Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout188-131 Ima ect Well History File' Cover( e
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
RESCAN DIGITAL DATA OVERSIZED (Scannable)
[3 Color items: [] Diskettes, No. [] Maps:
[] Grayscale items: [] Other, No/Type [] Other items scannable by
large scanner
[] Poor Quality Originals: '~' '""~"'"'"'"'~'Non-Scannable)
[] Oth er: ,
NOTES: Logs of various kinds
[] Other
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS/
Project Proofing
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELl. DATE: Isl
Scanning Preparation
j~ x 30 = ¢~' + ~.,/
= TOTAL PAGES
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /SI
/!!
Production Scanning
Stagel PAGE COUNT FROM SCANNED FILE:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: YES
BY'. BEVERLY BR~HERYL MARIA LOWELL DATE~--"'",~.O..~,
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: IS/
(S~N~G ~ COMPLETE AT THIS ~ UN~ SPEC~L A~ENT~N IS REQUIRED ON ~ ~D~UAL PAGE BAS~
DUE TO QU~, G~YS~
NO
NO
ReScanned (individual page [special attention] scanning completed)
RESCANNEDBY~BREN VINCENT SHERYL MARIA LOWELL
General Notes or Comments about this file:
Quality Checked (done)
10/25/02Rev3NOTScanned.wpd
UNSCANNED, OVERSIZED MATERIALS
AVAILABLE:
~~~ FILE #
_1 ~ iS
~~ (~~'~ ~J ~ ~
To request any/all of the above information, please contact:
Alaska Oil & Gas Conservation Commission ~ 333 W. 7th Ave., Ste. 100
Anchorage, Alaska 99501
Voice (907) 279-1433 Fax (907) 276-7542
„ STATE OF ALASKA
y~~~~ ALASKA~ AND GAS CONSERVATION COM~ION
~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG
/~~
1 a. Well Status: ^ Oil ^ Gas ^ Plugged ~ Abandoned ~^ Suspended
Zawc zs.~os Zawc ss.~,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Weil Class:
~ Development ^ Exploratory
^ Service ^ Strati raphic
2. Operator Name:
BP E~cploration (Alaska) Inc. 5. Date Comp., Susp., or Aban .
11/13/2008 12. Permit to Drill Number
188-131 ~ 308-320
3. Address:
P.O. Box 196612, Anchora e, Alaska 99519-6812 6. Date Spudded
10/31l1988 13. API Number
50-029-21883-00-00~
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
11/24/1988 14. Well Name and Number:
PBU Y-25.
1403
FNL, 169
FEL, SEC. 33, T11 N, R13E, UM
Top of Productive Horizon:
819' FSL, 4813' FEL, SEC. 28, T11 N, R13E, UM
8• KB (ft above MSL): 78.7' ~
Ground (ft MSL): 49.71'
15. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
1295' FSL, 1891' FEL, SEC. 29, T11N, R13E, UM 9. Plug Back Depth (MD+TVD)
13310' 9007' Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
SurFace: x- 644647 y- 5948850 Zone- ASP4 10. Total Depth (MD+TVD)
~~~$' - ~~' 16. Property Designation:
ADL 028288'
TPI: x- 639957 y_ 5950983 Zone- ASP4
Total Depth: x- 637590 y- 5951415 Zone- ASP4 11. SSSV De~A(MD+ND) 17. Land Use Permit:
18. Directional Survey ^ Yes ~ No
' r ni n ' in rm i n 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): >.
GR/RES/DEN-NEU
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH ND f jQ~E ~ v l J AMOUNT
Wr. PeR Fr. Gwwe TOP BOTfOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
" n r 1' ~
N 1 N
„ NT ~ , ~ _ „ ~
" 1 # ~ ~ , ~ 1 " 441 I
23. Open to production or inject ion? ^ Yes ~ No 24. Tus~NC RecoRo
If Yes, list each i
(MD+~/D of To
8 Bottom; Pe nterval open
rforation Size and Number): SIZE ~EPTH .SET MD PACKER .SET MD
p ~-~ r~°, ~ ~#, ~-80 ~ o~~ o~ ~ o22a~
MD ND MD TVD
Z~J. ACID, FRACTURE, CEMENT SpUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
.~~ ;~, ~~~, ~ ~ , , ~ t, r'~~ ~ G~ ~ ~ 11550' Set Cement Retainer
r`' ~`! ~''~ ~` 11354' PB~A w/ 257 Bbls Cement
11305' Set Whipstock
11305' Downsqueeze (below TOWS), 15 Bbls Cement
ZB. PRODUCTION TEST
Date First Production:
Not on Praduction Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: PROOUCnoN FoR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Cn~cuu~re~
24-HouR RnTe• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API ~CORR~:
Z7. CORE DA7A Conventional Core(s Acquired? ^ Yes ~ No Sidewal l Core s A uired? Yes ~ No
If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.,071.
t .lll1C 6
- ;
None ///,~~08 '
~~~~
Form 10-407 Revised 02/2007
CONTINUED ON REVERSE SIDE
- ~~..~ .~
~~,~`~~ ~~~ ~~F~` ~ ~ ?~?J~ ~~~~~~ ~
28. GEOLJGIC MARKERS ~LIST ALL FORMATIONS ANO RS ENCOUNTERED~: 29. FORMATION TESTS
NAME M ND Wel! Tested? ^ Yes ~ No
Permafrost Top If yes, list interoals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafro3t Base detailed test information per 20 AAC 25.071.
Sag River 10979' None
Shublik A 11022'
Sadlerochit / Zone 4 11252'
Formation at Total Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, WeU Schematic Diagram
31. I hereby certify that the foreg ing is true and correct to the best of my knowledge.
'~~
•
Signed Terrie Hubble
Title Drilling Technologist Date
~ Z"/~
PBU Y-25 188-131 308-320 Prepa~ed ey Namenuumber. Teme Hubble, 564-4628
Well Number i N A ~ DrillingEngineer: MaryEndacott 564-4388
INSTRUCTIONS
GeNewu.: This form is designed for submitting a complete and correct well completion report and log on all rypes of lands and leases in Alaska. Submit a well
schematic diagram with each 10-407 well completion repoR and 10-404 well sundry report when ihe downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Sak Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITeM 73: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true veRical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28.
I~~r 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production ftom more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separatety produced, showing
the data peRinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory infonnation required by 20 AAC 25.07L
ITe~w 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.07L
Form 10-407 Revised 02/2007 Submit Original Oniy
•
•
Y-25, Well History (Pre Rig Sidetrack)
Date Summary
8/16/2008 T/I/0= SSV/230/120. Temp= SI. OA FL (pre-MITOA). AL shut-in C~ casing valve w/ 0 psi. OA FL near
surface.
8/18/2008 T/I/0= 400/260/80 Temp= S/I MIT OA FAILED to 2000 psi. (PRE CTD SCREENING) Pumped 30 bbis
crude ~total) to establish LLR = 2 bpm @ 1200 psi for a steady 22 bbls without change. Bled back 1 bbl
crude. Final WHP's= 400/260/240. Operator notified of valves Swab = closed, Wing - closed, SSV =
closed, Master = open, IA & OA open to gauges on departure.
9/14/2008 WELL S/I ON ARRIVAL. PULLED 5-1/2" PX PLUG FROM 10147' MD. WELL LEFT S/I, NOTIFIED DSO.
9/15/2008 Rig up, perform BOP test. RIH w/ Baker left handed motor & 4.55" parabolic mill to mill XN C~ 10314'.
Drifted to 11600' with 4.55" mill. RIH w/ 4.13" cement retainer, set at 11550' correlated to X nipple depth.
POOH, Lay down setting tools.
9/16/2008 RIH with Baker stinger and sting in retainer, Inject 2.1 bpm at 2920 psi. Pumped 257 bbls cement.
unstung from retainer, picked up hole and got stuck at 11475' bottom perfs. Pumped 7/8" disconnect ball
and disconnected at 5500 psi, came free. ,POOH leaving centralizer 4.45" OD weight bar & cross over &
stinger, OAL of fish - 11.61', top of fish at 11481'. MU & RIH 4.55" OD Mill.
9/17/2008
9/18/2008
9/28/2008
10/25/2008
10/26/2008
10/29/2008
11 /1 /2008
11 /11 /2008
Continue RIH with 4.55" mill to 11430'. POOH, lay down milling assembly and MU dummy whipstock.
Drift with 3.625" OD x 19.33' Baker dummv whipstock assembiv. Drift cleanlv to a hard tap at 11354'
ctmd; unable to drift past. No weight bobbles encountered above 11354' ctmd. Confirm with ODE that
this depth is sufficient. Pull to surface and freeze protect wellbore to 2500' with 50/50 methanol/water.
RU for weekly BOP test.
Perform weekly BOP test. RDMO. Job Complete.
T/I/0=vac/0/250. Set 6" CIW J BPV. Pre Nordic 2.
T/IA/OA= SSV/0/200 Temp= cold PPPOT-T (PASS) PPPOT-IC (PASS) (Pre CTD)
PPPOT-T RU 1 HP BT onto THA test void, 200 psi to 0 psi, flushed void through SBS until clean returns
achieved. Pressure void to 5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bled void
to 0 psi. Did not cycle or torque LDS "Standard" all were in good visual condition. RD test equipment re-
installed Alemite cap.
PPPOT-IC RU 1 HP BT onto IC test void, 50 psi to 0 psi, flushed void through SBS until clean returns
achieved. Pressure void to 3500 psi for 30 minute test, 3450/ 15 minutes, 3450/ 30 minutes. Bleed
void to 0 psi. Did not cycle or torque LDS "Standard" all were in good visual condition. RD test
equipment re-installed Alemite cap.
Tree test pre CTD, Swab valve had a 200 psi loss in 5 min. going down, Master valve going down, swab
valve going up and wing valve going out, had a 250 psi loss in 5 min. Advised WSL of pressure test
results.
T/I/O = BPV/Vac/160. Temp = SI. Monitor WHP. No wellhouse, well demobed. IA & OA have
companion valves. Did not check SV or WV postioin due to no hand rails on tree platform.
SSV, MV = closed. IA, OA = OTG. NOVP.
T/I/0= 0/0/250; Set 2" VR Plug thru I/A Valve on left side of tree and installed 2-1/16" Valve on existing
Valve on right side of tree for Nordic 2. Complete.
T/I/O = Vac/0/0 Pulled 6-3/8 " CIW "J" BPV C~ 108". 4-5' ext. used for Nordic 2 to circulate.
Page 1 of 1
i~ • •
Legal Well Name: Y-25
Common Well Name: Y-25
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
_ ~ _ I I_:. i_ . I
11/11/2008 01:00 - 02:00 1.00 MOB P
02:00 - 02:15 025 MOB P
02:15 - 03:00 0.75 MOB P
03:00 - 03:30 0.50 MOB P
03:30 - 04:30 1.00 MOB P
04:30 - 07:00 2.50 MOB P
07:00 - 10:00 3.00 BOPSU P
10:00 - 15:00 5.00 BOPSU P
15:00 - 17:45 ~ 2.75 ~ BOPSUF~ P
17:45 - 18:15 0.50 RIGU P
18:15 - 20:45 2.50 RIGU P
20:45 - 22:05 1.33 RIGU P
22:05 - 22:50 0.75 BOPSU P
22:50 - 23:45 0.92 RIGU P
23:45 - 00:00 I 0.25 ~ STW HIP ~ P
11/12/2008 00:00 - 02:00 2.00 STWHIP P
02:00 - 02:30 0.50 STWHIP P
02:30 - 03:30 1.00 STWHIP P
03:30 - 06:00 2.50 STWHIP P
06:00 - 06:30 0.50 STWHIP N
06:30 - 09:30 3.00 STWHIP N
09:30 - 10:30 1.00 STWHIP N
10:30 - 13:30 I 3.001 STWHIP~N
13:30 - 15:00 1.50 STWHIP N
15:00 - 15:30 0.50 STWHIP N
15:30 - 17:40 2.17 ST'VNHIP N
17:40 - 19:15 1.58 STVIIHIP P
Spud Date: 10/29/1988
Start: 11 /11 /2008 End: 12/4/2008
Rig Release:
Rig Number:
NPT Phase Description of Opera~ions
PRE Continue to prep rig for move.
PRE PJSM - for pulling rig off of well Y-05B and moving down the
pad to Y-25
PRE Move rig from Y-05B to Y-25.
PRE PJSM for moving rig over Y-25
PRE Spot rig over Y-25
Rig accept at 0430 hrs
PRE Berm cellar. Spot external ta~ks and misc equipment.
Continue to prep replacement reel for use.
PRE Nu 7-1/16" BOPs.
RD, move, spot and RU flow back tank.
PRE Perform initial BOP test as per AOGCC regs, PTD 2081400,
and approved CTD plan.
Test witnessed by AOGCC inspector J. Crisp.
Test result data documented on AOGCC form and transmitted
via e-mail to the AOGCC office in Anchorage.
PRE Hold PJSM. RU DSM lubricator. PT to 1000 psi. Well on a
vac.
RD DSM lubricator.
PRE Crew change/safety mtg
PRE Install internal grapple into CT and PT. Pull CT to floor and
stab into injector. Replace packoff. Meg test line
PRE Rev fili CT w/ KCI 1.4/400, then pump slack back w/ second
circ
PRE Pressure test inner reel valve and packoff as part of BOP test.
Blow down kill line and CT
PRE RU hydraulic cutter and cut off 152' of CT (which is 1.04%
slack) leaving 14343' w/ 354k RF . Pump slack forward to
bung hole until wire exited
WEXIT MU CTC. PT 35k
WEXIT Head up BHI UQC. PT CTC ~ 4000 psi
WEXIT Pump slack forward 3.0/2250
Safery mtg re: MU BHA
WEXIT MU 5-1/2" WS + MWD ass
WEXIT RIH w/ BHA #1 circ KCI thru EDC 0.85/220 while take MeOH
returns to tiger tank. RIH to 10294' CTD
DFAL WEXIT Problems communicating with BHA. Trouble shoot from
surface. Suspect e-line has a problem.
DFAL WEXIT Pull out of hole. Hold BHA PJSM.
DFAL W EXIT Get off well. Unstab coil. E-line had pulled out of e-connector.
E-line end was just above coilconnector, but pulled out from
anchor.
DFAL WEXIT RU to pump slack and cut additional coil.
Cut 6' of coil. Found e-line.
RU and pump slack back again.
Cut 140' of additionai coil.
DFAL WEXIT Re-head e-coil. Electrical, pressure & pull tests good.
DFAL WEXIT Stab coil. Test MWD tools. Get on well.
DFAL WEXIT Run in hole with BTT 5-1/2" whi stock circ KCI thru EDC
0.6/100
WEXIT Log GR tie-in down from 10980'. Corr +2' to PDC log
Log CCL tie-in down from 10850' and find collars on depth to
~
~
BP EXPLORATION Page 2 of 19
Operations Summary Report
Legal Well Name: Y-25
Common Well Name: Y-25 Spud Date: 10/29/1988
Event Name: REENTER+COMPLETE Start: 11/11/2008 End: 12/4/2008
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
11/12/2008 17:40 - 19:15 1.58 STWHIP P WEXIT PDC log
19:15 - 19:30 0.25 STWHIP P WEXIT Park w/ BOWS at 11317' w/ TF 30L. 47.5k, 26k
Close EDC. Pressure up and tool stroked at 3200 psi while
setting WS. Stack 4k wob. PUH 46.3k PVT 228
Prelimina settin de ths TOWS 11 05' RA 11 14'
19:30 - 21:45 2.25 STWHIP P WEXIT POH w/ setting tool
21:45 - 23:10 1.42 STWHIP P WEXIT LD setting tool. LD MWD assy
Change out packoff
RU nozzle assy
MIRU SWS cementers
23:10 - 00:00 0.83 ZONISO P WEXIT RIH circ KCI thru nozzle 1.0/320
11/13/2008 00:00 - 01:15 125 ZONISO P WEXIT Finish RIH circ KCI thru nozzle 1.1/355 losing -0.1 bpm w/ 8.7
ECD
Safety mtg re: pump cement
01:15 - 01:30 025 ZONISO P WEXIT Ta at 11317' CTD corr to 11305'. PUH 50.5k w/ 3k OP IA
325
Park at 11285' while cementers finish batch up and circ biozan
to reel
01:30 - 02:10 0.67 ZONISO P WEXIT SWS pump 2 bbls FW to reel. PT 4000. SWS load CT w/ 15
bbls 15 8 ppq 'G' cement at 80F and 0.8/500 (had poor prime
Cement had 90 cc FL w/ 5:32 TT. IA 352
02:10 - 02:35 0.42 ZONISO P WEXIT Rig displace w/ 38 bbls biozan at 1.96/1.86/430 followed by 1%
KCI IA 410
02:35 - 02:50 0.25 ZONISO P WEXIT Red rate to 1.0/200 w/ cement at noz. POH 30'/min 552k from
11290' leavina cement in 5-1/2" liner to 10650'
02:50 - 03:35 0.75 ZONISO P WEXIT Park at 10382' safety and see 0.52/170 psi w/ full retums,
IA=350 psi
SI choke and pressure up wellbore system at 0.5 bpm w/ 5.0
bbls to 1000 psi whp and 1320 psi IAP in 10 minutes. SD
pump and monitor for 30 min w/ little bleed off after leaking
surface equipment was isolated
03:35 - 04:30 0.92 ZONISO P WEXIT Bleed off wellbore ressure while RIH and dilute cement w/
i z 1.0/320 at 40'/min. Tag WS. PUH to 10600'. RIH
jetting 2.73/1900 to WS
04:30 - 05:30 1.00 ZONISO P WEXIT POOH 'ettin cement to surface 2.65/2000 and et a fair
amount f as back from IA. Take all retums to tiger tank while
removing KCI from pits and replacing w/ biozan down the CT.
Swap to cuttings box w/ cement at surface
05:30 - 07:00 1.50 ZONISO P WEXIT Slow down pulling speed while investigate elastomers missing
from injector
07:00 - 08:15 1.25 ZONISO P WEXIT At surface. Get off well. Change nozzle to swizzle stick.
Jet out BOPs.
08:15 - 09:45 1.50 STWHIP N RREP WEXIT Inspect chains. Replace deformed elastomers behind 17
gripper blocks.
09:45 - 10:45 1.00 STWHIP P WEXIT Hold PJSM. MU 4.55" one step HCC window mill with 4.55"
diamond strin reamer on 2-7/8 motor.
5 P WEXIT Run in hole. Tag something at 10,346' (probably nipple).
~
p~ . . . PU and ream through same.
y-~~ + Tag up in liner at 10,988'.
1840 psi fs at 2.54 bpm iNout.
Mill throu h erfs/cmt from 10,988' to 11023'.
16:00 - 16:30 0.50 STWHIP P WEXIT Log GR tie in from 10,980'. Subtract 2' correction.
16:30 - 18:30 2.00 STWHIP P WEXIT Tag pinch point at 11,306.5'.
~ TREE _ ,, 6" CNV
WELLHEAD = MCEVOY
A2;TUATOR= BAKER
K6. ELEV - 78.71'
BF. ELEV - 51.21`
KOP = 3300'
Max Angle = 92 @ 11700'
Datum MD = 11000'
Datum ND = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347"
~ -
~TD ~it~~~t°r~Gk
~
'~~
Minimum ID = 2.3~"
AI sleeve in SELRT 1Q320'
Fdole in tubinr abc~ve GL'~9 ~`1 E~C3S ca[iper 2,'25/Q8 10Q78`
3-1;2" TIEB, ~J.2#, STL, 13Cr ID=2.992" ~'~ 10312"
5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" ~-j 107'I0,
TNV TIEBACK SLV 10722~
9-5/8" X 5-1/2" TNV RP LNR HGR 10734~
9-5/8" CSG, 47#, NT-80S, ID = 8.681" 10973~
5 112" ~v hipstock 91305'
PERFORATION SUMMARY
REF LOG: NL MWD ELMAG WR/GR ON 11/24/88
ANGLE AT TOP PERF: 57 @ 10990'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10990 - 11020 C 05/09/95
3-3/8" 6 11230 - 11250 G 2/15-17/96
3-3/8" 6 11260 - 11280 C 2/15-17/96
3-3/8" 6 11296 - 11326 G 2/15-17/96
3-3/8" 6 11330 - 11350 C 2/15-17/96
3-3/8" 6 11370 - 11380 C 2/15-17/96
3-3/8" 6 11380 - 11410 G 01/30/96
3-3/8" 6 11440 - 11460 C 2/15-17/96
3-3/8" 6 11460 - 11490 C 01/30/96
SLT 11614 - 13310 H 9i160H
AFEfY NOTES: WELL IXCEEDS 70° @
11200' & GOES HORIZONTAL @ 11600'.
2097~ ~5-1/2" CAMCA SSSV NIP, ID = 4.562"
GAS LIFf MANDREIS
ST MD ND DEV TYPE VLV LATCH PORT DATE
6 3386 3382 12 CAM DOME RK 16 02/11/08
5 6013 5388 45 CAM DOME RK 16 02/11/08
4 7973 6813 46 CAM DOME RK 16 02/11/08
3 9302 7744 46 CAM SO RK 24 02/11/08
2 10000 8227 44 CAM DMY RK 0 02/11/99
1 10068 8276 43 CAM DMY RK 0 04/03/04
10147' I-15-~~2" OTIS SLIDING SLEEVE ID = 4.562"
10207' TNV PaR SEAL ASSY
10222~ 9-5/8" X 5-1/2" TNV HBBP PKR, ID = 4.75"
10273~ 5-1/2" OTIS X NIP, ID = 4.562"
10~ 314~ ~--~ 5-1 t2" HES XN NIP, (~ = mflied to 4.55" ~
10717' 5-1/2" TNV SEAL NIPPLE W/O SEALS
10729~ ELMD
1033$' 3-112" STL X NIF, IL~ = 2.813"
2-718'" LNR ~a.4#, STL 9 3Cr80, ID = 2.441" 'f 1931-13$35
5-1/2" SLTD LNR, 17#,
L-80, .0232 bpf, ID = 4.892"
DATE REV BY COMMENTS DATE REV BY CAMMENTS
12/70/88 ORIGINAL COMPLETION 03/11/08 CJrUTLH IBP PULLED/PLUG SET 3/1/08
07/14/01 CH/KAK CORRECTIONS 04/02/08 KDGPJC SET WRP (03/13/08)
04/03/04 GJB/KA GLV GO 09/17/08 IMM MILL XN, CNiI" SQZ
04/23/05 JR,4/TLH IBP SET (04/04/05) 12/O8/08 MSE CTD SIDETRACK
09/10/05 KSB/TLH IBP PULLm (06/05/05)
02/11/08 KSB/TLH GLV GO & TVD CORRECTIONS
PRUDHOE BAY UNff
WELL: Y-25A
PERMff No:
API No: 50-029-21883-01
SEC 33, T11 N, R13E, 1403' SNL & 169' WEL
BP Exploration (Alaska)
•
•
~.~ ~.. ~ ~ ~ tt ,! ~ ~'~'' f ~_ ' ~VV ~' ~ {~~'`` ~~~' s ,/ SARAH PAL/N, GOVERNOR
ALASSA OIL A.rTD (~]$ /
COI~TSERQATIOI~T Cpj1111Tis510~ ~ 333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
~ PHONE (907) 279-1433
FAX (907) 276-7542
John McMullen
Engineering Team Leader
BP Exploration Alaska Inc. ~~ $ ~ P ~ :~ 2D0$
PO Box 196612
Anchorage, AK 99519-6612 ~ Q~ ~ ~ 3
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Y-25
Sundry Number: 308-320
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
~~
Cathy P. Foerster
Commissioner
DATED this D_ day of September, 2008
Encl.
$~ STATE OF ALASKA 1~`S ~ ~ ~ ~
O
ALAS IL AND GAS CONSERVi4T10N COMMISSIZ7N 8
SEP 0 4 20Q i
APPLICATION FOR SUNDRY APPROVAL ~ ~~.
1. Type of Request: ® andon i ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ~~!i~~;{3i`,3~5£
Iter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ^ Pull Tubing ^ Pertorate New Pool ^ Waiver ^ Other
2. Operator Name:
BP Exploration Alaska) Inc. 4. Current Well Class:
®Development~ ^ Exploratory 5. Permit To Drill Number
188-131 -
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 ^ Service ^ Stratigraphic 6. API Number:
50-029-21883-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest
property line where ownership or landownership changes:
Spacing Exception Required? ^ Yes ®No 8. Well Name and Number:
PBU Y-25
9. Property Designation:
ADL 028288 ' 10. KB Elevation (ft):
78.7' ~ 11. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
12• PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft):
13418' ~ Total Depth TVD (ft):
9006' ~ Effective Depth MD (ft):
13310' Effective Depth TVD (ft):
900T Plugs (measured):
1014T Junk (measured):
Yes, Unknown Depth
/" 4
Perforation Depth MD (ft):
Below Plup: 10990' -13310' Perforation Depth TVD (ft):
8873' - 9007' Tubing Size:
S-1/2", 17# Tubing Grade:
L-80 Tubing MD (ft):
10710'
Packers and SSSV Type: 9-5/8" x 5-1/2" TIW'HBBP' packer Packers and SSSV MD (ft): 10222'
13. Attachments:
® Description Summary of Proposal ^ BOP Sketch
^ Detailed O erations Pro ram 14. Well Class after proposed work:
^ Exploratory ®Development ^ Service
15. Estimated Date for
Commencin O rations: Se tember 11, 2008 16. Well Status after proposed work:
^ Oil ^ Gas ^ Plugged ®Abandoned~
17. Verbal Approval: Date:
Commission Re esentative: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
18. I hereby certify that ,fie foregoing is true and correct to the best of my knowledge. Contact Marv Endacott, 564-4388
Printed Name J s .Title Engineering Team Leader
~ePerea ey Narnen~umber:
Signatu Phone 564-4711 Date Terrie Hubble, 564-4628
Commission Use On
Sundry Number:
Con iti s of approval: Notify Commission so that a representative may witness
^ ug Integrity ''BOP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: ?~~ O PS ` 'p IF1~
Subsequent Form Required: ~`'~
APPROVED BY ~J„ /~
A roved B ~ COMMISSIONER THE COMMISSION Date f~
Form 10-403 ~~ised~2006
20 AAC 25.280 A12Ska QiE ~ ~~~ ~~ns. C mmssi®n
t
. _ I~F~.: CEP ~f 9 ZODB
Submit In Duplicate
.~ ~
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: M.S. Endacott
CTD Engineer
Date: September 3, 2008
Re: Y-25 Sundry Approval
CC: Well File
Sondra Stewman/Terrie Hubble
Sundry approval is requested to abandon perforations & slotted liner on well Y-25.
"~" by
Y-25A Objectives:
• Establish offtake point to south of current wellbore. Test Zone 4 Section along upthrown side of N-S
Down-To-West fault
• Assess fluid saturations east of fault. Evaluate P-23i injection conformance and sweep efficiency.
