-4114 if you have further questions. Cc: B1-25 Well File Attachments -Revised Permit -Operations Summary -Revised Directional -Well Plan Summary TONY KNOWLE$, GOVERNOFI ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 August 26, 1998 Dan Stoltz Drilling Superintendent BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re' Badami Unit B 1-25L2 BP Exploration (Alaska) Inc. Permit No. 98-155 Sur. Loc.: 3857~1SL, 17"WEL, Sec. 8, T9N, R20E. UM Btmhole Loc: 5 I'SNL, 598"WEL, Sec. 9, T9N, R20E, UM Dear Mr. Stoltz: '- Enclosed is the approved application for permit to drill the above referenced well. Thc permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize condUcting drilling operations until all other required permitting determinations are made. The permit is for a new wellbore segment of existing well B 1-25, Permit No. 98-153, API 50-029-22906. Production should continue to be reported as a function of the original API number stated above. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. -. Chairman BY ORDER OF THE COMMISSION dlEenclosures cc: Department of Fish & Game. Habitat Section wio encl. Department of Environmental Conservation w/o encl. .,-",.. STATE OF ALASKA ~ ALASKA',.,.~_ AND GAS CONSERVATION CON .... JSSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work l~ Drill [-IRedrill Ilb. Typeofwell [-I Exploratory [-1StratigraphicTest C~ Development Oil [] Re-Entry [] DeepenI []Service [] Development Gas [] Sin~lle Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE -- 54.8' Badami 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365533~' 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3857' NSL, 17' WEL, SEC. 8, TgN, R20E, UM Badami Unit At top of productive interval 8. Well Number Number 2S100302630-277 94' SNL, 743' WEL, SEC. 9, TgN, R20E, UM B1-25L2 At total depth 9. Approximate spud date Amount $200,000.00 51' SNL, 598' WEL, SEC. 9, TgN, R20E, UM 09/10/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL367011 by 4682'I None 5120 12191' MD / 10504' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 11100' MD Maximum Hole Angle 51 ° Maximum surface 4400 psig, At total depth (TVD) 10094' / 6326 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 BTC 300' 12232' 10249' 12532' 10454' LJncemented slotted liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length MD TVD Structural Conductor Surface Intermediate Production C~ RECE Liner IVED ADC: 1998 Perforation depth: measured ORIGINAL AI~$R~ Oil & ~ ~. ~ommi~ion true vertical ~ Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mike Miller, 564-5066 Prepared By Name/Number: Carol Withey, 564-4114 21. I hereby certify that th,~/foregoing is/true and correct to the best of my knowledge Signed Dan S,o Drilling Superintendent Date ~'"7 [,/..~). $-f~ I~ f'g-Commis 'v/ Co mission Use Only Permit Number ! APl Number I ApprovalDate I See cover letter C~ (~.- J,~",r' 5o- o,2q- o~ ~ c~ 0~ -~ I ~-~::~.~-~ for other requirements Conditions of Approval: Samples Required []Yes [~No Mud Log Required []Yes ~rNo Hydrogen Sulfide Measures []Yes ,[~'No Directional Survey Required J~Yes []No Required Working Pressure for BOPE []2M; E]3M; l~5M; I--I10M; E]15M Other: dqg~na.! Signed By by order of Approved By David W. Jehnsf.-..-. Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate B 1-25 Producer- Multi-lateral PERMIT B1-25 L2 - HOLE #2 - second penetration below 7" intermediate casing: I T nO: I sa2 I I T TWa"V: 1 04S4 I Badami Sand F5 Primary target Bottom Hole Location ('rD) 94'FNL 743' FEL SEC 9, T9N, R20E, UM, AK 51' FNL 598' FEL SEC 9, T9N, R20E, UM AK Formation Markers: Formation Tops MD TVD (bkb) Remarks Shallowest Badami Sand 10590 9154 Badami Sand F3 11827 9973 Badami Sand F4 12016 10102 Badami Sand F5 12212 10236 Primary Sand Badami Sand A5 12325 10313 Total Depth 12532 10454 Casing/Tubing Program: Hole §ize Cs'g/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. . MD/TVD MD/TVD brt 6" 4-1/2" 12.6# L-80 BTC 300 12232/10249 12532/10454 slotted liner NOTE: slotted liner will only be installed if sufficient amalgamated pay exists as determined by logs and petrophysicist. Length of slotted liner will be adjusted to cover an interval from TD to above top of amalgamated pay. If insufficient amalgamated continuous pay exists to warrant the slotted liner, none will be run. Logging Program: Production Hole MWD GR/Resistivity only Cased Hole Logs: RFT none none Directional: KOP: I11,100'md/9480' tvd @ 51 deg. Maximum Hole Angle: 151 deg. @ KOP Close Approach Well: I none RECEIVED AUG 4 1998 Alaska Oil & (~as Cons. Commission Anchorage Shared Services Drilling Contact: I Well Name: B 1-25 Producer- Multi-lateral PERMIT Mike Miller 564-5066 I B1-25 Badami J Well Plan Summary DATA COMMON TO ALL THREE PENETRATIONS (PRIMARY AND BOTH LATERALS): Type of Well (producer or injector): Producer- Multi-Lateral Open-Hole Surface Location: 1 3857' FSL 17' FEL SEC 8, T9N, R20E, UM, AK J AFE Number: J 8804 0 JKI E: J54.8 J 28E I.Estimated Start Date: I Sept. 10 1998 I I Operat,ing days to complete: 145 Well Design: I Ultra slimhole- multi-lateral open hole completion w/slotted liner Formation Tops MD TVD (bkb) Remarks base permafrost 2005 2004 TOp Middle Brookian (TMBK) 7619 7132 M90 9228 8184 Base West Sak (M85) 9655 8474 Casing/Tub lng Program: Hole ~ize ' Csg'/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. . MD/TVD MD/TVD brt 24" 20" 91.1# H-40 Weld 80 37/37 116/116 12-1/4' 9-5/8" 40# L-80 BTC 4521 35/35 4556/4555 8-1/2" 7" 29# P110 BTC- 10428 33/33 10461/9054 mod ,, IInternal yield of the 7" 29#/ft P110 is 11 which is than the pressure casing 220, psi, greater maximum anticipated surface ,p, ressure of 4400 psi (6326 psi at 10094 tvd; gas, 0.1 psi/E, surfac~'~~ 0.36 psi/ft, 6570 to 10094 tvd). Wellhead rating is 5000 psi for starting head (intermediate casing) and 10,000 psi for tubing head (10,000 psi is required not for drilling, but for injection, during which surface pressures will reach 5500 psi). BOPE is 10000 psi to match the wellhead rating and to allow for any remote chance that a higher pressure sand is encountered that would exceed 5000 psi shut-in surface pressures. Logging Program: Surface Sidewall cores · 30ea. planned ( 2500' md - 4500'md) Intermediate MWD/GR @ hole section TD Mud Program: Special design considerations B 1-25 Producer- Multi-lateral PERMIT displace OH laterals to 5% KCL water based muds Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 150 25 20 45 9 10 to to to to to to to 9.8 - 10.0 300 60 30 60 9.5 ~5 intermediate Mud Properties: I KCL polymer Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2 45 15 8 15 8.5 6-8 to to to to to to to 10.1 55 20 10 25 9.5 4-6 Production Mud Properties: I KCL polymer Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel ~lel Loss 12.0 45 10 8 15 8.5 4-5 to to to to to to to 12.4 55 15 10 20 9.5 4-5 Well Control (Secondary) - Diverter Waiver Requested Well control equipment consisting of 10,000 psi W.P.