• Run 3 1/2" Cr scab liner up across corroded tubing from new production liner top to 6050' (just below
GLM#5 in 5 1/2" tbg)
• New production liner to position XO/kick-off point for future access to target identified to the west.
Well History:
Y-25 is a horizontal well drilled in 1988 to a Zone 4 target in the northwest section of the Y Pad area. It has
cum'd 4.1 mmbo to date, last tested at 98% we and is currently SI due to Txl communication. The Y-25 wellbore
is a 5 '/z" monobore completion. The production liner is cemented and perforated down to 11,579' and slotted
liner below that to a TD at 13,418'. Initial production was from the slotted liner section only and started at 6000
bopd. In two years it declined to a steady 1000 bopd at 80% we and 1000 gor. In February 1996 the cemented
heel section of the wellbore was perforated (--180') and the rate jumped to 1800 bopd. The increase quickly
declined as the we increased to >90%. Gross fluid rate has been consistent but oil rate has been in gradual
decline since then. Latest test was 150 bopd at 98% we and 5000 gor.
Y-25 was shut in February 2008 for Txl communication. A tubing caliper run 2/5/08 indicated significant line
corrosion in the tubing below 8000' and a hole in the tubing at 10,078'. A short tbg patch over the hole was
considered but at least 5 other joints have > 50% penetration. An extended tubing patch was considered but the
corrosion extends down into the uppermost perfs so there is no place to land the lower packer. Economics for
the current low rate, high water cut well will not support a stand alone RWO. A CMIT-Txl to 2500 psi passed on
6-18-08 confirming production casing integrity.
Proposed Lateral
This CTD sidetrack will isolate the slotted liner section in the parent well and be completed with a
cemented/perforated production liner. The liner will include a CTD Tiny Tool (TT) kick-off point that will allow
future access to a target that has been identified further to the west. A scab liner will be run from the top of the
production liner to 6050' Qust below GLM#5 in the 5 '/z" tbg). This will cover the corroded tubing, enable
hydraulic efficiency and restore wellbore integrity.
Recoverable reserves are estimated at 824 MBO. Any remaining reserves in the parent well are expected to be
recovered in the new lateral.
•
Pre-Rig Work Summary: (Scheduled to begin on September 11, 2008)
1. Passed CMIT
2. Mill XN ~ 10314' to 4.55" (pending mill availability)
3. Drift for 5-1 /2" cement retainer to 11,600', set retainer+++ 0111,550' (in blank pipe)
4. Squeeze long slotted liner with --130bbbl cement
+++Cement retainer may not set in corroded pipe, if so, then lay in cement
5. Drift for 5-1/2" monobore whipstock Baker permanent, special 4.55" tray to 11,400'
Rig Sidetrack Operations: (Scheduled to begin on October 15, 2008 using Nordic rig 2
1. MIRU ~, ~~ ~ J
2. NU 7-1/16" CT Drilling BOPE and test -~c7 35~C7 QS
3. Set Baker permanent 5'/z" whipstock at 11,300'
Y. /VYYI IJUUGGLC ^' 1 JUUI 1 J.000U 1.C111C1 IL
5. Mill 4.55" window
6. Drill lateral with 4.5" bit
7. Run and cement a 3-1/2" x 2-7/8" 13Cr liner string, cement with 45bb1
8. Clean out and CCVCNL
9. Perforate well
10. Run 3-1 /2" 13Cr tieback to isolate hole in tubing, LTP to 6050'
11. FP, Set BPV. ND 7-1/16" stack. FP tree and PT tree cap
12. RDMO
Post-Rig Work:
1. Pull BPV.
2. Re-install well house and FLs
3. Run gas lift design
4. RU test separator, flow test well. 1000' of Perforations
JVELLHEAD ~ MCEVOY
~I 4CTUATOR= BAKER
46. ELEV = 78.71'
3F. ELEV = 51.21'
40P _ __ 3300'
flax Angle = 92 @ 11700'
datum MD = 11000'
datum TVD = 8800' SS
~ 13-3/8" CSG, 72#, L-80, ID = 12.347" ~
Y-2 5 51200 &NGOF~ HORIZONTAL @ 11600'.
2097 H 5-1 /2" CAMCO SSSV NIP, ID = 4.562"
Minimum ID = 4.455" @ 10314'
5-1 /2" HES XN NIPPLE
GAS LIFT MAND RELS
3T MD TVD DEV TYPE VLV LATCH
6 3386 3382 12 CAM DOME RK
5 6013 5388 45 CAM DOME RK
4 7973 6813 46 CAM DOME RK
3 9302 7744 46 CAM SO RK
2 10000 8227 44 CAM DMY RK
1 10068 8276 43 CAM DMY RK
DRT DATE
16 02/11/0!
16 02/11/0!
16 02/11/0!
24 02/11/02
0 02/11/95
0 04/03/0
10147' x'15-1/2" OTIS SLIDING SLEEVE ID = 4.562"
10147' 5-1/2" PX PLUG (06/16/08)
10207' --~TNV PBR SEAL ASSY~
10222' H 9-5/8" X 5-1/2" TNV HBBP PKR, ID = 4.75"
10273' 5-1/2" OTIS X NIP, ID = 4.562"
I5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" I
~TNV TIEBACK SLV
9-5/8" X 5-1/2" TNV RP LNR HGR
9-5/8" CSG, 47#, NT-80S, ID = 8.681"
PERFORATION SUMMARY
REF LOG: NL MWD ELMAG WR/GR ON 11/24/88
ANGLE AT TOP PERF: 57 @ 10990'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10990 - 11020 C 05/09!95
3-3/8" 6 11230 - 11250 G 2115-17196
3-3/8" 6 11260 - 11280 C 2/15-17/96
3-3/8" 6 11296 - 11326 C 2115-17/96
3-3/8" 6 11330 - 11350 C 2/15-17/96
3-3/8" 6 11370 - 11380 C 2/15-17196
3-3/8" 6 11380-11410 C 01/30/96
3-3/8" 6 11440 - 11460 C 2/15-17/96
3-3/8" 6 11460 - 11490 C 01/30/96
SLT 11614 - 13310 C 12/06/88
.`
~`
C
~ ~~
~~
~ ~~
~ ~
I
.`
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff
12/10/88 ORIGINAL COMPLETION 03/11/08 CJN/TLH IBP PULLED/PLUG SET 3/1/08 WELL: Y-25
07/14/01 CH/KAK CORRECTIONS 04/02/08 KDC/PJC SET WRP (03/13/08) PERMIT No: 1881310
04/03/04 GJB/KA GLV C/O 06/28/08 BSE/SV PXN PULL (03/12/08) API No: 50-029-21883-00
04/23/05 JRA/TLH IBP SET (04/04/05) 06/28/08 BSEISV SET PX /WRP PULLED (06/16/0 8) SEC 33, T11 N, R13E, 1403' SNL & 169' WEL
09/10/05 KSB/TLH IBP PULLED (06/05105) 07/01/08 PJC DRAWING CORRECTIONS
02/11/08 KSB/TLH GLV C/O & TVD CORRECTIONS BP Exploration (Alaska)
5-1/2" HES XN NIP,ID = 4.455"
10717' -i 5-1/2" TM/ SEAL NIPPLE W/O SEALS
10729' ELMD
? I-i FISH: WRP ELEMENTS (06/16/08)
11575 I-I5-1/2" LNR, 17#, L-80, .0232 bpf, ID =
11579 I--I CTC EXT CSG PKR
TREE = 6" CNV
WELLhEA'D = MCEVOY
ACTUATOR= BAKER
KB. ELEV = 78
.71'
BF. ELEV = _
51.21'
KOP = 3300'
Max Angle = 92 @ 11700'
Datum MD = 11000'
Datum TV D = 8800' SS
-2 5 A SAFETY NOTES: WELL EXCEEDS 70° @
11200' 8 GOES HORIZONTAL @ 11600'.
Proposed CTD Sidetrack
O
~ 13-3/8" CSG, 72#, L-80, ID = 12.347" ~
6050' top 3-1/2" 13G tie back 5-1/2 x 3-1/2" WFD ER PKR
Minimum ID =
5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" ~ 10710'
TNV TIEBACK SLV 10722'
9-5/8" X 5-1/2" TNV RP LNR HGR 10734
9-5/8" CSG, 47#, NT-80S, ID = 8.681" 10973
5 1/2" monobore w hipstock 11300'
5 1/2" cement retainer 11550'
PERFORATION SUMMARY
REF LOG: NL MWD ELMAG WR/GR ON 11/24/88
ANGLEATTOPPERF: 57 @ 10990'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10990 - 11020 C 05/09/95
3-3/8" 6 11230 - 11250 C 2/15-17/96
3-3/8" 6 11260-11280 C 2/15-17/96
3-3/8" 6 11296 - 11326 C 2/15-17/96
3-3/8" 6 11330 - 11350 C 2/15-17/96
3-3/8" 6 11370 - 11380 C 2/15-17/96
3-3/8" 6 11380 - 11410 C 01 /30/96
3-3/8" 6 11440 - 11460 C 2/15-17/96
3-3/8" 6 11460 - 11490 C 01 /30/96
SLT 11614 - 13310 C 12/06/88
i 5-1/2" CAMCO SSSV NIP, ID = 4.562" i
c;a S i i~r nna rvnR~ c
ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 3386 3382 12 CAM DOME RK 16 02/11/08
5 6013 5388 45 CAM DOME RK 16 02/11/08
4 7973 6813 46 CAM DOME RK 16 02/11/08
3 9302 7744 46 CAM SO RK 24 02/11/08
2 10000 8227 44 CAM DMY RK 0 02/11/99
1 10068 8276 43 CAM DMY RK 0 04/03/04
10147, I -~ 5-1 /2" OTIS SLIDING SLEEV E ID = 4.562"
10207' TNV PBR SEAL ASSY
10222' 9-518" X 5-1/2" TNV HBBP PKR ID = 4.75"
10273' 5-1/2" OTIS X NIP, ID = 4.562"
10280' TOP3-1/2" x 2-7/8" LINER
10314' 5-1/2" HES XN NIP, ID =milted to 4.55"
10717' 5-1/2" TNV SEAL NIPPLE W/O SEALS
10729' ELMD
~3-1/2" x 2-7/8" 13Cr Liner, Cemented & Perf'd
XO 12600'
~ CTC EXT CSG PKR ~
15-1/2" SLTD LNR, 17#,
L-80, .0232 bpf, ID = 4.892"
DATE REV BY COMMENTS DATE REV BY COMMENTS
12/10/88 ORIGINAL COMPLETION 03/11/08 CJN/TLH IBP PULLED/PLUG SET3/1/08
07/14/01 CWKAK CORRECTIONS 04/02/08 KDGPJC SET WRP (03/13/08)
04/03/04 GJB/KA GLV GO 09/03/08 MSE PROPOSED CTD SIDETRACK
04/23/05 JRA/TLH IBP SET (04/04/05)
09/10/05 KSB/TLH IBP PULLED (06/05/05)
02/11/08 KSB/TLH GLV GO 8<TVD CORRECTIONS
13787'
y~ PBTD 13740'
5-1/2" LNR, 17#, L-80, .0232 bpf, ID = 4.892"
FISH: IBP BANDS (8) 8 2"
OF FISH NECK (02/28/08)
' ~ PBTD
PRUDHOE BAY UNfr
WELL: Y-25A
PERMIT No:
API No: 50-029-21883-01
SEC 33, T11 N, R13E, 1403' SNL & 169' WEL
BP Exploration (Alaska)
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
MPC-41
MPG-05
MPL-33
P-06A
DS 02-25
D.~. 09-10
B-20
Y-25
PSI-10
P-26
02-14A
F-12
04-35
t5-09A
15-09A
5-09A
". J-13
D.S. 09-29
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job#
10889195
10715440
11058514
11132061
10987525
11058237
10980591
10928605
10715447
10928634
11075901
NA
10889172
10889183
NA
10919942
10877750
10980596
~NE') OCT 3 12005
Log Description
SBH SURVEY
MPSP INJECTION PROFILE
INJECTION PROFILE
LDL
INJECTION PROFILE
INJECTION PROFILE t>...~ r \t ~ ~
LDL
MEM PPROF W/DEFT
MPSP IPROF & WARMABACK
MEM PPROF W/DEFT
MEM PPROF & IPROF
LDL
SBHP SURVEY
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
LDL
PPROF W/DEFT
c
o&-~~-
Date
12/24/04
11/09/04
06/03/05
10/12/05
06/24/05
08/16/05
08/05/05
11/20/04
01/01/05
06/02/05
07/09/05
06/03/05
10/10/04
11/04/04
02/02/05
02/13/05
06/29/04
08/10/05
NO. 3503
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
CD
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503- 8
A TTN: Beth
Received by:
10/18/05
--
'ðJ '
~l
f gJ--t3:1
~1~
1. Operations performed:
I'%r' ~,r" I V r- LJ
STATE OF ALASKA '- JUN 2 8 2001
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATION o, &,Sjj,
Operation shutdown_ Stimulate _X Plugging _ Perforate'_' .......
Acid/Scale Inhibitor
Pull tubing _ Alter casing _ Repair well _ Other_X
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
1402' FNL, 169' FEL, Sec. 33, T11N, R13E, UM
At top of productive interval
4403' FNL, 5057' FEL, Sec. 28, T11 N, R13E, UM
At effective depth
1111' FSL, 1090' FEL, Sec. 29, T11N, R13E, UM
At total depth
1294' FSL, 1891' FEL, Sec. 29, T11N, R13E, UM
5. Type of Well:
Development __X
Explorato~__
Stratigraphic__
Service__
(asp'$ 644647, 5948850)
(asp's n/a)
(asp's638394, 5951247)
(asp's 637588, 5951416)
6. Datum elevation (DF or KB feet)
RKB 79 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-25
9. Permit number / approval number
188-131
10. APl number
50-029-21883
11. Field / Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
13418 feet Plugs (measured)
9008 feet
IBP set @ 12595'. (07/26/1998)
Effective depth: measured 12595 feet Junk (measured)
true vertical 9014 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 110' 20" 72 c.f. Concrete 138' 138'
Surface 2636' 13-3/8" 3723 c.f. Arcticset III & II 2664' 3076'
Intermediate 10946' 9-5/8" 2435 c.f. Class 'G' 10974' 8752'
Liner 879' 5-1/2" 441 c.f. Class 'G' 10734' - 11613' 8485' - 8917'
Slotted Liner 1805' 5-1/2" Uncemented 11613' - 13418'
Perforation depth: measured Open Perfs 10990' - 11020', 11230' - 11250', 11260' - 11280', 11296' - 11326', 11330' - 11350',
11370'- 11410', 11440'- 11490', 11614'- 1,2594'. Beyond IBP 12594'- 12897'
true vertical Open Perfs 8873' - 8888', 8975' - 8980', 8983' - 8988', 8992' - 8999', 9000' - 9004',
9008' - 9015', 9020' - 9027', 9032' - 9014', Beyond IBP 9014' - 9011 '.
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 TBG @ 10222' MD. Tubing Tail @ 10729' MD.
3ackers & SSSV (type & measured depth) 9-5/8" x 5-1/2" TIW (HBBP) Packer @ 10222', CTC packer set @ 11579'.
5-1/2" Otis HRQ SSSVLN @ 2097'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
OiI-Bbl
Representative Daily Average Production or Injection Data
Gas-Mc~ Water-Bbl
Casing Pressure Tubing Pressure
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil __X Gas __ Suspended __
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
,~,~'~'~lJ~ ~~~ Title: Technical Assistant
DeWayne R. Schnorr
Date June 26, 2001
Prepared by DeWa)/ne R, Schnorr 564-5174
SUBMIT IN DUPLICATE~
Y-25
Description of Work Completed
NRWO OPERATIONS
04/21/2001
04/23/2001
04/28/2001
04/29/2001
ACid: TiFL (PRE ACid)
ACID: D&t (PRE-CT SET IBP, ACID STEM) (HAW)
ACID: ACID/SCALEINHIBITOR
ACID: ACID/SCALE INHIBITOR
SUMMARY
04/21/01 TIFL PASSED (PRE ACID). TIFL PASSED (PRE ACID); BLED IA
FROM 1500 PSI TO 300 PSI IN 2.5 HRS. IA FL STARTED AT 10,000' AND
REMAINED UNCHANGED DURING TIFL. WELL BOL.
04/23/01 RAN 3.625 SWAGE, STOP DUE TO DEVIATION 11,148' SLM.
RETURN WELL TO PRODUCTION
04/28/01 MIRU UNIT NUMBER 8. ATTEMPT TO SET IBP. SHEAR OFF AND
DROP IBP. PUSH TO BOTTOM. RIH WITH SAME. SET WITH CENTER OF
ELEMENT AT 11542 CTMD. DROP BALL TO OPEN CIRC. SUB. (CONT'D)
04/29/01 SHEAR CIRC SUB. PUMP 7 BBLS ACID AND DISPLACE WITH
DIESEL. LET SOAK FOR 1 HR. PUMP 72 BBLS ACID WHILE
RECIPROCATING ACROSS INTERVAL 11200-11500 AND PUMPING DOWN
BS. SWITCH TO KCL. (NO TRUE "BREAK DOWN SEEN, THE BS PRESSURE
DROPPED APPROXIMATELY 150 PSI WHILE PUMPING ACID THROUGH
COIL.)RIH TO ENSURE NO ACID ON IBP. IBP IS GONE. FREEZE PROTECT
COIL. TAG IBP AT 12582. POH. MU FISHING TOOLS. RIH AND LATCH IBP #2
AT 12581 CTMD. POH AND RECOVER IBP #2. RERUN FISHING TOOLS AND
RECOVER IBP #1 FROM 12588. (NOTE: IBP #1&2 WERE THE ONES LOST
ON THIS SI JOB. THE OTHER ONES REMAIN ON BOTTOM FROM
PREVIOUSLY) ALL RUBBER ELEMENTS FROM BP WERE LEFT IN HOLE.
WELL IS READY TO POP. [ Scale Inhibitor]
Fluids Pumped
BBLS. Description
33 33 BBLS DIESEL
189 189. BBLS MEOH
217 217 BBLS KCL
20 20 BBLS 2% KCL
79 79 BBLS ACID
538 TOTAL
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
OCTOBER 24, 2000
P
M
E
E
L E W
A T E R IA L U N D ER
TH IS M A R K ER
STATE oF ALASKA
AL-~SKA OIL AND GAS CONSERVATION COMMI$~,ON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
1402' SNL, 168' WEL, SEC. 33, T11N, R 13E, UPM
At top of productive interval
876' NSL, 223' EWL, SEC. 28, T11N, R13E, UPM
At effective depth
1270' NSL, 1791' WEL, SEC. 29, T11N, R13E, UPM
At total depth
1296' NSL, 1897' WEL, SEC. 29, T11N, R13E, UPM
ORIGINAL
6. Datum elevation (DF or KB)
KBE = 78,71 AMSL
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
Y-25 (44-29-11-13) PBU
9. Permit number/approval number
88-131 /
10. APl number
50- 029-21883
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length
..
13418 feet
BKB 9008 feet
13310 feet
BKB 9008 feet
Size
Plugs (measured)
Junk (measured)
Cemented
2636
10945
..
891
measured
20 8 c.y.
13 3/8 3723 c.f.
9 5/8 2435 c.f.
5 1/2 441 c.f.
11614'- 12897' (horizontal)
Measured depth True vertical depth
BKB
2664 2664
10974 8865
10722-13418 8719-9008
true vertical subsea
8953'-8933'
Tubing (size, grade, and measured depth) 5 1/2" L-80 to stabbed into top of 5 1/2" liner at 10722'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
9 5/8" TlWpacker at 10222', open-hole CTC packer at 11579';
5 1/2" SSSV at 2097' ~ r r' ! ~ ! ~ r~
P~r. Lr..IVLL/
Intervals treated (measured)
Treatment description including volumes used and final pressure
MAR 2 7 1996
Alaska 0il & Gas Cons. Commission
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
823 211 1863 2720
945 389 2132 2760
Tubing Pressure
395
297
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations __ Oil X Gas Suspended
17. I hereby certify that the fo)/~:joing is tr, u_e al;Id correct to the best of my knowledge.
,, , ( (--
S i ~ n ed'~~~~.[ -._~¥~~.~ Title TechnicalAssistantlll
Form 10-"404 Rev 06/15/88
Service
SUBMIT IN DUPLICATE
5~09~95
· interval were teperfotatecl using 3 315" gunS, 6 SPF,
~e fonoW, m~ .:^. and 600 ph~ing.
10990' ' ~°2°' ~D
RECEIVED
MAR 2 7 1995
Alaska Oil & Gas Cons. Commission
Anchorage
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
September 21, 1994
Jerry Bixby/Steve Farris
Wireline/Completion Supervisors
BP Exploration (Alaska), Inc
P O Box 196612
Anchorage, AK 99519-6612
Re:
No-Flow Verification
Seven BPX PBU Wells
Dear Mr. Bixby/Farris:
Our inspectors have witnessed no-flow tests on and recommended no-flow
status for seven BPX PBU wells.
The wells were open to an atmospheric tank to determine fluid production
and monitored through a gas meter to determine gas production rates.
The inspectors recommended "no-flow" status for the wells listed below.
Well No. PTD No. Test Date Inspector Fld Rate 'Gas Rate
B-17 79-28 8/26/94 D Amos dead 180 scf/h
Y-28 91-065 9/07/94 J Spaulding dead 10 scf/h
Y-19 88-096 9/09/94 J Spaulding dead 330 scf/h
Y-23 86-087 9/09/94 J Spaulding dead 0 scf/h
~Y'25 88-131 9/09/94 J Spaulding dead 120 scf/h
R-4 79-038 9/18/94 L Grimaldi dead 288 scf/h
R-13 38-044 9/19/94 L Grimaldi dead 60 scf/h
The Commission hereby authorizes removal of the subsurface safety valves
from the B?X PBU wells listed above on the condition that the low-
pressure sensor and surface safety valve must be maintained in good
condition and, if for any reason, the well again becomes capable of
unassisted flow of hydrocarbons, the subsurface safety valve must be
reinstalled and maintained in good working condition.
Sincerely,
Blalr E. Won~ell
PI Supervisor
c: John Spaulding
bew/n 1 pb7bpw
{~) printed on recycled Dape[ b V C 13
MEMORANDUM'
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
FROM:
David John ~n, DATE:
Chairm~
Blair Wondzell, ~ FILE NO:
~lzof~
P. I. Supervisor ~r~~~
John Spaulding~ ~ SUBJECT:
Petroleum Insp.'~'~.l~,"-
September 9, 1994
1H9LIIBD.doc
No-Flow Tests
BPX PBU Y-23,25,19
Prudhoe Oil Pool
Friday, September 9, 1994; I traveled to BPX PBU wells Y-19,23,25 to witness
No-Flow test.
.,
The wells were bled to an atmospheric tank thru a 2" line prior to my arrival. The
tubing was then connected to the American AL-425 gas meter with 112" hose.
The wells Were then monitored every 112 hr. for a I 112 hour period.
Well Y-19 showed an increase from 45 scflhr, to 330 scf/hr, over the I 112 hr.
period and about 10 psi.
Well Y-23 showed 0 scf/hr, and 0 psig.
Well Y-25 did not exceed 120 scf/hr and showed a slight amount of press, to the
touch.
Therefore I recommend No-Flow status be granted to wells Y-19,23,25 with well
Y-19 to be re-tested and witnessed in 90 days.
Summ~ry;. I witnessed the No-Flow tests on BPX PBU wells &-19,23,25, no
failures.
Attachment: none
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 15 May 1995
RE: Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
PDK FINAL BL+RF
PFC/PERF FINAL BL+RF
CCL FINAL BL+RF
ECC No.
Run # 1 5847.01
Run ~ 1 6118.01
Run # 1 6238.07
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
Please $iSa end r. etu~ %O~
Petro%echni~al Da~a Cen%e~
BP Exp~oration (Alaska) In~
900 Eg~t Benson Boulevar~
. . ~.,~.~.-~'--~.' ...
Alaska 011 & ~as Cons. Commission
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 21 January 1994
RE: Transmittal of Data
ECC #: 6118.00
Data: PL
Dear Sir/Madam,
' 'Reference:
BP
Y-25 (44-29-11-13)
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, .please find. the data as.described below:
Prints/Films: 1
1
Sent by U.S. MAIL
PLS STATIC FINAL BL
PLS STATIC FINAL RF
Run # 1
Run # 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600. B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
BP EXPLORATION
C. V. Chatterton, Chairman
Oil and Gas Conservation Commission
State of Alaska
3001 Porcupine Drive
Anchorage, AK. 99501
Dear Mr. Chatterton'
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5.111 /',/, ?
June 15, 1989
BP Exploration is requesting administrative approval, as outlined in Conservation
Order No. 213, Rule 2, to waive productivity profile requirements for new Prudhoe
Bay Unit well Y-25. The waiver is requested because the well is an inverted high
angle completion with a deviation of 92 degrees. The completion interval is as
follows'
11614'- 13310' MDBKB (1696')
8956' - 8931' TVDss (25')
An increased risk is associated with obtaining production logs in this well as all
production logs would have to be coiled tubing conveyed. If future production
characteristics warrant evaluation for remedial work, production logs would be
obtained at that time.
If you require further information, please contact B. J. Policky at (907)564-5232.
Very truly yours,
& o T. B. Gr~v4', Manager,
Reservoir Surveillance
TBG:BJP:SMB:smb
cc:
R. E. MacDougal (Exxon)
D. F. Scheve (ARCo)
D. D. Smith (ARCo)
RE 6.1
RECEIVED
Alaska Oil & Gas Cons, Commission
Anchorage
AOGCC Production Pr, f"'~., Waiver
Y-25 (Inverted Hi.ah Anh~ Well)
bcc: V.W. Holt ,~ B. J. Policky~V~
P. B. Production Engineering Supervisor
P. B. Reservoir Engineer
Well File
BP EXPLORATION
.~CO
F~LXON
~D: PHILLIPS T~: 79840
STATE OF AK
BP Exploration (Alaska)Inc.
g00 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: 02/23/89
SYSTEMS (Transmittal & Tape) ,
ARCHIVES
BP MAGNETIC LIS TAPES & LISTINGS
The following material is being sutmitted herewith. Please acknowledge receipt by
signing a copy of t_his letter and returning it to this office:
Y-25 OH MWD 11/23/88 #I-24 10200-13430
Teleco#665 1600bpi API#50-029-21883
Tape Pos. #06338
* E~-%0N: An Asterisk (*) next to a listing above means you should
have received the Tape(s) and Listing(s) directly from the respective
service company. Please confirm this.
Received
Date
Anch0ra,q~
__ Records
Di&tz
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
INDEXED
BP Exl~lora(ion (Alaska) Inc, "-'--'
900 East Benson Boulevard
RO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Bate: 04-21-89
,
r~: 79995
,,
REFERENCE:
BP F~AL DATA - PRESSURE SURVEY DATA
The following material Is being submiTTed herewith. Please acknowledge recelp* by
signing a copy of this .leTTer and returning It to this office:
W-24 04'-12-89 BHP--S tatic Gradient Camco
Y-25 04-15-89 BHP--S tatic Gradient Camco
Y-25 04-13-89 BHP--S tatic Gradient Camco
Z-24 04-13-89 BHP--Static Gradient Camco
Z-06 04~04-89 BHP--S tatic Gradient Camco
Received
Da'l-e
Alaska 0il & Gas Cons. Commission
Anchorage
Shirley R. McCurry
INFORNATION CONTROL
Well Records LR2-1
BP EXPLORATION
HOUSTON
BP Exploration (Alaska) Inc.
g00 East Benson Boulevard
P.O. Box: 196612
Anchorage, Alaska 99519-6612
(907) 561-5m
TO:
ARCO
CHEVRON
EXXON
TEXACO
MARATHON
I
Da're:
T~:
.,
04-06-89
79934
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES '.
REFERENCE:
ARCHIVES
B~, 'OPEN HOLE FINAL LOGS
The following maferlal is being submitted herewith. Please acknowledge receipt by
signing a copy of this let-ter and returning it to this office:
HOU/UNIT / STATE:
Y,25
MWD GAMMA PLus Directional
10559' 13344 Job// 665 TAK
Y-25 MWD GAMMA Plus Directional
10559-13344 Job// 665 TAK
Y-25 MWD GAMMA Plus Directional
10559-13393 Job// 665 TAK
Y-25 MWD GAMMA Plus Directional
10559-13393 Job// 665
11-11/23-88 //24
Teleco 5"
11-11/23-88 //2'4
Tele'co 2"
11-11/23 88 //24
Teleco 5"
11 -11/23-88 .//24 '
.,
~ Al~S,~a Oil a G~s Con~. Commission Anchorage
STATE ONLY: DIRECTIONAL SURVEYS
Magnetic Single Shot Directional Survey Date:
GYr'dscopi. C Directional '~Survey" Date:
Job#:
Job#:
Rece I ved
Dai*e
Shirley R. McCurry
I NFORMAT ION CONTROL
Wel I Records LR2-I
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO:
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF.ALASKA
ARCHVIES
DATE: 03/21/89
T%: 79895
BP FINAL DATA - PRESSURE SURVYE DATA
The following material is being submitted herewith. Please acknowledgr
receipt by signing a copy of this letter and returning it to this office
G'25 Static Gradient 03/04/89 Camco
J-29 Static Gradient 02/22/89 Camco
M-29 Static Gradient 03/08/89 Camco
Y-08''~ Flowing Gradient 02/16/89 Camco
Y-25 Step Rate Data/PBU 02/03//89 Camco
Received:
Date:
Anchorage
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
?""~ STATE OF ALASKA ~
ALASKA 0IL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG a
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Standard Alaska Production Company 88-131
3, Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 s0- 029-21883
4. LOcation of well at surface I~---.._o.__..., 9. Unit or Lease Name
1402' SNL, 168' WEL, SEC. 33, T11N, R13E[[OC_Ar~ONS ~ Prudhoe Bay Unit
VEJ~IFIED ~ 10. Well Number
At Top Producing Interval
~ Y-25 (44-29-11-13)
4403' SNL, 5057' WEL, SEC. 28, T11N, R13E 11. Field and Pool
At Total Depth
Prudhoe Bay Field/Prudhoe Bay Pool
3984' SNL, 1897' WEL, SEC. 29, T11N, R13E ..
5".' Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No.
KBE= 78.71' lADL 28288
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Suep. or Aband. ~15. Water Deplh, if offshore 116. No. of Completions
10/31/88 11/24/88 12/12/88I N/A feet MSL I One
1~. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
I
13418' MD 9008' TVD 13310' MD 9008'TVD YES [] NO [] 2098 feet MD I 2000'
....
22. Type Electric or Other Logs Run
GR/EWR/CNO/SFD
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMB~FING RECORD AMOUNT PULLED
20'~ Conductor Surface 8 cu. yds. Concrete
13-3/8" 68# L-80 Surface 2664' 17-1/2" 3723 cu. ft. Arctic Set III & II
9-5/8' 47# NT80S Surface 10974' 12-1/4" 2435 cu. ft. Class G
5-1/2'~ 17# L-80 10734' 11613' 8-1/2" 441 cu. ft. Class G
5-1/2" 17# L-80 11613' 13418' 8-1/2" Uncemented Slotted Liner
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MDI
Schlumberger 3-3/8" @ 4 spf. 5-1/2" 17# 10 710' 10222'
L-80 A/B Mod
MD TVDss 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11614'- 12897' 8953'-8933' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
13-3/8" X 9-5/8" Freeze Protect 13-3/8" x 9-5/8" Annulus
with 175 BBLS Dry Crude.
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lilt, etc.)
12/06/88 I Fiowing
Date of Test Hours Tested PRODUCTION FOR ~)IL-BBL GAS-MCF ~/ATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD II~
FI0w Tubing Casing Pressure CALCULATED,.~ C)IL-BBL GAS-MCF ~NATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
/~laska 0il & Gas Cons. Comm, l~
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplicate
:~E"'. ~ '.: : ,.: ;: ~.~ ; : ~: ,: I~lude~intew~-tested, pressure data,
.... u~. ~m . mu~.~m ~o~, ~ t~m~ o~ ~ ~.
' '
SHUBL1K A 11022" ' 8890'
ZONE 4 112~' 8982' .
....
~ ~. . .
,
, ,,, ....
31. LIS+ O~ i~AcHMEms '"
.................. , , ,
32. I' hereby cedify that lbo forogoi'ng ~ truo and ~ to tho b~t of my
Signed , { / ~ Title PRll Drilling Engineering Sup~misor Date .,, / /
.......... ~ , ,
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: AttaChed supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: FlOwing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDHOE BAY
October 31, 1988 at 0600 hrs
Rig: Nabors 18E
Well: Y-25 (44-29-11-13)
AFE # 120824 AFE Amount:
(Investment)
Current Amount:
Current Operation:
0600 Depth: 201'
Day: 0
Drilling 17-I/2" hole.
Accepted rig @ 0401 hrs on 10/29/88. Dug & installed cellar box. Drilled, installed &
cemented 20" conductor. Drilled 17-1/2" hole to 201'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDHOE BAY
November 1, 1988 at 0600 hfs
Rig: Nabors 18E AFE# 120824
(Investment)
Well: Y-25 (44-29-11-13)
AFE Amount:
Current Amount:
Current Operation:
0600 Depth: 1880'
Day: 1
Drilling 17-I/2" hole.
Drilled 17-1/2" hole with surveys to 1880'.
STANDARD
ALASKA PRODUCTION
Daily Drilli0g Report -- ['RUDI-[OE BAY
November 2, 1988 at 0600 hfs
Rig: Nabors 18E
Wett: Y-25 (44-29-1 I- 13)
AFE #
(Investment)
120824
AFE Amouni:
Cu rte n t A mou n t'
0600 Depth' 2685'
Day: 2
~Current Operation:
N/U BOP.
Drilled 17-1/2" hole with surveys to 2685'. Ran & cemented 13-3/8" casing.
STANDAR.D
ALASKA PRODUCTION
Daily Drilling Relmrl -- I>I?,UI)i'I()I': i~AY
November 3, 1988 at 06()(1 l~r.s
:Rig: Nabors 1SE
Well: Y-25 (44-29-11-1:3)
AFE # 120824 AI-:E Am(rant:
(lnvcsmmnt) Current A~oul~t'
0600 Depth: 2800'
Day: 3
Current Operation:
NU wellhead. Test 13-3/8" casing to 3000 psi. Cleaned out & ran FIT to 14.1 ppg. RIf4
with kick off assen~bly.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDiIOE BAY
November 4, 1988 at 0600 hfs
Rig: Nabors 18E
Welt' Y-25 (44-29-11-13)
AFE ti 120824 AFE Amount:
(Investment) Current Amount:
0600 Depth: 4172'
Day: 4
Cu.rrcnt Operation:
POOH.
KiCked off& drilled 12-I/4" hole with surveys to 4172'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDHOE BAY
November 7, 1988 at 0600 hrs
Rig: Nabors 18E
We,Il' Y-25 (44-29- I 1 - 13)
AFE #
(lhvestment)
120824
AFE Amount:
Current Amount:
0600 Depth: 7.080'
Day: 7
Current Operation'
RIH.
Drilled t2-1/4" hole with surveys to 7080'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- I:~RU[)I{()E BAY
November 8, 19.88 al 0600 hfs
Rig: Nabors 18E
Well: Y-25-(44-2%11- 13)
AFE it
(Investment)
120824 AIrE Amount:
Current Amount'
0600 Depth' 81 I I'
Day: 8
Current Operation:
Drilling 12-1/4" hole.
D,-511ed 12-1/4" hole with surveys to 8111'
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDIIOE-BAY
November 9, 1988 at 0600 hfs
Rig' Nabors 18E
Wctl' Y-25 (44-29-11-13)
AFE It
(Investment)
120824 AFE Amount:
Current Amount:
~0600 Depth- 8,874
Day: 9
-Current Operation:
I~(lcd 12 1/4" hole with surveys to 8,879'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDHOE BAY
November 10, 1988 at 0600 hfs
Rig: Na-bors 18E
Wet:i- Y-25 (44-29-11 - 13)
AFE #
(Investment)
120824 AFE Amount:
Current Amount:
0600 Depth: 9,783
Day: 10
Cucrent Operation:
RIH
Drilled 12-1/4" hole with surveys to 9,78Y. POOH for motor.
STANDARD
ALASKA PRODUCTION
l)aily l)rilling Reporl --PRUDIIOE BAY
Noveml)er I1, 1988 at 0600 hrs
Rig: Nabors 18E
W-ell' Y-25 (44-29-11 - 13)
AFE #
(Investment)
120824 AFE Amount:
Cu rrent A mount'
0.600 Depth: 1:0;070
Day' 11
Cu~ent Operation'
Drilling 12-I/4" hole.
Drilled 12-1/4" hole with motor to I0,070'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDll()E BAY
November 14, 1988 al 0600 hfs
Rig: Nabors I,E
Welt: Y-25 (44-29-11-13)
AFE #
(Investment)
120824 AFF Amount'
Currt211[ Awl()tllll'
0600 Depth: I(X)83
Day: 14
CuffCn t Ope rat ion'
Rig up 'to run 9-5/8" casing
Drilled 12.1/4" hole with surveys to I0983'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- I'RUDIIOE BAY
November 15, 1988 at 0600 hfs
Rig: Nabors 18E
Well' Y-25 (44-29-11-13)
AFE #
(Investment)
120824
A FE A mou n t'
current Amount'
0600 Depth' 10,983
Day: 15
Current Operation'
RIH with 8-1/2" bit.
Ran and cemented 9-5/8" casing. Tested BOP.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- PRUDIIOE BAY
November 16, 1988 at 0600 hfs
Rig' Nab.Ors 1SE
W, eit' Y-25 {44-29-11 - 13)
A FE #
(Investment)
120824 AI~E Amount:
Current Amount:
0600 Depth: I-0,9-83
Day: 16
· Current Operation:.
Circ and condition OBM
Drilled out to float shoe. Tested casing {o 3,000 psi. Displace well to OBM. Drill shoe,
circ and condition OBM.
STANDARD
ALASKA PRODUCTION
.Daily Drilling Report -- PRUDIlOE BAY
November 17, 198g at 0600 hfs
R,ig: Nabors 18E
Wctt' Y-25 (44-29-11 - 13)
AFE'#
(Investment)
120824 AFl:. Amount:
Current Amount:
0.600 Depth- I I, 151
Day: ! 7
Current Operation:
POOH
Completed displacing OBM. RIft with motor with kick ,pad. Ddited 8-1/2" .ho,lc ,to
11,t51'
STANDARD
ALASKA PRODUCTION
Daily Dril'ling Report.-- PRUDHOE BAY
November 18, 1988 at 0600 hfs
Rig: Nabors 18E
Well' Y-25 (44-29-11-13)
AFE # 120824 AFE Amount:
(Investment) Current Amount:
0600 Depth' 11,250'
Day: 18
Current Ope~'a~ion:
RIH
POOH and moved KICK PAD on motor. R1H and drilled to 11,250'. POOH. R~H wi.d~
rotary assembly.
STANDARD
.......... ALASKA PRODUCTION ......
Daily Drillin~ R¢l)orl -- I'ilUI)IlOE II^Y
(In vestment)
Well' Y-25 (44-29-11-13)
Al:Ii
Current Amount'
0600 Depth: 12,337'
Day' 21
Current Operation:
Drilling 8'1/2" hole.
Drilled 8-1/2" hole with surveys to 12,337'.
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- I'rudhoe Bay [Jni!
November 2~, 19~8 al 0600 hrs
Rig' Nabors IgE
Well' Y-25(44-29-11-13)
AFE# 120824
APl: 50-029-21883
AFE
Current AmOtlilt;
0600 Depth: 13,050'
Day: 22
24- Hour Ftg: 713
Current Operation:
Drill 8-I/2" hole.
Drilled 8-1/2' hole with surveys to 13,050'.
Mud Type: Oil Faze WT: 9
SURVEY MD .ANGLE
82 12662 90.1
85 13009 90.6
VIS:43 PV: I0
DIRECTION
N77.5W
N77.1W
TVD
9015
9012
YP: 12 FL:
SECTION
6691
7037
Solids: 12 Temp: 88°F
COORDINATES DLS
N2622 W6224 ~0.1
N2697 W6563 0.5
STANDARD
ALASKA PRODUCTION
Daily Drilling Reporl -- Prudhoe Bay Unit
November 7.3, lYNN a! ()dO(t hrs
Ri-' Nabors
\Veil- Y-25(44-29-11-13)
A IrE # 12082,~
API: 50-029-21883
A Fi". Am~mrll'
Current Amount:
Current Operation:
Drilling.
Drilling at 13290'.
06(X) Depth' 13290
Day' 23
24- Hour Ftg: 240
Mud Type: Oil Faze
SURVEY MD
WT: 9.1
.ANGLE
VIS: 47
DIRECTION
PV: 15
YP: 15 FL:
Solids: 12 Temp: 86°F
COORDINATES DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- Prudhoe Bay Unit
Noven~bcr 28, 19N8 al ()0()() hvs
Ri,,'
\Veil: 't'-25(44-29-11-13)
AFE # 120824
APl: 50-029-21883
A FE Amot, nt:
Current Amount:
Current Operation: POH
0600 Depth' 13,418'
Day: 28
120 - Hour Ftg:
Drilled to 12,418'. Lost circulation. Spotted LCM pill on bottom. Ran combination
5-1/2" slotted and 5-1/2" solid liner completion. Cemented liner from 11,575' to TOL at
10,721'. Liner lap did not test. Squeezed lap. Lap test broke down at 1700 psi.
Mud Type: Oil faze
SURVEY_ ,MD_
WT:90+ VIS:44 PV: 16 YP: 10 FL: Solids: 12 Temp: 77°1:
ANGLE DIRECTION TVD SECTION_ COORDINATES DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- i~rudhoe Bay Unit
November 29, 1988 al ()6()()hrs
Ri,,' Nabors IRE
Well' Y-25(44-29-11-13)
AFE# 120924
APl: 50-029-21883
A I:F, A
Currt:nt Anlount:
Current Operation:
0600 Depth- 13,418'
Day: 29
24- Hour Ftg:
POH
Squeezed liner lap with 106 sks. Class G. Found no cement at liner top. Lap broke down
at 1300 psi. POH.
Mud Type: Oil Faze
SURVEY MD
WT:9.1 VIS:43 PV: 15 YP: 10 FL: Solids: 14 Temp: 80o}7
ANGLE pIRECTION TVD SECTION {2OORDINATES DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- Prudhoe Bay Unit
November 30, 1988 at 0600 hfs
Ri-' Nabors 18E
Well: Y-25(44-29-1t-13)
AFE # 120824
APl' 50-029-21883
AFE Amount:
Current Amount:
Current Operation: RIH
0600 Depth: 13,418'
Day' 30
24- Hour Ftg:
Squeezed liner lap with 175 sks. class G. Held final squeeze pressure (1700 psi) for 4
hours. Trip for bit.
Mud Type: Oil ·faze
SURVEy MD_
WT: 9.1 VIS:zl4 PV: 14 YP: 10 FL: Solids: 14 Temp: °F
ANGLE DIRECTION TVD SECTION COORDINATES DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- Prudhoe Bay Unit
l)cccml)er 1, 19~8 ;il ()6()() hfs
Ri,,' Nabors l gE
\Vcll. Y-25(,'14-29-11-13)
AFE # 120824
APl: 50-029-21883
A IrE A mount'
Currcn[
Current Operation:
0600 Depth- 13,418'
Day: 31
24- Hour Ftg:
Cleaning out 5-I/2" liner.
Tested liner lap to 3000 psi. Cleaning out inside 5-1/2".
Mud Type: Oil faze
SURVEy ~
WT: 9.2 ~VIS: 43 PV: 15 YP: 9 FL:
ANGLE DIRECTION TVD ~
Solids: 14 Temp: 90°l::
COORDINATES DL$
STANDARD
ALASKA PRODUCTION
l)c¢cmber 2, 19x8 ;1! 0600 hr's
Rix' Nabors lgE
Well: Y-25(44-29-11-13)
APl: 50-029-21883
Current Amount:
0600 Depth: 13,418'
Day: 32
24- }tour Ftg:
Current Operation:
Drilling port collar.
Cleaned out 5-I/2" liner to port collar.
Mud Type: Oitfaze
SURLY ~
WT: 8.9 VIS: 59 PV: 15
~ .DIRECTION TVD
YP: 10 FL:
SECTION
Solids: 13 Temp: 62'F
_COORDINATES DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Report -- Prudhoe Bay Unit
I)ecc:::bcr $, 19,'48 al 0600
Rig' Nabors 18E
Well' Y-25(44-29-11-13)
AFE # 120824
Al'I-50-029-21883
AFE Amount:
Current Amount'
0(~0 Depth: 13310'
Day: 35
72- Hour Ftg:
Current Operation: Mixing LCM pill.
Cleaned out cement in slotted liner to 12700'.
RIH to 13310'. Losing circulation.
Mud Type: Oil Faze WT: 8.9 VIS:60 PV: 16
SURVEY .MD ANGLE DIRECTION TVD
YP: 10 FL:
SEC!7...ON
Solids: 12.5 Temp:
COORDINATES
60 °F
DL~
STANDA-RD
ALASKA PRODUCTION
l)aily l)rilling Report-- l'rudhoc Bay Unit
l)ccc,~bcr 6, 19gg al 0600 hrs
Well- Y-25(4.4-29-II-t3)
AFE # 120824
Al)I: 5(}-(}29-21883
AFE AmounI:
Current Amount:
0600 Depth' 13,310'
Day: 36
24- Flour Ftg:
Current Operation:
POH for perforating guns.
Spot LCM pill at TD. Trip. Ran 5-1/2" scraper to 12,900'. Displaced liner 1o clean oil
mud. POH.
Mud Type: Oil Faze
StIRMY ~
WT: 8.7
ANGLE
VIS: 47 PV: 13 YP: 5 FL:
DIRECTION TVD SECTION
Solids: 10.5 Temp'
COORDINATES
60 °F
DLS
STANDARD
ALASKA PRODUCTION
Daily Drilling Reporl -- Prudhoe Bay Unil
l)ccc~l)cr ?, lg,~t~ at 0600 hfs
Rig: Nabors lgE
Well' Y-25(44-29-I1-13)
AFE# 120824
APl: 50-029-21883
AFE Amount'
Current A~nount:
Current Operation'
0600 Depth: 13,310'
Day: 37
24- Hour Ftg:
POH.
Perforated with drill pipe conveyed guns. POH.
Mud Type: Oilfaze WT: 8.1
SURLY MD ~
VIS: 41 PV: 13 YP: 5 FL:
DIRECTION
Solids: 10.5 Temp: NIA °F
COORDINATES ~
..
STANDARD
ALASKA PRODUCTION
..
l)aily l)rilling Report -- Prudhoc Bay Unit
l,~ccc:lil)er g, 19gg ;il ()60()hfs
Rig: Nabors lgE
Well' x1;-25 (,1.1-29-11-13)
A I:t:. # 120824
,,\l'I' 50-029-21883
Current
Current Operation:
0600 Depth: 13,380'
Day: 38
24- Hour Ftg:
Cleaning pits.
POH perforating guns. Polished TIE back recepticle. CBU.
Mud Type: NaCI2, Brine WT: 8.6
~URVEY MD ~
VIS: PV: YP: FL:
DIRECTION ~ SEC~ON
Solids: Temp:
COORDINATES DLS
STANDARD
ALASKA PRODUCTION
l)aily Drilling Report -- Prudhoe Bay Unit
l)ccc~bcr 9, 19gk¢ at 0(~0(} l~r.s
Rig: Ni~bors I8E
\Veil' Y-25 (44-29-11-13)
AFE # 120824
API: 50-029-21883
AFE Amouat'
Current Amount:
Cu rrcn t Operation:
0600 Depth: 13,310'
Day' 39
24- Hour Ftg:
Running 5-I/2" tubing.
Displaced oil mud with 8.6 ppg NaCI. Running 5-1/2" tubing.
Mud Type: Brine
SURVEY MD
WT: 8.6
ANGLE
VIS: PV: YP: FL:
D.mECTION TVD ~
Solids: Temp:
COORDINATES
STANDARD
ALASKA PRODUCTION
l)aily l)riiling Report -- i~ru(lhoe l;ny Unit
Rig: Nabors IgE
Well' Y-25(44-29-11-13)
AI-:F. # 120824
APl' 50-029-218.3
AFE Amount'
Current Operation:
0600 Depth'
Day:
72- Hour Ftg:
42
Cleaning rig.
Ran 5-1/2" tubing. Set packer. Displaced tubing with diesel. Cleaning rig.
Mud Type:
SURLY
WT: VIS' PV: YP: FL:
ANGLE DIRECTION TVD SECTION
Solids: Temp: °F
~OORDINATES DLS
, [ItOFILMED
DIRECTIONAl.
~URVEY
[~]UIDANCE
[~]ONTINUOUS
r'flooL
RECE VED
Oil & Gas Cons. C0mmissio.;[
~chorage
Company ,
STANDARD ALASKA PRODUCTION COMPANY
I
Well Name Y.-...25(44-29-11-13)(.]....402' SNL...,16,8' WEL,SEC 33,.TllN,R13E)
Field/Location PRUDHOE BAY, NORTH SLOPEr ALASK,,A
Job Reference No. Date
73085 2-JAN-89
Logged By: Computed By:
MCBRIDE KOHRING
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
STANDARD ALASKA PRODUCTION CO.
Y-Z5 ( ~4-2 9-11-13)
PRUDHOE ~AY
NOqTH SLOPE, ALASKA
SURVEY DATE: OZ-JAN-S9
ENGINEER: MCBRIDE
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HDRIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 65 DEG 7 MIN WEST
DATA FROM SURFACE TO 11298.3' ACQUIRED WITH TANGENTIAL METHOD FROM SCHLUMBERGER GCT TOOL.
MWO DATA FROM 2668' TO 13385' ACQUIRED WITH RADIUS OF CURVATURE METHOD FROM MEASURED
WHILE DRILLING SURVEY. MWD DATA TIED TO GCT DATA AT DEPTH OF 11219o3'. DATA HAS ALSO
BEEN EXTRAPOLATEO FROM MWO T.D. OF 13385' TO DRILLER'S T.Do OF 13~18'.
STANDARD ALASKA PRODUCTION CO.
Y-25 (44-29-11-133
PRUDHDE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: 06-JAN-B9
PAGE 1
DATE DF SURVEY: O2-JAN-B9
KELLY ~USHING ELEVAT[ON: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERT[CAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DIG MEN DIG
0.00 0.00 -78.71 0 0 N 0 O E
100.00 100.00 21.29 0 10 S 12 3 E
200.00 200.00 121.29 0 10 S 16 44 W
300.00 300.00 221.29 0 26 S 4 53 W
400.00 399.99 321.28 0 29 S 5 24 E
500.00 499.99 421.28 0 34 S 12 0 E
600.00 599.98 521.27 0 35 S 16 )3 E
700.00 699.98 621.27 0 23 S 11 34 E
800.00 799.98 721.27 0 8 S 19 48 E
900.00 899.98 821.27 0 8 S 22 25 E
1000.00 999.98 921.27
1100.00 1099.98 1021.27
1200.00 1199.98 1121.27
1300.00 1299.98 1221.27
1400.00 1399.98 1321.27
1500.00 1499.98 1421.27
1600.00 1599.97 1521.26
1700.00 1699.97 1621.26
1800.00 1799.97 1721.26
1900o00 1899.97 1821.26
0 12 S 16 27 W
0 11 S 45 22 W
0 13 S 54 22 W
014 S 63 25 W
012 S 72 17 W
0 12 S 81 38 W
0 7 S 78 41W
0 5 N 83 1~ W
0 3 S 61 17 W
0 2 S 71 30 W
ZO00.O0 1999.97 1921.26
Z100.00 Z099.97 Z021.26
2200.00 2199.97 2121.26
2300.00 2299.97 2221.26
2400.00 2399.97 2321.26
2500.00 2499.97 2421.26
2600.00 2599.97 2521.26
2700.00 2699.96 2621.25
2800.00 2799.96 2721.25
2900.00 2899.94 2821.23
0 3 S 41 43 W
0 5 S 49 20 W
016 S 6 BE
0 20 S 13 16 E
019 S 6155
025 S 5 OW
030 S 0 3 W
0 28 S I 4'~ 5
0 34 S 34 8 W
I 50 N 83 44 W
3000.00 2999.81 2921.10 3 48
3100.00 3099.46 3020.75 5 47
3200.00 3198.73 3120.02 8 2
3300.00 3297.42 3218.71 10 22
3400.00 3395.44 3316.73 12 31
3500.00 3492.60 3413.89 14 38
3600.00 3588.85 3510.14 16 52
3700.00 3684.03 3605.32 18 48
3800.00 3778.11 3699.40 20 49
3900.00 3871.03 -3792.32 22 34
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET OEG/IO0 FEET =EET FEET DEG MIN
0.00 0.00 0.00 N 0.00 E
-0.39 0.60 0.1~ $ 0.34 E
-0.51 0.00 0.45 S 0.35 E
-0.79 O.3g 0.97 S 0.42 E
-1.18 0.59 1.81 S 0.46 E
-1.72 0.67 2.79 S 0.60 E
-2.37 0.48 3.82 S 0.84 E
-2.87 0.76 4.61 S 1.03 E
-3.12 0.44 5.00 S 1.12 E
-3.28 0.62 5.26 S 1.18 E
-3.37 0.57 5.52 S 1.16 E
-3.34 0.47 5.79 S 1.00 E
-3.18 0.43 6.03 S 0.70 E
-2.90 0.¢6 6.21 S 0.32 'E
-2.59 0.47 6.35 S 0.09 W
-2.31 0.50 6.42 S 0.44 W
-2.09 0.47 6.45 S 0.69 W
-1.90 0.39 6.48 S 0.91 W
-1.80 0.41 6.50 S 1.03 W
-1.71 0.26 6.46 S 1.11 W
0.00 N 0 0 E
0.39 S 62 22 E
0.57 S 37 31 E
1.06 S 23 11 E
1.87 S 14 11 E
2.85 S 12 13 E
3.91 S 1Z 21 E
4.73 S 12 33 E
5.13 S 12 34 E
5.39 S 12 40 E
-1.67 0.44 6.48 S 1.16 W
-1.65 0.23 6.52 S 1.20 W
-1.76 0.38 6.82 S 1.22 W
-2.05 0.42 7.34 S 1.15 W
-2.36 0.32 7.91 S 1.07 W
-2.70 0.00 8.62 S 1.03 W
-3.03 0.34 9.43 S 1.04 W
-3.33 0.43 10.22 S 1.07 W
-3.60 1.28 11.11 S 1.19 W
-2.11 1.89 11.48 S 2.99 W
5.64 S 11 52 E
5.88 S 9 ,~4 E
6.07 S 6 39 E
6.22 S 2 57 E
6.35 S 0 47 W
6.44 S 3 53 W
6.49 S 6 4 W
6.54 S 7 58 W
6.58 S 8 59 W
6.56 S 9 4.6 W
N 70 20 W 2.66 2.07
N 68 19 W 10.95 2.17
N 68 14 W 22.95 2.34
N 67 5B W 38.99 1.75
N 68 14 W 58.74 2.79
N 67 54 W 82.35 1.88
N 67 4 W 109.41 2.26
N 65 37 W 140.07 1.89
N 65 21 W 173.95 1.78
N 67 14 W 210.90 1.87
6.58 S 10 8 W
6.63 S 10 26 W
6.93 S 10 8 W
7.43 S 8 53 W
7.98 S ? 42 W
8.68 S 6 47 W )
9.49 S 6 16 W
10.27 S 5 $8 W
11.17 S 5 5 W
11.86 S lq, 36 W
10.20 S 7.66 W 12.76 S 36 55 W
7.22 S 15.42 W 17.03 S 64. 55 W
2.80 S 26.59 W 26.74 S 83 59 W
3.15 N 41.51 W 41.63 N 85 39 W
10.56 N 59.85 W 60.77 N 79 59 W
19.36 N 81.79 W 84.05 N 75 40 W
29.72 N 106.82 W 110.88 N 74 27 W
42.03 N 134.91 W 141.31 N 72 41 W
56.16 N 165.71 W 174.96 N 71 16 W
71.02 N 199.53 W 211.80 N 70 24 W
STANDARD ALASKA PRODUCTION CO.