(2) pipe rams, (1) blind rams, and 5M WP annular preventer will be installed and is capable of handling maximum potential surface pressures.10 M WP Choke & kill manifold. BOPE and drilling fluid system schematics on file. r Waste Manac~ement: Cuttings Handling: the cuttings will be processed through the onsite Grind and Inject facility and injected into disposal well B1-01. Surface gravels will be washed and stored for construction purposes. Fluid Handling: All drilling and completion fluids will be processed through the onsite Grind and Inject facility and injected into disposal well B1-01. Annular Injection: No annular injection is planned at this time. DRILLING HAZARDS AND RISKS: Wellbore proximity comments are addressed under each MLOH section. Junk (auger tooth) was encountered in the B1-16 conductor - if junk is encountered, ensure all junk is fished prior to commencing drilling. Stuck pipe - UGNU sands, West Sak Sands - differential Coals - stringers throughout well, 4500' to Canning formations at 9500' tvd. Badami sands are overpressured - normally 12.2ppg mw required at TD. Pressure transition begins just above shallowest sand. Shallow sands typically pressured between normal and the 12.2 ppg required in lower sands. Maintain minimum mud weight and utilize latest techniques to manage lost circulation hazards in shallow sands (flow rates, tapered drill string). Weight up as wellbore pressures dictate, maintaining a 200 psi overbalance throughout. /,~.. B 1-25 Producer - Multi-lateral PERMIT Hazards of well control and stuck pipe are managed by setting 7" casing above shallowest sand, before penetrating the full overpressure. Hazard of lost circulation is managed by proper techniques to maintain Iow ECD - ECD of 13.5 ppg noted to be maximum allowable to prevent lost circulation. snarea ;ervtces Drttttng DrillQ ~le: linch = ~ Eastings .3~0 3600 4~0 44~ 4~00 1800- - 1800 4 1/2" Liner- 12532.~ MD, D ' To~I ~p~: 12532.~ ~.~~ fl [ II I I I I I 3~0 ~ ~00 ~00 4800 ~le: linch = ~ Eastings Referenoe I~ True No~h  7" Casing - 10461.22 MD, 90~.80 ~D · .  Proposal Target Summa~ ..................... ~ ~ ~ , "SURFACE LOCATION-- PLOT DAT'E-~-'"~/3-07~'' 10400 -- !0313~D~329~,4548.78~ Tnfnl ~. 12~2 ~ Mn ~oooo - 800 1200 16~ ~0 we~c~ ~ect!on , Sperry-Sun Drilling Services Proposal Report for BI-25 Wp4 L1 ONLY Badami Measured Depth · ~;: 3o.3C 11204 113oo.00. 11400.00 11500.00 11600.0o 11700.00 11800.00 11827,16 11900.00 12000.00 12016.25 12100.00 12200.00 12212.67 12300.0o 12325.54 12400.00 125O0.00 12532.22 Incl. 61.261 ~7.162 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 46.983 · 46.983 46.~ 46.~ 46.01~ 53.867 72.952 73.419 73.419 73.419 73.419 73A19 73.419 73.419 73.419 73A19 73.419 73.419 73.419 73.419 73.419 73.419 73.419 73A19 73.419 73.419 Sub-Sea Depth (ft) 9a25.76 . 9491 15' 9494.43 9559.36 9627.59 9695.81 9764.03 9832.25 9900.47 9919.00 9968.69 10036.91 10048.00 10105.13 10173.35 10182,0O 10241.58 10259.00 10309.80 10378.02' 10400.00 Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 9490.56 9545.95 9549.23 9614.16 9682.39 9750.61 9818.83 9887.05 9955.27 9973.80 10023.49 .10091.71 10102.80 10159.93 10228.15 10236.80 10296.38 10313.80 10364.60 10432.82 !0~6.8a N 1094.82 N 1095.84N 1115.70 N 1136.56 N 1157.43 N 1178.29 N 1199.16 N 1220.02 N 1225.69 N 1240.89 N 1261.75 N . 