Y-25 C4&-29-11-137
PRUOHOE BAY
NORTH SLOPE9 ALASKA
COMPUTATION DATE: 06-JAN-89
PAGE 2
DA'TE OF SURVEY: 02-JAN-89'
KELLY BUSHING ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATEO VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH OEPTH DEG MIN OEG MIN
4000.00 3962.71 3984.00 24 28
4100.00 4053.26 3974.55 25 34
4200.00 4142.97 4064.26 27 10
4300.00 4230.78 4152.07 29 57
4400.00 4316.0!:3 4237.37 32 57
4500.00 4398.64 4319.93 35 40
4600.00 44?8.39 4399.68 38 31
4700°00 4554.91 4476.20 41 42
4900.00 4627.62 4548.91 44 56
4900.00 4696.50 4617.79 47 42
VERTICA'L OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET OEG/tO0 FEET FEET FEET DEG MIN
5000.00 4762.63 4683.92 49 21
5100.00 4826.68 4747.97 50 5.9
5200.00 4888.67 4809.96 52 18
5300.00 6948.94 6870.23 53 17
5400.00 5008.50 4929.79 53 45
5500.00 5067.23 4988.52 54 6
5600.00 5125.83 5047.12 54 It
5700.00 5184.00 5105.Z9 54 23
5800.00 5244.59 5165.88 51 7
5900.00 5309.48 5230.77 48 12
N 66 54 W 150.78
N 65 4 W 293.21
N 65 41 W 337.37
N 65 47 W 395.20
N 65 19 W 437.37
N 65 10 W 493.78
N 64 52 W 554.09
N 64 31 W 618.44
N 64 31 W 687.07
N 64 29 W 759.54
6000.00 5378.03 5299.32 45 25
6100.00 5449.36 5370.65 44 17
6200.00 5521.16 5442.45 43 59
6300.00 5592.83 5514.12 44 24
6400.00 5664.61 5585.90 44 1
6500.00 5736.59 5657.88 43 52
6600.00 5808.67 5729.96 43 44
6700.00 5880.92 5802.21 43 46
6800.00 5953.37 5874.66 43 27
6900.00 6026.16 5947.45 43 9
N 64 25 W 834.55
N 64 17 W 911.33
N 64 14 W 989.78
N 64 21 W 1069.57
N 64 32 W 1149.89
N 64 30 W 1130.83
N 64 41 W 1311.86
N 64 23 W 1393.19
N 63 57 W 1472.71
N 64 34 W 1548.77
7000.00 6099.27 6020.56 42 48
7100.00 6172.72 6094.01 42 40
7200.00 6246.40 6167.69 42 29
7300.00 6310.23 6241.52 42 12
7400.00 6394.70 6315.99 41 37
7500.00 6469.74 6391.03 41 4
7600.00 6544.71 6466.00 42 0
7700.00 6618.47 6539.76 43 0
7800.00 6690.86 6612.15 44 9
7900.00 6761.91 6683.11 45 15
N 64 34 W 1621.56
N 64 45 W 1691.64
N 65 3 W 1761.25
N 64 51 W 1830.98
N 65 0 W 1900.61
N 65 I W 1970.03
N 64 53 W 2039.34
N 64 40 W 2108.47
N 64 2q W 2177.40
N 64 42 W 2245.97
N 64 33 W 2314.19
N 64 33 W 2382.04
N 64 37 W 2449.66
N 64 40 W 2517.10
N 64 20 W 2583.83
N 64 10 W 2649.93
N 64 21 W 2716.09
N 64 18 W 2783.61
N 63 59 W 2852.59
N 63 41 W 2922.92
1.92
1.15
2.95
2.81
2.90
2.98
3.14
3.47
3.48
1.71
I .48
1.67
1.35
0.49
I .05
0.31
0.60
2.87
3.16
2.82
3.28
1.09
0.26
0.65
0.95
0.50
1.17
1.04
1.04
1.06
1.12
0.74
1.03
1.32
0.81
1.81
1.38
1.43
0.99
2.04
86.41 N 236.36 W 251.66 N 69 55 W
103.63 N 2'75.14 W 294.01 N 69 21 W
122.20 N 315.21 W 338.07 N 68 48 W
141.77 N 358.86 W 355.85 N 68 26 W
163.27 N 406.40 W 437.97 N 6~ 6 W "',~
186.93 N 457.60 W 494.31 N 67 46 W
212.35 N 512.29 W 554.56 N 67 29 W
239.94 N 570.44 W 618.85 N 67 Il W
269.50 N 632.37 W 687.41 N 66 55 W
300.72 N 697.78 W 759.83 N 66 41 W
333.10 N 765.45 W 834.78 N 66 28 W
366.34 N 834.67 W 91.1.52 N 66 18 W
400.40 N 905.35 W 989.94 N 66 8 W
434.91 N 977.30 W 1069.70 N 66 0 W
469.47 N 1049.81 W 1150.00 N 65 54 W
504.29 N 1112.88 W 1230.92 N 65 48 W
538.98 N 1196.11 W 1311.93 N 65. 44 W
573.87 N 1269.58 W 1393.26 N 65 40 W
608.7~ N 1341.06 W 1472.76 N 65 35 W
641.71 N 1409.62 W 1548.81 N 65 31 W
673.2& N 1475.24 W 1621.59 N 65 28 W
703.15 N 15.38.61 W 1691.66 N 65 26 W
732.59 N 1601.69 W 1761.28 N 65 25 W
762.09 N 1664.87 W 1831.00 N 65 24 W
791.63 N 1727.92 W 1900.63 N 65 23 W
W 1970.05 N 65 12 W )
820.93
N
1790.85
850.40 N 1853.60 W 2039.36 N 6.5 Z1 W
879.82 N 1916.15 W 2108.49 N 6.5 20 W
909.39 N 1978.42 W 2177.41 N 65 18 W
938.73 N 2040.40 W 2245.98 N 65 17 W
968.00 N 2102.02 W 2314.20 N 65 16 W
997.15 N 2163.29 W 2382.05 N 65 15 W
1026.15 N 2224.38 W 24~9.66 N 65 14 W
1055.17 N 2285.26 W 2517.10 N 65 12 W
1083.95 N 1345.47 W 2583.84 N 65 11 W
1112.53 N 2405.07 W 2649.93 N 65 10 W
1141.25 N 2464.69 W 2716.09 N 65 9 W
1170.45 N 2525.58 W 2783.61 N 65 B W
1200.54 N 1587.66 W 2851.59 N 65 6 W
1.231.64 N 2650.76 W 2922.92 N 65 4 W
COMPUTATION DATE: 06-JAN-89
STANDARD ALASKA PRODUCTION CO.
Y-25 (44-29-11-133
PRUOHOE BAY
NORTH SLOPE, ALASKA
DATE DF SURVEY: O2-JAN-89
KELLY BUSHING ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH OEG MIN D'EG MIN
VERTICAL DOGLEG RECTANGULAR CgORDINATES HDRIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET OEG/IO0 FEET FEET FEET DEG MIN
8000.00 6831.70 6752.99 46 6
8100.00 6900.79 6822.08 46 32
8200.00 6969.23 6890.52 47 1
8300.00 7037.13 6958.42 47 19
8400.00 7105.12 7026. ~,1 46 54
8500.00 71 74.07 7095.36 45 56
8600.00 7263.61 7164.90 45 43
8700.00 7313.97 7235.26 45 5
8800.00 7385.03 7306.32 44 27
8900.00 1'457.16 7378.45 43 40
N 63 9 W 2994.52
N 63 4 W 3066.77
N 63 7 W 3139.64
N 62 41 W 3213.00
N 62 19 W 3286.26
N 62 11 W 3358.61
N 61 39 W 3430.37
N 61 42 W 3501.30
N 61 51 W 3571.55
N 61 12 W 3640.68
0.98
0 · 93
I .46
1.85
2.51
0.53
1.59
2.08
2.60
0.90
1263.74 N 2714.80 W 2994.53 N 65 2 W
1296.31 N 2779.34 W 3066.78 N 64 59 W
1329.33 N 2844.34 W 3139.65 N 64 57 W
1362.70 N 2909.74 W 3213.02 N 64 54 W
1396.44 N 2974.84 W 3286.30 N 64 51 W
1429.95 N 3039.05 W 3358.66 N 64 48 W
1463.49 N 3102.60 W 3430.44 N 6q, 44 W
1497.15 N 3165.18 W 3501.40 N 64 41 W
1530.34 N 3227.22 W 3571.68 N 64 37 W
1563.29 N 3288.14 W 3640.84 N 64 34 W
9000.00 7529.42 7450.71 43 52.
9100.00 7601.14 7522.43 44 27
9200.00 7672.18 7593.47 44 54
9300.00 7742.39 7663.68 45 ~;3
9400.00 7812.14 7733.43 45 39
9500.00 78~J2.11 7803.40 45 34
9600.00 7951.89 7873.18 45
9700.00 8021.13 7942.42 47 3
9800.00 8087.81 8009.10 48 44
9900.00 8155.59 8076.88 45 57
N 61 2 W 3709.65
N 60 3~ W 3779.15
N 59 40 W 3949.28
N 58 53 W 3920.12
N 57 36 W 3991.29
N 56 43 W 4062.07
N 56 14 W 4132.90
N 55 22 W 4204.06
N 56 23 W 4277.53
N 60 55 W 4350.54
1.64
0.35
1.0 3
2.25
3.31
I .93
1.72
2.61
4.01
4.78
1596.54 N 3348.75 W 3709.86 N 64 30 W
1630.34 N 3409.68 W 3779.41 N 64 26 W
1665.30 N 3470.77 W 3849.61 N 64 22 W
1701.52 N 3532.0'7 W 3920.55 N 64 16 W
1739.09 N 3593.09 W 3991.83 N 64 10 W
1777.69 N 3653.21 W 4062.78 N 64 3 W
1817.17 N 3712.98 W 4133.81 N 63 55 W
1857.89 N 3772.54 W 4205.21 N 63 46 W
1900.0~. N 3833.98 W 4278.96 N 63 38 W
1938.36 N 3896.68 W 4352.17 N 63 33 W
10000.00 8226.92 8148.21 43 38
10100.00 8299.80 8221.09 42 53
10200.00 8373.78 8295.07 41 27
10300.00 8447.92 8369.21 43 24
10400.00 8518.38 8439.67 47 0
10500.00 8584.50 8505.79 50 10
10600.00 8646.32 8567.61 53 17
10700.00 8705.68 8626.97 53 45
10800.00 8764.65 8685.94 53 40
10900.00 8823.46 874~.75 54 46
N 65 7 W 4420.56
N 67 35 W' 4489.00
N 69 55 W 4556.12
N 70 5 W 4622.95
N 69 34 W 4693.65
N 68 45 W 4768.45
N 67 12 W 4846.94
N 69 33 W 4927.29
N 73 39 W 5007.54
N 74 40 W 5087.32
2.59
1.96
2.91
3.44
3.27
3.48
2.11
2
2.88
2.60
1970.06 N 3959.16 W 4422.23 N 63 32 W
1997.46 N 4021.91 W 4490.61 N 63 35 W
2021.61 N 4084.68 W 4557.5~ N 63 40 W
2044.27 N 4147.84 W 4624.25 N 63 45 W
2068.72 N 4214.43 W 4694.79 N 63 51 W
2095.37 N 4284.53 W 4769.47 N 63 56 W
2124.85 N 4357.38 W 4847.86 N 64 0 W
2154.80 N 4432.06 W 4928.12 N 64 4 W
2180.45 N 4508.62 W 5008.20 N 64 11 W
2201.97 N 4586.58 W 5087.77 N 64 21 W
11000.00 8878.80 8800.09 58 28
11100.00 8927.14 8848.~3 63 16
11200.00 8966.86 8888.15 70 23
N 74 7 W 5169.53
N 76 8 W 5255.69
N 77 40 W 5345.32
5.70
5.47
9.38
2224.54 N 4666.74 W 5169.82 N 64 30 W
2246.98 N 4751.31 W 5255.8¢ N 64 41 W
2267.14 N 4840.76 W 5345.36 N 64 54 W
11219.30 ~ TIE-IN POINT GOING FROM GCT TO MWD DATA (SEE INTERPOLATED VALUES FOR CHOSEN HORIZONS).
11300.00 8993.77 8915.06 76 34
11400.00 9014.52 8935.81 79 31
11500.00 9028.95 8950.24 ~4 15
11600.00 9033.33 8954.62 90 25
11700.00 9030.26 8951.55 92 26
11800.00 9026.24 8947.53 92 12
11900.00 9022.60 8943.89 91 57
N 77 46 W 5439.31
N 78 12 W 5534.72
N 78 41 W 5630.95
N 81 21 W 5727.29
N ~2 2 W 5822.94
N 82 5 W 5918.53
N 81 51 W 6014.17
3.48
3.20
6.48
6.27
1.19
0.28
0.41
2287.98 N 4934.69 W 5439.31 N 65 7 W
2308.61 N 5030.30 W 5534.77 N 65 lO W
2328.41 N 5127.20 W 5631.13 N 65 34 W
2345.31 N 5225.55 W 5727.73 N 65 49 W
2359.25 N 53,?.4.51 W 5823.79 N 66 6 W
2373.11 N 5423.47 W 5919.94 N 66 22 W
2387.04 N 5522.42 W 6016.24 N 66 37 W
STANDARD ALASKA PRODUCTION CO.
Y-2S (4¢-29-11-133
PRUDHOE BAY
NORTH SLOPE, ALASKA
COMPUTATION DATE: 06-JAN-89
PAGE 4
DATE OF SURVEY: 02-JAN-B9 '
KELLY BUSHING ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATEO VALUES FOR EVEN 100 FEET OF MEASUREO DEPTH
TRUE SUB-SEA COURSc VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION A~IMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
OEPTM DEPTH OEPTM DEG MIN DEG MIN FEET OEG/IO0 FEET FEET FEET OEG MIN
12000.00 9019.95 8941.24 91 14
1Z100.00 9018.39 8939.68 90 22
12200.00 9018.28 8939.57 89 45
12300.00 9018.21 8939.50 90 22
12400.00 9017.07 8938.36 90 52
12500.00 9015.81 8937.10 90 36
12600.00 9014.79 8936.08 90 32
12700.00 9013.83 8935.12 90 33
12800.00 9012.95 8934.24 90 28
12900.00 9012.17 8933.46 90 24
13000.00 9011.30 8932.59 90 34
13100.00 9010.19 8931.48 90 39
13200.00 9009.12 8930.41 90 35
13300.00 9008.34 8929.63 90 18
13400.00 9007.79 8929.08 90 24
13418.00 9007.66 8928.95 90 24
N 81 29 W 6110.00
N 81 I W 6206.03
N 80 27 W 6302.33
N 79 12 W 6399.03
N 77 33 W 6496.35
N 77 17 W 6594.04.
N 77 29 W 6691.75
N 77 29 W 6789.42
N 77 29 W 6887.09
N 77 29 W 6984.77
N 77 8 W 7082.50
N 76 41 W 7180.42
N 76 39 W 7278.36
N 76 47 W 7376.31
N 76 47 W 7676.27
N 76 47 W 7491.89
0.77
1.00
0.81
1.65
1.87
0.81
0.27
0.12
0.11
0.08
0.43
0.46
0.59
0.80
0.00
0.00
2401.57 N 5621.32 W 6112.84 N 66 51 W
2416.71 N 5720.15 W 6209.72 N 67 5 W
2432.81 N 5818.85 W 6306.94 N 67 18 W
2650.41 N 5917.27 W 6404.58 N 67 30 W
2470.56 N 6015.20 W 6502.79 N 67 40 W
2492.30 N 6112.80 W 6601.35 N 67 49 W
2514.17 N 6210.37 W 6699.98 N 67 57 W
25'35.82 N 6308.00 W 6798.62 N 68 5 W
2557.46 N 6405.62 W 6897.29 N 68 14 W
2579.10 N 6503.25 W 6996.00 N 68 22 W
2601.04 N 6600.81 W 7094.79 N 68 29 W
2623.87 N 6698.16 W 7193.75 N 68 36 W
2646.79 N 6795.49 W 7292.75 N 6~ 43 W
2669.71 N 6892.82 W 7391.78 N 68 49 W
2692.70 N 6990.15 W 7490.85 N 68 55 W
2696.81 N 7007.67 W 7508.68 N 68 57 W
STANDARD aLASKA PRODUCTION CO.
Y-25 C4~-29-11-13)
PRUDHOE BAY
NORTH SLOPE~ ALASKA
COMPUTATION DATE: 06-JAN-89
PAGE 5
DATE DF SURVEY: OZ-JAN-89 "
KELLY ~USHING ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SElf COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 -78.71 0 0
1000.00 999.98 921.27 0 12
2000.00 1999.97 1921.26 0 3
3000.00 2999.81 2921.10 3 48
4000.00 3962.71 3884.00 24 28
5000.00 4762.63 4683.92 49
6000.00 5378.03 5299.32 45 25
7000.00 6099.27 6020.56 42 48
8000.00 6831.70 6752.99 46 6
9000.00 7529.42 7450.71 43 52
N 0 0 E 0.00
S 16 27 W -3.37
S 41 43 W -1.67
N 70 20 W 2.66
N 66 54 W 250.78
N 64 25 W 834.55
N 64 34 W 1621.56
N 64 33 W 2314.19
N 63 9 W 2994.52
N 61 Z W 3709.65
0.00
0.57
0.44
2.07
1.92
1.48
3.28
1.12
0.98
1.64
0.00 N 0.00 'E 0.00 N 0 0 E
5.52 S 1.16 E 5.64 S 11 52 E
6.48 $ 1.16 W 6.58 S 10 8 W
10.20 S 7.66 W 12.76 S 36 55 W
86.41 N 236.36 W 251.66 N 69 55 W
333.10 N 765.45 W 834.78 N 66 28 W
673.24 N 1475.24 W 1621.59 N 65 28 W
968.00 N 2102.02 W 2314.20 N 65 16 W
12~3.74 N 2714.80 W 2994.53 N 65 2 W
1596.54 N 3348.75 W 3709.86 N 64 30 W
10000.00 8226.92 8148.21 43 38
11000.00 8878.80 8800.09 58 28
N 65 7 W 4420.56
N 74 7 W 5169.53
2
5.70
1970.05 N 3959.15 W ~422.23 N 63 32 W
2224.54 N 4666.74 W 5159.82 N 64 30 W
11219.30 ~ TIE-IN POINT GOING FROM GCT TO MWD DATA (SEE INTERPOLATED VALUES FOR CHOSEN HORIZONS).
12000.00 9019.95 8941.24 91 14
13000.00 9011.30 8932.59 go 34
13418.00 9007.66 8928.95 90 24
N 91 29 W 6110.00
N 77 9 W 7082.50
N 76 ¢7 W 7691.89
0.77
0.43
0.00
2401.57 N 5621.32 W 6112.84 N 65 51 W
2601.06 N 6,690.81 W 7094.79 N 68 29 W
2696.81 N 7007.67 W '7508.68 N 68 57 W
STANDARD ALASKA PROOUCTION CO.
Y-25 (44-29-11-133
PRUDHOE BAY
NORTH SLOPEm ALASKA
COMPUTATION DATF: 06-JAN-89
DATE OF SURVEY:
KELLY 8USHZNG ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET Dm SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MTN
0.00 0.00 -78.71 0 0 fl 0 0 E
78.71 78.71 0.00 0 6 S 58 4 E
178.71 178.71 100.00 0 9 S 19 25. W
278.71 278.71 ZO0.O0 0 27 S 5 11 E
378.72 378.71 300.00 0 32 S 0 5'3 E
478.72 478.71 400.00 0 33 S 5 40 E
578.73 578.71 500.00 0 34 S 15 31 E
678.73 678.71 600.00 0 24 S 18 47mJ F
778.73 778.71 700.00 0 12 S 10 7 E
878.73 878.71 800.00 0 7 S 12 13 E
978.73 978.7! 900.00
1078.73 1078.71 1000.00
1178.73 1178.71 1100.00
1278.73 1278.71 1200.00
1378.73 1378.71 1300.00
1478.73 1478.71 1400.00
1578.74 1578.71 1500.00
1678.74 1678.71 1600.00
1778.74 1778.71 1700.00
1878.74 1878.71 1800.00
0 8 S 3 36 W
0 13 S 35 53 W
0 12 S 60 19 W
012 S 72 31W
0 11 S 76 46 W
0 10 S 75 56 W
0 8 S 85 59 W
0 6 S 86 32 W
0 2 S 66 25 W
0 4 N 77 9 W
1978.74 1978.71 1900.00 ' 0 Z
2078.74 2078.71 2000.00 0 4
2178.74 2178.71 2100.00
2278.74 2278.71 2200.00
2378.74 2378.71 2300.00
2478.74 2478.71 2~00.00
2578.74 Z578.71 2500.00
2678.75 2678.71 2600.00
2778.75 2778.71 2700.00
Z878.76 2878.71 2800.00
0 13
0 16
0 17
0 26
0 31
0 25
0 30
I 28
S 87 t E
S 57 50 W
S I 45 W
S 6 37 E
S ? 7 F~
S 2 ~, W
S 2 2~, E
S 2 37 W
S 15 27 W
S 89 13 W
2978.85 2978.71 Z900.00 3 21
3079.15 3078.71 3000.00 5 20
3179.79 3178.71 3100.00 7 34
3280.99 3278.71 3200.00 9 59
3382.87 3378.71 3300.00 12 4
3485.64 3478.71 3400.00 14 23
3589.40 3578.71 3500.00 16 37
3694.38 3678.71 3600.00 18
3800.64 3778.71 3700.00 ZO 49
3908.32 3878.71 -3800.00 22 43
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 0.00 N 0.00 E
-0.35 0.00 0.14 S 0'32 E
-0.50 0.11 0.3:) S 0.37 E
-0.72 0.79 0.80 S 0.42 E
-1.09 0.55 1.62 S 0.45 E
-1.60 0.57 2.58 S 0.57 E
-2.23 0.48 3.62 S O.7B E
-2.78 0.49 4.47 .S 0.99 E
-3.08 0.35 4.94 S l.lO E
-3.25 0.46 5.21 S 1.17 E
-3.36 0.51 5.45 S 1.17 E
-3.36 0.54 5.73 S 1.04 E
-3.22 0.49 5.9'-) S 0.77 E
-2.96 0.37 6.18 S 0.40 E
-2.65 0.52 6.33 S 0.01 W
-Z.36 0.39 6.41 S 0.37 W
-2.13 0.45 6.45 S 0.64 W
-1.93 0.28 6.48 S 0.87 W
-1.81 0.34 6.49 S 1.01 W
-1.73 0.49 6.47 S 1.09 W
0.00 N 0 0 E
0.35 S 66 23 E
0.54 S 43 7 E
0.90 S 27 Z9 E
1.68 S 15 Z8 E
2.6~ S 12 30 E
3.70 S 12 9 E
4.58 S 1Z 29 E
5.06 S 12 33 E
5.34 S 12 36 E
-1.67 0.29 6.47 S 1.16 W
-1.67 0.10 6.50 S 1.18 W
-1.72 0.14 6.73 S 1.23 W
-1.98 0.39 7.22 S 1.17 W
-2.30 0.06 7.80 S 1.08 W
-2.64 0.12 8.46 S 1.02 W
-2.94 0.35 9.24 S 1.04 W
-3.26 0.13 10.05 S 1.07 W
-3.60 0.59 10.93 S 1.10 W
-2.70 2.10 11.52 S 2.37 W
5.59 S 1Z 7 E
5.83 S 10 18 E
6.04 S 7 21 E
6.19 S 3 41 E
6.33 S 0 7 W
6.42 S 3 17 W
6.48 S 5 39 W
6.53 S 7 39 W
6.57 S El 51 W
6.56 S 9 36 W
N 71 36 W 1.34 2.34~
N 68 23 W 8.93 2.18
N 68 22 W 20.21 2.25
N 68 10 W 35.65 2.13
N 68 7 W 55.09 2.26
N 67 59 W 78.73 1.72
N 67 12 W 106.34 2.29
N 65 41 W 138.27 1.87
N 65 21 W 174.18 1.76
N 67 22 W 214.08 1.79
6.57 S 10 7 W
6.61 S 10 15 W
6.84 S 10 19 W
7.32 S 9 12 W
7.87 S 7 54 W
8.52 S 6 51 W
9.30 S 6 25 W
10.11 S 6 3 W
10.99 S 5 ~4 W
11.76 S 11 37 W
10.63 S 6.41 W 1Z.41 S 31 4 W
7.96 S 13.54 W 15.70 S 59 31 W
3.81 S 24.05 W 24.35 S 80 59 W
1.91 N 38.42 W 38.46 N 87 9 W
9.20 N 56.46 W 57.Z0 N 80 44 W
18.00 N 78.43 W 80.47 N 77 4 W
28.52 N 103.99 W 107.83 N 74 39 W
41.29 N 133.27 W 139.52 N 7Z ~7 W
56.25 N 165.91 W 175.19 N 71 16 W
72.26 N 202.47 W 214.97 N 70 21 W
STANDARD AL&SKA PRODUCTION CO.