1265.15 N 1282.62 N 1303.49 N 1306.13 N 1324.35 N 1329.68N 1345.22N 1366.08 N 1372.81N 3689 88 E 3750.06 E 3763.44 E 3830.13 E 3900.21E · 3970.28 E 4040,36 E 4110:43 E 4180.51 E, 4199.54 E 4250.58 E 4320.66 E ' , 4332.05 E 4390.73 E 4460.81 E, 4469.69 E 4530.88E A548.78 E'. 4600.~E 4671.03 E ~693.61E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) ('/looft) (ft) 5907425 !3 N ?7703 91 E !000.41 5907461.83 N 5907452.79 N 5907471.45 N 5907491.06 N 5907510.66 N 5907530.26 N 5907549.87 N 5907569.47 N 5907574.80 N ' 5907589.08 N 5907608.68 N ', 5907611.87 N 5907628.28 N 5907647.89 N 5907650.37 N 5907667.49 N 5907672.50 N ., ' 5907687.10 N 5907706.70 N ,~907713.02 N 387?~4.59 E 8.000 1027 ! 1 367777.98 E 8.000 1028.07 367845.03 E 0.000 1046.73 367915.46 E 0.000 1066.34 367985.90 E 0.000 1085.94 368056.34 E 0.000 1105.54 368126.78 E 0.000 1125.15 368197.22 E 0.000 1144.75 368216.35 E 0.000 1150.08 368267.66 E 0.000 1164.36 368338.09 E 0.000 1183.96 368349.54 E 0.000 1187.15 368408.53 E 0.000 ' 1203.56 368478.97 E 0.000 1223.17 368487.90 E 0.0O0 1225.65 368549.41 E 0.000 1242.77 _.368567,40 E , , 0_.0,00 1247.78 368619!85 E 0.0O0 1262.37 368690.29 E 0.000 1281.98 · · 368712.98 E 0.000 . 1288.29 Alaska State Plane Zone 3 Badami CPF Comment '-ie-on. Start Dir @ 8.000°/100ft · ! 1100.00ff MD. 9480.56ff TVD ~'~,,I)'/( '2.¢~" ¢;cZ, ~' _. End Dir, Sail @ 46.983° ' 11204.82ft MD, 9549.23ft TVD F3 F4 F5 iarg~t: Bi-25 L1 7i, 200.00Radius.. 8riiiers Total Deoth · ! 2532.22ft MD, 10454,80ft 'I'VD 4 1/2" Liner / "30June, 1998 - 11:05 -1- DrfliQuest Sperry-Sun Drilling Services Proposal Report for B1-25 Wp4 L 1 FOP-, PERMITTING ONLY Badarni Alaska State Plane Zone 3 Badami CPF All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference .~ Northings and Eastings are relative to Well Reference. ....... The Dogleg Severity is in Degrees per !00ft. (. ,,"er;;cai Sec;ion :is from Well Reference a~';C calculated along an Azimuth of 358.971 ° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12532.22ft., The Bottom Hole Displacement is 4890.26ft., in the Direction of 73.697° (True). -2. DrillCkJest · . '-'30 June, f998- t1:05 ,. · ~UG-03-98 HON 08:54 SPERRY-SUN RLRSKR ?'R,~ NU, ]WU/bUlb/bq t", Ud Shared Services Drilling Mike Cook Mike, The above mentioned well h~s been scanned using standard anti-collision methods via DF. AP. The sc,'u-t was performed with the following pas-arnete~s: Start Scan Impection Zone End Scan Inspection Zone Starting Scan l~diu~ Rate o£ Radius Incresse (per 1000') 5631 Silverado Way #G Anchorage, Alaska 99518 (907) 563-3256 Fax (907) 563-7252 Approved Well Close Approach Review Badami / B1-28 Wp4 35.30' 14,329.42' 100.00° Anti-Collision Sc,~n smnmary: At the planned KOP the Starting Scan Radius is 98.235' larger than DEAFs default settings of 100' Start Scan Radius increasing at 50' l~r 1000 'MD tot a new-drill well scan, thus DEAP's defaults would be equal to 101.765' at the Stazi Scan Inspection Zone a~ stated above. These number~ are used to produce a final scan radius of 1629.412' which is 812.941' larger than DEAP's defmlt value of 816.471' Scan Parameters Comments: i. _ At ~is enlarged radiu~ th~ following wells w, rc detected during the scan (Ba.