Y-Z5 (44-29-11-13)
PRUOHOE BAY
NORTH SLOPE~ ALASKA
COMPUTATION DATE: 06-JAN-BO
PAGE 7
DATE OF SURVEY: 02-JAN-89 ·
KELLY BUSHING ELEVATION: 78.71 FT
ENGINEER: MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 ~EET OF SUB-SE~ DEPTH
TRUE SU3-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZTMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
4917.60 3978.71 3')00.00 Z4 46
4128.25 4078.71 4000.00 25 50
4240.38 4178.71 4100.00 28 20
4355.81 4278.71 4200.00 31 38
4475.57 4378.71 4300.00 35 0
4600.41 4478.71 4400.00 38 31
4732.13 4578.71 4500.00 42 48
4873.70 4678.71 4600.00 47 9
5024.80 4778.71 4700.00 49 45
5183.73 4878.71 4800.00 52 6
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERI'TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET :EET FEET OEG MIN
5349.86 4978.71 4900.00 53 23
5519.59 5078.71 5000.00 54 8
5690.89 5178.71 5100.00 54 30
5853.33 5278.71 5200.00 49 19
6000.97 5378.71 5300.00 45 24
6140.96 5478.71 5400.00 44 8
6280.24 5578.71 5500.00 44 22
6419.59 5678.71 5600.00 63 57
6558.47 5778.71 5700. O0 43 57
6696.94 5878.71 5800.00 43 46
N 66 38 W 258.10
N 64 48 W 305.46
N 65 56 W 356.16
N 65 43 W 413.78
N 65 9 W 479.65
N 64 52 W 554.34
N 64 23 W 640.03
N 64 28 W 740.17
N 64 20 W 853.42
N 64 11 W 976.92
6834.85 5978.71 5900.00 43 17
6971.94 6078.71 6000.00 42 57
7108.14 617~.71 6100.00 42 39
7243.82 6278.71 6200.00 42 28
7378.59 6378.71 6300.00 41 43
7511.90 6478.71 6400.00 41 3
7645.90 6578.71 6500.00 42 23
7783.08 6678.71 6600.00 44 0
7923.90 6778.71 6700.00 45 31
8067.96 6878.71 6800.00 46 ZO
N 64 34 W 1109.56
N 64 33 W 1246.70
N 64 28 W 1385.78
N 64 23 W 1513.69
N 64 35 W 1622.26
N 65 I W 1720.22
N 64 50 W 1817.16
N 65 1 W 1914.21
N 64 42 W 2010.58
N 64 41 W 2106.35
8213.91 6978.71 6900.00 47 4
8361.30 7078.71 7000.00 47 3
8506.68 7178.71 7100.00 45 55
8650.07 7278.71 7200.00 45 9
8791.14 7378.71 7300.00 46 35
8929.80 7478.71 7400.00 43 41
9068.62 7578.71 7500.00 44 17
9209.23 7678.71 7600.00 44 59
9352.07 7778.71 7700.00 45 43
9495.15 7878.71 7800.00 45 32
N 64 47 W 2201.33
N 64 34 W 2295.10
N 64 30 W 2387.56
N 64 28 W 2479.26
N 64 25 W 2569.60
N 64 5 W 2657.74
N 64 22 W 2746.92
N 63 57 W 2840.82
N 63 3~ W 2939.93
N 63 8 W 3043.56
N 6~ 12 W 3149.80
N 62 51 W 3258.01
N 62 13 W 3363.40
N 61 51 W 3466.02
N 61 42 W 3565.35
N 61 14 W 3661.21
N 60 47 W 3757.28
N 59 36 W 3855.76
N 58 29 W 3957.19
N 56 4t W 4058.66
1.62
I .22
2.71
3.17
2.45
3.14
3.43
2
I .82
0.66
0.50
0.52
2.25
2.83
3.34
0.44
,0.74
0.61
0.61
1.09
I .42
0.94
0.80
1.16
0.71
1.37
1.19
1.26
1.57
1.30
1.22
1.37
0.41
3.49
1.77
2.08
2.08
1.46
2.43
1.87
89.30 N 243.09 W 258.97 N 69 49 W
108.82 N 286.24 W 306.23 N 69 11 W
129.89 N 332.35 W 356.83 N 68 39 W
153.50 N 3.~4.92 W 414.40 N 68 15 W
180.99 N 444.78 W 480.19 N 67 51 W
212.46 N 512.52 W 554.81 N 67 29 W
249.23 N 589.93 W 640.41 N 67 5 W
292.38 N 680.30 W 740.47 N 66 44 W
341.26 N 7:~2.47 W 853.64 N 66 26 W
394.80 N 893.77 W 977.08 N 65 10 W
452.15 N 1013.38 W 1109.68 N 65 57 W
511.12 N 1137.20 W 1~46.78 N 65 47 W
570.68 N 1262.90 W 1385.85 N 65 40 W
626.61 N 1377.95 W 1513.73 N 65 32 W
6?3.53 N 1475.86 W 1622.29 N 65 28 W
715.27 N 1564.49 W 1720.24 N 65 25 W
756.22 N 1652.36 W 1817.19 N 65 24 W
797.38 N 1740.25 W 1914.23 N 65 22 W
838.16 N 18Z7.57 W 2010.60 N 65 21 W
878.91 N 1914.24 W 2106.37 N 65 20 W
919.62 N 2000.05 W 2201.34 N 65 18 W
959.81 N 20.,94.78 W 2295.11 N 65 16 W
999.52 N 2168.28 W 2387.57 N 65 15 W
1038.85 N 2251.12 W 2479.26 N 65 13 W
1077.80 N 2332.64 W 2569.61 N 65 12 W
1115.94 N 2412.11 W 2657.74 N 65 10 W
1154.58 N 2492.50 W 2746.92 N 65 8 W
1195.3!3 N 2577.08 W 2840.82 N 65 6 W
1239.20 N 2666.01 W -7939.93 N 65 4 W
1285.80 N 2758.63 W 3043.57 N 65 0 W
1333.93 N 2853.42 W 3149.82 N 64 56 W
1383.41 N 2949.74 W 3258.04 N 64 52 W
1432.19 N 3043.30 W 3363.45 N 64 47 W
1480.37 N 3134.07 W 3466.11 N 64 42 W
1527.41 N 3221.75 W 3565.48 N 6~ 38 W
1573.21 N 3306.18 W 3661.39 N 64 33 W
1619.59 N 3390.56 W 3757.52 N 64 28 W
1668.59 N 3476.39 W 3856.10 N 6~ 21 W
1721.00 N 3563.89 W 3957.67 N 64 13 W
1775.79 N 3650.32 W 4059.34 N 64 3 W
COMPUTATION DATE: 06-JAN-89
STANDARD ALASKA PRODUCTION CO.
Y-25 (44-29-11-133
PRUDHOE BAY
NORTH SLOPEr ALASKA
DATE OF SURVEY: O2-JAN-89 ~
KELLY BUSHING ELEVATEON: 78.71 FT
ENGINEER: qCSR[DE
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZTeUTH
DEPTH DEPTH DEPTH DEG M[N DEG MTN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/VdEST DIST. AZIMUTH
FEET DEG/IO0 ~EET FEET FEET DEG MIN
9638.48 797E.7! 7900.00 45 49
9786.20 ~078.7! 8000.00 48 54
9932.90 8178.71 8100.00 44 45
10071.14 8278.71 8200.00 43 8
10206.58 8378.71 8300.00 41 29
10342.9Z 8478.71 8400.00 44 55
10491.00 8578.71 8500.00 49 52
10654.50 8678.71 8600.00 53 36
10823.73 8778.71 8700.00 53 39
10999.83 8878.71 8800.00 58 27
N 55 33 W 4160.14
N 55 49 W 4267.28
N 62 25 W 4373.91
N 66 53 W 4469.32
N 70 7 W 4560.46
N 69 51 W 4652.73
N 68 49 W 4761.59
N 68 8 W 4890.73
N 74 25 W 5026.43
N 74 7 W 5169.38
1.51
2.90
4.64
2.27
2.34
3.70
3.46
2.84
2.57
5.70
1832.61 N 3735.85 W 4161.13 N 63 52 W
1894.28 N 3825.35 W 4268.67 N 63 39 W
1949.46 N 3917.29 W 4.375.5'7 N 63 32 W
1989.84. N 4003,73 W 4470,95 N 63 34 W
2023.10 N 4088.7H W 4561.91 N 63 40 W
2054.50 N 4175.93 Vd 4653.96 N 63 48 W
2092.88 N 4278.12 W 4762.61 N 63 55 W
2141.60 N 4397.89 W 4891.61 N 64 2 W
2185.71 a 4527.00 W 5027.04 N 64 13 W
2224.50 N 4666.59 W 5169.67 N 64 30 W
11219.30 *** TIE-YN POINT GOING FROM GCT TO MWO DATA (SEE INTERPOLATED VALUES FOR CHOSEN HORIZONS).
t1239.55 8978.71 8900.00 74 41
13418.00 9007.66 8928.95 90 24
N 77 10 W 5382.13
N 76 47 W 7491.89
8.89
0.00
2275.32 N 4877.5~ W 5382.14 N 64 59 W
2696.81 q 7007.67 W 7508.68 N 68 57 W
SCHLUMBERGER
O I RE C T I ONAL, SUR V E Y
COMPANY
STANDARD ALASKA PRODUCTION
WELL
Y-2S (44-29-i1-13)
FI ELD PRUOHOE BAY
COUNTRY USA
RUN ONE
DATE LOGGED 02 - JAN - 89
REFERENCE '7308S
WEL'L' Y-25 (44-29-11-13) HORIZONTAL PROJECTION
(1402' SNL, 168' WEL, SEC 33, TllN, R13E)
NORTH
80O0
SO00
4000
2000
-2000
-40OO
-8000
HEST
REF 7308S SCALE : 1/2000 IN/FT
-10000 -8000 -GO00 -4000 -2O00 0 2000 4000 6000'
EIqST
WELL' Y-25 (44-29-11-13)
(1402' SNL, ~68' WEL, SEC 33, TllN, R13E)
VERTICAL PROJECTION
-4000 -2000 0 0 ZOO0 4000 6000 8000 10000
...L.,..+..; ....... ?'..+.+..'; ....... ;..+..L.~...4...~...,...~...~ ....... t..+..,...+...;...,...+..';...-:.. ....... t...t.-+4:..-H---?--:----.:'.-.-t-.-?---;.--:--.?---bt---:--+.-t ....... H---b-H~---4.--?:.'---~---
· .-~-~...L~.' ...... ,:-.L.&. ,i ...... g .g .L.I._L ~ ..~...L.2 ....... ,'...L..L..;...L-;...L..g...4 ....... L-4...4.-4...L..;...4...4...4...~ ...4...4...4...4...;...4...4..-4...4 ...... 4-..4...4--;.-.&-g-.-4.-.g...g ....... 4.-.;...~..-.';...4..-~...~.--z....,': ....... g..-4...4..-g.-.½..4...L..g...g ....
· ' }'"7 ......... '*'-..*....b..'f.'. [...e....-~....~...*...4....~.-..~.-.~--.~. ........ ~.......~.....>....t....,....~..-~..~~.. r..~....~..,.,..-~...-t.....,.-.?..~...-.? ....... ?-..?...?.-?--?..-?...?...?-..} ....... ?...?...?.-?...4.-...:-.-.?--.?-.-.:.-- ~---?.-.?.-?---?.--?.?---?-.. t--? ....... ?"?"?'"?'"t"'?"'?'"*"'? ....
? : : ~ ~ L {; ~ ~ i; I; i.; 4 ...... ~;....;....L.L-i... L..L.L.L.L.~...~....i..4...~ ....... ~.....:...S..l,.'...s....;...;...~......: ...... L.S....;.-I,:-.-.*'...~---~---S-4--4--4.---;---.;--* ....... ;---;---S---; ....... ;.-~'--.L-~-.4--~.-4-..*.--;
...&...[... 4 .~, ....... .L...L.-;...+ ....... ;....}.-*.-..}.---~-+..~,...H-4 ........ ?"--;'--'H'-;'"-I'-'-H-H-H-? ...... H-4-'-4.-.H-H4----.;'-q---t ....... ?'-?---~---?t";.l-'?-?""~ ....... ?---.r--?---? ...... ?'"7"'?'"':""'q-".r"!"l'?-'?."'t'"?"'?""r-.~ ....... ':l"--V"V'?'"t'7"'?'"?'"?
""?'"'r",'"?. ........ ;"'~'"':"'~ ...... r-r"r": ....... :'"':'""r'l; ...... ;'!~lI: : ~ ~ ~ : i ~:: : ~ ~ ~ : : i ~ s , ~ ~ ~: ~_~ i: :.~ i.~..:~ i: ~ ~._L.._i :..~ ~..I.i...~..:..: ....
!ii~ ii ; i i~:~i i i i. i:;~. ~}I, i iii,.i._i..i..~ ....... LL.LL'...LLL.[ ........ LL.i...LL:...LLL:...LLL~...'...LLL: ...... :..-L-LLi-:...L:...: ....
:I ~:i i:: 'i i]:::i::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ]:::Z:~]:::~::L~..-!...i ....... bbbb!...;.:--~..: ....... :...~...~.-.~..+.-:...~...bb~-.bb;.-.b!...~...;...~..~ ....... b!-..bb,.--b:.-.b~ ....
. . ? . . ~ · , : : . : . . : ~ : : , : : : ~ : : : : ~ : : . : .... ~ . : ...... ~ .... ~ .... : ........ ~ ....
~.-.;...~.-.H½ ....... Hr..},..? ......
;.,...,...~ ....... ~ ,..,...~ ...... ,...~...m...~...:...:...:..*...:~~..*...~..~ ..... , ....... ~.H....~...~..~..., ....... ,..~...~...m ....... ~_.~....~ ............ ~ ........ ~.+.~...~...~...~ ...... ~...~...~...,-+..,.+.+..~ ...... +..->..+++..,..+.~...~ ....
.... i''~'llj'''J''l~''''h+'''h't''':'''t''+''t''''h+''t'''t'''?'~....... r'~--?%r-t-'-'h"~"-h'F-t'"t"-t-'"h-?~""}"'h't ...... ,"'r"r'-?"-?"'r'?"';"-'; ...... :"-:---r--?'"?'-'?"-r'?"? "T"?7'"?'T"??"T'-} ....... F-F'FYT"Y'?"F~ ....
' ~ O ']]] I I j
'"t ..... ~"'7 ..... t"-?'? :
· .H ....... , ...... ~ ................... . ......................................... ~ ..................................................................................................... ] ....................................... 4...~...;.._~-.~...~._~..4_~ ...... ~...:...~_~ ....
.,:..,,:.._:: .......... ,...:...: ....... ~...~...~...~ ....... ~.~-~;~.~;~:~;~:~:.~:~:~:~:~.~; ....... ~...;...~...~..+..~..~..-~..-¢...-:-~...~-..¢-..¢...~-..;...~...~..-~ ..... ;..-;...;..-~+~...;...;...; ....
4 ~ $ 4 ..... H.;-~..-; ....... 4...4...i...;......L4..&.; ...... 4..~;~..;~.~4"~.~;..4~.~"~;...;~-+..;.~.4~-b.4...q~4~.~4..+~.4-~..4..+~4.~4 ....... 4..+..4.-.4-]-..4..-4---4---4.--;--+-+-+d-d--+-+-+-+-;--~.--h+.-f--T-f-+-%t ....
-4 ..... & ~: ...... I * & J~ i ~ ~ ~ Z & * & ~ ~; ~ ....... z ;.~z .;x~; , 4 z z _;., ~ z , L,~ ~ _;_z.. ;. 4-4 .~....;...4...,..4....;...~ ....... 4.-4-.-;...;...4--.4-.;.-.;..4 ..... ~.--;--.&...,-.+..;-,.-;.-;: ....
................................................................................................
: t ~ . ~ : , ; : : : : : : : : . : : : : : : .... : : . · : . · : ............ ~ ~...; ..... ....'..........t..~....L..~..~ ...... 4.._;_.;...4...4...;...4...4...4 ....
t t ? ? ? ....
..4...;..,. ;.. ¢ [..-~..~ ....... 1...;..;...;. [..;..~. ~..;; 4., .-b.¢..b-~ ....... }~.b..;..i--+..;..4...~.-.:...HH...H-.4.-4..+--.~ ....... +....b.}-b-4-...~...H---~ ....... H----b-~--.*---H--.-b4--~.-+--b+-.4..+.-H.-+--~ ....
' t I ' : ~ : ~ ~ : ; ; ~ ~ : ~ ~ ~ : : : : ' : ~ : ~ : ~ .... : : : : : : : : : : : ' , : : : : : : : ' : :...L.4 ..... ~.-~..;...L.-;.--*---L..~...~ ....
· .-4.-* ....... + ...... H~"+" ~ ....... ?-+'"* ....... t'"?"?~ ....... ?"W"l*"'*"4'"~ ....... ?r.. hA~.~..~-..t.--??-?-? ...... ??---??J---???-~ ....... ??--??j.-??-??-[-'-?"??'-~ ........ ?'"~ ...... ~ ....
-.L.L.{...; ..... ,...&4...; ....... ;...~...;...~...;...;..~.~4 ....... ~...~..&.~..4...;...~...~.~...~%4.4~..4...~..4..:~.~...~...~..4...~..*..+.4..4-4...~ ....... =..;...;-~-f-~---~---;---4 ....... *--&--&-* ....... ~--~--.4.4 ...... ~---b-~.--*--.~.+-4-++-.
..4..-t...t..4 ...... H'4'"; ...... 4'"+"'4'-'4"i'"4'"4'~ ....... 4-H"4'-H'-4-H'- ~~'~"-'H"H"'h4"'4"H ........ ~.aTt~at;-.-t--.S~-Ti-O~~...hh~H---H---H ....
-.;-.~ ....... 4...q.-4..~..t..4...~-..;-.+.+.+-.4.-~.-4 ...... +....~.+.-4.-.4..+.+-.4..+--~---~ .... ~-.+-+-t.t..4~---4 ....... +.+.-4--4-.-].--4-+-+---~ ...... ~--+--4.-+-4.-+--t--+-+--~.+-+-+.-~..--+-+-+-+.:.-+.-h+-+--f--f-+-4-~ ....
· ..;.1.L.L~ ...... ~-&..-;...~ ...... L.~l..*.-.~...4...;..-~...&-..~ ......... b"~"'4"'+ ...... 4"'4"+'d ...... H4-'4--4 ....... 4"'4" b'+ .... ' ' '--'4-'4"-4--H4'"'~ ....... 4--.4-.-4---H4'-'4--'4'-4"'H "-4'"4"-4-'-H4"-H4"'4"-~--"+'-~"'H4"+'+"HH+ ....
..:...Ll.~.A ...... L.L.-L.& .... L~...L-&.--~-..~...~.~& ......... ;-...;.--~.-.~-..L~-..;.---;--~ ...... ~...~-4---~-.L.~].~...~--.;--.;...~---;.--4 ........ ~-'.~---4--4'"4'--4"'4"4'"+ ...... H4'"4'"4"'4"'H~"4-~ ..... 4"-b+"4'-4"+-4'"4-4 ....
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ..... ~ L~....L~ ~ ~ L.Ll~...~-L .L~ ~ ~.~.;...~.&..;~-;...~.L.~-.b.&~-~ ~--.;-~.~..4.~`..~.~".;...;-..~-;..4...;..4-.;...~...~..~-....~..~-;.~...f..;...~...~-
"? "] ..... i ..... ?T"~ ......
-+"r'-?, ....... r"~"'?"'* ....... ,'"??, ....... ,"?~ ........ ?'?"'?'r", ...... ,"- ..... ,'"~'",'"~"~"'*"'*"-~-'* ...... ~---.~?-? ....... ~-.-?-,-~--.-~.--?-; ...... ??.--?-.--F+-+-H-'4--~-','--,-',--,'--,---,---,-'-,---,--'
-;-,~- ~-~4
..?l;...T..? 1..,.?.~..., ...... +...?..?~ ....... ?..?~, ....... ?'"r";"'?"';"'~"':"'?"~ ...... ?'"?'"?"'~'t"Y"T--r';"" ~~4-';"'?"'?'"' "~'"?'"?'-F'??'"?"'?'-?-:-T'?"?-?"]"';'"T"T'q-q"q3"T-T"?'P?"T~ ....
· ','-ht--r';'"f++'~ ...... f"t'"f-'~ ........ ~---~'~ ....... ~'"~"?"~"i'"~"?"~"~ ...... r-?'~?i-'-~---'~-'?"~ ..... ~~'~'~'!i"~a~"~:~a'~a?T:"?"FY~-~"TTT'TT'?'r~ ....
..4..{.H..~...?~..i.4...
· 'T'T"yT'2 '"[ ;'~"'~ ..........
· "' .... *"'~ ........ *"~ ......... ?"."'T"~ ......
- 4 * .~,,~ ~ , ...... , ..,...,., ~ ~ 4 ~ *.-*.-.~..-~ ...... ~---~-'-~---~ .... *.--~'--~--~ .......... ~ *-'~' t' ? · . '~ .....
~ : [ i . . , , : : : : . : · : : , : , .........
.... ~ · ~ ......
'l'~.... ]l':~'['~ I I: *ll]'' 'I[ ll' * 'l:
~ ' : i : i ~ ~. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ; [ : .... :.~...: ...... 4...&.4...4...I.-.L..=-~,.-~ ........ ;...;....;-..:-.-.,--;---~.--~--.~ ........ ;...~-.;...-;.-L..~...~...~--~ ..... ~..4...~...&.'...L-.&.4.~...~
· .4-.~-..4..-~...~..~.-.~.-4...4... "';..'H~"~ ...... ;...4....~...; ......
~ ~ r~ ~ ~i~ · ~~ ~I;;~~~.~..~U...~.LLU ....... ~]...~..~;.~.~LL LL~LLL..LLL
· ~.'-'~ '~ ...... ~"m"~ ..... ?"~ ................
......... ,. .: · .......... ] ............... ,,,... .......... · ......... , ...... ....~...~-~ ..... ~.-m..] ...... Z...~ .......
i. +..~...~._~ ....... L4..4...~ ...... ~...I...~...~ ....... ~...~...~...~ ......... ~.~. ~f-+.+-b-- ~--+--~.-.~+-~-.+.+-P-+ ...... +--+--+-+--t'--H-+-+'-? ........ }-+'"~'"?"T'"r''?''?~ ........ ~"'?r"?"???'"?v' "T-F'?'"?"'T"?'"~"'?"'~"'I
I ~ i ~ i i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i i [ ~ ~ ~ ~ ~ ~ ] ~ ; ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ; ~ ~ ~...~...~...~.z_ ..~..-~...~-i ...... ;..,&.~..;...
..~...~..-~..-~ ...... ~--~.~--.~..-%...~...~
'--t'l-w'~ ..... ~","!"', .....
T"~"'+ .......... ..~.T..r-...~.-.~...?.'?'-,.'???? ...... ?'-??-'?-.--?'??'?' ?"T"??~"'7"?7"t'";'-T"T"T"%'.'"?"'T"?"'~ ...... %'T"T"?'"' "Y'%'~' ~'" ~ : ~ , ~ ....... ' : : : :
.+4-; ~--~-4 ...... ~ ..... +..4-4.-4 ...... H;...~..4 ...... ;-.4..-4--4..+.-;-~-4--4 ..... 4-+---4.-4---4--+-4-+--+ ...... f-+.+-+.-~-+--+-4-+--.---~---f--~----h.4.---h-2---f--~ ...... f'-f--~.--?'t-'-~---f--f-~-'~--'f-h-f-'f"~-f"f"f~'"
.... f ..~.-i' "~ ...... t .'ff''~"'~"'t
-.f."~'-'f"-t'""4--ff'"'h+'t"++ff'"~"'~"+++'+"["+'+'+"+ ....... t-+..f.-ff- -f-f--ff..t-+-t-ff--%~ ...... f"f"f"f't"? r'r"~ ....... r'y'"r"r'l'"'r T'T": ...... T'T"T'T'T T T"F F ~ "T'-F T-? T'T'T'T"F'I
,- l~...~...~ ....... *-~'-~..'*-~ '"~ .......
"'?"t'i'"~ ....... f'i'~H1
q.44..~ ..... ~4..~...L~..4...~...~.4....4.4.44 ..... .b..~..4..4 .... b~..4.4 .... b~--b4--H---~-4---~---H-+.H+H-.4 ....... F-H-.H----~--H.4--,-.-H---H-{-.-H.+H-.H--H--4-4.-+-f-~---~
...~ .... ,.4 ...... .~..4..4...I...~...*...~...~...~ ...... ~--~-..~.-~ ...... H.~..+.4--.i.-4..+-4-.4 ..... HH.--4.-+4.-+-4--~ ....... +.-+-+--~ ...... +--+--f--.~ ....... f--.h-t----h'~----h--~---t'"f-'-f"f'-i"'f"r"f"~-'f'%~"'f'-h"h'~ ....... ~"m-r"r"~
"r" ...... + '.+-f....+.-4.-.4 ....... -~ ?- - ~ ~ ~ ~ 1
...T~-..?--? ...... ,-74-.~..-1."~..-??: ..... T'"v?'~ ..... : .? .... ;- ; ..... . , ~ : ~ ~ ........ · ..... : . : ~ ............ i
~ ~ 4 . ' · '. ' .... b. '.--~.-.4 - -- 4 4 4 4- 4 4 4- 4 4 ~ -;-. 4 ---4--- '--4-.-4 ...... 4-.4- 4 ·; ..... 4-- ;---4---4 ....... ~---4..--~---~--- :---~.-~----~...4 ..... 4--4--.4--.4--' -..4---/-.4---4 .... 4 -4..-4 - 4
' ~ ]: ~ :~i;' ii i ~ ~ ~ -~ ~ i ~;; ~ ~ ~ ~ ~ ..~.L.~..L. ~.~ ~.L~...L.L~...; ....... ;...~--.L~--b.;..--;---~.--;]---~---~-.-~---H---~--.~.--~--.~---~
.... ~...'...L..~ ....... *-??4 ..... *'"~'"~'"~ ..... ??"T'~ ...... ~.?...?~ ...... ?...??..~ ......
,..+..{..4.i ..... %~d'" "4'j'-~--~"'"~-~'"?~'4"%"t":{-~"'f"t"-t ...... t-"t-"t-'-t'-{'--t---~-
..... ~..+...~ ...... ~-~ ....
I ZOO0
295.
PROdECTION ON VERTICAL PLANE 29S. - I IS. SCRLEB IN VERTICAL DEPTHS HORIZ SCALE = 1/2000 IN/FT
GREAT LAND DIRECTIONAL DRILLING INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
mm~mmmmmm~m~mmmmmmmm~~~~~~~~~
STANDARD ALASKA PRODUCTION COMPANY
COMPANY
WELL # Y-25
WELL NAME
PRUDHOE BAY
LOCATION
AL1188-D39 SINGLE SHOT & MWD 11/29/88
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
JOB NUMBER TYPE SURVEY DATE
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmemmmmmmmmmmmmmmmmmmmmmmmmmmmm
NAME TITLE SIGNATURE
110 FT 13418 FT
DEPTH INTERVAL
FROM TO
lO/3O/8~ 11/25/88
DATE SURVEY TAKEN
FROM TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL
WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR
FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO
DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE
FORWARDED TO YOU ON WRITTEN REQUEST. ALL SU.R~V~,YS ARE
CONFIDENCE. !~ ~ ~ ~' ~
~ t,--~ -3.1~e~.~ .
..~
GREAT LAND DIRECTIONAL. DRILLING,
C]Jent .............. : STANDARD ALASKA PRODUCTION CO.
We]] ................. : Y-2S
Vest,ca] Section at.: N 75.00 W
Magnet~.c Declination: 3]. de~ 30 mJn E
Data fJ]e name ...... : B:PY25D.DAT
RECORD OF SURVEY
(We]] assumed vest,cai to MD of
ComputatJ. on: RADIUS OF CURVATURE
Survey date- ].].-29-88
Method ..... : SINGL.E SHOT & MWD
RKB Height.: 78.? ft
1].0.01
].]./29/88
MEAS DRIFT TRUVERT SUBSEA SECT ION
DEPTH DG MN DEPTH DEPTH DIST
DIRECTION RELATIVE COORDINATES
ANGLE FROM WEL.L.-HEAD
I10
445
978
1380
19_1.2
0 0 110.00 31.29
0 45 444.99 366.28
0 1S 977.97 899.26
0 ].S ].379.96 ].30]..25
0 1S 1911.96 ].833.25
0.00 N 0.00 E
-]..].9 S ].8.00 E
-1.90 S 30.00 W
-1.16 S SO.O0 W
O.68 N 2.OO W
0.00 N 0.00 E
2.09 S 0.68 E
6.58 S 0.21 E
7.9]. S 0.92 W
?.:].S S 2.62 W
2668
2848
2942
3006
3].00
0 30 2667.94 2589.23
1 0 2847.93 2769.22
2 24 2941.88 2863.17
3 36 3005.79 2927.08
S 36 3099.49 3020.78
3.79 S 2.00 W
4.66 S 74.40 W
7.30 N 77.80 .W
].0.65 N 7]..50 W
].8. ].5 N 66.60 W
7.].S S S.84 W
8.88 S 7.20 W
8.97 S 9.96 W
8.08 S ].3. ].9 W
S.39 S 20.23 W
3].94 7 42 3].92.85 3].].4.].4
3289 ].0 6 3286.70 3207.99
3383 ].2 0 3378.95 3300.24
3478 14 0 347]..S]. 3392.80
3573 16 12 3563.23 3484.52
28.92 N 67.00 W
43.49 N 68.00 W
6]..38 N 68.30 W
82.S7 N 66.90 W
107.OS N 66.20 W
1.].0 S 30.24 W
4.53 N 43.8]. W
11.23 N 60.53 W
19.37 N 80.29 W
29.22 N 102.99 W
3677 18 6 3662.60 3583.89
3762 19 S4 3742.96 3664.25
3856 21 42 3830.83 3752.].2
3950 23 ].8 39].7.67 3838.96
4043 25 6 4002.S0 3923.79
].37.24 N 63.80 W
].64.40 N 64.].0 W
197.27 N 65.90 W
232.83 N 66.60 W
270.48 N 65.S0 W
42.].8 N ].30.78 W
S4.33 N 155.64 W
68.44 N 185.89 W
82.93 N 218.82 W
98.40 N 253.66 W
4174 26 24 4120.49 404]..78
4301 30 6 4232.34 4].53.~3
4427 33 S4 4339.].8 4260.47
4554 37 18 4442.42 4363.7].
4680 41 0 4540.12 4461.4].
326.53 N 64.S0
385.65 N 64.80
451.32 N 64.S0
S24.00 N 64.S0
602.12 N 63.80
122.45 N
].48.].8 N
176.77 N
208.59 N
243.27 N
305.24 W
359.55 W
4].9.88 W
486.60 W
S58.17 W
CLOSURE
DISTANCE DG MN S
0.00 N 0 0 0 E
2. ]9 S 18 0 0 E
6.S8 S ]. 47 2]. E
7.97 S 6 36 ].7 W
7.62 S 20 7 58 W
9.24 S 39 ].4 .1.1 W
].]..44 S 39 2 ].2 W
13.40 S 48 0 59 W
].S.47 S S8 30 44 W
20.94 S 75 S 30 W
30.26 S 87 55 ].3 W
44.05 N 84 6 8 W
6]..57 N 79 29 22 W
82.60 N 76 26 2 W
107.06 N 74 9 36 W
137.42 N 72 7 28 W
].64.86 N 70 45 24 W
1.98.09 N 69 47 ].8 W
234.01. N 69 14 41W
272.08 N 68 47 S1W
328.88 N 68 8 27 W
388.89 N 67 36 6 W
455.57 N 67 ].0 9 W
S29.42 N 66 47 48 W
608.88 N 66 27 4 W
DOG LEG
0.000
O. 224
O. 094
0.000
0.000
0.033
0.278
1.490
1.875
2.].28
2. 234
2. S27
2. r'~,~
1. 840
2. 118
1. 933
1.706
1. ~47
1. 004
2.9].4
3.0].7
2. 677
2. 946
Y-2S
RECORD OF SURVEY
NEAS DRIFT TRUVERT SUBSEA SECTION
DEPTH DG MN DEPTH DEPTH DIST ANGLE
4958 48 S4 473~.71 4458.00 794.49 N 43.40
S179 $2 0 4877.42 4798,7]. 94].,40 N 43.40
$461 S4 4 S044.92 4948.22, 1182,15 N 43.40
S6].9 S4 18 S139.3S S040.44 ].307.8]. N 44.00
S843 49 24 S277.47 S].98.94 1480.S0 N 43.40
DIRECTION REL.AT IVE COORDINATES
FRON WE[.I...- HEAD
330.S3 N 733.94 W
404,82 N 884.32. W
507.72 N 1087.81W
S44.S0 N ].202.49 W
442.S2 N ].340.S4 W
S969 45 42 S342.70 S283.99 1571,S0 N 43.10 W
6].54 44 ].8 S493.S1 S414.80 ].499.S0 N 63.].0 W
6343 44 0 $629.].2 S550.41 ].828,22 N 42.70 W
4532 43 S4 S745.19 S686.48 ].956.31 N 42.40 W
672]. 43 48 S90]..49 S822.78 2084.17 N 42.70 W
684.34 N ],443.56 W
743.SS N 1540.22 W
803.52 N ].477.42. W
843.98 N ].793.82 W
924.34 N 1910.01 W
7005 42 48 4108.18 4029.47 2274.35 N 42.40 W 1014.12 N 2082.85 W
7394 4]. 42 4394.].2 43].7.4]. 2529.40 N 62.00 W 1,1.36.11N 23].4.21W
7641 42 30 6579.38 4500.67 2691.19 N 43.40 W 1212.05 N 244]..34 W
79S4 4S S4 480S.18 4724.47 2904.02. N 62.70 W 13,1.1.S7 N 26S7.08 W
8239 47 ].8 6999.42 4920.9,1. 3].04.63 N 62.00 W ].406.99 N 2839.22 W
8492 46 0 7].73.29 7094.S8 328S.S1 N 61.00 W ,1.494.77 N 3000.89 W
8449 4S 12 7283.].3 7204.42 3394.].9 N 60.30 W 1S49.7S N 3098.67 W
8806 43 S4 7395.02 73].4.31 3500.42 N S9.90 W ].404.45 N 3194.14 W
9059 44 24 7574.55 7497.84 3670.31 N 58.80 W ].494.49 N 3345.75 W
931]. 4S 36 77S4.73 767G.02 3840.47 N S4.70 W 1789.S7 N 3494.44 W
96S7 44 12 7995.52 79].4.8]. 4073.85 N S3.20 W ].932.24 N 3499.8]. W
9910 45 12 8,1.72.22 8093.51 4246.33 N 41.70 W 2029.57 N 3852.30 W
10158 42 12 8351.49 8272.78 4415.40 N 70.40 W 2099.05 N 4008.72 W
10323 44 42 ' 8471.27 8392.56 4S28.47 N 70.10 W 2,1.37.39 N 4,1.,1. S.51 W
,1.0414 48 6 8S3S.39 84S4.68 4S9S.SS N 49.70 W 2140.S3 N 4178.7S W
10513 SO S4 8598.38 85].9.47 4468.89 N 68.30 W 2,1.86.94 N 4247.60 W
I0758 S3 48 8748.02 84~9.31 4862.15 N 72.20 W 2252.49 N 4430.11 W
10890 S4 42 8825.14 8746.43 4969.22 N 74.30 W 2283.36 N 4532.69 W
10934 S6 4 8850.13 877]..42 S005.43 N 73.30 W 2293.47 N 4547.47 W
11013 60 36 8891.57 8812.86 S072.60 N 71.90 W 2313.S7 N 4431.42 W
CLOSURE
DISTANCE DG MN S
804.95 N 65 45 23 W
975.21 N 45 20 4]. W
].200.46 N 44 58 47 W
2.328.58 N 44 SI 23 W
].504.64 N 64 43 ,1. S W
1S97.S7 N 64 38 7 W
].728.34 N 64 3]. 9 W
].8S9.94 N 44 24 ].7 W
,1.9~]..04 N 64 ].4 57 W
2,1.21.92 N 64 10 32 W
23,1.4.42 N 64 2 20 W
2578.04 N 43 SI 9 W
2743.60 N 63 44 58 W
2943. ].6 N 43 43 43 W
3,1.68.72 N 43 38 2,1.W
3352.54 N 63 3,1. 18 W
3444.40 N 63 25 44 W
3574.54 N 43 ].9 35 W
3750.37 N 43 8 23 W
3927.80 N 42 S3 44 W
4,1,73.99 N 62 25 27 W
43S4.24 N 42 13 4 W
4S2S.02 N 62 21 4S W
4437.44 N 42 33 18 W
4704.23 N ~2 39 3S W
4777.S4 N &2 4S 27 W
4949.87 N 43 2 56 W
S07S.33 N 43 IS 47 W
5I!0.94 N 63 20 15 W
S177.31 N 63 27 26 W
DOG LEG
deg/100
2. 843
,1..403
2. :1.93
2. 939
O. 7S7
O. 189
O. 093
O. 093
O. 3S5
O. 286
0.415
1.08S
0.512
.
O. 837
O. 290
O. 639
O.SSS
1.737
1.992
1.S,1.8
3.~64
3.0].5
,1.. 573
1. 260
3. S46
S. 853
Y-2S
].].129/88
RECORD OF SURVEY
MEAS DRIFT TRUVERT SUBSEA SECTION DIRECTION REL. AT~VE COORDINATES CLOSURE
DEPTH DG NN DEPTH DEPTH DIST ANGLE FRON WELL-HEAD DISTANCE DG NN S
].].042 62 6 8905.47 8826.76 S098.03 N 73.60 W 2321.12 N 4655.93 W S202.43 N 63 30 9 W
1].074 62 48 8920.27 8841.56 5].26.40 N 74.70 W 2328.87 N 4683.22 W S230.31 N 63 33 35 W
11105 64 30 8934.03 8855.32 S154.17 N 74.70 W 2336.20 N 47].0.0]. W 5257.57 N 63 37 6 W
1].].37 66 48 8947.23 8868.52 S183.32 N 74.70 W 2343.89 N 4738.13 W S286.].8 N 63 40 44 W
11167 69 ].8 8958.44 8879.73 S211.15 N 75.00 W 2351.16 N 4764.99 W S313.48 N 63 44 ].4 W
I].20]. 72 6 8969.68 8890.97 5243.23 N 74.70 W 2359.54 N 4795.96
].1233 74 30 8978.87 8900.].6 S273.87 N 77.S0 W 2366.9]. N 4825.70
1].265 75 24 8987.].8 8908.47 $304.74 N 77.80 W 2373.52 N 4855.89
].].297 76 30 8994.95 89].6.24 S335.75 N 77.80 W 2380.08 N 4886.23
11328 77 ].8 900]..97 8923.26 S365.91 N 77.50 W 2386.53 N 4915.73
S344.96 N 63 48 ].2 W
S374.91 N 63 S2 23 W
S404.93 N 63 57 4 W
S43S.07 N 64 I 46 W
S464.42 N 64 6 ].4 W
11360 78 12 9008.76 8930.05 S397.15 N 77.80 W 2393.22 N 4946.27
].].392 79 ].8 9015.01 8936.30 S428.49 N 78.20 W 2399.75 N 4976.97
].].423 80 ].2 9020.52 8941.81 S458.94 N 78.20 W 2405.99 N S006.83
].1456 8]. 30 9025.77 8947.06 549]..47 N 78.50 W 2412.56 N S038.74
1].487 83 24 9029.84 8951.].3 5522.14 N 78.20 W 24].8.77 N 5068.84
S494.83 N 64 10 49 W
SS25.31 N 64 15 29 W
SS54.92 N 64 20 2 W
SS86.54 N 64 24 S3 W
S6].6.37 N 64 29 2S W
Iq. SSI 87 36 9034.86 8956.].S SS85.74 N 80.60 W 2430.S0 N S13]..53 W
11582 89 42 9035.S? 8956.88 S6].6.57 N 8]..00 W 2435.46 N S].62.].2 W
1].652 92 30 9034.25 8955.54 S686.07 N 82.40 W 2445.56 N S231.37 W
1].747 92 18 9030.27 895]..56 S780.23 N 82.10 W 2458.36 N S325.42 W
11843 92 ].2 9026.S0 8947.79 S875.42 N 82.10 W 2471.54 N S420.43 W
S678.03 N 64 39 2]. W
5707.80 N 64 44 32 W
S774.77 N 64 S6 42 W
5865.46 N 65 13 ].4 W
5957.32 N 65 29 19 W
11936 91 48 9023.26 8944.55 S967.69 N 81.70 W 2484.64 N SS12.45 W
12062 90 42 9020.51 8941.80 6092.85 N 81.30 W 2503.26 N S637.03 W
12157 89 54 9020.01 8941.30 6].87.33 N 80.60 W 2518.20 N S730.85 W
12251 89 36 9020.42 8941.71 6280.9]. N 80.30 W 2533.80 N 5823.55 W
12345 91 6 90].9.85 8941.14 6374.64 N ?8.20 W 2551.33 N 59].5.89 W
6046.53 N 65 44 ].S W
6].67.86 N 66 3 19 W
6259.71 N 66 ].6 44 W
6350.89 N 66 29 il W
6442.59 N 66 40 ].6 W
12440 90 42 9018.36 8939.65 6469.52 N 77.10 W 2571.64 N 6008.67 W
].2566 90 30 90].7.04 8938.33 6595.42 N 77.S0 W 2599.34 N 613]..59 W
12662 BO 36 9016.11 8937.40 669]..32 N 77.S0 W 2620.12 N 622S.31 W
].2756 90 30 9015.21 8~36.50 6785.23 N 77.50 W 2640.46 N 63].7.07 W
].2~14 ~0 24 90].3.97 8935.26 6943.07 N 77.S0 W 2674.66 N 647]..32 W
6S3S.86 N 66 49 47 W
66S9.80 N 67 1 36 W
67S4.22 N 67 10 29 W
6846.71 N 67 18 56 W
7002.27 N 67 32 39 W
DOG LEG
d~g/].O0
6.908
3. 490
, 4
75. ~8
8. 379
8.274
].]..057
2.946
3.438
2.740
2.952
3.643
2.903
4.039
6.203
4.470
O. 379
O. 104
0.608
O. 929
1.1].9
0.451
2.745
1. 232
O. 355
O..1.04
O. ].06
O. 063
Y-2S
RECORD OF SURVEY
MEAS DRIFT TRUVERT SURSEA SECTION
DEPTH DG MN DEPTH DEPTH DIST
DIRECTION RELATIVE COORDINATES
ANGLE FROM WELL-HEAD
1300~ ~0 38 ~013.14 8~34.43 7037.~ N 77.10 W ~S.SS N ~S~3.~ W
1.3].~ 90 42 9011.3~ R932.~5 7194.91 N 7~.40 W 2731.S3 N ~71~.80 W
13259 90 24 9010.47 R931.7~ 7287.8~ N 77.10 W 275~.84 N ~807.32 W
].3353 90 ].2 ~00~.~8 8~31.27 7381.81 N 7~.40 W 2774.3~ N ~898.82 W
].3385 90 24 ~00~.81 8931.10 74].3.80 N 7~.80 W 2781.80 N ~92~.95 W
13418 90 3~ 9009.S2 8930.8]. 744~.78 N 7~.80 W ~789.34 N ~2.07 W
CLOSURE
DISTANCE DG MN S
7095.~1 N ~7 40 27 W
7250.98 N ~7 52 ].2 W
7342.87 N ~7 58 55 W
743S.79 N ~8 S 32 W
74~7.44 N ~8 7 43 W
7S00.0~ N ~8 9 ~0 W
DOG LEG
deg/100
0.471
0.450
0
]..397
0
Y-2S
DATA INTERPOLATED FOR EVEN ].00 FEET OF SUBSEA DEPTH
1.1./29/8B
MEAS.
DEPTH
379
479
TRU VERT SUB SEA ND-TVD VERTICAL.
DEPTH DEPTH DIFF. CORRECT
79 0 0 0
].79 100 0 0
279 200 0 0
379 300 0 0
$79 400 0 0
579 S79 SOO 0 0
879 879 ~00 0 0
779 779 700 0 0
879 879 800 0 0
979 979 900 0 0
1079
1179
1279
].379
1479
:].57~
1879
.'].779
1879
1979
2079
2].79
2279
2379
247.9
257.9
2879
2779
287.9
2979
1079 1000 0 0
].].79 1100 0 0
].279 ].200 0 0
].379 ].300 0 0
].479 ].400 0 0
].579 1500 0 0
1879 ].800 0 0
].779 ].700 0 0
].879 1800 0 0
].979 ]..900 0 0
2079 2000 0 0
2179 2100 0 0
2279 2200 0 0
2379 2300 0 0
2479 2400 0 0
2579 2500 0 0
2879 2600 0 0
2779 2700 0 0
2879 2800 0 0
2979 2900 0 0
RELATIVE COORDINATES
FROM WELL-HEAD
0.00 0.00
0.43 S 0.].4 E
]..OS S 0.34 E
]..87 S 0.54 E
2.37 S 0.85 E
3.2]. S 0.58
4. OS S 0.47
4.90 S 0.38
S.74 S 0.29
8.58 S 0.20
6.91 S 0.08 W
7.24 S 0.35 W
7.58 S 0.83 W
7.91 S 0.91 W
7.77 S 1.23 W
7.83 S ]..SS W
7.49 S ]..87 W
7.34 S 2.20 W
7.20 S 2.52 W
7.].5 S 2.9]. W
7.15 S 3.33 W
7.15 S 3.78 W
7.15 S 4.'1.8 W
7.].5 S 4.8]. W
7.15 S S. 04 W
7. ].5 S S.48
7.28 S 5..92
8.22 S 8.88
8.9]. S 8.1].
8.48 S 11.82
¸'9
Y-2S
DATA INTERPOLATED FOR EVEN ].00 FEET OF SUBSEA DEPTH
1]./2~/88
MEAS. TRU VERT SUB SEA MD-TVD VERTICAL.
DEPTH DEPTH DEPTH DIFF. CORRECT
3O79
3].80
328].
3383
348S
3S89
3594
3800
3908
40].7
4128
4240
43S8
4476
480].
473S
4878
S024
S181
S348
SS1S
S883
S84S
8133
6273
6412
~SS1
~827
3079 3000 0 0
3].79 3].00 ]. 1
3279 3200 2 ].
3379 3300 4 2
3479 3400 8 2
3S79 3S00 ].0 4
3879 3600 ].S S
3779 3700 2]. 6
3879 3800 29 8
3979 3900 38 9
4079 4000
4].79 4].00 8]. ].2
4279 4200 77 ].6
4379 4300 97 20
4479 4400 ].22 2S
4S7~ 4S00 ].S8 34
4879 4800 ].97 4].
4779 4700 24S 48
4879 4800 302 S7
4979 4900 369 87
S079 SO00 436 87
S179 S].O0 S04 68
S279 S200 S88 62
S379 S300 8].3 47
S479 S400 6S4 41
SS79 SSO0 894 40
S67~ S600 733 39
S77~ S700 772 3~
S87~ S800 8].0 38
S97~ S900 848 38
REL.AT]VE COORDINATES
FROM WEL.L.-HEAD
5.98 S ].8.67
1.TS S 28.72
4.0S N 42.88
].]..2]. N 80.49
20.].S N 82.07
3]..24 N ].07.32 W
44.82 N ].35.77 W
60.07 N ].87.95 W
78.43 N 204.05 W
94.08 N 243.8~ W
].].3.94 N
].3S.8S N
].80.S9 N
].88.95 N
221.47 N
288.97 W
333.S]. W
38S.73 W
44S.43 W
S].3.].8 W
2~0.40 N
304.78 N
3S3.30 N
407.S9 N
4~7. ].2 N
882.09 W
779.43 W
887.8S W
].008.72 W
S27.25 N
588.70 N
~43.03 N
89].. ~]. N
73~. 8S N
1].27.32 W
].247.8]. W
].38].. S7 W
].4S7.84 W
IS47.02 W
78].. 22 N
82S. SS N
8~9.97 N
].4.2S N
.gS7.88 N
].833.8S W
].7].9.83 W
].80S.34 W
].8~0.S9 W
].~74.S8 W
DATA INTERPOLATED FOR EVEN 100 FEET OF RUBSEA DEPTH
].].129188
MEAS. TRU VERT SUB SEA MD-TVD VERTICAL.
DEPTH DEPTH DEPTH D ] FF. CORRECT
7].00
7235
7370
7SOS
7840
7780
79].9
8083
8209
8354
8500
8643
8783
8~23
9062
9203
9345
948~
9776
10057
I0].95
].0334
10483
10645
1081].
].0988
].].232
6079 8000 888 38
8].79 6].00 92]. 35
8279 8200 956 35
6379 6300 99]. 35
8479 6400 1026 35
6579 8500 ].08]. 35
6679 6600 ].].01 40
8779 6700 ].].40 39
8879 8800 ].],84 44
897~ 6900 ].230 48
7079 7000 ].275 45
7].7~ 7].00 ].32]. 48
7279 7200 ].36# 43
7379 7300 ].404 40
7479 7400 1444 40
7579 7500 ].483 39
7679 7800 ].524 4].
7779 7700 ].566 42
7879 7800 16].0 44
7979 7900 ].654 44
8079 8000 ].897 43
8179 8100 1740 43
8279 8200 ].778 38
8379 8300 1818 38
8479 8400 ].855 39
8579 8500 ].904 49
8679 8600 ],986 62
8779 8700 2032 88
8879 8800 2].09 77
8979 8900 2253 144
RELATIVE COORDJNATES
FROM WEt.L-HEAD
1001.32 N
].044.00 N
1088.37 N
].].28.73 N
].].70.33 N
2058.2]. W
2].39.52 W
22].9.87 W
2300.22 W
2380.52 W
].2].]..77 N
1255.83 N
].299.90 N
1347.85 N
].398.73 N
2480.82 W
2547.48 W
2834.].4 W
2725.98 W
28].9.83 W
].448.98 N
1497.48 N
1547.53 N
].598.85 N
].646.07 N
29].2.85 W
3005.72 W
3094.73 W
3].80.23 W
3284.04 W
].895.64 N
].749.00 N
].803.77 N
1863.02 N
1922.28 N
3347.58 W
3432.].4 W
35].6.89 W
380]..15 W
3685.82 W
].978.06 N
2032.09 N
2070.84 N
2].07.76 N
2140.08 N
377]..81W
3857.97 W
3945.22 W
4032.99 W
4122.85 W
2178.7]. N
2222.].4 N
2284.77 N
2307.33 N
2388.78 N
4228.09 W
4345.57 W
4470.93 W
4811.72 W
4825.18 W
.)
Y-2S
DATA INTERPOLATED FOR EVEN .1.000 FEEET OF MEASURE..D DEPTH
MEAS. TRU VERT SUB SEA
DEPTH DEPTH DEPTH
1000 978 89P
2000 .1.9].2 .1.833
3000 2942 28G3
4000 ~17 3838
SO00 473~ 4~S7
8000 S3GR S283
7000 S90.1.
8000 680S
9000 73~S 73].~
10000 8].72 8093
1].000 88S0 877].
].2000 ~023 8944
13000 90].4 8~3S
RELATIVE COORDINATES
FROM WELi..-HEAD
8.8S S 0.].4 E
7.1S S 3.00 W
8.].~ S ].2.8P W
~]..2S N 237.SS W
34S.03 N 7~2.~]. W
&.g4.28 N
.1.0].2.S4 N
132~. 40 N
1~73. S4 N
20S4.78 N
.1.4&3..1.1W
207P.81W
2&8S.40 W
33].0.3P W
3P0~.07 W
23].0.2~ N
2494.10 N
2893.S7 N
4E;21.07 W
SS7S. 73 W
&SSS. 22 W
700
i400
2i00
2800
3500
4200
4900
T 5600
V
6300
D
7000
7700
B400
9100
9BO0
i0500
ii200
ilgo0
i2600
-700
700
i400
2tO0 2800
VERTICAL SECTION
STANDARD ALASKA PRODUCTION CO.