~d on clc~s~t 'Allowable Dcviaiion from Plan): Note: this list may not include all tho wells detected, only those of which Re of concern or ma~, effect Tolerance Line &awing[ .Cpmpartson Sublect Well Plann~ Well Relative ~,Howablq Shut-lrtRequired? (Semration not~ W~II: Depth Severatton Azimuth Devlafloq (~ Ext~tln~ Su~ ('-- W¢~ ~lan MD} (Potnt lo Potty) (TC Dirtctlon) (Awrox. ~L DI~0 $~tus B1-01 598.63 'MD 240.45 ' 265.80 ° 234.92 ' No ,, , BI-II 400.45'MD 140.43 ' 268.00 ° 136.~4 ' No ,, Bl-14 400.30'MD 110.78 -' - 269.20 ° 106.87 ' 'No Bl-14 4691.88'MD 166.48 ' 317.70 ° 127.38 ' bio BI-15L1 499.73'MD 100.81 ' 266.50 ° 96.18 ' No BI-15LI 5197.12'MD 124.83 ' 264.10" 83.99 ' No BI-16PB1 400.25'MD 92.75 ' 269.50 ° 88.15 ' No BI-16PB1 2570.34 'MD 30.07 ' 292.90 ° 13.32 ' No Bl-18 599.79'MD 69.95 ' 266.60 ° 64.53 ' No Bl-18 5480.20'MD 145.95 ' 214.90 ° 107.60 ' No ' ;,~B1-21 200.10'MD 40.17 ' 270.20 ° 38.54 ' No B1-21 3163.86 'MD 94.35 ' 126.20 ° 74.98 ' No B 1-28 599.64 'MD 30.23 ' 104.90 ° 25.43 ' No B1.28 2693.29'MD 128.24 ' 143.I0 ° 112.34 ' No ! i I i I · I1 I Tolerance Plot required: Yes MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR Close Approach Comments: We have a very close approach with Bl-16 at the 2400 - 3000 MD areo, I will talk fo our drillers before they go up and have them nudge away fro.m' that area slightly to avoid any Interference yet s. tlll remain on our .nudge proCJram. Close Approach Scan Performed by: Date: Checked by: Date: Approved by: _ Date: II · Shared Services Approval: · · Date: · i B1-25.xis _ AWD Proximity Review 8/3/98 H 140314 VEN~R At.ASKAST14 OC DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 0709c~8 CKO7OC~8B 100. O0 100. O0 HANDLING INST' s/h caeol withey x 4114 mE AWAC~O CNECK ~ IN PAY~ ~ ~ ~RI.~ A~. ~ 1 OO, O~ 100 OO · WELL PERMIT FIELD & POOL CHECKLIST COMPANY r'~ INIT CLASS WELL NAME ,~a,J,~,~ ¢~;'/ ~ 'J' -0?.,Y~ ~ PROGRAM: exp [] dev/~ redrll [] serv [] wellbore seg [] ann. disposal para req ; [ GEOL AREA ~ c~ "~ UNIT# ! 0 .~. (') c~ ON/OFF SHORE ADMINISTRATION . 2. 3. 4. 5. . 7. 8. 9. 10. 11. 12. /~R (.~,~TR~Eo~~ 13. ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. APE'R-.- DATE 26. 28. 29. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... Conductor string provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg ........ CMT will cover all known productive horizons .......... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved. Adequate wellbore separation proposed ............. If diverter required, does it meet regulations .......... Drilling fluid program schematic & equip list adequate. .... BOPEs, do they meet regulation ................ BOPE press rating appropriate; test to .,~OO-(::~ psig. Choke manifold complies w/APl RP-53 (May 84) ........ Work will occur without operation shutdown ........... Is presence of H2S gas probable ................. GEOLOGY /~R DAT'E _ ANNULAR DISPOSAL APPR DATE N 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N 31. Data presented on potential overpressure zones . . ~ 32. Seismic analysis of shallow gas zones~ .... Y N 33. Seabed conditionsu~ ............ Y N ory only] N N N ~N 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; _~ . . . (B) will not contaminate freshwater; or cause~ waste... to surface; ~ (C) will not impair mechani~grity of the well used for disposal; (D) will not damage pr..edl~ing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N Y N Y N Y N GEO_LT~G..GY: ENGIN.EE_RING: UIC/Annular COMMISSION: BE~~I~/'~WM NC, 8/5-/~j~3 DWJ ~ /~ JDH ~' RNC_ co Comments/Instructions: M:cheklist rev 05/29/98 dlf: C:\msoffice\wordian\diana\checklist