Y-25
SECTION AT N 75.00 W
TVD SCALE: ! inch = 1400 feet
DEP SCALE: ! inch = 1400 feet
DRAWN : ii/29/88
Marker Identification
a) TO
MD 'I'VD DEPRT
i34i8 90i0 7447
3500 4200
Departure
4900 5600 6300 7000 7700
Harker Identification ND TVD DEPRT
A) KB 0 0 0
B) TO ~34J8 90t0 7447
HORIZONTAL VIEW
STANDARD ALASKA PRODUCTION CO.
Y-25
CLOSURB 7500 ft N 68.2 W
DECLINATION: 3t.50 deg E
SCALE: t lnch= t400 feet
DRAWN :'tt/29/88
9i00
8400
77O0
7OOO
63OO
5600
4900
4200
3~00
2800
2tO0
t400
700
700
7700 7000 6300 5600 4900 4200 3500 2800 2:1.00 t400
700 0 700
[ TELECD1 Teleco O.fie~d Se,~'-~;~ of n~,=~, Inc.
6116 Nielson Way
Anchorage, AK
99502
(907) 562-2646
November 29, 1988
JOB #665
STANDARD ALASKA PRODUCTION CO.
WELL: Y-25
PRUDHOE BAY
RIG: NABORS 1SE
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to
Standard Alaska Production Company.
Teleco is committed to providing the highest quality MWD service
and we would welcome any comments or questions concerning these
surveys or any of our other services.
Sincerely,
RECEIVED
Dave Reimer
Field Service Supervisor
DR/el
Enclosures
Oil .& Gas Cons. Commis~
. ,
A ~9NIt'I' COMPANY
TELECO OILFIELD SERVICES
JOB 665 SURVEY CALCULATIONS
****************************************
Date 11/29/88
Page 1
Company: STANDARD ALASKA
Well: Y-25
Location: PRUDHOE BAY
Rig: NABORS 18-E
TELECO Job # TAK 665
Grid CorreCtion:
Magnetic Declination:
Total Correction:
Proposed Direction:
0.00 degrees
30.80 degrees
30.80 degrees
285.00 degrees
RADIUS' OF CURVATURE CALCULATION
****************************************
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
****************************************************************************************************
SPERRY SUN GYRO SURVEY
2668.00 0.5 188.0 S 08 00 W 2667.98 1.82 7.16S 5.85W 9.24 S 39.250W 0.000
TELECO MWD SURVEYS
3006.00 3.6 288.5 N 71 30 W 3005.83 10.77 8.03S 13.30W 15.54 S 58.885W 1.942
3100.00 5.6 293.4 N 66 36 W 3099.52 18.26 5.33S 20.34W 21.03 S 75.300W 2.166
3194.00 7.7 293.0 N 67 00 W 3192.88 29.04 1.04S 30.34W 30.3~ S 88.021W 2.234
2942.00 2.4 282.2 N 77 48 W 2941.92 7.42 8.91S 10.07W 13.45 S 48.493W 1.687
2848.00 1.0 254.4. S 74 24 W 2847.96 4.78 8.83S 7.31W 11.47 S 39.629W 0.512
TELECO Job # TAK 665
MEAS DIRECTION TRUE VERTICAL
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION
feet deg deg deg/min feet feet
11/29/88 Page 2
COORDINATES CLOSURE DOG LEG
N/S E/W DIST ANGLE SEVERITY
feet feet feet deg deg/100 '
3289.00 10.1 292.0 N 68 00 W 3286.73 43.61 4.57N 43.92W 44.16 N 84.054W 2.532
3383.00 12.0 291.7 N 68 18 W 3378.98 61.49 11.28N 60.64W 61.68 N 79.464W 2.022
3478.00 14.0 293.1 N 66 54 W 3471.54 82.69 19.42N 80.40W 82.71 N 76.419W 2.131
3573.00 16.2 293.8 N 66 12 W 3563.26 107.16 29.27N 103.10W 107.17 N 74.151W 2.324
3667.00 18.1 295.2 N 64 48 W 3653,.08 134.50 40.76N 128.32W 134.64 N 72.377W 2.068
3762.00 19.9 295.4 N 64 36 W 3742.90 164.93 53.98N 156.28W 165.34 N 70.945W 1.896
3856.00 21.7 294.5 N 65 30 W 3830.77 197.80 68.06N 186.55W 198.57 N 69.956W 1.945
3950.00 ' 23.4 293.4 N 66 36 W 3917,58 233.41 82.69N 219.49W 234.55 N 69.356W 1.863
4043.00 25.1 294.5 N 65 30 W 4002.37 271.14 98.19N 254.39W 272.69 N 68.893W 1.891
4174.00 26.4 295.5 N 64 30 W 4120.36 327.19 122.25N 305.97W 329.49 N 68.221W 1.046
·
4301.00 30.1 295.2 N 64 48 W 4232.21 386.31 147.98N 360.28W 389.49 N 67.671W 2.916
4427.00 33.9 295.5 N 64 30 W 4339.04 451.98 176'.56N 420.61W 456.17 N 67.229W 3.019'
4554.00 37,3 295.5 N 64 30 W 4442.29 524.65 208.41N 487.32W 530.01 N 66.845W 2.677
4680.00 41.0 296.2 N 63 48 W 4539.99 602.77 243.09N 558.89W 609.47 N 66.493W 2.957
4958.00 48.9 296.6 N 63~ 24 W 4736.58 795.14 330.35N 734.68W 805.53 N 65.789W 2.844
5179.00 52.0 296.6 N 63 24 W 4877.28 962.03 406.71N 886.98W 975.79 N 65.367W 1.403.
5461.00 54.1 296.6 N 63 24 W 5046.79 1182.74 507.72N 1088.42W 1201.02 N 64.992W 0.745
, .
TELECO Job # T~K 665 11/29/88 Page 3
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100~
5619.00 54.3 296.0 N 64 00 W 5139.21 1308.41 564.49N
5843.00 49.4 296.6 N 63 24 W 5277.54 1481.09 642.52N
5969.00 45.7 296.9 N 63 06 W 5362.57 1572.10 684.36N
6154.00 44.3 ' 296.9 N 63 06 W 5493.38 1700.09 743.61N
6343.00 44.0 297.3 N 62 42 W 5628.99 1828.81 803.58N
6532.00 43.9 297.6 N 62 24 W 5765'.05 1956.90 864.05N
1203.31W 1329.14
1361.18W 1505.20
1444.18W 1598.13
1560.81W 1728.90
1678.00W 1860.49
1794.41W 1991.61
N 64.868W 0.333
N 64.731W 2.198
N 64.645W 2.942
N 64.526W 0.757
N 64. 411W 0.217
N 64.288W 0.122
6721.00 43.8 297.6 N 62 24 W 5901.36 2084.66 924.77N 1910.41W 2122.47 N 64.170W 0.059
7005.00 42.8 297.6 N 62 24 W 6108.04 2274.72 1015.08N 2082.97W 2317.15 N 64.019W 0.352
7394.00 41.7 298.0 N 62 00 W 6395.98 2529.77 1137.06N '2314.33W 2578.58 N 63.835W 0.291
2461.48W 2744.14
2657.21W 2963.69
2839.34W 3169.25
3001.02W 3353.10
3193.98W 3574.63
3345.59W 3750.45
3496.28W 3927.88
3699.65W 4174.07
7641.00 42.5 296.6 N 63 24 W 6579.25 2691.56 1213.01N
7956.00 45.9 297.3 N 62 42 W 6805.04 2906.37 1312.52N
8239.00 47.3 298.0 N 62 00 W 6999.48 3107.00 1407.94N
·
8492.00 46.0 299.0 N 61 00 W 7173.15 3285.88 1495.73N
8806.00 43.9 300.1 N 59 54 W 7395.37 3500.59 1605.13N
9059.00 44.4 301.2 N 58 48 W 7576.90 3670.28 1694.96N
9311.00 45.6. 303.3 N 56 42 W 7755.08 3840.44 1790.04N
9657 . 00 46 . 2 306 · 8 N 53 12 W 7995.87 4073 . 82 1932 . 71N
N 63.766W 0.499
N 63.713W 1.090
N 63.625W 0.526
N 63.508W 0.589
N 63.318W 0.713
N 63.132W 0.362
N 62. 888W 0. 758~
N 62.417W 0.747
TELECO Job # T~K 665
MEAS DIRE CT I ON TRUE VERTICAL
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION
feet deg deg deg/min feet feet
11/29/88
COORDINATES
N/S E/W
feet feet
Page 4
CLOSURE DOG LEG
DIST ANGLE SEVERITY
feet deg deg/100 '
9910.00
10158.00
45.2 298.3 N 61 42 W
42.2 289.6 N 70 24 W
8172.57
8: 5]..84
10323.00 44.7 289.9 N 70 06 W 8471.62
10416.00 48.1 290.3 N 69 42 W 8535.74
10513.00 50.9 291.7 N 68 18 W 8598.73
10758.00 53.8 287.8 N 72 12 W 8748.37
10890.00 54.7 285.7 N 74 18 W 8825.49
10934.00 56.1 286.7 N 73 18 W 8850.48
11013.00 60.6 288.1 N 71 54 W 8891.92
11042.00 62.1 286.4 N 73 36 W 8.905.83
11074.00 62.8 285.3 N 74 42 W 8920.63
11105.00 64.5 286.7 N 73 18 W 8934.39
11137.00 66.8 285.3 N 74 42 W 8947.58
11167.00 69.3 285.0 N 75 00 W 8958.79
11201.00 72.1 285.3 N 74 42 W 8970.03
11233.00 74.5 282.9 N 77 06 W 8979.22
11265.00 75.4 282.5 N 77 30 W 8987.53
4246.30 2030.04N 3852.14W 4354.32 N 62.211W 2.436
4415.37 2099.52N 4008.56W 4525.10 N 62.356W 2.707
4528.44 2137.87N 4115.35W 4637.52 N 62.549W 1.520
4595.51 2161.01N 4178.58W 4704.31 N 62.654W 3.669
4668.86 2187.44N 4247.44W 4777.62 N 62.751W 3.088
4862.12 2252.97N 4429.95W 4969.94 N 63.043W
4969.19 2283.84N 4532.53W 5075.41 N 63.258W
5005.40 2293.94N 4567.31W 5111.02 N 63.332W
5072.57 2314.05N ,4631.46W 5177.38 N 63.452W
1.729
1.460
3.691
5.892
5098.00 2321.59N 4655.76W 5202.50 N 63.497W 7.295
5126.36 2329.34N 4683.06W 5230.38 N 63.554W 3.752
5154.14 2337.00N 4709.76W 5257.70 N 63.609W 6.815
5183.28 2345.04N 4737.78W 5286.37 N 63.666W 8.219
5211.11 2352.31N 4764.63W 5313.67 N 63.724W 8.384
5243.19 2360.69N 4795.61W 5345.16 N 63.791W 8.278
5273.84 2368.16N 4825.33W 5375.13 N 63.859W 10.384.
·
5304.71 2374.95N 4855.47W 5405.19 N 63.935W 3.061
TELECO ~Fob #
MEAS
DEPTH INCL
DIRECTION
AZIMUTH BEARING
TRUE VERTICAL
VERT DEPTH SECTION
11/29/88
COORDINATES
N/S E/W
Page 5
CLOSURE DOG LEG
DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
********** ******* **************************** ********************* ****** *****************************
11297.00 76.5 282.2 N 77 48 W 8995.30 5335.72 2381.59N
11328.00 77.3 282.5 N 77 30 W' 9002.33 5365.88 2388.05N
4885.80W 5435.35
4915.29W 5464.70
N 64. 013W 3.555
N 64.088W 2.749
11392.00 79.3 281.8 N 78 12 W 9015.30 5428.47 2401.24N 4976.56W 5525.58 N 64.242W 3.303
11423.00 80.2 281.8 N 78 12 W 9020.82 5458.93 2407.49N 5006.41W 5555.20 N 64.318W 2.910
11456.00 81.5 281.5 N 78 30 W 9026.07 5491.45 2414.07N 5038.32W 5586.81 N 64.399W 4.041
11487.00 83.4 281.8 N 78 12 W 9030.14 5522.13 2420.28N 5068.42W 5616.64 N 64.475W 6.204
11551.00 87.6 279.4 N 80 36 W 9035.16 5585.73 2432.01N
11582.00 89.7 279.0 N 81 00 W 9035.89 5616.56 2436.96N
5131.11W 5678.29
5161.71W 5708.07
5230.95W 5775.03
5262.64W 5805.54
5294.30W 5836.12
5324.96W 5865.78
11652.00 92.5 277.6 N 82 24 W 9034.55 5686.06 2447.07N
11684.00 92.5 277.6 N 82 24' W 9033.15 5717.76 2451.31N
11716.00 92.4 278.3 N 81 42 W 9031.78 5749.49 2455.73N
11747.00 92.3 277.9 N 82 06 W 9030.51 5780.24 2460.10N
N 64.640W 7.552
N 64.727W 6.896
N 64.930W 4.472
N 65. 024W 0. 175
N 65.116W 2.208
N 65.203W 1.332
12157.00 89.9 279.4 N 80 36 W 9020.31 6187.36 2519.99N 5730.39W 6260.02 N 66.262W 1.119
12062.00 90.7 278.7 N 81 18 W 9020.80 6092.87 2505.05N 5636.58W 6168.17 N 66.038W 0.929.
11936.00 91.8 278.3 N 81 42 W 9023.55 5967.71 2486.43N 5511.99W 6046.85 N 65.720W 0.608
11843.00 92.2 277.9 N 82 06 W 9026.80 5875.44 2473.33N 5419.98W 5957.65 N 65.471W 0-.087
11779.00 92.2 277.9 N 82 06 W 9029.26 5811.98 2464.51N 5356.64W 5896.39 N 65.294W 0.371
TELECO Job # TAK 665 11/29/88 Page 6
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
******** ********************************************************************************************
12251.00 89.6 279.7 N 80 18 W 9020.72 6280.93 2535.59N 5823.09W 6351.19 N 66.470W 0.451
91.1 281.8 N 78 12 W 9020.14 6374.66 2553.12N
12345.00
12440.00 90.7 282.9 N 77 06 W 9018.65 6469.55 2573.44N
5915.43W 6442.88
6008.22W 6536.15
N 66.655W 2.745
N 66.814W 1.232
12566.00 90.5 282.5 N 77 30 W 9017,33 6595.44 2601.14N 6131.13W 6660.08 N 67.011W 0.355
6224.84W 6754.50
6316.60W 6847.00
12662.00 90.6 282.5 N 77 30 W 9016.41 6691.35 2621.95N
12756.00 90.5 282.5 N 77 30 W 9015'.51 6785.26 2642.34N
N 67.159W 0.124
N 67. 300W 0. 126
13385.00 90.4 283.2 N 76 48 W 9010.10 7413.83 2783.74N 6929.46W 7467.71 N 68.113W 1.399
13353.00 90.2 283.6 N 76 24 W 9010.27 7381.85 2776.33N 6898.33W 7436.06 N 68.077W 0.775
13259.00 90.4 282.9 N 77 06 W 9010.76 7287.89 2754.78N 6806.83W 7343.15 N 67.966W 0.819
13166.00 90.7 283.6 N 76 24 W 9011.65 7194.94 2733.47N '6716.31W 7251.26 N 67.854W 0.451
13009.00 90.6 282.9 N 77 06 W 9013.44 7038.02 2697.49N 6563.51W 7096.20 N 67.658W 0.471
12914.00 90.4 282.5 N 77 30 W 9014.27 6943.10 2676.60N 6470.83W 7002.56 N 67.528W 0.075
TELECO 0 i 1F i e I d Serv ices
PLAN VIEW
WEST (Ft>
9600 8000 8400 4800 3~00 1600 0
18800
20O
8000
4800z
9200
1600
0
1600
TELECO 0 i 1F ieI d S~rv ices
VERT I CAL PROJECT I ON
0
2000
4000
8000
sooO
I0000
2000 4000 8000 8000 10000 12000
12000
14000
18000
18000
20000
VERTICAL SECTION
Standard Alaska
Production Company F~
900 Ea$1 ~enson ~ule
P.O. Bo= 196612
Anchorage, Alaska 99519-6612
(907) 564-5 i I !
INOEXED
TO:
HOUSTON ' '
ARCO
CHEVRON
E}QiON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
STANDARD
ALASKA PRODUCTION
'Date: 01/25/89
T~: 79769
REFERENCE:
SA~C ~INAL DATA - ?~J~SS~ SI~ DATA
The following material Is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of this lea-tar and returning It to this offlce:
G- 11 Static Gradient 01 / 08 / 89 Camco
M- 04 Sta~¢ Grac~ent 01 / 16 / 89 C~c0
N- 15 ~c G~e~ 01 / 16 / 8 9 C~co
N- 19 S~¢ G~e~ 01 / 14 / 8 9 C~co
R- 13 S~c G~~ 01 / 15 / 8 9 C~co
S- 08 S~c G~~ 01 / 15 / 89 C~co
W- 01 Flo~g G~e~ 01 / 10 / 89
W- 20 Flo~ng G~e~ 12 / 28 / 88
W- 27 S~~ G~e~ 01 / 1 3 / 89
W- 34 Flo~ng Gra~e~ 12 / 21 / 88
W- 39 S~~ G~e~ 01 / ~ 9 / 89
Y- 24 S~~ G~e~ 01 / 17 / 89
Y-25 ~c G~e~ 12/30/88 C~c0
Z- 20 S~~ G~e~ 12 / 30 / 88
FEB - 2 ]¢8g - ~ ~
Alaska Oil & C-~s Cor, s. Commissior~
Received
Date
A unit of the or,cj,nat Standard O~i Co,npor~y
Founded ,n Cleveland. Oh,o. in 1870
Jennif~ Di~tz
I NFORNAT1 ON CONTROL
Wel I Records LR2-1
Slanda~d A|a$~o
P~O~du¢l~on Company
900 EO%I ~"n%on ~ulevoid
P.O ~, 19661?
An(ho~o~e. AIo~o ~19-661~
INDEXED
TO:
REFERENCE:
HOUSTON
ARCO
CIIEVRON
EXXON
TEXACO
MARATHON
MOBIL
PHILLIPS
GEOSCIENCES
SAPC TVD LOGS
STANDARD
ALASKA PRODUCTION
Dote: 12-07-88
TI: 79622
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
Y-25 EWR/GR 11-17/24-88 #I thru 9
- Y-25 ='"~ FDC/PORO 11-17/24=88 #1 thru 9
8875-8945 hZ.,' 2"/5"
8875-8945 NL 2"/5"
OPEN HOLE
Y-25
Y-25
EWR/GR 11-17/24-88 #1 thru 9 10987-13368 NL 2"/5"
FDC/PORO" 11-17/24-88 #1 thru 9 10987-13368 NL 2"/5"
Received
Dote
A un;t of fhe o~',g;~ol Stondo,d 0~1 Co.npony
Founded ,, Cle,,elond. Oh;o. ,n 18"0
Shirley R. McCurry
I NFORMAT I ON CONTRO(_
Wel I Records LR2-1
Standard Alaska ~
P~ocluction Compan~ ~
P.O. ~ 196612
Anchorage. Alaska ~519-~ 12
(~7) 564-511 I
HOUSTON
ARCO
CHEVRON
E,~CfON
TEXACO
To: bIOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE: ARCHIVES
SAPC CASED HOLE FINAL LOGS
I NOEXED
·
:STANDARD
ALASKA PRODUCTION
Date: 01-13-89
TI: 79732
The following material Is being submit-ted herewith. .Please acknowledge receipt by
signing a copy of this letter and returning it to thls office:
A-16 INJ Profile #1 12-23-88 10550-11050 Camco
W-34 Prod-F #I 12-31-88 10500-10700 Camco 5"
W-39 PITS #1 12-31-88 9400-9800 Camco 5"
Y-25 GR/CCL #1 12-30-88 10000-11236 Camco 5"
Z-20 PROD-F #1 12-27-88 11200-11539 Camco 5"
Rece I ved
Oa~e
,
A unit oJ the o~,9~noJ Standard ~i Core.ny
Fouled in Clevelo~. ~'o. ,n 1870.
Shirley R. McCurry
I NFORPLAT I ON CONTROL
Wel I Records LR2-1
Standard Alaska
.
Produ¢lJon Cort~pan~
900 Eo$I Ben~on Boulevord
P.O. Bo~ 196612
Anchoroge. Alosko 99.519.6612
~907f 564-51 I
ARCO
EXXON
PHILLIPS
STATE.: OF AK
STANDARD
AI_ASF¢~ PRODUCTiON
Date: 12/15/88
79631
SYSTEMS (Transmittal & Tape)
ARCHII~S
SAPC MAGNETI~ LIS TAPES & LISTINGS
The following mterial is being submitted t'mrewith. P!e~se acknowledge receipt by.
signing a cop}, of this letter and returning, it to this office:
Y-25
OH MWD 1.2/06/88 #; ¢2
NL Ba~o~#88-11-27 SOA
10833-13417 Tap6 Pos. #06219
1'600bpi API#5002921883
* EYJ<ON: Ar, Asterisk (*) next to a listing above means you should
have received the Tape(s) and Listing(s) directly from the respective
service company. Pi. ease confirm this.
Date ~ '~C ~ 9 ]988 ~ W~~rds ~2-1
a.
co.~M~ka G~s Con=. Commission
OR' DUM _ State ot Alaska
~t~LASKA OIL AND GAS CONSERVATION COMMISSION
TO: Lonnie C Smith DATE:
Commissioner
FILE NO:
November 10, 1988
D.BDF.141
TELEPHONE NO:
THRU: Michael T Minder ¢,~,,,.;F,~ · SUBJECT.'
Sr Petroleum Engineer
B obb y D F ost er~~'~
Petroleum Inspector
FROM:
BOP Test
SAPC PBU Y- 25
Permit-~ 88-131
Prudhoe. 0tl Pool
Wgdnesday, November2, 1988: The test began at 4:30 p.m. and was
completed 'at 6.'30 p.m. AS the attached BOP test report shows, there
were no failures.
In summary, I witnessed the BOP test on SAPC's Y-25.
Attachment
~IA (Rev. 8/85)
Location. General___i/__~Well Sign
General Housekeeping~// Rig
Reserve Pit
Mud Systems Visual Audio
O&G #4 /~
ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report
ACC~LATOR SYST~
Full Charge Pressure ~~.. psig,~
Pressure After Closure ~. ,. psig,
Pump incr. clos. pres. 200 psiE ~ min~ sec.
/ Full Charge Pressure Attained: / mind'sec.
,, / /
/' Controls: Master ,..~~
_
Remote ~~, Blinds switch cover ~
/
. Kelly and Floor Safety ~lyes_ . '
Test Pressure Upper Kelly / Test Pressure 3~O/~~'"
~-- / .
Trip Tank
Pit Gauge
Flow Monitor
Gas Detectors
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve - ,c:~/~"~a
Kill Line Valves
-/
Check Valve '~///~
Test Results: Failures ~
Repair or Replacement of failed equipment to be made within
Commission office notified.
_
Remarks:
Choke Manifold c-/~ Test Pressure ~0 O/~,~a:..~.
No Valves /
No. flanges ~ ~
Adjustable Chokes_ ~.
Hydrauically operated choke I
Te~t Time · ~ hrs.
day~ and Inspector/
Distribution
orig. - AO&GCC
cc - Operator
ce - Supervisor
I0 20 . ~0.. ~ 40 I "t0 ~- 20.
3O 40.. l I0~
/
(Actua I) I
03
O1
Y-20 (Prope~md)
280'--~ e-- Y- 24
(Proposed)
(Act t~l) _ _ 2492'
.
Y-al
pORTION OF
T !1 N, R 13 E, UM
SCALE i"= I/2. MILE
CERTIFICATE OF SURVEYOR
p.AD j DETAIL
SCALE i": 300'
I
1~$-~?-11-13 ) e
(14-,~?-11-13 ) ·
(43-ff~-I!-13 )
.
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska and that this plat
represents a location survey of the welipad shown and tl'a wells
thereon. This survey was made by me or under my supervision-
and all dimensions and other details are correct. Bottom hoJe
locations are furnished by others.
Date' -"- Surveyor
~ Prolx)sed BHL Y-22
~ Proposed BHL Y-ICJ 6 Y-21
I~hle BHL Y-7,8,9,10,12,~ I~ from ~
~ Pro.eld ~L Y-13
Add Propo~d BHL Y-!0
~vlsI BHLY- 3,4,a II frOm Pro~ed to Actual
~d ~opo~ed BHL Y-9
Add Pro~d BHL
Rewied Pro.see BHL Y-7
Md ~o~Md BHLY-7
A~ Pro~ ~L Y-12
~ Pr~ ~L Y-II
All W ~iel ~ ~' ~b
z /~4/aG ~
2
4/ S/m P~R
3 / 23/el D4~O
$/2/81 PJR
2/2/8! PJR
l/2~t PJR
;o/9/eO ~
9/Z~ P~
Revised BHL Y- 1,2,5 86 from Pmlx~ed to Actual.
MOTE: Plot doted Aug. ~0,1979 chem~ed tO OCt. 2, 1979. BHL
_~l,5 $ 6 chemical. C.J.R.
AS- STAKED
PAD "Y"
Located in
NE V4 & NW h/4 PROTRACTED SEC~ $~ a
Surveyed for
,SOHIO PETROLEUM CO.
Surveyed by
F, M, LINDSEY & ASSOC.
LAND 8~ HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
04
OI
ElgO'
03
$2 o'
03
Y-20 (Proposed)
LONG.-- 14844~ 21.96
(Proposed) '3- -~) _
Y-ii R~rIII (Actual)
(Actual)_
_
~ '~Y.5
j °l(Actual) T. iIN.i
pORTION OF
lq
.-_ Til N, RI3E, UM 3
SCALE I"= !/2 MILE
~-24 CERTIFICATE OF SURVEYOR
(Proposed)
I hereby certify, that I am properly registered to
2500' ~]-
~3.oo ..... J
O2
PAD_ DETAIL
SCALE 1":300'
IF-~
(~$-,~?-11-13) ·
(14-,??-11-13) ·
( 43-~e~I-t 1-13 ) .O____l~' Y-4
(~1-34-11-13) · ¥-5
Proposed BHL Y-22~
practice land surveying in the Stgte of Alaska and that this plat
represents a location survey of t~he wellpad shown and tl-~ wells
thereon. This survey was made by me or under my supervision--
end all dimensions and other details are correct. Bottom hole
locations are furnished by others.
- ~,,~* ." 49:
$ ~u "'~,il ,, · -, ..
C
NOTE= Ali botto~ ~oles ere 8800~ sub see.
I i II . I II
~ Proposed BHL Y-19 & Y-21 2/20/86~,~-
10/20/81 ~TL'
""'",.d P,opa.d'" 1
Add Proposed BHL Y-I0
Revise BHLY- $,4,& !1 from Propoeed to Act~l 4/ :5/81 PJR
Add PrOl~Oeed BHL Y - g 3 / 2~/81 DHO
Add Proposed BHL Y-8 5/2/81 PJR
Rev,ted Proposed BHL Y-7 2/2 /8I PJR
Add Proposed BHLY-? I/28/81 PJR
Add Proposed BHL Y-12 10/9/80 PJR
Add Proposed BHL Y- II 9/26/80 PJR
Ail ~ettom Hoist ore 8800' tub sea.
Rtvtted BHL Y- I, ~-,5 8 6 from PropoIed to Actual. 6/25/80LAB
NOTE: Plat doted Aug. :50,1979 changed to Oct. 2, 1979. BHL
1,5 ~ 6 changed.
C.J.R.
II _ IIIII Ii. Bill II
A~- ~TAKED
PAD "Y"
NE 1/48 NWl/4 Located in
PROTRACTED SEC. 3_3 & 34, T. IIN.~_.R 13E.,U.M.,AK
Surveyed for
,~SOHIO PETROLEUM CO.
II I I II I I I I Ill
Surveyed by
F.M. LINDSEY & ASSOC.
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
I I ]] I[ [] [ I ! II I
October 31, 1988
Telecopy,
(907)276-75/~2
Ted
P~dhoe-lay Unit Drilling Engineering Supervisor
-Standard Alaska Production Company
P.O. Box 196612
Anchorage, Alaska 99§19-66t2
~c~dard Alaska Production
P~c ~o. 88-131
Sur. Loc. 1402'S~. 168'~L, Sec. 33, TllN, R13E,
B~ole Loc. 3730'S~, 1940'~, Sec. 29, T11N, R13E,
Dear ~. S~agg,
Enclosed is the approved application for permit to drill the
above referenced well.
The pe~t to drill does not indemnify you from the probable need
to obtain additional permits required by law from other
$overnmental agencies pti-or to commencing operations at the well
site.
To aid us in scheduling field work. please notify this office 24
hours prior to coa~en~g installation of the blowout prevention
equipment so ~hat a representa~-ive of the Commission may be
present to witness testing of the equipmen~ before the surface
casing shoe is drilled. Where a diver~er system is required,
please also notify this office 24 hours prior co commencing
equipment installation so chat the Commission may witness testing
before drilling below the shoe of the conductor pipe.
~trman of
Alaska Oil and Gas Conservation Commission
BY ORD~ 'OF THE COMMISSION
dlf
EnclOsure
Deparcmen~ of Fish & Game, Habi.~.~ection w/o encl.
Depar~men~ of Environmental Conservation w/o encl.
Standard Alaska ~
Production Company ~
900 Fast Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-.5111
STANDARD
ALASKA PRODUCTION
October 31, 1988
· Mr. C. V. Chatterton
Alaska Oil and Gas Conservation Commission
3301 Porcupine Drive
Anchorage, Alaska 99501
Dear C. V. Chatterton:
The permit details for Well Y-25 are enclosed, with exception of the wellhead location survey
and three copies of the 1": 100' pad maps. These will follow as soon as possible.
Verbal approval for spudding Well Y-25 was given by Lonnie Smith in a telephone
conversation on Friday, October 28, 1988.
If you have any questions, please call me at 564-5173.
Tea o. g gg //
Prudhoe B~y Drilling Engineering Supervisor
TOS/RIS/ta
Attachments
OCT
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
i STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
[la,'Type of work Drill 171 Redrilll-'lllb. Type of well. ExploratoryD Stratig.raphic Testl-i Development Oil []
Re-Entry I-I Deepen 1'-]I Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Standa~r'd.-~4'-l~-s~'a-P-r~'~j~'-~,~'~'nv KBE .~ ao feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P, O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 2RPI~I?
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 2o AAC 25.o2s)
1402' SNI.., 168' WEL, SEC. 33, T11N, R13E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
4250' SNL, 0 WEL, SEC. 29, T11N, RI3E Y-25 (44-29-I 1-13) KOO683449-G-14
At total depth 9. Approximate spud date Amount
3730' SNL, 1940' WEL, SEC. 29, T11N, R13E October31, 1988 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property 15. Proposed depth(M0an~TVO)
preperty line
ADL 28297 feet Y-22A 35 feet 2491 13743'MD 9035' TVDfeet
16. To be completed for deviated Wells 2800£t/45.6oleg. 17. Anticipated pressure (see 20 AAC 25.035 {®){2))
Kickoff depth 1{)0~7 feet Maximum hole an~lle .87.5~ Maximum surface 3330 pslg At total depth (TVD) 8800 4390 pslg
18. CaSing program Specifications ' Setting Depth
s~ze Top Bottom Quantity of cement
:Hole Casing Weight Grade Coupling Length M D TVD M D TVD (include stage data)
80' Surface 110' 110' 8 cu yd$ Concrete
20" Cond. ~ .
17-1/2" 13-3/8" i 68# L-80 BUtt 2650' Surface 2680' 2680' 3723 cuft Permafrost
12-1/4" 9-5/8" 47# NTSOS NSCC 11060' Surface 11090' 8859' 2421 cuft Class G
8-1/2" 5-1/2" 17# L-80 Butt i 2753' 10990. 8787' 13743' 9035' Uncemented Slotted Liner
19. To be completed fOr Redrill, Re-entry, and DeePen Operations.
Present welt condition summary
Total depth: measured .......... feet .... Plugs-(measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
ConductorRECEIVED
Surface
Intermediate
Production OCT ~ ]. ]9~
Liner ~,.: .... ~,
Perforation depth: measured -~,~,~,,(~OJJ & ~aS Cons,
true vertical '
20. Attachments 'Filing fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling program []
Drilling flUid program [] Time vs depth pict [] Refraction analysis [] Seabed reportl-I 20 AAC 25.050 requirements E]
21, I hereby~~ing istrue and correct to the best of my knowledgo
Signed Title PBU Drilling Engineering. Supervisor Date
~ /" /'~ Commission Use Only // '/ '
Permit Number 1APl number IApprova. l~d,at..e. ISee cover letter
~'~'-/,v'~/ 150'O2'-~'- ~"'/' ~;~'(~;:'"-~I 1U/31/88 Ifor other requirements
Conditions of approval samples required [] Yes J~[NO Mud Icg required I-! Yes J~ No
Hydrogen sulfide measures [] Yes 'I~No Directional survey required ~ Yes I-1 No
~equired work~~~ 0M; !-115M'?
Other: by order of
Approved by {~ ~' .--~"', ( 'N~~ Commissioner ,ne comm,ssion D
Form 10-401 Rev.'~"~. -2-1
SE
)licate
GREAT LAND DIRECTIONAL DRILLING, INC.
1111 E. 8Oth
Anchorage, Alaska 99502
349-4511
11-03-88
Richard Smith
Standard Alaska Production Company
Richard:
We have examined ~he .potential intersections of well Y-25 with
the other ¥~-~wells, The profiles for Y-25 and Y-14 were
provided by you and the other wells were calculated from gyro
data provided by Standard.
All of the close approach situations occur prior to or at the.KOP
.~f Y-25 at 2800 ft BKB. The closest 'is ¥-~2 which is 37' feet
away at the surface, has a near point of only 10 feet at 836 TVD,
and remains within 60 feet to 1089 TVD BKB.
The near points are summarized here:
Well Distance At TVD BKB
Y-2Z 10 ft 836
Y-10 31 ft 1100
Y-09 67 ft 2600
¥-21 70 ft 1200
There are two crossings of Y-25 with other Y-pad wells, both
exceeding 200 feet in separati~. The crossings are summarized
below:
Well TVD BKB Y-25 TVD BKB Y-25 is
Y-2~ 1035 3300 2~65 ft below
Y-19 4439 4662 223 ft below
TVD's have been adjusted to the Kelly bushing of Y-25.
Analysis by: ~~~ Checked by: ~). ~~'~"~'~--~'~
M.M. Monroe D. ThompsOn
AFE No.
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL Y-25 [44-29-11-13] 'PBU
HIGH ANGLE WELL [Y-22A BOTTOM HOLE LOCATION]
Install.:and cement 80' of 20" conductor to surface.
The drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the
17-12" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 8.9
ppg oil base mud in the 8-1/2" hole.
Drill 17-1/2" hole to 2680' and cement 13-3/8" casing to surface.
Install blowout prevention equipment consisting-of 5000 psi W.P. pipe
rams, blind rams and annular preventer. Maximum possible bottomhole
lxessure is 4390 psi at 8800' TVDss based on original reservior pressure.
Maximum possible surface pressure is 3330 psi based on a gas column to
surface from 8600' TVD ss and an oil column to 8800' TVD ss.
Directionally drill 12-I/4" hole to the 9-5/8" casing point just above the
Sadlerochit Sandstone. Run 9-5/8" 47# ~-S NSCC casing to within 5'
of 12-1/4" TD and cement in two stages: First stage using Class G cement
around the 9-5/8" shoe. The second stage m Joe downsqueezed in -~e 13-
3/8" x 9-5/8" annulus followed by non .freezing fluid.
Directionally drill 8-1/2" hole to TD. Run 5-1/2" slotted liner with
retrievable SBR and liner hanger/packer from TD to 100' inside the 9,5/8"
shoe.
Change over to 9,6 ppg NaC1 completion fluid. Test packer and casing to
3000 psi.
Run 5-1/2" tubing, with packer and sliding sleeve. Packer to be set at a 50
degree hole angle. A subsurface safety valve with dual control lines will be
placed I00' below the base of permafrost. Install and test Xmas t.ree.
Freeze protect the tubing and annulus. Set and test the packer.
Tubing size:
TailPipe Size:
5 1/2" 17# L-80 A/B Mod Butt Tubing with 4 GLM's
5-I/2"5-1/2" 17# L-80 A/B Mod Butt Tbg Slotted L~.~C
EiVED
RIS:28-OCT-88
0C]'3 1 1 88
20" Conductor
Ball Valve
PROPOSED DOWNHOLE DIAGRAM.
~:LL Y-25 [44-29-11 131PBU
PROPOSED DEPTH
BKB
110
211'0
13-3/8" Casing Shoe
17- I/2" Open Hole
2680
2700
5-1/2" t7# L-80 A/B Mod Butt Tubing
Packer 10243
Liner Hanger/Packer
1099O
9-5/8" Shoe
· 12-1/4" Open Hole 11090
11095
5-1/2" 17# L-80 A/B Mod Butt Tubing Slotted Liner
5-1/2" Liner Shoe
8-1/2" Open Hole 13743
......... ? 13743
I
I I
I
I
I I
I !
I
I
I I
I
I
I
! I
I I
I I
! I
I I
I
I I
I I
I
B.O.P. STACK CONFIGURATION
13-S/8 IN. TRIPLE RAM STACK
SO00 PSI WP
DRILLING
ANNULAR
PREVENTER
Z IN. KILL LINE
~ '
GATE GATE
PIPE RA~IS
!
I I
! t
BLIND RArlS
! .I
DRILLING
SPOOL
4 IN. CHOKE LINE
i
GATE GATE
I !
PIPE RAMS
1
HuD
T'AN~
WATER
T'/~I P TANK
75'
Choke Manifold
Poor Boy Degasser .
Brandt VacuumvType Degasser
Brandt Dual Tandem Shale Shaker
Pioneer Mud Cleaners
Pioneer MKI Centrifuge
TO
TY.~
·
1 - RecOrding drilling fluid, pit 'level indicator with both visual and audio warning
de~ices at driller's console
1 - Trip Tank (75 BBL.)
1 - Drilling fluid flow sensor with readout at driller's console
11 - 5 Hp Agitators
CHECK LIST FOR NEW WELL PERMITS Company , ~ ~ ~ ~ Lease & Well No.
- ITEM APPROVE 'DATE '~ YES NO
(1) Fee ~/~C f~//~)~ 1. Is the permit fee attached ...................................... - .... ~
(2) Loc
2 thru 8)
(8)
(3) Admin .~/~C ~
(10 mad 13)
(14 thru 22)
(5) Bo E
(23 thru 28)
//
'(29 thru 31)
(6) Add:,
Geology: Engineering:
LCS
2. Is wei1 to be located in a defined pool ............................. ~ .....
3 Is well located proper distance from property line . ~__
5. Is sufficient undedicated acreage available in this .... ~--
6. Is well to be deviated and is wellbore plat included ................ R~_
7. Is operator the only affected party .................... ~ ............ ~-
8. Can permit be approved before fifteen-day-wait ...................... ~
Y-z.5- ....
REMARKS
10.
i1.
12.
13.
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate .....................................
Does the well have a unique name and number .........................
14.
15.
16.
17.
18.
19.
20.
21.
22.
Is conductor string provided ........................................
Will surface casing protect all zones reasonably expected =o
serve as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production.strings ...
Will cement cover all known productive horizons .....................
Will all casing give'adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment.procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
23.
24.
25.
26.
27.
28.
For
29.
30.
31.
32.
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate~
Are necessary diagrams and descriptions of ~-m~BOPE attached. ~
Does BOPE have sufficient pressure rating - Test to ~OOO psig .. ,,~
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable .................................
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
rev: 08/11/88
6.011
Additional requirements .........................................
on R~r :
~IT~ GEO. ~IT ON/OFF
POOL ~S STA~S ~ NO. SHO~ ~m~,'/ d~;/) ~,' '~,~
o
~.,].
~,-~o
Well History File
APPENDIX
Information of detailed nature that is not
particularly'germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
F:. C F' ?. ETA P N:'-'!
RECEIVED
DEC 1 9 1988
~a~ 011 & Gas Cons. Commission
~chorage
i:i~ F.:, C F.: L. L.. - E~ 0 (] 0 0 0 F_i 0 0
C?-4 P'.S F,':. L ;._ - E; 0 0 0 i} 0 0 0
0 {) 0 ~3 {.] '.:-'..
Ci 4 C', 'L'! Ci L
0 4. Fi ',] ?: 'L
744.. 54
~9 ~ 81
i % 3 ~ 50
233 ~ ~S ~1
33:3 ~ S 0
292 ~ 8 ~.
31 ~ S :3
5:3:3,58
7'F $, 72
8:32 = 57
?8,24
39,71
0 33 ~ 50
7:?, 90
! :3:3 ~ 50
¥ :'5.52
iL 9 ~ 91
:i::33 S ~ 50
79i ,54
'~ 7 ~ 24
28 ~. 07
44 ~ 92
,":: S 9,4:3
'77,4 ,, 57
7" 92 ~. n 4
25,8!
:1;5 6"
88 7,45
772,56
21
3266, :33
32.18, .,'i:9
19,48
3 E! 28 . 14
i s ,, 74
3126, O i
2:7 ,, 26
P ! i ! , 65
28,2 i
3264.43
31 78.41
25, S4
25,4R
3! 16,36
l 9,0 5
3270 ~ 17
20 ~ Z 8
:31 i 2,65
33:0 3,2. 7
17 ,, 44
3:2 6:5 ,. 88
! 7 ,. 30
999 ** 25
31 96.66
18 .; 27
16,9'9
27,66
31 27 = 8
320 3, '!-:P.
:3284 ~. '9:3
9'160., 8 8
:?,:30 7.64
28 ,~ 6:3
31 70 , 20
28.20
· ::; -~ k:- b: H %,
30 91., 'al.
:73271; 26
2 S = '?
":' '? 91
S' 213 ili. 6
3231
25 =
i 8: ! 9
C 'X 'T
15,98
2.-i 6
16, :5.: 4
2.2:8
l :i!i, '3 2
2 = 44
2.24
15,19
2; 27
18,5
5.92
-"} "2 "l,
"7
24.44
:':. :!:3 ,, :!::,2
2 '! . 1:5
2:3., ' :'
LIS VERIFICATION LISTING FOR:
STANDARD ALASKA
WELL Y-25
PRUDHOE BAY
** reel header **
service name :DG
date :88/12/05
origin :TR23
reel name :TAK665
continuation # :01
previous reel :
comments :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE
** tape header **
service name :DG
date :88/12/05
origin :TR23
tape name :TAK665
continuation # :01
previous tape :
comments :RIG NABORS 18E
** file header **
file name :TAK665.001
service name :DG
version # : 1.23
date :88/12/05
maximum length :1024
file type :LO
previous file :
** information records **
table type :TOOL
MNEM
STAT
LENG
WEIG
HEIG
GR ALLO 0.000 0.000 0.000
RSN ALLO 72.000 0.000 0.000
DCDS ALLO 360.000 0.000 0.000
** information records **
table type :CONS
MNEM
STAT
PUNI
TUNI
VALU
BS UNAL
CS I Z UNAL
SD UNAL
WMUD UNAL
SHT UNAL
BHT UNAL
TD UNAL
YEAR UNAL
MONT UNAL
DAY UNAL
** information records **
IN
IN
F
LB/G
DEGF
DEGF
F
IN
IN
F
LB/G
DEGF
DEGF
F
8.500
0.000
10200.000
9.100
0.000
0.000
13430.000
88.O00
12.000
5.000
table type :CONS
MNEM STAT PUNI TUNI
SON UNAL
RI UNAL
R2 UNAL
R3 UNAL
R4 UNAL
R5 UNAL
R6 UNAL
R7 UNAL
R8 UNAL
HIDE UNAL
WN UNAL
CN UNAL
FN UNAL
FL UNAL
FL1 UNAL
LUL UNAL
ENGI UNAL
WITN UNAL
DFT UNAL
LONG UNAL
LATI UNAL
STAT UNAL
COUN UNAL
DMF UNAL
LMF UNAL
PDAT UNAL
APIN UNAL
VALU
mmmmmmm
GAMMA/DIRECTIONAL
Y-25
STANDARD ALASKA PROD CO.
PRUDHOE BAY
ANCHORAGE
BROCKWAY/ST. PIERRE
SCALES
ALASKA
NORTH SLOPE
RKB
RKB
OS 1 UNAL
OS2 UNAL
OS 3 UNAL
0 S 4 UNAL
0 S 5 UNAL
0 S 6 UNAL
TLAB UNAL
TCS UNAL
TN1 UNAL
TN2 UNAL
TN3 UNAL
TN4 UNAL
TN5 UNAL
TN6 UNAL
TN7 UNAL
TN8 UNAL
TN9 UNAL
TN 10 UNAL
TN 11 UNAL
TN 12 UNAL
SECT UNAL
TOWN UNAL
RANG UNAL
NATI UNAL
CONT UNAL
MSS UNAL
MFSS UNAL
MCSS UNAL
SLAB UNAL
CLAB UNAL
CS 1 UNAL
CS 2 UNAL
C S 3 UNAL
BS 1 UNAL
BS 2 UNAL
BS 3 UNAL
HLD UNAL
RUN UNAL
LUN UNAL
OPER UNAL
LCC UNAL
BLI UNAL
TLI UNAL
EPD UNAL
APD UNAL
F F
F F
F F
F F
USA
NAM
STATE
COUNTY
13.375
9.625
12.25
8.50
INCL
0.000
2300.000
0.000
0.000
0.000
0.000
0.000
0.000
EKB UNAL F F 78.710
EDF UNAL F F 77.210
EGL UNAL F F 0.000
TDD UNAL F F 13430. 000
TDL UNAL F F 13430. 000
CW1 UNAL LB/F LB/F 0. 000
BSD1 UNAL F F 0. 000
CBD1 UNAL F F 0 . 000
CBL1 UNAL F F 0.000
CW2 UNAL LB/F LB/F 0. 000
BSD2 UNAL F F 0. 000
CBD2 UNAL F F 0.000
CBL2 UNAL F F 0.000
CW3 UNAL LB/F LB/F 0. 000
BSD3 UNAL F F 0. 000
CBD3 UNAL F F 0. 000
CBL3 UNAL F F 0.000
STEM UNAL DEGF DEGF 0.000
MRT UNAL DEGF DEGF 0.000
DFD UNAL LB/G LB/G 0. 000
DFV UNAL S S 0.000
DFPH UNAL 0.000
DFL UNAL C3 C3 0.000
RMFS UNAL OHMM OHMM 0.000
RMS UNAL OHMM OHMM 0.000
RMCS UNAL OHMM OHMM 0.000
MST UNAL DEGF DEGF 0.000
MFST UNAL DEGF DEGF 0.000
MCST UNAL DEGF DEGF 0.000
** information records **
table type
MNEM
: PRES
OUTP STAT TRAC CODI DEST MODE
GR GR ALLO Ti MSPO
ROP ROP ALLO T2 MLIN
SWOB SWPB ALLO T3 MDAS
DRHO DRHO DISA T3 LSPO
PHIN PHIN DISA T23 LDAS
PEF PEF DISA T23 HGAP
BS BS DISA T1 LSPO
TENS TENS DISA T2 LSPO
1
1
1
1
1
1
1
1
NB
NB
NB
NB
SHIF
SHIF
NB
NB
FFLS FFLS DISA Ti LLIN 2 NB
FFSS FFSS DISA Ti HGAP 2 NB
FLS FLS DISA T1 LSPO 2 NB
FSS FSS DISA T1 HDAS 2 NB
LSHV LSHV DISA T23 LLIN 2 SHIF
SSHV SSHV DISA T23 LDAS 2 SHIF
14 DUMM DISA T1 LLIN NEIT NB
15 DUMM DISA T1 LLIN NEIT NB
16 DUMM DISA T1 LLIN NEIT NB
17 DUMM DISA T1 LLIN NEIT NB
18 DUMM DISA T1 LLIN NEIT NB
19 DUMM DISA T1 LLIN NEIT NB
** information records **
table type :FILM
MNEM
GCOD GDEC DEST DSCA
1 EEE
2 EEE
PF1 S2
PF2 D500
** information records **
table type :AREA
MNEM STAT BEGI
1 DISA
2 DISA
3 DISA
4 DISA
5 DISA
6 DISA
7 DISA
8 DISA
** data-format record **
entry blocks
type
4
8
9
size
1
4
4
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
END PATT DEST
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
Z1 BLAN NEIT
repr code
66
68
65
entry
255
60.000
.liN
12 4 68 -9999.000
0 2 79 0
datum specification blocks
WARNING the following table is in LIS Datum Specification Block
Sub-Type 0 and the API Type Codes may be Unreliable!!!
mnem service service
id order #
DEPT
GR
ROP
SWOB
RPM
TCDS
INC
AZM
TVD
VS
NS
EW
DLS
unit api api
log type
FT 00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
00 000
api api file size spl repr
class mod no. code
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
00 00 0 4 1 68 0
process
level
depth = 10200.0000 feet
GR 1.0000 ROP
TCDS 1.0000 INC
VS 1.0000 NS
depth = 10350.0000 feet
GR 109.0000 ROP
TCDS 132.8000 INC
VS -9999.0000 NS
depth = 10500.0000 feet
GR 158.2500 ROP
TCDS 140.2570 INC
VS -9999.0000 NS
depth = 10650.0000 feet
GR 135.0000 ROP
TCDS 122.0000 INC
VS -9999.0000 NS
3108.9600 meters
1.0000 SWOB 1.0000 RPM
1.0000 AZM 1.0000 TVD
1.0000 EW 1.0000 DLS
3154.6800 meters
57.0670 SWOB 61.4730 RPM
-9999.0000 AZM -9999.0000 TVD
-9999.0000 EW -9999.0000 DLS
3200.4000 meters
76.8760 SWOB 44.9080 RPM
-9999.0000 AZM -9999.0000 TVD
-9999.0000 EW -9999.0000 DLS
3246.1200 meters
35.3760 SWOB 27.2620 RPM
-9999.0000 AZM -9999.0000 TVD
-9999.0000 EW -9999.0000 DLS
1.0000
1.0000
1.0000
46.0000
-9999.0000
-9999.0000
99.1650
-9999.0000
-9999.0000
0.0000
-9999.0000
-9999.0000
depth = 10800.0000 feet 3291.8400 meters
GR 133.0000 ROP 19.2830 SWOB 30.6790 RPM 0.0000
TCDS 125.6000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 10950.0000 feet 3337.5600 meters
GR 133.0000 ROP 29.3790 SWOB 65.7740 RPM 70.0000
TCDS 147.2000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11100.0000 feet 3383.2800 meters
GR 244.0000 ROP 25.9000 SWOB 44.0410 RPM 0.0000
TCDS 143.6000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11250.0000 feet 3429.0000 meters
GR 454.0000 ROP 31.5220 SWOB 29.2480 RPM 0.0000
TCDS 110.3000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11400.0000 feet 3474.7200 meters
GR 53.5000 ROP 77.9280 SWOB 65.4950 RPM 70.0000
TCDS 158.3600 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11550.0000 feet 3520.4400 meters
GR 63.0000 ROP 76.8160 SWOB 57.0550 RPM 87.0000
TCDS 168.8000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11700.0000 feet 3566.1600 meters
GR 56.0000 ROP 25.6940 SWOB 16.1360 RPM 116.0000
TCDS 172.4000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 11850.0000 feet 3611.8800 meters
GR 70.0000 ROP 60.8560 SWOB 24.1200 RPM 127.0000
TCDS 170.1500 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12000.0000 feet 3657.6000 meters
GR 60.5000 ROP 65.3930 SWOB 23.4650 RPM 115.0000
TCDS 172.4000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12150.0000 feet 3703.3200 meters
GR 62.2500 ROP 68.6630 SWOB 33.6110 RPM 109.0000
TCDS 175.6400 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12300.0000 feet 3749.0400 meters
GR 101.8000 ROP 155.8050 SWOB 72.1340 RPM 97.0000
TCDS 203.2250 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12450.0000 feet 3794.7600 meters
GR 70.0000 ROP 49.0150 SWOB 16.7620 RPM 124.0000
TCDS 181.4000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12600.0000 feet 3840.4800 meters
GR 127.0000 ROP 68.5190 SWOB 20.1190 RPM 138.0000
TCDS 187.5200 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12750.0000 feet 3886.2000 meters
GR 57.0000 ROP 40.0590 SWOB 20.5540 RPM 135.0000
TCDS 188.6000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 12900.0000 feet 3931.9200 meters
GR 62.0000 ROP 38.5410 SWOB 28.4820 RPM 145.0000
TCDS 193.1000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 13050.0000 feet 3977.6400 meters
GR 51.5000 ROP 196.8510 SWOB 58.2320 RPM 122.0000
TCDS 193.7750 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 13200.0000 feet 4023.3600 meters
GR 48.5000 ROP 50.7190 SWOB 25.9790 RPM 31.0000
TCDS 192.8000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
depth = 13350.0000 feet 4069.0800 meters
GR 162.0000 ROP 84.5440 SWOB 54.5580 RPM 99.0000
TCDS -9999.0000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000
VS -9999.0000 NS -9999.0000 EW -9999.0000 DLS -9999.0000
** file trailer **
file name :665 .001
service name : DG
version # : 1.23
date :88/12/05
maximum length : 1024
file type : LO
next file name :